REPORT 
Item No: 14 
SUBJECT: Risk Management Report
TO: Integration Joint Board Committee
Lead
Officer for
Report:
Ross McGuffie, NL HSCP Chief Officer
Author(s) of
Report
Stacey Anderson, Support Services Project Manager
DATE: 25th September 2024 
1. PURPOSE OF REPORT 
This paper is coming to the IJB for: 
For approval ☒ For endorsement ☐ To note ☐ 
The purpose of this report is to provide a summary to the IJB on risk management
activity, noting any amendments or additions to the current risk register. 
2. ROUTE TO THE BOARD 
This paper has been: 
Prepared By: ☒ Reviewed By: ☐ Endorsed By: ☐ 
By: The Support Services, Project Manager and Chief Officer North HSCP. 
1

Page 2

3. RECOMMENDATIONS 
3.1 The IJB is asked to note the contents of the presentation which includes a review of
the highest rated risks within the IJB risk register and a note of those operational
risks highlighted by the Heath & Social Care North Lanarkshire partnership that
impact upon delivery of IJB business. 
3.2 The IJB is asked to note the addition of a risk relating to the Speech and Language
Therapy Service to the IJB Risk Register following recent performance reports and
as agreed at the IJB PFA on the 21st August 2024. 
4. VARIATIONS TO DIRECTIONS? 
Yes ☐ No ☒ N/A ☐ 
5. BACKGROUND/SUMMARY OF KEY ISSUES 
5.1 From a good practice and sound governance perspective, all public bodies are
required to identify and take account of the impact of any potential risks in delivering
their business. 
5.2 The PFA Committee has delegated oversight and responsibility for financial and
performance risks associated with the remit of the Integration Joint Board. 
5.3 At the IJB PFA meeting on 21st August 2024, the following risk changes were
approved:
 Introduction of a risk relating to the performance of speech and language
therapy service following on from recent performance reporting that has
been presented to the IJB. 
5.4 There are currently two other risks rated as Very High on the IJB risk register.
 IJB 06/21 – Prescribing Activity and Costs
 IJB 01/21 – Financial Challenges 
5.5 There following risks are rated high on the IJB risk register. 
 IJB 04/21 - Notional Set Aside Budget
 IJB 12/21 - Staff Health & wellbeing
 IJB 15/22 – Cost of Living
 IJB 16/22 – National Care Service
 IJB 19/23 – Service Sustainability
 IJB 20/23 – Workforce Sustainability
 IJB 12/22 – Unscheduled Care
 IJB 23/24- Speech and Language Therapy

Page 3

5.6 There are several High/Very High rated operational risks that have been identified
as having or potentially having an impact on IJB objectives and/or delivery of
services and these are highlighted within the Risk Overview Dashboard that has
been presented to IJB PFA (Appendix 1) and Risk Register (Appendix 2). 
6. CONCLUSIONS 
6.1 The IJB currently has 19 risks identified on its IJB risk register with 11 risks rated as
high or very high. 
6.2 Risks identified by H&SC NL as potentially impacting on IJB business are
highlighted in the report. 
6.3 The inclusion of the Speech and Language Therapy Service Risk to the IJB risk
register as per approval at the recent IJB PFA meeting. 
7. IMPLICATIONS 
7.1 NATIONAL OUTCOMES
Link(s) to National Health and Wellbeing Outcomes 
People are able to look after and improve their own health and wellbeing
and live in good health for longer
☐
People, including those with disabilities or long-term conditions, or who are
frail, are able to live, as far as reasonable practicable, independently and at
home or in a homely setting in their community
☐
People who use Health and Social Care Services have positive
experiences of those services, and have dignity respected
☐
Health and Social Care Services are centered on helping to maintain
or improve the quality of life of people who use those services
☐
Health and Social Care Services contribute to reducing health inequalities ☐ 
People who use Health and Social Care Services are safe from harm ☐
People who work in Health and Social Care Services feel engaged with the
work they do and are supported to continuously improve the information,
support, care and treatment they provide
☐
Resources are used effectively and efficiently in the provision of Health and
Social Care Services
☒
7.1 ASSOCIATED MEASURE(S) 
7.2 FINANCIAL 
4

Page 4

This paper has been reviewed by Finance: 
Yes ☐ No ☒ N/A ☐ 
7.3 RISK ASSESSMENT/RISK MANAGEMENT 
Relevant Risk Register
Details
Current Risk Level Risk Owner
IJB Risk Register Choose an item. Multi 
7.4 ENGAGEMENT & PARTICPATION
Please tick the engagement and participation objectives that link(s) with this piece of
work and provide further details regarding the engagement and participation that was
undertaken. 
Objectives Further Details
Involve stakeholders in the development
work aimed at achieving the national
outcomes 
1. Provide stakeholders with information on
how to get involved 
Ensure a diverse range of engagement
and participation and opportunities are in
place to suit different needs 
1. Measure how well we involve community
stakeholders in the planning, design
and delivery of our services 
Provide regular feedback on how
stakeholder engagement and participation is
shaping and influencing service
development and delivery 
Provide support to enable stakeholder
representatives to participate meaningfully
and confidently at meetings 
Develop participation guidelines to
ensure a common understanding and set of
expectations for both stakeholders and
partnership staff 
Support engagement planning and
participation in localities, taking account of
other engagement activity and local plans
across the Community Planning
Partnership 
5

Page 5

7.5 INEQUALITIES & FAIRER SCOTLAND DUTY 
EQIA Completed & Fairer Scotland Impact Assessment Form Completed and
attached to report: 
Yes ☐ No ☒ N/A ☐ 
EQIA added to website: 
Yes /
Date
added
☐ No ☐ N/A ☒ 
8. BACKGROUND PAPERS
None.
9. APPENDICES
Appendix 1 – Risk Overview Dashboard
Appendix 2 – IJB Risk Register 
CHIEF ACCOUNTABLE OFFICER (or Depute) 
Members seeking further information about any aspect of this report, please contact
the following; Stacey Anderson Stacey.Anderson3@lanarkshire.scot.nhs.uk 
6

Page 6

Direction from North Lanarkshire Integration Joint Board (IJB) 
1 Reference Number 
2 Report Title 
3 Date direction issued by IJB 
4 Date from which direction
takes effect 
5 Direction to: 
6 Does this direction
supersede, revise or revoke a
previous direction – if yes,
include reference number(s) 
7 Functions covered by
direction 
8 Full text of direction 
9 Budget allocated by
Integration Joint Board to
carry out direction 
10 Performance Management /
Governance
arrangements 
11 Date direction will be
reviewed 
7

Page 7

Appendix 1 
15 
Report Prepared by Stacey Anderson on behalf of the Chief Officer

Page 8

16 
Report Prepared by Stacey Anderson on behalf of the Chief Officer

Page 9

17 
Report Prepared by Stacey Anderson on behalf of the Chief Officer

Page 10

18 
Report Prepared by Stacey Anderson on behalf of the Chief Officer

Page 11

Appendix 2 IJB Risk Register 
IJB ID  Category   
Open
ed  Description of Risk  
Risk
level   Mitigating  Controls 
Risk
level 
Risk
level 
Ris
k  Risk
Regist
er 
Assuran
ce  Next
Revie
w    Clos
ed   
IJB.01/ 21  Financi
al
Strategi
c
01/04/2021
Financial  Challenges
There are a range of financial challenges which will impact on the
IJB's ability to deliver the Strategic Commissioning Plan
intentions within the financial envelope available. These include: 
1. The absence of a unique IJB financial settlement from the
Scottish Government.
2. The IJB is dependent on funding from both partners.
3. Late Scottish Government financial settlement.
4. Budget reductions due to insufficient Scottish Government
financial settlements and/or partner contributions.
5. New Scottish Government policy commitments e.g. Carers
(Scotland) Act 2016.
6. Demographic  growth.
7. Competing service priorities.
8. Conflicting partner efficiency savings programs which
adversely impact on the HSCP's ability to deliver services.
9. In‐year cost pressures emerging due to the underachievement
of planned savings, pandemics and other emerging risks which
may lead to an overspend.
10. Each partner may be unable to maintain their financial
contributions to the IJB in future years which would impact on
frontline health and social care services.
11. The agreed transformational plans and service redesigns
are not implemented in full and in line with the original
implementation plan and/or do not secure the intended
improvement outcomes in both performance standards and
financial efficiency targets.
12. Future savings targets will continue to be challenging and are
likely to impact on essential core services.
13. The IJB Financial Plan cannot be adhered to and budget
recovery plans fail to achieve financial balance for both
partners. 
14. The continuing recovery from the pandemic on the financial
sustainability of external providers in particular social care
providers.
15. The financial implications of the continuing impact of the
pandemic on the workforce e.g. increase in sickness absence,
early retirement requests and recruitment challenges. 
The above factors would lead to a failure to achieve the desired
strategic aims and would also impact on service delivery.   
HIGH
CONTROLS 
1. IJB PFA Committee. 
2. IJB Chief Officer is a member of each partner's key decision‐making forums.
3. Effective joint working between North and South Chief Financial Officer and both
Council and NHS Finance Departments.
4. Regular budget meetings with Chief Executives and Directors of Finance.
5. Regular HSCP budget monitoring meetings across Senior Leadership Team. 
6. The IJB Financial Plans have been agreed and are reviewed regularly.
7. IJB medium term financial plan 2023 ‐26 and reserves strategy 2023‐24 approved
at March 23 IJB
8. Capacity plans in place to maximise efficiency.
9. IJB Integration Scheme setting out the budget recovery processes. 
10. IJB Financial Regulations and financial procedures. 
11. Consultation and involvement with key stakeholders including service users and
carers. 
12. Prescribing Quality and Efficiency Programme, SWEG, ARG and Home Support
monitoring groups are in place. 
13. Joint Strategic Needs Assessment and ongoing move towards preventative and
anticipatory approaches. 
13. Strategic Planning Group, Locality engagement sessions and Partnership Boards.
14. Effective and ongoing service user engagement, staff consultation and Trade
Union liaison at strategic and local levels. 
ACTIONS 
1. Annual budget setting processes within each of the partners.
2. HSCP participating in NHSL Sustainability and Value process 
3. Partnership will also be connected to new national whole system groups around
budget  
VERY HIGH   
Medium 
Amanda Kilburn   
Amanda Kilburn  
SLT, IJB
PFA, IJB   
28.06.2024 
Previously IJB2, IJB7, IJB10 and
IJB12. 
Reviewed and Updated May
2023. Reviewed and Updated
Sept 2023. 
Reviewed and updated Jan 2024. 
Reviewed and updated March
2024. 
Review and risk increased June
2024. 
Reviewed and no changes Sept
2024 
IJB02. 21  Financial
Reputationa
l
01/04/2021
Prevention and Detection of Fraud, Bribery and/or
Corruption There is a risk that the IJB is unable to prevent
and detect fraud and corruption within services because of
inadequate governance
arrangements and inadequate internal control systems which
could lead to financial and reputational damage.   
LOW
CONTROLS 
1. Fraud awareness e‐learning. 
2. National Fraud initiative.
3. Locality/SW Enablement Groups.
4. Segregation of duties in relation to authorising and processing direct payments. 5
Whistle blowing policies.
6. Procurement processes and standing orders.
7. Oversight via NLC Audit and Scrutiny Panel and NHSL Audit Committee.
8. Effective governance arrangements are in place and subject to internal and
external audit review.
9. IJB and IJB PFA meetings established ensuring effective oversight of financial
performance.
10. The IJB does not maintain its own policies relating to the prevention and detection of
fraud and error but instead depends on those in place at its partnerbodies. The IJB has a
Code of Conduct in place to which members subscribe and the Members’ Registers of
Interests are publicly available on the IJB’s website  
LOW
LOW
Ross McGuffie   
Amanda Kilburn  
SLT, IJB
PFA, IJB   
31.08.24 
Previously IJB6. Reviewed
and updated on March
2023. 
Reviewed and Updated Oct
2023, (previously title
ineffective governance 
arrangements). 
Reviewed May 2024
Reviewed and No changes Sept
2024

Page 12

ACTIONS
1. Continue to raise fraud awareness through teambriefings.
2. Annual planned Procurement and Standing Financial Instructions presentations.
3. Annual review of Code of Conduct
4. Review of how Members' Declaration of Interests are collated and reviewed.
5. IJB to request Fraud prevention and detection reports from both partners for oversight
at the IJB PFA.         
IJB04. 21  Financi
al
Strategi
c
01/04/2021
Notional Set‐Aside Budget 
There is a risk that resources will not be transferred from Acute
Services to the HSCP in line with the shift in the balance of care
from residential and acute settings to community based
alternatives as expected in terms of the notional set‐aside concept.
This includes the ongoing
development of locality pathways to support maintaining
people at home e.g. transitional care models.   
VERY HIGH
CONTROLS 
2. There is complete transparency and ongoing dialogue between the IJB and the Health
Board on the challenges associated with the implementation of the notional set‐aside
concept. 
3. Bed modelling and capacity planning arrangements are in place.
4. Effective working relationships between both partners and the IJB have been
established.
5. Since the inception of the IJB, an agreement is in place whereby the NHSL Health
Board will manage the overspend or underspend across the notional set ‐aside budget.
This arrangement continues to be in place for 2022/23 
ACTIONS
1. The Chief Officer and the Chief Financial Officer continue to raise this concern at a
national level. 
HIGH   
MEDIUM 
Ross McGuffie   
Amanda Kilburn  
SLT, IJB
PFA, IJB   
28.08.2024   
Reviewed and Updated May 2023. 
Reviewed Oct 2023. 
Reviewed Jan 2024 
Reviewed May 2024 
Reviewed July 2024.
Reviewed Sept 2024 
IJB05. 21  Financi
al
Strategi
c
01/04/2021
Hosted Services 
There is a risk of dispute between the North Lanarkshire IJB and
the South Lanarkshire IJB in respect of the financial allocations
underpinning the Hosted Services particularly as a result of the
budget changes linked to the implementation of devolved locality
models. This could impact on the ability of each IJB to achieve its
commissioning intentions and may also have an adverse impact
on service users across Lanarkshire.   
VERY HIGH
CONTROLS 
1. North and South IJBs aim to co ‐operate to ensure a pan‐Lanarkshire approach is
achieved across all hosted services. 
2. Financial and budgetary controls.
3. Performance reports on service delivery. 
4. The Hosted Services principles in respect of the management of the
overspends and underspends are agreed for each financial year. 
CONTROLS 
1.. Prescribing Quality and Efficiency Programme. 
2. Prescribing Management Board functions and membership. 
3. Deputy Lead Pharmacist supporting HSCP Senior Leadership Team.
4. Locality Pharmacist input.
5. Earmarked reserve established to address prescribing costs.
6. Regular HSCP monitoring.In respect of the regulation of medicines and medical
devices, the Medicines and Healthcare products Regulatory Agency (MHRA) became
the UK’s sovereign regulator. 
7. The new trade deal contains specific clauses that mean both the UK and EEA states
formally recognise each other’s good practice in medicine manufacturing.
8. To reduce the risk of divergence from the EU rules, there are three interrelated
factors; the technical annexes of the new trade deal, the Northern Ireland protocol
and the UK Internal Market Act.
9. The effectiveness of the Border Operating Model to import and export goods to and
from the EEA, which was being implemented in stages from 2020 to minimise any risk of
disruption, is still being assessed. The risk of border delays is still evident. Other
measures were also implemented specifically to mitigate the risk of supplies of medicines
and medical devices being disrupted. In August 2020 the UK government instructed
medicine suppliers to maintain a stockpile equivalent to six weeks’ supply though the first
three months of 2021. In addition, the Department of 
MEDIUM 
MEDIUM 
Ross McGuffie 
Amanda Kilburn 
SLT, IJB
PFA, IJB 
28.08.2024  
Reviewed Jan 2024 
Reviewed May 2024 
Reviewed July 2024. 
Reviewed Sept 2024     
Prescribing Activity and Costs 
The cost of prescribing is growing due to issues in supply chains
driving increased wholesaler cost of medicines, advance
treatment developments resulting in the need for more expensive
medications, aging population and increase in patients requiring
regular medication.
Medication availability has been impacted following the EU
withdrawal the UK 's membership of the common regulatory
bodies and EU agencies, such as the European Medicines
Agency, (EMA), European Centre for Disease Prevention and
Control and the European Atomic Energy Community. The risk is
that this could impact on the availability of medicines, healthcare
techniques and technology and in respect of the supply of
medicines and medical devices, additional checks are now
required at ports in the UK and the EEA before goods, including             
IJB06. 21  Financial
Operationa
l
01/04/2021   
Medium  
VERY HIGH   
LOW
Ross McGuffie   
Amanda Kilburn  
SLT, IJB
PFA, IJB   
28.08.24  
Previously IJB11. Reviewed
and updated June 2023. 
Reviewed and Updated
(risk increased) October
2023. 
Reviewed Jan 2024 
Reviewed June 2024. 
Reviewed July 2024. 
Reviewed Sept 2024

Page 13

moving medicines between the EEA and the UK.  Transport has secured additional freight capacity to bring medicines into the country via
other
routes. 
ACTIONS
1. Review of Locality Prescribing Action Groups.
2. Prescribing part of NHSL Sustainability and Value structures
3. Continuation of Scriptswitch.
4. Prescribing updates being provided to IJB as per financial reports         
IJB07. 21  Financi
al
Strategi
c
01/04/2021
Third and Voluntary Sector 
There is a risk that Third Sector organisations in North
Lanarkshire are vulnerable because of the lack of certainty in
respect of long‐term funding security. This uncertainty has the
potential to lead to service instability, recruitment and retention
challenges and an increasing reliance on statutory services.   
HIGH
CONTROLS 
1. Third Sector Interface represented on key strategic groups. 
2. Community capacity building and carer support infrastructure embedded across
North Lanarkshire.
3. Community capacity building is regularly reviewed. 
4. Maximising funding opportunities for the third and voluntary sector will continue
to be progressed. 
ACTIONS
1. The annual HSCP funding which is directed to the third sector is recurring funding.
Funding will be confirmed each year in line with the agreement of the IJB Financial Plan
and subject to the Scottish Government financial settlements for future years.
2. Updated SLA with VANL nearing completion  
LOW
LOW
Ross McGuffie   
Amanda Kilburn  
SLT, IJB
PFA, IJB   
30.06.24  
Previously IJB16. 
Reviewed April 2024. 
Reviewed July 2024 
Reviewed and no changes Sept
2024 
IJB.10. 21  Financi
al
Strategi
c
01/04/2021
Ineffective  Governance  Arrangements
1. There is a risk that the intensity of the required response to
Covid ‐19
may have resulted in a failure of governance impacting on the
effectiveness of the IJB decision‐making, IJB directions to
partners and IJB oversight of operational service delivery.
Routine governance
2. New or amended legislation and Scottish and UK Government
guidance may not be adopted effectively and timeously.
3. There is no / limited public access to IJB and PFA meetings
during the period of the pandemic, in line with Public Health
advice. 
4. Ineffective information governance controls could lead to
data breaches and an impact on the General Data Protection
Regulations. 
5. Communications with employees, patients and service users
may be ineffective. 
6. There will require to be changes to the working
environment including remote working and working from
home. 
7. There is a reduced ability to protect the wellbeing of
employees, patients and service users.
8. There may be adverse media coverage locally, a loss of
public confidence and reputational damage.   
MEDIUM
CONTROLS 
1.N  ational Networks are established which are providing the framework to support a
national approach where appropriate. 
2 .Public Health advice and support is in place. 
3 .Increased numbers of agile workers and increased number of laptops/tablets.
4 .Continued working from home arrangements supported by the roll out of MS Teams /
Zooms. Regular updates on the guidance for the use of MS Teams / Zoom Meetings is
circulated. A blended approach to home/work ‐based working is being developed going
forward.
5.R  isk registers are in place for the IJB and each partner. Each partner has a
specific HSCP Covid‐19 Risk Register in place.
6 .The IJB and both partners aim to comply with the European Working Time Directive
(WTD) and minimise the risk of all staff working beyond 48 hours per week, in particular
front ‐line service delivery. As a result of the withdrawal from the European Union, the
WTD ceased to apply to the United Kingdom at the end of the transition period (31
December 2020). However, the UK's Working Time Regulations which implement the EU
Working Time Directive will continue to apply unless and until amended by UK law.
7 .Back to Basics exercise has helped to focus on the underpinning governance
requirements
across the whole HSCP
8. Staff health and wellbeing is a key priority for both partners and all key stakeholders.
The commitment to staff health and wellbeing is being actively promoted through all
available forums. 
9. IJB Governance reporting reviewed and associated documents updated.  
LOW
LOW
Ross McGuffie   
Amanda Kilburn  
SLT, IJB
PFA, IJB   
30.10.24  
Reviewed and updated June
2023. 
Reviewed and updated Oct
2023. 
Reviewed and updated Jan
2024. 
Reviewed and Risk level
lowered June 2024. 
Reviewed and no changes Sept
2024 
IJB.11 21  Performanc
e
30/07/2021
Oversight of Performance Activity 
There is a risk that the IJB is not provided with adequate or
sufficient performance information to enable it to discharge its
scrutiny and oversight role; make informed decisions and
recommend remedial actions to address any performance
concerns.   
LOW
CONTROLS 
Regular (quarterly) reports on the IJB performance framework, providing updates on
areas for improvement, remedial actions (and timescales) and updates on performance
issues previously reported. 
Chief  Executive  Performance  Review  arrangements.  Hosted  Services 
Performance  Review arrangements. Sector/Locality Performance Review arrangements.  
LOW
LOW
Ross McGuffie   
Morag Dendy  
SLT, IJB
PFA, IJB   
31..10.24 
Reviewed May 2024. 
Reviewed June 2024. 
Reviewed and no changes Sept
2024   
Staff Health & Wellbeing  CONTROLS        Reviewed and Updated May

Page 14

IJB.12. 21  Performanc
e
30/08/2021 
There is a risk to the delivery of the Strategic Commissioning
Plan as a result of sustained pressures on staff availability due to
additional pressures associated with Covid 19, current sickness
absence levels and potential for further staff redeployment due to
winter planning contingency  arrangements.   
MEDIUM 
Strategic Staff Health & Wellbeing Committee established reporting to NLC & NHSL
corporate management  teams. 
Range of support services available both nationally and locally e.g Occupational Health,
Spiritual care, Psychological Services, national wellbeing hub (www.PRoMIS.scot.uk).
Rest & Recuperation areas
identified. Peer Support Networks
established
Well established Occupational Health supports available to support staff sickness. 
ACTIONS
Short Life Working Group for wellbeing with targeted approach for immediate actions
including Staff Health & Wellbeing Champions, access to online supports, access to
Occupational Health Services, helpline established and dedicated resource identified for
wellbeing officers to be recruited.
Funding received by Scottish Government specifically targeting staff wellbeing
programmes and supports. Local plans for use of funding being developed.
Managers supporting & encouraging staff to take planned leave/use full leave allocation  
HIGH   
low 
Ross McGuffie   
Ross McGuffie  
SLT, IJB
PFA, IJB, SC&CG, AH&SC   
28.08.24   
Reviewed and updated Dec 2023. 
Reviewed May 2024. 
Reviewed Sept 2024 
IJB.1
3.
2021 
Performanc
e
30.08.21
Care Homes 
Inability of care homes to sustain service due to staffing and cost
pressures resulting in closure to new placement and closure of
care homes. This may increase delayed discharge numbers
putting additional pressure on acute site capacity and impacting
on recovery.   
HIGH
CONTROLS 
Establishment of Care Home Assurance Team. 
Escalation Process in place.
National protocol to support discharge of Covid 19 patients in place. 
ACTIONS
Public Health teams providing guidance on infection control.
Care Home assurance team undertaking support visits to all care homes & action plans in
place for each care home.
All care homes advised to use PPE in line with national addendum.
Development day on 12th May 23 to agree structures and approach for year ahead  
medium   
medium 
Ross McGuffie   
Sharon Murphy  
IJB, PF&A, SLT, SC&SC, A
H
&SC   
28.08.24   
Reviewed and updated Oct 2023 
Reviewed May
2024. . Reviewed
Sept 2024 
IJB.1
4.
2022 
Strategic &
Performanc
e
30.04.22
CAMHS 
There is a risk that the CAMHS service cannot meet the increasing
clinical demands due to a significantly high number of cumulative
staff vacancies for both clinical and non ‐clinical posts and
challenges recruiting to new posts identified through the national
recovery and renewal fund. This is impacting on community, in‐
patient and out‐ patient care with the potential to adversely affect
response time to referrals; longer waiting times; poorer outcomes;
delays in redesign and reputation of the IJB.   
VERY HIGH
CONTROLS 
Prioritisation of referrals; all referrals vetted daily with urgent referrals prioritised
Commenced programme of work and implementation of a more structured partnership
approach through Choices & Partnership Approach (CAPA) service model, with tier 1 & 2
referred through 3rd sector and interfacing with North & South Education Departments
Secured significant national investment to fully implement new service model
Active review of skill mix to utilise medical staff only when required for highly complex
patients
Vacancy gap analysis with active recruitment commenced. Expected to have recruited
75% of gap by end of May 2023
Continuous review and validation of the waiting list
Waiting list validation exercise completed in April 2022 with reduction in list by 16% 
CAPA appointments begin on 1st May 2023 ‐ first cycle (16wks) nearing
completion Monthly monitoring at board
Incremental implementation of the new service
model Performance monitoring through the
programme board
CAHMS IT Board in train to plan and oversee implementation of SCI gateway for
referrals Waiting list initiative commenced
Udston opened for patients September 2022
Upgrade to North physical infrastructure agreed.
Close working with health improvement and GP
reps  
Medium   
Medium 
Ross McGuffie   
Morag Dendy  
IJB,PF&A, SLT   
28.02.2024 
Reviewed and Updated May
2023. 
Reviewed and updated Dec
2023. 
Reviewed and risk level lowered
May 2024. 
Reviewed and no changes Sept
2024   
Cost of Living  CONTROLS

Page 15

IJB.1
5.
2022 
Strategic &
Performanc
e
05.09.22 
There is a risk that the IJB's Strategic Commissioning Plan will be
unable to be delivered or not have the desired impact due to the
cost of living rises being faced by residents across North
Lanarkshire, leading to a further widening of the inequality gap,
reduced quality of life and increased health and social care
demand due to individuals and families having insufficient funds to
support basic requirements such as food and heating.   
HIGH 
NLC Silver command group stood up focused on cost of living 
NHSL commenced review through CMT
Population Health Committee to review activity around cost of
living NLC approved cost of living contract increases in May
2023 
ACTIONS
Survey of NLC hybrid workers to see if home working remains financially viable
Business case being developed to expand 'support for people' arrangements used in
pandemic to support resident access to welfare rights and other supports
3% increase in individual budgets to support service users to maintain current levels of
supports at higher cost 
Recommendation from adult social work, care and wellbeing committee to review all
charges to service users and wider cost.  
High   
Medium 
Ross McGuffie   
Ross McGuffie  
SLT, IJB   
30.08.2024 
Reviewed and Updated May 2023. 
Reviewed Oct 2023. 
Reviewed May 2024. 
Reviewed Sept 2024 
IJB.1
6.
2022 
Strategic    
05.09.22
National Care Service 
There is a risk that the ongoing work around a National Care
Service could destabilise current service delivery due to
significant change activity, time demands around the co‐design
process, staff uncertainty and partner organisations having to
focus inwardly due to the impact of change leading to an impact
on the ability to deliver the significant ongoing change
programmes already approved by the IJB and the Strategic
Commissioning Plan for 2023‐26.   
HIGH
CONTROLS
NLC establishing NCS working groups
Key HSCP leads involved in national
developments Ongoing progress updates to
IJB and IJB PFA 
ACTIONS
IJB response submitted on proposed Bill
Strong partnership links into working groups at Chief Officers, Chief Finance Officers
and Social Work Scotland groups           
High   
Low 
Diane Fraser   
Ross McGuffie  
SLT, IJB
PFA, IJB, 
31.08.24 
Reviewed and Updated May
2023. Reviewed and Updated
Oct 2023. 
Reviewed and Updated May
2024 Reviewed Sept 2024 
IJB.1
7.
2022 
Strategic &
Performanc
e
05.09.22
Unscheduled Care 
There is a risk that we cannot sustain whole system patient flow
through peak winter pressures due to increased front door
demand; hospital workforce capacity; delays in onward movement
of patients due to care home capacity/outbreaks and care at home
capacity; and community health and social care workforce
capacity leading to reduced ability to meet 'routine' and increasing
bed demand for more unwell patients, deteriorating delayed
discharge performance and an inability to recover services.   
Very High
CONTROLS 
Care Home Assurance Group and associated supports for care homes through liaison
service, IPC advice and support, risk assessment for onward movement of patients etc.
Care at Home Assurance group and associated activity to try to support and sustain
independent sector provision
NHS CMT and Covid response group oversight of performance
Daily PDD meetings to review every planned supported discharge and delayed discharge 
Operation Flow now underway to ensure whole system approach to unscheduled
care/delayed discharge  challenges 
Expansion of Home Support service
Roll out of Home Assessment Teams across all 6 Localities
New CSW roles in District Nursing teams to proactively support Care Managed
patients Additional Nursing capacity in District Nursing Teams
Expansion of Equipment and Adaptation Service to support rapid access in community
Expansion of H@H service (hours of provision as well as moving to support discharges
as well as admission  prevention)
Expansion of Integrated Rehabilitation Teams in all six Localities to support
rehab in the community and reduce long‐term service demand
Regular Firebreaks across the system
Task and Finish groups now established to roll out the key actions agreed through the
Operation Flow programme (Phase 2 to be completed by Sept 23)  
High   
Medium 
Ross McGuffie   
Ross McGuffie  
SLT, IJB
PFA, IJB   
28.08.24  
Reviewed and Updated in June
2023. 
Reviewed Oct 2023 
Reviewed Jan 2024. 
Reviewed and risk level reduced
May 2024. 
Reviewed Sept 2024 
IJB.1
8.
2022 
Strategic
and
Performanc
e
05.09.22
Community  Alarms 
There is a risk that the community alarm system will be
destabilised due to the national change from analogue to digital
telephony by 2025, leading to community alarm users not getting a
response when required.   
HIGH
CONTROLS 
Working group established to coordinate all
activity Oversight through Home Support
Programme Board
Reporting to Adult Social Work, Care and Wellbeing Committee
Reporting to IJB 
ACTIONS
NLC Committee approval to purchase 1000 digital alarms so the service can support any
imminent changes over to digital in individual areas
NLC part of SG once for Scotland procurement process for a new digital alarm receiving 
Medium   
Low 
Diane Fraser   
Ross McGuffie  
SLT, IJB
PFA, IJB, 
28.07.2024  
Reviewed and updated June
2023. 
Reviewed Oct 2023. 
Reviewed Jan 2024.
Reviewed April 2024.
Reviewed Sept 2024

Page 16

Communication out to all community alarm service users
Instructions issued to all community alarm service users on how to do test calls to
ensure alarms are operational
Engagement with telecommunication suppliers to ensure sight of roll out plans across NL         
IJB.1
9.
2023 
Performanc
e
27/02/2023
Service  Sustainability 
Due to competing service priorities and workforce/ operational
and financial challenges there is a risk that the IJB will be
unable to implement the strategic plan/commission plan.
Failure to achieve the desired strategic aims of the IJB poses a
risk on operational service delivery and the achievement of
financial balance and patient safety   
High
CONTROLS 
IJB PFA Committee. 
IJB Chief Officer is a member of each partner's key decision‐making forums.
Effective joint working between Chief Financial Officer and both Council and NHS
Finance Departments.
Regular budget meetings with Chief Executives and Directors of
Finance. Regular HSCP budget monitoring meetings across Senior
Leadership Team. The IJB Financial Plan is regularly reviewed and
agreed.
Capacity plans in place to maximize efficiency.
Consultation and involvement with key stakeholders including service users and
carers. Joint Strategic Needs Assessment and ongoing move towards preventative
and anticipatory approaches.
Strategic Planning Group, Locality engagement sessions and Partnership Boards.
Effective and ongoing service user engagement, staff consultation and Trade Union
liaison at strategic and local levels. 
ACTIONS
Sustainability plans to be reviewed
regularly Re‐introduction of scrutiny
panels
Improve linkage across all risk registers (tiers 1 to 3, council and NHS) to help ensure
areas of
concern are identified and  reviewed regularly.
Review of reporting process into IJB to ensure continuous review of services/
service developments.
Development of the programme of work to ensure regular reporting structure in place for
service review.
Operation Flow Task and Finish Groups analyzing service challenges and     
winter     
High   
Low 
Ross McGuffie 
Ross McGuffie 
SLT, IJB
PFA, IJB   
28.02.2024  
Reviewed and Updated May 2023 
Reviewed and Updated Oct
2023. Reviewed and updated
Jan 2024.
Reviewed April 2024. 
Reviewed Sept 2024 
IJB.2
0.
2023  
Workforce  Sustainability 
It is becoming increasingly difficult to recruit to particular roles
across Health and Social Care. Gaps in the workforce can result in
reduction of service provision, increase in staff workload and
inability to deliver the strategic plan. Following EU withdrawal there
is no longer the free movement of labour between the UK and EEA
countries. All workers arriving from the EEA and non‐EEA
countries are subject to the same immigration rules.The new
points‐based immigration system makes exceptions for the
majority of health care professionals with an NHS job offer and for
qualified social workers via a new fast ‐track visa route, known as
the Health and Care Worker Visa. There are however no
exceptions made for other social care roles, such as care
workers.The Mutual Recognition of Professional Qualifications
Directive is an EU ‐wide directive that allows professional
regulators in all member states to automatically recognise
professional qualifications. The UK government has decided to
continue recognising qualifications gained in the EEA for at least
two years after the transition period ends. This however is not a
reciprocal and there is no guarantee that qualifications gained in
the UK will be accepted by professional regulators in EEA nations.   
HIGH
CONTROLS 
All successful Health and Care Worker Visa applicants are exempt from the Immigration
Health Surcharge, a one‐off charge levied against   arriving migrant workers as part of the
visa application process. The system has been designed to make international
recruitment into health and social care roles more straightforward for employers and
employees alike. These changes to immigration rules are in law as part of the
Immigration and Social Security Co ‐ordination (EU Withdrawal) Act 2020. As such, from
1 January 2021, they apply to all workers arriving to work in the NHS or adult social care.
All workers from EEA nations who are already resident in the UK had until 30 June 2021
to apply for the EU Settlement Scheme which will guarantee their right to work in the UK
indefinitely.
In respect of the mutual recognition of professional qualifications, professional regulatory
bodies are working with the UK government to review future registration requirements for
those with qualifications gained in the EEA and decide what they will be from January
2023. 
Development of the Care Academy 
Dedicated HR support identified in NHSL and NLC to support key priority areas of
recruitment such as Mental Health and Home Support 
ACTIONS
Annual workforce plan being prepared
NHSL programme underway to support international
recruitment On the day recruitment events being trialed in
Home Support
Use of university status being explored following positive gains in Podiatry and
Psychological
Therapies  recruitment           
High   
Medium 
Ross McGuffie 
Ross McGuffie 
SLT, IJB
PFA, IJB 
28.07.24   
Updated May 2023 
Reviewed and updated Oct 2023. 
Reviewed and updated Jan 24 
Reviewed April 2024. 
Reviewed Sept 2024 
IJB21.24  Financial  Jun‐2
4
Pharmacy Pressures within Prison Service 
Pharmacy costs have traditionally been the highest area of non
‐pay spend nationally in all prisons. The nature of the patient cohort
results in high volumes of prescribed medication for Mental Health,
Pain, & Addictions purposes. There is currently a large overspend     
High
CONTROLS
Review of the dispense processes within the
prison Implementation of guidelines
Improved communication with pharmacy provider   High   
Low 
Ross 
Ross 
IJB  30.07. Added to register June 2024.

Page 17

May 2024) for the actual drugs bought and £246K associated
with the management fees for the contract. 
ACTIONS
Prescribing Action Group re‐established to try and manage the number of items
prescribed Development of pain and medicine management pathways
Review of prescribing habits   
uffie   
uffie  
IJB    4   
IJB23.2
4
Performanc
e
Speech and Language Therapy (SLT) Service 
High
CONTROLS 
1. Good communication processes, and the sharing of information and practical learning
online have been established and will be further developed as service improvement
work progresses.
2. Service model review to ensure that future TrakCare builds on local learning and
builds on organisational learning from other builds. Forward planning for inclusion in the
AHP Hub model will proceed in parallel to these TrakCare developments.
3. Revised workforce planning, incorporating the best‐practice and learning from other
areas who have specialist children’s health services units.
4. The professional relationships between service and university have already been
improved and we have academic representation that actively contributes to both our
Workforce Planning and Service Improvement Steering Group. 
ACTIONS
1. Working with university colleagues to identify new practitioners who have
expressed their desire to work in Lanarkshire on registration. This allows us to
maximise and enhance opportunities for placement, improvement projects and
induction planning, ensuring that we present ourselves as an area that is not only
welcoming but committed to the ongoing development of individuals and the service 
2. Work with professional colleagues to ensure that all activity is aligned to direct and/or
indirect pursuit of meeting the SLT waiting time target.
3. Transition from restrictive locality models for managing the waiting list. 
High 
Low 
Ross McGuffie 
Ross McGuffie 
IJB
PFA, IJB 
30.07.25   
Added to the register August
2024. 
Jul‐24 
There is a risk that the SLT service cannot meet the increasing
clinical demands with variance in waiting list length by area,
continued challenges around the recrutiment and retention of
new colleagues, funding streams from Local Authority being
reduce therefore reducing staff WTE.