Page 1

16/06/2022 
Notice of Meeting and Agenda
Glasgow & the Clyde Valley Strategic Development
Planning Authority Joint Committee. 
Date  Time Venue
Monday, 27 June 2022 11:15 Remotely by MS Teams ,                     
Membership
Councillor Jim Gibbons and Councillor Alan Moir (East Dunbartonshire Council); Councillor Paul
Edlin and Councillor Colm Merrick (East Renfrewshire Council); Councillor Kenny McLean and
Councillor Ken Andrew (Glasgow City Council); Councillor Chris Curley and Councillor David
Wilson (Inverclyde Council); tbc (North Lanarkshire Council); Councillor John McNaughtan and
tbc (Renfrewshire Council); Councillor Richard Nelson and Councillor Robert Brown (South
Lanarkshire Council); and Councillor Lawrence O’Neill and Councillor Gurpreet Singh Johal
(West Dunbartonshire Council). 
Further Information
For further information in relation to this meeting, please either email democratic-
services@renfrewshire.gov.uk or telephone 0141 618 7111.  
MARK CONAGHAN
Clerk 
Page 1 of 58

Page 2

16/06/2022
Items of business      
The Clerk to the Joint Committee will preside prior to the
election of the Convener 
Apologies
Apologies from members. 
Declarations of Interest
Members are asked to declare an interest in any item(s) on the agenda
and to provide a brief explanation of the nature of the interest. 
1 Appointment of Convener 
2 Appointment of Vice Convener 
3 Members of the Joint Committee
Report by Clerk. 
3 - 4 
4 Minute
Minute of meeting of the Joint Committee held on 14 March 2022. 
5 - 10 
5 Strategic Planning in a City Region Context
Presentation by the Strategic Development Plan Manager. 
6 Unaudited Annual Accounts 2021/22
Joint report by Treasurer and Strategic Development Plan Manager. 
11 - 44 
7 Internal Audit Annual Report 2021/22
Report by Chief Auditor. 
45 - 56 
8 Timetable of Meetings
Report by Clerk. 
57 - 58 
Page 2 of 58

Page 3

To: Glasgow and the Clyde Valley Strategic Development Planning Authority Joint
Committee 
On: 27 June 2022 
Report by
Clerk 
Joint Committee Membership 
1. Summary 
1.1 In accordance with the Minute of Agreement, each of the member councils,
following an ordinary election, shall, as soon as practicable thereafter, appoint
or reappoint local authority members to the Joint Committee who shall hold
office until they are re-appointed or replaced by the member councils. 
1.2 At the statutory meetings of the member councils, the following appointments
were made: 
East Dunbartonshire Council  
Councillor Jim Gibbons and Councillor Alan Moir 
East Renfrewshire Council 
Councillor Paul Edlin and Councillor Colm Merrick 
Glasgow City Council 
Councillor Ken Andrew and Councillor Kenny McLean 
Inverclyde Council 
Councillor Chris Curley and Councillor David Wilson 
North Lanarkshire Council 
to be confirmed
Item 3
Page 3 of 58

Page 4

Renfrewshire Council 
Councillor John McNaughtan and vacancy  
South Lanarkshire Council 
Councillor Richard Nelson and Councillor Robert Brown 
West Dunbartonshire Council 
Councillor Lawrence O’Neill and Councillor Gurpreet Singh Johal 
2.  Recommendation 
2.1 That the appointments be noted. 
Author: Elaine Currie, Senior Committee Services Officer
elaine.currie@renfrewshire.gov.uk
0141 618 7111
Page 4 of 58

Page 5

Minute of Meeting
Glasgow & the Clyde Valley Strategic Development
Planning Authority Joint Committee. 
Date Time Venue
Monday, 14 March 2022 11:15 Remotely by MS Teams, 
Present
Councillor Stewart Miller (East Renfrewshire Council); Bailie Glenn Elder and Councillor
Kenny MacLean (both Glasgow City Council); Councillor David Wilson (Inverclyde Council);
Councillor Harry Curran (North Lanarkshire Council); Councillor Alistair Fulton (South
Lanarkshire Council); and Councillor Lawrence O’Neill (West Dunbartonshire Council). 
Chair
Councillor O’Neill, Convener, presided. 
In Attendance
S Tait, Strategic Development Plan Manager (Strategic Development Plan Core Team); H
Holland, Executive Officer – Land Planning and Development (East Dunbartonshire
Council); J Nicol, Principal Planner (East Renfrewshire Council); S Taylor, Principal Planner
(Glasgow City Council); S Jamieson, Head of Regeneration and Planning (Inverclyde
Council); L Bowden, Business Manager (Strategic Planning) (North Lanarkshire Council);
D Love, Chief Planning Officer, K Festorazzi, Senior Accountant, E Currie, Senior
Committee Services Officers and D Cunningham, Assistant Committee Services Officer (all
Renfrewshire Council); and T Finn, Planning and Building Services Headquarters Manager
(South Lanarkshire Council). 
Apologies
Councillor Alan Moir (East Dunbartonshire Council); Provost Jim Fletcher (East
Renfrewshire Council); Councillor Jim Clocherty (Inverclyde Council); Councillor Agnes
Magowan (North Lanarkshire Council); Councillor Tom Begg (Renfrewshire Council); and
Councillor Jonathan McColl (West Dunbartonshire Council).  
Item 4
Page 5 of 58

Page 6

Declarations of Interest
There were no declarations of interest intimated prior to the commencement of the
meeting. 
1 Minute
There was submitted the Minute of the meeting of this Joint Committee held on 13
December 2021. 
DECIDED: That the Minute be approved. 
2 Clerk and Treasurer
There was submitted a report by the Clerk relative to the Clerk and Treasurer of the
Joint Committee. 
The report advised that Ken Graham, Head of Corporate Governance, and Clerk to the
Joint Committee retired from Renfrewshire Council on 28 February 2022. Mark
Conaghan had been appointed as Head of Corporate Governance with effect from 1
March 2022 and would be Clerk to the Joint Committee from that date. 
The report further advised that Alan Russell, Treasurer to the Joint Committee, had
been appointed to the position of Chief Executive, Renfrewshire Council, on 12
November 2021. Alastair MacArthur had been appointed as Director of Finance &
Resources and would be Treasurer to the Joint Committee with effect from 16 February
2022. 
DECIDED: That it be noted that Mark Conaghan would be Clerk to the Joint Committee
with effect from 1 March 2022 and that Alastair MacArthur would be Treasurer to the
Joint Committee with effect from 16 February 2022. 
3 Revenue Budget Monitoring
There was submitted a joint revenue budget monitoring report by the Treasurer and the
Strategic Development Plan Manager for the period 1 April 2021 to 4 February 2021. 
The report intimated that, at the end of period 11, gross expenditure was £33,000
underspent and income was £29,000 over-recovered, resulting in a net underspend of
£62,000.  The projected year-end position was an underspend of £79,000, mainly due
to the reduction in premises costs due to the move from West Regent Street to John
Street; reduced spend due to COVID-19 and working from home arrangements; and
an over-recovery in income. 
DECIDED: That the report be noted. 
4 Audit Plan 2021/22 Update
There was submitted a report by the Treasurer providing an update in relation to the
audit plan for 2021/22. 
Page 6 of 58

Page 7

The report intimated that Audit Scotland submitted the annual audit plan, which outlined
the timescales and planned activity by Audit Scotland, to the Joint Committee in March
of each year. Owing to delays caused by the past two years’ audit timetables, the audit
plan for 2021/22 was not yet ready for publication and would therefore miss the Joint
Committee’s reporting cycle. 
The report advised that the annual audit plan for 2021/22 would be circulated to
members of the Joint Committee when available. 
The report further intimated that, given the local government elections in May of this
year, the unaudited annual accounts 2021/22 would be presented to the meeting of this
Joint Committee to be held in June 2022. 
DECIDED: That the report be noted. 
5 Annual Report 2021
There was submitted a report by the Strategic Development Plan Manager relative to
Clydeplan’s Annual Report 2021, a copy of which was appended to the report. 
The report intimated that Clydeplan’s Minute of Agreement required that an annual
report be prepared setting out the work of the authority for the previous calendar year.
The annual report 2021 provided an overview of the work undertaken by Clydeplan
during 2021 under the broad headings of Clydeplan Joint Committee; Glasgow City
Region; Planning (Scotland) Act - Regional Spatial Strategies and National Planning
Framework 4; Glasgow and the Clyde Valley Green Network Partnership evolution;
annual accounts and audit report; and the priorities and issues affecting the future work
of Clydeplan. 
DECIDED: 
(a) That the Annual Report 2021, as set out in the appendix to the report, be approved;
and 
(b) That it be agreed that, in accordance with the practice of previous years, an
enhanced version of the annual report be produced in order to promote the work of the
Joint Committee. 
6 Clydeplan Development Plan Scheme and Participation Statement
2022/23
There was submitted a report by the Strategic Development Plan Manager relative to
the Clydeplan Development Plan Scheme and Participation Statement 2022/23, a copy
of which was appended to the report. 
The report intimated that as part of the requirements of the Planning etc (Scotland) Act
2006, planning authorities were expected to publish a Development Plan Scheme and
Participation Statement and review it on an annual basis. Clydeplan published its first
Development Plan Scheme and Participation Statement on 31 March 2009, with
subsequent revisions published annually in March. The document would be published
on the Clydeplan website as well as being sent to Scottish Ministers. 
The report advised that the Development Plan Scheme and Participation Statement
2022/23 reflected the current position in respect of the recent Planning (Scotland) Act
2019, enacted in July 2019, which removed the statutory requirement to prepare a
Page 7 of 58

Page 8

Strategic Development Plan, replacing it with a duty on local authorities to prepare a
Regional Spatial Strategy (RSS). The RSS would not form part of the statutory
Development Plan which would now comprise the National Planning Framework and
the Local Development Plan. 
The report further advised that in support of the development of National Planning
Framework 4, the Scottish Government had required that local authorities prepare and
submit an indicative RSS by June 2020. Local authorities self-determined what their
indicative RSS comprised and how they would collaborate in its production. 
The report noted that guidance and regulations would be produced, informed by the
process of producing an indicative RSS, to enact the duty to produce an RSS, most
likely sometime in 2022, following approval of National Planning Framework 4 which
was anticipated to be in the summer of 2022. Clydeplan and Glasgow City Region were
committed to supporting the development of both the National Planning Framework 4
and RSS guidance. 
DECIDED: 
(a) That the Development Plan Scheme and Participation Statement 2022/23, as set
out in the appendix to the report, be adopted; and 
(b) That the Strategic Development Plan Manager be authorised to make the document
available online on Clydeplan’s website and on social media and submit it to Scottish
Ministers.  
Chair
Due to technical issues the Convener left the meeting and the Vice Convener,
Councillor Wilson, assumed the Chair. 
7 National Planning Framework 4
Under reference to item 4 of the Minute of the meeting of this Joint Committee held on
13 December 2021, there was submitted a report by the Strategic Development Plan
Manager relative to the Joint Committee’s response to the Scottish Government
consultation on the Draft National Planning Framework 4 (NPF4), a copy of which was
appended to the report. 
The report intimated that under the terms of the Planning (Scotland) Act 2019, the
requirement for Strategic Development Plans in the four largest city regions had been
removed and replaced with a requirement for all local authorities, working together as
they saw fit, to prepare Regional Spatial Strategies setting out strategic development
priorities. This part of the Act was not yet in force and was anticipated once NPF4 had
been approved by the Scottish Government. 
The report advised that, once approved by the Scottish Government, NPF4 would form
part of the statutory Development Plan with the current Clydeplan Strategic
Development Plan no longer being part of the Development Plan. 
The report further advised that the Draft NPF4 consultation closed on 31 March 2022
and the proposed response by the Joint Committee was appended to the report. It was
noted that the Glasgow City Region’s Regional Partnership would consider the
endorsement of the Joint Committee’s response at its meeting to be held on 17 March
2022. 
Page 8 of 58

Page 9

The Joint Committee considered the response appended to the report and the further
detail provided in section 6 of the report. 
DECIDED: That the Joint Committee approve the response to the Scottish
Government’s consultation on NPF4. 
8 Change to Date of Meeting
There was submitted a report by the Clerk relative to the date of the next meeting of
the Joint Committee. 
The report intimated that at the meeting of the Joint Committee held on 12 June 2017,
it was decided that meeting dates be agreed for the five-year term from 2017 to 2022
and that in 2022 meetings be held at 11.15 am on 14 March and 13 June 2022. 
The report proposed that the meeting of this Joint Committee scheduled to be held at
11.15 am on 13 June 2022 be rescheduled to 11.15 am on 27 June 2022. 
DECIDED: That it be agreed that the meeting of this Joint Committee scheduled to be
held at 11.15 am on 13 June 2022 be rescheduled to 11.15 am on 27 June 2022. 
Page 9 of 58

Page 10

Page 10 of 58

Page 11

GLASGOW AND THE CLYDE VALLEY STRATEGIC DEVELOPMENT PLANNING
AUTHORITY JOINT COMMITTEE 
To: Joint Committee
On: 27 June 2022
___________________________________________________________________
Report by: The Treasurer and the Strategic Development Plan Manager
___________________________________________________________________
Heading: Unaudited Annual Accounts 2021/22
___________________________________________________________________
1. Summary 
1.1 The Annual Accounts for the year ended 31 March 2022 will be submitted to
Audit Scotland in advance of the statutory deadline of 30 June 2022 and a
copy is attached for consideration.
 
1.2 The Joint Committee has returned a deficit of £69,764 for the financial year
2021/22. This results in an underspend of £85,436 against the planned deficit
of £155,200 
1.3 The Management Commentary within the accounts provides an overview of the
Committee’s financial performance during 2021/22, along with its outlook for
the future.
___________________________________________________________________ 
2 Recommendations 
2.1 The Joint Committee is asked to:
a) Consider the Unaudited Annual Accounts for 2021/22; 
b) Approve the Annual Governance Statement (pages 6-8); and
c) Note the final budget monitoring position for 2021/22. 
___________________________________________________________________
3. Background 
3.1. The Local Authority Accounts (Scotland) Regulations 2014 require the Joint
Committee to prepare and publish a set of accounts, including an Annual
Governance Statement, by 30 June each year. 
Item 6
Page 11 of 58

Page 12

3.2. The unaudited accounts are then required to be formally considered by the
Committee no later than 31 August and the Annual Governance Statement
should be formally approved at this time.   
3.3. In accordance with the Local Authority Accounts (Scotland) Regulations
2014, the Unaudited Annual Accounts will then be signed only by the
Treasurer as proper officer. 
3.4. The accounts are then subject to external audit by the Committee’s
appointed auditor, Audit Scotland, by 30 November 2022.  The 2021/22
Audited Annual Accounts are scheduled to be presented to the Joint
Committee on 12 September 2022 for approval and signing by the Chair, the
Lead Officer and the Treasurer, in accordance with the regulations. 
3.5. The Comprehensive Income and Expenditure Statement on page 11 shows
an accounting deficit on the Provision of Services of £180,537.   
3.6. The Expenditure and Funding Analysis on page 14 shows how this differs
from the budgetary deficit of £69,764 due to accounting adjustments for
pension costs and the statutory employee leave accrual.   
3.7. The Balance Sheet on page 13 of the Annual Accounts shows an increase in
net worth of £469,463 compared to last year, which is largely driven by the
movement in the pension liability.  This is explained further in the
Management Commentary within the accounts. 
Page 12 of 58

Page 13

Description Agreed Annual 
Budget Actual
(1) (2) (4) (5)
£000's £000's £000's £000's %
Employee Costs 493 485 8 1.6% underspend
Premises Related 24 2 22 91.7% underspend
Supplies & Services 48 26 22 45.8% underspend
Support Services 20 24 (4) ‐19.0% overspend
Transfer Payments 3 3 0 0.0% breakeven
Transport Costs 5 0 5 100.0% underspend
GROSS EXPENDITURE 593 540 53 8.9% underspend
Contributions from Local Authorities (420) (420) 0 0.0% breakeven
Other Income (19) (50) 32 0.0% over‐recovery
INCOME (438) (470) 32 7.2% over‐recovery
TRANSFER (TO)/FROM RESERVES 155 70 85
£000's
Bottom Line Position to 31st March 2022 is an underspend of  85
Opening Reserves (384)
Budgeted drawdown from Reserves 155
21/22 Underspend (85)
Closing Reserves (314)
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2021/22
1st April 2021 to 31st March 2022
Budget Variance
JOINT COMMITTEE : GLASGOW & CLYDE VALLEY STRATEGIC DEVELOPMENT PLANNING AUTHORITY
Page 13 of 58

Page 14

Page 14 of 58

Page 15

Unaudited Annual Accounts
2021/22 
Page 15 of 58

Page 16

Page 16 of 58

Page 17

CONTENTS 
Management Commentary ............................................................................................................................. 1
Statement of Responsibilities for the Annual Accounts .................................................................................. 5
Annual Governance Statement ....................................................................................................................... 6
Remuneration Report ..................................................................................................................................... 9
Comprehensive Income and Expenditure Statement ................................................................................... 11
Movement in Reserves Statement ................................................................................................................ 12
Balance Sheet ............................................................................................................................................... 13
Note 1: Expenditure Funding Analysis .......................................................................................................... 14
Note 2: Accounting Standards Issued not Adopted ...................................................................................... 15
Note 3: Unusable Reserves ........................................................................................................................... 15
Note 4: Events after the Balance Sheet date ................................................................................................ 16
Note 5: Adjustments between Accounting Basis and Funding Basis under Regulations ............................... 16
Note 6: Debtors ............................................................................................................................................ 17
Note 7: Creditors .......................................................................................................................................... 17
Note 8: Related parties ................................................................................................................................. 17
Note 9: External audit costs .......................................................................................................................... 17
Note 10: Retirement Benefits ....................................................................................................................... 18
Note 11: Contingent Liabilities ...................................................................................................................... 20
Note 12: Agency Services .............................................................................................................................. 21
Note 13: Summary of Significant Accounting Policies ................................................................................... 21
Note 14: Assumptions made about the future ............................................................................................. 24
Note 15: Green Network Partnership ........................................................................................................... 25 
Page 17 of 58

Page 18

Page 18 of 58

Page 19

1
Management Commentary 
The purpose of the Management Commentary is to
present an overview of Clydeplan’s financial
performance during the year 2021/22 and to help
readers understand its financial position as at 31
March 2022. In addition, it outlines the main risks and
uncertainties facing Clydeplan for the financial year
2021/22 and beyond. 
History and Background 
The Glasgow and Clyde Valley Strategic Development
Planning Authority (GCVSDPA) was created in 2008,
when the Scottish Government established Strategic
Development Planning Authorities for each of the four
Scottish city regions. 
In 2014 the GCVSDPA rebranded as ‘Clydeplan’ to
improve recognition and gain wider resonance within
the region. The principal role of Clydeplan is to prepare
and maintain an up-to-date Strategic Development
Plan (SDP) for the region. This process involves
engagement through joint working and consultation
with key stakeholder organisations and the wider
community. 
Clydeplan is a Joint Committee formed under Section
57 of the Local Government (Scotland) Act 1973. The
Joint Committee is comprised of the following eight
local authorities:
• East Dunbartonshire Council;
• East Renfrewshire Council;
• Glasgow City Council;
• Inverclyde Council;
• North Lanarkshire Council;
• Renfrewshire Council;
• South Lanarkshire Council; and,
• West Dunbartonshire Council.
The Joint Committee is comprised of two members
from each constituent authority.  During 2021/22, the
Chair of the Joint Committee was Councillor Lawrence
O’Neill of West Dunbartonshire Council and Vice-Chair
was Councillor David Wilson of Inverclyde Council. 
A Joint Committee is not a separate legal entity,
therefore, to ensure its actions have legal effect it
must appoint a ‘lead authority’ with legal personality
to act on its behalf to implement its decisions. The
lead authority appointed to act for Clydeplan is
currently Renfrewshire Council. 
The Joint Committee is supported by a Steering
Group comprising the Strategic Development Plan
Manager and the Chief Planning Officers (or their
representatives) of each of the member authorities.
The Steering Group meets at least four times a year
to consider SDP and regional spatial planning related
activity, consultations and reports presented to the
Joint Committee on the work programme to be
undertaken by the Clydeplan Core Team. 
The Glasgow Clyde Valley Green Network Partnership
(GCVGNP) has a strong relationship with Clydeplan
and an overview of the Partnership is provided at
Note 15: Green Network Partnership on page 25. 
Strategic Development 
The SDP covers a period of 20 years, with the current
SDP being approved by Scottish Ministers on 24 July
2017. The SDP sets out a clear vision and spatial
strategy for the Glasgow City Region with a focus on
the key land use and development. It also sets out a
policy framework to help deliver sustainable
economic growth and enhance the quality of life in
the Glasgow City Region. 
Planning (Scotland) Act 2019 
The Planning (Scotland) Act 2019 became law on 25
July 2019. The new act places a duty on Local
Authorities to prepare ‘Regional Spatial Strategies’,
rather than SDPs. 
The development of this strategy will be influenced
and integrated into the Glasgow City Region processes
and structures in terms of engagement and
Page 19 of 58

Page 20

2
governance through related Portfolio groupings,
including:
• Land Use and Sustainability;
• Transport and Connectivity;
• Housing and Equalities;
• Infrastructure and Assets;
• Economic Delivery Group. 
The principle focus for 2022/23 will involve working
closely with the Clydeplan’s Steering Group and the
City Region’s Land Use and Sustainability portfolio to
support the implementation of the new Planning
(Scotland) Act 2019 and related City Region activities
including, following approval of the National Planning
Framework 4 (NPF4) by the Scottish Parliament
(anticipated Summer 2022) of the development of a
Regional Spatial Strategy. 
In support of the development of NPF4 the Joint
Committee approved its response to the NPF4
consultation at its meeting held on 14 March 2022. 
In fulfilment of its Minute of Agreement and the
existing requirements of the 2006 Planning Act, the
Joint Committee approved its Annual Report and its
Development Plan Scheme and Participation
Statement in March 2022.  These documents can be
accessed at the following web links: 
• Annual Report - https://www.clydeplan-
sdpa.gov.uk>Strategic Development Plan>Annual
Reports
• Development Plan Scheme and Participation
Statement - https://www.clydeplan-
sdpa.gov.uk>Strategic Development
Plan>Development Plan Scheme and Participation
Statement
Primary Financial Statements 
The Annual Accounts are prepared in accordance with
the International Accounting Standards Board
Framework for the Preparation and Presentation of
Financial Statements as interpreted by the Code of
Practice on Local Authority Accounting in the United
Kingdom (the Code). Under Section 106 of Local
Government (Scotland) Act 1973, Joint Committees
are classed as local authorities. 
The Annual Accounts summarise the Joint
Committee’s transactions for the year and its year-
end position at 31 March 2022. The Primary Financial
Statements include the Comprehensive Income and
Expenditure Statement (CIES), the Movement in
Reserves Statement (MIRS) and the Balance Sheet. 
These statements are accompanied by Notes to the
Accounts, which provide more details on the figures
shown in the statements and set out the Accounting
Policies adopted by the Joint Committee. 
Financial Performance 
Revenue 
The Comprehensive Income and Expenditure
Statement (CIES) on page 11 summarises the total
costs of providing services and the income available to
fund those services. 
The Joint Committee has returned a deficit of £69,764
for the financial year 2021/22. This results in an
underspend of £85,436 against the planned deficit of
£155,200. This excludes accounting adjustments
relating to pensions and short-term accumulating
compensated absences.   
The difference between the Employee Costs figure
below and the figure reported in the CIES is due to the
accounting adjustments for pension costs of £105k
and accrued employee benefits of (£3k). 
A summary of the final outturn position against the
approved budget for Clydeplan is shown below. 
Page 20 of 58

Page 21

3
Budget Actual Variance
£ £ £
Employee Costs 493,700 484,257 9,443
Property Costs 24,200 2,295 21,905
Supplies and Services 47,600 25,773 21,827
Support Services 20,500 24,050 (3,550)
Transfer Payments 2,900 2,728 172
Transport Payments 4,500 442 4,058
Total Expenditure 593,400 539,545 53,855
Requisition Income (419,500) (419,500) 0
Other Income (18,700) (50,281) 31,581
Total Income (438,200) (469,781) 31,581
(Surplus)/Deficit for Year 155,200 69,764 85,436 
Employee Costs underspent due to the secondment of
a post to the City Region Team, which was budgeted
until 31 March 2022, ending in December 2021. 
Property Costs underspent against budget due to
Clydeplan moving into 40 John Street Glasgow, where
costs are substantially lower, upon expiry of the
previous lease of West Regent Street. 
Supplies and Services underspend is mostly
attributable to home-working due to COVID-19. This
has resulted in reduced spending on postage, printing
and stationery. Further underspends arise in market
research, consultancy and printing of maps and plans,
due to the move from SDP to preparing Regional
Spatial Strategies. 
Other Income is over-recovered mainly due to
secondment income from the City Region Team at
Glasgow City Council. 
Requisition income is break even. A one-off reduction
of £20k per authority was agreed at Clydeplan’s
December 2020 meeting, in order to decrease
reserves to an appropriate level. 
The Balance Sheet at 31
March 2022 
The Balance Sheet sets out the total net worth of the
Joint Committee at a snapshot in time. When
comparing the net worth of Clydeplan at 31 March
2022 to that of the prior year, an overall increase in
net worth of the organisation of £469k can be seen.
This is primarily due to the increase in pension asset
explained below. 
Net Pension Position 
The disclosure requirements for pension benefits
under IAS19 are detailed at Note 10: Retirement
Benefits. The appointed actuaries have confirmed a
net asset position of £189k, an increase of £536k in
their assessment of Clydeplan’s share of the pension
fund asset. This can be attributed  to higher than
expected investment returns and an increase in the
net discount rate (discount rate net of inflation)
compared to the previous year’s Accounting Date. 
A potential change to pension rules is outlined in Note
11: Contingent Liabilities on page 20; however, this
has not been reflected in the pension liability reported
in the Balance Sheet. 
Page 21 of 58

Page 22

4
Reserves 
Reserves are classified under accounting regulations
into two categories: Usable reserves, which are
available to spend; and Unusable reserves, which are
unrealised net gains or losses that have a deferred
impact on the Joint Committee. 
The balance on the Usable Revenue Reserve at 31
March 2022 is £314k. 
Outlook and Future Plans 
Governance 
It is recognised that all eight Glasgow City Region
local authorities who are currently involved with the
Glasgow and Clyde Valley Strategic Development
Planning Authority Joint Committee wish to continue
to contribute towards the strategic planning of the
City Region.   
Clydeplan will continue to keep the Joint Committee
apprised of any significant changes and will work
closely with its constituent local authorities and
partners to develop a work programme relevant to the
delivery of the first Regional Spatial Strategy for the
Glasgow City Region under the terms of the Planning
(Scotland) Act. 
The documents relating to the future of Clydeplan can
be accessed at the following web link;
https://renfrewshire.cmis.uk.com/renfrewshire/Meeti
ngs/tabid/70/ctl/ViewMeetingPublic/mid/397/Meetin
g/2059/Committee/70/Default.aspx
Budget 2022/23 
The 2022/23 budget for ClydePlan was approved by
the Joint Committee on 13 December 2021. 
Clydeplan expenditure budget has decreased for
2022/23, in line with reductions in Premises Costs and
Supplies and Services. Furthermore, in recognition of
the high level of reserves, a further reduction of
requisition is made in 2022/23 to contributing
authorities, totalling £32,500. 
COVID-19 Lockdown: Remote
Working 
During the COVID-19 lockdown period, Clydeplan has
continued to operate effectively, with all staff
working from home.  Normal governance procedures,
such as the Joint Committee meetings, have
continued, albeit on a virtual / remote basis. 
Conclusion 
We would wish to take this opportunity to
acknowledge the team effort required to produce the
accounts and to record our thanks to both the
Strategic Development Plan Manager and all staff for
their continued hard work and support. 
Councillor Stuart Tait Alastair MacArthur
Convener Strategic Development Plan Manager Treasurer   
Page 22 of 58

Page 23

5
Statement of Responsibilities for the Annual Accounts 
The Joint Committee’s
Responsibilities 
The Joint Committee is required to: 
• make arrangements for the proper administration
of its financial affairs and to secure that the
proper officer of the Joint Committee has the
responsibility for the administration of those
affairs (section 95 of the Local Government
(Scotland) Act 1973). The designated officer is
Renfrewshire Council’s Director of Finance and
Resources, who is also the Treasurer of Glasgow
and Clyde Valley Strategic Development Planning
Authority;
• manage its affairs to secure economic, efficient
and effective use of resources and safeguard its
assets;
• ensure that the Annual Accounts are prepared in
accordance with legislation (The Local Authority
Accounts (Scotland) Regulations 2014), and so far
as is compatible with that legislation, in
accordance with proper accounting practices
(section 12 of the Local Government in Scotland
Act 2003); and
• approve the Annual Accounts for signature. 
I confirm that these Unaudited Annual Accounts were
approved for signature by the Joint Committee at its
meeting on the 27 June 2022. 
Signed on behalf of Glasgow and Clyde Valley
Strategic Development Planning Authority Joint
Committee.
The Treasurer’s
Responsibilities 
The Treasurer is responsible for the preparation of the
Joint Committee’s Annual Accounts in accordance
with proper practices as required by legislation and as
set out in the CIPFA/LASAAC Code of Practice on Local
Authority Accounting in the United Kingdom (the
Code). 
In preparing the Annual Accounts, the Treasurer has: 
• selected suitable accounting policies and then
applied them consistently;
• made judgements and estimates that were
reasonable and prudent;
• complied with legislation; and
• complied with the local authority Accounting
Code (in so far as it is compatible with legislation). 
The Treasurer has also: 
• kept adequate accounting records that were up
to date; and
• taken reasonable steps for the prevention and
detection of fraud and other irregularities.
I certify that the financial statements give a true and
fair view of the financial position of the Joint
Committee at the reporting date and the transactions
of the Joint Committee for the year ended 31 March
2022.
Councillor
Convener
Alastair MacArthur  
Treasurer 
Page 23 of 58

Page 24

6
Annual Governance
Statement 
Scope of Responsibility 
Glasgow and Clyde Valley Strategic Development
Planning Authority’s Joint Committee is responsible
for ensuring that its business is conducted in
accordance with the law and proper standards, and
that public money is safeguarded, properly accounted
for, and used economically, efficiently and effectively. 
The Joint Committee also has a statutory duty to
make arrangements to secure best value under the
Local Government in Scotland Act 2003. In discharging
this overall responsibility, the Joint Committee’s
elected members and senior officers are responsible
for putting in place proper arrangements for its affairs
and facilitating the effective exercise of its functions,
which includes arrangements for the management of
risk 
The Joint Committee’s
Governance Framework 
The governance framework comprises the systems
and processes, and culture and values, by which the
Joint Committee is directed and controlled. It also
describes the way it engages with, and accounts to its
stakeholders. 
The Joint Committee has also put in place a system of
internal control designed to manage risk to a
reasonable level. Internal control cannot eliminate all
risk of failure to achieve policies, aims and objectives
and can therefore only provide reasonable and not
absolute assurance of effectiveness. 
The system of internal control is based on an ongoing
process designed to identify and prioritise the risks to
the achievement of the Joint Committee’s policies,
aims and objectives, to evaluate the likelihood of
those risks being realised and the impact should they
be realised, and to manage them efficiently,
effectively and economically.
The main features of our governance arrangements
are:
• A Minute of Agreement between the member
councils of the Joint Committee,
https://www.clydeplan-sdpa.gov.uk/planning-
authority/joint-committee, setting out the
arrangement for the preparation, monitoring and
review of the Strategic Development Plan;
• The Joint Committee is supported by a Steering
Group comprising planning professionals from
each of the member councils and the Strategic
Development Plan Manager; 
• The Development Plan Scheme and Participation
Statement sets out the key timelines for the
preparation of the Strategic Development Plan and
the Joint Committee’s approach to engagement
with our stakeholders on its development, this is
reviewed annually www.clydeplan-
sdpa.gov.uk/strategic-development-
plan/other/development-plan-scheme-and-
participation-statement;
• Clearly defined Standing Orders, Scheme of
Delegation and Financial Regulations;
• Comprehensive business planning arrangements,
setting key targets and action plans designed to
achieve the objectives of the Strategic
Development Plan;
• Public performance reporting through the Annual
Report;
• Policies to regulate employee related matters,
including the employee code of conduct and
disciplinary procedures;
• The Joint Committee approves, as part of the
Glasgow and Clyde Valley Green Network
Partnership’s Terms of Reference, the allocation of
local authority contributions to support the
delivery of its Business Plan;
• Risk management arrangements including regular
monitoring and review of significant risk
exposures;
• Business continuity arrangements are in place and
are kept under review by the Management Team. 
Page 24 of 58

Page 25

7
Within the overall control arrangements, the system
of internal financial control is intended to ensure that
assets are safeguarded, transactions are authorised
and properly recorded and material errors are
detected and corrected. The system is based on a
framework of management information, financial
regulations, administrative procedures (including
segregation of duties), management and supervision,
and a system of delegation and accountability. 
The system includes:
• Financial management is supported by
comprehensive financial regulations and codes;
• Comprehensive budgeting systems, and detailed
guidance for budget holders;
• Regular reviews of periodic and annual financial
reports which indicate financial performance
against the forecasts; 
• Setting targets to measure financial and other
performance;
• The preparation of regular financial reports that
indicate actual expenditure against the forecasts;
• The Chief Finance Officer is the Treasurer who
complies with the CIPFA Statement on the Role of
The CFO in Public Services. 
With Renfrewshire Council being the lead authority,
all financial transactions of the Joint Committee are
processed through the financial systems of the
Council and are subject to the same controls and
scrutiny as those of Renfrewshire Council. This
includes regular reviews by the Chief Internal Auditor
of Renfrewshire Council. 
Review of Effectiveness 
Members and officers of the Joint Committee are
committed to the concept of sound governance and
the effective delivery of services and take into account
comments made by internal and external auditors. 
The effectiveness of the governance framework is
reviewed annually by the Strategic Development Plan 
Manager, including the use of a self-assessment tool
covering five key areas of governance: 
• Business Planning and Performance Management;
• Internal Control Environment;
• Budgeting, Accounting and Financial Control;
• Risk Management and Business Continuity;
• Impact of Coronavirus (COVID-19). 
This self-assessment indicated that the governance
framework is being complied with in all material
respects. 
The Joint Committee’s internal audit service is
provided by the lead authority’s internal auditors and
operates in accordance with the Public Sector Internal
Audit Standards. The lead authority conforms to the
requirements of the CIPFA Statement on the Role of
the Head of Internal Audit (2019).  Internal Audit
undertakes an annual programme following an
assessment of risk completed during the strategic
audit planning process. 
The Chief Internal Auditor provides an annual report
to the Joint Committee and an independent opinion
on the adequacy and effectiveness of the system of
internal control. The Chief Internal Auditor’s annual
assurance statement concluded that a reasonable
level of assurance can be placed upon the adequacy
and effectiveness of the Joint Committee’s internal
control systems. 
The review has not identified any significant
governance issues to be reported on for 2021/22 and
no actions arising for the 2021/22 governance
statement that require to be reported on. 
This governance framework has been in place
throughout the year. The outbreak of coronavirus
(COVID-19) did not result in any changes to the
governance arrangements for 2021/22. During the
year officers have moved to a hybrid method of
working home with negligible impact on service
delivery and this arrangement will continue to be
reviewed regularly. Meetings of the Joint Committee
were also held virtually. The arrangements in place
Page 25 of 58

Page 26

8
are still considered to be effective. The risk of social
distancing continuing and its potential impact on the
governance arrangements continues to be reviewed
and monitored through robust risk management
arrangements. 
Planning (Scotland) Act 2019 
Following the Scottish Government’s review of the
Scottish planning system the Planning (Scotland) Act
came into effect on 25 July 2019. 
A key provision of the new Act was the removal of the
statutory duty on local authorities to prepare a
Strategic Development Plan, this being replaced with
a duty to prepare a Regional Spatial Strategy. 
The Regional Spatial Strategy will not form part of the
Statutory Development Plan, which is currently made
up of the Strategic Development Plan and Local
Development Plan. Under the terms of the new Act
this will instead comprise the National Planning
Framework and the Local Development Plan. 
The current Clydeplan Strategic Development Plan
(July 2017) will remain in force until the National
Planning Framework 4 is approved by the Scottish
Parliament, likely in Summer 2022 with Regional
Spatial Strategy Guidance expected to be published in
late 2022.
The Clydeplan Joint Committee at its meeting held on
8 March agreed that all eight local authorities
continue to work jointly to discharge their duty under
the Planning (Scotland) Act 2019 to prepare a
Regional Spatial Strategy. 
Assurance 
In conclusion, it is our opinion that the annual review
of governance together with the work of internal
audit, any comments received from external audit and
certification of assurance from the Strategic
Development Plan Manager provide sufficient
evidence that the principles of good governance
operated effectively and the Joint Committee
complies with its governance arrangements in all
material respects. Systems are in place to continually
review and improve the governance and internal
control environment. Future actions will be taken as
necessary to maintain and further enhance the Joint
Committee’s governance arrangements. 
Page 26 of 58

Page 27

9
Remuneration Report 
All information disclosed in the tables in this
Remuneration Report will be audited by the
appointed auditor, Audit Scotland.  The other sections
of the Remuneration Report will be reviewed by Audit
Scotland to ensure that they are consistent with the
financial statements. 
Remuneration policy for
elected members 
The Joint Committee makes no remuneration
payment to any elected member, nor does it pay any
expenses, fees or allowances to elected members.
Further, no recharges have been made by member
authorities in relation to elected member
remuneration. 
Remuneration policy for
senior employees 
The Remuneration Policy of the Joint Committee is set
in reference to national arrangements. The Scottish
Joint Negotiating Committee (SJNC) for Local
Authority Services sets the salaries for the Chief
Executives of Scottish local authorities. The salary of
the Strategic Development Planning Manager is set at
spinal point 29, which is currently the equivalent of
53% of the salary of the Chief Executive of
Renfrewshire Council.  These arrangements were
agreed through approval of the Chief Officers’ Award
– Structure Plan Manager report at a meeting of the
Joint Committee on 2 December 2002. The Assistant
Strategic Development Planning Manager and
Programme Manager posts have been evaluated
under the single status framework and are paid
according to the salary scales of Renfrewshire Council. 
2020/21 2021/22
Total Salary, fees
and allowances
Total Salary, fees
and allowances
£ £
79,323 Stuart Tait Strategic Development Plan Manager 80,678
56,111 Dorothy McDonald Assistant Strategic Development Plan Manager 56,814
135,434 Total 137,492
Name Post Held
The above tables show the relevant amounts, before
tax and other deductions, due to each of the persons
named for the year to 31 March 2022, whether or not
those amounts were actually paid within that period. 
Pension rights 
Pension benefits for Joint Committee employees are
provided through the Local Government Pension
Scheme (LGPS).  From 1 April 2015 benefits are based
on career average pay.  Pension benefits are based on
the pay received for each year in the scheme
increased by the increase in the cost of living, as
measured by the appropriate index (or indices).  The
scheme’s normal retirement age is linked to the state
pension age for each member.  
From 1 April 2009, a five-tier contribution system was
introduced with contributions from scheme members
being based on how much pay falls into each tier. This
is designed to give more equality between the cost
and benefits of scheme membership. Prior to 2009
contributions rates were set at 6% for all non-manual
employees. 
Equivalent bandings
for 2020/21
Up to £22,300 5.5% Up to £22,200
£22,301 to £27,300 7.25% £22,201 to £27,100
£27,301 to £37,400 8.5% £27,101 to £37,200
£37,401 to £49,900 9.5% £37,201 to £49,600
Over £49,901 12% Over £49,601
Tiered contribution rates on
whole time pay
2021/22
Page 27 of 58

Page 28

10
If a person works part-time their contribution rate is
worked out on the whole-time pay rate for the job,
with actual contributions paid on actual pay earned. 
There is no automatic entitlement to a lump sum.
Members may opt to give up (commute) pension for a
lump sum up to the limit set by the Finance Act 2004.
The accrual rate guarantees a pension based on 1/49th
of the pensionable pay for each year of membership,
adjusted in line with the cost of living.   
(Prior to 2015 the accrual rate guaranteed a pension
based on 1/60th of final pensionable salary). 
The value of the accrued benefits has been calculated
on the basis of the age at which the person will first
become entitled to receive a full pension on
retirement without reduction on account of its
payment at that age; without exercising any option to
commute pension entitlement into a lump sum; and
without any adjustment for the effects of future
inflation. 
The pension figures shown relate to the benefits that
the person has accrued as a consequence of their
total local government employment, not just that
relating to their current post. 
Pension Lump Sum Pension Lump Sum 2021/22 2020/21
£000 £000 £000 £000 £ £
Stuart Tait Strategic Development Plan
Manager 41 64 2 0 15,500 15,309
Dorothy
McDonald
Assistant Strategic
Development Plan Manager 29 46 2 1 10,965 10,829
Accrued Pension benefits as at 31 March 2022 Pension
Contributions made
by the Joint
Committee
Name Post Held
As at 31 March 2022
Change from
31 March 2021
No pension contributions are made for the Joint
Committee Convener or Vice-Convener. 
Remuneration of Employees 
The following table gives a statement of the number
of employees whose remuneration, excluding pension
contributions, was in excess of £50,000 during
2021/22, in bands of £5,000. 
2020/21 2021/22
Number of
employeesRemuneration Band
Number of
employees
0 £50,000 - £54,999 0
1 £55,000 - £59,999 1
1 £75,000 - £79,999 1
2 Total 2
Exit Packages 
Clydeplan has not agreed any exit packages in either
2021/22 or 2020/21. 
Councillor  
Convener       
Stuart Tait
Strategic Development Plan Manager 
Page 28 of 58

Page 29

11
Comprehensive Income and Expenditure Statement 
This statement shows the accounting cost of providing services and managing the Joint Committee during the year. It
includes, on an accruals basis, all of the Joint Committee’s day-to-day expenses and related income. It also includes
transactions measuring the value of non-current assets actually consumed during the year and the real projected
value of retirement benefits earned by employees during the year. The statement shows the accounting cost in
accordance with generally accepted accounting practices, rather than the cost according to the statutory regulations
that specify the net expenditure that local authorities need to take into account. The required adjustments between
accounting basis and funding basis under regulations are shown in the Movement in Reserves Statement. 
Gross
Expenditure
Gross
Income
Net
Expenditure
Gross
Expenditure
Gross
Income
Net
Expenditure
£ £ £ Note £ £ £
566,332 0 566,332 Employee Costs 586,030 0 586,030
2,160 0 2,160 Premise Costs 2,295 0 2,295
55,108 0 55,108 Supplies & Services 25,773 0 25,773
19,970 0 19,970 Support Costs 24,050 0 24,050
1,917 0 1,917 Transfer Payments 2,728 0 2,728
371 0 371 Transport Costs 442 0 442
0 (109,759) (109,759) Other Income 0 (49,944) (49,944)
645,858 (109,759) 536,099 Cost of Services 641,318 (49,944) 591,374
0 (1,514) (1,514) Interest receivable 0 (337) (337)
6,000 0 6,000 Pension interest cost 9,000 0 9,000
0 (579,500) (579,500) Requisitions from Member
Authorities 8 0 (419,500) (419,500)
651,858 (690,773) (38,915) (Surplus)/Deficit on the
Provision of Services 650,318 (469,781) 180,537
81,000 Actuarial (Gain)/Loss on
pension assets and liabilities
10 (650,000)
42,085 Total Comprehensive Income and Expenditure (469,463)
2021/222020/21
Financing and Investment Income
and Expenditure
Other Comprehensive Income &
Expenditure
Taxation and Non-Specific Grant
Income
Note: Figures in brackets represent income or gains and figures without brackets represent expenditure or losses. 
Page 29 of 58

Page 30

12
Movement in Reserves Statement 
This statement shows the movement in the year on the different reserves held by the Joint Committee, analysed
into usable reserves (that is, those reserves that can be applied to fund expenditure) and unusable reserves. The
surplus or deficit on the provision of services line shows the true economic cost of providing the Joint Committee’s
services, more details of which are shown in the Comprehensive Income and Expenditure Statement. 
Movement in reserves during the year Note
Usable
Reserves
Unusable
Reserves
Total
Reserves
£ £ £
Balance at 1 April 2021 (383,872) 356,332 (27,540)
Total Comprehensive Income and Expenditure 180,537 (650,000) (469,463)
Adjustment between accounting basis and funding basis under
regulation
5 (110,773) 110,773 0
Increase or (decrease) in year 69,764 (539,227) (469,463)
Balance at 31 March 2022 carried forward (314,108) (182,895) (497,003)
Note
Usable
Reserves
Unusable
Reserves
Total
Reserves
£ £ £
Balance at 1 April 2020 (279,942) 210,317 (69,625)
Total Comprehensive Income and Expenditure (38,915) 81,000 42,085
Adjustments between accounting basis and funding basis under
regulations
5 (65,015) 65,015 0
Increase or (decrease) in year (103,930) 146,015 42,085
Balance at 31 March 2021 carried forward (383,872) 356,332 (27,540)
Comparative movements in 2020/21
Page 30 of 58

Page 31

13
Balance Sheet 
The Balance Sheet shows the value as at 31 March 2022 of the assets and liabilities recognised by the Joint
Committee. The net assets of the Joint Committee (assets less liabilities) are matched by the reserves held. Reserves
are reported in two categories. The first category comprises usable reserves, which are those reserves that the Joint
Committee may use to provide services, subject to the need to maintain a prudent level of reserves and any
statutory limitations on their use. The second category of reserves comprises those that the Joint Committee is not
able to use to provide services. This category includes reserves that hold unrealised gains and losses in the value of
assets. 
As at 31 March
2021
As at 31 March
2022
£ £
493,396 Funds held by Renfrewshire Council 315,265
15,162 Debtors and Prepayments 6 1,215
508,558 Current Assets 316,480
(134,018) Creditors And Accruals 7 (8,477)
(134,018) Current Liabilities (8,477)
(347,000) Pension (Liability) / Asset 10 189,000
(347,000) Long Term Liabilities 189,000
27,540 Net Assets / (Liabilities) 497,003
(383,872) Usable Reserves (314,108)
356,332 Unusable Reserves 3 (182,895)
(27,540) Total Reserves (497,003)
Note
The unaudited accounts were issued on 27 June 2022. 
Alastair MacArthur
Treasurer   
Page 31 of 58

Page 32

14
Note 1: Expenditure Funding Analysis 
This statement shows how annual expenditure is used and funded from resources and provides a reconciliation of
the statutory adjustments between the Joint Committees financial performance on a funding basis and the Surplus
or deficit on the Provision of Service in the Comprehensive Income and Expenditure statement. 
Net Expenditure
chargeable to
the Joint
Committee
Adjustments for
pensions
Other
adjustments
Net Expenditure
in the CIES
£ £ £ £
Employee Costs 484,257 105,000 (3,227) 586,030
Premises Costs 2,295 0 0 2,295
Supplies & Services 25,773 0 0 25,773
Support Costs 24,050 0 0 24,050
Transfer Payments 2,728 0 0 2,728
Transport Costs 442 0 0 442
Other Income (50,281) 0 337 (49,944)
Cost of Services 489,264 105,000 (2,890) 591,374
Other income and expenditure (419,500) 9,000 (337) (410,837)
(Surplus)/Deficit on the Provision of Service 69,764 114,000 (3,227) 180,537
Net Expenditure
chargeable to
the Joint
Committee
Adjustments for
pensions
Other
adjustments
Net Expenditure
in the CIES
£ £ £ £
Employee Costs 507,317 58,000 1,015 566,332
Premises Costs 2,160 0 0 2,160
Supplies & Services 55,108 0 0 55,108
Support Costs 19,970 0 0 19,970
Transfer Payments 1,917 0 0 1,917
Transport Costs 371 0 0 371
Other Income (111,273) 0 1,514 (109,759)
Cost of Services 475,570 58,000 2,529 536,099
Other income and expenditure (579,500) 6,000 (1,514) (575,014)
(Surplus)/Deficit on the Provision of Service (103,930) 64,000 1,015 (38,915)
2021/22
2020/21
Page 32 of 58

Page 33

15
Note 2: Accounting Standards Issued not Adopted 
The Code requires the disclosure of information relating to the impact of an accounting change that will be required
by a new standard that has been issued but not yet adopted.  
There are no new standards that have a material impact on Clydeplan’s accounts. 
Note 3: Unusable Reserves 
Pension Reserve 
The Pension Reserve absorbs the timing differences arising from the different arrangements for accounting for post
-employment benefits and for funding benefits in accordance with statutory provisions.  The Joint Committee
accounts for post-employment benefits in the Comprehensive Income and Expenditure Statement as the benefits
are earned by employees accruing years of service, updating the liabilities recognised to reflect inflation, changing
assumptions and investment returns on any resources set aside to meet the costs.  However, statutory
arrangements require benefits earned to be financed as the Joint Committee makes employer’s contributions to
pension funds.   
The debit balance on the Pension Reserve shows a significant shortfall in the benefits earned by past and current
employees and the Joint Committee’s share of Strathclyde Pension Fund resources available to meet them.  The
statutory arrangements ensure that funding will have been set aside by the time the benefits come to be paid. 
2020/21 2021/22
£ £
202,000 Balance as at 1 April 347,000
81,000 Actuarial (Gain)/Loss on pension assets and liabilities (650,000)
64,000 Reversal of items relating to retirement benefits charged to the Surplus or Deficit on
the Provision of Services in the CIES 114,000
347,000 Balance as at 31 March (189,000)
Pension Reserve
Employee Statutory Adjustment Account 
The Employee Statutory Adjustment Account absorbs the differences that would otherwise arise on revenue
balances from accruing for short-term accumulating compensated absences at the end of the financial year. 
Generally accepted accounting practices require that all short-term employee benefits, including accumulating
compensated absences, should be recognised as a cost in the accounts for the year to which they relate.  This means
that where employees’ full holiday entitlement has not been taken by the financial year-end, the cost of the untaken
days or time is calculated and recorded as an accrued expense.  However, statutory arrangements require that the
impact of such accrued expenditure on revenue balances is neutralised by transfers to or from the Employee
Statutory Adjustment Account. 
Page 33 of 58

Page 34

16
2020/21 2021/22
£ £
8,317 Balance as at 1 April 9,332
(8,317) Reversal of prior year accrual for short-term accumulating compensated absences (9,332)
9,332 Recognition of the accrual for short-term accumulating compensating absences at 31
March
6,105
9,332 Balance as at 31 March 6,105
Employee Statutory Adjustment Account
Note 4: Events after the Balance Sheet date 
Events taking place after the authorised for issue date per the Balance Sheet are not reflected in the financial
statements or notes. Where events taking place before this date provided information about conditions existing at
31 March 2022, the figures in the financial statements and notes have been adjusted in all material respects to
reflect the impact of this information. 
Note 5: Adjustments between Accounting Basis and Funding
Basis under Regulations 
The surplus for the year on the Revenue Reserves was £110,773 less than the Comprehensive Income and
Expenditure Statement result.  The table below gives a breakdown of the differences between the income and
expenditure included in the Joint Committee’s Comprehensive Income and Expenditure Statement in accordance
with the Code and the amounts that statute and non-statutory proper practice require the Joint Committee to debit
and credit the Revenue Reserve Balance. 
Usable
Reserves
Unusable
Reserves
£ £
Adjustments primarily involving the Pension Reserve:
Net charges made for retirement benefits in accordance with IAS19 (180,000) 180,000
Employers contributions payable to the Strathclyde Pension Fund 66,000 (66,000)
Adjustments primarily involving the Employee Statutory Adjustment Account:
Net charges for employment short-term accumulating absences 3,227 (3,227)
Net additional amount required to be debited or credited to the Revenue Reserves
balance for the year (110,773) 110,773
2021/22
Usable
Reserves
Unusable
Reserves
£ £
Adjustments primarily involving the Pension Reserve:
Net charges made for retirement benefits in accordance with IAS19 (133,000) 133,000
Employers contributions payable to the Strathclyde Pension Fund 69,000 (69,000)
Adjustments primarily involving the Employee Statutory Adjustment Account:
Net charges for employment short-term accumulating absences (1,015) 1,015
Net additional amount required to be debited or credited to the Revenue Reserves
balance for the year (65,015) 65,015
2020/21
Page 34 of 58

Page 35

17
Note 6: Debtors 
As at 31
March
2021 Short-term Debtors
As at 31
March
2022
£ £
2,020 Prepayments 1,215
13,142 Other receivables 0
15,162 Total 1,215 
Note 7: Creditors 
As at 31
March 2021 Short-term Creditors
As at 31
March
2022
£ £
(9,332) Trade Payables (6,105)
(124,686) Other Payables (2,372)
(124,686) Total (8,477) 
Note 8: Related parties 
The Joint Committee’s related parties are those
bodies or individuals that have the potential to control
or significantly influence the Joint Committee, or to be
controlled or significantly influenced by the Joint
Committee. The Joint Committee is required to
disclose material transactions that have occurred with
related parties and the amount of any material sums
due to or from related parties. 
Related party relationships require to be disclosed
where control exists, irrespective of whether there
have been transactions between the related parties.
Disclosure of this information allows readers to assess
the extent to which the Joint Committee might have
been constrained in its ability to operate
independently or might have secured the ability to
limit another party’s ability to bargain freely with the
Joint Committee. 
The member authorities of the Joint Committee have
contributed requisitions in the following proportions
to enable the Joint Committee to carry out its
objectives.  The Joint Committee in turn pays
Renfrewshire Council for support services.   
The service level agreement for these services is
£23,200 (2020/21 £23,200). In previous years a
proportion of the cost was paid by the Green Network
Partnership, however in 2021/22 this was fully
absorbed by Clydeplan. 
2020/21 2021/22
£ % £
72,437.50 East Dunbartonshire 12.5% 52,437.50
72,437.50 East Renfrewshire 12.5% 52,437.50
72,437.50 Glasgow City 12.5% 52,437.50
72,437.50 Inverclyde 12.5% 52,437.50
72,437.50 North Lanarkshire 12.5% 52,437.50
72,437.50 Renfrewshire 12.5% 52,437.50
72,437.50 South Lanarkshire 12.5% 52,437.50
72,437.50 West Dunbartonshire 12.5% 52,437.50
579,500.00 GCVSDPA Funding 100.0% 419,500.00
Council
In addition to requisitions in the table there was
income of £49K from Glasgow City for a staff
secondment. 
Note 9: External audit costs 
2020/21 2021/22
£ £
3,040 Fees payable with regard to
external audit services carried
out by the appointed auditor
3,120
3,040 Total 3,120 
Page 35 of 58

Page 36

18
Note 10: Retirement Benefits
As part of the terms and conditions of employment of its employees, the Joint Committee offers retirement benefits.
Although these benefits will not actually be payable until employees retire, the Joint Committee has a commitment
to make the payments that need to be disclosed at the time that employees earn their future entitlement. The
scheme for employees is the Strathclyde Pension Fund which is administered by Glasgow City Council. This is a
“funded” defined benefit scheme meaning that the Joint Committee and its employees pay contributions into a
fund, calculated at a level intended to balance the pensions liability with investment assets.
10a: Transactions relating to retirement benefits
The cost of retirement benefits is recognised in Gross Expenditure when they are earned by employees, rather than
when the benefits are eventually paid as pensions. However, the charge that is statutorily required to be made in the
accounts is based upon pension contributions payable by the Joint Committee in the year, and an adjustment is
made within the Movement in Reserves Statement to replace the cost of retirement benefits with employers’
contributions. The following transactions have been made in the accounting statements in 2021/22:
2020/21 2021/22
£ £
Comprehensive Income & Expenditure Statement (CIES)
127,000 Current service cost 171,000
127,000 171,000
Financing and Investment Income & Expenditure
6,000 Net interest 9,000
133,000 Post-employment benefit charged to the Surplus/Deficit on the Provision of Services 180,000
Other post employment benefit charged to the CIES
(523,000) Return on assets excluding amounts included in net interest (274,000)
604,000 Actuarial (gains)/losses arising on changes in financial assumptions (376,000)
81,000 Total Actuarial (Gain)/Loss (650,000)
214,000 Total post employment benefit charged to the CIES (470,000)
Movement in Reserves Statement
(145,000) Reversal of net charges made to the Surplus or Deficit for the Provision of Services for
post employment benefits according with the Code
536,000
69,000 Employers Contributions paid to Strathclyde Pension Fund 66,000
Notes
• Current service cost is the cost of future entitlements to pension payments to current employees. 
• Past service cost is the estimated increase in liabilities arising from current decisions that relates to years of
service earned prior to this year. 
• In addition to the recognised gains and losses included in the CIES, an actuarial gain of £650k is included in the
Movement in Reserves Statement (2020/21 £81k loss).
• Net interest is an actuarial adjustment to the inflation element in the cost of funding current and future pension
obligations.  This is the expected increase during the year in the present value of the Joint Committee’s share of
Strathclyde Pension Fund’s liabilities because they are one year closer to settlement.
• The Joint Committee is also responsible for all pension payments relating to added years benefits it has
awarded, together with related increases. In 2021/22 these amounted to £9,171 (2020/21 £9,125).
Page 36 of 58

Page 37

19
10b: Assets and liabilities in relation to retirement benefits 
A reconciliation of the Joint Committee’s share of the present value of the Strathclyde Pension Fund’s liabilities is as
follows: 
2020/21 2021/22
£000 £000
4,327 Opening Present Value 5,109
127 Current service cost 171
101 Interest Cost 104
26 Employee Contributions 25
(76) Benefits Paid (78)
Remeasurement (gains)/losses:
604 Actuarial  (gains)/losses arising from changes in financial assumptions (376)
5,109 Closing Present Value 4,955 
A reconciliation of the Joint Committee’s share of the fair value of the Strathclyde Pension Fund’s assets is as follows: 
2020/21 2021/22
£000 £000
4,125 Opening Fair Value 4,762
95 Interest Income 95
69 Contributions from employer 66
26 Contributions from employee 25
(76) Benefits Paid (78)
Remeasurement gain/(loss):
523 Return on assets excluding amounts included in net interest 274
4,762 Closing Fair Value 5,144 
10c: Fund history 
2017/18 2018/19 2019/20 2020/21 2021/22
£000 £000 £000 £000 £000
Present Value of Liabilities (4,229) (4,881) (4,327) (5,109) (4,955)
Fair value of assets 4,036 4,295 4,125 4,762 5,144
Surplus/(deficit) in the scheme (193) (586) (202) (347) 189 
The main fund (Fund 1) of Strathclyde Pension Fund
does not have an asset and liability matching (ALM)
strategy. 
The net asset of £189k has a significant impact on the
net worth of the Joint Committee as recorded in the
Balance Sheet. Any deficit on the Strathclyde Pension
Fund will be made good by increased contributions
over the remaining working life of employees, as
assessed by the Fund actuary. The total contributions
expected to be made by the Joint Committee to
Strathclyde Pension Fund in the year to 31 March
2022 is £66k. 
Page 37 of 58

Page 38

20
10d: Basis for estimating
assets and liabilities 
The pension scheme’s assets consist of the following
categories, by proportion of the total assets held: 
2020/21 2021/22
£000 % £000
1,086 Equity Securities 22.0% 1,133
877 Private Equity 19.6% 1,007
387 Real Estate 8.4% 434
2,323 Investment Funds and  47.4% 2,439
89 Cash & Cash Equivalents 2.5% 131
4,762 99.9% 5,144 
The Joint Committee’s share of the liabilities of the
Strathclyde Pension Fund have been assessed on an
actuarial basis using the projected unit method, that
estimates the pensions that will be payable in future
years dependent upon assumptions about mortality
rates, salary levels and so on. The Scheme’s liabilities
have been assessed by Hymans Robertson, an
independent firm of Actuaries, and the estimates are
based on the latest full valuation of the Fund at 31
March 2022.  
The principal assumptions used by the actuary have
been:
2020/21 Mortality assumptions 2021/22
19.8 Men 19.6
22.6 Women 22.4
21.2 Men 21
24.7 Women 24.5
2020/21 Other assumptions 2021/22
3.6% Rate of increase in salaries 3.6%
2.9% Rate of increase in pensions 2.9%
2.0% Rate for discounting scheme
liabilities 2.0%
50.0% Pre-April 2009 service 50.0%
75.0% Post-April 2009 service 75.0%
Longevity at 65 for current pensioners (years)
Longevity at 65 for future pensioners (years)
Take-up of option to convert annual pension into
retirement lump sum:
10e: Impact on cashflows 
An objective of the fund is to keep employer’s
contributions at as constant a rate as possible. The
fund has agreed a strategy to achieve a funding rate
of 100% in the longer term. Employers’ and
employees’ contributions have been determined so
that rates are standard across all participating
employers. The rate for employer contributions has
been set at 19.3% for 2021/22 and 2022/23. 
Note 11: Contingent
Liabilities 
Guaranteed Minimum Pension (GMP) was accrued by
members of the Local Government Pension Scheme
between 6 April 1978 and 5 April 1997. The value of
GMP is inherently unequal between males and
females for a number or reasons, including a higher
retirement age for men and GMP accruing at a faster
rate for women; however overall equality of benefits
was achieved for public service schemes through the
interaction between scheme pensions and the Second
State Pension.   
The introduction of the new Single State Pension in
April 2016 disrupted this arrangement and brought
uncertainty over the ongoing indexation of GMPs,
which could lead to inequalities between men’s and
women’s benefits.   
Strathclyde Pension Fund’s actuary has carried out
calculations and estimates that the potential impact
of GMP indexation would be an increase in the
pension liability of approximately £21k for Clydeplan.
This estimate is not reflected in the Primary Financial
Statements because the trigger event that would
require recognition has not yet occurred. 
Following two court cases, including Mrs Goodwin v
Department for Education, it is expected that
proposed changes to public service pension schemes
will be required, to ensure that surviving same-sex
spouses and civil partners receive benefits equivalent
to those received by the surviving spouses of
Page 38 of 58

Page 39

21
opposite-sex marriages. Strathclyde Pension Fund’s
actuary estimates that the potential impact may be in
the range of 0.1%-0.2% of gross obligations, which
equates to between £5k and £10k for Clydeplan. This
estimate is not reflected in the Primary Financial
Statements because the trigger event that would
require recognition has not yet occurred. 
Note 12: Agency Services 
Clydeplan acts on behalf of Clyde Marine as an agent.
Funding is sent by Clyde Marine to Clydeplan’s bank
account and invoices are paid from this funding to
Clyde Marine’s suppliers. There is no operational
input by Clydeplan and no gain or loss to Clydeplan. 
These funds are not, therefore, included in the
financial results of Clydeplan. In 21/22 there was no
cash received and it was agreed that Clydeplan would
no longer facilitate this service, therefore, the cash
was returned to Clyde Marine. 
Note 13: Summary of
Significant Accounting Policies 
A General Principles 
The Annual Accounts summarise the Joint
Committee’s transactions for the 2021/22 financial
year and its financial position as at 31 March 2022.
The Joint Committee is required to prepare Annual
Accounts by the Local Authority (Scotland)
Regulations 2014 and section 12 of the Local
Government in Scotland Act 2003 requires these
accounts to be prepared in accordance with proper
accounting practices. 
These practices primarily comprise the Code of
Practice on Local Authority Accounting in the United
Kingdom (the Code), supported by International
Financial Reporting Standards (IFRS) and statutory
guidance issued under section 12 of the 2003 Act. 
The Code is issued jointly by the Chartered Institute of
Public Finance and Accountancy (CIPFA) and the Local
Authority (Scotland) Accounts Advisory Committee
(LASAAC) and is designed to give a true and fair view
of the financial performance of the Joint Committee. 
The accounting convention adopted in the Annual
Accounts is principally historical cost, modified by the
valuation of pension assets and liabilities where
appropriate. The Annual Accounts have been
prepared on a going concern basis. 
Materiality refers to a level of information or value of
such significance that it could influence the decisions
or assessments of users of the Annual Accounts by its
presence or omission. 
B Accruals of Expenditure
and Income 
Activity is accounted for in the year that it takes place,
not simply when cash payments are made or received.
In particular:
• Revenue from the sale of goods is recognised
when the Joint Committee transfers the
significant risks and rewards of ownership to the
purchaser, and it is probable that the economic
benefits or service potential associated with the
transaction will flow to the Joint Committee;
• Revenue from the provision of services is
recognised when the authority satisfies the
performance obligation of the transaction and it
is probable that the economic benefits or service
potential associated with the transaction will flow
to the Joint Committee;
• Supplies are recorded as expenditure when they
are consumed. Where there is a gap between the
date supplies are received and their consumption,
they are carried as inventories on the Balance
Sheet;
• Where income and expenditure have been
recognised but cash has not been received or
paid, a debtor or creditor for the relevant amount
is recorded in the Balance Sheet. Where there is
evidence that debts are unlikely to be settled, the
balance of debtors is written down and a charge
Page 39 of 58

Page 40

22
made to revenue for the income that might not
be collected;
• Suppliers invoices paid in the one week following
the year-end are accrued together with specific
accruals in respect of further material items
provided the goods or services were received by
the Balance Sheet date. 
C Contingent Liabilities 
Contingent liabilities are disclosed in the accounts, but
not recognised in the Balance Sheet, in circumstances
where: 
• an event has taken place that gives the
Committee a possible obligation whose existence
will only be confirmed by the occurrence or
otherwise of uncertain future events not wholly
within the control of the Joint Committee; or
• a provision would otherwise be made but either it
is not probable that an outflow of resources will
be required or the amount of the obligation
cannot be measured reliably. 
D Employee Benefits 
Benefits payable during
employment
All salaries and wages earned up to the Balance Sheet
date are included in the accounts irrespective of when
payment was made. An accrual is made for the cost of
holiday entitlements earned by employees but not
taken before the year end; and which employees may
carry forward into the next financial year. 
Post-employment benefits
The Joint Committee participates in the Local
Government Pension Scheme which is administered
by the Strathclyde Pension Fund. The Local
Government Pension Scheme is accounted for as a
defined benefit scheme, and in accordance with
International Accounting Standard 19 (IAS19) the Joint
Committee has disclosed certain information
concerning the assets, liabilities, income and
expenditure relating to the pension scheme. IAS 19
requires that an organisation must account for
retirement benefits when it is committed to giving
them, even if the payment will be many years into the
future.   
This involves the recognition in the Balance Sheet of
the Joint Committee’s share of the net pension asset
or liability in the Strathclyde Pension Fund and a
pension reserve. The Comprehensive Income and
Expenditure Statement also recognises changes
during the year in the pension asset or liability.
Service expenditure includes pension costs based on
employers' pension contributions payable and
payments to pensioners in the year. 
The liabilities of the Strathclyde Pension Fund
attributable to the Joint Committee are included in
the Balance Sheet on an actuarial basis using the
projected unit method i.e., an assessment of the
future payments that will be made in relation to
retirement benefits earned to date by employees,
based on assumptions about mortality rates,
employee turnover rates and projections of earnings
for current employees. Liabilities are discounted to
their value at current prices using a discount rate
based on the current rate of return available on a
high-quality corporate bond of equivalent currency
and term to the scheme liabilities. 
The assets of the Strathclyde Pension Fund
attributable to the Joint Committee are included in
the Balance Sheet at their fair value, principally the
bid price for quoted securities, and estimated fair
value for unquoted securities. 
E Events after the Balance
Sheet date 
Events after the Balance Sheet date are those events,
both favourable and unfavourable, that occur
between the end of the reporting period and the date
when the Statements are authorised for issue. There
are two types of events:
• Adjusting events – those that provide evidence of
conditions that existed at the end of the reporting
Page 40 of 58

Page 41

23
period, and the Statements are adjusted to reflect
such events;
• Non-adjusting events – those that are indicative
of conditions that arose after the reporting
period, and the Statements are not adjusted.
Where a category of events would have a
material effect, disclosure is made in the notes of
the nature of the event and its estimated financial
effect.
Events taking place after the date of authorisation for
issue are not reflected in the Statements. 
F Prior Period Adjustments,
Changes in Accounting
Policies and Estimates and
Errors 
Prior period adjustments may arise as a result of a
change in accounting policies or to correct a material
error. Changes in accounting estimates are accounted
for prospectively, i.e., in the current and future years
affected by the change and do not give rise to a prior
period adjustment. 
Changes in accounting policies are made only when
required by proper accounting practices, or the
change provides more reliable or relevant information
about the effect of transactions, other events and
conditions on the Committee’s financial position or
financial performance. Where a change is made, it is
applied retrospectively (unless otherwise stated) by
adjusting opening balances and comparative amounts
for the prior period as if the new policy had always
been applied. 
Material misstatement or omission discovered in prior
period figures are corrected retrospectively (unless
otherwise stated) by adjusting opening balances and
comparative amounts for the prior period. 
G Government Grants and
other Contributions 
Whether paid on account, by instalments or in
arrears, government grants and third-party
contributions and donations are recognised as due to
the Joint Committee when there is reasonable
assurance that:
• the Joint Committee will comply with the
conditions attached to the payments; and
• the grants or contributions will be received. 
Amounts recognised as due to the Joint Committee
are not credited to the Comprehensive Income and
Expenditure Statement until conditions attaching to
the grant or contribution have been satisfied. Monies
advanced as grants and contributions are carried in
the Balance Sheet as creditors. When conditions are
satisfied, the grant or contribution is credited to the
Specific Grant Income line in the CIES. 
H Non-current Assets 
Clydeplan carried out a review during 2020/21 on
plant and equipment and intangible assets and
deemed that no items currently qualify for
recognition.  Assets that are held for use in the supply
of services or other administrative purposes and are
expected to be used for more than one year are
classed as property, plant and equipment and
intangible assets. Assets costing less than £9,000 are
not treated as capital expenditure. 
I Provisions 
Provisions are made where an event has taken place
that gives the Joint Committee a legal or constructive
obligation that probably requires a settlement by a
transfer of economic benefit or service potential, and
a reliable estimate can be made of the amount of the
obligation. Provisions are charged as an expense to
the appropriate service line in the Comprehensive
Income and Expenditure Statement. When payments
are eventually made, they are charged to the
Page 41 of 58

Page 42

24
provision carried in the Balance Sheet. Estimated
settlements are reviewed at the end of each financial
year. 
J Reserves 
Reserves are classified under accounting regulations
into two categories: usable reserves, which are
available to spend; and unusable reserves, which are
unrealised net gains that have a deferred impact on
the Joint Committee. 
Usable Reserves 
The Revenue Reserve represents surplus funds held
by the Joint Committee, which are ultimately
repayable to the constituent authorities in the same
allocation proportions as the requisitions. 
Unusable Reserves 
The Pension Reserve arises from the IAS19 accounting
disclosures for retirement benefits and recognises the
Joint Committee’s share of actuarial gains and losses
in the Strathclyde Pension Fund and the change in the
Joint Committee’s share of the Pension Fund net
liability chargeable to the CIES. 
The Employee Statutory Adjustment Account absorbs
the differences that would otherwise arise on the
Revenue Reserve from accruing for compensated
absences earned, but not taken in the year, e.g.,
annual leave entitlement carried forward at 31 March
each year. 
K Value Added Tax 
Income and Expenditure excludes any amount relating
to Value Added Tax (VAT), as all VAT is payable to HM
Revenue & Customs and all VAT is recoverable from
them. 
Note 14: Assumptions made
about the future 
The Annual Accounts contain estimated figures that
are based on assumptions made by the Joint
Committee about the future or that are otherwise
uncertain. Estimates are made taking into account
historical experience, current trends and other
relevant factors. However, because balances cannot
be determined with certainty, actual results could be
materially different from the assumptions and
estimates. The items in the Balance Sheet at 31 March
2022 for which there is a significant risk of material
adjustment in the forthcoming financial year are as
follows: 
Item Uncertainties Effect if Results differ from Assumption
Pensions
Liability
Estimation of the net liability to pay pensions
depends on a number of complex judgements
relating to the discount rate used, the rate at
which salaries are projected to increase, changes
in retirement ages, mortality rates and expected
returns on pension fund assets. A firm of
consulting actuaries is engaged to provide the
Joint Committee with expert advice about the
assumptions to be applied.
The effects on the net pensions liability of changes
in individual assumptions can be measured. For
instance, a 0.1% decrease in the discount rate
assumption would result in an increase in the
pension asset of £0.095m, equating to an 2%
increase. The carrying value of the pension asset
was £0.189m as at 31 March 2022. For further
details see Note 10: Retirement Benefits.
Page 42 of 58

Page 43

25
Note 15: Green Network
Partnership 
Overview 
The Glasgow Clyde Valley Green Network Partnership
(GCVGNP) was formed in 2006 to develop a co-
ordinated approach that will deliver major
improvement in the scale and quality of green
network provision across Glasgow Clyde Valley. 
There is a strong relationship between Clydeplan and
the GCVGNP: The Strategic Development Plan
Manager and Assistant Manager are Chair and Vice-
Chair of the GCVGNP Committee respectively; the
Clydeplan Joint Committee acts for its constituent
local authorities to agree local authority funding to
support the GCVGNP Business Plan; the Clydeplan
Joint Committee approves the GCVGNP business plan
and revenue estimates, in respect of local authority
contributions only; progress against business plan
targets are monitored annually by the Joint
Committee; the executive team of Clydeplan and
GCVGNP share offices in 40 John Street, Glasgow. 
As well as the Strategic Development Plan Manager,
the GCVGNP committee is comprised of senior
employees from the eight local authorities. The
relationship between the Clydeplan and the GCVGNP
is not a joint arrangement and so outside the scope of
IFRS 11 (Joint Arrangements). 
In May 2021, the Green Network Manager retired,
and the post will not be filled. This leaves GCVGNP
with two staff members.
At its Partnership meeting on 12 May 2021, the
GCVGNP approved a change to the contribution
funding, whereby, the funding for 2021/22 and future
years will only consist of the contributions from the
eight local authorities. This is demonstrated in the
funding table that follows. 
Financial Performance 
Revenue 
GCVGNP has returned a deficit of £13k against a
budgeted breakeven, giving a net position of £13k
(2020/21 £10k).  The deficit is a result of a reduction
in income due to the eight local authorities being the
only requisitioners and also the Green Network
Manager leaving in May 2021 which was an
unbudgeted post. 
GCVGNP is a significant regional component of the
Central Scotland Green Network (CSGN). As a result,
the GCVGNP secures additional funding for various
projects related to the CSGN. The GCVGNP has been a
key partner in the study and planning of the
development of the Seven Lochs Wetland Park;
however, there was no project expenditure by the
GCVGNP in either 2021/22 or 2020/21. 
Reserves 
The Partnership retains financial reserves to offset any
liabilities of the Partnership. The following table
shows the value of the Partnerships reserves at 31
March 2022. This is analysed into Usable reserves,
which is derived from partnership funding and can be 
used to fund expenditure, and Unusable reserves,
which cannot be used to fund expenditure. 
2020/21 Reserves 2021/22
£ £
(113,306) Usable Reserves (99,630)
Unusable Reserves:
3,109 Employee Statutory Adjustment
Account
173
312,000 Pension Reserve 114,000
201,803 Total 14,543 
Budget 2022/23 
The GNP’s 2022/23 budget was approved by the
ClydePlan Joint Committee on 13 December 2021. 
Page 43 of 58

Page 44

26
The GCVGNP partners have contributed funding in the following proportions to enable it to carry out its objectives: 
2020/21 2021/22
£ Council % £
5,756 East Dunbartonshire 6.0% 5,756
4,900 East Renfrewshire 5.1% 4,900
31,949 Glasgow City 33.2% 31,949
4,451 Inverclyde 4.6% 4,451
17,825 North Lanarkshire 18.5% 17,825
9,311 Renfrewshire 9.7% 9,311
16,992 South Lanarkshire 17.7% 16,992
5,001 West Dunbartonshire 5.2% 5,001
Third Party
33,619 Scottish National Heritage 0.0% 0
32,276 Scottish Forestry 0.0% 0
7,210 Glasgow Centre for Population Health 0.0% 0
4,809 Scottish Environmental Protection Agency 0.0% 0
18,737 Central Scotland Green Network 0.0% 0
7,000 NHS Health Scotland 0.0% 0
199,836 Total Green Network Partnership Funding 100.0% 96,185 
Page 44 of 58

Page 45

GLASGOW AND THE CLYDE VALLEY STRATEGIC DEVELOPMENT PLANNING
AUTHORITY JOINT COMMITTEE      
To:  Joint Committee 
On:  27 June 2022
___________________________________________________________________ 
Report by:  Chief Auditor 
___________________________________________________________________ 
Heading:  Internal Audit Annual Report 2021/22
___________________________________________________________________ 
1. SUMMARY 
1.1 The Public Sector Internal Audit Standards require the Chief Auditor to prepare a
report, at least annually, to senior management and the Board on the internal audit
activity’s purpose, authority, and responsibility, as well as performance relative to
its plan. 
1.2 The annual report must also provide an annual audit opinion on the overall
adequacy and effectiveness of the Glasgow and Clyde Valley Strategic
Development Planning Authority’s internal control environment. 
1.3 The Annual Report for Glasgow and Clyde Valley Strategic Development Planning
Authority is attached at Appendix 1 and outlines the role of Internal Audit, the
performance of the Internal Audit Team, the main findings from the internal audit
work undertaken in 2021/22 and contains an audit assurance statement.   
2. RECOMMENDATIONS 
2.1 Members are invited to consider and note the contents of the Annual Report.   
Item 7
Page 45 of 58

Page 46

Page 46 of 58

Page 47

Glasgow and Clyde Valley Strategic
Development Planning Authority 
Annual Report 
2021-2022 
Renfrewshire Council
Internal Audit 
June 2022 
Page 47 of 58

Page 48

Page 48 of 58

Page 49

Glasgow and Clyde Valley Strategic Development Planning Authority 
Internal Audit Annual Report 2021/2022 
Contents 
Page 
1.    Introduction  1
2. Responsibilities of Management and Internal Audit 2 
3.    Internal Audit Activity in 2021/22  2 
4.    Internal Audit Performance    3 
5.  Planned Audit Work for 2022/23  4 
6.  Audit Assurance Statement  4 
Page 49 of 58

Page 50

Page 50 of 58

Page 51

- 1 -
Glasgow and Clyde Valley Strategic Development Planning Authority 
Internal Audit Annual Report   
1 April 2021 – 31 March 2022 
1. Introduction 
1.1 As host Authority, Renfrewshire Council provides an internal audit service to
Glasgow and Clyde Valley Strategic Development Planning Authority.  This
includes: 
 The compilation of an annual audit plan following consideration 
and evaluation of those areas of greatest risk in the organisation’s
operation, and consultation with the Strategic Development Plan
Manager;
 Delivery of the planned audit assignments;
 Follow up of previous audit recommendations;
 Provision of any ongoing advice and support on audit and risk
management related matters;
 Provision of an Annual Report and Assurance Statement, and
presentation to elected members at the Glasgow and Clyde Valley
Strategic Development Planning Authority. 
1.2 The Service operates in accordance with the Public Sector Internal Audit
Standards which defines Internal Audit’s role as: 
“......an independent, objective assurance and consulting activity designed to
add value and improve an organisation’s operations. It helps an organisation
accomplish its objectives by bringing a systematic, disciplined approach to
evaluate and improve the effectiveness of risk management, control and
governance processes.” 
1.3 In line with the Standards, the purpose of this Annual Report is to report on: 
 The outcome of any planned Internal Audit reviews in 2021/22 relating
to the Glasgow and the Clyde Valley Strategic Development Planning
Authority;
 The outcome of Internal Audit reviews of supporting Renfrewshire
Council corporate systems;
 Internal audit performance; 
 Planned audit work for 2022/23;
 The annual assurance statement which provides an opinion on the
overall adequacy and effectiveness of the Planning Authority’s internal
control environment. 
Page 51 of 58

Page 52

- 2 -
2. Responsibilities of Management and Internal Audit 
2.1 It is the responsibility of management to ensure that the areas under their
control are adequate and effective and that there is a sound system of internal
control which facilitates the effective exercise of the organisation’s functions
and which includes arrangements for the management of risk. 
2.2 Internal Audit is not a substitute for effective control exercised by
management as part of their responsibilities. Internal Audit’s role is to
independently assess the adequacy of the risk management, internal controls
and governance arrangements put in place by management and to undertake
sufficient work to evaluate and conclude on the adequacy of those controls for
the period under review. 
3. Internal Audit Activity during 2021/2022 
3.1 The Annual Report for 2020/2021 was submitted to the Joint Board on 14
June 2021. 
3.2 There were no outstanding audit recommendations which required to be
followed up as part of the 2021/22 annual follow up exercise. 
3.3 Internal Audit also conduct reviews of the main corporate systems operating
within Renfrewshire Council which support the Committee’s activity. The main
findings in relation to these are summarised in Table 1 below and
Renfrewshire Council management have agreed to implement the audit
recommendations made in relation to each review:
Table 1 
Audit Area Conclusion
Payroll - Overpayments • Reasonable Assurance 
 Although there is a Salary Adjustment
Policy in place, recovery action does
not always strictly comply with the
policy and recommendations were
made to strengthen controls in this
area.  
 There are satisfactory arrangements
in place to ensure that employees
and managers are aware of their
responsibilities in relation to payroll
processing and salary overpayments.
 The introduction of monthly
overpayment reports to services to
inform them of employee
overpayments has enabled services
to address any issues that may lead
to further overpayments. A dedicated
team within the Council has been
established to concentrate on
Page 52 of 58

Page 53

- 3 -
overpayment recoveries.
Supporting Attendance • Reasonable Assurance 
 The audit review identified that, the
level of sickness absence monitoring
in place was found to be adequate
and that management are provided
with adequate information to ensure
that the supporting attendance policy
is being followed. 
Budgetary Controls • Substantial Assurance 
 The audit identified that there were
clear budgetary control roles and
responsibilities for accounting staff
and budget holders. Budget holders
get the information they need from
accounting staff.
 The main findings from the review
were in relation to having formal
procedures i.e. an updated Budget
Holders Manual and council specific
budget monitoring procedures for
accountants. 
4. Review of Internal Audit Performance 
4.1 Internal Audit produces regular reports on its performance during the year to
the Renfrewshire Council, Audit, Risk and Scrutiny Board, against a range of
measures set annually by the Director of Finance and Resources. These
targets are set for all internal audit engagements and include Renfrewshire
Council and other associated bodies, for which the team provides internal
audit services. Table 2 shows the actual performance against targeted
performance for the year.
Table 2 
Internal Audit Performance 2021/22 
Performance measure  Target 2021/22 Actual 2021/22
% of audit assignments         
completed by target date
95% 98.4%
% of audit assignments completed
within time budget
95% 96.8%
% completion of audit plan for the
year*
95% 92.1%
* this measures the completion percentage as at 31 March.  100% of the plan is ultimately delivered through the
finalisation of the outstanding elements in the new financial year.  
Page 53 of 58

Page 54

- 4 -
4.2 The percentage completion of the revised audit plan is slightly below the
target set for the year.  This was due, in the main, to a higher than anticipated
level of unplanned absence. It should be noted that the planned internal audit
activity within the planning authority is 100% complete. The actual
performance for the year for the two other indicators, is above the target
performance level. 
4.3 The Chief Auditor is required to develop and maintain a quality assurance and
improvement programme that covers all aspects of internal audit including
conformance with the PSIAS. The review did not identify any areas of non-
conformance that require to be addressed. 
4.4 External Audit 
External Audit’s review of the internal audit service concluded that overall the
service operates in accordance with the PSIAS. 
4.5 Risk Management 
The internal audit service through the Risk Manager, provides advice and
support to the GCVSDPA officers, as required. 
5. Planned Work for 2022/23 
5.1 Following a risk based assessment of the activities of the Glasgow and Clyde
Valley Strategic Development Planning Authority and consultation with the
Strategic Development Plan Manager the following internal audit work has
been agreed for 2022/23: 
 A review of the governance arrangements in place;
 Ad-hoc internal audit and risk management advice;
 Follow-up of previous audits. 
6. Audit Assurance Statement 
6.1 Internal Audit has performed its work in accordance with the role defined in
paragraph 1.2.  The audit work performed has been reported to the Strategic
Development Plan Manager, and to the Joint Committee in this annual report.
Where areas for improvement in internal control have been identified,
appropriate recommendations have been made and accepted for action by
management.   
6.2 In view of the continued challenges common to all public bodies, there will be
a requirement for the council and the bodies for which it is host authority to
exercise very close scrutiny over expenditure, and both areas will continue to
receive due internal audit attention.  
6.3 It is not feasible for the system of internal control to be without any weakness. 
It is important to balance the risks involved in accepting systems limitations
Page 54 of 58

Page 55

- 5 -
with the consequences if a problem emerges. Internal Audit recognises this
and assesses this in its reporting mechanism.   
6.4 The audit plan is always intended to be flexible and contingency time was
utilised to undertake additional work on areas of emerging risk.   Additionally,
the gross operational internal audit days were reduced by 14% in 2021/22
overall due to unplanned absence and no audit engagements were
outsourced as was planned due to the pandemic. In this context, it is
considered that a reasonable level of assurance can be placed upon the
adequacy and effectiveness of the Glasgow and Clyde Valley Strategic
Development Planning Authority’s internal control, risk management and
governance arrangements, as evidenced by:-  
 The results of the audit work in 2021/22 in relation to the corporate
systems which supported the Glasgow and Clyde Valley Strategic
Development Planning Authority’s activities. 
 Management action in response to audit recommendations. 
 Management self assessment of internal control, risk management and
governance arrangements. 
 The regular review and updating of the Local Code of Corporate
Governance by the Council in accordance with the CIPFA/SOLACE
framework for corporate governance requirements and of the corporate
governance arrangements within the Glasgow and Clyde Valley
Strategic Development Planning Authority. 
Signed   
Asst. Chief Auditor     
Date          17 June 2022       
Page 55 of 58

Page 56

Page 56 of 58

Page 57

To: Glasgow and the Clyde Valley Strategic Development Planning Authority Joint
Committee 
On: 27 June 2022 
Report by
Clerk 
Timetable of Meetings 2022 to 2027 
1. Summary 
1.1 Meetings of the Joint Committee are convened on a quarterly basis with
meetings being held at 11.15 am on Mondays in March, June, September and
December each year.   
1.2 Arrangements for ordinary meetings of the Joint Committee are governed by the
provisions of Standing Order 5 of the Joint Committee’s Procedural Standing
Orders which state that:- 
“The Joint Committee shall meet from time to time as determined by the Joint
Committee but shall meet not less than four times in each calendar year. The
dates, times and places for ordinary meetings of the Joint Committee shall be
decided by the Joint Committee.” 
1.3 To allow the business of the Joint Committee to continue during the coronavirus
pandemic, the Joint Committee met remotely from March 2020, latterly using 
MS Teams.
1.4 The suggested dates for meetings of the Joint Committee for the current five-
year term from 2022 to 2027 are:
12 September and 12 December 2022
13 March, 12 June, 11 September and 11 December 2023
11 March, 10 June, 9 September and 9 December 2024
10 March, 9 June, 8 September and 8 December 2025
9 March, 8 June, 7 September and 7 December 2026
8 March and 14 June 2027. 
Item 8
Page 57 of 58

Page 58

1.5 In terms of the venue for meetings, it is proposed that the Joint Committee
consider the future arrangements for meeting and whether meetings should
continue to be held remotely using MS Teams. 
2. Recommendations 
2.1 That the timetable of meetings be approved; and 
2.2 That the Joint Committee consider the future arrangements for meetings and
whether meetings should continue to be held remotely using MS Teams. 
Author: Elaine Currie, Senior Committee Services Officer
elaine.currie@renfrewshire.gov.uk
0141 618 7111
Page 58 of 58