Page 1

04/09/2023 
Notice of Meeting and Agenda
Glasgow & the Clyde Valley Strategic Development
Planning Authority Joint Committee. 
Date  Time Venue
Monday, 11 September
2023
11:15 Remotely by MS Teams, 
Membership
Councillor Lawrence O’Neill (Convener); Councillor David Wilson (Vice-Convener). 
Councillor Jim Gibbons and Councillor Alan Moir (East Dunbartonshire Council); Councillor Paul
Edlin and Councillor Colm Merrick (East Renfrewshire Council); Councillor Kenny McLean and
Councillor Ken Andrew (Glasgow City Council); Councillor Chris Curley (Inverclyde Council);
Councillor Tom Fisher and Councillor Allan Stubbs (North Lanarkshire Council); Councillor John
McNaughtan and Councillor Jim Paterson (Renfrewshire Council); Councillor Richard Nelson
and Councillor Robert Brown (South Lanarkshire Council); and Councillor Gurpreet Singh Johal
(West Dunbartonshire Council).   
Further Information - online meetings only
This meeting is on-line only but is a meeting which is open to members of the public by prior
arrangement. A copy of the agenda and reports for this meeting will be available for inspection
prior to the meeting at the Customer Service Centre, Renfrewshire House, Cotton Street, Paisley
and online at http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx 
For further information, please email democratic-services@renfrewshire.gov.uk
MARK CONAGHAN
Clerk 
Page 1 of 20

Page 2

04/09/2023 
Members of the Press and Public - contact details
Members of the press and public wishing to attend the meeting should contact democratic-
services@renfrewshire.gov.uk to allow the necessary arrangements to be made.    
Page 2 of 20

Page 3

04/09/2023
Items of business      
Apologies
Apologies from members. 
Declarations of Interest and Transparency Statements
Members are asked to declare an interest or make a transparency
statement in any item(s) on the agenda and to provide a brief
explanation of the nature of the interest or the transparency statement. 
1 Minutes
Minute of meeting of the Joint Committee held on 12 June 2023 and
Minute of special meeting of the Joint Committee held on 28 June 2023. 
5 - 14 
2 Audited Annual Accounts 2022/23
Report by Treasurer. (cover report only - appendices to follow) 
15 - 16 
3 Revenue Budget Monitoring
Report by Treasurer. 
17 - 18 
4 Resourcing Delivery of the Green Network 'Blueprint'
Report by Development Officer. 
19 - 20 
5 The next steps towards a Regional Spatial Strategy
Verbal report by Kevin Rush, Director of Regional Economic Growth,
Glasgow City Region. 
6 Date of Next Meeting
Note that the next meeting of the Joint Committee will be held at 11.15
am on 11 December 2023. 
Page 3 of 20

Page 4

Page 4 of 20

Page 5

Minute of Meeting
Glasgow & the Clyde Valley Strategic Development
Planning Authority Joint Committee. 
Date Time Venue
Monday, 12 June 2023 11:15 Remotely by MS Teams, 
Present
Councillor Jim Gibbons and Councillor Alan Moir (East Dunbartonshire Council); Councillor
Paul Edlin (East Renfrewshire Council); Councillor Kenny McLean and Councillor Ken
Andrew (Glasgow City Council); Councillor David Wilson (Inverclyde Council); Councillor
Tom Fisher and Councillor Allan Stubbs (North Lanarkshire Council); Councillor John
McNaughtan and Councillor Jim Paterson (Renfrewshire Council); Councillor Robert Brown
(South Lanarkshire Council); and Councillor Lawrence O’Neill and Councillor Gurpreet
Singh Johal (West Dunbartonshire Council).     
Chair
Councillor O’Neill, Convener, presided.     
In Attendance
H Holland, Executive Officer - Land Planning & Development (East Dunbartonshire
Council); J Nicol, Planning & Building Standards Manager (East Renfrewshire Council); S
Shaw, Head of Planning (Glasgow City Council); S Jamieson, Head of Regeneration and
Planning (Inverclyde Council); L Bowden, Planning & Place Manager (North Lanarkshire
Council); M Conaghan, Clerk (for item 1 only), A Morrison, Head of Economy &
Development Services, C McCourt, Head of Finance & Procurement, K Campbell, Assistant
Chief Auditor, D Love, Chief Planning Officer, A Burns, Corporate Finance Team Manager,
T McGowan, Senior Accountancy Assistant and E Currie, Senior Committee Services
Officer (all Renfrewshire Council); F Carlin, Head of Planning & Regulatory Services and T
Finn, Planning & Building Standards Manager (both South Lanarkshire Council) and P
Clifford, Planning & Building Services Manager (West Dunbartonshire Council).      
Item 1
Page 5 of 20

Page 6

Apologies
Councillor Colm Merrick (East Renfrewshire Council) and Councillor Richard Nelson
(South Lanarkshire Council).      
Declarations of Interest
There were no declarations of interest intimated prior to the commencement of the
meeting.      
Order of Business
In terms of Standing Order 12, the Convener intimated that he proposed to alter the
order of business to facilitate the conduct of the meeting by considering item 5 of the
agenda before item 1 of the agenda.     
1 Glasgow and The Clyde Valley Strategic Development Planning
Authority Joint Committee - Towards a Regional Spatial Strategy
Under reference to item 6 of the Minute of the meeting of this Joint Committee held on
13 March 2023, there was submitted a report by the Clydeplan Steering Group outlining
potential options for the management and governance arrangements for the duty to
prepare a Regional Spatial Strategy (RSS) and seeking the views of the Joint
Committee on the preferred model for implementation. The report also dealt with the
requisite cessation of the Joint Committee due to the recent changes in planning
legislation enacted by the Scottish Parliament. 
The report provided the background in relation to NPF4 and the introduction of RSSs
which, unlike the Clydeplan, would not form part of the statutory development plan, this
would now comprise NPF4 and individual authorities’ local development plans (LDPs).
RSSs would feed into the planning process by guiding the preparation of relevant LDPs
and future iterations of NPF. 
The report intimated that, given these changes, the role and remit for which the Joint
Committee had been originally established would significantly change. A copy of the
Minute of Agreement was appended to the report. 
The report advised that there was no prescription in The Planning (Scotland) Act 2019
on how local authorities discharged the duty to prepare a RSS and it was open for local
authorities to consider their preferred model. The RSS would not be a statutory
document and it was not clear what, if any, role a regional body like the Joint Committee
would have in approving its content. Guidance on the preparation of RSSs was pending,
however the Scottish Government were yet to confirm the timescale and this was an
appropriate juncture to examine the future governance of joint working on regional
planning matters and to seek the settled view of the Joint Committee. 
Page 6 of 20

Page 7

The report set out three proposed options for the Joint Committee in terms of a
proposed way forward with the preparation and governance of the forthcoming RSS;
provided detail in relation to staffing and funding; and the next steps. 
Alasdair Morrison, Lead Officer advised that recommendation (b) of the report should
be amended to now read ‘(b) notes the cessation of Strategic Development Plans and
the resultant implications for the Joint Committee’. 
Following discussion, the Convener proposed that consideration of this report be
continued to a special meeting of the Joint Committee to be held remotely on MS teams
in the week commencing 26 June 2023 and that members be advised of the date and
time of the special meeting when known. This was agreed unanimously. 
DECIDED: That consideration of this report be continued to a special meeting of the
Joint Committee to be held remotely on MS teams in the week commencing 26 June
2023 and that members be advised of the date and time of the special meeting when
known.   
2 Minute
There was submitted the Minute of the meeting of this Joint Committee held on 13
March 2022. 
DECIDED: That the Minute be approved.   
3 Unaudited Annual Accounts 2022/23
There was submitted a report by the Treasurer relative to the unaudited annual
accounts for 2022/23, a copy of which was appended to the report. 
The report intimated that the accounts for the year ended 31 March 2023 would be
submitted to Azets in advance of the statutory deadline of 30 June 2023. It was noted
that the Joint Committee had returned a surplus of £75,163 for the financial year
resulting in an underspend of £105,163 against the planned deficit of £30,000. 
The report advised that the management commentary within the accounts provided an
overview of the Joint Committee’s financial performance during 2022/23 and its outlook
for the future. 
The report further advised that The Local Authority Accounts (Scotland) Regulations
2014 required the Joint Committee to prepare and publish a set of accounts, including
an Annual Governance Statement, by 30 June each year. The unaudited accounts were
then required to be formally considered by the Joint Committee with the Annual
Governance Statement being formally approved at this time. Once considered, the
accounts would be subject to external audit by Azets by 30 September 2023 and the
report advised that the 2022/23 audited Annual Accounts would be submitted to the
meeting of the Joint Committee scheduled to be held on 11 September 2023 for
approval and signing by the Convener, the Lead Officer and the Treasurer, in
accordance with the regulations. 
DECIDED: 
Page 7 of 20

Page 8

(a) That the unaudited Annual Accounts for 2022/23 be noted; 
(b) That the Annual Governance Statement be approved; and 
(c) That the final budget position for 2022/23 be noted.   
4 Internal Audit Engagement - Governance Arrangements
There was submitted a report by the Chief Auditor relative to the audit of the Joint
Committee’s governance arrangements. 
The report intimated that in line with the Public Sector Internal Audit Standards, Internal
Audit must communicate the results of each engagement to the Joint Committee. It was
noted that the Chief Auditor would submit summary reports of completed audit
engagements to the Joint Committee on the conclusion of each engagement for formal
consideration by members in line with best practice. 
The summary for the internal audit review of governance arrangements, completed in
December 2022, was appended to the report and detailed the overall assurance rating
and the number of recommendations in each risk category. 
DECIDED: That the summary for the internal audit review of the Joint Committee’s
governance arrangements, appended to the report, be noted.   
5 Internal Audit Annual Report 2022/23
There was submitted a report by the Chief Auditor relative to the Internal Audit Annual
Report on the Glasgow and the Clyde Valley Strategic Development Planning Authority
for 2022/23.  
The report intimated that the Public Sector Internal Audit Standards required that the
Chief Auditor prepare an annual report on the internal audit activity’s purpose, authority
and responsibility, as well as performance relative to its plan. The report also required
to provide an audit opinion on the overall adequacy and effectiveness of the internal
control system of the audited body. 
The Annual Report for the Joint Committee was attached as an appendix to the report
and outlined the role of internal audit, the performance of the internal audit team and
the main findings from the internal audit work undertaken in 2022/23 and contained an
audit assurance statement. 
The Assistant Chief Auditor advised that, in relation to paragraph 4.1 of the Annual
Report, the percentage of audit assignments completed by target date in the last
column should read 98% and not 93% as stated, and that the percentage completion
of audit plan for the year should read 93% and not 98% as stated. 
DECIDED: That, subject to the above amendments, the Internal Audit Annual Report
for 2022/23 be noted.   
Page 8 of 20

Page 9

6  Date of Next Meeting
DECIDED: 
(a) That it be noted that a special meeting of the Joint Committee would be held
remotely on MS teams in the week commencing 26 June 2023 and that members be
advised of the date and time of the special meeting when known; and 
(b) That it be noted that the next scheduled meeting of the Joint Committee would be
held at 11.15 am on 11 September 2023 and that members be advised if this meeting
would be held remotely using MS teams or would be an ‘in person’ meeting. 
Page 9 of 20

Page 10

Page 10 of 20

Page 11

Minute of Special Meeting
Glasgow & the Clyde Valley Strategic Development
Planning Authority Joint Committee. 
Date Time Venue
Wednesday, 28 June 2023 09:00 Remotely by MS teams, 
Present
Councillor Jim Gibbons (East Dunbartonshire Council); Councillor Paul Edlin and Councillor
Colm Merrick (East Renfrewshire Council); Councillor Kenny McLean and Councillor Ken
Andrew (Glasgow City Council); Councillor David Wilson (Inverclyde Council); Councillor
Tom Fisher and Councillor Allan Stubbs (North Lanarkshire Council); Councillor John
McNaughtan (Renfrewshire Council); Councillor Robert Brown (South Lanarkshire Council);
and Councillor Lawrence O’Neill and Councillor Gurpreet Singh Johal (West Dunbartonshire
Council).     
Chair
Councillor O’Neill, Convener, presided.     
In Attendance
H Holland, Executive Officer - Land Planning & Development (East Dunbartonshire
Council); J Nicol, Planning & Building Standards Manager (East Renfrewshire Council); L
Bowden, Planning & Place Manager (North Lanarkshire Council); M Conaghan (Clerk), A
Morrison, Head of Economy & Development Services, C McCourt, Head of Finance &
Procurement, D Love, Chief Planning Officer, A Burns, Corporate Finance Team Manager,
D Low, Democratic Services Manager, P Shiach, Senior Committee Services Officer, T
McGowan, Senior Accountancy Assistant and D Pole, End User Technician (all
Renfrewshire Council); F Carlin, Head of Planning & Regulatory Services (South
Lanarkshire Council); S Taylor, Principal Planner (Glasgow City Council); and A Williamson,
Development Planning and Place Team Leader (West Dunbartonshire Council).      
Page 11 of 20

Page 12

Apology
Councillor Moir (East Dunbartonshire Council).  
Declarations of Interest
There were no declarations of interest intimated prior to the commencement of the
meeting. 
1 Glasgow and The Clyde Valley Strategic Development Planning
Authority Joint Committee - Towards a Regional Spatial Strategy
Under reference to item 1 of the Minute of the meeting of this Joint Committee held on
12 June 2023, there was submitted a report by the Clydeplan Steering Group outlining
potential options for the management and governance arrangements for the duty to
prepare a Regional Spatial Strategy (RSS) and seeking the views of the Joint
Committee on the preferred model for implementation. The report also dealt with the
potential cessation of the Joint Committee due to the recent changes in planning
legislation enacted by the Scottish Parliament. 
The report provided the background in relation to National Planning Framework (NPF4)
and the introduction of RSSs which, unlike the Clydeplan, would not form part of the
statutory development plan, this would now comprise NPF4 and individual authorities’
local development plans (LDPs). RSSs would feed into the planning process by guiding
the preparation of relevant LDPs and future iterations of NPF. 
The report intimated that, given these changes, the role and remit for which the Joint
Committee had been originally established would significantly change. A copy of the
Minute of Agreement formed Appendix 1 to the report. 
The report advised that there was no prescription in the Planning (Scotland) Act 2019
on how local authorities discharged the duty to prepare an RSS and it was open for
local authorities to consider their preferred model. The RSS would not be a statutory
document and it was not clear what, if any, role a regional body like the Joint Committee
would have in approving its content. Guidance on the preparation of RSSs was pending,
however the Scottish Government were yet to confirm the timescale. 
Appendix 2 to the report set out four proposed options for the Joint Committee in terms
of a proposed way forward with the preparation and governance of the forthcoming
RSS; and the report provided detail in relation to staffing and funding; and the next
steps. 
Councillor O’Neill, seconded by Councillor Wilson, moved that the contents of the report
be noted; that the cessation of strategic development plans be noted; and that the
preferred option for considering regional spatial strategy planning issues going forward
be as detailed in option 1(b) which stated that ‘the Clydeplan staff team would be
integrated into the existing city region Programme Management Office (overseen by
the Director of Regional Economic Growth) who would take responsibility for preparing
an RSS and reporting this through to the Joint Committee for approval’. 
Page 12 of 20

Page 13

Councillor Stubbs, seconded by Councillor Brown, moved as an amendment that the
contents of the report be noted; that the cessation of strategic development plans be
noted; and that the preferred option for considering regional spatial strategy planning
issues going forward be as detailed in option 1 which stated ‘existing Clydeplan staff
resource would be reviewed in light of the new requirements for RSS preparation. Staff
would be consulted on a possible TUPE transfer to Glasgow City Council. If transferred,
the team would be integrated into the existing city region structures (overseen by the
Regional Director) who would take responsibility for preparing an RSS and reporting
this through to the GCR Cabinet for approval. This would move the duty to prepare an
RSS directly into the city region governance structures’.   
On the roll being called, the following members voted for the amendment: Councillors
Gibbons, Edlin, Merrick, McLean, Andrew, Fisher, Stubbs and Brown. 
The following members voted for the motion: Councillors Wilson, McNaughtan, O’Neill
and Johal. 
8 members having voted for the amendment and 4 members having voted for the
motion, the amendment was accordingly declared carried. 
DECIDED: 
(a) That the contents of the report be noted; 
(b) That the cessation of strategic development plans be noted; and 
(c) That the preferred option for considering regional spatial strategy planning issues
going forward be that existing Clydeplan staff resource be reviewed in light of the new
requirements for RSS preparation. Staff would be consulted on a possible TUPE
transfer to Glasgow City Council. If transferred, the team would be integrated into the
existing city region structures (overseen by the Regional Director) who would take
responsibility for preparing an RSS and reporting this through to the GCR Cabinet for
approval. This would move the duty to prepare an RSS directly into the city region
governance structures.   
Page 13 of 20

Page 14

Page 14 of 20

Page 15

GLASGOW AND THE CLYDE VALLEY STRATEGIC DEVELOPMENT PLANNING
AUTHORITY JOINT COMMITTEE
___________________________________________________________________ 
To: Joint Committee 
On: 11 September 2023
___________________________________________________________________ 
Report by: Treasurer
___________________________________________________________________ 
Heading: Audited Annual Accounts 2022/23
___________________________________________________________________
1. Summary
1.1 The unaudited Annual Accounts for 2022/23 were presented to the Joint
Committee on 12 June 2023 and submitted for audit by the statutory deadline
of 30 June 2023. 
1.2 The Local Authority Accounts (Scotland) Regulations 2014 require the audited
accounts to be approved for signature no later than 30 September each year. 
1.3 Section 10 of the 2014 regulations requires the Joint Committee to consider
any report made by the appointed auditor before deciding whether to sign the
audited accounts. The findings of the appointed auditor, Azets, are presented
in the Annual Audit Report, which can be found at Appendix 1. 
1.4 There are audit adjustments relating to a misstatement of interest receivable,
now reclassified as Other Income (£3k); and an adjustment to pension figures,
following receipt of revised actuarial reports (£36k).   
1.5     Following approval, the audited accounts will be submitted to the Convener,
Treasurer and the Head of Economy and Development for secure digital
signature.
___________________________________________________________________ 
2. Recommendations
2.1 It is recommended that members: 
(a) Note the findings of the 2022/23 audit as contained in the Annual Audit
Report (Appendix 1); and
(b) Approve the 2022/23 Audited Annual Accounts (Appendix 2) for signature. 
Item 2
Page 15 of 20

Page 16

Page 16 of 20

Page 17

GLASGOW AND THE CLYDE VALLEY STRATEGIC DEVELOPMENT PLANNING
AUTHORITY JOINT COMMITTEE 
To: Joint Committee
On: 11 September 2023
___________________________________________________________________
Report by: The Treasurer 
___________________________________________________________________
Heading: Revenue Budget Monitoring Report to 18 August 2023
___________________________________________________________________
1. Summary 
1.1 The forecast position for Clydeplan by 31 March 2024 is a projected
underspend of £73k, as explained in section 4.  
______________________________________________________________ 
2 Recommendations 
2.1 It is recommended that Members consider the report.
_____________________________________________________
3 Budget Adjustments   
3.1 There have been no budget adjustments since the start of the financial year.
________________________________________________________________
4 Budget Performance 
4.1 Projected Year-end Position £73k (favourable) 
Previously Reported            N/A 
The revenue budget monitoring appendix below shows a projected underspend in
Employee Costs of £133k. While an estimated pay award of 6% has been factored
into the forecast, this is offset by vacancies that have not yet been filled, including
two Strategic Planner posts and two management posts. This forecast underspend is
partially offset by overspends in Supplies and Services, mainly due to an increase in
audit fees and computer maintenance costs; and Transfer Payments, relating to the
funding of a Green Network Partnership Development Officer post, previously
approved by the Joint Committee.  
___________________________________________________________________
Item 3
Page 17 of 20

Page 18

Core Operations Approved
Budget Full Year Actual Projected Full
Year Actual
Budget Variance
£000s £000s £000s £000s
Employee Costs 493 84 360 133
Property Costs 20 1 20 (0)
Transport Costs 1 0 1 0
Supplies and Services 27 3 38 (10)
Transfer Payments 2 0 49 (48)
Support Costs 24 2 25 (2)
Gross Expenditure 567 91 494 73
Council Requisitions (544) 0 (544) 0
Other Income (3) 0 (3) 0
Gross Income (547) 0 (547) 0
TRANSFER (TO)/FROM RESERVES 20 91 (53) 73
Summary of in-year Movement in Reserves £000s
Opening Revenue Reserve at 1 April 2023 (389)
Budgeted Draw on Reserves 20
Projected Year-end variance (73)
Closing Revenue Reserve at 31 March 2024 (443)
% of Operating Income 80.9%
Employee Costs: Includes direct employee costs such as salary costs, overtime and indirect employee costs such as training, recruitment advertising
Property Costs: Includes expenses directly related to the running of premises and land, eg rates, rents and leases, utilities, contract cleaning
Transport Costs: Includes all costs associated with the provision, hire or use of transport, including travelling allowances, taxi and car hire costs and staff mileage
Supplies and Services: Includes all supplies and service expenses, such as ICT costs, and administrative costs such as stationery, postages, printing and advertising
Transfer Payments: Includes costs of payments for which no good or services are received in return e.g. Apprenticeship Levy
Support Costs: Includes central support charges e.g. Renfrewshire Council SLA and telephony recharges ('Administration Costs' in approved budget)
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2023/24
1st April 2023 - 18 August 2023
JOINT COMMITTEE - GLASGOW & CLYDE VALLEY STRATEGIC DEVELOPMENT PLANNING AUTHORITY
Page 18 of 20

Page 19

Glasgow and the Clyde Valley Strategic Development Planning Authority 
To: Glasgow and the Clyde Valley Strategic Development Planning Authority
Joint Committee    
On:  12th September 2023 
Report by
Ally Corbett, Development Officer
Resourcing Delivery of the Green Network ‘Blueprint’ 
1.  Introduction
1.1  This report is for the Joint Committee to consider the resources required for
delivery of the Green Network ‘Blueprint’, to produce a Regional Spatial Strategy
and provide support to partners. 
2. Recommendation
2.1 It is recommended that the Joint Committee extend the Green Network
Development Officer fixed term contract, which currently ends on 31st March 2024,
for a maximum of one year, or until such times as Clydeplan and Green Network
staff transition to Glasgow City Region PMO. 
3. Background
3.1 The Joint Committee at its meeting held on 13th September 2021 approved use of
£95,000 from Clydeplan Useable Revenue Reserves to fund a two year fixed term
Green Network Development Officer post to support delivery of the Green Network
Blueprint. This was in recognition of the scale of the task and the loss of the Green
Network Programme Manager post and the impact this had on capacity.
3.2 The officer was appointed in April 2022 restoring the Green Network team staffing
level to 2.6 FTE, having a significant impact on the team’s ability to drive forward
delivery of the Blueprint, and to support partners respond to the requirements of
NPF4.   
3.3 The fixed term contract will end in March 2024 and, with uncertainty over a staff
transition to Glasgow City Region PMO, the potential exists for the officer to seek
more security elsewhere, with a resultant loss in capacity and the skills developed
over the last 18 months. 
Item 4
Page 19 of 20

Page 20

4. Progress to date and future work
41. The Development Officer has responsibility for leading on two elements of the
Blueprint, grassland and wetland nature networks. Significant progress has been
made on moving these workstreams forward including: developing partnerships of
local authorities, agencies and NGOs with the skills and expertise to oversee and
guide both workstreams; securing funding through the Nature Restoration Fund for
work to inform targeted delivery; and project managing that work successfully to
completion.  The work outlined above will also play a central role in identifying
“Nature Networks”, a new requirement for local authorities through NPF4.
4.2  The officer is now working with each of the eight GCR local authorities to identify
a programme of delivery projects with the intention of applying to the Nature
Restoration Fund in Spring 2024 for funding upwards of £250k. 
4.4 The grassland and wetland initiatives have benefited enormously from having a
dedicated resource to drive them forward and are now at a critical point in the
transition from development to delivery.  The next six months to a year will be
crucial in that transition.
4.5 More generally, the Green Network team will have a key role in developing the
environmental aspects of the Regional Spatial Strategy and in supporting the eight
GCR authorities meet the suite of new requirements set out in NPF4, the LDP
Guidance and for Open Space Strategies and Play Sufficiency Assessments. This
will be a significant workstream for the team and likely to extend over the next two
to three years. 
5. Proposal 
5.1 To support ‘Blueprint’ delivery, development of the Regional Spatial Strategy and
partners in meeting the requirements of NPF4, it is proposed to utilise circa
£47,000 of the Useable Revenue Reserves held by Clydeplan to extend the Green
Network Development Officer fixed term post until 31st March 2024.  Clydeplan
Reserves are currently estimated at £220,000. 
5.2 If the transition to the GCR PMO happens within that timeframe, then only a
proportion or none of that sum would be required.
Page 20 of 20