Democracy Spraffa

Oban Baptist Church: Demolition of Existing Buildings and Erection of New Church/Community Building with Associated Landscaping Works: Oban Baptist Church, Albany Street, Oban (Ref: 23/00688/Pp)

Argyll and Bute Council · 22 November 2023
Back to Planning, Protective Services and Licensing Committee — 22 November 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of
the Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 23/00688/PP
Planning
Hierarchy:
Local 
Applicant: Oban Baptist Church 
Proposal: Demolition of existing buildings and erection of new
church/community building with associated landscaping works
Site Address:  Oban Baptist Church, Albany Street, Oban 
DECISION ROUTE 
☐Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☒Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission 
 Erection of church/community building 
(ii) Other specified operations 
 Demolition of existing buildings 
 Connection to public water network 
 Connection to public drainage network 
(B) RECOMMENDATION: 
Having due regard to the Development Plan and all other material considerations,
it is recommended that planning permission be granted subject to the conditions
and reasons appended to this report. 
(C) CONSULTATIONS:   
Argyll and Bute Council - Roads Authority 
Report dated 16/05/23 advising no objection to the proposed development
but noting that a Traffic Management Plan will be required during the
construction period. 
Argyll and Bute Council - Environmental Health Service (EHS)

Page 2

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Memo dated 05/06/23 advising no objection to the proposed development
but providing advisory comments with regards to the operation of the
development should permission be granted. 
Argyll and Bute Council – Environmental Health Service (Contaminated
Land) 
Memo dated 08/06/23 advising that as there is potential for asbestos to be
contained within the existing structures, the Applicant will be responsible
for undertaking an asbestos survey prior to any building works should
permission be granted.  An informative will be added to the grant of
permission advising the Applicant of this advice. 
Argyll and Bute Council - Conservation Officer 
E-mail dated 01/06/23 advising, in summary, that the preferred option
would be to demolish the 2 buildings to the east of the church and design
a new extension to the church to replace these – thereby retaining the
historic building that has for over a century been a landmark building in the
town, and providing a compromise in terms of creating one large building
that is suited to the congregation’s requirements but reduces the demolition
requirement.  A less preferred but second option would be to re-use the
existing stone of the church into the new design, rather than disposing of
this and bringing in a new stone cladding as proposed.  The comments from
the Conservation Officer, and the subsequent discussions with the
Applicant, are discussed in more detail in the assessment of the proposal
in Appendix A of this report. 
Oban Community Council (OCC)  
Letter dated 08/06/23 advising, in summary, that they have tried to balance
the needs of an expanding and active church congregation, and the
undoubted and desirable benefits that it brings and will continue to bring to
the community, against the desirability to preserve an old building.   The
OCC discussed the potential to retain the church building and erect a new
building either as an extension to the church or a separate building but
advised that they are not qualified to comment on such a proposal without
sight of plans.  The OCC also advised that they are not qualified to
comment on the potential reuse of materials that might be salvaged from
the existing church building.  The OCC noted the concerns of third parties
regarding other disused church buildings currently empty with no indication
that they will be preserved or put into new uses in the foreseeable future. 
However, the OCC advised that consensus view was that the needs of the
church congregation should be afforded the higher priority therefore
confirmed their support of the proposed development. 
Historic Environment Scotland (HES) 
Letter dated 07/07/23 advising that they do not find the church building to
be a building of special architectural or historic interest and accordingly they
declined the request by third parties to have the building Listed. 
Scottish Water 
Letter dated 03/05/23 advising no objection to the proposed development
which will be serviced from the Tullich Water Treatment Works and the
Oban Waste Water Treatment Works.  Scottish Water do however advise
that further investigations may be required once formal application for
connection are submitted to them for consideration.

Page 3

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Health and Safety Executive 
E-mail dated 02/05/23 advising no objection to the proposed development. 
Consultation responses are published in full on the planning application file
and are available to view via the Public Access section of the Council’s
website. 
(D) HISTORY:   
96/00028/DET 
Proposed parking and access amendment – Granted: 16/04/96 
(E) PUBLICITY:   
The proposal has been advertised in terms of Regulation 20 and Neighbour
Notification procedures, overall closing date 01/06/23. 
(F) REPRESENTATIONS:   
(i) 12 objections, 1 representation and 48 expressions of support have
been received to the application. 
OBJECTIONS 
Mr David Sclater, 13A Argyll Street, Oban, PA34 5SG (23/06/23)
Oban and Ganavan Heritage – by e-mail only (07/06/23 & 09/11/23)
Edna Price – by e-mail only (08/06/23 & 11/09/23) 
Ms Jane Terris, Portlea, Gallanach Road, Oban, PA34 4LS (08/06/23) 
Mr Jack Tait Westwell, 1/2 634 Alexandra Parade, Glasgow, G31 3BT
(07/06/23 & 04/09/23)
Mr Andrew Thornton, Flat 1, Laroch House, Ballachullish, PH49 4JE
(06/06/23 &09/09/23
Mr A. Gordon, Teven Cottage, Ganavan Road, Oban, PA34 5TU (05/06/23) 
Miss Ann Terris, Teven Cottage, Ganavan Road, Oban, PA34 5TU
(25/05/23) 
Mr Robin Russell, Flat 1/1, 1 Glenshellach Terrace, Oban, PA34 4BH
(24/05/23) 
K. McCusker, 3d Cawdor Terrace, Oban 
Ms Catherine MacGillvray, 9 Lorn Road, Dunbeg, PA37 1QG (23/05/23) 
Lorna Tait – by e-mail only (22/05/23) 
REPRESENTATIONS 
Oban District Access Panel – e-mail only (04/06/23) 
SUPPORT 
Mrs Morag Head, 1 Orchy Gardens, Oban, PA34 4JR (08/06/23) 
Mrs Fiona Leadbeater, Sidhean Mhor, Kilmore, PA34 4XX (08/06/23)
Dr Philip Toms, Treshnish, Glenmore Road, Oban, PA34 4PG (08/06/23) 
Mr Stephen Dangana, 1A Dalintart Drive, Oban, PA34 4EE (07/06/23) 
Mrs Favour Dangana, 11A Dalintart Drive, Oban, PA34 4EE (-7/06/23)

Page 4

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Mr Daniel Rimmer, Kilchurn, Soroba House, Mews, Oban, PA34 4SB
(07/06/23)
Mrs Rachel Heald, 6 Pendean, Burgess Hill, RH15 0DW (07/06/23) 
Mr Andrew Heald, 6 Pendean, Burgess Hill, RH15 0DW (07/06/23) 
Mr Russell Daniels, 12 Lonan Drive, Oban, PA34 4NN (07/06/23) 
Mr John Durat MacRae of Kergord, 1 Ford Spence Court, Benderloch,PA37
1PY (07/06/23) 
Mr David O’Brien, Schiehallion, Rowan Road, Oban, PA34 5TQ (07/06/23) 
Mrs Sandra MacColl, 12 Aros Close, Oban, PA34 4RN (07/06/23) 
Mr Christopher Farley, Lochnell Cottage, North Connel, PA37 1RW
(07/06/23) 
Mrs Lismore Farley, Lochnell Cottage, North Connel, PA37 1RW (07/06/23)
Miss Mary Black, 5A Albany Street, Oban, PA34 4AR (07/06/23) 
Mrs Beryl Carmichael, 5 Orchy Gardens, Oban, PA34 4JR (07/06/23) 
Mr David Valentine, Burnside, Kilmore, PA34 4XT (06/06/23) 
Mrs Carol Chalmers, Fearnoch View, North Connel, PA37 1QX (06/06/23)
Mr William Stuart Kennedy Chalmers, Fearnoch View, North Connel, PA37
1QX (06/06/23) 
Mr David Vandervoorde, 23 Java Houses, Craignure, Mull, PA65 6BE
(06/06/23)
Miss Marianne Fell, 8 Park Road, Oban, PA34 4GZ (06/06/23)
Mr George Gray, Sonas, Ardentallen, Oban, PA34 4SF (06/06/23)
Mrs Patricia Morrison, 3 Creran Gardens, Oban, PA34 4JU (06/06/23) 
Mr C.E. Morrison, 3 Creran Gardens, Oban, PA34 4JU (06/06/23) 
Ms Isla Farley, 23 Java Houses, Craignure, Mull, PA65 6BE (05/06/23) 
Ms Margaret Taylor, 15 Inverbhreac Cottages, Barcaldine, PA37 1AH
(05/06/23)
Mr Ewan Stuart – by e-mail only (05/06/23) 
Mrs Susan Windram, Taigh Nam Faclan, Kilchrenan, PA35 1HD (05/06/23) 
Mrs Claire Keen, Ben Alder, Ardconnel Road, Oban, PA34 5DR (05/06/23) 
Mrs Elizabeth Deverill, 8 Lonan Drive, Oban, PA34 4NN (05/06/23) 
Maureen O’Brien, Schiehallion, Rowan Road, Oban, PA34 5TQ (05/06/23) 
Mrs Sue Turner, Ealachan Bhana, Clachan Seil, Oban, PA34 4TL
(05/06/23) 
Miss Jenny Low, 4 Campbell Crescent, Oban, PA34 4DE (05/06/23) 
Mrs Aimie Baker, 9 Tynribbie Place, Appin, PA34 4DS (05/06/23) 
Miss Karen Campbell, Flat B, 13 Corran Brae, Oban, PA34 5AJ (05/06/23)
Mrs Dawn Singleton, Tigh na Ros Bhain, Clachan Seil, Oban, PA34 4TL
(05/06/23)
Miss Wendy Whyte, 25 Camus Road, Dunbeg, PA37 1QD (05/06/23) 
Miss Hannah Stevenson, 27B Glencruitten Drive, Oban, PA34 4EQ
(05/06/23) 
Mrs Kathryn Sadler, The Manse, Ganavan Road, Oban, PA34 5TU
(05/06/23) 
Mrs Carole Gatward, Camu Darach, Ganavan Road, Oban, PA34 5TU
(05/06/23)
Mrs Helen Daniels, 12 Lonan Drive, Oban, PA34 5NN (05/06/23) 
Melissa Van Eck, 25D Kerrera Terrace, Oban, PA34 5AT (05/06/23) 
Mrs Susan C. Hamilton, Innishmore, Ellenabeich, Isle of Seil, PA34 4RQ
(05/06/23)
Mrs Jade Brown, 20 Castle Road, Dunbeg, PA37 1QH (05/06/23)
Ms Caroline Sharp, Sonas, Dalmally, PA33 1AE (05/06/23) 
Linda Hill – by e-mail (29/05/23) 
Miss Heather Morrison, Tigh a Mhonaidh, North Connel, PA37 1QZ
(25/05/23)

Page 5

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Miss Sara Hiam, Tigh a Mhonaidh, North Connel, PA37 1QZ (25/05/23) 
Representations are published in full on the planning application file and
are available to view via the Public Access section of the Council’s website. 
(ii) Summary of issues raised: 
OBJECTION 
Historic Importance of the Building 
 The building is a local landmark and is in keeping with the style of a lot of the
older buildings and monuments in Oban which give the town its unique
distinctive character. 
 The church is a building of architectural, historical and cultural importance by
the well-known Scottish architect Alexander Shairp. 
 Historical and cultural heritage is of huge importance to the tourism industry
and local business.   
 Once these old buildings are destroyed they can never be brought back. 
 All buildings like this church should be listed by default. 
 The robust, simple church building is in remarkably good condition and has
been well maintained. 
 The church building is worthy of protection, it has recently been re-roofed and
could sustain a life span of another 100 years. 
 The church is an important feature of our local and Scottish heritage, built
with local Bonawe granite by skilled craftsmen, this cannot be repeated or
replaced. 
 The building was purpose built as a Baptist Church and has continued in this
use for nearly 120 years, as such it is part of the wider Baptist Church
Heritage, both in Oban and across the UK. 
 Many local people in Oban regard Oban Baptist Church with great affection
and its absence will be held with much regret. 
Officer Comment:  Whilst these comments are noted, the church building is not
listed, nor is it within an area benefiting from a statutory designation which affords
it protection.  Whilst the church is a historic building, as detailed by HES, the
building does not demonstrate special design quality within its common building
type or for its building date. 
The demolition of the building to facilitate the redevelopment of the site to serve
the Oban Baptist Church is considered to be an appropriate development which
is discussed in more detail in the assessment of the application within Appendix
A of this report. 
Alternative Scheme without Demolition of Existing Building

Page 6

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
 There is no requirement from an architectural perspective to demolish the
church when there are two additional buildings that could provide an area for
further extension. 
 A conversion that retains and utilises the existing stone church with modern
upgrades would be acceptable if the old church walls are still at least partially
on display for people to enjoy. 
 The demolition of the building is unnecessary as there is potential within the
site for further sensitive development to accommodate the growing needs of
the church. 
 The current church building could easily be retained and extended to offer a
panoramic view whilst accommodating the expressed needs of a growing
church and maximising the opportunity that the site offers.   
 Retention, extension and adaption of the existing building is more
environmentally sustainable than demolition and rebuild. 
 An extension to the west would also provide ancillary accommodation below
the church since the site has a substantial change in level in this direction. 
 The adjacent 1960s buildings could be demolished to accommodate all the
requirements of the new church.  The areas are approximately the same as
the proposed building. 
 Alternative more satisfactory options can be considered on the same site
without the need for demolition of one of Oban’s finest buildings. 
Officer Comment: Whilst these comments are noted, the building is not listed,
nor is it within an area benefiting from a statutory designation which affords it
protection.  Notwithstanding this, the proposal for the demolition of the building
and redevelopment of the site is fully assessed against the relevant National and
Local Policies within Appendix A of this report. 
Design/Function of Proposed Development 
 Anything that would replace this historic building would only ever be a poor,
short lived substitute for a building that has stood for decades. 
 The proposal is to provide a larger place for worship, this is not evident in the
proposal.  The proposed plans in the new space for worship is virtually the
same size as the existing church. 
Officer Comment: The design of the proposed replacement church/community
building is considered to represent an acceptable design solution which is
discussed in more detail in the assessment in Appendix A of this report. 
The proposed development is not just about the area to be provided for worship,
it is to provide a facility that serves the ever increasing needs of the church, its
congregation and its numerous associated community based activities. 
Existing Built Heritage

Page 7

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
 The existing church enhances and complements the surrounding built
heritage much of which is listed, and protected.   
 The building is currently being considered for Listed Building status by HES. 
Officer Comment:  It is noted that there are some Listed Buildings in the vicinity
of the site, details of which are discussed in more detail in the assessment of the
proposal in Appendix A of this report.  There are also a number of modern, unlisted
buildings of no particular architectural merit in the vicinity of the site. 
HES did not find the building to be a building of special architectural or historic
interest and accordingly they decided not to designate the building as a LB.  This
is discussed in more detail in the assessment of the proposal in Appendix A of
this report. 
Sustainability/Re-Use of Materials 
 Demolition is a topical subject in the construction world and the effects on
global warming are increasingly realised to be most significant. 
 The church is built of solid stone granite, with thick walls all built in lime mortar
the demolition of which will result in substantial loss of resources, energy and
material. 
 Reusing the granite for a new building would be difficult as it is hard to dress
and modern buildings have much thinner walls.  A new building would almost
certainly use cement mortars which would add further complications. 
 Reusing the material is not an option due to the loss of embodied energy and
loss to timber, slate etc. 
 The financial costs alone make demolition an unsustainable option.   
 In an era of upcycling and recycling, the environmental impact of a new build
would be a lot more damaging than the repurposing and altering of the
existing building. 
Officer Comment:  These comments are noted by the Planning Authority and are
fully considered in the assessment of the application within Appendix A of this
report.   
Compliance with Planning Policy 
 It is important the Argyll and Bute Council make their decision based on their
own promises and policies set out clearly in their own words to their electorate
and do not become distracted by any emotional arguments on either side. 
 Planning policies do not support this application and they should be
vigorously applied in the consideration of this application. 
 Argyll and Bute Council made a commitment to ensure the protection of its
historic environment the scope of which the church falls within.

Page 8

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
 The proposal does not support the protection, conservation and
enhancement of the historic building environment and does not enhance the
cultural heritage. 
 What evidence do the Council have to demonstrate that all alternatives have
been explored before approving the planning application. 
 The application should not be determined until a decision on proposed Local
Development Plan 2 is made. 
Officer Comment:  The proposal subject of this application is assessed against
the relevant National and Local Policies in Appendix A of this report. 
The building is not subject of any statutory protection and accordingly there is no
need for evidence of alternatives to be submitted in support of the application. 
The policies of Local Development Plan 2 have been considered in the proposal,
details of which are set out in the assessment of the application in Appendix A. 
Impact of the Loss of the Building on the Community 
 The effect of demolition of the building on local people who value their
townscape is unfair and disrespectful. 
 Such loss is known to lower self-esteem and identity, with many local people
experiencing this and recognising the loss of previous demolitions of finer
examples of Oban’s architecture e.g. Railway Station, Oban High School and
many others. 
Officer Comment:  Local people have had the opportunity to submit their views
on the proposal during the consultation period of the planning application with all
comments fully considered during the application process. 
The Planning Authority is not suitably qualified to comment on the impact that
demolition of a building can have on the self-esteem of individuals. 
General 
 The application in our current economic climate is an extreme and unusual
approach from a religious denomination which divides the community. 
 The application does not justify the need for the proposed development. 
 Despite requests from the Planning Authority, the Applicant has not provided
an Options Appraisal, Conditions Assessment or Sustainability Statement. 
Officer Comment:  The application has been submitted with information from the
Applicant demonstrating the approach behind the proposal for the demolition and
redevelopment of the site in order to provide suitable accommodation for the
various activities currently undertaken by the church. 
It’s not clear why it is thought that the proposal is an unusual approach from a
religious denomination.

Page 9

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
It is not considered that the proposal has divided the community, whilst objections
from 12 individuals have been received, none of whom are members of the
congregation, 48 expressions of support have been received for the proposed
development, with many of these being from members of the congregation who
regularly use the existing facilities. 
The Planning Authority is satisfied with the level of information submitted in the
application which is discussed in more detail in the main assessment of the
application in Appendix A of this report. 
Traffic, Parking Provision and Impact During Construction 
 There is no allowance for sufficient parking and there has been no Traffic
Impact Analysis submitted. 
 At least two planning applications have been knocked back at that end of
town for private dwellings, the reasons given were that they weren’t in
keeping with surrounding buildings, and extra houses mean more traffic. 
 If, as claimed, this congregation has outgrown their building, surely a larger,
modern style of building, would attract more traffic, and not be in keeping with
surrounding buildings.  This would highlight inconsistencies in the way
applications are dealt with. 
 If the project was to go ahead the building works would cause chaos for the
people that live on Albany Street, Gallanach Road and Shore Street.  This
type of chaos is already being seen with wide lorries crawling their way along
these roads with chalets on the back of them, often with no warning, and at
inconvenient times, resulting in people knocking on doors, demanding cars
get moved to let them through. 
Officer Comment:  The premises as existing do not provide for on-site parking
and turning.   
The proposal to redevelop the site to provide improved facilities for the church
and will continue to utilise existing town centre parking provision.  The Council’s
Roads Engineer raised no objection to the proposed development in this regard. 
It is not clear what exactly the statements regarding the two planning applications
which were ‘knocked back’ are alluding to.  Without details of the applications
referenced, the Planning Authority is unable to provide a comment on this
statement. 
The Council’s Roads Authority has detailed the need for a Traffic Management
Plan for the construction period of the proposed development.  Such details will
be sought by condition imposed on the grant of permission which will require to
be agreed by the Planning Authority, in consultation with the Roads Authority,
prior to any works starting on site. 
Setting a Precedent 
 Granting of permission for demolition of this historic building will set a
precedent for owners of similar buildings who no longer want to maintain
them and seek an easy way out of their obligations.

Page 10

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Officer Comment:  The granting of permission for the demolition of the building
subject of this application in no way infers that any future applications for
demolition will necessarily be supported.  Each planning application submitted is
considered on its own merits in accordance with the Development Plan in force
at the time along with all other material planning considerations. 
SUPPORT 
 The people of the church have spent many years looking for alternative
accommodation in the town to cater for an expanding congregation.  The
church has given so much thought and consideration to all the options
available to them to create a space that is fit for purpose, including
keeping/extending/refurbishing the current building.  Unfortunately no
suitable solution has been found which allows expansion of the community
based work. 
 The church leadership has been diligent in consulting the community about
the proposals, even changing the original aspect in the plans to
accommodate neighbours’ concerns about losing their views. 
 The church has spent 7/8 years to come to the conclusion that a new building
is the only solution if the congregation want to continue to gather on this site. 
5 different architects were engaged to draw up plans for both a new build and
a building integrating the existing church on site.  Various options were
considered, including moving to other church buildings, none of which were
viable.  Members, adherents and friends have been consulted continuously
throughout the process and, as a body, the overwhelming decision was to
take the current route.  
 The church has a clear vision to serve the people of Oban and increase its
positive social impact, continuing to welcome and support all members of the
local community. 
 The church building is no longer fit for purpose suffering from damp, mould
and poor heating.  There is a need to replace it with an energy saving, well
insulted building that is economical, protects the environment and the health
of the people who use it. 
 Due to the expanding numbers of the congregation, and the increased
opportunity to engage with the local community the existing building is not fit
for purpose and new premises are required. 
 Sadly, and importantly, more often than not the church is unable to host major
life events normally expected of a church, such as funerals, weddings and
baptisms due to size and facility restrictions, resulting in the Minister having
to conduct such services at other churches in order to cater for large
gatherings. 
 When the church opened in 1904 the population of Oban was around 5000. 
The current population of Oban and Lorn has more than doubled since then
rising to around 25000 in the summer months.

Page 11

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
 In 1904 the church held 3 services per week and was used for approximately
4/5 hours per week.  Today the work of the church spans 7 days per week in
a variety of spiritual/social support/educational facilities. 
 It is evident that the church community is growing, already having to host
meetings elsewhere because the current buildings are not fit for the current
purpose.  When church attendance and membership is declining countrywide
the Oban Baptist Church is bucking the trend. 
 The current building is too small for the existing congregation, let alone
newcomers.  Sunday morning services are currently being held in Oban High
School due to lack of capacity within the church. 
 The church serves the religious community and other valued social activities
such as the free school uniform exchange, the mother and toddler group and
activities for young people.  The new church building will not only be used on
a Sunday, the plan is to open all week to serve the community.   
 The church seeks to be able to provide a safe, all access facility, not just for
regular church goers but also to the many outside groups who already use
the buildings on a regular basis. 
 What is the lost opportunity, or even social damage that could occur if the
church’s proposals are not accepted. 
 The church is often overcrowded and has very poor toilet and catering
facilities with no disabled facilities.   
 The new project took into consideration its impact on the neighbouring
properties.
 The design of the proposed building is attractive and will add to the beauty of
the environment, it also has a lower roof line than the existing church which
will allow neighbours of the church an improved sea view. 
 The new church building will present a wonderfully welcoming view to
everyone who should see it from both land and sea. 
 A Christian church’s purpose is to serve its neighbouring community and
grow.  The old church has faithfully served the Baptist Church for many years,
but churches are not defined by their buildings, but instead by their
congregations. 
 The church is a community of people, not a building. 
 Likewise, towns like Oban are not defined merely by their architecture, but by
the people who call it home and help the community to thrive. 
 Old buildings, when they can be repurposed can absolutely be a part of a
new Oban, look no further that the redeveloped Rockfield Centre.  However,
the church building is not suitable for such a proposal. 
 The church cannot expect an ever expanding congregation to be forced into
such a small building, it is not appropriate.

Page 12

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
 Having worshipped in this church for forty years now, with lots of special
memories, sadly the building is no longer fit for purpose. 
 As a regular visiting member of the congregation, we have witnessed how
the existing building constrains the activities and outreach into the community
that the church undertakes. 
 Working with Hope Kitchen, there is need for supporting community groups
for families and individuals. 
 Whilst history is important, it is also important to create space for new
architectural works that can be remembered and protected by the younger
generation.   
 The proposal represents a well thought through and sensitively planned new
building which blends in with the area and provides facilities for both the
church and other organisations to thrive. 
 The proposal represents a breath of fresh air to the town.   
 Whilst it is important to hear the views of all, the best judges as to the future
of the building are those who are part of the church community, not external
individuals or groups. 
 Whilst heritage is important, it rarely impacts the poor and the
disenfranchised and seems to be the preserve of most who have never set
foot into the current building. 
 There are fake hysterical outbreaks on social media from people who don’t
live in the area, aren’t members of the church and are not impacted by this
decision one way or the other. 
 If the congregation support the proposal, and the new plans do not impact
the neighbours, then they should be allowed to redevelop the site as they see
fit. 
 It is hoped that the Council will take everything into account from the needs
of the community looking to do something innovative and new and of course,
any real objections. 
 As beautiful as they are, Victorian buildings, such as this one, were never
intentionally designed to meet the needs of disabled people, due to most
disabled people being institutionalised or hidden away from society during
the Victorian era and accordingly disabled access and facilities were not
required. 
 The Scottish Government has explicit duties to promote, protect and ensure
the human rights of disabled people, this includes supporting disabled people
to participate fully in society, including access to buildings.  It will need more
than a ramp for the existing building to meet the varied requirements of
different types of disability needs experienced throughout the community.  A
new modern church building and community space, specifically designed to
incorporate such considerations, would be beneficial to both old and young
alike.

Page 13

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Officer Comment:  These expressions of support are noted by the Planning
Authority. 
REPRESENTATION 
 Overall, the Oban and District Access Panel commends the Inclusive Design
approach adopted by the architects. Both the accessible toilets meet the
BS8300 standard and the folding door is a clever solution; and at the main
entrance, the width of just one of the double door leaves will accommodate
the largest wheelchair. There appears to be a lift but it is not identified on the
plan. 
The Panel noted the strong supporting statement and in particular the
reference to wheelchair access and hearing loops. 
The Panel supports the application subject to: 
Ideally, at least 2 accessible parking bays should be provided within 40m of
the main entrance to the building, and signed as such. 
Whilst noting the 1:50 gradient at the main entrance doors, it is important that
the force of any door closing device for each single door leaf is easily usable
by an independent wheelchair user. 
A passenger lift should be provided between the two floors. To accommodate
a wheelchair user and a carer or one other person this should be a minimum
of 1100 x 2000mm. 
If the seating in the main hall is fixed (as opposed to flexible) at least three
wheelchair stances should be provided together with easy access thereto. 
An audio loop system should be provided for the main hall area 
Officer Comment:  These comments are noted by the Planning Authority
and will be provided to the Applicant for review. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact
Assessment Report:
☐Yes ☒No 
(ii) An Appropriate Assessment
under the Conservation
(Natural Habitats)
Regulations 1994:   
☐Yes ☒No 
(iii) A Design or Design/Access
statement:   
☒Yes ☐No A Client Statement has
been submitted with the application. 
(iv) A report on the impact of the
proposed development e.g.
☐Yes ☒No

Page 14

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Retail impact, transport
impact, noise impact, flood
risk, drainage impact etc:     
(H) PLANNING OBLIGATIONS 
Is a Section 75
agreement required:  
☐Yes ☒No 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  ☐Yes ☒No 
(J) Section 25 of the Act; Development Plan and any other material
considerations over and above those listed above which have been taken
into account in the assessment of the application 
(i)  List of all Development Plan Policy considerations taken into
account in assessment of the application.

Page 15

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 7 – Historic Assets and Places 
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings
(includes provisions relevant to Greenfield Sites)
NPF4 Policy 12 – Zero Waste
NPF4 Policy 13 – Sustainable Transport 
Liveable Places
NPF4 Policy 18 – Infrastructure First 
‘Argyll and Bute Local Development Plan’ Adopted March 2015 
LDP STRAT 1 – Sustainable Development 
LDP DM 1 – Development within the Development Management Zones 
LDP 3 – Supporting the Protection Conservation and Enhancement of our
Environment 
LDP 8 – Supporting the Strength of our Communities 
LDP 9 – Development Setting, Layout and Design 
LDP 10 – Maximising our Resources and Reducing our Consumption 
LDP 11 – Improving our Connectivity and Infrastructure 
Local Development Plan Schedules 
Area for Action (AFA) 5/1- Oban – South Pier/Railway
Strategic allocation for town centre/waterfront development and management 
‘Supplementary Guidance to the Argyll and Bute Local Plan 2015’ (Adopted
March 2016 & December 2016) 
Natural Environment 
SG LDP ENV 1 – Impact on Habitats, Species and our Biodiversity 
Landscape and Design 
SG LDP ENV 14 – Landscape 
Historic Environment and Archaeology 
SG LDP ENV 16(a) – Impact on Listed Buildings
SG LDP ENV 21 – Protection and Enhancement of Buildings 
Sport, Leisure, Recreation and Open Space 
SG LDP REC/COM 1 – Sport, Recreation and Community Facilities 
Sustainable Siting and Design

Page 16

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
SG LDP Sustainable – Sustainable Siting and Design Principles 
Resources and Consumption 
SG LDP SERV 2 – Incorporation of Natural Features / SuDS
SG LDP SERV 5(b) – Provision of Waste Storage & Collection Facilities within
New Development 
Transport (Including Core Paths) 
SG LDP TRAN 2 – Development and Public Transport Accessibility
SG LDP TRAN 4 – New & Existing, Public Roads & Private Access Regimes
SG LDP TRAN 6 – Vehicle Parking Provision

Page 17

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
(ii)  List of all other material planning considerations taken into account
in the assessment of the application, having due regard to Annex A
of Circular 3/2013. 
 Third Party Representations
 Consultation Reponses
 ABC Technical Note – Biodiversity (Feb 2017) 
Argyll and Bute proposed Local Development Plan 2 (November 2019) – The
Examination by Scottish Government Reporters to the Argyll and Bute Local
Development Plan 2 has now concluded and the Examination Report has been
published (13th June 2023). The Examination Report is a material consideration
of significant weight and may be used as such until the conclusion of the LDP2
Adoption Process. Consequently, the Proposed Local Development Plan 2 as
recommended to be modified by the Examination Report and the published Non
Notifiable Modifications is a material consideration in the determination of all
planning and related applications. 
Spatial and Settlement Strategy 
Policy 01 – Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places 
Policy 05 – Design and Placemaking
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development
Policy 15 – Protection, Conservation and Enhancement of Our Historic
Environment 
Connected Places 
Policy 35 – Design of New and Existing, Public Roads and Private Access
Regimes
Policy 40 – Vehicle Parking Provision 
Sustainable Communities 
Policy 49 – Sport, Recreation and Community Facilities
Policy 61 – Sustainable Urban Drainage Systems (SUDS)
Policy 63 – Waste Related Development and Waste Management 
High Quality Environment 
Policy 73 – Development Impact on Habitats, Species and Biodiversity 
Local Development Plan 2 Schedules 
Area for Action A4004 – Oban-South Pier/Railway

Page 18

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☐Yes ☒No 
(L) Has the application been the subject of statutory pre-application
consultation (PAC):  ☐Yes ☒No 
(M) Has a Sustainability Checklist been submitted:  ☒Yes ☐No 
(N) Does the Council have an interest in the site:  ☐Yes ☒No

Page 19

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
(O) Requirement for a pre-determination hearing 
In deciding whether to hold a discretionary hearing Members should consider:  
 How up to date the Development Plan is, the relevance of the policies to the
proposed development, and whether the representations are on development
plan policy grounds which have recently been considered through the
development plan process. 
 The degree of local interest and controversy on material considerations, together
with the relative size of community affected, set against the relative number of
representations and their provenance. 
At the time of writing, representations have been received by the Planning Authority from
61 respondents in relation to this planning application. 12 respondents raise objection, 48
provide support and 1 submits a representation. 
In the context of the population of Oban, which is approximately 9000, 12 objections is
considered to be a relatively small number. 
The main thrust of objection relate to the demolition of the church building.  However, as
set out in the main assessment of the proposal in Appendix A of this report, the demolition
of the building would benefit from ‘deemed permission’ under the GPDO and therefore
this aspect of the proposal is outwith the remit of the Council as Planning Authority. 
With regards to the other concerns raised by objectors in relation to the access and
infrastructure arrangements to serve the proposed development, it should be noted that
the site is already operating a similar development to that proposed in the application. 
Furthermore, in response to the application, consultees did not raise any concerns with
regards to the proposed development and its impact on existing infrastructure
arrangements or its impact on the amenity of the area. 
As a minor departure to NPF4 Policy 9 with regards to demolition, which can be
undertaken without any input from the Planning Authority, the proposal is otherwise
consistent with the provisions of both Local and National Policy and it is not considered
that a hearing would add anything to the planning process.    
(P)(i) Key Constraints/Designations Affected by the Development: 
 N/A

Page 20

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
(P)(ii) Soils
Agricultural Land
Classification: 
Built Up Area
Peatland/Carbon Rich Soils
Classification:
☐Class 1
☐Class 2
☐Class 3
☒N/A
Peat Depth Classification: N/A  
Does the development relate
to croft land?
☐Yes ☒No
Would the development
restrict access to croft or
better quality agricultural
land?
☐Yes ☐No ☒N/A
Would the development
result in fragmentation of
croft / better quality
agricultural land?
☐Yes ☐No ☒N/A 
(P)(iii) Woodland  
Will the proposal result in
loss of trees/woodland?
(If yes, detail in summary
assessment)
☐Yes
☒No 
Does the proposal include
any replacement or
compensatory planting?
☐Yes
☐No details to be secured by condition
☒N/A  
(P)(iv) Land Status / LDP Settlement Strategy
Status of Land within the
Application
(tick all relevant boxes)
☒Brownfield
☐Brownfield Reclaimed by Nature
☐Greenfield 
ABC LDP 2015 Settlement
Strategy 
LDP DM 1 (tick all relevant
boxes) 
☒Main Town Settlement
Area
☐Key Rural Settlement Area
☐Village/Minor Settlement
Area
☐Rural Opportunity Area
☐Countryside Zone
☐Very Sensitive
Countryside Zone
☐Greenbelt
ABC pLDP2 Settlement Strategy
(tick all relevant boxes) 
☒Settlement Area
☐Countryside Area
☐Remote Countryside Area
☐Helensburgh & Lomond Greenbelt

Page 21

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
ABC LDP 2015
Allocations/PDAs/AFAs
etc: 
AFA 5/1 
ABC pLDP2 Allocations/PDAs/AFAs etc: 
A4004 
(P)(v) Summary assessment and summary of determining issues and material
considerations 
The proposal the subject of this application is seeking to secure planning
permission for the demolition of the existing Oban Baptist Church (OBC)
and ancillary buildings to allow for the erection of a replacement
church/community building. 
In terms of the Settlement Strategy set out in the adopted LDP, the
application site is situated within the defined Main Town Settlement Zone
of Oban where Policies LDP STRAT 1 and LDP DM 1 give general
encouragement, up to and including large scale, on appropriate sites. 
These main policy considerations are underpinned by the SG contained
within SG LDP REC/COM 1 and SG LDP ENV 14 which offer further
support to new or improved community facilities where such development
would have no significant adverse impact upon the character of the
landscape and where there is no unacceptable environmental, servicing or
access impact.   
The application comprises a roughly triangular shaped area of ground
situated at the western end of Albany Street at its junction with Shore Street
within the main town centre of Oban.   
Albany Street forms the southern boundary of the application site with
Shore Street forming its southern and western boundaries.  The northern
boundary of the site is delineated by a long established dental practice
building and parking area.  The site slopes down from Albany Street to
Shore Street.   
The site is currently occupied by three buildings, the main OBC building,
the church hall and a detached bungalow, all of which are in use by the
OBC for its various functions. 
The proposal is seeking to secure planning permission for the demolition of
the OBC building and the two associated ancillary buildings to allow for its
redevelopment with a new purpose built church/community building to
serve the OBC. 
Whilst a historical building, the OBC is not covered by any statutory
designation nor is it within any area benefiting from statutory protection. 
The new building is a contemporary designed, split-level structure which
presents as a single storey mono-pitched roof structure to Albany Street
with a two storey pitched roof element presenting to Shore Street.  As the
ground slopes down from Albany Street to Shore Street, the proposed
building sits low in the site with its roof height lower than that of the existing
OBC building.

Page 22

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
No change to the existing servicing or infrastructure arrangements currently
serving the site are proposed as part of this application which comprise
utilisation of town centre parking provision and public water and drainage
connections. 
The proposal has elicited 12 objections, 1 representation and 48
expressions of support. 
The Oban Community Council recognise that the needs of the church
congregation should be afforded a higher priority than the concerns
regarding the loss of the building, both on historic and sustainability
grounds.   
A key factor in the assessment of this application is whether or not the
demolition of the existing three buildings to allow for the redevelopment of
a new purpose built facility to serve the needs of the OBC is consistent with
the provisions of the adopted National Planning Policy as underpinned by
the LDP and whether the issues raised by third parties raise material
considerations of sufficient significance to withhold planning permission. 
Whilst there is a clear expectation set out in NPF 4 policy 9 (d) that
demolition is the least preferred option the decision maker must also have
regard to the fact that the demolition of the building is development which,
on its own, would benefit from ‘deemed permission’ under the provisions of
Class 70 of the Town and Country Planning (General Permitted
Development (Scotland) Order 1992 (as amended) (GPDO), and as such
is a matter outwith the direct control of the Council as Planning Authority. 
The applicant has been provided with additional opportunity to demonstrate
that there is appropriate justification within the context of NPF 4 Policy 9(d)
to support the demolition proposed. Whilst the applicant has failed to
satisfactorily demonstrate this case it must also be acknowledged that the
proposal to redevelop the site is otherwise viewed to be consistent with all
other relevant provisions of the Development Plan, and on the basis that
the applicant does not in this instance require express permission from the
Council in order to undertake demolition works, it is considered that it would
be unreasonable to withhold permission solely on the basis of failure to
satisfy NPF 4 Policy 9(d).   
Taking account of the above, it is recommended that planning permission
be approved subject to conditions.   
A full report is provided in Appendix A. 
(Q) Is the proposal consistent with the Development Plan: ☐Yes ☒No 
(R) Reasons why Planning Permission Should be Granted:

Page 23

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Subject to a minor departure to NPF4 Policy 9, as detailed at Section S
below, the proposal is considered to be consistent with the relevant
provisions of the Development Plan and National Planning Framework 4
and there are no other material considerations of sufficient significance,
including issues raised by third parties, to indicate that it would be
appropriate to withhold planning permission having regard to Section 25 of
the Act. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
Whilst there is a clear expectation set out in NPF4 Policy 9(d) that
demolition is the least preferred option, it is neither expressly presumed
against nor has the Scottish Government made any legislative change to
the Town and Country Planning (General Permitted Development
(Scotland) Order 1992 (as amended) (GPDO) which would preclude the
demolition work benefiting from ‘deemed permission’ under Class 70. 
In this instance the demolition of the existing buildings does not require
express permission from the Council as Planning Authority and, given that
the proposal is otherwise considered to be consistent with all other relevant
provisions of the Development Plan, it is considered that it would be
unreasonable for the Council to withhold planning permission solely on the
basis that the applicant has failed to satisfy the requirements of NPF 4
Policy 9(d). 
The proposal is considered to be acceptable subject to being recognised
as a minor departure to the provisions of NPF4 Policy 9(d).   
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☒No 
Author of Report: Fiona Scott  Date: 25/10/23   
Reviewing Officer: Peter Bain Date: 06.11.2023 
Fergus Murray
Head of Development & Economic Growth

Page 24

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 23/00688/PP 
Standard Time Limit Condition  (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 31/03/23, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Existing Drawings   01  03/04/23
Location & Block Plans  AL- 001 -A3  21/04/23 
Topographical Plan  AL- 002 1-125 A2  03/04/23 
Existing Site Plan  AL- 003 A3  03/04/23 
Proposed Site Plan  AL- 004 A3  21/04/23 
Proposed Floor Plans  AL- 005 A1  03/04/23 
Proposed Elevations  AL- 006 A1  03/04/23 
Client Statement/Pre-Application
Consultation – 24 PAGES 
03/04/23 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
Note to Applicant 
Please note the comments in the consultation response from Scottish Water and the
comments provided in the submission from the Oban District Access Panel, details of
which are available to view on the planning application file via the Public Access
section of the Council’s website.  
2. PP – Traffic Management Plan 
Notwithstanding the effect of Condition 1, no development shall commence until a
Traffic Management Plan has been submitted for the written approval of the Planning
Authority in consultation with the Roads Authority. The Plan shall detail approved
access routes, agreed operational practices (including avoidance of convoy
movements, specifying conduct in use of passing places, identification of turning
areas, reporting of verge damage) and shall provide for the provision of an appropriate
Code of Practice to drivers of construction and delivery vehicles.  The development
shall be implemented in accordance with the duly approved Traffic Management Plan.  
Reason: To address potential abnormal traffic associated with the development in the
interests of road safety.   
3.  PP - Finishing Materials

Page 25

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Notwithstanding the effect of Condition 1, no development shall commence until
samples of materials to be used in the construction of the development hereby
approved have been submitted to and approved in writing by the Planning Authority.
The development shall thereafter be completed using the approved materials or such
alternatives as may be agreed in writing with the Planning Authority. 
Reason: In order to integrate the development into its surroundings  
4. PP - Reclamation of Materials 
No demolition works shall commence until a scheme for the reclamation of stone from
the Oban Baptist Church building, during or prior to demolition has been drawn up in
consultation with, and approved in writing by the Planning Authority. The stone shall
be satisfactorily set aside, stored and used within the redevelopment scheme in a
manner which shall first be agreed with by the Planning Authority, prior to any
demolition taking place. 
Reason: In order to protect and save materials and items which can reasonably be
retrieved, in the interests of the historical qualities of the building to be demolished.  
5. PP – Sustainable Drainage System 
Notwithstanding the provisions of Condition 1, the development shall incorporate a
surface water drainage system which is consistent with the principles of Sustainable
urban Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s SuDS
Manual C753. The requisite surface water drainage shall be operational prior to the
development being brought into use and shall be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and
to prevent flooding. 
Note to Applicant 
Further advice on SuDS can be found in SEPA’s Standing Advice for Small Scale
Development – www.sepa.org.uk  
6. PP - Waste Management 
Notwithstanding the effect of Condition 1, no development shall commence until a
Waste Management Strategy for the development has been submitted to and
approved in writing by the Planning Authority.   
The Waste Management Strategy shall include details of how much waste the
proposal is expected to generate and how it will be managed including: 
i. Details of provisions to maximise waste reduction and waste separation at source;
ii. Details of measures to minimise the cross-contamination of materials, through
appropriate segregation and storage of waste; convenient access for the collection
of waste; and recycling and localised waste management facilities. 
Thereafter the development shall be undertaken in accordance with the approved
Waste Management Strategy unless otherwise agreed in writing with the Planning
Authority. 
Reason:  In order to comply with the requirements of NPF4 Policy 12.

Page 26

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
7.  PP - Landscaping and Biodiversity Enhancement 
Notwithstanding the effect of Condition 1, no development shall commence until
details of the proposed treatment of the soft landscaping areas within the development
has been submitted to and approved in writing by the Planning Authority. 
The scheme shall include details of: 
i) Location, design and materials of proposed walls, fences and gates; 
ii) Surface treatment of proposed means of access and hardstanding areas; 
iii) Proposed hard and soft landscape works; 
iv) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits will
be maintained for the lifetime of the development. 
The development shall not be occupied until such time as the boundary and surface
treatment have been completed in accordance with the duly approved scheme. 
All physical biodiversity enhancement measures (bird nesting boxes, ‘swift bricks’,
wildlife ponds, bat and insect boxes, hedgehog homes etc) shall be implemented in
full before the development hereby approved is first brought into use. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being brought
into use. 
The biodiversity statement should refer to: Developing with Nature guidance |
NatureScot as appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity, and to comply with the requirements of NPF4 Policy 3.

Page 27

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION NUMBER:  23/00688/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. Introduction 
1.1. The proposal the subject of this application is seeking to secure planning permission for
the demolition of the existing church and ancillary buildings and the redevelopment of the
site to provide a replacement church/community building. 
2. Location of Development 
2.1. The application site comprises a roughly triangular shaped area of ground situated at the
western end of Albany Street at its junction with Shore Street within the Main Town
Settlement Zone of Oban.   
Albany Street forms the southern boundary of the application site with Shore Street
forming its southern and western boundaries.  The northern boundary of the site is
delineated by a long established dental practice building and parking area.  The site
slopes down from Albany Street to Shore Street.   
The site is currently occupied by three buildings, the main Oban Baptist Church (OBC)
building, the church hall and a detached bungalow. 
3. Settlement Strategy 
3.1 In terms of the Settlement Strategy set out in the adopted LDP, the application site is
situated within the defined Main Town Settlement Zone of Oban where Policies LDP
STRAT 1 and LDP DM 1 give general encouragement for sustainable developments, up
to and including large scale, on appropriate sites.  These main policy considerations are
underpinned by the SG contained within SG LDP REC/COM 1 and SG LDP ENV 14 which
offers further support to new or improved community facilities where such development
would have no significant adverse impact upon the character of the landscape and where
there is no unacceptable environmental, servicing or access impact.   
In terms of pLDP2, the site is identified as being within a ‘Settlement Area’ where Policy
01 gives a presumption in favour of redevelopment of brownfield sites where the proposed
development is compatible with surrounding uses; is of an appropriate scale and fit for the
size of settlement in which it is proposed; respects the character and appearance of the
surrounding townscape in terms of density, scale, massing, design, external finishes and
access arrangements; and is in compliance with all other relevant pLDP2 policies. 
Accordingly, in this instance, it is not considered that the proposal conflicts with Policy 02
of pLDP2. 
In order to address the determining issues, the key considerations in this application are: 
3.1.1. Compliance with the Development Plan and other relevant planning policy
3.1.2. Any other material considerations. 
4. Proposal

Page 28

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
4.1. The proposal is seeking to secure planning permission for the demolition of OBC and the
two associated ancillary buildings within its grounds to allow for the redevelopment of the
site with a new purpose built church/community building to serve the OBC. 
OBC comprises a single storey, pitched roof ecclesiastically designed structure which
takes a generally rectangular form with a small pitched roof entrance porch to its southern
elevation with a larger pitched roof projection to its southern elevation.  OBC incorporates
pointed arched windows and is finished in rusticated rubble with red sandstone quoins
and dressings with a natural slate roof. 
Whilst a historical building, OBC is not covered by any statutory designation nor is it within
any area which affords it statutory protection. 
The ancillary buildings comprise the church hall which is situated directly adjacent to the
OBC with its main frontage facing onto Albany Street.  The hall comprises a small, single
storey, shallow pitched roof structure finished in a mix of render and stone cladding with
a felt roof.   
The second ancillary building is situated to the north of OBC and hall comprising a single
storey, hipped roof, dorran style bungalow oriented with its main elevation facing towards
Shore Street.  The bungalow is finished in white painted render with a concrete roof tile. 
Both ancillary buildings are not considered to be of any particular architectural merit. 
The demolition of the buildings within the site will allow for the redevelopment of the site
with a purpose built church/community building to serve the needs of the church and its
congregation. 
The new building is a contemporary designed, split-level structure which presents as a
single storey mono-pitched roof structure to Albany Street with a two storey pitched roof
element presenting to Shore Street.  As the ground slopes down from Albany Street to
Shore Street, the proposed building sits low in the site with its roof height lower than that
of the existing OBC building. 
The main entrance into the building is from Albany Street which leads into a reception
area with a large foyer with a lounge/soft play area and seating area off of which are toilet
facilities, kitchen facilities and an office.  Beyond the entrance foyer is the main church
area with a capacity for approximately 200 seats.  A small triangular covered balcony
projects from the side elevation of the main church overlooking the church grounds.  Stairs
lead down from the main foyer area to a lower foyer area off of which there are a number
of meeting rooms and spaces.  External access is available to the lower foyer. 
The proposed building is to be finished in mix of render, natural stone cladding and timber
cladding on a basecourse of smooth brick with the roof finished in an Anthracite grey
coloured metal cladding.  Whilst the application proposes the use of natural stone
cladding, the Planning Authority will seek the stone reclaimed from the existing OBC
building is incorporated into the proposed development. 
Within the grounds, the application shows a new stone boundary wall extending along the
Albany Street frontage to the Shore Street frontage which merges into a boundary fence
which continues along the Shore Street frontage.  Within the site an area of paving is
proposed leading from the Albany Street entrance, via a set of stairs, to a paved area
adjacent to the lower foyer area of the building.  Small areas of landscaping and external
seating are provided within both the upper and lower areas of the site.

Page 29

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
No change to the existing access or infrastructure currently serving the OBC are proposed
as part of this application which comprise utilisation of existing town centre parking
provision and public water and drainage infrastructure. 
5. Compliance with National Policy 
5.1. NPF4 Policy 1 – Tackling the Climate and Nature Crises 
NPF4 Policy 1 seeks to prioritise the climate and nature crises in all decisions; it requires
to be applied together with other policies in NPF4. 
Guidance from the Scottish Government advises that it is for the decision maker to
determine whether the significant weight to be applied tips the balance in favour for, or
against a proposal on the basis of its positive or negative contribution to climate and
nature crises. 
In this case, given the small scale nature of the development proposed and its
alignment with all other relevant policies in NPF4 and those supporting policies in
the LDP, it is considered that the development proposed would be in accordance
with the broad aims of NPF4 Policy 1 as underpinned by LDP Policies STRAT 1,
LDP DM 1 and the adopted Sustainability Checklist and Policies 01 and 04 of
pLDP2. 
5.2.  NPF4 Policy 2 – Climate, Mitigation and Adaption 
NPF4 Policy 2 seeks to ensure that new development proposals will be sited to minimise
lifecycle greenhouse gas emissions as far as possible, and that proposals will be sited
and designed to adapt to current and future risks from climate change. 
Guidance from the Scottish Government confirms that at present there is no single
accepted methodology for calculating and / or minimising emissions. The emphasis is on
minimising emissions as far as possible, rather than eliminating emissions. It is noted that
the provisions of the Settlement Strategy set out within Policy LDP DM 1 of the ‘Argyll and
Bute Local Development Plan’ 2015 (LDP) 1 promotes sustainable levels of growth by
steering significant development to our Main Towns and Settlements, rural growth is
supported through identification of Key Rural Settlements and safeguards more sensitive
and vulnerable areas within its various countryside designations. 
It is considered that the proposed development would be consistent with Policy 2
of NPF4 having had due regard to the specifics of the development proposed and
to the overarching planning policy strategy outlined within the adopted LDP,
notably Policies STRAT 1, LDP DM 1, LDP DM 10 and the adopted Sustainability
Checklist and Polices 01 and 04 of pLDP2. 
5.3. NPF4 Policy 3 – Biodiversity 
NPF4 Policy 3 seeks to protect biodiversity, reverse biodiversity loss and deliver positive
effects from development and strengthen nature networks. 
In the case of the development proposed by this application, it is considered that there
are no issues of compliance with Policy 3.  No material biodiversity impacts have been
identified in the assessment of this application by the Planning Authority and whilst no
specific proposals for biodiversity improvements have been submitted, unusually for a
town centre site an area of soft landscaping has been identified within the site and
accordingly it is considered that proportionate measures for biodiversity enhancement

Page 30

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
can be delivered by planning condition. Such a condition will be attached to this
permission.   
With a condition to secure proportionate biodiversity enhancement and creation
opportunities the proposed development is considered to be consistent with NPF4
Policy 3 as underpinned by LDP Policy LDP 3 and SG LDP ENV 1 and Policy 73 of
pLDP2. 
5.4. NPF4 Policy 4 – Natural Places 
NPF4 Policy 4 seeks to protect, restore and enhance natural assets making best use of
nature-based solutions. 
The development proposed by the current planning application is considered appropriate
in terms of its type, location and scale such that it will have no unacceptable impact on
the natural environment. The proposed development is not within any designated
European site of natural environment conservation or protection, it is not located within a
National Park, a National Scenic Area a SSSI or RAMSAR site, or a National Nature
Reserve. Neither is it located within a site designated as a local nature conservation site
or landscape area or within an area identified as wild land. 
The proposed development is therefore considered to be in accordance with NPF4
Policy 4 as underpinned by LDP Policies LDP 3 and SG LDP ENV 1 and 71 of pLDP2. 
5.5. NPF4 Policy 7 – Historic Assets and Places 
NPF4 Policy 7 seeks to protect and enhance historic environment assets and places, and
to enable positive change as a catalyst for the regeneration of places. 
Whilst the OBC is not a Listed Building (LB), during the processing of the current planning
application, it came to light that third parties had contacted HES with a request to have
the building listed. 
In their response to the request for listing, HES advised that they had assessed the
property and, from the information available to them, found that the building does not meet
criteria for designation and they decided not to designate the building as a LB. 
HES advised, in summary, that “Built in 1903, the OBC is an example of a small church
designed in a simple gothic style with a standard rectangular plan form.  It has now lost
most of its original interior features. 
The design of the church is typical for small churches of the second half of the 195h and
early 20th centuries and has some good exterior stonework, however it otherwise has no
special architectural details and is very simply laid out to the interior.  Its small scale and
modest design likely reflect the need to keep construction costs low and the relatively
small size of the Baptist community in the area. 
The design of the church is similar to many small rural churches across Scotland and is
not of special interest in design terms.  Later alterations to its interior, including the loss
of pews and replacement timber dado panelling, have also further affected its potential
special architectural interest. 
OBC is a relatively late example of a purpose built Baptist Church with other significant
examples in Scotland surviving from an earlier date.  We have not found the church to be
an early or rare example of its building type or for its particular denomination.  We also do

Page 31

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
not consider it to be an exceptional example in design terms of a small urban church of
the turn of the century. 
While the OBC has a good setting, it does not demonstrate special design quality within
its common building type or for its building date.  It is not a rare or early example of a
purpose built Baptist church or chapel”. 
The detailed report submitted by HES, and details of listing criteria, is published in full on
the planning application file and is available to view via the Public Access section of the
Council’s website. 
Notwithstanding the above, there are two groups of LBs in relatively close proximity to the
application site, Cawdor Place, a terrace of Category B LBs to the north east of the site
and Alma Crescent a terrace of Category C LBs to the west of the site.  Accordingly the
development the subject of this application requires to be assessed for its impact on the
setting of the LBs as follows.   
Part (a) of Policy 7 seeks to ensure that any proposals which are likely to have a significant
impact on historic assets or places are accompanied by an assessment which is based
on an understanding of the cultural significance of the historic asset and/or place. 
The proposed building will not be viewed within the same visual window as Alma Crescent
and therefore it is not considered that it will have any impact on its setting as a LB.  With
regards to Cawdor Terrace, the proposed building will be viewed in relation to the existing
modern buildings surrounding Cawdor Terrace, where it is considered that the
sympathetic design of the building, and its siting working with the existing contours,
together with the muted palette of finishing materials proposed, will ensure that it will not
give rise to any significant adverse impact on the setting of Cawdor Terrace as a LB. 
The proposal will introduce a contemporary designed building within the streetscene
which is considered to be of an appropriate scale, design and finishes which will fit well
within this site which is in an area where there is no distinct architectural style evident with
a varied mix of styles and finishes, some traditional and some more modern buildings of
no particular architectural merit. It is considered that the key to this development working
within this prominent town centre site will be the quality and application of the finishing
materials, boundary treatments and landscaping.  Accordingly, whilst such details as
shown within the application are considered to be acceptable, a condition is proposed on
the grant of permission to secure the finer details of the proposed finishing materials,
landscaping and boundary treatments for approval prior to works starting on site.  A further
condition will be imposed on the grant of condition to secure the reclamation of stone from
the existing OBC building and details of how it will be incorporated into the proposed
development. 
It is not considered that the proposed development will have a significant adverse
impact on historic assets or places consistent with NPF4 Policy 7 as underpinned
by LDP Policies LDP 3 and SG LDP ENV 16(a) and Policy 16 of pLDP2. 
5.6. NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings 
NPF4 Policy 9 seeks to encourage, promote and facilitate the reuse of brownfield, vacant
and derelict land and empty buildings, and to help reduce the need for greenfield
development. 
The development proposed by this planning application represents the sustainable reuse
of a brownfield site situated within the Main Town Settlement Zone of Oban within the

Page 32

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
LDP, where such proposals are directly supported by Policy 9(a) of NPF4 and
underpinned by LDP policies STRAT 1 and LDP DM 1. 
In terms of pLDP2, the site is identified as being within a ‘Settlement Area’ where Policy
01 gives a presumption in favour of redevelopment of brownfield sites where the proposed
development is compatible with surrounding uses; is of an appropriate scale and fit for
the size of settlement in which it is proposed; respects the character and appearance of
the surrounding townscape in terms of density, scale, massing, design, external finishes
and access arrangements; and is in compliance with all other relevant pLDP2 policies.   
However, consideration has to be given to Part (d) of Policy 9 which seeks to secure the
reuse of existing buildings, taking into account their suitability for conversion to other uses
and the need to conserve embodied energy, with demolition regarded as the least
preferred option, but not specifically excluded. 
On this basis, consultation was undertaken with the Council’s Conservation Officer (CO)
who advised that NPF4 Policies 1 and 2 put climate change at the centre of planning
decisions, balanced with other relevant policies as appropriate, noting Policy 9(d) which
cites demolition as the least preferred option.  The CO noted that existing buildings
contain a significant amount of embodied energy and adaptation and retrofit options are
the preferred option with demolition being the least preferred option, albeit in relation to
vacant and derelict buildings.  On this basis the CO advised that the preferred option
would be to demolish the two buildings to the east of the church and design a new
extension to the church to replace these – thereby retaining the historic landmark building
in the town, and providing a compromise in terms of creating one large building that is
suited to the congregation’s requirements but reduce the need for demolition would could
be considered to be in accordance with relevant NPF4 Policies. 
The CO further stated that a less preferred but second option would be to re-use the
existing stone of the church into the new design, rather than disposing of it and bringing
in a new stone cladding as indicated in the application.  The logistical challenges in terms
of modern construction methods would urge that consideration be given to this, to not only
reduce material water, but to retain something of the historic building for the community
and to comply with NPF4 Policy 14 in terms of distinctiveness, which is discussed in more
detail below. 
As result of the comments from the CO, ongoing discussions took place with the Agent
regarding the proposed development and how the decision for demolition had been
arrived at.  The following finalised information was provided regarding the proposed
development. 
“Building Fabric: Regarding the building fabric, a visit to the building reveals the
deficiencies that the church has had to contend with over the past few years. Indeed,
working with or inhabiting an older building exposes the daily inefficiencies and ongoing
maintenance issues inherent in such structures, particularly through the winter months. 
Options Appraisal: The decision to favour the demolition of the building was reached
after assessing multiple policy factors outlined in NPF4 policy guidance. We note the
reference to the cost of the project not being a factor in consideration. For community
projects like this one, costs are a critical factor, encompassing both construction expenses
and project development. Moreover, ongoing operational costs are particularly crucial for
a voluntary group dedicated to serving and meeting the broader needs of the local
community. As previously noted, retaining an existing building entails significant
construction costs, subject to an additional 20% VAT, along with ongoing high operational
and maintenance costs, imposing a substantial burden and liability on the facility. It's

Page 33

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
essential to highlight that this facility is initiated and managed by a community group,
funded by personal donations and limited grants. The decision to propose the current plan
stems from extensive community consultation, where various options for retention and
demolition were weighed against sustainability and community factors outlined in the
planning statement. While the conservation department understandably places a
significant emphasis on preservation (and non-demolition), it is necessary to balance this
with additional community factors, such as disabled access, sustainability, functionality,
and cost. 
NPF4: It's noted that whilst demolition is not the preferred option it is still an option
permitted within the policy. It's crucial to clarify that the church and its decision-making
process have had to consider all factors, not just conservation and demolition, to align
with the full planning framework and all other NPF4 policies addressed by this proposal.
Furthermore, it's important to mention that the building earmarked for demolition does not
hold any significant protected status, such as being listed or located within a conservation
area. This fact further diminishes concerns regarding the proposal's alignment with
national planning policy”. 
Whilst the consultation comments submitted by the CO make a valid argument in relation
to the requirements of NPF4 Policy, it should be noted that there is nothing in planning
terms that would prevent the Applicant from simply demolishing the existing buildings
given that they are neither Listed Buildings or located within a Conservation Area, and
are not “qualifying buildings” for the purpose of Class 70 of the Town and Country
Planning (General Permitted Development (Scotland) Order 1992 (as amended) (GPDO)
and therefore demolition works could benefit from ‘deemed permission’ without the
requirement for any notification to and approval from the Council as Planning Authority. 
Whilst there is a clear expectation set out in NPF4 Policy 9(d) that demolition is the least
preferred option it is neither expressly presumed against nor has the Scottish Government
made any legislative change to the GPDO that would preclude demolition being
undertaken and then planning permission being sought afterwards. In this respect it is
confirmed that the demolition of the building is development which, on its own, would
benefit from ‘deemed permission’ under the provisions of Class 70 of the Town and
Country Planning (General Permitted Development (Scotland) Order 1992 (as amended)
(GPDO), and as such is a matter outwith the direct control of the Council as Planning
Authority. 
The applicant has been provided with additional opportunity to demonstrate that there is
appropriate justification within the context of NPF 4 Policy 9(d) to support the demolition
proposed. Whilst the applicant has failed to satisfactorily demonstrate this case it must
also be acknowledged that the proposal to redevelop the site is otherwise viewed to be
consistent with all other relevant provisions of the Development Plan, and on the basis
that the applicant does not in this instance require express permission from the Council
in order to undertake demolition works, it is considered that it would be unreasonable to
withhold permission solely on the basis of failure to satisfy NPF 4 Policy 9(d).   
Whilst the site proposes the reuse of brownfield land, which is directly supported by NPF4
Policy 9(a), consideration has to be given to the Policy and SG contained within the
adopted LDP and emerging pLDP2 with regards to the demolition of the existing buildings. 
With regards to the adopted LDP, whilst Policy SG LDP ENV 21 seeks to secure
opportunities for the enhancement and re-use of existing buildings through proposals for
re-building, re-use or change of use, to maintain the fabric of the building and its value to
the community, this policy does not prohibit demolition.

Page 34

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
In terms of pLDP2, as detailed above, the site is identified as being within a ‘Settlement
Area’ where Policy 01 gives a presumption in favour of redevelopment of brownfield sites. 
With regards to the reuse of existing buildings, Policy 04 of pLDP2 seeks to make efficient
use of vacant and/or derelict land including appropriate buildings maximising the
opportunities for sustainable forms of design including minimising waste, reducing carbon
footprint and increasing energy with Policy 05 seeking the retention of existing buildings
which contribute to the character and identity of the wider area retained and integrated
into the design unless it has been clearly demonstrated that it is not practicable.  Policy
09 seeks to secure sustainable design and construction methods in terms of embodied
energy; conversion, reuse and adaptability with Policy 11 seeking to reuse materials
wherever practical and retain features of particular architectural or historic interest. 
In this instance, as detailed above, the buildings are not subject to any statutory protection
which would prohibit their demolition.  The proposal to demolish the existing three
buildings on the site to allow for the redevelopment of a new purpose built facility to serve
the needs of the OBC, which has been sympathetically designed for the site, is considered
to be an appropriate development.  Suitable conditions would be imposed on the grant of
permission to secure that reclaimed stone from the church building is incorporated into
the proposed building which would, in part, address the concerns expressed by the CO
and the requirements of NPF4, LDP and pLDP2 Policies. 
Policy 9(b) of NPF4 aligns with the settlement strategy of the LDP and subject to a
minor departure to Part (d) of NFP4 Policy 9, the current development proposal
raises no issue of conflict. 
5.7. NPF4 Policy 12 – Zero Waste 
NPF4 Policy 12 seeks to encourage, promote and facilitate development that is consistent
with the waste hierarchy as defined within the policy document. 
The development the subject of this planning application seeks to establish a replacement
church/community building.  Whilst this is a development which will generate waste when
operational, it will benefit from regular waste uplifts by the Council and will be expected
to comply with our adopted and enforced recycling and reuse strategy and the
requirements of the EHS with regards to waste from the kitchen facilities.  Notwithstanding
this, it is considered appropriate to impose a condition to secure a statement addressing
the requirements of Part (c) of Policy 12 to ensure compliance.   
With regards to the requirement in Part (a & b) of Policy 12 to reuse materials and
minimise demolition and salvage materials for re-use, it is proposed to impose a condition
on the grant of permission to secure a scheme for the reuse of the stone salvaged from
the church building within the proposed development. 
With conditions to secure a waste management statement and scheme for the use
of reclaimed materials from the demolition, the proposed development is
considered to be in compliance with NPF4 Policy 12 as underpinned by LDP
Policies LDP 10 and SG LDP SERV 5(b) and Policy 63 of pLDP2. 
5.8. NPF4 13 – Sustainable Transport 
NPF4 13 seeks to encourage, promote and facilitate developments that prioritise walking,
wheeling, cycling and public transport for everyday travel and reduce the need to travel
unsustainably.

Page 35

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
The development the subject of this planning application does not propose a vehicular
access or off street parking provision, instead it is proposed to utilise existing town centre
parking.  It is not considered that the proposed development will be a significant travel
generating use and is therefore in accordance with Policy 13(c), 13(d) or 13(f) 
As detailed above, the site is currently occupied by three existing buildings, with no
existing access or parking provision.  The application is seeking to secure permission to
demolish the existing buildings to facilitate the construction of a purpose built
church/community facility. 
On this basis, given the town centre location of the site; the provision of existing town
centre parking provision; the proximity to the transport hub (bus, train and rail); and the
existing use of the site; the current proposal, which will also utilise existing town parking
provision, is considered to be acceptable.   
In addition, in their response to the application, the Roads Authority raised no objection
to the proposed development but did highlight the need for a Traffic Management Plan
(TMP) for the construction period of the proposed development to ensure no adverse
impact on the public road network arises. 
With a condition to secure the submission of a TMP for the construction phase of
the proposed development, as requested by the Roads Authority, the proposal is
considered to be acceptable in terms of NPF4 Policy 13 as underpinned by LDP
Policies LDP 11, SG LDP TRAN 2, SG LDP TRAN 4 and SG LDP TRAN 6 and Policies
35 and 40 of pLDP2. 
5.9. NPF4 Policy 14 – Design, Quality and Place 
NPF4 Policy 14 seeks to encourage, promote and facilitate well designed development
that makes successful places by taking a design-led approach and applying the ‘Place
Principle’. 
Policy 14(a) seeks development proposals to be designed to improve the quality of an
area whether in urban or rural locations and regardless of scale with Part (b) giving
support to proposals where they are consistent with the six qualities of successful places. 
With regards to Part (a), the new building is a contemporary designed, split-level structure
which presents as a single storey mono-pitched roof structure to Albany Street with a two
storey pitched roof element presenting to Shore Street.  The proposed building is to be
finished in mix of render, natural stone cladding and timber cladding on a basecourse of
smooth brick with the roof finished in an Anthracite grey coloured metal cladding.  Whilst
the application proposes the use of natural stone cladding, the Planning Authority will
seek the stone reclaimed from the existing OBC building to be incorporated into the
proposed development. 
It is considered that the proposed building is of an appropriate scale, design and finishes
which will fit well within this site which is in an area where there is no distinct architectural
style evident with a varied mix of styles and finishes, some traditional and some more
modern buildings of no particular architectural merit.  The reuse of reclaimed stone from
the church building will help reinforce the local identity.
With regards to the six qualities of successful places set out in Part (b) as follows:
Healthy: Supporting the prioritisation of women’s safety and improving physical and
mental health;

Page 36

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Pleasant: Supporting attractive natural and built spaces; 
Connected: Supporting well connected networks that make moving around easy and
reduce car dependency; 
Distinctive: Supporting attention to detail of local architectural styles and natural
landscapes to be interpreted, literally or creatively, into designs to reinforce identity; 
Sustainable: Supporting the efficient use of resources that will allow people to live, play,
work and stay in their area, ensuring climate resilience, and integrating nature positive,
biodiversity solutions; 
Adaptable: Supporting commitment to investing in the long-term value of buildings,
streets and spaces by allowing for flexibility so that they can be changed quickly to
accommodate different uses as well as maintained over time. 
The proposed redevelopment of the site would provide much improved facilities to serve
OBC through the provision of a purpose built, attractively designed and finished, well
insulated building with suitable access for all within the main town centre of Oban. The
site is within a close proximity to the transport hub and a wide range of local services. 
The provision of a suitably sited, design and finished building is considered to comply with
the broad aims of NPF4 Policy 14 as underpinned by LDP Policies LDP 9 and SG LDP
Sustainable Siting and Design Principles and Policies 05, 08, 09 and 10 of pLDP2. 
5.10. NPF4 Policy 18 – Infrastructure First 
NPF4 18 seeks to encourage, promote and facilitate an infrastructure first approach to
land use planning, which puts infrastructure considerations at the heart of placemaking. 
The development the subject of this planning application proposes connection to the
existing public water supply and drainage infrastructure in the control of Scottish Water. 
In their response to the application Scottish Water raised no objection to the proposed
development which will be serviced from the Tullich Water Treatment Works and the Oban
Waste Water Treatment Works.  Scottish Water do however advise that further
investigations may require to be undertaken once formal applications for connection to
their infrastructure is submitted to them for consideration.   
The proposed water and drainage infrastructure to serve the proposed
development is considered to be consistent with the broad aims of NPF4 Policy 18
as underpinned by LDP Policy LDP DM 11 and Policies 04 and 08 of pLDP2. 
5.11. NPF4 Policy 22 – Flood Risk and Water Management 
NPF4 Policy 22 seeks to strengthen resilience to flood risk and to ensure that water
resources are used efficiently and sustainably. 
As detailed above the development the subject of this planning application proposes a
connection to the public water supply network to which Scottish Water has not objected. 
The management of rain and surface water at the site would be managed through the
provision of a sustainable drainage system, details of which can be adequately secured
through the use of a planning condition. The proposed site is not within any defined flood
risk area.

Page 37

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
With a condition to secure the incorporation of a sustainable drainage system the
proposed development is considered to be consistent with NPF4 Policy 22 as
underpinned by LDP Policies LDP 10, SG LDP SERV 2 and Policy 61 of pLDP2. 
6. Other Considerations 
6.1. Background and Community Engagement 
The application is accompanied by a Supporting Statement (SS) that outlines how the
proposal subject of the current planning application was reached.  The following
represents a summary of the SS with the full SS published in full on the planning
application file available to view via the Public Access section of the Council’s website. 
The SS outlines that the OBC has found its congregation increasing over the last decade,
with a congregation of approximately 120 people post-covid and a seating capacity of
approximately 75 chairs.  The SS details that it was evident as early as 2016 that
significant redevelopment was necessary to meet the needs of the congregation.  The SS
outlines that the OBC have been actively engaged in the community for generations.  In
addition to being a place of worship, the SS outlines that the OBC has a wide range of
direct initiatives including Noah’s Ark; a school uniform bank and also actively engages
and supports other initiatives in Oban such as Hope Kitchen, Hope2Oban and
GreenShoots. 
The SS outlines that the existing OBC premises are split over three buildings, none of
which can adequately accommodate their numbers and, with the age of the buildings,
they have become in need of significant modernisation, structural attention and in the
case of the hall, total redevelopment.   The SS details that as the existing buildings can’t
meet the needs of the OBC, the decision for a complete redevelopment was deemed to
be the most sensible. 
The SS outlines that “The vision for OBC in the decade ahead is that we can increasingly
become an integral part of the community of Oban, given our historic and existing activity,
reputation, growing congregation and engagement with such a diverse range of
community groups and families. A redeveloped site would enable us to not only fulfil our
current activities more effectively, but it would open up opportunities for the Minister,
Leadership Team, Congregation and numerous incredible Volunteers to serve the
community they love with purpose-built facilities fit for our day”. 
The SS details that a community consultation was undertaken to engage as widely as
possible with the local community.  The community consultation process comprised an
Open Day which was advertised in the local press, social media and via word of mouth
and which was followed up by an online survey over a period of six months online.  Full
details of the survey results are available within the full SS. 
6.2. Public Representation 
The application has been subject to 12 objections, 1 representation and 48 expressions
of support. 
Of the 12 objectors, according to information submitted by the Applicant, none are within
the congregation of the OBC. 
The Oban Community Council recognise that the needs of the church congregation
should be afforded a higher priority than the concerns regarding the loss of the building,
both on historic and sustainability grounds.

Page 38

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
It is not considered that the objections raise any complex or technical issues that have
not been addressed in the current Report of Handling. 
The determining factor in the assessment of this application is whether the demolition of
the existing three buildings to allow for the redevelopment of a new purpose built facility
to serve the needs of the OBC is consistent with the provisions of the adopted National
Planning Policy as underpinned by the LDP and whether the issues raised by third parties
raise material considerations of sufficient significance to withhold planning permission. 
In this instance, as detailed above, whilst there is a clear expectation set out in NPF4
Policy that demolition of buildings is the least preferred option, it is neither expressly
presumed against nor has the Scottish Government made any legislative change to the
GPDO that would preclude demolition being undertaken and then planning permission
being sought afterwards. 
In light of the above, whilst current application is being advanced on the basis of
demolition and rebuild, which requires to be considered as a whole, given the conflict
between the proposal, the GPDO and the intent of NPF4, it is not considered reasonable
to withhold permission for the redevelopment of the site. 
7. Conclusion 
As a minor departure to NPF4 Policy 9, with regards to the demolition of the existing
building, the proposed development is considered to be otherwise consistent with the
provisions of the adopted National Policy as underpinned by the LDP with the issues
raised by third parties not amounting to material planning considerations that have not
been addressed through the processing of the planning application. 
Accordingly the application is recommended for approval subject to conditions.