North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  EK/KS/VR Date 08/06/23 
5 Year Medium Term Financial Plan 2024/25 to 2028/29 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail kempe@northlan.gov.uk Telephone  07939 280601 
Executive Summary
This report provides an interim update on the five-year financial forecast.  It outlines the
challenges faced by the Council in maintaining medium term financial stability, whilst
achieving the strategic priorities of the Council. 
Taking the approved 2023/24 budget as the new baseline, this plan updates financial
planning assumptions focussing on those factors which have the greatest potential to
impact the Council’s forecast financial position in the medium term.  This includes future
revenue grant funding, pay and non-pay inflation.  A range of risk-based scenarios have
been considered, resulting in envisaged, pessimistic and optimistic positions, as set out in
Appendices 1 to 3.   Whilst the envisaged scenario remains the most appropriate for
planning purposes, it is important to note the budget gap range, reflecting other potential
scenarios the Council may face.   
Table 1 below includes the optimistic and pessimistic scenarios and demonstrates the
volatility and the extent of the fluctuation possible over the period of this plan.  The
summary forecast Council envisaged position, indicates a budget gap of £108.138 million
over the planning period and £63.878 million for the three-year budget period, 2024/25 to
2026/27.  Reflecting the other planning scenarios, the budget gap is estimated to range
between £54.426 million and £231.261 million over the five-year period, and £32.582
million and £135.763 million over three years.   
Financial
Year
Budget Gap
Optimistic
(£000)
Budget Gap
Envisaged
(£000)
Budget Gap
Pessimistic
(£000)
2024/25 20,537         30,458         54,263        
2025/26 3,995           14,660         38,154        
2026/27 8,050           18,760         43,346        
2027/28 12,292         23,320         48,458        
2028/29 9,552           20,940         47,040        
Total 54,426         108,138       231,261      
3 Year Gap 32,582        63,878        135,763     
General Fund
Table 1

Page 2

Background  
1.1. Longer term planning is integral to the Council’s Financial Strategy and the strategic
approach to budgeting. The key principles and framework of the approved Revenue
Resources Budget Strategy underpin the financial plan and facilitate a robust and
strategic approach to financial planning.   Effective decision making relies on robust
financial planning and the Medium Term Financial Plan (MTFP) assists in ensuring
resources are aligned to the key priorities outlined in The Plan for North Lanarkshire
and that the Programme of Work is affordable and sustainable.  Elected Members
require robust information to support decision making to ensure medium term financial
sustainability for the Council. The MTFP reflects the financial risks that may impact on
the Council’s ability to continue to provide high quality services focussing on the
strategic priorities, whilst balancing the budget.   
1.2. This plan continues to consider a range of scenarios and highlights the associated
forecast budget position.  Taking the 2023/24 approved budget position as the new
baseline, updates to financial planning assumptions, mainly in relation to future funding
and increased cost pressures arising from pay and non-pay inflation, are reflected in
this plan.  A range of risk-based outcomes are modelled highlighting optimistic,
envisaged and pessimistic scenarios.  In previous years, the two main variables with
the greatest potential to impact financial plans and the Council’s ability to set a balanced
budget have been the level of funding provided by the Scottish Government and pay
inflation.  However, with more recent material adverse impacts of non-pay inflation and
rising energy costs, this plan continues to recognise the risks and volatility, to forecast
the potential financial implications. Therefore, whilst the envisaged scenario remains
In line with the principles of the Revenue Resources Budget Strategy, the Council will work
towards finding solutions to address the potential budget gap and ensure its statutory
obligation to set balanced budgets are met.  As outlined at 2.29 part of the solution may
include a £4.500 million saving arising from a review of the PPP affordability model, which
will reduce the 2024/25 gap to £25.958m, and the five year gap to £103.638 million
(£59.378 million over the three year budget period), prior to any consideration of Council
Tax increases, additional savings actions or other potential solutions to manage the budget
gaps. 
Recommendations
It is recommended that the Policy Strategy Committee: 
(1) Acknowledges the updated Medium Term Financial Plan 2024/25 to 2028/29.
(2) Acknowledges that this plan will be subject to ongoing review with an update
reported to the Policy and Strategy Committee in September 2023. 
(3) Recognises, as per paragraph 2.31, engagement with elected members is required
to ensure options to address the budget gap in each financial year are identified, to
enable the Council to set a balanced budget. 
(4) Approves the PPP affordability review saving identified at paragraph 2.29. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning

Page 3

the most appropriate for planning purposes, it is important to note the budget gap range,
reflecting the other potential scenarios the Council may face.   The envisaged,
pessimistic and optimistic scenarios are shown in Appendices 1, 2 and 3, respectively,
demonstrating the volatility and the extent of the fluctuation possible over the period of
this plan. 
1.3. The Scottish Government published its Resource Spending Review in May 2022, which
set out high level parameters for future Scottish budgets up to 2026/27. This identified
a flat lining of resource funding for Local Government at 2022/23 levels, over the next
three financial years, with a small increase forecast in 2026/27. However, the 2023/24
Scottish Budget provided some additional resources for local government on top of
funding for additional responsibilities and policy commitments.  This plan continues to
assume a flat lining of funding resource, as indicated in Scottish Government’s
Resource Spending Review 2022. It is, however, anticipated that an updated
Resources Spending Review will be published in May 2023. 
1.4. In addition, the Scottish Government’s commitment to establishing a National Care
Service has resulted in further financial uncertainty in respect of Adult Social Care
services and local government as a whole.  Continuing the approach taken in 2023/24,
it has been agreed through collaborative working that financial pressures facing adult
social care services provided to the IJB will be managed by the IJB through use of
reserves or implementation of savings where necessary. Therefore, the Council’s
MTFP continues to exclude any potential future financial impacts of providing Adult
Social Care Services in the overall Council financial planning position. Members
should, however, note that finance teams across both the Council and IJB will continue
to work closely to monitor this position.     
1.5 It is considered that a five year medium term plan remains reasonable and appropriate
for financial planning purposes.  
1. Report 
2.1 The previous MTFP approved by this Committee in September 2022 indicated a three
year gap for the period 2024/25 to 2026/27 of £53.800 million (2024/25, £20.620
million, 2025/26 £16.300 million and 2026/27 £16.880 million).  This plan is updated for
the approved 2023/24 budget decisions along with other relevant key changes,
recognising the impact these may have on the demand for services, resources, and
other cost pressures. 
2.2 Appendices 1 to 3 provide summaries for three planning scenarios across the five year
planning period, highlighting the anticipated budget gap for the three year budget
period 2024/25 to 2026/27.  Whilst three planning scenarios have been presented
reflecting sensitivities and volatility in forecasting, the remainder of this report primarily
focuses on assumptions in relation to the envisaged scenario.  These are contained
within sections 3 and 4 below, with a summary of the movements since the previous
plan provided at Appendix 4.   
Forecast Resources 
2.3 The largest element of the Scottish Budget is the Scottish Block Grant provided by the
UK Government through the Barnett formula. The UK Spending Review is the process
by which the UK Government sets out its plans for public spending.  This provides vital
information for the Scottish Government’s planning assumptions and budget.  The UK
Autumn Statement 2022 was published in November 2022 when inflation had recached
its highest level since 1981, the statement announced £1.5bn of additional funding for

Page 4

the Scottish Budget. However, the Spring Statement in March 2023 provided an update
on the economy, OBR forecasts and progress since the Autumn budget, highlighting
an overall expected fall in inflation over the medium term.  The next spending review is
anticipated in the Autumn. Therefore, it should be noted that there is the potential for
adjustments to both UK and Scottish Government budgets, potentially impacting this
plan. 
2.4 As outlined in 1.3 above, whilst the Scottish Government’s Resources Spending
Review indicates flat cash settlements for Local Government for 2024/25 and 2025/26,
with a minor increase in 2026/27, there is insufficient detail to give clarity and certainty
over funding at individual Council level and whether this funding will come with
additional spending commitments.  In addition, other variables and uncertainties may
impact on this position including the Scottish Government’s commitment to support
priority areas such as health, care, education and children, with the potential to impact
on funding levels for Local Government. 
Aggregate External Finance (AEF) 
2.5 The Council’s revenue funding consists largely of government funding, Aggregate
External Finance (AEF), which equates to approximately 81% of the total funding, and
is made up of General Revenue Grant, Specific Grant and Non Domestic Rates
Income, based on the Scottish Government’s assessment of overall spending needs. 
2.6 As previously noted, estimating future years’ funding with any degree of certainty is
challenging, and a slight variation on funding level can have a significant impact on the
Council’s forecast financial position (1% equates to c. £8.000 million). 
2.7 All three scenarios have been re-baselined to reflect the 2023/24 AEF as reported in
the approved 2023/24 budget.  The envisaged scenario assumes no movement in the
re-baselined 2023/24 core grant for the duration of this plan i.e. flat cash, as indicated
in the Scottish Government’s Resource Spending Review.  The optimistic and
pessimistic scenarios have been flexed to 1% increase/decrease respectively.   
Council Tax 
2.8 Income from Council Tax accounts for around 17% of the Council’s revenue resources
with the estimated income based on a combination of Band D equivalent value,
householder base and the expected rate of collection. 
2.9 In setting the 2023/24 budget, the Council approved a 5% increase increasing a Band
D charge to £1,320.78. 
2.10 This plan continues to reflect increased Council Tax income from growth in the number
of households.  However, it should be noted the Community Investment Fund is made
up of funding from ring-fencing future growth in Council Tax income from regeneration
activities and the Council’s ambition, along with 1% of future increases in Council Tax
charges. Therefore, this plan continues to reflect the commitment to increase Council
Tax by 1% to support the Community Investment Programme. This provides £9.110
million of additional resources over the five year planning period and £5.310 million
over the 3 year budget period. Further increases in Council Tax rates will be a decision
for Elected Members and will be considered as part of the budget setting process. 
Sales, Fees and Charges

Page 5

2.11 One of the key principles of the Revenue Resources Budget Strategy is that future
charging models for services will be informed by benchmarking and the principles of
full cost recovery where appropriate.  To assist with moving towards full cost recovery
and in recognition of inflationary impacts affecting costs for services, the plan assumes
additional income generation for discretionary sales, fees and charges of £0.500 million
in 2024/25, uplifted by 3% each subsequent year.  The optimistic and pessimistic
scenarios assume a slightly adjusted base for 2024/25 of £0.750 million in 2024/25 and
£0.250 million, respectively. 
2.12 As previously advised a Sales, Fees and Charges policy is under development to assist
in setting appropriate charges for services provided.  This policy will be informed by a
review by Services to analyse discretionary fees and charges and the extent to which
full cost recovery is being achieved.  The output of this review will be reported to the
next meeting of this Committee, together with a recommended policy in respect of
future fee uplifts and will inform income generation forecasts to be reflected in future
iterations of this plan. 
Use of Reserves / Resources 
2.13 The Revenue Resources Budget Strategy allows for prudent and controlled use of
balances, with the Change Management Fund supporting the one-off costs of approved
budget savings. In recent years, and in line with the Reserves Policy, Council has
utilised one-off resources to support multi-year budgeting as well as allowing time to
develop and implement savings over time, or to resource one-off service
enhancements.  This plan recognises the reversal of the 2023/24 one-off use of
reserves of £10.700 million in 2024/25, which was approved to manage the forecast
energy burden, due to the real uncertainty in respect of the recurring cost to the Council. 
Further details in respect of this are provided in 2.17 and 2.24 below. 
Forecast Expenditure Requirements 
Employee Cost Pressures 
2.14 Employee costs remain the largest single element of the General Fund budget,
accounting for around 54% of General Fund budgeted expenditure in 2023/24.   Cost
pressures linked to the workforce are therefore material and a key variable which has
the potential to impact significantly on the forecast plan.  Information relating to recent
and ongoing pay awards, as well forecast future employee cost pressures is outlined
below. 
2.14.1 Pay Award – Single Status
The 2022/23 pay award for non-teaching staff increased the baseline budget
from 2023/24 and therefore the cost of future years’ pay.  The negotiations on
the 2023/24 pay award are ongoing.  At this stage, the Scottish Government
has committed to provide local authorities with £155.000 million in recurring
funding to support the pay award for 2023/24.  This plan currently assumes that
the Council’s previous provision for pay awards will be sufficient to meet the
cost of the 2023/24 award.  However, this will be kept under review as the
negotiations progress.   Should there be a shortfall in funding this will be
considered in the next update to the plan. 
2.14.2 Pay Award – Teachers

Page 6

The negotiation for the 2022/23 teachers’ pay resulted in a 28 month deal, to
the 31 July 2024, with the pay year moving to an academic year thereafter.  The
pay agreement is fully funded through a combination of Council resources and
additional Scottish Government funding. The impact of adjusting the baseline
to reflect this settlement has increased the forecast cost of pay awards in future
years.  However, as a result of the change to an academic year, there is a one-
off reduction in the cost to the Council in financial year 2024/25, as the cost for
the period 1 April to 31 July 2024 is already met from the previous award and
funding package.   
2.14.3 Pay Award – Future Years Summary 
For the period of this plan, future pay awards are based on the Scottish Fiscal
Commission’s forecast average earnings increases, as at December 2022. 
This is deemed to reflect the element of pay expected to be funded by the
Council.  Reflecting these forecasts uplifts and the impact of re-baselining, a
total of £11.500 million pay award provision is estimated for 2024/25.  Total
provision over the next 3 years is anticipated to be £38.300 million.  The
optimistic scenario assumes pay awards will cost the Council 0.5% less than
the envisaged scenario, whilst the pessimistic scenario assumes a 2.5%
increase on the envisaged assumption, thus providing a range for potential pay
award of £9.200 million to £23.000 million in 2024/25 or between £30.300
million and £79.700 million over the next 3 years.  Pay award assumptions will
remain under review as negotiations continue, and financial outlooks will be
updated, as appropriate.   
Non Pay Inflationary Pressures 
2.15 Historically a non-pay inflationary uplift has generally only been provided where it was
deemed material and contractual in nature, based on forecast relevant inflationary
indices.  This continues to be the case in this update to the MTFP.  However, it was
previously acknowledged that the challenging financial economic climate, with high
inflation and significant increases in energy costs, would result in Services being unable
to manage within budgets for which no inflationary uplift was provided.   Therefore,
additional budgetary provision of £8.127 million has been provided to Services to reflect
inflationary pressures anticipated during 2023/24, along with the £5.885 million in-year
contract inflationary provision.     
2.16 As a result of the above, this five year forecast is based on a higher baseline position,
with the projections for this planning period based on most recent forecasts by the OBR
and Bank of England (BoE), which show inflation levels falling significantly over the five
years. Therefore, this plan provides for contract inflationary pressures of £1.390 million
in 2024/25 and £11.200 million in total over the period of the plan.   
2.17 As previously reported the significant rise in energy costs has resulted in increased cost
pressures for the Council.  Committee will recall a further provision of £10.700 million
was provided for 2023/24 in the previous MTFP.  However, the budget report to the
Council on 23 February recognised the real uncertainty in respect of the recurring cost
to the Council.  Therefore, it was agreed to use one-off balances to manage this position
in 2023/24, but there was an assumption a recurring budgetary provision would be
required from 2024/25 onwards.  Following further analysis of costs and consumption
it is deemed reasonable to assume this additional burden is indeed recurring.  In
addition, projections indicate there are further upward pressures on energy budgets
into 2024/25 and beyond.  This plan, therefore, provides for additional costs of £2.300

Page 7

million in 2024/25.  The budgetary requirements for future years will be kept under
review with an update provided in future MTFP updates.   
2.18 Other inflationary pressures in respect of non-domestic rates increases from 2024/25
onwards have also been reflected totalling £1.670 million across the five years. 
Other Cost Pressures  
2.19 Other cost pressures totalling £8.370 million over the five years are also provided for
in this plan. This predominantly relates to previously reported burdens within Education,
Children & Families, which are subject to ongoing review. Also included are anticipated
increased costs of the Council Tax Reduction Scheme. 
Other Commitments 
2.20 There is provision for loan debt costs in relation to the Community Investment
Programme, including City Deal, which equates to £2.490 million in year 1 of the plan
and £14.850 million across the planning period. 
2.21 In addition, this plan recognises that the updated forecast loan charge costs when
compared with existing budgetary provision, indicates there is a requirement to
increase the budget commencing in 2024/25, mainly as a result of previously approved
non-recurring loan debt re-profiling savings and increased interest rate costs. 
However, the plan also recognises the uncertainty in forecasting precisely when the
budget will be required due to a number of factors, including the spend profile of the
capital programme.  Therefore, the plan smooths the overall increased budgetary
requirement over a longer period. As a result, there may be a requirement to draw on
unallocated balances in the event that there is insufficient budget in any one year of
the plan.  An earmarked reserve will be established for this purpose as part of the
2023/24 year-end closedown.  Thus, an additional recurring £1.000 million has been
provided for in 2024/25 and a total of £8.700 million over the planning period.   
Updated Medium Term Financial Forecast 
Approved Savings / Advance Action 
2.22 In line with the Revenue Resources Budget Strategy and the commitment to consider
a three year rolling revenue budget, 3 years of base budget adjustments were approved
by Council on the 23 February 2023.  These savings result in minor savings of £0.472
million for 2024/25 and £0.210 million for 2025/26.     
2.23 This plan assumes all other previously approved savings will be fully achieved. 
Committee should note that updates in this regard will be provided to future meetings
and amendments to the Financial Plan will be made accordingly. 
Strategic Use of Balances 
2.24 Members will recall the approved budget set in February 2023 agreed savings of
£7.614 million, with £0.639 million to be achieved in 2023/24, and £3.575 million and
£3.400 million to be delivered in 2024/25 and 2025/26 respectively.  The timing and
delivery of the savings required one-off use of balances of £10.375 million across
2023/24 and 2024/25, which is recognised in this plan.

Page 8

2.25 The Council’s unallocated balances will continue to be closely monitored and may be
made available to support and manage unresolved budget gaps in this five-year
planning period, in line with the Council’s Reserves Policy.  The call on these balances
is unknown at this time and will be given due consideration as part of the ongoing
budget process. 
Summary – Medium Term Financial Forecasts 
2.26 The envisaged scenario indicates a budget gap of £108.138 million over the five year
planning period and £63.878 million for the three year budget period 2024/25 to
2026/27.  Further details are contained within Appendix 1.  Appendices 2 and 3,
summarise the forecast pessimistic and optimistic scenarios indicating the gap could
range between £54.426 million and £231.261 million, over the five years. 
2.27 Appendix 4 provides a high level summary of the movements between this plan and
the previous plan reported to Committee in September 2022. 
Proposed Additional Advance Action 
2.28 The Accounting for Service Concessions report to the Council on 23 February 2023
sought agreement to change the accounting methodology in respect of existing service
concessions (PPP arrangements), which resulted in a budget saving of £4.000 million. 
However, as indicated in the report, this change in accounting methodology does not
represent a saving over the life of the asset. The total charges to the general fund
revenue over the asset lives remain unchanged, which means the Council will have to
ensure there is adequate budgetary provision in the future to meet all costs. Thus,
requiring consideration as part of the Council’s future financial plans.  Hence the report
advised that detailed modelling was required to forecast future costs and funding to
assess the affordability and sustainability of the saving. 
2.29 The review of the PPP financial model has been undertaken to demonstrate
affordability and sustainability.  The updated model also reflects the future changes
previously highlighted in respect of implementing the new accounting standard,
IFRS16, which the Council currently plans to adopt in 2024/2025.  The review confirms
the robustness of the model and the funding in place to meet the future financial
obligations of these establishments.  As anticipated, there is a short to medium term
financial benefit arising from implementing IFRS16.  Therefore, it is reasonable to
assume a saving of £4.500 million for the five years of this plan.  Thereafter, additional
budgetary provision will have to be incorporated into future MTFPs or through
additional one-off earmarked reserve provision, to reflect the fact that both the £4.000
million previously approved saving and the further £4.500 million proposed are not
recurring. 
2.30 The £4.500 million saving described above would reduce the 2024/25 gap to
£25.958m, and the five year gap to £103.638 million, prior to any consideration of
Council Tax increases, additional savings actions or other potential solutions to
manage the budget gaps. 
2.31 In line with the principles of the Revenue Resources Budget Strategy, Council officers
will work with Elected Members to ensure options for potential solutions are presented
to enable the Council to address the budget gap in each financial year and to meet its
legal obligation to set a balanced budget.  The newly formed Financial Planning
Advisory Group, with cross party membership, will give full consideration to this
position.  Members decisions will also be informed by the results of engagement with
Community Boards.

Page 9

Risks and Uncertainties 
2.32 Whilst the assumptions applied to income and expenditure projections in this financial
plan are based on the best information available at the time of writing, they are
inherently uncertain.  The key factors which are likely to impact upon the Council’s
assumptions and future financial plans have been discussed throughout the report,
including the significant uncertainty in relation to the Council’s funding settlement,
volatility in assumed inflationary uplifts including those in relation to pay awards.  There
are also a number of political factors which may impact on planning assumptions,
including potential changes at UK and Scottish Government levels as a result of
elections, the Scottish Government’s commitment to a National Care Service and the
financial consequences of this on Local Government, along with climate change
commitments. 
2.33 Other current notable risks previously reported include; 
2.33.1 Ash tree dieback linked to a disease which could cause significant damage to
the UK’s ash population.  As has been previously reported to Committee, there
may be a significant financial cost to managing the diseased species, including
identifying ash trees, assessing their condition and where necessary removal
of trees and a programme of replanting.  The Council has engaged a
contractor to build a proposed action plan to manage the position, which will
include an estimate of the financial implications.  It is anticipated that an update
will be reported to the Environment and Climate Change Committee in August.   
2.33.2 Committee should also be aware that the Scottish Government has delayed
the review of Capital Accounting arrangements and statutory mitigations in
respect of such. Statutory interventions override the CIPFA Code of Practice
for Local Authority Accounting, and the Scottish Government has decided to
review them to make sure they remain fit for purpose.  The independent review
will build upon the work taken forward by Directors of Finance in March 2022
but will also consider the statutory framework for capital accounting. There is
growing concern among Directors of Finance that the aim is to remove the
statutory mitigations, leaving councils exposed to the financial consequences
on revenue budgets and ultimately potentially impacting on capital investment
programmes or create volatility which would have implications for Council
Taxpayers. Should any such changes be proposed, indications are that these
will be applied going forward with transition arrangements put in place.  The
review will now commence in September 2023 for conclusion in April 2025. 
This should give much needed certainty for local authorities, as we manage
the already significant challenging forecast budget gaps. 
Community Empowerment (Scotland) Act 2015 
2.34 This Act requires councils to embed community participation in the design and delivery
of public services, and to build community capacity to give people the skills and
confidence required to be involved, while recognising the particular needs of
communities facing multiple social and economic challenges. In line with previous
financial years the Council will engage in a budget consultation exercise.  The outcome
of the consultation will inform members’ decisions around the solutions to ensure the
Council meets its statutory requirement to set a balanced budget.

Page 10

3. Measures of success 
Measures of success will include: 
3.1 Development of solutions aligned to the Council’s strategic objectives outlined in 
the Plan for North Lanarkshire.
3.2 Setting of a balanced budget for 2024/25 and subsequent years.
3.3 Successful and timeous implementation of approved solutions. 
4. Supporting documents
Appendix 1 Envisaged Scenario
Appendix 2 Pessimistic Scenario
Appendix 3 Optimistic Scenario
Appendix 4 Summary of Movements 
Elaine Kemp
Chief Officer (Finance)

Page 11

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐

Page 12

5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed?

Page 13

Envisaged Scenario Appendix 1
2024/25 2025/26 2026/27 2027/28 2028/29
£000 £000 £000 £000 £000
Anticipated Cost Pressures 20,560 14,270 18,220 22,550 20,140
Pay Award 11,500 12,000 14,800 18,200 15,700
Contract Inflation 1,390 1,150 2,250 3,160 3,250
Energy Costs 2,300 0 0 0 0
NDR Costs 260 330 360 360 360
Other Cost Pressures 5,110 790 810 830 830
Other Commitments 3,490 4,590 4,790 5,290 5,390
Community Investment Fund inc. City Deal 2,490 2,790 2,990 3,290 3,290
Loan charges reprofiling 1,000 1,800 1,800 2,000 2,100
Total Cost Pressures 24,050 18,860 23,010 27,840 25,530
Less:
Resource Forecasts (6,880) 3,990 4,251 4,520 4,590
AEF adjustments - Core 0 0 0 0 0
Reversal of Use of Reserves/Resources in previous year (10,700) 0 0 0 0
1% Council Tax Increase; CIF 1,720 1,770 1,820 1,870 1,930
Net Council Tax Growth 1,600 1,700 1,900 2,100 2,100
Income Generation - Sales, Fees & Charges 500 520 530 550 560
Budget Gap before advanced action 30,930 14,870 18,759 23,320 20,941
Approved Advance Action (472) (210) 0 0 0
Approved Savings 0 0 0 0 0
Approved Base Budget Adjustments (472) (210) 0 0 0
2023/24 Approved Savings now applied (3,575) (3,400) 0 0 0
Use of Reserves for 2023/24 approved savings (3,400) 0 0 0 0
Reversal of use of reserves for 23/24 saving 6,975 3,400 0 0 0
Budget Gap after approved advanced action 30,458 14,660 18,759 23,320 20,941
3 year total (24/25 to 26/27) 63,878
Proposed Advanced Action (4,500) 0 0 0 0
Review of PPP Affordability (4,500) 0 0 0 0
Revised Budget Gap after proposed advanced action 25,958 14,660 18,759 23,320 20,941
3 year total (24/25 to 26/27) 59,378

Page 14

Pessimistic Scenario Appendix 2
2024/25 2025/26 2026/27 2027/28 2028/29
£000 £000 £000 £000 £000
Anticipated Cost Pressures 35,830 29,550 34,640 39,650 38,230
Pay Award 23,000 26,400 30,300 35,100 33,600
Pension Costs 3,900 0 0 0 0
Contract Inflation 2,050 1,840 2,970 3,130 3,210
Energy Costs 2,300 0 0 0 0
NDR Costs 400 450 490 510 510
Other Cost Pressures 4,180 860 880 910 910
Other Commitments 3,880 4,780 4,980 5,380 5,480
Community Investment Fund inc. City Deal 2,880 2,980 3,180 3,380 3,380
Loan charges 1,000 1,800 1,800 2,000 2,100
Total Cost Pressures 39,710 34,330 39,620 45,030 43,710
Less:
Resource Forecasts (15,025) (4,035) (3,726) (3,427) (3,329)
AEF adjustments - Core (7,865) (7,704) (7,626) (7,558) (7,480)
Reversal of Use of Reserves/Resources in previous year (10,700) 0 0 0 0
1% Council Tax Increase; CIF 1,690 1,710 1,730 1,750 1,770
Net Council Tax Growth inc. rebaselining adj in year 1 1,600 1,700 1,900 2,100 2,100
Income Generation - Sales, Fees & Charges 250 260 270 280 280
Budget Gap before advanced action 54,735 38,365 43,346 48,457 47,040
Approved Advance Action (472) (210) 0 0 0
Approved Savings 0 0 0 0 0
Approved Base Budget Adjustments (472) (210) 0 0 0
2023/24 Approved Savings now applied (3,575) (3,400) 0 0 0
Use of Reserves for 2023/24 approved savings (3,400) 0 0 0 0
Reversal of use of reserves for 23/24 saving 6,975 3,400 0 0 0
Budget Gap after approved advanced action 54,263 38,155 43,346 48,457 47,040
3 year total (24/25 to 26/27) 135,763
Proposed Advanced Action (4,500) 0 0 0 0
Review of PPP Affordability (4,500) 0 0 0 0
Revised Budget Gap after proposed advanced action 49,763 38,155 43,346 48,457 47,040
3 year total (24/25 to 26/27) 131,263

Page 15

Optimistic Scenario Appendix 3
2024/25 2025/26 2026/27 2027/28 2028/29
£000 £000 £000 £000 £000
Anticipated Cost Pressures 17,890 11,060 14,910 19,060 16,420
Pay Award 9,200 9,200 11,900 15,100 12,400
Contract Inflation 720 470 1,550 2,430 2,490
Energy Costs 1,300 0 0 0 0
NDR Costs 0 0 0 0 0
Other Cost Pressures 6,670 1,390 1,460 1,530 1,530
Other Commitments 4,390 5,490 5,890 6,390 6,490
Community Investment Fund inc. City Deal 3,390 3,690 4,090 4,390 4,390
Loan charges 1,000 1,800 1,800 2,000 2,100
Total Cost Pressures 22,280 16,550 20,800 25,450 22,910
Less:
Resource Forecasts 1,271 12,345 12,750 13,158 13,358
AEF adjustments - Core 7,861 8,026 8,100 8,189 8,267
Reversal of Use of Reserves/Resources in previous year (10,700) 0 0 0 0
1% Council Tax Increase; CIF 1,760 1,850 1,950 2,050 2,150
Net Council Tax Growth inc. rebaselining adj in year 1 1,600 1,700 1,900 2,100 2,100
Income Generation - Sales, Fees & Charges 750 770 800 820 840
Budget Gap before advanced action 21,009 4,205 8,050 12,292 9,552
Approved Advance Action (472) (210) 0 0 0
Approved Savings 0 0 0 0 0
Approved Base Budget Adjustments (472) (210) 0 0 0
2023/24 Approved Savings now applied (3,575) (3,400) 0 0 0
Use of Reserves for 2023/24 approved savings (3,400) 0 0 0 0
Reversal of use of reserves for 23/24 saving 6,975 3,400 0 0 0
Budget Gap after approved advanced action 20,537 3,995 8,050 12,292 9,552
3 year total (24/25 to 26/27) 32,582
Proposed Advanced Action (4,500) 0 0 0 0
Review of PPP Affordability (4,500) 0 0 0 0
Revised Budget Gap after proposed advanced action 16,037 3,995 8,050 12,292 9,552
3 year total (24/25 to 26/27) 28,082

Page 16

Appendix 4
Summary Movements from Previous MTFP
2024/25
£000
2025/26
£000
2026/27
£000
Total
£000
Gap per approved MTFP September 2022 20,620 16,300 16,880 53,800
Action Approved
Base Budget Adjustments (472) (210) 0 (682)
Use of Balances (reversal) 10,700 0 0 10,700
10,228 (210) 0 10,018
Revised Gap February 2023 30,848 16,090 16,880 63,818
Updated assumptions April 2023
Cost Pressures
Pay Award (800) (600) 1,900 500
Contract Inflation (1,260) (1,660) (850) (3,770)
Energy 1,940 (380) (420) 1,140
Other Cost Pressures (650) 0 0 (650)
Other Commitments 1,000 1,800 1,800 4,600
Resources
Estimated Council Tax Income (120) (70) (20) (210)
Income Generation - Sales, Fees & Charges (500) (520) (530) (1,550)
Revised MTFP Gap 30,458 14,660 18,760 63,878
Proposed Advance Action
Review of PPP Affordability (4,500) 0 0 (4,500)
Revised Gap after proposed advanced actions 25,958 14,660 18,760 59,378