North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref KH/SL Date 16/03/23 
Strategic Policy Framework - annual review and refresh 
From  Katrina Hassell, Chief Officer (Business and Digital)  
E-mail HassellK@northlan.gov.uk Telephone 07903 096 121 
Executive Summary
Since approval of The Plan for North Lanarkshire - and the alignment of the Strategic Policy
Framework - many strategies, policies, and plans have been developed, reviewed and
updated, approved, and implemented to support achievement of the council’s long-term
vision.   
By providing a way to ensure a regular monitoring and review process, the Strategic Policy
Framework has ensured services and activities remain aligned to The Plan for North
Lanarkshire as well as the relevant local and national strategy, policy, and legislative
contexts. 
As much had changed since the Strategic Policy Framework Review Programme was
initially created in 2018 and last submitted to an extensive update, the report to Policy and
Strategy Committee in March 2022 represented the outcome of a significant review
exercise undertaken at that time. 
The 2023 annual review has therefore been more lite touch with the main changes being
reflected in the Review Programme.  Maintenance of this Programme will continue to
ensure that each of the strategies, policies, and plans within the Strategic Policy
Framework are up to date or on a schedule to be updated at an appropriate interval and
reported to the relevant committee for Members’ due consideration and approval. 
This report therefore presents the Policy and Strategy Committee with the refreshed
Strategic Policy Framework in Appendix 1.  Within this, Appendix A provides guidance to
support future development and monitoring processes, while Appendix B sets out the
accompanying Review Programme. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Acknowledge the role of the Strategic Policy Framework in delivering The Plan for
North Lanarkshire, and in ensuring each of the strategies, policies, and plans listed
therein (as noted in Appendix B) are up to date or on a schedule to be updated at an
appropriate interval and reported to the relevant committee, and
(2) Approve the refreshed Strategic Policy Framework and accompanying Review
Programme.

Page 2

1. Background 
1.1 The Plan for North Lanarkshire sets the strategic direction not just for the council and
partners, but for North Lanarkshire as a place.  It outlines the shared ambition to make
North Lanarkshire the place to Live, Learn, Work, Invest, and Visit. 
1.2 The long-term vision in The Plan for North Lanarkshire provides a very clear focus and
compelling narrative in terms of what the council is working towards.  This vision of
inclusive growth and prosperity for all aims to bring equal benefits to all North
Lanarkshire’s communities and ensure a fairer distribution of wealth. 
1.3 Initially approved in September 2018, the Strategic Policy
Framework sits alongside the Programme of Work in the
council’s strategic planning framework to ensure that
strategy and policy remain connected to delivery in support
of the shared ambition (as shown in the diagram on the right).   
1.4 As one of the strategic frameworks supporting The Plan for
North Lanarkshire, the Strategic Policy Framework sets out
the high-level strategies, policies, and plans which are
subject to a formal review process to ensure they remain fit for purpose and continue
to align to the strategy of the council as well as the relevant local and national strategy,
policy, and legislative contexts.  The Framework also aims to ensure that strategies,
policies, and plans are formulated, developed, implemented, monitored, and reviewed
in a consistent and transparent manner across the council.   
1.5 The Strategic Policy Framework has undergone various updates since initially
approved, with the most recent position being reported to the Policy and Strategy
Committee in March 2022.  As much had changed since the Strategic Policy
Framework Review Programme was initially created in 2018 and last subject to an
extensive update, the 2022 process involved a significant review exercise with many
strategies, policies, and plans being updated, others being amalgamated, and some
replaced.   A consultation exercise also informed the refreshed version of the
Framework in 2022.  As such, the 2023 annual review has been more lite touch. 
1.6 Developments over the years within both the Strategic Policy Framework and
Programme of Work meant there had been overlap.  This was resolved in the March
2022 report to the Policy and Strategy Committee when the delineation was made and
strategies, policies, and plans were only included in the Strategic Policy Framework
moving forward. 
1.7 In line with the council’s governance arrangements, the Strategic Policy Framework
Review Programme is scheduled to undergo an annual review with a view to reporting
an updated position to the Policy and Strategy Committee in March each year.  This
report herewith therefore updates on the conclusion of the 2023 review and presents
the updated Strategic Policy Framework and its accompanying Review Programme for
Member’s approval. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements

Page 3

2. Strategic Policy Framework 
2.1 The Strategic Policy Framework Review Programme has continued throughout 2022
and 2023 to date with new (or updated) strategies, policies, and plans approved at
committee in respect of the following: 
• North Lanarkshire Tourism Strategy - February 2022
• North Lanarkshire Social Enterprise Framework - February 2022
• Climate Plan: Action on Climate Together 2030 - February 2022
• Digital and IT Strategy - February 2022
• Tenant Sustainment Policy - August 2022
• Housing Domestic Abuse Policy - August 2022
• Corporate Asset Management Plan - September 2022
• Procurement Strategy - September 2022
• Economic Regeneration Delivery Plan (ERDP) 2023-28 - February 2023 
Annual review and refresh 
2.2 Although lite touch in comparison to the 2022 review, the 2023 review has included: 
• An update to the Review Programme with indicative timescales of when updates
are expected to ensure all strategies, policies, and plans continue to be kept under
review, are updated as required, and are reported to the relevant committee. 
• Identifying any gaps in terms of strategy or policy development in line with the five
priorities set out in The Plan for North Lanarkshire.
• A review of the supporting guidance to ensure strategies, policies, and plans are
developed in a standardised manner, consistently use a common format, and roles
and responsibilities are clear. 
• The further integration of impacts (similar to those on the committee report
template) and consideration of trauma informed practices within the guidance for
developing strategies, policies, and plans. 
2.3 The refreshed Strategic Policy Framework document is attached at Appendix 1.  This
sets out the hierarchy of strategies, policies, and plans which underpin delivery of the
long-term vision set out in The Plan for North Lanarkshire. 
2.4 The Strategic Policy Framework in Appendix 1 comprises two further appendices: 
• Appendix A: This contains the guidance which sets out the process to be followed
to ensure strategies, policies, and plans are formulated, developed, implemented,
monitored, and reviewed in a consistent and transparent manner.
• Appendix B: This sets out the Review Programme for each high-level strategy,
policy, or plan within the Strategic Policy Framework.  This includes an indicative
timetable outlining when a strategy, policy, or plan will be reported to the respective
committee following completion of the development or review process.   
Supporting governance 
2.5 Governance of the Strategic Policy Framework will continue to be undertaken through
the key strategic oversight roles set out below. 
(1) In line with the Standards Commission for Scotland (Advice Note for Councillors
on distinguishing between their strategic role and any operational work, December
2021) - Elected Members will continue to “determine policy and to participate in
decisions on matters placed before them” and “provide strategic leadership; to

Page 4

ensure financial stewardship is achieved through the efficient, economic and
effective use of resources; and hold the Chief Executive and senior management
team to account by scrutinising the implementation of policies, procedure and
expenditure”.
(2) In line with their remit and terms of reference to consider matters which are cross-
council in nature, the Corporate Management Team will continue to ensure
strategic oversight of the corporate strategies, policies, and plans developed by
the council and input into the development of such prior to submission to the
relevant committee for formal approval. 
(3) In line with their responsibility to provide an independent review of the council's
governance, risk management, performance, and control frameworks and to
review performance to assess whether intended policy outcomes have been
achieved, the Audit and Scrutiny Panel’s challenge and scrutiny role will aim to
ensure the Strategic Policy Framework and its accompanying Review Programme
operate effectively. 
Next steps 
2.6 The list of strategies, policies, and plans in Appendix B will be kept under review to
ensure updates are submitted to the relevant committee in line with the Review
Programme as well as the requirements of the Strategic Policy Framework and its
supporting guidance.  Further work will be undertaken, where required, to ensure
ongoing alignment with the updated Programme of Work for 2023 onwards. 
3. Measures of success 
3.1 Measures of success will be evidenced through progress being made to deliver upon
the ambition statements in The Plan for North Lanarkshire.   
Evidence that progress is having a positive impact on inclusive growth and prosperity
for local people and communities will realise the shared ambition where North
Lanarkshire is the place to Live, Learn, Work, Invest, and Visit. 
4. Supporting documentation 
4.1 Appendix 1 -  Strategic Policy Framework 
- Appendix A: Guidance 
- Appendix B: Review programme 
Katrina Hassell
Chief Officer (Business and Digital) 
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒

Page 5

If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?   
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact

Page 6

Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Work to review and refresh the Strategic Policy Framework and its accompanying
Review Programme contributes to the mitigation of the risks on the Corporate Risk
Register for managing strategic change and governance, leadership, and decision
making.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.

Page 7

Strategic Policy Framework  
Appendix 1

Page 8

2 
Document control
Title Strategic Policy Framework
Owner Katrina Hassell, Chief Officer (Business and Digital) Contact HassellK@northlan.gov.uk 
Governance group Policy and Strategy Committee
Author Susan Lawrie, Strategy and Performance Manager Contact LawrieS@northlan.gov.uk 
Revision history
Number Originator Date review commenced Revision description / record of change
1.0 Linda Johnston September 2018 Original framework created
2.0 Linda Johnston September 2019 Annual review
3.0 Linda Johnston September 2021 Annual review and refresh and alignment to the other strategic
frameworks
4.0 Linda Johnston September 2022 Annual review and refresh and alignment to the other strategic
frameworks 
Document approvals
Number Governance group Date approval granted Date approval to be requested
(if document still draft)
1.0 Policy and Resources Committee September 2018 
2.0 Policy and Strategy Committee September 2019 
3.0 Policy and Strategy Committee March 2022 
4.0 Policy and Strategy Committee  March 2023 
Consultation record (for most recent update)
Status of document consulted upon Strategic Policy Framework
Stakeholders consulted / date Operational Management Team (17/11/21 to 10/01/22); Corporate Management Team (03/02/22); Corporate Management
Team (10/02/23) 
Strategic alignment 
Next review commencement date
Review date September 2023 
The Plan for North Lanarkshire (all 5 priorities and 25 ambition statements), Programme of Work, Strategic Policy Framework, Strategic Governance Framework,
Strategic Performance Framework, Strategic Self-Evaluation Framework, Project Management Framework, Framework for Demonstrating Improved Outcomes for
Communities.

Page 9

3 
Table of contents 
Page
number
Introduction  …………………………………………………………………………………………….. 4 - 5
Strategy, policy, and legislative context in local government …………………………..……... 6 - 7
- National strategies, policies, and frameworks …………………………………………………... 6
- Local government policy framework …….…………………………………………………......… 6-7
Strategies, Policies, and Plans in North Lanarkshire Council …………………………...…….. 8 - 13
- Strategic planning framework …………………………………………………………...….…….. 8
- Definitions  …...………………………………………………………………………………..……. 8
- Framework hierarchy  ………………………………………………………………….…………... 8-10
- Overarching approach  ………………………………….…………………………………….…… 11
- Roles and responsibilities  ………………………………………………………………………… 11-12
- Non-negotiable standards  ………………………………………………………..………………. 12-13
- Development and review cycle  …...…………………………..………………………….………. 13
- Review programme ………………………………………………………..………………….……. 13
- Governance ………………………………………………………..………………….……. 13-14
Appendix A: Guidance  …………………………………………………………………..….…………. 15 - 24
Appendix B: Review programme ………………………………………………................................ 25 - 36

Page 10

4 
Introduction 
The Plan for North Lanarkshire sets the long-term strategic direction for
the council, partners, and other stakeholders and, most importantly, for
each unique local community and the people who Live, Learn, Work,
Invest, and Visit within North Lanarkshire.  It’s a Plan with a shared
ambition of inclusive growth and prosperity for all and a fairer distribution
of wealth across all local communities. 
The long-term ambition of The Plan for North Lanarkshire coupled with the
fast moving, unpredictable, and increasingly challenging and complex
local government environment, means planning and change are constantly
evolving and ongoing visibility into all programmes of work and their
interconnections - as well as the high level strategies, policies, and plans
supporting The Plan - is essential.   
The Programme of Work process provides a clear roadmap for work
across council services and with partners, and sitting alongside this - as a
key aspect of the council’s strategic planning framework - is the Strategic
Policy Framework.  This ensures that strategy and policy remain
connected to delivery in order to collectively facilitate a co-ordinated
approach to identifying the resources and working practices needed to
support delivery of the long-term vision. 
The Strategic Policy Framework - set out within this document - is one of
the inter-related corporate frameworks that are key to assessing the
success of The Plan for North Lanarkshire and monitoring delivery of the
Programme of Work (while ensuring each stage of delivery towards
achieving the overall ambitions is appropriately planned, guided,
implemented, and governed): 
• Strategic Policy Framework
• Strategic Governance Framework
• Strategic Performance Framework
• Strategic Self-Evaluation Framework
• Project Management Framework 
To ensure these frameworks remain aligned to The Plan for North
Lanarkshire, all are on a regular review and refresh programme.  This also
ensures the council is proactive in responding to social, economic, and
environmental trends and changes in legislation and governance, as well
as the broad range of national policy changes and new developments.
Strategies and policies created by national and local government affect
everyone in the community in some way - determining what services will
be provided and the level of those services, what kinds of development will
occur in a community, and what a community’s future will be. 
A central role of local government, strategy and policy development also
supports good governance and promotes operational efficiency by: 
• Enabling compliance with relevant legislation, other standards, and
community expectations.
• Providing a shared strategic vision and clear direction for all.
• Providing clear guidelines to make it easy for employees, and the
public, to understand the service delivery, management, and
governance approaches of a local authority and ensure consistency in
implementation.
• Supporting quality assurance and continuous improvement, and the
management of risk. 
The council’s approach to strategy and policy development is set out on
pages 8 to 14 of this Strategic Policy Framework document. This specifies
the hierarchy of strategies, policies, and plans which underpin delivery of
the long-term vision set out in The Plan for North Lanarkshire.   
Through a structured approach, the Strategic Policy Framework aims to
ensure that strategies, policies, and plans are formulated, developed,
implemented, monitored, and reviewed in a consistent and transparent
manner across the council.  The seven steps in the development and
review cycle, depicted on page 15, outline the process in this respect.   
Elected Members and officers are at the heart of local government policy
and delivery - with Members determining policy at the start of the process,
officers managing and implementing policy in the middle, and Members
scrutinising delivery at the end.  Key roles and responsibilities in this
respect are summarised on page 11. 
The Strategic Policy Framework sets out the high-level strategies, policies,
and plans which are subject to a formal review process to ensure they
remain fit for purpose and continue to align to the long-term vision of the
council.  A Review Programme is outlined in Appendix B (pages 25 to 36)
to support this.

Page 11

5 
Use of terminology
Policy, strategy, and plan are words that cover a wide spectrum of dimensions and  hierarchies. They range from: 
• Values and visions, policy direction, strategy documents, and strategic planning approaches, to detailed operational planning.
• Comprehensive wide scale planning to specific programme planning.
• A long-term 10-20 year time horizon, to a 5 year plan, a 3 year rolling plan, or an annual operational plan.
• National to regional to local plans. 
As such, the terminology used nationally and locally can vary considerably and the terms strategy, policy, and plan have often become interchangeable. 
This Strategic Policy Framework document does not attempt to examine or assess the correct use of the terms strategy, policy, or plan.  While it sets out a
succinct definition and naming convention for each term to ensure a common language and clear understanding across the council, its key purpose is to
provide a structured corporate approach to ensure the high-level strategies, policies, and plans that support delivery of The Plan for North Lanarkshire are
formulated, developed, implemented, monitored, and reviewed in a consistent and transparent manner.

Page 12

6 
Strategy, policy, and legislative context in local government 
National strategies, policies, and frameworks
Local government in Scotland operates within a legal framework that expresses national policy within Scotland and the priorities of the UK government. 
These policies cover every area of life from birth to death and all aspects of environmental, social, and economic regulation. 
Although policy and legislation are interrelated, each has a distinct function - a policy may have an associated piece of legislation that helps to enforce part,
or all, of it.  Or a policy may not be the result of legislation at all. 
The Scottish Government formulates and implements policy on devolved matters and introduces most bills (draft statutes) to be considered by the Scottish
Parliament.  The Scottish Parliament is the law making body for devolved matters and is responsible for scrutinising the work and policies of the Scottish
Government. The Scottish Government regularly consults on proposed areas of policy, such as a draft strategy or at the early stages of planning a Bill before
it is drafted. Interested parties or individuals may respond to a consultation. All consultation responses are analysed and used in the decision-making
process. The Scottish Government maintain a dedicated website (https://consult.gov.scot/) where anyone can participate in current consultations. 
Local government policy framework
In local government, policies can take the form of: 
• The process by which the UK or Scottish Government translate their political vision into programmes and actions to deliver outcomes and desired
changes in the real world.  These policies are cascaded to local government (and/or other public sector bodies) for implementation in line with legislation
(i.e. they are statutory), or for guidance purposes (i.e. they are not statutory).  
• A course or general plan of action on a particular subject to be adopted by the local authority.
• A statement of the local authority’s position, intent, or action. 
The policies created by national and local government affect everyone in the community in some way, determining: 
• What services will be provided to the residents, the level of those services, and the manner in which those services will be provided.  Some services are
mandated by law, others while not mandated are prudent to provide, while others are discretionary.
• What kinds of development will occur in a community.
• What a community’s future will be. 
Legislation Policy
• Sets out the law - the procedure or standard that people and
organisations must follow.
• Can be used to enforce the course of actions within a policy. 
• New laws may be developed to enforce part or all of a policy.
• Tend to be fixed for much longer periods of time.
• Must comply with existing law where it is required to do so, but may also lead to
the proposal of new laws.
• May be adopted to fulfil legislative commitments.
• Tends to evolve and adapt over time as a result of review processes. 
• Sets out what local government plans to do towards achieving a long-term
purpose or goal.

Page 13

7 
Policy decisions could be the adoption of a vision for a community, a comprehensive plan, a budget, or a policy relating to a specific issue such as allowing
or prohibiting a specific activity. 
The policy making process is not always easy and there are tough and courageous decisions to be made, sometimes on competing priorities.  Often there is
no right or wrong answer, which means it should come down to an objective search for the right solution at that time.  It could be that policies which, for
example, are set to benefit one area of service may have an adverse impact on another area of service.  In cases like this tough decisions are required to
identify how best to direct resources to ensure that the actions taken represent a whole system approach and the best possible solution for local people and
communities.

Page 14

8 
Strategies, Policies, and Plans in North Lanarkshire Council 
Strategic planning framework
The Plan for North Lanarkshire is well established as the long-term strategy for the council, partners, and other stakeholders and, most importantly, for each
unique local community and the people who Live, Learn, Work, Invest, and Visit within North Lanarkshire.  It sets out the shared ambition of inclusive growth
and prosperity for all and establishes the vision for a fairer distribution of wealth across all local communities.  It provides a very clear focus and compelling
narrative in terms of what the council is working towards in the long-term.   
As a key resource for delivering and sustaining the ambition, the Programme of Work provides a clear roadmap for work across council services and with
partners.  It allows for plans of action to be developed that inform the projects, activities, services, technologies, and resources that need to be harnessed in
order to seize the most and best opportunities to deliver on the long-term strategy, while achieving value for money in the here and now.  The Programme of
Work process is also instrumental in bringing together the elements that support local development, enterprise activities, and community investment in a
cohesive manner.   
Initially approved in September 2018, the Strategic Policy Framework sits alongside the Programme of Work in the
council’s strategic planning framework to ensure that strategy and policy remain connected to delivery in support of the
long-term vision.  This ensures that the high-level inter-related strategies, policies, and plans remain aligned to The Plan
for North Lanarkshire and collectively enable the resources and working practices needed in order to maximise impact
and facilitate delivery of the shared ambition.  Figure 1. shows how collectively the Strategic Policy Framework and
Programme of Work support The Plan for North Lanarkshire and the shared ambition of inclusive growth and prosperity
for all established therein. 
Definitions
There are many definitions of strategies, policies, and plans in existence in both the public and private sector, but the
Strategic Policy Framework adopts the following naming convention to ensure consistency across the council.  It is
recognised though that some national or statutory strategies, policies, and plans may follow a different convention. 
• Strategies - set out high-level medium to long-term aims that provide direction for the policies and plans required to
deliver on the programmes, projects, and activities in support of The Plan for North Lanarkshire.
• Policies - form the basis for day to day decisions in a regulated manner in order to support a consistent approach to implementation and delivery of the
services and the long-term vision.
• Plans - contain a detailed plan of action for delivery in the short to medium term in order to achieve specific aims within a specified timeframe. 
The local government policy framework section on page 6 specifies the three forms which policies can take in local government. 
Framework hierarchy
The hierarchy within the Strategic Policy Framework (depicted in Figure 2. on page 10) sets out the documents that define the council’s high-level activities in
line with The Plan for North Lanarkshire; this is categorised into three levels as detailed below.  
Figure 1:
Strategic Planning Framework

Page 15

9 
1. The corporate strategy that defines the overall strategic direction for the area over the long-term. 
2. Organisational level strategies or plans with strategic implications, corporate level risk, or corporate level statutory or regulatory requirements which
refer to:
(a) council strategies or plans, or 
(b)  partnership strategies or plans. 
3. Operational strategies, policies, or plans which refer to:
(c) practices across service specific activities (e.g. the environment or diet and nutrition).
(d) matters in respect of specific cross council activity which are relevant to all managers and employees (e.g. supporting attendance). 
Applying a hierarchical approach aims to provide a clear structure for the development of high-level strategies, policies, and plans that identifies lines of
authority and reporting.  This also aims to differentiate between strategies or polices that facilitate delivery of the vision set out in The Plan for North Lanarkshire,
are designed to ensure compliance with legal requirements, or are required to standardise internal processes.  It also helps to produce clear, well-developed
documents that are easy to follow, and easy to manage and update as required. 
The Strategic Policy Framework itself is guided and regulated by the overall statutory, regulatory, and governance requirements within which the council
operates (as set out in the Strategic Governance Framework).

Page 16

10 
Figure 2:
Strategic
Policy
Framework
hierarchy

Page 17

11 
Overarching approach
Where it has been appropriate to do so, several strategies, policies, and plans in the Strategic Policy Framework have been combined or specifically aligned. 
This aims to integrate related activities and review timescales and ensure that inter-related strategies, policies, and plans are aware of, and take account of,
common factors in order to align resources and maximise impact.  The strategies, policies, and plans that have been combined or aligned to date are listed in
the table below - this approach will continue to be part of the Strategic Policy Framework where it is relevant to do so. 
Overarching approach Strategies, policies, and plans aligned within the overarching approach
Financial Strategy
• Medium-Term Financial Plan
• Revenue Resources Budget Strategy
• Treasury Management Strategy
• Capital Strategy
• Financial Regulations and Scheme of Financial
Delegation
Digital and IT Strategy
• Acceptable Use of ICT Policy
• Information Governance Policy Framework
• Data Protection Policy
• Information Security Policy
• Records and Information Management Policy
• Records Management Plan
Environment Pathway 
• Air Quality Strategy
• Biodiversity Action Plan
• Contaminated Land Strategy
• Core Paths Plan
• Food Growing Strategy
• Woodland Management Plan
• Single Use Plastic Action Plan 
• While referenced within the Environment Pathway document to ensure appropriate alignment and integration, the
following are standalone strategies, policies, or plans due to the critical role each has in enabling delivery of the
place-based aspects of The Plan for North Lanarkshire and the extent of corporate requirements and
responsibilities set out therein - Local Development Plan, Climate Plan (Action on Climate Together 2030), Active
Travel Strategy 2021-31, and the Local Transport Strategy. 
Roles and responsibilities
Elected Members and officers are at the heart of local government policy and delivery and how they work together is fundamental to success.  Good
governance underpins these working relationships, which in turn provide a firm foundation for Best Value. 
The role of Elected Members “is to determine policy and to participate in decisions on matters placed before them. It is not to engage in direct operational
management of the council’s services”.   
It is to “provide strategic leadership; to ensure financial stewardship is achieved through the efficient, economic and effective use of resources; and hold the
Chief Executive and senior management team to account by scrutinising the implementation of policies, procedure and expenditure”. 
(Standards Commission for Scotland, Advice Note for Councillors 
on distinguishing between their strategic role and any operational work, December 2021) 
The Local Government (Scotland) Act 1973 requires the council to maintain a list specifying those powers which are exercisable by officers, and stating the
title of the officer who exercises that power.  To fulfil this requirement, the council has a Scheme of Delegation to Officers to accompany the Scheme of
Administration:

Page 18

12 
• The Scheme of Delegation to Officers sets out the powers delegated by the Council to officers, pursuant to the Local Government (Scotland) Act
1973.  The Scheme is intended to facilitate the efficient conduct of council business by clearly setting out the nature and extent of the powers delegated
to officers by the Council.  All decisions require to be made in line with council policy, procedure, guidance and (where appropriate) within approved
budget.  This is available on Mars: https://mars.northlanarkshire.gov.uk/egenda/images/att90599.pdf   
• The Scheme of Administration provides the details and different functions of committees and other groups of the council, and the delegation of
authority to carry out the functions of the council.  This is available on Mars: https://mars.northlanarkshire.gov.uk/egenda/images/att98939.pdf 
Non-negotiable standards
To support the development of new strategies, policies, and plans within the Strategic Policy Framework - or updates to existing documents - a set of five
non-negotiable standards are in place within the council.   
The five non-negotiable standards are designed to ensure consistency across the inter-related corporate frameworks (Policy, Governance, Performance,
Self-Evaluation, and Project Management), but more importantly ensure that strategy and policy development supports delivery of the council’s long-term
vision, ensures compliance with relevant legislation, and supports effective use of resources in line with Best Value requirements. 
The set of five non-negotiable standards are designed to ensure that development of strategies, policies and plans carried out
in line with the Strategic Policy Framework and its accompanying Review Programme are: 
• Aligned - to The Plan for North Lanarkshire so that aims, objectives, and action plans support the achievement of the
council’s long-term vision by reflecting contributions to the priorities and ambition statements.   
• Consistent - in their formulation, development, and implementation so there is a structured approach to making best
use of public resources through clear strategies, policies, and plans that ensure resources are deployed to achieve the
council’s strategic priorities, meet the needs of local communities, and deliver continuous improvement.  Consistency in
the process will also ensure there is a clear understanding of the purpose and role of each strategy, policy, or plan in
terms of the service delivery, management, and governance approaches of the council. 
• Transparent - in terms of ensuring appropriate consultation and communication in the development and
implementation of strategies, policies, and plans.  The development process should be appropriately informed by
evidence.  It should be clear that the council has engaged with and involved all relevant stakeholders as well as
equality groups to improve and inform the relevant policies and practices, and that socio-economic disadvantage has
been taken into consideration when making strategic decisions. 
• In context - ensuring that the development process takes cognisance of, and is responsive to, relevant legislation
and other standards to ensure full compliance in this respect.  Identifying the case for a new strategy or policy should also involve ensuring cross
council collaboration and a one council approach so there is no replication of other practices already in place to achieve the desired results.  This
collaboration should also avoid strategies or policies pulling in different directions by ensuring a positive impact of a policy on one aspect of North
Lanarkshire’s population, for example, does not have a negative effect on another.  Changes in the fast moving, uncertain, and complex local
government environment within which the council operates also require due consideration in the development and review process.  As such, this
should therefore involve consideration of the impact of the coronavirus pandemic and the resultant social and economic effects on the people and
communities of North Lanarkshire and any need to realign any strategy, policy, or plan in light of this.
Figure 3: 
Five non-negotiable standards

Page 19

13 
• Balanced - in terms of ensuring each item within the Strategic Policy Framework is on a regular programme of review so that it remains up to date
and is reported to the relevant committee.  While regular monitoring and review processes are important to ensure strategies, policies, and plans
remain fit for purpose and continue to align to the long-term vision of the council, this needs to be proportionate to the resources expended,
outcomes expected, and the associated risks. 
Development and review cycle
A set of guidance is in place - see Appendix A - which outlines the steps in the process to ensure strategies, policies, and plans are formulated, developed,
implemented, monitored, and reviewed in a consistent and transparent manner across the council. 
This also outlines specific roles and responsibilities in the development and review cycle and provides links to templates to be used to produce the strategy,
policy, or plan document in line with Strategic Policy Framework requirements and the council’s brand guidelines. 
Review programme
Appendix B outlines the Review Programme for each strategy, policy, or plan within the Strategic Policy Framework.  This includes an indicative timetable
outlining when an updated strategy, policy, or plan will be reported to the respective committee following completion of the review and update process.  It
should be noted that this Review Programme only refers to substantial updates to the respective strategy, policy, or plan document which are required to re-
iterate the intent halfway through the lifespan of the document for example, or because the document has reached the end of its life.  It does not capture
supporting action plans which are reviewed and updated annually through other means. 
The timescale between the date the review is scheduled to take place and approval at committee may vary depending on the extent of the review and
engagement process that requires to be undertaken for a specific strategy, policy, or plan.  As a rule of thumb all updated strategies, policies, and plans
require to be presented to the relevant committee within three months of the conclusion of the review process. 
All reports scheduled to be presented to committee with a new, or updated, strategy, policy, or plan document that is listed in Appendix B should be
considered by the Corporate Management Team in advance. 
Governance 
Strategic oversight
Governance of the Strategic Policy Framework will continue to be undertaken through the key strategic oversight roles set out below. 
(1) In line with the Standards Commission for Scotland (Advice Note for Councillors on distinguishing between their strategic role and any operational
work, December 2021) - Elected Members will continue to “determine policy and to participate in decisions on matters placed before them” and
“provide strategic leadership; to ensure financial stewardship is achieved through the efficient, economic and effective use of resources; and hold the
Chief Executive and senior management team to account by scrutinising the implementation of policies, procedure and expenditure”.
(2) In line with their remit and terms of reference to consider matters which are cross-council in nature, the Corporate Management Team will continue to
ensure strategic oversight of the corporate strategies, policies, and plans developed by the council and input into the development of such prior to
submission to the relevant committee for formal approval. 
(3) In line with their responsibility to provide an independent review of the council's governance, risk management, performance, and control frameworks

Page 20

14 
and to review performance to assess whether intended policy outcomes have been achieved, the Audit and Scrutiny Panel’s challenge and scrutiny
role will aim to ensure the Strategic Policy Framework and its accompanying Review Programme operate effectively. 
Alignment with the Strategic Governance Framework
The council’s Strategic Governance Framework brings the principles of good governance together with legislative requirements and management processes
by which the council is directed and controlled and through which it is accountable to, engages with, and leads the local community. 
In practice, governance comprises the combination of structures, strategies, policies, plans, frameworks, systems, processes, rules, codes, procedures,
cultures, and values that are used to direct, control, and manage a local authority’s operations and activities.  This includes political, economic, social,
environmental, legal, and administrative structures and processes, and other arrangements, as encapsulated in the principles defined in the Strategic
Governance Framework.  The list of items referred to in this paragraph are hereinafter referred to as elements and mechanisms.   
These elements and mechanisms define roles and responsibilities and accountabilities and establish mechanisms to enable the council to effectively pursue
the long-term ambition set out in The Plan for North Lanarkshire, while ensuring this is underpinned with control and the management of risk, and: 
• Resources are directed in accordance with agreed policies and according to priorities, and in line with corporate project management procedures.
• There is sound and inclusive decision making.
• There is clear accountability for the use of those resources in achieving defined outcomes for service users and local communities. 
As the council’s local code of governance, the Strategic Governance Framework is key in supporting the national good governance principles set out in the
Good Governance in Local Government: Framework (CIPFA, 2016). 
As the Strategic Policy Framework (and its accompanying Review Programme) provide a way to ensure that strategies, policies, and plans are formulated,
developed, implemented, monitored, and reviewed in a consistent and transparent manner across the council, it sits alongside the Strategic Governance
Framework Review Programme in outlining the council’s policy context in this respect.   
The Strategic Policy Framework guidance (in Appendix A) also supports more specific compliance with the principles of good governance, for example in
ensuring the council has effective counter fraud and anti-corruption arrangements are in place.  As such the guidance sets out the requirement for the
development of strategies, policies, and plans to consider any alignment required with the Corporate Anti-Fraud Policy and the need for any subsequent
actions to be implemented as a result of such considerations.

Page 21

15 
Appendix A: Guidance 
Development and review cycle 
The development and review cycle refers to the different phases in the strategy or policy making process.  This outlines the steps required to ensure
strategies, policies, and plans are formulated, developed, implemented, monitored, and reviewed consistently and transparently. 
There are seven steps in the cycle within the Strategic Policy Framework; these are set out in Figure 4. below.   
These steps should be applied to all strategy and policy development and review work undertaken in the council in line with the Strategic Policy Framework.   
While these steps provide a consistent and standardised approach to strategy and policy development in line with the Strategic Policy Framework and
Review Programme, specific strategies or policies may have their own legislative requirements, or there may be a need to customise particular steps in order
to best meet the needs, operating environment, and desired outcomes of the strategy or policy being developed or reviewed.   
Each of the steps outlined in the process are set out in more detail on pages 16 to 24. 
Figure 4: 
Development and review cycle

Page 22

16 
Development and review cycle 
1. Identify and scope
(i) Clarify roles and responsibilities
Owner
• In all cases, an owner for a strategy, policy, or plan should be identified - this should be a Chief Officer who is responsible for:
- Ensuring that the strategy, policy, or plan is developed in line with the long-term vision set out in The Plan for North Lanarkshire as well as relevant legislation.
- Identifying the case for a new strategy or policy, ensuring this new development does not replicate other available means of achieving the desired results, and ensuring
compliance with the five non-negotiable standards (see pages 12 and 13).
- Assigning an author / content manager and ensuring adherence to the Strategic Policy Framework guidance.
- Ensuring reviews are carried out in line with the timescales set out in the Strategic Policy Framework Review Programme. 
- Making sure consultation takes place with all relevant stakeholders.
- Ensuring that strategic oversight is carried out by the Corporate Management Team.
- Seeking approval of new strategies, policies, or plans by Elected Members through the relevant council committee.  Note - committee approval is also required for
significant changes to existing strategies, policies, and plans.
• The policy owner must ensure performance of a strategy, policy, or plan is monitored and evaluated to assess achievement and effectiveness of the desired outcomes.
• The policy owner must also be aware that Elected Members and officers are at the heart of local government policy and delivery - with Members determining policy at
the start of the process, officers managing and implementing policy in the middle, and Members scrutinising delivery at the end.  The owner of a strategy, policy, or plan
should therefore ensure ongoing engagement with Elected Members, as appropriate. 
Author / content manager
• In all cases an author / content manager should be identified - this should be an officer in a senior officer role who is responsible for:
- Managing / developing the strategy, policy, or policy document in line with the Strategic Policy Framework guidance.
- Liaising with service colleagues and subject matter experts across the council regarding evidence, stakeholder feedback, and content.
- Ensuring compliance with accessibility requirements for public sector bodies which came into effect in September 2018, the corporate branding guidelines (which are
available on InsideNL, and the Strategic Policy Framework design process (see step 2 (iii)).  This includes uploading published documents to the council’s website      
( https://www.northlanarkshire.gov.uk/your-council/council-strategies-and-plans ) and ensuring this is kept up to date.
- Carrying out the relevant impact assessments (see step 1 (iii) below) as part of the development and review process. 
(ii) Identify the issue and formulate the response
As noted on page 6 of the Strategic Policy Framework, policies in local government can take the form of: 
• The process by which the UK or Scottish Government translate their political vision into programmes and actions to deliver outcomes and desired changes in the real
world.  These policies are cascaded to local government (and/or other public sector bodies) for implementation in line with legislation (i.e. they are statutory), or for
guidance purposes (i.e. they are not statutory).  
• A course or general plan of action on a particular subject to be adopted by the local authority.
• A statement of the local authority’s position, intent, or action. 
The role of the council in identifying the issue and formulating the response depends on which of the above has informed the development of the strategy, policy, or plan. 
Policies cascaded to local government will generally be for implementing or for guidance.  Policies developed by the council will require the formulation step to be put into
practice - as the first step in sound policy-making is properly identifying a problem and designing the right response(s) to address it.

Page 23

17 
(iii) Assess impacts
Impact assessments are a means of predicting the potential impact of a strategy, policy, or plan on different aspects of council business or on service users, local
communities, or individuals. The following impacts must be considered in the development and review process: 
(1) Public Sector Equality Duty and Fairer Scotland Duty
• The Public Sector Equality Duty requires the council to assess the impact of applying a proposed new or revised policy or practice against the needs of the
general equality duty and to publish the results of the assessment. As a general fail safe rule, if the policy or practice is about people then an equality impact
assessment should be carried out.  
• The Fairer Scotland Duty requires the council to consider what more it can do to reduce the inequalities of outcome, caused by socio-economic disadvantage, in
any strategic decision-making or policy development context, and publish a written assessment showing how it has done this.   
All covering reports for strategies, policies, and plans should state (a) whether there is a Public Sector Equality Duty and/or Fairer Scotland Duty impact, (b) if so
what that impact is, and (c) if an assessment has been completed and published. Please note once completed, a summary of this assessment requires to be
published on the council’s website ( https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-scotland-duty-impact-assessments ) and
included in the covering committee report, where it is relevant to do so.   
Note where a strategy, policy, or plan does have an impact in this respect it must also be reflected in the document itself.   
There is one form to complete the assessment for both a Public Sector Equality Duty and Fairer Scotland Duty impact and also supporting guidance; this information
is available on MyNL: https://mynl.co.uk/knowledge-base/equality-impact-assessments/   
For any queries in completing this section please e-mail: CameronAu@northlan.gov.uk. 
(2) Financial - Where there is a financial impact please ensure this is summarised or stated clearly if none are anticipated.  In doing so please ensure that all financial
impacts have been discussed and agreed with Finance.  For any queries please liaise with colleagues in Finance. 
(3) HR policy - Where there is a HR policy impact please ensure this is summarised or stated clearly if none are anticipated.  In doing so please ensure that all HR
policy or procedure impacts have been discussed and agreed with People Resources.  For any queries please liaise with colleagues in People Resources. 
(4) Legal - Where there is a legal impact please ensure this is summarised or stated clearly if none are anticipated.  In doing so please ensure that all legal impacts
have been discussed and agreed with Legal and Democratic, particularly with regard to any references to general legal matters, statutory considerations (including
employment law considerations), or new legislation and the impact this may have on the council.  For any queries please liaise with colleagues in Legal and
Democratic. 
(5) Data protection - If the strategy, policy, or plan contains or involves the processing of personal data and, if so, if the processing of this personal data is likely to
result in a high risk to the data subject then a Data Protection Impact Assessment (DPIA) requires to be carried out.  Further guidance, and the template to complete
a DPIA, is available on InsideNL. 
Once the DPIA is completed, it should be e-mailed to the regulation and governance team in legal at dataprotection@northlan.gov.uk.
For any queries or further advice regarding data protection impacts, please refer to the guidance on InsideNL or contact the regulation and governance team in legal
(e-mail: dataprotection@northlan.gov.uk ). 
(6) Technology / Digital - Digital First remains the basis for all service redesign and the Digital and IT Strategy highlights how new technology, service redesign, and
connectivity will be used to deliver the digital ambition in terms of Digital Communities, a Digital Economy, and a Digital Council.  Any service redesign aspects within
Strategic Policy Framework items must be considered within the context of Digital First and the Digital and IT Strategy.

Page 24

18 
Where there is an impact on either technology, digital transformation, service redesign / business change processes, data management, or connectivity / broadband /
WiFi, colleagues in Business and Digital should be consulted with to enable a one council approach in this respect and to ensure whole system governance.   
Where the impact identifies a significant requirement for technology, an assessment requires to have been carried out by the Enterprise Architecture Governance
Group (EAGG). 
For any queries regarding the technology / digital impact, please refer to the checklist within the report guidance on InsideNL. 
For any queries or advice, please e-mail: BusinessAndDigitalPMO@northlan.gov.uk 
(7) Environmental / Carbon - the impact in this respect must be considered for all strategies, policies, plans, strategic frameworks, or practices.  It should also be
considered where a strategic decision requires to be made (e.g. involving a major procurement or commissioning exercise, a charging policy, a budget decision, or a
workforce / resource plan), where a project concerns major service redesign or transformation activity, or where there is an impact on the measurement of the
council’s carbon footprint (i.e. it concerns waste, transportation, buildings, housing, or fuel poverty).  To do this an impact assessment must be carried out (as per the
template on InsideNL) and a summary of the impact must be included in the strategy, policy, or plan document, where relevant. 
For any queries regarding defining the environmental / carbon impact, please refer to the checklist within the report guidance on InsideNL.
For any further queries or advice please e-mail: CarbonGroup@northlan.gov.uk   
(8) Risk Management - Key risks surrounding a decision and how these are or will be managed or implemented should always be highlighted in the narrative of the
strategy, policy, or plan.  The audience should receive assurance that the author has carried out a proportionate risk assessment related to the issue and
recommendations in compliance with the council's decision-making risk management guidance.  In offering this assurance the author is confirming that: 
a. Risk assessment documentation relating to the decision has been completed and reviewed by relevant senior management.
b. All significant risks relating to the strategy, policy, or plan and how these will be managed are highlighted in the document.
c. Risks relating to the strategy, policy, or plan have, as appropriate, been included in Service or Project Risk Registers and will be managed and subject to
monitoring and review in accordance with the council’s Risk Management Strategy. 
Note, there is a template which should be used to assess risks within the context of the topic of the particular strategy, policy, or plan.  This will assist with the
formulation of risks to be highlighted in the strategy, policy, or plan and where they will be managed.  This template is available on InsideNL. 
For any queries, please refer to the contact details for the Risk Team and Service Risk Champion available on InsideNL. 
(9) Armed Forces Covenant - The Covenant Duty is a legal obligation on certain public bodies to have due regard to the principles of the Covenant and requires
decisions about the development and delivery of certain services to be made with conscious consideration of the needs of the Armed Forces community.   
The Armed Forces Covenant Duty is based upon two key principles:
• The Armed Forces community should not face disadvantage compared to other citizens in the provision of public and commercial services.
• Special consideration is appropriate in some cases, especially for those who have given most, such as the injured and the bereaved. 
The new legal obligation impacts organisations that are responsible for delivering principally statutory functions in healthcare, education, and housing services. The
Armed Forces community (particularly those who have given the most - which includes in-Service and ex-Service personnel, their families, and widow(er)s) will be
affected as beneficiaries of the Duty. 
When developing a strategy, policy, or plan due regard should be made to the Armed Forces Covenant Duty (i.e. does it relate to healthcare, housing, or education
services for in-Service or ex-Service personnel, or their families, or widow(er)s)? 
If so, then the provision which has been made should be recorded to ensure there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure they do not face disadvantage compared to other citizens in the provision of public services.

Page 25

19 
(10) United Nations Convention on the Rights of the Child (UNCRC) - Work is underway to provide guidance in terms of identifying and assessing the impact of the
Rights of the Child in the development of strategies, policies, or plans.  This is scheduled to be implemented by the summer of 2023. 
Trauma informed practice
Trauma informed approaches are in operation in the council (recognising that trauma can affect individuals, groups, and communities) in line with the national trauma
framework. Trauma results from an event, series of events, or set of circumstances that is experienced by an individual as harmful or life threatening. While unique to the
individual, generally the experience of trauma can cause lasting adverse effects, limiting the ability to function and achieve mental, physical, social, emotional, or spiritual
well-being. 
Trauma informed practice is an approach used at present by a range of organisations (including for health and care interventions) and it aims to increase awareness of
how trauma can negatively impact on individuals and communities, and their ability to feel safe or develop trusting relationships with services and staff.  It aims to improve
the accessibility and quality of services by creating culturally sensitive, safe services that people trust and want to use. It seeks to prepare practitioners to work in
collaboration and partnership with people and empower them to make choices about their health and wellbeing.  Trauma-informed practice acknowledges the need to see
beyond an individual’s presenting behaviours and to ask, What does this person need? rather than What is wrong with this person? 
There are 6 principles of trauma-informed practice: safety, trust, choice, collaboration, empowerment, and cultural consideration. 
An overview can be found in the following video ( https://vimeo.com/274703693 ), and further information is available on the following website, this includes help in
developing trauma-informed policies, systems, and practices: https://transformingpsychologicaltrauma.scot/ 
(iv) Procurement considerations
Procurement contracts can sometimes require the council’s strategies, policies, and plans to be reflected.  There is no set list for such purposes as each procurement will
require to consider which of the council’s strategies, policies, and plans are most applicable to that which is being procured.  The Strategic Policy Framework hierarchy
diagram on page 10 of this document provides a useful starting point (as does the council’s website: https://www.northlanarkshire.gov.uk/your-council/council-strategies-
and-plans ), but this will require to be considered within the context of the supplies, works, or services being procured. 
(v) Fraud and corruption risks
Where applicable, the development of strategies, policies, and plans should also consider any alignment required with the Corporate Anti-Fraud Policy and the need for
any subsequent actions to be implemented as a result of these considerations.  This aims to ensure that the council continues to adopt a response that is appropriate for
its fraud and corruption risks and is committed to maintaining its vigilance to tackle fraud.  Having up to date policies supports the council being able to demonstrate the
existence of effective anti-fraud arrangements.
2. Gather evidence and draft
(i) Gather evidence
The council requires strategies, policies, and plans that respond to the needs of local people and communities and contribute positively towards delivery of the shared
ambition for the area, as set out in The Plan for North Lanarkshire.  Meeting the Best Value duty of continuous improvement requires an approach to policy setting that is
informed by evidence that draws on research, evaluation, and data trends.   
Many types of evidence can inform policy development; this can take the form of evaluations that determine the effectiveness of interventions or policies, studies that
collect the views of people about the acceptability of a policy or intervention, people’s views on their needs or requirements, and descriptions of how or whether current
policies are being implemented. The views of stakeholders are essential in formulating and reviewing strategies, policies, and plans. 
The council website contains a general set of data regarding the people of North Lanarkshire: https://www.northlanarkshire.gov.uk/your-council/facts-and-figures - this
includes information on population, households, employment, and deprivation and is updated as new data becomes available.

Page 26

20 
The Strategic Performance Framework supporting The Plan for North Lanarkshire contains a set of high level context indicators about the place that is North Lanarkshire;
this is reported to the Policy and Strategy Committee annually each March.   
(ii) Identify outcomes
The Community Empowerment (Scotland) Act 2015 puts an outcomes approach to public services on a statutory footing.  Audit Scotland, in its briefing paper Planning for
Outcomes ( https://www.audit-scotland.gov.uk/report/planning-for-outcomes ) states that intentions, measurement, and evidence supporting outcomes should be
considered early in planning processes.   
Within this briefing note, it is recommended that “new policies, strategies or plans should set out the outcomes they are aiming to achieve and the intermediate outputs,
measures and milestones. Aligning activities with outcomes involves considering what a proposed new strategy is aiming to achieve at the outset and being clear what
success will look like.” 
(iii) Draft the document
Design process
A suite of templates have been developed by Corporate Communications for authors / content managers to use in the development process; the level 3 templates are
available on InsideNL.  The use of these templates aligns to the levels in the Strategic Policy Framework hierarchy (as depicted in Figure 2. on page 10 under reference to
parts (a), (b), (c), and (d).   
• Organisational level strategies or plans (level 02) - for either (a) council or (b) partnership - the full version of these documents will be produced by Brand and
Creative in Corporate Communications in either portrait or landscape layout using the corporate brand (e.g. the Workforce for the Future Strategy or the Climate
Plan).  Note that some of the partnership plans may be produced externally to the council and will not follow this standard, but should have the corporate North
Lanarkshire branding and descriptor where possible.  Please ensure the time to design a document is built into the development process and the full approved copy
should be supplied as an unformatted word document.
• Operational strategies, policies, or plans (level 03) - which refer to (c) practices across service specific activities.  A general policy / plan template produced by
Brand and Creative (in either portrait or landscape layout) - with the relevant live, learn, work, invest, and visit brand descriptor (e.g. LIVE HERE) - requires to be
used when drafting operational strategies, policies, and plans. This template can be found on InsideNL and can be used by all staff as appropriate. Documents used
in this way do then not need to be designed by Corporate Communications. 
• Operational strategies, policies, or plans (level 03) - which refer to (d) matters in respect of service specific cross council activity.  The Basic template produced
by Brand and Creative (in either portrait or landscape layout) - with full brand stack: live, learn, work, invest, visit applied but relevant brand descriptor in bold -
requires to be used when drafting operational strategies, policies, and plans. This template can be found on InsideNL and can be used by all staff as appropriate.
Documents used in this way do then not need to be designed by Corporate Communications. 
Drafting
Strategies, policies, and plans require to be written in clear and concise language that is easily understood by all.  A One Way of Reporting booklet has been developed
by Corporate Communications - this style guide provides guidance for those who have to put something in writing on behalf of the council.  This can be anything from a
letter, leaflet, strategy document, or news release to a committee report.  This is available on InsideNL. 
Some tips include:
1. Minimise the use of jargon, technical language, and acronyms.  When this is unavoidable, these must be explained or stated in full and where essential a glossary of
terms should be included.
2. Avoid using text that may become out of date quickly.
3. Make best use of headings, bulleted lists, and tables to break up rows and rows of text.
4. Vary sentence lengths - include long and short sentences; long sentences should be no more than 15 - 20 words.
5. Remember that strategies, policies, and plans should be written in the third person, e.g. “the council” (not in the first person, e.g. “I” or “us” or “you”).

Page 27

21 
6. Don’t use double negatives - they can often be confusing to the reader.
7. Don’t repeat the same message in several different paragraphs unnecessarily.
8. Remember that only proper nouns get a capital letter.
9. Remember to do a proofread - include grammar and spell checks and make sure there is consistency in font, style, and formatting.
10. Don’t use the passive voice in writing, e.g. “it will be sold by the council”.  The active voice should be used, e.g. “the council will sell it”. 
(iv) Complete the mandatory sections 
The document control section of all strategy, policy, and plan documents developed or updated in line with the Strategic Policy Framework must be completed by the
author / content manager irrespective of whether the document is produced by Corporate Communications or not.  This is a central record of the basic information relating
to the strategy, policy, or plan and is important in the development process in terms of identifying what changes have been made and when, the extent of stakeholder
consultation, and the approvals and governance processes.   
The author / content manager must ensure this section is completed accurately, remembering to set a review date for the next update of the document. 
Guidelines for each of the mandatory sections is provided below:
Document control
Title title of the document
Owner chief officer name and title Contact owner e-mail address
Governance group name of council committee responsible for approving new strategic or policies in this respect (or significant changes), in line with the Scheme of
Administration and committee terms of reference therein
Author author name and title Contact author e-mail address 
Revision history
Number Originator Date review commenced Revision description / record of change
1.0 name of person who initiated
the change
date development work
commenced (month and year,
e.g. June 2021)
short description of the reason for the revised version and/or a record of the
change made
2.0   
3.0   
etc   
Document approvals
Number Governance group Date approval granted Date approval to be requested
(if document still draft)
1.0 name of council committee that approved the new or changed
strategy or policy 
date of committee meeting that
approval was granted (month and year,
e.g. September 2021)
when document is still in draft and has
not yet been approved insert date of
committee meeting that the final
version is expected to be presented to
for approval
2.0

Page 28

22 
3.0   
etc   
Consultation record (for most recent update)
Status of document consulted upon state title of document and if the document is still in a draft format or if it is a final version
Stakeholders consulted / date  name(s) of stakeholders consulted and date (month and year) and method (e.g. online survey, face to face, focus group, etc) 
Strategic alignment 
Next review commencement date 
This section should highlight the alignment of the strategy, policy or plan to The Plan for North Lanarkshire.  
Please state the relevant (a) priority and (b) ambition statement(s) that are most relevant to the document. 
Review date date when the next review will commence (not
the date it will be reported to committee)
3. Consult with relevant stakeholders
(i) Identify stakeholders
As well as providing evidence to assist in the policy formulation and development processes, stakeholders’ views must be sought before final committee approval with
sufficient time allowed for meaningful consideration.  New or refreshed strategies and policies are subject to a minimum consultation period of 21 working days. 
The report author / content manager should identify all interested parties and ensure appropriate engagement with, for example: 
- other council services    -  specific communities or community groups
- employees      -  all North Lanarkshire residents
- elected members     -  partner organisations
- trade unions      -  other public bodies
- specific service users     -  others, as required 
(ii) Tools and techniques
In terms of public consultation, the council’s website has a section dedicated for this purpose ( https://www.northlanarkshire.gov.uk/your-community/working-
communities/consultations ). This section should be used - along with other methods as appropriate - when draft strategies, policies, or plans require feedback from the
public as part of the development process. 
(iii) Consultation record
As part of the consultation process, the report author / content manager should ensure the mandatory document control section is completed in this respect.
4. Get strategic oversight and approval
(i) Obtain committee approval
The role of Elected Members is set out on page 11 of this document (as per the Standards Commission for Scotland Advice Note).  This makes it clear that the role of
Members is to “determine policy”.  All new (or significant changes to existing) strategies, policies, and plans within the Strategic Policy Framework must therefore be

Page 29

23 
approved at the relevant committee. 
The business to be transacted at committees, the arrangements for committee meetings, and the functions delegated to committees is regulated in accordance with the
Scheme of Administration.  The Scheme of Administration therefore sets out the terms of reference for committees and, as such, should be consulted to ensure the new
(or updated) strategy, policy, or plan is submitted to the relevant committee for approval.  The Scheme of Administration is published on the council’s website: 
https://www.northlanarkshire.gov.uk/your-council/how-the-council-works/standing-orders-and-scheme-of-administration 
(ii) Ensure strategic oversight
The Standards Commission for Scotland Advice Note (see page 11) also sets out the responsibility of the Chief Executive and senior employees to help ensure that the
policies of the council are implemented. 
Strategy, policy, plan owners (i.e. Chief Officers) are therefore responsible for ensuring a final review of the strategies, policies, and plans within the Strategic Policy
Framework prior to strategic oversight by the Corporate Management Team (CMT) and committee approval thereafter. 
Chief Officers are also responsible for ensuring appropriate CMT oversight in line with the CMTs terms of reference to ensure strategic oversight of the corporate
strategies, policies, and plans developed by the council and input into the development of such prior to submission to Committee for formal approval. 
(iii) C paragraphs
A paragraph within a committee Minute designated with the letter 'C' denotes that the item is subject to consideration by the Council meeting. All other items have been
delegated in terms of the approved Scheme of Administration and will therefore be submitted for information only.  This often relates to a decision regarding approval of a
new strategy or policy (or a significant change to either) that has previously been approved by a specific committee; in these instances paragraph 22 of the council’s
Standing Orders for meetings apply and approval is therefore also required at the Council meeting.  The process for defining ‘C’ paragraphs is undertaken by Committee
Services staff.
5. Communicate and implement
(i) Communication
It is essential that all stakeholders are aware of the existence of council strategies, policies, and plans that are relevant to them.
For these to be effective, owners must ensure appropriate communication takes place at each relevant stage in the process.  Such communication should: 
• Take place at the stakeholder engagement process in the development of the strategy, policy, or plan.
• Use the council’s consultation web page, should public feedback be required ( https://www.northlanarkshire.gov.uk/your-community/working-
communities/consultations )
• Involve staff who currently apply the policy and may need to make alterations to day to day operations in order to implement a new or changed policy.
• Consider if there is a role for the Community Boards in any public consultation exercise to ensure local community groups can be fully engaged with, if so please
involve the Community Partnership team.
• Ensure engagement with service users who are affected by the change(s).
• Ensure that, where necessary, education or training is provided to put the requirements of the strategy, policy, or plan into effect.
• Involve the distribution of the strategy, policy, or plan following the formal approval process. 
When identifying all aspects of communication required for the strategy, policy, or plan following formal approval at committee, the following should also be considered: 
• If the strategy, policy, or plan is controversial.
• If the strategy, policy, or plan requires public promotion of something.
• If the strategy, policy, or plan means a change in the way the service is delivered that will impact on service users or residents, or that requires people accessing the

Page 30

24 
service to behave in a different way.
• If the strategy, policy, or plan means a reduction or cessation of service.
• If the strategy, policy, or plan means any change for employees in other services. 
If any of these apply, please liaise with colleagues in Corporate Communications so that they are aware of any potential reputational risks and can design appropriate,
timely communications activity. 
(ii)  Implementation
Getting policy implementation right is critically important. Failure to do so can have a financial impact and cause disruption for local residents and service users.  The
owner should ensure that there is a plan for implementation and communication that is developed in advance.
6. Monitor and review
(i) Monitor
Strategies and policies should be regularly evaluated to determine how well they are working - are they achieving their desired aim? 
Obtaining public or service user feedback, establishing a suite of performance measures, carrying out a self-evaluation exercise, or undertaking a cost-benefit analysis are
some examples of ways to evaluate the effectiveness of a strategy, policy, or plan.  For further information regarding performance measures or self-evaluation please e-
mail StrategyAndPerformance@northlan.gov.uk 
(ii) Review
It is essential that each item within the Strategic Policy Framework is kept on a Review Programme so that it remains up to date and is reported to the relevant committee. 
While regular monitoring and review processes are important to ensure strategies, policies, and plans remain fit for purpose and continue to align to the long-term vision of
the council, this needs to be proportionate to the resources expended, outcomes expected, and the associated risks. 
Some review and update timescales are set by statute, or by national or partner organisations, but in principle all strategies, policies, and plans within the Strategic Policy
Framework should be reviewed and updated within a minimum of five years. 
As part of the review process for existing documents, the respective strategy, policy, or plan document should follow the same stakeholder engagement and strategic
oversight process as new documents.   
(iii) Approvals
Significant amendments to an existing strategy, policy, or plan document must be approved at the relevant committee.  
• A significant amendment is a change to the purpose or scope, or to the content, or to the responsibilities for implementing a strategy, policy, or plan.  
• Minor amendments are changes that do not affect the general meaning, scope, purpose, or intent of the strategy, policy, or plan.
7. Publish
Once formal approval has been provided by the relevant committee, all corporate level strategies or plans should be published on the council’s website:
https://www.northlanarkshire.gov.uk/your-council/council-strategies-and-plans.   
The author / content manager is responsible for publishing the new or updated strategy, policy, or plan document on the council’s website.  They are also responsible for
ensuring that documents published comply with accessibility requirements for public sector bodies, the council’s corporate branding guidelines, and that the relevant key
words are used to ensure search functions can easily locate a strategy, policy, or plan.

Page 31

25 
Appendix B:  Review programme 
The following provides an indicative timetable outlining when an updated strategy, policy, or plan will be reported to the respective committee following completion of the review process. It should be noted that this review programme only
refers to substantial updates to the respective strategy, policy, or plan document which are required to re-iterate the intent halfway through the lifespan of the document for example, or because the document has reached the end of its life. 
It does not capture supporting action plans which are reviewed and updated annually through other means. 
The timescale between the date the review is scheduled to take place and approval at committee may vary depending on the extent of the review and engagement process that requires to be undertaken for a specific strategy, policy, or
plan.  As a rule of thumb all updated strategies, policies, and plans require to be presented to the relevant committee within three months of the conclusion of the review process. 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of document
/ 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2023
Cycle 2
Apr - Jun
2023
Cycle 3
Aug - Sept
2023
Cycle 4
Oct - Dec
2023
Cycle 1
Jan - Mar
2024
2024/25 2025/26
The Plan for North Lanarkshire
The Plan for North Lanarkshire sets the long-term strategic
direction for the council, partners, and other stakeholders and,
most importantly, for each unique local community and the
people who Live, Learn, Work, Invest, and Visit within North
Lanarkshire.  It’s a Plan with a shared ambition of inclusive
growth and prosperity for all and a fairer distribution of wealth
across all local communities.
28-02-19
The Plan for North
Lanarkshire
https://mars.northlanarkshire.gov.uk
/egenda/images/att90076.pdf 
https://www.northlanarkshire.gov.uk
/your-council/council-strategies-
and-plans/council-strategies/plan-
north-lanarkshire (strategy
document)
Strategy has no timeframe 
The Programme of Work,
updated annually, provides the
delivery and review mechanism 
Chief Executive Policy and Strategy
Committee
Financial Strategy
As the overarching framework that establishes the financial
strategies and policies which ensure effective financial
governance, planning, and management, this sets out the
responsibility for safeguarding public funds within North
Lanarkshire Council and the role of the Section 95 Officer.  
The financial strategies and policies covered by the Financial
Strategy are the Capital Strategy, Treasury Management
Strategy, Revenue Resources Budget Strategy, Medium-
Term Financial Plan, and the Financial Regulations and
Scheme of Financial Delegation.
The financial strategies and policies covered by the Financial
Strategy are set out therein along with timescales for further
review.  All have an annual review frequency and are covered
by the Strategic Governance Framework annual Review
Programme.
06-06-19
Financial Strategy
https://mars.northlanarkshire.gov.uk
/egenda/images/att90922.pdf 
Strategy has no timeframe for
review.
A review was carried out in
August 2022.  At this time the
Corporate Management Team
concluded the Strategy remains
relevant in its current form and
no further update requires to be
undertaken at this time. 
Chief Officer
(Finance)
Policy and Strategy
Committee
Corporate Communications Strategy
The overarching Communications Strategy covers the whole
organisation and aims to ensure that communication activity
closely aligns with delivery of The Plan for North Lanarkshire. 
All major activity must support an ambition statement and also
align with the core narrative which supports the Live, Learn,
Work, Invest, and Visit brand strategy. The council has
approved The Plan for North Lanarkshire and The Place, The
Vision and these are the council’s priorities and therefore the
focus for communications activity.
In order to maximise communication support for the council’s
priorities and ambitions, the Communications Strategy sets
out the key strategic principles of council communication. So
that the implementation of communication activity can be
appropriately prioritised in line with the strategy and can be
measured for effectiveness, an annual communications plan
sets out communications activities for each year.
06-06-19
Corporate Communications
Strategy
https://mars.northlanarkshire.gov.uk
/egenda/images/att90957.pdf 
Strategy has no timeframe 
Action plan updated annually 
Chief Officer 
(Strategic
Communication and
Engagement)
Policy and Strategy
Committee
Equality Strategy

Page 32

26 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of document
/ 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2023
Cycle 2
Apr - Jun
2023
Cycle 3
Aug - Sept
2023
Cycle 4
Oct - Dec
2023
Cycle 1
Jan - Mar
2024
2024/25 2025/26
The Equality Strategy sets out the council’s commitment to
equality and human rights and its clear understanding of the
disadvantage and inequality that exists for some people and
communities. Through five working objectives for success, the
strategy outlines how equality will continue to be part of the
everyday work of the council thereby ensuring a
mainstreamed approach.
26-08-19
Equality Strategy 2019-24
https://mars.northlanarkshire.gov.uk
/egenda/images/att91522.pdf 
5 year strategy 
Strategy document reviewed /
updated when it reaches the end
of its current life 
2024/25     
X  Chief Officer
(People Resources)
Wellbeing and
Tackling Poverty
Committee
Workforce for the Future Strategy
The Workforce for the Future Strategy approved in March
2020 covers the period 2020-23.   This strategy was
subsequently refreshed in June 2021 and realigned in light of
the pandemic, which continues to have a major impact on
levels of employment and the needs of employers across
North Lanarkshire. It also addresses the issue that the
pandemic is expected to have adversely affected the wider
employment, training, and progression prospects of young
people and other residents who have been made redundant
or may be at risk.
03-06-21
Workforce for the Future
Strategy
https://mars.northlanarkshire.gov.uk
/egenda/images/att96241.pdf 
19-03-20
Workforce for the Future
Strategy 2020-23
https://mars.northlanarkshire.gov.uk
/egenda/images/att92786.pdf
3 year strategy 
Annual review of strategy
document 
Autumn / Winter 2023   
X    Chief Officer
(People Resources)
Policy and Strategy
Committee
Workforce Mental Health and Wellbeing Strategy
The council recognises that mental ill health and stress can
be associated with many of the leading causes of disease and
disability in society. Promoting and protecting the mental
wellbeing of the workforce is important for individuals’
physical health, social wellbeing, and productivity. Mental
wellbeing in the workplace is relevant to all employees and
everyone can contribute to improved mental wellbeing at
work.
27-05-21
Mental Health and Wellbeing
Strategy
https://mars.northlanarkshire.gov.uk
/egenda/images/att96130.pdf
Strategy has no timeframe 
Annual review and update of
strategy document 
2022 refresh scheduled to be
reported in cycle 2 of 2023 
X      Chief Officer
(People Resources)
Finance and
Resources
Committee /
Wellbeing and
Tackling Poverty
Committee
Procurement Strategy
Legislation requires Scottish public bodies with annual
procurement spend greater than £5 million (which includes
the council) to develop and publish an organisational
procurement strategy and keep the strategy under regular
review. 
14-09-22
Procurement Strategy 2023-
24
https://mars.northlanarkshire.gov.uk
/egenda/images/att98662.pdf 
1 year strategy 
Annual review 
September 2023   
X    Chief Officer
(Assets and
Procurement)
Finance and
Resources
Committee
Digital and IT Strategy
IT and digital are integral to the future success of The Plan for
North Lanarkshire, and the Digital and IT Strategy 2019-24
highlights how technology will be used to transform service
delivery and deliver on the vision for a Digital North
Lanarkshire with Digital Communities, a Digital Economy, and
a Digital Council.
The strategies and policies covered by the Digital and IT
Strategy are the Acceptable Use of ICT Policy, Information
Governance Policy Framework, Data Protection Policy,
Information Security Policy, Records and Information
Management Policy, and Records Management Plan.
The strategies and policies covered by the Digital and IT
Strategy are set out therein along with timescales for further
review.  
23-02-22
Digital and IT Strategy,
annual refresh
https://mars.northlanarkshire.gov.u
k/egenda/images/att97664.pdf   
https://www.northlanarkshire.gov.uk
/your-council/council-strategies-
and-plans/council-strategies/digital-
and-it-strategy 
5 year strategy 
Strategy document fully
reviewed / updated when it
reaches the end of its current life
in 2023/24 
Regular update of strategies and
policies within the Digital and IT
Strategy are covered by the
Strategic Governance
Framework annual review
programme    
X   Chief Officer
(Business and
Digital)
Policy and Strategy
Committee
Risk Management Strategy
Effective risk management arrangements form an important
element of good corporate governance and are designed to
ensure that the council operates systematic and logical
processes for managing business risks within a
comprehensive framework, ensuring that identified risks are
managed consistently, effectively, efficiently, and coherently
across the organisation.
19-03-20
Risk Management Strategy
2019/20-2021/22 
https://mars.northlanarkshire.gov.u
k/egenda/images/att93523.pdf 
3 year strategy 
Biennial review 
Winter 2022/23
X       Chief Officer (Audit
and Risk)
Policy and Strategy
Committee

Page 33

27 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of document
/ 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2023
Cycle 2
Apr - Jun
2023
Cycle 3
Aug - Sept
2023
Cycle 4
Oct - Dec
2023
Cycle 1
Jan - Mar
2024
2024/25 2025/26
Internal Audit Strategy
The Internal Audit Strategy is designed to clearly set out
Internal Audit’s strategic objectives and outline briefly in clear
and concise terms how these strategic objectives will be
delivered. It is considered that such a statement benefits both
key stakeholders and Internal Audit staff, by providing a
clearer overview of what Internal Audit is trying to achieve,
and how, and by establishing key principles against which the
performance of Internal Audit can be better assessed.
27-06-19
Internal Audit Strategy
2019/20 - 2021/22
https://mars.northlanarkshire.gov.u
k/egenda/images/att91026.pdf 
3 year strategy 
Biennial review 
2022/23   
X    Chief Officer (Audit
and Risk)
Audit and Scrutiny
Panel
Events Strategy
The council has an extensive history of hosting and promoting
successful events. Events make a contribution to the local
economy through tourism and expenditure in the local area
and through the supply chain. They provide recreational and
volunteering opportunities for local people and, at their
biggest, give North Lanarkshire a national and international
profile. While the council has staged many successful events,
a formal Events Strategy ensures the council, working with its
partners, maximises the potential of North Lanarkshire as a
destination of choice for hosting events.
06-06-19
Events Strategy
https://mars.northlanarkshire.gov.u
k/egenda/images/att91094.pdf
Strategy has no timeframe  Chief Officer 
(Strategic
Communication and
Engagement)
Policy and Strategy
Committee
Diet and Nutrition Policy
Improving the health and wellbeing of local communities is a
key aspect to achieve one of the five priorities set to realise
the shared ambition through empowering people to make
healthier choices. This policy demonstrates the council’s
commitment to improving the diet and nutrition of its service
users, residents, and staff. In 2000, the council was one of the
first local authorities in Scotland to develop a policy in relation
to diet and nutrition which was subsequently updated after a
significant number of developments were made both
nationally and locally tackling Scotland’s high levels of
overweight and obesity.
An update is required to reflect Natasha’s Law, Nutritional
Requirements for Food and Drink in Schools (Scotland)
regulations 2020, and the Good Food Nation (Scotland) Act
2022.  Other items to be considered will be the Deposit
Return Scheme and Setting the Table guidelines which are
currently under review.
19-03-20
Diet and Nutrition Policy
2019-24 
https://mars.northlanarkshire.gov.u
k/egenda/images/att93587.pdf
5 year policy 
Update scheduled for cycle 3 in
2023  
X     Chief Officer
(Assets and
Procurement) 
Policy and Strategy
Committee
Climate Plan, Action on Climate Together 2030
The finalised Climate Plan ACT2030 is the first of an intended
series of climate-related documents that encompass the
council’s own climate emergency declaration and subsequent
target of net-zero emissions by 2030. The climate plan
provides targets from 2021/22 to 2025/26 with a commitment
to continually review and set targets beyond this to 2030.
09-02-22
Climate Plan, Action on
Climate Together 2030 
https://mars.northlanarkshire.gov.u
k/egenda/images/att97673.pdf 
5 year strategy 
Action plan reviewed annually 
X   Chief Officer
(Assets and
Procurement)
Environment and
Climate Change
Committee
Corporate Asset Management Plan
The Corporate Asset Management Plan (CAMP) provides an
overview of how the council is managing its assets in
alignment with the strategic direction of the organisation to
both deliver and sustain an asset base that will meet current
and future requirements. The CAMP is one of the tools used
to manage the asset base and guide activities (i.e. maintain,
rationalise, invest, dis-invest); it links into the ongoing review
and development of the 5 year capital plan.
14-09-22
Corporate Asset
Management Plan (CAMP)
2021-26
https://mars.northlanarkshire.gov.u
k/egenda/images/att98661.pdf 
5 year strategy 
Strategy document to be
reviewed annually 
September 2023     
X  Chief Officer
(Assets and
Procurement)
Policy and Strategy
Committee
Housing Asset Management Plan

Page 34

28 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of document
/ 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2023
Cycle 2
Apr - Jun
2023
Cycle 3
Aug - Sept
2023
Cycle 4
Oct - Dec
2023
Cycle 1
Jan - Mar
2024
2024/25 2025/26
The council’s Housing Asset Management Plan (HAMP)
2021-26 provides an overview of Homes Fit for the Future.  
It aligns with the Local Housing Strategy and other council
strategies and provides the strategic framework for asset
management activities and investment over the next five
years.  There are four key priorities to guide activities:
• We help deliver the homes NL needs to grow.
• We provide high-quality, well-maintained homes.
• We tackle climate change and fuel poverty.
• We improve our systems and our use of data.
17-02-21
Housing Asset Management
Plan 2021-26
https://mars.northlanarkshire.gov.u
k/egenda/images/att95628.pdf 
5 year plan 
Strategy document reviewed /
updated when it reaches the end
of its current life 
2026      
X Chief Officer
(Housing Property
Services)
Housing Committee
Community Safety Strategy
The Community Safety Strategy recognises that community
safety is set within a broad context of enabling communities to
be resilient and safe, through effective engagement and
empowerment, and that much wider social, economic and
physical factors all impact on community safety.
This strategy aims to ensure a holistic, integrated approach
across partners to address the needs of communities in North
Lanarkshire, recognising the broad spectrum of activity that
contributes to community safety. The strategy also comprises
the Antisocial Behaviour Strategy for North Lanarkshire as
required by the Antisocial Behaviour etc. (Scotland) Act 2004
due to the inter-connectedness of tackling antisocial
behaviour with the other community safety strands and
benefits of considering all of these strands together to better
utilise and target resources and activity as a partnership.
01-02-21
Improving Community Safety
in North Lanarkshire: A
Strategy to Improve Lives
2020-25
https://mars.northlanarkshire.gov.u
k/egenda/images/att95460.pdf
5 year strategy 
Strategy document reviewed /
updated when it reaches the end
of its current life 
2024/25 
X  Chief Officer
(Strategic
Communication and
Engagement)
Communities
Committee
Community Matters - a Framework for Working with Communities
The Working with Communities Framework has been
developed to guide engagement approaches to ensure a more
streamlined approach to community participation and
empowerment. This reflects not just the strategic context for
the council and Community Planning Partnership but also the
requirements of key national drivers for community
empowerment, including the Principles for Community
Empowerment published by Audit Scotland.
26-08-19
Community Matters - a
Framework for Working with
Communities 
https://mars.northlanarkshire.gov.u
k/egenda/images/att91527.pdf
Strategy has no timeframe 
Review / update will be
undertaken in 2023/24 in line
with partnership
Communications Strategy 
X   Chief Officer
(Strategic
Communication and
Engagement)
Communities
Committee
Environment Pathway
The council has a number of strategies, action plans, and
policies which contribute to the development and protection of
North Lanarkshire’s environment. The reconfiguration of the
Environment Strategy into an Environment Pathway aligns all
of these under one strategic approach to ensure these related
strategies, policies, and plans are not implemented in
isolation, but take account of common environmental factors
locally and collectively aim to protect, enhance, and promote
North Lanarkshire’s environment.
This document also comprises those strategies or duties
required by legislation (including the Contaminated Land
Strategy, Air Quality Action Plan, Core Paths Plan, Food
Growing Strategy, and Single Use Plastics Plan).
01-05-19
Environment Strategy
https://mars.northlanarkshire.gov.u
k/egenda/images/att90497.pdf 
Document has no timeframe 
Review / update will be
undertaken in 2022/23, with a
biennial review period to be in
place thereafter 
X      Chief Officer
(Community
Operations)
Environment and
Climate Change
Committee
Active Travel Strategy
This strategy puts in place for the first time, a cohesive and
holistic framework to prioritise and accelerate active travel
interventions across North Lanarkshire. These will align with
the Town Visions and Town and Community Hub
development to provide better active travel networks between
local communities and across the local authority boundary.
This will also help to deliver improved health and well-being
25-08-21
Active Travel Strategy 2021-
31 
https://mars.northlanarkshire.gov.u
k/egenda/images/att96653.pdf 
10 year strategy 
Strategy document reviewed /
updated when it reaches the end
of its current life       
Chief Officer (Place) Environment and
Climate Change
Committee

Page 35

29 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of document
/ 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2023
Cycle 2
Apr - Jun
2023
Cycle 3
Aug - Sept
2023
Cycle 4
Oct - Dec
2023
Cycle 1
Jan - Mar
2024
2024/25 2025/26
and environmental, social inclusion, and public access
benefits.
Local Transport Strategy
Robust transport networks play a significant part in delivering
the ambition to make North Lanarkshire the place to live,
learn, work, invest, and visit.
The Local Transport Strategy sets out how national objectives
are delivered at a local level. There are four objectives within
the strategy:
• To stimulate business and the economy and develop North
Lanarkshire as an attractive place to invest, work, and do
business.
• To provide equal opportunities and enhance the choice,
accessibility, and availability of transport, particularly for
those in deprived areas and those with limited access to
the transport network.
• To promote safety in the community and enhance safety
when travelling on the transport network.
• To protect North Lanarkshire's natural built environment
and to improve the health of the local population.
Local Transport Strategy
https://www.northlanarkshire.gov.u
k/sites/default/files/2020-
06/Local%20Transport%20Strateg
y%202010.pdf 
Strategy undergoing review and
further development work during
2023 with a view to reporting on
an updated strategy in 2024.     
X  Chief Officer (Place) Environment and
Climate Change
Committee
Local Development Plan
The North Lanarkshire Local Development Plan is the land
use planning strategy for North Lanarkshire. A strategy is a
plan of action designed to achieve a long term or overall aim -
the long-term aim is to increase sustainable growth and
regeneration, and to improve places in support of the council’s
long-term vision. The Local Development Plan looks to
achieve this through policies used to determine applications
for planning permission.
30-06-22
North Lanarkshire Local
Development Plan Update
and Development Plan
Scheme 2022
https://mars.northlanarkshire.gov.u
k/egenda/images/att98278.pdf 
https://www.northlanarkshire.gov.u
k/sites/default/files/2022-
11/North%20Lanarkshire%20Local
%20Development%20Plan.pdf 
Work will commence on a new
LDP in 2022/23 with anticipated
approval of Proposed LDP
expected 2025/26.  Adoption of
new LDP thereafter expected
2026/27.      
X Chief Officer (Place) Full Council
Indicative Regional Spatial Strategy (RSS)
As part of the new Planning system and following
Parliamentary approval of NPF4, the Scottish Government will
invite regional groupings of Planning Authorities to prepare a
non-statutory Regional Spatial Strategy. RSSs can identify
areas for future population growth, align with regional
economic strategies, and identify key sectors and clusters for
future development and investment along with networks of
regionally significant centres, growth, and investment areas.
There will be no requirement for council approval of this
strategy; separate governance arrangements will be in place
regionally.  
This strategy is included here for completeness as the Local
Development Plan will be required to have regard to it.
N/A National guidance has still to be
provided - publication date has
still to be confirmed.    
X   Chief Officer (Place) N/A
Approved through
governance
arrangements at a
regional level
Glasgow City Region Economic Strategy
The economic strategy for Glasgow City Region - launched in
December 2021 - is set to have a profound impact on wider
public sector policy, decision-making, and spend over the next
ten years for the local area of 1.8 million residents and 50,000
businesses.
The strategy sets the approach for how the Glasgow City
Region will weather current and future key challenges, some
of which are expected to completely disrupt everyday ways of
life - including the impact of the pandemic, the climate
emergency, and unprecedented technological advances.
December 2021
Glasgow City Region
Economic Strategy
https://glasgowcityregion.co.uk/wp-
content/uploads/2021/12/GCR-
EconomicStrategy-Final.pdf 
10 year Strategy with Action
Plan to be developed and
reviewed annually         
Chief Officer (Place) N/A
Approved through
Glasgow City
Region Cabinet

Page 36

30 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of document
/ 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2023
Cycle 2
Apr - Jun
2023
Cycle 3
Aug - Sept
2023
Cycle 4
Oct - Dec
2023
Cycle 1
Jan - Mar
2024
2024/25 2025/26
The approach is a first in that it has been developed and
endorsed not only by the Region’s eight councils (Glasgow,
East Dunbartonshire, East Renfrewshire, Inverclyde, North
Lanarkshire, Renfrewshire, South Lanarkshire and West
Dunbartonshire), but by government and wider public sector
agencies including Scottish Enterprise and Skills Development
Scotland - all of which will be instrumental in its delivery.
There will be no requirement for council approval of this
strategy; separate governance arrangements are in place
through the Glasgow City Region Cabinet.  
This strategy is included here for completeness as it aligns to
the City Deal programme. 
North Lanarkshire Tourism Strategy
This strategy sets out the aspirations for a shared vision that
by 2026 North Lanarkshire will be a sustainable, resilient
tourist destination offering a range of authentic and
memorable experiences which provide value for money and
are accessible to all.
The strategy captures current service provision and supports
the recovery and growth of the tourism and leisure sector in
North Lanarkshire. The Action Plan sets out how the aims of
the strategy will be met. The Action Plan will be reviewed
annually to ensure it continues to achieve the vision outlined
in the Tourism Strategy in the short, medium, and long-term.
03-02-22
Tourism Strategy and Action
Plan 2022-26
https://mars.northlanarkshire.gov.u
k/egenda/images/att97636.pdf 
4 year strategy 
Action plan reviewed / updated
annually 
2025/26 
X Chief Officer (Place) Enterprise and Fair
Work Committee
Economic Regeneration Delivery Plan (ERDP)
The ERDP is a high-level framework which is aligned to the
composite capital programme and delivers on the first priority
of The Plan for North Lanarkshire to improve economic
outcomes and opportunities. This will be achieved by
delivering an integrated approach to investing in four key
inter-related areas: 
• Housing supply.
• Town centres.
• Business and industry.
• Infrastructure and coherently across the organisation.
29-08-19
Economic Regeneration
Delivery Plan 2019-23
https://mars.northlanarkshire.gov.u
k/egenda/images/att91554.pdf 
5 year strategy 
Action plan reviewed / updated
annually through the
Programme of Work 
Updated ERDP for 2023-28 is
scheduled to be submitted to
committee in cycle 1 of 2023
X       Chief Officer (Place) Enterprise and Fair
Work Committee
Business and Industry Strategy
The ERDP recognises that improving and extending North
Lanarkshire’s business and industrial offer is essential to
supporting economic growth. While work is ongoing to support
and enable the development of North Lanarkshire’s key
business locations, and initiatives are being developed to
assist with improvements to existing estates, it has been
identified that there is a need to develop a more strategic
approach.  
This will be achieved through the establishment of a cohesive
Business and Industry Strategy which is closely linked to work
programmes for business support and skills development. 
This will ensure any investment in business infrastructure can
promote both business growth and local employment
opportunities.
The Business and Industry Strategy will provide the evidence
base to help inform / prioritise future public sector investment
and inform the next Local Development Plan in terms of
employment land allocation, as well as inform business
engagement that is part of the Workforce for the Future
programme. 
N/A New 5 year strategy will be
developed and reported to
committee in cycle 3 of 2023. 
X     Chief Officer (Place) Enterprise and Fair
Work Committee
North Lanarkshire Social Enterprise Framework

Page 37

31 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of document
/ 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2023
Cycle 2
Apr - Jun
2023
Cycle 3
Aug - Sept
2023
Cycle 4
Oct - Dec
2023
Cycle 1
Jan - Mar
2024
2024/25 2025/26
This framework sets out the shared vision for a competitive
and dynamic Social Enterprise sector in North Lanarkshire
which supports inclusive and green growth, delivering
innovative solutions and proactive responses to local needs
and maximising local public and private procurement
opportunities. It captures current service provision and
supports the recovery and growth of the sector through three
key themes: stimulating the sector, developing stronger
organisations, and realising market opportunities. 
The Action Plan sets out how the aims of the Framework will
be met. The Action Plan will be reviewed annually to ensure it
continues to achieve the vision outlined in the Framework in
the short, medium, and long-term.
03-02-22
North Lanarkshire Social
Enterprise Framework 2022-
26
https://mars.northlanarkshire.gov.u
k/egenda/images/att97637.pdf 
4 year strategy 
Action plan reviewed / updated
annually 
2025/26      
X Chief Officer (Place) Enterprise and Fair
Work Committee
Open Space Strategy
Open space strategies are a statutory requirement under the
provisions of the new Planning (Scotland) Act 2019.  An Open
Space Strategy will require a strategic framework to be set out
which comprises the council’s policies and proposals
regarding the development, maintenance, and use of green
infrastructure (including open spaces and green networks).  
The legislation requires that an open space strategy is
underpinned by an audit of existing open space and play
provision, an assessment of current and future requirements,
and any other matter the council considers appropriate.
Guidance on the requirements of the open space audit and
open space strategy (linked to NPF4 and guidance for the
preparation of future Local Development Plans) and Play
Sufficiency Assessments was published for consultation in
late 2021 and has still to be finalised. Indicative timescales are
subject to change, but work is already underway, in
consultation and with the assistance of Greenspace Scotland,
to prepare for the audit and provide a bank of local data.  This 
will be an invaluable resource that can be used to inform the
council’s strategic direction.
The audit will then inform requirements for retention,
enhancement, replacement, re-purposing, or disposal of a
range of places, spaces, and connections. This will allow for
the combination of new and existing networks to form an
integrated network of connected places and spaces across
North Lanarkshire’s communities.
N/A New strategy currently under
development; an update on
progress will be provided in
cycles 1 and 4 of 2023 
X   X    Chief Officer (Place) Policy and Strategy
Committee
Strategic Activity Framework
Developed through the North Lanarkshire Partnership, the
Physical Activity and Sport Strategic Framework puts North
Lanarkshire in a great position to help everyone become more
active.  This framework has set some ambitious targets to
help improve the health and increase the physical activity
levels of all. Following the formation of Active and Creative
Communities, the focus of the strategy and action plan has
been redeveloped to reflect the importance of cultural activity
on overall wellbeing.
24-08-20
ActiveNL North
Lanarkshire’s Physical
Activity Strategic Framework
2020-24
https://mars.northlanarkshire.gov.u
k/egenda/images/att94260.pdf
5 year strategy 
Strategy document reviewed /
updated when it reaches the end
of its current life 
Action plan reviewed / updated
annually   
X    Chief Officer
(Education)
Communities
Committee
Local Housing Strategy
The Housing (Scotland) Act 2001 places a statutory
requirement on local authorities to produce a Local Housing
Strategy (LHS) that sets out the strategy, priorities, and plans
for the delivery of housing and related services. The 2001 Act
states that the LHS must be supported by an assessment of
housing provision including the need and demand for housing
and related services and that local authorities must keep their
24-11-21
Housing Strategy 2021-26
https://mars.northlanarkshire.gov.u
k/egenda/images/att97233.pdf 
https://www.northlanarkshire.gov.u
k/sites/default/files/2021-
Five year strategy 
Annual review with progress on
the delivery of the action plan
reported to committee annually 
2025/26      
X Chief Officer
(Housing
Management)
Housing Committee

Page 38

32 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of document
/ 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2023
Cycle 2
Apr - Jun
2023
Cycle 3
Aug - Sept
2023
Cycle 4
Oct - Dec
2023
Cycle 1
Jan - Mar
2024
2024/25 2025/26
LHS under review.  Nationally there is an expectation that
councils prepare and submit LHSs every five years and there
is a requirement to provide a focus on housing supply,
homelessness, property condition, energy efficiency, fuel
poverty, and older people's and specialist provision housing.  
In North Lanarkshire, the Local Housing Strategy is at the
heart of arrangements for housing and planning through its
links with the Local Development Plan, as well as its strategic
role in directing investment in housing and housing related
services locally. It sets out a strategic vision for the delivery of
housing and housing related services. 
11/Local%20Housing%20Strategy
%202021-2026.pdf  
Tenant Participation Strategy
There is a statutory requirement under The Housing
(Scotland) Act 2001, Section 53 (1) which sets out the duty for
social landlords to develop and publish a Tenant Participation
Strategy in consultation with tenants.  The Housing (Scotland)
Act 2010 places additional duties on social landlords to
involve both tenants and other customers in housing and
related activities.
The Tenant Participation Strategy 2020-25 (Involving Tenants
- Improving Services) replaces the previous strategy and is
the main source of information regarding tenant participation;
it outlines opportunities to participate in the monitoring and
development of the housing service.  The aim of this strategy
is to continue to develop and improve how the council
communicates with tenants and residents and ensure
opportunities are provided for participation and involvement
that are accessible to all.
19-02-20
Tenant Participation Strategy
2020-25
https://mars.northlanarkshire.gov.u
k/egenda/images/att93095.pdf 
https://www.northlanarkshire.gov.u
k/sites/default/files/2021-
02/CC_2020_00220%20Tenant%2
0Participation%20Strategy%20Acc
essible%20PDF%20conversion.pdf
5 year strategy 
Annual review with progress on
the delivery of the action plan
reported to committee annually 
2024/25     
X  Chief Officer
(Housing
Management)
Housing Committee
Rapid Rehousing Plan
Transitioning to rapid rehousing is an opportunity for the
council and partners to redress the balance of housing and
support options relating to availability and accessibility for
homeless households.  The Rapid Rehousing Transition Plan
sets out how the council and partners will move forward from
the current position to deliver the future model.  
The plan provides a guide as to how to move homeless
households into settled housing as quickly as possible.
14-11-18
Rapid Rehousing Transition
Plan 2019-24
https://mars.northlanarkshire.gov.u
k/egenda/images/att88989.pdf 
5 year plan 
Annual review with progress on
the delivery of the action plan
reported to committee annually 
2024/25 
X  Chief Officer
(Housing
Management)
Housing Committee
Tenant Sustainment Policy
The Tenancy Sustainment Policy has been developed in
response to the continued focus on tenancy sustainment,
particularly at a time when many tenants and residents are
facing extreme pressures and may require assistance. The
intention is to provide a clear overarching framework which
sets out the council’s proactive approach to tenancy
sustainment and its commitment to preventing homelessness
whenever possible.
31-08-22
Tenant Sustainment Policy
https://mars.northlanarkshire.gov.u
k/egenda/images/att98401.pdf
Policy has no timeframe 
Annual review 
September 2023       
Chief Officer
(Housing
Management)
Housing Committee
Housing Domestic Abuse Policy           
This policy sets out the council’s approach to providing a co-
ordinated response to the accommodation and support needs
of women and children affected by domestic abuse and sets
out the recognition that violent and abusive behaviour is
predominantly carried out by men directed at women and girls
because of their gender, and this stems from deep-rooted
women’s inequality. However, it also recognises that domestic
abuse can also affect men, transgender, and gender non-
binary people and, as such, the policy applies equally to
anyone affected by domestic abuse.
31-08-22
Housing Domestic Abuse
Policy
https://mars.northlanarkshire.gov.u
k/egenda/images/att98400.pdf
Policy has no timeframe 
Annual review 
September 2023       
Chief Officer
(Housing
Management)
Housing Committee

Page 39

33 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of document
/ 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2023
Cycle 2
Apr - Jun
2023
Cycle 3
Aug - Sept
2023
Cycle 4
Oct - Dec
2023
Cycle 1
Jan - Mar
2024
2024/25 2025/26
Domestic abuse is a significant cause of homelessness
among women and the policy sets out the assurance to
prevent homelessness where possible, recognising the
potential distress and trauma associated with moving into
temporary accommodation or moving to an unfamiliar area
away from existing support networks. It also emphasises the
importance of understanding different needs and
circumstances.
Health and social care strategic plan
In presenting this ten year strategic plan, the aim was to set in
motion an approach to delivering health and social care that
will lead over time to achieving the national health and
wellbeing outcomes prescribed in the Public Bodies (Scotland)
Act 2014 and the outcomes linked to The Children and Young
People’s (Scotland) Act 2014 and the Community Justice
(Scotland) Bill.
08-03-16 (the plan was signed
off by the Shadow IJB on 8th
March 2016)
Integrating Health and Social
Care in North Lanarkshire -
Strategic Plan 2016-26 
http://www.hscnorthlan.scot/wp-
content/uploads/2016/05/nlc_strat
_doc_v13.pdf 
10 year plan 
2026       
Chief Officer
(Health and Social
Care)
Integration Joint
Board
Health and Social Care Strategic Commissioning Plan
The Public Bodies (Joint Working) Scotland Act 2014 requires
each Integrated Joint Board to produce a Strategic Plan.
Health and Social Care North Lanarkshire published its ten-
year strategy Safer, Healthier, Independent Lives in 2016 and
each year since then an annual Strategic Commissioning Plan
has been produced to outline the key intentions to be
delivered in each year. 
A significant programme of engagement was undertaken to
support the creation of the partnership’s three-year Strategic
Commissioning Plan, covering the period of 2020-23. 
19-03-20
Health and Social Care
Strategic Commissioning
Plan 2020-23
https://mars.northlanarkshire.gov.u
k/egenda/images/att93528.pdf
3 year plan 
Strategy document reviewed /
updated when it reaches the end
of its current life 
2023/26 
X      Chief Officer
(Health and Social
Care)
Policy and Strategy
Committee /
Integration Joint
Board
North Lanarkshire Strategy for Adult Carers and Young Carers
The Carers (Scotland) Act 2016 came into effect on 1 April
2018 and introduced new statutory requirements for planning
and arranging support for unpaid Adult Carers and Young
Carers.  One of the key provisions of the legislation is a duty
on local authorities and health boards to prepare a carers
strategy for their area.
05-11-19
North Lanarkshire Strategy
for Adult Carers and Young
Carers 2019-24
https://mars.northlanarkshire.gov.u
k/egenda/images/att92598.pdf 
5 year strategy 
Strategy document reviewed /
updated when it reaches the end
of its current life 
2024/25 
X  Chief Officer
(Health and Social
Care)
Integration Joint
Board
Lanarkshire Mental Health and Wellbeing Strategy
The five-year strategy Lanarkshire Mental Health and
Wellbeing Strategy for all age groups is informed by a range of
work including the national Mental Health Strategy 2017-27
while reflecting the needs of people living in Lanarkshire and
importantly the experience of people using local services. 
This aims to ensure the promotion of mental health and
wellbeing underpins all aspects of support and services. 
The joint approach to developing the support and services
required when needed will ensure Lanarkshire becomes a
place that champions and promotes good mental health for all.
26-09-19 
Mental Health and Wellbeing
Strategy for Lanarkshire
2019-24
https://mars.northlanarkshire.gov.u
k/egenda/images/att92105.pdf
5 year strategy 
Strategy document reviewed /
updated when it reaches the end
of its current life 
2024/25     
X  Chief Officer
(Health and Social
Care)
Policy and Strategy
Committee
Tackling Poverty Strategy
North Lanarkshire’s Tackling Poverty Strategy reflects a
concerted commitment across the Community Planning
Partnership to drive inclusive growth and achieve prosperity
for the people and communities of North Lanarkshire - to
ensure that North Lanarkshire will be the place where
everyone has equality of opportunity, a place where
11-06-20
Towards a Fairer North
Lanarkshire - Tackling
Poverty Strategy 2020-23
https://mars.northlanarkshire.gov.u
k/egenda/images/att94019.pdf 
3 year strategy 
Strategy document reviewed /
updated when it reaches the end
of its current life 
X      Chief Social Work
Officer
Policy and Strategy
Committee

Page 40

34 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of document
/ 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2023
Cycle 2
Apr - Jun
2023
Cycle 3
Aug - Sept
2023
Cycle 4
Oct - Dec
2023
Cycle 1
Jan - Mar
2024
2024/25 2025/26
individuals and communities are poverty free. https://www.northlanarkshire.gov.u
k/sites/default/files/2020-
10/CC_2020_00040%20Tackling
%20Poverty%20Strategy%20Acce
sible%20Single%20Pages.pdf 
Action plan updated annually
Children’s Services Plan
This plan summarises the purpose and intentions of North
Lanarkshire Children's Services Partnership, on behalf of the
North Lanarkshire Partnership in the joint planning and
improvement of children's services in North Lanarkshire.
It provides an overview of partnership activity to deliver
services and supports for children, young people and their
families within the current legislative, wider planning, and
ongoing improvement framework. 
It identifies priorities and outcomes that are the basis for more
detailed planning expressed in supporting annual action plans. 
Planning and delivery to children, young people, and families
is further underpinned by the principles of the United Nations
Convention on the Rights of the Child (UNCRC). 
North Lanarkshire
Partnership Children’s
Services Plan 2021-23
https://www.northlanarkshire.gov.u
k/sites/default/files/2021-
08/North%20Lanarkshire%20Child
rens%20Services%20Plan%20202
1-2023.pdf 
3 year plan 
Plan reviewed / updated when it
reaches the end of its current life 
May 2023 
X      Chief Social Work
Officer
Children’s Services
Partnership Board
on behalf of the
North Lanarkshire
Partnership
(Endorsement by
the North
Lanarkshire
Partnership
Strategic
Leadership Board
and Education and
Families Committee
thereafter)
Community Justice Outcome Improvement Plan
Under section 17 of the Community Justice (Scotland) Act
2016, every local Community Justice Partnership must
produce a Community Justice Outcomes Improvement Plan.
The purpose of a Community Justice Outcomes Improvement
Plan is to provide an assessment of whether each outcome is
currently being achieved and to set out any actions for
improving outcomes.
The legislation specifies that the plan should include: 
• An assessment of each national outcome - the community
justice partners’ assessment of whether the outcome is
being achieved in the area (and, if not, how near the
outcome is to being achieved). 
• Priorities for action - whether the outcome requires to be a
priority for action. 
• Intended actions - the action they intend to take
(individually or jointly) to achieve or maintain achievement
of the outcome.
North Lanarkshire
Community Justice
Outcome Improvement Plan
2017-20
https://www.northlanarkshire.gov.u
k/sites/default/files/2020-
09/ACCESSIBLE%20North_Lanar
kshire_Community_Justice_Outco
me_Improvement_Plan.pdf 
3 year plan 
* Plan reviewed / updated when
it reaches the end of its current
life - however the current plan
has been extended several
times now due to the pandemic
and the national strategy and
framework review.  Further
guidance is awaited from the
Scottish Government /
Community Justice Scotland on
the impact of this on local
Community Justice Outcome
Improvement Plans. 
X *    Chief Social Work
Officer
Community Justice
Partnership Board
on behalf of the
North Lanarkshire
Partnership
(Endorsement by
the North
Lanarkshire
Partnership
Strategic
Leadership Board
and Education and
Families Committee
thereafter)
Corporate Parenting Strategy
The Children and Young People (Scotland) Act 2014 and
accompanying statutory guidance place duties on a range of
public bodies with respect to looked after children and young
people and care leavers. Collectively these duties are
designed to ensure organisations commit resource and focus
to promoting the wellbeing of looked after children and care
leavers. The duties on corporate parents outlined in Section 58
of the Act include the need to: 
• Be alert to matters which might adversely affect the
wellbeing of an eligible young person. 
• Assess the needs of eligible children and young people to
any service or support provided. 
• Seek to provide eligible children and young people with
opportunities to promote their wellbeing. 
• Keep their approach to corporate parenting under constant
review, seeking out improvement wherever possible.
In addition, corporate parents must collaborate with each
other, publish corporate parenting plans, and report at
prescribed intervals on these plans to Scottish Ministers.
21-05-19
Corporate Parenting
Strategy 2019-22
https://mars.northlanarkshire.gov.u
k/egenda/images/att90974.pdf 
https://mars.northlanarkshire.gov.u
k/egenda/images/att91013.pdf 
2 year strategy 
Supported by an Improvement
Plan which is updated annually. 
2022/23 
X      Chief Social Work
Officer
Education, Children,
and Families
Committee

Page 41

35 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of document
/ 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2023
Cycle 2
Apr - Jun
2023
Cycle 3
Aug - Sept
2023
Cycle 4
Oct - Dec
2023
Cycle 1
Jan - Mar
2024
2024/25 2025/26
Education and Families improvement plan
Scottish Attainment Challenge Plan 
The Scottish Attainment Challenge (SAC) is a major national
initiative designed to achieve equity in educational outcomes
by closing the poverty related attainment gap for children and
young people. The SAC focuses on accelerated, targeted
improvement activity in literacy, numeracy and health and
wellbeing in specific areas of Scotland. It supports and
complements the broader range of initiatives and programmes
to ensure that all of Scotland’s children and young people
reach their full potential. The 2021-22 Plan aligned the SAC
programme more closely with The Plan for North Lanarkshire
ensuring that the drive, vision and increased connectedness
maximises the impact of the approaches to closing the poverty
related attainment gap.
Moving forward, the SAC will be referred to as the SEF
(Strategic Equity Fund).
22-11-22
Strategic Equity Fund Plan 
https://mars.northlanarkshire.gov.u
k/egenda/images/att99342.pdf   
1 year plan 
Annual review and refresh 
2023 
x    Chief Officer
(Education)
Education, Children,
and Families
Committee
West Partnership Regional Improvement Plan
The West Partnership Regional Improvement Plan sets out the
key areas for collaborative action to drive improvement across
the Glasgow City Region. It sets out the West Partnership’s
offer to all eight local authorities and was developed in
response to stakeholder engagement highlighting the activities
which local authorities indicated they would benefit from. 
The plan is organised under three key areas, each led by two
Directors of Education / Chief Education Officers - wellbeing
for learning; curriculum, learning, teaching, and assessment;
and leadership, empowerment, and improvement.
A range of programmes and activities are in place across the
three identified areas that are designed to support the work of
school staff and local authority central officers.  A fourth
workstream, also led by two Directors of Education, is that of
evaluation and reporting.
22-11-22
West Partnership
Improvement Plan 2022/23
https://mars.northlanarkshire.gov.u
k/egenda/images/att99464.pdf 
1 year plan 
Annual evaluation and
improvement plan 
2023   
x    Chief Officer
(Education)
Education, Children,
and Families
Committee
Mental Health, Wellbeing, and Resilience
The Roadmap to Recovery plan sets out a way forward in
developing the health and wellbeing of learners over the next
three years recognising the current context in North
Lanarkshire, particularly following the impact of the pandemic.
The plan recognises the importance of developments in North
Lanarkshire in relation to health and wellbeing including the
Empowering Clusters model and the Getting it Right for Every
Child (GIRFEC) pathway. It looks at high level outcomes that
can be improved, linking into the Children’s Services Plan and
The Plan for North Lanarkshire.
13-09-22
Health and Wellbeing
Roadmap to Recovery
https://mars.northlanarkshire.gov.u
k/egenda/images/att98679.pdf  
3 year plan 
Annual progress review 
2024/25 
x  Chief Officer
(Education)
Education, Children,
and Families
Committee
Gaelic Language Plan
Local authorities are required to produce a Gaelic Language
Plan (GLP) every five years detailing how the language will be
developed across all sectors in accordance with the national
plan (https://www.gaidhlig.scot/en/gaelic-language-plans/the-
national-gaelic-language-plan/) 
The council’s Gaelic Language plan for 2021-26 aligns to the
national plan, with three high level aims to increase the use of
Gaelic, increase the learning of Gaelic, and promote a positive
image of Gaelic.  These aims cover all aspects of the
provisions made for increasing the cachet and visibility of
Gaelic language and culture, for enhancing and expanding the
educational offer to children and adults, and for engaging with
stakeholders to identify their wants and needs in relation to
Gaelic.
23-02-21
Developing Gaelic language
provision and approval of
high level aims and direction
for the third edition of the
plan
https://mars.northlanarkshire.gov.u
k/egenda/images/att95684.pdf 
5 year plan 
Plan reviewed / updated when it
reaches the end of its current life 
2025/26      
x Chief Officer
(Education)
Education, Children,
and Families
Committee

Page 42

36 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of document
/ 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2023
Cycle 2
Apr - Jun
2023
Cycle 3
Aug - Sept
2023
Cycle 4
Oct - Dec
2023
Cycle 1
Jan - Mar
2024
2024/25 2025/26
Community Learning and Development Partnership Plan
The North Lanarkshire Community Learning and Development
Partnership was formally created in 1999, in response to
Scottish Government’s Communities: Change through
Learning report. The partnership brings together local
organisations with responsibility for community-based learning
and capacity building.
The Requirements for Community Learning and Development
(Scotland) Regulations (2013) introduced a legal requirement
for partners to jointly produce a Community Learning and
Development plan every three years, as further detailed in the
Strategic Guidance for Community Planning Partnerships:
Community Learning and Development (2012) and
subsequent national guidance. 
The North Lanarkshire Community Learning and Development
Partnership’s current plan runs from 2021-24; it encompasses
the three delivery plans (for adult learning, youth work, and
family learning) which reflect the themes of community
learning and development.
23-08-21
North Lanarkshire
Community Learning and
Development Partnership
Plan 2021-24
https://mars.northlanarkshire.gov.u
k/egenda/images/att96635.pdf 
3 year plan 
Plan reviewed / updated when it
reaches the end of its current life 
2024 
X  Chief Social Work
Officer
Communities
Committee
Community Learning and Development Action Plan
This plan outlines the priority actions and milestones for the
council’s community learning and development work through
the three teams - adult learning and resettlement, family
learning, and youth work.  It reflects the ambitions of The Plan
for North Lanarkshire, the aims of the Community Learning
and Development Partnership Plan 2021-24 as well as
national plans and policies which affect the provision of
community learning and development services.
For 2022-24, the previously separate delivery plans for adult
learning, family learning, and youth work are now integrated
within the one plan.
24-08-20
Adult Learning Delivery
Plan 2020-22
https://mars.northlanarkshire.gov.u
k/egenda/images/att94266.pdf 
24-08-20
North Lanarkshire Family
Learning Delivery Plan 2020-
22
https://mars.northlanarkshire.gov.u
k/egenda/images/att96629.pdf 
24-08-20
North Lanarkshire Youth
Work Interim Recovery and
Renewal Plan 2020-22
https://mars.northlanarkshire.gov.u
k/egenda/images/att94265.pdf
New integrated plan will be
presented to committee in cycle
2 of 2023 
Biennial review 
2024 
X      Chief Social Work
Officer
Communities
Committee
Lanarkshire water safety / drowning prevention strategy
In January 2018, Water Safety Scotland released Scotland’s
Drowning Prevention Strategy which has a key objective to
“develop water safety across Scotland’s 32 local authority
areas and promote the development of water safety policies”.
Within this, there are two key activities: 
• Encourage all local authorities to develop a water safety
policy.
• Support local authorities in the development of a water
safety policy.
In line with these key activities, partners are developing an 
approach to the creation of a Water Safety Policy and will
report on progress to relevant council committees and the
North Lanarkshire Partnership Strategic Leadership Board.
Partnership discussions have commenced to consider the
introduction of a policy which will cover community safety and
management approaches to open waterways in the area.
Partners will include Police Scotland, the Scottish Fire and
Rescue Service, Scottish Canals, and local communities. 
N/A New 1 year plan 
Annual review 
2023 
X      Chief Officer
(Strategic
Communication and
Engagement)
North Lanarkshire
Partnership
Strategic
Leadership Board