Argyll and Bute Council
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle
_________________________________________________________________________ 
Reference No:   20/01345/MFF
Planning Hierarchy:  Local Application
Applicant:   MOWI Scotland Ltd.
Proposal: Formation of fish farm (Atlantic Salmon) incorporating twelve
120m circumference circular cages and siting of feed barge 
Site Address: North Kilbrannan Fish Farm, North of Cour Bay, Kilbrannan
Sound, East Kintyre
________________________________________________________________________
SUPPLEMENTARY REPORT NO. 1
1.0 INTRODUCTION 
The purpose of this report is to make Members aware of additional representations that have
been received since the Report of Handing was published for the May PPSL committee
agenda and to highlight further submissions that have been received from the applicant and
NatureScot.
2.0 REPRESENTATIONS
Richard Prickett, Managing Director of Dorset Cleanerfish Limited was previously a
supporter of the application and has asked for his name to be removed from the application.
Members are advised that additional objections have been received subsequent to the
publication of the Agenda. 
The additional objections are set out below; -
 Ariane Burgess MSP, Highlands and Islands, Scottish Green Party
 Friends of the Sound of Jura c/o John Aitchison by email - objection;
 Jessica Gill, The Old Manse, Skipness, Tarbert PA29 6XT– objection.
 Harry Nickerson, Director, Cour Ltd by email – objection 
 WildFish Scotland c/o Rachel Mulrenan, Director by email – objection 
NB Full transcripts of all representations can be viewed on the Council’s website www.argyll-
bute.gov.uk
A summary of the issues raised is as follows:
Sea Lice and Concerns with Environmental Management Plan (EMP) Approach and Impacts
on Special Area of Conservation (SAC)

Page 2

Argyll and Bute Council should confirm that it is aware that SEPA is proposing to use
essentially the same threshold for harm to wild salmon post-smolts by fish farm-derived sea
lice as the Norwegian state does.
This is significant for the advice that you give the planning committee because MOWI’s
proposed EMP for Kilbrannan Sound includes the company’s modelling of sea lice densities
in the Firth of Clyde.
The EMP’s analysis of this modelling concluded that the densities rarely exceed a threshold
level of harm for wild fish, which it defined as an exposure to 2 copepodid sea lice per
square metre of water surface for 24 hours.
The modelling commissioned by Friends of the Sound of Jura that we have sent you
previously also referred to a threshold of 2 cop lice/m2/24 hours exposure.
In fact this is the Norwegian State’s threshold between a medium and high level of harm.
The lice densities in the sea for that threshold are approximately three times higher than the
threshold exposure level for harm that SEPA has since proposed to use, which is essentially
the same as the Norwegian state’s boundary between low and medium harm, not medium
and high.
This lower threshold is based on the best available science, which has been rigorously
reviewed by the state regulators in Norway.
The Norwegian state uses 0.7 cop/m2/24 hours, an exposure that would result in 10%-30%
of 20g salmon post smolts having enough sea lice on them to kill them. The salmon
population those fish belong to would then face a medium risk of shrinking as a result of
these extra deaths.
SEPA proposes to use the very similar figure of 0.75, based on the same Norwegian
science, and confirmed by a separate analysis by Marine Scotland scientists.
SEPA’s threshold is intended to keep the risk of increased mortality for individual fish below
10%, in order for the risk of the population shrinking to be low (although not zero).
This means that the conclusions in MOWI’s proposed EMP are invalid.
You should reassess the company’s modelling results and ours, in the light of the much
tighter 0.75 copepod lice/m2/24 hours exposure threshold.
Our modelling shows that in alternate years, when all but one farm in the Greater Clyde are
in their second year of production, there is already a significant risk of exceeding the
threshold of harm caused by sea lice from the existing farms, when assessed against 0.75
cop/m2/24hours.
Adding a large new farm will increase this risk.
SEPA’s preliminary modelling of lice from the area’s existing farms shows the same thing -
that in alternate years, a significant percentage of young salmon, migrating along different
routes through the Firth of Clyde, would be exposed to unacceptably harmful levels of lice
(>0.75 cop/m2/24 hours).
Argyll and Bute Council’s LDP Policy AQUA 1 obliges it to consider the cumulative impacts
of this proposed development and that of the existing farms. As you know, cumulative impact
is defined in SPP 2014 as impact in combination with other development. This includes

Page 3

existing development of the kind proposed, those which have permission and valid
applications which have not been determined.
Your statutory advisors Marine Scotland and NatureScot seem to have advised you that this
cumulative risk can be managed through an EMP that would only be able to affect the lice
numbers on three of the 18 farms that would be operating if North Kilbrannan is consented.
Please ask them to tell you how such an EMP will manage the cumulative risk from the other
farms.
Your predecessor Richard Kerr wrote about EMPs to the ECCLR Committee in 2018
(Supplementary written submission from Argyll and Bute to supplementary questions
following ECCLR meeting of 6 February 2018). His comments are still valid.
"By the time we get to the point where an Environmental Management Plan has been
required by condition, the extent to which that is able to address cumulative issues is likely to
be influenced by whether farms in the same water body are in the control of the applicant, or
whether there are multiple operators. It is clearly appropriate to ask an operator of a suite of
farms to address their response to a condition in the light of those farms which they operate
which could reasonably be expected to present cumulative issues, but it is less practical to
ask them to address issues arising from farms in the control of others, where their access to
information will not be the same. 
As a general point about EMP’s, whilst they provide some reassurance that wild fish
interests are being addressed in the context of a particular application, they are not an
appropriate means to provide an area wide response to the overall impact of sea lice. As it is
there are many pre-existing sites operating without EMP’s, and without any prospect of such
unless an application should be made to alter a farm in the future. EMP’s are resorted to by
Planning Authorities given the lack of an overall area based approach to wild fish interests
founded around cumulative impacts. They are only capable of providing a somewhat random
and ad hoc response to an issue which is ongoing, regardless of the incidence of planning
applications. Accordingly, we have situations where a loch with no applications holding many
thousands of tonnes of biomass may not be subject to any ongoing consideration of wild fish
interactions, whereas another loch with an application for an extension of a few hundred
tonnes may prompt the requirement for an EMP and the potential need to address
cumulation with other sites. They are in effect a sticking plaster, not a systematic means of
assuring well-being in the wider environment.
Please note that the Planning Authorities responsible for aquaculture are agreed that EMP
conditions afford the only means open to them to monitor the effectiveness of an operator’s
response to the incidence of sea lice arising from the operation of a particular site, and
present the only opportunity to require monitoring data or to introduce sanctions in the event
that lice numbers after mitigation become significantly more prevalent than envisaged at the
application stage. That does not, however, mean that EMP’s are the best means of
monitoring the impact of sea lice from multiple sources upon a given water body. That would
be best addressed routinely on an area wide basis (by Marine Scotland with input from SNH
and the DSFB’s?) taking into account all existing development, and operating experience
gained from that development, without having to wait for a random catalyst presented by a
planning application. The haphazard response to date via a small number of EMP’s would
suggest that responsibility for wild fish interactions has been inappropriately allocated to
Planning Authorities, who given their reactive role, are not in my opinion the best placed
regulator to address this issue on a comprehensive basis, taking into account cumulative
effects.”

Page 4

WildFish Scotland challenge the assertions made in an email from NatureScot to the
Planning Authority which concludes “we are satisfied the LPA can conclude that appropriate
measures are in place to ensure that the farm will not compromise the conservation
objectives of the Endrick Water SAC and will not therefore result in an adverse effect on site
integrity.”  We are adamant that this assurance is flawed for the following reasons (inter alia):  
1) Neither NatureScot’s latest advice, nor the EMP, take any account of the cumulative
impact of a large additional farm in this section of the Firth of Clyde and associated sea
lochs, when it is combined with all the existing farms. The North Kilbrannan site is close to
the mouth of Loch Fyne where there are up to ten active salmon farms at any one time
operated by another company (Bakkafrost), which is not a party to the EMP. North
Kilbrannan, if approved, would likely add to lice loads being produced in and washed out of
Loch Fyne as well as lice emanating from all the other farms, such as Ardyne, in the Firth of
Clyde area. In the event that monitoring shows elevated lice levels on wild salmonids, then
Mowi may well dispute that its North Kilbrannan (and Carradale) farms are responsible and
thus refuse to take remedial action; in such circumstances there is no mechanism for
compelling the company to do so. Given the impossibility of determining the source of the
lice causing elevated counts on the wild salmonids, the EMP will be ineffective. To rely on
SEPA’s anticipated and untested sea lice framework at some unknown future date is
contrary to the precautionary principle which the “competent authority” is obliged to pay heed
to. 
Whilst SEPA’s modelling method does enable them to see the percentage of lice contributed
per farm in any sea area (inside its WSPZs) and in principle it would be possible to calculate
the proportion of a fish’s exposure during its journey through the area that was due to each
farm.  However, SEPA does not seem to be proposing this. 
SEPA is deliberately limiting its modelling to only do risk assessment (e.g., by not adding
sea lice biological behaviour to its model), and intends then to ask applicants to do their own,
more detailed modelling. This opens up a gap between SEPA’s approach to consenting new
farms (assessing lice from all farms but in an incomplete way, with the applicants doing the
detail, with implications for potential bias) and the need to do centralised detailed modelling
of areas with multiple farms, regardless of whether new farms are proposed, in order to
protect wild fish. This is especially necessary where there are SACs, due to NatureScot’s
legal obligations. NatureScot has advised colleagues that they have asked SEPA to assess
areas that have salmon SACs first, but that does not mitigate the issue that SEPA does not
plan to improve its modelling, so any risk-screening it does of SAC areas will still have no
detailed modelling, unless the industry volunteers to do it. What is there to stop the industry
doing detailed modelling to rebut SEPA’s less good work in SAC areas?
The written submission from Argyll and Bute to supplementary questions following the
Environment, Climate Change and Land Reform Committee meeting (part of the
Parliamentary Inquiry into salmon farming) of 6 February 2018 noted: “It is clearly
appropriate to ask an operator of a suite of farms to address their response to a condition in
the light of those farms which they operate which could reasonably be expected to present
cumulative issues, but it is less practical to ask them to address issues arising from farms in
the control of others”.
In 2020 NatureScot (then SNH) advised Argyll and Bute Council to take note of their advice
in relation to a scoping opinion for further proposed fish farms in the Clyde region (reference
19/00233/SCRSCO): “…..there are a number of existing fish farms in the Firth of Clyde area

Page 5

which have the potential to result in cumulative impacts. The assessment will need to
consider the potential cumulative risk from multiple new and existing developments to the
SAC and therefore information on any coordinated activity/management should be included.
It will be particularly important that any mitigation that is proposed in any subsequent
planning application/EIA takes potential cumulative impacts into account and is robust and
sufficient to protect the SAC from any adverse effect”.  
2) The proposed EMP (and SEPA’s modelling) relies on Mowi performing and recording
regular weekly sea lice counts. Salmon farms (including those operated by Mowi) routinely
fail to carry out weekly sea lice counts (often for weeks, even months, at a time) for a variety
of reasons including “weather”, “veterinary advice” (during disease and/or lice treatments),
“harvesting” or “withdrawal period” before harvesting. Analysis of sea lice reported data
shows that in 2022, Mowi Scotland failed to submit a sea lice count for 16.8% of its weekly
submissions. On some farms, "no count" accounted for over a third (An Camas - 34.6%) of
all weekly counts given in 2022. There is no mechanism for forcing companies to carry out
lice counts. The absence of lice counts will render the EMP inoperative.
Argyll and Bute and NatureScot may argue that the EMP does not solely depend on sea lice
counts on farms as it also depends on feeding back sea lice counts on wild sea trout and
‘monitoring’ the Endrick Water SAC’s and other salmon populations in freshwater. It is
extremely hard to catch enough sea trout to get statistically valid sea lice counts – hence no
EMPs in Scotland have thus far affected farm management – and there is no mechanism in
the EMP to allow monitoring of the SAC’s salmon population to feed back into farm
management. 
Critically the Endrick Water SAC’s population is already falling. NatureScot has no way of
knowing what proportion of that fall is due to each of the existing farms, so how much of any
future fall will be due to North Kilbrannan? As emphasised above, the companies will
challenge any conclusions drawn about this, during the end of cycle review. 
Only modelling can allocate the degree of blame and the need to take action to each farm,
but SEPA is planning to use modelling methods that the industry could refute, because they
do not include sea lice behaviour. In addition, any assessment against SEPA’s threshold of
harm relies on the sea lice dispersion modelling being able to accurately predict the actual
lice density in the sea. 
None of the Scottish models have been validated, including SEPA’s, so the absolute lice
figures they predict can also be challenged by industry. NatureScot seems to have no
expertise and little knowledge of how sea lice modelling works or its limitations.  
3) NatureScot envisages the North Kilbrannan farm’s management of sea lice being subject
in due course to the “the detailed modelling and risk assessment process required under
SEPA’s framework”. As noted above, SEPA has said specifically that it will not do detailed
modelling, only enough for risk screening.
Additionally, when SEPA’s sea lice framework (the details of which are still being consulted
on) comes into force (perhaps in 2024 at the earliest) it will initially only be for new farms or
farm expansions. The framework will only incorporate existing farms at some undetermined
future date. If granted planning permission, North Kilbrannan will then by 2024 be an existing
farm and accordingly not (until some undetermined future date) subject to the SEPA sea lice

Page 6

framework regime. This will occur only when evidence of harm is presented to SEPA, which
really means supplying SEPA with more detailed modelling than its own, for the reasons
given above. The industry will not go out of its way to do this unless it is confident it can
show that there is no risk of harm.
4) Councils (including Argyll and Bute) readily concede that they do not have the resources
or the knowledge to enforce the terms of an EMP. The written submission from Argyll and
Bute to supplementary questions following the Environment, Climate Change and Land
Reform Committee meeting (part of the Parliamentary Inquiry into salmon farming) of 6
February 2018 acknowledged that EMPs are “somewhat random and ad hoc response to an
issue which is ongoing” and “are in effect a sticking plaster, not a systematic means of
assuring well-being in the wider environment”.
The EMP provides no reassurance, let alone certainty, that the integrity of the Endrick Water
SAC will not be compromised by the proposed North Kilbrannan farm. NatureScot’s position
is untenable because it is endorsing a regime under which only three farms are party to the
EMP and there is no mechanism whatsoever for feedback from the monitoring of impacts on
the SAC to farm management.
Given the uncertainties and the clear risk to wild fish, especially in the SAC with its high
threshold of ‘beyond reasonable doubt’, NatureScot and Argyll and Bute should be applying
the precautionary principle, rather than hoping to fix matters through limited adaptive
management. Consequently, NatureScot’s advice does not stand up to scrutiny and
accordingly it would be wrong for Argyll and Bute, as the competent authority, to rely on this
advice. In the circumstances we maintain that it would be illegal for Argyll and Bute to
approve the North Kilbrannan planning application.
SEPA has trialled that risk-assessment modelling by modelling post-smolts (young salmon)
that swim through Loch Fyne and the Firth of Clyde – including the area where Mowi’s new
fishfarm is proposed at North Kilbrannan - to reach the sea. Salmon migrating out of the
Endrick Water Special Area of Conservation – salmon that are supposed to be protected –
also swim through that area in the Firth of Clyde.
SEPA’s modelling did not include sea lice from the proposed North Kilbrannan farm. But it
found that, from the existing 17 salmon farms in the Greater Clyde area - between 10 and
30% of migrating salmon would be at risk of death due to sea lice, and 15% of the smolt’s
journeys would expose the young salmon to levels of harm above SEPA’s accepted
threshold.
The Endrick Water salmon are already in decline. Allowing more finfish farms will expose the
wild salmon to even more sea lice and even greater pressure on their populations.
Comment: This application is supported by an EMP which the Council has been advised by
its statutory consultees is fit for purpose.  It is accepted that in the future the sea lice issue
will be more appropriately regulated by SEPA, however, there is no moratorium on marine
fin fish applications until the SEPA system is in place, therefore, under the current system an
EMP is considered an acceptable way to manage this issue.  It should be noted that the
EMP contains a requirement for adaptive management and in this respect the applicant has
advised that they propose to revise the EMP and include a commitment that the outputs of
the modelling and risk assessment process generated under the proposed sea lice risk
framework will feed into and influence the first end of cycle review process.
Fish Farm Medications and Impacts on Human Health

Page 7

You mention that ‘Expert opinions have been submitted critiquing the conclusions of the
SSPO (now Salmon Scotland) commissioned report on the impacts of fish farm medications
on human health. These are from Professor Malcom Hooper, Emeritus Professor of
Medicinal Chemistry and Mr Boetimann Isaack, Principal Advisor, Fish River Occupational
Hygiene.’ We consider it a critical omission that you have not made clear that both experts
went beyond a critique and unequivocally stated that the chemical emissions from the fish
farm present a risk to public health and safety. It is also a critical omission that you have not
mentioned the corroboration of the third expert, Professor Galloway, nor the fact that she
was an officially recognised expert member of the UK Government Hazardous Substances
Advisory Committee. Decision makers need to know that three totally independent,
unconnected and highly qualified experts have concluded that the salmon farm chemicals
present a risk to human health and no Government expert has provided any counter-
evidence. In spite of this, your recommendation relies on just one Industry sponsored report
and the meaningless response of NHS Highland who have declared that they are not
qualified to help you decide. The onus must be on the applicant and the Council to confirm
that this application will not endanger the public. The balance of evidence (three to one)
suggests that it will endanger the public, that no one has calculated how far the risk extends
and that there is no legal method of excluding the public from this zone, but your report does
not make Councillors aware of this.
You do not mention that there is physical effluent emitted by salmon farms, consisting of pink
slime, froth and greasy scum which we have proved will flow into and stagnate within Cour
Bay where people swim. We have submitted photographic evidence of this pollution and if
you were to look on the Google Map Satellite view of Carradale fish farm right now, you will
see evidence of large quantities of visible pollution flowing out of that site. This pollution
impacts on the amenity of others in contravention of your bad neighbour policies LDP 8 and
SG LDP BAD1 and we question why you are not briefing Councillors about it.
Comment:  The planning authority does not have expertise in human health and therefore
NHS Highland were consulted on this planning application.  Whilst NHS Highland did not
give definitive advice on the applicant’s supporting report or the reports submitted by a third
party, they did not object to the proposal. In order to further reduce risk associated with this
proposal, a planning condition is recommended which will require the applicant to advise
interested parties when they are conducting bath treatments on the farm.
Site History
You state that ‘There have been not previous planning application at this site for a fin fish
farm at this location. A Crown Estate licence was consulted in 2006 but this was withdrawn.’
This statement is not true. It is true that prior to March 2007, fish farm planning applications
were handled by the Crown Estate rather than the Council, but multiple applications were
made from 1989 onwards and are a matter of public record. By denying their existence,
Councillors are being mis-led, because relevant authorities have already considered and
rejected this site for sound reasons. The previous applications include: 
a. 17 February 1989 - Crown Estate Notification of Application for Proposed Marine
Fish Farms Sites – 707a Cour, East Kintyre NR831484 – Salmon and Cod.
b. 12 June 1989 - Crown Estate  Ref  XX100/719a Which approved a shell fish farm at
Eascairt while rejecting other sites that initially included one at Cour. Also
XX100/720a and XX 100/778a.

Page 8

c. 1 September 2004 - 04/01749/MFF Application to Argyll and Bute Council Fish
Farms At Rubha Riabhach. (Rubha Riabhach is at Cour). This was from Lakeland
Marine who wanted to farm Cod and this company was absorbed into Marine Harvest
(now MOWI).
d. 27 April 2006 - Crown Estate Ref XX100/118b by Lakeland Marine for Salmon Farms
at NR839495 and NR858535 (which are beside Cour).
e. 25 April 2006 – 06/00873/MFF Application to Argyll and Bute Council for Marine Fish
Farm at Rubha Riabhach. The Council Planning Portal shows that this application
was only formally closed in 2012. 
The Eilean Grianain (Carradale) site was consented in 2009 when Council officials
reassured us that no further applications would be permitted further up the Kintyre Coast and
there was recognition that sites such as Rubha Riabhach were not suitable.  The current
application for North Kilbrannan (Rubha Riabhach) commenced with SEPA in 2018. The fact
that no approval has been granted previously at Cour or Rubha Riabhach after so many
years of consideration between 1989 and now is highly significant, but your report ignores
this.
Comment:  Marine Fish Farms have only required planning permission since 2009, however,
previously planning authorities would have been consultee in the process.  The site history
listed on the Report of Handling is that which is available on the Council’s electronic planning
application software. When a planning application is submitted to the Council it is assessed
on its merits against the policies of the Development Plan.
Impacts on Listed Building
You state at page 50 that the fish farm is ‘outwith sightlines of adjacent Crossaig and Cour.’
This is factually incorrect, which can be proved by a site visit, and the entire fish farm will be
visible from Cour House. A similarly incorrect statement about  the headland of Rubha
Riabhach screening the site from Cour House fails to take account of the elevation of Cour
House which means that you can see over the top of the headland, leaving the whole fish
farm in full view.
Comment: Officers’ view on the impact of this proposal on the setting on the category A
listed building has been formed through the consideration of the SLVIA submitted as part of
the EIAR and a consultation response for Historic Environment Scotland who have not
objected to this proposal.
General Concerns Regarding Fish Farms
When you read that MOWI were nominated for the Scottish Polluter of the Year award in
2019, it is very concerning an irresponsible to give them permission to open another farm. 
Salmon that industrially farmed in open net cages are crammed at incredible densities,
which not only causes the fish a great deal of stress but also abets the spread of deadly sea
and polluting local waters.  Mortality rates on farms can be as high a 57%, high levels of sea
lice infestations spread to wild populations, and pollutants used to control the infestations
devastate the sea bed ecosystems.  Allegedly between April and December 2019, MOWI
Scotland applied 19.6 tonnes of formaldehyde used as a pesticide, into Scottish Lochs. 
Formaldehyde is classified as a human carcinogen and SEPA says that uncontrolled
releases “have potential to cause significant harm to the environment”.

Page 9

You have not briefed Councillors on MOWI’s poor record of fish farm structural failures and
escapes. Allegedly, the new standard of fish farm design will withstand all storms, but
critically you have not told Councillors that the design standards are based on a storm of 70
mph winds occurring only once in every 50 years. This area encounters stronger winds than
that nearly every year, so the build standard is inadequate. Carradale fish farm
catastrophically collapsed in 2020 allowing fish to escape and North Kilbrannan is much
more exposed so the risk there is even higher, but Councillors are not being briefed about
the facts nor the consequential legal risk.
Comment: Pollution issues are a matter for SEPA.  With regard to the risk of escapes, the
applicant has provided attestations for the proposed equipment and have introduced new
more stringent procedures since the Carradale escape.  These are considered to be
acceptable. 
3.0 FURTHER COMMENT FROM NATURE SCOT
In response to late representations received in relation to cumulative impact and Endrick
Water SAC, NatureScot submitted a further response to the planning authority dated
23/5/23. NatureScot have stated that 
“We note that the issue of cumulative impacts has been raised. We agree that the
consideration of possible cumulative effects is important and we would highlight the need for
any regulator to do so as part of the determination process. I would also like to clarify that
NatureScot has further considered cumulative impacts based on new information that has
emerged since our original response to the application submitted in 2020. On the basis of
the information available to us at this time we conclude that the proposed site at North
Kilbrannan is unlikely to contribute significantly to cumulative risk for post-smolts migrating
from the Endrick Water SAC. We have reached this conclusion on the basis of sea lice
dispersal modelling and evidence relating to smolt migration routes in the Firth of Clyde. In
reaching this conclusion we have taken in to account recent smolt tracking studies that
indicate that the primary migration route for smolts from the Endrick Water SAC passes
through the outer Firth of Clyde to the east of Arran. The available sea lice modelling
suggests that this area is less likely to be subject to high density accumulations of sea lice.
On the basis of the available evidence we consider that the risk posed to smolts passing
through this area from the Endrick Water is low. 
From the information that is available to us it appears as though the Inner Clyde area (north
of the Cumbrae Isles) may be a key area in terms of managing cumulative risk for smolts
migrating south from the Endrick Water. A number of proposed new sites exist in this area
and should these sites be consented, they could pose a significant cumulative risk to smolts
migrating from the Endrick Water SAC. However, we acknowledge that these sites are not
currently subject to planning applications and are beyond the consideration of the current
application
Based on the above, we consider that North Kilbrannan fish farm will pose a limited risk to
the majority of smolts migrating south from the Endrick Water SAC and is unlikely to
contribute significantly to cumulative risk. However, we acknowledge that our understanding
of sea lice modelling and migration routes in the Firth of Clyde is likely to continue to
advance in the future. On this basis, we feel that it is important that the LPA maintain a
mechanism to consider any new information that arises, ensuring that they can use the best
available evidence as part of their ongoing consideration of potential risk to the Endrick
Water SAC.”

Page 10

4.0 CORRESPONDENCE FROM THE APPLICANT
Request for In Person Hearing
In a letter dated 18th May 2023 has written to advise that In the event that a pre
determination hearing is confirmed they would request that the format of that meeting
includes the option for an in-person hearing local to the development site. They state that
while they recognise the advantages provided by virtual hearings and their case for having a
permanent role, they believe that full appropriate and balanced participation can be
challenging especially for complex applications. If holding the meeting virtually is preferred
they would ask that the ability to attend in person is available the applicant and other parties.
Comment on Report of Handling
The applicant has noted that in relation to the human health / wild swimming issue, in section
F the report states:
“Expert opinions have been submitted critiquing the conclusions of the SSPO (now Salmon
Scotland) commissioned report on the impacts of fish farm medications on human health.
These are from Professor Malcom Hooper, Emeritus Professor of Medicinal Chemistry and
Mr Boetimann Isaack, Principal Advisor, Fish River Occupational Hygiene.”
The applicant wishes to highlight that they submitted responses from the authors of the
report (wca) which places some doubt on the validity of the expert opinions expressed by the
above individuals. They wish Members to be made aware that wca have responded in detail
to each opinion highlighting some of the comments are not a balanced critique of the
assessment report and whilst raising valid scientific and technical issues there is a lack of
understanding demonstrated of the regulatory risk assessment process. Wca restate their
position that the report does fulfil the fundamental requirements for the risk assessment of
the three substances under their stated conditions of use, based on the criteria and
assumptions clearly stated in the report.
Comment on Further Consultee Reponses and Representations
NatureScot
The applicant agrees that the EMP framework should provide an iterative approach in
respect of use of available and developing evidence and considerations of risk to wild
salmonid populations, including the potential for adverse effects on the integrity of the
Endrick Water SAC.  As such the applicant proposes to revise the EMP and include a
commitment that the outputs of the modelling and risk assessment process generated under
the proposed sea lice risk framework will feed in to and influence the first end of cycle review
process.  The applicant would be content to submit a revised EMP, including such a
commitment, to be approved in writing by the planning authority prior to commencement of
development.  In order to secure this commitment a further condition is proposed as follows: 
“Prior to the commencement of development, a revised Environmental Management
Plan (EMP) shall be submitted which includes a commitment that outputs of the
modelling and risk assessment process generated under the SEPA’s proposed Sea
Lice Risk Framework will feed into and influence the first end of cycle review.
Reason – In the interests of nature conservation.”

Page 11

The applicant would also like to re-state that in terms of using best available science and
evidence to inform the EMP review mechanism they have proactively implemented a 3-year
wild fish monitoring programme in the Endrick Water catchment to develop a comprehensive
pre-development baseline on wild salmon population status.  
Friends of the Sound of Jura (FoSOJ)
After review the applicant considered that there are no new material considerations
presented in this latest response. The applicant acknowledges that the previous modelling
submissions submitted through the application consultation process have been well
discussed, however they would highlight some key points as follows.
• FoSoJ point out the change in the proposed threshold for sea lice modelling;
however, the sea lice risk framework is a proposal currently in development, a process in
which Mowi are collaborating with SEPA.
• There is as yet no standard protocol for modelling sea lice dispersal in Scotland, and
no standard method for presenting the results. Mowi has however used current established
and recognised methods of modelling sea lice dispersal, as used in Norway; these methods
have been demonstrated by scientific peer review to provide predictive capability of infection
pressure risk on wild salmonids. The conclusions of the sea lice modelling carried out by
Mowi, and submitted as an annex to the EMP, remain valid. This modelling which included
an assessment of the proposed development and Mowi’s existing sites at Carradale showed
that lice from farm reared salmon posed a low risk to migrating salmonids.
• An additional modelling assessment was submitted as new information by Mowi
(dated 12 April 2021) which included a cumulative assessment of sea lice risk from all active
fish farms in the Clyde area. The findings showed low lice levels (less than 0.1 lice m-2)
through most of the Firth of Clyde and Kilbrannan Sound.
• Mowi highlighted flaws in the structure and approach of the sea lice modelling
commissioned by FoSoJ. A review by Marine Scotland found that Mowi had reasonable
objections to the FoSoJ modelling.
• Neither Marine Scotland, nor any other consultee, has suggested that the risk to the
wild salmonid population from the proposal is significant, individually or cumulatively.
• The EIA report acknowledges that there are uncertainties in the effects on wild
salmonids from sea lice; however it is also recognised that EMPs presently provide the most
effective means of monitoring and mitigating the potential for adverse interactions between
farm reared salmon and wild salmonids. Mowi has developed its EMP framework on an
area-based principle and the Kilbrannan Sound EMP includes current active Mowi sites at
Carradale. 
5.0 ASSESSMENT
The late objections and submissions do not raise any new material planning considerations
over and above those set out, and fully assessed within the main report.  It is, however,
considered that the addition of a further condition requiring the EMP to take account of the
Sea Lice Risk Framework as offered by the applicant should be included. 
6.0 RECOMMENDATION

Page 12

It is recommended that planning permission be approved subject to a pre-determination
hearing and the revised conditions listed in Appendix 1 of supplementary report no. 1. 
Author of Report: Sandra Davies      Date: 22/5/23
Reviewing Officer: Peter Bain  Date: 23/5/23 
Fergus Murray 
Head of Development and Economic Growth

Page 13

Appendix 1
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 20/01345/MFF 
Standard Time Limit Condition  (as defined by Regulation) 
Additional Conditions  
1. The development shall be implemented in accordance with the details specified on
the application form dated 29/7/20, the Environmental Impact Assessment Report
dated 2020 (and subsequent addendum); and, the approved drawings listed in the
table below unless the prior written approval of the planning authority is obtained for
an amendment to the approved details under Section 64 of the Town and Country
Planning (Scotland) Act 1997 (as amended). 
The developer and subsequent operator(s) shall at all times construct and operate
the development hereby permitted in accordance with the provisions of the
Environmental Statement accompanying the application with mitigation measures
adhered to in full, and shall omit no part of the operations provided for by the
permission except with the prior written approval of the Planning Authority. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan 1 of 12 - 25/8/20
Supplementary
Location Plan
2 of 12 - 25/8/20
Site Coordinates 3 of 12 - 12/8/20
Plans and
Elevations Typical
Pen Design Top
Net Support
4 of 12 - 12/8/20
Feed Barge 5 of 12 - 25/8/20
Underwater
Lighting Technical
Sheet
6 of 12 - 25/8/20
Plans and
Elevations Typical
Net Design
7 of 12 - 12/8/20
Plans and
Elevations Typical
Mooring Design
8 of 12 - 12/8/20
Plans and
Elevations -
9 of 12 - 12/8/20

Page 14

Proposed Site
Configuration
Plans and
Elevations Typical
Pen Design
10 of 12  12/8/20
Admiralty Chart
Extract
11 of 12  25/8/20
Site Plan 12 of 12  25/8/20 
Reason: For the purpose of clarity, to ensure that the development is constructed and
operated in the manner advanced in the Environmental Impact Assessment Report,
upon which the environmental effects of the development have been assessed and
determined to be acceptable. 
2. The development hereby approved shall not be operated other than with a biomass of
2475.54 tonnes or less. 
Reason:  The environmental effects of this proposal have been assessed against this
maximum biomass.  
3. Notwithstanding the details given in the Predator Mitigation Plan, no Acoustic
Deterrent Devices (ADDs) shall be deployed at the site hereby approved. 
Reason:  In the interests of nature conservation.  This planning application has been
determined on the basis that ADDs will not be used. The use of ADDs would be
regarded as a material change to the proposal. 
4. The site shall not be stocked until the wild fish monitoring plan has been agreed which
shall include a requirement to monitor the juvenile salmon population in coastal waters
within a zone of 30km from the Management Area. 
Reason: In the interests of nature conservation. 
5. As part of the end of cycle review, to be undertaken no later than 6 weeks prior to the
end of the growth cycle, the site shall not be restocked until the review has been
agreed by Argyll and Bute Council in consultation with NatureScot. 
Reason:  In the interests of nature conservation.

Page 15

6. There shall be no use of drift nets, vertical static nets or gill nets to recapture escaped
fish. 
Reason: In order to avoid putting marine birds, including guillemots, shags, divers and
others at risk. 
7. The pole mounted top net system hereby approved shall be as noted below unless
otherwise agreed in writing with the planning authority in consultation with NatureScot: 
Height (m)
Perimeter Pole Support Maximum height of 5m above the water
surface 
Mesh Size (mm)
Sidewall netting from the bottom to 2m
height
25
Ceiling net panel and remaining sidewall
netting
100
Colour Dark grey to black 
This shall be subject to review, underpinned by systematic monitoring.  The Planning
Authority shall be immediately notified in the event of emergence of patterns of
entanglement or entrapment of marine birds. 
Reason:  To minimise the risk to all bird species and to ensure that there are no
significant effects on the qualifying interests of the Ailsa Craig Special Protection Area.   
8. The proposal shall be undertaken strictly in accordance with the following criteria:
(a) Operators shall maintain daily records of wildlife entanglement / entrapment
using a standardised proforma which shall be submitted to the planning authority and
copied to NatureScot at 6 monthly intervals or other specified period to be agreed in
writing with the planning authority in consultation with NatureScot. The first proforma
shall be submitted 6 months after the development is brought into use unless
otherwise agreed in writing with the planning authority in consultation with
NatureScot. 
(b) In the event of any significant entrapment or entanglement of gannets, and
any other SPA interests identified as relevant to a particular fish farm (e.g involving
three or more birds of any named species in any one day and / or a total of ten or
more birds in the space of any seven day period and / or repeat incidents involving
one or more birds on four or more consecutive days), the operators shall immediately
notify both the planning authority and NatureScot; 
(c) Adaptive management approaches should be agreed in writing with the
planning authority in consultation with NatureScot in advance of these being
implemented.

Page 16

Reason:  In order to ensure that there are no significant effects on the qualifying
interests of the Ailsa Craig Special Protection Area.  Gannet have an extensive
range and would have the potential to become entangled in nets. 
9. The site shall be operated, monitored and managed in accordance with the
Kilbrannan Sound Environmental Management Plan (EMP) attached to the planning
portal on 22 December 2022 and subsequent approved variation thereof.  The EMP
should be reviewed and updated if required following the adoption by Scottish
Government of any new policy framework relevant to wild salmonid interactions. Any
proposed amendments to the EMP shall be submitted to and approved in writing by
the planning authority prior to the changes being implemented. 
Reason: In the interests of nature conservation. 
10. The site shall be operated in accordance with the North Kilbrannan Sea Lice
Management and Efficacy Report dated 2020 or any subsequent updates of this
document which shall be submitted to and approved in writing by the planning
authority. 
Reason: In the interests of nature conservation. 
11. The site shall be operated in accordance with the North Kilbrannan Containment and
Escapes Contingency Plan dated 2020 and the North Kilbrannan Inspection and
Maintenance Schedule with the exception of any proposed actions contained within
these documents limited by other conditions on this planning permission.  Any
subsequent updates of these documents shall be submitted to and approved in
writing by the planning authority. 
Reason: In order to minimise the risk of escapes in the interests of nature
conservation. 
12. In the event that the development or any associated equipment approved by this
permission ceases to be in operational use for a period exceeding three years, the
equipment shall be wholly removed from the site thereafter, unless otherwise agreed
in writing by the Planning Authority. 
Reason: In the interest of visual amenity and to ensure that redundant development
does not sterilise capacity for future development within the same water body. 
13. The finished surfaces of all equipment above the water surface, excluding the feed
barge, but inclusive of the surface floats and buoys associated with the development
hereby permitted (excluding those required to comply with navigational

Page 17

requirements) shall be non-reflective and finished in a dark recessive colour in
accordance with the details provided in the EIAR unless otherwise agreed in
advance in writing by the planning authority.   
Reason: In the interest of visual amenity. 
14. All lighting above the water surface and not required for safe navigation purposes
should be directed downwards by shielding and be extinguished when not required
for the purpose for which it is installed on the site. 
Reason: In the interest of visual amenity. 
15. Prior to the commencement of development a further Waste Management Plan
shall be submitted to and approved in writing by the planning authority. This shall
include details of the arrangements for the storage, separation, and collection of
waste from the site including proposals for uplift from areas where fish farm
equipment has become detached from the site. 
Reason: To ensure that waste is managed in an acceptable manner. 
16. Prior to the commencement of development, a communications and monitoring plan
in relation to the use of bath medications shall be submitted to and approved in writing
by the Planning Authority.  This shall detail the method by which other marine uses
shall be informed of general safety information that should be considered by water
user when in the vicinity of the farm, including when bath medications are being
actively use at the site.  Thereafter the development shall be carried out wholly in
accordance with the Communications and Monitoring Plan unless otherwise agreed,
or varied, in writing with the Planning Authority. 
The Communications and Monitoring Plan shall include: 
a.  A Communications Plan detailing the method by which other marine users
shall be informed of general safety information that should be considered by water
users when in the vicinity of the fish farm, including when bath medications are being
actively used at the site.  The Communications Plan shall be informed  by the
conclusions of the supporting information “Assessment of Potential Risk to Human
Health Following Use of Azamethiphos, Deltamethrin and Hydrogen Peroxide; WCA;
Dec 2021”,
b. A Monitoring Plan to investigate the dispersal and dilution of Hydrogen
Peroxide following its use in bath treatments on the site and the use of these findings
to review and update the conclusions in the aforementioned supporting information,
and the Communications Plan.  The Monitoring Plan shall include provision for
reporting the findings to the Planning Authority and securing its written approval for
any resultant amendment that may be proposed to the Communications Plan.

Page 18

Reason: In order to inform marine users of potential risks to human health in the
vicinity of the fish farm. 
17. No development shall commence until an appraisal of the wholesomeness and
sufficiency of the intended water supply and system required to serve the
development has been submitted to and approved by the Planning Authority. 
Reason: In the interests of public health and in order to ensure that an adequate water
supply in terms of both wholesomeness and sufficiency can be provided to meet the
requirements of the proposed development and without compromising the interests
of other users. 
18. The Noise Rating Level attributable to the operation of the approved fish farm
operation shall not exceed background noise levels by more than 3dB(A) at any
residential property measured and assessed in accordance with BS4142:2014.   
Reason: In order to protect the amenities of the area from noise nuisance 
19. Prior to the commencement of development, a revised Environmental Management
Plan (EMP) shall be submitted which includes a commitment that outputs of the
modelling and risk assessment process generated under the SEPA’s proposed Sea
Lice Risk Framework will feed into and influence the first end of cycle review.
Reason:  In the interests of nature conservation.