POLICY  AND  STRATEGY  -  16 MARCH 2023 
121
16 March 2023 at 2 pm. 
A Meeting of the POLICY  AND  STRATEGY  COMMITTEE 
PRESENT 
Councillor Logue, Convener; Councillor Kelly, Vice-Convener; Councillor Roarty, Vice-Convener; Councillors
Barclay, Beveridge, Brannan-McVey, Brennan, Campbell, Carragher, Di Mascio, Duffy, Goldie, Jones, Leckie,
Loughran, Masterton, McBride, Nolan, Robinson, Stevenson, A. Stubbs, Sullivan and Watson. 
ALSO  PRESENT 
In accordance with Standing Order 64(A) Councillors Robb and Smith attended as substitutes for Councillors
Hume and Larson respectively. 
CHAIR 
Councillor Logue (Convener) presided. 
IN  ATTENDANCE 
The Chief Executive; Depute Chief Officer; Chief Officer (Health and Social Care); Chief Officer (Finance); Chief
Officer (Legal and Democratic); Chief Officer (Business and Digital); Chief Officer (Strategic Communication and
Engagement); Chief Officer (People Resources); Chief Officer (Education – South); Chief Officer (Place);  Chief
Officer (Community Operations); Chief Officer (Place); Chief Officer (Audit and Risk); Property Manager (Estate
Development) and Democratic Services Manager. 
ALSO  IN  ATTENDANCE 
L. Smith and J. McParland. 
APOLOGIES` 
Councillors Hume and Larson. 
DECLARATIONS  OF  INTEREST  IN  TERMS  OF  THE  ETHICAL  STANDARDS  IN  PUBLIC  LIFE  ETC. 
(SCOTLAND)  ACT  2000 
1. Councillor Watson, by virtue of being the Convener of the Audit and Scrutiny Panel, declared a
connection in respect of agenda item 13 – Risk Management Strategy – and further declared that he
considered the interest sufficiently remote that it did not preclude his participation in consideration of
that matter. 
MINUTE  OF  MEETING  OF  THE  AUDIT  AND  SCRUTINY  PANEL  HELD  ON  24  NOVEMBER  2022 
2. There was submitted a Minute of the meeting of the Audit and Scrutiny Panel held on 24 November
2022.   
Decided: that the Minute of the meeting of the Audit and Scrutiny Panel held on 24 November
2022 be approved.

Page 2

POLICY  AND  STRATEGY  -  16 MARCH 2023 
122
PO12.1(1)  –  STRATEGIC  CAPITAL  INVESTMENT  PROGRAMME  2023/24  TO  2025/26  –  UPDATE   
3. There was submitted a report by the Depute Chief Executive providing an annual update on the
Council’s Strategic Capital Investment Programme including an update on available resources and
expected profile of expenditure over the period (1) highlighting the £709m of Capital Investment plans
from 2021/22 to 2025/26 in support of the Council’s long-term ambitions for place shaping
transformation of towns and communities; (2) providing a narrative on the level of investment in the
Council’s Housing provision through the Housing Revenue Account, with the total investment in North
Lanarkshire’s communities to be £1.332bn over the current five-year planning period; (3) explaining
that the current Strategic Capital Investment Programme demonstrates £159.702m in external
funding; (4) advising that the Council carries out ongoing reviews of the Capital Strategy, with the
current one due for review in 2022/23 and with a revised Strategy intended to be in place for 1 April
2023, however, given the intention to commence work on the development of a new five-year
programme from 1 April 2024, the wider review of the Strategy had been delayed to ensure appropriate
alignment with the Council’s updated Programme of Work, and (5) attaching, as Appendices to the
report, the Strategic Capital Investment Programme updated programme profile and the updated
Terms of Reference and Governance Framework for the Strategic Capital Delivery Group which had
been reviewed to ensure that this group properly reflects the Council’s current organisational structure. 
Decided: 
(1) that the 2023/24 Strategic Capital Investment Programme, as outlined in Appendix 1 to the
report, be approved; 
(2) that the updated profile of the Strategic Capital Investment Programme from 2024/25 to
2025/25, as outlined in Appendix 1 to the report, be approved; 
(3) that the extension of the current Capital Strategy to 31 March 2024, as outlined in the report,
be approved, and 
(4) that the updated Terms of Reference and Governance Framework for the Council’s Strategic
Capital Delivery Group, as outlined in Appendix 2 to the report, be approved. 
PROGRAMME  OF  WORK  FOR  2022/23 
4. There was submitted a report by the Chief Executive (1) advising that, since the Committee had
approved the Council’s first strategic Programme of Work in 2019, an annual review process has
ensured its ongoing currency and relevancy; (2) confirming that, traditionally, annual Programme of
Work updates to the Committee have covered three related aspects namely (a) looking back at what
has been delivered; (b) providing updated results for the 28 Health Check Indicators, and (c) setting
out the Programme of Work for the year ahead; (3) indicating that further work has now been
undertaken during 2022/23 to reframe the Programme of Work in line with the current North
Lanarkshire context presented through the Health Check Indicators and that, following this work, this
year’s approach separates these three aspects into three individual reports on the agenda for this
Committee; (4) considering what has been delivered to date as part of the Programme of Work; (5)
highlighting the key developments that have been achieved in terms of creating the economic, social
and community conditions that would enable local people and communities to thrive, and (6) providing
focus on the investment to date to establish solid foundations that support the place based ambition,
including the provision of high quality housing, hubs at the heart of local communities, transformation
of Town Centres and enhancements to active greenspaces to bring physical and health benefits. 
Decided: 
(1) that the extent of the achievements to date, as set out in the report, which have been delivered
through the Programme of Work to date be recognised, and

Page 3

POLICY  AND  STRATEGY  -  16 MARCH 2023 
123
(2) that it be recognised that the commitment, made in March 2022, to reframe the future
Programme of Work had been fulfilled through the three corresponding reports on the agenda
at this Committee namely what had been delivered, the results of the 28 Health Check
Indicators and the new Programme of Work for 2023 and beyond. 
STRATEGIC PERFORMANCE FRAMEWORK – THE NORTH LANARKSHIRE CONTEXT 
5. There was submitted a report by the Chief Officer (Business and Digital) (1) explaining that The Plan
for North Lanarkshire is supported by a suite of high level Health Check Performance Indicators that
collectively provide the context for North Lanarkshire as a place; (2) intimating that the suite of
indicators has also played an important role in terms of informing the Council’s Strategic Planning
process through the Programme of Work; (3) reporting on a number of data sets which have
demonstrated the positive trend; (4) confirming that, although these positive indicators are welcome,
a number of challenges remain, and (5) attaching, as an Appendix to the report, the latest results and
the North Lanarkshire commentary. 
Decided: 
(1) that the key role that the Health Check Indicators play, in providing the evidence base from
which progress in delivering on The Plan for North Lanarkshire can be regularly assessed, be
noted, and 
(2) that the latest results, as set out in Appendix 1 to the report, and the successes and challenges
summarised in the report, be noted. 
THE  PLAN  FOR  NORTH  LANARKSHIRE  –  PROGRAMME  OF  WORK  TO  2028 
6. There was submitted a report by the Chief Executive (1) reporting that significant and far-reaching
progress has been achieved against the ambition to make North Lanarkshire the place to Live, Learn,
Work, Invest and Visit with these being delivered against the backdrop of high levels of deprivation, a
cost of living crisis and during a global pandemic; (2) explaining that, following a commitment in March
2022 to reframe the future Programme of Work, three linked reports are presented to the Committee
at this meeting with two of these relating to the Programme of Work for 2022/23 and the Strategic
Performance Framework – The North Lanarkshire Context demonstrating the success of the
Programme of Work to date and the evidence base; (3) intimating that clear opportunities remain to
further strengthen an approach that concentrates effort and delivers further unified solutions;
(4) explaining that it is intended to expand the reach of the impact and to ensure that work has the
biggest impact where it is needed most, whilst building evidence that the programmes, projects and
activities implemented were having the desired effect on the lives of all who live in North Lanarkshire -
both now and in the future; (5) providing an initial overview of the creation of the Programme of Work
Development Group and how the original Programme of Work has been enhanced and reframed whilst
remaining flexible and adaptable in the face of future challenges; (6) informing the Committee that the
revised model would better reflect and inform the Council’s financial strategy, which is pivotal in
ensuring that there is strong financial governance and robust, affordable and sustainable financial
plans and which is particularly important in the current financial climate where funding is unlikely to
keep place with inflationary and service demand pressures, and (7) presenting proposed significant
enhancements planned for the new Programme of Work with high-level details for each proposal listed
within the report. 
Thereafter, the Committee received a presentation on the new Programme of Work from L. Smith and
J. McParland. 
Decided: that the Programme of Work, as set out in the report, be approved.

Page 4

POLICY  AND  STRATEGY  -  16 MARCH 2023 
124
STRATEGIC  POLICY  FRAMEWORK  –  ANNUAL  REVIEW  AND  REFRESH 
7. There was submitted a report by the Chief Officer (Business and Digital) (1) explaining that, since
approval of The Plan for North Lanarkshire, and the alignment of the Strategic Policy Framework,
many strategies, policies and plans have been developed, reviewed and updated, approved and
implemented to support achievement of the Council’s long-term vision; (2) explaining that, by providing
a way to ensure a regular monitoring and review process, the Strategic Policy Framework has ensured
that services and activities remain aligned to The Plan for North Lanarkshire as well as the relevant
local and national strategy, policy and legislative context; (3) advising that, due to the significant
change since the Strategic Policy Framework Review Programme was initially created in 2018, the
report to the Committee in March 2022 had represented the outcome of a significant review exercise
undertaken at that time and, therefore, the 2023 annual review had been more light touch, with the
main changes being reflected in the review programme; (4) confirming that maintenance of this
Programme would continue to ensure that each of the strategies, policies and plans within the
Strategic Policy Framework remain up to date or are scheduled to be updated at an appropriate interval
and reported to the relevant Committee for due consideration and approval by Elected Members, and
(5) presenting the refreshed Strategic Policy Framework, attached at Appendix 1 to the report, and
explaining that, within this Appendix, sub-Appendix A provides guidance to support future development
and monitoring processes while sub-Appendix B sets out the accompanying review programme. 
Decided: 
(1) that the role of the Strategic Policy Framework in delivering The Plan for North Lanarkshire,
and in ensuring each of the strategies, policies and plans listed therein remains up to date or
is scheduled to be updated at an appropriate interval and reported to the relevant Committee,
be acknowledged, and 
(2) that the refreshed Strategic Policy Framework, and the accompanying Review Programme,
be approved. 
COST  OF  LIVING  RESPONSE 
8. There was submitted a report by the Chief Officer (Community Operations) providing an update on the
measures that were agreed to be introduced by the Council in November 2022 to assist residents with
the current cost of living crisis (1) providing information on the impact which the cost of living crisis has
had, and is having, on Scottish households; (2) providing detail on the proposed Work Local campaign
which would enhance the options for staff to work from various Council buildings to mitigate against
the impact of higher fuel bills, both in travelling and in heating homes; (3) advising that the purpose of
the “Drop-In Spaces” initiative was to provide accessible locations across the Council area, which
residents could access to assist with the current crisis, with the aim being that they were to provide
spaces for people to attend so that they did not have to heat their own homes at certain periods of the
day, provide a space which allowed social interaction and hot food and drinks, and a point which could
be utilised to provide access to a variety of health and wellbeing supports; (4) providing a narrative on
the Cost of Living Helpline; (5) outlining the communication strategy that was launched in October
2022, together with supporting materials; (6) outlining the next steps to be followed, including the
intention to continue to collect data over the coming months and then to incorporate the findings into
an overall tackling poverty strategy for the Council so as to determine whether there is merit in
continuing all, some or none of the initiatives going forward; (7) clarifying that it is not proposed to
extend the funding for the Drop-In Spaces initiative past 31 March 2023 and that the provision of free
tea and coffee at the 58 Work Local premises would also cease and that, instead, a full review of the
initiatives would be undertaken by the Community Partnership Team on the levels of uptake and
success across all participating organisations, with a further report to then be presented to the
Wellbeing and Tackling Poverty Committee during Cycle 3 2023 containing a recommendation as to
whether funding should be continued and, if so, at what level and to which organisations; (8) clarifying
that, any decision to continue funding will be aligned to the ongoing budgetary considerations for the
Council, and (9) attaching, as Appendices to the report, a list of community groups providing drop-in

Page 5

POLICY  AND  STRATEGY  -  16 MARCH 2023 
125
spaces, the online monitoring form for Community Groups, a user survey for drop-in spaces and a
digital analysis of the cost of living campaign. 
Decided: 
(1) that the continued actions being taken to provide assistance relevant to the current cost of
living crisis be endorsed; 
(2) that a review of the success of the drop-in spaces initiative be undertaken by the Community
Partnership Team following cessation of the current funding on 31 March 2023, and 
(3) that a report be presented to the Wellbeing and Tackling Poverty Committee during Cycle 3
2023 with a recommendation as to whether funding should be continued and, if so, at what
level and to which organisations. 
FACILITIES  TO  SUPPORT  THE  NHS  LANARKSHIRE  VACCINATION  PROGRAMME 
9. There was submitted a report by the Chief Officer (Community Operations) providing details of the
support that could be offered to NHS Lanarkshire in support of its overall vaccination programme up
to and including 31 December 2023. 
Decided: that the proposals as outlined in the report to allow continued support of the
vaccination programme within Lanarkshire be supported. 
OPEN  SPACE  STRATEGY  -  UPDATE 
10. There was submitted a report by the Chief Officer (Place) (1) advising that the Planning (Scotland) Act
2019 introduced new statutory duties on councils to prepare and publish an Open Space Strategy
(OSS) and Play Sufficiency Assessment (PSA) to assess the sufficiency of play opportunities for
children in their area; (2) clarifying that the OSS must contain an audit of existing open space provision
and an assessment of current and future requirements; (3) highlighting that the Act also introduces a
requirement for planning authorities to carry out a Play Sufficiency Assessment; (4) advising that work
is underway on the development of the Council's OSS which will set out a strategic framework for the
future development, maintenance and use of open spaces and agreed networks, and (5) providing an
update on the progress of the OSS and of the steps taken in developing and operating a framework
that will enable the audit to be undertaken. 
Decided: that the approach being taken to develop an Open Space Strategy, including the
arrangements for undertaking the Open Space Audit and Play Sufficiency
Assessment, be endorsed. 
UK  SHARED  PROSPERITY  FUND  -  UPDATE 
11. There was submitted a report by the Chief Officer (Place) providing an update in relation to the North
Lanarkshire Investment Plan for the UK Shared Prosperity Fund (1) reminding the Committee that, as
previously reported, North Lanarkshire received the conditional allocation of £13,871,047, providing a
mix of capital and revenue funding, for projects which meet the UK Shared Prosperity Fund's (UKSPF)
three investment priorities – communities and place, support for local businesses and people and
skills; (3) detailing that North Lanarkshire's investment priorities, interventions, outputs and outcomes
were submitted as part of the Glasgow City Region (GCR) Investment Plan on 1 September 2022 and
approved by the UK Government on 5 December 2022, with Glasgow City Council, on behalf of the
GCR, signing a Memorandum of Understanding with the UK Government and accepting the Grant
Determination Letters in December, with that Council now in receipt of the first year's (2022/23)

Page 6

POLICY  AND  STRATEGY  -  16 MARCH 2023 
126
allocation of funding, with work being undertaken to develop a pass-down agreement and associated
assurance framework to be signed by the eight member authorities of the GCR, which will be followed
by the distribution of the initial tranche of funding to each authority; (4) highlighting that, to prepare for
the first report to the UK Government during March 2023, officers are reviewing the projected spend
and outputs/outcomes set out in the North Lanarkshire Investment Plan with a view to reprofiling
spend, outputs and outcomes and with no substantive changes to planned activity foreseen at this
stage; (5) indicating that this report would be submitted to the UK Government along with a credible
plan to deliver 2022/23 spend during 2023/24 and, once approved, will release the second year's
funding allocation; (6) informing the Committee that a UK SPF Project Board had been established,
chaired by the Chief Officer (Place) as the Senior Responsible Officer, with the report setting out the
main responsibilities of the Board, and (7) attaching, as Appendices, to the report, copies of various
UK SPF documents. 
Decided: 
(1) that work that is underway to re-profile 2022/23 budget allocations, and the proposal to submit
an updated plan to the UK Government in March 2023, be acknowledged; 
(2) that the proposed governance arrangements and delegated authority requirements as set out
in the report be approved, and 
(3) that the proposal to provide an annual progress report to Committee on the delivery of the
Shared Prosperity Fund be endorsed. 
ABRONHILL  COMMUNITY  HUB 
12. There was submitted a report by the Chief Officer (Assets and Procurement) (1) reminding the
Committee that it had previously agreed, on 1 October 2020, that feasibility works associated with
Abronhill Community Hub could commence; (2) advising that feasibility work for this project is now
complete and it has been determined that it is feasible for a Hub to house two primary schools on a
shared campus, a family learning centre, a health centre and community facilities – at the proposed
site; (3) reflecting on the ongoing volatility within the market, such as inflation pressures, all of which
are placing significant pressure on the Council's capital budget; (4) advising that, due to insufficient
availability of funds at this time, this project cannot be taken forward and that the Hub Programme
Board had reviewed the overall programme and recommended that future work on the Abronhill
Community Hub Project should be deferred to such times as sufficient funding becomes available, and
(5) explaining that the project will be evaluated, as a viable project, during the preparation of the next
five-year capital plan which will be developed during 2023 for commencement on 1 April 2024. 
During consideration of this matter, Councillor Barclay sought a commitment that this project would
not be left behind or forgotten and that a timetable be developed and it, along with any updates on the
project, be communicated to the community on a regular basis.  Thereon, the Property Manager
(Estate Development), on behalf of the Chief Officer (Assets and Procurement), gave such
commitment. 
Decided: 
(1) that the pressures on the Council's Capital Programme and the budget associated with the
Town and Community Hub Programme be recognised; 
(2) that it be acknowledged that the Abronhill Community Hub Project will not be progressed at
this time, and 
(3) that it be recognised that this project will be a key consideration as part of the next Capital
Programme allocations.

Page 7

POLICY  AND  STRATEGY  -  16 MARCH 2023 
127
Prior to consideration of the following item of business, Councillor Watson had declared, by virtue of
being the Convener of the Audit and Scrutiny Panel, a connection and had further declared that he
considered the interest sufficiently remote that it did not preclude his participation in consideration of
this matter. 
PROPOSED  RISK  MANAGEMENT  STRATEGY  2023-2026 
13. There was submitted a report by the Chief Officer (Audit and Risk) seeking approval for a revised and
updated Risk Management Strategy for the period 2023-2026 (1) presenting, as attached at
Appendix 1 to the report, the proposed updated Strategy which was intended to replace the previous
version which had been approved by the Committee in March 2020; (2) indicating that the proposed
changes to the Strategy are, overall, relatively minor and are designed to deliver incremental
improvements to what is assessed as an already sound approach consistent with current risk
management good practice; (3) explaining that the revised Strategy reflects the Council's current
organisational structures and corporate expectations in respect of risk management; (4) confirming
that effective risk management arrangements form an important element of good corporate
governance and are designed to ensure that the Council operates systematic and logical processes
for managing risks within a comprehensive framework, thereby ensuring that identified risks are
managed consistently, effectively, efficiently and coherently across the organisation, and (5) reporting
that the Audit and Scrutiny Panel has regular oversight of the Council's risk management
arrangements and receives regular reports from senior officers on the operation of the Council's risk
management arrangements as well as the management of key corporate risks. 
Decided: 
(1) that the revised Risk Management Strategy, and accompanying guidance, attached at
Appendix 1 to the report, be approved, and 
(2) that the role of the Audit and Scrutiny Panel in providing ongoing Elected Member oversight
of the adequacy and effectiveness of the Council's risk management arrangements be
endorsed. 
GOLDEN  WEDDING  RECEPTION 
14. There was submitted a report by the Chief Officer (Legal and Democratic) (1) providing a background
to the commencements and ongoing holding of Golden Wedding Anniversary celebrations for
residents of both North and South Lanarkshire Council areas since 1997; (2) providing information on
the costs to the Council for holding these events and the impact this has on the overall Civic Functions
budget; (3) proposing that, moving forward, the practice of holding an annual Golden Wedding
Reception cease and that the funds which will and released be made available for other civic
recognition events for individuals, organisations and charities throughout North Lanarkshire, and (4)
confirming that South Lanarkshire Council has been advised of the proposal and that further
discussion would be held with officers of that authority subject to the recommendation being approved
at the Committee. 
Decided: that the cessation of the arrangements for holding an annual Lanarkshire Golden
Wedding Reception, from 2023 onwards, be approved. 
ANNUAL  REVIEW  OF  THE  WHISTLEBLOWING  PROCEDURE 
15. There was submitted a report by the Chief Officer (Legal and Democratic) (1) reminding the Committee
that the Whistleblowing Policy provides a mechanism for employees of the Council and other workers
to report a concern about serious wrong doing within the organisation and to do so with security and
in confidence; (2) reporting that the annual review of the Whistleblowing Policy had been undertaken

Page 8

POLICY  AND  STRATEGY  -  16 MARCH 2023 
128
on its use; (3) confirming that the policy itself had been reviewed and it is proposed that no
amendments are required necessary at this time, and (4) attaching, as an Appendix to the report, the
Council’s Whistleblowing procedure. 
Decided: that the contents of the report be noted. 
WORKFORCE  FOR  THE  FUTURE  –  ACADEMY  MODEL  DEVELOPMENT  PROGRESS  UPDATE 
16. There was submitted a report by the Chief Officer (People Resources) (1) reminding the Committee
that the Council has a well established Workforce for the Future Strategy, which takes forward the
aspirations of The Plan for North Lanarkshire to drive inclusive growth; (2) indicating that, by enabling
businesses to grow and develop their workforce, the strategy provides the basis to create jobs and
meet employment demand and that engaging with key industry sectors as part of the Academy Model
is critical to its future success; (3) providing an update, following a full update on progress with this
work to the Committee in December 2022, on further progress towards developing a Built Environment
Academy and setting out the proposed Terms of Reference for a formal Sector Skills Board, to be
commissioned by the Council for this important industry sector, which includes construction and built
environment, and (4) outlining the progress made towards developing a similar Sector Board for Health
and Social Care and on the steps taken to align the efforts of the Council, South Lanarkshire Council
and NHS Lanarkshire to attract, retain, develop and support a workforce for the future. 
Decided: 
(1) that the progress towards developing a Built Environment Academy, and in particular the
completion of the options appraisal exercise, be acknowledged; 
(2) that the progress towards developing and agreeing a Memorandum of Understanding between
North Lanarkshire Council, South Lanarkshire Council and NHS Lanarkshire for the Health
and Social Care sector be acknowledged; 
(3) that the commissioning of a Built Environment Sector Board, as detailed within the report, be
approved, and 
(4) that the implementation of a Health and Social Care Sector Board be progressed. 
OUR  FUTURE  WORKPLACE  –  EXTENSION  TO  THE  HYBRID  WORKING  SCHEME 
17. There was submitted a report by the Chief Officer (People Resources) (1) reminding the Committee
that the Council has a clear ambition to create a more agile and collaborative workplace environment
to enable employees to work digitally, flexibly and in locations which are closer to, and within,
communities; (2) highlighting that over the previous two years, and accelerated by the requirements
of the pandemic, the Council has been on a journey to develop flexible work spaces and technology
that have brought several significant benefits to staff and services; (3) confirming that, following
approval by the Committee at its meeting in December 2021, the Council implemented its first Hybrid
Working Scheme for an initial period of 12 months, effective from 1 April 2022, that the implementation
of this Scheme was based on significant manager, staff and trade union consultation, and that there
has been a continuation of staff engagement during the operation of the scheme, and (4) reporting
that the first 12 months of the Scheme will expire in March 2023 and seeking approval for the proposed
next steps for the Hybrid Working Scheme as the Council responds to the challenges and opportunities
presented over the next few years.

Page 9

POLICY  AND  STRATEGY  -  16 MARCH 2023 
129
Decided: 
(1) that the extension of the Hybrid Working Scheme for a further 12 months to 31 March 2024
be approved, and 
(2) that the commitment to explore opportunities for a permanent scheme during this time, to
provide increased flexibility for hybrid staff whilst ensuring performance, productivity and staff
wellbeing are maintained, be noted. 
LEADERSHIP  AND  OPERATING  MODEL 
18. There was submitted a report by the Chief Officer (Education South) (1) reminding the Committee of
approvals it provided in December 2021 to take a three-phased approach to the Leadership and
Operating Model over a ten year period which, pragmatically, provides a period of transition as the
new Town and Community Hub Infrastructure is established as part of the Council’s place based plans,
with hubs fundamentally providing the networks and services that meet the needs of people from
across communities and to support improved outcomes; (2) outlining delivery during phase 1 and
setting out a two-year plan for phase 2 as an integrated provision that depends on strategic alignment
between projects and programmes delivering against The Plan for North Lanarkshire; (3) highlighting
the importance of an iterative phased and structured approach to engaging and involving partners,
stakeholders and the community and voluntary sector with the new ways of working together, which
are required; (4) confirming that, with the economic and financial challenges ahead, it is important that
the Council learns and gains confidence as to what works with communities, ensuring that it develops
a hub provision that better meets their needs, and will have a greater impact on outcomes, due to the
involvement of individuals who will access them; (5) seeking approval of the two-year plan in order to
grasp the challenges and opportunities ahead to take North Lanarkshire towards its longer term
operating model; (6) detailing the proposed next steps, and (7) attaching, as Appendices to the report,
a series of documents providing further information and guidance on the project and model including,
at Appendix 7 to the report, a graphical representation of the activity audit of community use of
facilities. 
Decided: 
(1) that the integrated provision approach taken to the two-year plan, given the dependencies
across different areas of work and the requirement to work effectively across teams to align
and deliver these efficiently within agreed budget parameters, be approved, and 
(2) that the activity analysis work, as detailed in Appendix 7 to the report, that has been completed
across all nine Community Board areas to form a baseline understanding of current activity
across Council assets to help future planning in line with ambition statements 24 and 25, and
to support the progression of this work in phase 2 to include community and voluntary
organisations to provide a fuller picture across North Lanarkshire, be noted. 
CONTRACT  AWARD  FOR  POSTAL  SERVICES 
19. There was submitted a report by the Chief Officer (Strategic Communication and Engagement)
(1) explaining that the Council requires provision of a variety of mail services on an ongoing basis in
order to meet its statutory obligations across a range of service areas and that mail services require
to be continuously available to the Council with no delay or break, and (2) seeking approval of the
award of a call off contract for the provision of postal services to Royal Mail Group Limited for the
period 1 July to 31 December 2023 with an estimated contract value of £450,000 exclusive of VAT. 
Decided: that the award of the contract to Royal Mail Group Limited for six months, with a
contract value of £450,000, exclusive of VAT, be approved.

Page 10

POLICY  AND  STRATEGY  -  16 MARCH 2023 
130
It was agreed in terms of Section 50A(4) of the Local Government (Scotland) Act 1973, that the public
be excluded from the meeting for the following items on the grounds that the business involved the
likely disclosure of exempt information as defined in paragraphs 8 and 9 of Part 1 of Schedule 7A of
the Act. 
THE  CENTRE,  CUMBERNAULD 
20. There was submitted a report by the Chief Officer (Place) providing an update to the Committee on
progress with the planned acquisition and re-development of The Centre, Cumbernauld and seeking
endorsement of the acquisition of The Centre at the previously agreed purchase price. 
Decided: 
(1) that the progress that is being made in taking forward previously approved proposals for the
acquisition of The Centre, Cumbernauld, as outlined in the report, be acknowledged, and 
(2) that the purchase of The Centre, Cumbernauld, subject to conclusion of any final due
diligence, at the previously approved purchase price, as set out in the report, be approved.