North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref  EK/KS/VR Date 29/09/22 
PoW 11; 5 Year Medium Term Financial Plan 2023/24 to 2027/28 
From  Elaine Kemp, Head of Financial Solutions  
E-mail kempe@northlan.gov.uk Telephone  01698 302408 
Executive Summary
This report provides an update on the five year financial forecast and outlines the
challenges faced by the Council in maintaining medium term financial stability, whilst
achieving the strategic priorities of the Council. 
Taking the 2022/23 budget as the new baseline, this plan updates financial planning
assumptions in relation to future revenue grant and other funding sources, along with
increased cost pressures arising from employee costs, inflation and policy decisions.  A
range of risk-based scenarios have been considered, resulting in envisaged, pessimistic
and optimistic positions, as set out in Appendices 1 to 3.   As in previous years, the level
of local government funding and potential pay awards remain two of the main variables
which have the greatest scope to impact financial plans and the Council’s ability to set a
balanced budget. However, this financial plan also recognises the more recent adverse
impact and the volatility of inflation and rising energy costs.  Whilst the envisaged scenario
remains the most appropriate for planning purposes, it is important to note the budget gap
range, reflecting other potential scenarios the Council may face.  Table 1 below includes
the optimistic and pessimistic scenarios and demonstrates the volatility and the extent of
the fluctuation possible over the period of this plan.     
Table 1 below summarises the Council’s forecast financial position, with the envisaged
scenario indicating a budget gap of £108.947 million over the five year planning period and
£74.817 million for the three year budget period, 2023/24 to 2025/26.  Reflecting the other
planning scenarios, the budget gap is estimated to range between £58.703 million and
£226.534 million over the five year period, and £43.624 million and £145.944 million over
three years.

Page 2

1. Background  
1.1. Longer term planning is integral to the Council’s Financial Strategy and the strategic
approach to budgeting.  Effective decision making relies on robust financial planning
and the Medium Term Financial Plan (MTFP) assists in ensuring resources are aligned
to the key priorities outlined in The Plan for North Lanarkshire and that the Programme
of Work is affordable and sustainable.  Elected Members require robust information to
support decision making to ensure medium term financial sustainability for the Council.
The MTFP reflects the financial risks that may impact on the Council’s ability to continue
to provide high quality services focussing on the strategic priorities, whilst balancing
the budget.   
1.2. This plan continues to consider a range of scenarios and highlights the associated
forecast budget position.  Taking the 2022/23 position as the new baseline, updates to
financial planning assumptions in relation to future revenue grant and other funding
sources, along with increased cost pressures arising from employee costs, inflation and
other commitments, are reflected in this plan.  A range of risk-based outcomes are   
In line with the principles of the Revenue Resources Budget Strategy, the Council will work
towards finding solutions to address the potential budget gap and ensure its statutory
obligation to set balanced budgets are met.
Recommendations
It is recommended that Policy Strategy Committee: 
(1) Acknowledges the updated Medium Term Financial Plan 2023/24 to 2027/28.
(2) Acknowledges that this plan will be subject to ongoing review with changes reported
through future Financial Outlook reports. 
(3) Recognises, as per paragraph 5.5, engagement with elected members is required to
ensure options to address the budget gap in each financial year are identified, to
enable the Council to set a balanced budget.  A series of budget briefing sessions
will be arranged as required between October 2022 and January 2023 to progress
this work.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Financial Year Budget Gap
Optimistic
(£000)
Budget Gap
Envisaged
(£000)
Budget Gap
Pessimistic
(£000)
2023/24 24,613 37,897 63,844
2024/25 12,170 20,620 44,260
2025/26 6,840 16,300 37,840
2026/27 7,430 16,880 39,610
2027/28 7,650 17,250 40,980
TOTAL 58,703 108,947 226,534
3 Year Gap 43,624 74,817 145,944
Table 1
General Fund

Page 3

modelled highlighting optimistic, envisaged and pessimistic scenarios.  In the past, the
two main variables which have the greatest potential to impact financial plans and the
Council’s ability to set a balanced budget have been the level of funding provided by
the Scottish Government and pay inflation.  However, with more recent potential
material adverse impacts of non-pay inflation and rising energy costs, this plan
recognises the risks and volatility of such, and forecasts the potential financial
implications. Therefore, whilst the envisaged scenario remains the most appropriate for
planning purposes, it is important to note the budget gap range, reflecting the other
potential scenarios the Council may face.   The envisaged, pessimistic and optimistic
scenarios are shown in Appendices 1, 2 and 3, respectively, demonstrating the volatility
and the extent of the fluctuation possible over the period of this plan. 
1.3. The Scottish Government published its Resource Spending Review in May 2022, which
set out high level parameters for future Scottish budgets up to 2026/27.  This identified
a flat lining of resource funding for Local Government at 2022/23 levels, over the next
three financial years, with a small increase forecast in 2026/27.  However, it is unclear
if this position comes with additional commitment to new policies or additional
responsibilities.  The Spending Review further confirmed that more detailed spending
plans will be set out in the 2023/24 Scottish Budget and subsequent annual budgets,
meaning that the difficulties in forecasting beyond one year to any degree of certainty
remains.  However, the Spending Review did confirm that the £120.000 million
announced as part of the Stage 1 Budget Bill for 2022/23, originally provided as a one-
off resource, will be baselined and provided on a recurring basis.  The Council’s share
of this was £7.687 million.  This MTFP assumes that the Council has the discretion over
its use on a recurring basis. 
1.4. In addition, the Scottish Government’s commitment to establishing a National Care
Service has resulted in further financial uncertainty in respect of Adult Social Care
services and Local Government as a whole.  Continuing the approach taken in 2022/23,
it has been agreed through collaborative working that financial pressures facing adult
social care services provided to the IJB will be managed by the IJB through use of
reserves or implementation of savings where necessary. Therefore, the Council’s
MTFP continues to exclude any potential future financial impacts of providing Adult
Social Care Services in the overall Council financial planning position.     
1.5 It is considered that a five year medium term plan remains reasonable and appropriate
for financial planning purposes.  
2. Report 
A Strategic Approach to Budgeting
2.1 The Revenue Resources Budget Strategy, approved by Policy and Strategy
Committee, sets out the key principles and framework to facilitate a robust and strategic
approach to financial planning.  The Strategy has been successfully implemented and
embedded in the development of financial plans since 2020/21 and continues to
underpin the budget the financial planning and budget setting process. 
2.2 The previous MTFP indicated a three year gap for the period 2023/24 to 2025/26 of
£66.234 million (2023/24, £20.827 million, 2024/25 £26.777 million and £18.630 million
2024/25).  The planning assumptions have now been reviewed to ensure the plan is
updated for changes in legislative, political, social, economic and demographic factors,
recognising the impact these may have on the demand for services, resources, and
other cost pressures.

Page 4

2.3 Appendices 1 to 3 provide summaries for three planning scenarios across the five year
planning period, highlighting the anticipated budget gap for the three year budget
period 2023/24 to 2025/26.  Whilst three planning scenarios have been presented
reflecting sensitivities & volatility in forecasting, the remainder of this report primarily
focuses on assumptions in relation to the envisaged scenario.  These are contained
within sections 3 and 4 below. 
3. Forecast Resources 
3.1 The largest element of the Scottish Budget is the Scottish Block Grant provided by the
UK Government through the Barnett formula. The UK Spending Review is the process
by which the UK Government sets out its plans for public spending.  This provides vital
information for the Scottish Government’s planning assumptions and budget.  The UK
Autumn Budget and Spending Review 2021 was published in October 2021 and set
out funding for the Scottish Budget at a time when inflation was low and not expected
to rise significantly. The Spring Statement in March 2022 provided an update on the
economy, OBR forecasts and progress since the Autumn budget.  However, despite
the reality of significantly high inflation the UK Government has not, as yet, adjusted
their spending plans.  No date has yet been set for the next spending review however
it is expected to be announced in the Autumn. Therefore, it should be noted that there
is the potential for adjustments to both UK and Scottish Government budgets 
3.2 As outlined above, whilst the Scottish Government’s Resources Spending Review
indicates flat cash settlements for Local Government for 2023/24 to 2025/26, with a
minor increase in 2026/27, there is insufficient detail to give clarity and certainty over
funding at individual Council level and whether this funding will come with additional
spending commitments.  There are also a number of other variables and uncertainties
which may impact on this position including Scottish Government’s commitment to
support priority areas such as health, care, education and children, with the potential
to impact on funding levels for other departments including Local Government. 
Aggregate External Finance (AEF)
3.3 The Council’s revenue funding consists largely of government funding, known as
Aggregate External Finance (AEF), which equates to approximately 82% of the total
funding, and is made up of General Revenue Grant, Specific Grant and Non Domestic
Rates Income, based on the Scottish Government’s assessment of overall spending
needs. 
3.4 As previously noted, estimating future years’ funding with any degree of certainty is
problematic, and a slight variation on funding level can have a significant impact on the
Council’s forecast financial position. Therefore, it is important to be mindful of this when
considering the range of scenarios presented. 
3.5 All three scenarios have been re-baselined to include additional recurring funding
received from Scottish Government of £7.687 million, which was originally allocated on
a one-off basis, as part of the 2022/23 budget setting.  The envisaged scenario
assumes no movement in the re-baselined 2022/23 core grant for the duration of this
plan i.e. flat cash, as indicated in the Scottish Government’s Resource Spending
Review.  Both the optimistic and pessimistic scenarios have been flexed to 1%
increase/decrease respectively.  Therefore, the overall net impact over the 3 year
budget period is a £7.687 million increase in resources for 2023/24. 
Council Tax
3.6 Income from Council Tax accounts for around 17% of the Council’s revenue resources
with the estimated income based on a combination of Band D equivalent value,
householder base and the expected rate of collection.

Page 5

3.7 In setting the 2022/23 budget, the Council decided that Council Tax would be increased
by 3%, increasing a Band D charge to £1,257.89. 
3.8 The Community Investment Programme is funded from ring-fencing future growth in
Council Tax income from regeneration activities and the Council’s ambition, along with
1% of future increases in Council Tax charges. Therefore, this plan reflects the
commitment to increase Council Tax by 1% to support the Community Investment
Programme, which equates to £8.600 million of additional resources over the five year
planning period and £4.900 million over the 3 year budget period.  Any further increases
in Council Tax rates will be a decision for Elected Members to take and will be
considered as part of the solutions in closing forecast budget gaps. 
3.9 Also, in line with the Council’s Programme of Work, a Community Investment Fund
Annual Update is presented as part of this agenda, with the revised forecast reflected
in the approved five year Community Investment Programme. The updated Community
Investment Fund report reflected the economic uncertainties created by the Covid-19
pandemic and continues to be based on pessimistic projections for future Council Tax
ambition growth. This pessimistic scenario has been reflected in the MTFP envisaged
forecast. 
Use of Reserves / Resources
3.10 The Revenue Resources Budget Strategy allows for prudent and controlled use of
balances, with the Change Management Fund supporting the one-off costs of approved
budget savings.  In recent years and in line with its Reserve Policy, the Council has
utilised one-off resources to support multi-year budgeting as well as allowing time to
develop and implement savings over time, or to resource one-off service
enhancements.  There is currently no additional planned use of reserves as a result of
this plan.  However, it was deemed prudent on finalising the 2021/22 annual accounts
to earmark one-off resources to support the anticipated additional financial burden
arising from current challenging economic environment, expected to impact materially
on current budgetary provision in respect of strategic workforce planning costs, non-
pay inflation and energy costs. 
4. Forecast Expenditure Requirements 
Employee Cost Pressures
4.1 Employee costs remain the largest single element of the General Fund budget,
accounting for around 54% of General Fund budgeted expenditure in 2022/23.  Cost
pressures arising from the workforce are therefore material and another key variable
with the potential to impact significantly on the forecast plan.  The forecast employee
cost pressures are outlined below; 
4.1.1 Pay Awards 
A 2.5% uplift was previously assumed for financial year 2022/23.  However, at
the time of writing, the pay offer, which has still to be agreed, is estimated to
cost the Council an additional net 1% or £4.700 million, which has been
reflected in this plan.    It should be noted this position reflects an assumed
share of additional recurring Scottish Government funding of £140.000 million,
estimated to be the equivalent of a 1.5% uplift across Local Government.  The
plan also assumes a share of a further £120.600 million the Scottish
Government has committed to, which will be received as additional capital grant
for 2022/23 and 2023/24.  From 2024/25 onwards, the Scottish Government
has given assurances this funding will be baselined in the revenue grant. 
Discussions are ongoing with Scottish Government to determine the options in

Page 6

applying the additional capital grant to fund revenue commitments.  The Scottish
Government continues to review the potential for additional flexibilities to assist
with funding the remaining burden on councils.  However, to date there has
been no confirmation or agreement in this respect so it remains prudent to
provide for the additional burden of £4.700 million. 
4.1.2 In relation to 2023/24 to 2027/28, an estimated 2.5% increase has been
assumed, to reflect the element of the pay awards expected to be managed
within Council resources, with any uplift above this level assumed to be funded
from additional government support.  The financial implications of this
assumption are £12.000 million, £12.300 million, £12.600 million, £12.900
million, and £13.200 million, across the five years of the plan (on a 22/23
baseline cost which will change subject to the pay uplift agreed).   Therefore, it
should be noted that in the event of an uplift greater than 2.5% and no additional
government support, the envisaged forecast gap could potentially change
materially. 
4.1.3 Pension Costs 
Pension contributions paid by the employer are set by the fund actuary at each
triennial valuation, or at any other time as instructed to do so by the
administering authority.  The Scheme is a multi-employer defined benefit plan
and employers’ contributions are determined so that employee and employer
rates are standard across all participating Local Authorities.  The latest triennial
valuation saw no increase to the employer rate of 19.3%, with the next valuation
due to take place in March 2023, for application from 2024/25.  Previously it was
envisaged that the employer rate could increase as a result of the impact of the
McCloud case, however on the basis that the fund is currently 106% funded this
assumption has been reversed with no change to the employer rate now
anticipated.   
Non Pay Inflationary Pressures
4.2 Historically a non-pay inflationary uplift has generally only been provided where it was
deemed material and contractual in nature, based on forecast relevant inflationary
indices.  This continues to be the case in this update to the MTFP.  However, it is
acknowledged that in the current challenging financial economic environment with
rising inflation and energy costs, it will be even more difficult for services to manage
budgets for which no inflationary uplift is provided.   Non pay inflation will remain under
review with updates provided as necessary through subsequent Financial Outlook
reports.  A more detailed analysis of the impact of inflation is provided separately on
this agenda. 
4.3 To reflect the upward trajectory of inflation, the 2022/23 budget was set with an
additional recurring funding of £2.417 million for contract inflation.  This is currently
being held centrally until there is evidence of the actual inflationary pressure being
experienced by services, which is being monitored throughout the year.  However, as
inflation for 2022/23 was forecast by the Office for Budget Responsibility in March 2022
to be closer to 8%, a further recurring provision of £5.710 million has been built into the
baseline budget, to bring the overall additional provision for contract inflation in 2022/23
to £8.127m.   Whilst this is lower than the current level of year on year inflation being
reported at the time of writing, there is pressure on both UK and Scottish Government
to take action to support such material pressures on public service budgets.  This will
continue to be monitored and any further material changes arising, will be considered
and reflected as appropriate, in future financial outlooks, as we work towards annual
budget setting.

Page 7

4.4 Contract inflationary pressures from 2023/24 onwards have been provided for using
most recent and relevant forecast inflationary indices, totalling £5.890 million in 2023/24
and £17.630 million over the five year period.   
4.5 Due to the real uncertainty around the potential increased inflationary pressures in
relation to energy supplies for 2022/23, a review to determine the likely recurring impact
on fuel budgets is ongoing.   At this stage a further £10.700 million has been provided
for as an additional recurring burden.   
4.6 Other inflationary pressures in respect of energy and non-domestic rates increases
from 2023/24 onwards have also been reflected totalling £1.140 million in 2023/24 and
£4.000 million across the five year panning period.   
Other Cost Pressures 
4.7 Other cost pressures totalling £13.920 million over the five years are also provided for
in this plan.  This predominantly relates to unmanaged burdens within Education,
Children & Families, which are subject to ongoing review.  Also included are anticipated
increased cost of Council Tax Reduction Scheme, other minor cost burdens, including
recurring impacts of COVID-19, and unachievable savings.   
4.8 In addition, although not reflected in this Plan, Committee should note there are other
potential cost pressures of £2.000 million in relation to the delivery of previously
approved Active and Creative Communities savings, which will be the subject of a
future report to this Committee.  
Other Commitments 
4.9 There is provision for loan debt costs in relation to the Community Investment
Programmes, including City Deal, which equate to £2.290 million in year 1 of the plan
and £13.850 million across the planning period. 
5. Updated Medium Term Financial Forecast 
Approved Savings / Advanced Action 
5.1 In line with the Revenue Resources Budget Strategy and the commitment to consider
a three year rolling revenue budget, a three-year savings programme totalling £58.784
million was approved by Council on the 24 February 2020, in relation to 2020/21 to
2022/23.  These savings result in delivery of a minor saving of £0.176 million for
2023/24 in respect of the acceleration of a previously approved saving in relation to the
Reconfiguration of Secondary Schools Management structure, which fell outwith the
original 3 year savings programme to 2022/23.     
5.2 This plan assumes all other previously approved savings will be fully achieved. 
Committee should note that any updates in this regard will be provided to future
meetings and amendments to the Financial Plan will be made accordingly. 
Summary – Medium Term Financial Forecasts
5.3 The table below summarises the envisaged budget gap across the five year period of
the plan and the forecast position in relation to the three year budget period 2023/24 to
2025/26, after accounting for the advance action discussed above;

Page 8

5.4 The envisaged scenario indicates a budget gap of £108.947 million over the five year
planning period and £74.817 million for the three year budget period 2023/24 to
2025/26.  Further details are contained within Appendix 1.  Appendices 2 and 3,
summarising the forecast pessimistic and optimistic scenarios indicating the gap could
range between £58.703 million and £226.534 million, over the five years. 
5.5 In line with the principles of the Revenue Resources Budget Strategy, Council officers
will work with Elected Members to ensure options for potential solutions are presented
to enable the Council to address the budget gap in each financial year and to meet its
legal obligation to set a balanced budget.  As in previous years, budget briefings will
be arranged to support Elected Members in this regard.  This will also be informed by
the results of engagement with Community Boards.  In addition, Committee is asked to
note that the development of a Sales, Fees and Charges policy is underway to support
the principle of achieving full cost of recovery for services provided.   
6. Risks and Uncertainties
6.1 Whilst the assumptions applied to income and expenditure projections in this financial
plan are based on the best information available at the time of writing, they are
inherently uncertain.  The key factors which are likely to impact upon the Council’s
assumptions and future financial plans have been discussed throughout the report,
including the significant uncertainty in relation to the Council’s funding settlement,
volatility in assumed inflationary uplifts including those in relation to pay awards.  There
are also a number of political factors which may impact on planning assumptions,
including the Scottish Government’s commitment to a National Care Service and the
financial consequences of this on Local Government, along with climate change
commitments. 
6.2 Other current notable risks include; 
6.2.1 Ash tree dieback linked to a disease which could cause significant damage to
the UKs ash population.  As has been previously reported to Committee, there
may be a significant financial cost to managing the diseased species, including
identifying ash trees, assessing their condition and where necessary removal
of trees and a programme of replanting.  The Council is in the process of
developing a proposed action plan to manage the position, therefore, it is not
possible to estimate the cost at this stage. 
6.2.2 Committee should also be aware that the Scottish Government is undertaking
a review of Capital Accounting arrangements and statutory mitigations in
respect of such. Statutory interventions override the CIPFA Code of Practice for
Local Authority Accounting, and the Scottish Government has decided to review
them to make sure they remain fit for purpose.  The independent review will
Financial
Year
Budget Gap
Envisaged
(£000)
2023/24 37,897
2024/25 20,620
2025/26 16,300
2026/27 16,880
2027/28 17,250
Total 108,947
3 Year Gap 74,817

Page 9

build upon the work taken forward by Directors of Finance in March 2022 but
will also consider the statutory framework for capital accounting. There is
growing concern among Directors of Finance that the aim is to remove the
statutory mitigations, leaving Councils exposed to the financial consequences
on revenue budgets and ultimately potentially impacting on capital investment
programmes or create volatility which would have implications for Council
taxpayers. Should any such changes be proposed, indications are that these
will be applied going forward with transition arrangements put in place.  The
final proposals are currently scheduled for completion in November 2023, which
should give much needed certainty for local authorities, as we manage the
already significant challenging forecast budget gaps. 
Community Empowerment (Scotland) Act 2015
6.3 This Act requires councils to embed community participation in the design and delivery
of public services, and to build community capacity to give people the skills and
confidence required to be involved, while recognising the particular needs of
communities facing multiple social and economic challenges. In line with previous
financial years the Council will engage in a budget consultation exercise.  The outcome
of the consultation will inform members’ decisions around the solutions to ensure the
Council meets its statutory requirement to set a balanced budget. 
7. Measures of success
7.1 Measures of success will include: 
• Development of solutions aligned to the Council’s strategic objectives outlined in the
Plan for North Lanarkshire
• Setting of a balanced budget for 2023/24 and subsequent years
• Successful and timeous implementation of approved solutions 
8. Supporting documents
Appendix 1 Envisaged Scenario
Appendix 2 Pessimistic Scenario
Appendix 3 Optimistic Scenario 
Elaine Kemp
Head of Financial Solutions

Page 10

9. Impacts ( http://connect/report-template-guidance ) 
9.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☐
9.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
9.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
9.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
9.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
9.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?

Page 11

Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
9.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
9.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
9.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed?

Page 12

Envisaged Scenario Appendix 1
2023/24 2024/25 2025/26 2026/27 2027/28
£000s £000s £000s £000s £000s
Anticipated Cost Pressures 45,870 21,330 16,910 17,590 17,960
Pay Award 12,000 12,300 12,600 12,900 13,200
Pension Costs 0 0 0 0 0
Other Employee Costs; additional recurring impact of
2022/23 pay award
4,700 0 0 0 0
Contract Inflation 11,600 2,650 2,810 3,100 3,180
Energy Costs inc. additional provision for unbudgeted
2022/23 price increases
11,180 360 380 420 390
NDR Costs 660 260 330 360 360
Other Cost Pressures 5,730 5,760 790 810 830
Other Commitments 2,290 2,490 2,790 2,990 3,290
Capital Investment Commitments inc. City Deal 2,290 2,490 2,790 2,990 3,290
Community Investment Fund
Total Cost Pressures 48,160 23,820 19,700 20,580 21,250
Less:
Resource forecasts 10,087 3,200 3,400 3,700 4,000
AEF adjustments - Core 7,687 0 0 0 0
1% Council Tax Increase; CIF 1,600 1,600 1,700 1,800 1,900
Net Council Tax Growth inc. rebaselining adj in year 1 800 1,600 1,700 1,900 2,100
Budget Gap before advanced action 38,073 20,620 16,300 16,880 17,250
Advance Action (176) 0 0 0 0
Approved Savings (176) 0 0 0 0
Revised Budget Gap 37,897 20,620 16,300 16,880 17,250
3 year total (22/23 to 24/25) 74,817

Page 13

Pessimistic Scenario Appendix 2
2023/24 2024/25 2025/26 2026/27 2027/28
£000s £000s £000s £000s £000s
Anticipated Cost Pressures 64,450 37,670 31,400 33,230 34,670
Pay Award 23,900 25,100 26,300 27,700 29,000
Pension Costs 0 3,900 0 0 0
Other Employee Costs; additional recurring impact of
2022/23 pay award
4,700 0 0 0 0
Contract Inflation 12,110 2,990 3,320 3,640 3,750
Energy Costs inc. additional provision for unbudgeted
2022/23 price increases
16,470 450 470 520 500
NDR Costs 900 400 450 490 510
Other Cost Pressures 6,370 4,830 860 880 910
Other Commitments 2,580 2,880 2,980 3,180 3,380
Capital Investment Commitments inc. City Deal 2,580 2,880 2,980 3,180 3,380
Community Investment Fund
Total Cost Pressures 67,030 40,550 34,380 36,410 38,050
Less:
Resource forecasts 3,010 (3,710) (3,460) (3,200) (2,930)
AEF adjustments - Core 610 (7,010) (6,860) (6,800) (6,730)
1% Council Tax Increase; CIF 1,600 1,700 1,700 1,700 1,700
Net Council Tax Growth inc. rebaselining adj in year 1 800 1,600 1,700 1,900 2,100
Budget Gap before advanced action 64,020 44,260 37,840 39,610 40,980
Advance Action (176) 0 0 0 0
Approved Savings (176) 0 0 0 0
Revised Budget Gap 63,844 44,260 37,840 39,610 40,980
3 year total (23/24 to 25/26) 145,944

Page 14

Optimistic Scenario Appendix 3
2023/24 2024/25 2025/26 2026/27 2027/28
£000s £000s £000s £000s £000s
Anticipated Cost Pressures 38,860 19,280 13,840 14,410 14,700
Pay Award 9,600 9,800 10,000 10,200 10,400
Pension Costs 0 0 0 0 0
Other Employee Costs; additional recurring impact of
2022/23 pay award
4,700 0 0 0 0
Contract Inflation 11,030 1,890 2,180 2,430 2,480
Energy Costs inc. additional provision for unbudgeted
2022/23 price increases
5,800 270 270 320 290
NDR Costs 0 0 0 0 0
Other Cost Pressures 7,730 7,320 1,390 1,460 1,530
Other Commitments 3,090 3,390 3,690 4,090 4,390
Capital Investment Commitments inc. City Deal 3,090 3,390 3,690 4,090 4,390
Capital Investment 0 0 0 0 0
Community Investment Fund
Total Cost Pressures 41,950 22,670 17,530 18,500 19,090
Less:
Resource forecasts 17,160 10,500 10,690 11,070 11,440
AEF adjustments - Core 14,760 7,300 7,290 7,370 7,440
Reversal of Use of Reserves/Resources in previous
year
0 0 0 0 0
1% Council Tax Increase; CIF 1,600 1,600 1,700 1,800 1,900
Net Council Tax Growth inc. rebaselining adj in year 1 800 1,600 1,700 1,900 2,100
Budget Gap before advanced action 24,790 12,170 6,840 7,430 7,650
Advance Action (176) 0 0 0 0
Approved Savings (176) 0 0 0 0
Revised Budget Gap 24,614 12,170 6,840 7,430 7,650
3 year total (23/24 to 25/26) 43,624