Democracy Spraffa

Agenda Document Pack - Policy and Strategy Committee - 04/12/2025

North Lanarkshire Council · 4 December 2025
Back to Policy and Strategy Committee — 4 December 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Clerk Name: Mark Hamill
Clerk Telephone: 07811294702
Clerk Email: committee@northlan.gov.ukk
25 November 2025
Members of the
Policy and Strategy Committee
Chief Executive’s Office
Rachel Blair
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk
Notice is given that a Meeting of the Policy and Strategy Committee is to be held in the
Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Thursday, 04
December 2025 at 14:00 PM which you are requested to attend.
The agenda of business is attached.
Rachel Blair
Chief Officer (Legal & Democratic)
Members :
J Logue, T Fisher, L Roarty, C Barclay, A Beveridge, H Brannan-McVey, A Campbell, T
Carragher, C Costello, K Duffy, W Goldie, D Johnston, J Leckie, H Loughran, M McBride, M
McPake, L Nolan, G Robinson, A Smith, A Stubbs, R Sullivan, S Watson, G Woods.
Page 1 of 216

Page 2

Page 2 of 216

Page 3

Agenda
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000
Operational
2 Realising North Lanarkshire as the place to live,
learn, work, invest, and visit
Submit report by the Chief Executive seeking approval
of the service reconfiguration to create a single
communications function for the organisation.
5 - 16
3 One Workforce Annual Update
Submit report by the Chief Officer (People Resources)
providing a comprehensive annual update for 2024/25
on the Council’s progress towards delivery of the
strategic priorities set out within the One Workforce
Plan.
17 - 72
4 Digital Connectivity Masterplan for Council
Housing Tenants Update
Submit report by the Chief Officer (Housing) providing
an update on the long-term integrated plan to provide
digital connectivity for council housing tenants and
seeking approval to undertake a tender exercise to
procure a supplier for the provision of customer
broadband for all council housing tenants.
73 - 82
5 Leadership & Operating Model – phase 2 progress
update
Submit report by the Interim Chief Officer (Strategy and
Engagement) providing an update on the Leadership
and Operating Model and asset rationalisation delivery
plan.
83 - 138
6 North Lanarkshire Half Marathon
Submit report by the Chief Officer (Community
Operations) providing an update on the impact of the
event, lessons learned and sets out a proposal to
extend the event for a further two years with a view to
then assessing the long term future of the event based
on the outcomes from the three previous events.
139 - 148
Page 3 of 216

Page 4

7 School Estate: Strategic Capital Update
Submit report by the Chief Officer (Assets and
Procurement) outlining the progress and associated
commentary for two key areas within the school estate,
both of which are key components of the Strategic
Asset Review and Investment Strategy (SARIS).
149 - 164
Financial
8 Council Tax Strategy Update
Submit report by the Chief Officer (Finance and
Technology) detailing the potential budget scenarios
and the impact on the Council's budget setting in
February 2026.
165 - 182
9 Review of Reserves Policy
Submit report by the Chief Officer (Finance and
Technology) seeking approval of the  revised Reserves
Policy.
183 - 196
10 Community Investment Fund – Annual Update
Submit report by the Chief Officer (Finance and
Technology) setting out annual update on Community
Investment Fund which reflects the Council Tax growth
over the last year.
197 - 206
Contracts
11 Contract Award for Project Manager and Quantity
Surveying Services for Glenboig Community Hub
Submit report by the Chief Officer (Assets and
Procurement) seeking approval to award the contract
for Project Manager and Quantity Surveying Services
for Glenboig Community Hub.
207 - 216
Page 4 of 216

Page 5

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref DM Date 04/12/25 
Realising North Lanarkshire as the place to live, learn, work,
invest, and visit 
From  Des Murray, Chief Executive  
E-mail murraydes@northlan.gov.uk Telephone 01698 302350 
Executive Summary
Since establishing The Plan for North Lanarkshire, regular reports to the Policy and
Strategy Committee have highlighted the successful delivery of numerous programmes,
projects, and activities that are central to transforming North Lanarkshire into a place
people can connect with - a place to live, learn, work, invest, and visit. 
While 57% of the council’s health check indicators show improvement during the delivery
of The Plan for North Lanarkshire, some results remain fragile, and significant challenges
persist.  As the council strives to resource major change aimed at transforming North
Lanarkshire and addressing local economic, social, and health issues, it must do so within
an operating environment that continues to face considerable pressure - including ongoing
financial constraints, rising demand for services, and a complex national policy landscape.   
Among the pressures faced is an ageing population - both within the community and the
council’s workforce - alongside a projected decline in the working-age demographic. In
response, building capability and capacity, maintaining essential skills, and ensuring long-
term workforce sustainability remain vital to delivering The Plan for North Lanarkshire. 
The narrative of The Plan for North Lanarkshire is also vital. Clear messaging that informs
people and communities, engages frontline staff, and strengthens the council’s reputation
is key to fostering the culture and conditions needed for successful transformation that
improves lives. Targeted messaging is also key to supporting economic growth that is
central to The Plan for North Lanarkshire and significant progress is already evident
through large-scale regeneration, including new housing, integrated community hubs, and
town centre renewal. Yet, there remains untapped potential to further elevate North
Lanarkshire and extend promotion of its strategic central location, strong transport links,
and available land to support inward investment and drive sustainable economic growth.   
Since its inception in 2018, the council’s service delivery model has established a strong,
forward-thinking foundation for the one place, one plan, one council approach that
underpins The Plan for North Lanarkshire. Building on this momentum, the vacancy for
Chief Officer (Strategy and Engagement) presents an opportunity to further shape a
resilient, future-ready workforce by fostering deeper alignment and synergies across vision,
plan, governance, and delivery where communication is key to connecting people,
purpose, action, and impact. 
Recent changes at senior management level have opened up a valuable opportunity to
Item 2
Page 5 of 216

Page 6

1. Background 
1.1 Prior to The Plan for North Lanarkshire being formally established in 2019, the shared
ambition for inclusive growth and prosperity for all was set out in a report approved at
the former Policy and Resources Committee in September 2018. This ambition set the
future direction for North Lanarkshire to be a place where everyone is given equality of
opportunity and where individuals are supported, encouraged, and cared for at each
key stage of life.   
1.2 At this time the council’s service delivery model (outlined below) was firmly rooted in
building strong relationships with communities and supporting individuals through each
key stage of life. This approach directly aligned with the priorities of The Plan for North
Lanarkshire and was underpinned by a place-based approach to transform North
Lanarkshire’s physical environment, recognising the intrinsic value and the economic,
social, and health benefits that such transformation brings. 
Service
grouping
Education,
Children, and
Families
Enterprise and
Communities
Adult Health and
Social Care
Chief Executive’s
Services
Priorities in
The Plan for
North
Lanarkshire 
To support all
children to realise
their full potential.
To improve
economic
opportunities and
outcomes.
To improve the
health and care of
communities.
To improve the
council’s resource
base.
To improve relationships with communities and the third sector. 
1.3 The clear direction set out in The Plan for North Lanarkshire, combined with the Policy
and Strategy Committee’s consistent commitment to maintaining the Programme of
Work as the core delivery mechanism, and the longevity of the council’s service delivery
model have together established a solid foundation for the organisation. These
review and realign functions - strengthening the one place, one plan, one council approach
that drives transformation across North Lanarkshire. This renewed focus - set out in this
report - will accelerate the scale and pace of change, helping to position North Lanarkshire
as the place to live, learn, work, invest, and visit. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Approve the service reconfiguration that creates a single Communications function
for the organisation and Senior Strategic Communications Manager therein, realising
recurring annual savings of £47,386 from 2026/27 onwards (as noted in Appendix 1),
and
(2) Note the subsequent realignment of functions within existing remits which are set out
in the paragraphs in section 2.6. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work All Programmes of Work
Page 6 of 216

Page 7

elements have enabled the council to drive meaningful change to improve the lives of
people across North Lanarkshire and enhance the place in which they live. 
1.4 Analysis of the council’s transformation activities shows that 57% of health check
indicators have improved during the delivery of The Plan for North Lanarkshire.
However, some outcomes remain fragile and significant challenges persist. The
environment in which the Programme of Work must be delivered continues to be
complex, unpredictable, and, at times, uncertain. These conditions risk undermining
the substantial progress made toward achieving inclusive growth and prosperity for all
and threaten the creation and sustainability of a fairer North Lanarkshire where benefits
are shared equally and wealth is more evenly distributed across communities. 
1.5 While the council’s service delivery model has provided a resilient foundation for the
one place, one plan, one council approach that underpins The Plan for North
Lanarkshire, it has also enabled the flexibility required to maintain alignment of vision,
plan, and governance, while supporting ongoing refinement and efficiencies in
operations. This adaptability has helped maximise operational efficiencies and
synergies, while ensuring effective co-ordination of resources to strengthen
organisational capabilities and capacity. 
1.6 A consistent and compelling narrative in terms of what the council is working towards
has also played a key role in reinforcing the resilient foundations of the one place, one
plan, one council approach. This narrative is now firmly and consistently embedded
across policy statements and is reflected throughout strategic management, financial
management, strategy development, service delivery, and corporate governance
practices.  Clear and consistent messaging around The Plan for North Lanarkshire has
also been a key factor in maintaining focus and momentum. 
1.7 Operational leadership realignments and efficiencies over the years have been
consistently guided by two core principles to (a) build organisational capacity by
maximising already stretched resources through single council operations, single Chief
Officer portfolios, and single service accountability, and (b) strengthen synergies and
achieve economies of scale and purpose by streamlining back-office functions and
practices in order to enhance the co-ordination and management of resources in
support of, and to deliver, critical frontline care, support, and services. 
1.8 The departure of the Chief Officer (Strategy and Engagement) offers an opportunity to
deliver enhancements and efficiencies that will benefit the organisation. Section 2 of
this report outlines a reconfiguration of service responsibilities and realignment of
functions within the council’s service delivery model which will generate recurring
annual savings of £47,386 from 2026/27 onwards, alongside a range of specific
operational benefits. 
2. North Lanarkshire as the place to live, learn, work, invest, and visit 
2.1  The Strategy and Engagement service (formerly Strategic Communication and
Engagement) plays a strategically important role across the council, encompassing a
broad portfolio of services. Its core functions include shaping and delivering messaging
around The Plan for North Lanarkshire and the Programme of Work, engaging with
local communities, and providing expert advice on all aspects of internal and external
communications - including media and public engagement. In addition, the service
oversees a wide range of corporate activities, including the management of events, the
council’s brand and identity, and its digital presence across web platforms and media
channels. 
Page 7 of 216

Page 8

2.2 Over time, the remit has expanded to include a range of additional functions, as listed
below: 
1. Leadership and operating model - to drive the transformation needed to establish
a centralised approach for delivering integrated care, supports, and services
through community based hubs at the heart of local areas. 
2. Community planning - to support community capacity building, encourage
participation in decision making, and foster the development of local solutions. 
This includes managing community grants, community asset transfers, and the
local development programme to ensure community empowerment is embedded
in service delivery.
3. Strategy and customer experience - to oversee the customer services hub and
business change, co-ordinate strategic community planning for the North
Lanarkshire Community Planning Partnership (nurturing internal and external
relationships), and support the council’s strategic plan, programme of work, and
associated performance and governance frameworks. 
2.3 While the integration of the functions noted in paragraphs 2.1 and 2.2 above have
supported greater operational synergies, the vacancy of Chief Officer (Strategy and
Engagement) presents an opportunity to realign the additional functions within existing
single council operations and Chief Officer portfolios. This would generate greater
efficiencies through single service accountability.  More importantly, it would create
additional capacity within the communications function to proactively plan, design, and
deliver messaging and campaigns in support of The Plan for North Lanarkshire (and in
line with the council’s Communications and Engagement Strategy, approved by the
Policy and Strategy Committee in June 2024). 
2.4 Elevating a single communications structure would create the space to deliver public-
facing and internal communications that foster stronger connections across services,
partners, and communities in delivering the Programme of Work. It would also support
more proactive practices and a unified corporate-service approach that amplifies the
reach and impact of messaging that promotes North Lanarkshire as the place to live,
learn, work, invest, and visit. 
2.5 To this end, Appendix 1 sets out proposals to reconfigure the Chief Officer (Strategy
and Engagement) post to establish a dedicated Communications function led by a
Senior Strategic Communications Manager. Reporting directly to the Chief Executive,
and working with the Corporate Management Team, this role will lead the planning and
delivery of all media and communications activity - ensuring the right messages reach
the right audiences, at the right time, through the most effective channels - in support
of The Plan for North Lanarkshire. 
2.6 This structural refinement will affect the functions noted in paragraph 2.2 above, which
will be realigned within existing remits as noted in the following three sections. 
1. The leadership and operating model will be integrated within the portfolio of the
Chief Officer (Assets and Procurement) to create additional capacity within the
service to deliver the Town and Community Hubs programme in line with the
Strategic Asset Review and Investment Strategy (SARIS), while ensuring earlier
alignment of the operating model therein. 
Key organisational synergies and efficiencies include: 
• Ensuring the delivery and sustainability of an asset base that meets both
current and future needs. This requires a strategic approach to long-term
Page 8 of 216

Page 9

investment in new facilities, while also maintaining short and medium-term
investment to support the existing estate during the transition. Aligning
investment priorities is essential to balance immediate requirements with
future ambitions, support the net zero agenda, and focus resources on the
development of each hub and implementation of its operating model across
the wider estate.
• Improving integration with the asset rationalisation programme through greater
alignment between hub design specifications and operating model
requirements.  This will strengthen early-stage planning and design, helping
to deliver better outcomes for children, communities, and the wider North
Lanarkshire economy in line with the hub principles.
• Ensuring decisions regarding rationalisation, investment, and dis-investment
are enhanced through a fully joined up one council approach that better
connects people and place in delivering essential care, support, and services
that improve outcomes for North Lanarkshire’s communities.
• Promoting stronger connections between physical assets, local communities,
and the needs of the people within them. Each hub - whether newly
constructed or adapted from an existing facility - should reflect the unique
characteristics and requirements of the community it serves. By tailoring both
strategic planning and operational delivery to local contexts, communities will
gain more direct access to the specific care, support, and services they need.
This would also enable staff resources to be deployed more effectively,
working at the heart of communities and closer to the people they support.
• Providing strong and inclusive leadership for shared community hubs that are
welcoming to all users. These hubs should foster a sense of collective
responsibility across local communities, schools, partner organisations, and
the council. This collaborative approach would also strengthen the role of
Elected Members in leading North Lanarkshire’s communities and
representing the best interests of local residents. 
2. Community planning will be incorporated into the portfolio of the Chief Officer
(Housing) to strengthen place-based improvements and promote inclusive and
accessible participation across local communities. Housing tenants, with their deep
understanding of their homes and neighbourhoods, are well placed to contribute
meaningfully to local development. Recognising this, the Chief Officer job title will
be renamed (to Housing and Communities) to reflect its broader remit and
enhanced focus on community engagement. 
Key organisational synergies and efficiencies include: 
• Leveraging legislative requirements related to housing and community
empowerment to strengthen equality, communication, and participation. This
includes ensuring that the delivery of services reflect the voices of tenants and
that local communities are actively involved in shaping and delivering what
matters to them.
• Sharing learning from the Tenant Participation Strategy - a well-established,
two-way engagement model that empowers residents through shared
information, ideas, and responsibilities - to broader community planning and
empowerment efforts. This approach can help improve services and assets
beyond housing. 
• Expanding opportunities for tenant and resident involvement in the nine
Community Boards, enabling them to contribute to longer-term, place-based
decision-making across North Lanarkshire.
• Co-ordinating engagement efforts and resources to ensure inclusive
participation from tenants, residents, underrepresented groups, and seldom-
Page 9 of 216

Page 10

heard voices. This will help identify what matters most to people and build their
capacity to help themselves and take an active role in shaping their
communities.
• Creating an integrated approach to community building that fosters trust,
strengthens local identity, and supports the development of sustainable
communities and resilient individuals - better equipped to withstand broader
economic and environmental challenges.
• Listening to communities through joined-up engagement will not only surface
what matters most to people but also support their ability to act on it,
contributing to the creation of resilient, empowered communities.
• Enhancing collaboration and partnership working with the Community
Planning Partnership and third sector organisations to deliver integrated
services that achieve shared outcomes - such as tackling poverty, growing the
economy, improving safety, and fostering community cohesion - ultimately
benefiting the people of North Lanarkshire. 
3. Strategy and customer experience functions will be integrated within the portfolio
of the Chief Officer (Legal and Democratic) to enhance alignment between the
council’s legal, democratic, and strategy functions. This integration will support a
more cohesive and value-driven approach to governance, enabling legal and
democratic services to contribute more directly to the growth and sustainability of
North Lanarkshire and its communities through the delivery of the Programme of
Work. Recognising this, the Chief Officer job title will be renamed (to Legal,
Democratic, and Strategy) to reflect its wider strategic responsibilities. 
Key organisational synergies and efficiencies include: 
• Centralising responsibility for formal request functions under a single Chief
Officer will raise the profile of the council’s legislative obligations and promote
greater transparency and personal accountability.  This approach will enable
the sharing of best practice across the organisation, streamline processes,
and support more efficient, end-to-end handling of legally based requests,
such as freedom of information requests, environmental information regulation
requests, subject access requests, local authority complaints, and Scottish
Public Services Ombudsman (SPSO) stage three complaints.
• Consolidating customer-facing enquiry functions - including the customer
services hub, registration services, and licensing - under one Chief Officer will
allow for better co-ordination, economies of scale, and the development of
more automated engagement channels. This will help reduce inefficiencies
and drive meaningful business change.
• Integrating business support functions to achieve economies of scale and
purpose in clerical and administrative support for senior officers and elected
members, as well as civic duties. This will help establish a stable and efficient
support model that contributes to organisational success and the delivery of
The Plan for North Lanarkshire.
• Bringing together support and oversight for the North Lanarkshire Community
Planning Partnership Strategic Leadership Board, alongside the council’s
committees, sub-committees, panels, working groups, and related bodies,
under a single Chief Officer will enhance governance and co-ordination. This
consolidation will also strengthen the council’s ability to promote North
Lanarkshire through strategic networks and relationships across economic,
political, and social spheres.
• Centralising responsibility for all non-financial governance arrangements
under one Chief Officer will ensure a cohesive approach to democratic
processes, committee operations, decision making governance, and statutory
Page 10 of 216

Page 11

obligations. This includes governance related to Best Value, performance
standards, and the CIPFA Delivering Good Governance in Local Government
Framework. 
• Assigning responsibility for data governance to a single Chief Officer - who is
also the council’s Senior Information Risk Owner (SIRO) - will ensure robust
arrangements for the safe collection, storage, and use of data. This will also
support data quality and accuracy for evidence-based decision-making,
performance monitoring, and continuous improvement, while also
safeguarding appropriate data sharing.
• Designating the Chief Officer as the Senior Responsible Officer for the One
Service Programme of Work will ensure strategic alignment across the
council’s democratic, decision-making, legal, and governance functions.  This
integrated leadership will provide a strong foundation for the council’s
transformation agenda, thus enabling innovative approaches to change that
drive effective delivery of the Programme of Work. 
Next steps 
2.7 The structural realignments outlined out in this report will strengthen the council’s ability
to maintain a unified one place, one plan, one council approach.  These changes will
support more integrated ways of working by aligning solutions, resources, skills, and
relationships across services, enabling greater efficiency.  Future realignments below
Chief Officer level will be undertaken within the newly aligned service areas in
accordance with the council’s approved Scheme of Delegation. 
3. Measures of success 
3.1 Measures of success include 
• Sustaining organisational capability and capacity essential for delivering the
priorities set out in the Programme of Work and achieving the shared ambition of
inclusive growth and prosperity for all, as outlined in The Plan for North
Lanarkshire.
• Effectively marketing and promoting North Lanarkshire as the place to live, learn,
work, invest, and visit - supporting enhanced economic opportunities, improved
outcomes, and long-term population growth across its communities. 
4. Supporting documentation 
4.1 Appendix 1 -  Workforce changes, with effect from 1st April 2026. 
Appendix 2 -  Senior management team structure, with effect from 1st April 2026. 
Des Murray
Chief Executive 
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Page 11 of 216

Page 12

Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Workforce changes (detailed in Appendix 1) will realise recurring annual savings of
£47,386.  
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Workforce implications are being undertaken explicitly in line with the council’s
Managing Workforce Change Policy.
Formal consultation with stakeholders, including Trade Unions, has commenced.
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Page 12 of 216

Page 13

Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Creating organisational capacity - and ensuring ongoing alignment of vision, plan,
governance, and operations -  is critical to maintain (and sustain) the successful
delivery of the Programme of Work and achievement of The Plan for North
Lanarkshire.  The information presented in this report therefore aims to contribute
towards the mitigation of the risks on the Corporate Risk Register for Governance,
Leadership, and Decision Making and Delivering the Programme of Work.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 13 of 216

Page 14

Appendix 1 
Table 1: Workforce changes (with effect from 1st April 2026) 
Post
Current
establishment
FTE
Adjustment
Future
establishment 
FTE
Salary 
£
On-cost
£
Turnover
£
Total
budgeted
salary 
£
Chief Officer (Strategy and
Engagement) 1.0 Service reconfiguration that
creates a single
Communications function for
the organisation and Senior
Strategic Communications
Manager.
0.0 125,223 36,948 (8,109) 154,063
Senior Strategic
Communications Manager 0.0 1.0 (87,578) (24,714) 5,615 (106,677)
Total 1.0  1.0 37,645 12,234 (2,494) 47,386 
The workforce change in Table 1 will realise recurring annual savings of £47,386. 
Table 2: Summary of workforce changes 
Net change in employee costs Net change in establishment (FTE)
Posts deleted: 
Vacancy 1.0
Posts created: 1.0
Net change: 0.0
Page 14 of 216

Page 15

Appendix 2 
Senior management team structure (with effect from 1st April 2026) 
Page 15 of 216

Page 16

Page 16 of 216

Page 17

One Workforce Annual Update
North Lanarkshire Council
Report 
Does this report require to be approved? ☐ Yes  ☒ No
Ref FW Date 04/12/25 
From Fiona Whittaker, Chief Officer (People Resources) 
E-mail Whittakerf@northlan.gov.uk Telephone 07973 728628 
Executive Summary
This report provides a comprehensive annual update for 2024/25 on the Council’s progress
towards delivery of the strategic priorities set out within the One Workforce Plan, which was
agreed by Policy and Strategy Committee in December 2023. The report highlights some of
the workforce improvements and changes that are being delivered across services through
sustained focus and shows that progress continues to be made in dealing with known
workforce gaps and issues.
Like many local authorities, North Lanarkshire Council continues to face a challenging range
of constraints and historical issues which directly impact on its ability to recruit and maintain
a skilled and motivated workforce. This ongoing challenge was most recently outlined in the
Accounts Commission report Delivering for the future: Responding to the workforce challenge
which was published in August 2025 and reflects an up-to-date position across all local
authorities in Scotland. 
Moreover, over the last 12 months, there is no doubt that the Council has continued to
experience some of the workforce issues which are referenced in the Accounts Commission
report, including the ongoing impact of an aging workforce, rising service demand in areas
such as Health & Social Care, difficulties recruiting skilled professionals, and high levels of
absence in some of our frontline services. When taken together with the need for us to both
transform our operating model and build a digital ready, future skilled workforce, it’s clear that
we must continue to maintain a strong focus on building the workforce capacity and
capability we need to both deliver our services and advance our progress in taking forward
the Programme of Work and our ambitions as set out within The Plan for North Lanarkshire.
Importantly, the council has now fully established an effective approach to workforce planning
that continues to underpin our efforts to proactively tackle our known challenges. This year’s
one workforce update report contains a full summary of our now refreshed and detailed bi-
annual workforce plans for 2025-2027 across all services. These have been led by Chief
Officers using a further refined and improved process; the resultant plans are detailed and
thorough and they will further assist in our efforts to identify and target priority workforce areas
for further investment and development. The strength of our workforce planning approach
was most recently audited and endorsed as part of our Best Value Workforce Innovation Audit
with outcomes reported to Policy and Strategy in 2024.
Policy and Strategy Committee
Item 3
Page 17 of 216

Page 18

Additionally, and to support improved monitoring and oversight of the key workforce metrics
which support our workforce plans and our strategic workforce priorities, the People
Resources Service has developed a draft corporate workforce dashboard, which is included
as an appendix to the report for Elected Member review. We have also included within the
report, the early results from the pilot of both our refreshed employee survey, which has been
built around the principles of fair work, and the final survey of our hybrid working staff to
ensure that our arrangements in this area are working effectively.
These additional sources of strategic workforce information provide a strong foundation for
advancing our objectives aligned to the One Workforce Plan in the coming years. They also
fully support the recommendations within the Council’s own Best Value Workforce Innovation
Audit in 2024, and the priorities set out in the 2025 Accounts Commission report, with local
authorities being encouraged to expand workforce insights, data and reporting and to focus
on strong employee engagement, ensuring that staff are at the core of the council’s
transformation journey. 
Early analysis across this wider suite of workforce data now available for this year’s update
report shows some encouraging workforce trends including that:
• The council is building a younger workforce with a reduction in our overall
average age from 50 to 45.
• Our diversity mix is changing and shows positive recruitment in several core
equalities areas.
• There is clear evidence within detailed service workforce plans that we are
already planning for what will be required in our future workforce and developing
effective solutions for known areas of skills shortage.
• Early indications from our pilot survey show that staff engagement within the
Council is positive across several key indicators.
• 91% of hybrid staff have reported that they are doing 10 or more days in the
office with some reporting that they are doing between 10 and 15 days in the
office.
• 80% of hybrid staff feel that the permanent hybrid scheme supports them well
in their role and responsibilities or has no impact.
• There is further evidence that the council shows a positive working culture within
our people dashboard with relatively low numbers of cases relating to grievance
and disciplinary matters across all services.
Whilst these trends represent clear broad positive indicators and improvements relating to
our workforce, there nevertheless remain many difficult workforce challenges that will have
an ongoing impact on our ability to maintain adequate workforce strength and depth across
our services. These are outlined clearly by services in our recent workforce plans and are
summarised below. Tackling these more complex systemic issues in an effective and lasting
way will require time and sustained action across all services. This is especially true in a
context where we expect further increased service demand; additional staff related savings;
continued challenges with an aging workforce; difficulties with hard to fill posts and high levels
of absence in key frontline services; all of which will result in additional burdens on our existing
staff at all levels. What is clear from our recent workforce plans, is that all Chief Officers are
working hard to mitigate these ongoing risks and operational challenges by continuing to
maintain a strong focus on effective workforce planning, alongside taking all necessary
proactive steps and actions to identify and address solutions to these issues. 
The remainder of this report sets out a full progress update on our One Workforce Plan,
service workforce plans and Strategic Workforce Priorities to 2028. This includes an outline
of several areas where we have made good progress during 2024/25 that are highlighted in
the body of the report against each priority. In addition, within the refreshed One Workforce
Page 18 of 216

Page 19

Delivery Framework, we have included some new areas of corporate work, and these will
further support our continued efforts to build and maintain the council’s workforce to meet
both our ongoing operational requirements and our future strategic aims and ambitions.
Recommendations
It is recommended that Policy and Strategy Committee: 
(1) Acknowledge the continued workforce and associated challenges and risks the
Council is facing.
(2) Acknowledge the continued good progress made against the Council’s One
Workforce Priorities to 2028, our refreshed Service Workforce Plans and the rolling
plan of work which supports the delivery of key actions set out at both corporate and
service level.
(3) Acknowledge the further work that has been completed on the refreshed staff survey,
hybrid survey and workforce dashboard. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (23) Build a workforce for the future capable of delivering on our
priorities and shared ambition
Programme of Work All Programmes of Work 
1. Background
1.1 Over the last 12 months, the Council’s services have continued to experience a range
of pressures in building and maintaining their workforce capacity and capability, and
accordingly our corporate HR risk level of 16 continues to reflect these challenges. 
Accounts Commission Report - Local Government Challenges & Issues
1.2 During 2024 and early 2025, Audit Scotland conducted Best Value Workforce
Innovation audits of all 32 local authorities, and this culminated in a final publication,
issued by the Accounts Commission in August 2025 which sets out their opinion of the
current workforce position in Local Government across Scotland. Their report entitled
Delivering for the future: Responding to the workforce challenge outlines a number of
key challenges that are impacting on all local authorities and makes recommendations
for future work as set out below: 
1.3 Local Government Challenges
• Councils face financial pressures and increasing service demands, impacting
workforce wellbeing and recruitment.
• Workforce planning needs better alignment with strategic priorities, improved
data use, and staff engagement.
• Staff are central to service delivery; councils must prioritize development,
address absence, and embrace innovation.
• Recruitment & retention are impacted by a competitive labour market, pay
erosion, and skills shortages.
• Health deterioration and demographic shifts intensify pressures on an ageing
workforce.
• There are wellbeing concerns related to rising stress and mental health issues;
staff feel less inspired.
Page 19 of 216

Page 20

Report Recommendations
1.4 The recommendations for all councils set out in the report include: 
Workforce Planning
• Align workforce plans with corporate
strategies.
• Expand data collection and engage staff
meaningfully. 
Digital Technology
• Accelerate transformation and assess digital
skills gaps.
• Monitor impact on productivity.
Hybrid Working • Formalise policies and measure outcomes. 
Workforce Development
• Assess current skills and report on
development impact.
• Monitor agency staff use. 
Shared Services • Explore joint roles/functions and learn from
successful collaborations.
Impact Measurement • Strengthen scrutiny and develop reporting
tools.
• Use quantifiable metrics
Best Value Workforce Innovation Report 2024
1.5 The Council’s Best Value Thematic Audit was undertaken by Audit Scotland in early
2024 and reported to Policy & Strategy in August 2024 (Best Value Audit Workforce
Innovation). The report identified several areas of good practice including the fact that
our service workforce plans are robust, covering key service challenges, gaps, and how
the service needs to adapt, with references to the council’s strategic priorities and how
they will support delivery of the Programme of Work. 
1.6 The report outlined 3 areas for recommended action as set out below. These have now
been actioned and details are summarised below and encompassed within the report
and the workforce dashboard. 
Area Recommendation Current Status
1. Acting on staff
engagement
feedback
As the council develops its
staff engagement
approach, it should ensure
that as well as providing
information to staff on
council decisions, it also
incorporates the views of
staff and trade unions to
support transparent
decision making, and
evidence how it is acting
on findings from the
Summer 2024 Roadshow
sessions.
The Councils revised staff
survey based on the fair work
first framework, has now
been fully developed and
piloted in three services
initially, covering more than
800 staff, with a plan to roll
out to all services in the
coming year. The content of
the survey has been agreed
with Trade Unions and
includes questions relating to
the Programme of Work and
the Plan for North
Lanarkshire.
Page 20 of 216

Page 21

Further work to develop the
survey and the next series of
employee roadshows is
underway and will be taken
forward in early 2026.
2. Hybrid working
policy
The council should
continue to monitor the
impact of its hybrid
working approach. It
should continually assess
the impact of increasing
the number of office days,
in terms of performance,
staff wellbeing, and
recruitment and retention.
The Council’s final hybrid
working survey has been
developed and issued to all
relevant staff to assess the
effectiveness of our
permanent hybrid working
policy which was implemented
in late 2024. 
3.  Temporary
workforce
The council should include
data reporting on its
temporary workforce as
part of published
workforce data, and once
available it should include
data on agency workers.
Data on temporary workforce
is now included within the
Workforce Dashboard and
data regarding agency
workers is currently reported
through the Workforce
Steering Group providing
oversight and governance. 
One Workforce Strategic Priorities
1.7 In the current challenging context, and with a requirement to make progression on
building capacity in our workforce and making the required workforce changes which
will enable the delivery of our future operating model, we consider that our One
Workforce Strategic Priorities as set out below in figure 1 remain fully valid and aligned
to the key areas of workforce change and risk that we need to progress. 
Figure 1 – One Workforce Strategic Priorities to 2028 
Page 21 of 216

Page 22

1.8 Set out in the remainder of the report below is a full summary of the key workforce
challenges; our refreshed service workforce plans; a summary of our progress against
the corporate One Workforce Plan and the detailed actions that will be taken forward
in the coming year to address gaps and mitigate risks. Both the corporate action plan
and highlights of the service actions are detailed under our six strategic workforce
priorities. 
2 Report 
Summary of Service & Corporate Workforce Plans & Actions
Service Workforce Challenges
2.1 Whilst each service has outlined its own distinct challenges and priorities, several
common themes have emerged from a full review of the detailed service plans. Taken
together, these themes present a broadly consistent and up to date picture of the
council’s workforce challenges, aligning under six overarching themes:
Ageing workforce and succession 
2.1.1 Many services are reporting a high proportion of staff over 50 across leadership,
technical and frontline roles, creating ongoing and future workforce capacity and
succession pressures. This is particularly evident in Adult Health & Social Care, where
55% of the workforce is aged 50 or over, and Land and Waste with 50% of staff
expected to reach retirement age within the next two to three years. Similarly, FSS are
reporting that 61.9% of staff are aged 50+ but positively and with focused action, this
has reduced from 64% in 2023. Housing, Greenspace and Country Parks and Roads
and Assets also report an aging workforce profile with Housing reporting more than 280
staff aged 50–59; Cemeteries Chargehands and Supervisors average age reporting as
58 and 59 respectively and 75% of roads inspectors aged 50+. At a corporate level,
Strategy & Engagement report that 53% of the overall workforce are aged 50-59
therefore succession planning and knowledge transfer are key considerations.
Recruitment and retention in critical roles
2.1.2 Services continue to face challenges attracting and retaining staff due to rates of
retirement, turnover, known market shortages and competition within the external
labour market. This includes turnover in areas such as Adult Health & Social Care with
24 new social workers being recruited over a period of 12 months but 19 leaving.
Similarly, 73 staff have been recruited into home support but 119 have left with the
majority being due to retirement. Additionally, there are ongoing recruitment shortages
in a variety of both frontline and professional/technical roles, which include skilled
trades, technical specialists, drivers, catering and cleaning staff, planners, EHO’s, clerk
of works, quantity surveyors, IT specialists, solicitors, project managers, roads
engineers, and some teaching posts. These shortages continue to place pressure on
services, with some services having to rely on supply staff and an ongoing need for
overtime in bigger frontline services to meet essential service demand. There has also
been a rise in sponsorship enquiries from services, and requests for more flexible
contracts and working hours to improve retention. Many services have introduced
apprenticeship, trainee and graduate routes to build their own future workforce, but
these need to be increased in scale and are sometimes limited by the availability of
experienced mentors and managers to support and develop trainees. 
Skills gaps and evolving service demands
Page 22 of 216

Page 23

2.1.3 There is widespread acknowledgement within service workforce plans of the need to
build greater capability in future skills areas such as digital and AI. Several services
report a mismatch between current workforce skills and those required to meet
changing priorities. For example, Adult Health & Social Care report needing more staff
skilled in complex care, digital case-management and a need to strengthen
assessment and community-based support skills. Housing highlights the need for
greater expertise in sustainability, fire safety and digitisation of processes. Land &
Waste identify the need to upskill frontline staff to use more modernised digital
equipment such as technical maintenance of vehicles, automated route planning and
transitioning staff to more flexible remits, for example moving to multiskilled operatives.
Across the organisation plans also call out a growing need to develop AI, data analytics
and other technical skills such as cyber security. Other areas of focus include
strengthening digital and data oversight with Finance & Technology, Audit & Risk and
Legal & Democratic all emphasising the importance of having a better understanding
of digital governance as the council adopts new technologies.
Workforce capacity and financial constraints
2.1.4 All services acknowledge that budget pressures and a need to deliver savings limit their
options regarding the recruitment and development of staff to meet service demands
both current and future, leading to prioritisation of workloads, use of supply and agency
staff, increased overtime and delays in filling key posts. Workforce plans indicate that
this issue is felt universally, but most acutely in key operational services which are
subject to greater fluctuations in demand, high absence and an aging workforce profile.
Adult Health & Social Care report difficulties in meeting increasing care needs within
existing resources and both FSS and Land & Waste face challenges in covering
essential roles across large, dispersed workforces, at times relying on overtime and
agency staff. 
Service Change and Transformation
2.1.5 As expected, and in line with our transformation goals, many services are undergoing
organisational change that is reshaping their workforce profile, skills and ways of
working. This includes proactively seeking to adopt new technologies or improve
process and service efficiency alongside absorbing changes to legislative or statutory
duties - such as new education and social-care policies and housing legislation.
Education & Families is implementing the Empowered Clusters model, embedding a
new senior-leadership structure and refining the early-years’ operating model,
alongside national reforms such as The Promise and new care and justice legislation.
Adult Health & Social Care is adapting to national reforms in social-care delivery,
implementing systems change to improve efficiency and shifting more provision to
community-based settings in line with our operating model ambitions. There are also
several service and structural reviews taking place across Enterprise and Communities
with Housing responding to new duties under the Housing Act and Ask & Act and
looking at systems change and process digitisation; Active & Creative Communities
undertaking a review of their management structure and operating model to align with
community hubs; FSS is reorganising to improve the flexibility and consistency of its
services; Land and Waste are modernising specific functions, Roads & Assets through
the rollout of the CONFIRM asset-management system and the exploration of AI-
supported inspections; Protective Services shifting to a cloud-based case-management
system; Greenspace implementing a new operating model and workforce changes
linked to the Watersports Centre redevelopment; Place are undertaking a structural
review to implement their new “Invest in NL” approach and Built Environment are
undertaking digital and planned process improvements to strengthen efficiency and
customer service.
Page 23 of 216

Page 24

Workforce wellbeing, inclusion and engagement 
2.1.6 Many services highlight staff wellbeing concerns and pressures arising from service
delivery demands and other planned structural and transformational changes,
particularly in intensive frontline services. This includes concerns over rates of mental
health absence in several services including Adult Health & Social care who note the
challenge of sustaining frontline workforce capacity in the face of rising service
demand, compounded by the introduction of new systems and ways of working and
high levels of overtime. Similarly, Education & Families note high levels of mental health
related absence in the teaching workforce, as well as challenges in sustaining the
wellbeing and resilience of frontline social workers, particularly given the demanding
nature of the role and the high proportion of staff already in older age brackets. FSS
and Land & Waste also report challenges with absence and turnover in manual roles,
with additional challenges around high levels of absence related to bone muscle and
joint issues given the physical nature of these roles and the age demographic of the
workforce. In terms of inclusion, services are reporting more positive improvements,
with Place increasing its proportion of staff from minority ethnic backgrounds from 2%
in 2023 to 5% in 2025, whilst other services such as Audit & Risk, highlight the need to
improve diversity, particularly at senior and professional levels. Several services,
including Adult Health & Social Care and Education & Families, also emphasise the
importance of building a workforce that better reflects the diversity of the local
population, with particular attention to inclusive recruitment and progression pathways
in under-represented roles.
Plans & Actions 
2.2 The full One Workforce plan of work is outlined in detail in the One Workforce Delivery
Framework that is attached in appendix 1. This includes progress highlights for 2024/25
and our rolling plan for 2025/26. A summary of relevant actions planned within service
workforce plans are summarised below.
Priority 1 – Managing Workforce Transition
2.3 The key strategic objectives aligned to this priority are: 
• Map how our services will evolve their delivery model.
• Maintain a strong focus on workforce planning.
• Deliver effective workforce change.
• Review our pay and grading model.
• Maintain effective workforce policies.
Corporate Actions – Progress & Highlights 
2.4 Key highlights aligned to our corporate plan of work under this priority include that:
2.4.1 All budget savings and service reviews with a direct workforce impact aligned to
previous decisions taken by the Council have been fully progressed in line with the
Council’s managing workforce change policies. This includes the full progression of
agreed savings within our CLD service, completion of the redesign of our ASN
workforce and the review of clerical support in Adult Health & Social Care. In the coming
year, People Resources will continue to support Chief Officers and Managers to
effectively deliver future service and structure reviews and any decisions taken as part
of future budget savings that have a workforce impact.
Page 24 of 216

Page 25

2.4.2 The People Resources Service continue to support strong workforce planning across
the council and from March and September 2025, Chief Officers from all services were
engaged in developing their detailed Workforce Plans for the period 2025–2027. These
were completed utilising an improved process with a focus on several critical areas
including a full consideration of the workforce impact of known and planned service
changes; establishing an up-to-date picture of workforce data and demographics;
assessing capacity and formulating strategies for dealing with gaps and planning for
future workforce skills needs. Importantly, all plans have a clear action plan set out for
each service outlining work to be taken forward over the next two years, and this will
be monitored as part of the One Service Board.
2.4.3 Work to complete the mapping of the next evolution of service operating models aligned
to community hubs and our wider operating model transformation is underway, and this
is being led by the Operating Model Delivery Manager supported by the OD Business
Partners. A fuller update on this will be provided within the Leadership and Operating
Model update paper which will be presented at Policy & Strategy in December. 
2.4.4 Work continues on phase 1 of the review of our pay and grading model, with the Project
Board now fully established and trained. The alignment of the Council’s pay and
grading model to the COSLA scale is now complete and was processed in August 2025
along with the implementation of the pay award for SJC staff. Additionally, a further up
to date analysis of key areas of risk within our current model has been obtained from
the Independent Technical Adviser, and this is currently being used to inform the
remaining work aligned to complete phase 1. A fuller update on this review, including
the remaining work to be concluded in phase 1 will be presented to Finance and
Resources in Cycle 1 of 2026. 
2.4.5 Under our commitment to maintaining effective workforce policies, we will be taking
forward 2 key changes during early 2026 namely: 
Update to our Flexible Retirement Guide
2.5 North Lanarkshire Council is required to update its Flexible Retirement Guide in
response to a directive from the Scottish Public Pensions Agency (SPPA), dated 6
August 2025, which confirms that rejecting applications solely on the basis of cost is
legally unfair and unreasonable. Previously, the Council declined applications where a
financial cost was identified; however, under the revised guidance, all applications must
now be assessed individually, taking into account service delivery requirements,
personal circumstances, and potential cost mitigation strategies such as delayed
recruitment or restructuring of the post. In addition, the appeals process has been
strengthened, and following agreement with the trade unions, any applications refused
since August 2024 will be reviewed to ensure fairness and transparency. The Council’s
Pension Discretion Policy has been amended to reflect its legal obligation to consider
associated costs in line with the SPPA directive, supporting equitable, transparent,
and legally compliant decision-making across all flexible retirement applications. 
Long Service Award Scheme
2.6 Following a motion to Council from Elected Members the council has been asked to
further consider recognition of the valuable contributions made by long-serving
employees. Accordingly, consideration is now being given to the introduction of a
formal Long Service Awards scheme. 
Page 25 of 216

Page 26

2.7 Currently, several local and public sector organisations operate long service
recognition schemes. Such initiatives are known to foster a culture of appreciation and
respect, contributing positively to employee morale and retention. However, any
proposed scheme must be carefully evaluated in terms of cost implications and
potential equality considerations. 
2.8 The Council is exploring a low-cost, meaningful approach to recognise service
milestones at 25 and 40 years. The following options could be considered:
• Additional Annual Leave
• Voucher Equivalent to Monetary Value
2.9 All proposed options will be subject to detailed costing, consultation with CMT and the
trade unions and approval at Committee. Any final decision will be aligned with the
Council’s One Workforce Plan, reinforcing our commitment to valuing employee loyalty
and fostering a positive and inclusive working environment. Development of the
scheme will take place over the next few months, with implementation anticipated in
early 2026. 
Planned Service Actions - Highlights 
2.10 Highlights of relevant planned service actions aligned to the managing workforce
transition priority are set out in the table below. 
Service Directorate Workforce Actions
Chief Executives • Legal and Democratic plan to review job descriptions
and evaluations to ensure stronger alignment with
service priorities and future workforce needs. This
includes stronger partnership working with HR and
Finance & Technology services through cross-
training and shared knowledge opportunities.
• Legal & Democratic also plan to modernise systems,
establish continuous improvement programmes and
apply digital solutions where possible, with a
requirement for public facing service transformation
and modernisation through enhanced digital
platforms, improving accessibility for diverse service
users, enabling self-service offering alternatives to in-
person transactions all of which will impact on the
skills of the current workforce.
• Finance & Technology are preparing to undertake a
workforce review in relation to AI implementation,
data cleansing and recent outputs from improvement
workshops, noting that the future service workforce
requirements will be shaped by a need to support an
increasingly wider digital infrastructure including
public Wi-Fi, third-party connectivity across
community-focused venues such as leisure centres,
public access computing, community hubs, and
learning spaces including considerations for security,
IOT, AI and OOH support.
Page 26 of 216

Page 27

• Finance & Technology are also planning to review
current job descriptions to see if roles can be
reconfigured to broaden out skills and knowledge
across the team with an intention to set up a small
review team to support better cross working across
both functions, greater consistency in approach and
sharing of best practice.
• People Resources are planning to review and
realign their back-office functions and processes to
better integrate newly implemented systems,
improve workflow and communication and create
stronger cross skilling between teams with better
alignment to services.
• Audit & Risk are planning to strengthen digital
governance capabilities and oversight of AI use
across the Council.
Enterprise &
Communities
• Place will undertake a review of the current
management structure and grades within Planning,
particularly at 3rd tier manager level, to assist with
succession planning and attraction.
• Place also report demand pressures within the Invest
in NL/ Major applications team, with a number of
complex planning applications anticipated. There is
a need to review the current resources and
management structure to ensure sufficient capacity to
deal with these applications efficiently.
• Additionally, Place also have a requirement to ensure
adequate resources to deliver the Mid-Market Rent
(MMR) Programme, and will undertake a review of
the resource required to deliver the programme as
well as the increased social rent target.
• ACC are planning a review of the operational
management team to align roles to deliver against the
wider community hub and community engagement
model and in addition continued consideration of a
rationalised estate for both sports facilities and
libraries is likely to result in associated changes in the
staffing model.
• The new Housing Ask and Act requirement could
potentially have an impact in workforce demand, and
the service will make an assessment of this when
guidance from the Scottish Government has been
issued.
• Fleet services are planning ongoing structural
changes to improve efficiency, ensure compliance
with governance, legislative and policy requirements
and supporting the transition to digital solutions to
improve customer experience and driving service
improvements.
• FSS report that they will be reviewing hospitality
services with potential impact to staff and operating
models which will be agreed through the review
process. They will also be undertaking a restructure
of community facilities management including the
introduction of a new supervisor level for caretaking.
Page 27 of 216

Page 28

and will be directly impacted by the council’s
programme of new build schools and community
hubs over the next 5 years with additional support
required from the service.
• The Greenspace & Country Parks Service report that
the Cemeteries workforce is dealing with the twin
pressures of an expanding asset portfolio to maintain,
and an ageing workforce resulting in higher absence
and turnover, with weekend overtime frequently
deployed to keep up with interments.
• Land and Waste will be progressing the introduction
of more automated and data-driven route planning
through new systems, with an increased focus on
recycling performance and compliance with national
circular economy targets.
• Trading Standards is experiencing resourcing
challenges, and the team faces limitations in
delivering a fully effective consumer and legitimate
business protection service with some statutory
duties  being more of a challenge.
Adult Health & Social
Care
• Adult Health & Social Care intend to finalise their new
operating model, align resources and maintain
overview of performance until revised service
provision is fully functional. This work includes
progressing better joined up services across health
and social care, operating as multi-disciplinary teams,
with a need to realign and remodel support roles to
meet demand and ensure resource is allocated in the
right place.
• There will also be a requirement for better defined
roles and responsibilities around assessment and
planning, which will be key to the new operating
model going forward.
• The service also intends to continue to review
structures and introduce a training and development
plan to support the successful operation of the new
model.
Education & Families • Education & Families are planning to support and
embed the new ASN model, building capacity within
the ASN workforce by taking forward improved
communication and secondment opportunities.
• The service notes that with several large-scale
transformational change programmes recently
completed or underway, including Additional Support
Needs, Early Learning and Childcare, Senior
Management Team and Family Support, strong
change leadership will be key to avoiding
challenging  impacts on service delivery.
• The Service will also require more Teachers in order
to implement the SG 21hrs class contact policy and
preparatory work around workforce planning.
Preparatory work has been underway for several
years and will continue via measures such as the
teacher induction scheme, the use of fixed term
Page 28 of 216

Page 29

contracts and internal ring-fenced posts as well as
external recruitment campaigns. 
Priority 2 – Pathways for Progression
2.11 The key strategic objectives aligned to this priority are:
• Identify opportunities for funded skills and qualification pathways.
• Improve recruitment processes & progress inclusive recruitment.
• Work with Routes to Work to provide employment to residents.
• Maintain a strong development offering for staff.
Corporate Actions – Progress & Highlights 
2.12 Key highlights aligned to our corporate work under this priority include that:
2.12.1 The Council continues to invest in the development of funded qualification pathways,
particularly to close identified professional skills gaps. Key areas of progress over
2024/25 include the full approval and completion of the Graduate Apprenticeship
framework for Social Work, where over the past year, North Lanarkshire Council has
worked in partnership with the University of the West of Scotland (UWS), Skills
Development Scotland and the Scottish Government to develop the programme which
launched in September 2025. This will enable the council to progress an initial cohort
of 6 council staff onto a fully funded study route to become a qualified Social Worker,
with plans for a regular intake into the programme thereafter. The programme will offer
additionality within our already comprehensive Social Work Hub ensuring that we have
a robust future pipeline of Social Workers. 
2.12.2 Additionally, in January 2025, the council partnered with the University of the West of
Scotland to launch a Graduate Apprenticeship (GA) in Planning, with three Trainee
Planning Assistants now in post. This marks a significant step in tackling workforce
gaps identified in the Place workforce plan. 
2.12.3 Progress has also been made on the establishment of a new funded pathway and
trainee position for Clerk of Works, which has proved a very difficult role to fill over the
last few years. Priority work is also underway to progress a work-based learning
solution for the development of a future pipeline of Environmental Health, and Trading
Standards Officers, both of which have a significantly aging workforce profile.
2.12.4 Work is being finalised on improvements to our overall approach to recruitment with a
new standalone policy being finalised; completion of an automatic systems link
between iTrent and MyJobScotland, to eliminate double handling and facilitate
automatic posting of jobs; the development of three new application forms that are more
appropriate for different levels/types of jobs and the simplification of our shortlisting
processes to improve the recruiting process overall. All work is expected to be complete
in early 2026. 
2.12.5 Work will also be prioritised in early 2026 to look at ways in which we can improve our
recruitment tracking and advertising for hard to fill roles, particularly those aligned to
support the delivery of our programme of work and capital programme such as Quantity
Surveyors, Planners and Project Managers. 
2.12.6 We also continue to work effectively with our partner Routes to Work to offer entry level
opportunities to residents who have struggled to gain employment in the labour market.
Over the last 12 months this has resulted in the following successes through ring fenced
recruitment: Page 29 of 216

Page 30

• 8 Catering Assistants
• 4 Cleaners
• 1 Facility Assistant
• 4 Support Assistants in the Employee Service Centre
• 2 Streetscene Operatives
• Interviews taking place throughout October in Land & Waste for more
opportunities. 
2.12.7 In addition, 3 Routes to Work clients from previous recruitments have been offered
permanent posts and 2 have been promoted into full time NLC7 grade roles. 
2.12.8 To further support and accelerate the ongoing transformation of our services and in
consultation with Chief Officers around future skills needs within our senior manager
population, the People Resources Services have now developed a Transformational
Leadership Programme which will initially be targeted at 3rd and 4th tier officers. The
key elements of the programme are set out below and will include service design,
process improvement and digital modules alongside other complex change leadership
skills and development:
• Scottish Approach to Service Design (SAtSD)
• Process Mapping and Lean Thinking
• Successfully Leading Complex Change
• Understanding Equalities Responsibilities
• Programme Management Skills
• Influencing for Results
• Cultivating a Digital Mindset (linked to the new Digital Competencies
Framework being developed)
2.12.9 The programme will be piloted and refined in early 2026 and rolled out to all eligible
staff thereafter.
Planned Service Actions - Highlights
2.13 Highlights of relevant planned service actions aligned to pathways for progression are
set out in the table below. 
Service Directorate Workforce Actions
Chief Executives • Legal and Democratic intend to secure funding,
recruit to traineeship posts, deliver structured case
exposure and mentoring and monitor external legal
spend for skills and knowledge gaps.
• Legal & democratic have a structured progression
framework that supports internal mobility and
development, ensuring staff can prepare for future
specialist and leadership roles. Staff are actively
encouraged to pursue external training and
qualifications, such as the BA Leadership
Qualification and HNC in Business Administration, to
strengthen career readiness.
• Legal & Democratic report a need for workforce
upskilling in digital advocacy, case management
systems, and specialist areas (climate law, data
protection claims, procurement challenges). Page 30 of 216

Page 31

• Finance & Technology expect to see new demand for
hybrid skill sets that will combine technical expertise
with service design, change management, and
stakeholder engagement.
• Finance & Technology will also identify suitable
training programmes for leadership and management
and encourage uptake from existing staff and will
review and develop formal mentoring opportunities.
• Audit & Risk report a need to support staff to further
develop their skills across relevant areas including
technological and methodological skills, project
management skills, digital skills, sector and cross-
government knowledge.
• Audit & risk also report that there is a gap for a
dedicated counter fraud resource (as highlighted in a
previous audit report and noted on the risk register).
• People resources have identified a need for up
skilling and cross skilling within the Employee Service
Centre to support the integration of new systems and
facilitate a deeper understanding of the full range of
Council wide Terms and Conditions of Employment
across the various services.
Enterprise &
Communities
• Place and Housing both reference the need for
experienced mentors to support trainees.
• Due to continued recruitment difficulties, Housing will
further review the Housing Advisor NLC7/9 Grade,
specifically the criteria for progression from NLC7 to
NLC9.
• Housing will also develop a closer integration
pathway to allow staff development and widen
opportunities for career progression to address
succession issues.
• Place notes that consideration needs to be given to
current grade progression for Roads Engineer
Trainees to improve prospects of being able to retain
them.
• Additionally, place will create an Assistant Manager
post to support the Invest in NL Manager to help
manage workload; co-ordinate input from other
services/ consultees, sign off planning approvals and
prepare/present committee reports.
• Asset & Procurement note that continued challenges
in recruiting staff to professional and technical roles
are likely to continue and require the service to grow
their own talent. 
• Built Environment reports that existing national and
local workforce strategies have strengthened the
operational resilience of the service with actions
taken in recent years around the progression of
Graduate Apprenticeships within the Service. This
has gone some way to addressing their high age
demographic.
• Fleet report that the recruitment of seven new
employees has enabled the workshop to operate at
Page 31 of 216

Page 32

full capacity, with apprentices and semi-skilled
Workshop Assistants currently progressing towards a
full qualification in Mechanics. Fleet Technicians are
also gaining valuable experience through
collaboration with our Fleet Inspectors, supporting the
development of a consistent and skilled workforce.
• Roads & Assets report that recruitment of street
lighting staff, including inspectors is an issue across
Central Scotland. The service are considering a
restructure to change the role to a technician with
different qualification requirements and are also
considering a modern apprenticeship route. The
Assets Team has also created a number of new
roles for graduate apprenticeships and a possible
modern apprenticeship.
• FSS are considering their approach to addressing
shortages for cleaning supervisors as current
compression within the council’s grade structures
means that the salary differential makes it
unattractive for cleaning staff to apply for these roles.
• Greenspace & Country Parks experience difficulties
in recruiting to gravediggers, cemeteries
chargehands and arborists. The service has
introduced an MA programme to grow a pipeline of
talent through an MA programme that will move
candidates through Cemetery Asset Operative roles
and potentially on to Gravedigger, Chargehand and
Supervisor.
• Land and Waste are considering further structure
changes to support multi-skilled roles and flexible
deployment across land and waste functions,
transitioning current role titles—such as Refuse
Collector, Gardener, Driver 1, Streetscene Operator,
and Recycling Attendant to a unified title General
Operative. The service proposes to gradually phase
in the new title as part of the recruitment process for
new employees.
• Land and Waste are also considering upskilling
initiatives to provide training to current staff to
address skill gaps, in HGV driving, mechanical and
technical maintenance and modern playground
equipment upkeep.
• Assets & Procurement will explore further
opportunities to develop technicians by supporting
them to undertake further study to achieve relevant
qualifications. The service will also focus on training
and developing staff inhouse including supporting
graduates  to  become  fully  qualified  Quantity
Surveyors.
Adult Health & Social
Care
• Adult Health & Social Care reports a continued
commitment to build resilience, grow their own talent
and create opportunities for individuals to progress
into qualified roles. The service now has several
programme pathways that support employees to
become Social Workers.
Page 32 of 216

Page 33

• To strengthen leadership capacity within social work,
the implementation of a comprehensive Leadership
Programme tailored specifically for Senior Social
Workers (SSW) and aspiring SSWs will enhance
strategic thinking, decision-making, and team
management skills, while fostering resilience and
innovation in complex care environments
• The service also reports that increasing demand and
complexity of individuals requiring support, risks
putting additional pressure on teams and that they are
committed to ensuring that direct delivery workers
have the skills, knowledge and to deliver complex
care packages. The service has recently reviewed its
organisational training and development plan,
introducing a range of additional learning
opportunities for staff directly delivering services.
• Additionally, they have reviewed the Social Work
Induction material and are utilising a range of tools
developed through the Healthcare Improvement
ScotlandNational Induction Framework/Programme.
Education & Families • Education & Families report changes in the focus of
roles across their service as well as the introduction
of new roles including: increasing focus on inclusive
practice, trauma-informed approaches, and digital
pedagogy for teachers and head teachers; a
requirement for greater involvement in multi-agency
planning and wellbeing strategies for Cluster
Improvement Leads and Educational Psychologists
and enhanced collaboration between Social Workers
Family Support Workers and education teams to
deliver whole-family support.
• Education & Families also note that leadership and
change management will be key as services
restructure and evolve, to drive innovation and
sustain improvement.
• The service also notes a requirement to focus on
building skills in leading cluster teams, managing
delegated budgets, and driving improvement through
data-informed planning. 
Priority 3 – Next Generation Workforce
2.14 The key strategic objectives aligned to this priority are: 
• Maintain a healthy apprenticeship offering with linked pathways from school.
• Maintain a strong summer placement offering across services.
• Take forward a new graduate/intern scheme to develop a pipeline of future
managers.
Corporate Actions – Progress & Highlights 
2.15 Key highlights aligned to our corporate work under this priority include that:
Page 33 of 216

Page 34

2.15.1 The Council continues to progress and grow its Modern Apprenticeship scheme with
offerings for new pathways for young people. Following an extensive recruitment
campaign, 56 MA’s were recruited in 2025, completing our full allocation of MA from
just the summer recruitment. New MA programmes include a shared MA programme
with NHS Lanarkshire and Health and Social Care MAs within our Home Support
Teams.
2.15.2 Our Summer Placement Programme continued to grow in 2025 with 191 young people
successfully placed in a variety of disciplines both within the Council and our external
partners. Notably all 191 placements completed the programme and additionally we
introduced an employability award to complement the experience gained by the young
people with 177 completing the award. Importantly the programme is now delivering
real outcomes and opportunities for young people including employment within the
Council and a summary of this is provided below: 
Internal Programme 
• 19 young people secured sessional contracts within Enterprise and
Communities
• 22 young people secured sessional contracts within Adult Health and Social
Care
• 1 young person gained part time employment with the Council
• 2 young people commenced a Modern Apprenticeship with the Council
• 1 young person commenced a Graduate Apprenticeship with the Council 
External Programme
• 5 young people commenced a Modern Apprenticeship
• 1 young person commenced a Graduate Apprenticeship
• 5 young people gained part time employment
• 2 young people gained full time employment
• 1 young person commenced pre- apprenticeship training 
2.15.3 Additionally, the council is currently investigating the feasibility of a summer intern
programme which would support the development of succession pipelines for our
middle and senior management levels. Management succession issues have been
highlighted by a number of services in their workforce plans. This would be based on a
similar programme currently run by Glasgow City Council and would be ringfenced to
recent graduates with a North Lanarkshire postcode, or those who are in their final year
of study. This would include direct engagement with universities in degree subjects that
are currently hard to fill such as Quantity Surveying, Architecture, Law and
Accountancy.
Planned Service Actions - Highlights
2.16 Highlights of relevant planned service actions aligned to next generation workforce are
set out in the table below: 
Service Directorate Workforce Actions
Chief Executives • The Finance & Technology service has made a
concerted effort to “grow its own” over the last few
years, through modern apprentices, summer
placements and encouraging and supporting existing
staff  to  undertake  qualifications.  The  Trainee
Page 34 of 216

Page 35

Accountant programme has been reestablished and
has been extended to the next level with assistant
accountant trainee programme under development.
Similarly, the Technology service has made good use
of both Modern Apprenticeship and Graduate
Apprenticeship frameworks across a range of IT and
Cyber Security qualifications to focus on building a
next generation workforce.
• Finance & Technology also expects to lose several
skilled, experienced managers/leaders over the next
few years and the service are continuing to review
opportunities available to more junior members of
staff who could progress to managerial levels.
• Legal and Democratic have secured funding for a
Solicitors Traineeship Programme with three
additional 24-month traineeship posts, providing early
career legal professionals with structured training,
mentoring, and sector-specific experience.
• Legal & Democratic have also continued to invest in
Modern Apprenticeships within business support
pathways for young people into long-term
employment. Positive outcomes are already evident,
with a Modern Apprentice in Licensing successfully
securing a full-time position.
• Audit & Risk intend to review career pathways for the
Audit & Risk Assistant and assess potential to create
an additional post at this level to increase entry level
posts to the teams or consider increased role of
trainee accountant placements. The NLC6 Audit &
Risk Assistant was an action following the 2023
Strategic Workforce Plan to introduce a career entry
point to this team.
• Audit & Risk are also planning to create a permanent
trainee accountant post with a development pathway
to become a qualified auditor.
• People Resources support several development
pathways across the service for both professional HR
qualifications and graduate apprenticeships. In
addition, the service supports a yearly cohort of
Modern Apprentices many of whom have progressed
into entry roles within the employee services centre.
• Given their aging workforce profile, Strategy &
Engagement are looking for ways to enable career
progression pathways the 11% of the overall
workforce who are aged 18-29, as well as investing in
both Graduate and Modern Apprenticeships.
Enterprise &
Communities
• Place currently have 7 Trainee posts across the 3
teams who are being supported to gain relevant
professional qualifications which has knock on
resource implications for the workload of the teams.
• Place have also created a new pathway by
introducing a Trainee Clerk of Works (NLC3) that will
study for the degree in Construction and the Built
Environment (Building Surveying) as a graduate
apprentice for four years and will then be able to apply
Page 35 of 216

Page 36

for a Clerk of Works (NLC9) post. A new Senior Clerk
of Works is also being recruited to line manage
Trainee Clerk of Works.
• Given the difficulty that Place are experiencing in
filling critical professional roles, consideration will also
be given to creation of additional trainee posts,
particularly Quantity Surveying and Civil Engineering,
subject to capacity to provide necessary support and
supervision/ mentoring.
• ACC report real challenges in recruiting Lifeguards.
The service has attempted to address this through
providing training programmes for young people, for
example, lifeguard qualifications (RLSS), and are
proposing to explore this further. The service also
takes in a large number of young people on
placement and this often leads to employment
opportunities and assists with workforce challenges.
• Fleet report a new requirement for a Plant
apprentice. This role will ensure there is a
succession plan within the workshop, aligned to an
industry wide gap in the market for this role.
• Land and Waste report difficulties recruiting a
younger demographic into the service but will be
looking at succession planning with apprentices
working towards qualification.
• Protective Services report that the introduction of the
Trading Standards Practitioner post in 2020 has been
particularly successful, resulting in one employee
progressing into a permanent NLC11 Trading
Standards Officer role and the recruitment of an
additional Practitioner. Furthermore, the service has
established trainee positions across both Trading
Standards and Environmental Health, which have
proven highly effective. To date, two trainees have
now secured permanent roles.
• Given a need to increase awareness of the resilience
planning function and a shortage of officers with this
skill, Protective Services are planning to take a
summer intern from risk management students at
GCU to develop internal training pathways, with
specialist qualifications and will explore funding
opportunities to expand the team.
• Housing are considering a graduate programme to
support future demand for Housing Officers and
Income Maximisers where they have a relevant
qualification but need trained in Housing.
Adult Health & Social
Care
• Adult Health & social Care report that there remains
a shortage of staff with advanced skills in mental
health. To help address this, the MHO Traineeship
Scheme has been introduced, enabling two social
workers to temporarily fill posts while undertaking
their Mental Health Officer training.
• Additionally, they will continue to offer summer
placements as a career progression route along with
shadowing, mentoring and coaching for new staff; a
Page 36 of 216

Page 37

targeted recruitment campaign is being considered to
further promote careers within the sector and
encourage uptake of the MHO trainee scheme to
build capacity.
Education & Families • Education and Families are focused on building
career pathways and secondment opportunities in
key areas including ASN specialists, STEM and
Digital Education Specialists.
• The Service is also planning to use a variety of
strategies to support succession planning with an
ageing workforce, such as secondment and cpd
opportunities,  summer  placements,  modern
apprenticeship, career pathways and vocational
education programmes. 
Priority 4 – Vibrant & Flexible Workplace 
2.17 The key strategic objectives aligned to this priority are:
• Continue to build a vibrant mixed use offering of office and community-based
workplace environments for all staff.
• Invest in a digitally skilled workforce, who can work efficiently and flexibly within
our community-based locations. 
Corporate Actions – Progress & Highlights
2.18 Key highlights aligned to our corporate work under this priority include that: 
2.18.1 Significant work has been undertaken over the last 12 months to enhance workspaces
and facilities for staff working our community facing services for example recent
investment in our Bellshill Depot for our Fleet and Waste services with plans to also
further adapt and utilise this space for other services. A full outline of this work will be
included within the Leadership and Operating Model report which will be presented to
Policy & Strategy in December. 
2.18.2 Work to deliver the digital skills programme continues under the leadership of the Digital
NL Programme of Work, with key deliverables including: 
• Utilising information from the digital skills survey to identify digital skills gaps
• Creating and developing digital leadership skills to create a culture of digital first
approach with competent and capable leaders to support digital development
• Ongoing work on a digital skills competency framework to assist with skills gaps
identification and planning. This will be supported by a self-assessment tool for
staff to identify their current level of digital skills and identify development for the
future.
• Investment in upskilling our staff to enhance their digital capabilities.
Planned Service Actions - Highlights 
2.19 Highlights of relevant planned service actions aligned to vibrant & flexible workplace
are set out in the table below.
Page 37 of 216

Page 38

Service
Directorate
Workforce Actions
Chief
Executives
• Legal and Democratic are looking to develop digital and process
training programmes and rotate staff to build multifunctional
skills.
• Legal & Democratic also note a requirement to build digital
competence, including the ability to work with case
management systems, digital dictation, and e-democracy
platforms.
• Finance & Technology are promoting agile working for
technology staff to promote a flexible, fully collaborative
workforce, this will support the expected rise in community
hubs, pop up services and agile work practices across the
Council.
• Finance & Technology are also supporting staff to be resilient in
working with technological changes whether it’s software
development, infrastructure projects, cyber security or service
management.
• Audit & Risk note that the Council’s hybrid scheme has been
beneficial in attracting external candidates who do live further
away to minimise the commute days.
• Strategy & Engagement note that the Councils hybrid and
flexible work policies support attraction and retention for
employees who live locally and have seen success with modern
apprenticeships which have provided valuable career paths for
local talent.
Enterprise &
Communities
• The Place service operates a hybrid model for most employees,
however whole teams can be site based and working out in all-
weather with potentially hazardous conditions, i.e. Clerk of
Works, Parking Services and Engineer Technical Officers with
other employees working a combined pattern of
home/office/site visits.
• ACC expect that changes to the Employment Rights Bill on the
use of casual contracts are anticipated and are likely to impact
on the use and practices with the casual workforce across the
service. The service also reports that it benefits from a local
workforce, with a predominantly site-based staffing group who
live and work in NLC.
• Fleet are planning to consolidate their workshop within the
Bellshill site and this location will be for all vehicle repairs,
services and MOTs (including taxi tests). They also report that
upskilling in electric equipment and new technology will be
required for the current workforce.
• FSS report that with the roll out of Digital devices to frontline
staff, processes will be required to be adapted to ensure
efficiency across the service. This may also require ongoing
digital support and upskilling for all staff.
• In Land and Waste 67% of the workforce are static workers and
33% of the workforce are agile/ hybrid which reflects the
frontline nature of the service.
• Greenspace & Country Parks will be required to review current
roles against changes within the new Burial Regulations and
associated digital requirements and reconfigure roles and skills
accordingly.  Additionally,  the  drive  to  digital  cemeteries
Page 38 of 216

Page 39

maintenance will require improved digital processes across the
cemeteries workforce (frontline and support).
• Protective Services report that service has a higher rate of
employees who reside out with North Lanarkshire Council
thanks average, and the hybrid policy has proved beneficial in
recruiting and retaining employees.
• Roads & Assets report that implementation of AI will enable
more automation of surveys, which will change the way
inspectors need to operate. Efficiencies should free up time to
address conflicting demands, however a higher level of IT skills
will be required (historically inspectors have come through from
front line squads). 
Adult Health &
Social Care 
• Adult Health & Social Care reports that since the introduction of
flexible retirement in 2019 there have been 76 successful
applications across all grades and service areas, this is helping
the service to retain experience and knowledge whilst it focuses
on growing its next generation workforce. 
Education &
Families 
• Education & families expect that increasing use of digital tools
and data systems will require upskilling in areas such as cyber
security, digital learning platforms, and data analytics.
• The service expects a wider digitisation of predominantly
administrative processes to be a key lever in achieving
efficiency and effectiveness across service including schools,
hubs and central teams, requiring a more digitally skilled
workforce within broader more agile remits designed to promote
continuous improvement and a more responsive service user
journey. 
Priority 5 – Employee Engagement & Wellbeing
2.20 The key strategic objectives aligned to this priority are:
• Implement a new staff survey which fully engages our staff at all levels, aligned to
our Programme of Work, and our responsibilities as a fair work employer.
• Maintain a strong staff health & wellbeing support and benefits offering under our
Workwell NL banner.
Corporate Actions – Progress & Highlights 
2.21 Key highlights aligned to our corporate work under this priority include that:
Staff Survey Pilot 
2.21.1 The development of the council’s new staff survey is now complete, and the survey has
been piloted in 3 services covering more than 800 staff in both corporate functions and
frontline services. The survey questions are simple, straight forward and designed to
be used at all levels within the organisation. All questions are aligned to the Fair Work
First Framework, and they have been shared with our Trade Union colleagues for their
input and agreement. 
2.21.2 The key pillars of the Fair Work First Framework promote employee engagement
across a range of important measures aligned to: 
• Effective Voice: Promotes safe, constructive dialogue where employee views are
actively sought, heard, and acted upon.
Page 39 of 216

Page 40

• Opportunity: Ensures equal access to employment and progression, meeting
legal obligations and promoting fairness.
• Security: Supports stable employment, predictable working hours, and income
security.
• Fulfilment: Encourages meaningful work that enables skill development,
autonomy, and career growth.
• Respect: Fosters a culture of dignity and respect for all, regardless of role or
status.
2.21.3 Questions have also been added to align with and measure employee understanding
of and engagement with the Council’s Programme of Work and the Plan for North
Lanarkshire and these will be used to support and measure the impact of future
roadshows. 
2.21.4 The survey is currently being piloted in three service areas, two large corporate
services, and one frontline service. The services currently piloting the survey include
People Resources and Finance and Technology and Fleet. Data from Fleet is limited
at this stage due to its later inclusion in the pilot and the fact that the survey is still
open.
2.21.5 67% of the staff who have completed the survey are not managers with the remainder
being managers or senior managers. The majority of staff completing the survey are
full time employees and there were more females (66%) than males (33%) completing
the survey, reflecting the Council’s known demographic.
2.21.6 Key highlights from the questions are set out below:
Page 40 of 216

Page 41

Key strengths Areas for consideration
Effective Voice
71% of staff agree or strongly agree that they are
provided with information about the Council's vision
and plans for the future.
84% of staff agree or strongly agree that they
understand what is expected of them in their role. 
76% of staff agree or strongly agree that their
manager is open to discussions about their work and
works with them to forward plan
Opportunity
68% of staff agree or strongly agree that they receive
feedback from their manager on their work. 
68% of staff agree or strongly agree that they feel
encouraged to perform at the best of their abilities.
69% of staff agree or strongly agree that they have
all the information they need to do their job well. 
Security
79% of staff agree or strongly agree that they have
clear duties and
Responsibilities.
74% of staff agree or strongly agree that their
manager supports them
when their work is challenging. 
85% of staff agree or strongly agree that they know
how to access
Council policies to support them if they have
difficulties affecting their work.
Fulfilment
69% of staff agree or strongly agree that they feel
their efforts are valued within their team and service. 
80% of staff agree or strongly agree that they are
confident that they have the knowledge, skills and
tools they need to do their job well.
80% of staff agree or strongly agree that they feel
they have support from their colleagues and work
jointly to achieve team goals. 
Respect
84% of staff agree or strongly agree that they are
treated with respect by their colleagues
94% of staff agree or strongly agree that they are
aware of the Council’s code of conduct
86% staff agree or strongly agree that their manager
shows confidence in their abilities.
Effective Voice
62% of staff agree or strongly agree that they feel
encouraged and confident to improve the way we do
things.
62% of staff agree or strongly agree that they have the
opportunity to provide input to how their service or team
operates. 
66% of staff agree or strongly agree that they feel safe
to express their views and ideas.
Opportunity
65% of staff agree or strongly agree that in the past
year they have undertaken learning activities that have
helped improve their performance. 
65% of staff agree or strongly agree that they feel
confident that they will be supported to advance their
career should they wish.
65% of staff agree or strongly agree that their manager
supports them to improve their performance.
Security
52% of staff agree or strongly agree that they are
consulted about
decisions that could affect their role or their terms and
conditions.
64% of staff agree or strongly agree that their manager
discusses and agrees their work priorities with them
regularly. 
66% of staff agree or strongly agree that their manager
communicates
effectively when changes are planned in their service.
Fulfilment
66% of staff agree or strongly agree that their work is
meaningful and gives them a sense of purpose. 
66% of staff agree or strongly agree that they
understand how what they do makes a difference in our
communities.
65% of staff agree or strongly agree that their working
environment enables them to do their job well. 
Respect
71% of staff agree or strongly agree that the culture in
their team is positive, supportive and trusting.
64% of staff agree or strongly agree that the council
supports the health and wellbeing of its employees.
65% of staff agree or strongly agree that the council
supports and encourages employees from
disadvantaged backgrounds. 
2.21.7 Key insights across all questions include that: 
• respect and values are strong across the board, especially in peer relationships and
personal conduct.
Page 41 of 216

Page 42

• role clarity and support systems (e.g. knowing expectations and accessing policies)
are well established.
• job satisfaction and purpose are evident; with many staff feeling their work is
meaningful and impactful.
• Commitment to the council is high, suggesting a stable and loyal workforce.
2.21.8 Encouragingly questions within the Respect pillar of the framework are the highest
scoring questions across the survey.
2.21.9 The question with the highest disagree scores is “I am consulted about decisions that
could affect my role or my terms and conditions” with 21% disagree or strongly
disagree. 
2.21.10 All questions score 20% or under for disagree, and for strongly disagree the range of
responses is between 1% and 6% with no question scoring more than 6% for strongly
disagree. 
2.21.11 Additional questions also show that 82% of staff agree or strongly agree that the
council has a good relationship with Trade Unions and 79% of staff agree or strongly
agree that they are happy to continue working for the council for the foreseeable
future.
2.21.12 Staff were also asked directly what they most enjoyed about working for the council
and the most common responses were:
• Flexibility, which includes hybrid working, flexitime, and work/life balance with staff
appreciating the ability to manage their schedules.
• Benefits and positive mentions of pension schemes, holidays, and overall terms
and conditions.
• Making a Difference with many feeling their work has purpose and positively
impacts the community.
Hybrid Working Survey
2.22 A refreshed hybrid survey was issued to all eligible staff in early October with an overall
return rate of 66%. The majority of staff (860) responded to all questions with some
responding to the main questions only. Hybrid employees are primarily based within
Chief Executives and Enterprise & Communities services with a small number in the
corporate teams within Education & Families and Adult Health & Social Care.
2.23 In terms of grades the majority of respondents sit within grades NLC10 to NLC12 (337
respondents) with the remainder between NLC5 and NLC9. There are 103 more senior
management staff who responded in grades NLC13 to NLC18. 
2.24 The key themes from the survey are:
2.24.1 The majority of staff are adhering to the scheme with 640 staff self-reporting that they
are currently doing 10 or more days in the office over the period of a month with 142
staff reporting that they are doing between 10 and 15 days in the office. 
2.24.2 Where staff are doing less than 10 days reasons reported for this include service needs
and a requirement to attend site and community meetings.
Page 42 of 216

Page 43

2.24.3 Satisfaction with the current hybrid scheme is very high with 510 staff reporting that
they are either satisfied or very satisfied with our current hybrid arrangements, and a
further 157 staff reporting that they are neutral on the matter.
2.24.4 The majority of staff who responded to this question are of the view that the hybrid
scheme supports their roles and responsibilities, with 437 staff reporting that it fully
supports them in their role, a further 249 reporting that it mostly supports them in their
role or that it makes no difference. 
2.24.5 In terms of questions relating to work life balance 605 staff report that hybrid working
has improved their work life balance and 510 staff report that it has made them less
stressed, with a further 179 reporting that it has made no difference. 
2.25 The results from the survey indicate that the final hybrid working scheme is working
well and has positively impacted on staff. Some additional areas that were reported in
the survey are included in the graphs below: 
Page 43 of 216

Page 44

2.26 Based on the positive feedback from the survey, it is proposed that this is the final
hybrid working survey which will be carried out with hybrid staff. Accordingly, the hybrid
working scheme will become business as usual from 2026 onwards, in terms of working
arrangements for all staff who fall within this category.
Priority 6 – Equality & Inclusion 
2.27 The key strategic objectives aligned to this priority are:
• Take forward our refreshed Equalities Strategy maintaining strong progress on
advancing our agreed equalities outcomes.
• Continue to support and progress the work of the Equalities Board, and
associated service Champions and their Service Equality Plans. 
Corporate Actions – Progress & Highlights
2.28 Key highlights aligned to our corporate work under this priority include that: 
• The Council has now fully refreshed its Equality Strategy which was approved by
the Wellbeing & Tackling Poverty Committee in October 2025 and includes our ten
newly approved equalities outcomes. The strategy now clearly outlines the strong
thread that runs between our equality outcomes and our ambitions under the
Programme of Work and The Plan for North Lanarkshire and details the many
improvements we have made in our equalities outcomes over the last few years.
• Much of this has been achieved as a result of the clear governance and
engagement approach now being taken with this work across the Council,
including the establishment of our Equalities Board and Equality Outcomes
Performance Management Framework, which has enabled a much stronger focus
on driving improved outcomes. There has also been good support and ownership
of this work across our services with all having established a clear equality plan
through their equality champions, and many actions now reflected in recent service
workforce plans.
Planned Service Actions - Highlights 
2.29 Highlights of relevant planned service actions aligned to equality & inclusion are set
out in the table below.
Page 44 of 216

Page 45

Service Directorate Workforce Actions
Chief Executives • Finance & Technology notes that approximately 2.5%
of employees are from a Black, Asian, and Minority
Ethnic (BAME) background and sets out an intention
to encourage under-represented groups to apply for
posts when advertising externally.
• Legal & Democratic note a significant diversity
imbalance, with women comprising the vast majority
of staff and occupying 81% of managerial roles, and
most of the service being white. The service outlines
that proactive steps are needed to address gender
imbalance and strengthen diversity within the service.
• Strategic Engagement will increase EQIA training
uptake across teams.
• Audit & Risk acknowledges the lack of ethnic diversity
in its small team and signals the need for targeted
action.
Enterprise &
Communities
• Place reports progress in increasing the proportion of
staff from minority ethnic backgrounds (from 2% in
2023 to 5% in 2025).
• ACC report that their workforce profile is
representative of their communities with a 2% BAME
representation and a significantly younger workforce
than seen elsewhere in the Council with an average
age of 41.
• Within FSS, 1.37% of the workforce are people from
a black or minority ethnic group. This compared to
just over 1% in April 2023.
• Roads & Assets intend to highlight family friendly
policies including smarter working and worklife
balance opportunities to try to attract more female
candidates and address their largely male workforce
profile.
• Asset & Procurement reports that females are
typically underrepresented in asset and procurement
professional roles at a national level; however the
service has recruited several females across all
areas. The service also reports that 3.2% of the
workforce identify from BAME communities which is
slightly higher  than the  North Lanarkshire
demographic.
Adult Health & Social
Care
• Adult Health & Social Care note that because of
focused work on their equalities profile, their diversity
now better reflects the demographics of the wider
North Lanarkshire population. This includes that the
proportion of individuals identifying as being from
Black, Asian, and Minority Ethnic (BAME)
backgrounds has shown a positive increase over
recent years, rising from 0.57% in 2023 to 1.4% in
2025.
Page 45 of 216

Page 46

Education & Families • Education & Families highlights the need to support
the older social-work workforce, where the average
retirement age has dropped to 55.
• The service also notes a lack of males in E&F front
line roles and are considering a targeted promotion
and marketing of these roles, including within the MA
programme.
• Education & Families also plan to undertake an
accurate assessment of BAME representation in the
teaching workforce and take appropriate action and
will be represented on the Scottish Government’s
newly established Diversity in the Teaching
Profession and Education Workforce Group. 
Workforce Dashboard 
2.30 The council’s revised workforce dashboard is included in appendix 2 and now provides
elected members with a broader range of information regarding our workforce including
information relating to our temporary workforce, recruitment, case management and
absence. This will be revised and updated on an annual basis to support the One
Workforce Plan. 
3. Measures of success
3.1 Progress against priorities and actions identified within the One Workforce Plan and
associated rolling delivery plan.
3.3 Continued strong workforce planning and associated delivery of actions to manage and
mitigate ongoing risks and close identified gaps in our current workforce.
3.4 Positive ongoing survey feedback from staff regarding their engagement in the overall
programme of work and as the council transitions its operating model in the coming
years. 
4. Supporting documentation
4.1 Appendix 1 – One Workforce Delivery Framework
4.2 Appendix 2 – Workforce Dashboard 
Fiona Whittaker
Chief Officer (People Resources) 
Page 46 of 216

Page 47

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts been discussed and agreed with Finance?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☒ No ☐
If Yes, have all relevant HR impacts been discussed and agreed with People Resources?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
All policy impacts have been taken forward with full input from People Resources and
trade unions.
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☒ No ☐
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Yes ☒ No ☐
The report sets out a number of changes which may impact the Council’s workforce
arrangements over the next 12 months, and these will be fully managed in line with the
plan and the councils managing workforce change policy.
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal data?
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed to
dataprotection@northlan.gov.uk
Yes ☐ No ☐
Page 47 of 216

Page 48

5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)?
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed?
Workforce risks have been fully captured in the Corporate HR risk and are also reflected in
service risk registers.
5.10 Armed Forces Covenant Duty
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does it
relate to healthcare, housing, or education services for in-Service or ex-Service personnel,
or their families, or widow(er)s)?
Yes ☐ No ☒
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services.
5.11 Children’s rights and wellbeing impact
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact and the provision that has been made
to ensure there has been appropriate consideration of the relevant Articles from the United
Nations Convention on the Rights of the Child (UNCRC).
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out?
Yes ☐ No ☐
Page 48 of 216

Page 49

Appendix 1 
One Workforce Delivery Plan
2024/25 Progress Update & 2025/26 Plan 
1
Last updated 19/10/25
Page 49 of 216

Page 50

1. One Workforce Strategic Priorities to 2028 
2
Last updated 19/10/25
Page 50 of 216

Page 51

2. Progress Update on Delivery Plan 
Key: In progress, on track Requires further action. Complete # New for 2025/26 
Managing Workforce Transition
Action Description Lead Officer RAG Comments
1.1 Support the delivery of ongoing
workforce and structure
changes arising from service
redesign and savings exercises.
Effective HR support for the delivery
of workforce changes linked to agreed
future savings and service
realignments linked to our future
operating model and One Service
programme of work.
HR Business
Partnership Manager 
The progression of agreed budget workforce
related changes linked to three-year savings are
complete across all services, and in line with
agreed workforce change policies. 
Agreed service reviews with workforce
implications have also been fully progressed and
were successfully concluded during 2025.
1.2 Continue with organisation and
workforce mapping to identify
transition plans for future
workforce models and
structures as these evolve over
the next 3-5 years.
An ongoing process of mapping and
improving our service models and
structures, including digital
transformation and where and how
staff will work to deliver our services
as we evolve to a hub-based
community delivery model.
HR Business
Partnership
Manager/Operating
Model delivery
Manager 
As part of our bi-yearly workforce planning
cycle, a revised approach to service operating
model planning was incorporated within an
improved workforce planning process launched
in March 2025. This included further
enhancements around workforce capacity
planning and service alignment to our future
operating model.
1.3 Complete a full review of the
Council’s single status pay and
grading model and implement
approved changes.
Successive differentiated pay awards
have resulted in significant
compression of the Council’s single
status pay and grading model, which
is now required to undergo a full
Employment and
Policy Manager 
A Project Board has been established to lead
the overall review, and phase one of the work is
underway. This includes the completion of a
refreshed EQIA analysis of the model by the
Independent Technical Adviser which was
completed in early September 2025. An update
3
Last updated 19/10/25
Page 51 of 216

Page 52

review of all grades, to be undertaken
over several years.  
paper on progress with this work and the final
plan for phase one will be brought to Finance
and Resources Committee in Cycle 1 of 2026.
1.4 # New work for 2025/26.
Progress actions from our
revised 25/26 Service
Workforce Plans.
A robust ongoing process for
workforce planning across all services
to manage known workforce risks and
build a resilient future workforce.
Detailed actions must be in place to
support plans with a focus on the
progression of actions.
Talent & Leadership
Development
Manager/Business
Partnership Manager 
Updated biannual workforce plans for all
services are now complete, and a summary
analysis of the key challenges and themes is
included within the One Workforce report. The
progression key identified actions will be
overseen throughout the year by the One
Service Board. 
Pathways for Progression
Actions Description Lead Officer RAG
Status
Comments
2.1 Maintain our leadership and
learning and development
offering for all staff within
budget constraints.
Investment in developing the skills
required for realising our future
operating model within the funding
available maintaining where possible
our leadership and learning and
development offering through Learn
NL.
Talent & Leadership
Development
Manager 
Leadership development is well established at
middle and lower levels, with two successful
programmes now fully embedded into our
curriculum. A Transformational Leadership
Programme for third and fourth tier officers was
approved in October by CMT and is now in
development, with the first cohort launching in
January 2026.
2.2 Maintain and extend our
Graduate Apprenticeship
Scheme.
The Council’s graduate apprenticeship
scheme has been running successfully
since 2018 with increasing numbers
of staff in progress or having
completed their qualification. The
operation of the scheme will be
critical going forward to help address
Talent & Leadership
Development
Manager 
The UWS Urban Planning Work based learning
degree fully launched in Feb 2025 with 3 staff
now engaged through the programme.
The now fully approved Social Work GA will be
available from September 2025 with 6 staff on
the first cohort. Work underway with UWS to
develop a work-based learning degree for
4
Last updated 19/10/25
Page 52 of 216

Page 53

identified shortages in key
professional and specialist areas
including planning, social work and
regulatory services.  
Environment Health. We are also looking to
establish a qualification pathway for a trainee
Clerks of Works.
2.3 Complete a review of our higher
duties policy arrangements
The Council’s higher duties guidance
supports employees to take on new
and promoted remits on a temporary
basis. This now needs to be reviewed
to support and align with our
programme of work and to more
easily enable staff to take on
development opportunities and
contribute to projects and
programmes.
Business Partnership
Manager/
Employment & Policy
Manager 
A full review of our higher duties guidance has
been completed, and was approved by Finance
and Resources Committee in May 2025. This
includes new guidance on salary placing to
assist with the recruitment of difficult to fill
posts. The guidance has been fully rolled out
with additional support for managers.
2.4 Incorporate the SCQF (Scottish
Qualifications & Credit
Framework) qualifications into
our job grading and recruitment
processes to become an
inclusive recruiter.
Incorporation of the SCQF framework
will allow the Council to become an
inclusive recruiter, providing us with
the ability to undertake qualifications
equivalency and recognise relevant
experience where people fail to meet
the required qualification on the
essential criteria.
ESC Manager  We continue to progress our journey to become
an inclusive recruiter and it is thought that this
work will take a number of years to complete as
we work through key services areas where this
approach will be advantageous in attracting a
wider field of potential candidates.
2.5 Improve the speed and
effectiveness of our recruitment
processes.
Work is required to improve the
speed and effectiveness of our
recruitment processes to ensure that
we are not disadvantaged in the
recruitment market. This includes
more targeted and appropriate
recruitment processes which reflect
the nature of the jobs being
advertised.
Business Partnership
Manager/ESC
Manager/Employme
nt & Policy Manager 
Work to implement an improved approach to
recruitment across the Council has been further
progressed with improvements in several areas
including:
• The completion of work to fully link iTrent
recruitment to the MyJobScotland system to
allow for automatic posting of jobs and
remove double keying between two systems. 
5
Last updated 19/10/25
Page 53 of 216

Page 54

• The development of three new application
forms and candidate packs which better align
to the types of post being advertised
including a simplified form for entry level
jobs.
• An improved stand-alone recruitment policy,
with supporting guidance and training for
managers.
• Improved shortlisting processes which better
align to the newly revised application forms
and accompanying processes.
This work is expected to be completed in early
2026 with a paper brought to Finance and
Resources for approval of the changes and the
revised policy.
2.6 Maintain our engagement with
Employability and Routes to
Work to fill vacant and hard to
fill roles at entry level.
The Council continues to work
successfully with Routes to Work to
offer job seeking residents the
opportunity to gain work in entry
level roles within the Council. In a
number of areas this has resulted in
permanent roles being offered with
onward promotion prospects.
ESC Manager  North Lanarkshire Council continues to
strengthen its partnership with Routes to Work
and the Working for Families Team. We have
taken forward 2 cohorts of ringfenced
recruitment in 2025. with the appointment of
- 8 Catering Assistants
- 4 Cleaners
- 1 Facility Assistant
- 4 Support Assistants in the Employee
Service Centre
- 2 Streetscene Operatives
- Interviews taking place throughout October
in Land & Waste for more opportunities.
Additionally previous candidates have seen
progression in promoted posts.
6
Last updated 19/10/25
Page 54 of 216

Page 55

Next Generation Council Workforce
Actions Description Lead Officer RAG
Status
Comments
3.1 Continue with our
Modern Apprentice
programme to support
service workforce plans.
The Council has continued to extend and
grow its modern apprenticeship programme
particularly to support known and ongoing
workforce gaps across our services.
Talent & Leadership
Development
Manager/Business
Partnership
Manager 
The Council’s Modern Apprenticeship
programme continues to grow with offerings for
new pathways for young people. Following an
extensive recruitment campaign, 56 MA’s were
recruited in 2025, filling our full contract with
just the summer recruitment. New MA
programmes include a shared MA programme
with NHS Lanarkshire and Health and Social
Care MAs within our Home Support Teams.
3.2 Extend our annual work
placements scheme for
senior phase pupils and
school leavers to align to
workforce plans and
gaps.
Our 2023 summer placement scheme has
been very successful with around 30 senior
phase and school leaver pupils taking up a
six-week placement across a range of
services. 
In 2025 we have grown this to just under 200
placements participating in a seven week
placement in both the Council and our
external partners
Talent & Leadership
Development
Manager/Business
Partnership
Manager/Brighter
Futures Manager 
Our Summer Placement Programme continued
to grow in 2025 with 191 young people
successfully placed in a variety of disciplines
both within the Council and our external
partners. Notably all 191 placements
completed the programme.
As part of our drive to continuously improve
and develop the programme, this year we
introduced an employability award to
complement the experience gained by the
young people. Of the 191 students on the
programme, 177 completed the award. 
Work is now underway to prepare for 2026 with
a request to extend the delivery team to
develop the programme into a fully sustainable
model for the future.
7
Last updated 19/10/25
Page 55 of 216

Page 56

3.3 Explore the use of
Foundation
Apprenticeships for key
areas of the Council
workforce where there
are known shortages and
to build pathways direct
from school.
The Council does not currently offer
Foundation Apprenticeships within our
own services, and we will continue to work
to identify relevant frameworks which can
be linked to areas of known shortage.
Talent & Leadership
Development
Manager/Brighter
Futures Manager 
Work continues to explore how the Council
could make use of existing foundation
apprenticeships, and we will further explore
how these can be adapted to join up with our
summer placement scheme.
3.4 # New work for
2025/26.
Develop a formal
graduate intern
programme for the
Council to build a
pipeline of future
managers and leaders.
Succession planning issues for middle and
senior manager roles have been
highlighted across a high number of service
workforce plans, and work is planned for
early 2026 to investigate the feasibility of a
graduate intern programme which would
attract recently graduates or those in their
final year to undertake a paid work
placement with the Council.
Talent & Leadership
Development
Manager. 
Work on this initiative is underway and will be
further developed in early 2026.
Vibrant & Flexible Workplace
Actions Description Lead Officer RAG
Status
Comments
4.1 Implement the Council’s
final Hybrid Working
Scheme.
Implement and monitor the full
implementation of our final Hybrid
Working Scheme which impacts around
1300 previously office-based staff.
Employment & Policy
Manager
Manager/Business
Partnership Manager 
Our revised scheme is now fully agreed and in
place. A full Hybrid Working Survey has been
completed and the results are included in the
One Workforce update report.
4.2 Develop our community-
based workplace settings,
promoting and tracking
staff usage of our
We will continue to support the further
development of our community-based
workplace offering aligned to our
leadership and operating model and under
our One Service programme of work.
Business Partnership
Manager/Operating
Model delivery
Manager 
Significant work continues to be undertaken
to develop and improve our community
based workplace spaces to better support
our staff and align with our future operating
model. A full outline of this is included
8
Last updated 19/10/25
Page 56 of 216

Page 57

community hubs as these
develop and expand.   
within the Leadership & Operating Model
progress update report which will be
presented at Policy & Strategy in December
2025.
Employee Engagement & Wellbeing
Actions Description Lead Officer RAG
Status
Comments
5.1 Build from our current IIP
staff engagement
approach by developing a
broader staff survey
strategy which supports
our programme of work
and engages staff at all
levels.
The Council needs to establish a broader
staff survey approach which allows us to
engage staff at all levels in our programme
of work and our future ambition and
operating model. This will be taken
forward linked to the One Service
programme of work and aligned to the
Councils wider commitments under fair
work.
Talent & Leadership
Development
Manager 
The full pilot of the new survey has now been
completed, and a summary of the outcomes is
set out within the December One Workforce
update to Policy & Strategy Committee.
Following the success of the pilot, a plan will
be developed in early 2026 to support the
wider roll out of the survey across the Council.
5.2 Continue with our
current programme of
work designed to provide
staff with support for
mental health &
wellbeing and reduce
levels of mental health
related absence.
Our levels of mental health related
absence have materially reduced in recent
years through targeted action and support;
however, this area remains our most
significant reason for absence overall.
Good progress has been made on the
development and implementation of our
wider mental health strategy with service-
based groups now established across all
services.
Occupational Safety
& Wellbeing
Manager/Employme
nt & Policy Manager 
Council Mental Health groups continue to
meet and develop ideas and strategies which
assist with staff mental health and wellbeing
in their service. Additionally, the Policy &
Employment team are undertaking direct
work to support services who have high rates
of mental health absence including some of
our larger frontline services.
5.3 Maintain and extend
where appropriate our
successful range of staff
benefits and supports
We continue to get good engagement with
our staff benefits under our Workwell NL
platform which includes staff discounts and
a range of salary sacrifice schemes.
Employee Service
Centre Manager 
Our Green Car scheme continues to prove
popular and in addition we will be reviewing
our overall provision of benefits under our
Workwell NL banner during 2026. In addition,
9
Last updated 19/10/25
Page 57 of 216

Page 58

through our Workwell NL
offerings.   
we have added specific questions within our
new survey that ask staff about what benefits
they would see as most advantageous within
our offering. Responses have already
signalled several areas for us to incorporate in
our review of benefits next year.
5.4 Undertake a joint review
of our current trade
union consultation and
collective agreement
arrangements.
The scope of the review will include facility
time, the constitution and operation of the
JCC and other linked service based
consultation arrangements. The work will
be taken forward in partnership with
Unison, GMB and Unite colleagues.
Employment &
Policy Manager 
Discussions have been fully progressed with
full time branch officials and local
representatives from Unison, Unite and GMB
around the joint review of the council’s
recognition agreement including
arrangements for consultation and collective
bargaining. We expect to conclude this work
in early 2026 and will bring a paper to Finance
and Resources to fully agree the revised
arrangements.
Equality & Inclusion
Actions Description Lead Officer RAG
Status
Comments
6.1 To implement our integrated
Equalities Delivery Plan which now
includes all strands of our work
under one plan.
Our Equalities Delivery Plan and
associated framework of
measures will ensure the
progression of all of our Equalities
programmes including our
commitments under the Race at
Work Charter, Equally Safe at
Work and Disability Confident
Leader.
Equalities Manager  A full review and refresh of our Equalities
Outcomes is now complete and was approved
by Wellbeing and Tackling Poverty Committee
in April 2025. 
A performance framework to support our new
equalities outcomes has now been developed
and shared with Programme of Work Boards
to enable them to develop their revised
equalities plans for 2026 and beyond.
10
Last updated 19/10/25
Page 58 of 216

Page 59

6.2 To continue to support the work of
our Equalities Board.
Our Equalities Board was
established in early 2023 and has
representation from all services
across the Council. The work of
the Board involves oversight of
the plan, and more importantly,
establishing and driving service
level equalities plans in each of
our services and the sharing best
practice.
Equalities Manager  A full refresh of our Equalities Strategy was
undertaken in the second half of 2025 under
the guidance of the Equalities Board. The
refreshed strategy also includes equalities
information for North Lanarkshire drawn from
the 2022 census data and was approved by
Wellbeing and Tackling Poverty Committee on
10th October 2025. The Equalities Board will
consider and drive the outcomes from the
strategy both corporately and within services,
with update provided through the Council’s
Wellbeing & Tackling Poverty Committee.
6.3 To ensure going forward that our
HR policies and relevant and
inclusive and that they support
our equalities outcomes.
Our HR policies are critical to
supporting our equalities plan and
desired outcomes and will be kept
under review to ensure that they
are aligned. Where required new
policies will be developed to
support our delivery plan.
Equalities
Manager/
Employment &
Policy Manager 
During 2025 we have launched two new
equality & diversity policies which support the
delivery of our equalities outcomes including
our Sexual Harassment Policy, and our Disability
Policy which were both approved by Finance
and Resources Committee in May 2025. 
11
Last updated 19/10/25
Page 59 of 216

Page 60

Power BI Desktop 
Workforce Dashboard 2025
Appendix 2 
Page 60 of 216

Page 61

Power BI Desktop
Permanent Temporary Supply 
Workforce FTE Workforce FTE Workforce Headcount 
Pay bill
Change on Previous year Change on Previous year Change on Previous year
Pay bill Pay bill
Based solely on Contractual Payments Based solely on Contractual Payments Based on Casual Elements paid 
FTE 12-month trend
12.0K 
11.5K
FTE 12-month trend 
1,600 
1,400
FTE 12-month trend
2.2K 
2.0K 
Core Workforce in year ending 31st March 2025
North Lanarkshire Council Workforce Dashboard
11.65K + 0.20K 1.44K 0.16K 2.01K 0.04K
£456.09M +£39.78M £45.36M £8.94M £10.35M +£1.38M
Page 61 of 216

Page 62

Power BI Desktop 
New Starts in last 12 months 
All values on this page relate to
non-Teaching roles 
1,000 
500 
0
New Starts by Type
1,086 
Permanent Temporary Supply
Top Ten Roles
Early Learning & Childcare 239
Clerical/Admin 117
Cleaner 106
Catering 94
Casual - Sports Coaches 87
ASNA 81
Casual - Leisure Venues 80
Home Support 73
As some employees hold multiple contracts with more that one
'Type' bar chart total differs from count of People.
Casual - Invigilator 58
Casual - Bar staff/Front of House 42 
12-month trend 
300 
200 
100 
Enterprise & Communities
Education & Families
Adult Health & Social Care
Chief Executive's Office 
New Starts by Service 
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar 0 200 400 600
2024 2024 2024 2024 2024 2024 2024 2024 2024 2025 2025 2025    
As some employees hold multiple contracts in more that one Service bar chart total differs from count of People.
New Starts in year ending 31st March 2025
North Lanarkshire Council Workforce Dashboard
457
320
730
653
223
213
Role New Starts 
Page 62 of 216

Page 63

Power BI Desktop  
Sex Ethnicity Disability 
545
(30.01%) 
1271
(69.99%) 
Female 
Male 
Asian or Asian British 
Black or Black British 
Mixed
%)  Not Stated 
Other Ethnic Groups 
White  89 (4.9%) 
No 
Undisclosed 
Yes 
<18
18-25
Age at Joining Average age at joining 
438 (23.29%)
Part-time working 
475 (25.25%) 
Full time 
Part time 
Supply 
968 (51.46%) 
All values on this page relate to
non-Teaching roles
New Starts in year ending 31st March 2025 - Profile
North Lanarkshire Council Workforce Dashboard
32 (1.76%)
384
(21.15%)
28
(1.54
1356 (74.67%)
1326 (73.02%)
401 (22.08%)
269
557 
26-29       215
30-39       452
40-49       317
50-59       180
60+       125  Page 63 of 216

Page 64

Power BI Desktop 
4040
(24.34%) 
12561
(75.66%)
Sex 
Female 
Male 
13224 (79.66%)
Ethnicity
128 (0.77%)
2896 (17.44%) 
297
(1.79%) 
Asian or Asian British 
Black or Black British 
Mixed 
Not Stated 
Other Ethnic Groups 
White 
7028
(42.34%) 
630 (3.8%)
Disability 
8941
(53.86%) 
No 
Undisclosed 
Yes 
Age Average Age at 31st March  
1774 (10.25%) 
7140
(41.27%)
Part-time working 
8387
(48.48%) 
Full Time 
Part Time 
Supply
All values on this page relate to
Teaching and non-Teaching roles
Core Workforce at 31st March 2025 - Profile
North Lanarkshire Council Workforce Dashboard
60 +     2523  
50-59     4385   
40-49     3806   
30-39     3358   
26-29     1214   
18-25     1218   
<18     97   
Page 64 of 216

Page 65

Power BI Desktop  
£10.35M 
Workforce FTE Pay bill 
Change on Previous year 
FTE = total number of hours utilised during the year by Supply employees
divided by 1825, the annual hours worked by a 35 hr per week contract 
Trend during Year 
£1.5M 
£1.0M 
£0.5M
Change on Previous year 
Top Ten Roles 
Role FY Total Cost

Supply Teacher - Secondary £2,527,477.57
Supply Teacher - Primary £2,218,757.45
Casual - Leisure Venues £1,656,282.09
Casual - Home Support £1,419,923.61
Casual - Sports Coaches £658,634.41 
Supply Teacher - ASN £325,141.70 
Casual - Catering £217,374.37 
Supply - Social Worker £174,558.83 
Casual - Creative /Arts £159,464.18 
Casual - Bar staff/Front of House £150,468.63 
Apr
2024
May
2024
Jun
2024
Jul
2024
Aug
2024
Sep
2024
Oct
2024
Nov
2024
Dec
2024
Jan
2025
Feb
2025
Mar
2025  All values on this page are based on Casual/Supply
Elements paid to 'Supply' employees
Supply Workers in year ending 31st March 2025
North Lanarkshire Council Workforce Dashboard
Page 65 of 216

Page 66

Power BI Desktop
Open Cases Resolved Cases 
Cases at end of quarter
10 (15.87%) 
53
(84.13%) 
Disciplinary  Grievance  Collective Grievence 
Temporary Measures
Cases at end of current quarter
12
(34.29%) 
1 (2.86%)
22 (62.86%) 
Disciplinary  Grievance  Collective Grievance 
Time to Resolve - discipline 
Management Meeting
Written Warning
No action
Final Written Warning
Resigned
Did not progress
Dismissed
Verbal warning
Outcomes in current quarter 
18%
12%
6%
2%
2%
2% 
Time to Resolve - grievance 
26% 
32%
1 (4.55%)
6 (27.27%)
1 (4.55%) 5 (22.73%) 
5
(33.33%) 
15 (68.18%) 
Suspensions  Temporary move  Alternative duties
16 (72.73%) 
0 to 3 months  3 to 6 months  7 to 12 months  0 to 1 month  2 to 3 months  4 to 12 months
Managing Workforce Transition – Case Management Quarter 1 2025
North Lanarkshire Council Workforce Dashboard
1 (6.67%)
9 (60%)
Page 66 of 216

Page 67

Power BI Desktop 
5
2
1
2
10
2
Status 
Active Redeployees 
Leavers 
Removed from Redeployment 
Successful Redeployees
Redeployment 2021 - 2025 
2021 2022 2023 2024 2025
Length of Time in Redeployment (Active Cases) 
2021-2023 2024 2025
Band 0-6 months  12-18 months  18 month+  6-12 months 
3 (13.6
Existing Redeployment by Service 
10 (45.45%) 
Service 
Education & Families 
Enterprise & Communities 
Not Recorded 
A&CC 
A&CC/E&F 
Chief Executive's Office 
Adult Health & Social Care
Managing Workforce Transition – Redeployment
North Lanarkshire Council Workforce Dashboard
4
2
3
2
NLC11 NLC7 CNL6 NLC2 NLC3 NLC5
4 1 1
NLC4 4
NLC12
4 2
NLC6
1
NLC6/NLL4
1
1 1
NLC9 TCH5
1 1
1 (4.55%)
1 (4.55%)
4%)
6 (27.27%)
25 24
7 
11
5
7
5
7
12
5
Page 67 of 216

Page 68

Power BI Desktop 
No of Absences
13.16K 13.09K
FTE Days Lost
103.91K 105.1K
FTE Days Lost %
67% 68%
Total FTE Days Lost
154.24K 154.83K 
3.6K  3.52K
50.33K 49.73K 33% 32% 
23/24 24/25 
Long Term  Short Term
23/24 24/25 
Long Term  Short Term
23/24 24/25 
Long Term  Short Term  23/24 24/25 
Top 5 Reasons - Long term Top 5 Reasons - Short term 
Anxiety/Stress/Depre…
Bone/Muscle/Joint
Post Operative
Abdominal & Gastric
Respiratory Non Cold… 
5K
6K
5K
5K
4K
4K 
23/24  24/25 
21K
21K
40K
42K Anxiety/Stress/Depre…
Bone/Muscle/Joint
Abdominal & Gastric 
Cold & Flu
Coronavirus  4.6K 
23/24  24/25 
6.8K
7.2K
6.4K
6.9K 
6.0K
10.3K
10.5K
Employee Engagement & Wellbeing – Absence Rates
North Lanarkshire Council Workforce Dashboard
5.1K
1.6K
Page 68 of 216

Page 69

Power BI Desktop
25K 
Council 11.84 11.86 10.99
11.3K 12.0K
FTE Days Lost All Absences
8.7K 
Single Status - All 12.92 13.28 12.49
Adult Health & Social Care 15.76 16.65 
Chief Executives 7.47 7.57 
Education & Families (Single Status) 13.13 12.76 
4.7K  5.0K 
1.3K  1.2K
Education & Families (Teaching) 8.86 8.16 7.08
Enterprise & Communities 12.84 13.51
Education &
Families
Enterprise &
Communities
Adult Health &
Social Care
Chief Executive's
Office 
23/24  24/25
49K
FTE Days Lost Long Term
28K
FTE Days Lost Short Term
36K
21K 23K 
4K 4K 
12K 
15K 
7K 7K 
2K 3K 
Education &
Families
Enterprise &
Communities
Adult Health &
Social Care
Chief Executive's
Office
Education &
Families
Enterprise &
Communities
Adult Health &
Social Care
Chief Executive's
Office
23/24  24/25  23/24  24/25 
Employee Engagement & Wellbeing – Absence Rates and Trends by Service
North Lanarkshire Council Workforce Dashboard
Service/Group FTE Days Lost  FTE Days Lost Target
Per E'ee - 23/24 Per E'ee - 24/25 
7.1K
42K
30K
Page 69 of 216

Page 70

Power BI Desktop
14.85%
15.34%
5.18%
4.83%
5.48%
3.91%
2.56% 4.86% 
24.86% 
19.13%
13.09%
2.36%
13.74%
13.74%
13.09%
26.59% 
35.85% 
9.58%
10.73%
3.31%
4.42%
1.86% 4.14%
3.51% 
No of Employees Sick >3 Months FTE Days Lost Sick >3 Months
132 130 
101  120 
55 56
4 5 
1.7K 1.9K
1.6K
1.2K 
0.7K  0.7K 
0.1K  0.1K 
Education & Enterprise & Adult Health & Chief Executive's Education & Enterprise & Adult Health & Chief Executive's
Families Communities Social Care Office Families Communities Social Care Office
23/24  24/25  23/24  24/25 
AH&SC Top 5 >3 Month Chief Exec's Top 5 >3 Months Ed & Fam Top 5 >3 Months 
23/24  24/25  23/24  24/25  23/24  24/25
Employee Engagement & Wellbeing – Ongoing Longterm Absences at 31st March
North Lanarkshire Council Workforce Dashboard 
23/24 24/25 
21.68% 
21.32% 
13.35% 
20.66% 
14.06% 16.93%
5.79% 7.87%
2.84%
10.09%
3.49% 4.92%
Page 70 of 216

Page 71

Power BI Desktop
72 
All values on this page relate Recruitment
in the period April to June 2025
Average days to  Average days to
recruit (Internal) recruit (External) 
Number by Adverts 
Average Days - Interview
to Appointment 
Average Days - Offer
Accepted to Appointed
Appointment Type (%) 
Total adverts
posted in
quarter 
Total adverts
- With
applicants
45.73 24.72 
Appointment Type 
External 
Internal
Average Days Interview to Progress to Offer 11.03
Average Days Progress to Offer to Awaiting Offer Information 1.46 
Average Days Awaiting Offer Information to Offer 2.92  82
Average Days Progress to offer to Offer Accepted 11.43  
Average Days Offer Accepted to Appointed 24.72  
Progress to offer to offer accepted Days  
External candidates - average days from progress to offer to offer accepted 10.53
Internal candidates - average days from progress to offer to offer accepted 15.94
Pathways for Progression – Recruitment Process Quarter 1 2025
North Lanarkshire Council Workforce Dashboard
Offers Days
34.92%
65.08%
391
436
Page 71 of 216

Page 72

Power BI Desktop 
Leavers in last 12
months 
1105
Average age at leaving   
15.
Leavers by Reason 
33.67% 
Group
Resignation
End of Contract
Retiral
Voluntary Redundancy
Involuntary Termination
Death in Service
Top 10 roles 
337 
180 
Service Length at Leaving
Permanent Temporary Supply
As some employees hold multiple contracts with more that one
'Type' bar chart total differs from count of People.
12-month trend
400 
780
(48.72%) 
269 (16.8%) 
136
(8.4…)
LOS
less than 6 months
6 to 12 months
One to five years
More than 5 years 
Exit Interview Complete
(Resignation Only) 
200 
335 
200 
0
Apr
2024 
May
2024 
Jun
2024 
Jul
2024 
Aug
2024 
Sep
2024 
Oct
2024 
Nov
2024 
Dec
2024 
Jan
2025 
Feb
2025 
Mar
2025
416
(25.98%)  No  Yes
Pathways for Progression – Leavers in year ending 31st March
North Lanarkshire Council Workforce Dashboard
1,593
8.34% 1.25%
55%
19%
22.19%
All values on this page relate to
non-Teaching roles
Role Leavers 

Early Learning & Childcare 276
Home Support 119
Clerical/Admin 107
ASNA 93
Cleaner 71
Catering 60
Casual - Leisure Venues 58
Casual - Sports Coaches 48
Casual - Invigilator 38
Casual - Bar staff/Front of House 6 
Page 72 of 216

Page 73

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref     SL/TMcB/BL Date 04/12/25 
Digital Connectivity Masterplan for Council Housing Tenants
Update 
From  Stephen Llewellyn, Chief Officer (Housing) 
E-mail Llewellyns@northlan.gov.uk Telephone  07939280680 
Executive Summary 
The purpose of this report is to update on the long-term integrated plan to provide digital
connectivity for council housing tenants, thereby creating the foundations for
transformational change though facilitating the introduction of enabling technologies and
solutions across multiple aspects of modern life. 
The report outlines the wide-ranging benefits of enabling digital connectivity for council
housing tenants providing endless possibilities to radically transform the way in which the
council delivers supports and services, empowering tenants with increased choice and
control over their interactions with services, enabling faster access to services and
improving customer experience. 
The report seeks approval for a tender exercise to procure for a supplier on the provision
of customer broadband for all council housing tenants. 
Approval is also sought in this report on providing a test of change initiative to inform a
digital connectivity masterplan for all council housing tenants as part of a 5–7-year
implementation plan, reduced from an estimated project lifespan of 10-15 years. The test
of change initiative through the provision of digitally enabled homes is intended to
overcome exclusion by addressing the barriers to opportunity, access, knowledge and
skills for using technology and reducing inequalities. The Digital Connectivity Masterplan
aligns with vision of The Plan on improving lives in North Lanarkshire. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Approve the tender exercise for the provision of broadband for all council housing
tenants.
(2) Approve the proposed test of change on digital connectivity, which will deliver
digitally enabled homes across North Lanarkshire, aiming to transform lives by
improving safety, wellbeing, and independence through smart technology. As part of
this initiative, nearly 400 of the 2000 selected properties will form a focused pilot for
tech-enabled homes. These pilot sites will be equipped with smart home
Item 4
Page 73 of 216

Page 74

1. Background 
1.1 Digital North Lanarkshire is one of the seven priorities within the Programme of Work
for 2023 to 2028. The vision for Digital North Lanarkshire is to improve the lives of
people and communities of North Lanarkshire with investment targeted in digital and
technological solutions, which aims to help realise inclusive growth and prosperity for
all, aligned with the council’s ambition set out in The Plan for North Lanarkshire. 
1.2 Committee will be aware of the Digital and IT Strategy for 2024 to 2027 that was
approved by the Policy and Strategy Committee in March 2024, providing the strategic
direction to deliver a Digital North Lanarkshire recognising that technology achieves a
multitude of far-reaching benefits for the people and communities of North Lanarkshire. 
1.3 Committee will also recall that in March 2025, the Policy and Strategy Committee
approved the exploration of a test of change feasibility on digital connectivity for council
housing tenants, recognising the potential for transformational change and benefits
realisation, which would be subject to a future committee report. 
1.4 The aims of digital connectivity to tenants are to address digital poverty of low-income
households by providing a full internet service which is affordable, superfast, secure,
and reliable providing exceptional quality connectivity to all council tenants. Specifically,
providing: 
• All council housing tenants benefit from high-speed premium internet access at 1
Gigabit per second, surpassing the UK Government’s connectivity target.
• A service which can support the connectivity needs for the next 20+ years. 
• Option to replace landline. 
• A guaranteed price. 
• A secure service with ability to control content filtering. 
• Easy-to-use in property connectivity with the council systems and devices, enabling
complete integration with service delivery and backend processes. 
• Support for a seamless service between pupils learning at home and in the
classroom.
• The infrastructure to support rapid deployment of the IoT (Internet of Things) and
smart solutions e.g., telemedicine and healthcare. 
2. Report 
Benefits of Digital Connectivity 
technologies tailored to tenant needs, enabling early evaluation of digital solutions in
real-world settings. The pilot will generate valuable insights into how digital tools can
support tenants and inform future scaling across the wider housing stock. Outcomes
and learning from the pilot will be reported to a future committee. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work All Programmes of Work
Page 74 of 216

Page 75

2.1 The Scottish Household Survey (SHS)1 estimates that 10% of households in North
Lanarkshire do not have internet access and furthermore, 15% of social rented tenants
are the least likely across all tenures.2 The survey shows that there is a correlation
between digital exclusion and areas of deprivation, with households in the most
deprived areas experiencing a greater rate of digital exclusion than those in less
deprived areas. 
Housing Benefits 
2.2 Smart housing technologies improve safety with real-time alerts from locks and alarms,
boost energy efficiency through sensors and thermostats, and prevent costly repairs by
detecting damp or mould early. Automated systems streamline security operations,
while IoT analytics support better housing decisions. Digital access also enables
tenants to manage benefits online, reducing barriers to essential services.
• Improved Safety & Security: Smart locks and alarms provide real-time alerts and
monitoring.
• Energy Efficiency: Smart sensors and thermostats reduce energy consumption,
lower bills, and tackle fuel poverty.
• Proactive Maintenance: Early detection of damp/mould prevents costly repairs and
improves tenant health.
• Operational Efficiency: Automated control of sprinklers, CCTV, and security doors.
• Enhanced Data Management: IoT and analytics enable better decision-making on
housing conditions.
• Digital Access for Benefits: Ensures tenants can apply for Universal Credit and
housing costs online.
Education & Employability Benefits
2.3 Access to online platforms supports continuous learning and workforce development,
while remote learning and flexible work opportunities remove geographic barriers.
Collaboration tools enhance student–teacher interaction, and online courses help
improve employability. Additionally, digital platforms guide school leavers toward
positive destinations, ensuring better educational and career outcomes.
• Access to Learning Resources: Online platforms support continuous learning and
workforce development.
• Remote Learning & Work: Flexible education and job opportunities beyond
geographic limits.
• Collaboration Tools: Enhance student-teacher interaction.
• Skills Development: Online courses improve employability.
• Support for School Leavers: Digital platforms guide positive destinations. 
Health & Social Care Benefits 
2.4 Telemedicine enables remote consultations, improving access to healthcare, while
wearable devices support self-management of long-term conditions. Enhanced
information sharing fosters better collaboration among healthcare providers, and
assistive technologies promote greater independence and safety at home. Additionally, 
1 The Scottish Household Survey (SHS) internet tables, local authority level, 2023.
2 Based on the percentage of households across Scotland – data not available at North Lanarkshire level by tenure.
Page 75 of 216

Page 76

broadband-enabled community alarm services deliver urgent response and resilience
for vulnerable residents.
• Telemedicine: Remote consultations improve access to healthcare.
• Health Monitoring: Wearables support self-management of long-term conditions.
• Information Sharing: Better collaboration among healthcare providers.
• Assistive Technologies: Greater independence and safety at home.
• Community Alarm Service: Broadband-enabled alarms provide urgent response
and resilience. 
Social Inclusion Benefits 
2.5 Community connectivity through social media helps reduce isolation and foster
relationships, while improved digital access makes it easier for tenants to use essential
services such as banking, public services, and social support.
• Community Connectivity: Social media reduces isolation and builds relationships.
• Access to Services: Easier access to banking, public services, and social support. 
Efficiency & Cost Savings Benefits 
2.6 Smart housing solutions deliver significant benefits by reducing mould and damp
issues, lowering the number of void properties, and cutting insurance premiums. Smart
care technologies help prevent hospital admissions, reduce care costs, and improve
medication compliance. Meanwhile, smart place initiatives enhance infrastructure
management, strengthen flood prevention measures, and improve air quality.
• Smart Housing: Reduced mould/damp issues, fewer voids, lower insurance
premiums.
• Smart Care: Fewer hospital admissions, reduced care costs, improved medication
compliance.
• Smart Places: Better infrastructure management, improved flood prevention, and
air quality. 
2.7 Given more services are being delivered online, which is increasingly becoming the
preferred method of contact - digitally excluded people are in danger of being left
behind. It is in this context that the council will provide for digital connectivity to all our
tenants and continue to understand the needs of those experiencing digital exclusion. 
2.8 Enabling digital connectivity for council housing tenants to thrive in a digital world,
empowers tenants through increased choice and control in the way they interact with
the council, provides faster access to services and improves customer experience,
while providing potential opportunities to radically transform, for the better, the way in
which the council delivers supports and services.
2.9 As previously reported to Policy and Strategy Committee in March 2025, the potential
benefits of digitally enabled homes are limitless in addressing digital poverty and wider
deep-rooted inequalities in our communities to overcome digital exclusion. 
Progress to date:
2.10 Expertise has been provided by secondees from the Glasgow City Region to support
the evidence base for council housing needs. A comprehensive review of broadband
Page 76 of 216

Page 77

and Internet of Things (IoT) initiatives across UK local authorities has been completed.
These initiatives have been compiled into a list of potential user cases for North
Lanarkshire Council (NLC), which were then assessed by various service areas,
including Social Care and Housing.
2.11 The assessment focused on identifying both the benefits and disbenefits that each
initiative could bring to NLC. This process led to the development of a league table
ranking the use cases most suitable for adoption, either ahead of or alongside the
Council’s implementation of Social Broadband. Legal Services have also reviewed the
legal implications of digital connectivity, particularly in relation to tenancy agreements,
data protection under GDPR, and data control responsibilities.
Timescales
2.12 Importantly, the implementation timescale for the digital connectivity project has been
significantly reduced from an initial estimate of 10 to 15 years down to a more ambitious
5-to-7-year plan.
Next Steps
2.13 To support the next phase of delivery, a new team will be stood up, comprising key
roles across implementation, governance, and engagement. This team will ensure
coordinated action and strategic alignment throughout the project lifecycle.
Test of Change 
2.14  The selected test of change sites represents a deliberately diverse cross-section of
housing types across North Lanarkshire. Nearly 2000 properties have been chosen to
reflect the full spectrum of housing contexts, including a high-rise tower block, which
present unique challenges in terms of infrastructure, safety, and community
engagement; temporary accommodation units, offering insights into transient housing
needs and support mechanisms; retirement complexes, where considerations around
accessibility, health monitoring, and wellbeing are paramount; and new build
developments, providing opportunities to explore integration of modern technologies
from the outset. Homes located within the most deprived areas have also been included
to ensure the initiative addresses inequalities and supports those who may benefit most
from innovation. Additionally, a rural village will be selected to explore the distinct
connectivity challenges and opportunities faced by more remote communities, ensuring
that digital inclusion efforts extend beyond urban centres and reflect the needs of all
residents across the council area.
2.15 This diverse selection is designed to test the adaptability and impact of proposed
changes across varied living environments, helping to identify best practices, 
barriers, and opportunities for scaling across the wider housing portfolio. 
2.16 To enhance the impact and learning from the test of change initiative, nearly 400 of the
2000 selected properties will form the pilot for tech-enabled homes. These pilot sites
will be equipped with smart home technologies tailored to tenant needs, allowing for
early evaluation of digital solutions in real-world settings. Table 1 lists the proposed pilot
sites. 
Table 1 
Page 77 of 216

Page 78

2.17  Success at the test of change sites can be measured through a combination of 
quantitative metrics, qualitative feedback, and impact assessments aligned with the
goals of the initiative. 
2.18 It is proposed that the delivery of superfast premium 1 Gigabit broadband solution to
34,880 council housing tenants is undertaken through an open invitation to tender to
identify a suitable supplier, with a report provided to a future committee on the outcome
of the successful tenderer.
Governance 
2.19 A Project Board has been established, which meets on an 8-weekly basis with
representation from a range of services to oversee the development of ultra-fast
broadband to council housing tenants; and to carry out a test of change initiative
involving a smart home technology model tailored to the needs of tenants. 
3. Measures of success 
3.1  Success will be measured through the implementation and completion of a test of
change to aid an understanding of the benefits, costs, and wider factors. 
4. Supporting documentation 
No supporting documentation. 
Stephen Llewellyn
Chief Officer (Housing) 
Name Area Type No. Units
Milton Court Airdrie Tower Block 93
Greenlaw House Wishaw
Temporary
Accommodation 10
Kerr Grieve Court Motherwell Retirement Complex 30
School Street  Coatbridge New Build 20        
Tarbolton Road Cumbernauld
Temporary
Accommodation 8
Calder Court Motherwell New Build 30        
Southfield
Cresent Coatbridge Mainstream 127
Flaxmill  to
Alderside 
Craigneuk,
Wishaw Mainstream 60          
Total Units 378
Page 78 of 216

Page 79

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
There are potential significant impacts across several protected characteristic areas,
some of which are compounded due to the intersectional nature of some protected
characteristics/inequalities experienced. It is considered that these impacts are
largely positive should the proposals be approved. A full EqIA is underway and will
continue to be developed and updated as required. 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐  
Financial Solutions is a key member of the Project Board tasked with developing the
detailed Business Case and costings. 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☒ 
If Yes, please provide a brief summary of the impact? 
Legal Services is a key member of the Project Board tasked with developing the
detailed Business Case. 
5.5 Data protection impact
Page 79 of 216

Page 80

Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
This will be considered by the Project Board. 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Business and Digital is a key member of the project Board tasked with the provision
of digital connectivity for council housing tenants with the potential for long-term
digital transformation and service redesign. 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
This will be considered by the Project Board. 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
There is the potential for carbon reduction through easier access to services.
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
Risks exist in relation to the failure to improve digital connectivity for social housing
tenants, alongside risks in relation to investment/disinvestment in some areas given
there are potential financial resource requirements. Risks are fully considered by the
Project Board and recorded appropriately. 
5.10 Armed Forces Covenant Duty
Page 80 of 216

Page 81

Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles
from the United Nations Convention on the Rights of the Child (UNCRC). 
An initial CRWIA has been completed which identified a positive impact for children,
young people and families, through improved access to online learning, educational
opportunities, improved education attainment, socialisation and future employability
prospects. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☒ No ☐ 
Page 81 of 216

Page 82

Page 82 of 216

Page 83

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    CC/ST Date 04/12/25 
Leadership & Operating Model – phase 2 progress update 
From  Carolynne Coole, Interim Chief Officer (Strategy and Engagement)  
E-mail CooleMillerC@northlan.gov.uk    Telephone  07583 036009 
Executive Summary 
As outlined in the leadership and operating model report presented to committee on 5th
June 2025, the Council continues to advance its transition over three phases within the
next 10-15 years towards a fully integrated town and community hub operating model. 
This report builds on the previous positive update, against the acceleration of phase 2. It
sets out further progress made to strengthen the delivery of more integrated support and
services from the community hubs, and how Council services continue to redesign their
service delivery models. The report also provides data in the supporting appendices to
illustrate development against several of the short-medium term measures of success. 
The report further describes investment made within the existing estate in support of a One
Service approach as part of our transition. This includes creating more vibrant, modern and
well-equipped workplaces for staff responding to service redesign needs. The report
illustrates dependencies across The Plan for North Lanarkshire programme of work in
support of the transition, such as hub strategy and development, corporate asset
management and approved rationalisation, digital transformation and strategic workforce
planning by Council services.   
The report seeks approval on plans and direction set out. 
Recommendations
It is recommended that Policy and Strategy Committee: 
(1) Acknowledge progress made since the last update to Committee on 5th June 2025
recognising the role of the approved Community Hub Coordinator roles in advancing
plans at pace.
(2) Promote the community hubs and their offering with local communities recognising
the impact against The Plan for North Lanarkshire and in support of the local
outcome improvement plans (LOIPs).
(3) Acknowledge the investment being made in the existing estate to embed a One
Service delivery approach as part of the operating model transition.
(4) Approve the direction set out with a further report to be presented to Committee in
June 2026.
Item 5
Page 83 of 216

Page 84

1. Background 
1.1 This report is an update on the Leadership and Operating Model and asset
rationalisation delivery plan discussed at Policy and Strategy Committee on 5th June
2025. 
1.2 Members will recall from the June meeting the positive progress made to accelerate  
phase 2 of the Leadership and Operating Model programme (Appendix 1) supported
by introducing the role of the approved Community Hub Coordinators.   
1.3 Phase 2 continues to focus on forming a more integrated place-based service delivery
model. This is underpinned by ongoing service redesign (as described in the One
Workforce report also presented to Committee today) with the community hubs acting
as a gateway for support and services, as well as a place for community-based staff to
work from locally. There continues to be a focus on early intervention, preventative
support and targeted activities being delivered based on local needs. The hub offerings
and modern well-equipped spaces available for community use also support delivery
of the local outcome improvement plans (LOIPs) as well as improved outcomes in line
with The Plan for North Lanarkshire. 
1.4 As approved by Committee on the 5th of June 2025 meeting, the direction in this phase
continues to advance the transition with further evidence of progress and impact
outlined in the report below and the supporting appendices. 
2. Report 
2.1 This report provides an update on the priorities within the leadership and operating
model delivery plan approved at Committee on 5th June 2025. It aims to clearly outline
the breadth of transition activity underway, with supporting appendices. 
2.2 The report focuses on two main areas: 
2.2.1 Progress within phase 2 since June 2025 including: 
• Establishing the hub coordinator role and enhancing a data-led approach
• Council and strategic partner organisations operating from hubs
• Community-led approaches and third sector presence 
• Developing an impact framework and supporting case studies that will mature as
the Council’s work on social value progresses
• Investing in existing assets to support the One Service approach 
2.2.2 Forward plan of next steps and the risks and mitigating action for this phase 
Progress within phase 2 since June 2025 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work One Service
Page 84 of 216

Page 85

Establishing the hub coordinator role and enhancing a data led approach 
2.3 Members will recall from the last report the work being undertaken by the Community
Hub coordinators to implement new systems and processes to better understand hub
footfall, user profile and range of activity, booking frequency and space utilisation.
Footfall at each hub has been captured between April and September 2025 and is
shown in table 1.0 below. The data for Chryston community hub includes total
attendance figures recorded at outpatient clinics and the treatment room. Across the
three hubs there are between 16-25 services and organisations accessing space and
working together on plans. These include statutory services, commissioned partners,
third sector organisations, community groups and clubs. 
Table 1.0 Community Hub footfall April to September 2025 
2.4 A detailed analysis relative to community hub activity themes, numbers of bookings
made, and space utilisation is provided in Appendix 2. Overall, the analysis recognises
an increase in the range of community support being delivered, the growing partnership
approach to delivery, and an increasing demand for use of hub spaces. It is evident
from the analysis that we have prioritised attention in this phase to: 
• enabling our approach to whole family support which includes a focus on
prevention and early intervention
• increasing Council service delivery and co-location with public sector partners and
the third sector
• developing an offer of health prevention and self-management programmes to help
people live as independently as possible and improve their overall health and
wellbeing 
• providing targeted programmes with local community organisations in support of
LOIPs and community action plans 
2.5 Furthermore, this analysis provides a measure against the strategic hub objectives and
the approved hub guiding principles (illustrated previously in the June 2025 report) as
we work towards realising our investment for the longer term. 
2.6 Hub delivery boards have now been fully established with a developed plan for 2025/26
and Q2/3 activity illustrated throughout this report. Stakeholder maps have been
developed to help tailor the approach, build support and align effort and expectations
49.899
59.458
51.722
11.927
17.724 17.387
0
10
20
30
40
50
60
70
Newmains & St Brigid's Riverbank Chryston
Thousands
Community Hub Footfall April to Sept 2025'
Incl. education Excl. education
Page 85 of 216

Page 86

for improved outcomes. Attention continues to be given to building the presence of the
hubs through various mechanisms and hub newsletters are issued monthly, see
Appendix 3. Newsletter analytics are measured monthly to measure the impact of the
newsletter as a communication method. Table 2.0 below highlights the Chryston
newsletter analytics with positive trends towards % completion and number of views
and reads. 
Table 2.0 Chryston Community Hub newsletter analytics May to September 2025 
Month Views
Average
minutes
spent
reading
Average
completion
%
Number
glanced
Number
read
quickly
Number
read in-
depth
May 293 <1min 45% 150 40 102
June  292 <1min 45% 153 43 107
July 203 2 mins 45% 110 29 64
Aug 781 1min 47% 373 196 217
Sept 1016 1min 53% 423 229 364 
Council and strategic partner organisations providing a core offer 
2.7 The hub delivery boards are driving greater understanding of the hubs, strengthening
partnership working and amplifying the opportunity that community hubs provide to
increase reach and offer support in the heart of communities.  An update on Council
and wider current and planned delivery from hubs is set out from section 2.8 through
2.30 below and illustrated in the timetable presented in Appendix 4. 
Whole Family Support 
2.8 Further to the report presented on 5th June to this committee, the commissioned early
help family support service ‘Families Here and Now’ (FHANS) continues to be a driver
for integrated place-based family support at the earliest point of intervention. FHANS
delivery can be observed in every community hub, with a different offer depending on
individual community need. Additionally in line with the operating model transition plan,
as new hubs are in design and development, FHANS have extended reach across
North Lanarkshire by leveraging use of other assets such as Motherwell library or the
Isa Money Centre. 
2.9 The service is consistently well used across North Lanarkshire, with 133 whole family
referrals received in the last quarter, and 40 individual meetings taking place across
community hubs. Integral in the GIRFEC staged intervention pathway, with the highest
number of referrals received from Education, followed by social work and then health.
The impact of this can be seen in case studies, and the report that was presented to
Education and Families Committee in October 2025. 
2.10 With the community hubs providing a vehicle for FHANS to engage with local people
in places they often go, central to the areas in which they live – the service continues
to use learning to inform delivery and refine the operating model. They continue to hold
regular drop-in sessions which are intentionally set on a Friday afternoon with whole
family activity sessions. Based on learning, the Art Wise project has moved from solely
Page 86 of 216

Page 87

large group-based support to a combination of individual, whole family group dynamic
work and wider group sessions in line with demand and need. 
2.11 After a full year of operation, demand continues to align with the themes identified in
the early consultation with families. This being emotional support, school attendance
and practical support. This reinforces the need to prioritise a flexible, early, responsive,
whole family support service within phase 2 as we transition to a new operating model.
A volunteer coordinator has been recruited and will further develop the relationship with
Routes to Work and the Council’s tackling poverty team, pursuing opportunities for co-
location. 
Community Learning and Development 
2.12 In addition to what was outlined in the 5th of June report to Committee, CLD has regular
weekly bookings across the hubs for the delivery of Youth Work activity and Family
Learning interventions.  During September and October family learning groups
launched at Newmains & St Brigid’s and Riverbank, and a new Therapeutic Thursday
weekly session commenced at Newmains & St Brigid’s Community Hub focused on
building practical life skills for young women. 
2.13 CLD activity at Orbiston hub is in planning for implementation in January, with core
activity having moved over from the Joe McKay centre at the end of November. A
timetable to maximise usage and occupancy of dedicated space is being prepared
currently by the Community Hub Coordinator. 
Housing support 
2.14 Housing locality team from Wishaw/Shotts continue to use the Newmains and St
Brigid’s Hub to facilitate weekly void meetings between Housing Services, Property
Services and Mears. Following the approval at Committee on 13th March 2025 to
introduce the new locality housing model, Chryston Community Hub is being used bi-
weekly for pre-arranged appointments as well as other facilities including libraries.
Early feedback from tenant’s is that the hub offers a stigma free and inclusive
environment where they can attend for support when needed. 
2.15 The tenant participation team continue to use the hub shared workspaces when
working in the local community and the Annual Tenant’s conference for 2025 was held
at Chryston community hub in November, having been the third community hub to host
the conference. 
Tackling Poverty 
2.16 The Tackling Poverty Team is using the hubs with pre-arranged appointments on
Monday (Newmains), Wednesday (Riverbank) and Chryston (Friday). Since 29th April
there has been 70 appointments attended which have been a combination of benefit
checks, help in relation to the migration of legacy benefits to Universal Credit, Council
tax reduction and applying for various disability benefits. A range of service users with
diverse needs have been supported who have found a face-to-face visit beneficial and
the wait time for an appointment is less than a week at present. 
2.17 The team continue to work with partners and other Council services in the community
hubs providing access for people to a range of holistic services such as the Families
Here and Now Service, Routes to Work and Sum it Up Project (Multiply Project). 
Page 87 of 216

Page 88

2.18 Riverbank has been the busiest hub to date with 34 appointments carried out,
Newmains 20 and Chryston 16. The team are currently planning operate from Orbiston
community hub. 
University Health & Social Care partnership (UH&SCP) / Adult Social Work 
2.19 There is a continued focus on increasing health promotion and early intervention
support from the community hubs. This is reflected in the community hub timetable
presented in Appendix 4 and the case studies in the impact frameworks in Appendix
5. Members will note that the developing offering supports several of the main
screening areas set out in the most recent public health report as well as targeted
activity in support of the local outcome improvement priorities around mental health
and wellbeing and the tackling poverty action plan such as smoking cessation.
Partnership working continues to strengthen at Chryston community hub with greater
connections with GP practice link workers, connected data gathering underway, and
enhanced information sharing to signpost and improve pathways to support. 
2.20 The NL Disability Forum commissioned by the UH&SCP and fundamental to our
community planning provide support to promote good mental, physical and emotional
wellbeing. Along with the Community Connectors they have a weekly presence in each
hub. 
2.21 The Making Life Easier (MLE) and disability information teams have recently increased
their resource capacity and are now planning to trial the delivery of blue badge
assessments and MLE clinics promoting the online support available and offering
assisted self-service support in the local community. 
2.22 Chryston community hub hosted a breast screening bus from September through to
November for people aged 50 to 70 years.  During the first three weeks, 509 screening
appointments were conducted. Extending the screening to other hubs is being
considered presently. 
2.23 The Human Learning Systems (HLS) approach is progressing within the operating
model transition. It ensures that our focus for community hubs is one that’s adaptive,
with a person-centred approach – as opposed to being a rigid and target driven one.
Combined with our commitment to being a trauma informed organisation HLS will
enhance our public service delivery model across North Lanarkshire. 
2.24 Our HLS in community hubs framework has 4-key pillars of community hubs, humanity,
learning and systems thinking. Designed to improve our approach and
responsiveness, integrating HLS within the operating model delivery plan fosters
empowerment, collaboration, and aims to deliver sustainable outcomes against the
plan for NL and LOIP’s to deliver for communities.   
Active and Creative Communities 
2.25 ActiveNL now has an established provision of physical activity classes at Newmains
and St Brigid’s and Riverbank community hubs of yoga, Zumba and body attack. 
Opportunity to respond to the waiting list at Ian Nicholson centre, as well as demand
from parents and families from the school, is being explored at Chryston community
hub subject to instructor availability. 
2.26 The corporate booking system approved at Communities Committee on 4th February
2024 has been implemented within the leisure estate as phase 1. We are now in phase
Page 88 of 216

Page 89

2 delivery which extends the functionality of the system (Gladstone MRM Plus2) across
community facilities and the corporate office estate. The project team has built and is
trialling the booking system as part of a proof of concept within the Coatbridge area.   
2.27 Subsequently a review will be completed to determine suitability to scale across all
hubs and other community operations and corporate bookable assets during 2026.
The introduction of a common system will improve the customer experience and
enhance analytics, business intelligence, and reporting to make better decisions
through phase 2 and into phase 3 of the operating model transition. 
Employability support 
2.28 Council funded employability services are now embedded and represented in all
community hubs through the ALEO Routes to Work Ltd, offering employability
information sessions and booked appointments to residents. These complement the
existing network of sessions run by the organisation in community facilities across
North Lanarkshire. The sessions continue to offer support to the target groups for
employability that are economically inactive, unemployed, or underemployed with a
particular focus on low-income parents. 
2.29 Integration and alignment with other services present in the hubs such as family
support, tackling poverty and CLD have been reinforced and supported by the
presence of these services with employability. A sustained presence in community
hubs and integration with other services continues to be the aim for the next 12 months. 
Community led approaches and increasing third sector presence 
2.30 The approved community-led approach within phase 2 is key to foster community
engagement, create more collaborative relationships and strengthen local connections
with the hubs – further reinforced by the approved hub guiding principles. The
community hub coordinators play a key role in building and establishing relationships
across communities supported by the community partnership team and tenant
participation team. Sections 2.31 to 2.50 below highlight work in this area. 
Intergenerational project between Newmains Family Learning Centre, Neighbourhood
Networks, and Getting Better Together 
2.31 The Newmains & St Brigid’s community hub continues to evolve as a vibrant space for
community-led initiatives, with a growing presence of third sector partners driving
inclusive and place-based approaches to wellbeing. A standout example is the
intergenerational programme delivered throughout July by Getting Better Together, in
collaboration with Newmains Family Learning Centre and Neighbourhood Networks.
This initiative brought together young children and adults with additional needs through
shared activities such as African drumming, mindful crafts, and sensory food
experiences. By fostering connection across generations and social groups, the
programme has strengthened community ties and showcased the hub’s role as a
catalyst for meaningful collaboration and local impact. 
2.32 Testimonial - “The hub space was perfect for our intergenerational sessions. There
was plenty of space and plenty of tables and seats. The space was great for the variety
of activities we had planned as some weeks we done a lot of moving around as part of
the activities. Other weeks we done some cooking which there was a kitchen prep area
right there where we needed it.” – Aleks, project lead from Getting Better Together 
Summer Walking Football Festival
Page 89 of 216

Page 90

2.33 Newmains & St Brigid’s community hub hosted a summer walking football tournament
led by six local teams, raising £610 for Chest Heart & Stroke Scotland (CHSS). The
event brought together Motherwell FC Community Trust, Stenhousemuir, North
Lanarkshire Council, Shotts BA, and WEBATA, who emerged as tournament
champions. CHSS staff were on site offering free health checks and advice, reinforcing
the hub’s role in promoting active lifestyles and health awareness through community
sport. 
2.34 Testimonial - “It was a fantastic night of football and fundraising... I had about seven
good chats with players around heart health, diabetes, atrial fibrillation, diet, and
sticking with prescribed meds... Around 30 health guides were picked up, and I handed
out three Adviceline cards for free nurse support.” – Kevin, CHSS 
Maximising use of the community hub drama space 
2.35 On Sunday 12th October, the Newmains & St Brigid’s community hub hosted two
packed performances of Artie’s Singing Kettle Halloween Special, coordinated by
community theatre group Spotlight Shotts. With 147 attendees across both showings,
the event demonstrated the impact of locally driven arts initiatives. By bringing live
theatre directly to Newmains, the project aimed to reduce transport barriers for local
families and supported local outcome improvement priorities (LOIP) around
accessibility. See image 1.0 below. 
Image 1.0 Artie’s Singing Kettle performance at Newmains & St Brigid’s hub 
2.36 The hub’s inclusive facilities—including wheelchair access via lift and a Changing
Places toilet—enabled families with additional needs to attend comfortably, with one
family attending both performances. The event fostered joy, connection, and positive
mental wellbeing, and highlighted the hub’s potential as a vibrant venue for arts,
theatre, and cinema. Feedback was overwhelmingly positive, reinforcing the value of
place-based creative engagement and a demand for more local opportunities in the
arts. 
Strengthening partnership with Newmains Community Trust 
2.37 Looking ahead, the Newmains & St Brigid’s community hub continues to support and
grow community-led initiatives in partnership with Newmains Community Trust.
Planning is underway for a community bike loan scheme, designed to integrate with
the local active travel infrastructure and path network—placing sustainable transport
options at the heart of Newmains. Collaborative efforts are also progressing to link
Page 90 of 216

Page 91

education with community groups through projects such as gardening and food
growing, fostering intergenerational learning and environmental awareness. These
developments remain a work in progress, guided by the hub delivery board, which
plays a vital role in enabling grassroots ideas to flourish. One such idea currently being
explored is a community Christmas movie night, bringing together key services to
deliver a festive, inclusive event for local families. 
ASNding Stars North Lanarkshire 
2.38 ASNding Stars North Lanarkshire is a sensory-aware class designed especially for
neurodivergent children and those with additional support needs. Classes are inspired
by football but they’re not traditional football classes. Instead, children engage in
movement, play and social interaction in a safe, pressure-free environment that’s built
around their pace and preferences. 
2.39 Sessions currently take place on Saturday mornings in the Gym Hall at Riverbank
Community Hub; there are three sessions, targeting children between the ages of 2-
12 years old, each week. c.80 families have been welcomed since starting in April 2025
with 28 families consistently signed up since the summer. 
2.40 Testimonial – “Riverbank Community Hub, for us, has been fantastic as the space
allows us to have our equipment spaced out to ensure it is not overwhelming for the
families and children that come to our classes. The main aspects for us are about
safety, especially for children with additional needs who might have the urge to elope
if they find an exit. To know our families are in a safe environment and a very accessible
space for changing, lift access etc is beneficial. Our families find it accessible and have
commented on how great a space it is, some didn’t realise the hub existed for classes
etc”. 
2.41 “One of our families that has been with us from the launch in April had been finding it
difficult to find classes that were suitable for their son and came along to see what our
classes were about. When we mentioned it is mostly free play and child led with no
pressure for their son to take part in any of the structured activities, they were happy
in the fact that they had found a class that would be a right fit. It has taken their son a
few months to become accustomed to the equipment, taking it at his own pace and it
is a real joy to see him becoming increasingly comfortable in himself but also with
others in the class. His father has noticed a big change in how he approaches the
classes from staying close to the door at the beginning to now getting involved in
activities such as the parachute games”. 
Riverbank Community Hub showcase and networking event 
2.42 On Friday 26th September, Riverbank Community Hub opened its doors to the local
community to promote the support services available from the hub on a weekly and bi-
weekly basis as well as programmes and projects that can be accessed at the hub. In
total there were 27 representatives from 17 services providing information and activity
for residents to come along and access. There was information on Carer Support,
Health & Wellbeing, Financial Support, Whole Family Support, Employability &
Training, Arts & Crafts, Youth Work activities, as well as ActiveNL taster sessions for
Zumba, Yoga and Pickleball – see image 2.0 below. 
Image 2.0 Service information stall and pickleball taster 
Page 91 of 216

Page 92

2.43 Testimonial – Ruth Matthews, Team Leader at the North Lanarkshire Disability Forum,
said, “I enjoyed talking to the other attendees and made links with some other services
that had not heard of us, so it was worth it. The members of the public that came in
were keen to hear more as well so I am sure the word will spread about what you are
offering.” 
2.44 Testimonial - Gosia Lipaj of Get Walking Lanarkshire added; “Thank you for organising
and finding a last-minute space for me. It was a great event for networking; I'm looking
forward to any future events you may host.” 
Child Bereavement UK 
2.45 Child Bereavement UK embarked on an outreach programme in response to feedback
from the Scottish Bereavement Network’s findings that there were less bereavement
services in Lanarkshire and other areas. Whilst there is a family service based in
Glasgow accessible online or by telephone, people were asking for a face-to-face
outreach service more locally. With a clear demand in North Lanarkshire, a
bereavement practitioner started working from Riverbank Community Hub in August
2025. 
2.46 The practitioner runs sessions that help young people understand and normalise grief
and look at strategies for helping cope with emotional regulation. They also help young
people to build continuing bonds with the important person that has died and support
them through whatever the grief is bringing up for them.  These sessions with children
and young people tend to consist of reading books, watching relevant videos and
creative age-appropriate activities.  All support is child or person centred, and the
service is also now promoting support for adults who have lost a child of any age. Since
August the service are now promoting their base in Coatbridge as seen in image 3.0
below. 
Image 3.0 Child Bereavement UK promotional leaflet 
Page 92 of 216

Page 93

Project 42 enhancing community wellbeing through accessible creative workshops. 
2.47 Project 42 (P42), funded through NL Carers Together carer breather programme, have
been delivering at Chryston Community Hub since July 2025. The two-hour sessions
are free although a donation can be given. Open to everyone they offer music tuition,
art therapy, and creative learning opportunities. The community hub enables a
welcoming and inclusive environment where participants can engage, express
themselves and connect with others. The aim is to promote confidence, social
inclusion, and improved mental wellbeing by removing barriers to participation.
Volunteering opportunities are also promoted helping individuals build confidence,
develop group facilitation skills, and enhance their employability through training and
mentorship. 
2.48 Since July there has been an average of 12 participants per workshop, with peak
attendance reaching 33 individuals.  The sessions continue to be promoted as can be
seen in image 4.0 below. 
2.49 Testimonial from P42 staff – “Chryston Community Hub has proven to be an excellent
venue for our workshops. The staff and management have been consistently
welcoming, accommodating, and responsive to our needs. Families have found the
layout within the social space particularly beneficial, as it allows for smooth transitions
between activities, even when different members of a group choose to engage in
separate sessions. The booth seating has been highlighted as a favourite feature,
offering a comfortable and semi-private space for creative engagement”. 
2.50 Testimonial from a father where both parents and two preschool children attend - "This
is brilliant—we can all do our own thing and still spend time together. I can see what
the wee ones are up to and step in if needed and still have time to actually learn my
guitar that I bought ten years ago and never could find the time to practice." 
Image 4.0 Project 42 promotional leaflet 
Page 93 of 216

Page 94

Developing an impact framework and supporting case studies that will mature as the
Council’s work on social value progresses 
2.51 Early work is underway to establish a process for social return on investment analysis
so that we can fully understand, measure and report on the value being created
through the operating model and delivery of supports from community hubs. This also
forms part of our Human Learning Systems approach outlined in section 2.23 and 2.24
above against the learning and systems thinking pillars – bringing together formal and
informal evaluation methods. 
2.52 Furthermore, members will recall that a memorandum of understanding (MOU) is in
place to enable public sector partners, community and voluntary sector organisations
and community organisations and groups directly contributing to the local outcome
improvement priorities to access hub spaces at no cost in support of capacity building
to deliver improved outcomes for communities. This also connects with the review of
the Grant Funding programme, providing an additional mechanism for local
organisations to build capacity. Establishing a mechanism where we can work with
partners to demonstrate impact underpins the ethos of the MOU. 
2.53 With all of this in mind Appendix 5 sets out a first phase impact framework for each
hub, phase 2 will develop the framework further to align with the Council’ approach to
Social Value as it progresses. Members are encouraged to note the early impacts
demonstrated in the range of case studies presented, and to consider that these are
just a few of the available examples and that we have selected those closely aligned
to key plan for NL health check indicators, particularly relevant to work being
undertaken around the economically inactive population. 
Investing in existing assets in support of the One Service approach to integrated
service delivery 
2.54 Following investment to relocate services from Kildonan Street to the Buchanan
Centre, the town hub is now operational with housing, social work, library and health
services located together – augmented with the new accessible digital zone.  The
Page 94 of 216

Page 95

investment made took a creative approach to adapting space through trauma informed
design to bring services together, improve public-facing service delivery spaces and
remove stigma by introducing a shared reception area for services, including Business
Gateway, to manage their diary-based appointments and individuals who present
seeking support.  North Lanarkshire Disability Forum are currently planning to operate
at Buchanan Centre for outreach work and given the proximity of services already in
operation there. 
2.55 To enable the demolition of Fleming House in Cumbernauld, housing operation
services were relocated to Bron Way. Further adaptations are planned for 2026 to
adapt and enhance space in Bron Way in support of public-facing service delivery and
as part of the Cumbernauld transition plan.  This includes enhancing main reception,
meeting rooms and creating a family room on the ground floor with trauma design being
firmly embedded in the approach. 
2.56 Bellshill Transport Hub was established to bring together staff from Community
Operations.  The hub facilities are spread over two floors, and the first-floor space will
be adapted to accommodate staff from the Bellshill Home Support locality. Providing
improved, modern and well-equipped space for work, meeting, supervision, training,
rest and welfare.  As a statutory service, providing greatly needed community support
within Bellshill, this relocation also responds to inspection improvement action. The
hub enables out of hours access with appropriate safety, security and car parking for
staff. 
2.57 Following the discovery of RAAC at Scott House, social work teams were swiftly
relocated to the Dalziel Building. Additionally following the First Stop Shop review and
implementation of the housing operating model, as well a new delivery model for
Registration and Licensing services, and the introduction of Business Gateway service
to the Council, the opportunity to future proof Dalziel Building front facing delivery
space was identified and progressed during 2025.  Phase 1 is complete with phase 2
planned for 2026 as part of the asset rationalisation delivery programme and aligned
to the corporate asset management plan. 
2.58 Finally, as part of the future capital delivery programme a plan to reconfigure the
Houldsworth Centre in Wishaw will align the operation of the building to the new
operating model and One Service approach.  And the integrated Hub at Calderhead
High School in Shotts will be relocated during 2026 to support phase 2 plans by
providing more flexible spaces and enable safe and secure access out with normal
working hours. 
Forward plan of next steps and the risks and mitigating action for this phase 
2.59 Next steps 
2.59.1 Establishing the operating model at Orbiston Hub within the next six months and
preparing for four further new hubs going operational by the end of 2026.  
2.59.2 Scenario planning to inform future hub strategy as the second stage of each Council
service submitting their One Workforce plan and an assessment of future direction. 
2.59.3 As part of the scenario planning there will be a further and wider data analysis
exercise on customer demand on Council services and community use/letting of
spaces across assets as we seek to promote an asset-based community
development approach. This analysis will enable an up-to-date understanding around
Page 95 of 216

Page 96

main areas of enquiry and demand as well as who is using our assets, for what and
when to aid future planning.   
2.59.4 Ongoing engagement with community planning partners, local community
organisations, community councils and wider stakeholders in partnership with the
community partnership team in line with the working with communities framework. 
2.59.5 Supporting the implementation of the community wealth building approach in plans. 
2.59.6 Partnership working with the Planning team in the Place service to share intelligence
relative to future design, planning and development of hubs linking to the results of
the Your Place Survey and joint work on asset mapping within Transforming Places
POW. 
2.59.7 Following the launch of the ‘Trauma Design in the built environment toolkit’ in Q1
2025, continue to ensure that trauma design is applied to all future hubs. Annual
trauma walk throughs implemented. 
2.59.8 Input to future hub design in partnership with the hub development and strategy team
and appointed architectural design teams, as well as presence at the Town and
Community Hub steering group. With formal lessons learned being shared with the
hub design and strategy teams. 
2.59.9 Ongoing linked implementation of the single telephony solution, which is critical to the
front end of the operating model in terms of both improving the customer experience
and providing intelligence on what and who is accessing support and services and
building our internal capacity to work in new and more efficient digital ways to respond
to customer demand. The telephony solution is equally important to get it right for
people who may present at the hub for a gateway to other supports and services. 
2.59.10 Participation in the Digital NL POW ‘Improving the Customer Experience’ group to
link dependencies and particularly in the areas of digital inclusion, front end customer
experience and trauma informed organisation. 
2.59.11 Ongoing planning through the hub delivery boards with continued development of the
impact framework aligned to the Council’s approach to social value 
Risks and mitigating actions 
2.58 Risk and mitigating actions table 
Risk BRAG Mitigating action
Ensuring that the
implementation of the
approved Corporate
Booking System enhances
the customer experience
i.e. both front-end
experience for users (tied
to work to enhance the
Council website
content/pages in the One
Service POW) and the
back-end reporting 
• Project officer secured until December 
• Approved as a shared deliverable in The Plan for NL
POW between Community Operations and Strategy
and Engagement functions with the PoC dependent
upon community facilities adopting the new system
successfully for both front end and back-end
functionality
• Resource allocated from community facilities and
operating model team to prioritise attention to
implementation
Page 96 of 216

Page 97

functionality to improve
business intelligence. 
• Initial user testing completed with internal and external
customers to support build
• Staff involvement in development and design through
user personas to develop shared understanding and
support training and awareness. 
• EQIA live document in progress
Reliability of public Wi-Fi
connectivity and
implementation of printing
facilities for external
partners 
• Wider digital requirements have been identified for
hubs with delivery by digital first operations subgroup. 
• Issues are raised quickly through tickets by the hub
coordinators and being pursued or escalated with
colleagues to find solutions
• Investigation with provider over performance quality
and solutions being trialled across sites
Promoting community
hubs and ensuring a
consistent online
presence, with multi-
channel communications
available 
• MyTown channels used to promote activity
• Plan to develop website underway
• Digital screen installation at hubs to enhance customer
experience and signposting
• Digital newsletters issued and performance analysed
• Physical materials also available including leaflets and
timetables of what’s on
Ability to be demand
responsive to community
needs whilst maintaining
required governance
requirements 
• Operating model delivery manager working effectively
across plan for NL POW boards and with officers
• Employment of hub coordinators and success of
partnership relationships developed evidenced
through their hub delivery and in partnership with other
Council officers across POW deliverables
• Hub delivery groups as a vehicle for participants to
strengthen networks
• Hub coordinators knowledge of local area and
network, leveraging community resources where
possible incl. grant funded organisations and
leveraging available funding through the boards
• Working with the community partnership team through
the working with communities’ approaches.  
Ensuring lessons learned
are carried forward into
future hub projects and
action is not limited by
financial constraints. 
• Hub steering group as a vehicle to share learnings and
build learnings requirements into tender process and
budget allowances
• Ongoing liaison with hub strategy and development
team, as well as corporate repairs and maintenance,
property teams
Hub maintenance, hub
handover processes to be
improved to ensure
consistent clarity around
some of the operational
maintenance aspects. 
• Steps have been taken to provide a maintenance
schedule for hubs to ensure shared responsibility in
line with facilities RACI matrix. The OMDT will ensure
processes are in place as necessary which has so far
included, changing places maintenance and outdoor
spaces out-with school and facility remit. 
• Hub Coordinators to be part of future handover and
decant meetings.
• Lessons learned completed for each hub and
communicated with Hub Development and Hub
Strategy Teams.
Page 97 of 216

Page 98

Hub maintenance relative
to the areas within the
schools that offer space for
an increased provision at
seasonal times and
holidays tend to be closed
for maintenance work. 
• Hub coordinator is aware of planned works schedules
with corporate repairs and facilities teams to look at
alternative provision of spaces where needed.
• May need to consider work out of hours based on
demand. 
Resource capacity to
enable future planning
including analyst support
for scenario planning for
future hubs 
• Leverage analytical skills within the wider hub
development and strategy team.
One service approach – All
council services,
commissioned partners
and community groups
effectively using the space
alongside education. 
Council service redesign
ongoing as part of One
Workforce plan and
service workforce plans 
• Progress has been made with key Council services
and partners to leverage the hubs for service delivery.
This is supported by the plan for NL POW governance
structure. 
• Ensuring the integration of partners within the hubs is
working effectively alongside education service
delivery. Engagement with education staff, HTs, EFMs
and COs ongoing. 
• There is a timetable of services, partners and third
sector organisations using the hubs regularly with an
increase in community activity and partnership
projects alongside education as alternative curriculum
choices. 
Potential tension with
community councils and
organisations who operate
in the local area from other
assets and perceived
threat of hubs to their
delivery model. 
• Hub Coordinator continued presence at community
boards and building relationships with organisations in
their areas.
• Community organisations visiting the Hubs and
meeting the coordinators exploring opportunities to
work together given we serve the same people across
our communities and aspire to leverage all resources
available through collaboration. 
3. Measures of success 
3.1 Several measures are outlined in the project brief against the three phases of delivery
to show how we are delivering for communities through improved outcomes and
support the management of risk/mitigate impacts of adverse events. 
3.2 Each hub is in the process of developing a social return on investment framework
(Appendix 5) through the hub delivery board given the local context and blend of
integrated service provision, wider governance considerations.   
What  How S/M/L term
1 Maximise occupancy
and usage of hub
spaces
• Activity Analysis reporting
• Quantifiable income
generation from Community
Facilities and ACC services
Short term 
2 Hub spaces are used
to support strategic
needs and priorities,
• Activity analysis of spaces
• Qualitative feedback from
people received through
Short term
Page 98 of 216

Page 99

and user feedback is
positive
statutory and non-statutory
service providers, case
studies and testimonials. 
• Customer experience survey
3 Evidence of integrated
working/partnerships
in hub delivery plan
• No. of organisations using
hub spaces
• Evidence of joined work on
support activities and
programmes
• Range of services co-located
and working together in hub
timetable
Short to
medium term
4 Social media
reach/user feedback
• Social media data from
comms team once channels
are leveraged and web pages
completed/increased use of
MyTown pages.
• Case studies, testimonials
and direct feedback from
statutory and non-statutory
services, organisations using
hubs. 
• Customer experience survey
Short to
medium term
5 Supports and services
are accessible with
good engagement by
target groups
• Uptake of support, activities or
services. Council functions
and other organisations
collect and report their own
data to be fed into hub impact
framework (in development).
• Qualitative feedback from
testimonials and case studies
Medium term 
What  How S/M/L term
6 No. of contacts/people
supported relative to
general advice,
financial
inclusion/debt money
advice,
literacy/language
skills/qualifications,
employability, digital
inclusion etc. 
• Uptake of support, activities or
services. Council functions
and other organisations
collect and report their own
data to be fed into hub impact
framework (in development).
• Qualitative feedback from
testimonials and case studies
Medium term
7 Reduction in demand
for additional/intensive
statutory services 
• Uptake of support, activities or
services. Council functions
and other organisations
collect and report their own
data to be fed into hub impact
framework (in development).
• Reduction in referrals to
additional/intensive services 
Medium term
Page 99 of 216

Page 100

• Qualitative feedback from
testimonials and case studies
(in development with early
positive visibility of reduction
in escalation to SW)
8 Number of people
accessing assisted
self-service in the
hubs 
• Visitor management and
onsite informal tracking of
signposting by hub
coordinators.
Medium term
9 Comparison of usage
across assets within
NLC
• Activity analysis of use of
spaces
• Visitor management system
• Information gathered by
services/organisations as to
how and what people are
accessing and where.
Medium term
10 Progress of LOIPs
and outcomes agreed
as part of future hub
delivery plans that
contribute to the
outcomes set in the
plan for North
Lanarkshire 
• Alignment with developing
hub offer and LOIP priorities
and connections to plan for
NL health check indicators
• Connections to community
council/local orgs action plans
Medium to
long term
11 Number of
organisations applying
for/receiving grant
funding contributing to
delivery 
• Stakeholder map of local
organisations 
• Hub coordinators mapping
with community partnership
team which are contributing
Medium to
longer term 
What  How S/M/L term
12 Number of
volunteering or
placement
opportunities available
in hubs
• Volunteering embedded within
family support or other
services
Medium to
longer term 
3.3 The programme overall: 
• Provide an operational focus point for other projects and programmes to realise
their financial and non-financial benefits e.g., shared asset rationalisation, service
reconfiguration, service re-design proposals for integrated provision 
4. Supporting documentation 
4.1 Appendix 1- Three approved phases of the operating model transition plan 
4.2 Appendix 2 -HUB activity analysis for each community hub
4.3 Appendix 3- October newsletter for Newmains & St Brigid’s Community Hub          
October newsletter for Riverbank Community Hub
Page 100 of 216

Page 101

October newsletter for Chryston Community Hub
4.4 Appendix 4-Collective weekly community hub timetable (individual ‘what’s on’ can be found
in each newsletter above in Appendix 3)
4.5 Appendix 5- Impact frameworks (phase 1) for Newmains & St Brigid’s, Riverbank and
Chryston hubs 
Carolynne Coole
Interim Chief Officer, (Strategy and Engagement) 
Page 101 of 216

Page 102

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The implementation of town and community hubs and ambitions to reduce the
inequalities caused by socio economic disadvantage align with the requirements of
the Fairer Scotland Duty. 
The EQIA for phase 2 has been completed and EQIA’s are completed for required
projects and in partnership with services. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☒ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts been discussed and agreed with
Finance?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The strategic capital investment programme allocation is a key factor in the
development of an operating model for the effective delivery of services within the
heart of communities. As members will be aware both SARIS and the delivery of
new town and community hubs both have the capacity to support these objectives.
While the development of new hubs may increase development costs marginally
there are significant benefits to be delivered in the associated rationalisation of the
Council's estate and proven operational advantages associated with the
implementation of the revised operating model of service delivery. 
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☒ No ☐
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The impact of any workforce changes emerging during phases of the programme will
be dealt with in line with the council’s Managing Workforce Change - Framework
Guidance.  
We must ensure that any changes to approaches as our future workplace model
matures are reviewed and supported by policies and guidance. Full engagement with
Trade Unions will be taken forward as required. 
Safety and wellbeing implications around access, safety and security and also
safeguarding. Safety and security guidance is continually updated and made
available on the future workplace section of myNL. The safety and wellbeing team
will continue to work with local teams to advise appropriate measures are in place at
Page 102 of 216

Page 103

a local level around safety, security, fire safety and first aid. Communications and
engagement with management teams of key workforce groups will also take place
as appropriate, and toolbox talks encouraged with staff as necessary. Furthermore,
the approach taken is intended to have a positive impact on mental health and
wellbeing and TU’s will be engaged as appropriate through existing channels. The
safety and wellbeing team are engaged on the POW steering group and continue to
advise and guide through phases. 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☒ No ☐
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Extending our use of hub spaces to public sector partners in phase 2 required a
Memorandum of Understanding to be in place to support objectives of this
agreement and to ensure consideration towards insurance liabilities and statutory
requirements around safeguarding. This was supported by legal colleagues who will
continue to be engaged through delivery phases – particularly relative to the impacts
of public sector reform.
. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☒ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☒ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
There is a specific set of digital requirements if the operating model is to achieve its
ambitions. A number of these are already in place and need to be maintained or are
in development.  Work with finance and technology team will be ongoing in support
of the model –and the appropriate governance structures will be applied. The
implementation of the corporate booking system whilst will have no adverse impact
on roles will have some impact on operational practices as the self-service
functionality is introduced. This is seen as a benefit and shift from cumbersome
manual processes, enabling real time live information sharing, booking and
monitoring. 
Page 103 of 216

Page 104

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Enabling staff to work locally has a positive impact on the environment and an
individual’s carbon footprint around commuting, as well as potential positive health
impacts by enabling greater choice and flexibility to how people work. The shift side
to that is the utility use/office energy consumption through a work local approach
(although within the wider context of shared assets, asset rationalisation and
investment in more energy efficient buildings and hubs positive benefits should be
realised over time) 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
There is significant impact around communication and engagement with
communities and with staff – the programme continually has a requirement to align
with the emerging direction of our approaches and the ‘Working with Communities
framework’.  Communication and engagement plans are developed throughout
each stage of the POW and colleagues from Strategy and Engagement and the
Community partnership team continue to be involved throughout phases of
delivery. 
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The project risks are captured in the project risk register and managed through the
programme and projects. The main risks and mitigating actions are described in
section 2.57 with a broad summary for the longer-term programme below:
• Finance – delivery of strategic capital investment programme and ongoing
review of priorities, risk to savings not being realised through service
redesign to transition towards a new operating model. Further opportunity in
this phase for financial modelling as hubs work to realise the investment of
£111m and forward investment.
• Digital – ability to meet the infrastructure and technical support needs either
through lack of resources, lack of funds, or alignment of pace
• Political unknowns – implications of savings decisions and public sector
reform
• People – challenge of culture change relative to co-location and integrated
working to underpin the success of the model
Page 104 of 216

Page 105

• Communities – ensuring full participation from communities, sharing of
insights and intelligence in support of the model and realising the ambition
of the Community Boards and working with communities framework. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other residents in the provision of public services. 
• Our approach to participation planning to ensure that all residents with lived
experience are included in co-design/co-creation of services, and we
engage with relevant organisations
• Completion of the EQIA 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
Approach to whole family support outlined in the report. 
An overarching CRWIA has been completed as part of the preparation for the new
Children’s Services Plan 23-26.  The Children’s Services Plan 23-26 includes
priorities and actions on how the Children’s Services Partnership will further
children’s rights and UNCRC in NL. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☒ No ☐ 
Page 105 of 216

Page 106

Appendix 1 – Three approved phases of the operating model delivery plan 
Page 106 of 216

Page 107

Appendix 2 –Newmains & St Brigid’s Community Hub activity analysis.  January to September 2024 V January to September 2025 
Activity being delivered: Activity has been themed into areas as can be seen from the graph below. Data is taken from bookings recorded by
community facilities and reflects our focus on key strategic priorities. 
Points to note:
Support for Families: Bookings for family-focused
activities increased indicating focus on whole family
support with growth and engagement from services
aimed at supporting families such as FHANS.
Growth in NHS services: There was a sharp rise in
bookings under health & wellbeing from 4 to 142—
highlighting the hub’s expanding role in delivering
targeted place-based NHS services such as
Occupational Therapy, Mental Health support, Veterans
support, and Health Improvement. 
Sports & Fitness: Usage increased from 720 to 929
bookings, reflecting increased demand for physical
activity and wellbeing programmes including a place
based Active NL offering.
Council-Led Place-Based Support: Bookings by North
Lanarkshire Council (NLC) services rose from 223 to
458, showing a clear shift toward more integrated,
place-based service delivery through the hub.
Page 107 of 216

Page 108

Appendix 2 – Newmains & St Brigid’s Community Hub activity analysis.  January to September 2024 V January to September 2025 
Bookings made: During the reporting periods bookings increased from a total of 1,145 in 2024 to a total of 1,843 in 2025. 
Graph 1 shows a month-by-month comparison of hub
bookings between 2024 and 2025 using a line graph. It
highlights seasonal trends and differences across the two
years, unlike Graph 2 which focuses on overall yearly growth
and percentage increases. 
Graph 2 compares bookings year by year using a cluster
chart, with a trendline showing how growth is accelerating
with seasonal dips during summer. It highlights the continual
percentage increase in bookings each year. 
Growth started at ~12% in January, peaking at ~137% in
April. While seasonal dips occurred during holidays, overall
engagement continues to rise. 
Page 108 of 216

Page 109

Appendix 2 – Newmains & St Brigid’s Community Hub activity analysis.  January to September 2024 V January to September 2025
Space utilisation: The graph below presents a bar chart comparing the frequency of bookings for each hub space across the two periods. It
highlights which spaces were most in demand and illustrates changes in usage patterns over time. 
Points to note:
• Most spaces saw increased bookings
year-on-year, with Meeting Rooms
and Outdoor Pitches showing the largest
rises.
• Spaces like the social dining area and
multipurpose room also saw more use,
indicating broader community
engagement.
• The range of spaces used reflects a mix
of services, activity groups, and
community needs—from sports and
meetings to social and creative sessions.
Page 109 of 216

Page 110

Appendix 2 – Riverbank Community Hub activity analysis.  January to September 2024 V January to September 2025 
Activity being delivered: Activity has been themed into areas as can be seen from the graph below. Data is taken from bookings recorded by
community facilities and reflects our focus on key strategic priorities. 
Points to note
Supporting families and support groups/services: The
integration or services such as Routes to Work, FHANS and
Carers Together has seen a positive increase in bookings for
use of space, which illustrates our priority focus to enhance
the provision of whole family support. Bookings rising from
1>44 and 0>165 respectively.
NLC Services: Council services are now embedded in the
hub with Tackling Poverty and the North Lanarkshire
Disability Forum now established offering financial and
disability support.
Sport & Fitness: Bookings and usage remain strong with
overall bookings increasing by 20% in 2025. This is
predominately due to evening and weekend hire of the 3G
pitch and an increase in use of the gym hall by Bushido
Karate and ASN Stars Football NL.
Growth in NHS services: There was an increase in
bookings from 0-31 highlighting the hub’s expanding role in
delivering targeted place-based NHS services such as Stress
Control, Smoking Cessation and Peri natal support. 
Childcare: Use of space dropped due to availability of
suitable storage space for prams as use of the hub
increased, with the group moving to another facility. 
Page 110 of 216

Page 111

Appendix 2 – Riverbank Community Hub activity analysis.  January to September 2024 V January to September 2025 
Bookings made: During the reporting periods bookings increased from a total of 1,799 in 2024 to a total of 2,305 in 2025. 
Graph 1 shows a month-by-month comparison of hub
bookings between 2024 and 2025 using a line graph. It
highlights seasonal trends and differences across the two
years, unlike Graph 2 which focuses on overall yearly
growth and percentage increases. 
Graph 2 compares bookings year by year using a cluster
chart, with a trendline showing how growth is
accelerating. It also highlights the percentage increase in
bookings each year. 
Hub bookings rose from 1,799 in 2024 to 2,305 in
2025.Significant growth peaked at ~42% in May 2025.
While seasonal dips occurred during holiday periods,
there is still growth during the Easter (April) and summer
(July) periods AND overall engagement continues to rise.
Page 111 of 216

Page 112

Appendix 2 – Riverbank Community Hub activity analysis.  January to September 2024 V January to September 2025 
Space utilisation: The graph below presents a bar chart comparing the frequency of bookings for each hub space across the two periods. It
highlights which spaces were most in demand and illustrates changes in usage patterns over time. 
Points to note:
• Most spaces saw increased bookings
year-on-year, with Meeting Room 1 and 2
showing the largest rises for client-based
work, meetings with parents and diarised
appointments. 
• The Community and Conference Rooms
have both seen more usage by services
for larger meetings and training. 
• While the Outdoor Pitches have always
proven popular at the hub, there is still
steady growth reflected. The rise in Gym
Hall usage also points to more flexible
usage of the facility with larger meetings,
events and Community board use taking
place.
Page 112 of 216

Page 113

Appendix 2 – Chryston Community Hub activity analysis.  January to September 2024 V January to September 2025 
Activity being delivered: Activity has been themed into areas as can be seen from the graph below. Data is taken from bookings recorded by
community facilities and reflects our focus on key strategic priorities. 
Points to note
Supporting families and support groups/services: The
integration or services such as Routes to Work, FHANS and
Carers Together has seen a positive increase in bookings
for use of space, which illustrates our priority focus to
enhance the provision of whole family support
Youth Work/Organisations: Bookings for these activities
increased due to growing engagement with the local
community in a variety of ways e.g. Scouts, Project 42 Music
and Arts. 
Sports & Fitness: Usage increased by 933%, reflecting
increased demand for physical activity and wellbeing
programmes through Health Walks, indoor football and
dance. Note: Chryston Hub does not have outdoor pitches
as the other hubs. 
Council-Led Place-Based Support: Bookings by North
Lanarkshire Council (NLC) services rose by 31% showing a
clear shift toward more integrated, place-based service
delivery through the hub.
Page 113 of 216

Page 114

Appendix 2 – Chryston Community Hub activity analysis.  January to September 2024 V January to September 2025 
Bookings made: During the reporting periods bookings increased from a total of 152 in 2024 to a total of 521 in 2025. 
Graph 1 shows a month-by-month comparison of hub
bookings between 2024 and 2025 using a line graph. It
highlights seasonal trends and differences across the two
years, unlike Graph 2 which focuses on overall yearly
growth and percentage increases. 
Graph 2 compares bookings year by year using a bar
chart, with a trendline showing how growth is
accelerating. It also highlights the percentage increase in
bookings each year. 
Hub bookings rose from 152 in 2024 to 521 in 2025.
Significant growth peaked at ~2850% in July 2025. While
seasonal dips occurred during holiday periods, the
overall engagement continues to rise. 
Note: The Hub was closed for 17 days in April 2025 for
essential Hub maintenance, resulting in a drop in
bookings and footfall for that month.
Page 114 of 216

Page 115

Appendix 2 – Chryston Community Hub activity analysis.  January to September 2024 V January to September 2025 
Space utilisation: The graph below presents a bar chart comparing the frequency of bookings for each hub space across the two periods. It
highlights which spaces were most in demand and illustrates changes in usage patterns over time. 
Points to note:
• In general, there has been an increase in
space usage compared with the same
2024 period. 
• All spaces have seen an increase in
usage since the previous annual period. 
• Use of the social dining area depends on
suitability against requirements. At times
when the hub is full the space is a
thoroughfare with noise from surrounding
areas.  It is best used in isolation or in
conjunction with adjacent spaces for
larger events and as reflected in
Appendix 5 feedback from Project42.
Page 115 of 216

Page 116

Appendix 4 - Collective weekly community hub timetable 
Monday Tuesday Wednesday Thursday Friday Saturday Sunday
Newmains & St Brigid'sTackling Poverty Team (First point of contact) weekly clinic 9am -
5pm (Meeting Room A)
Headteacher Meetings 8.30am - 9.30am (Meeting Room B)
Tackling Poverty Team (Resettlement) 1pm - 5pm (Meeting
Room B)
Phoenix Futures family support 12pm - 2pm (Conference Room)
1-1 Learning Support St Brigid's Cluster 2pm-3pm (Conference
Room)
School Headteachers 3pm-4pm (Conference Room)
Football Groups 6pm - 9pm (3G Pitches - Full)
School Headteachers 8.30am - 9.30am + 3pm - 4pm (Meeting
Room A)
Teen Talk counselling services  9.30am - 11.30am (Meeting
Room A)
Families Here & Now Service 1pm - 2pm (Meeting Room A *bi-
weekly)
1-1 Learning Support St Brigid's Cluster 2pm-3pm (Meeting
Room A)
NHS Primary Care Occupational Therapy 9am - 5pm (Meeting
Room B)
NHS Mental Health Team 9am-11am (Conference Room)
Clyde Valley Cluster 11.15am - 12.15pm (Conference Room)
NHS Veterans First Point 1pm - 4.30pm (Conference Room)
CLD family learning taster sessions**
Football Groups 6pm - 9pm (3G Pitches - Full)
School Headteachers 8.30am - 9.30am  + 3pm - 4pm (Meeting
Room A)
Families Here & Now Service 1pm - 3pm (Meeting Room A)
Routes to Work 11am - 4pm (Meeting Room B)
1-1 Learning Support St Brigid's Cluster 11am-12pm
(Conference Room)
Headteacher meeting 1pm - 2pm (Conference Room)
NHS Integrated Day Service 2pm - 4pm (Conference Room *bi-
weekly)
NHS CAHMS service 2pm - 3pm (Conference Room bi-
weekly)
Active NL Zumba 6pm-7pm (Gym Hall)
AA Support Group 7pm -10pm (Multi-purpose Room)
Football Groups 6pm - 9pm (3G Pitches - Full)
School Headteachers 8.30am - 9.30am  + 3pm - 4pm (Meeting
Room A)
Families Here and Now Service 10am - 2pm (Meeting Room A)
St Aidan's Cluster Meetings 1:1 meetings 1pm - 3pm (Meeting
Room A)
NL Disability Forum 10am - 3pm (Meeting Room B)
Wishaw Housing weekly void meeting 10am - 12pm (Conference
Room)
Active NL 129 Body Attack 6.15pm -7.15pm (Gym Hall)
Active NL Yoga 7.15pm - 8.15pm (Gym Hall)
CLD Girls Group Theraputic Thursdays 5.30pm-8.30pm (Social
Area)
Football Groups 6pm - 9pm (3G Pitches - Full)
School Headteachers 8.30am - 9.30am  + 3pm - 4pm (Meeting Room A)
Phoenix Futures family support 10am - 2pm (Meeting Room A)
NL Carers Together weekly clinic 10am - 4pm (Meeting Room B)
Families here and now service 10am - 11am (Conference Room +
Meeting Room A)
Kinship Carers weekly peer-support group 10am - 12pm (Conference
Room *first of the month)
Football Groups 6pm - 9pm (3G Pitches - Full)
Football Pitches 12pm -
3pm (3G Pitches Full)
Football Pitches
12pm - 4pm
Riverbank NL Carers Together 8.30am-5pm (Meeting Room 1)
School Headteacher 9am-10am (Meeting Room 2)
NLC Education 9.30am-1pm (Conference Room)
CLD Family Learning Group 2.30pm-4.30pm (Community Room)
C&S Out of Shool Care 3pm-6pm (Social Area/Multipurpose
Room)
NHS Perinatal Mental Health - Finding Me 9am-1pm (Community
Room)
Bushido Karate 6pm-7pm (Gym Hall)
Football Groups 6pm-9pm (Football Pitches in use except pitch 2
between 8pm-9pm)
School Headteacher 9am-10am (Meeting Room 2)
NHS Quit Your Way 9am-1pm (Meeting Room 1)
Child Bereavement UK 1pm-5pm bi-weekly (Meeting Room 1)
School HT 2.30pm-3.30pm (Meeting Room 2)
Active NL Yoga class 11am-12pm (Community Room)
NL Carers Together team (Staff/Partnership zone)
Education and Families Project Manager (Staff/Partnership
zone)
C&S Out of Shool Care 3pm-6pm (Social Area/Multipurpose
Room)
Football Groups 6pm-9pm (Football Pitches - full usage)
School Headteacher 9am-10am (Meeting Room 2)
School HT 2.30pm-3.30pm (Meeting Room 2)
Tackling Poverty 9.30am-4.45pm (Meeting Room 1)
C&S Out of Shool Care 3pm-6pm (Social Area/Multipurpose
Room)
Football Groups 6pm - 9pm (Football Pitches - full usage)
NHS psychological services stress management workshops -
6.30pm-8pm during Summer Holidays (Community room)
School Headteacher 9am-10am (Meeting Room 2)
Routes to Work 9.30am-4.30pm (Meeting Room 1)
Drumpark FL Group 9am-4pm (Community Room)
Housing tenant participation (Staff/Partnership zone)
School HT 2.30pm-3.30pm (Meeting Room 2)
C&S Out of Shool Care 3pm-6pm (Social area/multipurpose
room)
Active NL - Zumba class - 6pm-7pm (Gym Hall)
Football Groups 6pm - 9pm (Football Pitches in use except pitch
2 between 8pm-9pm)
School Headteacher 9am-10am (Meeting Room 2)
NL Disability Forum 9am-12.30pm (Meeting Room 1)
NHS Perinatal Mental Health - Circle of Security 10am-12pm (Community
Room)
Families here and now service drop in 2pm-4pm (Meeting Room 2)
School HT 2.30pm-3.30pm (Meeting Room 2)
C&S Out of Shool Care 3pm-6pm (Social Area/Multipurpose Room)
CLD Youth Group 5.30pm-8.30pm (Gym Hall/Dining Hall/Multi Purpose
Room)
Football Groups 6pm - 9pm (Football Pitches - full usage)
Football Pitches 9am -
3pm (Football Pitches -
full usage)
Families here and now
service community room
(10am to 3pm)
ASN Stars Football NL
(930-230pm Gym Hall)
Football Pitches
9am - 3pm
(Football Pitches -
full usage)
FHANS Service 11am - 12 noon MR2
North Lanarkshire Disability Forum  1pm - 4pm   MR2                                                                                                               
LOIP Health Inequalities Sub Group  (Monthly) 6pm - 8pm  
Community Room                                              
Sparkles Dance Academy, Gym, 5pm - 7.30pm   Gym Hall                                                                                                
NLC Housing Services (bi-weekly) 9am - 4pm     MR1                                                                                              
SAMH Well informed Service (monthly) 10am - 2pm  MR1
Routes to work supported by Tackling Poverty Team  (meeting
room 2 -  9am-5pm)  
Advance dance Academy, Gym, 5pm - 9pm    Gym Hall                                                         
Primary Care Occupational Therapy Service 8.30am - 5pm 
Community Room                                                                                       
FHANS 2pm - 4pm MR1
Carers Together 830am - 430pm (Meeting Room 1)                               
School Activity - Barnardos -  9am-330pm  MR2                                            
CIIL - monthly -  9am - 3pm     MR2                                                                                 
Cumbernauld Action for Care of the Elderly 10am - 3pm
Community Room
CIIL Bi-weekly 3pm - 4pm   Community Room
Community Policy Drop in  - monthly (530-7pm Conference
Room)                                                                                                                 
ACM childrens football 5pm - 7pm Gym Hall
2nd Clyde Scout Group, gym hall, 5pm - 7pm Gym Hall Tackling poverty (meeting room 1, 8.30m-4.30pm)
CIIL Donna McCann MR1, 12.30pm - 4pm
Community Health Walk and social - community room - 930-1230
Families Here and Now Service (meeting room 2 11am-2pm)
Families Here and Now service (Conference Room 230pm-430pm)
Project 42 Music
and Arts
programme
sessions 1.30pm -
3.30pm Social
dining and Hellar
Up
Appointments in treatment rooms based on a scheduled
programme/self referrals for: addiction and rehab services,
anticoagulant, CAMHS Neuro, child immunisation, midwifery,
phlebotomy, physio, podiatry, psychological therapy, speech and
language therapy
Appointments in treatment rooms based on a scheduled
programme/self referrals for: addiction and rehab services,
anticoagulant, CAMHS Neuro, child immunisation, midwifery,
phlebotomy, physio, podiatry, psychological therapy, speech and
language therapy
Appointments in treatment rooms based on a scheduled
programme/self referrals for: addiction and rehab services,
anticoagulant, CAMHS Neuro, child immunisation, midwifery,
phlebotomy, physio, podiatry, psychological therapy, speech
and language therapy
Appointments in treatment rooms based on a scheduled
programme/self referrals for: addiction and rehab services,
anticoagulant, CAMHS Neuro, child immunisation, midwifery,
phlebotomy, physio, podiatry, psychological therapy, speech
and language therapy
Appointments in treatment rooms based on a scheduled programme/self
referrals for: addiction and rehab services, anticoagulant, CAMHS Neuro,
child immunisation, midwifery, phlebotomy, physio, podiatry, psychological
therapy, speech and language therapy
C Card 830am to 445pm C Card 830am to 445pm
Sexual Health Clinic 1pm-4pm appt only
Young people clinic drop in or walk in 4pm-6pm registration 4-
5pm
C Card 830am to 445pm C Card 830am to 445pm C Card 830am to 415pm
Colour legend= Commissioned/thirs sector/community groups Council / Partner NHS services
Chryston (including
Chryston Health clinic
services)
Note: In each hub during the day the spaces available for service and partner delivery are 2 meeting rooms and 1 conference/community room, supplemented with the staff/partnership area for staff to use. 
As the report and analysis highlights there is room to optimise the use of other spaces beyond the school day which will be the focus moving forward as a deeper understanding of needs develops and to maximise occupancy and support local organisations to deliver against the LOIP's
The timetable is subject to change based on the needs of communties and adjustments to service delivery as new ways of working are trialled and impact measured.         
Targeted events and activity led by education will be added over Q3 and Q4 as this is planned and understood.
Page 116 of 216

Page 117

1
APPENDIX 5 – Impact frameworks for each hub 
RIVERBANK COMMUNITY HUB 
IMPACT FRAMEWORK 
JAN 2025 to JUNE 2025
Page 117 of 216

Page 118

2
Overview 
This report presents a six-month evaluation (January–June 2025) of the hub operating
model, focusing on stakeholder engagement and the return on investment in hub offerings.
It supports the transition to a future model by helping us understand and communicate the
broader value created through shared, no-cost hub spaces. The report covers Riverbank
community hub in Coatbridge.    
Developed in collaboration with hub stakeholders, the report combines service data with lived
experience to assess outcomes and highlight meaningful change 
Case studies include: 
• An overview of each service and its goals 
• Bookings data showing usage, cost savings, and cost avoidance 
• Quantitative data (e.g. drop-ins, appointments, phone calls) 
• Qualitative insights from stakeholders and service users 
All work in this framework is guided by the plan for North Lanarkshire, seeking to impact
on one or more of the 28 health check indicators and local outcome improvement priorities.
Both noted below for reference: 
Plan for NL: 28 Health check indicators 
LOIPs for Coatbridge: POVERTY  l  MENTAL HEALTH  l  DIGITAL INCLUSION    Page 118 of 216

Page 119

3 
Cost avoided by services based on the terms with the approved MOU for free use of space 
Month Monthly cost avoided across all services through hub MoU
Jan-25 £1,242.00
Feb-25 £850.50
Mar-25 £834.00
Apr-25 £2,505.00
May-25 £2,688.00
June-25 £3,034.50
Total sum £10,694.25 
Key Insights 
• Over six months the combined total of cost avoided is £10,694.25 across services -
see graph below.
• June was 145% higher than January, reflecting increased hub usage and service
delivery
• The upward trend highlights the growing value of the hub model as more services engage,
and footfall increases 
Page 119 of 216

Page 120

4
List of regular services using the Hub 
North Lanarkshire Council Services
• Tackling Poverty Team
• Active NL
• Community Learning & Development (Youth Work)
• Community Learning & Development (Drumpark FL)
• Community Partnership Team
• Education
• Tenant Participation
• Family Engagement 
NHS services 
• NHS Psychological Service (Stress Control) 6-week programme
• NHS Perinatal Mental Health (Finding Me) 8-week programme
• NHS Perinatal Mental Health (Circle of Security) 8-week programme 
Commissioned, third sector or ALEO Services
• Families Here & Now
• Home Start
• Carers Together
• North Lanarkshire Disability Forum
• Routes to Work
• Child Bereavement UK
• VANL
• NHS Quit Your Way
• NHS Maternal and Infant Nutrition 
Clubs (Gym Hall)
• Bushido Karate
• ASN Stars Football North Lanarkshire 
Case studies on the following pages 
Page 120 of 216

Page 121

5 
Riverbank Community Hub Case Study – NHS Psychological Service 
Stress Control has a well-established evidence base in helping people to overcome day-to-day
stress, low mood and anxiety, and offering the course at Riverbank Community Hub allowed us to
reach out to the community of Coatbridge to invite them to attend.  This invitation was also extended
to people who work in the area, as there are no barriers to accessing the course. 
For those who completed the end of course feedback, 50% rated their ability to manage their stress
as “good” or “very good” at the end of the course, compared with 7% rating their ability to manage
stress as “good” at the start of the course, and 0% of participants rating “very good”. At the end of
the course, 36% of participants rated their abilities as “neutral” and 14% rated “fair.” No participants
rated their ability as “poor” by the end of the course compared with 57% of participants at the start
of the course who rated their ability to manage stress as “poor.” 
The NHS Psychological Service had 23 attendees at Riverbank complete their outcome measures. 
SROI Element Details
Inputs NHS funded service, psychological service staff time and resources, use of
space in the hub, partnership with hub team and other co-located services
Outputs 13-23 participants at each session over a 6-week programme
Outcomes Self-management support provided to people experiencing a range of common
mental health difficulties such as anxiety and depression. Improved physical
health. Enhanced mental and emotional wellbeing. Increased productivity and
focus. Strong relationships. 
Financial
Proxy*
Avg. cost of psychological service appointment in North Lanarkshire: £33.33
(NHS Band 6)
Cost
avoidance
£81 total through free use of hub space
Equates to £13.50 per session delivered
Impact
Example
Free access to stress control support and information tools required to manage
anxiety and depression.
Reinvestment Increased additionality of service across North Lanarkshire, improved patient
access, prevent a need to access other services, improved self-management of
individual health and wellbeing to improve health outcomes.
*Financial proxy at this stage is based on salary costs of staff. More work will be done in phase 2 development to look at
monetary values assigned to outcomes to quantify their social, economic or environmental value. 
Participant feedback:
"I really enjoyed the course, and I definitely benefitted from what I've learned. I find myself telling my
family about all the different tools as well! Practicing relaxation and stepping out my comfort zone
has helped me. I feel I am anxious less and have more confidence in my ability to do hard things.
The way each session has been presented has been brilliant”.   
Page 121 of 216

Page 122

6
Riverbank Community Hub Case Study– Tackling Poverty 
We have found that the more local people hear about the Riverbank Hub the more inclined they are
to take up our offer of a face-to-face appointment rather than a telephone appointment. It is a great
facility in terms of accessibility as a lot of the people we work with have health conditions and
disabilities, often with limited mobility, so the accessible ground floor access for the appointment
room and toilet facilities is key. We have arranged face to face appointments in the hub and carried
out numerous phone calls when based out of the hub as part of our day-to-day service delivery. 
SROI Element Details
Inputs Council funded service, staff time and resources, appointments offered using
space at the hub, provision of advice relating to Welfare Benefits, Income
Maximisation and Debt Advice, partnership with hub team and other co-
located services
Outputs 31 face to face appointments to date held at the hub.
Outcomes Operational efficiency, ability to offer local appointments to residents, a more
responsive and flexible service, timely advice is given to individuals to fully
maximise their income.
Financial
Proxy*
Avg. cost of Tackling Poverty appointment with an officer in North
Lanarkshire: £24.49 (NLC10 £44,581)
Cost
avoidance
£438.75 total through free use of hub space
Equates to £14.15 per face-to-face appointment
Impact
Example
Support team capacity to provide pre booked appointments once per week
to residents and provide guidance and support with completing disability
application forms and applying for other benefits such as Universal Credit,
Pension Credit and Council Tax Reduction
Reinvestment Increased additionality of service across North Lanarkshire, improved reach
and access within communities
*Financial proxy at this stage is based on salary costs of staff. More work will be done in phase 2 development to look at
monetary values assigned to outcomes to quantify their social, economic or environmental value. 
Service example:
“A couple in their 80’s was referred by Social Work after one of them was diagnosed with dementia.
They wanted to maximise their income to employ a private cleaner to support with the household
chores that were becoming too hard. They were offered a benefit check over the phone to save
them having to travel but did not feeling comfortable discussing their finances over the phone. They
chose to come in for an appointment at their local hub to have a benefit check carried out. The
referral from Social Work had stated that they had no benefits in place but after carrying out the
benefit check and checking their income via bank statements it was confirmed that high-rate
Attendance Allowance was already in place for the person with dementia. They weren’t entitled to
any further benefits due to their income and savings but advised of a possible 25% discount on their
Council Tax due to recent the dementia diagnosis for one of them. They had to confirm no one else
lived in the house with them and took a form to their GP to get this certified. By doing so they were
liable to receive a 25% reduction in their bill saving £500 over the year”. 
Page 122 of 216

Page 123

7
Riverbank Community Hub Case Study– Families Here and Now Service (FHANS) 
Families here and know service is a partnership between Action for Children, Barnardo’s, Home
Start NL and Impact Arts. We have a referral process which makes the service accessible to all you
need it. The group sessions over the holiday periods have seen a significant increase as FHANS
grows and develops within the hub. 
SROI Element Details
Inputs Offering early help to families across North Lanarkshire, funds to commission
the services, staff expertise, time and resources, use of hub spaces,
partnership with hub staff and other co-located services. 
Outputs Since July, 69 people (24 adults and 45 young people) have attended
Riverbank Hub to participate in community arts and crafts sessions with whole
family support service offering early interventions.
Outcomes Across interventions overall; Improved family wellbeing by increasing financial
stability, strengthening family relationships, enhancing children's learning, and
improving their mental and physical health.
Financial
Proxy*
Avg. cost of FHANS appointment with a worker in North Lanarkshire: c.£11.22
(£25,910)
Cost
avoidance
£2308.50 total through free use of hub space 
Equates to £33.46 per face-to-face interaction
Impact
example
Building FHANS capacity to deliver 365 days a year and provide a local drop-
in service every Friday with free group activities to the community over school
holiday periods and weekends. 
Reinvestment Increased additionality of service across North Lanarkshire, improved
resources to increase variety of delivery and supporting activies. 
*Financial proxy at this stage is based on salary costs of staff. More work will be done in phase 2 development to look at
monetary values assigned to outcomes to quantify their social, economic or environmental value. 
Service feedback:
FHANS community drop-in group, over the summer holidays, had several families who spoke about
enjoying the groups; this was primarily due to the service being free of charge and snacks were
provided each week. Families fed back that they enjoyed spending time with their children and the
activities were fun and something they could replicate at home. One parent spoke about feeling
relaxed in the hub setting with FHANS staff there to support. One child made a dream catcher which
they said would catch all their dreams. The hub enables FHANS to reach families locally, help
improve parenting skills, and through an inclusive environment where parents, carers and young
people can take part improves mental and physical health for all family members. 
Page 123 of 216

Page 124

8 
N WMAINS & ST BRIGID’S
COMMUNITY HUB 
IMPACT FRAMEWORK 
JAN 2025 to JUNE 2025 
Page 124 of 216

Page 125

9
Overview 
This report presents a six-month evaluation (January–June 2025) of the hub operating
model, focusing on stakeholder engagement and the return on investment in hub offerings.
It supports the transition to a future model by helping us understand and communicate the
broader value created through shared, no-cost hub spaces. The report covers Newmains
& St Brigid’s community hub in Coatbridge.    
Developed in collaboration with hub stakeholders, the report combines service data with lived
experience to assess outcomes and highlight meaningful change 
Case studies include: 
• An overview of each service and its goals 
• Bookings data showing usage, cost savings, and cost avoidance 
• Quantitative data (e.g. drop-ins, appointments, phone calls) 
• Qualitative insights from stakeholders and service users  
All work in this framework is guided by the plan for North Lanarkshire, seeking to impact
on one or more of the 28 health check indicators and local outcome improvement priorities.
Both noted below for reference: 
Plan for NL: 28 Health check indicators 
LOIPs for Wishaw: TACKLING POVERTY & INEQUALITIES l  MENTAL HEALTH &
WELLBEING  l  DIGITAL INCLUSION l COMMUNITY SAFETY l COMMUNITY
ENGAGEMENT  l  ENVIRONMENT   Page 125 of 216

Page 126

10
Cost avoided by services based on the terms with the approved MOU for free use of space 
Month Monthly cost avoided across all services through hub MoU
Jan-25 £722.00 
Feb-25 £931.25 
Mar-25 £1,441.50 
Apr-25 £1,773.00 
May-25 £2,688.00 
June-25 £ 2,206.50
Sum £9,762.25 
Key Insights 
• Over the 6-month reporting period the combined total of cost avoided is £9,762.25 across
services – see graph below.
• May & June costs were >100% higher than January, reflecting increased hub usage and
service delivery.
• The upward trend highlights the growing value of the hub model as more services engage,
and footfall increases. 
Page 126 of 216

Page 127

11
List of regular services using the Hub 
North Lanarkshire Council Services 
• Active NL
• Community Learning & Development 
• Digital Services
• Education
• Housing
• Tackling Poverty Team 
NHS Services
• Health Improvement 
• Mental Health Team 
• Primary Care Occupational Therapy 
• Rheumatology Service
• Veterans First Point (V1P) 
Commissioned, third sector or ALEO Services
• Carers Together
• Families Here & Now 
• North Lanarkshire Disability Forum 
• Routes to Work 
Case studies on the following pages 
Page 127 of 216

Page 128

12
NHS Primary Care Occupational Therapy 
Primary Care Occupational Therapy supports early intervention for individuals experiencing
challenges with daily activities due to physical or mental health conditions. By offering timely, local
appointments through the hub, the service helps people maintain independence and reduce reliance
on more intensive health services.
Using the hub has enabled Primary Care OT to deliver timely, localised care while avoiding £238.50
in space costs that is proportionate with improved patient outcomes and increased service capacity. 
SROI Element Details
Inputs NHS funded service, OT staff time and resources, use of hub space,
partnership with hub staff and other co-located services  
Outputs 13 patient contacts (face-to-face and phone) from across multiple GP practices  
Outcomes Improved self-management, reduced GP visits, increased independence  
Financial
Proxy*
Avg. cost of OT appointment in NL: £33.33 (NHS Band 6)
Cost
avoidance
£238.50 total through free use of hub space 
Equates to £18.30 per appointment  
Impact
example
Arthritis patient seen locally, more responsible as seen within 8 days, received
tailored support for self-management  
Reinvestment Freeing-up GP space, increasing OT capacity, improving patient access  
*Financial proxy at this stage is based on salary costs of staff. More work will be done in phase 2 development to look at
monetary values assigned to outcomes to quantify their social, economic or environmental value.
Service feedback
“A patient with arthritis was referred to OT and seen within 8 days at the Newmains Community Hub.
The hub’s availability enabled faster access and avoided delays due to GP space constraints. The
patient received tailored exercises and strategies to adapt daily activities, helping them maintain
independence. This timely intervention was only possible due to the flexibility offered by the hub.” –
Ross, Specialist OT NHS Lanarkshire         
Page 128 of 216

Page 129

13
NHS Rheumatology Occupational Therapy Service - Fatigue Management Course
The Rheumatology Occupational Therapy service supports individuals with long-term
rheumatological conditions to overcome challenges in everyday activities, with a focus on managing
fatigue—a symptom that affects both physical and mental functioning. By delivering a 5-week fatigue
management group at the Newmains Community Hub, patients received timely, localised support
that reduced barriers to participation compared to hospital-based sessions. The hub’s inclusive
design and welcoming environment created a safe space for learning and peer connection. A follow-
up session in September reinforced key strategies and sustained engagement. Staff and service
users reported a positive experience, with the venue’s accessibility, layout, and comfort contributing
to improved wellbeing and reduced reliance on more intensive services.
SROI Element Details
Inputs NHS funded service, Specialist OT staff time and resources, use of hub space, 
partnership with hub staff and other co-located services
Outputs 6 patient contacts through group-based fatigue management sessions 
Outcomes Improved energy management, reduced reliance on GP appointments,
increased confidence in daily routines
Financial
Proxy*
Avg. cost of OT group session: £166.65 (based on NHS Band 6 group delivery)  
Cost
avoidance
£135 total through free use of hub space 
Equates to £22.50 saved per session
Impact
example
Case study: patient with long-term fatigue learned pacing strategies and
reported improved ability to manage work and home life 
Reinvestment Reduced demand on primary care, improved patient self-management,
enhanced group-based service delivery capacity. Delivery of community-based
support.  
*Financial proxy at this stage is based on salary costs of staff. More work will be done in phase 2 development to look at
monetary values assigned to outcomes to quantify their social, economic or environmental value.
Service feedback
The patient was referred in May 2024 by the Consultant Rheumatologist due to chronic fatigue. 3
one to one face-to-face sessions took place initially. Patient was advised to apply for Adult Disability
Payment and discussed ways to make daily tasks easier. The topic of fatigue and its management
was introduced. Protecting her joints and the benefit of hand exercises was discussed to improve
strength in her fingers. She was fitted/supplied with a right thumb splint which appeared to give relief
to her thumb pain. By her third and final appointment, in January 2025, she was implementing
strategies to help support her health and wellbeing and it was agreed that she would now benefit
from participating in the group Fatigue Management Programme. 
Patient attended all 5 sessions in the Newmains Hub and gave complimentary feedback on Care
Opinion (which she did not mind being attributed to her):   “I have found this course to be extremely
helpful. I have finally understood "pacing myself". I have found myself thinking over what was
discussed in class and I have managed to cope with my feelings and thoughts more constructively
and I now appreciate how feelings can contribute to pain and fatigue. I feel Jacqui and Lesley have
been fantastic facilitators and have shown excellent professional support and advice. Our group
have now developed a very good supportive friendship, and we are sad the course only lasted a few
weeks. We are very much looking forward to following up session and to share how we have all
progressed on our journeys. I am extremely grateful to Dr X and his team for the excellent treatment
and support I have received”. 
At the follow-up session 10 weeks afterwards, she told me that members have met up themselves
in the interim and are planning their next get-together.  Page 129 of 216

Page 130

14
NHS Veterans First Point (V1P)
Veterans First Point is a mental health and wellbeing service supporting veterans across
Lanarkshire. By offering a dedicated, no-cost space for internal meetings, the hub has indirectly
improved care planning, strengthened team collaboration, and supported the development of more
accessible and trauma-informed services for veterans.
Using the hub has enabled NHS Lanarkshire’s Veterans First Point service to hold regular team and
service development meetings.
SROI Element Details
Inputs Financial funding of the service, V1P staff time and resources, use of hub
space, partnership with hub staff and other co-located services 
Outputs 10 weekly team meetings and 3 monthly service development sessions
Outcomes Improved multidisciplinary planning, enhanced trauma-informed practice,
better service access, strengthened team cohesion
Financial
Proxy*
Peer support worker hourly rate c.£14.10 per hour
Cost avoided £175.50 total through free use of hub space
Equates to £13.50 per meeting
Impact
Example
Hub enabled in-person collaboration to improve service access and trauma-
informed care for veterans
Reinvestment Improved care planning, enhanced service delivery, better outcomes for
veterans across Lanarkshire
*Financial proxy at this stage is based on salary costs of staff. More work will be done in phase 2 development to look at
monetary values assigned to outcomes to quantify their social, economic or environmental value. 
Service feedback
“The hub has indirectly benefitted veterans in Lanarkshire by offering us a dedicated space for our
team to discuss cases, develop multidisciplinary care plans and opportunities for joint working.  It
has also enabled us to spend time considering key aspects of service development, including how
to improve access to the service and how to improve aspects of our attachment and trauma-informed
practice.  We do not have dedicated administrative or meeting space within NHS premises, so we
are hugely grateful for these opportunities to come together in person and improve care and support
for veterans living in Lanarkshire.” – Dr Abi McGinley - Consultant Clinical Psychologist  
Page 130 of 216

Page 131

15 
CHRYSTON COMMUNITY HUB 
IMPACT FRAMEWORK 
JAN 2025 to JUNE 2025 
Page 131 of 216

Page 132

16
Overview 
This report presents a six-month evaluation (January–June 2025) of the hub operating
model, focusing on stakeholder engagement and the return on investment in hub offerings.
It supports the transition to a future model by helping us understand and communicate the
broader value created through shared, no-cost hub spaces. The report covers Chryston
community hub.    
Developed in collaboration with hub stakeholders, the report combines service data with lived
experience to assess outcomes and highlight meaningful change 
Case studies include: 
• An overview of each service and its goals 
• Bookings data showing usage, cost savings, and cost avoidance 
• Quantitative data (e.g. drop-ins, appointments, phone calls) 
• Qualitative insights from stakeholders and service users 
All work in this framework is guided by the plan for North Lanarkshire, seeking to impact
on one or more of the 28 health check indicators and local outcome improvement priorities.
Both noted below for reference: 
Plan for NL: 28 Health check indicators 
LOIPs for Northern Corridor: CHILDREN & YOUNG PEOPLE l  HEALTH INEQUALITIES l 
COMMUNITY TRANSPORT l SOCIAL INTEGRATION & INCLUSION l BUILDING LOCAL
RELATIONSHIPS, TRUST & COMMUNICATION  l  MOODIESBURN WEST  Page 132 of 216

Page 133

17
Cost avoided by services based on the terms with the approved MOU for free use of space 
Month Monthly costs avoided across all services through hub MoU
Jan-25  £                                                                                                                 201.75 
Feb-25  £                                                                                                                   334.50 
Mar-25  £                                                                                                               690.75 
Apr-25  £                                                                                                               703.50 
May-25  £                                                                                                               1423.50 
June-25  £                                                                                                1769.25
Sum  £                                                                                                               5,123.25 
Key Insights
• Over six months the combined total of cost avoided across services is £5123.25 – see graph
below. 
• May & June savings were inordinately higher (>500%) than January & February, reflecting
increased hub usage and service delivery.
• The upward trend highlights the growing value of the hub model as more services engage,
and footfall increases. 
£201.75
£334.50
£690.75 £703.50
£1,423.50
£1,769.25
£0.00
£200.00
£400.00
£600.00
£800.00
£1,000.00
£1,200.00
£1,400.00
£1,600.00
£1,800.00
£2,000.00
Jan-25 Feb-25 Mar-25 Apr-25 May-25 June-25
Page 133 of 216

Page 134

18
List of regular services using the Hub 
North Lanarkshire Council Services 
• Tackling Poverty Team 
• Housing 
• Active NL 
• Community Learning & Development 
• GIRFE Focus Group 
• Education 
• Children Families and Kinship Support 
• Digital Services
• CLD 
NHS Services and UH&SCP NL 
• Mental Health Team 
• Occupational Therapy
• Psychological Services 
• Veterans First Point 
• Health Improvement 
• Breast screening Services
• Homecare services 
Commissioned Services, third sector or ALEO 
• Families Here & Now 
• Carers Together 
• North Lanarkshire Disability Forum 
• Routes to Work
• VANL 
• Community Police
• Project 42 Music & Arts
• ASNding Stars
• Northern Corridor Volunteers (Community Health Walk) 
Case studies on the following pages 
Page 134 of 216

Page 135

19
Chryston Community Hub Case Study– Tackling Poverty 
The Hub has enabled the Tackling Poverty Team to offer weekly, pre-booked face to face
appointments to residents who are seeking advice and support in relation to Welfare Benefits, 
Income Maximisation and Debt Advice. 
SROI Element Details
Inputs Council funded service, staff time and resources, appointments offered
using space at the hub, provision of advice relating to Welfare Benefits,
Income Maximisation and Debt Advice, partnership with hub team and other
co-located services
Outputs 18 individual contacts to date (face-to-face) and numerous phone calls as
part of day-to-day service delivery from the Hub
Outcomes Operational efficiency, ability to offer local appointments to residents, a
more responsive and flexible service, timely advice is given to individuals to
fully maximise their income.
Financial
Proxy*
Avg. cost of engagement with TPT Co-ordinator post: £24.50 (NLC 10) per
hr.
Cost
avoidance
£582.50 total through free hub use of spaces
Equates to £32.36 per face-to-face appointment (excl. phone contacts)
Impact
Example
Support team capacity to provide pre booked appointments once per week
to residents and provide guidance and support with completing disability
application forms and applying for other benefits such as Universal Credit,
Pension Credit and Council Tax Reduction
Reinvestment Increased additionality of service across North Lanarkshire, improved reach
and access within communities
*Financial proxy at this stage is based on salary costs of staff. More work will be done in phase 2 development to look at
monetary values assigned to outcomes to quantify their social, economic or environmental value.
Service feedback:
Hub appointments are increasing as local visibility increases. Face to face appointment rather than
a telephone appointments are increasingly popular. Hub meeting room offers privacy and
confidentiality.  In terms of accessibility  -  many people TPT work with have health conditions and
disabilities - the  accessible ground floor access and ASN toilet facility has been key. Staff can also
access suitable NLC systems required from the hub.
Case study:
‘Young man seeking support - really struggling financially - after losing his job. Worried about
affording rent and council tax bills. Renting from North Lanarkshire Council and living alone.
Overwhelmed when discussing his finances over the phone and asked for a face-to-face
appointment rather than a telephone appointment - arranged at Chryston hub within two weeks. Met
with income maximiser; full benefit check carried out. Identified that whilst in receipt of relevant
income-based benefit, namely Universal Credit, was not getting any help with council tax . Only
accessing partial help with rent award due to having spare bedroom. Income maximiser completed
council tax reduction application and discretionary housing payment application form. Applications
submitted on day of appointment. Applications processed and awarded within 6 weeks, reducing
outgoings by £200 per month. Not only was this a financial gain but it was also a gain in terms of
alleviating the stress he was under about re affording rent and council tax, whilst looking for a new
job after losing job unexpectedly.   Page 135 of 216

Page 136

20
Chryston Community hub – Carers together case study
North Lanarkshire Carers Together provides information to unpaid carers to assist them in their
caring role. CT signpost to other services and provide information about any relevant services
available throughout the area. CT also inform unpaid Carers about their rights and encourage Carers
to share their stories and challenge the barriers they may face through CT’s Forum work. 
Using the hub has enabled Carers Together (CT) to deliver support to unpaid carers closer to where
they live. The team also use the hub spaces to hold team meetings and plan work.
SROI Element Details
Inputs Funds to commission the services, staff expertise, time and resources, use of
hub spaces, partnership with hub staff and other co-located services. 
Outputs 19 individual contacts to date, along with links made with 19 local service
providers locally.
Outcomes Improved reach and accessibility for local people. 
Improved multidisciplinary planning, enhanced trauma-informed practice,
strengthened team cohesion. Cost reduction for service relative to property
costs enabling funds to be redirected to other aspects of service delivery.
Financial
Proxy*
Average cost of engagement with Carer Information and Engagement Worker
£16.13 per hr.
Cost
avoidance
£853.33 total through free use of hub spaces
Equates to £44.91 per individual contact 
Impact
Example
Hub enabled in-person collaboration to improve service access and trauma-
informed care and support – Case Study (below).
Reinvestment Improved care planning, support, and signposting. Enhanced service delivery,
better outcomes for carers across Lanarkshire.
*Financial proxy at this stage is based on salary costs of staff. More work will be done in phase 2 development to look at
monetary values assigned to outcomes to quantify their social, economic or environmental value. 
Carers Together Support Worker testimonial:
‘People tell us they feel welcome coming into the hubs and have commented about the convenience
for them as they would have to come in to meet us in Motherwell or Cumbernauld previously.  
Having a presence at events within the school has been helpful linking in with parents. 
We have also facilitated some of our team meetings and our annual Carers Conference in November
at Chryston hub. We have quite literally outgrown our office premises, so the hub has been
invaluable.
In addition to this we have presented at the hub Community Board Meetings and the Hub Network
meeting in August, arranged by Hub coordinator where there were between 40+ other professionals
in attendance. This was an excellent day of information sharing and networking with other Hub
services’.
See next page for carer case study- 
Page 136 of 216

Page 137

21 
Carer case study: 
Page 137 of 216

Page 138

22
Chryston Community Hub – NL Disability Forum and MacMillan Cancer (NLDF) 
Using the hub has enabled NLDF to deliver various localised care and support services since
operating from the hub in March 2025. Appointments are held 2 days per month. Through the
Improving Lives Initiative (ILI) and the Improving the Cancer Journey (ICJ) with Macmillan
programme NLDF Community Connectors work with those with disabilities, long-term conditions
and those affected by cancer to support by signposting, information sharing, connecting with
organisations and groups in the community and liaising with statutory services where needed.
NLDF have been able to offer face to face appointments within the hub, providing a convenient
location for people to seek advice in relation to form filling. attending meetings and appointments
and to support the person to understand and to have their voice heard, linking them in with advocacy
services where needed.
SROI Element Details
Inputs Funds to commission the services, staff expertise, time and resources, use of
hub spaces, partnership with hub staff and other co-located services.
Outputs 16 individual contacts to date (face-to-face) and numerous daily phone calls
relating to local support
Outcomes Improved accessibility to the service including those challenged with disability.
Provision of bespoke and focussed disability and cancer related support.
Improved representation enhanced mental health and wellbeing, and resilience
through alleviating stress connected to related challenges and providing
emotional support. 
Financial
Proxy*
Avg. cost of engagement with NLDF Practitioner post: £15.40 per hour
Cost
avoidance
£332.80 total through free use of hub space
Equates to £20.80 per individual contact
Impact
Example
Support for decision making, enhanced health and wellbeing, reducing stress
and improving resilience.
Reinvestment NLDF service uses Hub for drop-in support. In addition, hub offers participant
appointments and interactions with other services. Hub used weekly for clients
who live local to access support, which is more convenient than need for people
to attend appointments in Motherwell. Other Hub services signpost to NLDF
service which supports a collaborative one service approach.
*Financial proxy at this stage is based on salary costs of staff. More work will be done in phase 2 development to look at
monetary values assigned to outcomes to quantify their social, economic or environmental value.
NLDF service participant - Case Study:
C came to visit me at the hub as a drop in. C is in remission from Cancer but had concerns around
his health, feeling overall that he had been "left or overlooked" now that he was in remission. I
discussed with C a bit about our service and added him on as a referral to our service. I helped C to
contact his Clinical Nurse, who passed on the concerns to his Oncologist. I also helped C to obtain
a gym membership as he was looking to lose weight. C was happy with the outcome and stays local
to the hub and advised he saw a flyer for it in the community. If C did not come into the hub he may
still have concerns and worry about his health, but by coming into the hub these have been
alleviated.  
Page 138 of 216

Page 139

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref     LR/HL Date 04/12/25 
North Lanarkshire Half Marathon 
From  Lyall Rennie, Chief Officer (Community Operations)  
E-mail liddleh@northlan.gov.uk Telephone 07973 726496 
1. Background 
1.1 Following approval for delivery of a half-marathon within North Lanarkshire during
2025, a team of stakeholders led by Active & Creative Communities came together to
begin planning the event. Participating in the working group were: 
• Active & Creative Communities
• Roads and Assets Service
Executive Summary 
At the Communities Committee on 3 February 2025, approval was given to hold a half
marathon event in the Motherwell area on 25 August 2025.  This report provides an update
on the impact of the event, lessons learned and sets out a proposal to extend the event for
a further two years with a view to then assessing the long-term future of the event based
on the outcomes from the three previous events. An outline budget and proposals around
sponsorship options is included. 
Recommendations
It is recommended that Policy and Strategy Committee: 
(1) Approves the proposal for an annual half marathon event to be held in North
Lanarkshire for the next two years (2026 and 2027).  
(2) Acknowledges the projected costs, as outlined in table two.
(3) Notes that a further report will be brought back to Committee in December of 2027
with a proposal on the longer-term future of the event based on the outcomes of
the first three events. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (15) Encourage the health and wellbeing of people through a
range of social, cultural, and leisure activities
Programme of Work All Programmes of Work
Item 6
Page 139 of 216

Page 140

• Built Environment
• Corporate Communications
• Talent & Organisational Development
• Health & Social Care Partnership (North Lanarkshire)
• Hochtief (and sub-contractors Sign Safe)
• Police Scotland
• Scottish Ambulance Service
• Scottish Fire & Rescue 
Additional support was also provided by St. Andrews’ First Aid, G4S security, Active
Schools School Leaders and a number of volunteers working with the Volunteer NL
programme. 
1.2       Planning for the event was extremely complex, with significant engagement taking
place with partners for a period of six months in advance.  Most challenging was the
work required to establish the Traffic Management Order, and significant work was
undertaken with Hochtief, and their sub-contractors Sign-Safe, to ensure that all
potential risks were understood, and appropriate mitigation put in place.  We were
fortunate in that our sub-contractors had experience of running similar events in other
areas including Glasgow and Edinburgh and we were able to learn lessons from others. 
1.3 Ultimately, 1150 runners participated across the events – half marathon, 5k, 1k and
400m toddler dash.  A family fun zone attracted around 700 people.  Residents from
across North Lanarkshire Council participated in cheering the athletes as they passed
on route and several local businesses offered free water or deals for participants when
they presented their medal at the premises. 
1.4 Around half of all participants in the races came from the Motherwell area, but many
participants came from much further distances with runners travelling from Dundee,
Fort William, Inverurie, Oban, Poole and the Lake District. 
2. Report 
2.1.1 Event Impact and Success 
2.1.1 Highlights from the event included significant sponsorship for a range of local and
national charities.  NLC social media channels recorded over 243,000 views and
Freeview Corporate TV channel, “Thats TV” Glasgow, also conducted interviews with
staff to further celebrate the event’s success and broadcast the article on their channel.
A total of 100 runners signed up for the Cumbernauld 10k as a result of their positive
experience at the half marathon, giving the 10k the largest participation numbers since
the pre-pandemic period. 
2.1.2 The event had a significant positive impact on the local community, through its
extensive Family Fun Zone comprising of multi-sport activities, face painting and
bouncy castles, all made entirely free of charge to everyone attending. 
2.1.3 All efforts were made to maximise accessibility to the event, and it was recognised that
a potential barrier to participation could have been the cost of entry.  The event
management team conducted a comprehensive benchmarking exercise which ensured
the North Lanarkshire entry fees were less than other neighbouring authorities for
similar events across Scotland.  A reduced entry fee was also offered to council
employees and staff from Albert Bartlett. 
Page 140 of 216

Page 141

2.2 Lessons Learned 
2.2.1 Communication - Planning for road closures was undoubtedly the most challenging
aspect of the project with a significant period spent on the work associated with the
Temporary Traffic Management Plan (TTM).  The majority of discussions that were held
centred around the logistical and challenging task of attempting to establish a route for
the event. Through a series of early discussions with many internal departmental
sections including Roads and Assets, the route was continually modified with several
key aspects taken into consideration, including: 
• Avoiding impact on University Hospital Wishaw.
• Avoiding major road arteries and junctions such as Airbles Road and Wishaw
main street.
• Minimising impact on public transport services operating on the day. 
2.2.2 As a result of the difficulties in finalising the TTM, we were only able to begin
communicating with residents, businesses and places of worship around 3 weeks in
advance of the event.  Should a decision be made to hold the half marathon in 2026
and 2027, we would begin communication earlier and tailor the advice given for specific
areas to attempt to answer questions around access in advance.  By beginning the
communication exercise earlier and tailoring the information we provide, this will
provide information well in advance of the event and avoid a repeat of the concerns
that were expressed by the local community, places of worship etc which were received
in the weeks immediately before the event. 
2.2.3 Staffing – the half marathon was the biggest event of its kind held in North Lanarkshire. 
Although the ACC team have many years experience in running events, this was more
than double the size in terms of participants and the largest single rolling road closure. 
As a result, there was a great deal of nervousness from partners and as a result, the
staffing complement from partners in Police Scotland and Scottish Fire & Rescue
(which the council was required to pay for) was, in reality, more than was necessary. 
Similarly, the security provided by G4S was more than was needed on the day.  Further
discussions are needed, but we would expect that our experience of running the event
will allow us to reduce staffing levels next year, albeit remaining within safe levels. 
Should the event be repeated, we will continue to work with all partners to ensure all
aspects of the event are appropriately managed. 
2.3 2025 Spend and Projected Budget 
2.3.1 Using experience of costs associated with the Cumbernauld 10k, we originally
estimated the cost of the event could be delivered within a budget of £60,000. 
Unfortunately, due to higher than anticipated costs of the TTM and additional staffing
as outlined above, the total spend (minus income from runners and sponsorship) was
£139,131.  This is detailed below: 
Table 1 - 2025 Spend 
£
Staffing Costs 16,560
Road Closure Order 66,676
Runners T Shirts and Medals 17,377
Letters to Community 23,605
Marketing/Advertising 4,893
G4S support 16,000
Page 141 of 216

Page 142

Signage (internal) 1,663
Police Scotland 8,901
Other 14,876
Total Expenditure £170,640
Income 
Runner entry fees £25,138
Sponsorship – Albert Bartlett 5000
Overall Spend £139,131 
2.3.2 In considering the experience of 2025 and our options for future events of this kind,
there are a number of options which we feel could improve the experience for
participants and the wider community whilst at the same time reducing the overall cost. 
Our proposed budget is outlined below, but for additional context: 
Staffing 
In addition to the valuable support from colleagues and partners, the half marathon was
very much a team effort from ACC, with many officers removed from their main duties
to cover responsibilities associated with the event.  In order to do this, we were required
to backfill roles with casual staff.  We also had to increase our casual workforce in the
two weeks leading up to the event to deal with the complaints and queries coming from
residents and churches.  To some extent, we hope that changes to what/how we
communicate and when, will help to alleviate some of this pressure in future years.   
Sponsorship 
For the 2025 event, we were fortunate to receive £5000 funding from Albert Bartlett. 
However, as a result of the success of the event, we have since been contacted by
both Specsavers and Scottish Power who have asked to be involved in supporting a
future half marathon.  We anticipate that there is significant scope for more local
investment and would propose that we work with local businesses to increase
sponsorship options.  We also intend to explore the community benefit options,
certainly with Hochtief, but with other contractors.  We will work with colleagues to
consider all options for support. 
Participation Numbers 
Participation numbers for the 2025 event were capped to allow us to gain experience
from the event and understand what may be possible should the half marathon be
repeated in future years.  If approval is given to repeat the event, we would anticipate
that participation numbers will be able to increase.  Similarly, entry costs were kept low
at £34.99 (for the half marathon) to encourage participation and promote accessibility. 
From benchmarking with similar events, we are significantly lower than other events of
this nature.  As such, we would propose increasing entry fees to £39.99 – which
remains lower than other events (Glasgow £44.99 and Edinburgh £49.00).  The
combined impact of increased entry fees and participation numbers will generate a
further £30,000 in income to support the event. 
2.3.3 On the basis of our experience this year, and the possibilities available to increase
sponsorship by focusing on the social value of such an event, a proposed budget for
the event is outlined in Table Two below. 
2.4 Financial Implications
Page 142 of 216

Page 143

It is the intention of the council to apply for funding from the National Events Programme
to support delivery of the Half Marathon. Led by VisitScotland, the fund supports the
strategic development of live public-facing sporting and cultural events in line with the
aims of the National Events Strategy, Scotland the Perfect Stage.  This fund (subject
to successful application) offers grants from £5,000-£25,000 and would further reduce
the proposed budget outlined in table two.   
Table 2 - Proposed Budget 
Expenditure £ Comment
Staffing Cost 9,800 Reduced as a result of previous
year experience and includes
spend on additional staffing
needed from agency partners.
Catering 250 
First Aid Provision 1000 
Venue Hire 2884.63 
Road Closure Order 65,217.80 
Medals 5,200 
Sports Therapists 0 This service was offered free of
charge from our partners who are
keen to offer practical learning
experience for students.
Fruit and water 1000 
H&C Events 1000 
Runners T Shirts and Staff
Uniform
5000 
Energy Gels 300 
Letters to Residents,
Business, Places of Worship
21,000 Reduced spend on letters as
propose to shorten with link to
website/QR code to find more
details on route impact. 
Telephone contact details will be
provided for anyone who wishes
to discuss.
Portaloos 1000 
Advertising/Marketing 500 
G4S Support 10,000 
Link Tel Communications 800 
Perfect Timings 2642.65 
Signage 1000 
Total £128,345.08 
Income  
Runner Entry Fees 55,000 
Sponsorship* 15,000 
Total Budget Commitment 58,345.08 
*Subject to successful application  
2.4.1 It is accepted that the budget as detailed above is subject to fulfilment of projected
sponsorship, external funding and numbers of participants. For this reason, the
recommendation to Committee is for agreement to proceed with a repeat of the event
for the next two years (2026 and 2027) and that a further report is brought back to
Committee in December of 2027 outlining a definitive financial position from the
Page 143 of 216

Page 144

previous three years of the event and with a recommendation as to whether the event
should be established as an ongoing annual event. 
2.4.2 The balancing costs associated with delivery of the event over the next two years will
be met from within the overall Community Operations budget, the first year of which
will include the £50,000 previously allocated to the fireworks event for 2026 which will
now no longer take place due to the ongoing refurbishment of the Watersports
Centre. 
3. Measures of success 
3.1  The council’s commitment to a successful community event, which supports health and
wellbeing, while offering a fun, participative opportunity for all.   
4. Supporting documentation 
No supporting documents. 
Lyall Rennie
Chief Officer (Community Operations) 
Page 144 of 216

Page 145

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Details are included within paragraph 2.4 above.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Initial discussions on the post have taken place with HR.  This will be finalised
subject to committee agreement to proceed. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Page 145 of 216

Page 146

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Subject to agreement to proceed, we will continue to work with colleagues in
Corporate Communications to promote the event. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All risks managed in line with ACC overall risk management plan. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
Page 146 of 216

Page 147

If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 147 of 216

Page 148

Page 148 of 216

Page 149

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref     JMcK/CMcC Date 04/12/25 
School Estate: Strategic Capital Update 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail McKinstryJ@northlan.gov.uk Telephone Via Teams 
Executive Summary 
This report outlines the progress and associated commentary for two key areas within the
school estate, both of which are key components of the Strategic Asset Review and
Investment Strategy (SARIS):   
The Town and Community Hub Programme – one of the council’s flagship programmes,
which provides new bespoke community assets. Each of these new hubs is arguably the
largest single infrastructure investment that will be made within the community they serve. 
The existing school estate – which still forms the majority of our overall school estate,
experiences challenges around the condition of the buildings, the suitability of the buildings,
and how we will manage excess capacity in the school estate over the coming decades. 
The report provides examples and updates for each of these two key themes, providing an
overview of the work, and associated rationale for the investments being made, and the
difference this makes to the local communities within which they are situated. 
It is concluded that the strategy remains effective, but that the level of funding available
changes the priorities – high levels of funding facilitate more new hubs, lower levels of
funding facilitate targeted investment in the existing estate.  As an example - £50m
investment could create one new large community hub, or multi-million-pound targeted
improvements in a number of existing schools (with potential to use them as hubs). 
Different types (and scale) of projects produce different economic and operational benefits
and, as such, a blended approach linked to the available finance is both the current and
future way forward. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Acknowledge the progress, and strategy linked to the Town and Community Hub
Programme and associated projects, providing multi-million investment within local
communities 
Item 7
Page 149 of 216

Page 150

1. Background 
New approach to the school estate – strategy adopted March 2020 
1.1 In March 2020, as part of the “One Place – One Plan” presentation - which outlined key
strategies and programmes to deliver the ambition within The Plan for North
Lanarkshire - Policy and Strategy Committee approved the Guiding Principles and
Prioritisation Matrix to inform the newly created Town and Community Hub Programme. 
1.2 In March 2021, £236m was allocated to the Hub Programme as part of the Strategic
Capital Investment Programme, 2021 – 2026. This funding was primarily for “legacy”
type projects to be delivered through this new hub programme. 
1.3 In September 2021, as part of “The Place, The Vision – Update” report, the Policy and
Strategy Committee were provided with a list of the “A1” priority projects – these being
the highest scoring projects, for new build, based on the prioritisation matrix agreed in
March 2020. 
1.4 In September 2022, Policy and Strategy Committee agreed to prioritise Chryston High
Extension for LEIP funding from Scottish Government, along with the new Gartcosh
Community Hub.  The council was successful in obtaining LEIP funding for the
Chryston High extension, but not the Gartcosh Community Hub project, which is being
delivered via council capital funding. 
Shift in financial outlook – following the global pandemic and world events 
1.5 Also at the September 2022 Policy and Strategy Committee, members were presented
with a report on the “impact of inflationary pressures” – which outlined the significant
inflationary challenges aligned to large scale capital projects, and the pressure this
placed on existing projects within the hub programme. 
1.6 In March 2023, a report titled “Abronhill Community Hub” (but which presented updates
on various projects) was presented to Policy and Strategy Committee, advising that,
due to increased costs across “legacy” and “capacity” projects, not all projects within
the programme could be brought forward at this time. 
Medium term change in strategy to react to financial outlook 
1.7 In December 2023, a report on “Strategic Asset Review and Investment Strategy
(SARIS)” was presented to Policy and Strategy Committee, reacting to the changing
financial landscape and increased construction costs.  This report argued that whilst
(2) Acknowledge the more targeted investment in the existing school estate -delivered
via the general capital fund, around areas of capacity, condition, and suitability.
(3) Recognise that a report will be submitted to the Policy and Strategy Committee, in
Cycle One 2026, to report on the way forward in relation to the Ravenscraig
Community Hub. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Transforming Places
Page 150 of 216

Page 151

the strategy of ‘centring community assets around the school estate’ maintained valid,
the financial outlook made it more difficult to deliver this through “new assets” alone
and made the argument for adapting the existing estate to deliver the ‘community hub’
elements for local communities as part of the strategy. 
1.8 In March 2024, an updated “Strategic Capital Investment Programme 2024 – 2029”
was presented to Policy and Strategy Committee.  This updated funding package
included £250m for investment in the Town and Community Hub Programme.  Whilst
this was primarily for the completion of already planned projects, there was money
included for consideration of new hubs in Glenboig (capacity), Abronhill (policy), and
Ravenscraig (eventually capacity, currently policy). 
Financial allocation for condition of existing buildings 
1.9 In September 2024, the “SARIS: Update Report” was presented to the Policy and
Strategy Committee, providing an overview of the ‘condition’ of the school estate – a
key core fact when assessing the adequacy of buildings. This report recommended that
tests of change and targeted investment projects be brought forward if funding became
available. 
1.10 In March 2025, at the Policy and Strategy Committee, a “Strategic Capital Investment
Programme 2024/25 to 2028/29” paper was presented and improved.  Within that
report, there was an additional £30m for targeted investment in the condition of the
existing school estate. 
2. Report 
Replacing schools in North Lanarkshire since 1996 
2.1 North Lanarkshire Council has a clear track record of replacing schools. Since the
creation of North Lanarkshire Council, in April 1996, over one third of the school estate
has been replaced. However, as outlined in the SARIS update report in September
2024, and below, there is still a significant amount of the school estate ‘pre-1996’. 
2.2 In November 2025, Orbiston Community Hub opened, replacing two schools, early
years provision, and an outdated community centre, with an all-electric, reduced
carbon, 21st century community asset for this community in Bellshill. This replaced two
1950s schools within the estate. 
2.3 Early in 2026, St Kevin’s Community Hub will open, to ensure adequate provision for
the growing population in the Bargeddie area, facilitating housing growth within this
local community. 
2.4 Further projects in Gartcosh, Sikeside (St Stephen’s) and Chryston will be completed
towards the end of 2026 and into 2027. 
Creating bespoke new assets: The hub programme 
2.5 The Town and Community Hub Programme, as a strategy, has three elements through
which it is delivered: 
2.5.1 (1) Identify the priority projects:  
The prioritisation matrix, as approved in March 2020, is used to identify which projects
would be delivered, in which order, should funding not be an issue.  However, it is clear
Page 151 of 216

Page 152

funding is and always will be an issue. Not all schools can be replaced at once – indeed,
with the current infrastructure costs for a new build, the size and scale of our larger
schools – a budget of £250m may only deliver one or two “town hub” sized projects, or
five to six “community hub” sized projects in a five-year period.  As outlined in previous
reports, the increased costs of delivering infrastructure projects both nationally and
internationally, has reduced the number of projects we can deliver with available
funding. The prioritisation matrix still accurately reflects the order of projects. 
2.5.2 (2) Design and build the new asset to meet the needs of the community  
The guiding principles, also approved in March 2020, outline the process of deciding
which facilities will be required in the hub.  Each hub is unique, with some offering
similar facilities to that of a traditional school (i.e. no daytime community provision).
This has caused some confusion – but a key guiding principle is to “maximise the
services on offer”, which is there to ensure we complement rather than compete with
other public and third sector organisations operating within the local area. 
2.5.3 (3) Introduce the ‘leadership and operating model’ for the hub  
The Leadership and Operating Model team work with the schools and the local
community to make best use of the new hub both during the day, and outwith the school
day.  A good example of this is the new St Kevin’s hub which will open in early 2026. 
There will be no “daytime provision” for the community within this hub as a community
room is already available within the existing joint campus. “Daytime users” are
signposted to these facilities for day bookings. The hub is primarily for the use of the
school during the day, but provides additional, and alternative spaces for the
community outwith the school day.  The operating model for each hub will therefore be
unique to the community it serves. 
“Core Facts” – National assessment of our school assets 
2.6 All councils must submit annual returns to Scottish Government on “core facts” which
all have national guidance attached to the assessment and recording of information.
The sections below look at these aspects from within the ‘core facts’ groupings that all
councils must assess and report on: 
• The sufficiency of the school estate – also known as ‘utilisation’, this measures how
‘full’ or ‘efficient’ schools are through recording the number of spaces (for pupils) being
used compared with the number of spaces available in any given school. 
• The condition of the school estate – which focusses on the fabric of the building, “wind
and watertight” etc. 
• The suitability of the school estate – how conducive the building is to modern day
learning and teaching, looking at environmental factors such as natural daylight,
outdoor spaces, etc. 
The core fact data assists officers target investment through the general capital plan,
approved by committee. 
New hubs and the ‘core facts’ 
2.7 Understandably, new build community hubs, with schools at the core, score well for
condition – they are new buildings.  Equally, they score well for suitability, as they have
been designed to meet the needs of learners in the modern setting.  Finally, roll
projections are examined when looking at the number of pupil spaces required, and
Page 152 of 216

Page 153

therefore the number of classrooms should match the longer-term needs of the local
population, thus matching the sufficiency/utilisation factor. 
New hubs: meeting the needs of housing growth 
2.8 Within the current hub programme, there are clear examples where hubs have been
brought forward to ensure capacity can match demand, matching the
sufficiency/utilisation factor.  In other words, ensure there are enough spaces for the
growing population, which is almost always because of housing growth in the area. 
Examples of these include: 
2.8.1 Chryston Community Hub – which is more than double the capacity of the previous
school, and which now also accommodates a new health clinic for this growing
population.  The previous Chryston Primary School required use of temporary modular
units over years to accommodate the growing population. The new hub has adequate
space for the increased population. The increased population is as a result of significant
new housing in this area - however the school population is anticipated to decline over
the coming decades. This has been factored into the design of the new hub, providing
an opportunity to ‘decouple’ a wing of the school, whilst allowing this space to be
repurposed for the needs of the local community at that time, once the school no longer
requires the space. 
2.8.2 Gartcosh Community Hub – Similar to the Chryston Community Hub, the housing
growth in this area necessitated the replacement of the existing school – as the existing
school site could not be adapted to adequately meet the needs of the growing
population. This hub will also include a new community hall, to replace the existing
older asset within this local community – providing modern and bespoke spaces for this
growing population. 
2.8.3 St Kevin’s Community Hub – This hub was brought forward to ensure that housing,
proposed through the last local development plan, could be accommodated whilst
ensuring there were enough spaces for the growing school populations. The existing
joint campus in the area provided an opportunity to adapt this to become a single, larger
school for the Bargeddie Primary School population, with the St Kevin’s school
community moving to a new facility, thus providing adequate spaces at both schools.
This approach will be replicated at Glenboig, to suit that growing population. 
2.8.4 Riverbank & St Stephen’s Community Hubs – These hubs were initially expected to
be a joint campus but again, to facilitate the demands for new housing land within this
local area, through the local development plan, the schools were separated into two
community hubs, with the Riverbank Community Hub now in operation and the St
Stephen’s Community Hub in construction.  These hubs, through separation, ensure
there is adequate school provision for all the proposed new housing, along with the
existing and established communities within this local area. 
New hubs: Prioritisation of projects 
2.9 As outlined in the SARIS reports presented to previous Policy and Strategy
Committees, there are three reasons for bringing forward new hubs: 
• Legacy – the hub project has been brought forward from a previous capital
programme and there is an expectation within both the council and the wider
community that the project should be completed. 
• Capacity – the projects listed in section 2.8 above, all demonstrate this type of
project, which are brought forward to meet anticipated demand within local
Page 153 of 216

Page 154

areas, generally to ensure that housing growth, through the local development
plan, can be accommodated. 
• Policy – projects which do not necessarily meet the capacity criteria but which
would benefit the local community through ‘place making’ which is a key theme
within The Plan for North Lanarkshire and the associated Transforming Places
programme of work. 
2.10 When demands are placed on budget allocations and projects must be prioritised, there
is a clear recognition that capacity related projects must take priority due to the needs
of local communities.  There will continue to be projects like these brought forward, as
local development plans are renewed and refreshed, and housing growth is promoted.
It is the responsibility of the teams across the council to ensure that there is a need
(through both planning and education terms), there is available finance to support the
inclusion of housing growth within the plan, and importantly, there is a solution (land)
in place or identified to accommodate the building of a new hub. 
New Hubs: Projects at pre-delivery stage 
2.11 Within the current capital programme, as discussed in section 1.8 above, there is
funding provided to progress three projects at Glenboig, Abronhill, and Ravenscraig.
Each of these projects is being brought forward for different reasons, and link in with
the three types of projects, outlined in section 2.9 above, in different ways. 
2.11.1 Glenboig Community Hub is a capacity related project.  Like neighbouring
communities in Gartcosh and Chryston, Glenboig is experiencing housing growth.  The
projects were brought forward in line with projected housebuilding in the area.  Chryston
houses were delivered first, and therefore the hub was delivered first.  The housing
land audit indicated that housing in Gartcosh would be brought forward faster than in
Glenboig, and therefore the Gartcosh Community Hub was prioritised ahead of the
Glenboig hub in the previous capital programme.  This project is now at the stage where
housebuilding is progressing and a new hub is required. Feasibility studies have been
concluded for this project and a procurement route is being worked through. 
2.11.2 Abronhill Community Hub is a policy related project.  This project was identified in a
previous capital plan, and statutory consultations and discussions with the local
community around this plan took place.  This is primarily a “place making” project,
providing new school and wider hub provisions on the old Abronhill High School site,
within the centre and ‘the heart’ of this local community.  As it was included within a
previous capital plan it is argued to be a legacy project – as the council and wider
community expect it to be delivered.  NHS Lanarkshire were previously involved in this
project and the previous designs included a ‘health zone’ within the hub. This project
was deferred from the previous capital programme due to increased costs within other
priority projects.  When revisited, NHS Lanarkshire were no longer in a position to
commit to the project which affected aspects of the design, including site access and is
therefore being reassessed.  Procurement routes and timescales for this project are
being reviewed at present. 
2.11.3 Ravenscraig Community Hub is a policy related project.  As outlined in the Capital
Investment Programme report – in March 2023 to Policy and Strategy Committee,
projects are subject to a review ahead of being brought forward. A review around this
project is being concluded and will be brought to the Policy and Strategy Committee in
a cycle one of 2026, detailing the next stages in relation to this project. 
2.11.4 Ravenscraig Community Hub: Previous Update 
Page 154 of 216

Page 155

At the Policy and Strategy Committee in December 2024, within the RAAC report
presented, it was agreed “that a future cultural offering will be fully considered as part
of the proposed Ravenscraig Hub”. It was also indicated within that report, that output
from design studies would be brought to committee in Cycle two of 2025. This report
was not presented at that time. It was deemed prudent to await the outcome of the
review linked to the wider hub proposals, including the discussions with Historic
Environment Scotland (HES) around the proposed demolition of the existing concert
hall. 
2.11.5 Ravenscraig Community Hub: Discussions with HES
Ahead of submitting an application for Listed Building Consent (LBC) to allow the
building’s demolition, the council has been working with consultants, Pick Everard, to
prepare feasibility and cost reports. These reports are intended to demonstrate the
conservation deficit as part of the justification for demolition. In developing these, the
consultants have assessed the entire structure, not just the RAAC elements, to
determine the scope of works required to bring the building back into viable use. 
At the same time, conservation consultants, MAST, have been preparing a
conservation report to support the LBC application and provide a reasoned case for
demolition. At the time of writing, this report was expected to be finalised ahead of a
scheduled meeting with Historic Environment Scotland (HES) on 26 November. 
Following that meeting, the intention is to submit the LBC application early in the new
year. While the determination timescale will largely depend on HES, an update is
anticipated ahead of P&S Committee in Quarter 1, 2026. 
2.11.6 Ravenscraig Community Hub: Report to Policy and Strategy Committee 
It is important that the assessment considers the options for both the existing school
estate, as well as the desire for new learning and cultural offerings. It is important that
HES are provided with the information to consider the LBC outlined above, ahead of
any decision the council may make. It is therefore expected that committee will be
provided with an update at P&S Committee in Quarter 1, 2026.   
Existing School Estate – Condition Core Fact 
2.12 “Condition” is one of the three core facts published at a national level annually. Each
local authority uses a national “workbook” to assess each individual element of the
school building, as set out in the Core Fact guidance, to establish the score for each
‘block’ and thereafter each ‘school’. 
2.13 The condition assessment allows for an elemental breakdown of each block, identifying
where improvements could be made through investment. At a national level, each
school is provided with a ‘condition rating’ based on the score from the workbook
assessment.  Each school should be assessed every five years, with a ‘rolling
programme’ of our school estate across the five years.  Each year, all condition ratings
are published at a national level. 
2.14 Each school is given a rating, based on the assessment score, and each rating has a
letter, and a descriptor to indicate the condition of each school.  A rating of “A” is classed
as “good”; a rating of “B” is classed as "satisfactory”; a rating of “C” is classed as "poor”;
and a rating of “D” is classed as "bad”. 
2.15 Scotland’s Learning Estate Strategy (LES), and the associated Learning Estate
Investment Programme (LEIP), use the condition core fact as a key indicator for
investment decisions within the school estate at a national level, and looks to target
investment into schools in C (Poor) or D (Bad) condition. Indeed, within the LES, it
Page 155 of 216

Page 156

states that “The Scottish Government’s overarching school estate policy is that “no child
should have to learn in a school that is in poor or bad condition”. 
Existing school estate: Condition related capital investment 
2.16 Within the Strategic Capital Investment Report, presented to Policy and Strategy
Committee in March 2025, £30m was allocated to improve the condition of the existing
school estate.  This funding is being targeted towards schools which have an overall
rating of C (Poor). In broad terms, officers have worked to identify up to ten schools
which, through targeted investment, have their rating improved from the current C
(Poor) rating through targeting specific elements such as roof, walls and windows, etc.
Below is the list of schools being assessed for potential targeted investment.   
Berryhill Primary School Kilsyth Primary School
Chapelside Primary School St Barbara’s Primary School
Christ the King Primary School St Mary’s Primary School, Coatbridge
Condorrat Primary School St Mary’s Primary School, Cleland
Corpus Christi Primary School St Thomas’ Primary School
Table 2.16 – School identified for condition investment assessment 
2.17 It is recognised that targeted investment will not yield the same level of results as that
of a new build in any of these existing establishments, but demonstrates that targeted
investment within the existing estate, provides enhancements to the fabric of these
buildings. It is further recognised that the £30m is a finite sum, and there is a likelihood
that not all 10 schools will receive investment to improve their condition rating. It is
important to recognise that “up to” 10 schools will be invested in, and that because a
school is identified for assessment does not mean it will receive investment. 
2.18 It is evident that the existing funding will not upgrade all of the existing C (Poor) rated
schools within our school asset portfolio.  What it will do, is evidence the difference
such investment can make, in the hope that it will lead to more capital funding to
manage the estate proactively, through targeted, evidence led investment, which
ensures our estate is to a standard the council looks to provide for all our young people.   
Existing School Estate – Sufficiency / Utilisation Core Fact 
2.19 The sufficiency/utilisation of the school estate looks to create an optimal balance
between the number of spaces available in any given school, and the number of spaces
needed. A ‘middle ground’ is optimal in this regard, as we do not want our schools to
be ‘too empty’ nor ‘too full’. 
2.20 Where a school is projected to become ‘too full’ measures can be put in place to react
to this change.  In most cases, where the projections show that this will be temporary,
temporary accommodation can be provided (such as modular classrooms) which
provide additional capacity.  Where the increase is expected to be long term, it is more
appropriate to consider an extension to the school.  Where the extension would not
adequately meet the needs of the school, or where there is not enough space on the
school grounds to create the required accommodation without significant negative
impact on the outdoor space – a new build is considered. 
2.21 Examples of capacity related project are outlined at section 2.8 above. These schools
were examples where new builds were required.  Within the general capital
Page 156 of 216

Page 157

programme, there is a “sustainable estate” theme which provides increased capacity
through the other means – with examples in recent years being: 
• Modular classrooms at Auchinloch PS, Taylor HS, Glencairn PS, Brannock HS
• Internal adaptations to create four classrooms at St Barbara’s PS
• Two class extension at All Saints PS 
2.22 In terms of sufficiency/utilisation, the council has provided adequate levels of funding
to closely match demand – where the requirement has been to increase capacity. 
2.23 The SARIS Report, presented to Policy and Strategy in December 2023, outlined that
the demographic shift in our population over the coming decades will require less
spaces in schools – with the expectation that the “too empty” issue will become
prevalent. 
2.24 As outlined with section 1.7 above, and within the SARIS report, it was argued that
whilst the strategy of ‘centring community assets around the school estate’ remained
valid, the financial outlook made it more difficult to deliver this through “new assets”
alone and made the argument for adapting the existing estate to deliver the ‘community
hub’ elements for local communities. 
2.25 The short to medium term strategy, as outlined within that report, made a case for future 
funding to be provided to convert existing spaces, within schools with excess capacity,
to meet the different needs of the wider community.  In the main, this will be informed
through the Leadership and Operating Model, which also reports through the Policy
and Strategy Committee, with updates provided to committee in December 2024, June
2025, and December 2025. 
2.26 The latest capital funding release, in March 2025, provided £30m funding to look to
improve the condition of the estate.  This has provided an opportunity to assess ‘tests
of change’ through project delivery.  Future funding has not yet been made available
for the same ‘test of change’ opportunity within the Sufficiency/Utilisation theme, testing
the removal of spaces with “too empty” schools, and repurposing spaces for other uses. 
2.27 Whilst having “too much space” is clearly not as pressing as having “too little space” in
a school, it will slowly create a less efficient school estate year on year and potentially
hinder further reduction in the overall council asset portfolio (by closing smaller older
buildings and moving these services into ‘hubs’) – thus continuing the pressure on
maintaining existing older assets with the limited revenue maintenance budget. 
2.28 Therefore, whilst a less acute issue at present, officers will continue to make the case
for investment in this area, to ‘test the change’ of adapting schools within our
communities, which have excess capacity, to better meet the needs of the local
community through a reduced, but more efficient and balanced asset portfolio. 
Existing School Estate – Suitability Core Fact 
2.29 Whilst the condition core fact looks at the fabric of the building, the suitability core fact
looks at the functional aspects of the building and how conducive it is to modern
learning and teaching. As outlined in sections above, a new build can provide bespoke
spaces which clearly meet current needs of the learners – bright spaces, separate
dining/sports provision, wide spacious activity areas, and interesting outdoor spaces. 
2.30 Suitability is perhaps the hardest of the core facts to improve within the existing estate.
This is not surprising – it is clear when a school does not have enough space for the
Page 157 of 216

Page 158

pupils (sufficiency/utilisation), or when a roof is leaking and in need of replacement. 
With limited funding, it is also hard to justify building an extension onto a school, simply
to create a dining room which is separate from the sports hall. 
2.31 That said, there has been targeted investment within this area over the last few capital
programmes.  One specific area of targeted investment has been through the
conversion of red ash/blaes pitches within the school estate, as outlined below. 
2.32 Red blaes pitches, a staple part of the PE diet in the 1970s and 80s have long since
become less than ideal for use as outdoor PE spaces. The school estate in this regard
has three tiers of outdoor sports provision: top-tier (synthetic pitch provision), mid-tier
(grass / forest school provision), bottom-tier (red blaes pitches). Those with red blaes
pitches have had less available outdoor spaces to use as a result. 
2.33 Like the cost of new build schools, the cost of synthetic pitch provision has increased
dramatically over the last few years – with a full-size synthetic pitch costing in the region
of £1m to deliver.  Additionally, there is a significant level of maintenance (and
associated cost) to keep these facilities at an adequate level, and the surface should
be replaced every 10 years or so. It is accepted that these facilities are well used by
the local community and are in demand, but are centred on one sport, and do not
always generate income to match expenditure. 
2.34 Therefore, the council has adopted an alternative strategy in relation to the upgrade of
the red blaes pitches in school grounds.  The council has chosen to create Multi Use
Games Areas (MUGAs) in these spaces.  This is for two reasons: 
• MUGAs offer access to a larger number of sports within a much smaller footprint
• These areas are much more hard wearing, more cost efficient to deliver (around
£200k per project at a primary school site), and require less maintenance. 
Existing School Estate: Suitability Core Fact
‘Free to use’ multi-sports provision for the school and wider community 
2.35 The first MUGA created within this programme was at St Maurice’s High School in
Cumbernauld.  This project created a 200m running track, a full “NBA” sized basketball
court and a multi ball sports area, along with a 9-a-side grass football pitch.  This facility
was commended by both Scottish and British Athletics, with a visit from both
organisations, who believed it to be the first of its kind in the UK.  This facility is open
to the public outwith the school day, free of charge. 
2.36 Other MUGAs that have subsequently been brought forward have adopted a similar
approach.  The project team work with the school, active schools co-ordinators, and
the local stakeholders to understand the preferred sports in the area and the MUGA is
designed to accommodate these sports. All of the MUGAs provided to date provide
community access outwith the school day using a double gate system: School gate is
unlocked and opened during the school day – with the community gate locked and
inaccessible.  Outwith the school day the reverse is true – school gate locked and
inaccessible with the community gate opened for use by the wider community. 
2.37 The red blaes pitches are predominantly within the north area of North Lanarkshire,
presumably due to when the schools were constructed, and the suitability of these
surfaces at that time.  There were 19 schools identified as having red blaes pitches
which have been prioritised based on: availability of community access, and levels of
deprivation. 
Page 158 of 216

Page 159

2.38 To date, nine schools have had or are in the process of having these spaces upgraded:
St Maurice’s HS, Woodlands PS, Kilsyth PS, Ravenswood PS, St Aidan’s PS, St Mary’s
(Cumbernauld) PS, St Barbara’s PS, and St Helen’s PS have all been completed.
Westfield PS is under construction, and discussions have started with Eastfield PS
around bringing forward a project at this establishment. 
2.39 Whilst this is good progress, there has not been sufficient funding provided to date,
which would enable upgrades at all 19 schools. Further funding, to bring all schools up
to a minimum of “mid-tier” would be a significant milestone for the council. 
2.40 It is accepted that there are limitations to how the suitability of schools can be upgraded
and enhanced. However, as demonstrated through the MUGA programme to date, the
enhancement and subsequent improved suitability of outdoor sports facilities - for both
the school and the wider community, can be achieved through targeted investment
when funding is made available. 
Next steps 
2.41 It is clear there has been much progress to date, linked into the SARIS strategy, mainly
around the school estate and replacing schools with schools, and latterly through
replacing schools with community hubs. The focus has had to change, with a need to
consolidate assets into a better, more efficient community offering. The data clearly
shows that the ages and stages of our population has and will continue to shift, and our
strategy must be flexible enough to accommodate any such shift. 
2.42  In addition to new build projects, the council must continue to look to adapt the existing
school estate where existing excess capacity is available, prioritising areas of
deprivation first, to deliver an enhanced community offering. These “tests of change”
will help define and refine what solutions are required in the medium to long term: 
• Where it is appropriate to create new bespoke hubs (i.e. prioritise capacity
related demand projects). 
• Where it is appropriate to transform existing spaces to provide a better balance
of facilities and services within buildings which are subsequently in better
condition. 
• Where it is appropriate to rationalise and ‘fold in’ the offerings, providing leisure,
cultural, and outreach ‘hub’ offerings around the existing school estate. 
2.43  As outlined throughout this report, the strategy remains strong – building the solutions
around the school estate. However, the pace at which the Council can reduce,
rationalise and transform the assets for our communities will be directly in proportion to
the level of capital funding available. 
2.44 As outlined in the SARIS Update report in September 2024, reliance on external capital
funding is now a significant risk and the more the Council can generate its own capital
growth to insulate itself against the uncertainty of external funding will significantly
reduce this risk and would allow the council to better plan and accelerate the transition
of our wider estate. 
3. Measures of success 
3.1  Continued investment and improvements in the school estate.   
Page 159 of 216

Page 160

4. Supporting documentation 
No supporting documents. 
James McKinstry
Chief Officer - Assets and Procurement 
Page 160 of 216

Page 161

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
All projects are delivered within the overall scope of the councils capital
programme, whilst we also forward plan for potential future projects and associated
funding. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Page 161 of 216

Page 162

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Improvement in the core fact data for our assets can contribute to improving carbon
emissions. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Page 162 of 216

Page 163

Yes ☐ No ☐ 
Page 163 of 216

Page 164

Page 164 of 216

Page 165

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/KS/FC Date 04/12/25 
Council Tax Strategy Update 
From  Greg Telfer, Chief Officer (Finance & Technology)  
E-mail TelferG@northlan.gov.uk Telephone 07583010692 
Executive Summary
In setting the 2025/26 budget, members acknowledged the Council Tax Strategy report
taken to Policy and Strategy Committee on 5 December 2024.  As a result, the Council
took the decision to approve a 10% increase to Council Tax, resulting in an increased Band
D charge of £1,452.86.  The council also agreed to set aside 2% of the Council Tax
increase for additional capital investment through the Community Investment Fund.  The
Medium Term Financial Plan (MTFP) approved in June 2025 assumes that in line with the
Council Tax Strategy report, the 2% will be committed for 3 years from 2025/26 to 2027/28
and return to 1% thereafter. 
As outlined in the Council Tax Strategy reported in December 2024 an annual update would
be required following consideration of the approved Council Tax increases across Scotland
for 2025/26, the impact on the band D average, and whether this has an impact on North
Lanarkshire Council’s strategy. 
Members are reminded that Council Tax Band D represents the average Council Tax bill
for householders in Scotland. This Council’s Band D rate for 2025/26 is £1,452.86,
compared to the Scottish average of £1,543, and places North Lanarkshire Council 4th
lowest, down from 5th in 2024/25, in terms of the Band D rate across all 32 Scottish Local
Authorities. This is despite North Lanarkshire ranking 6th out of 32 authorities in terms of
deprivation based on the most up to date published statistics, which creates significant
demand across services that support and address the challenges around poverty and
deprivation. 
Recognising that Council Tax charges represent the only significant means of generating
income within Council control, and against a backdrop of an extremely challenging financial
outlook, it remains essential for the Council to review the Band D position as part of a suite
of solutions to ensure balanced budgets can be set annually, while continuing to protect
and invest in vital community, family and person-centred services. 
In determining the Council Tax Strategy, it is considered important to keep in mind that
those people in receipt of Council Tax Reduction benefit, and therefore those with the
lowest incomes, will not be affected by any increase in council tax.   
This report outlines 3 potential scenarios for members consideration.  Scenario A aims to
bring North Lanarkshire Council Band D charges in line with the Scottish average, over
one year, falling to the estimated Scottish average increases. Scenario B is based on a
Item 8
Page 165 of 216

Page 166

10% per annum for 2026/27 and 2027/28, as previously recommended, falling to the
estimated Scottish average thereafter.  Scenario C outlines the position if Council Tax
increases were set at a level to close the estimated three year budget gap as indicated in
the Medium Term Financial Plan approved in June 2025, also falling to the estimated
Scottish average thereafter. 
A number of assumptions have been made to model these scenarios, which are subject to
change.  Table 1 below summarises the Council Tax increases that would be applicable
for each of the scenarios; 
Using the latest Medium Term Financial Plan position as the baseline, Table 2 below
summarises the net additional income generation for each of the scenarios after assuming
the first 2% per annum continues to be ringfenced for the Community Investment Fund for
2026/27 and 2027/28 (returning to 1% thereafter), and absorbing consequential additional
cost impact on Council Tax Reduction (CTR) benefit.   
Members will appreciate the financial benefit of implementing a strategy based on any of
the scenarios above would be significant.  For example, the 2026/27 budget gap could be
reduced by between £14.973m and £34.638m, the three year gap by between £38.204m
and £85.949m, and the five year gap by between of £57.462m to £108.430m. 
To support members with planning and decision making the Section 95 Officer continues
to recommend, for illustrative purposes only, that future Financial Outlooks and CIF
modelling will reflect Scenario B, a 10% Council Tax increase.  The Council Tax level will
ultimately be a decision for members when setting the budget, with the financial impact
that differs from such illustrations also reflected. 
The impact of a 10% increase on all bandings for this council in 2026/27 are summarised
below, which shows an increase ranging between £1.86 to £6.83, per week. However,
Members should note that the council has around 162,000 total chargeable properties and
c. 80% are band A to D, and 20% band E to H, with almost 73,000 entitled to a discount or
exemption, for example the single person discount or disabled person relief.  In addition,
more than 34,000 chargeable properties on average are in receipt of CTR (approx. 65%
are of working age and 35% of pension age).
Scenario 2026/27 2027/28 2028/29 2029/30 2030/31
A 12.81% 6.00% 5.00% 5.00% 5.00%
B 10.00% 10.00% 5.00% 5.00% 5.00%
C 23.22% 14.54% 12.52% 5.00% 5.00%
Table 1
Council Tax Increases
Scenario 2026/27 2027/28 2028/29 2029/30 2030/31
Total 3 year
total
£m £m £m £m £m £m £m
A 19.152 10.094 8.958 9.422 9.836 57.462 38.204
B 14.973 16.463 9.026 9.493 9.910 59.865 40.462
C 34.638 25.956 25.355 11.001 11.479 108.430 85.949
Table 2
Net Additional Financial Impact
Page 166 of 216

Page 167

1. Background 
1.1. Members are aware that councils have a legal duty to set a balanced budget. This means
that a council’s funding and income must equal the anticipated expenditure.  Financial
projections as outlined in the council’s Medium Term Financial Plan have identified
anticipated budget shortfalls which will require the approval of solutions to bridge these
budget gaps. Potential solutions will include approval of savings to be implemented in
the course of the next three financial years or income generation opportunities, including
council tax increases. 
1.2. In setting the 2025/26 budget, members acknowledged the Council Tax Strategy report
taken to Policy and Strategy Committee on 5 December 2024.  As a result, the Council
took the decision to approve a 10% increase to Council Tax, resulting in an increased
Band D charge of £1,452.86.  The council also agreed to set aside 2% of the Council
Tax increase for additional capital investment through the Community Investment Fund. 
The Medium Term Financial Plan (MTFP) approved in June 2025 assumes that in line
with the Council Tax Strategy report, the 2% will be committed for 3 years from 2025/26
to 2027/28 and return to 1% thereafter. 
1.3. An update on the Council’s forecast Medium Term Financial Plan (MTFP) was approved
in June 2025, outlining an envisaged forecast budget gap over a five-year period to 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Considers the scenarios set out in this report.
(2) Acknowledges their potential impact on setting the council’s budget in February
2026.
(3) Recognise the Section 95 Officer recommends, for illustrative purposes only, that
future Financial Outlooks and CIF modelling will reflect Scenario B, a 10% Council
Tax increase.  The Council Tax level will ultimately be a decision for members when
setting the budget, with the financial impact that differs from such illustrations also
reflected. 
(4) Acknowledge the next steps as outlined in paragraphs 2.18 to 2.20. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
A B C D E F G H
No. Of
Dwellings
52,503 38,170 20,713 18,622 17,697 10,738 3,199   172    
Increase per
week
1.86 2.17 2.48 2.79 3.66 4.53 5.46 6.83
2026/27 Rate 1065.43 1243.00 1420.57 1598.15 2099.79 2596.99 3129.70 3915.46
Council Tax Band
Page 167 of 216

Page 168

2030/31 of £136.927m. The budget gap over the next three financial years is forecast at
£85.949m, when compared with the three year gap reported in June 2024 of £61.976m. 
Thus, demonstrating a worsening three year financial outlook. 
1.4. As outlined in the Council Tax Strategy reported in December 2024 an annual update
would be required following consideration of the approved Council Tax increases across
Scotland for 2025/26, the impact on the band D average, and whether this has an impact
on North Lanarkshire Council’s strategy.. 
1.5. This report also continues to provide a recommendation focused on improving the
Council’s forecasted budget position as outlined above. 
Council Funding 
1.6. Chart 1 below is a reminder to members that the council’s 2025/26 revenue resources
largely consists of government grant, Aggregate External Finance (government grants
plus non-domestic rates), equating to approximately 82% of total funding.  Council Tax
income is the only other main source of income available to councils and currently
provides approximately 17%, or £187.8m, of funding.   
1.7. While it continues to be acknowledged that this Council has endeavoured to keep bills
for residents as low as possible, for as long as possible, Council Tax as an income
generating lever for councils has been acknowledged more recently, as part of a suite of
solutions to ensure balanced budgets can be set annually, whilst continuing to protect
and invest in vital community, family and person-centred services.  Despite this there
remains an ongoing risk that the Scottish Government may enforce a cap or freeze in
the future. 
Chart 1 
1.8. Over recent years, most increases in government funding have been ringfenced or
directed towards delivery of Scottish Government priorities and initiatives. Over this
period, both the cost of delivering services and demand for them have increased
significantly, resulting in the requirement to consider difficult decisions to deliver savings
in order for the Council to set a balanced and sustainable budget.
Page 168 of 216

Page 169

1.9. The Scottish Government published its Medium-Term Financial Strategy in June 2026.
Whilst it indicated the potential for growth in funding for local government over the
planning period, it is acknowledged that much of that funding growth is likely to be
required to support existing policy commitments and national priorities and may not be
available to support core funding and demand pressures faced by local government. 
1.10. Additionally, members are reminded that North Lanarkshire Council currently funds
around 17% of services from Council Tax. When compared to the likes of Glasgow City
Council at 18% from Council Tax, this demonstrates there is scope to reduce the
council’s reliance, however marginally, on Scottish Government funding settlements by
having a greater proportion of services funded through Council Tax. 
2. Report 
Council Tax Banding Analysis; 2025/26 update 
2.1. Council Tax Band D represents the average council tax bill for householders in Scotland.
The annual Council Band D charge for 2025/26 in North Lanarkshire Council is
£1,452.86, which equates to £27.86 per week, or £121.07 per calendar month.  Appendix
1 summarises the current Council Tax bandings in Scotland. 
2.2. Table 3 shows the 2025/26 Band D charges for each Scottish council ranked in order
from highest to lowest. This shows North Lanarkshire Council has gone from 5th lowest
to 4th lowest, charging £90.44 per annum less than the Scottish average, with a 6.22%
increase required to reach the current average, assuming there are no other increases
across Scotland. When compared with the highest Band D charge of £1,636.27, North
Lanarkshire’s charge is £183.41 less per annum, with a 12.62% increase required to
charge an equivalent sum. Should the Council’s band D be equal to the current Scottish
average this would generate net additional annual income in perpetuity of £9.560m and
around £21.800m at a level equivalent to the highest Band D charge.  
Page 169 of 216

Page 170

Table 3 
2.3. Despite ranking 4th lowest for Band D Council Tax, North Lanarkshire has the sixth-
highest levels of deprivation in Scotland (SIMD 2020). Table 2 shows the six most
deprived council area, their ranking for Band D Council Tax and current Band payment
per week, with North Lanarkshire being the lowest.  
Rank Authority 2025/26
Band D
2025/26
Band D
per week
2025/26
Band D
per mth
(over 12)
2025/26
Band D
per mth
(over 10)
1 Aberdeen City £1,636.27 31.38 136.36 163.627
2 Midlothian £1,666.20 31.95 138.85 166.62
3 Argyll & Bute £1,625.64 31.18 135.47 162.564
4 Stirling £1,611.78 30.91 134.32 161.178
5 Glasgow City £1,611.00 30.90 134.25 161.1
6 East Ayrshire £1,606.44 30.81 133.87 160.644
7 Dundee City £1,605.34 30.79 133.78 160.534
8 East Dunbartonshire £1,599.70 30.68 133.31 159.97
9 Clackmannanshire £1,594.38 30.58 132.87 159.438
10 East Lothian £1,579.18 30.29 131.60 157.918
11 Falkirk £1,576.77 30.24 131.40 157.677
12 Orkney Islands £1,574.60 30.20 131.22 157.46
13 Moray £1,573.76 30.18 131.15 157.376
14 Renfrewshire £1,572.61 30.16 131.05 157.261
15 South Ayrshire £1,569.41 30.10 130.78 156.941
16 City of Edinburgh £1,563.51 29.99 130.29 156.351
17 West Dunbartonshire £1,559.86 29.92 129.99 155.986
18 North Ayrshire £1,553.77 29.80 129.48 155.377
19 Inverclyde £1,551.30 29.75 129.28 155.13
20 Perth & Kinross £1,537.04 29.48 128.09 153.704
21 Aberdeenshire £1,532.76 29.40 127.73 153.276
22 East Renfrewshire £1,528.44 29.31 127.37 152.844
23 Highland £1,527.09 29.29 127.26 152.709
24 West Lothian £1,515.45 29.06 126.29 151.545
25 Fife £1,498.76 28.74 124.90 149.876
26 Scottish Borders £1,491.72 28.61 124.31 149.172
27 Angus £1,461.52 28.03 121.79 146.152
28 Dumfries & Galloway £1,454.98 27.90 121.25 145.498
29 North Lanarkshire £1,452.86 27.86 121.07 145.286
30 Na h-Eileanan Siar £1,387.56 26.61 115.63 138.756
31 Shetland  Islands £1,386.67 26.59 115.56 138.667
32 South Lanarkshire £1,378.85 26.44 114.90 137.885
Council Band D Ranking 2025-26
Page 170 of 216

Page 171

Table 4
Council
SIMD ranking Council Tax
Band D ranking
Band D £/week
Glasgow City 1 5 £30.90
West
Dunbartonshire
2 17 £29.92
Inverclyde 3 19 £29.75
North Ayrshire 4 18 £29.80
Dundee City 5 7 £30.79
North
Lanarkshire
6 29 £27.86 
Council Tax Income Budget, Council Tax Reduction Benefit & Chargeable Properties 
2.4. For context, the 2025/26 budget for council tax income is £187.769m.  This is generated
from a combination of direct payments from chargeable households and from Council
Tax Reduction (CTR) benefit.  Residents may be eligible for CTR if they are on a low
income or claim benefits, with the potential for their council tax being reduced by up to
100%. 
2.5. Members are reminded that the CTR benefit assessment takes individual circumstances
into account to determine how much council tax a household is eligible to pay, regardless
of the charge applicable.  Therefore, if council tax charge rises, CTR claimants continue
to pay the same amount, and in most cases, this is £nil.  This position has been widely
reported when the Scottish Government previously imposed a council tax freeze,
indicating that such a decision does little to protect the lowest income households, rather
it proportionately benefits relatively wealthier households. 
2.6. North Lanarkshire Council had just under 162,000 total chargeable properties (c. 80%
band A to D and 20% band E to H) for council tax as at 31 March 2025, with over 22,000
entitled to a discount or exemption, for example the single person discount or disabled
person relief.  In addition, more than 34,000 chargeable properties on average are in
receipt of CTR (approx. 65% are of working age and 35% of pension age).  The total
estimated cost of CTR for 2025/26 is £29.571m, with over 90% applicable to bands A to
D properties.  More than 96% of all CTR awards relate to chargeable properties in Bands
A to D, and around 84% of all awards receive 100% benefit, offsetting their council tax
bill in full.  The remaining 16% of recipients receive CTR benefit of more than 52% of
their chargeable bill, on average.  A summary of CTR accounts and awards across all
bandings as at 1 April 2025, is shown in Appendix 2.  These figures will vary throughout
the year. 
2.7. After adjusting for discounts, exemptions and CTR, around 61% of council tax income
(£value) is generated from band A to D chargeable properties, with approximately 39%
generated from bands E to H. 
Page 171 of 216

Page 172

Council Tax Strategy 
2.8. Three potential scenarios are outlined below for consideration, see below. 
2.9. The main assumptions in modelling all scenarios are: 
• all other authorities apply an increase of 6% in 2026/27, 6% in 2027/28 and 5%
per annum for the next three years (which is based on indicative financial
planning assumptions across Scotland)
• this Council continues to commit to an increase of 2% in support of the
Community Investment Fund (CIF) for 2026/27 and 2027/28, dropping back to
1% thereafter
• no account has been taken of any increases in household growth, although a
measure of this is included in the MTFP and within Community Investment Fund
assumptions
• the estimated net additional income generated is modelled after accounting for
the 2% increase ring fenced for CIF and the incremental consequential impact on
CTR costs, already built into the Medium Term Financial Plan
• the mix and £value of chargeable households in receipt of a council tax discount/
relief or CTR, remain broadly the same
• council tax collection rates remain at existing levels.  Although it is recognised
that subject to the scale of council tax increases, there is a potential for a
decrease in the collection rate and ultimately an increase in the requirement for
a bad debt provision, no estimate has been made for this at this stage. 
• review is over a timeframe of five years. 
Scenario A – Scottish average in one year 
2.10. Aligning the Band D charge to the Scottish average in one year will require an increase
in charge of 12.81% in 2026/27, 6% in 2027/28 and 5% per annum for the following three
years. 
• The council would move to 20th place out of 32 for Band D council tax (the Scottish
average) in 2026/27 (£1638.98), maintaining that position thereafter.
• Band D charges would rise by £3.29 per week in 2026/27 or £14.30 per calendar
month, in addition to the 2% already assumed.
• The 2026/27 total Band D charges would be £1.638.97, a weekly increase of
£3.57 or £15.51 per calendar month.
• This scenario would materially reduce the budget gap in 2026/27 by an estimated
£19.152m, the three-year gap by £38.204m and the gap over five years by
£57.462m.
• The cumulative additional income generation by financial year 2030/31 is
estimated at £191.689m, in perpetuity. This scenario is the equivalent of 429.8
FTE average NLC single status jobs in 2026/27 and 1,289.7 FTE over five years. 
Scenario B – 10% for two years, estimated Scottish average of 5% thereafter 
2.11. This scenario assumes an increase in Band D council tax of 10% for the next two
financial years, and a 5% increase per annum thereafter. 
• The council would move to 25th place out of 32 in year one, slightly above average
at 16th place from 2026/27 onwards. 
Page 172 of 216

Page 173

• Band D charges would rise by an additional £2.51 per week in 2026/27 or £10.90
per calendar month, in addition to the 2% already assumed 
• The 2026/27 total Band D charges would be £1,598.15, a weekly increase of
£2.79 or £12.11 per calendar month.
• This scenario would materially reduce the budget gap in 2026/27 by an estimated
£14.973m, the three-year gap by £40.462m and the gap over five years by
£59.865m.
• The cumulative additional income generation by year 2030/31 is estimated at
£196.692m in perpetuity. This scenario is the equivalent of 336.1 FTE average
NLC single status jobs in 2026/27 and 1343.6 FTE over five years. 
Scenario C – fully close three year budget gap per MTFP June 2025 
2.12. This scenario shows the impact of a strategy to fully close the forecast budget gap as 
reported in the MTFP for the next three years (23.22%,14.54%, 12.52%), and a 5% 
increase per annum thereafter. 
• The council would move to 1st place out of 32 for Band D council tax in year one,
and maintaining that position thereafter.
• Band D charges would rise by an additional £6.19 per week in 2026/27 or £26.91
per calendar month, in addition to the 1% already assumed.
• The 2026/27 total Band D charges would be £1.790.27, a weekly increase of
£6.47 or £28.12 per calendar month.
• This scenario would materially reduce the budget gap in 2026/27 by £34.638m,
the three year gap by an estimated £85.949m and the gap over five years by
£108.430m.
• The cumulative additional income generation by year 2030/31 is estimated at
£386.561m in perpetuity. This scenario is the equivalent of 777.4 FTE average
NLC single status jobs in 2026/27 and 2433.6 FTE over five years. 
2.12. Appendix 3 shows the additional impact of the scenarios above, after accounting for
2% for CIF and in total, on Band D weekly, monthly and annual charges. Appendix 4
summarises the cumulative additional income and FTE impact across all scenarios. 
2.13. Table 5 below summarises the estimated net additional financial impact for each of the
scenarios:   
2.14. Members are reminded that the financial modelling is based on a number of variables,
the outcome of which is hugely uncertain, not least of all the assumption around
increases approved by all other authorities. Therefore, the modelling will require to be
reviewed annually to reflect actual outcomes, to ensure the position for the council is
flexed accordingly, in order to achieve the aim of aligning with the average. An annual
update report will be provided to elected members in this regard. 
Scenario 2026/27 2027/28 2028/29 2029/30 2030/31
Total 3 year
total
£m £m £m £m £m £m £m
A 19.152 10.094 8.958 9.422 9.836 57.462 38.204
B 14.973 16.463 9.026 9.493 9.910 59.865 40.462
C 34.638 25.956 25.355 11.001 11.479 108.430 85.949
Table 5
Net Additional Financial Impact
Page 173 of 216

Page 174

2.15. An illustration of the impact of each of the scenarios on the envisaged gap reported in
the Medium Term Financial Plan is provided in the table below.  For example, this
shows that the budget gap in 2026/27 of £34.638m could potential be reduced to
£15.486m, £19.665m, or £nil m, for Scenarios A, B, & C, respectively.  The three year
gap could be reduced to £47.745m, £45.487m, or £nil m, for Scenarios A, B, & C,
respectively. 
Other Considerations 
2.16. The Community Investment Fund (CIF) update to this Committee highlights an
investment factor of £1.000m of revenue resources supports £17.159m of capital
expenditure. Assuming the same investment factor, the financial cost of ring fencing an
additional 1% or 2% in 2026/27 for example, is estimated to cost around £1.901m and
£3.802m funding capital investment between £33m and £67m depending on the
additional ringfenced percentage and which of the scenarios is ultimately adopted. It
should be noted that ring fencing more of any council tax increase for capital investment
would impact the position shown in Table 6 above, and the percentage increase
applicable. Such a scenario would require a greater increase in council tax charges. 
2.17. It is recognised that depending on the scale of the increases there is a potential for a
decrease in the collection rate for council tax and ultimately increase the requirement for
a bad debt provision, neither of which have been estimated in the modelling. This would
be monitored, and any impact reflected in future financial planning updates.  For context,
a 1% increase or decrease on the income collected in 2025/26 equates to £1.777m. 
Next Steps 
2.18. To support members with planning and decision making the Section 95 Officer
recommends, that future Financial Outlooks and CIF modelling will reflect Scenario B,
i.e. a 10% Council Tax increase for the next two years.  However, it is acknowledged
that the Council Tax level will ultimately be a decision for members when setting the
budget, with the financial impact that differs from such illustrations also reflected. 
2.19. This report should be considered alongside the Community Investment Fund – Annual
Update report also included on this agenda. 
2.20. An updated Financial Outlook will be provided at upcoming budget planning sessions
with elected member groups, which will incorporate any financial consequences arising
from this report. 
2026/27 2027/28 2028/29 2029/30 2030/31 Total 3 year
total
£m £m £m £m £m £m £m
34.638 25.956 25.355 26.063 24.915 136.927
85.949
Scenario A 15.486 15.862 16.397 16.641 15.079 79.465 47.745
Scenario B 19.665 9.493 16.329 16.570 15.005 77.062 45.487
Scenario C 0.000 0.000 0.000 15.062 13.436 28.497 0
Table 6
MTFP ENVISAGED GAP @ June
2025
Adjusted MTFP
Gap;
Page 174 of 216

Page 175

Risks and Uncertainty 
2.21. All activities undertaken by the council are subject to a degree of risk and uncertainty,
which are recorded in the Service/ Corporate risk registers. The current economic climate
such as insufficient government grant funding, the rising forecast of pay and non-pay
inflation, and other external factors, all have the potential to impact upon the council’s
ability to provide quality services within approved budget levels, and remaining financially
sustainable.   As such the council continuously reviews and updates its Medium Term
Financial Plan incorporating future planning scenarios. However, as outlined in the
report, it is incumbent upon the council to consider all financially sustainable solutions to
set a balanced budget to maintain sustainable services. 
3. Measures of success 
3.1 The council continues to review the assumptions within the Medium Term Financial Plan.
A policy on Council Tax uplifts will give more certainty in forecasting future income
generation and therefore the impact on future budget gaps.   
4. Supporting documentation 
4.1 Appendix 1 2025/26 Council Tax for all bandings across Scotland
4.2 Appendix 2 Council Tax Reduction Statistics at 1 April 2025
4.3 Appendix 3  Band D rates across five financial years, by scenario
4.4 Appendix 4 Cumulative Income Generation & FTE Equivalents 
Greg Telfer
Chief Officer (Finance & Technology) 
Page 175 of 216

Page 176

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
Financial impacts have been outlined within the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 176 of 216

Page 177

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐  
Page 177 of 216

Page 178

Appendix 1 
COUNCIL TAX BY BAND 2025-26
Scotland Average Band D Council Tax (based on total Band D Equivalents) £1,543
Band A Band B Band C Band D Band E Band F Band G Band H
Valuation Band Range
(as at 1991)
Under
£27,000
£27,001
to £35,000
£35,001
to £45,000
£45,001
to £58,000
£58,001
to £80,000
£80,001
to £106,000
£106,001
to £212,000
£212,000
and over
Ratio to Band D 240/360 280/360 320/360 360/360 473/360 585/360 705/360 882/360
Aberdeen City £1,090.85 £1,272.65 £1,454.46 £1,636.27 £2,149.88 £2,658.94 £3,204.36 £4,008.86
Aberdeenshire £1,021.84 £1,192.15 £1,362.45 £1,532.76 £2,013.88 £2,490.74 £3,001.66 £3,755.26
Angus £974.35 £1,136.74 £1,299.13 £1,461.52 £1,920.27 £2,374.97 £2,862.14 £3,580.72
Argyll & Bute £1,083.76 £1,264.39 £1,445.01 £1,625.64 £2,135.91 £2,641.67 £3,183.55 £3,982.82
City of Edinburgh £1,042.34 £1,216.06 £1,389.79 £1,563.51 £2,054.28 £2,540.70 £3,061.87 £3,830.60
Clackmannanshire £1,062.92 £1,240.07 £1,417.23 £1,594.38 £2,094.84 £2,590.87 £3,122.33 £3,906.23
Dumfries & Galloway £969.99 £1,131.65 £1,293.32 £1,454.98 £1,911.68 £2,364.34 £2,849.34 £3,564.70
Dundee City £1,070.23 £1,248.60 £1,426.97 £1,605.34 £2,109.24 £2,608.68 £3,143.79 £3,933.08
East Ayrshire £1,070.96 £1,249.45 £1,427.95 £1,606.44 £2,110.68 £2,610.47 £3,145.95 £3,935.78
East Dunbartonshire £1,066.47 £1,244.21 £1,421.96 £1,599.70 £2,101.83 £2,599.51 £3,132.75 £3,919.27
East Lothian £1,052.79 £1,228.25 £1,403.72 £1,579.18 £2,074.87 £2,566.17 £3,092.56 £3,868.99
East Renfrewshire £1,018.96 £1,188.79 £1,358.61 £1,528.44 £2,008.20 £2,483.72 £2,993.20 £3,744.68
Falkirk £1,051.18 £1,226.38 £1,401.57 £1,576.77 £2,071.70 £2,562.25 £3,087.84 £3,863.09
Fife £999.17 £1,165.70 £1,332.23 £1,498.76 £1,969.20 £2,435.49 £2,935.07 £3,671.96
Glasgow City £1,074.00 £1,253.00 £1,432.00 £1,611.00 £2,116.68 £2,617.88 £3,154.88 £3,946.95
Highland £1,018.06 £1,187.74 £1,357.41 £1,527.09 £2,006.43 £2,481.52 £2,990.55 £3,741.37
Inverclyde £1,034.20 £1,206.57 £1,378.93 £1,551.30 £2,038.24 £2,520.86 £3,037.96 £3,800.69
Midlothian £1,110.80 £1,295.93 £1,481.07 £1,666.20 £2,189.20 £2,707.58 £3,262.98 £4,082.19
Moray £1,049.17 £1,224.04 £1,398.90 £1,573.76 £2,067.75 £2,557.36 £3,081.95 £3,855.71
Na h-Eileanan Siar £925.04 £1,079.21 £1,233.39 £1,387.56 £1,823.10 £2,254.79 £2,717.31 £3,399.52
North Ayrshire £1,035.85 £1,208.49 £1,381.13 £1,553.77 £2,041.48 £2,524.88 £3,042.80 £3,806.74
North Lanarkshire £968.57 £1,130.00 £1,291.43 £1,452.86 £1,908.90 £2,360.90 £2,845.18 £3,559.51
Orkney Islands £1,049.73 £1,224.69 £1,399.64 £1,574.60 £2,068.85 £2,558.73 £3,083.59 £3,857.77
Perth & Kinross £1,024.69 £1,195.48 £1,366.26 £1,537.04 £2,019.50 £2,497.69 £3,010.04 £3,765.75
Renfrewshire £1,048.41 £1,223.14 £1,397.88 £1,572.61 £2,066.23 £2,555.49 £3,079.69 £3,852.89
Scottish Borders £994.48 £1,160.23 £1,325.97 £1,491.72 £1,959.95 £2,424.05 £2,921.29 £3,654.71
Shetland  Islands £924.45 £1,078.52 £1,232.60 £1,386.67 £1,821.93 £2,253.34 £2,715.56 £3,397.34
South Ayrshire £1,046.27 £1,220.65 £1,395.03 £1,569.41 £2,062.03 £2,550.29 £3,073.43 £3,845.05
South Lanarkshire £919.23 £1,072.44 £1,225.64 £1,378.85 £1,811.66 £2,240.63 £2,700.25 £3,378.18
Stirling £1,074.52 £1,253.61 £1,432.69 £1,611.78 £2,117.70 £2,619.14 £3,156.40 £3,948.86
West Dunbartonshire £1,039.91 £1,213.22 £1,386.54 £1,559.86 £2,049.48 £2,534.77 £3,054.73 £3,821.66
West Lothian £1,010.30 £1,178.68 £1,347.07 £1,515.45 £1,991.13 £2,462.61 £2,967.76 £3,712.85
Excludes Water and Sewerage
Source: As reported by the Local Authorities on the statistical return Council Tax Assumptions 2025
Page 178 of 216

Page 179

Appendix 2 
Page 179 of 216

Page 180

Appendix 3 
£ Rank £ Rank Add'l
Wkly
Increase
Add'l
Mthly
Increase
Add'l
Annual
Increase
£ Rank Add'l
Wkly
Increase
Add'l
Mthly
Increase
Add'l
Annual
Increase
£ Rank Add'l
Wkly
Increase
Add'l
Mthly
Increase
Add'l
Annual
Increase
£ Rank Add'l
Wkly
Increase
Add'l
Mthly
Increase
Add'l
Annual
Increase
£ Rank Add'l
Wkly
Increase
Add'l
Mthly
Increase
Add'l
Annual
Increase
Scotland Average 1,543.30  1,638.98  1,737.32  1,824.18  1,915.39  2,011.16 
6.22%
Scenario A £1,452.86 29 1,638.97  20 3.29     14.30   171.58  1,737.31  20 4.90     21.27   255.25  1,824.18  20 6.28     27.28   327.30  1,915.39  20 7.74     33.63   403.54  2,011.16  20 9.29     40.35   484.19    
Scenario B £1,452.86 29 1,598.15  25 2.51     10.90   130.76  1,757.97  16 5.29     22.99   275.91  1,845.87  16 6.69     29.08   348.99  1,938.16  16 8.18     35.53   426.31  2,035.07  16 9.74     42.34   508.10    
Scenario C £1,452.86 29 1,790.27  1 6.19     26.91   322.88  2,050.59  1 10.90   47.38   568.53  2,307.35  1 15.54   67.54   810.47  2,422.72  1 17.47   75.91   910.87  2,543.86  1 19.50   84.74   1,016.89 
£ Rank £ Rank Total
Wkly
Increase
Total
Mthly
Increase
Total
Annual
Increase
£ Rank Total
Wkly
Increase
Total
Mthly
Increase
Total
Annual
Increase
£ Rank Total
Wkly
Increase
Total
Mthly
Increase
Total
Annual
Increase
£ Rank Total
Wkly
Increase
Total
Mthly
Increase
Total
Annual
Increase
£ Rank Total
Wkly
Increase
Total
Mthly
Increase
Total
Annual
Increase
Scotland Average 1,543.30  1,638.98  1,737.32  1,824.18  1,915.39  2,011.16 
6.22%
Scenario A £1,452.86 29 1,638.97  20 3.57     15.51   186.11  1,737.31  20 1.89     8.19     98.34    1,824.18  20 1.67     7.24     86.87    1,915.39  20 1.75     7.60     91.21    2,011.16  20 1.84     7.98     95.77     
Scenario B £1,452.86 29 1,598.15  25 2.79     12.11   145.29  1,757.97  16 3.07     13.32   159.82  1,845.87  16 1.69     7.32     87.90    1,938.16  16 1.77     7.69     92.29    2,035.07  16 1.86     8.08     96.91     
Scenario C £1,452.86 29 1,790.27  1 6.47     28.12   337.41  2,050.59  1 4.99     21.69   260.32  2,307.35  1 4.92     21.40   256.76  2,422.72  1 2.21     9.61     115.37  2,543.86  1 2.32     10.10   121.14    
Potential Band D Rates per Scenario in Total
26/27 Rates 27/28 Rates 28/29 Rates 29/30 Rates 30/31 Rates25/26 Rates
30/31 Rates29/30 Rates 28/29 Rates27/28 Rates
North Lanarkshire Council
Potential Band D Rates per Scenario after  2% for CIF for 2 years and 1% thereafter
26/27 Rates25/26 Rates
Page 180 of 216

Page 181

Appendix 4 
Scenario 2026/27 2027/28 2028/29 2029/30 2030/31
£m £m £m £m £m
A 19.152 48.398 86.602 134.228 191.689
B 14.973 46.410 86.872 136.827 196.692
C 34.638 95.232 181.181 278.131 386.561
Scenario 2026/27 2027/28 2028/29 2029/30 2030/31 Total
A 429.8   226.6   201.0   211.5   220.8   1,289.7 
B 336.1   369.5   202.6   213.1   222.4   1,343.6 
C 777.4   582.6   569.1   246.9   257.6   2,433.6 
Cumulative income generation
FTE Equivalents
Page 181 of 216

Page 182

Page 182 of 216

Page 183

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    GT/VR/FC Date 04/12/25 
Review of Reserves Policy 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail telferG@northlan.gov.uk Telephone 07583 010692 
1. Background 
1.1 The Use of Reserves Policy, initially approved by Policy and Strategy in January 2020,
has been subject to annual review to ensure its continued relevance and effectiveness.
The policy aims to ensure that the Council’s reserves are managed prudently to
safeguard long-term financial sustainability and promote sound financial management.
Regular reviews of reserve levels are a key component of this approach. 
1.2 Furthermore the policy forms an important part of the Council’s Financial Strategy,
which provides the overarching framework for effective financial governance, planning,
and management. It supports the delivery of the Programme of Works and the Plan
for North Lanarkshire by ensuring a coordinated and robust approach to financial
planning. This is essential to successfully manage the scale and ambition of the
Council’s vision for North Lanarkshire as a place to live, learn, work, invest, and visit.
Executive Summary
The purpose of this report is to present a revised Reserves Policy that ensures the
Council’s reserves continue to be managed effectively to support long-term financial
sustainability, strategic service delivery, and effective budget planning. The updated policy
aims to provide a balance between supporting short term operational needs and longer
term priorities, allowing flexibility to support transformational change whilst providing a
sustainable financial base to manage risk and respond to future pressures. 
Recommendations
It is recommended that Policy and Strategy Committee: 
(1) Acknowledges the contents of this report.
(2) Approves the revised Reserves Policy.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 9
Page 183 of 216

Page 184

2. Report 
2.1 The purpose of this review is to ensure that the Council’s reserves continue to be
managed in a way that supports long-term financial sustainability, strategic service
delivery, and effective budget planning. Given the complexity of the financial landscape
and the scale of the Council’s ambitions, it is essential that reserves are aligned with
both short-term operational needs and medium/long-term strategic objectives. 
2.2 The review and refinement of the Council’s reserve policy aims to maintain a robust
financial foundation that enables the Council to manage risk, respond to emerging
pressures, and invest in transformational change. Specifically, the review has aimed to
achieve the following outcomes: 
• Set clear target levels for the Contingency Fund and reserves earmarked for future
budget pressures, in order to enhance transparency and financial resilience.
• Support a more strategic approach to savings delivery, recognising that future
savings are likely to be increasingly dependent on service redesign rather than
traditional cost cutting measures. The realisation that these types of savings
generally require a longer lead in time and temporary funding to support the change.
• Establish a procedure for the use of unallocated reserves, ensuring that any use is
linked to/set out as part of the Council’s budget setting process.
• Joins up the process of year end reserve positions and the Medium-Term Financial
Plan (MTFP), ensuring that reserve decisions are not made in isolation but are part
of a clear financial planning process. 
Current Position
2.3 The current Reserves Policy sets out the Usable Reserves that the Council hold and
provides further detail on their purpose and how they can be used. This covers
balances within the General Fund Reserve including Contingency Fund, Earmarked
Funds and Change Management Fund in addition to Housing Revenue Account,
Capital Fund, Insurance Fund, and Repairs & Renewals Fund. 
2.4 The governance around the use of reserves is also set out and currently: 
• Use of reserves must align with the Financial Strategy and be approved through
formal processes.
• Earmarked reserves require justification, a timeframe, and are reviewed annually
• Unused earmarked balances may be released back to the General Fund. 
2.5 The policy also highlights reserves are for one off use and should not be used for
recurring costs unless a certain permanent solution is in place.
Proposed Reserve Targets
2.6 The Contingency Fund is an uncommitted amount held for unexpected events or
emergencies. The level of funds held for contingency are reported by the S95 Officer
as part of the annual budget setting process.  Historically this has remained at a static
£8m however it is now considered that a more appropriate approach would be to link it
to the net revenue budget.  Applying a percentage contingency is more flexible and
aligns proportionately with the overall size of the organisation i.e. if Net Revenue
Page 184 of 216

Page 185

increases, the contingency adjusts to reflect this change.   It is recommended that the
council set aside 1% of its net revenue expenditure budget to a contingency fund.  This
is in line with the approach taken by other Local Authorities and reflects the Council’s
positive track record for budgetary control. 
2.7 Currently there is an amount set aside within earmarked reserves for Future Budget
Pressures.  It is proposed that this is also set based on a target to ensure that it is
reflective of the budget shortfall and provides an appropriate level of one off resources
to assist with smoothing the impact of service redesign, allowing lead in time for savings
and supports strategic service redesign rather than applying budget cuts. It is
recommended that an average of the 3 year budget gap should be set aside for this
purpose.  This would be set at the closing of the year end and be linked to the MTFP
prepared at the same time i.e. 2026/27 amount will be based on the June 2026 MTFP
budget gap forecast for 2027/28 – 2029/30. 
2.8 In previous versions of the Reserves Policy, the Change Management Fund (CMF)
represented the remaining unallocated General Fund balance to support one-off costs
linked to approved savings and the Voluntary Redundancy Scheme (VRS).  The need
for CMF has now been more closely aligned with financial planning through revenue
budget monitoring and the MTFP providing greater certainty over the level of resource
required to implement approved savings. 
2.9 The proposed Reserve Policy is shown at appendix 1.  This incorporates changes to
reflect the significant points above along with some minor amendments required to
reflect current council terminology and arrangements.  All changes have been
highlighted.   
3. Measures of success 
3.1 The Council continues to strike a balance between meeting current obligations and
preparing for future commitments or potential changes in funding levels.   
4. Supporting documentation 
Appendix 1 Reserves Policy 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 185 of 216

Page 186

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒
Page 186 of 216

Page 187

If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐       
Page 187 of 216

Page 188

RESERVES POLICY  
Page 188 of 216

Page 189

reserves policy  2
Document control
Title Reserves Policy
Owner Greg Telfer Contact TelferG@northlan.gov.uk
Governance Group Policy and Strategy Committee
Author Veronica Roberts Contact RobertsV@northlan.gov.uk 
Revision History
Number Originator Date Review Commenced Revision description/record of change             
Document Approvals
Number Governance
Group
Date approval granted Date approval to be requested 
(if document still draft) 
BMT  20 November 2025 
Policy & Strategy  4 December 2025     
Consultation Record (for most recent update)
Status of document consulted upon 
Stakeholders consulted/date 
Strategic Alignment 
Next review date
Review Date November 2026 
Page 189 of 216

Page 190

reserves policy  3
Table of Contents 
1. Background
2. Policy Objectives
3. Types of Reserves
4. Governance of Reserves
5. Assessment of Reserve Levels 
Appendix 1 Protocol for Establishment and use of Earmarked Reserves
Appendix 2 New Request to Earmark General Fund Reserves - Template 
Page 190 of 216

Page 191

reserves policy  4
Background 
This Reserves policy has been developed in line with Local Authority Accounting Panel (LAAP)
Bulletins issued in conjunction with the CIPFA Technical Enquiry Section.  The Guidance is also in
line with the requirements of the Code of Practice on Local Authority Accounting (the Code). 
The policy sets the guidelines which ensure reserves are established and managed in a way that
safeguards long-term financial sustainability and supports good financial management, allowing
the Council to balance current obligations and preparing for future commitments and financial
risks.
Policy Objectives 
The objectives of the Reserves Policy are to: 
• set out the types of reserves held by the Council and their purpose; 
• establishes procedures for governance of the reserves
• outlines the circumstances for the utilisation of reserve balances; and 
• outline the approach taken to determine the appropriate reserve levels held by the Council
Types of Reserves 
In Scotland there are explicit statutory powers under schedule 3 of the Local Government
(Scotland) Act 1975 permitting local authorities to establish a Renewal and Repair Fund, an
Insurance Fund and a Capital Fund alongside a requirement to maintain a General Fund (section
93 of Part VII of the Local Government (Scotland) Act 1973). 
Within the General Fund Reserve, Local Authorities can earmark elements for specific purposes. 
Reserves are categorised as either usable or unusable on the balance sheet depending on their
nature. Unusable Reserves are kept in order to manage accounting processes for non-current
assets, financial instruments and retirement benefits.  Usable Reserves include cash balances that
can be utilised by the Council as part of its financial strategy to ensure effective management of
the Council’s operations.   
Usable Reserves are held for three main purposes:
• Create a contingency to cushion the impact of unexpected events or emergencies. 
• Create a means of building up funds, referred to as earmarked reserves, to meet known
or predicted liabilities.
• Create a working balance to help mitigate the impact of uneven cash flows and avoid
unnecessary temporary borrowing. 
Table 1 below identifies the various Usable Reserves held on the Council’s Balance Sheet and
provides further information on their purpose.   
Page 191 of 216

Page 192

reserves policy  5 
General Fund
Reserve
This reserve is held to support service delivery and is made up
of the following funds:
• Contingency Fund which is an uncommitted amount held for
unexpected events or emergencies.  The level of funds held
for contingency are reported by the S95 Officer as part of the
annual budget setting process. This is set at 1% of Net
Revenue Expenditure budget. 
• Earmarked Funds for known specific commitments.  
• Change Management Fund is an earmarked portion of the
General Fund Reserve generally used to support the one off
costs associated with approved budget savings and
Voluntary Redundancy Scheme (VRS).
• Future Budget Pressures is an earmarked portion of the
General Fund Reserve targeted to representing the average
of the current 3 year budget gap used to assist where
required when supporting strategic service redesign to
smoothing service reductions.  
Housing
Revenue
Reserve
This reserve reflects the accumulated surpluses/ deficits of the
Housing Revenue Account.  The local authority housing
provision defined in the Housing (Scotland) Act 1987 requires
these funds to be accounted for separately from the General
Fund.  This reserve is held to support service delivery and is
made up of the following funds:
• Core Fund which is an uncommitted amount held for
unexpected events or emergencies and is reported as part of
the annual budget setting process.  
• Earmarked Funds for known specific commitments.  
• Change Management Fund is an earmarked portion of the
Housing Revenue Reserve generally used to support the one
off costs associated with approved budget savings and
Voluntary Redundancy Scheme (VRS).
• Unallocated Housing Revenue Reserve which represents the
remaining balance in any given year and may be considered
for use as part of a future year budget setting.
Capital Grants
Unapplied
Account
Shows the capital grants received by the Council in year but
has not yet been fully utilised.  These are held and used when
required and grant conditions fulfilled. 
Capital Fund
Reflects capital receipts from the sale of capital assets which
can be used to fund capital expenditure or finance loans fund
repayments associated with capital expenditure. 
Insurance Fund
This fund is held as a provision for outstanding claims and
unknown future events.  The reserve is used to cover current
and potential future claims funded out with active insurance
policies.  
Page 192 of 216

Page 193

reserves policy  6
Repairs and
Renewals Fund
Reflects funds which have been set aside to support
expenditure to be incurred from time to time in repairing,
maintaining, replacing and renewing any buildings, works,
plant, equipment or articles belonging to the authority.
Table 1
Governance of Reserves
Governance arrangements which will apply to Reserves are as follows:
General Fund Reserve – Contingency Fund
The Contingency Fund should be set at 1% of Net Revenue Expenditure budget. In the event that
the balance drops below this amount, Committee will be advised and a recovery plan to replenish
the Contingency Fund will be brought forward. The appropriateness of this level will be considered
annually and reported to Council as part of the Budget Setting process
General Fund Reserve – Earmarked Funds
There is no limit applied to the level of committed reserves which the Council can hold.  However,
all requests to earmark funds must be suitably supported by evidence and must demonstrate
alignment with the Financial Strategy and the Plan for North Lanarkshire. A Protocol for
Establishment and Use of Earmarked Reserves is attached at appendix 1. 
An annual review of all earmarked reserves will be undertaken by S95 officer in conjunction with
the relevant Chief Officer. The outcome of this process and subsequent updates in respect of
earmarked reserves will be presented to the Business Management Team each period and to
Finance and Resources Committee each cycle, as part of the overall revenue budget monitoring
arrangements. 
General Fund Reserve – Change Management Fund
Requirements for Change Management Funding will be assessed regularly, and will reflect change
programmes to be undertaken by the Council within a defined timeframe.  Updates will be
reported to the Business Management Team at each period and to Finance and Resources
Committee at each cycle as part of the overall revenue budget monitoring arrangements
General Fund Reserve – Future Budget Pressures
Requirement to set aside funds to support strategic service redesign ensuring a smooth reduction
to service budgets. This fund will be targeted to represent the average of the 3 year budget gap as
reported by the Medium Term Plan in the same year.   
Housing Revenue Reserves
All Housing Revenue Reserves are quantified and approved as part of the budget setting process,
with updates reported to the Housing & Communities Committee each cycle as part of the revenue
monitoring report. 
Capital Grants Unapplied Account
This funding is held for a specific purpose and is available for drawdown when expenditure is
incurred in accordance with any grant conditions.
Page 193 of 216

Page 194

reserves policy  7 
Capital Fund
All capital receipts will be applied to the Capital Fund unless otherwise approved (e.g. as part of
approved business case or through the capital programme) to fund loan principal repayments.
Insurance Fund
The fund balance is reported as part of the annual accounts process.  Use of this fund is managed
on an ongoing basis throughout each financial year in accordance with requirements. 
Repairs and Renewals Fund
Funds can be set aside to support repairs and renewals expenditure, which are available for
drawdown as required. 
Reserve balances represent one-off funding, therefore use of reserves for recurring revenue
expenditure or to balance the budget, is unsustainable.  However the Section 95 officer retains
the right to use reserve balances where deemed appropriate for example to smooth the impact
of budget reductions required in response to reduced funding levels.  In the event that reserves
are used to meet short term funding gaps, there must be evidence of plans in place for a
permanent funding solution.
Assessment of Reserve Levels
Both the Reserves Policy and Reserve Balances should be reviewed annually to ensure reserves
are maintained at an adequate and appropriate level and that robust governance arrangements
are maintained.     
Setting the level of reserves is one of a number of related decisions in the ongoing development
of the Council’s MTFP and subject to review as part of the year end process and budget setting
process.  In establishing and approving the MTFP the Council will ensure that it maintains a
prudent level of reserves in line with best practice and relevant guidelines.  Any surplus reserves
will be considered in the light of the budget forecast and the risks associated with that forecast.   
In determining the level of reserves all strategic, operational and financial risks facing the Council
should be assessed including both internal and external risks.  As a minimum the S95 Officer
should consider the following: 
• The overall financial standing of the Council including: level of borrowing;
outstanding debt; council tax collection rates
• The Council’s track record in budget and financial management 
• The robustness of the Council’s MTFP and assumptions contained;
• The Council’s capacity to manage in year budget pressures;
• The strength of financial information and reporting arrangements; 
• Fluctuations in inflation and interest rates and their impact on future years
budgeting. 
The S95 Officer should include a statement within the Budget Report highlighting the estimated
opening General Fund balance for the year, the additions to/withdrawal from balances and the
estimated end of year balance.   
Page 194 of 216

Page 195

reserves policy  8
APPENDIX 1 
Protocol for Establishment and Use of
Earmarked Reserves 
Establishing Earmarked Reserve 
The requirement for the establishment of an earmarked reserve will be considered as part of the
financial year end process.
Funds may be earmarked if they relate to a financial commitment that has not yet been realised,
does not meet the criteria for accrual or provision, and there is clear justification why the
obligation does not meet the criteria.  Examples of this could include: 
• Dilapidations where there is an obligation to return rented property to its original state
prior to termination of the lease. 
• Devolved School Management funds are retained by the School however are
accounted for within the Council’s overall surplus or deficit for the year; therefore
require to be earmarked for return to the school.
• Support for investment in Council projects where a business case is presented 
New requests to earmark funds for future use should be made to the S95 Officer by the relevant
Chief Officer, using the template provided at appendix 2.  This requires confirmation of the amount
to be earmarked, clear justification of why the monies are required and the timeframe for use of
the balance.  In the case where the request is to assist with a recurring burden, details should be
provided of how the Service plan to replace the funds in future years.   
The S95 Officer will make a decision on each request to earmark funds in the context of the need,
and the risk to the financial sustainability of the Council.   
If approved, the Chief Officer will maintain records of the use of funds.  Where the reserve is used
for a shortfall in funding, the Chief Officer must provide periodic updates on the plans for replacing
the funds in future years along with updates on projected spend against approved earmarked
reserves through their revenue monitoring report.  In addition the S95 Officer should be notified
immediately if the monies are no longer required and can be released. Typically the earmarked
reserve should not be held for more than 2 years unless supported by a business case.   
As part of the year end close down, the S95 officer should be provided with the final position for
the year clearly identifying opening balance and spend in the year. Where funds are required to
be carried forward, full justification must be provided otherwise any remaining balance on the
reserve will be released to the unallocated General Fund balance. 
Page 195 of 216

Page 196

reserves policy  9
APPENDIX 2
New Request to Earmark General Fund
Reserves 
Service:  
Division:  
Chief Officer: 
Earmarked Reserve Name: 
Description of Use: 
Amount Requested: 
Timeframe for Use:
(If use spans more than one
financial year, please provide
indicative spend per year) 
Reason for Request:
(Include details of alternative
funding options considered) 
Plans to replace funds:
(appropriate where fund is
being earmarked to cover a
recurring burden) 
Signed: 
Date:
Page 196 of 216

Page 197

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/VR Date 04/12/25 
Community Investment Fund – Annual Update 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail telferg@northlan.gov.uk Telephone 
Executive Summary
In September 2018, the ‘We Aspire – A Shared Ambition for North Lanarkshire’ report
presented to Policy and Resources Committee outlined proposals for the establishment of
the Community Investment Fund (CIF). The ambition was to target the creation of
additional resources of £500m over a 10-year period to support new capital expenditure in
North Lanarkshire’s communities. The investment would be funded through ring-fencing
elements of future council tax income associated with the growth in housing and top slicing
an element of future council tax increases. 
The previous update presented to Policy and Strategy Committee in December 2024
presented various scenarios projecting a potential estimate of funding available over a
revised 10-year period to 2033/34.    Following the Full Council decision in February 2025
to increase council tax by 10%, with 2% ringfenced for CIF, the projected value of the Fund
from inception was £1,006.081m. This included £847.970 million over the revised 10-year
period.  This position has since been reflected in the updated year 2 of the 5-year Strategic
Capital Investment Programme from 2024/25 to 2028/29 approved at Policy and Strategy
Committee in March 2025. 
Earlier in this Committee agenda the Council Tax Strategy paper highlighted that to support
members with planning and decision making the Section 95 Officer recommends, for
illustrative purposes only, that future Financial Outlooks and CIF modelling will reflect
Scenario B, a 10% Council Tax increase to 2027/28 with 2% ring fenced for CIF.  The
Council Tax level will ultimately be a decision for members when setting the budget, with
the financial impact that differs from such illustrations also reflected. 
Assumptions underpinning the CIF funding projections have been reviewed and updated
where necessary. The revised forecast now estimates £834.732 million over the 10-year
period to 2033/34 or £992.834m since the funds inception, representing a small reduction
of £13.247 million, primarily due to an increase in the assumption of the long-term PWLB
borrowing rate. 
The updated CIF projections will be incorporated into planning for the annual Strategic
Capital Investment Programme budget updated for the 2024/25 to 2028/29 programme
due to be presented to Policy and Strategy Committee in March 2026.   
Item 10
Page 197 of 216

Page 198

1. Background 
1.1 In September 2018, the ‘We Aspire – A Shared Ambition for North Lanarkshire’ report
presented to Policy and Resources Committee outlined proposals for the establishment
of the Community Investment Fund (CIF). The ambition was to target the creation of
additional resources of £500m over a 10-year period to support new capital expenditure
in North Lanarkshire’s communities. The investment would be funded through ring-
fencing elements of future council tax income associated with the growth in housing
and top slicing an element of future council tax increases. 
1.2 The CIF aims to support the Council’s aspiration to make North Lanarkshire the place
to Live, Learn, Work, Invest and Visit, with a shared ambition for inclusive growth and
prosperity for all. Investment linked to CIF will be targeted towards tackling the barriers
to growth by unlocking the potential in the most deprived areas, breaking the cycle of
poverty and opening up opportunities to create more equal communities. 
1.3 The new investment aims to accelerate the delivery of ambitious plans for community
investment and service delivery underpinned by community involvement and
partnership whilst supporting the generation of future budget savings and supporting
economic regeneration activity throughout North Lanarkshire. 
1.4 Several updates have been presented to Policy and Strategy Committee with the most
recent update provided in December 2024. That update provided a revised estimate of
the potential funding available based on various scenarios tied to the Council Tax
Strategy as well as projecting for a revised 10 year funding period to 2033/34. 
1.5 The Council budget for 2025/26 set aside 2% of the 10% Council Tax increase to
support CIF ambitions.  This resulted in a projection of funding available of £847.979m
over the revised 10-year period. As a result, the Community Investment Fund
contributes around 53% of funding for the core strategic capital investment programme
with the core capital grant contributing just 13%. 
1.6  To date, the Community Investment Fund has been a major contributary factor in record
investment across North Lanarkshire’s communities. A summary of the 2024/25
financial year programme delivery highlights in shown in Appendix 1.   
Recommendations
It is recommended that Policy and Strategy Committee: 
(1) Acknowledges the updated assumptions highlighted in the report and the slight
reduction in available CIF resources of £13.247m over the 10-year period.
(2) Acknowledge that the updated funding profile will be incorporated into planning for
annual Strategic Capital Investment Programme budget updated for the 2024/25 to
2028/29 programme due to be presented to Policy and Strategy Committee in March
2026. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work Statutory / corporate / service requirement
Page 198 of 216

Page 199

2. Report 
2.1 As previously highlighted, the Community Investment Fund has two main forms of
funding: forecast growth in Council Tax income which is directly linked to the Council’s
ambition for economic growth; and the ring-fencing of 1% of future Council Tax
increases. 
Ring-fenced Council Tax
2.2 The Council decision to increase Council Tax by 10% in 2025/26 and set aside 2% for
CIF has been reflected in the updated modelling. 
2.3 The Council’s current Medium Term Financial Plan (MTFP) was presented to Policy
and Strategy Committee in June 2025 and assumes that 2% of Council Tax rises will
continue to be set aside to support CIF up to and including 2027/28 and will revert to
1% thereafter. The MTFP also highlights a significant funding gap from 2026/27 to
2030/31 which will require Elected Members to make difficult decisions to obtain
balanced budgets in the years ahead.  It also assumes no national policy interventions
to support a Council Tax freeze. 
2.4 The latest CIF projection reflects the anticipated Council Tax increases of 10% to reflect
the Section 95 Officer recommendation per the Council Tax Strategy. 
Council Tax Growth
2.5 In assessing the potential for future CIF resources, Finance uses a variety of tools to
assess potential Council Tax growth. The following is a summary of the current
analysis: 
Council Tax Monitoring
2.6 Finance produces monthly monitoring information on the movement in the Council Tax
base using data from the Council Tax system on the numbers of properties at each
band, adjusted for any exemptions and discounts applied. For ease of comparison, the
total number of properties is represented as Band D equivalents. 
2.7 The Council’s Tower Reprovisioning programme has temporarily affected anticipated
growth in the Council Tax base due to timing. The properties being replaced were
typically in the lower Council Tax bands and will be substituted with higher band
properties in the future.  As this impact is short-term, assumptions for Band D equivalent
growth remain unchanged from the previous update, though this will continue to be
closely monitored for future updates. 
New Build Development Monitoring
2.8 The Place service has developed a suite of metrics to support the monitoring of new
build development that includes the volume of planning applications granted, the
numbers of building warrants granted by Building Standards (approval for construction)
and the number of completion certificates issued by Building Standards. 
2.9 It is worth noting that the trends in these areas would not ordinarily lead to an
amendment of projected housing growth in the CIF modelling but could provide a sense
of confidence in the housing market in North Lanarkshire. 
Investment Factor
2.12 As outlined in previous CIF update reports, one of the key factors in determining
potential funding available is the investment factor. This investment factor is determined
by considering the prevailing interest rates available to the Council and the length of
time the borrowing is repaid. 
Page 199 of 216

Page 200

2.13 Forecasted loan pool rates have increased due to revised long term interest rate
assumptions. The base rate is now expected to peak at 3.75% (previously 3.00%), with
higher projected PWLB rates. Consequently, forecast loan rates for 2025/26 are
expected to be 5.00%, reflecting an investment factor of 17.1591. Latest information
available suggest that these will slightly rise up to 2028/29 however given ongoing rate
volatility and prior prudence built into previous CIF models, the investment factor of
17.1591 will be applied to the remainder of the 10 year period. The 2025/26 capital
programme outturn and any slippage will be reviewed before updating the 5 year
Capital Investment Programme, allowing absorption of the slightly lower rate.
Projections remain subject to economic conditions, PWLB availability, and active debt
management. 
Impact on Capital Resources
2.16 In summary, the positive impact of revised Council Tax increase assumptions, partially
lower than anticipated council tax base growth in 2025/26 and marginal reduction in
investment factor means there’s a slight decrease in resources of £13.247m over the
revised 10-year period. 
Sensitivity Analysis
2.23 Given the number of variables affecting CIF modelling there are a number of risks and
uncertainties associated with the various assumptions being made. A significant
deviation from any of these assumptions could have an impact on the level of resources
available. The following analysis illustrates the impact of changes in each of the factors: 
• Future increases in Council Tax
The Council formally agreed to set aside 2% of Council Tax increases in 2025/26
with a capital planning assuming this level of ring-fencing would continue for a
further two years for financial years 2026/27 and 2027/28. 
The setting aside of Council Tax increases is dependent on future decisions of the
Council. A Council decision to set aside only 1% for CIF rather than 2% in 2026/27
and 2027/28 would reduce available funding by £75.729m up to 2033/34. 
• The level of future housing growth
The level of new housing development is significantly influenced by the strength of
the economy. With the ongoing impact of cost-of-living pressures and higher cost
of borrowing, there is an ongoing risk that this will have an impact on the level of
new housebuilding. 
No Council Tax growth across the CIF planning period above the £1.000m required
to support the Medium-Term Financial Plan would reduce available resources to
2033/34 by £276.345m. 
• Prudential borrowing factors
The model assumes an interest rate of 5% will apply for 2025/26 and for the
remainder of the modelling timeframe.  This will be subject to a degree of volatility
linked to the health of the economy, the availability of borrowing at PWLB rates
and the ability for the Council to continue to proactively manage its loan debt
profile.   
An increase in the average rate of borrowing to 6.5% would reduce overall funding
available by £140.541m. Alternatively, a reduction to 3.92% would increase CIF
resources by £195.738m. 
Page 200 of 216

Page 201

3. Measures of success 
3.1  Success will be evidenced through the development of projects and programmes of
activity funded through the Community Investment Fund and their impact on the
communities of North Lanarkshire.   
4. Supporting documentation 
4.1 Appendix 1 – Community Investment Fund – 2024/25 Programme Delivery Highlights
4.2 Appendix 2 – Community Investment Fund model – Updated 10-year Projection 
Greg Telfer
Chief Officer (Finance and Technology)
Page 201 of 216

Page 202

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
The financial impacts are outlined throughout the report. The updated funding
profile will be incorporated into the revised Strategic Capital Investment
Programme 2024/25 to 2028/29 for consideration by this Committee in March
2026. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐   
Page 202 of 216

Page 203

5.6  Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The sensitivity analysis outlined in the report highlights the impact of significant 
variations in the assumptions underpinning the CIF model. The governance and 
monitoring arrangements put in place will ensure that risk is managed across CIF 
programmes, including through the Council’s revenue budget, capital planning and 
treasury management strategies and consideration by the Council’s Strategic Capital
Delivery Group.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒
Page 203 of 216

Page 204

If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 204 of 216

Page 205

Appendix 1
Community Investment Fund – 2024/25 Programme Delivery Highlights
Assets and Procurement Place
• Office Rationalisation – both the Buchanan Centre
project and refurbishment of 2 floors of the Civic Square
have been completed following extensive works including
reconfiguring spaces and IT upgrades
• All works completed in the 26 Non Domestic Energy
Efficiency (NDEE) sites
• Town and Community Hubs 
o Newmains – defect period completed with the final
account almost agreed.
o Chryston CH – defects period is ongoing. Retention
continued to be held by NLC. Final account ongoing.
o Riverbank – defects period completed, latent defects
being addressed by HubSW. Ongoing final account
discussions taking place. 
o Orbiston CH – works continue onsite, target
handover October 2025.
o Gartcosh CH – started on site in January 2025.
Enabling works commenced in October 2024. Main
construction works ongoing
o St Kevins CH – started on site in September 2024,
target handover February 2026.
o St Stephens CH – started on site March 2025.
o Chryston HS – Enabling works took place in Q4
2024, main contract works commenced April 25.
o Glenboig CH – minor feasibility work undertaken 
o Abronhill CH – minor feasibility work undertaken 
• Active and Creative – Boiler upgrade at Wishaw Sports
Centre, along with significant rewiring, lighting, and
heating replacements at Kilsyth Library.  Thorough
condition survey works for the swimming pool facilities
have also been completed. 
• Final works completed at Woodlands, Kilsyth and St
Aidan's PS MUGA projects. A new MUGA has been
installed at St Mary's PS in Cumbernauld. 
• A total of 5 new Active Travel Hubs have been installed
across the authority along with 3 grass pitch upgraded to
new synthetic pitches.
• Creation of 7 outdoor cabins or polytunnels at Stane PS,
Holy Family PS, Noble PS, Ladywell PS, Dykehead PS, 
St Mary's, Cleland and St Lucy's PS
• Bothwellpark/St Aidan's LCSC & EYs Assessment
Centre on track for completion end of June 2025.  One
children's house kitchen and all bedrooms and en-suites
upgraded.  Works to existing Carnbroe PS to repurpose
PS to ASN secondary ongoing with expected completion
in October 2025.  Dalziel HS lift installed.  
• EALR Business Case approved by GCR Cabinet in
August 2024.  
• Eurocentral Strategic Active Travel (phase 1 and 2
detailed design and phase 3 concept design) contract
awarded and well underway. Phase 1 and 2 detailed
design remains ongoing - due to complete by December
2025
• RAIS demolition complete March 2025
• Town Action Plans for Bellshill, Kilsyth and Shotts were
finalised. 
• Draft Investment Plan for Coatbridge has been produced
and is subject to further community engagement. 
• Progress continues with redevelopment of Cumbernauld
Centre as planned.
• Various puffin upgrades undertaken throughout North
Lanarkshire, including 2 toucan crossings and 1 major
junction upgrade.
• Complete designs of 5 and construction of 2 road safety
schemes. Construction priorities determined by annual
accident cluster reports.
• 6 Preliminary / Detailed designs and 2 active travel
construction projects complete. Construction has also
started on 3 other active travel projects. Priorities to be
determined by active travel strategy. 
Community Operations Business and Digital
• Purchase and upkeep of equipment for play areas
• 256 New Lairs Delivered in Coltswood cemetery before
end of 24/25, and available for use
• Cambusnethan cemetery drainage improvements and
footpath improvements
• 367 Lighting Columns replaced, 10,935 lighting columns
inspected, 18.25 km of carriageway resurfaced, 6.07km
of footway resurfaced. Condition surveys undertaken for
full carriageway network and full VRS asset register
• 1,095 corporate laptops procured and 800 schools
laptops refreshed
• W360 upgrade completed 
Strategic Communications and Engagement
• Completion of 67 projects including 20 play facilities, 26 road surfacing, 9 environmental projects, 10 heritage projects
and 2 community safety projects. 
Page 205 of 216

Page 206

Appendix 2
Community Investment Fund – 10% Council Tax rise and 2% ring-fenced in 2026/27 and 2027/28 
Assumptions:
1. “As is” Growth – historically, the Council Tax Band D equivalent properties has averaged around 1,700 per annum. This model assumes this growth will reduce by 5% per annum
2. Growth from ambition – modelling assumes that additional housebuilding linked to the Plan for North Lanarkshire rise by an additional 10% per annum. 
3. Reductions in growth applied to reflect anticipated slowdown associated with COVID-19, Brexit and Cost of Living economic impacts. There has been no change to these
assumptions since the last CIF update. 
4. 10% Council Tax increase assumed for 2026/27 and 2027/28 with 2% ring-fenced from each of those years. Thereafter it reverts to 5% annual increase with 1% ring-fenced. 
5. Investment Factor assumed to be 17.1591 from 2025/26 based on an interest rate of 5% over 40 years. Due to the volatility of interest rates, the investment factor will continue to be
reviewed as part of the update to the 5 year Capital Investment Programme to be report to Policy & Strategy Committee in March 2026.  
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Prior Years 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 Total
Raised from Ambition - Growth in Band D Equivalents:
"As is" Growth 6,330 1,399 1,332 1,269 1,208 1,151 1,096 1,044 994 947 902
Growth from ambition 993 399 439 483 531 585 643 707 778 856 942
Impact of economic slowdown (3,510) (896) (38) 221 5 (375) (637) (200) (200) (200) (200)
Anticipated Increase in Band D equivalents 3,813 902 1,733 1,973 1,745 1,360 1,102 1,551 1,572 1,603 1,643 18,996
Council Tax Charge for Band D 5,021 1,321 1,453 1,598 1,758 1,846 1,938 2,035 2,137 2,244 2,356 23,708
Total Additional Council Tax Income from growth (£000) 4,817 1,191 2,518 3,153 3,068 2,510 2,136 3,157 3,359 3,596 3,871 33,376
Less assumed 3% non-collection (£000) (145) (36) (76) (95) (92) (75) (64) (95) (101) (108) (116) (1,001)
Less amount assumed in Long Term Financial Plan (£000) (3,678) (1,000) (1,000) (1,000) (1,000) (1,000) (1,000) (1,000) (1,000) (1,000) (1,000) (13,678)
Amount available for Community Investment Fund (£000) 995 155 1,442 2,059 1,976 1,435 1,072 2,062 2,259 2,488 2,755 18,697
Raised from Council Tax increases:
Additional income from Council Tax increase 18,052 5,160 19,105 21,016 23,117 12,137 12,743 13,381 14,050 14,752 15,490 169,003
Amount available for Community Investment Fund (£000) 2%
set aside up to 2027/28, 1% thereafter
6,017 1,720 3,821 4,203 4,623 2,427 2,549 2,676 2,810 2,950 3,098 36,896
Total estimated additional income for Community Investment
Fund (£000)
7,012 1,875 5,263 6,262 6,599 3,863 3,621 4,738 5,069 5,438 5,853 55,593
Investment Factor (revenue funding converted to capital) 82 17.7630 17.1591 17.1591 17.1591 17.1591 17.1591 17.1591 17.1591 17.1591 17.1591
Total Capital Funding Available 158,102 33,310 90,316 107,448 113,237 66,277 62,126 81,301 86,972 93,317 100,429 992,834
CIF Resources Assumed for 5-year Capital Programme 158,102 33,310 93,121 110,818 116,805 66,709 62,488 81,919 87,587 93,994 101,228 1,006,081
Difference 0 0 (2,805) (3,370) (3,568) (432) (362) (619) (615) (677) (798) (13,247)
Page 206 of 216

Page 207

Contract Award for Project Manager and Quantity Surveying Services
for Glenboig Community Hub
North Lanarkshire Council
Report 
Does this report require to be approved? ☒ Yes ☐ No
Ref: MMcB/JMCK Date: 4/12/2025 
From James McKinstry, Chief Officer (Assets and Procurement)
Mark McBride, Property
E-mail mcbridemark@northlan.gov.uk Telephone: Manager (Estate Development)
07583094928 
Executive Summary 
In accordance with the councils General Contract Standing Orders (GCSOs), the Committee is
asked to approve the award of a contract for Project Manager and Quantity Surveying Services for
Glenboig Community Hub (the ‘Agreement’) following the undertaking of a procurement procedure
as detailed within this report below. 
Recommendations 
It is recommended that the Policy and Strategy Committee: 
(1) Approves the award of the Agreement to Gardiner & Theobald LLP (the “Contractor”) at the
maximum value of Six Hundred and Seventy Three Thousand, Nine Hundred and Sixty
Pounds and Seventy Four Pence (£673,960.74) exclusive of VAT across the Agreements
full term which is made up of an initial period of 60 months that is anticipated to commence
on 12 January 2026 with the council reserving the right to extend the Agreement for
additional periods up to a maximum of a further two individual 6 month periods. 
1. Background 
1.1 Glenboig Primary School requires a new build primary school due to significant levels of
housebuilding in the Glenboig area. The existing primary school will reach operational
capacity as the school roll continues to increase as the proposed housebuilding comes
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Transforming Places
Policy and Strategy Committee
Item 11
Page 207 of 216

Page 208

forward. The existing primary school is within the council’s Education 2010 PPP Estate and
is operated by Transform Schools North Lanarkshire (TSNL). 
1.2 In tandem with procuring and developing Glenboig Community Hub, the Hub Delivery Team
are also managing the procurement and construction of temporary accommodation at the
existing facility to accommodate the school roll until the construction of the new facility is
complete. 
1.3 Funding was approved in March 2024 at Policy and Strategy committee for the development
and construction of Glenboig Community Hub. 
1.4 This procurement exercise seeks to appoint Project Manager and Quantity Surveying
services to support the development and construction of the community hub.
1.5 A Direct Award via Scotland Excel’s Building Construction Consultancy Framework (ref:
0920) was determined as the most appropriate route for appointment of Project Manager and
Quantity Surveying services. Lot 4 of this framework agreement has been utilised and this is
in place until April 2027. 
1.6 The Contractor has been chosen as the most appropriate as they are familiar to the council
and have worked on multiple community hubs with the council previously. Their knowledge
and experience of working with the Hub Delivery Team developing and construction
community hubs has been demonstrated. They are available to start work as soon as they
are appointed which will provide programme benefits and contribute to overall cost
management by ensuring additional inflationary periods are not added to the overall contract
value for the construction of the community hub. 
1.7 Furthermore, programme benefit will also be of advantage when installing temporary
accommodation at the existing Glenboig Community Hub. The agreement between TSNL
and the council for the temporary accommodation is for a maximum period of five years and
it’s imperative that the programme for the construction of Glenboig Community Hub is driven
to meet these dates.
1.8 The Contractor is a well-established organisation and are well known in the industry for
providing Project Manager and Quantity Surveyor services. They also have access to cost
data and market insight information from UK wide sources which can directly support the
councils Glenboig Community Hub project. 
1.9 To enable appropriate development and execution of the procedure required to form the
Agreement, a panel of technical and procurement representatives (the “User Intelligence
Group (UIG)”) was formed. 
1.10 The UIG were responsible for developing the required internal contract strategy (the “Contract
Strategy“) for the Agreement. The Contract Strategy sets out the parameters and approaches
the council would apply within the procurement, tendering, contracting and end of life stages
of the Agreement following appropriate analysis, research and investigation to ensure the
council achieves maximum benefit where possible. 
2. Report 
2.1 The procurement procedure was undertaken as a “Direct Award”. A Direct Award is a
procurement procedure where an overarching framework agreement allows the council to
directly engage and contract with an appointed contractor that has already went through a
full competitive procurement procedure in a more efficient manner as per the framework
agreements terms and conditions.
Page 208 of 216

Page 209

2.2 Within the associated Contract Strategy for the Agreement, the overarching framework
agreement and determination of whether Best Value was achievable via the Direct Award
procurement, the recommended Contractor was identified, engaged and issued an invitation
to tender to formalise the Agreement. 
2.3 The tender received from the recommended Contractor underwent appropriate appraisal to
ensure it was complete / compliant with the council’s requirements and demonstrated Best
Value. 
2.4 Appendix 1 provides a summary of the procurement procedure undertaken including the key
considerations and outcomes. 
Financial / Budget Consideration 
2.5 The pricing section of the tender has been assessed, and the evaluators have confirmed that
it is arithmetically correct and free from errors/omissions and within the pre-tender budget. 
2.6 The costs associated with delivery of the Agreement will be contained within the Capital
budget for the Hub Delivery Team within Assets and Procurement. 
Price Stability 
2.7 The Contractor submitted a fully priced Activity Schedule with their tender return. The
tender price submitted is a fixed cost price and is only variable via a contract instruction. 
2.8 The council has various projects with similar consultancy services which have been procured
via historic routes to market. It also has access to framework rates from Scotland Excel and
other publicly available frameworks which were used to benchmark the tender return from
the Contractor to ensure best value. 
Community Benefits 
2.9 The council is committed to maximising the delivery of community benefits. The procurement
included a community benefit requirement, this approach is designed to deliver local
community benefits where possible. 
2.10 Within their tender, the recommended Contractor committed to deliver community benefits
as detailed within Appendix 1 of this report. 
Fair Work First and Payment of the Living Wage 
2.11 Within their tender submission to obtain appointment to the overarching framework
agreement the recommended Contractor intimated that they would commit to progressing
through the Real Living Wage accreditation scheme process. 
2.12 Further information on the Living Wage status of the recommended Contractor is detailed in
Appendix 1.
Page 209 of 216

Page 210

Contract Management 
2.13 Officers from the Hub Delivery Team within Assets and Procurement will be responsible for
managing the Agreement which will be undertaken in accordance with the contract and
supplier management conditions applied within the Agreement. 
3. Measures of success 
The Agreement will deliver the following outcomes; 
3.1 Best Value will be demonstrated as outlined in Appendix 1; 
3.2 The appointment of an experienced Contractor who has the experience and capability to
deliver a high-quality service to the council which will contribute to the mitigation of the
projects overall risk profile and overall project success. 
3.3 A completed procurement procedure which is compliant with the relevant procurement
legislation, overarching framework agreement and councils General Contract Standing
Orders. 
3.4 Secure an enhanced range of community benefits which align to strategic objectives and are
compliant with the over-arching Scotland Excel framework agreement. 
4. Supporting documents 
4.1 Appendix 1 Summary of Procurement Procedure 
James McKinstry
Chief Officer (Assets and Procurement) 
Page 210 of 216

Page 211

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Scotland Excel has assessed Fair Work First principles when Contractors were appointed
to the framework. The Contractor is bound by these principles during their time on the
relevant framework agreement. 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact   
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Available budget is contained with the Town and Community Hub capital programme.
Glenboig Community Hub and associated professional services was recently granted
approval to proceed to procurement in September 2025 via the Town and Community
Hub Steering Group.
5.3 HR policy impact   
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact   
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
All procurement procedures will have potential legal implications however throughout this
Agreement, compliance with the councils General Contract Standing Orders and the
relevant procurement regulations has been maintained with advice from colleagues in
Corporate Procurement and Legal Services sought as and when required. 
Legal Services reviewed and advised on the contract terms that the Contractor has been
procured with. No amendments to these terms were proposed by Legal Services or the
Contractor.
Page 211 of 216

Page 212

5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal data?
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☒
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk
Yes ☒ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)?
Yes ☐ No ☒
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
Programme risks are managed via Figtree. Specific project risks will be managed via
project risk register and regularly reviewed to ensure effective risk management and
mitigation.
5.10 Armed Forces Covenant Duty
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)?
Yes ☐ No ☒
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services.
Page 212 of 216

Page 213

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from the
United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out? 
Yes ☐ No ☒
Page 213 of 216

Page 214

Appendix 1 – Summary of Procurement Procedure 
Overview
Reference NLC-SLP-25-056
Title Project Manager (PM) and Quantity Surveying (QS) Services for Glenboig Community Hub
Classification Services - Standard
Responsible Chief
Officer and Position James McKinstry, Chief Officer (Assets and Procurement) 
Competition
Governance by Value Overarching Framework Agreements terms and condition in accordance with the Councils General Contract
Standing Orders
Route to Market Direct Award from a Third-Party Framework Agreement
Framework Agreement
Title, Ref and Lot Info Scotland Excel’s Building Construction Consultancy Framework (Ref 0920) – Lot 4 Quantity Surveying
Interest No. of Lot / Framework
Agreement Appointments
Lot 4 has 10 framework
appointments
Date ITT Package Issued
(If Applicable) 18 September 2025
Direct Award Basis Best Value Assessment of Framework Contractors in Accordance with the Framework Agreement 
How Has “Best Value”
Been Demonstrated?
Best value has been considered throughout the development of this contract opportunity and best value has been
demonstrated as follows:
• The Contractor is an established Contractor which has vast experience working within the construction
industry in Scotland, building educational establishments and they have an ongoing working relationship with
the council.
• Team proposed by the Contractor is familiar to the council and they already have established working
relationships with the Hub Delivery Team and Forward Planning Team. All staff proposed are suitably
qualified, with the lead senior staff holding chartered professional qualifications in their relevant fields.
• To mitigate overall risk, when considering new routes to market, the appointment of an existing Contractor
who already has working knowledge of Community Hub projects and the council’s construction requirements
was important.
• Community Benefits offered by the Contractor are in line with the Scotland Excel terms and conditions. This
will contribute to the wellbeing within the council area and they will be required to work with the council to
support the councils economic and social objectives. Page 214 of 216

Page 215

• Through framework terms and conditions, they are required to not exceed the framework rates and a
benchmarking exercise was undertaken to ensure best value was achieved.
• Contractor has access to cost data utilising their internal Market Insight team to provide macroeconomic
information and cost benchmarking from across the UK to support the development of Glenboig Community
Hub.
Additional Comments N/A 
Award Details 
General Overview  Total / Maximum Value  £673,960.74  Contract Duration
(Months)
60 months (with option to
extend for further 2
individual 6 month
periods)
Contractors
Registered Name(s) Gardiner and Theobald LLP
Contractor Overview Registered Local Authority
Area Camden Contractor(s) Size Large
Living Wage Paying the Living Wage Yes Living Wage Accredited No 
Overview of
Community Benefits
For each year of the contract, the following community benefits have been offered as part of the tender process:
• 2 x business training to SME’s or voluntary sector within Local Authority Area. This could include finance,
marketing, tendering, procurement or HR training.
• 1 x active support to any initiative designed to support those in poverty within the Local Authority area.
• 2 x educational presentations to school children within the Local Authority area.
• 2 x consultancy support to a community partner within the Local Authority area. 
Note that all the above community benefit opportunities are in line with Scotland Excel’s framework provision. G&T
will have the opportunity to work with the council to finalise the community benefits offering upon award of the
contract. They have exceeded the community benefit offering required of them under the terms of Scotland Excel’s
framework. 
Additional Comments
Within the original tendering process for the Scotland Excel framework, Fair Work First formed part of the quality
criteria with additional information and detail requested in terms of payment of the Living Wage, accredited status
etc. As this was included within the original tendering process, it cannot be reopened and or / rescored as part of
this procurement process however all original commitments by Gardiner & Theobald LLP (payment of the living
Page 215 of 216

Page 216

wage and commitment to progress through the Real Living Wage accreditation scheme process) shall be
applicable to this contract. 
Impacts
Summary,
Public Sector
Equality Duty
and Fairer
Scotland Duty 
☒ HR Policy
Impact  ☐  Data Protection
Impact  ☐  Environment /
Carbon Impact  ☐  Risk Impact  ☒
Children’s
Rights and
Wellbeing
Impact 
☐
Financial
Impact ☒ Legal Impact ☒ Technology /
Digital Impact ☐ Comms impact ☐ Armed Forces
Covenant Duty ☐ 
Page 216 of 216