Agenda Document Pack - Policy and Strategy Committee - 05/06/2025

North Lanarkshire Council · 5 June 2025
Back to Policy and Strategy Committee — 5 June 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

27 May 2025 
Members of the 
Policy and Strategy Committee
Chief Executive’s Office
Rachel Blair
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Policy and Strategy Committee is to be held in the
Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Thursday, 05
June 2025 at 14:00 PM which you are requested to attend. 
The agenda of business is attached. 
Rachel Blair
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Mark Hamill
Clerk Telephone: 07811294702
Clerk Email: committee@northlan.gov.ukk 
J Logue, T Fisher, L Roarty, C Barclay, A Beveridge, H Brannan-McVey, A Bustard, T
Carragher, C Costello, P Di Mascio, K Duffy, W Goldie, D Johnston, J Leckie, G Lennon, H
Loughran, M McBride, M McPake, L Nolan, G Robinson, A Smith, A Stubbs, R Sullivan, S
Watson, G Woods.  
Page 1 of 174

Page 2

Page 2 of 174

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000   
Operational   
2 Annual Communications Review and Evaluation
Submit report by the Chief Officer (Strategy and
Engagement) setting out the annual update. 
5 - 54 
3 Leadership and Operating Model - Phase 2
progress update
Submit report by the Chief Officer (Strategy and
Engagement) (1) providing an update on the progress
of the Leadership and Operating Model over the last 6
months; (2) advising of the service uptake in the
Community Hubs; and (3) seeking approval of the
plans and direction set out in the report. 
55 - 96 
4 Demonstrating Best Value in Transformation
Submit report by the Chief Officer (Strategy and
Engagement) (1) providing an update on the audit of
transformation and the evidence provided; and (2)
highlighting the national approach to auditing Best
Value, the theme of transformation for the year three
Best Value audit work, and the context and evidence
put forward by the council to support the audit. 
97 - 120 
5 City Deal Programme - East Airdrie Link Road
Update
Submit report by the Chief Officer (Place) (1) detailing
the progress made to date on the East Airdrie Link
Road; (2) highlighting the next key milestones; and (3)
seeking approval to include the Towers Road link within
the East Airdrie Link Road Project. 
121 - 132  
Financial   
6 UK Shared Prosperity Fund - Annual Update 2024-
25
Submit report by the Chief Officer (Place) (1) providing
an update on the progress in implementing the Shared
Prosperity Fund; and (2) detailing the range of activities
and outcomes that the UKSPF has supported over the
last three years. 
133 - 148
Page 3 of 174

Page 4

7  Accounts Commission Briefing – Local
Government Budgets 2025-26
Submit report by the Chief Officer (Finance and
Technology) (1) detailing the Scottish Government
funding for local government in 2025/26; and (2)
highlighting the recurring financial pressures faced by
Councils. 
149 - 154 
8 5 Year Medium Term Financial Plan 2026-27 to
2030-31
Submit report by the Chief Officer (Finance and
Technology) (1) seeking approval of the updated five-
year medium term financial forecast up to 2030/31; and
(2) outlining the challenges faced by the Council in
maintaining medium term financial stability, whilst
achieving the strategic priorities of the Council. 
155 - 174 
Page 4 of 174

Page 5

Annual Communications Review and Evaluation
North Lanarkshire Council
Report 
Does this report require to be approved? ☐ Yes  ☒ No
Ref CC/SP Date 05/06/25 
From Stephen Penman, Chief Officer (Strategy and Engagement)
E-mail PenmanSte@northlan.gov.uk Telephone 07947 997750 
Executive Summary
Following approval of the Communications and Engagement Strategy by the Policy and
Strategy Committee in May 2024, a full programme of communications activities,
campaigns and projects has been undertaken over the last year to support the ambitions
outlined in The Plan for North Lanarkshire and the deliverables aligned with the new five-
year Programme of Work.
As outlined in the ‘measuring success’ element of the agreed strategy, all major
communications and engagement activity is reviewed and evaluated to ensure alignment
with The Plan for North Lanarkshire and the Programme of Work and to demonstrate
effectiveness, positive outcomes and impacts.
The associated review and evaluation is appended to this report. 
Recommendations
It is recommended that the Policy and Strategy Committee:
(1) Acknowledges the significant communications work undertaken during 2024/25. 
(2) Otherwise notes the contents of the report. 
The Plan for North Lanarkshire
Priority All priorities
Ambition statement All ambition statements
Programme of Work All Programmes of Work
Policy and Strategy Committee
Item 2
Page 5 of 174

Page 6

1. Background 
1.1 The Policy and Strategy Committee approved a five-year Communication and
Engagement Strategy in May 2024. As part of the implementation of the strategy, the
Chief Officer (Strategy and Engagement) is required to present an annual
communications evaluation to the committee for approval.
1.2 Annual review and evaluation reports for communications activity have demonstrated
the value, benefits and effectiveness of good, multi-disciplinary communications since
the inception of The Plan for North Lanarkshire.
1.3 As outlined in the Communication and Engagement Strategy, an annual review and
evaluation of communications activity is crucial to demonstrate effectiveness and
performance of the service. The evaluation report links the outputs and outcomes
generated by Corporate Communications to improved service delivery and positive
impacts for residents, communities and businesses. All activity is aligned to key themes
in The Plan for North Lanarkshire and the Programme of Work, as well as regular
council business. 
2. Report
2.1 It should be noted that the annual plan evaluation does not contain all communications
activity over 2024-25. It summarises significant communications activity relevant to The
Plan for North Lanarkshire and the Programme of Work, as well as other campaigns
and communications activity with a clear focus on outputs and positive outcomes for
people, communities and businesses.
2.2 The evaluation incorporates an overview of the communications activity in 2024-25,
key annual highlights and narrative around how communications has supported
services, council policies and the current programme of work and how they align with
The Plan for North Lanarkshire. This review also incorporates an overview of the
operating model for communications going forward. 
2.3 In line with the overarching communications strategy, all major activity must support
either a Programme of Work, or an ambition statement, which aligns with the core
narrative supporting the Live, Learn, Work, Invest and Visit brand strategy.
2.4 Much of the focus for communications activity over the last year has been on
supporting specific projects within the seven Programmes of Work, as well as ongoing
campaigns aligned to The Plan for North Lanarkshire. It should be noted that
communications support for committee business, civic activities and functional services
are standard operations and may not be included in the evaluation. 
2.5 Several key issues that required significant communications support are highlighted in
the report, specifically Storm Eowyn, the first red weather warning in Central Scotland
in over a decade, the impact of Reinforced Autoclaved Aerated Concrete on a range of
services and management of communications around the UK General Election.
2.6 All campaigns that have been evaluated will be shared and discussed with services
across the council to ensure they inform service changes or improvements. Evaluations
will inform future campaigns and phases of campaigns to ensure a robust
demonstration of the outcomes which can be achieved by excellent communication
activity. Key achievements include:
Page 6 of 174

Page 7

• The promotion of the refurbished library at Motherwell contributed to an increase in
visitor numbers by almost 11% in 2024/25.
• Open Market Purchase Scheme campaign saw a 569 increase in click-throughs to
the dedicated webpage which generated a 57% increase in applications, resulting in
83 properties purchased.
• A specially designed exhibition to promote the future of Cumbernauld Town Centre
realised 439 individual engagements with officers, 263 survey responses and 1,667
hits to the webpage.
• The multi-channel Sum it Up numeracy campaign generated impressive results with
more than 450 individuals supported to date, 360 learners registered for Scottish
Qualifications and 283 achieving SQA qualifications.
• After creating a compelling brand and look to The Hive women’s business
incubator, the dynamic campaign drove 444 online registrations, 1,424 hours of
workspace bookings over the year and importantly, helped create 31 new female-
led businesses.
• The modern apprentice campaign saw a rise of 672% in applications compared to
the previous year.
• Work to promote the NL Employer Charter generated 7.7 million impressions,
resulting in 49,000 click-throughs to the webpage, video adverts fully viewed 53,000
times and we now have 62 employers registered to become accredited charter
members.
• As a result of activity to promote the Working For Families programme, 680 parents
have now registered, with 206 securing employment, 152 gaining work placements
and 228 attaining qualifications.
• The range of campaign work to support people struggling with the cost of living,
included supporting Challenge Poverty Week, which saw the tackling poverty team
assisting 1,992 individuals, addressing over £6.4 million of debt (an annual increase
of 14%), as well as requests for benefit checks rising by over 41% and welfare
rights referrals increased by 25%, generating nearly £48 million in additional benefit
income for North Lanarkshire residents.
• The campaign to promote North Lanarkshire as an attractive base for business saw
the videos attract 4.4 million impressions, 28,000 clicks-throughs to the Invest in
North Lanarkshire website, generating 54 enquiries from interested businesses.
• The period products campaign webpage has been visited 20,000 times and the
animation has been viewed 105,000 times. When polled (2025), 91% of women
said they were aware of the service and 82% said they had seen the service
advertised, which is testament to the power of the campaign’s reach.
• A campaign to address under-reporting of domestic abuse from women over 50
reached 53,000 women, gaining 441k impressions on Facebook/Instagram and 667
link clicks to the adult protection webpage outlining support services available to
them. Aura reported an uptick in women contacting them, with 50 looking for
support.
• The innovative North Lanarkshire Stories Trail created and produced by the team
across 10 locations has seen 20,000 visits to the webpage in the six months since
launch and almost 1,000 interactions with the QR codes at locations.
• The campaign to promote the annual pantomime at a new venue saw ticket sales
rise by 34%, the promotion of Easter sports camps saw sales rise by 14% and
compelling campaigns promoting leisure saw gym memberships grow overall by
16.5%, from 30,048 in 2024 to 35,021 in 2025.
• The promotion and creation of two themed fanzone events at Broadwood Stadium
on the back of Scotland’s national football team reaching the UEFA European
Championships, saw both 5,000-capacity events sold out. 
2.7 There is a continued focus on linking internal communication activity with the council’s
overall strategy, ensuring staff can be ambassadors for the council’s work and feel
informed about major priorities. This was central to the organisation of a series of
Page 7 of 174

Page 8

roadshow events to promote the ambition and delivery of The Plan for North
Lanarkshire and the Programme of Work. A total of 75 events took place across 42
different venues with 2,630 attendees, and feedback demonstrating that the roadshow
was relevant, informative and dynamic. 
2.8 The challenges facing communications from the emergence and increased use of AI,
automation, changing communication technology and algorithms and an increasingly
fragmented social media landscape are acknowledged in the report, with a commitment
to shaping and embracing them into the operating model for Corporate
Communications over the next few years. 
3. Measures of success
3.1 Measures of success are evidenced through communications outputs and outcomes
aligned to projects and activity within The Plan for North Lanarkshire and the
Programme of Work as outlined in the appended report. 
4. Supporting documentation
4.1 Appendix One: Communications Plan Evaluation 
Stephen Penman
Chief Officer, (Strategy and Engagement) 
Page 8 of 174

Page 9

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts been discussed and agreed with
Finance?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal
data?
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk
Yes ☐ No ☐
5.6   Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes   ☐ No ☒
If Yes, please provide a brief summary of the impact?
Page 9 of 174

Page 10

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)?
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? Provides an overview of the
positive impact on communities, people and businesses in North Lanarkshire
through communications activity.
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)?
Yes ☐ No ☒
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out?
Yes ☐ No ☐
Page 10 of 174

Page 11

Appendix 1 
communications plan evaluation 2024 - 2025 
Page 11 of 174

Page 12

This is the annual review and evaluation of
communications and engagement for North
Lanarkshire Council 2024-25.
The evaluation incorporates an overview of the communications activity last year
(2024-25), key annual highlights and narrative around how communications has
supported services, council policies and the current programme of work.
As a communications service, we continue to navigate a changing media and digital landscape, which brings challenges around
misinformation, AI, citizen journalism and an ever-evolving relationship between algorithms, data and analytics. Ensuring that council
content is authentic, informative and engaging, is crucial to maintaining genuine relationships with communities, partners and staff,
together with the council’s communications ethos to be open and transparent.
In terms of communities, more targeted engagement using local news has proved to be effective, as well as encouraging communities
to advocate good news and activity from the council and its partners locally. The role of communities is changing, with more demands
from individuals and families on council services. Much of our campaign messaging inspires individuals to take proactive steps to
improve their lives and continued communications should assist in developing relationships with communities by delivering meaningful,
relevant and credible information for residents and businesses.
The importance of quality content has never been more important to foster community engagement and using storytelling to explain
what The Plan for North Lanarkshire and the consequent benefits are for people, communities and business.
Substantial projects and programmes are underway across North Lanarkshire which are already seeing transformational change to
town centres, improved infrastructure and continued investment in business and people; generating increased productivity, pay and
jobs. Many of these activities are focused on the most vulnerable people in communities, providing more opportunities for employability,
training or other support.
In addition, major events that took place last year required significant support from communications, including the UK-wide issue
of Reinforced Autoclaved Aerated Concrete (RAAC), the UK general election, Storm Eowyn and the three-month Plan for North
Lanarkshire staff roadshow.
Our work this year centres around three core areas: key highlights, The Plan for North Lanarkshire and its associated Programme of
Work (communications support for specific programmes are highlighted throughout this document) and key projects that support how
North Lanarkshire is the place to live, learn, work, invest and visit. 
Stephen Penman
Chief Officer (Strategy and Engagement)
May 2025
Page 12 of 174

Page 13

This is North Lanarkshire.
The story 
The place to Live, Learn, Work, Invest, and Visit. 
It’s a place where residents, communities and businesses have been
affected by the coronavirus pandemic but one that can and will recover.
It’s our vision, our shared ambition. It’s what We Aspire to achieve.
Our ambitious plans are already underway for social and economic
regeneration and growth that benefits everyone in North Lanarkshire. We are
already responding to major social, economic and technological change.
We are improving the lives of everyone who lives, learn, works, invests
or visits here by driving inclusive economic growth, increasing skills and
generating jobs and training opportunities. In doing this, we will reduce
poverty and inequality.
We work in partnership to achieve this and we involve people in
communities in what we do. We share our ambitions with them.
We have big ideas and the vision to achieve them. Page 13 of 174

Page 14

communications plan evaluation 2024 - 2025 
LIVE HERE LEARN HERE WORK HERE INVEST HERE VISIT HERE 
4
North Lanarkshire is the
place to visit and play. Our
tourism sector is growing
with improved opportunities
and better attractions and
events.
We offer distinctive,
authentic experiences which
provide value for money
and are accessible to all.
Investment is generated
by achieving the right mix
of events hosted here,
bringing additional money
into the local economy
and supporting jobs and
business. We are building
on our reputation for hosting
world class events.
This is a place for active,
healthy lives. A place where
the right facilities are in the
places they’re needed. A
place to enjoy.
North Lanarkshire is the
best location for business.
There are excellent
transport links across
Scotland and the UK, a
strong employment market,
a skilled workforce and
flexible land and premises.
There is an effective digital
infrastructure.
Businesses have the
support to grow and
succeed, to develop new
products and markets and
to create and secure new
jobs.
Existing businesses have the
help they need and North
Lanarkshire is attractive to
new employers. Residents
have job opportunities and
our economy will continue
to grow in a way that
benefits all local people.
We have a dynamic, diverse
and growing economy
with a great mix of small,
medium-sized and large
businesses.
People in North Lanarkshire
are connected to
employment and have the
support they need to access
jobs. They have skills
appropriate to the needs
of employers. They are
supported, no matter their
background, personal needs
or economic circumstances.
We provide great places
to work, with engaged,
ambitious people who
are ambassadors for the
services they provide.
All young people in North
Lanarkshire can achieve
their full potential. They
have the tools to make their
way in life through quality,
exciting, and challenging
learning. That means
improving attainment and
closing the poverty-related
attainment gap.
Learners of all ages have
the skills to take advantage
of the employment
opportunities our growing
economy brings. We have a
flexible, resilient and skilled
workforce for the future.
Everyone has access
to quality learning and
teaching. We make sure
our schools are inclusive,
energetic places which take
into account the needs of
all our young people. Young
people have experiences
which last a lifetime and a
voice in their own learning.
North Lanarkshire has
welcoming, vibrant towns.
Places where people want
to live.
We have a history, but a
much bigger future.
We have a great mix of
housing, facilities and
services. We’re transforming
our town centres. We’re
helping people live for longer
in their own homes. We’re
improving transport links.
These are happy,
connected, safe and resilient
communities.
Page 14 of 174

Page 15

Corporate Communications
Production Overview
2024/25
Page 15 of 174

Page 16

Strategic Communication
communications plan 2024 - 2025
Corporate Communications sits within the wider Strategy and Engagement service, providing
enhanced opportunities to engage with the public through interdependent services: the
community partnership team, customer service hub and leadership and operating model. With
strategy and customer experience joining in 2025/26, strengthened engagement with residents
and businesses can be explored. 
The range of communications activities is far-reaching and diverse and
requires insight, coordination and direction in order to deliver a quality
service. Much of this work is planned, some is reactive.
But our approach is always professional, structured and embedded in
strategic thinking. Some highlights of the year are outlined below. 
Storm Eowyn
A rare red weather warning in January 2025 saw
schools, workplaces, transport and shops close as
Storm Éowyn wreaked havoc on North Lanarkshire
due to winds up to 100mph. The Met Office warning
claimed there could be a risk to life due to flying
debris, fallen trees and damage to buildings.
Following the initial Corporate Resilience
Management Team/gold command meeting,
decisions were made about services, including
meeting closures of schools, leisure facilities and
other impacts such as domestic bin collections.
The council has well-developed plans for severe
weather and the team worked closely with its
communications partners through local, regional and
national resilience arrangements.
Corporate Communications immediately stepped
up, pulling together a crisis response team, creating
a dedicated webpage on the council website with
Page 16 of 174

Page 17

es and impacts on residents 
and businesses, such as road closures. The
webpage was the central source of the most up to
date information and provided clarity, reassurance
and authenticity, with over 3,000 hits and almost
2,000 unique users visiting the page.
We also created a partner checklist, where we
identified helpful information from partners including
Police Scotland, Transport Scotland, Scottish
Government and Scottish Fire and Rescue, that
could be beneficial to residents and staff on the day
of the storm. The team checked for key issues such
as power, fallen trees, road closures and flood alerts,
and shared anything appropriate on our social media
channels and web page.
The team worked over the four days of the storm,
liaising with contacts at key services to get the latest
information to promote service updates. There were
over 500 incidents reported on fallen trees and
messaging was devised to reduce multiple reports
Page 17 of 174

Page 18

communications plan evaluation 2024 - 2025
7  
Reinforced
Autoclaved
Aerated Concrete
(RAAC) 
The UK-wide issue of RAAC unfolded at the tail end of
2023 with the material being identified in the majority
of the roof at the Motherwell Concert Hall and Theatre
following a review of the corporate estate. The immediacy
of the issue was highlighted due to some of the RAAC
panels being damaged by water ingress, resulting in the
immediate closure of the venue for safety reasons. This
required a series of communications to alert current and
future ticket holders of the change of venue for many of
the performances to Airdrie Town Hall, with the showcase
performance of the annual Christmas pantomime moved
to Ravenscraig Regional Sports Facility for the second
time.
To be as open and transparent as possible, a dedicated
webpage was set up with information on what facilities
have been affected and what the council is doing to
address any issues. This page is constantly updated with
the latest information and received almost 2,000 page
views over the year.
Ongoing assessments are being carried out on council
housing, with communications underway to the very
small number of residents affected. This remains an
ongoing communications activity for the team to ensure
that the council is doing everything it can to make
buildings, facilities and homes as safe as possible. 
and to manage resident expectations on clear-
Page 18 of 174

Page 19

communications plan evaluation 2024 - 2025
8  
UK General
Election
Corporate Communications has an important role to play
in the running of elections, both national and local.
We provided communications support for the UK General
Election in July 2024, which included specific pre-election
guidance for officers and other staff to ensure they were
aware of restrictions throughout this period. Ahead of the
General Election in July, the key message was the need
for residents to have appropriate voter ID; the first time
this was needed for an election in Scotland.
Information was posted regularly on social media, using
information from the Electoral Commission, highlighting
different types of ID and how to apply for alternative free
ID. The message was also included in news releases,
GovDelivery emails, staff newsletter and on the web
site as part of the overall communications plan for the
election.
We carried out promotional activity to encourage
residents to register to vote and for a postal vote, as well
as encouraging residents to go to the polls to cast their
vote.
Given the timing of the elections, during the summer
school holidays in Scotland, issues began to arise
around the postal vote. A small number of the 45,000
postal voters in the area had not received their postal
voting pack and we were able to quickly identify and
communicate arrangements to provide a replacement for
affected voters.
We worked with national broadcast media to ensure
coverage of the election count was delivered effectively,
and immediate updates following the announcements of 
new MPs were communicated on a wide range of media
channels.
The General Election resulted in by-elections in two
council wards in October. We supported the election
team again to provide residents with the information they
need to use their vote.
Page 19 of 174

Page 20

communications plan evaluation 2024 - 2025
9  
Budget Engagement 2024/25
Although meaningful and effective consultation on local
authority budgets is difficult to achieve for a range of
reasons, including the complexity and extent of services,
unconscious bias on the part of participants and the
consequent difficulties stemming from asking people
to value one service over another. Following on from an
exceptional response rate to our quantitative survey in
23/24, our team procured a research agency to build
on this insight. For a qualitative perspective, the agency
created a series of focus groups and in-depth interviews
to provide resident insight on their understanding of
council services and finances.
There were three elements to this work: a desk review
of previous budget research and budget decisions
carried out by the council, five community days (where
independent, external researchers engaged directly with
residents within communities) and group discussion
sessions. The fieldwork was carried out in November and
December 2024. The total sample was 101 respondents,
which is considered an excellent qualitative sample for
this work and included residents from all nine community
board areas.
The research demonstrated that people find it difficult
to discuss council finances, particularly the detail for
each service. However, overwhelmingly, respondents
were keen to see services preserved without further
cuts, and investment in the future of services and in the
regeneration of North Lanarkshire, along with strong
leadership which will fight to protect services. There
was a desire that the council should make efficiencies,
change the way it delivers services, and innovate before
cutting services.
People thought it important that the council
had demonstrable values around ensuring
that the most vulnerable people were not
disproportionately impacted by any cuts.
Consultation and engagement on budgets
is notoriously difficult for local government,
and this qualitative research only strengthens
that perception. A report was provided to
elected members to assist with making
budget decisions that included the findings
of the qualitative research, as well as
the quantitative research carried out the
previous year, which still has relevance.
2025-2026
Page 20 of 174

Page 21

10 
communications plan evaluation 2024 - 2025 
Campaigns and Media
Our media team dealt with 320 enquiries, provided 43 statements and issued 300 news
releases over 2024-25, produced and posted 131 videos to support proactive stories, tweeted
795 times, compiled 798 Facebook posts, 278 on Linkedin, 69 photographs on Instagram
and 71 videos on TikTok, generating a wealth of coverage in traditional and digital media. 
Preparing media responses and advice for residents
in relation to news items or incidents, including Storm
Eowyn, council tax and budget or incidents and
issues stemming from external and internal political,
economic and social events, are core activities. Media
interest can exacerbate issues, and social media can
fuel misinformation and incongruous sentiment among
communities. It is important that communications are
timely, open and valid, in order to clarify facts for people
or to provide reassurance of action being taken.
Important advice was issued to residents and businesses
following a chemical spillage in Coatbridge and
reassurance messaging was provided to the community
following unfounded concerns at The Time Capsule.
A global IT outage linked to an external provider that
affected organisations around the world impacted on
some card payments for council services including leisure
centres. The team quickly issued information on social
media, as well as to staff operating the payment systems.
The team also liaised closely with NHS Lanarkshire public
health over a very small public health outbreak in a town,
providing communications support, letters for parents
and promotion of vaccination clinics.
Continued pressure from parent/carer groups regarding
the changes to school transportation limits, led to
significant media enquiries. A later change in policy was
agreed by the council to remove the previously agreed
changes limits in the coming year for primary-aged pupils
only and this was welcomed by parents and carers
across the region.
Page 21 of 174

Page 22

11 
Page 22 of 174

Page 23

12 
communications plan evaluation 2024 - 2025 
Read all about it
In January 2024 we worked with the libraries team to
promote the opening of the newly-refurbished Motherwell
Library. Key to this was launching an appeal to find the
family of a Scottish woman who left more than £350,000
to two Lanarkshire libraries - decades after she emigrated
to the US.
This story gained national attention with both STV and
BBC news covering the story as well as national and
local newspapers and radio.
The refurbished library is proving popular with local
people with visitor numbers up almost 11% in 2024/25,
compared with the previous year and the number of
items borrowed up 14.5% over the same period. 
star Reece Clarke, returned to perform in his
hometown in August.   
fellow Royal Ballet dancers.
The media team worked closely with colleagues
from Active and Creative Communities as well as
of his presentation to pupils at Airdrie Academy
including BBC Reporting Scotland and STV. 
local talent to international ballet sensation, with
proceeds supporting The Guide Dogs charity.
Page 23 of 174

Page 24

TRANSFORMING PLACES 
Housing
Our new council house building programme forms part of
the council’s overall vision to transform communities and
town centres as places where people want to live. This
year, the target to deliver new homes by 2035 increased
to 6,000, with a total of 2,393 delivered to date and 278
this year alone.
We promoted key milestones including new sites, builds
in progress and completed developments, together with
showcasing the quality of our homes, their eco-friendly
features, and tenants’ stories.
We issued newsletters via email to 10,361 residents
facilitated interviews for local and national media to
highlight significant milestones including tenants’
testimonials and explained how the council is
transforming derelict properties in town centres into
quality homes, inciting local pride. Video undoubtedly
generated an increase in likes and shares online while
raising awareness of our investment, ambition and life
changing new homes.
We used local channels to promote completion of
various energy efficiency and renewable technology
projects across the area, focussing on happy tenants and
outlining the improvements, investment and benefits.
These include the installation of EV charging pillars to
support the move to electric vehicles, the availability of
cycle parking and more recently supporting a Ministerial
Visit, to a development at Brandon Street, Motherwell, to
showcase a ground source heat pump system.
A dedicated campaign to promote the Open Market
Purchase Scheme, which aims to tackle homelessness,
increase the supply of affordable housing and bring
back long-term empty properties back into use was
successful. Consistent messaging and targeted
promotion highlighted the benefits of the scheme for
local communities, private sellers and landlords. Our
campaign saw an 837% increase in page views, 10426
impressions from Google search ads with an impressive
CTR of 13.25% and importantly, a massive 569% jump
in click-throughs to the dedicated webpage to 897 last
year. This generated a 57% increase in applications
which saw 83 properties purchased (of which 34 were
long-term empty homes), contributing to 836 homes
secured since the scheme’s launch in 2013.
Page 24 of 174

Page 25

communications plan evaluation 2024 - 2025
13 
CityDeal
2024 saw the 10th anniversary
of Glasgow City Region City
Deal which we marked with
communications highlighting
the progress to date and the
benefits to the economy and local
communities.
From November to January a community engagement
exercise was run on the updated design for the East
Airdrie Link Road. Corporate communications supported
this through a news release, GovDelivery email, web
information and social media messaging throughout the
exercise.
The council received 77 responses to the engagement
exercise, and feedback is being used to help refine
the detailed route of the road ahead of the planning
application being submitted. 
Cumbernauld Town Centre
We developed and produced an exhibition 
webpage. Council officers were on hand to discuss 
of the town removed. A few areas of concern were 
webpage. 
featured a QR code which took users through the
was happening in the town centre. 
Community Hubs 
School and the St Stephen’s Community Hub.
Our media team has worked with the estate 
the opening we created three videos which were
seen by thousands of people. 
Muirhead Clinic.
Page 25 of 174

Page 26

communications plan evaluation 2024 - 2025
14 
DIGITAL NL 
We continue to encourage residents and businesses to
access council services online through our ongoing ‘It’s
Quicker to Click’ campaign. To migrate online, customers
have to sign up to a MyAccount and by the end of March
2025, we have 159, 862 people registered, which means
that all households in North Lanarkshire should have
an account, with 5,125 average weekly users.This is a
17% rise on the figure for March 2024 and represents
57% of the adult population aged 16 and above in North
Lanarkshire.
As more council services are available online, we are
highlighting how residents can access the services. A
further 16 services came online in the last year, which we
promoted to communities.
Analysis of web visit data shows highlights from just
some of the online services (using forms) completed from
1 April 2024 to 31 March 2025, demonstrating increased
use.
Promotion of the Driving Digital Locally intergenerational
programme is showing how the council is supporting
older residents to learn about digital technology. Details
of successful projects were shared on our local channels
and in relevant media, recognising the achievements of
the 115 pupils and 90 residents who took part over eight
sessions. Another project offering digital skills to people
in Holytown saw 11 residents completing a course solely
on the back of promoting locally. 
SUSTAINABLE FUTURES 
Through the Centre of Excellence for Decarbonising
Roads (CEDR), the council carried out the first trials of
new materials designed to reduce carbon in the roads
industry.
A range of innovative materials were applied during
the trials, including a surface rejuvenator which aims to
extend the life of the road, products to repair potholes
and road marking materials.
Regular inspections of the trial sites are ongoing to
monitor the condition and performance of each product
over time.
In partnership with the CEDR partners, corporate
communications delivered a communications plan to
share learning and outcomes from the project with
other local authorities, academic institutions, and private
companies within the road industry.
Webpage or form Page views
(of which are unique)
Recycling book in 20181
Request a housing repair 16112
Request a special uplift 9217
Free school meals and
clothing grants 7802
Report a household
waste issue 6967
Request a new recycling
bin 3561
Report anti-social
behaviour 2835
Report a roads and
pavements problem 2827
Complaint 2413
Fly-tipping report a
problem 2324
Report an abandoned
vehicle 2264
Request a new bin 1367
Request street cleaning 1340
Report a problem with a
tree 1235
Report a problem with
streetlighting 1340
Request pest control 1074
Request to join bin
pullout service 956 
Page 26 of 174

Page 27

communications plan evaluation 2024 - 2025
15 
Page 27 of 174

Page 28

communications plan evaluation 2024 - 2025
16 
BRIGHTER FUTURES 
Sum it Up 
Recycling
New shared waste facilities for flats are delivering a
significant improvement in recycling levels.
As a result of contamination, the previous bins regularly
saw 70% of materials rejected – with the new bins,
more than 98% is recycled. To support installation of the
new facilities at 80 locations, a comprehensive pack of
information was created and provided to tenants to help
them use the bins effectively.
A new grant scheme offering small to medium sized
businesses help to reduce their environmental impact
and improve the sustainability was launched in April
2024. We promoted the Net Zero Business Challenge
Fund through local media and our channels aimed at
the business sector, and as a result, our enterprise team
received 30 applications.
2024 marked the 10th anniversary of Get Walking
Lanarkshire, a partnership between North and South
Lanarkshire Councils, NHS Lanarkshire and Paths for All
which organises 33 free weekly walks.
We promoted a series of four special walks held in May
to celebrate the anniversary and followed up with social
media posts thanking everyone who took part and using
photos from the walks.
In October, we followed up with a news release and
four-week social media campaign highlighting different
benefits of the health walks, with photos and quotes from
participants.
The social media posts were well received, with
high engagement rates and the campaign resulted
in a number of new walkers joining the health walks
programme.
We used a multi-channel campaign to promote our
adult numeracy programme designed to enhance
confidence with numbers and increase employability
prospects. This included the creation of 12 videos
featuring real participants describing their experiences
and achievements which were promoted on Google,
Snapchat, YouTube, Spotify and 60 online radio stations.
Print materials and outdoor adverts were strategically
placed in high-footfall areas such as supermarkets,
schools, GP surgeries and individual classes were
promoted on the Adult Learning Facebook page.
• Adverts and videos generated over 13.2 million
impressions and 95.7k clicks in total
• As a result of campaign activities, the webpage was
visited 85K times by 66K users
• The Adult Learning Facebook page grew from 720 to
1,030 followers within two months
• Registrations for some classes increased from zero to
full capacity following social media posts
This campaign generated impressive results with over
450 individuals supported to date.
• 360 learners registered for Scottish Qualifications
Authority (SQA) courses Page 28 of 174

Page 29

communications plan evaluation 2024 - 2025
17 
• 283 SQA qualifications achieved, with 52 learners
earning multiple qualifications
• 95% of participants reported improved numeracy skill
• 98% expressed high satisfaction with their learning
experience
• 77% reported improvements in their personal life and
mental/physical health.
In addition, the multi-media team created a website for
the west partnership, comprising eight local authorities,
to promote numeracy courses across the region. This
included designing and creating the website and content,
including videos and sound. Called Multiply123, the
website saw over 53,000 visits over the year, 38,400
unique users, 247 enquiry forms submitted and 240
people providing feedback that they found out about the
campaign through advertising. 
The Hive
Only 2.2% of working-age women in North Lanarkshire
are self-employed. As a way of addressing inequalities
in entrepreneurship, the team was heavily involved in the
design and development of The Hive, which launched
in February 2024. A visible space to house and support
female-founded business start-ups to increase business
participation and economic performance.
Offering desks, offices, meeting rooms, treatment rooms,
onsite business support and networking opportunities,
we are the first local authority in Scotland to offer a
dedicated female-led business workspace.
Creating a compelling brand and look for the facility, as
well as campaign collateral, we devised a campaign
targeting women over 18, to drive them to register with
The Hive, included the creation of bespoke, branded
signage and fixtures and fittings within the facility itself,
printed collateral (flyers, pull-up banners, posters), a
webpage, new Facebook page, audio adverts across 60
online radio stations, and videos promoted on Google
and YouTube.
The Hive Facebook page following grew from zero to
over 1k followers, online adverts and FB posts gained a 
THE HIVE 
total of 3.2 million impressions, with
33.3k click-throughs to the Hive
webpage. A series of testimonial
videos featuring Hive users were
viewed 91k times. This activity
helped drive 444 online registrations with The Hive, 1,424
hours of workspace bookings over the year and 298
women attending events. Importantly, 31 new female-led
businesses have been created thanks to support from
The Hive.
Page 29 of 174

Page 30

communications plan evaluation 2024 - 2025
18 
Volunteers
Throughout 2023/24 and 24/25 we posted on
facebook, X and Linkedin to highlight volunteering
opportunities available to both individual people and
to employers. These posts helped grow the number
of people involved in volunteering projects in our
area with 164 volunteering opportunities created
and 62 organisations receiving grants to assist with
volunteering, making a difference to communities in
North Lanarkshire. 
Pathways to Work
To support the recruitment of Modern Apprentices
into council roles, 10 positions were promoted
through Facebook and LinkedIn in May 2024 using
videos and images of past and present apprentices
describing their experiences and achievements.
The series of posts received a combination of
2.3k reactions, comments or shares and 19k post
clicks, which resulted in 170 applications. Prior to
our activity, only 22 applications had been received.
Scottish Apprenticeship week was also promoted
in March to raise awareness of apprenticeships to young people and their families
through a series of posts celebrating our Apprentices, on Facebook and LinkedIn,
which resulted in 2.1k reactions, comments or shares and 9k clicks. 
The 2024 Student Summer Placement Programme was a resounding success,
supporting 128 young people aged 16–18 from local high schools, priority groups, and
New College Lanarkshire in paid six-week placements across key sectors including
construction, health & social care, early years, sport, and administration. A strong
communications strategy, working in partnership with our Early Careers Team, played
a central role in achieving this success. A wide range of channels was used, including
news releases, engaging student and mentor videos, regular social media posts,
internal communications, and direct promotion through schools and colleges. These
efforts helped raise awareness, encourage applications, and celebrate achievements,
including a high-profile celebration event attended by over 300 people. Key
achievements include a 97% completion rate, 43 students offered casual contracts, 
and several securing apprenticeships or permanent employment. The programme also
provided skills workshops, Green CSCS Cards for construction students, and real-
world experience that has equipped participants with transferable skills and boosted
their future prospects.
We are already preparing for our 2025 intake with key figures including:
• 1492 applications (250 last year) – a huge boost in applications
• 485 students invited to interview
• Approximately 192 placements
• Increase in Built Environment external placements from 21 in 2024 to 40 this
year
Page 30 of 174

Page 31

communications plan evaluation 2024 - 2025
19 
NL Employer Charter
We work with the employability services team to
promote the NL Employer Charter to businesses
across North Lanarkshire to maintain and support
a network of good employers who do business
responsibly, to a set of prescribed standards.
With the aim of increasing membership, a campaign
to promote the charter to all businesses in started
in September 2024 through news articles, email
marketing and social media posts. A series of
adverts and videos were produced, using current
charter member testimonials and promoted online on
appropriate business-to-business channels: LinkedIn,
Google and YouTube, through direct marketing with
emails/hard-copy leaflets sent to 11,429 senior
decision makers and supporting a presence at local
business events.
The adverts generated 7.7 million impressions,
resulting in 49k click-throughs to the webpage. The
video adverts were fully viewed 53,000 times.
We now have 62 employers who have registered to
become accredited charter members.
Working for Families
We worked with the service to devise a look and 
and 69k click-throughs to the new website and
Page 31 of 174

Page 32

communications plan evaluation 2024 - 2025
20 
Tackling Poverty
Poverty and in particular, child poverty, continues to
have a detrimental effect on famlies. We provided
ongoing communications support throughout the year
across a range of PR, digital, social media, website
and campaign activities, including articles in the
Tenants’ News to the integrated multi-service teams
that can assist. 
We supported Challenge Poverty Week (7 to 13
October 2024) to help raise awareness of support
and solutions to poverty available. Throughout
the week, we shared information aligned with the
daily themes to promote the wide range of advice
and support available for families facing income or
money challenges. This included promotion of local
community events, and the launch of a Pension Credit
campaign aimed at encouraging applications and
entitlement to the Winter Fuel Payment.
• Challenge Poverty Week results: received 116,747
(6688 local channels) impressions, 361 reactions
(10 local), 185 shares (13 local), 240 link clicks (19
local) and 993 engagements (53 local). A series of
13 animations created (also produced in BSL) and
launched to support the campaign.
• During 24/25, debt advice services provided by our
Tackling Poverty team assisted 1,992 individuals,
addressing over £6.4 million of debt, an annual
increase of 14%
• Requests for benefit checks rose by over 41% and
welfare rights referrals increased by 25%, generating
nearly £48 million in additional benefit income for North
Lanarkshire residents.
• Housing Income Maximisers (trained to support tenants
at every stage of their tenancy) generated a total
income of £20,068,915.83 for tenants during 2024/25.
The Rapid Re-Housing Transition Plan (RRTP) helps
to address homelessness and we signpost people
to support and help such as the Household Support
Fund, which has assisted 140 young, single individuals
facing financial hardships with essentials like rent,
energy, and food costs, preventing further cases of
homelessness.
The team works closely with
the community partnership
team to engage with
communities by highlighting
the successful delivery of
local development plan
projects using video to
showcase community use of new facilities. As a way
of influencing participation, particularly around the
community asset transfers programme, we promoted
local achievements to demonstrate successful
community ownership of assets. A video made with
grassroots sports club, Fir Park Corner was well
received online, after it was granted ownership of
Overtown Sports Pitch and Pavilion and was viewed
14,626 times and received 252 comments and
reactions. The agreement has enabled the football
club to establish the pitch and pavilion as a central
hub for their teams, which currently include an
amateur team, an over-35s team, and four children’s
teams.
Breastfeeding Friendly 
by a win at the
COSLA awards
for the initiative
in the Tackling
Inequalities and 
and Wellbeing
category. We 
to promote 
support. 
Breastfeeding Friendly Scotland week local 
post on Facebook received 498 engagements,
North Lanarkshire has had one of the lowest
Page 32 of 174

Page 33

communications plan evaluation 2024 - 2025
21 
INVEST IN NORTH LANARKSHIRE 
To promote North
Lanarkshire as an attractive
base for business to set-
up, relocate or expand,
a series of eight videos
featuring local companies
who have either located
to or expanded in the
region were produced and shared using online channels LinkedIn and YouTube -
targeting senior decision makers across the UK. News copy was promoted when
new businesses located to the area, to highlight their experiences and the benefits
to other potential organisations. There was also a feature in Commercial Property
Magazine to further raise the profile of North Lanarkshire as THE place for business.
The videos have achieved 4.4 million impressions and 28k clicks-throughs to the
Invest website. This represents an average click-through rate of 0.63%, which
is higher than the industry average of 0.43%. This generated 54 enquiries from
interested businesses through the website during the campaign period. 
As part of the One Service programme of work, The Plan for North Lanarkshire
roadshow was planned, developed and delivered to coincide with the new five-year
Programme of Work.
We organised a series of engagement events from April to September 2024 for
staff, stakeholders and elected members as a platform to outline The Plan for North
Lanarkshire and the associated Programme of Work. Entirely organised by a core
team, a total of 75 events took place across 42 different venues to provide a wide
geographical spread and opportunity for staff to attend. In addition, dedicated
sessions were arranged for community boards and community groups, elected
members and local industry through a business breakfast, which generated a
number of leads for the enterprise team.
Designed in two parts: a dynamic multi-media presentation on The Plan for North
Lanarkshire and the Programme of Work by a chief officer, and an engagement
session, where staff could feedback and input their thoughts.
The team’s promotional work generated
3314 bookings made on an online booking
system, resulting in 2630 attendees,
representing an attendance rate of 79.3%,
higher than average for conference
attendance figures.
This represents almost one in five members
of staff attended a session. Overall, more
than two thirds of staff thought that North
Lanarkshire as a region was getting better
and 79.9% of respondents said that they
thought the Programme of Work was
getting it right in terms of achieving the right
outcomes.
Almost all attendees thought the sessions
were valuable with many saying the
presentation was informative, dynamic and
visually stimulating. Having the opportunity
to ask questions and find out more
information about the programme of work
was productive and helped them have a
better understanding of the ‘bigger picture’
on what the council was aiming to deliver
with its partners.
There is an appetite for more engagement
sessions with an update on progress, possibly at a more local level within services
and the service will explore this further.
We will continue to find new ways to engage with staff and strengthen the ‘one
service’ ethos. We continue to work on an ongoing brand development programme
to implement visual consistency across the physical estate and digital materials.
A number of leisure centres, community hubs, facilities and workspaces have
had design elements installed from signage, installations, wayfinding and visual
branding over the last year.
Page 33 of 174

Page 34

communications plan evaluation 2024 - 2025
22 
LIVE HERE
It’s Your Place
Launched in December 2023, this ongoing campaign
aims to highlight issues such as littering, fly tipping,
graffiti and dog fouling which negatively impact on our
communities. 
We developed a campaign image to link the different
issues under one brand that aims to promote community
engagement – not dropping litter or allowing dogs to foul
the streets - as well as proactively improving communities
by carrying out litter picks or reporting fly tipping. We
have also issued messaging advising the public to be
careful using ‘man with a van services’ advertised on
social media. Investigations by SEPA show that corrupt
operators may dispose of the waste they collect through
fly-tipping.
A community recognition badge is used to thank groups
who have contributed to improving their local area, and
we plan to include a new category within the annual
Provost’s Awards.
As part of the campaign, we support Keep Scotland
Beautiful’s annual Spring Clean campaign. In 2024, 235
litter picks were carried out in North Lanarkshire, with
3,598 people taking part. Hilltop Primary School in Airdrie
also won the top prize in the Litter League competition
among schools in Scotland.
In May, the campaign also highlighted the community
groups which received grants from our Recover NL
initiative to carry out environmental improvements in their
local area.
We created dog fouling signs which the service erected in
hot spot areas to deter poor dog owner behaviour, with a
complementary social media campaign. 
Enforcement figures for financial year 2024/25 
Financial year 2024/25 Number of FPNs
Issued
Litter 581
Fly Tipping 83 
Dog Work 2024/25
Dog Fouling FPNs 0
Dog Fouling Patrols 296
Dog Fouling signs
erected 1,051
Stray Dogs Uplifted 71 
Dog Bag Deliveries
546 (over a million
bags distributed free
to residents)
• The Transport (Scotland) Act 2019 makes it illegal to
park on the pavement in Scotland, as well as double
parking and at dropped kerbs designed to allow
pedestrians to cross the road safely. The council
started to enforce this legislation in March 2025 but
the team promoted the new law from the start of
the year to raise awareness and pre-empt a change
in driver behaviour by creating warning notices for
parking attendants to place on vehicles parked
illegally.
• We assisted Food Standards Scotland to widely
distribute information about potentially contaminated
vodka containing the chemical isopropyl, which can
be harmful if consumed, that was circulating in a
North Lanarkshire town. This issue then escalated
as it was identified in other UK cities and became a
criminal investigation relating to potentially serious
organised crime. The local retailer’s licence was
revoked as a result.
Page 34 of 174

Page 35

communications plan evaluation 2024 - 2025
23 
Suicide Prevention
It is widely reported that poor mental health across the UK is becoming a bigger
issue meaning that preventative work and education around the issues have never
been more critical.
In North Lanarkshire, our strategy focuses on reducing stigma, reaching people in
their everyday environments, and ensuring consistent, compassionate messaging
that encourages people to talk, seek help, and support others. Over the last
year we have continued to target 16 to 24 year olds and 35-55 year olds with
two specially designed creatives. This has included delivering nearly 3 million
impressions and achieving over 26,000 click throughs to the webpage from digital
adverts on Google, Snapchat, Instagram, Facebook and Tiktok. Our engagement
rate has been at least four times higher than the industry average and the suicide
prevention films have been watched over 66,000 times this year alone. The youth
film focuses on the message that hiding your feelings can make things worse.
The second film appealing to a wider and older audience, urges people never to
assume that someone is okay and to persist in checking on and talking to them.
These figures show that our films have successfully engaged with audiences and
we are exploring concepts for developing an additional creative for the youth
audience as well as a new film for the 65+ audience.
Meanwhile we have continued to develop FeelWellNL, an innovative, holistic
interactive chat service that provides information and ideas for promoting mental
wellbeing while quickly identifying and signposting vulnerable people to the support
they need. Initially, access to the service was via discreet signage installed in
‘locations of concern’. However, recognising the increasing number of suicides
taking place within the home, we are now more focused on digital delivery.
We have trialled geo targeting and targeting by age and the results have been
promising. Throughout the year there have been 1,385 engaged users. Users
who indicated that they were ‘feeling bad’ and ‘didn’t see their mood improving’,
were asked if they had experienced thoughts of suicide within the preceding few
days. 61 users shared that they had felt suicidal. The response these people
received was developed in consultation with Samaritans and Breathing Space and
urged them to seek help immediately as well as providing them with a range of
appropriate contacts.
This message may well have saved up to 61 lives. 
Anyone can experience
suicidal thoughts...
Breathing Space 0800 83 85 87 / Samaritans 116 123
Page 35 of 174

Page 36

communications plan evaluation 2024 - 2025
24 
Scottish Housing Day
We supported Scottish Housing Day and its theme, Homes for Life by promoting how adaptations, technology and resources can
help tenants remain in their home as they get older.
As part of the campaign, a video was created and showcased on Facebook, featuring the tenants living in one of our retirement
housing complexes, talking about the benefits of living independently but with enhanced housing support. The video gained 325
likes, 80 comments and 37k views with a CTR of 96 and 41 shares. A second video highlighted the benefits of assistive technology
in living independently at home which also performed well. Email communications to 11,482 housing subscribers secured a 16%
open rate and 2% CTR. Our final post promoted the Making Life Easier project, had 1894 impressions which led to increased
interest and demand for the project.
Domestic abuse support 
services available to them.
Period products
Please take what you need
Taking
the pain out of
paying
CC
2022
Page 36 of 174

Page 37

communications plan evaluation 2024 - 2025
25 
LEARN HERE
Our Early Learning and Childcare (ELC) campaign creative once again supported the campaign for early learning
placement applications between December 24 and February 25. This year we generated 2,937 applications
which is in keeping with the birthrate for children who will turn three years of age for the 25-26 session. Using
advertising via Google ads and social media channels for five weeks, supported by organic promotion through
our nlcpeople channels, our early learning applications page on the website was accessed on around 35,000
occasions.
A consultation took place in early 2025 to determine views on school holiday arrangements.
We used several communication methods including GroupCall messages to all parents, carers and staff, posts
on social media platforms, emails to the 28,420 subscribers of school topics, website and reminders in the
education and families’ weekly bulletin.
A total of 22,840 responses were received during the consultation, representing a 250% increase from the
previous consultation. Around 32.6% of eligible parents/carers and 78.3% of eligible school-based staff took
part. Most responses came from parents and carers (71%), followed by teachers (13%). Overall, 66% of
respondents preferred Option A, which is broadly in line with the current arrangements.
We also supported a range of projects and awareness days with schools and early years facilities including
remembering Holocaust Memorial Day on the 80th anniversary of Auschwitz-Birkenau’s liberation and 30 years
since the Bosnian genocide at St Andrew’s High School, celebrating the reopening of Stepps Library with pupils
from Stepps Primary Schools and promoting diversity and inclusion for Pride Month with Kilsyth Academy
pupils. 
Page 37 of 174

Page 38

communications plan evaluation 2024 - 2025
26 
WORK HERE
Due to the significant 86% decline in customer demand and changing customer
preferences when it comes to financial transactions for council services, we worked
with colleagues in housing to devise a survey to ascertain views on proposals to
change the current first stop shop arrangements and whether to integrate face-to-
face customer enquiry services with local housing offices. The decision to approve
the new operating model was made that will integrate the First Stop Shop services
into existing housing offices and adopt a cashless transaction approach across all
remaining offices. Although this will not take place until June 2025, posters and
leaflets for existing first stop shops have been produced and announcements on
local MyTown channels published to ensure awareness of the changes from March
2025.
As well as the promoting employability initiatives through Brighter Futures, the
team also contributed to a range of measures to help secure bronze accreditation
in the Equally Safe at Work award for our work to advance gender equality,
prevent violence against women and for the steps taken to create a more inclusive
workplace culture.
As part of this, the team arranged a week-long promotion of sexual harassment
in July which coincided with the introduction of the new sexual harassment
policy, and included a statement of commitment from the chief executive,
highlighted training available and information on how to report incidents. In
addition, engagement sessions took place with staff and elected members and
an eye-catching promotional campaign including posters, leaflets and other
internal communications platforms extended through a programme of internal
communications.
A major new partnership between the council and global infrastructure solutions
company HOCHTIEF, was announced in September, with the aim of delivering
improvements, maintenance work and investment across the roads, footpath and
lighting networks and related infrastructure.
As one of the major enterprise contracts for the council, Corporate
Communications engaged early with the new contractor and with the previous
contractor to ensure an effective handover and to promote awareness internally to
staff.
Page 38 of 174

Page 39

communications plan evaluation 2024 - 2025
27 
INVEST HERE
Together with the work to drive interest in investing in North Lanarkshire through the Invest in North Lanarkshire
campaign and website, we promote major investment to the region, with HSBC Bank and Doble Engineering
recent additions to the area. Welsh engineering company, Envico, was another company that we promoted to
business media, as it expanded its UK operations and creating 20 new jobs.
At the start of the year, there was significant media coverage on the back of a release we issued that showed
North Lanarkshire entered 2025 on a strong footing following a year of positive business performance in the
local economy. There was a £2.21 billion increase in turnover by North Lanarkshire businesses in the year to
31 March 2024 with the number of registered businesses increasing by 60 in 2023/24 to 8,385. The number
of people employed by businesses in the area also rose to 97,960. We maximised figures published by the
Scottish Government’s annual Businesses In Scotland report, to demonstrate that total turnover of local
businesses reached £17.283 billion in 2024, up 14.7% on the year before.
We work closely with Business Gateway Lanarkshire, which is now in-house, to promote support services to
local businesses across the region. This includes promoting networking events to success stories. 
Page 39 of 174

Page 40

communications plan evaluation 2024 - 2025
28 
VISIT HERE
The North Lanarkshire Stories Trail funded by UKSPF, is a series of 12 original
short stories, written by Scottish storyteller Shona Cowie and illustrated by artist
Johnathan Chamberlain. Ten of these stories feature on installations designed and
built for the project to showcase the tales in in the 10 locations that inspired the
stories. Made from corten steel, each installation feature a cut out of a local type
of flora and a rubbing tile of an animal, both referenced in the story. A QR code
takes the user to the full story for that location on the website and to an AI service
offering the opportunity to ask questions of the main character. This allows us to
evaluate interactions.
Additional physical outputs include: 12 audio recordings of Shona Cowie reading
each story; a webpage for each story on the Visit Lanarkshire website; 500 printed
copies of a book featuring all 12 stories; a display located at North Lanarkshire
Heritage Centre and an additional story panel located outside the heritage centre
displaying the story related to Ravenscraig Steelworks.
The trail was launched in October and has been actively promoted since
January with online digital, radio and outdoor adverts as well as 100,000 flyers
distributed throughout Central Scotland. In the six months since launch there
were around 170,000 views of launch teaser videos; nearly 20,000 visits to www.
visitlanarkshire.com/stories; around 1.5m views of our online digital adverts
with a consistently higher than industry average click through rate. Meanwhile there
were 854 engagements via the QR codes at the signage locations. As the weather
improves, we can already see that this number is increasing rapidly and is likely to
continue doing so over the coming months.
Following a slow start, google figures show that the number of visitors to the Visit
Lanarkshire website is steadily increasing. The number of active users for the
year has increased by nearly 100,000, with a rising average dwell time and nearly
230,000 page views. Shoulder season campaign advertising in Autumn and Spring
has delivered consistently high engagement rates, ranging from two to six times the
industry average. 100,000 promotional flyers were distributed throughout Central
Scotland and Greater Glasgow to raise awareness of activities and days-out in
Lanarkshire. Organic web visits are up by 37% which suggest that the on and/or
offline profile of Lanarkshire has been further raised.
Page 40 of 174

Page 41

communications plan evaluation 2024 - 2025
29 
Arts, Culture, Sport and Leisure
A large amount of work is dedicated to driving
memberships and usage of leisure facilities or ticket
sales for performances, classes and workshops
across the entire Active and Creative Communities
service.
A dedicated campaign to raise awareness of the
annual pantomime and its return to a new venue
at Ravenscraig Regional Sports Centre was hugely
successful, which positioned the new location for the
panto as a new and exciting experience for audiences.
The campaigns team worked closely with the venue
team, Spillers Pantomimes and cast to create video
and photography content for use throughout the
promotional campaign. Photography of the cast was
used in promotional campaign graphics, while short
video content was created for social media channels
using a bright, exciting and humorous creative to
reflect the panto production and introduce audiences
to the characters.
The three main campaign videos, across all platforms,
were viewed 64,806 times, with over 600 comments,
shares and reactions and the biggest result was ticket
sales, which increased by 34% compared to 2024
with 20,632 sold.
In April 2024, Airdrie Town Hall became the sole
council entertainment and events venue, hosting
our popular what’s on entertainment programme,
which previously ran chiefly at Motherwell Concert
Hall & Theatre). We launched the first production, the
annual Easter pantomime, Rumpelstiltskin, working
with local panto actor Iain ‘Sheepie’ Smith in a video.
Promotional artwork focused on ease of access
and transport to the venue, to encourage previous
audiences of Motherwell to return to the events
programme.
previous audiences as well as the wider North
press, PR, print and outdoor.
Page 41 of 174

Page 42

communications plan evaluation 2024 - 2025
30 
The sports camps offered by the Active NL team
continue to go from strength to strength, with the
most recent camps, delivered over Easter school
holidays, seeing an increase of 741 attendees
compared to 2024 Easter camps (14% increase year
on year), reaching and engaging more young people.
The promotional campaign to support this activity
ran throughout March 2025 and targeted previous
participants of sports camps, as well as the wider
school aged community. Campaign graphics were
developed to be used across all communication
platforms to create a consistent look and feel for
the promotional activity, supplemented by video and
photography featuring real children and activities
undertaken at camps to give an insight into what to
expect.
Revenue for Easter camps was also up 37% from
2024.
The annual destination promotional campaigns
for Summerlee Museum of Scottish Industrial Life
saw creative return to a focus on previously used
photography to create familiarity with the audience, as
well as linking with Lanarkshire’s industrial past.
Active NL memberships are also thriving with several
campaigns set up throughout the year to boost
different types of membership.These included outdoor,
print, PR and digital activity, with a strong creative
focused on the positive impact of physical exercise.
Gym memberships overall have grown by 16.5%, from
30,048 in 2024 to 35,021 in 2025.
Supporting campaigns also contributed to specific
gym membership types including Active 60 in August
2024, with weekly targets set and exceeded. Through
customer testimonials, the team created video and
photography content to push a digital campaign on
social media and to previous members, which was
supported by print and PR. Memberships in this area
grew from 8278 to 9506.
In addition, a campaign focused on children’s
memberships also ran in August to coincide with
schools returning and families getting back into a
routine after Summer holidays. This campaign used
bold new campaign graphics featuring real children
with a focus on the Ultimate Sports membership with
membership rising from 399 in 2024 to 574 in 2025,
while single sports memberships for this audience also
increased (1405 to 1477).
The team also ran campaigns for golf season
passes in April and September, creating video and
photography to promote both the main season pass
and the winter pass. Memberships reached a record
1001 (up from 894 the previous year).
Page 42 of 174

Page 43

communications plan evaluation 2024 - 2025
31 
Internal Communications
With around 14,500 members of staff,
it is important that a more robust way of
communicating information at either low or
urgent level is devised. An ongoing issue is that
only half of staff have a work email address and
the team is currently working on an improved
process to address this. The roadshow was
undoubtedly the biggest commitment to staff
communications as a way of conveying more
details about the council’s vision and the
current programme of work. Feedback from
these sessions will help the team explore
further opportunities for staff engagement.
• We created 12 newsletters on behalf of the chief executive, with an average
of 2,862 views per issue.
• We issued 159 announcements to staff to alert them to news, events,
surveys or policy changes
• We promoted a range of initiatives including Cyber Awareness Week,
Mental Health Awareness Week, Sexual Harassment Week, Learning and
Work Week and serious and organised crime/counter terrorism information.
Digital First
We continue to maximise digital opportunities to
share information with residents, businesses and
partners. Our digital channels and platforms are
key to effective public engagement and thinking
‘digital first’ is crucial for communications.
Website
Our website, northlanarkshire.gov.uk, is firmly established as the key platform for
delivering services to our residents – more than 30 online forms linked to back-office
systems are now in operation. Total form submissions for 2024 exceeded 50k, up from
41k in 2023, representing a 21% increase.
There continues to be year-on-year growth in general website traffic, with more than
13 million page views (2024-25) compared to 10.5 million over the previous period
(2023-24), a 26% increase. 
Dates Page views
April 24 – March 25 13,222,404
April 23 – March 24 10,513,371
The recent addition of a chatbot on every page has made it easier for users to find
information and is our first use of AI within online customer services.
In the first six months of operation, there have been over 17,000 chat bot
engagements, resolving around 66% of enquiries. Over 7,000 calls are abandoned
but in the main, that is due to people dropping off the discussion before formally
terminating it. The digital team is constantly looking to improve the service. 
The website also continues to provide the basis for many communications campaigns,
most notably landing pages for Sum It Up and Period Dignity where social media also
played a key role in driving traffic.
Page 43 of 174

Page 44

communications plan evaluation 2024 - 2025
32 
Social Media
The digital team worked with colleagues to post
compelling content on our corporate social media
channels, which helped to increase our online
presence as the year progressed. With the exception
of X, which had a relatively small increase, all our
corporate channels saw a healthy increase in follower
numbers, most notably on TikTok, with a 419%
increase. 2024 was the breakthrough year for the
platform with a focus on tailored content, in particular
fun videos made for mass participation events like the
Broadwood Fan Zone and fireworks at Strathclyde
Country Park. Each event resulted in significant step
changes in follower numbers.
We also experimented successfully with live video
broadcasts on multiple platforms at the fireworks
event. 
Our diversified social media content strategy, reflected
in past years on new platforms like Instagram
and NextDoor, and now on TikTok, was further
complemented by the launch of a WhatsApp Channel
to leverage the huge audience potential of that
platform. 
We continue to develop the My Town community
social media channels, which are growing in strength
as we use them to engage with local businesses and
communities specific to the nine town areas in North
Corporate Social Media Channel Followers 
31-Mar-25  31-Mar-24
Total change
(24-235)
% change
(24-25) 
71715 67655 4060 +6.00% 
51933 51334 599 +1.17% 
5033 4378 655 +14.96% 
14612 12819 1793 +13.99% 
2764 533 2231 +418.57% 
42502  37034  5468  +14.76% 
1475  1370  105  +7.66%
Page 44 of 174

Page 45

communications plan evaluation 2024 - 2025
33 
Page 45 of 174

Page 46

communications plan evaluation 2024 - 2025
34 
April 24 – March 25 April 23 – March 24 
3839 2764 
647 697 
Date Number of bulletins Delivered to Open rate Click rate
April 23 –
March 24 424 3,322,307 37% 2%
April 24 –
March 25 366 3,172,640 38% 2% 
My Town Social Media Channels Followers Direct Messaging
The digital team continues to respond to direct
messages and enquiries on social media, providing a
fast-response service, alleviating pressure from calls
to the Customer Service Hub and other services,
enabling a more joined-up and improved service when
interacting with customers. Perhaps reflecting the
increased use of online forms and the success of the
chatbot, there has been an 18.5% decline in private
messages via Facebook and Twitter throughout the
business year, from 3,461 to 2,819.
Data Driven
The data collected and analysed during this period
has been instrumental in identifying gaps in our social
media usage, as well as providing evidence to support
our online marketing campaigns and inform our future
strategies.
Email Communications
GovDelivery remains the most engaging digital
platform with a far higher bulletin open rate (37%) than
nlcpeople Facebook’s post engagement rate (Likes,
Comments and Shares) of just 0.61%. 
Channel  31-Mar-25  31-Mar-24
Total change
(24-25)
% change
(24-25) 
My Airdrie 4893 4514 379 +8.40%
My Bellshill 4679 4570 109 +2.39%
My Coatbridge
My Cumbernauld
My Kilsyth
5932 5063
2131
2574
869 +17.16%
+23.13%
+0.93%
2624 493
2598 24
My Motherwell 5626 4857 769 +15.83%
My Northern Corridor 566 425 141 +33.18%
My Shotts 3180 3016 164 +5.44%
My Wishaw 4723 4392 331 +7.54% 
My Airdrie 803 731 72 +9.85%
My Bellshill 614 576 38 +6.60%
My Coatbridge 818 743 75 +10.09%
My Cumbernauld 425 355 70 +19.72%
My Kilsyth 398 374 24 +6.42%
My Motherwell 883 816 67 +8.21%
My Northern Corridor 118 96 22 +22.92%
My Shotts 689 682 7 +1.03%
My Wishaw 629 577 52 +9.01% 
Page 46 of 174

Page 47

35 
communications plan evaluation 2024 - 2025 
Brand and Creative
It’s been a busy year for the Brand and Creative team, producing striking and compelling
materials and content for campaigns, services and external clients. As a branding programme
continues, the team has created a range of templates for staff to use ranging from powerpoints,
headed paper, digital signatures and policy documents. A full brand guidance document is
underway. 
Any products on PDF format legally requires to be
accessible which increases the workload on each
project. A number of projects have required to be
translated, in either other languages or in braille.
The team undertook on Premiere and Aftereffects to
enhance digital and animation training skills to produce
materials such as short animations, gifs and visual
effects.
Over the year, the team worked on 674 individual
projects which created 981 pieces of graphic work, as
well as 25 external projects.
Highlights internally include all interior materials and
promotional campaign assets for The Hive, signage
for the new community hubs, the interior design
refurbishment of Broadwood Stadium, a programme
of refurbed signage for the civic centre campus and
supporting design work for events and campaigns.
The creative for the North Lanarkshire Stories Heritage
Trail was innovative and unique and the team drew on
their historical knowledge of the region to show their
creative flair. The resulting installations and books are
quite striking, and coupled with the interactive element
to the stories, gives rise to a fully engaging attraction
for visitors and residents.
A growing sector over the last year has been in
producing visual materials for external public sector
organisations such as Scottish Environment Protection
Agency (SEPA), Voluntary Action North Lanarkshire,
NHS Lanarkshire, Centre of Excellence for
Decarbonisation and the Scottish Serious Organised
Crime Unit. The team has created a suite of materials
and plans for SEPA and a range of brand designs for
other agencies.
The multi-media production team worked on a total of 54
large media projects, including animations, videos,
audio recordings and website projects. The team also
worked on 73 smaller multi-media projects.
The output of these media projects included a total
of 67 animations, 305 videos, 6 presentations and 33
audio recording sessions. We worked with external
clients including NHS Lanarkshire, National Parent
Forum of Scotland, City of Glasgow Council, North
Lanarkshire Alcohol and Drug Partnership, SEPA and
the Scottish Government. Notably we made a series
of 16 videos for The Hive women’s business incubator
which were central to the campaign’s success, as
well as 20 videos for Challenge Poverty Week, which
undoubtedly resonated with residents and drove
calls to the tackling poverty team. We also created
videos for the Lanarkshire Business Awards and an
interactive presentation for the awards night. The team
produced a heart-warming animation for Earth Hour,
using the words of a primary school pupil, which had
around 15,000 views on the night.
The impressive video and animation for The Plan for
North Lanarkshire roadshow was widely commented
on by staff, who described it as inspirational and
dynamic.
The team also developed and created a website for
the eight local authorities in the Glasgow City Region
for its Multiply123 campaign, producing video and
photography content that complemented the wider
advertising campaign. The website had 35,933 users
and 53,597 page views across the year to March
2025. Almost 20,000 people in the region participated
in a course with 2282 achieving a qualification.
Page 47 of 174

Page 48

communications plan evaluation 2024 - 2025
36 
Page 48 of 174

Page 49

communications plan evaluation 2024 - 2025
37 
Events
As well as the roadshow, which was one of the largest series of events undertaken, we arranged
and managed a number of large-scale and smaller events over the year, often with the support of
other services. Some key highlights are: 
Capitalising on the success of the national football
team getting to the event stage of the 2024 UEFA
European Championships, the council hosted two
themed fanzone events at Broadwood Stadium
in June, believed to be the largest in Scotland.
Operational support for both events was provided
in terms of compliance with licensing and health
and safety, technical assistance, outdoor furniture,
performance artists, and signage was installed to
ensure the events were safe, appealing and enjoyable. 
Social media was used extensively to promote both
events, in the lead up and on the day which attracted
1,058,311K people views. Reaching over 24,289K
engagements including reactions, comments and
shares (includes 838 saves).
Both events sold out in a matter of hours with around
5,000 attending. A family area was created, the big
screen for the match, as well as entertainment, stilt
walkers, fun activities for the younger age groups and
crucially, a street food market and bar in association
with THE BIG FEED Street Food Social. Tiered ticket
sales were arranged for zone areas, picnic benches
with capacity for 600 people and 320 in the barrel
sections with 4080 general admission tickets sold. :2.
Feedback on our social channels was extremely
positive and provided the local community with an
affordable and fun event that supported a global
celebration of football and delivered a high-quality
event with community value.
The council hosted a special celebration to mark the
historic occasion of The Royal Regiment of Scotland
(SCOTS) being granted the Freedom of North
Lanarkshire in July.
The organised parade recognised the Regiment’s
dedicated service to the country and local area and
featured around 120 SCOTS soldiers, accompanied
by their equine mascot, Corporal Cruachan IV who led
the military pipe band parade from Dalziel High School
to Strathclyde Country Park. A short ceremony took
place on the lochside to celebrate this honour.
Social media was used extensively to promote this
well-attended parade, which attracted 275,385k 
people views. The event received over 3,090K
engagements including reactions, comments and
shares.
Our annual fireworks display at Strathclyde Country
Park, which attracted the largest crowd ever, of
approximately 50,000 visitors. As well as arranging
event logistics, we promoted behind the scenes
preparations, information on a web page, posters
and banners were on site, a large screen was on site
on the night of the display, information in all council
locations and social media posts in the run up to the
event and on the day. On 5 November we posted
live streamed coverage of the fireworks display at
Strathclyde Country Park.
The annual Provost’s Awards took place in September
2024 and involved arranging the practical logistics Page 49 of 174

Page 50

communications plan evaluation 2024 - 2025
38 
of the event to procuring a celebrity host who also
provided entertainment. Elected members and
members of community boards nominated individuals
and groups from their communities who deserved
recognition for their outstanding contributions to
supporting people and communities with 37 award
winners selected across the nine community board
areas.
In the lead up to the event and just before the display
burst into production, we received 727,836K people
views with maximum 111,517 people views when the
‘live stream’ started. The event received over 10,135K
engagements including reactions, comments and
shares.
We arranged a free Christmas partnership event on
behalf of Coatbridge Town Board in December which
included a live stage hosted by Heart radio and a mix
of entertainment from local groups, dance schools
and choir, mascots and fun filled stage games with
prizes. Following promotion on the local MyCoatbridge
channel and posters and flyers around the town
centre, around 200 people attended on the day.
The event manager continues to provide specialist
advice to and chairs the multi-agency safety advisory
group (SAG) for the North Lanarkshire area, providing
guidance and assistance to allow public events to be
successfully run safely and in compliance with relevant
legislation. The council’s Safety Advisory Group (SAG)
received 27 direct enquiries from both council and
external event organisers throughout the year with 19
required to go through the SAG process.
Page 50 of 174

Page 51

communications plan evaluation 2024 - 2025
39 
How we work
We utilise the full range of communication disciplines: campaigns and marketing;
strategic consultancy; digital, brand and creative support; PR and media relations; internal
communications; and major events.
How and why we communicate information is
governed by our communications operating
model. The speed of changes in digital technology
means our operating model and team need to be
agile, multi-skilled, engaged and crucially, digitally-
skilled. Through our communications platforms
and the complementary services within Strategy
and Engagement, we offer residents, communities,
partners, businesses and the media more choice in
how and when they engage with council services.
These processes keep people informed, drive action,
generates behavioural change and participation and
can contribute to enhancing the lives of people in
North Lanarkshire. Improving that process will always
be central to our activity and looking forward, digital
processes, technology and platforms will constantly
be reviewed and updated.
We aim to provide a professional standard of practice
to support the council and the operating model
comprises three core areas: core competencies and
training, standards and systems; governed by an
assurance framework. By identifying and improving
skills, creating guidance and templates to ensure
consistency and standards and a range of support
tools, our communications and service will be
more organised with systems in place to support
staff in their professional development as well as to
accomplish their work. Page 51 of 174

Page 52

communications plan evaluation 2024 - 2025
40 
Our communications are:
Community-focused: we will foster a sense of community spirit that is supportive. By championing
certain types of behaviour or attitudes we can strengthen communities. We will promote community
empowerment and participation.
Challenging: our communications can be confrontational and inspiring to generate behavioural change.
If we need to be frank with the public on issues, we’ll use forthright language to encourage people to
address and change their behaviour and challenge those around them.
Informative: our work should direct people to information so they have improved access to services
and advice but also demonstrate how services make a positive impact on people and communities.
Encouraging take-up of enhanced services through digital offering will be championed as we help
people to help themselves, assisting to make our communities more resilient and capable.
Inspiring: enlightening to residents and businesses about what already exists and what we are planning
to do in North Lanarkshire. We will reinforce our vision for the future, vitalise our communities with our
ideas and work collaboratively.
Creative: we will use the full range of creative skills to ensure our messages are compelling, whether
through video, photography, design or in writing.
Responsive: we will be quick to respond in times of an incident or an issue occurring to assist the
public, services and partners, as well as being fleet of foot in the digital realm.
Practical: whether responding to an emergency situation or to assist people in acquiring a service,
communications needs to provide realistic and reassuring advice using language easily understood by
people. 
The role of communications is important to the
operations of the council, with increased accountability
on how it supports service delivery.
The emergence and increased use of AI, automation,
and changing communication technology and
algorithms and an increasingly fragmented social
media landscape means that the team must keep on
top of industry trends to ensure cut-through in our
communications. A focus will remain on good quality
content over frequency, ensuring that messaging is
targeted and better evaluated through analytics.
Shaping and embracing AI into our operating model
will be crucial, while adapting to the challenges it can
bring. Communications should be at the forefront of
this type of technology, moving at a faster pace with
foundations based on factual insight.
We will be smarter in our audience segmentation
and messaging, ensuring information that is relevant
is distributed to the right people. AI and improved
audience analytics will enhance this.
A focus on local will be key going forward. Working
closely with colleagues in the other Strategy and
Engagement sections will assist in relationship-building
and dissemination of information locally.
The communication tools we use and what we
say should be authentic, realistic, inspirational and
meaningful. And that means understanding our
audiences better and delivering high-quality, relevant
content. It should also be more two-way, where
we listen to residents and respond with helpful
information.
We use the OASIS planning tool to ensure
our work has a defined outcome that can be
evaluated:
Objective: our campaigns will have a clear
intended outcome.
Audience: we will define the audiences for each
campaign to ensure we reach the relevant people.
Strategy: before we do any creative work we will
define the strategy for each campaign which will
guide us throughout the life of the campaign.
Implementation: our execution will be creative,
bold and provocative. It will maximise the
opportunity to change behaviour and achieve the
outcome.
Scoring: we will set out how we will evaluate
our work for each campaign in advance, the
most significant measures will be those that
demonstrate the outcome as opposed to reach or
awareness-raising.
We have highly-skilled people. Communication
techniques in a digital world evolve rapidly, so we
will ensure our skills are kept up to date, utilising
the latest technology and sharing knowledge.
Page 52 of 174

Page 53

WWW.NORTHLANARKSHIRE.GOV.UK Page 53 of 174

Page 54

Page 54 of 174

Page 55

North Lanarkshire Council
Report
Policy & Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    SP/ST Date 05/06/25 
Leadership & Operating Model – phase 2 progress update 
From  Stephen Penman, Chief Officer, (Strategy and Engagement)  
E-mail PenmanSte@northlan.gov.uk Telephone  07947 997750 
Executive Summary 
As outlined in the leadership and operating model report presented to committee on 05
December 2024, the delivery plan within the approved One Service programme of work
aims to facilitate the Council’s transition over three phases within the next 10-15 years
towards a fully integrated town and community hub operating model. 
This progress report sets out the developments that have taken place in the last 6 months
and presents a positive update in terms of Hub service uptake whilst outlining the next
steps, challenges and mitigating actions. 
The report highlights that intrinsic to the phased transition are connections and
dependencies across the plan for NL programme of work with critical dependencies
between hub strategy and development, corporate asset management and approved
rationalisation, digital transformation, community wealth building and strategic workforce
planning by Council services - together with acknowledging the landscape faced by the
community and voluntary sector and the public sector reform that lies ahead. 
The report seeks approval on plans and direction set out. 
Recommendations
It is recommended that Policy and Strategy Committee: 
(1) Acknowledge the progress made since the last update to Committee on 05
December 2024 where the employment of the officers to coordinate and strengthen
hub delivery plans was approved.
(2) Support the acceleration of plans by helping to build presence and understanding of
the hubs and their benefit to the local community and inspire greater involvement
from local people and community and voluntary sector organisations in support of
the local outcome improvement plans (LOIPs).
(3) Recognise and help mitigate some of the practical challenges described as we
increase our focus on a community led approach to the community hubs.
(4) Approve the direction set out with a further report on progress to be presented to
Committee in December 2025. 
Item 3
Page 55 of 174

Page 56

1. Background 
1.1 This report is an update on the Leadership and Operating Model and asset
rationalisation delivery plan discussed at Policy and Strategy Committee on 05
December 2024. 
1.2 Members will recall from the December meeting what phase 2 of the approved three
phased Leadership and Operating Model programme sets out to achieve, see
Appendix 1. Fundamentally, a new and more integrated place-based service delivery
model means that we need our assets to work differently across a community,
particularly with a declining school age population and rising elderly adult population,
whilst meeting the needs of a more distributed workforce working across communities
and within people’s homes. This means providing the ability for identified teams,
supports, activities and services to be consolidated into or delivered from hubs and
other assets to have a greater impact on improving equity and health outcomes across
North Lanarkshire. 
1.3 Community hubs, in line with the council’s approved strategy, target operating model
and programme of work delivery plan, should act as a gateway for support and services
and for early intervention, preventative support and targeted activities based on local
needs. This to be achieved through greater integrated community and Council-run
activity. This was reinforced within the report “Delivering the Programme of Work – key
achievements” presentation to Committee on 13 March 2025 on the delivery of whole
family support, digital connectivity and supports the approval at the same Committee
relative to the First Stop Shop service redesign and alternative delivery of local housing
support and surgeries. 
1.4 Furthermore, the developing hub offerings and modern well-equipped spaces available
for community use should support delivery of the local outcome improvement plans
(LOIP’s) that are facilitated through the community board structure, locality partnership
teams and locality planning groups – as well as improved outcomes in line with the
plan for NL. 
1.5 As approved by Committee at the December 2024 meeting the employment of three
community hub co-ordinators to progress phase 2 and support the transition over the
next 2-years is a step forward to accelerate plans, evidenced in the report below. 
2. Report 
2.1 This report provides an update on the elements of the leadership and operating model
delivery plan accelerated following Committee on 5th December 2025 and aims to
clearly outline the breadth of transition activity underway, with supporting Appendices.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work One Service
Page 56 of 174

Page 57

2.2  The report focuses on two main areas: 
1. Progress within phase 2 since December 2024 including: 
• Implementation of the Community Hub Coordinator role
• Council and strategic partner organisations provide a core offer
• Community led approaches and increasing third sector presence
• Business process improvements, hub adaptations and infrastructure
enhancements all critical to successful operation of the hubs and advancing our
plans 
2. Forward plan of next steps and the risks and mitigating action for this phase 
Progress within phase 2 since December 2024 
Implementation of the Community Hub Coordinator role 
2.3 Three hub coordinators took up their posts on 20 January 2025. The role whilst being
responsible for ensuring smooth day to day operations of the hubs, is working across
Council services, partners and communities to shape the delivery of a range of ‘needs
based’ support, information, advice services and activities in the hub. As part of our
aim to increase presence of the hubs and build a greater understand of the value they
add to the local community the team have hosted c.54 tours with c.230 individuals
reflected in the increased uptake to access space for delivery of supports and activity
and the forward plans outlined in the following sections of the report.  This engagement
builds on co-design work previously reported to this Committee in December 2024 to
understand local needs through the work on ‘Getting it right for everyone’ and ‘Whole
Family Support’ as well as individual service knowledge and data insights. 
2.4 To build solid foundations for developing the approach in each hub, a hub activity
analysis was first carried out for each hub to understand the profile of use since
opening and how the range of activity fits with local needs and priorities. Members may
recall a similar exercise presented to this Committee on 16 March 2023 for all Council
assets across Community Boards. The detail of this analysis for each hub is provided
in Appendix 2 and also provides a baseline measure against the approved hub guiding
principles 1, 3 and 6 (see below image 1.0) as we work to meet and address local
needs and realise the c.£66.9m investment made that will, of course, take time to
evidence through the plan for NL health check indicators. 
2.5 Overall the analysis recognises the hosting of a range of activity and a growing use of
hub spaces. It recognises the demand for outdoor sports facilities and a particular spike
in the use of indoor community spaces in the last 12 months and since the last report
was presented. Growth and opportunity areas are reflected within the report, and we
expect to positively impact the range of activity evidenced in the next annual analysis
through Q2 and Q3 2025/26 plans as described in Appendix 2. Work is also ongoing
with Community Facilities to ensure data and activity is consistently recorded across
all hubs, and with the asset and procurement team to reconfigure spaces as required
to maximise usage and occupancy of the spaces. 
Page 57 of 174

Page 58

Image 1.0 Hub guiding principles 
2.6 The community hub coordinators are now chairing their relative hub delivery boards,
as per the previous approach and terms of reference approved by Committee on 16
March 2023 and as can be seen in image 2.0 below. The hub delivery boards for
Riverbank and Chryston were mobilised at the end of March 2025 following the issue
of a survey to parents and families of the young people attending the schools and
nursery establishments within the hubs as a first step. 
2.7 Engaging the local parent councils to agree the survey and the engagement of local
parents and families was key to build on the original design objectives for each hub,
set out in image 2.1 below. These were each approved following hub strategy and
development consultation exercises, and our forward plan is to ensure these objectives
and all plans for hubs impact positively on the plan for NL health check indicators as
illustrated in the example in Appendix 3 for Newmains & St Brigid’s. 
Image 2.0 Chryston Hub delivery board March 2025 meeting in the HUB STEM
room 
Page 58 of 174

Page 59

Image 2.1 Hub objectives established as part of the design brief consultation 
2.8 The already established Newmains & St Brigid’s delivery board is shaping the plan for
2025/26 with Q1 25/26 plans illustrated in this report and associated case studies
within the Appendices 5 and 6-9 provided. 
2.9 Concurrently, in support of our transition towards a community led approach, wider
stakeholder and community engagement is ongoing as part of the ‘Working with
Communities’ framework. The coordinators attended the recent cycle of Community
Boards and are working closely with the community partnership team to identify and
engage local community and voluntary sector organisations to build presence of the
hubs and look at how the hub as a delivery vehicle can support the local outcome
improvement plans. This has resulted in the development of stakeholder maps and
c.54 hub visits by individuals including Elected Members and local community
organisations to see the hub and its spaces, leading to agreement for services and
organisations to operate from the hubs some of the week, as reflected in section 2.3,
the hub timetable provided in Appendix 4 and the following sections of the report. 
Council and strategic partner organisations providing a core offer 
2.10 Having the capacity through the hub coordinators to directly engage with Council
services, partnership organisations, community, voluntary sector organisations and
including our commissioned services is driving greater understanding of the hubs and
the opportunity to increase reach and offer support in the heart of communities.  An
update on Council and wider current and planned delivery from hubs is set out from
section 2.11 to 2.34 below and illustrated in the timetable presented in Appendix 4. 
Whole Family Support 
2.11 In line with the Resilient People programme of work, accessible and inclusive family
support has continued to be delivered by the universal family support service, named
Families Here and Now Service (FHANS). Piloted from the Newmains and St Brigid’s
hub area in April 2024 FHANS have developed their capacity and since January 2025
scaled across North Lanarkshire, now based in every community and delivering from
the three Community hubs. 
Page 59 of 174

Page 60

2.12 In the first three quarters FHANS have evidenced successful integration into existing
GIRFEC support pathways and structures with most referrals being received from
education, social work and health. Delivery from community Hubs has developed in
line with the new operating model and community need. Although FHANS have been
delivering across communities for only 6 months, the result is local, community-based
support that reaches out to communities, and delivery of a broad range of practical,
emotional and group interventions to whole families at the earliest, preventative time. 
2.13 To facilitate integrated planning and continually responsive delivery, FHANS are
coordinated by a named contact for each area. The highest accessed intervention is
1:1 support. Wider intervention in each community area can differ, for example in
Bellshill FHANS were asked to respond to needs of a group of young people within a
school by establishing a peer support group that would move into the community to
meet greater need, while aligning with the principle of peer mentoring and developing
sustainable approaches to support. With Orbiston Community Hub due to open in Q3
2025/26 the service will operate from there. 
2.14 Each Hub has a weekend family activity-based support and a drop in on a Friday,
planned intentionally to offer support ahead of the weekend for families. As drop-ins
develop, these will be increasingly integrated, offering access to tackling poverty,
employability resources or any other identified support need as described later in this
section of the report. 
2.15 The overall impact of the FHANS service supported by delivery through community
hubs and the place-based approach as reported to Education and Families Committee
on 20 May 2025 is demonstrating positive impact and evidence against the measures
of success outlined in section 3.1 of the report.  
2.16 North Lanarkshire Carers Together are commissioned to deliver a Family Support
Service to parent carers and their child or young person living at home who has a need
for additional support. The Neurodevelopmental Family Support Service is tailored to
meet the needs of each individual family. The hubs provide an accessible space which
enable NL Carers Together to have a base within local communities to meet with
families, children and young people when required. Out of 248 families who accessed
support over the past year, none escalated to intensive services and across both early
help services there have been fabulous examples of integrated, partnership working
for families which offers a no wrong door. In addition to this, they provide staff within
the Neurodevelopmental Family Support Service with a functional working space to
meet the increasing demands of the service.  Appendix 4 illustrates when the hubs
are being used to provide this. 
Community Learning and Development 
2.17 In addition to what was outlined in the 05 December report to Committee, CLD have
regular weekly bookings in the hubs for the delivery of Solihull parenting groups,
holiday period bookings and staff and partnership zone usage through term time. An
ASN Family Easter programme was held at the Newmains Hub during the holiday
period, welcoming eight families who enjoyed a range of activities and offering a
welcoming space where families could come together, take part in engaging activities
and access support. 
2.18 The Adult Learning team now delivers the “Digital Skills for Life” project for adults
across North Lanarkshire. Currently groups for this project are delivered within a range
of community and library-based settings with numbers ranging from 5 to 12 individuals
attending. The community hubs present additional opportunities for the project to
Page 60 of 174

Page 61

engage with local people in places they often go in the heart of the areas in which they
live. Through the hubs CLD practitioners are enabled to engage with parents and
families, providing them with the ability to gain key digital skills to support their children
and young people. Over the coming year we hope to have new groups within the hubs
that improve the digital skills of local people within their communities, building on the
pilot being introduced to Chryston Community Hub described in section 2.38. 
Housing support 
2.19 Wishaw/Shotts locality team use the Newmains and St Brigid’s Hub to facilitate weekly
void meetings between Housing Services, Property Services and Mears. With the
recent First Stop Shop (FSS) consultation and review approved at Committee on 13
March 2025 and the planned integration of support into the locality housing model more
housing related functions will be delivered from hubs, and in partnership with the
tackling poverty team and Routes to Work, in the coming months including: 
• Housing surgeries, both locality management and central rents teams 
• Financial assessment & income maximisation
• Support with employability pathways through co-location with routes to work
colleagues
• Homes First client reviews
• Chairperson’s quarterly meetings 
2.20 These functions have been identified based on knowledge of demand and they set out 
to deliver support to our highest priority communities whilst addressing the challenges 
presented by the current financial landscape. The appointment of the Hub Coordinator
working in partnership with council services will ensure resources are used effectively
and efficiently and allow for shared knowledge across teams, particularly with the plans
to leverage use of digital zones. 
2.21 The tenant participation team are beginning to use the hub shared workspaces when
working in the local community and the Annual Tenant’s conference for 2025 will be
held at Chryston hub. See testimonial in Appendix 10 from a tenant participation
officer who regularly accesses Riverbank hub. 
Tackling Poverty 
2.22 In 2025, the Tackling Poverty Team continue to operate within the Hubs carrying out
the day-to-day activities listed below, and from 29 April began to offer appointments
for residents in the Newmains Hub, Riverbank Hub and Chryston Hub in tandem with
Routes to Work. 
• Continue operating from hubs to be based within the community
• Provide a face-to-face service through interviews relative to income maximisation,
money advice, and form filling/assisted self-service 
• Establish a diarised appointment service for mandatory reconsiderations and
appeals 
• Deliver financial education sessions
• Enable greater collaborative working with other Council Services and Partners 
• Work locally with new voluntary and third sector groups in the community that have
not been engaged previously 
2.23 A diarised appointment service for mandatory reconsideration and appeals in
Newmains, Riverbank and Chryston Hubs took effect from May 2025. With our
Page 61 of 174

Page 62

continuing presence in the Hubs, we are further developing our collaborative working
with other services and partners, whilst increasing our financial education offer via
Multiply Project (Sum it Up), through 2025. 
University Health & Social Care partnership (UH&SCP) / Adult Social Work 
2.24 An initial scoping meeting at Chryston Community Hub took place with UH&SCP
colleagues in January 2025 to discuss how to increase health promotion and early
intervention support from hubs as we implement the national ‘Getting it Right For
Everyone’ (GIRFE) practice framework. This resulted in the agreed delivery of
cognitive behavioural therapy (CBT) and physio sessions from the Newmains & St
Brigid’s community hub and planned use of Riverbank community hub to host Perinatal
Mental Health services i.e. a ‘Finding Me’ group with new parents with babies up to 1-
year old from 20 August, as well as a ‘Circle of Security’ peer support new parent group
from 03 October 2025. Further plans to expand and target other areas are in planning.
UH&SCP teams are visiting and using spaces with teams to build greater awareness
of the hubs and their spaces. 
2.25 In recognition of the Northern Corridor local outcome improvement plan (LOIP’s)
priority around ‘Health Inequalities’ and need for focused action in this area, a planning
session took place in April 2025 at Chryston hub to initiate improvement action. The
Integrated Joint Board (IJB) meeting is also planned at Chryston hub for August 2025. 
2.26 At Chryston community hub NHS services deliver appointments from the health wing
of the hub (see Appendix 4) and includes addiction and rehab services, anticoagulant,
CAMHS Neuro, child immunisation, midwifery, phlebotomy, physio, podiatry,
psychological therapy, sexual health clinic, speech and language therapy and
treatment room. Self-referral services are promoted across wings in the hub. A Health
Walk now leaves from the hub each Friday morning. An ActiveNL Slim Start class starts
on 11 June 2025, and new fitness classes are in planning to respond to the ActiveNL
waiting list in the area. Further developments will be taken forward as part of the LOIP
subgroup mentioned above in section 2.25. 
2.27  In partnership with UH&SCP, Strathclyde University and Mari One digital health care
solutions the operating model team and colleagues from Active and Creative
Communities supported the delivery of phase 1 of a remote health monitoring project
with a view, longer term, to facilitating pre-frailty interventions.  A cohort of participants
who are Active60 members took part following their involvement in GIRFE co-design
work. The participants were monitored through wearable devices at home and
attended weekly drop-in clinics at Newmains & St Brigid’s Community Hub (see
Appendix 6). Phase 1 had a 100% retention rate with the testing of devices proving
reliable. Plans for phase 2 will seek to scale the project to accommodate c.250 people,
dependent upon approved funding, with the hubs continuing to support our place-
based delivery approach. 
2.28 Changing places toilets within the community hubs have had their first annual
inspection with a maintenance plan now in place. Engagement with colleagues in
UH&SCP and Promoting a more inclusive society (PAMIS) has resulted in these
spaces being promoted to the local community for use, this will support work to
enhance our offer for those who need. Wider partnership work is underway across
Council services following an assessment of existing known facilities across our asset
portfolio in support of our equalities and carers strategy deliverables. 
2.29  The NL Disability Forum commissioned by the UH&SCP and fundamental to our
community planning provide support to promote good mental, physical and emotional
Page 62 of 174

Page 63

wellbeing. They have a weekly presence in each community hub as illustrated in
Appendix 4. Further discussions are underway relative to the presence of the
Community Connectors as we see greater service integration and an increase in
footfall at the hubs during 2025. 
2.30 Building on this, the UH&SCP making life easier (MLE) and disability information team
visited each of the hubs over April 2025 and are planning to trial the delivery of blue
badge assessments and MLE clinics promoting the online support available and
offering assisted self-service support in the local community. 
2.31 In support of our commitment to being a trauma informed organisation and following
the launch of a Trauma Design in the built environment toolkit in May 2025, as
presented to Wellbeing and Tackling Poverty Committee on 25 April 2025, we are
working in partnership with Health Improvement colleagues to implement annual
trauma walk throughs of the hubs and other service delivery spaces. This also supports
our equalities strategy deliverables under approved outcome 8 “Our buildings, places
and spaces are safe, vibrant, inclusive and accessible, better serving the needs of
people with protected characteristics through effective planning, design and
development”. Sections 2.42 through 2.55 later in the report also affirms our attention
to trauma design and improvements and space adaptations to enhance the customer
experience. 
Active and creative communities 
2.32 The local provision of Yoga and Zumba fitness classes at Newmains & St Brigid’s Hub
has been running for over a year now. The success of these continues to grow with a
new body attack class being offered from April.  See Appendix 7 for information on
uptake and testimonials - note that there is a general behaviour of drop offs after the
post-Christmas period, attendance rises again over the course of the year. Active and
Creative Communities (ACC) are part of all hub delivery boards with work underway at
each hub to identify further opportunities to work together, including introduction of Slim
Start sessions, enhancing our family support offer (described in sections 2.11 through
2.16) through the provision of childcare/activity groups with FHANS and CLD, as well
as activity programmes to leverage the outdoor gyms installed at the hubs, support
staff wellbeing and respond to feedback from the Chryston Community as activities
move into the new Chryston high school extension within the wider Chryston hub
campus. 
Employability support 
2.33 Council funded employability services have become increasingly represented in Hubs
through the ALEO Routes to Work Ltd offering employability information sessions and
booked appointments over the last 6 months.  These Hub sessions complement the
existing network of sessions run by the organisation in community facilities across
North Lanarkshire. The sessions continue to offer support to the target groups for
employability that are economically inactive, unemployed, or underemployed with a
particular focus on low-income parents. 
2.34 There has also been increased integration with other services present in the hubs such
as family support, tackling poverty and CLD given the shared priorities of these
services with employability. Sustained and increased presence in local Hubs and
increased integration with other services continues to be the aim for 2025/26 and as
we move forward, and the hub model grows. 
Community led approaches and increasing third sector presence
Page 63 of 174

Page 64

2.35 There have been several community-led activities taking place across the hubs in
areas of active travel, sport, fitness, intergenerational digital skills, and affordable
access to the arts. A community-led approach, approved by Committee following the
16 March 2023 report, is key to phase two of the delivery model to foster community
engagement, create more collaborative relationships and strengthen local connections
with the hubs. The approved investment in the hub coordinator roles will only grow the
community-led approach and help to facilitate an increase in local offerings through
2025/26 building on the case studies provided in Appendixes 8-10. Consequently, the
community consultation survey developed in 2023 has been updated (see link to digital
version in Appendix 11) to support engagement and participation during Q1 and Q2
2025/26 and this will be supported and promoted through the Working with
Communities framework. 
Promoting active travel 
2.36 Our work across the hubs aims to increase use of the active travel infrastructure and
promote walking, wheeling and cycling. In March 2025 Getting Better Together Shotts
(GBT) delivered 3 cycle days at the Newmains & St Brigid’s, and Chryston hubs in
partnership with the community hub co-ordinator and education and families. 
GBT are an experienced provider of cycling initiatives across North Lanarkshire
delivering SVQF qualifications and training opportunities with different schools. These
events were part of a ‘Paths for All’ funded initiative to increase access to cycling. On
the day young people were encouraged to cycle to school where they had their bike
serviced by a qualified mechanic. Where a basic service could not be provided on the
day the young people were given a voucher to use at ‘Trackside Bikes’ the GBT training
facility. Any young people who did not have bikes with them got access to bikes and
scooters by GBT for fun activities. GBT will continue to work with education to provide
families with a free bike, where a need is identified. Appendix 8 provides more detail,
imagery and testimonials with Appendix 15 demonstrating new infrastructure to help
advance our plans in this area. 
Intergenerational digital skills programme(s) and digital safety initiative 
2.37 A 4-week partnership project ran during March 2025 with the Newmains Community
Trust (NCT). This was a digital intergenerational project with ten P7 school pupils and
a group of 4 older adults’ from Overtown ‘The Gamechangers’. The project was
designed and coordinated by a Community Education student from University West of
Scotland (UWS) on placement at the NCT. It was based on an identified need for
increasing digital skills among the older adult group. The NCT recognised that the hub
facilities including e-learning zone, and multi-purpose rooms would be a good fit for
delivery of the project. On Tuesday afternoons participants met in the hub where P7
pupils shared their digital knowledge with adults and helped solve basic problems on
their devices e.g. text size on mobiles, using Skype, and online shopping.  See
Appendix 9 for feedback.  
2.38 At Chryston Community Hub, the Hub Co-ordinator has been engaging in needs-based
conversations with the Head Teacher and Parent Council which led to a request for
support around online safety. It was identified that young people and their parents have
been negatively affected e.g. instances where young people have faced confrontation
due to a breakdown in online relationships with peers, explicit content being viewed
online content, and an identification of a lack of knowledge and understanding of how
parents can ensure their young people are safe online. Subsequently the Hub
Page 64 of 174

Page 65

Coordinator has partnered with Community Learning and Development (CLD) Digital
Skills for Life team to develop a learning course on online safety for local parents. This
course is currently being advertised to parents in the Chryston area and will commence
in May 2025. Further opportunity to scale this given the common concern across
communities served by our hubs and leveraging whole family wellbeing funding and
links with the third sector is being explored. 
Sport and fitness - Get Walking Lanarkshire 
2.39 Under the umbrella of ‘Paths for All’ this is a pan Lanarkshire project with NHS
Lanarkshire. The project runs biweekly on Saturday mornings and starts and ends at
Riverbank Community Hub. The aim of the project is to tackle physical inactivity, poor
mental health, increase social inclusion, improve health and transport inequalities
through the delivery of volunteer-led community health walks across Lanarkshire.
Health walks are free, no longer than an hour, led by trained volunteers on risk-
assessed paths and go at a gentle pace. We are promoting wider use of the hubs with
participants and looking at how the organisers can use the community room for walk
leader training days or volunteer meetings. See imagery in Appendix 10. 
Sport and fitness - Bushido Karate Club 
2.40 This weekly class, running on a Monday evening, was started as a community member
felt there was no local sports club for the young people within the area to get involved
in. When the Riverbank Community Hub opened it was seen as an ideal venue and
central location to provide an opportunity. The class has members training from the
age of 6 years, which also includes parents training alongside their children, allowing
for family support for all to get involved in without age being a barrier. The club
welcomes everyone to come along and train and enjoy the benefits of martial arts with
the focus on Health and Wellbeing. The class seeks to support its members through
an increase in confidence, motivation and life skills learned while having fun, learning
a new sport and making new friends. Currently there are around 14 students training
weekly and through the Community Hub Coordinator they are looking for support to
grow the club further through 2025. See promotional leaflet and the club in action at
Appendix 10. 
Affordable theatre in the local community 
2.41 A pilot project is in planning at the Newmains & St Brigid’s hub with the community
theatre group ‘Spotlight Shotts.’ Given the potential of the drama box and theatre space
provided in the hub, and the opportunity to maximise usage of these spaces, the group
are working alongside the community hub co-ordinator to bring an Autumn show to the
Newmains Community. It will be a Halloween special of the famous ‘Singing Kettle’ on
12 October 2025. The aim of this initiative is to provide low-cost access to the arts
within the heart of communities to otherwise excluded groups contributing to our
aspirations around social value and inspiring brighter futures. There is potential to
scale this across the other hubs if the pilot successful. 
Page 65 of 174

Page 66

Business process improvements, hub adaptations and infrastructure enhancements
all critical to successful operation of the hubs and advancing our plans 
Visitor management and customer experience 
2.42 Members will recall from key learnings outlined in the 05 June 2024 report, and
associated community survey feedback, that there is still work to do to break down the
perception of hubs as schools. It’s key that the operating model delivery team continue
to assess the customer experience as part of a data led approach to guiding decisions
and future planning as the hub network grows, and in support of our commitment to
being a trauma informed organisation as presented to Wellbeing and Tackling Poverty
Committee on 25 April 2025. Consequently, a visitor management process has been
implemented that seeks to ensure a welcoming experience for external partners and
visitors, and to reduce the confusion that on site education staff and facilities support
staff have experienced with visitors attending for non-education services.   
2.43 A sign-in process has been introduced that helps the coordinators to track hub usage
and allow on site staff to know who is using hub spaces. A numbered fob can now be
signed out to visitors allowing appropriate access to identified areas whilst maintaining
safety and security protocols relative to safeguarding. This ensures easy access to
welfare facilities, shared space for agile working and booked community spaces with
fobs left in a drop box and signed out on exit. 
2.44 A customer experience survey is also now available via QR code to capture real time
user experiences and allow any improvement action to be taken or indeed positive
feedback to be acknowledged. Other survey versions will be available as required (see
Appendix 12 for digital version). 
2.45 Digital information screens are in the process of being installed at each hub. Indoors
these will be connected to the Council’s OneLan system, to supplement the leaflet and
poster resources on display. This is to enhance sharing of information and signposting
of supports, activities and services digitally in reception and waiting areas and
responds to feedback from the GIRFE co-design process on community hubs.
Outdoors new digital monoliths have been installed to support the promotion of active
travel routes, health, and wellbeing supports, activities and services - see Appendix
15. 
Corporate Booking System and online presence 
2.46 The Council corporate booking system is in the early stages of implementation with the
functionality for community hubs to be tested within the current phase. Hub booking
processes have been one of the most challenging aspects of advancing the hub model
with legacy systems being phased out with no replacement and required workarounds
and manual processes being put in place by all teams as we transition towards the
new corporate solution. We continue to work closely with Community Facilities, to find
improved and responsive solutions for self-managing bookings. In the interim the
coordinators have created a calendar of all current bookings and block bookings for
their hubs as illustrated in Appendix 4. 
2.47 Online presence of the hubs on the Council’s website and maximising use of the
MyTown social media channels will be taken forward in Q2 and Q3 2025/36 linking into
a wider channel review by the Communications team. Digital Community Hub
newsletters have been created as shown in Appendix 13 and 14 to connect people
and community organisations, share information about activities and promote
upcoming events, with paper versions available in the hubs and as requested.
Page 66 of 174

Page 67

Printing and public wifi 
2.48 Public WIFI is now available in all community hubs, issues over connectivity reliability
is being addressed by the digital team. Ethernet cables have also been supplied to
improve connectivity when required to the Council network for staff. Printing facilities
across all hubs was introduced from 19 April 2025 as part of the uniflow rollout with
access for non-Council staff and partners as the next phase. 
Defibrillator installation 
2.49 HSE outlines that to comply with the Health and Safety (First Aid) Regulations 1981,
employers are not required to install a defibrillator (except for schools that are now
required by the Department of Education to have at least one AED on the premises).
As part of good practice, and with the consideration of increasing footfall at the hubs
and that sports clubs are regularly using the hub facilities for physical activity, work is
being undertaken to install a defibrillator at the Newmains & St Brigid’s community hub
in the first instance. Taking forward lessons learned it recommended that all future
hubs have this in mind. 
Active travel ‘soft’ infrastructure 
2.50 The new active travel ‘soft’ infrastructure across the hubs is now in place such as the
digital monoliths mentioned at section 2.37, active travel route information boards, bike
repair stations, cycle parking and lockable bike shelters. Work is underway to increase
use of these facilities through community engagement as well as education and
training outlined in Appendix 8. Examples of the infrastructure installed is in Appendix
15. 
Space reconfiguration and signage 
2.51 Based on customer feedback some spaces have been reconfigured to suit ways of
working. Both meeting rooms in each hub now have appropriate equipment for working
in, this includes a small desk, desk chair and ethernet cables. They also have
adjustable laptop tables for working on seated spaces. There is new artwork in spaces
removing the clinical feel and in-line with trauma informed design create space that is
calming, comfortable and soothing. We are also exploring options for adjustable
lighting. 
2.52 The conference room in Newmains & St Brigid’s has been re-designed to a ‘community
room’ to remove the corporate association and furniture changes have made the space
more flexible. The static boardroom table has been replaced with folding tables on
wheels which allows floor space to be utilised at full potential. The room also has new
artwork added to improve aesthetics. 
2.53 Signage at the hubs has been or is in the process of being enhanced to support
improved wayfinding and frosted and reflective glass manifestations have now been
added to spaces to offer greater privacy and to respond to recommendations from the
NL Disability Access Panel to improve access and wider social inclusion. 
2.54 Work has been carried out to ensure the staff & partnership zones are operating at
their full potential and is overcoming the shift in culture for staff relative to co-location
and integration. The Council code of conduct, updated in January 2025, acknowledges
our expectation of all staff to operate with professional integrity and demonstrate high
standards of personal and professional conduct while undertaking their duties and
responsibilities and therefore supports a welcoming environment for partners who have
Page 67 of 174

Page 68

a presence in the community hubs. Consideration continues to be given to staff well-
being as individuals adjust to new ways of working and sharing workspaces and hub
users are provided with access to refreshments and crockery. Enhancements will be
looked at to identified outdoor staff spaces during 2025, and in partnership with
colleagues in the restorative justice team to provide outdoor seating and furniture. 
Hub maintenance and shared responsibilities 
2.55 A review of required repairs and maintenance has recently been carried out to ensure
all hubs areas are regularly maintained and adhering to set standards. The shared
responsibility for the maintenance of areas includes upkeep of outdoor spaces (e.g.
grass cutting, weeding, pruning, maintenance of landscaped areas and general
tidiness), and the servicing of changing places rooms and staff & partnership zone
spaces. As well as the overall tidiness and upkeep of spaces in line with our investment
in trauma design. A budget of shared contributions has been put in place to ensure
necessary work is carried out and the burden does not fall with education
establishments located in the hubs.  A RACI template has been developed to
strengthen the handover process linked to the introduction of future new build
community hubs to ensure consistency of understanding around roles and
responsibilities of everyone involved in the running of the community hubs. 
Forward plan of next steps and the risks and mitigating action for this phase 
2.56 Next steps 
1. Continued presence of Hub Coordinators at Community Boards.
2. Ongoing engagement with community planning partners, local community
organisations, community councils and wider stakeholders in partnership with the
community partnership team in line with the working with communities framework. 
3. Supporting the implementation of the community wealth building approach in
plans.
4. Partnership working with the Planning team in the Place service to share
intelligence relative to future design, planning and development of hubs linking to
the results of the Your Place Survey and joint work on asset mapping within
Transforming Places POW.
5. Following the launch of the ‘Trauma Design in the built environment toolkit’ in Q1
2025, continue to ensure that trauma design is applied to all future hubs. Annual
trauma walk throughs implemented.
6. Input to future hub design in partnership with the hub development and strategy
team and appointed architectural design teams, as well as presence at the Town
and Community Hub steering group. With formal lessons learned being shared
with the hub design and strategy teams.
7. Scenario planning for future hubs with services based on their One Workforce
plans and strategic workforce planning, progressing their indication of which teams
and staff can operate from hubs in the future as the model scales. 
8. As part of the scenario planning there will be a further and wider data analysis
exercise on customer demand on Council services and community use/letting of
spaces across assets as we seek to promote an asset-based community
development approach. This analysis will enable an up-to-date understanding
around main areas of enquiry and demand as well as who is using our assets, for
what and when to aid future planning.  
9. Ongoing implementation of the single telephony solution, which is critical to the
front end of the operating model in terms of both improving the customer
experience and providing intelligence on what and who is accessing support and
services and building our internal capacity to work in new and more efficient digital
Page 68 of 174

Page 69

ways to respond to customer demand. The telephony solution is equally important
to get it right for people who may present at the hub for a gateway to other supports
and services.
10. Participation in the Digital NL POW ‘Improving the Customer Experience’ group to
link dependencies and particularly in the areas of digital inclusion, front end
customer experience and trauma informed organisation.
11. Continue to strengthen linkages with the Transforming Places POW, the Open
Space Strategy and the Local Development Plan 2 (NLLDP2) including bringing
together consultative and participatory feedback across communities as we seek
to improve planning, design and development relative to our investment
programme and more closely connect the work of the operating model transition
as we shape places to improve health equity and outcomes.
12. Ongoing planning through the hub delivery groups with performance frameworks
developed linking to the benefits realisation framework as plans continue to
develop. 
Risks and mitigating actions 
2.57 
Risk Status Mitigating action
1) Ability to enhance
customer experience
through the approved
implementation of a
Corporate Booking
System with the
community facilities team
at the pace needed to
maximise use of hubs.
This affects the front-end
experience for bookers
(tied to work to enhance
the Council website
content/pages in the One
Service POW) and the
back-end reporting
functionality. Not having
effective systems is
causing strain on all teams
with workarounds having
to be put in place,
potential duplication in
effort and reliance on
manual processes that
conflict with our DigitalNL
ambitions. 
2) Customer experience
also includes the reliability
of public Wi-Fi connectivity
and implementation of
printing facilities for
external partners 
Due to slippage
around proof of
concept for hubs
as part of the
corporate
booking system
implementation. 
Promotion of
public Wi-Fi
availability does
not match with
user experience
at present, with
partners/external
• Digital and ACC agreement to fund
and dedicate project resource at the
front end of the PoC to support
community facilities team and OMDT. 
• OMDT allocated lead within the team
to prioritise attention to this.
• Approved as a shared deliverable in
the plan for NL POW between
Community Operations and Strategy
and Engagement functions with the
PoC dependent upon community
facilities adopting the new system
successfully for both front end and
back-end functionality.
• Data cleansing and analysis carried
out by the OMDT using spreadsheet
data provided by Community
Facilities in the interim until skills are
developed in the team and the
system is implemented with required
reporting to maintain a data led
approach to future plans.
• Active involvement as part of the
digital NL POW and improving the
customer experience group 
• Wider digital requirements have been
identified for hubs and OMDT are
working with digital teams to prioritise
the hubs in delivery plans and
implementation of digital
infrastructure
Page 69 of 174

Page 70

organisations
and individuals
working off
hotspots 
• Issues are being raised quickly
through tickets by the hub
coordinators and being pursued or
escalated with colleagues to find
solutions
• Investigation with provider over
performance quality
Hubs and their offer
having a consistent online
presence, and multi-
channel communications
available 
• Work underway to build an online
presence for hubs and maximise
MyTown channels to promote activity
• Creative imagery to support hub
promotion and participation in
development
• Digital screen installation at hubs to
enhance customer experience and
signposting
Ability to be demand
responsive to community
needs whilst maintaining
required governance
requirements 
• Operating model delivery manager
working effectively across plan for NL
POW boards and with officers
• Employment of hub coordinators and
success of partnership relationships
developed evidenced through their
hub delivery and in partnership with
other Council officers across POW
deliverables
• Hub delivery groups as a vehicle for
participants to strengthen networks
• Hub coordinators knowledge of local
area and network, leveraging
community resources where possible
incl. grant funded organisations and
leveraging available funding through
the boards
• Working with the community
partnership team through the working
with communities’ approaches.  
Ensuring lessons learned
are carried forward into
future hub projects and
action is not limited by
financial constraints. 
• Hub steering group as a vehicle to
share learnings and build learnings
requirements into tender process and
budget allowances
• Ongoing liaison with hub strategy
and development team, as well as
corporate repairs and maintenance,
property teams
Hub maintenance, hub
handover processes to be
improved to ensure
consistent clarity around
some of the operational
maintenance aspects. 
• Steps have been taken to provide a
maintenance schedule for hubs to
ensure shared responsibility in line
with facilities RACI matrix. The
OMDT will ensure processes are in
place as necessary which has so far
included, changing places
maintenance and outdoor spaces
out-with school and facility remit. 
Page 70 of 174

Page 71

Hub maintenance relative
to the areas within the
schools that offer space
for an increased provision
at seasonal times and
holidays tend to be closed
for maintenance work. 
• Hub Coordinators to be part of future
handover and decant meetings.
• Lessons learned completed for each
hub and communicated with Hub
Development and Hub Strategy
Teams. 
• Hub coordinator is aware of planned
works schedules with corporate
repairs and facilities teams to look at
alternative provision of spaces where
needed.
Resource capacity to
enable future planning
including analyst support
for scenario planning for
future hubs. 
• Look across the strategy and
engagement team as it reshapes to
identify support, as well as leverage
other analytical skills within the wider
hub team.
One service approach –
All council services,
commissioned partners
and community groups
effectively using the space
alongside education. 
• Progress has been made with key
Council services and partners to
leverage the hubs for service
delivery. This is supported by the
plan for NL POW governance
structure. 
• Ensuring the integration of partners
within the hubs is working effectively
alongside education service delivery.
Engagement with education staff,
HT’s, EFM’s and COs ongoing. 
• There is a calendar of services,
partners and third sector
organisations using the hubs
regularly with an increase in
community activity and partnership
projects alongside education as
alternative curriculum choices. 
Potential tension with
community councils and
organisations who operate
in the local area from
other assets and
perceived threat of hubs to
their delivery model. 
• Hub Coordinator continued presence
at community boards and building
relationships with organisations in
their areas in support of asset-based
community development.  
• Community organisations visiting the
Hubs and meeting the coordinators
exploring opportunities to work
together given we serve the same
people across our communities and
aspire to leverage all resources
available through collaboration.  
3. Measures of success 
3.1  Several measures are outlined in the project brief against the three phases of delivery
to show how we are delivering for communities through improved outcomes and
Page 71 of 174

Page 72

support the management of risk/mitigate impacts of adverse events. Each hub will in
the coming months develop its own impact framework through the hub delivery board
given the local context and blend of integrated service provision, wider governance
considerations.   
3.2 Measures 1-7 are in process with evidence gathered corporately or by specific teams,
such as those described in section 2.15 and 2.16 of the report. Measures 8, 9 will be
supported by the new visitor management processes and service data in line with their
own plans, 10 to 13 are medium to longer term as the hub model develops. 
What  How S/M/L term
1 Occupancy and usage
of hub spaces
• Activity Analysis reporting
• Quantifiable income
generation from Community
Facilities and ACC services
Short term 
2 Hub usage data and
user feedback
• Activity analysis of spaces
• Qualitative feedback from
people received through
statutory and non-statutory
service providers, case
studies and testimonials. 
• Customer experience survey
Short term
3 Level of integrated
working/partnerships
evidenced in hub
delivery plan
• No. of organisations using
hub spaces
• Evidence of joined work on
supports, activities and
programmes
• Range of services co-
located and working together
in hub timetable
Short to
medium term
4 Social media reach/user
feedback
• Social media data from
comms team once channels
are leveraged and web
pages completed/increased
use of MyTown pages.
• Case studies, testimonials
and direct feedback from
statutory and non-statutory
services, organisations using
hubs. 
• Customer experience survey
Short to
medium term
5 Access and
engagement by target
groups
• Uptake of support, activities
or services. Council
functions and other
organisations collect and
report their own data to be
fed into hub performance
outcome framework (in
development).
• Qualitative feedback from
testimonials and case
studies
Medium term
6 No. of contacts/people
supported relative to
• Uptake of support, activities
or services. Council
Medium term
Page 72 of 174

Page 73

general advice, financial
inclusion/debt money
advice,
literacy/language
skills/qualifications,
employability, digital
inclusion etc. 
functions and other
organisations collect and
report their own data to be
fed into hub performance
outcome framework (in
development).
• Qualitative feedback from
testimonials and case
studies
7 Reduction in demand
for additional/intensive
statutory services 
• Uptake of support, activities
or services. Council
functions and other
organisations collect and
report their own data to be
fed into hub performance
outcome framework (in
development).
• Reduction in referrals to
additional/intensive services 
• Qualitative feedback from
testimonials and case
studies (in development with
early positive visibility of
reduction in escalation to
SW)
Medium term
8 Number of people
accessing assisted self-
service in the hubs 
• Visitor management and
onsite informal tracking of
signposting by hub
coordinators.
Medium term
9 Comparison of usage
across assets within
NLC
• Activity analysis of use of
spaces
• Visitor management system
• Information gathered by
services/organisations as to
how and what people are
accessing and where.
Medium term
10 Progress of LOIP’s and
outcomes agreed as
part of future hub
delivery plans that
contribute to the
outcomes set in the
plan for North
Lanarkshire 
• Alignment with developing
hub offer and LOIP priorities
and connections to plan for
NL health check indicators
• Connections to community
council/local orgs action
plans
Medium to long
term
11 Number of
organisations applying
for/receiving grant
funding contributing to
delivery 
• Stakeholder map of local
organisations 
• Hub coordinators mapping
with community partnership
team which are contributing
Medium to
longer term
12 Number of volunteering
or placement
• Volunteering embedded
within family support or other
services
Medium to
longer term
Page 73 of 174

Page 74

opportunities available
in hubs 
3.3   The programme overall: 
• Provide an operational focus point for other projects and programmes to realise
their financial and non-financial benefits e.g., shared asset rationalisation, service
reconfiguration, service re-design proposals for integrated provision 
4. Supporting documentation 
Appendix 1- Three approved phases of the operating model delivery plan 
Appendix 2- HUB activity analysis for each community hub
Appendix 3- From HUB objectives to plan for NL outcomes Newmains example
Appendix 4- HUB timetable showing current usage and planned events/activity
Appendix 5- Whole family support activity, case study and flash report
Appendix 6- Newmains & St Brigid’s HUB - Remote Health Monitoring Project (Phase 1)
Appendix 7- Newmains & St Brigid’s Yoga & Zumba classes
Appendix 8- Newmains & St Brigid’s and Chryston HUB’s - Active Travel projects March 25’
Appendix 9- Newmains & St Brigid’s HUB – Intergenerational digital skills project, Feb 25’
Appendix 10- Riverbank HUB – Sport and fitness activities
Appendix 11- Community consultation survey
Appendix 12- Customer experience survey
Appendix 13- Newmains Community Hub newsletter May 25
Appendix 14-  Chryston Community Hub newsletter May 25
Appendix 15- Examples of the digital information screens, Active travel infrastructure and outdoor
gym equipment installed at HUB’s 
Name Stephen Penman
Title Chief Officer, (Strategy and Engagement) 
Page 74 of 174

Page 75

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The implementation of town and community hubs and ambitions to reduce the
inequalities caused by socio economic disadvantage align with the requirements of
the Fairer Scotland Duty. 
The EQIA for phase 2 has been completed and EQIA’s are completed for required
projects and in partnership with services. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The strategic capital investment programme allocation is a key factor in the
development of an operating model for the effective delivery of services within the
heart of communities. As members will be aware both SARIS and the delivery of new
town and community hubs both have the capacity to support these objectives. While
the development of new hubs may increase development costs marginally there are
significant benefits to be delivered in the associated rationalisation of the Council's
estate and proven operational advantages associated with the implementation of the
revised operating model of service delivery. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The impact of any workforce changes emerging during phases of the programme will
be dealt with in line with the council’s Managing Workforce Change - Framework
Guidance.  
We must ensure that any changes to approaches as our future workplace model
matures are reviewed and supported by policies and guidance. Full engagement with
Trade Unions will be taken forward as required. 
Safety and wellbeing implications around access, safety and security and also
safeguarding. Safety and security guidance is continually updated and made
available on the future workplace section of myNL. The safety and wellbeing team
will continue to work with local teams to advise appropriate measures are in place at
Page 75 of 174

Page 76

a local level around safety, security, fire safety and first aid. Communications and
engagement with management teams of key workforce groups will also take place
as appropriate, and toolbox talks encouraged with staff as necessary. Furthermore,
the approach taken is intended to have a positive impact on mental health and
wellbeing and TU’s will be engaged as appropriate through existing channels. The
safety and wellbeing team are engaged on the POW steering group and continue to
advise and guide through phases. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Extending our use of hub spaces to public sector partners in phase 2 required a
Memorandum of Understanding to be in place to support objectives of this
agreement and to ensure consideration towards insurance liabilities and statutory
requirements around safeguarding. This was supported by legal colleagues who will
continue to be engaged through delivery phases – particularly relative to the impacts
of public sector reform.
. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☒ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☒ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
There is a specific set of digital requirements if the operating model is to achieve its
ambitions. A number of these are already in place and need to be maintained or are
in development.  There is currently work to pull together emerging requirements and
detailed work with the business and digital team on this additional capability and
digital infrastructure will be required in support of the model – plans for this are
underway and the appropriate governance structures will be applied. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
Page 76 of 174

Page 77

5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Enabling staff to work locally has a positive impact on the environment and an
individual’s carbon footprint around commuting, as well as potential positive health
impacts by enabling greater choice and flexibility to how people work. The shift side
to that is the utility use/office energy consumption through a work local approach
(although within the wider context of shared assets, asset rationalisation and
investment in more energy efficient buildings and hubs positive benefits should be
realised over time) 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
There is significant impact around communication and engagement with
communities and with staff – the programme continually has a requirement to align
with the emerging direction of our approaches and the ‘Working with Communities
framework’.  Communication and engagement plans are developed throughout each
stage of the POW and colleagues from Strategy and Engagement and the
Community partnership team continue to be involved throughout phases of delivery. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The project risks are captured in the project risk register and managed through the
programme and projects. The main risks and mitigating actions are described in
section 2.57 with a broad summary for the longer-term programme below:
• Finance – delivery of strategic capital investment programme and ongoing
review of priorities, risk to savings not being realised through service
redesign to transition towards a new operating model. Further opportunity in
this phase for financial modelling as hubs work to realise the investment of
£66.9m and forward investment.
• Digital – ability to meet the infrastructure and technical support needs either
through lack of resources, lack of funds, or alignment of pace
• Political unknowns – implications of savings decisions and public sector
reform
• People – challenge of culture change relative to co-location and integrated
working to underpin the success of the model
• Communities – ensuring full participation from communities, sharing of
insights and intelligence in support of the model and realising the ambition
of the Community Boards and working with communities framework. 
5.10 Armed Forces Covenant Duty
Page 77 of 174

Page 78

Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other residents in the provision of public services. 
• Our approach to participation planning to ensure that all residents with lived
experience are included in co-design/co-creation of services, and we engage
with relevant organisations
• Completion of the EQIA 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
Approach to whole family support outlined in the report. 
An overarching CRWIA has been completed as part of the preparation for the new
Children’s Services Plan 23-26.  The Children’s Services Plan 23-26 includes
priorities and actions on how the Children’s Services Partnership will further
children’s rights and UNCRC in NL. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☒ No ☐ 
Page 78 of 174

Page 79

Appendix 1 – Three approved phases of the operating model delivery plan 
Provide shared hub
workspaces across
communities for our agile
staff in support of our
future workplace
ambitions.
Extend the hub facilities to the wider
workforce, partners, 3rd sector and wider
public sector services to enable greater
integrated working and reach into our
communities.
A fully integrated town and
community hub model
Phase 1
2 years
2021-2023
Phase 2
3-5 years
2023-2028
Phase 3
5-10 years
2028-2038
• Welcoming, safe & flexible spaces
• Recovery of peer-to-peer support
post pandemic
• Building connections and networks
to strengthen integrated working
• Buildstronger partnerships and capacity
• Greater focus on community engagement and
participation to inform core components of the
hub offer
• Test a new approach through the new build
Community Hubs- pathfinding
• Embed localised supports and services with a
focusonearlyandinclusivefamily support
• Support Council servicetransitionandre-design
• See activitiesdelivered by range of partnersand
third sectororganisationsin a more cohesive way
with the HUBs acting as a vehicle to reach
communities
• Deepened understanding of needs at a
local / neighbourhood level
• Delivering positive outcomes against the
LOIP’s
• Connecting organisations and community
groups and developing capacity and
resilience
• Responding to emerging needs through
local-led partnership working, shared
resources, skills and knowledge
Developing the operating model through phases
We’re here
Page 79 of 174

Page 80

Appendix 2 – HUB activity analysis (1) - Newmains & St Brigid’s: August 2023-March 2024 and April 2024-March 2025 
122
179
194
67
146 150
173
102
58
76
117
88
120
99
39
112
192
250
189
124
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
August 2023 - March 2024 Hub Bookings April 2024 - March 2025 Bookings
Table 1
9 10 10
122
706
4
1505
107 124
0
200
400
600
800
1000
1200
1400
1600
Table 4
3%
16%
1%
10%
7%
7%
4%
51%
1%
Changing Rooms Conference Room Drama Box Gym Hall Meeting Room A
Meeting Room B Multipurpose Room Outdoor Pitches Social Area
48
244
12
173
141
133
70
624
19
28
172
17
80
38
34
39
711
14
0 100 200 300 400 500 600 700 800
Changing Rooms
Conference Room
Drama Box
Gym Hall
Meeting Room A
Meeting Room B
Multipurpose Room
Outdoor Pitches
Social Area
August 23 - March 24 April 24 - March 25
Table 2
Table 3
Page 80 of 174

Page 81

Appendix 2 – HUB activity analysis (2) continued - Newmains & St Brigid’s: August 2023-March 2024 and April 2024-March 2025 
Usage data has been provided by community facilities and starts from August 2023 as it was when the hubs were set-up on the facilities booking system. Periods of
use are split in line with the financial year. 
• Year one runs August 2023 – March 2024. 
• Year two runs from April 2024 – March 2025. 
This data does not capture overall footfall and occupancy of spaces, but Hub coordinators have implemented visitor management processes to track this information
more effectively beginning April 2025.
• A total of 2,597 bookings have been made in the Newmains & St Brigid’s hub through community facilities.
• 1,133 between August 24 – March 24
• 1,464 between April 24 – March 25 
Table 1 on the previous page. shows a comparison of monthly bookings year on year. 
Data demonstrates a 26% average increase in bookings in year 2, from previous period August – December 2023. However, bookings between January 2025 –
March 2025 of year 2, decreased an average of 50% compared with the previous period in year 1. 
No comparative monthly data is available yet for April 2025 – July 2025. However, in April 2024 – July 2024 the trend highlights a decrease in bookings over the
holiday periods of Easter and summer holidays. 
Table 2. provides a year-on-year comparison of areas booked. Interestingly the only spaces with more bookings in year 1 was the outdoor pitches and drama box. In
all other hub spaces, there was an average increase in year 2 of 129% across all the bookable spaces. 
Breakdown: 
• Social area > 35% 
• Multi-purpose room > 80%
• Meeting Room A >270%
• Meeting Room B > 290%
• Gym Hall > 116% 
• Conference Room > 42% 
• Changing Rooms > 71% 
This trend shows a positive increased use of community hub bookable spaces beyond the outdoor pitches. 
Table 3. provides a % breakdown of all hub areas used to date. (August 2023 – March 2025) It makes clear that the outdoors pitches are the most used spaces with
over half of all historical bookings in this area. 
Table 4. Supports table 3 data. By providing a breakdown of themed activities within the hub we can see that Sports & Fitness activity is the most recurring use of hub
activity. NLC services are primarily made up of education bookings from staff within the schools in the hub.  
Page 81 of 174

Page 82

Appendix 2 – Hub Activity Analysis (2) Riverbank: September 2023-March 2024 and April 2024-March 2025
38
58
17
0
144
5
1
128
765
128
16
207
54
3
234
68
40
55
1693
206
0 200 400 600 800 1000 1200 1400 1600 1800
Changing Rooms
Community Room
Conference Room
Drama Box
Gym Hall
Meeting Room 1
Meeting Room 2
Multipurpose Room
Outdoor Pitches
Social Area
Area bookings yearly comparison
Apr 2024 - Mar 2025 Sep 2023 - Mar 2024
1%
7%
2% 0%
10%
2% 1%
5%
64%
8%
% of space usage Sep 2023 - Mar 2025
Changing Rooms Community Room Conference Room Drama Box Gym Hall
Meeting Room 1 Meeting Room 2 Multipurpose Room Outdoor Pitches Social Area
738
4 136 11
365
11
2515
72 2
0
500
1000
1500
2000
2500
3000
Themed areas of activity Sep 2023 - Mar 2025
173
233 241
128
161
211
131
226
277 275
193
208 212
121
199
219
244 248
154
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Monthly usage comparison year on year
Sep 2023 - Mar 2024 Hub Bookings Apr 2024 - Mar 2025 Hub Bookings
Page 82 of 174

Page 83

Appendix 2 – Hub Activity analysis (2) continued – Riverbank: September 2023-March 2024 and April 2024-March 2025 
The data in the graphs above reflect the comparison in hub usage at Riverbank Community Hub between the periods of when the hub opened in August
2023 up until March 2025 (NOTE: hub bookings commenced in September 2023).
• The most used space within Riverbank Community Hub is the 4G Football pitch which has been booked out 1693 times in 2024/25 in comparison
to 765 times in 2023/24 an increase of 121%.
• The biggest increase of indoor usage can be seen in the Community Room. This has risen from 58 bookings in 2023/24 to 207 bookings in
2024/25 an increase of 257%.
• The highest percentage of usage across both periods is the Gym Hall within the hub. This has 10% of the hub bookings across all the areas on
offer.
• For 7 year on year comparable months of facility usage at Riverbank Community Hub between the periods 2023/24 and 2024/25 (Jan, Feb, Mar,
Sep, Oct, Nov, Dec), monthly bookings have increased at the hub for those months.
• Since the opening of the hub; the hub has mostly been used for Sport & Fitness bookings, predominately from the football pitch. Childcare and
NLC services are also very prominent within Riverbank Community Hub with the deliberate focus on operationalising whole family support.
Areas identified from the analysis for growth and opportunity
• In both the months of July and December there is a drop in hub bookings, this is due to school holiday periods when there is less footfall in and
around the hub and local community. This is an opportunity to work with local services and groups to encourage them that the hub is still available
for use at these times.
• While there is an increase in Meeting Room (MR) bookings (MR 1 - 5 bookings 2023/24, compared to 68 bookings 2024/25 and in MR 2 – 1
booking 2023/24 compared to 40 in 2024/25) we expect to see growth of usage following reconfiguration of the rooms that have incorporated a
workstation based on user feedback.
• Ongoing work with various partners and services and developments in the pipeline should see a positive effect on bookings through community
activity, learning & employability and youth work and organisations. 
Page 83 of 174

Page 84

Appendix 2 – HUB activity analysis (3) - Chryston Community HUB January 2024-March 2024 and April 2024-March 2025  
Page 84 of 174

Page 85

Appendix 2 – HUB activity analysis (3) continued - Chryston Community HUB January 2024-March 2024 and April 2024-March 2025
The data in the graphs attached reflect the comparison in Hub usage at Chryston Community Hub between the periods January 2024 (when Hub usage
began to be recorded), until March 2025.
• Since Hub usage was first recorded in January 2024 at Chryston Community Hub, Hub usage figures have been inconsistent e.g. Jan, Feb and July
2024 combined (July being a school holiday period) saw <5 bookings across the whole Hub. Whereas March/April saw 60+ bookings and Sep/Oct 50+
bookings.
• March 2025 has seen the highest booking usage since the Hub opened, with 59 bookings confirmed over the month. This shows an increase
compared to March 2024 of 168%.
• The most used 3 spaces within Chryston Community Hub are the Gym Hall, Meeting room 1 and the Conference room (with the meeting rooms and
conference rooms shared with NHS colleagues).
• Overall, Hub usage during Jan/Feb/March 2024 consisted of 25 bookings. Over the same 3 months in 2025 this has increase to 118 bookings; an
increase over the 2 periods of 372%.
• Since the opening of the Hub, bookings have predominately been made for NLC service delivery purposes, with sport and fitness, support groups and
youth work also significant. 
Areas from the analysis identified for growth and opportunity
During the months of July and December 2024, there is a significant drop in Hub bookings. This is due to school holiday periods when there is less footfall in
and around the Hub. There have been indications from the Hub Facilities Management (FM) team that this may be due to a variety of factors e.g. FM have
until now recruited staff for ‘term time’ only. School holidays are also when facilities teams try and take much of their annual leave. Now that the Hub
Coordinator is in place this can be addressed and a new focus on maximising occupancy of the the spaces when the school population is not using the hub
can take place.
• There is potential growth of usage opportunities through improvement of facilities on offer e.g. improved wifi connection, printing availability. There is
also work ongoing by the CHC to improve booking processes and in some cases the reconfiguration of rooms to incorporate an improved workstation
for users.
• Work is ongoing with various partners and services which will see a positive impact on bookings, through the development of statutory and non-
statutory partnerships and activity, Learning & Employability, Youth Work, supporting various aspects of health and wellbeing and addressing health
inequalities.  
Page 85 of 174

Page 86

Appendix 3 – Hub delivery plan for Newmains & St Brigid’s from objectives to plan for NL outcomes
NOTE: The rainbow effect illustrates where objectives or plans cut across plan for NL health check indicators, each delivery board is developing its own performance outcomes in line with the benefits realisation guidance. 
Page 86 of 174

Page 87

Appendix 4 – HUB timetable showing current usage and planned events/activity @ May 2025 
Monday Tuesday Wednesday Thursday Friday Saturday Sunday
Newmains & St
Brigid's
St Aidan's Cluster Meetings 9am - 10.30am (Meeting
Room B)
Tackling Poverty Team weekly clinic to support booked
appointments 9am - 5pm (Meeting Room A) and 1pm -
5pm (Meeting Room B)
NL Carers Together Neurodevelopmental Family
Support 11am - 12.30pm (Meeting Room B)
School Headteachers 3pm-4pm (Meeting Room B)
Phoenix Futures family support weekly clinic pre-
booked appointments 12pm - 2pm (Conference Room)
Football Groups 6pm - 9pm (3G Pitches - Full)
School Headteachers 9am - 10am (Meeting Room A)
NHS OT 'Mental Health Team' 9am-4pm (Meeting Room
A +B)
NHS Psychological Service for Old People 2pm - 4.30pm
(Meeting Room B)
Teen Talk counselling services 9am -12pm (Meeting
Room A)
Families here and now service 11am - 2pm (Meeting
Room B)
NHS Psychological Services (Veterans support service
team weekly team meeting) 2.30pm - 4.30pm
(Conference Room)
Football Groups 6pm - 9pm (3G Pitches - Full)
School Headteachers 9am - 10am (Meeting Room A)
Routes to Work 11am - 4pm (Meeting Room B)
NHS Physio Research Project 11am - 2pm (Meeting Room
A)
CLD Children & Families 12pm - 3.30pm (Conference
Room)
NHS Integrated Day Service Team Meetings 2pm - 4pm
(Conference Room) *School holidays
ActiveNL Zumba 7-8pm (Gym Hall)
AA Support Group 7pm -10pm (Multi-purpose Room)
Football Groups 6pm - 9pm (3G Pitches - Full)
School Headteachers 9am - 10am (Meeting Room A)
St Aidan's Cluster Meetings 1:1 meetings 1pm - 3pm (Meeting Room
A)
Wishaw Housing weekly team meeting 10am - 12pm (Conference
Room)
Families Here and Now Service 12pm - 2pm (Conference Room)
Education & Families Kinship Team 10am - 12.15pm (Meeting Room
A)
Brannock High Language Therapy 1.20pm - 3.30pm (Meeting Room
B)
NHS OT Rhuematology Team - Fatigue Management Group 12.30pm
- 4pm (Conference Room)
NL Disability Forum 9am - 12pm (Meeting Room B)
School HT's 3pm-4pm (Meeting Room B)
ActviveNL Body Attack 6.15-7.15pm (Gym Hall)
ActiveNL Yoga 7.15-8.15pm (Gym Hall)
CLD Girls Group 6pm-8pm (Social Area)
Football Groups 6pm - 9pm (3G Pitches - Full)
School Headteachers 9am - 10am (Meeting Room A)
Phoenix Futures family support weekly clinic 10am -
2pm (Meeting Room A)
NL Carers Together weekly clinic 10am - 4pm (Meeting
Room B)
Families here and now service 2pm - 4pm (Conference
Room)
Kinship Carers weekly peer-support group 9.30am -
12.30pm (Conference Room)
Football Groups 6pm - 9pm (3G Pitches - Full)
Football Pitches 12pm -
3pm (3G Pitches Full)
Families here and now
service community
room (10am to 3pm)
Football Pitches 12pm -
4pm
Riverbank NL Carers Together 8.30am-5pm (Meeting Room 1)
School Headteacher 9am-10am (Meeting Room 2)
CLD 12pm-1pm (Conference Room)
Solihull Parenting Group 1pm-4pm (Term time -
Community Room)
C&S Out of Shool Care 3pm-6pm (Social
Area/Multipurpose Room)
School HT 2.30pm-3.30pm (Meeting Room 2)
School HT 4pm-5pm (Community Room)
CLD 9am to 12noon (Staff/partnership zone)
Bushido Karate 6pm-7pm (Gym Hall)
Football Groups 6pm - 9pm (Football Pitches in use
except pitch 2 between 8pm-9pm)
School Headteacher 9am-10am (Meeting Room 2)
Carers Together ASN parent peer support group 9.30am-
11.30am (Community Room)
NL Disability Forum 9am-12pm tbc (Meeting Room 1)
School HT 2.30pm-3.30pm (Meeting Room 2)
C&S Out of Shool Care 3pm-6pm (Social
Area/Multipurpose Room)
NLC Active Schools 9am to 12noon (Staff/partnership
zone)
Football Groups 6pm - 9pm (Football Pitches - full
usage)
School Headteacher 9am-10am (Meeting Room 2)
Tackling Poverty drop ins 9am-5pm (Meeting Room 1)
School HT 2.30pm-3.30pm (Meeting Room 2)
C&S Out of Shool Care 3pm-6pm (Social Area/Multipurpose
Room)
Sense of Wonder 6pm-7pm (Community Room)
VANL 2pm-5pm (Staff/partnership zone)
Football Groups 6pm - 9pm (Football Pitches - full usage)
NHS Perinatal Mental Health  'FInding me' Group for new
parents with babies up to 1-year old 10am-12noon
(Community room from Wed 20th August)
NHS psychological services stress management workshops
- during Summer Holidays (Community room)
School Headteacher 9am-10am (Meeting Room 2)
Tackling Poverty Team 3 in 4 base and booked appts with Routes to
Work (Meeting room 2 - 10am to 2pm)
Housing tenant participation 10am-2pm (Staff/Partnership zone)
School HT 2.30pm-3.30pm (Meeting Room 2)
C&S Out of Shool Care 3pm-6pm (Social area/multipurpose room)
Football Groups 6pm - 9pm (Football Pitches in use except pitch 2
between 8pm-9pm)
School Headteacher 9am-10am (Meeting Room 2)
NLC Cluster work 10am to 2pm (Meeting room 2 &
staff/paternship zone)
Families here and now service drop in 2pm-4pm
(Meeting Room 1) (Staff/partnership zone)
School HT 2.30pm-3.30pm (Meeting Room 2)
C&S Out of Shool Care 3pm-6pm (Social
Area/Multipurpose Room)
Football Groups 6pm - 9pm (Football Pitches - full
usage)
NHS Perinatal Mental Health 'Circle of Security' peer
support new parent group 10am-12noon (Community
room from 3rd October 2025)
Football Pitches 9am -
3pm (Football Pitches -
full usage)
Families here and now
service community
room (10am to 3pm)
ASN Stars Football NL
(930-230pm Gym Hall)
Football Pitches 9am -
3pm (Football Pitches -
full usage)
ASN Stars Football NL
(930-230pm Gym Hall)
School Headteacher (meeting room 1,  3pm - 4pm)
Teen Talk counselling services (Meeting Room 2,  3-
4pm) 
Chryston Community Council, Conference Room, last
monday of every month 6-9pm                                                       
Sparkles Dance Academy, Gym, 5pm - 7.30pm   
Routes to work supported by Tackling Poverty Team 
(meeting room 2 -  9am-4pm)  
SAMH well informed mental health drop in from 17th
June (meeting room 1 10am-2pm)
Advance dance Academy, Gym, 5pm - 9pm
Carers together 930am - 430pm (Meeting Room 1)                               
School Headteacher meeting room 2, 1pm-330pm                                              
Facilities management team meeting, Conference room
1pm - 3pm
ActiveNL Slim Start weight management class from 11th
June 530pm-630pm
Community Policy Drop in on 28th May (530-7pm
Conference Room)
Barnardo's nurture support (meeting room 1 all day)
School Headteacher (meeting room 2 12 noon - 2pm)                                
Cluster work Donna McCann meeting Conference Room, 1pm - 4pm
Teen Talk counselling services (Meeting room 2, 330-4.30pm) 
2nd Clyde Scout Group, gym hall, 5pm - 7pm      
Tackling poverty (meeting room 1, 9am-4pm)
Cluster work Donna McCann meeting Conference
Room, 9am - 12 noon
Community Health Walk and social 930-1230
Families Here and Now Service (meeting room 2 11am-
2pm)
NL Disability Forum providing an Improving the Cancer
Journey service - meeting room 2 (2pm-4pm)
Families Here and Now service (Conference Room
230pm-430pm)
Families here and now
service community
room (11am to 3pm)
monthly
Appointments based on a scheduled programme/self
referrals for addiction and rehab services,
anticoagulant, CAMHS Neuro, child immunisation,
midwifery, phlebotomy, physio, podiatry, psychological
therapy, speech and language therapy
Appointments based on a scheduled programme/self
referrals for addiction and rehab services, anticoagulant,
CAMHS Neuro, child immunisation, midwifery,
phlebotomy, physio, podiatry, psychological therapy,
speech and language therapy
Appointments based on a scheduled programme/self
referrals for addiction and rehab services, anticoagulant,
CAMHS Neuro, child immunisation, midwifery, phlebotomy,
physio, podiatry, psychological therapy, speech and
language therapy
Appointments based on a scheduled programme/self referrals for
addiction and rehab services, anticoagulant, CAMHS Neuro, child
immunisation, midwifery, phlebotomy, physio, podiatry,
psychological therapy, speech and language therapy
Appointments based on a scheduled programme/self
referrals for addiction and rehab services, anticoagulant,
CAMHS Neuro, child immunisation, midwifery,
phlebotomy, physio, podiatry, psychological therapy,
speech and language therapy
C Card 830am to 445pm C Card 830am to 445pm
Sexual Health Clinic 1pm-4pm appt only
Young people clinic drop in or walk in 4pm-6pm
registration 4-5pm
C Card 830am to 445pm C Card 830am to 445pm C Card 830am to 415pm
Colour legend= Community Organisations Council / Partner NHS services
Chryston
Page 87 of 174

Page 88

Appendix 4 continued - HUB timetable showing current usage and planned events/activity 
Newmains & St Brigid's Riverbank Chryston
Barnardos
Saturday 24th May 11am -3pm (Multipurpose Room)
Summer HUB showcase event - August 2025
Organised with Hub Delivery Board
UH&SCP NL Senior Management Team Meeting
6th Aug 2025 1pm - 3pm - Conference Room
Carers Together : Tuesday 8th July Training Day 9am -
5pm (Community Room) Tuesday 2nd September
Meeting 9am - 5pm (Community Room) Tuesday 2nd
December Dev Day 9am-5pm (Conference Room)
Carers Together: Tuesday 7th October Staff
Training 9am - 1pm (Community Room)
Community Police use of meeting rooms
periodically to hold community drop-in sessions.
Wishaw & Shotts LOIP Group (Mental Health)
Wednesday 23rd July 11.30-1.30pm (Multi-purpose
Room)
NHS Smoking Cessation - in planning- DTBC Tackling poverty Team financial education
sessions planned for Conference Space during
2025
NHS Speech & Language Friday 13th of June 9am - 6pm
(Community Room)
Housing Locality services - in planning SAMH drop in mental health support day/booked
appointments - starts from 17th June
Supported Employment Training Days (Whole day)
03/07/2025 (Meeting Room A)
10/07/2025 (Multi-purpose Room)
21/07/2025  (Multi-purpose Room)
ACC / CLD / NHS joint working - pre natal classes
with exercise classes for families
TARA : Annual Tenants Conference 8am - 6pm
(Whole Hub), 14/15th November.
NHS Tobacco Control Team Meetings 9.30am -
12.30pm Conference Room
2nd July
13th August
4th November
17th December
ActiveNL new fitness classes - in planning- DTBC
RunClub for 20 people using hub pathways
HiFit indoor high energy fitness class
Yoga or body balance
Walking Football Festival - In partnership with Chest,
Heart & Stroke Scotland
Monday 4th of August - 6pm - 9pm (Whole Hub)
NHS Psychological Services - Stress Management
Workshops - 6-weeks in August (Multipurpose Room)
Singing Kettle Halloween special
Saturday 18th October 9am - 4pm (Drama box and Main
Hall)
ActiveNL new fitness classes - in planning- DTBC
Yoga or body balance
HiFit/Body Attack
Slimstart weight management
Carers Together
Monday 17th November, Comitment to Carers
Conference, gym hall, 8am - 6pm and 5th Aug and
4th Nov Conference room 8.30am - 1.30pm
Page 88 of 174

Page 89

Appendix 5 – Whole family support, early and inclusive family support – Families Here and Now service FHANS 
Page 89 of 174

Page 90

Appendix 5 – Whole family support, early and inclusive family support – Families Here and Now service Case Study March 2025 
Page 90 of 174

Page 91

Appendix 6 – Newmains & St Brigid’s HUB - Remote Health Monitoring Project (Phase 1) led by UH&SCP 
Page 91 of 174

Page 92

Appendix 7 – Newmains & St Brigid’s HUB - Yoga & Zumba classes 
Page 92 of 174

Page 93

Appendix 8 – Newmains & St Brigid’s and Chryston HUB’s - Active Travel projects March 2025 
Page 93 of 174

Page 94

Appendix 9 – Newmains & St Brigid’s HUB – Intergenerational digital skills project, February-March 2025
Page 94 of 174

Page 95

Appendix 10 – Riverbank HUB – Get Walking Health Walks, Bushido Karate Club and HUB user testimonials 
Page 95 of 174

Page 96

Appendix 15 – Examples of the digital information screens, Active travel infrastructure and outdoor gym equipment installed at HUB’s 
Digital monolith Tool station
Active travel board install Outdoor gym equipment
Cycle parking and bike shelter
Digital information display screen
Scooter parking
Page 96 of 174

Page 97

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref LJ/SL Date 05/06/25 
Demonstrating Best Value in Transformation 
From  Stephen Penman, Chief Officer (Strategy and Engagement)  
E-mail PenmanSte@northlan.gov.uk Telephone 07725 289 559 
Executive Summary
Members of the Policy and Strategy Committee will recall the report in March 2025 which
provided an update in progress being made in delivering a wide range of programmes,
projects, and activities in respect of the Programme of Work for 2023 to 2028.   
The report in March 2025 followed on from many reports to the Policy and Strategy
Committee since The Plan for North Lanarkshire was established in 2019 that have
demonstrated how the vision - inclusive growth and prosperity for all to bring equal benefits
and a fairer distribution of wealth to all North Lanarkshire’s people and communities - was
being developed and delivered to transform the place that is North Lanarkshire. 
The transformation of North Lanarkshire to date has been able to be realised through
decisions made by the Policy and Strategy Committee and the council’s Committees which
have been unwavering in their support to not just deliver the Programme of Work, but to
ensure it is delivered with a greater focus on scale and purpose that escalates positive
change and transformation in a way that improves the lives of the people and communities
of North Lanarkshire.   
The duty of Best Value underpins all aspects of council activities and members of the Policy
and Strategy Committee are well versed in the duty which requires the council to ensure
arrangements are in place to secure continuous improvement in performance for all the
functions and activities undertaken to deliver services and improve outcomes. 
Since implementation of the duty in 2004, all local authorities in Scotland have been subject
to ongoing national and local audit processes to ensure they continue to be able to
demonstrate Best Value in practice.  A new national approach to auditing Best Value came
into effect as part of the external auditor five-year appointments from 2022/23 which
includes a thematic audit each year; the theme for 2025 is transformation. 
While Best Value has a focus on good governance and managing resources effectively, in
practice it is about so much more - it’s about improving the functions and activities the
council undertakes to deliver the best possible outcomes and services that improve the
everyday lives of local people.  Elected Members therefore also have a central role to play
to ensure the council continues to demonstrate Best Value in practice 
The 2025 thematic audit is currently underway across the council and, as per the Scheme
of Administration, the Policy and Strategy Committee have a clear role in this respect in
Item 4
Page 97 of 174

Page 98

1. Background 
1.1 The new national approach to auditing Best Value came into effect as part of the
external auditor appointments for the five-year term from 2022/23.  This approach is
twofold and means that: 
• Auditing Best Value is integrated within the wider scope of the external auditor’s
annual audit work which is reported in their Annual Audit Report (AAR). This
includes risk-based and follow up audit work on Best Value related
recommendations from previous audit reports as well as reflecting on council
reporting against priorities and in terms of the use of the Local Government
Benchmarking Framework (LGBF).
• Thematic Best Value audit work is undertaken each year by the external auditor as
per the Accounts Commission’s requirements to provide assurance on areas of risk
/ interest across councils as at a defined point in time, thus enabling comparisons
across Scotland.  This means that each year the council undergoes an assessment
of particular aspects of Best Value in order to provide the Accounts Commission
with the relevant assurances in terms of performance and the quality of services to
the public. 
1.2 Since the new approach was implemented, Elected Members have been able to view
the various outcome reports (listed below) through the Policy and Strategy Committee
and/or the Audit and Scrutiny Panel: 
Annual Audit Report (AAR) 
• 2022/23 - link to report to Audit and Scrutiny Panel in October 2023.
• 2023/24 - link to report to Audit and Scrutiny Panel in October 2024.
terms of overseeing the delivery of the council’s transformational and digitisation
programmes and projects.  As such, this report provides an update in respect of the
thematic audit on transformation and the context and evidence put forward by the council
to support the audit (set out in Appendix 1). 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Are aware of the update to the national approach to auditing Best Value, the theme
of transformation for the year three Best Value audit work, and the context and
evidence put forward by the council to support the audit (as set out in Appendix 1), 
(2) Continue to endorse their role (in line with the Scheme of Administration) in terms of
overseeing the delivery of the council’s transformational and digitisation programmes
and projects, and
(3) Continue to support the Programme of Work as the delivery vehicle supporting the
transformation of North Lanarkshire. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Programme of Work All Programmes of Work
Page 98 of 174

Page 99

Thematic report
• The council’s 2022/23 outcome report on the theme in respect of the leadership of
the development of new strategic priorities was presented to the Audit and Scrutiny
Panel in October 2023 and the Policy and Strategy Committee in December 2023.
• The council’s 2023/24 outcome report on the theme for workforce innovation
(specifically how the council is responding to current workforce challenges through
building capacity, increasing productivity, and innovation) was presented to the
Audit and Scrutiny Panel in August 2024 and the Policy and Strategy Committee
in September 2024. 
1.3 With the national thematic Best Value priorities changing each year, this report provides
an update for Policy and Strategy Committee on year three thematic Best Value audit
work for 2025 and, as the thematic audit is currently underway across the council, this
report provides the Policy and Strategy Committee with an update in respect of the
thematic audit on transformation and the context and evidence put forward by the
council to support the audit (set out in Appendix 1). 
2. Best Value audit approach in councils 
The duty of Best Value 
2.1 The requirements for external auditors in all areas of their audit work, including Best
Value, are set out in the Code of Audit Practice 2021.  This is issued by Audit Scotland
to define auditors’ objectives and responsibilities, and it is a condition of each auditors’
appointment that they follow the Code.  Supplementary guidance is also provided to
assist external auditors in meeting the Best Value requirements of the Code; this
promotes a consistent approach to the audit work across all 32 councils.     
2.2 Having been in place since 2004, the national Best Value guidance was updated in
2020 to better reflect the environment in which councils deliver services with an
increasing emphasis on citizens and personalised services, a focus on outcomes, and
the need for innovation in designing public services for the future.  The 2020 guidance
frames Best Value around seven areas and councils are required to demonstrate a
focus on continuous improvement in performance around each of these areas: 
1. Vision and leadership.
2. Governance and accountability.
3. Effective use of resources.
4. Partnerships and collaborative working.
5. Working with communities.
6. Sustainability.
7. Fairness and equality. 
Sustainability, and fairness and equality, continue to be cross-cutting areas that should
be integral to all of the functions and activities carried out by a council to deliver good
outcomes and achieve Best Value. 
Annual Audit Reports (AARs) 
2.3 The approach to auditing Best Value includes a regular review of Annual Audit 
Reports (AARs) by the Accounts Commission. 
• Annual Audit Reports (AARs) for each council are reviewed by the Accounts
Commission (under the cover of the statutory Controller of Audit report which is
Page 99 of 174

Page 100

produced under Section 102 of the Local Government (Scotland) Act 1973) at least
once over the five-year appointment to provide the Commission with assurance on
Best Value in each individual council.  
• The programme of Controller of Audit reports will cover all 32 councils over the
period from October 2023 to August 2027; eight councils are due to be reported
each year.
• The national timetable is as noted in the table underneath; North Lanarkshire
Council will undergo the Controller of Audit process and report to the Accounts
Commission between October 2025 and August 2026. Controller of Audit reports
scheduled over this period are subject to change, however, should another
council’s risk profile change significantly. 
Council reports published to
date
Reports due to be published by
August 2025
Reports due to be published
October 2025 to August 2026
• South Ayrshire
• Dundee City
• Dumfries and Galloway
• Orkney Islands
• Moray
• Falkirk
• Clackmannanshire
• City of Edinburgh
• Scottish Borders 
• East Renfrewshire
• Argyll and Bute
• Fife
• Highland
• Renfrewshire
• Western Isles
• East Lothian
• North Ayrshire
• Aberdeenshire
• North Lanarkshire
• Shetland Islands
• Glasgow City
• Stirling
• Inverclyde
• Angus 
Publication dates for remaining
the 8 councils to be confirmed. 
• Controller of Audit reports will cover each council’s latest Annual Audit Report
(AAR) and be a summary of the information and judgements reported.  The
Accounts Commission will consider the report and may report findings publicly or
request a hearing (in extreme circumstances).
• External auditors will undergo a clearance process with each council for the
Controller of Audit reports. Thereafter these reports will be expected to be
submitted to the relevant committee for Elected Member’s discussion and
oversight. 
National outcomes from the annual thematic Best Value audit work 
Year one - 2022/23 
2.4 Following the conclusion of the thematic Best Value audit work for 2022/23, which 
focused on the leadership of the development of new strategic priorities, a national
report (link) was published in July 2024 with key findings which included the following: 
• The leadership in all councils have established a clear vision supported by revised
priorities informed by the views of citizens and communities.  
• Most councils have set out what they want to achieve in their priority areas, but
improvements are needed in performance monitoring and reporting.  
• Councils need to do more to ensure budget decisions and financial strategies are
aligned to priorities. Councils have a variety of strategic plans focused on
workforce, digital, assets, and service plans but the extent to which these have
been updated to reflect new priorities is varied. 
• Members and officers are working collaboratively, but maintaining and
strengthening these relationships and ensuring strong governance and scrutiny is
key to ensuring tough decisions are made effectively. 
• Community empowerment is a local priority for most councils.
Page 100 of 174

Page 101

Source: Audit Scotland at an Improvement Service learning event, December 2024 
It should be noted that none of the issues noted in paragraph 2.4 above were identified
as an area for improvement within the North Lanarkshire Council thematic Best Value
report for 2022/23. The report for the council in this respect identified three areas for
improvement which have been implemented and signed off by the external auditors,
these focussed on strategic planning feedback, community engagement, and elected
members training and development. 
Year two - 2023/24 
2.5 Following the conclusion of the thematic Best Value audit work for 2023/24, which 
focused on workforce innovation, a snapshot of key findings from Audit Scotland’s
review of thematic reports for all 32 councils in Scotland is shown below. The
corresponding national report is scheduled to be published in early autumn 2025. 
• Councils take a structured and comprehensive approach to workforce planning at
service level, but the corporate-level approach requires strengthening. Councils
recognise that the need to make workforce planning more strategic.
• Workforce strategies are clearly aligned to strategic priorities.  Councils engaged
effectively with Heads of Service and Trade Unions when developing their
Workforce Strategy.
• Councils have a workforce plan to support the delivery of its strategic objectives,
but this needs to align with service plans and digital strategy.
• Work is underway to capture the skills and development needs of the workforce
and work to identify skills gaps is at an early stage.
• Councils need to develop comprehensive workforce planning across their services.
Plans should be underpinned by better data to support decision making and
measure impact. 
Source: Audit Scotland at an Improvement Service learning event, December 2024 
It should be noted that none of the issues noted in paragraph 2.5 above were identified
as an area for improvement within the North Lanarkshire Council thematic Best Value
report for 2023/24. The report for the council in this respect identified three areas for
improvement which are being progressed during 2025/26, these focussed on acting on
staff feedback, flexible and hybrid working policies, and data in respect of the temporary
workforce. 
Year three - 2024/25 
2.6 The thematic Best Value audit work for 2025 will see a focus on Transformation - how
councils are redesigning and delivering more efficient services to achieve planned
outcomes across all 32 councils in Scotland. In considering this matter, external
auditors will focus on the following questions:   
a) To what extent does the council have clear plans for transformation that link to its
priorities and support long-term financial sustainability? 
b) To what extent do the council’s programme management arrangements facilitate
effective oversight of its transformation plans? 
c) To what extent are communities and partners involved in the development and
delivery of the council’s plans for transformation? 
d) To what extent has the council considered the impact of its transformation activity,
including on vulnerable or protected groups?   
Page 101 of 174

Page 102

2.7 In providing added context in respect of the year three thematic audit, the external
auditors have also highlighted that self-evaluation and evidence should always remain
key to a council being able to demonstrate Best Value. 
2.8 To support the provision of evidence the auditors have specifically requested
information in respect of the undernoted areas of interest.  The council’s evidence in
this respect has been captured in a context document which is set out in Appendix 1 to
this report.  The content of the context document in these areas of interest is structured
around the four questions listed in paragraph 2.6 above.  This includes a wide range of
corporate and governance information, as well as programme of work specific
information which has been provided by Chief Officers in their role as Senior
Responsible Officers (SROs) for the Programme of Work priorities (i.e. Transforming
Places, Invest in North Lanarkshire, Sustainable Futures, Resilient People, Brighter
Futures, Digital North Lanarkshire, and One Service). 
Area of
interest Documents
Plans for
transformation
1.  Strategic transformation plan (where this exists).
2.  Individual transformation project plans (sample of three).
3.  Council plan.
4.  Financial plans.
Transformation
programme
management
5.  Minutes and progress reports to the senior leadership team for the
last year.
6.  Minutes and progress reports to elected members for the last year.
Community
and partner
involvement in
transformation
7.  Evidence of partner involvement in the development and delivery
of transformation projects.
8.  Evidence of joint funding arrangements between the council and
partners on transformation projects.
9.  Evidence of community involvement in the development and
delivery of transformation projects.
Impact of
transformation
10.  Equality impact assessments (sample of three).
11.  Impact reports (sample of three).
12.  Public performance reports supporting transformation plans. 
Next steps 
2.9 The Annual Audit Report (AAR) for 2024/25, and outcome report arising from the
thematic Best Value audit work to be undertaken during 2025, are expected to be
reported to the Audit and Scrutiny Panel in the autumn of 2025, and the Policy and
Strategy Committee thereafter. 
2.10 Details of the national audit work programme each year (including both completed and
still to be published work) are contained within the Audit Scotland website:
https://audit.scot/what-we-do/our-work-programme. As a dynamic work programme,
this information is kept under review and updated every three months to ensure it
responds to changing circumstances. 
2.11 National developments in terms of the approach to auditing Best Value, as well as key
findings arising from other councils’ audits, continue to be kept under review as the
process evolves to ensure the council remains aware of developments across
Scotland. 
3. Measures of success 
3.1  Measures of success include:
Page 102 of 174

Page 103

• Regular oversight and monitoring of performance across the organisation to gain
assurances in terms of governance and accountability.
• Regular review and challenge processes to scrutinise the performance of the
council to ensure effective use of resources and that resources are directed in
accordance with agreed policy and according to priorities, while ensuring sound
decision making and clear accountability for the use of resources in achieving
improved outcomes for service users and the local community.  
• Performance monitoring, management, and reporting arrangements that support
the demonstration of improved performance in local services and outcomes, and
the delivery of Best Value. 
4. Supporting documentation 
4.1 Best Value work reported in Annual Audit Reports (AARs) and local 
management reports have been collated across Scotland into national thematic and 
overview reports.  The links to these reports are available below for the supplementary 
information of Audit and Scrutiny Panel members. 
• Transformation in councils - sector led change and collaboration to achieve
financial sustainability - October 2024.  This aims to set the scene in advance of
the year three thematic Best Value audit work.
• Delivering for the future - why leadership matters (national output report following
year one Best Value thematic audit) - July 2024.
• How the Accounts Commission holds local government to account - blog January
2024.
• 20 years of Best Value Auditing in Scotland - September 2023. 
Stephen Penman
Chief Officer (Strategy and Engagement) 
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
Page 103 of 174

Page 104

5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The Local Government in Scotland Act 2003 introduced the duty of Best Value; this
requires that councils “make arrangements to secure continuous improvement in
performance”. 
The Local Government Act 1992 established the role of the Statutory Direction to
direct councils in terms of the “publication of information as to standards of
performance”.  
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact?
Page 104 of 174

Page 105

Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Ensuring that members of the Policy and Strategy Committee and Audit and
Scrutiny Panel are aware of their role, and how this supports the council to
demonstrate Best Value, contributes to the mitigation of the risk on the Corporate
Risk Register for governance, leadership, and decision making.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 105 of 174

Page 106

Appendix 1 
Demonstrating Best Value in Transformation - the North Lanarkshire context
May 2025 
A. To what extent does the council have clear plans for transformation that link to its
priorities and support long-term financial sustainability? 
1. The Plan for North Lanarkshire was established in 2019 with a very clear vision - inclusive growth
and prosperity for all - to bring equal benefits and a fairer distribution of wealth to all North
Lanarkshire’s people and communities.   
• Founded on a place-based ambition, The Plan for North Lanarkshire has at its core an ambition
to transform the physical environment of North Lanarkshire in a way that recognises the
intrinsic value - and economic, social, and health benefits - gained in doing so.
• This ambition recognises that implementing a place-based approach originates from the need
to address spatial concentrations of disadvantage which, in recent years, have become further
exacerbated by a growing complexity of problems being presented in terms of economical,
health, and social issues.  As such, a place-based approach aims to target an entire community
and tackle issues that exist at the neighbourhood level (such as employment, education, skills,
economic stability, housing, and health), and address fragmented service provision that leads
to gaps or duplication of effort. 
• Investing in a place-based approach and focusing on the physical environment of local
communities, and on better integrated and more accessible service systems therein, underpins
the holistic approach (that crosses public sectors and service silos) being delivered through
the Programme of Work.  This approach aims to make The Plan for North Lanarkshire real for
people, and North Lanarkshire a place which individuals can identify with - a place to live,
learn, work, invest, and visit. 
2. Prior to The Plan for North Lanarkshire being formally established in 2019, the shared ambition for
inclusive growth and prosperity was set out in a report approved at committee in September 2018
(link).  This shared ambition was based on evidence through an original dataset which later evolved
into the 28 health check indicators. This report outlined the future direction for North Lanarkshire to
be a place where everyone is given equality of opportunity and where individuals are supported,
encouraged, and cared for at each key stage of their life.  The Plan for North Lanarkshire is
deliberately one plan for one place as all partners from the North Lanarkshire Community Planning
Partnership endorsed this approach from the outset and signed up to the shared ambition therein
for the North Lanarkshire area. 
3. The 2018 report also outlined plans to develop a Community Investment Fund to realise new
resources for direct investment to deliver on the shared ambition. These resources would be over
and above that already approved to fund existing capital programmes and are critical to the
successful delivery of place-based ambition of The Plan for North Lanarkshire.  As such, this project
is one of the case studies submitted to the Best Value auditors as it demonstrates the fundamental
role the Community Investment Fund has played from the outset in enabling the vision in The Plan
for North Lanarkshire to become a reality in the transformation of North Lanarkshire (and it aligns
to the Accounts Commission transformation principles of vision, planning, governance,
collaboration, and innovation).  This case study is available to view in the Audit Scotland / NLC
shared evidence platform within the case study folder. 
• Since the initial plans in 2018, the Community Investment Fund has remained under review to
ensure the underpinning assumptions used in determining the potential funding available
remain up to date.  The reports in the links below also show the ongoing commitment to
securing the financial resources and maintaining the long-term financial sustainability required
to deliver on The Plan for North Lanarkshire vision.  It also shows the continued alignment to
delivering the Strategic Capital Investment Programme priorities, with the reports in September
2023 and December 2024 also demonstrating the extent of place-based and service focussed
transformational programme delivery highlights to date. Page 106 of 174

Page 107

• December 2024 - link (report shows the date as 05/12/23; but this link is the actual 05/12/24 report).
• September 2023 - link.
• September 2022 - link.
• December 2021 - link.
• March 2020 - link, December 2020 - link. 
4. Approved in March 2024, the council’s updated Capital Strategy 2024/25 to 2028/29 (link to
strategy) provides the framework to ensure the council creates an asset base that meets the shared
ambition for North Lanarkshire to be the place to live, learn, work, invest, and visit. This musters
combined resources and delivers change in a way that recognises the need for partnership and co-
operation to address challenges through integrated solutions that will make a difference to the lives
of people who live in North Lanarkshire’s communities.  The Capital Strategy supports the
development of capital investment proposals up to 2028/29 based on available resources aligned
to The Plan for North Lanarkshire, Best Value, the Financial Regulations (link), the Corporate Asset
Management Plan (link), and the Medium-Term Financial Plan (link) established within the
overarching Financial Strategy (link). 
5. Longer-term financial planning is integral to the council’s Financial Strategy and to the strategic
approach to budgeting. Effective decision making relies on robust financial planning and the
Medium-Term Financial Plan assists in ensuring resources are aligned to the key priorities outlined
in The Plan for North Lanarkshire and are affordable and sustainable. The Medium-Term Financial
Plan 2025/26 to 2029/30 (approved in June 2024 - link) reflects the financial risks that may impact
on the council’s ability to continue to provide high quality services focussing on the strategic
priorities, while balancing the budget. Therefore, this plan continues to consider a range of
scenarios and highlights the associated forecast budget position in order to support the council’s
approach to maintaining financial sustainability in the delivery of the Programme of Work and
associated services.  An update to the Medium-Term Financial Plan for 2026/27 to 2030/31 is
scheduled to be presented to the Policy and Strategy Committee in June 2025. 
6. Capital investment proposals up to 2028/29 are set out in the Strategic Capital Investment
Programme for 2024/25 to 2028/29 (approved at committee in March 2024 - link). An annual update
to the programme was considered by committee in March 2025 (link); this highlights record levels
of capital investment of £856 million over the five-year period as the council continues the delivery
of its long-term place shaping transformation of North Lanarkshire’s towns and communities.
Alongside record levels of investment in the council’s housing provision through the Housing
Revenue Account, this represents potential investment of £1.685 billion in North Lanarkshire’s
towns and communities. Key highlights in the proposed investment programme include:
• £347 million to continue investment in the Town and Community Hub programme and funding
to complete projects in Abronhill, Glenboig, and Ravenscraig.
• £41 million of additional targeted investment the council’s school, culture, and leisure estate
which will include a strategic review of the council’s pool estate.
• City Deal investment of £95 million, including resources to progress the East Airdrie Link Road
project.
• £45 million investment in the council’s Economic Regeneration Delivery Plan to support the
ongoing transformation of North Lanarkshire’s town centres, including ongoing work to
transform Cumbernauld town centre.
• £37 million key infrastructure investment in bridges, flooding, active travel, and road safety.
• £18 million investment in the Parks Masterplan, including funding to enable the redevelopment
of Strathclyde Park Watersports Centre.
• £23 million investment in business and digital systems as the council continues its digital
offering.
• £13 million investment in Community Boards with a key aim of evolving the council’s approach
to facilitating community asset transfers. 
7. With its focus on improving the council’s housing stock, providing safe and sustainable domestic
properties for local tenants, and contributing to local place-based regeneration, the Housing Capital
Programme also plays a key role in supporting delivery of The Plan for North Lanarkshire vision. 
Reports in this respect were approved at committee in February 2025 (link) and May 2025 (link). 
Monitoring of the HRA Capital Programme is carried out through regular reports to the Housing
Committee. Page 107 of 174

Page 108

8. Delivery of the Strategic Capital Investment Programme is monitored through reports to committee
each cycle, with the latest being considered by Finance and Resources in May 2025 (link).  A
regular exceptions report is also considered by the Business Management Team which supports
senior management oversight and scrutiny of capital projects with a budget over £0.100m that have
a red delivery status.  The latest version of this exceptions report is available to view in the Audit
Scotland / NLC shared evidence platform within the financial plans folder.   
9. The Strategic Capital Investment Programme report in March 2025 also includes an update to the
Strategic Capital Delivery Group (SCDG) terms of reference (link) to reflect changes to the council’s
senior management team structure as outlined in the report to committee in September 2024 (link),
as well as an update to the group’s objectives to reflect the revised process for monitoring capital
programme delivery and financial management of the capital programme, an update to the
membership of the group to reflect senior management team changes and to confirm the roles of
subject matter experts on the group, and to provide clarity of the new emerging priorities protocol
agreed by the SCDG to manage unfunded burdens. 
10. The Programme of Work is the delivery vehicle that is making The Plan for North Lanarkshire real. 
Since its implementation in 2019, the Programme of Work has been instrumental in stabilising the
strategic direction of the council (including work in partnership) in the face of a fast paced, rapidly
changing, and relentlessly uncertain future local government environment, while allowing for
appropriate flexibility in the operational delivery of many complex inter-connected programmes,
projects, activities, and plans to ensure a dedicated focus on transformational change that improves
the lives of local people.   
• The latest Programme of Work to 2028 (approved in March 2023 - link to report and glossy)
was a change in approach to previous years in that it was reframed within the latest North
Lanarkshire context provided by the 28 health check indicators and provided a consistent
platform for delivery covering five years.  This new approach was critical to ensure an even
greater focus on escalating the pace and depth of change that is essential to ensure a
heightened and more strategic focus on not only sustaining the economic and community
aspects that will enable local people and communities (and the place that is North Lanarkshire)
to thrive, but also on ensuring a more targeted approach to improving social conditions,
outcomes, and people’s lives.
• The Programme of Work to 2028 comprises seven priorities for delivery.  The five front facing
priorities - Transforming Places, Invest in North Lanarkshire, Sustainable Futures, Resilient
People, and Brighter Futures - are supported by priorities which are key to enabling delivery:
- Digital North Lanarkshire - to develop a skilled digital workforce, promote an innovative,
sustainable culture, and be the digital leader for a transformed North Lanarkshire.  This
programme is a key enabler in delivering the other programme of work priorities and driving
economic growth as well as transforming the education and abilities of learners of all ages.
- One Service - to ensure services are delivered, regardless of owner, in a streamlined,
efficient, and supportive model.  This programme is a key enabler in delivering the other
programme of work priorities and ensuring the council delivers services (regardless of
structures or the alignment of functions) in line with the overall vision of inclusive growth
and prosperity for all.  
• Delivery of the Programme of Work is monitored through a single integrated council wide
Delivery Plan (for which reports were considered at committee in September 2023 - link and
March 2024 - link).  These reports also set out the governance arrangements supporting the
Programme of Work and its Delivery Plan.
• Subsequent six monthly updates have been reported to committee in terms of delivering the
priorities in the Programme of Work and its Delivery Plan. This also provides a summary of
key highlights achieved and reiterates the consistency and importance of a one place one plan
one council approach in delivering the vision of The Plan for North Lanarkshire through the
Programme of Work to support the long-term place shaping transformation of North
Lanarkshire’s towns and communities.
• September 2024 - link.
• March 2025 - link. 
Page 108 of 174

Page 109

11. A suite of reports to Policy and Strategy Committee in cycle 1 each year reflects on Programme of
Work achievements to date, along with the latest performance results through the 28 health check
indicators and plans for the year ahead.  This enables the Policy and Strategy Committee to
maintain their strategic oversight role of the overall Programme of Work to 2028 in relation to
“development, co-ordination, and monitoring of The Plan for North Lanarkshire” and to keep under
review such “programmes as the Committee considers necessary to achieve the council’s long-
term aims and objectives” (in line with the scheme of administration).  Links to the March 2025 suite
of reports are below:
• Delivering the Programme of Work to 2028 - key achievements - March 2025 (link).
• The latest North Lanarkshire context, challenges, and next steps - March 2025 (link). 
12. As noted in the reports referenced in paragraph 10 above, the suite of health check indicators
continue to play an important role in informing delivery of the Programme of Work to 2028 to ensure
that the stubborn scale of deprivation in areas that are hardest to reach is targeted through policy
developments that are focused on tackling unstable trends and improving social conditions. This is
a critical aspect to assessing impact and ensuring the success of the place-based ambition of The
Plan for North  Lanarkshire, as both place-based regeneration and person-based policies need to
cross policy sectors and be developed and implemented in tandem - as well as integrated with
wider investment and poverty reduction strategies - if transformational change is to truly make a
difference. As such, a mid-term review of the five-year Programme of Work is underway that is
informed by the latest results for the 28 health check indicators as well as supplementary evidence
and context. A broad overview of this review is set out in the March 2025 report (link). 
13. The Programme of Work is also supported by a reporting schedule which provides an indicative
timescale of when reports on specific Delivery Plan items are scheduled to be reported to relevant
stakeholders, including council committees.  A summary of all reports (as at cycle 1 of 2025) is
available to view in the Audit Scotland / NLC shared evidence platform within the governance folder. 
Three examples of specific programmes and/or projects in respect of plans linked to transformation
and the council’s priorities are noted below: 
• The Strategic Asset Review and Investment Strategy (SARIS) was established in December
2023 (link) to create greater integration of the wider community within the assets in the Hub
programme (including due consideration of the increasing older adult population), to adapt
existing facilities to make them more accessible and usable to the wider communities, and to
invest and rationalise the learning and wider estate to make it more efficient and thus
sustainable.  An update report in September 2024 (link) highlighted the progress that has been
made and the opportunities available in relation to the school and wider asset portfolio.  It also
acknowledged that the current challenges necessitate a more blended approach to the
strategy linked to the school and wider estate - to maintain the momentum and to ensure the
offering within the highest priority communities is influenced and adapted as quickly as
possible.  Update reports in respect of delivering the corresponding Town and Community Hub
Programme are submitted to committee on a six monthly basis.  The latest report (February
2025 - link) also includes appendices in respect of the project plan and community benefits.
• The Economic Regeneration Delivery Plan (ERDP) is the council’s high-level economic
development framework which is aligned to the composite capital programme and delivers on
the first priority of The Plan for North Lanarkshire - improving economic outcomes and
opportunities for all (link to latest ERDP for 2023 to 2028).  Since its inception in 2019, an
ERDP Action Plan has been developed annually, detailing the key milestones and targets the
council and partners will take forward over the coming year to achieve the priorities set out
across the ERDPs four key interrelated themes.  The action plan for 2025/26 was approved at
committee in February 2025 (link). The governance arrangements for the ERDP are supported
by an annual performance report, the latest of which was reported to committee in August 2024
(link).
• As reported to committee in February 2025 (link), the initial proposals approved were to
increase the new supply programme by delivering 5,000 homes by 2035. This was strategically
linked to the re-provisioning of all tower blocks (4,600 flats) over 20 years. It was estimated
that around 2,300 new homes (50%) would be built on the sites of the tower blocks following
their demolition.  The target also included an assumption that the council would purchase
homes through the Empty Homes / Open Market Purchase Scheme which was expanded
further in 2023 to include private landlord properties with the aim of protecting vulnerable Page 109 of 174

Page 110

tenants at risk of homelessness.  
• In November 2024, an update was provided to committee (link) which outlined that the
new supply programme had achieved 46% towards its overall target of 5,000 homes by
2035 and approved targets for delivery of the programme up to 2035. The programme
has continued to deliver homes in the intervening period and to date, 1,581 new build
homes have been completed, including a record 335 homes in 2023/24, the second
highest number of social rented completions in Scotland. This update also provided a
breakdown of the delivery mechanisms utilised to achieve these figures such as traditional
new build, off the shelf acquisitions, and properties purchased via the Open Market
Purchase Scheme, which has facilitated the acquisition of 812 properties to date.
• A report to committee in February 2025 (link) provided an update on a review carried out
to identify opportunities for potential expansion of the new supply programme and to
explore alternative tenure options to support economic and population growth.  Through
this report it was approved to increase the new supply target to 6,000 homes by 2035,
while noting the financial implications of increasing the programme and the dependency
on continued Scottish Government grant funding.  
• A copy of the programme plan for the new supply programme is available to view in the
Audit Scotland / NLC shared evidence platform within the programme of work (specific
programmes) folder. 
B. To what extent do the council’s programme management arrangements facilitate
effective oversight of its transformation plans? 
14. Delivery of the Programme of Work has to date been supported by an annual review of the council’s
operating framework that focusses on the incremental structural refinements required to ensure
ongoing alignment of vision, plan, governance, and operations in the place-based transformation
of North Lanarkshire.  The latest report in this respect (link) was approved in September 2024 - this
reiterated the importance of the programme of linked reviews (reported to committee in December
2022 and December 2023) that have been critical to maintaining and safeguarding the sustainability
of the organisation’s capacity to secure the resources needed to deliver on the vision. These
reviews have specifically focused on further supporting the delivery of place-based transformation
(i.e. environmental assets, council assets and properties, community operations, and associated
services and functions) as well as incremental structural refinements and the resultant impacts
across Chief Officer portfolios.  Policy and Strategy Committee approvals of the reports in
December 2022 (link) and December 2023 (link) have supported the approach to build the
organisation’s capacity by ensuring already challenged resources are maximised through the
creation of single council operations, single Chief Officer portfolios, and single service
accountability which have underpinned the structural refinements to date.  Changes to Chief Officer
portfolios have also been instrumental in more effectively supporting delivery of the Programme of
Work and driving forward the synergies and changes required to realise the successes achieved
to date.  This followed structural changes in 2020 to strengthen the focus on communities and
ensure the structure of the council’s senior management team fully reflected the model established
through the nine Community Boards, with Chief Officers being assigned as Community Co-
ordinators to each Board. 
• The wider structural report in September 2024 was subsequently supported by a strategic
workforce report in December 2024 (link) presented within the context of what The Plan for
North Lanarkshire aims to achieve.  This report recognises the key workforce and wider labour
market challenges facing both the council and North Lanarkshire (and the impact that one has
on the other), and the associated risks and areas of work that are required to address current
and future workforce gaps and priorities - not for the council or North Lanarkshire alone, but
through a wider unified approach.  This report also provides a progress update on the One
Workforce Plan and strategic workforce priorities to 2028.  
• In line with their terms of reference to ensure services are delivered in a streamlined, efficient,
and supportive model, the One Service programme of work is a key enabler in delivering the
other programme of work priorities and ensuring the council delivers supports and services
(regardless of structures or the alignment of functions) in line with the overall vision of inclusive
growth and prosperity for all. In delivering this priority, the One Service Programme of Work
Strategic Board has an overarching focus on the delivery of the council’s transformational
activities through the Programme of Work to ensure a one place, one plan, one council Page 110 of 174

Page 111

approach in terms of resources (finances / staffing / technology / assets), capabilities, and
capacity.  As such, work is currently underway to review and update each service’s strategic
workforce plans (previously updated in 2024) to ensure an approach to workforce / resource
planning that is sustainable and further supports the scenario planning / forecasting work
previously carried out in 2023 in respect of future planning and the development of the
Leadership and Operating Model for the Community Hubs. 
15. As noted in paragraph 10 above, delivery of the Programme of Work is monitored through a single
integrated council wide Delivery Plan (for which reports were considered at committee in
September 2023 - link and March 2024 - link). These reports also set out a summary of the
governance arrangements supporting the Programme of Work and its Delivery Plan. 
• As noted in paragraph 3, regular updates are provided to committee in respect of the
supporting Community Investment Fund.  An update is also provided to Finance and
Resources Committee each cycle in respect of the Strategic Capital Investment Programme. 
16. The governance supporting the Programme of Work recognises that not all of what is to be
delivered through the Programme of Work is capital investment that will be monitored and governed
through the Strategic Capital Delivery Group and Finance and Resources Committee, therefore
arrangements are in place to ensure a focus on maintaining a corporate one place one plan one
council approach across the organisation to ensure each stage of delivery through the Programme
of Work - towards achieving the overall vision set out in The Plan for North Lanarkshire - is
appropriately aligned, planned, guided, implemented, monitored, and governed.  This approach
comprises the following key points of note: 
• Since the Programme of Work to 2028 was approved in March 2023, six Programme of Work
Strategic Boards have been established, with core and non-core members, and advisers
identified (e.g. in respect of financial, legal, and risk).  These Boards first began meeting in
June 2023 approximately every four to eight weeks and have been supported by a range of
governance processes which have been further standardised and aligned since.  Each
Programme of Work Strategic Board is chaired by a Senior Responsible Officer (SRO) with
support from a Depute SRO; all are Chief Officers and all are members of the Corporate
Management Team.  As the Boards have become established, the frequency of meetings has
moved to quarterly in 2025. 
• 1:1 meetings are in place between the Senior Project Officer (Programme of Work) and each
Programme of Work Senior Responsible Officer regarding papers and priorities for meetings.
This includes regular reviews of the membership of each Board, including changes to SROs /
Depute SROs in line with the aforementioned organisational structural changes.
• All Strategic Boards have completed a risk related Programme Uncertainty Level Status
Evaluation (PULSE).  A progress monitoring process is in place that includes the reporting of
Risk through quarterly monitoring reports to each Strategic Board and the Corporate
Management Team, and also a regular review and update to the PULSE.  The purpose of the
PULSE is as undernoted:
• To determine the level of confidence in relation to key elements of uncertainty.
• To assist the Strategic Board in understanding the interdependencies on its projects and
activities from both projects and activities within its control and where there are
dependencies on projects or activities as part of other Programmes of Work.
• To assist the Strategic Board in understanding where other Programmes of Work / projects
/ activities have dependencies on the delivery of projects and activities within this Strategic
Board's remit.
• To assist the Strategic Board in its decision making and determining, should the need
arise, the reprioritisation of projects or activities for delivery and delay or cancellation and
ensuring that decision making considers and seeks to minimise resultant impacts across
all Programmes of Work.
• The single Integrated council wide Delivery Plan comprises a detailed plan of the actions to be
delivered with indicative timescales, and responsible officers, against which Programme of
Work delivery can be monitored.  A Change Request process ensures a simple and seamless
co-ordination and approvals process is in place to manage changes requested to the Delivery
Plan. 
•  The scale of local investment in delivering The Plan for North Lanarkshire (as set out in
paragraphs 3 and 6) involves significant risks and means that good decision-making and Page 111 of 174

Page 112

effective management of individual programmes and projects is vital if these are to be delivered
to cost, time, and quality. The council’s Project Management Framework therefore provides a
comprehensive approach that outlines the processes and techniques which will help to scope
and manage a project, meet agreed milestones, fulfil appropriate reporting and assurance
requirements, involve the right people at the right time, implement each stage of delivery from
start to finish, and achieve the expected benefits or improved outcomes of each project. It is
designed to promote and encourage best practice in the management and delivery of capital
and non-capital programmes - and construction and non-construction projects - and all projects
across the council and aims to help all employees involved in project management regardless
of their role and previous experience.  The role of individual programme or project Senior
Responsible Officers (SROs) / Project Managers is clearly set out therein.
•  The key role of the Policy and Strategy Committee was reiterated in the aforementioned
reports to committee in terms of ensuring the continuing commitment to delivering The Plan
for North Lanarkshire through the Programme of Work and ensuring oversight of the council’s
approach to managing strategic change in this respect.  The report in March 2024 (link), sets
out that six monthly reporting arrangements will enable the Policy and Strategy Committee to
maintain their strategic oversight role of the overall Programme of Work to 2028 in relation to
“development, co-ordination, and monitoring of The Plan for North Lanarkshire” and to keep
under review such “programmes as the Committee considers necessary to achieve the
council’s long-term aims and objectives”.  
•  An annual review process continues to support the Programme of Work to 2028.  This ensures
the council continues to (a) be able to adapt the Delivery Plan to changing circumstances, (b)
absorb the impact of major unpredictable situations in order to keep plans relevant and the
timescales therein realistic, and (c) assess incremental changes and impacts arising from
updates to the results for the 28 health check indicators.  This review process is carried out by
each Strategic Board respectively (e.g. Brighter Futures and Digital North Lanarkshire have
recently undertaken such a review) and, as noted in the report to committee in March 2025
(link), a wider interim review is currently underway of the overall Programme of Work. 
•  Following approval of the set of high-level Programme of Work Deliverables in September
2023, each Chief Officer has reviewed and updated their Project Register accordingly to
ensure ongoing alignment.  These Registers continue to be reviewed and updated twice a
year, as per Corporate Management Team approval in September 2022 that Chief Officers
would submit a copy of their Project Registers as at the end of September and as at the end
of March.  The latter date aligning to the submission of the Chief Officer Annual Certificate of
Assurance and Checklist process that supports the council in demonstrating compliance with
the principles of good governance, as set out in the national Delivering Good Governance in
Local Government: Framework (2016).
•  The updates to the Chief Officer Project Registers enabled the Quality Assurance
arrangements (approved at Corporate Management Team in October 2023) to be implemented
to assess compliance with the Project Management Framework. Quality Assurance
arrangements in respect of the process to monitor delivery of projects and activities supporting
the Programme of Work were rolled out in 2024 to all Programme of Work Project Managers /
Activity Leads. This comprises the allocation of a RAG status against the seven
aforementioned dimensions (i.e. risk, scope, quality, time / schedule, resources, cost / budget,
and completed status) to each of the items in the Delivery Plan.  The Quality Assurance
process is subject to regular audits by Internal Audit and also to regular review and strategic
oversight by the Audit and Scrutiny Panel (February 2024 - link; February 2025 - link).
•  Upon completion of the Delivery Plan for the Programme of Work, the Corporate Management
Team carried out their strategic oversight role in February 2024 to provide a significant focus
on delivering the Programme of Work and managing strategic change. This session played a
key role in strengthening the strategic connections across all seven Programme of Work
priorities to support delivery on the ground and in ensuring the direction in line with The Plan
for North Lanarkshire remained steadfast.  Following this initial session, each of the seven
Programme of Work priorities was subject to strategic oversight and review at a wider
Corporate Management Team session during 2024.  These sessions provided the Corporate
Management Team with achievements to date, priorities, progress being made in delivering
the priorities, connections, impact on the 28 health check indicators, challenges, and any asks
of the senior management team.
•  Governance arrangements supporting the operation of the Strategic Boards include agendas,
minutes, action notes, membership lists, terms of reference, PULSE risk assessment files, as Page 112 of 174

Page 113

well as monitoring reports (reporting on progress of the Delivery Plan) to the Corporate
Management Team and Strategic Boards.  These files are available to view in the Audit
Scotland / NLC shared evidence platform within the governance folder (and the various sub
folders underneath). 
17. As noted in paragraph 13, the Programme of Work is supported by a reporting schedule which
provides an indicative timescale of when reports on specific Delivery Plan items are scheduled to
be reported to stakeholders, including Elected Members progress reports to council committees. 
Quarterly monitoring reports are also produced for each of the Programme of Work Strategic
Boards and the Corporate Management Team.  A summary of all reports (as at cycle 1 of 2025),
and the latest quarterly monitoring reports to the Corporate Management Team and the Strategic
Boards, are available to view in the Audit Scotland / NLC shared evidence platform within the
governance folder. 
C. To what extent are communities and partners involved in the development and delivery
of the council’s plans for transformation? 
18. As noted in paragraph 2, the one place one plan approach which The Plan for North Lanarkshire
embodies - and the vision of inclusive growth and prosperity for all - was endorsed by all partners
in the North Lanarkshire Community Planning Partnership and has had the ongoing commitment
of partners and local Elected Members since it was established.  Nine Community Boards are in
place to support community involvement and provide a single approach for local community-led
engagement and decision-making (as per the original plans set out in a report approved at
committee in March 2020 (link). This consistency of commitment at a strategic, community, and
political level has led to significant achievements which have been pivotal in maximising the
potential of North Lanarkshire as a place. 
19. Stakeholder feedback continues to be central to developing delivery plans and priorities to progress
Programme of Work projects and activities.  This includes through Community Boards (as noted in
paragraph 18 above) as well as the council’s website (link) and Community Matters (link).  Various
public and stakeholder feedback events on many significant local developments have allowed
residents to provide their views and shape the next steps; the most recent of these includes the
following: 
• Development of the wider regeneration plans, that form part of the Programme of Work in
terms of town action plans, were informed by public consultation.  An update in this respect
was reported to committee in May 2024 (link) and there are also dedicated web pages in
respect of the town centres programme on the council’s website (link).  A briefing note,
providing an update on delivery of the town centre transformation programme, is available to
view in the Audit Scotland / NLC shared evidence platform within the communities and partners
folder.
• The first stage of consultation took place with local residents to develop the Cumbernauld Town
Masterplan ran for six weeks and included an exhibition showing how the town centre could
look through concept designs.  Most feedback was supportive of the regeneration plans and
wanted a town centre to be proud of.  This was followed by the first steps to regenerate
Cumbernauld town centre as contractors go on site to demolish Fleming House.  This kicked
off the 15-year plan to regenerate the town centre to create a new town hub with education,
health, community and leisure facilities, public transport improvements, and modern bespoke
retail and commercial outlets.  The council’s website contains dedicated web pages for the
transformation of Cumbernauld Town Centre (link); this also provides information regarding
consultation responses.
• Residents were invited to share their views for a new Local Transport Strategy that will shape
how the infrastructure is developed and maintained across North Lanarkshire over the next
ten years. The Strategy also aims to support national efforts to reduce car use, lower carbon
emissions, and promote active travel, such as walking, wheeling, and cycling. The council’s
website provides an update in respect of the strategy development (link).
• Residents were invited to share their views on places in North Lanarkshire - homes, recreation,
access, transport, employment, and services - as part of the preparations for the next Local
Development Plan, which will decide where things like homes, shops, businesses, and
amenities are built.  The council’s website (link) provides further information in this respect. Page 113 of 174

Page 114

• Public consultation took place on the updated design for the East Airdrie Link Road (as part of
the Glasgow City Region City Deal) to demonstrate the location of junctions, roundabouts, and
bridges and show the reduced impact on land and properties.  This is designed to improve
journey times and transport reliability, air quality, and connections between residential areas,
town centres, business centres, employment, and education by relieving congestion along the
existing A73.  The council’s website provides an update in respect of the next steps for this
programme (link).
• Residents, partners, and local organisations were asked for their input to understand digital
needs and preferences for two new digital zones in local facilities (at the Buchanan Centre in
Coatbridge and Chryston High School). Digital zones will be a dedicated space equipped with
technology and resources to help people improve their digital skills, get involved online, and
feel more confident and digitally included.
• The conclusion of a significant programme of public engagement in respect of the first phase
of Rediscovering Airdrie.  This programme aims to restore and repurpose heritage assets,
improve the townscape, and increase community pride and awareness of local heritage in
order to further promote North Lanarkshire an attractive visitor destination. This enables next
steps development of plans and a funding application to support implementation of the
programme.  The council’s website provides further information in respect of this programme
(link).
• Plans for Coatbridge include the establishment of a Neighbourhood Board and related
governance arrangements, development of a Regeneration Plan, and an accompanying initial
four-year investment plan and governance requirements - an update in this respect was
reported to committee in May 2025 (link). This is accompanied by a consultation and
engagement findings report for the long-term plan for Coatbridge which is also available to
view in the Audit Scotland / NLC shared evidence platform within the communities and partners
folder along with the outputs from a perceptions study. 
20. The council’s Communications and Engagement Strategy (updated in June 2024 - link)
demonstrates the approach to stakeholder engagement in respect of council’s plans.  Engagement
is also a key part of the development of the leadership and operating model for the Hub programme
(latest reports in this respect: June 2024 - link and December 2024 - link) which also involves the
integration of partner organisations within Community Hubs. 
21. Following approval of the series of reports at Policy and Strategy Committee in March 2024, a
programme of staff roadshows was developed to be delivered by the council’s Chief Officers in 42
venues across North Lanarkshire on a range of dates and times from April until the end of June
2024. The programme included sessions with Elected Members, Community Boards, and partners. 
The aim was to communicate the key messages to participants in respect of The Plan for North
Lanarkshire and what it has achieved to date and what the priorities are for delivery moving forward. 
It provides an opportunity for participants to engage directly in the delivery phase of the Programme
of Work.
• Following a presentation at each of the Roadshows, an engagement session was facilitated
with participants and feedback sought. The majority of most staff feedback aspects was
extremely positive, especially around supporting and being part of The Plan for North
Lanarkshire and the Programme of Work - in this respect 92% of attendees advised they
thought their role contributes to The Plan for North Lanarkshire and 80% said they thought the
Programme of Work was getting it right in terms of achieving the right outcomes.  A summary
of the feedback is available to view in the Audit Scotland / NLC shared evidence platform within
the communities and partners folder. 
22. A new Community Ownership and Management of Council-Owned Assets policy was approved at
committee in June 2024 (link) to assist in the better use of assets by community groups, whether
through formal Community Asset Transfer or other mechanisms.  This policy brings together all
elements of community use in a single place and sets out the requirements for groups, the council,
and other stakeholders.  It also includes a framework for consideration of leases with respect to
council assets.  This policy supports the place-based vision of The Plan for North Lanarkshire by
empowering local communities and giving them control over assets owned or leased by public
bodies, including councils, that can be used to address local need, promote community
development, and enhance wellbeing.  An annual report is submitted to committee in respect of
community engagement and participation in this process, with the latest being in August 2024 (link).  Page 114 of 174

Page 115

Since the introduction of the policy, four transfers have been approved at committee:
• Overtown sports pitch and pavilion - October 2024 (link)
• Application from Palm Church for the asset transfer of Rochsoles Community Centre - April
2025 (link)
• Application from Chapelhall Community Development Group for the transfer of land at
Chapelhall Senior Citizens Centre - April 2025 (link)
• Application from Deaf Services Lanarkshire for the asset transfer of Shawhead Community
Centre - April 2025 (link) 
23. Various oversight and outcome reports are considered by the council and partnership bodies to
further support widespread engagement and involvement; this includes the following: 
• An annual oversight and outcome report to committee (latest in February 2025 - link) highlights
where community planning in North Lanarkshire is making a positive impact in strengthening
partnership working and improving outcomes in line with The Plan for North Lanarkshire’s
shared ambition.
• A six monthly update to committee reports on progress and provides a snapshot linked to key
priorities for each of the nine Local Outcome Improvement Plans (LOIPs) (latest in February
2025 - link).  The report also provides an overview of progress with implementation of the
Management and Monitoring Framework and work to develop the role of the Local Partnership
Teams.
• A report to committee each cycle provides an update on key progress linked to supporting the
Community Boards model and the Boards and partnership communications strategy therein;
the latest of which was reported in April 2025 (link).
• The North Lanarkshire Partnership Strategic Leadership Board (SLB) for the Community
Planning Partnership continues to meet approx. every 10 weeks and the delivery of many
Programme of Work activities are discussed to seek wider involvement.  New, or updates to,
partnership policies (e.g. the Lanarkshire Mental Health and Wellbeing Strategy, Tackling
Poverty Strategy, Children’s Services Partnership, and the Community Safety Strategy) are
also reviewed and discussed to ensure ongoing alignment with the vision for North
Lanarkshire.  Copies of a sample of the SLB meeting papers are available to view in the Audit
Scotland / NLC shared evidence platform within the communities and partners folder.   
24. Since adopting The Plan for North Lanarkshire when it was established in 2019, the North
Lanarkshire Partnership Strategic Leadership Board (SLB) for the Community Planning Partnership
has continued to be integral in the development and delivery of the Programme of Work and
partnership activities therein.  The Programme of Work and annual performance report (in respect
of the 28 health check indicators) have remained key items on the SLB agenda to (a) ensure
ongoing alignment of activities supporting delivery of The Plan for North Lanarkshire, (b) support
an informed and constructive peer challenge and review process across partner organisations, and
(c) inform discussions and decisions in relation to partnership activities (e.g. around public health
and whole family support) in order to stay true to the ambition for whole place-based transformation
of North Lanarkshire (through a one place one plan approach) and ensure the partnership remains
focused on transformational change for the benefit of local communities and to improve the lives of
local people.   
25. As noted in paragraph 13, the Programme of Work is supported by a reporting schedule which
provides an indicative timescale of when reports on specific Delivery Plan items are scheduled to
be reported to stakeholders, including Elected Members progress reports to council committees. 
This is available to view in the Audit Scotland / NLC shared evidence platform within the governance
folder.  Many articles are also available on the council’s website to support wider public performance
reporting.  Some examples include: 
• Economic Regeneration Delivery Plan (ERDP) - annual performance report, the latest of which
was reported to committee in August 2024 (link) and to the public through news articles (link
and link).
• New supply programme - regular progress update report, the latest of which was reported to
committee in November 2024 (link) and to the public through news articles (link).  Reports and
news articles in this respect also provide an update in respect of community benefits (link and
link). Page 115 of 174

Page 116

• Housing and homelessness - annual performance is reported via the council’s website (link
and link) and through the Temporary Accommodation Strategy 2024-29 (link). 
26. Following a short-life Elected Member / Officer working group to examine the relationship and
dependencies between the council, the third sector, and communities and consider how the longer-
term sustainability of the third sector could be supported, a report with recommendations was
approved at committee in December 2024 (link). While the work of the group, and its
recommendations, are owned by the council, their successful implementation necessarily involves
considerable input, and in some cases partial ownership by a range of others, including VANL, the
other community planning partners and representatives of the third sector. As such, formal and
informal structures in places are being used to increase awareness of the work of the group and
ensure that the actions required to ensure successful implementation are well understood by all
stakeholders. 
27. A range of targeted community based initiatives are underway, some recent examples in this
respect are summarised below. 
• Delivery of the Digital North Lanarkshire programme of work is supported by twice yearly
updates on progress with the Driving Digital Locally sub-group (latest reports February 2025 -
link).  These reports provide an update on progress to date in terms of a number of key local
digital activities, this includes the progress of the Driving Digital Locally working group, success
of the intergenerational projects which bring together elderly residents and local primary
schools, feedback regarding the stakeholder engagement for the proposed Digital Zones, the
public Wi-Fi project, and the online chatbot tool.  
• Three more immersive experience facilities are now in operation at Motherwell Library,
Summerlee Heritage Centre, and Airdrie Library to add to the innovative experience first
launched at Muirfield Community Centre. These create opportunities for communities, staff,
and partners in many aspects, including digital skills development, health and wellbeing
improvement, social skills development, educational attainment, and pathways to future
learning and employment.  Updates in this respect were reported to committee in August 2024
(link) and October 2024 (link).
• Following national funding, the council introduced access to free period products in schools;
this was followed by additional funding to all local authorities to increase the number and range
of places where period products are available free of charge to those who need them, with a
focus on publicly accessible buildings. The purpose of the funding for schools remains to
support equality, dignity, and rights for those who menstruate and to ensure that lack of access
to products does not impact on an individual’s ability to fully participate in education, at all
levels.  The main intent of the wider roll out for community provision remains tackling poverty
but also wider need and to address the overarching gender equality and dignity issues that
affect all of those who menstruate regardless of income. Currently, spending is split between
school and community provision. This approach has been designed to reflect the needs of
communities across the council area and continues to be informed by the findings from online
consultation with residents.  An update in this respect was provided to committee in October
2024 (link). 
28. In February 2025, the council and NHS Lanarkshire signed up to working collaboratively on two of
Scotland’s largest infrastructure projects to benefit people in Lanarkshire (link). The proposed East
Airdrie Link Road (link) is planned to improve connectivity and reduce journey times across the
region, including providing access to the state-of-the-art new University Hospital Monklands (link
and link). The Memorandum of Understanding, signed by the council and the health board’s
Monklands Replacement Project (MRP), sets out the agreement to work together to deliver the
best outcomes for communities.  This file, along with the terms of reference for the project interface
board, is available to view in the Audit Scotland / NLC shared evidence platform within the
communities and partners folder. 
D.  To what extent has the council considered the impact of its transformation activity,
including on vulnerable or protected groups?   
29. As noted in paragraphs 10 and 11, The Plan for North Lanarkshire is supported by a suite of high-
level health check indicators that collectively provide the context for North Lanarkshire as a place. Page 116 of 174

Page 117

By providing the local demographic, social, and economic profile these indicators were key to
shaping the long-term vision set out in The Plan for North Lanarkshire when it was approved in
2019, and they have continued to provide a robust, consistent, and independent way of assessing
progress and impact since then. The suite of indicators has also played an important role in terms
of informing the council’s strategic planning process through the Programme of Work. 
30. The latest results for each of the 28 Health Check Indicators (reported to committee in March 2025
- link) now reflect a period after the pandemic. This has enabled a much clearer interpretation of
the impact of the pandemic on what The Plan for North Lanarkshire set out to achieve when it was
established.  The impact can be seen in much of the data for the years 2020 and 2021 (the
pandemic years) compared to 2019 (pre-pandemic) and 2022, 2023, and 2024 (the aftermath of
the pandemic). Notwithstanding this, there remains significant gains when comparing the latest
results available to the baseline set when The Plan for North Lanarkshire was established in 2019,
and the latest results show positive trends in a number of key economic and social indicators.  It
should be noted that the summary below reflects a moment in time when the report was submitted
to committee in March 2025. 
• Gross weekly pay continues to show a positive increase for the third year in a row; wages are
level with the national average. For both full-time and part-time workers, the gap in the hourly
rate of pay between males and females continues to narrow and remains smaller than it is
nationally.
• Following a period of decline and slow recovery, self-employed rates are now showing a
marked improvement that returns this position to pre-pandemic levels. 
• Economic growth continues to show a positive picture with the latest results showing an
increase of almost 9% in gross value added per head. 
• The number of working age people claiming employment related benefits has continued the
gradual downward trend that was first experienced towards the end of 2020 and is now 8%
lower than The Plan for North Lanarkshire baseline. 
• School exclusion rates continue to show significant improvement for both measures in relation
to all pupils and looked after children, with the latest figures now below the national average
and the comparator figures for similar councils. 
• The gap in educational attainment between overall results and results for pupils living in the
20% most deprived areas shows a decline compared to recent years and is lower than the
national average. 
• Life expectancy for males in North Lanarkshire has shown a small gain following two data
series dips in a row. 
• Satisfaction levels for carers feeling supported to continue their caring role has improved in
the most recent survey. 
• North Lanarkshire’s waste recycling rates have reached an all-time high and are now above
the national average. 
31. An update in respect of the council’s Public Sector Equality Duty was reported to committee in April
2025 (link); this reports that the vision in The Plan for North Lanarkshire has been fully reflected in
the equality outcomes for 2021 to 2025.  Moving forward, 10 outcomes have been set for 2025 to
2029; this follows extensive consultation and evidence gathering exercises to ensure the final
outcomes were informed by: 
• The council’s continuing ambitions, priorities, and Programme of Work. 
• The progress made in relation to the council’s equality outcomes 2021-25. 
• Evidence which shows where the most disadvantage and inequality persist for different groups
of people protected by the Equality Act 2010. 
• Direct input from services on known challenges and priorities for disadvantaged groups. 
• The views of local people (who share protected characteristics and represent those people),
employees, and Elected Members through direct engagement activity. 
• Information from the 2022 Census. 
• The Is Scotland Fairer report published by the Equality and Human Rights Commission.
• The Public Sector Equality Duty (General Duty). 
• In light of the progress in the development of the council’s operating model for the Hubs
programme, and significant consultation with residents and communities on their preferences
for future service delivery (including a focus on accessing services via digital technology), a Page 117 of 174

Page 118

new equality outcome was also included to reflect the council’s clear intent to develop service
delivery arrangements that will better take account of the needs of residents with protected
characteristics. 
32. The update in respect of the council’s Public Sector Equality Duty in April 2025 (link) also provides
information on progress over the last four years (2021 to 2025) and what aspects of the general
duty each outcome advances. Each outcome also includes a spotlight initiative to highlight areas
of success and to bring to life some of the work undertaken to achieve progress against each
outcome. 
• Aligned to all Programme of Work priorities, the council’s equality outcomes are specifically
mainstreamed within four of the priorities for delivery to ensure that equality sits at the very
heart of the council’s transformation programme, i.e. Resilient People, Brighter Futures, Digital
North Lanarkshire, and One Service (April 2025 - link).
• In May 2023, the Wellbeing and Tackling Poverty Committee endorsed a vision and strategy
to become a trauma informed and responsive organisation (link). The values and principles
which underpin being trauma informed align with The Plan for North Lanarkshire and, as such,
trauma is now a core component of the Programme of Work to 2028. The council and the
Health and Social Care Partnership signed the leadership pledge of support in 2023 to publicly
commit to this ambition and appointed three senior managers and an Elected Member as
champions to drive this change programme forward. 
33. Equality and Fairer Scotland Duty impact assessments are published on the council’s website: link). 
EQIAs to accompany the programmes noted in paragraph 13 are available to view from the links
below:
• Economic Regeneration Delivery Plan (ERDP) (link).
• New supply programme (link). 
• The EQIAs in respect of the Hub programme (and its supporting leadership and operating
model) are available to view in the Audit Scotland / NLC shared evidence platform within the
equalities folder. 
34. A range of targeted community based transformational initiatives are underway which have a focus
on vulnerable or protected groups.  Recent examples in this respect are summarised below: 
• As referenced in paragraph 27 above, the Driving Digital Locally intergenerational project aims
to educate older residents about digital technology through one-to-one training with young
people within their own community. Launched in 2022, this initiative encourages residents
based at retirement complexes to embrace technology, removing barriers to digital access and
subsequently transforming their life.  Now delivered in seven communities, the project has
supported 80 elderly tenants and 115 school pupils in North Lanarkshire to improve digital
skills through one-to-one training, supporting the tenants live safer, healthier, and more
connected lives. Nominated as a finalist for a Municipal Journal award (see brochure in shared
evidence platform), this project is one of the case studies submitted to the Best Value auditors
which demonstrates the transformation in local communities that is impacting on the lives of
old and young residents alike (and aligns to the Accounts Commission transformation
principles of vision, planning, governance, collaboration, and innovation).  This case study is
available to view in the Audit Scotland / NLC shared evidence platform within the case study
folder.
• Approved at committee in March 2025, the Digital Connectivity masterplan for council housing
tenants aims to provide digital connectivity for council housing tenants, creating the
foundations for transformational change to facilitate the introduction of enabling technologies
and solutions across multiple aspects of modern life. It builds on previous work undertaken to
identify potential delivery options and outlines the potential benefits of enabling digital
connectivity for council housing tenants, which will open up endless possibilities to radically
transform, for the better, the way in which the council delivers supports and services,
empowering tenants with increased choice and control over how they interact with services,
enabling faster access to services and improving customer experience.  At a more fundamental
level, the report approved in March 2025 (link) outlines the benefits realised which will provide
tenants with the foundations to achieve their full potential and prosper, improving access to
opportunities and reducing inequalities. Page 118 of 174

Page 119

• The Tackling Poverty Strategy update (reported to committee in April 2025 - link) focuses on a
number of initiatives that aim to deliver on the strategy driver of income from employment. 
This demonstrates the impact of council and partnership activities in this respect on targeted
groups of individuals across North Lanarkshire.
• Many community benefits have been derived through Programme of Work activities for various
specific programmes and targeted at vulnerable or protected groups.  This includes providing
jobs and training through the new supply programme, creating opportunities for local
businesses and supply chains through large scale regeneration programmes, targeted training
and recruitment for pupils with additional support needs, and summer placement programmes
for young people about to leave school.  Financial benefits have also been gained such as
donations from various groups to build beds for disabled plot holders and to work with young
people living in deprived areas, with non-financial support received from contractors donating
training, time, and excess materials for local projects. 
Page 119 of 174

Page 120

Page 120 of 174

Page 121

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    LN/PH Date 05/06/25 
City Deal Programme – East Airdrie Link Road Update 
From  Pamela Humphries, Chief Officer (Place)  
E-mail NobleLy@northlan.gov.uk Telephone Lyndsay Noble
07970016256 
Executive Summary 
This East Airdrie Link Road (EALR) Update Report informs the Policy and Strategy
Committee of the progress made to date on the Project and shares the details of the Pre
Application Notice and Pre Application Consultation that will support the next key milestone
of submitting a Planning application for the East Airdrie Link Road. 
As part of the Pre Application Notice, approval is sought for the inclusion of the Towers
Road link within the East Airdrie Link Road Project.  The Towers Road link has the potential
to provide an important east west link to the East Airdrie Link Road and provide a second
access to the Monklands Replacement Hospital. 
The opportunities the Towers Road link offers to both NHS Lanarkshire and North
Lanarkshire Council in supporting the delivery of two major investment Projects are also
set out for Committee.   
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Acknowledges the progress of the East Airdrie Link Project, and 
(2) Approves the inclusion of the Towers Road link within the scope of the East Airdrie
Link Road Project, subject to conclusion of viability assessment and funding. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (5) Grow and improve the sustainability and diversity of North
Lanarkshire's economy
Programme of Work Transforming Places
Item 5
Page 121 of 174

Page 122

1. Background 
1.1 The Glasgow City Region (GCR) City Deal is an agreement between the UK and
Scottish Governments and the eight GCR Local Authorities, with the sole focus of
creating additional economic growth.  The 20-year GCR Deal was accepted by GCR
Council Leaders on 20 August 2014 and incorporated: 
• implementing a £1.13bn Infrastructure Fund to improve the regional transport
network, regenerate sites for economic use and improve public transport
provision;
• supporting growth in the life sciences sector;
• helping small and medium enterprises to grow and develop;
• establishing programmes to support the unemployed; and 
• piloting new ways of boosting the incomes of low wage employees.   
1.2 The review of City Deal Programme took place in 2024 to ensure the Programme
remained fit for purpose and aligned to the Plan for North Lanarkshire and Programmes
of Work and to manage project delivery and, importantly, to assess cost pressures on
the projects. Following Enterprise and Fair Work Committee approval in May 2024 and
Glasgow City Region Cabinet approval in August 2024, the revised Programme now
allows for a stronger focus on strategic connectivity, and new road infrastructure to
enable regeneration and development. 
1.3 The City Deal Programme for North Lanarkshire, as part of the infrastructure fund
comprises the following sub projects: 
• A8/M8 Corridor Access Improvements
o Strategic Active Travel 
o Orchard farm Roundabout
• Glenboig Link Road (complete)
• Pan-Lan Orbital Transport Corridor
o East Airdrie Link Road
o Ravenscraig Access Infrastructure South (Motherwell to Ravenscraig
and Airbles Road Improvements)
o Motherwell Town Centre Transport Interchange (complete) 
1.4 This report focuses on the East Airdrie Link Road (EALR), a critical part of the Pan
Lanarkshire Transport Corridor.  The Pan Lanarkshire Transport Corridor is a strategic
north south corridor that connects South Lanarkshire, the M74, to Ravenscraig, the M8
at Chapelhall, to Cumbernauld, the M80 and beyond.  A regional investment of scale
and complexity bringing significant economic and transport benefits to North
Lanarkshire and the Glasgow City Region.  The largest City Deal Project in the Glasgow
City Deal Programme, the EALR presents opportunities for vast direct and indirect
benefits as detailed in section 3 of this report. 
1.5 As Committee is aware, the EALR will create a new north to south link between the M8
and south of Cumbernauld.  The proposed 10km single carriageway link will provide an
enhanced north south route through North Lanarkshire; to provide more reliable orbital
journeys through North Lanarkshire and to the wider City Region. It will improve
connectivity between main residential areas and clusters of employment in North
Lanarkshire and will enable significant employment, education and training
opportunities.
Page 122 of 174

Page 123

1.6 The proposed link road will also provide access to the Monklands Replacement
Hospital at Wester Moffat, Airdrie.  NHS Lanarkshire secured approval for their Outline
Business Case in July 2023 and planning permission for the new hospital in June 2024. 
The Monklands Replacement Hospital Project is now moving forward with enabling
works well underway and continuing throughout 2025 and 2026.   NHS Lanarkshire are
working with their contractor, Laing O’Rourke, alongside their consultancy design team
to progress the Project to Full Business Case in 2025.   
2. Report 
2.1 East Airdrie Link Road Update 
2.1.1 The Enterprise and Fair Work Committee approved the submission of the EALR Outline
Business Case in May 2024 and the Glasgow City Region Cabinet subsequently
approved the Outline Business Case in August 2024, which included the programme,
budget allocation and transport and economic benefits, allowing the Project to progress
to Full Business Case.   
2.1.2 The Project is firmly in the Design Manual for Roads and Bridges (DMRB) Stage 3
(preliminary design and planning), whereby the EALR project team are working with
consultants, AtkinsRealis to reach a critical milestone of a planning submission later
this year.  The planning application will be supported by an extensive environmental
impact assessment (EIA) considering the effect of the link road on the road network,
the environment, on noise, air quality and human health. 
2.1.3 The Project is progressing at pace, with many key elements being carried out in parallel
to maintain programme and manage costs, with the final road alignment design due to
be concluded in September 2025. To support this, public and landowner engagement
took place during November 2024 to January 2025 on the first draft of the proposed
road alignment design.  Feedback and comments received during the engagement has
informed the second draft road alignment design.  Responses received through this
engagement and earlier engagement have been fully considered and where relevant
have influenced and changed how the road alignment and its associated infrastructure
will be taken forward.   
2.1.4 The engagement with local members, statutory stakeholders, residents, land owners
and the wider public has been invaluable in developing the  link road from the preferred
route option at DMRB Stage 2, to a road alignment that will form the basis of a Pre
Planning Application Notice (PAN) and Pre Application Consultation (PAC) in advance
of the planning application planned for late 2025. 
2.1.5 Extensive survey and design work, alongside the engagement feedback, has enabled
a well-defined second draft road alignment and has allowed a greater focus on the
positioning of the road structures, better integration of the new road with local roads,
and importantly, more refinement of the alignment to lessen the impact on land,
ecology, landscape and woodland. 
2.1.6 A Pre-Application Notice (PAN) has been submitted to the Local Planning Authority on
30 May 2025.  The second draft road alignment forms the basis of the Pre-Application
Notice and the associated Pre-Application consultation (PAC).  The statutory
consultation as part of the PAN is intended to take place over summer with a second
Page 123 of 174

Page 124

consultation programmed for autumn 2025. The outcome of the PAN/PAC will lead to
a third and final road alignment design being concluded to allow for the submission of
the planning application. 
2.1.7 Following the submission of the PAN, the first round of statutory consultation will take
place on the dates and venues below: 
• Tuesday 17th June 2025 at Airdrie Library between 14.00 and 19:00
• Thursday 19th June 2025 at Chapelhall Library between 14.00 and 19:00
• Tuesday 24th June at Cumbernauld Library between 14.00 and 19:00 
2.1.8 The EALR project team and the councils’ consultants will be present during the above
times to discuss the link road proposal and address questions and comments.  These
in person consultation events will also be supplemented by an 8-week online
consultation from Monday 16th June to enable the information to be viewed and
feedback submitted online. 
2.1.9 In advance of the Pre Application Consultation, the EALR Project Team have updated
the Enterprise and Fair Work Committee on the 2 May 2025, briefed local members on
15 May 2025 and have attended the Cumbernauld Community Board (27 May 2025)
and Airdrie Community Board (4 June 2025). 
2.1.10 To support the design work and planning application, environmental surveys are taking
place across the extent of the proposed link road.  Additional ground investigation work
will take place over summer 2025 to confirm the final preliminary design particularly in
regard to structures and bridges.  It will also inform the construction methodology for
the link road and provide further certainty over construction costs and overall project
budget. 
2.1.11 As advised to the Enterprise and Fair Work Committee, this Committee will be aware,
that the council requires to acquire the land to construct the EALR.  As the road
alignment progresses and becomes fixed, this allows the land take required to be better
understood and for the land strategy to be developed and implemented.   
2.1.12 Given the scale and length of the EALR, the number of landowners is substantial and
the risk of acquiring all the land at the same time to build the entire link road is
considered to be of a level that will require a compulsory purchase order (CPO).   This
Committee is advised that it is the EALR project team’s intention to bring further
information back to the Enterprise and Fair Work Committee later this year on the
proposed land strategy including the potential for voluntary acquisition and CPO for the
EALR.  In time, a proposal for consideration and approval to promote a CPO for the
necessary land for the link road delivery shall be submitted to the appropriate
committee. 
2.1.13 As highlighted above in paragraph 1.6, the EALR will provide access to the Monklands
Replacement Hospital. An important element in managing the interface between the
two projects is programme alignment, minimising risk of delay to either the council or
NHS Lanarkshire and maximising the benefits that these two large scale infrastructure
schemes will generate.   
2.1.14 The EALR project team liaise with NHS Lanarkshire through regular technical meetings
and a Project Interface Board has been established to provide governance around
coordination, risk management, delivery efficiencies, and to maximise benefits and
Page 124 of 174

Page 125

outcomes. Through the continued partnership working with NHS Lanarkshire, a second
access to the hospital and a link to the EALR has been identified.   
2.2 Towers Road Link 
2.2.1 An additional access to the Wester Moffat site, the Towers Road link, has been
identified by the council and NHS Lanarkshire as an option that offers the Monklands
Hospital and the EALR significant benefits.  The proposed additional access is an
extension of the route from the hospital junction on the EALR and the approved internal
hospital road infrastructure to Towers Road near the junction with Varnsdorf Way, as
can be seen in figure 1 below.   
2.2.2 This link from Towers Road to the EALR offers additional construction access to both
projects, provides a corridor for some of the hospital’s public utilities but more
importantly, will create a second permanent direct route to the hospital for patients,
staff, public transport, active travel and emergency services and a valuable east west
link for the EALR to enhance the connectivity to the local road network.  The Towers
Road link also benefits the immediate local road network with road improvements to
Towers Road.  The link would divert hospital-related traffic away from other local roads
like Stepends Road or Roughrigg Road. 
Figure 1 – Proposed Towers Road Link and section of East Airdrie Link Road. 
Page 125 of 174

Page 126

2.2.3 Following consideration of this report by Committee, approval is sought for the
inclusion, in principle, of the second access in the EALR Project and for its inclusion
within the future planning application. There may also be an opportunity that the Towers
Road link and a section of the EALR from the Hospital junction to the A89 (Forrest
Street) could form the first phase of the road infrastructure delivery.  This could, subject
to planning consent and land acquisition, allow for these elements to be brought
forward and be constructed earlier than currently programmed. 
2.2.4 This early delivery could bring substantial advantages for access both to the hospital
site and the EALR site to aid construction but importantly derisks programme
challenges between the projects and has the added benefits of potentially reducing 
impacts of inflation on project costs.   
2.2.5 Following the outcome of the Pre Application Consultation and further feasibility and
design development, an update report will be provided to the Enterprise and Fair Work
Committee regarding the proposed inclusion of the Towers Road link within the scope
of the EALR to support effective and efficient delivery of both the EALR project and the
Monklands Replacement Hospital. 
3. Measures of success 
3.1 As Committee will be aware, as part of a North Lanarkshire City Deal Programme
review, the current construction timescales for the Pan Lanarkshire Orbital Transport
Corridor have been approved and are as follows (construction only): 
Pan Lanarkshire Orbital Transport Corridor: 
• Muir Street – January 2022 to June 2023 (complete) 
• Ravenscraig Access Infrastructure – March 2022 to March 2029 (no longer
including RAI N but including the reprofiling of Airbles Road) 
• East Airdrie Link Road – May 2028 to Sept 2030 
3.2  The Pan Lanarkshire Orbital Transport Corridor Programme and its sub projects have
been developed to ensure that at a North Lanarkshire level, North Lanarkshire’s
residents and businesses will directly benefit. As part of the business case process,
through the Economic Impact Assessment, outputs and wider benefits are identified
and are set out in a Benefits Realisation Profile.  The EALR Outline Business Case
identifies the economic impacts and quantifies and details when outputs will be
delivered and achieved as a result of the specific project investment. 
The EALR project will deliver direct benefits of -:
• Redistribution of strategic traffic from congested local road networks through
Chapelhall and Airdrie, to a new strategic road link. This will enable transport
efficiencies to be realised including journey time savings; improved journey
reliability; improved public transport reliability and improved safety for motorised
and non-motorised users. It will also enable continued improvement of air
quality standards within the Chapelhall area through reduced traffic volume and
congestion on the B799;
Page 126 of 174

Page 127

• Access and strategic road network capacity provided for the planned
Monklands Replacement Hospital at Wester Moffat, a key development within
the Airdrie area and a health care priority for NHS Lanarkshire; 
• Improved transport connectivity within the northern section of the Pan
Lanarkshire Orbital Transport Corridor;
• Improved connectivity by active travel between residential areas, local services
and facilities and employment opportunities. 
Indirect benefits will also be generated from the EALR Investment as set out in the
approved Outline Business case.
• Economic activity stimulated through investment in allocated residential and
commercial development sites in proximity to the East Airdrie Link Road
corridor, including at South Cumbernauld Community Growth Area. This will
lever in significant follow-on private sector investment, with associated further
one-off (construction) and continuous employment benefits; 
• Improved marketability and viability of long term stalled residential and
commercial development sites, particularly within the Plains area; 
• Improved access to employment opportunities, local services and facilities from
communities across the Airdrie area, with resultant employment benefits and
associated knock-on impacts including increased spend in the local economy,
a more economically active population; health and wellbeing benefits and wider
socio-economic benefits;  
• Construction of new active travel route infrastructure (shared use
footways/cycleways alongside main and secondary road networks) and
enhancement of existing cycle paths to current shared use standards.  
3.3  At the City Region level, from a public sector perspective, the EALR Project will
generate a positive return with a Public Sector BCR of 2.5. This means that for every
£1 of public sector money spent, £2.50 net additional GVA is generated in the City
Region. 
3.4 The benefits will be measured over a 10-year period, reporting as part of the GCR
Gateways until 2035.  Gateway 2, an onerous review of the completed GCR projects
and their outputs and outcomes has concluded successfully which allows for the next
5-year tranche of funding to be released.   
3.5 All North Lanarkshire City Deal contracts seek to maximise community benefits from
contracts awarded for the Project. Community Benefits will be secured through the
procurement of services and works in line with the City Deal Community Benefit
Strategy. The Community Benefits will be delivered through the design, planning and
implementation phases, through contracts directly awarded by North Lanarkshire
Council and where relevant, its partners. The Community Benefits menu within the City
Deal Community Benefits Strategy will be used to target benefits that support the
Council’s key aims and objectives and deliver against priorities.     
4. Supporting documentation  
Page 127 of 174

Page 128

4.1  No supporting documents. 
Pamela Humphries 
Chief Officer (Place) 
Page 128 of 174

Page 129

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The City Deal Cabinet has agreed that Inclusive Growth is to be fully embedded
within the GCR City Deal programme delivery and that it is also committed to
supporting the delivery of the Fairer Scotland Action Plan.  Future NLC subproject
OBC/FBC development will be scrutinised to ensure it meets the duties of the
Fairer Scotland Action Plan. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Following Enterprise and Fair Work Committee approval (May 2024) and GCR
Cabinet Approval on 6 August 2024, the revised North Lanarkshire Glasgow City
Region City Deal Programme is as follows: 
• Glenboig Link Road                                                         £6.2m
• A8/M8 Corridor Access Improvements
o Orchard Farm                                                          £2.2m
o Eurocentral Active Travel                                        £4.3m
• Pan-Lan Orbital Transport Corridor
o East Airdrie Link Road                                  £185.3m
o Muir Street                                                              £3.8m
o Ravenscraig Access                                               £74.2m
Infrastructure                                                            
• Total                                                                                   £276m 
This overall Programme is funded £149m by the GCR City Deal Infrastructure Fund
and £127m by North Lanarkshire Council. 
The East Airdrie Link Road Project budget is £185.3m.  This has been approved by
the Glasgow City Region Cabinet as part of the Outline Business Case. It will be
funded as follows: 
GCR City Deal Infrastructure Fund (86%)                                    £72.85m
Member Contribution (14%)                                                         £11.86m
North Lanarkshire Council                                                            £100.6m
Total                                                                                             £185.3m
Page 129 of 174

Page 130

In addition, a contribution from NHS Lanarkshire will be sought to cover the cost of
the EALR realignment to accommodate the Monklands Replacement Hospital. 
This approach has been agreed with NHS L and a funding agreement will be
prepared and will be incorporated into the Full Business Case for both the Hospital
and the Full Business Case for EALR in due course. 
It is currently projected that the additional costs of the inclusion of the Towers Road
link could be met from the project budget and the contribution from NHS
Lanarkshire.  This is subject to further design and cost assessment work. 
Expected cash flows up to 2028/29 for the wider City Deal programme, including
EALR are incorporated into the current strategic capital investment programme as
approved at Policy and Strategy Committee in March 2025. The cost modelling and
funding will be kept under continual review as the Council approaches the
development of the next 5-year strategic capital investment programme.  
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The City Deal Team work closely with Legal Services on all sub projects focusing
on land acquisition and CPO, procurement and contract preparation and
management, funding agreements and any other related matters. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒
Page 130 of 174

Page 131

If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
All infrastructure projects developed by the council as part of the GCR City Deal will
be subject to relevant environmental and sustainability appraisal and as part of the
design process and subsequent planning application approvals and procurement.   
Furthermore, to adhere with HM Treasury Greenbook best practice, each iteration of
project business case seeking GCR City Deal funding will include a review of the
sustainability considerations, this will include carbon management, involving
categorisation, assessment and mitigation. 
As part of the design of the EALR, a carbon management plan has been developed. 
This will continue to evolve through the design stages and in time with the delivery
of the link road, to fully understand and minimise carbon impacts and implement any
required mitigation and benefits.  This will also ensure that the long term
maintenance burden of the link road is minimised. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The City Deal programme and the delivery of the Project will continue to be
promoted through Corporate Communications and the Glasgow City Region’s
Communications team.   
In terms of East Airdrie Link Road, joint communication arrangements have been
put in place between NHS Lanarkshire and North Lanarkshire Council to coordinate
communication, stakeholder engagement and promote the projects as they
develop.   
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
A key risk for the City Deal Programme is the current global economic climate and
its short and long term impacts on the delivery of the city deal projects.  This risk is
becoming a live issue for the Programme and will be assessed and recorded within
the City Deal Issues Register. This is not unique to City Deal and the approach to
Page 131 of 174

Page 132

this risk and issue management will be carried out in conjunction with Finance and
the Glasgow City Region Project Management Office.   
Risk management of North Lanarkshire’s City Deal activity is incorporated within
the council’s City Deal programme risk register which is reviewed by the City Deal
Manager and reported to the council’s City Deal Board.   
The City Deal risks are also integrated in the Place Service Risk Register.   
Each City Deal sub project has a detail risk register and is managed by the Project
Manager. For East Airdrie Link Road, a joint Risk Register has been developed and
is co owned by NHS L and NLC.  Regular risk workshops take place to review and
manage joint risks between the Monklands Replacement Hospital and the EALR. 
The joint Risk Register is reported to the Project Interface Board. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 132 of 174

Page 133

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    UKSPF/SD Date 05/06/25 
UK Shared Prosperity Fund – Annual Update 2024/25 
From  Pamela Humpries, Chief Officer (Place)  
E-mail Weiry@northlan.gov.uk Telephone Yvonne Weir
07508 001238 
Executive Summary 
The UK Shared Prosperity Fund (UKSPF) provided £2.6bn of funding across the UK for
local investment up to 31 March 2025.  The North Lanarkshire allocation of UKSPF for this
period was £13,871,047, providing a mix of capital and revenue funding for projects across
the UKSPF’s three investment priorities: Communities and Place; Support for Local
Businesses and People and Skills, and an additional allocation for Multiply. 
In line with UK Government requirements, the Council has submitted quarterly reports
confirming the level of expenditure and the outputs and outcomes recorded and verified in
the previous quarter.  The final year-end report was submitted at the end of April 2025 and
reported a cumulative spend of £13,233,213 for projects. The UKSPF Investment Plan also
included an allowance for management and administration costs of up to 4%, which has
been claimed in full. 
The cumulative spend for the UKSPF Programme is therefore £13,788,054 representing
full spend for the North Lanarkshire programme. The balance of funds was allocated to 2
regional projects managed by GCR. In addition to the above, the overspend in Multiply
(£43,594) will also be reported and it is expected will be paid to North Lanarkshire from
underspend elsewhere in the GCR programme. 
As part of the UK Government’s Autumn Budget Statement presented to Parliament on
Thursday 30 October 2024, the Chancellor confirmed that UKSPF will continue for a Year
4 with a budget of £900m for the 12 month-period. The UKSPF allocation for North
Lanarkshire for 2025/26 is £6,034,163.   Proposals for the allocation of UKSPF for 2025/26
were developed by the UKPSF Board and were approved at Enterprise and Fair Work
Committee on 14th February 2025. 
Recommendations
It is recommended that Policy and Strategy Committee: 
(1) Acknowledges progress in implementing the Shared Prosperity Fund Investment Plan
and that the programme drew down its full funding allocation of £13,788,054. 
(2) Acknowledges the range of activity and outcomes that the UKSPF has supported over
the last three years as set out in section 3 of the report. 
Item 6
Page 133 of 174

Page 134

1. Background 
1.1 The UK Shared Prosperity Fund (UKSPF) provided £2.6bn of funding across the UK
for local investment up to 31 March 2025. The funding was split over three financial
years as follows: £400m for 2022-23, £700m for 2023-24 and ramping up to £1.5bn for
2024-25. All areas of the UK received a conditional allocation of funding based on a
funding formula rather than direct competition for the funds. A total of £212m was
allocated to Scotland (8.4% of the UK total). 
1.2 This report provides an annual update in relation to the North Lanarkshire Investment
Plan for the UKSPF which was approved by Enterprise, Growth and Fair Work
Committee in August 2022.  As reported previously North Lanarkshire’s investment
priorities, interventions, outputs and outcomes were submitted as part of the Glasgow
City Region (GCR) UKSPF Investment Plan on 1st September 2022 and were
subsequently approved by the UK Government on 5th December 2022. The North
Lanarkshire allocation of UKSPF was £13,871,047, providing a mix of capital and
revenue funding for projects across the UKSPF’s three investment priorities:
communities and place; support for local businesses and people and skills, and an
additional allocation for Multiply. A UKSPF Project Board, chaired by the Chief Officer
(Place) was established in February 2023 to oversee the UKSPF programme
implementation and to ensure that the appropriate governance and reporting
requirements are met. 
1.3 Annual reports presented to this Committee in March 2023 and March 2024, provided
a financial update on the 2022 – 2025 UKSPF programme and noted progress towards
achieving the outputs and outcomes. This report sets out the position at the end of the
end of the initial 3 year programme as at 31 March 2025 and an overview of the year 4
programme for 2025/26 which has recently been confirmed by the UK Government. 
2. Report 
2.1 As has been presented to Committee previously, the UKSPF Programme was delayed
in starting and the funding was subsequently reprofiled. The final approved distribution
of funds is set out in the table below: 
(3) Notes that a further update will be provided in Cycle 2 2026 regarding delivery of the
2025/26 investment plan. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work All Programmes of Work
Page 134 of 174

Page 135

Investment Priority
UKSPF
2022/23
UKSPF
2023/24
UKSPF
2024/25
TOTAL
UKSPF
Communities & Place £42,500 £795,427 £2,246,500 £3,084,427
Supporting Local Business £0 £837,624 £1,667,738 £2,505,362
People and Skills £136,000 £2,661,474 £3,072,976 £5,870,450
Multiply £47,027 £923,766 £802,181 £1,772,974
NLC Management/Admin
4%  £25,671 £203,841 £325,329 £554,841
GCR led regional projects £0 £64,492 £18,500 £82,992
TOTAL  £251,198 £5,486,624 £8,133,224 £13,871,046 
2.2  The North Lanarkshire UKSPF Programme covered 21 interventions, with a total of 29
individual projects delivered over the duration of the programme through to March
2025.  There was also a requirement for a minimum capital allocation of just under
£2.1m which was allocated to support a range of active travel improvements, increased
digital connectivity in community facilities and contributions to the redevelopment works
at the Watersports Centre, Strathclyde Park and The Time Capsule, Coatbridge. 
2.3 At the end of 2023/24, the UK Government confirmed underspend could be carried
forward into year 3 of the programme (2024/25). Financial spend in 2023/24 was
£3,492,196 resulting in the balance of £1,994,428 being carried forward into the
following year. At that point each intervention and the projects being delivered retained
the underspend to fund activities in 2024/25. 
2.4 Throughout the Programme, the UKSPF Board has overseen progress of individual
projects and ensured that delivery was on track. A number of projects encountered
recruitment or procurement challenges leading to delays in activity starting, but all
projects put in place mitigating actions to ensure that spend and progress towards
outputs and outcomes would still be achieved as planned. 
2.5 The UKSPF Board has delegated authority to approve financial changes both within
and between approved interventions. As the programme reached its conclusion in
March 2025, there was a need to move funds between interventions to maximise the
funding drawn down by the Council. As a result, full spend was achieved as outlined in 
Appendix 1 of this report.
Reporting to GCR and UK Government 
2.6 The UK Government require formal reporting on a 6-monthly basis at the end of
September and the end of March each year. This includes detailed questions about
projects, outputs, outcomes and expenditure. The reports submitted to the UK
Government relate to the regional investment plan, with information from the 8 member
authorities submitted to the Glasgow City Region (GCR) Programme Monitoring Office
(PMO) and thereafter collated into a GCR report that is considered by the Finance
Strategy Group and approved by the GCR Cabinet prior to submission. 
Page 135 of 174

Page 136

2.7 The final year-end report was submitted at the end of April 2025. Based on the spend
noted in Appendix 1 the year end return to GCR/UK Government reported a cumulative
spend of £13,233,213 for projects. The UKSPF Investment Plan also includes an
allowance for management and administration costs of up to 4%, which has been
claimed in full - £554,841. 
2.8 The cumulative spend for the UKSPF Programme is therefore £13,788,054
representing full spend for the North Lanarkshire programme. The balance of funds
was allocated to 2 regional projects managed by GCR.
2.9 In addition to the above, the Multiply overspend will also be reported and it is expected
this will be paid to the council from underspend elsewhere in the GCR programme. 
Evaluation 
2.10 The Council was invited to take part in 2 evaluation studies as part of its UKSPF
delivery. The first is an intervention level evaluation exercise looking at how business
support activities have been delivered in 4 areas across the UK. North Lanarkshire,
along with Cardiff, Cornwall and Northern Ireland have taken part in the evaluation
which has involved a review of business grants including interviews with staff
administering the grants and a survey of businesses who have applied for support. The
evaluation is currently in the final phase of gathering information and the report should
be circulated in the autumn. 
2.11 The second evaluation is a place based evaluation looking more widely at the Glasgow
City region programme. This has involved looking at the management and delivery of
the UKSPF programme at a regional level, complemented by a more detailed look at a
sample of individual projects delivered by member authorities. For North Lanarkshire
the project selected was the Expert Help provision and as above will involve a review
of the service and a survey of businesses who have applied for support. 
UKSPF 2025/26 
2.12 As part of the UK Government’s Autumn Budget Statement presented to Parliament on
Thursday 30 October 2024, the Chancellor confirmed that UKSPF will continue for a
Year 4 with a budget of £900m for the 12 month-period. The UKSPF allocation for North
Lanarkshire for 2025/26 is £6,034,163.  
2.13 Proposals for the allocation of UKSPF for 2025/26 were developed by the UKSPF
Board and were approved at Enterprise and Fair Work Committee on 14th February
2025. The distribution across the investment themes approved at Committee is set out
in the table below with the allocation to projects under each of the priority themes and
subthemes provided in Appendix 2, including the allocation of 4% of the programme to
meet management and administration costs. 
 
Priority   Year 4 Allocation 
Capital (Communities and Place)   £1,405,960  
Communities and Place   £485,000  
Local Business Support   £1,015,000  
People and Skills   £2,886,837   Multiply  
Management and Administration   £241,366
Total £6,034,163
  
Page 136 of 174

Page 137

2.14 As 2025/26 is seen as a transition year, most projects are continuing with similar
activities to those supported in the 2022-25 period, albeit on a reduced basis to reflect
the lower level of funding available. As with the original programme there is a
requirement for a minimum capital spend which has been confirmed as £1,408,699.
This will be allocated to support the redevelopment of The Watersports Centre at
Strathclyde Country Park. 
3. Measures of success 
3.1 The UKSPF Investment Plan initially set out targets across a range of outputs and
outcomes and progress towards these is reported as part of each 6-month report. To
date output/ outcome reports have been submitted up to the end of September 2023,
March 2024 and September 2024. These reported primarily on progress against many
of the outputs as it was still early in the delivery of most interventions to be able to
achieve and record outcomes. 
3.2 The year-end report submitted to GCR at March 2025 provided the latest position in
relation to outputs and outcomes. The progress towards meeting output and outcome
targets continues to be variable due to the recent completion of capital projects and the
time lags for the achievement of outcomes in many of the interventions which are
recorded between 6 months and a year after the support has been provided. 
3.3 Of the 30 outputs and outcomes approved across the communities and place theme,
15 have been fully achieved at the end of March 2025, with most of the others making
good progress. Highlights include: 
• 235 organisations received grants to support local and volunteering projects, with
a further 82 organisations receiving non-financial support
• 44 local amenities or facilities have been improved, including 30 with improved
digital connectivity
• 2km of cycleway have been created to support active travel
• 164 volunteering opportunities have been created 
3.4 Under local business support, more demand for growth grants which are for a higher
level of funding led to fewer grants being awarded overall. Despite this, 4 out of 9
outcomes have achieved their target with further reporting expected for those grants
only completing activity at the end of the programme. Key highlights include: 
• 199 enterprises receiving grants, with a further 302 receiving non-financial support
• 161 potential entrepreneurs assisted to be business ready
• 28 new enterprises created as a direct result of support
• private investment of £1,657,280 levered in to support activities
• 17,172 additional visitors making use of improvements to amenities and facilities
supported through the Tourism Challenge Fund 
3.5 The people and skills theme has seen investment in pilot activities to support
particularly vulnerable groups alongside continuing employability activity. In particular,
UKSPF has funded programmes to support vulnerable young people in vocational
training areas to increase their opportunities on leaving school. The outcomes for this
theme take longer to come to realisation and will continue to be gathered and reported
in 2025/26, but highlights include the following: 
• 165 economically inactive individuals have engaged with keyworker support
Page 137 of 174

Page 138

• 213 young people have been supported to take part in work experience
programmes
• 1,525 individuals have been supported to complete a course or gain a qualification
• 1,194 people have been supported into employment
• 886 individuals have engaged in development of life skills, including digital skills 
3.6 The intention of the Multiply interventions has been to engage with learners and to
increase their confidence in using numbers, particularly where this is creating barriers
for the individual in everyday life. Engagement activities have been very successful, but
most of the beneficiaries have not yet reached the level of achieving formal Maths
qualifications. The key highlights are: 
• 1842 people have participated in Multiply courses
• 191 adult numeracy courses have been run in local areas
• 292 adults have achieved a maths qualification up to SQA level 5 
3.7 To illustrate the impact that UKSPF has made, appendix 3 includes stories from the
individuals benefiting from four of the UKSPF projects. 
4. Supporting documentation 
4.1 The UKSPF prospectus can be viewed at:  UK Shared Prosperity Fund: prospectus -
GOV.UK (www.gov.uk) 
4.2 UK Shared Prosperity Fund 2025-26: Technical Note can be viewed at: UK Shared
Prosperity Fund 2025-26: Technical note - GOV.UK 
4.3 A link to the GCR Investment Plan summary can be viewed at: UK Shared Prosperity
Fund Investment Plan (glasgowcityregion.co.uk) 
4.4 UK Shared Prosperity Fund – Update, Policy and Strategy Committee, 14th March
2024 - Document.ashx 
Appendix 1:  North Lanarkshire Investment Plan Projects – final spend position 
Appendix 2: Shared Prosperity Fund Allocations 2025/26  
Appendix 3:  Case Studies 
Pamela Humphries
Chief Officer (Place) 
Page 138 of 174

Page 139

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The overall aim of the UKPSF is to build pride in place and increase life chances.
The impact will therefore be positive across a number of equality groups with many
projects targeted as particularly vulnerable groups. A full EQIA has been
completed. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The UKSPF has brought in just under £14m investment into North Lanarkshire to
date with a further £6m allocated for 2025/26 - be distributed across the investment
themes of communities and place, local support for businesses and people and
skills. An Assurance Framework has been approved to provide guidance for project
officers delivering UKPSF funded activities to ensure appropriate compliance and
verification is in place. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
A number of projects have recruited additional staff on temporary contracts. Each
Service will/has discussed people resource requirements with the relevant contacts
and sought approvals as necessary. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Page 139 of 174

Page 140

A grant offer letter and passdown agreement for the UKSPF is in place between
Glasgow City Region (as lead authority for the investment plan) and North
Lanarkshire Council. The current passdown agreement will be updated to March
2026 following receipt of the grant offer letter for 2025/26 from the UK
Government. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☒ No ☐  
A DPIA and Privacy notices are in place for UKSPF interventions where required. 
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
There is a requirement to acknowledge that activities supported through the
UKPSF are funded or part funded by the UK Government. Branding guidelines
have been made available to all project leads and Corporate Communications
Team are available to provide advice and guidance. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed?
Page 140 of 174

Page 141

Management of the UKPSF is following the Council’s project management
framework and a position risk assessment has been undertaken and a risk and
issues log developed to support management of the programme. This is reviewed
by the UKSPF Board at least 6 monthly. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
UKSPF will deliver an education and skills programme of activities targeted at
vulnerable young people preparing to leave school. This will build on the existing
provision in place to support those with additional support needs and through the
Pathways programme with a specific focus on vocational training and life skills. 
This will contribute to Article 29 – goals of education. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 141 of 174

Page 142

Appendix 1: North Lanarkshire Investment Plan Projects – final spend position  
Project Spend – Communities and Place 
Project   Spend to Mar 2025
S2 – Strathclyde Park Watersports Centre  400,000 
S5 – Bellshill Pump Track Lighting  42,500 
S5 – Community Facilities  727,237 
S6 – Ravenscraig Active Travel Project  250,000 
S6 – Active Travel Projects  299,514 
S7 – Tourism Campaigns  109,281 
S8 – Volunteering Hub  211,068 
S9 – Community Funds  702,765 
S10 – Fuel Poverty  120,000 
S11 – Feasibility Studies  86,500 
S12 – Digital Connectivity Challenge Fund  135,562 
TOTAL  3,084,427 
Project Spend – Local Business Support 
Project   Spend to Mar 2025
S14 – Tourism Challenge Fund  86,545 
S15 – Business Grants  £1,298,499 
S15 – Smart Hub Lanarkshire  £233,261 
S19 – BAME  £142,210 
S19 – Women in Business  £146,459 
S20 – Expert Help  £212,878 
S20 – Net Zero Challenge Fund  £190,637 
S22 Social Enterprise Support  £194,873 
TOTAL  £2,505,362 
Project Spend – People and Skills 
Project   Spend to Mar 2025
S31 – Employability Support  748,378 
S35 – North Lanarkshire’s Working  2,874,916 
S35 - Young Adult Offer  65,915 
S36 – Built Environment Skills Academy  728,027 
S38 – Digital Skills Academy  469,737 
S39 – Enhanced Pathways  449,436 
S39 – Enhanced Additional Support Needs Provision  306,363 
S39 - In-school Pathways  227,682 
TOTAL  5,870,454 
Project Spend – Multiply 
Project   Spend to Mar 2025 
S42 – Integrated Maths in the Community  1,537,508 
S49 Financial Literacy programmes  279,055 
TOTAL  1,816,563 
  
Page 142 of 174

Page 143

Appendix 2 - Shared Prosperity Fund Project Allocations 2025/26  
  
Communities and Place  
Thriving Places – development of visitor economy  
Visitor Campaigns – Visit Lanarkshire   40,000  
Healthy, Safe and Inclusive Communities – improve health and wellbeing  
Watersports Centre, Strathclyde Country Park (capital)  1,408,699 
Impactful Volunteering – Volunteer NL   85,000  
Healthy, Safe and Inclusive Communities – bringing communities together  
Investment in Capacity Building – Community Empowerment NL   360,000  
  
  
Local Business Support  
Advice and Support to Businesses  
SME Development Grants and Support – Small Business Grants   75,000  
SME Development Grants and Support – Business Growth Grants   572,260  
SME Development Grants and Support - Smart Hub Lanarkshire   50,000  
Expert Help   175,000  
Enterprise Culture and Start up Support  
Strengthening Entrepreneurial support – BAME Entrepreneurs   50,000  
Strengthening Entrepreneurial support – Female Entrepreneurs   50,000  
Social Enterprise Support   40,000  
  
  
People and Skills  
Supporting people to progress towards and into employment  
North Lanarkshire’s Working   1,568,837  
Support for young people who are or at risk of being NEET  
Vocational training support for vulnerable leaving school   250,000  
Employment Related Skills  
NL Built Environment Academy   230,000  
Essential Skills (including numeracy, literacy, ESOL and digital)  
NL Digital Skills Academy   224,000  
Multiply - Sum it Up   496,000  
Multiply - Managing Your Money   118,000  
  
  
Management and Administration (4%)   241,367  
  
  
    
Page 143 of 174

Page 144

Appendix 3 - UKSPF Case studies 
S8: Volunteering NL  £211,068 
Support to develop and enhance volunteering opportunities in North Lanarkshire. The
project sought to engage volunteers across a range of roles within NLC and offer wider
support to volunteers operating in voluntary and community groups through a Volunteer
Hub. Some funding each year was distributed to local groups through a challenge fund. 
Page 144 of 174

Page 145

Page 145 of 174

Page 146

S12: Digital Connectivity  £135,562 
UKSPF provided capital investment for digital infrastructure in community facilities across
North Lanarkshire. Part of the funding supported enhancing public Wi-Fi in 21 NLC
community facilities with a complementary programme delivered through a challenge fund,
providing grants directly to community groups managing their own facilities. The third
element was to fund the equipment to develop the immersive space at Airdrie Library. 
“The Digital Connectivity Fund award has also helped further our Digital
Inclusion group to include more people and to allow us to expand our days.
This has become a vital service for the local community.” 
The problem
•Groups using the facility rely on the IT infrastructure to serve the community and cannot run their
groups successfully with the current digital provision at the centre.
•The aging IT infrastructure is no longer able to handle the daily high demand required.
Benefits of funding
•Funding will allow the centre to run and develop their current groups and expand to include more
users.
•Now able to offer community groups more days within ONC that will attract further members
benefitting the wider community.
•Local community groups could incorporate the new upgraded technology as part of the groups
services, offering a wider range of activities available.
Result of Digital
Connectivity
funding
•An award of £4819.97 for the installation of wireless access points and the sufficient cabling and
associated technology.
•Improved infrastructure has resulted in a better quality of connectivity for local groups and
partnership agencies where digital connection is crucial for the community.
•Essential groups such as Men's Group can include digital and online activities to support
Dementia patients with memory stimulus etc.
Page 146 of 174

Page 147

S15: Business Grants  £1,298,499 
The business grant funds supported the establishment and growth of new and existing
businesses in North Lanarkshire, complementing the wider business support available
through the Enterprise Development Team and Business Gateway. Delivery was through 3
schemes aimed at start-up businesses, small and self-employed businesses and the
business growth fund. 
A Business Growth Fund grant of £27,984 enabled AquaTitans to create a purpose-
built workspace and storage in their Cumbernauld premises to service new contracts. 
The company specialises in the design and production of electrical equipment and
components for submersibles, including specialist fabrication, machining and tooling,
electrical testing and rapid prototyping. 
The new facilities are allowing the business to expand into work on new and innovative
submersible build projects. This will help increase turnover by up to £3million over the next
two years and create at least two extra full-time high-skilled engineering positions. 
By improving overall efficiency and competitiveness, the workspace will likely lead to other
future contract opportunities from global submersible operators. 
As part of the Business Growth Fund community benefits agreement, AquaTitans will offer
work experience opportunities for local young people, provide mentoring support to other
SMEs and microbusinesses in supply chain opportunities, and support business-education
partnerships. 
Alongside the grant funding, the company is also accessing Business Gateway Lanarkshire
support via the Growth Advisory Service. This has included fully funded consultancy support
through the Expert Help programme to work on the business strategy.    
Alan Green, Director of AquaTitans, said: “The infrastructure improvements, completed with
support from the Business Growth Fund, have had a transformational impact on our in-house
production capabilities. We have several projects underway and this is an important step in
the evolution of AquaTitans.” 
Page 147 of 174

Page 148

S31: Working Matters  £748,378
The Working Matters programme provided place based employability support for
economically inactive residents of North Lanarkshire with intensive and wrap-around
support to move those furthest from the labour market closer to mainstream provision and
employment, supplemented by additional and/or specialist life and basic skills. 
Donna’s Story 
By her own admission, Donna is shy.  Through the S31 Working Matters project she was
able to access Routes To Work’s BOOST events and regular keyworker support and she
quickly came out of her shell to take on the role of “leader of the gang”. 
Donna, from Coatbridge, knew she needed support with her mental health, motivation and
some issues surrounding anger and frustration. She had been economically inactive and out
of work for 10 years. Attending the BOOST events - which took place every Wednesday for
four weeks at the Time Capsule - Donna’s confidence quickly improved. 
She said: “I had a great interaction with everybody, the group was great. At the beginning,
everyone was dubious to go in because you didn’t know anybody, but when we all got in and
found out a bit more about what it’s about as our Keyworker Eddie explained it all to us. It
was really insightful. 
“I did mindfulness, an anxiety workshop and wellness. We covered loads and loads of stuff.
We had somebody from North Lanarkshire Council in and found out about different events
and courses that were coming up. It helped me with my temper, anxiety and frustration. It
gave you that wee inlet to stop and think before you react. There’s always a positive out of a
negative.” 
Local partners like North Lanarkshire Leisure and the NHS North Lanarkshire Mental Health
team were also brought in to discuss topics like physical fitness, anxiety and holistic therapy.
Donna’s mental health and anger issues abated, and she worked on her physical health with
a gym membership. Donna also undertook a REHIS qualification in emergency first aid at
work and within a week - remarkably - she saved her neighbour’s life. Donna was also
supported with looking at jobs within the care sector which would fit around the support she
provides to her mother. 
She added: “I think everybody’s noticed a change in me. I’ve got more confidence, I’m not
as, like, held in. I can talk about stuff better rather than not wanting to talk. Now I can do it
because I want to. Through the support given by Eddie and Routes to Work, I feel my
employability skills have improved, and my goal is that once I’ve got my health in order, to
get a full-time job.” 
Page 148 of 174

Page 149

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT Date 05/06/25 
Accounts Commission Briefing – Local Government Budgets
2025/26 
From  Greg Telfer, Chief Officer (Finance & Technology)  
E-mail telferg@northlan.gov.uk Telephone 07583 010692 
1. Background 
1.1 Audit Scotland has prepared the briefing on behalf of the Accounts Commission to
summarise key information arising from an analysis of the 2025/26 budgets recently
agreed by Scotland’s councils. 
Executive Summary
The Accounts Commission published its annual briefing note on local government budgets
on 22 May 2025. This is an important independent document summarising the state of play
for local government finances. 
The report highlights that despite record Scottish Government funding for local government
in 2025/26, councils continue to face recurring pressures in excess of funding uplifts, such
as inflation, annual pay deals and growing demand for services. The report states that
increased funding is largely in support of previously agreed national commitments. At the
time of setting budgets councils collectively identified a budget gap of £647 million in
2025/26 requiring increasing to Council Tax, savings, use of reserves and increasing
charges for services to set balanced budgets.   
The report provides a number of Accounts Commission expectations in the presentation of
budget information to elected members and residents. The Council will continue to ensure
budget information meets those expectations. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Reviews and acknowledges the content of the report and the Accounts
Commission’s briefing note on local government budgets for 2025/26.
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 7
Page 149 of 174

Page 150

1.2 The information has been gathered following a data capturing exercise across all
councils including gathering information on budget gaps, how budget gaps have been
mitigated, fees and charges, and any savings implemented. 
1.3 Members will recall that the Council set its budget on 20 February 2025 with an
approved Council Tax rise of 10% which meant that no additional savings were required
to balance the budget.  
2. Report 
2.1 The Accounts Commission briefing note can be accessed on the following link: Briefing:
Local government budgets 2024/25 
2.2 Key messages include:
• Despite funding for local government increasing by 6% in real terms, councils
continue to face recurring cost pressures in excess of funding uplifts, including
inflation, pay (including employer’s National Insurance contribution rates) and
growing demand for services. The report also highlights that most of the increased
settlement will be used to deliver previously agreed national commitments rather
than cost pressures faced by councils.
• When settling their budgets councils collectively identified a difference of £647m
between anticipated expenditure and funding and income they will receive. A range
of actions have been identified to close this budget gap including Council Tax rises,
savings, use of services and increasing charges for accessing services. 
• Despite continuing to make savings year on year to address financial challenges,
councils still forecast more will need to be done to achieve financial sustainability
given the ongoing projected increases in costs and increases in service demand. 
2.3 The Accounts Commission has made a number of expectations of councils in relation
to the availability of information being publicly available within budget papers. They
expect councils to clearly set out:
• The annual revenue budget, comprising funding and income, prior to savings and
other bridging actions,
• The associated budget gap, prior to bridging actions such as savings and use of
reserves,
• The savings plan, clearly setting out the split between recurring and non-recurring
actions,
• Projected revenue budget gaps, both annual and cumulative, and 
• The assumptions used in calculating projected budget gaps. 
2.4 The Council’s approach to determining its anticipated budget gap through the Medium
Term Financial Plan, further Financial Outlook updates and the production of the annual
budget report in February each year provides all this information to both elected
members and residents of North Lanarkshire. 
3. Measures of success 
3.1 The Council’s overall budget strategy will ensure solutions are developed aligned to the
Council’s strategic objectives outlined in the Plan for North Lanarkshire.
3.2 Information presented to elected members during the budget process will support the
delivery of a balanced budget for 2026/27 and beyond. 
Page 150 of 174

Page 151

4. Supporting documentation 
4.1 Accounts Commission Briefing: Local government budgets 2024/25 
Greg Telfer
Chief Officer (Finance & Technology) 
Page 151 of 174

Page 152

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 152 of 174

Page 153

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 153 of 174

Page 154

Page 154 of 174

Page 155

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  GT/VR/FC Date 05/06/25 
5 Year Medium Term Financial Plan 2026/27 to 2030/31 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone   
Executive Summary
This report provides an update on the five-year medium term financial forecast to 2030/31,
which will be kept under review with further updated Financial Outlooks reported in line
with the Revenue Budget Framework outlined in the report. The report outlines the
challenges faced by the Council in maintaining medium term financial stability, whilst
achieving the strategic priorities of the Council. 
Taking the approved 2025/26 budget as the new baseline, this plan updates on the key
financial planning assumptions focussing on those factors which have the greatest
potential to impact the Council’s forecast financial position in the medium term. This
includes future revenue grant funding, pay and non-pay inflation. A range of risk-based
scenarios have been considered, resulting in envisaged, pessimistic and optimistic
positions, as set out in Appendices 1 to 3. Whilst the envisaged scenario remains the most
appropriate for planning purposes, it is important to note the budget gap range, reflecting
other potential scenarios the Council may face. 
Table 1 below includes the optimistic and pessimistic scenarios and demonstrates the
volatility and the extent of the fluctuation possible over the period of this plan. The summary
forecast envisaged position, indicates a budget gap of £136.927 million over the planning
period and £85.949 million for the three-year budget period, 2026/27 to 2028/29. 
Reflecting the other planning scenarios, the budget gap is estimated to range between
£64.852 million and £263.691 million over the five-year period, and £42.034 million and
£157.487 million over three years. This position is prior to any consideration of Council Tax
increases, additional savings or other potential solutions to manage the position. 
Item 8
Page 155 of 174

Page 156

1. Background  
1.1. Members will appreciate longer term planning is integral to the Council’s Financial
Strategy and the strategic approach to budgeting. Effective decision making relies on
robust financial planning and the Medium-Term Financial Plan (MTFP) assists in
ensuring resources are aligned to the key priorities outlined in The Plan for North
Lanarkshire are affordable and sustainable.   
1.2. The MTFP reflects the financial risks that may impact on the Council’s ability to continue
to provide high quality services focussing on the strategic priorities, whilst balancing
the budget. Therefore, this plan continues to consider a range of scenarios and
highlights the associated forecast budget position. Taking the 2025/26 approved
budget position as the new baseline, key financial planning assumptions have been
reviewed and updated and are reflected in this plan. A range of risk-based outcomes
continued to be modelled highlighting optimistic, envisaged and pessimistic scenarios.   
1.3. The two main variables with the greatest potential to impact the forecast financial plan
and the Council’s ability to set a balanced budget are the level of funding provided by
the Scottish Government and pay inflation. The latest Economic Forecast by the Office
for Budget Responsibility (OBR) anticipates that whilst inflation will rise during 2025, it 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Approves the updated Medium Term Financial Plan 2026/27 to 2030/31.
(2) Recognises this plan will be subject to ongoing review with updates reported as
outlined in the Revenue Budget Framework. 
(3) Acknowledges the Revenue Budget Framework to manage the three-year forecast
financial position outlined in the MTFP, which will facilitate the identification of
sustainable solutions by the Council in meeting its statutory obligation to set a
balanced budget.
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work All Programmes of Work
Table 1
Financial
Year
Budget Gap
Optimistic
£000
Budget Gap
Envisaged
£000
Budget Gap
Pessimistic
£000
2026/27 17,201         34,638         53,675        
2027/28 12,750         25,956         51,568        
2028/29 12,083         25,355         52,245        
2029/30 12,592         26,063         53,832        
2030/31 10,226         24,915         52,372        
Total 64,852         136,927       263,691      
3 Year Gap 42,034         85,949         157,487      
Page 156 of 174

Page 157

is expected that it will fall back to target of 2% from 2027 on the basis that energy prices
decline, food inflation decreases and wage growth settles.     
1.4. This plan continues to recognise the risks and volatility in forecasting the potential
financial implications. Therefore, whilst the envisaged scenario remains the most
appropriate for planning purposes, the budget gap range across the potential scenarios
demonstrate the volatility and the extent of the fluctuation possible over the period of
the plan.     
1.5. Continuing practice in previous years, the MTFP budget gap excludes the anticipated
cost pressures in relation to Adult Health and Social Care (AHSC) and the Housing
Revenue Account as the IJB and HRA continue to prepare and develop their own robust
financial plans and budget strategies to support their financial sustainability over the
medium term. However, to ensure ongoing Elected Member visibility of the pressures
facing AHSC this paper includes a high-level summary of the most recent financial plan
approved by the IJB. 
1.6. The HRA has aligned their financial planning processes with the Council’s, introducing
a rolling 5 medium term financial plan in 2024/25. This outlines the challenges faced by
the HRA in maintaining medium term financial sustainability whilst achieving its desired
service ambitions.   
1.7. The IJB approved their MTFP 2025-2028 including the Long-Term Outlook 2025-2035
in March 2025. This highlighted the importance of IJB focusing on the longer-term
financial challenges and to generate reserves where appropriate to assist in managing
required savings and service redesign, ensuring the needs of service users and their
families are met. The Council’s Section 95 officer and the Chief Finance Officer (Section
95 Officer) of the IJB continue to work closely to ensure the Council has oversight of
the financial position and work towards aligning budget strategies and planning periods.   
1.8. It should be noted that a five-year medium-term plan continues to remain reasonable
and appropriate for financial planning purposes. 
1.9. A Revenue Budget Framework to support the delivery of a balanced budget for 2026/27
is also provided. 
2. Report 
2.1 The previous MTFP approved by this Committee in June 2024 indicated a three year
gap for the period 2026/27 to 2028/29 of £59.484 million (2026/27, £21.320 million,
2027/28 £19.095 million and 2028/29 £19.433 million). This position is updated for the
approved 2025/26 budget decisions along with other relevant key changes, whilst
recognising the impact these may have on the demand for services, resources, and
other cost pressures. 
2.2 Appendices 1 to 3 provide summaries for three planning scenarios across the five year
planning period, highlighting the anticipated budget gap for the three year budget
period 2026/27 to 2028/29. Whilst three planning scenarios have been presented
reflecting sensitivities and volatility in forecasting, the remainder of this report primarily
focuses on assumptions in relation to the envisaged scenario. These are outlined
below, with a summary of the movements since the previous plan provided at Appendix
4.   
Forecast Resources 
Page 157 of 174

Page 158

2.3 The largest element of the Scottish Budget is the Scottish Block Grant provided by the
UK Government through the Barnett formula. The UK Spending Review is the process
by which the UK Government sets out its plans for public spending. This provides vital
information for the Scottish Government’s planning assumptions and budget. The
Spring Statement in March 2025 provided an update on the economy. Based on the
Office for Budget Responsibility (OBR) forecasts, inflation is expected to be higher than
previously projected during 2025 with a gradual return to the Bank of England’s target
of 2% by 2027. Whilst no date has been set for the next spending review, it is expected
to take place in the Autumn. 
Aggregate External Finance (AEF) 
2.4 The Council’s revenue funding consists largely of government funding, Aggregate
External Finance (AEF) equates to approximately 83% of total funding and is made up
of General Revenue Grant based on the Scottish Government’s assessment of overall
spending needs, Specific Grant and Non-Domestic Rates Income. 
2.5 Estimating future years’ funding with any degree of certainty is challenging, and a slight
variation on funding level can have a significant impact (1% equates to more than
£9.000 million) on the Council’s forecast financial position. 
2.6 The Scottish Government published its Resource Spending Review in May 2022, which
set out high level parameters for future Scottish budgets up to 2026/27. This confirmed
a flat lining of resource funding for Local Government at 2022/23 levels, to 2025/26,
with a small increase forecast in 2026/27. In addition, in May 2023, the Scottish
Government published its updated Medium-Term Financial Strategy (MTFS) for the
period from 2023/24 to 2027/28, providing insight to future funding and spending
priorities at a national level. Whilst there was no update to the MTFS in 2024, the
Cabinet Secretary for Finance and Local Government has also now confirmed that the
2025 MTFS update and accompanying Fiscal Sustainability Delivery Plan (FSDP) will
be delayed until 23 June. However, based on the most likely scenario, the most recent
version of MTFS available indicates increasing taxation, block grant and other
revenues over the period to 2027/28, funding is not forecast to keep pace with
expenditure demands. Therefore, it is anticipated that the Scottish Government will
continue to have to make difficult and prioritised spending decisions across the full
period covered by their MTFS. Given that Local Government is unlikely to be prioritised
as part of the Scottish Government’s budget decisions, there is an increasing risk to
the previous flat cash commitment. 
2.7 Nonetheless, there is no clarity over this position nor the funding at individual Council
level, or whether this funding will come with additional spending commitments. In the
absence of any further updates this plan continues to assume a flat lining of
government funding.  All three scenarios have been re-baselined to reflect the 2025/26
AEF as reported in the approved 2025/26 budget and updated for subsequent finance
circular movements. The envisaged scenario assumes no movement in the re-
baselined 2025/26 core grant for the duration of this plan. The optimistic and
pessimistic scenarios have been flexed to 1% increase/decrease respectively.   
2.8 It should be noted that when allocating grant funding to Local Government, the Scottish
Government makes assumptions about growth in income from Council Tax, and
adjusts grant funding allocations, accordingly. This plan assumes the expected flat
cash commitment is net of such adjustment. In addition, historically the Scottish
Government provided Local Authorities with support for loan charges and PPP
Payments for borrowing undertaken in lieu of large capital grants. However, there are
no new loans covered by this process and as principal and interest repayments reduce,
Page 158 of 174

Page 159

the support provided by Scottish Government through the General Revenue Grant also
reduces. This plan, however, assumes that the overall Local Government quantum will
remain static therefore any reduction in loan charges and PPP support will be
redistributed across all 32 Local Authorities.  Based on the council’s average share of
funds it is anticipated that over the term of this plan there will be a net gain of £8.570
million. There is, however, a risk that this funding could be diverted out with the Local
Government portfolio and therefore the position will continue to be monitored, and any
impact reported in future financial outlook papers. 
Council Tax 
2.9 Income from Council Tax accounts for around 17% of the Council’s revenue resources
with the estimated income based on a combination of Band D equivalent value,
householder base and the expected rate of collection. 
2.10 In setting the 2025/26 budget, members acknowledged the Council Tax Strategy report
taken to Policy and Strategy Committee on 5 December 2024 highlighting that North
Lanarkshire had the 5th lowest Band D charge across the 32 local authorities. As a
result, the Council took the decision to approve a 10% increase to Council Tax, resulting
in an increased Band D charge of £1,452.86. The Council also agreed to set aside 2%
of the Council Tax increase for additional capital investment through the Community
Investment Fund. This plan assumes that in line with the Council Tax Strategy report,
that this will be committed for 3 years from 2025/26 to 2027/28 and return to 1%
thereafter. This provides £14.154 million of additional resources over the five year
planning period and £9.823 million over the 3 year budget period. 
2.11 In addition to the increase in Council Tax rates noted above, it is also anticipated that
additional income will be generated as a result of household growth. This is expected
to generate an additional £3.072 million of Council Tax income in 2026/27, and £13.546
million over the course of the planning period. This includes assumed additional income
from household growth ringfenced for the CIF programme of £8.604 million. 
Use of Reserves / Resources 
2.12 The principles linked to the Revenue Budget Strategy continue to allow for prudent and
sustainable use of balances to support multi-year budgeting and help smooth budget
gaps, in accordance with the Reserves Policy. This also provides for the Change
Management Fund which is necessary to support the one-off costs of approved budget
savings to enable a more strategic and sustainable approach to managing the
challenging budget position, allowing time to develop and implement recurring savings.   
2.13 This plan recognises the reversal of the 2025/26 one-off use of reserves approved to
offset any additional cost arising from the increase to employers national insurance up
to £4.400 million. Since the Council meeting, further calculations have indicated that
the cost to the Council is lower than first anticipated, this combined with a higher than
expected share of Scottish Government funding has resulted in a reduced call on one
off use of reserves of £2.341m. In addition, one of use of reserves (£1.730 million)
approved to offset the increased pressure on Council Tax Reduction Scheme as a
result of the 10% Council Tax increase has reversed within the 2026/27 position.   
Forecast Expenditure & Income Generation 
Employee Cost Pressures 
Page 159 of 174

Page 160

2.14 Employee costs remain the largest single element of the General Fund budget,
accounting for a significant proportion of the General Fund budgeted expenditure in
2025/26. Cost pressures linked to the workforce are therefore material and a key
variable which has the potential to impact significantly on the forecast plan. Information
on the 2025/26 pay negotiations, as well forecast future employee cost pressures is
outlined below. 
2.14.1 Pay Award 2025/26 
• As negotiations in relation to the 2025/26 pay award are ongoing there remains a
real degree of uncertainty in relation to the total cost of any agreement to be borne
by Local Authorities. As a result, no change has been made in relation to these
costs from that presented in the most recent outlook presented to Council in
February 2025. There is potential that COSLA will expect parity with offers made
elsewhere in the public sector including the offer made to NHS staff of 8% over two
years. However, the expectation is that the Scottish Government would provide
necessary funding to support an increased offer.  Crucially though, any agreement
for 2025/26 pay award has the potential to impact the baseline position used to
forecast the cost from 2026/27 onwards. Therefore, this will be kept under review
as the negotiations progress and an update will be incorporated into a future
Financial Outlook, as required. 
2.14.2 Pay Award – Future Years Summary 
• For the period of this plan, future pay awards are based on the Council funding an
increase of 3%, reflecting the Public Sector Pay agenda of 9% over 3 years to
2027/28. A total provision of £19.600 million is estimated for 2026/27. Total
provision over the next 3 years is anticipated to be £56.100 million. The optimistic
scenario assumes pay awards will cost the Council 0.5% less than the envisaged
scenario, whilst the pessimistic scenario assumes a 2.5% increase on the
envisaged assumption, thus providing a range for potential pay award of £17.100
million to £32.000 million in 2026/27 or between £47.300 million and £101.100
million over the next 3 years. Furthermore, as previously advised the plan includes
provision for a permanent reduction in pension contributions as a result of the most
recent triennial revaluation of the Strathclyde Pension Fund. Reflecting the
assumptions on pay award as noted above, a reduction in pension costs of £4.300
million is now anticipated in 2026/27. Pay award assumptions will remain under
review as negotiations continue, and Financial Outlooks will be updated, as
appropriate. 
Non Pay Inflationary Pressures 
2.15 The assumptions from 2026/27 onwards reflect on the OBR's most recent economic
forecast at March 2025 and the latest Bank of England forecast for inflation at February
2025, indicating a downward trajectory towards 2% over the medium term.   
2.16 Historically non-pay inflationary uplifts based on forecast relevant inflationary indices,
have only been provided where deemed material and contractual in nature. This
continues to be the case in this update to the MTFP. As a result, total contract
inflationary pressures of £4.550 million in 2026/27 and £22.590 million over the 5 year
period of the plan, are assumed.   
2.17 Whilst energy costs have increased significantly over recent years there is evidence to
suggest that contract prices negotiated for energy pre-purchased have reduced. There
still remains a great deal of uncertainty however it is deemed reasonable to remove
additional cost pressures for energy provided by the previous version on the plan, on
Page 160 of 174

Page 161

the basis that costs can be managed in the medium term within existing budgets. The
budgetary requirements for future years will be kept under review with an update
provided in future Financial Outlooks or MTFP updates as required.   
Other Cost Pressures  
2.18 Continuing Service Pressures (CSPs) of £2.500 million in 2026/27 has been reflected
which represents the second year of commitment to recognise the increased cost of
ASN activity as a result of emerging and future demand. 
2.19 Other cost pressures totalling £18.883 million over the five years are also provided for.
These predominantly relate to assumed increased costs of Council Tax Reduction
Scheme associated with a Council Tax increase. In addition, provision is made for
increased non-domestic rates costs, and other minor emerging service budget
burdens. 
Other Commitments 
2.20 There is provision for loan debt costs in relation to the Community Investment
Programme, including City Deal, which equates to £6.190 million in year 1 of the plan
and £23.570 million across the planning period. 
2.21 In addition, as advised in the 2025/26 MTFP update, the plan continues to recognise
the updated forecast loan charge costs which have increased due to previously
approved non-recurring loan debt re-profiling savings and increased interest rate costs.
There also remains great uncertainty in forecasting when the budget will be required
due to a number of variables, including the spend profile of the capital programme,
therefore this plan does not change the provisions previously made.   
2.22 The MTFP reported in June 2023 incorporated a saving of £4.500 million for the five
years in respect of the funding for PPP contract obligations. It was recognised that
additional budgetary provision would require to be incorporated into future MTFPs. 
Therefore, year four and five of this plan reflects an additional cost of £1.000 million. 
Further additional financial consequences will be recognised in future Financial
Outlooks or MTFPs. 
Sales, Fees & Charges 
2.23 One of the key principles of the Revenue Budget Strategy, outlined in Appendix 5, is
that maximising income should be considered, with future charging models for services
to be informed by benchmarking and the principles of full cost recovery, where
appropriate. The plan assumes additional income generation for discretionary charges
of £1.000 million in 2026/27, in line with the approved policy to uplifted prices by 5%
each year. The optimistic and pessimistic scenarios assume a slightly adjusted base
for 2026/27 of £1.250million and £0.750 million, respectively. 
Updated Medium Term Financial Forecast 
Approved Savings / Advance Action 
2.24 This plan recognises previously approved savings and base budget adjustments,
currently totalling £2.030 million across the term of the plan. However, the plan also
recognises the impact of prior year decisions to use one of resources to assist with the
implementation of savings which result in a cost pressure of £2.948 million in 2026/27.   
Page 161 of 174

Page 162

2.25 This plan assumes all other previously approved savings will be fully achieved. 
Committee should note that updates in this regard will be provided to future meetings
and amendments to the Financial Plan will be made accordingly. 
Strategic Use of Balances 
2.26 The Council’s unallocated balances continue to be closely monitored. A key principle
of the Revenue Budget Strategy and the Revenue Budget Framework is that planned
and sustainable use of available balances will be considered, in line with policy, and in
accordance with a budget strategy recommended by the S95 Officer.   
Summary – Medium Term Financial Forecasts 
2.27 In summary, the envisaged scenario indicates a budget gap of £136.927 million over
the five-year planning period and £85.949 million for the three-year budget period
2026/27 to 2028/29. Further details are contained within Appendix 1. Appendices 2 and
3, summarise the forecast pessimistic and optimistic scenarios indicating the gap could
range between £64.852 million and £263.691 million, over the five years. 
2.28 Appendix 4 provides a high-level summary of the movements between this plan and
the previous plan reported to Committee in June 2024. 
Council Tax Strategy 
2.29 In line with the Revenue Budget Framework outlined below, Council officers will work
with Elected Members to ensure options for potential solutions are presented to enable
the Council to address the budget gap in each financial year and to meet its legal
obligation to set a balanced budget.   
2.30 Members will recall the budget strategy proposed by the S95 Officer in setting the
2024/25 budget made an assumption around Council Tax increases over the three year
period, with the potential to materially reduce the forecast budget gaps and therefore
ultimately the savings requirement.  It is intended that the S95 Officer will present an
update to the Council Tax Strategy to Policy and Strategy Committee in December
2025. However, should a similar approach be recommended for the 2026/27 to 2028/29
three year budget, members are reminded that an annual Council Tax increase
between 5% and 10% is estimated to generate additional income between £12.600
million £22.100 million. The equivalent of £37.800 million and £66.300 million over a
three year planning period.    
Risks and Uncertainties 
2.31 Whilst the assumptions applied to income and expenditure projections in this financial
plan are based on the best information available at the time of writing, they are
inherently uncertain. The key factors which are likely to impact upon the Council’s
assumptions and future financial plans have been discussed throughout the report,
including the significant uncertainty in relation to the Council’s funding settlement and
uncertainty in assumed cost of pay awards. There are also a number of political factors
which may impact on planning assumptions, including potential changes at UK and
Scottish Government levels as a result of elections, and the financial consequences of
this on Local Government, along with climate change commitments. 
2.32 Other current notable risks previously reported include; 
Page 162 of 174

Page 163

2.32.1 Ash tree dieback linked to a disease which could cause significant damage to the UK’s
ash population. As has been previously recently reported to Committee, there has been
some capital funding allocated to support the cost in managing the diseased species.
However, there is a still a risk that revenue resources are required in respect of this
issue.   
2.32.2 Committee are also reminded of Scottish Government’s plans to review the Capital
Accounting arrangements and statutory mitigations in respect of such, to ensure they
remain fit for purpose. Since the revised circular issued in 2024, there has been no
further movement. It is still understood that the plan is to comprehensively review
existing statutory arrangements, with a view to reducing reliance on statutory
mitigations and offer greater alignment with international accounting standards. This
continues to cause real concerns and Local Authority Directors of Finance and COSLA
continue to seek engagement on such plans. Removing existing statutory mitigations
will have material financial consequences on revenue budgets and ultimately potentially
impacting on capital investment programmes. 
2.32.3 The Scottish Government launched a consultation in January 2025 seeking views on
Local Authority General Power of Competence. This would give local authorities
statutory power to act as an individual generally would, expanding the scope of
activities that a council might undertake.  The consultation closed on 31 March 2025,
and an analysis report of the findings is expected to be made available in due course. 
There is no immediate impact to the Council from this. If the powers were to be enacted
in Scotland, any decision to use those powers would be subject to normal decision-
making processes where any financial impact would be taken into account. 
Revenue Budget Strategy Update 
2.33 The MTFP presented to committee in June 2024 provided an update on the Revenue
Resources Budget Strategy that was approved in June 2019, providing a revision of
the principles that underpin our financial plans to ensure robust and financially
sustainable decisions have been taken in setting the revenue budget. Seven revised
principles were recommended and set out at that time. The Section 95 Officer has
carried out a further high level review this year to ensure these remain relevant and
has concluded that no further update is required. Appendix 5 however provides
members with a summary of the principles as a reminder.   
Revenue Budget Framework 
2.34 Aligned to the MTFP and Revenue Budget Strategy principles, Table 2 below provides
an outline framework to govern the 2026/27 budget process and to ensure that the
Council manages the rolling three year budget forecast position as reported in the
annual MTFP, in a robust and timely manner. This framework will be reviewed annually. 
Table 2
Action Detail Responsibility Timeline
Annual update of
MTFP to P&S
Committee 
Review and update the assumptions of the
MTFP to ensure the Council has a robust an
up to date forecast financial plan.
S95 Officer Committee
Cycle 2 
Update & Report
Financial
Outlooks
Ongoing review of financial plan
assumptions and provision of updated
Financial Outlooks for material changes. 
These will be reported as part of the budget
engagement and / or an update provided to
Committee, as deemed appropriate.
S95 Officer Ongoing
between
June 2025
and  January
2026
Page 163 of 174

Page 164

Report on
Delivery of
Approved Savings
Updates reported to Finance & Resources
Committee to approved savings are on
target to deliver approved financial savings.
Chief Officers/
S95 Officer
Committee
Cycle 3 2025
& Cycle 1
2026
Budget Strategy
to Manage the 3
Year Position (e.g.
smoothing)
The S95 Officer will consider the updated
three gap and recommend a strategy to
manage the position. This strategy will give
due consideration to the scale of the
challenge and the overall level of reserves
available to support the position, and in line
with the Reserves Policy. 
S95 Officer September
2025
All Member &
Trade Union
Engagement
Ongoing engagement to keep key
stakeholders informed of the financial
position and to support with decision making
to set a balanced budget.
Chief
Executive &
S95 Officer
MTFP
briefing in
June 2025.
Further
briefings to
be advised
with revised
Financial
Outlooks 
Review other
Councils’
approaches to
identification of
savings
Aligned with Principle 2 & 3 above and
informed by benchmarking; research other
LAs approach to savings to ensure NLC
maximises all opportunities for efficiencies,
savings, or income generation.
CMT October
2025
Refresh of
existing in-scope
budget savings
options
Officers will ensure there is a current list of
options to support members decision
making in closing future budget gaps, as
required. 
Chief Officers/
Finance
Teams
Ongoing
Budget Report to
Council
An update on the three-year financial
forecast will be reported to Council which will
incorporate the Council’s grant settlement as
indicated by Scottish Government.  
S95/ Political
Groups 
2.42 Continuing with the approach taken in relation to the 2025/26 budget setting, members
will be invited to a briefing session about the MTFP. This is anticipated to take place in
June and will allow members the opportunity to raise any questions or queries.   
Integration Joint Board Medium Term Financial Plan 
2.43 Table 3 below details the budget gap highlighted within the IJB MTFP approved in
March 2025, alongside the anticipated budget gap for the Council. As the IJB sets out
its MTFP and 3 year budget gap in March each year including the immediate financial
year, the planning period covered therefore differs from the Council’s planning period. 
Table 3
IJB
Envisaged
Budget
Gap
£000
NLC
Envisaged
Budget
Gap
£000
2025/26 14,729    
2026/27 18,322     34,638    
2027/28 18,804     25,956    
2028/29 25,355    
3 Yeah Gap 51,855     85,949
Page 164 of 174

Page 165

2.44 The Council continue to pass on funding received from Scottish Government in respect
of Adult Social Care activity including support for the changes to the Scottish living
wage, uprating of free person care and its share of funding linked to pay awards. Whilst
the IJB present their budget gap and recommended options for service redesign and
transformation in order to close their gap on an annual basis, elected members should
continue to be mindful of the Council’s contribution to the IJB in support of its cost and
demand pressures when settling its budget for 26/27 and beyond. 
3. Measures of success  
3.1 Development of solutions aligned to the Council’s strategic objectives outlined in  the
Plan for North Lanarkshire.
3.2 Setting of a balanced budget for 2026/27 and subsequent years.
3.3 Successful and timeous implementation of approved solutions. 
4. Supporting documents 
Appendix 1 Envisaged Scenario
Appendix 2 Pessimistic Scenario
Appendix 3 Optimistic Scenario
Appendix 4 Summary of Movements
Appendix 5 Revenue Resources Budget Strategy – Key Principles 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 165 of 174

Page 166

5. Impacts
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 166 of 174

Page 167

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 167 of 174

Page 168

Envisaged Scenario Appendix 1
2026/27 2027/28 2028/29 2029/30 2030/31
£000s £000s £000s £000s £000s
Anticipated Cost Pressures 26,330 26,701 25,125 26,033 26,395
Pay Award 19,600 18,000 18,500 19,100 19,600
Pension Costs (4,300) 0 0 0 0
Other Employee Costs; first stage review of pay and grading mode 0 0 0 0 0
Contract Inflation 4,550 4,530 4,380 4,500 4,630
Energy Costs 0 261 266 292 292
CSPs 2,500 0 0 0 0
Other Cost Pressures 4,980 4,910 2,979 3,141 2,873
Income Generation-Discretionary Fees & Charges (1,000) (1,000) (1,000) (1,000) (1,000)
Other Commitments 9,490 8,790 6,490 4,800 5,800
City Deal Commitments 290 290 290 0 0
Community Investment Fund 5,900 5,900 3,500 3,200 4,200
Loan Charges Obligations 2,400 2,600 2,700 600 600
PPP Contract Obligations 0 0 0 1,000 1,000
SPF cost reduction 28,300 0 0 0 0
New Investment; Community Hubs CFCR (23,416) 0 0 0 0
Use of one off to smooth budget (3,984) 0 0 0 0
Total Cost Pressures 35,820 35,491 31,615 30,833 32,195
Less:
Resource Forecasts 8,730 9,230 6,260 4,770 7,280
AEF adjustments - Core 1,830 2,330 1,760 570 2,080
1% Council Tax Increase; CIF 3,828 3,912 2,083 2,130 2,201
Net Council Tax Growth inc. rebaselining adj in year 1 3,072 2,988 2,417 2,070 2,999
Budget Gap before carry fwd of unresolved gap & advanced
action 27,090 26,261 25,355 26,063 24,915
Unresolved Recurring Budget Gap B/fwd 3,984 0 0 0 0
Revised Budget Gap before advanced action 31,074 26,261 25,355 26,063 24,915
Approved Advance Action 3,564 (305) 0 0 0
Approved Base Budget Adjustments (507) (305) 0 0 0
2024/25 Approved Savings now applied (1,218) 0 0 0 0
Reversal of previous years use of reserves for delayed saving 1,218 0 0 0 0
Use of Reserves for CTR impact of CTAX 1,730 0 0 0 0
Use of Reserves for eNIC shortfall 2,341 0 0 0 0
Budget Gap after approved advanced action 34,638 25,956 25,355 26,063 24,915
3 year total (26/27 to 28/29) 85,949
Page 168 of 174

Page 169

Pessimistic Scenario Appendix 2
2026/27 2027/28 2028/29 2029/30 2030/31
£000s £000s £000s £000s £000s
Anticipated Cost Pressures 38,850 42,982 42,754 44,902 46,632
Pay Award 32,000 33,600 35,500 37,400 39,500
Pension Costs (4,400) 0 0 0 0
Other Employee Costs; first stage review of pay and grading mode 0 0 0 0 0
Contract Inflation 5,350 5,400 5,300 5,470 5,650
Energy Costs 255 523 536 552 552
CSPs 2,500 0 0 0 0
Other Cost Pressures 3,895 4,210 2,168 2,230 1,680
Income Generation-Discretionary Fees & Charges (750) (750) (750) (750) (750)
Other Commitments 10,880 9,080 6,780 4,800 4,200
City Deal Commitments 580 580 580 0 0
Community Investment Fund 5,900 5,900 3,500 3,200 4,200
Loan Charges Obligations 2,400 2,600 2,700 600 0
PPP Contract Obligations 0 0 0 1,000 0
SPF cost reduction 29,400 0 0 0 0
New Investment; Community Hubs CFCR (23,416) 0 0 0 0
Use of one off to smooth budget (3,984) 0 0 0 0
Total Cost Pressures 49,730 52,062 49,534 49,702 50,832
Less:
Resource Forecasts (380) 190 (2,710) (4,130) (1,540)
AEF adjustments - Core (7,280) (6,710) (7,210) (8,330) (6,740)
1% Council Tax Increase; CIF 3,828 3,912 2,083 2,130 2,201
Net Council Tax Growth inc. rebaselining adj in year 1 3,072 2,988 2,417 2,070 2,999
Budget Gap before carry fwd of unresolved gap & advanced
action 50,110 51,872 52,244 53,832 52,372
Unresolved Recurring Budget Gap B/fwd 3,984 0 0 0 0
Revised Budget Gap before advanced action 54,094 51,872 52,244 53,832 52,372
Approved Advance Action 3,564 (305) 0 0 0
Approved Base Budget Adjustments (507) (305) 0 0 0
2024/25 Approved Savings now applied (1,218) 0 0 0 0
Reversal of previous years use of reserves for delayed saving 1,218 0 0 0 0
Use of Reserves for CTR impact of CTAX 1,730 0 0 0 0
Use of Reserves for eNIC shortfall 2,341 0 0 0 0
Budget Gap after approved advanced action 53,674 51,567 52,244 53,832 52,372
3 year total (26/27 to 28/29) 157,485
Page 169 of 174

Page 170

Optimistic Scenario Appendix 3
2026/27 2027/28 2028/29 2029/30 2030/31
£000s £000s £000s £000s £000s
Anticipated Cost Pressures 22,177 22,706 21,183 22,002 22,847
Pay Award 17,100 14,900 15,300 15,700 16,100
Pension Costs (4,300) 0 0 0 0
Other Employee Costs; first stage review of pay and grading mode 0 0 0 0 0
Contract Inflation 3,720 3,660 3,470 3,550 3,630
Energy Costs (256) 4 7 9 9
CSPs 2,500 0 0 0 0
Other Cost Pressures 4,663 5,391 3,656 3,994 4,358
Income Generation-Discretionary Fees & Charges (1,250) (1,250) (1,250) (1,250) (1,250)
Other Commitments 9,290 8,790 6,490 4,800 4,200
City Deal Commitments 290 290 290 0 0
Community Investment Fund 5,900 5,900 3,500 3,200 4,200
Loan Charges Obligations 2,400 2,600 2,700 600 0
PPP Contract Obligations 0 0 0 1,000 0
SPF cost reduction 28,100 0 0 0 0
New Investment; Community Hubs CFCR (23,416) 0 0 0 0
Use of one off to smooth budget (3,984) 0 0 0 0
Total Cost Pressures 31,467 31,496 27,673 26,802 27,047
Less:
Resource Forecasts 17,830 18,440 15,590 14,210 16,820
AEF adjustments - Core 10,930 11,540 11,090 10,010 11,620
1% Council Tax Increase; CIF 3,828 3,912 2,083 2,130 2,201
Net Council Tax Growth inc. rebaselining adj in year 1 3,072 2,988 2,417 2,070 2,999
Budget Gap before carry fwd of unresolved gap & advanced
action 13,637 13,056 12,083 12,592 10,227
Unresolved Recurring Budget Gap B/fwd 3,984 0 0 0 0
Revised Budget Gap before advanced action 17,621 13,056 12,083 12,592 10,227
Approved Advance Action 3,564 (305) 0 0 0
Approved Base Budget Adjustments (507) (305) 0 0 0
2024/25 Approved Savings now applied (1,218) 0 0 0 0
Reversal of previous years use of reserves for delayed saving 1,218 0 0 0 0
Use of Reserves for CTR impact of CTAX 1,730 0 0 0 0
Use of Reserves for eNIC shortfall 2,341 0 0 0 0
Budget Gap after approved advanced action 17,201 12,751 12,083 12,592 10,227
3 year total (26/27 to 28/29) 42,035
Page 170 of 174

Page 171

Appendix 4
2026/27 2027/28 2028/29 2029/30 Total
£000s £000s £000s £000s £000s
MTFP Gap June 2024 21,320 19,095 19,433 18,675 78,523
Action Approved
2024/25 Pay Award 100 200 200 100 600
Adjustment to future year pay assumptions 6,000 6,200 12,200
Non Pay inflation assumptions 680 140 30 (170) 680
Committee/Council Decisions (174) (305) (479)
One off use of balances 4,400 4,400
Total Changes 11,006 6,235 230 (70) 17,401
Revised Gap per February 2025 32,326 25,330 19,663 18,605 95,924
Updated Assumptions April 2025
Cost Pressures
Pay Award 1,900 (100) 6,400 6,800 15,000
Pension Costs (100) (100)
Contract Inflation 630 630 580 720 2,560
Energy Costs (416) (163) (167) (183) (929)
Other Cost Pressures 2,720 2,510 449 471 6,150
Sales Fees & Charges 50 110 160 220 539
Community Investment Fund 3,200 2,900 500 (200) 6,400
Funding
AEF adjustments - Core (1,830) (2,330) (1,760) (570) (6,490)
2%/1% Council Tax Increase; CIF (2,008) (2,042) (153) (240) (4,443)
Net Council Tax Growth inc. rebaselining adj in year  (1,172) (888) (317) 440 (1,937)
Impact of Approved Actions 0
Approved Base Budget Adjustments (333) (333)
Reversal of use of Reserves for CTR impact of CTAX 1,730 1,730
Reversal of use of Reserves for eNIC shortfall (2,059) (2,059)
Movement 2,312 626 5,692 7,458 16,088
Revised MTFP Gap 34,638 25,956 25,355 26,063 112,012
3 Year Budget Gap 85,949
Page 171 of 174

Page 172

Appendix 5
Revenue Resources Budget Strategy
Key Principles 
1) Revenue funding will be directed to the Council’s key priorities 
Integration of the Plan for North Lanarkshire and the Financial Plan will ensure that
resources are directed towards the key priorities and that current service delivery is
prudent, affordable and sustainable.  Services should manage allocated revenue
resources effectively and ensure delivery of previously approved savings, whilst
managing unmet budget burdens, thus enabling net allocated revenue resources to be
directed to delivery of current service provision. The Programme of Work is critical to
delivery of the financial strategy, driving change and future financial efficiencies and
savings. Any requirement for new or enhanced services should be reported either
through appropriate committees or part of the budget process, to ensure there is a
coherent decision-making strategy and prioritisation of resources, particularly given the
ongoing future financial challenges the Council faces. 
2) Three year rolling budgets will be developed 
A strategy to manage the position in line with the Revenue Budget Framework will be
recommended by the S95 Officer. It is recognised the strategy will require a combination
of solutions and initiatives to close future budget gaps, and that mixture of shorter and
longer term initiatives may be required, some of which will not deliver early financial
benefits due to longer lead times.  This will include the continued need for all Services to
identify and deliver savings. 
3) Service delivery should remain under continuous review to ensure the Council
delivers best value and efficient services 
Service design and delivery reviews should be informed by benchmarking and where
appropriate reported for approval through a relevant Committee, in accordance with the
Scheme of Administration. This will support the Council in its statutory duty to provide
best value, inform decision making and allow the financial implications to be incorporated
timeously into the MTFP or Financial Outlooks.  Such reviews should enable service
performance to be compared with other peer Local Authorities, aiming to minimise cost,
maximising income generation and potentially generating financial savings . 
These reviews may mean re-prioritisation or a change in service performance, to enable
the Council to deliver more of the existing services, for longer.   
The Revenue Budget Framework aims to ensure there is a cohesive and joined up
approach to consideration of savings, particularly where these are crosscutting.  Such
an approach to decision making will require strong and effective leadership, to ensure
the Council remains financially sustainable. 
4) Maximising income generation should be considered   
The opportunities to maximise income generation should be informed by benchmarking,
where appropriate, and should include implementing a Council Tax Strategy to maximise
revenue resources available for service priorities.  All future charging models should be
informed by the principle of full cost recovery. Once charges are established on this
basis, future increases will be index-linked in line with approved policies. 
Page 172 of 174

Page 173

5) Planned and sustainable use of available balances will be considered in line with
policy 
Sustainable use of balances will be considered where it is prudent and affordable and in
line with the Reserves Policy and the provisions contained in the Revenue Budget
Framework outlined below.  This may include managing the financial impact of a budget
strategy, as recommended by the S95 Officer, with the aim to close future budget gaps
and to support the timing of delivering approved savings. 
6) Members and other key stakeholders will be actively involved in the budget
process 
The financial pressures facing the Council means Councillors need to make difficult
decisions. To manage these challenges requires effective political leadership and
communications. It is essential that all Councillors, and other key stakeholders as
deemed appropriate, work effectively with officers to identify and deliver necessary
savings or alternative solutions, to and meet the statutory requirement to set a balanced
budget.   
7) Consideration will be given to proposals to fully implement the use of participatory
budgeting and opportunities to meet statutory requirements under the Community
Empowerment (Scotland) Act 2015 
The outcome of such considerations will inform members’ decisions around the solutions
to ensure the Council continues to manage the budget challenges it faces. 
Page 173 of 174

Page 174

Page 174 of 174