Agenda Document Pack - Policy and Strategy Committee - 13/03/2025

North Lanarkshire Council · 13 March 2025
Back to Policy and Strategy Committee — 13 March 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

4 March 2025 
Members of the 
Policy and Strategy Committee
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Policy and Strategy Committee is to be held in the
Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Thursday, 13
March 2025 at 14:00 PM which you are requested to attend. 
The agenda of business is attached. 
Archie Aitken
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Mark Hamill
Clerk Telephone: 07811294702
Clerk Email: committee@northlan.gov.ukk 
J Logue, T Fisher, L Roarty, C Barclay, A Beveridge, H Brannan-McVey, A Bustard, T
Carragher, C Costello, P Di Mascio, K Duffy, W Goldie, D Johnston, J Leckie, G Lennon, H
Loughran, M McBride, M McPake, L Nolan, G Robinson, A Smith, A Stubbs, R Sullivan, S
Watson, G Woods.  
Page 1 of 290

Page 2

Page 2 of 290

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000   
2 Minute of Audit and Scrutiny Panel of 24 February
2025
Submit Minute of Audit and Scrutiny Panel of 24
February 2025 
7 - 12  
Operational   
3 Delivering the Programme of Work to 2028 - Key
Achievements
Submit report by Chief Executive (1) providing an
update on the progress made on delivering the
Programme of Work to 2028  and (2) seeking
endorsement of the key role that the Committee has in
respect of delivering The Plan for North Lanarkshire
through the Programme of Work and ensuring strategic
oversight in terms of its ongoing development, co-
ordination, and monitoring. 
13 - 66 
4 The latest North Lanarkshire context, challenges
and next steps
Submit report by the Chief Executive demonstrating the
change in performance from the baseline set at the
time when The Plan for North Lanarkshire was
established, and taking  a deeper dive into the data
and trends that sit underneath the 28 Health Check
Indicators in order to ascertain the underlying factors
key to informing delivery of the Programme of Work to
2028 and its priorities. 
67 - 104 
5 Digital and IT Strategy 2024-27 update as at March
2025
Submit report by Chief Officer (Business and Digital)
providing the six-monthly update on the Digital and IT
Strategy for 2024 to 2027. 
105 - 126
Page 3 of 290

Page 4

6  Arms-Length External Organisations (ALEO) 2024
Review
Submit report by Chief Officer (Business and Digital)
seeking consideration of the findings of the ALEO
Review Board. 
127 - 160 
7 First Stop Shop Service Re-design Consultation
and Proposals
Submit report by Chief Officer (Housing) summarising
the responses received from the consultation in relation
to the re-design of the First Stop Shop operating model
and seeking approval for revised proposals to provide
a more sustainable future delivery model. 
161 - 190 
8 Digital Connectivity Masterplan for Council
Housing Tenants
Submit report by Chief Officer (Housing) setting out the
proposals for a long-term integrated plan to provide
digital connectivity for council housing tenants. 
191 - 202 
9 Strategic Capital Investment Programme 2024-25 to
2028-29
Submit report by the Depute Chief Executive providing
an annual update on the Council’s Strategic Capital
Investment Programme including an update on
available resources and expected profile of expenditure
of the remainder of the current five year capital
planning period from 2024/25 to 2028/29. 
203 - 230 
10  Revised North Lanarkshire Integration Scheme
2024-2029
Submit report by Chief Officer (Health and Social Care
Partnership) acknowledging the Cabinet Secretary's
approval of the North Lanarkshire Integration Scheme
2024-2029. 
231 - 290  
EXCLUSION OF PUBLIC
The Sub-Committee is asked to consider passing the
following resolution: "That under Section 50A(4) of the
Local Government (Scotland) Act 1973, the public be
excluded from the meeting for the following item of
business on the grounds that it involves the likely
disclosure of exempt information as defined in
paragraph 11 of Part 1 of Schedule 7A of the Act". 
Page 4 of 290

Page 5

11  Review of Pay and Grading Model
Submit report by Chief Officer (People Resources)
setting out the proposed approach for the Council’s pay
and grading model. 
Page 5 of 290

Page 6

Page 6 of 290

Page 7

AUDIT  AND  SCRUTINY  PANEL  -  24 FEBRUARY 2025 
1
24 February 2025 at 2 pm. 
A Meeting of the AUDIT  AND  SCRUTINY  PANEL 
PRESENT 
Councillor Watson, Convener; Councillor B. McCulloch, Vice-Convener; Councillors Costello, Hughes, Hume,
Leckie, M. McCulloch, McLaren and Robinson. 
CHAIR 
Councillor Watson (Convener) presided. 
IN  ATTENDANCE 
Chief Officer (Audit and Risk); Chief Officer (Asset and Procurement); Chief Officer (Business & Digital); Chief
Officer (Education – South); Chief Officer (Finance); Chief Officer (People & Organisational Development); Audit
Manager; Corporate Risk Manager; Business Strategy Manager; Technology Strategy Manager; Strategy and
Performance Manager; Business Finance Manager (Resources), and Democratic Co-Ordinator. 
ALSO IN ATTENDANCE 
John Boyd and Rachel Brough, Audit Scotland 
APOLOGIES 
Councillors Duffy-Lawson and D Johnston. 
DECLARATIONS  OF  INTEREST  IN  TERMS  OF  THE  ETHICAL  STANDARDS  IN  PUBLIC  LIFE  ETC. 
(SCOTLAND)  ACT  2000 
1. There were no declarations of interest. 
The Chair exercised his discretion to vary the order of business, as hereinafter minuted. 
SCHOOL IT ASSETS – AGE AND MAINTENANCE 
2. With reference to paragraph 3 of the minute of the meeting of this Committee held on 9 May 2024,
there was submitted a report by the Chief Officer (Business & Digital) (1) providing details of the
volume, and age profile of the IT Assets used in schools; (2) advising that any Windows PC 6 years
or older would not be supported by the latest version of Microsoft Windows (11) operating system and
would not be viable after October 2025; (3) informing that the Service were exploring scope to establish
a cross service working group to (a) investigate the appropriate levels of IT assets required for learning
and teaching across all education sectors; (b) identify the product types that would support a modern
and effective pedagogy in use of technology; (c) develop a strategic approach regarding IT asset
distribution and refresh; (d) establish clear guidelines for the on-going support of educational IT assets,
while considering the development of support towards Town and Community Hubs and future
operating model aligned to the Programme of Work and (e) examine on-going reporting facilities to
identify support requirements against estate demographics. 
Decided: that a cross service working group be established to (a) investigate the appropriate
levels of IT asset required for learning and teaching across all education sectors; (b)
to identify the product types that would support a modern and effective pedagogy in
use of technology; (c) to develop a strategic approach regarding IT asset distribution
Item 2
Page 7 of 290

Page 8

AUDIT  AND  SCRUTINY  PANEL  -  24 FEBRUARY 2025 
2
and refresh; (d) to establish clear guidelines for the on-going support of educational
IT assets, while considering the development of support towards Town and
Community Hubs and future operating model aligned to the Programme of Work and
(e) to examine on-going reporting facilities to identify support requirements against
estate demographics. 
AUDIT AND RISK RELATED ITEMS: ACTION LOG 
3. There was submitted a report by the Chief Officer (Audit and Risk) (1) enabling the panel to track
implementation of requests and recommendations made by it in respect of Audit and Risk related
items within the action log and (2) attaching, as an appendix to the report, the action log, recording the
requests and recommendations by the Panel, and when these had been addressed and/or were
expected to be addressed. 
Decided: that the contents of the report be acknowledged. 
INTERNAL AUDIT FOLLOW-UP OF ACTIONS PREVIOUSLY AGREED BY MANAGEMENT IN RESPONSE
TO AUDIT RECOMMENDATIONS 
4. There was submitted a report by the Chief Officer (Audit and Risk) (1) detailing the extent to which
management had implemented actions previously committed to in response to recommendations
contained within Internal Audit reports, where those actions were due to be completed in the period
October to December 2024; (2) advising that Internal Audit had concluded that of the 25 high and
medium priority recommendations that were due, 13 had been fully completed, 11 had been assessed
as partially implemented and one was no longer relevant; (3) intimating that 7 recommendations had
been identified as having an implementation date more than 12 months overdue; (4) explaining that 4
of the 14 agreed actions from the External Audit report had been completed, 2 had been partially
implemented and 8 were not yet due and (5) attaching, as appendices to the report (a) commentary
from the management detailing proposed management actions, revised target dates for completion of
outstanding recommendations; (b) Internal Audit recommendations previously reported as
outstanding, now complete; (c) Internal Audit recommendations of actions due, not complete; (d)
Residual Risk Rating Definition and (e) Internal Audit recommendations where the original
implementation date was more than 12 months overdue. 
Decided: (1) that the contents of the report be noted and 
(2) that the recommendations made by Internal Audit in Appendix 2 be noted. 
INTERNAL AUDIT PROGRESS REPORT 
5. There was submitted a report by the Chief Officer (Audit and Risk) (1) providing an overview of Internal
Audit activity; (2) reporting the results of the Internal Audit outputs finalised since the last update to
the Panel in October 2024; (3) highlighting the most significant issues arising from the completed audit
work; (4) setting out details of the recent unplanned review of a school fund, together with a summary
of an audit investigations concluded within the period; (5) updating the Panel on other aspects of the
work undertaken by Internal Audit and (6) attaching, as appendices to the report, (a) Audit Grading
Definitions; (b) Changes to Audit Plan 2024-25 and (c) Internal Audit Client Feedback Results. 
Decided: (1) that the findings, conclusions and recommendations of completed Internal Audit
reports, together with associated management responses, be noted; 
(2) that the Chief Officer (Audit and Risk) submit reports to future meetings of the
Panel on progress being made in implementing agreed management actions in
relation to all Audit recommendations categorised as high or medium, and 
(3) that the report be otherwise noted.
Page 8 of 290

Page 9

AUDIT  AND  SCRUTINY  PANEL  -  24 FEBRUARY 2025 
3
RISK MANAGEMENT UPDATE 
6. There was submitted a report by the Chief Officer (Audit and Risk) (1) providing an update on
developments and changes in relation to the corporate risk register and other key risk management
developments since the last update to the Panel in October 2024 with a particular focus on changes
to corporate risk scores, new or emerging risk issues; (2) providing a snapshot of the highest current
residual risks within Service risk registers together with a summary of the key considerations of the
Risk Management Corporate Working Group within the reporting period, and (3) attaching as
appendices to the report (a) the Corporate Risk Register 2024/25 and (b) the Highest Scoring Service
Risk Register Entries. 
During discussion on this matter, questions were asked to which Officers committed to respond outwith
the meeting as undernoted:- 
Do the figures on RAAC include properties owned by ALEO’s of the Council? (Councillor Robinson) 
Can Members be provided with a copy of the RAAC risk assessment and any plans in place to deal
with the risks? (Councillor Hume) 
Decided: (1) that the information provided on developments on the Corporate Risk Register for
2024/25, as attached in appendix 1 to the report be acknowledged; 
(2) that the residual risk profile across Service Risk Registers, as attached in appendix
2 be noted, and 
(3) that the summary of key discussion points of the Risk Management Corporate
Working Group be noted. 
SERVICE UPDATE – SCHOOL FUND COMPLIANCE ARRANGEMENTS 
7. With reference to the paragraph 9 of the minute of the meeting of this Committee held on 31 October
2024, there was submitted a report by the Chief Officer (Education – South) (1) providing an update
on compliance with Establishment Fund arrangements; (2) highlighting the key findings from the audit
report, (3) outlining steps taken by the Service to date and future planned actions designed to improve
the effectiveness of the relevant management arrangements, and (4) attaching as an appendix to the
report, a summary of the most recent Internal Audit assignment. 
Decided: that the actions taken to date, and further planned actions in response to previous   
Establishment Fund audits be noted. 
STRATEGIC PERFORMANCE FRAMEWORK – PERFORMANCE REPORTING SCHEDULE QUARTERLY
PERFORMANCE ASSURANCE REVIEW 
8. There was submitted a report by the Chief Officer (Business and Digital) (1) setting out a summary of
the Council’s performance reports in one composite assurance overview to support the Audit and
Scrutiny Panel in maintaining strategic oversight and awareness of the Council’s performance
reporting arrangements in line with the Panel’s remit to provide “independent review of the Council’s
governance, risk management, performance, and control frameworks”; (2) advising that the framework
supports the Audit and Scrutiny Panel’s governance and accountability role in terms of ensuring the
Council can demonstrate Best Value through the existence of robust arrangements for performance
reporting and scrutiny, and (3) providing details of the outcome from the latest quarterly performance
assurance review which was undertaken based on performance reports submitted to Council
committees during cycle 4 of 2024. 
Page 9 of 290

Page 10

AUDIT  AND  SCRUTINY  PANEL  -  24 FEBRUARY 2025 
4
Decided: that the composite overview of performance reporting period set out in Appendices 1
and 2 of the report, to maintain an awareness of each report within the Performance
Reporting Schedule for 2024 to 2025, be acknoweldged. 
SCRUTINY WORK PROGRAMME – UPDATE 
9. There was submitted a report by the Chief Officer (Audit and Risk) (1) providing an update on the
composite Scrutiny Work Programme and reporting timetable for the scrutiny function of the Audit and
Scrutiny Panel, as set out in Appendix 3 to the report, and (2) seeking endorsement to continue the
role of Audit and Scrutiny Panel  Members in identifying potential issues for inclusion in the Scrutiny
Work Programme in line with the Assessment and Prioritisation Process, set out in Appendix 2 to
report and the overall approach as set out in Appendix 1 to the report. 
Decided: (1) that the update to the composite Scrutiny Work Programme and reporting timetable
for the scrutiny function of the Audit and Scrutiny Panel, as set out in Appendix 3, be
acknowledged;   
(2) that the role of Panel Members in identifying potential issues for inclusion in the
Scrutiny Work Programme in line with the Assessment and Prioritisation Process, as
set out in Appendix 2, and the overall approach, as set out in Appendix 1 be
acknowledged; 
(3) that Panel Members continue to undertake their scrutiny role in reviewing and
challenging performance to ensure the Council fulfils its statutory Best Value duty, and 
(4) that the approach and next steps, as set out in the report, in relation to the follow
up self-evaluation of the Audit and Scrutiny Panel be endorsed. 
QUALITY ASSURANCE FOR THE PROJECT MANAGEMENT FRAMEWORK AND PROGRAMME OF
WORK – ANNUAL AUDIT AND SCRUTINY PANEL REVIEW 
10. There was submitted a report by the Chief Officer (Audit and Risk) (1) providing an update on the
implementation of the Quality Assurance arrangements which have resulted in the information set out
in the report for Elected Member oversight in terms of the quality assurance process and the review
programme, and (2) setting out the next steps, in paragraphs 2.11 and 2.12 of the report, which will
ensure ongoing oversight and quality assurance in terms of demonstrating progress in delivering the
Programme of Work and achieving the vision set out in The Plan for North Lanarkshire. 
Decided: (1) that the implementation of Quality Assurance arrangements which have resulted
in the information, as set out in the report for Elected Member oversight, in terms of
the quality assurance process and review programme be acknowledged, and 
(2) that the role of the Panel, as set out in the next steps in paragraphs 2.11 and
2.12 of the report, to ensure ongoing  oversight and quality assurance in terms of
demonstrating progress in delivering the Programme of Work and achieving the
vision set out in The Plan for North Lanarkshire be acknowledged. 
AUDITING BEST VALUE IN LOCAL GOVERNMENT – UPDATE 
11. There was submitted a report by the Chief Officer (Business & Digital) (1) reminding the Panel of the
Best Value duty, which requires the Council to ensure arrangements are in place to secure continuous
improvement in performance for all the functions and activities in delivering services and improving
outcomes; (2) providing an update on the national approach to auditing Best Value which will be
implemented during 2025/26 and which came into effect as part of the external auditor five year
Page 10 of 290

Page 11

AUDIT  AND  SCRUTINY  PANEL  -  24 FEBRUARY 2025 
5
appointments from 2022/23, and (3) summarising the Members’ key role to ensuring the Council
continues to demonstrate Best Value in practice. 
Decided: (1) that the update to the national approach to auditing Best Value, the priority for
the year three thematic Best Value audit work, and the implications for the Council
be acknowledged, and 
(2) that the Panel’s role, in terms of ensuring the Council continues to secure Best
Value in practice, in line with the statutory duty, be endorsed. 
The Convener being of the view that the following item of business was relevant, competent and
urgent, authorised its consideration to enable the Council to progress the matter timeously. 
NORTH LANARKSHIRE COUNCIL – ANNUAL AUDIT PLAN 2024/25 
12. There was submitted a report by the Chief Officer (Audit and Risk) (1) providing the Panel witha copy
of the Annual Audit Plan 2024/25, which had been received from Audit Scotland, the Council’s
appointed external auditors; (2) advising that the Plan provides an overview of key issues arising from
the audit planning process including (a) a summary of the proposed audit approach; (b) the scope for
undertaking audit work, and (c) the timetable for key audit outputs, and (3) noting that good
professional practice requires the external auditor to communicate and discuss planned external audit
activity with the senior management and those Elected Members charged with Governance matters. 
Thereon, J Boyd, Audit Scotland, spoke to the Audit Scotland Annual Audit Plan and responded to a
number of questions from Members of the Panel. 
Decided: that the Annual Audit Plan 2024/25, by Audit Scotland, together with the oral
presentation provided by Audit Scotland, regarding its planned audit approach to the
2024/25 Audit of the Council, be acknowledged. 
Page 11 of 290

Page 12

Page 12 of 290

Page 13

North Lanarkshire Council
Report 
Does this report require to be approved? ☐ Yes ☒ No
Ref DM/SL Date 13/03/25 
From Des Murray, Chief Executive  
E-mail murraydes@northlan.gov.uk Telephone 01698 302350 
Executive Summary
The Plan for North Lanarkshire was established in 2019 with a very clear vision - inclusive
growth and prosperity for all to bring equal benefits and a fairer distribution of wealth to all
North Lanarkshire’s people and communities. 
This vision is about transforming the place that is North Lanarkshire. It’s about enhancing
local physical environments in a way that recognises the intrinsic social and health benefits
gained in doing so. It’s about securing holistic ways of working that integrate policies, services,
and systems with only one solution in mind - to target the growing complexities in society and
improve outcomes for the people and communities of North Lanarkshire.
Approved by Policy and Strategy Committee in March 2023, the five year Programme of Work
to 2028 set out the plans to deliver these improvements against seven priorities. With delivery
of the Programme of Work reaching its mid-way point, this report herewith follows on from the
interim progress report to Committee in September 2024 to highlight latest progress and key
achievements.
Appendix 1 shows the progress being made in delivering a wide range of programmes,
projects, and activities and demonstrates the alignment across the Programme of Work in
terms of the one place one plan one council approach. Key achievements are summarised
below and include: 
• Good progress being made in terms of five new community hubs - where construction
has started on site at St Kevin's Community Hub in Coatbridge and at Gartcosh
Community Hub in the Northern Corridor, with Chryston High extension and 3rd sector
early years in the Northern Corridor scheduled to commence in the spring of 2025. Works
at Orbiston Community Hub in Bellshill are progressing on schedule with St Stephens
Community Hub in Coatbridge expected to come on board soon.
• The 65th new supply programme development starting on site to deliver another 26 new
homes for social rent. This brings the total delivered to date through the new supply
programme to 2,393 to further support the regeneration of local communities and town
centres, create jobs, and boost the local economy.
• The 800th property purchased under the open market purchase scheme to increase the
supply of affordable homes for rent and address housing needs and support the
regeneration of local communities.
• 90% completion of phase 1 of the tower reprovisioning programme (comprising 1,750
Policy and Strategy Committee
Delivering the Programme of Work to 2028 - key achievements
Item 3
Page 13 of 290

Page 14

flats), with phase 2 underway (964 flats) and progressing well in terms of re-housing
tenants.
• Marking the 10 year anniversary of City Deal from which North Lanarkshire has benefitted
significantly from investment that has contributed to the creation of MediCity beside the
M8, the Glenboig Link Road, and the new transport hub at Motherwell Station - with the
remaining developments well underway in respect of construction of the East Airdrie Link
Road, access work to regenerate the Ravenscraig site,
sustainable transport improvements as part of the A8/M8 corridor access improvements
project, and the Orchard Farm roundabout project to support the development of key
business and industrial sites on the A8/M8 corridor.
• Creating 17.2 kms of active travel routes over the period of The Plan for North Lanarkshire
to date to help establish a network of safe, accessible walking / wheeling / cycling routes to
help people access employment, education, and leisure
opportunities, improve health and well-being, and reduce carbon emissions.
• Developing a new heritage and countryside trail, designed to showcase North
Lanarkshire's rich history through engaging stories and interactive experiences. Set
across 10 locations, this has been developed to attract tourists and locals to explore the
area as well as promote active lifestyles and health and wellbeing.
• Entering into a new major partnership with global infrastructure company HOCHTIEF to
deliver improvements, maintenance work and investment across local roads, footpaths,
car parks, bridges and underpasses, street lighting, traffic management
systems and winter maintenance, and related infrastructure. Securing such a
maintenance and improvement service plays a vital role in enhancing and sustaining the
foundations to support the place-based vision of The Plan for North Lanarkshire in terms of
enabling business, industry, and public transport to develop and benefit all residents
equally.
• Conducting the first trials of new materials designed to reduce carbon in the roads industry
through a partnership with Transport for West Midlands, Amey, and Colas, as part of
ADEPT Live Labs 2 (a three-year UK-wide programme funded by the Department for
Transport aimed at decarbonising the local road network). As part of the programme, a
centre of excellence for decarbonising roads has been developed to provide a platform for
the identification, development, and sharing of industry best practice for low carbon
materials.
• Establishing the Invest Here website ( https://www.investinnorthlanarkshire.co.uk/ ) to
capitalise on North Lanarkshire’s position at the heart of Scotland with excellent transport
links to support inward investment and show the range of opportunities available to
support new businesses and key industry sectors to plant roots and grow and support the
local economy. This is supported by the new Invest in North Lanarkshire advisory service
to provide bespoke advice to help streamline and accelerate the statutory consent process
for developers.
• Marking 25 years of supported employment in North Lanarkshire - since its inception the
service has transformed lives by empowering individuals with various abilities to achieve
their employment goals. Key to the success of supported employment has been fostering
strong community relationships, delivering key work programmes in local communities,
and working in partnership with the NHS and New College Lanarkshire on specific sites.
Support for senior phase pupils in Additional Support Needs schools, as well as care
experienced young people, has also helped find jobs.
• Being the first council in Scotland to achieve the Breastfeeding Friendly Scotland Local
Authority Award at the gold standard. This was followed by a win at the Cosla awards for
the initiative in the Tackling Inequalities and Improving Health and
Page 14 of 290

Page 15

Wellbeing category. Historically, North Lanarkshire has had one of the lowest
breastfeeding rates in Scotland but thanks to a focused three-year programme, the council
has worked to transform attitudes and create a supportive culture for breastfeeding. At
present 50% of babies are breastfed at the 10-14 day old review, with the breastfeeding
rate at 6-8 weeks thereafter increasing from 23.1% to 30.4% over the period of The Plan
for North Lanarkshire.
• Updating various strategies to provide a clear direction for delivery of services and
supports that have a direct impact on the people and communities of North Lanarkshire -
this includes a new Corporate Parenting Strategy, North Lanarkshire Carers Strategy,
Health and Social Care North Lanarkshire Engagement and Participation Strategy, Tenant
Participation Strategy, and a Temporary Accommodation Strategy.
• Delivering a range of technological developments to further support connectivity and digital
inclusion across North Lanarkshire, including:
- A chat bot functionality on the council’s website to enable residents to receive
automated responses or chat to an advisor. From October to December 2024, 7,960
engaged sessions took place with 70% being resolved by the chat bot.
- Extension of public wi-fi with over 80 community locations now operational and over
42,000 individual registered users. This averages 14,000 connections per day with a
peak of 3,500 concurrent users. This follows previous updates reporting on wi-fi
connectivity within Motherwell Library and the Time Capsule, community hubs, and all
secondary schools now being fully operational.
- Three more immersive experience facilities now in operation at Motherwell Library,
Summerlee Heritage Centre, and Airdrie Library to add to the innovative experience first
launched at Muirfield Community Centre. These create opportunities for communities,
staff, and partners in many aspects, including digital skills development, health and
wellbeing improvement, social skills development, educational attainment, and
pathways to future learning and employment.
- Expansion of the inter-generational project that encourages older residents to use
technology to enrich their lives and support social inclusion through one-to-one training
with young people from local schools which also helps to improve confidence and
social skills.
- Smart lighting and Internet of Things pilots deployed to Palacerigg and Strathclyde
Country Parks, incorporating CCTV and public wi-fi, to support community safety,
connectivity, and provide local park management data on areas of usage to help inform
future service delivery.
- An increase of processes / services available for public interaction on the council
website from 50 at the last update to now include MOT / taxi compliance, roads and
streetlighting reports and requests, waste service requests, traffic signal reports, and
the ability to apply and pay for permits and business grant applications online.
• Concluding various public and stakeholder feedback events on many significant local
developments to allow residents to provide their views and shape the next steps,
including:
- The first stage of consultation taking place with local residents to develop the
Cumbernauld Town Masterplan which ran for six weeks and included an exhibition
showing how the town centre could look through concept designs. Most feedback was
supportive of the regeneration plans and wanted a town centre to be proud of. This was
followed by the first steps to regenerate Cumbernauld town centre as contractors go on
site to demolish Fleming House. This kicks off the 15-year plan to regenerate the town
centre to create a new town hub with education, health, community and leisure
facilities, public transport improvements, and modern bespoke retail and commercial
outlets.
- Residents being invited to share their views for a new Local Transport Strategy that
Page 15 of 290

Page 16

will shape how the infrastructure is developed and maintained across North
Lanarkshire over the next ten years. The Strategy also aims to support national efforts
to reduce car use, lower carbon emissions, and promote active travel, such as walking,
wheeling, and cycling.
- Resents also being invited to share their views on places in North Lanarkshire - homes,
recreation, access, transport, employment, and services - as part of the preparations
for the next Local Development Plan, which will decide where things like homes, shops,
businesses, and amenities are built.
- Public consultation on the updated design for the East Airdrie Link Road (as part of the
Glasgow City Region City Deal) to demonstrate the location of junctions, roundabouts,
and bridges and show the reduced impact on land and properties. This is designed to
improve journey times and transport reliability, air quality, and connections between
residential areas, town centres, business centres, employment, and education by
relieving congestion along the existing A73.
- Residents, partners, and local organisations being asked for their input to
understand digital needs and preferences for two new digital zones in local facilities (at
the Buchanan Centre in Coatbridge and Chryston High School). Digital zones will be a
dedicated space equipped with technology and resources to help people improve their
digital skills, get involved online, and feel more confident and digitally included.
- The conclusion of a significant programme of public engagement in respect of the first
phase of Rediscovering Airdrie. This programme aims to restore and repurpose
heritage assets, improve the townscape, and increase community pride and awareness
of local heritage in order to further promote North Lanarkshire an attractive visitor
destination. This enables next steps development of plans and a funding application to
support implementation of the programme.
• Delivering many community benefits which have been derived through Programme of
Work activities - such as providing jobs and training through the new supply programme,
creating opportunities for local businesses and supply chains through large scale
regeneration programmes, targeted training and recruitment for pupils with additional
support needs, and summer placement programmes for young people about to leave
school. Financial benefits have also been gained such as donations from various groups
to build beds for disabled plot holders and to work with young people living in deprived
areas, with non-financial support received from contractors donating training, time, and
excess materials for local projects.
• Further developing the use of the three new hubs already built and in operation over the
period of The Plan for North Lanarkshire. These hubs are now seeing delivery of
integrated and inclusive whole family support accessible at the heart of local communities.
Activities being delivered from hubs also includes partnership working in relation to
employment pathways, community learning and development, and health improvement.
• Growing the council tax income base by adding 4,853 housing properties over the
duration of The Plan for North Lanarkshire, with 346 properties to the non-domestic rates
income base over the same period.
• Achieving a successful Best Value audit for the second year in a row as part of the new
national approach. The 2024 audit focussed on workforce innovation and recognised that
the council’s workforce planning approach is integrated with The Plan for North
Lanarkshire, has a focus on developing the workforce of the wider North Lanarkshire area,
and is supported by robust service workforce plans. The audit report also notes that the
council is proactive in developing its workforce as well as that of the wider North
Lanarkshire area and works across a range of partnerships to deliver services for
communities.
Page 16 of 290

Page 17

The transformation of North Lanarkshire to date has been able to be realised through decisions
made by the council’s committees that have been unwavering in their support to not just deliver
the Programme of Work, but to ensure it is delivered with a greater focus on scale and purpose
that escalates positive changes in a way that improves the lives of the people and communities
of North Lanarkshire.
These deliverables have been consistently underpinned by Policy and Strategy Committee
approval of the Medium-Term Financial Plan 2025/26 to 2029/30, the Strategic Capital
Investment Programme for 2024/25 to 2028/29 (bolstered by the Community Investment
Fund), and the One Workforce Plan. This supports the one place one plan one council
approach to the transformation of North Lanarkshire to progress at pace and scale in order to
improve the lives of local people, while ensuring activities are underpinned by sound financial
management, risk management, and corporate governance controls to ensure the council
remains financially sustainable. 
The accompanying report on the agenda today provides an updated North Lanarkshire context
in respect of the 28 health check indicators as well the recently published Census results to
form a wider bank of evidence to help inform the key challenges and next steps looking forward. 
Recommendations
It is recommended that the Policy and Strategy Committee:
(1) Take cognisance that this report provides a further progress update on delivering the
Programme of Work to 2028 in line with the strategic oversight role of the Policy and
Strategy Committee and as per the commitment set out in the report in March 2024, and
(2) Continue to endorse their key role in ensuring the continuing commitment to delivering
The Plan for North Lanarkshire through the Programme of Work and ensuring strategic
oversight in terms of its ongoing development, co-ordination, and monitoring. 
The Plan for North Lanarkshire
Priority All priorities
Ambition statement All ambition statements
Programme of Work All Programmes of Work
1. Background
1.1 Members of the Policy and Strategy Committee are well versed in The Plan for North
Lanarkshire and its vision for North Lanarkshire to be a place of inclusive growth and
prosperity for all which brings equal benefits and a fairer distribution of wealth to all North
Lanarkshire’s people and communities. 
1.2 As the delivery vehicle for The Plan for North Lanarkshire, the Programme of Work has
(since 2019) enabled a dynamic strategic planning process that has stabilised the
strategic direction of the council, while allowing for appropriate flexibility in the
operational delivery of many complex inter-connected programmes, projects, and plans.
The consistency of the Policy and Strategy Committee’s long-term commitment to the
one plan direction through the Programme of Work has led to significant
Page 17 of 290

Page 18

achievements which have been pivotal in transforming North Lanarkshire as a place
and maximising its potential as the place to live, learn, work, invest, and visit.
1.3 Following Policy and Strategy Committee approval of the new Programme of Work to
2028 in March 2023 (and the subsequent deliverables and plans in September 2023 and
March 2024 respectfully) the way forward for The Plan for North Lanarkshire is very
much focussed on further strengthening a single integrated one place one plan one
council approach. This is considered critical to ensure a greater focus on scale and
purpose in order to escalate significant place based transformational change across all
local communities equally and deliver positive and sustainable change that improves the
lives of the people and communities of North Lanarkshire. 
1.4 As noted in the report to Policy and Strategy Committee in March 2024, delivery of the
Programme of Work to 2028 would continue to be monitored throughout its lifespan
through the supporting Single Integrated One Council Delivery Plan and established
governance arrangements. A key part of this is the ongoing role of the Policy and
Strategy Committee to maintain their strategic oversight role of the overall Programme
of Work to 2028 in relation to “development, co-ordination, and monitoring of The Plan
for North Lanarkshire” and to keep under review such “programmes as the Committee
considers necessary to achieve the council’s long-term aims and objectives”.
1.5 This report, and the information set out in Appendix 1 attached, therefore provides the
next in the series of progress updates on the delivery of the Programme of Work to
2028 for the strategic oversight of the Policy and Strategy Committee. Key
achievements are summarised in the executive summary for ease of reference. 
2. Monitoring delivery of the Programme of Work to 2028 
2.1 Throughout 2024/25 the Single Integrated One Council Delivery Plan has been
monitored by the Programme of Work Strategic Boards through a corporate monitoring
process applied consistently across all seven Programme of Work priorities. This
process requires the respective Project Manager / Activity Lead to provide an update
quarterly to assess if delivery is within six dimensions (scope, cost / budget, quality,
resources, risk, and within time / on schedule). An assessment also requires to be
made in terms of the % completed status of each project / activity.
2.2 An overview of progress in delivering the seven Programme of Work priorities is set out
in Appendix 1. This assessment summarises delivery against the high level deliverables
approved by the Policy and Strategy Committee in September 2023 and the RAG status
reflects the extent to which delivery is being achieved across the six dimensions noted
in paragraph 2.1 above. The latest position is summarised below. 
• 94% of the actions in the delivery plan supporting the high level deliverables have
commenced to the initial stages (this is an increase from 90% as at the progress report
in September 2024), 6% are not yet due to start.
• Of those commenced:
- 22% of delivery plan actions are complete or at the final closure stage (an increase
from 9% as at the progress report in September 2024).
- 78% of delivery plan actions have reached the delivery and ongoing management
and monitoring stage (an increase from 68% as at the progress report in
September 2024).
• In terms of delivery within the six dimensions (i.e. scope, cost / budget, quality,
resources, risk, and within time / on schedule) - of those commenced:
Page 18 of 290

Page 19

- 22% of the delivery plan actions have been assigned a Blue RAG status.
- 64% of the delivery plan actions have been assigned a Green RAG status.
- 14% of the delivery plan actions have been assigned an Amber or Red RAG
status; additional commentary is included in the update provided in Appendix 1. 
2.3 The management and monitoring of the Programme of Work through the Strategic
Boards is supported by a formal change process which includes ensuring Policy and
Strategy Committee are aware of any changes to the deliverables originally approved
in September 2023. Any changes made since the last report are noted in Appendix 1
against the respective Programme of Work.
Next steps
2.4 As per the council’s Corporate Risk Register for 2024/25 approved at the Audit and
Scrutiny Panel in August 2024, the managing strategic change risk has been reframed
into a new risk relating to the delivery of the approved programme of work. This is in
the final stages of development to support implementation of the council’s Risk
Management Strategy by further embedding a risk aware rather than risk averse
approach across the Programme of Work and ensuring that key operational decisions
at Strategic Board level are taken with an understanding of risks and their effective
controls. 
2.5 Prior to the development of the new five year Programme of Work to 2028, an annual
review process supported the development of the single year Programme of Work to
ensure that the priorities for delivery remained framed within the most up to date
demographic, social, and economic context that exists for the place that is North
Lanarkshire, as well as the latest national policy developments and priorities. To ensure
the Programme of Work to 2028 continues to remain current, relevant, and deliverable
- and takes into account the latest context available from not only the 28 Health Check
Indicators, but also the recently published Census results - a mid-term review is
underway with the outcome scheduled to be reported back to the Policy and Strategy
Committee in cycle 4 of 2025. This wider bank of evidence will help to inform the key
challenges and next steps looking forward.
2.6 Traditionally the Policy and Strategy Committee have received an update to the
Strategic Policy Framework in cycle 1 each year at the same time as the suite of
Programme of Work reports. As the Strategic Policy Framework is now well established
and aligned to The Plan for North Lanarkshire, any significant changes from year to
year are captured in the Programme of Work as a matter of course. To ensure ongoing
alignment though, any key points arising from the policy framework review programme
will be reflected within the mid-term Programme of Work review noted in paragraph 2.5. 
2.7 The duty of Best Value is aligned to the Accounts Commission’s Statutory Direction
which directs councils in terms of the “publication of information as to standards of
performance”. To fulfil this duty a new three year Statutory Direction has been
published for 2025/26 reporting onwards and, to ensure compliance with the more
frequent reporting requirements set out therein, six monthly progress updates will
continue to be provided to the Policy and Strategy Committee moving forward. This will
both support the Policy and Strategy Committee to maintain their strategic oversight role
of The Plan for North Lanarkshire and Programme of Work to 2028 (in line with the
Scheme of Administration), as well as ensure the council fulfils its statutory duty in
relation to highlighting the impact of activities delivered in line with the Programme of
Work priorities.
2.8 Quarterly progress monitoring will continue to be undertaken by each of the Programme
Page 19 of 290

Page 20

of Work Strategic Board to ensure ongoing monitoring and management of the delivery
of the Programme of Work in line with the six dimensions (scope, cost / budget, quality,
resources, risk, and within time / on schedule) within which it is being delivered along
with the % completed status assessment. 
3. Measures of success
3.1 Measures of success will be evidenced through progress being made to deliver the
Programme of Work and ensure the council’s portfolio of programmes, projects, plans,
and activities impact positively on the North Lanarkshire context (evidenced through
the 28 Health Check Indicators) and thereby achieve the long-term vision of inclusive
growth and prosperity for all (as set out in The Plan for North Lanarkshire). 
4. Supporting documentation 
4.1 Appendix 1 -  Summary of progress in delivering the Programme of Work to 2028. 
Des Murray
Chief Executive 
Page 20 of 290

Page 21

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts been discussed and agreed with
Finance?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☒ No ☐
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
The Local Government Act 1992 established the role of the Statutory Direction to
direct the “publication of information as to standards of performance”.
The Local Government in Scotland Act 2003 introduced the duty of Best Value; this
requires that councils “make arrangements to secure continuous improvement in
performance”.
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal
data?
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk
Yes ☐ No ☐
Page 21 of 290

Page 22

5.6   Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes   ☐ No ☒
If Yes, please provide a brief summary of the impact?
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)?
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Work to ensure ongoing monitoring of Programme of Work delivery and assess if
delivery is within the dimensions of scope, cost / budget, quality, resources, risk,
within time / on schedule, and % completed status - and ensure that all
stakeholders are informed of progress in line with their respective roles -
contributes towards mitigating the risks on the Corporate Risk Register for the
governance, leadership, and decision making risk and the managing strategic
change risk which has been reframed to reflect the risk in relation to delivery of the
approved programme of work.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out?
Page 22 of 290

Page 23

Yes ☐ No ☐
Page 23 of 290

Page 24

Appendix 1
Summary of progress in delivering the Programme of Work to 2028 
Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)
Transforming Places
Town and
community hubs
Complete 6 new build Town and
Community Hubs, a £35m
extension to Chryston High, and up
to 18 schools / buildings extended
or upgraded to Hubs by 2028 (and
progress design development of a
further 3 for delivery post 2028) to
support the council’s asset
rationalisation and maximise the
efficiency of the asset portfolio in
transitioning to a new operating
model that will lead to more
positive outcomes for children,
communities, and the economy
across North Lanarkshire.
Mar-23 Mar-27 Green At delivery and
ongoing
management
and monitoring
stage.
• Construction work has started on site St Kevin's Community Hub in
Coatbridge.
• Construction works are progressing well with steelwork erection works
now complete and floor slabs, steel framing system, windows and
roofing works ongoing at Orbiston Community Hub in Bellshill, with
mechanical and electrical works due to commence.
• Planning approval has been obtained for St Stephens Community Hub
in Coatbridge, with the contract anticipated to be let early in 2025.
• Planning approval obtained and contract approved at committee and
work started on site at Chryston High extension and 3rd sector early
years creation in the Northern Corridor.
• Water vole relocation has started and SPEN substation move for pitch
(planning condition) is progressing at Gartcosh Community Hub in the
Northern Corridor. Expected to commence on site early in 2025.
New supply
programme
Deliver 2,000 new council homes
between 2023 and 2028 and a
further 1,354 by 2035 to help meet
housing need and support town
centre and community
regeneration.
Apr-23 Mar-35 Green At delivery and
ongoing
management
and monitoring
stage.
• 2,393 new homes delivered as at December 2024, including 461 in
2023/24.
New supply
programme
Review and update the New
Supply Programme delivery plan to
identify potential opportunities to
accelerate / enhance the
programme and explore alternative
tenure options to support economic
and population growth.
Mar-24 Oct-24 Blue Completed or
at closure
stage.
• Review completed and report to expand the programme by a further
1,000 homes prepared for consideration at the Housing Committee in
cycle 1 of 2025 which was approved.
Local
Development
Plan
Develop a new Local Development
Plan to support and facilitate future
development in the right locations
to help attract investment in new
homes and businesses and
support sustainable communities
Jan-24 Mar-28 Green At initiation
stage.
• Work has started to prepare the next Local Development Plan - North
Lanarkshire Local Development Plan 2 (NLLDP2). This is a statutory
document that sets out the policies and proposals for land use and
development in North Lanarkshire.
• The timeline for the preparation of the Plan is set out in the
Development Plan Scheme and Participation Statement, with the
Page 24 of 290

Page 25

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber) 
and employment.     adoption of NLLDP2 expected in 2027/28.
• A range of topic papers have been developed and are available on the
council’s website as part of the consultation exercise, and face to face
public engagement will commence in February 2025.
Open Space
Strategy
Complete an Open Space Audit
and develop an Open Space
Strategy, including sports pitch
strategy, to help ensure local
communities have access to good
quality, well maintained open space
to meet their needs.
Jan-22 Mar-25 Amber At delivery and
ongoing
management
and monitoring
stage.
• Open space audit completed (1,564 sites). Draft Open Space
Strategy is behind schedule, but due to go out to public consultation in
March 2025.
Local Transport
Strategy
Develop a Local Transport Strategy
to help prioritise available
investment to ensure communities
can access employment, education
and leisure opportunities, support
inclusive economic growth and
contribute to reducing carbon
emissions.
Jun-24 Feb-26 Green At planning and
set up stage.
• Policy review and baseline evidence gathering completed. Public and
stakeholder consultation commenced 18th November 2024 with a
closing date of 17th February 2025. The stakeholder consultation
exercise has also included five online workshops, nine drop in
sessions, and an in person meeting with the Youth Parliament.
• Strategic environmental assessments have been drafted.
• The analysis from the public and stakeholder consultation exercise will
inform the next steps developments for the Strategy which is
scheduled to be reported to committee in cycle 1 of 2026.
Active travel Create 50 kms of active travel
routes by 2028 to help establish a
network of safe, accessible walking
/ wheeling / cycling routes to help
people access employment,
education, and leisure
opportunities, improve health and
well-being, and reduce carbon
emissions.
Jun-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• 17.2kms of active travel routes created between 2019/20 and
2023/24.
• Work progressing or planned on a number of strategic projects
including Motherwell town centre, Alexander Street in Wishaw,
Glasgow Road in Wishaw, Orbiston Hub in Bellshill, Riverbank Hub in
Coatbridge, and Belziehill roundabout in Bellshill.
City Deal Deliver the City Deal programme to
improve connectivity and help
support inclusive economic growth.
Apr-23 Apr-31 Green At delivery and
ongoing
management
and monitoring
stage.
• Work progressing on delivery of City Deal Programme includes the
following:
- East Airdrie Link Road - first draft alignment (preliminary design fix
1) complete, and public and landowner engagement taken place.
- Ravenscraig access improvements - demolition works complete
and value engineering underway to finalise detailed design for
inclusion in tender package.
• Regular updates on the current status of the North Lanarkshire City
Deal infrastructure programme are reported to Enterprise and Fair
Work Committee, with the latest in November 2024 (link).
Business and Develop Business and Industry Mar-23 Mar-28 Amber At delivery and • Work underway on development of a Business and Industry Strategy Page 25 of 290

Page 26

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)
industry Strategy including review of
available sites, and progress a
minimum of 5 projects to
remediate, develop, or improve
sites to help create new
employment opportunities.   
ongoing
management
and monitoring
stage.
linked to development of the new Local Development Plan.
• At Braidhurst Industrial Estate in Motherwell improvement works are
nearing completion to improve and expand available industrial space.
• Fusion Assets are progressing works to create new industrial space at
Gartcosh, Ravenscraig, Link Park at Newhouse, and Condor Park at
Eurocentral.
Town centres Develop Town Action Plans for
each town centre in line with the
agreed Town Visions (completing 3
town action plans in 2023/24 and 4
in 2024/25) and progress delivery
to help create sustainable mixed-
use centres that will attract
investment in new employment and
housing opportunities.
Oct-23 May-25 Green At delivery and
ongoing
management
and monitoring
stage.
• Town Action Plans for Airdrie, Motherwell, Wishaw, Bellshill, Kilsyth,
and Shotts were developed following public consultation and have
been approved by the Enterprise and Fair Work Committee.
• £19.5m awarded by UK Government over ten years for Coatbridge.
Town Board established. Awaiting revised guidance from UK
Government to finalise the investment plan for the first three years (i.e.
2026/27 to 2028/29).
Town centres Develop Delivery Plan for
Cumbernauld Town Centre
regeneration and progress
redevelopment plans and
demolition of the Centre
Cumbernauld.
Change: Deliverable wording
amended to reflect delivery plan.
Jun-23 Mar-33 Green At initiation
stage.
• First stage of consultation and engagement with businesses and the
public has been completed, including a drop in exhibition within the
library. More than 1,600 people visited the consultation pages online,
with 263 surveys completed and 438 people discussed the plans with
council officers at the library exhibition. Most people who visited the
exhibition and spoke to council officers were supportive of the
regeneration plans and wanted a town centre to be proud of.
• Demolition of Fleming House is progressing and plans for the
demolition of the shopping centre are on track (estimated to start in
2027).
• Procurement of managing agent progressing.
Towers strategy Complete phase 1 Tower re-
provisioning programme of 1,750
flats by 2025/26, and progress
phase 2 comprising 964 flats.
Jul-22 Dec-34 Green At delivery and
ongoing
management
and monitoring
stage.
• Demolition of all remaining blocks has been completed at
Gowkthrapple Low Rise (following delay due to nesting birds) and site
clear up will now take place.
• Pre demolition surveys are all complete and reports on findings
received for Allershaw Tower.
• Contractor has commenced initial site clear up works to enable the
demolition works to commence at Jackson Court.
• Pre-demolition surveys instructed to inform the specification that will
be included in the tender for the works at Dunbeth Court.
• Cladding removal is programmed to be complete at Allan and Draffen
Towers by March 2025 (weather permitting). Surveys at Coursington
Tower are ongoing.
• Phase one rehousing existing tenants is 90% complete; Birkshaw and
High Coats delayed due to Ukrainian resettlement programme.
Page 26 of 290

Page 27

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
• Phase two now under way and good progress being made re-housing
tenants.
Re-discover
Airdrie
Invest in cultural and heritage
assets, including Summerlee and
Rediscovering Airdrie heritage
initiative, to increase community
pride and awareness of local
heritage and make North
Lanarkshire an attractive visitor
destination.
Jan-24 Jan-25 Blue Completed or
at closure
stage.
• Engagement with local community and groups now complete (with
links made to wider opportunities in Airdrie area) as is engagement
with residents, the community board, and local groups.
• Consultant appointed, site visits underway, and plans for development
are being prepared to identify the physical interventions required to
restore and repurpose heritage assets and improve the townscape.
• The conclusion of this first phase of Rediscovering Airdrie with a
significant programme of public engagement has enabled the
development plan and application for final funding to be submitted
early in 2025 to support implementation of the next steps.
Celebrate
Summerlee
Invest in cultural and heritage
assets, including Summerlee and
Rediscovering Airdrie heritage
initiative, to increase community
pride and awareness of local
heritage and make North
Lanarkshire an attractive visitor
destination.
Jan-24 Jun-25 Green At delivery and
ongoing
management
and monitoring
stage.
• Programme of engagement events underway with local schools,
groups, and wider interest groups and engagement with local people
has gathered many stories and objects to enable a complete
catalogue of research and materials to now be in place.
• Initial work has taken place to prepare vision plans with some
engagement with visitors to determine areas of interest. Consultant
still to be appointed - linked to decisions with Coatbridge Town Board.
Increase
community pride
through cultural
heritage
development
Invest in cultural and heritage
assets, including Summerlee and
Rediscovering Airdrie heritage
initiative, to increase community
pride and awareness of local
heritage and make North
Lanarkshire an attractive visitor
destination.
Jan-24 Dec-27 Green At delivery and
ongoing
management
and monitoring
stage.
• Heritage Outreach Officer now in post.
Invest in North Lanarkshire
Establish a small multi-disciplinary team, comprising
planning, roads, estates, enterprise, protective
services, building standards, and legal, to deliver a
Pilot project to provide an enhanced and co-ordinated
advisory service to developers and prospective
investors to help improve / streamline the statutory
consent process and maximise potential economic
benefits.
Sep-23 Dec-23 Blue Completed or
at closure
stage.
• Pilot project completed and evaluation undertaken, and feedback used
to inform the next steps.
Based on learning from the Pilot and wider market
engagement, review and develop proposals for an
Feb-24 Dec-24 Blue Completed or
at closure
• Stakeholder engagement and review of good practice from elsewhere
completed. Development completed in respect of the future operating Page 27 of 290

Page 28

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)
effective future operating model to make best use of
available resources, including charging for the
enhanced Pre App service, and streamlining the
process for obtaining statutory consents.   
stage. model, including proposed fees and performance measures, and to
progress any necessary approvals for changes to staffing. Manager
to lead team now in post and team established.
Develop a Gate Check process for all major council
investment projects, where statutory consents
required, to ensure projects get the necessary input
from relevant services at an early stage and avoid
potential increased costs and/or delays at a later
stage.
Feb-24 Sep-24 Blue Completed or
at closure
stage.
• Gate check process completed following consultation with relevant
internal stakeholders and incorporated within project management
guidance and relevant project approval processes.
Support delivery of allocated sites within the Local
Development Plan through development of effective
delivery plans.
Mar-24 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• This activity has been incorporated within the future operating model
considerations for the Invest in North Lanarkshire team.
Co-ordinate development of masterplans /
development briefs and appraisal process for major
council owned development sites.  
Blue Completed or
at closure
stage.
• As an ongoing business as usual area of work, the development for
masterplans, development briefs, and the appraisal process for major
council owned sites will be undertaken as and when sites become
available.
Review and develop process for the co-ordination of
inward investment / business growth enquiries,
including development of Customer Relationship
Management (CRM) system.
Mar-23 Mar-24 Green At delivery and
ongoing
management
and monitoring
stage.
• The CRM system - to record and better co-ordinate business
engagement and growth enquiries and measure outcomes - went live
during June 2024 and enquiries are now being directed to the new
system which links to Bis Account. Staff training and user manuals
completed, and enquiries are starting to come in from businesses.
Final steps will see system embedded as business usual with reports
produced from the system.
Sustainable Futures
Energy efficiency
and generation
Develop a route map to net zero
that incorporates climate resilience
(adaptation) and provides strategic
actions as to how the council will
move to net zero (including outline
costs where possible, timeframe,
review periods.) 
Change: In October 2024, it was
approved through Sustainable
Futures to remove the following
deliverable from being a self-
Jan-24 Dec-25 Amber At planning and
set up stage
• Work on a climate plan - the Net Zero Pathway - is underway.
• Developing the pathway with costed actions will be challenging in
terms of the complex nature of this deliverable. This includes
progressing the actions within an uncertain financial climate.
Page 28 of 290

Page 29

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber) 
standing action and to incorporate
it into the pathway to net zero
project/activity (i.e. the deliverable
referred to is to prepare and deliver
a resourced Climate Adaptation
Plan, including biodiversity
enhancements, in order to enhance
the council's resilience to the
current and future changes in the
climate and respond to the
ecological crisis).     
Energy efficiency
and generation
Undertake research with a potential
energy partner to explore
renewable energy and hydrogen
generation projects as commercial
opportunities in North Lanarkshire.
This will include examining the
business case for the delivery of
larger scale energy generation /
hydrogen production and the
delivery of smaller energy projects,
including the introduction of solar
farms on closed landfill sites and
energy storage options adjacent to
electrical sub-stations.
Nov-22 May-26 Amber At delivery and
ongoing
management
and monitoring
stage.
• This aims to establish and implement solar meadows at Auchinlea and
Dalmacoulter closed landfill sites and work with the energy providers
to agree the next steps. Work continues to progress towards planning
permission at these sites which require a full Landscaping Visual
Impact Assessment and detailed breeding bird surveys to be
undertaken. In addition, ecological surveys are also due to in the first
quarter of 2025.
Energy efficiency
and generation
Improve asset sustainability
through the development of the
Live Labs 2 project to deliver more
sustainable road surfacing, deliver
a social enterprise pilot for
environmental services, and
increase recycling facilities across
the area.
Apr-22 Mar-27 Green At delivery and
ongoing
management
and monitoring
stage.
• Work to upgrade and improve communal recycling points / nodes to
improve customer service, decrease contamination, and increase
waste recycling delivery and installation of bins at all identified sites is
complete and monitoring of quality of waste ongoing.
• To identify new material innovations used within road construction that
use less carbon (i.e. Live Labs 2 decarbonisation of roads) and
develop a review process that is supported and used by the industry
the first trials of new materials designed to reduce carbon in the roads
industry have taken place in North Lanarkshire. Working in
partnership with Transport for West Midlands, Amey and Colas, as
part of ADEPT Live Labs 2 (a three-year UK-wide £30 million
programme funded by the Department for Transport) aims to
decarbonise the local road network. Page 29 of 290

Page 30

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
• As part of the programme, the partners have created the Centre of
Excellence for Decarbonising Roads (CEDR), which will provide a
platform for the identification, development, and sharing of industry
best practice for low carbon materials. In 2024 the live trials took
place with a range of innovative materials to reduce carbon in the
roads industry: a surface rejuvenator which aims to extend the life of
the road; products to repair potholes; road marking materials; and a
biogenic asphalt solution all of which reduce the carbon footprint of
road maintenance operations.
• In addition, CEDR has assessed a push-off trailer that is used to
transport hot material from the quarry to site and this has higher levels
of insulation than traditional vehicles. Regular inspections of the trial
sites are ongoing to monitor the condition and performance of each
product over time. Other trials are planned with an anti-icing additive
for asphalt designed to prevent ice forming on pavement surfaces,
reed-based signage material, and the latest asphalt materials.
• A report was submitted to the Environment and Climate Change
Committee in October 2024 (link) providing an update in respect of the
Live Labs project.
• Alternative solutions to upgrade the council's recycling centres to
enable the acceptance of tipper vehicles and meet statutory
obligations in terms of the persistent organic pollutants’ legislation
have had to be scaled back due to lack of funding. Alternative options
are currently being investigated. Additional resources are also
required to provide dedicated separate additional collections for fly-
tipped materials and separate bulky waste collection service from
households. This is currently being carried out using additional cost
resources; a service review is underway that will also consider the
need for additional capacity.
Energy efficiency
and generation
Explore green energy funding
options which will assist in the
move towards net zero, for both
council assets and businesses
within North Lanarkshire.
Feb-24 Mar-25 Blue Completed or
at closure
stage.
• The net zero Business Challenge Fund was launched to enabled
small to medium sized enterprises to bid for up to £15,000 funding in
order to reduce emissions and make their operations more
sustainable.
• The budget for the Net Zero Fund was £250,000 and during the year
there were two rounds of funding, and both were over-subscribed. At
the end there was only a £1,367 underspend due to grant values
allocated.
• A total of 17 projects were funded with a diversity of project types
ranging from installation of solar panels to more innovative solutions,
new product development and process solutions.
• Work is underway to follow up with each of the 17 businesses to
Page 30 of 290

Page 31

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
identify the outcomes and improvements gained from the awards.
• Moving forward the Challenge Fund will now be implemented with the
main grant funds from 1st April 2025.
Energy efficiency
and generation
Deliver low carbon North
Lanarkshire assets through the
delivery of Local Heat and Energy
Efficient Strategy (LHEES), Energy
Efficiency Standard for Social
Housing (EESSH), decarbonisation
of the council transport fleet,
introduction of electrical vehicle
charging infrastructure across
North Lanarkshire, and introduction
of a waste transfer station and
material recovery facility.
Apr-21 Dec-45 Amber At delivery and
ongoing
management
and monitoring
stage.
• The council published the North Lanarkshire Local Heat and Energy
Efficiency Strategy (LHEES) to meet the statutory deadline. The next
phase of this project involved appointment of the LHEES / Network
Officer to progress and develop the Delivery Plan.
• Net zero led transformation of the visitor gateway at Strathclyde Park
is being redesigned to meet the available budget. Design works have
progressed, and a stage 1 report is anticipated early in 2025. This is
key to finalising technical details of the design which will help the
working group confirm accurate costings, timings, and anticipated
energy saving outputs which are critical for future grant applications.
• Work to develop and deliver energy efficiency projects within the
council's non-domestic buildings via the non-domestic Energy
Efficiency Framework is on schedule and within budget. The
remaining energy conservation measures will be delivered by the end
of February 2025.
• All lighting in Summerlee Heritage have been replaced with LEDs.
Combined heat and powers have been recommissioned at four sites
and are operational. Building energy management system (BEMS)
optimisation is complete for all project sites. BEMS upgrade on three
sites is now complete.
• To implement a vehicle replacement programme to assist the council
in meeting its low or zero emission targets and consider potential
alternative fuel options, a five year plan will focus on improving the
efficiency, utilisation, and reduction in operational downtime as well as
minimising the environmental impact and setting measurable goals for
reducing the fleet’s carbon footprint.
• Funding allocated in respect of the Glasgow City Region electric
vehicle charging infrastructure proposal to establish the best approach
for the council (including delivery of the Eco Hub at the Bellshill depot)
is being reconsidered, along with alternative funding models, to
ensure delivery can be met.
• A contractor has been appointed on behalf of all local authorities to
extend, operate, and maintain the council's electric vehicle charging
infrastructure, in partnership with the Glasgow City Region authorities
following committee approval received to enter into the collaboration
agreement.
• Funding allocated to investigate suitable sites to implement waste
streams for the council (before onward processing) along with a
Page 31 of 290

Page 32

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
Material Recovery Facility (MRF) in order to improve efficiency of the
service, reduce contamination, increase waste recycling, and reduce
costs is being reconsidered, along with alternative funding models, to
ensure delivery can be met.
• Funding allocated to ensure adequate charging infrastructure in place
at depots, offices, and hubs to accommodate the transition to zero
emissions is being reconsidered, along with alternative funding
models, to ensure delivery can be met. Capability and capacity
exercise completed and next steps to appoint a supplier are being
progressed.
• A report was submitted to the Environment and Climate Change
Committee in October 2024 (link) in terms of progress to net zero in
council housing stock. This included:
• Work underway to ensure that all council owned houses achieve a
minimum Energy Performance Certificate (EPC) rating of D by
December 2025. EPC band D properties have been identified and
an investment programme has been prepared in order to increase
the overall EPC rating where reasonably practical to do so, within
the parameters of costs and technical solutions available.
Currently identified E, F, G rated properties being updated as
desktop exercise where works undertaken to increase Standard
Assessment Procedure (SAP) rating and associated EESSH
compliance. Visits to addresses remaining E, F, G after updating
exercise planned to confirm rating and identify any works if
required.
• Work underway to develop and implement a plan to ensure that all
council owned houses achieve EPC rating of B, or to be as energy
efficient as possible, by December 2032. Route map to achieve
EESSH2 has been prepared and costed at £430m. The
programme towards achieving EESSH2 commenced in Jan 2021,
however changes to the criteria are awaited from the Scottish
Government to converge activities around EESSH and Net Zero
Carbon (NZC). Increased EPC rating through works including 120
properties with photovoltaic solar panels, 110 properties with
increased insulation works started. Increased EPC rating through
planned works including 180 properties with photovoltaic solar
panels, 170 properties with increased insulation works started.
• Work to develop and implement a plan to ensure that all council
owned houses have works carried out to support the council's plan
to achieve net zero status by 2045 including the decarbonisation of
all heating (e.g. replacement of gas heating with a net zero
Page 32 of 290

Page 33

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
system) has been prepared and costed and consideration is
currently underway to prioritise areas.
• £188m of energy efficiency related contracts were awarded in
November 2024 for gas systems renewals, windows replacement, and
external wall insulation.
• Following implementation of the Energy Audit Voucher scheme
(maximum grant value of £2,500) to enable small and medium-sized
enterprises to reduce their energy bills or improve how they use their
energy, vouchers have been awarded to six companies (totalling
£13,750). A further four have been approved and are awaiting
evidence from businesses on completion to enable payment.
Businesses who have utilised the vouchers have found the audits to
be of great benefit to the company and have implemented in most
cases the findings of the reports. The scheme is currently under
review before moving forward with the next steps.
• The expert help scheme (which provides small and medium-sized
enterprises with up to five days of fully funded specialist business
advice on energy efficiency and net zero topics) has seen advice
provided to dix businesses at a value of £13,550. A new framework
(including a lot for energy advice / net zero) has been procured and a
new scheme will be prepared for implementation from 1st April 2025.
Climate
adaptation
Develop nature-based adaptations
which will centre around the
Country Parks for the Future
programme and the Clyde Climate
Forest.
Mar-20 Jul-35 Amber At delivery and
ongoing
management
and monitoring
stage.
• Currently seeking funding to deliver the remaining projects in the
country parks for the future programme. Large scale grant application
has been submitted to the National Lottery Heritage Fund for which a
decision is awaited.
• Implementation of an annual nature recovery programme - to deliver
habitat restoration, freshwater restoration, and eradication of invasive
non-native species negatively impacting on nature - has been
impacted by delays in funding and seasonal variation on availability of
contractors for some areas of work (e.g. bog restoration).
Confirmation has now been received that funding will carry forward to
2025/26, so procurement is underway for various contracts across
local nature reserves and other community greenspaces, watercourse
catchments, and school grounds.
• Work which has progressed includes the invasive non-native species
project which is complete along with corresponding training for
volunteers and staff as and treatment of such in local nature reserves
across North Lanarkshire. Biodiversity enhancements have been
made within four cemeteries, including the creation of wildflower
meadows, introduction of bird and bat boxes, improvements to surface
water management, and additional tree and hedge planting.
Page 33 of 290

Page 34

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
• Work continues in the Clyde Climate Forest City Region tree planting
project - which aims to increase tree cover in areas most likely to be
negatively impacted by climate change and see around 18 million
trees being planted in the city region over the next decade, increasing
woodland cover in the city region from 17% to 20%. Local areas that
have been enhanced include North Motherwell, Wishaw, and Bellshill.
Climate
adaptation
Improve North Lanarkshire's assets
to be climate resilient with a focus
on flood prevention measures.
Jan-22 Mar-34 Amber At delivery and
ongoing
management
and monitoring
stage.
• Work is ongoing to implement a tree risk asset management strategy,
including establishing the full extent and condition of assets and
enable a regime of proactive management. This includes work to
analyse ash dieback disease survey data for roadside trees. A report
to the Environment and Climate Change Committee in October 2024
(link) provided an update in respect of the work underway in line with
the Tree Risk Asset Management (TRAM) Strategy and work in
respect of ash dieback disease across the council’s tree assets. This
report also introduced the draft Woodland and Forestry Framework,
setting out the proposed management of woodland sites in council
ownership over the next 12 years.
• A new burial space strategy has been researched and developed. This
aims to deliver replacement cemeteries and extended cemeteries in
order to meet the council's statutory requirement to provide sufficient
burial space and to do so within a reasonable distance of each
community in order to tackle funeral poverty and enable bereaved
families to visit graves regularly and without undue cost. As delivery
of the strategy depends on suitable land availability, this aspect is
ongoing in respect of carrying out thorough site investigations to guide
site selection.
• A report to the Environment and Climate Change Committee in August
2024 (link) provided an update on burial space needs within North
Lanarkshire and actions proposed to provide sufficient new burial
space for each community. The report also updates committee on
improvement projects undertaken during the last year across active
cemeteries.
• Construction of a new cemetery at Pather Farm in Wishaw has
commenced as has work on site at Coltswood Cemetery to utilise
existing space within the cemetery. Site investigations are still being
undertaken to confirm site suitability for an extension to New
Monklands Cemetery.
• To deliver flood risk management and develop plans across the local
authority area - in accordance with the Clyde and Loch Lomond Local
Flood Risk Management Plan, to enable the council to reduce the risk
of flooding and meet its statutory obligations in terms of the Flood Risk
Page 34 of 290

Page 35

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
Management (Scotland) Act 2009 - a number of activities have been
completed. This includes award of professional services contract to
Atkins Realis which will identify existing infrastructure (such as trash
screens and culverts) that are key assets to managing flood risk
effectively, further progression of the Kilsyth Flood Risk Reduction
Scheme to outline design stage, and early contractor engagement
with Hochtief to derisk the construction phase of the project.
• A report to the Environment and Climate Change Committee in August
2024 (link) provided an update on progress to deliver Flood Risk
Management Plans throughout North Lanarkshire and sought
approval for the methodology of how resources are prioritised to
manage flood risk to areas of greatest need (using the progression of
flood risk studies, design and works, for example, to areas at greatest
risk of flooding).
Climate
adaptation
Reduce climate impact inequalities
including delivery of the actions
within the council's Air Quality
Action Plan.
Jan-24 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• Work to deliver the five year Air Quality Action Plan includes making
progress on the pledges outlined in the Plan (an example of which
includes an active travel strategy - getting people out of cars and
providing a network which will enable people to get about North
Lanarkshire and beyond by active means), investigating air quality
around schools, improving air travel options to community hubs, and
ensuring air quality has greater importance in the council’s
procurement and contract processes, in order to fulfil the council’s
statutory responsibilities in terms of local air quality management.
• Chapelhall and Coatbridge Air Quality Management Areas (AQMAs)
revoked with Committee, Scottish Government, and SEPA approval.
Croy air monitoring station decommissioned. New air monitoring site
at Gartcosh now operational. Input provided to support the
development of the Local Transport Strategy consultation which is
currently underway.
Climate
adaptation
Engage all stakeholders in climate
adaptation decision making and
delivery, with a focus on young
people. This will be driven through
the council's Climate Action Plan
which will be reviewed to reflect the
works being undertaken across this
Programme of Work and others.
Feb-20 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• Engagement with schools in climate change campaigns (specifically
Earth Hour) to increase awareness and involvement is undertaken
annually, with a competition set for the schools to provide pictures or
poems to a brief. Work is underway to develop the 2025 thematic
brief based on the sustainable future priority.
• Following a bid to the Fairtrade Foundation to retain its status as a
fairtrade zone, the council was successful and will continue to be a
fairtrade zone until 31st May 2027. The Fairtrade Steering Group
continue to meet regularly to monitor progress and plan activities. In
2024, a Fair Trade flag was put up at Civic Centre to celebrate Fair
Trade fortnight and to raise awareness of Fair Trade in North
Lanarkshire. Engagement also taken place with the Co-Op. Page 35 of 290

Page 36

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
• Financial support is ongoing via three business grant schemes, to new
and existing businesses, to help them trade in a more environmental
and sustainable way to aid their businesses growth and improve the
sustainability of their operations. This is due to complete in March
2025 and work is underway to look at new grant schemes for 2025/26.
Resilient People
Accessible and
inclusive family
support
Develop and deliver integrated
offer of early practical, emotional,
and financial support aligned to the
community hubs to ensure the right
support at the right time to
individuals and families.
Aug-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• Service has been commissioned and mobilisation is complete through
Whole Family Wellbeing Funding (WFWF) to procure universal early
help service aligned to new operating model. Newmains Hub began
as the pilot area for whole family support, and this was quickly
expanded to cover the Wishaw area before being expanded further
with the service now available across North Lanarkshire.
• To engage and work with local families, staff, and providers to
implement and embed the new commissioned early help service
within the new operating model and hub roll out - delivery has been
targeted from the hubs to consult communities around need, both
formally and informally through projects or drop-ins. Learning from the
pilot hub and local area is being used to influence delivery across
North Lanarkshire. Drop-ins are targeted for Fridays, specifically for
families, to raise any issues that may present prior to the weekend or
who may require weekend intervention.
• The current offer of family support across all council services is under
review to develop proposals for sustainable, flexible, and responsive
whole family support within the new operating model. Support has
been commissioned from the Improvement Service to provide external
facilitation around review activity and a subgroup is currently finalising
the methodology and scope to evaluate the service and supporting
data.
• While not yet due to start, initial feedback from the family support
provider is a need for cash first and therefore this has been
accelerated. This builds on the success of the direct payment
initiatives to enable the workforce to use a cash first approach as part
of the family support offer to prevent crisis and meet need. Learning
is being used to consider how this can be delivered.
• Work is underway to create economic opportunities for families by
developing employment pathways through the universal early help
service and a volunteer co-ordinator is being recruited. Joined up
working has been established within family learning in respect of
training, accreditation, and learning and to support the next steps in
terms of growing Volunteer North Lanarkshire pathways and focusing
Page 36 of 290

Page 37

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
on employability through existing pathways aligned to hubs.
Accessible and
inclusive family
support
Establish a no wrong door
approach to deliver early family
support using continuous
evaluation and co-production to
develop a sustainable and effective
model for the future built on the
principles of the Promise, GIRFEC
(Getting it Right for Every Child),
and GIRFE (Getting it Right for
Everyone).
Jan-24 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• To create local access to whole family support within the new
operating model as a core component of community and town hub roll
out programme, the early help service has been using the partnership
base within the hub and strong relationships with stakeholders are
developing.
• Model for Newmains and St Brigid's operationalised with Barnardo's
and four weekly hub delivery group meets on progress. One Service
leads group to accelerate the delivery of wider integrated services
through the hubs.
• Pathways developed and all partners involved in design and
implementation to ensure a no wrong door approach by embedding
developments in whole family support within the GIRFEC (Getting it
Right for Every Child) and GIRFE (Getting it Right for Everyone)
approaches in order that families receive the right support wherever
they ask for it. Operational group established to develop and test
referral and escalation pathways.
• Draft logic model and schematic developed to outline purpose and
aims of project to develop a communication plan in order that the
values, principles, and purpose of whole family support is understood
across workforce and communities. Stakeholders identified and
communication initiated. Sway developed for all staff. Individual
briefing sessions have taken place between Barnardos and health,
education, and other providers.
• The creation of an all-age carer working group - to explore and resolve
issues and challenges currently facing carers - is progressing as set
out in the strategy. The identification of gaps in the current carer
support offered by the council is ongoing and will be informed by the
work of the all-age carer group.
• The North Lanarkshire Carer Strategy has been updated for 2024-27
and approved by the Adult Care and Social Work Committee (link) and
is available in the public domain. This follows consultation with parent,
carers, and families to ensure a specific section relating to parent /
carers in the refreshed Local Carers Strategy.
Accessible and
inclusive family
support
Implement GIRFE (Getting it Right
for Everyone) approach in adult
services to improve pathways to
support.
Jan-24 Mar-26 Green At delivery and
ongoing
management
and monitoring
stage.
• Pathfinder work is progressing, and links have been established with
back to basics approach which aim to ensure a clear pathway for
people that supports empowerment and aligns with whole family
support.
• Implementation session and launch completed in respect of a sticky
person approach, which is to identify a lead person to assess and
engage others to ensure the right response where needed, thus Page 37 of 290

Page 38

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
reducing multiple referrals. Implementation plans drafted for each
locality and an enabling approach is operating across services.
• An update in respect of the wide range of work being delivered to
supporting children, young people, and families was endorsed at the
Education, Children, Families Committee in November 2024 (link).
This includes an update on a key strand of the Resilient People
Programme of Work which is to improve the outcomes for children and
their families through a long-term shift in resources to preventative
support that gets the right support to families at the right time.
• An update is also provided on actions to achieve these aims, including
how investment is being used through the Whole Family Being Fund
(WFWBF), Scottish Equity Fund (SEF) ,and the Community Mental
Health and Wellbeing Support and Services Framework grant
(CMHWBF) to innovate and realise the ambitions of Resilient People.
The report sets out these approaches at the levels of universal,
additional, and intensive supports in line with the staged intervention
model.
Accessible and
inclusive family
support
Introduce the Signs of Safety in
children's services as a
transformative approach to
strengthening families and
addressing risks of harm.
Dec-23 Oct-25 Green At delivery and
ongoing
management
and monitoring
stage.
• Signs of Safety cohort / working group established to take forward the
implementation plan, including oversight of a comprehensive training
programme for the council and partners. Training programme up and
running and has been updated for 2025; this includes bespoke
sessions for partners. A workplan is under development which
includes a further review and update of relevant policies and
procedures.
• Signs of Safety evaluation framework has been established in order to
measure impact and those who have undergone the training are now
using the framework in practice.
• Assessment and planning processes for lead professionals in social
work have been further refined to incorporate the values, principles,
and practice of Signs of Safety and embed the approach; this is also
aligned to the implementation of the Mosaic system.
Accessible and
inclusive family
support
Embed the Close to Home initiative
in both adult and children's
services to ensure that people
benefit from effective support,
connections, and opportunities with
their own communities.
Apr-20 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• Kinship and virtual school family support workers are in place and
offering family support within identified teams to enhance supports at
additional and intensive levels to support and sustain children in
kinship care and additional support needs at home.
• Recruitment completed for additional support needs (ASN) family
support workers who will be managed alongside Family Engagement
Support Assistants (FESAs) within community learning and
development. This role is being embedded across ASN schools to
offer integrated family support across seven days and a needs and
gap analysis is underway with a specific focus on ASN. Page 38 of 290

Page 39

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
• Work is ongoing to invest in family group decision making and lifelong
links to facilitate sustainable and creative solutions that enable
children and young people to be cared for in North Lanarkshire. 14
care experienced young people are being supported to re-establish
contact with significant people to provide lifelong support and 24
families are being supported to find solutions to keep children within
families and prevent care. Following a submission to achieve Family
Rights Group (FRG) accreditation, the service has achieved formal
accreditation to deliver Lifelong Links. The project is at the stage of
consolidating and building on prior successes with the additional
resourcing through the Whole Family Wellbeing Fund.
• Recent out of authority placements have been made as part of plans
to continue to embed and evaluate improvements in integrated
approaches to planning for children and adults with complex needs to
further reduce the need for placement outwith North Lanarkshire. A
representative from Education and Families has now been added to
the Carers Oversight Group.
Tackling poverty
and preventing
homelessness
Implement a comprehensive new
Tackling Poverty Strategy (2023-
26) as the vehicle to continue to
reduce child poverty, address
inequalities, and support active
citizenship and growth.
Apr-23 Mar-26 Green At delivery and
ongoing
management
and monitoring
stage.
• Recent highlights are approval of the Local Child Poverty Action
Report and the annual update of the Tackling Poverty Action Plan by
the Wellbeing and Tackling Poverty Committee in November 2024
(link).
• This includes an update in service provision across North Lanarkshire
in relation to income from employment, holistic supports, reducing the
cost of living, and income from benefits. Tackling poverty
and preventing
homelessness
Evaluate the impact of the 2023-26
Strategy and Action Plan and
develop a revised Tackling Poverty
Strategy for 2026-29.
Apr-23 Mar-26 Green At delivery and
ongoing
management
and monitoring
stage.
Tackling poverty
and preventing
homelessness
Embed anti-poverty approaches
within all service delivery with a
particular focus on universal
services, strengthening pathways
to support from health and
education and using Multiply and
MACA (money advice and
consumer advice) to empower
young people and individuals.
Apr-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• Rolling programme of poverty sessions delivered to 400 staff across
all council services to raise awareness. Work is underway to develop
an online module.
• Rolling programme of anti-poverty approaches developed and
embedded within all service delivery with a focus on universal
services, advice, information and representation, maximising
residents’ income, provision of money advice, and maintaining /
introducing new referral pathways to all services. This includes
referral pathways with external partners.
• In relation to financial education for children and young people the
council is working with a national programme to deliver financial
education across all cohorts and work is underway to analyse the Page 39 of 290

Page 40

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
results of this programme.
• The multiply project continues to provide financial education to
working age adults.
Tackling poverty
and preventing
homelessness
Review and redesign housing
support services for people
experiencing (or at risk of)
homelessness to ensure housing
support services align with the new
Prevention duties and provide
flexible, strength-based support to
help people successfully sustain
their accommodation and achieve
positive wider life outcomes.
Nov-23 Feb-25 Green At delivery and
ongoing
management
and monitoring
stage.
• Housing support service review complete. Report approved at
Housing Committee in November 2024 (link) for the re-tender of the
housing support contracts.
Tackling poverty
and preventing
homelessness
Implement a new crisis response
and assertive outreach service in
partnership with North
Lanarkshire's Alcohol and Drug
Partnership to provide immediate
assistance to people experiencing
homelessness or at risk of
homelessness in need of an urgent
response (outwith current service
provision) to prevent and reduce
recurring homelessness and
improve access to support and
services.
Feb-23 Jun-26 Blue Completed or
at closure
stage.
• Crisis response and assertive outreach service fully operational
(following developments in partnership with North Lanarkshire's
Alcohol and Drug Partnership and appointed service provider) to
provide support and assistance to people experiencing or at risk of
homelessness. Project complete - referrals and outcomes achieved
will be closely monitored over the duration of the contract.
Tackling poverty
and preventing
homelessness
Review the Temporary
Accommodation Strategy to identify
current and future temporary
accommodation requirements,
giving key consideration to the
implementation of the Rapid
Rehousing Transition Plan.
Nov-23 May-24 Blue Completed or
at closure
stage.
• Revised Temporary Accommodation Strategy developed for 2024-29-
and approved by the Housing Committee (link). This identifies current
and future temporary accommodation requirements and provides
recommendations for the future strategy, setting out a range of actions
over the next five year period.
Tackling poverty
and preventing
homelessness
To explore innovative ways to
extend the reach of the Scottish
Welfare Fund to assist people who
are homeless or at risk of
homelessness, recognising the
importance of furniture provisions
in aiding positive tenancy
Feb-23 Apr-24 Blue Completed or
at closure
stage.
• Complete. Fast track system implemented for community care grants
for homeless households in temporary accommodation to enable a
swifter move into permanent accommodation and to free up temporary
accommodation.
• Rapid Rehousing Plan funds confirmed, and short life working group
have reviewed procedures and processes to improve access to
furniture to support tenancy sustainment. Options explored include
Page 40 of 290

Page 41

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber) 
sustainment outcomes.     supplementing the Scottish Welfare Fund through the furniture fund.
Strengthening
community
capacity and
wellbeing
Develop the council's approach to
Community Wealth Building and
associated implementation plan to
strengthen community capacity and
wellbeing.
May-23 Jun-25 Green At delivery and
ongoing
management
and monitoring
stage.
• The draft Community Wealth Building Statement was endorsed by the
Enterprise and Fair Work Committee in November 2024 (link) and the
North Lanarkshire Partnership Strategic Leadership Board - this aims
to develop shared partnership understanding and partnership
approach to progressing community wealth building. Engagement is
planned with services, and stakeholders, before the end of 2024/25 to
identify priority areas for the implementation plan, including a reporting
schedule and monitoring arrangements.
Strengthening
community
capacity and
wellbeing
Embed equalities approaches and
actions across all work with
communities to maximise the
influence, participation, and voice
of all North Lanarkshire's citizens in
the development of communities
and services.
Mar-23 Mar-25 Green At delivery and
ongoing
management
and monitoring
stage.
• The council has signed up to the North Lanarkshire Partnership
CommUnity Agreement developed by VANL to strengthen
partnerships and approaches to working with the community and
voluntary sectors. Discussions have taken place regarding the
implementation of the Agreement and in terms of measuring the
agreement across partner agencies. A review of the council’s
Framework for Working with Communities is underway and this will be
aligned with the principles of the CommUnity Agreement.
• Work to review engagement resources / guides available to enable
and build capacity across key staff expected to support meaningful
and honest dialogue with communities is being further considered
along with the review of the Framerwork for Working with
Communities.
• To ensure action at a local level strengthens representation of
equalities groups in local engagement and delivery of Local Outcome
Improvement Plan (LOIP) priorities (linked to the council's equalities
duties) work has included a targeted approach with Deaf and BAME
communities linked to their participation and barriers faced around
community safety and local service provision. Consultation is
underway on the councils statutory equalities outcomes with one
outcome focusing specifically on engagement and participation.
Strengthening
community
capacity and
wellbeing
Strengthen engagement,
participation, and empowerment
across communities to develop an
integrated service offer that meets
the needs of communities.
Oct-22 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• To progress key actions - to strengthen the role of the community and
voluntary sector in the delivery of services and activities associated
with LOIP priorities - engagement has taken place with community
and voluntary sector organisation regarding delivery of LOIPs.
Community Board Conference planned for April 2025 in conjunction
with Community Board chairs.
• To identify opportunities to build and resource community resilience,
50 groups now hold resilience packs, and all groups have been issued
with two way radios and other equipment for community use.
• Work continues to engage with more groups and encourage take up of
Page 41 of 290

Page 42

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
the resilience pack model to understand local priorities and ensure
challenges are considered going forward
• To strengthen connections between locality community planning and
health and social care groups - to ensure a focus on delivery of the
LOIPs - discussions are underway to better align local partnership
delivery mechanisms and draft next steps proposals for consideration
at strategic level across organisations.
• To enhance engagement with communities across the nine
Community Board areas to empower them and help to build their
capacity in further support of improving the local approach to
community ownership and management of assets, two officers have
been recruited to focus on working with local community and voluntary
sector to build capacity and raise awareness of the new policy and
process.
Trauma informed
organisation and
service delivery
Develop a comprehensive local
Trauma Plan to ensure that trauma
informed practice and systems are
embedded within the council's
operating model.
Nov-23 Jun-24 Blue Completed or
at closure
stage.
• Project plan developed and approved by committee to create the
framework for North Lanarkshire becoming a trauma-informed
organisation. Steering group established with representation from
across council to oversee the project and develop and implement the
trauma plan across the council. Communications plan agreed and
trauma principles introduced to the council’s Operational Management
Team.
Trauma informed
organisation and
service delivery
Implement the Trauma Plan with a
focus on creating the culture and
conditions across the council to
enable staff to respond in ways
which recognise the impacts of
trauma, promote recovery, prevent
re-traumatisation, and ensure
services and effective supports are
accessible to / effective for those
who need them most.
Apr-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• To strengthen staff care, support, and wellbeing through the
integration of trauma-informed principles within the council's Mental
Health and Wellbeing Strategy, wellbeing plans incorporating the
trauma principles are in development to identify specific needs and
supports according to service. In education, for example, this involves
trauma walkthroughs to understand experiences and needs.
• To ensure children, families, and communities are involved in the
design of trauma informed services, a Parent / Carer advisory board is
in place with work ongoing with young residents to support the
implementation of the UNCRC along with wider family support
requirements. A youth conference in November 2024 allowed the
voice of young people to influence future serve design and the families
here and now service are undertaking community consultation using
arts to identify local need in each hub area. This will be used in the
ongoing design and delivery of services in each area. Current
engagement across education and families, adult health and social
care, and procurement is specifically focusing on work to streamline
the procurement of services that include lived experience.
• A trauma design framework has been drafted to embed trauma
principles in the design and environment of schools, town centres, Page 42 of 290

Page 43

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
community hubs, and service delivery locations, with the Buchanan
Centre being used as the case study. Following final development
work and engagement with various services across the council, as
well as external organisations, the framework is scheduled to be
launched before the end of 2024/25. This will include ways to
measure the impact of trauma-informed principles for staff and people
who use services.
• To promote the awareness, confidence, and skills of staff to use the
principles of trauma informed practice, a training plan has been
created for rollout that includes use of a training needs analysis tools
and identification of trainers with service specific knowledge to allow
for materials to be adapted accordingly.
• To equip managers with the knowledge of principles trauma informed
leadership - in order to support the workforce to respond sensitively
and effectively to individuals using council services who are affected
by trauma - over 3,000 officers across the council have now
undertaken the Trauma Informed Level 1 training with the principles
integrated into teacher leadership programmes and over 200 staff
have completed the Trauma in Mind course with evaluations noting
increased knowledge and skills.
Investing in
prevention
Identify capacity to increase
proportionate spend of prevention
to support improved outcomes for
children and their families and
development of a sustainable
service model for the future.
Nov-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• Engagement continues with the national Promise team to develop
method to analyse Human and Economic Cost (HECM) of family
support. Asset map of family support created in partnership with
Promise and interim findings have been produced by way of a
composite story and proposals for next steps.
• Baseline costed analysis have been created of individual journeys
through support and services using HECM analysis of families
accessing support within current service model.
• The family support steering group has agreed a broad plan for the
progression of work with the national Promise team to understand
services and the experience of families and further engagement is
planned for February 2025 to finalise proposals and move to the next
steps.
• To identify and cost current spend of family support functions across
the council (including risks linked to temporarily funded services)
council officers have completed a high-level financial review of service
areas within the Programme of Work. In doing so, and in line with this
specific activity action, indicative financial assumptions regarding
direct family support, indirect family support, non-transferable (i.e.
statutory / ring-fenced) family support, and non-family support have
been broadly identified. The output of this activity provides a
Page 43 of 290

Page 44

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
contextual financial baseline of council resources which support areas
of service delivery within the wider thematic category of family support
and therefore this aspect of the action is now complete.
• To apply HECM in analysing the impact of the new operating model
(and compare outcomes and costs of the traditional service approach
and the potential within the new operating model to support
sustainable service design) work is underway to engage with staff and
families using a three pronged approach to gather information about
cost, experience, and process / system - a session is planned for
February 2025 (with the national Promise team) to progress this.
Investing in
prevention
Map and enhance existing cash
first and direct payments initiatives
through establishment of a
supporting framework aligned with
family support principles to reduce
stigma and empower families and
frontline workforce to tailor
solutions to need.
Dec-23 Nov-25 Green At delivery and
ongoing
management
and monitoring
stage.
• Work continues to provide a cash first approach to food crisis and
overcome the barrier identified through the food poverty referral
gateway. As at December 2024, the council has issued £24,328 cash
first payments since December 2023 through 735 individual payments.
• From December 2023 to September 2024, 951 residents received a
cash first payment (£18,777 for food crisis and £11,418 for fuel crisis).
• In 2023/24, the council generated £1.2million in additional benefit
income for residents experiencing food and fuel crisis.
• A directory has been drafted to map all existing cash emergency
payments provided by all council services to better support integrated
service provision and the direct payment initiatives. This will be
finalised and rolled out in 2025.
• Work is underway to establish a framework via piloting the (food crisis)
cash first payment to support the direct payment initiatives to reduce
stigma and empower families and frontline workforce to tailor solutions
to need.
Brighter Futures
NL academies Ensure increased skilled workforce
employed in roles which fit industry
needs and contribute to greater
economic outputs.
Apr-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• Completed projects include:
- Low carbon learning and Next Gen summit - 274 attended the one
day programme.
- Tigers Future in Construction - 14 participants supported to gain a
qualification, 13 of the 14 participants gained their card to gain a
vocational licence, 15 participants supported to engage in life
skills, and 11 of the 14 participants (either school pupils or
unemployed prior to programme as per their registration form)
were supported into employment, including self-employment.
- Digital academy - 24 participants were supported to gain a
qualification and supported to engage in life skills throughout the
programme.
- SPEN and Overhead Line Inspectors - 14 candidates are now in Page 44 of 290

Page 45

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
jobs.
- HNC Construction Management - 15 students are currently
undertaking this qualification.
• Portfolio of projects for 2025/26 drafted and funding levels agreed by
UK Shared Prosperity Fund (UKSPF) Board - mobilisation will
commence January to March 2025 for projects commencing from April
2025 onwards.
• Progress towards developing university strategic partnerships and
linking these to industry needs in order to provide pathways towards
employment is being undertaken through the Built Environment
Academy and Care Academy. University and college partners attend
the Care Academy steering group to link into ongoing workstreams
and priorities.
• A review of future activities under this deliverable is underway to
ascertain the next steps to 2028.
NL academies Develop employer engagement
within each model to ensure full
participation and increased work
opportunities.
Apr-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• To implement this deliverable, a funding model is being developed to
sustain the NL Academy model in working with industry and relevant
partners. Progress continues in establishing a Built Environment
Academy workstream as part of the Built Environment Sector Board
which includes identification of a way of sustaining the Academy
model, and development of a business case.
• Industry led sector boards within each NL Academy area (Built
Environment, Health and Social Care, and Digital) are in varying
stages of development - workstreams have been agreed in relation to
the Built Environment group, a group has been set up in respect of the
Care Academy, with the Digital Academy Board still to be established.
NL academies Enhance attraction and advance
equalities across key industry
sectors.
Apr-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• Approval granted for the Modern Apprenticeship rate of pay aligned to
Fair Work First principles which enables further discussions around
collaborative apprenticeships with NHS Lanarkshire.
• Attraction, recruitment, and retention workstreams have been
established under the industry led sector board implemented in Built
Environment and Care and are currently being progressed in respect
of Digital.
Page 45 of 290

Page 46

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)
NL academies Maximise opportunities to enhance
social value through the council's
procurement activity. 
Change: Following a review at the
Brighter Futures Board in
November 2024, the Board agreed
to establish this new deliverable to
widen the scope of securing social
value across the council. This new
deliverable encompasses two other
deliverables previously under the
funding and social value theme (i.e.
to identify different timescales for
funding and any potential gaps and
future opportunities and to identify
community benefits opportunities
linked to each theme).
Nov-24 Mar-28 Green At planning and
set up stage.
• To create and implement a Social Value Framework - to ensure
current and new contract arrangements are maximised, integrated,
and align to The Plan for North Lanarkshire and the supporting
Programme of Work - activities are underway to draft a menu of
community benefits.
• A review of current contracts has also commenced in conjunction with
procurement to inform the analysis in terms of the extent to which
social value is currently maximised.
Funding and
social value
Identify all relevant funding streams
and how they fit together.
Sep-23 Oct-23 Blue Completed or
at closure
stage.
• Desktop exercise complete in respect of identifying all funding streams
to identify how they align and integrate.
Brighter futures
curriculum and
pathways
Expand pathways and progression
routes within key industry sectors
to connect to employment.
Jan-23 Jun-24 Blue Completed or
at closure
stage.
• Complete. Plan established (via the vocational education multi agency
steering group) to refresh and relaunch the enterprise curriculum,
pathways, and certification in order to progress and facilitate growth
and expansion of Foundation Apprenticeships, Higher National
Certificates, and vocational education in growth job sectors.
• 69 young people completed an HNC in S6. 171 young people
completed a Foundation Apprenticeship in key industry sectors.
• There is also greater reference to labour market intelligence when
secondary schools are designing curriculum rationale. As delivery
relies on external partners, a quality assurance cycle has been
introduced to monitor this.
Brighter futures
curriculum and
pathways
Grow full range of school
vocational pathways for core
sectors, including STEM (science,
technology, engineering, and
mathematics), digital skills,
construction, and health and social
care.
Jan-23 Jun-24 Blue Completed or
at closure
stage.
• Complete. For academic session 2023-24, all courses are completed
in terms of other vocational pathways to increase wider achievement
opportunities which target young people, increase additional
opportunities available through Future Fridays, and build upon the
existing progression pathways available for literacy, numeracy, digital
literacy, and computing. As delivery relies on external partners, a
quality assurance cycle has been introduced to monitor this.
Brighter futures Advance equalities within Jan-23 Jun-24 Blue Completed or • Complete. Work to advance equalities within curriculum pathways has
Page 46 of 290

Page 47

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)
curriculum and
pathways
curriculum pathways 3-18 years.    at closure
stage.
included the recruitment of job coaches for young people with
additional support needs to prepare them for life beyond school and
for the world of work, developing the National Certificate curriculum
rationale to include equalities and providing training for all heads of
establishment, and establishing an advancing equalities forum led by
the council’s education and employability services.
• Group membership has been agreed and terms of reference created.
Attendance at follow up meetings low.
• Curriculum rationale session offered on ensuring equality within the
curriculum to all heads of establishment.
Brighter futures
curriculum and
pathways
Map, develop, and implement play-
based approaches in early years to
develop a full play-based learning
offer.
Jan-23 Jun-24 Blue Completed or
at closure
stage.
• Complete. Play based approaches have been mapped across primary
and are intrinsic to early years delivery.
• In collaboration with early learning and childcare, through 1140 hours
funding, two education support officers have been appointed to take
forward developments in play and enquiry and develop approaches to
play across early level in first and second level during a 23 month
secondment. An initial test of change will be conducted with a small,
targeted, focus group of schools.
Employability and
community
learning and
development
Address the current challenges of
North Lanarkshire’s labour market
including the rise in economic
inactivity alongside unemployment
Apr-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• Updates from local employability partners on local labour market -
including comparisons with pre covid labour market - are now
completed.
• New activity reflects the rise in economic inactivity in the labour
market and the actions of employability services to engage and
support these residents alongside unemployed residents.
• New programmes are being designed for 2025/26 that also address
economic inactivity; these will be launched in April 2025.
Employability and
community
learning and
development
Ensure continued expansion of
supported employment
programmes, increase
opportunities for North Lanarkshire
Industries to diversify and integrate
these with wider employability
support.
Oct-23 Mar-26 Green At delivery and
ongoing
management
and monitoring
stage.
• Development of an Action Plan for North Lanarkshire Industries for
2024-26 is underway with a view to assessing progress at six months.
• North Lanarkshire Industries has secured contracts in respect of the
future council Hubs and with the State Hospital.
• As part of the development of North Lanarkshire Industries, training
places will be created to provide support for individuals who are
disabled.
Employability and
community
learning and
development
Develop and embed the Employer
Charter within a broader range of
businesses.
Apr-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• Delivery of the charter continues with assessments of companies
applying for charter status or increased status and support to new
businesses to join the charter or upgrade their accreditation. Event is
scheduled with the justice service.
• Review underway in terms of the delivery of the charter and
networking events for employers to evaluate their success and identify
next steps to 2028.
Page 47 of 290

Page 48

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)
Employability and
community
learning and
development
Ensure integration of external
employability funding with council
led programmes via Local
Employability Partnership.
Jan-23 Mar-25 Green At delivery and
ongoing
management
and monitoring
stage.
• Both UKSPF programmes are entering their final phase with 529
unemployed or economically inactive residents entering employment
from April to December 2024.
• In the final quarter of the programme, the focus will be on engaging
high numbers of residents to capitalise on the usual uptick in referrals
post-Christmas and support as many as possible into work before
these programmes close in March 2025.
Employability and
community
learning and
development
Create and implement a
development plan focused on
delivering numeracy programmes
to adults aged 16+ to meet
objectives of Multiply/UK Prosperity
fund.
Jan-23 Mar-25 Green At delivery and
ongoing
management
and monitoring
stage.
• During the previous quarter, a further 10 learners have completed First
Aid qualifications and 24 the Royal Environmental Health Institute of
Scotland (REHIS) food hygiene course.
• 141 SQA certificates in numeracy have been achieved so far in
2024/25. In November 2024, a new National 4 Maths programme was
launched which now has 15 candidates taking part. National 5 work is
continuing in partnership with New College Lanarkshire.
• In 2025 a final cohort of staff will be completing the SQA Conduct the
Assessment Process training to allow them to deliver SQA
qualifications. The current cohort of staff participating in the SQA
Internal Verification course are due to complete this before the end of
2024/25. Frontline delivery will continue around adult numeracy, with
over 500 Sum It Up learners anticipated by the end of 2024/25.
Employability and
community
learning and
development
Create a community based
employment opportunity within the
council for up to 18 young people
aged 19-24 years who experience
multiple barriers to learning and
employment.
Apr-24 Mar-25 Green At delivery and
ongoing
management
and monitoring
stage.
• To support an increased skilled workforce, four staff have secured
positive destinations (including university and employment). Nine staff
have achieved ICT qualifications. A further three young adults have
completed Walk Leader training (in addition to previous four) and 11
have passed First Steps to Youth Work (SCQF level 4). Two Young
Adult Project staff gained temporary higher duty community learning
and development support worker positions.
• All staff from the Young Adult Project are completing their Adult
Achievement Award (including residential work) end of year evaluation
and personal profiles, which has a strong focus on job search,
applications, and interview skills. A celebration event is being planned
to showcase the past year including the opportunity to share their
learning and employability journey.
Employability and
community
learning and
development
Develop and deliver employability
pathway for Resettled Scots
including Unaccompanied Asylum
Seeking Children (UASC) building
in accreditation through Scottish
Qualification Authority (SQA)
qualifications.
Feb-24 Mar-26 Green At delivery and
ongoing
management
and monitoring
stage.
• As part of the overall project to develop an English for Speakers of
Other Languages (ESOL) pathway for employability programmes and
implement a ESOL employability course in partnership with Routes to
Work and New College Lanarkshire, 453 distinct learners have
engaged in the Resettlement and UASC learning programmes. 2
ESOL employability classes were offered to beginner level ESOL
learners from September 2024. This follows the success of 6 ESOL
Page 48 of 290

Page 49

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
employability courses to intermediate level learners. 4 small business
workshops have been delivered to 52 participants in partnership with
Business Gateway to new Scots. The workshop provided new Scots
with funding, guidance, and support to turn their ideas into reality.
• 4 Unaccompanied Asylum Seeking Children (UASC) young people
attended the outward-bound week-long residential trip to build
language skills and confidence. As a result of these and other
interventions, 154 individuals engaging in Resettlement and UASC
learning programmes have now progressed to positive destinations.
• Following the success of the wider community employability
programme, community learning and development are working with
UASCs on a one to one basis to build their confidence and support
them to write their CV. Community learning and development is also
working with partners to identify potential work experience
opportunities.
• Future developments will include expanding ESOL opportunities for
beginner level learners in particular, and continuing to work across the
council on the Workforce for the Future programme.
Employability and
community
learning and
development
Develop and implement a
comprehensive learning
programme where 50% of learners
who achieve a core skills
qualification will reside in the top
Scottish Index of Multiple
Deprivation (SIMD) 1 and 2 data
zones.
Mar-24 Mar-25 Green At delivery and
ongoing
management
and monitoring
stage.
• By the end of Q2, 46% of learners achieving core skills lived in SIMD
1 and 2 data zones. The number of distinct learners gaining core skills
across all five core skills areas were: IT 89, Communication 27,
Numeracy 208, Working with Others 15, and Problem Solving 11.
• A total of 920 youth accredited learning awards were achieved by 772
distinct young people by the end of Q2.
• In relation to staff development, a further 5 staff have completed Adult
Achievement Award training to support the future delivery of this
award.
• An Adult Achievement Award celebration event involving over 20 adult
learners is planned for February 2025. Staff and volunteers will
complete the current PDA in Adult Learning (Level 6) course by March
2025 to develop delivery skills and support quality adult learning.
Volunteering Establish volunteer baseline,
covering current activity, training
received, and availability for
broader opportunities.
May-23 Mar-25 Green At delivery and
ongoing
management
and monitoring
stage.
• Continued engagement across the council and with local voluntary
groups including Voluntary Action North Lanarkshire. Second
challenge fund finalised to continue to offer support / mentoring to a
range of local groups.
• Work is underway to increase engagement with Community Boards to
explore options for volunteer projects and to continue to work with
services on links to community benefit options. This includes ongoing
discussions with Hochtief.
Volunteering Map community partnerships who May-23 Mar-24 Blue Completed or • Complete. Volunteer role profiles developed and details gathered on
Page 49 of 290

Page 50

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber) 
offer volunteering opportunities and
the current offer (baseline).   
at closure
stage.
opportunities and forthcoming projects / events for signposting to
interested volunteers.
Volunteering Implement and maintain a system
capable of capturing volunteers,
skills, training, and opportunities
available.
Oct-23 Mar-25 Green At delivery and
ongoing
management
and monitoring
stage.
• Volunteer management system secured (Rosterfy) and development
almost complete.
• Work continues to support accreditation options, particularly Satire
Award, with young volunteers and is ongoing with New College
Lanarkshire to explore qualification options for volunteers.
• Initial work is underway to establish Volunteer NL as SQA centre to
deliver volunteer qualifications at 3,4, and 5 to continue to support
existing volunteers with qualifications underway. 14 volunteers
undertaking the Invest in Volunteering Open University programme.
Volunteering Implement and maintain a front-
end website (one stop shop) for
volunteering in North Lanarkshire.
Oct-23 Mar-24 Blue Completed or
at closure
stage.
• Complete. QR codes for the Roserfy volunteer management system
developed to improve accessibility from a range of council venues and
service delivery points.
Entrepreneurship Map current entrepreneurship and
self-employment provision across
North Lanarkshire.
Apr-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• Mapping of all existing entrepreneurship support and activity taking
place across North Lanarkshire - provision, geography, and target
groups.
• Review underway of start-up funding and new scheme being
developed. Report in terms of the outcome of a review of business
support scheduled to go to committee in cycle 1. The business
gateway service have implemented a new Business Support
Bootcamp and discussion is underway with Routes to Work to develop
routeways to self-employment as a joint project for clients.
• A guide is in development for a new start-up grant scheme which will
include an online application form.
Entrepreneurship Develop entrepreneurship activities
to drive activity where gaps and
provision from the mapping
exercise have been identified.
May-23 Mar-25 Green At delivery and
ongoing
management
and monitoring
stage.
• Review of operating model for business gateway underway.
• Performance to date for North Lanarkshire April to December 2024:
- Start-ups - enquiries 798, new starts 217, high growth starts 36.
- Existing businesses - 341 enquiries, 229 business engagements, 21
local priority supports, and 27 growth businesses.
- Workshops - 500 attendees from North Lanarkshire (local and
national), 90 expert helps delivered, 41 specialist surgeries delivered
with experts.
- Satisfaction - as at September 2024: 86% satisfaction overall, 86%
expectations met/exceeded, 89% beneficial to business, 89% likely to
recommend, 89% likely to keep using, 91% satisfaction with staff.
Target across measures is 80%.
Entrepreneurship Advance equalities and deliver
targeted entrepreneurial support to
under-represented groups through
Oct-23 Mar-28 Green At delivery and
ongoing
management
• In terms of delivering tailored business start-up and support
programme to Black, Asian, and other Minority Ethnic people and
groups a change is now being delivered by Scottish Asian Business Page 50 of 290

Page 51

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber) 
bespoke interventions.    and monitoring
stage.
Chamber with 250+ businesses engaged, 75+ new start businesses,
and 30+ businesses referred to Business Gateway.
• 70+ businesses attended a session at New College Lanarkshire to
hear about The Plan for North Lanarkshire and the work of New
College Lanarkshire. Referrals are being followed up by business
gateway team and 10 businesses have signed up for new degree
course at New College Lanarkshire.
• Dedicated co-working space established for women in Airdrie and a
pilot is underway to establish dedicated co-working space for women
in Airdrie (through UKSPF funding) and explore a sustainable
business model. Key Achievements to date for project:
- 360 women have registered on the HIVEs online platform.
1,239 x 4 hrs of workspace bookings have been made (4,956
hours) during 11 months in 2024.
37 female focused business events have been delivered with 272
female event attendees.
31 referrals have been received into business gateway.
- 11 women have accessed 121 mentoring and coaching services in
the latter half of 2024.
49 women were supported to be potential entrepreneurs through
the HIVE.
- 23 female led start-up businesses have been supported to start so
far through the HIVE.
- 50 pupils from S4-S6 schools in North Lanarkshire have visited the
Hive for a Day to Bee the Boss.
• Contract deliverables are underway to deliver a social enterprise
support tender (through UKSPF funding) to support creation of 30 new
social enterprises.3 accelerator programmes have been completed
since the outset, with 4 sector events delivered and one to one
support being delivered to clients. A key challenge has been
identifying start-ups, 6 start-up events were organised in localities
across North Lanarkshire - take-up was especially low and actions are
being identified to increase numbers. A crowd-funding event in
January 2025 was well attended. Action plan under development,
along with South Lanarkshire, for a joint Lanarkshire Social Enterprise
Network.
• Opportunities continue to be explored for alternative inclusive
ownership models in North Lanarkshire (linked to community wealth
building) with discussions ongoing with Business Gateway, Enterprise
Development, and Co-operative Development Scotland to develop the
programme to be implemented.
Page 51 of 290

Page 52

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
• In respect of raising awareness of community wealth building, staff
training and continuing professional development has been
undertaken and business models are now embedded in business
start-up workshops. Discussions with Health and Social Care and Co-
operative Development Scotland have taken place on a localised
programme to support people into care or other supporting roles to
establish micro-businesses and collaborative business models
Entrepreneurship Expand experiential
entrepreneurial activities and
pathway programmes within
education curriculum.
Aug-23 Aug-24 Green At delivery and
ongoing
management
and monitoring
stage.
• Work continues to deliver enterprise pathway and enterprising
schools award model within education, this has included:
- Delivering Enterprising Schools Week where 54 schools were
awarded an NLC Enterprising Schools Award that led to all
receiving a Scotland Enterprising Schools Bronze Award.
- One of the highlights was Dragons' Lair final for S3s which took
place at Biocity in September 2024. In total 23 teams across North
Lanarkshire’s secondary schools participated in the 2024 Dragons'
Lair. 6 teams were selected to present to a panel of business
experts (UKSE, BDD Pharma, Livn Manufacturing, and Indeglas)
at the final. The winner was from Cardinal Newman High.
- 10 schools have participated in 17 financial education workshops
with 354 pupils attending.
- 80 staff took place in numeracy workshops, the Youth Philanthropy
Initiative continues across schools and the Kings Trust is seeing
increasing numbers through ongoing engagement.
- At Cumbernauld Academy, S4 pupils won the Kings Award for
Scotland for their App and are receiving support from a Business
Gateway expert help provider to develop marketing for their App to
support refugees and asylum seekers.
Digital North Lanarkshire
Digital culture,
leadership, and
knowledge
Create a mature and sustainable
culture across the organisation to
ensure that digitisation of council
services provided to the public
successfully transition them to
achieve the outcomes specified
within The Plan for North
Lanarkshire.
Sep-23 Dec-25 Green At delivery and
ongoing
management
and monitoring
stage.
• An overview of progress to date from the Digital Culture, Leadership
and Knowledge theme was reported to Finance and Resources
Committee in November 2024 (link). This focussed on the digital
adoption work and the digital maturity assessment survey.
• Following on from the digital skills survey in 2021, the results of the
2023/24 survey examined digital adoption across services,
(particularly the use of M365) and at various levels. This showed that:
- 70% understood the value of the digital workplace
- 41% found their work more interesting as a result of applying
digital tools
- 73% actively supported change
- 73% have participated in learning Page 52 of 290

Page 53

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
- 52% didn't feel they have opportunities to decide what tools to use
for their jobs
- 47% agreed with having opportunities to develop new skills and
show capability
- 76% agreed they found digital workplace tool useful in their jobs
- 28% stated using the tools help them feel more valuable in their
job; 55% agreed that IT does support personal development
• Greater insight was also gained into the current thinking of
employees across services in relation to digital maturity where, from
an overall 16.1% response rate, 82% of respondents were positive
about the council’s readiness for change / digital adoption and
recognised the alignment of change and transformation with the
priorities set out in The Plan for North Lanarkshire. There was also a
recognition that the tools available have enhanced team collaboration
as well as enhancing individual efficiency and productivity. Accessing
support for the adoption of new technologies, particularly those
under-25, has been highlighted an area to be further investigated, as
well as further support that could be given to employees as part of the
digital culture change activities.
• Having established a baseline measurement for digital adoption a
digital maturity assessment is under development to further help the
council to understand the current state of technology use and extent
of digital maturity, and to identify gaps in digital capabilities.
• Workshops have been held over the winter to develop the next steps
and agree a development plan, this includes a focus on engagement
and communication, digital champions / leaders, training and support,
competencies, and etiquette (for which a NL Announcement was
cascaded in January 2025 implementing a Microsoft Teams Calls
Etiquette to be adopted across the organisation).
Digital culture,
leadership, and
knowledge
Develop digital leaders to facilitate
behavioural change required to
enable service transformation
within existing resources.
Nov-23 Sept-25 Amber At planning
and set up
stage.
• Initial discussions have taken place on the specific programme
currently in existence and aligning this to the needs of a council wide
leadership programme to incorporate digital capabilities, including
cognitive transformation (thinking differently), behavioural
transformation (acting differently), and emotional transformation
(reacting differently).
• Research work continues to understand the future state requirements
for the organisation with digital leadership core competencies and
approaches. However, due to competing demands, the end date has
been moved to September 2025 to enable a more in-depth and co-
ordinated approach; a subsequent risk review considered there was
Page 53 of 290

Page 54

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
no significant impact on the overall work plan in this respect.
Rescheduling of this work was addressed at the aforementioned
workshops to create the development plan for digital culture,
leadership, and knowledge.
Digital culture,
leadership, and
knowledge
Develop and deploy a self-
adapting redesign framework to
accelerate digital business
transformation of critical council
functions.
Sep-23 Mar-24 Green At delivery and
ongoing
management
and monitoring
stage.
• Upon completion, the change management toolkit portal was
demonstrated at the Programme of Work Board in December 2024
prior to a formal training programme and launch for a council wide roll
out by the end of 2024/25.
Digital culture,
leadership, and
knowledge
Support development of a skilled
workforce to foster consistent
knowledge, improve digital
adoption, and accelerate digital-
first business capabilities.
Mar-24 Apr-26 Amber At planning
and set up
stage.
• Work has commenced on identifying the appropriate format for a self-
assessment tool to allow staff to understand their current level of
digital skills and undertake further learning, as appropriate. This aims
to upskill the council's workforce to be more digitally capable.
• Modules on LearnNL are available to all staff and investment
continues in the flexible workforce development fund in digital skills.
• The existing education programme has been shared and an
assessment of a test of change is now under consideration.
• Other areas of activity at the initial stages include identifying
leadership capabilities and conclusion of the self-assessment. Both
of these items have been discussed in line with the development plan
noted above.
Improved
customer
experience
Ensure a connected / integrated
digital experience to facilitate
users to transition to efficient
digital and hub-based services and
become empowered to be self-
managing and digitally active.
Apr-23 Dec-25 Green At delivery and
ongoing
management
and monitoring
stage.
• Chat bot functionality went live on the council’s website in October
2024 to enable residents to receive automated responses or to chat
to an advisor.
• Processes / services available for public interaction on the council
website now expanded to include MOT / taxi compliance, roads and
streetlighting reports and requests, waste service requests, traffic
signal reports, and the ability to apply and pay for permits and
business grant applications online.
• Redevelopments of the customer relationship management (CRM)
system are underway to enhance processes for staff to route
enquiries to the relevant service and improve cross service working
and thereby a one council approach. Priorities are being reprofiled to
ensure all outstanding development work is completed and the CRM
Development Board and its supporting action plan have been
refocussed to support delivery, monitoring, and governance of the
priority actions identified.
• The council’s purchase to pay system - as reported to the Finance
and Resources Committee in September 2024 (link) - has been
Page 54 of 290

Page 55

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
redesigned to introduce a standardised approach that ensures a
consistent way of working across the council, maximises system
integration opportunities, removes / reduces paper based processes,
implements electronic invoicing and three way matching, and
improves management information. Purchase to Pay refers to the
end to end process in which goods and services are purchased and
ultimately paid for; this includes all steps from identifying the need for
goods and services through to paying a supplier. Final developments
are underway in respect of training and awareness sessions,
completing all communications with Pecos users, concluding all
configurations within Pecos, and developing plans for a soft launch by
the end of 2024/25.
Improved
customer
experience
Implement smart community hubs
to improve access to omni-
channel, digitally enabled services,
and experiences.
Sep-23 Mar-26 Green At delivery and
ongoing
management
and monitoring
stage.
• Public consultation on the resources and services required in the
digital zone is now complete and data is being reviewed to establish
requirements within digital zones for individuals with additional needs
and to integrate these into the digital zone offer.
• Next phase of the corporate booking system about to start with a
digital zones working group leading on integrating the corporate
booking system into the digital zone development.
• Report submitted to Communities Committee in October 2024 (link)
provided an update on immersive room developments and the
impacts. Work to expand community use of immersive experience
pods and enhance digital experiences within a community and
beyond has now seen the fourth immersive room, based in Airdrie
library, completed and operational.
• Six monthly reports to the Communities Committee - in August 2024
(link) and February 2025 (link) - provided regular updates to support
wider public and stakeholder engagement. This includes information
in respect of progress of the Driving Digital Locally working group, the
intergenerational projects which bring together elderly residents and
local primary schools, engagement for the digital zones, the public wi-
fi project, online chatbot tool, and status of the new booking system
implementation.
Improved
customer
experience
Ensure an accessible and single
source approach to data that
supports the organisation by
providing insights and evidence
that support decision making,
planning, delivery, and continuous
improvement as well as public
Oct-24 Dec-25 Green At planning
and set up
stage.
• This deliverable previously comprised four activities which were
reconfigured into one to ensure a more streamlined, focussed,
integrated, and value adding approach to data across the
organisation. To date development work has scoped out the purpose
and content of the strategy and identified the relevant existing
component parts which require to be incorporated as well as any
gaps which require to be filled. By developing a single Data Strategy
Page 55 of 290

Page 56

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber) 
reporting and transparency.     with a single approach to data, this aims to set the foundations in
respect the council’s data practices in order to unlock the potential of
data and create meaningful insights that support the council in
managing services and demand and delivering the Programme of
Work in line with The Plan for North Lanarkshire. This incorporates
all related aspects of data, including governance, quality, data
maturity, spatial mapping, open data, and the supporting architecture
and technology.
Digital first
operations
Ensure useful, secure, compliant,
and digital first applications are
available to support critical but
streamlined service delivery.
Jan-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• In September 2024, Policy and Strategy Committee considered the
new Automation and Generative Artificial Intelligence (GenAI)
Framework (link). This sets out the council’s AI vision for deploying
the technology in an efficient and effective manner in order to support
implementation of the AI vision through new digital service delivery
models and solutions designed to meet the needs of modern
businesses and communities. Next steps developments are
underway to develop a plan to identify opportunities for AI functions
and deliver the framework.
• Contract award for a new housing and asset management system - to
improve data management, monitoring, and service delivery across
housing - approved at the Housing Committee in November 2024
(link). Next steps developments and finalisation of the
implementation plan is now underway.
• New case management and scheduling systems - to meet statutory
obligations and to improve service delivery and performance
management across social care - is progressing with staff training
now complete and plans in the final stages to implement the first
phase of Mosaic before the end of 2024/25.
• Implementation of a leisure and facilities booking systems, including
integration with hub place bookings and introduction of compliant and
secure payment facilities that accommodate home and agile working
arrangements, are progressing with a contract in place and initial
supplier meetings held. Services have been migrated to latest
version of cloud system with rollout of new pay terminals and
installation of gated entry systems across a number of sites is
underway.
• A report in respect of the asset management practices across the
organisation was submitted to the Finance and Resources Committee
in September 2024 (link). This updated on progress in respect of
consolidating as many assets on to a single solution as possible and
reducing the number of business systems used across the council to
Page 56 of 290

Page 57

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
manage assets. This also advised of the next steps in respect of a
review underway to drive forward the consolidation of assets, both
physical and technology (system) related.
• Implementation of a new cloud-based Microsoft Teams integrated
solution, incorporating virtual voice and digital assistant functionality
is underway in relation to the build and testing of a new unified
comms platform and migrations of 25 school sites.
Digital first
operations
Facilitate fibre-enabled innovation
to maximise the full potential of
Internet of Things (IoT) and
Artificial Intelligence (AI)
technologies in service delivery.
Apr-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• Implementation of procured Wide Area Network solution and
associated technical functionality (such as internet breakout services
and continued development and deployment of fibre across North
Lanarkshire) is ongoing in respect of corporate requirements. Around
80 sites are now live with a public wi-fi service, and the roll out
continues to migrate the remaining 50 sites into the solution.
Implementation is however impacted by site surveys and asbestos
checks by the external contractor.
• Discussions are underway with legal and the supplier to develop and
implement a plan to enable internet access for temporary
accommodation properties.
• Work is also underway in respect of enhancing fibre availability
across North Lanarkshire to provide internet access to residents with
a strategy being drafted for options appraisal.
• Smart Park schemes to gather data within park settings now
operational at Palacerigg Country Park and Strathclyde Country Park
with units active (and on renewables) and fibre connected, meaning
that the data capture process is now underway to enable an initial
review from the sensors.
• Immersive rooms now live at Airdrie Library, Motherwell Library,
Summerlee Museum, and Muirfield Community Centre with services
available to the public and partners.
• Work to create a digital infrastructure development toolkit and
associated processes to enable third party commercial connectivity
providers to deliver services across the council involves discussions
with Glascow City Council to investigate the potential to re-use an
existing process used in their infrastructure model.
Digital first
operations
Transition from using paper-based
storage to a digital solution for
retaining appropriate council
information.
Sep-23 Sep-25 Green At delivery and
ongoing
management
and monitoring
stage.
• Tender issued, responses received, and the evaluation process is
underway with a view to awarding the tender by the end of 2024/25.
Page 57 of 290

Page 58

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)
Performance
optimisation
Develop an efficient digital and IT
cost model to ensure scarce
financial resources are aligned to
vital enabling technologies.
Oct-23 Sep-26 Amber At delivery and
ongoing
management
and monitoring
stage.
• Work is progressing to identify digital and IT spend across the council
and develop a model to establish whether this is essential and priority
spend but this is a complex process as the council’s environment
sees hundreds of applications being used council-wide, with detailed
knowledge of individual items (users, contractual basis) varying
across services and ICT, particularly for long-standing products,
purchased without ICT involvement. Additional time is therefore
necessary for data capture, as such is critical for the analysis stage of
this project.
• Baseline financial information has been sourced for matching with
Business Continuity / Disaster Recovery Plans and CMDB
(configuration management database) and work is underway to
capture non-financial information regarding individual products.
Expertise has been sought from Gartner to support next steps
development in terms of a model to identify priority products to retain,
as well as those to terminate or migrate.
• Work has progressed to develop and deploy structures and
processes that aid the identification and development of operational
innovation and that facilitates beneficial service transformation in
respect of developing supplier relationships. Funding re-profiled to
ensure effectively used once business cases begin to arrive, and
eligibility criteria developed and approved. Further details, including
information in respect of promoting the Innovation Fund and
associated application process, are scheduled to be reported to
committee in cycle 1 of 2025.
Performance
optimisation
Enhance security monitoring to
maintain effective access and
control over council data as the
council delivers the anticipated
increase in its digital footprint.
Feb-24 Dec-27 Green At delivery and
ongoing
management
and monitoring
stage.
• To consider areas in relation to security that can be monitored in
terms of service delivery and to be able to assess performance
against these elements, a range of performance metrics have been
drafted and are in the final approval stages prior to implementing the
supporting processes to ensure the metrics reach appropriate
audience at required intervals.
• Work is progressing to review data assets and solutions delivered by
or in conjunction with third party providers to ensure that suppliers are
consistently assessed and reported upon to enable operational
performance to be effectively managed throughout the duration of
any engagement and a supplier framework has been drafted. This
will be finalised in line with the new Corporate Procurement Supplier
Framework scheduled to be launched soon.
• Work to develop security standards continues to progress to support
existing cyber security controls. This aims to support processes to
Page 58 of 290

Page 59

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
manage and secure council data and systems, assess the risk
associated with data loss, and create an assessment model to
provide meaningful, insightful, and simple representation of the cyber
rating of data control. Recruitment is under way for a temporary
Senior ICT Security Officer post to support the development of
improved ICT technical vulnerability management processes.
One Service
Workforce Further develop workforce plans to
ensure appropriate succession
planning and alignment to the
overall Programme of Work.
Apr-23 Apr-28 Green At delivery and
ongoing
management
and monitoring
stage.
• To support the delivery of all ongoing workforce and structure changes
arising from agreed operating model revisions and future savings
(along with ongoing service realignments linked to the future operating
model), the HR business partner team have supported Chief Officers
and service leads in delivering the changes required. This includes
service reviews for waste (for which an update was provided to
Environment and Climate Change Committee in October 2024 (link)
and the review of community learning and development (link) for
which next steps approvals were received from the Policy and
Strategy Committee in December 2024. Ongoing HR support also
includes ensuring appropriate Trade Union and employee
consultations.
• Work continues with organisation and workforce mapping to identify
plans to support the transition to the council’s future operating model.
This includes a modelling exercise to review service proposals for
employee numbers to operate from a hub base.
• Actions from 2023-25 service workforce plans are in delivery. This
follow updates to plans in advance of the Best Value thematic audit in
relation to workforce innovation in 2024 - for which the outcome report
was positive for the council (link). A full refresh of service workforce
plans for 2025/26 is underway for roll out early in 2025.
• An annual update on One Workforce was presented to the Policy and
Strategy Committee in December 2024 (link). This also sets out a
progress update on the One Workforce Plan and strategic workforce
priorities to 2028, as well as new areas of work aligned to the
recommendations for improvement from the Best Value thematic audit
report in relation to workforce innovation.
Shared services
and
public service
reform
Explore opportunities for shared
services both within the council and
with partners, where appropriate, to
maximise efficiency.
Feb-24 * Green At delivery and
ongoing
management
and monitoring
stage.
• * Timescales and actions are determined by the Improvement Service.
• Representatives from the council are participating in all of the shared
services workstreams which are being led by the Improvement
Service, i.e. procurement, local government statutory and
discretionary services, development of a digital to-be state for local
government, new digital shared services that could be delivered Page 59 of 290

Page 60

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
nationally or regionally, and developing examples of active
communities / participatory design.
• Through participation in the subgroups supporting the workstreams,
representatives from the council respond to requests for information
and feedback as required and continue to provide support and
critically review / input to the project activities.
Shared services
and
public service
reform
Maintain oversight of public service
reform developments and ensure
co-ordinated response to external
decision making which has a
bearing on council service delivery.
Sept-23 * Green Crerar review -
at delivery and
ongoing
management
and monitoring
stage.
Democracy
matters -
complete.
• * Timescales and actions are determined by the Improvement Service.
• Council representatives are participating in all the public sector reform
workstreams which are being led by the Improvement Service, i.e. full
implementation of Crerar for local government and the development of
Democracy Matters 2 as part of the Local Governance Review.
• Through participation in the subgroups supporting the workstreams,
representatives from the council respond to requests for information
and feedback as required and continue to provide support and critical
review and input to the project activities.
Working with
other Boards
Work with other Boards to support
delivery of priorities across the
Programme of Work.
Jun-24 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• Pilot approach complete to maintain strategic oversight of Delivery
Plan dependencies and interdependencies to reduce the risk of
delayed projects, friction projects, and duplication of effort - this is now
being rolled out across the whole Programme of Work.
• Hot spots impacting on the effective delivery of the Programme of
Work are being identified through the quarterly monitoring reports
which are being submitted to each Programme of Work Strategic
Board and the Corporate Management Team. Only two significant hot
spots were identified during 2024 which required to be escalated for
discussion at the Corporate Management Team.
• Ongoing oversight through the quarterly monitoring reports enables
resources to be kept under review to support delivery of both
individual programme of work projects and activities, and also those
that cut across the whole Programme of Work thus enabling best use
of scarce, and often the same, resources. A resource impact
assessment is also monitored through the quarterly monitoring reports
which are submitted to each Board and the Corporate Management
Team. As at 31/03/24 the Resources dimension showed the greatest
variation across all seven Programme of Work priorities in terms of
whether it was (or was not) an issue - this showed that 13.8% of the
overall Programme of Work highlighted an issue with resources; this
decreased to 11.1% as at 30/06/24, 7.1% as at 30/09/24, and 7.6% as
at 31/12/24 - this is continuing to be kept under review by the One
Service Board in line with wider workforce discussions.
Page 60 of 290

Page 61

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)
Working with
other Boards
Ensure practical implementation of
Change Management Framework.
Jun-24 Mar-28 Green At planning and
set up stage.
• As noted against the Digital North Lanarkshire deliverable, a Change
Management Toolkit has been developed to serve as a self-service
mechanism and dynamic online resource able to evolve along with
new practices, new learning, and learning from experience as
progress is made in delivering the Programme of Work. As project
management (with its focus on the organisational aspect of change)
and change management (with its focus on the people aspect of
change) naturally have complementary processes with the same basic
underlying aim - to ensure the long-term success of a programme /
project (and its impact) - this development supports the council’s
overall approach to the changes required to deliver the Programme of
Work.
• Once the closure stage is completed for the corporate toolkit under the
Digital North Lanarkshire Programme of Work, this moves to the One
Service Board for deployment across the organisation.
Working with
other Boards
Lead engagement with staff, trade
unions, and partners about the
Programme of Work to ensure
understanding and alignment.
Apr-24 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• During 2024, a programme of staff roadshows took place to inform
staff of the council’s strategic vision. The roadshows received
considerable investment, with 72 events held across 21 venues in
North Lanarkshire. Over 2,200 staff attended the roadshows. The
sessions were used to engage with staff on ambitions from The Plan
for North Lanarkshire. Engagement from the sessions highlighted
positive staff buy-in, e.g. 81.9% of respondents agreed that the
Programme of Work was getting it right to achieve the right outcomes.
Leadership and
operating model
and
asset
rationalisation
Deliver the continued roll out of the
Leadership and Operating Model to
ensure an effective community
leadership approach, working with
partners, as the hub approach
develops.
Jun-22 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• Completion certificate received for phase 1 works at Broadwood Hub
in Cumbernauld which now allows phase 2 to commence. Phase 2 is
proceeding following recruitment for two Hub Co-ordinator roles which
took up post at the end of January 2025 and next steps will include a
position review with the technical design team on works required.
• Kildonan Street redevelopment delivered successfully from end to end
in 10 weeks.
• Delivery in respect of phase 2 hub space at Calderhead behind
schedule due to resource capacity and volume of projects and same
teams involved in the same aspects across the programme. Options
for out of hours access being taken forward following need to address
supplier issue. Recent recruitment noted above will help to bring this
back on schedule.
• Work in respect of continuing to expand the number of integrated hubs
across the existing estate is progressing in line with the Strategic
Asset Review and Investment Strategy (SARIS) report approved at
Policy and Strategy Committee in September 2024 (link).
• As part of the development of the Cumbernauld Hub, the Housing Page 61 of 290

Page 62

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
team has successfully relocated from Fleming House to Bron Way;
awaiting decision following facility support services review / required
consultation before further moves within Bron Way. Town hub
proposals at early stages.
• Work to gather a baseline understanding of future service delivery
arrangements / requirements as part of phase 2 for the 3-5 year
transition to council’s future operating model is complete. To tie into
the direction set by the aforementioned SARIS report, further
modelling work will be undertaken to review and update the baseline
to provide the intelligence needed to inform next steps investment.
• The One Service Strategic Board has now concluded reviews of all
service areas in respect of workforce planning; this was reflected in
the One Workforce report in December 2024 (link). A summary of
common issues arising from the presentation (in relation to workforce
gaps, services transitioning towards the future operating model, and
digital transformation) is being collated to inform the next steps which -
along with the overall aims of the Programme of Work - are also being
considered within the context of the year three Best Value thematic
audit in relation to Transformation. This will inform One Service Board
discussions on next steps to support the transition to the council’s
future operating model in line with approved service reviews, ongoing
service redesign, and transformation. An update on delivery of the
One Service programme of work was presented to Policy and Strategy
Committee in December 2024 (link).
• Work is ongoing with the Health and Social Care Partnership around
GIRFE (Getting it Right for Everyone) to strengthen early access to
supports and services through new ways of working within a
community hub model. Initial scoping session held to determine
requirements and capacity to deliver from hubs in support of four large
screening areas. Focus group completed with Active 60 group to
engage in digital zone work. Next steps will be to work on a proof of
concept using the Chryston Hub.
• To develop a proof-of-concept model to implement early and inclusive
family support enabled through the community hub model with a no
wrong door approach, work has commenced on scaling up across
communities the model in place at Newmains and St Brigid’s Hub.
• To operationalise a model for new community hubs to support the
transition to future operating model, phase 2 has been accelerated
following the report to Policy and Strategy Committee in June 2024
(link) and subsequent approval in December 2024 (link) for hub
direction. Next update scheduled to be submitted to Policy and
Page 62 of 290

Page 63

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
Strategy Committee in June 2025.
Leadership and
operating model
and
asset
rationalisation
Align the asset rationalisation
strategy with the Leadership and
Operating Model to ensure coherent
phasing and maximise efficiency.
Apr-23 Jul-28 Green At delivery and
ongoing
management
and monitoring
stage.
• To support the redesign of home support services to enable locality
integrated teams and a phased approach, engagement with the
service is complete and needs for Bellshill have been identified.
Proposal for first floor space has been prepared and work is underway
with teams transitioning into the new space to assess usage and
further reconfiguration opportunities. Further engagement planned
with housing and home support regarding proposals in line with
needs.
• To create a One Service operating model within the remaining estate a
number of areas of activity are underway, including work on asset
rationalisation projects and the redesign of Bron Way and Dalziel
Building with the schedule of works now confirmed. Implementation of
the hybrid model for the Civic Campus is now complete.
• Work to identify technology priorities using the digital framework
aligned to the future operating model and its phased approach is now
complete. Implementation has moved to the Digital North Lanarkshire
programme of work where activities underway include identifying the
solution for MFD (multi-functional device) access for staff, progression
of digital zones (including taking forward the zones at Buchanan
Centre and Chryston Community Hub), testing remote access
solutions and rolling this out across identified hub spaces, and
developing a solution for external partners’ access.
• Work is ongoing to implement a corporate telephony solution to
support the introduction of a single contact number and secure
payment portal for the council, with basic functionality currently being
delivered (including dashboard, skills based routing, messaging,
directory) which will allow system rollout to commence.
• To widen the scope of the current Community Asset Transfer Policy to
include all requests from communities to use, manage, lease, or take
ownership of council owned assets, a Community Ownership and
Management of Assets Policy was approved at Policy and Strategy
Committee in June 2024 (link). Community requests are now being
assessed under the new policy. Since then, mapping has been
completed to identify community interest in facilities. Review is
complete in respect of the role of the corporate and leadership groups
(including updated terms of reference and a policy implementation
plan, capital funding criteria developed, and recruitment and
appointment of two dedicated officers to promote the new policy and
build community and voluntary sector capacity around community
ownership and management of assets). New community asset capital
Page 63 of 290

Page 64

Theme /
programme
Deliverables Start
date
End date Overall delivery
RAG
assessment
Completed
status
Position as at December 2024
(including narrative where RAG status is Red or Amber)      
fund launched on social media.
• The move to a cloud based service to support the council's approach
to customer facing communications around more coherent marketing
of assets (linked to corporate booking system) has been delayed but
discussions continue to be able to move forward with this as soon as
possible, this includes developing a proof of concept for the hub model
that uses Coatbridge assets in the pilot. 
Key to completed status
Key stages for the project / activity in the Programme of Work Indicative % completed
assessment 
At initiation stage
Project / activity still at proposal stage, and not yet approved by the relevant SRO / Chief Officer
or approved to Project Brief (or equivalent) stage
or approved to Project Brief (or equivalent) stage, but still in development / at feasibility stage. 
>0% and <15%
At planning and
set up stage
Project / activity approved to Project Business Case (or equivalent) stage
or Project or Delivery Plan developed. >=15% and <25% 
At delivery and ongoing
management and
monitoring stage
Project / activity underway and delivery is categorised as:
< =25% completed
or > 25% but < =50% completed
or > 50% but < =75% completed
or > 75% but < 100% completed. 
>=25% and <95%
Completed or at
closure stage
Project / activity completed and closed off
or final evaluations, handovers, etc still to be undertaken. >=95% and =100% 
Key to RAG status
Blue  Delivery is complete. 
Green
Delivery is on track and in line with the six dimensions within which the project / activity is being delivered (i.e. scope, cost / budget,
quality, resources, risk, within time / on schedule) and the % completed status is as expected as at the time of the delivery
assessment.
Page 64 of 290

Page 65

Amber
Delivery is not on track and the latest assessment suggests there may be emerging issues with one or more of the six dimensions
within which the project / activity is being delivered (i.e. scope, cost / budget, quality, resources, risk, within time / on schedule) and/or
the % completed status is not as expected as at the time of the delivery assessment. 
Red
Delivery is not on track and the latest assessment has reported issues with one or more of the six dimensions within which the project
/ activity is being delivered (i.e. scope, cost / budget, quality, resources, risk, within time / on schedule) and/or the % completed status
is behind that which is expected as at the time of the delivery assessment. 
Page 65 of 290

Page 66

Page 66 of 290

Page 67

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref DM/SL Date 13/03/25 
The latest North Lanarkshire context, challenges, and next steps 
From  Des Murray, Chief Executive  
E-mail murraydes@northlan.gov.uk Telephone 01698 302350 
Executive Summary
The Plan for North Lanarkshire is supported by a suite of high-level Health Check Indicators
that collectively provide the context for North Lanarkshire as a place. 
By providing the local demographic, social, and economic profile these indicators were key
to shaping the long-term vision set out in The Plan for North Lanarkshire when it was
approved in 2019, and they have continued to provide a robust, consistent, and
independent way of assessing progress since then.  The suite of indicators has also played
an important role in terms in informing the council’s strategic planning process through the
Programme of Work.   
The latest results for each of the 28 Health Check Indicators now reflect a period after the
pandemic.  This has enabled a much clearer interpretation of the impact of the pandemic
on what The Plan for North Lanarkshire set out to achieve when it was established.  The
impact can be seen in much of the data for the years 2020 and 2021 (the pandemic years)
compared to 2019 (pre-pandemic) and 2022, 2023, and 2024 (the aftermath of the
pandemic).  Notwithstanding this, there remains significant gains when comparing the
latest results available to the baseline set when The Plan for North Lanarkshire was
established in 2019 - as set out in the summary in Appendix 1. 
The latest results show positive trends in a number of key economic and social indicators,
including:  
• Gross weekly pay continues to show a positive increase for the third year in a row;
wages are level with the national average. For both full-time and part-time workers, the
gap in the hourly rate of pay between males and females continues to narrow and
remains smaller than it is nationally.  
• Following a period of decline and slow recovery, self-employed rates are now showing
a marked improvement that returns this position to pre-pandemic levels.  
• Economic growth continues to show a positive picture with the latest results showing an
increase of almost 9% in gross value added per head.
• The number of working age people claiming employment related benefits has continued
the gradual downward trend that was first experienced towards the end of 2020 and is
now 8% lower than The Plan for North Lanarkshire baseline.  
• School exclusion rates continue to show significant improvement for both measures in
relation to all pupils and looked after children, with the latest figures now below the
national average and the comparator figures for similar councils.
• The gap in educational attainment between overall results and results for pupils living in
Item 4
Page 67 of 290

Page 68

1. Background 
1.1 Since The Plan for North Lanarkshire was established in 2019, it has been supported
by a suite of 28 Health Check Indicators from the Strategic Performance Framework
which aim to collectively provide the context for North Lanarkshire as a place.   
1.2 This suite of measures has been used constantly to provide a robust, consistent, and
independent evidence base to (a) inform strategic planning and delivery priorities, and
(b) demonstrate progress in delivering the Programme of Work and achieving the vision
the 20% most deprived areas shows a decline compared to recent years and is lower
than the national average.
• Life expectancy for males in North Lanarkshire has shown a small gain following two
data series dips in a row.
• Satisfaction levels for carers feeling supported to continue their caring role has improved
in the most recent survey.  
• North Lanarkshire’s waste recycling rates have reached an all-time high and are now
above the national average. 
Further information and analysis in respect of the latest results for the 28 Health Check
Indicators is set out in the deep dive in Appendix 2. 
As noted in the Programme of Work achievements report on the agenda today, the suite of
Health Check Indicators continue to play an important role in informing delivery of the
Programme of Work to 2028 to ensure that the stubborn scale of deprivation in areas that
are hardest to reach is targeted through policy developments that are focused on tackling
unstable trends and improving social conditions.  This is a critical aspect to ensuring the
success of the place based ambition of The Plan for North Lanarkshire, as both place-
based regeneration and person-based policies need to cross policy sectors and be
developed and implemented in tandem - as well as integrated with wider investment and
poverty reduction strategies - if transformational change is to truly make a difference. 
As such a mid-term review of the Programme of Work is underway that is informed by the
latest results for the 28 Health Check Indicators as well as supplementary evidence and
context.  A broad overview of this review is set out in Appendix 3 for information.  
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Are aware of the key role that the Health Check Indicators play in providing the place-
based evidence base from which progress in delivering The Plan for North
Lanarkshire can be regularly assessed, and
(2) Take cognisance of the latest results set out in this report and accompanying
appendices, and the successes and challenges summarised in paragraphs 2.4 and
2.5 respectively. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Page 68 of 290

Page 69

of inclusive growth and prosperity for all as set out in The Plan for North Lanarkshire. 
1.3 In practice, these measures:
• Are long-term measures whose role is to assess the state of a nation, i.e.
North Lanarkshire.  As it can take time to see the impact that outcome focused
planning has for people and communities, maintaining a consistent approach to
measuring progress and reviewing and reporting the results helps to ensure the
focus remains steadfast on what The Plan for North Lanarkshire aims to achieve. 
This approach avoids the temptation to resort to short-term measures that don’t
help sustain the long-term focus required to achieve the long-term vision.
• Aim to provide a high-level impact assessment of the work of the council and
partners on North Lanarkshire’s economy, its people, and its communities.  It is
recognised though that the long-term nature of some investments, time-lags from
investment to seeing results, and the need to make assumptions of impact
(comparing, for example, scenarios that consider impact if there had been no
portfolio of council activity delivered at all) need to be taken into account in this
assessment.
• Comprise a small number of wider landscape measures which focus, where
possible, on outcomes rather than outputs.  In doing so it is recognised that it is
not easy to measure outcomes, or to separate out specific impacts on outcomes
in terms of improving people’s lives as there are many factors in this respect that
are outside the direct control of the council.  
• Are sourced from externally produced statistics, i.e. they are not statistics
calculated by the council and, as such, they provide an external and independent
verification.
• Are available nationally to enable a comparison of North Lanarkshire’s
performance against other local authorities and the national average. 
1.4 This report herewith continues the practice established in 2023 with a separate report
that sets out the current North Lanarkshire context. As well as demonstrating the
change in performance from the baseline set at the time when The Plan for North
Lanarkshire was established, this year’s report comprises a deeper dive into the data
and trends that sit underneath the 28 Health Check Indicators in order to ascertain the
underlying factors key to informing delivery of the Programme of Work to 2028 and its
priorities. 
2. Latest results 
2.1 The suite of 28 Health Check Indicators has been updated with the most recent data
published and available; this data and the latest commentary on the North Lanarkshire
context is set out in Appendix 1.  Note, to aid interpretation and ensure the results are
reviewed within the appropriate context, the indicators depicted in Appendix 1 are not
set out sequentially, rather they are set out in clusters where there are clear linkages to
consider.  A contents page (with quick links) is included in Appendix 1 to provide a
means by which to easily navigate through each of the indicators. 
2.2 The latest results for the 28 Health Check Indicators set out in Appendix 1: 
• Are presented to show the North Lanarkshire position within the relevant context,
such as family group or national averages.    
• Include graphs displaying a long-term time series (where available) in order to
show, for example, trends over time that cover before, during, and in the aftermath
of the pandemic.  Note, some national data sources recalibrate their time series at
every publication, where this is the case the most up to date data is reflected in the
results presented in the Appendix.
Page 69 of 290

Page 70

• Incorporate supplementary measures, commentary, and analysis, where
appropriate for added interpretation. This year’s deep dive into the 28 Health
Check Indicators, and the underlying measures supporting them, aims to clearly
show the North Lanarkshire context in more specific detail.  
• Reflect the baseline for The Plan for North Lanarkshire in the North Lanarkshire
commentary.  This baseline was established using the most up to date data
available at the time The Plan for North Lanarkshire was approved and monitoring
began.  This allows for improvements to be identified over the lifespan of the
council’s corporate strategy. 
2.3 Even with a time lag in some nationally published data, the latest results for all
indicators now reflect a period after the pandemic.  This has enabled a much clearer
interpretation of the impact of the pandemic on what The Plan for North Lanarkshire set
out to achieve when it was established.  The impact can be seen in much of the data
for the years 2020 and 2021 (the pandemic years) compared to 2019 (pre-pandemic)
and 2022, 2023, and 2024 (the aftermath of the pandemic).  Notwithstanding this, there
remains significant gains when comparing the latest results available to the baseline
set when The Plan for North Lanarkshire was established in 2019.   
2.4 For the small number of indicators which are measured quarterly, this data continues
to show a number of significant and positive trends that are encouraging.  These
successes are even more noteworthy given the challenging backdrop they have been
achieved against.  The following represents a high-level summary of key successes
where new data has been available to provide an updated position in this year’s report. 
• The last two year’s annual performance update reported that the gross weekly pay
for local residents was higher than the national average, as shown in Figure 17a
in Appendix 2.  This position continues in the latest data which shows the gross
weekly pay for North Lanarkshire’s residents has reached £740.40 in 2024
compared to £740.00 nationally.  This is an increase of 4.1% (£29.40 per week) in
North Lanarkshire over the year compared to 4.3% (£30.60) nationally.  Figures
17c and 17d show that the gap in hourly pay for full-time and part-time male and
female workers has significantly narrowed over the period of The Plan for North
Lanarkshire with this gap consistently being narrower than it is nationally.
• Following a period of decline of slow recovery, self-employed rates are now
showing a marked improvement that returns this position to pre-pandemic levels
(5.4%).  The latest figures show that 7.3% of the working age population in North
Lanarkshire are in self-employment (Figure 18k in Appendix 2).
• In the years prior to The Plan for North Lanarkshire baseline of 3.5% in December
2018, the number of people claiming employment related benefits had remained
relatively low, increasing only to 3.8% in March 2020 (Figure 20a in Appendix 2). 
2020 figures clearly showed the immediate impact of the pandemic with an
increase to a high of 7.2% in August 2020 which was in line with trends nationally.
After August 2020 figures started on a relatively downward trend (albeit more
gradual towards the end of 2022 and into 2023), with figures as at December 2023
showing 3.3% (7,270) of the working age people now claiming one or more of the
key benefits in North Lanarkshire.  This improvement has continued over the last
year with figures as at December 2024 showing 3.2% (7,070) of the working age
people now claiming one or more of the key benefits, compared to a national
average of 3.1%. 
• Prior to the pandemic, North Lanarkshire had one of the strongest and fastest
growing economies in Scotland, with significant growth year after year and strong
business growth with an increase in the number of businesses per head of
population and jobs safeguarded through support to businesses.  Recent figures
(Figure 16a) show the local economy continues to grow with North Lanarkshire’s
Page 70 of 290

Page 71

growth rate increasing 9% from the previous year (Figure 16b), just below the
national average of 10%. The extent of sustainable growth in North Lanarkshire
can be seen by its ability for strong recovery after the pandemic - Figure 16b shows
movement from a position of -3.1% during the pandemic to the latest figure of
+8.9% in two years - the highest growth level over the period of The Plan for North
Lanarkshire.
• School exclusion rates continue to show significant improvement for both all pupils
and looked after children with the latest figures now below the national average
and the comparator figure for similar councils (Figures 14a and 15a).  Exclusion
rates in North Lanarkshire are now the sixth lowest in Scotland for looked after
children.
• The gap in educational attainment (Figure 12b) between overall results and those
for pupils living in the 20% most deprived areas (12 percentage points) shows
improvement for the second year in a row and is lower than the national average
(16 percentage points).
• Life expectancy for males in North Lanarkshire has shown a small gain for the
second year in a row, following a dip in the preceding years (Figure 23a).
• Satisfaction levels for the proportion of carers feeling supported to continue their
caring role has shown an increase in the recent survey.
• North Lanarkshire’s waste recycling rates have reached an all-time high (46.7%)
and are now above the national average (43.5%) and the comparator figure for
similar councils (40.4%). 
2.5 Previous annual performance reports to the Policy and Strategy Committee (in March
each year) have provided commentary which reflected on the impact of the pandemic,
and the resultant social and economic effects which were considered to have affected
vulnerable people and communities more intensely.  As a result, it was considered there
was a danger that already unacceptably high levels of deprivation and child poverty
would become further exacerbated and while the residual effect in this respect does
remain in some indicators, there are significant improvements to be seen.  However,
when the data in Appendix 2 is reviewed and considered in its entirety this shows  there
are also pockets of areas across North Lanarkshire that are benefiting from these
improvements more so than other areas which means the position remains fragile and
therefore susceptible to any wider (and uncontrollable) economical or environmental
impacts on society.  Challenges therefore remain: 
• After a period of significant improvement in breastfeeding rates the latest figures
remain unchanged from last year in that 30% of babies in North Lanarkshire are
breastfed at the 6-8 week review and getting the best start in life (Figure 09a in
Appendix 2).  While this is an improvement from The Plan for North Lanarkshire
baseline of 23.1% further analysis of other related measures show this rate is 50%
at the first review point (10-14 days old) suggesting further work is required to
secure sustainability in breastfeeding over time.
• While improvements had been noted in a reduction in the proportion of children in
poverty over the period of The Plan for North Lanarkshire (Figure 22a in Appendix
2 shows the decrease from 25.2% to 23.2%), the latest figures show a reversal in
this respect for the second year in a row with rates now reaching 26.9%.  While
this change in trend is in line with the national average, it remains a concern as
almost one in four children in North Lanarkshire are living in poverty - higher than
the national average of just over one in five children.  Of particular concern is the
disparity across North Lanarkshire’s communities which is starting to show
changes across areas over time (Figures 22c, 22d, 22e).
• Figures 18a and 18b in Appendix 2 show that the proportion of the working age
population who are economically active now sits at 74.7% (compared to The Plan
for North Lanarkshire baseline of 77.9%).  This represents an estimated 164,100
Page 71 of 290

Page 72

residents who are economically active in North Lanarkshire.  While this is a
decrease from pre-pandemic levels (170,700 in March 2020), there has been
significant fluctuation in the figures over the years since and the trend does not yet
appear to have stabilised.
• While Figures 18a and 18b in Appendix 2 show that the proportion and number of
the working age population who are economically active had shown intermittent
encouraging signs of improvement, the deep dive in this respect shows 25.3% are
economically inactive (Figures 18c and 18d). Of those recorded as being
economically inactive, there remains 90.9% of the working age population (an
estimated 49,500 people) who are currently recorded as not wanting a job. 
Fluctuations continue in the data for the reasons for this in terms of whether people
are retired, students, looking after family/home, or long-term sick.  Of those long-
term sick (Figure 18j), the latest figures show an increase over the period of The
Plan for North Lanarkshire baseline estimates from 15,800 to 27,000). 
• The deep dive into the latest business survival rates in North Lanarkshire shows a
varying position and an increase from 54% to 55% in previous year, albeit this trend
does follow the national average (Figure 19a).  The deep dive into this data shows
that the early years of implementing The Plan for North Lanarkshire was impacted
by the pandemic. However, this still remains a positive number of active businesses
each year over the period of The Plan for North Lanarkshire, especially considering
the figures clearly show an impact of the pandemic that is being stubborn to fully
recover from. 
• Following previous year’s figures which showed the change in recorded crime in
North Lanarkshire to be lower than the national average, this position has moved
with local rates reaching + 4% which while higher than the national average of +
3.6%, it does follow the national trend.  Notwithstanding the impact of the pandemic
on the number of recorded crimes, the number of crimes in North Lanarkshire
recorded by the police has not returned to pre-pandemic levels and remains lower
than The Plan for North Lanarkshire baseline (Figure 06b).  Figure 6c provides a
breakdown of the crimes recorded by category with crimes of dishonesty remaining
at the highest level over the years, albeit showing gradual reductions. 
Next steps 
2.6 As noted in the accompany report on the agenda today in respect of the Programme of
Work achievements to date, a mid-term review is underway to ensure the Programme
of Work to 2028 continues to remain current, relevant, and deliverable - and takes into
account the latest context available from not only the 28 Health Check Indicators, but
also the recently published Census results.  A broad outline of the context within which
this review is being undertaken is set out in Appendix 3; this will be supplemented by a
wider bank of evidence during the review to help build on the key challenges and inform
the next steps looking forward. The outcome from this review is scheduled to be
reported back to the Policy and Strategy Committee in cycle 4 of 2025.   
2.7 By collectively providing the local demographic, social, and economic profile, the suite
of Health Check Indicators were key to shaping the long-term vision set out in The Plan
for North Lanarkshire when it was established in 2019.  As such, these indicators will
continue to be regularly monitored, assessed, and reported in order to provide a
consistent mechanism to assess progress in delivering The Plan for North Lanarkshire
through incremental short-term changes and impacts, while maintaining a focus on
improving outcomes in the long-term. As such a six-monthly interim update is
incorporated into Programme of Work reporting to the Policy and Strategy Committee,
to complement the annual report and deep dive in cycle 1 each year. 
3. Measures of success
Page 72 of 290

Page 73

3.1 Measures of success will be evidenced through progress being made to deliver the
Programme of Work and ensure the council’s portfolio of programmes, projects, plans,
and activities impact positively on the North Lanarkshire context (evidenced through
the 28 Health Check Indicators) and the achievement of inclusive growth and prosperity
for all (as set out in The Plan for North Lanarkshire). 
4. Supporting documentation 
4.1 Appendix 1:  28 health check indicators - summary of latest results and RAG status. 
Appendix 2: 28 health check indicators - deep dive into the latest results and the   
North Lanarkshire context. 
Appendix 3:  Programme of Work mid-term review - overview. 
Des Murray
Chief Executive
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Page 73 of 290

Page 74

Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The Local Government Act 1992 established the role of the Statutory Direction to
direct the “publication of information as to standards of performance”.  
The Local Government in Scotland Act 2003 introduced the duty of Best Value; this
requires that councils “make arrangements to secure continuous improvement in
performance”.  
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Ensuring an evidence based approach to strategic planning, performance
monitoring, and stakeholder reporting contributes towards mitigating the risks on
the Corporate Risk Register for the governance, leadership, and decision making
risk and the managing strategic change risk which has been reframed to reflect the
risk in relation to delivery of the approved programme of work.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)?
Page 74 of 290

Page 75

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 75 of 290

Page 76

50%
improved over the
period of The Plan
for North
Lanarkshire
Gross weekly pay
£740.40
+ 35.7%
£545.70
Benefits claimants
3.2%
- 8.6%
3.5%
Growth in GVA per
head
£27,131
+ 28%
£21,188
Employment in
sustainable tourism
29.4%
+ 14.8%
25.6%
Pupils gaining 5+
awards at level 6
35%
+2.9%
34%
Pupils gaining 5+
awards at level 6
(SIMD)
23%
+ 15%
20%
Positive
destinations
94.7%
+ 3.2%
91.8%
School exclusion
rate, all pupils
11.6 per 1,000
pupils
- 67%
35.1
School exclusion
rate, looked after
26.7 per 1,000 
pupils
- 91.6%
317.9
Key to diagram
Indicator title
latest results
% change from baseline
The Plan for North
Lanarkshire baseline figure
Household waste
recycled
46.7%
+ 13.6%
41.1%
Population
estimates
341,890
+ 0.6%
339,960
Est housing by
tenure
159,021
+ 2.5%
155,155
Net migration
1.61 per 1,000
population
- 30.6%
2.32
GVA per head
sustainable tourism
£15,635
+ 8.2%
£14,449
No formal
qualifications
14.3%
+ 5.1%
13.6%
Supported at home
to live
independently
67.7%
- 10.2%
75.4%
Supported at home
to improve /
maintain quality of
life
67.7%
- 10.4%
75.6%
Carers supported
to continue in
caring role
28.5%
- 14.2%
33.2%
Economically active
74.7%
- 4.1%
77.9%
Neighbourhood
rating as place to
live (SIMD)
88%
0%
88%
Neighbourhood
rating as a place to
live - all
93%
- 2.1%
95%
Life expectancy at
birth - male /
female
74.9 / 78.7
- 0.5% / - 0.9%
75.3 / 79.4
Children with no
concerns at 27-30
month review
79.6%
- 1.7%
81%
Businesses 3-year
survival rate
55%
- 6.3%
58.7%
Change in
recorded crime
4%
+ 21.2%
3.3%
Population
projections
-0.9%
> -100%
+ 0.1%
Breastfeeding
30%
+ 29.9%
23.1%
Children in poverty
26.9%
+ 6.7%
25.2%
50%
not improved over
the period of The
Plan for North
Lanarkshire
as at March 2025
The Plan for North Lanarkshire 28 health check indicators Appendix 1
Page 76 of 290

Page 77

Strategic Performance Framework: the North Lanarkshire context
as at March 2025
Appendix 2
Page 77 of 290

Page 78

Indicator
click on links
below for easy
access to each
indicator
Page
number
C17: Gross weekly pay - residents (full-time employees) link to page 3
C16: Gross Value Added - growth per head (income approach) link to page 4
C18: Economically active - % of all people economically active (aged 16-64 years)  link to page 5-6
C20: Benefits - % of working age people (aged 16-64 years) claiming one or more of the key benefits link to page 7-8
C19: Businesses - % of the VAT / PAYE registered businesses that survive for at least three years link to page 9
C27: Employment - total employment in sustainable tourism as % of growth sector employment link to page 10
C28: Gross Value Added - per head in sustainable tourism (employment) link to page 10
C11: Educational attainment - % of pupils gaining 5+ awards at level 6 link to page 11
C12: Educational attainment - % of pupils living in 20% most deprived areas (as defined by the SIMD) gaining 5+ awards at Level 6 link to page 12
C13: Post school destinations - % of pupils entering positive destinations link to page 13
C21: Qualifications - % of the working age population (aged 16-64 years) that have no formal qualifications link to page 14
C14: School exclusion rate per 1,000 pupils - all children link to page 15
C15: School exclusion rate per 1,000 pupils - looked after children link to page 15
C22: Poverty - % of children in poverty after housing costs link to page 16
C10: Child wellbeing - % of children reviewed at 27 to 30 months with no concerns recorded link to page 17
C09: Breastfeeding - % of babies breastfed at 6-8 week review (overall rate) link to page 18
C23: Life expectancy at birth - estimates (males and females) link to page 19
C24: Independent living - % of adults supported at home who agreed that they are supported to live as independently as possible link to page 20
C25: Quality of life - % of adults supported at home who agree their services and support had an impact on improving or maintaining their quality of life link to page 20
C26: Carers - total combined % of carers who feel supported to continue in their caring role link to page 20
C06: Crime - % change in total recorded crime link to page 21
C05: Household waste - % recycled link to page 22
C07: Rating of neighbourhood (includes all neighbourhoods) - % good / very good ratings link to page 23
C08: Rating of neighbourhood as a place to live (includes only the 20% most deprived neighbourhoods, as defined by the SIMD) - % good / very good ratings link to page 23
C04: Housing - estimated housing by tenure link to page 24
C03: Net migration - total rate per 1,000 population link to page 25
C01: Population projections - % change link to page 26
C02: Population - mid-year estimates (mye) link to page 26
Contents
Page 78 of 290

Page 79

C17: Gross weekly pay - residents (full-time employees)
Measuring this indicator will tell us if we have:  Increased the earnings of people who live in NL.
What success looks like:  Earnings for people who live in NL continue to grow on a par with national levels.
The latest North Lanarkshire commentary:
• Gross weekly pay for NLs residents became higher than the average earnings for Scotland for the first time ever in 2022; latest results shows this positive position remained into 2023 and 2024 (as shown in
Figure 17a).  In 2022, gross weekly earnings for NLs residents were £657.90 (compared to a national average of £641.30) - this increased to £711.00 in 2023 (compared to a national average of £709.40)
and has increased again to £740.40 in 2024 (compared to a national average of £740). 
• Traditionally, while wages have risen steadily for the people who live in NL, this had previously been at a lesser rate than average earnings for Scotland.  The Plan for North Lanarkshire baseline set in 2018
saw gross weekly earnings to be £545.70; at the time this was £17 lower than the national average of £562.70.  Prior to this the widest gap in average earnings for NL compared to Scotland was £42 in 2009
before the gap reduced to its narrowest point in 2019 (£11.10) just before the pandemic.
• Figure 17b shows the difference between the average gross weekly pay in NL compared to Scotland, which has improved over the period of The Plan for North Lanarkshire from £17 lower to £0.40 higher.
Average hourly pay - full-time workers
• The average hourly pay of full-time workers in NL (excluding overtime) increased £0.74 from £20.14 per hour in 2023 to £20.80 per hour in 2024.  This compares to a £0.88 increase nationally from £21.19 to
£22.07 per hour over the same period.
• On average the current hourly pay for full-time workers for males in NL is £21.12 compared to £20.38 for females (and compared to £22.59 and £21.41 nationally for males and females respectively).
• Figure 17c shows the gap in average hourly pay for full-time workers for males compared to females which has narrowed over the period of The Plan for North Lanarkshire from £1.66 per hour to £0.74 per
hour (compared with a gap nationally from £1.83 to £1.18 over the same period).  The gap between the average hourly pay for full-time workers for males and females in NL has now been smaller than it is
nationally for the last three years.
Average hourly pay - part-time workers
• The average hourly pay of part-time workers in NL (excluding overtime) increased £1.52 from £12.22 per hour in 2023 to £13.74 per hour in 2024.  This compares to a £1.14 increase nationally from £15.40
to £16.54 per hour over the same period.
• On average the current hourly pay for part-time workers for males in NL is £11.87 compared to £12.36 for females (and compared to £13.62 and £15.86 nationally for males and females respectively).
• Figure 17d shows the gap in average hourly pay for part-time workers for males compared to females which has narrowed over the period of The Plan for North Lanarkshire from +£0.67 per hour to -£0.69
per hour (compared with a gap nationally from +£1.83 to -£1.97 over the same period).  This means that over the period of The Plan for North Lanarkshire average hourly pay for males has moved from
being £0.67 above females in 2018 to £0.69 below in 2024 - this mirrors the national trend.
• The gap between the average hourly pay for part-time workers for males and females in NL has now been smaller than it is nationally for the last three years.
Notes:
• All data above is derived from a single
annual survey of hours and earnings;
it therefore represents a sample of the
population.
3
link to contents page
Page 79 of 290

Page 80

C16: Gross Value Added - growth per head (income approach)
Measuring this indicator will tell us if we have:  Increased NLs economic output.
What success looks like:  Continued economic growth in NL.
The latest North Lanarkshire commentary:
• The latest data published shows that GVA growth remains positive suggesting NLs
economy continues to grow, this follows a dip in 2020 which mirrored the national
position (as shown in Figure 16a).
• Looking at the baseline for The Plan for North Lanarkshire, GVA per head of
population at current prices shows that NL has seen a rise of 28% from £21,188 in
2016 to £27,131 in 2022, compared to an increase of 22.7% nationally over the
same period.
• Figure 16b above displays the % change in economic growth from one year to the
next  - the historical trends for the last 10 years and beyond not only show a positive
trend (which has continued over the period of The Plan for North Lanarkshire), it
also shows economic growth in NL has steadily remained in line with, or above, the
national average. 
• The latest data shows an 8.9% increase in GVA per head in NL from 2021 to 2022
which is an improvement from 6.1% in the previous year’s figures and higher than
the position just before the pandemic of 4.4% (2019).
• The position nationally over the same period shows current growth of 10% which is
an improvement from 7.4% in the previous year’s figures and higher than the
position just before the pandemic of 3.4% (2019)
• While there is a time lag in the availability of these results, the period covered by
this data clearly reflects the impact of the pandemic with a dip in 2020 followed by
successive years of growth. 
• The extent of growth in NL shows movement from a position of -3.1% during the
pandemic to the latest figure of +8.9% in two years.
Notes:
• This measure uses the income approach which allocates income to the region in
which the economic activity takes place.  The data in this entire time series is
rebased and recalculated each year at current basic prices when new results are
produced. 
4
link to contents page
Page 80 of 290

Page 81

C18: Economically active - % of all people economically active (aged 16-64 years)  
Measuring this indicator will tell us if we have:  Increased the number of NLs residents in employment.
What success looks like:  More people aged 16 to 64 living in NL are economically active and contributing to the local / national economy.
The latest North Lanarkshire commentary:
Economically active:
• Figure 18a shows not only a period of relative stability over the 10 years prior to 2020, but also that the % of people economically active in NL exceeded the national average at times.  This period included
the 2018 baseline for The Plan for North Lanarkshire and shows that NL figures continued to follow the national average throughout 2019 and into early 2020.
• In 2020 this indicator started to show a decline from 77.2% and remained unsteady before reaching its lowest point to date as at September 2022 (68.8%); the timing of this suggests figures were impacted
by the pandemic.  Small gains were recorded thereafter, with the most noticeable an increase for 4 consecutive quarters from 68.8% as at September 2022 to 75% as at September 2023.  Since
September 2023 figures have remained higher than the pandemic recovery period in 2021 and 2022 but have not reverted back to pre-pandemic level in 2019 (78.1%)
• The latest result as at September 2024 shows 74.7% of the working age population economically active compared to a national average of 76.6%.  In NL, this equates to 164,100 residents economically
active in NL (Figure 18b); this is a decrease from March 2020 (170,700) and figures have not yet returned to the pre-pandemic level in 2019 (174,000).
Economically inactive:
• There are many other factors which contribute to a full analysis of employment in NL, one is economic inactivity.  Figure 18c shows a steady trend from 2009 to 2019, but an increase from 21.9% in 2019
to the highest to date of 31.2% as at September 2022, before dropping to 25% as at September 2023.  September 2024 figures show little change at 25.3%.
• Figures 18d shows this equates to 47,700 people in 2019, increasing to 69,100 as at September 2022, and decreasing to 55,100 as at September 2023.  September 2024 figures show a decrease to
54,500.
• Figure 18e shows the proportion of people economically inactive that do not want a job has increased from 80.9% to 90.9% over the period of The Plan for Lanarkshire with varying fluctuations in the data
over the years in between.  Figure 18f above shows that over the period of The Plan for North Lanarkshire this represented an increase from 39,400 to 49,500 people.  This is an increase from 45,000 as
at September 2023 to 49,500 as at September 2024.
• Figure 18e shows much greater fluctuation in the data for the % economically inactive compared to the national average which currently sits at 83.6%.
This analysis continues
on the next page / …
Notes
• This data comes from the Annual Population Survey (APS), the largest regular household survey in the UK. It includes data from the Labour Force Survey (LFS), plus further
sample boosts. The survey includes data from a sample and, as such, are estimates which are subject to sampling variability.
• A person's economic activity is derived from their activity last week; people who are economically active are those who are either in employment or unemployed (but actively
looking for work, waiting to start a new job, or available to start a new job). The trends in this indicator should be considered alongside indicator C20 for the % of working age
people claiming benefits.
• Economically inactive people are those who are neither employed nor unemployed; they're not in paid work, but they're also not looking for a job or available to start work. A
person might be economically inactive for a number of reasons, such as being retired, a student, or too ill to work.
5
link to contents page
Page 81 of 290

Page 82

The latest North Lanarkshire commentary:
• The latest figures show that of those economically inactive, 9% are retired, 19% are looking after home/family, 15% are students, 50% are
long-term sick, with the remainder classed as other.  Of those recorded as economically inactive, 90.9% don’t want a job - this is mainly
down to the aforementioned reasons.  Trends are summarised below.
- For students (Figure 18g), the trend has been varied increasing from 11,000 people in 2019 to 15,200 as at March 2021 before decreasing
to 9,600 as at March 2022 and then an almost continual upward trend to 16,700 as at September 2023.  Over the last year figures have
decreased to 8,300 as at September 2024.  Over the period of The Plan for North Lanarkshire the number of students has decreased from
13,100 to 8,300, with significant fluctuations over that time.
- For those retired (Figure 18h), there was an increase from 5,900 people in 2019 to the highest point of 9,800 as at December 2021, before
this has seen an almost continual downward trend to 5,3For long-term sick (Figure 18i), there was an increase from 14,900 people in 2019
to the highest point of 29,800 as at December 2021, before this has seen an almost continual downward trend to 20,600 as at September
2023, before a gradual increase over the last year to 27,000 as at September 2024.  Over the period of The Plan for North Lanarkshire the
number of people long-term sick has increased from 15,800 to 27,000, with some fluctuations over that time.
Self-employed
• Figure 18k shows that the number of people who are self-employed in NL as a proportion of the working age population was
7.8% in 2019, prior to the pandemic.
• Self-employed rates then experienced an almost continual downward trend to 3.7% as at  December 2021.
• Since December 2021 figures have fluctuated, reaching a high of 6.6% as at December 2022 before dropping to 4.2% as at
September 2023 and 3.9% as at December 2023 (compared to 7.8% nationally). These rates account for 18,000 people in 2019
dropping to 9,800 as at December 2021.  This fluctuation continued with 14,900 people self-employed as at December 2022,
before dropping to 10,900 as at September 2023 and 10,700 as at December 2023.
• The latest figures as at September 2024 show a marked increase for two consecutive quarters to 7.3% (compared to 8.2%
nationally)
• The latest rates account for 17,500 people self-employed as at September 2024 - a significant increase that returns self-
employment levels in NL to pre-pandemic figures.
• As shown in Figure 18m, over the period of The Plan for North Lanarkshire the number of people self-employed has decreased
slightly from 17,800 to 17,500, with significant fluctuations over that time.
Notes:
• People who are economically inactive are those not in employment and who do not meet the criteria for
unemployment; this group includes those who want a job but who have not been seeking work in the
last 4 weeks, those who want a job and are seeking work but not available to start, those who do not
want a job, and those in retirement.
Notes:
• Self-employed are those people who regard themselves as self-employed, i.e. where is their main
employment, whether or not they have employees.
6
link to contents page
- For long-term sick (Figure 18i), there was an increase from 14,900 people in 2019 to the highest point of 29,800 as at December 2021, before this has seen an almost continual downward trend to
20,600 as at September 2023, before a gradual increase over the last year to 27,000 as at September 2024.  Over the period of The Plan for North Lanarkshire the number of people long-term sick has
increased from 15,800 to 27,000, with some fluctuations over that time.
- For looking after family / home (Figure 18j), there was an increase from 8,500 people in 2019 to the highest point of 17,500 as at June 2021, before this has seen an almost downward trend to 7,600 as
at September 2023, before a gradual increase over the last year to 10,300 as at September 2024.  Over the period of The Plan for North Lanarkshire the number of people retired has increased from
9,700 to 10,300, with some fluctuations over that time.
Page 82 of 290

Page 83

C20: Benefits - % of working age people (aged 16-64 years) claiming one or more of the key benefits
Measuring this indicator will tell us if we have:  Reduced the number of residents reliant on employment related benefits.
What success looks like:  All of NLs residents capable of working are sustaining employment.
The latest North Lanarkshire commentary:
Overall claimant count
• In the years prior to The Plan for North Lanarkshire baseline of 3.5% in December 2018, claimant count
for NL had remained relatively low, increasing only to 3.8% in March 2020.  April 2020 figures clearly
showed the immediate impact of the pandemic with a rise to 6.1% in NL compared to 5.4% nationally. 
At this time, figures continued to increase to a high of 7.2% in August 2020 which was in line with trends
nationally.
• After August 2020 figures started on a relatively downward trend (albeit more gradual towards the end of
2022 and into 2023), with figures as at December 2023 showing 3.3% of the working age people now
claiming one or more of the key benefits in NL, compared to a national average of 3%.
• This improvement has continued over the last year with figures as at December 2024 showing 3.2% of
the working age people now claiming one or more of the key benefits in NL, compared to a national
average of 3.1%.
• The latest claimant count rate for NL (3.2%) is now lower than The Plan for North Lanarkshire baseline
of 3.5%, with the number of people now claiming one or more of the key benefits 7,070 compared to the
baseline of 7,675.
• The figures as at December 2023 equate to 7,270 people claiming work related benefits in NL - this has
decreased over the last year with figures as at December 2024 showing 7,070 - the lowest figure
recorded since mid 2018.
Claimant count by age
• Figure 20c shows claimant count by age group, with those aged 25-49 accounting for over half of the
claimants in NL, and this proportion increasing from 55% to 58% over the period of The Plan for North
Lanarkshire. 
• Those age 16-17 account for the lowest proportion with less than 1% across the time series and the
period of The Plan for North Lanarkshire.
• Those aged 50+ currently represent 23% of claimants (a decrease from 25% over the period of The
Plan for North Lanarkshire).
• Those aged 18-24 currently represent 18% of claimants (a decrease from 20% over the period of The
Plan for North Lanarkshire).
7
This analysis continues
on the next page / …
Notes:
• The Claimant Count is the number of people claiming benefit principally for the reason of being unemployed.
This is measured by combining the number of people claiming Jobseeker's Allowance (JSA) and National
Insurance credits with the number of people receiving Universal Credit principally for the reason of being
unemployed. Claimants declare that they are out of work, capable of, available for and actively seeking work
during the week in which the claim is made.
• The trends in this indicator should be considered alongside indicator C18 for the % of all people
economically active.
link to contents page
Page 83 of 290

Page 84

8
Claimant count by age
• Over the period of The Plan for North Lanarkshire:
Aged 25-49
- The number of people aged 25-49 claiming benefits had seen an increase from 4,205 in December 2018 to 4,460 in December 2019
followed by a steady incline to 8,790 in August 2020.
- After that, the trend shows a continual decline to a low of 4,400 in December 2023 and then further to a low of 4,110 in December 2024 (as
shown in Figure 20e).  This trend was in line with the national average
- However, there are currently 3.8% of the working age population in NL who are aged 25-49 and claiming benefits - the same as The Plan
for North Lanarkshire baseline of 3.8% but higher than the national average of 3.5% for this age group (as shown in Figure 20d).  This age
group is also higher than the overall NL claimant rate of 3.2% (as shown in Figure 20a on the previous page).
Aged 18-24
- The number of people aged 18-24 claiming benefits had seen an increase from 1,505 in December 2018 to 1,460 in December 2019
followed by a steady incline to 3,340 in August 2020.
- After that, the trend shows a continual decline to a low of 1,330 in December 2023 and then further to a low of 1,295 in December 2024 (as
shown in Figure 20g above).  This trend was in line with the national average
- While there are 4.7% of the working age population in NL who are aged 18-24 and claiming benefits (lover than The Plan for North
Lanarkshire baseline of 5.3%) this is still above national average of 4.2% for this age group (as shown in Figure 20f) and higher than the
overall NL claimant rate of 3.2%.
Aged 50+
- The number of people aged 50+ claiming benefits had seen a small decrease from 1,915 in December 2018 to 1,910 in December 2019
followed by a steady incline to 3,650 in August 2020.  After that, the trend shows a continual decline to 1,480 in December 2023 (as shown
in Figure 20i above) before increasing gradually over 2024 to 1,605 in December 2024.
-  While there are 2.2% of the working age population in NL who are aged 50+ and claiming benefits, this is in line with the trend nationally
(2.2%) and lower than the overall claimant rate of 3.2% (as shown in Figure 20h).  Latest figures are lower than The Plan for North
Lanarkshire baseline of 2.7%.
Aged 16-17
- The number of people aged 16-17 had seen a slight increase from 50 in December 2018 to 60 in December 2019 followed by a steady
incline to a high of 105 in October 2020 (as shown in Figure 20k).
- After that, the trend shows a continual decline to a low of 55 in December 2023 before increasing to 65 in December 2024.  This is in line
with the national trend and the latest rates in NL are less than 1% (as shown in Figure 20j) and equal to the national average. link to contents page
25 to 49 18 to 24 50+
16-17
Page 84 of 290

Page 85

C19: Businesses - % of the VAT / PAYE registered businesses that survive for at least three years
Measuring this indicator will tell us if we have:  Increased and sustained new businesses in NL.
What success looks like:  More locally generated and incoming businesses being created, surviving, and sustaining in the longer-term.
The latest North Lanarkshire commentary:
• The latest business survival rates in NL show a varying position.  For business registered and surviving for at least three years
Figure19a shows that the latest result in this respect is 55%, a slight increase from the previous year of 54%.  This latest trend
follows an increase in the national average, although to a lesser extent.
• To review this in more context Figure 19b shows the shows the number of active NL businesses each year, as at 2023 this
shows there were 7,835 businesses, a decrease from a pre-pandemic high of 8,110 in 2019. However, this still remains a
positive number of active businesses each year over the period of The Plan for North Lanarkshire, especially considering the
figures clearly show an impact of the pandemic that is being stubborn to fully recover from.
• Figure 19c shows the number of new NL businesses registered each year which are used in the survival assessment; over the
period of The Plan for North Lanarkshire this has increased from 1,090 to 1,140.  The dip in 2020 to 980 businesses again
shows the impact of the pandemic.
• Figure 19d allows for a wider overview of business survival, i.e. the rate of survival after 1, 2, 3, 4, and 5 years.  Again, this
shows a varying picture, but the most significant point is the reducing survival rate as the years progress, for example 94.9% of
businesses registered in 2018 survived for 1 year (i.e. to 2019), 74% for 2 years (i.e. to 2020), 58.1% for 3 years (i.e. to 2021),
48.4% for 4 years (i.e. 2022), and 44.7% for 5 years (i.e. to 2023).
9
Notes:
• Business sustainability data comes from the Businesses
Demography 2023 publication (published in November 2024)
and produced by the Office for National Statistics (ONS) using
data from the Inter-Departmental Business Register (IDBR).
The main administrative sources for the IDBR are VAT trader
and PAYE employer information passed to the ONS by HM
Revenue and Customs under the Value Added Tax Act 1994. 
For VAT traders and the Finance Act 1969 for PAYE
employers, details of incorporated businesses are also passed
to ONS by Companies House.
• It is worth noting the time lag in the business sustainability
data, with 2022 being the latest data available.
link to contents page
Page 85 of 290

Page 86

C27: Employment - total employment in sustainable tourism as % of growth sector
employment
The latest North Lanarkshire commentary:
• Sustainable tourism is one of 6 sectors used to assess growth in employment.  Figure 27a above
reflects employment in NL in each of the 6 growth sectors. 
• As shown in Figure 27b above, employment in sustainable tourism sector in NL as a proportion of
employment in all 6 sectors combined has remained at a relatively steady level over the years and the
trend has generally followed the national average.
• Figures for the growth rate in NL in 2021 showed a positive increase to 28.6% when growth was higher
than the national average.  This positive growth has continued with a further increase to 29.4% in both
2022 (above the national average) and 2023 (slightly lower than the national average).  Latest figures
still represent an increase from The Plan for North Lanarkshire baseline (25.2% in 2017).
The latest North Lanarkshire commentary:
• GVA (£) per head in sustainable tourism has fluctuated in NL over the period of the reported data
and from The Plan for North Lanarkshire baseline (as depicted in Figure 28a above and also
reflected in Figure 28b above which shows the percentage year to year change in GVA per head).
• NLs trend has followed the national trend, albeit with a greater degree of fluctuation.
• The effects of the pandemic can be seen in the 2020 figures with a 33% decrease in sustainable
tourism employment in the national average compared to a 50% decrease in North Lanarkshire. 
• In 2021, North Lanarkshire's recovery of +£6,468 per head amounts to an 88.8% increase on the
previous year, compared to a national average of +£2,692 (+19.9%).  The latest figures for 2022 
show a 5.1% increase from 2021 in North Lanarkshire compared to a 33.4% increase nationally.
C28: Gross Value Added - per head in sustainable tourism (employment)
Measuring these 2 indicators will tell us if we have:  Increased benefit from tourism in NL.
What success looks like:  Continued economic growth in this sector.
10
Notes:
• Scotland's Economic Strategy (2015) identified sectors where Scotland has a distinct comparative advantage: food and drink (including agriculture and fisheries), creative
industries (including digital), sustainable tourism, energy (including renewables), financial and business services, and life sciences.  Growth sector definitions are based on
Standard Industrial Classification (SIC) Codes 2007. 
• The Sustainable Tourism sector relates to: Hotels and similar accommodation, Holiday and other short-stay accommodation, Camping grounds, recreational vehicle parks and
trailer parks, Restaurants and mobile food service activities, Beverage serving activities, Tour operator activities, Other reservation service and related activities, Museum
activities, Operation of historical sites and buildings and similar visitor attractions, Botanical and zoological gardens and nature reserve activities, Operation of sports facilities,
Other sports activities (not including activities of racehorse owners), Activities of amusement parks and theme parks, and Other amusement and recreation activities. link to contents page
Page 86 of 290

Page 87

C11: Educational attainment - % of pupils gaining 5+ awards at level 6
The latest North Lanarkshire commentary:
Educational attainment awards at Level 6
• Educational attainment at this level in NL shows the trend for the last three years to be in line with the national
and family group averages.
• All have experienced a slight decrease - with NL decreasing from 36% in 2021-22 to 35% in 2022-23 compared
to a decrease of 39% to 38% over the same period nationally.  NLs latest figures remain higher than the family
group (32%).
• The latest figures in Figure 11a (35% in 2022/23) show an improvement from The Plan for North Lanarkshire
baseline (34% in 2017/18).
Educational attainment awards at Level 3
• While SCQF Level 6 provides a measure for those achieving at the highest level in school, it does not provide a
picture of those who have chosen other pathways.  For example, latest results show that 97.1% of all pupils in NL
achieved 1 or more awards as SCQF level 3 or above compared to a national average of 97.8%.  This means, as
shown in Figure 11b (the converse), that 2.9% of all pupils in NL achieved no passes at this level compared to a
national average of 2.2%.
• The latest figures in Figure 11b (2.9% in 2022/23) show an improvement from The Plan for North Lanarkshire
baseline (3.5% in 2017/18).
Educational attainment - looked after children
1+ awards at SCQF Level 3
• Latest figures in Figure 11c show 87% of looked after children in NL achieved one or more awards at SCQF level
3 compared to the national average (86%).
• The latest figures in Figure 11c (87% in 2022/23) show an improvement from The Plan for North Lanarkshire
baseline (72% in 2017/18), but as can be seen in Figure 11c there has been fluctuation in the figures over the
years.
1+ awards at SCQF Level 4
• Latest figures in Figures 11d show 72% of looked after children in NL achieved one or more awards at SCQF
level 4 compared to the national average (76%).
• The latest figures in Figure 11d (72% in 2022/23) remains the same as The Plan for North Lanarkshire baseline
(72% in 2017/18), but as can be seen in Figure 11d there has been significant fluctuation in the figures over the
years.
Measuring this indicator will tell us if we have:  Improved the outcomes for NLs young people.
What success looks like:  Every child leaving a NL school achieves a basic qualification as a minimum, or qualifications that support their chosen pathway.
11
Notes:
• Due to the pandemic, the time period covered by the data reflects four distinct approaches to assessment and
certification of SQA attainment.  This includes a longstanding use of exams and externally assessed
coursework (pre-pandemic), the use of estimates as a basis for awards in 2020, an Alternative Certification
model in 2021, and the return of formal exams in 2022 with adjustments in place to mitigate the ongoing
effects of the pandemic. 
• The different circumstances and awarding processes of 2019, 2020, 2021, and 2022 do not therefore allow for
a wholly accurate comparison across the years and therefore this context needs to be taken into account
when reviewing the data and trends for indicators C11 and C12.
link to contents page
Page 87 of 290

Page 88

C12: Educational attainment - % of pupils living in 20% most deprived areas (as defined by the Scottish Index of Multiple Deprivation) gaining 5+ awards at Level 6
Measuring this indicator will tell us if we have:  Improved the outcomes for the young people living in NLs most disadvantaged communities.
What success looks like:  Having no gap in attainment levels across all of NL.
The latest North Lanarkshire commentary:
• Educational attainment for pupils living in the 20% most deprived areas continues to improve from The Plan for
North Lanarkshire baseline as shown in Figure 12a (20% in 2017/18 to 23% in 2022/23) and is higher than the
national and family group averages (both 22%).
• There is however still a marked difference in attainment at this level for those pupils living in the 20% most
deprived areas, compared to the overall student population (indicator C11). 
• Between the overall figure (C11), and that for those living in the most deprived areas (C12), the gap in NL is
smaller than it is nationally.  There remains a 12 percentage points difference in attainment at SCQF level 6 or
above in 2022/23 in NL compared to a 16 percentage point gap nationally.
• The gap in NL has decreased over the period of The Plan for North Lanarkshire (as shown in Figure 12b) from 14
percentage points on 2027/28 to 12 percentage points in 2022/23.
12
link to contents page
Notes:
• Due to the pandemic, the time period covered by the data reflects four distinct approaches to assessment and
certification of SQA attainment.  This includes a longstanding use of exams and externally assessed
coursework (pre-pandemic), the use of estimates as a basis for awards in 2020, an Alternative Certification
model in 2021, and the return of formal exams in 2022 with adjustments in place to mitigate the ongoing
effects of the pandemic. 
• The different circumstances and awarding processes of 2019, 2020, 2021, and 2022 do not therefore allow for
a wholly accurate comparison across the years and therefore this context needs to be taken into account
when reviewing the data and trends for indicators C11 and C12.
Page 88 of 290

Page 89

13
C13: Post school destinations - % of pupils entering positive destinations
The latest North Lanarkshire commentary:
• The proportion of pupils leaving school in NL and entering a positive destination reached its highest level to date in
2022/23 with 94.7% which is an improvement from The Plan for North Lanarkshire baseline of 91.8% (in 2016/17) as
shown in Figure 13a.
• The latest result of 94.7% equates to 3,796  leavers achieving a positive destination out of 4,007 meaning 211 leavers did
not achieve a positive destination (as reflected in Figure 13b).
• Reviewing the % result for this indicator does not necessarily show the full position in terms of the number of leavers
achieving a positive destination.  A more meaningful result is the number of pupils not achieving a positive destination
over the years.  As shown in Figure 13b this has remained above 200 for the last six years, although as can be seen from
the graph this is a significant reduction from the years prior to that.
• However, the number of pupils not entering a positive destination has improved by around 92 leavers over the period of
The Plan for North Lanarkshire.
Positive destinations
• Figure 13c shows the main destinations for leavers (higher education, further education, employment, and training) where
the data reflects a decline in numbers over the period of The Plan for North Lanarkshire for all except training.
• Notes: Figure 13c only reflects the 4 main positive destinations so figures will not add up to the totals in Figure 13b
Measuring this indicator will tell us if we have:  Improved the further education and employment prospects for NLs young people.
What success looks like:  Every child leaving a NL school is able to share equally in the improving economic picture and achieve the pathway they wish to.
link to contents page
Notes:
• This measure counts school leavers from publicly funded mainstream schools  and reports initial destinations for
school leavers approximately three months after the end of the school year.
Page 89 of 290

Page 90

C21: Qualifications - % of the working age population (aged 16-64 years) that have no formal qualifications
Measuring this indicator will tell us if we have:  Increased the qualification levels of NLs workforce.
What success looks like:  An increase in formal qualifications are important for the working age population in order to increase skills and flexibility within the workforce.
The latest North Lanarkshire commentary:
Data sourced from the Annual Population Survey
• Figure 21a shows a general downward trend over the years to 12.8% in 2020 which shows ongoing
improvement in terms of the proportion of NLs working age population that have no formal qualifications.
• Latest results in 2021 show an increase to 18.6% before a decrease to 14.4% in 2022 and 14.3% in 2023. 
Figures over this period show greater fluctuation in NL than in the overall national position which has
increased from 7.7% in 2021, to 8% in 2022, and to 8.2% in 2023. These figures however should be
viewed with caution - see Notes below.
• Figure 21b shows that in 2020 there were 27,500 of NLs working age population with no formal
qualifications.  This restricts their ability to access current or developing employment opportunities.  This
has fluctuated since with the latest figure showing as 30,100. These figures however should be viewed with
caution - see Notes below.
Data sourced from the Census
• Given the undernoted caveat regarding the data for this measure, some additional context can be provided
through the recent Census results for which data has been captured in respect of the percentage of the
population with the highest level of qualifications, although it should be noted that Census data is only
available every 10 years, and it reflects a moment in time.
• Figure 21c shows the proportion of NLs population with no formal qualifications as at the 2022 Census was
21.0% - a decrease from 33% in 2011 and 39.9% in 2001.
14
link to contents page
Notes:
Since the significant change in the NL figures in 2021, the data has been queried with the Office of
National Statistics (ONS) and following an announcement in October 2024 the following should be noted:
• Following recent challenges in operating the Annual Population Survey (from which this qualifications
measure is derived), the ONS have carried out an assessment of the quality of the survey. While they
consider the quality of the Annual Population Survey to be robust for national and headline regional
estimates, there are concerns with the quality of estimates for smaller segments of the population, such
as local authority geographies. In addition, a review and update is needed for the weighting approach
used in the Annual Population Survey which has not been updated in line with Labour Force survey and
is therefore less representative of the current population.
• At present therefore ONS outputs produced using Annual Population Survey data should be viewed
with caution as they are officially labelled as statistics in development.
Page 90 of 290

Page 91

C14: School exclusion rate per 1,000 pupils - all children
Measuring this indicator will tell us if we have:  Reduced the number of children not in education.
What success looks like:  No child in NL is excluded from education.
The latest North Lanarkshire commentary:
• NL schools have seen a positive decrease in exclusion rates over the period of the reported
data from 46.6 per 1,000 pupils in 2010-11 to 11.6 per 1,000 pupils in 2022-23. 
• The latest figures reflect the lowest rate for NL over the reported data and are lower than both
the national average (16.6) and family group average (17.9).
• Over the period of The Plan for North Lanarkshire overall exclusion rates have improved in NL
by 67% from 35.1 per 1,000 pupils in 2016-17 to 11.6 in 2022-23.
• This is a significant improvement in NL compared to lower improvements over this same period
in both the national average (38%) and the family group average (39%).
C15: School exclusion rate per 1,000 pupils - looked after children
Measuring this indicator will tell us if we have:  Reduced the number of NLs most vulnerable
children and young people not in education.
What success looks like:  No child looked after in NL is excluded from education.
The latest North Lanarkshire commentary:
• NL schools have seen a positive decrease in exclusion rates for looked after children over
the period of the reported data from 451.8 per 1,000 pupils in 2010-11 to 26.7 per 1,000
pupils in 2022-23.
• The latest figures reflect the lowest rate for NL over the reported data and are lower than
both the national average (96.9) and the family group average (100.2) .
• Over the period of The Plan for North Lanarkshire exclusion rates for looked after children
have improved by almost 92% from 317.9 per 1,000 pupils in 2016-17 to 26.7 in 2022-23.
• This is a significant improvement in NL compared to lower improvements over the same
period in both the national average (54%) and the family group average (54%).
• Exclusion rates for looked after children in are now the 6th lowest of all 32 local authorities
in Scotland.
Notes:
• This measures the number of exclusion cases per 1,000 pupils, this includes both primary
and secondary school pupils.  It is the number of exclusion cases that is measured - as
pupils can be excluded more than once per year which means a single pupil may be
counted more than once in the figures. Exclusions include both temporary exclusions and
pupils removed from the register.
• The school year covered by 2020/21 exclusion statistics was impacted by the pandemic
and at source it is therefore reported that some of the decrease from 2018/19 to 2020/21
can be attributed to the pandemic.
• This data is only published every two years.
Notes:
• This measures the number of exclusion cases per 1,000 pupils who are looked after at a
publicly-funded or grant-aided mainstream schools.  It does not include grant-aided special
schools or independent schools.  It is the number of exclusion cases is measured - as
pupils can be excluded more than once per year which means a single pupil may be
counted more than once in the figures.
• The calculation for this indicator has changed in previous years and all figures have been
re-baselined; this means it is now comparable with overall exclusion rates (i.e. indicator
C14).
• This data is only published every two years.
15
link to contents page
Page 91 of 290

Page 92

Notes:
• The data in Figure 22a which looks at poverty levels after housing costs is not available at a level below North Lanarkshire, therefore the data depicted in Figures 22b, 22c, 22d, 22e is obtained from a
different source and looks at children living in relative low-income households before housing costs.
• A family must have claimed child benefit and at least one other household benefit at any point in the year to be classed as low income using the data in Figure 22b.
C22: Poverty - % of children in poverty after housing costs
The latest North Lanarkshire commentary:
% of children in poverty after housing costs
• With the vision of inclusive growth and prosperity for all in The Plan for North Lanarkshire, this indicator is of particular relevance to ensure that all of NLs children get the best start in life.
• Significant improvements were noted in the proportion of children in poverty over the initial period of The Plan for North Lanarkshire - from a baseline of 25.2% in 2016/17 to 23.2% in 2020/21 (Figure 22a). 
Following the pandemic, figures increased to 26.6% in 2021/22 and to 26.9% in 2022/23; the trend in NL in this respect followed both the national and family group trends.
• This means there remains almost one in four children in NL living in poverty - higher than the national average of just over one in five children.
% of children living in relative low income households before housing costs
• There are a broad range of factors contributing to child poverty locally and of concern is the disparity across wards in NL. According to HMRC data (see Figure 22b) the number of children aged 0 -15 in
NL living in relative low-income families has increased from 12,148 to 14,768 over the period of The Plan for North Lanarkshire.
• Figure 22c shows the range across North Lanarkshire as at The Plan for North Lanarkshire baseline, with Figure 22 showing the latest position and Figure 22c the percentage point difference between the
data in Figure 22c compared to Figure 22d.
• Figure 22e shows the biggest change over time in Cumbernauld East, Bellshill, Motherwell West, and Wishaw.
Measuring this indicator will tell us if we have:  Reduced the number of NLs children and their families living in poverty.
What success looks like:  No child in NL experiences disadvantages because of poverty.
16
link to contents page
Page 92 of 290

Page 93

C10: Child wellbeing - % of children reviewed at 27 to 30 months with no concerns recorded
Measuring this indicator will tell us if we have:  Improved the wellbeing of NLs youngest children.
What success looks like:  The majority of NLs babies get the best start in life and where issues occur, they
are addressed at the earliest opportunity.
The latest North Lanarkshire commentary:
• Figure 10a shows there are 79.6% of children in NL who have no concerns in
any domain at their 27-30 month review.  This is a slight increase in the
proportion with no concerns from 79.2% in the previous year.
• The latest figure for NL is lower than the national average (82.1%).
• The pattern for children with no concerns in any domain remains less than the
highest level recorded in 2017/18 (83.7%), and lower than The Plan for North
Lanarkshire baseline of 81% (2016/17).
• Along with the slight increase in the proportion of no concerns recorded from
2021/22 to 2022/23 which is a positive improvement, there is a slight decrease
in the proportion where one or more concerns have been recorded which is
also a positive improvement.
• Figure 10b shows where one or more concerns have been recorded which has
decreased from 20.8% to 20.4% in NL; latterly this trend does not follow the
national picture where this has increased from 17.8% to 17.9%.
Notes:
• This indicator records the average number of concerns identified at the case
conferences / planning meetings of children who are on the child protection
register.  The pandemic led to changes in how reviews were delivered as well as
the circumstances of daily life for many children in 2020/21 and 2021/22.  It is
possible that both factors relating to assessment and recording, and genuine
changes in the occurrence of developmental problems, have contributed to the
increase in the data in 2021/22.
• Early identification of developmental issues is crucial to ensuring that children
reach their full potential.
17
link to contents page
Page 93 of 290

Page 94

Notes:
• These statistics are collected by Public Health Scotland and are derived from breastfeeding data
collected at routine child health reviews at around 10-14 days of age (the public health nurse / health
visitor first review), around 6 to 8 weeks of age and around 13-15 months and recorded on the Child
Health Systems Programme Pre-School system (CHSP Pre-School).  The number of children
eligible for review is defined as the number of children who turned the appropriate age (10 days for
first visit, 6 weeks for 6-8 week review, or 13 months for 13-15 month review) during the financial
year of interest and who were active on the Scottish Immunisation and Recall System (SIRS). 
Figures at the 6-8 week review and 13-15 month review are the overall rate, i.e. those babies
breastfed overall which includes mixed breast and formula.
• Breastfeeding is considered to provide the best nutrition for babies and young children. It supports
children’s health in the short and longer term, including through reduced risk of infections, and
benefits mothers’ health. Current guidance recommends that babies receive just breast milk for the
first 6 months of life, then, after introduction of solid foods, should continue to breastfeed up to at
least their second birthday.  There is evidence that interventions can work to improve breastfeeding
rates, e.g. ensuring good quality of breastfeeding support for mothers, influencing public attitudes to
breastfeeding, restricting the inappropriate promotion of formula milk, and ensuring supportive
employment policies.
C09: Breastfeeding - % of babies breastfed at 6-8 week review (overall rate)
Measuring this indicator will tell us if we have:  Improved the wellbeing of our youngest children
What success looks like:  The majority of NLs babies get the best start in life and where issues
occur, they are addressed at the earliest opportunity The latest North Lanarkshire commentary:
% of babies breastfed at 6-8 week review (overall)
• Figure 09a shows that NL has experienced a small year on year improvement in the proportion of
babies breastfed at the 6-8 week review, which had been on a par with the level of improvement seen
nationally.
• The latest figures show that 30% of babies in NL are breastfed at their 6-8 week review, getting the best
start in life; this is a significant  improvement from The Plan for North Lanarkshire baseline of 23.1% in
2017/18.
• This shows an improvement in babies in NL who are not breastfed at their 6-8 week review from 76.9%
to 70% over the period of The Plan for North Lanarkshire.
% of babies breastfed at the first review (around 10-14 days old)
• Figure 09b shows that NL has experienced a small year on year improvement in the proportion of
babies breastfed at the first review (around 10-14 days old), which had been on a par with the level of
improvement seen nationally.
• The latest figures show that 50.7% of babies in NL are breastfed at the first review (around 10-14 days
old), compared to a national average of 67.8%.  Figures at a local authority level are not available
earlier than 2019/20 for this measure.
% of babies breastfed at 13-15 month review (overall)
• Figure 09c shows that NL has experienced a small year on year improvement in the proportion of
babies breastfed at the 13-15 month review, which had been on a par with the level of improvement
seen nationally.
• The latest figures show that 15.9% of babies in NL are breastfed at the 13-15 month review (compared
to a national average of 21.4%).  Figures at a local authority level are not available earlier than 2019/20
for this measure.
Further analysis is required but the figures shows that half of all new babies are breastfeed at the first
review (around 10-14 days old), but the ability to sustain this can be shown to drop by time of the 6-8
week review and by the time of the 13-15 month review.
18
link to contents page
Page 94 of 290

Page 95

C23: Life expectancy at birth - estimates (males and females)
Measuring this indicator will tell us if we have:  Improved the life expectancy of NLs residents.
What success looks like:  More of NLs residents remain healthy for longer.
The latest North Lanarkshire commentary:
Life expectancy at birth - males:
• Latest life expectancy estimates for 2021-23 in NL are 74.9 for males (depicted in Figure 23a). 
This is the second increase in a row following two data series dips in 2018-20 and 2019-21
during the pandemic.
• Male life expectancy remains slightly lower than The Plan for North Lanarkshire baseline of 75.3.
• Life expectancy for males in NL had been following the national trend up to around the time of
The Plan for North Lanarkshire baseline at which time the gap compared to the national average
increased slightly.  The national average for life expectancy for males has increased from 76.5 to
76.8 in the latest figures.
Life expectancy at birth - females:
• Latest life expectancy estimates in NL remain at 78.7 for females (depicted in Figure 23b).  This
follows a dip in 2018-20 which has not recovered since.
• Female life expectancy remains slightly lower than The Plan for North Lanarkshire baseline of
79.4.
• Life expectancy for females in NL had been following the national trend up to around the time of
The Plan for North Lanarkshire baseline at which time the gap compared to the national average
increased slightly.  The national average for life expectancy for females has increased from 80.7
to 80.8 in the latest figures.
Healthy life expectancy - males:
• When considering the latest healthy life expectancy data (depicted in Figure 23c), the average
age of healthy life expectancy at birth is 54.3 for males in NL. This is lower than the previous
year (56.6) and lower than the latest national average (60.4).
Healthy life expectancy - females:
• When considering the latest healthy life expectancy data (depicted in Figure 23c), the average
age of healthy life expectancy at birth is 56.7 for females in NL. This is higher than the previous
year (55.5) but lower than the latest national average (61.1).
Notes:
• Life expectancy is the average number of years (at birth) that an individual is expected to live based on
current mortality rates.
• Healthy life expectancy data adds a quality-of-life dimension to estimates of life expectancy.  Healthy life
expectancy is the average number of years that an individual is expected to live in a state of self-assessed
good or very good health, based on current mortality rates and prevalence of good or very good health. 
Considering health life expectancy data therefore brings in aspects around health and care and the
importance of active and healthy lifestyles.
19
link to contents page
Page 95 of 290

Page 96

C24: Independent living - % of adults supported at
home who agreed that they are supported to live
as independently as possible
The latest North Lanarkshire commentary:
• C24: The results from the 2023/24 perception survey showed that 67.7% of people surveyed in NL agreed they were
supported to live independently.  The latest figures for 2023/24 show a decline in NL compared to the previous
survey in 2021/22 (79.8%), although the national picture also shows a show a decline in satisfaction from 78.8% to
72.4% over the same period.
• C25:  In 2023/24, 67.7% of people surveyed in NL agree that service and support improves their quality of life. The
latest figures for 2023/24 show a decline in NL compared to the previous survey in 2021/22 (77%), although the
national picture also shows a show a decline in satisfaction from 78.1% to 69.8% over the same period.
• C26: In 2023/24, the percentage of people in NL who agree they are supported to continue caring increased to
28.5% from 25.1% in the previous survey in 2021/22.  This mirrors the national picture where satisfaction has also
increased (from 29.7% to 31.2%) from the previous survey.
• It is expected that the 2021/22 results will reflect to some extent individual perceptions that were acquired during the
pandemic, making comparisons with this particular year less able to be compared on a similar basis.
Measuring these 2 indicators will tell us if we have:  Improved the independence and quality of life of NLs older residents.
What success looks like: NLs residents are supported as independently as possible for as long as possible.
C25: Quality of life - % of adults supported at home who
agree their services and support had an impact on
improving or maintaining their quality of life
C26: Carers - total combined % of carers who feel
supported to continue in their caring role
Measuring this indicator will tell us if we have:  Improved
support to NLs residents who care for others.
What success looks like:  NLs residents are supported as
independently as possible for as long as possible.
Notes:
• Data for these indicators comes from the Local Government Benchmarking Framework (LGBF) which uses a
subset of the national Health and Care Experience Survey which is undertaken every two years; 107,538 (out of
526,758) individuals registered with a GP practice in Scotland responded to the 2023/24 survey, giving an overall
response rate of 20%, a decrease from 24% in the 2021/22 survey.
- The survey asks about people's experiences (during the previous 12 months) of accessing and using
their GP practice and other local healthcare services; receiving care, support and help with everyday living; and
caring responsibilities.  The response rate in 2023/24 in NL was 18% (6,429 out of a sample of 36,443), a
decrease from 20% in the 2021/22 survey.
- Changes in the indicator calculations nationally in 2018 mean figures before this date are not necessarily
directly comparable with either 2019/20, 2021/22, or 2023/24 figures for all 3 indicators.
• As noted above, the figures used in this analysis are based on the LGBF data subset which is based on only
those respondents whose care was funded by the council or health board. This may differ from figures included in
the national report, which includes all respondents regardless of how their care is funded.
20
link to contents page
Page 96 of 290

Page 97

C06: Crime - % change in total recorded crime
Measuring this indicator will tell us if we have:  Reduced NLs recorded crime rates.
What success looks like:  NL experiencing a continued reduction in overall crime.
The latest North Lanarkshire commentary:
• Results from 2019/20 onwards had started to show a decreasing change in total recorded crime in North
Lanarkshire which was a more positive picture than nationally (Figure 6a).
• The latest results for 2023/24 in Figure 6a show an increase of 4% in total recorded crime from the previous year
compared to an increase of 3.6% nationally.
• The number of recorded crimes will have been impacted by the pandemic and this can be seen in Figure 6b,
with a decrease from 22,378 in 2019 to 21,734 in 2020/21 and 18,644 in 2021/22.  Figures for 2022/23 (18,751)
and 2023/24 (19,501) are positive in that they have not returned to pre-pandemic levels and remain lower than
The Plan for North Lanarkshire baseline (20,425).
• Figure 6c provides a breakdown of the crimes recorded by category with crimes of dishonesty remaining at the
highest level albeit showing reductions over the years.
21
link to contents page
Notes:
• Total recorded crime includes all crime recorded in six categories - damage and reckless behaviour, crimes of
dishonesty, crimes against society, sexual crimes, non-sexual crimes of violence, and coronavirus restrictions.
• Statistics on recorded crimes and offences provide a measure of volume of criminal activity which the police
face. This does not reveal the incidence of all crime committed as not all crimes are reported to the police. 
• The pandemic, and associated measures to limit social contact, had an impact on both the type and volume of
crime recorded between March 2020 and the lifting of final legal restrictions in April 2022.
Page 97 of 290

Page 98

C05: Household waste - % recycled
Measuring this indicator will tell us if we have:  Improved NLs waste recycling rates.
What success looks like:  Residents of NL actively reducing the amount of their household waste
going to landfill and increasing their recycling rates.
The  latest  North Lanarkshire commentary:
• The latest figures for the proportion of household waste that is recycled in NL, show
a significant increase to 46.7%.
• Over the period of The Plan for North Lanarkshire recycling rates in NL show
improvement from a baseline rate of 41.1% in 2016 to 46.7% in 2023.
• NLs recycling rates are now higher than the national average (43.5%) and the family
group of similar councils (40.4%).
• In 2023 NL saw an increase in tonnage recycled to 68,534 which is an increase of
3.5% over the period of The Plan for North Lanarkshire.
Notes:
• The family group comprises the eight most densely populated local authority areas
in Scotland (i.e. Aberdeen City, Dundee City, East Dunbartonshire, Edinburgh City,
Falkirk, Glasgow City, North Lanarkshire and West Dunbartonshire).
• National recycling targets are not statutory.
• This data is collected by SEPA which involves all 32 Scottish local authorities using
the web-based reporting tool WasteDataFlow.
• Recycling figures are calculated according to Scotland’s national recycling rate
methodology.  Over the years there have been changes to the methodology in terms
of what is counted as recycled, although these have been relatively minor and are
not expected to have any significant bearing on the reported figures.
• Following SEPAs verification process, figures are subject to slight changes; the
information presented here is the most up to date available as at the time of
producing this report.
22
link to contents page
Page 98 of 290

Page 99

C07: Rating of neighbourhood (includes all neighbourhoods) - % good / very
good ratings
Measuring this indicator will tell us if we have:  Improved NLs residents’ perceptions of their
neighbourhoods.
What success looks like:  Having neighbourhoods where people want to live is a fundamental
aspect of the shared ambition.
C08: Rating of neighbourhood as a place to live - % good / very good ratings (includes
only the 20% most deprived neighbourhoods, as defined by the Scottish Index of Multiple Deprivation)
Measuring this indicator will tell us if we have:  Improved the perceptions of NLs most disadvantaged
communities of the areas in which they live.
What success looks like:  Improvements to the most deprived neighbourhoods to ensure that residents
share equally in the improving picture and there is social inclusion across our diverse towns and
communities.
The latest North Lanarkshire commentary:
• Residents’ perceptions of their neighbourhood in NL in indicator C07 (see Figure 07a) have remained relatively stable with little change recorded over the years.  This mirrors the picture nationally.
• The latest results for NL show 93% rate their place to live as very good / fairly good (compared to a national average of 95%).
• A slight decline (from 90% who rated their neighbourhood as very good or fairly good to 88%) can be noted in ratings over the recorded data for neighbourhood as a place to live in the 20% most
deprived areas (see Figure 08a) compared to all neighbourhoods. 
• Conversely the national picture reverses this trend with an increase from 86% to 88% over the same period.  However, the national picture shows ratings generally to be the same or at a lower
level than NL over the time series.
• Both indicators show a decline immediately following the baseline of The Plan for North Lanarkshire, however both indicators almost show an increasing trend since and the latest results differ very
little to The Plan’s baseline.
Notes:
• This data is obtained from the Scottish Household Survey which is derived from a small sample of the population. 
• Due to the pandemic the survey methodology significantly differed to previous years, and therefore the results for 2020 and 2021 are not included in this analysis as the are not directly comparable
with other years.
• Results at a local authority level are not yet available from the 2024 Scottish Household Survey.
23
link to contents page
Page 99 of 290

Page 100

C04: Housing - estimated housing by tenure
Measuring this indicator will tell us if we have:  Increased the housing choice available to NLs existing and future residents
What success looks like:  Having a range of housing stock that meets population growth demands and also changes in household composition
The latest North Lanarkshire commentary:
Number of households
• In terms of overall households, there were an estimated 152,653 households in NL
in 2023 - which is an increase of 2% over the period of The Plan for North
Lanarkshire.
Housing tenure
• Figures 04a shows NLs housing by tenure, with the largest proportion being owner
occupied. In Figures 04a and 04b, the 2020 figures published have combined
owner occupied and private rented figures together - this explains the even larger
increase in the owner occupied figure in 2020.
• No new data has been published at local authority level since the 2020 update as
at March 2023.
• For this reason, the results from the 2022 Census in respect of the housing tenure
in NL is shown in Figure 04b, along with the corresponding data table.  This shows
63.2% of households are owned at 2022 compared to 54.2% at the 2001 Census. 
• Conversely social rented tenure has decreased to 27% at the 2022 Census
compared to 36% at the 2001 Census, while private rented has seen an increase
from 2.1% to 8.7% over the same period.
Housing projections
• While the population is expected to fall overall by 0.9% by 2043, household
numbers are projected to rise by 9%; this will mean increased demand for homes -
the table below provides more details in terms of household projections (from a
2018 base). 
• The number of individual households in North Lanarkshire are predicted to
increase by 5,720 new households by 2028 and by a further 4,720 from 2028 to
2043.
• More significantly, single adult households are projected to increase by 14%
(almost 7,240 people) by 2,043.  Similarly households with 2 adults are projected
to increase by 14.1% (+6,080) by 2043.
24
link to contents page
Page 100 of 290

Page 101

C03: Net migration - total rate per 1,000 population
Measuring this indicator will tell us if we have:  Increased NLs population and net inward migration.
What success looks like:  Steadily increasing population in NL, and in particular growth in the number of school age
children and the working age population.
The latest North Lanarkshire commentary:
• Inward migration in NL had generally been positive in recent years, with more
people moving into North Lanarkshire than moving out.
• The recent trend shows a change in this respect with a decrease from +2.46 per
1,000 population in 2020-21 to +1.61 in 2021-22, which although a decrease from
previous years it still shows growth in NLs population.
• Over the period of The Plan for North Lanarkshire migration growth has dropped
less significantly from +2.32 per 1,000 population to +1.61, an estimated decrease
of around 240 people.
• Historically the NL trend had mirrored that of the national average (which has
increased from +4.05 per 1,000 population to +8.96 in the recent publication, albeit
migration in NL has remained at a lower growth rate than the national average.
• The latest figures show a change in this respect - as while NLs trend shows a
decrease in population growth, the national picture shows an increase.
25
Notes:
• Net migration is the number of people coming into North Lanarkshire minus the
number of people leaving.
• Figures are published by National Records of Scotland and relate to total net
migration (difference between immigration and emigration). They include asylum
seekers and rounding adjustments. Refugees are also included from 2015-16
onwards. Migration estimates for 2012 to 2022 have been revised alongside the
mid-year population estimates following the 2022 Census in Scotland.
• Net migration is a general sign of a positive economic growth.
link to contents page
Page 101 of 290

Page 102

C01: Population projections - % change
The latest North Lanarkshire commentary:
• The NL population is projected to increase 0.3% from 2018 to 2028 (+990 people), compared to growth
of 1.8% in Scotland. The NL population is then projected to fall by a further -0.9% (-3,010 people) from
2028 to 2043. 
• The tables above show a detailed breakdown of the projected change in the population from 2018 to
2028 when growth remains favourable, and from 2018 to 2043 when growth is predicted to decline.
• Of note are changes that by 2043 will see a 7.6% reduction in the working age population and a 14.8%
reduction in children aged under 16, but a 39.6% increase in adults aged 65+.
• Within the aged 65+ age range, population projections expect to see a 16.2% increase in adults aged
65 to 74 and a 71.5% increase in adults aged 75+.
C02: Population - mid-year estimates (mye)
The latest North Lanarkshire commentary:
• NLs population has been growing since 2009.  The population as at The Plan for North
Lanarkshire baseline was 339,960; the latest mid year estimates published in October
2024 shows this has increased +0.6% to 341,890.
Measuring these 2 indicators will tell us if we have:  Increased NLs population and net inward migration.
What success looks like:  Steadily increasing population in NL, and in particular growth in the number of school age children and the working age population.
26
link to contents page
Notes: 
• The population projection tables above remain the most up to date available at a local authority level
at March 2025; these figures have not changed from the update at March 2024.
• Figures published nationally in January 2025 show projections re-baselined at a national level using
the 2022 Census data - this shows projections for Scotland to 2032 and 2047.  However, these
projections are not yet available at a local authority level, so no new populations projections are
available at a NL level and the most up to date available remain those noted in the tables above.
• Population projections to 2032 and 2047 at a local authority level are expected to be published in the
summer of 2025.
• In the meantime, a single updated figure is available from the 2022 Census results (published in
2024) which shows that NLs population increased from 337,727 at the previous Census in 2011 to
341,117 in 2022 - an increase of 3,390 (+1%).
Notes: 
• Mid year population estimates are currently under review nationally to reflect amended
data on long-term international migration for Scotland. As a result, Scotland’s current total
mid year population estimates - and future local authority level estimates - are subject to
change as the re-baselining exercise continues.
• This review is also expected to take account of the subtle changes in the estimate of
international migration and provide a more accurate account of inward migration of
individuals aged 16 and under.
• It is recognised that the publication of the 2022 Census results creates to some extent a
position where various figures can be used to depict NLs current and future population. It
is hoped that by the time the re-baselining of both the population projections (i.e. C01) and
the mid year estimates (i.e. C02) is complete that a clearer picture will be available to
inform future plans and priorities.
Page 102 of 290

Page 103

Appendix 3 
The Plan for North Lanarkshire: Delivering the Programme of work to 2028 - looking forward 
Outline of the ask for the Programme of Work mid-term review 
Note, it is accepted that as this review progresses the review group may identify other relevant information and points to add to the undernoted.  As such the purpose of setting the broad overview below is to ensure the review progresses within a broad set of principles and clear
requirements at the outset, while at the same time allowing appropriate flexibility to get the best possible outcome at the end of the review for the council and the people and communities of North Lanarkshire. 
Review 
context
The Plan for North Lanarkshire was established in 2019 with a very clear vision - inclusive growth and prosperity for all to bring equal benefits and a fairer distribution of wealth to all North Lanarkshire’s people and communities.  This vision is about
transforming the place that is North Lanarkshire. It’s about securing economic growth by enhancing local physical environments in a way that recognises the intrinsic social and health benefits gained in doing so. It’s about securing holistic ways of
working that integrate policies, services, and systems with only one solution in mind - to deliver a one council approach that targets the growing complexities in society to improve outcomes for the people and communities of North Lanarkshire.   
Approved by Policy and Strategy Committee in March 2023, the five year Programme of Work to 2028 set out the plans to deliver these improvements against seven priorities (i.e. transforming places, invest in North Lanarkshire, sustainable futures,
resilient people, brighter futures, digital North Lanarkshire, and one service). 
Review
purpose
The Plan for North Lanarkshire was founded on a place-based ambition to transform North Lanarkshire. Implementing place-based approaches originated from the need to address spatial concentrations of disadvantage which, in recent years, have
become further exacerbated by a growing complexity in problems being presented in terms of local health and social issues. As such, a place-based approach aims to target an entire community and tackle issues that exist at the neighbourhood level
(such as housing, employment, education, economic stability, and health, etc), and address fragmented service provision that leads to gaps or duplication of effort. Investing in place-based approaches and focusing on the physical environment of a
community, and on integrated and more accessible service systems, is considered to provide a holistic approach that crosses public sectors and silos and is real for people as it’s something an individual can identify with - a place to live, learn, work,
invest, and visit. 
The success of implementing a place-based approach though relies on both place-based and person-based policies crossing policy sectors and being developed and implemented in tandem. It relies on integration with wider investment and poverty
reduction strategies if it is to truly make a difference. The Delivery Plan for the Programme of Work to 2028 supports such an integrated and aligned approach and aims to further build on the significant achievements that have been realised through
the Programme of Work to date in terms of maximising the potential of North Lanarkshire as a place. 
However, such is the state of the nation (i.e. the wider national picture, the public sector reform agenda, and the local government environment) that the landscape within which the Programme of Work requires to be delivered has changed since The
Plan for North Lanarkshire was established.  In addition, the landscape isn’t just one that remains challenging, it is unpredictable, can be obstructive, and in danger of hampering (and undoing) the significant and positive inroads that the council has
made in working towards realising the vision of inclusive growth and prosperity for all and creating (and sustaining) a place with equal benefits and a fairer distribution of wealth for all North Lanarkshire’s people and communities. 
Even with around half of the 28 Health Check Indicators showing improvement over the period of The Plan for North Lanarkshire, there are many deep rooted, stubborn, complex, inter-connected, and inter-generational social, health, and economic
issues that remain in North Lanarkshire and that will not be resolved without a consistent and targeted one council approach to managing strategic change and delivering transformation, and ensuring the Programme of Work and its Delivery Plan remain
current, relevant, and deliverable.  Within this context there are also pockets of places across North Lanarkshire that are benefiting from economic growth more so than other areas which means the position remains fragile and therefore susceptible to
any wider (and uncontrollable) economical or environmental impacts on society.  This means that the Programme of Work needs to be able build resilience that can be sustained across all of North Lanarkshire. 
Therefore, with delivery of the Programme of Work to 2028 reaching its mid-way point, the aim of this review is to ensure that the council’s transformation programme remains current, relevant, and deliverable and set within the latest North
Lanarkshire context which is established through the 28 Health Check Indicators and wider bank of evidence.  It is also critical that the Programme of Work continues to be able to address the aforementioned deep rooted, stubborn, complex, inter-
connected, and inter-generational social, health, and economic issues and that the Programme of Work continues to be delivered in line with the one place, one plan, one council approach to ensure a greater focus on scale and purpose in order to
escalate significant place based transformational change across all local communities and deliver positive and sustainable change that improves the lives of the people and communities of North Lanarkshire.
Pre-requisites In identifying the key challenges, demands, and gaps in delivery that need to be addressed in the Programme of Work in order to escalate the transformation of North Lanarkshire, the review will consider the following (noting that this list is not
exhaustive):
• Progress and impact of delivering the Programme of Work to 2028 to date, including the impact of the related strategies, policies, and plans.
• The latest results and trends for each of the 28 Health Check Indicators.
• A wider bank of evidence that includes the recently published Census results as well as other appropriate North Lanarkshire data in respect of place and people.
• The current wider national context within which local government is operating, and future changes and impacts in this respect.
• The future state requirements (e.g. where we want to be) based on the evidence presented.
Review team Chief Officers in post since 2023/24, with input from subject matters experts and stakeholders across the council (including Elected Members). 
Timescale Outcome report to be submitted to Policy and Strategy Committee in cycle 4 of 2025. 
population, economy, regeneration health and wellbeing society, community, tackling poverty
The latest 
North
Lanarkshire
context
(Note this is only
an initial high-
level overview
and further data
will be provided
to support the
review process)
One of the most significant enablers to the success of The Plan for North
Lanarkshire is that North Lanarkshire maintains a balanced, growing, and
healthy population that is supported by net inward migration. Notwithstanding the
recent position nationally where the various population datasets are being re-
baselined in line with the 2022 Census, the data shows a clear shift in North
Lanarkshire’s population in terms of there now being more people age 65+ than
under 16 years old.  This is accompanied by migration levels which, while still
showing an increase, are showing growth at a lower level than the national
average.  If trends continue in this way, the impact of such demographical
change will erode the supporting working age resource base and increase the
Life expectancy in North Lanarkshire had been rising, but gains have started to
stall locally and nationally in recent years, albeit the average life expectancy for
males in North Lanarkshire has seen a small gain in the last two years.   
Healthy life expectancy (the average number of years that an individual is
expected to live in a state of self- assessed good or very good health, based on
current mortality rates and prevalence of good or very good health) for males
and females in North Lanarkshire remains below the national average. 
An aging population that combines lower life expectancy with lower healthy life
The 2022 Census shows that 21% of North Lanarkshire’s working age population
have no formal qualifications.  While this is an improvement from 33% at the
2011 Census and 39.9% as at the 2001 Census, this outcome still restricts the
ability of individuals to access current or developing employment opportunities. 
Educational attainment in terms of pupils gaining 5+ awards at level 6 continues
to improve in line with national trends. However, this indicator does not tell the
whole story, SCQF Level 6 provides a measure for those achieving at the highest
level in school, it does not provide a picture of those who have chosen other
pathways. For example, latest results show that 97.1% of all pupils in NL
Page 103 of 290

Page 104

dependency ratio (i.e. those aged under 16 + those of pension age -v- those of
working age).   
Economic growth is also key to realising The Plan for North Lanarkshire and
delivering inclusive growth and prosperity for all.  This means driving major
economic regeneration and growth and establishing North Lanarkshire as the
best location for businesses to set up roots, grow, and prosper.  With the most
ambitious house building programme in the country being delivered at pace,
community hubs being built in local areas that bring together education/ leisure
public sector services in the centre of local communities, and town centres plans
in motion to revive and sustain the local economy there have been many positive
changes evidenced through the 28 Health Check Indicators over the period of
The Plan for North Lanarkshire.  The latest results show that: 
• Growth in GVA per head has consistently remained positive and in line, or
above, the national trend, and recovery from the pandemic has been strong.
• The volume of new business start-ups continues to add to the North
Lanarkshire economy however, there remains improvements that can be
made to increase business sustainability in the longer-term.
• Wages continue to rise steadily for North Lanarkshire’s residents and while
the gap between male and female full-time and part-time workers continues
to decrease, these hourly rates remain lower than the national average.
• Self-employment rates have recently shown significant recovery following a
period of decline - the proportion of the working age population in self-
employment is now greater than pre-pandemic levels.
• While economically active rates in North Lanarkshire are showing signs of
improvement, there are still fluctuations in the data and economic inactivity
remains a concern, particular where the reason is due to long-term sick.
• Jobs density in North Lanarkshire is currently 0.64 jobs available within the
area (a job density of 1.0 would mean there is one job for every resident aged
16 to 64); 0.64 means there are 2 jobs for every 3 working age residents. 
As North Lanarkshire’s economic growth has remained positive for many years,
even during and in the aftermath of the pandemic there is much to build on to
increase the pace and scale to improve economic growth further.  Ideally located
at the centre of Scotland, North Lanarkshire is situated in a prime location to
realise the vision of The Plan for North Lanarkshire.  Well connected to the
transport network in terms of location on the main national rail network, situated
less than an hour away from three of Scotland’s international airports, with direct
links to three major motorways - and with 50% of marketable land within the
West of Scotland sitting in North Lanarkshire - the area is ideally placed in the
centre of Scotland to support a wide range of inward investment and business
development opportunities to secure economic growth locally. 
The mid-term review of the Programme of Work to 2028 will therefore include
due consideration of sustaining the transformation of North Lanarkshire as well
as ways to increase the pace and scale of regeneration to improve local
economic growth further, this includes increasing the new supply programme
target to create more options for housing across North Lanarkshire and
developing an approach to business and industry that supports significant
increases in inward investment along with the skills needed to fulfil demand
across a wider mix of industry sectors and sizes.
expectancy adds to the range of different and complex economic, social, and
health issues that exist at a local level. These issues present significant
challenges for the future shape and delivery of local public services and the
resources required to deliver them.  While older people may not necessarily
require formal support, as people live longer the evidence suggests that with
healthy life expectancy decreasing people are more likely to develop health
conditions which may become complex and, as a result, require a growing
reliance on one or more local services or supports. 
Results from the most recent health survey of local residents show
improvements in terms of local residents who agree they feel supported to
continue in their caring role. 
Improvements have also been significant in the proportion of babies breastfed at
the 6-8 week review which had been on a par with the level of improvement seen
nationally, albeit at a much lower rate.  As this rate appears to have stalled
recently, of concern now is the ability to sustain breastfeeding over time
compared to the initial rate recorded when the first review if undertaken around
10-14 day after birth. 
As reported in the latest Chief Social Work Officer annual report, recent years
have been particularly challenging given the pandemic and front facing and
priority nature of social work and care services which was followed by an impact
of the cost of living which added to the challenges through continuing demand
pressures, impacts on capacity, backlogs within wider systems, increased need,
and increased complexities. 
The mid-term review of the Programme of Work to 2028 will therefore include
due consideration of the transformational activity that is required to support more
of North Lanarkshire’s residents to remain healthy for longer, to break the cycle
of declining health, to support residents to be as independent as possible for as
long as possible, to increase life expectancy for residents, and to ensure the
majority of North Lanarkshire’s babies get the best start in life and where issues
occur in the social and care sector, they are addressed at the earliest
opportunity. 
This will also include due consideration of the changes in the local social care
provision given the changing demographic profile and increase in an elderly
population (and their housing requirements) and securing a whole system
approach within the place-based ambition set out in The Plan for North
Lanarkshire with community hubs being at the forefront of delivering whole family
support. 
achieved 1 or more awards as SCQF level 3 or above compared to a national
average of 97.8%.  This means that 2.8% (the converse) of all pupils in NL
achieved no passes at this level compared to a national average of 2.2%. 
Educational attainment in terms of pupils living in 20% most deprived areas
gaining 5+ awards at Level 6 continues to improve and is higher than the
national average.  The gap in this respect in North Lanarkshire now shows a
marked improvement in attainment for pupils living in the 20% most deprived
areas, compared to the overall student population. 
The proportion of young people leaving school in NL and entering a positive
destination continues to show a year-on-year improvement. However, there
remains at least 200 young people each year who do not, and these individuals
are generally the hardest to reach and engage with. 
After a period of improvement since The Plan for North Lanarkshire baseline,
child poverty rates have not been able to return to pre-pandemic levels. 
Research shows the extent to which the environment shapes the lives of children
who are born into households experiencing poverty and deprivation. It’s therefore
critical to tackle the barriers to growth by unlocking the potential in the most
deprived areas, breaking the cycle of poverty, and opening up opportunities to
create more equal communities. 
Following previous year’s figures which showed the change in recorded crime in
North Lanarkshire to be lower than the national average, this position has moved
with local rates reaching 4% compared to a national average of 3.6%. 
Notwithstanding the impact of the pandemic on the number of recorded crimes,
this remains a positive position in that the number of crimes in North Lanarkshire
recorded by the police has not returned to pre-pandemic levels and remains
lower than The Plan for North Lanarkshire baseline.  A breakdown of the crimes
recorded by category with crimes of dishonesty remaining at the highest level
over the years, albeit showing gradual reductions. 
The mid-term review of the Programme of Work to 2028 will therefore include
due consideration of creating neighbourhoods where people want to live as well
as neighbourhoods to ensure that residents share equally in the improving
picture and there is social inclusion across North Lanarkshire’s diverse towns
and urban and rural communities.   
This will also include due consideration in terms of ensuring every child leaving a
North Lanarkshire school is able to share equally in the improving economic
picture and achieve the pathway they wish to, how to further involve communities
in decision making, and designing, developing, delivering local services to
achieve co-production and community empowerment. 
Page 104 of 290

Page 105

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref KH/LJ Date 13/03/25 
Digital and IT Strategy 2024-27 update as at March 2025 
From  Katrina Hassell, Chief Officer (Business and Digital)  
E-mail HassellK@northlan.gov.uk Telephone 07903 096 121 
Executive Summary
Since 2019, the council has been actively delivering the vision for a Digital North Lanarkshire
to support the ambition set out in The Plan for North Lanarkshire, with proposals to achieve
Digital Communities, a Digital Economy, and a Digital Council providing the focus for activities.
To guide and support the drive for a Digital North Lanarkshire, a five-year Digital and IT
Strategy was established and approved in June 2019. This was subsequently kept under
review and regularly updated to ensure it remained current and relevant in the modern digital
world. 
With a new Programme of Work to 2028 and seven priorities for delivery approved in March
2023, the opportunity was taken to realign the Digital and IT Strategy accordingly to firmly
establish what it means to be digital, moving from ‘doing’ digital to ‘being’ digital, reaffirming
that digital delivery, and therefore the Council’s digital vision, is everyone’s business.
A three-year Digital and IT Strategy (‘the Strategy’) was therefore developed for 2024 to 2027
to provide a clear direction and ensure a common shared understanding of the journey that
needs to be taken to achieve a Digital North Lanarkshire. This also makes it clear how digital
will support delivery of the other six Programme of Work priorities and where resources need
to be targeted through a one council approach. 
Following approval of the Digital and IT Strategy for 2024 to 2027 at the Policy and Strategy
Committee in March 2024, it was also approved that “the Committee receive updates on
implementation of the Strategy on a six-monthly basis”. This report therefore follows on from
the six-monthly update considered by the Committee in September 2024 by providing a further
six-monthly update as at March 2025. 
Recommendations
It is recommended the Policy and Strategy Committee: 
(1) Acknowledge the six-monthly update as at March 2025 on the implementation of the
Digital and IT Strategy for 2024 to 2027 set out in this report, and
(2) Endorse the next steps outlined herein. 
The Plan for North Lanarkshire
Priority  All priorities
Item 5
Page 105 of 290

Page 106

1. Background 
1.1 As Members are aware the vision for a Digital North Lanarkshire, with investment
targeted in digital and technological solutions that will be of most benefit to the people
and communities of North Lanarkshire, aims to help realise inclusive growth and
prosperity for all in line with the council’s long-term ambition in The Plan for North
Lanarkshire. 
1.2 Digital North Lanarkshire is one of seven priorities within the Programme of Work for
2023 to 2028. Through the delivery of the Digital North Lanarkshire priority, Programme
of Work activities underway are focussing on developing a skilled digital workforce,
promoting an innovative sustainable culture, and providing digital leadership for an
evolving North Lanarkshire. 
1.3 In March 2024, Policy and Strategy Committee approved the Digital and IT Strategy for
2024 to 2027. The Strategy is key to providing the direction to deliver a Digital North
Lanarkshire which looks to build on successes achieved to date while embedding digital
thinking into everyday behaviours and actions to ultimately embrace a ‘digital first’
approach to service delivery. 
1.4 At the Policy and Strategy Committee in March 2024 a commitment was made to
ensure that the Digital and IT Strategy for 2024 to 2027 would be kept under review
during its lifecycle with an annual update of implementation progress reported to the
Policy and Strategy Committee. However, Elected Members requested that the strategy
be the subject of six-monthly reporting, with this report therefore representing the
second in a series of updates on the council’s progress in achieving the digital
aspirations set out in the Strategy 
2. Digital and IT Strategy for 2024 to 2027 
2.1 The council’s Programme of Work to 2028 sets out plans for a Digital North Lanarkshire
to increase the scale and pace of change and achieve coherence across all areas of
work. It represents the delivery arm of the Digital and IT Strategy, ensuring that focus
is retained on our Digital Communities, Digital Economy, and Digital Council
aspirations. 
2.2 For the Digital and IT Strategy, this means embedding digital thinking into everyday
delivery, embracing digital technology to do business significantly differently, and
always considering a digital-first approach. This requires a focus on skills, culture,
design, and empowerment of the workforce, all of which are being progressed through
the Digital North Lanarkshire Programme of Work themes. 
2.3 The Digital and IT Strategy recognises that technology can offer so many benefits for
the people and communities in North Lanarkshire - it can support people to live
independently in their own homes, it can enable seamless end to end processes to fulfil
requests for service, it can mean vulnerable people get more joined up help when it
really matters, it can provide a way to better use data to monitor and manage demand
and improve the delivery of services to the public. It is key to connecting people and
communities with place and improving their quality of life by providing access to new
opportunities, new ways of working, learning, and doing business, and new ways to
ensure quicker and easier access to essential care, supports, and services.
Ambition statement (18) Ensure our digital transformation is responsive to all people's
needs and enable access to the services they need
Programme of Work Digital North Lanarkshire
Page 106 of 290

Page 107

2.4 As such, the key points that shaped the development of the new Strategy are
summarised below:
• Ensuring a shared context and common shared understanding in terms of what it
means to be digital, what the Digital and IT Strategy aims to achieve and how, and
within what context is this to be delivered (i.e. the context within the council and
across North Lanarkshire and the wider local government environment).
• Having strategic principles in place to guide behaviours and actions and ensure
that being digital is everyone’s business. This includes establishing the business
and digital capabilities critical to the success of the Strategy.
• Making it real - firmly establishing what digital transformation actually means and
how it can make a difference to people’s lives and support the transformation of
North Lanarkshire’s communities. To do this, digital transformation must be seen
as the means to a clearly defined end; not the end in itself.
• Delivering digital solutions safely and securely, within an environment where rapid
technological advancements bring increased vulnerability to cybersecurity threats
and the need to prioritise digital security measures.
• Reiterating that communication, enabling transformation within existing resources,
and enhancing skills are critical to the successful deployment of the new Strategy.
As such, these are reflected in the Strategy itself in terms of the next steps and key
areas for delivery during 2024/25 through the supporting Digital North Lanarkshire
Programme of Work 
2.5 The extent of digital transformation that has been required to build the solid
technological foundations now being experienced should not be underestimated.
Establishing the foundations for North Lanarkshire’s digital vision represented a
significant shift in mindset and culture in terms of how the council conducts its business
and a greater emphasis on the public interacting and using council services through
digital methods. While this shift towards digital methods of working benefits people who
interact with the council most, it also enables council employees to work in a more
efficient and effective manner. 
2.6 A wide range of different stakeholders and groups are impacted by digital
transformational activity in striving to realise the vision for a Digital North Lanarkshire.
As such, enabling the people and communities of North Lanarkshire to thrive in a digital
world, while ensuring that no one is left behind, requires digital to be embedded at the
centre of the way the council operates. In practice this means that implementation of
the Digital and IT Strategy is underpinned by six principles designed to guide
behaviours and actions to ultimately ensure that being digital is everyone’s business
(as noted in paragraph 2.4 above). This means that people always come first regardless
of the activity being delivered, with several reports demonstrating this considered by
relevant service committees throughout the year. 
2.7 In recognising Policy and Strategy Committee’s remit to oversee the delivery of the
Council’s transformational and digitisation programmes and projects, progress against
the six Digital and IT Strategy principles for the period ending in March 2025 is
summarised below, with further details available within Appendix two. 
1. Employees first
The council is committed to developing its staff and creating opportunities to attract
and retain talent identified through workforce plans. 
In practice this means: Employees will be equipped with the appropriate tools to
do their job and to adapt to changes in an increasingly fast changing digitally
Page 107 of 290

Page 108

enabled environment.
Achieved so far: Development and/or delivery of a wide range of tools and enabling
technologies to assist employees in efficiently managing their workloads and
meetings. These include:
• Development of streamlined Purchase to Pay system, creating efficiencies,
reducing the risk of errors and creating the foundation for the development of
e-invoicing.
• Iterative deployment of PowerBI dashboards which illustrate staffing
demographics at the touch of a button.
• Development of a Microsoft Teams Calls Etiquette to be adopted across the
organisation to further support achievement of a mature digital culture and
means of engagement.
• The Microsoft O365 suite continues to see adoption of native functionality
supporting efficiency in daily activities, functions such as MS Lists and Planner
are being used to aid individuals’ work planning and processes, whilst MS
Forms and Loop are supporting collaborative working.
• Enhancing ‘hybrid’ meeting and collaboration experience through deploying
‘neat’ board technology across the office estate. 
• Document management and sharing continues to function well with adoption of
practices sharing “links” to OneDrive, SharePoint are reducing emailing of
documents and further supporting collaborative working.
• Tentatively introducing AI support technologies, with basic CoPilot functionality
supported in the Edge Browser.
• Year-long pilot of enhanced email protective technology in place, which is
expected to reduce data loss risk to the organisation 
2. Digital first
Digital First approaches become mainstream across the organisation with digital
default, and hub-based access and services, replacing traditional channels. 
In practice this means: Embedding modern and innovative digital and technological
solutions that improve council and public interactions and provide a connected
digital experience. Council services are more efficient and face to face contact is
reduced in favour of digitised services. Digital platforms are used to reduce
demand and provide personalised end to end services to the public. 
Achieved so far: Appendix 2 highlights recent developments delivered in support
of achieving digital first. These include:
• Processes / services available for public interaction on the council website has
increased further from 50 at the last update to now include MOT / Taxi
compliance, roads and streetlighting reports and requests, waste service
requests, traffic signal reports, and the ability to apply and pay for permits and
business grant applications online.
• Chat bot functionality went live on the council’s website in October 2024 to
enable residents to receive automated responses or to chat to an advisor.  Up
to 5 December 2024 7960 engaged sessions have taken place with 70% of
these being resolved by the Chat bot.
• Enhancements deployed for the Waste Services app
• Further development of the Complaints and Enquiries app
• Development of proof of concept for Crisis grants on-line. 
• Tendering for paperless office functions of corporate scanning and shredding
contracts 
Page 108 of 290

Page 109

3. Inclusive
Digital exclusion is less of a concern. 
In practice this means: People, businesses, and communities need to have the
means to thrive online and be able to work, learn, access information and services,
and connect with other people and organisations every day. They need to be
consulted with when it comes to significant transformations that are being made to
the services they rely on, and they need efficient ways to access council services
and get what they need at the first point of contact. The focus will remain steadfast
on the outcomes that require to be achieved from the user’s perspective,
recognising that the pandemic had exacerbated digital exclusion and increased the
need for the council to identify and address barriers and inequalities to make sure
that no one is left behind. This means the council will continue to ensure that
activities undertaken understand the needs of those experiencing digital exclusion
and there is a strategy put in place to ensure equity and access for all residents
and communities and groups with limited digital proficiency and access to in-
person navigation support and internet access. 
Achieved so far: Appendix 2 highlights recent developments delivered to support
digital inclusion. These include:
• Extension of Public Wi-Fi roll-out with over 80 locations now operational, with
over 42,000 individual registered users, averaging 14,000 connections per day
with a peak of 3,500 concurrent users
• A further 50 sites to come online over the coming 2 months
• Standing up of new digital zones within the Community Hubs at Buchanan
Centre and Chryston High School, with a mixture of online and face to face
consultation undertaken to understand the digital requirements of our residents,
partners and local organisations
• Four Immersive experience facilities now operational at Motherwell Library,
Summerlee Heritage Centre, Airdrie Library, and Muirfield Community Centre,
creating opportunities for services to facilitate for example, digital skills
development, health and wellbeing improvement, social skills development,
attainment of knowledge, and pathways to future learning and employment
• Continued delivery of the inter-generational project across the Council area –
most recently reported to the Communities Committee – to encourage residents
to see first hand where technology adoption can be beneficial and enriching 
4. Innovative
The council innovates with high functioning analytics for problem solving. 
In practice this means: Employees will make best use of digital tools and solutions
available to manage demand, enhance ways of working and productivity, and
optimise service delivery. Insights and evidence are essential to support informed
decision making and service planning. Data analytics and predictive algorithms
should be easy to access and to use every day to help identify, analyse, and
anticipate problems. 
Achieved so far: Appendix 2 highlights some of the recent innovative approaches
implemented. These include:
• Creation of on-line portal and change roadmap for Business Change to assist
with ideas, insights and a range of tools to help those leading, managing and
implementing change in their own areas.
• Smart lighting and Internet of Things (IoT) pilots deployed to Palacerigg and
Page 109 of 290

Page 110

Strathclyde Country Parks, incorporating CCTV and Public Wifi, these units are
fibre connected, house an IoT Gateway with remote sensors in place for traffic
/ people counting and water turbidity, with the intention to deploy ground
temperature sensors, bin-full monitors and additional people counters across
multiple pathways.  There is potential here to inform local park management
with empirical data on areas of usage that can be used to adapt service delivery.
• Iterative deployment of workforce analytics PowerBI dashboards providing
‘touch of a button’ insights to support service workforce planning and decision
making.
• Following the successful launch of the HR Service portal by ESC, progress
continues towards a single employee portal that will host IT and HR service
requests. 
5. Adaptable
The council’s technology, workforce, and public spaces are flexible and adaptable
to change. 
In practice this means: It is recognised that digitisation is underpinned by
technology that is evolving at an exponential rate of change and therefore the
council needs to actively seek opportunities to explore new and emergent
technologies that can help deliver improved care, supports, and services and
improve outcomes for the people and communities of North Lanarkshire. 
Achieved so far: Appendix 2 highlights recent developments to support this
principle. These include:
• Using 5G to deploy IoT (Internet of Things) sensors to circa. 40 properties as
part of a ‘smart and connected social places’ initiative and funded via Glasgow
City Region successful Dept of Science Innovation and Technology (DSIT) bid,
this innovative project aims to measure the effectiveness of Zero Carbon build
technologies whilst also developing understanding of residential energy and
environmental use within a home. Ultimately informing the organisation of the
most efficient ways to insulate and power homes.
• As highlighted in section three above, the use of public spaces is being adapted
to support communities to thrive online, with digital zones and immersive
experience pods now available in buildings across the authority area. 
6. Connected
The council is highly connected with other organisations. 
In practice this means: The council recognises that digitisation delivers better
benefits through collaborative approaches. This means the council is highly
networked with other organisations and collaborates at a community, local,
regional, and national level, and across the public, private, voluntary, and academic
sectors. 
Achieved so far: Appendix 2 highlights recent developments to support the
council’s drive to enhance connectivity. These include: 
• Continued participation in the Scotland-wide data agreement project.
• Collaborating with the Digital Office for Scotland on the development of the
Target Operating Model for the Digital ‘To Be’ State using the framework of
Workforce, Process, Information and Technology.
• Participating in the Glasgow City Region funded Connected region initiative,
mobile coverage sensors for the four main mobile networks have been deployed
Page 110 of 290

Page 111

to 10 lorries within our waste fleet, passing every property in North Lanarkshire
these sensors pass information on true signal strength and hence coverage to
a mapping solution, that will ultimately be made available via the Council to the
public on mobile coverage.   This also provide the Council invaluable information
when considering planning requests. 
Digital North Lanarkshire Programme of Work 
2.8 Delivery of the Digital and IT Strategy will be achieved through the Digital North
Lanarkshire Programme of Work to 2028. As members are aware, the Strategy and
related Programme of Work (PoW) contain 12 key deliverables and 45
projects/activities, with all categorised as: (a) Digital Culture, Leadership and
Knowledge; (b) Improved Customer Experience; (c) Digital First Operations or (d)
Performance Optimisation, as illustrated within Appendix 1. 
2.9 Throughout 2024/25 to date these deliverables and projects / activities have been
monitored through the Digital North Lanarkshire Programme of Work Strategic Board
via a corporate quarterly monitoring process; applied consistently across all seven
Programme of Work priorities. Such monitoring requires designated officers to consider
delivery against six dimensions (scope, cost / budget, quality, resources, risk, and within
time / on schedule), and to also advise of % completed status of each project / activity. 
2.10 An overview of progress against the 12 high-level deliverables, and therefore the
practical implementation of the Digital and IT Strategy to date, is set out in Appendix 2.
This is summarised below (note, calculations are based on the 45 actions in the delivery
plan). 
2.11 In terms of the overall completed status of the Digital North Lanarkshire Programme of 
Work:
• 98% of the 45 actions in the delivery plan supporting the 12 high level deliverables
have commenced to the initial stages, 2% are not yet due to start (this is an
increase from 94% as at June 2024). 
Of those commenced:
• 16% of delivery plan actions are complete or at the final closure stage (an increase
from 8% as at June 2024).
• 63% of delivery plan actions have reached the delivery and ongoing management
and monitoring stage.
• 7% have reached the planning and set up stage.
• 14% have reached the initiation stage. 
2.12 In terms of delivery within the six dimensions (i.e. scope, cost / budget, quality, 
resources, risk, and within time / on schedule): 
Of those commenced:
• 16% of delivery plan actions have been assigned a Blue RAG status.  
• 75% of the deliverables have been assigned a Green RAG status.
• 9% of the deliverables have been assigned an Amber RAG status; additional
commentary is included in the update provided in Appendix 2. 
Next steps 
2.13 The Digital and IT Strategy also recognises that achieving the vision for a Digital North
Page 111 of 290

Page 112

Lanarkshire is heavily dependent upon its key components and critical activities being
understood and accepted, and thereafter systematically deployed and implemented,
across all relevant areas of the council. As such, communication is critical to the
successful deployment of the approved Strategy and work to date in this respect
includes the following:
•  In recognising that digital albeit a key enabler for the entire Programme of Work, is
often perceived to be technical, the six-monthly report in September 2024 provided
a draft visual of a Strategy on a Page to highlight how digital capabilities can be used
to deliver services, care and supports to local communities as they move through
the ages and stages of their lives. This has since been developed further with
stakeholder engagement - including obtaining feedback from the Driving Digital
Locally subgroups – underway at time of writing.  
• The achievements and progress noted in this six-monthly update report will also be
shared with the Driving Digital Locally subgroups to ensure ongoing communication
and engagement as delivery of the Digital and IT Strategy progresses. 
2.14  Following the One Place One Plan governance report and changes to Chief Officer 
remits approved at the Policy and Strategy Committee in September 2024, work is 
underway to ensure a seamless transition of (i) technology solutions to Finance and 
Technology, (ii) business strategy to Strategic Communications and Engagement and
(iii) information security to legal and Democratic to ensure plans, integrations, and
supports are aligned accordingly, and appropriate connections maintained between the
new services to deliver on the Digital North Lanarkshire programme of work.  This
includes a review of the projects / activities supporting the key themes of a) Digital
Culture, Leadership and Knowledge; (b) Improved Customer Experience; (c) Digital
First Operations or (d) Performance Optimisation to ultimately ensure clear plans are
in place to move into 2025/26 without any disruption to delivering the priorities. 
2.15 In line with the motion approved by the Policy and Strategy Committee in March 2024,
the Committee will continue to receive updates on the implementation of the Strategy
on a six-monthly basis, unless advised otherwise. 
3. Measures of success 
3.1 Success with be measured through the delivery of the activities associated with the four
sub-groups of the Digital North Lanarkshire Programme of Work Strategic Board. 
4. Supporting documentation 
4.1 Appendix 1 - Roadmap to a Digital North Lanarkshire.
4.2 Appendix 2 - Summary of progress in delivering the Digital North Lanarkshire
Programme of Work 
Katrina Hassell
Chief Officer (Business and Digital) 
Page 112 of 290

Page 113

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
An Equality / Fairer Scotland Duty Impact Assessment was undertaken when
developing the Digital and IT Strategy 2024 to 2027. This assessment highlighted
key impacts may exist for older people, low-income groups, those with a disability,
and people who are homeless, asylum seekers or whose first language is
something other than English 
This strategy aims to place digital at the heart of what people do on a day-to-day
basis. There is a recognition that the needs of certain vulnerable groups require to
be considered throughout the journey to a digital environment. The strategy
ensures that no one is digitally excluded and there is an opportunity to improve
people’s lives by using digital solutions, technology, and skills. 
Given that deliverables aim to improve the connectivity and accessibility of North
Lanarkshire as a place, and the ability of local people and communities to gain the
skills and confidence required to help them benefit from the opportunities of being
digitally connected, the activities detailed throughout this report positively address
the impacts which were identified during the assessment. By placing people at the
centre of the strategy and the Driving Digital Locally digital subgroup continuing to
play its key role in enabling local communities to participate in designing and
deploying modern council services and ensuring that no one is left behind or
digitally excluded, this will ultimately have an impact to advance the general
equality duty to eliminate discrimination, improve equality of opportunity and foster
good relations to tackle a diverse range of issues and challenges. For example, the
work being carried out through the IPAD/intergenerational project has improved
elderly residents’ access to and understanding of technology within their
community. This alongside deployment of improved connectivity, Public Wi-Fi, and
Digital Community Services (the online mapping tool) all positively address the
impacts of digital exclusion within North Lanarkshire’s communities. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments/chief-executives-eqia/digital-and-it-
strategy-equality-impact-assessment 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Digital and IT Strategy recognises that change must be enabled within existing
financial resources, with work in support of this progressing through the
Performance Optimisation sub-theme. 
Page 113 of 290

Page 114

5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The Digital North Lanarkshire Programme of Work has collaboration and self-
service at the heart of its design principles, with all appropriately reflected within
both internal and external communications.
The Digital North Lanarkshire Programme of Work also envisages significant
changes to applications, software, hardware, and connectivity, with all duly
considered for security, compliance, Digital First, and Enterprise Architecture
perspectives through the key governance groups of the Enterprise Architecture
Governance Group (EAGG) and Data Governance Board (DGB). Paragraph 2.7
provides illustrative examples of digital changes being progressed.   
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☒ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Page 114 of 290

Page 115

Providing digital services that offer online, anytime access to services will have a
positive environmental impact across several important areas such as minimising
waste and recycling, thanks to the limited need for paper forms.
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Communications activities are detailed within the report.
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Effective identification and management of risk is considered critical to the success
of this programme, with all required processes strictly followed, and all high-level
risks and issues regularly reported to the Digital North Lanarkshire Programme of
Work Strategic Board.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
As noted in the report to Policy and Strategy Committee in March 2024, a
Children’s Rights and Wellbeing Impact Assessment was undertaken and the key
findings in this respect include that implementation of the Digital and IT Strategy
2024 to 2027 is considered to have an indirect impact as the strategy is not directly
aimed at children but will have an impact on them. In particular, article 2 (non-
discrimination) and article 23 (children with a disability). It is recognised that the
rights of the child, and the needs of certain groups, require to be considered
throughout the journey to a Digital North Lanarkshire. The Strategy aims to ensure
that no one is digitally excluded and there is opportunity to improve people’s lives
though digital technology, solutions, and skills. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☒ No ☐
Page 115 of 290

Page 116

APPENDIX 1
Roadmap to a Digital North Lanarkshire 
Page 116 of 290

Page 117

APPENDIX 2
Summary of progress in delivering the Digital North Lanarkshire Programme of Work 
Theme /
Programme
Deliverables (approved at Policy
and Strategy in September 2023)
start
date
end
date
Overall
delivery
RAG
assessment
Completed
status
Position as at March 2025
(including narrative where RAG status is Red or Amber)
Digital culture,
leadership,
and knowledge
Create a mature and sustainable
culture across the organisation to
ensure that digitisation of council
services provided to the public
successfully transition them to
achieve the outcomes specified
within The Plan for North
Lanarkshire. 
Sep-23 Dec-25 Green At delivery and
ongoing
management
and monitoring
stage.
• An overview of progress to date from the Digital Culture, Leadership
and Knowledge theme was reported to Finance and Resources
Committee in November 2024 (link).  This focussed on the digital
adoption work and the digital maturity assessment survey.
• Following on from the digital skills survey in 2021, the results of the
2023/24 survey examined digital adoption across services,
(particularly the use of M365) and at various levels. This showed that:
- 70% understood the value of the digital workplace
- 41% found their work more interesting as a result of applying
digital tools 
- 73% actively supported change 
- 73% have participated in learning
- 52% didn't feel they have opportunities to decide what tools to use
for their jobs 
- 47% agreed with having opportunities to develop new skills and
show capability
- 76% agreed they found digital workplace tool useful in their jobs 
- 28% stated using the tools help them feel more valuable in their
job; 55% agreed that IT does support personal development
• Greater insight was also gained into the current thinking of
employees across services in relation to digital maturity where, from
an overall 16.1% response rate, 82% of respondents were positive
about the council’s readiness for change / digital adoption and
recognised the alignment of change and transformation with the
priorities set out in The Plan for North Lanarkshire.  There was also a
recognition that the tools available have enhanced team collaboration
as well as enhancing individual efficiency and productivity. Accessing
support for the adoption of new technologies, particularly those under
age 25, has been highlighted an area to be further investigated, as
well as further support that could be given to employees as part of the
digital culture change activities. 
• Having established a baseline measurement for digital adoption a
digital maturity assessment is under development to further help the
council to understand the current state of technology use and extent
of digital maturity, and to identify gaps in digital capabilities.  
Page 117 of 290

Page 118

APPENDIX 2
Theme /
Programme
Deliverables (approved at Policy
and Strategy in September 2023)
start
date
end
date
Overall
delivery
RAG
assessment
Completed
status
Position as at March 2025
(including narrative where RAG status is Red or Amber)
• Workshops have been held over the winter to develop the next steps
and agree a development plan, this includes a focus on engagement
and communication, digital champions / leaders, training and support,
competencies, and etiquette (for which a NL Announcement was
cascaded in January 2025 implementing a Microsoft Teams Calls
Etiquette to be adopted across the organisation).
Digital culture,
leadership,
and knowledge
Develop digital leaders to
facilitate behavioural change
required to enable service
transformation within existing
resources. 
Nov-23 Sept-25 Amber At planning
and set up
stage.
• Initial discussions have taken place on the specific programme
currently in existence and aligning this to the needs of a council wide
leadership programme to incorporate digital capabilities, including
cognitive transformation (thinking differently), behavioural
transformation (acting differently), and emotional transformation
(reacting differently).
• Research work continues to understand the future state requirements
for the organisation with digital leadership core competencies and
approaches. However, due to competing demands, approval of a has
moved the end date to September 2025 to enable a more in-depth
and co-ordinated approach; a subsequent risk review considered
there was no significant impact on the overall work plan in this
respect. Rescheduling of this work was addressed at aforementioned
workshops to create the development plan for digital culture,
leadership, and knowledge.  
Digital culture,
leadership,
and knowledge
Develop and deploy a self-
adapting redesign framework to
accelerate digital business
transformation of critical council
functions. 
Sep-23 Mar-24 Green At delivery and
ongoing
management
and monitoring
stage.
• Upon completion, the change management toolkit portal was
demonstrated at the Programme of Work Board in December 2024
prior to a formal training programme and launch for a council wide roll
out by the end of 2024/25.
Digital culture,
leadership,
and knowledge
Support development of a skilled
workforce to foster consistent
knowledge, improve digital
adoption, and accelerate digital-
first business capabilities.
Mar-24 Apr-26 Amber At planning
and set up
stage.
• Work has commenced on identifying the appropriate format for a
self-assessment tool to allow staff to understand their current
level of digital skills and undertake further learning, as
appropriate, to upskill the council's workforce to be more digitally
capable. 
• Modules on LearnNL are available to all staff and investment
continues in the flexible workforce development fund in digital
skills.
• The existing education programme has been shared and an
assessment of a test of change is now under consideration.
Page 118 of 290

Page 119

APPENDIX 2
Theme /
Programme
Deliverables (approved at Policy
and Strategy in September 2023)
start
date
end
date
Overall
delivery
RAG
assessment
Completed
status
Position as at March 2025
(including narrative where RAG status is Red or Amber)
• Other areas of activity at the initial stages include identifying
leadership capabilities and conclusion of the self-assessment. 
Both of these items have been discussed in line with the
development plan noted above.
Improved
customer
experience
Ensure a connected / integrated
digital experience to facilitate
users to transition to efficient
digital and hub-based services
and become empowered to be
self-managing and digitally
active. 
Apr-23 Dec-25 Green At delivery and
ongoing
management
and monitoring
stage.
• Chat bot functionality went live on the council’s website in October
2024 to enable residents to receive automated responses or to
chat to an advisor.
• Processes / services available for public interaction on the council
website now expanded to include MOT / Taxi compliance, roads
and streetlighting reports and requests, waste service requests,
traffic signal reports, and the ability to apply and pay for permits
and business grant applications online.
• Redevelopments of the customer relationship management
(CRM) system underway to enhance processes for staff to route
enquiries to the relevant service and improve cross service
working and thereby a one council approach.  Priorities are being
reprofiled to ensure all outstanding development work is
completed and the CRM Advisory Board and supporting action
plan have been refocussed to support delivery, monitoring, and
governance of the priority actions identified.
• The council’s purchase to pay system has been redesigned to
introduce a standardised approach that ensures a consistent way
of working across the council, maximises system integration
opportunities, removes / reduces paper based processes,
implements electronic invoicing and three-way matching, and
improves management information.  Purchase to Pay refers to the
end-to-end process in which goods and services are purchased
and ultimately paid for; this includes all steps from identifying the
need for goods and services through to paying a supplier.  Final
developments are underway in respect of training and awareness
sessions, completing all communications with Pecos users,
completing all configurations within Pecos, and developing plans
for a soft launch by the end of 2024/25
Page 119 of 290

Page 120

APPENDIX 2
Theme /
Programme
Deliverables (approved at Policy
and Strategy in September 2023)
start
date
end
date
Overall
delivery
RAG
assessment
Completed
status
Position as at March 2025
(including narrative where RAG status is Red or Amber)
Improved
customer
experience
Implement smart community
hubs to improve access to omni-
channel, digitally enabled
services, and experiences. 
Sep-23 Mar-26 Green At delivery and
ongoing
management
and monitoring
stage.
• Public consultation on the resources and services required in the
digital zone is now complete and data is being reviewed to
establish requirements within digital zones for individuals with
additional needs and integrate these into the digital zone offer.
• Next phase of the corporate booking system about to start with a
digital zones working group leading on integrating the corporate
booking system into the digital zone development. 
• Report submitted to Communities Committee in October 2024
(link) provided an update on immersive room developments and
the impacts.  Work to expand community use of immersive
experience pods and enhance digital experiences within a
community and beyond has now seen the fourth immersive room,
based in Airdrie library, is now completed and operational.
• Six monthly reports to the Communities Committee - in August
2024 (link) and February 2025 (link) - provide regular updates to
support wider public and stakeholder engagement.  This includes
information in respect of progress of the Driving Digital Locally
working group, the intergenerational projects which bring together
elderly residents and local primary schools, engagement for the
digital zones, the public Wi-Fi project, online chatbot tool, and
status of the new booking system implementation.
Improved
customer
experience
Ensure an accessible and single
source approach to data that
supports the organisation by
providing insights and evidence
that support decision making,
planning, delivery, and
continuous improvement as well
as public reporting and
transparency.
Oct-24 Dec-25 Green At planning
and set up
stage.
• This deliverable previously comprised four activities which were
reconfigured into one to ensure a more streamlined, focussed,
integrated, and value adding approach to data across the
organisation.  To date development work has scoped out the
purpose and content of the strategy and identified the relevant
existing component parts which require to be incorporated as well
as any gaps which require to be filled.  By developing a single
Data Strategy with a single approach to data, this aims to set the
foundations in respect the council’s data practices in order to
unlock the potential of data and create meaningful insights that
support the council in managing services and delivering the
Programme of Work in line with The Plan for North Lanarkshire. 
This incorporates all related aspects of data, including
governance, quality, data maturity, spatial mapping, open data,
and supporting architecture and technology.
Page 120 of 290

Page 121

APPENDIX 2
Theme /
Programme
Deliverables (approved at Policy
and Strategy in September 2023)
start
date
end
date
Overall
delivery
RAG
assessment
Completed
status
Position as at March 2025
(including narrative where RAG status is Red or Amber)
Digital first
operations
Ensure useful, secure,
compliant, and digital first
applications are available to
support critical but streamlined
service delivery. 
Jan-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• In September 2024, Policy and Strategy Committee considered
the new Automation and Generative Artificial Intelligence (GenAI)
Framework (link).  This sets out the council’s AI vision for
deploying the technology in an efficient and effective manner to
support implementation of the AI vision through new digital
service delivery models and solutions designed to meet the needs
of modern businesses and communities.  Next steps
developments are underway to develop a plan to identify
opportunities for AI functions and deliver the framework.
• Contract award for a new housing and asset management system
- to improve data management, monitoring, and service delivery
across housing - approved at committee in November 2024.  Next
steps developments and finalisation of the implementation plan is
now underway.  
• New case management and scheduling systems - to meet
statutory obligations and to improve service delivery and
performance management across social care – is progressing
with staff training now complete and plans in the final stages to
implement the first phase of Mosaic before the end of 2024/25.  
• Implement a leisure and facilities booking systems, including
integration with hub place bookings and introduction of compliant
and secure payment facilities that accommodate home and agile
working arrangements are progressing with a contract in place
and initial supplier meetings held.  Services have been migrated
to latest version of cloud system with rollout of new pay terminals
and installation of gated entry systems across a number of sites
underway.
• A report in respect of the asset management practices across the
organisation was submitted to the Finance and Resources
Committee in September 2024 (link).  This updated on progress in
respect of consolidating as many assets on to a single solution as
possible and reducing the number of business systems used
across the council to manage assets.  This also advised of the
next steps in respect of a review underway to drive forward the
consolidation of assets, both physical and technology (system)
related.
Page 121 of 290

Page 122

APPENDIX 2
Theme /
Programme
Deliverables (approved at Policy
and Strategy in September 2023)
start
date
end
date
Overall
delivery
RAG
assessment
Completed
status
Position as at March 2025
(including narrative where RAG status is Red or Amber)
• Implementation of a new cloud-based Microsoft Teams integrated
solution, incorporating virtual voice and digital assistant
functionality is underway in relation to the build and testing of a
new unified comms platform and migrations of 25 school sites.
Digital first
operations
Facilitate fibre-enabled
innovation to maximise the full
potential of Internet of Things
(IoT) and Artificial Intelligence
(AI) technologies in service
delivery. 
Apr-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• Implementation of procured Wide Area Network solution and
associated technical functionality (such as internet breakout
services and continued development and deployment of fibre
across North Lanarkshire) is ongoing in respect of corporate
requirements.  
• Around 80 sites are now live with a public wi-fi service, and the
roll out continues to migrate the remaining 50 sites into the
solution.  Implementation is however impacted by site surveys
and asbestos checks by the external contractor.
• Discussions are underway with legal and the supplier to develop
and implement a plan to enable internet access for temporary
accommodation properties.
• Work is also underway in respect of enhancing fibre availability
across North Lanarkshire to provide internet access to residents
with a strategy being drafted for options appraisal, with a report in
respect of this on today’s agenda.
• Smart Park schemes to gather data within park settings now
operational at Palacerigg Country Park and Strathclyde Country
Park with units active (and on renewables) and fibre connected
meaning that the data capture process is now underway to enable
an initial review from the sensors. 
• Immersive rooms now live at Airdrie Library, Motherwell Library,
Summerlee Museum, and Muirfield Community Centre with
services available to the public and partners.
• Work to create a digital infrastructure development toolkit and
associated processes to enable third party commercial
connectivity providers to deliver services across the council
involves discussions with Glascow City Council to investigate the
potential to re-use an existing process used in their infrastructure
model.
Page 122 of 290

Page 123

APPENDIX 2
Theme /
Programme
Deliverables (approved at Policy
and Strategy in September 2023)
start
date
end
date
Overall
delivery
RAG
assessment
Completed
status
Position as at March 2025
(including narrative where RAG status is Red or Amber)
Digital first
operations
Transition from using paper-
based storage to a digital
solution for retaining appropriate
council information.
Sep-23 Sep-25 Green At delivery and
ongoing
management
and monitoring
stage.
• Tender issued, responses received, and evaluation process
underway with a view to awarding the tender by the end of
2024/25.
Performance
optimisation
Develop an efficient digital and
IT cost model to ensure scarce
financial resources are aligned to
vital enabling technologies. 
Oct-23 Sep-26 Amber At delivery and
ongoing
management
and monitoring
stage.
• Work is progressing to identify digital and IT spend across the
council and develop a model to establish whether this is essential
and priority spend but this is a complex process as the council’s
environment sees hundreds of applications being used council-
wide, with detailed knowledge of individual items (users,
contractual basis) varying across services and ICT, particularly for
long-standing products purchased without ICT involvement.
Additional time is therefore necessary for data capture, as such is
critical for the analysis stage of this project.
• Baseline financial information has been sourced for matching with
Business Continuity / Disaster Recovery Plans and CMDB
(configuration management database) and work is underway to
capture non-financial information regarding individual products.
Expertise has been sought from Gartner to support next steps
development in terms of a model to identify priority products to
retain, as well as those to terminate or migrate.
• Work has progressed to develop and deploy structures and
processes that aid the identification and development of
operational innovation and that facilitates beneficial service
transformation in respect of developing supplier relationships. 
Funding re-profiled to ensure effectively used once business
cases begin to arrive, and eligibility criteria developed and
approved.  Further details, including information in respect of
promoting the Innovation Fund and associated application
process, are scheduled to be reported to committee in cycle 1 of
2025.
Performance
optimisation
Enhance security monitoring to
maintain effective access and
control over council data as the
Feb-24 Dec-27 Green At delivery and
ongoing
management
• To consider areas in relation to security that can be monitored in
terms of service delivery and to be able to assess performance
against these elements, a range of performance metrics have
been drafted and are in the final approval stages prior to
Page 123 of 290

Page 124

APPENDIX 2
Theme /
Programme
Deliverables (approved at Policy
and Strategy in September 2023)
start
date
end
date
Overall
delivery
RAG
assessment
Completed
status
Position as at March 2025
(including narrative where RAG status is Red or Amber)
council delivers the anticipated
increase in its digital footprint. 
and monitoring
stage.
implementing the supporting processes to ensure the metrics
reach appropriate audience at required intervals.
• Work is progressing to review data assets and solutions delivered
by or in conjunction with third party providers to ensure that
suppliers are consistently assessed and reported upon to enable
operational performance to be effectively managed throughout the
duration of any engagement and a supplier framework has been
drafted.  This will be finalised in line with the new Corporate
Procurement Supplier Framework scheduled to be launched
soon.
• Work to develop security standards continues to progress to
support existing cyber security controls.  This aims to support
processes to manage and secure council data and systems,
assess the risk associated with data loss, and create an
assessment model to provide meaningful, insightful, and simple
representation of the cyber rating of data control.  Recruitment is
under way for a temporary Senior ICT Security Officer post to
support the development of improved ICT technical vulnerability
management processes. 
Key to completed status
Key stages for the project / activity in the Programme of Work
Indicative %
completed
assessment
At initiation stage 
Project / activity still at proposal stage, and not yet approved by the relevant SRO / Chief Officer or approved to Project
Brief (or equivalent) stage or approved to Project Brief (or equivalent) stage, but still in development / at feasibility
stage.
>0% and <15%
At planning and set up
stage Project / activity approved to Project Business Case (or equivalent) stage / Project or Delivery Plan developed. >=15% and <25%
Page 124 of 290

Page 125

APPENDIX 2
Key to completed status
Key stages for the project / activity in the Programme of Work
Indicative %
completed
assessment
At delivery and
ongoing management
and monitoring stage
Project / activity underway and delivery is categorised as < =25% completed, or > 25% but < =50% completed, or >
50% but < =75% completed, or > 75% but < 100% completed. >=25% and <95%
Completed or at
closure stage Project / activity completed and closed off, or final evaluations, handovers, etc still to be undertaken. >=95% and =100% 
Key to RAG status
Blue Delivery is complete.
Green
Delivery is on track and in line with the six dimensions within which the project / activity is being delivered (i.e. scope, cost / budget,
quality, resources, risk, within time / on schedule) and the % completed status is as expected as at the time of the delivery
assessment.
Amber
Delivery is not on track and the latest assessment suggests there may be emerging issues with one or more of the six dimensions
within which the project / activity is being delivered (i.e. scope, cost / budget, quality, resources, risk, within time / on schedule)
and/or the % completed status is not as expected as at the time of the delivery assessment.
Red
Delivery is not on track and the latest assessment has reported issues with one or more of the six dimensions within which the
project / activity is being delivered (i.e. scope, cost / budget, quality, resources, risk, within time / on schedule) and/or the %
completed status is behind that which is expected as at the time of the delivery assessment.
Page 125 of 290

Page 126

Page 126 of 290

Page 127

North Lanarkshire Council
Report 
Does this report require to be approved? ☒ Yes  ☐ No
Ref KH/RB Date 13/03/25 
From Katrina Hassell Chief Officer (Business and Digital) 
E-mail hassellk@northlan.gov.uk Telephone 07903 096121 
Executive Summary
In setting its budget on 15 February 2024, the Council requested that the remaining Arms-length
External Organisations (ALEOs) – Fusion Assets Limited, Routes to Work Limited and North
Lanarkshire Properties LLP - be formally reviewed, with their contributions to the Council’s
strategic priorities and The Plan for North Lanarkshire, both now and in the future, assessed.
This report fulfils that request. It describes the adopted approach, review scope, levels of
Board/LLP engagement and assessment tools/techniques used to compare the existing
externalised service delivery models against the feasibility and benefits of delivering these
services using in-house resources.
Having compared potential benefits and level of strategic alignment for each option against its
feasibility, costs and risk factors, the Option Appraisal concludes that retaining all ALEOs (Option
1) is presently a better fit for the Council than in-house service delivery (Option 2).
The reviews highlighted areas for future development do exist, with several improvement actions
and a range of opportunities for individual ALEOs to explore therefore highlighted within the
detailed appendices accompanying this report.
All draft findings were shared with individual ALEOs in January 2025 to enable Director
consideration and comment. Feedback received is detailed within paragraph 2.11 of the report. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Acknowledge that each ALEO was assessed by a formal ALEO Review Board as
requested by Council on 15 February 2024.
(2) Consider the findings of the ALEO review, which recommend retention of all existing
externalised service delivery arrangements, subject to the following caveats: 
a. Fusion Assets Limited.
i. Provide a detailed action plan by 30 June 2025 to address the opportunities
and areas for future development detailed within Appendices 1(a) and 1(c).
ii. As identified through the SWOT analysis, there are opportunities to potentially
expand the scope of activity carried out by Fusion Assets to further contribute
to Council priorities. The Board of Directors is therefore requested to work with
Policy and Strategy Committee
Arms-Length External Organisations (ALEO) 2024 Review
Item 6
Page 127 of 290

Page 128

Council officers to develop a Business Case to explore opportunities to expand
activity in the future.
b. Routes to Work Limited
i. Provide a detailed action plan by 30 June 2025 to address the opportunities
and areas for future development detailed within Appendices 2(a) and 2(c).
c. North Lanarkshire Properties LLP
i. Provide a detailed action plan by 30 June 2025 to address the opportunities
and areas for future development detailed within Appendices 3(a) and 3(c).
ii. Given external advice received in respect of early termination of the LLP’s loan
facility illustrates that an advantageous (circa. £4.3m) net position is still
achievable up to October 2026; the Council may wish to re-examine these
findings following the drafting of its 2025/26 Annual Accounts.
iii. Work with Council officers to identify properties which create scope to facilitate
transformational change within town centres and communities, aligning
portfolio investments with the Council’s ‘Transforming Places’ vision and
Programme of Work.
(3)  Subject to acceptance and approval of the ALEO Review Board recommendations,
agrees to report these detailed ALEO Review findings to the respective Service
Committees to enable them to monitor the implementation of the detailed action plans. 
The Plan for North Lanarkshire
Priority All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
1. Background 
1.1 In setting its budget on 15 February 2024, the Council instructed a series of service reviews
be undertaken to ensure its remaining ALEOs (Fusion Assets Ltd, North Lanarkshire
Properties LLP and Routes to Work Ltd.) continue to effectively contribute to the delivery
of the Council’s strategic priorities and The Plan for North Lanarkshire. 
1.2 The Chief Officer (Business and Digital) established an ALEO Review Board in May 2024
to simultaneously progress all reviews. Business and Digital prepared standard assurance
toolkits, with such building upon the intensive review work previously undertaken between
2016 and 2019. The Legal Manager (Democratic and Resources) chaired the Board, with
client leads for individual ALEOs tasked with ensuring review activity was aligned to
standard assurance requirements. Representatives from Business and Digital, Financial
Solutions, People Resources and Legal and Democratic Services supported all review
activity, engaging with required specialists where necessary. 
1.3 The associated project plan confirmed review findings and associated recommendations
would be presented to this committee for consideration in March 2025. Review leads (or
agreed substitutes) formally advised individual ALEOs of the review scope, indicative
timelines, engagement milestones, and expected reporting. 
Page 128 of 290

Page 129

2. Report 
Scope of Reviews
2.1 In recognising this ALEO review had to examine whether external service delivery
remained the best option for the Council, review activity assessed ALEO performance
through the following lenses, with a red, red/amber, amber/green and green rating
mechanism consistently applied to evidence how well each ALEO satisfies expected
requirements: 
2.1.1 Objectives – level of deliverability, alignment with The Plan for NL and council strategic
priorities, supports best value and continuous improvement, clearly referenced in up-to-
date ALEO strategic documents. 
2.1.2 Governance – relevant Articles of Association, meeting arrangements, Board skills levels. 
2.1.3 Performance – success in achieving business objectives and key performance indicators
over medium term, status of previous ALEO review recommendations.
2.1.4 Financial – financially sound, level of reliance on Council resourcing, funding trends and
levels over medium term, level of financial commitments, efficiency measures and levels
of service investment. 
2.1.5 Service Delivery and Customer Satisfaction – service user accountability, customer
engagement, alignment with council expectations (now and in the future), ease of flexibility.
2.1.6 Benefits – of delivering services through ALEO mechanisms. 
2.1.7 Opportunities – what more can be done through ALEO versus potential delivery through
in-house mechanisms. 
2.1.8 Staffing – benefits and terms and conditions examined alongside establishments to (a)
understand whether sufficient skills, experience and expertise exist and (b) identify any
implications likely to arise should resource transfer into Council. 
2.1.9 Risk – effectiveness of management and ‘early warning’ arrangements. 
2.1.10 Environment Scanning – level of understanding of internal and external developments,
and potential impact on ALEO operations. 
2.1.11 Digital and Technological - assessing cost, feasibility and any security concerns
associated with transferring operations onto Council network and infrastructure. 
2.2 Evidence obtained through the assurance review was examined in line with the Council
instruction of 15th February 2024 (shown below) using SWOT (strengths, weaknesses,
opportunities, and threats) analysis techniques. Individual ALEO Boards were fully
engaged in completing the SWOT analysis, agreeing the RAG ratings allocated within the
assurance toolkits, and assisting Council Officers to uncover potential innovation, growth,
or service opportunities. 
OPTIONS
1
Is there evidence available to demonstrate that retaining existing
externalised service delivery remains the best option. 
2
Is it (1) feasible, and (2) beneficial for Fusion Assets Ltd./Routes to
Work Ltd/North Lanarkshire Property LLP services to be delivered
going forward by in-house NLC resources.
Page 129 of 290

Page 130

2.3 Using pre-determined assessment definitions, the effectiveness of these options was
assessed against the Council’s standard appraisal criteria of: 
a. Policy Fit – aligns with the vision in The Plan for North Lanarkshire
b. Cost/Savings – ensures cost effectiveness, and affordable and sustainable service
delivery.
c. Performance – maintains influence over service delivery and performance levels.
d. Risk – minimises future risk to the Council.
e. Feasibility of option under consideration 
2.4 A summary of the review findings and outcome of the option appraisals are detailed in
sections 2.5 through to 2.10 below. 
ALEO Review Findings
2.5 Each ALEO assessment covered between 52 and 57 key areas. Table 1 below summarises
the RAG ratings which were confirmed at engagement sessions held with individual ALEO
representatives on either 11th or 26th November 2024. 
Assessment Summary: Fusion
Assets
RtW NLP
Areas with a Green assessment: 50 45 45
Areas with a Green / Amber assessment: 2 12 7
Areas with an Amber / Red assessment: 0 0 2
Areas with a Red assessment: 0 0 3
Total areas assessed 52 57 57
Table 1 – RAG Summary 
2.6 Appendices one to three provide further details of how well each ALEO satisfied the areas
of assurance described in paragraph 2.1 above. 
Option Appraisal Outcome
2.7 Using the finalised SWOT analysis and agreed RAG summary, the ALEO Review Board
completed the Option Appraisal assessment on 9th December 2024. A summary of findings
is provided in Table 2 below, with further details in respect of individual ALEO option
appraisals presented as follows: 
a. Fusion Assets Ltd. – Appendix 1(b)
b. Routes to Work Ltd. – Appendix 2(b)
c. North Lanarkshire Properties LLP – Appendix 3(b)
2.8 Having compared potential benefits and level of strategic alignment for each option against
its feasibility, costs and risk factors, the Option Appraisal concludes that retaining all
ALEOs (Option 1) is presently a better fit for the Council than in-house service delivery
(Option 2). Final scores arising from each Option Appraisal are highlighted below:
Page 130 of 290

Page 131

ALEO
Option 1
Retain
externalised
delivery
(OA Score)
Option 2
Transition to in-
house service
delivery
(OA Score) 
Preferred
Option  Appendix
Fusion Assets Ltd. 176 114 Option 1 1 (b)
Routes to Work Ltd. 190 139 Option 1 2 (b)
North Lanarkshire
Properties LLP 132 105 Option 1 3 (b)
Table 2 – Option Appraisal Conclusions 
2.9 The reviews did highlight a need to address areas for future development, particularly within
North Lanarkshire Properties LLP, whose RAG summary evidenced action is urgently
needed in respect of strategic business planning, alignment with The Plan for North
Lanarkshire, customer engagement and workforce planning. High-level actions flowing
from the assessment of each ALEO are contained within Appendices 1 (c), 2 (c), and 3 (c)
for member consideration. 
2.10 The reviews also highlighted a range of opportunities should be further explored to ensure
that continued external delivery sufficiently evidences Best Value, alignment with The Plan
for North Lanarkshire and effective utilisation of all North Lanarkshire assets and
resources. Further details of key opportunities to explore are also highlighted within
Appendices 1 (c), 2 (c), and 3 (c). 
2.11 Following consideration of the draft findings by the Corporate Management Team on 19
December 2024, such was subsequently shared with individual ALEOs to enable Director
consideration and comment. The following feedback was received: 
(a) Fusion Assets Ltd.
Fusion Assets welcomed the review findings, subject to minor amendments being made to
the narrative contained within the draft option appraisal and review recommendation
summaries. The Council has actioned these requests wherever appropriate, with such
changes now incorporated into the details presented to the committee for consideration.
Fusion Assets also advised they would like a further opportunity to discuss the findings in
more detail. With a detailed action plan required by 30th June 2025, Council officers agreed
such would be worthwhile, with the Service Lead instructed to progress accordingly. 
(b) Routes to Work Ltd.
The review was very thorough and enabled RTW to demonstrate that it is governed and
managed with rigour, discipline and agility. Directors have been kept informed of the
process and it has been inclusive. Whilst it is acknowledged that there are some areas that
are not entirely ‘green’, these are largely related to well-known national challenges within
the ALEO’s funding landscape. 
Directors believe there is significant evidence available to demonstrate that retaining
Routes to Work Ltd. as an existing externalised service delivery is the best option and are
satisfied that the review has concluded with this recommendation. Directors are also
satisfied with the high-level improvement areas identified, some of which have already
progressed; the closer working relationship is also welcomed.
Page 131 of 290

Page 132

(c) North Lanarkshire Properties LLP
Representatives of the LLP confirmed the ALEO is satisfied with the overall review findings.
They agree that the scores for option 2 would have been very different had Council ‘buy
out’ of the existing loan been assessed as feasible and therefore acknowledge the Council
may look to reassess the feasibility of option 2 – transitioning to in-house delivery –
following the drafting of its 2025/26 Annual Accounts. 
3. Measures of success
3.1 Arms-length bodies continue to deliver high quality public services that achieve Best Value
for, and minimise risk to, the Council and its day-to-day operations. 
3.2 Timely implementation of agreed improvement actions and required Business Cases
demonstrating effective alignment to the Council’s strategic priorities and The Plan for
North Lanarkshire, both now and in the future. 
4. Supporting documentation 
4.1 Appendix 1(a): Review Findings Summary - Fusion Assets Limited
4.2 Appendix 1(b): Option Appraisal Scoring - Fusion Assets Limited
4.3 Appendix 1(c): Future development areas - Fusion Assets Limited
4.4 Appendix 2(a): Review Findings Summary – Routes to Work Limited
4.5 Appendix 2(b): Option Appraisal Scoring – Routes to Work Limited
4.6 Appendix 2(c): Future development areas – Routes to Work Limited
4.7 Appendix 3(a): Review Findings Summary – North Lanarkshire Properties LLP
4.8 Appendix 3(b): Option Appraisal Scoring - North Lanarkshire Properties LLP
4.9 Appendix 3(c): Future development areas - North Lanarkshire Properties LLP 
Katrina M Hassell
Chief Officer (Business and Digital) 
Page 132 of 290

Page 133

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer- 
scotla
Yes
nd-duty-impact
☐
-assessm
No
ents
☒
5.2 Financial impact   
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
Costs associated with completing the review (£0.040m) related to external legal advice
(Brodies) and North Lanarkshire Property LLP loan facility termination advice (Azets)
obtained to ensure that officer assessments – particularly regards feasibility of in-house
delivery - were thorough and fully informed.
There are no (new) ongoing financial implications arising from this report for the Council.
Financial arrangements were a key focus of the assessment, with officers from Financial
Solutions leading all considerations.
Lack of current resources to terminate North Lanarkshire Property LLP’s loan facility
largely resulted in Option 2 (deliver using in-house resources) for this ALEO failing to
satisfy the ‘feasibility’ strategic objective. Given external advice illustrates that an
advantageous (circa. £4.3m) net position is still achievable up to October 2026; the
Council may wish to re-examine these findings should its financial position change.
Appendices one to three describe the existing financial relationships between the
Council and the individual ALEOs, with all expected to continue with minimal variation.
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact   
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
There are no immediate HR implications arising from the report recommendations.
Staffing was a key focus of the assessment however, with officers from People
Resources examining existing structures (where such was provided and/or available) to:
(a) understand whether such facilitates the required levels of skills, experience, and
expertise, and
(b) identify potential implications of transferring existing employees to the Council and
a high-level comparison of those employees’ terms and conditions (where available).
Whilst Option 1 is presently a better fit for the Council, the ALEO Review Board have
identified areas for future consideration regarding the staffing structures and/or skills
levels of Fusion Assets Ltd and North Lanarkshire Properties LLP. These are highlighted
within the areas for future development of both organisations.
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Page 133 of 290

Page 134

5.4   Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes   ☒ No ☐
Legal and Democratic Services led the ALEO Review Board’s assessment of factors
such as Land and Buildings Transaction Tax (LBTT) and Fusion Assets Ltd joint venture
arrangements, with external support provided via Brodies.
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal data?
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
There are no immediate digital or technological implications arising from the report
recommendations, but such was a key focus of the review with officers from Business
and Digital examining each ALEO’s existing arrangements to identify any cost, feasibility
or security concerns likely to arise from transferring operations onto Council network
and infrastructure (option 2).
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)?
Yes ☐ No ☒
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
Page 134 of 290

Page 135

Risks associated with each option were assessed in line with the Council’s approved
Project Management (Option Appraisal) guidelines. Complexity of implementation and
confidence regarding ability to deliver on time, and to predicted benefits are amongst
the key criteria assessed. In directly comparing one option against another, ALEO
Review Board members consistently agreed that retaining external delivery (option 1)
was less risky than transferring delivery to in-house resources (option 2). This is
evidenced in the ‘risk scores’ presented within the option appraisal summaries provided
in Appendices 1(b), 2(b) and 3(b).
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service or
Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the Armed
Forces community to make sure that they do not face disadvantage compared to other
citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the age
of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from
the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 135 of 290

Page 136

Appendix 1(a)
Arms-Length External Organisation (ALEO) 2024 Review
Fusion Assets Ltd. – Summary Findings 
Introduction
1) In setting its budget on 15 February 2024, the Council instructed a series of service reviews
be undertaken to ensure its remaining ALEOs (Fusion Assets Ltd, North Lanarkshire
Properties LLP and Routes to Work Ltd.) continue to effectively contribute to the delivery
of the Council’s strategic priorities and The Plan for North Lanarkshire. 
2) The Chief Officer (Business and Digital) established an ALEO Review Board in May 2024
to simultaneously progress all reviews. Business and Digital prepared standard assurance
toolkits, with such building upon the intensive review work previously undertaken between
2016 and 2019. The Legal Manager (Democratic and Resources) chaired the Board, with
client leads for individual ALEO’s tasked with ensuring review activity was aligned to
standard assurance requirements. Representatives from Business and Digital, Financial
Solutions, People Resources and Legal and Democratic Services supported all review
activity, engaging with required specialists where necessary.
3) The associated project plan confirmed review findings and associated recommendations
would be presented to the Policy and Strategy Committee for consideration in March 2025.
Review leads (or agreed substitutes) formally advised individual ALEOs of the review
scope, indicative timelines, engagement milestones, and expected reporting. 
Scope of Reviews
4) In recognising this ALEO review had to examine whether external service delivery
remained the best option for the Council, review activity assessed ALEO performance
through the following lenses, with a red, red/amber, amber/green and green rating
mechanism consistently applied to evidence how well each ALEO satisfies expected
requirements: 
a. Objectives – level of deliverability, alignment with The Plan for NL and council
strategic priorities, supports best value and continuous improvement, clearly
referenced in up-to-date ALEO strategic documents. 
b. Governance – relevant Articles of Association, meeting arrangements, Board skills
levels. 
c. Performance – success in achieving business objectives and key performance
indicators over medium term, status of previous ALEO review recommendations. 
d. Financial – financially sound, level of reliance on Council resourcing, funding trends
and levels over medium term, level of financial commitments, efficiency measures
and levels of service investment. 
e. Service Delivery and Customer Satisfaction – service user accountability, customer
engagement, alignment with council expectations (now and in the future), ease of
flexibility. 
f. Benefits – of delivering services through ALEO mechanisms.
g. Opportunities – what more can be done through ALEO versus potential delivery
through in-house mechanisms.
Page 136 of 290

Page 137

Appendix 1(a)
Arms-Length External Organisation (ALEO) 2024 Review
Fusion Assets Ltd. – Summary Findings 
h. Staffing – benefits and terms and conditions examined alongside establishments to
(a) understand whether sufficient skills, experience and expertise exist and (b)
identify any implications likely to arise should resource transfer into Council.
i. Risk – effectiveness of management and ‘early warning’ arrangements. 
j. Environment Scanning – level of understanding of internal and external
developments, and potential impact on ALEO operations. 
k. Digital and Technological – assessing cost, feasibility and any security concerns
associated with transferring operations onto Council network and infrastructure. 
5) Evidence obtained through the assurance review was examined in line with the Council
instruction of 15th February 2024 (shown below) using SWOT (strengths, weaknesses,
opportunities, and threats) analysis techniques. Board members from Fusion Assets Ltd.
were fully engaged in completing the SWOT analysis, agreeing the RAG ratings allocated
within the assurance toolkits, and assisting Council Officers to uncover potential
innovation, growth, or service opportunities. 
OPTIONS Is there evidence available to demonstrate that retaining existing externalised
service delivery remains the best option. 
Is it (1) feasible, and (2) beneficial for Fusion Assets Ltd services to be
delivered going forward by in-house NLC resources. 
6) Using pre-determined assessment definitions, the effectiveness of these options was
assessed against the Council’s standard appraisal criteria of: 
a. Policy Fit – aligns with the vision in The Plan for North Lanarkshire
b. Cost/Savings – ensures cost effectiveness, and affordable and sustainable service
delivery. 
c. Performance – maintains influence over service delivery and performance levels. 
d. Risk – minimises future risk to the Council.
e. Feasibility of option under consideration 
7) A summary of the review findings and outcome of the option appraisal is detailed below. 
ALEO Review Findings
8) Fusion Asset Ltd.’s assessment covered fifty-two key areas. During an engagement
session held on 11 November 2024, the ALEO Review Board and Fusion Asset Ltd.’s
representatives confirmed the RAG ratings as follows: 
Assessment Summary: total
Areas with a Green assessment: 50
Areas with a Green / Amber assessment: 2
Areas with an Amber / Red assessment: 0
Areas with a Red assessment: 0
Page 137 of 290

Page 138

Appendix 1(a)
Arms-Length External Organisation (ALEO) 2024 Review
Fusion Assets Ltd. – Summary Findings 
9) Sections 10 to 20 below briefly illustrate how well the ALEO satisfies the areas of
assurance detailed in section 4 above. 
10) Objectives: (Green) Fusion Asset Ltd.’s objectives are closely aligned to the Plan for North
Lanarkshire, the associated Programmes of Work and the Economic Regeneration
Delivery Plan. Through ongoing governance, engagement and review, the Company’s
Articles of Association could be further explored to ensure strengthened alignment under
Option 1. 
11) Governance: (Green) Fusion Assets Ltd is properly constituted in terms of the Companies
Act requirements and takes appropriate advice and action on governance matters. Fusion
Assets Ltd has a strong, established and committed Board of Directors with experienced
non-Executive Directors. It can access funding and enter arrangements which may not be
available to the council under Option 2. It would be a potentially complex process to transfer
Fusion Assets Limited to the council. Under Option 2, the future of joint venture agreements
would require to be considered.
12) Performance: (Green) Fusion Assets Ltd continues to perform well. An economic impact
analysis by EKOS consultants in 2022 provided an independent long-term assessment of
Fusion Assets performance that is very positive. It highlighted net impacts to North
Lanarkshire’s economy of 580 Full-Time Equivalent jobs, £41m in ongoing Gross Value
Added and £19m in ongoing wages since Fusion Assets inception. Should the current
model be moved in-house, the impact achieved through current funding and joint venture
arrangements could be lost, with a negative impact on performance and the deliverability
of projects.
13) Financial: (12 Green, 1 Green/Amber) Under Option 1, there is no cost to the council and
the council receives £15K per annum income through the provision of financial services to
Fusion Assets Ltd. Transfer into the Council under Option 2 would result in costs to the
council and the inability of the funding model to continue in its current format as the future
of existing funding models and joint ventures would have to be considered. 
14) Service Delivery & Customer Satisfaction: (Green) Fusion Assets Ltd is accountable to its
Board, the Enterprise and Fair Work Committee, external auditors, joint venture partners
and tenants for its performance and service delivery. Customer satisfaction is high with
feedback from a low level of complaints being used to inform service delivery
improvements. 
15) Benefits: (Green) As outlined in both the 2022 EKOS evaluation report and the 2020
Industry Commission for Scotland report, Fusion’s model is particularly unique and
valuable to North Lanarkshire. Fusion Assets Business Plan to 2026 outlines the detail of
how the model delivers its services and the flexibility this affords the council. Elements of
Fusion Assets model cannot be delivered under Option 2. For example, North Lanarkshire
Council is not legally allowed to borrow to fund speculative commercial developments, and
the ability to continue existing joint ventures or to enter new joint ventures would be at risk.
16) Opportunities: (Green) Fusion Assets Ltd has a good industry reputation as highlighted in
the 2020 Infrastructure Commission for Scotland report and its ongoing ability to work with
new joint venture partners. Retaining Fusion Assets Ltd under Option 1 would allow joint
venture agreements to remain in place with their associated benefits. Legal advice would
be required regarding the future of these agreements should Fusion Assets become part
of the council. Through the Plan for North Lanarkshire, associated Programmes of Work
and the Economic Regeneration Delivery Plan, there are considerable opportunities for
Page 138 of 290

Page 139

Appendix 1(a)
Arms-Length External Organisation (ALEO) 2024 Review
Fusion Assets Ltd. – Summary Findings 
Fusion Assets Ltd to continue its current model and should additional funding and
resources become available, for it to (a) scale-up and deliver additional projects and their
resultant positive impact on the local economy notably land remediated and industrial
space developed with resultant private sector investment, Gross Value Added and jobs,
and/or (b) to explore opportunities to expand its focus beyond the industrial sector, working
more collaboratively with the council to deliver on its housing plans.
17) Staffing: (Incomplete) Fusion Assets Ltd has very low staffing levels, with a mix of
permanent and temporary employments. 
18) Risk: (5 Green, 1 Green/Amber) Under Option 1, there is no risk to the council given the
current robust governance arrangements. However, under Option 2, there are a number of
adverse risks including the loss of experienced directors and the significant risks
associated with the loss of access to alternative funding sources and the continuity of joint
venture arrangements. 
19) Environmental Scanning: (Green) There is the opportunity for Fusion Assets Ltd to scale
the delivery of projects if there are additional resources available to do so with the demand
for land and property remaining high in North Lanarkshire. There remains uncertainty over
future funding streams such as the Vacant and Derelict Land Fund. Option 1 enables
Fusion Assets Ltd to access funding streams and enter arrangements and joint ventures
which would not be available to the Council under Option 2. Ongoing market volatility in
relation to costs could impact the viability, pace and scale of delivery under both options
as could changes to legislation in areas such as empty property relief and the infrastructure
levy,
20) Digital and Technological: (Green) Fusion Assets uses North Lanarkshire Councils IT
systems, networks and servers. Their critical dependencies are dependent on the councils
Business Continuity and Disaster Recovery arrangements. 
Option Appraisal Outcome
21) Using the finalised SWOT analysis and agreed RAG summary, the ALEO Review Board
completed the Option Appraisal assessment on 9th December 2024. Fusion Assets Ltd.’s
assessment is attached at Appendix 1(b). Having compared potential benefits and level of
strategic alignment for each option against its feasibility, costs and risk factors, the Option
Appraisal concludes that retaining the ALEO (Option 1 -scores 176) is presently a
better fit for the Council than in-house service delivery (Option 2 – scores 114), with
Option 1 therefore recommended to elected members.
22) Whilst Option Two scores higher than Option One on the Policy Fit criteria, officers
determined that Option One is currently more likely to deliver against the cost/savings,
performance, risk, and feasibility requirements. 
23) Appendix 1(b) illustrates Option One is a better fit for the Council because:
a. Cost/Saving: Fusion Assets Ltd currently operates at no cost to North Lanarkshire
Council. Whilst there remains concern over the continuation of some future external
funding streams (e.g. Vacant and Derelict Land Fund), Option 2 is likely to bring
extra costs to the Council. These costs relate to company dissolution and potentially
TUPE and employee related costs. In addition, the council would be unable to enter
into the same finance and joint venture arrangements under Option 2 which could
lead to greater reliance on the council’s own capital funds. Fusion Assets Ltd under
Option 1 can continue with existing funding and Joint Venture arrangements.
Page 139 of 290

Page 140

Appendix 1(a)
Arms-Length External Organisation (ALEO) 2024 Review
Fusion Assets Ltd. – Summary Findings 
b. Performance: The ALEO’s legal structure facilitates good performance, with such
independently confirmed through economic impact analysis in recent years. Similar
structures and performance may not be achievable were services to transfer to in-
house delivery. 
c. Risk: Option 2 would place considerable risks on the current delivery model due to
the potential loss of expertise (e.g. Directors and staff) and result in the inability of
the Council to enter into the same finance and joint venture agreements that are
available under Option 1. This in turn would place pressure on internal resources
and funding with the further potential to delay the delivery and scale of projects.
Uncertainty as to future of joint venture agreements means option 1 is the less risky
option. 
d. Feasibility: Fusion Assets Ltd operates well in its current format and has
demonstrated value for money. Analysis during the review confirmed elements of
ALEO activity cannot be performed in-house, resulting in Option 2 being assessed
as not feasible to progress. It would be potentially complex to transfer Fusion
Assets to the Council. 
24) The review did highlight a need however to address areas for future development in Fusion
Asset Ltd.’s delivery arrangements, with the RAG summary above evidencing that
opportunities exist for strengthening alignment with The Plan for North Lanarkshire. In
addition, the need to increase resilience against the loss of expertise and knowledge has
been identified. 
25) The review also highlighted a range of opportunities should be further explored to ensure
Fusion Assets Ltd can take advantage of development opportunities as they arise to
support regeneration priorities and to continue to investigate funding opportunities and
innovative finance arrangements and mechanisms to maximise investment opportunities. 
Review Recommendations 
26) In taking all factors into account, the ALEO Review Board recommend that Fusion Assets
Ltd prepare an action plan to address the opportunities and areas for future development
outlined within this report, seeking approval from the Enterprise and Fair Work Committee,
which presently has oversight responsibility for this ALEO’s performance. 
27) The council should also continue to review the opportunities for strengthening alignment
of Fusion Assets Ltd to the council’s objectives, exploring innovative funding mechanisms
and external funding opportunities to support the continued delivery and scalability of
Fusion Assets Ltd. 
28) Request that, through a Business Case to the Council, Fusion Assets work with Council
officers to explore opportunities to expand its focus beyond the industrial sector, including
potentially delivery of mid-market housing.
Page 140 of 290

Page 141

Appendix 1(b)
Arms-Length External Organisation (ALEO) 2024 Review
Fusion Assets Ltd. – Option Appraisal Scoring
Page 141 of 290

Page 142

Appendix 1(c)
Arms-Length External Organisation (ALEO) 2024 Review
Fusion Assets Ltd. – Future development areas 
1. Address Staffing and Knowledge Risks
1.1. In conjunction with the Enterprise Manager, review resources and consider options to
increase capacity and resilience to ensure continuity/optimisation of current and future
service delivery and enable future expansion of activity.
1.2. Implement a formal knowledge management system to document expertise, workflows,
and critical processes. This ensures knowledge sharing and mitigates the risk of single
points of failure. Prepare a Business Continuity Plan around current staffing risks to
maintain operational continuity and to address potential staffing changes. 
2. Enhance Administrative and Operational Resource
2.1. Consider technology solutions to streamline operations and improve efficiency. 
3. Expansion of Service Offerings and Expertise
3.1. Consideration of broadening the range of development projects undertaken and diversify
project focus beyond the industrial sector including collaboration with North Lanarkshire
Council to identify priority areas and strategic opportunities in housing, retail, or mixed-
use developments beyond the industrial sector.
3.2. Conduct a feasibility study to identify high-priority areas for new development projects,
including underutilised or strategically significant properties.
3.3. Conduct a feasibility study to explore options for the provision of commercial property
consultancy services to other public sector organizations or local authorities lacking in-
house expertise.
3.4. Establish partnerships with local businesses, third-sector organisations, and North
Lanarkshire Properties LLP to leverage additional resources and expertise. 
4. Align more closely with Strategic Objectives
4.1. Review and update any memorandum of understanding or service-level agreement with
North Lanarkshire Council to define expectations, objectives, and key performance
indicators (KPIs) that ensure accountability.
4.2. Strengthen alignment with key NLC strategies, including The Plan for North Lanarkshire
and the Programmes of Work including Transforming Places and Invest NL.
4.3. Review current Performance Management Framework to ensure metrics reported clearly
demonstrate alignment with the Council’s priorities including ERDP, Transforming Places
Programme of Work.
4.4. Strengthen oversight and monitoring arrangements and ensure closer alignment with
North Lanarkshire Council’s strategic plan and programmes of work.
4.5. Collaborate with North Lanarkshire Properties LLP to define clear boundaries and roles
for commercial property rental activities. 
5. Amend Articles of Association for Broader Objectives
5.1. Initiate a review of the current Articles of Association to identify constraints and areas for
potential amendment.
Page 142 of 290

Page 143

Appendix 1(c)
Arms-Length External Organisation (ALEO) 2024 Review
Fusion Assets Ltd. – Future development areas 
6. Branding and Digital Presence
6.1. Finalise the update of Fusion’s website and branding, ensuring such reflect a
contemporary image that aligns with its objectives and appeals to stakeholders.
6.2. Develop a social media and digital communications strategy, leveraging platforms like
LinkedIn, Twitter, and Facebook to increase visibility, engagement, and stakeholder
awareness.
6.3. Allocate resources for regular content creation, such as case studies, success stories,
and updates, to keep stakeholders informed and involved.
Page 143 of 290

Page 144

Appendix 2(a)
Arms-Length External Organisation (ALEO) 2024 Review
Routes to Work Ltd. – Summary Findings 
Introduction 
1) In setting its budget on 15 February 2024, the Council instructed a series of service reviews
be undertaken to ensure its remaining ALEOs (Fusion Assets Ltd, North Lanarkshire
Properties LLP and Routes to Work Ltd.) continue to effectively contribute to the delivery
of the Council’s strategic priorities and The Plan for North Lanarkshire. 
2) The Chief Officer (Business and Digital) established an ALEO Review Board in May 2024
to simultaneously progress all reviews. Business and Digital prepared standard assurance
toolkits, with such building upon the intensive review work previously undertaken between
2016 and 2019. The Legal Manager (Democratic and Resources) chaired the Board, with
client leads for individual ALEO’s tasked with ensuring review activity was aligned to
standard assurance requirements. Representatives from Business and Digital, Financial
Solutions, People Resources and Legal and Democratic Services supported all review
activity, engaging with required specialists where necessary.
3) The associated project plan confirmed review findings and associated recommendations
would be presented to the Policy and Strategy Committee for consideration in March 2025.
Review leads (or agreed substitutes) formally advised individual ALEOs of the review
scope, indicative timelines, engagement milestones, and expected reporting.
Scope of Reviews 
4) In recognising this ALEO review had to examine whether external service delivery
remained the best option for the Council, review activity assessed ALEO performance
through the following lenses, with a red, red/amber, amber/green and green rating
mechanism consistently applied to evidence how well each ALEO satisfies expected
requirements:
a. Objectives – level of deliverability, alignment with The Plan for NL and council
strategic priorities, supports best value and continuous improvement, clearly
referenced in up-to-date ALEO strategic documents. 
b. Governance – relevant Articles of Association, meeting arrangements, Board skills
levels.
c. Performance – success in achieving business objectives and key performance
indicators over medium term, status of previous ALEO review recommendations. 
d. Financial – financially sound, level of reliance on Council resourcing, funding trends
and levels over medium term, level of financial commitments, efficiency measures
and levels of service investment. 
e. Service Delivery and Customer Satisfaction – service user accountability, customer
engagement, alignment with council expectations (now and in the future), ease of
flexibility. 
f. Benefits – of delivering services through ALEO mechanisms. 
g. Opportunities – what more can be done through ALEO versus potential delivery
through in-house mechanisms.
Page 144 of 290

Page 145

Appendix 2(a)
Arms-Length External Organisation (ALEO) 2024 Review
Routes to Work Ltd. – Summary Findings 
h. Staffing – benefits and terms and conditions examined alongside establishments to
(a) understand whether sufficient skills, experience and expertise exist and (b)
identify any implications likely to arise should resource transfer into Council. 
i. Risk – effectiveness of management and ‘early warning’ arrangements. 
j. Environment Scanning – level of understanding of internal and external
developments, and potential impact on ALEO operations. 
k. Digital and Technological – assessing cost, feasibility and any security concerns
associated with transferring operations onto Council network and infrastructure. 
5) Evidence obtained through the assurance review was examined in line with the Council
instruction of 15th February 2024 (shown below) using SWOT (strengths, weaknesses,
opportunities, and threats) analysis techniques. Board members from Routes to Work Ltd.
were fully engaged in completing the SWOT analysis, agreeing the RAG ratings allocated
within the assurance toolkits, and assisting Council Officers to uncover potential
innovation, growth, or service opportunities. 
OPTIONS Is there evidence available to demonstrate that retaining existing externalised
service delivery remains the best option. 
Is it (1) feasible, and (2) beneficial for Routes to Work Limited’s services to
be delivered going forward by in-house NLC resources. 
6) Using pre-determined assessment definitions, the effectiveness of these options was
assessed against the Council’s standard appraisal criteria of: 
a. Policy Fit – aligns with the vision in The Plan for North Lanarkshire. 
b. Cost/Savings – ensures cost effectiveness, and affordable and sustainable service
delivery.
c. Performance – maintains influence over service delivery and performance levels. 
d. Risk – minimises future risk to the Council. 
e. Feasibility of option under consideration. 
7) A summary of the review findings and outcome of the option appraisal is detailed below. 
ALEO Review Findings
8) Routes to Work Limited’s assessment covered fifty-seven key areas. During an
engagement session held on 11 November 2024, the ALEO Review Board and Routes to
Work Limited representatives confirmed the RAG ratings as follows: 
Assessment Summary: total
Areas with a Green assessment: 45
Areas with a Green / Amber assessment: 12
Areas with an Amber / Red assessment: 0
Areas with a Red assessment: 0
Page 145 of 290

Page 146

Appendix 2(a)
Arms-Length External Organisation (ALEO) 2024 Review
Routes to Work Ltd. – Summary Findings 
9) Sections 10 to 20 below briefly illustrate how well the ALEO satisfies the areas of
assurance detailed in section 4 above. 
10) Objectives: (Green) As an ALEO Routes to Work Ltd. continues to align its plans and
activities closely with The Plan for North Lanarkshire and The Programme of Work to 2028.
Its own Business Plan 2024-2027 also has objectives related to performance and service
development which demonstrate close operational working with Council services such as
Enterprise, Housing and Justice alongside other community planning partners. 
11) Governance: (Green) Routes to Work Ltd. is properly constituted in terms of Companies
and Charities legislation. It is a registered charity which has financial benefits not available
to the Council and can also access funding streams not directly available to the council. It
would be a potentially complex process to transfer Routes to Work to the council. Across
all measures of Governance, the organisation consistently adheres to the best possible
standards as both a company limited by guarantee and as a Scottish Charity and has an
excellent Board which has been recruited on the basis of its expertise and experience.
12) Performance: (5 Green, 2 Green/Amber) The ALEOs performance has been of a
consistently high standard though the change brought about in the labour market by the
challenges of 2020 have meant that it is still adjusting its programmes to the new
challenges. However, Routes to Work Ltd are not an outlier in this regard and all providers
of employability in Scotland have faced similar challenges. This has also coincided with
major changes to funding and the objectives set by external funders. There is no reason
to believe performance would improve if this was an in-house service.
13) Financial: (12 Green, 1 Green/Amber) There is complete transparency on all Routes to
Work finances with annual external audits alongside six-monthly oversight through the
Council finance team. There are established and robust arrangements for verification and
payment of invoices by the Council alongside checks on all expenditure to ensure
compliance with external funders. Value for money continues to be evidenced through the
regular and in-depth analysis of expenditure undertaken by Council finance and
employability teams. The Green/Amber relates to sustainability directly dependent on UK
and Scottish Government funding. 
14) Service Delivery & Customer Satisfaction: (4 Green, 4 Green/Amber) Active delivery is
evidenced across every council ward and community in North Lanarkshire and remains
highly regarded by its service users, local businesses and by organisations that it works
with in partnership; this was evidenced by the stakeholder consultation completed to inform
the creation of their 2024 - 2027 business plan. 25% of Routes to Work staff are ex- service
users and 75% of staff live in North Lanarkshire so the organisation is grounded within our
communities. The Green/Ambers relate to challenges with engagement; changing client
needs; and that there is more capability to work further with NLC Services such as
Education and Business Enterprise. 
15) Benefits: (Green) There is evidence that residents prefer to deal with an organisation
independent to the Council on employability issues which often require disclosure of
sensitive personal information. Routes to Work also carries its own distinctive brand, with
service users perceiving it to be wholly independent from the Council. However, it is also
appreciated for its strong links to Council services and good connections to third sector
organisations in North Lanarkshire, and in a way not available to mainstream Council
services. In addition, and because of the way the company is structured, the Council can
pass funding to the organisation the same as it would to any other department of the
Council. This has the benefit of demonstrating the Council is including the third sector
Page 146 of 290

Page 147

Appendix 2(a)
Arms-Length External Organisation (ALEO) 2024 Review
Routes to Work Ltd. – Summary Findings 
within its employability provision which is a factor that is considered a real positive when
the Scottish Government are issuing their employability grants. 
16) Opportunities: (Green/Amber) Within North Lanarkshire Routes to Work Ltd. are an
established brand and, have an excellent reputation for delivering on services underpinned
by their stated values within communities. If the ALEO was brought in-house this
perception of independence would cease and there would be less external funding going
to the third sector, which may lead to external funders challenging the model of provision
in North Lanarkshire. There is evidence that Routes to Work Ltd, as a small company, are
a more agile and flexible organisation in responding to change, as demonstrated by the
fast start and high performance during the delivery of the Glasgow City Region Working
Matters project.
17) Staffing: (Green) There would be higher costs in bringing the 90 Routes to Work staff into
the Council due to higher pension contributions, with a requirement to complete a job
evaluation process to assess and match levels of staff pay. There are other minor
differences in holiday entitlement which would have to be rationalised but given the
Council’s capacity and experience of undertaking such exercises staff could be integrated,
but such is envisaged to be at an initial significant cost.
18) Risk: (4 Green, 2 Green/Amber) Risk management is part of routine operations and
decision making of the ALEO, with sufficient resources available to maintain and monitor
risks across all levels of the organisation. The organisation adopts a proactive approach
to its risk management practices. Transition of the ALEO to in-house delivery would not
change the key risks associated with the delivery of externally funded employability
programmes in terms of performance or compliance with funding rules. 
19) Environmental Scanning: (2 Green/Amber) The nature of external funding to support
employability services is dependent on the UK and Scottish Government programmes and
is on an annual cycle. This would be the case whether Routes to Work retains its ALEO
status or is in-house. Routes to Work has recently secured new contracts outside of North
Lanarkshire and there is an ambition for these to grow in scale though at the moment they
are not significant enough to mitigate the annual funding challenge. 
20) Digital and Technological: (Green) RTW has an IT system/infrastructure which is entirely
independent of the NLC Network and have a robust Business Continuity plan in place.
There would be no advantage in bringing the ALEO in house in terms of its digital and
technological aspects, but there is also no significant costs or security concerns likely to
arise should in-sourcing be preferred. 
Option Appraisal Outcome
21) Using the finalised SWOT analysis and agreed RAG summary, the ALEO Review Board
completed the Option Appraisal assessment on 9th December 2024. Routes to Work
Limited’s assessment is attached at Appendix 2(b). Having compared potential benefits
and level of strategic alignment for each option against its feasibility, costs and risk factors,
the Option Appraisal concludes that retaining the ALEO (Option 1 -scores 190) is
presently a better fit for the Council than in-house service delivery (Option 2 – scores
139), with Option 1 therefore recommended to elected members.
22) Option One scores higher than Option Two on all Appraisal Criteria therefore the ALEO
Review Board determined that Option One is currently more likely to deliver against the
Council’s cost/savings, performance, risk, and feasibility requirements.
Page 147 of 290

Page 148

Appendix 2(a)
Arms-Length External Organisation (ALEO) 2024 Review
Routes to Work Ltd. – Summary Findings 
23) Appendix 2(b) illustrates Option One is a better fit for the Council because: 
a. Cost/Saving:
Routes to Work can, and has done so in some circumstances, source funding only
available to charities to provide services in accordance with Council policy. On other
issues there is no cost advantage to delivery in-house, there may be issues created by
the Council awarding external funding it accesses to itself and not demonstrably
sharing this with the third sector, with there also be a likelihood of potentially higher
longer-term costs arising from the TUPE transfer of the existing staffing pool. There are
no additional benefits identified in respect of Option 2 for this criterion. 
b. Performance:
Externalised delivery facilitates continuation of the established and focussed
performance management arrangements, which have routinely exceeded the
performance targets set by the Council. It would be challenging to retain such focus
under option 2 with wider / corporate council requirements also needing to be prioritised
for delivery. 
c. Risk:
No reduction in risk and possible increase in risk associated with performance meaning
that option 1 is the less risky option. 
d. Feasibility:
Routes to Work operates well. Potentially complex to transfer Routes to Work to the
council therefore Option 1 is more appropriate.
24) The review did highlight a need for Routes to Work Limited, within the RAG summary
above to continue to actively target alignment with The Plan for North Lanarkshire,
enhance its financial sustainability and target identified staffing issues. 
Review Recommendations 
25) In taking all factors into account, the ALEO Review Board recommend that Option 1 is the
appropriate choice for meeting the Council’s aims and objectives and that Routes to Work
Limited retains its ALEO status. 
26) The ALEO Review Board also recommend that Routes to Work Ltd prepare a detailed
improvement action plan to address the opportunities and areas for future development
described overleaf, seeking approval from the Enterprise and Fair Work Committee, which
presently has oversight responsibility for this ALEO’s performance.
Page 148 of 290

Page 149

Arms-Length External Organisation (ALEO) 2024 Review
Routes to Work Ltd. – Option Appraisal Scoring
Appendix 2(b) 
Option 1 - Retain As External Delivery  Option 2 - Transition to In-house Delivery 
Appraisal criteria
Overall
weighted
score for
this option 
Comments re Appraisal/Assessment 
Overall
weighted
score for
this option 
Comments re Appraisal/Assessment 
1. Policy fit - Aligns with the vision in The Plan for North
Lanarkshire (i.e. supports the council to deliver inclusive growth
and prosperity for all). 
48.75
The ALEO's business planning objectives and operational
activities are integrated and aligned closely with The Plan for
North Lanarkshire and in particular with Brighter Futures and
Resilient People. The aims of Routes to Work reflect the
ambitions of the Council in terms of including all residents in the
economic growth of our area.   
46.25
If in house the business planning objectives and operational
activitieswould be integrated and aligned closely with The Plan for
North Lanarkshire and in particular with Brighter Futures and
Resilient People. The aims of the in house provision would continue
to reflect the ambitions of the Council in terms of including all
residents in the economic growth of our area. 
2. Cost / savings - Ensures cost effective, affordable, and
sustainable service delivery.  43.75
Current model is clearly cost effective and transparent in terms of
good value. The ALEO has demonstrated the ability to access
funds which are not available to the Council, either external to
North Lanarkshire or only available to the third sector, and which
can support the delivery of Council services.   
30
There would be additional short term costs in bringing the ALEO in-
house alongside potentially higher long term costs with no access to
alternative streams of funding that are available to third sector
organisations. Overall sustainability of the service would continue to
be dependent on external funds so no additional benefit. 
3. Performance - Maintains influence over service delivery and
performance.  40.8 
An established, effective and focussed performance
management framework has been in place for a number of
years which has generally resulted in the ALEO being associated
with high performance and exceeding/ meeting targets set by the
Council across a range of employability programmes. Service
delivery is not associated with the Council.   
30 
There would be the loss of the current performance management
framework and the management structure around this which
facilitates and develops the performance of staff individually and
collectively. Service delivery would not be perceived as independent
to the Council. 
4. Risk - Minimises future risks to the council.  19.2 
No increased risk to the Council and continued proactive risk
management of an employability service for residents in all
communities. No financial risk associated with changes to
external funding environment.   
9.6
Increased risk to NLC in bringing casework for residents on
employability matters in-house and possible decreased engagement
with services as a result of this. Increased risk to Council in loss of
Board expertise on employability matters and no decrease in risks
related to finance. 
5. Service, project, operational specific - Feasibility of option
under consideration  37.4
Business Plan 2024-2027 confirms ALEO can continue to
operate as it presently does, subject to funding. The ALEO is
highly regarded locally and nationally, its values reflect those of
the Council and it provides an agility and flexibility in employability
services that is enhanced due to its status as a company limited
by guarantee and a charity.   
23.1 
There would be a loss of agility and flexibility if the ALEO was brought
in-house, even after the initial turbulence associated with integrating
90 staff into a Council service and creating a new structure and
performance framework. Operationally there would a risk of residents
not engaging with a service they don't consider independent. 
190   139 
Final score - Option 1 Final score - Option 2
Page 149 of 290

Page 150

Appendix 2(c)
Arms-Length External Organisation (ALEO) 2024 Review
Routes to Work Ltd. – Future development areas 
Strengthen alignment and collaboration 
1. Deepen integration with NLC’s Plan and Programmes of Work – conduct regular joint
strategic reviews with NLC to ensure full alignment with their Plan and evolving
Programmes of Work and incorporate specific objectives from NLC’s strategy into RtW’s
business plans, emphasizing employability and community benefit goals.
2. Flexible and targeted service delivery – leverage the ability to quickly develop and pilot
new services in response to labour market trends or NLC priorities, such as initiatives to
support the economically inactive into work or improve outcomes for school leavers and
expand restorative justice and mental health initiatives to align with NLC’s social value
goals. 
3. Branding and communication – consider highlighting NLC’s role funding and supporting
the ALEO in communications and marketing materials to increase recognition among
participants and employers and the use of co-branded materials to ensure clarity about
NLC’s involvement in service delivery. 
4. Address any duplication in service delivery – conduct a joint review of skills training
services provided by both the ALEO and NLC to identify areas of duplication and
opportunities for streamlining delivery and develop a coordinated skills training strategy to
ensure services complement each other, optimising resources and avoiding inefficiencies. 
Enhance financial sustainability 
5. Funding sources – explore alternative funding streams, such as private sector
partnerships, grant opportunities, and income-generating activities, to reduce reliance on
uncertain funding from NLC or external bodies and investigate opportunities for
commissioned services in collaboration with other local authorities or public bodies. 
6. Evaluate cost structures –conduct a benchmarking exercise comparing ALEO salaries and
management structures to equivalent roles within NLC to ensure costs are proportionate
and justifiable and explore opportunities for cost savings, such as shared services with
NLC or other ALEOs for back-office functions. 
7. Reserves – as a charity organisation, there are requirements regarding reserve policies
per the OSCR directives with possible consideration being given to reviewing the current
level of reserves held by the Company, in keeping with OSCR guidance, to ensure that
operational costs could be met over the short-term. 
Build capacity and mitigate recruitment challenges 
8. Address recruitment and retention challenges – consider further ways and methods to
attract and retain skilled staff and possible partnership with NLC to create a talent pipeline
through apprenticeships, graduate programs, and secondments to address staffing gaps. 
9. Tackle sickness absence issues – compare existing absence management measures and
supports with NLC’s well-being programme identifying any additionality which would aid
RTW to reduce sickness absence rates and achieve consistent and supportive application. 
10. Update skills and capabilities – consider conducting periodic skills audits to identify and
address gaps in the ALEO’s workforce, ensuring the organisation remains responsive to
evolving employability challenges.
Page 150 of 290

Page 151

Appendix 2(c)
Arms-Length External Organisation (ALEO) 2024 Review
Routes to Work Ltd. – Future development areas 
Maximise income generation 
11. Leverage accredited SQA centre status – expand offerings through the SQA centre to
deliver high-demand qualifications, targeting both local residents and external markets for
revenue generation and explore collaborations with educational institutions and
businesses to create bespoke training packages aligned with labour market needs. 
12. Target tendering opportunities – actively pursue tenders for future employability contracts,
emphasizing RtW’s proven track record and specialist capabilities and consider
development of a tendering team or partnership to enhance bid success rates, particularly
for large-scale or multi-year contracts. 
13. Utilise Teckal status – consider expanded use of Teckal provisions to secure additional
contracts without the need for formal procurement, particularly for specialist services in
health, criminal justice and housing.
Page 151 of 290

Page 152

Appendix 3(a)
Arms-Length External Organisation (ALEO) 2024 Review
North Lanarkshire Properties LLP – Summary Findings 
Introduction 
1) In setting its budget on 15 February 2024, the Council instructed a series of service reviews
be undertaken to ensure its remaining ALEOs (Fusion Assets Ltd, North Lanarkshire
Properties LLP and Routes to Work Ltd.) continue to effectively contribute to the delivery
of the Council’s strategic priorities and The Plan for North Lanarkshire. 
2) The Chief Officer (Business and Digital) established an ALEO Review Board in May 2024
to simultaneously progress all reviews. Business and Digital prepared standard assurance
toolkits, with such building upon the intensive review work previously undertaken between
2016 and 2019. The Legal Manager (Democratic and Resources) chaired the Board, with
client leads for individual ALEO’s tasked with ensuring review activity was aligned to
standard assurance requirements. Representatives from Business and Digital, Financial
Solutions, People Resources and Legal and Democratic Services supported all review
activity, engaging with required specialists where necessary.
3) The associated project plan confirmed review findings and associated recommendations
would be presented to the Policy and Strategy Committee for consideration in March 2025.
Review leads (or agreed substitutes) formally advised individual ALEOs of the review
scope, indicative timelines, engagement milestones, and expected reporting.
Scope of Reviews 
4) In recognising this ALEO review had to examine whether external service delivery
remained the best option for the Council, review activity assessed ALEO performance
through the following lenses, with a red, red/amber, amber/green and green rating
mechanism consistently applied to evidence how well each ALEO satisfies expected
requirements:
a. Objectives – level of deliverability, alignment with The Plan for NL and council
strategic priorities, supports best value and continuous improvement, clearly
referenced in up-to-date ALEO strategic documents. 
b. Governance – relevant Articles of Association, meeting arrangements, Board skills
levels.
c. Performance – success in achieving business objectives and key performance
indicators over medium term, status of previous ALEO review recommendations. 
d. Financial – financially sound, level of reliance on Council resourcing, funding trends
and levels over medium term, level of financial commitments, efficiency measures
and levels of service investment. 
e. Service Delivery and Customer Satisfaction – service user accountability, customer
engagement, alignment with council expectations (now and in the future), ease of
flexibility. 
f. Benefits – of delivering services through ALEO mechanisms. 
g. Opportunities – what more can be done through ALEO versus potential delivery
through in-house mechanisms.
Page 152 of 290

Page 153

Appendix 3(a)
Arms-Length External Organisation (ALEO) 2024 Review
North Lanarkshire Properties LLP – Summary Findings 
h. Staffing – benefits and terms and conditions examined alongside establishments to
(a) understand whether sufficient skills, experience and expertise exist and (b)
identify any implications likely to arise should resource transfer into Council. 
i. Risk – effectiveness of management and ‘early warning’ arrangements. 
j. Environment Scanning – level of understanding of internal and external
developments, and potential impact on ALEO operations. 
k. Digital and Technological – assessing cost, feasibility and any security concerns
associated with transferring operations onto Council network and infrastructure. 
5) Evidence obtained through the assurance review was examined in line with the Council
instruction of 15th February 2024 (shown below) using SWOT (strengths, weaknesses,
opportunities, and threats) analysis techniques. Management Committee representatives
of North Lanarkshire Properties LLP were fully engaged in completing the SWOT analysis,
agreeing the RAG ratings allocated within the assurance toolkits, and assisting Council
Officers to uncover potential innovation, growth, or service opportunities. 
OPTIONS Is there evidence available to demonstrate that retaining existing externalised
service delivery remains the best option. 
Is it (1) feasible, and (2) beneficial for North Lanarkshire Property LLP’s
services to be delivered going forward by in-house NLC resources. 
6) Using pre-determined assessment definitions, the effectiveness of these options was
assessed against the Council’s standard appraisal criteria of: 
a. Policy Fit – aligns with the vision in The Plan for North Lanarkshire.
b. Cost/Savings – ensures cost effectiveness, and affordable and sustainable service
delivery. 
c. Performance – maintains influence over service delivery and performance levels. 
d. Risk – minimises future risk to the Council.
e. Feasibility of option under consideration. 
7) A summary of the review findings and outcome of the option appraisal is detailed below. 
ALEO Review Findings 
8) North Lanarkshire Properties LLP assessment covered fifty-seven key areas. During an
engagement session held on 26 November 2024, the ALEO Review Board and LLP
representatives confirmed the RAG ratings as follows: 
Assessment Summary: total
Areas with a Green assessment: 45
Areas with a Green / Amber assessment: 7
Areas with an Amber / Red assessment: 2
Areas with a Red assessment: 3
Page 153 of 290

Page 154

Appendix 3(a)
Arms-Length External Organisation (ALEO) 2024 Review
North Lanarkshire Properties LLP – Summary Findings 
9) Sections 10 to 20 below briefly illustrate how well the ALEO satisfies the areas of
assurance detailed in section 4 above. 
10) Objectives: (4 Green, 2 Amber/Red) NLP generated a substantial capital receipt for the
council through the initial loan agreement in 2013 and successfully re-financed the loan in
2023. The ALEO manages a large portfolio of commercial and industrial properties and is
responsible for the management and leasing of the council’s commercial properties. There
is evidence of income growth within the portfolio and occupancy levels remain high.
Several areas of alignment to the Plan for North Lanarkshire have been identified however,
NLP’s alignment to the plan and strategic direction could be more clearly demonstrated
through the production of an updated Business Plan. Option 2 would provide opportunities
for closer alignment to the Plan.
11) Governance: (Green) NLP is properly constituted in terms of the Companies Act
requirements and takes appropriate advice and action on governance matters. It can
access funding which may not be available to the council. Potentially complex process may
arise in respect of option 2, to transfer NLP’s remit to the council. 
12) Performance: (5 Green, 2 Green/Amber) NLP has demonstrated strong financial
performance and has met all required loan re-payments and covenant ratios. NLP’s focus
on loan re-payments and staff recruitment and retention challenges are however
constraining the company’s ability to perform in other areas.
Performance is monitored by the Board on a quarterly basis and reported to the council’s
Finance and Resources Committee twice yearly.
Option 2 would remove the focus on loan re-payments and provide scope for NLP to focus
more on service delivery and areas of further improvement.
13) Financial: (Green) NLP’s current financial model demonstrates that it can deliver on its
financial objectives which has been proven by its financial performance and ability to meet
the required conditions associated with the loan facility coupled with an ability to reinvest
in its portfolio. Option 2 would require full repayment of the loan, which dependent on
timing of implementation of option 2, would require an investment of between £27.5m and
£29m from NLC. Taking a repayment date of October 2026 as an illustrative example would
see the Council having to identify funding of £28.5m. This would produce an estimated net
position (loan interest savings less break costs) of circa. £4.3m, brings the added benefit
of the Council’s contingent liability (guarantee) being removed, and also removes the
requirement for Council officers to resource ‘loan management’ activities. 
14) Service Delivery & Customer Satisfaction: (3 Green, 4 Green/Amber, 1 Red) NLP is
accountable to its’ management committee, Barclays bank in relation to the loan facility,
external auditors and tenants. The portfolio provides a range of different property types
across the North Lanarkshire Council area. In general NLP receives relatively few
complaints however analysis has shown that there is no evidence of ongoing active
customer engagement. In-house service delivery would not necessarily resolve the
recruitment and capacity issues experienced by NLP as recruitment to professional
Surveying positions is challenging across the public sector.
15) Benefits: (1 Green, 1 Green/Amber) NLP has the ability to access loan finance which is
not an option open to the council. NLP could choose to adopt more innovative and flexible
approaches to its operational structure and management and letting of its property portfolio.
Page 154 of 290

Page 155

Appendix 3(a)
Arms-Length External Organisation (ALEO) 2024 Review
North Lanarkshire Properties LLP – Summary Findings 
16) Opportunities: (Green) NLP’s close alignment to the council’s policies and procedures and
use of services through the SLA can make it difficult for some service users to differentiate
between the council and NLP. There is opportunity under Option 1 for NLP to look at brand
identity, and market driven strategies, to clearly define the company as a separate entity
looking to engage with tenants and prospective tenants to optimise its asset utilisation. 
17) Staffing: (6 Green, 2 Red) The ALEO has a suitable structure establishment for its
operations and also receives strategic leadership, HR and finance support via an SLA with
the Council. Over a number of years, the ALEO has found it challenging to fill management
and key professional roles and as a result has a number of vacancies at professional levels.
Option 1 notes the establishment is suitable however they currently have several agency
staff to supplement their operations due to inability to fill vacancies. It should be noted that
if Option 2 were selected, these are also roles which the Council finds challenging to fill.
18) Risk: (Green) NLP has robust risk management procedures in place and risks are
monitored by the management committee on a quarterly basis. The council provides the
company with an 80% loan guarantee which is the council’s main risk in terms of the current
delivery model. However, close financial monitoring undertaken by Finance as part of the
SLA assists in mitigating against this risk. In-sourcing would be a significant and complex
exercise with potential disruption to service delivery and reputational risk during the
transfer period. The ongoing investigations in relation to RAAC would add additional risk
to in-sourcing at this time.
19) Environmental Scanning: (Green) External factors associated with local and national
commercial property market conditions and the wider economy could impact on the LLP.
No new or proposed legislation that would impact NLP’s operations were identified during
the review period. NLP have actively engaged in several projects associated with the Plan
for North Lanarkshire. 
20) Digital and Technological: (Green) NLP uses the council’s IT network and a number of the
council’s software applications. NLP have their own instances of some software
applications, such as ASH, and there would be scope under Option 2 to review and
streamline the IT requirements. 
Option Appraisal Outcome 
21) Using the finalised SWOT analysis and agreed RAG summary, the ALEO Review Board
completed the Option Appraisal assessment on 9th December 2024. North Lanarkshire
Property LLP’s assessment is attached at Appendix 3(b). Having compared potential
benefits and level of strategic alignment for each option against its feasibility, costs and
risk factors, the Option Appraisal concludes that Option 1 (retaining the ALEO - score
of 132) is presently a better fit for the Council than Option 2 (in-house service delivery–
scores 105), with Option 1 therefore recommended to elected members.
22) Members will wish to note however, that the detailed Option Appraisal provided within
Appendix 3(b) does illustrate that Option 1 doesn’t score highest on every appraisal
criterion. Option 2 scores higher than Option 1 on the Policy Fit/Strategic Alignment and
Performance criteria. In recognising that these effectively account for 45% of the total
weighted score, there is merit in reassessing the findings following finalisation of the
Council’s annual accounts for 2025/26. This is also recommended to elected members.
Page 155 of 290

Page 156

Appendix 3(a)
Arms-Length External Organisation (ALEO) 2024 Review
North Lanarkshire Properties LLP – Summary Findings 
23) In examining all option appraisal criteria together, the ALEO Review Board recommend the
existing externalised delivery arrangements (Option 1) be retained. Appendix 3(b)
illustrates Option One is presently a better fit for the Council because: 
a. Cost/Saving:
NLP can obtain external loan funding which is not an option open to the council. The
LLP is self-financing through rent and other income and in a strong financial position.
Option 2 would require significant use of council reserves as detailed in Section 13
above. In recognising this fact, Option 1 scores better than Option 2 for this
assessment criterion. 
b. Risk:
The main risk to the council with the current delivery model is the 80% loan
guarantee, however close monitoring of the LLP from Finance and track record of
strong financial performance limits this risk.
Option 2 would involve a complex exercise requiring considerable Legal and
Financial support. There is also potential risk in terms of service disruption and
reputational risk during the transfer period which is reflected in the lower score for
this option. 
c. Feasibility:
Resource challenges are constraining NLP’s ability to focus on areas such as forward
planning and strategy however Option 2 is not presently viable. Financial Solutions
advised during the review process that resources are not currently available to re-
pay the loan from reserves because all balances not earmarked as at 31 March 2024
are set aside to support future budget strategies. In recognising this advice, Option 2
therefore presently scores poorly against the ‘feasibility of option under consideration’
criterion. 
24) Whilst Option 1 is recommended, the review did highlight a need to address areas for future
development in North Lanarkshire Properties LLP delivery arrangements, with the RAG
summary above evidencing action is urgently needed in respect of strategic business
planning, alignment with The Plan for North Lanarkshire, customer engagement, and
workforce planning. 
25) The review also highlighted a range of opportunities should be further explored to ensure
North Lanarkshire Properties LLP evidence best value, improve service responsiveness,
secure continuous improvement, and maximise investment in and utilisation of its asset
portfolio. 
Review Recommendations 
26) In taking all factors into account, the ALEO Review Board recommend that North
Lanarkshire Properties LLP prepare a detailed improvement action plan to address the
opportunities and areas for future development outlined within this report, seeking approval
from the Finance and Resources committee, which presently has oversight responsibility
for this ALEO’s performance. 
27) In recognising however that scores for Option Two – deliver services in-house going
forward – would have been very different had Council ‘buy out’ of North Lanarkshire LLP’s
loan with Barclays been considered feasible, the ALEO Review Board have concluded that
the Council may wish to re-examine the feasibility criteria, assessment and scoring,
following the drafting of its 2025/26 Annual Accounts.
Page 156 of 290

Page 157

Appendix 3(a)
Arms-Length External Organisation (ALEO) 2024 Review
North Lanarkshire Properties LLP – Summary Findings 
28) Align portfolio investment with Council’s ‘Transforming Places’ vision and Programme of
Work, working with Council officers to identify properties capable of facilitating
transformational change within town centres and communities.
Page 157 of 290

Page 158

Appendix 3(b)
Arms-Length External Organisation (ALEO) 2024 Review
North Lanarkshire Properties LLP – Option Appraisal Scoring 
Page 158 of 290

Page 159

Appendix 3(c)
Arms-Length External Organisation (ALEO) 2024 Review
North Lanarkshire Properties LLP – Future development areas 
Address Staffing, Recruitment and Succession Planning Challenges
1. Enhance recruitment strategies – target professional roles by emphasising the unique
value of working with the ALEO such as community impact and development opportunities;
partner with universities, professional associations, and apprenticeship programs to build
a pipeline of skilled candidates and consider flexible working arrangements and
opportunities for professional development to attract and retain talent. 
2. Reduce reliance on agency workers - transition from short-term agency contracts to fixed-
term or permanent roles to build institutional knowledge and reduce costs and develop a
plan for knowledge transfer from agency workers to permanent staff before contracts end. 
3. Establish succession planning - address staffing gaps by prioritising the recruitment of key
professional and management roles and implement cross-training initiatives to mitigate
single points of failure and ensure continuity in senior management. 
4. Management of the LLP’s property portfolio – examine and evaluate the potential and
feasibility of outsourcing the management of the LLP’s property portfolio. 
Strengthen Business and Investment Planning
5. Develop a comprehensive business plan – create a detailed business plan aligned with the
Plan for North Lanarkshire and programmes of work including clear objectives,
performance metrics, timelines for monitoring progress and ensuring alignment with
strategic goals. 
6. Review and strengthen investment strategy - formulate an investment plan outlining
priorities for portfolio enhancement, new development opportunities, and potential revenue
streams and explore innovative funding mechanisms, such as public-private partnerships
or alternative loan structures, to free up resources for investment. 
7. Review performance indicators - ensure that performance indicators remain valid and are
aligned with the NLP LLP’s business objectives and the Plan for North Lanarkshire. 
Portfolio Review
8. Consider undertaking a comprehensive property review - conduct a detailed assessment
of all properties, ranking them by performance based on occupancy rates, revenue and
alignment with strategic goals and identify underperforming or surplus properties for
potential disposal to free up resources for reinvestment in higher-performing assets. 
9. Enhance portfolio through condition surveys – consider conducting a comprehensive
program of condition surveys, including RAAC assessments, to identify maintenance
needs and risks and use findings to inform a data-driven investment strategy to maximise
property value.
10. Rent reviews based on market appraisal – perform regular market appraisals to ensure
rental rates are competitive, adjusting rents up or down based on demand, vacancy rates,
and market conditions and introduce dynamic pricing models for flexibility in leasing terms
to attract tenants in fluctuating market conditions. 
11. Adopt market-driven strategies – explore ways to optimise underutilized assets, such as
repurposing vacant properties, offering flexible leasing terms, or diversifying property use
(e.g., mixed-use developments).
Page 159 of 290

Page 160

Appendix 3(c)
Arms-Length External Organisation (ALEO) 2024 Review
North Lanarkshire Properties LLP – Future development areas 
12. Prioritise portfolio investment – use the new investment plan to identify high-priority
improvements for the portfolio, balancing loan repayment obligations with portfolio
enhancement. 
13. Align portfolio investment with Council’s ‘Transforming Places’ vision and Programme of
Work – work with Council officers to identify properties which create scope to facilitate
transformational change within town centres and communities, subsequently disposing of
those properties, transferring interest in them to the Council, and conveying a partial
disposition of the portfolio to the Council. 
14. Clarify portfolio priorities – establish criteria for prioritising legacy and LLP properties,
ensuring resources are allocated effectively. 
Improve Customer Engagement and Clarity
15. Enhance customer communication – consider the development of a communication
strategy that clarifies whether service users are dealing with NLC or the LLP, including
consistent branding and messaging across channels and introduce a customer service
portal or helpdesk to handle queries and streamline engagements. 
16. Increase proactive customer engagement - conduct surveys or focus groups to gather
feedback on customer experiences and identify areas for improvement and share success
stories and updates to build trust and demonstrate value. 
17. Digitisation - explore opportunities to transition requests for service and service delivery
processes to digital platforms.
Page 160 of 290

Page 161

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    SL/LD/MK Date 13/03/25 
First Stop Shop Service Re-design Consultation and Proposals 
From  Stephen Llewellyn, Chief Officer (Housing)  
E-mail llewellyns@northlan.gov.uk Telephone 07939280680 
Executive Summary 
This report sets out the responses received from consultation undertaken in relation to the
proposals to redesign the First Stop Shop operating model. It provides the background to
the reasons for change, which includes but is not limited to, a decline in customer demand,
attributed to the closure of the Municipal Bank and a shift in consumer preference towards
digital methods of contact and payment. It refers to a previous report presented to Housing
Committee on 28 August 2024, which outlines the proposals in detail and from which
Committee agreed an action to undertake consultation on the proposals. 
The report also provides an updated position since the time of the last report, in relation to
the First Stop Shop establishment and financial considerations. 
It sets out how the housing service has considered the consultation findings and seeks
approval for revised proposals to provide a more sustainable future delivery model. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Acknowledge the outcomes from the consultation on the First Stop Shop re-design
proposals.
(2) Approve the integration of six First Stop Shops (Airdrie, Coatbridge, Motherwell,
Wishaw, Cumbernauld and Shotts) with the locality housing offices as outlined in
section 2.37, entailing changes to the First Stop Shop establishment as outlined in
section 2.29 – 2.31.
(3) Approve the adoption of a ‘cashless’ transaction approach as outlined at 2.32 –
2.36.
(4) Approve the closure of four First Stop Shops in Kilsyth, Moodiesburn, Viewpark and
Bellshill and the provision of alternative local surgeries to ensure people can
continue to access services and support in their local area.
(5) Acknowledge that impacts will be closely monitored, with a view to identifying and
implementing any supplementary measures (as required and considered
appropriate) to mitigate/reduce any potential adverse impact that may arise, in
addition to strengthening any positive impact. 
Item 7
Page 161 of 290

Page 162

1. Background 
1.1 A report on the Review and Re-design of First Stop Shops was presented to Housing
Committee on 28 August 2024. 
1.2 This report set out that First Stop Shops (FSSs) were previously the main face to face
contact channel for most key council services and payment transactions. Enquiries
relating to housing, council tax, benefits, environmental services and education have
all been managed through the services provided in the FSSs, providing a single point
of contact for customers. 
1.3 The report also set out that there have been significant changes over recent years
which have led to a steep decline in customer demand, with demand falling by over
86% in the past five year period. These changes have been largely driven by changes
in consumer preferences following the Covid-19 pandemic, in addition to digital
transformation across council services, enabling easier and more convenient access to
services. This shift has led to sustained changes in the way customers interact with
services. Other changes such as the closure of the Municipal Banks in 2022 has also
contributed to the reduction in demand. 
1.4 Data highlighted in the report showed that the majority of enquiries now managed
through the FSSs relate to housing enquiries, accounting for just under 80% of all
enquiries and that although financial transactions continue to be provided in the FSSs,
they have also significantly reduced over the past five years, reducing by 54%1. 
1.5 The review outlined several other drivers for change, many of which related to
employee retention and development and the council’s broader ambition to provide
support at the heart of communities, which is key to fostering strong, resilient and
connected neighbourhoods. 
1.6 The report sought approval on three specific proposals to redesign the service to
provide a more sustainable future delivery model: 
Integration of six and closure of four First Stop Shops with alternative localised
provision 
1) To integrate six FSSs (Airdrie, Coatbridge, Cumbernauld, Motherwell, Wishaw and
Shotts) into housing locality offices. The FSSs in Bellshill, Kilsyth, Moodiesburn and
Viewpark already operate on reduced opening hours, 2 or 3 days per week or morning
only pattern. It was proposed to discontinue office operations in their current format at
these locations to deliver a more efficient alternative in the form of local housing
surgeries in each of these areas. 
Transfer of First Stop Shop employees to the housing service
2) Due to the significant decline in customer demand, a number of posts in the FSS
establishment have been held vacant. It was proposed to reduce the establishment and 
1 Data presented refers to available data at the time of writing the previous Committee Report August 2024.
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (24) Review and design services around people, communities,
and shared resources
Programme of Work Statutory / corporate / service requirement
Page 162 of 290

Page 163

transfer permanent employees to the housing service, with temporary employees
supported in line with the council’s Workforce Change Policy to access vacancies
appropriate to their skills set and experience.  The establishment position has changed
since the writing of the last committee report and there are no longer any temporary
contract employees. An updated position is provided later in this report. 
Initiate cashless payment transactions in offices (cash payment still available through
post office and paypoint)
3) As card payments account for the majority of payment transactions and alternative
‘cash’ payment facilities are available at over 240 paypoint facilities and post offices
across North Lanarkshire, it was proposed to implement a ‘cashless’ payment
approach. 
1.7 Following discussion of the proposals Housing Committee agreed that: 
• A full consultation be undertaken with stakeholders, including, but not limited to,
those who continue to rely on FSSs and those who, pre-Covid made regular use of
this service.
• That a further report be submitted to the following Housing Committee setting out
the costs associated with re-introducing cash payments at Cumbernauld FSS. 
1.8 A subsequent report was presented to Housing Committee on 6 November 2024 which
set out the costs associated with re-introducing cash payments. Costs were estimated
to be in excess of £105,000. There is no allocated provision for these works in the
2025/26 financial year and in the event that the works would be required, an appropriate
funding source would require to be identified in liaison with the council’s Strategic
Capital Delivery Group. 
1.9 The remainder of this report relates to the findings from the consultation undertaken
and ensuing proposals. 
2. Report 
Consultation – methodology and headline response rate 
2.1 The consultation was structured to elicit responses from two key groups, as agreed at
committee: those who used the FSSs prior to the Covid-19 pandemic and those who
currently use the FSS service. 
2.2  Engagement with other services has continued throughout, from the initial stages of
service review and re-design to help understand customer needs, map service
provision and identify potential impact. 
2.3  Four methods of gathering views on the proposals were employed: 
2.3.1  The North Lanarkshire Tenants’ Conference
The North Lanarkshire Tenants’ Conference is held annually and provides one of the
main ways in which to consult tenants on housing and housing related issues that affect
them. Consultation takes place annually on rent setting and various aspects of housing
policy. As the conference was planned for 16 November 2024 it provided a timely
opportunity to carry out initial early engagement with tenants and residents on the FSS
proposals and to formally launch the consultation. The primary aim was to facilitate a
collaborative environment where feedback could be collected from tenants and
residents. To enable this a presentation was delivered providing an overview of the
current position, the driving factors for change, and re-design proposals.  Discussion
Page 163 of 290

Page 164

time was provided and surveys were made available at each table for tenants and
residents to complete. 102 tenants and residents attended the conference, 100 survey
responses were received. 
2.3.2  Telephone surveys
Methods to obtain views from previous FSS customers were explored and it was
determined that the most viable way to achieve this was through a random sample of
customers who previously used FSSs to pay council tax and/or rent. 703 were selected
for telephone interview. The sample included customers who frequented FSSs across
all locality areas. 635 contact attempts were made (68 of the 703 sample selected had
no contact number). Of this only 32 people participated in the survey and 98 people
preferred not to participate (advising they no longer used the FSSs and had no views
on the proposals). The remainder were not able to be contacted, albeit several phone
call attempts were made. Telephone surveys were undertaken over the period 13 – 24
January 2025. 
2.3.3  Face to face surveys
To gather the views of customers who currently use the FSSs, the Tenant Participation
(TP) Team were on site based across FSSs over a two week period 13 – 24 January
2025. The in-person surveys elicited 88 responses. 
2.3.4  Survey forms
In addition to the above, a supply of paper survey forms were provided in the FSSs to
allow customers the opportunity to provide their views out with the times of the face to
face surveys. FSS staff were able to highlight this to customers, with some customers
completing the surveys on site individually or with the support of FSS employees and
other customers taking surveys with them and returning their completed forms at a later
date within the consultation window. 82 completed surveys were collected. 
2.3.5  Promotion/awareness of consultation opportunities
The consultation opportunities were promoted by the council’s communications team,
with details of when the TP team would be available in the FSSs promoted through
social media channels, including the TP facebook page and the North Lanarkshire
Federation facebook page.  Details were also shared more widely with all tenants’ and
residents’ groups. A separate press release on the Tenants’ Conference also included
details about the launch of the consultation. 
Figure 1: Consultation Timeline       
Page 164 of 290

Page 165

Consultation analysis2 
Respondents 
2.4 Overall, 302 individuals responded to the survey. Responses were received from
individuals from all localities, although response rates varied across areas. The highest
proportion of respondents were from Bellshill (17.8%) and Coatbridge (17.8%). The
lowest proportion of respondents were from Kilsyth (2.0%) and Shotts (7.4%). 
2.5  The majority of individuals who responded were in the 65+ years age group (49.3%)
followed by the 51-64 age group (29.0%). The fewest responses were received from
individuals who preferred not to say (2.0%) and the 16-26 years age group (2.7%). 
2.6  Females accounted for the majority of responses (62%). Males accounted for 38%. 
How respondents used/still use First Stop Shops 
2.7  The majority of individuals reported they used a FSS prior to the Covid-19 Pandemic
(72.2%). 
2.8  Most respondents used the FSS prior to the pandemic for payments (72.6%), followed
by housing enquiries (45.1%) and council tax/benefit enquiry (42.8%). 
2.9  72.8% of respondents gave information on how often they use a FSS. Around a quarter
use it weekly (26.4%), a further 21.4% use it fortnightly, 25.9% use it monthly and 5.0%
use it more than once a week. 21.3% use it three times a year or less. 
2.10  From those respondents who reported that they have stopped using a FSS, the majority
said that they use online services (34.6%), followed by telephone (33.3%) and direct
debit/standing order (28.2%). 19.2% of respondents use other methods, which included
using a post office. In some instances respondents thought the FSSs had already been
closed. 
2.11 In terms of current usage, most individuals who responded who said they still use a
FSS, said they use it for payments (71.0%). Housing enquiries were the next most
common reason (44.6%) followed by council tax/benefit enquiry (40.6%). Just over
10% of respondents said they use it currently for ‘other’ reasons, which included,
repairs, blue badge enquiries, help with forms, community alarm payment or laundry
fob top up, collecting waste bags and social work enquiries. 
Payments 
2.12  51.2% of individuals who responded to the survey said they pay for council services by
cash, with 40.1% reporting they pay by card or online and 24.8% by direct debit or
standing order. Of those who use cash, 22.6% stated that they also use card/online
payments, meaning 39.7% use only cash. 
2.13 Most respondents were aware that they could pay for services like rent and council tax
at paypoint facilities and post offices (81.2%). 55.0% of respondents said that they were
able to use online or other payment options, such as paypoint, a post office or pay over
the phone. 
2 Note not all respondents provided responses to every question.
Page 165 of 290

Page 166

2.14 From the respondents who said that they were not able to use these options, over half
said the reason for this was preference (56.8%). A further 18.9% stated it was because
they don’t know how to and 18.9% stated it was because they don’t have a digital
device. A smaller percentage (5.3%) stated other reasons, including delays in
processing Post Office/Paypoint payments, lack of trust in alternative services, not
having the ability to check balances and payment amounts at Paypoints/Post Offices,
and having the ability to carry out multiple tasks at once while in the FSSs. 
2.15  The council has now launched an online rent account facility. This enables tenants to
check their balance in real time and also make rent payments. A promotional campaign
has been launched and over 1000 tenants have now signed up. 
Digital support 
2.16 Despite over two thirds of respondents reporting digital skills or access issues, only
12.2% of respondents were interested in finding out more about support available. 
Views on proposals - cashless transactions 
2.17 The majority of respondents said that they would continue to use the FSSs and pay for
services by card if cashless transactions were introduced (69.3%). 
Views on proposals – integration of six First Stop Shops with local housing offices 
2.18  Respondents were asked whether they agreed with the proposal to integrate six FSSs
into local housing offices in Airdrie, Coatbridge, Cumbernauld, Motherwell, Wishaw and
Shotts. 67.9% of individuals who responded said they agreed with this proposal. 
2.19  Of those who were opposed, some were concerned that the proposals meant they
would no longer have a local office and so were worried about having to travel further.
Some liked the familiarity of the current location. 
2.20  A high proportion of those who provided further information on why they were opposed
commented on the possible closure of the Bellshill and Viewpark offices, which is not
specifically related to this proposal (29.0% of those who said no were from Bellshill). 
2.21 The percentage of those in favour was even higher when considering only those that
would be directly affected by the proposal. Those who were most in favour were from
Airdrie, Coatbridge, Cumbernauld, Motherwell, Shotts and Wishaw. When only
considering these areas, 80.5% were in favour of the proposals. 
Views on proposals – closure of four First Stop Shops and alternative provision of local
housing surgeries 
2.22 Respondents were asked if they agreed with the proposal to close the FSSs at Bellshill,
Kilsyth, Moodiesburn and Viewpark with locality housing surgeries provided in these
areas as an alternative. 53.99% of respondents agreed with this proposal.  33.46%
disagreed and 12.55% were unsure. 
2.23 Most who were in opposition of the proposal were from the Kilsyth, Northern
Moodiesburn and Bellshill areas. Overall, 21.6% of those in affected areas agreed with
proposals. 
2.24 When asked what else may help, respondents suggested: 
Page 166 of 290

Page 167

• FSSs could be put into local libraries
• Issues with telephone enquiries cause people to visit offices in person
• Could consider option to introduce smaller cash offices, open one day a week
• Digital training could be provided in FSSs
• Other options to pay online, that don’t rely on having a physical card, could allow
payments on the go 
2.25 Further detail and analysis on the consultation can be found in the consultation report,
attached as an Appendix to this report. 
Analysis of service demand – an updated position 
2.26 The FSSs continue to experience a sustained lower level of enquiries. The previous
report highlighted an average reduction of 86.1% in enquiries across FSSs over
2019/20 to 2023/24. Housing enquiries accounted for 78.8% of all enquiries but had
also reduced significantly by 71.4%. A reduction of 54% was recorded in payment
transactions and 51% in the transactional amount processed. 
2.27  The table below shows that this downward trajectory continues. 
Table 1: First Stop Shop Enquiries: Average number of enquiries per day (1 June to 31
December 2024) 
FSS Stats June July Aug Sept Oct Nov Dec
Average
Daily
Airdrie 33 24 32 28 31 37 18 32
Coatbridge 32 18 29 33 15 24 12 27
Cumbernauld 18 8 17 19 15 14 7 16
Motherwell 45 24 37.5 29 41 40 26 35
Wishaw 18 21 30 26 25 31 18 27
Bellshill 22 13 14 14 15 18 10 15
Kilsyth 3 2 2 4 2 3 3 3
Moodiesburn 8 5 5 7 4 7 6 6
Shotts 18 17 13 13 20 26 15 20
Viewpark 2 2 2 2 2 2 2 2 
First Stop Shop Establishment – an updated position 
2.28  The FSS establishment comprises 48.17 FTE posts, of which there are currently 23
FTE employees in post. The post of Customer Manager (NLC16) was transferred to
the Customer Service Hub and now sits within Strategic Communications. Due to the
uncertain nature of temporary contracts, some existing temporary employees had
sought permanent employment elsewhere in the council, since the time of the last
committee report, therefore the decision was taken to fill all remaining temporary posts
within the FSS establishment on a permanent basis to ensure staff were retained to
Page 167 of 290

Page 168

prevent attrition having a negative impact on front line service provision.  25.17 FTE
posts are currently vacant, (22.17 FTE at grade NLC5 and 3 FTE posts vacant at grade
NLC7) which have been held due to declining demand for enquiries and pending the
outcome of the service review. 
Service re-design proposals 
First Stop Shop establishment
2.29  An evaluation of the existing structure was undertaken to identify inefficiencies,
overlapping roles, skills, gaps and scope for service optimisation to achieve improved
customer and business benefits.  A new organisational structure integrating FSS
employees within the housing service is proposed to improve productivity, collaboration
and align with the council’s strategic goals. 
2.30  It is proposed that all 23 FTE posts are retained and incorporated into housing services
and that the 25.17 FTE posts which are currently vacant are deleted. The post of
Operations Manager (NLC10) is proposed to be redesignated to Housing Co-ordinator.
There are no proposed changes to the designations of the Team Leader (Customer
Service) and Customer Service Officer posts. These posts were graded NLC7 and
NLC5 partly in recognition of the banking responsibilities previously undertaken in these
roles. To ensure there is no financial detriment to existing employees, a review of the
existing job descriptions and responsibilities of the roles has been undertaken and
alternative responsibilities identified, which subject to job evaluation, will retain the
current grades. 
Table 2:  First Stop Shop Establishment (current and proposed) 
FSS Current
Position
Grade Current
FTE
Delete
FTE
Proposed Grade Proposed
FTE
Operations
Manager
NLC10 1 - Re-
designate
to Housing
Co-
ordinator
NLC10 1
Development
Officer 
NLC7 1 -1 Delete  0
Customer
Service
Team Leader
NLC7  6  -2  Customer
Service
Team
Leader 
NLC7 4
Customer
Service
Assistants
NLC5 40.17  -22.17 Customer
Service
Officer 
NLC5 18
Total  48.17 -25.17   23 
2.31  A communication plan is under development to engage with employees and Trade
Unions on the changes. An implementation plan and timeline to ensure a smooth
transition has also been developed which includes training and role transitioning
support. 
Cashless transactions
2.32  The majority of current financial transactions continue to be card payments. Customers
continue to be supported to set up direct debit payments and to be signposted to the
option of the telephone payment line and online payment portal. For people in receipt
Page 168 of 290

Page 169

of Universal Credit the option of ‘direct payment’ ensures rent is paid directly to the
council (as a landlord) providing a convenient payment option as well as ensuring timely
payment for the council. There are over 240 paypoint facilities and 20 post offices in
North Lanarkshire which also provide ways in which to pay to rent and council tax by
cash. 
2.33  Cashless transactions is currently operational in Cumbernauld FSS. No alternative
premises have yet been identified that could meet the service requirements to provide
a cash payment facility option.  Evidence of success since the introduction of cashless
payments in Cumbernauld FSS has been demonstrated, with productivity and
efficiency improved, enabling resources to be deployed where most needed. There
have been minimal comments or complaints received since its implementation.   
2.34  Due to the sustained reduction in cash payments which is projected to continue as
society continues to increasingly shift towards electronic methods, and that given over
69% of respondents to the consultation said they would continue to use FSS facilities
to pay for council services by card, it is proposed to extend the cashless transactions
approach to all remaining FSS/housing offices.  There are many benefits to this type of
approach. These can include reduced crime rates, enhanced security, easy tracking
and budgeting and reduced operating costs associated with handling, storing and
depositing money. However, there are undoubtedly social issues which exist that
require some consideration. The consultation has highlighted some of these very
issues and has brought to the forefront that effective outreach efforts are vital, to ensure
that people do not experience barriers. 
2.35  Customers need to be fully aware of all options available to them, including the
alternative options to continue to pay cash, should they continue to choose to do so,
and that they are supported effectively to make this transition. 
2.36 The council’s housing/FSS team will focus on the key areas of challenge that come
with this transition to mitigate any potential disadvantage.  Targeted support will be
focused on people who use FSSs who are without access to banking facilities; those
who experience digital connectivity issues, either through access to a digital device or
have limited technology literacy. Working in tandem with other council programmes,
such as Digital NL, measures will be implemented which will improve digital access and
connectivity, and in the short term, a targeted approach will be taken to reach
customers who use only use cash to pay for council services in the FSSs to assess
and address any support needs in the transition. Particular focus will be placed on older
population age groups and people with disabilities. 
First Stop Shop offices 
2.37 The majority of respondents (67.9%) are supportive of the proposal to integrate the six
FSSs with local housing offices, with a greater level of support for those directly affected
(80.5%). It is therefore proposed to integrate Airdrie, Coatbridge, Cumbernauld,
Motherwell, Wishaw and Shotts. 
2.38  Although there is majority support for the closure of four FSSs – Viewpark, Kilsyth,
Moodiesburn and Bellshill (54.0%), it is acknowledged that those directly impacted by
the proposals mostly disagree (73.0%). Whilst this position is acknowledged and
understood, the analysis of service demand continues to demonstrate declining
demand which in the context of the current operating model is unsustainable. 
2.39 It is evident that there is clear scope for integration and coordination, better using our
community assets and resources to achieve greater simplicity and improved outcomes
Page 169 of 290

Page 170

for communities and people in North Lanarkshire. The Plan sets out our shared vision
for a more equal and prosperous North Lanarkshire and the Programme of Work, the
main delivery vehicle, translates this vision into priorities for action. This re-design of
the FSSs contributes to several of the key programmes: 
• Transforming Places – better planning and coordination of public investment to
deliver transformational change in local communities
• Resilient People – working with partners and wider stakeholders to implement
supports that addresses impacts of poverty and reduces inequality through
empowering people and communities and developing resilience
• Digital North Lanarkshire – supporting and improving digital connectivity to harness
the potential of digital transformation in realising improved outcomes for people,
communities and the council 
2.40 The restructure of housing locality teams will assist in facilitating a successful transition
through providing scope for improved flexible local services which will include local
housing surgeries to ensure people can continue to access the support they need in
their local areas. This provision will be monitored and reviewed to make sure they are
accessible, responsive to needs, and user-centred, designed with people and
communities at the forefront.   
2.41  It is also recognised that some people will be more affected than others. This primarily
(but not exclusively) includes older people and disabled people who may experience
greater challenges with some of these proposals. The service is committed to working
with partners to identify and implement measures which will proactively target groups
at higher risk of experiencing disadvantage to ensure that any potential adverse impact
is mitigated. Impact will be closely monitored to identify any other measures required
to address any concerns. 
Financial impact 
2.42  The deletion in posts will result in overall savings of £497,626 being achieved through
the proposed changes to the FSS establishment. With the move to FSS becoming an
HRA function, savings will be realised within both the General Fund and HRA.  Table
3 below shows the financial impact resulting from the Service redesign and how this
is represented within HRA and General Fund. 
Table 3: Service Re-design Savings 
Service Re-design Area
Saving HRA General
Fund
£ £ £
Establishment Changes 568,256 (800,281) 1,368,537
Supporting Budgets 60,035 (22,000) 82,035
Cessation of cash collection 30,100 20,167 9,933
Recharges (160,765) 966,573 (1,127,338)
Total Saving 497,626 164,458 333,168 
Page 170 of 290

Page 171

Financial risk
2.43 Rent and council tax payments represent the majority of payment transactions within
FSSs.  Data highlights that card payments and other digital methods account for the
majority of transactions. Direct debit has been and continues to be proactively
promoted as a convenient payment method, with the FSSs a key enabler in supporting
customers to set up direct debit payment accounts.  The housing locality teams will
continue to promote direct debit as an option following the roll out of ‘cashless’
transactions to further increase the number of tenants and residents signed up to direct
debit, and signpost customers to other alternative methods where direct debit is not an
option.  Council tenants are also encouraged to sign up to ‘direct payments’ which
ensures Universal Credit housing payments are paid directly to the council as their
landlord.  These factors will help mitigate potential financial risk.
3. Measures of success
3.1  Implementation of a new sustainable operating model, which better meets customer
needs, whilst providing improved efficiency of service and improved employee
opportunities. 
4. Supporting documentation
4.1 Appendix – Consultation Report
Stephen Llewellyn
Chief Officer (Housing)
Page 171 of 290

Page 172

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The majority of FSS employees are female.  These proposals impact positively
through providing improved career opportunities.  Although there is no data
available which captures the protected characteristics of FSS customers, it may be
the case that particular population groups/or individuals who share a particular
protected characteristic may be more likely to use FSS services and may therefore
be more affected than others.  This may include older people.  This is reflected in
the consultation carried out. A full EqIA has been undertaken. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Financial impacts are outlined in section 2.44 – 2.45.  £497,626 to be realised in
savings arising from the proposals.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
HR impacts are outlined in section 2.32 – 2.34. All current FSS employees
proposed to be retained and 25.17 vacant FTE posts proposed to be deleted from
the establishment.
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒
Page 172 of 290

Page 173

If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Digital impacts connected to broader aspects of improving digital connectivity and
access generally. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
A communications strategy will require to be developed and implemented to ensure
any key messages surrounding service redesign are communicated and cascaded
effectively to the general public, council services and partners.
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
There are several risks associated with the continuation of the current FSS
operating model.  Failure to adapt the service to meet changing customer needs
presents both financial and reputational risks for the council.  These risks are
recorded on the Service Risk Register.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Page 173 of 290

Page 174

Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 174 of 290

Page 175

First Stop Shop
Consultation
Report
February 2025
Page 175 of 290

Page 176

First Stop Shop Consultation Report  2
1. Background
The First Stop Shops (FSSs) were previously the main face to face contact channel for most key
council services and payment transactions. Enquiries relating to housing, council tax and
benefits, the Scottish Welfare Fund, environmental services and education have all been
managed through the services provided in the FSSs, providing a single point of contact for
customers. Over recent years customer demand has fallen significantly by over 86%. This has
been largely driven by changes in consumer behaviour arising from the pandemic, alongside
developments implemented through the council’s Digital NL programme, which have increased
the range of digital contact options available for customers. This has resulted in more customers
opting for digital and telephone contact options for routine enquiries. The closure of the
Municipal Banks in 2022 has also substantially contributed to the reduction in demand. 
The majority of enquiries now managed through the FSSs relate to housing enquiries. These
include enquiries related to homelessness, anti-social behaviour, rent arrears, income
maximisation, housing allocation, housing support, general housing advice and housing options.
Financial transaction services, such as council tax, rent, blue badge payments and service cash
advances continue to be provided within the FSSs, albeit with much lesser demand for these
services.
The significant decline in customer demand and changing customer preferences has
necessitated a review of the current operating model to ensure the service continues to meet
the changing needs of customers whilst providing best value and a sustainable future delivery
model.
A report was presented to Housing Committee in August 2024, providing an overview of the
current operating model and key issues which have driven a review of the FSS service. It set out
proposals to redesign the service, including:
• The rationalisation of FSS offices; 
• The integration of the FSS service into the existing housing locality structure; and 
• The roll out of a ‘cashless’ financial transaction approach to all remaining offices.
Committee agreed that a full consultation would be undertaken with stakeholders including, but
not limited to, those who continue to rely on FSSs and those who, pre-Covid, made regular use of
this service.
2. Methodology
The consultation was structured to elicit responses from two key groups, as agreed at
Committee: those who used the FSSs prior to the Covid-19 pandemic and those who currently
use the FSS service. Four methods of gathering views on the proposals were employed:
The North Lanarkshire Tenants’ Conference
The North Lanarkshire Tenants’ Conference is held annually and provides one of the main ways in
which to consult tenants on housing and housing related issues that affect them. Consultation
takes place annually on rent setting and various aspects of housing policy. As the conference was
planned for 16 November 2024 it provided a timely opportunity to carry out initial early
engagement with tenants and residents on the FSS proposals and to formally launch the
Page 176 of 290

Page 177

First Stop Shop Consultation Report  3
consultation. The primary aim was to facilitate a collaborative environment where feedback could
be collected from tenants and residents. To enable this a presentation was delivered providing an
overview of the current position, the driving factors for change, and re-design
proposals.  Discussion time was provided and surveys were made available at each table for
tenants and residents to complete. 102 tenants and residents attended the conference. 100
survey responses were received. 
Telephone surveys
Methods to obtain views from previous FSS customers were explored and it was determined that
the most viable way to achieve this was through a random sample of customers who previously
used FSSs to pay council tax and/or rent. 703 were selected for telephone interview. The sample
included customers who frequented FSSs across all locality areas. 635 contact attempts were
made (68 of the 703 sample selected had no contact number). Of this 32 people participated in
the survey and 98 people preferred not to participate. The remainder were not able to be
contacted, albeit several phone call attempts were made. Telephone surveys were undertaken
over the period 13 – 24 January 2025.
Face to face surveys
To gather the views of customers who currently use the FSSs, the Tenant Participation (TP) Team
were on based across FSSs over a two-week period from 13–24 January 2025. The in-person
surveys elicited 88 responses. 
Survey forms
In addition to the above, a supply of paper survey forms were provided in the FSSs to allow
customers the opportunity to provide their views out with the times of the face to face surveys.
FSS staff were able to highlight this to customers, with some customers completing the surveys on
site individually or with the support of FSS employees, and other customers taking surveys with
them and returning their completed forms at a later date within the consultation window. 82
completed surveys were collected. 
Promotion/Awareness of Consultation Opportunities
The consultation opportunities were promoted by the council’s communications team, with details
of when the TP team would be available in the FSSs promoted through social media channels,
including the TP Facebook page. A separate press release on the Tenants’ Conference also
included details about the launch of the consultation. 
Page 177 of 290

Page 178

First Stop Shop Consultation Report  4
3. Respondent Profile
3.1 Area
98.7% of respondents provided information on the area where they live. The spread of
responses is largely consistent with the population distribution across North Lanarkshire, with a
very slightly higher response from the Bellshill and Shotts areas (5% and 4% higher) and slightly
lower in Cumbernauld (6% lower).
When later asked which FSS they used, upward of 74% stated that they use their local office.
Those living in Cumbernauld, Motherwell, Moodiesburn and Shotts showed a higher likelihood
for using another FSS (20-26%). Those in Airdrie, Bellshill, Coatbridge, Kilsyth and Wishaw were
less likely to use another FSS (0-5%).
CHART 1: Response by Area  
Page 178 of 290

Page 179

First Stop Shop Consultation Report  5
3.2 Age
Almost all respondents provided information on their age (97.4%). Just under half (49.3%) were
aged 65 and over, 29.0% were aged between 51-64 years, 10.7% were between 41-50, and 9%
were 40 or under.
CHART 2: Response by Age 
A higher proportion of responses were from females (61.8%). 37.8% of responses were from
males. Proportionally, more males were in the 51-64 age category (34% compared to 25%). More
females were aged 65+ (52% compared to 45%).
4 Usage
4.1 Covid-19
72.2% of respondents stated that they used the FSSs prior to the Covid-19 pandemic. When later
asked if they still use a FSSs, the same overall percentage said they did (73.7%). 
Breaking this down further shows that 81.5% of those who used the FSS prior to Covid still do;
18.4% who used to use a FSS now don’t; 48.3% who previously didn’t now do; and 51.7% who
didn’t before still don’t. There is no significant difference in the reasons for use before and after
Covid, apart from a small increase in the number of ‘other’ enquiries (increased from 13 to 23).
There does not appear to be any significant change in reported usage by area.
While there may be differences for small cohorts or for individuals, there does not appear to be
any noticeable difference in responses comparing pre- to post- Covid for any of the other
questions asked.
Page 179 of 290

Page 180

First Stop Shop Consultation Report  6
4.2 Usage Type
The majority of respondents (71.0%) use the FSSs to make payments. Under half use the FSS for
council tax/ benefit enquiries (40.6%) or for housing enquiries (44.6%). A small percentage use
the FSSs for other reasons (10.3%). This may include enquiries for social work, repairs or blue
badges.
CHART 3: Usage Type 
Generally, there does not appear to be any variation in type of usage by area. There is however a
slight difference in reported usage in Bellshill with a higher number of council tax and benefit
enquiries. The number of housing, or ‘other’, enquiries were proportionally higher in Shotts.
Analysis by age shows that those under 50 were less likely to use the FSSs for payments (39% of
41-50 year olds and 24% of 27–40 year olds, compared to 43% overall). Those aged over 65 were
5% more likely to use the FSSs for payments. There is less variation in those who use a FSS for
council tax enquiries, with all age groups using it more or less equally, apart from those aged
under 40, who were less likely to use it for this purpose (16.1% of those under 40 used it for
council tax/ benefit enquiries). This group were much more likely to use FSSs for housing
enquiries (51.6% of those under 40 used the FSSs for housing enquiries, compared to 27%
overall and 31% for over 65’s).
Those who use a FSS for payments or council tax/ benefit enquiries were more likely to use it
weekly, fortnightly or monthly. Those who use it for housing enquiries either visited on a weekly
basis or much less often.
Of those who previously used a FSS to make payments but no longer do, a third now use online
services, a third pay by telephone and third have set up a direct debit. 
Page 180 of 290

Page 181

First Stop Shop Consultation Report  7
4.3 Frequency of use
72.8% of respondents gave information on how often they use a FSS. Around a quarter of use it
weekly, a further 21.4% use it fortnightly, 25.9% use it monthly and 5.0% use it more than once a
week. 23.3% use it three times a year or less.
CHART 4: Frequency of Use
For all age groups, other than the over 65’s, there appears to be a correlation between the
frequency of use and age. The most commonly chosen option for each age group is:
• Aged 16-26: Less than three times a year 
• Aged 27-40: Monthly
• Aged 41-50: Fortnightly
• Aged 51-64: Weekly
Those over 65 were most likely to use a FSS monthly but a high proportion also used it weekly or
fortnightly.
78 people gave reasons why they have stopped using a FSS. Of these, 34.6% now use online
services, 28.2% have set up a direct debit or standing order, 33.3% use telephone services and
6.4% use online reporting or enquiry forms. 19.2% stated they use another method (however
this survey option was mainly used for general comments about FSSs, not for specifying other
methods).
Younger age groups were more likely to have switched to using online methods, whereas older
age groups were more likely to have set up a direct debit or standing order.
Page 181 of 290

Page 182

First Stop Shop Consultation Report  8
4.4 Paying for council services
51.2% stated that they pay for council services using cash. 40.0% pay by card or online and 24.8%
pay by direct debit or standing order.
Of those who use cash, 22.6% stated that they also use card/ online payments, meaning 39.7%
use only cash.
Those in the 51-64 age group were most likely to use cash to pay for council services, followed by
those aged over 65. Those under 40 were least likely to use cash, instead favouring card or
online methods (and were 20% more likely to pay by card or online methods compared to the
average).
There is some variation between areas with those in Bellshill and Motherwell more likely to use
cash, those in Shotts and Cumbernauld more likely to use card or online methods and those in
Airdrie, Coatbridge and Kilsyth most likely to use direct debits or standing orders.
Only 57.1% of those who pay by direct debit or standing order reported still using FSSs,
compared to 95.9% of those who pay by cash. Those who pay by direct debit were likely to visit
the FSSs far less often too, with only 8.1% stating that they visit a FSSs weekly or fortnightly. This
is in contrast to those who pay by cash, with 40.2% visiting weekly and 23.0% visiting fortnightly.
Those who pay by direct debit visited either monthly, up to three times a year or far less often
(with an even spread between these options).
When later asked if they were aware that you can pay invoices and bills such as rent and council
tax at over 200 Paypoint facilities and over 20 Post Offices in North Lanarkshire, the majority
(81.2%) said they were already aware.
CHART 5: Awareness of alternative payment options
Just over half (55.0%) said they were able to use other payment options, such as Paypoint, a Post
Office, paying over the phone, or online payments. Those who weren’t able to use other
methods were asked why this was the case. Over half stated that it was a preference (56.8%). A
further 18.9% stated it was because they don’t how to and 18.9% stated it was because they
don’t have a digital device. A smaller percentage (5.3%) stated other reasons, including delays in
processing Post Office/ Paypoint payments, lack of trust in alternative services, not having the
ability to check balances and payment amounts at Paypoints/ Post Offices, and having the ability
to carry out multiple tasks at once while in the FSSs.
Page 182 of 290

Page 183

First Stop Shop Consultation Report  9
CHART 6: Ability to use alternative payment methods 
Those in older age groups were more likely to report that they were unable to use alternative
methods of payment (CHART 6). Only 11.8% of those under 40 were unable to use alternative
methods, compared to 58.1% aged over 65. This may seem in contrast to the previous question
were over 65s were only 4% less likely to pay using card or online methods, however may be
explained that those who can switch to other methods have, and those who haven’t either are
unable to or prefer not to.
CHART 7: Ability to use alternative payment options (online, Paypoint, Post Office or telephone), by
method of payment 
Those who use cash to pay for services were more likely to state that they were unable to use
other methods of payment (62.0%). Those who pay by direct debit were almost twice as likely to
be able to use other methods. The reasons for not being able to use alternative methods,
however, didn’t differ between those paying by cash and those paying by card/ online (over half
said it was because they preferred not to, a fifth said it was because they didn’t know how to and
a fifth did not have a digital device). Those who pay by direct debit were more likely state that
Page 183 of 290

Page 184

First Stop Shop Consultation Report  10
they don’t use alternative methods because they don’t know how to, rather than out of
preference.
Those who didn’t have access to a digital device or didn’t know how to use alternative services
were asked if they would be interested in finding out more about the support available to help
them. The overwhelming majority did not want assistance, however 11 people left contact
details. 
5 Response to proposals
5.1 Cashless facilities
Due to a reduction in the demand for cash payments at FSSs, the council is considering
introducing cashless payment facilities only. When respondents were asked if they would
continue to use FSS facilities to pay by card, the majority said they would continue to use the
FSSs (69.3%).
CHART 8: Responses in favour of introducing cashless facilities only, by area 
Respondents from Shotts and Cumbernauld were more likely to continue to use FFSs. These
areas also reported the highest rate of online payments/ card use. Those in Motherwell were
least likely to continue using FSSs (Motherwell also has the second highest percentage use of
cash).
Page 184 of 290

Page 185

First Stop Shop Consultation Report  11
Those who said they wouldn’t use the FSSs if there were only cashless payment facilities
available, stated that this was because:
• They only use cash
• They have always used cash
• Cash is easier for budgeting
• Lack of trust when making card payments
• Job role uses cash e.g. taxi driver
Similar to the previous question on using alternative methods of payment, older age groups
were less likely to continue to use FSSs if they could only pay by cashless methods (CHART 9).
CHART 9: Responses in favour of introducing cashless facilities only, by age
Those who currently pay by cash were less likely to continue using FSSs if only cashless payment
facilities were available (54.2% compared to 82.8% of those using either card/ online payments
or direct debit/ standing orders). When considering those who only use cash, 42.2% were in
favour. 
Page 185 of 290

Page 186

First Stop Shop Consultation Report  12
CHART 10: Responses in favour of introducing cashless facilities only, by payment type 
5.2 Integration with Housing Offices
Due to an overall reduction in footfall at the FSSs, the council is proposing to integrate six FSS
into local housing offices in Airdrie, Coatbridge, Cumbernauld, Motherwell, Wishaw and Shotts,
where the same services will continue to be available.
When asked if they agreed with the proposal to continue to provide the same services within the
reception area of local housing offices in Airdrie, Coatbridge, Cumbernauld, Motherwell, Wishaw
and Shotts, the majority agreed (67.9%). Of those who were opposed, some were concerned that
the proposals meant they would no longer have a local office and so were worried about having
to travel further. Some liked the familiarity of the current location.
A high proportion of those who provided further information on why they were opposed
commented on the possible closure of the Bellshill and Viewpark offices, which is not specifically
related to this proposal (29.0% of those who said no were from Bellshill). This suggests that the
percentage in favour of this particular proposal may be higher than reported.
The percentage of those in favour was even higher when considering only those that would be
directly affected by the proposal. As can be seen in Chart 10, those who were most in favour
were from Airdrie, Coatbridge, Cumbernauld, Motherwell, Shotts and Wishaw. When only
considering these areas, 80.5% were in favour.
Page 186 of 290

Page 187

First Stop Shop Consultation Report  13
CHART 10: Responses in favour of integration with housing offices, by area 
5.3 Closure of First Stop Shops
The four FSSs in Bellshill, Kilsyth, Moodiesburn and Viewpark are underused, with a reduction of
between 54% and 68% in the number of payment transactions in each of these in the past year.
The number of enquiries has also significantly reduced. For example, enquiries have reduced by
94% in the Bellshill FSS and this equates to less than 7 people per day visiting the shop. Most of
these enquiries are for housing issues. Paypoint and Post Office facilities are available in all these
areas.
When asked if they agreed with the proposal to close the FSSs in Bellshill, Kilsyth, Moodiesburn
and Viewpark, and instead provide regular local housing surgeries in these areas, more than half
agreed (54.0%). 33.5% disagreed with the proposal and 12.6% were unsure. 
Page 187 of 290

Page 188

First Stop Shop Consultation Report  14
CHART 11: Responses in favour of the closure of First Stop Shops 
Many of those who were unsure stated that this was because the proposals were not for their
area and so they felt they couldn’t comment.
Those who disagreed, stated a variety of reasons including:
• Needing face-to-face contact to help tackle isolation
• Preference for face-to-face contact so they can more easily explain issues or get
assistance with other enquiries
• Needing FSSs for local people who can’t use public transport or pay for taxis
• Walking to the local FSS gives them exercise
• Most use the FSSs for other reasons, mainly payments, so they wouldn’t use a housing
surgery
• Lack of transport
• Support needed for smaller towns
• Makes it harder for people to get the help they need
• It is an essential service for the elderly or disabled who would struggle otherwise
• Delays with Paypoint can lead to arrears
Most who were in opposition to the proposal were from the Kilsyth, Northen Corridor and
Bellshill areas1.
Overall, only 21.6% of those in the affected areas agreed with proposals (73.0% disagreed). The
percentage is similar in each of areas: 77.1% of those from Bellshill disagreed, 60.0% from
Kilsyth2 disagreed and 66.7% from the Northern Corridor disagreed. 
1 Includes Viewpark
2 Only 5 responses were received from Kilsyth
Page 188 of 290

Page 189

First Stop Shop Consultation Report  15
CHART 12: Responses in favour the closure of First Stop Shops, by area
When asked what else may help, it was suggested:
• FSSs could be put into local libraries
• Issues with telephone enquiries cause people to visit offices in person
• Could consider option to introduce smaller cash offices, open one day a week
• Digital training could be provided in FSSs
• Other options to pay online, that don’t rely on having a physical card, could allow
payments on the go
Other, general, comments received in response to this question include:
• Disinterest in using online or telephone services
• Importance of face-to-face encounters, especially for vulnerable people
• The FSSs provide a good service
• Delays with Paypoint transactions cause unnecessary arrear letters to be sent
• Importance of local services, especially with dwindling town centres
• The ability to pay by cash is a vital service 
Page 189 of 290

Page 190

Page 190 of 290

Page 191

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    SL/MK Date 13/03/25 
Digital Connectivity Masterplan for Council Housing Tenants 
From  Stephen Llewellyn, Chief Officer (Housing)  
E-mail llewellyns@northlan.gov.uk Telephone 07939280680 
Executive Summary 
The purpose of this report is to set out the proposals for a long-term integrated plan to
provide digital connectivity for council housing tenants, creating the foundations for
transformational change to facilitate the introduction of enabling technologies and solutions
across multiple aspects of modern life.   
It builds on previous work undertaken to identify potential delivery options and outlines the
potential benefits of enabling digital connectivity for council housing tenants, which will
open up endless possibilities to radically transform, for the better, the way in which the
council delivers supports and services, empowering tenants with increased choice and
control over how they interact with services, enabling faster access to services and
improving customer experience. At a more fundamental level, the report outlines the
benefits realised which will provide tenants with the foundations to achieve their full
potential and prosper, improving access to opportunities and reducing inequalities. 
Other aspects of the outlining business case are detailed in the report, in that, as more
services are being delivered online, and as online increasingly becomes the preferred
method of contact, digitally excluded people are in danger of being left behind. Exclusion
needs to be overcome by addressing the barriers to opportunity, access, knowledge and
skills for using technology. The focus set out in the report remains steadfast on improving
lives, aligned to The Plan for North Lanarkshire and to the Digital and IT Strategy. 
The report seeks approval to explore the feasibility of carrying out a test of change, subject
to a future committee report, to inform a digital connectivity master plan for council housing
tenants. It also sets out plans to establish a cross service Project Board and Working Group
to progress and oversee the development and implementation of the test of change to
inform the broader expansion of digital connectivity for council housing tenants. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Recognise the potential for transformational change and benefits realisation
through the provision of digital connectivity for council housing tenants.
Item 8
Page 191 of 290

Page 192

1. Background 
1.1 Digital North Lanarkshire is one of the seven priorities within the Programme of Work
for 2023 to 2028. The vision for a Digital North Lanarkshire, with investment targeted
in digital and technological solutions that will be of most benefit to the people and
communities of North Lanarkshire, aims to help realise inclusive growth and prosperity
for all, aligned with the council’s long-term ambition set out in The Plan for North
Lanarkshire. 
1.2 In March 2024, Policy and Strategy Committee approved the Digital and IT Strategy for
2024 to 2027. The Strategy is key to providing the direction to deliver a Digital North
Lanarkshire recognising that technology achieves a multitude of far reaching benefits
for the people and communities of North Lanarkshire. This includes supporting people
to live independently and well in their own homes, providing greater control and choice
over care and support, enabling seamless end to end processes to fulfil service
requests, and creating opportunities to provide more joined up support through more
effective use of data to monitor and manage demand, enabling better targeting of
support and delivery of services to the public. It is key to connecting people and
communities, to developing new ways of working and delivering services to provide
swifter and easier access to support and services, improving customer experience,
alongside a whole array of life outcomes. 
1.3 The Connectivity Framework is key to achieving the vision for a Digital North
Lanarkshire.  Previous reports to the former Transformation and Digitisation Committee
(December 2021, February 2022) outlined the processes undertaken and award of a
Digital Infrastructure Framework to Commsworld Ltd. The Framework has an initial
period of 15 years with the right to extend up to an additional and maximum  5 years. 
1.4 A key aspect of the Commsworld Ltd solution delivery model is to increase the fibre
footprint across North Lanarkshire, enabling Commsworld and partners to offer full fibre
services quicker than the commercial market intended, while increasing supplier
competition, positively impacting on cost and affordability for local residents and
businesses. To date 320km of high-capacity fibre across the authority has been
installed, connecting council premises and enabling communities. 314 sites have been
migrated, with 342 circuits in use, all non-secondary, secondary establishments and
corporate buildings now have enhanced available bandwidth, with larger sites fully
resilient. 90 of 117 sites identified for Public Wi-Fi are now operational. Smart Park
technology has been deployed into Palacerigg and Strathclyde Country Park. 
(2) Acknowledge the previous options feasibility exercise carried out which identifies
potential delivery routes for the provision of super-fast broadband for council
housing tenants. 
(3) Approve exploration of a test of change feasibility, subject to a future committee
report. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work All Programmes of Work
Page 192 of 290

Page 193

1.5 The framework positively influences connectivity across business and communities in
North Lanarkshire and progress achieved to date has created the foundations for
transformational change to facilitate the introduction of enabling technologies and
solutions across all aspects of modern work and life. This will enable the council to
continually develop service delivery across all areas, including housing, health and
social care, asset management, education, culture, and recreation. 
1.6 More specifically, relating to the provision of connectivity to tenants, the aims are to
address digital poverty by delivering a full internet service which is affordable,
superfast, secure, and reliable providing exceptional quality connectivity to all council
housing tenants, with: 
• All council housing tenants having internet access with a speed exceeding the
Government connectivity target
• A service which can support the connectivity needs for the next 20+ years
• Option to replace landline
• A guaranteed price
• A secure service with ability to control content filtering
• Ability to control up sell additional services (e.g., TV channels)
• Easy-to-use in property connectivity with the council systems and devices,
enabling complete integration with service delivery and backend processes 
• Support for a seamless service between pupils learning at home and in the
classroom
• The infrastructure to support rapid deployment of the IoT (Internet of Things) and
smart solutions e.g., telemedicine and healthcare 
2. Report 
The Business Case 
2.1 Although there has been considerable progress achieved in digital transformation
across several areas, digital inclusion remains a key priority for the council. The
Scottish Household Survey (SHS)1 estimates that 10% of households in North
Lanarkshire do not have internet access.  The SHS also shows that across all tenures
social rented tenants are least likely to have internet access, estimated at 15% of social
rented tenants2. The Survey also shows that there is a correlation between digital
exclusion and areas of deprivation, with households in the most deprived areas
experiencing a greater rate of digital exclusion than those in less deprived areas. 
2.2  The council has no right of use of a customer broadband, so any benefits that are
directly associated with consumption by the council cannot be delivered via that route.
The 85% of social rented tenants with internet access have been procured on an
individual basis. This carries limited bargaining power. The potential bargaining power
of the council with over 36,000 council tenants could drive a much better individual offer
for tenants, even without the council directly providing services to the 85% of tenants
who have internet access. 
2.3  More services are being delivered online, and as online increasingly becomes the
preferred method of contact, it means that digitally excluded people are in danger of 
1 The Scottish Household Survey (SHS) internet data tables, local authority level, 2023.
2 Based on the percentage of households across Scotland – data not available at North Lanarkshire level by
tenure.
Page 193 of 290

Page 194

being left behind. We therefore need to overcome exclusion by addressing the barriers
to opportunity, access, knowledge and skills for using technology. The focus remains
steadfast on improving lives and the outcomes required to be achieved from a users’
perspective. This means that the council will continue to ensure that activities
undertaken understand the needs of those experiencing digital exclusion and that there
is a plan of action in place to ensure equity and access for all residents and
communities who experience limited digital connectivity. 
2.4  Although understanding who is digitally excluded is complex and nuanced, as in it
cannot be assumed from demographic groups alone, it is clear that increasing
connectivity can only be a positive thing. Enabling digital connectivity for council
housing tenants will open up endless possibilities to radically transform, for the better,
the way in which the council delivers supports and services, empowering tenants with
increased choice and control over how they interact with services, enabling faster
access to services and improving customer experience. More fundamentally, this will
provide tenants with the foundations to achieve their full potential. It is widely
acknowledged that housing is much more than just ‘bricks and mortar’, the broader
concept of home centres on creating homes and communities that are safe, supportive
and conducive to fostering a sense of community and belonging. This includes aspects
such as: 
• Social infrastructure – access to schools, healthcare, recreational facilities and
public spaces that promote community engagement and well-being  
• Sustainability – incorporating sustainable designs and materials as well as
supporting sustainable lifestyles which help us achieve our climate change net zero
ambition
• Affordability and inclusivity – ensuring that homes are accessible and adaptable to
changing needs of households, preventing social seclusion
• Cultural significance – reflecting the cultural heritage and diversity of the community
within housing designs and urban planning 
2.5 The provision of digitally enabled homes underpins all of these aspects, from
integrating technology to reduce our environmental footprint to enabling means in
which tenants can actively manage and monitor health conditions through telehealth
and assistive technology. The potential benefits are limitless: 
2.5.1   Housing 
• Improved Safety and Security: smart home technology, such as digital locks and smart
alarms, enhancing the safety of tenants by providing real time alerts and monitoring
• Energy Efficiency: smart sensors, thermostats and lighting systems helping reduce
energy consumption, lower energy bills, tackle fuel poverty whilst helping achieve our
climate change goals
• Maintenance/asset management: early detection of issues such as condensation,
damp and mould enabling swift action the prevent problems from occurring, supporting
housing providers to move towards more proactive maintenance, improving the
diagnosis of deteriorating environments to improve health outcomes of tenants and
reduce costs, predictive maintenance helping prevent costly repairs and extend the
lifespan of housing infrastructure
• Improved operation functions: control of sprinkler systems, CCTV, security doors
• Enhanced data management: IoT devices and data analytics providing valuable
insights into housing conditions and tenants’ needs, enabling more informed decision
making
Page 194 of 290

Page 195

• Universal Credit (UC) Applications: currently delivered through an online platform
designed to streamline benefits and make the process more efficient this can present
issues for some people - providing digital access (alongside digital literacy measures)
ensures people have the means to apply for benefits, including their housing costs 
2.5.2  Education/Employability 
• Access to resources: enabling access to a wealth of information, online learning and
digital resources, enabling continuous learning beyond the classroom – supporting our
workforce for the future
• Remote learning: enabling remote and hybrid learning models, making education more
flexible and accessible
• Collaboration tools: online platforms and tools facilitate collaboration among students
and teachers, enhancing the learning experience
• Remote employment: enabling people to work from anywhere, opening up job
opportunities beyond geographical limitations
• Skills development: access to online courses and training helps people to acquire new
skills and improve their employability
• Access to NL Virtual Classroom – for children who are not attending school or are on
a part time timetable, this enables access to learning resources to ensure all children
can access and receive a high quality, differentiated learning experience
• Supporting transition of leaving school – enabling access to an online platform that
provides information on local services and support for young people leaving school to
support positive destinations 
2.5.3  Health and Social Care 
• Telemedicine: enabling consultation with healthcare professionals remotely, reducing
the need for travel and increasing access to healthcare services
• Health monitoring: wearables and health apps enable continuous monitoring of health
metrics, leading to better self-management of long-term conditions
• Information sharing: healthcare providers can share information and collaborate more
efficiently, improving patient outcomes
• Automated systems enabling tenants to control their home environment more easily
• Assistive technologies to enable people to have greater independence and safety in
their own home
• Access to Making Life Easier, a self-assessment platform to support individuals with
health and/or social care needs
• Community Alarm service providing support to individuals requiring an urgent response
via a dispersed alarm unit - broadband connectivity will allow digital connectivity to the
National Shared Alarm Receiving Centre and will provide further resilience
• Opportunities for future proofing to enable people to contribute and have access to their
own social work/health assessment and data 
2.5.4  Social Inclusion
• Community capacity: social media and online communities helping people stay
connected and build relationships, reducing social isolation and improving capacity
• Access to services: digital platforms make it easier for people to access essential
services, such as banking, public services and social support 
2.6   Enabling digital connectivity for council housing tenants will be a major step forward in
ensuring everyone is equally able to engage with public services, whilst helping
address some of the most deep-rooted inequalities in our communities, such as poorer
Page 195 of 290

Page 196

health outcomes, lower life expectancy, loneliness and social isolation, educational
attainment and access to jobs. Digital technology currently and will increasingly play a
crucial role in levelling the playing field across economic, educational, healthcare and
social inequality. By bridging gaps in access, opportunities and resources, digital
technology can considerably mitigate disparities. 
2.7  It also creates multiple opportunities for greater efficiency, with potential for significant
savings achieved through smart housing, care and ultimately smart connected places: 
Smart Housing
• Reduced mould and damp and expensive repairs
• Reduced voids and rental losses
• Reduced contact centre calls 
• Improve access via reminders/improved contacts – reduced housing visits
• Optimised power consumption
• Reduced insurance premiums
• Reduced safety and asset repairs issues 
Smart Care
• Reduced care packages - visits
• Improved medication compliance
• Reduced GP appointments
• Reduced acute hospital admissions
• Reduced need for more intensive support/care
• Reduced delayed hospital discharges
• Reduced falls
• Reduced health care costs associated with early detection of health conditions and
improved self-management long term conditions
• Reduced social isolation pressures 
Smart Places
• Smart assets – community hubs, offices, community facilities
• Smart environment – improved flood prevention and air quality
• Smart infrastructure – smart roads, temperature, disrepair, influencing road
maintenance, smart fleets and routes
• Smart communities – CCTV, smart parks, homes 
2.9 The appendix attached to this report provides an example of how integrating
technology within a home environment can impact positively on people’s lives. 
2.10 This project will build on some of the key projects in motion, such as participation in the
Smart and Connected Social Places initiative (part of the Department for Science
Innovation and Technology 5G Glasgow City Region programme), entailing the use of
IoT in council homes in North Lanarkshire to better understand the efficiency of zero
carbon homes to ensure a just transition as we strive to achieve our net zero goals. 
Options – Previous Modelling 
2.11 Previous work was undertaken in 2022 to identify and cost options to progress the
deployment of superfast broadband to council tenants, with two initial high-level options
presented as possibilities. From this, one option was identified as potentially viable and
more detailed commercial models were developed on this preferred option basis. 
Page 196 of 290

Page 197

2.12  The models made assumptions based on a range of differing potential scenarios in
relation to set up, installation and annual rental.  Each commercial option resulted in
different capital and revenue cost implications.  These ranged from between £19.85
million - £36.86 million in revenue costs (0.8% and 1.2% of planned revenue spend
over the 15 year period modelled) and £32.75 million - £49.75 million in capital costs.
An additional commercial model was also identified within these parameters with
revenue and capital costs estimated at £28.86 million and £40.75 million respectively
(0.7% of planned revenue costs). 
2.13  Estimates did not include inflationary costs over the 15 year delivery period, which
would need to be factored into any refreshed modelling, and as the initial financial
modelling was completed in late 2022 it does not account for any wider market
inflationary changes since then. 
Next steps 
2.14 This modelling exercise illustrates that various delivery routes are possible. It also
highlights that there are significant capital and revenue cost implications, alongside
considerable benefits realisation, with the potential to accelerate the pace of change to
transform communities and people’s lives in North Lanarkshire through digital
connectivity, improving life outcomes across various domains. This combined with rapid
growth and evolving innovation in the development of digital solutions creates an
opportunity to revisit and further explore the potential options to provide digital
infrastructure and internet services to council tenants. 
2.15 To achieve this it is intended to establish a Project Board and Project Working Group,
with the potential for additional subgroups, as necessary, to further develop and refine
a business case for the provision of ultra-fast internet to council housing tenants. 
Although, terms of reference and membership have yet to be finalised, indicative
representatives from services have been identified and it is intended that the group will
undertake a fuller more in depth analysis of potential commercial delivery models
alongside an options appraisal to understand the wider benefits, costs and impacts of
this project. 
2.16  This is a long-term project and the breadth and magnitude of this task should not be
underestimated.  The council has 36,575 homes and this project will have significant
resource implications. From inception to completion it is envisaged this project could
span 10 to 15 years. 
2.17  As an initial step to aid the understanding of benefits, costs and wider factors it is
proposed to carry out an initial test of change. Although the finer details of the test of
change have yet to be fully explored by the Project Working Group and Board, it is likely
that it will involve a smart home model, integrating advanced technology, which will be
tailored to the needs of tenants. 
2.18 It is anticipated that this initiative will require a degree of subject matter expertise, which
may require to be procured from an external organisation with proven proficiency in
understanding and knowledge of smart home technology and experience in
deployment. 
2.19  There will be other considerations in relation to monitoring of data from this test of
change. These relate to privacy (user consent, data minimisation, anonymisation),
security (data encryption, secure devices, network security), compliance (regulatory
requirements such as General Data Protection Regulation), data management (storage
Page 197 of 290

Page 198

and retention) and lastly but not least, ethical considerations (user control, purpose
limitation). 
2.20 It is intended that specific proposals for the test of change will be subject to a future
committee report later in 2025. 
Challenges 
2.21  Digital technology has become a cornerstone of modern life, offering countless
benefits, but it is notwithstanding some challenges. As we become more reliant on
digital technology the threat of cyber-attacks increases, with increasing amounts of data
being collected. Protecting the privacy of individuals is critical with data breaches and
misuses of personal data potential issues.  Other challenges include ethical concerns,
such as the implications of surveillance and moral responsibilities, environmental
impacts and social impacts – job displacement, dependence on technology impacting
on other social interactions. 
2.22 As outlined in section 2.10 there are significant resource implications. The deployment
of digital connectivity for council tenants relies on robust and scalable infrastructure, a
skilled workforce – for developing, maintaining and advancing digital technologies, and
human resource requirements in relation to continuous learning and development to
ensure continued proficiency in new technologies. Clearly there is also significant
financial investment required for research, development and implementation as well as
ongoing operational costs in maintaining digital infrastructure, software and services. 
2.23  Navigating these challenges requires careful consideration and collaborative efforts
across services and sectors. Balancing the benefits of digital technology with these
challenges will be key to fostering a more equitable and secure digital future to deliver
the intended societal benefit and achieve our long-term ambition of inclusive growth
and prosperity. 
3. Measures of success 
3.1  Success will be measured through implementation and completion of a test of change
to identify key learning points to inform the wider implementation of a digital connectivity
masterplan for council housing tenants.   
4. Supporting documentation 
None 
Stephen Llewellyn
Chief Officer (Housing) 
Page 198 of 290

Page 199

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
This report has the potential for significant impacts across several protected
characteristic areas, some of which are compounded due to the intersectional
nature of some protected characteristics/inequalities experienced. It is considered
that on large these impacts are positive should the proposals be approved.  A full
EqIA is underway and will continue to be developed and updated as required. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☒ 
Financial Solutions will be a key member of the proposed project Board tasked with
developing the detailed Business Case
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
Delivering a social housing broadband solution may incur significant investment by
third parties and will require the provision of guarantees on minimum contract term
and volumes. These factors will impact provider offerings and the commercial
structure i.e. upfront and recurring fees. The potential size of this opportunity within
a relatively small geographical area has the potential to affect the local broadband
market and may be considered in terms of a subsidy to any supplier, that is
“providing a significant commercial advantage through funding by public sector”.
The Council will seek legal advice on whether any proposed plan should be
considered a Subsidy and if so how Subsidy Control Principles would be applied.
Legal would also be a key member of the proposed project Board. 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Page 199 of 290

Page 200

5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
This will be considered as the project team. 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Potential for long-term digital transformation and service redesign through the
provision of digital connectivity for council housing tenants.  All impacts are
explored and detailed in the body of the report. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
This will be explored by the project team and actioned accordingly. 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Potential for carbon reduction through easier access to services. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
There exist risks in relation to failure to improve digital connectivity for social
housing tenants, alongside risks in relation to investment/disinvestment in some
areas given the potential financial resource requirements. Risks will be fully
considered by the project team and recorded appropriately.
5.10 Armed Forces Covenant Duty
Page 200 of 290

Page 201

Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
An initial CRWIA has been completed which identified a positive impact for
children, young people and families, through improved access to online learning,
educational opportunities, improved education attainment, socialisation and future
employability prospects. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☒ No ☐ 
Page 201 of 290

Page 202

Appendix – The Benefits of Technology 
Page 202 of 290

Page 203

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    AMcP / GT Date 13/03/25 
Strategic Capital Investment Programme 2024/25 to 2028/29 
From  Andrew McPherson, Depute Chief Executive  
E-mail McPhersonA@northlan.gov.uk Telephone 07939 280467 
Executive Summary
This report provides an annual update on the Council’s Strategic Capital Investment
Programme including an update on available resources and expected profile of expenditure
of the remainder of the current five year capital planning period from 2024/25 to 2028/29. 
The report highlights record levels of capital investment of £856 million over the five year
period as the Council continues the delivery of its long-term place shaping transformation
of North Lanarkshire’s towns and communities. Alongside record levels of investment in
the Council’s housing provision through the Housing Revenue Account, this represents
potential investment of £1.685 billion in North Lanarkshire’s town and communities. 
Key highlights in the proposed investment programme include:
• £347 million to continue investment in the Town and Community Hub programme
and funding to complete projects in Abronhill, Glenboig and Ravenscraig,
• £41 million of additional targeted investment the Council’s school, culture and
leisure estate which will include a strategic review of the Council’s pool estate,
• City Deal investment of £95million, including resources to progress the East Airdrie
Link Road project,
• £45 million investment in the Council’s Economic Regeneration Delivery Plan to
support the ongoing transformation of North Lanarkshire’s town centres, including
ongoing work to transform Cumbernauld town centre, 
• £37 million key infrastructure investment in bridges, flooding, active travel and road
safety,
• £18 million investment in the Parks Masterplan, including funding to enable the
redevelopment of Strathclyde Park Watersports Centre,
• £23 million investment in business and digital systems as the Council continues its
digital offering, and
• £13 million investment in Community Boards with a key aim of evolving the
Council’s approach to facilitating community asset transfers. 
Recommendations 
It is recommended that the Policy and Strategy Committee: 
(1) Acknowledges the forecast resources available to fund the capital programme,
Item 9
Page 203 of 290

Page 204

1. Background 
1.1. The Council’s capital investment plans are underpinned by the Capital Strategy
2024/25 to 2028/29 that was approved at Policy and Strategy Committee in March
2024. The Capital Strategy aims to create an asset base that meets the aspiration for
North Lanarkshire to be the place to Live, Learn, Work, Invest and Visit. 
1.2. The Council adopted this strategy in preparing the Council’s Strategic Capital
Investment Programme, also approved at Policy and Strategy Committee in March
2024. This ambition programme recognised General Services investment of £659.509
million over the five-year capital planning period to support the Council’s aims for place
shaping transformation of North Lanarkshire’s towns and communities. 
1.3. The current capital investment plan is aligned to the Plan for North Lanarkshire to
2028/29 through to Programme of Work activities and importantly aligns with the
Council’s Corporate Asset Management Plan approved in 2022. 
1.4. The capital plan continues to ensure capital investment resources are maximised by
levering additional funding through the Council’s transformative Community Investment
Fund. 
2. Report
Updated Forecast Resources 
2.1. The updated Strategic Capital Investment Programme has been developed based on
the latest estimates of available resources, including government grant, Community
Investment Fund and prudential borrowing. The following table provides an update on
the five-year resource profile: 
(2) Approves the 2025/26 Strategic Capital Investment Programme as outlined in
Appendix 1, 
(3) Approves the updated profile of the Strategic Capital Investment Programme from
2026/27 to 2028/29 as outlined in Appendix 1,
(4) Acknowledges the update on Town and Community Hubs as outlined in paragraph
2.17,
(5) Acknowledges the update on targeted investment in the Council’s existing estate
as outlined in paragraph 2.18, 
(6) Acknowledges that no changes are required to the Capital Strategy 2024/25 to
2028/29 at this stage as outlined in paragraph 2.23, and
(7) Approves the updated Terms of Reference for the Strategic Capital Delivery Group
in Appendix 2. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Page 204 of 290

Page 205

2.2. The forecast resources of £856.536 million represents an increase of £197.027 million
from the capital budget approved at Policy and Strategy Committee in March 2024. The
most significant element of this increase of £146.242 million associated with the
Council’s agreed 2025/26 budget and the intention of the Council to align with the
Council Tax Strategy and recent Community Investment Fund update to committee by
allocating 2% of Council Tax increases towards achieving the Council’s ambitions for
capital investment. 
2.3. The remainder of the movement largely relates to carry forwards from the previous
capital programme into the current five-year planning period (£20.242m) and additional
capital grants (£22.993m) received during 2024/25 and anticipated for 2025/26 and
beyond. 
2.4. While the General Capital Grant has increased to £24.375 million for 2025/26 it is
expected that this will reduce again to previous levels for the remainder of the capital
planning period.  The Scottish Government has previously committed to providing multi-
year indicative allocations, but the most recent announcement was for one year only. 
2.5. An additional £7.550 million in anticipated resources from the Community Investment
Fund is reflective of the annual Community Investment Fund Update presented to
Committee in December 2024. 
2.6. A key part of the Community Investment Fund modelling is the requirement to complete
an annual review of the assumptions and projections. Each review has been presented
to Policy and Strategy Committee and in the event that the assumptions change
significantly this would be considered by the Council’s SCDG in line with its Terms of
Reference and ensuring ongoing compliance with the principles of the Council’s Capital
Strategy. 
2.7. The annual review includes a sensitivity analysis indicating the impact of a significant
changes in assumptions linked to decisions of the Council to earmark Council Tax
increases to support the Community Investment Fund, the wider economic climate
including any impacts on house building and cost of borrowing assumptions. The next
scheduled update will be presented to Policy and Strategy Committee later in 2025. 
Year 1 Year 2 Year 3 Year 4 Year 5 Total
Forecast Available
Resources
2024/25 2025/26 2026/27 2027/28 2028/29
£000 £000 £000 £000 £000 £000
General Capital Grant 23,350 24,375 21,334 21,334 20,254 110,647
Capital Receipts 3,250 3,375 3,375 3,375 3,375 16,750
Residual Pension Cost
Underspends 21,375 23,416 0 0 0 44,791
Service Concession One-Off
Benefit 0 0 0 22,400 22,400 44,800
Council Borrowing (inc.
Community Investment Fund) 68,843 100,214 132,122 78,901 187,717 567,797
External Income Specific
Grants 23,069 18,755 9,278 7,990 12,659 71,751
Total Funding 139,887 170,136 166,109 133,999 246,405 856,536
Page 205 of 290

Page 206

2.8. External capital funding in support of the Council’s capital programme is forecast to be
£71.751 million over the five- year period. This is largely reflective of City Deal Grant
and known Scottish Government grant contributions for areas such as Vacant and
Derelict Land Fund, Regeneration Capital Grant Fund and Placed Based Investment
Programme. It also makes an assumption of anticipated funding from the Scottish
Government’s Learning Estate Investment Programme for Chryston High School
extension. 
2.9. Projected capital receipts of £16.750m have been included in the programme based on
the current estimates of likely future receipts from asset sales. Capital receipts can be
significantly influenced by external market factors so, like all areas of capital resources,
this will be kept under continual review. 
2.10. Following approval of the Council’s 2024/25 Revenue Budget on 15 February 2024 and
acceptance of the Section 95 Officer’s recommended budget strategy, the strategic
capital investment programme assumes the release of one-off resources of £44.791m
from the cost reductions associated with Strathclyde Pension Fund employer
contributions to augment the capital programme and the Town and Community Hub
programme. 
2.11. In addition, at the Council meeting on 23 February 2023 Elected Members approved a
change in the accounting for all of the Council’s existing service concession
arrangements. This changed the way the Council accounts for the public private
partnership (PPP) and design, build, finance and maintain (DBFM) arrangements on
an ongoing basis but the retrospective application of the change in accounting also
released a one-off benefit of £44.800m which has been applied to the strategic capital
investment programme. 
2.12. While the Strathclyde Pension Fund cost reductions are ‘cash backed’ this one-off
accounting benefit is not and, as highlighted in the report to Council in February 2023,
the Council will be required to borrow to fund this expenditure. Therefore, utilising this
one-off benefit to support the capital programme ensures that additional borrowing
costs can be managed over the life of the assets and the impact incorporated into the
Council’s Medium Term Financial Planning assumptions. 
2.13. The forecast resources are expected to increase by 30% from the originally approved
2024/25 to 2028/29 capital programme as approved at Policy and Strategy Committee
in March 2024 and represents the largest ever capital programme proposed by North
Lanarkshire Council. The scale of Council backed investment should be seen in the
context of General Capital Grant resources now representing just 13% of the overall
capital resources forecast over the five-year planning period and provides a clear
statement as to the ambition for economic growth and development by the Council. 
Strategic Capital Investment Programme 
2.14. The table below outlined the updated programme phasing over the current five-year
capital planning period per service area: 
Page 206 of 290

Page 207

2.15. This programme delivers significant ongoing capital investment in North Lanarkshire’s
communities which will support the Council’s ambitions for place making transformation
while supporting the creation and maintenance of jobs in the local economy. It should
be noted that modelling is based on the continuation of  2% ring fencing of future
Council Tax increases over 2026/27 and 2027/28 for allocation to the Community
Investment Fund which follows a similar approach delivered as part of the 2025/26
budget setting process. This will be subject to annual review as part of the Revenue
Budget setting process. 
2.16. In line with the SCDG Terms of Reference, the programme outlined above and in
Appendix 1 will remain under continual review as the programme evolves and will
continue to be reported for approval at Policy and Strategy Committee in Cycle 1 each
year to ensure that the programme continues to reflect any changes in priorities and /
or changes in the resources available. 
Town and Community Hub Programme 
2.17. The proposed strategic capital investment programme’s largest constituent part is the
Town and Community Hub programme with a proposed allocation of £346.670,
representing 40% of the overall resources available. This revised allocation, an
increase of £96.596 million from the previously approved programme, now includes
funding to ensure completion of Community Hubs in Abronhill, Glenboig and
Ravenscraig in line with the Council’s approved revenue budget for 2025/26. 
Targeted Investment 
2.18. The Council’s revenue budget 2025/26 also included allowance for targeted investment
in the Council estate, including schools, culture and leisure facilities. It is expected that
this investment will be accompanied by a strategic review of the Council’s pool estate
with a report submitted to the relevant council committee. Appendix 2 highlights that
total funding for this acceleration of investment totals £41.317 million. 
Future Years
Year 1 Year 2 Year 3 Year 4 Year 5 Total
2024/25 2025/26 2026/27 2027/28 2028/29
£000 £000 £000 £000 £000 £000
Assets and Procurement 22,016 30,328 42,761 32,576 18,706 146,385
Town and Community Hubs 43,574 84,575 52,262 27,488 138,771 346,670
Community Operations 34,092 23,921 32,413 22,654 19,216 132,295
Place 30,689 20,198 23,610 42,071 62,511 179,079
Total Enterprise and
Communities 130,370 159,022 151,046 124,788 239,203 804,429
Adult Social Care 2,171 2,200 2,200 2,200 2,200 10,971
Finance & Technology 5,099 5,272 8,699 3,157 928 23,155
Strategy & Engagement 2,246 2,537 3,060 2,750 2,970 13,563
Total Chief Executive's 7,345 7,809 11,759 5,907 3,898 36,718
Corporate Contingency 0 1,104 1,104 1,104 1,104 4,417
Total Expenditure 139,887 170,136 166,109 133,999 246,405 856,536
Phasing by Service Area
Page 207 of 290

Page 208

2.19. Committee has previously informed of risks associated with expenditure requirements
outwith the current five-year capital planning period to 2028/29. These include
commitments for the City Deal programme in areas such as the East Airdrie Link road. 
2.20. In planning for these future commitments, Committee should be aware that they may
limit scope for other capital investment priorities or may require re-prioritisation of
projects. In addition, this may create additional recurring revenue consequences.
These potential consequences will be monitored through the SCDG and, if appropriate,
factored into the Council’s Medium Term Financial Plan. 
Housing Revenue Account Capital Programme 
2.21. While this report focuses on the Council’s General Fund capital programme, Committee
should be aware of the record levels of forecast investment in the Council’s current and
future housing stock. Over the same 2024/25 to 2028/29 period the HRA’s 30 year
business plan assumption includes forecast investment of £829m across the
mainstream programme and new supply programme. This represents the current
planning assumption while recognising that it continues to be subject to agreement on
future investment targets and funding from rental increases. 
Overall Community Investment 
2.22. Combining the updated General Fund Strategic Capital Investment Programme with
forecast investment in the Housing Revenue Account means that the Council currently
forecasts total Community Investment of £1.685 billion over next five financial years. 
Capital Strategy 
2.23. In accordance with Prudential Code requirements, the Council carries out ongoing
reviews of the Capital Strategy. The most recent Capital Strategy to 2028/29 was
approved at Policy and Strategy Committee in March 2024. At this stage no changes
are required to strategy. 
Review of Strategic Capital Delivery Group Terms of Reference 
2.24. Following changes to the Council’s senior management team structure as outlined in
the ‘One Place One Plan – governance update’ report to Policy and Strategy
Committee in September 2024, the Strategic Capital Delivery Group has reviewed its
Terms of Reference. 
2.25. The changes are summarised as follows: 
• Updated Group Objectives to reflect the SCDG’s revised process for monitoring
capital programme delivery as well as financial management of the capital
programme, 
• Updated membership to reflect senior management team changes and to confirm
the roles of subject matter experts on the group,
• Provision of clarity of the new ‘emerging priorities protocol’ agreed by the SCDG to
manage unfunded burdens. 
2.26. Committee is asked to approve the revised Terms of Reference. 
Page 208 of 290

Page 209

3. Measures of success 
3.1  The SCDG will continue to monitor the financial performance and operational delivery
of the strategic capital investment programme to ensure completion of the programme
in line with available resources.     
4. Supporting documentation   
Appendix 1 – Strategic Capital Investment Programme – 2024/25 to 2028/29
Appendix 2 – Strategic Capital Delivery Group – Terms of Reference 
Andrew McPherson
Depute Chief Executive 
Page 209 of 290

Page 210

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The financial impacts are outlined throughout the report. The Council’s SCDG has
responsibility for ongoing management of the strategic capital investment
programme and the monitoring of the overall programme will continue to be
presented to Finance and Resources Committee at each committee cycle. 
The SCDG will continue to monitor the potential impact of future capital
commitments to ensure aligned with ongoing funding strategies and medium term
financial planning processes. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐
Page 210 of 290

Page 211

If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Through SCDG the Council will be managing ongoing risks associated with the
strategic capital investment programme, including but not limited to:
• Failure to spend in-year capital grant which may result in any unspent portion
being returned to the Scottish Government. However, given the significant level
of Community Investment Fund investment this is risk is deemed to be low at
this stage. 
• Project delays and programme issues that impact on the delivery of the
programme and result in increased costs or reduced outcomes. These risks will
be managed through individual project governance arrangements with
oversight provided by SCDG.
• Commitments beyond the current 5-year cycle will continue to be monitored
and refined with updated funding strategies and incorporated into the Council’s
established medium term financial planning processes. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Page 211 of 290

Page 212

Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 212 of 290

Page 213

Appendix 1
Strategic Capital Investment Programme 2024/25 to 2028/29 
Year 1 Year 2 Year 3 Year 4 Year 5 Total
2024/25 2025/26 2026/27 2027/28 2028/29
£000 £000 £000 £000 £000 £000
Assets and Procurement
Maintaining Existing Assets (windows, re-roofing, re-wiring and
condition survey works for the Council's building assets)
5,596 10,365 10,898 8,599 4,607 40,065
Maintaining Existing Assets (Targeted Investment per Budget
Decision February 2025)
0 5,299 16,516 11,310 8,192 41,317
Carbon Management 1,864 1,164 434 799 389 4,650
Office Rationalisation 937 2,644 4,203 3,004 1,004 11,792
Health & wellbeing and Digital Classrooms 154 150 150 150 93 697
Rationalisation including ASN & Social Work 4,663 2,900 0 230 0 7,793
Curriculum Development 463 720 622 258 258 2,321
Sustainable Estate 1,356 1,060 2,054 1,960 1,121 7,551
Outdoor Education and Outdoor Spaces 3,426 400 400 200 24 4,450
Future Capital Receipts Investment 532 910 586 597 558 3,183
Design Fees 1,700 1,715 1,928 1,984 1,519 8,847
1140 Early Learning and Childcare Expansion 819 0 0 0 0 819
Water Quality 92 100 95 110 105 502
Demolitions / RAAC Repairs 413 2,900 4,875 3,375 836 12,399
Sub-Total Assets and Procurement 22,016 30,328 42,761 32,576 18,706 146,385
Town and Community Hubs
Town and Community Hubs 43,574 84,575 52,262 27,488 138,771 346,670
Sub Total Town and Community Hubs 43,574 84,575 52,262 27,488 138,771 346,670
Community Operations
Operational and Infrastructure Development 13,409 2,398 6,808 6,811 2,211 31,637
Greenspace  and Cemeteries 5,175 1,819 1,867 3,915 4,915 17,691
Greenspace Climate Resilience and Wellbeing 1,015 394 98 98 98 1,703
Parks Master Plan (including Strathclyde Park Watersports
Centre Redevelopment)
1,126 4,972 12,129 144 147 18,518
Roads and Street Lighting/Asset Mgt 12,787 13,787 10,946 11,117 11,277 59,914
Contaminated Land and Resilience 581 550 564 569 568 2,832
Sub-Total Community Operations 34,092 23,921 32,413 22,654 19,216 132,295
Project / Theme
Page 213 of 290

Page 214

Year 1 Year 2 Year 3 Year 4 Year 5 Total
2024/25 2025/26 2026/27 2027/28 2028/29
£000 £000 £000 £000 £000 £000
Place
Economic Regeneration (including investment in town centre
regeneration and business and industrial infrastructure)
9,204 8,196 5,564 11,278 10,615 44,857
City Deal 9,289 3,698 11,300 23,636 47,392 95,315
Enterprise Projects 1,838 0 0 0 0 1,838
Infrastructure and Transportation improvements (including
investment in bridges, reservoirs, flood risk mitigation and road
safety improvements)
10,358 8,303 6,746 7,157 4,504 37,069
Sub-Total Place 30,689 20,198 23,610 42,071 62,511 179,079
Total Enterprise and Communities 130,370 159,022 151,046 124,788 239,203 804,429
Adult Social Care
Equipment and Adaptations 2,171 2,200 2,200 2,200 2,200 10,971
Total Adult Social Care 2,171 2,200 2,200 2,200 2,200 10,971
Finance & Technology
Line of Business (LOB) System Portfolio 619 3,144 7,625 1,891 86 13,366
End User Device (EUD) Refresh 1,664 846 605 1,166 737 5,017
Digitisation & Innovation 2,815 1,283 469 100 105 4,772
Sub-Total Finance & Technology 5,099 5,272 8,699 3,157 928 23,155
Strategy & Engagement
Community Board Project Investment Fund 2,246 2,537 3,060 2,750 2,970 13,563
Sub-Total Strategy & Engagement 2,246 2,537 3,060 2,750 2,970 13,563
Total Chief Executive's 7,345 7,809 11,759 5,907 3,898 36,718
Corporate Contingency
Contingency 0 1,104 1,104 1,104 1,104 4,417
Sub-Total Contingency 0 1,104 1,104 1,104 1,104 4,417
TOTAL GENERAL SERVICES CAPITAL PROGRAMME 139,887 170,136 166,109 133,999 246,405 856,536
HRA Mainstream investment (indicative) 62,160 90,617 125,327 128,879 132,144 539,127
HRA New Supply invesment (indicative) 45,274 61,474 96,775 60,619 25,497 289,639
TOTAL HRA CAPITAL INVESTMENT (INDICATIVE) 107,434 152,091 222,102 189,498 157,641 828,766
TOTAL COMMUNITY INVESTMENT 247,321 322,227 388,211 323,497 404,046 1,685,302
Project / Theme
Page 214 of 290

Page 215

Appendix 2
STRATEGIC CAPITAL DELIVERY GROUP                    
TERMS OF REFERENCE & GOVERNANCE FRAMEWORK 
1. ROLE
The Strategic Capital Delivery Group (the Group) is a working group convened of senior
officers.  The Group advises elected members in terms of capital allocation and project
approval and has responsibility for the strategic management of the capital
programmes, including the realignment of resources to facilitate the effective delivery
of the Council’s Strategic Capital Investment Programme, including: 
• General Services Core Investment Programme (including Town and
Community Hub delivery)
• HRA Mainstream Investment Programme
• HRA New Supply Programme
The Group makes recommendations on and amendments to the approved capital
programmes, as required, with any amendments reported to Committees in line with
the financial regulations and the agreed limits, as outlined in the Terms of Reference &
Strategic Framework. 
1.1  Chair
The Depute Chief Executive will act as Chair of the Group, with the Chief Officer
(Finance & Technology) as Depute. 
1.2 Group objectives
• Monitor the Council’s Strategic Capital Investment Programme, including
performance against delivery aims and objectives; 
• Advise Elected Members on capital allocations and project approval,
making recommendations on and amendments to the approved capital
programme;
• Ensure the proper alignment of capital resources to allow for effective
delivery of the programmes;
• Monitor expenditure projections against budgets and available resources,
revising these where necessary, subject to the limits set out in Section 4
– Authority;
• Ensure robust governance arrangements around the delivery, monitoring
and reporting of capital programmes;
• Monitor outputs and outcomes delivered by capital programmes against
planned outputs and outcomes with services to report exceptions and
remedial actions to the Group;
• Consider the quarterly capital monitoring report to Finance and Resources
Committee to ensure appropriate actions are agreed for review by Elected
Members;
• Ensure Participatory Budgeting principles are embedded in key capital
investment decisions of the Council;
Page 215 of 290

Page 216

• Arrange and undertake training/awareness sessions as required to
reinforce skills/knowledge across the Council in respect of capital
monitoring and capital financing;
• Ensure all decisions made by the Group are Intra Vires and in line with
The Plan for North Lanarkshire. 
2. MEMBERSHIP 
2.1  Membership
Membership to include:
Depute Chief Executive (Chair)
Chief Officer (Finance and Technology) 
Chief Officer (Assets and Procurement)
Chief Officer (Place)
Chief Officer (Housing) 
Chief Officer (Education)
Chief Officer (Community Operations)
Chief Office (Strategy and Engagement) 
Chief Officer (Planning, Performance and Quality Assurance)
Business Finance Manager (Resources Solutions)
Membership of the Group reflects the composition of the capital programmes and
ensures the fair representation of Council services responsible for investment in all
Council assets. Substitutes in the event of a core member’s unavailability are
acceptable but must be from the SCDG maintained list of agreed substitute officers. 
The Finance Manager (Treasury, Capital and Controls) and Finance Manager (Assets
& Procurement and Community Operations) will attend as key advisors to the Group. 
The Group must make decisions on a corporate basis, in line with The Plan for North
Lanarkshire, Financial Strategy, Financial Regulations and other relevant plans and
policies. 
In the event that the Council structure changes the membership will be aligned to the
new structure, unless membership is formally changed by the Policy and Strategy
Committee.   
2.2  Attendance
Where group members are unable to attend meetings, nominated deputies should
attend. Group membership should be representative of the Council services, with
members acting in an independent manner.
Quorum is achieved with 70% attendance (including substitutes). In the event that a
meeting is not quorate, the Group is required to reconvene.
Officers and external parties may be invited to attend meetings of the Group to provide
information/ support and to answer questions in respect of the Council’s capital
programmes. 
3. PROCEDURES
3.1  Meeting Frequency
The Group will meet, as a minimum, quarterly, prior to each cycle of Policy and Strategy
Committee.   
Page 216 of 290

Page 217

3.2  Administration
Administrative support will be arranged by the Chair to coordinate and distribute
agendas, minutes and meeting papers.  Records of all minutes, decisions and actions
will be maintained.
3.3  Submissions and Reports
Group members may make submissions to the Group. Submissions and progress
reports should reach the nominated administrative support no later than five working
days before each meeting.
Urgent matters may be submitted later than this deadline, but only with the approval of
the Chair.
3.4  Agendas and Papers
Agendas will be prepared and distributed to Group members with supporting papers at
least three working days before each meeting. 
3.5  Minutes
Minutes will be taken of meetings and will be distributed in draft via email within five
working days of the Group meeting. Minutes will be approved by the Group at the
following meeting.
3.6  Responsibility for Actions and Communication
Group members shall ensure that any decisions relevant to their Service are actioned
by relevant officers. Responsibility for actions within minutes will be recorded in an
updated work plan as per the outcome of the meeting.
The Depute Chief Executive and Chief Officers shall refer Group decisions to individual
Service Committees for approval or noting, in accordance with agreed limits outlined in
Section 4 – Approvals below, and will advise the Group of outcomes and decisions
made by Committee.
3.7  Special Meetings
Special meetings of the Group may be called at the discretion of the Chair.  As far as
possible, normal procedures will be followed. 
4. AUTHORITY
4.1 Resources
The Capital Programmes are based on estimates of future investment targets funded
by a combination of Scottish Government Grants, capital receipts, CFCR and
prudential borrowing, including Community Investment Fund. When confirmation of
investment targets are reviewed or amendments to resources are known, the Group
will give consideration to adjusting the Programme accordingly. Recommendations for
a revised programme, based on the actual level of resources will subsequently be
referred to Policy and Strategy Committee for approval annually.
4.2 Virement & Re-profiling
4.2.1 General Fund Capital Programme
In the event the Group agrees a virement between approved Project / Thematic
Categories, this will be up to a maximum of £500,000.  Virements above this value
require the approval of the Individual Service Committee (if they remain within Service-
headings), or the Finance and Resources Committee if the virement is across Services.   
Page 217 of 290

Page 218

4.2.2 Housing Capital Programmes 
The Group has the authority to redirect resources across the following Thematic
Categories. These virements should be reported to the Housing Committee:
• Estate Regeneration
• Energy Efficiency
• Major Repairs
• Internal Upgrading
• Tower Strategy
• Community Care
• Fees/Miscellaneous
• New Build
• Council Buy Back Schemes 
The Group has the authority to agree virements up to £1,000,000, virements in excess
of this amount will be reported to the Finance and Resources Committee for noting. 
Virements above this value require the approval of the Housing Committee.
4.3  Re-profiling of Capital Allocations
The Group has authority to re-profile capital allocations within Project / Thematic
Categories up to a maximum of £10,000,000 to and from future years of the Programme
to ensure effective delivery over the 5 year timeframe, provided this can be managed
within the overall annual budgeted resources (i.e. does not create additional
unbudgeted borrowing costs). This will be reported to appropriate Service Committees,
and Finance and Resources Committee for noting.
4.4  Emerging Priorities Protocol
In the event that an unfunded burden is identified, reference should be made to the
agreed Emerging Priorities Protocol as detailed at Appendix 1.
Emergency works outwith the approved Programme should be referred to the Chair
who will consult with the Chief Officer (Finance and Technology) in seeking approval
to proceed and this decision then reported to the Group at the next scheduled meeting. 
4.5 Monitoring
Individual Service Committee reports will provide monitoring information showing the
appropriate level of detail, predominately in line with the project / theme groupings as
laid out within the agreed Strategic Capital Investment Programme or alternatively in
accordance with the appropriate project groupings within the Housing Capital
Programme.
Whilst individual budget holders have responsibility for reporting variances and
ensuring compliance with Financial Regulations and General Contract Standing
Orders, overall responsibility for financial management lies with the Chief Officer
(Finance and Technology). Therefore, Finance staff must be provided with information
for individual projects to allow for effective financial monitoring.
In addition to financial information, services are expected to monitor achievement of
programme and project outputs and outcomes. The Strategic Capital Delivery Group
will monitor the delivery of these outputs and outcomes on a regular basis culminating
in the production of an annual capital delivery report for consideration by the group.
Significant deviation from expected plans will be reported to the group in accordance
with the agreed Programme Delivery Dashboard. 
Page 218 of 290

Page 219

4.6 Sub Groups
To ensure specific management of resources to advance the Plan for North
Lanarkshire and Programme of Work objectives, the Group will establish and delegate
authority to either sub-groups or other governance groups (i.e. Projects Boards), as
considered necessary, including through the Programme of Work Programme Boards. 
The sub-groups will have Terms of Reference and Governance Framework established
which shall include the requirement to report back to the SCDG. 
The following is an example of the governance groups created with delegated authority
from the Group to manage project delivery, including allocating resources:
• Economic Regeneration Delivery Programme (ERDP) Steering Group
Delegated responsibility for managing the ERDP capital programme including
town centre regeneration and external funding streams such as Vacant and
Derelict Land Fund, Town Centre Fund, Place Based Investment Programme
and other capital funds supporting economic regeneration. 
• Town and Community Hub Programme Steering Group
Delegated responsibility for managing Town and Community Hub programme
delivery including assessment of external funding opportunities from the
Scottish Government’s Learning Estate Investment Programme. 
• City Deal and Ravenscraig Steering Group
Delegated responsibility for managing the Council’s City Deal programme
including supporting wider City Region objectives. 
5. POST PROJECT REVIEWS
The Group has oversight of the performance of the Council’s Capital Programmes and
may carry out post implementation reviews, in line with the Council’s Project
Management guidelines.
6. RISK MANAGEMENT
All risks relating to the Programme and to individual projects will be managed in line
with the Council’s Risk Management Strategy and in accordance with Project
Management guidelines. 
Page 219 of 290

Page 220

Appendix 1
Emerging Priorities Protocol 
The strategic capital investment programme will inevitably face ongoing demands for scarce
resources. These unfunded burdens can happen for a variety of reasons but would normally
be linked to the changing scope of already approved projects, the impact of market conditions
on the cost of delivering projects or the identification of new projects. 
This protocol seeks to provide a pathway for services to consider their response to these
emerging priorities to ensure there is a consistency in approach across all service areas. 
Where a service identifies an unfunded burden the following process must be followed (see
recording template in Appendix A): 
1. Services should assess the emerging priority against the other priorities within their capital
investment programme. This should include consideration of the relative risk profile created
by the emerging priority and its contribution to the Plan for North Lanarkshire compared to
deprioritisation of existing spending plans. 
To support this assessment of risk and contribution to the Plan for North Lanarkshire,
reference should be made to the original capital bid template and the original scoring matrix
for the current capital programme as agreed by SCDG. Both of these factors can be found
on the SCDG Teams site (links to be inserted). The risk impact section was detailed as
follows: 
Risk Impact
Audit Scotland guidance expects effective capital programme management to have robust
risk management arrangements in place. This section will support the evaluation of each
project and the contribution it makes to the Council’s overall risk management framework.   
Which corporate or service
risks will the project help to
mitigate? 
What risks are inherent in
the project? 
What are the risks of not
undertaking the project? 
How will the project’s risks
be managed? 
2. In the event that the emerging issue is of a higher priority than existing spending plans,
Chief Officers should consider their current five-year allocation to identify scope to realign
resources by:
a. Removing projects from their programme to fund the emerging burden,
Page 220 of 290

Page 221

b. Rephasing projects across the five-year programme, or
c. Rephasing projects outwith the five-year programme. 
3. In the event that the emerging issue cannot be resolved within the Chief Officer’s own remit
area, consideration should be given to whether points a. to c. above can be managed within
the wider service capital programme in conjunction with the Depute Chief Executive. 
4. The outcome of 2. or 3. above may result in the requirement for a virement or reprofiling
request which will be considered in line with the SCDG’s Terms of Reference. 
5. Where no suitable funding source is identified via steps 1 to 3 above, the Chief Officer
should evidence the outcome of their prioritisation assessment in the form of a briefing note
to SCDG highlighting the process undertaken and the outcome determined. 
6. Thereafter, Chief Officers will be required to complete a Capital Bid Template for the
emerging project (see Appendix B). This will ensure the emerging project can be assessed
against the same scoring criteria and resourcing methodology deployed when assessing
the current Strategic Capital Investment Programme 2024/25 to 2028/29 as approved at
Policy and Strategy Committee in March 2024 (see Appendix C). 
7. Following receipt of the appropriate Capital Bid Template, SCDG will convene an
appropriate evaluation group to score the emerging project. This evaluation group will
include the Depute Chief Executive and Chief Officer (Finance) to ensure a degree of
consistency with the original scoring. A further Chief Officer will be agreed by SCDG as
appropriate and cannot be the Chief Officer submitting the additional project for scrutiny.   
8. After scoring, the project will be assessed against the original scoring outcome for the
2024/25 to 2028/29 capital programme. In the event that the project scores below the
threshold for funding, no funding can be allocated to the project. Where the project scores
above the threshold for funding, those projects with a lower evaluated score will have any
uncommitted funding removed to ensure the emerging project can be funded ((subject to
appropriate virement approvals). 
Page 221 of 290

Page 222

Appendix A
Emerging Priorities Protocol – Decision Recording Template
Stage Action Required Service Assessment
1. Services should assess the emerging priority against the other
priorities within their capital investment programme. This should
include consideration of the relative risk profile created by the
emerging priority and its contribution to the Plan for North
Lanarkshire compared to deprioritisation of existing spending
plans. 
To support this assessment of risk and contribution to the Plan for
North Lanarkshire, reference should be made to the original capital
bid template and the original scoring matrix for the current capital
programme as agreed by SCDG 
Please include details of assessment of relative risk profile
here, including linking to the contribution to the Plan for North
Lanarkshire. 
2. In the event that the emerging issue is of a higher priority than
existing spending plans, Chief Officers should consider their
current five-year allocation to identify scope to realign resources
by:
a. Removing projects from their programme to fund the emerging
burden,
b. Rephasing projects across the five-year programme, or
c. Rephasing projects outwith the five-year programme. 
Please include details of the assessment undertaken on the
potential for allocating resources from the existing capital
programme i.e. which projects should be removed or
rephased. 
3. In the event that the emerging issue cannot be resolved within
the Chief Officer’s own remit area, consideration should be given
to whether points a. to c. above can be managed within the wider
service capital programme in conjunction with the Depute Chief
Executive. 
This may lead to a requirement for a virement or reprofiling
request in line with the SCDG’s Terms of Reference. 
Please include details of the assessment undertaken on the
potential for allocating resources from the wider service capital
programme i.e. which projects should be removed or
rephased. 
Only in the event that these three options have been exhausted for funding an emerging priority should a request for additional
funding be made to the Strategic Capital Delivery Group. Any such request will require satisfactory completion of this template and
the capital bid template before SCDG will consider further. 
Page 222 of 290

Page 223

Appendix B
North Lanarkshire Council
Strategic Capital Investment Programme 2024/25 to 2028/29
Capital Bid Template 
Prepared By: Date: Version   
Project Title/Theme:  Project Ref: 
Service / Division: 
Estimated Cost / Project Bid: 
1. Objectives
Please provide a brief outline of the high level aims and objectives of the project /
programme? 
How should the project be classified (check box)? 
• Unavoidable Commitment (legally committed or committee approved only) ☐
• Asset Management Plan requirement ☐
• New Investment to support the Programme of Work to 2028  ☐ 
Rationale for classification:
Unavoidable Commitment
(Details of legally committed contracts,
projects that have already commenced,
committee approved etc)   
Asset Management Plan requirement
(Provide details of links to corporate or
service asset management plans etc and
statutory basis for the project)   
New investment
(Highlight the relevant Programme of
Work themes) 
Page 223 of 290

Page 224

2. Financial Summary 
Timescales:
Estimated Start Date 
Estimated Completion Date 
Bid Profile
Year 1
(24/25)
£000
Year 2
(25/26)
£000
Year 3
(26/27)
£000
Year 4
(27/28)
£000
Year 5
(28/29)
£000
Total 
£000
Estimated
NLC Capital
Investment
requirement      
Estimated
External
Match
Funding      
Total       
Please indicate if there’s an expectation that the project will span beyond the current 5-year capital
planning cycle: 
Bid Profile
Year 6
(29/30)
£000
Year 7
(30/31)
£000
Year 8
(31/32)
£000
Year 9
(32/33)
£000
Year 10
(33/34)
£000
Total 
£000
Estimated
NLC Capital
Investment
requirement       
Revenue implications associated with capital investment
Please outline any one-off or recurring revenue implications associated with proposed capital
investment. Where possible quantify the impact and how your service proposes to fund any additional
costs: 
Description of Impact Value
(£000)
Savings
(i.e. reduced energy
consumption, income
generation)   
Costs
(i.e. additional
unbudgeted
maintenance costs,
increased staffing
costs from creation of
new facility)  
Page 224 of 290

Page 225

3. Key Deliverables 
Financial
Year
Targeted outputs for each financial
year
(i.e. number of window replacement
projects; number of town centre sites
regenerated; EUD refresh of estate
etc)
Outcomes planned / anticipated for
each financial year
(i.e. impact of projects on overall
condition of the school estate;
improved occupancy of town centre
sites / increased footfall; improved
system and network performance /
improved business continuity etc)
2024/25   
2025/26  
2026/27  
2027/28  
2028/29   
Monitoring and evaluation: 
How will you demonstrate that the objectives, outputs and outcomes outlined above have
been achieved / delivered? 
Page 225 of 290

Page 226

4. Risk Impact
Audit Scotland guidance expects effective capital programme management to have robust risk
management arrangements in place. This section will support the evaluation of each project and the
contribution it makes to the Council’s overall risk management framework.   
Which corporate or service
risks will the project help to
mitigate? 
What risks are inherent in
the project? 
What are the risks of not
undertaking the project? 
How will the project’s risks
be managed? 
Page 226 of 290

Page 227

5. Programme of Work to 2028
This section will support the assessment of New Investment proposals in support of the Council’s
Programme of Work to 2028 Programme of Work to 2028. 
Programme of Work Contribution the project / programme would make to the
Programme of Work 
(Please provide an idea of the scale of impact on PoW ‘Initial
Actions’, ‘Health Check Indicators’ and ‘What will be
achieved’
Transforming Places 
Invest In North
Lanarkshire 
Sustainable Futures 
Resilient People 
Brighter Futures 
Digital NL 
One Service 
Page 227 of 290

Page 228

6. Public Sector Equality Duty and Fairer Scotland Duty
Where the project / programme has an impact as a result of the Public Sector Equality Duty and / or
Fairer Scotland Duty please provide a brief summary: 
PSED and FSD Impact 
Where there is an impact services should ensure that an assessment has been carried out and
published in accordance with the Council’s guidance. 
7. Additional information
Please provide any additional information that may be relevant. 
Additional information 
Page 228 of 290

Page 229

Appendix C
Scoring and Resource Allocation Methodology
Following the submission of capital bids from Services, SCDG members are responsible for scoring the
bids. The overriding principle is to ensure that the capital investment plans align closely to the priorities
of the Council, with each bid assessed as to how it helps advance these aims. This process also
recognises the limits to funding levels available to support the capital investment plans.
Unavoidable commitments relating to projects that have commenced or have been committed by
Committee decision but are not fully funded within the current capital programme and/or are of strategic
importance should be top sliced from the available resources. This also includes an assessment of those
projects or elements of projects that must be completed to reduce the risk of service failures on areas
such as key digital infrastructure, key bridge infrastructure etc
Thereafter capital bids are assessed and prioritised using a weighted scoring model. The key factors and
associated weightings are highlighted in the following table: 
Criteria Score
(%)
1. Statutory requirement  20
2. Manages the Council’s risks 20
3. Revenue consequences 
(high score for delivering savings, low score for increasing cost base)
15
4. Deliverability 15
5. Impact on carbon management 10
6. Contribution to Programme of Work 20
Total 100
Members of SCDG are asked to score each bid against these criteria on a range of 0 to 5, with 0
highlighting no contribution / impact and 5 highlighting maximum contribution / impact. 
The individual scores are then combined to provide a consolidated score. This consolidated score is
converted into a percentage which then allows all projects to be ranked in priority order. 
Those projects with the highest weighted score are allocated the highest percentage of their overall bid
value and conversely if projects scored below the threshold no funding is allocated.
Finally, a programme moderation may take place to assess any significant outliers from the previous
funding allocations i.e. where funding allocations are significantly reduced or significantly increased. In
addition, the final moderation programme may consider whether the funding allocation model would
create any situations where the funding available would result in a ‘do not proceed’ dilemma and
whether that outcome has any significant impacts on the Council’s key ambitions. 
Page 229 of 290

Page 230

Page 230 of 290

Page 231

North Lanarkshire Council
Report 
Does this report require to be approved? ☐ Yes  ☒ No
Ref CR/MD/AMCG Date 26/02/25 
From Claire Rae, Chief Officer, Health & Social Care Partnership
E-mail raeclai@northlan.gov.uk Telephone 
Executive Summary
This paper confirms Cabinet Secretary approval for the revised North Lanarkshire
Integration Scheme for the period 2024 - 2029. This updated version reflects the
outcome of the review and update process undertaken to meet the 5-year review
timeline. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Acknowledge that the Integration Scheme has Cabinet Secretary approval.
(2) Note that the Integration Scheme is available on the HSCP website, Council
website and NHSL website.
(3) Acknowledge that the paper will be presented to the Integration Joint Board on
the 19th March 2025. 
The Plan for North Lanarkshire
Priority Improve the health and wellbeing of our communities 
Ambition statement
(12) Ensure our residents are able to achieve, maintain, and
recover their independence through appropriate supports at home
and in their communities
Programme of Work All Programmes of Work
1. Background 
1.1 The Public Bodies (Joint Working) (Scotland) Act 2014 (thereafter known as the “Act”)
requires Health Boards and Local Authorities to integrate planning for, and delivery of
certain adult health and social care services. The Integration Scheme sets out the
agreement through which NHS Lanarkshire Health Board and North Lanarkshire
Council do this.
1.2 Section 44 of the Public Bodies (Joint Working) (Scotland) Act 2014, notes that “the
Policy and Strategy Committee
Revised North Lanarkshire Integration Scheme 2024 - 2029
Item 10
Page 231 of 290

Page 232

local authority and the Health Board must carry out a review of the integration scheme
before the expiry of the relevant period for the purpose of identifying whether any
changes to the scheme are necessary or desirable”. The legislation clarifies the
“relevant period” as “the period of five years beginning with the day on which the
scheme was approved.
Report Summary of key issues
1.3 The Integration Scheme and its associated paper underwent thorough review by IJB
members in November 2023 and was also presented to the NHS Lanarkshire Board
and North Lanarkshire Policy and Strategy Meeting in December 2023. 
1.4 After receiving approval from the Integration Joint Board, Policy and Strategy
Committee, and the NHS Board in late 2023, the revised Integration Scheme underwent
a comprehensive public consultation process from January 15th, 2024, to February
11th, 2024. This process included dissemination through the Health and Social Care
partnership website, various social media channels, and direct distribution to
stakeholders such as health and social care professionals, service users, caregivers,
third-sector bodies, and locality representatives. 
1.5 With the final Scheme was presented to the Integrated Joint Board, the Policy and
Strategy Committee, and the NHS Lanarkshire Board for formal approval in March
2024. Following this approval, the North Lanarkshire Integration Joint Board submitted
the Integration Scheme to the Cabinet Secretary for endorsement. 
1.6 Following some minor amendments and a final alignment to the wording of hosted
services arrangements with the South Lanarkshire Integration Joint Board Integration
Scheme, Cabinet Secretary approval was confirmed.
Conclusion
1.7 Cabinet Secretary approval for the revised North Lanarkshire Integration Scheme for
the period 2024 – 2029 was confirmed in November 2024. The Integration Scheme is
available on the website.
2. Measures of success 
2.1 Measures of success are already in place for Integration Authorities through the
national health and wellbeing outcomes and outcome indicators. 
3. Supporting documentation 
3.1 Appendix 1 The North Lanarkshire Integration Scheme 2024- 2029
Claire Rae
Chief Officer, Health & Care Partnership 
Page 232 of 290

Page 233

4. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts been discussed and agreed with
Finance?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal
data?
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk
Yes ☐ No ☐
5.6   Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes   ☐ No ☒
If Yes, please provide a brief summary of the impact?
Page 233 of 290

Page 234

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)?
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☒ No ☒
If Yes, please provide a brief summary of the impact? 
The Integration Scheme is available on the HSCP, Council and NHSL website.
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)?
Yes ☐ No ☒
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out?
Yes ☐ No ☐
Page 234 of 290

Page 235

Appendix 1 
Health and Social Care Integration
North Lanarkshire Integration Scheme 2024
Version 3 
Version Control
Version Date
North Lanarkshire Integration Scheme 2014 V1 April 2014
North Lanarkshire Integration Scheme 2019 V2 April 2019
North Lanarkshire Integration Scheme 2024 V3 
Page 235 of 290

Page 236

Contents
1. Introduction ............................................................................................................................. 1
2. The Parties ............................................................................................................................... 3
3. Integration Model..................................................................................................................... 3
4. Local Governance Arrangements ........................................................................................... 4
5. Delegation of Functions .......................................................................................................... 5
6. Local Operational Delivery Arrangements ............................................................................. 8
7. Corporate Service Support ..................................................................................................... 9
8. Supporting Strategic Planning ................................................................................................ 9
9. Performance Measurement ..................................................................................................... 9
10. Support, Care and Clinical Governance ............................................................................ 10
11. Clinical and Professional Governance Framework ........................................................... 11
12. Chief Officer ......................................................................................................................... 13
13. Workforce ............................................................................................................................ 15
14. Finance ................................................................................................................................ 15
15. Communication, Participation and Engagement................................................................ 19
16. Information-Sharing and Data Handling ............................................................................. 20
17. Complaints ........................................................................................................................... 21
18. Claims Handling, Liability and Indemnity ........................................................................... 22
19. Risk Management ................................................................................................................ 23
20. Dispute Resolution Mechanism .......................................................................................... 24
Annex 1 – Delegated Functions ............................................................................................... 26
Page 236 of 290

Page 237

Part 2- Integrated Services....................................................................................................... 33
Annex 2 - Part 1 - Functions delegated by the Local Authority to the Integration Joint
Board ........................................................................................................................................ 35
Health and Social Services and Social Security Adjudications Act 1983 .............................. 39
Part 2 -Services currently provided by the Local Authority which are to be integrated ........ 48
Annex 3 – Hosted Services Arrangements ............................................................................. 50
Annex 4 – Health and Wellbeing Outcomes ............................................................................ 51
Page 237 of 290

Page 238

1 
1. Introduction
The Public Bodies (Joint Working) (Scotland) Act 2014 (the “Act”) requires Health Boards
and Local Authorities to integrate planning for, and delivery of certain adult health and
social care services. This document sets out the agreement through which The Health
Board and The Local Authority do this. 
The creation of an integrated partnership required The Local Authority and The Health
Board to undertake a significant change agenda with the aim of creating services and
supports which build on a solid foundation of success to date. 
The overall aim of the arrangement is the creation and continuation of a partnership
which further improves Outcomes for people who use health and social care services
and their carers. Therefore, a primary focus of the partnership will be delivering on the
nine National Health and Wellbeing Outcomes (the “Outcomes”) of:
• People are able to look after and improve their own health and wellbeing
and live in good health for longer;
• People, including those with disabilities, long term conditions, or who are
frail, are able to live, as far as reasonably practicable, independently and at
home or in a homely setting in their community;
• People who use health and social care services have positive experiences
of those services and have their dignity respected;
• Health and social care services are centred on helping to maintain or
improve the quality of life of people who use those services;
• Health and social care services contribute to reducing health inequalities;
• People who provide unpaid care are supported to look after their own health
and wellbeing, including to reduce any negative impact of their caring role on
their own health and wellbeing;
• People who use health and social care services are safe from harm;
• People who work in health and social care services feel engaged with the
work they do and are supported to continuously improve the information,
support, care and treatment they provide; and
• Resources are used effectively and efficiently in the provision of health and
social care services.
From a North Lanarkshire perspective, our local vision reflects and underpins the higher
level national Outcomes. This is evidenced by the progress towards a personal
Outcomes approach which involves working with people to jointly agree how we support
them to meet their aspirations and goals in life. Consequently, this drive towards
supporting people to meet their Outcomes has resulted in a shared partnership vision
based upon: 
“Working together to improve health and wellbeing in the community – with the
community” 
In pursuit of this vision, and central to our philosophy, will be the following commitments;
Page 238 of 290

Page 239

2 
• We will focus on promoting health improvement and tackling the underlying
causes of ill – health
• We will continue to develop a health and social care system which is
integrated around the needs of individuals, their carers and family Members
• We will be working with people, their carers and families who have a range
of complex support needs to identify the Outcomes they want to achieve in
life. In doing so, our aim will be to provide care and support to help them
realise these Outcomes
• We will put the leadership of clinicians and professionals at the heart of
service delivery for people who require support and their carers
• We will work with partners in the third and independent sectors to remove
unhelpful boundaries and using combined resources to achieve maximum
benefit for patients, service users, carers and families; and
• We will work with a range of agencies and partners to address health and
social inequalities and the subsequent impact of this experienced by people
in their communities.
The following detail provides information relating to ‘how’ the partnership has been
created to deliver against the national Outcomes and intentions of the Act. This
Integration Scheme is the vehicle through which assurance is given to the Local
Authority, the Health Board and the Scottish Government that the intentions of the Act
are being delivered by the Integration Joint Board. 
This Integration Scheme forms the basis of a legal agreement with the Scottish
Government and lasts for a maximum duration of five years, after which point it will be
refreshed. However, in circumstances where there is agreement between the Parties,
this Integration Scheme can be refreshed within an earlier timeframe.
This Integration Scheme first came into effect in April 2016, with a refresh of the North
Lanarkshire Integration Scheme implemented in April 2019.
Page 239 of 290

Page 240

3 
2. The Parties
North Lanarkshire the Local Authority, established under the Local Government etc.
(Scotland) Act 1994 and having its principal offices at the Civic Centre, Windmillhill
Street, Motherwell, North Lanarkshire 
And 
NHS Lanarkshire Health Board, established under Section 2(1) of the National Health
Service (Scotland) Act 1978 and having its principal offices at Kirklands Hospital,
Fallside Road, Bothwell, Lanarkshire (together referred to as “the Parties”)
In implementation of their obligations under the Act, the Parties hereby agree as follows: 
Definitions and Interpretation 
“The Act” means the Public Bodies (Joint Working) (Scotland) Act 2014.
“The Parties” means The Health Board and North Lanarkshire the Local Authority.
“The Health Board” means NHS Lanarkshire Health Board.
“The Local Authority” means North Lanarkshire Council.
“The Scheme” means this Integration Scheme.
“Integration Joint Board” or “IJB” means the Integration Joint Board to be established
by Order under Section 9 of the Act. 
“Members” means Members of the Integration Joint Board. 
“Outcomes” means the Health and Wellbeing Outcomes prescribed by the Scottish
Ministers in Regulations under Section 5(1) of the Act. 
“Integration Board Order” means the Public Bodies (Joint Working) (Integration Joint
Boards) (Scotland) Order 2014. 
“Integration Joint Board, Performance, Finance and Audit Committee” (IJB PFA)
means the committee which the Integration Joint Board has delegated authority for
business relating to performance, finance and audits reports/updates. 
“Strategic Plan ” means the plan which the Integration Joint Board is required to
prepare and implement in relation to the delegated provision of health and social care
services in accordance with Section 29 of the Act.
3. Integration Model
In accordance with Section 2(3) of the Act, the Parties have agreed that the integration
model set out in Sections 1(4)(a) of the Act will be put in place for North Lanarkshire,
Page 240 of 290

Page 241

4 
namely the delegation of functions by the Parties to a body corporate that is to be
established by Order under Section 9 of the Act. 
4. Local Governance Arrangements
4.1 The Integration Joint Board will be responsible for the Strategic Planning of the
functions delegated to it and for ensuring the delivery of its functions through the
locally agreed operational arrangements set out within this Scheme.
4.2 The regulation of the Integration Joint Board’s procedures, business and meetings
will follow the IJB’s own standing orders which may include additional matters to
those set out within the Integration Board Order.
4.3 The Integration Joint Board and the Parties will collaborate and interact in order to
contribute to the Outcomes. However, the Integration Joint Board, when established,
will have distinct legal personality and the consequent autonomy to manage itself.
4.4 There will be eight Voting Members on the Integration Joint Board comprising four
elected Members from The Local Authority and 4 Members from the Health Board.
4.5 The Non-Voting Membership prescribed in the Integration Board Order is as follows;
• The Chief Officer of the Integration Joint Board
• The Chief Social Work Officer of the Local Authority appointed by it in terms
of Section 3 of the Social Work (Scotland) Act 1968
• The proper officer of the Integration Joint Board appointed under Section 95
of the Local Government (Scotland) Act 1973(a) i.e. the Chief Finance
Officer
• A registered Primary Care medical practitioner; whose name is included in
the list of primary medical service performers prepared by the Health Board
in accordance with the regulations made under Section 17P of the National
Health Service (Scotland) Act 1978’
• A registered Nurse who is employed by the Health Board or by a person or
body with which the Health Board entered into a general medical services
contract; and
• A registered medical practitioner employed by the Health Board who does
not provide primary medical services.
Page 241 of 290

Page 242

5 
4.6 Once the Integration Joint Board is established it must appoint, in addition, at least
one member in respect of each of the following groups in terms of the Integration
Board Order:
• Staff engaged in the provision of services provided under integration functions
• Third Sector bodies carrying out activities related to health or social care in
North Lanarkshire
• Service users residing in North Lanarkshire; and
• Persons providing unpaid care in North Lanarkshire.
4.7 The Integration Joint Board may appoint such additional Members as it sees fit.
4.8 The responsibility for appointing the Chair and Vice Chair will alternate between the
Parties and the appointments will be made for a period of 3 years. Within this period,
each Party may change its appointment as Chair or Vice Chair at any time and it is
entirely at the discretion of the Party which is making the appointment to decide who
it shall appoint. 
4.9 The term of office of a member of the Integration Joint Board is a maximum of three
years. The Integration Joint Board Voting Members appointed by the Parties will
cease to be Members of the Integration Joint Board in the event that they cease to
be a Non-Executive or Executive member of The Health Board or an elected member
of The Local Authority. At the end of a term of office a member may be reappointed
for a further term of office. The Chief Social Work Officer, Chief Officer and Chief
Finance Officer remain Members of the Board for as long as they hold the office in
respect of which they are appointed.
4.10 Whilst serving on the Integration Joint Board its Members carry out their functions
under the Act on behalf of the Integration Joint Board itself, and not as delegates of
their respective Heath Board or Local Authority.
4.11 In accordance with good practice, it is expected that the Integration Joint Board will
establish an audit committee to support the overall governance and scrutiny
arrangements. The Parties recognise that the establishment of any committees by
the IJB are a matter to be determined by the IJB. The North Lanarkshire Integration
Joint Board, Performance, Finance and Audit Committee has been established within
North Lanarkshire to fulfil this purpose. 
4.12 Detailed protocols and reporting arrangements will be established to ensure the
Parties and the Integration Joint Board have free access to all relevant information
for the purposes of planning and decision making.
5. Delegation of Functions
The functions that are to be delegated by the Health Board to The Integration Joint
Board are set out in Part 1 of Annex 1. These functions are delegated only to the extent
Page 242 of 290

Page 243

6 
that they relate to the listed services. The services to which these functions relate, which
are currently provided by the Health Board and which are to be integrated, are set out in
Part 2 of Annex 1. Broadly these are as follows; 
5.1 Hospital Services
The functions in relation to the hospital services noted below will be delegated in respect
of adults and children
5.1.1 Accident and emergency services provided in a hospital
5.1.2 Inpatient hospital services relating to the following branches of medicine:
• General medicine
• Geriatric medicine
• Rehabilitation medicine
• Respiratory medicine
• Palliative care services provided in a hospital
• Paediatrics
• Psychiatry of learning disability
• Inpatient hospital services provided by general medical practitioners;
•  Services provided in a hospital in relation to an addiction or dependence on
any substance; and
•  Mental health services provided in a hospital except regionally or nationally
organised forensic mental health services.
5.2 Community Services
The functions in relation to the community health services noted below will be
delegated in respect of adults:
• District nursing services
• Health Visiting
• Allied health professionals in an outpatient department, clinic, or out with a
hospital
• Public dental services
• Primary medical services
• General dental services
• Ophthalmic services
• Pharmaceutical services
• Primary care out-of-hours
• Geriatric medicine
• Palliative care
• Community learning disability services
• Kidney dialysis services
• Mental health services
• Continence services
• Community paediatrics
Page 243 of 290

Page 244

7 
• Community children’s services
• School nursing services; and
• Services provided by health professionals that aim to promote public health. 
5.2.1  The functions delegated by The Local Authority to the Integration Joint Board are
set out in Part 1 of Annex 2. The services to which these functions relate are set
out in Part 2 of Annex 2 and relate to adult services only:
• Social work services for adults and older people
• Services and support for adults with physical disabilities and learning
disabilities
• Mental health services
• Drug and alcohol services
• Adult protection and domestic abuse
• Carers support services
• Community care assessment teams
• Support services
• Care home services
• Adult placement services
• Health improvement services
• Aspects of housing support, including aids and adaptions
• Day services
• Local area co-ordination
• Respite provision
• Occupational therapy services; and
• Re-ablement services, equipment and telecare. 
5.3 Annex 3 sets out arrangements for hosted services. This relates specifically to
health services which spans more than one Integration Joint Board and are subject
to Integration Joint Board approval.
5.4 The Integration Joint Board is a Category 1 responder under the Civil
Contingencies Act 2004, as per the amendment to the Act in 2021. This ensures
that where there is a risk of an emergency which will impact functions delegated to
the Integration Joint Board, there will be formal coordinated and appropriate
arrangements in place for emergency planning; information sharing and
cooperation with other responders; and joined up information sharing and advice
for the public. The IJB is represented at the Local Resilience Partnership by the
Chief Officer.
Page 244 of 290

Page 245

8 
6. Local Operational Delivery Arrangements 
6.1 The Integration Joint Board meets a minimum of four times per year in public and
publishes all agendas, papers and minutes with responsibility for the delivery of
integrated functions as set out in annexes 1,2 and 3 and provides operational
oversight of integrated services delegated to them. 
6.2 The operational role of the Chief Officer is set out within Section 12. 
6.3 The Health Board will retain direct operational oversight of the acute services as
set out in annexes 1,2 and 3 and will provide information on a regular basis to the
Integration Joint Board about the delivery of these services. 
6.4 The Integration Joint Board is responsible for the development of a Strategic
Commissioning Plan as per Section 29 of the Act. This plan sets out arrangements
for carrying out the integration functions and how these contribute to achieving the
Outcomes as outlined in Annex 4. 
6.5  A locality model has been developed by the Integration Joint Board to underpin the
development of the Strategic Commissioning Plan. 
6.6 From an acute hospital service perspective, operational plans for integrated acute
service delivery are subject to directions from the Integration Joint Board about the
exercise of delegated functions in relation to these services. These will also be
informed and directed by the Strategic Commissioning Plan.
6.7 The Chief Officer is responsible for directly implementing the Integration Joint
Board’s directions to locality delivery on the ground.
6.8 From an operational and performance management perspective, the Integration
Joint Board/ The Integration Joint Board, Performance, Finance and Audit
Committee will receive regular reports from the Chief Officer and other responsible
officers of the parties on the delivery of integrated services and will issue directions
in response to those reports to ensure improved performance. This includes a range
of thematic reports will include, but are not limited to, the following:
• Finance Reports
• Performance against the National Health and Wellbeing Outcomes
• Regulation and scrutiny activity
• Inspection Outcomes
• Support, Care & Clinical governance reports to be assured of the delivery of
safe and effective services
• Public Protection reports
• Engagement and community co-production reports from each of the Locality
Management teams
• Annual staff governance and workforce planning report
Page 245 of 290

Page 246

9 
• Improvement plans and reports; and
• Risk reports/management plans. 
6.9 The Act requires the Integration Joint Board to publish an Annual Performance
Report by July of each year. 
7. Corporate Service Support 
7.1 The Parties will support the work of the Integration Joint Board by supplying all
relevant information, data and corporate support services such as financial, legal,
human resources, IT, planning, risk management, audit, administrative etc. for the
Integration Joint Board to carry out its functions. This will include information on
cross boundary flow into and out with the Health Board. 
7.2 The current arrangements for providing corporate support services in respect of
delegated functions and the associated service provision will be reviewed by the
Chief Officer and the responsible officers of the Parties on an ongoing basis.
8. Supporting Strategic Planning 
8.1 As outlined in Section 30(3) of the Act, the Integration Joint Board must have regard
to the effect that their Strategic Commissioning Plan will have on facilities, services
or resources which are used in relation to arrangements set out or being considered
to be set out in a Strategic Plan prepared by another Integration Joint Board. 
8.2  In assessing the health element of this, The Health Board will provide the
necessary activity and financial data for services, facilities and resources that relate
to the planned use of services provided by other Health Boards by people who live
within the area of the Integration Joint Board.
8.3 In circumstances where The Health Board or The Local Authority intend to change
service provision of non-integrated services that will impact directly on the Strategic
Commissioning Plan, they will advise the Integration Joint Board of this. 
9. Performance Measurement 
9.1 Through the development of the Strategic Commissioning Plan, the Outcomes are
used to develop a performance reporting framework which underpins the Plan.
9.2 The Parties have established an integrated performance reporting framework
which considers and develops a local suite of measures and targets that relate to
the provision of integration functions. The measures and targets are aligned to the
Outcomes and any subsequent guidance/core suit of indicators. The Parties
develop the targets, measures and other arrangements that are devolved to the
Integration Joint Board. In developing this, the Parties share with the Integration
Page 246 of 290

Page 247

10 
Joint Board other relevant the Health Board and the Local Authority targets and
measures which the Integration Joint Board must take account of. 
9.3 The Parties, in conjunction with the Integration Joint Board also consider and
develop a list of targets, measures and arrangements that relate to the functions
that are not delegated which the Integration Joint Board must take account of when
it is preparing the Strategic Plan. 
9.4 The work in respect of 9.2 and 9.3 takes into account:
• The Outcomes
• Delegated performance targets related to the commissioning and
delivery accountabilities of the Health Board and the Local Authority;
• Delayed discharge
• Recovery activity
• Locally agreed Outcomes and targets identified through Community
Planning and from the Local Outcomes Improvement Plan and
attributable to Health and Social Care Outcomes and targets, including
Health Improvement, for each of the localities identified and agreed in
line with local needs determined for each population; and
• The Nationally prescribed core suite of integration indicators.
9.5  The reporting of information against this suite of indicators is provided by the Parties
to the Integration Joint Board as a means of measuring progress and impact. 
9.6 Where responsibility for the target is shared, the Parties set out in a document the
accountability and responsibility of each of them. 
9.7 Where the responsibility for the targets spans integrated and non-integrated services,
the Health Board, the Local Authority and the Integration Joint Board will work
together to produce and deliver the measures and targets which assess performance.
This will be evidenced through a standing performance item on Integration Joint
Board meetings and also picked up through the Integration Joint Board Annual
Performance report. 
9.8 The Integration Joint Board Performance, Finance and Audit Committee which is
accountable to the Integration Joint Board has been established as a decision making
body to provide further scrutiny on matters related to finance, risk, performance and
audit matters. 
10. Support, Care and Clinical Governance 
10.1 The Parties and the Integration Joint Board are accountable for ensuring
appropriate support, care and clinical governance arrangements are in place for
their duties under the Act. 
10.2 The Parties remain responsible for the support, care, clinical and professional
accountability of the services which the Integration Joint Board has directed the
Page 247 of 290

Page 248

11 
Parties to deliver and for the services delivered in respect of functions that are not
delegated to the Integration Joint Board. 
10.3 The Parties remain individually responsible for the assurance of the quality and
safety of services commissioned from the third and independent sectors in line
with the requirements set out within the Strategic Plan and any directions issued
by the Integration Joint Board that relate to or have an impact on, integrated and
non-integrated service provision. 
10.4 The Integration Joint Board will have regard to the support, care and clinical
framework that is set out in Section 6.6 when developing and agreeing its
Strategic Plan and corresponding directions to the Parties.
10.5 As set out in Section 9 the Integration Joint Board will receive regular reports
from professional leadership Members for medical; nursing, AHPs; and Social
Work to assure itself that support, care and clinical governance requirements are
being met through these existing arrangements and that safe, effective person
centred care is being consistently delivered.
11. Clinical and Professional Governance Framework 
11.1 The Parties have in place support, care and clinical governance arrangements to
provide assurance that the services that are delivered are safe, effective, person
centred and focussed on personal Outcomes. 
11.2 The Parties recognise that the establishment and continuous review of the
arrangements for support, care and clinical governance and Professional
Governance are essential in delivering their obligations and quality ambitions.
11.3 In the Health Board this is overseen by the Healthcare Quality Assurance and
Improvement Committee, a committee of the Health Board which supports the
Health Board in its responsibilities, with regards to issues of clinical risk, control
and governance and associated assurance in the area of quality assurance and
improvement through a process of constructive challenge.
11.4 The Healthcare Quality Assurance and Improvement Committee is responsible for
the development of a strategic approach to quality assurance and improvement
across the Health Board, ensuring that quality standards are being set, met and
continuously improved for clinical activity. It ensures that effective arrangements
for supporting, monitoring and reporting on quality assurance and improvement are
in place and working, demonstrating compliance with statutory requirements in
relation to clinical governance and authorising an accurate and honest annual
clinical governance statement.
11.5 In The Local Authority the Chief Social Work Officer holds professional
accountability for social work and social care services. The Chief Social Work
Officer reports directly to the Chief Executive and elected Members of the Local
Authority in respect of professional social work matters. He/she is responsible for
Page 248 of 290

Page 249

12 
ensuring that social work and social care services are delivered in accordance with
relevant legislation and that staff delivering such services do so in accordance with
the requirements of the Scottish Social Services the Local Authority.
11.6 The Parties are committed to developing a shared support, care and clinical
governance framework for integrated services. The professional leadership of the
Parties will work together to develop and agree this support, care and clinical
governance framework. In the first instance this will be based on a self-
assessment exercise to help identify areas of common practice, provide
opportunities to learn from one another and streamline processes.
11.7 The existing process, procedures and reporting structures for support, care and
clinical governance of integrated services will be reviewed in light of the agreed
support, care and clinical framework. The framework will encompass the following:
• Professional regulation, workload and workforce development
• Information assurance
• Service user experience and safety and quality of integrated service
delivery and personal Outcomes
• Person Centred Care
• Management of clinical risks; and
• Learning from adverse events.
11.8 Each of these domains will be underpinned by mechanisms to measure quality,
clinical and service effectiveness and sustainability. They will be compliant with
statutory, legal and policy obligations strongly underpinned by human rights values
and social justice. Service delivery will be evidence- based, underpinned by robust
mechanisms to integrate professional education, research and development. 
11.9 The Parties and the Integration Joint Board will be asked to approve the framework
and will then be responsible for ensuring that it is embedded within service planning,
delivery and performance reporting mechanisms. The Integration Joint Board will be
responsible for ensuring effective mechanisms for service user and carer feedback
and for complaints handling. 
11.10 The Area Clinical Forum, Managed Clinical Networks, GP Sub Committee, Area
Medical Committee; Medical Staff Committee and any other appropriate professional
groups, and the Adult Protection Committees will provide advice directly to the
Integration Joint Board or through its professional Members.
11.11 The Healthcare Quality Assurance and Improvement Committee and the Chief
Social Work Officer (or the appropriate delegates) will provide advice, oversight and
guidance to the North Lanarkshire Strategic Planning Group in respect of support,
care, clinical and professional governance, for the delivery of health and social care
services and to the localities identified in the Strategic Plan. 
11.12 The Chief Officer will have access to professional advice from the Chief Social
Work Officer of the local authority and the Medical Director and the Nursing Director
Page 249 of 290

Page 250

13 
of the Health Board in both their operational role as a senior officer of the parties
and as the accountable officer to the Integration Joint Board. 
11.13 Explicit lines of professional and operational accountability are essential to
assure the Integration Joint Board and the Parties of the robustness of governance
arrangements for their duties under the Act. They underpin delivery of safe, effective
and person centred care in all care settings delivered by employees of The Health
Board and The Local Authority and of the third and independent sectors. 
11.14 The Health Board is accountable for Clinical Governance. Professional
governance responsibilities are carried out by the professional leads through to the
health professional regulatory bodies and Scottish Ministers.
11.15 The Chief Social Work Officer in North Lanarkshire holds professional
accountability for social work and social care services. The Chief Social Work Officer
reports directly to the Chief Executive and elected Members of the Local Authority in
respect of professional social work matters. He/she is responsible for ensuring that
social work and social care services are delivered in accordance with relevant
legislation and that staff delivering such services do so in accordance with the
requirements of the Scottish Social Services the Local Authority. 
11.16 The Medical Director and/or the Director of Nursing, Midwifery and Allied Health
Professions, through delegated authority, hold professional accountability for the
delivery of safe and effective clinical services within The Health Board and report
regularly on these matters to the Health Board. 
11.17 The Integration Joint Board will have three health professional advisors. These
Members of the Integration Joint Board will be professionally accountable to the
Medical Director and the Nurse Director as appropriate. 
11.18 This arrangement does not limit the ability of the Medical Director and/or the
Nurse Director to provide advice directly to the Integration Joint Board. Where this
advice is offered, the Integration Joint Board must respond in writing and notify the
Parties. The Chief Social Work Officer can provide advice directly through their
Membership of the Integration Joint Board. 
11.19 The Chief Social Work Officer, through delegated authority holds professional
accountability for the delivery of safe and effective social work and social care
services within the Local Authority. An annual report on these matters will continue
to be provided to the relevant The Local Authority committee and will also be made
available to the Integration Joint Board. 
11.20 The Chief Social Work Officer will provide professional advice to the Integration
Joint Board in respect of the delivery of social work and social care services by The
Local Authority staff and commissioned care providers in North Lanarkshire.
12. Chief Officer
Page 250 of 290

Page 251

14 
12.1 The Integration Joint Board will appoint a Chief Officer in accordance with Section
10 of the Act. 
12.2 The Chief Officer reports to the Local Authority’s Chief Executive and the Health
Board ’s Chief Executive. The Chief Officer ’s formal contract of employment is with
one of the Parties and whichever holds the contract of employment, manages the
Chief Officer on a day to day basis.
12.3 The Chief Officer will be operationally responsible with regards to the delivery of
the delegated services (as set out in Annex 1 & 2) that do not relate to the acute
medicine and Accident and emergency services provided for within NHS
Lanarkshire Hospitals. These services will continue to be operationally managed by
the Health Board, through the Director of Acute Services, in line with the Integration
Joint Board’s Strategic Plan to ensure coherence across integrated and non-
integrated hospital service provision.
12.4 The Acute Director will be a single point of managerial responsibility for NHS
Lanarkshire hospitals. The Acute Director will provide updates to the Chief Officer
on the operational delivery of integrated functions delivered within the acute hospital
and the set aside budget on a regular basis.
12.5 The Chief Officer may also have responsibility for managing services that are
hosted by the Integration Joint Board across North and South Lanarkshire. These
arrangements will be determined by the North Integration Joint Board and the South
Lanarkshire Integration Joint Board through the Strategic Planning process.
12.6 The Chief Officer will be a member of the Corporate Management Teams of the
Health Board and Local Authority.
12.7 The Chief Officer will establish a senior management team to oversee day to day
operation of the integrated services.
12.8 The Chief Officer ’s objectives will be set annually. This will form the basis of the
Chief Officer ’s performance appraisal with the Local Authority’s Chief Executive
and the Chief Executive of the Health Board.
12.9 The Heads of Service will deputise for the Chief Officer as and when required. At
the request of the Integration Joint Board the Heads of Service will carry out the
functions of the Chief Officer if/when the Chief Officer is absent or otherwise
unable to carry out their functions.
12.10 The Chief Officer has established and maintains effective working relationships
with a range of key stakeholders across the Health Board, the Local Authority, the
third and independent sectors, services users and carers, the Scottish Government,
trade unions and relevant professional organisations.
12.11 Current hosted services arrangements are set out in Annex 3. However, with
regards to the future shaping of these services from a Strategic Planning
perspective, the Integration Joint Board discusses with relevant neighbouring
Page 251 of 290

Page 252

15 
Integration Joint Boards how these are shaped now and in the future. The Chief
Officer takes direction from the Integration Joint Board in respect of this.
13. Workforce 
13.1 Human resource services and workforce planning information will continue to be
provided by the appropriate corporate human resource functions within the Local
Authority and the Health Board.
13.2 The Parties, with the involvement of the Chief Officer, will identify appropriate
officers to develop a joint Workforce Development and Support Plan. In doing so
the officers will be required to consider professional views and previous workforce
modelling etc. However, there may be opportunities to adapt these plans when
considering an integrated workforce. This will also have to build in consideration
around Third Sector and Independent Sector capacity. The Workforce
Development and Support plan will be regularly updated to ensure it remains
contemporary. 
13.3 An Organisational Development strategy (“OD Strategy”) will be maintained in
relation to teams who will deliver integrated services. Through an intense focus on
locality modelling, locality based focus groups and action learning sets, we have
identified significant potential for harnessing the positivity and enthusiasm of
frontline staff to achieve better Outcomes for the public, the organisation and the
staff. We intend to continue this process combined with other aspects of our plan
which focuses on:
• Integration Joint Board Development
• Key Leaders Development Programme
• Integrated Locality Team Development; and
• Wider Stakeholder Development. 
13.3.1 In all cases, we will endeavour where appropriate, to carry out development
work which is inclusive of all partners. Considerable progress has been made to
develop an OD strategy, but it will need to be reviewed and revised over time. The
Integration Joint Board will be given the opportunity to provide comment on the draft
strategy upon its establishment. The strategy will be updated over the period of the
Strategic Planning process.
13.4 Joint HR/OD processes have been agreed by the Parties over a number of years
and many joint policies already exist which will assist in the process of integration.
This Scheme has no effect on these joint policies so, for example, any joint
appointments will continue to report to one-line manager, except for the Chief Officer
where different provision is made within this scheme.
14. Finance
Page 252 of 290

Page 253

16 
14.1 Contributions from the Parties for delegated functions to the Integration Joint
Board will be overseen by the Chief Officer and the Integration Joint Board Chief
Financial Officer. They will develop a resource plan and budget based on
available resources. The Integration Joint Board Chief Financial Officer will be
responsible for the preparation of the annual financial statements as required by
Section 39 of the Act. 
14.2 The Chief Officer and Chief Financial Officer will develop an Integrated Budget
based on the Strategic Plan and present it to the parties for consideration as part
of both of their annual budget setting processes. The Parties will evaluate the
case for the Integrated Budget against their other priorities and will agree their
respective contributions accordingly. The outcome of this work will be presented to
the Integration Joint Board. Following on from the budget process, the Chief
Officer and the Integration Joint Board Chief Financial Officer will prepare a
financial plan supporting the Strategic Plan. 
14.3 The budget will be evidenced based with transparency of assumptions including,
but not limited to pay award, contractual uplift, savings requirements etc. 
14.3.1 The method for determining the amount set aside for hospital services will follow
guidance issued by the Integrated Resources Advisory Group and be based initially
on the notional direct costs of the relevant populations use of in scope hospital
services as provided by Information Services Division (ISD) Scotland. The NHS
Director of Finance and Integration Joint Board Chief Financial Officer will keep
under review developments in national data sets or local systems that might allow
more timely or more locally responsive information, and if enhancements can be
made, propose this to the Integration Joint Board. If the Strategic Plan sets out a
change in hospital capacity, the resource consequences will be determined through
a bottom up process based on: 
• Planned changes in activity and case mix due to interventions in the
Strategic Plan
• Projected activity and case mix changes due to changes in population
need; and
• Analysis of the impact on the affected hospital budget, taking into
account cost-behaviour i.e. fixed, semi fixed and variable costs and
timing difference i.e. the lag between reduction in capacity and the
release of resources.
14.4 Each partner will agree the formal budget setting timelines and reporting periods
as defined in the Financial Regulations. 
14.5 A schedule of notional payments will be provided by the Parties to the Integration
Joint Board following the approval of the Strategic Plan and the financial Plan. 
14.6 It will remain the duty of the Local Authority Section 95 Officer and the Health
Board Accountable Officer to monitor and regulate the financial performance of
Page 253 of 290

Page 254

17 
their respective share of the resources available to the Integration Joint Board
during each reporting period, throughout the financial year. 
14.7 It will be the responsibility of the Local Authority Section 95 Officer and the Health
Board Accountable Officer to comply with the agreed reporting timetable and to
make available to the Integration Joint Board Chief Financial Officer the relevant
financial information, including the sum set aside in line with 9.4.15, required
for timely financial reporting to the Integration Joint Board. This will include such
details as may be required to inform financial planning of revenue expenditure. 
14.8 The frequency of reporting is set out in the Financial regulations and will be at
least on a quarterly basis. In advance of each financial year a timetable for
financial reporting will be submitted to the Integration Joint Board for approval. 
14.9 Regular management reports will be prepared in line with the financial regulations
which will be agreed by the Integration Joint Board, and will include actual and
projected outturns. The existing budgetary control frameworks adopted by each of
the Parties will form the basis of generating the required information. 
14.10 The Integration Joint Board Chief Financial Officer will manage the respective
financial plan so as to deliver the agreed Outcomes within the Strategic Plan viewed
as a whole. 
14.11 The Parties do not expect that there will be a schedule of cash payments, but
rather annual accounting entries for the agreed budgets. There may be a
requirement for an actual cash transfer to be made between the Parties to
reflect the difference between the payment being made and the resources
delegated to the party by the Integration Joint Board. Any cash transfer will take
place at least annually. Any change to frequency will be jointly agreed by the
Integration Joint Board and the Parties. 
14.12 The process for managing any in-year financial variations will be detailed within
the Financial regulations and are summarised below: 
14.12.1 If the Integration Joint Board’s Chief Financial Officer is advised that a
significant change is likely to the Integration Joint Board's overall financial position
and the deviation involves a change of policy of the Integration Joint Board or results
in revenue implications for future years, a report will be provided for the Integration
Joint Board in good time detailing the financial consequences to enable appropriate
action to be taken timeously. 
14.12.2 If an overspend is forecast on either Parties in scope budget, the Chief Officer
and the Integration Joint Board’s Chief Financial Officer will aim to agree a recovery
plan with the relevant Party to balance the overspending budget and determine the
actions required to be taken to deliver the recovery plan. If the overspend arises
from assumptions in the Integration Joint Board’s Strategic Plan on the impact of
service changes that are not realised as anticipated this should be subject to a report
and corrective action. This corrective action may include a recovery plan
Page 254 of 290

Page 255

18 
which should consider revisions to the commissioning of services and / or financial
plans to account for the changed circumstances, and the use of any available
reserves. 
14.12.3 If the recovery plan is unsuccessful then the parties have the following options: 
• the relevant partner provides additional resources to the Integration Joint
Board which is then recovered in future years from subsequent
underspends in that partner’s contribution, (subject to scrutiny of the
reasons for the overspend and assurance that there is a plan in place to
address this); or
• the relevant partner makes additional one-off adjustment to the
resources that it is making available to the Integration Joint Board.
14.12.4 Unplanned underspends that arise due to material differences between
assumptions used in setting the budget and actual events effectively represent an
overfunding by the Parties with respect to planned Outcomes. The circumstances
surrounding the action required to address unplanned underspends is set out in the
Financial regulations and Reserves Policy, which will be subject to agreement by
the Parties and the Integration Joint Board. The options will include the underspend
either being returned to the relevant party in year through an adjustment to their
respective contributions, or maintained by the Integration Joint Board to be carried
through the General fund balance. 
14.13 The Parties do not expect to reduce the in-year payment, or the services
delegated to the Integration Joint Board without the consent of the Integration Joint
Board and the other Party out with the following circumstances: 
• Unplanned underspends as defined above and the Financial regulations
and Reserves Policy; or
• Where the budget assumed a specific allocation from the Scottish
Government which did not materialise in year to the extent anticipated.
(The converse of this also applies in that should a specific allocation
pertaining to a delegated function exceed the anticipated level, an
additional payment to the Integration Joint Board may be agreed).
14.14 Monitoring arrangements will include the impact of activity on set aside budgets. 
14.15 The Accounting Standards as adapted for the public sector will apply to the
Integration Joint Board. The Code of Practice on Local Authority Accounting in the
UK will be the applicable guidance for their interpretation. 
14.16 The financial statements of the Integration Joint Board will be completed to meet
the audit and publication timetable specified in regulations (Regulations under
Section 105 of the Local Government (Scotland) Act 1973). 
14.17 Initially, recording of financial information in respect of the Integration Joint Board
will be processed via the Local Authority ledger. The means for recording financial
Page 255 of 290

Page 256

19 
information will be reviewed by the Chief Financial Officer to ensure this method
remains appropriate giving due regard to the needs of the Integration Joint Board.
Should an amendment to this method be required the Chief Financial Officer will
consult with both parties and present recommendations to the Integration Joint
Board for approval. 
14.18 The financial ledger transactions relating to the Integration Joint Board will be
carried out prior to the end of the financial year with post year-end adjustments for
material information only. Year-end balances and transactions will be agreed
timeously in order to allow completion of the Accounts in line with required
timescales. This date will be agreed annually by the Integration Joint Board and the
Parties.
14.19 From an asset management and capital planning perspective, in the short term,
the Integration Joint Board will not be empowered to own capital assets and the
regimes of the Parties will apply to capital assets used to provide the delegated
services. Ownership of assets and associated liabilities will remain with the Parties. 
14.20 The Chief Officer will consider all of the resources which are required to deliver
the integration Outcomes including the relevant non-current assets owned by the
Parties. The Chief Officer will consult with the Parties to make best use of existing
resources. 
14.21 Should the Integration Joint Board believe there is a requirement to develop
assets in order to facilitate the delivery of the Strategic Plan ’s Outcomes, then the
Chief Officer must present a business case to the Parties for consideration. This
should be submitted as part of the partner’s capital planning process. Partnership
discussion would be required at an early stage for jointly funded projects. 
14.22 Detailed Financial regulations governing the Integration Joint Board will be
agreed between the Parties and approved by the Integration Joint Board before
functions and resources are delegated.
15. Communication, Participation and Engagement 
15.1 Communication, participation and engagement with all stakeholders is central to
the development of the Scheme and is stated requirements as outlined in Section 6
(2) of the Act. The stakeholders who have been directly engaged with to date
include:
• Health & Social Care Professionals;
• Service Users & Carers;
• Non Commercial Providers of Health & Social Care;
• Non Commercial Providers of Housing;
• Independent Sector;
• Third Sector;
• Staff likely to be affected by the integration; and
Page 256 of 290

Page 257

20 
• Other Local Authorities operating within the area of the Health Board.
15.2 The Parties have well-established local arrangements for involving and engaging with
service users, carers, patients and communities. These have become embedded
within North Lanarkshire and include the Public Partnership Forum. North Lanarkshire
Integration Joint Board collaborates with the nationally recognised Third Sector
Interface, and as such provides a seat on the IJB in order to develop and coordinate
activity with third sector partners. 
15.3 This public engagement activity will adhere to national standards for community
engagement and participation.
15.4 The Integration Joint Board has an existing participation and engagement plan,
supported via access to the corporate/directorate communication teams of both parties
and a dedicated Communications Officer and support from staff who work directly in
the field of community engagement/public involvement. 
15.5 In preparing its Strategic Plan, the Integration Joint Board has established
mechanisms to seek the views of key stakeholders, including a Strategic Planning
group in accordance with the requirements of the Act. 
16. Information-Sharing and Data Handling 
16.1 The Parties agree to continue to operate under the existing Lanarkshire Information
Sharing Protocol and the agreed procedures for sharing information, which is
governed by the Lanarkshire Data Sharing Partnership, until such time as any
necessary changes are made by the process outlined below. The Lanarkshire Data
Sharing Partnership Board is the key multi-agency forum with current partnership
arrangements and includes representation from the Local Authority, South
Lanarkshire Council and the Health Board, Police Scotland, Fire Service and Third
Sector. All staff employed by the Parties will continue to comply with all current polices
and protocols with regards to information sharing. 
16.2 The protocol and procedures for sharing information will be regularly reviewed
and updated to reflect the new governance arrangements that pertain to health
and social care by the Lanarkshire Data Sharing Partnership. The Chief Officer of
the Integration Joint Board chairs the Local Data Sharing Partnership: and the
revised protocol has been provided to the Parties and the Integration Joint Board. 
16.3 The Lanarkshire Information Sharing Protocol is reviewed regularly by the
Lanarkshire Data Sharing Partnership. If the Parties or the Integration Joint Board
have concerns about the Lanarkshire Information Sharing Protocol or agreement,
or the processes for sharing information, they may request a review. Any such
changes or amendments must be agreed by the Integration Joint Board and the
Parties.
Page 257 of 290

Page 258

21 
16.4 It is the intention to ensure that any resultant information sharing agreement will
be established and maintained within legislative or regulatory requirements in
place at that time, primarily with respect to confidentiality, data protection and
privacy. 
16.5 The Parties entered into an information sharing protocol (Scottish Accord on the
Sharing of Personal Information) in relation to health and social care integration,
primarily to support Strategic Planning, commissioning and service design.
17. Complaints 
17.1 The Parties agree the following arrangements in respect of complaints by service
users and those complaining on behalf of service users. 
17.2 The Parties agree that feedback, comments, concerns and complaints should be
viewed with a positive attitude and valued as feedback on service performance
leading to a culture of learning from complaints.
17.3 The Parties agree the principle of frontline resolution to complaints wherever
possible and have existing mechanisms in place to achieve this.
17.4 The Parties agree that irrespective of the point of contact the Parties will show a
willingness to appropriately direct complaints to ensure an appropriate response.
17.5 Due to different legislative requirements the Parties agree that complaints will
continue to be dealt with according to the procedures and policies in place for the
Local Authority and the Health Board.
17.6 Where complaints cross the boundaries of health and social care the Parties will
work together to achieve, where possible, a joint response to a complaint.
17.7 The Parties agree that complaints by patients, service users or carers will be
managed and responded to by the lead organisation responsible for the delivery of
the service to which the complaint refers in accordance with the procedures and
policies in place for that Party, completed within the timescales for the relevant
procedure and monitored by the Chief Officer.
17.8 There are two established processes a complaint will follow depending on the lead
organisation, these are the Statutory Social Work Complaints process; and the
health Board’s complaints process.
17.9 These processes, together with the timescales for acknowledgement and response,
are widely publicised by the respective organisations. Complaints to the Local
Authority can be made through their website Make a complaint | North  Lanarkshire 
Council using the online form or by telephoning the Local Authority. The
arrangements for making complaints to the Health Board are set out on their website
Page 258 of 290

Page 259

22 
Complaints | NHS Lanarkshire (scot.nhs.uk) or can be made by telephoning the Health
Board.
17.10 External service providers are required to have a complaints procedure in place.
Where complaints are received that relate to a service provided by an external
service provider the lead organisation will either arrange for investigation or refer the
complainant to the external service provider for resolution of their complaint.
17.11 All complaints will be investigated and responded to according to the lead
organisation’s procedure, completed within the timescales for the relevant procedure
and monitored by the Chief Officer. 
17.12 The Chief Officer will have an overview of complaints related to integrated
functions and will provide a commitment to joint working, wherever necessary,
between the Parties when dealing with complaints about integrated services.
17.13 If a complaint remains unresolved through the defined complaints-handling
procedure, complainants will be informed of their right to go either to the Scottish
Public Services Ombudsman for services provided by the Health Board, or to the
Social Work Complaints Review Committee following which, if their complaints
remains unresolved, they have the right to go to the Scottish Public Services
Ombudsman for services provided by the Local Authority.
17.14 This arrangement will respect the statutory complaints-handling processes
currently in place for health and social care services. This arrangement will benefit
service users and carers by making use of existing complaints procedures and will
not create an additional complaint handling process.
17.15 Data sharing requirements relating to any complaint will follow the Information and
Data sharing protocol set in the Information and Data Handling Section of this
Scheme.
17.16 Relevant performance information and lessons learned from complaints will be
collected and reported in line with the support, care and clinical governance Section
of this Scheme.
17.17 A joint performance report will be produced annually for consideration by the
Integration Joint Board.
18. Claims Handling, Liability and Indemnity 
18.1 The Parties and the Integration Joint Board recognise that they could receive a claim
arising from or which relates to the work undertaken on behalf of the Integration Joint
Board. 
18.2 The Parties agree to ensure that any such claims are progressed quickly and in a
manner which is equitable between them.
Page 259 of 290

Page 260

23 
18.3 So far as reasonably practicable the normal common law and statutory rules relating
to liability will apply, however it is also noted that decisions relating to claims and
liabilities will also be subject to any requirements, obligations or conditions of any
relevant insurance policies held by the Parties. 
18.4 In the event of any claim against the Integration Joint Board in respect of which it is
not clear which Party should assume responsibility, the Chief Officer (or his/her
representatives) will liaise with the Chief Executives of the Parties (or their
representatives) to determine which Party should assume responsibility for
progressing the claim.
18.5 Where a claim has been settled by one of the Parties, and it thereafter transpires that
liability (in whole or in part) should have rested with the other Party, then that Party
shall indemnify the Party that settled the claim. 
18.6 Claims regarding policy and/or strategic decisions made by the Integration Joint Board
shall be the responsibility of the Integration Joint Board. For such claims, the
Integration Joint Board will require to assess the need for, and if appropriate, obtain
appropriate insurance cover. It may also require to engage independent legal advice. 
18.7 If a claim has a “cross boundary” element whereby it relates to another Integration
authority area, the Chief Officer s of the Integration authorities concerned shall liaise
with each other until an agreement is reached as to how the claim should be
progressed and determined. 
18.8 Each Party will ensure that appropriate risk financing arrangements are put in place
and maintained, to meet the cost of claims and other associated costs. 
18.9 Claims which pre-date the establishment of the Integration Joint Board will be dealt
with by the Parties through the procedures that were in place prior to Integration. 
19. Risk Management 
19.1 The Parties and the Integration Joint Board have an agreed risk management
strategy and methodology in relation to Health & Social Care Integration. The
shared strategy and methodology ensures: 
• Identification, assessment, prioritisation and pro-active management of
risk related to the delivery of services, particularly those which are likely
to affect the Integration Joint Board's delivery of the Strategic Plan
• Identification and description of processes for mitigating these risks
• Mechanisms in place for risk sharing between the organisations; and
• Agreed reporting standards. 
19.2 The risk management strategy and methodology sets out: 
• Roles and Responsibilities for managing risk
Page 260 of 290

Page 261

24 
• How the Parties and the Integration Joint Board prepare risk registers,
and arrangements to amend and update such registers
• Risks that should be reported from the date of delegation of functions
and Resources
• An agreed risk monitoring framework
• An agreed risk reporting framework to senior management and those
charged with governance
• An agreed process for sharing risks between partners
• The process for agreeing changes with the Integration Joint Board; and
• Protocols for communication and sharing risk information between the
Parties.
19.3 The Parties and the Integration Joint Board will work collectively to support
three risk registers:
• IJB strategic register
• The Health Board’s operational register for health services, as part of the
Health Board’s corporate risk processes; and
• The Local Authority operational register for social work services, as part
of the Local Authority’s corporate risk processes.
19.4 The Integration Joint Board regularly reviews and updates its Risk Register,
with more detailed analysis through the Performance, Finance and Audit Sub
Committee. 
19.5 In addition to the above, the Health Board, the Local Authority and Integration
Joint Board will consider and agree which risks should be taken from their own
risk registers and placed on the shared risk register. Where these risk change, the
Health Board, the Local Authority and Integration Joint Board will notify each other
of where they have changed. This will be done formally through the Risk Register
reports to Integration Joint Board and its Finance, Performance and Audit Sub
Committee. 
19.6 A risk sharing form has been agreed with both partners so that joint risks can be
identified and shared timeously. 
20. Dispute Resolution Mechanism 
20.1 In the event of a failure by the Parties to reach agreement between themselves in
relation to any aspect of this Scheme or any of the duties or powers placed on
them by the Act then they will follow the process laid out below:
20.2 Either Party can invoke this Dispute Resolution Mechanism by serving written
notice of their intention to do so on the other Party. Such notice will be deemed to
be received on the day following the issuing of the notice. The date following the
issuing of the notice is herein referred to as “the relevant date”.
Page 261 of 290

Page 262

25 
20.3 The Chief Executives of the Health Board and the Local Authority will meet,
within 7 days of the relevant date, to attempt to resolve the issue. 
20.4 If unresolved, and within 21 days of the relevant date, the Parties will each
prepare a written note of their position on the issue and exchange it with the each
other. 
20.5 In the event that the issue remains unresolved, representatives of the Parties
will proceed to mediation with a view to resolving the issue.
20.6 Within 28 days of the relevant date, duly authorised representatives of the Parties
will meet with a view to appointing a suitable independent person to act as a
mediator. If agreement cannot be reached, then a referral will be made to the
President of the Law Society of Scotland inviting the President to appoint a person
to act as mediator. The mediation process shall be determined by the mediator
appointed and shall take place within 28 days of the mediator accepting
appointment. 
20.7 Where the issue remains unresolved after following the processes outlined
above, the Parties agree that they will notify Scottish Ministers that agreement
cannot be reached. 
20.8 The notification will explain the nature of the dispute and the actions taken to try to
resolve the dispute including any written opinion or recommendations issued by
the mediator. 
20.9 The Parties agree to be bound by this determination of this dispute resolution
mechanism.
Page 262 of 290

Page 263

26 
Annex 1 – Delegated Functions
Part 1
Functions delegated by the Health Board to The Integration Joint Board
Set out below is the list of functions that will be delegated by The Health Board to the
Integration Joint Board as set out in the Public Bodies (Joint Working) (Prescribed
Health Board Functions) (Scotland) Regulations 2014. 
Functions prescribed for the purposes of Section 1(8) of the Act 
Column A
Enactment conferring function
Column B
Limitation 
The National Health Service (Scotland) Act 1978
All functions of Health Boards
conferred by, or by virtue of, the
National Health Service (Scotland)
Act 1978
Except functions conferred by or by virtue
of—
Section 2(7) (Health Boards); 
Section 2CB (Functions
Boards outside
Scotland);
of Health 
Section 9 (local consultative committees); 
Section 17A (NHS Contracts); 
Section 17I (use of accommodation); 
Section 17J (Health Boards’ power to
enter into general medical services
contracts); 
Section 28A (remuneration for Part II
services); 
Section 38A (breastfeeding); 
Section 39 (medical and dental inspection,
supervision and treatment of pupils and
young persons); 
Section 48 (provision of residential and
practice accommodation); 
Section 55 (hospital accommodation on
part payment);
Page 263 of 290

Page 264

27 
Section 57 (accommodation and services
for private patients);
Section 64 (permission for use of facilities
in private practice);
Section 75A (remission and repayment of
charges and payment of travelling
expenses);
Page 264 of 290

Page 265

28 
Section 75B (reimbursement of the
cost of services provided in another
EEA state);
Section 75BA (reimbursement of the
cost of services provided in another
EEA state where expenditure is
incurred on or after 25 October 2013);
Section 79 (purchase of land and
moveable property);
Section 82 use and administration of
certain endowments and other
property held by Health Boards);
Section 83 (power of Health Boards
and local health the Local Authorities
to hold property on trust);
Section 84A (power to raise money,
etc., by appeals, collections etc.);
Section 86 (accounts of Health
Boards and the Agency);
Section 88 (payment of allowances
and remuneration to Members of
certain bodies connected with the
health services);
Section 98 (charges in respect of
non- residents); and
paragraphs 4, 5, 11A and 13 of
Schedule 1 to the Act (Health
Boards);
and functions conferred by—
The National Health Service (Charges
to Overseas Visitors) (Scotland)
Regulations 1989
;
The Health Boards (Membership
and Procedure) (Scotland)
Regulations 2001
Page 265 of 290

Page 266

29 
The National Health Service (Clinical
Negligence and Other Risks Indemnity
Scheme) (Scotland) Regulations 2000;
The National Health Services (Primary
Medical Services Performers Lists)
(Scotland) Regulations 2004
The National Health Service (Primary
Medical Services Section 17C
Agreements) (Scotland) Regulations
2018;
The National Health Service
(Discipline Committees)
Regulations 2006
;
The National Health Service (General
Ophthalmic Services) (Scotland)
Regulations 2006
Page 266 of 290

Page 267

30 
The National Health Service
(Pharmaceutical Services) (Scotland)
Regulations 2009 
The National Health Service (General
Dental Services) (Scotland) Regulations
2010 and 
The National Health Service (Free
Prescription and Charges for Drugs
and Appliances) (Scotland)
Regulations 2011.
Disabled Persons (Services, Consultation and Representation) Act 1986
Section 7
(Persons discharged from hospital) 
Community Care and Health (Scotland) Act 2002
All functions of Health Boards
conferred by, or by virtue of, the
Community Care and Health
(Scotland) Act 2002. 
Mental Health (Care and Treatment) (Scotland) Act 2003
All functions of Health Boards
conferred by, or by virtue of, the Mental
Health (Care and Treatment)
(Scotland) Act 2003.
Except functions conferred by—
Section 22 (Approved medical
practitioners); 
Section 34 (Inquiries under Section 33:
co-operation);  
Section 38 (Duties on hospital
managers: examination notification
etc.); 
Section 46 (Hospital managers’
duties: notification); 
Section 124 (Transfer to other hospital);
Page 267 of 290

Page 268

31 
Section 228 (Request for assessment
of needs: duty on local authorities and
Health Boards);
Section 230 (Appointment of a patient’s
responsible medical officer);
Section 260 (Provision of information
to patients);
Section264 (Detention in
conditions of excessive
security: state hospitals);
Section 267 (Orders under Sections
264 to 266: recall);
Page 268 of 290

Page 269

32 
Section 281 (Correspondence of certain
persons detained in hospital); 
and functions conferred by— 
The Mental Health (Safety and
Security) (Scotland) Regulations 2005; 
The Mental Health (Cross Border
transfer: patients subject to detention
requirement or otherwise in hospital)
(Scotland) Regulations 2005; 
The Mental Health (Use of Telephones)
(Scotland) Regulations 2005; and 
The Mental Health (England and
Wales Cross border transfer: patients
subject to detention requirement or
otherwise in hospital) (Scotland)
Regulations 2008.
Education (Additional Support for Learning) (Scotland) Act 2004
Section 23
(other agencies etc. to help in exercise
of functions under this Act) 
Public Services Reform (Scotland)
Act 2010 
All functions of Health Boards
conferred by, or by virtue of, the Public
Services Reform (Scotland) Act 2010
Except functions conferred by—
Section 31(Public functions: duties to
provide information on certain
expenditure etc.); and 
Section 32 (Public functions: duty to
provide information on exercise of
functions).
Patient Rights (Scotland) Act 2011 
All functions of Health Boards
conferred by, or by virtue of, the
Patient Rights (Scotland) Act 2011
Except functions conferred by The
Patient Rights (Complaints Procedure
and Consequential Provisions)
(Scotland) 
Regulations 2012 
Page 269 of 290

Page 270

33 
Part 2- Integrated Services
Services currently provided by the Health Board which are to be integrated
The functions that are set out in Part 1 are delegated in relation to the services as
set out below and relate to both adults and children. 
Interpretation
1. In this part—
“Allied Health Professional” means a person registered as an allied health
professional with the Health Professions the Local Authority;
“general medical practitioner” means a medical practitioner whose name is included
in the General Practitioner Register kept by the General Medical the Local Authority;
“general medical services contract” means a contract under Section 17J of the
National Health Service (Scotland) Act 1978;
“hospital” has the meaning given by Section 108(1) of the National Health Service
(Scotland) Act 1978;
“inpatient hospital services” means any health care service provided to a patient
who has been admitted to a hospital and is required to remain in that hospital
overnight, but does not include any secure forensic mental health services;
“out of hours’ period” has the same meaning as in regulation 3 of the National Health
Service (General Medical Services Contracts) (Scotland) Regulations 2018; and
“the public dental service” means services provided by dentists and dental staff
employed by a health board under the public dental service contract. 
Services
2. Accident and emergency services provided in a hospital.
3. Inpatient hospital services relating to the following branches of medicine—
(a) general medicine;
(b) geriatric medicine;
(c) rehabilitation medicine;
(d) respiratory medicine; and
(e) psychiatry of learning disability.
4. Palliative care services provided in a hospital.
5. Inpatient hospital services provided by general medical practitioners.
6. Services provided in a hospital in relation to an addiction or dependence on any
substance.
7. Mental health services provided in a hospital except regionally or nationally
organised forensic mental health services
8. District nursing services.
9. Services provided out with a hospital in relation to an addiction or dependence on
any substance
10. Services provided by allied health professionals in an outpatient department,
clinic, or out with a hospital.
11. The public dental service.
12. Primary medical services provided under a general medical services contract,
and arrangements for the provision of services made under Section 17C of the
Page 270 of 290

Page 271

34 
National Health Service (Scotland) Act 1978, or an arrangement made in
pursuance of Section 2C (2) of the National Health Service (Scotland) Act 1978.
13. General dental services provided under arrangements made in pursuance of
Section 25 of the National Health (Scotland) Act 1978.
14. Ophthalmic services provided under arrangements made in pursuance of
Section 17AA or Section 26 of the National Health Service (Scotland) Act 1978.
15. Pharmaceutical services and additional pharmaceutical services provided
under arrangements made in pursuance of Sections 27 and 27A of the National
Health Service (Scotland) Act 1978.
16. Services providing primary medical services to patients during the out-of-hours
period.
17. Services provided out with a hospital in relation to geriatric medicine.
18. Palliative care services provided out with a hospital.
19. Community learning disability services.
20. Mental health services provided out with a hospital.
21. Continence services provided out with a hospital.
22. Kidney dialysis services provided out with a hospital.
23. Services provided by health professionals that aim to promote public health.
24. Health visiting Services – denotes that this is in addition to the statutory list as
outlined in points 8-23 above.
Page 271 of 290

Page 272

35 
Annex 2 - Part 1 - Functions delegated by the Local Authority
to the Integration Joint Board
Set out below is the list of functions that will be delegated by The Local Authority to
the Integration Joint Board. 
Schedule Regulation 2
Part 1
Functions prescribed for the purposes of Section 1(7) of the Public Bodies (Joint
Working) (Scotland) Act 2014 
Column A
Enactment conferring function
Column B
Limitation
National Assistance Act 1948 
Section 48
(Duty of the Local Authorities to
provide temporary protection for
property of persons admitted to
hospitals etc.) 
Section 45
(Recovery in cases of
misrepresentation or non-
disclosure.).) 
The Disabled Persons
(Employment) Act 1958 
Section 3
(Provision of sheltered employment by
local authorities) 
The Social Work (Scotland) Act 1968 
Section 1
(Local authorities for the administration
of the Act.)
So far as it is exercisable in relation to
another integration function.
Section 4
(Provisions relating to performance of
functions by local authorities.)
Section 5
(Powers of Secretary of State.)
So far as it is exercisable in relation to
another integration function.
Page 272 of 290

Page 273

36 
Section
8
(Researc
h.)
So far as it is exercisable in relation to
another integration function.
Page 273 of 290

Page 274

37 
Column A
Enactment conferring function
Column B
Limitation
Section 10
(Financial and other assistance to
voluntary organisations etc. for social
work.)
So far as it is exercisable in relation to
another integration function.
Section 12
(General social welfare services of
local authorities.)
Except in so far as it is exercisable in
relation to the provision of housing
support services.
Section 12A
(Duty of local authorities to assess
needs.)
So far as it is exercisable in relation to
another integration function.
Section 12AZA
(Assessments under Section 12A -
assistance)
So far as it is exercisable in relation to
another integration function.
Section 13
(Power of local authorities to assist
persons in need in disposal of produce
of their work.) 
Section 13ZA
(Provision of services to incapable
adults.)
So far as it is exercisable in relation to
another integration function.
Section 13A
(Residential accommodation with
nursing.) 
Section 13B
(Provision of care or aftercare.) 
Section 14
(Home help and laundry facilities.) 
Page 274 of 290

Page 275

38 
Column A
Enactment conferring function
Column B
Limitation
Section 29
(Power of local authority to defray
expenses of parent, etc., visiting
persons or attending funerals.)
Section 59 So far as it is exercisable in relation to
another integration function.
(Provision of residential and other
establishments by local authorities and
maximum period for repayment of
sums borrowed for such provision.)
Section 78A
(Recovery of contributions) 
Section 80
(Enforcement of duty to make
contributions.)
Section 81
(Provisions as to decrees for ailment.)
Section 83
(Variation of
trusts.) 
Section 86
(Adjustment between authority
providing accommodation etc., and
authority of area of residence.)
The Local Government and Planning (Scotland) Act 1982
Section 24(1)
(The provision of gardening assistance
for the disabled and the elderly.)
Page 275 of 290

Page 276

39 
Health and Social Services and Social Security
Adjudications Act 1983
Section 21
(recovery of sums due to local authority where persons in residential
accommodation have disposed of
assets.) 
Section 22
(Arrears of contributions charged on interest in land in England and Wales) 
Section 23
(Arrears of contributions secured over interest in land in Scotland)
Disabled Persons (Services, Consultation and Representation) Act 1986
Section 2
(Rights of authorised
representatives
of disabled persons.)
Page 276 of 290

Page 277

40 
Column A
Enactment conferring function
Column B
Limitation
Section 3
(Assessment by local authorities of
needs of disabled persons.) 
Section 7 In respect of the assessment of need
(Persons discharged from hospital.) for any services provided under 
functions contained in welfare 
enactments within the meaning of 
Section 16 and  which have  been 
delegated.
Section 8 In respect of the assessment of need
(Duty of local authority to take into for any services provided under
account abilities of carer.) functions contained in welfare 
enactments (within the meaning set 
out in Section 16 of that Act) which are 
integration functions. 
The Adults with Incapacity (Scotland) Act 2000
Section 10
(Functions of local authorities.) 
Section 12
(Investigatio
ns.) 
Section 37
(Residents whose affairs may be
managed.)
Only in relation to residents of
establishments which are managed
under integration functions.
Section 39
(Matters which may be managed.)
Only in relation to residents of
establishments which are managed
under integration functions.
Section 40
(Supervisory
bodies.) 
Section 41
(Duties and functions of managers of
authorised establishment.)
Only in relation to residents of
establishments which are managed
under integration functions
Section 42
(Authorisation of named manager to
withdraw from resident’s account.)
Only in relation to residents of
establishments which are managed
under integration functions
Page 277 of 290

Page 278

41 
Section 43
(Statement of resident’s affairs.)
Only in relation to residents of
establishments which are managed
under integration functions
Section 44
(Resident ceasing to be resident of
authorised establishment.)
Only in relation to residents of
establishments which are managed
under integration functions
Section 45
(Appeal, revocation etc.)
Only in relation to residents of
establishments which are managed
under integration functions
Page 278 of 290

Page 279

42 
Column A
Enactment conferring function
Column B
Limitation
The Housing (Scotland) Act 2001 
Section 92
(Assistance to a registered for
housing purposes.)
Only in so far as it relates to an aid or
adaptation.
The Community Care and Health (Scotland) Act 2002
Section 5
(Local authority arrangements for of
residential accommodation out with
Scotland.) 
Section 6
Deferred payment of accommodation
costs.) 
Section 14
(Payments by local authorities towards
expenditure by NHS bodies on
prescribed functions.)
The Mental Health (Care and Treatment) (Scotland) Act 2003
Section 17
(Duties of Scottish Ministers, local
authorities and others as respects
Commission.) 
Section 25
(Care and support services etc.)
Except in so far as it is exercisable in
relation to the provision of housing
support services.
Section 26
(Services designed to promote well-
being and social development.)
Except in so far as it is exercisable in
relation to the provision of housing
support services.
Section 27
(Assistance with travel.)
Except in so far as it is exercisable in
relation to the provision of housing
support services.
Section 33
(Duty to inquire.) 
Section 34
(Inquiries under Section 33: Co-
operation.) 
Page 279 of 290

Page 280

43 
Section 228
(Request for assessment of needs:
duty on local authorities and Health
Boards.)
Page 280 of 290

Page 281

44 
Column A
Enactment conferring function
Column B
Limitation
Section
259
(Advocac
y.) 
The Housing (Scotland) Act
2006 
Section 71(1)(b)
(Assistance for housing
purposes.)
Only in so far as it relates to an aid or
adaptation.
The Adult Support and Protection (Scotland) Act 2007
Section 4
(The Local Authority’s duty to
make inquiries.) 
Section 5
(Co-operation.) 
Section 6
(Duty to consider importance of
providing advocacy and other.) 
Section
7
(Visits)
Section 8
(Interview
s)
Section 9
(Medical examinations) 
Section 10
(Examination of records etc.)
Section 11
(Assessment
Orders.) 
Section 14
(Removal
orders.) 
Page 281 of 290

Page 282

45 
Section 16
(Right to remove adult at risk)
Section 18
(Protection of moved persons’
property.)
Section 22
(Right to apply for a banning
order.)
Section 40
(Urgent
cases.)
Section 42
(Adult Protection Committees.)
Page 282 of 290

Page 283

46 
Column A
Enactment conferring function
Column B
Limitation
Section 43
(Membershi
p.) 
Social Care (Self-directed Support) (Scotland) Act 2013 
Section 5
(Choice of options: adults.) 
Section 6
(Choice of options under Section
5: assistances.) 
Section 7
(Choice of options: adult carers.) 
Section 9
(Provision of information about self-
directed support.) 
Section 11
(Local authority functions.) 
Section 12
(Eligibility for direct payment: review.) 
Section 13
(Further choice of options on material
change of circumstances.)
Only in relation to a choice under
Section 5 or 7 of the Social Care (Self-
directed Support) (Scotland) Act 2013
.
Section 16
(Misuse of direct payment: recovery.) 
Page 283 of 290

Page 284

47 
Section 19
(Promotion of options for self-
directed support.) 
Carers (Scotland) Act 2016 
Section 6
(Duty to provide Adult carer support
plan) 
Section 21 
(Duty to set local eligibility criteria) 
Page 284 of 290

Page 285

48 
Column A
Enactment conferring function
Column B
Limitation
Section 24
(duty to provide support)
Section 25
(provision of support to carers: break
from caring) 
Section 31
(duty to prepare local carer strategy) 
Section 34
(information and advice service for carers)
Section 35 
(short breaks services statements) 
Part 2 -Services currently provided by the Local Authority
which are to be integrated
The services that pertain to the functions in Part 1 and will be delegated are set
out below ‘ 
Social work services for adults and older people
The functions in relation to social work services for adults and older people noted
below will be delegated.
a) Services and support for all adults with disabilities and long term
conditions;
b) Mental health services;
c) Addiction services;
d) Adult protection;
e) Carers’ services;
f) Community care assessment and planning services;
g) Support services provided by contracted services;
h) Care home services;
i) Intermediate Care Services;
j) Health and wellbeing improvement services;
k) Aspects of housing support, including provision of equipment and
adaptations to people’s homes;
l) Day opportunities and day services;
m) Homecare Services;
n) Supported Living Services;
Page 285 of 290

Page 286

49 
o) Respite Support;
p) Occupational therapy services;
q) Re-ablement services’
r) Smart technology, equipment and telecare.
Page 286 of 290

Page 287

50 
Annex 3 – Hosted Services Arrangements
Hosted Services Proposed Arrangements between North and South Lanarkshire
Integration Joint Board.
Where a Health Board spans s more than one Integration Joint Board, one of them
might manage a service on behalf of the other(s). This Annex sets out those
arrangements which the Parties wish to put in place. Such arrangements are subject
to the approval of the Integration Joint Board but will not be subject to Ministerial
approval. 
Services to be hosted by the South
Lanarkshire Integration Joint Board
Services to be hosted by the North
Lanarkshire Integration Joint Board
Brain Injury Unit Blood Borne Viruses Service
Diabetic Services Children and Adolescents Mental Health
Services
Occupational Therapy Services Children’s Services
Palliative Care Services Continence Services
Physiotherapy Services Dietetics Services
Primary Care Services Hospital at Home Services
Primary Care Out of Hours Services Immunisation Services
Primary Care Improvement Fund Integrated Equipment and Adaptations
Store
Public Dental Services Mental Health and Learning Disability
Services 
Podiatry Services 
Prisoner Health Care Services 
Sexual Health Services 
Speech and Language Therapy
Services
Page 287 of 290

Page 288

51 
Annex 4 – Health and Wellbeing Outcomes
Outcome 1- People are able to look after and improve their own health and wellbeing
and live in good health for longer.
Outcome 2- People, including those with disabilities, long term conditions, or who are
frail, are able to live, as far as reasonably practicable, independently and at home or
in a homely setting in their community. 
Outcome 3- People who use health and social care services have positive
experiences of those services and have their dignity respected. 
Outcome 4- Health and social care services are centred on helping to maintain or
improve the quality of life of people who use those services. 
Outcome 5- Health and social care services contribute to reducing health inequalities. 
Outcome 6- People who provide unpaid care are supported to look after their own
health and wellbeing, including to reduce any negative impact of their caring role on
their own health and wellbeing. 
Outcome 7 – People who use health and social care services are safe from harm. 
Outcome 8- People who work in health and social care services feel engaged with
the work they do and are supported to continuously improve the information, support,
care and treatment they provide. 
Outcome 9 – Resources are used effectively and efficiently in the provision of health
and social care services.
Page 288 of 290

Page 289

52 
Appendix 2 – Consultation Process 
North Lanarkshire Health and Social Care Partnership Integration Scheme 2024-
2029 Consultation Process
Key Meetings Integration Scheme was presented for Consultation
18th October 2023- 1st Draft of Integration Scheme submitted to the NL H&SCP
Integrated Joint Board Performance, Finance and Audit Committee.
22nd November 2023- 2nd Draft of Integration Scheme submitted to the NL H&SCP
Integration Joint Board – Draft Approved.
7th December 2023- Draft Integration Scheme submitted to The Local Authority Policy
and Strategy Committee – Draft approved.
19th December 2023- Draft Integration Scheme submitted to NL H&SCP Senior
Leadership Team Meeting.
20th December 2023- - Draft Integration Scheme submitted to The Health Board Meeting
– Draft approved. 
Public Consultation 
15th January 2024 to 11th February 2024 
The consultation added to the North Lanarkshire Health and Social Care Partnership
Website, The Health Board Website, and circulated via social media channels (Facebook
and X). The consultation was also sent to all The Health Board and NL HSCP news
subscribers (circa 10k).
The consultation was emailed to a range of consultees based on North Lanarkshire
Health and Social Care Partnership Strategic Planning Group. 
Consultees included health professionals, users of health care and social care, carers of
users of health care and social care, commercial providers of health care and social
care, social care professionals, staff of health board and local authority, non-commercial
providers of social housings, third sector bodies and locality representatives, as
necessitated by the Act.
Final Sign Off Process 
14th March 2024 – The Local Authority Policy and Strategy Committee
27th March 2024 – NHS Lanarkshire Board Meeting
Page 289 of 290

Page 290

53 
27th March 2024 – North Lanarkshire Integration Joint Board
Page 290 of 290