Page 1

28 May 2024 
Members of the 
Policy and Strategy Committee
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Policy and Strategy Committee is to be held in the
Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Thursday, 06
June 2024 at 14:00 PM which you are requested to attend. 
The agenda of business is attached. 
Archie Aitken
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Lesley Dysart
Clerk Telephone: 
Clerk Email: dysartl@northlan.gov.uk 
J Logue, L Roarty, C Barclay, A Beveridge, H Brannan-McVey, A Bustard, T Carragher, C
Costello, P Di Mascio, K Duffy, T Fisher, D Johnston, K Larson, J Leckie, G Lennon, H
Loughran, A Masterton, M McBride, L Nolan, G Robinson, A Smith, K Stevenson, A Stubbs,
S Watson, G Woods.  
Page 1 of 166

Page 2

Page 2 of 166

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000   
2 Policy and Strategy Committee Terms of Reference
Submit a copy of the remit/delegated functions of the
Committee following agreement of this Committee of 7
December 2023 
5 - 6 
3 Minutes   
3(a)  Appointments Sub-Committee Minutes of 19
February and 8 March 2024
Submit Minutes of the Meetings of the Appointments
Sub-Committee of 19 February, and 8 March 2024 
7 - 10 
3(b)  Minute of the Audit and Scrutiny Panel of 26
February 2024
Submit Minute of the Meeting of the Audit and Scrutiny
Panel of 26 February 2024 
11 - 20  
Financial   
4 5 Year Medium Term Financial Plan 2025/26 to
2029/30 and Revenue Budget Strategy
Submit report by the Chief Officer (Finance) providing
an update on the five-year medium term financial
forecast to 2029/30, which will be kept under review
with further updated financial Outlooks reported in line
with the Revenue Budget Framework outlined within
the report 
21 - 44  
Operational   
5 Open Space Strategy Update
Submit report by the Chief Officer (Place) providing an
update on the progress of the Open Space Strategy 
45 - 52
Page 3 of 166

Page 4

6  Community Use of Council Assets
Submit report by the  Chief Officer (Strategic
Communications and Engagement) seeking approval
of the Community Ownership and Management of
Council-Owned Assets Policy, and associated
developments to assist in the better use of assets by
community groups, whether through formal Community
Asset Transfer or other mechanism 
53 - 88 
7 Communications and Engagement Strategy Report
Submit report by the Chief Officer (Strategic
Communications and Engagement) seeking approval
of the Communications and Engagement Strategy 
89 - 108 
8 Leadership and Operating Model
Submit report by the Chief Officer (Strategic
Communications and Engagement) (1) setting out the
progress made to date against the Leadership and
Operating Model phased transition plan previously
approved by Policy and Strategy Committee on 16th
March 2023, and (2) seeking approval of the direction
of the programme in phase 2 aligned to the Plan for NL
programme of work, as summarised in next steps, and
illustrated in Appendix 3 of the report 
109 - 128 
9 One Workforce - Summer Placement Programme
Submit report by the Chief Officer (People Resources)
(1) acknowledging the success of the pilot programme
in 2023 and its contribution to building the Council's
next generation workforce, and (2) providing an update
of the summer placement programme for 2024 which
will offer 112 paid placements to young people in North
Lanarkshire 
129 - 138 
10  Annual Review of Whistleblowing
Submit report by the Chief Officer (Legal and
Democratic) informing that the annual review of the
Whistleblowing Procedure has been undertaken 
139 - 152 
11  Code of Conduct for Chief Officers
Submit report by the Chief Officer (Legal and
Democratic) seeking approval of the revised Code of
Conduct for Chief Officers 
153 - 166 
Page 4 of 166

Page 5

POLICY AND STRATEGY COMMITTEE 
(1) To plan, set targets for, and monitor the performance of all services within the remit of this
Committee. 
(2) To guide the Council in the formulation of its policy objectives and priorities and, for this
purpose, to consider the broad social and economic needs of the Authority and matters
of comprehensive importance to the area including the Business Plans and Strategies for
North Lanarkshire, and to recommend to the Council such forward programmes and other
steps as may be necessary to achieve those objectives. 
(3) To consider, whether following reference by another Committee or otherwise, new policies
or changes in policy which may have significant impact on the policy and plans of the
Council. 
(4) To prepare, implement and keep under continuous review such forward programmes as
the Committee considers necessary to achieve the Council's long term aims and
objectives. 
(5) To consider matters concerned with the structure and organisation of Local Government
generally, including arrangements concerning relations with the Scottish Parliament and
the Convention of Scottish Local Authorities except where those fall within the operational
responsibilities of another Committee. 
(6) * To prepare and review Standing Orders for the conduct of Meetings and the Scheme
of Administration of Council Business. 
(7) To consider electoral registration and all matters relating to the election of Councillors and
Scottish, United Kingdom and European elections including, inter alia, alteration of
electoral divisions and polling districts and the provision of polling stations and review of
boundaries and electoral arrangements. 
(8) * To oversee arrangements in relation to the Council’s corporate planning process
including development and review of the Business Plans and/or Strategies. 
(9) * To oversee the development, co-ordination and monitoring of the Plan for North
Lanarkshire. 
(10) To provide information concerning the activities of the Council and to consider matters of
public relations. 
(11) * To consider matters relating to allowances for Members. 
(12) To advise and represent the Council relative to Police and Fire matters. 
(13) * To oversee arrangements made to secure that the functions of the Council are carried
out with due regard to the need to meet the requirements of the law for the time being
related to equalities and equal opportunities and to advise the Council generally on its
policies with regard thereto so as to promote equality of opportunity among the residents
of North Lanarkshire and users of the Council’s services. 
(14) To supervise the activities of the Council, including the deployment of resources, in the
event of any emergency, as such may be defined by the Chief Executive. 
(15) To examine on behalf of the Council the ALEOs’ strategies, policies and future plans. 
Item 2
Page 5 of 166

Page 6

(16) To monitor and approve expenditure falling within the remit of this Committee consistent
with approved Council objectives. 
(17) To periodically review ALEOs to ensure that they remain the best option for service
delivery and represent best value in delivering against the relevant Council priorities and
objectives, and to determine on behalf of the Council, all recommendations within such
reports. 
(18) To deal with any matters contained within the Terms of Reference of any Sub-Committee
of the Policy and Strategy Committee. 
(19) To grant authority to Members to attend seminars, conferences and other visits
concerning matters within the areas of responsibility of this Committee. 
(20) To accept tenders for previously approved projects within the responsibility of this
Committee. 
(21) To consider all reports submitted by the Audit and Scrutiny Panel and to determine, on
behalf of the Council, all recommendations contained in all such reports. 
(22) To consider and agree action in relation to petitions received by the Council relative to
the business of the Committee. 
(23) To oversee the operation of the Chief Executive's Office. 
(24) To deal, on behalf of the Council, with any matter of urgency. 
(25) To deal with all matters not otherwise within the area of responsibility of another
Committee. 
(26) To guide the design, development and implementation of the Council’s transformational
policy programme and projects. 
(27) To approve and then oversee the delivery of the Council’s transformational and
digitisation programmes and projects, specifically:- 
• to initiate projects with a supporting business case, as appropriate; 
• to monitor progress against the Council’s Transformation Plan, and specific projects,
and agree the reporting arrangements that will be necessary to gain assurance
on delivery; 
• to monitor progress against the standard and associated benefits realisation, and 
• to monitor and authorise changes to the scope and timing of projects included within
the Transformation Plan. 
(28) To consider, agree and monitor delivery of the Council’s investment plan for the Shared
Prosperity Fund. 
Page 6 of 166

Page 7

APPOINTMENTS  SUB  -  19 FEBRUARY 2024 
1
19 February 2024 at 2.00 pm. 
A Meeting of the APPOINTMENTS  SUB-COMMITTEE 
PRESENT 
Councillor Logue, Convener; Councillor Roarty, Vice-Convener; Councillors Carragher, Fisher, Smith and
Watson. 
ALSO  PRESENT 
In accordance with Standing Order 64(A) Councillors Hume and Robinson attended as substitutes for
Councillors Lennon and Thomas respectively. 
CHAIR 
Councillor Logue (Convener) presided. 
IN  ATTENDANCE 
Depute Chief Executive; Chief Officer (People Resources), and Democratic Services Manager. 
APOLOGIES 
Councillors Lennon, Thomas and Williams. 
DECLARATIONS  OF  INTEREST  IN  TERMS  OF  THE  ETHICAL  STANDARDS  IN  PUBLIC  LIFE  ETC. 
(SCOTLAND)  ACT  2000 
1. The Sub-Committee noted that there were no declarations of interest. 
It was agreed in terms of Section 50A(4) of the Local Government (Scotland) Act 1973, that the public
be excluded from the meeting for the following item on the grounds that the business involved the
likely disclosure of exempt information as defined in paragraph 1 of Part 1 of Schedule 7A of the Act. 
POST  OF  CHIEF  OFFICER  (EDUCATION  –  NORTH)  –  RECRUITMENT  PACK 
2. There was submitted a recruitment pack which had been provided to applicants and made available
via the myjobscotland recruitment portal. 
Thereon, the Chief Officer (People Resources) provided an overview of the skills, experience and
knowledge demonstrated in each application forms. 
There was submitted application forms received in respect of the post of Chief Officer (Education –
North).   
Decided: that applicants 6, 8, 9, 12, 15 and 17 proceed to interview. 
Item 3(a)
Page 7 of 166

Page 8

APPOINTMENTS  SUB  -  19 FEBRUARY 2024 
2
ARRANGEMENT  FOR  INTERVIEWS 
3. The Sub-Committee considered the appropriate arrangements for the interview of candidates. 
Decided: 
(1) that a pre-meeting take place on Thursday, 7 March 2024 at 2 pm, and 
(2) that interviews take place on Friday, 8 March 2024. 
Page 8 of 166

Page 9

APPOINTMENTS  SUB  -  8  MARCH  2024 
1
8 March 2024 at 9.15 am. 
A Meeting of the APPOINTMENTS  SUB-COMMITTEE 
PRESENT 
Councillor Logue, Convener; Councillor Roarty, Vice-Convener; Councillors Carragher, Fisher, Smith and
Watson. 
ALSO  PRESENT 
In accordance with Standing Order 64(A) Councillors Hume and Robinson attended as substitutes for
Councillors Lennon and Thomas respectively. 
CHAIR 
Councillor Logue (Convener) presided. 
IN  ATTENDANCE 
Depute Chief Executive. 
APOLOGIES 
Councillors Lennon, Thomas and Williams 
POST  OF  CHIEF  OFFICER  (EDUCATION  -  SOUTH) 
1. There were submitted the recruitment pack and application forms for each candidate to be interviewed
in relation to the post of Chief Officer (Education – South). 
Decided: that candidate 12 be offered the post of Chief Officer (Education – South). 
Page 9 of 166

Page 10

Page 10 of 166

Page 11

AUDIT  AND  SCRUTINY  PANEL  -  26  FEBRUARY  2024 
1
26 February 2024 at 10 am. 
A Meeting of the AUDIT  AND  SCRUTINY  PANEL 
PRESENT 
Councillor Watson, Convener; Councillors Brannan-McVey, Fisher, Hughes, Hume, D. Johnston,
B. McCulloch, McLaren and Robinson. 
CHAIR 
Councillor Watson (Convener) presided. 
IN  ATTENDANCE 
Chief Officer (Audit and Risk); Chief Officer (Business and Digital); Chief Officer (Education – North); Business
Strategy Manager; Strategy and Performance Manager; Principal Auditor, and Democratic Services Manager. 
ALSO  IN  ATTENDANCE 
J. Boyd, K. Graham and P. Murray, Audit Scotland. 
APOLOGIES 
Councillors Dunbar and Leckie. 
DECLARATIONS  OF  INTEREST  IN  TERMS  OF  THE  ETHICAL  STANDARDS  IN  PUBLIC  LIFE  ETC. 
(SCOTLAND)  ACT  2000 
1. There were no declarations of interest. 
UPDATE  ON  SCHOOL  FUNDS  AND  SCHOOL  TRIPS 
2. There was submitted a report by the Chief Officer (Education – North) (1) responding to the request
made by the Panel to provide a report for management following the Panel’s consideration at its
meeting in November 2023 of two separate Internal Audit reports on school excursions and
management of school funds; (2) reminding the Panel that, during its consideration of these reports,
a number of issues had been highlighted on which it sought information from the Service in order to
gain assurance that the weaknesses identified were being appropriately addressed; (3) reiterating the
reviews previously undertaken by Internal Audit relevant to this matter and the subsequent actions
which had been taken by the Service in response; (4) detailing a number of future planned actions
together with appropriate timescales, and (5) attaching, as an Appendix to the report, the summary of
relevant Internal Audit assignments. 
During consideration of the report, Panel members raised a number of questions which were
responded to by appropriate Officers, namely (a) timescale to implement the new framework; (b)
clarification on whether the primary or secondary sector presented a greater risk to the Service; (c)
confirmation that previous and existing practices had been halted pending introduction of the new
processes; (d) that links should be made with the Council’s procurement service to ensure that best
value can be achieved for school trips and excursions; (f) confirmation on which Officers will provide
approval for trips and excursions, and (g) details of the engagement with head teachers on this matter. 
Item 3(b)
Page 11 of 166

Page 12

AUDIT  AND  SCRUTINY  PANEL  -  26  FEBRUARY  2024 
2
Decided: 
(1) that the findings, conclusions and recommendations of completed Internal Audit reports,
together with the associated management responses, be noted; 
(2) that it is considered that there are no issues raised by Internal Audit which the Panel considers
are sufficiently significant to require a further report from management to be submitted to a
future meeting of the Panel; 
(3) that Internal Audit provide a report to future meetings of the Panel, reporting progress made
in the implementation of agreed management actions in relation to all audit recommendations
categorised as High or Medium, and 
(4) that the contents of the report be otherwise noted. 
AUDIT  SCOTLAND  ANNUAL  AUDIT  PLAN  2023-24 
3. There was submitted a report by the Chief Officer (Audit and Risk) providing the Panel with sight of
the Annual Audit Plan 2023/24 which had been received from Audit Scotland, the Council’s appointed
external auditors; (2) attaching, as an Appendix to the report, the Audit Scotland Annual Audit Plan
which provides an overview of key issues arising from the audit planning process including (a) a
summary of the proposed audit approach; (b) that wider scope audit work will be carried out, and (c) a
timetable for key audit outputs, and (3) noting that good professional practice requires the external
auditor to communicate and discuss planned external audit activity with the senior management and
with those elected Members charged with governance matters. 
Thereon, J. Boyd, Audit Scotland, spoke to the Audit Scotland Annual Audit Plan and responded to a
number of questions from Members of the Panel. 
Decided: that the Annual Audit Plan by Audit Scotland, together with the oral presentation
provided by Audit Scotland, regarding its planned audit approach to the 2023-24 audit
of the Council, be noted. 
AUDIT  AND  RISK-RELATED  ITEMS:  ACTION  LOG 
4. There was submitted a report by the Chief Officer (Audit and Risk) enabling the Panel to track
implementation of requests and recommendations made by it in respect of Aduit and Risk related
items in the previous 18 months, with the action log, attached as an Appendix to the report, recording
those requests and recommendations made by the Panel, and when these had been addressed and/or
were expected to be addressed. 
Decided: that the contents of the report be noted. 
INTERNAL  AUDIT  PROGRESS  REPORT 
5. There was submitted a report by the Chief Officer (Audit and Risk) (1) providing an overview of Internal
Audit activity; (2) reporting the results of the Internal Audit outputs finalised since the last update to
the Panel in November 2023; (3) highlighting the most significant issues arising from the completed
audit work; (4) updating the Panel on other aspects of the work of Internal Audit, and (5) attaching, as
an Appendix to the report, a brief summary of the scope and key findings of each substantive planned
audit, together with a summary pack containing copies of those reports. 
Page 12 of 166

Page 13

AUDIT  AND  SCRUTINY  PANEL  -  26  FEBRUARY  2024 
3
During consideration of the matter, the Panel expressed the view that it required to have continued
awareness in respect of the matter of school funds management and sought assurance on how this
could be achieved and timescales for reporting back to the Panel. The Chief Officer (Audit and Risk)
advised that he would be monitoring the Service’s compliance in respect of this matter during the first
year of implementation of the new processes and would report back to the Panel at an early stage,
most likely to be after the Summer period 2024. 
Decided: 
(1) that the findings, conclusions and recommendations of completed Internal Audit reports,
together with the associated management responses, be noted; 
(2) that Internal Audit provide a report to future meetings of the Panel on progress made by
management in implementing agreed management actions in relation to all audit
recommendations categorised as high or medium; 
(3) that a report be brought back to the Panel post-Summer 2024 in relation to the effectiveness
of the Service’s compliance monitoring of the implementation of new processes in respect of
school funds management, and 
(4) that the contents of the report be otherwise noted. 
INTERNAL  AUDIT:  FOLLOW-UP  OF  ACTIONS  PREVIOUSLY  AGREED  BY  MANAGEMENT  IN 
RESPONSE  TO  AUDIT  RECOMMENDATIONS 
6. There was submitted a report by the Chief Officer (Audit and Risk) (1) detailing the extent to which
management had implemented actions previously committed to in response to recommendations
contained within Internal Audit reports, where those actions were due to be completed by the end of
December 2023; (2) advising that Internal Audit had concluded that 18 of the 35 actions agreed in
response to relevant Internal Audit recommendations during the period had been fully completed, with
17 having been assessed as partially implemented; (3) explaining that of the 11 actions due in respect
of external outputs, 5 had been completed, 5 were not yet due and 1 was considered no longer
relevant; (4) attaching, as an Appendix to the report, a commentary from management with details of
proposed management actions, together with the revised target dates for completion of those
outstanding audit recommendations where Internal Audit had assessed the residual risk as high or
medium, and (5) attaching, as Appendices to the report, (a) Internal Audit recommendations:
management actions assessed as not yet completed in this cycle; (b) residual risk rating definition,
and (c) outstanding Internal Audit recommendations at the February cycle where the revised
implementation date was not yet due. 
During consideration of this item, concerns were expressed by the Panel in relation to the robustness
and resilience of the general control environment in relation to payroll which continued to demonstrate
weaknesses and/or areas requiring improvement and the Panel sought an explanation of the issue. 
Following a response from Officers it was agreed that a review of this matter, specifically in relation to
the performance of the Midland HR software application, used for payroll controls and future plans
surrounding this, be incorporated into the Scrutiny Work Programme. 
Additionally, a request was made by the Panel that reference numbers be attached to each item within
the report to enable elected Members to better track the progress of the management actions between
Panel meetings.  The Chief Officer (Audit and Risk) advised that he would seek to address this
concern. 
Decided: 
(1) that the contents of the report be noted 
Page 13 of 166

Page 14

AUDIT  AND  SCRUTINY  PANEL  -  26  FEBRUARY  2024 
4
(2) that the recommendations made by Internal Audit at Appendix 1 to the report be noted; 
(3) that the updates provided by management at Appendix 2 to the report be noted, and 
(4) that a review of payroll controls, particularly relating to the software used, be incorporated into
the Scrutiny Work Programme. 
ACCOUNTS  COMMISSION:  LOCAL  GOVERNMENT  FINANCIAL  BULLETIN  2022-23 
7. There was submitted a report by the Chief Officer (Audit and Risk) (1) presenting to the Panel the
Accounts Commission Local Government Financial Bulletin 2022-23 which had been published in
January 2024; (2) attaching, as an Appendix to the report, the report by the Accounts Commission
which presents its considerations of the financial performance of councils in 2022-23, together with a
commentary on the financial outlook for local government and issues arising; (3) highlighting that
effective financial management within councils is crucial as budget gaps increase; (4) commenting
that councils continue to rely on savings, reserves and other financial flexibilities to balance budgets
which helps with immediate budget pressures but defers costs to later years and fails to tackle
underlying challenges to financial sustainability; (5) highlighting that, despite more core funding from
the Scottish Government for 2023-24, there was a significant increase in councils’ total funding gap
due to pressures including increased demand for services, inflation and the cost-of-living; (6) noting
that some Councils have experienced opposition from within their communities when seeking to
reduce services to balance budgets which they consider re-enforces the need for frank consultation
and engagement with communities when planning change, and (7) indicating that the report by the
Accounts Commission contains a small number of audit recommendations and the management
responses to these are included in the report by the Chief Officer (Audit and Risk). 
During consideration of this matter, commentary was sought by the Panel in relation to the information
made available to Members in relation to the Council’s Reserves Policy and the use of reserves with
Officers responding that this was a question best raised at the Finance and Resources Committee and
it was further clarified that a meeting of that Committee would be taking place later that week and that
this item was also on the agenda for that meeting. 
Decided: 
(1) that the findings and recommendations contained within the Accounts Commission report, and
the management response to the issues raised, be noted; 
(2) that it be noted that financial sustainability remains a key corporate risk with relevant and
existing controls, and the future planned actions, subject to regular review by the Council’s
senior management, and 
(3) that, given the scope of the Accounts Commission report, the report be remitted to the Finance
and Resources Committee for its consideration. 
RISK  MANAGEMENT  UPDATE 
8. There was submitted a report by the Chief Officer (Audit and Risk) (1) providing an update on key risk
management developments, and changes in relation to the Corporate Risk Register and other key risk
management developments since the last update to the Panel in November 2023; (2) providing a
particular focus on changes to corporate risk scores, new or emerging risk issues and a snapshot of
the highest current residual risks within Service Risk Registers; (3) explaining that the Corporate Risk
Register is formally reviewed annually to ensure completeness and continuing alignment to the
Council’s strategic objectives, The Plan for North Lanarkshire and that the associated Programme of
Work and the improved Corporate Risk Register for 2023-24 had been presented to the Panel in
September 2023; (4) explaining that the Corporate Risk Register is also continually reviewed during
Page 14 of 166

Page 15

AUDIT  AND  SCRUTINY  PANEL  -  26  FEBRUARY  2024 
5
the year to ensure it remains valid and up to date and properly reflects new and emerging risks and
changes to existing risks; (5) noting that all corporate risks identified and agreed as meriting inclusion
in the Corporate Risk Register are subject to regular monitoring and review by relevant senior
management, and periodic review and consideration of individual risks by both the Corporate
Management Team and the Panel in line with their respective governance roles; (6) highlighting that
a small number of additions, deletions and changes to scores had been made to risks included in the
Corporate Risk Register with these being detailed within the report, and (7) attaching, as Appendices
to the report (a) the 2023-24 Corporate Risk Register, and (b) Service risks with the highest residual
scores. 
During consideration of the report, Councillor McLaren, in his role as Convener of the Regulatory
Committee, expressed his concern regarding fire safety inspections at stadia located within North
Lanarkshire and that the Scottish Fire and Rescue Service no longer undertake these checks.  The
Chief Officer (Audit and Risk) advised that he would consult with relevant colleagues and respond
directly to the Member. 
Further, the Panel sought clarification on whether the ongoing investigation into one of the Council’s
strategic partners had been added to the Corporate Risk Register as the outcome of that investigation
would be critical to decisions about the future service delivery.  The Chief Officer (Audit and Risk)
advised that it had not been formally added to the Corporate Risk Register but a number of internal
groups were reviewing what the possible outcomes and implications, and the impacts, of the
investigation might be for the Council and future service delivery. 
Finally, confirmation was sought as to whether the rationale for changes to risk scores within the
Corporate Risk Register were documented and whether elected Members could have access to that
documentation.  The Chief Officer (Audit and Risk) explained the purpose of deep dive documents
and the scoring process incorporated within them and advised that these could be provided to elected
Members if they so wished. 
Decided: 
(1) that the current scoring for risks on the Corporate Risk Register for 2023-24, attached as
Appendix 1 to the report, be noted, and 
(2) that the information contained within the report in respect of risk management arrangements
in relation to corporate risks and risks within Services be noted. 
SCRUTINY  WORK  PROGRAMME  -  UPDATE 
9. There was submitted a report by the Chief Officer (Business and Digital) (1) explaining that the report
followed on from the initial report in February 2023 which had set out the work programme for the
scrutiny function of the Panel which comprises (a) items, functions or activities requiring scrutiny
identified and submitted by the Panel and considered through the assessment and prioritisation
process, and (b) the presentation of information and reports aligned to the long-term vision set out in
The Plan for North Lanarkshire and its supporting strategic frameworks; (2) reminding the Panel that
a subsequent mid-year report, in September 2023, had been considered by it and this had provided
an update in terms of the Scrutiny Work Programme and all related reports scheduled to be presented
to the Panel during each cycle of 2023/24, with the report also setting out a commitment to provide a
six-monthly update to the Panel thereafter; (3) explaining that the approach detailed in the report aims
to ensure that the Council fulfils both (a) its statutory best value duty, and (b) the principles of good
corporate governance, and (4) attaching, as Appendices to the report, (a) the approach to scrutiny led
by members of the Panel; (b) the assessment and prioritisation process, and (c) the composite Scrutiny
Work Programme with a timetable of reports to Panel meetings – 2024-2025 (as at January 2024). 
During consideration of this matter Councillor Robinson requested that a review of outside bodies be
added to the Scrutiny Work Programme together with a review on the effectiveness of Community
Boards. The Chief Officer (Audit and Risk) advised that a self-assessment on Community Boards had
Page 15 of 166

Page 16

AUDIT  AND  SCRUTINY  PANEL  -  26  FEBRUARY  2024 
6
been undertaken in 2023 and that this had been reported to the North Lanarkshire Strategic
Leadership Board and had included a number of recommendations which Officers were currently
considering.  Officers thereafter proposed that a report from the Chief Officer (Strategic
Communication and Engagement) might be of use to the Panel and would seek that the Officer present
a report in due course. 
Finally, it was proposed that, in respect of the review of outside bodies, a meeting take place between
Councillor Robinson, the Chief Officer (Legal and Democratic) and the Business Strategy Manager to
discuss this matter and to establish what the scope of such a review would be. 
Decided: 
(1) that the six-monthly updates to the composite Scrutiny Work Programme, and the reporting
timetable for the scrutiny function of the Panel, as set out in Appendix 3 to the report, be noted; 
(2) that the role of Panel members in identifying potential issues for inclusion in the Scrutiny Work
Programme in line with the assessment and prioritisation process, attached as Appendix 2 to
the report, and the overall approach, detailed in Appendix 1 to the report, be endorsed, and 
(3) that the Panel continues to carry out its scrutiny role in reviewing and challenging performance
to ensure that the Council fulfils its statutory best value duty. 
STRATEGIC  PERFORMANCE  FRAMEWORK  -  PERFORMANCE  REPORTING  SCHEDULE 
QUARTERLY  PERFORMANCE  ASSURANCE  REVIEW 
10. There was submitted a report by the Chief Officer (Business and Digital) (1) reminding the Panel that
it had received a report in February 2023 on the Strategic Performance Framework – Performance
Reporting Schedule 2023-2024 and a subsequent report in May 2023 setting out the first performance
assurance review that had been undertaken of performance reports and submitted to Council
Committees during the previous cycle; (2) confirming that the report in May 2023 had advised that
performance assurance reviews would thereafter be reported to the Panel on a quarterly basis with
this report therefore providing the outcome from the latest performance assurance reviews that had
been undertaken of performance reports previously submitted to Council Committees during cycle 4
of 2023, and (3) attaching, as Appendices to the report, (a) Chief Officer six monthly performance
reviews at Service Committees in line with the Strategic Performance Framework, and (b) Chief Officer
Service specific performance reporting which takes place each year to meet business and/or statutory
obligations. 
During consideration of this item discussion took place regarding the accuracy of the data provided as
part of the Local Government Benchmarking Framework (LGBF) in relation to performance information
for children’s social work and child protection.  The Strategy and Performance Manager outlined the
time lag in the Improvement Service’s publication of the data relating to the LGBF and committed to
providing an update to the Panel in relation to any updated data in respect of the query raised. 
Decided: 
(1) that the composite overview of performance reporting, provided in Appendices 1 and 2 to the
report, be noted and that the Panel would maintain an awareness of each report within the
performance reporting schedule for 2023-2024, and 
(2) that any updated data in respect of the LGBF performance in respect of children’s social work
and child protection be shared with Panel members. 
Page 16 of 166

Page 17

AUDIT  AND  SCRUTINY  PANEL  -  26  FEBRUARY  2024 
7
THE  PLAN  FOR  NORTH  LANARKSHIRE:  FRAMEWORK  AND  SCHEDULE  4  PERFORMANCE 
REPORTING  AND PROGRESS  MONITORING  FOR  2024/25 
11. There was submitted a report by the Chief Officer (Business and Digital) (1) recalling the Performance
Reporting Schedule for 2023-2024 considered by the Panel at its meeting in February 2023, with this
Schedule supporting the Strategic Performance Framework by setting out the performance reporting,
monitoring, review and scrutiny arrangements for The Plan for North Lanarkshire by way of a reporting
schedule and set of non-negotiable standards; (2) advising that, during 2023/24, information regarding
items on the Performance Reporting Schedule had been made available to the Panel through quarterly
performance assurance reports in order to support its scrutiny and strategic oversight role;
(3) confirming that, since its implementation, the Performance Reporting Schedule has been regularly
reviewed and updated and that this year’s refresh of the Schedule differs to previous years in that it
also incorporates a programme of work, performance management and progress monitoring, with this
arising out of work to update the Strategic Performance Framework and development of delivery plans
and performance measures for each of the seven Programme of Work priorities, whilst ensuring further
alignment and formalisation of the corporate arrangements that support monitoring and governance
of The Plan for North Lanarkshire; (4) setting out the performance reporting, monitoring, review and
scrutiny arrangements for The Plan for North Lanarkshire by way of a reporting framework, schedule
and a set of quality and non-negotiable standards to be implemented for 2024-2025; (5) intimating
that, as reports and information to support these new arrangements become available, they will be
integrated within the quarterly performance assurance reports to the Panel during 2024/25, and
(6) attaching, as Appendices to the report, (a) the reporting framework; (b) the reporting schedule;
(c) reporting standards; (d) performance management, and progress monitoring roles and
responsibilities; (e) statutory Public Performance Reporting requirements, and (f) the current audit
position. 
Decided: 
(1) that the reports within the reporting schedule for 2024-2025 be noted in line with the Panel’s
remit to provide independent review of the Council’s governance, risk management,
performance and control frameworks; 
(2) that it be acknowledged that the Panel would have an opportunity for scrutiny and strategic
oversight of specific items in the Reporting Framework/Schedule through the quarterly
performance assurance reports process, and 
(3) that it be acknowledged that the Reporting Framework/Schedule forms a key part of the
Scrutiny Work Programme, which supports the Best Value governance and accountability
theme by ensuring that the Council can demonstrate the existence of robust arrangements for
scrutiny and performance reporting. 
QUALITY  ASSURANCE  ARRANGEMENTS  FOR  THE  PROJECT  MANAGEMENT  FRAMEWORK  AND 
THE  PROGRAMME  OF  WORK  -  ROLE  OF  THE  AUDIT  AND  SCRUTINY  PANEL 
12. There was submitted a report by the Chief Officer (Business and Digital) (1) reminding the Panel that
the Programme of Work is key to achieving the shared ambition set out in The Plan for North
Lanarkshire and that, to date, it has collectively facilitated a co-ordinated approach to successfully
delivering a wide range of programmes, projects, and large high-scale transformational activities,
including the Council’s Capital Investment Programme; (2) confirming that, to deliver successful
investment and transformation programmes and projects, the Council needs to ensure that the plans
are well designed and well executed and that good project management arrangements and good
governance, therefore, go hand in hand; (3) advising that the delivery of The Plan for North Lanarkshire
is subject to a set of quality assurance arrangements in line with the Corporate Project Management
Framework, which had been reviewed, refreshed, and launched across the Council in December 2022;
(4) explaining that good practice recommends that a council’s audit and scrutiny committee plays an
important role in providing independent assurances in respect of the delivery of major programmes,
and projects, with the report providing the initial overview of the quality assurance arrangements for
Page 17 of 166

Page 18

AUDIT  AND  SCRUTINY  PANEL  -  26  FEBRUARY  2024 
8
the Panel’s information, and that this was in advance of future assurance reports that would support
elected Member oversight in terms of the quality assurance process and review programme for the
Project Management Framework, and (5) attaching, as an Appendix to the report, Internal Audit
recommendations in relation to project management. 
Decided: 
(1) that the quality assurance arrangements as set out in the report, and the role of the Audit and
Scrutiny Panel therein, be acknowledged; 
(2) that the next steps as detailed in the report to further support the Council in demonstrating
progress in delivering the Programme of Work and achieving the vision set out in The Plan for
North Lanarkshire be noted, and 
(3) that the extent to which implementation of the quality assurance arrangements, and the next
steps set out in the report, fulfil the Internal Audit recommendations in terms of governance
and capital projects and managing strategic change, as detailed in Appendix 1 to the report,
be recognised. 
AUDITING  BEST  VALUE  IN  LOCAL  GOVERNMENT  -  UPDATE 
13. There was submitted a report by the Chief Officer (Business and Digital) (1) reminding the Panel that
the Best Value duty requires the Council to ensure arrangements are in place to secure continuous
improvement in performance for all the functions and activities undertaken to deliver services and
improve outcomes; (2) advising that, since the implementation of that duty 20 years ago, all local
authorities in Scotland had been subject to ongoing national and local audit processes to ensure that
they continue to be able to demonstrate Best Value in practice; (3) reporting that a new national
approach to auditing Best Value came into effect as part of the external auditors’ five-year
appointments for 2022/2023 and that this approach means that the Council undergoes an assessment
of particular aspects of Best Value each year in order to provide the Accounts Commission with the
relevant assurances in terms of performance and the quality of services to the public; (4) indicating
that the new approach integrates Best Value audit work within the wider scope of the external auditor’s
annual audit work which is reported in the Annual Audit Report, and also includes thematic work
detailed by the Accounts Commission to provide assurance on areas of risk and interest across
Scotland as at a defined point in time; (5) detailing a number of next steps to be taken in respect of
this area, and (7) attaching, as an Appendix to the report, an extract from “Best Value in Scotland -
20 years of auditing Best Value and next steps for Best Value reporting in Scottish Councils” published
by the Accounts Commission in September 2023. 
Decided: 
(1) that the updates to the national approach to auditing Best Value, the priorities for the 2023/24
Best Value audit work, and the implications for the Council in this respect be acknowledged,
and 
(2) that the role of the Panel in terms of ensuring the Council continues to secure Best Value in
practice in line with the Council’s statutory duty be endorsed. 
STRATEGIC  SELF-EVALUATION  FRAMEWORK  -  ANNUAL  REVIEW  AND  REFRESH 
14. There was submitted a report by the Chief Officer (Business and Digital) (1) recalling that to meet the
Best Value duty the Council must ensure arrangements are in place to secure continuous improvement
in performance for all the functions and activities undertaken to deliver services and improve
outcomes; (2) intimating that a single strategy for improvement is in place through the Strategic
Self-Evaluation Framework and the rolling review programme, which were initially approved by the
Page 18 of 166

Page 19

AUDIT  AND  SCRUTINY  PANEL  -  26  FEBRUARY  2024 
9
Panel in September 2021, and that a subsequent review and refresh process has been undertaken
each year and reported to the Panel annually; (3) explaining that the Strategic Self-Evaluation
Framework is specifically designed to be strategic but light touch, and consistent but flexible, to ensure
that self-evaluation exercises are tailored to the service, function, project or group being evaluated
and designed within the context of that operating environment; (4) informing that items on the rolling
review programme aim to ensure a mechanism is in place to assess the Council’s functions and
activities, and identify areas for improvement within the context of fulfilling the vision set out in The
Plan for North Lanarkshire; (5) detailing that, as one of the six inter-related corporate frameworks
designed to support The Plan for North Lanarkshire, the Strategic Self-Evaluation Framework is on a
programme for a regular review and refresh exercise and, following this year’s review process,
presenting the Refresh Framework and Rolling Review Programme for 2024-2025, attached as an
Appendix to the report, for the information of the Panel, and (6) attaching, as Appendices to the report,
(a) the assessment criteria and statements; (b) the Rolling Review Programme; (c) the options
appraisal process, and (d) the options appraisal template. 
Decided: 
(1) that the refreshed Strategic Self-Evaluation Framework and Rolling Review Programme, and
the purpose therein in terms of ensuring that self-evaluation identifies areas for improvement
and contributes to the achievement of the vision set out in The Plan for North Lanarkshire, be
acknowledged, and 
(2) that the challenge and scrutiny role of the Panel, in line with its responsibility to provide an
independent review of the Council’s governance, risk management, performance and control
frameworks, be endorsed. 
PERFORMANCE  IN  COMPLAINTS  HANDLING 
15. There was submitted a report by the Chief Officer (Business and Digital) (1) explaining that the Scottish
Public Services Ombudsman (SPSO) has established a local authority Model Complaints Handling
Procedure which defines a two-stage process which the Council is required to implement when
handling all complaints received; (2) explaining that a key aspect of this procedure is the supporting
complaints governance arrangements in terms of reporting and publicising complaints information,
which includes performance statistics, trends and outcomes, and actions taken to improve services;
(3) providing an update on the performance of the Council in complaints handling in line with the
Panel’s role to provide an independent review of the Council’s governance, risk management,
performance and control frameworks; (4) detailing a number of next steps to be undertaken to ensure
complaints continue to support efficient ways of working and to inform improvements to services, and
(5) attaching, as Appendices to the report, (a) the two-stage local authority model complaints handling
procedure; (b) a summary of complaints performance at stage 1 and stage 2, and (c) lessons learned. 
Decided: 
(1) that the local authority Model Complaints Handling Procedure is in place across the Council,
and the corresponding complaints governance requirements, in terms of performance
reporting, be noted, and 
(2) that it be noted that a further report in terms of complaints performance is scheduled to be
presented to the Panel in Cycle 4 of 2024 as per the Scrutiny Work Programme, with reports
annually thereafter. 
Page 19 of 166

Page 20

AUDIT  AND  SCRUTINY  PANEL  -  26  FEBRUARY  2024 
10
ARMS  LENGTH  EXTERNAL  ORGANISATIONS:  GOVERNANCE  AND  RISK  MANAGEMENT 
OVERSIGHT  AND  ASSURANCE  (JULY  TO  DECEMBER  2023) 
16. There was submitted a report by the Chief Officer (Business and Digital) (1) providing an update on
the externalised service delivery arrangements within North Lanarkshire through the Council’s portfolio
of Arms Length External Organisations (ALEOs); (2) confirming where established performance
monitoring reporting arrangements had been complied with and identifying, by exception, financial
matters that require close monitoring by the Board of Directors or Management Committees for each
individual ALEO, along with robust, separate oversight by the Council’s Finance Service; (3) reflecting
on a reduction in recent years in the number of wholly owned ALEOs that are providing services on
behalf of the Council and acknowledging that the Arms Length landscape will be impacted further
through roll-out of the Enterprise Strategic Vehicle; (4) recommending that a review of the format of
future reports to the Panel be undertaken, with the findings to be reported for consideration at a future
meeting; (5) recommending that a refresh of the ALEO review programme is undertaken over 2024/25
and 2025/26 to ensure that the externalised service delivery arrangements for the Council’s wholly
owned ALEOs continue to demonstrate best value and meet the Council’s expectations; (6) providing
a detailed narrative on each of the Council’s ALEOs and any other associated bodies, and (7)
attaching, as Appendices to the report, (a) a summary of in-scope ALEOs and joint venture
partnerships, and (b) statutory bodies: associates and joint ventures. 
Thereon, the Panel was informed that Culture and Leisure North Lanarkshire (CLNL) would be officially
dissolved the following day and that the striking off of the company at Companies House had been
suspended due to an objection to that striking off having been received, with officers seeking
information from Companies House to enable engagement with the complainant to try and resolve the
matter. 
The Convener requested that the Panel be kept updated on the situation regarding the striking off at
Companies House of CLNL. 
Decided: 
(1) that it be acknowledged that ALEO governance, performance reporting and financial
monitoring arrangements were progressing satisfactorily; 
(2) that recent changes to the Council’s ALEO portfolio be noted and that it be acknowledged that
this will be subject to further change as the Enterprise Strategic Vehicle is mobilised; 
(3) that a review of the format and frequency of future reports to the Panel is undertaken with the
findings reported to it at a future meeting, and 
(4) that a refresh of the ALEO review programme be undertaken during 2024/25 and 2025/26 and
that it be noted that the findings from these Client Service led reviews would be reported to
future meetings of the Policy and Strategy Committee in due course and in line with the
Council’s Scheme of Administration. 
Page 20 of 166

Page 21

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  EK/KS Date 06/06/24 
5 Year Medium Term Financial Plan 2025/26 to 2029/30 & Revenue
Budget Strategy 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail kempe@northlan.gov.uk Telephone  07939 280601 
Executive Summary
This report provides an update on the five-year medium term financial forecast to 2029/30,
which will be kept under review with further updated Financial Outlooks reported in line
with the Revenue Budget Framework outlined in the report.  The report outlines the
challenges faced by the Council in maintaining medium term financial stability, whilst
achieving the strategic priorities of the Council. 
Taking the approved 2024/25 budget as the new baseline, this plan updates on the key
financial planning assumptions focussing on those factors which have the greatest
potential to impact the Council’s forecast financial position in the medium term.  This
includes future revenue grant funding, pay and non-pay inflation.  A range of risk-based
scenarios have been considered, resulting in envisaged, pessimistic and optimistic
positions, as set out in Appendices 1 to 3.   Whilst the envisaged scenario remains the
most appropriate for planning purposes, it is important to note the budget gap range,
reflecting other potential scenarios the Council may face.   
Table 1 below includes the optimistic and pessimistic scenarios and demonstrates the
volatility and the extent of the fluctuation possible over the period of this plan.  The
summary forecast envisaged position, indicates a budget gap of £100.084 million over the
planning period and £61.976 million for the three-year budget period, 2025/26 to 2027/28. 
Reflecting the other planning scenarios, the budget gap is estimated to range between
£21.758 million and £225.518 million over the five-year period, and £11.422 million and
£132.758 million over three years.   This position is prior to any consideration of Council
Tax increases, additional savings or other potential solutions to manage the position.   
Financial
Year
Budget Gap
Optimistic
(£000)
Budget Gap
Envisaged
(£000)
Budget Gap
Pessimistic
(£000)
2025/26 1,851 21,561 40,349
2026/27 3,920 21,320 47,275
2027/28 5,651 19,095 45,134
2028/29 5,723 19,433 46,443
2029/30 4,613 18,675 46,317
Total 21,758 100,084 225,518
3 Year Gap 11,422 61,976 132,758
Table 1
Item 4
Page 21 of 166

Page 22

1. Background  
1.1. Members will appreciate longer term planning is integral to the Council’s Financial
Strategy and the strategic approach to budgeting.  Effective decision making relies on
robust financial planning and the Medium-Term Financial Plan (MTFP) assists in
ensuring resources are aligned to the key priorities outlined in The Plan for North
Lanarkshire are affordable and sustainable.   
1.2. The MTFP reflects the financial risks that may impact on the Council’s ability to continue
to provide high quality services focussing on the strategic priorities, whilst balancing
the budget.  Therefore, this plan continues to consider a range of scenarios and
highlights the associated forecast budget position.  Taking the 2024/25 approved
budget position as the new baseline, key financial planning assumptions have been
reviewed and updated, and are reflected in this plan.  A range of risk-based outcomes
continued to be modelled highlighting optimistic, envisaged and pessimistic scenarios.   
1.3. The two main variables with the greatest potential to impact the forecast financial plan
and the Council’s ability to set a balanced budget are the level of funding provided by
This report also provides an update on the key principles of the Revenue Resources
Budget Strategy approved by Policy and Strategy Committee in June 2019, and outlines
the Revenue Budget Framework to govern the budget process, which will ensure
sustainable solutions are identified to manage the challenging financial position faced by
the Council in setting a balanced budget.  As approved by Council on 15 February 2024
and outlined at paragraph 2.35, it is anticipated that part of the solution will result from a
series of service reviews to be undertaken, which will identify savings options or income
generation opportunities.  The outcome of such reviews will be reported to relevant service
committees in due course and financial implications identified will be incorporated in future
Financial Outlooks. 
Recommendations
It is recommended that the Policy Strategy Committee: 
1) Approves the updated Medium Term Financial Plan 2025/26 to 2029/30. 
2) Recognises this plan will be subject to ongoing review with updates reported as
outlined in the Revenue Budget Framework. 
3) Approves the Revenue Budget Strategy update and restated key principles. 
4) Acknowledges the Revenue Budget Framework to manage the three-year forecast
financial position outlined in the MTFP, which will facilitate the identification of a
sustainable solution by Council in meeting its statutory obligation to set a balanced
budget. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work All Programmes of Work
Page 22 of 166

Page 23

the Scottish Government and pay inflation. Reflecting on the Office for Budget
Responsibility’s (OBR) most recent economic forecast and the downward trajectory for
inflation towards the longer-term target of 2%, it is anticipated that the more material
adverse impacts of non-pay inflation including energy costs, experienced in more
recent years, will not be so prevalent over the term of this plan. However, there does
remain the risk that levels of inflation in certain sectors may continue to remain higher
for longer.   
1.4. This plan continues to recognise the risks and volatility in forecasting the potential
financial implications. Therefore, whilst the envisaged scenario remains the most
appropriate for planning purposes, the budget gap range across the potential scenarios
demonstrate the volatility and the extent of the fluctuation possible over the period of
the plan.     
1.5. Continuing the approach taken in recent years through collaborative working, financial
pressures facing adult social care services provided to the IJB will be managed by the
IJB. Therefore, the Council’s MTFP continues to exclude any potential future financial
impacts of providing Adult Social Care Services. However, it should be noted that
Officers in both the Council and IJB will work closely to ensure the IJB has a robust
Financial Plan and Budget Strategy to support financial sustainability over the medium
term.     
1.6. It should be noted that a five year medium term plan continues to remain reasonable
and appropriate for financial planning purposes. 
1.7. Additionally, this report provides an update on the implementation of the key principles
and framework of the Revenue Resources Budget Strategy approved by Policy &
Strategy Committee in June 2019, which have underpinned decision making, ensuring
elected members have information to assist them in making robust and financially
sustainable decisions in setting a balanced budget.  Whilst the existing strategy is
based on sound principles a review to consider further development of the key
principles has been undertaken to ensure the Council continues to develop strategic,
robust and sustainable solutions, to manage the longer term financial challenges. 
1.8. A Revenue Budget Framework to manage the 2025/26 is also provided.  
2. Report 
2.1 The previous MTFP approved by this Committee in June 2023 indicated a three year
gap for the period 2025/26 to 2027/28 of £56.739 million (2025/26, £14.660 million,
2026/27 £18.760 million and 2027/28 £23.320 million).  This position is updated for the
approved 2024/25 budget decisions along with other relevant key changes, whilst
recognising the impact these may have on the demand for services, resources, and
other cost pressures. 
2.2 Appendices 1 to 3 provide summaries for three planning scenarios across the five year
planning period, highlighting the anticipated budget gap for the three year budget
period 2025/26 to 2027/28.  Whilst three planning scenarios have been presented
reflecting sensitivities and volatility in forecasting, the remainder of this report primarily
focuses on assumptions in relation to the envisaged scenario.  These are outlined
below, with a summary of the movements since the previous plan provided at Appendix
4.   
Page 23 of 166

Page 24

Forecast Resources 
2.3 The largest element of the Scottish Budget is the Scottish Block Grant provided by the
UK Government through the Barnett formula. The UK Spending Review is the process
by which the UK Government sets out its plans for public spending.  This provides vital
information for the Scottish Government’s planning assumptions and budget.  The
Spring Statement in March 2024 provided an update on the economy, OBR forecasts,
highlighting a downward trajectory in inflation over the medium term, with the UK’s
inflation rate forecast to fall below 2% target by the end of June, falling to 1.5% next
year.  The next spending review is anticipated to come after the general election. 
Therefore, it should be noted that there is potential for adjustments to both UK and
Scottish Government budgets which would impact this plan. 
Aggregate External Finance (AEF) 
2.4 The Council’s revenue funding consists largely of government funding, Aggregate
External Finance (AEF) equates to approximately 83% of total funding, and is made up
of General Revenue Grant based on the Scottish Government’s assessment of overall
spending needs, Specific Grant and Non-Domestic Rates Income. 
2.5 Estimating future years’ funding with any degree of certainty is challenging, and a slight
variation on funding level can have a significant impact (1% equates to more than
£8.000 million) on the Council’s forecast financial position. 
2.6 Scottish Government published its Resource Spending Review in May 2022, which set
out high level parameters for future Scottish budgets up to 2026/27. This confirmed a
flat lining of resource funding for Local Government at 2022/23 levels, to 2025/26, with
a small increase forecast in 2026/27. In addition, in May 2023, the Scottish Government
published its updated Medium-Term Financial Strategy (MTFS) for the period from
2023/24 to 2027/28, providing insight to future funding and spending priorities at a
national level.  In overall terms, based on the most likely scenario, although the MTFS
indicates increasing taxation, block grant and other revenues over the period to
2027/28, funding is not forecast to keep pace with expenditure demands. The Scottish
Government has therefore reiterated a need for difficult and prioritised spending
decisions to be made across the full period covered by the MTFS.  However, given that
Local Government is unlikely to be prioritised as part of the Scottish Government’s
budget decisions, there is an increasing risk to the previous flat cash commitment. 
2.7 Nonetheless, there is no clarity over this position nor the funding at individual Council
level, or whether this funding will come with additional spending commitments. In the
absence of any further updates this plan continues to assume a flat lining of
government funding.  All three scenarios have been re-baselined to reflect the 2024/25
AEF as reported in the approved 2024/25 budget and updated for subsequent finance
circular movements.  The envisaged scenario assumes no movement in the re-
baselined 2024/25 core grant for the duration of this plan.  The optimistic and
pessimistic scenarios have been flexed to 1% increase/decrease respectively.   
2.8 It should be noted that allocating grant funding to Local Government, the Scottish
Government makes assumption about growth in income from Council Tax, and adjusts
grant funding allocations, accordingly.  This plan assumes the expected flat cash
commitment is net of such adjustment. 
2.9 Members will recall that in setting the budget in February 2024, the Council agreed that
in the event of additional undirected recurring funding being made available for
2024/25, it would be ringfenced to address identified resource gaps.  The Council
Page 24 of 166

Page 25

expects to receive c.£4.000 million representing a share of £62.700 million in relation
to Council’s actions to freeze Council Tax Freeze in 2025/26.  This funding has been
allocated on a one-off basis in 2024/25 to help manage cost pressures which are
estimated to be greater than previously anticipated, such as contract inflation, utilities
and other emerging issues including those linked to the review of the Council’s current
pay and grading model.  These resources available on a recurring basis from 2025/26
onwards and have been recognised in this plan accordingly.  However, these burdens
are in the main recurring and so they too have been recognised in the planning
assumptions, as appropriate. 
2.10 As previously advised by the Depute First Minister, it is assumed that the increased
cost of employers’ contributions to teacher pension costs, will be fully funded.  Both the
increased cost and funding have been incorporated into the 2024/25 position and rolled
forward into the baseline of this plan, on that basis.  Any shortfall in this funding will
have a financial impact.  Therefore an update will be reported in a future Financial
Outlook, if necessary. 
Council Tax 
2.11 Income from Council Tax accounts for around 16% of the Council’s revenue resources
with the estimated income based on a combination of Band D equivalent value,
householder base and the expected rate of collection. 
2.12 In setting the 2024/25 budget, the Council implemented the Scottish Government’s
Council Tax freeze, therefore the Band D charge remains at £1,320.78. 
2.13 The plan continues to reflect increased Council Tax income ring-fenced for the
Community investment fund, which consists of increased funding from ring-fencing
future household growth from regeneration activities and the Council’s ambition, along
with 1% of future increases in Council Tax charges. Therefore, this plan continues to
reflect the commitment to increase Council Tax by 1% to support the Community
Investment Programme. This provides £9.280 million of additional resources over the
five year planning period and £5.460 million over the 3 year budget period. 
2.14 Further increases in Council Tax rates will be a decision for Elected Members. 
However, members will recall the budget motion approved by Council in February 2024
recognised that this Council has the second lowest level of Council Tax across all
Scottish mainland local authorities. Reflecting on the forecast challenging financial
environment in which the Council operates, the Chief Officer (Finance) has been
requested to undertake an analysis of options in relation to a future Council Tax
Strategy for North Lanarkshire.  This is outlined in the Revenue Budget Framework
below.  Whilst there is currently no assumption in this respect within the MTFP reported,
it is important to remember that the smoothing strategy in relation to the 2024/25 budget
assumed Council Tax increases of at least 5% in order to materially reduce the forecast
budget gaps.  A 1% increase in Council Tax is estimated to generate c.£1.770m. 
2.15 In addition to the increase in Council Tax rates noted above, it is also anticipated that
additional income will be generated as a result of household growth. This is expected
to generate an additional £1.700 million of Council Tax income in 2025/26, and £10.310
over the course of the planning period.  This includes assumed additional income from
household growth ringfenced for the CIF programme of £5.310 million. 
Use of Reserves / Resources 
Page 25 of 166

Page 26

2.16 The principles linked to the Revenue Budget Strategy provided later in the report,
continue to allow for prudent and sustainable use of balances to support multi-year
budgeting and help smooth budget gaps, in accordance with the Reserves Policy.  This
also provides for the Change Management Fund which is necessary to support the one-
off costs of approved budget savings to enable a more strategic and sustainable
approach to managing the challenging budget position, allowing time to develop and
implement recurring savings.   
2.17 Therefore, this plan recognises the reversal of the 2024/25 one-off use of reserves of
£5.366 million in 2025/26, which was approved to manage the lead in times in achieving
approved savings for 2023/24 and 2024/25 (£3.400m and £3.501m respectively),
partially offset by £1.535m to replenish reserves as a result of Scottish Government
funding towards the 2023/24 pay award being received in 2024/25.   
Forecast Expenditure & Income Generation 
Employee Cost Pressures 
2.18 Employee costs remain the largest single element of the General Fund budget,
accounting for around 53% of General Fund budgeted expenditure in 2024/25.   Cost
pressures linked to the workforce are therefore material and a key variable which has
the potential to impact significantly on the forecast plan.  Information on the 2024/25
pay negotiations, as well forecast future employee cost pressures is outlined below. 
2.18.1 Pay Award 2024/25
This plan currently assumes the £13.000 million previously provided will be
sufficient to cover the cost of the 2024/25 pay award.  However, as negotiations
are ongoing there remains a real degree of uncertainty in relation to this
assumption and the ultimate cost of any settlement to be borne by Local
Authorities. This also has the potential to impact the baseline position used to
forecast the cost from 2025/26 onwards.  Therefore, this will be kept under
review as the negotiations progress and an update will be incorporated into a
future Financial Outlook, as required. 
2.18.2 Pay Award – Future Years Summary 
For the period of this plan, future pay awards are based on the Council funding
an increase of 2%, reflecting the UK Government inflation target.  Reflecting
these forecast uplifts and the impact of re-baselining previous awards, a total
provision of £11.700 million is estimated for 2025/26.  Total provision over the
next 3 years is anticipated to be £35.000 million.  The optimistic scenario
assumes pay awards will cost the Council 0.5% less than the envisaged
scenario, whilst the pessimistic scenario assumes a 2.5% increase on the
envisaged assumption, thus providing a range for potential pay award of £9.300
million to £23.700 million in 2025/26 or between £26.600 million and £77.700
million over the next 3 years.  Furthermore, as previously advised the plan
includes provision for a permanent reduction in pension contributions as a result
of the most recent triennial revaluation of the Strathclyde Pension Fund.
Reflecting the assumptions on pay award as noted above, a reduction in
pension costs of £4.200m is now anticipated in 2026/27, an increase of £0.400
million from the previously reported position. Pay award assumptions will
remain under review as negotiations continue, and Financial Outlooks will be
updated, as appropriate. 
2.18.3 First Stage of Pay and Grading Model
Page 26 of 166

Page 27

As indicated in the One Workforce report to Policy & Strategy in December
2023, there is a need for the Council to review the pay and grading model to
address a number of workforce challenges. The first stage of changes proposes
a move from the current NLC spinal column points to the national scale, with
employees being matched on a no-detriment basis. It is anticipated that this
move would result in a cost pressure of £2.400m within 2025/26. 
Non Pay Inflationary Pressures 
2.19 The assumptions from 2025/26 onwards reflect on the OBR's most recent economic
forecast at March 2024 and the latest Bank of England forecast for inflation at February
2024, indicating a downward trajectory towards 2% over the medium term.   
2.20 Historically non-pay inflationary uplifts based on forecast relevant inflationary indices,
have only been provided where deemed material and contractual in nature.  This
continues to be the case in this update to the MTFP.  However, it has been
acknowledged that inflation has remained higher for longer than previous economic
forecasts indicated, resulting in actual cost uplifts being greater than previously
assumed.  Therefore, additional budgetary provision of £2.350 million has been
provided on a one-off basis in 2024/25, with recurring provision of £1.650 million from
2025/26 incorporated into this update.  This plan also reflects estimates of future
contract inflationary pressures from 2025/26 of £2.800 million.    As a result, total
contract inflationary pressures of £2.100 million in 2025/26 and £16.760 million over
the period of the plan, are assumed.   
2.21 As previously reported, energy costs increased significantly over recent years resulting
in a material cost pressures.  Committee will recall an additional provision of £10.700
million was provided for 2023/24 on a one-off basis to recognise the real uncertainty in
respect of the recurring cost to the Council.  Following more recent updates, contract
prices negotiated for energy pre-purchased from 2025/26, have reduced.  As a result,
it is considered reasonable to assume the non-purchased elements will also reduce. 
However, given the degree of uncertainty around this it is deemed prudent not to
assume such reduction will be of the same level, therefore a budget reduction of £3.080
million has been assumed from 2025/26.  Thereafter the plan assumes costs will
increase in line with CPI forecasts, totalling £1.748 million from 2026/27 to 2029/30. 
The budgetary requirements for future years will be kept under review with an update
provided in future Financial Outlooks or MTFP updates.   
Other Cost Pressures  
2.22 Within this plan, Continuing Service Pressures (CSPs) of £5.900m over the five year
period have been reflected, primarily in relation to increased cost of ASN activity as a
result of emerging and future demand, together with costs associated with carrying out
Corporate maintenance Electrical Inspection Condition Reports, and reduced income
within Legal and Democratic as a result of legislative and other changes. 
2.23 Other cost pressures totalling £13.310 million over the five years are also provided for.
These predominantly relate to assumed increased costs of Council Tax Reduction
Scheme associated with a Council Tax increase, increased non-domestic rates costs,
and other minor emerging service budget burdens. 
Other Commitments 
Page 27 of 166

Page 28

2.24 There is provision for loan debt costs in relation to the Community Investment
Programme, including City Deal, which equates to £2.790 million in year 1 of the plan
and £15.760 million across the planning period. 
2.25 In addition, this plan recognises that the updated forecast loan charge costs when
compared with existing budgetary provision indicates there is a requirement to increase
the budget commencing in 2025/26, mainly as a result of previously approved non-
recurring loan debt re-profiling savings and increased interest rate costs.   This plan
also includes the additional the borrowing cost in relation to the £45.000 million capital
investment added to the recently approved 5 year capital programme, arising from the
retrospective application of the change in accounting for existing service concessions
in 2024/25. However, the plan also recognises the uncertainty in forecasting precisely
when the budget will be required due to a number of variables, including the spend
profile of the capital programme.  Therefore, it is deemed prudent to smooth the overall
increased budgetary requirement over a longer period.  This means that a combination
of one-off earmarked reserves and recurring budget provision, is deemed necessary to
manage and demonstrate affordability of current capital investment plans currently
approved.  This will result in a build-up of one-off resources in early years with a
requirement to drawdown in future years.  Thus, an additional recurring £0.600 million
has been provided for in 2025/26 and a total of £2.400 million over the planning period,
which equates to and overall provision of £10.700 million over the planning period.   
2.26 The MTFP reported in June 2023 incorporated a saving of £4.500 million for the five
years in respect of the funding for PPP contract obligations.  It was recognised that
additional budgetary provision would require to be incorporated into future MTFPs. 
Therefore, year five of this plan reflects an additional cost of £1.000 million.  Further
additional financial consequences will be recognised in future Financial Outlooks or
MTFPs. 
Sales, Fees & Charges 
2.27 One of the key principles of the Revenue Budget Strategy outlined below, is that
maximising income should be considered, with future charging models for services to
be informed by benchmarking and the principles of full cost recovery, where
appropriate.  To assist with moving towards full cost recovery and in recognition of
inflationary impacts affecting costs for services, the plan assumes additional income
generation for discretionary charges of £1.000 million in 2025/26, in line with the
approved policy to uplifted prices by 5% each year. The optimistic and pessimistic
scenarios assume a slightly adjusted base for 2025/26 of £1.250million and £0.750
million, respectively. 
2.28 As approved at Council on 15 February 2024 members are reminded a review in
respect of discretionary fees and charges is to be undertaken to accelerate the move
to full cost recovery where possible.  The outcome of this review will be reported to
Committee in due course.  Any additional financial implications arising from this review
will be incorporated into a future Financial Outlook. 
Updated Medium Term Financial Forecast 
Approved Savings / Advance Action 
2.29 In line with the Revenue Budget Strategy and the principle to consider a three year
rolling revenue budget, 3 years of base budget adjustments were approved by Council
on the 23 February 2023.  These savings result in minor savings of £0.210 million for
2025/26.    
Page 28 of 166

Page 29

2.30 This plan assumes all other previously approved savings will be fully achieved. 
Committee should note that updates in this regard will be provided to future meetings
and amendments to the Financial Plan will be made accordingly.
Strategic Use of Balances 
2.31 Members will recall the approved budget set in February 2024 agreed savings of
£9.621 million, with £6.120 million to be achieved in 2024/25, and £2.283 million and
£1.218 million to be delivered in 2025/26 and 2026/27 respectively.  The timing and
delivery of the savings required one-off use of balances of £4.719 million across
2025/26 and 2026/27, which is recognised in this plan.    
2.32 The Council’s unallocated balances continue to be closely monitored and as outlined
below, a key principle of the Revenue Budget Strategy and the Revenue Budget
Framework, is that planned and sustainable use of available balances will be
considered, in line with policy, and in accordance with a budget strategy recommended
by the S95 Officer.  Until this strategy is developed the additional call on these balances
is currently unknown. 
Summary – Medium Term Financial Forecasts 
2.33 In summary, the envisaged scenario indicates a budget gap of £100.084 million over
the five year planning period and £61.976 million for the three year budget period
2025/26 to 2027/28.  Further details are contained within Appendix 1.  Appendices 2
and 3, summarise the forecast pessimistic and optimistic scenarios indicating the gap
could range between £21.758 million and £225.518 million, over the five years. 
2.34 Appendix 4 provides a high level summary of the movements between this plan and
the previous plan reported to Committee in September 2022. 
Proposed Additional Advance Action & Council Tax Strategy 
2.35 As part of the 2024/25 budget setting, it was recognised that further action would be
required to address significant forecast budget gaps in 2025/26 and 2026/27. To
address this, approval was given to carry out a series of service reviews which should
include identifying savings options or income generation opportunities. These reviews
include:
a) Review of the Council’s approach to facilitate Community Asset Transfers
b) In line with the approved Discretionary Fees and Charges Policy acceleration of
the move to full cost recovery where possible
c) Review of the provision of First Stop Shops, non-school catering functions, Land
& Waste, Revenues & Benefits and Business & Digital, to ensure that they are
fit for purpose and represent Best Value for the Council.
d) Review of the functions and strategic direction of the Council’s remaining ALEOs
(Routes to Work, Fusion Assets and North Lanarkshire Properties) to ensure
that they continue to contribute to the delivery of the Council’s strategic
priorities. 
2.36 In line with the Revenue Budget Framework outlined below, Council officers will work
with Elected Members to ensure options for potential solutions are presented to enable
the Council to address the budget gap in each financial year and to meet its legal
obligation to set a balanced budget.  Members will recall the budget smoothing strategy
proposed by the S95 Officer in setting the 2024/25 budget made an assumption around
Council Tax increases over the three year period, with the potential to materially reduce
the forecast budget gaps and therefore ultimately the savings requirement.  Should a
Page 29 of 166

Page 30

similar approach be recommended for the 2025/26 to 2027/28 three year budget,
members are reminded that an annual Council Tax increase between 5% and 10% is
estimated to generate additional income between £6.880 million £17.200 million.  The
equivalent of £20.640 million and £51.600 million over a three year planning period. 
Risks and Uncertainties 
2.37 Whilst the assumptions applied to income and expenditure projections in this financial
plan are based on the best information available at the time of writing, they are
inherently uncertain.  The key factors which are likely to impact upon the Council’s
assumptions and future financial plans have been discussed throughout the report,
including the significant uncertainty in relation to the Council’s funding settlement and
uncertainty in assumed cost of pay awards.  There are also a number of political factors
which may impact on planning assumptions, including potential changes at UK and
Scottish Government levels as a result of elections, the Scottish Government’s
commitment to a National Care Service and the financial consequences of this on Local
Government, along with climate change commitments. 
2.38 Other current notable risks previously reported include; 
2.38.1 Ash tree dieback linked to a disease which could cause significant damage to
the UK’s ash population.  As has been previously recently reported to
Committee, there has been some capital funding allocated to support the cost
in managing the diseased species.  However, there is a still a risk that revenue
resources are required in respect of this issue.   
2.38.2 Committee are also reminded of Scottish Government’s plans to review the
Capital Accounting arrangements and statutory mitigations in respect of such,
to ensure they remain fit for purpose. Statutory interventions override the
CIPFA Code of Practice for Local Authority Accounting. The Scottish
Government consulted on draft changes at the end of 2023 and have since
issued a draft revised circular for comment by 30 April 2024.  Whilst the draft
circular does not contain some of the more contentious issues proposed in the
original consultation, it is still understood that the plan is to comprehensively
review existing statutory arrangements, with a view to reducing reliance on
statutory mitigations and offer greater alignment with international accounting
standards. This continues to cause real concerns and Local Authority
Directors of Finance and COSLA continue to seek engagement on such plans.
Removing existing statutory mitigations will have material financial
consequences on revenue budgets and ultimately potentially impacting on
capital investment programmes. 
Revenue Budget Strategy Update 
2.39 As indicated in paragraph 1.7 above the key principles and framework of the Revenue
Resources Budget Strategy approved in June 2019 have underpinned financial plans
to ensure robust and financially sustainable decisions have been taken in setting the
revenue budget.  This report gives a further update on the implementation of such
principles and how they have largely become embedded in the financial planning and
budget process.    In addition, whilst the existing strategy and principles are soundly
based a review has been undertaken to consider the continued relevance of such
principles in order to further develop and enhance them to ensure the Council can
continue to manage the challenges it faces, minimising cost and maximising resources,
efficiencies and savings, in both the near and longer term. A summary of the
implementation and review of the principles is provided at Appendix 5.
Page 30 of 166

Page 31

2.40 As outlined in Appendix 5, following the review of the principles seven key principles
are recommended, which will continue to underpin future financial strategies and
decision making.  These are summarised below along with some additional information
to give context to application of such revised principles; 
1) Revenue funding will be directed to the Council’s key priorities 
Integration of the Plan for North Lanarkshire and the Financial Plan will ensure
that resources are directed towards the key priorities and that current service
delivery is prudent, affordable and sustainable.  Services should manage
allocated revenue resources effectively and ensure delivery of previously
approved savings, whilst managing unmet budget burdens, thus enabling net
allocated revenue resources to be directed to delivery of current service
provision. The Programme of Work is critical to delivery of the financial strategy,
driving change and future financial efficiencies and savings. Any requirement for
new or enhanced services should be reported either through appropriate
committees or part of the budget process, to ensure there is a coherent decision-
making strategy and prioritisation of resources, particularly given the ongoing
future financial challenges the Council faces. 
2) Three year rolling budgets will be developed 
A strategy to manage the position in line with the Revenue Budget Framework
will be recommended by the S95 Officer. It is recognised the strategy will require
a combination of solutions and initiatives to close future budget gaps, and that
mixture of shorter and longer term initiatives may be required, some of which will
not deliver early financial benefits due to longer lead times.  This will include the
continued need for all Services to identify and deliver savings. 
3) Service delivery should remain under continuous review to ensure the
Council delivers best value and efficient services 
Service design and delivery reviews should be informed by benchmarking and
where appropriate reported for approval through a relevant Committee, in
accordance with the Scheme of Administration. This will support the Council in
its statutory duty to provide best value, inform decision making and allow the
financial implications to be incorporated timeously into the MTFP or Financial
Outlooks.  Such reviews should enable service performance to be compared with
other peer Local Authorities, aiming to minimise cost, maximising income
generation and potentially generating financial savings .  These reviews may
mean re-prioritisation or a change in service performance, to enable the Council
to deliver more of the existing services, for longer.   
The Revenue Budget Framework aims to ensure there is a cohesive and joined
up approach to consideration of savings, particularly where these are
crosscutting.  Such an approach to decision making will require strong and
effective leadership, to ensure the Council remains financially sustainable. 
4) Maximising income generation should be considered   
The opportunities to maximise income generation should be informed by
benchmarking, where appropriate, and should include implementing a Council
Tax Strategy to maximise revenue resources available for service priorities.  All
future charging models should be informed by the principle of full cost recovery.
Page 31 of 166

Page 32

Once charges are established on this basis, future increases will be index-linked
in line with approved policies. 
5) Planned and sustainable use of available balances will be considered in line
with policy 
Sustainable use of balances will be considered where it is prudent and affordable
and in line with the Reserves Policy and the provisions contained in the Revenue
Budget Framework outlined below.  This may include managing the financial
impact of a budget strategy, as recommended by the S95 Officer, with the aim to
close future budget gaps and to support the timing of delivering approved
savings. 
6) Members and other key stakeholders will be actively involved in the budget
process 
The financial pressures facing the Council means Councillors need to make
difficult decisions. To manage these challenges requires effective political
leadership and communications. It is essential that all Councillors, and other key
stakeholders as deemed appropriate, work effectively with officers to identify and
deliver necessary savings or alternative solutions, to and meet the statutory
requirement to set a balanced budget.   
7) Consideration will be given to proposals to fully implement the use of
participatory budgeting and opportunities to meet statutory requirements
under the Community Empowerment (Scotland) Act 2015 
The outcome of such considerations will inform members’ decisions around the
solutions to ensure the Council continues to manage the budget challenges it
faces. 
Revenue Budget Framework 
2.41 Aligned to the MTFP and Revenue Budget Strategy principles, Table 2 below provides
an outline framework to govern the 2025/26 budget process and to ensure that the
Council manages the rolling three year budget forecast position as reported in the
annual MTFP, in a robust and timely manner.  This framework will be reviewed
annually.
Table 2 
Action Detail Responsibility Timeline
Annual update
of MTFP to P&S
Committee 
Review and update the assumptions of the
MTFP to ensure the Council has a robust an
up to date forecast financial plan.
S95 Officer Committee
Cycle 2 
Update & Report
Financial
Outlooks
Ongoing review of financial plan
assumptions and provision of updated
Financial Outlooks for material changes. 
These will be reported as part of the budget
engagement and / or an update provided to
Committee, as deemed appropriate.
S95 Officer Ongoing
between June
2024 and 
January 2025
Report on
Delivery of
Approved
Savings
Updates reported to Finance & Resources
Committee to approved savings are on
target to deliver approved financial savings.
Chief Officers/
S95 Officer
Committee
Cycle 3 2024 &
Cycle 1 2025
Page 32 of 166

Page 33

Budget Strategy
to Manage the 3
Year Position
(e.g. smoothing)
The S95 Officer will consider the updated
three gap and recommend a strategy to
manage the position.  This strategy will give
due consideration to the scale of the
challenge and the overall level of
unallocated reserves available to support
the position, and in line with the Reserves
Policy. 
S95 Officer September
2024
All Member &
Trade Union
Engagement
Ongoing engagement to keep key
stakeholders informed of the financial
position and to support with decision making
to set a balanced budget.
Chief Executive
& S95 Officer
Min. March,
June,
September,
December 2024
Strategic Service
Reviews
As approved by Council in February 2024 a
series of service reviews which should
include identifying savings options or income
generation opportunities will be undertaken
and reported Committee, as required.
Depute Chief
Executive
Reported to
relevant
committees in
due course
Council Tax
Strategy Report 
The budget motion approved by Council in
February 2024 recognised that this Council
has the second lowest level of Council Tax
across all Scottish mainland local
authorities. Therefore, reflecting on the
forecast challenging financial environment in
which the Council operates, the Chief Officer
(Finance) has been requested to undertake
an analysis of options in relation to a future
Council Tax Strategy for North Lanarkshire.
S95 Officer Report to Policy
& Strategy
Committee in
Cycle 3 2024
Review other
Councils’
approaches to
identification of
savings
Aligned with Principle 2 & 3 above and
informed by benchmarking; research other
LAs approach to savings to ensure NLC
maximises all opportunities for efficiencies,
savings, or income generation.
CMT October 2024
Refresh of
existing in-
scope budget
savings options
Officers will ensure there is a current list of
options to support members decision
making in closing future budget gaps, as
required. 
Chief Officers/
Finance Teams
Ongoing
Budget Report
to Council
An update on the three-year financial
forecast will be reported to Council which will
incorporate the Council’s grant settlement as
indicated by Scottish Government.  
S95/ Political
Groups 
3. Measures of success 
Measures of success will include: 
3.1 Development of solutions aligned to the Council’s strategic objectives outlined in 
the Plan for North Lanarkshire.
3.2 Setting of a balanced budget for 2025/26 and subsequent years.
3.3 Successful and timeous implementation of approved solutions. 
4. Supporting documents
Appendix 1 Envisaged Scenario
Appendix 2 Pessimistic Scenario
Appendix 3 Optimistic Scenario
Appendix 4 Summary of Movements
Appendix 5 Review of Principles of Revenue Resources Budget Strategy
Page 33 of 166

Page 34

Elaine Kemp
Chief Officer (Finance) 
Page 34 of 166

Page 35

5. Impacts
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 35 of 166

Page 36

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 36 of 166

Page 37

Envisaged Scenario Appendix 1
2025/26 2026/27 2027/28 2028/29 2029/30
£000s £000s £000s £000s £000s
Anticipated Cost Pressures 18,910 14,766 17,175 17,473 18,075
Pay Award 11,700 11,600 11,700 11,900 12,200
Pension Costs 0 (4,200) 0 0 0
Other Employee Costs; first stage of pay and grading model 2,400 0 0 0 0
Contract Inflation 2,100 3,240 3,760 3,760 3,900
Energy Costs (3,080) 416 424 433 475
CSP's 3,400 2,500 0 0 0
Other Cost Pressures 3,390 2,260 2,400 2,540 2,720
Income Generation- Fees & Charges (1,000) (1,050) (1,110) (1,160) (1,220)
Other Commitments 4,290 6,290 5,890 5,990 5,000
City Deal Commitments 290 290 290 290 0
Community Investment Fund 2,500 2,700 3,000 3,000 3,400
Loan charges reprofiling 2,400 2,400 2,600 2,700 600
PPP Contract Obligations 0 0 0 0 1,000
SPF cost reduction (900) 28,300 0 0 0
New Investment; Community Hubs CFCR 0 (23,416) 0 0 0
Use of one off to smooth budget 0 (3,984) 0 0 0
Total Cost Pressures 23,200 21,056 23,065 23,463 23,075
Less:
Resource Forecasts 1,935 3,720 3,970 4,030 4,400
AEF adjustments - Core (1,535) 0 0 0 0
1% Council Tax Increase; CIF 1,770 1,820 1,870 1,930 1,890
Net Council Tax Growth inc. rebaselining adj in year 1 1,700 1,900 2,100 2,100 2,510
Budget Gap before carry fwd of unresolved gap & advanced
action 21,265 17,336 19,095 19,433 18,675
Unresolved Recurring Budget Gap B/fwd 6,025 3,984 0 0 0
Revised Budget Gap before advanced action 27,290 21,320 19,095 19,433 18,675
Approved Advance Action (5,729) 0 0 0 0
Approved Base Budget Adjustments (210) 0 0 0 0
Proposed Base Budget Adjustments 0 0 0 0 0
2023/24 Approved Savings now applied (3,400) 0 0 0 0
2024/25 Approved Savings now applied (2,283) (1,218) 0 0 0
Use of Reserves for delayed 2023/24 approved savings 0 0 0 0 0
One-off Use of Reserves for delayed 2024/25 approved savings (1,218) 0 0 0 0
2023/24 Reversal of use of reserves for delayed saving 3,400 0 0 0 0
Reversal of previous years use of reserves for delayed saving 3,501 1,218 0 0 0
23/24 Pay Award One-Off Funding - Replenish Reserves (1,535) 0 0 0 0
One-off Use of Resources supported by SPF Cost Reduction (3,984) 0 0 0 0
Budget Gap after approved advanced action 21,561 21,320 19,095 19,433 18,675
3 year total (25/26 to 27/28) 61,976
Page 37 of 166

Page 38

Pessimistic Scenario Appendix 2
2025/26 2026/27 2027/28 2028/29 2029/30
£000s £000s £000s £000s £000s
Anticipated Cost Pressures 35,998 30,891 34,574 35,923 37,527
Pay Award 23,700 26,500 27,500 28,700 30,000
Pension Costs 0 (4,400) 0 0 0
Other Employee Costs; first stage of pay and grading model 2,400 0 0 0 0
Contract Inflation 5,180 4,010 4,570 4,620 4,790
Energy Costs (1,332) 671 693 714 737
CSP's 3,400 2,500 0 0 0
Other Cost Pressures 3,400 2,400 2,640 2,760 2,920
Income Generation- Fees & Charges (750) (790) (830) (870) (920)
Other Commitments 3,480 7,680 6,180 6,280 5,000
City Deal Commitments 580 580 580 580 0
Community Investment Fund 2,500 2,700 3,000 3,000 3,400
Loan charges reprofiling 2,400 2,400 2,600 2,700 600
PPP Contract Obligations 0 0 0 0 1,000
SPF cost reduction (2,000) 29,400 0 0 0
New Investment; Community Hubs CFCR 2,041 (23,416) 0 0 0
Use of one off to smooth budget (2,041) (3,984) 0 0 0
Total Cost Pressures 39,478 38,571 40,754 42,203 42,527
Less:
Resource Forecasts (6,600) (4,720) (4,380) (4,240) (3,790)
AEF adjustments - Core (10,070) (8,440) (8,350) (8,270) (8,190)
1% Council Tax Increase; CIF 1,770 1,820 1,870 1,930 1,890
Net Council Tax Growth inc. rebaselining adj in year 1 1,700 1,900 2,100 2,100 2,510
Budget Gap before carry fwd of unresolved gap & advanced
action 46,078 43,291 45,134 46,443 46,317
Unresolved Recurring Budget Gap B/fwd 6,025 3,984 0 0 0
Revised Budget Gap before advanced action 52,103 47,275 45,134 46,443 46,317
Approved Advance Action (5,729) 3,984 0 0 0
Approved Base Budget Adjustments (210) 0 0 0 0
Proposed Base Budget Adjustments 0 0 0 0 0
2023/24 Approved Savings now applied (3,400) 0 0 0 0
2024/25 Approved Savings now applied (2,283) (1,218) 0 0 0
Use of Reserves for delayed 2023/24 approved savings 0 0 0 0 0
One-off Use of Reserves for delayed 2024/25 approved savings (1,218) 0 0 0 0
2023/24 Reversal of use of reserves for delayed saving 3,400 0 0 0 0
Reversal of previous years use of reserves for delayed saving 3,501 1,218 0 0 0
23/24 Pay Award One-Off Funding - Replenish Reserves (1,535) 0 0 0 0
One-off Use of Resources supported by SPF Cost Reduction (3,984) 3,984 0 0 0
Budget Gap after approved advanced action 40,349 47,275 45,134 46,443 46,317
3 year total (25/26 to 27/28) 132,758
Page 38 of 166

Page 39

Optimistic Scenario Appendix 3
2025/26 2026/27 2027/28 2028/29 2029/30
£000s £000s £000s £000s £000s
Anticipated Cost Pressures 13,560 10,160 12,421 12,543 12,883
Pay Award 9,300 8,600 8,700 8,800 9,000
Pension Costs 0 (4,100) 0 0 0
Other Employee Costs; first stage of pay and grading model 2,400 0 0 0 0
Contract Inflation 1,610 2,480 2,970 2,930 3,000
Energy Costs (4,830) 160 161 163 164
CSP's 3,400 2,500 0 0 0
Other Cost Pressures 2,930 1,840 1,970 2,100 2,240
Income Generation- Fees & Charges (1,250) (1,320) (1,380) (1,450) (1,520)
Other Commitments 4,490 6,090 5,890 5,990 5,000
City Deal Commitments 290 290 290 290 0
Community Investment Fund 2,500 2,700 3,000 3,000 3,400
Loan charges reprofiling 2,400 2,400 2,600 2,700 600
PPP Contract Obligations 0 0 0 0 1,000
SPF cost reduction (700) 28,100 0 0 0
New Investment; Community Hubs CFCR 2,041 (23,416) 0 0 0
Use of one off to smooth budget (2,041) (3,984) 0 0 0
Total Cost Pressures 18,050 16,250 18,311 18,533 17,883
Less:
Resource Forecasts 10,470 12,330 12,660 12,810 13,270
AEF adjustments - Core 7,000 8,610 8,690 8,780 8,870
1% Council Tax Increase; CIF 1,770 1,820 1,870 1,930 1,890
Net Council Tax Growth inc. rebaselining adj in year 1 1,700 1,900 2,100 2,100 2,510
Budget Gap before carry fwd of unresolved gap & advanced
action 7,580 3,920 5,651 5,723 4,613
Unresolved Recurring Budget Gap B/fwd 6,025 3,984 0 0 0
Revised Budget Gap before advanced action 13,605 7,904 5,651 5,723 4,613
Approved Advance Action (5,729) 0 0 0 0
Approved Base Budget Adjustments (210) 0 0 0 0
Proposed Base Budget Adjustments 0 0 0 0 0
2023/24 Approved Savings now applied (3,400) 0 0 0 0
2024/25 Approved Savings now applied (2,283) (1,218) 0 0 0
Use of Reserves for delayed 2023/24 approved savings 0 0 0 0 0
One-off Use of Reserves for delayed 2024/25 approved savings (1,218) 0 0 0 0
2023/24 Reversal of use of reserves for delayed saving 3,400 0 0 0 0
Reversal of previous years use of reserves for delayed saving 3,501 1,218 0 0 0
23/24 Pay Award One-Off Funding - Replenish Reserves (1,535) 0 0 0 0
One-off Use of Resources supported by SPF Cost Reduction (3,984) 0 0 0 0
Budget Gap after approved advanced action 1,851 3,920 5,651 5,723 4,613
3 year total (25/26 to 27/28) 11,422
Page 39 of 166

Page 40

Appendix 4
Summary Movements from Previous MTFP
2025/26
£000
2026/27
£000
2027/28
£000
2028/29
£000
Total
£000
Gap per approved MTFP June 2023 14,660 18,760 23,320 20,941 77,681
Action Approved
Adjustments to Pay Assumptions 2024/25-2026/27 (200) (2,100) 0 0 (2,300)
Reduction in Employers Pension Contributions 0 (3,800) 0 0 (3,800)
Reversal of One-off funding for 2023/24 Pay Award 0 1,535 0 0 1,535
2023/24 Pay Awared One-off; Replenish Reserves 0 (1,535) 0 0 (1,535)
Reversal of One-off reduction for 2024/25 Pension Contributions 27,400 27,400 0 0 54,800
Reversal of one-off CFCR approved for 24/25 (21,375) (23,416) 0 0 (44,791)
25/26 One-Off reduction in Pension Contributions (27,400) 0 0 0 (27,400)
One-off CFCR approved for 25/26 23,416 0 0 0 23,416
25/26 Approved Savings (2,283) (1,218) 0 0 (3,501)
Reverse previous year use of reserves to balance unresolved gap 3,501 1,218 0 0 4,719
One of use of reserves to support delivery of savings (1,218) 0 0 0 (1,218)
1,841 (1,916) 0 0 (75)
Revised Gap February 2024 16,501 16,844 23,320 20,941 77,606
Updated assumptions April 2024
Cost Pressures
Pay Award (100) (1,100) (6,500) (3,800) (11,500)
Pension Costs 0 (400) 0 0 (400)
Other Employee Costs; first stage of review of pay and grading model 2,400 0 0 0 2,400
Contract Inflation 950 990 600 510 3,050
Energy (3,080) 416 424 433 (1,807)
CSPs 3,400 2,500 0 0 5,900
Other Cost Pressures 2,270 1,090 1,210 1,350 5,920
Income Generations - Sales, Fees & Charges (480) (520) (559) (600) (2,159)
One-off reduction in Pension Contributions (900) 900 0 0 0
Loan Charges 600 600 600 600 2,400
Revised MTFP Gap 21,561 21,320 19,095 19,433 81,409
Movement 5,060 4,476 (4,225) (1,508) 3,803
Page 40 of 166

Page 41

Appendix 5
Update on Implementation of the Principle Review of Principle New or Enhanced Principle
i. Future budgets will be developed to cover a rolling three year
period. The Revenue Resources Budget for the 3 year period
will take account of all opportunities flowing from the Plan for
North Lanarkshire and the associated Programme of Work,
ensuring full integration of the Plan and the budget. A longer
term approach to the budget process will provide for longer
term planning and delivery of more complex projects, linked to
the Plan to deliver efficiencies and savings over an extended
period.
The Council continues to consider 5 years as an appropriate
timeframe for financial planning purposes but the focus for budget
setting is three years.  This principle remains sound but is increasingly
difficult to implement particularly in light of continued one year financial
settlements from the Scottish Government. There is also an ever
increasing risk associated with estimating the level of funding
available for Local Government in Scotland and a greater degree of
risk associated with inflationary pressures, including future costs of
pay awards.  This makes planning for the longer term and taking a
more strategic approach to savings and other solutions to manage
the financial position, more difficult to implement.  Therefore, whilst
this Council is fully committed to this key principle the focus has been
on setting a balanced budget for single year.   However it should be
noted that this principle has assisted with the effective implementation
of the financial strategy to  ensure effective decisions are taken to
deliver significant savings over more than one year, and support of
the ongoing challenge to ensure the Council remains financially
sustainability.   
The focus of this principle is the period to be
considered for budget setting purposes and the
solutions to manage the position.  Therefore, the
principle should be compressed to give it that focus. 
The alignment and integration of the Financial Plan
and the Plan for North Lanarkshire is more fully
reflected in principle ii) & iv).
Three year rolling budgets will be developed; a
strategy to manage the position in line with the
Revenue Budget Framework will be recommended
by the S95 Officer. It is recognised the strategy will
require a combination of solutions and initiatives to
close future budget gaps, and that mixture of shorter
and longer term initiatives may be required, some of
which will not deliver early financial benefits, due to
longer lead times.  This will include the continued
need for all Services to identify and deliver savings.
ii. Budgets will be clearly linked to the achievement of Council
priorities.
As previously reported, the financial plan continues to ensure there is
alignment with the Plan for North Lanarkshire and the corporate
objectives and priorities.  The MTFP Plan continues to assume that
any financial implications arising from the Plan for North and
associated Programme of Work will be managed within existing
resources.  However, the governance arrangements in reporting on
PoW activity ensure any additional financial consequences are
captured and reported through the relevant channels.  This will ensure
all costs and savings are clearly reported and incorporated into the
MTFP.  The budget strategy to manage the financial position also
ensures that appraisal of savings options distinguishes between
those related to statutory and discretionary responsibilities, to ensure
resources are targeted towards delivery of Council priorities and
statutory requirements.
This principle closely aligns with principle iv) below. 
Therefore, principle ii) and iv) should be merged to
reflect the direct linkage with the opportunities that
are anticipated to flow from the Programme of Work
and drive decisions to ensure budgets are linked to
Council priorities.
Integration of the Plan for North Lanarkshire and the
Financial plan will ensure that resources are directed
towards key priorities and that current service
delivery is prudent, affordable and sustainable. 
Services should manage allocated revenue
resources effectively and ensure delivery of
previously approved savings, whilst managing unmet
budget burdens, thus enabling net allocated revenue
resources to be directed to delivery of current
service provision. The Programme of Work is critical
to delivery of the financial strategy, driving change
and future financial efficiencies and savings. Any
requirement for new or enhanced services should be
reported either through appropriate committees or
part of the budget process, to ensure there is a
coherent decision-making strategy and prioritisation
of resources, particularly in light of the ongoing
future financial challenges the Council faces.
Key Principles
Revenue Resources Budget Strategy Progress Update & Review of Key Principles
Page 41 of 166

Page 42

Appendix 5
Update on Implementation of the Principle Review of Principle New or Enhanced Principle
iii. The identification of savings opportunities will remain under
continuous consideration rather than being restricted to
deliberation as part of the annual budget setting exercise.
Approval from appropriate Committees will be sought as
savings are identified, allowing consideration by elected
members well in advance of the annual budget setting meeting.
The identification and approval of savings will become an
integral part of normal Committee activity.
The Council remains committed to this principle.   However, it should
be acknowledged that a key savings report was approved during
financial year 2023/24, which was subsequently reversed.  The
Council needs to learn lessons from this and the challenge to ensure
there is adequate public and member communications to help aid
understanding and support for proposed decisions, and the impact of
not taking such difficult decisions, in order to manage the ongoing
financial sustainability challenges.
This remains a sound and essential principle which
must become more embedded in Council's decision
making processes throughout the year.  Therefore
there needs to be a shift emphasis on the ongoing
requirement to review service deliver models to
ensure the Council continues to provide best value
services thus ensuring services are efficient as
possible, therefore potentially generate
financial savings.  This will help the Council to
continue to provide and protect the services for the
community it serves.  It is important that this
principle is reinforced to ensure effective leadership
in managing the challenging financial position the
Council continues to face, ensuring members can
make timely decisions and managing the overall
financial position of the Council.
Service design and delivery should remain
under continuous review to ensure the
Council delivers best value and efficient
services, potentially generating financial
savings or income generating opportunities;
such reviews should be informed by benchmarking
and were appropriate reported for approval through
a relevant Committee.  This will support the Council
in its statutory duty to provide best value and enable
operational delivery levels to be compared with other
peer Local Authorities, to inform decision making
and for any financial implications to be incorporated
into the MTFP/ Financial Outlooks more timely. 
These reviews may mean re-prioritisation or change
in service performance, to enable the Council to
deliver more of our existing services for longer.   The
Revenue Budget Framework should ensure that
there is a cohesive and joined up approach to
consideration of savings particularly where there are
crosscutting proposals.  Such approach to decision
making will help demonstrate strong and effective
leadership, to ensure the Council remains financially
sustainable.
iv. Opportunities for service redesign which will inevitably flow
from the Plan for North Lanarkshire and the associated
Programme of Work will become the new drivers of future
years’ savings.
Consideration of Service redesign continues to identify savings
options to improve efficiency and reduce the Council's asset base
where appropriate.  In addition,  income generation opportunities and
other service restructures, have contributed to managing the
challenging financial position, in support of the Council's budget
strategy.
This principle closely aligns with principle ii) above. 
Therefore, it is proposed to merge both principles to
reflect the direct linkage with the Council's objectives
of the Plan for North Lanarkshire, and recognise the
opportunities which are anticipated to flow from the
Programme of Work, which should help drive
decisions and ensure budgets are linked to Council
priorities.
Merged with ii) above
v. Services must ensure full understanding and recognition of the
revenue consequences of future capital investment decisions
to enable capital and revenue budget plans which are fully
integrated. This will facilitate the development of an approach
to growth which meets the objectives of the Community
Investment fund by ring fencing elements future of Council Tax
increases.
The key principles of the Council's Capital Strategy reflect the
requirement to ensure revenue consequences are embedded in the
decision making around Community Investment decisions, ensuring all
recurring revenue consequences are considered.  The Policy &
Strategy Committee of 14 March 2024 approved the new Strategic
Capital Investment Programme 2024/25 to 2028/29.   In accordance
with Prudential Code requirements, the Council carries out ongoing
reviews of the Capital Strategy. Therefore, an updated Capital
Strategy was also presented to Committee outlining the framework
used to develop the new programme, which remain largely unchanged
from the previous iteration.  Due consideration of the recurring
revenue consequences was fully reflected in the evaluation of capital
proposals and assessed to be managed within existing revenue
budgets.
As this principle is now more embedded in the 
capital Strategy and associated decision making
processes reflect good financial management and
decision making in accordance with financial
regulations, then is it is proposed that this principle
be removed from the Revenue Budget Strategy.
Key Principles
Revenue Resources Budget Strategy Progress Update & Review of Key Principles
Page 42 of 166

Page 43

Appendix 5
Update on Implementation of the Principle Review of Principle New or Enhanced Principle
vi. Future charging models for services provided will be informed
by benchmarking and the principles of full cost recovery. Once
costs are established on this basis, future increases will be
index-linked. Additionally, consideration will be given to
appropriate revenue generating opportunities.
As previously advised there has been attempts made to move
towards full cost recovery, for example in relation to school meal
prices, burial charges and the introduction of charges for services
such as community alarms. However, the recent challenging
economic climate including high inflation has made it increasing
difficult to deliver previously approved income generation targets or to
undertake further development work to ensure this principle is fully
embedded. In support of this principle and in particular that charges
should be indexed linked, the Policy & Strategy Committee in
September 2023 approved the new Discretionary Fees and Charges
Policy, which includes provision for a 5% annual uplift on charges.  It
should be recognised however that as a result in high inflation in
recent years some costs have risen materially therefore potentially
resulting in some charges being further adrift from full cost recovery
than they were previously.  Services must ensure compliance with the
policy and are required to carryout an annual review of discretionary
charges by the end of April each year to assess compliance with the
full cost recovery principle.  The outcome of the annual review is to be
reported to the Section 95 Officer summarising any financial
implications, and any material shortfalls in compliance, which may
require to be considered as part of the budget setting process or a
separate report to Committee, in line with principle iii) above and the
need to minimise cost and maximise income generation opportunities.
There should be a shift in emphasis from focussing
on full cost recovery in relation to sales, fees &
charges, to maximising all income generating
opportunities including Council Tax, which after
government grant is the most significant income
receivable by the Council.  There also needs to be a
greater emphasis on reviews to be informed by
benchmarking allowing for full consideration of
performance and service delivery levels relative to
peer authorities.
Maximising all income generating
opportunities should be considered;  including
implementing a Council Tax Income Strategy to help
maximise resources available for service delivery. 
All future charging models should be informed by
benchmarking, where appropriate, and the principles
of full cost recovery. Once charges are established
on this basis, future increases will be index-linked in
line with approved policies.
vii. Consideration will continue to be given to the planned,
sustainable use of available balances.
The Council's continues to comply with the approved Reserves Policy. 
Financial Solutions continue to ensure financial plans reflect demands
for future one-off resource requirements.  This includes change
management fund requirements to meet the one-off costs savings. 
An update on forecast costs was included in the 2024/25 budget
setting report.  In addition, as part of the close down of the financial
year a review of other one-off resource requirements is undertaken
and reserves earmarked as applicable.  The position in respect of
these reserves will continue to be reported within the revenue
monitoring reports.  Implementation of this principle is essential to
demonstrate the affordability and sustainability of approved plans and
associated one-off costs.  
This principle remains essential to the Revenue
Budget Strategy.  Minor change to reflect the
requirement to align with policy.
Planned and sustainable use of available
balances will be considered in line with policy; 
this includes consideration of use of balances in
accordance with provisions contained in the
Revenue Budget Framework such as managing the
financial impact of any agreed smoothing or other
strategy approved by the S95 Officer, to help close
future budget gaps and lead in times for approved
savings, where it affordability can be demonstrated.
Key Principles
Revenue Resources Budget Strategy Progress Update & Review of Key Principles
Page 43 of 166

Page 44

Appendix 5
Update on Implementation of the Principle Review of Principle New or Enhanced Principle
viii. Consideration will be given to proposals to fully implement the
use of participatory budgeting
Full implementation of Participatory Budgeting  and delivery of the 1%
target has been delivered to March 2024.
There should be a shift in emphasis from focussing
only on participatory budgeting to incorporate the
requirement for community engagement /
communication to reflect statutory requirements
under the Community Empowerment (Scotland) Act
2015, which requires councils to embed community
participation in the design and delivery of public
services, and to build community capacity to give
people the skills and confidence required to be
involved, while recognising the particular needs of
communities facing multiple social and economic
challenges.  The outcome of such engagement will
inform members’ decisions around the solutions to
ensure the Council meets its statutory requirement
to set a balanced budget.฀
Consideration will be given to proposals to
fully implement the use of participatory
budgeting and opportunities to meet statutory
requirements under the Community
Empowerment (Scotland) Act 2015; the outcome
of such considerations is will inform members’
decisions around the solutions to ensure the Council
meets its statutory requirement to set a balanced
budget.฀
ix. Active member involvement is essential. The Accounts
Commission previously recognised that “with the financial
pressures, Councillors need to make difficult decisions. This
requires effective political leadership and communications. It
is essential that all Councillors, not just the administration,
work effectively with officers and other stakeholders to identify
and deliver necessary savings.”
Officers continue to develop a budget strategy and ensure that
members are fully informed and supported as they work towards
setting a balanced budget. The Financial Planning Advisory Group
was established in 2023/24 to encourage cross party working and to
strengthen the budget process. This proved challenging and the group
has subsequently been disbanded.  However, all member budget
briefing sessions were delivered to encouraging  active member
involvement across all political groups. Subsequent identical briefings
were also provided to Trade Unions.  These briefings were well
received and Finance continued to work with individual party budget
groups to progress budget discussions and to support members with
their group budget motions.
This principle remains essential to the Revenue
Budget Strategy. Minor change to reflect
requirement to involve other key stakeholders.
Members and other key stakeholders will be
actively involved in the budget process; with the
financial pressures facing the Council, Councillors
need to make difficult decisions. To manage these
challenges requires effective political leadership and
communications. It is essential that all Councillors,
not just the administration, work effectively with
officers and other stakeholders to identify and
deliver necessary savings and meet their statutory
responsibility to set a balanced budget.  In addition, it
is important to involve other key stakeholders as
deemed appropriate.
Key Principles
Revenue Resources Budget Strategy Progress Update & Review of Key Principles
Page 44 of 166

Page 45

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    PH/AL Date 06/06/24 
Open Space Strategy Update 
From  Pamela Humphries, Chief Officer (Place)  
E-mail LeslieA@northlan.gov.uk Telephone Alan Leslie
07583 133230 
Executive Summary
The Planning (Scotland) Act 2019 introduced new statutory duties upon councils to prepare
and publish an Open Space Strategy (OSS) and Play Sufficiency Assessment (PSA) to
assess the sufficiency of play opportunities for children in their area.   
An open space strategy must contain an audit of existing open space provision and an
assessment of current and future requirements. The Act also introduces a requirement for
planning authorities to carry out a play sufficiency assessment. 
Work is underway on the development of the council’s OSS which will set out a strategic
framework for the future development, maintenance, and use of open spaces and green
networks. 
This report provides an update on the progress of the Open Space Strategy (OSS) and of
the Open Space Audit carried out to inform it. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
1) Acknowledges the completion of the Open Space Audit as a major step towards
publication of a Draft Open Space Strategy and Play Sufficiency Assessment later
this year.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (15) Encourage the health and wellbeing of people through a range
of social, cultural, and leisure activities 
(16) Transform our natural environment to support wellbeing and
inward investment and enhance it for current and future
generations 
(17) Ensure we keep our environment clean, safe, and attractive 
(20) Improve the involvement of communities in the decisions, and
development of services and supports, that affect them
Item 5
Page 45 of 166

Page 46

1. Background 
1.1 As reported to Committee in March 2023, the Planning (Scotland) Act 2019 placed a
new duty on planning authorities to publish an Open Space Strategy (OSS), supported
by an audit of open spaces in their areas, and to assess the sufficiency of play
opportunities for children and young people. Planning Authorities must have an
approved Open Space Strategy and have carried out Play Sufficiency Assessments
(PSAs) prior to publishing the Evidence Report as part of the preparation of the next
generation of Local Development Plans. 
1.2 The Scottish Government published its finalised Play Sufficiency Assessment
Regulations 2023 in December 2023. Proposed requirements for Open Space
Strategies remains in draft form as part of the Draft Open Space and Play Sufficiency
Assessment Regulations 2021. 
1.3 The Draft Regulations define open space as “space within and on the edge of
settlements comprising green space or civic areas such as squares, marketplaces and
other paved or hard landscaped areas with a civic function.” 
1.4 It is intended that the Open Space Strategy will also incorporate the Community Sports
Pitch Review currently being prepared by the Council. 
1.5 In order to progress the development of the Open Space Strategy an Open Space
Strategy and Play Sufficiency Assessment Steering Group has been established,
including representatives from relevant services and external partners (e.g., public
health colleagues at NHS Lanarkshire). 
1.6 Members will recall that a small project team was established to deliver the audit and
strategy development phase of the Open Space Strategy and Play Sufficiency
Assessment. This work has been supported by Greenspace Scotland, a social
enterprise which is the national lead for improving urban environments and which has
significant experience in developing assessments and strategies of this nature. 
2. Report 
2.1 The audit of all open spaces in North Lanarkshire of 0.2 hectares or greater has been
completed by the project team, in conjunction with Greenspace Scotland and Glasgow
& Clyde Valley Green Network. Smaller spaces were included where considered
appropriate, such as where a smaller space is recognised as being of particular value
to the community or makes a significant contribution to particular outcomes. 
2.2  The pioneering NLC Open Space Strategy Quality Assessment Document developed
in collaboration with Greenspace Scotland and the Glasgow Clyde Valley Green
Network ensured a robust and consistent approach to auditing that could be applied to
every site. This looked at the quality of green and open spaces under the following
headings: 
(24) Review and design services around people, communities, and
shared resources 
(25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work All Programmes of Work
Page 46 of 166

Page 47

• Accessible and connected
• Place quality
• Care and maintenance 
• Function, use and activity
• Safe
• Biodiverse supporting ecological networks 
2.3 722 sites were identified initially as requiring to be audited. A further desktop exercise
was undertaken, along with analysis of the results of the surveys. This identified a
further 829 sites to be included, taking the total number of sites that fell to be audited
to 1,551, totalling 5,646.7 Hectares, representing over 12% of North Lanarkshire’s total
land area of 466.2 km2/46,620 Ha. The audit phase has been completed and final
checks are being made to the data to ensure that it is consistent. 
2.4 Analysis of the open space audit findings is still ongoing, but Members may be
interested in the initial high-level, Council-wide findings to date. 
• 1,551 sites fell to be audited in line with the Scottish Government’s definition,
covering a total of 5,647 hectares. Due to site and time constraints, the audit
team was able to survey 4,256 hectares in-person, representing 75% of all land
due to be surveyed. All other sites will be scored using a sampling process
based on similarities in type and location of sites that were audited in-person. 
• North Lanarkshire has 16.55 Ha of open space per 1,000 people overall.  This
equates to over 350 m2 per home. 
• North Lanarkshire has 293 sports pitches, not counting 71 red blaes pitches. 
2.5 Having carried out and reported on our initial partner engagement workshop in 2022 a
programme of engagement and consultation was undertaken throughout 2023 to
further inform the audit of sites and the development of the Open Space Strategy. 
2.6 Two major open/public survey exercises for Green & Open Space and Play were
carried out in the spring and summer of 2023. Both exercises involved surveys of those
using the spaces, as well as any parents and carers of open space/play users. Digital
technology and interactive smart maps were developed to compliment traditional
engagement methods and enable feedback about the existing quality and level of
provision of open space to be gathered in real time, therefore more effectively and
efficiently. The response was encouragingly large and clearly captured the attention
and interest of a significant cross-section of our communities across North Lanarkshire. 
2.7 1,185 people responded to the Green and Open Space Survey. Analysis of the
responses was carried out, with the following being the significant findings: 
• A total of 465 spaces were identified as being important to our communities
(Included in Open Space Survey Phase 2) 
• 88% of participants visited open space once a week or more 
• 74% of participants had a 10-minute walk or less to their nearest green or open
space. The majority (53%) could walk to their nearest green or open space within
5 minutes 
Page 47 of 166

Page 48

• 90% of participants strongly agreed with the statement ‘Visiting green spaces
makes me feel better’ 
• 54% of participants were very satisfied or quite satisfied with the quality of their
local greenspace. 13.92% were neither satisfied nor dissatisfied 
• 70% of participants responded ‘yes’ or ‘maybe’ that they would be interested in
volunteering in future 
• The main factors that would influence if people used green and open space more
or less often were:
o Litter
o Anti social behaviour or vandalism
o Maintained paths for walking, wheeling and cycling 
2.8 1,663 responses were received to the survey of peoples’ perception of play space.
Analysis of the responses to this survey highlighted that: 
• 74% of participants were responsible for children on the 5-11 age category. 
• 43% said their child(ren) go outside to play or hang out with friends several times a
week. 
• 72% of participants said their child(ren) get to where they play by walking, wheeling,
cycling, scooting, skateboarding or blading. 
• 71% had a 10 minute walk or less to where their child(ren) play. 
• 44% of participants were either quite dissatisfied or very dissatisfied that their
child(ren) have access to outdoor play outside of school hours. The most popular
response was quite satisfied (26.88%). 
• 72.5% of participants agreed strongly or agreed slightly that their local play space
was easy to get to by walking or cycling 
• The main issues highlighted when asked what participants didn’t like about their
child(ren)’s play space were: 
o Litter  
o Dog poo in the play space 
o Equipment that is broken or has missing parts 
o Dangerous litter, for example glass or needles 
2.9 A joint session was held with all 9 of North Lanarkshire’s Community Boards in summer
2023, with similar themes emerging as from the Partner Worshop and Surveys, namely:
Biodiversity; safety; maintenance; accessibility; multi-functionality; inclusivity, including
toilets and welcoming for children to play. 
2.10 A further workshop involving the Council’s internal and external delivery partners took
place at the GLO Centre, Motherwell, in November 2023. Taking into account the
outputs from previous workshops, the public consultation and the audit to that date,
delegates were tasked with identifying the key drivers that would influence the contents
of the Open Space Strategy. It was important that the delegates also identified potential
Page 48 of 166

Page 49

barriers that could restrict both the contents of the Strategy and, crucially, its effective
implementation.   
2.11  The following Drivers emerged through the various engagement exercises undertaken
by the project team:- 
• Budget. The Open Space Strategy will need to take account of likely available
resources and it is recognised that there will be a need to use the OSS as a
framework to help prioritise available resources and/or support alternative options
to help maintain/improve or re-purpose some areas of open space.  
• Health. The direct health benefits to communities and individuals is another
obvious driver, from individual physical and mental wellbeing to reductions in the
burdens and strains placed on health care provision through increased personal
wellbeing.
• Environment & Climate. Open spaces contribute much needed green lungs within
our predominantly and tightly packed urban communities. They give an opportunity
for wildlife to flourish and enhance the ecosystems around us. They also have
benefits in restricting and regulating the chemical factors that are contributing to
climate change.
• Community Involvement. Community engagement is a central part of the process
to develop an OSS, in line with the council’s Delivering for Communities operating
model. 
2.12  Analysis of the significant amount of data gathered is ongoing. Consideration is being
given as to how to present the data and to ensure appropriate standards are adopted
and a subsequent grading system is applied as part of the Strategy. 
2.13     As we prepare our Open Space Strategy, engagement will continue to be a central part
of the process. To ensure partners, stakeholders and communities are involved it is
proposed to seek views on the draft strategy during a 12-week period of consultation
in Autumn 2024. There will be an elected member workshop held in advance of the
public consultation period.  It is currently anticipated that the final Open Space Strategy
will be presented to Committee for approval in Cycle 1 2025.   
3. Measures of success 
3.1 Open Space Audit completed and Open Space Strategy on track to meet statutory
requirements and can demonstrate meaningful stakeholder engagement, and provides
an effective framework to inform future planning and investment decisions for the future
provision and management of open space making best use of available resources.     
4. Supporting documentation 
4.1 No supporting documents. 
Pamela Humphries
Chief Officer (Place) 
Page 49 of 166

Page 50

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
An equality impact assessment will be carried out as part of the development of the
OSS.   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Financial provision has been made to support the delivery of the Open Space Audit
and Open Space Strategy.  The Open Space Strategy and the associated Action
Plan will need to reflect the financial constraints under which the council operates,
and consider how to make best use of available resources.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 50 of 166

Page 51

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
There has been close collaboration with the Business and Digital Team to progress
the IT requirements for the OSA.  The council’s existing ‘Confirm’ asset
management system is being utilised for OSS audit use. A module within the
system was designed and developed at pace to meet the needs of the audit. 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The Open Space Strategy will have a positive impact on the environment through
the establishment of standards relating to the retention and enhancement of open
spaces and the consequent benefits to health and biodiversity. It will also contribute
towards climate change adaptation and mitigation and have a positive impact on
North Lanarkshire’s carbon footprint. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐
Page 51 of 166

Page 52

If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC).
A Children’s Rights and Wellbeing Impact Assessment will be carried out as part of
the development of the OSS.   
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 52 of 166

Page 53

North Lanarkshire Council
Report
Policy & Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    SP Date 06/06/24 
Community Use of Council Assets 
From  Stephen Penman, Chief Officer, Strategic Communication and Engagement  
E-mail PenmanSte@northlan.gov.uk Telephone 07947 997750 
Executive Summary 
This report presents for consideration of the committee a new Community Ownership and
Management of Council-Owned Assets policy and associated developments to assist in
the better use of assets by community groups, whether through formal Community Asset
Transfer or other mechanism. 
It follows a review determined by the Council at its budget-setting meeting in February
2024, and builds on previous work undertaken in promoting community use of assets. 
The policy brings together all elements of community use in a single place, sets out the
requirements for groups, the council and other stakeholders and describes a framework
for consideration of leases with respect to council assets. 
In addition, this report proposes two significant developments which it is anticipated will
accelerate the process, lead to more timely conclusion of asset transfers, and assist groups
in carrying out capital works to assets upon a successful transfer. 
Firstly, the role of community capacity officer will be created to provide intensive support
to community groups in realising their ambitions to undertake a Community Asset Transfer
or any other arrangement involving use of assets. 
Secondly, following the decisions of the Council earlier in 2024 to allocate £10m of capital
to the local development programme and the review of Community Asset Transfer, a bid-
in capital fund with an initial value of £3m to 2028 will be established for groups to fund
capital works to assets which are transferring.   
Recommendations
It is recommended that the Policy & Strategy Committee: 
1) Approve the Community Ownership and Management of Council-Owned Assets
policy at Appendix 1.
2) Acknowledge the creation of a capital fund to support groups in carrying out works
to transferring assets in line with previous council decisions.
Item 6
Page 53 of 166

Page 54

1. Background 
1.1. The Plan for North Lanarkshire has as priorities that the council will enhance
participation, capacity and improvement across communities and improve the North
Lanarkshire’s resource base. The council has a long history of working effectively with
local communities and recognises the important contribution that this makes to
improving outcomes for residents. The council welcomes community interests and
requests to use assets. 
The Community Empowerment (Scotland) Act 2015 provides the legal framework for
Community Asset Transfer (CAT). The primary purpose of CAT is to empower local
communities by giving them control over assets owned or leased by public bodies,
including councils, that can be used to address local need, promote community
development and enhance wellbeing. 
1.2 CAT is a formal process, with groups requiring to submit a request outlining their plans
for the asset’s use and demonstrating community support. The public body then
assesses the request based on criteria such as community benefit, sustainability, the
viability of the business plan and, in the council’s case, links to the priorities contained
within the Plan for North Lanarkshire and the outcomes in local outcome improvement
plans. However, other mechanisms for groups to assume leases are possible. 
1.3 Prior to the legislation taking effect, the council operated a pilot scheme for community
asset transfer, with one project being successfully completed. Since the legislation took
effect, there have been six full transfers under the CAT process, 16 leases agreed and
10 other mechanisms, meaning that, since 2017, a total of 32 assets have been
effectively transferred to communities. For the purposes of this report, all transfers
under these categories are referred to as CAT whether through the formal process or
not. 
1.4 The Community Partnership team are in active discussions with 38 groups (some in
connection with the same assets), with those groups at varying stages of readiness to
undertake further transfers.   
2. Report 
2.1 While progress has been made in community asset transfer over recent years, and
ongoing and active discussions are being held with a large number of groups, it is
considered that significant potential exists to increase the number of Community Asset
Transfers.
3) Note the creation of a dedicated resource to provide groups with intensive support
to realise their ambitions for use of assets.  
The Plan for North Lanarkshire
Priority  Enhance participation, capacity, and empowerment across our
communities
Ambition statement (19) Improve engagement with communities and develop their
capacity to help themselves
Programme of Work One Service
Page 54 of 166

Page 55

2.2 To facilitate faster progress, a Community Ownership and Management of Council-
Owned Assets policy has been developed. This updates (and supersedes) the existing
Community Asset Transfer policy and introduces a number of new elements. 
Capacity 
2.3 The most significant challenge to completing asset transfers to community groups is
the capacity of groups themselves to develop all the elements required for a successful
transfer and, in many cases, organise under the types of governance required to be
eligible. 
2.4 With respect to governance, groups require to be a Community Controlled Body (CCB),
of which there are different types. A CCB must be a constituted group (with appropriate
articles of association), a Scottish Charitable Incorporated Organisation (SCIO) or a
registered charity. In order to be considered as a CCB, the operation, governance and
practice of the group must reflect: 
- that the group is controlled and managed by community members and ensure
that membership is open to any adult who wishes to join;
- an asset clause stating that any profits can only be used to benefit that
community and in accordance with the aims and objectives of organisation as
set out in their constitution or incorporation documents;
- that if the request is for transfer of title (i.e. ownership rather than lease) the
CCB needs to be a not-for-profit organisation;
- that there must be a clear dissolution clause that states that the assets of the
CCB can only go to another CCB or charity. 
Some bodies are not automatically eligible for CAT unless designated to be so by the
Scottish Ministers, for example Community Interest Companies, Community Trusts,
Foundations or enterprising community and voluntary organisations. However, the
council will seek to work with such organisations where appropriate outwith the formal
CAT process. 
2.5 Companies or other organisations established for profit, for the benefit of private
shareholders, for the purpose of party political promotion, or for the generation of equity
are not eligible for CAT. 
2.6 With respect to the capacity of groups, the following elements must be in place before
a CAT can be considered:
- an established business plan
- a demonstration that the transfer will benefit the community in a sustainable way
- measures to ensure equality of access and benefit
- demonstrable links to The Plan for North Lanarkshire and Local Outcome
Improvement Plans. 
2.7 Because the assets in questions are in public ownership (or, on occasion, leased)
these requirements are necessary both in legislative terms and to ensure that transfers
are in line with council priorities. However all these elements can be challenging for
groups to meet. For many groups, the first step is to become a CCB which, of itself,
involves substantial consideration and group member time, particularly as group
members are volunteers in the overwhelming majority of cases. 
Page 55 of 166

Page 56

2.8 All of this combined has the effect of extending the timescale from initial enquiry to
formal application. In some cases, more than two years has passed since the initial
enquiry with some groups still not at the stage of being able to submit a formal request. 
2.9 This also brings resource challenges for the council; assisting groups in building their
capacity requires intensive support with a wide range of knowledge about the
legislation, how groups commonly operate, the availability of external support and
grants, local priorities and good governance. 
2.10 In order to intensify efforts to effect CAT, and to ensure that groups can have the
confidence and expertise to proceed through what can be an onerous process, it is
considered appropriate to create a dedicated resource of community capacity officer
(2FTE). This role will provide the intensive support needed to groups through a deep
understanding of the issues faced, governance and advice. It will provide a single point
of contact for groups, and will advise on sources of external funding available while
making the necessary connections across the council. This can include with officers in
legal, property and, for example, Business Gateway, who can provide advice on
business planning. 
2.11 This knowledge, ability to connect necessary expertise, and intense focus will have the
benefit of increasing groups’ capacity at pace and giving them better opportunities to
conclude CAT in a timely way. 
2.12 It is acknowledged that faster progress towards CAT completions may add resource
pressure to other council services. This will be closely monitored and considered jointly
by the relevant chief officers as progress is made. 
Community Asset Fund 
2.13 While the council has often carried out minor works to assist in preparing an asset for
transfer and making a transfer more feasible, it is recognised that CCBs may wish to
undertake other capital works to assets to upgrade them or to otherwise make them
more appropriate for the activities to be undertaken by the group. 
2.14 The council recognises that CCBs may be financially constrained and find it
challenging to raise capital money at pace. This, in turn, can cast doubt on a group’s
ability to take on ownership or management of an asset and can lead to longer
timescales before a group is ready to concluded a CAT. 
2.15 As part of its strategic capital investment plan, approved in March this year, the council
allocated £10m in total for the next five years to facilitate both the continued delivery
of the Local Development Programme and to help conclude further CAT applications. 
2.16 It is proposed to create a £3m Community Asset Fund (which includes £670,000 of UK
Shared Prosperity Fund grant). The fund will allow CCBs to bid for capital monies to
carry out works to an asset subject to a successful CAT being concluded (whether full
ownership or lease). This will give CCBs the capacity to carry out works which meet
the ambitions set out in their applications and will allow them to plan such works with
some certainty. 
2.17 CCBs will be able to apply for a capital grant of up to £100,000 on successful
acceptance of their stage 2 CAT request, and should indicate clearly in the course of
their application what their bid is for and whether their CAT request is contingent on a
successful bid into the Community Asset Fund. The £100,000 upper limit will be subject
to review to ensure it best meets the needs of bidders.
Page 56 of 166

Page 57

2.18 Should a bid be approved, the capital allocation will be released to the CCB on the
date of transfer and is expected to be spent within 24 months. The detail of the
proposed expenditure must be approved by the council and only the activities approved
can be undertaken. 
2.19 Other conditions aimed at protecting the public interest and securing Best Value must
be agreed by the CCB before any monies can be released, for example:
- audit and management of bids and expenditure
- open and transparent procurement
- an impact assessment covering equality, environment and community benefit
specific to the activity to be funded by the capital grant 
2.20 A detailed set of conditions will be developed quickly to ensure bids can be supported
in early course, along with technical guidance for council officers. 
Discounted arrangements 
2.21 Scottish Government guidance for public bodies with respect to the Community
Empowerment (Scotland) Act 2015 discusses at length the issue of discounting from
market value for both full transfers and leases. The guidance recognises that, while
public bodies have a duty to Best Value, this does not always mean that Best Value is
guaranteed by securing the highest possible price or disposal of an asset. As set out
by the Disposal of Land by Local Authorities (Scotland) Regulation 2010, it is a
question of balancing the financial and non-financial benefits and risks of different
options. 
2.22 CCBs making an application for CAT must, according the provisions of the legislation,
state how much they are willing to pay for an asset or what level of rent they are willing
to agree to (in effect requesting a discount from market value), and the council has a
duty to consider this. As set out in the Scottish Government guidance, CCBs should
not assume that a transfer will be available at a nominal sum. 
2.23 The new Community Ownership and Management of Council-Owned Assets policy
provides a framework for consideration of a discounted rate based on assessment of
the overall strength of the application. However, this is not the only factor to be
considered; the council must balance whether the asset is currently in use, to what
level, the cost of relocation of other activities and other factors. The Community Asset
Ownership and Management Leadership Group will consider all of these factors before
making a decision or a recommendation to committee. 
Assets surplus to the council’s requirements 
2.24 The council has a procedure for the disposal of surplus assets in place. Where one
service declares an asset surplus to its requirements, an internal check is carried out
with other services to determine if they have a use for the asset in question before
disposal. It is proposed that, where no service expresses an interest in a surplus asset
and the asset is considered suitable for potential transfer, a 12-week period will be built
in to allow the community partnership team to discuss potential asset transfer with local
groups. If no concrete interest is expressed during this period then disposal will
proceed in the normal way. 
Next steps 
Page 57 of 166

Page 58

2.25 Recruitment of community capacity officers to carry out the intensive capacity-building
work described in this report. 
2.26 Rapid development of detailed guidance and conditions for the Community Asset Fund
and technical guidance concerning policy application for officers. This will be
developed by a group of officers including the Chief Officers for Asset & Procurement,
Legal & Democratic, Financial Solutions, and Strategic Communication &
Engagement. 
2.27 Promotion of the Community Asset Fund, both to groups engaged in current dialogue
about CAT and to the wider community and voluntary sector. 
2.28 Work in partnership with Business Gateway to deliver business planning, cash flow
forecasting and other workshops. 
3. Measures of success 
3.1 More CAT completions, with appropriate bids into the Community Asset Fund. 
4. Supporting documentation 
Appendix 1- Community Ownership and Management of Council-Owned Assets Policy. 
Stephen Penman
Chief Officer, Strategic Communications and Engagement 
Page 58 of 166

Page 59

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The implementation of the policy aims to reduce the inequalities caused by socio
economic disadvantage align with the requirements of the Fairer Scotland Duty. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Existing resource identified to create new posts; capital funding profiled
appropriately. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Job evaluation required for creation of two new posts. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Detailed terms and conditions for asset fund to be developed. 
Page 59 of 166

Page 60

5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Increased need to raise awareness among groups about additional support
available to them. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
• Risk in transfer of capital will be managed through project management
and conditions of grant. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒   
Page 60 of 166

Page 61

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒   
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 61 of 166

Page 62

APPENDIX 1
Community
Ownership and
Management of
Council-Owned
Assets
Strategic Communication and Engagement  
Page 62 of 166

Page 63

Document control
Title Community Ownership and Management of Council Owned Assets Policy
Owner Stephen Penman Contact penmanste@northlan.gov.uk
Governance Group Communities Committee
Author Leanne Pollock Contact PollockL@northlan.gov.uk 
Revision History
Number Originator Date Review Commenced Revision description/record of change
V1.0 Leanne Pollock 1.3.24 Creation
V2.0 Stephen Penman 19.5.24 Various revisions to encompass further
discussions     
Document Approvals
Number Governance
Group
Date approval granted Date approval to be requested 
(if document still draft)
2.0 Relevant CMT
members
23.5.24 
Consultation Record (for most recent update)
Status of document consulted upon DRAFT
Stakeholders consulted/date Chief Executive (19.5.24), relevant chief officers (19.5.24) 
Strategic Alignment
Aligns to The Plan for North Lanarkshire (ambition statement 19) 
Next review date
Review Date June 2028
Page 63 of 166

Page 64

Community Ownership and Management of
Council Owned Assets Policy
Policy statement 
North Lanarkshire Council recognises the value and contribution that the community and voluntary
sector makes in supporting the ambitions of The Plan for North Lanarkshire. The council is
committed to working in partnership with the sector to continue to provide key services to local
communities and to continue to create thriving places where everyone can play a full and active part
in promoting healthy lifestyles and building strong communities.
Buildings, spaces, and assets are important in providing a solid base from which the sector can
deliver their activities. There is commitment to providing opportunities to support responsible
community ownership and management approaches in a way that meets the needs of different
types of community organisations while minimising and managing any risk to both individual
organisations and the council. 
Understanding the role of key stakeholders will be instrumental in ensuring the successful
implementation of this policy.
Community and Voluntary Sector organisations with a desire to take on ownership or management
of a council owned asset should familiarise themselves with the policy and process and work with
council officers to understand what they need to do to be in a position to take forward their
aspirations. When submitting a request, the organisation has a responsibility to ensure that their
proposal meets the criteria to be considered and includes all relevant information as well as
evidence of community engagement.
Elected Members should understand and promote adherence to this policy and associated
processes, signpost community organisations to available/advice online and from appropriate
officers. Elected members also have a role in the decision-making process through the committee
structure and may be called upon to be involved in political reviews reflecting the requirements of
the Community Empowerment (Scotland) Act 2015. 
Council Officers from key services have a role in working together to ensure the effective
implementation of this policy. They should consistently apply this policy and associated approaches
to work positively with local community organisations and other council services to achieve the best
possible outcome in any given situation for both the council and the community organisation.
Officers have a role in providing guidance, advice and signposting related to the policy and process
relevant to their area of business. Officers will be involved in assessment of requests, presenting to
senior leadership outcome of assessments and making recommendations to committee as well as
supporting the appeals process linked to the Community Empowerment (Scotland) Act 2015.
Chief Officers have a role in considering the outcome of any assessment of applications, agreeing
the route to decision, and making recommendations to committee as required. Chief Officers have a
role in working with officers to consider more challenging or complex requests, identifying
leadership action required with a view to finding a mutually beneficial solution. 
Page 64 of 166

Page 65

1. Policy objectives 
• Ensure maximum community benefit is derived from council-owned assets
• Strengthen participation and engagement in community and recreational activities and
help communities to understand the options available to them for use, ownership and
management of council owned assets
• Safeguard council owned assets where it can be demonstrated that the business case
and community benefit associated with retention is greater than the proposed
alternative 
• Ensure requests for ownership, lease or management of council-owned assets, including
any discounted rates or prices, are managed consistently and fairly through a
transparent assessment process. 
2. Guiding Principles
The following set of principles will govern the council’s response when considering requests for
community ownership or management of council owned assets:
• The belief that community organisations can play a key role in supporting and sustaining
local communities.
• The council is bound by legislation to obtain best consideration for its assets, but can
dispose of them at less than market value when certain considerations apply, e.g.
demonstrable community benefit. Such consideration will form part of the assessment
process.
• Recognising property assets as a resource to be used in the delivery of services and to
support the delivery of the Plan for North Lanarkshire, including where a transfer would
assist the council in the effective management of its revenue budget.
• Commitment to positive, supportive engagement and a collaborative relationship with
community groups in the management of assets.
• Valuing the community benefit derived from the activities undertaken by community
organisations and taking this fully into account in setting fair management, lease or
transfer terms.
• Encouraging groups to work together and share efforts and resources for effective use of
an asset for the benefits of the wider community.
• Ensuring consistent application of the processes associated with the terms and conditions
of any lease agreements and property transactions with community and voluntary sector
organisations.
• Ensuring the adoption of a flexible approach when responding to changing community
circumstances, the diversity of the sector and ensuring a focus on the aspiration and
outcomes of a specific community and /or organisations.
• Ensuring no additional cost to community organisations for the administration of
community ownership and management processes, for example in the preparation of
leases and rent reviews. 
3. Scope of the policy 
Community Ownership and Management of Assets refers to the processes, policies and associated
procedures the council may use to transfer the ownership, lease, full or partial management of an
asset to a community body. This may reflect, for example, opportunities arising from:
Page 65 of 166

Page 66

• Community Asset Transfer Requests (CAT) guidance and associated procedures linked to
part 5 of the Community Empowerment (Scotland) Act 2015
• Participation Request guidance associated with the Community Empowerment (Scotland)
Act 2015
• Asset Management in support of the Plan for North Lanarkshire and associated
Programme of Work, or other council policies and plans
• Dialogue with communities to progress community led priorities identified through local
engagement activity, community boards, and their Local Outcome Improvement Plans. 
In scope: 
Requests from community-based organisations who meet the necessary conditions where their aims
are charitable, not for profit and for the benefit of the wider community including: 
• New management agreements for an existing council facility or land
• Leases (including maintenance of the property/land in accordance with lease terms and
conditions)
• Full transfer of ownership
• Participation requests that may impact on property related decision or business.
• Requests for community organisations to use and/or take on maintenance of a council
asset or part of it. 
Not in scope for application of this policy are:
• NLP mortgaged properties 
• Requests from community groups or organisations who cannot demonstrate capacity,
resource or community support proportionate to their proposal
• Common good assets
• Sites that the council has a legally committed or committee approved business decision
to demolish or otherwise dispose of (reflected in longer term visions or strategies would
not prevent a CAT
• Certain types of businesses or Community Interest Companies (CIC)
• Any other agreements for the purposes of commercial gain 
• Unincorporated organisations where their structure does not allow them to enter into
contracts or legal agreements. 
4. Application of the policy 
This policy applies to all council services and officers receiving requests or expressions of interest
from communities related to community ownership or management of council owned assets. The
policy can also be used to guide proactive approaches to engaging with communities around
opportunities for community ownership and management where the council plans to disinvest, or
has disinvested, in certain assets.   
This policy applies to voluntary groups, registered charities, clubs, uniformed community groups and
other community-based organisations where their structure and governance allows. For certain
community organisations the Community Asset Transfer legislation does not apply. In these cases the
council can make an assessment regarding a reduced lease cost, but this should be for a limited
period (1-3 years) and at a reducing rate with the expectation that social enterprises aim to become
self-financing. 
Page 66 of 166

Page 67

This policy does not apply to commercial leases including professional sports clubs (i.e. those clubs
who pay athletes to play as their primary occupation). Where there are exceptional circumstances
which require a variation from the policy, consent will be required to be obtained from the
Community Asset Ownership and Management Leadership Group. 
The policy meets the requirements of the Community Empowerment (Scotland) Act 2015 relating to
Community Assets Transfers and Participation Requests and aims to use these processes to achieve
outcomes agreed with community groups and organisations based on their aspirations and the
council’s ambitions. The policy covers one clear approach to:
• Community Asset Transfer 
• Community and voluntary sector leases
• Other outcomes for community use, management or ownership of council assets agreed
through the Participation Request process. 
The council has the discretion to engage with groups to reach a mutually agreeable solution and each
case will be considered on its own merits using a standard set of criteria. This means that a
consistent and fair approach will be applied to all requests and the outcome must balance and reflect
the needs of the wider community, the aspirations of the applicant organisation and the interests of
the council. 
5. Approach to Community Ownership and Management of
Assets – overview
The council fully supports the underpinning principles of community empowerment and community
ownership and will support communities to meet their aspirations though application of a clear
policy and process. 
The council has created a single application and assessment process for all requests from community
and voluntary sector organisations.
There may be times when, to protect the interests of the wider community, assets may need to
remain in council ownership to support the delivery of essential services or support economic activity
in the area. Where this is the case efforts will be made to identify alternative solutions and
outcomes. Each case will be fully considered on its merits reflecting the guidance associated with
parts 3 and 5 of the Community Empowerment (Scotland) Act 2015 and outlined at appendix 1. 
The flowchart at Appendix 2 summarises the council approach and an overview is provided as
follows.
Stage 1: Expressions of interest  
The council has identified contact officers for community ownership and management enquiries to
provide guidance to community groups, and to help them to assess their eligibility and capacity to
take on an asset in a way that is suited to their needs. In the first instance community groups are
asked to: 
• Familiarise themselves with the council’s community ownership and management
process and eligibility criteria through the council’s information page here 
Page 67 of 166

Page 68

• Make initial contact by emailing expressions of interest on enquiries to community
ownership@northlan.gov.uk 
Following initial engagement, organisations will be supported to understand the process and what is
required of them. This discussion will involve checking with the organisation that they meet the
criteria to apply to take on ownership or management of an asset and are able to enter into an
agreement with the council under the council’s process. 
Prior to submitting an official request, eligible organisations will be encouraged to identify that they
can evidence that the purposes for which they intend to use the asset they are requesting is for
community benefit.
Where it is evident that the group does not meet eligibility criteria, council officers will work with the
group to identify capacity issues and support with capacity building and, where appropriate, signpost
the group to additional support or information to assist them to meet their aspirations in the future.
Stage 2 - Submitting a request 
In the interest of fairness and clarity, for all applications relating to community ownership and
management of assets the council will apply assessment criteria and timescales (where possible) that
reflect the requirements of the Community Empowerment Act. 
For organisations that do not meet the Scottish Government criteria as an eligible body under the
Community Empowerment Act but can still demonstrate community benefit (for example
Community Interest Companies (CICS), Community Trusts, Foundations or social enterprises in
certain circumstances) the council can accept an application. However, in this case the outcome of
assessment and decision of the council is final and unless designated by Scottish Ministers the
council is under no obligation to review or honour any requests to appeal the decision. 
All community ownership or management requests must be submitted using the council’s application
form attached at appendix 3. 
6. Types of community groups and eligibility criteria 
In order to be considered for any type of community ownership, management or lease of an asset
the operation, governance and practice of the applicant must show: 
• That the group is controlled and managed by community members and ensure that
membership is open to any adult who wishes to join
• That they have an asset clause stating that any profits can only be used to benefit that
community and in accordance with the aims and objectives of the organisation (as set
out in their constitution or incorporation documents)
• If the request is for transfer of title (i.e. ownership) the CCB needs to be a not for profit
organisation 
• a clear dissolution clause that states that the assets of the company can only be
transferred to another properly constituted community group or charity.   
7. Types of request 
Page 68 of 166

Page 69

Full Ownership Requests 
Where a group is applying to take full ownership of a building or asset more detailed supplementary
information should be submitted including but not exclusive to:
• A robust business plan 
• Any feasibility or condition studies that have been undertaken by the group 
• Any valuation information instructed by the group, which must be from a suitably
qualified and experienced member of the Royal Institution of Chartered Surveyors who is
also a Registered Valuer. Any valuation will be subject to agreement with the council in
line with Scottish Government guidance on Community Asset Transfer.
• A project plan and financial projections for any capital and projects management works
required to ensure the building can be made operational (if not already).  This would
typically include a costed building survey.
Leases 
The council can agree to lease assets (normally land or buildings) at a reduced lease value to
voluntary groups, clubs and other community-based organisations. This approach reflects the
principles of The Plan for North Lanarkshire and the Community Empowerment (Scotland) Act 2015
but also enables the council to agree arrangements with groups who do not fully meet the legislative
criteria for community asset transfer or where it is mutually beneficial to the council and the wider
community to conclude a lease at pace. The merits of an application for a discounted lease will be
assessed using the same criteria as for requests for full ownership. The following points apply to
community and discounted leases:
1. The cost of the lease will be assessed via the information submitted as part of the
application process. Discounts will be considered at the discretion of the council as reflected
in the discount matrix at appendix 5. The lease would reflect the market value with any
percentage subsidy or the standard value applied based on assessment process and reflected
in a back letter. 
2. Leases will be developed on the basis of the tenant assuming full repairing and insuring
leases (FRI).
3. At either the point of rent review or lease renewal there will be a re-assessment to
determine the appropriate lease subsidy.
4. Standard values will be reviewed in line with inflation at policy review points.
5. The maximum duration for the granting of a lease is 25 years.
6. Discount will not be awarded at 100% (rent is an essential component of a lease and rental
of £1 would be required as a minimum).
7. In the case of a long lease, for example 20 years or longer, where a community group is
required to register their lease, there will be outlays to both parties. Where there is an actual
external cost to the council, e.g. a district valuation fee, property enquiry certificate, Legal
and Plans Reports, this will be met 50% by the council and 50% by the tenant. 
Page 69 of 166

Page 70

8. Existing tenants under the policy applying for an assignation to another community body
(or require assigning due to restructuring, for example to a SCIO) or for a licence for works
will only be charged for any actual external costs incurred by the council.
Participation Requests for alternative outcomes  
Participation requests are much broader than taking on an asset and can cover a number of ways
that community groups want to become more involved in decision making and delivery of council
services. Participation requests can be a useful tool in helping groups to identify their aspirations and
the outcome they want to achieve. Participation requests can assist the council to work with groups
who do not clearly fit the criteria for ownership or who do not want to officially take on an asset at
this time but may want to become more involved in supporting the councils ambitions through, for
example: 
• Maintenance of an asset or greenspace 
• Using a piece of council-owned land to deliver community activities (events,
celebrations, fitness and environmental activities)
• Exclusive let of some or all of an asset at certain times 
• Sharing use of an asset with the council.
A group can contact the council through the wider community ownership and management process
to start to discuss if a participation request is a suitable option. More information on the process can
be accessed here. 
8. Assessment and decision-making    
The assessment of a request and any subsequent decision to proceed will consider the condition,
usage, value of the asset, the availability of other suitable premises from which the proposed activity
could take place and value for money offered by the proposal. The assessment will be made based
on the process outlined at appendix 4 using following criteria: 
• Details of the asset and type of request 
• Organisational capacity 
• Links to The Plan for North Lanarkshire 
• Community benefit and impact 
• Community support 
• Financial sustainability 
• Risk and social impact. 
The community organisation can indicate the price that they are willing to pay for the asset and the
council must consider the feasibility of agreeing a cost that reflects community benefit and council
operational requirements. Market value will be taken into consideration alongside community
Page 70 of 166

Page 71

benefit. This will inform the assessment and decision-making process, including securing the best
price as can reasonably be obtained to support council priorities.  
The council will provide to the applicant information it holds on the asset. The council will consider
requests for information on the asset submitted in writing, where this information is readily available
and deemed to be useful to the progression of the group’s application for ownership, management
or lease if the asset. Community organisations are encouraged to seek (and fund) any required
independent legal and technical advice relating to property condition and value.
Community asset fund
The council will establish a capital fund. Organisations can bid into this fund if they meet all the
criteria described in this policy for an asset transfer, a discounted lease or a participation request to
carry out capital works to assets.
An organisation must set out in their stage 2 request what their bid is for, how much they intend to
bid for and whether or not their CAT request is contingent on the bid. 
Bids and the detail of the proposed expenditure will be subject to approval by the council and other
terms and conditions will require to be adhered to.     
Governance arrangements 
The Corporate Community Ownership and Management of Assets Working Group is responsible for
overseeing the development of the policy and implementing the process for any requests received.
This group is made up of senior officers from across the council with practical experience and an
understanding of working with communities, management and transfer of community assets. 
On receipt of an application for ownership or management of a council asset an assessment sub-
group will be appointed to assess the application against the criteria set out in this policy. The sub-
group will consider policy, legal and financial risk to the council. They will assess the request and
present findings based on the assessment criteria to the Community Asset Ownership and
Management Leadership Group. The Leadership Group is made up of: 
• Chief Officer, Asset and Procurement  
• Chief Officer, Strategic Communication and Engagement 
• Relevant Chief Officer for the controlling service the asset being assessed 
• Chief Officer for key corporate functions as and when advice and expertise is required
(Audit and Scrutiny, Finance, Legal and Democratic).
For leases of 10 years or less or alternative agreements outwith ownership or lease the leadership
group has delegated authority to decide to approve or reject based on feedback from the assessment
panel.
For full transfer of an asset or leases of 10 years or more, the leadership group will make
recommendations regarding the request to the committee relating to the holding service for the
asset for endorsement. The applicant organisation is then informed of the decision within the
timescales agreed earlier in the process. 
Page 71 of 166

Page 72

An annual report will be submitted to the Communities Committee and used to inform the required
return to Scottish Government relating to Community Asset Transfer Requests and Participation
Requests under the legislation. 
The council may call upon specialist advisors to provide advice and inform the decision-making
process. 
In line with the requirements of the Community Empowerment (Scotland) Act 2015 the council will
aim to ensure decision are taken and communicated within a maximum of six months from
submission of application. Should an extension be required (for example to reflect committee cycles
or operational delays) this can be agreed in writing between the council and applicant.   
9. Successful outcome 
The outcome of any competent request will be communicated within six months of receipt. Where a
decision is in favour of the community group, discussion will commence to negotiate the terms of
agreement. The group must then make the council an offer and the expectation outlined in the
statutory guidance is that a contract would be agreed within six months of the offer being received.
It is acknowledged that this timescale may not always be achievable due to matters outwith the
control of both parties and therefore alternative arrangements may be put in place by mutual
agreement. Equally, where it is mutually beneficial to do so, matters can be concluded within a
shorter timeframe. Where the legislation around CAT is relevant Scottish Ministers can instruct that
more time can be taken to conclude the process.   
10. Unsuccessful outcome 
Review and appeal process  
Where a community group has not applied or does not meet the eligibility criteria under the
Community Empowerment Act the decision of the council is final and there is no route to review or
appeal. 
Where a group meets the CAT eligibility criteria and has submitted a request to be considered under
part 3 of the Community Empowerment Act the organisation may request that the council review
their decision. This review must be undertaken by Elected Members.  The Community Asset Transfer
(CAT) Review Panel is made up of a group of eight cross-party members. The internal review process
must be politically led and council officers can act only in an advisory capacity to the review panel. 
Elected members from the local area where the appeal has been received from and those who were
involved in any earlier committee decisions will not be able to participate in the review process.  
If an organisation is not satisfied after the internal review, they can appeal to the Scottish Ministers.
A review or appeal can be requested if the council:  
• Does not agree to their CAT request
• Does not make a decision by the time it should have
Page 72 of 166

Page 73

• The applicant organisation does not agree with the terms and conditions in the decision
notice. 
• Following review or appeal the council will send a new decision notice stating the new
decision and reasons for this. The following points apply to CAT reviews and appeals:  
• A community group has 20 working days after the decision notice to ask for a review or
appeal
• Other people who commented on the asset transfer request must be asked what they think
about the review or appeal
• All the papers about the review or appeal must be publicly available online
• The council or the Scottish Ministers can ask anyone for more information to help them
make a decision.  They can ask for the information in writing or hold a meeting so people can
tell them their views. They can also do other things, such as visiting the land or building the
request is about. 
11. Reporting   
The council is required to report annually on: 
• The number of CAT and participation requests received  
• The outcome of requests
• Any support put in place to support requests.  
The Corporate Community Ownership and Management of Assets Group will provide reports to the
Corporate Management Team and relevant committees regarding any requests received and
produce and make available annual reports to Scottish Government, committee and the public    
12. Approaches to Managing Risk  
The council recognises that there are inherent risks in Community Asset Transfer, community
ownership and management of assets both for the applicant organisation and for the council and has
in place mechanisms to ensure a consistent approach to managing these. Each request will be
considered on a case-by-case basis against robust criteria. The assessment and decision-making
criteria and process, and this policy, will help to manage and minimise risk and support positive
outcomes with and for local communities. 
The council will provide support or signpost the organisation to the relevant local and national
agencies for advice/ resources in managing the risks involved and to support and facilitate successful
asset transfer, management or lease of an asset. 
13.  Policy Review 
Page 73 of 166

Page 74

The council will continue to review this policy through annual reporting and in line with
any business needs, and/or changes in guidance associated with the Community
Empowerment (Scotland) Act 2015. 
Page 74 of 166

Page 75

Appendix 1
Community Empowerment (Scotland) Act 2015 parts 3 and 5
Community Asset Transfer (Part 5)
Part 5 of the Community Empowerment (Scotland) Act 2015 places a statutory duty on local
authorities and certain other public sector agencies to ensure a process for community ownership of
assets. This policy responds to the framework for CAT requests set out in the Community
Empowerment (Scotland) Act 2015 and provides the basis upon which the Council will manage
requests for the transfer, lease and management of assets (buildings or land owned by the Council)
including those made under the Part 5 of the Act. 
Community empowerment legislation includes the right for community organisations to request to
manage, lease or own an asset that is currently owned by North Lanarkshire Council. The council has
developed a transparent process for community ownership, lease or management of assets that
supports the implementation of the legislation and further information can be accessed here. Any
requests made under the terms of Community Empowerment (Scotland) Act 2015 will be managed,
assessed and delivered in line with the requirements of the act. However any requests from
community organisations to lease, manage or maintain will be assessed using the same criteria and
approach.
Part 3 - Participation Requests 
Participation requests are a way for people to have their say about what improvements they would
like to see made to public services they use. This is outlined in Part 3 of the Community
Empowerment (Scotland) Act (2015). By making a participation request, a community body, or a
group of people can start a discussion with the council about how to improve services. This may be
as simple as greater community involvement in a process or may be about negotiating and agreeing
for the community body to assume responsibility for making improvements within their local
community. The council must agree to the request or give a good reason why not. If the request is
granted, the community body will be invited to participate in an outcome improvement process. This
formal process will determine the finer details of any involvement or improvement work. It is
envisaged that the outcome improvement process will lead to an improvement in the way a service is
delivered or to improved outcomes for local communities and for local people. Ultimately
Participation Requests are a good mechanism to support community groups to enter into discussion
with the council to mutually agree an improved outcome for their community. 
Some groups may want to use council land informally or to assist the council to maintain or improve
a piece of land that they feel is of benefit to their community. This does not always need to result in a
formal lease or transfer of the asset. A Participation request provides an alternative formal route to
put in place arrangements for shared management, maintenance and use of assets where it is not
mutually beneficial to transfer the asset via property procedures. Guidance on participation requests
can be found here. 
Page 75 of 166

Page 76

Appendix 2
Community Ownership and Management of Assets flowchart 
1
•Initial contact with NLC via shared mailbox. One point of contact for first approach to the counci regardless of desired
outcome (ie full ownership, lease, participation request, etc)
2
•Record enquiry and notifiy Community Ownership Working Group for feedback re any coprorate considerations. Notify
Leadership Group for information at this stage
3
•Initiate communication with the organisation, sense check proposal and offer help and assistance, including signposting
to relevent external partners. Also consider alternative assets where barriers are highlighted. Provide overview of
options and highlight any eligibility criteria, discuss process and request more detailled proposal (Standrad form
mirroring assessment criteria). Agree best route
4
•On receipt of initial proposal/information, share with Community Ownership Working Group for feedback. If request is
for lease of less than 11 years and information is sufficient arrange an assessment panel meeting - Arrange to notify
group of date for decision.Arrange for Leadership Briefing and decision making.  If the request is for full ownership, long
term lease or requires more information/discussion go to step 5.
5
•arrange meeting with the organisation and representatives from relevant holding service, Estates and the Community
Partnership Team to undertand need and provide any advice/assitance or signposting. Agree timescale for updated
submission and route 
6
•On reciept of final proposal arrange assessment panel meeting and Leadership briefing and discussion, Identify
Committee timescales. Send goup validation letter with process and timescales. Identify key service link officers from
Estates, CPT and holding service 
7
•Undertake assessment and agree recommendations with Leadership Group. Present recommendations to Committee
and communicate to group with a decision notice letter explaining decision and right to review/appeal where
appropriate
Community Ownership and
Management 
Consideration process for all
community requests 
Page 76 of 166

Page 77

Appendix 3
ASSET TRANSFER REQUEST FORM 
This Community Asset Transfer request form must be completed to make a formal request. This form
will help you to make sure you include all the required information.
You should read the asset transfer guidance provided by the Scottish Government before making a
request.  The council may also provide additional guidance on scheme.
You are strongly advised to contact the council and discuss your proposals before making an asset
transfer request.  
When completed, this form and supporting documentation should be sent to
NLCommunityOwnership@northlan.gov.uk
Section 1: Information about the community transfer body (CTB) making the request
1.1 Name of the CTB making the asset transfer request  
1.2 CTB address.  This should be the registered address if you have one.  
1.3 Contact details.  Please provide the name and contact address to which correspondence in
relation to this asset transfer request should be sent.
1.4 Please mark an “X” in the relevant box to confirm the type of CTB and its official number, if it
has one. 
Company, and its company number is …………. 
Scottish Charitable Incorporated Organisation (SCIO), and
its charity number is ……………….. 
Community Benefit Society (BenCom), and its registered
number is ……………………………… 
Unincorporated organisation (no number) 
Please attach a copy of the CTB’s constitution, articles of association or registered rules.
1.5 Has the organisation been individually designated as a community transfer body by the Scottish
Ministers? 
No    ☐
Yes   ☐
Please give the title and date of the designation order: 
1.6 Does the organisation fall within a class of bodies which has been designated as community
transfer bodies by the Scottish Ministers?  
Page 77 of 166

Page 78

No    ☐
Yes   ☐
If yes what class of bodies does it fall within?  
Information about the land and rights requested
1.7 Please identify the land to which this asset transfer request relates.  
You should provide a street address or grid reference and any name by which the land or building is
known.  If you have identified the land on the relevant authority’s register of land, please enter the
details listed there.  
It may be helpful to provide one or more maps or drawings to show the boundaries of the land
requested.  If you are requesting part of a piece of land, you must give a full description of the
boundaries of the area to which your request relates.  If you are requesting part of a building, please
make clear what area you require.  A drawing may be helpful.
1.8 Please provide the UPRN (Unique Property Reference Number), if known. 
If the property has a UPRN you will find it in the relevant authority’s register of land. 
Section 2: Type of request, payment, and conditions
2.1 Please tick what type of request is being made: 
for ownership (under section 79(2)(a)) - go to section 3A 
for lease (under section 79(2)(b)(i)) – go to section 3B 
for other rights (section 79(2)(b)(ii)) - go to section 3C 
3A – Request for ownership
What price are you prepared to pay for the land requested? 
Please attach a note setting out any other terms and conditions you wish to apply to the request. 
3B – request for lease
What is the length of lease you are requesting?
How much rent are you prepared to pay? Please make clear whether this is per year or per month.
Please attach a note setting out any other terms and conditions you wish to be included in the lease,
or to apply to the request in any other way.
3C – request for other rights 
Page 78 of 166

Page 79

What are the rights you are requesting?  
Do you propose to make any payment for these rights?  
Yes   ☐
No     ☐
If yes, how much are you prepared to pay?  Please make clear what period this would cover, for
example per week, per month, per day?
Please attach a note setting out any other terms and conditions you wish to apply to the request.
Section 3: Community Proposal 
3.1 Please set out the reasons for making the request and how the land or building will be used
Benefits of the proposal
3.2 Please set out the benefits that you consider will arise if the request is agreed to.
This section should explain how the project will benefit your community, and others.  Please refer to
the guidance on how the relevant authority will consider the benefits of a request.  
Restrictions on use of the land
3.3 If there are any restrictions on the use or development of the land, please explain how your
project will comply with these.  
Restrictions might include, amongst others, environmental designations such as a Site of Special
Scientific Interest (SSI), heritage designations such as listed building status, controls on contaminated
land or planning restrictions.
Negative consequences
3.4 What negative consequences (if any) may occur if your request is agreed to?  How would you
propose to minimise these?
You should consider any potential negative consequences for the local economy, environment, or any
group of people, and explain how you could reduce these.
Capacity to deliver
3.5 Please show how your organisation will be able to manage the project and achieve your
objectives.  
This could include the skills and experience of members of the organisation, any track record of
previous projects, whether you intend to use professional advisers, etc.
Section 4: Level and nature of support
4.1 Please provide details of the level and nature of support for the request, from your community
and, if relevant, from others.  
This could include information on the proportion of your community who are involved with the
request, how you have engaged with your community beyond the members of your organisation and
what their response has been.  You should also show how you have engaged with any other
communities that may be affected by your proposals. 
Page 79 of 166

Page 80

Section 5: Funding
5.1 Please outline how you propose to fund the price or rent you are prepared to pay for the land,
and your proposed use of the land.
You should show your calculations of the costs associated with the transfer of the land or building and
your future use of it, including any redevelopment, ongoing maintenance and the costs of your
activities.  All proposed income and investment should be identified, including volunteering and
donations.  If you intend to apply for grants or loans you should demonstrate that your proposals are
eligible for the relevant scheme, according to the guidance available for applicants.
Section 6: Community Asset Fund
Do you propose to make a bid for capital grant to the Community Asset Fund?  
Yes   ☐
No     ☐
Is your request contingent on a successful bid to the Community Asset Fund?
Yes   ☐
No     ☐
How much are you bidding for? 
Please set out the detail of what your bid, if successful, will be spent on and how it contributes to the
benefits you have set out above. 
Signature
Two office-bearers (board members, charity trustees or committee members) of the community
transfer body must sign the form.  They must provide their full names and home addresses for the
purposes of prevention and detection of fraud.
This form and supporting documents will be made available online for any interested person to read
and comment on.  Personal information will be redacted before the form is made available.
We, the undersigned on behalf of the community transfer body as noted at section 1, make an
asset transfer request as specified in this form.  
We declare that the information provided in this form and any accompanying documents is
accurate to the best of our knowledge. 
Page 80 of 166

Page 81

Appendix 4
Assessment framework – all requests 
Name of Organisation/Applicant 
Details of the Asset 
Community Area/Ward  
Date submitted 
Date of Decision 
Recommendation Approve/Reject/ Defer
(delete as appropriate) 
Summary comments 
Final Decision 
Summary Grading Very
Strong
Strong Moderate Weak Very Weak
1.Details of the asset     
2.Organisation information     
3.Type of Request     
4.Link to TPFNL     
5.Community Proposal     
6.Support     
7.Financial Information     
8.Risk/Social Impact     
1 Details of the Asset – Includes asset status and proposed use
This section asks the council to ensure they are in a position to transfer the asset 
Page 81 of 166

Page 82

□ Very Strong:  The proposal has a cost saving, does not impact on council direct delivery or     
service and there are no restrictions on the asset transfer 
□   Strong: The proposal is cost neutral to the council, it does not impact on council direct      
delivery of services and there are no restrictions on the asset transfer. 
□  Moderate: the proposals presents difficulties on the council in terms of one or two of the 
following – direct cost, council direct delivery of services and or restrictions on the assets     
transfer. 
□  Weak: the proposals presents difficulties to the council in terms of cost, council direct 
deliver of services and restrictions on the asset transfer. 
□   Very Weak: unlikely to proceed because of ownership restrictions on the asset this would      
prevent a transfer of responsibility or ownership to another organisation. 
2 Organisational Information – Includes governance and capacity to deliver 
□  Very Strong: Applicant has clearly evidenced that they are a robust and viable organisation 
with effective governance arrangements in place. 
□   Strong: Applicant has provided adequate evidence that they are a robust and viable      
organisation with satisfactory governance arrangements. 
□  Moderate: Applicant has evidenced some signs of being robust and viable and partial      
information provided on governance arrangements. 
Page 82 of 166

Page 83

□  Weak: Applicant has shown no evidence of being robust and viable and no/little information     
being provided on governance arrangements. 
□   Very Weak: Applicant has provided no evidence of being robust or viable. Governance      
arrangement does not meet the criteria for asset transfer. 
3 Type of request, payment and conditions
This section confirms the type of request and seeks and whether or not the price reflects a
fair price for the asset taking into consideration community benefit 
□   Very Strong: Applicant has proposed acceptable terms, with prices reflecting Market/Fair 
Value. (score would reflect acceptable terms; for example – the right timescale for being      
able to complete the sale or lease and funds are already in place) 
□  Strong: Applicant has proposed terms, with prices reflecting Market/Fair Value. 
□ Moderate: Applicant has proposed terms, with prices well below Market/Fair Value. 
□ Weak: Applicant has failed to propose terms or prices. 
□ Very Weak: Applicant unsure of securing funding to afford costs. 
4 Link to Strategy– How the project links into the vision and ambitions set out in the Plan
for North Lanarkshire (TPFNL) 
□  Very Strong: Applicant has clearly evidenced that their project links in to the key themes of      
TPFNL 
□  Strong: Satisfactory evidence that the applicant understands the importance of linking to the
Page 83 of 166

Page 84

outcomes of the TPFNL 
□   Moderate: Limited evidence that the applicant understands the need to ensure the projects      
reflect one of more of the strands of the  TPFNL. 
□   Weak:  Little or no evidence that the applicant has made a clear connection to the TPFNL 
□  Very Weak: Applicant has no understanding of the TPFNL 
5 Community Proposal – Includes project aims, community engagement and community
benefit/need 
□Very Strong: Full consideration has been given to the aims, objectives and vision with clear      
thought to the future direction of the proposal. The proposal provides, for example, a      
social/economic/environmental impact. Comprehensive evidence of need/demand provided       
including consultations, research and surveys. 
□  Strong: Adequate description of aims, objectives and vision for the proposal. A good       
understanding of the community benefits including adequate evidence. Need/demand 
evidence include some consultation and research. 
□    Moderate: Limited description of the aims, objectives and vision for the proposal. Some       
understanding of the community benefit but not underpinned by substantive evidence. Some       
evidence of need/demand provided including limited consultations, research and surveys. 
□    Weak: Inadequate or no description of aims, objectives and vision for the proposal. Limited      
reference to community benefit and associated opportunities. No evidence of need/demand       
provided. 
Page 84 of 166

Page 85

□    Very Weak: No description of aims, objectives and vision for the proposal. No reference to       
community benefit. No evidence of need or demand provided. 
6 Support – Includes stakeholder engagement and partnership working
This section looks Including evidence community and stakeholders have been engaged 
□  Very Strong: Applicant has clearly demonstrated links with relevant stakeholders and groups      
as well as strong local partnership and community engagement. Evidence of joint responsibility      
for delivery of other projects/service. 
□   Strong: applicant has evidenced some partnership working arrangements. Relevant links with       
groups also evidenced along with strong community engagement activity. 
□    Moderate: Applicant has demonstrated limited links with groups and community engagement       
activity. Some evidence of partnership working provided. 
□    Weak: No/poor evidence of community involvement. No/poor evidence of partnership 
Working.
□   Very Weak: No evidence of community involvement. No evidence of partnership working. 
7 Financial Information – Includes fundraising, financial planning and management
We will seek clarification of funding being in place or any potential delay in funding being
in place in time for the final transfer deadline. 
□   Very Strong: Clear Evidence that sufficient financial resources are/will be in place by the time       
of transfer and good resource planning for short/ medium/long term sustainability       
demonstrated. Detailed, realistic and achievable income and expenditure, cash flow       
forecast provided along with a comprehensive contingency plan.
Page 85 of 166

Page 86

□   Strong: Evidence indicates that sufficient financial resources are/will be in place by the time of       
transfer and some resource planning has been demonstrated. Satisfactory income and       
expenditure and cash flow forecast. Some consideration has been given to contingency 
planning. 
□   Moderate: Applicant has demonstrated there are some financial resources in place but all       
finances may not be available within the timeframe. There is limited evidence of resource       
planning. Basic income and  expenditure and cash flow forecast induced with limited       
consideration given to contingency planning. 
□   Weak: Insufficient financial resources currently in place and unlikely to be ready within the       
Time frame. No evidence to demonstrate resource planning. No income and expenditure and       
cash flow forecast provided and no contingency plan outlined. 
□   Very Weak: No evidence of financial resources in place. No evidence of resources or financial 
forecast to predict cash flow. 
8 Risk/Social Impact – Includes potential impact and barriers/challenges and 
understanding of managing the asset. 
□  Very Strong: Full evidence that applicant has in place the necessary capabilities to manage the      
asset. Considerable awareness of the potential impact of the transfer on others, and      
barriers/challenges clearly identified. Comprehensive information provide on the anticipated      
social benefit/impact of the transfer and how this will be measured. 
□  Strong: Satisfactory evidence that applicant has the necessary capabilities to manage the
asset.     
Sufficient awareness of the potential impact of the transfer on others with consideration given     
to potential barriers/challenges. Adequate information provided on the anticipated social
Page 86 of 166

Page 87

benefit/transfer. 
□  Moderate: Limited evidence to demonstrate capabilities to manage the asset. Some
awareness     
of the potential impact of transfer on others and consideration given to potential     
barriers/challenges. Minimal information provided on the anticipated social benefit/impact of     
the transfer. 
□  Weak: Inadequate or no evidence of capabilities in place to manage the asset. Little or no 
awareness of the potential impact of the transfer on others or possible barriers/challenges     
identified. No social benefit/impact monitoring outlined. 
□ Very Weak: applicant has provided no evidence of capabilities to manage the asset. No     
awareness of the potential impact of the transfer on others. No social benefit or impact    
monitoring in place. 
Appendix 5
Scoring Matrix to inform discounted lease decisions at the discretion of the council 
Overall Rating from
assessment
(Appendix 4)
Potential
discount  
Additional information
VERY WEAK /WEAK  0   No approval 
MODERATE  Up to 10%  Discount would only be agreed in the moderate range where
there is a clear business case to support the application and is 10-20%% 
Page 87 of 166

Page 88

20-30%  at the discretion of the Council. The assessment would need
to take into consideration risk to the Council  
STRONG  30-40%  Actual agreed discount levels will be at the discretion of the
council and will reflect  
• The value of the asset (high value assets may have a
discount limit set)
• Proposed length of lease
• Any impact on future for the council
• potential income from the asset
• The condition of the asset
40-50% 
50-60% 
60-70% 
VERY STRONG  70-80% 
80-90% 
90-100% 
Page 88 of 166

Page 89

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    CommsStrat170424 Date 06/06/24 
Communications and Engagement Strategy 
From  Stephen Penman, Chief Officer (Strategic Communication and Engagement)  
E-mail PenmanSte@northlan.gov.uk Telephone 01698 302591 
Executive Summary
The Council has approved The Plan for North Lanarkshire – Delivering the New
Programme of Work to 2028, which outlines the ambition, vision and associated
deliverables that will improve the lives of people and communities in North Lanarkshire. 
The Communications and Engagement Strategy outlines an approach to achieve
maximum communication support for council priorities, ambitions and the activities and
projects outlined in the Programme of Work.   The strategy sets out a clear direction for
public-facing and internal communications and engagement activity as well as the core
principles underpinning the approach to deliver effective communications. 
Ensuring alignment with The Plan for North Lanarkshire and the Programme of Work is
key, together with demonstrating the effectiveness and success of communications and
engagement activity, which will be evaluated and measured annually to evidence positive
outcomes.
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1)  Approves the Communications Strategy. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (19) Improve engagement with communities and develop their
capacity to help themselves
Programme of Work All Programmes of Work
Item 7
Page 89 of 166

Page 90

1. Background 
1.1 The council approved The Plan for North Lanarkshire – Delivering the New Programme
of Work to 2028, which together with the agreed council priorities and ambition
statements, sets out the vision for North Lanarkshire. 
1.2 A council-wide corporate communications strategy has been in place since 2015, with
a revised version approved by Policy and Strategy Committee in May 2019 (V2).
Version 2 of the communication strategy clearly aligned how communications can
support the council’s wider ambitions as well as the delivery of The Plan for North
Lanarkshire and its associated programme of work. 
1.3 Annual evaluation reports for communications activity have demonstrated the value
and effectiveness of good, multi-disciplinary communications since the inception of The
Plan for North Lanarkshire. 
1.4 The third iteration of the strategy recognises the expanded structure of the Strategic
Communications and Engagement service and has been renamed the Communication
and Engagement Strategy. The service now incorporates the Community Partnership
Team, Customer Service Hub and Leadership and Operating Model and this
collaborative offer, alongside Corporate Communications, strengthens existing
networks to positively communicate with the public, partners and internal audiences. 
1.5 The new strategy also acknowledges the council’s requirement to adapt to changing
technology, communication methods and platforms and the increasing use of data
analysis to drive campaigns and information dissemination. 
1.6 The Corporate Communications Strategy is contained as an appendix to this report. 
2. Report 
2.1 The Communications and Engagement Strategy provides a formal strategic direction
and approach to the council’s communications activity. It sets out the story of North
Lanarkshire within the brand themes of Live, Learn, Work, Invest and Visit, which are
incorporated into all council communications and engagement activity, providing
consistency and coherence for the lifetime of The Plan for North Lanarkshire. 
2.2 The strategy outlines the approach that communications and engagement activity will
take to tell the story of The Plan for North Lanarkshire and how it can inspire action and
change for place, people and communities. The Programme of Work to 2028 and
beyond will underpin all communication and engagement activity, as well as other
‘business as usual’ activity emerging from council policy, services and initiatives. 
2.3 A framework with key principles, themes and approaches are summarised as part of
the strategic commitment to deliver responsive, relevant and smart communications
that help to build community resilience, keep people informed and enhance and protect
the council’s reputation.  These key principles are: 
• Engaging communities
• Working with others
• Focus on campaigns
• Focus on audiences 
2.4 All communications and engagement activity will be built on foundations that are: 
Page 90 of 166

Page 91

• Community focused
• Inspiring
• Informative
• Creative
• Challenging
• Driven by data
• Quality-governed
• Inclusive
• Integrated
• Responsive
• Linked to the Programme of Work 
2.5 The strategy also recognises the importance of internal communications, to enable 
staff to be informed, included and connected to the ambitions set out in The Plan for
North Lanarkshire and the projects within the Programme or Work. It is recognised that
a significant number of staff are also residents and can be ambassadors for services
and projects. 
2.6 Listening and engaging with seldom-heard voices within community groups is crucial
and the strategy acknowledges that these audiences will be considered in all
communications and engagement activity. 
2.7 Activity will be prioritised, aligned to The Plan for North Lanarkshire or centred around
the actions being taken across the council to ensure The Plan for North Lanarkshire
becomes a reality. Communications activity will help to deliver that, using the principles
and foundations outlined in the strategy. 
3. Measures of success 
3.1 Measuring the success or effectiveness of communications and engagement activity
is crucial to evaluating performance. 
3.2 Corporate communications will report annually in June to the Policy and Strategy
Committee on communications activity and its outcomes and impacts, linking this to
both key themes and to the Programme of Work. 
3.3 For community partnership and engagement, a report will be considered annually in 
June to the Communities Committee about the number of individuals and community 
organisations participating in the delivery of the local outcome improvement plans, 
including analysis of seldom-heard voices. 
4. Supporting documentation 
Appendix 1 - Communication and Engagement Strategy 
Stephen Penman
Chief Officer (Strategic Communication and Engagement) 
Page 91 of 166

Page 92

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The successful delivery of the Communications and Engagement Strategy
significantly contributes to reducing inequalities and inequities within communities
caused by socio-economic disadvantage by promoting support, information and
advice to affected individuals and communities. 
Seldom-heard voices and equality considerations are applied in all communications
activity to ensure equality of access to materials and information. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
Page 92 of 166

Page 93

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The significant advancements in digital technology is recognised within the
Communications and Engagement Strategy and a number of service processes
and platforms are subject to change or adaptation to ensure that the public are
provided with the best information on the right channels and platforms using the
most appropriate technology. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
A continued focus on a ‘digital-first’ approach has already led to a significant
reduction in paper-based communications and printed material for promotional
purposes. This approach will continue moving forward. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
This report contains information on the council’s Communication and Engagement
Strategy for approval. It outlines the strategic direction and fundamental principles
and foundations for the council’s communications and engagement activity and
how it aligns with The Plan for North Lanarkshire and the council’s priorities and
ambitions.  Successful delivery of the strategy will ensure that the public are
engaged, informed and more resilient. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
The Corporate Risk Register recognises the importance of the council being able to
communicate effectively and the strategy minimises risk. Ongoing assessments of
risk are made for individual campaigns. 
 
 
Page 93 of 166

Page 94

5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Individual campaigns, information or news can relate to in-service or former-service
personnel and their families and their needs are considered in communications. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
Many projects and activities relating to children and young people are supported by
communications and engagement activities. Individual projects incorporating
children and young people have appropriate safeguards in place (such as
photography/video consent) and individual requests are always considered
together with assessments of material to ensure they are appropriate. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 94 of 166

Page 95

Communications
and Engagement
Strategy
Version 3.0
Strategic Communication and Engagement
April 2024  
Page 95 of 166

Page 96

Communications and Engagement Strategy  2
Document control
Title Communications and Engagement Strategy
Owner Stephen Penman, Chief Officer,
Strategic Communication and
Engagement
Contact penmanste@northlan.gov.uk
Governance Group Policy and Strategy Committee
Author Stephen Penman
Carolynne Coole
Contact penmanste@northlan.gov.uk
coolemillerc@northlan.gov.uk 
Revision History
Number Originator Date Review Commenced Revision description/record of change
1.0 Original Strategy
2015
Stephen Penman 19.3.2015 Strategy approved
2.0 Updated strategy Stephen Penman 1.5.2019 Updated strategy approved 
3.0 Updated strategy
2024
Stephen Penman 15.4.24 Updated strategy incorporating wider service 
Document Approvals
Number Governance
Group
Date approval granted Date approval to be requested 
(if document still draft)
Original strategy Policy and
Strategy
19.3.2015 
2.0 Updated strategy Policy and
Strategy 
1.5.2019 
3.0 Updated strategy Policy and
Strategy 
6 June 2024 
Consultation Record (for most recent update)
Status of document consulted upon Version 3.0 Draft Corporate Communications Strategy
Stakeholders consulted/date Chief Executive (26.04.24) Council Leader (TBC), Convener of Communities
Committee (TBC), Managers of Corporate Communications (17.4.24),
Community Partnership Team (18.4.24), Customer Service Hub (18.4.24),
Leadership and Operating Model (18.4.24). 
Strategic Alignment
The Plan for North Lanarkshire and Programme of Work (including The Place The Vision).
Priorities and Ambition Statements in The Plan for North Lanarkshire:
Improve economic opportunities and outcomes
• Market and promote North Lanarkshire as the place to live, learn, work, invest and visit.
Support all children and young people to realise their full potential
• Enhance collaborative working to maximise support and ensure all our children and young people are
included, supported, and safe
• Engage children and families in early learning and childcare programmes and making positive transitions to
school.
• Engage with children, young people, parents, carers and families to help all children and young people
reach their full potential.
Improve the health and wellbeing of our communities
• Improve preventative approaches including self-management and giving people information and choice
over supports and services. 
• Ensure the highest standards of public protection. 
• Encourage the health and wellbeing of people through a rage of social, cultural and leisure activities.
Enhance participation, capacity and empowerment across our communities
• Improve engagement with communities and develop their capacity to help themselves.
• Improve the involvement of communities in the decisions, and development of services and supports, that
affect them.
Improve North Lanarkshire’s resource base
Page 96 of 166

Page 97

Communications and Engagement Strategy  3
• Continue to identify and access opportunities to leverage additional resources to support our ambition
• Build a workforce for the future capable of delivering on our priorities and shared ambition. 
Strategic Policy Framework, Strategic Governance Framework, Strategic Performance Framework, Programme and Project
Management Framework. 
Next review date
Review Date June 2029
Page 97 of 166

Page 98

Communications and Engagement Strategy  4
Introduction
Communication and engagement are crucial to achieving our ambition to make North
Lanarkshire the place to Live, Learn, Work, Invest and Visit.
This strategy sets out a clear direction for our public-facing and internal communications and
engagement activity. The work of Strategic Communication and Engagement has a positive
impact on the council’s ability to build community resilience, keep people informed and enhance
our reputation.
More than that, inspiring communities, supporting service delivery and changing behaviour
supports the Plan for North Lanarkshire and the Programme of Work. This requires a strategic
approach, creativity and challenge, using all the tools available.
Strategic Communication and Engagement already carries out sector-leading work. With this
integrated strategy, we believe that communication and engagement will continue to play a
significant part in delivering our ambitions. 
Councillor Jim Logue
Leader
North Lanarkshire Council 
Councillor Kenneth Stevenson
Convener of the Communities Committee
North Lanarkshire Council 
Page 98 of 166

Page 99

Communications and Engagement Strategy  5
Our story
This is North Lanarkshire. It’s the place to Live, Learn, Work, Invest and Visit. 
Our ambition means economic regeneration and growth that benefits everyone in North
Lanarkshire and responding positively to social, economic and technological change.
We are improving the lives of everyone who lives, works or visits here by driving inclusive
economic growth, increasing skills and generating jobs and training opportunities. By doing so,
we will reduce poverty and inequality.
We recognise that achieving our vision can’t be done alone. We work in partnership with others,
and we involve people in communities, sharing our ambition with them.  
Page 99 of 166

Page 100

Communications and Engagement Strategy  6
Our strategy
We will deliver outstanding communications and engagement activity that helps to ensure North
Lanarkshire is the place to Live, Learn Work invest and Visit.
The quality of our work matters in delivering the council’s policy priorities, The Plan for North
Lanarkshire, and the Programme of Work to 2028 and beyond.
To achieve this we will tell the story of North Lanarkshire as the place to Live, Learn, Work, Invest
and Visit and inspire action. We will engage people in communities. All our activity will be
targeted, measurable and have impact. Crucially, communications will be responsive, relevant
and customer-focused. It will be based on outcomes, not outputs. And it will be smarter; using
data and insight to deliver the right message to the right person at the right time.
Engaging communities
Community engagement is critical to the success of the Programme of Work. Through the work
of the Community Partnership Team we will work with people and organisations in communities
to help them have a voice in the work of the council and to mobilise more collaborative working.
Working with others
The Plan for North Lanarkshire involves all community planning partners. The ambitions in the
Plan can only be achieved with clear, consistent communication and collaboration and we will
work with partners to ensure that our collective communication and engagement efforts are
targeted appropriately.
Focus on campaigns
As the council’s services continue to change, we will devote most of our resource to campaigns
which change behaviour and drive advocacy as these are essential to the efficient delivery of
services. These campaigns will be tied to SMART objectives, creatively bold and provocative
where necessary, aimed at ensuring a measurable impact.
Focus on audiences
We will always choose the most appropriate channels and language to communicate with
people, groups and communities.  
Page 100 of 166

Page 101

Communications and Engagement Strategy  7
How we work
By utilising the full suite of communications and engagement disciplines and tools including
campaigns and marketing, strategic consultancy, digital, brand and multi-media creative support,
public relations, internal communications, community engagement, customer service and major
events, we bring information to life for people and communities in North Lanarkshire. 
Our communications will be:
Community focused – we will foster a sense of community spirit that is supportive of taking
positive action. By championing behaviours and attitudes, and listening to the voices of people in
communities, we can promote community empowerment and participation. Our
communications will help keep people safe, informed and connected to their community. 
Inspiring – we will tell people what we are doing and planning to do through The Plan for North
Lanarkshire and the Programme of Work, reinforcing a positive vision for the future and working
collaboratively.
Informative – our work should direct people to the information and customer service routes they
need and are most appropriate to them, helping people to help themselves and making
communities more resilient. We highlight support for businesses, guidance on protecting the
environment and how community groups and businesses can access funding and support. We
provide clarity and reassurance in times of emergency, signposting those in need to access the
most applicable support and advice. This work demonstrates how services and policies make a
positive impact on people, businesses and communities.
Linked to the Programme of Work – the council’s Programme of Work sets out what we will
achieve together. Our communications and engagement will support the delivery of the
programme and will help to achieve the outcomes contained within each programme theme.
Creative – we will use the full range of creative skills to ensure our messages are compelling,
embracing digital innovation, video, animation, photography, design and writing and using
channels that are relevant, relatable and accessible to individual audiences. 
Challenging – our communications will be frank and forthright, encouraging people to change
their behaviour or take action. 
Driven by data – the council’s investment in digital technology is firmly aligned to
communications, which are driven by insight from analysis of data and service need and
underpinned by technological advancements in automation, AI and social media algorithms. This
flow of information serves up the right message at the right time, targeting and personalising
where possible, to make communications more effective and efficient. Activity will deliver
meaningful behaviour change while enhancing customer experience. 
Quality-governed – incorporating professionalism and practice, systems, standards and guidance
through an operating model that provides a consistent approach to delivering communications.
Inclusive – we will consider our audiences when planning campaigns or utilising our
communication platforms to ensure they are as accessible as possible and where applicable, can
be adapted to an appropriate format on request. We will make every effort to ensure
communications comply with legislation and are published in line with appropriate regulations,
involving relevant people and organisations for advice. 
Integrated – whether through multi-disciplinary campaigns or through the collaborative
networks developed with partners. Our own internal networks will enhance delivery to ensure a
joined-up approach to communications and public engagement. 
Page 101 of 166

Page 102

Communications and Engagement Strategy  8
Responsive – our work listens to communities and individuals, providing or signposting to the
right information they’re looking for. Often, that information will be served up organically
through data analysis and other times, that will through collaboration and two-way
communication methods. 
Page 102 of 166

Page 103

Communications and Engagement Strategy  9
Live Here
North Lanarkshire has is a welcoming, vibrant place where people want to live.
We acknowledge our history but we recognise we have a much bigger future.
We have a great mix of housing, facilities, services and transport links. We’re transforming our
town centres and helping people to live longer in high quality housing.
We are creating hubs in towns and communities which meet the needs of residents able to
access schools as well as community facilities and partner services.
People in communities will build resilience and we will engage with them to ensure their needs
can be met.
Learn Here
All young people in North Lanarkshire can achieve their full potential. They will be equipped to
make their way in life through quality, exciting and challenging learning. We will work to close the
poverty-related attainment gap and improve attendance at school.
Learners of all ages will have the skills to take advantage of the employment opportunities our
growing economy brings, and we will have a flexible, resilient and skilled workforce.
Our schools are inclusive, energetic places which take into account the needs of all young people
and provide them with the learning, teaching, facilities and technology to ensure they have
experiences which last a lifetime.
Work Here
We have a dynamic, diverse and growing economy with a great mix of small, medium-sized and
large businesses.
People in North Lanarkshire are connected to employment and have the support they need to
access jobs. They have skills appropriate to the needs of employers and are supported, no
matter their background, needs of economic circumstances.
We provide great places to work, with engaged, ambitious people who are ambassadors for the
services they provide.
Invest Here
North Lanarkshire is the best location for business. We have excellent transport links, a strong
employment market, a skilled workforce and flexible land and premises, with an outstanding
digital infrastructure.
Businesses have the support to establish, grow and succeed, and are able to develop new
products and markets to create and sustain quality jobs.
Our services are aligned to help businesses locate, grow and succeed and we make it easy for
businesses to talk to us.
Visit Here
North Lanarkshire is a great place to visit and play. Our tourism sector is growing, with improved
opportunities and attractions.
We offer distinctive experiences which provide value for money and are accessible to all. This is a
place for active, healthy lives, where the right facilities are developed in the places they are
needed and can be enjoyed the most.  
Page 103 of 166

Page 104

Communications and Engagement Strategy  10
The Programme of Work to 2028 and beyond
The council has approved its Programme of Work to 2028 and beyond. The programme is
managed through seven strategic boards, each with a delivery plan approved by the council in
March 2024.
We will align our work priorities with those in the delivery plans, ensuring that good and effective
communication is incorporated in the delivery of each programme board’s priorities and making
a measurable contribution to those deliverables.
Transforming Places
To plan and coordinate public and private sector investment to deliver transformational change
across town centres and local communities at pace, and to attract more people to live, learn,
work, invest and visit within North Lanarkshire, improving economic outcomes and the health
and wellbeing of residents. 
This programme will involve attracting new (and sustaining existing) populations to create
sustainable communities and a stable demographic spread that supports economic growth. This
will mean enhancing greenspace, place and housing and integrating services to improve health,
wellbeing and social outcomes as well as accelerating investment for job creation. We will
provide access, physically and digitally, to local and regional opportunities to support business
development and survival, as well as enabling urban and rural families to thrive.
Invest in North Lanarkshire
To support and accelerate investment in North Lanarkshire, and the council’s own investment
programme, through a collaborative, streamlined, advisory service to help grow and sustain the
local economy and communities. This programme will play a key role in facilitating employment
opportunities and the associated infrastructure critical to supporting continued population
growth and net inward migration. 
Sustainable Futures
To focus commitments to net zero carbon and climate resilience and the associated energy
solutions and investments required to make it a reality. This programme will bring essential
momentum to the council’s commitment to achieve net zero by delivering an integrated
approach to carbon reduction through more innovative energy generation and efficiency. This
will be delivered along with a programme of climate adaptation, in partnership with local
communities, to ensure local infrastructure and lifestyles are ready for the impacts already
embedded due to climate change.
Brighter Futures
To support and improve educational attainment, employment opportunities, entrepreneurship
and volunteering, and prepare young people and the wider community for the future through
specialised education, voluntary work and enterprise. This programme will give people the skills,
knowledge and confidence to successfully transition to further education, training or
employment. We will shape innovative employment pathways and maximise key industry growth
sectors to boost economic growth, providing opportunities to develop real-world job skills that
add value and pathways to specific industries. We will help to offer choice and inclusive access to
jobs and training.
Resilient People
To deliver whole family support locally, when families need it, in a way that addresses the
impacts of poverty and reduces inequality. This programme will provide an integrated approach,
Page 104 of 166

Page 105

Communications and Engagement Strategy  11
working with partners, to an earlier and more effective response to need. This includes
promoting the strengths and skills of individuals and families increasing economic activity and
providing practical and emotional support.
This will integrate family support with the town and community hubs to maximise opportunities
for community-led and strengths-based approaches, and ensure families receive the right
support when they ask for it and in their own community. This approach will break down referral
pathways built around the needs of systems rather than people, which are at best confusing and
at worst stigmatising.
Digital North Lanarkshire
To develop a skilled digital workforce, promote an innovative, sustainable culture, and be the
digital leader for North Lanarkshire. This programme will be a key enabler in delivering the other
programme of work priorities and driving economic growth, as well as transforming the
education and abilities of learners of all ages.
One Service
To ensure services are delivered, regardless of owner, in a streamlined, efficient and supportive
model. This programme will be a key enabler in delivering the other programme of work
priorities and ensuring the council delivers services (regardless of structures of the alignment of
functions) in line with the overall vision of growth and prosperity for all. 
Page 105 of 166

Page 106

Communications and Engagement Strategy  12 
Internal communication
We recognise that most of the council’s staff not only work for the council but are also residents
of North Lanarkshire.
We want our staff to be ambassadors for the services we provide, and we commit to keeping
them informed about issues that affect them directly as well as telling them about the council’s
ambition, policies, the Plan for North Lanarkshire and the Programme of Work.
As part of our work, we will celebrate our employees’ successes and achievements in a way
which best represents the services of the council.
Seldom-heard voices
We recognise that some people and groups of people are at risk of their voices being seldom-
heard by public bodies. It is essential that we target appropriate engagement activities for these
groups.
Groups of people can be seldom-heard due to, for example:
• disability 
• ethnicity
• sexuality
• difficulty with communication 
• mental health problems 
• homelessness 
• geographical isolation 
• experience of living in poverty
• being offenders or ex-offenders
• being victims of domestic abuse
• being part of the traveller community 
This list is not exhaustive. It is important to understand that, while some people and sectors
could be characterised as seldom-heard, it is not necessarily true for everyone in a broader
group. Consideration always needs to be given to characteristics within a group for each piece of
engagement.
We will always ensure that our engagement work considers the particular needs of people who
are at risk of be seldom-hard, for example by considering where and when we engage, what
methods are most appropriate, and what additional support may be required.
Measuring success
We will measure all communications and engagement activity to ensure alignment with the
Programme of Work and to demonstrate positive outcomes.
For corporate communications, we will report annually in June to the Policy and Strategy
Committee about our work and its outcomes and impacts, linking this to both our key themes
and to the Programme of Work.
For community partnership and engagement, we will report annually in June to the Communities
Committee about the number of individuals and community organisations participating in the
delivery of the local outcome improvement plans. 
We will measure the engagement we have with equalities groups and those whose voices are at
risk of being seldom-heard, and levels of participation in community events and local activities.
Page 106 of 166

Page 107

Communications and Engagement Strategy  13
We will report on the outcomes of activity aimed at community use of council assets and the
number of groups being supported to increase resilience in communities.
While many of these areas will be routinely reported to committee, we will incorporate all of
these in an annual report to demonstrate the progress we make. 
Page 107 of 166

Page 108

Page 108 of 166

Page 109

North Lanarkshire Council
Report
Policy & Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    SP/ST Date 06/06/24 
Leadership and operating model – One Service POW 
From  Stephen Penman, Chief Officer, Strategic Communication and Engagement  
E-mail tennants@northlan.gov.uk Telephone 07973 726 159 
Executive Summary 
This report sets out the progress made to date against the Leadership and Operating Model
phased transition plan previously approved by Policy and Strategy Committee on 16th
March 2023. It outlines key learnings to date and sets out future planned activity in line with
delivery of the plan for NL programme of work to 2028. The report demonstrates clear
dependencies across all seven programmes of work and also illustrates the joined up
working across services and teams to deliver improved outcomes for our communities. 
The report makes reference to the ongoing economic challenges and uncertainties ahead.
It confirms our plan to conduct a sensitivity analysis to re-examine these uncertainties that
undoubtedly have an impact on the operating model transition plan. The analysis will also
help guide and inform future investment decisions as part of the current and future Strategic
Capital Investment Programme. 
Recommendations
It is recommended that Policy & Strategy Committee: 
1) Recognise and acknowledge the progress made to date against the approved
leadership and operating model transition plan
2) Approve the direction of the programme in phase 2 aligned to the Plan for NL
programme of work as summarised in next steps and illustrated in Appendix 3
3) Note the robust alignment, joined up working and collective effort to deliver
improved outcomes across the plan for NL programmes of work as we transition  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (24) Review and design services around people, communities,
and shared resources
Programme of Work One Service
Item 8
Page 109 of 166

Page 110

1. Background 
1.1 Policy and Strategy Committee approved the strategy, guiding principles, and
prioritisation matrix linked to the Town and Community Hub Programme at the meeting
held on 19th March 2020. 
1.2 The Leadership and Operating Model programme of work and phased approach was
also approved at Policy and Strategy Committee at the meeting held on 16th March
2023. 
1.3 Both programmes are now incorporated into the Plan for North Lanarkshire programme
of work delivery plans under Transforming Places and One Service and all projects
therein are delivered in line with awarded capital funding. The current position following
the outcome of the Strategic Capital Investment programme 24/25 to 28/29 allocates
£250 million to continue investment in the town and community hub programme and
c.£2.4 million to deliver the approved asset rationalisation programme through asset
reconfiguration. 
1.4 No specific funding has been allocated to carry out adaptations to the current education
estate to grow the number of integrated community hubs across communities as we
transition towards a fully integrated operating model for new town and community hubs. 
1.5 It is fundamental therefore that through the hubs that have been delivered to date, those
planned, and the delivery of the ongoing approved asset rationalisation, that our focus
continues to ensure the investment delivers facilities that will effectively enable
supports and services to be delivered in ways that meet the needs of the whole
community while continuing to work across services to identify need and opportunity to
adapt the existing estate where possible. 
1.6 To maintain this focus during phase 2 of the programme over the next three years we
will continue our effort to co-design supports and services from the bottom up with
communities and we will use this critical phase to work with services to look at how they
will transition their future workforce to hubs as our vehicle for the delivery of community
services. We will also prioritise the deliverables within the Digital NL programme to
provide the underpinning digital infrastructure and technology required to facilitate new
ways of working with residents across communities. 
1.7 Given the degree of ongoing economic uncertainty ahead in relation to issues such as
interest rates, house building, and government funding, which impacts our ability to
grow the number of community hubs as the vehicle for delivery of community services,
a sensitivity analysis to re-examine these uncertainties will be undertaken in December
2024. 
2. Report 
Town and Community Hub strategy and development  - progress to date 
2.1 The council has made good progress in the delivery of new community hubs with three
new hubs (Newmains/St Brigid’s, Riverbank, and Chryston) opening in 2023.
Contractors are in the process of building the new hub at Orbiston in Bellshill, and two
new hubs (St Kevin’s and Gartcosh) received planning approval in April 2024. These
hubs are progressing well and should be on site in the coming months. Further projects
Page 110 of 166

Page 111

are at design or planning stage (Chryston High extension, and St Stephen’s) with
construction anticipated to commence towards the end of 2024. 
2.2 Further funding, as stated in section 1.3, has been provided to continue the creation of
new hubs within the current five year Strategic Capital Investment programme (2024-
2029) and it is expected that an update will be presented to the September Policy and
Strategy Committee, on the funding allocation, the priority projects, and the associated
assessments and rationale linked to proposals. 
Leadership and operating model and asset rationalisation – phase 2 progress to date 
2.3 The Leadership and Operating model programme of work and its three phased
transition approach was approved at Policy and Strategy Committee on 2nd December
2021. The phase 2 high level plan for 2023-25 and the seven key pillars of work were
approved at Policy and Strategy Committee on 16th March 2023. 
2.4 Since then, in line with the Programme of Work (POW) to 2028 the governance of the
programme has been incorporated into the One Service POW that also incorporates
the One workforce priorities approved at Policy and Strategy Committee on 7th
December 2023 and has clear interdependencies with the Digital NL POW. High level
achievements to date were reported to Policy and Strategy Committee on 14th March
2024. The following sections of the report set out more detail on these achievements
and progress against each of the seven pillars within phase 2: 
Extending the use of hub spaces to public sector partners 
2.5 The North Lanarkshire Partnership Strategic Leadership Board on 9th February 2024
approved a memorandum of understanding, developed with the Council’s legal team,
to ensure the objectives of shared access to hub spaces are clear and everyone knows
what is expected, it also firms up arrangements and a route for escalation should it be
required. This is a key step forward to enable closer working together and enhance our
ability to reach people in the local communities, particularly those at risk of poor
outcomes. There are also clear financial benefits to this asset partnership approach
with savings made through asset rationalisation, co-location and sharing of spaces. 
2.6 Partners are now beginning to access the hubs for their community based staff and are
raising awareness of the hubs and their facilities by holding team and multi-agency
meetings. NHS Neurodevelopmental team are co-located from Newmains, Riverbank
and Chryston hubs some of the week to build presence, relationships and support early
prevention. Barnardo’s as the Commissioned Service approved to deliver our model
for early and inclusive whole family support will be co-located from a small number of
hubs, as the model is introduced between April and July 2024. We expect demand to
rise in the coming year across partners and increased use by community and voluntary
organisations as our work on whole family support progresses under the Resilient
People POW. Furthermore, work is underway by our Facilities Support service to
strengthen our marketing plan to promote community facilities on the Council’s website
and build on the team’s existing relationships with local community and voluntary
organisations. 
2.7 A Community Engagement Event supported by the Council’s Community Partnership
Team was held at Newmains & St Brigid’s Community Hub on 27th March 2024. The
event brought together community and voluntary sector organisations from the Wishaw
area with the aim of building presence of the hub to encourage use of its modern and
well equipped spaces, as well as improve signposting to local supports and services
for the organisations themselves and the local community. Feedback from the event is
Page 111 of 166

Page 112

currently being reviewed and will be taken forward in the first instance by our
Community Learning and Development team with their parent voice focus group, and
through the Health and Social Care partnership group leading the national co-design
work on ‘Getting it Right for Everyone’ (GIRFE). Similar events are taking place at both
Riverbank and Chryston Community hubs in the coming months. 
Alignment with the hub strategy and development programme 
2.8 The approved guiding principles adopted to inform the hub strategy programme are in
place to ensure that each new development hub delivers spaces in which new ways of
working can be facilitated and enabled as part of the design and build (i.e. the zones
that will be provided). 
2.9 As each hub moves into operation, overseen by the operating model delivery team, key
learnings continue to guide future design as well as promote the value of co-location of
services, partners, and the shared use of facilities within each hub. A lessons learned
exercise using the Council’s Project Management framework is conducted for each new
development hub and shared through ongoing liaison with the hub strategy team. 
2.10 Some early lessons have been applied to existing and future projects such as;
extending the reach of co-design with communities, improving the marketing plan and
communications strategy around promotion and booking of community spaces with the
workforce and community and voluntary organisations, improved signage and
wayfaring for hub users, providing greater privacy in line with trauma design principles
to glass partitioned meeting rooms, installation of cycle parking racks and storage to
support the Council’s Active Travel strategy, progressing with plans to install out of
hours access control for community based staff to get access to welfare facilities, and
providing staff development relative to the vision for community hubs as they transition
into their new facility to encourage and promote the behaviours needed to make the
model a success. 
2.11 Specifically in line with the hub guiding principle of ‘Designing with rather than for the
community’ the operating model team have been working with Council Services and
partners to extend our reach of engagement with residents to inform the future design
of supports and services. Since February 2023 more than 500 people have been
engaged in workshops or individual journey mapping to capture their experiences of
our services, asking them what they need, how this could be improved or delivered
differently and mapping their journey’s through different pathways of support. Much of
the feedback to date emphasises the importance of place-based approaches and how
important local assets and the physical environment is for people accessing supports
and services so that they feel welcome, confident, secure, and safe as they engage
with Council, partner agency and community and voluntary sector organisations. 
2.12 Appendix 1 provides an overview of the level of engagement undertaken thus far, the
key themes that have emerged and how this relates to moments throughout people’s
lives and the possible zones required in community hubs as the vehicle for delivery of
community services. This co-design approach will continue through phase 2 as we
operationalise our model for early help and family support through the community hubs
as part of the Resilient People POW delivery plan approved at Education, Children and
Families Committee on 12th September 2023, and the recent approval to award the
contract to Barnardo’s as the commissioned service by Education, Children and
Families Committee on 27th February 2024. The learnings will continue to inform the
design and build of future town and community hubs in parallel with any required
service redesign that will be undertaken. 
Page 112 of 166

Page 113

Asset place based approach to maximise use of current assets 
2.13 Taking an asset place based approach to the programme is key to realising the full
potential of assets across North Lanarkshire. Bringing together resources through
integrated service delivery is fundamental given the challenging economic and financial
landscape we continue to face as we seek to improve outcomes for North Lanarkshire
residents. 
2.14 Ongoing service redesign is driving and informing the design and reconfiguration of
Council assets and future design of new development community hubs. As we deliver
the approved asset rationalisation programme teams are co-locating and implementing
more integrated models of services delivery that will over time improve our citizen
experience from first point of contact through improving pathways to support and
providing a more holistic offering of supports and services, including those delivered by
partner agencies. 
2.15 Examples of this can be seen through the capital investment made to reconfigure
Coatbridge Community Centre, Buchanan Centre in Coatbridge as the town hub, the
redesign and refresh of Bron Way to enable the demolition of Fleming House as part
of the Cumbernauld transition plan, redesign of Dalziel Building to accommodate teams
who relocated with the closure of Scott House, continued investment in the Civic
Campus to support the revised hybrid model, and optimising the use of space at the
new Bellshill Transport Hub. Teams from Housing, Social Work, Home Support,
Libraries and Legal and Democratic are working together to agree and implement new
ways of working, informed by input from residents. This will see improved systems and
processes introduced and the implementation of more integrated digital technologies
in the coming 12-24 months  to strengthen pathways to support and improve the overall
customer experience. 
2.16 Our commitment to being a trauma informed organisation approved at Wellbeing and
Tackling Poverty Committee on 26th April 2024, and the trauma informed design
approach to these projects is seeing improved design and organisation of spaces within
the facilities particularly around entrances, front facing reception spaces and their
connection to staff areas and private spaces.  This offers improved interaction with staff,
more flexibility around how spaces are used and over time will create environments
that provide a sense of empowerment and reduce stress and tension for residents. 
2.17 We will push forward with plans to identify where future integrated community hubs will
be feasible and viable through an options appraisal process in readiness for future
capital investment should the opportunity be presented for re-prioritisation within this
five-year programme and for a potential bid in the next five-year cycle. 
Implementing early adopter hubs 
2.18 With the recent investment decisions approved as part of the Strategic Capital
Investment programme 24/25 to 28/29 and the continued uncertainty ahead due to the
economic and financial challenges we face, it is important that we learn and gain
confidence as to what works with communities, ensuring that we design and develop
our hub provision to better meets their needs and will have a greater impact on
outcomes due to the involvement of individuals who will access them. This is key to
inform any reprioritisation of projects and investment in future years. 
Page 113 of 166

Page 114

2.19 In parallel the Council will continue to transition towards a future operating model which
will see greater reach into our communities through more integrated service delivery
and community led approaches that will see all services take forward significant
transformational change. Following phase 1 delivery to create hubs within the existing
estate and as new development hubs have been introduced each hub has been
operationalised to test a new approach. 
2.20 One specific example is the Newmains & St Brigid’s Community Hub in Wishaw. The
project has progressed by establishing a Hub Delivery Group to oversee a plan for the
hub, whilst operating within existing management structures, as services continue to
redesign and reorganise. A case study example is shown in Appendix 2. Other hubs
are moving forward in the same way and the focus will be to direct available resources 
to deliver whole family support locally as part of the Resilient People POW priorities. 
2.21 This will introduce a more integrated approach led by the Commissioned Service and
working with partners to take an early and inclusive approach. Contract mobilisation is
now underway. Barnardo’s and associated community and voluntary partners will
deliver direct support to whole families across North Lanarkshire and reach into the
local community through engagement and co-production, to both identify needs and
inform the development of a service that is continually responsive to need. Over time,
it is intended that the service will develop peer mentoring opportunities so families have
the choice to receive support from people with lived experience and will place economic
help at the heart of family support, working with our employability services, to ensure
families have improved opportunities for work experience, skill building and education. 
2.22  Building on the local engagement with the community and partners in the development
of the community hub, the service will initially be launched from Newmains and St
Brigid’s Community Hub. Barnardo’s has immediate capacity to deliver in Wishaw and
has a plan to expand within one month to cover a further location. Recruitment is
underway to expand the service so that it can cover across North Lanarkshire within a
6-month period, subject to recruitment and community need, using community hubs
and other community bases to ensure accessibility for families. The service will accept
self-referrals and referrals from agencies within the GIRFEC approach. Barnardo’s are
already engaged in the Children’s Services Planning Partnership to ensure the service
works well with existing services and is currently working on publicity and other
information materials to maximise accessibility for families. 
Underpinning systems and processes for the operating model 
2.23 Key to the successful implementation and operation of the early adopter hubs, as well
as supporting new ways of working and maximising the occupancy and use of our
existing assets is the design and delivery of effective ICT solutions and the technical
management support around these. Therefore, as we plan for and continue to adapt to
new models of service delivery there are a number of areas that continue to feature in
this phase. 
2.24 These include; working with services to gather requirements and user profiles, pulling
together an understanding of existing hardware in meeting, training and conference
rooms in the education estate as we seek to maximise and be creative about the use
of space in our model, connecting with the business and digital team on the roadmap
for digital transformation across services, making sure digital solutions are in place
relative to hub operations i.e. business intelligence support around needs and demand,
hub space booking, demand analysis and channels for early engagement and
customer contact, self-service or assisted self-service technology, referral and
assessment systems, user printing and scanning in a hub setting, keyless entry/remote
Page 114 of 166

Page 115

monitoring and controlled access requirements, public wi-fi prioritisation within the
connectivity project, and continued focus on business intelligence, quality control, and
performance data, feedback and reporting. 
2.25 Through working closely with the Digital NL POW we aim to understand better how
technology will enable future service delivery models alongside mapping how staff will
best operate to support services within a different future model of delivery, which is
likely to require new types of roles, skills and patterns of work which are very different
from those we rely on to deliver our services today.  One of the first steps has been a
digital maturity survey that will help inform service readiness for future change. Through
the Digital NL improving customer experience group we will take forward plans to
implement digital zones in hubs in support of digital inclusion priorities as we continue
to push more service online and provide blended support to residents.  
Service transition to a future operating model 
2.26 As set out in the One Workforce report presented to Policy & Strategy Committee on 
7th December 2023 within the context of ongoing challenging workforce pressures, and
the Council’s medium term financial challenges, all services across the Council are
thinking creatively about their future operating models and how they redesign to deliver
services that meet the needs of our communities in the future. 
2.27 Between April and November 2024 all Chief Officers with their nominated service lead
will present their plans to progress their own workforce transition to our future operating
model through the One Service Board.  This will enable support and challenge on
proposals set out and further opportunities to be discussed or proposed. Through this
process all services are considering which of their functions could be operated in a
more streamlined, integrated and placed based model and which should remain within
a more corporate or North Lanarkshire wide service delivery footprint to maximise
economies of scale and efficiency of service delivery. Further thought will also need to
be given to the opportunity for shared services in line with ongoing financial challenges
and planned public reform. 
2.28 Aligned to all of this, our workforce plans will form a key pillar of this ongoing process
of realignment and transition and as we define revised structures and new roles and
structures to support our revised delivery model. This will be fundamental as we design
the operating model for town and community hubs from the bottom up, with greater
focus on the required workforce roles, skills, and behaviours we will need to deliver
prevention and early intervention within a more universal service delivery offering for
our residents who need support at a community level. 
2.29 A critical element to service redesign and linked to the Digital North Lanarkshire
programme of work, is establishing how digital technologies will advance future service
delivery models and mapping how teams and individuals will best operate to deliver
services within a future model of delivery. This is likely to see new types of roles, skills
and patterns of work being introduced meaning a transformational shift in what we rely
on to deliver our services today. 
2.30 The Council through the governance of the One Service Board will maintain an updated
rolling One Workforce plan of work to support the delivery of our priorities and strategic
aims to 2028. Updated reports will be presented to CMT twice yearly. 
2.31 Workforce change deliverables that may emerge as a consequence of the operating
model will be managed within each service area through existing processes and
HR/Finance support routes. Chief Officers and their management teams are
Page 115 of 166

Page 116

responsible for ensuring that all workforce change and any matters arising are
managed appropriately in line with emerging plans 
Delivering for the community 
2.32 To support planning for the provision in our future hubs one of our guiding principles is
to ‘design with rather than for communities’. Within this work, it has also been key to
build a coherent and wide understanding of local organisations, recognise their
contribution and prepare to involve them in our plans. Working in partnership with the
Community Partnership Team, we have established a database of organisations by
Community Board area and continue to review stakeholder maps that set the
foundations for closer working in line with the direction of the recently launched
CommUnity agreement. 
2.33 Building on the work of the community ownership working group we are developing a
more coherent policy for community use and strengthening our marketing strategy and
communications plan to better promote community facilities and the spaces therein.
Work is currently underway with the Facilities Support service and Active and Creative
communities colleagues to improve the Council website in support of this and to
augment the implementation of a new corporate booking system approved at the
Communities committee on 5th February 2024. As this work progresses, Community
Hub pages will be created on the website and we will make better use of the ‘My Town’
social media pages to create stronger identities for the hubs to build presence, promote
their offer and encourage communities to be involved in both accessing and delivering
a provision that meets local needs. 
Next steps 
1. Ongoing delivery of the hub strategy programme applying learnings from current
projects and community co-design and operationalise new development hubs as
they are introduced. 
2. Deliver approved asset rationalisation through reconfiguration of existing assets to
maximise the use of our asset portfolio and optimise utilisation of all space in line
with allocated funding from the strategic capital investment programme 2024/25-
2029/30. 
3. Services present their Workforce transition plans to the One Service Board between
April and November to demonstrate plans and progress of service redesign
underway or planned that will enable the transition towards our future operating
model. 
4. Work in partnership with services to progress targeted proof of concepts to deliver
early help and inclusive family support by testing and learning through the
community hubs to inform future model service delivery of a more community led
approach. 
5. Embed the principles of trauma design within the built environment by 2028, starting
with the development of a trauma design framework aligned to the place principles,
and through the creative design of our hubs, assets and their spaces and town
centre plans. 
6. Continue to support the ambitions of the active travel strategy by identifying needs
and behaviours and investing in appropriate solutions on our projects. 
Page 116 of 166

Page 117

7. Take a phased approach to implementing smart technologies in our hubs in support
of digital inclusion priorities through the introduction of digital zones as we continue
to push more service online and provide blended support to residents. 
8. Conduct a sensitivity analysis tied to the strategic capital investment programme
and planned review process to guide future investment decisions including linked
to the  options appraisal process to guide options for adaptation of the existing
education estate to grow the number of integrated community hubs across our
towns.   
3. Measures of success 
3.3.1  A number of measures are outlined in the project brief against the three phases of
delivery to show how we are delivering for communities through improved outcomes
and support the management of risk/mitigate impacts of adverse events. Each test of
change hub project will develop its own impact framework given the local context.   
Examples are:  
• Hub usage data and user feedback
• Level of integrated working/partnerships evidenced in hub delivery plan 
• Access and engagement by target groups 
• No. of contacts/people supported relative to general advice, financial
inclusion/debt money advice, literacy/language skills/qualifications, employability,
digital inclusion etc.
• Social media reach/user feedback
• Occupancy and usage of hub spaces
• Reduction in demand for additional/intensive statutory services 
• Number of organisations applying for/receiving grant funding contributing to
delivery
• Number of people accessing assisted self-service in the hubs 
• Number of volunteering or placement opportunities available in hubs
• Number of hub volunteers who achieve accreditations/qualifications/employment 
• Comparison of usage across buildings within NLC (will feed into development of
new builds and potential future use)
• Progress of LOIP’s and outcomes agreed as part of future hub delivery plans that
contribute to the outcomes set in the plan for North Lanarkshire 
The programme overall: 
• Provide an operational focus point for other projects and programmes to realise
their financial and non-financial benefits e.g., shared asset rationalisation, service
reconfiguration, service re-design proposals for integrated provision   
4. Supporting documentation 
Appendix 1- Overview of Community Co-design linked to the operating model to get it right
for everyone (GIRFE) and improve health outcomes
Appendix 2-  Newmains & St Brigid’s  - One year of operation case study
Appendix 3- High level plan for phase 2 delivery of the Leadership and Operating Model
programme
Page 117 of 166

Page 118

Stephen Penman
Chief Officer, Strategic Communications and Engagement  
Page 118 of 166

Page 119

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The implementation of town and community hubs and ambitions to reduce the
inequalities caused by socio economic disadvantage align with the requirements of
the Fairer Scotland Duty. 
The EQIA for phase 2 has been completed and EQIA’s are completed for required
projects and in partnership with services. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The strategic capital investment programme allocation is a key factor, investment in
town and community hub programme and towards delivery of approved asset
rationalisation is critical to ensure hubs are designed or reconfigured as the vehicle
for delivery of community services. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The impact of any workforce changes emerging during phases of the programme will
be dealt with in line with the council’s Managing Workforce Change - Framework
Guidance. 
We must ensure that any changes to approaches as our future workplace model
matures are reviewed and supported by policies and guidance. Full engagement with
Trade Unions will be taken forward as required. 
Safety and wellbeing implications around access, safety and security and also
safeguarding. Safety and security guidance is continually updated and made
available on the future workplace section of myNL. The safety and wellbeing team
will continue to work with local teams to advise appropriate measures are in place at
a local level around safety, security, fire safety and first aid. Communications and
engagement with management teams of key workforce groups will also take place
as appropriate, and toolbox talks encouraged with staff as necessary. Furthermore,
Page 119 of 166

Page 120

the approach taken is intended to have a positive impact on mental health and
wellbeing and TU’s will be engaged as appropriate through existing channels. The
safety and wellbeing team are engaged on the POW steering group and continue to
advise and guide through phases. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Extending our use of hub spaces to public sector partners in phase 2 required a
Memorandum of Understanding to be in place to support objectives of this
agreement and to ensure consideration towards insurance liabilities and statutory
requirements around safeguarding. This was supported by legal colleagues who
will continue to be engaged through delivery phases – particularly relative to the
impacts of public sector reform
. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☒ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☒ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
There is a specific set of digital requirements if the operating model is to achieve its
ambitions. A number of these are already in place and need to be maintained or
are in development.  There is currently work to pull together emerging
requirements and detailed work with the business and digital team on this
additional capability and digital infrastructure will be required in support of the
model – plans for this are underway and the appropriate governance structures will
be applied. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Page 120 of 166

Page 121

Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Enabling staff to work locally has a positive impact on the environment and an
individual’s carbon footprint around commuting, as well as potential positive health
impacts by enabling greater choice and flexibility to how people work. The shift side
to that is the utility use/office energy consumption through a work local approach
(although within the wider context of shared assets, asset rationalisation and
investment in more energy efficient buildings and hubs positive benefits should be
realised over time) 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
There is significant impact around communication and engagement with
communities and with staff – the programme continually has a requirement to align
with the emerging direction of our approaches.  Communication and engagement
plans are developed throughout each stage of the POW and colleagues from
Strategic Communications and Community partnership team continue to be
involved throughout phases of delivery 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The project risks are captured in the project risk register and managed through the
programme and projects, as well as linked POW’s own risk registers and actions.
The main risks at present are around:
• Finance – capital review and ability to deliver against ambitions, risk to
savings not being realised through service redesign for a new model
• Digital – ability to meet the infrastructure and technical support needs either
through lack of resources, lack of funds, or alignment of pace
• Political unknowns – implications of savings decisions and public sector
reform
• People – challenge of culture change to underpin the success of the model
• Communities – ensuring full involvement of communities and realising the
ambition of the Community Boards. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other residents in the provision of public services. 
Page 121 of 166

Page 122

• Our approach to participation planning to ensure that all residents with lived
experience are included in co-design/co-creation of services, and we
engage with relevant organisations
• Completion of the EQIA 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
Approach to early help and inclusive support outlined in the report. 
An overarching CRWIA has been completed as part of the preparation for the new
Children’s Services Plan 23-26.  The Children’s Services Plan 23-26 includes
priorities and actions on how the Children’s Services Partnership will further
children’s rights and UNCRC in NL. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☒ No ☐ 
Page 122 of 166

Page 123

Appendix 1    Getting it right for everyone (GIRFE) co-design with communities overview 
Page 123 of 166

Page 124

Appendix 1 continued… 
Page 124 of 166

Page 125

Appendix 2 -  Newmains & St Brigid’s Community Hub – First year of operation 
Background
Newmains & St Brigid’s Community Hub opened its doors in February 2023 bringing together Newmains
and St Brigid’s primary schools and Newmains Family Learning Centre. Located in the heart of
Newmains, the hub aims to become the focal point for community engagement and support in the area
and has embarked on a transformative journey to address the community’s needs and promote social
inclusion, moving beyond the traditional learning and teaching curriculum. In strategically aligning its
vision and initiatives to the overarching plan for North Lanarkshire and Local Outcome Improvement
Plans, the Council is committed to strengthening the impact of the hub to the local community. The first
12-months of the hub in operation has laid a solid foundation to build on delivering for our communities.
Establishment of a Hub Delivery Board
The establishment of the Hub Delivery Board in January 2023 laid the foundation for a collaborative
approach, bringing together representatives from Council Services, Scottish Fire and Rescue, NHS
Lanarkshire, University Health and Social Care Partnership, Health Improvement, Routes to Work and
VANL. The boards inception set the stage for strategic decision making and the development of a hub
delivery plan.
Community Engagement 
Hosting the first community engagement event in March 2023 provided an opportunity for local services,
partners, and voluntary organisations to highlight their offerings to the community. The event garnered
valuable feedback from parents. They identified and prioritised concerns such as poverty, health and
wellbeing, loneliness, anti-social behaviour, and support for families. This feedback played a crucial role
in shaping hub delivery plan and future activities and services offered from the hub. Additionally, two
newsletters providing information on the hub have been issued to the community using social media
pages and using Group call text messaging service.
Expansion of Service Offerings
In April 2023, Active and Creative communities started delivering Zumba classes every Wednesday
evening, which was well received by the community. This was followed by the introduction of yoga
classes in November 23, demonstrating commitment to promoting health and well-being through
exercise. In addition, the Tackling Poverty Team offered monthly drop-in surgeries, providing vital
support and resources to those in need. These sessions offered opportunities for individuals to access
financial assistance, as well as receiving empathetic guidance on navigating challenging circumstances. 
Partnerships and Collaborations
Established partnerships with NHS Lanarkshire, New College Lanarkshire, Routes to Work and
Voluntary Action North Lanarkshire seen collaboration to deliver programs and support the community. 
• NHS Lanarkshire’s Health Improvement Team delivered a breastfeeding event which seen the
collaboration of services and brought together local breastfeeding groups to promote early
intervention, and provided an educational opportunity for P7 pupils, fostering understanding and
normalisation of breastfeeding within the community – another event is in planning for June
2024. 
• Routes to Work delivered the SPF 31 program, a place-based project funded by the Shared
Prosperity Fund which aimed to engage with people in Newmains who were economically
inactive. The program offered peer mentors recruited from the local area and intense
engagement offering pre-employability and personal development activities with a dedicated
case worker. 
Page 125 of 166

Page 126

Appendix 2 continued…
• North Lanarkshire Council, NHS Lanarkshire, and New college Lanarkshire offered a ‘Care
Academy’ learning experience for P6 and P7 pupils from the hub to take part an innovative and
certified micro course represented a pivotal collaboration aimed at equipping young learners
with practical skills and essential knowledge in the dynamic fields of health and social care. 
Through immersive half-day sessions, pupils were immersed in subjects designed to ignite their
curiosity and passion for caregiving professions. From exploring STEM applications to delving
into the intricacies of digital healthcare and dementia care, the course offered a comprehensive
overview of critical aspects of the healthcare sector. The pilot placed a strong emphasis on
fostering an inclusive and diverse learning environment, with sessions dedicated to
understanding gender equality within health and social care roles. Young people also
experienced the whole graduation experience at New College Lanarkshire. 
Use of the hub spaces 
The availability of spaces has facilitated diverse community activities and services, with the football pitch
being particularly popular among local football clubs. Additionally, services and partners have actively
used the meeting spaces, fostering collaborative efforts and constructive engagement. These spaces
have facilitated discussions, planning sessions and joint initiatives. A recent development is the
facilitation of a family support group for those affected with drug and alcohol addiction. This collective
use underscores the hub’s pivotal role as a venue for multi-stakeholder collaboration and the delivery
of essential community services and support.
Key Learnings
Multi-stakeholder collaboration and community engagement is key in establishing the hub delivery plan
to provide a diverse range of services and activities to meet the needs of the local community.
Addressing the challenge of transforming the perception of the hub from school to a multi-functional
community resource, requires ongoing commitment to foster the culture shift and maximise the hubs
potential as a central community resource. Staff awareness sessions and roadshows will continue to
deliver the message of the plan for North Lanarkshire. In addition, our One Workforce plan and work
local approach should continue to encourage more staff towards the hub and see more frontline staff
using it for rest and welfare purposes as well as to deliver in reach and outreach supports and services. 
Future Plans
The focus for the next 12-24 months is the mobilisation of the commissioned service for early help and
inclusive family support funded by the Whole Family and Wellbeing Fund and the introduction of housing
surgeries signifies the commitment to sustained community empowerment and support. Concurrently
we will continue to build presence of the hub, aiming to optimise the use of available space in the evening
and at weekends, this will be supported by an improved marketing strategy and communication plan
and development of the Council’s website.  
Page 126 of 166

Page 127

Appendix 2 continued - A visual illustration of how hub zones have been used beyond learning and teaching
Working together to promote and link offer
Newmains & St Brigid’s Community Hub
Tenant’s par�cipa�on
conference
Breas�eeding event
Shared use of conference
room & mee�ng spaces
across partners
Care Academy Pilot
School into College partnership
P6/7 pupils
Cost of living surgeries
Housing support drop ins Zumba classes
Yoga
classes
Addic�ons support
Neurodevelopmental team
co-located part �me
Routes to work & CLD
employability and skills /
cooking on a budget
Parent Council Private events
and func�ons
Intergenera�onal
mentoring programme
Feb 24 - 8 clubs
375 football pitch &
main hall bookings
NCT
Sco�sh Govt Guiding Coali�on mee�ng
Page 127 of 166

Page 128

Appendix 3 – Delivering phase 2 of the Leadership and operating model and asset rationalisation plans 
Page 128 of 166

Page 129

North Lanarkshire Council
Report
Policy & Strategy Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    FW/PMcC Date 06/06/24 
One Workforce - Summer Placement Programme 
From  Fiona Whittaker, Chief Officer People Resources  
E-mail mccaffertypa@northlan.gov.uk Telephone 07973 729532 
Executive Summary 
The development of a next generation workforce for the Council is a key priority set out in our
One Workforce Plan, agreed by Policy & Strategy in December 2023. As part of this, in July
2023, the Talent and OD team (TOD) commenced a pilot summer placement programme
offering Council Services the opportunity to employ a young person for six weeks over the
school summer break. The purpose of this placement was to give young people valuable work
experience and to introduce them to the different types of rewarding work available in Local
Government, particularly in areas which have traditionally been hard to attract young people
into. The first year of the programme saw 23 young people successfully placed across Chief
Executives, Adult Health and Social Care and Enterprise and Communities, with all 23 young
people finishing the programme and securing a positive destination at the end. 
Following on from the success of this pilot, approval was given at CMT in November 2023 to
repeat the programme in the summer of 2024 with an initial proposal for 40 paid placements.
This report seeks to update Policy & Strategy Committee on the progress that has been made
both with the very successful 2023 pilot, and our plans to extend the programme in 2024 for
placements both across the Council, and in other sectors where there is known future
workforce demand with placements due to start in June for six weeks. We are delighted to
report that to date, both Council services and local businesses have come forward and offered
a total of 112 paid placements for young people to secure work experience through the
summer break of 2024.   
Given the success of the programme over the last two years, our intention for future years will
be to maintain a summer placement programme to support both our One Workforce Plan and
our broader commitments within the wider Brighter Futures Programme of Work which aims
to support and improve attainment and employment opportunities, entrepreneurship and
volunteering across North Lanarkshire and in key employment sectors. 
Recommendations
It is recommended that Policy & Strategy Committee: 
1) Recognise and acknowledge the success of the pilot programme in 2023 and its
contribution to building the Council's next generation workforce. 
2) Support the summer placement programme for 2024 which will offer 112 paid
placements to young people in North Lanarkshire.
Item 9
Page 129 of 166

Page 130

1. Background 
1.1 During the summer of 2023, 23 young people gained work placements across the
Council through the pilot Summer Placement Programme. The purpose of this
programme was to recruit young people into a variety of service areas within the
Council to introduce them to areas of work they may not have previously considered as
part of their future career planning. 
1.2 To facilitate the programme, all Chief Officers were asked to return a demand proforma
indicating whether they could accommodate a paid work placement (grade NLC3) in
their service.  All services responded offering the following placements: 
• Adult Health and Social Care – 9 places in the Joint Equipment Store and 9
Administrative placements
• Enterprise and Communities – 1 place in Waste and Fleet
• Chief Executive’s – 1 place in Business and Digital, 3 places in the Employee
Service Centre 
1.3 The placement opportunities were sent to all North Lanarkshire school establishments,
the Pathways Programme, the Promise Team, New College Lanarkshire and Senior
Education and Families Managers to gauge interest and encourage young people to
consider the opportunity.  All those interested were given job descriptions and
employee specifications for the placements and asked to complete an expression of
interest form highlighting their skills, experience and suitability for the programme.  In
total 53 applications were received which were then shortlisted and interviewed with 23
young people successfully achieving a placement. 
1.4 The young people started their placement on 3rd July following a short induction and
remained on placement until 11th August.  Throughout the programme, they had weekly
contact with the TOD team to review progress.  One of the most notable outcomes of
the programme was the enthusiasm with which the young people undertook their
placement.  They completed all tasks assigned to them and performed at a consistently
high level. 
1.5 Importantly, and in terms of the real tangible benefits of this programme, 21 young
people have secured a sessional contract with the Council, one gained employment as
a Home Support Worker and the final young person accepted a place on our MA in
Housing programme. At the end of the placement, there was a celebration event for
the young people to recognise completion of the programme.   
1.6 Based on the success of this programme, a proposal was submitted to CMT to
implement this on an annual basis.  The proposal was based on offering potentially up
to 40 paid placements each summer across all services of the council, however based
on feedback from the services and an appetite to provide greater opportunities for our
young people, we have now secured 112 paid placements. 
The Plan for North Lanarkshire
Priority  Support all children and young people to realise their full potential
Ambition statement (6) Raise attainment and skills for learning, life, and work to
enhance opportunities and choices
Programme of Work Brighter Futures
Page 130 of 166

Page 131

2. Report 
Programme for July 2024
2.1 Building on the success of our 2023 programme we have incorporated several
learnings, which will be included in the roll out of our 2024 programme, and these
include: 
- Increasing the lead in time for recruitment and organising IT equipment.
- Recognising what worked well including having in place a robust recruitment
and selection process.
- Enhancing support from colleagues across Education to fully promote the
opportunities.
- Having a structured induction process for the young people to ensure they
feel supported from day 1. 
2.2 Based on the lessons learned a number of adjustments have been made to the
programme including a revised timeline for implementation by starting the recruitment
process earlier.  We also approached schools earlier and interviewed applicants in
March prior to study leave in April ensuring it did not interfere with exam preparation. 
The induction week will take place in June prior to the placements starting in July. 
2.3  We have also provided access to a broader spectrum of placements by linking with the
services in areas which are particularly hard to recruit to or areas where young people
may not consider as a future career choice.  We also extended the induction
programme to cover all essential areas before the young person starts in placement. 
2.4 The new timeline for implementation is detailed below.  By starting the process in
November/December we have given the team time to work with all stakeholders
ensuring placements were identified and secured well in advance of expressions of
interest going out.  It also gave the team time to ensure all HR processes were in place
and adhered to.   
Recruitment and progress to date
2.5 As detailed in the timeline above, Services were approached in November 2023 via a
demand pro-forma to indicate interest in providing placements for the summer
programme 2024.  All services responded and a total of 92 placements were offered
initially.  This increased to 112 with local businesses in the Built Environment sector
offering additional opportunities.  The breakdown of placements is detailed below:
Built Environment based roles 20
Clerical/Corporate based roles  38
Assistant Sport Coach 9
Care based roles 45
Total 112
Nov - Dec
Demand
Planning
Jan
HR processes
eg job
descriptions
created,
Jan
Communi-
cations out
to promote
opportuni-
ties
Feb
Applications
received
Mar
Shortlisting
and
interviews
June
Induction
week
July–Aug
Placement
Page 131 of 166

Page 132

2.6 Throughout the month of January, all HR administrative processes were completed
including creating job descriptions, agreeing grades for posts and planning the
recruitment process.  With those in place, adverts were created and information on all
opportunities were sent to all school establishments, the Pathways programme, the
Promise team and Senior Education and Families Managers to raise awareness of the
programme.  Pupils who responded were issued with an expression of interest form
which they had to complete, get endorsed by their teacher and send to TOD for
consideration.  In total we received 249 applications from pupils across our Secondary
Schools and local Colleges.  The breakdown of applications and the numbers who
secured a place across all establishments is detailed below: 
Establishment Number of applicants Successful following
interview
Airdrie Academy 5 2
Bellshill Academy 1 1
Brannock High School 13 6
Calderhead HS Shotts 4 2
Cardinal Newman High
School 
23 11
Chryston High School 2 1 
Clyde Valley High School 2 2
Coatbridge High School 7 5
Coltness High School 26 9
Cumbernauld Academy 2 1
Dalziel High School 3 2
Greenfaulds Academy 11 7
Kilsyth Academy 12 7
New College Lanarkshire 3 0
Our Lady’s High School
Cumbernauld
22 5
Our Lady’s High School
Motherwell
26 11
St Aidens High School 13 7
St Ambrose High School 15 6
St Andrews High School 27 13
St Margarets High School 8 6
St Maurices High School 1 0
Taylor High School 21 7
Uddingston Grammar 1 0
West Lothian College 1 1 
2.7 Of the 249 applications received, after shortlisting and eligibility checks, 154 were
interviewed, with 112 successfully matched to a placement.  In addition, 17 have been
placed on a reserve list should any of the successful candidates withdraw. 
2.8 Work is now underway to ensure everything is in place for the 112 candidates starting
at the end of June.  the programme will run for six weeks during the summer. 
Managing the Programme
2.9 The programme will be managed by the Early Careers team which sits within the Talent
and OD team.  As well as a line manager for their placement, each young person has
been allocated a link person from TOD who will meet with them weekly to review
Page 132 of 166

Page 133

progress on their placement and act as a support/mentor throughout the duration of
their placement. 
2.10 As mentioned above, there will be an induction at the start of the programme which will
be extended to 3 days as opposed to 1.  This will allow the young people to meet each
other and network, meet their line manager and TOD link person, complete mandatory
learning and complete any outstanding paperwork before commencement of the
placement.  This should ensure that they feel adequately supported before going out
to placement. 
2.11 Throughout the placement, they will be managed on a day-to-day basis by their line
manager who will allocate tasks and support them to learn how to do those tasks.  The
roles have been designed to give each young person as full an experience as possible
to help inform future career options.  The link person within TOD will check in with them
weekly to review the tasks they have been assigned, provide pastoral support and help
them resolve any issues or challenges they may be experiencing. 
2.12 At the end of their placement, they will all be asked to complete an evaluation about
their time on placement.  Where possible and in line with the pilot programme, they will
be invited to apply for opportunities within the Council including vacancies and
opportunities on the sessional register. 
2.13 As with the previous programme, on completion there will be a short celebration of
achievement ceremony which all young people will attend with their line manager and
link person.  Senior managers will also be invited from across the Services to celebrate
with the young people. 
2.14 The summer placement programme is an exciting opportunity for our young people to
gain valuable work experience. With the success of the pilot programme and the
increase in numbers for the 2024 programme, it is hoped we will see an increase in the
number of young people applying for our MA programmes, vacancies within the Council
and consider careers they may not have thought of before.  The enthusiasm that the
young people brought last year to the programme had a positive impact on our staff
and we hope to see that again this year. 
3. Measures of success 
3.1  The measures of success for this programme will include: 
- Positive experience for our young people.
- Positive destinations for participants on the programme including opportunity to
apply for jobs/sessional contracts.
- Confirmation from services of a commitment to the 2025 programme. 
4. Supporting documentation 
4.1 Appendix 1 – Programme process map 
Fiona Whittaker
Chief Officer (People Resources) 
Page 133 of 166

Page 134

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The programme will target all young people in our school establishments and those
under employability programmes or currently in first year of college.  The
programme has the ability to reach young people who may be affected by poverty
or unable to access similar opportunities. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes  ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
The financial impact is related to existing budgets.  All placements are paid for from
the Service budget or existing vacancies.  Where a Service decides to offer a paid
placement relevant budget discussions have taken place with Finance. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Placements will be employees for the duration of their placement therefore will
require to follow all relevant HR policies and procedures. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact
Page 134 of 166

Page 135

Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Work may be required involving corporate communications to support a suitable
comms campaign to advertise opportunities going forward. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact
Page 135 of 166

Page 136

Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
This programme has the potential to offer opportunities to young people up to the
age of 18. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 136 of 166

Page 137

Appendix 1 – Summer Placement Programme Process Map 
Page 137 of 166

Page 138

Page 138 of 166

Page 139

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref  AA/REB Date 06/06/24 
Annual Review of Whistleblowing Procedure 
From  Archie Aitken, Chief Officer (Legal and Democratic)  
E-mail aitkena@northlan.gov.uk Telephone 07939 280 102 
Executive Summary
North Lanarkshire Council’s Whistleblowing Procedure provides a mechanism for
employees and other workers in the Council to report a concern about serious wrongdoing
within the Council and to do so with security and in confidence. 
The annual review of the Whistleblowing Procedure has been undertaken on the use of the
Whistleblowing Procedure and on any amendments required to the Procedure. 
Recommendations
It is recommended that Policy and Strategy Committee: 
(1) Gives consideration to the contents of the report.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (14) Ensure the highest standards of public protection
Programme of
Work Statutory/corporate/service requirement
Item 10
Page 139 of 166

Page 140

1. Background 
1.1  The act of reporting concerns or wrongdoing in the public interest either within an
organisation or externally, for example to a regulator or the press, is known as
“whistleblowing”.  The Employment Rights Act 1996 as amended by the Public Interest
Disclosures Act 1998 provides the legal framework for whistleblowing. 
1.2 If a disclosure meets statutory requirements, workers who have blown the whistle are
protected by the Public Interest Disclosures Act 1998.  This legislation provides the
legal baseline, but there are other steps, not mandated by the law, that an employer
can take to encourage effective internal whistleblowing and to protect whistleblowers. 
The most important of these is to develop and implement an effective and appropriate
whistleblowing policy.  Whistleblowing policies are important and should comply with
best practice in regard to content and procedure. 
2. Report 
2.1 The whistleblowing legislation imposes no positive obligation on an employer to
encourage whistleblowing, implement a whistleblowing policy or in relation to what an
employer is required to do if a disclosure is received.  The law does, however, provide
that an employer should refrain from dismissing workers or subjecting them to any other
detriment because they have made a protected disclosure.   
2.2 North Lanarkshire Council, as a public body, is expected to have a whistleblowing
policy as our whistleblowing arrangements are considered as part of our annual audit
process.  Whistleblowing plays an important role in safeguarding effective delivery of
public services and ensuring best value.  North Lanarkshire Council is committed to a
culture which views raising concerns of malpractice as a valuable contribution towards
its efficiency and effectiveness and assuring workers that they will be treated fairly and
that their concerns will be properly addressed. 
Annual Review of the Whistleblowing Procedure 
2.3 North Lanarkshire Council’s Whistleblowing Procedure (attached as Appendix 1) has 
been reviewed and no amendments requiring approval are considered necessary at 
this time.  This is on the basis that the principal objectives of the policy and procedure 
remain: 
2.3.1 to convey the seriousness and importance that North Lanarkshire Council
attaches to identifying and remedying wrongdoing; 
2.3.2 to encourage workers to raise concerns internally as soon as possible and to
give them the confidence to do so; 
2.3.3 to remind workers of the standards of behaviour expected of them; 
2.3.4 to ensure workers know who to approach with a concern, and to enable them
to bypass the person, management level or part of the organisation to which
the concern relates; 
2.3.5  to outline the procedures for investigating disclosures and what steps might be
taken if wrongdoing is uncovered; and 
2.3.6. to make it clear what will happen to those who victimise genuine whistleblowers
or abuse the system by making malicious allegations.
Page 140 of 166

Page 141

2.4 North Lanarkshire Council’s Whistleblowing procedure sets out the legal protections
available to whistleblowers.  There are further sources of help and guidance; 
2.4.1 Chief Officers are designated as advisers to whistleblowers in identifying
whether the concern falls under one or more of the categories or should be
better dealt with under a different procedure; 
2.4.2 There is access to an external counselling hotline in terms of the Employee
Assistance Programme; and 
2.4.3 Protect, the whistleblowing charity who provide a confidential independent
helpline for whistleblowers is referred to in the procedure. 
Annual Review of the use of the Whistleblowing Procedure 
2.5 Since the last review in 2023, Education and Families received one whistleblowing
report. 
2.6 A thorough and comprehensive investigation into the matters raised concluded that
there was no substance to the allegations made.   
3. Measures of success 
3.1  Further review of the application of the Whistleblowing Procedure will ensure that the
Council’s resources and reputation are being safeguarded and that the Council’s good
governance standards are being maintained.   
4. Supporting documentation 
Appendix 1 - Whistleblowing Procedure. 
Archie Aitken
Chief Officer (Legal and Democratic) 
Page 141 of 166

Page 142

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
 
 
Page 142 of 166

Page 143

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 143 of 166

Page 144

Appendix 1 
Public Interest
Disclosure
Whistleblowing  
Page 144 of 166

Page 145

Whistleblowing  2
Document control
Title Whistleblowing
Owner Archie Aitken Contact aitkena@northlan.gov.uk
Governance Group Policy Strategy
Author Archie Aitken Contact aitkena@northlan.gov.uk 
Revision History
Number Originator Date Review Commenced Revision description/record of change
1  May 2024 Updated to reflect staffing changes         
Document Approvals
Number Governance
Group
Date approval granted Date approval to be requested 
(if document still draft)
1 Policy and
Strategy
Committee 
6 June 2024         
Consultation Record (for most recent update)
Status of document consulted upon Consultation with Stakeholders carried out February 2022
Stakeholders consulted/date Joint Trade Unions
JNC for Teaching Staff 
Strategic Alignment
Improving the Council’s Resource Base – Ensure the highest standards of public protection. 
Next review date
Review Date May 2025
Page 145 of 166

Page 146

Whistleblowing  3
Preamble 
The purpose of this procedure is to provide a mechanism
for employees, officers, consultants contractors and
workers to report to the Council a concern which they
have that there is serious wrongdoing within the Council
– and to do so with both security and confidence. It draws
on the rights and obligations contained within the
Employment Rights Act 1996, the Public Interest
Disclosure Act 1998, and the Enterprise and Regulatory
Reform Act 2013.
This procedure for reporting concerns at work is based
on the following principles: 
•  fair and reasonable treatment at work; 
•      the right to report concerns reasonably believed to 
be in the public interest; 
•  confidentiality; 
•  openness and accountability, and 
•      honesty and integrity. 
Page 146 of 166

Page 147

Whistleblowing  4 
1. Introduction 
1.1 In the course of your employment you may become aware of serious wrongdoing in the
Council or you may have information regarding malpractice. This procedure outlines the
steps you should take to bring serious situations to the attention of the Council, and has
been designed to provide guidance to employees on reporting incidents of malpractice or
wrongdoing.  It indicates how matters can be expedited thoroughly, discreetly and, so far
as possible, in a confidential way if that is necessary. This procedure outlines:- 
•  what sort of concerns may be reported; 
•  the employees covered by this procedure; 
•  the nominated individuals in the Council who can be contacted regarding your
concerns; 
•  the appropriate steps to be taken to report serious wrongdoing or malpractice; 
•  how a matter may be raised in confidence when that is appropriate; 
•  the rights of employees who are the subject of disclosures; 
•  any obligations placed on an employee in terms of bearing witness; 
•  the interest of the Council; 
•  the right to raise matters of concern and not be subject to any detriment; and 
•  the protection which is available to an employee. 
1.2 The disclosure of information in the public interest involves the reporting of serious
concerns about illegal or unethical conduct or behaviour which could be described as
serious malpractice in the workplace. The kinds of concerns are those set out at paragraph
2.2 of this procedure. 
1.3  The principles and guidance outlined in this procedure have been developed  against the 
background of the Council’s wish to be open and honest, to encourage high standards of 
conduct in the workplace and to develop the statutory protections available to employees. 
1.4     Any employee who has a concern over what they consider is serious wrongdoing within
the Council may wish to seek support and advice from their trade union which may be in
a position to assist the employee in preparing and making a disclosure report under this
procedure. 
1.5      The title given to this procedure is Public Interest Disclosures. It may also be referred to as
the “Whistleblowing” Procedure. 
Page 147 of 166

Page 148

Whistleblowing  5 
2. Reporting Concerns 
2.1   Most personal concerns at work can be adequately dealt with using other procedures or
mechanisms. For instance, if there is an issue about your working conditions which you
cannot resolve through other means, you may wish to use the Council’s Grievance
Procedure. The procedure outlined in this document is designed to deal with issues of
illegality or serious malpractice. 
2.2    The public has a right to expect high standards of service. However, there may be
occasions when, due to individual acts, omissions or failings, it may be necessary to bring
certain matters which give cause for serious concern to the attention of your employer. If
you are concerned about an aspect of individual behaviour or Council practice it may fall
under one (or more) of the following categories: 
•  a criminal offence; 
•  a failure to comply with a legal obligation; 
•  a miscarriage of justice; 
•  danger to the health and safety of an individual; 
•  damage to the environment, and 
•  the deliberate concealment of information tending to show any of the matters
above is being deliberately concealed. 
2.3    Under the terms of this procedure an employee can report a matter which they reasonably
believe to be in the public interest, on a confidential basis to their employer regarding any
of these six categories. The categories are by no means mutually exclusive. For instance,
you may be aware of a health and safety failure that is also a criminal offence. If you are
not sure whether the concern you wish to raise falls into one of the above categories then
you may contact one of several Council Officers who will try to assist you in identifying
whether the concern which you have falls under one or more of these categories or
whether your concern should be better dealt with under a different procedure or route.
The officers available to advise on this are the Council’s Chief Officer (Legal and
Democratic), Chief Officer (Finance) and Chief Officer (People Resources). 
2.4  An employee may also be a resident in the Council’s area or have other good  reason to 
approach a local councillor. Such an employee is free to raise an issue with their 
councillor. However, advising a local councillor of a concern over serious wrongdoing is 
not a substitute for advising the Council formally by following the Disclosure Report 
Procedure set out in Section 4. The onus rests on the employee to make the Public 
Interest Disclosure by following the defined reporting procedure. This will ensure that the 
Council deals with the matter formally, and in terms of both the legislation and this 
Procedure. 
3. Confidentiality and Anonymity 
3.1 One of the principles of this procedure is that an employee has the right to report a matter
they consider to be in the public interest and the report will be treated on a confidential
basis. For the reporting process to have credibility, employees must have confidence that
any matter they draw to the attention of their employer will be handled with discretion
and tact. 
Page 148 of 166

Page 149

Whistleblowing  6 
3.2 The Council hopes that all staff will be able to voice whistleblowing concerns openly under
this policy.  If an employee wishes to raise their concern confidentially, the Council will
make every effort to ensure the employee’s identity is kept a secret.  If it is necessary for
anyone investigating the employee’s concern to know their identity, this will be discussed
with the employee. 
3.3 The Council does not encourage staff to make disclosures anonymously.  Proper
investigations may be more difficult or impossible if the Council cannot obtain further
information.  It is also more difficult to establish whether any allegations are credible. 
Whistleblowers who are concerned about possible reprisals if their identity is revealed
should come forward to the officers identified at 2.3 and appropriate measures can then
be taken to preserve confidentiality.  If an employee is any doubt, they can seek advice
from Protect (https://protect-advice.org.uk/), the independent whistleblowing charity, who
offer a confidential helpline.   
3.4 It has to be recognised, however, that in some cases it may not always be possible to
preserve total confidentiality, for instance, if the matter reported has to involve agencies
such as the police or the Health and Safety Executive. If, in such a situation, the Council
can no longer preserve total confidentiality, the employee will be advised of that fact. 
4. Reporting Procedure 
4.1  An employee wishing to report a matter that is covered by the categories covered in this 
procedure should contact the appropriate designated officer in the employing Service in 
the Council. The designated officers are those identified in Annex 1 to this document. 
This report should, preferably, be in writing and in order to avoid any doubt, should be 
described as a “Public Interest Disclosure”. 
4.2  This procedure requires that disclosure reports should be made to the designated officers. 
Those designated offers are required to be alert to such disclosures and ensure that, as 
far as it is possible, the confidentiality of such reports is maintained.  This will normally 
involve the report having the personal attention of the designated officer. 
4.3 If a disclosure report is made which alleges wrongdoing by the Depute Chief Executive or
Chief Officer that report should be made directly to the Chief Executive. 
4.4  Once a report has been submitted the appropriate officer will advise you of the next steps
and any expected timescale.  This will be done within five working days. 
4.5  At this stage of the process it is important that confidentiality is maintained by both parties
where that is required to ensure that the matter can be dealt with in the appropriate way,
avoid prejudice and protect individual rights. 
4.6  The report will then be considered and a decision taken as to whether, and in what way,
the matter should proceed. 
4.7  Should the appropriate officer decide not to take any action you will be notified and given
the reason(s) for this decision. 
Page 149 of 166

Page 150

Whistleblowing  7
4.8  If the appropriate officer decides that further action is required on the basis of your report,
then you will be notified of the decision, subject to the appropriate investigation and the
likely timescale, if possible, to do so. 
4.9 Once the matter has been concluded and the appropriate action taken in response to your
report, you will be notified of the outcome.  However, sometimes the need for
confidentiality may prevent the Council from giving you specific details or any disciplinary
action taken as a result.  You should treat any information about the investigation as
confidential.  
4.10  Under the terms of this procedure, you may seek a progress update from the appropriate
officer regarding the status of your report, although it has to be understood that the
response may have to be qualified in order to protect other interests. 
4.11  While the Council cannot guarantee the outcome you are seeking, the Council will try to
deal with your concern fairly and in an appropriate way.  By using this procedure, you can
help the Council achieve this.   
4.12  If you are not satisfied with the way your report has been dealt with, you can raise this with
the Chief Executive.
5. Safeguards 
5.1  Under the terms of this procedure, any employee making a Public Interest Disclosure
report is safeguarded against any detriment in the course of their employment, provided
that the report is made in the reasonable belief that it is in the public interest. 
5.2  For the purpose of this procedure, detriment is defined as any act or omission that
penalises the employee for submitting the report. For example, dismissal, harassment,
victimisation or any other form of punitive sanction which would not have arisen were it
not for the report having been made are prohibited under the terms of this procedure.  If
you believe that you have been subjected to a detriment, you should immediately report
that to the officer who received your disclosure report.  If the matter is not remedied, you
should raise it formally through the Council’s Dignity at Work procedure. 
5.3 An employee must not threaten or retaliate against another employee making a Public
Interest Disclosure Report.  Any employee involved in such conduct, may be subject to the
Councils’ disciplinary procedure.  In addition, if an employee is subjected to such detriment
by another employee then that other employee could be personally liable.
6. Wrong Reports 
6.1  There may be instances when a report is submitted, based on a genuine belief by the
employee that something is wrong at a particular time, which is subsequently
demonstrated to be false or inaccurate. In such circumstances, employees will be informed
of the discrepancy between their report and the facts at hand. Provided that the Council is
satisfied that the employee acted in good faith and had a genuine belief that such a
situation should be reported and no personal gain was involved, no further action will be
taken against the reporting employee. 
Page 150 of 166

Page 151

Whistleblowing  8
6.2  If an employee has deliberately submitted a report that they know to be not true or
unfounded or with a view to personal gain then they may be subject to the Council’s
disciplinary procedure. 
7. Reporting Outwith the Council 
7.1  The aim of this procedure is to provide an internal mechanism for reporting, investigating
and remedying any wrongdoing in the workplace. In most cases you should not find it
necessary to alert anyone externally. 
7.2  The law recognises that in some circumstances it may be appropriate for you to report
your concerns to an external body such as a regulator. It will very rarely if ever be
appropriate to alert the media. You are strongly encouraged to seek advice before
reporting a concern to anyone external.  Protect’s confidential helpline is available for this.
In addition, Protect has a list of prescribed regulators for reporting certain types of
concern. 
7.3 Whistleblowing concerns usually relate to the conduct of our staff, but they may
sometimes relate to the actions of a third party, such as a supplier or service provider.  In
some circumstances the law will protect you if you raise the matter with the third party
directly. However, you are encouraged to report such concerns internally first. You should
contact one of the other key contacts set out in paragraph 2.3 for guidance. 
7.4 Employees within Health and Social Care can access the National Whistleblowing
Standards in relation to NHS Services.  Further information can be obtained from the Chief
Accountable Officer or accessed here. 
Page 151 of 166

Page 152

Whistleblowing  9
ANNEX 1 
CHIEF OFFICERS TO WHOM PUBLIC INTEREST DISCLOSURES MAY BE REPORTED – 
WHISTLEBLOWING PROCEDURE 
1. Chief Executive’s Service   Des Murray
Chief Executive 
2. Enterprise and Communities Service Andrew McPherson
Depute Chief Executive 
3. Education and Families Service  Gerard McLaughlin
Chief Officer (Education – North) 
4. Adult Health and Social Care Services Ross McGuffie
Chief Officer (Health and Social Care) 
Page 152 of 166

Page 153

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  AA/ Date 06/06/24 
Code of Conduct for Chief Officers 
From  Archie Aitken, Chief Officer (Legal & Democratic) 
Email aitkena@northlan.gov.uk Telephone 07939 280 102 
Executive Summary
This report seeks approval of the updated and revised Code of Conduct for Chief Officers
(“the Code”). 
Recommendations
It is recommended that the Policy and Strategy Committee:  
(1) Approves the revised Code of Conduct for Chief Officers.  
The Plan for North Lanarkshire
Priority  Enhance participation, capacity, and empowerment across our
communities
Ambition statement (24) Review and design services around people, communities, and
shared resources
Programme of
Work Statutory/corporate/service requirement
Item 11
Page 153 of 166

Page 154

1. Background 
1.1 The Code of Conduct for Chief Officers, attached as an appendix to this report provides
a framework within which the Chief Officers of the Council are expected to undertake
their duties and responsibilities in a manner which meets the required standards for
good governance. 
2. Report 
2.1 Recognising that most enquiries received from MPs and MSPs relate to more complex
matters which, in some cases, have been escalated from elsewhere, it is proposed that
written responses to such enquiries be made within a period of no more than 20 working
days. 
2.2 Accordingly, it is proposed that the following sentence be added at the end of paragraph
7.5 of the Code:- “Notwithstanding the general rule set out in paragraph 7.3 above,
written responses to all MP and MSP enquiries must be provided no later than 20
working days from the date of receipt of the enquiry.”    For ease of reference, this has
been added in bold to the appendix. 
3. Measures of success 
3.1  Implementation of the revised Code of Conduct for Chief Officers will assist the Council
in meeting the high standards of good governance.     
4. Supporting documentation 
Appendix – Code of Conduct for Chief Officers. 
Archie Aitken
Chief Officer (Legal & Democratic) 
Page 154 of 166

Page 155

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 155 of 166

Page 156

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or scheduled) by the Enterprise Architecture
Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 156 of 166

Page 157

1 
Appendix
NORTH LANARKSHIRE COUNCIL
CODE OF CONDUCT FOR CHIEF OFFICERS 
Introduction 
The provisions of this Code apply to all Chief Officers of the Council, including the Chief
Executive, Depute Chief Executive and Chief Accountable Officer. 
As Chief Officers of the Council you are already subject to certain rules and obligations such
as those defined by law or prescribed in your Conditions of Employment, the Council's
Standing Orders, Financial Regulations and Contract Standing Orders. You may also be
subject to certain obligations of a professional organisation to which you belong as a necessary
or appropriate part of your employment.  
This Code is not intended in any way as a substitute for such rules or obligations but rather to
supplement them. The Code is prescribed for the purposes of guidance but should not be
departed from without good reason, which you may be called upon to justify. In particular any
breach of this Code may be taken into account in any disciplinary or other proceedings or in
any mechanism by which your performance as a Chief Officer may be assessed for any
purpose. 
Although this Code is designed primarily for Chief Officers, there is an expectation that those
officers who regularly attend meetings of the Business and Corporate Management Teams will
also comply with it. 
1.  Corporate Working 
1.1  All Chief Officers are expected to work together in the best interests of the Council. 
This means that Services should not be seen as independent, autonomous 
organisations. While a Chief Officer will have an operational responsibility for the 
management of their Service, the work and role of the Service must be set within the 
corporate context of the Council's objectives and policies.  
1.2  The principal strategic focus for corporate working is The Plan for North Lanarkshire. 
Corporate management is concerned primarily with issues of strategic importance. All 
major policy issues will therefore require to be reviewed from a corporate standpoint to 
allow an assessment to be made of their strategic significance.  
1.3  In the interests of corporate working all major policy issues or projects and matters 
requiring corporate attention must be brought to the attention of the Chief Executive at 
the earliest possible opportunity for his consideration and any advice as to  how such 
issues should be dealt with. Chief Officers should not attempt to put strategic policy 
issues through the Committee system by direct approach to a Committee Convener or 
a Member Level Forum before such issues have been brought to the attention of the 
Chief Executive and consideration given as to the appropriate approach to the 
matter. 
1.4  The principal operational focus for corporate working by Chief Officers is the Corporate 
Management and Business Management Teams at which any inter-Service difficulties 
should be aired and potential issues anticipated. Attendance at these meetings, as
Page 157 of 166

Page 158

2 
required, must be regarded as being as important as attendance at Council or 
Committee meetings. Except as authorised by the Chief Executive, Chief Officers must 
attend these meetings, as required, other than due to illness, leave or other approved 
absence, in which cases a member of the Service Senior Management Team will attend 
in the absence of the Chief Officer. 
1.5  All Chief Officers are also expected to participate fully in the community planning 
process under the North Lanarkshire Partnership Strategic Leadership Board and its 
supporting community planning structures. 
2.  Relationships with Councillors  
2.1  Councillors should be afforded the respect of their office. They should be addressed as 
Provost, Convener, Chair or Councillor as appropriate although it is accepted that on a 
one-to-one basis in private other forms of address may be used depending on how 
long and how well the Chief Officer and Councillor have known each other. It is the 
responsibility of all Chief Officers to convey the concept of respect for the elected 
office of Councillor among Council staff. 
2.2 Mutual respect between Councillors and Officers is essential to the proper conduct of 
the Council. Close personal familiarity between individual Chief Officers and 
Councillors can damage both this relationship and the belief that Chief Officers give 
objective and professional advice and commitment to the Council. 
3.  Relationships with Committee Conveners  
3.1  Chief Officers are responsible for the management of Services and the provision of 
professional advice to the Chief Executive and to the whole Council.  Formal advice is 
normally given at committee and is most often in written report form. 
3.2  Committee Conveners are responsible for chairing committees and act as Council 
spokespersons for particular Services. They will normally be members of the Council 
Administration and will be seeking to ensure that Chief Officers are taking account of 
the political priorities of the Administration, often expressed as manifesto 
commitments, and considering any controversial issues before they become public. 
They have to report back to their political group and will often recommend ideas to the 
group, and group proposals to Chief Officers. In this respect it is important to ensure 
that a Convener is properly briefed on subjects or issues concerning which they may 
be asked to speak, whether to their political group, a section of the media or, most 
importantly, a Committee or the Council. 
3.3  Chief Officers must not take instructions from Conveners, as their instructions come 
from the Council as a whole and from the Chief Executive. Chief Officers should keep 
Conveners appraised of matters of significance likely to affect their Service or the 
functions of their Service Committee, from impending legislation through to local 
concerns being raised by local groups, MPs or MSPs. From time to time a Convener 
may request a background note or policy options paper. These should be seen as 
extensions of the normal briefing provided to Conveners and assistance given for that 
purpose, although care should be taken to ensure that Service resources are not 
committed to an undue extent in the preparation of such documents.  
3.4  The relationship between a Chief Officer and Convener is one which develops with 
time and should be based on mutual respect and understanding of the roles and
Page 158 of 166

Page 159

3 
contributions of each to the work of the Council. Differences of view will occur, but this 
is only to be expected from time to time. If differences are regular and persistent, the 
Chief Officer should consult the Chief Executive.  
3.5  The Chief Executive should be advised when Conveners are seeking inter-Service 
meetings with other Conveners and their Chief Officers, in case any policy or 
management difficulties are being encountered, and to ensure the  Leader of the 
Council is made aware of any new initiatives or issues. 
4.  Attendance at Political Party Group Meetings  
4.1  Taking account of the guidance contained in the Protocol for Relations between 
Councillors and Employees in Annex A to the Councillors’ Code of Conduct it can 
sometimes be of benefit for a Chief Officer to attend meetings of political groups to give 
advice on a particular issue, but these occasions should be seen as the exception rather 
than the  rule. Requests for such attendance should be made to the Chief Executive by 
the appropriate political group Leader or Secretary/Business Manager.  
4.2  Officers may attend meetings of political groups to give background or briefing 
information on committee items or matters of current concern but may only do so when 
such attendance has been sanctioned by the Chief Executive. The Chief Executive 
may decide that attendance is inappropriate or that attendance by himself, the 
Depute Chief Executive and/or a Chief Officer is appropriate and may request that a 
Chief Officer attend such a meeting.  Following the agreement of the Chief Executive, a 
Chief Officer may decline a request from a political group to attend in person or may 
request that an appropriate member of staff attend. 
4.3 In keeping with the concept that professional advice from Chief Officers should be 
available to all political parties represented on the Council, the Chief Executive will 
keep a record of all requests for the attendance of Officers at political group meetings 
and the outcome of such requests and such records will be available for inspection by 
the Secretary/Business Manager of the political groups. 
5.  Public or Professional Meetings  
5.1  Unless carrying out a general or specific instruction from the Council or the Chief 
Executive, Chief Officers should not accept invitations to address Community 
Councils, Tenants' Associations or other forms of public meetings without first advising 
the Convener responsible. Where the subject matter is particular to an individual area 
or Ward it would also be appropriate to advise the local Ward Members. 
5.2  Where the invitation concerns addressing a meeting of professional officers or similar 
gathering concerned with your professional duty, such activities will generally be 
encouraged. 
6.  Statements to the Media  
6.1  Where Council procedures so require, all statements to the media must be made by an 
officer designated for this purpose or by way of the Council's Chief Officer responsible 
for media relations. In other respects it is the responsibility of each Chief Officer to 
ensure that Council policy and procedures for dealing with the media are complied with.  
Page 159 of 166

Page 160

4 
6.2  Chief Officers should not agree to appear on the broadcast media such as television 
programmes without first notifying the Chief Officer (Strategic Communication and 
Engagement).  
6.3  Any questions of controversy or which involve departure from Council policy should be 
the subject of consultation with the Chief Executive prior to any comment to the media 
being made. 
6.4  In all cases where Council procedures so require, reference should be made to the 
Chief Officer (Strategic Communication and Engagement) who may advise on lines of 
approach or comment. 
6.5  It is the responsibility of each Chief Officer to identify whether any potential legal issue 
may be involved in comment to the media and to seek advice from the Chief Officer 
(Legal & Democratic) as appropriate. 
7.  Written Communications  
7.1  Written communications, whether to Councillors, other Officers or to organisations or 
individuals having business with the Council, represent the most important means of 
communication. If a person writes to a Service or the Council they should receive a 
prompt, courteous and coherent reply. It is impossible to satisfy all senders of 
correspondence, but Chief Officers should make themselves and their staff aware of
the importance of written communication.  
7.2  Chief Officers are responsible for ensuring that incoming mail addressed to the Service 
is examined at an appropriate level and that they are familiar with significant issues 
being raised in correspondence.  Correspondence should be addressed to Chief Officers 
who are responsible for ensuring that there are adequate arrangements for mail to be 
satisfactorily dealt with.  Staff should be made aware of the fact that all mail is to be 
examined so that they can ensure that no personal or private mail is addressed to 
them at their work place.  
7.3  As a general rule, if it is not possible to provide a full response to a written enquiry 
within two weeks, arrangements must be made to ensure that at least an interim 
response is made. In the case of written enquiries by Councillors a response should be 
provided within five working days, and reference is made to the “Procedure for 
Dealing with Enquiries from Elected Members” which is appended to this Code.  If a 
request by a Councillor would result in significant Council resources being used for 
the purposes of complying with the request, the request should be discussed with the 
Chief Executive. 
7.4  Chief Officers are responsible for ensuring that outgoing mail is signed at an 
appropriate level within their Service, recognising that important correspondence may 
require their personal attention. 
7.5  Correspondence to Councillors, MPs, and MSPs should be signed by a Chief Officer or 
a member of their senior management team, it is accepted that, because of the volume 
of requests, waiting list positions, etc may be supplied directly to elected members by 
Area Managers in the Housing Service and obviously some straight-forward requests 
for information would be dealt with by senior managers. However, it is important that 
Chief Officers are aware of correspondence received from elected members and Chief 
Officers should keep some convenient record of enquiries received from Councillors, 
MSPs and MPs.  Notwithstanding the general rule set out in paragraph 7.3 above,
Page 160 of 166

Page 161

5 
written responses to all MP and MSP enquiries must be provided no later than 20 
working days from the date of receipt of the enquiry. 
7.6  The Chief Executive will normally receive correspondence from MSPs, and MPs and 
may ask Chief Officers for information to inform his response or to arrange for a reply to 
be sent on his behalf. All correspondence with MSPs, and MPs and must be copied 
to the Chief Executive for his information. 
7.7  Most written correspondence, both within and outwith the Council, is undertaken by 
email, which raises issues as to the authority of staff to represent or commit the Council. 
Chief Officers are responsible for ensuring that staff conform to appropriate Service 
guidelines on the use of email, including keeping more senior officers advised and 
copied in, against the background of any Council-wide procedures and protocol. 
8.  Committee Reports and Agenda Items  
8.1  All reports to Committees, Sub-Committees or similar bodies shall be in name of a 
Chief Officer. Such reports are understood to represent the proper professional opinion 
and advice of the Chief Officer of the appropriate Service. 
8.2  Elected members may in Committee or Council ask for reports to be prepared but the 
preparation of reports shall generally be the sole province of officers. Chief  Officers 
may submit reports on new items of business as they consider appropriate, within the 
context of corporate working as outlined above. 
8.3  All items for inclusion on an agenda should be with Democratic Services not later than 
noon on the day determined in accordance with the timetable fixed by the Chief 
Officer (Legal & Democratic) for that purpose. 
8.4  In accordance with the spirit of corporate working, the preparation of reports should 
take cognisance of the fact that other Services, require to be consulted on matters 
which affect them. Similarly, reports require to be prepared taking into account 
appropriate legal, financial, human resources, property, technical and other advice as 
required. The system of Conveners meetings is no substitute for prior 
consultation. 
8.5  If any report criticises another Service such a report should be the subject of specific 
consultation between the Chief Officers concerned and the Chief Executive prior to its 
inclusion on any agenda. 
8.6  An agenda for any Committee, Council or similar member level meeting shall be 
prepared by the Chief Officer (Legal & Democratic) in consultation as necessary with 
the Chief Officers of the appropriate Services. If the Convener so requires, this shall be 
discussed with the Convener of the appropriate Committee at an agenda meeting. A 
Chief Officer will have the right to submit a report for inclusion on an agenda on an  item 
which they feel requires a professional submission by them at that time. The 
Convener may instruct that an item be added to the agenda or that any item not be 
placed on the agenda at this time. Where a report put forward by a Chief Officer has 
not reached the agenda proper after a reasonable period of time, or earlier where 
there is considered to be some urgency, this should be taken up with the Chief 
Executive. No item may be removed if it was remitted or continued to the particular 
meeting being called or if it is an item requested to be placed on the agenda by an 
elected member in terms of Standing Orders. Similarly, the removal of an item from an 
agenda must be based on a Council decision to that effect. Subject to the above points
Page 161 of 166

Page 162

6 
the composition of the agenda and the addition or removal of any items shall be at the 
discretion of the Chief Officer (Legal & Democratic).  
8.7  While Officers' reports, including recommendations, must be submitted as written to 
the appropriate Committee or the Council, the Convener has the right, if they
wish to exercise it, to make a different recommendation to their Committee or 
Council Meeting. 
8.8  Where for any reason there is no Convener or Vice Convener of a particular 
committee, a draft agenda shall still be produced at the usual time. This will be subject
to consideration by the Chief Executive who will discuss it with the Chief Officer (Legal 
& Democratic) and such other officer as he thinks fit and give instructions to the 
Chief Officer (Legal & Democratic) as to any items which should or should not be 
placed on the agenda and any other instructions he considers appropriate. 
9.  Financial Regulations and Contract Standing Orders  
9.1  It is the duty of a Chief Officer that at least once a year you should read the council's 
Financial Regulations and Contract Standing Orders and ensure that at all times staff 
under their supervision are aware of the detailed requirements of these orders and 
regulations insofar as they relate to the duties being performed.  
9.2 Chief Officers are required to ensure that all senior management and all officers who 
are designated as authorised signatories for the approval of  expenditure on any goods 
or services, or commitment on the part of the Council to any contractual obligations, 
familiarise themselves with the Financial Regulations and Contract Standing Orders 
within two weeks of joining the Service, and thereafter with such amendments as may 
be issued. 
9.3  Chief Officers are further required to ensure that all those abovementioned members 
of staff in their Service read these documents and return an acknowledgement form to 
that effect when required. 
9.4  Chief Officers should ensure that all goods and services are purchased in accordance 
with the appropriate Regulations and should source services from the appropriate part 
of the Council charged with the provision of such services. 
10. Budgets  
10.1  Chief Officers will be held accountable for expenditure on revenue and capital budgets  
under their control. 
10.2  Chief Officers must go over their revenue and capital budgets at least once each 
accounting period to check progress.  Significant deviations from budget must be 
reported in accordance with the requirements of the Financial Regulations, and 
appropriate conveners advised accordingly. 
11.   Delegated Powers  
11.1  Chief Officers should ensure that they comply with the terms of any powers delegated to
them and that staff under their control do likewise. 
Page 162 of 166

Page 163

7 
11.2  Chief Officers should review from time to time the nature, scope and need for delegation. 
12.   Leave, Sickness or Other Absence  
12.1  The Council’s scheme for notification by staff to their supervising officers of unavoidable
absence from work due to sickness, and the arrangements for taking annual leave apply
equally to Chief Officers, subject to the requirement that in the case of those Chief
Officers who report directly to the Chief Executive the appropriate supervising Officer to
whom notification of absence should be intimated and permission for leave sought is the
Chief Executive, who should also be updated on any significant periods of absence.  
12.2  In addition to absence arrangements due to sickness or leave, any Chief Officer who
wishes to be absent from there office on business outwith the UK shall first seek the
agreement of the Chief Executive. Chief Officers should also seek the agreement of the
Chief Executive prior to approving attendance at conferences or business outwith the
UK by any other member of their Service. 
12.3  Chief Officers should not be on leave at the same time as their Senior Management
Team and this cover arrangement applies also to absence from the office due to
attendance at conference, courses, etc.  
12.4  Chief Officers are responsible for ensuring that adequate arrangements are made for
proper continuance of the work of their Service in determining arrangements for staff
leave. Pre-planning of arrangements for leave requests at popular periods such as peak
holiday periods and at Christmas/New Year is essential to ensure that the proper
functioning of the Service is maintained. 
13.   Police Enquiries 
13.1  Chief Officers must inform the Chief Executive immediately of any police involvement
outwith routine contacts in any activity affecting your Service or involvement with any
current or former member of your staff. Chief Officers must similarly advise the Chief
Executive immediately of any irregularity affecting their Service which may involve the
commission of any criminal act.   
13.2 In terms of arrangements put in place by the Chief Constable, Police Scotland,
concerning bribery, corruption, defalcation, embezzlement, and fraud reporting
procedures, such reports shall be made to the Police by the Chief Executive or on his
authority.   Where appropriate, Chief Officers should refer to the Council’s Counter-Fraud
Policy which sets out the detail how the Chief Officers should deal with any such matters
including referral of relevant issues with the Chief Officer (Audit and Risk) for
consideration, advice and possible internal investigation. 
14.   Council Decisions 
14.1  Notwithstanding any arrangement whereby the Chief Officer (Legal & Democratic)
advises Services of Council decisions, it is the responsibility of each Chief Officer to read
Council Minutes and to take all necessary steps to implement Council decisions. 
15.   Safety Policies & Procedures 
Page 163 of 166

Page 164

8 
15.1  Each Chief Officer is responsible for ensuring that the working practices in their Service
conform with all legislative requirements and this requirement similarly affects sites or
contracts under their control. Chief Officers must arrange for the production and review
of appropriate Safety Policies and Procedures and ensure that these are brought to the
attention of staff and others under their supervision.  
This obligation involves the undertaking of risk assessment as appropriate.    
16.   Confidentiality 
16.1  Chief Officers will, of necessity, come across much information dealing with a wide range
of material, some of which may be confidential but most of which may be of a routine
nature. While ensuring at all times that the requirements of legislation such as the
Freedom of Information and Access to Information regimes are complied with, it is
important that information on Council business is restricted to those who have legitimate
business to know it. Accordingly, care should be taken to ensure that Council business
is not divulged without legitimate reason. 
17.   Potential Conflicts of Interest 
17.1  Conflicts of Interest occur where there is a divergence between your responsibilities to
the Council as a Chief Officer and your personal interests, which will also include those
of family members and friends/acquaintance. These could include financial interests in
respect of an individual or organisation undertaking business with the Council, the
recruitment by the Council of a family member or friend/acquaintance or your
engagement in employment or other work out with the Council.  It is your responsibility
as a Chief Officer to maintain your Register of Interests and to ensure that this is updated
on at least an annual basis and, otherwise, within one month of any change occurring,
and to notify the Chief Executive, in writing, of any matter arising which amounts to a
conflict of interest. 
17.2 Your attention is drawn to the statutory requirement that if it comes to a Chief Officer’s
knowledge that a contract in which they have a pecuniary interest, whether direct or
indirect, (not being a contract to which they themselves are a party) has been or is
proposed to be entered into by the Council, then the Council, through the Chief
Executive, must be advised of their interest immediately and in writing.  In addition, the
attention of Chief Officers is drawn to the statutory requirement that an Officer shall not,
under colour of their office or employment, accept any fee or reward whatsoever other
than their proper remuneration nor should they use their position with the Council for
personal gain. 
17.3 Chief Officers will not undertake any other employment or outside or private work
whether for payment or reward or otherwise, except with the prior consent of the Council,
which consent shall not be unreasonably withheld providing always, however, that:- 
(i)  such consent shall not normally be given for work that is in any way associated 
with official duties, and 
(ii)  Chief Officers shall not engage in work for any individual, firm or body where the  
Council is, or could be, involved in the transaction or other business or where the  
work in any way conflicts or is likely to conflict with or impinge upon the Council's  
interest. 
17.4 If any other circumstances come to a Chief Officer’s attention whereby a conflict of
interest may arise in relation to the performance of their duties with the Council it is their
Page 164 of 166

Page 165

9 
responsibility to notify the Chief Executive accordingly and to make appropriate
arrangements to avoid that conflict of interest. 
17.5 Failure to comply with these obligations, as set out above, may result in disciplinary
action and/or legal action being taken if deemed appropriate. 
18.   Staff Recruitment, Training and Development 
18.1  The principal resource of the Council is its staff. As a professional and as a manager,
Chief Officers have a responsibility to ensure that the practices followed in their Service
in relation to recruitment conform to statutory and Council requirements and that proper
arrangements exist for training and staff development. Particular attention should be paid
to Council policies, including Equality and Diversity policies.  Reference is also made to
the obligations set out in Section 17 above with regard to the recruitment of family
members or friends/acquaintances and the duty to notify the Chief Executive accordingly. 
19.   Conduct and Example 
19.1  Chief Officers should at all times conduct themselves in a manner befitting that post and
seek to uphold the good name and reputation of North Lanarkshire Council. 
19.2  Chief Officers have a particular responsibility in terms of conduct and example for their
staff. Chief Officers cannot expect commitment or enthusiasm from staff unless they
show, by example, proper standards of conduct and diligence. This applies across the
board to issues such as loyalty to the Council, commitment to achieving Council policy
(including work outwith normal office hours as required from time to time), timekeeping,
appearance and leadership.  
19.3  Chief Officers should treat with extreme caution any offer of gift, favour or hospitality
which is made to them. It is difficult to make definitive rules about hospitality or tokens of
goodwill. For example, a working lunch may be a proper way of doing business provided
that no extravagance is involved. As a general guide it is safer to refuse offers except (a)
isolated gifts of a trivial character or inexpensive seasonal gifts, such as a calendar, diary
or other simple items of office equipment of modest value, or (b) normal hospitality
directly associated with a Chief Officer’s duties and which a Chief Officer would not be
embarrassed for others to be aware of. Chief Officers are personally responsible for all
decisions connected with the acceptance of the offer of gifts or hospitality and for
avoiding the risk of damage to public confidence in them or the Council. Each Chief
Officer also has responsibility for maintaining a register of gifts and hospitality which
should be updated with the relevant details of any offers which are offered and whether
or not accepted by employees in their Service. Chief Officers require to advise every
employee in terms of the Employee Code of Conduct, to report details of any offer of
gifts or hospitality received for the purpose of the register with the exceptions of those
described at (a) and (b) above. Employees should be made aware of the fact that their
decisions on these issues may be subject to scrutiny and justification. 
Des Murray 
Chief Executive
Revised – May 2023 
Page 165 of 166

Page 166

10 
Procedure for Dealing with enquiries from Elected Members 
1. What is an enquiry?
Enquiries can relate to a request for service or information, or they may seek clarification of
circumstances for a particular situation, constituent, or ward. Enquiries can be made in person, by
phone, by letter, or through email to officers across the council.
2. What to do when a service receives an enquiry
Co-ordinating arrangements and recording systems differ in each service, but services should ensure
each enquiry is logged on receipt. 
3. Response timescales
Services should ensure Elected Members receive a full response within 5 working days following
receipt of the enquiry. The timescale clock starts on the first full working day after receipt, i.e. this
counts as day one.
If the enquiry will take more than 5 working days to investigate, the service must issue a holding
response (within the initial 5 working day period). Provide an update on the status of the enquiry and
the new expected response date.
4. What to do when the Chief Executive or a Chief Officer receives an enquiry
If an Elected Member makes a verbal enquiry, the Executive Support will record the details on the
enquiry form and forward to the relevant officer identified in the Service Directory.
If an Elected Member makes an enquiry by email, the Executive Support will forward the email to the
officer identified in the Service Directory and acknowledge the Elected Member’s email. Refer below: 
Acknowledgement Text
Thank you for your enquiry regarding the above named subject. In accordance with agreed
protocols, this enquiry has been forwarded to [name of relevant service]. This will ensure your
enquiry is properly recorded and a formal record kept. 
You will receive a response to your enquiry no later than five working days from receipt of your
enquiry. I have attached a copy of the protocol for your information. 
Your co-operation and understanding in adhering to these arrangements would be very much
appreciated so that enquiries can be dealt with as efficiently as possible. 
Page 166 of 166