Democracy Spraffa

Agenda Document Pack - Policy and Strategy Committee - 14/03/2024

North Lanarkshire Council · 14 March 2024
Back to Policy and Strategy Committee — 14 March 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

5 March 2024 
Members of the 
Policy and Strategy Committee
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Policy and Strategy Committee is to be held in the
Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Thursday, 14
March 2024 at 14:00 PM which you are requested to attend. 
The agenda of business is attached. 
Archie Aitken
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Lesley Dysart
Clerk Telephone:
Clerk Email: dysartl@northlan.gov.uk
J Logue, L Roarty, C Barclay, A Beveridge, H Brannan-McVey, A Campbell, T Carragher, C
Costello, P Di Mascio, K Duffy, T Fisher, D Johnston, K Larson, J Leckie, G Lennon, H
Loughran, A Masterton, M McBride, L Nolan, G Robinson, A Smith, K Stevenson, A Stubbs,
S Watson, G Woods.  
Page 1 of 326

Page 2

Page 2 of 326

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000   
2 Minute of Audit and Scrutiny Panel of 20 November
2023
Submit Minute of Audit and Scrutiny Panel of 20
November 2024 
7 - 12 
3 Presentation - The Plan for North Lanarkshire -
Programme of Work to 2028   
4 Strategic Capital Investment Programme 2024/25 to
2028/29
Submit report by the Depute Chief Executive seeking
approval of the development of the Council’s Strategic
Capital Investment Programme for the 5-year period
from 2024/25 to 2028/29 
13 - 52 
5 Programme of Work - Achievements to date
Submit report by the Chief Executive informing (1) of
the key role that the Committee plays in ensuring the
continuing commitment to delivering The Plan for North
Lanarkshire through the Programme of Work, and
ensuring strategic oversight in terms of its ongoing
development, co-ordination, and monitoring, and (2) of
the achievements which have been delivered through
the Programme of Work to date as set out in Appendix
2 of the report 
53 - 74 
6 Strategic Performance Framework - the North
Lanarkshire context
Submit report by the Chief Officer (Business and
Digital) advising (1) of the key role that the Health
Check Indicators play in providing the place-based
evidence base from which progress in delivering The
Plan for North Lanarkshire can be assessed, and (2) of
the latest results, as set out in Appendix 1 of the report,
and the successes and challenges summarised in
paragraphs 2.4 and 2.5 of the report respectively 
75 - 104
Page 3 of 326

Page 4

7  The Plan for North Lanarkshire - Delivering the
Programme of Work to 2028
Submit report by the Chief Executive (1) advising of the
commitment to establish a single integrated Council
wide delivery plan to support implementation of the
Programme of Work to 2028 had been fulfilled; (2)
providing details of the indicative reporting schedule
set out in Appendix 3 of the report, to ensure ongoing
Elected Member consideration and approval of the next
phase of delivery for the wide range of programmes,
projects, and activities in the Programme of Work to
2028, and (3) seeking approval of the next steps to
ensure the Committee continues to play a key role in
the delivery of The Plan for North Lanarkshire by
ensuring strategic oversight and monitoring of its
ongoing development, co-ordination, and delivery 
105 - 150 
8 Transforming Places - St Kevins Community Hub
Contract Award
Submit report by the Chief Officer (Assets and
Procurement) (1) providing information on the status of
the contract pricing and commercial activities for St
Kevin's Community Hub, and (2) seeking approval to
progress to Contract Award for the project 
151 - 156 
9 UK Shared Prosperity Fund - Annual Update
Submit report by the Chief Officer (Place) informing of
progress that has been made with the delivery of the
Shared Prosperity Delivery Plan over the course of
2023/24 
157 - 170 
10  Findings of Internal Audit of Council Approach to
Climate Change
Submit report by the Depute Chief Executive (1)
providing details of the findings of the most recent
internal audit into climate change, and (2) highlighting
the actions already underway to address the findings 
171 - 188 
11  Strategic Policy Framework - Annual Review and
Refresh
Submit report by the Chief Officer (Business and
Digital) seeking approval of the Strategic Policy
Framework attached at Appendix 1 to the report 
189 - 236 
12  Digital and IT Strategy - 2024 to 2027
Submit report by the Chief Officer (Business and
Digital) seeking approval of the Digital and IT Strategy
for 2024 to 2027 
237 - 274
Page 4 of 326

Page 5

13  Integration Scheme Review - Post Consultation
Update
Submit report by the Chief Officer (Health and Social
Care for North Lanarkshire) seeking approval of the
revised Integration Scheme 
275 - 326  
EXCLUSION OF PUBLIC
The Sub-Committee is asked to consider passing the
following resolution: "That under Section 50A(4) of the
Local Government (Scotland) Act 1973, the public be
excluded from the meeting for the following item of
business on the grounds that it involves the likely
disclosure of exempt information as defined in
paragraph 14 of Part 1 of Schedule 7A of the Act". 
14  Review of Serious Organised Crime and Counter
Terrorism Arrangements
Submit report by the Chief Officer (Legal and
Democratic) providing an update on the
Council’s arrangements in addressing the risks arising
from Serious Organised Crime (SOC) and Terrorism
(copy herewith to Members only) 
Page 5 of 326

Page 6

Page 6 of 326

Page 7

AUDIT  AND  SCRUTINY  PANEL  -  20  NOVEMBER  2023 
1
20 November 2023 at 1 pm. 
A Meeting of the AUDIT  AND  SCRUTINY  PANEL 
PRESENT 
Councillor Watson, Convener; Councillors Brannan-McVey, Fisher, Hughes, Hume, D. Johnston, Leckie,
B. McCulloch and Robinson. 
CHAIR 
Councillor Watson (Convener) presided. 
IN  ATTENDANCE 
Chief Officer (Audit and Risk); Chief Officer (Legal and Democratic); Business Strategy Manager; Strategy and
Performance Manager; Principal Auditor and Democratic Services Manager. 
APOLOGIES 
Councillor Dunbar, Vice-Convener; Councillor Duffy-Lawson, and P. Murray and J. Boyd, Audit Scotland. 
DECLARATIONS  OF  INTEREST  IN  TERMS  OF  THE  ETHICAL  STANDARDS  IN  PUBLIC  LIFE  ETC. 
(SCOTLAND)  ACT  2000 
1. There were no declarations of interest. 
SELF  EVALUATION  OF  THE  AUDIT  AND  SCRUTINY  PANEL  -  OUTCOME  REPORT  AND 
IMPROVEMENT  PLAN 
2. There was submitted a report by the Chief Officer (Legal and Democratic) (1) reminding the Panel of
its terms of reference as contained in the Council’s Scheme of Administration; (2) explaining that the
Council’s governance arrangements are reviewed on an annual basis through the Strategic
Governance Framework throughout the year as part of the Internal Audit programme of audit work;
(3) reporting that an Internal Audit review in 2021 had considered that there was a risk that “the Council
may not be able to adequately demonstrate that it has effective Audit Committee arrangements and/or
arrangements to ensure Elected Members have the skills, knowledge and, where appropriate or
required, access to relevant training and resources to effectively undertake their role”; (4) advising
that, to this end, Internal Audit recommended that the Panel should, in line with good practice,
periodically undertake a self-evaluation of how effectively it is discharging its role; (5) reminding the
Panel that in September 2023 it had received an overview of the evaluation framework, the process,
and the timetable and, at that meeting, the Panel had agreed that self-evaluation should also be
undertaken by former members who had been on the Panel since May 2022; (6) reporting the
outcomes and findings from the questionnaire, and (7) attaching, as Appendices to the report, (a) a
synopsis of the self-evaluation of the Panel; (b) 25 good practice questions, and (c) the Improvement
Plan. 
Thereon, A. Aitken highlighted that a report would be submitted to the Policy and Strategy Committee
in December 2023 proposing that the use of substitute members for the Audit and Scrutiny Panel be
removed so as to ensure consistency of membership and greater understanding of the issues being
considered by the Panel. 
Item 2
Page 7 of 326

Page 8

AUDIT  AND  SCRUTINY  PANEL  -  20  NOVEMBER  2023 
2
Decided: 
(1) that it be recognised that the outcome from the self-evaluation demonstrates the extent to
which the Panel is effective in discharging its Audit and Scrutiny roles and, as such, fulfils the
recommendations made by Internal Audit; 
(2) that the implementation of the Improvement Plan, attached at Appendix 3 to the report, which
further strengthens the Panel’s working practices and identifies any further developments
required in this respect, be approved, and 
(3) that the next steps as detailed in the report be endorsed. 
STRATEGIC  FRAMEWORK’S  ANNUAL  POSITION  STATEMENT 
3. There was submitted a report by the Chief Officer (Business and Digital) (1) reiterating to the Panel
the inter-related strategic frameworks that focus on ensuring a corporate “one Council” approach in
respect of policy, governance, performance, self-evaluation, project management and demonstrating
improved outcomes for communities; (2) explaining that these frameworks are key to assessing the
success of The Plan for North Lanarkshire and ensuring its delivery through the Programme of Work
as appropriately aligned, planned, guided, implemented and governed; (3) advising that, to ensure
that these frameworks remain aligned to The Plan for North Lanarkshire, and to support delivery of
the Programme of Work, each is on a schedule to undergo regular review and refresh; (4) reminding
the Panel that, since 2020, an annual position statement has been presented to it to support its role in
providing an independent review of the Council’s governance, risk management, performance and
control frameworks, and (5) reiterating that various reports in respect of these frameworks had been
considered by the Panel during the previous year and that this composite annual position statement
report aimed to provide a high level summary and up to date position by setting out the background,
current position, and next steps for each framework. 
Decided: 
(1) that the annual position statement for each framework, and the next steps to ensure each
remains aligned to The Plan for North Lanarkshire, and that delivery towards achieving the
overall vision is appropriately aligned, planned, guided, implemented, governed and
monitored, be acknowledged, and 
(2) that it be noted that a corresponding Review Programme supports each framework which
ensures that all relevant matters are kept under review, updated as required, and reported to
the relevant Committee for Elected Member oversight and scrutiny. 
STRATEGIC  PERFORMANCE  FRAMEWORK  -  PERFORMANCE  REPORTING  SCHEDULE 
QUARTERLY  PERFORMANCE  ASSURANCE  REVIEW 
4. There was submitted a report by the Chief Officer (Business and Digital) (1) reminding the Panel that
it had received reports at its meetings held in February and May 2023 detailing the performance
assurance reviews that had been undertaken of performance reports and which had been submitted
to Council Committees during that previous Committee cycle; (2) explaining that, in bringing together
a summary of the Council’s performance reports into one composite assurance overview, this
approach supports the Panel in maintaining strategic oversight and awareness of the Council’s
performance reporting arrangements in line with its remit; (3) providing the outcome from the latest
performance assurance review that has been undertaken of performance reports submitted to Council
Committees during cycle 3 of 2023, and (4) attaching, as Appendices to the report, (a) Chief Officers’
individual six monthly performance reviews at Service Committees in line with the Strategic
Performance Framework, and (b) Chief Officer Service specific performance reporting which takes
place each year to meet business and/or statutory obligations.
Page 8 of 326

Page 9

AUDIT  AND  SCRUTINY  PANEL  -  20  NOVEMBER  2023 
3
Decided: 
(1) that the composite overview of performance reporting provided in the Appendices to the report
to maintain an awareness of each report within the performance reporting schedule for
2023/2024 be noted, and 
(2) that there are no areas of significant issues arising from the overview as presented in the
Appendices attached to the report which the Panel considered required additional scrutiny or
an additional report to be submitted from the respective Chief Officer to a future meeting of
the Panel. 
AUDIT  AND  RISK  RELATED  ITEMS  ACTION  LOG 
5. There was submitted a report by the Chief Officer (Audit and Risk) enabling the Panel to track
implementation of requests and recommendations made by it in respect of Audit and Risk related
items in the previous 18 months, with the action log, attached as an Appendix to the report, recording
those requests and recommendations made by the Panel, when these had been addressed and/or
were expected to be addressed. 
Decided: that the content of the report be noted. 
INTERNAL  AUDIT  PROGRESS  REPORT 
6. There was submitted a report by the Chief Officer (Audit and Risk) (1) providing an overview of Internal
Audit activity; (2) reporting the results of the Internal Audit outputs finalised since the last update to
the Panel in August 2023; (3) highlighting the most significant issues arising from the completed audit
work; (4) updating the Panel on other aspects of the work of Internal Audit, and (5) attaching, as an
Appendix to the report, a brief summary of the scope and key findings of each substantive planned
audit, together with a summary pack containing copies of those reports. 
During consideration of this matter, concerns were expressed by the Panel on the issues highlighted
in the report regarding school excursions and trips and a request was made by the Panel that the Chief
Officer (Education) attend a future meeting of the Panel to explain the issues relating to school trips
and excursions identified by Internal Audit and the actions to be taken by the Service to resolve these
issues.  The Panel also requested, given the number of critical audit reports that had been received
by the Panel, that the Chief Officer (Education) attend and outline actions being taken by the Service
to address the audit findings in relation to weaknesses at establishments in the management of school
funds. 
In addition, in relation to climate change, the Panel recommended that the findings of the relevant
Internal Audit report be highlighted to the Policy and Strategy Committee, as in the view of the Panel,
there needed to be awareness across the organisation that current ambitions in relation to climate
change were unlikely to be achieved in the timescales which had been previously agreed by the
Council and there needed to be greater clarity as to how the Council would achieve any future targets
agreed by the Council and/or statutory targets set by the Scottish and UK Governments. 
Decided: 
(1) that the findings, conclusions and recommendations of the completed Internal Audit reports,
together with the associated management responses, be noted; 
(2) that Internal Audit provide a report to future meetings of the Panel reporting progress made
by management in implementing agreed management actions in relation to all audit
recommendations categorised as “high” or “medium”; 
Page 9 of 326

Page 10

AUDIT  AND  SCRUTINY  PANEL  -  20  NOVEMBER  2023 
4
(3) that the Chief Officer (Education) attend a future meeting of the Panel to report (1) on the issue
of school trips and excursions, in particular in relation to the issues raised in the Internal Audit
report, the actions to be taken to resolve and mitigate these issues and risks, and (2) on how
the Service will seek to secure improvements in the management of school funds, financial
controls to be put in place, all prior to April 2024 when it was anticipated that the new
excursions policy would be implemented, and 
(4) that it be recommended to the Policy and Strategy Committee that it note the concerns of the
Panel that there needs to be an awareness across the organisation that previously agreed
targets in relation to climate change are unlikely to be achieved within the previously agreed
timescales and that there needs to be greater clarity as to how the Council would achieve any
future targets agreed by the Council and/or statutory targets set by the Scottish or UK
Governments. 
INTERNAL  AUDIT:  FOLLOW-UP  OF  ACTIONS  PREVIOUSLY  AGREED  BY  MANAGEMENT  IN
RESPONSE  TO  AUDIT  RECOMMENDATIONS 
7. There was submitted a report by the Chief Officer (Audit and Risk) (1) detailing the extent to which
management had implemented actions previously committed to in response to recommendations in
Internal Audit reports, where those actions were due to be completed by the end of September 2023;
(2) advising that Internal Audit had concluded that, of the 29 outstanding Internal Audit
recommendations, 10 had been completed and 19 had been partially implemented; (4) attaching, as
an Appendix to the report, commentary from management and details of proposed management
actions, together with revised target dates for completion of those outstanding audit recommendations
where Internal Audit had assessed the residual risk as high or medium, and (5) attaching, as
Appendices to the report (a) Internal Audit recommendations: management actions assessed as “not
yet complete” in this cycle; (b) residual risk rating definition, and (c) outstanding audit
recommendations at November Committee Cycle where the original implementation date is due. 
During consideration of this matter, the Chief Officer (Audit and Risk) informed the Panel that the Chief
Executive had recently written to all Chief Officers reminding them of the need to ensure that all of the
deadline dates should be complied with by Services. 
Decided: 
(1) that the contents of the report be noted; 
(2) that the recommendations made by Internal Audit, attached as an Appendix to the report, be
noted; 
(3) that it be noted that, due to sickness absence within Audit and Risk, some audit assignments
may not be completed to the reported timescales due to the reduced capacity within that team,
and 
(4) that it be noted that the Chief Executive had recently written to all Chief Officers reminding
them of the requirement to ensure that planned actions are progressed in a timely manner and
regularly monitored to ensure that all deadline dates were complied with by Services. 
RISK  MANAGEMENT  UPDATE 
8. There was submitted a report by the Chief Officer (Audit and Risk) (1) providing an update on
developments and changes in relation to the Corporate Risk Register, and other risk management
developments since the last update to the Panel in September 2023, with a particular focus on changes
to corporate risk scores and new or emerging issues; (2) reminding the Panel that the Corporate Risk
Register is formally reviewed annually to ensure completeness and continued alignment to the
Page 10 of 326

Page 11

AUDIT  AND  SCRUTINY  PANEL  -  20  NOVEMBER  2023 
5
Council’s strategic objectives; (3) noting that all corporate risks identified and agreed as meriting
inclusion in the Corporate Risk Register were subject to regular monitoring and review by relevant
senior management and periodic review and that consideration of individual risks for both the
Corporate Management Team and the Panel, in line with their respective governance roles, takes
place; (4) advising that there had been no additions to the Corporate Risk Register since the last
update, although active consideration is being given to including the issues of re-enforced autoclaved
aerated concrete (RAAC) in the Council’s property estate; (5) reporting two changes to residual risk
scores since the last updates of the Panel, and (6) attaching, as an Appendix to the report, the 2023-24
Corporate Risk Register. 
Decided: 
(1) that the current scoring for risks on the Corporate Risk Register for 2023/24, as detailed in
Appendix 1 to the report, be noted, and 
(2) that the information contained within the report in respect of risk management arrangements
in relation to corporate risks and risks within Services be noted. 
Page 11 of 326

Page 12

Page 12 of 326

Page 13

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    AMcP / EK / GT Date 14/03/24 
Strategic Capital Investment Programme 2024/25 to 2028/29 
From  Andrew McPherson, Depute Chief Executive  
E-mail McPhersonA@northlan.gov.uk Telephone 07939 280467 
Executive Summary
The purpose of this report is to inform Committee of the process and outcome of the
development of the Council’s Strategic Capital Investment Programme for the 5-year
period from 2024/25 to 2028/29. 
The report highlights record levels of capital investment of £660 million over the next five
years as the Council continues the delivery of its long-term place shaping transformation
of North Lanarkshire’s towns and communities. Alongside record levels of investment in
the Council’s housing provision through the Housing Revenue Account, this represents
potential investment of £1.465 billion in North Lanarkshire’s town and communities. 
The report will detail the forecast level of resources and expenditure over the 5-year period,
explain the approach to prioritisation of the capital bids and highlight potential risks and
opportunities that may impact on the strategic capital investment programme in future
years. 
Key highlights in the proposed investment programme include:
• £250 million to continue investment in the Town and Community Hub programme,
• City Deal investment of £91 million, including resources to progress the East Airdrie
Link Road project,
• £39 million investment in the Council’s Economic Regeneration Delivery Plan to
support the ongoing transformation of North Lanarkshire’s town centres, including
ongoing work to transform Cumbernauld town centre, 
• £34 million key infrastructure investment in bridges, flooding, active travel and road
safety,
• £11 million investment in the Parks Masterplan, including funding to enable the
redevelopment of Strathclyde Park Watersports Centre,
• £20 million investment in business and digital systems as the Council continues its
digital offering, and
• £10 million investment in Community Boards with a key aim of evolving the
Council’s approach to facilitating community asset transfers. 
Item 4
Page 13 of 326

Page 14

1. Background 
1.1. The Council’s current 5-year Strategic Capital Investment Programme from 2021/22 to
2025/26 was approved at Policy and Strategy Committee in March 2021 with annual
updates in each financial year. 
1.2. Following the approval of the Council’s renewed Programme of Work to 2028 and
previous commitments to review capital programme delivery, at its meeting in October
2022 Policy and Strategy Committee endorsed the development of a new five-year
capital plan to commence from 2024/25. 
1.3. This approach aimed to ensure that there would be a greater degree of economic
certainty in relation to issues such as interest rates, house building and government
funding intentions. 
1.4. Although that greater certainty has not necessarily materialised, the Council’s Strategic
Capital Delivery Group has continued to work on the development of a reset capital
programme to be driven by the Corporate Asset Management Plan approved in 2022
and to ensure that potential funding for the Council’s ambitions was maximised. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Acknowledges the process for the development of the 5-year strategic capital
investment programme,
(2) Approves the use of one-off resources associated with the changes in accounting
for service concessions to augment capital programme resources as outlined in
paragraph 2.10 and 2.11,
(3) Acknowledges the forecast resources available to fund the capital programme,
(4) Approves the 5-year strategic capital investment programme, 
(5) Instructs the Council’s Strategic Capital Delivery Group to establish the indicative
annual phasing of the capital programme to support future Treasury Management
Strategy reports and thereafter monitor progress against the delivery of expected
outcomes,
(6) Acknowledges the update on Town and Community Hubs as outlined in
paragraphs 2.25 to 2.27,
(7) Acknowledges the impact of project commitments on future capital investment
cycles as outlined in paragraphs 2.28 to 2.31, and
(8) Approves the updated Capital Strategy 2024/25 to 2028/29 contained in Appendix
2. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Page 14 of 326

Page 15

2. Report 
Forecast Resources 
2.1. The strategic capital investment programme has been developed based on the latest
estimates of available resources including government grant, Community Investment
Fund, known external funding and prudential borrowing: 
£000
Core Funding 
General Capital Grant 106,670
Community Investment Fund (including carry forwards from the
former SC21 programme)
376,324
Prudential Borrowing (Spend to Save) 2,440
External Funding (including City Deal) 67,734
Capital Receipts 16,750
Sub-Total 569,918  
Additional One-Off Funding 
Residual Strathclyde Pension Fund cost reductions 44,791
Service Concessions 44,800
Sub-Total 89,591  
Total Forecast Resources 659,509 
2.2. The previous strategic capital investment programme assumed annual General Capital
Grant from the Scottish Government of £23.380m. However, following confirmation of
the Local Government Finance Settlement in January 2024 the Council’s General
Capital Grant is due to reduce to £21.334m. The resources forecast assumes this lower
level of General Capital Grant each year in the 5-year cycle. These single year
settlements reduce the reliability of resource forecasting given the short-term nature of
the Local Government Financial Settlement. The Scottish Government has previously
committed to providing multi-year indicative allocations but the most recent
announcement was for one year only. 
2.3. The forecast resources from Community Investment Fund (CIF) are reflective of the
scenario presented to Policy and Strategy Committee in September 2023. Members
will recall that the latest CIF projections continue to assume that Elected Members will
ringfence 1% of future Council Tax rises (or equivalent) to fund the strategic capital
investment programme. 
2.4. A key part of the Community Investment Fund modelling is the requirement to complete
an annual review of the assumptions and projections. Each review has been presented
to Policy and Strategy Committee and in the event that the assumptions change
significantly this would be considered by the Council’s SCDG in line with its Terms of
Reference and ensuring ongoing compliance with the principles of the Council’s Capital
Strategy. 
2.5. The most recent review included a sensitivity analysis outlining the impact of changes
in the key variables affecting the total funding available for community investment
including: 
2.5.1. Failure to agree the 1% contribution from Council Tax in any one year would
reduce resources available by £38.815m over the 10-year Community
Page 15 of 326

Page 16

Investment Fund period and would require equivalent reductions in capital
investment opportunities. Conversely a decision to increase the proportion of
Council Tax allocated to the Community Investment Fund would increase the
resources available but would have the potential to increase the proportion of
future budget gaps to be met from the delivery of recurring revenue savings. 
2.5.2. The previous review included prudent estimates of future housing growth
linked to the strength of the economy, cost of living crisis and increased cost
of borrowing. Housing growth in excess of current assumptions could
significantly increase the availability of resources. One of the key aims of the
Council’s Programme of Work to 2028 is to promote economic growth which
would include private sector housing investment. This has the potential to
improve resources available to support community investment. 
2.5.3. Furthermore, the recent review assumed average interest rates of 4.75% will
apply over the remainder of the current 10-year Community Investment Fund
period. As Committee will be aware, these interest rates are highly dependent
on wider economic factors. A 1% increase in interest rates would reduce
funding by £47.793m but a decrease of 1% would increase forecast resources
by £41.158m.   
2.6. The proposed capital programme assumes resources of £2.440m to support the
continuation of the Council’s spend-to-save investment in LED street lighting. 
2.7. External capital funding in support of the Council’s capital programme is forecast to be
£67.734m over the 5 year period. This is largely reflective of City Deal Grant and known
Scottish Government grant contributions for areas such as Vacant and Derelict Land
Fund, Regeneration Capital Grant Fund and Placed Based Investment Programme. It
also makes an assumption of anticipated funding from the Scottish Government’s
Learning Estate Investment Programme for Chryston High School extension. 
2.8. Projected capital receipts of £16.750m have been included in the programme based on
the current estimates of likely future receipts from asset sales. Capital receipts can be
significantly influenced by external market factors so, like all areas of capital resources,
this will be kept under continual review. 
2.9. Following approval of the Council’s 2024/25 Revenue Budget on 15 February 2024 and
acceptance of the Section 95 Officer’s recommended budget strategy, the strategic
capital investment programme assumes the release of one-off resources of £44.791m
from the cost reductions associated with Strathclyde Pension Fund employer
contributions to augment the capital programme and the Town and Community Hub
programme. 
2.10. In addition, at the Council meeting on 23 February 2023 Elected Members approved a
change in the accounting for all of the Council’s existing service concession
arrangements. This changed the way the Council accounts for the public private
partnership (PPP) and design, build, finance and maintain (DBFM) arrangements on
an ongoing basis but the retrospective application of the change in accounting also
released a one-off benefit of £44.800m which can now be applied to the strategic capital
investment programme. 
2.11. While the Strathclyde Pension Fund cost reductions are ‘cash backed’ this one-off
accounting benefit is not and, as highlighted in the report to Council in February 2023,
the Council will be required to borrow to fund this expenditure. Therefore, utilising this
Page 16 of 326

Page 17

one-off benefit to support the capital programme ensures that additional borrowing
costs can be managed over the life of the assets and the impact incorporated into the
Council’s Medium Term Financial Planning assumptions. 
2.12. Comparing this programme to the previous 5-year programme on a like for like basis
highlights a 12% increase and ensures this capital programme is the largest ever
proposed by North Lanarkshire Council. The scale of Council backed investment
should be seen in the context of a forecast reduction in the General Capital Grant of
nearly 9% over the same period, and provides a clear statement as to the ambition for
economic growth and development by the Council. 
Programme Development 
2.13. The strategic capital investment programme has been developed in conjunction with
Services and led by the Strategic Capital Delivery Group (SCDG). 
2.14. Services submitted capital bids to the SCDG using a standard template to evidence
alignment with asset management planning requirements and Council priorities.
Services were asked to categorise capital bids as follows:
• Unavoidable commitment – where projects have commenced, are legally
committed or have fully funded committee approval from 2024/25 to 2028/29. 
• Asset Management Planning requirement – for projects required to ensure
a continued level of service and / or to prolong the life of existing assets. 
• New Investment – where the project is being proposed in support the
Council’s revised Programme of Work to 2028. 
2.15. The scale of ambition across the Council was demonstrated by the value of bids
submitted. Bids totalling £1.655 billion were submitted against the total funding
availability of £659.509m. With a significant degree of over-subscription the SCDG has
been required to match available resources to projects and themes using a prioritised
scoring model. 
2.16. The capital bids were assessed and prioritised using a scoring model similar to that
used in the Council’s previous strategic capital investment programme. The key factors
and associated weighting are highlighted in the following table: 
Criteria Score
(%)
1. Statutory requirement  20
2. Manages the Council’s risks 20
3. Revenue consequences 
(high score for delivering savings, low score for increasing cost base)
15
4. Deliverability 15
5. Impact on carbon management 10
6. Contribution to Programme of Work 20
Total 100 
2.17. Whilst not explicitly stated as a key criteria, the Council’s stated aim of tackling poverty
is captured as part of the assessment criteria through the statutory requirement,
management of risks and, in particular, contribution to the Programme of Work
categories where individual bids were required to highlight how the project proposal
would improve the Council’s health check indicators, including the percentage of people
economically active and reducing relative poverty. 
Page 17 of 326

Page 18

2.18. During the evaluation process the Unavoidable Commitment category was expanded
to include an assessment of those projects or elements of projects that must be
completed to reduce the risk of service failures on areas such as key digital
infrastructure, key bridge infrastructure etc. 
2.19. Projects identified within the expanded Unavoidable Commitment category were top
sliced from the available resources, with the remaining bids assessed in accordance
with their relative weighted score against the criteria identified in paragraph 2.15. Those
projects with the highest weighted score were allocated the highest percentage of their
overall bid value and conversely if projects scored below the threshold no funding was
allocated. 
2.20. Finally, a programme moderation process was completed to assess any significant
outliers from the previous funding allocations i.e. where funding allocations were
significantly reduced or significantly increased. In addition, the final moderation process
considered whether the funding allocation model created any situations where the
available funding would result in a do not proceed dilemma and whether that outcome
had any significant impacts on the Council’s key ambitions. 
Strategic Capital Investment Programme 
2.21. The outcome of the process outlined above is the following strategic capital investment
proposal, set out by individual service area: 
Service Area Total Proposed
Allocations
2024/25 to 2028/29
£000
Enterprise and Communities  
Assets and Procurement 76,657
Assets and Procurement – Town and Community Hubs 250,074
Community Operations 112,030
Place 164,550
Enterprise and Communities Sub-Total 603,311  
Chief Executive’s 
Business and Digital 20,110
Strategic Communications and Engagement 10,369
Chief Executive’s Sub-Total 30,479  
Adult Social Care 11,000  
Contingency 14,719  
Total 659,509 
2.22. This programme delivers significant ongoing capital investment in North Lanarkshire’s
communities which will support the Council’s ambitions for place making transformation
while supporting the creation and maintenance of jobs in the local economy. 
2.23. To ensure the programme can be appropriately phased to match delivery requirements
and to support ongoing financial and project monitoring arrangements, Committee is
asked to instruct the Council’s SCDG to work at pace to develop a 5-year profile of
expenditure that delivers outcomes for North Lanarkshire’s communities while being
Page 18 of 326

Page 19

matched to the resources available to the Council. The 2024/25 element of the 5-year
profile will form the basis of budget monitoring reports to Committees for the 2024/25
financial year. 
2.24. In line with the SCDG Terms of Reference, the programme outlined above and in
Appendix 1 will remain under continual review as the programme evolves and will
continue to be reported for approval at Policy and Strategy Committee in Cycle 1 each
year to ensure that the programme continues to reflect any changes in priorities and /
or changes in the resources available. 
Town and Community Hub Programme 
2.25. The proposed strategic capital investment programme’s largest constituent part is the
Town and Community Hub programme with a proposed allocation of £250.074m,
representing 38% of the overall resources available. This is largely for the completion
of the currently approved programme and includes an allowance for increased delivery
costs. 
2.26. The remaining balance for new projects will be assessed by the Council’s Town and
Community Hub Project Board in accordance with prioritisation matrix as approved at
Policy and Strategy Committee in March 2020. The outcome of this review will be
reported through the Education, Children and Families Committee but it is expected it
will include consideration of the potential for delivery of Community Hubs at Glenboig,
Ravenscraig and Abronhill. 
2.27. However, Committee should be aware that in keeping with the rest of the strategic
capital programme it may not be possible to deliver on all expected outcomes within
the current 5-year period as the Council needs to manage project delivery timescales
within the overall envelope of finances available. 
Future Years 
2.28. During the bidding process, Services were required to provide indicative information
linked to funding commitments required beyond the current 5-year cycle. The longer-
term planning for future commitments will allow the Council to manage the expectations
of what future capital plans can deliver in light of known commitments and ensure that,
where appropriate, any future commitments are built into medium term financial
planning processes. 
2.29. One such future commitment that goes beyond the 2024/25 to 2028/29 timeframe is
City Deal. While this report proposes expenditure of £91m in the current 5-year cycle
to progress projects such as East Airdrie Link Road, there will be ongoing requirements
in the next 5 year capital cycle from 2029/30 to 2033/34. Despite receipt of City Deal
grants to partially fund the programme, the expenditure profile beyond the current 5-
year cycle is currently estimated to be circa £180m which is an increase of around
£100m as a result of the impact of inflationary pressures and cost increases resulting
from the complexity of road infrastructure such as bridges and ground conditions, as
well as land acquisition and compensation. Therefore, there is likely to be a significant
increase in the Council’s contribution to the City Deal programme from the previously
assumed £90m to around £181m. 
2.30. Similar to the above is the continued commitment to the delivery of the Town and
Community Hub Programme. Recent market increases have seen estimated costs for
a Town Hub facility increase to around £140m. Although there still exists a commitment
Page 19 of 326

Page 20

to deliver on this ambition and exploratory works will commence over the term of this
capital programme, this will be another consideration as to the shape and funding of
the longer-term capital programme.   
2.31. In planning for these future commitments, Committee should be aware that they may
limit scope for other capital investment priorities, or may require re-prioritisation of
projects e.g. within the City Deal programme, as highlighted at Policy and Strategy
Committee in December. In addition, this may create additional recurring revenue
consequences. These potential consequences will be monitored through the SCDG
and, if appropriate, factored into the Council’s Medium Term Financial Plan. 
Housing Revenue Account Capital Programme 
2.32. While this report focuses on the Council’s General Fund capital programme, Committee
should be aware of the record levels of forecast investment in the Council’s current and
future housing stock. Over the same 2024/25 to 2028/29 period the HRA’s 30 year
business plan assumption includes forecast investment of £806m across the
mainstream programme and new supply programme. This represents the current
planning assumption while recognising that it continues to be subject to agreement on
future investment targets and funding from rental increases. 
Overall Community Investment 
2.33. Combining the updated General Fund Strategic Capital Investment Programme with
forecast investment in the Housing Revenue Account means that the Council currently
forecasts total Community Investment of £1.465 billion over next five financial years. 
Review of Capital Strategy 
2.34. In accordance with Prudential Code requirements, the Council carries out ongoing
reviews of the Capital Strategy. The updated Capital Strategy is shown in Appendix 2.
The principles outlined and adopted within the Strategy remain largely unchanged from
the previous iteration. 
3. Measures of success 
3.1  The SCDG will continue to monitor the financial performance and operational delivery
of the strategic capital investment programme to ensure completion of the programme
in line with available resources.     
4. Supporting documentation   
Appendix 1 – Strategic Capital Investment Programme – 2024/25 to 2028/29
Appendix 2 – Capital Strategy 2024/25 to 2028/29 
Andrew McPherson
Depute Chief Executive 
Page 20 of 326

Page 21

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The financial impacts are outlined throughout the report. The Council’s SCDG has
responsibility for ongoing management of the strategic capital investment
programme and the monitoring of the overall programme will continue to be
presented to Finance and Resources Committee at each committee cycle. 
The SCDG will continue to monitor the potential impact of future capital
commitments to ensure aligned with ongoing funding strategies and medium term
financial planning processes. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐
Page 21 of 326

Page 22

If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Through SCDG the Council will be managing ongoing risks associated with the
strategic capital investment programme, including but not limited to:
• Failure to spend in-year capital grant which may result in any unspent portion
being returned to the Scottish Government. However, given the significant level
of Community Investment Fund investment this is risk is deemed to be low at
this stage. 
• Project delays and programme issues that impact on the delivery of the
programme and result in increased costs or reduced outcomes. These risks will
be managed through individual project governance arrangements with
oversight provided by SCDG.
• Commitments beyond the current 5-year cycle will continue to be monitored
and refined with updated funding strategies and incorporated into the Council’s
established medium term financial planning processes. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Page 22 of 326

Page 23

Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 23 of 326

Page 24

Strategic Capital Investment Programme 2024/25 - 2028/29 Appendix 1    
Project / Theme 5 Year Total
£000  
Asset and Procurement Solutions
Maintaining Existing Assets (windows, re-roofing, re-wiring and condition
survey works for the Council's building assets)
33,174
Carbon Management 3,219
Office Rationalisation 6,693
Health & wellbeing and Digital Classrooms 743
Rationalisation including ASN & Social Work 6,254
Curriculum Development 2,258
Sustainable Estate 6,681
Outdoor Education and Outdoor Spaces 4,171
Future Capital Receipts Investment 3,162
Design Fees  9,149
1140 Early Learning and Childcare Expansion 654
Water Quality 500
Sub-Total Asset and Procurement Solutions 76,657  
Town and Community Hubs
Town and Community Hubs 250,074
Total Town and Community Hubs 250,074  
Community Operations
Operational and Infrastructure Development  23,957
Greenspace and Cemeteries 16,549
Greenspace Climate Resilience and Wellbeing 489
Parks Master Plan (including Strathclyde Park Watersports Centre
Redevelopment)
11,217
Roads and Street Lighting/Asset Management 56,982
Contaminated Land and Resilience 2,837
Sub-Total Community Operations 112,030  
Place
Economic Regeneration (including investment in town centre regeneration
and business and industrial infrastructure)
38,791
City Deal 91,218
Enterprise Projects 271
Infrastructure and Transportation improvements (including investment in
bridges, reservoirs, flood risk mitigation and road safety improvements)
34,271  
0
Sub-Total Place 164,550  
Total Enterprise and Communities 603,311 
Page 24 of 326

Page 25

Strategic Capital Investment Programme 2024/25 - 2028/29 Appendix 1    
Project / Theme 5 Year Total
£000  
Adult Social Care
Equipment and Adaptations 11,000
Total Adult Social Care 11,000  
Business & Digital
Line of Business (LOB) System Portfolio 11,986
End User Device (EUD) Refresh 4,646
Digitisation & Innovation 3,479
Sub-Total Business & Digital 20,111    
Strategic Communications and Engagement
Community Board Project Investment Fund 10,369
Sub-Total Strategic Communications and Engagement 10,369    
Total Chief Executive's  30,479  
Corporate Contingency  
Contingency  14,719
Total Contingency 14,719    
TOTAL GENERAL SERVICES CAPITAL PROGRAMME 659,509        
HRA Mainstream Investment Programme (indicative) 806,031
TOTAL COUNCIL CAPITAL INVESTMENT 1,465,540 
Page 25 of 326

Page 26

Capital Strategy 
to 2028/29   
Page 26 of 326

Page 27

Page 1 
Contents 
Page Number
Executive Summary 2
Introduction 3
Capital Governance and Programme Arrangements   4
Capital Funding Sources 5
Capital Bids Methodology 8
Capital Project Ranking and Selection Process  10
5 year Capital Programme 2024/25 to 2028/29 11
Programme Monitoring  11
Knowledge & Skills 12
Treasury Management Strategy and Prudential Borrowing  13
Future Steps 15   
Appendices 
A. Summary of Corporate Strategies and Policies aligned to the Capital
Strategy to 2028/29
16
B. Capital Bid Template    19
C. Summary of Prudential and Treasury Management Indicators 25 
Page 27 of 326

Page 28

Page 2 
Executive Summary 
Following the publication of the revised Prudential Code for Capital Finance in Local Authorities 2021,
there is a requirement for councils to produce a Capital Strategy.
The purpose of the Strategy is to provide the framework to ensure the Council creates an asset base
that meets the shared ambition for North Lanarkshire to be the place to Live, Learn, Work, Invest and
Visit. This shared ambition musters combined resources and delivers change in a way that recognises
the need for partnership and co-operation to address challenges through integrated solutions and make
a difference to the lives of people who live in North Lanarkshire’s communities. 
The objective and aim of the Strategy is to ensure the Council takes capital expenditure and investment
decisions in line with the Council’s priorities, service objectives and properly takes account of
stewardship, value for money, prudence, sustainability and affordability.
The Strategy forms part of the Council’s integrated approach to corporate resource planning in line with
the overarching Financial Strategy, aligning with other Council Corporate Policies and Plans informing
the capital investment process.
It is a means of developing capital investment proposals up to 2028/29 based on available resources
aligned to The Plan for North Lanarkshire, Best Value, the Financial Regulations, the Corporate Asset
Management Plan, and the Medium Term Financial Plan established within the overarching Financial
Strategy. A brief summary of these is provided within Appendix A.
The Strategy sets out the governance and programme management arrangements and the expected
level of skills and knowledge required in capital programme management to enable the Council to
achieve its capital investment objectives. The Council has in place a Strategic Capital Delivery Group
(SCDG) to oversee the identification of capital funding resources, project approval and the day to day
management of the capital programme including the realignment of resources and programme delivery. 
The Strategy outlines the requirement to access various capital funding sources which are available to
the Council including capital grants, capital receipts and prudential borrowing. It also recognises
opportunities for collaborative working or taking advantage of new funding opportunities to support
economic growth and Ambition.
The Strategy highlights the risks that may impact upon the Council achieving its aims and objectives
for capital expenditure and investment, including the risk of delay in starting and completing projects
and the risk of cost overrun. Inherent treasury management risks are also highlighted which may impact
upon the affordability and delivery of the approved capital programme. These include interest rate,
liquidity, and legal and regulatory risk, heavily influenced by the external environment.
In accordance with the Strategy, the Council has a model for allocating limited capital finance to
competing projects, using a formal capital bid template and a project ranking and selection process. 
The approved capital programme categorises investment across a number of themes and projects
organised through individual service groupings.  
Please note in accordance with the governance arrangements, the SCDG has the ability to agree a
realignment of resources and programme delivery. 
Thereafter the Strategy outlines the monitoring processes and mechanisms put in place to ensure that
projects are delivered on time, within budget and provide the desired level of service output. Page 28 of 326

Page 29

Page 3 
Finally the Strategy recognises the importance of good Treasury Management (TM) practice as an
important factor in achieving the aims and objectives of the Capital Strategy identifying prudential
borrowing as an important funding source. The TM team manages the Council’s annual borrowing
strategy as laid out within the approved Treasury Management Strategy.
Introduction
Following the publication of the revised Prudential Code for Capital Finance in Local Authorities 2021,
there is a requirement for councils to produce a Capital Strategy. 
The Council has prepared a Strategic Capital Investment Programme for approval at Policy and
Strategy Committee on 14 March 2024. This Capital Strategy to 2028/29 (“the Strategy”) represents a
refresh of the strategy document further developing the previous approach in light of the Prudential
Code requirements.
The purpose of the Strategy is to provide the framework to ensure the Council creates an asset base
that meets the shared ambition for North Lanarkshire to be the place to Live, Learn, Work, Invest and
Visit. This shared ambition musters combined resources and delivers change in a way that recognises
the need for partnership and co-operation to address challenges through integrated solutions and make
a difference to the lives of people who live in North Lanarkshire’s communities. 
The objective and aims of the Strategy are to ensure the Council takes capital expenditure and
investment decisions in line with the Council’s priorities, service objectives and properly takes account
of stewardship, value for money, prudence, sustainability and affordability.
Capital expenditure is used to acquire or upgrade physical assets of the Council, such as Property,
Plant or Equipment. By definition, all capital expenditure incurred by the Council must result in a new
asset being created, an existing asset being enhanced or its useful economic life extended. 
Capital Expenditure eligibility is assessed on an individual basis with reference to the CIPFA Code of
Practice on Local Authority Accounting (CIPFA ACOP) and associated accounting standards and
practitioner notes.
Capital expenditure is expenditure of the local authority which falls to be capitalised in accordance with
proper accounting practice. 
The Strategy forms part of the Council’s integrated approach to corporate resource planning which
forms part of the Council’s overarching Financial Strategy, aligning with the Strategic Policy Framework
informing the capital investment process.
It is a means of formalising the development of capital investment proposals up to 2028/29 based on
available resources aligned to The Plan for North Lanarkshire, Best Value and Efficiency, the Financial
Regulations, the Corporate Asset Management Plan, and the Medium Term Financial Plan established
within the overarching Financial Strategy. 
A brief summary of these is provided within Appendix A emphasising their context in developing the
Strategy.
The Strategy considers the priorities which will inform the Council’s approach to investing in its assets,
in the context of the capital resources expected to be available, reports on progress and identifies
measurable objectives for the timeframe of the Strategic Capital Investment Programme.
Page 29 of 326

Page 30

Page 4 
It is underpinned by the Council’s Corporate Asset Management Plan approved in September 2022
setting out a strategic framework for the effective delivery of asset management planning. The approach
to asset management planning is based on developing best practice including “A Guide to Asset
Management and Capital Planning in Local Authorities” published by CIPFA.
In accordance with the governance arrangements, the SCDG may redirect resources between financial
years and across projects or themes to ensure ongoing alignment with the Council’s priorities and to
manage emerging risks. 
It is essential to achieve the aims of the Strategy that a structured approach is adopted to set the capital
programme, its delivery and monitoring, with services working through the Strategic Capital Delivery
Group in a coordinated, corporate manner. The paragraphs below outline the Strategy to be adopted
in terms of developing, setting and monitoring the capital expenditure plans to achieve the main purpose
of the Strategy covering: 
▪ Capital Governance and Programme Management Arrangements,
▪ Capital Funding Sources,
▪ Capital Bids Methodology, and
▪ Capital Project Ranking and Selection process.
Capital Governance and Programme Management Arrangements
Strategic Capital Delivery Group 
To consider and assess service capital bids and develop the Council’s long-term capital programme
and ensure an efficient and effective programme delivery the Council has in place a Strategic Capital
Delivery Group (SCDG) which was initially set up in July 2017. 
It is an officer working group comprising senior officers chaired by the Depute Chief Executive and
includes key Chief Officers from across the Council. The Group advises Elected Members in terms of
capital allocation and project approval and has responsibility for the day to day management of the
capital programme, including the realignment of resources and programme delivery. 
The Group as a minimum meet quarterly prior to each cycle of Policy and Strategy Committee.
The Group objectives being:
• Monitor the Council’s Strategic Capital Investment Programme, including performance against
delivery aims and objectives; 
• Advise Elected Members on capital allocations and project approval, making recommendations
on and amendments to the approved capital programme;
• Ensure the proper alignment of capital resources to allow for effective delivery of the
programmes;
• Monitor expenditure projections against budgets and available resources, revising these where
necessary, subject to the limits set out in its approved Terms of Reference;
Page 30 of 326

Page 31

Page 5 
• Ensure robust governance arrangements around the delivery, monitoring and reporting of
capital programmes;
• Consider the quarterly capital monitoring report to Finance and Resources Committee to ensure
appropriate actions are agreed for review by Elected Members;
• Ensure Participatory Budgeting principles are embedded in key capital investment decisions of
the Council;
• Arrange and undertake training/awareness sessions as required to reinforce skills/knowledge
across the Council in respect of capital monitoring and capital financing;
• Ensure all decisions made by the Group are Intra Vires and in line with The Plan for North
Lanarkshire.
The SCDG make recommendations and amendments to the approved capital programme, as required,
with decisions taken by the SCDG officially reported through regular budget monitoring reports
considered by individual Service Committee reports and also by service management teams.
As the SCDG is scheduled to meet quarterly, the approval of business cases and funding allocations
may be delegated to a project board specifically set up for this purpose if agreed by the SCDG.
Capital Funding Sources
In the early stages of developing the Council’s capital programme it is important that the Strategy
identifies all potential sources of capital funding as this will be a key component in the Council achieving
the aims and objectives of this Strategy. 
Funding levels will drive the level of capital expenditure which is prudent, sustainable and affordable,
aligned to the financial challenges within the Medium Term Financial Plan, the Council’s priorities, the
corporate asset management plan and ensuring value for money. There are a number of alternative
funding sources available to the Council which are considered.
Scottish Government 
The Scottish Government provides the Council with funding to support capital expenditure in the form
of two types of capital grant, General Capital Grant and Specific Capital Grants. 
General Capital Grant is provided to the Council as part of the annual Local Government Settlement.
Councils are able to spend this grant on capital projects that meet local and national priorities. A General
Capital Grant offer is made to individual local authorities each year through the issue of a grant offer
letter.
Specific Capital Grants are also known as specific purpose grants or ring-fenced grants, and may only
be used by local authorities for specific purposes. The terms and conditions of each grant are set out
separately in the grant offer letters. The Council will receive some Specific Capital Grants through the
Local Government Finance Settlement with additional Specific Capital Grants paid out with the Local
Government Finance Settlement.
Capital Receipts 
Page 31 of 326

Page 32

Page 6 
Capital receipts represent money received from selling land, buildings or other capital assets which
may only be used to fund new capital expenditure or the repayment of debt principal through the Capital
Fund.
The Council has approved procedures for dealing with surplus assets, details of which are outlined
within the Corporate Asset Management Plan.
The general principle for the use of Capital Receipts is that any receipts generated from the sale of
assets will be considered corporately with the potential for these to be used to augment the investment
in the capital programme.
The sale of assets will also link to the various corporate strategies approved by the Council with these
resources potentially earmarked to fund priorities.
The capital strategy adopted in relation to capital receipts should recognise key factors which may
require mitigation which influence the potential receipts achievable including: 
▪ Over reliance on a small portfolio of disposals whereby the addition/removal of a surplus asset
from the original projections has a significant impact on receipts;
▪ A drop in economic performance of the UK impacting on development; 
▪ Changes in legislation/planning permission/statutory consents.  
Other External Funding 
The Strategy will consider innovative sources of finance to provide funding for projects which are of the
nature, scale and size to attract to attract external funding support. This may include:
Joint Working with Community Planning Partners and Shared Services
Improving joined-up service delivery, the need to demonstrate Best Value and financial constraints are
factors that may cause the Council to consider joint procurement of capital assets. The different capital
funding, procurement, VAT rules across the public sector will have to be taken into account in
considering this option.  Historically the Council has pursued a number of joint projects, e.g. the
construction of the Buchanan Centre, Wishaw Hub, the Clyde Valley Residual Waste Management
Facility and Chryston Community Hub.
Scottish Futures Trust Initiatives / Partnership with Private Developers/Joint Bodies
Working in partnership with private developers could lever in private sector investment to achieve
Council objectives within a realistic timescale. This could also include new initiatives developed by the
Scottish Futures Trust e.g. DBFM Hubco for schools, the SALIX Energy Efficiency Programme and
Joint Body contributions to works e.g. Strathclyde Passenger Transport.
Leasing Arrangements  
Leasing assets may be considered as an alternative to owning assets, e.g. to provide flexibility in
service delivery where the Council would not want to be locked into owning assets which could become
obsolete through changing technology or as a result of changing demographics or demand for service. 
Prudential Borrowing 
Page 32 of 326

Page 33

Page 7 
The Local Government in Scotland Act 2003 introduced the Prudential Code for Capital Finance with
effect from 1 April 2004. The key objectives of the code are to ensure that the capital investment plans
for local authorities are affordable, prudent, sustainable linked closely to TM practices.
Adopting the Prudential Code, prudential borrowing can be used to meet the shortfall in other capital
funding sources, i.e. the capital financing requirement, with revenue funding, informed by the MTFP,
available to meet the implications of capital expenditure, both borrowing costs (interest and principal
repayments otherwise known as ‘loan charges’) and other revenue implications. As a result, the capital
and revenue planning processes are fully integrated and decisions are taken on the level of borrowing
that is deemed to be affordable, prudent and sustainable. 
Capital expenditure levels are determined, based on an assessment of the current asset base and the
identification and prioritisation of investment needs, as identified using the capital bid methodology
described below with the level of spending assessed in conjunction with the capital funding sources
available.
By implementing the approach outlined within this Strategy and the associated TM Strategy, the Council
will have in place the tools to fulfil the objectives of the Prudential Code. This includes the setting and
monitoring a number of statutory Prudential and TM indicators, which include the setting of borrowing
limits. The prudential indicators for capital expenditure plans are encompassed within the Council’s TM
Strategy, with a brief summary of its content within the Treasury Management Strategy and Prudential
Borrowing section below.
The Council adopts the strategic approach outlined above in identifying capital funding sources which
inform the development and setting of the strategic capital investment programme.
Initiatives linked to Prudential Borrowing
Community Investment Fund
The creation of the innovative Community Investment Fund supports the significant investment in North
Lanarkshire’s communities. Prudential borrowing is undertaken with the associated loan charges
financed by the anticipated growth in Council tax income, directly linked to the Ambition programme.
This ensures the financial benefit accruing from Ambition is used to support investment in local
communities. Similarly subject to Council approval, the potential and pace of growth of the fund could
be enhanced by setting aside a portion of the any Council Tax increase.  
Annual updates are provided to Policy and Strategy Committee on Community Investment Fund
assumptions and the impact of these updates on funding available is incorporated into capital planning
and resourcing considerations managed through the Strategic Capital Delivery Group. 
Capital Funding Sources: Considerations and Risks
Reduced Capital Funding   
In developing a capital programme there are a number of assumptions made in terms of funding
sources, relying on past current and future projections. Therefore a risk exists that capital plans may
need to be revised and priorities re-assessed if the level of resources available is reduced.  For example
there has been a significant reduction in capital grant funding in recent years because of the state of
the public finances and there remains uncertainty as to future grant levels. The remit of the SCDG is to
monitor resources available and take appropriate action.
Page 33 of 326

Page 34

Page 8 
Treasury Management Risks 
The delivery of the Capital Programme is closely aligned to the TM Strategy and in particular the
borrowing strategy which informs the level of ‘Prudential Borrowing’ which is affordable, sustainable
and prudent. There are a number of inherent risks associated with TM including interest rate, liquidity,
and legal and regulatory risk. A number of these risks are influenced by the external environment and
will be monitored as their influence may require capital plans to be revised. Examples include: 
The Scottish Government has the power to limit the level of prudential borrowing under Section 36 of
the Local Government in Scotland Act 2003 (Scotland) and any limit imposed nationally would have an
impact on the Council’s ability to resource its capital programme if borrowing is required to meet the
shortfall in other resources available.
The Council currently has access to finance at competitive rates via the Public Works Loan Board from
the National Loans Fund. Any decision by HM Treasury to limit access to or increase the rates for
borrowing from the PWLB would impact on the cost of financing capital investment and aligning to the
MTFP may require capital plans to be revised. 
Operational Risks
The nature of capital projects means that there are operational risks associated with their delivery,
including the risk of delay in starting and completing projects and the risk of cost overrun. This Strategy
promotes an environment that should ensure risks are explicitly set out in capital proposals and action
identified to mitigate these risks. 
Capital Bids Methodology 
Whilst striving to identify all the capital funding sources available, the Council should ensure that it has
a capital bid process which captures all the necessary information to assess how the project aligns with
The Plan for North Lanarkshire, corporate asset management plan, medium term financial plan,
treasury management and achieving value for money.
This approach requires Services to complete a Capital Programme Bid template (see Appendix B), fully
and accurately as possible, to facilitate an effective and informed decision-making process. The
purpose being to assist the Council’s Strategic Capital Delivery Group (SCDG) to identify and
recommend the most appropriate and beneficial capital programme.
Services may provide bids at a high level under a common theme or programme of works heading e.g.
wind and watertight programme, energy efficiency etc. However, due consideration can also be given
as to whether it would be more appropriate to bid at a project level e.g. a new build care home , this
may allow for more effective monitoring going forward, should the capital bid be approved.  
Chief Officers and Managers must provide sufficient evidence and supporting detail to support their
submissions.
Within the capital bid template the following information is provided:
Objectives
A brief outline is required to identify the high level aims and objectives of the programme.  Services are
asked to identify how the project should be classified with the appropriate rationale provided:
Page 34 of 326

Page 35

Page 9 
▪ Unavoidable Commitment – relate to projects that have commenced or have been committed
by committee decision but are not fully funded within the current capital programme;
▪ Asset Management Planning Priority – Capital projects to ensure a continued level of service
and/or prolong the life of existing assets. In addition, it may be considered that if capital
expenditure is not undertaken, a detrimental impact may result on either service provision,
asset life, or customer satisfaction. Asset Management Planning is essential to the
development of the Capital programme. Any project identified within this category should
appear in Corporate Asset Management Plan or individual service or function asset
management plans.  
▪ New Investment – Where the project is being proposed in support of the Council’s The Plan
for North Lanarkshire Programme of Work to 2028. 
Financial Summary
Services should provide a reasonable estimate of when the project will start as well as the estimated
completion date. This should be supported by estimated phasing of the investment needed.  Due to the
restrictions of funding available any flexibility in the phasing should also be identified as additional
information.
Given many projects and programmes span across multiple years service are asked to identify any
estimated expenditure from 2029/30 to 2033/34 to ensure that any financial commitments can be
incorporated into the Council’s medium term financial planning processes. 
Where there are ongoing revenue implications associated with capital investment proposals, services
are asked to provide an estimate of any recurring savings and recurring costs. 
Key Deliverables
As part of the SCDG’s ongoing monitoring of both the financial aspects of the capital programme and
the outputs / outcomes, Services are required to provide details of the targeted outputs and outcomes
for each year of the 5-year cycle. Examples of outputs could include, for instance, the number of window
replacement projects, the number of town centre sites regenerated and the numbers of end user
devices refreshed. Examples of planned or anticipated outcomes would include the impact of condition
survey projects on the overall condition of the school estate, improved occupancy of town centre sites
and improved system and network performance. 
To support the monitoring and evaluation of projects Services are also asked to outline how they will
demonstrate that the stated outputs and outcomes have been achieved / delivered. 
Risk Impact
The capital bid documentation makes reference to Audit Scotland guidance on effective capital
programme management which expects councils to have robust risk management arrangements in
place. It also recognises that a key part of capital programme delivery can be in helping the Council to
manage risks by improving the condition of assets etc. Services are asked to provide information to
help assess the contribution their projects would make to the Council’s overall risk management
framework, including identification of:
• Corporate or service risks the project will help to mitigate,
• Risks that are inherent in the project,
Page 35 of 326

Page 36

Page 10 
• Risks of not undertaking the project, and 
• How the project’s risks will be managed. 
Programme of Work to 2028
Services are asked to include an assessment of how the project they propose contributes to each of
the Programme of Work themes. Specifically Services are asked to provide information on the scale of
impact on Programme of Work ‘Initial Actions’, ‘Health Check Indicators’ and ‘What will be achieved’
items as highlighted in the The Plan for North Lanarkshire Programme of Work document published in
March 2023 (Programme of Work to 2028)
Public Sector Equality Duty and Fairer Scotland Duty
Where the project / programme has an impact as a result of the Public Sector Equality Duty and / or
Fairer Scotland Duty Services are asked to provide a brief summary and consider whether it would be
appropriate to complete and publish the relevant assessment. 
Additional Information
This section is used to provide any additional information that Services consider would further support
any element of the above or their capital bid as a whole.  Please note that this should be kept to a
minimum, ensuring information and evidence is succinct to allow the SCDG to fully assess the bid.
Capital Project Ranking and Selection Process
Following the submission of the capital bids from Services, the SCDG members are responsible for
scoring the bids. The overriding principle is to ensure that the capital investment plans align closely to
the priorities of the Council, with each bid assessed as to how it helps advance these aims. This process
also recognises the limits to funding levels available to support the capital investment plans, including
the loan charges and revenue implications incorporated within the Medium Term Financial Plan
projections.
Unavoidable commitments relating to projects that have commenced or have been committed by
Committee decision but are not fully funded within the current capital programme and/or are of strategic
importance should be top sliced from the available resources.
Thereafter capital bids are assessed and prioritised using a weighted scoring model. The key factors
and associated weightings are highlighted in the following table: 
Criteria Score
(%)
7. Statutory requirement  20
8. Manages the Council’s risks 20
9. Revenue consequences 
(high score for delivering savings, low score for increasing cost base)
15
10. Deliverability 15
11. Impact on carbon management 10
12. Contribution to Programme of Work 20
Total 100
Page 36 of 326

Page 37

Page 11 
Four members of the SCDG are asked to score each bid against these criteria on a range of 0 to 5,
with 0 highlighting no contribution / impact and 5 highlighting maximum contribution / impact. 
The individual scores are then combined to provide a consolidated score. This consolidated score is
converted into a percentage which then allows all projects to be ranked in priority order. 
Those projects with the highest weighted score were allocated the highest percentage of their overall
bid value and conversely if projects scored below the threshold no funding was allocated.
Finally, a programme moderation may take place to assess any significant outliers from the previous
funding allocations i.e. where funding allocations are significantly reduced or significantly increased. In
addition, the final moderation programme may consider whether the funding allocation model would
create any situations where the funding available would result in a ‘do not proceed’ dilemma and
whether that outcome had any significant impacts on the Council’s key ambitions. 
5 year Capital Programme 2024/25 to 2028/29
A summary of the approved Capital investment programme between 2024/2025 to 2028/2029 is
outlined in the following table below.  
Service Area Total Allocations
2024/25 to 2028/29
£000
Enterprise and Communities  
Assets and Procurement 76,657
Assets and Procurement – Town and Community Hubs 250,074
Community Operations 112,030
Place 164,550
Enterprise and Communities Sub-Total 603,311  
Chief Executive’s 
Business and Digital 20,110
Strategic Communications and Engagement 10,369
Chief Executive’s Sub-Total 30,479  
Adult Social Care 11,000  
Contingency 14,719  
Total 659,509 
Programme Monitoring 
The approved capital programme should be subject to ongoing financial monitoring to ensure
expenditure and funding levels are in in line with assumptions and forecast during the capital bids
process, the project selection and ranking stage and anticipated capital funding levels.
Elected Members are responsible for considering and approving capital budgets and the Financial
Strategy for the Council. An annual budget report will be presented to Policy and Strategy Committee
at Cycle 1 each year which will take into account any updates on the capital funding available and any
emerging priorities that may have to be considered.  Page 37 of 326

Page 38

Page 12 
Capital Monitoring Reports to Service Committee should be at a level of detail that is clear and
transparent providing members with a proper insight as to how the capital expenditure plans are
progressing. It is expected that as a minimum this will be at theme level.
Reports to the SCDG and Service management teams should include information at individual project
level to ensure full transparency with regard to decision-making. As such, individual Services require to
monitor the capital programme on a project basis, with the information available to Finance staff on a
periodic basis, and to the SCDG as a minimum on a quarterly basis.
Overall responsibility for Financial Management within the Council lies with the Chief Officer (Finance)
therefore Finance staff must be provided with information for individual projects to allow for effective
financial monitoring in accordance with the Council’s Financial Regulations.
SCDG will also periodically seek information from Services to monitor performance of the capital
programme against the anticipated and planned outputs and outcomes to ensure that the overall
programme is delivering as intended. 
The SCDG has oversight of the performance of the Council’s capital programme and will manage
service requests for acceleration, reprofiling and virement process in line with SCDG Terms of
Reference. Post implementation reviews will also be carried out in line with the Council’s approved
project management guidelines outlined within the Corporate Asset Management Plan.
Knowledge and Skills 
The Council has a programme of work to build a sustainable ‘Workforce for the Future’ which includes
development of a Council wide workforce strategy, a broader learning and development strategy and
programme of work, new policy frameworks to enable increased flexibility in working patterns and an
enhanced focus on employee engagement and wellbeing. 
The Capital Programme is managed at service and governance level by a team of professionally
qualified staff who have extensive experiences in asset management, meeting statutory obligations,
delivering new investment initiatives, financial monitoring and compliance with proper accounting
practices.
The technical experience and professional qualifications of staff involved in capital programme
governance, development and delivery should be at a level to ensure the ability to: 
▪ Define processes and procedures;
▪ To identify core capital requirements and priorities;
▪ Work with Services identifying capital needs;
▪ Understand CIPFA Code requirements; 
▪ Understand and manage risk.  
The Chief Finance Officer (S95 Officer) is responsible for ensuring the effective administration of the
financial affairs of the Council in terms of Section 95 of the Local Government (Scotland) Act 1973. The
Council’s Section 95 Officer is the Chief Officer (Finance) and is responsible for Capital Expenditure
and is supported by a team of professionally qualified accountants who follow a continuous professional
development plan.  
Page 38 of 326

Page 39

Page 13 
To assist in ensuring proper capital accounting practices are adopted in respect of capital expenditure
the Finance team has prepared a ‘Capital Accounting Procedures & Guidance Note’.
This document is distributed to all finance staff involved in capital finance by request from by contacting
the Capital Accounting team within Finance. 
This guidance covers the following areas: 
▪ Capital Expenditure, initial recognition and capitalisation;
▪ Capital Income – treatment of capital receipts, grants etc; 
▪ Principles of Capital Accounting, Policies and Valuation;  
▪ Non-Current “Fixed” Asset Register. 
Treasury Management Strategy and Prudential Borrowing 
In delivering the Strategy an important funding source is prudential borrowing and the TM team are
responsible for funding this adopting the Council’s annual borrowing strategy laid out within its TM
Strategy. 
Treasury Management is defined as the management of an organisation’s investments, cashflows,
banking, money market and capital market transactions; the effective control of the risks associated
with those activities; and the pursuit of optimum performance consistent with those risks.
The TM strategy considers the affordability of the capital financing requirement otherwise known as
‘Prudential Borrowing’ also factoring in the following within its borrowing strategy:
▪ Costs of refinancing of maturing debt; 
▪ Loan debt repayment policy; 
▪ Maintenance of prudent cash levels.
The TM Strategy is developed based on assumptions and forecasts across a number of areas with a
key driver being the capital expenditure plans and the level of prudential borrowing: It incorporates:
▪ Debt and investment projections; 
▪ Interest rates projections;
▪ Borrowing and investment strategies;
▪ TM performance measures;
▪ Policy on repayment of loans funds advances; 
▪ Treasury Management/Prudential Indicators.
The Prudential Code requires that this Strategy be aligned with the TM strategy. In this regard and to
promote an integrated approach between the capital expenditure plans and TM strategy, the Council
incorporates the Prudential Indicators with regard to capital expenditure within its annual TM Strategy.
Page 39 of 326

Page 40

Page 14 
The TM strategy detailing the Council’s debt position, including the anticipated level of debt, the
authorised borrowing limit and capital expenditure plans.
The capital expenditure plans determine the borrowing need of the Council and the TM process
essentially monitors the cash flow to ensure the Council can manage its capital spending obligations
by adopting the borrowing strategy outlined within the TM strategy. 
The outputs from the capital expenditure plans being reflected in Prudential Indicators, which are
calculated to assess if capital expenditure plans are: 
▪ Affordable e.g. the proportion of financing costs to net revenue stream
▪ Prudent and Sustainable e.g. implications of external borrowing and an assessment of
borrowing costs and interest rate forecasts/expectations;
▪ Providing value for money, e.g. options appraisal;
▪ Ensuring stewardship of assets, e.g. asset management planning;
▪ Meeting service objectives, e.g. strategic planning for the authority; 
▪ Practical e.g. achievability of the forward plan.
The definitions of the key mandatory indicators required by both the CIPFA Prudential Code and the
CIPFA Treasury Management Code are contained within the Council’s Treasury Management Strategy
which was presented to Finance and Resources Committee on 28 February 2024 (Treasury
Management Strategy 2024/25; Treasury Management and Prudential Indicators 2024/25 to 2028/29).
The indicators listed below are adopted to demonstrate that the Council Capital investment plans are
prudent, affordable and sustainable as follows:
▪ Prudential Indicator: The Capital Expenditure Plans;
▪ Prudential Indicator: Capital Financing requirement (CFR);
▪ Prudential Indicator: CFR and limits to Borrowing activity;
▪ Prudential Indicator: Authorised Limits;
▪ Prudential Indicator: Operational Boundary;
▪ Prudential Indicator: Proportion of Financing Costs to Net Financing Stream; 
▪ TM Indicator: Interest Rate Exposures;
▪ TM Indicator: Maturity Structure of Borrowing;
▪ TM Indicator: Credit Risk.
In developing the Strategy linked closely to the Medium Term Financial Plan and determining
affordability, the Council  must take into account the various statutory loans fund repayment options
available for loans fund advances under the relevant statutory guidance and regulations. 
The broad aim of prudent repayment is to ensure that the Council’s capital expenditure is financed over
a period of years which that expenditure is expected to provide a benefit and that each year's repayment
amount is reasonably commensurate with the period and pattern of the benefits.  Page 40 of 326

Page 41

Page 15 
The actual and estimated prudential indicators and the Council policy on loan fund repayments and
future commitments can be viewed within the TM Strategy and Prudential Indicators presented quarterly
to Finance and Resources Committee. 
Future Steps 
The Strategy will continue to be under review. In particular, consideration will be given to the following:
▪ Continuing to review alternative sources of finance, including an assessment of relative costs
and risks to ensure maximum value for money;
▪ Continuing to look for opportunities for joint working with other organisations to improve the
efficiency of capital programme delivery;
▪ Continuing to improve the quality of capital project and programme information to assess
performance again cost estimates, timescales and achievement of benefits;
▪ Ensuring Services investment proposals clearly set out the identification and assessment of
risks for individual projects and the calculation of the associated potential costs prior to
inclusion within future capital programmes;
▪ Developing a continuing programme of training for elected members on capital planning and
investment;
▪ Ensuring that Services retain documentation on the progress of projects so that performance
against plans can be tracked;
▪ Continuing to improve capital expenditure profiling to enable comparison of performance
against milestones. 
Page 41 of 326

Page 42

Page 16 
Appendix A 
Summary of Corporate Plans & Polices aligned to the Capital Strategy to 2028/29         
1. The Plan for North Lanarkshire
In developing the Strategy the key driver is The Plan for North Lanarkshire and the purpose of the
Strategy being to create an asset base which meets the shared ambition where we aspire that North
Lanarkshire is the place to Live, Learn, Work, Invest and Visit. This shared ambition mustering
combined resources and delivering change in a dynamic way that recognises the need for partnership
and co-operation to address challenges through integrated solutions and make a difference to the lives
of people who live in our communities. 
The Plan for North Lanarkshire focuses on the five priorities aiming to:
▪ Improve economic opportunities and outcomes;
▪ Support all children and young people to realise their full potential; 
▪ Improve the health and wellbeing of our communities;
▪ Enhance participation, capacity and empowerment across our communities; 
▪ Improve North Lanarkshire’s resource base
Within these five priorities there are 25 high level ambition statements.
In developing the Capital Programme the SCDG are required to assess and score how each project
submitted for consideration contributes towards achieving the Council priorities and their related
ambition statements with a weighting applied to each priority sub-divided for each of their related
ambition statements. Further detail regarding the capital bids and project ranking selection process and
how it achieves the selection of projects aligning to corporate strategies is detailed within the Strategy.
2. Corporate Asset Management Plan
The effective use of Council assets is a key priority for the Council and the Corporate Asset
Management Strategy drives forward proposals for capital investment via the Capital Bids process
described within the Strategy. One of the criteria for making a capital bid, within the objective section
of the capital bid template, is whether the proposed capital expenditure is deemed an ‘Asset
Management Plan Priority’, emphasising the importance of having a working Corporate Asset
Management Plan (CAMP) in place. 
A corporate approach to asset management will support the development, on-going scrutiny and
monitoring of the capital programme and initiatives for future investment. Assets are the second largest
cost to the public sector after payroll costs and the approach to asset management can influence both
the quality of public services and the money that is available to the frontline and other services.
The Council’s CAMP published in 2022 relates to the period 2021 to 2026 sets out the Council’s strategy
for managing its assets (Corporate Asset Management Plan). 
The aim of the Council’s Corporate Asset Management Plan (CAMP) is to maintain and improve the
condition suitability and utilisation of assets in terms of service delivery and best value. 
The Council manages a large and diverse portfolio of assets and depends on relevant up-to-date,
accessible information to allow the Council to make informed decisions on the use of assets. The
Council uses various asset management systems e.g. PISA, GIS mapping system for property to store
information on its non-current assets.  Page 42 of 326

Page 43

Page 17 
The Corporate Asset Management Plan has six overarching objectives:
▪ Work towards the vision and ambitions of The Plan for North Lanarkshire,
▪ Rationalise our asset base to better meet our current and future business needs,
▪ Carry out tactical improvements to our retained assets, 
▪ Ensure that our retained assets are as carbon efficient as possible,
▪ Continue to develop innovative methods of providing new facilities and only provide those
where there is a compelling business need to do so, and
▪ Demonstrate the requirements for any future capital investment to be directed towards meeting
the above objectives. 
3. Financial Strategy: Medium Term Financial Plan
The Council is facing financial challenges recognised within the Council’s Medium Term Financial Plan
(MTFP) in which the implications of striving to achieve the outcomes behind the Strategy will have
financial implications. 
Given the ongoing level of uncertainty around Scottish Government funding in both capital and revenue,
it is considered that a five-year medium-term plan covering the period 2024/25 to 2028/29 is reasonable
and appropriate for planning purposes.
The MTFP has been developed within a continuing challenging financial climate with the Council
constantly facing competing demands for the limited resources available. It reflects latest political, social
and economic factors and their impact on demand for services, resources, other cost pressures and
financial settlements.
The MTFP assists the development of a strategy to ensure resources are allocated across competing
services according to The Plan for North Lanarkshire priorities, ensuring all plans are linked to
Government spending review announcements, new priorities, inflation targets and anticipated changes
in demand.  In addition, the plan takes account of risks which may impact on the Council’s future
resource levels, which therefore can affect its ability to continue to provide high quality services focusing
on the Council’s priorities.
The MTFP also takes into account the latest projections of funding through the Community Investment
Fund which is subject to annual reviews presented to Policy and Strategy Committee. 
4. Best Value & Efficiency  
The Council is committed to ensuring it has Best Value built into its overall service delivery. Best Value
is contained within the overall planning process, with Services required to set clear objectives and
identify the resources required to deliver them, within the service planning process.
The Council has an Audit and Scrutiny Panel charged to audit and review Council processes and
procedures relating to areas of direct service provision, thus ensuring that Best Value processes are
constantly audited and maintained.
Capital investment decisions have a major impact on the delivery of Council services. The Strategy and
the resultant decisions on projects included within the Council’s capital programmes are developed on
Best Value principles.
The Council embraces the Best Value regime and delivers Best Value through the:
▪ The Plan for North Lanarkshire;
Page 43 of 326

Page 44

Page 18 
▪ Equal Opportunities Policies and Procedures;
▪ Consultation Processes;
▪ Corporate Governance Framework;
▪ Local Government Benchmarking Framework 
▪ Strategic Self Evaluation Framework
▪ Sound Management of Resources.
The Council is committed to improving asset management and the Strategy is designed to ensure that
capital investment decisions support the provision of a modern, effective asset base.
5. Council Financial Regulations
Financial Regulations are an integral part of the Council’s framework of internal financial controls, which
are designed to ensure the effective stewardship of the Council’s funds. Compliance with these
regulations will ensure that public money is safeguarded and properly accounted for, and all Council
financial transactions undertaken in a manner which demonstrates openness, transparency and
integrity.
In developing the Strategy recognition has been taken of the Council Financial Regulations and in
particular Section 4 Capital Expenditure which covers the following areas:
▪ Capital Programme Development & Preparation ▪ Setting of Capital Estimates
▪ Right to Proceed ▪ Acceleration & Emerging Projects
▪ Spend Approvals ▪ Revenue Consequences
▪ Contingency Sums/ Deviation  ▪ Agents
The Financial Regulations also make reference to the Terms of Reference of the SCDG approved by
the Policy and Resources Committee. These are designed to facilitate the effective management of the
Council’s capital investment including capital planning, programme development and monitoring
processes with further details of the SCDG remit included within the Strategy under Capital Governance
and Programme Management Arrangements.  
Page 44 of 326

Page 45

Page 19 
Appendix B
North Lanarkshire Council
Strategic Capital Investment Programme 2024/25 to 2028/29
Capital Bid Template 
Prepared By: Date: Version   
Project Title/Theme:  Project Ref: 
Service / Division: 
Estimated Cost / Project Bid: 
1. Objectives
Please provide a brief outline of the high level aims and objectives of the project /
programme? 
How should the project be classified (check box)? 
• Unavoidable Commitment (legally committed or committee approved only) ☐
• Asset Management Plan requirement ☐
• New Investment to support the Programme of Work to 2028  ☐ 
Rationale for classification:
Unavoidable Commitment
(Details of legally committed contracts,
projects that have already commenced,
committee approved etc)   
Asset Management Plan requirement
(Provide details of links to corporate or
service asset management plans etc and
statutory basis for the project)   
New investment
(Highlight the relevant Programme of
Work themes) 
Page 45 of 326

Page 46

Page 20 
2. Financial Summary 
Timescales:
Estimated Start Date 
Estimated Completion Date 
Bid Profile
Year 1
(24/25)
£000
Year 2
(25/26)
£000
Year 3
(26/27)
£000
Year 4
(27/28)
£000
Year 5
(28/29)
£000
Total 
£000
Estimated
NLC Capital
Investment
requirement      
Estimated
External
Match
Funding      
Total       
Please indicate if there’s an expectation that the project will span beyond the current 5-year
capital planning cycle: 
Bid Profile
Year 6
(29/30)
£000
Year 7
(30/31)
£000
Year 8
(31/32)
£000
Year 9
(32/33)
£000
Year 10
(33/34)
£000
Total 
£000
Estimated
NLC Capital
Investment
requirement       
Revenue implications associated with capital investment
Please outline any one-off or recurring revenue implications associated with proposed capital
investment. Where possible quantify the impact and how your service proposes to fund any
additional costs: 
Description of Impact Value
(£000)
Savings
(i.e. reduced energy
consumption,
income generation)   
Costs
(i.e. additional
unbudgeted
maintenance costs,
increased staffing
costs from creation
of new facility)  
Page 46 of 326

Page 47

Page 21 
3. Key Deliverables 
Financial
Year
Targeted outputs for each financial
year
(i.e. number of window replacement
projects; number of town centre sites
regenerated; EUD refresh of estate
etc)
Outcomes planned / anticipated for
each financial year
(i.e. impact of projects on overall
condition of the school estate;
improved occupancy of town centre
sites / increased footfall; improved
system and network performance /
improved business continuity etc)
2024/25   
2025/26  
2026/27  
2027/28  
2028/29   
Page 47 of 326

Page 48

Page 22 
Monitoring and evaluation: 
How will you demonstrate that the objectives, outputs and outcomes outlined above have
been achieved / delivered? 
Risk Impact
Audit Scotland guidance expects effective capital programme management to have robust risk
management arrangements in place. This section will support the evaluation of each project and
the contribution it makes to the Council’s overall risk management framework.   
Which corporate or service
risks will the project help to
mitigate? 
What risks are inherent in
the project? 
What are the risks of not
undertaking the project? 
How will the project’s risks
be managed? 
Page 48 of 326

Page 49

Page 23 
4. Programme of Work to 2028
This section will support the assessment of New Investment proposals in support of the Council’s
Programme of Work to 2028 Programme of Work to 2028. 
Programme of Work Contribution the project / programme would make to the
Programme of Work 
(Please provide an idea of the scale of impact on PoW
‘Initial Actions’, ‘Health Check Indicators’ and ‘What will
be achieved’
Transforming Places 
Invest In North
Lanarkshire 
Sustainable Futures 
Resilient People 
Brighter Futures 
Digital NL 
One Service 
Page 49 of 326

Page 50

Page 24 
5. Public Sector Equality Duty and Fairer Scotland Duty
Where the project / programme has an impact as a result of the Public Sector Equality Duty and /
or Fairer Scotland Duty please provide a brief summary: 
PSED and FSD Impact 
Where there is an impact services should ensure that an assessment has been carried out and
published in accordance with the Council’s guidance. 
6. Additional information
Please provide any additional information that may be relevant. 
Additional information 
Page 50 of 326

Page 51

Page 25 
Appendix C
Summary of Prudential and Treasury Management Indicators 
1. Prudential Indicator:  The Capital Expenditure Plans
The Prudential Code requires the Council to outline its capital expenditure plans taking into account the
sources of funding available and also the cost to the Council in supporting any additional borrowing
burden which will require to be paid for from the Council’s own resources. The Government has power
to control the level of prudential borrowing although no control has yet been implemented.
2. Prudential Indicator: Capital Financing Requirement (CFR)
The CFR is essentially a measure of Council’s underlying borrowing need i.e. capital expenditure which
is not resourced by capital grants, receipts or CFCR and any new borrowing will increase the CFR. The
CFR includes long term liabilities representing outstanding leasing obligations and PPPs.
3. Prudential Indicator: Limits to Borrowing Activity
To ensure the Council operates its activities within well-defined limits it needs to ensure that it’s total
borrowing net of any investments, does not, except in the short-term, exceed the total of the CFR in the
preceding year and the next two financial years.
4. Prudential Indicator: The Authorised Limit for External Debt.
This represents the maximum limit beyond which borrowing is prohibited. Although this limit is deemed
to be affordable in the short-term, it is not desirable or a sustainable level of borrowing for the Council.
This is the Affordable Borrowing Limit required under the Local Government (Scotland) Act 2003.
5. Prudential Indicator: The Operational Boundary for External Debt.
This indicator is based on the expected maximum external debt during the course of the year; it is not
a limit. This operational boundary allows flexibility to borrow, re-invest and undertake debt restructuring
during the course of the year. It is therefore possible and acceptable, for actual borrowing to vary around
this boundary for short periods during the year.
6. Prudential Indicator: Affordability - Proportion of Financing Costs to Net Revenue Stream.
Within the prudential framework, prudential indicators are required to assess the affordability of the
capital investment plans, providing an indication of the impact of the capital investment plans on the
overall Council finances. Since capital expenditure impacts on the revenue budget through financing
charges, the Council needs to ensure that financing costs not only remain affordable, but also do not
constitute an excessive proportion of the revenue resources available.
7. Treasury Management Indicator: Interest Rate Exposures
The Treasury Management Code requires the Council to set limits regarding its maximum exposure to
both fixed and variable interest rates, requiring the containment of Treasury activity within these self-
determined upper limits. The Code requires authorities to set limits that manage risk and reduce the
impact of an adverse movement in interest rates, primarily on variable rate loans.  
8. Treasury Management Indicator: Maturity Structure of Borrowing
The Treasury Management Code requires the Council to specify upper and lower limits regarding the
maturity structure of its fixed rate borrowing in order to minimise the risk associated with the Council
having to replace large sums of fixed rate debt at a time when there may be uncertainty over interest
rate exposure.
9. Treasury Management Indicator: Credit Risk
The Council will manage its credit risk by implementing the approved investment strategy. 
Page 51 of 326

Page 52

Page 52 of 326

Page 53

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref DM/SL Date 14/03/24 
Programme of Work achievements to date 
From  Des Murray, Chief Executive  
E-mail murraydes@northlan.gov.uk Telephone 01698 302350 
Executive Summary
The Plan for North Lanarkshire was established in 2019 with a very clear vision - inclusive
growth and prosperity for all to bring equal benefits and a fairer distribution of wealth to all
North Lanarkshire’s people and communities. 
Founded on a place-based approach, The Plan for North Lanarkshire is about enhancing
the physical environment of North Lanarkshire in a way that recognises the intrinsic social
value gained in doing so and the need to do so by securing a holistic way of working that
crosses policy setting and service delivery, that integrates more accessible service systems
and solutions, and that targets the growing complexities in the economic, social, and health
issues that exist locally.   
More importantly, The Plan for North Lanarkshire is about making it real for people, to
create (and sustain) the place which local people and communities can identify with - the
place where they live, the place where they work, the place where they learn, and the place
they care about and wish to protect. 
The Programme of Work is the vehicle that is making The Plan for North Lanarkshire real. 
As such, this latest Programme of Work report - looking back at the foundations that have
been built to create the economic, social, and community conditions that are enabling local
people and communities (and the place that is North Lanarkshire) to thrive - shows how
the one place one plan one council approach and ongoing leadership and commitment to
the Programme of Work are making a difference: 
• New hubs are in place at the heart of local communities to support a much wider offering
to people and communities with more direct access to the services they need and
access to earlier, more responsive, and more integrated whole family support.
• The range and affordability of homes has been increased through the provision of high-
quality housing.
• Environmental enhancements have been delivered to support added benefits to general
health and wellbeing, social inclusion, physical and mental health, and public access.
• Transformations to town centres are starting to reshape North Lanarkshire to provide
modern, attractive, and multi-use centres fit for local people today and in the future. 
• Job creation has been expanded by accelerating and attracting investment to create
more and new business opportunities.
• Pathways have been built and skills and knowledge enhanced to smooth the transition
to further education, training, or employment. 
Item 5
Page 53 of 326

Page 54

1. Background 
1.1 Since The Plan for North Lanarkshire was established in 2019, the vision - for inclusive
growth and prosperity for all that brings equal benefits and a fairer distribution of wealth
to all North Lanarkshire’s people and communities - has provided a clear direction that
has been consistently followed in everyday service delivery activities and consistently
embedded in strategic and financial decision making, strategy and policy development,
and corporate governance approaches across the organisation. 
1.2 This unwavering approach has been key to enabling the Programme of Work to be the
delivery vehicle for The Plan for North Lanarkshire in a way that brings cohesion to
strategic planning and community investment and to an integrated one council one plan
approach that has been instrumental in establishing solid foundations for the place-
based approach upon which The Plan is based. 
1.3 Approvals by the Policy and Strategy Committee, which have seen five iterations of the
Programme of Work, have been the catalyst to securing consistency of commitment to
the long-term vision and one plan direction and, most importantly, to the people and
communities of North Lanarkshire.  As reported to the Policy and Strategy Committee
in March and September 2023, this has led to significant achievements to date that can
be evidenced in maximising the potential of North Lanarkshire as a place. 
1.4 In the face of a fast paced, rapidly changing, and relentlessly uncertain local
government environment, the Programme of Work has been instrumental in stabilising
the strategic direction of the council, while allowing for appropriate flexibility in the
operational delivery of many complex inter-connected programmes, projects, and plans
to ensure a dedicated focus on improvement, change, and delivering services that
• This is all supported by more joined up transport links, an enhanced digital
infrastructure, and a network of more active travel routes for pedestrians and cyclists,
all of which are boosting the local economy and securing improved opportunities and
outcomes for employment, education, housing, and leisure, and creating a place where
people want to Live, Learn, Work, Invest, and Visit. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Recognise the key role that the Policy and Strategy Committee play in ensuring the
continuing commitment to delivering The Plan for North Lanarkshire through the
Programme of Work and ensuring strategic oversight in terms of its ongoing
development, co-ordination, and monitoring, and
(2) Recognise the extent of the achievements which have been delivered through the
Programme of Work to date as set out in Appendix 2. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work All Programmes of Work
Programme of Work Statutory / corporate / service requirement
Page 54 of 326

Page 55

improve the lives of local people.  An annual review process has ensured that the
Programme of Work has continued to remain current, relevant, and deliverable. 
1.5 Approved at Policy and Strategy Committee in March 2023, the latest Programme of
Work to 2028 was a change in approach to previous years in that it was reframed within
the latest North Lanarkshire context provided by the 28 Health Check Indicators.  This
new approach was critical to ensure an even greater focus on escalating the pace and
depth of change that is essential to ensure a heightened and more strategic focus on
not only sustaining the economic and community aspects that will enable local people
and communities (and the place that is North Lanarkshire) to thrive, but also on
ensuring a more targeted approach to improving social conditions, outcomes, and
people’s lives. 
1.6 Traditionally annual Programme of Work updates to Policy and Strategy Committee
have covered three related aspects (i.e. (i) looking back at what has been delivered, (ii)
providing updated results for the 28 Health Check Indicators to establish the current
North Lanarkshire context, and (iii) setting out the Programme of Work for the year
ahead).  This approach continued in March 2023, albeit separating these three aspects
into three individual reports on the agenda for Member’s information and due
consideration.  The approach this year continues with the three individual but inter-
related reports; this is the first report in the series of three. 
1.7 This report herewith therefore looks back at what has been delivered to date, with
alignment to the seven Programme of Work priorities for delivery which were approved
by the Policy and Strategy Committee in March 2023 in terms of Transforming Places,
Invest in North Lanarkshire, Sustainable Futures, Resilient People, Brighter Futures,
Digital North Lanarkshire, and One Service.  Appendix 1 provides a summary recap in
terms of what each of these priorities aims to achieve. 
2. Programme of Work achievements to date 
2.1 As reported to the Policy and Strategy Committee in December 2023, the clear
ambitious vision in The Plan for North Lanarkshire was recognised by the Best Value
auditors in their new national thematic approach which considered the effectiveness of
the leadership of the development of the council’s strategic priorities.  In this report the
auditors noted that the vision has been driven by effective leadership and is supported
by a range of performance indicators and performance reporting arrangements. 
2.2 The report concludes positively on the council’s approach to citizen and community 
engagement and recognises the council’s commitment to reducing inequalities and 
tackling poverty.  The report also comments positively on the alignment of strategic and
operational delivery plans (with the council’s financial, asset, and digital plans), the
collaborative working between Elected Members and officers, and the council’s
approach to self-evaluation which supports continuous improvement. 
2.3 The extent of this external validation to the one place one plan one council approach,
and the ongoing leadership and commitment to the Programme of Work, demonstrates
the very sound foundations which are now in place across the organisation to support
and escalate the pace and depth of change that is critical to realise the successful
delivery of the new Programme of Work to 2028. 
2.4 This is further evidenced by the extent of achievements which have been realised to
date through the Programme of Work.  Set out in Appendix 2, these demonstrate the
extent to which the council has focussed efforts on delivering the priorities approved by
the Policy and Strategy Committee in order to improve, change, and deliver services
Page 55 of 326

Page 56

that improve the lives of local people. 
2.5 Appendix 2 demonstrates the extent of these achievements, in summary this means
that: 
• New hubs are in place at the heart of local communities to support a much wider
offering to people and communities with more direct access to the services they
need and access to earlier, more responsive, and more integrated whole family
support.
• The range and affordability of homes has been increased through the provision of
high-quality housing.
• Environmental enhancements have been delivered to support added benefits to
general health and wellbeing, social inclusion, physical and mental health, and
public access.
• Transformations to town centres are starting to reshape North Lanarkshire to
provide modern, attractive, and multi-use centres fit for local people today and in
the future. 
• Job creation has been expanded by accelerating and attracting investment to
create more and new business opportunities.
• Pathways have been built and skills and knowledge enhanced to smooth the
transition to further education, training, or employment. 
• This is all supported by more joined up transport links, an enhanced digital
infrastructure, and a network of more active travel routes for pedestrians and
cyclists, all of which are boosting the local economy and securing improved
opportunities and outcomes for employment, education, housing, and leisure, and
creating a place where people want to Live, Learn, Work, Invest, and Visit. 
Next steps 
2.6  In line with the governance arrangements that have been developed to support 
progress and performance monitoring of the Programme of Work to 2028 - and the
Policy and Strategy Committee’s remit to “oversee the development, co-ordination, and
monitoring of The Plan for North Lanarkshire” and to keep under review such
“programmes as the Committee considers necessary to achieve the council’s long-term
aims and objectives” - the Committee will continue to receive an annual report that
demonstrates achievements to date.  This will be complemented by a six-monthly
update providing key delivery highlights in respect of the seven Programme of Work
priorities. 
3. Measures of success 
3.1 Measures of success will be evidenced through progress being made to deliver the
Programme of Work and ensure the council’s portfolio of programmes, projects, plans,
and activities impact positively on the North Lanarkshire context (evidenced through
the 28 Health Check Indicators) and thereby achieve the long-term vision of inclusive
growth and prosperity for all (as set out in The Plan for North Lanarkshire). 
4. Supporting documentation   
Appendix 1:  Summary of what the seven Programme of Work priorities aim to 
achieve (as approved at Policy and Strategy Committee in March 2023). 
Appendix 2: Programme of Work achievements to date. 
Page 56 of 326

Page 57

Des Murray
Chief Executive 
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The Local Government in Scotland Act 2003 introduced the duty of Best Value; this
requires that councils “make arrangements to secure continuous improvement in
performance”.  
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
Page 57 of 326

Page 58

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
The evidence based strategic planning approach in place through the Programme
of Work that is supported by range of performance indicators and performance
reporting arrangements contributes to the mitigation of the risks on the Corporate
Risk Register for managing strategic change and governance, leadership, and
decision making.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 58 of 326

Page 59

Appendix 1 
Programme of Work priorities to 2028 
Page 59 of 326

Page 60

Appendix 2 
Programme of Work achievements to date 
Transforming Places 
(1) £1.3bn of capital investment approved by the Policy and Strategy Committee for delivery in
North Lanarkshire (over the five-year period from 2021/22 to 2025/26) has contributed
significantly to improving the physical environment of North Lanarkshire’s communities and
supporting economic regeneration. 
(2) Through the Hub programme, three community hubs were completed in 2023 - Newmains
and St Brigid’s (February 2023), Riverbank (August 2023), and Chryston (October 2023). 
Orbiston Community Hub in Bellshill started construction in December 2023 and four are at
the design stage (St Kevin's, St Stephen's, and Gartcosh Community Hubs, along with the
Chryston High extension).  This adds to the 63 new establishments (11 secondary, 36
primary, and 16 family learning centres, including 1140 hours related centres) that have been
built since 1996.  This demonstrates the significant shift in designing multipurpose Town and
Community Hubs that support a much wider integrated service offering in the heart of the
local community, bringing education together with other local services, businesses, and
partnership organisations. 
(3) The 1,000th new build council home was completed on the site of the Holehills high rise flats
in Airdrie in August 2023, which also saw completion of 11 low carbon (net zero) homes which
are part of a pilot to deliver sustainable and affordable homes. 
(4) 1,263 new affordable homes have been built through the council’s new supply programme
since 2010, with a further 347 on site.  Additional sites have been identified and approved at
committee for a further 1,290 homes across North Lanarkshire, including town centre and
phase 1 tower re-provisioning sites.  In addition, over 743 homes have been purchased
through the council’s buy back scheme which, as well as contributing to new supply, helps to
prevent homelessness and enable common works to progress in flatted blocks. 
(5) To date 1,246 properties across high rise towers and low-rise blocks have been (or are
currently being) demolished to date as part of the phase 1 towers re-provisioning programme
(since approved in May 2018).  Work is currently on site at Coursington Towers in Motherwell,
Gowkthrapple low-rise blocks in Wishaw, and Jackson Court and Shawhead back flats in
Coatbridge where a further 4 towers and 30 low-rise blocks are being demolished. 
(6) In May 2023 proposals were approved to consult tenants and stakeholders regarding the
second phase of the Tower Strategy re-provisioning which comprises 974 properties,
including 8 tower blocks. Following a positive response to the consultation, approval was
granted in August 2023 to progress with phase 2 of the re-provisioning programme to create
new, high quality, energy efficient housing that will meet the current and future needs of the
local area. 
(7) Investment has continued in town centres / edge of town projects, with 58 buildings or vacant
sites repurposed or redeveloped since 2018/19.  A further 20 town centre properties / sites
have been acquired by the council with a view to either converting existing properties to
residential developments, building new homes on cleared sites, or upgrading commercial
premises.  Around 7.7 hectares of vacant and derelict land has been improved or enabled
for future industrial use. 
(8) The ten-year Active Travel Strategy (approved in 2021) has put in place - for the first time -
a cohesive and holistic framework to prioritise and accelerate active travel interventions
across North Lanarkshire.  Aligned with the Town Visions and Town and Community Hub
developments, these aim to provide better active travel networks between local communities
and across the local authority boundary, and deliver improved health and wellbeing as well
Page 60 of 326

Page 61

as environmental, social inclusion, and public access benefits.  A number of major active
travel routes for pedestrians and cyclists have been completed in the past year including:
• Between Craigneuk and New College Lanarkshire’s Motherwell Campus at Ravenscraig
- this includes lighting, seating, CCTV, and tree planting along the route.
• A £1.5m active travel link between Newhouse and Salsburgh - the 3.5km link includes
new lighting and improved road drainage. 
• A £1.2m active travel link between Wishaw Station and Wishaw General Hospital - the
1km link includes improved street lighting, four traffic signal controlled pedestrian / cycle
crossings, and four uncontrolled pedestrian / cycle refuge islands.
• A £2m package of active travel, road safety, and junction capacity improvements along
the A73 corridor between the junctions of South Biggar Road / Craigneuk Avenue and
Petersburn Road / Brownsburn Road in Airdrie - this includes improved street lighting,
three mini-roundabouts, two traffic signal controlled pedestrian / cycle crossings, one
uncontrolled pedestrian / cycle refuge island, 450m of new active travel links, new road
carriageway and footway surfacing, improved drainage, and enhanced road signs and
markings. 
(9) High-level design concepts were created for Town Visions as well as associated Town
Prospectuses to inform the future investment strategy for North Lanarkshire’s towns and
enable town centre action plans to be progressed.  Following public consultation, Town Action
Plans have now been completed for Airdrie, Motherwell, and Wishaw, and consultation is
underway in Kilsyth, Coatbridge, Bellshill, and Shotts. Following the acquisition of
Cumbernauld Town Centre in June 2023, work is progressing to develop the future plans for
the town centre, including management arrangements for the shopping centre for the interim
period.   
(10) £9.225m was secured from the UK Levelling Up Fund to support delivery of the Town Vision
for Cumbernauld, including the acquisition of The Centre Cumbernauld.  More recently, £20m
(over 10 years) has been awarded for Coatbridge Town Centre from the UK Government’s
Town Fund to support the delivery of the Town Action Plan. 
(11) A £1.6m redevelopment project in Motherwell town centre has seen work to completely re-
roof, re-render, re-wire, and refurbish the Motherwell Library building.  This investment has
enabled the creation of an inclusive and welcoming library space on the ground floor offering
a larger space for children and young people, more areas to meet, an accessible care area,
and a fresh and welcoming new look and feel.  The investment has also helped to create an
inclusive digital hub on the first floor that is accessible to local community groups,
businesses, schools, and individuals - a space that encourages innovation and effective
learning experiences and supports basic to advanced digital skills development. 
(12) An initial award was secured from the National Lottery Heritage Fund for consultation,
feasibility studies, and research into a multi-million-pound development project at Summerlee
Museum of Scottish Industrial Life in Coatbridge and the Rediscovering Airdrie heritage
project.  This will hopefully lead to subsequent funding awards to significantly expand and
enhance the visitor experiences and attractions on offer at Summerlee, and support the
repurposing and refurbishment of heritage buildings within Airdrie town centre. 
(13) £6.5m investment has commenced at Braidhurst Industrial Estate in Motherwell (part funded
from the Scottish Government’s Regeneration Capital Grant Fund) to improve and expand
available business space and upgrade the surrounding environment to help create more
employment opportunities. 
(14) City Deal investment has seen the completion of two North Lanarkshire infrastructure
projects - Glenboig Link Road in 2018 and (more recently) Motherwell Town Centre
Interchange improvement works at Motherwell Station.  The West Coast main line crossing
has also been completed as part of the Ravenscraig Infrastructure Access improvements,
and work is at various stages of progression on the remaining projects (Orchard Farm
Page 61 of 326

Page 62

roundabout A8, Ravenscraig Infrastructure Access North and South, East Airdrie Link Road,
and Eurocentral Strategic Active Travel).  This investment has started to realise significant
changes in North Lanarkshire through improved regional infrastructure, further partnership
working, and more joined up transport links.  This has helped to connect local communities
to new housing, business investment, and employment opportunities as well as access to
leisure, and health and wellbeing activities. 
Invest in North Lanarkshire 
(15) A pilot project for an Invest in North Lanarkshire advisory service was established in
September 2023 to explore the potential to further support development and investment in
North Lanarkshire. The pilot project brought together a core team from key services across
the council with a diverse range of skills and experience to create a collaborative and
responsive environment that can help support investment in North Lanarkshire. The pilot
team met once a week between late September and mid-December, with a total of seven
projects coming into scope. The service provides bespoke advice to developer identified
matters they should take into consideration when developing their planning application and
seeking statutory consents from the council. By providing this advice at an early stage in the
process this should result in better quality development and a more streamlined process for
obtaining statutory consents, thus accelerating investment in North Lanarkshire.   
(16) Over the last two years, North Lanarkshire has attracted more international investment than
any other local authority in Scotland bringing new jobs, investment, and supply chain
opportunities to the area.  The strong industrial profile and sizeable property market has
drawn international investors to the region, with 11 property transactions completed to the
value of £101.7m since 2021. This investment has seen more than 1,135,036 square feet of
industrial space sold, with Motherwell, Coatbridge, and Cumbernauld providing the most
attractive locations.  This underpins North Lanarkshire’s central position in Scotland as an
attractive place for business and property investors on the global scale, and highlights the
key successes being realised through the range of infrastructure investments in the
Programme of Work. 
(17) The attractiveness of North Lanarkshire to inward investors can also be demonstrated
through recent figures which show that North Lanarkshire is essentially the most productive
local authority within the Glasgow City Region with a gross value added of £37.20 per hour
worked. This is higher than the Glasgow City Region average (£34.40) and also the Scottish
average (£36.60). Gross value added per hour worked is considered a measure of
productivity at a sub-regional level that accounts for different working hours across regions. 
Brighter Futures 
(18) The North Lanarkshire Employer Charter was launched in 2023 to offer recognition from the
council to local employers and to encourage others to look at becoming members. It is based
around four commitments by employers - to pay all staff the Real Living Wage, employ North
Lanarkshire residents, use local businesses in the supply chain where possible, and ensure
fair work practices which attract and retain employees. Businesses which achieve two or
more of these commitments receive a bronze, silver, or gold accreditation. Membership of
the Charter is free.  
• To date 32 businesses have become accredited members of the Charter with 8 achieving
a gold award, 14 silver, and 10 bronze. The council is currently working with those who
have not achieved the highest level to support them towards the next level, with
accreditations being reviewed annually.  
• 42 other employers have registered interest in becoming an accredited member and the
initial evidence gathering process is in place to support these applications.  
• As a result of accreditations, businesses have been working with the council to ensure
future vacancies are available to Routes to Work clients.  Many have also identified they
are keen to engage with local schools as, prior to becoming involved in the Charter, they
Page 62 of 326

Page 63

were unsure how to get involved in this activity or the benefits that could be provided.   
(19) During 2022/23, 15 young people were employed as part of the Young Person’s Guarantee
(a paid employment opportunity for those aged 16-24 years old to work across community
learning and development).  Other work in this area of service led to a total of 44 SQAs
achieved (in IT, numeracy, residential experience, first steps to youth work, and first steps to
family learning) and a total of 85 qualifications achieved (including autism awareness, Solihull
(developing family resilience), Royal Environmental Health Institute of Scotland (REHIS) food
hygiene, first aid, and the Mountain Leader award). 
(20) The council established the Volunteer NL project in May 2023 with support from the UK
Shared Prosperity Fund.  Aimed at building capacity in the council and community groups
through volunteering and broader support in terms of active participation, the project has
seen success in terms of a number of key outcomes:
• Achieving Chartered Status with Volunteer Scotland.  The Volunteer Charter sets out the
ten key principles which help to underpin good relations within a volunteering
environment. 
• Procuring and developing a new volunteer management system, which holds all volunteer
details and provides a one stop shop for volunteer information in the council.
• Establishing a baseline of volunteers with details of training need and deliverables, this
supports projects with specific need that are keen to tap into trained and skilled volunteers.
• Providing training to a number of groups (internal and external) to support volunteering
pathway development. 
(21) Through the Entrepreneurship workstream a series of key developments have taken place
during 2023/24 to create and support an inclusive entrepreneurial culture in North
Lanarkshire.  This includes the following: 
• Business Start-Up Fund - This is one of a range of business grant funding programmes
re-launched by the council which is part-funded through the UK Shared Prosperity Fund.
The purpose of this fund is to provide grant funding to help pre-start businesses with a
robust and viable business idea to start trading earlier than would otherwise be possible.
This offers funding for essential business purchases such as IT equipment, infrastructure,
website design, and stock costs and the structure of the fund has been devised to reflect
the higher start-up costs associated with businesses operating from commercial premises
and/or with employees. It also aims to encourage new start businesses to grow their
operation earlier.  14 grants have been approved to date.
• Launch of the Hive - A new hub has been established over 2 floors within One Wellwynd
in Airdrie to encourage and support more women to get started and grow successful
businesses by providing a mixture of desks, offices / meeting rooms, treatment rooms,
on-site business advice and support, and events and networking opportunities.  Use of
the workspace is completely free until August 2024 and the space is available 24/7 to suit
business needs. The Hive was launched in February 2024 and is part-funded by the UK
Shared Prosperity Fund and the Scottish Government’s Pathways Pre-Start Fund.
• Enterprise Pathway Model - This new model was launched in schools in September 2023
to support young people to develop entrepreneurial skills and knowledge, and to support
them to turn innovative ideas into a business reality. The pathway aims to encourage
young people to discover opportunities within the start-up sector and understand the
mechanics of running a business so that entrepreneurship is viewed as a viable career
choice. The approach will see children and young people develop an understanding of
enterprise, entrepreneurship, and self-employment as a career opportunity, starting with
young children in early years through to S6. 
• Dragons' Lair - Three enterprising pupils from Coltness High School won this year’s
Dragons’ Lair competition at the finals held in November 2023 after pitching their business
idea to four industry experts. 15 North Lanarkshire secondary schools entered the annual
competition which was open to all S3 pupils and aimed to introduce young people to the
world of business and a possible career path they may not have previously considered.
Page 63 of 326

Page 64

21 teams across the 15 schools submitted business plans which were scored by Business
Gateway Lanarkshire advisers and pitched to a panel of dragons who were local business
owners who brought a great deal of business knowledge and experience to proceedings. 
• Social enterprise support - Launched in October 2023, this 18-month programme (part-
funded through the UK Shared Prosperity Fund) aims to support more people to set up
social enterprises and to support existing social enterprises to grow. The activities being
delivered directly support delivery of the council’s Social Enterprise Framework and Action
Plan. As part of the support available, one accelerator with 15 social enterprises attending
has completed and a second with a further 15 social enterprises is underway. The
accelerators cover a range of key topics with specialist consultants to guide the
development and growth of social enterprise. 
• Targeted entrepreneurial support for Black, Asian, and other Minority Ethnic people -
Following a tender award in January 2024 to provide targeted entrepreneurial support to
Black, Asian, and other Minority Ethnic people and groups, a range of support packages
are underway to enable the creation of 75 new businesses and support the growth of
existing business in this respect.
• Enterprising Schools Award - Launched to recognise the work being undertaken by
schools to promote the value of enterprise activity, this allows for good practice to share
with other schools and signposting onto partners to enhance the enterprise offer going
forward.  To date 35 primary, secondary, and additional support needs schools have
achieved this award. 
(22) Supported by the UK Shared Prosperity Fund, NL Academies have 10 projects underway to
support North Lanarkshire residents with upskilling opportunities linked to gaining
employment, further education, or training.  This includes:
• A Built Environment Academy (a low carbon learning programme in partnership with BE-
ST (Built Environment - Smarter Transformation) - This has commenced with the first
phase of learning completing in October 2023.  Over 70 pupils who are carrying out a
Foundation Apprenticeship in Construction, and candidates from supported employment,
attended phase 1 of the programme.  
• SP Energy Networks (SPEN) and council academy project - Within this area, SPEN
identified significant skills gaps within the jointing and civils areas of engineering which
have the potential to impact upon their supply chain and hinder delivery of future
programmes of work within (and outwith) North Lanarkshire.  This project aims to match
underemployed people to jobs within the engineering sector by providing individuals with
a fully funded education and training programme. Candidate numbers have been
identified and agreed by SPEN, course content developed, potential candidates identified
from various sources for a targeted recruitment process, and communications prepared
to publicise the opportunity when it goes live in April 2024.
• Upskilling opportunities for refugees and veterans are being mobilised with a delivery
partner sourced to develop future opportunities and identify candidates. 
(23) The expanded pan-Lanarkshire Care Academy is now fully mobilised with a memorandum of
understanding in place between North and South Lanarkshire Council and NHS Lanarkshire. 
The vision is to develop a robust, sustained, vibrant Care Academy attracting and developing
a diverse workforce for health and care services in Lanarkshire and promoting the sector as
a rewarding choice for careers.  This aims to create the health and social care workforce for
the future that best services the needs of people living in Lanarkshire.  It also aims to help
address deprivation and inequalities by helping people live their lives to the fullest, providing
pathways to fair work and meaningful employment, and ensure progression across the
breadth of health and social care.  Building a strong talent pipeline to meet future demand
and reduce skills shortages will improve the resilience and sustainability of the health and
social care sector across Lanarkshire. 
(24) A Digital Youth Academy project has been developed ready for roll out in April 2024.  This
involves two four-week-long bootcamps for young people (aged 16-24 years old) that also
cover skills such as problem solving, cv building, and preparing for interviews.  This
Page 64 of 326

Page 65

programme will support candidates onto a positive destination of either college or university,
or into an apprenticeship.
• A tech primer bootcamp will cover an introduction to programming, data management,
network infrastructure, cloud computing, IT service requests, technical skills, and an
introduction to cyber security.    
• The digital and business skills bootcamp will include training on office systems, digital
marketing, creative content skills, web skills, and pc passport. 
(25) Industry led sector boards are in the process of being commissioned and supported within
each NL Academy area (i.e. Built Environment, Health and Social Care, and Digital).  The
Built Environment Sector Board is now well established and has met on a regular monthly
cycle through late 2023 and in early 2024.  Led by the industry, this Board has strong
representation and participation from key businesses within the sector who are working in
North Lanarkshire.  The Board has developed a clear statement of intent to drive future
collaborative efforts between industry and the local authority to deliver the development of a
skilled workforce to meet the needs of a rapidly growing built environment industry.   
(26) The Curriculum Content Creation Toolkit was launched during the school session 2022/23 as
a key part of the curriculum re-design action plan in order to leverage change and
improvement. In this first cycle an initial set of four training sessions was delivered, each
containing a spotlight on success and an opportunity to discuss and share thought and
practice. The themes for each session were designed to tie in with the overarching rationale
in the council’s curriculum.  Feedback on these sessions was very positive and has led to
further roll out during the 2023/24 school session and development of a five-year action plan
for curriculum re-design. 
(27) Progression pathways in literacy, numeracy, and digital learning were developed from early
to third level during the school session 2022/23.  These pathways were designed to support
progression within, and across, Curriculum for Excellence levels, ensuring learners benefit
from cohesive and progressive learning pathways that support knowledge and skills
development and improve outcomes.  A full literature review of the active literacy programme
is currently being carried out by the Robert Owen Centre, and the findings from this will inform
future revisions to the programme. 
(28) Science, Technologies, Engineering, and Maths (STEM) support continues to be provided
for schools across North Lanarkshire.  Three secondary schools and 23 primary schools
participated in the Scottish Schools Educational Research Centre (SSERC) primary cluster
programme with a Mentor nominated for each school.  This has led to a STEM leaders
programme being developed to support teachers co-ordinating STEM within their setting,
and the Young STEM Leader Award being piloted for the Future Fridays Leadership
Academy.  Closer partnership working with the literacy, numeracy and learning, teaching and
assessment Education Support Officers has taken place to ensure that STEM support and
training consistently reflects key messages about highly effective practice in literacy and
numeracy across the curriculum. 
(29) An updated Developing the Young Workforce Delivery Plan for 2022/25 sets out the universal
entitlements and additional and intensive supports available to North Lanarkshire’s children
and young people.  Ambitious improvement targets were identified which include school
leaver destinations, the pathways programme for winter and summer leavers, Future Fridays,
and Vocational Education for which activities are being progressed during the 2023/24 school
session that include:
• The pathways programme, which has continued to evolve to support young people at risk
of disengaging from education, entering a negative post school destination, or long-term
unemployment and the many associated challenges.  In total, 141 young people enrolled
on the programme during 2022/23 with 16 returning to school within the first six weeks of
the programme. Of the 125 young people who sustained engagement in the programme,
96% have since entered a positive post school destination. 
Page 65 of 326

Page 66

• A blended summer leaver model, which was delivered between January and June 2023
for S4 pupils for those pupils identified as being unable to sustain school on a full-time
basis, not attend school at all, or being most likely to leave school with no or few national
qualifications and move into a negative post school destination.  Working closely with
secondary schools allowed young people to work towards national qualifications while
also participating in personal development, employability activity, and work-based
learning opportunities.  Feedback and self-evaluation indicated that this model has been
of benefit, and it has since been incorporated into the pathways evolved delivery model
for 2023/24. 
Sustainable Futures 
(30) £7.8m investment in local nature reserves, country parks, and key greenspace sites has
created places where visitors are more active, share better experiences, and stay longer.
Such investment has provided opportunities for improvements in physical and mental health,
environmental education, outdoor education, and heritage appreciation. Recent
improvements include Bellshill-Gateway cycle facilities in Strathclyde Country Park, an
improved path and natural play trail network at Palacerigg, improved parking and visitor
interpretation at Drumpellier Country Park, peatland restoration at greenspace sites in
Cumbernauld, path upgrades at Broadwood Loch, and investment in tree planting and
wildflower planting across community greenspaces. Dumbreck Local Nature Reserve
received National Lottery Heritage funding in 2023 which enabled the appointment of a
project officer to take forward site enhancement and skills development work with the local
community. 
(31) The fifth edition of the Local Biodiversity Action Plan was approved in 2023 to ensure
continued conservation and enhancement of the habitats and species that contribute to the
unique character and heritage of North Lanarkshire while also contributing to the target to
halt the current nature emergency.  Actions within the plan, contributing to the international
target of protecting 30% of the earth’s land and oceans by 2030, will continue to be delivered
at a local and landscape scale by council and partners to 2027 and beyond. 
(32) A range of council initiatives have been initiated to help businesses trade in a more
environmental and sustainable way to aid their growth and improve the sustainability of their
operations.  This has supported 11 businesses to help them transition to a zero-carbon
economic model and facilitate sustainable change and growth.  The Expert Help Framework
has also provided net zero and low carbon consultancy advice to three other businesses.  A
Net Zero Business Challenge Fund has been launched to enable small to medium sized
enterprises bid for funding in order to reduce emissions and/or make their operations more
sustainable. 
(33) A strategic flood risk assessment is being progressed to assist in the prioritisation of flood
management activity throughout North Lanarkshire and delivery of the actions continue from
the Clyde and Loch Lomond Local Flood Risk Management Plan. Flooding from fluvial and
surface water sources are now better understood following the completion of flood studies
and surface water management plans in respect of fluvial flood risk within various areas of
North Lanarkshire (i.e. Airdrie, Coatbridge, Cumbernauld, and Motherwell).  Subsequent
phase 2 studies are underway to further investigate the root cause and potential solutions to
manage flood risk. 
(34) The council was successful in gaining £4.5m from the Association of Directors of
Environment, Economy, Planning, and Transport (ADEPT) on behalf of the Department for
Transport.  This is part of the Live Labs 2: Decarbonising Local Roads in the UK programme,
which will run for three years in partnership with the Transport for West Midlands, Amey, and
Colas in what is an £8.5m joint programme to deliver the Centre of Excellence for
Decarbonising Roads split over a north and south campus. Initial steps have commenced on
seeking out the most promising innovative materials from across the globe for assessment
Page 66 of 326

Page 67

and it is expected that the first innovations will be trialled in a live environment at the start of
2024.  A key aim of the programme is to reduce carbon within a road’s environment and the
carbon baseline for North Lanarkshire has been completed. 
(35) A Local Heat and Energy Efficiency Strategy (LHEES) was approved in December 2023 to
provide a framework for taking an area-based approach to heat and energy efficiency
planning and delivery (i.e. it does not include wider energy planning).  The framework aims
to set out how each segment of the building stock needs to change to meet national
objectives, including achieving zero greenhouse gas emissions in the building sector, and
the removal of poor energy efficiency as a driver of fuel poverty.  It will also identify areas
where there is potential for heat networks and set out the primary measures for reducing
emissions, and prioritise areas for delivery, against national and local priorities. 
(36) Since 2021/22 the council have been awarded over £2.5m by the Social Housing Net Zero
Fund (SHNZF) to supplement the programme budget and improve the energy efficiency of
the council’s BISF (British Iron and Steel Federation) non-traditional type properties. These
properties have low energy efficiency with an Energy Performance Certificate (EPC) of E and
tenants have advised that the properties were draughty and hard to heat. Thanks to the
SHNZF funding and the council’s own investment, these properties were able to have
external wall insulation and PV panels installed, which improved the EPC ratings of these
properties to a band B and made them more comfortable for tenants. 
Resilient People 
(37) An inspection of partnership support services in North Lanarkshire has resulted in a highly
encouraging report for the positive difference made to the lives of children and young people
at risk of harm.  The inspection evaluated the services as very good following engagement
with children, young people, parents, carers, Elected Members, and staff, as well as a review
of cases and a staff survey.  A key conclusion highlighted that integrated, collaborative
support from a range of dedicated agencies was a clear strength in early intervention for
children and young people at risk of harm.  As part of the inspection, successful projects were
highlighted including the virtual school which delivers bespoke services for care-experienced
children and young people and has achieved vastly improved attainment and a marked
reduction in school exclusions, and the Today Not Tomorrow group which has significantly
influenced positive change in North Lanarkshire’s care system. 
(38) Earlier in 2024, North Lanarkshire was the first local authority in Scotland to be recognised
for its comprehensive and sustained efforts to support and increase breastfeeding.  The
council has achieved gold status in the first-ever Breastfeeding Friendly Scotland Local
Authority Award, recognising its commitment to supporting breastfeeding in the workplace
and wider community.  It is hoped that a range of measures implemented over the last three
years have contributed to a marked increase in breastfeeding rates across the region, with
30.4% of babies now being breastfed by their 6-8 week review. 
The council has worked collaboratively with the Scottish Government and NHS Lanarkshire
to develop the new evidence-based accreditation process aimed specifically at local
authorities in Scotland.  A wide range of council services have incorporated breastfeeding
into their delivery in order to positively impact on culture and practice in a way that promotes
long-term progress in breastfeeding.  Changes in this respect have included:
•  Significantly improved employer support through the introduction of a corporate
breastfeeding policy with workplaces set up for women to continue to breastfeed / express
in a private room if required, with refrigeration facilities when returning to work.
•  Establishing nine community breastfeeding champions of mixed gender, who work with
health colleagues in communities to promote and support breastfeeding.
•  All early year’s establishments achieving Breastfeeding Friendly Scotland early learning
and childcare award and 80% of all school establishments achieved Breastfeeding
Friendly Schools award. This includes NHS breastfeeding awareness training, embedding
Page 67 of 326

Page 68

breastfeeding in the curriculum and play environments in nurseries, and a redesign of
early years to promote an environment where breastfeeding is seen as the biological norm
for feeding infants and young children.
•  All new-build facilities, including community hubs, having breastfeeding facilities designed
in at the planning stage.
•  Foster carers completing NHS training on responsive feeding and financial support and
social work staff trained on infant nutrition and benefits of breastfeeding.
•  Libraries, leisure, and sport facilities provide a warm welcome space and facilities for
breastfeeding on site.  
•  Road signage, public buildings, and fleet vehicles have Breastfeeding Friendly Scotland
signage in place. 
(39) Following a consultation exercise, the North Lanarkshire Children’s Service Plan was
developed for 2023 to 2026.  This sets out the shared priorities of the Children’s Services
Partnership that will provide a focus for activities so that collaborative efforts ensure children
have the best start in life and are supported to fulfil their potential.  The delivery of the
Children’s Services Plan centres on community hubs and school clusters where partnership
staff work together with children, young people, and families.  Delivery is supported by
strength and relationship-based practices (that see a child or young person holistically, and
identifies their strengths and assets and the positive factors in their lives) and a trauma
informed approach in order to ensure that children, young people, and families are safe,
healthy, achieving, nurtured, active, respected, responsible, and included. 
(40) The new Towards a Fairer North Lanarkshire Tackling Poverty Strategy for 2023 to 2026 was
approved in September 2023 along with the 2023 Local Child Poverty Action Report with
associated Action Plans.  This sets out the ambition to continue to tackle poverty and child
poverty and builds on actions and positive foundations achieved through the previous
strategy.  The new Strategy:
• Is focused on the key drivers of poverty (increasing income via employment, maximising
income via social security benefits, reducing the cost of living, and holistic supports).  It
sets out an integrated approach to co-ordinating resources across the council (and with
partners) to support effective delivery and ensure fairer outcomes for all local people can
be achieved and sustained. 
• Is a key component of the Programme of Work to 2028 through its intentions to promote
the strengths and skills of individuals and families, increase economic activity, and provide
practical and holistic support (intervening upstream wherever possible to prevent the
longer-term harms associated with poverty). 
• Is supported by the latest Local Child Poverty Action report which sets out the commitment
of the council and NHS Lanarkshire to tackle child poverty across North Lanarkshire’s
communities. Embedded within the Tackling Poverty Strategy, this means that the
partnership approach recognises the importance of holistic supports and the need to
ensure that people and families do not exist in silos where they can often be unaware of
the kinds of support that are available through multiple delivery channels.  A focus on
holistic support to tackling poverty embeds the no wrong door approach to ensure that
those in poverty, and those at risk of falling into poverty, receive the right support at the
right time. 
(41) The main focus of the council’s welfare rights work is to support income maximisation through
provision of direct advice and support for claims, consultation and guidance for fieldwork
staff, representing clients at tribunals and hearings, and supporting specialist social work
services. Successful welfare rights interventions (where individuals are awarded extra
benefit) frequently means that, as a result of increased income, they are better able to
manage their own affairs and may not require further social work services. Successful
outcomes in terms of income maximisation therefore play a vital role across social work
services including those for adults, children and families, justice services, mental health, and
addictions as well as supporting associated health inequalities, housing sustainability, and
community wellbeing, and bringing further income into the local economy.  During 2022/23:  
Page 68 of 326

Page 69

• Council activities generated £35.4m in additional benefit income for the residents of North
Lanarkshire.  
• Activity of the external services commissioned by the council under the new
commissioning model generated £5.2m in additional benefit income for the residents of
North Lanarkshire.
• In cost / benefit terms, for every £1 invested by the council in income maximisation in
2022/23, this generated £27.81 for local residents and the local economy. 
• Advice surgeries within 4 GP practices across North Lanarkshire have provided welfare
rights support to patients referred by the practice.  The project has proven to be successful
since its inception 18 months ago, generating £1.18m. Outreach surgeries are held
monthly in Harthill and since June 2023 in Newmains and St Brigid’s Community Hub. 
(42) A number of focus sessions have been held to highlight / raise awareness of community
wealth building (a people-centred approach to local economic development, which aims to
redirects wealth back into the local economy, and places control and benefits into the hands
of local people) and the role of anchor organisations in this respect.  61 delegates participated
in the session from local public and voluntary sector agencies, as well as Community Boards
and representatives from the business community.  The event kicked off the start of activity
for a shared approach to community wealth building across North Lanarkshire and through
a common understanding of what it means and what work will contribute to its success.  A
community wealth building statement is under development to be embedded across policy
and strategy development areas, and ensure that decision making and practice is developed
through a community wealth building lens. 
(43) Progress through the Programme of Work to date continues to be built upon in respect of
work to Keep the Promise in the areas of care and family support.  The number of care
leavers has more than doubled, support is being provided through an After Care Hub, and a
responsive and bespoke counselling service has been commissioned for care leavers which
is already supporting more than 40 young people.  A website (design with local young people)
is under development to provide access to information and support.  Trauma informed
contextual safeguarding continues to be embedded in the approach to addressing extra-
familial harm; this was an area of best practice highlighted within recent inspection reports
which is being expanding through a current pilot project with two secondary schools.  In
parallel, a successful bid to Corra’s Promise Partnership Fund has been designed and made
to support the launch of a peer mentoring service for young people in conflict with the law. 
(44) Following a consultation exercise, the North Lanarkshire Community Justice Outcome
Improvement Plan was developed for 2023 to 2028.  This sets out the shared priorities of the
Community Justice Partnership in planning and delivering community justice services in a
way that meets the needs of individuals and local communities, prevents and reduces the
risk of further offending, and makes North Lanarkshire safer.  To achieve this the approach
to delivery includes making the appropriate connections with people with lived experience of
the justice system, their families, victims, local communities, third sector colleagues and
stakeholders to listen and learn from their views and opinions. 
(45) Following a recent inspection by Education Scotland, the council’s community learning and
development service has received a positive report that recognises the strong leadership of
community learning and development in North Lanarkshire, as well as a clear vision for
improvement and alignment to the Programme of Work.  It was also noted that the priorities
in the community learning and development plan for 2021-24 reflect the council’s ambitions
for its people and communities, i.e. reducing barriers to participation, engaging children,
young people, and their families in reaching their potential, and improving health and
wellbeing.  The extent of effective partnership working was also recognised in respect of
leading to improved co-ordination of services and reduced duplication.  Two areas of good
practice were identified - these relate to close working relationships between community
learning and development and social work staff which was leading to improved safeguarding
outcomes for children and young people, and a well-embedded approach to accreditation
Page 69 of 326

Page 70

and to growing your own to ensure that barriers to learners accessing training and
employment were removed. 
(46) Over 7,700 children, young people, and adults were directly involved in community learning
and development provision provided by the council in 2022/23.  More than 1,000 young
people have gained accreditations that have included the Duke of Edinburgh’s Award, Youth
Achievement Award, Dynamic Youth Award, and the North Lanarkshire Challenge. 
(47) A multi-disciplinary team of community learning and development, housing, and social
work officers have enabled and supported the resettlement of more than 500 Ukrainian
Displaced Persons in North Lanarkshire, in collaboration with internal and external
partners.  In particular, supporting those accommodated through the Towers Project (funded
by the Scottish Government) which created capacity to accommodate 200 Ukrainian
households within a rapid timescale.  Strong support for integration has seen new arrivals
quickly develop strong support networks and make a contribution to the local community with
many now also finding employment and boosting capacity in priority sectors.  At the same
time the team has continued to support those previously settled through other programmes
as well as young people arriving through the National Transfer Scheme. 
Digital North Lanarkshire 
(48) Implementation of the Connectivity contract is already assisting the transformation of the
area’s digital infrastructure to help ensure that 85% of homes across North Lanarkshire will
have access to gigabit capable broadband earlier than planned. Commsworld are in place
and building a full fibre backbone that traverses all North Lanarkshire’s towns and many
villages.  To date 340 kilometres of ultrafast, full fibre digital network has been laid to support
the delivery of an ultrafast digital network across North Lanarkshire.  Benefits of this new
digital network include:
• New web filtering provisions and a boost to school internet bandwidth via upgrades for
primary school bandwidth to 1Gb and secondary schools to 5Gb with a second resilient
5Gb connection for secondary schools. 
• Providing the capacity to support a free public Wi-Fi network across town centres,
libraries, schools, leisure, and community centres.
• Enhancing the coverage and reach of gigabit-capable fibre networks to businesses,
private, and council-owned social housing.
• Attracting inward investment to local communities from a range of business sectors
resulting in increased access to employment, health, and leisure opportunities.   
(49) Advancements in digital technologies across the council and the establishment of digital as
a channel for interacting with service users, residents, and businesses has continued to
enable the delivery of seamless services and self-serve channels that better meet local
needs and expectations, while reducing manual handling for staff and increasing their
capacity to provide more help and support for those who need it the most.  Processes
implemented in this respect have included:
• Reporting an issue in terms of household waste issue (10 options), missed bin pullouts,
communal bins, special uplifts, recycling centres, booking a van or trailer into a
recycling centre, requesting an additional bin collection, requesting a pull-out service,
and requesting a simplified collection service. 
• Development work to support implementation of Covid business grants for the
discretionary fund, taxi operators, and taxi drivers.  
• Online processes to allow local people to apply for a business waste collection
(including online payment), report an issue with debris or an obstruction, as well as
trees, street cleaning, grass, graffiti, overgrown shrubs / bushes or to request the
removal of broken glass or a syringe.  
• Online services in respect of housing field services repairs scheduling, business waste,
ordering and paying for a grey/recycling/food bin, booking and paying for a special
uplift, cancelling special uplifts online with automatic routing to the refunds team, rents
Page 70 of 326

Page 71

online, debt advice, and waste special uplifts. 
(50) The mass migration of over 4,825 users (employees and Elected Members) was completed
to Microsoft 365 during the pandemic.  Staff across the council are now using its associated
components (Teams, OneDrive, SharePoint) and a range of modern office productivity tools
to enhance everyday working practices and gain efficiencies in productivity and
improvements in ways of collaborating.  One of the key modern office tools that is now
operational is the Business Intelligence Hub which is facilitating a significant move away from
data collection to data management and analysis that adds value and supports decision
making and the identification of areas for improvement.  The development of the Business
Intelligence Hub aligns closely to the continued development of the Data Custodian model
across the organisation and the recently agreed Data Quality Framework which is currently
being rolled out.  Business Intelligence Hub expertise within service areas continues to
develop and embed. 
(51) Three possible locations have been identified as suitable locations for new Immersive
Experience Rooms. This follows work to further develop the proof of concept at Muirfield in
terms of its use and accessibility for a range of establishments and third parties. Procurement
is now complete, and a supplier is ready to commence install.  
• This follows on from the success of the first 5G-enabled immersive classroom in Scotland
which went live at Muirfield Community Centre in Cumbernauld. This saw a room
transformed into an exciting and engaging learning environment to give children, young
people, and wider community users a 360-degree digital experience.  Users experience
what it’s like to be in outer space, under the ocean, on a World War 1 battlefield, or even
on top of Everest thanks to this learning initiative which was the first of its kind in the UK.
• More recently, Motherwell Library has celebrated a significant upgrade following an
extensive refurbishment programme which means visitors can enjoy a range of brand-
new facilities which includes Scotland’s only interactive immersive pod in a public library. 
The £1.6m investment has also seen the children’s area doubled, new flexible learning
and meeting areas created, and the opening of a new MakerSpace (an area designed to
help people develop skills, explore their creativity, and learn how to use new digital and
craft resources including 3D printers, sewing machines and a laser cutter). 
(52) A new technical team has been established to support the health and social care workforce
in the use of enhanced technology solutions and assessment and planning with regards to
safe-tech solutions.  The team supports locality teams to maximise the use of innovative
technology enabled care and to review the support arrangements for existing clients,
considering the potential use of technology enabled care solutions to support better and more
independent living. 
(53) A Digital School was established to promote and enable digital learning across North
Lanarkshire by supporting schools and families on how to use the digital tools available and
establishing a digital pedagogy that engages learners and delivers a high-quality learning
experience for all.  The use of digital technology in this way aims to enrich learning and
teaching, raise levels of attainment, and close the attainment gap.  Schools and centres are
supported to gain Digital Schools Award Scotland Status with 43 accredited establishments
across North Lanarkshire and plans in place to increase this number. 
(54) A Virtual Classroom (containing high quality, moderated e-learning resources) was launched
in January 2021 to provide an online and interactive platform for young people; this includes
learning areas such as literacy, numeracy, STEM (science, technology, engineering, and
mathematics), and health and wellbeing.  Since its launch the virtual classroom has been
refreshed with an overhaul being completed to the existing provision to tie in with the new
progression pathways and include new focussed computer science content.  The virtual
classroom now contains the new Tech Tuesdays resources - 6 new videos released every
week - that focus on pre-recorded lessons to support pathways.  In addition to broad and
general teaching and learning materials, the virtual classroom hosts a large range of videos
Page 71 of 326

Page 72

and materials which support young people’s pathways into work.  To date the virtual
classroom contains almost 4,000 accessible resources and has achieved over one million
visits.   
(55) The new North Lanarkshire Progression Pathways for early to third level have now been
launched, with the Digital School tracking its impact.  Early to third level progression
pathways in literacy, numeracy, and digital learning have been developed to support teacher
planning and professional judgement. The programme of study in literacy at second level has
been revised, with professional learning offered to literacy champions in all establishments
to support professional understanding.  Digital pedagogy practitioners provide regular, high-
quality professional learning, with most schools and all family learning centres being
supported by the digital team. 
(56) Two Intergenerational digital skills courses were delivered on the use of iPads - in Drummond
Drive Retirement Complex with pupils from Thornlie Primary and at James Dempsey
Gardens Retirement Complex with pupils from Greenhill Primary.  This increased the digital
abilities of the tenants, reducing social isolation and improving pupils’ confidence and social
skills. 
(57) The Digital sub-group continues to meet monthly with the Chair and Vice Chair having been
voted in for another year.  Latest consultations have included work with Commsworld as part
of the SmartNL programme to shape what community benefits will look like for local
communities in the future.  This group plays a key role in providing the interface between the
council and the public for all things digital. 
(58) Through the UK Shared Prosperity Fund, the investment plan for North Lanarkshire includes
funding for a range of digital support for people, businesses, and communities. Key provision
includes:
• A Digital Communities Challenge Fund which has been developed to support community
organisations to improve their digital connectivity is scheduled for launch in early 2024. 
• Grant support for businesses through the Business Growth Fund up to £50K which can
be used for digital skills, consultancy, and capex and infrastructure support for digital
transformation projects through the adoption and integration of digital technologies and e-
commerce. 
• Expert help of up to five days support for digital projects, to build skills and capabilities
that increase digital knowledge and provide support with digital marketing that covers
areas such as social media platforms, website content and design, data analytics, and
search engine optimisation.
• Funding to continue the delivery of Smart Hub Lanarkshire, a centre of excellence for
manufacturing innovation and robotics established to support small to medium sized
enterprises active in the manufacturing sector locally.
• The provision of digital skills training to support the North Lanarkshire Digital Skills
Academy. This includes support for the establishment of community based Digital Labs  to
provide local adults aged 16+ with the relevant skills, confidence, and motivation to get
online, a North Lanarkshire Digital Youth Academy aimed at 16-24 year olds, and support
to co-ordinate digital career pathways.
• Establishment of an interactive digital heritage and countryside trail to enhance the visitor
experience across North Lanarkshire. 
One Service 
(59) The Leadership and Operating Model continues to ensure that a unified approach is
underway to maintain effective management, operation, and governance structures within
each Hub.  The model aims to ensure that Town and Community Hubs operate as a single
entity and support a much wider integrated community offer - with communities having more
direct access to the services they need and staff closer to the communities they work in.  This
unified approach puts communities at the heart of the council’s model and seeks to ensure
Page 72 of 326

Page 73

everyone is given equality of opportunity and individuals are supported, encouraged, and
cared for at each key stage of their life. 
(60) 7 community hubs have been operationalised following both the reconfiguration of existing
assets and handover of new development hubs, with learning being taken forward in the
transition towards the council’s future operating model as well as the design of new
development hubs and council service redesign to support a much wider integrated
community offer. 
(61) All council services are now fully engaged in phase 2 Leadership and Operating Model plans
for the council to transition towards the longer-term operating model.  This work will progress
through deep dive operating model service reviews post budget decisions and in line with
the capital programme award to develop enabling infrastructure. 
(62) Working in partnership with the North Lanarkshire Health and Social Care Partnership, the
council has achieved all deliverables and phase 1 deadlines set out by the Scottish
Government relative to the national framework for Getting it Right for Everyone (GIRFE) tied
to the place-based approach and underpinning the vision for town and community hubs. 
(63) The commitment to be a trauma informed organisation has been progressed by adopting a
trauma lens approach to new development hubs and the reconfiguration of existing assets
with a measurement framework aligned to the Equality Strategy to be introduced from 2024. 
(64) A new framework has been introduced, based on best practice and guidance from Sustrans,
to promote active travel within the workforce.  A survey currently underway with all staff will
inform forward plans and priorities that support delivery of the Active Travel Strategy to 2031. 
(65) Work is under development to progress a Corporate Telephony Solution and introduce a
single contact number and secure payment portal for the council.  This will enhance the
overall citizen experience and grow the Customer Services Hub underpinning the future
operating model.   
(66) A refreshed hybrid working model has been developed to enhance the council’s approach to
building a vibrant, mixed use, office and community-based workplace environment in the
transition to the future operating model.  This will support the council in meeting desired
performance and productivity expectations while supporting fair work ambitions. 
(67) Detailed service workforce plans are now in place for each service area to help tackle the
demographic challenges faced historically, and provide an opportunity to consider service
planning in line with building a future workforce and transitioning the workforce to align with
the Programme of Work to 2028 and future operating model. 
(68) Following the introduction of a new approach to auditing Best Value, the key findings from
the council’s first audit report were extremely positive.  This considered the effectiveness of
the leadership of the development of the council’s strategic priorities which was undertaken
as part of a national approach to thematic aspects of the Best Value audit requirements.  The
auditors noted that the council has a clear ambitious vision as detailed in The Plan for North
Lanarkshire which has been driven by effective leadership and is supported by a range of
performance indicators and performance reporting arrangements. The report concludes
positively on the council’s approach to citizen and community engagement and recognises
the council’s commitment to reducing inequalities and tackling poverty. The report also
comments positively on the alignment of strategic and operational delivery plans (with the
council’s financial, asset, and digital plans), the collaborative working between Elected
Members and officers, and the council’s approach to self-evaluation which supports
continuous improvement. 
Page 73 of 326

Page 74

Page 74 of 326

Page 75

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref KH/SL Date 14/03/24 
Strategic Performance Framework - the North Lanarkshire context 
From  Katrina Hassell, Chief Officer (Business and Digital)  
E-mail HassellK@northlan.gov.uk Telephone 07903 096 121 
Executive Summary
The Plan for North Lanarkshire is supported by a suite of high-level Health Check Indicators
that collectively provide the context for North Lanarkshire as a place. 
By providing the local demographic, social, and economic profile these indicators were key
to shaping the long-term vision set out in The Plan for North Lanarkshire when it was
approved in 2019, and they have continued to provide a robust, consistent, and
independent way of assessing progress since then.  The suite of indicators has also played
an important role in terms in informing the council’s strategic planning process through the
Programme of Work.   
Most of the latest results for each of the 28 indicators now reflect a period towards the end,
or in the aftermath, of the pandemic.  This has enabled a much clearer interpretation of the
impact of the pandemic on what The Plan for North Lanarkshire set out to achieve when it
was established.  The impact can be seen in much of the data for the years 2020 and 2021
(the pandemic years) compared to 2019 (pre-pandemic) and 2022 and 2023 (the aftermath
of the pandemic).  Notwithstanding this, there remains significant gains when comparing
the latest results available to the baseline set when The Plan for North Lanarkshire was
established in 2019.   
The latest results show positive trends in a number of key economic and social indicators,
including:  
• Gross weekly pay continues to remain higher than the national average and the gap in
the hourly rate of pay between males and females continues to narrow and is now
smaller than it is nationally.  
• The number of working age people claiming employment related benefits has continued
the gradual downward trend that was first experienced towards the end of 2020 and is
now 7% lower than pre-pandemic levels.  
• The proportion of the working age population who are economically active has shown
signs of improvement for the last four consecutive quarters in a row, reaching 75%, the
highest position for the last three years after much fluctuation.  
• Economic growth continues to show a positive picture with the latest results showing an
increase of 5.2% in gross value added per head.
• Latest figures show a significant improvement in breastfeeding, with 30.4% of babies in
North Lanarkshire breastfed at the 6-8 week review and getting the best start in life.  
• The change in crime rates in North Lanarkshire remains lower than the national average. 
Item 6
Page 75 of 326

Page 76

1. Background 
1.1 Since The Plan for North Lanarkshire was established in 2019, it has been supported
by a suite of 28 Health Check Indicators from the Strategic Performance Framework
which aim to collectively provide the context for North Lanarkshire as a place.   
1.2 This suite of measures has been used constantly to provide a robust, consistent, and
independent evidence base to (a) inform strategic planning and delivery priorities, and
(b) demonstrate progress in delivering the Programme of Work and achieving the vision
of inclusive growth and prosperity for all as set out in The Plan for North Lanarkshire. 
1.3 In practice, these measures:
• Are long-term measures whose role is to assess the state of a nation, i.e.
North Lanarkshire.  As it can take time to see the impact that outcome focused
planning has for people and communities, maintaining a consistent approach to
measuring progress and reviewing and reporting the results helps to ensure the
focus remains steadfast on what The Plan for North Lanarkshire aims to achieve. 
This approach avoids the temptation to resort to short-term measures that don’t
help sustain the long-term focus required to achieve the long-term vision.
• Aim to provide a high-level impact assessment of the work of the council and
partners on North Lanarkshire’s economy, its people, and its communities.  It is
recognised though that the long-term nature of some investments, time-lags from
investment to seeing results, and the need to make assumptions of impact
(comparing, for example, scenarios that consider impact if there had been no
portfolio of council activity delivered at all) need to be taken into account in this
assessment.
• Comprise a small number of wider landscape measures which focus, where
possible, on outcomes rather than outputs.  In doing so it is recognised that it is
not easy to measure outcomes, or to separate out specific impacts on outcomes
While these trends are particularly significant, challenges remain thus further supporting
the reframed Programme of Work to 2028 (approved by the Policy and Strategy Committee
in March 2023) to ensure a heightened and more strategic focus on not only sustaining the
economic and community aspects that are enabling local people and communities (and the
place that is North Lanarkshire) to thrive, but also on ensuring a more targeted approach
to improving social conditions and outcomes. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Are aware of the key role that the Health Check Indicators play in providing the place-
based evidence base from which progress in delivering The Plan for North
Lanarkshire can be regularly assessed, and
(2) Take cognisance of the latest results set out in Appendix 1 and the successes and
challenges summarised in paragraphs 2.4 and 2.5 respectively. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Page 76 of 326

Page 77

in terms of improving people’s lives as there are many factors in this respect that
are outside the direct control of the council.  
• Are sourced from externally produced statistics, i.e. they are not statistics
calculated by the council and as such they provide an external and independent
verification.
• Are available nationally to enable a comparison of North Lanarkshire’s
performance against other local authorities and the national average. 
1.4 In previous years, updated results for the suite of 28 Health Check Indicators were
included in the annual Programme of Work report to the Policy and Strategy
Committee.  A new approach was introduced in March 2023 through a separate report
on the agenda which aims to better show the results of these indicators within the most
appropriate context (for example trends over time that cover before, during, and in the
aftermath of the pandemic and supplementary measures, commentary, and analysis
for added interpretation).   
1.5 This report herewith therefore continues the practice established in 2023 with a
separate report that sets out the current North Lanarkshire context. As well as
demonstrating the change in performance from the baseline set at the time when The
Plan for North Lanarkshire was established, this year’s report does an even deeper
dive into the data and trends that sit underneath the 28 Health Check Indicators in order
to ascertain the underlying factors that will be key to informing the delivery of the
Programme of Work to 2028. 
2. Latest results 
2.1 The suite of 28 Health Check Indicators has been updated with the most recent data
published and available; this data and the latest commentary on the North Lanarkshire
context is set out in Appendix 1.  Note, to aid interpretation and ensure the results are
reviewed within the appropriate context, the indicators depicted in Appendix 1 are not
set out sequentially, rather they are set out in clusters where there are clear linkages
to consider.  A contents page (with quick links) is included in Appendix 1 to provide a
means by which to easily navigate through each of the indicators. 
2.2 The latest results for the 28 Health Check Indicators set out in Appendix 1: 
• Are presented to show the North Lanarkshire position within the relevant context,
such as family group or national averages.    
• Include graphs displaying a long-term time series (where available) in order to
show, for example, trends over time that cover before, during, and in the aftermath
of the pandemic.  Note, some national data sources recalibrate their time series at
every publication, where this is the case the most up to date data is reflected in the
results presented in the Appendix.
• Incorporate supplementary measures, commentary, and analysis, where
appropriate for added interpretation. This year’s much deeper dive into the 28
Health Check Indicators, and the underlying measures supporting them, aims to
clearly show the North Lanarkshire context in more specific detail.  
• Reflect the baseline for The Plan for North Lanarkshire in the North Lanarkshire
commentary.  This baseline was established using the most up to date data
available at the time The Plan for North Lanarkshire was approved and monitoring
began.  This allows for improvements to be identified over the lifespan of the
council’s corporate strategy. 
2.3 Even with a time lag in some nationally published data, the latest results for most
indicators now reflect a period towards the end, or in the aftermath, of the pandemic. 
Page 77 of 326

Page 78

This has enabled a much clearer interpretation of the impact of the pandemic which
can be seen in much of the data for the years 2020 and 2021 (the pandemic years)
compared to 2019 (pre-pandemic) and 2022 and 2023 (the aftermath of the pandemic). 
Notwithstanding this, there remains significant gains when comparing the latest results
available to the baseline set when The Plan for North Lanarkshire was established in
2019.   
2.4 For the small number of indicators which are measured quarterly, this data continues
to show a number of significant and positive trends that are encouraging.  These
successes are even more noteworthy given the challenging backdrop they have been
achieved against.  The following represents a high-level summary of key successes
where new data has been available to provide an updated position in this year’s report. 
• Last year’s annual performance update reported that, for the first time ever, the
gross weekly pay for local residents was higher than the national average, as
shown in Figure 17a in Appendix 1.  This position continues in the latest data in
this year’s update which shows the gross weekly pay for North Lanarkshire’s
residents has reached £705.70 in 2023 compared to £702.40 nationally; a
difference of £3.30 per week.  Gross weekly pay in North Lanarkshire has
increased 7% (£47.80 per week) over the year.  Figure 17c shows that the gap in
hourly pay for males and females has significantly narrowed over the period of The
Plan for North Lanarkshire (from £2.36 to £1.22 per hour), with this gap now being
narrower than it is nationally.
• The number of working age people claiming employment related benefits has
continued the gradual downward trend that was first experienced towards the end
of 2020 and is now lower than pre-pandemic levels.  Latest figures show 7,320
claimants in North Lanarkshire, while this is only a 7% decrease from the
December 2019 claimant count of 7,890 it does not reflect the impact of the
pandemic years when claimant counts were 14,195 as at December 2020 and
9,580 as at December 2021 (Figure 20b in Appendix 1).  The current claimant rate
in North Lanarkshire is 3.3% which is a decrease from pre-pandemic levels of 3.6%
in 2019 (Figure 20a in Appendix 1); the national average is 3% down from 3.2%
over the same period.
• Figures 18a and 18b in Appendix 1 show that the proportion of the working age
population who are economically active has shown signs of improvement for the
last four consecutive quarters in a row, reaching 75%, the highest position for the
last three years after much fluctuation.  This represents 171,100 residents
economically active in North Lanarkshire, this is an increase from March 2020
(170,700) albeit figures have not yet returned to the pre-pandemic level in 2019
(174,000).
• Prior to the pandemic, North Lanarkshire had one of the strongest and fastest
growing economies in Scotland, with significant growth over the last 10 years and
strong business growth with an increase in the number of businesses per head of
population and jobs safeguarded through support to businesses.  Recent figures
(Figure 16a in Appendix 1) show the local economy continues to grow with North
Lanarkshire’s growth rate increasing significantly from the previous year (Figure
16b in Appendix 1). 
• Latest figures show a significant improvement in breastfeeding with 30.4% of
babies in North Lanarkshire breastfed at the 6-8 week review and getting the best
start in life (Figure 09a in Appendix 1).  This is an improvement from the previous
year (26.6%) and The Plan for North Lanarkshire baseline of 23.1% in 2017/18. 
• The change in total recorded crime shows a small increase from the previous year
of 0.6% compared to a 1% increase nationally (Figure 06a in Appendix 1). 
Notwithstanding the impact of the pandemic on the number of recorded crimes,
this remains a positive position in that the number of crimes in North Lanarkshire
Page 78 of 326

Page 79

recorded by the police has not returned to pre-pandemic levels and remains lower
than The Plan for North Lanarkshire baseline (figure 06b in Appendix 1). 
2.5 Previous annual performance reports to the Policy and Strategy Committee (in March
each year) have provided commentary which reflected on the impact of the pandemic,
and the resultant social and economic effects which were considered to have affected
vulnerable people and communities more intensely.  As a result it was considered there
was a danger that already unacceptably high levels of deprivation and child poverty
would become further exacerbated. These updates also reflected on the very real
challenges facing the future sustainability of the local economy.  When the data in
Appendix 1 is reviewed and considered in its entirety, it would suggest that while there
are significant signs of potential recovery from the pandemic with an encouraging move
in the right direction in many indicators, there are challenges that remain:   
• While improvements had been noted in a reduction in the proportion of children in
poverty over the period of The Plan for North Lanarkshire (Figure 22a in Appendix
1 shows the decrease from 25.2% to 23.2%), the latest figures show a reversal in
this respect with rates now reaching 26.6%.  While this change in trend is in line
with the national average, it remains a concern as almost one in four children in
North Lanarkshire are living in poverty.  This is higher than the national average of
just over one in five children.  Of particular concern is the disparity across North
Lanarkshire’s communities.
• While Figures 18a and 18b in Appendix 1 show that the proportion and number of
the working age population who are economically active has shown encouraging
signs of improvement, the deep dive in this respect shows that there remains
45,000 people who are currently recorded as being economically inactive and not
wanting a job (an increase from  36,800 pre-pandemic in 2019), with 37% of these
recorded as long term-sick, 30% students, 10% looking after family / home, and
10% retired.  81% are recorded as not wanting a job.  Following varying trends,
Figures 18g and 18i in Appendix 1 shows a significant increase in the number of
students over the period of The Plan for North Lanarkshire (from 13,100 to 16,700),
as well as those long-term sick (from 15,800 to 20,600).
• Figure 21a in Appendix 1 had clearly shown an ongoing downward trend up to
2020/21 in terms of a reduction in the number of the working age population with
no qualifications (to 12.8%, which was around 27,600 people).  The latest figures
show a reversal of this trend to 18.6% in 2021/22 which equates to 40,100 of North
Lanarkshire’s working age population in a situation that restricts their ability to
access developing employment opportunities. This significant change was
examined in more detail at source, and nothing was found to be impacting on the
data other than perhaps the size of the sample in the survey.  However, to ensure
ongoing accuracy in reporting the data for this indicator this will continue to be
examined and monitored. 
• Figures 11a and 12a in Appendix 1 show ongoing improvement in terms of
educational attainment for all pupils gaining 5+ awards at level 6, as well as pupils
living in the 20% most deprived areas.  However, the gap in attainment (Figure 12b
in Appendix 1) in this respect is not showing any significant signs of narrowing.
• The deep dive into the latest business survival rates in North Lanarkshire shows a
varying position and a decrease to 54% from 58% in the previous year, albeit this
trend does follow the national average (Figure 19a in Appendix 1).  The deep dive
into this data shows that the early years of implementing The Plan for North
Lanarkshire was impacted by the pandemic.  However, active businesses in North
Lanarkshire still remains high though as the latest figures show 7,920 businesses
(Figure 19b in Appendix 1), an increase over the period of The Plan for North
Lanarkshire from 7,885.  In addition, over the period of The Plan for North
Lanarkshire, the number of abroad-owned registered private sector businesses in
Page 79 of 326

Page 80

North Lanarkshire has increased from 310 in 2018 to 385 in 2023.  This inward
investment had a positive impact on Scottish employment, adding around 1,100
jobs.   
Next steps 
2.6 By collectively providing the local demographic, social, and economic profile, the suite
of Health Check Indicators were key to shaping the long-term vision set out in The Plan
for North Lanarkshire when it was established in 2019.  As such, these indicators will
continue to be regularly monitored, assessed, and reported in order to provide a
consistent mechanism to assess progress in delivering The Plan for North Lanarkshire
through incremental short-term changes and impacts, while maintaining a focus on
improving outcomes in the long-term.  Moving forward a six-monthly interim update will
be incorporated into Programme of Work reporting to the Policy and Strategy
Committee, to complement the annual report and deep dive in cycle 1 each year. 
2.7 The suite of Health Check Indicators will continue to play an important role in informing
delivery of the Programme of Work to 2028 to ensure that the stubborn scale of
deprivation in areas that are hardest to reach is targeted with future policy
developments focused on tackling economically inactive trends and improving social
conditions. 
2.8 One of the most significant enablers to the success of The Plan for North Lanarkshire
is that North Lanarkshire maintains a balanced, growing, and healthy population that is
supported by net inward migration. Currently North Lanarkshire’s population is
projected to increase by 0.3% to 2028 and thereafter decline by 1.2% to 2043, with
reductions in both the under 15 and working age populations, compared to a substantial
increase in the number of people of pensionable age. The impact of such
demographical change will erode the supporting working age resource base and
increase the dependency ratio (i.e. those aged under 16 + those of pension age
compared to those of working age).   
2.9 As the extent of the demographical change will add significant challenges in delivering
the Programme of Work to 2028, it is important to ensure that activity continues to
impact positively on population balance and growth. It had been the intention to provide
a stratified population target for North Lanarkshire within this report to allow the impact
of the Programme of Work to be tracked over time and the Delivery Plan to be
recalibrated accordingly. However, following initial outputs from the 2022 Census which
were received towards the end of 2023, work is underway nationally to update the
population projections using the Census data as the base; these are expected to be
published in the spring of 2024.  These projections will provide an updated picture in
terms of the structure of North Lanarkshire’s current and future population (i.e. the
proportion of the population under 15, of working age, and of pensionable age).  To
ensure as up to date a picture is available to inform the approach to determining the
future requirements of North Lanarkshire’s population, a further update in this respect
will be provided to the Policy and Strategy Committee at the six-monthly update point. 
3. Measures of success 
3.1 Measures of success will be evidenced through progress being made to deliver the
Programme of Work and ensure the council’s portfolio of programmes, projects, plans,
and activities impact positively on the North Lanarkshire context (evidenced through
the 28 Health Check Indicators) and the achievement of inclusive growth and prosperity
for all (as set out in The Plan for North Lanarkshire). 
Page 80 of 326

Page 81

4. Supporting documentation 
4.1 Appendix 1:  Latest results and the North Lanarkshire commentary. 
Katrina Hassell
Chief Officer (Business and Digital) 
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The Local Government Act 1992 established the role of the Statutory Direction to
direct the “publication of information as to standards of performance”.  
The Local Government in Scotland Act 2003 introduced the duty of Best Value; this
requires that councils “make arrangements to secure continuous improvement in
performance”.  
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
Page 81 of 326

Page 82

data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Improvements in the presentation of performance information to various audiences
are being advanced in line with the development of the DigitalNL work package for
the Business Intelligence (BI) Hub. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Ensuring an evidence based approach to strategic planning and performance
monitoring and reporting contributes to the mitigation of the risks on the Corporate
Risk Register for managing strategic change and governance, leadership, and
decision making.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
Page 82 of 326

Page 83

age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 83 of 326

Page 84

Strategic Performance Framework: the North Lanarkshire context
as at March 2024
Appendix 1
Page 84 of 326

Page 85

Indicator
click on links
below for easy
access to each
indicator
Page
number
C17: Gross weekly pay - residents (full-time employees) link to page 3
C16: Gross Value Added - growth per head (income approach) link to page 3
C18: Economically active - % of all people economically active (aged 16-64 years)  link to page 4-5
C20: Benefits - % of working age people (aged 16-64 years) claiming one or more of the key benefits link to page 6-7
C19: Businesses - % of the VAT / PAYE registered businesses that survive for at least three years link to page 8-9
C27: Employment - total employment in sustainable tourism as % of growth sector employment link to page 10
C28: Gross Value Added - per head in sustainable tourism (employment) link to page 10
C11: Educational attainment - % of pupils gaining 5+ awards at level 6 link to page 11
C12: Educational attainment - % of pupils living in 20% most deprived areas (as defined by the SIMD) gaining 5+ awards at Level 6 link to page 11
C13: Post school destinations - % of pupils entering positive destinations link to page 12
C21: Qualifications - % of the working age population (aged 16-64 years) that have no formal qualifications link to page 13
C14: School exclusion rate per 1,000 pupils - all children link to page 13
C15: School exclusion rate per 1,000 pupils - looked after children link to page 13
C22: Poverty - % of children in poverty after housing costs link to page 14
C10: Child wellbeing - % of children reviewed at 27 to 30 months with no concerns recorded link to page 14
C09: Breastfeeding - % of babies breastfed at 6-8 week review (overall rate) link to page 15
C23: Life expectancy at birth - estimates (males and females) link to page 15
C24: Independent living - % of adults supported at home who agreed that they are supported to live as independently as possible link to page 16
C25: Quality of life - % of adults supported at home who agree their services and support had an impact on improving or maintaining their quality of life link to page 16
C26: Carers - total combined % of carers who feel supported to continue in their caring role link to page 16
C06: Crime - % change in total recorded crime link to page 17
C05: Household waste - % recycled link to page 17
C07: Rating of neighbourhood (includes all neighbourhoods) - % good / very good ratings link to page 18
C08: Rating of neighbourhood as a place to live (includes only the 20% most deprived neighbourhoods, as defined by the SIMD) - % good / very good ratings link to page 18
C04: Housing - estimated housing by tenure link to page 19
C03: Net migration - total rate per 1,000 population link to page 20
C01: Population projections - % change link to page 20
C02: Population - mid-year estimates (mye) link to page 20
Contents
Page 85 of 326

Page 86

C17: Gross weekly pay - residents (full-time employees)
Measuring this indicator will tell us if we have:  Increased the earnings of people who live in NL
What success looks like:  Earnings for people who live in NL continue to grow on a par with national levels
The North Lanarkshire commentary:
• Gross weekly pay for NLs residents became higher than the average earnings for Scotland and GB for the first
time ever in 2022; latest results shows this positive position remains in 2023 (as shown in Figure 17a above).
• In 2022, gross weekly earnings for NLs residents was £657.90 (based on all full-time workers), this increased to
£705.70 in 2023; an increase of 7% (£47.80) over the year.
• In comparison, the national average increased by 9.5% (£61.10) from £641.30 in 2022 to £702.40 in 2023.
• Traditionally, while wages have risen steadily for the people who live in NL, this had previously been at a lesser
rate than average earnings for Scotland and GB.
• The Plan for North Lanarkshire baseline set in 2018 saw gross weekly earnings to be £545.70; at the time this
was £17 lower than the national average of £562.70.
• Prior to this the widest gap in average earnings for NL compared to Scotland was £42 in 2009 before the gap
reduced to its narrowest point in 2019 (£11.10) just before the pandemic.
• Figure 17b above shows the current difference between the average gross weekly pay in NL compared to
Scotland, which has improved over the period of The Plan for North Lanarkshire from £17 lower to £3.30 higher.
• For added context, the average hourly pay of full-time workers in NL (excluding overtime) increased £1.81 from
£17.62 per hour in 2022 to £19.43 per hour in 2023.  This compares to a £1.90 increase nationally from £18.33
to £20.23 per hour over the same period.
3
C16: Gross Value Added - growth per head (income approach)
Measuring this indicator will tell us if we have:  Increased NLs economic output
What success looks like:  Continued economic growth in NL
The North Lanarkshire commentary:
• The latest data published shows that GVA growth remains positive
suggesting NLs economy continues to grow, this follows a dip in the previous
year which mirrored the national position (as shown in Figure 16a above).
• Looking at the baseline for The Plan for North Lanarkshire, GVA per head of
population at current prices shows that NL has seen a rise of 14.6% from
£20,637 in 2016 to £23,651 in 2021, compared to an increase of 10.3%
nationally over the same period.
• Figure 16b above displays the % change in economic growth from one year
to the next  - the historical trends for the last 10 years and beyond not only
show a positive trend (which has continued over the period of The Plan for
North Lanarkshire), it also shows economic growth in NL has steadily
remained above the national average. 
• The latest data shows a 5.2% increase in GVA per head in NL from 2020 to
2021 which reverses the previous year's declining figure of -3.7% and starts
to return the level of growth to the pre-pandemic position of 6.6%. 
• The position nationally over the same period shows current growth of 6.6%
which reverse the previous year’s declining figure of -4.5% and is an
increase from the pre-pandemic position of 4.2%.
• While there is a time lag in the availability of these results, the period
covered by this data is starting to reflect the impact of the pandemic and its
aftermath.  This position will continue to be monitored.
• Notes: This measure uses the income approach which allocates income to
the region in which the economic activity takes place.  The data in this entire
time series is rebased and recalculated each year at current basic prices
when new results are produced. 
• On average the current hourly pay for males in NL is £19.98
compared to £18.76 for females (and compared to £20.88
and £19.52 nationally for males and females respectively).
• Figure 17c shows the gap in average hourly pay for males
compared to females which has significantly narrowed over
the period of The Plan for North Lanarkshire from £2.36 per
hour to £1.22 per hour (compared with a gap nationally from
£2.44 to £1.36 over the same period).
link to contents page
• The gap between the average hourly pay for males and females in NL has now been smaller than it is nationally
for the last two years.
• Notes: All data above is derived from a single annual survey of hours and earnings; it therefore represents a
sample of the population.
Page 86 of 326

Page 87

C18: Economically active - % of all people economically active (aged 16-64 years)  
Measuring this indicator will tell us if we have:  Increased the number of NLs residents in employment
What success looks like:  More people aged 16 to 64 living in NL are economically active and contributing to the local / national economy
The North Lanarkshire commentary:
Economically active:
• Figure 18a above shows not only a period of relative stability over the 10 years prior to 2020, but also that the % of people economically active in NL exceeded the national average at times.  This
period included the 2018 baseline for The Plan for North Lanarkshire and shows that NL figures continued to follow the national average throughout 2019 and into early 2020.
• In 2020 this indicator started to show a decline from 77.2% and remained unsteady before reaching its lowest point to date as at September 2022 (68.8%); the timing of this suggests figures were
impacted by the pandemic.
• In 2021 and 2022 small gains were recorded, but the most noticeable gain has been an increase for 4 consecutive quarters from 68.8% as at September 2022 to 75% as at September 2023. 
Changes in the proportion of people economically active in NL over this time mirror the trend in the national position, albeit national gains were smaller with an increase from 77.2% to 77.9% over the
same period. 
• The latest result as at September 2023 equates to 171,100 residents economically active in NL (Figure 18b above); this is an increase from March 2020 (170,700) but figures have not yet returned to
the pre-pandemic level in 2019 (174,000).
• Notes: A person's economic activity is derived from their activity last week; people who are economically active are those who are either in employment or unemployed (but actively looking for work,
waiting to start a new job, or available to start a new job). The trends in this indicator should be considered alongside indicator C20 for the % of working age people claiming benefits.
Economically inactive:
• There are many other factors which contribute to a full analysis of employment in NL, one is economic inactivity.  Figure 18c above shows a steady trend from 2009 to 2019, but an increase from
21.9% in 2019 to the highest to date of 31.2% as at September 2022, before dropping to 25% as at September 2023. 
• Figures 18d above shows this equates to 47,700 people in 2019, increasing to 69,100 as at September 2022, and decreasing to 55,100 as at September 2023.
• Figure 18e above shows the proportion of people economically inactive that do not want a job has increased from 80.9% to 81.6% over the period of The Plan for Lanarkshire with varying
fluctuations in the data over the years in between.  Figure 18f above shows that over the period of The Plan for North Lanarkshire this represented an increase from 39,400 to 45,000 people.
• Figure 18e shows much greater fluctuation in the data for the % economically inactive compared to the national average which currently sits at 81.8%.
• Notes: Economically inactive people are those who are neither employed nor unemployed; they're not in paid work, but they're also not looking for a job or available to start work. A person might be
economically inactive for a number of reasons, such as being retired, a student, or too ill to work.
This analysis continues on the next page / …
4
link to contents page
Page 87 of 326

Page 88

The North Lanarkshire commentary:
• The latest figures show that of those economically inactive, 10% are retired, 14% are looking after home/family, 30% are students, 37%
are long-term sick, with the remainder classed as other.  Of those recorded as economically inactive, 81% don’t want a job.  The trends in
respect of students, those retired, long-term sick, and those looking after family / home are summarised below.
- For students (Figure 18g), the trend has been more varied increasing from 11,000 people in 2019 to 15,200 as at March 2021 before
decreasing to 9,600 as at March 2022 and then an almost continual upward trend to 16,700 as at September 2023.  Over the period of
The Plan for North Lanarkshire the number of students has increased from 13,100 to 16,700, again with significant fluctuations over that
time.
- For those retired (Figure 18h), there was an increase from 5,900 people in 2019 to the highest point of 9,800 as at December 2021,
before this has seen an almost continual downward trend to 5,300 as at September 2023.  Over the period of The Plan for North
Lanarkshire the number of people retired has increased from 4,300 to 5,300, with significant fluctuations over that time.
- For long-term sick (Figure 18i), there was an increase from 14,900 people in 2019 to the highest point of 29,800 as at December 2021,
before this has seen an almost continual downward trend to 20,600 as at September 2023.  Over the period of The Plan for North
Lanarkshire the number of people long-term sick has increased from 15,800 to 20,600, with some fluctuations over that time.
- For looking after family / home (Figure 18j), there was an increase from 8,500 people in 2019 to the highest point of 17,500 as at June
2021, before this has seen an almost downward trend to 7,600 as at September 2023.  Over the period of The Plan for North Lanarkshire
the number of people retired has decreased from 9,700 to 7,600, with some fluctuations over that time.
• Notes: People who are economically inactive are those not in employment and who do not meet the criteria for unemployment; this group
includes those who want a job but who have not been seeking work in the last 4 weeks, those who want a job and are seeking work but not
available to start, those who do not want a job, and those in retirement.
5
/ continued from the previous page …
Self-employed
• Figure 18k shows that the number of people who are self-
employed in NL as a proportion of the working age population
was 7.8% in 2019, prior to the pandemic.
• Self-employed rates then experienced an almost continual
downward trend to 3.7% as at  December 2021.
• Since December 2021 figures have fluctuated, reaching a high of
6.6% as at December 2022 before dropping to the latest figure of
4.2% as at September 2023.  This compares to 7.7% nationally.
• These rates account for 18,000 people in 2019 dropping to 9,800
as at December 2021.  This fluctuation continued with 14,900
people self-employed as at December 2022, before dropping to
10,900 as at September 2023.
• As shown in Figure 18m, over the period of The Plan for North
Lanarkshire the number of people self-employed has decreased
from 17,800 to 10,900, with significant fluctuations over that time.
• Notes: Self-employed are those people who regard themselves
as self-employed, i.e. where is their main employment, whether
or not they have employees.
link to contents page
Page 88 of 326

Page 89

C20: Benefits - % of working age people (aged 16-64 years) claiming one or more of the key benefits
Measuring this indicator will tell us if we have:  Reduced the number of residents reliant on employment related benefits
What success looks like:  All of NLs residents capable of working are sustaining employment
The North Lanarkshire commentary:
Overall claimant count
• In the years prior to The Plan for North Lanarkshire baseline of 3.5%
in December 2018, claimant count for NL had remained relatively low,
increasing only to 3.8% in March 2020.  April 2020 figures clearly
showed the immediate impact of the pandemic with a rise to 6.1% in
NL compared to 5.4% nationally; figures continued to increase to a
high of 7.2% in August 2020 which was in line with trends nationally.
• After August 2020 figures started on a relatively downward trend
(albeit more gradual towards the end of 2022 and into 2023), with the
latest figures as at December 2023 showing 3.3% of the working age
people now claiming one or more of the key benefits in NL, compared
to a national average of 3%. 
• The latest NL figure is now lower than The Plan for North Lanarkshire
baseline.
• The latest figure equates to 7,320 people claiming work related
benefits in NL as at December 2023 - a 7% decrease from the
December 2019 claimant count of 7,890 (pre-pandemic levels), but
only a decrease of 100 from 7,330 as at December 2022.
• The latest figure do however represent a 48% decrease from
December 2020 (14,195), and  a 23.6% decrease from December
2021 (9,580) - Figure 20b shows the trends in this respect.
• Notes: The trends in this indicator should be considered alongside
indicator C18 for the % of all people economically active.
6
Claimant count by age
• Figure 20c shows claimant count by age group, with
those aged 25-49 accounting over half of the claimants
in NL, and this proportion increasing from 57% to 60%
over the period of the time series. 
• Those age 16-17 account for the lowest proportion with
less than 1% across the timeseries.
• Those aged 50+ currently represent 20% of claimants
(an increase from 15% over the timeseries).
• Those aged 18-24 currently represent 19% of claimants
(a decrease from 27% over the timeseries).
This analysis continues on the next page / …
link to contents page
Page 89 of 326

Page 90

7
Claimant count by age
• Over the period of The Plan for North Lanarkshire:
Aged 25-49
- The number of people aged 25-49 claiming benefits had seen an increase from 4,205 in December 2018 to 4,460 in December 2019
followed by a steady incline to 8,790 in August 2020.
- After that, the trend shows a continual decline to a low of 4,180 in October 2023 before increasing slightly to 4,415 in December 2023 (as
shown in Figure 20e above).  This trend was in line with the national average
- However, there are currently 4% of the working age population in NL who are aged 25-49 and claiming benefits compared to The Plan for
North Lanarkshire baseline of 3.8% and a national average of 3.6% for this age group (as shown in Figure 20d).  This is also higher than the
overall NL claimant rate of 3.3%.
Aged 18-24
- The number of people aged 18-24 claiming benefits had seen an increase from 1,505 in December 2018 to 1,460 in December 2019
followed by a steady incline to 3,340 in August 2020.
- After that, the trend shows a continual decline to a low of 1,335 in October 2023 before increasing slightly to 1,355 in December 2023 (as
shown in Figure 20g above).  This trend was in line with the national average
- While there are 4.9% of the working age population in NL who are aged 18-24 and claiming benefits (less than The Plan for North
Lanarkshire baseline of 5.3%) this is still above national average of 4.2% for this age group (as shown in Figure 20f) and higher than the
overall NL claimant rate of 3.3%.
Aged 50+
- The number of people aged 50+ claiming benefits had seen a small decrease from 1,915 in December 2018 to 1,910 in December 2019
followed by a steady incline to 3,650 in August 2020.  After that, the trend shows a continual decline to 1,495 in December 2023 (as shown
in Figure 20i above).
- This is in line with a downward trend nationally and latest claimant count rates for this age group in NL (as shown in Figure 20h above)
equal the national average of 2% and are lower than the overall NL claimant rate of 3.3%.
Aged 16-17
- The number of people aged 16-17 had seen a slight increase from 50 in December 2018 to 60 in December 2019 followed by a steady
incline to a high of 105 in October 2020 (as shown in Figure 20k).
- After that, the trend shows a continual decline to a low of 50 in November 2023 before increasing slightly to 55 in December 2023.  This is
in line with the national trend and the latest rates in NL are less than 1% (as shown in Figure 20j) and equal to the national average.
/ continued from the previous page …
link to contents page
Page 90 of 326

Page 91

C19: Businesses - % of the VAT / PAYE registered businesses that survive for at least three years
Measuring this indicator will tell us if we have:  Increased and sustained new businesses in NL
What success looks like:  More locally generated and incoming businesses being created, surviving, and sustaining in the longer-term
The North Lanarkshire commentary:
• The latest business survival rates in NL show a varying position.  For business registered and surviving for at least three years
Figure19a shows that the latest result in this respect is 54%, a decrease from the previous year of 58%. 
• This downward trend does follow the national average, although at a slightly greater decrease.
• To review this in more context Figure 19b shows the shows the number of active NL businesses each year, as at 2022 this
shows there were 7,920 businesses, a decrease from a pre-pandemic high of 8,110 in 2019. However, this still remains an
increase in the number of active businesses each year over the period of The Plan for North Lanarkshire for 7,885 in 2018 to
7,920 in 2022. This shows that the early years of implementing The Plan for North Lanarkshire was impacted by the pandemic.
• Figure 19c shows the number of new NL businesses registered each year which are used in the survival assessment; over the
period of The Plan for North Lanarkshire this has increased from 1,090 to 1,170.  The dip in 2020 to 980 businesses would
suggest an impact of the pandemic.
• Latest results from the ONS Business Demography publication show that over the period of The Plan for North Lanarkshire the
number of abroad-owned registered private sector businesses in NL increased from 310 in 2018 to 385 in 2023 (not shown in
any graph here).  This inward  investment had a positive impact on Scottish employment, adding around 1,100 jobs.
8
• Figure 19d allows for a wider overview of business survival, i.e.
the rate of survival after 1, 2, 3, 4, and 5 years.  Again this
shows a varying picture, but the most significant point is the
reducing survival rate as the years progress, for example
93.6% of businesses registered in 2017 survived for 1 year,
69.1% for 2 years, 51.8% for 3 years, 42.3% for 4 years, and
34.5% for 5 years.
• Notes: This data comes from the Businesses Demography
2022 publication (published in November 2023) and produced
by the Office for National Statistics (ONS) using data from the
Inter-Departmental Business Register (IDBR). The main
administrative sources for the IDBR are VAT trader and PAYE
employer information passed to the ONS by HM Revenue and
Customs under the Value Added Tax Act 1994,  For VAT
traders and the Finance Act 1969 for PAYE employers, details
of incorporated businesses are also passed to ONS by
Companies House.
This analysis continues on the next page / …
link to contents page
Page 91 of 326

Page 92

/ continued from the previous page …
Registered private sector businesses by sector:
• Figure 19e shows the number of registered private sector
businesses from 2010 to 2023.  The highest volume of registered
businesses had been consistent in sector G (wholesale and retail
trade), until 2023 when this was overtaken by sector F
(construction). 
• As can be seen from the line on the graph, the construction sector
(F) has shown a year-on-year increase.
• Figure 19f shows the change in the number of registered
businesses from 2010 to 2023 with an increase of 440 for F (the
construction sector) over this period.
• Figure 19g shows the change in the number of registered
businesses from 2019 (pre pandemic figures) to 2023 - again this
shows an increase in F (the construction sector of 185
businesses). 
• Figure 19g also shows the significant drop in registered
businesses for sector M (professional, scientific and technical)
and sector J (information and communication).
• Figure 19h shows that two thirds of all private sector businesses
registered in NL comprise 4 employees or less; this rises to 76%
in sector F (construction).
• Notes: This data comes from the Businesses in Scotland 2023
publication produced by the Scottish Government which uses
source data from the Office for National Statistics (ONS) Inter-
Departmental Business Register (IDBR).  The latest figures relate
to a snapshot of the business stock as at March 2023.  Data does
not include central or local government.
• Notes: Sites are allocated a sizeband by their total number of
employees at that business site.
9
link to contents page
Page 92 of 326

Page 93

C27: Employment - total employment in sustainable tourism as % of growth sector
employment
The North Lanarkshire commentary:
• Sustainable tourism is one of 6 sectors used to assess growth in employment.  Figure 27a above
reflects employment in NL in each of the 6 growth sectors. 
• As shown in Figure 27b above, employment in sustainable tourism sector in NL as a proportion of
employment in all 6 sectors combined has remained at a relatively steady level over the years and the
trend has followed the national average.
• Figures for the growth rate in NL in 2021 showed the highest rate to date (28.6%) before dropping
slightly to 28.2% in 2022.  Latest figures still represent an increase from The Plan for North Lanarkshire
baseline (25.2% in 2017).
• Notes: Scotland's Economic Strategy (2015) identified those sectors where Scotland has a distinct
comparative advantage: food and drink (including agriculture and fisheries), creative industries
(including digital), sustainable tourism, energy (including renewables), financial and business services,
and life sciences.  Growth sector definitions are based on Standard Industrial Classification (SIC)
Codes 2007. 
The North Lanarkshire commentary:
• GVA (£) per head in sustainable tourism has fluctuated in NL over the period of the
reported data and from The Plan for North Lanarkshire baseline (as depicted in Figure 28a
above and also reflected in Figure 28b above which shows the % year to year change in
GVA per head).
• NLs trend has followed the national trend, albeit with a greater degree of fluctuation.
• The effects of the pandemic can be seen in the 2020 figures with a 33% decrease in
sustainable tourism employment in the national average compared to a 50% decrease in
North Lanarkshire. 
• In 2021, North Lanarkshire's recovery of +£6,468 per head amounts to an 89% increase on
the previous year, compared to a national average of +£2,649 (+20%).
C28: Gross Value Added - per head in sustainable tourism (employment)
Measuring these 2 indicators will tell us if we have:  Increased benefit from tourism in NL
What success looks like:  Continued economic growth in this sector
10
The Sustainable Tourism sector relates to: Hotels and similar accommodation, Holiday and other short-stay
accommodation, Camping grounds, recreational vehicle parks and trailer parks, Restaurants and mobile food service
activities, Beverage serving activities, Tour operator activities, Other reservation service and related activities,
Museum activities, Operation of historical sites and buildings and similar visitor attractions, Botanical and zoological
gardens and nature reserve activities, Operation of sports facilities, Other sports activities (not including activities of
racehorse owners), Activities of amusement parks and theme parks, and Other amusement and recreation activities.
link to contents page
Page 93 of 326

Page 94

C11: Educational attainment - % of pupils gaining 5+ awards at level 6
The North Lanarkshire commentary:
Level 6
• Educational attainment at this level in NL continues to improve in line with
national trends and remains higher than the family group of similar councils. 
The latest figures in Figure 11a (37% in 2021/22) show an improvement
from The Plan for North Lanarkshire baseline (32% in 2017/18).
Level 3
• While SCQF Level 6 provides a measure for those achieving at the highest
level in school, it does not provide a picture of those who have chosen other
pathways.  For example, latest results show that 96.2% of all pupils in NL
achieved 1 or more awards as SCQF level 3 or above compared to a
national average of 97.9%.  This means, as shown in Figure 11b, that 3.8%
of all pupils in NL achieved no passes at this level compared to a national
average of 2.1%.
Looked after children
• Improvements in educational outcomes for looked after children remain less
easy to be seen due to a significant time lag in the data. 
• Latest results in Figures 11c  and 11d show 67% of looked after children in
NL achieved receiving one or more awards at SCQF level 3 and 46%
achieved one or more awards at SCQF level 4.  Both figures are lower than
the previous results and the national average.
Measuring this indicator will tell us if we have:  Improved the outcomes for NLs young people
What success looks like:  Every child leaving a NL school achieves a basic qualification as a minimum, or qualifications that support their chosen pathway
C12: Educational attainment - % of pupils living in 20% most deprived areas (as defined by the Scottish Index of Multiple Deprivation) gaining 5+ awards at Level 6
Measuring this indicator will tell us if we have:  Improved the outcomes for the young people living in NLs most disadvantaged communities
What success looks like:  Having no gap in attainment levels across all of NL
The North Lanarkshire commentary:
• Educational attainment for pupils living in the 20% most deprived areas
continues to improve from The Plan for North Lanarkshire baseline as
shown in Figure 12a (18% in 2017/18 to 22% in 2021/22) and is higher
than the national average.
• There is however still a marked difference in attainment at this level for
those pupils living in the 20% most deprived areas, compared to the
overall student population (indicator C11). 
• Between the overall figure (C11), and that for those living in the most
deprived areas (C12), there remains a 15 percentage points difference
in attainment at SCQF level 6 or above in 2020/21 (compared to a 17
percentage point gap nationally).  The gap in NL has increased from 14
percentage points over the period of The Plan for North Lanarkshire (as
shown in Figure 12b).
• Notes: See notes for C11.
11
• Notes: Due to the pandemic the time period covered by this data reflects four distinct approaches to assessment and certification of SQA attainment.  This includes a longstanding use of exams and
externally assessed coursework (pre-pandemic), the use of estimates as a basis for awards in 2020, an Alternative Certification model in 2021, and the return of formal exams in 2022 with adjustments in
place to mitigate the ongoing effects of the pandemic.  The different circumstances and awarding processes of 2019, 2020, 2021, and 2022 do not therefore allow for a wholly accurate comparison across the
years and therefore this context needs to be taken into account when reviewing the data and trends for indicators C11 and C12.
link to contents page
Page 94 of 326

Page 95

12
C13: Post school destinations - % of pupils entering positive destinations
The North Lanarkshire commentary:
• The proportion of pupils leaving school in NL and entering a positive destination reached its highest level to date in 2020/21 with
94.5%; latest figures for 2021/22 have dropped slightly (in terms of the proportion) to 94.2% (as shown in Figure 13a).
• This still improves on The Plan for North Lanarkshire baseline of 91.8% (in 2016/17) as shown in Figure 13a.
• The latest result of 94.2% equates to 3,676 leavers achieving a positive destination out of 3,904 meaning 228 leavers did not
achieve a positive destination (as reflected in Figure 13b).  It should be noted that this change in the % result does not effectively
show the impact in terms of the number of leavers.  The results in the previous year (94.5%) represented a smaller number of
school leavers (i.e. 3,492 achieving a positive destination out of 3,696, which meant 204 leavers did not achieve a positive
destination). 
• From the additional 208 leavers in 2021/22, the number not achieving a positive destination only increased by 24 from 204 to 228.
• Performance in NL has mirrored the national average in recent years and the latest results show NL is now just over one
percentage point below the national average (95.5%).
• The proportion of those pupils not entering a positive destination has dropped by around 75 leavers (from 8.2% to 5.8%, i.e. 303
to 228 leavers) over the period of The Plan for North Lanarkshire.
Positive destinations
• Figure 13c shows the main destinations for leavers (higher education, further education, employment, and training) where the
data reflects a decline in numbers over the period of The Plan for North Lanarkshire for all except training.
• Notes: Figure 13c only reflects the 4 main positive destinations so figures will not add up to the totals in Figure 13b
Not achieving a positive destinations
• Of the 5.8% of leavers not achieving a positive destination in 2021/22 (i.e. 228), over half are unemployed and seeking
employment, while just under a third are unemployed not seeking employment.
• Figure 13d show those the main reasons for not entering a positive destination; this data shows a significant decrease over the
period of The Plan for North Lanarkshire in terms of those unemployed and seeking compared to a small increase in those
unemployed and not seeking.  A very small increase can be seen in unknown destinations over the period of The Plan for North
Lanarkshire.
Measuring this indicator will tell us if we have:  Improved the further education and employment prospects for NLs young people
What success looks like:  Every child leaving a NL school is able to share equally in the improving economic picture and achieve the pathway they wish to
link to contents page
Page 95 of 326

Page 96

C21: Qualifications - % of the working age population (aged 16-64 years) that have no formal qualifications
Measuring this indicator will tell us if we have:  Increased the qualification levels of NLs workforce
What success looks like:  An increase in formal qualifications are important for the working age population in order to increase skills and flexibility
within the workforce
The North Lanarkshire commentary:
• Figure 21a shows a general downward trend over the years to 12.8% in 2020 which shows ongoing improvement in terms of the % of
NLs working age population that have no formal qualifications.
• Latest results in 2021 show an increase to 18.6% that is not in line with the previous NL trend or the national trend.  The Office of
National Statistics were contacted regarding this figure and suggested that the confidence interval for the data lies between 12.7% and
24.5%, meaning the actual result can lie anywhere between these two figures.  It’s not completely clear why there is such a wide
confidence interval in NL as surrounding council areas have not seen the same degree of change, other than this data is obtained from a
single survey for which the sample size may have had an impact.
• Figure 21b shows that in 2020 there were 27,600 of NLs working age population with no formal qualifications.  This restricts their ability to
access current or developing employment opportunities. 
• The 2020 figures reflect a gradual improvement from The Plan for North Lanarkshire baseline (13.6% in 2017, which equated to 29,600
people); a decrease of 2,000 people over the period of The Plan for North Lanarkshire.
• Figure 21b shows that the latest results in 2021 (18.6%) represent 40,100 people. 
13
C14: School exclusion rate per 1,000 pupils - all children
Measuring this indicator will tell us if we have:  Reduced the number of children not in education
What success looks like:  No child in NL is excluded from education
The North Lanarkshire commentary:
• NL schools have seen a drop in exclusion rates over the period of the reported data which
is consistent with the rate of improvement nationally. 
• NL exclusion rates are closer to those of comparator councils (where rates are an average
13.7 per 1,000 children).
• A range of service interventions have improved supports for NLs pupils in recent years,
this has ensured that resources and decision making are devolved to where needs arise.
• Over the period of The Plan for North Lanarkshire overall exclusion rates have improved
by 56% from 35.1 per 1,000 pupils in 2016/17 to 15.3 in 2020/21).
• Notes:  This data is only published every two years, so there are no changes from the
position reported as at March 2023.
C15: School exclusion rate per 1,000 pupils - looked after children
Measuring this indicator will tell us if we have:  Reduced the number of NLs most vulnerable children and young
people not in education
What success looks like:  No child looked after in NL is excluded from education
The North Lanarkshire commentary:
• NL schools have also seen a significant drop in exclusion rates for looked after children over the
period of the reported data which is in line with the trend nationally. 
• The latest NL exclusion rates for looked after children (95.7 per 1,000 children) are now lower
than those of comparator councils (where rates are an average of 127.2 per 1,000).
• Over the period of The Plan for North Lanarkshire exclusion rates for looked after children have
improved by almost 70% from 317.9 per 1,000 pupils in 2016/17 to 95.7 in 2020/21).
• A range of service interventions have improved supports for NLs pupils in recent years, this has
ensured that resources and decision making are devolved to where needs arise.
• The calculation for this indicator have changed in previous years and all figures have been re-
baselined; this means it is now comparable with overall exclusion rates (i.e. indicator C14).
• Notes:  This data is only published every two years, so there are no changes from the position
reported as at March 2023
link to contents page
Page 96 of 326

Page 97

C22: Poverty - % of children in poverty after housing costs
The North Lanarkshire commentary:
• With the vision of inclusive growth and prosperity for all in The Plan for North Lanarkshire, this indicator is of
particular relevance to ensure that all of NLs children get the best start in life.
• Significant improvements are noted in the proportion of children in poverty over the initial period of The Plan
for North Lanarkshire - from a baseline of 25.2% in 2016/17 to 23.2% in 2020/21.
• Figures in 2021/22 have increased to 26.6%; the trend in NL in this respect follows both the national and
family group trends and the latest results are suspected to show the impact of the pandemic.
• This means there remains almost one in four children in NL living in poverty - higher than the national
average of just over one in five children.
Measuring this indicator will tell us if we have:  Reduced the number of NLs children and their families living in poverty
What success looks like:  No child in NL experiences disadvantages because of poverty
C10: Child wellbeing - % of children reviewed at 27 to
30 months with no concerns recorded
Measuring this indicator will tell us if we have:  Improved the wellbeing of NLs youngest children
What success looks like:  The majority of NLs babies get the best start in life and where issues
occur, they are addressed at the earliest opportunity
The North Lanarkshire commentary:
• 79.1% of children in NL have no concerns in any domain at their 27-30 month
review compared to a national average of 82.1%.  This is a decrease in the
proportion with no concerns from 82.9% in the previous year.
• This means there are 20.1% of children in NL who have concerns recorded in
at least one domain. 
• The pattern for children with no concerns in any domain (one or more domains)
remains less than the highest level recorded in 2017/18 (83.7%), and lower
than The Plan for North Lanarkshire baseline of 81% (2016/17).
• Along with the decrease in the proportion of no concerns recorded from
2020/21 to 2021/22 there is a corresponding increase in the proportion where
one or more concerns have been recorded.
• Figure 10b shows this has increased from 17% to 21% in NL; this trend follows
the national picture albeit to a slightly greater extent.
• Early identification of developmental issues is crucial to ensuring that children
reach their full potential.
• Notes: This indicator records the average number of concerns identified at the
case conferences / planning meetings of children who are on the child
protection register.  The pandemic led to changes in how reviews were
delivered as well as the circumstances of daily life for many children in 2020/21
and 2021/22.  It is possible that both factors relating to assessment and
recording, and genuine changes in the occurrence of developmental problems,
have contributed to the increase in the data in 2021/22.
14
• There are a broad range of factors
contributing to child poverty locally and of
concern is the disparity across wards in NL,
as according to HMRC data for March 2021,
there were 11,697 (18.8%) children aged 0 -
15 in NL living in relative low-income
families.
• Figure 22b with the latest figures for 2021
shows that this ranges from 23.4% in Airdrie
Central ward and 22.9% in Coatbridge
North, to 10.6% in Stepps, Chryston, and
Muirhead and Cumbernauld North.
• Notes: A family must have claimed child
benefit and at least one other household
benefit at any point in the year to be classed
as low income using the data in Figure 22b.
• Notes: The data in Figure 22a which looks at
poverty levels after housing costs is not
available at a level below North Lanarkshire,
therefore the data depicted in Figure 22b is
obtained from a different source and looks at
children living in relative low-income
households before housing costs.
link to contents page
Page 97 of 326

Page 98

C09: Breastfeeding - % of babies breastfed at 6-8 week review (overall rate)
Measuring this indicator will tell us if we have:  Improved the wellbeing of our youngest children
What success looks like:  The majority of NLs babies get the best start in life and where issues occur, they are
addressed at the earliest opportunity
The North Lanarkshire commentary:
• NL has experienced a small year on year improvement in the proportion of babies breastfed at the 6-8 week review, which had
been on a par with the level of improvement seen nationally.
• The latest figures show that 30.4% of babies in NL are breastfed at their 6-8 week review, getting the best start in life; this is a
significant  improvement from the previous year (26.6%) and The Plan for North Lanarkshire baseline of 23.1% in 2017/18.
• This shows a decrease of babies in NL who are not breastfed at their 6-8 week review from 76.6% to 69.6% over the period of
The Plan for North Lanarkshire.
• In 2021, the council, in partnership with NHS Lanarkshire, has taken a multi-strand approach to the promotion of breastfeeding
in the organisation and wider community. As the Breastfeeding Friendly initiative progresses, this indicator enables a baseline
against which to measure impact.
15
C23: Life expectancy at birth - estimates (males and females)
Measuring this indicator will tell us if we have:  Improved the life expectancy of NLs residents
What success looks like:  More of NLs residents remain healthy for longer
The North Lanarkshire commentary:
Life expectancy at birth - males:
• Latest life expectancy estimates in NL are 74.5 for males (depicted in Figure 23a).  Although this age had been rising
in recent years, gains had started to stall both locally and nationally but in NL the latest figures shown a slight
increase from the previous year of 74.1.  Life expectancy is still lower than The Plan for North Lanarkshire baseline of
75.3.
• Until the latest results, life expectancy for males in NL had been following the national trend but the latest results
show an improvement in NL from the previous year while the national average remains the same as the previous
year (76.5).
Life expectancy at birth - females:
• Latest life expectancy estimates in NL are 78.7 for females (depicted in Figure 23b).  Although this age had been
rising in recent years, gains have lately started to stall both locally and nationally and this is lower than 78.8 in the
previous year, and lower than The Plan for North Lanarkshire baseline of 79.4.
• Life expectancy for females in NL follows the national trend but remains below the national average (80.7).
• Notes: Life expectancy is the average number of years (at birth) that an individual is expected to live based on current
mortality rates.
Healthy life expectancy - males:
• When considering the latest healthy life expectancy data (depicted in Figure 23c), the average age of healthy life
expectancy at birth is 54.3 for males in NL. This is lower than the previous year (56.6) and lower than the latest
national average (60.4).
Healthy life expectancy - females:
• When considering the latest healthy life expectancy data (depicted in Figure 23c), the average age of healthy life
expectancy at birth is 56.7 for females in NL. This is higher than the previous year (55.5) but lower than the latest
national average (61.1).
• Notes, healthy life expectancy data adds a quality-of-life dimension to estimates of life expectancy.  Healthy life
expectancy is the average number of years that an individual is expected to live in a state of self-assessed good or
very good health, based on current mortality rates and prevalence of good or very good health.  Considering health
life expectancy data therefore brings in aspects around health and care and the importance of active and healthy
lifestyles. link to contents page
Page 98 of 326

Page 99

C24: Independent living - % of adults supported at
home who agreed that they are supported to live
as independently as possible
The North Lanarkshire commentary:
• C24: The results from the 2021/22 perception survey showed that 60% of people surveyed in NL agreed they were supported to live independently, with 40% who feel they are not.  The latest figures
for 2021/22 show a decline in satisfaction both in NL and nationally compared to the previous survey results in 2019/20.
• C25:  In 2021/22, 55% of people surveyed in NL agree that service and support improves their quality of life, 45% disagreed.  The latest figures for 2021/22 show a decline in satisfaction both in NL
and nationally compared to the previous survey results in 2019/20.
• C26: In 2021/22, the percentage of people in NL who agree they are supported to continue caring decreased to 33% from 25% in the previous survey in 2019/20.  The latest figures for 2021/22
show a decline in satisfaction both in NL and nationally.
• It is expected that the 2021/22 results will reflect to some extent individual perceptions that were acquired during the pandemic, making the survey results in 2019/20 and 2021/22 less able to be
compared on a similar basis.
• Notes: Data for these indicators comes from a national Health and Care Experience Survey; 130,352 (out of 537,924) individuals registered with a GP practice in Scotland responded to the 2021/22
survey, giving an overall response rate of 24%. 
- The survey asks about people's experiences (during the previous 12 months) of accessing and using their GP practice and other local healthcare services; receiving care, support and help with
everyday living; and caring responsibilities. 
- Response rates in 2021/22 in NL were 20% (7,327 out of a sample of 36,606).
- This survey is undertaken approximately every two years.  The 2023/24 survey is now closed, and the results are expected to be published in May 2024.
- Changes in the indicator calculations nationally in 2018 mean figures before this date are not necessarily directly comparable with 2019/20 and 2021/22 figures for all 3 indicators.
- This data is only published every two years, so there are no changes from the position reported as at March 2023.
Measuring these 2 indicators will tell us if we have:  Improved the independence and quality of life of NLs older residents
What success looks like:  NLs residents are supported as independently as possible for as long as possible
C25: Quality of life - % of adults supported at home who
agree their services and support had an impact on
improving or maintaining their quality of life
C26: Carers - total combined % of carers who feel
supported to continue in their caring role
Measuring this indicator will tell us if we have:  Improved
support to NLs residents who care for others
What success looks like:  NLs residents are supported as
independently as possible for as long as possible
16
link to contents page
Page 99 of 326

Page 100

C06: Crime - % change in total recorded crime
Measuring this indicator will tell us if we have:  Reduced NLs recorded crime rates
What success looks like:  NL experiencing a continued reduction in overall crime
The North Lanarkshire commentary:
• Results from 2019/20 onwards had started to show a decreasing change in total recorded crime in North Lanarkshire which was a
more positive picture than nationally (Figure 6a).
• The latest results for 2022/23 in Figure 6a show an increase of 0.6% in total recorded crime from the previous year compared to an
increase of 1% nationally.
• It is expected that the number of recorded crimes will have been impacted by the pandemic and this can be seen in Figure 6b, with a
decrease from 22,378 in 2019 to 21,734 in 2020/21 and 18,644 in 2021/22.  Figures for 2022/23 to date (18,751) are positive in that
they have not returned to pre-pandemic levels and remain lower than The Plan for North Lanarkshire baseline (20,425).
• Figure 6c provides a breakdown of the crimes recorded by category.
• Notes: Total recorded crime includes all crime recorded in the following categories - damage and reckless behaviour, crimes of
dishonesty, crimes against society, sexual crimes, non-sexual crimes of violence, and coronavirus restrictions.
C05: Household waste - % recycled
Measuring this indicator will tell us if we have:  Improved NLs waste recycling rates
What success looks like:  Residents of NL actively reducing the amount of their household waste going to
landfill and increasing their recycling rates
The North Lanarkshire commentary:
• The previous two years have seen an
increase in the proportion of
household waste that is recycled in
NL, with the latest figure showing this
to be 43%.
• This is on a par with the national
average (43.3%) and shows
improvement over the period of The
Plan for North Lanarkshire (from a
baseline rate of 41.1% in 2016/17).
• Nationally recycling rates have
plateaued in recent years - this
certainly reflects the impact of the
pandemic and with more people
staying at home there was increase in
residual waste, while recycling
tonnages remained similar. 
• In NL 2021 saw an increase in
tonnage recycled to 69,610 and while
this decreased slightly the following
year (to 63,055), this remains higher
than The Plan for North Lanarkshire
baseline.
• Notes:  The national recycling targets
are not statutory.
17
link to contents page
Page 100 of 326

Page 101

C07: Rating of neighbourhood (includes all neighbourhoods) - % good / very
good ratings
Measuring this indicator will tell us if we have:  Improved NLs residents’ perceptions of their neighbourhoods
What success looks like:  Having neighbourhoods where people want to live is a fundamental aspect of the
shared ambition
The North Lanarkshire commentary:
• Residents’ perceptions of their neighbourhood in NL in indicator C07 (see Figure 07a) have remained relatively stable with little change recorded over the years.  This mirrors the picture nationally.
• A slight decline (from 90% who rated their neighbourhood as very good or fairly good to 87%) can be noted in ratings over the recorded data for neighbourhood as a place to live in the 20% most
deprived areas (see Figure 08a) compared to all neighbourhoods.  Conversely the national picture reverses this trend with an increase from 82% to 86% over the same period.  However, the national
picture shows ratings at a lower level than NL over the time series.
• Both indicators show a decline immediately following the baseline of The Plan for North Lanarkshire, however both indicators almost show an increasing trend since and the latest results differ very little
to The Plan’s baseline.
• Notes:  This data is obtained from the Scottish Household Survey which is derived from a small sample of the population.  Due to the pandemic the 2020 survey methodology significantly differed, and
these results are therefore not included in this analysis.  Results at a local authority level are not yet available from the 2022 Scottish Household Survey. 
C08: Rating of neighbourhood as a place to live - % good / very good ratings (includes
only the 20% most deprived neighbourhoods, as defined by the Scottish Index of Multiple Deprivation)
Measuring this indicator will tell us if we have:  Improved the perceptions of NLs most disadvantaged communities
of the areas in which they live
What success looks like:  Improvements to the most deprived neighbourhoods to ensure that residents share
equally in the improving picture and there is social inclusion across our diverse towns and communities
18
link to contents page
Page 101 of 326

Page 102

C04: Housing - estimated housing by tenure
Measuring this indicator will tell us if we have:  Increased the housing choice available to NLs existing and future residents
What success looks like:  Having a range of housing stock that meets population growth demands and also changes in household composition
The North Lanarkshire commentary:
• The council remains the largest local authority landlord in Scotland
with a stock of 36,961 homes (2022).
• In terms of overall households, there were an estimated 153,643  in
NL in 2021 - which is an increase of 16% (20,888) from 2001
compared to an increase of 15% in the number of households in
Scotland over the same period.
• Figures 04a and 04b on the left show NLs housing by tenure, with
the largest proportion being owner occupied. 
• Note, the 2020 figures published have combined owner occupied
and private rented figures together - this explains the even larger
increase in the owner occupied figure in 2020.
• While the population is expected to fall overall by 0.9% by 2043,
household numbers are projected to rise by 9%; this will mean
increased demand for homes - the table below provides more
details in terms of household projections (from a 2018 base). 
• The number of individual households in North Lanarkshire are
predicted to increase by 5,720 new households by 2028 and by a
further 4,720 from 2028 to 2043.
• More significantly, single adult households are projected to increase
by 14% (almost 7,240 people) by 2,043. 
• Similarly households with 2 adults are projected to increase by
14.1% (+6,080) by 2043.
• Notes: No new data has been published at local authority level since
the previous update as at March 2023.
19
link to contents page
Page 102 of 326

Page 103

C03: Net migration - total rate per 1,000 population
Measuring this indicator will tell us if we have:  Increased NLs population and net inward migration
What success looks like:  Steadily increasing population in NL, and in particular growth in the number of school age children
and the working age population
The North Lanarkshire commentary:
• Inward migration in NL has been positive in recent years,
meaning more people have moved in than out. 
• The recent trend shows a 3.2% increase in net migration
(2021) which is contributing to NLs population growth. 
• While this trend mirrors that of the national position
5.1%), inward migration in NL remains at a lower growth
rate than Scotland. 
• Inward migration is a general sign of a positive economic
picture.
• Notes: No new data has been published since the
previous update as at March 2023.
C01: Population projections - % change
The North Lanarkshire commentary:
• The NL population is projected to increase 0.3% from 2018 to 2028 (+990 people), compared to growth of 1.8% in
Scotland. The NL population is then projected to fall by a further -0.9% (-3,010 people) from 2028 to 2043. 
• The tables above show a detailed breakdown of the projected change in the population from 2018 to 2028 when
growth remains favourable, and from 2018 to 2043 when growth is predicted to decline.
• Of note are changes that by 2043 will see a 7.6% reduction in the working age population and a 14.8% reduction in
children aged under 16, but a 39.6% increase in adults aged 65+.
• Within the aged 65+ age range, population projections expect to see a 16.2% increase in adults aged 65 to 74 and
a 71.5% increase in adults aged 75+.
• Notes:  No new population projections have been published at a local authority since the last update as at March
2023.  These are expected in the spring of 2024 and will be re-baselined in line with the new census data.
C02: Population - mid-year estimates (mye)
The North Lanarkshire commentary:
• NLs population has been growing since 2009.  The population as at The Plan for North
Lanarkshire baseline was 339,960; this increased to 341,400 in 2021.
• This growth rate was lower than the national average and there was a drop in growth as at
2020, but this was followed by a small increase in the 2021 update.
• Population projections estimate that NLs population growth will remain favourable to 2028,
even before housing growth expected from the new housing supply programme is factored
in, but drop by 0.9% by 2043.
• Notes:  No new population mid year estimates have been published since the last update
as at March 2023.  These are expected in the spring of 2024 and will be re-baselined in
line with the new census data.
Measuring these 2 indicators will tell us if we have:  Increased NLs population and net inward migration
What success looks like:  Steadily increasing population in NL, and in particular growth in the number of school age children and the working age population
20
link to contents page
Page 103 of 326

Page 104

Page 104 of 326

Page 105

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref DM/SL Date 14/03/24 
The Plan for North Lanarkshire - Delivering the Programme of
Work to 2028 
From  Des Murray, Chief Executive  
E-mail murraydes@northlan.gov.uk Telephone 01698 302350 
Executive Summary
As the Policy and Strategy Committee are aware, the Programme of Work is key to
achieving the shared ambition set out in The Plan for North Lanarkshire. To date it has
collectively facilitated a co-ordinated approach to successfully delivering a wide range of
programmes, projects, and large-scale transformational activities, including the council’s
capital investment programme.   
The accompanying report on the agenda today sets out the extent of the significant
achievements that have been realised through the Programme of Work to date in terms of
maximising the potential of North Lanarkshire as a place and realising inclusive growth and
prosperity for all.  These achievements reflect what is now a well-established portfolio of
programmes, projects, plans, and activities that have a dedicated focus on improvement,
change, and delivering services that improve the lives of local people and that are well
underway and delivering (at scale and pace) on the vision set out in The Plan for North
Lanarkshire. 
Following Policy and Strategy Committee approval of the new five-year Programme of
Work to 2028, a report in September 2023 fulfilled the commitment to provide an update
on the next steps, and high-level deliverables, to set the direction to further develop the
seven priorities in the new Programme of Work into actions to be delivered on the ground.   
As per the commitment in the September 2023 report to set out a detailed delivery plan for
the Policy and Strategy Committee in cycle 1 of 2024, this report contains the Single
Integrated One Council Delivery Plan for the Programme of Work to 2028 which will be
formally in place for 2024/25 onwards. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Recognise the commitment now fulfilled to establish a single integrated council wide
delivery plan to support implementation of the Programme of Work to 2028, 
(2) Are aware of the indicative reporting schedule set out in Appendix 3 to ensure
ongoing Elected Member consideration and approval of the next phase of delivery
for the wide range of programmes, projects, and activities in the Programme of Work
to 2028, and
(3) Support the next steps (set out in paragraphs 2.5 and 2.6) to ensure the Policy and
Item 7
Page 105 of 326

Page 106

1. Background 
1.1 Policy and Strategy Committee will recall approving the new five-year Programme of
Work to 2028 in March 2023.  This was followed by a report in September 2023
(Delivering the Programme of Work to 2028) which provided Elected Members with
initial oversight of the Single Integrated high-level Delivery Plan for the Programme of
Work.   
1.2 The September 2023 report contained a refined list of high-level Deliverables which
reflected work undertaken to (a) review existing programmes, projects, or activities
within the scope of the new Programme of Work, (b) identify programmes of scale or
related interdependencies which required to be incorporated, and (c) identify potential
new areas where there were opportunities to add value and/or better co-ordinate
existing programmes, projects, or activities to meet the objectives of the new
Programme of Work and ensure a greater focus on scale and purpose. 
1.3 By providing indicative delivery dates and indicative funding intentions, the Single
Integrated high-level Delivery Plan in September 2023 provided an initial overview of
the roadmap to progress the shared ambition set out in The Plan for North Lanarkshire
and deliver on the vision of inclusive growth and prosperity for all with an equal
distribution of wealth across communities.   
1.4 In terms of the next steps, the report in September 2023 advised that a more detailed
delivery plan was in development and being progressed in conjunction with concurrent
financial planning priorities (in terms of future capital, revenue, and savings proposals
and prioritisation, and the alignment required thereafter in terms of budgets) in order to
ensure a more detailed Delivery Plan was available for presentation to the Policy and
Strategy Committee in cycle 1 of 2024.  The intent being that the detailed delivery plan
would thereafter formally be in place from 2024/25 onwards.   
1.5 This report fulfils that commitment and sets out a Single Integrated One Council
Delivery Plan for the Programme of Work to 2028 in Appendix 3.   
2. Programme of Work to 2028 
Single Integrated Council Wide Delivery Plan  
2.1 Members will recall the Programme of Work to 2028, approved at the Policy and 
Strategy Committee in March 2023, comprised seven priorities for delivery in respect 
of Transforming Places, Invest in North Lanarkshire, Sustainable Futures, Resilient
People, Brighter Futures, Digital North Lanarkshire, and One Service.  Appendix 1
Strategy Committee continue to play a key role in the delivery of The Plan for North
Lanarkshire by ensuring strategic oversight and monitoring of its ongoing
development, co-ordination, and delivery. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work All Programmes of Work 
Statutory / corporate / service requirement
Page 106 of 326

Page 107

provides a summary recap in terms of what each of these priorities aims to achieve. 
2.2 Appendix 2 sets out a strategic timeline overview.  This shows the significant extent of
the place-based investment to date that has been instrumental in establishing the
foundations that are creating the economic, social, and community conditions which
are enabling local people and communities (and the place that is North Lanarkshire) to
thrive.  The milestones in Appendix 2 highlight the key place-based deliverables in the
Single Integrated One Council Delivery Plan for the Programme of Work to 2028. 
2.3 Appendix 3 sets out the Single Integrated One Council Delivery Plan for the Programme
of Work to 2028.  As the vehicle for delivering The Plan for North Lanarkshire, the
Programme of Work has been instrumental in stabilising the strategic direction of the
council in the face of a fast paced, rapidly changing, and relentlessly uncertain local
government environment.  In doing so it has allowed for appropriate flexibility in the
operational delivery of many complex inter-connected programmes, projects, and plans
that are critical to ensuring a dedicated focus on improvement, change, and delivering
services that improve the lives of local people.  As such, it should be noted that the
information in the Delivery Plan in Appendix 3 reflects the moment in time when it was
created (i.e. as at early February 2024).  This means that the details reflect the known
position - regarding funding, deliverability, feasibility, and resourcing - as at the time it
was created which will be subject to change as each area of work is progressed,
developed, and delivered.   
2.4 Since the approval of the high-level deliverables at Policy and Strategy Committee in
September 2023, a Senior Responsible Officer (SRO) (i.e. a Chief Officer and member
of the council’s Corporate Management Team) has led on the development of a Delivery
Plan for each of the seven Programme of Work priorities. In doing so, the SROs have
maintained an overarching focus on ensuring each of the seven Programme of Work
priorities are developed and delivered in a way that ensures ongoing alignment to The
Plan for North Lanarkshire. The SROs are also responsible for making the
interconnections and managing the interdependencies across the seven Programme
of Work priorities, capitalising on existing synergies, identifying potential economies of
scale, and ensuring appropriate cohesion and integration in the use of resources. 
2.5  SROs have also ensured that development of the Delivery Plan for each of the seven 
Programme of Work priorities has been appropriately informed by live developments, 
in so much as is known at present, for example in terms of the National Care Service 
(Scotland) Bill, educational reform, and public sector reform. 
Programme of Work governance 
2.6 To deliver successful investment and transformational programmes and projects the
council needs to ensure plans are well-designed and well-executed. Good project
management arrangements and good governance therefore go hand in hand as
essential components to ensure investment is well-directed, delivered to time, cost, and
quality targets, and provides the expected benefits and improved outcomes locally.  As
such, the Programme of Work is supported by a governance framework that reflects
the requirements of Best Value and the principles of good governance, and is aligned
to the council’s other strategic and corporate monitoring and reporting arrangements. 
This includes the following: 
• Strategic Boards (chaired by a Senior Responsible Officer (SRO) who is a Chief
Officer), with a clear purpose and terms of reference with well-defined distinctions
and reporting lines and responsibilities in order to avoid any unnecessary
bureaucracy.
Page 107 of 326

Page 108

• A framework to facilitate a high-level assessment of risk within each of the seven
Programme of Work priorities.  In this respect, a Strategic Position Risk
Assessment (PRA) approach has been implemented which will require to be
reviewed and updated on a six-monthly basis.
• A single source of truth through a master Delivery Plan that is monitored quarterly
at each Programme of Work Strategic Board meeting.
• Quarterly monitoring arrangements comprising seven dimensions (scope, quality,
time, cost, resources, risk, and completed status) which are assessed through a
Red/Amber/Green (RAG) status.  This also supports exceptions reporting based
on a set of predefined parameters to enable areas requiring improvement to be
identified and corrective actions to be highlighted where required.  This aims to
ensure that information reported enables decisions and action at the most
appropriate level and management focus remains on the right issues
systematically.
• Quality assurance arrangements that assess compliance with the Project
Management Framework.
• Work by the Audit and Scrutiny Panel to provide independent strategic oversight
and assurance in terms of the delivery of major programmes and projects and
compliance with the Project Management Framework.
• Corporate Management Team oversight and monitoring of (a) the Programme of
Work, and its supporting programmes, projects, strategies, policies, and plans (and
strategic inter-connections therein) in so far as they relate to delivery of The Plan
for North Lanarkshire, and (b) the performance of the council and individual service
groupings to ensure effective use of resources, continuous improvement, and
ongoing delivery of The Plan for North Lanarkshire.
• Development of a suite of performance indicators, aligned to the Strategic
Performance Framework, to demonstrate progress in delivering the Programme of
Work and achieving the vision set out in The Plan for North Lanarkshire. 
Next steps 
2.7 Delivery of the Programme of Work to 2028 will continue to be monitored throughout
its lifespan through the supporting Single Integrated One Council Delivery Plan and the
established governance arrangements set out above.  The role of the Policy and
Strategy Committee is key to ensuring the continuing commitment to delivering The
Plan for North Lanarkshire through the Programme of Work and ensuring strategic
oversight in terms of its ongoing development, co-ordination, and monitoring.  As such,
the next steps include the following. 
• The annual review process will continue to support the Programme of Work to
2028.  This will ensure the council continues to (a) be able to adapt the Delivery
Plan to changing circumstances, (b) absorb the impact of major unpredictable
situations in order to keep plans relevant and the timescales therein realistic, and
(c) assess incremental changes and impacts arising from updates to the results for
the 28 Health Check Indicators.  
• The three related reports (i.e. that look back at the achievements to date, that
review the current North Lanarkshire context, and that look forward at future plans)
will continue to be developed and presented to the Policy and Strategy Committee
in cycle 1 each year. 
• Six monthly reporting arrangements will enable the Policy and Strategy Committee
to maintain their strategic oversight role of the overall Programme of Work to 2028
in relation to “development, co-ordination, and monitoring of The Plan for North
Lanarkshire” and to keep under review such “programmes as the Committee
considers necessary to achieve the council’s long-term aims and objectives”.   
Page 108 of 326

Page 109

2.8 To encourage largescale engagement, work is underway to develop a series of
roadshows with Elected Members, employees, communities, and partners in the spring
of 2024.  The roadshows will set out the journey of The Plan for North Lanarkshire to
date, as well as key successes achieved, and the next steps required to truly turn The
Plan’s place-based ambition into a reality.  Such an extensive programme of
engagement will aim to maintain the clear direction and long-term vision that The Plan
for North Lanarkshire provides and ensure that everyone involved in delivering the
Programme of Work to 2028 are clear about how they contribute and what its benefits
should be. 
3. Measures of success 
3.1  Measures of success will be evidenced through progress being made to deliver the
Programme of Work and ensure the council’s portfolio of programmes, projects, plans,
and activities impact positively on the North Lanarkshire context (evidenced through
the 28 Health Check Indicators) and thereby achieve the long-term vision of inclusive
growth and prosperity for all (as set out in The Plan for North Lanarkshire). 
4. Supporting documentation 
4.1 Appendix 1: Summary of what the seven Programme of Work priorities aim to 
achieve (as approved at Policy and Strategy Committee in March 2023). 
Appendix 2: Strategic timeline overview of the key milestones in delivering The 
Plan for North Lanarkshire. 
Appendix 3: Single Integrated Council Wide Delivery Plan for the Programme of   
Work to 2028. 
Des Murray
Chief Executive 
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
While there is no impact arising from the recommendations in this report, future
reports produced by Chief Officers in relation to the delivery of the Programme of
Work will be required to reflect any impacts in this respect. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☐ No ☐
Page 109 of 326

Page 110

If Yes, please provide a brief summary of the impact?
While there is no impact arising from the recommendations in this report, future
reports produced by Chief Officers in relation to the delivery of the Programme of
Work will be required to reflect any impacts in this respect.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
While there is no impact arising from the recommendations in this report, future
reports produced by Chief Officers in relation to the delivery of the Programme of
Work will be required to reflect any impacts in this respect.
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
While there is no impact arising from the recommendations in this report, future
reports produced by Chief Officers in relation to the delivery of the Programme of
Work will be required to reflect any impacts in this respect.
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
While there is no impact arising from the recommendations in this report, future
reports produced by Chief Officers in relation to the delivery of the Programme of
Work will be required to reflect any impacts in this respect. 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
While there is no impact arising from the recommendations in this report, future
reports produced by Chief Officers in relation to the delivery of the Programme of
Work will be required to reflect any impacts in this respect. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
Page 110 of 326

Page 111

environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
While there is no impact arising from the recommendations in this report, future
reports produced by Chief Officers in relation to the delivery of the Programme of
Work will be required to reflect any impacts in this respect.
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
While there is no impact arising from the recommendations in this report, future
reports produced by Chief Officers in relation to the delivery of the Programme of
Work will be required to reflect any impacts in this respect.
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Work to establish a Single Integrated One Council Delivery Plan (and supporting
governance arrangements) for the Programme of Work contributes towards
mitigating the risks on the Corporate Risk Register for (a) managing strategic
change and (b) governance, leadership, and decision making.
While there are no further impacts arising from the recommendations in this report,
future reports produced by Chief Officers in relation to the delivery of the
Programme of Work will be required to reflect any impacts in this respect.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
While there is no impact arising from the recommendations in this report, future
reports produced by Chief Officers in relation to the delivery of the Programme of
Work will be required to reflect any impacts in this respect.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC).
While there is no impact arising from the recommendations in this report, future
reports produced by Chief Officers in relation to the delivery of the Programme of
Work will be required to reflect any impacts in this respect. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 111 of 326

Page 112

Appendix 1 
Programme of Work priorities to 2028 
Page 112 of 326

Page 113

2018 - 2019
STRATEGIC TIMELINE OVERVIEW OF KEY MILESTONES IN THE PLAN FOR NORTH LANARKSHIRE
LOOKING BACK LOOKING FORWARD
£1.3bn of capital investment in improving the physical environment of
North Lanarkshire’s communities and supporting economic regeneration £tbc 5-year capital investment programme approved for 2024/25 to 2028/29
2020 - 2021 2022 - 2023 2024 - 2025 2026 - 2027 2028 - 2029 2030 - 2031
ACTIVE TRAVEL
STRATEGY
To accelerate networks
across the region
2021
EIGHT TOWN CENTRE
VISIONS APPROVED
2021
63 NEW
ESTABLISHMENTS
(11 secondary, 36 primary and
16 family learning centres (incl
1140 hours related centres)
BUILT SINCE 1996
20 TOWN CENTRE PROPERTIES / SITESPURCHASED AND IN DEVELOPMENT 2024
8 ADDITIONAL SUPPORT NEEDS PROJECTS IN PROGRESS 2024
FIRST INTERACTIVE
POD IN A PUBLIC
LIBRARY FEB 24
5 KEY BUSINESS AND INDUSTRY PROJECTS
inc Braidhurst Industrial Estate
2024-2028
COMMENCE PHASE 2 TOWER PROGRAMME DEMOLITIONS
2025-2026 
NEW LOCAL TRANSPORT STRATEGY
MAY 25
ORBISTON COMMUNITY HUB
MAR 26
GARTCOSH COMMUNITY HUB
MAR 26
CHRYSTON HIGH EXTENSION & 3RD SECTOR EARLY YEARS
Northern Corridor
MAR 27
CUMBERNAULD TOWN CENTRE PHASE 1 DEMOLITION
Estimated Start date
2027-2028
+ 5 KM OF ACTIVE TRAVEL NETWORKS
2028
BEGIN + 1,354 NEW SUPPLY HOMES
2028-2035
EAST AIRDRIE LINK ROAD
SEP 30
RAVENSCRAIG ACCESS INFRASTRUCTURE
APR 31
NEW
INDUSTRIAL ESTATE
Orbiston Street, Motherwell 
2021
10-YEAR
MASTERPLANS
Approved for Country Parks
for the Future
2019
58 DEVELOPMENTS
Town centre /edge of town
buildings and vacant sites
repurposed and redeveloped
2018 -2023
GLENBOIG LINK ROAD
2018
FIRST 5G  IMMERSIVE
CLASSROOM IN SCOTLAND
2021
£74M CAPITAL HOUSING INVESTMENT PROGRAMME2024-2025
EUROCENTRAL ACTIVE TRAVEL LINKS
MAR 27
ST STEPHEN’S COMMUNITY HUB
MAR 27
NEW LOCAL DEVELOPMENT PLAN
2028
CUMBERNAULD TOWN CENTRE PHASE 2 DEMOLITION
Estimated 2031-2033
COMPLETE DEMOLITION OF ALL TOWERSIN PHASE 2
Estimated 2031-2033
ST KEVIN’S COMMUNITY HUB
MAR 26
NEW ORCHARDFARM ROUNDABOUT
JAN 26
TOWN ACTION PLANS
Kilsyth, Coatbridge,
Bellshill, Shotts 2024
+ 15.4KM OF ACTIVE TRAVEL NETWORKS
JUN 24
COMPLETE PHASE 1 TOWER PROGRAMME
2025-2026 
+ 21.8KM OF ACTIVE TRAVEL NETWORKS
MARCH 25
NEW OPEN SPACE STRATEGY
2025
NEW LOCAL
DEVELOPMENT PLAN
JUL 22
THE PLAN FOR NORTH LANARKSHIRE ESTABLISHED
RE-PURPOSED 200 PROPERTIES SUPPORTING UKRAINE RESETTLEMENT 2023
11 LOW CARBON AFFORDABLE HOMES BUILT2023
MOTHERWELL STATION INTERCHANGE WORKS2023
7.7KMS OF VACANTLAND IMPROVED FOR INDUSTRIAL USE 2023
1,231 PROPERTIES
DEMOLISHED
of 1,750 Phase 1
Tower programme 2023
TOWN ACTION PLANS
Airdrie, Motherwell, Wishaw
2023
NEWMAINS +
ST BRIGID’S HUB
FEB 23
CUMBERNAULD TOWN
CENTRE PURCHASE
JUN 23
RIVERBANK
COMMUNITY HUB
AUG 23
PHASE 2 TOWERPROGRAMME APPROVEDAUG 23
1,000TH
NEW BUILD COUNCIL HOME AUG 23 
BEGIN + 2,000 NEW SUPPLY HOMES2023
CHRYSTON COMMUNITY HUB OCT 23
340KMS ULTRAFAST FULL FIBRE NETWORK 2023
Page 113 of 326

Page 114

Single Integrated one council Delivery Plan 
for the Programme of Work to 2028
Appendix 3
Page 114 of 326

Page 115

Programme of Work: Transforming Places
Senior Responsible Officer (SRO): Pamela Humphries (Depute SRO: James McKinstry) 
Deliverable: 
Complete 6 new build Town and Community Hubs, a £35m extension to Chryston High, and up to 18 schools / buildings
extended or upgraded to Hubs by 2028 (and progress design development of a further 3 for delivery post 2028) to support the
council’s asset rationalisation and maximise the efficiency of the asset portfolio in transitioning to a new operating model that will
lead to more positive outcomes for children, communities, and the economy across North Lanarkshire.
Town and community hubs
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Complete St Kevin's Community Hub in Coatbridge           Education, Children,
and Families
Committee
Cycle 4 of
2023
Cycle 2 of
2024 Stage 2 detailed design pricing and planning  -  target submission to NLC           
Financial close / DBDA contract agreement          
Construction notional start          
Hub operational 2025/26          
Complete Orbiston Community Hub in Bellshill          
Stage 2 detailed design pricing and planning - target submission to NLC          
Financial close / DBDA contract agreement          
Construction notional start          
Hub operational 2025/26          
Complete St Stephens Community Hub in Coatbridge          
Stage 1 pre-planning and affordability - target submission date to NLC          
Stage 2 detailed design pricing and planning - target submission to NLC          
Financial close / DBDA contract agreement          
Construction notional start          
Hub operational 2026/27          
Complete Chryston High extension and 3rd sector early years creation in the
Northern Corridor          
Stage 1 pre-planning and affordability - target submission date to NLC          
Stage 2 detailed design pricing and planning - target submission to NLC          
Financial close / DBDA contract agreement          
Construction notional start          
Extension completed 2026/27          
Complete Gartcosh Community Hub in the Northern Corridor          
Stage 1 pre-planning and affordability - target submission date to NLC          
Page 115 of 326

Page 116

Stage 2 detailed design pricing and planning - target submission to NLC          
Financial close / DBDA contract agreement          
Construction notional start          
Hub operational 2025/26          
Deliverable: 
Deliver 2,000 new council homes between 2023 and 2028 and a further 1,354 by 2035 to help meet housing need and support
town centre and community regeneration. 
Note, the wording on this deliverable was amended to reflect updated targets in this respect.  The deliverable previously read:
“Deliver 1,680 new council homes between 2023 and 2028 and a further 1,826 by 2035 to help meet housing need and support
town centre and community regeneration”.
New supply programme
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Deliver 1,200 new build homes, including 250 in town centres and 380 as part of
the re-provisioning programme.          
Housing Committee Cycle 4 of
2023
Cycle 4 of
2024
Deliver off the shelf acquisitions of 300 new build properties.           
Deliver open market purchases of 500 properties.          
Deliverable:  Review and update the New Supply Programme delivery plan to identify potential opportunities to accelerate / enhance the
programme and explore alternative tenure options to support economic and population growth.  New supply programme
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Complete review to identify potential opportunities to accelerate / enhance
programme and explore alternative tenure options to support economic and
population growth. 
Housing Committee Cycle 4 of
2023
Cycle 4 of
2024
Deliverable:  Develop a new Local Development Plan to support and facilitate future development in the right locations to help attract
investment in new homes and businesses and support sustainable communities and employment.  Local Development Plan
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Complete evidence report and obtain formal approval from Scottish Ministers.           Planning Committee Cycle 4 of
2023
Cycle 4 of
2024 Produce and publish Draft Plan for consultation.          
Consult on Draft Plan.          
Examination of Proposed Plan by Scottish Ministers.          
Adoption of Plan by the council and publication.          
Monitoring and delivery.          
Deliverable:  Complete an Open Space Audit and develop an Open Space Strategy, including sports pitch strategy, to help ensure local
communities have access to good quality, well maintained open space to meet their needs.  Open Space Strategy Page 116 of 326

Page 117

Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Complete open space audit.           Policy and Strategy
Committee
Cycle 1 of
2023
Cycle 2 of
2024 Draft Open Space Strategy.           
Carry out partner and community engagement on draft Open Space Strategy (12
weeks).          
Finalise the Open Space Strategy for approval at committee in cycle 4 of 2024.          
Deliverable:  Develop a Local Transport Strategy to help prioritise available investment to ensure communities can access employment,
education and leisure opportunities, support inclusive economic growth and contribute to reducing carbon emissions.  Local Transport Strategy
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Undertake strategy development and approval.           Environment and
Climate Change
Committee
No previous
report
Cycle 2 of
2025 Carry out public and stakeholder consultation, phase 1.          
Draft the strategy document.          
Carry out public and stakeholder consultation, phase 2.          
Finalise strategy for approval at committee in cycle 2 of 2025.          
Deliverable: 
Create 50 kms of active travel routes by 2028 to help establish a network of safe, accessible walking / wheeling / cycling routes
to help people access employment, education, and leisure opportunities, improve health and well-being, and reduce carbon
emissions. 
Active travel
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Deliver design and construction project in respect of Motherwell Station active
travel - over a number of phases (subject to approvals and external funding) -
approx 5 kms of active travel route (delivered by the City Deal team).          
Enterprise and Fair
Work Committee
Cycle 3 of
2023
Cycle 3 of
2024
Delivery construction project in respect of Carnbroe Community Hub active travel
improvements (approx 1.7 kms).          
Deliver construction project in respect of Meadowhead Road in Wishaw active
travel and road safety improvements (approx 0.7 kms).          
Deliver construction project in respect of Glasgow Road in Craigneuk active travel
improvements (approx. 1.9 kms).          
Deliver design project in respect of Airbles Road active travel improvements -
feasibility and concept design.          
Deliver design project in respect of Orbiston Community Hub active travel
Improvements (approx 1.3 kms).          
Page 117 of 326

Page 118

Deliver design project in respect of North and South Lanarkshire cross boundary
active travel improvements (approx 4.8 kms).          
Deliver design project in respect of Strategic Network route 7 (approx 15 kms).          
Deliver design project in respect of Strategic Network route 9 ( approx 6.8 kms).          
Deliver design project in respect of Croy Station active travel improvements phase
1 ( approx 0.5 kms).          
Incorporate active travel as a key priority when planning investment in the council's
current and future estate, including hub programme, to strengthen and improve
connectivity and uptake of walking and cycling. 
Establish bespoke active travel hubs at identified community hubs or other service
delivery areas.          
Deliverable:  Deliver the City Deal programme to improve connectivity and help support inclusive economic growth. City Deal
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Ravenscraig Access Infrastructure (RAI) April 2023 to April 2031           Enterprise and Fair
Work Committee
Cycle 4 of
2023
Cycle 1 of
2024 RAI Full Business Case 2 Motherwell to Ravenscraig submission to Glasgow City
Region Cabinet.           
RAI Motherwell to Ravenscraig works (phased delivery).           
RAI Full Business Case 4 Dualling of Airbles Road submission to Glasgow City
Region Cabinet.           
RAI Dualling of Airbles Road works. ( February 2028 to March 2029)          
RAI Full Business Case 3 Dualing of A723 submission to Glasgow City Region
Cabinet. (December 2028 to February 2029)          
RAI North - Dualling of A723 works. (April 2029 to April 2031)          
East Airdrie Link Road (EALR) September 2028 to September 2030             
Submission and approval of EALR Outline Business Case to Glasgow City Region
Cabinet.          
Stage 3 preliminary design and planning application - services contract.           
Submission and approval of EALR Full Business Case to Glasgow City Region
Cabinet.          
Detailed design and construction phasing.           
EALR works - link road delivery.  (September 2027 to September 2030)          
Orchardfarm Roundabout September 2024 to January 2026.             
Submission and approval of Full Business Case to Glasgow City Region Cabinet.          
Orchardfarm Roundabout - works delivered by third party  - NLC overview role.           
Eurocentral strategic Active Travel links April 2025 to March 2027           Page 118 of 326

Page 119

Eurocentral strategic active travel links Full Business Case  (phase 1 and 2).              
Eurocentral strategic active travel links Phase 1 and 2 works.           
Eurocentral strategic Active Travel links Full Business Case 2 (phase 3)
submission to the Glasgow City Region Cabinet.           
Eurocentral strategic active travel links Phase 3 works.           
Deliverable: 
Develop Business and Industry Strategy including review of available sites, and progress a minimum of 5 projects to remediate,
develop, or improve sites to help create new employment opportunities.
Note, the wording on this deliverable was amended to take into account likely available resources / reductions in the Vacant and
Derelict Loan Fund.  The deliverables previously read: “Develop a Business and Industry Strategy by 2024/25 including review
of available sites, and progress 7 projects to remediate, develop or improve sites to help create new employment opportunities.”
Business and industry
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Undertake strategic review of industrial space and sites allocated for business and
industry within the Local Development Plan.          
Enterprise and Fair
Work Committee
No previous
report
See Note 6.
Develop and launch Business and Industry Strategy and action plan.           No previous
report
Cycle 1 of
2025
Deliver (in conjunction with Fusion Assets and subject to available funding)
minimum of 5 key projects (including Braidhurst Industrial Estate) to develop /
improve business and industrial sites and create employment opportunities.          
Cycle 3 of
2023
Cycle 3 of
2024
Deliverable: 
Develop Town Action Plans for each town centre in line with the agreed Town Visions (completing 3 town action plans in 2023/24
and 4 in 2024/25) and progress delivery to help create sustainable mixed-use centres that will attract investment in new
employment and housing opportunities.
Town centres
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Finalise Town Action Plans for Bellshill, Kilsyth, and Shotts.           Enterprise and Fair
Work Committee
Cycle 4 of
2023
Cycle 2 of
2024 Complete annual review of Town Action Plans.          
Establish a Town Board and develop the long-term plan for Coatbridge, aligned to
the Town Vision, to secure and draw down the first tranche of the £20 million
allocated to Coatbridge over the next 10 years from the UK Government's Town
Fund. 
Deliverable:  Develop Delivery Plan for Cumbernauld Town Centre regeneration in 2023/24 and progress redevelopment plans and demolition
of the Centre Cumbernauld (with demolition commencing in 2027/28). Town centres
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Procure new management contracts.          
Page 119 of 326

Page 120

Progress development of proposals for the phased redevelopment of the town
centre, including traffic / transportation assessments.          
Enterprise and Fair
Work Committee
Cycle 3 of
2023
Cycle 4 of
2024
Undertake public consultation on draft proposals.          
Undertake phase 1 demolition (the most recently developed part of the shopping
centre at Teviot Walk / Teviot Square. (2027/28 to 2029/30)          
Undertake phase 2 demolition of The Centre Cumbernauld  (the older part of the
town centre on both the north and south side of Central Way, around Tweed Walk
and Tay Walk). (2031/32 to 2032/33)          
Deliverable:  Complete phase 1 Tower re-provisioning programme of 1,750 flats by 2025/26, and progress phase 2 comprising 964 flats. Towers strategy
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Undertake demolition at Coursington, Allan, and Draffen.           Housing Committee Cycle 4 of
2023
Cycle 2 of
2024 Undertake demolition at Gowkthrapple Low Rise.          
Undertake demolition at Allershaw Tower (tower demolition dates dependant on
new supply delivering the property for decant).          
Undertake demolition at Jackson Court.          
Undertake demolition at High Coats Tower (tower brought back into operation to
support Ukraine resettlement programme; dates for demolition will be agreed once
plan adopted for tenants currently located in this tower).          
Undertake demolition at Birkshaw Tower (tower brought back into operation to
support Ukraine resettlement programme; dates for demolition will be agreed once
plan adopted for tenants currently located in this tower).          
Undertake demolition of all towers in phase 2 programme (subject to change as
running order and speed of vacant properties becoming available). 
(June 2026 to November 2030)          
Deliverable:  Invest in cultural and heritage assets, including Summerlee and Rediscovering Airdrie heritage initiative, to increase community
pride and awareness of local heritage and make North Lanarkshire an attractive visitor destination. 
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Re-discover Airdrie (development phase - will need updated subject to full
funding for second phase)          
Communities
Committee
No previous
report
Cycle 4 of
2024
Undertake series of engagement exercises with local schools, community groups,
Community Boards, and North Lanarkshire based arts network.          
Develop and deliver focussed events to highlight the project and its ambitions.          
Develop a plan of physical interventions aimed at restoring and repurposing
heritage assets and improving the townscape.           Page 120 of 326

Page 121

Celebrate Summerlee (development phase - will need updated subject to full
funding for second phase)          
Communities
Committee
No previous
report
Cycle 4 of
2024
Undertake series of engagement exercises with local schools, community groups,
Community Boards, and North Lanarkshire based arts network.          
Work with a range of groups to gather stories and objects by working with new
communities and other marginalised groups such as those living in poverty,
LBGTQ+, women, and children.          
Develop and deliver focussed events to highlight the project and its ambitions.          
Develop plans for capital interventions, largely focusing on the extension of the
current miners’ row to establish a new miners’ village and welfare hall.          
Increase community pride through cultural heritage development           Communities
Committee
No previous
report
Cycle 4 of
2024 Continue to work with local community groups to support a range of initiatives to
celebrate local history.           
Programme of Work: Invest in North Lanarkshire
Senior Responsible Officer (SRO): Pamela Humphries (Depute SRO: James McKinstry) 
Deliverable: 
Establish a small multi-disciplinary team, comprising planning, roads, estates, enterprise, protective services, building standards,
and legal, to deliver a Pilot project to provide an enhanced and co-ordinated advisory service to developers and prospective
investors to help improve / streamline the statutory consent process and maximise potential economic benefits. 
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Complete pilot project and undertake evaluation and feedback to inform the next
steps.          
See Note 6.
Deliverable: 
Based on learning from the Pilot and wider market engagement, review and develop proposals for an effective future operating
model to make best use of available resources, including charging for the enhanced Pre App service, and streamlining the
process for obtaining statutory consents. 
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Complete stakeholder engagement and review of good practice from elsewhere.           Policy and Strategy
Committee
No previous
report
Cycle 1 2025
Develop proposed future operating model including proposed fees and
performance measures, and progress any necessary approvals for changes to
staff structures.          
Complete review of end-to-end process for statutory consents and amend
processes, procedures, and guidance to improve efficiency and streamline the
consent process.          
Page 121 of 326

Page 122

Deliverable: 
Develop a Gate Check process for all major council investment projects, where statutory consents required, to ensure projects
get the necessary input from relevant services at an early stage and avoid potential increased costs and/or delays at a later
stage. 
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Complete gate check process in consultation with relevant internal stakeholders
and incorporate within project management guidance and relevant project
approval processes.          
See Note 6.
Deliverable:  Support delivery of allocated sites within the Local Development Plan through development of effective delivery plans.  
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Incorporate this activity within the future operating model considerations for the
Invest in North Lanarkshire team.          
Planning Committee No previous
report
Cycle 4 2024
Deliverable:  Co-ordinate development of masterplans / development briefs and appraisal process for major council owned development
sites.   
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Incorporate this activity within the future operating model considerations for the
Invest in North Lanarkshire team.          
See Note 6.
Deliverable:  Review and develop process for the co-ordination of inward investment / business growth enquiries, including development of
Customer Relationship Management (CRM) system.  
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Develop and implement new CRM system to record and better co-ordinate
business engagement and growth enquiries and measure outcomes.          
Enterprise and Fair
Work Committee
No previous
report
Cycle 3 2024 
Programme of Work: Sustainable Futures
Senior Responsible Officer (SRO): James McKinstry (Depute SRO: Lyall Rennie) 
Deliverable:  Develop a route map to net zero to provide an outline strategy as to how the council will move to net zero (including outline costs,
timeframe, and review periods). 
Energy efficiency 
and generation
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Page 122 of 326

Page 123

Develop a pathway that will outline how the council could achieve net zero
greenhouse gas emissions, including development of a climate action team,
consideration of the appointment of a net zero partner, establishing baseline data,
and reviewing and developing intelligence and information in relation to this area.          
Environment and Climate
Change Committee
No previous
report
Cycle 1 of
2025
Deliverable: 
Undertake research with a potential energy partner to explore renewable energy and hydrogen generation projects as commercial
opportunities in North Lanarkshire. This will include examining the business case for the delivery of larger scale energy generation
/ hydrogen production and the delivery of smaller energy projects, including the introduction of solar farms on closed landfill sites
and energy storage options adjacent to electrical sub-stations.
Energy efficiency 
and generation
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Establish and implement solar meadows at Auchinlea and Dalmacoulter closed
landfill sites and work with the energy providers to agree the next steps.          
Environment and Climate
Change Committee
Cycle 4 of
2022
Cycle 4 of
2024
Undertake an energy feasibility study considering options for the council to
generate / produce its own energy.          
No previous
report
Cycle 3 of
2025
Deliverable:  Improve asset sustainability through the development of the Live Labs 2 project to deliver more sustainable road surfacing, deliver
a social enterprise pilot for environmental services, and increase recycling facilities across the area.
Energy efficiency 
and generation
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Upgrade and improve communal recycling points / nodes to improve customer
service, decrease contamination, and increase waste recycling.          
Environment and Climate
Change Committee
Cycle 4 of
2023
Cycle 4 of
2024
Implement upgrades to the council's recycling centres to enable the acceptance of
tipper vehicles and meet statutory obligations in terms of the persistent organic
pollutants legislation.          
Cycle 4 of
2023
Cycle 4 of
2024
Identify new material innovations used within road construction that use less
carbon (i.e. Live Labs 2 decarbonisation of roads) and develop a review process
that is supported and used by the industry.          
Cycle 1 of
2023
Cycle 3 of
2024
Consider and propose alternative delivery options for front line services in
conjunction with community organisations and community empowerment
requirements to help communities do things for themselves.          
Environment and Climate
Change Committee
No previous
report
Cycle 4 of
2026
Deliverable:  Explore green energy funding options which will assist in the move towards net zero, for both council assets and businesses
within North Lanarkshire.
Energy efficiency 
and generation
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Launch a net zero Business Challenge Fund which enables small to medium sized
enterprises to bid for up to £15,000 funding in order to reduce emissions and make
their operations more sustainable.          
Enterprise and Fair Work No previous
report
Cycle 1 of
2024
Page 123 of 326

Page 124

Deliverable: 
Deliver low carbon North Lanarkshire assets through the delivery of Local Heat and Energy Efficient Strategy (LHEES), Energy
Efficiency Standard for Social Housing (EESSH), decarbonisation of the council transport fleet, introduction of electrical vehicle
charging infrastructure across North Lanarkshire, and introduction of a waste transfer station and material recovery facility.
Energy efficiency 
and generation
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Develop and publish a North Lanarkshire Local Heat and Energy Efficiency
Strategy (LHEES) and Delivery Plan in order to meet the council's statutory duties.          
Environment and Climate
Change Committee
Cycle 4 of
2023 (Policy
and Strategy
Committee)
Cycle 1 of
2025
Deliver the net zero led transformation of the visitor gateway at Strathclyde Park
through innovative renewables led transformation of the current 1970s Watersports
Centre building into a low/no carbon health and education hub.          
Cycle 3 of
2023
Cycle 3 of
2024
Develop and deliver energy efficiency projects within the council's non-domestic
buildings via the non-domestic Energy Efficiency Framework.          
Cycle 1 of
2023
Cycle 1 of
2024
Implement a vehicle replacement programme to assist the council in meeting its
low or zero emission targets and consider potential alternative fuel options.          
Cycle 4 of
2022
Cycle 4 of
2024
Review and assess the Glasgow City Region electric vehicle charging
infrastructure proposal in order to establish the best approach for the council
(including delivery of the Eco Hub at the Bellshill depot).          
Cycle 4 of
2022
Cycle 4 of
2024
Appoint a contractor to extend, operate, and maintain the council's electric vehicle
charging infrastructure, in partnership with the Glasgow City Region authorities.          
Cycle 3 of
2023
Cycle 3 of
2024
Investigate suitable sites to implement waste streams for the council (before
onward processing) along with a Material Recovery Facility (MRF) in order to
improve efficiency of the service, reduce contamination, increase waste recycling,
and reduce costs.          
Cycle 4 of
2023
Cycle 4 of
2024
Ensure adequate charging infrastructure in place at depots, offices, and hubs to
accommodate the transition to zero emissions.           
Cycle 4 of
2022
Cycle 4 of
2024
Develop and implement a plan to ensure that all council owned houses achieve a
minimum Energy Performance Certificate rating of D by December 2025.           
Housing Committee Cycle 4 of
2023
Cycle 2 of
2024
Develop and implement a plan to ensure that all council owned houses achieve
Energy Performance Certificate rating of B, or to be as energy efficient as possible,
by December 2032. 
Cycle 4 of
2023
Cycle 2 of
2024
Develop and implement a plan to ensure that all council owned houses have works
carried out to support the council's plan to achieve net zero status by 2045
including the decarbonisation of all heating (e.g. replacement of gas heating with a
net zero system).          
Cycle 4 of
2023
Cycle 2 of
2024
Implement the Energy Audit Voucher scheme (maximum grant value of £2,500) to
enable small and medium-sized enterprises to reduce their energy bills or improve
how they use their energy.          
Enterprise and Fair Work
Committee
Cycle 4 of
2022
See Note 6.
Page 124 of 326

Page 125

Implement the expert help scheme which provides small and medium-sized
enterprises with up to five days of fully funded specialist business advice on
energy efficiency and net zero topics.          
Cycle 3 of
2022
See Note 6.
Deliverable: 
Prepare a Climate Adaptation Plan (and budget) to mitigate climate change which will include nature-based restoration,
biodiversity enhancements, flood reduction, community empowerment, better asset design, and effective water management
measures to ensure North Lanarkshire's residents and the council's investments are properly protected for future generations.
Climate adaptation
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Prepare and deliver a resourced Climate Adaptation Plan, including biodiversity
enhancements, in order to enhance the council's resilience to the current and
future changes in the climate and respond to the ecological crisis.          
Environment and Climate
Change Committee
No previous
report
Cycle 1 of
2025
Deliverable:  Develop nature-based adaptations which will centre around the Country Parks for the Future programme and the Clyde Climate
Forest. Climate adaptation
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
As part of the 10-year masterplans, establish and implement a delivery plan to
create a shift in the way communities use their parks and greenspace from passive
leisure use to active and engaged community involvement, which will deliver
improvements in health, wellbeing, and social outcomes.          
Environment and Climate
Change Committee
Cycle 3 of
2023
Cycle 3 of
2024
Develop and implement an annual nature recovery programme, which delivers
habitat restoration, freshwater restoration and eradication of invasive non-native
species negatively impacting on nature.          
Cycle 4 of
2023
Cycle 4 of
2024
Participate in the Clyde Climate Forest City Region tree planting project, which
aims to increase tree cover in areas most likely to be negatively impacted by
climate change and see around 18 million trees being planted in the city region
over the next decade, increasing woodland cover in the city region from 17% to
20%. 
Cycle 4 of
2022
Cycle 3 of
2024
Deliverable:  Improve North Lanarkshire's assets to be climate resilient with a focus on flood prevention measures. Climate adaptation
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Develop and implement a tree risk asset management strategy, including
establishing the full extent and condition of assets and enable a regime of
proactive management.          
Environment and Climate
Change Committee
Cycle 3 of
2023
Cycle 3 of
2024
Develop a burial space strategy to deliver replacement cemeteries and extended
cemeteries, in order to meet the council's statutory requirement to provide
sufficient burial space and to do so within a reasonable distance of each          
Cycle 3 of
2023
Cycle 4 of
2024
Page 125 of 326

Page 126

community in order to tackle funeral poverty and enable bereaved families to visit
graves regularly and without undue cost.
Deliver a new cemetery at Pather Farm in Wishaw, and additional capacity at
existing Coltswood Cemetery in Coatbridge, and develop extension / new
cemetery for Coatbridge, with a cemetery extension in New Monkland.          
Deliver flood risk management and develop plans across the local authority area,
in accordance with the Clyde and Loch Lomond Local Flood Risk Management
Plan, to enable the council to reduce the risk of flooding and meet its statutory
obligations in terms of the Flood Risk Management (Scotland) Act 2009.          
No previous
report
Cycle 3 of
2024
Deliverable:  Reduce climate impact inequalities including delivery of the actions within the council's Air Quality Action Plan. Climate adaptation
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Progress the pledges outlined in the council's Air Quality Action Plan, examples of
which include an active travel strategy (getting people out of cars and providing a
network which will enable people to get about North Lanarkshire and beyond by
active means), investigating air quality around schools, improving air travel options
to community hubs, and ensuring air quality has greater importance in the council’s
procurement and contract processes, in order to fulfil the council’s statutory
responsibilities in terms of local air quality management.          
Environment and Climate
Change Committee
Cycle 2 of
2023
Cycle 3 in
2028
Deliverable: 
Engage all stakeholders in climate adaptation decision making and delivery, with a focus on young people. This will be driven
through the council's Climate Action Plan which will be reviewed to reflect the works being undertaken across this Programme of
Work and others.
Climate adaptation
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Engage schools in climate change campaigns (specifically Earth Hour) to increase
awareness and involvement.          
Environment and Climate
Change Committee
No previous
report
Cycle 1 of
2025
Co-ordinate and deliver activities to enable North Lanarkshire to maintain its
Fairtrade zone status, which was awarded in recognition of the support and
awareness the local schools, churches, businesses, and communities have
provided in order to increase the uptake of fair-trade products. 
Cycle 4 of
2023
See Note 6.
Provide financial support, via three business grant schemes, to new and existing
businesses to help them trade in a more environmental and sustainable way to aid
their businesses growth and improve the sustainability of their operations.          
Cycle 2 of
2023
See Note 6. 
Page 126 of 326

Page 127

Programme of Work: Resilient People
Senior Responsible Officer (SRO): Alison Gordon (Depute SRO: Stephen Llewellyn) 
Deliverable:  Develop and deliver integrated offer of early practical, emotional, and financial support aligned to the community hubs to ensure
the right support at the right time to individuals and families.
Accessible and inclusive
family support
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Use Whole Family Wellbeing Funding (WFWF) to procure universal early help
service aligned to new operating model.          
Education, Children, and
Families Committee 
Cycle 3 of
2023
Cycle 1 of
2024
Engage and work with local families, staff, and providers to implement and embed
new commissioned early help service within new operating model and hub roll out.          
Cycle 3 of
2023
Cycle 2 of
2024
Review current offer of family support across all council services and develop
proposals for sustainable, flexible, and responsive whole family support within new
operating model.          
Cycle 3 of
2023
Cycle 2 of
2024
Build on success of direct payment initiatives to enable workforce to use cash first
approach as part of the family support offer to prevent crisis and meet need.          
Cycle 3 of
2023
Cycle 4 of
2025
Create economic opportunities for families by developing employment pathways
through the universal early help service.          
Cycle 3 of
2023
Cycle 4 of
2025
Deliverable: 
Establish a no wrong door approach to deliver early family support using continuous evaluation and co-production to develop a
sustainable and effective model for the future built on the principles of the Promise, GIRFEC (Getting it Right for Every Child), and
GIRFE (Getting it Right for Everyone).
Note, the wording on this deliverable was amended in order to avoid the wrong message being cascaded through the use of the
“single point of contact” terminology, “no wrong door” is a more appropriate way for this to be phrased.  The deliverable was also
amended to recognise the alignment required to GIRFEC and GIRFE.  The deliverable previously read “Introduce a single point of
contact to deliver early support in up to 14 community / town hubs in the first phase of the programme, using continuous
evaluation and co-production to develop a sustainable and effective model for the future built on the principles of the Promise”.
Accessible and inclusive
family support
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Engage with families, communities, staff, and providers to create local access to
whole family support within new operating model as a core component of
community and town hub roll out programme.          
Education, Children, and
Families Committee
Cycle 3 of
2023
Cycle 2 of
2024
Engage with One Service Programme of Work to pilot the integration of functions
within the town and community hub roll out programme to create points of contact
that can provide the support or advice families need.          
Cycle 3 of
2023
Cycle 2 of
2024
Ensure a no wrong door approach by embedding developments in whole family
support within the GIRFEC (Getting it Right for Every Child) and GIRFE (Getting it
Right for Everyone) approaches in order that families receive the right support
wherever they ask for it.          
Cycle 3 of
2023
Cycle 2 of
2024
Page 127 of 326

Page 128

Develop a communication plan in order that the values, principles, and purpose of
whole family support is understood across workforce and communities.          
Cycle 3 of
2023
Cycle 2 of
2024
Introduce a point of contact for families in up to 14 community / town hubs in the
first phase of the programme as part of the no wrong door approach.          
Cycle 3 of
2023
Cycle 2 of
2024
Create an all-age carer working group to explore and resolve issues and
challenges currently facing carers.           
Adult Care and Social
Work Committee / Health
and Social Care
Integration Joint Board
Cycle 4 of
2022
Cycle 2 of
2024
Identify any gaps in the current carer support offered by the council, via feedback
from children, young people, and their families / carers and establish any current
improvement activities in these areas, particularly in relation to the transition from
children to adult services; use this data to identify opportunities to build on and
better connect improvement activity across education, health, and social work.          
Cycle 4 of
2022
Cycle 2 of
2024
Consult with parent, carers, and families to ensure a specific section relating to
parent / carers in the refreshed Local Carers Strategy.          
Cycle 4 of
2022
Cycle 2 of
2024
Deliverable:  Implement GIRFE (Getting it Right for Everyone) approach in adult services to improve pathways to support. Accessible and inclusive
family support
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Implement a place based back to basics locality approach that ensures a clear
pathway for people that supports empowerment and aligns with whole family
support.          
Adult Care and Social
Work Committee / Health
and Social Care
Integration Joint Board
Cycle 3 of
2023
Cycle 2 of
2024
Implement a sticky person approach, which is to identify a lead person to assess
and engage others to ensure the right response where needed, thus reducing
multiple referrals. 
Implement the plan to strengthen the approach across Health and Social Care
services to support the council as a learning organisation which keeps the person
at the centre and fits with the principles of Human Learning and GIRFE. 
Refresh the Engagement and Participation Strategy to support strong voices, and
promote independence and connections.          
Deliverable:  Introduce the Signs of Safety in children's services as a transformative approach to strengthening families and addressing risks of
harm.
Accessible and inclusive
family support
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Lead the Signs of Safety cohort / working group established to take forward the
implementation plan including oversight of a comprehensive training programme
for the council and partners.          
Education, Children, and
Families Committee
No previous
report 
Cycle 2 of
2024
Use the Signs of Safety evaluation framework throughout the implementation
period in order to measure impact.           
Cycle 2 of
2024
Page 128 of 326

Page 129

Review and update existing procedures and operating models across the council
and partners, where appropriate, to incorporate the values, principles, and practice
of Signs of Safety and embed the approach.          
Cycle 2 of
2024
Deliverable:  Embed the Close to Home initiative in both adult and children's services to ensure that people benefit from effective support,
connections, and opportunities with their own communities.
Accessible and inclusive
family support
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Use of Whole Family Wellbeing Funding (WFWF) to enhance supports at
additional and intensive levels to support and sustain children in kinship care and
additional support needs at home.          
Education, Children, and
Families Committee
Cycle 3 of
2023
Cycle 2 of
2024
Invest in family group decision making and lifelong links to facilitate sustainable
and creative solutions that enable children and young people to be cared for in
North Lanarkshire.          
Cycle 3 of
2023
Cycle 2 of
2024
Continue to embed and evaluate improvements in integrated approaches to
planning for children and adults with complex needs to further reduce the need for
placement outwith North Lanarkshire.          
Education, Children, and
Families Committee /
Adult Care and Social
Work Committee
No previous
report
Cycle 2 of
2024
Deliverable:  Implement a comprehensive new Tackling Poverty Strategy (2023-26) as the vehicle to continue to reduce child poverty, address
inequalities, and support active citizenship and growth.
Tackling poverty and
preventing homelessness
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Deliver the Tackling Poverty Strategy Towards a Fairer North Lanarkshire 2023 to
2026.          
Wellbeing and Tackling
Poverty Committee / 
Policy and Strategy
Committee
Cycle 3 of
2023
Cycle 3 of
2024
Deliverable:  Evaluate the impact of the 2023-26 Strategy and Action Plan and develop a revised Tackling Poverty Strategy for 2026-29. Tackling poverty and
preventing homelessness
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Deliver and review the Tackling Poverty drivers in respect of income from
employment, holistic support, reducing the cost of living, income from benefits, and 
supporting the plan.          
Wellbeing and Tackling
Poverty Committee / 
Policy and Strategy
Committee
Cycle 3 of
2023
Cycle 3 of
2024
Develop Tackling Poverty Strategic Performance Framework measurements.          
Deliverable: 
Embed anti-poverty approaches within all service delivery with a particular focus on universal services, strengthening pathways to
support from health and education and using Multiply and MACA (money advice and consumer advice) to empower young people
and individuals.
Tackling poverty and
preventing homelessness
Page 129 of 326

Page 130

Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Deliver a rolling programme of poverty sessions across all council services to raise
awareness.          
Wellbeing and Tackling
Poverty Committee 
Cycle 3 of
2023
Cycle 3 of
2024
Develop a rolling programme of anti-poverty approaches within all service delivery
with a focus on universal services, advice, information and representation,
maximising residents’ income, provision of money advice, and maintaining /
introducing new referral pathways to all services. 
Provide financial education in primary, secondary, and additional support needs
schools via the MACA (money advice and consumer advice) project.           
Deliverable: 
Review and redesign housing support services for people experiencing (or at risk of) homelessness to ensure housing support
services align with the new Prevention duties and provide flexible, strength-based support to help people successfully sustain
their accommodation and achieve positive wider life outcomes.
Tackling poverty and
preventing homelessness
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Review the Temporary Accommodation Strategy, including gathering information
on other local authority models and examples of best practice, collation and
analysis of internal data and an options appraisal, in order to provide support to
enable people to successfully sustain their accommodation and achieve positive
wider life outcomes.          
Housing Committee Cycle 4 of
2021
Cycle 1 of
2025
Deliverable: 
Implement a new crisis response and assertive outreach service in partnership with North Lanarkshire's Alcohol and Drug
Partnership to provide immediate assistance to people experiencing homelessness or at risk of homelessness in need of an
urgent response (outwith current service provision) to prevent and reduce recurring homelessness and improve access to support
and services.
Tackling poverty and
preventing homelessness
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Develop and implement a plan for the creation of a new crisis response and
assertive outreach service, in partnership with North Lanarkshire's Alcohol and
Drug Partnership and appointed service provider, to provide support and
assistance to people experiencing or at risk of homelessness.          
Housing Committee Cycle 4 of
2023
Cycle 4 of
2024
Deliverable:  Review the Temporary Accommodation Strategy to identify current and future temporary accommodation requirements, giving key
consideration to the implementation of the Rapid Rehousing Transition Plan.
Tackling poverty and
preventing homelessness
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Page 130 of 326

Page 131

Review the Temporary Accommodation Strategy, in conjunction with appointed
consultant, to identify current and future temporary accommodation requirements
and provide appropriate recommendations for future strategy.          
Housing Committee Cycle 3 of
2017
Cycle 2 of
2024
Deliverable:  To explore innovative ways to extend the reach of the Scottish Welfare Fund to assist people who are homeless or at risk of
homelessness, recognising the importance of furniture provisions in aiding positive tenancy sustainment outcomes.
Tackling poverty and
preventing homelessness
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Implement fast track system for community care grants for homeless households
in temporary accommodation to enable swifter move into permanent
accommodation and free up temporary accommodation.          
See Note 6.
Explore criteria and options for furniture fund expansion to key target groups.          
Establish short-life working group to review procedures and processes to improve
access to furniture to support tenancy sustainment.          
Deliverable:  Develop the council's approach to Community Wealth Building and associated implementation plan to strengthen community
capacity and wellbeing.
Strengthening community
capacity and wellbeing
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Develop shared partnership understanding and partnership approach to
progressing community wealth building.          
Enterprise and Fair Work
Committee
Cycle 2 of
2023
Cycle 3 of
2024
Undertake wider engagement with the community and voluntary sector, local
communities, businesses, and Elected Members to inform the approach and
ensure understanding and buy in. 
Finalise a Community Wealth Building Statement and implementation plan,
including an appropriate reporting schedule and monitoring arrangements.          
Deliverable:  Embed equalities approaches and actions across all work with communities to maximise the influence, participation, and voice of
all North Lanarkshire's citizens in the development of communities and services.
Strengthening community
capacity and wellbeing
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Work with the North Lanarkshire Community Planning Partnership to publish a
Partnership Communication Strategy.          
Communities Committee Cycle 3 of
2023
Cycle 3 of
2024
Sign up to and support implementation of the North Lanarkshire Partnership
Community Agreement being developed by VANL to strengthen partnerships and
approaches to working with the community and voluntary sectors.          
Cycle 4 of
2022
Cycle 3 of
2024
Review engagement resource / guides available to enable and build capacity
across key staff expected to support meaningful and honest dialogue with
communities. 
No previous
report
Cycle 4 of
2024
Page 131 of 326

Page 132

Ensure action at a local level to strengthen representation of equalities groups in
local engagement and delivery of Local Outcome Improvement Plan (LOIP)
priorities, linked to the council's equalities duties.          
No previous
report
Cycle 3 of
2024
Deliverable:  Strengthen engagement, participation, and empowerment across communities to develop an integrated service offer that meets
the needs of communities.
Strengthening community
capacity and wellbeing
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Ensure the councils approach to volunteering supports and aligns with delivery of
the North Lanarkshire Partnership Volunteering Strategy.          
Finance and Resources 
Committee
Cycle 2 of
2022
See Note 6.
Progress key actions to strengthen the role of the community and voluntary sector
in the delivery of services and activities associated with the Local Outcome
Improvement Plan (LOIP) priorities. 
Communities Committee No previous
report
Cycle 1 of
2024
Identify opportunities to resource community resilience to respond to adversity or
emergency situations, building on initial progress.          
Communities Committee Cycle 3 of
2023
Cycle 4 of
2024
Strengthen connections between locality community planning and health and
social care groups to ensure a focus on delivery of the Local Outcome
Improvement Plans (LOIPs).          
Communities Committee No previous
report
Cycle 4 of
2024
Engage with communities across the nine Community Board areas to empower
them and help to build their capacity in further support of improving the local
approach to community ownership and management of assets.          
Policy and Strategy
Committee
No previous
report
Cycle 2 of
2024
Build capacity in communities to support advanced planning for future health and
care needs.          
Adult Care and Social
Work Committee / Health
and Social Care
Integration Joint Board
Performance, Finance,
and Audit Committee
Cycle 3 of
2023
Cycle 2 of
2024
Deliverable:  Develop a comprehensive local Trauma Plan to ensure that trauma informed practice and systems are embedded within the
council's operating model.
Strengthening community
capacity and wellbeing
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Agree a project brief for creating the framework for North Lanarkshire becoming a
trauma-informed organisation.           
Wellbeing and Tackling
Poverty Committee
Cycle 2 of
2023
Cycle 2 of
2024
Create a trauma steering group of key managers from across council services to
oversee the project and develop and implement the trauma plan across the
council.          
Create and embed understanding across council management teams to ensure
awareness of the council's commitment to become trauma informed as an
organisation.  Page 132 of 326

Page 133

Identify areas and teams to test trauma informed approaches.          
Deliverable: 
Implement the Trauma Plan with a focus on creating the culture and conditions across the council to enable staff to respond in
ways which recognise the impacts of trauma, promote recovery, prevent re-traumatisation, and ensure services and effective
supports are accessible to / effective for those who need them most.
Strengthening community
capacity and wellbeing
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Strengthen staff care, support, and wellbeing through the integration of trauma-
informed principles within the council's Mental Health and Wellbeing Strategy.          
Wellbeing and Tackling
Poverty Committee
Cycle 2 of
2023
Cycle 2 of
2024
Promote the awareness, confidence, and skills of staff to use the principles of
trauma informed practice through the integration of trauma principles in training
and development.          
Ensure children, families, and communities are involved in the design of trauma
informed services           
Positively influence the design and environment of schools, town centres,
community hubs, and service delivery locations by embedding the principles of
trauma design.          
Develop a framework for measuring impact of trauma-informed principles for staff
and people who use services.          
Equip managers with the knowledge of principles trauma informed leadership in
order to support the workforce respond sensitively and effectively to individuals
using council services who are affected by trauma.          
Deliverable: 
Identify capacity to increase proportionate spend of prevention to support improved outcomes for children and their families and
development of a sustainable service model for the future.
Note, the wording on this deliverable was amended as all three previous deliverables resulted in the same or similar delivery
requirements so were amalgamated and amended to avoid duplication and ensure clarity.  The deliverables previously read: 
- “Engage with national Promise team in the HECM (Human and Economic Cost Modelling) project to scope spend on key
service elements, and to identify capacity to increase proportionate spend on prevention to support improved outcomes for
children and their families and the development of a sustainable service model for the future”. 
- “Undertake a baseline costed analysis of individual journeys through support and services, comparing outcomes and costs of
the traditional service approach and the potential within the new operating model to support sustainable service design”.
- “Scope and identify current spend on family support and proportion of temporary / base budget funding with a view to
maximising potential for budget integration in support of key priorities and to addressing sustainability challenges should
temporary funding be withdrawn”. 
Investing in prevention
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Engage with national Promise team to develop method to analyse Human and
Economic Cost (HECM) of family support.          
Education, Children, and
Families Committee
Cycle 3 of
2023
Cycle 3 of
2024
Page 133 of 326

Page 134

Create baseline costed analysis of individual journeys through support and
services using HECM analysis of families accessing support within current service
model.          
Identify and cost current spend of family support functions across the council,
including risks linked to temporarily funded services.          
Apply HECM to analyse impact of new operating model and compare outcomes
and costs of the traditional service approach and the potential within the new
operating model to support sustainable service design.          
Develop costed and sustainable proposals for integrated family support offer
delivered through the new operating model that shifts investment from crisis and
intensive services to early intervention and prevention.          
Deliverable:  Map and enhance existing cash first and direct payments initiatives through establishment of a supporting framework aligned with
family support principles to reduce stigma and empower families and frontline workforce to tailor solutions to need. Investing in prevention
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Provide a cash first approach to food crisis, overcome the barrier identified to the
food poverty referral gateway, to investigate and implement uniformed recording
measures across emergency food providers and explore how emergency
payments are used across the council.          
Wellbeing and Tackling
Poverty Committee 
No previous
report 
Cycle 4 of
2023
Map all existing cash emergency payments provided by all council services to
create a directory for services and to support the direct payment initiatives.           
Establish a framework via piloting the (food crisis) cash first payment to support
the direct payment initiatives to reduce stigma and empower families and frontline
workforce to tailor solutions to need.           
Programme of Work: Brighter Futures
Senior Responsible Officer (SRO): Fiona Whittaker (Depute SRO: Gerard McLaughlin) 
Deliverable: 
Ensure increased skilled workforce employed in roles which fit industry needs and contribute to greater economic outputs.
Note, the wording on this deliverable was amended because this deliverable is more than about just increasing the availability of
the workforce, it is about ensuring that the workforce is appropriately skilled to meet the needs and challenging workforce gaps
from employers within key industries.  The deliverable previously read: “Increase availability of workforce employed in roles which
fit industry needs and contribute to greater economic outputs”.
NL academies
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Deliver and evaluate NL Academies UK Shared Prosperity Fund) SPF projects (up
to end of funding in March 2025).            
Finance and Resources
Committee
Cycle 3 of
2023
Cycle 2 of
2024
Page 134 of 326

Page 135

Integrate summer placements scheme for S4-6 pupils into NL Academy model with
external placement opportunities.          
Cycle 3 of
2023
Cycle 2 of
2024
Develop university strategic partnerships linking these to industry need providing
pathways towards employment.          
Cycle 3 of
2023
Cycle 2 of
2024
Evaluate next steps to 2028.           Cycle 3 of
2023
Cycle 2 of
2024
Deliverable:  Expand pathways and progression routes within key industry sectors to connect to employment. NL academies
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Establish a plan, via the vocational education multi agency steering group, which
will refresh and relaunch the enterprise curriculum, pathways, and certification in
order to progress and facilitate growth and expansion of Foundation
Apprenticeships, Higher National Certificates, and vocational education in growth
job sectors.          
Education, Children and
Families Committee
Cycle 3 of
2023
Cycle 2 of
2024
Deliverable:  Develop employer engagement within each model to ensure full participation and increased work opportunities. NL academies
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Develop a funding model to sustain the NL Academy model working with industry
and relevant partners.          
Finance and
Resources Committee
Cycle 3 of
2023
Cycle 2 of
2024
Commission, commence, and continually support industry led sector boards within
each NL Academy area (Built Environment, Health and Social Care, and Digital).          
Finance and
Resources Committee
Cycle 3 of
2023
Cycle 2 of
2024
Evaluate next steps to 2028.           Finance and
Resources Committee
Cycle 3 of
2023
Cycle 2 of
2024
Deliverable:  Enhance attraction and advance equalities across key industry sectors. NL academies
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Assess and develop a collaborative apprenticeship approach across each NL
Academy area (Built Environment, Health and Social Care, and Digital).          
Finance and
Resources Committee
Cycle 3 of
2023
Cycle 2 of
2024
Implement and monitor attraction, recruitment, and retention workstreams under
each industry led sector board.          
Finance and
Resources Committee
Cycle 3 of
2023
Cycle 2 of
2024
Evaluate next steps to 2028.           Finance and
Resources Committee
Cycle 3 of
2023
Cycle 2 of
2024
Deliverable:  Grow full range of school vocational pathways for core sectors, including STEM (science, technology, engineering, and
mathematics), digital skills, construction, and health and social care.
Brighter futures curriculum
and pathways
Actions  Indicative timescales for delivery Indicative reporting schedule Page 135 of 326

Page 136

2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Create other vocational pathways to increase wider achievement opportunities
which target young people, increase additional opportunities available through
Future Fridays and build upon the existing progression pathways available for
literacy, numeracy, digital literacy, and computing. 
Education, Children
and Families
Committee
Cycle 3 of
2023
Cycle 2 of
2024
Deliverable:  Advance equalities within curriculum pathways 3-18 years. Brighter futures curriculum
and pathways
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Develop and implement a plan, via the advancing equalities forum, to advance
equalities within curriculum pathways, including the recruitment of job coaches for
young people with additional support needs to prepare them for life beyond school
and the world of work, and developing the National Certificate curriculum rationale
to include equalities and provide training for all Heads of Establishment.          
Education, Children
and Families
Committee
Cycle 3 of
2023
Cycle 2 of
2024
Deliverable:  Map, develop, and implement play-based approaches in early years to develop a full play-based learning offer. Brighter futures curriculum
and pathways
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Establish a focus group to develop play-based approaches in early years and map
the play-based approaches currently available within early years and primary.          
Education, Children
and Families
Committee
Cycle 3 of
2023
Cycle 2 of
2024
Deliverable:  Drive the recovery of North Lanarkshire’s labour market to pre-covid levels and report on local labour market.
Employability and
community learning and
development
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Provide updates from local employability partners on local labour market including
comparisons with pre covid labour market.          
Enterprise and Fair
Work Committee
Cycle 2 of
2023
Cycle 2 of
2024
Deliverable:  Ensure continued expansion of supported employment programmes, increase opportunities for North Lanarkshire Industries to
diversify and integrate these with wider employability support.
Employability and
community learning and
development
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Page 136 of 326

Page 137

Develop and implement an Action Plan for North Lanarkshire Industries for 2024-
26.          
Enterprise and Fair
Work Committee
Cycle 4 of
2023
See Note 6.
Deliverable:  Develop and embed the Employer Charter within a broader range of businesses.
Employability and
community learning and
development
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Review delivery of charter and delivery of networking event for employers and
evaluate next steps until 2028.          
Enterprise and Fair
Work Committee
No previous
report
Cycle 1 of
2024
Deliverable:  Ensure integration of external employability funding with council led programmes via Local Employability Partnership.
Employability and
community learning and
development
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Deliver and evaluate two employability support UKSPF projects (up to end of
funding in March 2025) and integrate with Scottish Government funds.          
Enterprise and Fair
Work Committee
Cycle 2 of
2023
Cycle 2 of
2024
Deliverable:  Establish volunteer baseline, covering current activity, training received, and availability for broader opportunities. Volunteering
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Engage with services in the council to understand the use of volunteers, and meet
with community groups, Community Boards, and VANL to understand existing
demand and potential for growth.          
Communities
Committee
Cycle 4 of
2023
Cycle 4 of
2024
Deliverable:  Map community partnerships who offer volunteering opportunities and the current offer (baseline). Volunteering
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Develop volunteer role profiles and gather details on opportunities, forthcoming
projects / events for signposting to interested volunteers.          
Communities
Committee
Cycle 4 of
2023
Cycle 4 of
2024
Deliverable:  Implement and maintain a system capable of capturing volunteers, skills, training, and opportunities available. Volunteering
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Develop volunteer management system secured (Rosterfy) and initiatives to
support development and recognise contribution, focusing on gaining qualifications
which will help with career development (e.g. sports coaching badges).          
Communities
Committee
Cycle 4 of
2023
Cycle 4 of
2024
Page 137 of 326

Page 138

Deliverable:  Implement and maintain a front-end website (one stop shop) for volunteering in North Lanarkshire. Volunteering
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Develop QR codes for the Roserfy volunteer management system to improve
accessibility from a range of council venues and service delivery points.          
Communities
Committee
Cycle 4 of
2023
Cycle 4 of
2024
Deliverable:  Map current entrepreneurship and self-employment provision across North Lanarkshire. Entrepreneurship
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Undertake mapping of all existing entrepreneurship support and activity taking
place across North Lanarkshire - provision, geography, and target groups.          
Enterprise and Fair
Work Committee
No previous
report
Cycle 3 of
2024
Review availability and access to finance for entrepreneurs and business start-ups
(including the council start-up grant).          
Cycle 2 of
2023
Cycle 3 of
2024
Evaluate the council's Business Support Funding (including Start-Up Funding).           No previous
report
Cycle 3 of
2024
Evaluate next steps to 2028.           No previous
report
Cycle 3 of
2024
Deliverable:  Develop entrepreneurship activities to drive activity where gaps and provision from the mapping exercise have been identified. Entrepreneurship
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Undertake options appraisal on future delivery of Business Gateway services.           Enterprise and Fair
Work Committee
Cycle 3 of
2023
Cycle 1 of
2024
Engage with South Lanarkshire Council, HR, and legal services to insource the
Lanarkshire Business Gateway services from 1 February 2024.          
Cycle 3 of
2023
Cycle 1 of
2024
Deliver, evaluate, and review the Lanarkshire Business Gateway service delivery
and wider business support services.          
Cycle 3 of
2023
Cycle 3 of
2024
Evaluate next steps to 2028.           Cycle 3 of
2023
Cycle 3 of
2024
Deliverable:  Advance equalities and deliver targeted entrepreneurial support to under-represented groups through bespoke interventions. Entrepreneurship
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Deliver tailored business start-up and support programme to Black, Asian, and
other Minority Ethnic people and groups (through UKSPF funding).          
Enterprise and Fair
Work Committee
Cycle 2 of
2023
Cycle 3 of
2024
Deliver Lanarkshire Women in Business Events Leadership and Mentoring
programme  (through UKSPF funding).          
Cycle 2 of
2023
Cycle 3 of
2024 Page 138 of 326

Page 139

Undertake delivery of pilot to establish dedicated co-working space for women
in Airdrie (through UKSPF funding).          
Cycle 2 of
2023
Cycle 3 of
2024
Deliver social enterprise support tender (through UKSPF funding) to support
creation of 30 new social enterprises.          
Cycle 2 of
2023
Cycle 3 of
2024
Explore opportunities for alternative inclusive ownership models in North
Lanarkshire (linked to community wealth building).          
Cycle 2 of
2023
Cycle 3 of
2024
Evaluate next steps to 2028.           No previous
report
Cycle 3 of
2024
Deliverable:  Expand experiential entrepreneurial activities and pathway programmes within education curriculum. Entrepreneurship
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Deliver enterprise pathway and enterprising schools award model within education
(including Commsworld / YES support, Dragons' Lair, Social Enterprise Academy,
and Business Gateway community benefits).          
Education, Children
and Families
Committee
Cycle 3 of
2023
Cycle 2 of
2024
Review success of enterprise pathways and enterprising schools award model.           Cycle 3 of
2023
Cycle 2 of
2024
Evaluate next steps to 2028.           No previous
report
Cycle 2 of
2024
Deliverable:  Identify all relevant funding streams and how they fit together. Funding and social value
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Carry out desktop exercise of all funding streams and how they align and
integrate.          
See Note 6.
Deliverable:  Identify different timescales for funding and any potential gaps and future opportunities. Funding and social value
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Engage with theme leads to identify any potential funding gaps that need to be
explored further and consider environmental scanning of funding landscape for
future opportunities.          
See Note 6.
Deliverable:  Identify community benefits opportunities linked to each theme. Funding and social value
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Engage with Programme of Work leads to discuss / determine community benefits
opportunities and how these will link to Brighter Futures.          
See Note 6.
Page 139 of 326

Page 140

Programme of Work: Digital North Lanarkshire
Senior Responsible Officer (SRO): Katrina Hassell (Depute SRO: Fiona Whittaker) 
Deliverable:  Create a mature and sustainable culture across the organisation to ensure that digitisation of council services provided to the
public successfully transition them to achieve the outcomes specified within The Plan for North Lanarkshire. 
Digital culture, leadership,
and knowledge
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Conduct management and technology research to understand current and future
state digital culture for the organisation.          
Finance and
Resources Committee
No previous
report
Cycle 4 of
2024
Understand the five steps to change in preparation for digital maturity assessment.          
Undertake digital maturity assessment with digital culture, leadership, and
knowledge activity group.          
Share Health and Social Care digital maturity data with the digital culture,
leadership, and knowledge activity group to inform the council's digital maturity
assessment.          
Consider wider staff survey as a follow-up to the digital skills survey from
November 2021 in order to gauge the extent of staff skills and gaps.          
Deliverable:  Develop digital leaders to facilitate behavioural change required to enable service transformation within existing resources.  Digital culture, leadership,
and knowledge
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Review research and current thinking into digital champions / leaders to
understand the skills required for a digital leader in order to build and lead teams,
keep people connected and engaged, and drive a culture of innovation, learning,
and continuous improvement and review leadership development programmes to
incorporate digital capabilities, including cognitive transformation (thinking
differently), behavioural transformation (acting differently), and emotional
transformation (reacting differently).          
Finance and
Resources Committee
No previous
report
Cycle 4 of
2024
Develop digital leadership core competency guide based on the research results
and linked to service requirements.           
Deliverable:  Develop and deploy a self-adapting redesign framework to accelerate digital business transformation of critical council
functions. 
Digital culture, leadership,
and knowledge
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Page 140 of 326

Page 141

Set up short life change management group to provide expertise, skills, and
knowledge of change across the council and North Lanarkshire in order to develop
a toolkit to sit beside the project management framework.          
Finance and
Resources Committee
No previous
report
Cycle 3 of
2024
Undertake self-assessment to look at the re-design pieces and feedback reviewed
by change management group.          
Deliverable:  Support development of a skilled workforce to foster consistent knowledge, improve digital adoption, and accelerate digital-first
business capabilities.
Digital culture, leadership,
and knowledge
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Invest in upskilling the council's workforce to be more digitally capable by creating
and developing a self-assessment tool to allow staff to understand their current
level of digital skills and undertake further learning as appropriate.          
Finance and
Resources Committee
No previous
report
Cycle 1 of
2025
Use the enhanced digital skills of the council's workforce to encourage a culture of
a digital-first approach (i.e. thinking of a digital solution) when faced with
opportunities or challenges to improve the way of work, which will result in
efficiency gains and improved customer service.          
Measure and evaluate impact of whole service / authority transformation change to
digitise systems (for example i-trent) to inform future user experience.          
Deliverable:  Ensure a connected / integrated digital experience to facilitate users to transition to efficient digital and hub-based services and
become empowered to be self-managing and digitally active. 
Improved customer
experience
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Develop systems and portals to enable residents to engage, report, request, and
pay for services.          
Communities
Committee
No previous
report
Cycle 2 of
2024
Implement a chat bot functionality to enable residents to receive automated
responses or to chat to an advisor.          
Finance and
Resources Committee
No previous
report
Cycle 1 of
2024
Implement a customer relationship management system to enable staff to route
enquiries to the relevant service and encourage cross service working.          
Communities
Committee
Cycle 4 of
2022 (Policy
and Strategy
Committee)
Cycle 2 of
2024
Design and develop artificial intelligence capable of generating text, images, or
other media (using generative models) to enable the implementation of chatbot
functionality.          
Communities
Committee
Cycle 2 of
2024
Establish a roadmap to identify the redesign requirement for services to support
the transition to the council’s future operating model in hubs.          
Communities
Committee
Cycle 3 of
2024
Redesign the council’s purchase to pay system to introduce a standardised
approach and enable electronic invoicing.          
Finance and
Resources Committee
Cycle 3 of
2024
Deliverable:  Implement smart community hubs to improve access to omni-channel, digitally enabled services, and experiences.  Improved customer
experience Page 141 of 326

Page 142

Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Develop model to enable customers to sign up for online services and establish
required resourcing to increase engagement and usage of online services.          
Communities
Committee
Cycle 1 of
2023 (Policy
and Strategy
Committee)
Cycle 2 of
2025
Review and implement technology solutions to support customers with additional
needs to ensure there are no barriers to accessing digital services.          
No previous
report
Further develop community use of immersive experience pods which enhance
digital experiences within a community and beyond and evaluate the impact on
community groups.          
Cycle 4 of
2022 (Policy
and Strategy
Committee)
Deliverable:  Ensure accessible data to improve public reporting and transparency, streamline effort involved in request for information
processes, and leverage business development opportunities. 
Improved customer
experience
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Develop a model that opens up access to the council's non-personal / non-
commercial data in a way that allows anyone to freely access and use the data to
inform decision making with the resulting portal enabling greater transparency and
efficiency, and improved used of data.          
See Note 6.
Implement a Centre of Excellence which will standardise procedures, implement
clear governance structures, develop and share best practice, demonstrate value
through economies of scale and develop skills and knowledge among partners and
staff.          
Finance and
Resources Committee
Cycle 4 of
2022 (Policy
and Strategy
Committee)
Cycle 1 of
2025
Deliverable:  Ensure useful, secure, compliant, and digital first applications are available to support critical but streamlined service delivery.  Digital first operations
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Implement a new housing and asset management system to improve data
management, monitoring, and service delivery across housing.          
Housing Committee No previous
report
Cycle 3 of
2024
Implement a new case management and scheduling systems to meet statutory
obligations and to improve service delivery and performance management across
social care.          
Health and Social Care
Integration Joint Board
Cycle 2 of
2023
Cycle 4 of
2024
Review tools and products currently deployed to support the council’s financial
management arrangements, identifying and assessing options for longer-term
suitability, as well as opportunities to deploy efficient and effective automation and
self-service.          
Finance and
Resources Committee
No previous
report
Cycle 2 of
2025
Page 142 of 326

Page 143

Implement a leisure and facilities booking systems, including integration with hub
place bookings and introduction of compliant and secure payment facilities that
accommodate home and agile working arrangements.          
Communities
Committee - bookings /
Policy and Strategy
Committee - online
payments
Cycle 3 of
2023
(Finance and
Resources
Committee)
Cycle 1 of
2024
Review asset management practices across the organisation, including
categorising and consolidating system usage.          
Finance and
Resources Committee
No previous
report
Cycle 2 of
2024
Develop a portfolio of existing case management systems across the council and
use the results to establish a process and timeline for assessing existing solutions
and new requests. 
See Note 6.
Review current telephony systems and implement a new cloud-based Microsoft
Teams integrated solution, incorporating virtual voice and digital assistant
functionality.          
Finance and
Resources Committee
No previous
report
Cycle 1 of
2024
Develop and implement a strategy for the use of automation and generation
artificial intelligence (AI) across the council to define the architectural model of AI
use for the council and establish a framework and governance for usage.          
Policy and Strategy
Committee
No previous
report
Cycle 3 of
2024
Create a catalogue of standardised online technology catalogues to enable council
service areas to determine digital solutions matching their requirements and
enable self-service, where appropriate.          
See Note 6.
Create and integrate a framework that enables the use of spatial mapping
solutions (i.e. digital representation of the environment) across the application
estate.          
See Note 6.
Deliverable:  Facilitate fibre-enabled innovation to maximise the full potential of Internet of Things (IoT) and Artificial Intelligence (AI)
technologies in service delivery.  Digital first operations
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Implement the procured Wide Area Network solution and associated technical
functionality, such as internet breakout services and continued development and
deployment of fibre across North Lanarkshire. 
Finance and
Resources Committee
Cycle 4 of
2022 (Policy
and Strategy
Committee)
Cycle 1 of
2024
Deliver and manage a council-wide public Wi-Fi service.          
Communities
Committee
Cycle 4 of
2022 (Policy
and Strategy
Committee)
Cycle 1 of
2024
Identify opportunities to use the Internet of Things technology and establish a
framework for use, including an adequate governance model.          
Finance and
Resources Committee
No previous
report
Cycle 4 of
2024
Develop and implement a plan to enable internet access for temporary
accommodation properties.          
Housing Committee No previous
report
Cycle 3 of
2024
Page 143 of 326

Page 144

Develop a strategy to provide internet access to residents across North
Lanarkshire.          
Communities
Committee
No previous
report
Cycle 4 of
2024
Deliver the Smart Park pilot scheme (using omniled solutions), in order to gather
data within the park setting and prepare a business case on whether there are
adequate benefits to deploy further.          
Enterprise and Fair
Work Committee
Cycle 1 of
2022
(Transformati
on and
Digitisation
Committee)
Cycle 4 of
2024
Develop and deliver community access to the immersive pods (sensory spaces
which can be utilised to house the latest sensory technology to provide support, in
such areas as mental health and employability) across North Lanarkshire.          
Communities
Committee
Cycle 3 of
2023
(Finance and
Resources
Committee)
Cycle 3 of
2024
Create a digital infrastructure development toolkit and associated processes which
enables third party commercial connectivity providers to deliver services across
the council. 
Planning Committee No previous
report
Cycle 3 of
2024
Deliverable:  Ensure single source of data to provide insights and evidence that support decision making and service planning. Digital first operations
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Create a master data catalogue of all data assets across the council, defining the
prime record for each data set/field and supporting data owners to assess quality
and data mapping.          
See Note 6.
Develop and implement a method for services to transition from using paper-based
storage to a digital solution for retaining appropriate council information.          
Finance and
Resources Committee
No previous
report
Cycle 3 of
2024
Deliverable:  Develop an efficient digital and IT cost model to ensure scarce financial resources are aligned to vital enabling technologies.  Performance optimisation
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Identify digital and IT spend across the council and develop a model to establish
whether this is essential and priority spend.          
Finance and
Resources Committee
No previous
report in this
context
Cycle 2 of
2025
Develop and deploy structures and processes that aid the identification and
development of operational innovation and that facilitates beneficial service
transformation.          
No previous
report in this
context
Cycle 4 of
2024
Deliverable:  Enhance security monitoring to maintain effective access and control over council data as the council delivers the anticipated
increase in its digital footprint.  Performance optimisation
Actions Indicative timescales for delivery Indicative reporting schedule
Page 144 of 326

Page 145

2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Consider areas in relation to security within the council that can be monitored in
terms of service delivery and develop a framework for how performance against
these elements could be used to benchmark against the council’s peers.          
Finance and
Resources Committee
No previous
report in this
context
Cycle 1 of
2025
Review data assets and solutions delivered by or in conjunction with third party
providers and develop a plan to ensure that suppliers are consistently assessed
and reported upon to enable operational performance to be effectively managed
throughout the duration of any engagement.          
No previous
report 
Cycle 1 of
2025
Consider the range of cyber security controls, which may be used to manage and
secure council data and systems, assess the risk associated with data loss, and
create an assessment model to provide meaningful, insightful, and simple
representation of the cyber rating of data control.          
No previous
report 
Cycle 2 of
2025 
Programme of Work: One Service
Senior Responsible Officer (SRO): Stephen Penman (Depute SRO: Katrina Hassell) 
Deliverable:  Deliver the continued roll out of the Leadership and Operating Model to ensure an effective community leadership approach,
working with partners, as the hub approach develops.
Leadership and 
operating model and 
asset rationalisation
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Deliver phase 2 works for Broadwood Hub in Cumbernauld.           Policy and Strategy
Committee
Cycle 1 of
2023
Cycle 2 of
2024 Deliver Kildonan Street redevelopment by exiting Social Work by May 2023.          
Deliver Calderhead Hub phase 2 operational with options for out of hours access
taken forward.          
Deliver Caldervale Hub in Airdrie.          
Continue to expand the number of integrated hubs across the existing estate
2024-29 as part of transition to the operating model and to support asset
rationalisation.          
Develop and implement a transition plan for Cumbernauld Hub.            See Note 6. 
Gather a baseline understanding of future service delivery arrangements /
requirements as part of phase 2 for the 3-5 year transition to future operating
model and to inform the intelligence needed for investment in the current estate as
part of capital programme.          
Cycle 1 of
2023
Cycle 2 of
2024
Implement and work to an agreed process to govern and prioritise an organisation
review, service redesign, and workforce transition for the future operating model,
including completion of service reviews and consolidation into asset portfolio.           Page 145 of 326

Page 146

Work in partnership with Health and Social Care Partnership around GIRFE
(Getting it Right for Everyone) to strengthen early access to supports and services
through new ways of working within a community hub model.          
Develop and implement a proof-of-concept model for early and inclusive family
support enabled through the community hub model with a no wrong door approach
established across up to 14 community hubs by 2026 (18 by 2028). 
Operationalise a model for new community hubs to support the transition to future
operating model.  (February 2023 to February 2033)          
Deliverable:  Align the asset rationalisation strategy with the Leadership and Operating model to ensure coherent phasing and maximise
efficiency.
Leadership and 
operating model and 
asset rationalisation
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Support the redesign of home support services to enable locality integrated teams
by December 2024 and a phased approach starting with Bellshill and Motherwell.          
Policy and Strategy
Committee
Cycle 1 of
2023
Cycle 2 of
2024
Create a One Service operating model within the remaining estate.           Policy and Strategy
Committee
Cycle 1 of
2023
Cycle 2 of
2024
Identify technology priorities using the digital framework developed by the
operating model team and in line with phased approach for the operating model.           
Policy and Strategy
Committee
Cycle 1 of
2023
Cycle 2 of
2024
Implement a corporate telephony solution to support the introduction of a single
contact number and secure payment portal for the council.          
Policy and Strategy
Committee
No previous
report
Cycle 4 of
2024
Review the community asset profile across the nine Community Board areas to
identify best practice and next steps in order to improve the council’s approach to
community ownership and management of assets.          
Policy and Strategy
Committee
No previous
report
Cycle 4 of
2024
Widen the scope of the current Community Asset Transfer policy to include all
requests from communities to use, manage, lease, or take ownership of council
owned assets. 
Create a mechanism for agreeing discounted lease and let arrangements for
community based organisations where assessment shows clear contribution to the
council's ambitions and priorities. 
Create a refreshed communication plan and identity in relation to corporate
community ownership and management of assets to raise awareness of
opportunities and ensure a shared understanding of mechanisms and legislation. 
Review internal processes to identify improvements geared towards shifting the
culture of community ownership and management of assets to one of codesign
and with communities. 
Identify the council's approach to customer facing communications around
marketing of assets more coherently (all services) linked to corporate booking
system.           Page 146 of 326

Page 147

Deliverable:  Further develop workforce plans to ensure appropriate succession planning and alignment to the overall Programme of Work.                                                                                                                                            Workforce
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Support the delivery of all ongoing workforce and structure changes arising from
agreed operating model revisions and future savings, along with ongoing service
realignments linked to the future operating model and One Service programme of
work, and in partnership with services and Trade Union colleagues.                                               
Policy and Strategy
Committee
Cycle 4 of
2023
Cycle 4 of
2024
Continue with organisation and workforce mapping process to identify transition
plans (including where and how staff currently work to deliver services and to
determine how this will change with the move to a hub-based community delivery
model) for future workforce models and structures as these proceed and evolve
over the next 3-5 years.          
Progress actions from 2023/24 service Workforce Plans during 2024/25, with a full
refresh of Plans in 2025/26 in order to manage known workforce challenges and
risks.          
Deliverable:  Work with other Boards to support delivery of priorities across the Programme of Work. Working with other Boards
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Maintain strategic oversight of the dependencies and interdependencies across
the Programme of Work to reduce the risk of delayed projects, friction projects,
and duplication of effort.          
Policy and Strategy
Committee
No previous
report
Cycle 4 of
2024
Explore hot spots impacting on the effective delivery of the Programme of Work
and through an integrated diagnosis, one council approach, explore solutions for
discussion with other boards.          
Ensure that resources are in the correct place to deliver and make
recommendations regarding cross cutting changes enabling more efficient
services.          
Deliverable:  Ensure practical implementation of Change Management Framework. Working with other Boards
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Maintain strategic oversight of the council's significant change initiatives to ensure
successful delivery and implementation in line with the Change Management
toolkit.          
Policy and Strategy
Committee
No previous
report
Cycle 4 of
2024
Maintain oversight of the identification and successful realisation of benefits from
such change initiatives.          
Page 147 of 326

Page 148

Maintain oversight of the change management requirements resulting from public
sector reform or identified shared services.          
Develop new ways of engagement both internally and externally to support the
changes and upskilling required.           
Deliverable:  Lead engagement with staff, trade unions, and partners about the Programme of Work to ensure understanding and alignment. Working with other Boards
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Develop and implement an approach to ensure ongoing communication and
engagement with staff, trade unions, and partners for the Programme of Work as it
is delivered to 2028.          
Policy and Strategy
Committee
No previous
report
Cycle 4 of
2024
Deliverable:  Explore opportunities for shared services both within the council and with partners, where appropriate, to maximise efficiency. Shared services and 
public service reform
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Participate in Improvement Service programme of collaboration within the local
government sector on procurement.
Timescales for these areas of
activity are determined by the
Improvement Service
Policy and Strategy
Committee
No previous
report
Cycle 4 of
2024
Participate in Improvement Service analysis of local government's statutory and
discretionary services.
Participate in Improvement Service development of a Digital To-Be state for
Scottish local government. 
Participate in Improvement Service work in the identification of new digital shared
services that could be delivered nationally or regionally.
Participate in Improvement Service work to develop examples of active
communities / participatory design.
Deliverable:  Maintain oversight of public service reform developments and ensure co-ordinated response to external decision making which
has a bearing on council service delivery.
Shared services and 
public service reform
Actions
Indicative timescales for delivery Indicative reporting schedule
2023/
24
2024/
25
2025/
26
2026/
27
2027/
28 Committee Most recent
report  Next report
Contribute to the full implementation of Crerar for local government project. Timescales for this area of activity
are determined by the
Improvement Service
Policy and Strategy
Committee
No previous
report
Cycle 4 of
2024
Contribute to the development of Democracy Matters 2 consultation as part of the
Local Governance Review.           
Page 148 of 326

Page 149

Please note: 
1.  All timescales for delivery noted in this appendix are indicative and quarterly monitoring of the live Delivery Plan by each Programme of Work Strategic Board will ensure
that these timescales are kept under review and remain up to date based on the information available as at each review point.  A change request process has been
instigated to ensure as efficient and meaningful an approach as possible is in place to monitor delivery timescales moving forward. 
2.  There are many aspects that can impact on the actions to be delivered and the indicative timescales for delivery, e.g. available budgets, whether funding is granted (and
when), timescales covering funding allocations, resources, as well as the outcome of feasibility studies, procurements, and contracts to be awarded, etc.  In addition, some
actions involve work with external bodies, so timescales are not wholly within the control of the council. 
3.  As the Programme of Work approved at Policy and Strategy Committee in March 2023 was for a five-year period, i.e. 2023 to 2028, the Delivery Plan covers this timescale
also.  This means that many of the 2023/24 actions have already been undertaken and are complete (with significant achievements in this respect included in the
Programme of Work achievements to date report); these items are therefore only included in this Delivery Plan appendix for completeness and/or because they set the
scene for subsequent actions. 
4.  All dates in the next report column in the reporting schedule are indicative as at early February 2024.  While these dates reflect current reporting intentions this information
is subject to change as each area of work is progressed, developed, and delivered and a decision will be made on whether the reporting Cycle remains practicable as at
each quarterly review point.  It should be noted that while in many instances each separate action has a reporting Cycle against it, it may be that when it comes to writing a
report that it is more meaningful and sensible to provide an update on all of the actions collectively in the one report.  This will be determined for each action in advance of
each reporting Cycle.  It could also be the case that particular actions don’t merit an individual report on their own, or even with their accompanying actions and in these
instances a composite Programme of Work may make for a more meaningful report.  The change request and monitoring process will ensure as efficient and meaningful
an approach as possible to reporting in this respect. 
5.  Where no previous report is shown in the reporting schedule against an action this simply means that in many cases it is a new piece of work or there has been no
previous reports to committee within the context of the new piece of work, or the action may be operational in nature and no formal reporting has been previously required. 
6. It is not always appropriate for the next report column to contain a future reporting cycle, reporting for some actions may still have to be determined due to the reliance on
various other dependencies across the Programme of Work, or may still have to be established once another area of work has been completed.  For some actions it may
not be required or applicable for a further report as reporting may be incorporated into the next steps of a wider area of work or an action may already be concluded. 
7.  Where a reporting Cycle and date is shown for the most recent report column and this is accompanied by the name of a committee, this is only where the previous
committee which received the report differs to the committee which the next report will be submitted to. 
8. Where indicative delivery dates extend beyond the end of 2027/28, this information is noted within the action column. 
Page 149 of 326

Page 150

Page 150 of 326

Page 151

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    JMcK/MMcB Date 14/03/24 
Transforming Places – St Kevins Community Hub Contract Award 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail McBrideMark@northlan.gov.uk Telephone
Mark McBride, Property
Manager (Estate
Development) 
07583 094 928 
Executive Summary 
The purpose of this report is to advise Committee of the status of the contract pricing and
commercial activities for St Kevins Community Hub and to seek approval to progress to
Contract Award for the project. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Approve that the Property Manager (Estate Development) will conclude the contract
activities to finalise the commercial costs necessary for contract award as described
in Section 2 of this report for St Kevins Community Hub. 
(2) Acknowledge the Design and Build Development Agreements with Hub South West
for the design and construction of St Kevins Community Hub as referred to in
Section 2 of this report, on terms to be agreed by Chief Officer (Legal and
Democratic) and subject to terms representing Best Value. 
(3) Approve the contract award in accordance with the contents of this report. 
(4) Acknowledge that regular Town and Community Hub programme updates are
presented to the Education, Children and Families Committee. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement
(10) Engage with children, young people, parents, carers, and
families to help all children and young people reach their full
potential
Programme of Work Transforming Places
Item 8
Page 151 of 326

Page 152

1. Background 
1.1 St Kevin’s Primary School requires a new build primary school due to significant levels
of house building in the Bargeddie area. The existing primary school is currently
operating above capacity and this has impacted on both the occupancy and suitability
of the existing school and the school roll will continue to increase through further house
building, as per the updated local development plan. 
1.2 In 2019, the councils Policy and Strategy Committee approved the use of the existing
Hub South West Scotland partnership agreement as the ‘preferred’ procurement route
for the then Schools and Centres Investment Programme (now referred to as the Town
& Community Hub Delivery Programme) where those projects comply with the
qualifying criteria set out in the Territory Partnering Agreement and subject to a check
against the prevailing regulations to ensure compliance. 
1.3 The Hubco model is seen as a strategic long-term approach to the procurement of
public sector based infrastructure projects across Scotland. By delivering value for
money projects through Hub South West, the development timescales would be met
while value for money could be ensured through a tested procurement route by early
involvement of a Tier 1 contractor. As signatories to the Territory Partnering Agreement,
the council contract with Hub South West and Hub South West contract directly with
the successful tenderer. 
1.4 The procurement strategy approved in 2019 was an interim procurement strategy and
was subsequently reviewed in 2022 following a recommendation from audit. Policy and
Strategy Committee in 2022, approved a further procurement strategy which
recommended a Contract Strategy was prepared for the projects which had not yet
been committed to Hub South West. St Kevin’s Community Hub was already committed
to Hub South West at that time. 
1.5 A New Project Request was issued by the council to Hub South West in February 2022
to design and deliver the St Kevins Community Hub. Following a competitive tender
process, the project was awarded to a team consisting of Kier (Tier 1 Contractor) and
Stallan Brand (lead designer). 
1.6 St Kevins Community Hub will deliver new learning and teaching facilities for the young
people and wider community in the Bargeddie area of Coatbridge. The facilities are
designed by use by the primary school age pupils during the day. The Community Hub
will create a new St Kevins Primary School and include a Multi-Use Games Area. The
facility will also provide staff touchdown zones which will be accessible to council staff
and public sector partners who will be able to use this space when working within this
locality. 
2. Report 
2.1 A planning application for the development has been submitted with a decision
anticipated in April 2024. The construction contract will not be entered into unless
planning consent is granted. 
2.2 The Hub Delivery Team are currently reviewing Stage 2 information from Hub South
West. This includes design information, market testing analysis and construction
programme. The design and technical information is currently being checked for
compliance and ongoing clarifications will be concluded by the end of March 2024.
There are not anticipated to be any significant derogations or departures from the
Authority’s Construction Requirements.
Page 152 of 326

Page 153

2.3 The tendered work packages were subject to competition. Only minor commercial
queries remain as part of the overall Hub South West financial close process. A final
contract price will be concluded by the end of March 2024. 
2.4 The project is due to start on site in May 2024. 
2.5 The current indicative construction contract value, subject to finalisation, is £17.3m. 
2.6 The St Kevins Community Hub project has a bespoke suite of community benefits
proportionate to the scale of the project written into the Design & Build Development
Agreement (DBDA) contract, placing a duty on Hub South West and their Tier 1
contractor Kier to deliver on their community benefit commitments. Regular Town &
Community Hub community benefits progress updates are provided to the Education,
Children and Families Committee 
3. Measures of success 
3.1  Delivery of projects in line with the guiding principles linked to this programme of work,
which in turn are designed to deliver against the strategic priorities within the Plan for
North Lanarkshire. 
4. Supporting documentation   
Nil 
James McKinstry 
Chief Officer (Asset and Procurement) 
Page 153 of 326

Page 154

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Budget available within the Town and Community Hub Programme’s capital
budget. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Legal and Democratic have been involved in the contractual negotiations to reach
Financial Close with Hub South West. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒   
Page 154 of 326

Page 155

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Yes, existing technologies will be installed within the facility and there may be a
requirement at a later date for the incorporation of any new technologies. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Yes, the council’s net zero ambitions have been considered when developing this
project. The Authority’s Construction requirements place ambitious energy
performance targets on the design team e.g. the community hub is powered by an
all electric heating system and generates >10% of its anticipated energy use on site
through the use of photovoltaic cells. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Details of residual project risks are recorded on project specific risk registers. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒
Page 155 of 326

Page 156

If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 156 of 326

Page 157

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    UKSPF/SD Date 14/03/24 
UK Shared Prosperity Fund – Annual Update 
From  Pamela Humpries, Chief Officer (Place)  
E-mail Weiry@northlan.gov.uk Telephone Yvonne Weir
07508 001238 
Executive Summary 
The UK Shared Prosperity Fund (UKSPF) is a central pillar of the UK Government’s
Levelling Up agenda. It will provide £2.6bn of new capital and revenue funding across the
UK for local investment up to 31 March 2025.  The North Lanarkshire allocation of UKSPF
is £13,871,047, providing a mix of capital and revenue funding for projects across the
UKSPF’s three investment priorities: communities and place; support for local businesses
and people and skills, and an additional allocation for Multiply. Due to delays on the UKSPF
programmes being approved by the UK Government, lead authorities were given the
opportunity to reprofile expenditure across the 3-year programme and also between the
Multiply and People and Skills investment themes. The changes made to the North
Lanarkshire investment plan are outlined in section 2 of this report. 
A UKSPF Project Board, chaired by the Chief Officer (Place) was established in February
2023 to oversee the UKSPF programme implementation and to ensure that the appropriate
governance and reporting requirements are met.  An Assurance Framework has been
developed by the Board, in conjunction with internal audit, to provide guidance for project
officers in delivering activities in line with UK Government expectations and to ensure
appropriate compliance and verification is in place to monitor and report on the programme
to the UK Government as required. 
The North Lanarkshire UKSPF Programme covers 21 interventions, with a total of 29
individual projects to be delivered over the duration of the programme through to March
2025.  At the end of December 2023, it was reported that projects were live across 16
interventions with a further 4 interventions due to come on stream prior to the end of the
current financial year. The final intervention is scheduled to start in year 3 of the
programme.   
In line with UK Government requirements, the Council has submitted quarterly reports
confirming the level of expenditure and the outputs and outcomes recorded and verified in
the previous quarter. The latest report, covering up to 31 December 2023, was submitted
to Glasgow City Region on 12 January 2024 and reported a cumulative spend for the
UKSPF Programme of £2,348,627. Despite the delays in the start of the UKSPF
programme, the council is therefore on track to spend over 80% of the 2-year allocation up
to end of March 2024 and to reach full spend by the end of the UKSPF programme in
March 2025. 
Item 9
Page 157 of 326

Page 158

1. Background 
1.1 The UK Shared Prosperity Fund (UKSPF) is a central pillar of the UK Government’s
Levelling Up agenda. It provides £2.6bn of new capital and revenue funding across the
UK for local investment up to 31 March 2025. The funding was split over three financial
years as follows: £400m for 2022-23, £700m for 2023-24 and ramping up to £1.5bn for
2024-25. All areas of the UK received a conditional allocation of funding based on a
funding formula rather than direct competition for the funds. A total of £212m was
allocated to Scotland (8.4% of the UK total). 
1.2 The UKSPF seeks to support the UK Government’s wider commitment to level up all
parts of the UK by delivering on each of the levelling up objectives: 
• Boost productivity, pay, jobs and living standards by growing the private sector,
especially in those places where they are lagging
• Spread opportunities and improve public services, especially in those places where
they are weakest
• Restore a sense of community, local pride and belonging, especially in those places
where they have been lost
• Empower local leaders and communities, especially in those places lacking local
agency 
1.3 This report provides an annual update in relation to the North Lanarkshire Investment
Plan for the UKSPF which was approved by Enterprise, Growth and Fair Work
Committee in August 2022.  As reported previously North Lanarkshire’s investment
priorities, interventions, outputs and outcomes were submitted as part of the Glasgow
City Region (GCR) UKSPF Investment Plan on 1st September 2022 and were
subsequently approved by the UK Government on 5th December 2022. The North
Lanarkshire allocation of UKSPF is £13,871,047, providing a mix of capital and revenue
An integral part of the North Lanarkshire UKPSF investment plan is to deliver a number of
challenge funds where community groups and/or local businesses can apply to deliver
activities under the appropriate interventions. The Board and the relevant service
committees have approved 5 challenge funds specifications to date with 4 already open to
applications and the fifth due to come on stream for delivery on 2024/5. 
The progress of the UKSPF Investment Plan will be gauged against targets across a range
of outputs and outcomes which are reported as part of each 6-month report to the UK
Government. Progress over this period is summarised in section 3 of the report. 
Recommendations
It is recommended that the Committee:
(1) Acknowledges the progress that has been made with delivery of the Shared
Prosperity Delivery Plan over the course of 2023/24 and that a cumulative spend
for the UKSPF Programme of £2,348,627 has been reported as at end December
2023. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work All Programmes of Work
Page 158 of 326

Page 159

funding for projects across the UKSPF’s three investment priorities: communities and
place; support for local businesses and people and skills, and an additional allocation
for Multiply. 
1.4 The update report presented to this Committee in March 2023, noted that an exercise
was underway to reprofile the UKSPF allocation from 2022/23 into 2023/24 due to the
delay in the plan being formally approved by the UK Government. This exercise was
completed with all underspend being approved for carry forward. 
1.5 Following approval of governance and delegation arrangements at this committee in
March 2023, a UKSPF Project Board, chaired by the Chief Officer (Place) was
established in February 2023 to oversee the UKSPF programme implementation and
to ensure that the appropriate governance and reporting requirements are met. The
Board has delegated authority to approve quarterly reports and changes to UKSPF
projects/interventions and to oversee the development and implementation of UKSPF
challenge funds. 
2. Report 
2.1 The original UKPSF budget approved by Committee distributed the 3-year funding
programme across the investment themes and Multiply as set out below. 
Investment Priority
UKSPF
2022/23
UKSPF
2023/24
UKSPF
2024/25
TOTAL
UKSPF
Communities & Place £506,427 £350,000 £2,265,000 £3,121,427
Supporting Local Business £91,541 £746,083 £1,667,738 £2,505,362
People and Skills £739,000 £1,577,854 £3,072,976 £5,389,830
Multiply £695,223 £802,181 £802,181 £2,299,585
NLC Management/Admin
4%  £84,675 £144,838 £325,329 £554,842
TOTAL  £2,116,866 £3,620,956 £8,133,224 £13,871,046 
2.2 Due to the delayed start in delivery of the UKSPF Programmes across the UK, lead
authorities were given the opportunity to reprofile the budget for 2022/23 and carry
forward underspend into 2023/24. The Council reported spend of £251,197.68 up to 31
March 2023, with 4 projects delivering activity during that period. The balance of
UKSPF was carried forward into 2023/24, giving a budget of £5,486,624 for year 2 of
the programme. 
2.3 A further change in the distribution of funds took place during 2023/24 with regard to
the Multiply theme. As can be seen from the table above the original allocation to
Multiply differed from the other investment themes in its more even distribution across
the 3 years of the UKSPF programme. Given the delay in starting Multiply activities
during year 1 and that the majority of spend relates to staffing costs, the UK
Government recognised that increasing the spend in year 2 to take account of carry
forward was unrealistic. The opportunity was therefore afforded to lead authorities to
move projected Multiply underspend to support either planned or new activities under
the People and Skills investment theme. The council took advantage of this opportunity
Page 159 of 326

Page 160

to maximise the overall UKSPF spend and reallocated £526,616 from Multiply into the
People and Skills investment theme. The UKSPF Board considered proposals to utilise
the underspend and approved allocations to four projects, including additional
communications and marketing of Multiply activities at a regional level to generate
wider interest and engagement in the programme. 
2.4 Additionally, the Glasgow City Region (GCR) Cabinet agreed that a regional proposal
to support the Clyde Climate Forest be funded through the UKSPF Programme. The
Clyde Climate Forest is a 10-year programme, launched in June 2021, with initial
funding from the Woodland Trust and Scottish Forestry. UKSPF funding to the initiative
contributes to the core team and will allow it to continue to develop woodland habitat
and tree planting across the region as well as lever in additional funds for project
activities. A UKSPF allocation, pro rata based on population, has been made from all
8 GCR member authorities. 
2.5 As a result of the changes outlined above the revised distribution of UKSPF across the
investment themes and the 3-year programme is set out below: 
Investment Priority
UKSPF
2022/23
UKSPF
2023/24
UKSPF
2024/25
TOTAL
UKSPF
Communities & Place £42,500 £795,427 £2,246,500 £3,084,427
Supporting Local Business £0 £837,624 £1,667,738 £2,505,362
People and Skills £136,000 £2,661,474 £3,072,976 £5,870,450
Multiply £47,027 £923,766 £802,181 £1,772,974
NLC Management/Admin
4%  £25,671 £203,841 £325,329 £554,841
GCR led regional projects £0 £64,492 £18,500 £82,992
TOTAL  £251,198 £5,486,624 £8,133,224 £13,871,046 
2.6  Appendix 1 of this report provides an updated breakdown of the interventions and
activities being delivered under each of the above investment priorities. 
2.7 The planned investment of £13.86m outlined in Appendix 1, includes a number of
capital investment projects totalling an estimated £2.1m including: 
• contributions made to the works already completed at Bellshill Gateway and
Ravenscraig Active Travel Link from Craigneuk to New College Lanarkshire 
• investment in additional equipment to extend the support for local businesses
available through Smart Hub Lanarkshire
• investment in digital infrastructure to improve connectivity in community facilities
across North Lanarkshire
• provision of vocational training spaces for those with additional support needs
who are vulnerable to leaving school to a negative destination
• a contribution to the decarbonisation ambitions for the development of the
Watersports Centre at Strathclyde Country Park
• small scale capital investment to support improvements to cultural, heritage and
creative community facilities 
Page 160 of 326

Page 161

• improved active travel infrastructure connecting communities to key local facilities
and improving access to community facilities by active travel means. 
2.8 In November 2023, the UK Government confirmed their approach to underspend in
2023/24 and the ability to carry this forward into year 3 of the programme (2024/25).
This allows all underspend to be carried forward, with the caveat that the level of spend
reported at the end of 2023/4 will determine the amount of UKSPF funds that are paid
in advance at the beginning of the year. Funds not paid in advance will still be made
available to draw down at the end of the UKSPF programme so there is no impact on
the total funds available, just the timing of when it can be drawn down. 
2.9 The North Lanarkshire UKSPF Programme covers 21 interventions, with a total of 29
individual projects to be delivered over the duration of the programme through to March
2025.  At the end of December 2023, it was reported that projects were live across 16
interventions with a further 4 interventions due to come on stream prior to the end of
the current financial year. The final intervention is scheduled to start in year 3 of the
programme.   
2.10 Throughout 2023/24, the Board has overseen progress of individual projects and
ensured that delivery is on track. A number of projects have encountered recruitment
or procurement challenges leading to delays in activity starting, but all have put in place
mitigating actions to ensure that spend and progress towards outputs and outcomes
can still be achieved as planned. 
Financial Changes 
2.11 The UKSPF Board has delegated authority to approve financial changes both within
and between approved interventions, and where changes are less than 30% between
investment priorities
2.12 During 2023/24, the following financial changes were considered and approved by the
Board: 
UKSPF Source intervention Reallocated to
£37,500 S11: Feasibility Studies in
2023/24
S12: Digital infrastructure in
24/25
Glasgow City Region to support the
Clyde Climate Forest project over 2
years from April 2023 to March 2025
£460,701 S42: Courses designed to
increase confidence with
numbers
£45,992 reallocated to fund a Multiply
regional communications and
marketing programme. 
£159,394 reallocated to support
additional provision in interventions
S36 and S38: NLC Skills Academies 
£255,315 reallocated to support pilot
in-school pathways provision as part
of intervention S39: vulnerable young
people leaving school
£65,915 S49: Courses designed to
help people use numeracy to
manage money
Reallocated to new activity through a
Young Adult Offer as part of
intervention S35: Employability
Support
Page 161 of 326

Page 162

£100,000 S15: SME Development
Grants
The overall allocation to this
intervention remains unchanged but
capital investment from UKSPF was
brought forward from 2024/25 into the
current financial year.
£120,000 S39: vulnerable young people
leaving school
The overall allocation to this
intervention remains unchanged, but
revenue expenditure of £60,000 was
reallocated to capital investment in
each of 2023/24 and 2024/25. 
Challenge Funds 
2.13 In the Council’s UKSPF Investment Plan, seven interventions were identified to be
delivered, at least in part, through a challenge fund route. During 2023/24, the Board
approved guidance for project lead officers developing challenge funds and
specifications for each of the individual funds. Detailed specifications were also
presented to and approved at the relevant Service committees prior to implementation.
2.14 Five of the original seven intended Challenge Funds were approved by the Board
during 2023/24. Of these, the Volunteer Support Fund closed to applications as part of
the first round on 21 December and will make its first awards in February 2024. The
Community Empowerment and Digital Connectivity Challenge Funds will also close for
first round applications and make initial awards in February and March. All three of
these funds will open for a second round in 2024/25. The Tourism Challenge Fund and
Employability Challenge Fund will support projects being delivered in 2024/25 and will
make awards in March/April 2024. A further intervention within the support for local
businesses investment theme was also identified as being appropriate for delivery as
a challenge fund. Through intervention S20, a challenge fund has been developed to
provide funding for businesses to help them achieve their net zero ambitions and will
be launched for delivery during 2024/25. 
2.15  The Board also considered the challenge fund approach for two further interventions:
S5: Support for sports, arts, cultural, heritage and creative activities and facilities and
S6: active travel enhancements. Both interventions have a capital allocation of UKSPF
and were identified as at risk should delays in implementing the challenge fund
approach or in the delivery of supported capital investment be encountered. The latter
was considered high risk given the limited timeframe of UKSPF closing in March 2025
and the need for external partners to design, procure and deliver projects of scale within
a challenge fund approach. To mitigate against projects being unable to apply for
challenge funding and complete within the UKSPF timescales, the Board agreed to
reallocate the funds under these interventions to relevant medium scale Council led
investments where the feasibility and design works were already underway. To ensure
that the target outcomes are achieved, projects will be required to demonstrate a high
level of community engagement in their design and community benefit in their
implementation. 
Reporting to GCR and UK Government 
2.16 The UK Government require formal reporting on a 6-monthly basis at the end of
September and the end of March each year. This includes detailed questions about
projects, outputs, outcomes and expenditure. The reports submitted to the UK
Government relate to the regional investment plan, with information from the 8 member
authorities submitted to the Glasgow City Region (GCR) Programme Monitoring Office
Page 162 of 326

Page 163

(PMO) and thereafter collated into a GCR report that is considered by the Finance
Strategy Group and approved by the GCR Cabinet prior to submission. 
2.17 The first 6 monthly report was submitted at the financial year end – reporting on all
activity up to the end of March 2023. The council reported spend of £251,197.68 up to
31 March 2023, with 4 projects delivering activity during that period. The subsequent
6-month report was submitted for the period up to end of September 2023. This
reported a Council cumulative spend of £1,199,336 for the UKSPF programme,
including management and administration costs. 
2.18 A quarterly report at the end of December 2023 was requested as part of the regional
governance arrangements. The Council reported cumulative spend of £2,348,627 to
December 2023. This represents over 40% of the allocation up to the end of March
2024 and with the majority of projects now in the delivery phase, it is projected that
spend of over 80% of the 2-year allocation up to end of March 2024 will be reached
allowing full draw down of year 3 UKSPF at the start of 2024/25. 
Evaluation 
2.19 Frontier Economics and BMG Research have been appointed by the UK Government
to lead an intervention level evaluation of UKSPF. Following an initial shortlisting of
potential projects across the UK, North Lanarkshire Council was invited to a meeting to
discuss the business grants project and the provision of further information on the
grants programme. The UKPSF business grants intervention (S15) has now been
selected for inclusion in the evaluation. The aim is for the evaluation to be a
collaborative experience where the evaluators will share and discuss the insights and
learning generated and any early indications of outcomes as the work progresses. The
evaluation will involve similar activities from two other UKSPF programmes and will
take place over the life of UKSPF with the final report due in Autumn 2025. 
3. Measures of success 
3.1 The UKSPF Investment Plan set out targets across a range of outputs and outcomes
and progress towards these is reported as part of each 6-month report. Although some
progress was reported at the end of September 2023, it is too early in the delivery of
projects to record significant progress against many of the output and outcome targets. 
The first major outputs/outcomes report is due to be submitted to the UK Government
in April 2024 covering the period up to the end of March 2024 and will therefore be
more fully reported in the next update report to committee. 
3.2 As noted previously, appendix 1 provides a list of interventions and activities being
delivered under each of the UKSPF investment priorities. The programme covers a
diverse range of projects from supporting volunteering, providing start up and
development grants to local businesses, skills training to enhance employment
opportunities and supporting individuals to better manage their money. Funds are also
allocated to capital projects and so far have contributed to the creation of Ravenscraig
active travel link, with further active travel investment planned for 2024/25. Under the
People and Skills investment theme, UKSPF has continued to support employability
projects funded previously by the European Social Fund but has also been able to
support additional targeted provision for those who are economically inactive – a target
group that has increased in North Lanarkshire over recent years. The development of
Built Environment and Digital Skills Academies have also been enhanced by
contributions from the UKSPF. 
Page 163 of 326

Page 164

3.3 The UKSPF Board has delegated authority to approve changes to outputs and
outcomes at intervention level. Changes were approved to 2 projects based on
experience gained between the development of targets as part of the investment plan
submission and finalising the delivery plan for individual projects. 
Output/Outcome Original Target Revised Target
Number of households receiving
support
1120 800
Number of households supported to
take up energy efficiency measures
1120 800
Number of economically inactive
people supported to engage with the
benefits system
325 100
Number of economically inactive
people engaged with the benefits
system following support
300 90 
4. Supporting documentation 
4.1 The UKSPF prospectus can be viewed at:  UK Shared Prosperity Fund: prospectus -
GOV.UK (www.gov.uk) 
4.2 A link to the GCR Investment Plan summary can be viewed at: UK Shared Prosperity
Fund Investment Plan (glasgowcityregion.co.uk) 
4.3 UK Shared Prosperity Fund – Update, Policy and Strategy Committee, 16th March
2023 - Document.ashx (cmis.uk.com) 
Pamela Humphries
Chef Officer (Place) 
Page 164 of 326

Page 165

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The overall aim of the UKPSF is to build pride in place and increase life chances.
The impact will therefore be positive across a number of equality groups with many
projects targeted as particularly vulnerable groups. A full EQIA has been
completed. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The UKSPF brings just under £14million investment into North Lanarkshire to be
distributed across the investment themes of communities and place, local support
for businesses, people and skills and multiply. An Assurance Framework has been
approved to provide guidance for project officers delivering UKPSF funded
activities to ensure appropriate compliance and verification is in place. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
A number of projects will require additional staff to be recruited on temporary
contracts. Each Service will/has discussed people resource requirements with the
relevant contacts and sought approvals as necessary. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Page 165 of 326

Page 166

A grant offer letter and pass down agreement for the UKSPF is in place between
Glasgow City Region (as lead authority for the investment plan) and North
Lanarkshire Council. This has been agreed by Legal and Democratic and approved
by the Section 95 Officer. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☒ No ☐  
A DPIA and Privacy notices are in place for UKSPF interventions where required. 
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
There is a requirement to acknowledge that activities supported through the
UKPSF are funded or part funded by the UK Government. Branding guidelines
have been made available to all project leads and Corporate Communications
Team are available to provide advice and guidance. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
Page 166 of 326

Page 167

Management of the UKPSF is following the Council’s project management
framework and a position risk assessment has been undertaken and a risk and
issues log developed to support management of the programme. This is reviewed
by the UKPSF Board at least 6 monthly. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
UKSPF will deliver an education and skills programme of activities targeted at
vulnerable young people preparing to leave school. This will build on the existing
provision in place to support those with additional support needs and through the
Pathways programme with a specific focus on vocational training and life skills. 
This will contribute to Article 29 – goals of education. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 167 of 326

Page 168

Appendix 1: North Lanarkshire Investment Plan Activities
Table 1: Communities and Place - £3,084,427
Intervention Summary of Proposed Activity Original
UKSPF
Allocation
Updated
UKSPF
Allocation
S2 Support for the 'net zero' redevelopment of the
Strathclyde Country Park Watersports centre.
£400,000 £400,000
S5 Funding to enhance a number of sports, arts,
cultural, heritage and creative projects/facilities
including support for the lighting at the cycle
facilities at Bellshill Gateway.
£642,500 £642,500
S6 Funding to support active travel projects across
North Lanarkshire, including the Ravenscraig
Active Travel link 
£550,000 £550,000
S7 Support to develop a Heritage Trail with the aim
increasing visitors and supporting employment
in the tourism sector. Some funding will also
support wider tourism marketing through Visit
Lanarkshire.
£120,000 £120,000
S8 Support for volunteering initiatives to help
expand volunteering opportunities across North
Lanarkshire, including a challenge fund to
support community groups to engage and
support new volunteers.
£220,000 £220,000
S9 Funding for participatory budgeting
programmes aimed at supporting community
empowerment, capacity building and delivery of
the 9 Local Outcome Improvement Plans.
£750,000 £750,000
S10 Support to enhance advice and assistance for
those facing fuel poverty
£150,000 £150,000
S11 Support for feasibility studies for active travel or
other activities that could be funded under the
Communities and Place interventions
£75,000  £56,500
S11 GCR – Clyde Climate Forest 0 £37,000
S12 Challenge fund to support community
organisations improve their digital connectivity
£213,927 £195,427
TOTAL  £3,121,427 £3,121,427 
Table 2: Supporting Local Business - £2,505,362
Intervention Summary of Proposed Activity Original
UKSPF
Allocation
Updated
UKSPF
Allocation
S14 Challenge Fund to support specific activities to
help tourism businesses grow and develop
their operations.
£150,000 £150,000
S15 Grant funding and support for businesses to
help increase start-ups, growth, investment and
employment opportunities, including support to
for advanced manufacturing technology
£1,300,000 £1,300,000
S19 Targeted support to help increase business
start-ups and encourage entrepreneurs from
£295,362 £295,362
Page 168 of 326

Page 169

the BAME community and to support Women in
Business
S20 Continuation of expert help framework to
support SME business growth and bespoke
support for businesses to transition to Net Zero
and/or create green jobs
£550,000 £550,000
S22 Funding to help support capacity building and
growth of social enterprises across North
Lanarkshire 
£210,000 £210,000
TOTAL  £2,505,362 £2,505,362 
Table 3: People and Skills - £5,389,830
Intervention Summary of Proposed Activity Original
UKSPF
Allocation
Updated
UKSPF
Allocation
S31  Employment support for economically inactive
people: Intensive and wrap-around one-to-one
support to move people closer towards
mainstream provision and employment,
supplemented by additional and/or specialist
life and basic skills (digital, English, maths* and
ESOL) support where there are local provision
gaps.
£718,830 £718,830
S35 Support for employability programmes and
advice, places should have regards for No One
Left Behind agenda, the Young Person’s
Guarantee, Fair Start Scotland and Scottish
employability pipeline. This could include
tailored support to help people in employment,
who are not supported by mainstream provision
to address barriers to accessing education and
training courses.
£2,721,000 £2,786,911
S36   Support for local areas to fund local skills
needs. This includes technical and vocational
qualifications and courses up to level 2 and
training for vocational licences relevant to local
area needs and high-value qualifications where
there is a need for additional skills capacity that
cannot be met through mainstream funding
£700,000 £793,129
S38 Funding to support local digital skills. £350,000 £416,265
S39 Support to expand support programmes to help
vulnerable young people achieve positive post-
school destinations, such as pathways
provision and vocational training for those with
additional support needs.
£900,000 £1,155,315
TOTAL  £5,389,830 £5,870,450 
Page 169 of 326

Page 170

Table 4: Multiply - £2,299,585
Intervention Summary of Proposed Activity Original
UKSPF
Allocation
Updated
UKSPF
Allocation
S42 Integrated maths in the community programme
– Sum It Up - to provide bespoke and tailored
numeracy learning
£1,920,327 £1,459,627
S49 Delivery of training to improve financial literacy
for people with debt problems
£379,258 £313,347
GCR Multiply Regional Marketing 0 45,992
Total  £2,299,585 £1,818,965 
Page 170 of 326

Page 171

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    AMcP Date 14/03/24 
Findings of Internal Audit of Council Approach to Climate Change 
From Andrew McPherson, Depute Chief Executive  
E-mail mcphersona@northlan.gov.uk Telephone 07939 280467 
Executive Summary
The purpose of this report is to provide Committee with the detail of the findings of the most
recent internal audit into climate change, remitted by the Audit and Scrutiny Panel, and
highlight the actions already under consideration to address the findings. 
Recommendations
It is recommended that Policy & Strategy Committee: 
(1) Duly consider and acknowledge the implications of the findings of the Internal Audit
Report.
(2) Approve the approach to not only address the audit findings, but to move the
Council and North Lanarkshire towards net zero. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Sustainable Futures
Item 10
Page 171 of 326

Page 172

1. Background
1.1 Tackling climate change, whether it is through reducing how much the Council
consumes, adapting to the current future impacts or acting more sustainably is a duty
that has been in place since 2009 and will continue long after 2045. 
1.2. Since the Internal Audit Report of the 24 June 2016 where the Council’s carbon
management and fulfilment of its duties in terms of the Climate Change (Scotland) Act
2009 was found to give ‘Limited Assurance’, a great deal of work has been successfully
progressed to realise a ‘Reasonable Assurance’ assessment in the recently completed
report. The Council’s 47.1% reduction in its footprint is testament to this. 
1.3 The purpose of the recent audit was to review the Council’s progress in reducing its
carbon footprint and to determine: 
• whether the Council has established clear plans linked to available resources to
deliver further reductions in carbon emissions in line with climate change
commitments the Council is expected to deliver against;
• whether plans contain clear milestones and targets against which performance can
be tracked and whether performance is routinely monitored and reported to key
stakeholders;
• whether governance arrangements surrounding climate change activities are
appropriate and operating effectively; and
• whether carbon impacts are routinely incorporated into the Council’s decision-
making processes. 
1.4 The ‘Internal Audit Progress Report’ brought before the Audit and Scrutiny Panel on 20
November 2023 included the findings of the report and found: 
‘..in relation to climate change, the Panel recommend the findings of the relevant
Internal Audit report be highlighted to Policy and Strategy Committee, as in the view
of the Panel, there needs to be awareness across the organisation that current
ambitions in relation to climate change are unlikely to be achieved in the timescales
which had been previously agreed by the Council and there needs to be greater
clarity as to how the Council will achieve any future targets agreed by the Council
and/or statutory targets set by the Scottish and UK Governments.
1.5 This report shares the findings of the aforementioned Internal Audit Report with
Committee so that they are informed of the challenge the Council faces in relation to
its ambitious timescale to achieve net-zero. The full report is contained at Appendix 1.
1.6 In June of 2019 a decision was taken by elected members to declare a Climate
Emergency and to commit to achieving net zero for North Lanarkshire by 2030. This
declaration not only included the Council moving to a net zero position within this
timeframe but for the North Lanarkshire area as a whole to be at net zero by 2030. 
1.7 This target must be set against the current prescribed Scottish Government targets to
achieve net zero by 2045 with interim targets of a 75% reduction by 2030 and 90% by
2040. 
1.8 The purpose of this report is to outline the Council’s revised approach towards net zero
and the associated strategies and legislative requirements which will contribute towards
achieving this goal. 
Page 172 of 326

Page 173

2. Report
2.1 The current Climate Action Plan (Act 2030) provides details of the Council’s current
emissions and sets specific targets for each financial year up to 2029/30. What is now
clearly apparent, is that there is no realistic possibility of the Council or the North
Lanarkshire area as a whole reaching net zero by 2030. What is required therefore, is
a complete review of the Council’s overall strategy and a detailed route map of the
actions required to achieve net zero. This route map must be realistic, have overall
targets/ milestones and be fully costed to allow a full understanding as to the cost in
delivering the ambition in line with the legislative requirements established by the
Scottish Government.   
2.2 Along with the Climate Action Plan, there are several other interrelated legal
requirements and strategies that will assist with the overall drive to net zero, including: 
• Local Heat and Energy Efficiency Strategy (LHEES) – delivering low cost and
low carbon heating solutions through local heat networks.
• Mission Zero for Transport – delivering an electric vehicle charging infrastructure
across North Lanarkshire which will allow the transition to low carbon transport.
• Energy Efficiency in Social Housing (EESH) - sets the minimum energy
efficiency standard that all our houses and flats must meet, in stages, up to 2032.
• Active Travel Strategy - getting people out of cars and providing a network which
will enable people to get about North Lanarkshire and beyond by active means
– and ties in with our new Town Vision to have everything more local and
connected.
• Biodiversity Action Plan - Nature regulates the climate, and nature-based
solutions, such as protecting and restoring wetlands and peatlands, or
sustainably managing woodlands and greenspaces, will be essential for
emission reduction and climate adaptation.
• Adaptation Strategy – will set out the actions that the Council will take to mitigate
against the current and future effects of climate change.
• Energy generation – there is a commitment within the new Sustainable Futures
Programme of Work to examine the possibility of how the Council can start to
generate its own energy as part of a long-term strategy to decarbonise our
energy supply but at the same time deliver cheaper energy costs to our own
residents. 
2.3 As can be seen from the above list, there are a considerable number of elements which
will contribute towards our net zero journey and demonstrates the complexity and scale
of ambition that must be delivered to achieve net zero. It should also be noted that the
cost associated with the delivery of many of the elements listed above are substantial.
It has been estimated that to deliver a fully zero emission council fleet will cost in the
region of £70M and to deliver fully on the ambitions associated with EESH by 2032 has
been estimated at around £430 million. It is critical therefore that new Clime Action Plan
fully reflects such costs. 
2.4 Due to the wide variety of different elements contributing towards net zero, a critical
success factor will be to ensure that all of these separate but interdependent projects
do not work in isolation but are fully aligned to deliver a truly strategic approach towards
net zero. 
2.5 To deliver on this approach, the Council will now create a small but dedicated Climate
Action team with the sole purpose of delivering a realistic pathway to net zero. This will
address genuine concerns around capacity within individual service areas and all costs
Page 173 of 326

Page 174

associated with this team will come from pulling existing resources across several
service areas. 
2.6 A critical outcome from this team will be to ensure that climate change is more
effectively embedded into the Council’s decision-making process. Given the challenge
presented by delivering net-zero, the Council needs to be consistently considering the
potential carbon impacts of all decisions more explicitly as part of its decision-making
processes. 
2.7 The governance of this approach will be monitored through the Sustainable Futures
Programme of Work Board and will be in line with the Public Sector Leadership on the
Global Climate Emergency (2021) with regular updates to the relevant service
committees and the Environment and Climate Change Committee receiving regular
updates on the overall strategic progress towards net zero. 
2.8 It is also incumbent upon the Council to act as a net zero champion, not only amongst
our public sector partners but also amongst our communities and business community.
By providing this leadership role, the intention will be to motivate, mentor and assist
North Lanarkshire, the place, towards net zero. 
3. Measures of success
3.1 To deliver a practical and realistic pathway for the Council to achieve net zero. 
4. Supporting documentation  
Appendix 1  Internal Audit Report (Climate Change) 
Andrew McPherson
Depute Chief Executive 
Page 174 of 326

Page 175

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Creation of the Climate Action Team will come from pulling existing resources from
a number of service areas and will predominantly be capital based. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
If approved, colleagues within HR will be involved within the formation of the
Climate Action Team. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Page 175 of 326

Page 176

Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The detail within this report and its appendix raises awareness on issues/barriers
that the Council must overcome in order to successfully deliver on its climate
change duties and its own climate ambition. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC).
Page 176 of 326

Page 177

If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 177 of 326

Page 178

Appendix 1 – Internal Audit Report (Climate Change)
Page 178 of 326

Page 179

9 
INTERNAL AUDIT REPORT 
Contents    
1.  Executive Summary 2.  Findings and Recommendations 3.  Action Plan
Appendix 1: Audit grading Appendix 2: Leaders’ Climate Emergency Checklist
Issued to: Depute Chief Executive and Chief Officer (Asset and Procurement)
Copied to: Climate Change Lead Officer and Chief Executive 
Headlines
The purpose of this audit was to review progress made by the Council in reducing carbon emissions and to
assess the adequacy and effectiveness of current management arrangements relating to climate change. This
audit has made use of a range of reports and guidance published on climate change as a benchmark against
which to assess the Council’s progress in this area including Audit Scotland’s report ‘Addressing Climate
Change in Scotland’ (March 2022) and the Leaders’ Climate Emergency Checklist, (see extract at appendix 2)
produced by the Sustainable Scotland Network.
The UK Climate Change Committee has stated that the 2020s will be critical across society and the economy
for the transition to greater sustainability and net zero, requiring a decisive shift from planning to action,
implementation, and rapid progress. The Scottish Government has set a legally binding target of Scotland
becoming net zero by 2045, five years earlier than the UK, with all public bodies having a responsibility to
contribute to the achievement of this target. The Council recognises that it must act and has declared a climate
emergency, previously committing itself and the area of North Lanarkshire to achieving net-zero by 2030.
The Council continues to reduce its’ emissions from the baseline year of 2015/16. A recent report to the
Environment and Climate Change committee in February 2023, highlighted 2021/22 emissions had been
reduced to 46.4% of 2015/16 levels. Further expected reductions to 52.2% are expected by 2025/26.
Significant actions will however still be required to deliver the required further reductions if the Council’s
commitment to net zero is to be realised and there is a recognition that many of the ‘quick wins’ have already
been taken.
In 2021, members approved an updated Climate Plan – Action on Climate Together 2030 (ACT 2030) which
forms part of a range of strategies, policies and plans grouped under a refreshed Environment Pathway
(previously the Environment Strategy) approved in 2023. The recently refreshed Programme of Work (PoW)
to support delivery of the ‘Plan for North Lanarkshire’ has led to the formation of a Sustainable Futures Thematic
Board (replacing the Climate Change Board) whose purpose is to provide strategic leadership and
management of all aspects of the Council’s climate change duties including a focus on the Council's
commitments to net-zero and the associated actions required to make this a reality.
Based on the results of our work, we have assessed this audit as offering ‘reasonable assurance’. We last
audited this issue in 2020, when we raised some issues and recommendations around the Council’s
governance arrangements for responding to climate change, including on target setting and performance
reporting. We are pleased to note that the Council can demonstrate ongoing satisfactory actions in response
to these previous recommendations. We are also satisfied that the Council’s ACT 2030 Climate Plan is aligned
with the Council’s Plan for North Lanarkshire and the Council has continued to progress actions to reduce
carbon emissions and to comply with its statutory responsibility to complete and submit an annual Climate
report. (continued overleaf) 
Internal Audit Opinion (see definition at Appendix 1) Reasonable assurance (Green-Amber) 
Organisational impact (see definition at Appendix 1) Moderate 
Report status FINAL Audit ref 0900/2023/010 Date issued 06/11/23
Audit Team Elaine MacDonald and Paula Hendry 
CLIMATE CHANGE
Page 179 of 326

Page 180

10 
Headlines (continued)
(Continued from overleaf)
Notwithstanding this progress to date however, it is clear that the commitment to net zero by 2030 was,
and remains, hugely ambitious and that delivering this appears to Internal Audit unachievable given a
number of relevant challenges facing the Council.
Most significantly these include the difficulty of identifying, planning, financing and progressing in such a
short timescale the range of actions likely to be required to achieve net zero by 2030. There remain
significant challenges around the cost and affordability of any such actions and their inclusion in relevant
financial revenue and capital plans at a time where the Council’s overall finances are under significant
pressure.
We have therefore raised a number of issues which we consider management require to address. These
are detailed at Section 3 of the report and include:
• The current Climate Plan (ACT 2030) needs to be supported by a detailed route map of planned
actions designed to achieve net zero/deliver the Council’s climate change commitments. This should
include realistic overall targets/milestones for the journey to net zero. The detailed route-map should
be regularly updated and include information on expected individual project/action timescales, costs
and other resource requirements.
• The recently revised governance arrangements for climate change need to be kept under review to
ensure they are effective in progressing the delivery of actions designed to achieve the Council’s
climate change commitments and allowing effective oversight of progress by senior management
and elected members.
• Climate change needs to be more effectively embedded into the Council’s decision-making
processes. Given the challenge presented by delivering net zero, the Council needs to be
consistently considering the potential carbon impacts of all decisions more explicitly as part of its
decision-making processes.
Page 180 of 326

Page 181

11 
1. Executive Summary 
Objectives
This was a short, focused review designed to review the progress made by the Council in reducing carbon
emissions and assessing the adequacy and effectiveness of current management arrangements. It also
reviewed how well management has addressed weakness or areas for improvement identified in previous audit
reports on this topic.
The audit considered:
• whether the Council has established clear plans linked to available resources to deliver further reductions
in carbon emissions in line with climate change commitments the Council is expected to deliver against;
• whether plans contain clear milestones and targets against which performance can be tracked and whether
performance is routinely monitored and reported to key stakeholders
• whether governance arrangements surrounding climate change activities are appropriate and operating
effectively; and
• whether carbon impacts are routinely incorporated into the Council’s decision-making processes.
This engagement has been conducted in accordance with the ‘Public Sector Internal Audit Standards’. The
Internal Audit section reports formally on conformance with these standards to the Audit and Scrutiny Panel. 
Number and category of recommendations raised
(see definition of priority at Appendix 1)
High Medium Low
1 2 1 
Key areas requiring management action (High)
The following key area requiring urgent management action has been identified:
• The current Climate Plan (ACT 2030) needs to be supported by a detailed route map of planned actions
designed to achieve net zero/deliver the Council’s climate change commitments. This should include
realistic overall targets/milestones for the journey to net zero. The detailed route-map should be regularly
updated and include information on expected individual project/action timescales, costs and other resource
requirements. 
Good practice identified
We noted the following areas of good practice during the audit:
• The Council's Climate Plan ‘Action on Climate Together 2030’ (ACT 2030) covers the period 2021 to 2030.
It sets out the Council’s recognition of the climate and biodiversity emergency and in response to this makes
a commitment to act;
• The Council’s Climate change agenda is managed under the remit of the recently established Sustainable
Futures PoW Board;
• Services have systems and processes in place for data collection and the collation of the data into carbon
emission information that is used in the annual Climate Report;
• The Council has produced and submitted its Annual Public Sector Climate Change Duties Report to the
Sustainable Scotland Network in a timely manner; and
• The Council is on track to produce its Local Heat and Energy Efficiency Strategy by the statutory deadline
of December 2023. 
Other areas for improvement (Medium)
A few other areas for improvement were also identified:
• The recently revised governance arrangements for climate change need to be kept under review to ensure
they are effective in progressing the delivery of actions designed to achieve the Council’s climate change
commitments and allowing effective oversight of progress by senior management and elected members.
• Climate change needs to be more effectively embedded into the Council’s decision-making processes.
Given the challenge presented by delivering net zero, the Council needs to be consistently considering the
potential carbon impacts of all decisions more explicitly as part of its decision-making processes.
2. Findings and Recommendations
Page 181 of 326

Page 182

3. Action Plan Climate Change 0900/2023/010 
Ref Finding
1 The current Climate Plan (ACT 2030) needs to be supported by a detailed route map of planned actions designed to achieve net zero/deliver the
Council’s climate change commitments. This should include realistic overall targets/milestones for the journey to net zero. The detailed route-map
should be regularly updated and include information on expected individual project/action timescales, costs and other resource requirements.
In response to the Scottish Government’s target to achieve net zero by 2045, the Council declared a climate emergency in June 2019, committing to achieving net-zero within North
Lanarkshire by 2030. As a result, the Council created a climate plan - Action on Climate Together 2030 (ACT 2030) which sets out the Council’s recognition of the climate and
biodiversity emergency. This plan highlights that against a baseline of 2015/16, the council’s footprint and performance as at 2020/21 has been reduced by approximately 48%
and sets a target to increase this to 52% by 2025/26. Given that there are only a further four years to 2030, during which time a further 48% reduction is required to reach net-
zero, we consider achievement of this commitment to be very ambitious in such a relatively short timescale particularly in the absence of identification of the detailed and resourced
plans necessary to deliver the commitment.
The plan concludes by setting out that the next phase is to produce and publish a detailed climate action plan and build a planned route map to 2030. A report was presented to
the Environment and Place Committee in August 2022, which provided an update on the Council’s journey to net-zero and contained a consolidated list of Services’ climate actions
currently underway to assist in tackling the climate challenges. The report acknowledges that the actions identified to date are not sufficient to achieve the climate target set for
2030 and an acceleration and upscaling of deliberate action is required to achieve net-zero greenhouse gas emissions. The report also highlights that the ability to define the
optimum course of action for North Lanarkshire to achieve net-zero emissions sits out with the normal skillset of the Council and proposes that external professional advice is
sought. Whilst the list of Services’ actions contained in the Committee report provides a good foundation, our review identified that these have not been translated into a
comprehensive action plan which provides actions in SMART terms with responsible officer, timescales, and mechanisms for tracking, monitoring and reporting on progress.
The Sustainable Scotland Network guidance on public sector leadership on this global emergency states that climate change must be integrated into financial planning and reporting,
including aligning investments and programmes with the priorities of the updated Climate Change Plan to support a just transition to net zero and a green recovery. There is a need
to ensure expenditure and financial plans are aligned with emission targets, resources from external sources are accessed, and opportunities to engage in cost effective
collaboration exercises are pursued. Presently, the Council’s understanding of cost pressures, direct impacts of climate change and planning for net zero are not mature enough
to enable them to be accurately quantified and reflected in the Council’s Medium-Term Financial Plan.
As part the revised programme of work and associated governance arrangements to support the Plan for North Lanarkshire, responsibility for climate change now falls under the
remit of the Sustainable Futures Programme of Work (PoW) Strategic Board. The delivery plan for the Sustainable Futures PoW theme includes the need to develop a route
map/action plan to provide an outline strategy as to how the Council will move to net zero (including outline costs, timeframe and review periods), with an indicative range of actions
with timeline across 2024/25 and 2025/26. We understand that appointment of a partner/consultant referenced above will also be taken forward.
Notwithstanding progress to date however, it is clear that the commitment to net zero by 2030 was, and remains, hugely ambitious but that delivering this presents, what to Internal
Audit appear insurmountable challenges for the Council. Most significantly these include the difficulty of identifying, planning and progressing in such a short timescale the range
of actions likely to be required to achieve net zero and challenges around the affordability of such actions and their inclusion in relevant financial plans at a time where the Council’s
overall finances are under significant pressure.
Implication Recommendation Priority
If the ACT 2030 does not clearly set
out an up-to-date route map and action
plan to net zero, the Council may fail to
effectively progress towards/achieve
its own net zero commitments and/or
be timeously alerted to any shortfall
that requires remedial action(s) and/or
communication to stakeholders.
The Depute Chief Executive (as SRO for the Sustainable Futures Thematic Board) should, as a matter of priority:
(1) create a formal detailed action plan/route map setting out in SMART terms planned actions designed to achieve net zero/deliver
the Council’s climate change commitments. This should be regularly updated and include information on responsible
officers/expected timescales, costs and other resource requirements and include a mechanism for tracking, monitoring and
reporting on progress against key milestones/targets to relevant key stakeholders; and
(2) as part of the preparation of a detailed route-map, review whether the current timescale for reaching net zero by 2030 remains
realistic/achievable, reporting the outcome of this review, along with any revised target dates/milestones, to relevant stakeholders. 
High
Page 182 of 326

Page 183

3. Action Plan (continued) Climate Change 0900/2023/010 
Management response Implementation
Month/Year
Agree
James McKinstry, Chief Officer (Asset and Procurement)
As the lead for Climate Change, many actions are currently being taken forward by Asset and Procurement in relation to climate change, including but not limited to
completion and submission of the Council’s annual public sector climate change duties report, completion of the current phase of the LHEES strategy and delivery
plan, participating in the Sustainable Futures Board and ongoing delivery of phase 3 of the non-domestic energy efficiency projects.
A ‘manageable chunks’ approach will be adopted in response to these audit recommendations as net-zero will be a long, unsettled journey with obstacles (such as
funding) that will influence the possible direction/path the Council should take. A route map will be developed which will contain what is achievable, however this will
not guarantee delivery and it should be noted that at this time it is unclear whether the focus will be on reducing emissions or energy due to the latter being a priority
of the Sustainable Futures Board. As such we will seek clarity from the Sustainable Futures Board on their prioritisation of these two linked, by essentially different
themes. The findings and recommendations of the LHEES and its delivery plan provide a list of initial steps for the Council to take to progress the decarbonisation of
heat and improve energy efficiency and as such contain therein the beginnings to building a pathway to zero by North Lanarkshire. The LHEES Delivery Plan will be
updated on an annual basis.
With regards to the wider (or all encompassing) pathway to net-zero/local energy plan, once the scope is clarified by the SRO for the Sustainable Futures Thematic
Board work will commence, subject to acquiring funding/resource to undertake the following:
• Baselining North Lanarkshire;
• Agreeing final scope of work;
• Identify internal and external resource requirements; and
• Commence work including engagement with relevant stakeholders to develop an action plan for North Lanarkshire. 
December 2025
Page 183 of 326

Page 184

3. Action Plan (continued) Climate Change 0900/2023/010 
Ref Finding
2 The recently revised governance arrangements for climate change need to be kept under review to ensure they are effective in progressing the
delivery of actions designed to achieve the Council’s climate change commitments and allowing effective oversight of progress by senior
management and elected members.
Our previous audit (issued May 2020) recommended that the governance arrangements for climate change required to be reviewed to ensure they reflected best practice and
incorporated the wide range of actions likely to be required to address the changing expectations and climate change commitments the Council was expected to deliver against.
As a result of this recommendation management undertook a review of the governance arrangements for climate change which resulted in the then Climate Change Group
being replaced with a Board responsible for monitoring and reviewing all climate related issues and decisions.
However, subsequent governance changes were introduced this year as a result of the refreshed Programme of Work which led to the Climate Change Board being dissolved
and a newly established Sustainable Futures Programme of Work (PoW) Thematic Board being created which, amongst other responsibilities, has oversight of all aspects of
the Council’s climate change duties. The aim of this theme is to ‘focus commitments to net zero carbon and the associated actions (including energy solutions and investments)
required to make it a reality’.
We were pleased to note the climate change corporate risk has been reviewed and updated resulting in an increased residual risk score from 16 to 20, due to the increased
uncertainty following the recent governance changes and that it is too early to evidence this new Board’s reliability/effectiveness in progressing/delivering necessary actions.
Internal Audit considers it important that the governance arrangements in this area are kept under review to ensure that the strategic Sustainable Futures Thematic Board is
able to effectively discharge this responsibility and/or whether there is a need for a climate change board/steering group or similar to be re-established at a more operational
level to develop and progress detailed plans/actions and report progress to the Thematic Board. 
Implication  Recommendation  Priority  Management response Implementation
Month/Year
The work of the Sustainable Futures
PoW Board may fail to adequately
address the full obligations placed on
the Council by its climate change
responsibilities.
The Depute Chief Executive (as SRO for the
Sustainable Futures Thematic Board) should ensure
that governance arrangements in this area are kept
under review to ensure that the Sustainable Futures
Thematic Board is effective and able to monitor and
progress the delivery of actions designed to achieve the
Council’s climate change commitments and allow
effective oversight of progress by senior management
and elected members.
Medium Agree
Andrew McPherson, Depute Chief Executive
(SRO for Sustainable Figures Board)
A review of the Sustainable Futures Thematic
Board will be undertaken against public
leadership guidance and compliance with the
public bodies climate change duties to determine
whether it provides effective oversight of climate
change commitments or if there is a need to re-
establish the former Climate Change Board. 
April 2024
Page 184 of 326

Page 185

3. Action Plan (continued) Climate Change 0900/2023/010 
Ref Finding
3 Climate change needs to be more effectively embedded into the Council’s decision-making processes. Given the challenge presented by delivering
net zero, the Council needs to be consistently considering the potential carbon impacts of all decisions more explicitly as part of its decision-
making processes.
Moving to net zero carbon represents a significant challenge for all organisations and requires a full understanding and transparency over the impact on carbon emissions of
policy choices and day-to-day operational decisions. This is particularly important for decision-makers in situations where there may be significant tensions between achieving
net zero/planned carbon emission reductions and other corporate ambitions. Integrating climate change effectively into decision making across all areas of the Council’s diverse
activities and policies/strategies is understandably complex, will take time and in itself presents both challenges and opportunities. These include financial constraints, access
to data required to support decision making processes and relevant skills and capacity.
There are clear examples of the Council bringing consideration of climate change issues into decision making as follows:
• Position Risk Assessment template within the project management framework requires consideration to be given as to whether the project fully aligns with carbon/net zero
objectives;
• Capital Programme bid process makes provision for consideration of climate implications in the methodology for prioritising bids;
• Specific impacts section within all reports to Committee allows report authors to document the environment/carbon impacts and corresponding guidance including a process
for undertaking carbon impact assessments to help inform this process; and
• initial work underway to incorporate more formally climate change/net zero ambitions into procurement procedures to embed sustainable procurement practice into regular
procurement activity as a means of contributing towards decarbonising public sector procurement.
A brief review of the impacts section of a sample of Committee reports indicates that it is not always clear that due consideration has been given to the carbon impacts with
often limited information on the potential carbon impacts conveyed to those tasked with making decisions. It is also unclear the extent to which carbon impact assessments
are being undertaken for incorporation into reports. We understand that at present there is no formal scrutiny process in place to ensure that carbon impact assessments are
being completed in accordance with corporate procedures, to check the accuracy/completeness of any such assessments and/or to ensure that appropriate documentation is
being retained by services to support these assessments.
Given the statutory requirement and the Council’s own commitment to achieve net-zero, consideration of the carbon impacts of all decisions needs to be given greater attention
so that processes and mechanisms can be put in place to more effectively inform decisions being made across the organisation. 
Implication  Recommendation  Priority  Management response Implementation
Month/Year
If climate
change/carbon
impacts  are not
incorporated as a key
part of all council
decision    making
processes, there is a
risk that   decisions
may be made which
run counter to or
impact the Council’s
ability to deliver its net
zero  obligations
and/or commitments.
The Depute Chief Executive (as SRO for the Sustainable
Futures Thematic Board) should:
(1) review how the climate change/net-zero carbon agenda
can be more effectively incorporated into the Council’s
decision-making processes with appropriate guidance
and/or training for staff developed as necessary;
(2) review how environmental impact consideration can be
better and/or more consistently reflected in committee
reports to ensure climate change/net zero implications are
given appropriate recognition as part of the Council’s
decision-making process;
(3) periodically reviews the effectiveness of decision-making
processes in considering climate change/net zero issues.
Amber Agree
Andrew McPherson, Depute Chief Executive (SRO for
Sustainable Figures Board)
A review of the Council’s existing arrangements for
incorporating climate change/net-zero carbon agenda into
decision-making processes will be undertaken as well as
consideration of other approaches/best practice. A report
will thereafter be presented to the Sustainable Futures
Board for determining how climate change (mitigation,
adaptation and sustainability) will be prioritised and
embedded within the organisation. This will include
ensuring climate impacts are fully considered in all
decision making and reviews to confirm effectiveness of
resulting arrangements. 
December 2024
Page 185 of 326

Page 186

3. Action Plan Climate Change 0900/2023/010 
Ref Finding
4 The completeness and accuracy of data gathering processes needs to be periodically reviewed.
Public bodies should carry out an assurance and verification process on greenhouse gas measures. The Public Sector Leadership on the Global Emergency Guidance
produced by the Sustainable Scotland Network (SSN) advises that formal internal assurance processes should be signed off by a senior leader. The Council has established
robust data collection arrangements in place for waste and fleet fuel. Recent resourcing changes have impacted on the information gathering arrangements for energy however
progress with the business stream database via a third party, Inspired Energy, to collate information on energy usage from all utility bills has strengthened this going forward.
Information is monitored within Services on an ongoing basis and provided annually for reporting in the annual climate report against targets.
There is a need to carry out periodic reviews of the completeness and robustness of these data sources to ensure the information produced from them (on carbon emission
tonnes) is accurate and reliable. We understand that recently, work has commenced to introduce indicator definition templates that will more formally set out the scope of
relevant data sources, how these will be collated into meaningful information for reporting, by whom and how frequently. 
Implication  Recommendation  Priority  Management response Implementation
Month/Year
Data sources used to calculate
emission information may be
incomplete and/or inaccurate and fail
to accurately reflect the performance
and progress across North
Lanarkshire to reduce emissions and
move towards net zero.
The Depute Chief Executive (as SRO for the Sustainable
Futures PoW Board) should ensure that the creation of
indicator definition templates for each emission source is
completed and shared with relevant service areas. Thereafter
arrangements should be put in place to ensure that periodic
reviews of the completeness and accuracy of each carbon
emission data source is undertaken to confirm that information
reported continues to be accurate and complete.
Low Agree
Lynda Stevenson, Climate Change Lead
Officer
This work has previously been undertaken;
however, an update is currently required.
Once complete periodic reviews will be
undertaken and will align with the annual
data collection exercise. 
December 2023
Page 186 of 326

Page 187

Audit reports are graded with an overall assurance opinion, and any issues and associated recommendations
are classified individually to denote their relative importance, in accordance with the definitions in the tables
below. 
Definition of audit assurance and recommendation categories
Assurance Confidence based on sufficient evidence that internal controls are in place, operating
effectively and objectives are being achieved. 
Assurance opinion 
Green Substantial
Assurance
A sound system of governance, risk management and control exists, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited. 
Green-Amber  Reasonable
Assurance
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for improvement were
identified which may put at risk the achievement of objectives in the area
audited. 
Amber-Red  Limited
Assurance
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management and
control to effectively manage risks to the achievement of objectives in the
area audited. 
Red  No
Assurance
Immediate action is required to address fundamental gaps, weaknesses or
non-compliance identified. The system of governance, risk management and
control is inadequate to effectively manage risks to the achievement of
objectives in the area audited. 
Organisational impact
Major The weaknesses identified during the review have left the Council open to significant risk. If
the risk materialises it would have a major impact upon the organisation as a whole.
Moderate The weaknesses identified during the review have left the Council open to medium risk. If the
risk materialises it would have a moderate impact upon the organisation as a whole.
Minor The weaknesses identified during the review have left the Council open to low risk. If the risk
materialises it would have a minor impact upon the organisation as a whole. 
Recommendation priority 
High
Significant control failure or weakness that, if not addressed, may lead to a major financial,
operational or reputational risk to the organisation and/or significantly impact the successful
delivery and achievement of the objectives of the area under review. Urgent/Immediate action
is required. 
Medium
Control failure or weakness that, if not addressed, may lead to a moderate financial,
operational or reputational risk to the organisation. Weakness may be individually significant
but is unlikely to affect the successful delivery and achievement of the overall objectives of the
area under review. The risk of error would, however, be significantly reduced if corrective
action was taken. Prompt action is required. 
Low
Control failure or weakness that may lead to a minor financial, operational or reputational risk
to the organisation. Weakness does not appear to significantly affect the ability to meet
objectives. Minor issue raised to improve the efficiency and effectiveness of controls.
Appendix 1 - Audit Grading
Page 187 of 326

Page 188

Theme
Foundation
(Structured and
Focused)
Advanced
(Comprehensive and
Professional)
Exemplary
(Innovative and
Transformational)
Strategy Action on climate change is
a strategic corporate
priority.
Key areas for action have
robust strategies in place to
inform delivery.
Climate    change    is
embedded in all
organisational strategies and
plans, and shapes decision
making and resource
allocation.
Targets Targets set with clear
baselines, boundaries,
inventories and interim
targets, supported by
delivery pathways and
aligned with national policy
objectives.
Targets/outcomes set for
key functions of the body,
including
procurement/supply chains,
upstream and downstream
impacts of the body's
functions.
Targets/outcomes  go
beyond net zero, aimed at
regenerative and holistic
sustainability
transformations.
Governance Structures are in place to
ensure oversight,
accountability  and
transparency in climate-
related decision making.
Climate change embedded
into decision making at all
levels, with evidence
reported of how this
influences decisions on
plans, projects and
resources.
The body is proactively
influencing partners, citizens
and stakeholders to drive
change at scale, locally,
regionally and nationally.
Delivery Climate action incorporated
in policy development and
service design, with policies
and projects in place and
actively managed
Coordination of delivery
across service areas and
projects to maximise
benefits and avoid
unintended consequences.
Working collaboratively to
align and scale policies,
projects and partnerships on
climate action
Finance Investigating how to align
spend with targets and
steps being taken to
progress.
Understanding of how to
align spend with targets.
Finance gaps identified and
work underway to secure
resources.
Resource and spend clearly
aligned with targets, climate
impact of investments being
managed, and
collaborations in place to
leverage in resources.
Performance Mandatory climate change
reporting used to inform
delivery and communicate
progress
Progress on climate change
is part of regular
performance monitoring
and accounts and corrective
actions taken.
Monitoring is above and
beyond mandatory
requirements and reporting
is shared and reviewed with
stakeholders.
Skills Key staff aware of how
climate change is part of
their roles and
responsibilities.
All staff understand how
climate change fits into their
activity and key staff taking
action to embed climate
change.
All staff empowered to act
and contribute to climate
targets and outcomes.
x
Appendix 2 – Extract from the Leaders’ Climate Emergency Checklist (Sustainable Scotland Network)
Page 188 of 326

Page 189

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref KH/SL Date 14/03/24 
Strategic Policy Framework - annual review and refresh 
From  Katrina Hassell, Chief Officer (Business and Digital)  
E-mail HassellK@northlan.gov.uk Telephone 07903 096 121 
Executive Summary
Since The Plan for North Lanarkshire was established  many strategies, policies, and plans
have been developed, reviewed, updated, approved at committee, and implemented to
support delivery of the council’s long-term vision of inclusive growth and prosperity for all. 
The Strategic Policy Framework has supported this process by providing corporate
Guidance to ensure that the development of new strategies, policies, and plans (and
updates to existing documents) remain aligned to the one plan direction and one council
approach, as well as relevant local and/or national strategy, policy, and legislative contexts. 
It also comprises a Review Programme to ensure the ongoing maintenance and monitoring
of strategies, policies, and plans within a standardised approach and pre-defined
timescales.   
The role of the Strategic Policy Framework in supporting the alignment of delivery plans
was recognised by Audit Scotland in their Best Value thematic work which reviewed the
leadership of the development of new local strategic priorities (as reported to the Policy
and Strategy Committee in December 2023): 
• “The council has a Strategic Policy Framework in place which ensures strategies,
policies, and plans remain aligned to its vision and support its shared ambition. This
includes all organisational level strategies and plans as well as operational strategies. 
• This framework sets out the formal review process and timetable to ensure all strategies
and plans remain aligned to overall council strategy and are fit for purpose. It also
provides a consistent approach in how these are developed, implemented, and
monitored across the council. The strategic policy framework itself is also subject to an
annual review.“ 
The Strategic Policy Framework and Programme of Work sit side by side to provide the
council with an integrated approach to strategic planning and delivery.  As such, the
Framework is subject to an annual review in cycle 1 each year at the same time as the
Programme of Work annual process. 
Following this year’s review, this report herewith therefore presents the Policy and Strategy
Committee with the refreshed Strategic Policy Framework in Appendix 1.  Within this,
Appendix A provides Guidance to support future development and monitoring processes,
while Appendix B sets out the accompanying Review Programme. 
Item 11
Page 189 of 326

Page 190

1. Background 
1.1 Initially approved in September 2018, the Strategic Policy
Framework sits alongside the Programme of Work in the
council’s strategic planning process to ensure that strategy
and policy remain connected to delivery in support of the
shared ambition and priorities set out in The Plan for North
Lanarkshire (as shown in the diagram on the right). 
1.2 As one of the strategic frameworks supporting The Plan for
North Lanarkshire, the Strategic Policy Framework sets out the high-level strategies,
policies, and plans which are subject to a formal review process to ensure they remain
fit for purpose and continue to align to the strategy of the council as well as relevant
local and national strategy, policy, and legislative contexts.  The Framework also aims
to ensure that strategies, policies, and plans are formulated, developed, implemented,
monitored, and reviewed in a consistent and transparent manner. 
1.3 Established in 2018, the Strategic Policy Framework was submitted to an extensive
review and refresh exercise in 2022.  This means that subsequent updates have been
able to be more lite touch, with the main changes being reflected in the Review
Programme. The well-established approach to the Strategic Policy Framework was
acknowledged in the Audit Scotland interim management report in June 2021 which
concluded by categorising the related recommendation from the 2019 Best Value
Assurance Report (BVAR) as complete given the “robust process in place to ensure
policies and strategies are kept up to date and regularly reviewed to ensure they are
aligned to The Plan and any laws and regulations”.     
1.4  More recently, the Strategic Policy Framework was recognised by Audit Scotland in
their Best Value thematic work which reviewed the leadership of the development of
new local strategic priorities. This acknowledged the role of the Framework in
supporting the council’s vision and priorities: 
• “Sitting alongside the Programme of Work, the council has a Strategic Policy
Framework in place which ensures the council’s strategies, policies and plans
remain aligned to its vision and support its shared ambition. This framework details
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Acknowledge the role of the Strategic Policy Framework in delivering The Plan for
North Lanarkshire, and in ensuring each of the strategies, policies, and plans listed
therein (as noted in Appendix B) are up to date, on a schedule to be updated at an
appropriate interval, and reported to the relevant committee, and
(2) Approve the refreshed Strategic Policy Framework and accompanying Review
Programme. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Page 190 of 326

Page 191

Elected Member and officer responsibilities for strategic planning and includes
details of Elected Member approval of individual strategies, policies, and plans.” 
1.5 Following the annual review process, this report presents the Policy and Strategy
Committee with the refreshed Strategic Policy Framework in Appendix 1.  Within this,
Appendix A provides Guidance to support future development, stakeholder
engagement, and ongoing monitoring processes, while Appendix B sets out the
accompanying Review Programme.  This Review Programme aims to ensure that each
of the strategies, policies, and plans supporting delivery of The Plan for North
Lanarkshire are up to date, on a schedule to be updated at an appropriate interval, and
reported to the relevant committee for Elected Members’ due consideration and
approval. 
2. Strategic Policy Framework 
Annual review 
2.1  The annual review of the Strategic Policy Framework traditionally focusses on three
main aspects - (i) any enhancements required based on the implementation of the
Framework in practice during the previous year, (ii) an update to the Review
Programme to reflect new (or updates to existing) strategies, policies, and plans during
the year and amendments to review dates, (iii) changes or updates required to the
Guidance to ensure council developments in this respect continue to comply with the
requirements of Best Value and the principles of good corporate governance (as set
out in CIPFAs national Delivering Good Governance in Local Government: Framework
(2016)).   
A summary of the findings from this year’s review, and actions implemented thereafter,
are noted in paragraphs 2.1.1. to 2.1.6 below. 
2.1.1 The Strategic Policy Framework Review Programme has continued throughout 2023
and 2024 to date with Elected Members approving new (or updated) strategies,
policies, and plans at committee in respect of the following: 
• Economic Regeneration Delivery Plan (ERDP) 2023-28 - February 2023
• Risk Management Strategy 2023-26 - March 2023
• Health and Social Care Strategic Commissioning Plan 2023-26 - March 2023
• Environment Pathway (replaces the previous Environment Strategy) - May 2023
• North Lanarkshire Children’s Services Plan 2023-26 - July 2023
• North Lanarkshire Community Justice Outcome Improvement Plan (CJOIP) - July
2023
• Tackling Poverty Strategy 2023-26 - September 2023 
2.1.2 The Review Programme has been updated with indicative timescales of when updates
are expected to ensure all strategies, policies, and plans continue to be kept under
review, are updated as required, and are reported to the relevant committee. This
provides the most up to date position as at January 2024.  It also supports forward
planning and an indication of when future consultation with stakeholders can be
expected. 
2.1.3 The Strategic Policy Framework hierarchy diagram has been updated, with new
strategies, policies, and plans added during 2023 being the Counter Fraud Policy
(approved at the Policy and Strategy Committee in September 2023), the Local Heat
and Energy Efficiency Strategy (LHEES) and Delivery Plan (approved by the Policy
and Strategy Committee in December 2023), and the North Lanarkshire Volunteering
Page 191 of 326

Page 192

Strategy 2023-26 (endorsed by the Communities Committee in March 2023). 
2.1.4 During the annual review process Chief Officers were asked to identify any new
strategies, policies, plans which may be required as a result of the implementation of
the Programme of Work to 2028 (approved by the Policy and Strategy Committee in
March 2023), or any existing ones that require to be amended to better align.  Changes
in this respect are reflected in the Review Programme in Appendix B and Elected
Members will have the opportunity to contribute to these developments through the
stakeholder engagement process set out in the Guidance. 
2.1.5 The supporting Guidance was reviewed and updated to ensure strategies, policies, and
plans continue to be developed in a standardised manner, consistently use a common
format, and roles and responsibilities are clear.  The main points of note in the updated
Guidance include the following: 
• The inclusion of the Children’s Rights and Wellbeing Impact Assessment (CRWIA)
process.  This incorporates the means by which to identify and assess the impact
of the Rights of the Child to support the development of strategies, policies, or
plans.  This approach mirrors the committee report template  and follows on from
the report approved at the Education, Children, and Families Committee in May
2023 (Embedding the United Nations Convention on the Rights of the Child
(UNCRC)) which provided added context and reiterated the need to make the
system changes required to ensure children’s rights are fully embedded in service
and policy development and delivery. 
• The importance of stakeholder engagement. In this respect the Guidance
reiterates roles and responsibilities in terms of the owner of a strategy, policy, or
plan (i.e. a Chief Officer) ensuring ongoing engagement with all relevant
stakeholders, including Elected Members, in the development of new (or updates
to existing) strategies, policies, or plans.  While the Guidance has a stand-alone
stakeholder engagement section, this requirement is also reflected within other
steps in the development and review cycle for a strategy, policy, or plan (i.e. roles
and responsibilities, gathering evidence, documentary control, communication and
implementation, and monitoring and review).  This reflects the findings by Audit
Scotland in their Best Value thematic work, which reviewed the leadership of the
development of new local strategic priorities: 
“Reflecting the roles and responsibilities detailed within the Strategic Policy
Framework, reviews of the Programme of Work are officer led. In reviewing
strategies and developing the Programme of Work to deliver the council vision,
lead officers engage all stakeholders, including elected members and strategic
partners, through appropriate mechanisms. These include Community Boards,
member/officer working groups and dedicated elected member events. This
ensures proposed Programme of Work activity presented to committee for
approval reflects strategic priorities identified by key stakeholders.” 
2.1.6 During the year the supporting Guidance was used in the development of new (or
existing) strategies, policies, or plans.  To provide added assurance in this respect and
also ensure compliance with the elements in the Guidance that help to demonstrate the
council’s fulfilment with the principles of good corporate governance (e.g. specifying
the intended impact on, or changes for, stakeholders including citizens and service
users (such as children’s rights, equalities, finance, and risk for example), ensuring that
communication methods are effective, and ensuring openness and comprehensive
stakeholder engagement), a lite touch assessment will be undertaken on all strategies,
policies, and plans updated during the year.  
Page 192 of 326

Page 193

The outputs from this assessment will be built into the annual position statement update
to the Audit and Scrutiny Panel (scheduled for cycle 4 each year) in line with their role
to provide an “independent review of the council's governance, risk management,
performance, and control frameworks”.  This will also support implementation of the
improvement action identified by Audit Scotland in their Best Value thematic work which
states that “the council should look to improve its existing processes for engaging
Elected Members on the overall strategic planning process”. 
2.2 The refreshed Strategic Policy Framework document is attached at Appendix 1.  This
sets out the hierarchy of strategies, policies, and plans which underpin delivery of the
long-term vision set out in The Plan for North Lanarkshire.  The Strategic Policy
Framework in Appendix 1 comprises two further appendices: 
• Appendix A: This contains the Guidance which sets out the process to be followed
to ensure strategies, policies, and plans are formulated, developed, implemented,
monitored, and reviewed in a consistent and transparent manner.
• Appendix B: This sets out the Review Programme for each high-level strategy,
policy, or plan within the Strategic Policy Framework.  This includes an indicative
timetable outlining when a strategy, policy, or plan will be reported to the respective
committee following completion of the development or review process.   
Supporting governance 
2.3 Governance of the Strategic Policy Framework will continue to be undertaken through
the key strategic oversight roles set out below. 
(1) In line with the Standards Commission for Scotland (Advice Note for Councillors
on distinguishing between their strategic role and any operational work, December
2021) - Elected Members will continue to “determine policy and to participate in
decisions on matters placed before them” and “provide strategic leadership; to
ensure financial stewardship is achieved through the efficient, economic and
effective use of resources; and hold the Chief Executive and senior management
team to account by scrutinising the implementation of policies, procedure and
expenditure”.
(2) In line with their remit and terms of reference to consider matters which are cross-
council in nature, the Corporate Management Team will continue to ensure
strategic oversight of the corporate strategies, policies, and plans developed by
the council and input into the development of such prior to submission to the
relevant committee for formal approval by Elected Members.
(3) In line with their responsibility to provide an independent review of the council's
governance, risk management, performance, and control frameworks and to
review performance to assess whether intended policy outcomes have been
achieved, the Audit and Scrutiny Panel’s challenge and scrutiny role will aim to
ensure the Strategic Policy Framework and its accompanying Review Programme
operate effectively and comply with the approved Guidance. 
Next steps 
2.4 The list of strategies, policies, and plans in Appendix B will be kept under review to
ensure updates are submitted to the relevant committee in line with the Review
Programme as well as the requirements of the Strategic Policy Framework and its
supporting Guidance.   
2.5 Further work will be undertaken, where required, to ensure ongoing alignment with
Page 193 of 326

Page 194

the Programme of Work to 2028.  The Strategic Policy Framework and its
accompanying Review Programme will continue to undergo an annual review and
update process with a view to reporting the most up to date position to the Policy and
Strategy Committee in March each year.   
3. Measures of success 
3.1 Measures of success will be evidenced through progress being made to deliver upon
the ambition statements in The Plan for North Lanarkshire.   
Evidence that progress is having a positive impact on inclusive growth and prosperity
for all local people and communities will realise the shared ambition where North
Lanarkshire is the place to Live, Learn, Work, Invest, and Visit. 
4. Supporting documentation 
4.1 Appendix 1 -  Strategic Policy Framework 
- Appendix A: Guidance 
- Appendix B: Review programme 
Katrina Hassell
Chief Officer (Business and Digital) 
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources?
Page 194 of 326

Page 195

Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The Local Government in Scotland Act 2003 introduced the duty of Best Value; this
requires that councils “make arrangements to secure continuous improvement in
performance”.  
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Work to review and refresh the Strategic Policy Framework and its accompanying
Review Programme contributes to the mitigation of the risks on the Corporate Risk
Register for managing strategic change and governance, leadership, and decision
Page 195 of 326

Page 196

making.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 196 of 326

Page 197

Strategic Policy Framework  
Appendix 1
Page 197 of 326

Page 198

2 
Document control
Title Strategic Policy Framework
Owner Katrina Hassell, Chief Officer (Business and Digital) Contact HassellK@northlan.gov.uk 
Governance group Policy and Strategy Committee
Author Susan Lawrie, Strategy and Performance Manager Contact LawrieS@northlan.gov.uk 
Revision history
Number Originator Date review commenced Revision description / record of change
1.0 Linda Johnston September 2018 Original framework created
2.0 Linda Johnston September 2019 Annual review
3.0 Linda Johnston September 2021 Annual review and refresh and alignment to the other strategic frameworks
4.0 Linda Johnston September 2022 Annual review and refresh and alignment to the other strategic frameworks
5.0 Linda Johnston September 2023 Annual review and refresh and alignment to the other strategic frameworks and
the new Programme of Work to 2028 
Document approvals
Number Governance group Date approval granted Date approval to be requested (if document still draft)
1.0 Policy and Resources Committee September 2018 
2.0 Policy and Strategy Committee September 2019 
3.0 Policy and Strategy Committee March 2022 
4.0 Policy and Strategy Committee March 2023 
5.0 Policy and Strategy Committee  March 2024 
Consultation record (for most recent update)
Status of document consulted upon Strategic Policy Framework
Stakeholders consulted / date Corporate Management Team (01/02/24) 
Strategic alignment 
Next review commencement date
Review date September 2024 
The Plan for North Lanarkshire (all 5 priorities and 25 ambition statements), Programme of Work, Strategic Governance Framework, Strategic Performance
Framework, Strategic Self-Evaluation Framework, Project Management Framework, Framework for Demonstrating Improved Outcomes for Communities.
Page 198 of 326

Page 199

3 
Table of contents 
Page
number
Introduction  …………………………………………………………………………………………….. 4 - 5
Strategy, policy, and legislative context in local government …………………………..……... 6 - 7
- National strategies, policies, and frameworks …………………………………………………... 6
- Local government policy framework …….…………………………………………………......… 6-7
Strategies, Policies, and Plans in North Lanarkshire Council …………………………...…….. 8 - 14
- Strategic planning framework …………………………………………………………...….…….. 8
- Definitions  …...………………………………………………………………………………..……. 8
- Framework hierarchy  ………………………………………………………………….…………... 8-10
- Overarching approach  ………………………………….…………………………………….…… 11
- Roles and responsibilities  ………………………………………………………………………… 11-12
- Non-negotiable standards  ………………………………………………………..………………. 12-13
- Development and review cycle  …...…………………………..………………………….………. 13
- Review programme ………………………………………………………..………………….……. 13
- Governance ………………………………………………………..………………….……………. 13-14
Appendix A: Guidance  …………………………………………………………………..….…………. 15 - 25
Appendix B: Review programme ………………………………………………................................ 26 - 40 
Page 199 of 326

Page 200

4 
Introduction 
The Plan for North Lanarkshire sets the long-term strategic direction for
the council, partners, and other stakeholders and, most importantly, for
each unique local community and the people who Live, Learn, Work,
Invest, and Visit within North Lanarkshire.  It’s a Plan with a shared
ambition of inclusive growth and prosperity for all and a fairer distribution
of wealth across all local communities. 
The long-term ambition of The Plan for North Lanarkshire coupled with the
fast moving, unpredictable, and increasingly challenging and complex
local government environment, means planning and change are constantly
evolving and ongoing visibility into all programmes of work and their
interconnections - as well as the high-level strategies, policies, and plans
supporting The Plan - is essential.   
The Programme of Work provides a clear roadmap for the work of the
council and sitting alongside this - as a key aspect of the council’s
strategic planning framework - is the Strategic Policy Framework.  This
ensures that strategy and policy remain connected to delivery in order to
collectively facilitate a co-ordinated approach to identifying the resources
and working practices needed to support delivery of the long-term vision. 
The Strategic Policy Framework - set out within this document - is one of
the inter-related corporate frameworks that are key to evaluating the
success of The Plan for North Lanarkshire and assessing delivery of the
Programme of Work (while ensuring each stage of delivery towards
achieving the overall ambitions is appropriately aligned, planned, guided,
implemented, monitored, and governed): 
• Strategic Policy Framework
• Strategic Governance Framework
• Strategic Performance Framework
• Strategic Self-Evaluation Framework
• Project Management Framework 
• Framework for Demonstrating Improved Outcomes for Communities 
To ensure these frameworks remain aligned to The Plan for North
Lanarkshire, all are on a regular review and refresh programme.  This also
ensures the council is proactive in responding to social, economic, and
environmental trends and changes in legislation and governance, as well
as the broad range of national policy changes and new developments.
Strategies and policies created by national and local government affect
everyone in the community in some way - determining what services will
be provided and the level of those services, what kinds of development will
occur in a community, and what a community’s future will be. 
A central role of local government, strategy and policy development also
supports good governance and promotes operational efficiency by: 
• Enabling compliance with relevant legislation, other standards, and
community expectations.
• Providing a shared strategic vision and clear direction for all.
• Providing clear guidelines to make it easy for employees, and the
public, to understand the service delivery, management, and
governance approaches of a local authority and ensure consistency in
implementation.
• Supporting quality assurance and continuous improvement, and the
management of risk. 
The council’s approach to strategy and policy development is set out on
pages 8 to 14 of this document. This specifies the hierarchy of strategies,
policies, and plans which underpin delivery of the long-term vision set out
in The Plan for North Lanarkshire.   
Through a structured approach, the Strategic Policy Framework aims to
ensure that strategies, policies, and plans are formulated, developed,
implemented, monitored, and reviewed in a consistent and transparent
manner across the council.  The seven steps in the development and
review cycle, depicted on page 15, outline the process in this respect. 
This includes stakeholder engagement which is a key aspect of the
development and review cycle for a strategy, policy, or plan. 
Elected Members and officers are at the heart of local government policy
and delivery - with Members determining policy at the start of the process,
officers managing and implementing policy in the middle, and Members
scrutinising delivery at the end.  Key roles and responsibilities in this
respect are summarised on page 11. 
The Strategic Policy Framework sets out the high-level strategies, policies,
and plans which are subject to a formal review process to ensure they
remain fit for purpose and aligned to the council’s long-term vision.  A
Review Programme in Appendix B (pages 26 to 40) helps to support this.  
Page 200 of 326

Page 201

5 
Use of terminology
Policy, strategy, and plan are words that cover a wide spectrum of dimensions and hierarchies. They range from: 
• Values and visions, policy direction, strategy documents, and strategic planning approaches, to detailed operational planning.
• Comprehensive wide scale planning to specific programme planning.
• A long-term 10 to 20-year time horizon, to a 5-year plan, a 3-year rolling plan, or an annual operational plan.
• National to regional to local plans. 
As such, the terminology used nationally and locally can vary considerably and the terms strategy, policy, and plan have often become interchangeable. 
This Strategic Policy Framework document does not attempt to examine or assess the correct use of the terms strategy, policy, or plan.  While it sets out a
succinct definition and naming convention for each term to ensure a common language and clear understanding across the council, its key purpose is to
provide a structured corporate approach to ensure (a) the high-level strategies, policies, and plans support delivery of The Plan for North Lanarkshire, and
(b) these strategies, policies, and plans are formulated, developed, implemented, monitored, and reviewed in a consistent and transparent manner. 
Page 201 of 326

Page 202

6 
Strategy, policy, and legislative context in local government 
National strategies, policies, and frameworks
Local government in Scotland operates within a legal framework that expresses national policy within Scotland and the priorities of the UK government. 
These policies cover every area of life from birth to death and all aspects of environmental, social, and economic regulation. 
Although policy and legislation are interrelated, each has a distinct function - a policy may have an associated piece of legislation that helps to enforce part,
or all, of it.  Or a policy may not be the result of legislation at all. 
The Scottish Government formulates and implements policy on devolved matters and introduces most bills (draft statutes) to be considered by the Scottish
Parliament.  The Scottish Parliament is the lawmaking body for devolved matters and is responsible for scrutinising the work and policies of the Scottish
Government. The Scottish Government regularly consults on proposed areas of policy, such as a draft strategy or at the early stages of planning a Bill before
it is drafted. Interested parties or individuals may respond to a consultation. All consultation responses are analysed and used in the decision-making
process. The Scottish Government maintain a dedicated website (https://consult.gov.scot/) where anyone can participate in current consultations. 
Local government policy framework
In local government, policies can take the form of: 
• The process by which the UK or Scottish Government translate their political vision into programmes and actions to deliver outcomes and desired
changes in the real world.  These policies are cascaded to local government (and/or other public sector bodies) for implementation in line with legislation
(i.e. they are statutory), or for guidance purposes (i.e. they are not statutory).  
• A course or general plan of action on a particular subject to be adopted by the local authority.
• A statement of the local authority’s position, intent, or action. 
The policies created by national and local government affect everyone in the community in some way, determining: 
• What services will be provided to the residents, the level of those services, and the manner in which those services will be provided.  Some services are
mandated by law, others while not mandated are prudent to provide, while others are discretionary.
• What kinds of development will occur in a community.
• What a community’s future will be. 
Legislation Policy
• Sets out the law - the procedure or standard that people and
organisations must follow.
• Can be used to enforce the course of actions within a policy. 
• New laws may be developed to enforce part or all of a policy.
• Tend to be fixed for much longer periods of time.
• Must comply with existing law where it is required to do so, but may also lead to
the proposal of new laws.
• May be adopted to fulfil legislative commitments.
• Tends to evolve and adapt over time as a result of review processes. 
• Sets out what local government plans to do towards achieving a long-term
purpose or goal.
Page 202 of 326

Page 203

7 
Policy decisions could be the adoption of a vision for a community, a comprehensive plan, a budget, or a policy relating to a specific issue such as allowing
or prohibiting a specific activity. 
The policy making process is not always easy and there are tough and courageous decisions to be made, sometimes on competing priorities.  Often there is
no right or wrong answer, which means it should come down to an objective search for the right solution at that time.  It could be that policies which, for
example, are set to benefit one area of service may have an adverse impact on another area of service.  In cases like this tough decisions are required to
identify how best to direct public resources to ensure that the actions taken represent a whole system approach and the best possible solution that improves
the lives of local people. 
Page 203 of 326

Page 204

8 
Strategies, Policies, and Plans in North Lanarkshire Council 
Strategic planning framework
The Plan for North Lanarkshire is well established as the long-term strategy for the council, partners, and other stakeholders and, most importantly, for each
unique local community and the people who Live, Learn, Work, Invest, and Visit within North Lanarkshire.  It sets out the shared ambition of inclusive growth
and prosperity for all and establishes the vision for a fairer distribution of wealth across all local communities.  It provides a very clear focus and compelling
narrative in terms of what the council is working towards in the long-term.   
As a key resource for delivering and sustaining the ambition, the Programme of Work provides a clear roadmap for work across council services and with
partners.  It allows for plans of action to be developed that inform the projects, activities, services, technologies, and resources that need to be harnessed in
order to seize the most and best opportunities to deliver on the long-term strategy, while achieving value for money in the here and now.  The Programme of
Work process is also instrumental in bringing together the elements that support local development, enterprise activities, and community investment in a
cohesive manner.   
Initially approved in September 2018, the Strategic Policy Framework sits alongside the Programme of Work in the
council’s strategic planning framework to ensure that strategy and policy remain connected to delivery in support of the
long-term vision.  This ensures that the high-level inter-related strategies, policies, and plans remain aligned to The Plan
for North Lanarkshire and collectively enable the resources and working practices needed in order to maximise impact -
at scale and pace - to facilitate delivery of the shared ambition.  Figure 1. shows how collectively the Strategic Policy
Framework and Programme of Work support The Plan for North Lanarkshire and the shared ambition of inclusive growth
and prosperity for all established therein. 
Definitions
There are many definitions of strategies, policies, and plans in existence in both the public and private sector, but the
Strategic Policy Framework adopts the following naming convention to ensure consistency across the council.  It is
recognised though that some national or statutory strategies, policies, and plans may follow a different convention. 
• Strategies - set out high-level medium to long-term aims that provide direction for the policies and plans required to
deliver on the programmes, projects, and activities in support of The Plan for North Lanarkshire.
• Policies - form the basis for day-to-day decisions in a regulated manner in order to support a consistent approach to implementation and delivery of the
services and the long-term vision.
• Plans - contain a detailed plan of action for delivery in the short to medium term in order to achieve specific aims within a specified timeframe. 
The local government policy framework section on page 6 specifies the three forms which policies can take within local government. 
Framework hierarchy
The hierarchy within the Strategic Policy Framework (depicted in Figure 2. on page 10) sets out the documents that define the council’s high-level activities in
line with The Plan for North Lanarkshire; this is categorised into three levels as detailed below.  
Figure 1:
Strategic Planning Framework
Page 204 of 326

Page 205

9 
1. The corporate strategy that defines the overall strategic direction for North Lanarkshire over the long-term. 
2. Organisational level strategies or plans with strategic implications, corporate level risk, or corporate level statutory or regulatory requirements which
refer to:
(a) council strategies or plans, or 
(b)  partnership strategies or plans. 
3. Operational strategies, policies, or plans which refer to:
(c) practices across service specific activities (e.g. the environment or diet and nutrition).
(d) matters in respect of specific cross council activity which are relevant to all managers and employees (e.g. supporting attendance). 
Applying a hierarchical approach aims to provide a clear structure for the development of high-level strategies, policies, and plans that identifies lines of
authority and reporting.  This also aims to differentiate between strategies or polices that facilitate delivery of the vision set out in The Plan for North Lanarkshire,
are designed to ensure compliance with legal requirements, or are required to standardise internal processes.  It also helps to produce clear, well-developed
documents that are easy to follow, easy to manage, and easy to update as required. 
The Strategic Policy Framework itself is guided and regulated by the overall statutory, regulatory, and governance requirements within which the council
operates (as set out in the Strategic Governance Framework). 
Page 205 of 326

Page 206

10
Figure 2:
Strategic
Policy
Framework
hierarchy
Page 206 of 326

Page 207

11 
Overarching approach
Where it has been appropriate to do so, several strategies, policies, and plans in the Strategic Policy Framework have been combined or specifically aligned. 
This aims to integrate related activities and review timescales and ensure that inter-related strategies, policies, and plans are aware of, and take account of,
common factors in order to align resources and maximise impact.  The strategies, policies, and plans that have been combined or aligned to date are listed in
the table below - this approach will continue to be part of the Strategic Policy Framework where it is relevant to do so. 
Overarching approach Strategies, policies, and plans aligned within the overarching approach
Financial Strategy
• Medium-Term Financial Plan
• Revenue Resources Budget Strategy
• Treasury Management Strategy
• Capital Strategy
• Financial Regulations and Scheme of Financial
Delegation
Digital and IT Strategy
• Acceptable Use of ICT Policy
• Data Protection Policy 
• Information Security Policy
• Payment Card Industry Data Security Policy
• Records and Information Management Policy
• Records Management Plan
Environment Pathway 
• Air Quality Action Plan
• Biodiversity Action Plan
• Climate Ready Clyde Adaptations Strategy
• Contaminated Land Strategy
• Core Paths Plan
• Food Growing Strategy
• Single Use Plastic Action Plan 
• Tree Asset Management and Operational Woodland
Plan 
• While referenced within the Environment Pathway document to ensure appropriate alignment and integration, the
following are standalone strategies, policies, or plans due to the critical role each has in enabling delivery of the
place-based aspects of The Plan for North Lanarkshire and the extent of corporate requirements and
responsibilities set out therein - Local Development Plan, Open Space Strategy, Climate Plan, Active Travel
Strategy 2021-31, and the Local Transport Strategy. 
Roles and responsibilities
Elected Members and officers are at the heart of local government policy and delivery and how they work together is fundamental to success.  Good
governance underpins these working relationships, which in turn provide a firm foundation for Best Value. 
The role of Elected Members “is to determine policy and to participate in decisions on matters placed before them. It is not to engage in direct operational
management of the council’s services”.   
It is to “provide strategic leadership; to ensure financial stewardship is achieved through the efficient, economic and effective use of resources; and hold the
Chief Executive and senior management team to account by scrutinising the implementation of policies, procedure and expenditure”. 
(Standards Commission for Scotland, Advice Note for Councillors 
on distinguishing between their strategic role and any operational work, December 2021) 
The Local Government (Scotland) Act 1973 requires the council to maintain a list specifying those powers which are exercisable by officers, and stating the
Page 207 of 326

Page 208

12 
title of the officer who exercises that power.  To fulfil this requirement, the council has a Scheme of Delegation to Officers to accompany the Scheme of
Administration: 
• The Scheme of Delegation to Officers sets out the powers delegated by the Council to officers, pursuant to the Local Government (Scotland) Act
1973.  The Scheme is intended to facilitate the efficient conduct of council business by clearly setting out the nature and extent of the powers delegated
to officers by the Council.  All decisions require to be made in line with council policy, procedure, guidance and (where appropriate) within approved
budget.  
• The Scheme of Administration provides the details and different functions of committees and other groups of the council, and the delegation of
authority to carry out the functions of the council.   
Non-negotiable standards
To support the development of new strategies, policies, and plans within the Strategic Policy Framework - or updates to existing documents - a set of five
non-negotiable standards are in place within the council.   
The five non-negotiable standards are designed to ensure consistency across the inter-related corporate frameworks (Policy, Governance, Performance,
Self-Evaluation, and Project Management), but more importantly ensure that strategy and policy development supports delivery of the council’s long-term
vision, ensures compliance with relevant legislation, and supports effective use of resources in line with Best Value requirements. 
The set of five non-negotiable standards are designed to ensure that development of strategies, policies, and plans carried out
in line with the Strategic Policy Framework and its accompanying Review Programme are: 
• Aligned - to The Plan for North Lanarkshire so that aims, objectives, and action plans support the achievement of the
council’s long-term vision by reflecting contributions to the priorities and ambition statements.   
• Consistent - in their formulation, development, and implementation so there is a structured approach to making best use
of public resources through clear strategies, policies, and plans that ensure resources are deployed to achieve the
council’s strategic priorities, meet the needs of local communities, and deliver continuous improvement.  Consistency in
the process will also ensure there is a clear understanding of the purpose and role of each strategy, policy, or plan in
terms of the service delivery, management, and governance approaches of the council. 
• Transparent - in terms of ensuring appropriate consultation and communication in the development and implementation
of strategies, policies, and plans.  The development process should be appropriately informed by evidence.  It should be
clear that the council has engaged with, and involved, all relevant stakeholders as well as equality groups to improve
and inform the relevant policies and practices, and that socio-economic disadvantage has been taken into
consideration when making strategic decisions. 
• In context - ensuring that the development process takes cognisance of, and is responsive to, relevant legislation and
other standards to ensure full compliance in this respect.  Identifying the case for a new strategy or policy should also involve ensuring cross council
collaboration and a one council approach so there is no replication of other practices already in place to achieve the desired results.  This collaboration
should also avoid strategies or policies pulling in different directions by ensuring a positive impact of a policy on one aspect of North Lanarkshire’s
population, for example, does not have a negative effect on another.  Changes in the fast moving, uncertain, and complex local government
Figure 3: 
Five non-negotiable standards
Page 208 of 326

Page 209

13 
environment within which the council operates also require due consideration in the development and review process.  As such, this should therefore
involve consideration of residual impacts of the coronavirus pandemic and the resultant social and economic effects on the people and communities of
North Lanarkshire and any need to realign any strategy, policy, or plan in light of this. 
• Balanced - in terms of ensuring each item within the Strategic Policy Framework is on a regular programme of review so that it remains up to date and
is reported to the relevant committee.  While regular monitoring and review processes are important to ensure strategies, policies, and plans remain fit
for purpose and continue to align to the long-term vision of the council, this needs to be proportionate to the resources expended, outcomes expected,
and the associated risks. 
Development and review cycle
A set of guidance is in place - see Appendix A - which outlines the steps in the process to ensure strategies, policies, and plans are formulated, developed,
implemented, monitored, and reviewed in a consistent and transparent manner across the council. 
This also outlines specific roles and responsibilities in the development and review cycle and provides links to templates to be used to produce the strategy,
policy, or plan document in line with Strategic Policy Framework requirements and the council’s brand guidelines. 
Review programme
Appendix B outlines the Review Programme for each strategy, policy, or plan within the Strategic Policy Framework.  This includes an indicative timetable (as
at January 2024) outlining when a new (or updated) strategy, policy, or plan will be reported to the respective committee following completion of the review
and update process.  It should be noted that this Review Programme only refers to substantial updates to the respective strategy, policy, or plan document
which are required to re-iterate the intent halfway through the lifespan of the document for example, or because the document has reached the end of its life. 
It does not capture supporting action plans which are reviewed, updated, and reported periodically through other means. 
The timescale between the date the review is scheduled to take place and approval at committee may vary depending on the extent of the review and
stakeholder engagement process that requires to be undertaken for a specific strategy, policy, or plan.  As a rule of thumb all updated strategies, policies,
and plans require to be presented to the relevant committee within three months of the conclusion of the review process. 
All reports scheduled to be presented to committee with a new, or updated, strategy, policy, or plan document that is listed in Appendix B should be
considered by the Corporate Management Team in advance. 
Governance 
Strategic oversight
Governance of the Strategic Policy Framework will continue to be undertaken through the key strategic oversight roles set out below. 
(1) In line with the Standards Commission for Scotland (Advice Note for Councillors on distinguishing between their strategic role and any operational
work, December 2021) - Elected Members will continue to “determine policy and to participate in decisions on matters placed before them” and
“provide strategic leadership; to ensure financial stewardship is achieved through the efficient, economic and effective use of resources; and hold the
Chief Executive and senior management team to account by scrutinising the implementation of policies, procedure and expenditure”.
(2) In line with their remit and terms of reference to consider matters which are cross-council in nature, the Corporate Management Team will continue to Page 209 of 326

Page 210

14 
ensure strategic oversight of the corporate strategies, policies, and plans developed by the council and input into the development of such prior to
submission to the relevant committee for formal approval by Elected Members. 
(3) In line with their responsibility to provide an independent review of the council's governance, risk management, performance, and control frameworks,
and to review performance to assess whether intended policy outcomes have been achieved, the Audit and Scrutiny Panel’s challenge and scrutiny
role will aim to ensure the Strategic Policy Framework and its accompanying Review Programme operate effectively and comply with the approved
Guidance. 
Alignment with the Strategic Governance Framework
The council’s Strategic Governance Framework brings the principles of good governance together with legislative requirements and management processes
by which the council is directed and controlled and through which it is accountable to, engages with, and leads the local community. 
In practice, governance comprises the combination of structures, strategies, policies, plans, frameworks, systems, processes, rules, codes, procedures,
cultures, and values that are used to direct, control, and manage a local authority’s operations and activities (the list of items referred to in this paragraph are
hereinafter referred to as elements and mechanisms).  This includes political, economic, social, environmental, legal, and administrative structures and
processes, and other arrangements, as encapsulated in the principles defined in the Strategic Governance Framework.   
These elements and mechanisms define roles and responsibilities and accountabilities and establish mechanisms to enable the council to effectively pursue
the long-term ambition set out in The Plan for North Lanarkshire, while ensuring this is underpinned with control and the management of risk, and: 
• Resources are directed in accordance with agreed policies and according to priorities, and in line with corporate project management procedures.
• There is sound and inclusive decision making.
• There is clear accountability for the use of those resources in achieving defined outcomes for service users and local communities. 
As the council’s local code of governance, the Strategic Governance Framework is key in supporting the national good governance principles set out in the
Good Governance in Local Government: Framework (CIPFA, 2016). 
As the Strategic Policy Framework (and its accompanying Review Programme) provide a way to ensure that strategies, policies, and plans are formulated,
developed, implemented, monitored, and reviewed in a consistent and transparent manner across the council, it sits alongside the Strategic Governance
Framework Review Programme in outlining the council’s policy context in this respect.   
The Strategic Policy Framework guidance (in Appendix A) also supports more specific compliance with the principles of good governance, for example in
ensuring the council has effective counter fraud and anti-corruption arrangements in place.  As such the guidance sets out the requirement for the
development of strategies, policies, and plans to consider any alignment required with the council’s Counter Fraud Policy and the need for any subsequent
actions to be implemented as a result of such considerations. 
Page 210 of 326

Page 211

15 
Appendix A: Guidance 
Development and review cycle 
The development and review cycle refers to the different phases in the strategy or policy making process.  This outlines the steps required to ensure
strategies, policies, and plans are formulated, developed, implemented, monitored, and reviewed consistently and transparently. 
There are seven steps in the cycle within the Strategic Policy Framework; these are set out in Figure 4. below.   
These steps should be applied to all strategy and policy development and review work undertaken in the council in line with the Strategic Policy Framework.   
While these steps provide a consistent and standardised approach to strategy and policy development in line with the Strategic Policy Framework and
Review Programme, specific strategies or policies may have their own legislative requirements, or there may be a need to customise particular steps in order
to best meet the needs, operating environment, and desired outcomes of the strategy or policy being developed or reviewed.   
Each of the steps outlined in the process are set out in more detail on pages 16 to 25. 
Figure 4: 
Development and review cycle 
Page 211 of 326

Page 212

16 
Development and review cycle 
1. Identify and scope
(i) Clarify roles and responsibilities
Owner
• In all cases, an owner for a strategy, policy, or plan should be identified - this should be a Chief Officer who is responsible for:
- Ensuring that the strategy, policy, or plan is developed in line with the long-term vision set out in The Plan for North Lanarkshire as well as relevant legislation.
- Identifying the case for a new strategy or policy, ensuring this new development does not replicate other available means of achieving the desired results, and ensuring
compliance with the five non-negotiable standards (see pages 12 and 13).
- Assigning an author / content manager and ensuring adherence to the Strategic Policy Framework guidance.
- Ensuring reviews are carried out in line with the timescales set out in the Strategic Policy Framework Review Programme. 
- Making sure consultation takes place with all relevant stakeholders.
- Ensuring that strategic oversight is carried out by the Corporate Management Team.
- Seeking approval of new strategies, policies, or plans by Elected Members through the relevant council committee.  Note - committee approval is also required for
significant changes to existing strategies, policies, and plans.
• The policy owner must ensure performance of a strategy, policy, or plan is monitored and evaluated to assess achievement and effectiveness of the desired outcomes.
• The policy owner must also be aware that Elected Members and officers are at the heart of local government policy and delivery - with Members determining policy at
the start of the process, officers managing and implementing policy in the middle, and Members scrutinising delivery at the end.  The owner of a strategy, policy, or plan
should therefore ensure ongoing engagement with Elected Members, as appropriate. 
Author / content manager
• In all cases an author / content manager should be identified - this should be an officer in a senior officer role who is responsible for:
- Managing / developing the strategy, policy, or policy document in line with the Strategic Policy Framework guidance.
- Liaising with service colleagues and subject matter experts across the council regarding evidence, stakeholder feedback, and content.
- Ensuring compliance with accessibility requirements for public sector bodies which came into effect in September 2018, the corporate branding guidelines, and the
Strategic Policy Framework design process (see step 2 (iii)).  This includes uploading published documents to the council’s website and ensuring this is kept up to
date.
- Carrying out the relevant impact assessments (see step 1 (iii) below) as part of the development and review process. 
(ii) Identify the issue and formulate the response
As noted on page 6 of the Strategic Policy Framework, policies in local government can take the form of: 
• The process by which the UK or Scottish Government translate their political vision into programmes and actions to deliver outcomes and desired changes in the real
world.  These policies are cascaded to local government (and/or other public sector bodies) for implementation in line with legislation (i.e. they are statutory), or for
guidance purposes (i.e. they are not statutory).  
• A course or general plan of action on a particular subject to be adopted by the local authority.
• A statement of the local authority’s position, intent, or action. 
The role of the council in identifying the issue and formulating the response depends on which of the above has informed the development of the strategy, policy, or plan. 
Policies cascaded to local government will generally be for implementing or for guidance.  Policies developed by the council will require the formulation step to be put into
practice - as the first step in sound policy-making is properly identifying a problem and designing the right response(s) to address it. 
Page 212 of 326

Page 213

17 
(iii) Assess impacts
Impact assessments are a means of predicting the potential impact of a strategy, policy, or plan on different aspects of council business or on service users, local
communities, individuals, or groups. The following impacts must be considered in the development and review process: 
(1) Public Sector Equality Duty and Fairer Scotland Duty
• The Public Sector Equality Duty requires the council to assess the impact of applying a proposed new or revised policy or practice against the needs of the
general equality duty and to publish the results of the assessment. As a general fail-safe rule, if the policy or practice is about people then an equality impact
assessment should be carried out.  
• The Fairer Scotland Duty requires the council to consider what more it can do to reduce the inequalities of outcome, caused by socio-economic disadvantage, in
any strategic decision-making or policy development context, and publish a written assessment showing how it has done this.   
All covering reports for strategies, policies, and plans should state (a) whether there is a Public Sector Equality Duty and/or Fairer Scotland Duty impact, (b) if so
what that impact is, and (c) if an assessment has been completed and published. Please note once completed, a summary of this assessment requires to be
published on the council’s website ( https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-scotland-duty-impact-assessments ) and
included in the covering committee report, where it is relevant to do so.   
Note where a strategy, policy, or plan does have an impact in this respect it must also be reflected in the document itself.   
There is one form to complete the assessment for both a Public Sector Equality Duty and Fairer Scotland Duty impact and also supporting guidance; this information
is available on MyNL: https://mynl.co.uk/knowledge-base/equality-impact-assessments/   
For any queries in completing this section please e-mail: CameronAu@northlan.gov.uk. 
(2) Financial - Where there is a financial impact, please ensure this is summarised or stated clearly if none are anticipated.  In doing so please ensure that all financial
impacts have been discussed and agreed with Finance.  For any queries, please liaise with colleagues in Finance. 
(3) HR policy - Where there is a HR policy impact, please ensure this is summarised or stated clearly if none are anticipated.  In doing so please ensure that all HR
policy impacts have been discussed and agreed with People Resources.  For any queries, please liaise with colleagues in People Resources. 
(4) Legal - Where there is a legal impact, please ensure this is summarised or stated clearly if none are anticipated.  In doing so please ensure that all legal impacts
have been discussed and agreed with colleagues in Legal and Democratic, particularly with regard to any references to general legal matters, statutory
considerations (including employment law considerations), or new legislation and the impact this may have on the council.  For any queries, please liaise with
colleagues in Legal and Democratic. 
(5) Data protection - If the strategy, policy, or plan contains or involves the processing of personal data and, if so, if the processing of this personal data is likely to
result in a high risk to the data subject, then a Data Protection Impact Assessment (DPIA) requires to be carried out.  Further guidance, and the template to complete
a DPIA, is available on InsideNL. 
Once the DPIA is completed, it should be e-mailed to the regulation and governance team in legal at dataprotection@northlan.gov.uk.
For any queries or further advice regarding data protection impacts, please refer to the guidance on InsideNL or contact the regulation and governance team in legal
(e-mail: dataprotection@northlan.gov.uk ). 
(6) Technology / Digital - Digital First remains the basis for all service redesign and the Digital and IT Strategy highlights how new technology, service redesign, and
connectivity will be used to deliver the digital ambition in terms of Digital Communities, a Digital Economy, and a Digital Council.  Any service redesign aspects within
Strategic Policy Framework items must be considered within the context of Digital First and the Digital and IT Strategy.   
Page 213 of 326

Page 214

18 
Where there is an impact on any digital or technology matter - for example IT infrastructure, digital transformation, service redesign / business change processes,
data management, or connectivity / broadband / Wi-Fi, or licensing, then colleagues in Business and Digital should be consulted with to enable a one council
approach in this respect and to ensure whole system governance.   
Where the impact identifies a requirement for significant technology change, an assessment requires to be carried out by the Enterprise Architecture Governance
Group (EAGG). 
For any queries regarding the technology / digital impact, please refer to the checklist within the report guidance on InsideNL. 
For any queries or advice, please e-mail: BusinessAndDigitalPMO@northlan.gov.uk 
(7) Environmental / Carbon - The impact in this respect must be considered for all strategies, policies, plans, strategic frameworks, or practices.  It should also be
considered where a strategic decision requires to be made (e.g. involving a major procurement or commissioning exercise, a charging policy, a budget decision, or a
workforce / resource plan), where a project concerns major service redesign or transformation activity, or where there is an impact on the measurement of the
council’s carbon footprint (i.e. it concerns waste, transportation, buildings, housing, or fuel poverty).  To do this an impact assessment must be carried out (as per the
template on InsideNL) and a summary of the impact must be included in the strategy, policy, or plan document, where relevant. 
For any queries regarding defining the environmental / carbon impact, please refer to the checklist within the report guidance on InsideNL.
For any further queries or advice please e-mail: CarbonGroup@northlan.gov.uk   
(8) Risk Management - Key risks surrounding a decision and how these are or will be managed or implemented should always be highlighted in the narrative of the
strategy, policy, or plan.  The audience should receive assurance that the author has carried out a proportionate risk assessment related to the issue and
recommendations in compliance with the council's decision-making risk management guidance.  In offering this assurance the author is confirming that: 
a. Risk assessment documentation relating to the decision has been completed and reviewed by relevant senior management.
b. All significant risks relating to the strategy, policy, or plan - and how these will be managed - are highlighted in the document.
c. Risks relating to the strategy, policy, or plan have, as appropriate, been included in Service or Project Risk Registers and will be managed and subject to
monitoring and review in accordance with the council’s Risk Management Strategy. 
Note, there is a template which should be used to assess risks within the context of the topic of the particular strategy, policy, or plan.  This will assist with the
formulation of risks to be highlighted in the strategy, policy, or plan and where they will be managed.  This template is available on InsideNL. 
For any queries, please refer to the contact details for the Risk Team and Service Risk Champion available on InsideNL. 
(9) Armed Forces Covenant - The Covenant Duty is a legal obligation on certain public bodies to have due regard to the principles of the Covenant.  It requires
decisions about the development and delivery of certain services to be made with conscious consideration of the needs of the Armed Forces community.   
The Armed Forces Covenant Duty is based upon two key principles:
• The Armed Forces community should not face disadvantage compared to other citizens in the provision of public and commercial services.
• Special consideration is appropriate in some cases, especially for those who have given most, such as the injured and the bereaved. 
This legal obligation impacts organisations that are responsible for delivering principally statutory functions in healthcare, education, and housing services. The
Armed Forces community (particularly those who have given the most - which includes in-Service and ex-Service personnel, their families, and widow(er)s) will be
affected as beneficiaries of the Duty. 
When developing a strategy, policy, or plan due regard should be made to the Armed Forces Covenant Duty (i.e. does it relate to healthcare, housing, or education
services for in-Service or ex-Service personnel, or their families, or widow(er)s)? 
If so, then the provision which has been made should be recorded to ensure there has been appropriate consideration of the particular needs of the Armed Forces
Page 214 of 326

Page 215

19 
community to make sure they do not face disadvantage compared to other citizens in the provision of public services. 
(10) United Nations Convention on the Rights of the Child (UNCRC) - The United Nations Convention on the Rights of the Child (Incorporation) (Scotland) Bill was
passed by the Scottish Parliament on 16 March 2021 and work is currently underway to incorporate this into Scots Law to deliver improved outcomes for children and
young people.  Guidance issued by Scottish Ministers introduces children’s rights and the United Nations Convention on the Rights of the Child (UNCRC) to all those
undertaking public functions - not only those in children’s services - to give effect to children’s rights as set out in the UNCRC.   
Children’s rights are not just relevant to children and young persons’ services. All decisions made about - and actions taken to deliver - public services may impact on
the rights and wellbeing of children and young people. Those delivering public services should respect human rights when they make decisions, plan services, and
make policies. Every child has rights “without discrimination of any kind, irrespective of the child’s or his or her parent’s or legal guardian’s race, colour, sex,
language, religion, political or other opinion, national, ethnic or social origin, property, disability, birth or other status”. 
The UNCRC has 54 Articles that cover all aspects of a child’s life and set out the civil, political, economic, social, and cultural rights that all children in the UK are
entitled to. It also explains how adults and governments must work together to make sure all children can enjoy all their rights. The Convention must be seen as a
whole: all the rights are linked, and no right is more important than another. All UNCRC rights are underpinned by four general principles: 
• Non-discrimination.
• The best interests of the child.
• The right to life, survival, and development.
• The child’s right to have their views given due weight. 
Children’s individual rights sit alongside additional rights for specific groups of children, such as disabled children, children who have been exploited or mistreated,
refugee and migrant children, children in custody, and children in care. 
Note, there are four screening questions and a template which should be used to assess the impact in of a strategy, policy, or plan in this respect.  This assessment
should be carried out in the development process for all new (or updates to existing) strategies, policies, or plans.  This template is available on InsideNL. 
Trauma informed practice
Trauma informed approaches are in operation in the council in line with the national trauma framework. This recognises that trauma can affect individuals, groups, and
communities.  Trauma results from an event, series of events, or set of circumstances that is experienced by an individual as harmful or life threatening. While unique to
the individual, generally the experience of trauma can cause lasting adverse effects, limiting the ability to function and achieve mental, physical, social, emotional, or
spiritual wellbeing. 
Trauma informed practice is an approach used at present by a range of organisations (including for health and care interventions) and it aims to increase awareness of
how trauma can negatively impact on individuals and communities, and their ability to feel safe or develop trusting relationships with services and staff.  It aims to improve
the accessibility and quality of services by creating culturally sensitive, safe services that people trust and want to use. It seeks to prepare practitioners to work in
collaboration and partnership with people and empower them to make choices about their health and wellbeing.  Trauma-informed practice acknowledges the need to see
beyond an individual’s presenting behaviours and to ask What does this person need? rather than What is wrong with this person? 
There are six principles of trauma-informed practice: safety, trust, choice, collaboration, empowerment, and cultural consideration. 
An overview can be found in the following video ( https://vimeo.com/274703693 ), and further information is available on the following website, this includes help in
developing trauma-informed policies, systems, and practices: https://transformingpsychologicaltrauma.scot/ which should be taken into consideration in the development
of new (or updates to existing) council strategies, policies, or plans. 
(iv) Procurement considerations
Procurement contracts can sometimes require the council’s strategies, policies, and plans to be reflected.  There is no set list for such purposes as each procurement will
Page 215 of 326

Page 216

20 
require to consider which of the council’s strategies, policies, and plans are most applicable to that which is being procured.  The Strategic Policy Framework hierarchy
diagram on page 10 of this document provides a useful starting point (as does the council’s website) but this will require to be considered within the context of the
supplies, works, or services being procured. 
(v) Fraud and corruption risks
Where applicable, the development of strategies, policies, and plans should also consider any alignment required with the council’s Counter Fraud Policy and the need for
any subsequent actions to be implemented as a result of these considerations.  This aims to ensure that the council continues to adopt a response that is appropriate for
its fraud and corruption risks and is committed to maintaining its vigilance to tackle fraud.  Having up to date policies supports the council being able to demonstrate the
existence of effective anti-fraud arrangements.
2. Gather evidence and draft
(i) Gather evidence
The council requires strategies, policies, and plans that respond to the needs of local people and communities and contribute positively towards delivery of the shared
ambition for the area, as set out in The Plan for North Lanarkshire.  Meeting the Best Value duty of continuous improvement requires an approach to policy setting that is
informed by evidence that draws on research, evaluation, and data trends.   
Many types of evidence can inform policy development; this can take the form of evaluations that determine the effectiveness of interventions or policies, studies that
collect the views of people about the acceptability of a policy or intervention, people’s views on their needs or requirements, and descriptions of how or whether current
policies are being implemented. The views of stakeholders are essential in formulating and reviewing strategies, policies, and plans. 
The council website contains a general set of data regarding the people of North Lanarkshire: https://www.northlanarkshire.gov.uk/your-council/facts-and-figures - this
includes information on population, households, employment, and deprivation and is updated as new data becomes available.   
The Strategic Performance Framework supporting The Plan for North Lanarkshire contains a set of 28 Health Check Indicators which are high-level context indicators about
the place that is North Lanarkshire; these results are reported to the Policy and Strategy Committee annually each March.   
(ii) Identify outcomes
The Community Empowerment (Scotland) Act 2015 puts an outcomes approach to public services on a statutory footing.  Audit Scotland, in its briefing paper Planning for
Outcomes ( https://www.audit-scotland.gov.uk/report/planning-for-outcomes ) states that intentions, measurement, and evidence supporting outcomes should be
considered early in planning processes.   
Within this briefing note, it is recommended that “new policies, strategies or plans should set out the outcomes they are aiming to achieve and the intermediate outputs,
measures and milestones. Aligning activities with outcomes involves considering what a proposed new strategy is aiming to achieve at the outset and being clear what
success will look like.” 
(iii) Draft the document
Design process
A suite of templates have been developed by Corporate Communications for authors / content managers to use in the development process; the level 3 templates are
available on InsideNL.  The use of these templates aligns to the levels in the Strategic Policy Framework hierarchy (as depicted in Figure 2. on page 10 under reference to
parts (a), (b), (c), and (d).   
• Organisational level strategies or plans (level 02) - for either (a) council or (b) partnership - the full version of these documents will be produced by Brand and
Creative in Corporate Communications in either portrait or landscape layout using the corporate brand.  Note that some of the partnership plans may be produced
externally to the council and will not follow this standard, but should have the corporate North Lanarkshire branding and descriptor where possible.  Please ensure
Page 216 of 326

Page 217

21 
the time to design a document is built into the development process.  Note also that the full approved copy should be supplied to Brand and Creative as an
unformatted word document.
• Operational strategies, policies, or plans (level 03) - which refer to (c) practices across service specific activities.  A general policy / plan template produced by
Brand and Creative (in either portrait or landscape layout) - with the relevant live, learn, work, invest, and visit brand descriptor (e.g. LIVE HERE) - requires to be
used when drafting operational strategies, policies, and plans. This template can be found on InsideNL and can be used by all staff as appropriate. Documents used
in this way do not need to be designed by Corporate Communications. 
• Operational strategies, policies, or plans (level 03) - which refer to (d) matters in respect of service specific cross council activity.  The Basic template produced
by Brand and Creative (in either portrait or landscape layout) - with full brand stack: live, learn, work, invest, visit applied but relevant brand descriptor in bold -
requires to be used when drafting operational strategies, policies, and plans. This template can be found on InsideNL and can be used by all staff as appropriate.
Documents used in this way do not need to be designed by Corporate Communications. 
Drafting
Strategies, policies, and plans require to be written in clear and concise language that is easily understood by all.  A One Way of Reporting booklet has been developed
by Corporate Communications - this style guide provides guidance for those who have to put something in writing on behalf of the council.  This can be anything from a
letter, leaflet, strategy document, or news release to a committee report.  This is available on InsideNL. 
Some tips include:
1. Minimise the use of jargon, technical language, and acronyms.  When this is unavoidable, these must be explained or stated in full and where essential a glossary of
terms should be included.  Please remember that not everyone who reads the strategy, policy, or plan will be a subject matter expert.
2. Avoid using text that may become out of date quickly.
3. Make best use of headings, bulleted lists, and tables to break up rows and rows of text.
4. Vary sentence lengths - include long and short sentences; long sentences should be no more than 15 - 20 words.
5. Remember that strategies, policies, and plans should be written in the third person, e.g. “the council” (not in the first person, e.g. “I” or “us” or “you” or “our”).
6. Don’t use double negatives - they can often be confusing to the reader.
7. Don’t repeat the same message in several different paragraphs unnecessarily.
8. Remember that only proper nouns get a capital letter.
9. Remember to do a proofread - include grammar and spell checks and make sure there is consistency in font, style, and formatting.
10. Don’t use the passive voice in writing, e.g. “it will be sold by the council”.  The active voice should be used, e.g. “the council will sell it”. 
(iv) Complete the mandatory sections 
The document control section of all strategy, policy, and plan documents developed or updated in line with the Strategic Policy Framework must be completed by the
author / content manager irrespective of whether the document is produced by Corporate Communications or not.  This is a central record of the basic information relating
to the strategy, policy, or plan and is important in the development process in terms of identifying what changes have been made and when, the extent of stakeholder
consultation, and the approvals and governance processes.   
The author / content manager must ensure this section is completed accurately, remembering to set a review date for the next update of the document. 
Guidelines for each of the mandatory sections is provided below:
Document control
Title title of the document
Owner chief officer name and title Contact owner e-mail address
Governance group name of council committee (and/or partnership body) responsible for approving new strategic or policies in this respect (or significant changes), in
line with the Scheme of Administration and committee terms of reference therein
Page 217 of 326

Page 218

22 
Author author name and title Contact author e-mail address 
Revision history
Number Originator Date review commenced Revision description / record of change
1.0 name of person who initiated
the change
date development work
commenced (month and year,
e.g. June 2021)
short description of the reason for the revised version and/or a record of the
change made
2.0   
3.0   
etc   
Document approvals
Number Governance group Date approval granted Date approval to be requested
(if document still draft)
1.0 name of council committee (and/or partnership body) that
approved the new or changed strategy or policy 
date of meeting that approval was
granted (month and year, e.g.
September 2021)
when document is still in draft and has
not yet been approved insert date of
meeting that the final version is
expected to be presented to for
approval
2.0   
3.0   
etc   
Consultation record (for most recent update)
Status of document consulted upon state title of document and if the document is still in a draft format or if it is a final version
Stakeholders consulted / date  name(s) of stakeholders consulted and date (month and year) 
Strategic alignment 
Next review commencement date 
This section should highlight the alignment of the strategy, policy, or plan to The Plan for North Lanarkshire.  
Please state the relevant (a) priority and (b) ambition statement(s) that are most relevant to the document. 
Review date date when the next review will commence (not
the date it will be reported upon conclusion of
the review)
3. Consult with relevant stakeholders
(i) Identify stakeholders
Page 218 of 326

Page 219

23 
As well as providing evidence to assist in the policy formulation and development processes, stakeholders’ views must be sought before final committee approval with
sufficient time allowed for meaningful consideration.  New or refreshed strategies and policies are subject to a minimum consultation period of 21 working days. 
The report author / content manager should identify all interested parties and ensure appropriate engagement with, for example: 
- other council services    -  specific communities or community groups
- employees      -  all North Lanarkshire residents
- elected members     -  partner organisations
- trade unions      -  other public bodies
- specific service users     -  others, as required 
(ii) Tools and techniques
In terms of public consultation, the council’s website has a section dedicated for this purpose ( https://www.northlanarkshire.gov.uk/your-community/working-
communities/consultations ). This section should be used - along with other methods as appropriate - when draft strategies, policies, or plans require feedback from the
public as part of the development process. 
(iii) Consultation record
As part of the consultation process, the report author / content manager should ensure the mandatory document control section is completed in this respect.
4. Get strategic oversight and approval
(i) Obtain committee approval
The role of Elected Members is set out on page 11 of this document (as per the Standards Commission for Scotland Advice Note).  This makes it clear that the role of
Members is to “determine policy”.  All new (or significant changes to existing) strategies, policies, and plans within the Strategic Policy Framework must therefore be
approved at the relevant committee. 
The business to be transacted at committees, the arrangements for committee meetings, and the functions delegated to committees are regulated in accordance with the
Scheme of Administration.  The Scheme of Administration therefore sets out the terms of reference for committees and, as such, should be consulted to ensure the new
(or updated) strategy, policy, or plan is submitted to the relevant committee for approval.  The Scheme of Administration is published on the council’s committee system. 
(ii) Ensure strategic oversight
The Standards Commission for Scotland Advice Note (see page 11) also sets out the responsibility of the Chief Executive and senior employees to help ensure that the
policies of the council are implemented. 
Strategy, policy, plan owners (i.e. Chief Officers) are therefore responsible for ensuring a final review of the strategies, policies, and plans within the Strategic Policy
Framework prior to strategic oversight by the Corporate Management Team (CMT) and committee approval thereafter. 
Chief Officers are also responsible for ensuring appropriate CMT oversight in line with the CMTs terms of reference to ensure strategic oversight of the corporate
strategies, policies, and plans developed by the council and input into the development of such prior to submission to Committee for formal approval. 
(iii) C paragraphs
A paragraph within a committee Minute designated with the letter 'C' denotes that the item is subject to consideration by the Council meeting. All other items have been
delegated in terms of the approved Scheme of Administration and will therefore be submitted for information only.  This often relates to a decision regarding approval of a
new strategy or policy (or a significant change to either) that has previously been approved by a specific committee; in these instances paragraph 22 of the council’s
Standing Orders for meetings apply and approval is therefore also required at the Council meeting.  The process for defining ‘C’ paragraphs is undertaken by Committee
Page 219 of 326

Page 220

24 
Services staff.
5. Communicate and implement
(i) Communication
It is essential that all stakeholders are aware of the existence of council strategies, policies, and plans that are relevant to them.
For these to be effective, owners must ensure appropriate communication takes place at each relevant stage in the process.  Such communication should: 
• Take place at the stakeholder engagement process in the development of the strategy, policy, or plan.
• Use the council’s consultation web page, should public feedback be required ( https://www.northlanarkshire.gov.uk/your-community/working-
communities/consultations )
• Involve staff who currently apply the policy and may need to make alterations to day-to-day operations in order to implement a new or changed policy.
• Consider if there is a role for the Community Boards in any public consultation exercise to ensure local community groups can be fully engaged with, if so please
involve the Community Partnership team.
• Ensure engagement with service users who are affected by the change(s).
• Ensure that, where necessary, education or training is provided to put the requirements of the strategy, policy, or plan into effect.
• Involve the distribution of the strategy, policy, or plan following the formal approval process. 
When identifying all aspects of communication required for the strategy, policy, or plan following formal approval at committee, the following should also be considered: 
• If the strategy, policy, or plan is controversial.
• If the strategy, policy, or plan requires public promotion of something.
• If the strategy, policy, or plan means a change in the way the service is delivered that will impact on service users or residents, or that requires people accessing the
service to behave in a different way.
• If the strategy, policy, or plan means a reduction or cessation of service.
• If the strategy, policy, or plan means any change for employees in other services. 
If any of these apply, please liaise with colleagues in Corporate Communications so that they are aware of any potential reputational risks and can design appropriate,
timely communications activity. 
(ii)  Implementation
Getting policy implementation right is critically important. Failure to do so can have a financial impact and cause disruption for local residents and service users.  The
owner should ensure that there is a plan for implementation and communication that is developed - and agreed by the relevant individuals or bodies - in advance.
6. Monitor and review
(i) Monitor
Strategies and policies should be regularly evaluated to determine how well they are working and ensure they are achieving their desired aim. 
Obtaining public or service user feedback, establishing a suite of performance measures, carrying out a self-evaluation exercise, or undertaking a cost-benefit analysis are
some examples of ways to evaluate the effectiveness of a strategy, policy, or plan.  For further information regarding performance measures or self-evaluation please e-
mail StrategyAndPerformance@northlan.gov.uk 
(ii) Review
It is essential that each item within the Strategic Policy Framework is kept on a Review Programme so that it remains up to date and is reported to the relevant committee. 
Page 220 of 326

Page 221

25 
While regular monitoring and review processes are important to ensure strategies, policies, and plans remain fit for purpose and continue to align to the long-term vision of
the council, this needs to be proportionate to the resources expended, outcomes expected, and the associated risks. 
Some review and update timescales are set by statute, or by national or partner organisations, but in principle all strategies, policies, and plans within the Strategic Policy
Framework should be reviewed and updated within a minimum of five years. 
As part of the review process for existing documents, the respective strategy, policy, or plan document should follow the same stakeholder engagement and strategic
oversight process as new documents.   
(iii) Approvals
Significant amendments to an existing strategy, policy, or plan document must be approved at the relevant committee.  
• A significant amendment is a change to the purpose or scope, or to the content, or to the responsibilities for implementing a strategy, policy, or plan.  
• Minor amendments are changes that do not affect the general meaning, scope, purpose, or intent of the strategy, policy, or plan.
7. Publish
Once formal approval has been provided by the relevant committee, all corporate level strategies or plans should be published on the council’s website: 
https://www.northlanarkshire.gov.uk/your-council/council-strategies-and-plans/council-strategies 
The author / content manager is responsible for publishing the new or updated strategy, policy, or plan document on the council’s website.  They are also responsible for
ensuring that documents published comply with accessibility requirements for public sector bodies, the council’s corporate branding guidelines, and that the relevant key
words are used to ensure search functions can easily locate a strategy, policy, or plan. 
Page 221 of 326

Page 222

26 
Appendix B:  Review programme 
The following provides an indicative timetable (as at January 2024) outlining when a new (or updated) strategy, policy, or plan will be reported to the respective committee following completion of the review and update process.  It should be
noted that this Review Programme only refers to substantial updates to the respective strategy, policy, or plan document which are required to reiterate the intent halfway through the lifespan of the document for example, or because the
document has reached the end of its life. It does not capture supporting action plans which are reviewed, updated, and reported annually through other means. 
The timescale between the date the review is scheduled to take place and approval at committee may vary depending on the extent of the review and engagement process that requires to be undertaken for a specific strategy, policy, or
plan.  As a rule of thumb all updated strategies, policies, and plans require to be presented to the relevant committee within three months of the conclusion of the review process. 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of
document / 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2024
Cycle 2
Apr - Jun
2024
Cycle 3
Aug - Sept
2024
Cycle 4
Oct - Dec
2024
Cycle 1
Jan - Mar
2025
2025/26 2026/27
The Plan for North Lanarkshire
The Plan for North Lanarkshire sets the long-term
strategic direction for the council, partners, and other
stakeholders and, most importantly, for each unique
local community and the people who live, learn, work,
invest, and visit within North Lanarkshire.  It’s a Plan
with a shared ambition of inclusive growth and
prosperity for all and a fairer distribution of wealth
across all local communities.
28-02-19
The Plan for North
Lanarkshire 
link to report
link to strategy document 
Strategy has no
timeframe.  The
Programme of Work
provides the delivery and
review mechanism, and
this is reviewed annually.       
Chief Executive Policy and
Strategy
Committee
Financial Strategy
As the overarching framework that establishes the
financial strategies and policies which ensure
effective financial governance, planning, and
management, this sets out the responsibility for
safeguarding public funds within North Lanarkshire
Council and the role of the Section 95 Officer.  
The financial strategies and policies covered by the
Financial Strategy are the Capital Strategy, Treasury
Management Strategy, Revenue Resources Budget
Strategy, Medium-Term Financial Plan, and the
Financial Regulations and Scheme of Financial
Delegation. All have an annual review frequency and
are monitored within the Strategic Governance
Framework annual Review Programme.
06-06-19
Financial Strategy
link to strategy 
Strategy has no
timeframe.  Following a
review in August 2022, the
Corporate Management
Team concluded the
Strategy remains relevant
in its current form and no
further update was
required.       
Chief Officer
(Finance)
Policy and
Strategy
Committee
Corporate Communications Strategy
The overarching Communications Strategy covers
the whole organisation and aims to ensure that
communication activity closely aligns with delivery of
The Plan for North Lanarkshire.  All major activity
must support an ambition statement and align with
the core narrative which supports the live, learn,
work, invest, and visit brand strategy. 
In order to maximise communication support for the
council’s priorities and ambitions, the
Communications Strategy sets out the key strategic
principles of council communication. 
06-06-19
Corporate
Communications Strategy
link to strategy
Update to the strategy
scheduled for committee in
cycle 2 of 2024. 
X      Chief Officer 
(Strategic
Communication
and
Engagement)
Policy and
Strategy
Committee
Equality Strategy
The Equality Strategy sets out the council’s
commitment to equality and human rights and its
clear understanding of the disadvantage and
inequality that exists for some people and
communities. Through five working objectives for
26-08-19
Equality Strategy 2019-24
link to strategy 
The strategy will be fully
reviewed in early 2024 and
will incorporate a
refreshed set of equality
outcomes for the council  
X   X X Chief Officer
(People
Resources)
Wellbeing and
Tackling Poverty
Committee
Page 222 of 326

Page 223

27 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of
document / 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2024
Cycle 2
Apr - Jun
2024
Cycle 3
Aug - Sept
2024
Cycle 4
Oct - Dec
2024
Cycle 1
Jan - Mar
2025
2025/26 2026/27
success, the strategy outlines how equality will
continue to be part of the everyday work of the
council thereby ensuring a mainstreamed approach.
with yearly updates
thereafter; update
scheduled for committee in
cycle 3 of 2024.  
Workforce for the Future Strategy
The Workforce for the Future Strategy approved in
March 2020 covers the period 2020-23.   This
strategy was subsequently refreshed in June 2021
and realigned in light of the pandemic as it continued
to have a major impact on levels of employment and
the needs of employers across North Lanarkshire. It
also addressed the issue that the pandemic was
expected to have adversely affected the wider
employment, training, and progression prospects of
young people and other residents who have been
made redundant or may be at risk.
03-06-21
Workforce for the Future
Strategy
link to strategy
Going forward the
objectives and ongoing
activities supporting this
strategy will be subsumed
within the Brighter Futures
programme, aligned to the
council’s overall
Programme of Work.       
Chief Officer
(People
Resources)
Policy and
Strategy
Committee
Workforce Mental Health and Wellbeing Strategy
The council recognises that mental ill health and
stress can be associated with many of the leading
causes of disease and disability in society. Promoting
and protecting the mental wellbeing of the workforce
is important for individuals’ physical health, social
wellbeing, and productivity. Mental wellbeing in the
workplace is relevant to all employees and everyone
can contribute to improved mental wellbeing at work.
27-05-21
Mental Health and
Wellbeing Strategy
link to strategy
An update on the strategy
progress and goals to
2028, including the work of
service Mental Health
groups, is scheduled for
committee in cycle 2 of
2024. 
X    X X Chief Officer
(People
Resources)
Finance and
Resources
Committee /
Wellbeing and
Tackling Poverty
Committee
Procurement Strategy
In order to demonstrate Best Value, local authorities
are required to comply with legal and best practice
requirements in the procurement and strategic
commissioning of goods, services, and works
(including the Scottish Model of Procurement) and
ensure there is clear accountability within
procurement and commissioning arrangements.
The Procurement Reform (Scotland) Act 2014
requires Scottish public bodies with annual
procurement spend greater than £5 million (which
includes the council) to develop and publish an
organisational procurement strategy and keep the
strategy under regular review.
14-09-22
Procurement Strategy
2023-24
link to strategy
This one-year strategy is
reviewed and updated
annually.  Next update is
scheduled for committee in
cycle 1 of 2024.
X     X X Chief Officer
(Assets and
Procurement)
Finance and
Resources
Committee
Digital and IT Strategy
IT and digital are integral to the future success of The
Plan for North Lanarkshire, and the Digital and IT
Strategy highlights how technology will be used to
transform service delivery and deliver on the vision
for a Digital North Lanarkshire with Digital
Communities, a Digital Economy, and a Digital
Council.
The strategies and policies covered by the Digital and
IT Strategy are the Acceptable Use of ICT Policy,
Data Protection Policy, Information Security Policy,
Payment Care Industry Data Security Policy, Records
and Information Management Policy, and Records
23-02-22
Digital and IT Strategy
link to strategy 
Strategy scheduled to be
reviewed and updated
when it reaches the end of
its current life in 2023/24,
with a new strategy for
2024 to 2027 scheduled
for committee in cycle 1 of
2024.
X      X Chief Officer
(Business and
Digital)
Policy and
Strategy
Committee
Page 223 of 326

Page 224

28 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of
document / 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2024
Cycle 2
Apr - Jun
2024
Cycle 3
Aug - Sept
2024
Cycle 4
Oct - Dec
2024
Cycle 1
Jan - Mar
2025
2025/26 2026/27
Management Plan.
The strategies and policies covered by the Digital and
IT Strategy are set out therein along with timescales
for further review.  All have a regular review
frequency and are monitored within the Strategic
Governance Framework annual Review Programme.
Risk Management Strategy
The Risk Management Strategy sets out a clear
direction for how the council will identify, assess, and
manage the risks faced in providing high quality
public services and delivering The Plan for North
Lanarkshire.  The strategy is intended to ensure that
the council is risk aware rather than risk averse and
that the management of risk is embedded in the
council’s policies, procedures, culture, and practices.
It is designed to ensure key decisions are taken with
an understanding of risks and their effective control.
Risk management arrangements form an important
element of good corporate governance and are
designed to ensure that the council operates
systematic and logical processes for managing risks
within a comprehensive framework, ensuring that
identified risks are managed consistently, effectively,
efficiently, and coherently across the organisation. 
16-03-23
Risk Management
Strategy 2023-26 
link to strategy
3 year strategy next
scheduled to be reviewed
in December 2025 and
reported to committee in
cycle 1 of 2026.     
X  Chief Officer
(Audit and Risk)
Policy and
Strategy
Committee
Internal Audit Strategy
The Internal Audit Strategy is designed to clearly set
out Internal Audit’s strategic objectives and outline
briefly in clear and concise terms how these strategic
objectives will be delivered. It is considered that such
a statement benefits both key stakeholders and
Internal Audit staff, by providing a clear overview of
what Internal Audit is trying to achieve, and how, and
by establishing key principles against which the
performance of Internal Audit can be better assessed.
27-06-19
Internal Audit Strategy
2019/20 - 2021/22
link to strategy 
Strategy scheduled to be
reviewed and updated and
reported to committee in
cycle 2 of 2024. 
X      Chief Officer
(Audit and Risk)
Audit and
Scrutiny Panel
Counter Fraud Policy
North Lanarkshire Council has a zero-tolerance
approach to fraud, bribery, and corruption, and aims
to design, implement, and operate effective systems
to counter these.  The Counter Fraud Policy details
the council’s approach to the prevention, detection,
and investigation of fraud across all service areas.
28-09-23
Counter Fraud Policy
link to policy 
Policy next scheduled to
be reviewed in October
2025 and reported to
committee in cycle 1 of
2026.     
X  Chief Officer
(Audit and Risk)
Audit and
Scrutiny Panel
Events Strategy
The council has an extensive history of hosting and
promoting successful events. Events contribute to the
local economy through tourism and expenditure in the
local area and via the supply chain. They provide
recreational and volunteering opportunities for local
people and, at their biggest, give North Lanarkshire a
national and international profile. While the council
has staged many successful events, a formal Events
Strategy ensures the council, working with its
partners, maximises the potential of North
06-06-19
Events Strategy
link to strategy
Strategy has no
timeframe. 
Chief Officer 
(Strategic
Communication
and
Engagement)
Policy and
Strategy
Committee
Page 224 of 326

Page 225

29 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of
document / 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2024
Cycle 2
Apr - Jun
2024
Cycle 3
Aug - Sept
2024
Cycle 4
Oct - Dec
2024
Cycle 1
Jan - Mar
2025
2025/26 2026/27
Lanarkshire as a destination of choice for hosting
events.
Diet and Nutrition Policy
Improving the health and wellbeing of local
communities is a key aspect to achieve the five
priorities in The Plan for North Lanarkshire in order to
empower people to make healthier choices and
improve their health and wellbeing. This policy
demonstrates the council’s commitment to improving
the diet and nutrition of its service users, residents,
and staff. In 2000, the council was one of the first
local authorities in Scotland to develop a policy in
relation to diet and nutrition which was subsequently
updated after a significant number of developments
were made both nationally and locally to tackle
Scotland’s high levels of overweight and obesity.
An update is required to reflect Natasha’s Law,
Nutritional Requirements for Food and Drink in
Schools (Scotland) regulations 2020, and the Good
Food Nation (Scotland) Act 2022.  Other items to be
considered will be the Deposit Return Scheme and
Setting the Table guidelines which are under review.
19-03-20
Diet and Nutrition Policy
2019-24 
link to policy
5-year policy next
scheduled to be reviewed
and updated and reported
to committee in cycle 4 of
2024. 
X    Chief Officer
(Community
Operations) 
Policy and
Strategy
Committee
Climate Plan, Action on Climate Together
The Climate Plan is the first of an intended series of
climate-related documents that encompass the
council’s own climate emergency declaration and
subsequent target of net-zero emissions. The climate
plan provides targets from 2021/22 to 2025/26 with a
commitment to continually review and set targets
beyond this.
09-02-22
Climate Plan, Action on
Climate Together
link to plan
The Climate Plan is up to
2030, however carbon
budgets are set to 2025/26
so an update is scheduled
for committee in cycle 1 of
2024 and annually
thereafter to ensure
ongoing alignment with the
Programme of Work. 
There is a requirement to
deliver an Adaptation Plan;
this will be scheduled for
committee in cycle 1 of
2025.
X    X   Chief Officer
(Assets and
Procurement)
Environment and
Climate Change
Committee
Local Heat and Energy Efficiency Strategy (LHEES) and Delivery Plan
The Local Heat and Energy Efficiency Strategies
(Scotland) Order 2022 (SSI 171) placed a duty on
local authorities to produce a LHEES and a
supporting 5-year cycle Delivery Plan by 31
December 2023. 
The purpose of a LHEES is to provide a framework
for taking an area-based approach to heat and
energy efficiency planning and delivery (i.e. it does
not include wider energy planning).  The framework
therefore aims to:
• Set out how each segment of the building stock
needs to change to meet national objectives,
including achieving zero greenhouse gas
emissions in the building sector, and the removal of
07-12-23
Loal Heat and Energy
Efficiency Strategy and
Delivery Plan
link to strategy and plan
The LHEES is a 20-year
strategy which is
supported by a 5-year
Delivery Plan. 
Report scheduled for
committee in cycle 3 of
2024 will include feedback
from the Scottish
Government. 
X     Chief Officer
(Assets and
Procurement) /
Chief Officer
(Housing
Management)
Policy and
Strategy
Committee
Page 225 of 326

Page 226

30 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of
document / 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2024
Cycle 2
Apr - Jun
2024
Cycle 3
Aug - Sept
2024
Cycle 4
Oct - Dec
2024
Cycle 1
Jan - Mar
2025
2025/26 2026/27
poor energy efficiency as a driver of fuel poverty.
• Identify areas where there is potential for heat
networks and set out the primary measures for
reducing emissions.
• Prioritise areas for delivery, against national and
local priorities.
Corporate Asset Management Plan
The Corporate Asset Management Plan (CAMP)
provides an overview of how the council is managing
its assets in alignment with the strategic direction of
the organisation to both deliver and sustain an asset
base that will meet current and future requirements.
The CAMP is one of the tools used to manage the
asset base and guide activities (i.e. maintain,
rationalise, invest, dis-invest); it links into the ongoing
review and development of the 5-year capital plan.
14-09-22
Corporate Asset
Management Plan (CAMP)
2021-26
link to plan
5-year plan next
scheduled to be reviewed
and updated and reported
to committee in cycle 1 of
2026. 
X  Chief Officer
(Assets and
Procurement)
Finance and
Resources
Committee
Housing Asset Management Plan
The council’s Housing Asset Management Plan
(HAMP) 2021-26 provides an overview of Homes Fit
for the Future.  
It aligns with the Local Housing Strategy and other
council strategies and provides the strategic
framework for asset management activities and
investment over the next five years.  There are four
key priorities to guide activities:
• Help deliver the homes North Lanarkshire needs to
grow.
• Provide high-quality, well-maintained homes.
• Tackle climate change and fuel poverty.
• Improve council systems and use of data.
17-02-21
Housing Asset
Management Plan 2021-26
link to plan
5-year plan next
scheduled to be reviewed
and updated and reported
to committee in cycle 1 of
2026. 
X  Chief Officer
(Housing
Management)
Housing
Committee
Community Safety Strategy
The Community Safety Strategy recognises that
community safety is set within a broad context of
enabling communities to be resilient and safe,
through effective engagement and empowerment,
and that much wider social, economic, and physical
factors all impact on community safety.
This strategy aims to ensure a holistic, integrated
approach across partners to address the needs of
communities in North Lanarkshire, recognising the
broad spectrum of activity that contributes to
community safety. The strategy also comprises the
Antisocial Behaviour Strategy for North Lanarkshire
as required by the Antisocial Behaviour etc.
(Scotland) Act 2004 due to the inter-connectedness
of tackling antisocial behaviour with the other
community safety strands and benefits of considering
all of these strands together to better use and target
resources and activity as a partnership.
01-02-21
Improving Community
Safety in North
Lanarkshire: A Strategy to
Improve Lives 2020-25
link to strategy 
5-year strategy next
scheduled to be reviewed
and updated when it
reaches the end of its
current life; update
scheduled for committee in
cycle 2 of 2025.   
X  Chief Officer
(Strategic
Communication
and
Engagement)
Communities
Committee
Community Matters - a Framework for Working with Communities
The Working with Communities Framework has been
developed to guide engagement approaches to
26-08-19
Community Matters - a
Review / update will be
undertaken in 2024 in line   
X    Chief Officer
(Strategic
Communities
Committee
Page 226 of 326

Page 227

31 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of
document / 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2024
Cycle 2
Apr - Jun
2024
Cycle 3
Aug - Sept
2024
Cycle 4
Oct - Dec
2024
Cycle 1
Jan - Mar
2025
2025/26 2026/27
ensure a more streamlined approach to community
participation and empowerment. This reflects not just
the strategic context for the council and Community
Planning Partnership but also the requirements of key
national drivers for community empowerment,
including the Principles for Community Empowerment
published by Audit Scotland.
Framework for Working
with Communities 
link to framework
with the Partnership
Communications Strategy
and implementation of the
findings from the 
Community Planning /
Community Boards self-
evaluation exercise
undertaken in 2023.
Communication
and
Engagement)
Environment Pathway
The council has a number of strategies, action plans,
and policies which contribute to the development and
protection of North Lanarkshire’s environment. The
reconfiguration of the Environment Strategy into an
Environment Pathway aligns all of these under one
strategic approach to ensure these related strategies,
policies, and plans are not implemented in isolation,
but take account of common environmental factors
locally and collectively aim to protect, enhance, and
promote North Lanarkshire’s environment.
This document also comprises those strategies or
duties required by legislation.  It includes the Air
Quality Action Plan, Biodiversity Action Plan, Climate
Ready Clyde Adaptations Strategy, Contaminated
Land Strategy, Core Paths Plan, Food Growing
Strategy, Single Use Plastic Action Plan, and Tree
Asset Management and Operational Woodland Plan
and shows the alignment to the Active Travel
Strategy, Local Development Plan, Local Transport
Strategy, Climate Plan, and Open Space Strategy.
The strategies, policies, and plans covered by the
Environment Pathway are set out therein along with
timescales for further review. 
03-05-23
Environment Pathway
link to strategy
2-year strategy with next
review and update
scheduled for 2025;
update scheduled for
committee in cycle 2 of
2025.   
X  Chief Officer
(Community
Operations)
Environment and
Climate Change
Committee
Active Travel Strategy
This strategy puts in place for the first time, a
cohesive and holistic framework to prioritise and
accelerate active travel interventions across North
Lanarkshire. These will align with the Town Visions
and Town and Community Hub development to
provide better active travel networks between local
communities and across the local authority boundary.
This will also help to deliver improved health and
wellbeing and environmental, social inclusion, and
public access benefits.
25-08-21
Active Travel Strategy
2021-31 
link to strategy 
10-year strategy which will
be reviewed / updated
when it reaches the end of
its current life.       
Chief Officer
(Place)
Environment and
Climate Change
Committee
Local Transport Strategy
Robust transport networks play a significant part in
delivering the ambition to make North Lanarkshire the
place to live, learn, work, invest, and visit.
The Local Transport Strategy sets out how national
objectives are delivered at a local level. There are
four objectives within the strategy:
• To stimulate business and the economy and
develop North Lanarkshire as an attractive place to
invest, work, and do business.
Local Transport Strategy
link to strategy
Development of new
Strategy will be
progressed during 2024
for approval at committee
in cycle 2 of 2025. 
X  Chief Officer
(Place)
Environment and
Climate Change
Committee
Page 227 of 326

Page 228

32 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of
document / 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2024
Cycle 2
Apr - Jun
2024
Cycle 3
Aug - Sept
2024
Cycle 4
Oct - Dec
2024
Cycle 1
Jan - Mar
2025
2025/26 2026/27
• To provide equal opportunities and enhance the
choice, accessibility, and availability of transport,
particularly for those in deprived areas and those
with limited access to the transport network.
• To promote safety in the community and enhance
safety when travelling on the transport network.
• To protect North Lanarkshire's natural built
environment and to improve the health of the local
population.
Local Development Plan
The Local Development Plan (LDP) is the land use
planning strategy for North Lanarkshire. A strategy is
a plan of action designed to achieve a long term or
overall aim - the long-term aim is to increase
sustainable growth and regeneration, and to improve
places in support of the council’s long-term vision.
The Local Development Plan looks to achieve this
through policies used to determine applications for
planning permission.
30-06-22
North Lanarkshire Local
Development Plan Update
and Development Plan
Scheme 2023
link to file 
link to latest LDP 
Work will progress on the
new LDP during 2023/24
with anticipated approval
of Proposed LDP expected
2025/26.  Adoption of new
LDP thereafter expected in
2027/28.     
X  Chief Officer
(Place)
Full Council
Indicative Regional Spatial Strategy (RSS)
As part of the new Planning system and following
Parliamentary approval of NPF4, the Scottish
Government will invite regional groupings of Planning
Authorities to prepare a non-statutory Regional
Spatial Strategy. RSSs can identify areas for future
population growth, align with regional economic
strategies, and identify key sectors and clusters for
future development and investment along with
networks of regionally significant centres, growth, and
investment areas.
There will be no requirement for council approval of
this strategy; separate governance arrangements will
be in place regionally.  
This strategy is included here for completeness as
the Local Development Plan will be required to have
regard to it.
N/A National guidance has still
to be provided -
publication date has still to
be confirmed.  Currently
estimate adoption of RSS
in early 2026.     
X  Chief Officer
(Place)
N/A
Approved
through
governance
arrangements at
a regional level
Glasgow City Region Economic Strategy
The economic strategy for Glasgow City Region
(GCR) - launched in December 2021 - sets the
framework for GCR decision making and identifies
priorities and programmes for spend over the next ten
years for the region, impacting on 1.8 million
residents and 50,000 businesses.
The partnership approach is a first in that it has been
developed and endorsed not only by the region’s
eight councils but by government and wider public
sector agencies (including Scottish Enterprise and
Skills Development Scotland) all of which will be
instrumental in its delivery.
There will be no requirement for council approval of
this strategy; separate governance arrangements are
in place through the Glasgow City Region Cabinet.  
This strategy is included here for completeness as it
December 2021
Glasgow City Region
Economic Strategy
link to strategy 
August 2022
Regional Economic
Strategy Action Plan
2022/23
link to plan
10-year Strategy with
Action Plan.  
Strategy and action plan
reported quarterly to the
GCR and Action Plan
reviewed annually by the
GCR Project Management
Office.       
Chief Officer
(Place)
N/A
Approved
through Glasgow
City Region
Cabinet  
Page 228 of 326

Page 229

33 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of
document / 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2024
Cycle 2
Apr - Jun
2024
Cycle 3
Aug - Sept
2024
Cycle 4
Oct - Dec
2024
Cycle 1
Jan - Mar
2025
2025/26 2026/27
aligns to the City Deal programme. 
North Lanarkshire Tourism Strategy
This strategy sets out the aspirations for a shared
vision that by 2026 North Lanarkshire will be a
sustainable, resilient tourist destination offering a
range of authentic and memorable experiences which
provide value for money and are accessible to all.
The strategy captures current service provision and
supports the recovery and growth of the tourism and
leisure sector in North Lanarkshire. The Action Plan
sets out how the aims of the strategy will be met. The
Action Plan will be reviewed annually to ensure it
continues to achieve the vision outlined in the
Tourism Strategy in the short, medium, and long-
term.
03-02-22
Tourism Strategy and
Action Plan 2022-26
Link to file 
4-year strategy with an
action plan reviewed and
updated annually. 
Strategy will be reviewed
and updated in 2025/26
when it reaches the end of
its current life.     
X  Chief Officer
(Place)
Enterprise and
Fair Work
Committee
Economic Regeneration Delivery Plan (ERDP)
The ERDP is a high-level framework which is aligned
to the composite capital programme and delivers on
the priority of The Plan for North Lanarkshire to
improve economic outcomes and opportunities. This
will be achieved by delivering an integrated approach
to investing in four key inter-related areas: 
• Housing supply.
• Town centres.
• Business and industry.
• Infrastructure and coherently across the
organisation.
17-02-23
Economic Regeneration
Delivery Plan 2023-28
link to plan 
5-year strategy with an
action plan reviewed and
updated annually. 
Strategy will be reviewed
and updated in 2027/28
when it reaches the end of
its current life.       
Chief Officer
(Place)
Enterprise and
Fair Work
Committee
Business and Industry Strategy
The ERDP recognises that improving and extending
North Lanarkshire’s business and industrial offer is
essential to supporting economic growth. While work
is ongoing to support and enable the development of
North Lanarkshire’s key business locations, and
initiatives are being developed to assist with
improvements to existing estates, it has been
identified that there is a need to develop a more
strategic approach.  
This will be achieved through the establishment of a
cohesive Business and Industry Strategy which is
closely linked to work programmes for business
support and skills development.  This will ensure any
investment in business infrastructure can promote
both business growth and local employment
opportunities.
The Business and Industry Strategy will provide the
evidence base to help inform / prioritise future public
sector investment and inform the next Local
Development Plan in terms of employment land
allocation.
N/A Work is progressing on the
new Strategy for reporting
in cycle 1 of 2025.  This
will form part of the
evidence base for the new
Local Development Plan. 
X   Chief Officer
(Place)
Enterprise and
Fair Work
Committee
North Lanarkshire Social Enterprise Framework
This framework sets out the shared vision for a
competitive and dynamic Social Enterprise sector in
03-02-22
North Lanarkshire Social
4-year strategy with an
action plan reviewed and     
X  Chief Officer
(Place)
Enterprise and
Fair Work
Page 229 of 326

Page 230

34 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of
document / 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2024
Cycle 2
Apr - Jun
2024
Cycle 3
Aug - Sept
2024
Cycle 4
Oct - Dec
2024
Cycle 1
Jan - Mar
2025
2025/26 2026/27
North Lanarkshire which supports inclusive and green
growth, delivering innovative solutions and proactive
responses to local needs and maximising local public
and private procurement opportunities. It captures
current service provision and supports the recovery
and growth of the sector through three key themes:
stimulating the sector, developing stronger
organisations, and realising market opportunities. 
The Action Plan sets out how the aims of the
Framework will be met. The Action Plan will be
reviewed annually to ensure it continues to achieve
the vision outlined in the Framework in the short,
medium, and long-term.
Enterprise Framework
2022-26
link to framework 
updated annually. 
Strategy will be reviewed
and updated in 2025/26
when it reaches the end of
its current life.
Committee
Open Space Strategy
Open space strategies are a statutory requirement
under the provisions of the new Planning (Scotland)
Act 2019.  An Open Space Strategy will require a
strategic framework to be set out which comprises
the council’s policies and proposals regarding the
development, maintenance, and use of green
infrastructure (including open spaces and green
networks).  
The legislation requires that an open space strategy
is underpinned by an audit of existing open space
and play provision, an assessment of current and
future requirements, and any other matter the council
considers appropriate.
Guidance on the requirements of the open space
audit and open space strategy (linked to NPF4 and
guidance for the preparation of future Local
Development Plans) and Play Sufficiency
Assessments was published for consultation in late
2021 and has still to be finalised. Indicative
timescales are subject to change, but work is already
underway, in consultation and with the assistance of
Greenspace Scotland, to prepare for the audit and
provide a bank of local data.  This will be an
invaluable resource that can be used to inform the
council’s strategic direction.
The audit will then inform requirements for retention,
enhancement, replacement, re-purposing, or disposal
of a range of places, spaces, and connections. This
will allow for the combination of new and existing
networks to form an integrated network of connected
places and spaces across North Lanarkshire’s
communities.
16-03-23
Update 
link to report
Development of new
Strategy, including open
space audit, is currently
progressing.  Update is
scheduled for committee in
cycle 2 of 2024 and final
strategy is scheduled for
approval at committee in
cycle 4 of 2024. 
X   X     Chief Officer
(Place)
Policy and
Strategy
Committee
Strategic Activity Framework
Developed through the North Lanarkshire
Partnership, the Physical Activity and Sport Strategic
Framework puts North Lanarkshire in a great position
to help everyone become more active.  This
framework has set some ambitious targets to help
improve the health and increase the physical activity
24-08-20
ActiveNL - North
Lanarkshire’s Physical
Activity Strategic
Framework 2020-24
link to framework
5-year framework will be
reviewed / updated when it
reaches the end of its
current life.    
X   Chief Officer
(Community
Operations)
Communities
Committee
Page 230 of 326

Page 231

35 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of
document / 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2024
Cycle 2
Apr - Jun
2024
Cycle 3
Aug - Sept
2024
Cycle 4
Oct - Dec
2024
Cycle 1
Jan - Mar
2025
2025/26 2026/27
levels of all. The focus of the strategy and action plan
reflects the importance of cultural activity on overall
wellbeing.
Local Housing Strategy
The Housing (Scotland) Act 2001 places a statutory
requirement on local authorities to produce a Local
Housing Strategy (LHS) that sets out the strategy,
priorities, and plans for the delivery of housing and
related services. The 2001 Act states that the LHS
must be supported by an assessment of housing
provision including the need and demand for housing
and related services and that local authorities must
keep their LHS under review.  Nationally there is an
expectation that councils prepare and submit LHSs
every five years and there is a requirement to provide
a focus on housing supply, homelessness, property
condition, energy efficiency, fuel poverty, and older
people's and specialist provision housing.  
In North Lanarkshire, the Local Housing Strategy is at
the heart of arrangements for housing and planning
through its links with the Local Development Plan, as
well as its strategic role in directing investment in
housing and housing related services locally. It sets
out a strategic vision for the delivery of housing and
housing related services. 
24-11-21
Housing Strategy 2021-26
link to report 
link to strategy  
Five-year strategy, with an
annual review and
progress on the delivery of
the action plan reported to
committee annually. 
Strategy will be reviewed
and updated in 2026 when
it reaches the end of its
current life.      
X Chief Officer
(Housing
Management)
Housing
Committee
Tenant Participation Strategy
There is a statutory requirement under The Housing
(Scotland) Act 2001, Section 53 (1) which sets out the
duty for social landlords to develop and publish a
Tenant Participation Strategy in consultation with
tenants.  The Housing (Scotland) Act 2010 places
additional duties on social landlords to involve both
tenants and other customers in housing and related
activities.
The Tenant Participation Strategy 2020-25 (Involving
Tenants - Improving Services) is the main source of
information regarding tenant participation; it outlines
opportunities to participate in the monitoring and
development of the housing service.  The aim of the
strategy is to continue to develop and improve how
the council communicates with tenants and residents
and ensure opportunities are provided for
participation and involvement accessible to all.
19-02-20
Tenant Participation
Strategy 2020-25
link to report 
link to strategy
5-year strategy, with an
annual review and
progress on the delivery of
the action plan reported to
committee annually. 
Strategy will be reviewed
and updated in 2025 when
it reaches the end of its
current life.     
X  Chief Officer
(Housing
Management)
Housing
Committee
Rapid Rehousing Plan
Transitioning to rapid rehousing is an opportunity for
the council and partners to redress the balance of
housing and support options relating to availability
and accessibility for homeless households.  The
Rapid Rehousing Transition Plan (RRTP) sets out
how the council and partners will move forward from
the current position to deliver the future model.  
The plan provides a guide as to how to move
homeless households into settled housing as quickly
14-11-18
Rapid Rehousing
Transition Plan 2019-24
link to plan 
5-year plan, with an
annual review and
progress on the delivery of
the action plan reported to
committee annually. 
Plan will be reviewed in
2024 when it reaches the
end of its current life and    
X   Chief Officer
(Housing
Management)
Housing
Committee
Page 231 of 326

Page 232

36 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of
document / 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2024
Cycle 2
Apr - Jun
2024
Cycle 3
Aug - Sept
2024
Cycle 4
Oct - Dec
2024
Cycle 1
Jan - Mar
2025
2025/26 2026/27
as possible.
2023/24 is the final year of RRTP funding; however, it
is likely that future funding will be provided to enable
the implementation of the Prevention of
Homelessness Bill.
when future funding is
clarified.
Health and social care strategic plan
In presenting this ten-year strategic plan, the aim was
to set in motion an approach to delivering health and
social care that will lead over time to achieving the
national health and wellbeing outcomes prescribed in
the Public Bodies (Scotland) Act 2014 and the
outcomes linked to The Children and Young People’s
(Scotland) Act 2014 and the Community Justice
(Scotland) Bill.
08-03-16 (the plan was
signed off by the Shadow
IJB on 8th March 2016)
Integrating Health and
Social Care in North
Lanarkshire - Strategic
Plan 2016-26 
link to plan
10-year plan which will be
reviewed during 2025/26
when it reaches the end of
its current life.     
X  Chief Officer
(Health and
Social Care)
Integration Joint
Board (for
approval)
Health and Social Care Strategic Commissioning Plan
The Public Bodies (Joint Working) Scotland Act 2014
requires each Integrated Joint Board to produce a
Strategic Plan. Health and Social Care North
Lanarkshire published its ten-year strategy Safer,
Healthier, Independent Lives in 2016 and since then
a Strategic Commissioning Plan has been produced
to outline the key intentions to be delivered.
22-03-23
Health and Social Care
Strategic Commissioning
Plan 2023-26
link to plan 
3-year plan which will be
reviewed during 2025/26
when it reaches the end of
its current life.     
X  Chief Officer
(Health and
Social Care)
Integration Joint
Board (for
approval) / Policy
and Strategy
Committee (for
awareness)
North Lanarkshire Strategy for Adult Carers and Young Carers
The Carers (Scotland) Act 2016 came into effect in
April 2018 and introduced new statutory requirements
for planning and arranging support for unpaid Adult
Carers and Young Carers.  One of the key provisions
of the legislation is a duty on local authorities and
health boards to prepare a carers strategy for their
area.
05-11-19
North Lanarkshire
Strategy for Adult Carers
and Young Carers 2019-24
link to strategy
5-year strategy which will
be reviewed during
2024/25 when it reaches
the end of its current life; 
update scheduled for
committee in cycle 4 of
2024.     
X    Chief Officer
(Health and
Social Care)
Integration Joint
Board (for
approval)
Lanarkshire Mental Health and Wellbeing Strategy
The five-year strategy Lanarkshire Mental Health and
Wellbeing Strategy for all age groups is informed by a
range of work including the national Mental Health
Strategy 2017-27, while reflecting the needs of
people living in Lanarkshire and importantly the
experience of people using local services.  This aims
to ensure the promotion of mental health and
wellbeing underpins all aspects of support and
services. 
The joint approach to developing the support and
services required when needed will ensure
Lanarkshire becomes a place that champions and
promotes good mental health for all.
26-09-19 
Mental Health and
Wellbeing Strategy for
Lanarkshire 2019-24
link to strategy
5-year strategy which will
be reviewed during
2024/25 when it reaches
the end of its current life.    
X   Chief Officer
(Health and
Social Care)
Policy and
Strategy
Committee (for
endorsement)
Participation and Engagement Strategy
Health and Social Care North Lanarkshire (HSCNL)
has a firm commitment to ensuring ongoing
meaningful involvement with the communities it
serves. The engagement and participation strategy
sets out how participation and engagement is and will
be achieved. This ensures the right systems and
supports in place to enable effective engagement
26-09-19 
Engagement and
Participation
Strategy, Framework and
Principles 2021-24
link to strategy
3-year plan which will be
reviewed during 2025/26
when it reaches the end of
its current life and to align
timescales more closely to
the Strategic
Commissioning Plan.     
X  Chief Officer
(Health and
Social Care)
Integration Joint
Board (for
approval)
Page 232 of 326

Page 233

37 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of
document / 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2024
Cycle 2
Apr - Jun
2024
Cycle 3
Aug - Sept
2024
Cycle 4
Oct - Dec
2024
Cycle 1
Jan - Mar
2025
2025/26 2026/27
with all stakeholders.
Tackling Poverty Strategy
North Lanarkshire’s Tackling Poverty Strategy reflects
a concerted commitment across the Community
Planning Partnership to drive inclusive growth and
achieve prosperity for the people and communities of
North Lanarkshire - to ensure that North Lanarkshire
will be the place where everyone has equality of
opportunity, a place where individuals and
communities are poverty free.
28-09-23
Towards a Fairer North
Lanarkshire - Tackling
Poverty Strategy 2023-26
link to report 
link to strategy
3-year strategy which will
be reviewed / updated
when it reaches the end of
its current life.  Supporting
action plan is updated
annually. 
X Chief Social
Work Officer
(Education,
Families, Justice,
Integrated
Practice)
Policy and
Strategy
Committee
Children’s Services Plan
This plan summarises the purpose and intentions of
North Lanarkshire Children's Services Partnership,
on behalf of the North Lanarkshire Partnership in the
joint planning and improvement of children's services
in North Lanarkshire.
It provides an overview of partnership activity to
deliver services and supports for children, young
people and their families within the current legislative,
wider planning, and ongoing improvement framework. 
It identifies priorities and outcomes that are the basis
for more detailed planning expressed in supporting
annual action plans. 
Planning and delivery to children, young people, and
families is further underpinned by the principles of the
United Nations Convention on the Rights of the Child
(UNCRC).
July 2023
North Lanarkshire
Partnership Children’s
Services Plan 2023-26
link to report 
link to plan 
3-year plan which will be
reviewed / updated in
2026 when it reaches the
end of its current life. 
X Chief Social
Work Officer
(Education,
Families, Justice,
Integrated
Practice)
Children’s
Services
Partnership
Board on behalf
of the North
Lanarkshire
Partnership
(Endorsement by
the North
Lanarkshire
Partnership
Strategic
Leadership
Board and
Education and
Families
Committee
thereafter)
Community Justice Outcome Improvement Plan
The Community Justice (Scotland) Act 2016 (the Act)
provides the legislative framework for the model of
community justice. As part of that model, s17 of the
Act requires the Scottish Ministers to publish a
performance framework, setting out nationally
determined outcomes which are to be achieved in
each local authority area, and national indicators
which are to be used in measuring performance
against these. 
The Community Justice Performance Framework
(CJPF) is a revised version of that framework and is
published as per s18(4)(a) of the Act.
Section 6 of the Act outlines statutory guidance in
relation to the preparation of Community Justice
Outcomes Improvement Plans for each local
authority area in Scotland as required under sections
19-23 of the Community Justice (Scotland) Act 2016.
July 23
North Lanarkshire
Community Justice
Outcome Improvement
Plan (CJOIP) 2023-28
link to plan 
5-year plan.  
As per legislative
requirements local
partnerships are required
to review CJOIPs following
the publication of a revised
national strategy. 
The local CJOIP will
require to be reviewed in
2028. 
Chief Social
Work Officer
(Education,
Families, Justice,
Integrated
Practice)
Community
Justice
Partnership
Board on behalf
of the North
Lanarkshire
Partnership
(Endorsement by
the North
Lanarkshire
Partnership
Strategic
Leadership
Board and
Education and
Families
Committee
thereafter)
The Promise and Me Partnership, Corporate Parenting in North Lanarkshire
The Children and Young People (Scotland) Act 2014
and accompanying statutory guidance place duties
on a range of public bodies with respect to looked
21-05-19
Corporate Parenting
Strategy 2019-22 
The updated Strategy to
2026 is scheduled to be
submitted to the Childrens       
Chief Social
Work Officer
(Education,
Children
Services
Partnership
Page 233 of 326

Page 234

38 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of
document / 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2024
Cycle 2
Apr - Jun
2024
Cycle 3
Aug - Sept
2024
Cycle 4
Oct - Dec
2024
Cycle 1
Jan - Mar
2025
2025/26 2026/27
after children and young people and care leavers.
Collectively these duties are designed to ensure
organisations commit resource and focus to
promoting the wellbeing of looked after children and
care leavers. The duties on corporate parents
outlined in Section 58 of the Act include the need to: 
• Be alert to matters which might adversely affect the
wellbeing of an eligible young person. 
• Assess the needs of eligible children and young
people to any service or support provided. 
• Seek to provide eligible children and young people
with opportunities to promote their wellbeing. 
• Keep their approach to corporate parenting under
constant review, seeking out improvement
wherever possible.
In addition, corporate parents must collaborate with
each other, publish corporate parenting plans, and
report at prescribed intervals on these plans to
Scottish Ministers.
This was previously the Corporate Parenting
Strategy.
link to strategy  Services Partnership
Board in February 2024
and committee in cycle 1
of 2024.  
Families, Justice,
Integrated
Practice)
Board and
Education,
Children, and
Families
Committee
Scottish Attainment Challenge Plan 
The Scottish Attainment Challenge (SAC) is a major
national initiative designed to achieve equity in
educational outcomes by closing the poverty related
attainment gap for children and young people. The
SAC focuses on accelerated, targeted improvement
activity in literacy, numeracy and health and wellbeing
in specific areas of Scotland. It supports and
complements the broader range of initiatives and
programmes to ensure that all of Scotland’s children
and young people reach their full potential. In
November 2021, the Cabinet Secretary for Education
and Skills announced plans for the continuation of the
Scottish Attainment Challenge (SAC) from 2022-23 to
2025-26. This plan outlined a reconfigured model
through which all local authorities would benefit
through a new funding model, now referred to as
Strategic Equity Fund (SEF).  The core SEF Plan for
session 2023 - 2025 was designed to align the
programme more closely with The Plan for North
Lanarkshire ensuring that the drive, vision and
increased connectedness maximises the impact of
the approaches to closing the poverty related
attainment gap.
22-11-22
Strategic Equity Fund
Plan 
link to plan 
1 year plan which will be
reviewed and updated
annually. 
X    X  Chief Officer
(Education)
Education,
Children, and
Families
Committee
West Partnership Regional Improvement Plan
The West Partnership Regional Improvement Plan
sets out the key areas for collaborative action to drive
improvement across the Glasgow City Region. It sets
out the West Partnership’s offer to all eight local
authorities and was developed in response to
stakeholder engagement highlighting activities which
local authorities indicated they would benefit from. 
22-11-22
West Partnership
Improvement Plan 2022/23
link to plan 
1 year evaluation and
improvement plan which
will be reviewed and
updated annually.   
X    Chief Officer
(Education)
Education,
Children, and
Families
Committee
Page 234 of 326

Page 235

39 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of
document / 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2024
Cycle 2
Apr - Jun
2024
Cycle 3
Aug - Sept
2024
Cycle 4
Oct - Dec
2024
Cycle 1
Jan - Mar
2025
2025/26 2026/27
The plan is organised under three key areas, each
led by two Directors of Education / Chief Education
Officers - wellbeing for learning; curriculum, learning,
teaching, and assessment; and leadership,
empowerment, and improvement.
Programmes and activities are in place across the
three areas that are designed to support the work of
school staff and local authority central officers.  A
fourth workstream, also led by two Directors of
Education, is that of evaluation and reporting.
The Cabinet Secretary for Education and Skills,
announced in June 2023, that funding for the
Regional Improvement Collaboratives (RICs) would
taper from session 2024/25.  As such, confirmation is
awaited whether or not a West Partnership Plan, in its
current format, will be produced moving forward. 
Mental Health, Wellbeing, and Resilience
The Roadmap to Recovery is the Health and
Wellbeing Plan for schools and partner services in
North Lanarkshire.  This sets out a way forward in
developing the health and wellbeing of learners
recognising the current context in North Lanarkshire,
particularly following the impact of the pandemic. The
strategy recognises the importance of developments
in North Lanarkshire in relation to health and
wellbeing including the Empowering Clusters model
and the Getting it Right for Every Child (GIRFEC)
pathway. It looks at high level outcomes that can be
improved, linking into the Children’s Services Plan
and The Plan for North Lanarkshire.
13-09-22
Health and Wellbeing
Roadmap to Recovery
link to strategy 
3-year plan which will be
reviewed during 2025
when it reaches the end of
its current life.     
X  Chief Officer
(Education)
Education,
Children, and
Families
Committee
Developing the Young Workforce Plan
This plan sets out how the council and partners will
continue to work together to improve employability
experiences and increase the number of young
people entering positive and sustained post-school
destinations. 
Alongside Getting it Right for Every Child (GIRFEC)
and Curriculum for Excellence, it is one of just three
pillars which drive improvement across all parts of the
curriculum and Scottish education system.  The plan
is organised within three discrete but linked sections -
the universal guarantee, the additional offer, and the
intensive offer to improve outcomes for all children
and young people and ensure no one is left behind.
20-11-22
Developing the Young
Workforce Plan for 2022-
25
link to plan
3-year plan which will be
reviewed during 2025
when it reaches the end of
its current life.     
X  Chief Officer
(Education)
Education,
Children, and
Families
Committee
Gaelic Language Plan
Local authorities are required to produce a Gaelic
Language Plan (GLP) every five years detailing how
the language will be developed across all sectors in
accordance with the national plan
(https://www.gaidhlig.scot/en/gaelic-language-
plans/the-national-gaelic-language-plan/) 
The council’s Gaelic Language plan for 2022-27
aligns to the national plan, with three high level aims
12-09-23
Gaelic Language Plan
2022-27
link to plan
5-year plan which will be 
reviewed / updated during
2026/27 when it reaches
the end of its current life.      
X Chief Officer
(Education)
Education,
Children, and
Families
Committee
Page 235 of 326

Page 236

40 
Strategy, Policy, Plan Latest version approved
Strategy timeframe / 
review frequency of
document / 
next review date
COMMITTEE MEETING DATES 
Chief Officer
responsible
Committee for
Strategy / Policy /
Plan approval
Cycle 1
Jan - Mar
2024
Cycle 2
Apr - Jun
2024
Cycle 3
Aug - Sept
2024
Cycle 4
Oct - Dec
2024
Cycle 1
Jan - Mar
2025
2025/26 2026/27
to increase the use of Gaelic, increase the learning of
Gaelic, and promote a positive image of
Gaelic.  These aims cover all aspects of the
provisions made for increasing the cachet and
visibility of Gaelic language and culture, for
enhancing and expanding the educational offer to
children and adults, and for engaging with
stakeholders to identify their wants and needs in
relation to Gaelic.
Community Learning and Development Partnership Plan
The North Lanarkshire Community Learning and
Development Partnership was formally created in
1999, in response to Scottish Government’s
Communities: Change through Learning report. The
partnership brings together local organisations with
responsibility for community-based learning and
capacity building.
The Requirements for Community Learning and
Development (Scotland) Regulations (2013)
introduced a legal requirement for partners to jointly
produce a Community Learning and Development
plan every three years, as detailed in the Strategic
Guidance for Community Planning Partnerships:
Community Learning and Development (2012) and
subsequent national guidance.  The North
Lanarkshire Community Learning and Development
Partnership’s current plan runs from 2021-24.
23-08-21
North Lanarkshire
Community Learning and
Development Partnership
Plan 2021-24
link to plan 
3-year plan which will be
reviewed / updated during
2024/25 when it reaches
the end of its current life. 
X  Chief Social
Work Officer
(Education,
Families, Justice,
Integrated
Practice)
Education,
Children, and
Families
Committee
Community Learning and Development Action Plan
This plan outlines the priority actions and milestones
for the council’s community learning and
development work through the three teams - adult
learning and resettlement, family learning, and youth
work.  It reflects the ambitions of The Plan for North
Lanarkshire, the aims of the Community Learning and
Development Partnership Plan 2021-24 as well as
national plans and policies which affect the provision
of community learning and development services. 
For 2022-25, the previously separate delivery plans
for adult learning, family learning, and youth work are
now integrated within the one plan. 
Community Learning and
Development Action Plan
2022-25
link to plan 
3-year plan which will be
reviewed / updated during
2025 when it reaches the
end of its current life.     
X  Chief Social
Work Officer
(Education,
Families, Justice,
Integrated
Practice)
Education,
Children, and
Families
Committee
North Lanarkshire Volunteering Strategy
The North Lanarkshire Volunteering Strategy was
developed by the North Lanarkshire Volunteering
Partnership during 2022 to strengthen volunteering
across North Lanarkshire for the benefit of
volunteers, residents, and communities supported by
volunteers, and volunteer-involving organisations.
The North Lanarkshire Volunteering Partnership
includes representatives from North Lanarkshire
Community Planning Partnership (CPP) partner
agencies.
15-03-23
North Lanarkshire
Volunteering Strategy
2023-26
link to strategy
3-year strategy which will
be reviewed / updated
during 2026 when it
reaches the end of its
current life.      
X Chief Officer
(Strategic
Communication
and
Engagement)
Approval by the
North
Lanarkshire
Partnership
Strategic
Leadership
Board and
endorsement by
the Communities
Committee
thereafter 
Page 236 of 326

Page 237

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref KH/SL Date 14/03/24 
Digital and IT Strategy 2024 to 2027 
From  Katrina Hassell, Chief Officer (Business and Digital)  
E-mail HassellK@northlan.gov.uk Telephone 07903 096 121 
Executive Summary
Technology can offer so many benefits for the people and communities in North
Lanarkshire - it can support people to live independently in their own homes, it can enable
seamless end to end processes to fulfil requests for service, it can mean vulnerable people
get more joined up help when it really matters, it can provide a way to better use data to
monitor and manage demand and improve the delivery of services to the public, and it is
key to connecting people and communities with place and improving their quality of life by
providing access to new opportunities, new ways of working, learning, and doing business,
and new ways to ensure quicker and easier access to essential care, supports, and
services. 
Since 2019, the council has been actively delivering the vision for a digital North
Lanarkshire to support the ambition set out in The Plan for North Lanarkshire with plans to
achieve Digital Communities, a Digital Economy, and a Digital Council providing the focus
for activities.  To guide and support the drive for a Digital North Lanarkshire, a five-year
Digital and IT Strategy was established and approved in June 2019.  This was
subsequently kept under review and regularly updated to ensure it remained current and
relevant in the modern digital world. 
With the new Programme of Work to 2028 and seven priorities for delivery approved in
March 2023, the opportunity was taken to realign the Digital and IT Strategy accordingly
and firmly establish what it means to be digital and move from doing digital to being digital. 
The three-year Digital and IT Strategy for 2024 to 2027 therefore aims to provide a clear
direction and ensure a common shared understanding of the journey that needs to be taken
to achieve a Digital North Lanarkshire. This also makes it clear how digital will support
delivery of the other six Programme of Work priorities and where resources need to be
targeted through a one council approach.   
Following extensive development work which has involved a range of stakeholders both
internal and external to the council, the new Digital and IT Strategy for 2024 to 2027 is
attached for Policy and Strategy Committee approval. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
Item 12
Page 237 of 326

Page 238

1. Background 
1.1  Policy and Strategy Committee are well versed on the council’s ambition to deliver a
digital North Lanarkshire.  This was established through the initial five-year Digital and
IT Strategy when it was initially approved at Policy and Strategy Committee in 2019. 
1.2  Subsequent updates to the Digital and IT Strategy in 2020 and 2022 have ensured it
has remained up to date and relevant as the modern digital world grows with rapid
advancements in technology and global connectivity accelerating the pace, scope, and
impact of change.  This has also ensured a consistent focus on achieving a Digital
North Lanarkshire through digital communities, a digital economy, and a digital council.   
1.3  A report to the Policy and Strategy Committee in September 2022 provided detailed
findings following a root and branch review of the DigitalNL programme at that time, the
key delivery mechanism for the Digital and IT Strategy.  This outlined both the Year 4
Roadmap (of the five-year programme) and the anticipated benefits realisation
programme.  A follow up report in December 2022 set out the programme deliverables
achieved to date against those outlined within the Full Business Case approved by
Elected Members in March 2019 and outlined the next steps for Year 5 (the final year
of the initial DigitalNL transformation programme). 
1.4  Moving forward, the vision for a Digital North Lanarkshire is one of the seven priorities
for delivery in the Programme of Work for 2023 to 2028 (as approved at the Policy and
Strategy Committee in March 2023) with any residual activity from the original Digital
NL programme appropriately transitioned.  Through the delivery of the Digital North
Lanarkshire priority, Programme of Work activities will focus on developing a skilled
digital workforce, promoting an innovative sustainable culture, and providing digital
leadership for an evolving North Lanarkshire.     
1.5  The Digital and IT Strategy is key to providing the direction to deliver a Digital North
Lanarkshire while ensuring activities build on successes to date and digital thinking is
embedded into everyday behaviours and actions, with employees embracing digital
technology to do business significantly differently and always considering a digital-first
approach. 
1.6 To ensure appropriate alignment to the Programme of Work to 2028 and awareness of
the pivotal interconnected role of the Digital North Lanarkshire priority in enabling and
supporting delivery of the other six priorities, a new Digital and IT Strategy has been
developed for 2024 to 2027.  The opportunity was also taken to firmly establish a clear
direction in the Strategy in terms of what it means to be digital, what the priorities are
for action, what everyone’s role is, and where resources need to be targeted through a
one council approach.  
(1) Recognise the extensive redevelopment of the Digital and IT Strategy for 2024 to 2027
in order to ensure alignment to the Programme of Work to 2028 and provide a clear
direction for delivery towards achieving a Digital North Lanarkshire, and
(2) Approve the new Digital and IT Strategy for 2024 to 2027. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work All Programmes of Work
Page 238 of 326

Page 239

1.7 Following extensive development work which has involved a range of stakeholders both
internal and external to the council, the new Digital and IT Strategy for 2024 to 2027 is
attached for Policy and Strategy Committee approval.   
2. Digital and IT Strategy 2024 to 2027 
2.1 The impact of the global pandemic demonstrated that the modern digital world is fast
moving and forever changing and there is no doubt it changed how technology is used
for work, learning, accessing services, doing business, and connecting with others and
accelerated (at speed) the adoption of digital technologies by many years.  It also
changed the landscape within which The Plan for North Lanarkshire requires to be
delivered.   
2.2 As technology continues to play an ever-increasing role in the way in which service
users, residents, and businesses will live, learn, work, invest, and visit within North
Lanarkshire both now and in the future, it is vital that the council - as a critical provider
of public care, supports, and services - does all it can to keep pace with the
development of technology, while improving the user experience, focussing resources
on those individuals in the most vulnerable situations and most in need, and reducing
the cost of service delivery to be able to do more with less.   
2.3 As such, the new Digital and IT Strategy for 2024 to 2027 follows an extensive
redevelopment process compared to previous annual updates. Engagement with
delivery leads across Business and Digital, the council’s Operational Management
Team, and Gartner (the industry expert in the technology field) has shaped the new
Digital and IT Strategy for 2024 to 2027 which is attached in Appendix 1.  The key points
that shaped the Strategy are summarised below:   
• Ensuring a shared context and common shared understanding in terms of what it
means to be digital, what the Digital and IT Strategy aims to achieve and how, and
within what context is this to be delivered (i.e. the context within the council and
across North Lanarkshire and the wider local government environment).
• Having strategic principles in place to guide behaviours and actions and ensure
that being digital is everyone’s business.  This includes establishing the business
and digital capabilities critical to the success of the Strategy.
• Making it real - firmly establishing what digital transformation actually means and
how it can make a difference to people’s lives and support the transformation of
North Lanarkshire’s communities.  To do this digital transformation must be seen
as the means to a clearly defined end; not the end in itself.  
• Delivering digital solutions safely and securely, within an environment where rapid
technological advancements bring increased vulnerability to cybersecurity threats
and the need to prioritise digital security measures.
• Reiterating that communication, enabling transformation within existing resources,
and enhancing skills are critical to the successful deployment of the new Strategy. 
As such, these are reflected in the Strategy itself in terms of the next steps and key
areas for delivery during 2024/25 through the supporting Digital North Lanarkshire
Programme of Work.   
Next steps 
2.4 To ensure all relevant stakeholders have had an opportunity to input to the development
of the new Digital and IT Strategy for 2024 to 2027 at key points in its creation, a
programme of engagement and consultation was established as set out in the following
table.
Page 239 of 326

Page 240

Group Date Engagement / consultation / communication
Engagement
Gartner July to
September 2023
Various workshops and interactions to gain
feedback on the previous version of the Digital and
IT Strategy and gather insights to help develop the
new Strategy.
Business and Digital
Extended Management
Team
September 2023
to January 2024
Workshop and discussions to work through the
steps in the process to develop a new Digital and
IT Strategy and identify the content.
Operational
Management Team 4th October 2023
To inform the development of the new Digital and
IT Strategy and seek feedback on two key
questions in terms of what the Strategy needs to
include and how to positively impact on the culture
of the organisation.
Consultation
Business and Digital
Extended Management
Team
10th January
2024
Consultation exercise on the first draft of the Digital
and IT Strategy for 2024 to 2027.
Gartner 10th January
2024
Consultation exercise on the first draft of the Digital
and IT Strategy for 2024 to 2027.
Corporate Management
Team 
1st to 9th February
2024
Input to the consultative draft of the Digital and IT
Strategy 2024 to 2027.
Driving Digital Locally -
Digital sub-group February 2024 Input to the consultative draft of the Digital and IT
Strategy 2024 to 2027.
Group Business
Managers February 2024 Input to the consultative draft of the Digital and IT
Strategy 2024 to 2027.
Communication
Operational
Management Team 14th March 2024 Overview of what implementing the Digital and IT
Strategy for 2024 to 2027 means in practice.
Community Boards February / March
2024
Overview of the Digital and IT Strategy 2024 to
2027 and what it means for communities. 
2.5 The Digital and IT Strategy for 2024 to 2027 will be kept under review during its lifecycle
and an annual update on implementation reported to the Policy and Strategy
Committee.  Once the Strategy reaches the end of its current life in 2026/27, and the
Digital North Lanarkshire Programme of Work is maturing towards its next review point
of 2028, further work will be undertaken to ensure the ongoing sustainability of the
digital vision set out in The Digital and IT Strategy in line with The Plan for North
Lanarkshire.  
3. Measures of success
3.1 Success will be evidenced through technology being efficiently and effectively
deployed, in an agile manner, to support the implementation of new digital service
delivery models and solutions that are designed to meet the needs of modern
businesses and communities. 
Page 240 of 326

Page 241

4. Supporting documents 
4.1 Appendix 1: Digital and IT Strategy 2024 to 2027 
Katrina Hassell
Chief Officer (Business and Digital)  
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
An Equality / Fairer Scotland Duty Impact Assessment has been undertaken for the
Digital and IT Strategy 2024 to 2027.  Key impacts are that efforts to move services
online may be particularly disadvantageous and out of reach for older people, low-
income groups, those with a disability, and people who are homeless or are asylum
seekers.  There may also be impacts as a result of more diversity in local
communities in terms of changes in language and cultural norms.  Poverty will
remain a factor in accessibility in terms of ensuring that no one is left behind or
digitally excluded.  Research suggests the pandemic stands to make the impacts of
digital exclusion worse for individuals in the most vulnerable situations, therefore
the new Strategy aims to improve the connectivity and accessibility of North
Lanarkshire as a place, and also improve the ability of local people and
communities to gain the skills and confidence required to help them benefit from
the opportunities of being digitally connected.  As such, the Driving Digital Locally
digital subgroup will continue to play its key role in enabling enable local
communities to participate in designing and deploying modern council services and
ensuring that no one is left behind or digitally excluded 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐
Page 241 of 326

Page 242

If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The Digital North Lanarkshire priority in the Programme of Work to 2028 envisages
significant changes to applications, software, hardware, and connectivity, with all
duly considered from a Digital First and Enterprise Architecture perspective through
the key governance groups of the Enterprise Architecture Governance Group
(EAGG) and Data Governance Board (DGB). 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Providing digital services that offer online, anytime access to services will have a
positive environmental impact across several important areas such as minimising
waste and recycling, thanks to the limited need for paper forms.  The development
of a digital workforce will reduce the council’s carbon footprint by saving energy and
reducing emissions. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Communication with all stakeholders will remain a key priority in implementing the
Digital and IT Strategy 2024 to 2027 and deploying the roadmap and delivery plan
in pursuit of a Digital North Lanarkshire.
5.9 Risk impact
Page 242 of 326

Page 243

Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
The Strategy contains a section on governance and risk to ensure the four risks on
the council’s Corporate Risk Register are given due consideration.  These risks are
Information Security and Information Governance, ICT Operational Capability, Digital
and IT Strategy, and Digital Adoption.  These risks are subject to regular formal
review processes by relevant senior management in line with the review frequency
set out in the council’s Risk Management Strategy.  Periodic reviews are also
undertaken by the Business and Digital Management Team, Corporate Management
Team, and the Audit and Scrutiny Panel in line with their respective governance roles. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC).
Implementation of the Digital and IT Strategy 2024 to 2027 is considered to have
an indirect impact as the strategy is not directly aimed at children, but will have an
impact on them. In particular article 2 (non-discrimination) and article 23 (children
with a disability).  It is recognised that the rights of the child, and the needs of
certain groups, require to be considered throughout the journey to a Digital North
Lanarkshire. The Strategy aims to ensure that no one is digitally excluded and
there is opportunity to improve people’s lives though digital technology, solutions,
and skills. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☒ No ☐ 
Page 243 of 326

Page 244

Page 244 of 326

Page 245

2 
Document control
Title Digital and IT Strategy 2024-27
Owner Katrina Hassell, Chief Officer (Business and Digital) Contact HassellK@northlan.gov.uk 
Governance group Policy and Strategy Committee
Author Susan Lawrie, Strategy and Performance Manager Contact LawrieS@northlan.gov.uk 
Revision history
Number Originator Date review commenced Revision description / record of change
Original strategy created Linda Johnston 2019 -
1.0 Linda Johnston 2020 Annual review
2.0 Linda Johnston September 2021 Annual review
3.0 Linda Johnston September 2023
Review and redevelopment carried out as the previous strategy had reached the end
of its life and re-alignment was required with the direction set in the council’s new
Programme of Work for 2023 to 2028. 
Document approvals
Number Governance group Date approval granted Date approval to be requested (if document still draft)
Original document  Transformation and Digitisation Committee
Policy and Strategy Committee
May 2019
June 2019 
1.0 Transformation and Digitisation Committee September 2020 
2.0 Transformation and Digitisation Committee February 2022 
3.0 Policy and Strategy Committee  March 2024 
Consultation record (for most recent update)
Status of document
consulted upon Digital and IT Strategy 2024-27
Stakeholders consulted /
date / process
Business and Digital Extended Management Team (September 2023 to January 2024); Gartner (July 2023 to January 2024);
Corporate Management Team (February 2024); Group Business Managers (February 2024); Driving Digital Locally Digital sub-group
(February 2024); Community Boards (February/March 2024), Operational Management Team (04/10/23 and 14/03/24). 
Strategic alignment 
Next review date
Review date September 2026 
The Plan for North Lanarkshire and Programme of Work.  All 5 priorities and all 25 ambition statements within The Plan for North Lanarkshire.  Strategic Policy
Framework.
Page 245 of 326

Page 246

3 
Table of contents 
Page
number
Introduction  ……………………………………………………………………………..… 4  
Context  …………………………………………………………………………………….. 5 - 9
Roadmap to delivery  ……………………………………………………………………... 10 - 12
Making a difference  ………………………………………………………………………. 13 - 16
Governance and risk  …………………………………………………………………..… 17
Conclusion  ………….…………………………………………………………………..… 18
Appendix 1: The evolution of North Lanarkshire’s digital strategy  ………………..… 19
Appendix 2: North Lanarkshire’s digital journey  ……………………………………….  20 - 22
Appendix 3: Delivering a Digital North Lanarkshire  ………………………………….. 23 - 24
Appendix 4: Delivery principles  ………………………..……………………………….. 25 - 27
Appendix 5: Frameworks, plans, and sub-policies  …………………………………… 28 - 29
Appendix 6: Enterprise architecture principles  ……………………………………..… 30 
Page 246 of 326

Page 247

4 
Introduction
Escalating the journey to a Digital North Lanarkshire 
Technology can offer so many benefits for the people and communities in North Lanarkshire.  It can support people to live independently in their own homes. 
It can enable seamless end to end processes to fulfil requests for service.  It can mean vulnerable people get more joined up help when it really matters.  It
can provide a way to better use data to monitor and manage demand and improve the delivery of services to the public.  It is key to connecting people and
communities with place and improving their quality of life by providing access to new opportunities, new ways of working, learning, and doing business, and
new ways to ensure quicker and easier access to essential care, supports, and services. 
Increasing demand for care, supports, and services has arisen from significant demographical changes which are seeing more elderly people in the local
community and more elderly people living alone and in their own home for longer.  When combined with growing pressures from increasingly complex and
intergenerational social and economic issues across local communities and constrained public spending, this brings a wide-ranging need for digital
technology that brings people together to help more people in need across North Lanarkshire while at the same time helping the council to do more with less. 
With public expectations ever evolving and the reliance on technology ever growing and ever changing, the needs of people are changing too and there is 
more diversity in the makeup, language, and cultural norms of local communities.  This means there is also a need for the council to adapt and find new
ways to interact with people and communities.  Strong foundations have been established to improve the connectivity and accessibility of North Lanarkshire
as a place and enhance the ability of local people, businesses, and communities - as well as council staff - to gain the skills and confidence required to help
them benefit from the opportunities of being digitally connected, but there’s more can be done to make a difference and to make sure that no one is left
behind.   
The vision for a Digital North Lanarkshire, with investment targeted in digital and technological solutions that will be of most benefit to the people and
communities of North Lanarkshire, aims to help realise inclusive growth and prosperity for all in line with the council’s long-term ambition in The Plan for
North Lanarkshire to make North Lanarkshire the place to live, learn, work, invest, and visit. 
Against this backdrop the council needs to be clear about what it means to be digital - as this can mean different things to different people.  It needs to be
clear what the priorities are for action and where resources need to be targeted through a one council approach.  The Digital and IT Strategy for 2024 to
2027 therefore aims to provide a clear direction in this respect and ensure a common shared understanding of the journey that needs to be taken to achieve
a Digital North Lanarkshire. 
Page 247 of 326

Page 248

5 
Context
Digital trends and behaviours 
The impact of the global pandemic demonstrated that the modern digital world is fast moving
and forever changing with rapid advancements in technology and global connectivity
accelerating the pace of transformation.   
With so much change in a short space of time - new technology, new ways of engaging with
others, new ways of learning, new ways of doing business, new ways of working - the
pandemic accelerated the idea of being able to work, learn, or do business anywhere with a
bank of tools readily available to enable and support this.   
Trends in automation and AI (artificial intelligence) are growing and seen as a key tool to
create new value for organisations, see truly transformed ways to operate and manage
complex businesses, and deliver not only value through productivity and efficiency but deliver
it fast.  Industry thinking is also advancing considerably through the implications for a virtual
workforce (i.e. bots) and virtual desktop assistants which are capable of quickly learning to
auto complete a wide range of activities and take proactive steps to make workflow faster and
smoother. 
In such a dynamic digital and technological world though, it's easy to lose sight of the context
and what really matters.  As technology continues to play an ever-increasing role in the way in
which service users, residents, businesses, and staff will live, learn, work, invest, and visit
within North Lanarkshire both now and in the future, it is vital that the council - as a critical
provider of public care, supports, and services - does all it can to keep pace with the
development of technology while improving the user experience, focussing resources on
those individuals in the most vulnerable situations and most in need, and reducing the cost of
service delivery. 
The context that matters therefore is not to see digital as a thing to add on to the day job, but
more as an integral way of doing those everyday activities - that make a difference to people’s
lives - more efficiently and effectively.  This means applying the most appropriate practices,
processes, and technologies to respond to the needs of North Lanarkshire’s people and communities
while recognising their constantly changing and increasing expectations in an ever-evolving
technological environment. 
Research by Gartner has identified key digital business trends (as shown in Figure 1) that help to demonstrate the current context around the multifaceted
impacts of what it means to be digital.  This is accompanied by a PESTLE analysis (in Figure 2 on the next page) that provides added context in this respect. 
Figure 1
Digital business trends (Source: Gartner (CEB analysis)
Page 248 of 326

Page 249

6  Figure 2
PESTLE analysis
Page 249 of 326

Page 250

7 
Key facts and figures about North Lanarkshire 
North Lanarkshire is Scotland’s fourth largest local
authority area by population. It is ideally situated in the
heart of Scotland with first-rate connectivity to the rest of
Scotland, the UK, and the world.
The council serves a population of 341,400 people and as
the fifth most densely populated local authority area, North
Lanarkshire is divided into 21 wards which are represented
by 77 elected members.
The council employs 15,455 people (13,040 full-time
equivalent).  77% of employees are female and 23% are
male. 74% of employees live in North Lanarkshire. 
Figure 3
Facts and figures about the people and communities of North Lanarkshire
Page 250 of 326

Page 251

8 
What it means to be digital in North Lanarkshire 
Heather is a Housing Officer. She needs accurate and up to date
information to be able to schedule inspections by technical officers and
organise appointments for repairs. 
The introduction of the Microsoft Dynamics 365 field services product provided
Heather with real time visibility to helps her arrange appointments that suited
both tenants and officers. 
As this product seamlessly links into the council’s other digital products, Heather
can have a single view of the customer’s data at her fingerprints, this reduces the
need to access multiple systems to retrieve the information required and it
enables a quick and efficient end to end service for the tenant. 
Using data to improve service delivery.
Louise logs a request on the council’s online system to report a fallen tree
in her street, uploading a picture of the tree and location. 
Louise receives an automated acknowledgement via e-mail that tells her that the
request has been logged.  She also gets - right there and then - an estimated
timescale for resolution. 
Louise’s service request is automatically sent to a mobile working system which
schedules the work. An officer receives information about the job on his phone,
telling him where the fallen tree is. 
The officer completes the work then updates the request on his phone to say the
job has been completed. This triggers an automated e-mail update to Louise,
who appreciates being kept fully informed and up to date at all stages of her
request through to successful resolution. 
A better end to end service.  
John has a learning disability, poor mobility, and lives alone. He was
supported by a care provider for 24 hours a day with motion sensors in place to
alert the carers when John requires personal care. The motion sensors were not
suitable for John’s needs, and he would often become distressed when they
would activate without any need for a response.   
The Assistive Technology team visited John at home and assessed John’s
needs. It was agreed that John would benefit from the installation of a specialised
bed monitor system. This system allows alerts to be raised to the carers via a
care assist pager. 
The Assistive Technology team trained all care staff who support John on the use
and functionality of the bed monitor and how to acknowledge an alert via the care
assist pager. 
Since the bed monitor has been in place it has given carers the support they
need should an alert be raised and ensures that John’s needs are being met. 
Using technology to live independently. 
Maya is the Digital Manager at a local manufacturing company. She is
looking to introduce digital improvements to assist staff efficiency and
improve customer service. 
Maya applied to the council for grant funding for a digital transformation project,
creating a new media conference room to allow her staff to easily communicate
and connect with clients. She also plans to use the funds to introduce a new
customer relationship management system providing staff with all client
information in one location and enabling them to further develop relationships
with their customers. 
It is expected that these digital improvements will allow the creation of new highly
skilled jobs, provide local apprenticeships, and improve organisational
competitiveness within the industry. 
Using technology to improve 
efficiencies in the business sector.
Remy is looking for assistance with ordering a new bin. He is unsure who
to contact and calls the council’s one number listed on the website. 
His call is answered via an automated service which asks Remy to say or select
which department he wishes to speak too. He is automatically transferred to an
officer in the waste department who is able to assist with his enquiry. This
Gary is a young person, aged 16, living with epilepsy.  He has seizures during
the night.  To ensure his safety, Gary has had to sleep in his parents’
bedroom. 
The Assistive Technology team assessed Gary and his family’s needs and as a
result requested an Epi care device.  The device allows parents to be alerted of
Page 251 of 326

Page 252

9 
approach assists residents with reaching the right department in a quicker and
easier way and enables officers to provide a more efficient response to residents. 
In the future, artificial intelligence will be used to implement chat bot functionality.
Residents will be able to submit their details and the nature of the enquiry. For
simpler enquiries, the chat bot will be able to provide an automated response to
the resident and complex cases will be forwarded to an officer for assistance. 
Improving customer service 
through advances in technology.
seizure activity without having to be in the same room, thereby promoting Gary and
his parents’ privacy and dignity within the family home.   
The Epi care equipment is funded by Health and Social Care in North Lanarkshire. 
Using technology to improve 
quality of life and independent living.  
Figure 4
What it means to be digital to people in North Lanarkshire
Page 252 of 326

Page 253

10 
Roadmap to delivery
Programme of Work to 2028 
The council’s digital journey began in earnest in 2019 and the background to the evolution of the digital strategy is set out in Appendix 1.  Although this
journey has been significantly impacted by the pandemic, it has been kept on a constant path by the vision for a Digital North Lanarkshire set out in the
previous versions of the Digital and IT Strategy.  This has ensured the focus remains on the three pillars that aim to achieve Digital Communities, a Digital
Economy, and a Digital Council. 
Within these three pillars a wide range of activities have been delivered since the first Digital and IT Strategy was established; Appendix 2 summarises the
extent of North Lanarkshire’s digital journey to date. 
The council’s new Programme of Work to 2028 - approved in March 2023 - set out plans for a Digital North Lanarkshire as one of seven priorities to increase
the scale and pace of change and achieve coherence across all areas of work in order to turn the council’s overall ambition of inclusive growth and
prosperity for all in The Plan for North Lanarkshire into a reality.   
Through these seven priorities (summarised in Figure 6 on the next page) the aim is to expand the reach of the impact and ensure council resources are
expended on work that has the biggest impact and where it is needed most, while building evidence that the programmes, projects, and activities
implemented are having a positive effect on the lives of all who live in North Lanarkshire both now and in the future.  The seven priorities are interdependent
and cross cutting and the improved outcomes delivered within each will support and enhance all others as the programme becomes embedded; the priorities
for a Digital North Lanarkshire and One Service underpin the other five priorities and will be key enablers to realising their success. 
Figure 6 (on page 11) sets out the roadmap towards achieving a Digital North Lanarkshire in line with the seven Programme of Work priorities.  This is
supported by a Delivery Plan which is set out in Appendix 3. 
Figure 5
3 pillars of a Digital North Lanarkshire
Page 253 of 326

Page 254

11 
Figure 6
7 priorities in the Programme of Work to 2028
Page 254 of 326

Page 255

12 
Figure 7
Roadmap to a Digital North Lanarkshire
Page 255 of 326

Page 256

13 
Making a difference
Principles and standards 
The achievements to date (summarised in Appendix 2) would not have been possible without the considerable effort of employees from across the organisation.   
The extent of digital transformation that has been required to build the solid
foundations now being experienced should not be underestimated.  Establishing
the foundations for North Lanarkshire’s digital vision represented a significant
shift in mindset and culture in terms of how the council conducts its business and
a greater emphasis on the public interacting and using council services through
digital methods.  While this shift towards digital methods of working benefits
people who interact with the council most, it also enables council employees to
work in a more efficient and effective manner. 
A wide range of different stakeholders and groups (see Figure 8) will continue to
be impacted by digital transformational activity in striving to realise the vision for
a Digital North Lanarkshire.  As such, enabling the people and communities of
North Lanarkshire to thrive in a digital world, while ensuring that no one is left
behind, requires digital to be embedded at the centre of the way the council
operates.   
In practice this means that implementation of the Digital and IT Strategy is
underpinned by six principles that mean people always come first regardless of
the activity being delivered.  The principles are set out in Figure 9 on the next
page and what this means in practice is outlined in Appendix 4. 
1. Employees first 
2. Inclusive 
3. Digital first 
4. Innovative 
5. Flexible 
6. Connected 
The principles for a Digital North Lanarkshire are aligned to the national Digital Scotland strategy, A Changing Nation: How Scotland will Thrive in a Digital
World (2021), which sets out an approach that aims to ensure that Scotland will fulfil its potential and thrive in a constantly evolving digital world.  It includes
a national commitment to tackle digital exclusion by stating that “geography, background or ability should not be barriers to getting online and benefitting
from digital technology”.  
Figure 8
Stakeholders
Page 256 of 326

Page 257

14 
Figure 9
The 6 Principles that underpin the Digital and IT Strategy
Page 257 of 326

Page 258

15 
Approach to channel shifting
A key aspect to realising a Digital North Lanarkshire is to enable more streamlined service delivery through a broader set of channels compared to traditional
delivery models.  This follows the desire to see new services seamlessly blend traditional and digital channels and meet residents where they are to match
their channel preferences and expectations.  As such, an approach to channel shifting in in place to support the service redesign processes (see figure 10).   
Being digital is everyone’s business
By following the well-established principles and standards in place, investment targeted in digital and technological solutions that will be of most benefit to
the people and communities of North Lanarkshire should be focused on making a difference.  What it means for the person - who is in receipt of (or requires
access to) the care, supports, or services they need - should be at the centre of any digital transformation activity.  Practical examples of what it means to be
digital to people in North Lanarkshire are set out in Figure 4.   
To achieve this requires the council to move from doing digital to being digital and being digital is everyone’s business.  This means that employees across
the organisation have a role to play in embedding digital at the centre of the way they and the council operates.  It also requires a wide range of solutions to
develop and control the technology to be deployed along with its usage and interaction with hardware and software.  Technology is central to the delivery of
everyday operational service functions and the management and development of solutions required to support council services in progressing
Figure 10
Approach to channel shifting
Page 258 of 326

Page 259

16 
transformational activities which facilitate delivery of the Programme of Work to 2028.  All individuals, teams, and functions across the council are therefore
instrumental in the provision of solutions that will help to realise the digital vision; this is depicted in Figure 11. 
Figure 11
Being digital is everyone’s business Page 259 of 326

Page 260

17 
Governance and risk
Assurances to support delivery of the vision to achieve a Digital North Lanarkshire 
Implementation of the Digital and IT Strategy is done so in line with the council’s governance arrangements to ensure well informed decision making and
clarity in terms of roles and responsibilities and accountabilities.  From an operational delivery perspective, there are four key aspects which support the
practice of good governance in the drive to achieve a Digital North Lanarkshire.  Ensuring an ongoing commitment to reduce the carbon’s footprint is also a
key requisite for consideration in all areas of work. 
Carbon commitment 
Programmes of work, projects, and
activities to realise the vision for a
Digital North Lanarkshire are
delivered in line with the council’s
carbon commitment set out in the
Climate Plan (Action on Climate
Together).   
Providing digital services that offer
online, anytime access to services
will have a positive environmental
impact across several important
areas such as minimising waste
and recycling, thanks to the limited
need for paper forms.   
The development of a digital
workforce will reduce the council’s
carbon footprint by saving energy
and reducing emissions, because
of decreased work-related travel
and the asset rationalisation
programme.   
Work with suppliers will ensure
green energy is used in the
provision of services to the council
including where cloud solutions are
being provided to the council. 
Purchasing will be prioritised on
equipment with minimum energy
ratings and minimum recycling
content and energy efficient
software.   
Work with the local business
community to improve their
adoption of digital technologies will
also have a positive environmental
impact across North Lanarkshire. 
Figure 12
Governance
and risk Page 260 of 326

Page 261

18 
Conclusion
Systematic and consistent deployment 
For the new Digital and IT Strategy for 2024 to 2027 to successfully realise the vision for a Digital North Lanarkshire, its deployment across the organisation
is critical to ensure that it is systematically deployed and implemented in all relevant areas of the council, it is implemented to its full potential, and it is
understood and accepted by all stakeholders. 
Communication, enabling transformation within existing resources, and enhancing skills are key to the successful deployment of the new Strategy.  As such,
these are key areas for delivery during 2024/25 through the supporting Digital North Lanarkshire Programme of Work.   
Page 261 of 326

Page 262

19 
Appendix 1: The evolution of North Lanarkshire’s digital strategy 
Page 262 of 326

Page 263

20 
Appendix 2: North Lanarkshire’s digital journey 
Digital 
Communities 
Page 263 of 326

Page 264

21 
Digital 
Economy 
Page 264 of 326

Page 265

22 
Digital 
Council
Page 265 of 326

Page 266

23 
Appendix 3: Delivering a Digital North Lanarkshire 
Conduct management and technology research to understand current and future state digital culture for the organisation.
Understand the five steps to change in preparation for digital maturity assessment.
Undertake digital maturity assessment with digital culture, leadership, and knowledge activity group.
Share Health and Social Care digital maturity data with the digital culture, leadership, and knowledge activity group to inform the council's digital maturity assessment.
Consider wider staff survey as a follow-up to the digital skills survey from November 2021 in order to gauge the extent of staff skills and gaps.
Review research and current thinking into digital champions / leaders to understand the skills required for a digital leader in order to build and lead teams, keep people connected and engaged, and drive a culture of innovation, learning, and continuous
improvement and review leadership development programmes to incorporate digital capabilities, including cognitive transformation (thinking differently), behavioural transformation (acting differently), and emotional transformation (reacting differently).
Develop digital leadership core competency guide based on the research results and linked to service requirements.
Set up short life change management group to provide expertise, skills, and knowledge of change across the council and North Lanarkshire in order to develop a toolkit to sit beside the project management framework.
Undertake self-assessment to look at the re-design pieces and feedback reviewed by change management group.
Invest in upskilling the council's workforce to be more digitally capable by creating and developing a self-assessment tool to allow staff to understand their current level of digital skills and undertake further learning as appropriate.
Use the enhanced digital skills of the council's workforce to encourage a culture of a digital-first approach (i.e. thinking of a digital solution) when faced with opportunities or challenges to improve the way of work, which will result in efficiency gains and
improved customer service.
Measure and evaluate impact of whole service / authority transformation change to digitise systems (for example i-trent) to inform future user experience.
Develop systems and portals to enable residents to engage, report, request, and pay for services.
Implement a chat bot functionality to enable residents to receive automated responses or to chat to an advisor.
Implement a customer relationship management system to enable staff to route enquiries to the relevant service and encourage cross service working.
Design and develop artificial intelligence capable of generating text, images, or other media (using generative models) to enable the implementation of chatbot functionality.
Establish a roadmap to identify the redesign requirement for services to support the transition to the council’s future operating model in hubs.
Redesign the council’s purchase to pay system to introduce a standardised approach and enable electronic invoicing.
Develop model to enable customers to sign up for online services and establish required resourcing to increase engagement and usage of online services.
Review and implement technology solutions to support customers with additional needs to ensure there are no barriers to accessing digital services.
Further develop community use of immersive experience pods which enhance digital experiences within a community and beyond and evaluate the impact on community groups.
Develop a model that opens up access to the council's non-personal / non-commercial data in a way that allows anyone to freely access and use the data to inform decision making with the resulting portal enabling greater transparency and
efficiency, and improved used of data.
Implement a Centre of Excellence which will standardise procedures, implement clear governance structures, develop and share best practice, demonstrate value through economies of scale and develop skills and knowledge among partners and
staff.
Create a mature and sustainable culture across the organisation to ensure that digitisation of council services provided to the public successfully transition them to achieve the outcomes specified within The Plan for North Lanarkshire.
Digital culture,
leadership,
and
knowledge
Improved
customer
experience
Ensure accessible data to improve public reporting and transparency, streamline effort involved in request for information processes, and leverage business development opportunities.
Ensure a connected / integrated digital experience to facilitate users to transition to efficient digital and hub-based services and become empowered to be self-managing and digitally active.
Ensure a connected / integrated digital experience to facilitate users to transition to efficient digital and hub-based services and become empowered to be self-managing and digitally active.
Support development of a skilled workforce to foster consistent knowledge, improve digital adoption, and accelerate digital-first business capabilities.
Develop and deploy a self-adapting redesign framework to accelerate digital business transformation of critical council functions.
Create a mature and sustainable culture across the organisation to ensure that digitisation of council services provided to the public successfully transition them to achieve the outcomes specified within The Plan for North Lanarkshire.
2024 2025 2026 2027Digital North Lanarkshire - Delivery Plan 2024 to 2027
Page 266 of 326

Page 267

24 
Implement a new housing and asset management system to improve data management, monitoring, and service delivery across housing.
Implement a new case management and scheduling systems to meet statutory obligations and to improve service delivery and performance management across social care.
Review tools and products currently deployed to support the council’s financial management arrangements, identifying and assessing options for longer-term suitability, as well as opportunities to deploy efficient and effective automation and self-
service.
Implement a leisure and facilities booking systems, including integration with hub place bookings and introduction of compliant and secure payment facilities that accommodate home and agile working arrangements.
Review asset management practices across the organisation, including categorising and consolidating system usage.
Develop a portfolio of existing case management systems across the council and use the results to establish a process and timeline for assessing existing solutions and new requests.
Review current telephony systems and implement a new cloud-based Microsoft Teams integrated solution, incorporating virtual voice and digital assistant functionality.
Develop and implement a strategy for the use of automation and generation artificial intelligence (AI) across the council to define the architectural model of AI use for the council and establish a framework and governance for usage.
Create a catalogue of standardised online technology catalogues to enable council service areas to determine digital solutions matching their requirements and enable self-service, where appropriate.
Create and integrate a framework that enables the use of spatial mapping solutions (i.e. digital representation of the environment) across the application estate.
Implement the procured Wide Area Network solution and associated technical functionality, such as internet breakout services and continued development and deployment of fibre across North Lanarkshire.
Deliver and manage a council-wide public Wi-Fi service.
Identify opportunities to use the Internet of Things technology and establish a framework for use, including an adequate governance model.
Develop and implement a plan to enable internet access for temporary accommodation properties.
Develop a strategy to provide internet access to residents across North Lanarkshire.
Deliver the Smart Park pilot scheme (using Omniled solutions), in order to gather data within the park setting and prepare a business case on whether there are adequate benefits to deploy further.
Develop and deliver community access to the immersive pods (sensory spaces which can be utilised to house the latest sensory technology to provide support, in such areas as mental health and employability) across North Lanarkshire.
Create a digital infrastructure development toolkit and associated processes which enables third party commercial connectivity providers to deliver services across the council.
Create a master data catalogue of all data assets across the council, defining the prime record for each data set/field and supporting data owners to assess quality and data mapping.
Develop and implement a method for services to transition from using paper-based storage to a digital solution for retaining appropriate council information.
Identify digital and IT spend across the council and develop a model to establish whether this is essential and priority spend.
Develop and deploy structures and processes that aid the identification and development of operational innovation and that facilitates beneficial service transformation.
Consider areas in relation to security within the council that can be monitored in terms of service delivery and develop a framework for how performance against these elements could be used to benchmark against the council’s peers.
Review data assets and solutions delivered by or in conjunction with third party providers and develop a plan to ensure that suppliers are consistently assessed and reported upon to enable operational performance to be effectively managed
throughout the duration of any engagement.
Consider the range of cyber security controls, which may be used to manage and secure council data and systems, assess the risk associated with data loss, and create an assessment model to provide meaningful, insightful, and simple
representation of the cyber rating of data control.
Digital first
operations
Performance
optimisation
Enhance security monitoring to maintain effective access and control over council data as the council delivers the anticipated increase in its digital footprint.
Develop an efficient digital and IT cost model to ensure scarce financial resources are aligned to vital enabling technologies.
Ensure single source of data to provide insights and evidence that support decision making and service planning.
Facilitate fibre-enabled innovation to maximise the full potential of Internet of Things (IoT) and Artificial Intelligence (AI) technologies in service delivery.
Ensure useful, secure, compliant, and digital first applications are available to support critical but streamlined service delivery.
2024 2025 2026 2027Digital North Lanarkshire - Delivery Plan 2024 to 2027
Page 267 of 326

Page 268

25 
Appendix 4: Principles to support delivery of the vision for a Digital North Lanarkshire 
Page 268 of 326

Page 269

26  Page 269 of 326

Page 270

27  Page 270 of 326

Page 271

28 
Appendix 5: Supporting frameworks, plans, and sub-policies 
Data Protection Policy
Latest version available: Version 7.0 June 2023
Next review due: March 2025
Information Security Policy
Latest version available: Version 4.0 June 2023
Next review due: March 2025
Records and Information Management Policy 
Latest version available: Version 5.0 June 2023
Next review due: March 2025
To deliver services effectively the council needs to collect,
process, and hold large volumes of information relating to
organisations and individuals. Protecting the
confidentiality and integrity of personal data is a critical
responsibility that is taken seriously at all times.  The
council is exposed to potential fines of up to 20 million
Euros  (approximately £18 million) or 4% of its total
annual turnover, whichever is higher and depending on
the breach, for failure to comply with data protection law. 
The collation and holding of information of any nature
creates a risk of information falling into the hands of third
parties or misuse of the information.  To manage those
risks the council has in place a number of policies. These
are listed in the Information Governance Policy
Framework document and the Data Protection Policy is a
statement that sets out how the council will protect
personal data. It sets out the principles, rules, and
guidelines that informs how the council will ensure
ongoing compliance with data protection laws. 
Information is critical to the council and its employees,
customers, partner agencies, and other stakeholders.
Information systems and physical assets including
supporting processes, networks and equipment must be
protected to ensure the council can continue to operate. 
For the council the aim of information security is to enable
the successful delivery of functions, while finding the right
balance between the benefits and risks to the processing
of information.  How information is handled, processed,
exchanged, and stored  is clearly of importance, as are
the ICT systems that employees have come to reply on. 
Information security must address a range of concerns
including:
• Physical access to electronic and paper-based
information assets.
• Logical access to data, systems, applications, and
databases.
• External and internal access to networks and all other
computing resources including cloud resources.
• Legislation impacting data and IT systems in all council
locations, business units, and teams.
• Compliance requirements and standards set out by
Government, partner organisations, and regulatory
bodies.
• Consumer and employee privacy rights.
• Supply chain security, particularly where a third party
holds or processes information on the council’s behalf. 
This Policy sets the strategic position and lays the
foundations and framework for effective information
security. 
Records management is the process used by the council
to manage the information it holds throughout its lifecycle,
regardless of the format it is recorded in. 
Effective records management is required to support the
council’s core functions, provide authentic and reliable
evidence of council business, and document historical and
cultural activity across North Lanarkshire. 
This Policy:
• Provides a framework for good record keeping practices
and ensuring records are managed effectively and
efficiently, and the council complies with its statutory
and regulatory obligations.
• Develops and encourage a working culture that
recognises and acknowledges the benefits of effective
records management.
• Secures a co-ordinated approach to the management of
the council’s records as a corporate resource.
• Defines responsibilities for records management
throughout the council.
• Ensures that council records are reliable, authentic, and
have integrity.
• Ensures that records are retrievable as required but also
secure so as to prevent unauthorised access, alteration
or destruction.
• Ensures lawful management of records that includes
personal data.
• Supports public rights of access to information.
• Ensures that records of long-term value are identified
and preserved as archives in the council’s collections. 
This Policy applies to all records created or managed by
the council and the North Lanarkshire Licensing Board. 
Page 271 of 326

Page 272

29 
Payment Card Industry Data Security Policy
Latest version available: Version 1.0 June 2023 
Next review due: March 2025
Acceptable Use of ICT Policy
Latest version available: Version 4.0 November 2023 
Next review due: March 2025
Records Management Plan 
Latest version available: 2016
Next review due: June 2022
The council takes credit and debit card payments for a
range of goods and services provided - such as theatre
tickets, special uplifts, council tax and housing rents.
Card payments must be taken in a way that protects the
council and all customers from data breaches and fraud. 
This Policy sets out the controls the council must use to
protect the security of all card payments received and
processed. It makes sure staff handle all card information
securely and comply with all Payment Card Industry Data
Security Standard (PCI-DSS) requirements. 
This policy applies to all users of council IT assets who
process, view, or otherwise handle payment card data
and cardholder details. This includes employees,
councillors, contractors, consultants, temporary agency
staff, modern apprentices, students, volunteers, and any
other authorised third parties.
The council invests substantially in information technology
and communication (ICT) systems that help employees to
work flexibly and efficiently. 
This Policy provides the council’s ICT users with guidance
on the appropriate use of technology including, but not
restricted to, email, internet, PCs / laptops, mobile /
smartphones and tablets, social media and shared
network drives and Microsoft Office 365. It applies to
council devices as well as personal devices when
accessing council systems and data, e.g. NL Life. 
The Policy supports the need to keep the council’s ICT
estate in a safe and effective operational state to ensure
the confidentiality, integrity, and availability of information.
This Policy applies to users of council ICT assets
including employees, elected members, contractors,
consultants, temporary agency staff, modern apprentices,
students, volunteers, and personnel affiliated with third
parties. 
Individuals using the schools' network and public access
through libraries have separate guidelines covering
acceptable terms and conditions of use. Elected Members
have separate guidelines covering various aspects  of
conditions of use.  
Records management refers to all public records,
throughout their lifecycle, from creation and acquisition to
archive and destruction. 
Effective management of information and records
supports efficiency, consistency, and business continuity
and enables the council to deliver a wide range of
services. It ensures that the correct information is
captured, stored, maintained, and used, then destroyed or
preserved in accordance with business need as well as
statutory and legislative requirements. 
Development of a Records Management Plan is required
to comply with the Public Records (Scotland) Act 2011. 
The Act defines public records as all records created by,
or in the possession of, the council to allow it to carry out
its functions and meet its responsibilities. 
This Plan applies to the council and the North Lanarkshire
Licensing Board and sets out current records
management practice measured against the standards
required by the Keeper of the Records of Scotland. 
Council records are managed in three types of records
management systems: 
• Manual filing systems for paper and other physical
records. 
• IT applications and databases for structured electronic
records.
• Electronic Documents and Records Management
Systems (EDRMS) and File Shares for unstructured
electronic records. 
Page 272 of 326

Page 273

30
Appendix 6: Enterprise Architect principles 
Type Ref Principle Description
Business
principles
BP01 Primacy of Principles These principles of information management apply to all ‘services’ within the council.
BP02 Reuse before Buy, before Build Software, platforms, infrastructure and data will be reused wherever possible; purchased as commodity solutions if
necessary and only built if there is a unique requirement that cannot otherwise be met.
BP03 Seek architecture approval All projects and programmes will be subject to architectural approval at key stages throughout the delivery lifecycle.
BP04 Maximise value and benefit to the council Information management decisions are made to provide maximum benefit to the council.
BP05 Compliance with statutory obligations Council data and information management processes comply with all relevant internal and external laws, policies, and
regulations.
BP06
Solution cost must be fully understood and
demonstrate robustness, affordability, and
sustainability
Total Cost of Ownership (TCO) for the expected lifecycle use of the solutions is included into all enterprise architectural change
proposals from the outset.
BP07 Solutions have an owner All solutions must have a named Designated Responsible Owner (DRO) and where appropriate Technical Responsible
Owner (TRO).
Covid-19
BP08 The solution enables service delivery
during Covid-19 Proposals relate directly to enabling and delivering the Councils workforce recovery planning
BP09 Workforce change Proposals consider workforce recovery planning and the Managing Workforce Change Policy,
in particular the transition to a workforce less dependent upon dedicated office space and compatible with home working.
Data
principles
DP01 Data is an asset Data is an asset that has value to the council and other parties and must be managed accordingly.
DP02 Data has an owner Data will have a named Information Asset Owner accountable for the data quality and currency.
DP03 Common data
definitions Data is defined consistently throughout the council, standardised, understandable, and distributed.
DP04 Information security Data is protected from unauthorised use, disclosure, and change.
Application
principles
AP01 Solutions will be usable Applications should be simple to use. The user experience should be such that they can focus solely on business activity.
AP02 Sustainability All applications must be designed to ensure sustainability of use within the council.
AP03 Technology Independence and Certification Applications should be technology independent and operate on a variety of devices.
AP04 Systems will talk to each other Applications will be constructed as a collection of Open Standards based services that use Application Program Interfaces
(API), enabling them to be combined to meet business needs.
Technology
principles
TP01 Use less software Technical diversity is minimised to control cost and complexity.
TP02 Cloud first The council will adopt a cloud first approach to solutions, in the following order of preference.
(1) Software as a Service (SaaS).  (2) Platform as a Service (PaaS).  (3) Infrastructure as a Service (IaaS). 
Page 273 of 326

Page 274

Page 274 of 326

Page 275

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref RMcG Date 14/03/24 
Integration Scheme Review- Post Consultation Update 
From  Ross McGuffie, Chief Officer, Health and Social Care for North Lanarkshire  
E-mail ross.mcguffie@lanarkshire.scot.nhs.uk Telephone 01698 858143 
Executive Summary 
The Integration Scheme is a legally binding document jointly developed by NHS
Lanarkshire and North Lanarkshire Council. The Scheme sets out the local framework
within which the integration of health and social care will be taken forward. The Integration
Scheme was last approved by the Cabinet Secretary on 12th April 2019. 
In line with the normal review timescales, further minor amendments have now been made
to reflect updated processes and structures relating to risk, Support Care and Clinical
Governance, Committees and complaints processes. 
Recommendations
It is recommended that the Policy and Strategy committee: 
(1) Approve the revised Integration Scheme;
(2) Note that the revised Integration Scheme has been subjected to 4 weeks’ public
consultation from 15th January 2024 to 11th February 2024 and is now being
presented back to the Policy and Strategy Committee and NHS Lanarkshire Board
in final form before being submitted to the Cabinet Secretary for approval. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (24) Review and design services around people, communities, and
shared resources
Item 13
Page 275 of 326

Page 276

1. Background 
1.1  The Integration Scheme is a legally binding document jointly developed by NHS
Lanarkshire and North Lanarkshire Council. The Scheme sets out the local framework
within which the integration of health and social care will be taken forward. 
1.2 The Integration Scheme was last approved by the Cabinet Secretary on 12th April 2019. 
2. Report 
2.1 Section 44 of the Public Bodies (Joint Working) (Scotland) Act 2014, notes that “the local
authority and the Health Board must carry out a review of the integration scheme before
the expiry of the relevant period for the purpose of identifying whether any changes to the
scheme are necessary or desirable”. The legislation clarifies the “relevant period” as “the
period of five years beginning with the day on which the scheme was approved. 
2.2  In September 2018 North Lanarkshire Council set out a new vision for the future direction
of the council in ‘We Aspire’. The document set out a plan to revise the Integration Scheme
and transfer the discretionary delegated functions for children, families and justice social
work services to the newly reshaped Education and Families service within the council. 
2.3  Following the review of integration and approval by the respective bodies, the Integration
Scheme was updated and submitted to the Scottish Government for approval. The Cabinet
Secretary approved the integration scheme changes to remove children, families and
justice social work on 12 April 2019. 
2.4 In order to meet the 5-year review timeline, a review and update of the North Lanarkshire
Integration Scheme for 2024 has taken place and an update of the document is attached
for approval.   
2.5 The Integration Scheme for 2024-2029 includes minor amendments to reflect updated
processes and structures relating to risk; Support Care and Clinical Governance;
Committees; and complaints processes. 
2.6 The draft Scheme was reviewed by IJB members at the meeting on 22nd November 2023
and was also presented to the NHS Lanarkshire Board in December 2023. 
2.7  In accordance with the approval received from the Integration Joint Board, Policy and
Strategy Committee and the NHS Board in late 2023, the revised Integration Scheme
underwent a period of public consultation spanning from the 15th of January 2024 to the
11th of February 2024. 
2.8 The consultation process involved the publication of the draft integration scheme on the
publicly accessible North Lanarkshire Health and Social Care Partnership Website.
Furthermore, it was disseminated through various social media channels, and the
consultation document was distributed via email to a diverse audience, including health and
social care professionals, users and caregivers of healthcare and social care services, non-
commercial providers of social housing, third-sector bodies, and locality representatives as
necessitated in the Act. 
2.9  Throughout the consultation phase, only a single response was submitted. This feedback
emphasised the importance of aligning the 4 Council representatives with residents' voting
preferences, rather than solely representing any dominant political party. 
Page 276 of 326

Page 277

2.10 In line with the Act, the four Council members on the Integration Joint Board are approved
via Full Council, as part of the existing process for membership of committees, sub-
committees, panels, working groups and outside bodies. 
2.11 Since the inception of the IJB, there has been cross-party membership through this
approach, so no further changes have been proposed for the Scheme.   
2.12 Now in its final form, the Integration Scheme will be presented to the Integrated Joint Board,
Policy and Strategy Committee, and the NHS Lanarkshire Board for formal approval. Upon
obtaining formal approval, the Scheme will be submitted to the Cabinet Secretary for
endorsement. Subsequent to the endorsement, the revised Integration Scheme will be
made publicly available on the North Lanarkshire Health and Social Care Partnership
website. 
3. Measures of success 
3.1 Measures of success are already in place for Integration Authorities through the national
health and wellbeing outcomes and outcome indicators. 
4. Supporting documentation 
4.1 Appendix 1 – North Lanarkshire Integration Scheme 
4.2  Appendix 2 – Integration Scheme Consultation Process 
Ross McGuffie
Chief Officer – Health and Social Care for North Lanarkshire 
Page 277 of 326

Page 278

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Page 278 of 326

Page 279

Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
A formal 4wk consultation is required before final agreement of the new Integration
Scheme 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g., Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty
(i.e., does it relate to healthcare, housing, or education services for in-Service or
ex-Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 279 of 326

Page 280

Appendix 1
Health and Social Care Integration
North Lanarkshire Integration Scheme 2024 
Version Control
Version  Date
North Lanarkshire  Integration Scheme 2014 V1 April 2014
North Lanarkshire  Integration Scheme 2019 V2  April 2019
North Lanarkshire  Integration Scheme 2024 V3  April 2024 
Page 280 of 326

Page 281

Contents
1. Introduction ............................................................................................................................ 8
2. The Parties ........................................................................................................................... 10
3. Integration Model ................................................................................................................. 10
4. Local Governance Arrangements ....................................................................................... 11
5. Delegation of functions ....................................................................................................... 12
6. Local Operational Delivery Arrangements ......................................................................... 15
7. Corporate Service Support ................................................................................................. 16
8. Supporting Strategic Planning ............................................................................................ 16
9. Performance Measurement ................................................................................................. 16
10. Support, Care and Clinical Governance ........................................................................... 17
11. Clinical and Professional Governance Framework ......................................................... 18
12. Chief Officer ....................................................................................................................... 20
13. Workforce ........................................................................................................................... 21
14. Finance ............................................................................................................................... 22
15. Communication, Participation and Engagement ............................................................. 25
16. Information-Sharing and Data Handling ........................................................................... 25
17. Complaints ......................................................................................................................... 26
18.Claims Handling, Liability and Indemnity .......................................................................... 27
19.Risk Management ............................................................................................................... 28
20.Dispute Resolution Mechanism ......................................................................................... 29
Annex 1 – Delegated Functions .............................................................................................. 31
Part 2- Integrated Services ...................................................................................................... 36
Annex 2 - Part 1 - Functions delegated by the Local Authority to the Integration Joint
Board ........................................................................................................................................ 38
Health and Social Services and Social Security Adjudications Act 1983 ............................ 41
Part 2 -Services currently provided by the Local Authority which are to be integrated ..... 47
Annex 3 – Hosted Services Arrangements ............................................................................ 49
Annex 4 – Health and Wellbeing Outcomes ........................................................................... 50 
Page 281 of 326

Page 282

1. Introduction 
The Public Bodies (Joint Working) (Scotland) Act 2014 (thereafter known as the “Act”) requires
Health Boards and Local Authorities to integrate planning for, and delivery of certain adult
health and social care services. This document sets out the agreement through which NHS
Lanarkshire Health Board and North Lanarkshire Council do this. 
The creation of an integrated partnership required North Lanarkshire Council and NHS
Lanarkshire Health Board to undertake a significant change agenda with the aim of creating
services and supports which build on a solid foundation of success to date. 
The overall aim of the arrangement is the creation and continuation of a partnership which
further improves outcomes for people who use health and social care services and their carers.
Therefore, a primary focus of the partnership will be delivering on the nine National Health and
Wellbeing Outcomes (hereinafter referred to as the “Outcomes”). of: 
• People are able to look after and improve their own health and wellbeing and live in
good health for longer
• People, including those with disabilities, long term conditions, or who are frail, are able
to live, as far as reasonably practicable, independently and at home or in a homely
setting in their community
• People who use health and social care services have positive experiences of those
services and have their dignity respected
• Health and social care services are centred on helping to maintain or improve the quality
of life of people who use those services 
• Health and social care services contribute to reducing health inequalities
• People who provide unpaid care are supported to look after their own health and
wellbeing, including to reduce any negative impact of their caring role on their own
health and wellbeing 
• People who use health and social care services are safe from harm 
• People who work in health and social care services feel engaged with the work they do
and are supported to continuously improve the information, support, care and treatment
they provide
• Resources are used effectively and efficiently in the provision of health and social care
services 
From a North Lanarkshire perspective, our local vision reflects and underpins the higher level
national outcomes. This is evidenced by the progress towards a personal outcomes approach
which involves working with people to jointly agree how we support them to meet their
aspirations and goals in life. Consequently, this drive towards supporting people to meet their
outcomes has resulted in a shared partnership vision based upon: 
“Working together to improve health and wellbeing in the community – with the community” 
In pursuit of this vision, and central to our philosophy, will be the following commitments: 
• We will focus on promoting health improvement and tackling the underlying causes of ill
– health.
• We will continue to develop a health and social care system which is integrated around
the needs of individuals, their carers and family members.
Page 282 of 326

Page 283

• We will be working with people, their carers and families who have a range of complex
support needs to identify the outcomes they want to achieve in life. In doing so, our aim
will be to provide care and support to help them realise these outcomes. 
• We will put the leadership of clinicians and professionals at the heart of service delivery
for people who require support and their carers. 
• We will work with partners in the third and independent sectors to remove unhelpful
boundaries and using combined resources to achieve maximum benefit for patients,
service users, carers and families.
• We will work with a range of agencies and partners to address health and social
inequalities and the subsequent impact of this experienced by people in their
communities. 
The following detail provides information relating to ‘how’ the partnership has been created to
deliver against the national outcomes and intentions of the Act. This integration Scheme is the
vehicle through which assurance is given to North Lanarkshire Council, NHS Lanarkshire Health
Board and the Scottish Government that the intentions of the Act are being delivered by the
Integration Joint Board. 
This Integration Scheme forms the basis of a legal agreement with the Scottish Government and
lasts for a maximum duration of five years, after which point it will be refreshed. However, in
circumstances where there is agreement between the Parties, this Integration Scheme can be
refreshed within an earlier timeframe. 
This Integration Scheme first came into effect in April 2016, with a refresh of the North
Lanarkshire Integration Scheme implemented in April 2019.
Page 283 of 326

Page 284

2. The Parties 
North Lanarkshire Council, established under the Local Government etc. (Scotland) Act 1994 and
having its principal offices at the Civic Centre, Windmillhill Street, Motherwell, North Lanarkshire 
And 
NHS Lanarkshire Health Board, established under section 2(1) of the National Health Service
(Scotland) Act 1978 and having its principal offices at Kirklands Hospital, Fallside Road, Bothwell,
Lanarkshire (together referred to as “the Parties”)
In implementation of their obligations under the Act, the Parties hereby agree as follows: 
Definitions and Interpretation 
“The Act” means the Public Bodies (Joint Working) (Scotland) Act 2014. 
“The Parties” means NHS Lanarkshire Board and North Lanarkshire Council. 
“The Health Board” means NHS Lanarkshire Health Board. 
“The Local Authority” means North Lanarkshire Council. 
“The Scheme” means this Integration Scheme. 
“Integration Joint Board” or “IJB” means the Integration Joint Board to be established by Order
under section 9 of the Act. 
“Members” means Members of the Integration Joint Board. 
“Outcomes” means the Health and Wellbeing Outcomes prescribed by the Scottish Ministers in
Regulations under section 5(1) of the Act. 
“The Integration Scheme Regulations” means the Public Bodies (Joint Working) (Integration
Scheme) (Scotland) Regulations 2014. 
“Integration Board Order” means the Public Bodies (Joint Working) (Integration Joint Boards)
(Scotland) Order 2014. 
“Integration Joint Board, Performance, Finance and Audit Committee” (IJB PFA) means the
committee which the Integration Joint Board has delegated authority for business relating to
performance, finance and audits reports/updates. 
“Strategic Plan” means the plan which the Integration Joint Board is required to prepare and
implement in relation to the delegated provision of health and social care services in accordance
with section 29 of the Act.
3. Integration Model 
In accordance with section 2(3) of the Act, the Parties have agreed that the integration model
set out in sections 1(4)(a) of the Act will be put in place for North Lanarkshire, namely the
Page 284 of 326

Page 285

delegation of functions by the Parties to a body corporate that is to be established by Order
under section 9 of the Act. 
4. Local Governance Arrangements 
a. The Integration Joint Board will be responsible for the strategic planning of the functions
delegated to it and for ensuring the delivery of its functions through the locally agreed
operational arrangements set out within this integration scheme. 
b. The regulation of the Integration Joint Board’s procedures, business and meetings will
follow the IJB’s own standing orders which may include additional matters to those set out
within the Integration Board Order. 
c. The Integration Joint Board and the Parties will collaborate and interact in order to
contribute to the outcomes however the Integration Joint Board, when established, will
have distinct legal personality and the consequent autonomy to manage itself. 
d. There will be eight voting members on the Integration Joint Board comprising four elected
members from North Lanarkshire Council and 4 members from NHS Lanarkshire Health
Board. 
e. The non-voting membership prescribed in the Integration Board Order is as follows; 
• The Chief Officer of the Integration Joint Board; 
• The Chief Social Work Officer of the Council appointed by it in terms of Section 3 of the
Social Work (Scotland) Act 1968; 
• The proper officer of the Integration Joint Board appointed under section 95 of the Local
Government (Scotland) Act 1973(a) i.e. the Chief Finance Officer; 
• A registered Primary Care medical practitioner; whose name is included in the list of
primary medical service performers prepared by the Health Board in accordance with the
regulations made under section 17P of the National Health Service (Scotland) Act 1978. 
• A registered Nurse who is employed by the Health Board or by a person or body with
which the Health Board entered into a general medical services contract
Page 285 of 326

Page 286

• A registered medical practitioner employed by the Health Board who does not provide
primary medical services. 
f. Once the Integration Joint Board is established it must appoint, in addition, at least one
member in respect of each of the following groups in terms of the Public Bodies (Joint
Working) (Integration Joint Board) (Scotland) Order 2014: 
• Staff engaged in the provision of services provided under integration functions; 
• Third Sector bodies carrying out activities related to health or social care in North Lanarkshire; 
• Service users residing in North Lanarkshire; 
• Persons providing unpaid care in North Lanarkshire. 
g. The Integration Joint Board may appoint such additional members as it sees fit. 
h. The responsibility for appointing the Chair and Vice Chair will alternate between the Parties
and the appointments will be made for a period of 3 years. Within this period, each Party
may change its appointment as Chair or Vice Chair at any time and it is entirely at the
discretion of the Party which is making the appointment to decide who it shall appoint. 
i. The term of office of a member of the Integration Joint Board is a maximum of three years.
The Integration Joint Board voting members appointed by the Parties will cease to be
members of the Integration Joint Board in the event that they cease to be a Non-Executive
or Executive member of NHS Lanarkshire or an elected member of North Lanarkshire
Council. At the end of a term of office a member may be reappointed for a further term of
office. 
j. The Chief Social Work Officer, Chief Officer and Chief Finance Officer remain members of
the Board for as long as they hold the office in respect of which they are appointed. 
k. Whilst serving on the Integration Joint Board its members carry out their functions under
the Act on behalf of the Integration Joint Board itself, and not as delegates of their
respective Heath Board or Local Authority. 
l. In accordance with good practice, it is expected that the Integration Joint Board will
establish an audit committee to support the overall governance and scrutiny arrangements.
The Parties recognise that the establishment of any committees by the IJB are a matter to
be determined by the IJB. The North Lanarkshire Integrated Joint Board Performance,
Finance and Audit committee has been established within North Lanarkshire to fulfil this
purpose. 
m. Detailed protocols and reporting arrangements will be established to ensure the Parties and
the Integration Joint Board have free access to all relevant information for the purposes of
planning and decision making. 
5. Delegation of functions 
The functions that are to be delegated by the Health Board to The Integration Joint Board are set
out in Part 1 of Annex 1. These functions are delegated only to the extent that they relate to the
Page 286 of 326

Page 287

listed services. The services to which these functions relate, which are currently provided by the
Health Board and which are to be integrated, are set out in Part 2 of Annex 1. Broadly these are
as follows; 
5.1  Hospital Services 
The functions in relation to the hospital services noted below will be delegated in respect of
adults and children.
5.1.1 Accident and emergency services provided in a hospital;
5.1.2 Inpatient hospital services relating to the following branches of medicine: 
• General medicine;
• Geriatric medicine;
• Rehabilitation medicine;
• Respiratory medicine;
• Palliative care services provided in a hospital; 
5.1.1 Paediatrics;
5.1.2 Psychiatry of learning disability;
5.1.3 Inpatient hospital services provided by general medical practitioners;
5.1.4 Services provided in a hospital in relation to an addiction or dependence on any
substance;
5.1.5 Mental health services provided in a hospital except regionally or nationally
organised forensic mental health services. 
5.2 Community Services
The functions in relation to the community health services noted below will be delegated in
respect of adults. 
• District nursing services;
• Health Visiting;
• Allied health professionals in an outpatient department, clinic, or out with a hospital;
• Public dental services;
• Primary medical services
• General dental services 
• Ophthalmic services;
• Pharmaceutical services;
• Primary care out-of-hours;
• Geriatric medicine;
• Palliative care;
• Community learning disability services;
• Kidney dialysis services;
• Mental health services
• Continence services
• Community paediatrics
• Community children’s services
• School nursing services 
• Services provided by health professionals that aim to promote public health; 
5.2 .1 The functions delegated by the Council to the Integration Joint Board are set out in Part
1 of Annex 2. The services to which these functions relate are set out in Part 2 of Annex 2
and relate to adult services only. 
Page 287 of 326

Page 288

• Social work services for adults and older people 
• Services and support for adults with physical disabilities and learning disabilities
• Mental health services
• Drug and alcohol services
• Adult protection and domestic abuse
• Carers support services
• Community care assessment teams
• Support services
• Care home services
• Adult placement services
• Health improvement services
• Aspects of housing support, including aids and adaptions
• Day services
• Local area co-ordination 
• Respite provision 
• Occupational therapy services
• Re-ablement services, equipment and telecare.  
5.3 Annex 3 sets out arrangements for hosted services. This relates specifically to health
services which span more than one Integration Joint Board and are subject to Integration
Joint Board approval. 
5.4 The Integration Joint Board is a Category 1 responder under the Civil Contingencies Act
2004, as per the amendment to the Act in 2021. This ensures that where there is a risk of
an emergency which will impact functions delegated to the Integration Joint Board, there
will be formal coordinated and appropriate arrangements in place for emergency
planning; information sharing and cooperation with other responders; and joined up
information sharing and advice for the public. The IJB is represented at the Local Resilience
Partnership by the Chief Officer.
Page 288 of 326

Page 289

6. Local Operational Delivery Arrangements
6.1 The Integration Joint Board meets a minimum of four times per year in public and
publishes all agendas, papers and minutes with responsibility for the delivery of integrated
functions as set out in annexes 1,2 and 3 and provides operational oversight of integrated
services delegated to them. It will do this directly for all services except for those noted in 
6.2  The operational role of the Chief Officer is set out within section 8. 
6.3  NHS Lanarkshire will retain direct operational oversight of the acute services as set out in
annexes 1,2 and 3 and will provide information on a regular basis to the Integration Joint
Board about the delivery of these services. 
6.4 The Integration Joint Board is responsible for the development of a Strategic
Commissioning Plan as per Section 29 of the Act. This plan sets out arrangements for
carrying out the integration functions and how these contribute to achieving the
Outcomes as outlined in Annex 4. 
6.5  A locality model has been developed by the Integration Joint Board to underpin the
development of the Strategic Commissioning Plan. 
6.6 From an acute hospital service perspective, operational plans for integrated acute service
delivery are subject to directions from the Integration Joint Board about the exercise of
delegated functions in relation to these services. These will also be informed and directed
by the Strategic Commissioning Plan. 
6.7 The Chief officer is responsible for directly implementing the Integration Joint Board’s
directions to locality delivery on the ground. 
6.8 From an operational and performance management perspective, the Integration Joint
Board/ the Integrated Joint Board Performance, Finance and Audit Committee will receive
regular reports from the chief officer and other responsible officers of the parties on the
delivery of integrated services and will issue directions in response to those reports to
ensure improved performance. This includes a range of thematic reports will include, but
are not limited to, the following; 
• Finance Reports
• Performance against the National Health and Wellbeing Outcomes;
• Regulation and scrutiny activity;
• Inspection Outcomes.
• Support, Care & Clinical Governance reports to be assured of the delivery of safe and
effective services.
• Public Protection reports.
• Engagement and community co-production reports from each of the Locality Management
teams.
• Annual staff governance and workforce planning report.
• Improvement plans and reports.
• Risk reports/management plan. 
6.9 The Act requires the Integration Joint Board to publish an Annual Performance Report by
July of each year.
Page 289 of 326

Page 290

7. Corporate Service Support 
7.1 The Parties will support the work of the Integration Joint Board by supplying all relevant
information, data and corporate support services such as financial, legal, human
resources, IT, planning, risk management, audit, administrative etc. for the Integration
Joint Board to carry out its functions. This will include information on cross boundary flow
into and out with NHS Lanarkshire. 
7.2 The current arrangements for providing corporate support services in respect of delegated
functions and the associated service provision will be reviewed by the Chief Officer and
the responsible officers of the Parties on an ongoing basis. 
8. Supporting Strategic Planning
8.1 As outlined in Section 30(3) of the Act, the Integration Joint Board must have regard to the
effect that their Strategic Commissioning Plan will have on facilities, services or resources
which are used in relation to arrangements set out or being considered to be set out in a
Strategic Plan prepared by another Integration Joint Board. 
8.2  In assessing the health element of this, the NHS Board will provide the necessary activity
and financial data for services, facilities and resources that relate to the planned use of
services provided by other Health Boards by people who live within the area of the
Integration Joint Board. 
8.3 In circumstances where the NHS Board or the Council intend to change service provision of
non-integrated services that will impact directly on the Strategic Commissioning Plan, they
will advise the Integration Joint Board of this. 
9. Performance Measurement 
9.1 Through the development of the Strategic Commissioning Plan, the Outcomes are used to
develop a performance reporting framework which underpins the Plan.  
9.2 The Parties have established an integrated performance reporting framework
which considers and develops a local suite of measures and targets that relate to the
provision of integration functions. The measures and targets are aligned to the Outcomes
and any subsequent guidance/core suit of indicators. The Parties develop the targets,
measures and other arrangements that are devolved to the Integration Joint Board. In
developing this, the Parties share with the Integration Joint Board other relevant NHS
Board and Council targets and measures which the Integration Joint Board must take
account of. 
9.3 The Parties, in conjunction with the Integration Joint Board also consider and develop a list
of targets, measures and arrangements that relate to the functions that are not delegated
which the Integration Joint Board must take account of when it is preparing the strategic
plan. 
9.4 The work in respect of 9.2 and 9.3 takes into account: 
9.4.1 The Outcomes.
Page 290 of 326

Page 291

9.4.2 Delegated performance targets related to the commissioning and delivery
accountabilities of the NHS Board and the Council.
9.4.3 Delayed discharge.
9.4.4 Recovery activity. 
9.4.5 Locally agreed outcomes and targets identified through Community Planning and from
the Local Outcomes Improvement Plan and attributable to Health and Social Care
Outcomes and targets, including Health Improvement, for each of the localities
identified and agreed in line with local needs determined for each population.
9.4.6 The Nationally prescribed core suite of integration indicators. 
9.5  The reporting of information against this suite of indicators is provided by the Parties to the
Integration Joint Board as a means of measuring progress and impact. 
9.6  Where responsibility for the target is shared, the Parties set out in a document the
accountability and responsibility of each of them.   
9.7  Where the responsibility for the targets span integrated and non-integrated services, the
NHS Board, the Council and the Integration Joint Board will work together to produce and
deliver the measures and targets which assess performance. This will be evidenced through
a standing performance item on Integration Joint Board meetings and also picked up
through the Integration Joint Board Annual Performance report. 
9.8  The Integration Joint Board Performance, Finance and Audit Committee which is
accountable to the Integration Joint Board has been established as a decision making body
to provide further scrutiny on matters related to finance, risk, performance and audit
matters.   
10. Support, Care and Clinical Governance 
10.1 The Parties and the Integration Joint Board are accountable for ensuring appropriate
support, care and clinical governance arrangements are in place for their duties under
the Act. 
10.2 The Parties remain responsible for the support, care, clinical and professional
accountability of the services which the Integration Joint Board has directed the Parties
to deliver and for the services delivered in respect of functions that are not delegated to
the Integration Joint Board. 
10.3 The Parties remain individually responsible for the assurance of the quality and safety of
services commissioned from the third and independent sectors in line with the
requirements set out within the strategic plan and any directions issued by the
Integration Joint Board that relate to or have an impact on, integrated and non-
integrated service provision. 
10.4 The Integration Joint Board will have regard to the support, care and clinical framework
that is set out in Section 6.6 when developing and agreeing its strategic plan and
corresponding directions to the Parties. 
10.5  As set out in Section 9 the Integration Joint Board will receive regular reports from
professional leadership members for medical; nursing, AHPs; and Social Work to assure
itself that support, care and clinical governance requirements are being met through
Page 291 of 326

Page 292

these existing arrangements and that safe, effective person centred care is being
consistently delivered. 
11. Clinical and Professional Governance Framework
11.1 The Parties have in place support, care and clinical governance arrangements to provide
assurance that the services that are delivered are safe, effective, person centred and
focussed on personal outcomes. 
11.2  The Parties recognise that the establishment and continuous review of the arrangements
for support, care and clinical Governance and Professional Governance are essential in
delivering their obligations and quality ambitions. 
11.3 In the Health Board this is overseen by the Healthcare Quality Assurance and
Improvement Committee, a committee of the Health Board which supports the Health
Board in its responsibilities, with regards to issues of clinical risk, control and governance
and associated assurance in the area of quality assurance and improvement through a
process of constructive challenge. 
11.4 The Healthcare Quality Assurance and Improvement Committee is responsible for the
development of a strategic approach to quality assurance and improvement across the
Health Board, ensuring that quality standards are being set, met and continuously
improved for clinical activity. It ensures that effective arrangements for supporting,
monitoring and reporting on quality assurance and improvement are in place and
working, demonstrating compliance with statutory requirements in relation to clinical
governance and authorising an accurate and honest annual clinical governance
statement. 
11.5 In North Lanarkshire Council the Chief Social Work Officer holds professional
accountability for social work and social care services. The Chief Social Work Officer
reports directly to the Chief Executive and elected members of North Lanarkshire Council
in respect of professional social work matters. He/she is responsible for ensuring that
social work and social care services are delivered in accordance with relevant legislation
and that staff delivering such services do so in accordance with the requirements of the
Scottish Social Services Council. 
11.6 The Parties are committed to developing a shared support, care and clinical governance
framework for integrated services. The professional leadership of the Parties will work
together to develop and agree this support, care and clinical governance framework. In
the first instance this will be based on a self-assessment exercise to help identify areas of
common practice, provide opportunities to learn from one another and streamline
processes. 
11.7 The existing process, procedures and reporting structures for support, care and clinical
governance of integrated services will be reviewed in light of the agreed support, care and
clinical framework. The framework will encompass the following:
• Professional regulation, workload and workforce development;
• Information assurance;
• Service user experience and safety and quality of integrated service delivery and personal
outcomes;
• Person Centred Care;
• Management of clinical risks; and
• Learning from adverse events.
Page 292 of 326

Page 293

11.8 Each of these domains will be underpinned by mechanisms to measure quality, clinical
and service effectiveness and sustainability. They will be compliant with statutory, legal and
policy obligations strongly underpinned by human rights values and social justice. Service
delivery will be evidence- based, underpinned by robust mechanisms to integrate
professional education, research and development. 
11.9 The Parties and the Integration Joint Board will be asked to approve the framework and
will then be responsible for ensuring that it is embedded within service planning, delivery
and performance reporting mechanisms. The Integration Joint Board will be responsible for
ensuring effective mechanisms for service user and carer feedback and for complaints
handling. 
11.10 The Area Clinical Forum, Managed Clinical Networks, GP Sub Committee, Area Medical
Committee; Medical Staff Committee and any other appropriate professional groups, and
the Adult Protection Committees will provide advice directly to the Integration Joint Board
or through its professional members. 
11.11 The Healthcare Quality Assurance and Improvement Committee and the Chief Social
Work Officer (or his/her delegates) will provide advice, oversight and guidance to the North
Lanarkshire Strategic Planning Group in respect of support, care, clinical and professional
governance, for the delivery of health and social care services and to the localities identified
in the strategic plan. 
11.12 The Chief Officer will have access to professional advice from the Chief Social Work
Officer of the local authority and the Medical Director and the Nursing Director of the
Health Board in both their operational role as a senior officer of the parties and as the
accountable officer to the Integration Joint Board. 
11.13 Explicit lines of professional and operational accountability are essential to assure the
Integration Joint Board and the Parties of the robustness of governance arrangements for
their duties under the Act. They underpin delivery of safe, effective and person centred
care in all care settings delivered by employees of NHS Lanarkshire and North Lanarkshire
Council and of the third and independent sectors. 
11.14 NHS Lanarkshire Board is accountable for Clinical Governance. Professional governance
responsibilities are carried out by the professional leads through to the health professional
regulatory bodies and Scottish Ministers. 
11.15 The Chief Social Work Officer in North Lanarkshire holds professional accountability for
social work and social care services. The Chief Social Work Officer reports directly to the
Chief Executive and elected members of North Lanarkshire Council in respect of
professional social work matters. He/she is responsible for ensuring that social work and
social care services are delivered in accordance with relevant legislation and that staff
delivering such services do so in accordance with the requirements of the Scottish Social
Services Council. 
11.16 The Medical Director and/or the Director of Nursing, Midwifery and Allied Health
Professions, through delegated authority, hold professional accountability for the delivery
of safe and effective clinical services within NHS Lanarkshire and report regularly on these
matters to the Health Board. 
Page 293 of 326

Page 294

11.17 The Integration Joint Board will have three health professional advisors. These
members of the Integration Joint Board will be professionally accountable to the Medical
Director and the Nurse Director as appropriate. 
11.18 This arrangement does not limit the ability of the Medical Director and/or the Nurse
Director to provide advice directly to the Integration Joint Board. Where this advice is
offered, the Integration Joint Board must respond in writing and notify the Parties. The
Chief Social Work Officer can provide advice directly through their membership of the
Integration Joint Board. 
11.19 The Chief Social Work Officer, through delegated authority holds professional
accountability for the delivery of safe and effective social work and social care services
within the Council. An annual report on these matters will continue to be provided to the
relevant Council committee and will also be made available to the Integration Joint Board. 
11.20 The Chief Social Work Officer will provide professional advice to the Integration Joint
Board in respect of the delivery of social work and social care services by Council staff and
commissioned care providers in North Lanarkshire. 
12. Chief Officer
12.1 The Integration Joint Board will appoint a Chief Officer in accordance with section 10 of
the Act. 
12.2 The Chief Officer reports to the Council’s Chief Executive and the NHS Board’s Chief
Executive. The Chief Officer’s formal contract of employment is with one of the Parties and
whichever holds the contract of employment, manages the Chief Officer on a day to day
basis. 
12.3 The Chief Officer will be operationally responsible with regards to the delivery of the
delegated services (as set out in Annex 1 & 2) that do not relate to the acute medicine and
Accident and Emergency services provided for within NHS Lanarkshire Hospitals. These
services will continue to be operationally managed by NHS Lanarkshire, through the
Director of Acute Services, in line with the Integration Joint Board’s Strategic Plan to ensure
coherence across integrated and non-integrated hospital service provision. 
12.4 The Acute Director will be a single point of managerial responsibility for NHS Lanarkshire
hospitals. The Acute Director will provide updates to the Chief Officer on the operational
delivery of integrated functions delivered within the acute hospital and the set aside budget
on a regular basis. 
12.5 The Chief Officer may also have responsibility for managing services that are hosted by the
Integration Joint Board across North and South Lanarkshire. These arrangements will be
determined by the North Integration Joint Board and the South Lanarkshire Integration
Joint Board through the strategic planning process. 
12.6 The Chief Officer will be a member of the Corporate Management Teams of the Health
Board and Local Authority. 
12.7 The Chief Officer will establish a senior management team to oversee day to day
operation of the integrated services. 
12.8 The Chief Officer’s objectives will be set annually. This will form the basis of the Chief
Page 294 of 326

Page 295

Officer’s performance appraisal with the Council’s Chief Executive and the Chief Executive
of the Health Board. 
12.9  The Heads of Service will deputise for the Chief Officer as and when required. At the
request of the Integration Joint Board the Heads of Service will carry out the functions of
the Chief Officer if/when the Chief Officer is absent or otherwise unable to carry out their
functions. 
12.10 The Chief Officer has established and maintains effective working relationships with a
range of key stakeholders across the NHS Board, the Council, the third and independent
sectors, services users and carers, the Scottish Government, trade unions and relevant
professional organisations. 
12.11 Current hosted services arrangements are set out in Annex 3. However, with regards to
the future shaping of these services from a strategic planning perspective, the Integration
Joint Board discusses with relevant neighbouring Integration Joint Boards how these are
shaped now and in the future. The Chief Officer takes direction from the Integration Joint
Board in respect of this. 
13. Workforce
13.1 Human resource services and workforce planning information will continue to be
provided by the appropriate corporate human resource functions within the Council and
NHS Lanarkshire. 
13.2 The Parties, with the involvement of the Chief Officer, will identify appropriate officers to
develop a joint Workforce Development and Support Plan. In doing so the officers will be
required to consider professional views and previous workforce modelling etc. however,
there may be opportunities to adapt these plans when considering an integrated
workforce. This will also have to build in consideration around Third Sector and
Independent Sector capacity. The Workforce Development and Support plan will be
regularly updated to ensure it remains contemporary. 
13.3  An Organisational Development strategy (“OD Strategy”) will be maintained in relation to
teams who will deliver integrated services. Through an intense focus on locality
modelling, locality based focus groups and action learning sets, we have identified
significant potential for harnessing the positivity and enthusiasm of frontline staff to
achieve better outcomes for the public, the organisation and the staff. We intend to
continue this process combined with other aspects of our plan which focuses on;
• Integration Joint Board Development
• Key Leaders Development Programme
• Integrated Locality Team Development
• Wider Stakeholder Development 
13.3.1 In all cases, we will endeavour where appropriate, to carry out development
work which is inclusive of all partners. Considerable progress has been made to develop an
OD strategy, but it will need to be reviewed and revised over time. The Integration Joint
Board will be given the opportunity to provide comment on the draft strategy upon its
establishment. The strategy will be updated over the period of the strategic planning
process. 
13.4 Joint HR/OD processes have been agreed by the Parties over a number of years and many
Page 295 of 326

Page 296

joint policies already exist which will assist in the process of integration. This integration
scheme has no effect on these joint policies so, for example, any joint appointments will
continue to report to one-line manager, except for the Chief Officer where different
provision is made within this scheme. 
14. Finance
14.1 Contributions from the Parties for delegated functions to the Integration Joint Board will
be overseen by the Chief Officer and the Integration Joint Board Chief Financial Officer.
They will develop a resource plan and budget based on available resources. The
Integration Joint Board Chief Financial Officer will be responsible for the preparation of
the annual financial statements as required by section 39 of the Act. 
14.2 The Chief Officer and Chief Financial Officer will develop an integrated budget based on
the Strategic Plan and present it to the parties for consideration as part of both of their
annual budget setting processes. The Parties will evaluate the case for the Integrated
Budget against their other priorities and will agree their respective contributions
accordingly. The outcome of this work will be presented to the Integration Joint Board.
Following on from the budget process, the Chief Officer and the Integration Joint Board
Chief Financial Officer will prepare a financial plan supporting the Strategic Plan. 
14.3 The budget will be evidenced based with transparency of assumptions including, but not
limited to Pay Award, Contractual Uplift, Savings Requirements etc. 
14.4  The method for determining the amount set aside for hospital services will follow
guidance issued by the Integrated Resources Advisory Group and be based initially on the
notional direct costs of the relevant populations use of in scope hospital services as
provided by Information Services Division (ISD) Scotland. The NHS Director of Finance and
Integration Joint Board Chief Financial Officer will keep under review developments in
national data sets or local systems that might allow more timely or more locally
responsive information, and if enhancements can be made, propose this to the
Integration Joint Board. If the Strategic Plan sets out a change in hospital capacity, the
resource consequences will be determined through a bottom up process based on:
• Planned changes in activity and case mix due to interventions in the Strategic Plan;
• Projected activity and case mix changes due to changes in population need;
• Analysis of the impact on the affected hospital budget, taking into account cost-behaviour
i.e. fixed, semi fixed and variable costs and timing difference i.e. the lag between
reduction in capacity and the release of resources. 
14.5  Each partner will agree the formal budget setting timelines and reporting periods as
defined in the Financial Regulations. 
14.6 A schedule of notional payments will be provided by the Parties to the Integration Joint
Board following the approval of the Strategic Plan and the Financial Plan. 
14.7 It will remain the duty of the Local Authority Section 95 Officer and the NHS Board
Accountable Officer to monitor and regulate the financial performance of their respective
share of the resources available to the Integration Joint Board during each reporting
period, throughout the financial year. 
14.8 It will be the responsibility of the Local Authority Section 95 Officer and the NHS Board
Accountable Officer to comply with the agreed reporting timetable and to make available
Page 296 of 326

Page 297

to the Integration Joint Board Chief Financial Officer the relevant financial information,
including the sum set aside in line with 9.4.15, required for timely financial reporting
to the Integration Joint Board. This will include such details as may be required to inform
financial planning of revenue expenditure. 
14.9  The frequency of reporting is set out in the Financial Regulations and will be at least on a
quarterly basis. In advance of each financial year a timetable for financial reporting will
be submitted to the Integration Joint Board for approval. 
14.10 Regular management reports will be prepared in line with the financial regulations which
will be agreed by the Integration Joint Board, and will include actual and projected
outturns. The existing budgetary control frameworks adopted by each of the Parties will
form the basis of generating the required information. 
14.11 The Integration Joint Board Chief Financial Officer will manage the respective financial
plan so as to deliver the agreed outcomes within the Strategic Plan viewed as a whole. 
14.12 The Parties do not expect that there will be a schedule of cash payments, but rather
annual accounting entries for the agreed budgets. There may be a requirement for an
actual cash transfer to be made between the Parties to reflect the difference between
the payment being made and the resources delegated to the party by the Integration Joint
Board. Any cash transfer will take place at least annually. Any change to frequency will be
jointly agreed by the Integration Joint Board and the Parties. 
14.13 The process for managing any in-year financial variations will be detailed within the
Financial Regulations and are summarised below: 
14.13.1 If the Integration Joint Board’s Chief Financial Officer is advised that a significant change
is likely to the Integration Joint Board's overall financial position and the deviation involves
a change of policy of the Integration Joint Board or results in revenue implications for
future years, a report will be provided for the Integration Joint Board in good time detailing
the financial consequences to enable appropriate action to be taken timeously. 
14.13.2 If an overspend is forecast on either partner’s in scope budget, the Chief Officer and
the Integration Joint Board’s Chief Financial Officer will aim to agree a recovery plan with
the relevant partner to balance the overspending budget and determine the actions
required to be taken to deliver the recovery plan. If the overspend arises from assumptions
in the Integration Joint Board’s strategic plan on the impact of service changes that are not
realised as anticipated this should be subject to a report and corrective action. This
corrective action may include a recovery plan which should consider revisions to the
commissioning of services and / or financial plans to account for the changed
circumstances, and the use of any available reserves. 
14.13.3 If the recovery plan is unsuccessful then the parties have the option to:
• the relevant partner provides additional resources to the Integration Joint Board which is
then recovered in future years from subsequent underspends in that partner’s
contribution, (subject to scrutiny of the reasons for the overspend and assurance that
there is a plan in place to address this) or;
• the relevant partner makes additional one-off adjustment to the resources that it is making
available to the Integration Joint Board. 
Page 297 of 326

Page 298

14.13.4 Unplanned underspends that arise due to material differences between assumptions
used in setting the budget and actual events effectively represent an overfunding by the
Parties with respect to planned outcomes. The circumstances surrounding the action
required to address unplanned underspends is set out in the Financial Regulations and
Reserves Policy, which will be subject to agreement by the Parties and the Integration Joint
Board. The options will include the underspend either being returned to the relevant party
in year through an adjustment to their respective contributions, or maintained by the
Integration Joint Board to be carried through the General Fund balance. 
14.14 The Parties do not expect to reduce them in year payment to the Integration Joint Board
without the consent of the Integration Joint Board and the other Party out with the
following circumstances Unplanned underspends as defined above and the Financial
Regulations and Reserves Policy. 
14.15 Where the budget assumed a specific allocation from the Scottish Government which
did not materialise in year to the extent anticipated. (The converse of this also applies in
that should a specific allocation pertaining to a delegated function exceed the anticipated
level, an additional payment to the Integration Joint Board may be agreed). 
14.16 Monitoring arrangements will include the impact of activity on set aside budgets. 
14.17 The Accounting Standards as adapted for the public sector will apply to the Integration
Joint Board. The Code of Practice on Local Authority Accounting in the UK will be the
applicable guidance for their interpretation. 
14.18 The financial statements of the Integration Joint Board will be completed to meet the
audit and publication timetable specified in regulations (Regulations under section 105 of
the Local Government (Scotland) Act 1973). 
14.19 Initially, recording of financial information in respect of the Integration Joint Board will
be processed via the Local Authority ledger. The means for recording financial information
will be reviewed by the Chief Financial Officer to ensure this method remains appropriate
giving due regard to the needs of the Integration Joint Board. Should an amendment to
this method be required the Chief Financial Officer will consult with both parties and
present recommendations to the Integration Joint Board for approval. 
14.20 The financial ledger transactions relating to the Integration Joint Board will be carried
out prior to the end of the financial year with post year-end adjustments for material
information only. Year-end balances and transactions will be agreed timeously in order to
allow completion of the Accounts in line with required timescales. This date will be agreed
annually by the Integration Joint Board and the Parties. 
14.21 From an asset management and capital planning perspective, in the short term, the
Integration Joint Board will not be empowered to own capital assets and the regimes of
the Parties will apply to capital assets used to provide the delegated services. Ownership
of assets and associated liabilities will remain with the Parties. 
14.22 The Chief Officer will consider all of the resources which are required to deliver the
integration outcomes including the relevant non-current assets owned by the Parties. The
Chief Officer will consult with the Parties to make best use of existing resources. 
Page 298 of 326

Page 299

14.23 Should the Integration Joint Board believe there is a requirement to develop assets in
order to facilitate the delivery of the Strategic Plan’s outcomes, then the Chief Officer must
present a business case to the Parties for consideration. This should be submitted as part
of the partner’s capital planning process. Partnership discussion would be required at an
early stage for jointly funded projects. 
14.24 Detailed Financial Regulations governing the Integration Joint Board will be agreed
between the Parties and approved by the Integration Joint Board before functions and
resources are delegated. 
15. Communication, Participation and Engagement
15.1 Communication, participation and engagement with all stakeholders is central to
the development of the Integration Scheme and is stated requirements as outlined in
Section 6 (2) of the Act. The stakeholders who have been directly engaged with to date
include:
• Health & Social Care Professionals;
• Service Users & Carers;
• Non Commercial Providers of Health & Social Care;
• Non Commercial Providers of Housing;
• Independent Sector;
• Third Sector;
• Staff likely to be affected by the integration;
• Other Local Authorities operating within the area of the Health Board. 
15.2 The Parties have well-established local arrangements for involving and engaging with
service users, carers, patients and communities. These have become embedded within North
Lanarkshire and include the Public Partnership Forum.  North Lanarkshire Integration Joint
Board collaborates with the nationally recognised Third Sector Interface, and as such provides
a seat on the IJB in order to develop and coordinate activity with third sector partners. 
15.3 This public engagement activity will adhere to national standards for community
engagement and participation. 
15.4 The Integration Joint Board has an existing participation and engagement plan,
supported via access to the corporate/directorate communication teams of both parties and
a dedicated communications officer and support from staff who work directly in the field of
community engagement/public involvement. 
15.5 In preparing its strategic plan, the Integration Joint Board has established mechanisms
to seek the views of key stakeholders, including a strategic planning group in accordance with
the requirements of the Act. 
16. Information-Sharing and Data Handling
16.1 The Parties agree to continue to operate under the existing Lanarkshire Information
Sharing Protocol and the agreed procedures for sharing information, which is governed by
the Lanarkshire Data Sharing Partnership (LDSP), until such time as any necessary changes
are made by the process outlined below. The Lanarkshire Data Sharing Partnership Board
is the key multi-agency forum with current partnership arrangements and includes
representation from North and South Lanarkshire Councils, the NHS Board, Police Scotland,
Fire Service and Third Sector. All staff employed by the Parties will continue to comply with
all current polices and protocols with regards to information sharing. 
Page 299 of 326

Page 300

16.2 The protocol and procedures for sharing information will be regularly reviewed and
updated to reflect the new governance arrangements that pertain to health and social
care by the Lanarkshire Data Sharing Partnership. The Chief Officer of the Integration
Joint Board chairs the Local Data Sharing Partnership: and the revised protocol has been
provided to the Parties and the Integration Joint Board. 
16.3 The Lanarkshire Information Sharing Protocol is reviewed regularly by the LDSP. If the
Parties or the Integration Joint Board have concerns about the Lanarkshire Information
Sharing Protocol or agreement, or the processes for sharing information, they may
request a review. Any such changes or amendments must be agreed by the Integration
Joint Board and the Parties. 
16.4 It is the intention to ensure that any resultant information sharing agreement will be
established and maintained within legislative or regulatory requirements in place at that
time, primarily with respect to confidentiality, data protection and privacy. 
16.5 The Parties entered into an information sharing protocol (Scottish Accord on the Sharing
of Personal Information – SASPI) in relation to health and social care integration,
primarily to support strategic planning, commissioning and service design. 
17. Complaints
17.1 The Parties agree the following arrangements in respect of complaints by service users
and those complaining on behalf of service users: 
17.2 The Parties agree that feedback, comments, concerns and complaints should be viewed
with a positive attitude and valued as feedback on service performance leading to a culture
of learning from complaints. 
17.3 The Parties agree the principle of frontline resolution to complaints wherever possible
and have existing mechanisms in place to achieve this. 
17.4 The Parties agree that irrespective of the point of contact the Parties will show a
willingness to appropriately direct complaints to ensure an appropriate response. 
17.5 Due to different legislative requirements the Parties agree that complaints will continue
to be dealt with according to the procedures and policies in place for the Local Authority
and the Health Board. 
17.6 Where complaints cross the boundaries of health and social care the Parties will work
together to achieve, where possible, a joint response to a complaint. 
17.7 The Parties agree that complaints by patients, service users or carers will be managed
and responded to by the lead organisation responsible for the delivery of the service to
which the complaint refers in accordance with the procedures and policies in place for that
Party, completed within the timescales for the relevant procedure and monitored by the
Chief Officer. 
17.8 There are two established processes a complaint will follow depending on the lead
organisation, these are the Statutory Social Work Complaints process; and NHS
Lanarkshire’s complaints process. 
Page 300 of 326

Page 301

17.9 These processes, together with the timescales for acknowledgement and response, are
widely publicised by the respective organisations. Complaints to North Lanarkshire Council
can be made through their website1 using the online form or by telephoning the Council.
The arrangements for making complaints to NHS Lanarkshire Health Board are set out on
their website2 or can be made by telephoning NHS Lanarkshire Health Board. 
17.10 External service providers are required to have a complaints procedure in place.
Where complaints are received that relate to a service provided by an external service
provider the lead organisation will either arrange for investigation or refer the complainant
to the external service provider for resolution of their complaint. 
17.11 All complaints will be investigated and responded to according to the lead
organisation’s procedure, completed within the timescales for the relevant procedure and
monitored by the Chief Officer. 
17.12 The Chief Officer will have an overview of complaints related to integrated
functions and will provide a commitment to joint working, wherever necessary, between
the Parties when dealing with complaints about integrated services. 
17.13 If a complaint remains unresolved through the defined complaints-handling
procedure, complainants will be informed of their right to go either to the Scottish Public
Services Ombudsman for services provided by the Health Board, or to the Social Work
Complaints Review Committee following which, if their complaints remains unresolved,
they have the right to go to the Scottish Public Services Ombudsman for services provided
by the Local Authority. 
17.14 This arrangement will respect the statutory complaints-handling processes
currently in place for health and social care services. This arrangement will benefit service
users and carers by making use of existing complaints procedures and will not create an
additional complaint handling process. 
17.15 Data sharing requirements relating to any complaint will follow the Information
and Data sharing protocol set in the Information and Data Handling section of this Scheme. 
17.16 Relevant performance information and lessons learned from complaints will be
collected and reported in line with the Support, Care and Clinical Governance section of this
Scheme. 
17.17 A joint performance report will be produced annually for consideration by the
Integration Joint Board. 
18. Claims Handling, Liability and Indemnity
18.1 The Parties and the Integration Joint Board recognise that they could receive a claim arising
from or which relates to the work undertaken on behalf of the Integration Joint Board. 
18.2 The Parties agree to ensure that any such claims are progressed quickly and in a manner
which is equitable between them. 
18.3 So far as reasonably practicable the normal common law and statutory rules relating to
liability will apply, however it is also noted that decisions relating to claims and liabilities
will also be subject to any requirements, obligations or conditions of any relevant insurance
Page 301 of 326

Page 302

policies held by the Parties. 
18.4 In the event of any claim against the Integration Joint Board in respect of which it is not
clear which Party should assume responsibility, the Chief Officer (or his/her
representatives) will liaise with the Chief Executives of the Parties (or their representatives)
to determine which Party should assume responsibility for progressing the claim. 
18.5 Where a claim has been settled by one of the Parties, and it thereafter transpires that
liability (in whole or in part) should have rested with the other Party, then that Party shall
indemnify the Party that settled the claim. 
18.6 Claims regarding policy and/or strategic decisions made by the Integration Joint Board shall
be the responsibility of the Integration Joint Board. For such claims, the Integration Joint
Board will require to assess the need for, and if appropriate, obtain appropriate insurance
cover. It may also require to engage independent legal advice. 
18.7 If a claim has a “cross boundary” element whereby it relates to another Integration
authority area, the Chief Officers of the Integration authorities concerned shall liaise with
each other until an agreement is reached as to how the claim should be progressed and
determined. 
18.8 Each Party will ensure that appropriate risk financing arrangements are put in place and
maintained, to meet the cost of claims and other associated costs. 
18.9 Claims which pre-date the establishment of the Integration Joint Board will be dealt with
by the Parties through the procedures that were in place prior to Integration. 
19. Risk Management
19.1  The Parties and the Integration Joint Board have an agreed risk management strategy
and methodology in relation to Health & Social Care Integration. The shared strategy and
methodology ensures:
• Identification, assessment, prioritisation and pro-active management of risk related to the
delivery of services, particularly those which are likely to affect the Integration Joint
Board's delivery of the strategic plan;
• Identification and description of processes for mitigating these risks;
• Mechanisms in place for risk sharing between the organisations;
• Agreed reporting standards. 
19.2 The risk management strategy and methodology sets out:
• Roles and Responsibilities for managing risk;
• How the Parties and the Integration Joint Board prepare risk registers, and arrangements
to amend and update such registers;
• Risks that should be reported from the date of delegation of functions and Resources;
• An agreed risk monitoring framework;
• An agreed risk reporting framework to senior management and those charged with
governance;
• An agreed process for sharing risks between partners;
• The process for agreeing changes with the Integration Joint Board;
• Protocols for communication and sharing risk information between the Parties. 
19.3 The Parties and the Integration Joint Board will work collectively to support three risk
Page 302 of 326

Page 303

registers:
• IJB strategic register.
• NHS Lanarkshire operational register for health services, as part of NHS Lanarkshire’s
corporate risk processes.
• NLC operational register for social work services, as part of North Lanarkshire Council’s
corporate risk processes. 
19.4 The Integration Joint Board regularly reviews and updates its Risk Register, with more
detailed analysis through the Performance, Finance and Audit Sub Committee. 
19.5 In addition to the above, the NHS Board, the Council and Integration Joint Board will
consider and agree which risks should be taken from their own risk registers and placed
on the shared risk register. Where these risk change, the NHS Board, the Council and
Integration Joint Board will notify each other of where they have changed. This will be
done formally through the risk register reports to Integration Joint Board and its Finance,
Performance and Audit Sub Committee. 
19.6 A risk sharing form has been agreed with both partners so that joint risks can be
identified and shared timeously. 
20. Dispute Resolution Mechanism
20.1 In the event of a failure by the Parties to reach agreement between themselves in
relation to any aspect of this Scheme or any of the duties or powers placed on them by
the Act then they will follow the process laid out below: 
20.2 Either Party can invoke this Dispute Resolution Mechanism by serving written notice of
their intention to do so on the other Party. Such notice will be deemed to be received on
the day following the issuing of the notice. The date following the issuing of the notice is
herein referred to as “the relevant date”. 
20.3 The Chief Executives of the Health Board and the Local Authority will meet, within 7 days
of the relevant date, to attempt to resolve the issue. 
20.4 If unresolved, and within 21 days of the relevant date, the Parties will each prepare a
written note of their position on the issue and exchange it with the each other. 
20.5 In the event that the issue remains unresolved, representatives of the Parties will
proceed to mediation with a view to resolving the issue. 
20.6 Within 28 days of the relevant date, duly authorised representatives of the Parties will
meet with a view to appointing a suitable independent person to act as a mediator. If
agreement cannot be reached, then a referral will be made to the President of the Law
Society of Scotland inviting the President to appoint a person to act as mediator. The
mediation process shall be determined by the mediator appointed and shall take place
within 28 days of the mediator accepting appointment. 
20.7 Where the issue remains unresolved after following the processes outlined above, the
Parties agree that they will notify Scottish Ministers that agreement cannot be reached. 
20.8 The notification will explain the nature of the dispute and the actions taken to try to
resolve the dispute including any written opinion or recommendations issued by the
Page 303 of 326

Page 304

mediator. 
20.9 The Parties agree to be bound by this determination of this dispute resolution
mechanism.
Page 304 of 326

Page 305

Annex 1 – Delegated Functions 
Part 1
Functions delegated by the Health Board to The Integration Joint Board
Set out below is the list of functions that will be delegated by NHS Lanarkshire to the
Integration Joint Board as set out in the Public Bodies (Joint Working) (Prescribed Health
Board Functions) (Scotland) Regulations 2014. 
Functions prescribed for the purposes of section 1(8) of the Act 
Column A
Enactment conferring function
Column
B
Limitatio
n
The National Health Service (Scotland) Act 1978
All functions of Health Boards
conferred by, or by virtue of, the
National Health Service (Scotland) Act
1978
Except functions conferred by or by
virtue of—
section 2(7) (Health Boards); 
section 2CB(
(Functions outside
Scotland);
of Health Boar
ds 
section 9 (local consultative
committees); 
section 17A (NHS Contracts); 
section 17C
(personal services);
medic
al
or dental 
section 17I (use of accommodation); 
section 17J (Health Boards’ power to
enter into general medical services
contracts); 
section 28A (remuneration for Part II
services); 
section 38
children);
(care of mother
s
an
d
youn
g
section 38A (breastfeeding); 
section 39 (medical and dental
inspection, supervision and treatment
of pupils and young persons); 
section 48 (provision of residential and
practice accommodation); 
section 55 (hospital accommodation on
part payment); 
section 57 (accommodation and
services for private patients); 
section 64 (permission for use of
facilities in private practice); 
section 75A (remission and
repayment of charges and payment of
travelling expenses);
Page 305 of 326

Page 306

section 75B (reimbursement of the
cost of services provided in another
EEA state);
section 75BA (reimbursement of the
cost of services provided in another
EEA state where expenditure is
incurred on or after 25 October 2013);
section 79 (purchase of land and
moveable property);
section 82 use and administration of
certain endowments and other
property held by Health Boards);
section 83 (power of Health Boards
and local health councils to hold
property on trust);
section 84A (power to raise money,
etc., by appeals, collections etc.);
section 86 (accounts of Health
Boards and the Agency);
section 88 (payment of allowances
and remuneration to members of
certain bodies connected with the
health services);
section   98 (charges in respect of
non- residents); and
paragraphs 4, 5, 11A and 13 of
Schedule 1 to the Act (Health
Boards);
and functions conferred by—
The National Health Service (Charges
to Overseas Visitors) (Scotland)
Regulations 1989
;
The Health Boards (Membership
and Procedure) (Scotland)
Regulations 2001/302;
The National Health Service (Clinical
Negligence and Other Risks Indemnity
Scheme) (Scotland) Regulations
2000/54;
The National Health Services (Primary
Medical Services Performers Lists)
(Scotland) Regulations 2004/114;
The National Health Service (Primary
Medical Services Section 17C
Agreements) (Scotland) Regulations
2004;
The National Health Service
(Discipline Committees)
Regulations 2006/330; Page 306 of 326

Page 307

The National Health Service (General
Ophthalmic Services) (Scotland)
Regulations 2006/135;
Page 307 of 326

Page 308

The National Health Service
(Pharmaceutical Services) (Scotland)
Regulations 2009/183; 
The National Health Service (General
Dental Services) (Scotland) Regulations
2010/205; and 
The National Health Service (Free
Prescription and Charges for Drugs
and Appliances) (Scotland)
Regulations 2011/55.
Disabled Persons (Services, Consultation and Representation) Act 1986
Section 7
(Persons discharged from hospital) 
Community Care and Health (Scotland) Act 2002
All functions of Health Boards
conferred by, or by virtue of, the
Community Care and Health
(Scotland) Act 2002. 
Mental Health (Care and Treatment) (Scotland) Act 2003
All functions of Health Boards
conferred by, or by virtue of, the
Mental Health (Care and Treatment)
(Scotland) Act 2003.
Except functions conferred by—
section 22 (Approved medical
practitioners); 
section 34 (Inquiries under section 33:
co-operation);  
section 38 (Duties on hospital
managers: examination notification
etc.);  
section 46 (Hospital managers’
duties: notification);  
section 124 (Transfer to other hospital);  
section 228 (Request for assessment
of needs: duty on local authorities and
Health Boards); 
section 230 (Appointment of a patient’s
responsible medical officer); 
section 260 (Provision of information
to patients); 
section 264 (Detention in
conditions of excessive
security: state hospitals); 
section 267 (Orders under sections 264
to 266: recall);
Page 308 of 326

Page 309

section 281 (Correspondence of certain
persons detained in hospital); 
and functions conferred by— 
The Mental Health (Safety and
Security) (Scotland) Regulations 2005; 
The Mental Health (Cross Border
transfer: patients subject to detention
requirement or otherwise in hospital)
(Scotland) Regulations 2005; 
The Mental Health (Use of Telephones)
(Scotland) Regulations 2005; and 
The Mental Health (England and
Wales Cross border transfer: patients
subject to detention requirement or
otherwise in hospital) (Scotland)
Regulations 2008.
Education (Additional Support for Learning) (Scotland) Act 2004
Section 23
(other agencies etc. to help in exercise
of functions under this Act) 
Public Services Reform (Scotland)
Act 2010 
All functions of Health Boards
conferred by, or by virtue of, the Public
Services Reform (Scotland) Act 2010
Except functions conferred by—
section 31(Public functions: duties to
provide information on certain
expenditure etc.); and 
section 32 (Public functions: duty to
provide information on exercise of
functions).
Patient Rights (Scotland) Act 2011 
All functions of Health Boards
conferred by, or by virtue of, the
Patient Rights (Scotland) Act 2011
Except functions conferred by The
Patient Rights (Complaints Procedure
and Consequential Provisions)
(Scotland)  
Regulations 2012/36. 
Page 309 of 326

Page 310

Part 2- Integrated Services 
Services currently provided by the Health Board which are to be integrated
The functions that are set out in Part 1 are delegated in relation to the services as set
out below and relate to both adults and children. 
Interpretation
1. In this part—
“Allied Health Professional” means a person registered as an allied health professional
with the Health Professions Council;
“general medical practitioner” means a medical practitioner whose name is included in
the General Practitioner Register kept by the General Medical Council;
“general medical services contract” means a contract under section 17J of the National
Health Service (Scotland) Act 1978;
“hospital” has the meaning given by section 108(1) of the National Health Service
(Scotland) Act 1978;
“inpatient hospital services” means any health care service provided to a patient who has
been admitted to a hospital and is required to remain in that hospital overnight, but does
not include any secure forensic mental health services;
“out of hours’ period” has the same meaning as in regulation 2 of the National Health
Service (General Medical Services Contracts) (Scotland) Regulations 2004; and
“the public dental service” means services provided by dentists and dental staff employed
by a health board under the public dental service contract. 
Services
2. Accident and Emergency services provided in a hospital.
3. Inpatient hospital services relating to the following branches of medicine—
(a) general medicine;
(b) geriatric medicine;
(c) rehabilitation medicine;
(d) respiratory medicine; and
(e) psychiatry of learning disability.
4. Palliative care services provided in a hospital.
5. Inpatient hospital services provided by General Medical Practitioners.
6. Services provided in a hospital in relation to an addiction or dependence on any
substance.
7. Mental health services provided in a hospital except regionally or nationally organised
forensic mental health services
8. District nursing services.
9. Services provided out with a hospital in relation to an addiction or dependence on any
substance Services provided by allied health professionals in an outpatient department,
clinic, or out with a hospital.
10. The public dental service.
11. Primary medical services provided under a general medical services contract, and
arrangements for the provision of services made under section 17C of the National Health
Service (Scotland) Act 1978, or an arrangement made in pursuance of section 2C (2) of
the National Health Service (Scotland) Act 1978.
12. General dental services provided under arrangements made in pursuance of section
25 of the National Health (Scotland) Act 1978.
13. Ophthalmic services provided under arrangements made in pursuance of section
17AA or section 26 of the National Health Service (Scotland) Act 1978.
14. Pharmaceutical services and additional pharmaceutical services provided under
Page 310 of 326

Page 311

arrangements made in pursuance of sections 27 and 27A of the National Health Service
(Scotland) Act 1978.
15. Services providing primary medical services to patients during the out-of-hours
period.
16. Services provided out with a hospital in relation to geriatric medicine.
17. Palliative care services provided out with a hospital.
18. Community learning disability services.
19. Mental health services provided out with a hospital.
20. Continence services provided out with a hospital.
21. Kidney dialysis services provided out with a hospital.
22. Services provided by health professionals that aim to promote public health.
23. Health visiting Services – denotes that this is in addition to the statutory list as
outlined in points 8-23 above. 
24. 
Page 311 of 326

Page 312

Annex 2 - Part 1 - Functions delegated by the Local Authority
to the Integration Joint Board
Set out below is the list of functions that will be delegated by North Lanarkshire Council
to the Integration Joint Board. 
Schedule Regulation 2 
Part 1 
Functions prescribed for the purposes of section 1(7) of the Public Bodies (Joint Working)
(Scotland) Act 2014 
Column A
Enactment conferring function
Column B
Limitation
National Assistance Act 1948 
Section 48
(Duty of councils to provide temporary
protection for property of persons
admitted to hospitals etc.) 
Section 45
(Recovery in cases of
misrepresentation or non-
disclosure.).) 
The Disabled Persons
(Employment) Act 1958 
Section 3
(Provision of sheltered employment by
local authorities) 
The Social Work (Scotland) Act 1968 
Section 1
(Local authorities for the administration
of the Act.)
So far as it is exercisable in relation to
another integration function. 
Section 4
(Provisions relating to performance of
functions by local authorities.) 
Section 5
(Powers of Secretary of State.) 
So far as it is exercisable in relation to
another integration function. 
Section
8
(Researc
h.) 
So far as it is exercisable in relation to
another integration function.
Page 312 of 326

Page 313

Column A
Enactment conferring function
Column B
Limitation
Section 10
(Financial and other assistance to
voluntary organisations etc. for social
work.)
So far as it is exercisable in relation to
another integration function.
Section 12
(General social welfare services of
local authorities.)
Except in so far as it is exercisable in
relation to the provision of housing
support services.
Section 12A
(Duty of local authorities to assess
needs.)
So far as it is exercisable in relation to
another integration function.
Section 12AZA
(Assessments under section 12A -
assistance)
So far as it is exercisable in relation to
another integration function.
Section 12AA
(Assessment of ability to provide care.) 
Section 12AB
(Duty of local authority to provide
information to carer.) 
Section 13
(Power of local authorities to assist
persons in need in disposal of produce
of their work.) 
Section 13ZA
(Provision of services to incapable
adults.)
So far as it is exercisable in relation to
another integration function.
Section 13A
(Residential accommodation with
nursing.) 
Section 13B
(Provision of care or aftercare.) 
Section 14
(Home help and laundry facilities.) 
Section 28
(Burial or cremation of the dead.) 
So far as it is exercisable in relation to
persons cared for or assisted under
another integration
function.
Page 313 of 326

Page 314

Column A
Enactment conferring function
Column B
Limitation
Section 29
(Power of local authority to defray
expenses of parent, etc., visiting
persons or attending funerals.) 
Section 59
(Provision of residential and other
establishments by local authorities
and maximum period for repayment of
sums borrowed for such provision.) 
Section 78A
(Recovery of contributions) 
Section 80
(Enforcement of duty to make
contributions.) 
Section 81
(Provisions as to decrees for ailment.) 
Section 83
(Variation of
trusts.) 
Section 86
(Adjustment between authority
providing accommodation etc., and
authority of area of residence.)
So far as it is exercisable in relation to
another integration function. 
The Local Government and Planning (Scotland) Act 1982
Section 24(1)
(The provision of gardening assistance
for the disabled and the elderly.) 
Page 314 of 326

Page 315

Health and Social Services and Social Security
Adjudications Act 1983 
Section 21
(recovery of sums due to local authority where persons in residential
accommodation have disposed of
assets.) 
Section 22
(Arrears of contributions charged on interest in land in England and Wales) 
Section 23
(Arrears of contributions secured over interest in land in Scotland) 
Disabled Persons (Services, Consultation and Representation) Act 1986
Section 2
(Rights of authorised
representatives
of disabled persons.) 
Page 315 of 326

Page 316

Column A
Enactment conferring function
Column B
Limitation
Section 3
(Assessment by local authorities of
needs of disabled persons.) 
Section 7
(Persons discharged from hospital.)
In respect of the assessment of need
for any services provided under
functions contained in welfare
enactments within the meaning of
section 16 and which have been
delegated.
Section 8
(Duty of local authority to take into
account abilities of carer.)
In respect of the assessment of need
for any services provided under
functions contained in welfare
enactments (within the meaning set
out in section 16 of that Act) which are
integration functions. 
The Adults with Incapacity (Scotland) Act 2000
Section 10
(Functions of local authorities.) 
Section 12
(Investigatio
ns.) 
Section 37
(Residents whose affairs may be
managed.)
Only in relation to residents of
establishments which are managed
under integration functions.
Section 39
(Matters which may be managed.)
Only in relation to residents of
establishments which are managed
under integration functions.
Section 40
(Supervisory
bodies.) 
Section 41
(Duties and functions of managers of
authorised establishment.) 
Only in relation to residents of
establishments which are managed
under integration functions
Section 42
(Authorisation of named manager to
withdraw from resident’s account.)
Only in relation to residents of
establishments which are managed
under integration functions
Section 43
(Statement of resident’s affairs.)
Only in relation to residents of
establishments which are managed
under integration functions
Section 44
(Resident ceasing to be resident of
authorised establishment.)
Only in relation to residents of
establishments which are managed
under integration functions
Section 45
(Appeal, revocation etc.)
Only in relation to residents of
establishments which are managed
under integration functions Page 316 of 326

Page 317

Column A
Enactment conferring function
Column B
Limitation
The Housing (Scotland) Act 2001 
Section 92
(Assistance to a registered
for housing purposes.)
Only in so far as it relates to an aid or
adaptation.
The Community Care and Health (Scotland) Act 2002
Section 4
The functions conferred by Regulation
2 of the Community Care (Additional
Payments) (Scotland) Regulations
2002 
Section 5
(Local authority arrangements for of
residential accommodation out with
Scotland.) 
Section 6
Deferred payment of accommodation
costs.) 
Section 14
(Payments by local authorities towards
expenditure by NHS bodies on
prescribed functions.) 
The Mental Health (Care and Treatment) (Scotland) Act 2003
Section 17
(Duties of Scottish Ministers, local
authorities and others as respects
Commission.) 
Section 25
(Care and support services etc.) 
Except in so far as it is exercisable in
relation to the provision of housing
support services.
Section 26
(Services designed to promote well-
being and social development.)
Except in so far as it is exercisable in
relation to the provision of housing
support services.
Section 27
(Assistance with travel.)
Except in so far as it is exercisable in
relation to the provision of housing
support services.
Section 33
(Duty to inquire.) 
Section 34
(Inquiries under section 33: Co-
operation.) 
Section 228
(Request for assessment of needs:
duty on local authorities and Health
Boards.) 
Page 317 of 326

Page 318

Column A
Enactment conferring function
Column B
Limitation
Section
259
(Advocac
y.) 
The Housing (Scotland) Act
2006 
Section 71(1)(b)
(Assistance for housing
purposes.)
Only in so far as it relates to an aid or
adaptation. 
The Adult Support and Protection (Scotland) Act 2007
Section 4
(Council’s duty to make
inquiries.) 
Section 5
(Co-operation.) 
Section 6
(Duty to consider importance of
providing advocacy and other.)
Section
7
(Visits) 
Section 8
(Interview
s) 
Section 9
(Medical examinations) 
Section 10
(Examination of records etc.) 
Section 11
(Assessment
Orders.) 
Section 14
(Removal
orders.) 
Section 16
(Right to remove adult at risk) 
Section 18
(Protection of moved persons
property.) 
Section 22
(Right to apply for a banning
order.) 
Page 318 of 326

Page 319

Section 40
(Urgent
cases.) 
Section 42
(Adult Protection Committees.) 
Page 319 of 326

Page 320

Column A
Enactment conferring function
Column B
Limitation
Section 43
(Membershi
p.) 
Social Care (Self-directed Support) (Scotland) Act 2013
Section 3
(Support for adult carers.)
Only in relation to assessments
carried out under integration
functions.
Section 5
(Choice of options: adults.) 
Section 6
(Choice of options under section
5: assistances.) 
Section 7
(Choice of options: adult carers.) 
Section 9
(Provision of information about self-
directed support.) 
Section 11
(Local authority functions.) 
Section 12
(Eligibility for direct payment: review.) 
Section 13
(Further choice of options on material
change of circumstances.)
Only in relation to a choice under
section 5 or 7 of the Social Care (Self-
directed Support) (Scotland) Act 2013
.
Section 16
(Misuse of direct payment: recovery.) 
Section 19
(Promotion of options for self-
directed support.) 
Carers (Scotland) Act 2016 (b) 
Section 6
(Duty to provide Adult carer support
plan) 
Section 21  
(Duty to set local eligibility criteria) 
Page 320 of 326

Page 321

Column A
Enactment conferring function
Column B
Limitation 
Section 24
(duty to provide support) 
Section 25
(provision of support to carers: break
from caring) 
Section 31
(duty to prepare local carer strategy) 
Section 34
(information and advice service for carers) 
Section 35  
(short breaks services statements) 
Part 2 -Services currently provided by the Local Authority
which are to be integrated 
The services that pertain to the functions in Part 1 and will be delegated are set out
below. 
Social work services for adults and older people 
The functions in relation to social work services for adults and older people noted
below will be delegated. 
a) Services and support for all adults with disabilities and long term conditions;
b) Mental health services;
c) Addiction services;
d) Adult protection;
e) Carers’ services;
f) Community care assessment and planning services;
g) Support services provided by contracted services;
h) Care home services;
i) Intermediate Care Services;
j) Health and wellbeing improvement services;
k) Aspects of housing support, including provision of equipment and
adaptations to people’s homes;
l) Day opportunities and day services;
m) Homecare Services;
n) Supported Living Services;
o) Respite Support;
p) Occupational therapy services;
Page 321 of 326

Page 322

q) Re-ablement services;
r) Smart technology, equipment and telecare. 
Page 322 of 326

Page 323

Annex 3 – Hosted Services Arrangements 
Hosted Services Proposed Arrangements between North and South Lanarkshire Integration
Joint Board. 
Where a Health Board spans more than one Integration Joint Board, one of them might
manage a service on behalf of the other(s). This Annex sets out those arrangements which
the Parties wish to put in place. Such arrangements are subject to the approval of the
Integration Joint Board but will not be subject to Ministerial approval. 
Services to be hosted by the South
Lanarkshire Integration Joint Board 
Services to be hosted by the North
Lanarkshire Integration Joint Board 
Community Dental Services  Care Home Liaison
Diabetes Community Children’s Services 
Health and Homelessness Paediatrics
Palliative Care Dietetics
Primary Care Out of Hours Mental Health and Learning Disability
Traumatic Brian Injury  Psychology
Occupational Therapy  Continence Services
Physiotherapy  Podiatry 
Sexual Health 
Speech and Language 
Substance Misuse 
Prisoner Health Care 
Page 323 of 326

Page 324

Annex 4 – Health and Wellbeing Outcomes 
Outcome 1- People are able to look after and improve their own health and wellbeing and
live in good health for longer. 
Outcome 2- People, including those with disabilities, long term conditions, or who are frail,
are able to live, as far as reasonably practicable, independently and at home or in a homely
setting in their community. 
Outcome 3- People who use health and social care services have positive experiences of
those services and have their dignity respected. 
Outcome 4- Health and social care services are centred on helping to maintain or improve
the quality of life of people who use those services. 
Outcome 5- Health and social care services contribute to reducing health inequalities. 
Outcome 6- People who provide unpaid care are supported to look after their own health
and wellbeing, including to reduce any negative impact of their caring role on their own
health and wellbeing. 
Outcome 7 – People who use health and social care services are safe from harm. 
Outcome 8- People who work in health and social care services feel engaged with the work
they do and are supported to continuously improve the information, support, care and
treatment they provide. 
Outcome 9 – Resource are used effectively and efficiently in the provision of health and
social care services. 
Page 324 of 326

Page 325

Appendix 2 – Consultation Process 
North Lanarkshire Health and Social Care Partnership Integration Scheme 2024-2029
Consultation Process 
Key Meetings Integration Scheme was presented for Consultation 
18th October 2023- 1st Draft of Integration Scheme submitted to the NL H&SCP Integrated
Joint Board Performance, Finance and Audit Committee. 
22nd November 2023- 2nd Draft of Integration Scheme submitted to the NL H&SCP
Integration Joint Board – Draft Approved. 
7th December 2023-  Draft Integration Scheme submitted to North Lanarkshire Council Policy
and Strategy Committee – Draft approved. 
19th December 2023-  Draft Integration Scheme submitted to NL H&SCP Senior Leadership
Team Meeting. 
20th December 2023- - Draft Integration Scheme submitted to NHS Lanarkshire Board
Meeting – Draft approved. 
Public Consultation 
15th January 2024 to 11th February 2024 
The consultation added to the North Lanarkshire Health and Social Care Partnership
Website, NHS Lanarkshire Website, and circulated via social media channels (Facebook and
X). The consultation was also sent to all NHS Lanarkshire and NL HSCP news subscribers
(circa 10k). 
The consultation was emailed to a range of consultees based on North Lanarkshire Health
and Social Care Partnership Strategic Planning Group. 
Consultees included health professionals, users of health care and social care, carers of
users of health care and social care, commercial providers of health care and social care,
social care professionals, staff of health board and local authority, non-commercial providers
of social housings, third sector bodies and locality representatives, as necessitated by the
Act. 
Final Sign Off Process 
14th March 2024 – North Lanarkshire Council Policy and Strategy Committee 
27th March 2024 – NHS Lanarkshire Board Meeting 
27th March 2024 – North Lanarkshire Integration Joint Board
Page 325 of 326

Page 326

Page 326 of 326