Democracy Spraffa

Agenda Document Pack - Policy and Strategy Committee - 19/03/2026

North Lanarkshire Council · 19 March 2026
Back to Policy and Strategy Committee — 19 March 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

10 March 2026 
Members of the 
Policy and Strategy Committee
Chief Executive’s Office
Rachel Blair
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Policy and Strategy Committee is to be held in the
Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Thursday, 19
March 2026 at 14:00 PM which you are requested to attend. 
The agenda of business is attached. 
Rachel Blair
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Mark Hamill
Clerk Telephone: 07811294702
Clerk Email: committee@northlan.gov.ukk 
J Logue, T Fisher, L Roarty, C Barclay, A Beveridge, H Brannan-McVey, A Campbell, T
Carragher, C Costello, M Coyle, K Duffy, W Goldie, D Johnston, J Leckie, H Loughran, M
McBride, C McManus, M McPake, L Nolan, G Robinson, A Smith, A Stubbs, R Sullivan, S
Watson, G Woods.  
Page 1 of 454

Page 2

Page 2 of 454

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000   
Minutes   
Minute of Meeting of Audit and Scrutiny Panel of 4
March 2026
Submit the minute of the Meeting of Audit and Scrutiny
Panel held on 4 March 2026 
7 - 12  
Operational   
3 Delivering the Programme of Works to 2028 -
Achievements to Date
Submit report by the Chief Executive providing an
update on the delivery of the Programme of Work to
2028 and the key achievements to date 
13 - 66 
4 The North Lanarkshire Context, Challenges and the
Next Steps
Submit report by the Chief Executive providing an
interim update on mid-term review of the Programme of
Works, framed by the latest Health Check Indicator
results, the challenges facing the wider local
government environment, and the implications for
delivering North Lanarkshire’s priorities. 
67 - 142 
5 Social Value Framework
Submit report by the Chief Officer (People Resources)
seeking approval of the Council's Social Value
Framework. 
143 - 176 
6 UK Government Local Growth Funding
Submit report by the Chief Officer (Place) providing an
update on the UK Government's Local Growth Fund. 
177 - 188
Page 3 of 454

Page 4

7  Embedding the United Nations Convention on the
Rights of the Child (UNCRC) and Realising
Children’s Rights in North Lanarkshire
Submit joint report by the Chief Social Work Officer
(Education, Families, Justice and Integrated Practice)
and Chief Officer (Legal and Democratic) seeking
approval to adopt a clear best practice policy approach
to the incorporation of the United Nations Convention
on the Rights of the Child (UNCRC). 
189 - 200 
8 Information Governance Policies and Guidance:
Two-yearly Review and Update 2025
Submit report by the Chief Officer (Legal and
Democratic) providing an update on the review of
Information Governance Policies and Guidance and
seeking approval to implement the polices. 
201 - 284 
9 Review of the Council’s Democratic, Committee,
and Decision Making Governance Procedures –
Phase 1 Update and Programme Framework
Submit report by the Chief Officer (Legal and
Democratic) providing an update on the delivery of
Phase 1 (Foundations - Governance Systems and
Access) of the review of the Council's Democratic,
Committee and Decision-Making Governance
Procedures. 
285 - 298 
10  UK Town of Culture
Submit report by the Chief Officer (Community
Operations) advising of the proposal to submit an
application for Cumbernauld to become UK City of
Culture. 
299 - 304 
11  Corporate Booking System – Update of
Implementation
Submit report by the Chief Officer (Community
Operations) providing an update on the implementation
of the Corporate Booking System. 
305 - 310
Page 4 of 454

Page 5

12  Ravenscraig Community Hub
Submit a report by the Depute Chief Executive
outlining the work undertaken in relation to the
development of Ravenscraig Community Hub and the
options appraisal exercise for the provision of
mainstream school provision. 
311 - 336 
13  Civic Theatre & Concert Hall Update
Submit report by the Chief Officer (Assets and
Procurement) providing an update on the current
position with regard to Civic Theatre and Concert Hall
within the Motherwell Civic Centre Complex. 
337 - 350 
14  Risk Management Strategy
Submit report by the Chief Officer (Audit and Risk)
seeking approval of the revised Risk Management
Strategy. 
351 - 396 
15  Corporate Fraud Policy
Submit report by the Chief Officer (Audit and Risk)
seeking approval of the updated Counter Fraud Policy. 
397 - 416  
Financial   
16  Capital Programme
Submit report by the Depute Chief Executive setting
out the annual update on the Council’s Strategic
Capital Investment Programme. 
417 - 446  
Contracts   
17  Contract Award for Postal Services
Submit report by the Interim Chief Officer (Strategy and
Engagement) seeking approval to award the Interim
Contracts for Postal Services for a period of up to 12
months. 
447 - 454 
Page 5 of 454

Page 6

Page 6 of 454

Page 7

AUDIT AND SCRUTINY PANEL – 4 MARCH 2026 
1
Thursday, 4 March 2026 at 2pm. 
A Meeting of the AUDIT AND SCRUTINY PANEL 
PRESENT 
Councillor Watson, Convener; Councillor Kelly (Vice Convener); Councillors Costello, Hughes, Hume, Leckie,
McCrory, M. McCulloch, McLaren and Robinson. 
CHAIR 
Councillor Watson (Convener) presided. 
IN ATTENDANCE 
Chief Officer (Audit and Risk), Chief Officer (Finance and Technology), Chief Officer (Housing and Communities);
Chief Officer (Legal and Democratic), Audit Manager, Corporate Risk Manager, Strategy and Customer
Experience Manager, Strategy, Performance and Data Manager, and Democratic Officer. 
ALSO IN ATTENDANCE 
John Boyd and Pauline Murray, Audit Scotland. 
APOLOGY 
Councillor D. Johnston. 
DECLARATIONS OF INTEREST IN TERMS OF THE ETHICAL STANDARDS IN PUBLIC LIFE ETC.
(SCOTLAND) ACT 2000 
1. The meeting noted that there were no declarations of interest. 
CHANGES TO THE CODE OF PRACTICE ON LOCAL AUTHORITY ACCOUNTING 2025/26 
2. There was a report submitted by the Chief Officer (Finance and Technology): (1) explaining that the
Council's Financial Statements are compiled in accordance with the Code of Practice on Local
Authority Accounting in the United Kingdom, which is based on International Financial Reporting
Standards and also the requirements of the accounting and statutory guidance of the UK Government
and that, further, the Code requires appointed auditors to pay due attention to quarterly bulletins
published by Audit Scotland; (2) highlighting any significant changes to the Code, or guidance in the
technical bulletins, which might impact on the accounting requirements and presentation of the
Council's 2025/26 Annual Accounts, and (3) indicating that the 2025/26 Unaudited Annual Accounts
were due to be submitted to External Audit by 30 June 2026. 
Decided: - 
(1) that the contents of the report be acknowledged; and 
(2) that the actions being taken to ensure the Council submits a fully compliant set of Annual
Accounts to External Audit be recognised. 
Page 7 of 454

Page 8

AUDIT AND SCRUTINY PANEL – 4 MARCH 2026 
2
HOUSING PERFORMANCE UPDATE 
3. There was a report submitted by the Chief Officer (Housing and Communities): (1) detailing a response
in respect to the variance between: (a) the red indicators shown in the housing section of the quarterly
performance assurance review report; and (b) the accompanying narrative for these indicators within
the same report; and (2) providing the supplementary information to ensure performance is considered
with the most up to date context, the future improvement actions to support transparency and a full
understanding of performance outcomes for the service. 
Following discussion, it was requested that a report on reactive repairs appointments be submitted to
the next meeting of the Panel, which was agreed. 
Decided: - 
(1) that the explanation for the difference between the red indicators highlighted on the report,
and the narrative provided in respect of these, be noted; 
(2) that the current position in respect of the indicators where no narrative was provided in the
previous report, be noted; 
(3) that the actions proposed to ensure an explanation of all ‘Red’ indicators is provided in all
future reports be noted; and 
(4) that a report on the non-reporting of reactive repairs appointments be submitted to the next
meeting of the Panel 
AUDITING BEST VALUE IN LOCAL GOVERNMENT - UPDATE 
4. There was a joint report by the Interim Chief Officer (Strategy and Engagement) and Chief Officer
(Legal and Democratic): (1) providing an update on the new national approach to auditing Best Value
which requires the Council to ensure arrangements are in place to secure continuous improve in
delivery the best possible services and outcomes for the public; (2) detailing the priority for the year
four thematic Best Value audit work, and the implication for the Council; and (3) highlighting the role
(in line with the Scheme of Administration) in terms of ensuring the Council continues to secure Best
Value in practice in line with the statutory duty. 
Decided: - 
(1) that the update to the national approach to auditing Best Value, the priority for the year four
thematic Best Value audit work, and the implications for the Council in this respect be noted;
and 
(2) that their role (in line with the Scheme of Administration) in terms of ensuring the Council
continues to secure Best Value in practice in line with the statutory duty be endorsed. 
SCRUTINY WORK PROGRAMME - ANNUAL UPDATE 
5. There was a joint report submitted by the Interim (Chief Officer – Strategy and Engagement) and Chief
Officer (Legal and Democratic): (1) providing an update in relation to the Scrutiny Work Programme,
items reported previously to the panel and scheduled on the Scrutiny Work Programme for the year
ahead; and (2) aiming to ensure the Council fulfils both (a) its statutory Best Value duty (with scrutiny
structure that supports Elected Members in reviewing and challenges performance); and (b) the
principles of good corporate governance (as set out in the CIPFA Delivery Good Governance in Local
Government Framework (2016). 
Decided: - 
Page 8 of 454

Page 9

AUDIT AND SCRUTINY PANEL – 4 MARCH 2026 
3
(1) that the annual update to the composite Scrutiny Work Programme and reporting schedule
for the scrutiny function of the Audit and Scrutiny Panel, as set out in Appendix three to the
report be noted;  
(2) that the role of Panel Members in identifying potential issues for inclusion in the Scrutiny Work
Programme in line with the Assessment and Prioritisation Process (in Appendix two the report)
and the overall approach (in Appendix one to the report) be endorsed, and 
(3) that the Panel continue to carry out their scrutiny role in reviewing and challenging
performance to ensure the Council fulfils its statutory Best Value duty. 
PERFORMANCE REPORTING SCHEDULE - QUARTERLY PERFORMANCE ASSURANCE REVIEW 
6. There was submitted a joint report by the Interim Chief Officer (Strategy and Engagement) and Chief
Officer (Legal and Democratic): (1) providing the Panel with the outcome of the latest quarterly
performance assurance review which was undertaken on performance reports submitted to Council
Committees during Cycle Four of 2025; and (2) attaching, as Appendices to the report: (a) Chief Officer
individual performance reviews submitted to Service Committees in line with the Strategic
Performance Framework; and (b) Chief Officer Service specific reporting which takes place each year
to meet business and/or statutory obligations. 
Decided:  that the composite overview of performance reporting provided in Appendices one
and two to maintain an awareness within the latest Performance Reporting Schedule
be noted. 
PROJECT MANAGEMENT FRAMEWORK QUALITY ASSURANCE - ANNUAL REPORT 
7. There was submitted a joint report by the Interim Chief Officer (Strategy and Engagement) and Chief
Officer (Legal and Democratic): (1) advising that the delivery of the Plan for North Lanarkshire is
subject to Quality Assurance arrangements in line with the corporate Project Management Framework;
and (2) aligning the governance support the Programme of Work to ensure the Council can (a)
demonstrate compliance with the Project Management Framework; and monitor delivery of
programmes, projects and activities supporting the Programme of Work. 
Decided: - 
(1) that the rolling review programme now well established to support the Quality Assurance
arrangements be acknowledged; 
(2) that the analysis of the latest position as at January 2026 which provides assurances that the
Council has adopted suitable review procedures and the independent reviews being
undertaken during a project’s life cycle are adding value be noted, and 
(3) that the role of the Panel set out if the next steps at paragraphs 2.6 and 2.7 to support ongoing
oversight and assurance be noted. 
AUDIT AND RISK RELATED ITEMS: ACTION LOG 
8. There was submitted a report by the Chief Officer (Audit and Risk): (1) enabling the Panel to track
implementation of requests and recommendations made by it in respect of Audit and Risk related
items; and (2) attaching, as an Appendix to the report, the action log, recording the requests and
recommendations by the Panel, and when these had been addressed and/or were expected to be
addressed. 
Decided:  that the report be noted. 
Page 9 of 454

Page 10

AUDIT AND SCRUTINY PANEL – 4 MARCH 2026 
4
INTERNAL AUDIT: PROGRESS REPORT 
9. There was submitted a report by the Chief Officer (Audit and Risk): (1) providing an overview of Internal
Audit activity and reporting the results of Internal Audit outputs finalised since the last update to the
Panel in November 2025; (2) highlighting the progress with the 2025/26 Internal Audit Plan; and (3)
providing an update on performance management. 
During discussion on this matter, a question was asked in respect of which Officer committed to
respond outwith the meeting: 
“Can you clarify how many volunteers require and already have PVGs, how these will be recorded
internally and the arrangements to be put in place to ensure records are and remain up to date?” (Cllr
Robinson). 
Following discussion, it was agreed that an update report in relation to the aforementioned question
be submitted to the next meeting of the Panel. 
Decided: 
(1) that the content of the Internal Audit reports together with the associated management
responses be noted; 
(2) that the Internal Audit report to future meetings of the Panel on the progress in implementing
agreed management actions categorised as ‘High’ or ‘Medium’ priority be acknowledged; and 
(3) that an updated report on PVGs be submitted to the next meeting of the Panel. 
INTERNAL AUDIT: FOLLOW-UP OF IMPLEMENTATION OF AUDIT RECOMMENDATIONS 
10. There was submitted a report by the Chief Officer (Audit and Risk): (1) detailing the extent to which
management had implemented actions previously committed to in response to recommendations
contained within Internal Audit reports, where those actions were due to be completed in the period
up to 31 December 2025; (2) advising that Internal Audit had concluded that of the 27 actions agreed
in response to relevant Internal Audit recommendations during the period 12 had been fully completed,
and of the 15 recommendations that remain outstanding, two have an implementation date which are
more than 12 months overdue; (3) explaining that of the 20 actions due in respect of external outputs,
seven had been completed, four had been partially implemented, one is no longer relevant and eleven
were not due yet; (4) attaching, in Appendix one to the report, the register of outstanding Internal Audit
Recommendations; (5) advising that since April 2021, 94% of all relevant audit recommendations have
been satisfactorily implemented by Services, meaning that only 6% of these audit recommendations
remain outstanding; and (6) enclosing in Appendix two to the report, External Audit recommendations
transferred to risk register. 
Decided: 
(1) that the contents of the report be noted. 
RISK MANAGEMENT UPDATE 
11. There was submitted a report by the Chief Officer (Audit and Risk): (1) providing an overview of the
Corporate Risk Register and developments on Corporate Risks since the last update to the Panel in
November 2025; and (2) summarising the key considerations of the Risk Management Corporate
Working Group within the reporting period. 
Decided: 
Page 10 of 454

Page 11

AUDIT AND SCRUTINY PANEL – 4 MARCH 2026 
5
(1) that the Corporate Risk Register as detailed in Appendix one to the report, be noted; 
(2) that that the changes to corporate risk assessments in sections 2.2 to 2.4 of the report, be
noted; 
(3) that the overview of high scoring service level risk as set out in Appendix two to the report and
described in section 2.25 of the report be noted; 
(4) that the Corporate Risk Benchmarking detailed in Appendix three and as described at section
2.6 of the report, be noted; and 
(5) that the summary of other risk management developments as noted at section 2.8 of the
report, be noted. 
AUDIT SCOTLAND – ANNUAL AUDIT PLAN 2025 – 26 
12. There was submitted a report by the Chief Officer (Audit and Risk): (1) presenting the Annual Audit
Report produced by the Council's appointed External Auditors, Audit Scotland; and (2) attached, as
Appendix one to the report, the External Auditor's 2025-26 Annual Audit Report which summarises
the audit work completed and presenting the main findings arising from the audit and containing audit
recommendations and responses, including planned actions, which had been agreed by management. 
(1) that the External Auditor's 2024-25 Annual Audit Report be noted; and 
(2) that monitoring of the implementation by management of actions agreed in response to
External Audit's recommendations be undertaken through reports to the Panel from Internal
Audit. 
Page 11 of 454

Page 12

Page 12 of 454

Page 13

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref DM/SL Date 19/03/26 
Delivering the Programme of Work to 2028 - achievements to date 
From  Des Murray, Chief Executive  
E-mail murraydes@northlan.gov.uk 
Executive Summary
The Plan for North Lanarkshire, established in 2019, set a clear vision of inclusive growth
and prosperity for all, aiming to bring equal benefits and a fairer distribution of wealth to all
North Lanarkshire’s people and communities. 
Delivering this vision through the Programme of Work means transforming North
Lanarkshire’s places, improving local environments, and integrating policies, services, and
systems to respond to growing social complexity and improve outcomes for the people and
communities of North Lanarkshire.   
Approved in March 2023, the Programme of Work to 2028 set out improvements for
delivery across seven priorities - Transforming Places, Invest in North Lanarkshire,
Sustainable Futures, Resilient People, Brighter Futures, Digital North Lanarkshire, and
One Service. By aligning council and partnership activity around a set of inter-related
deliverables (approved in September 2023), the council aims to accelerate transformation
and deliver meaningful change for local people. 
Delivery of the programmes, projects, and activities within the Programme of Work is
overseen by Strategic Boards through a consistent corporate monitoring process across
all seven priorities. Appendix 1 provides a summary of delivery to date, with recent key
highlights outlined below. 
• The highest ever breastfeeding rates recorded for North Lanarkshire show 53.3% of
babies being breastfeed at the first review (10-14 days old) and 35.6% at the 6-8 week
review. Over 900 organisations have joined the Breastfeeding Friendly Scotland
scheme, helping normalise and support breastfeeding across communities and giving
every baby the best start in life.
• Major progress on new community hubs with Orbiston’s main building now operational,
and four additional hubs on track for delivery by the end of 2026. 
• £1.4m National Lottery Heritage Funding secured to restore and redevelop Airdrie
Library, strengthening connections between communities and their heritage. Work will
include enhancing the display of existing museum collections, improving accessibility,
and helping visitors deepen their understanding of Airdrie’s history.
• Completion of the phase 1 towers reprovisioning programme (1,550 flats), with
demolitions progressing to make way for new modern homes. Phase 2 is advancing
well, with 47% of the 964 properties empty.
• New supply programme delivery increasing to 2,588 to further support the regeneration
Item 3
Page 13 of 454

Page 14

of local communities and town centres, create jobs, and boost the local economy.
• New vocational hub opening at Our Lady’s High School, offering practical skills,
industry-recognised qualifications, and enhanced support for young people, including
those with additional needs or care experience. 
• The DataVita - CoreWeave announcement positioning North Lanarkshire as a potential
UK leader in the data and digital economy, establishing one of the world’s most
advanced AI sites within a newly designated UK AI Growth Zone. 
• Continued strong economic performance, with Gross Value Added up 12.5%, business
numbers rising to 8,515, and significant growth in construction and retail. 
• Significant housing improvements, including 278 new energy-efficient council homes,
293 under construction, and 92 purchased to support housing need and prevent
homelessness. Over £59m investment in upgrading existing homes and more than
6,000 energy-efficiency measures delivered.
• Ongoing community engagement to shape key strategies and programmes of work,
including consultation on the new draft Local Transport Strategy to improve connectivity,
enhance accessibility, and create a more efficient and inclusive transport network for
residents and visitors, and the draft Open Space Strategy which sets out how parks,
play areas, and green spaces will be protected, improved, and developed for the future.
• A positive Best Value audit report, with the Accounts Commission recognising the
council’s bold vision, strong partnerships, and focused Programme of Work which is
delivering real improvements for people and communities - noting this is underpinned
by sound financial and performance management and meaningful community
engagement. 
Next steps developments include:
• Delivery of four new community hubs - St Kevin's Community Hub in Coatbridge,
Gartcosh Community Hub in the Northern Corridor, St Stephens Community Hub in
Coatbridge, and Chryston High extension and third sector early years creation in the
Northern Corridor - all due for completion by the end of 2026. 
• The proposed £8.2billion investment through the DataVita - CoreWeave announcement,
subject to planning permission, which could create up to 3,400 direct jobs and potentially
as many as 7,000 jobs in the wider area.  With a £543 m community fund, the plans
have the potential to secure significant long-term value and benefits for local people,
communities, and the future prosperity of North Lanarkshire. 
• Redevelopment work on Airdrie Library with structural replacement, full accessibility
improvements, a new observatory platform, expanded spaces, and enhanced museum
displays.
• Next stage progress on the phase 2 towers reprovisioning programme, with the first
demolitions scheduled to take place in the spring of 2027.
• Next steps following the planning applications which have been submitted for the East
Airdrie Link Road and new University Hospital Monklands which will allow for co-
ordinated delivery, including new connections, bridges, and improved access routes.
• Publication of the council’s 10-year Business and Industry Strategy alongside new
investment as more businesses establish or expand their operations in North
Lanarkshire.
• Implementation of the 2026-28 Local Housing Strategy, which sets out the long-term
ambitions for sustainable and inclusive housing and communities. 
Since its inception, the Programme of Work has provided a clear and stable strategic
direction for the council, delivered through a one council approach focused on transforming
North Lanarkshire and improving people’s lives. The achievements highlighted in this
report, and in previous six-monthly updates to the Committee, demonstrate the significant
pace of change that is taking place across local communities - helping to create the
conditions for learning, opportunity, and wellbeing, and strengthening North Lanarkshire’s
position as a place to live, learn, work, invest, and visit.
Page 14 of 454

Page 15

1. Background 
1.1  Members of the Policy and Strategy Committee are well versed in The Plan for North
Lanarkshire and its vision for North Lanarkshire to be a place of inclusive growth and
prosperity for all which brings equal benefits and a fairer distribution of wealth to all
North Lanarkshire’s people and communities. 
1.2 As the delivery vehicle for The Plan for North Lanarkshire, the Programme of Work has,
since 2019, provided a stable yet flexible framework for delivering The Plan for North
Lanarkshire, supporting effective management of complex, inter-connected
programmes, projects, and activities. The continued commitment of the Policy and
Strategy Committee to the one plan approach has driven significant progress and
enabled meaningful transformation across North Lanarkshire. 
1.3 Following Policy and Strategy Committee approval of the Programme of Work to 2028
and its subsequent deliverables, the focus for The Plan for North Lanarkshire is on
further embedding a single, integrated one place, one plan, one council approach. This
unified direction is essential to increasing scale and impact, accelerating place-based
transformation, and delivering sustainable improvements for the people and
communities of North Lanarkshire. 
1.4 Delivery of the Programme of Work to 2028 continues to be monitored through the
Single Integrated One Council Delivery Plan and established governance
arrangements. The Policy and Strategy Committee maintains strategic oversight of the
Programme, including “development, co-ordination, and monitoring of The Plan for
North Lanarkshire” and keeping under review such “programmes as the Committee
considers necessary to achieve the council’s long-term aims and objectives”. This role 
includes strategic oversight of transformation projects and activities. 
This ongoing transformation continues to be enabled by consistent decisions of the Policy
and Strategy Committee and the wider committee structure, whose support has allowed
the Programme of Work to progress at pace while maintaining the financial sustainability
of the council. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Take cognisance that this report provides a six-monthly update on progress in
delivering the Programme of Work to 2028,  in line with the Committee’s strategic
oversight and the commitment made in March 2024, 
(2) Endorse the ongoing role of the Policy and Strategy Committee in supporting delivery
of The Plan for North Lanarkshire through the Programme of Work, and 
(3) Continue to provide strategic oversight of the transformation projects and activities
that underpin the Programme of Work, ensuring their ongoing development, co-
ordination, and monitoring.
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work All Programmes of Work
Page 15 of 454

Page 16

1.5 This report provides the latest progress update on delivery of the Programme of Work
to 2028 for the strategic oversight of the Policy and Strategy Committee. Key
performance and delivery highlights are outlined in the executive summary, with further
details provided in Appendix 1. 
2. Monitoring delivery of the Programme of Work to 2028 
2.1 Throughout 2024/25 and into 2025/26, the Single Integrated One Council Delivery Plan
has been monitored quarterly by the Programme of Work Strategic Boards through a
consistent corporate process across all seven priorities. Project Managers and Activity
Leads provide updates assessing progress across six dimensions - scope, cost /
budget, quality, resources, risk, and within time / on schedule - along with a
percentage-completion status for each project or activity. 
2.2 Appendix 1 provides an overview of progress in delivering the Programme of Work
priorities, summarising performance against the high-level deliverables approved by
the Policy and Strategy Committee in September 2023. The RAG status reflects
progress across the six dimensions outlined in paragraph 2.1. The latest position is
summarised below. 
• 93% of all actions in the delivery plan supporting the high-level deliverables have
commenced to the initial stages, 7% are not yet due to start. 
- 36% of all delivery plan actions are complete or at the final closure stage (an
increase from 30% as at the progress report in September 2025).
- 89% of all delivery plan actions have reached the delivery and ongoing
management and monitoring stage (an increase from 83% as at the progress
report in September 2025).   
• In terms of delivery within the six dimensions (i.e. scope, cost / budget, quality,
resources, risk, and within time / on schedule) - of those commenced:
- 38% of delivery plan actions have been assigned a Blue RAG status.  
- 55% of delivery plan actions have been assigned a Green RAG status.
- 7% of delivery plan actions have been assigned an Amber or Red RAG status
(for these actions additional commentary is included in Appendix 1). 
2.3 A formal change process supports Strategic Board oversight of the Programme of
Work, ensuring the Policy and Strategy Committee is informed of changes to the
deliverables originally approved in September 2023, with changes noted in Appendix
1. 
Next steps 
2.4 Looking ahead, it is essential that the Programme of Work continues to provide the
stable strategic direction and one council approach needed to drive transformation
across North Lanarkshire. The latest results for the 28 Health Check Indicators show a
strong 68% improvement over the period of The Plan for North Lanarkshire, reflecting
clear progress, although wider pressures continue to create fragility. The accompanying
report (setting out the latest North Lanarkshire, context, challenges, and next steps)
provides an update on the mid-term review to ensure the Programmer of Work remains
current, relevant, and deliverable, with next steps scheduled to be presented to the
Policy and Strategy Committee in cycle 2 of 2026. 
2.5 Quarterly progress monitoring will continue to be carried out by each Programme of
Work Strategic Board to ensure effective oversight and management of delivery against
Page 16 of 454

Page 17

the six dimensions, alongside assessment of overall completed status. Six monthly
progress update will continue to be reported to the Policy and Strategy Committee. 
2.6 Future Programme of Work reports will also include reporting of benefits realised, to
demonstrate the successful delivery of intended outcomes and further support
implementation of recent audit recommendations. 
3. Measures of success 
3.1   Measures of success will be demonstrated through progress in delivering the
Programme of Work and ensuring that the council’s portfolio of programmes, projects,
plans, and activities has a positive impact on the North Lanarkshire context, as
evidenced by the 28 Health Check Indicators. This will support achievement of the
long-term vision of inclusive growth and prosperity for all, as set out in The Plan for
North Lanarkshire. 
4. Supporting documentation 
4.1 Appendix 1 - Summary of progress in delivering the Programme of Work to 2028. 
Des Murray
Chief Executive 
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐
Page 17 of 454

Page 18

If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
The legal impact in this report is only in relation to supporting demonstration of the
council’s compliance with the relevant legislation listed below.  It does not introduce
new legal duties or changes to the council’s statutory duty in this respect.
• The Local Government Act 1992 established the role of the Statutory Direction
to direct the “publication of information as to standards of performance”. 
• The Local Government in Scotland Act 2003 which introduced the duty of Best
Value; this requires that councils “make arrangements to secure continuous
improvement in performance”.  
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Page 18 of 454

Page 19

Work to ensure ongoing monitoring of Programme of Work delivery and assess if
delivery is within the dimensions of scope, cost / budget, quality, resources, risk,
within time / on schedule, and % completed status - and ensure that all
stakeholders are informed of progress in line with their respective oversight role -
contributes towards mitigating the risks on the Corporate Risk Register for the
governance, leadership, and decision making risk and the risk in relation to delivery
of the approved programme of work.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 19 of 454

Page 20

Appendix 1 
Summary of progress in delivering the Programme of Work to 2028 
Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
Transforming Places [ overall completed status = 23% ]
Town and
community hubs
Complete 6 new build Town and
Community Hubs and a £35m
extension to Chryston High,
transforming and creating key
assets, through the replacement
of schools with hubs within the
heart of local communities.  
Mar-23 Mar-27 Green At delivery and
ongoing
management
and monitoring
stage.
All 5 of the projects / activities within this deliverable are underway:
• Orbiston Community Hub in Bellshill - the main building is complete and
operational. Contractor now working on demolishing the old buildings
and landscaping, expected to be complete late 2026.
• St Kevin's Community Hub in Coatbridge - construction is underway,
expected to open in April 2026.
• Gartcosh Community Hub in the Northern Corridor - construction is
underway, with an expected completion date of September 2026.
• St Stephens Community Hub in Coatbridge - construction is underway,
completion expected October 2026.
• Chryston High extension and third sector early years creation in the
Northern Corridor - under construction, with phase one completion
expected November 2026.
New supply
programme
Deliver 2,000 new council
homes between 2023 and 2028
and a further 2,354 by 2035 to
help meet housing need and
support town centre and
community regeneration. 
Apr-23 Mar-35 Green At delivery and
ongoing
management
and monitoring
stage.
The new supply programme continues to deliver on the range of projects
and activities within this deliverable, bringing the total number of new
homes delivered as at February 2026 to 2,588.  
As at February 2026:
- 1,328 new homes have been delivered by the council’s new build
programme.
- 959 homes have been delivered by the open market purchase scheme. 
- 363 homes have been delivered through off the shelf acquisitions since
2023. 
Regular progress updates in respect of new supply programme delivery
continue to be reported to the Housing Committee with the most recent in
November 2025 (link), this included an update on new supply community
benefits (link).
Local
Development
Plan
Develop a new Local
Development Plan to support
and facilitate future development
in the right locations to help
attract investment in new homes
and businesses and support
sustainable communities and
employment. 
Jan-24 Jun-28 Green At delivery and
ongoing
management
and monitoring
stage.
2 of the 6 projects / activities within this deliverable are currently underway.
The remaining activities are not scheduled to begin until the draft plan has
been developed and approved through the gate check process.
• North Lanarkshire Local Development Plan 2 (NLLDP2) - work is
underway to prepare the next statutory plan which will set out the
council’s policies and proposals for land use and development across
North Lanarkshire. The preparation timeline is defined within the
Development Plan Scheme and Participation Statement, with adoption
Page 20 of 454

Page 21

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
of NLLDP2 anticipated in 2027/28.
• Evidence papers - a suite of topic papers was published on the council’s
website as part of the 2025 consultation. Ongoing evidence-gathering,
stakeholder workshops, and engagement with key agencies are
supporting the finalisation of the evidence. This will inform the draft plan
and support progression to the national gate check, for which formal
approval must be achieved by March 2026.
• Evidence Report - a draft Evidence Report is scheduled to be presented
to the Council meeting in April 2026 for approval, with submission to the
DPEA (Planning and Environmental Appeals Division) for gate check
scheduled for cycle 2 of 2026.
Open Space
Strategy
Complete an Open Space Audit
and develop an Open Space
Strategy, including sports pitch
strategy, to help ensure local
communities have access to
good quality, well maintained
open space to meet their
needs. 
Jan-22 Jun-26 Green  At delivery and
ongoing
management
and monitoring
stage.
2 of the 4 projects / activities within this deliverable are complete:
• Open space audit completed (covering 1,564 sites).  
• An update in respect of the open space audit and drafting the Open
Space Strategy was reported to the Policy and Strategy Committee in
June 2024 (link). 
2 projects / activities are underway:
• Engagement - 12-week programme of partner and community
engagement has been undertaken on the draft Open Space Strategy to
capture feedback on how parks, play areas, sports pitches, and wider
green spaces should be protected, enhanced, and developed.  This is
currently being analysed.
• Final strategy - expected to be reported to committee in cycle 2 of 2026.
Local Transport
Strategy
Develop a Local Transport
Strategy to help prioritise
available investment to ensure
communities can access
employment, education and
leisure opportunities, support
inclusive economic growth and
contribute to reducing carbon
emissions. 
Jun-24 Apr-26 Green At delivery and
ongoing
management
and monitoring
stage.
3 of the 5 projects / activities within this deliverable are complete:
• Key preparatory work - including a policy review, baseline evidence
gathering, Strategic Environmental Assessments, and the first phase of
public and stakeholder engagement - is complete. 
2 projects / activities are underway:
• Consultation - phase 2 of the consultation exercise concluded in
February 2026, with feedback from both phases currently being
analysed and used to inform the final development of the strategy.
• Local Transport Strategy - completed strategy is scheduled to be
presented to committee in cycle 3 of 2026. 
Active travel Create 50 kms of active travel
routes to help establish a
network of safe, accessible
walking / wheeling / cycling
routes to help people access
employment, education, and
Apr-22 Mar-29 Green At delivery and
ongoing
management
and monitoring
stage.
10 of the 26 projects / activities within this deliverable are complete:
• Meadowhead Road in Wishaw - active travel and road safety
improvements.
• Glasgow Road in Craigneuk - phase 1 and phase 2 construction in
respect of active travel improvements.
• Airbles Road - feasibility and concept design in respect of active travel
Page 21 of 454

Page 22

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
leisure opportunities, improve
health and well-being, and
reduce carbon emissions. 
improvements.
• North and South Lanarkshire - design project in respect of cross
boundary active travel improvements.
• Belziehill Roundabout - 0.5 kms.
• Glasgow Road phase three - 1.9 kms.
• Riverbank Community Hub in Coatbridge - active travel.
• Orbiston Community Hub in Bellshill - active travel
• Current and future estate planning - incorporation of active travel as a
key priority when planning investment in the council's current and future
estate, including the hub programme, to strengthen and improve
connectivity and uptake of walking and cycling.
• Bespoke active travel hubs - identified at community hubs and other
service delivery areas. 
The other 16 projects / activities within this deliverable are underway and
are at either the design or construction stage:
• 1 kms on the A723 between South Lanarkshire boundary and Carfin via
Motherwell (design).
• 20 kms at Uddingston to Caldercruix via Coatbridge and Airdrie utilising
both NCN75 and A89 route options (design).
• 5.7 kms on Airbles Road to South Lanarkshire at Strathclyde Park and
to Bothwell (design).
• 3.7 kms at Strathclyde Park sub-route (design).
• 2 kms at Airbles Road sub-route (design).
• 10.8 kms at East-West Corridor between Stepps and Condorrat via the
A80 and Dalshannon (design).
• 13.2 kms at East-West Corridor between A74 Glasgow border and
Newhouse via Bellshill and Holytown (design).
• 4.5 kms at Bellshill to Mossend and Eurocentral including local links
(design).
• 8.9 kms at North-South Corridor from Coatbridge to Muirend via
Drumpellier Country Park (design).
• 35 kms at North-South Corridor from Croy to Wishaw via Cumbernauld
Circular, Airdrie, Calderbank, Eurocentral, Holytown, Carfin,
Ravenscraig, and Shieldmuir via A721 (design).
• 0.5 kms at Eurocentral links (design).
• 6 kms at Kilsyth to Wishaw via Croy, Broadwood, Condorrat,
Coatbridge, Bellshill, and Motherwell (design / construction).
• 3.8 kms at Orbiston Hub and Bellshill Station links (construction).
• 1.5 kms at Croy to Craiglinn (design).
• 5 kms at Motherwell Station links (design).
• 1 kms at Whifflet Station to Shawhead sub-route (design). Page 22 of 454

Page 23

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber) 
An update in respect of each of the active travel projects / activities was
reported to the Enterprise and Fair Work Committee in August 2025 (link) -
as part of the Economic Regeneration Delivery Plan (ERDP) annual update.
This also reported that 19.85 kms of active travel routes have been created
between 2019/20 and 2024/25. 
City Deal Deliver the City Deal programme
to improve connectivity and help
support inclusive economic
growth. 
Apr-23 Apr-31 Green At delivery and
ongoing
management
and monitoring
stage.
The North Lanarkshire City Deal infrastructure programme is progressing
as per the regular updates on status reported to the Enterprise and Fair
Work Committee, with the most recent in August 2025 (link) and February
2026 (link). 
East Airdrie Link Road (EALR) - 1 out of the 9 projects / activities within this
deliverable is complete:
• An update was reported to the Policy and Strategy Committee in June
2025 (link) in respect of the East Airdrie Link Road. 
The other projects / activities are underway in line with the programme:
• Current actions are focussing on completing stage 3 preliminary design,
progressing planning applications, and securing land acquisition.
Preliminary design milestones have been met, the first planning
application for Towers Road link has been submitted, and the District
Valuer has been appointed to support ongoing land acquisition,
alongside discussions on delivery options with NHS Lanarkshire. 
• Next steps include submitting planning applications for the full route,
finalising stage 3 contract milestones, concluding land acquisition,
agreeing the delivery approach, and procuring the specimen design for
both sections. 
Orchardfarm Roundabout - 2 out of the 2 projects / activities within this
deliverable are underway:
• Actions include the submission and approval of the Full Business Case
to the Glasgow City Region Cabinet and oversight of the Orchardfarm
Roundabout works being delivered by a third party. Stakeholder meeting
has taken place to discuss site infrastructure matters, and an updated
subsidy control opinion obtained. Ongoing work includes continued
dialogue with stakeholders and the developers to identify solutions and
agree a programme for the procurement and delivery of the A8 junction. 
Ravenscraig Access Infrastructure (RAI) - projects / activities within this
deliverable are underway in line with the programme:
• Work on RAI South (Motherwell to Ravenscraig) covers the detailed
design and phased enabling works. Member briefings, public
consultation, and procurement of both the detailed design and enabling
works are complete, with enabling works now underway.  Page 23 of 454

Page 24

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
• Remaining actions include concluding the detailed design, preparing
contract documentation and procurement for the main works, continuing
enabling works, and producing as-built information for inclusion in the
main works tender. 
An update reported to the Enterprise and Fair Work Committee in August
2025 (link) highlighted community benefits delivery related to the City Deal
programme over 2024/25.
Business and
industry
Develop a Business and
Industry Strategy including
review of available sites, and
progress a minimum of 5
projects to remediate, develop,
or improve sites to help create
new employment opportunities.
Mar-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
2 of the 7 projects / activities within this deliverable are complete:
• Link Park, Newhouse - construction is complete with unit 3 (19,000
square feet) developed - this has now been let with the tenant taking up
residence early in 2026.
• Strategic review - work to review industrial space and sites allocated for
business and industry within the Local Development Plan is complete. 
5 projects / activities are underway:
• Business and Industry Strategy - research for development of a 10 year
strategy is complete.  Background report and next steps submitted to
Enterprise and Fair Work Committee in February 2026 (link).
• Braidhurst Industrial Estate - progress continues on constructing 10 new
industrial units, refurbishing 6 existing units, and delivering associated
infrastructure improvements. Utility requirements have been confirmed,
and a programme has been agreed between SPEN and the contractor
to allow on-site utility works to proceed. 
• Condor Park, Eurocentral - plans have been prepared for the
development of up to 8 small industrial units through a joint venture.
Next steps include undertaking site investigations and developing a
timeline and delivery plan to progress the project.
• Gartcosh (phase 2) - design review is complete and revisions are
underway, with discussions continuing regarding a potential
joint-venture partner to deliver three industrial units of 15,000, 20,000
and 30,000 square feet.
• Ravenscraig plot 1 - Final Business Case approved by Glasgow City
Region in respect of the development of 4 units totalling up to 61,000
square feet. Subsidy control assessment has been completed, grant
agreement is finalised, and work is progressing toward letting the
contract and commencing on-site construction.
Town centres Develop Town Action Plans for
each town centre in line with the
agreed Town Visions
(completing 3 town action plans
in 2023/24 and 4 in 2024/25)
Oct-23 Oct-25 Green At delivery and
ongoing
management
and monitoring
stage.
2 of the 3 projects / activities within this deliverable are complete:
• An update on town centres projects / activities was reported to the
Enterprise and Fair Work Committee in August 2025 (link) as part of the
annual Economic Regeneration Delivery Plan (ERDP) update. This also
reported that since the ERDP was introduced in 2019, town visions have Page 24 of 454

Page 25

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
and progress delivery to help
create sustainable mixed-use
centres that will attract
investment in new employment
and housing opportunities.
been developed for Airdrie, Bellshill, Coatbridge, Cumbernauld, Kilsyth,
Motherwell, Shotts, and Wishaw. 
• In addition, Town Action Plans have been developed for Airdrie, Bellshill,
Kilsyth, Motherwell, Shotts, and Wishaw, setting out the short, medium,
and long‐term actions to deliver each vision. These were approved at
the Enterprise and Fair Work Committee in May 2024 (link).
• An annual review of Town Action Plans has been completed and an
update reported to the Enterprise and Fair Work Committee in
November 2025 (link). 
Following £19.5m awarded by the UK Government over ten years for
Coatbridge, a Neighbourhood Board has been established and draft
investment plan approved for consultation. Regeneration plan and initial
4-year investment plan submitted to the UK Government in November 2025
for formal approval.
• An update in respect of Coatbridge was submitted to the Enterprise and
Fair Work Committee in November 2025 (link). 
UK Government Pride in Place funding was announced for Forgewood,
North Motherwell and town centre in December 2025 - £19.6m over 10
years.  Work is progressing to establish a Neighbourhood Board and
commence preparation of Pride in Place plan and investment plan.  Update
reported to the Enterprise and Fair Work Committee in February 2026 (link).
Town centres Develop Delivery Plan for
Cumbernauld Town Centre
regeneration and progress
redevelopment plans and
demolition of the Centre
Cumbernauld. 
Jun-23 Mar-34 Green At initiation
stage.
1 of the 4 projects / activities within this deliverable is complete:
• Procurement of new longer-term management contracts is complete. 
1 project / activity is underway, with the other 2 not yet due to start.
• The first stage of consultation and engagement with businesses and the
public has been completed. Demolition of Fleming House is complete
and plans for the demolition of the shopping centre are on track
(estimated to start in 2027).  Procurement of managing agent is
complete. Development of brief for procurement of consultants to
prepare masterplan has commenced. 
Stage 1 demolition (Teviot Walk / Teviot Square) is scheduled to commence
in 2027/28. 
Stage 2 demolition of The Centre Cumbernauld (the older part of the town
centre on both the north and south side of Central Way) is scheduled to
commence 2031/32.
Towers strategy Complete phase 1 Tower re-
provisioning programme of
1,750 flats by 2025/26, and
Mar-23 Nov-30 Green At delivery and
ongoing
management
All Phase 1 towers currently in scope for the reprovisioning programme
(1,550 flats) are now fully vacated, with demolitions and site clear-up works
progressing well to make way for new detached and semi-detached homes
Page 25 of 454

Page 26

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
progress phase 2 comprising
964 flats.
and monitoring
stage.
that will offer modern, affordable housing for current and future generations.
Progress on phase 2 is also strong, with 47% of the 964 properties now
empty, and the first demolition on schedule to begin in spring 2027. 
• Phase one rehousing existing tenants is 100% complete, with the
exception of Birkshaw and High Coats which are delayed due to
Ukrainian resettlement programme.
• Demolition of remaining block at Gowkthrapple Low Rise commenced in
March 2026 and is due for completion June 2026.
• The principle contractor took possession of Allershaw Tower for
demolition in December 2025 with works progressing well and
scheduled for completion in Q3 2026.
• The demolition contract continues on site at Jackson Court with works
progressing well and on track for completion in Q1 2026.
• The principle contractor took possession of Dunbeth Court in December
2025 for its demolition. Works progressing well on site and scheduled
for completion by Q2 2027.
• The blowdown of Coursington, Allen, and Draffen Towers took place in
December 2025, and site clear up is underway with expected
completion in Q1 2026/27.
• 4 Blocks at Maxton Crescent have been added to the phase 1
demolition programme following the discovery of RAAC and approval
received at the Housing Committee in February 2025 to dispose of
these blocks.  Contract award arrangements are being finalised and
works expected to commence in Q1 2026. 
Regular updates in respect of towers strategy delivery continue to be
reported to the Housing Committee with the most recent in November 2025
(link). 
Q1 = Apr-Jun, Q2 = Jul-Sept, Q3 =Oct-Dec, Q4 = Jan-Mar.
Re-discover
Airdrie 
Invest in cultural and heritage
assets, including Summerlee
and Rediscovering Airdrie
heritage initiative, to increase
community pride and awareness
of local heritage and make North
Lanarkshire an attractive visitor
destination.
Jan-24 Jan-25 Blue Completed or
at closure
stage.
All 3 projects / activities within this deliverable are complete:
• Engagement with local community and groups now complete (with links
made to wider opportunities in Airdrie area) as well as engagement with
residents, the Community Board, and local groups.
• Consultant appointed, site visits underway, and plans for development
are being prepared to identify the physical interventions required to
restore and repurpose heritage assets and improve the townscape.
• The conclusion of this first phase of Rediscovering Airdrie - with a
significant programme of public engagement - enabled the development
plan and application for final funding to be submitted to support
implementation of the next steps. 
Page 26 of 454

Page 27

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
In February 2026, a £1.4m award was confirmed from the National Lottery
Heritage Fund for the Airdrie heritage project.  A key element of this is the
restoration and redevelopment of the historic Airdrie Library, home to
Scotland’s first library under the Public Libraries Act. A shopfront
improvement scheme will also boost the town centre.
Celebrate
Summerlee
Invest in cultural and heritage
assets, including Summerlee
and Rediscovering Airdrie
heritage initiative, to increase
community pride and awareness
of local heritage and make North
Lanarkshire an attractive visitor
destination.
Jan-24 May-26 Green At delivery and
ongoing
management
and monitoring
stage.
All 4 projects / activities within this deliverable are underway - these have to
date focussed on extensive stakeholder engagement, building evidence to
support the funding application, and developing plans for capital
interventions including for the extension of the current miners’ row to
establish a new miners’ village and welfare hall, and to develop proposals
for a new Summerlee.
Increase
community pride
through cultural
heritage
development
Invest in cultural and heritage
assets, including Summerlee
and Rediscovering Airdrie
heritage initiative, to increase
community pride and awareness
of local heritage and make North
Lanarkshire an attractive visitor
destination.
Jan-24 Dec-27 Green At delivery and
ongoing
management
and monitoring
stage.
Heritage Outreach Officer now in post and has attended all Community
Boards to raise awareness of the role.  Engagement continues with local
groups to discuss projects of interest and support delivery in this respect
thereafter.
Invest in North Lanarkshire [ overall completed status = 100% ]
Establish a small multi-disciplinary team,
comprising planning, roads, estates, enterprise,
protective services, building standards, and legal,
to deliver a Pilot project to provide an enhanced
and co-ordinated advisory service to developers
and prospective investors to help improve /
streamline the statutory consent process and
maximise potential economic benefits. 
Sep-23 Dec-23 Blue Completed or
at closure
stage.
Complete. Pilot project completed and evaluation undertaken, and feedback
used to inform the next steps.
Based on learning from the Pilot and wider market
engagement, review and develop proposals for an
effective future operating model to make best use
of available resources, including charging for the
enhanced Pre App service, and streamlining the
process for obtaining statutory consents. 
Feb-24 Dec-24 Blue Completed or
at closure
stage.
Complete. Stakeholder engagement and review of good practice from
elsewhere completed. Development completed in respect of the future
operating model, including proposed fees and performance measures, and
to progress any necessary approvals for changes to staffing.  Manager now
in post and team established. 
Develop a Gate Check process for all major
council investment projects, where statutory
consents required, to ensure projects get the
Feb-24 Sep-24 Blue Completed or
at closure
stage.
Complete. Gate check process completed following consultation with
relevant internal stakeholders and incorporated within project management
guidance and relevant project approval processes.
Page 27 of 454

Page 28

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
necessary input from relevant services at an early
stage and avoid potential increased costs and/or
delays at a later stage. 
Support delivery of allocated sites within the Local
Development Plan through development of
effective delivery plans. 
Blue Completed or
at closure
stage.
Complete. This activity has been incorporated within the future operating
model considerations for the Invest in North Lanarkshire team.  
Co-ordinate development of masterplans /
development briefs and appraisal process for
major council owned development sites.    
Blue Completed or
at closure
stage.
Complete. As an ongoing business as usual area of work, the development
for masterplans, development briefs, and the appraisal process for major
council owned sites will be undertaken as and when sites become available
through the Invest in North Lanarkshire process.
Review and develop process for the co-ordination
of inward investment / business growth enquiries,
including development of Customer Relationship
Management (CRM) system. 
Mar-23 Mar-24 Blue Completed or
at closure
stage.
Complete. The CRM system - to record and better co-ordinate business
engagement and growth enquiries and measure outcomes - went live June
2024 and enquiries are being directed to the new system which links to Bis
Account.  Staff training and user manuals are complete, and enquiries are
coming in from businesses.  Final steps have seen the system embedded
as business usual with reports being produced.
Sustainable Futures  [ overall completed status = 24% ]
Energy efficiency 
and generation
Develop a route map to net zero
that incorporates climate
resilience (adaptation) and
provides strategic actions as to
how the council will move to net
zero (including outline costs
where possible, timeframe,
review periods).
Jan-24 Jun-26 Green At delivery and
ongoing
management
and monitoring
stage.
Work on the council’s Net Zero Pathway (climate plan) is progressing. This
will set out how the council could achieve net zero greenhouse gas
emissions through a review of baseline data, confirmation of organisational
and area boundaries, and the identification of target ambitions using carbon
budgeting. It will also outline the actions required to prevent further
environmental harm while strengthening climate resilience and
sustainability. Developing a fully costed pathway remains challenging due to
the complexity of the work and the wider financial environment. The final
plan is scheduled to be reported to committee in cycle 2 of 2026. 
Energy efficiency 
and generation
Undertake research with a
potential energy partner to
explore renewable energy and
hydrogen generation projects as
commercial opportunities in
North Lanarkshire. This will
include examining the business
case for the delivery of larger
scale energy generation /
hydrogen production and the
delivery of smaller energy
projects, including the
introduction of solar farms on
Nov-22 Dec-26 Green At delivery and
ongoing
management
and monitoring
stage.
2 projects / activities within this deliverable are underway.
• Solar meadows at Auchinlea and Dalmacoulter closed landfill sites -
work with the energy providers is underway to agree the next steps,
planning application has been submitted and consultation is underway.
• Energy feasibility study - work is underway to enable a feasibility study
on the chosen solar sites.
Page 28 of 454

Page 29

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
closed landfill sites and energy
storage options adjacent to
electrical sub-stations.
Energy efficiency 
and generation
Improve asset sustainability
through the development of the
Live Labs 2 project to deliver
more sustainable road surfacing,
deliver a social enterprise pilot
for environmental services, and
increase recycling facilities
across the area.
Apr-22 Mar-27 Green At delivery and
ongoing
management
and monitoring
stage.
1 of the 4 projects / activities within this deliverable is complete:
• Work to upgrade communal recycling points - improving customer
service, reducing contamination, and increasing recycling - has been
completed, with bins installed at all identified sites and waste quality
now being monitored. 
3 projects / activities are underway:
• Alternative solutions to upgrade the council’s recycling centres to accept
tipper vehicles and meet persistent organic pollutant requirements have
been scaled back due to funding constraints. A new option has been
identified, and phased black-bag trials are underway at three household
waste recycling centres, with the outcome from this approach due to
inform the next steps.
• Several low-carbon road material trials have been completed in North
Lanarkshire as part of the ADEPT Live Labs 2 programme, delivered in
partnership with Transport for West Midlands, Amey and Colas. An
extension funding bid has been submitted, and final trials - including
resurfacing the Strathclyde Country Park Watersports Centre car park -
are being arranged. 
• Work has commenced to develop alternative delivery options for front-
line services in conjunction with community organisations and
community empowerment requirements to help communities do things
for themselves. 
The most recent update was reported to the Environment and Climate
Change Committee in February 2026 (link).
Energy efficiency 
and generation
Explore green energy funding
options which will assist in the
move towards net zero, for both
council assets and businesses
within North Lanarkshire.
Feb-24 Mar-25 Blue Completed or
at closure
stage.
The project was completed in March 2025. The £250,000 Net Zero
Business Challenge Fund supported small-medium enterprises with grants
of up to £15,000, running two oversubscribed rounds and funding 17
projects (£190,637 awarded) ranging from solar installations to innovative
product and process improvements. Future support is now integrated into
the Business Growth Fund.
Energy efficiency 
and generation
Deliver low carbon North
Lanarkshire assets through the
delivery of Local Heat and
Energy Efficient Strategy
(LHEES), Energy Efficiency
Standard for Social Housing
Apr-21 Dec-45 Amber At delivery and
ongoing
management
and monitoring
stage.
3 of the 14 projects / activities within this deliverable are complete:
• The council published the Local Heat and Energy Efficiency Strategy
(LHEES) following committee oversight in December 2023 (link),
appointed an LHEES/Network Officer, and has begun engagement with
businesses and heat-source providers while awaiting the outcome of a
funding bid for a Coatbridge feasibility study.
Page 29 of 454

Page 30

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
(EESSH), decarbonisation of the
council transport fleet,
introduction of electrical vehicle
charging infrastructure across
North Lanarkshire, and
introduction of a waste transfer
station and material recovery
facility.
• Market research on potential sites for new waste streams and a
Materials Recovery Facility (MRF) has been completed, with one
suitable site identified.
• The Energy Audit Voucher Scheme (up to £2,500 per grant) supported
11 small-medium enterprises, awarding £26,072 in total; businesses
reported benefits from the expert energy-efficiency audits, many of
which have already been implemented. 
11 projects / activities are underway:
• Heat network - grant funding application is being developed to support a
feasibility study for a heat network in the identified priority area.
• Strathclyde Park - work is progressing on the net-zero transformation of
the Watersports Centre into a low-carbon health and education hub. The
scope for the water source heat pump contractors design portion has
been issued, and options are being explored to procure independent
specialist technical advice to support the next phase.
• Energy efficiency improvements - delivery of energy-efficiency
improvements across the council’s non-domestic buildings is ongoing
through the Non-Domestic Energy Efficiency Framework, with the
project scheduled for completion at the end of 2026 following the
measurement and verification period.
• Vehicle replacement programme - the council’s programme supports
progress toward low and zero-emission targets. Vehicle purchases are
pre-planned and approved within the five-year vehicle strategy, though
delivery timescales vary by vehicle type, which can result in capital
spend moving between financial years.
• Eco Hub, Bellshill - options for a potential public-private partnership to
deliver the Eco Hub - including fleet and public electric vehicle (EV)
charging for the council’s fleet - are under consideration, with evaluation
of delivery approaches continuing.
• EV charging infrastructure - procurement documentation has been
finalised with Glasgow City Region.  Existing assets plus phase 1 and 2
locations have been agreed. Invitation to tender will be issued in line
with the Glasgow City Region timeline.
• Charging infrastructure at depots, offices, and hubs - all required
documentation is in place except for the wayleave, which must be
finalised and signed by both parties. Once complete, works will begin
and the pilot is scheduled to go live early in 2026. A new project will then
be developed to monitor the pilot’s impact and support the rollout of
similar charging hubs across North Lanarkshire.
• Energy Performance Certificate (EPC) rating of D by December 2025 -
work continues to ensure all council-owned homes meet this target. The Page 30 of 454

Page 31

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
main risk relates to 99 properties where access was not possible; these
will be assessed and upgraded at the next void period, as properties
below Band D cannot be re-let. All homes rated E, F, or G have been
visited, with 22% confirmed below Band D, 44% meeting Band D or
above, and 34% no access. All properties confirmed below Band D have
been added to the capital programme for improvement works.
• Energy Performance Certificate (EPC) rating of B (or to be as by energy
efficient as possible) by December 2032 - works are progressing
prioritised by compliance with energy standards, condition, and extent of
fuel poverty.  Funding applications have been submitted to the Heat in
Buildings: Area Based Scheme and the Social Housing Net Zero Heat
Fund to support delivery.
• Net zero council housing by 2045 - work is progressing to upgrade
council homes, including the future decarbonisation of heating.
Improvements aimed at achieving EPC Band B - or the highest
achievable energy efficiency - are underway, which will make a
significant contribution toward net zero. Key challenges remain, such as
the high cost of low-carbon technologies, limited specialist contractor
capacity, and ensuring tenants do not face higher heating costs when
gas boilers are replaced with cleaner energy alternatives.  While
achieving full net zero by 2045 is unlikely, the council continues to
explore new technologies and solutions to accelerate progress.
• Expert help scheme - this continues to support small-medium
enterprises with up to five days of fully funded specialist advice on
energy efficiency and net zero. To date, £9,491 has been spent or
committed across six projects, with £3,000 remaining in the four-year
framework. Options to extend provision are being explored to meet
growing demand.
Climate
adaptation
Develop nature-based
adaptations which will centre
around the Country Parks for the
Future programme and the
Clyde Climate Forest. 
Mar-20 Jul-35 Amber At delivery and
ongoing
management
and monitoring
stage. 
All 3 of the projects / activities within this deliverable are underway:
• Masterplans delivery - work is underway to encourage more active
community use of parks and greenspaces, but progress is impacted by
funding for further Masterplan projects beyond the Watersports Centre.
This pressure affects staff capacity and reduces the likelihood of
securing large external grants by 2030. To mitigate this, external funding
bids - including a major National Lottery Heritage Fund bid for
Palacerigg - are being progressed. A mid-point review is being
undertaken to inform future capital and funding bids.
• Nature recovery programme - the annual programme to deliver habitat
restoration, freshwater improvements, and invasive species control is
progressing well. The Sites of Importance for Nature Conservation
(SINC) surveys contract is underway, and bog restoration works Page 31 of 454

Page 32

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
contract has been awarded. Next steps include completing the SINC
surveys and finalising bog restoration works at Greenhead Moss Local
Nature Reserve.
• Clyde Climate Forest - the council continues to support this tree-planting
programme which aims to increase woodland cover across the region.
Winter replanting works are underway, and the specification for
woodland audits has been prepared. Next steps include carrying out the
audits and identifying additional planting sites. 
Update reported to the Environment and Climate Change Committee in
February 2026 (link).
Climate
adaptation
Improve North Lanarkshire's
assets to be climate resilient
with a focus on flood prevention
measures. 
Jan-22 Mar-34 Amber At delivery and
ongoing
management
and monitoring
stage.
All 4 of the projects / activities within this deliverable are underway:
• Tree risk asset management - work continues to implement the council’s
Tree Risk Asset Management (TRAM) strategy, including mapping and
assessing tree condition and analysing ash-dieback survey data for
roadside trees. An update was provided to the Environment and Climate
Change Committee in October 2024 (link).
• Burial Space Strategy - work is progressing to ensure sufficient and
accessible burial provision across all communities, supporting statutory
requirements and helping reduce funeral poverty. Although current
capital funding is below what is needed for all planned projects, capacity
is being actively managed across sites, including through the new
Pather Farm Cemetery.  A report to the Environment and Climate
Change Committee in August 2025 (link) provided an update on burial
space needs,  ongoing improvements, and planned actions to ensure
adequate provision. Work is progressing on a lair-usage forecasting
model to support the 2026/27 Burial Space Strategy.
• Cemetery delivery - work continues on the new Pather Farm cemetery,
phase 2 of the the Coltswood extension, and planning for additional
capacity in Coatbridge and New Monkland. At Pather Farm, costs have
risen due to design issues and delays, pushing completion to May 2026;
however, added staff expertise is now in place. Despite delays, earlier
capacity increases at other sites mean completion remains within
projected timelines. The main risks relate to consultant design issues
and internal inconsistencies, with lessons learned to strengthen future
projects and ensure better oversight.
- Coltswood - phase 1 was completed in May 2025, creating 287 new
lairs and extending Coatbridge’s burial-space run-out date by two
years. 
- Cambusnethan - a small extension completed in summer 2025
created 222 standard lairs and 150 Muslim lairs, extending capacity
by over two years and ten years respectively. Page 32 of 454

Page 33

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
• Flood Risk Management - work continues to deliver flood-risk
management in line with the Clyde and Loch Lomond Local Flood Risk
Management Plan. Progress has been delayed due to required Scottish
Water approvals for ground investigations near a water main, which
pushed back the contractor’s programme. Additional topographical
surveys and hydraulic modelling were also needed to assess
downstream impacts, including at Townhead Reservoir. As a result,
detailed design completion has moved with overall delivery
reprogrammed to June 2026. To mitigate delays, the council is working
with partners to prepare an enabling-works package that can begin
ahead of the main construction contract.
Climate
adaptation
Reduce climate impact
inequalities including delivery of
the actions within the council's
Air Quality Action Plan.
Jan-24 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
Progress continues across the council’s air-quality commitments, including
active travel, school-zone monitoring and integrating air-quality
considerations into procurement. The 2024 Air Quality annual progress
report was submitted in September 2025, approved by SEPA and the
Scottish Government, and is now published on the council’s website.
Vehicle-idling patrols are in peration around schools and hotspot areas, with
42 patrols completed in July to August 2025 and a further 70 scheduled to
be completed by December 2025.
Climate
adaptation
Engage all stakeholders in
climate adaptation decision
making and delivery, with a
focus on young people. This will
be driven through the council's
Climate Action Plan which will
be reviewed to reflect the works
being undertaken across this
Programme of Work and others.
Feb-20 Mar-26 Green At delivery and
ongoing
management
and monitoring
stage.
2 of the 3 projects / activities within this deliverable are complete:
• School engagement - engagement with schools on climate-change
campaigns, including Earth Hour, continues annually with the latest
creative competition theme aligned to the sustainable future priority.
• Fairtrade - the council successfully retained Fairtrade Zone status until
May 2027. The Fairtrade steering group continues to monitor progress
and plan activities, including raising awareness during Fairtrade
Fortnight - highlighted by flying the Fairtrade flag at the Civic Centre. 
The remaining project / activity is underway:
• Financial support was provided through three grant schemes that closed
in March 2025, awarding 198 grants and £1.3 million to help businesses
operate more sustainably. Two new schemes - the Business Start-up
Fund and Business Growth Fund - launched in April 2025, with a third
fund approved in August 2025 (link) to help bring empty retail units back
into use, including energy-efficiency improvements. As of December
2025, £56,200 in net-zero Business Growth Fund grants has been paid
or committed to four businesses.
Climate
adaptation
Deliver the North Lanarkshire
Nearer to Nature programme in
order to ensure local
communities most susceptible to
Jan-26 Dec-27 Green At initiation
stage.
This programme is new to the Programme of Work and delivery will include
initial desktop mapping and analysis, followed by a community consultation
programme, environmental justice mapping and work to identify existing
groups and harder-to-reach communities in line with Local Outcome Page 33 of 454

Page 34

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
climate change have a voice in
shaping investment in
greenspaces.
Improvement Plan (LOIP) engagement. A digital platform will support
ongoing participation, and a specialist appointed to design a sustainable
funding model. This work will inform a co-designed 10-year Greenspace
Infrastructure Plan, with a draft prepared for consideration in advance.
Resilient People [ overall completed status = 47% ]
Accessible and
inclusive family
support
Develop and deliver integrated
offer of early practical,
emotional, and financial support
aligned to the community hubs
to ensure the right support at the
right time to individuals and
families.
Aug-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
1 out of the 5 projects / activities within this deliverable is now completed:
• The service has been commissioned and fully mobilised through Whole
Family Wellbeing funding, expanding the Families Here and Now
Service (FHANS) early-help offer from the initial Newmains pilot across
Wishaw and now to all areas across North Lanarkshire. 
4 other activities underway include:
• Work with families, staff and providers continues to embed the new
early-help service within the hub model, supported by stronger
communication, increasing activity-based engagement, a new SWAY
information resource, improved pathways, and expanded access
through the new Orbiston Hub, alongside better alignment of GIRFEC
and GIRFE approaches.
• The review of the wider family-support offer and delivery is progressing,
with a communication plan in place, HR and union engagement
completed, a scoping survey issued, and early staff input gathered;
findings will shape the review methodology and next-stage engagement.
• Work to strengthen the cash-first approach continues, with
direct-payment initiatives expanded into the community learning and
development family learning service, improved access via Fairer
Futures partners, and learning on family needs shaping support
pathways; further evaluation and adjustments to tackling-poverty access
routes are underway.
• Efforts to create economic opportunities for families are progressing
through strengthened Routes to Work pathways, early-help support for
those furthest from employment, volunteer recruitment, and alignment
with community learning and development family learning to enable
accreditation when appropriate.
Accessible and
inclusive family
support
Establish a no wrong door
approach to deliver early family
support using continuous
evaluation and co-production to
develop a sustainable and
effective model for the future
built on the principles of the
Promise, GIRFEC (Getting it
Jan-24 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
4 out of the 8 projects / activities within this deliverable are now completed:
• Pathways have been developed with all partners to ensure a
no-wrong-door, whole-family approach aligned to GIRFEC and GIRFE,
supported by an operational group testing referral and escalation
pathways.
• An all-age carer working group has been established to address current
issues and challenges facing carers.
• Gaps in current carer support have been identified using feedback from Page 34 of 454

Page 35

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
Right for Every Child), and
GIRFE (Getting it Right for
Everyone).
children, young people, and families, with data informing opportunities
to strengthen connections across education, health, and social work.
• The North Lanarkshire Carer Strategy 2024-27 has been updated and
approved, following consultation to ensure clear representation of
parent and carer needs. 
4 projects / activities are underway:
• Engagement with families, communities, staff, and providers continues
to embed whole-family support within community hubs, with stronger
partnership working and hub delivery boards improving understanding
of local need and coordinating flexible support.
• Work with the One Service programme continues to pilot integrated
functions in community and town hubs, with collaboration across
services and partners shaping updated 2026 hub action plans and
consideration of front-of-house requirements to strengthen contact and
signposting for families.
• A communication plan is being developed to ensure whole-family
support is well understood, supported by ongoing promotion, recent
networking to improve pathways, and consultation on a mock GIRFEC
in NL site ahead of further engagement next quarter.
• A point of contact is being introduced in up to 14 hubs as part of the
no-wrong-door approach, with integrated hub action plans, new services
in Orbiston, strong family engagement at recent events, and continued
work to measure impact and build capacity as hubs expand in 2026.
Accessible and
inclusive family
support
Implement GIRFE (Getting it
Right for Everyone) approach in
adult services to improve
pathways to support.
Jan-24 Jun-26 Green At delivery and
ongoing
management
and monitoring
stage.
2 out of the 4 projects / activities within this deliverable are complete:
• A place based back to basics locality approach has been implemented
to ensure a clear pathway for people that supports empowerment and
aligns with whole family support. 
• The Engagement and Participation Strategy has been refreshed to
support strong voices and promote independence and connections. 
2 projects / activities are underway:
• Implementation of the sticky-person approach is complete, with launch
and locality-level plans in place to ensure a single lead person co-
ordinates support and reduces multiple referrals. This approach is
operating across services, supported by ongoing work to strengthen
integration across health and social care and embed GIRFE-aligned,
person-centred practice within a learning-focused organisational culture.
• Further work demonstrates the wide range of activity underway to
improve outcomes for children, young people, and families through a
long-term shift toward preventative, right-time support. This includes
integrated investment through the Whole Family Wellbeing Fund,
Page 35 of 454

Page 36

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
Scottish Equity Fund, and Community Mental Health and Wellbeing
Framework grants, with supports aligned to universal, additional, and
intensive levels in line with the staged-intervention model. 
Accessible and
inclusive family
support
Introduce the Signs of Safety in
children's services as a
transformative approach to
strengthening families and
addressing risks of harm.
Dec-23 Nov-28 Green At delivery and
ongoing
management
and monitoring
stage.
1 of the 3 projects / activities within this deliverable is complete:
• Signs of Safety group is now in place to lead implementation and
oversee training for council staff and partners, supporting a more
asset-based and empowering approach with families. Eighteen months
into the two-year plan, core training has been delivered, the assessment
and planning framework is being used within children and families’
services, and partnership briefings continue to build awareness of the
model and clarify roles and expectations. 
The remaining 2 projects / activities within this deliverable are underway:
• Work continues to embed the Signs of Safety and Healing approach
across social work practice, with the two-year implementation plan now
complete and all social workers trained through workshops and
development sessions. A baseline evaluation has been carried out to
track future impact, and an oversight group with a linked plan is in place
to drive ongoing training, development and evaluation.
• Procedures and operating models across the council and partner
services are being reviewed and updated to fully embed Signs of Safety,
supported by the completed implementation plan. The assessment and
planning framework is live on MOSAIC with staff guidance, updated
procedures for care-experienced children and young people, and policy
and procedure reviews to ensure the approach is consistently applied.
Accessible and
inclusive family
support
Embed the Close to Home
initiative in both adult and
children's services to ensure
that people benefit from effective
support, connections, and
opportunities with their own
communities.
Apr-20 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
1 of the 3 projects / activities within this deliverable is complete:
• Investment in family group decision making and lifelong links has helped
more children remain safely at home, supported by a training video and
annual report data showing 63 of 125 families in 2024/25 developed
plans that avoided the need for care. Outcomes have been shared with
social work teams, and approaches are now part of everyday practice,
though still supported by temporary grant funding. 
The remaining 2 projects / activities within this deliverable are underway:
• Whole Family Wellbeing Funding is strengthening additional and
intensive supports that help children in kinship care and those with
additional support needs remain safely at home. Evidence shows timely
support preventing escalation, with an options report being developed.
New family support workers are in post, commissioned support for birth
and care-experienced parents is underway, and Lifelong Links,
Aftercare, and Family Group Decision Making continue to deliver
positive outcomes backed by impact and cost-benefit analysis. Page 36 of 454

Page 37

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
• Integrated planning for children and adults with complex needs is being
strengthened to reduce out-of-area placements, with ongoing
cross-service work to improve joint planning. An education
representative has joined the Carers Oversight Group, and evaluation
activity is underway to assess the impact of enhanced carer-support.
Tackling poverty
and preventing
homelessness
Implement a comprehensive
new Tackling Poverty Strategy
(2023-26) as the vehicle to
continue to reduce child poverty,
address inequalities, and
support active citizenship and
growth.
Apr-23 Mar-26 Green At delivery and
ongoing
management
and monitoring
stage.
The Local Child Poverty Action Report and updated Tackling Poverty Action
Plan were approved by the Wellbeing and Tackling Poverty Committee in
November 2024 (link), outlining progress on employment support, holistic
services, cost-of-living measures, and benefit-related income.
The Local Child Poverty Action Report for 2024/25 was subsequently
approved by the Wellbeing and Tackling Poverty Committee in October
2025.
Tackling poverty
and preventing
homelessness
Evaluate the impact of the 2023-
26 Strategy and Action Plan and
develop a revised Tackling
Poverty Strategy for 2026-31.
Apr-23 Mar-26 Green At delivery and
ongoing
management
and monitoring
stage.
Progress continues on delivering and reviewing the Tackling Poverty drivers
- income from employment, holistic support, reducing the cost of living, and
income from benefits - with the Tackling Poverty Officers Action Group
regularly assessing impact and reporting to the Wellbeing and Tackling
Poverty Committee. Ongoing needs assessment and engagement,
including the expanded three-questions approach in schools, is informing
development of the revised Tackling Poverty Strategy for 2026-31.
Tackling poverty
and preventing
homelessness
Embed anti-poverty approaches
within all service delivery with a
particular focus on universal
services, strengthening
pathways to support from health
and education and using
Multiply and MACA (money
advice and consumer advice) to
empower young people and
individuals.
Apr-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
All 3 of the projects / activities within this deliverable are underway:
• A rolling programme of poverty-awareness sessions continues across
all services, with further sessions planned for internal and external staff
and work progressing on an online module to broaden access.
• Anti-poverty approaches now embedded across services, with
established pathways for universal support, advice, income
maximisation and money guidance, alongside ongoing work to
strengthen referral routes with partners.
• Financial education for adults and young people is being delivered, with
the Multiply Project supporting working-age adults and a more
integrated approach for children and young people being developed
with Education, who continue to deliver programmes in partnership with
the national initiative.
Tackling poverty
and preventing
homelessness
Review and redesign housing
support services for people
experiencing (or at risk of)
homelessness to ensure
housing support services align
with the new Prevention duties
and provide flexible, strength-
based support to help people
Nov-23 Feb-25 Blue Completed or
at closure
stage.
• Complete. The housing support service review is complete. Report
approved at Housing Committee in November 2024 (link) for the re-
tender of the housing support contracts.   
Page 37 of 454

Page 38

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
successfully sustain their
accommodation and achieve
positive wider life outcomes.
Tackling poverty
and preventing
homelessness
Implement a new crisis
response and assertive outreach
service in partnership with North
Lanarkshire's Alcohol and Drug
Partnership to provide
immediate assistance to people
experiencing homelessness or
at risk of homelessness in need
of an urgent response (outwith
current service provision) to
prevent and reduce recurring
homelessness and improve
access to support and services.
Feb-23 Jun-26 Blue Completed or
at closure
stage.
• Complete. Crisis response and assertive outreach service fully
operational (following developments in partnership with North
Lanarkshire's Alcohol and Drug Partnership and appointed service
provider) to provide support and assistance to people experiencing, or
at risk of, homelessness.  Referrals and outcomes achieved will be
monitored over the duration of the contract.
Tackling poverty
and preventing
homelessness
Review the Temporary
Accommodation Strategy to
identify current and future
temporary accommodation
requirements, giving key
consideration to the
implementation of the Rapid
Rehousing Transition Plan.
Nov-23 May-24 Blue Completed or
at closure
stage.
• Complete. Revised Temporary Accommodation Strategy developed for
2024-29 and approved by the Housing Committee (link).  This identifies
current and future temporary accommodation requirements and
provides recommendations for the future strategy, setting out a range of
actions over the next five-year period.   
Tackling poverty
and preventing
homelessness
To explore innovative ways to
extend the reach of the Scottish
Welfare Fund to assist people
who are homeless or at risk of
homelessness, recognising the
importance of furniture
provisions in aiding positive
tenancy sustainment outcomes.
Feb-23 Apr-24 Blue Completed or
at closure
stage.
All 3 of the projects / activities within this deliverable are complete:
• A fast-track system is now in place for community care grants for
homeless households in temporary accommodation, speeding up
moves to permanent housing and freeing up temporary units.
• Rapid Rehousing Plan funds are confirmed, and a short-life group has
reviewed processes to improve access to furniture to support tenancy
sustainment.
• Options to supplement the Scottish Welfare Fund through the furniture
fund explored.
Tackling poverty
and preventing
homelessness
Significantly reduce
homelessness through
increasing the supply of
affordable homes.
May-25 Aug-27 Green At delivery and
ongoing
management
and monitoring
stage.
1 of the 2 projects / activities within this deliverable is complete:
• New Empty Homes Strategic Framework has been developed and was
approved by the Housing Committee in November 2025. 
The other activity is underway:
• Empty Homes Officer capacity has been increased with the recruitment
of an additional officer, partly funded by the Scottish Empty Homes
Partnership and Scottish Government, who started in December 2025. Page 38 of 454

Page 39

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
An inception meeting with the Scottish Government is scheduled for
early 2026 to set targets and agree actions to bring more empty homes
back into use in North Lanarkshire.
Tackling poverty
and preventing
homelessness
Reduce time spent in temporary
accommodation through access
to settled housing quickly.
Jan-25 May-29 Green At delivery and
ongoing
management
and monitoring
stage.
All 5 of the projects / activities within this deliverable are underway:
• Work continues with Registered Social Landlords to increase lets to
homeless households, with ongoing engagement through a dedicated
working group exploring ways to boost allocations; RSLs continue to be
encouraged to raise their percentage of lets, and monitoring is in place
to identify and address lower-than-required allocation levels.
• Percentage of council homes allocated to homeless households
monitored with locality-level tracking enabling responsive adjustments to
meet changing need; year-to-date lets sit at 52%, above last year’s level
- monitoring continues to ensure allocations remain aligned to demand.
• Work to reduce homelessness from the Private Rented Sector is
ongoing, with engagement through landlord forums, sector newsletters
(most recently December 2025), and preparations for a private landlord
forum to strengthen partnership working and prevention activity.
• Temporary Accommodation Strategy 2024/29 implemented, with
delivery underway to expand temporary accommodation capacity and
progress long-term feasibility work; ongoing monitoring ensures
requirements are met and actions move forward as planned.
• Homelessness housing options pilot implemented, with the one-offer
approach extended beyond the initial six-month period to allow for
evaluation of tenancy sustainment outcomes. Implementation continues
alongside monitoring to assess impact and inform future decisions.
Tackling poverty
and preventing
homelessness
Improve support for households
who are homeless or at risk of
becoming homeless
Feb-24 Nov-28 Green At delivery and
ongoing
management
and monitoring
stage.
1 of the 4 projects / activities within this deliverable is complete:
• New housing support contracts have been implemented. 
The other 3 are underway:
• The Trauma-Informed Practice Plan is progressing, supported by a
training needs analysis and completion of Transforming Connections
training in several localities. A wider rollout is underway, and a draft
trauma service plan is being piloted by Housing for wider council use.
• A sector-wide domestic abuse practice forum is now established and
active, helping embed domestic-abuse-informed systems across
housing organisations. Planning continues for the next session.
• Work to enhance support for prison leavers continues through the
development of a new housing, prison and courts link worker role.
Tackling poverty
and preventing
homelessness
Prevent homelessness through
early intervention, education and
other support services
Jan-25 Nov-28 Green At delivery and
ongoing
management
Both of projects / activities within this deliverable are underway:
• To explore new and additional supports for care experienced young
people a group of housing and social work managers is progressing Page 39 of 454

Page 40

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
and monitoring
stage.
work to identify gaps in current provision of care. A needs paper has
been developed to inform new supported housing models, with a
potential site identified and two additional options being explored.
• A refresh of the Health and Homelessness Action Plan has been
implemented, and the group continues to update the Action Plan, using
current data and evidence to shape refreshed priorities. A draft version
of the new plan is nearing completion.
Strengthening
community
capacity and
wellbeing
Develop the council's approach
to Community Wealth Building
and associated implementation
plan to strengthen community
capacity and wellbeing.
May-23 Dec-26 Green At delivery and
ongoing
management
and monitoring
stage.
2 of the 3 projects / activities within this deliverable are complete:
• A shared partnership approach to Community Wealth Building has been
established through a draft Community Wealth Building Statement,
endorsed by the Enterprise and Fair Work Committee in November
2024 (link) and the North Lanarkshire Partnership Strategic Leadership
Board.
• Wider engagement has taken place with the community and voluntary
sector, local communities, businesses, and Elected Members to inform
the approach and build understanding and support. 
The other project / activity is underway:
• Work to finalise the Community Wealth Building Statement
implementation plan is progressing, with updates provided to the
Strategic Leadership Board in April and December 2025 following
introduction of the legislation. An October 2025 partnership session
shaped options for the North Lanarkshire approach, resulting in an
expanded working group to lead cross-agency actions. Further
engagement and preparation continue, including establishing an internal
council group and completing mapping to identify gaps and align
reporting and monitoring.
Strengthening
community
capacity and
wellbeing
Embed equalities approaches
and actions across all work with
communities to maximise the
influence, participation, and
voice of all North Lanarkshire's
citizens in the development of
communities and services.
Mar-23 Mar-27 Green At delivery and
ongoing
management
and monitoring
stage.
1 of the 2 projects / activities within this deliverable is complete:
• The council has signed up to the North Lanarkshire Partnership
CommUnity Agreement developed by VANL to strengthen partnerships
and approaches to working with the community and voluntary sectors -
as reported to the Communities Committee in April 2024 (link).   
The other project / activity is underway:
• Work is underway to ensure data and intelligence are used to capture
participation from underrepresented groups in the LOIP review process,
with new LOIPs due in 2027. A LOIP review working group has been
established and completed phase 1, including developing toolkits,
mapping equalities groups, creating an engagement log, and preparing
locality profiles. Pre-engagement activity and communications are
complete, with task-and-finish groups progressing key actions ahead of
the main engagement phase scheduled from February to October 2026. Page 40 of 454

Page 41

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
An EQIA and risk assessment have been completed, and next steps
include delivering the engagement programme, launching locality
profiles and toolkits, and continuing targeted communications.
Strengthening
community
capacity and
wellbeing
Strengthen engagement,
participation, and empowerment
across communities to develop
an integrated service offer that
meets the needs of
communities.
Oct-22 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
5 of the 6 projects / activities within this deliverable are complete:
• Fifty community groups now have resilience packs, along with two-way
radios and other equipment, strengthening their ability to respond
effectively to emergencies or local challenges. 
• Services have agreed a set of actions to embed trauma-informed
principles across health and wellbeing, employment policies, and staff
development activity. 
• The council’s volunteering approach continues to align with and support
delivery of the North Lanarkshire Partnership Volunteering Strategy. 
• Work to strengthen locality community planning links with health and
social care groups is now complete, improving co-ordination and
supporting delivery of the LOIPs. 
• A family support assessment model has been developed to enhance
engagement across the nine Community Board areas, with ongoing
learning on who uses support and how hub-based provision offers more
accessible and preventative support than mainstream services. 
The other project / activity is underway:
• Key actions from the Member Officer Working Group on the Community
and Voluntary Sector are progressing, with recent work focused on the
LOIP review, development of an engagement toolkit, soft launch of the
online grants portal, and preparations for the next meeting with VANL to
review progress and agree next steps.
Trauma informed
organisation and
service delivery
Develop a comprehensive local
Trauma Plan to ensure that
trauma informed practice and
systems are embedded within
the council's operating model.
Nov-23 Jun-24 Blue Completed or
at closure
stage.
All 4 projects / activities within this deliverable are complete:
• As endorsed by the Tackling and Wellbeing Committee in April 2023
(link), the council is committed to the implementation of the trauma
informed principles across the organisation.  A project plan has since
been developed and approved by the Wellbeing and Tackling Poverty
Committee in April 2024 (link) to create the framework for North
Lanarkshire to become a trauma-informed organisation. 
• A steering group has been established with representation from across
council services to oversee the project.
• A communications plan has been agreed and trauma principles
introduced to the council’s Operational Management Team and through
other forums to ensure awareness of the council's commitment to
become trauma informed as an organisation.
• Areas and teams have been identified to test trauma informed
approaches.
Page 41 of 454

Page 42

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
Trauma informed
organisation and
service delivery
Implement the Trauma Plan with
a focus on creating the culture
and conditions across the
council to enable staff to
respond in ways which
recognise the impacts of trauma,
promote recovery, prevent re-
traumatisation, and ensure
services and effective supports
are accessible to / effective for
those who need them most.
Apr-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
1 of the 6 projects / activities within this deliverable is complete:
• Work to embed trauma-informed design principles across schools, town
centres, community hubs, and service locations is complete, with the
Trauma Design Toolkit and MyNL pages launched in June 2025. This is
supported by a 2026 communications plan, new video content to
showcase trauma-informed design in practice, and a refreshed toolkit. 
The other 5 are underway:
• Work continues to strengthen staff care and wellbeing by embedding
trauma-informed principles across services, with wellbeing plans in
development and trauma walkthroughs in education and families’
services ongoing. The council’ Mental Health Group continues to share
targeted activity and support the next stage of this work.
• To build staff awareness and skills in trauma-informed practice, a
council-wide training plan is being implemented, supported by training
needs analysis tools and service-specific trainers. A staff leaflet and
awareness sessions are in place, and the training needs analysis tool is
being rolled out to additional services.
• Children, families, and communities continue to shape trauma-informed
services through engagement such as the parent/carer advisory board,
youth voice work and FHANS activity. The trauma lead is mapping
family journeys to guide future service design, with actions refreshed
and aligned to the LOIP review and wider partnership work.
• Evaluation methods for measuring the impact of trauma-informed
principles are being developed and tested, with pilot learning informing
next steps and plans to extend testing to two further services. 
• Managers are being equipped with trauma-informed leadership skills
through Level 1 training, Trauma in Mind and integration into leadership
programmes. A development session in September 2025 identified
leadership needs, and work is underway to produce a trauma leadership
toolkit and walkthrough guide for use in practice.
Investing in
prevention
Identify capacity to increase
proportionate spend of
prevention to support improved
outcomes for children and their
families and development of a
sustainable service model for
the future.
Nov-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
2 of the 5 projects / activities within this deliverable are complete:
• Engagement with the national Promise team is complete, with a method
developed to analyse the Human and Economic Cost of family support.
An asset map has been created in partnership, and interim finding -
presented through a composite family story - are informing next steps.
• A high-level financial review of family support functions across the
council has been completed, identifying indicative spend across direct,
indirect, statutory, and non-family-support areas. This provides a
baseline of council resources linked to family support, and this element
of the action is now complete. 
Page 42 of 454

Page 43

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
3 projects / activities are underway:
• Baseline costed analyses of individual family journeys have been
completed using Human and Economic Cost Modelling (HECM), and
work is being reset with the Promise Scotland team to confirm scope
and timelines while the Improvement Service gathers supporting
information from relevant services. 
• Engagement with families and HECM evidence-gathering is underway,
with interim findings collated and full analysis planned between January
and March to assess the impact of the hub operating model compared
with traditional approaches. 
• Development of costed, sustainable proposals for an integrated family
support model will be informed by the ongoing family support review,
with staffing costs identified, staff engagement underway, and manager
survey analysis progressing.
Investing in
prevention
Map and enhance existing cash
first and direct payments
initiatives through establishment
of a supporting framework
aligned with family support
principles to reduce stigma and
empower families and frontline
workforce to tailor solutions to
need.
Dec-23 Nov-25 Blue Completed or
at closure
stage.
All 3 projects / activities within this deliverable are complete:
• A cash-first approach to food and fuel crisis was fully implemented,
removing previous barriers identified through the food poverty referral
gateway enhancing access to direct financial support rather than
emergency food provision. The Scottish Government Cash First Project
concluded in November 2025, with evaluation work completed and final
reporting prepared for both the Scottish Government and the Wellbeing
and Tackling Poverty Committee in February 2026.
• A directory of emergency cash payments across the council has been
created, mapping existing supports and enabling a consistent and
accessible reference point for staff. This directory was reported to the
Wellbeing and Tackling Poverty Committee in February 2026, after
which it will be issued to services along with guidance to support use.
• A framework for direct payment initiatives has been established,
drawing on the pilot of cash-first food crisis payments and previous
direct payment projects to support approaches that reduce stigma and
allow front-line staff and families to tailor support to individual need. This
framework is complete and forms a key element of the integrated early
family support model and associated monitoring arrangements.
Brighter Futures [ overall completed status = 41% ]
NL academies Ensure increased skilled
workforce employed in roles
which fit industry needs and
contribute to greater economic
outputs. 
Apr-23 Aug-27 Green  At delivery and
ongoing
management
and monitoring
stage.
3 of the 7 projects / activities within this deliverable are complete:
• Delivery and evaluation of the NL Academies UK Shared Prosperity
Fund (SPF) projects is complete.
• The summer placements scheme for S4-6 pupils has been integrated
into the NL Academy model with external placement opportunities.
• University strategic partnerships have been developed linking these to
Page 43 of 454

Page 44

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber) 
industry need providing pathways towards employment. 
The other 4 projects / activities are underway:
• Targeted projects supporting key industries with skills gaps - restorative
justice and next gen summit projects completed. Remaining projects
progressing, with outcomes and outputs monitored.
• External summer placement programme, expanding Health and Social
Care and Digital enhanced - planning for the 2026 programme
underway, including demand planning and employer engagement. 
• Pathways strengthened between vocational qualifications and workforce
demand in key sectors - draft Youth Engagement Strategy for the Built
Environment developed, with structure and workstreams agreed.
Existing vocational and industry offer now being reviewed for inclusion.
• Development and implementation of the Built Environment Academy on
a phased basis - long list of options produced, SWOT analysis ongoing.
Shortlisting for full options appraisal will follow. Resourcing and
timelines require review ahead of March 2026. 
An update in respect of NL Academies was contained within the report to
the Finance and Resources Committee in September 2025, i.e. Brighter
Futures programme of work - NL Academies, (link). 
An update in respect of all Brighter Futures deliverables was reported to
Policy and Strategy Committee in September 2025, i.e. Brighter Futures
progress update (link).
NL academies Develop employer engagement
within each model to ensure full
participation and increased work
opportunities.
Apr-23 Aug-26 Green At delivery and
ongoing
management
and monitoring
stage.
Both projects / activities within these deliverables are underway
• Industry-led sector boards in the Built Environment and Health and
Social Care - both boards continue to operate well. Built Environment
workstreams are progressing quickly, with research on occupational
gaps now complete and ready to share across partners. Care Academy
workstreams are advancing, though momentum is affected by workload
and staffing changes. Resource requirements for 2026 will need
reviewed due to key posts ending.
• Digital employer engagement and partnerships strengthened to inform
development of the Digital Academy - early discussions on major data
centre investment have begun, with anticipated involvement from NL
Academies around skills and workforce needs. Ongoing monitoring and
engagement will continue as workstreams form. Wider Digital Academy
activity will be reprofiled.
NL academies Enhance attraction and advance
equalities across key industry
sectors.
Apr-23 Mar-28 Green At delivery and
ongoing
management
1 of the 5 projects / activities within this deliverable is complete:
• Recruitment and retention workstreams under each industry led sector
board have been implemented and are being monitored. 
Page 44 of 454

Page 45

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
and monitoring
stage.
The remaining 4 projects / activities are underway:
• Implementation and scale up of collaborative apprenticeships and
vocational pathways with NHS Lanarkshire and Health and Social Care
Partnerships - apprenticeships launched in August 2025 within
integrated rehab teams, leading to SCQF Levels 6 and 7. Programme
and learner progress under ongoing review.
• Increased participation of under-represented groups across NL
Academies activity - restorative justice project launched in December
2025. Outcomes and participant progression being monitored to assess
impact.
• Alignment of attraction activities to key health and social care roles
through the Care Academy - delivery framework and performance
reporting structure completed. Implementation and monitoring to follow,
with resource pressures requiring review before March 2026.
• Engagement strategy through the Built Environment Sector Board - draft
strategy produced with supporting workstreams identified. Working
groups to be established in early 2026.
NL academies Maximise opportunities to
enhance social value through
the council's procurement
activity. 
Nov-24 Dec-26 Green At delivery and
ongoing
management
and monitoring
stage.
1 of the 4 projects / activities within this deliverable is complete:
• Analysis of current procurement contracts has been carried out in
conjunction with contract managers within services to ensure social
value is maximised. 
The remaining 3 projects / activities are underway:
• Social Value Framework - framework and menu produced; consultation
planned. Chief Officer and Elected Member sessions scheduled for
early 2026 ahead of Committee consideration.
• Social value offer embedded within future procurement contracts -
ongoing engagement with contract managers. Roll-out to follow once
Framework is signed off and consultation is complete.
• Council-wide technology solution to measure and monitor social value -
early scoping of current systems undertaken. Power Bi identified for
further exploration from early 2026 after Framework finalisation.
Funding Identify all relevant funding
streams and how they fit
together.
Sep-23 Oct-23 Blue Completed or
at closure
stage.
• Complete. Desktop exercise is complete in respect of identifying all
funding streams to identify how they align and integrate.
Brighter futures
curriculum and
pathways
Expand pathways and
progression routes within key
industry sectors to connect to
employment.
Jan-23 Jun-27 Green At delivery and
ongoing
management
and monitoring
stage.
2 of the 4 projects / activities within this deliverable are complete:
• Plan established (via the vocational education multi-agency steering
group) to refresh and relaunch the enterprise curriculum, pathways, and
certification in order to progress and facilitate growth and expansion of
Foundation Apprenticeships, Higher National Certificates, and
vocational education in growth job sectors.  Page 45 of 454

Page 46

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
• Secondary schools are now fully incorporating labour market
intelligence into their curriculum rationale, supported by an established
quality assurance cycle for programmes delivered with partners. This
action is complete, with next steps moving to a separate review of the
secondary improvement cycle to further enhance pathway development. 
The remaining 2 projects / activities are underway:
• Launch and promotion of the wider achievement catalogue (SCQF 3-7)
and expansion of enterprise / wider achievement opportunities -
catalogue launched for the 2025/26 academic session. Work is
underway with the Curriculum Manager (Digital) to support rollout and
promotion across all schools.
• Senior phase curriculum aligned to learner needs and labour market
demand, with a focus on young people facing barriers - curriculum
pathways developed across key growth sectors - built environment,
health and social care, hospitality, and creative industries - at SCQF
levels 4-7. Expansion continues to widen frameworks, increase levels,
and boost pupil engagement.
Brighter futures
curriculum and
pathways
Grow full range of school
vocational pathways for core
sectors, including STEM
(science, technology,
engineering, and mathematics),
digital skills, construction, and
health and social care.
Jan-23 Jun-27 Green At delivery and
ongoing
management
and monitoring
stage.
3 of the 6 projects / activities within this deliverable are complete:
• For the 2023-24 session, all vocational pathway courses to widen
achievement and expand opportunities were fully delivered, including
strengthened progression routes in literacy, numeracy, digital literacy
and computing. A quality assurance cycle is now in place to monitor
delivery with partners.
• Future Fridays programme has been delivered, providing young people
with meaningful skill-building, practical experiences, and accredited
opportunities that help prepare them for life beyond school and the
world of work.
• STEM and digital skills have been promoted across the curriculum
through cross-curricular projects, a literacy-linked STEM pilot, and
Glow-wide live code-along sessions, embedding digital learning and
strengthening STEM engagement for learners. 
The remaining 3 projects / activities are underway:
• Curriculum pathways across built environment, health and social care,
hospitality and creative industries have been expanded at SCQF levels
4-7, with a dedicated ASN curriculum review underway. Core funding is
secured, and work continues to extend pathways from SCQF 3-7 while
increasing frameworks, levels, and pupil participation.
• STEM and digital skills are now embedded across the curriculum
through established projects, including national games week, eight
digital literacy and computing sessions, and the rollout of a nonfiction
Page 46 of 454

Page 47

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
STEM-themed reading programme. This work strengthens
comprehension while deepening links to science and technologies.
• Further STEM literacy and digital learning support is progressing
through ongoing collaboration with Education Scotland, new Tech
Tuesday’s resources, and a developing P4-S2 programme. Trialled
lessons show strong engagement, and materials are being refined for
wider rollout to help teachers embed literacy-driven STEM learning.
Brighter futures
curriculum and
pathways
Advance equalities within
curriculum pathways 3-18 years.
Jan-23 Jun-27 Green At delivery and
ongoing
management
and monitoring
stage.
3 of the 5 projects / activities within this deliverable are complete:
• A plan to advance equalities within curriculum pathways has been fully
developed and implemented through the Advancing Equalities Forum.
This includes the recruitment of job coaches to support young people
with additional support needs in preparing for life beyond school,
alongside the integration of equalities within the National Certificate
curriculum rationale and training for all Heads of Establishment.
• The employability pathways programme within the We Aspire Social,
Emotional and Behavioural Needs College has been launched,
providing targeted opportunities and structured support to help young
people progress toward positive, sustainable post-school destinations.
• Curriculum rationale session offered on ensuring equality within the
vocational curriculum to all heads of establishment. 
The remaining 2 are underway:
• New vocational education bungalow at Our Lady’s High School -
renovation is complete and young people with multiple barriers to
learning are using the space regularly. Next steps focus on increasing
usage, celebrating learning, and widening promotion.
• Staff training across all establishments in LGBT awareness, rights
respecting schools’ initiatives, gender-based violence awareness, and
mentors in violence prevention - work across all areas is progressing
well, most schools are advancing through the rights respecting schools’
initiative and are progressing from previous levels.  LGBT inclusive
education training continues and the mentors in violence prevention
programme is active in several secondary schools, supported by trainer
development to enable rollout across all secondary schools. 
Brighter futures
curriculum and
pathways
Map, develop, and implement
play-based approaches in early
years to develop a full play-
based learning offer.
Jan-23 Jun-24 Blue Completed or
at closure
stage.
• Complete. Play based approaches have been mapped across primary
and are intrinsic to early years delivery.
• In collaboration with early learning and childcare, through 1140 hours
funding, two education support officers have been appointed to take
forward developments in play and enquiry and develop approaches to
play across early level in first and second level during a 23-month
secondment. An initial test of change will be conducted with a small,
Page 47 of 454

Page 48

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
targeted, focus group of schools.
Employability
and community
learning and
development
Address the current challenges
of North Lanarkshire’s labour
market including the rise in
economic inactivity alongside
unemployment 
Apr-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
1 project / activity within this deliverable is complete: 
• Local labour market challenges - including rising economic inactivity and
unemployment - have been addressed through regular updates from
employability partners, providing current insight and comparison with
pre-pandemic labour market conditions. This work has strengthened
understanding of local trends and informed targeted responses across
programmes. 
The remaining project / activity is underway:
• New programmes launched in April 2025 to tackle unemployment and
economic inactivity have engaged 1,900 residents by December,
including 387 economically inactive individuals. Of the 1,059 residents
supported into work, 14% were previously inactive. Performance
remains on track to meet annual targets, with expected increases in
referrals in February, though economically inactive participants continue
to require longer support to achieve sustained employment.
Employability
and community
learning and
development
Ensure continued expansion of
supported employment
programmes, increase
opportunities for North
Lanarkshire Industries to
diversify and integrate these
with wider employability support.
Oct-23 Mar-26 Green At delivery and
ongoing
management
and monitoring
stage.
• An Action Plan for North Lanarkshire Industries is in place for 2024-26. 
Supported employment programmes have expanded, and North
Lanarkshire Industries (NLI) continues to diversify through sustained
internal and external orders, including furniture production, upholstery
work and community support services. The No Limits programme
achieved strong results, with most participants progressing into
employment, while the Blissful Bundles enterprise continues to grow
through schoolwork experience and pop-up events. The first
NOLB-funded supported placement has begun, and NLI will continue
furniture production for sheltered housing refurbishments into 2026.
Employability
and community
learning and
development
Develop and embed the
Employer Charter within a
broader range of businesses.
Apr-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
• Currently, 82 employers are accredited, with 6 pending and 5 ready for
accreditation. Engagement activity remains strong, with a Business
Breakfast in November attracting around 50 local employers and
featuring business support partners and a member spotlight on WH&R
McCartney. Visibility has increased through the growing NL Employer
Charter LinkedIn page, which is now a key channel for showcasing
employers and good practice. Ongoing priorities include continued
direct promotion of the Charter, strengthened collaboration with internal
services, active participation in business events, and delivery of the third
Business Breakfast in March 2026 to maintain momentum and deepen
employer engagement across North Lanarkshire.
Employability
and community
learning and
Ensure integration of external
employability funding with
council led programmes via
Jan-23 Mar-26 Green At delivery and
ongoing
management
1 project / activity within this deliverable is complete:
• External employability funding has been fully integrated with council-led
programmes through the Local Employability Partnership, with two Page 48 of 454

Page 49

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
development Local Employability Partnership. and monitoring
stage.
UKSPF employability support projects delivered and evaluated up to
March 2025 and aligned with funding to ensure a co-ordinated,
sustainable approach. 
The remining project / activity is underway:
• Since launching in April 2025, the project has engaged 776 residents
(14% economically inactive) against a target of 648, with 563 moving
into work, though fewer than 10% were economically inactive clients.
Wider programmes have supported over 100 economically inactive
people into employment, and a focused review next quarter will aim to
increase outcomes for this group while maintaining strong performance
in engagements and job conversions to the end of March 2026.
Employability
and community
learning and
development
Create and implement a
development plan focused on
delivering numeracy
programmes to adults aged 16+
to meet objectives of Multiply/UK
Prosperity fund. 
Jan-23 Mar-26 Green At delivery and
ongoing
management
and monitoring
stage.
• The Sum It Up team has launched a new Men and Music programme in
Bellshill, work continues with the Church of Scotland in Wishaw
delivering SQA units and cooking workshops, and environmental
workshops have been delivered in Airdrie and with the Recovery Café
Cumbernauld. To date, 264 SQA units have been achieved, with 184
learners registered since April and strong contribution to the wider 4,006
community learning and development learning outcomes. New activity
in January 2026 includes a National 4 programme with New College
Lanarkshire and a finance course based on Living Life to the Full, with
final-quarter delivery focused on finance and health before progressing
local growth fund objectives into 2026-27.
Employability
and community
learning and
development
Create a community-based
employment opportunity within
the council for up to 18 young
people aged 19-24 years who
experience multiple barriers to
learning and employment. 
Apr-24 Mar-26 Green At delivery and
ongoing
management
and monitoring
stage.
• 17 participants continue to develop workplace skills through Autism
Awareness, SQA Digital Basics, Mental Health Awareness, weekly
Active NL health sessions, and First Steps to Volunteering, with growing
responsibility in their placements and community learning and
development feedback shaping next-stage learning. Individual actions
within each learner’s plan are being progressed along with delivery of
higher-level digital skills and SCQF Level 5 Family Learning, with three
participants expected to complete the Lowland Leader Award to support
future applications within Duke of Edinburgh service delivery.
Employability
and community
learning and
development
Develop and deliver
employability pathway for
Resettled Scots including
Unaccompanied Asylum-
Seeking Children (UASC)
building in accreditation through
Scottish Qualification Authority
(SQA) qualifications. 
Feb-24 Mar-26 Green At delivery and
ongoing
management
and monitoring
stage.
• Between October and December 2025, the Adult Learning and
Resettlement Team delivered 67 tailored ESOL and resettlement
projects engaging 166 participants, achieving 132 SQA awards and
contributing to 1,024 ESOL learning outcomes in the first half of 2025–
26. The new ESOL Employability course supported seven learners
through three weeks of employability-focused ESOL followed by a
three-week placement with council facilities, with participants recently
interviewed for posts. Work continues with New College Lanarkshire on
progression routes, and a new cohort plus ESOL Driving Theory classes Page 49 of 454

Page 50

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
- offered in person and online - will launch in spring to further strengthen
employability and independence.
Employability
and community
learning and
development
Develop and implement a
comprehensive learning
programme where 50% of
learners who achieve a core
skills qualification will reside in
the top Scottish Index of Multiple
Deprivation (SIMD) 1 and 2 data
zones.
Mar-24 Mar-26 Green At delivery and
ongoing
management
and monitoring
stage.
• Q2 data shows strong performance, with 468 core skills achievements -
43.2% from SIMD 1 and 2 areas - including 242 numeracy, 140 IT, 53
communication, 19 working with others and 14 problem solving,
alongside 404 national qualifications for adults and 1,298 youth
accredited awards. By the end of Q2, community learning and
development had supported 5,164 individuals, 41% from SIMD 1 and 2
areas, and delivered six local sessions to strengthen targeted delivery
using data and heatmapping. Work continues into Q4 on reviewing
literacy and communication provision and undertaking six
peer-evaluation visits using the how good is our community learning and
development framework to inform the next community learning and
development service plan.
Volunteering Establish volunteer baseline,
covering current activity, training
received, and availability for
broader opportunities.
May-23 Mar-26 Green At delivery and
ongoing
management
and monitoring
stage.
1 out of the 2 projects / activities within this deliverable is complete:
• Engagement with services in the council has been concluded to
understand the use of volunteers, and meet with community groups,
Community Boards, and VANL to identify existing demand and potential
for growth. 
The other project / activity is underway.
• Volunteering activity slowed in the pre-Christmas period, but partnership
links have strengthened, particularly through collaboration with the
Community Wish List team to connect the volunteer system (Rosterfy)
with supporting IT systems. New employer-supported volunteering
opportunities have been developed, including projects benefiting local
schools, and work continues to grow options aligned to the community
wish list while deepening engagement with local companies.
Volunteering
Map community partnerships
who offer volunteering
opportunities and the current
offer (baseline).
May-23 Mar-24 Blue Completed or
at closure
stage.
• Complete.  Volunteer role profiles have been developed, and details
gathered on opportunities and forthcoming projects / events for
signposting to interested volunteers.
Volunteering Implement and maintain a
system capable of capturing
volunteers, skills, training, and
opportunities available.
Oct-23 Mar-26 Green At delivery and
ongoing
management
and monitoring
stage.
1 out of the 3 projects / activities within this deliverable is complete:
• Volunteer management system has been secured (Rosterfy) and
developed to support development and recognise contribution, focusing
on gaining qualifications which will help with career development. 
The other 2 projects / activities are underway:
• Work with stakeholders - including Education and Families, New
College Lanarkshire and Voluntary Action North Lanarkshire continues
to expand accreditation opportunities, with the Volunteer Awards
Page 50 of 454

Page 51

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
recognising a number of young people both at the event and through
follow-up social media promotion. Further development of these
opportunities is ongoing.
• Work with New College Lanarkshire and training providers is
progressing to create qualification routes that support volunteers into
employment or further learning, with new opportunities being developed
alongside the council’s training and development team preparations
underway to begin rolling out training opportunities.
Volunteering Implement and maintain a front-
end website (one stop shop) for
volunteering in North
Lanarkshire.
Oct-23 Mar-24 Blue Completed or
at closure
stage.
• Complete. QR codes for the Roserfy volunteer management system
have been developed to improve accessibility from a range of council
venues and service delivery points.
Volunteering Support the delivery of
qualification options for
volunteers.
Mar-24 Mar-26 Green At delivery and
ongoing
management
and monitoring
stage.
Both projects / activities within this deliverable are underway:
• Work continues to support accreditation options, with the Volunteer NL
project progressing toward SQA accreditation at SCQF Levels 3-5. The
SQA application has been submitted, and final approval now depends
on staff completing their Assessor / Verifier qualifications. Both are
enrolled on a fast-track programme, and once completed, the project
will be able to offer an expanded range of SQA-accredited qualifications
for volunteers.
• Action continues to develop a flexible suite of qualification options to
support volunteers in progressing toward their learning and employment
goals, with ongoing collaboration with the council’s training and
organisational development team to create a volunteer training
calendar; roll-out of new training opportunities is scheduled shortly.
Entrepreneurship Map current entrepreneurship
and self-employment provision
across North Lanarkshire.
Apr-23 Mar-28 Blue Completed or
at closure
stage.
All 3 of the projects / activities within this deliverable are complete:
• Mapping of all existing entrepreneurship support and activity taking
place across North Lanarkshire (in terms of provision, geography, and
target groups) has been carried out.  
• Availability and access to finance for entrepreneurs and business start-
ups is also completed.
• Start-up funding has been reviewed with new scheme developed.  
Entrepreneurship Develop entrepreneurship
activities to drive activity where
gaps and provision from the
mapping exercise have been
identified.
May-23 Mar-26 Green At delivery and
ongoing
management
and monitoring
stage.
2 out of the 7 projects / activities within this deliverable are complete:
• Options appraisal on future delivery of Business Gateway services
completed with the outcome reported to committee and services
insourced.
• An overview of the activities and performance achieved during the first
year of an in-house delivery model of the Business Gateway
Lanarkshire service was reported to the Enterprise and Fair Work
Committee in August 2025 (link). 
Page 51 of 454

Page 52

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
5 projects / activities are underway.
• Routeways into self-employment developed - follow-up activity in
October 2025 confirmed two individuals have now started trading and
six continue to receive support, with plans in place for the next cohort. 
• Start-up funding introduced from pre-start to 12-month trading - since
April 2025, nine start-up grants totalling £21,646 have been paid, with a
further sixteen awards worth £25,082 approved. Ten additional
applications, totalling £20,000, are currently being appraised, with
£83,000 remaining in the budget and ongoing promotion through
Business Gateway and council marketing.
• Activities to address demographic and geographic gaps - using
Business Gateway data, targeted start-up Bootcamps have been
delivered across priority areas in North Lanarkshire, and dashboards
enhanced to include established business data. Further analysis of
banking and limited company information is underway, with an additional
review scheduled to inform 2026/27 operational planning.
• One-to-one support, workshops, surgeries and networking continued via
Business Gateway - provisional Lanarkshire results to November 2025
show 459 start-ups, 76 new business plus clients, 59 local priority
clients, and 10 growth businesses, alongside wide-ranging workshops,
marketing, and specialist support.
• Lanarkshire Business Gateway and wider business support - monthly
monitoring and review activity continues, with work underway to assess
2025/26 delivery and prepare plans for 2026/27. Business support
paper reported to the Enterprise and Fair Work in February 2026 (link).
Entrepreneurship Advance equalities and deliver
targeted entrepreneurial support
to under-represented groups
through bespoke interventions.
Oct-23 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
2 out of the 7 projects / activities within this deliverable are complete:
• Dedicated co-working space established for women in Airdrie (through
UKSPF funding).
• Opportunities explored for alternative inclusive ownership models in
North Lanarkshire (linked to community wealth building) through
discussions with Business Gateway, Enterprise Development, and Co-
operative Development Scotland to develop a programme for
implementation. 
5 projects / activities are underway.
• Tailored business start-up support delivered for Black, Asian and
Minority Ethnic communities - physical delivery concluded on 30
September, with 23 verified events delivered between April and
September and 298 North Lanarkshire residents engaged overall. Work
is now focused on finalising outputs, confirming the final UKSPF claim
and progressing the externally commissioned evaluation, with results
due this quarter. Page 52 of 454

Page 53

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
• Creation and growth of social enterprises supported, and North
Lanarkshire Social Enterprise Network strengthened - through the
UKSPF project, one-to-one support has been provided to 21
organisations, three network meetings have been held and work
continues with New College Lanarkshire on developing a new social
enterprise and delivering specialist training. A draft Social Enterprise
Strategy 2026-30 has been produced, nominations are being sought for
an industry chair, and an online social enterprise map is planned.
• Women’s co-working space in Airdrie delivered and uptake assessed as
well as impact and future feasibility - by the end of December, 24 users
had active workspace plans and income of £4,337.82 was generated
between October and December, with additional meeting-space users
booking regularly. Promotion and programme delivery continue,
alongside work on an options appraisal for the future operating model
and evaluation activity.
• Levels of female entrepreneurship increased through mentoring,
workshops and targeted support - October-December delivery included
four events at The Hive, eight one-to-one mentoring sessions, two
Funding Fridays and support to 28 individuals, alongside school
engagement where 58 young people participated in Bee Your Own
Boss. Ongoing work includes continued mentoring, workshops,
surgeries, exploration of a Routes into Care self-employment course
and continued school-based enterprise activity.
• Programme to embed alternative ownership models linked to
community wealth building in delivery - changes in national support
structures have required the care-focused micro-enterprise model to be
reworked, creating some development delays and necessitating further
research. An alternative pathways-to-self-employment event is being
developed, with continued engagement with Health & Social Care and
the Care Academy, and promotion of alternative models through
Business Gateway start-up sessions.
Entrepreneurship Expand experiential
entrepreneurial activities and
pathway programmes within
education curriculum.
Aug-23 Jun-26 Green At delivery and
ongoing
management
and monitoring
stage.
1 out of the 3 projects / activities within this deliverable is complete:
• The enterprise pathways and enterprising schools award model is in
place with school sessions to the Smart Hub now ongoing.   
2 activities / projects are underway.
• Enterprise pathway and enterprising schools award model delivered
across education, with progress demonstrated through the November
Enterprise Showcase at Bellshill Academy, increased school
participation in Dragons’ Lair, national competition success through the
King’s Trust Challenge, strong registration levels for the Young
Enterprise Circular Economy Challenge, and ongoing activities such as Page 53 of 454

Page 54

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
the YPI Inclusion pilot.
• Delivery of school engagement through Smart Hub Lanarkshire ongoing
to promote STEM careers, with engagement activity now complete
across six schools and 92 pupils, and the project moving into evaluation
to determine impact and next steps, including consideration of a spring
technology showcase and scoping ongoing resource needs for delivery
beyond March 2026.
Digital North Lanarkshire [ overall completed status = 40% ]
Digital culture,
leadership, and
knowledge
Create a mature and
sustainable culture across the
organisation to ensure that
digitisation of council services
provided to the public
successfully transition them to
achieve the outcomes specified
within The Plan for North
Lanarkshire. 
Sep-23 Nov-26 Green At delivery
and ongoing
management
and
monitoring
stage.
4 out of the 8 projects / activities within this deliverable are now complete:
• Research was completed to understand the five steps to change in
preparation for digital maturity assessment.
• Outputs from the health and social care digital maturity work were
shared with the digital culture, leadership, and knowledge activity group
to inform the council's digital maturity assessment.
• The digital maturity assessment has been undertaken with the digital
culture, leadership, and knowledge activity group.
• To support the digital maturity assessment, an update was provided to
the Finance and Resources Committee in November 2024 (link) on 
progress in digital adoption and findings from the staff digital maturity
survey, where 82% of respondents recognised the alignment between
digital change and The Plan for North Lanarkshire, and highlighted
improvements in collaboration, efficiency and productivity. Further work
focused on strengthening support for staff - particularly under-25s - in
adopting new technologies and embedding digital culture change. 
The remaining 4 projects / activities are closely interrelated, and
implementation is being co-ordinated across the workstream:
• Workshops informed development of a plan centred on engagement,
digital champions, training, competencies, and digital etiquette, with
activities delivered including you said, we did feedback, annual
surveys, a 12-month digital communications plan, digital rebranding,
and a review of industry best practice to establish a model for reporting
progress towards a sustainable positive digital culture.
Digital culture,
leadership, and
knowledge
Develop digital leaders to
facilitate behavioural change
required to enable service
transformation within existing
resources. 
Nov-23 Mar-26 Amber At delivery
and ongoing
management
and
monitoring
stage.
2 out of the 4 projects / activities within this deliverable is now complete.
• Research on digital champions and leaders clarified the skills required
to drive innovation, support teams, and strengthen engagement. This
insight is now shaping leadership development programmes to embed
stronger digital capabilities, including cognitive, behavioural, and
emotional transformation.
• A full review of the Digital Champion / Leader role was carried out,
Page 54 of 454

Page 55

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
informed by current research, resulting in a role profile aligned with
service needs. This has enhanced digital leadership across the
organisation and supports continued progress in digital transformation. 
The remaining 2 projects / activities are underway:
• To develop a competencies framework, informed by available models
and stakeholder consultation - early drafts have been discussed with
the Board and the Digital Adopter Group, with feedback highlighting key
themes and the need for alignment with M365 dashboards. Further
work is required to agree next steps delivery, develop linked training
materials, and finalise the framework. An extension has been made to
align timescales with related digital etiquette activities.
• To review options for resource optimisation to support the Digital
Champion / Leader role, including potential incentives, protected time,
and dedicated staffing - findings and recommendations will be
established to strengthen digital support across services.
Digital culture,
leadership, and
knowledge
Develop and deploy a self-
adapting redesign framework to
accelerate digital business
transformation of critical council
functions. 
Sep-23 Mar-24 Blue Completed or
at closure
stage.
Upon completion, the change management toolkit portal was demonstrated
at the Programme of Work Board in December 2024.
Digital culture,
leadership, and
knowledge
Support development of a
skilled workforce to foster
consistent knowledge, improve
digital adoption, and accelerate
digital-first business
capabilities.
Mar-24 Nov-26 Green At planning
and set up
stage.
1 out of the 5 projects / activities within this deliverable is now complete.
• Work is complete to assess the impact of service-wide digital
transformation, evaluating system changes and capturing insights to
inform future user experience improvements. 
The remaining 4 projects / activities are underway:
• Digital guidance and etiquette - this aims to update digital guidance and
etiquette, so it remains accurate, relevant, and supports stronger digital
engagement, including updates to the Code of Conduct training. Initial
activity focused on the Digital Adoption Framework, with research on
digital etiquette informing a presentation to the Board and establishing
a solid foundation for the work. Next steps are to finalise updated
guidance and training materials.
• Self-help portal - work has begun to explore a self-help portal / channel
for staff to share experience and knowledge. With the new Digital Early
Adopters Group now established, development will progress toward
completion by March 2026.
• Digital skills self-assessment tool - initial scoping has taken place for a
self-assessment tool linked to the future Competencies Framework.
This action will proceed once the framework is completed and
Page 55 of 454

Page 56

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
approved, with ongoing input from the supporting working group.
• Training resource protocol - work is underway to create a protocol for
using and updating external training resources (e.g. YouTube) with
proposals scheduled to be presented to the Digital Early Adopters
Group, within a revised completion date of August 2026.
Improved
customer
experience
Develop customer’s digital skills
and knowledge to enable
access to online and self-
service activities, whilst
ensuring digital inclusion and
no one is left behind. 
Apr-23 Dec-26 Green At delivery
and ongoing
management
and
monitoring
stage.
8 out of the 15 projects / activities within this deliverable are complete:
• Systems and portals developed enabling residents to engage, report
issues, request services, and make payments online. The council
website now includes MOT / taxi compliance, roads and streetlighting
reports and requests, waste service requests, traffic signal reports, and
the ability to apply and pay for permits and business grant applications.
• Chatbot functionality introduced providing automated responses and
access to live advisors. 
• Customer relationship management system re-developed to enhance
processes for staff to route enquiries to the relevant service and
improve cross service working and thereby a one council approach.
• Roadmap for service redesign established to support the council’s
future operating model in hubs. 
• Standardised Purchase-to-Pay system redesigned and implemented,
enabling full electronic invoicing across the end-to-end process - from
identifying the need for goods or services through to supplier payment.
• Digital asset map developed to capture community digital activities and
promote the tool to users. 
• Digital intergenerational project expanded along with an ongoing
support model.  The Driving Digital Locally Intergenerational Project
won a Municipal Journal Achievement Awards 2025 (link). The project
pairs young people with older residents for one-to-one digital training,
with 90% of participants reporting increased confidence and praising
the relaxed, fun learning environment. 
The remaining 7 projects / activities are underway:
• Communication channel review - work is underway to update the
review with new data and media insights. Service changes and
resourcing delays mean the deadline has been extended to June 2026. 
• British Sign Language (BSL) service access videos - funding has been
secured and services have been invited to submit content for the
development of BSL videos explaining how to access council services.
• Promotion of easy read - plans to roll out a new Equality outcome in
practice are underway with communications and promotion to follow.
• Equalities guidance for services - draft guidance has been developed
and presented to all Programme of Work Boards - next steps will
Page 56 of 454

Page 57

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
include a communications plan to support implementation.
• Digital communications for Community Hubs - this is on track, Hub
newsletters are live with strong engagement, OneLan digital screens
are installed, training is in progress for co-ordinators, webpages have
been structured and are in the process of being updated. 
• Digital community benefits opportunities - engagement is ongoing with
the digital sub-group and council contractors to identify and develop
digital community benefit opportunities for local communities.
• Digital zones pilot - public consultation is complete, with the results
used to identify requirements for people with additional support needs. 
Adaptive technology has been installed in both zones, and its use and
effectiveness are being monitored to ensure there are no barriers to
access. Findings have been shared with the digital zones group and
work is underway to develop recommendations for a future model.
Improved
customer
experience
To implement digitally-enabled
facilities, services, and
experiences that are user-
friendly and accessible for all.
Sep-23 Mar-26 Green At delivery
and ongoing
management
and
monitoring
stage.
1 of the 3 projects / activities within this deliverable is complete:
• All four immersive experience rooms have now been upgraded or
developed and are fully operational, enhancing digital experiences for
communities and supporting digital skills development. Community use
is strong in Motherwell and Summerlee, with uptake growing in Airdrie
since opening in early 2025. Updates on progress and impact were
provided to the Communities Committee in October 2024 (link) and
August 2025 (link). 
The other 2 projects / activities are underway:
• Work to develop a model that enables customers to sign up for online
services has progressed, with project resourcing now in place until
March 2026 and a proof-of-concept running to June. System build is
underway, stakeholder engagement and room assessments are
complete, and an agreed schedule of activities is in place - though
capacity has remained the main risk. Next steps include staff testing
and rolling out the pilot phase.
• To review and implement technology solutions to support customers
with additional needs and remove barriers to accessing digital services
- the next phase will involve finalising the options appraisal and
beginning implementation of agreed solutions to ensure services are
accessible and inclusive for all users.
Improved
customer
experience
Ensure an accessible and
single source approach to data
that supports the organisation
by providing insights and
Oct-24 Jun-26 Green At planning
and set up
stage.
This deliverable, previously four separate activities, has been streamlined
into a single, integrated approach to strengthen data capability across the
organisation. Development work has scoped the purpose and content,
identifying existing components to be incorporated and gaps to be
Page 57 of 454

Page 58

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
evidence that support decision
making, planning, delivery, and
continuous improvement as
well as public reporting and
transparency.
addressed. Engagement is now underway with industry experts to shape
the technical foundations.
Improved
customer
experience
Research and explore
emerging technology
opportunities that align with the
council’s Automation and
Generative Artificial Intelligence
(GenAI) Framework. The goal
is to stay ahead of
technological trends and use
innovation to create more
efficient, automated services
that improve customer
experience and better support
service users.
Jan-24 Dec-27 Green At delivery
and ongoing
management
and
monitoring
stage.
Both projects / activities within this deliverable are underway:
• In respect of delivering the intentions outlined in the Digital and IT
Strategy - this quarter focused on discovery work to identify operational
AI opportunities, strengthening the foundation for future digital
improvements. Next quarter, activity will centre on improving the
customer experience and enhancing digital access in hubs, while
operational pilots continue to progress.
• Next steps implementation of the Automation and Generative Artificial
Intelligence (GenAI) Framework included deploying Teams Premium for
meeting summarisation, adopting Copilot as a standard productivity
tool, and using Copilot Studio to run a simple chatbot for improved
website navigation. A pilot is also being developed to use an AI agent to
ingest an MS Access database and generate a Power App prototype,
testing a scalable approach for moving legacy Access databases. 
Digital first
operations
Ensure useful, secure,
compliant, and digital first
applications are available to
support critical but streamlined
service delivery. 
Jan-23 Mar-28 Amber At delivery
and ongoing
management
and
monitoring
stage.
3 out of the 9 projects / activities within this deliverable are complete.
• New case management and scheduling system for social care.
• Review of long-term options for financial management - phase 1 of the
review is complete, assessing current financial tools, long-term
suitability, and opportunities for automation and self-service.
Recommendations will inform phase 2 work.
• Automation and Generative AI Framework - approved in September
2024, this sets out the council’s AI vision and governance model. Work
is underway to develop an implementation plan and identify use cases. 
The remaining 6 projects / activities are underway:  
• New housing and asset management system - the first data migration -
covering people, properties, and core rent data - has been completed
from the existing Housing Services Management System into the new
Civica system. Workshops and process-mapping activities continue to
inform system configuration. Data quality and integrity work is
underway following the initial migration to ensure accuracy before
subsequent data loads.
• Leisure and facilities booking systems with secure payment integration
- delays caused by chip-and-pin upgrades and the database upgrade
have slowed implementation of hub-based bookings; however,
Page 58 of 454

Page 59

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
chip-and-pin rollout was completed in January 2026, and the database
upgrade is scheduled for March. These dependencies are expected to
be resolved by early April, enabling configuration work to continue,
including building community-based asset bookings.
• Review and consolidation of asset management practices and systems
- progress continues at an amber status due to variable resource
availability across services and slower adoption of revised practices.
The long project timeline means this is not yet critical, but ongoing
engagement with service areas will be required to maintain momentum.
• Portfolio of case management systems and assessment process - the
assessment template has been completed, incorporating both generic
and service-specific criteria. The process for evaluating existing
systems and new requests is now in place. Assessment of Microsoft
Dynamics is ongoing, with upcoming assessments planned for
ServiceNow, Mosaic, and remaining case management systems.
• Telephony systems review and implementation of a cloud-based
Microsoft Teams integrated solution, incorporating virtual voice and
digital assistant functionality - phase 1 delivery is nearing completion,
with six outstanding tasks due by March 2026. Contact Centre and
education migrations are complete, corporate migrations are 95%
complete, and e-mail blending remains outstanding and subject to
testing. Scoping for phase 2 is underway. 
• Standardised catalogue of online technology solutions for self-service -
progress remains slow due to long-term absence and subsequent
vacancy. Work will continue at a reduced pace until capacity is
restored, with prioritisation focused on defining minimum viable
catalogue content to support early stages of self-service adoption.
Digital first
operations
Facilitate fibre-enabled
innovation to maximise the full
potential of Internet of Things
(IoT) and Artificial Intelligence
(AI) technologies in service
delivery. 
Apr-23 Mar-28 Amber At delivery
and ongoing
management
and
monitoring
stage.
3 out of the 8 projects / activities within this deliverable are now complete.
• New Wide Area Network (WAN) solution - implementation of the
procured WAN, including internet breakout services and fibre
deployment across North Lanarkshire, is complete. An update was
provided to the Finance and Resources Committee in February 2025.
• Internet access for temporary accommodation -  delivery plan has been
completed, and a call-off contract is now in place to provide internet
access across temporary accommodation properties.
• Community access to immersive pods - four immersive rooms are fully
operational at Airdrie Library, Motherwell Library, Summerlee Museum,
and Muirfield Community Centre, providing advanced sensory
technology support (e.g. in respect of mental health and employability). 
The other 5 projects / activities are underway:
Page 59 of 454

Page 60

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
• Council-wide public Wi-Fi service - the programme is nearing
completion, with town-centre transitions still outstanding. All high
schools have moved to separate controllers, resolving congestion
issues. Capacity constraints required re-baselining, and a redesigned
school environment is currently being tested.
• Opportunities for Internet of Things (IoT) use - work is underway to
identify suitable IoT use cases and develop an appropriate governance
model to support consistent, safe deployment across the council.
• Strategy to provide internet access to residents across North
Lanarkshire - a project plan has been developed, supported by ongoing
work to enhance fibre availability across North Lanarkshire as a
foundation for wider resident access.
• Smart Park pilot scheme - pilots at Palacerigg Country Park and
Strathclyde Country Park are now live, with renewable-powered,
fibre-connected units in place. Data capture is ongoing to inform a
business case for potential wider rollout.
• Digital infrastructure toolkit for third-party connectivity providers -
discussions continue on whether a deliverable toolkit is feasible, work
includes exploring reuse of the third party infrastructure model.
Digital first
operations
Transition from using paper-
based storage to a digital
solution for retaining
appropriate council information.
Sep-23 Mar-25 Blue Completed or
at closure
stage.
Contract awarded and commenced April 2025.
Performance
optimisation
Develop an efficient digital and
IT cost model to ensure scarce
financial resources are aligned
to vital enabling technologies. 
Oct-23 Sep-26 Green At delivery
and ongoing
management
and
monitoring
stage.
Delivery of the 2 projects / activities within this deliverable are underway.
• Work is underway to map digital and IT spend across the council and
assess whether it is essential or priority. This is a complex task due to
the large number of applications in use and limited historic data on
users and contracts, requiring additional time for accurate data capture
and risk-based analysis. Although progress has been slower than
planned, the overall March 2026 delivery date remains on track.
• Structures and processes are now in place to support operational
innovation and service transformation through stronger supplier
relationships. Funding has been re-profiled and eligibility criteria
approved, with details reported to the Finance and Resources
Committee in February 2025 (link).  Current work focuses on identifying
flagship examples for innovation and best practice.
Performance
optimisation
Enhance security monitoring to
maintain effective access and
control over council data as the
Feb-24 Dec-27 Amber At delivery
and ongoing
management
Delivery of the 3 projects / activities within this deliverable is underway.
• Security monitoring metrics - new security performance metrics
implemented; enhancements ongoing to improve insight and
Page 60 of 454

Page 61

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
council delivers the anticipated
increase in its digital footprint. 
and
monitoring
stage.
comparability.  Work progressing toward a framework that supports
future benchmarking against peers.
• Supplier data and assessment framework - framework rollout is
dependent on availability of service-level resources and live Service
Now reset; spreadsheets being used short-term.  Proof-of-concept
underway to test and refine the model before organisation-wide
adoption. Staff engagement, proof-of-concept design, and launch
planned for completion by March 2026.
• Security controls assessment model - timeline for security standards
agreed and assessment tool for vulnerabilities selected. Current focus
is on completing the standards, building the wider framework, and
enhancing vulnerability management processes. Development of the
compliance reporting framework still to commence.
One Service [ overall completed status = 33% ]
Workforce Further develop workforce plans
to ensure appropriate
succession planning and
alignment to the overall
Programme of Work.                                                                                                                                            
Apr-23  Apr-28 Green At delivery and
ongoing
management
and monitoring
stage.
Delivery of the 3 projects / activities within this deliverable is underway:
• Workforce and structural changes - support for changes arising from the
operating model and One Service programme continues in partnership
with services and Trade Union colleagues. 
• Workforce plans - development of the next iteration of workforce plans 
(covering internal and external challenges, capacity planning, and
focussed implementation plans) is now complete. Delivery of actions
from service workforce plans is underway. A progress update, including
the One Workforce Plan and strategic workforce priorities to 2028, was
presented to the Policy and Strategy Committee in December 2025
(link), alongside work responding to the Best Value recommendations
following the 2025 thematic audit on workforce innovation. 
• Workforce mapping and transition planning - ongoing organisation and
workforce mapping is supporting the shift to a hub-based community
delivery model over the next 3-5 years. An update was included in the
Leadership and Operating Model report to the Policy and Strategy
Committee in December 2025 (link). HR will continue to support Chief
Officers and managers through the transition, with strong
communication and engagement with employees and Trade Unions
remaining essential.
Shared services
and 
public service
reform
Explore opportunities for shared
services both within the council
and with partners, where
appropriate, to maximise
efficiency.
Feb-24 * Green At delivery and
ongoing
management
and monitoring
stage.
* Timescales and actions are determined by the Improvement Service. 
• Council representatives continue to take part in all Improvement Service
shared-services workstreams, including procurement, statutory and
discretionary services, digital transformation, potential national / regional
digital shared services, and active communities / participatory design. 
Page 61 of 454

Page 62

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
• Through these subgroups, the council inputs information and feedback
to help review and shape project activity across each workstream.
Shared services
and 
public service
reform
Maintain oversight of public
service reform developments
and ensure co-ordinated
response to external decision
making which has a bearing on
council service delivery.
Sept-23 * Green Crerar - at
delivery and
ongoing
management
and monitoring
stage. 
Democracy
matters -
complete.
* Timescales and actions are determined by the Improvement Service. 
1 out of the 2 projects / activities within this deliverable is now complete:
• Democracy Matters 2 - the council contributed to the development of
this consultation as part of the Local Governance Review. Following the
phase 2 findings, a national steering group was set up to take the work
forward (link).  The 2025 national programme for government provided a
brief update on proposed next steps (link). 
For the other project / activity, delivery is underway:
• Public sector reform - council representatives continue to support the
Improvement Service’s work on implementing Crerar for local
government. A national project has been launched to shape future
self-assessment and strengthen collaboration across scrutiny bodies
and local government, with a national framework due in 2026. To
support this, council officers attended workshops in the autumn of 2025.
Working with
other Boards
Work with other Boards to
support delivery of priorities
across the Programme of Work.
Jun-24 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
Delivery of the 3 projects / activities within this deliverable is underway:
• A model has been developed and successfully piloted to maintain
strategic oversight of Delivery Plan dependencies and
interdependencies, reducing risks of delay, friction, and duplication. It is
now being rolled out across the full Programme of Work.
• Quarterly monitoring reports identify hot spots affecting Programme of
Work delivery. These are reviewed by each Strategic Board and the
Corporate Management Team, triggering exception reports where
needed. To date, only two significant hot spots have required escalation
to the Corporate Management Team.
• Ongoing oversight ensures the Resources dimension is continuously
reviewed to support individual projects and cross-cutting Programme of
Work activity, maximising use of limited shared capacity. Quarterly
monitoring shows Resource impacts have reduced from 14% of the
Programme to 2.8%, with Time and Cost variations also steadily
declining. All six dimensions (scope, cost, quality, resources, risk, and
time) continue to be monitored by each Board, and by the One Service
Board as part of wider workforce planning.
Working with
other Boards
Ensure practical implementation
of Change Management
Framework.
Jun-24 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
A self-service Change Management Toolkit has been developed to evolve
as the Programme of Work progresses. It complements project
management by supporting the people side of change and strengthening
the council’s overall approach. Now complete, it has moved to the One
Service Board for organisation-wide deployment, with four related activities
Page 62 of 454

Page 63

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
underway to:
• Maintain strategic oversight of the council's significant change initiatives
to ensure successful delivery and implementation in line with the
Change Management toolkit.
• Maintain oversight of the identification and successful realisation of
benefits from such change initiatives.
• Maintain oversight of the change management requirements resulting
from public sector reform or identified shared services.
• Develop new ways of engagement both internally and externally to
support the changes and upskilling required.
Working with
other Boards
Lead engagement with staff,
trade unions, and partners about
the Programme of Work to
ensure understanding and
alignment.
Apr-24 Mar-28 Green At delivery and
ongoing
management
and monitoring
stage.
Work is underway to report on actions taken in response to staff feedback
from the 2024 roadshows. Across 72 events in 21 venues, over 2,200 staff
participated, with 81.9% agreeing the Programme of Work is on the right
track. Feedback - covering budgets and funding, staffing, education, health
and social care, and The Plan for North Lanarkshire - has been collated and
reviewed. A you said, we did programme is now being rolled out across the
organisation.
Leadership and 
operating model
and 
asset
rationalisation
Deliver the continued roll out of
the Leadership and Operating
Model to ensure an effective
community leadership approach,
working with partners, as the
hub approach develops.
Jun-22 Feb-33 Green At delivery and
ongoing
management
and monitoring
stage.
3 out of the 9 projects / activities within this deliverable is now complete:
• Kildonan Street - successfully relocated staff from Kildonan Street
offices to Buchanan Centre within 10 weeks to enable the Kildonan
Street re-development project.
• Broadwood Hub, Cumbernauld - phase 2 works delivered.
• Health and Social Care Partnership on GIRFE (Getting it Right for
Everyone) - partnership work is now complete and has transitioned to
business as usual, strengthening early access to support through new
community-hub ways of working. 
5 projects / activities are underway:
• Operationalising the new community hub model - this work has
accelerated following committee approvals in June 2024 (link),
December 2024 (link), June 2025 (link), and December 2025 (link),
supporting a more community-led approach. 
- Hub co-ordinators are developing operational models for statutory
and non-statutory services and strengthening third-sector
involvement. 
- Integrated support is now embedded in Newmains and St Brigid’s,
Riverbank, and Chryston, with delivery boards overseeing progress
and these hubs moving into business as usual from April 2026.  
- Orbiston is now operational with preparatory work underway as
Chryston High School extension, Gartcosh, St Kevins, and St
Stephen’s go live during 2026.
Page 63 of 454

Page 64

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
- Risk assessments, induction materials, reception guidance and
project documentation (including Equality Impact Assessments) are
maintained, with detailed plans available on request. 
- A performance framework has been adopted with early evidence
captured. 
• Calderhead Hub - phase 2 delivery is progressing following an options
appraisal process with the hub being relocated to meet requirements,
and the team transitioning into Assets and Procurement with a review of
future direction.
• Cumbernauld Hub - work to develop and implement the transition plan
for Cumbernauld Hub is ongoing, with space at Bron Way reconfigured
to meet operational needs. Design requirements will be revisited to
ensure redesign continues to meet service delivery needs.
• Early and inclusive family support - work to develop a proof-of-concept
model for early and inclusive family support through the community hub
model continues to scale up. 
- The service is now operating in all hubs, with increasing demand
leading to extended evening and weekend provision, including
drop-ins and piloted weekend activities. 
- Case studies are being gathered to support impact measurement,
needs assessments continue to shape forward plans, and
community events continue to inform future delivery. 
- Scaling across communities and reviewing the effectiveness of
extended hours remain key next steps.
• Phase 2 service delivery requirements - baseline work to define future
service delivery requirements is ongoing, supporting the 3-5-year
transition to the future operating model and informing capital
investment. Related activity on organisational review, service redesign,
workforce transition, and asset consolidation sits within the hub
operating model workstream. Service transformation continues, with
workforce plans submitted in September 2025 and a One Workforce
report in December 2025. Services will finalise requirements by June
2026 to support scenario planning and next steps. 
The remaining project / activity is not yet due to start:
• Work to expand the number of integrated hubs across the existing
estate - supporting the transition to the hub operating model and asset
rationalisation - has not yet begun as no capital funding has been
awarded. Subject to funding and the approved Strategic Asset Review
and Investment Strategy (SARIS), tests of change and updated options
appraisals will be taken forward. Activity is being progressed in line with
the SARIS reports approved by the Policy and Strategy Committee in Page 64 of 454

Page 65

Theme /
programme
Deliverables Start
date
End date Overall
deliverable
RAG
assessment
Overall
deliverable
completed
status
Position as at December 2025 (unless otherwise stated)
(including narrative where RAG status is Red or Amber)
September 2024 (link) and December 2025 (link).
Leadership and 
operating model
and 
asset
rationalisation
Align the asset rationalisation
strategy with the Leadership and
Operating Model to ensure
coherent phasing and maximise
efficiency.
Apr-23 Jul-28 Green At delivery and
ongoing
management
and monitoring
stage.
7 out of the 10 projects / activities within this deliverable are now complete:
• Technology - priorities have been identified using the digital framework,
with implementation now progressing through the Digital North
Lanarkshire Programme (e.g. public Wi-Fi, digital information screens,
room display panels to enhance the hub user experience, and a
corporate printing solution).
• Corporate telephony - implementation is underway, with basic functions
live, services migrating, and ongoing work with the supplier to enable a
single contact number and secure payment portal.
• Community asset profile - this has been reviewed across all nine
Community Board areas, informing best practice, next steps, and the
policy implementation plan overseen by the Community Asset
Leadership Group.
• A Community Ownership and Management of Assets Policy was
approved in June 2024 (link), widening the scope beyond Community
Asset Transfer to all community requests to use, manage, lease, or own
council assets. Community interest mapping is complete, and the capital
fund has been promoted.
• Discounted lease and let arrangements - a mechanism for this is in
place for community organisations that demonstrably contributes to the
council’s priorities.
• Co-design with communities - internal processes have been reviewed
and improved to support a shift toward co-design with communities as
part of the new Policy. 
• Communications - a refreshed communications approach includes new
hub web pages and a move to a cloud-based solution to improve
marketing of assets (linked to the corporate booking system), with a
proof-of-concept for hub model alignment. 
3 projects / activities are underway:
• Phase 2 service delivery requirements - baseline work to define future
requirements is ongoing, supporting the 3-5-year transition to the future
operating model and informing capital investment. 
• Activity on organisational review, service redesign, workforce transition,
and asset consolidation sits within the hub operating model workstream.
Service transformation continues, with workforce plans submitted in
September 2025 and a One Workforce report in December 2025. 
• Services will finalise requirements by June 2026 to support scenario
planning and next steps. 
Page 65 of 454

Page 66

Key stages for the project / activity in the Programme of Work Indicative % completed assessment
At initiation stage 
Project / activity still at proposal stage, and not yet approved by the relevant SRO / Chief Officer 
or approved to Project Brief (or equivalent) stage 
or approved to Project Brief (or equivalent) stage, but still in development / at feasibility stage.
>0% and <15%
At planning and 
set up stage
Project / activity approved to Project Business Case (or equivalent) stage
or Project or Delivery Plan developed. >=15% and <25%
At delivery and ongoing
management and
monitoring stage
Project / activity underway and delivery is categorised as: 
< =25% completed
or > 25% but < =50% completed
or > 50% but < =75% completed
or > 75% but < 100% completed.
>=25% and <95%
Completed or at
closure stage
Project / activity completed and closed off
or final evaluations, handovers, etc still to be undertaken. >=95% and =100% 
Key to RAG status for each deliverable
Blue Delivery is complete.
Green Delivery is on track and in line with the six dimensions within which the project / activity is being delivered (i.e. scope, cost / budget, quality, resources, risk,
within time / on schedule) and the % completed status is as expected as at the time of the delivery assessment.
Amber
Delivery is not on track and the latest assessment suggests there may be emerging issues with one or more of the six dimensions within which the project /
activity is being delivered (i.e. scope, cost / budget, quality, resources, risk, within time / on schedule) and/or the % completed status is not as expected as at
the time of the delivery assessment.
Red
Delivery is not on track and the latest assessment has reported issues with one or more of the six dimensions within which the project / activity is being
delivered (i.e. scope, cost / budget, quality, resources, risk, within time / on schedule) and/or the % completed status is behind that which is expected as at
the time of the delivery assessment.
Page 66 of 454

Page 67

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref DM/SL Date 19/03/26 
The latest North Lanarkshire context, challenges, and next steps 
From  Des Murray, Chief Executive  
E-mail murraydes@northlan.gov.uk 
Executive Summary
The Plan for North Lanarkshire is supported by a suite of high-level Health Check Indicators
that collectively provide the context for North Lanarkshire as a place. 
By providing a clear demographic, social, and economic profile of the area, this collective
set of indicators underpinned development of the long-term vision for The Plan for North
Lanarkshire when it was established in 2019. The indicators are designed to be interpreted
together, offering a comprehensive view of how different factors affecting the people and
communities of North Lanarkshire are connected. Taken as a whole, they continue to
provide a robust, consistent, and independent assessment of progress over time. 
Appendix 1 summarises the latest results for the 28 Health Check Indicators highlighting
encouraging progress across several important economic and social measures.  In the
2024-25 reporting periods, 50% of the indicators showed improvement over the period of
delivering The Plan for North Lanarkshire. This rose to 57% in the September 2025 update,
with the latest position now showing 68% (two thirds) improving over the lifetime of The
Plan. Key highlights include: 
• A significant increase in breastfeeding rates - after a flat trend in the previous year, the
latest results show that 35.6% of babies are being breastfed at the 6-8-week review -
up from the previous high of 30.4% and well above The Plan for North Lanarkshire
baseline of 23.1%.  This improvement supports healthier early development and helps
give more babies the best start in life.
• Gains in life expectancy - both male and female life expectancy in North Lanarkshire
shown a modest but encouraging rise, marking the first clear improvement since the
national decline seen during and following the pandemic.
• An increase in net migration - the latest rise in net migration (7.6%) signals increasing
confidence in the area, underlining its attractiveness as a place to live, work, and invest.
• Strong economic growth - North Lanarkshire continues to perform well, with sustained
year-on-year growth above national trends. This helps to attract further inward
investment, supports more job opportunities, and strengthens the area’s finance base,
expanding the resources available to improve services and quality of life for local people.
• Sustained annual growth in the average gross weekly pay - with average resident
earnings now reaching £775.10 per week. This is a 42% increase from The Plan for
North Lanarkshire baseline, outperforming both the national increase (38%) and the
increase across the group of comparable councils (36%) over the same period.
• More economic activity -  economic activity has improved for the last six consecutive
Item 4
Page 67 of 454

Page 68

quarters and now stands at 77.1%, close to both the pre-pandemic rate (77.2%) and
The Plan for North Lanarkshire baseline (77.9%).
• Less benefits claimants - the proportion of working age residents claiming employment
related benefits continues to fall, a trend first seen in 2020.  At 2.8% as at December
2025, it’s now at its lowest point in eight years and lower than the national average
(2.9%). This suggests more people are managing to stay in work or move into jobs,
helping to improve household budgets and contribute to greater stability in family life.
• Lower school exclusion rates -  both overall exclusion rates and those for looked-after
children continue to show significant improvement. The most recent results remain
below the national average and lower than comparator councils. This means more
children are staying connected to learning, facing fewer disruptions to their education,
and receiving support that helps them remain in school and make steady progress.
•  More recycling - North Lanarkshire’s waste recycling rates have reached an all-time
high (47.9%) and are now above the national average (44.3%). This means more
household waste is being reused rather than sent to landfill, helping to reduce
environmental impact, lower disposal costs, and support cleaner, greener, communities
for local residents.
• Less children living in poverty - after increases in the period following the pandemic, the
figures reported in September 2025 showed an improving picture nationally and locally.
In North Lanarkshire, the proportion of children living in poverty has fallen from 26.9%
to 24.9%, bringing the rate below The Plan for North Lanarkshire baseline of 25.2%. 
This means more families are experiencing improved financial stability, with fewer
children facing the pressures that come from low income.  However, despite this
progress, child poverty needs a continued focus to sustain and build on these
improvements. 
Appendix 1 provides a high-level summary of the latest results, including the associated
RAG status, while Appendix 2 offers detailed analysis for each of the 28 Health Check
Indicators and provides the broader context for North Lanarkshire. 
The suite of 28 Health Check Indicators also plays a vital role in evidencing transformation
across North Lanarkshire and in identifying priority areas for targeted strategic planning
through the Programme of Work. This approach continues to highlight economic, social,
and health trends that are unstable or persist despite sustained intervention, thus enabling
a more focused and informed policy response.  To this end Policy and Strategy Committee
will recall a report in March 2025 advising of a mid-term review of the Programme of Work
to ensure it remains current, relevant, and deliverable. 
This report provides an interim update on that review, framed by the latest Health Check
Indicator results, the challenges facing the wider local government environment, and the
implications for delivering North Lanarkshire’s priorities. Next steps over the spring of 2026
include a programme of engagement to further enhance Elected Member involvement in
the strategic planning process, ahead of a follow-up report to Policy and Strategy
Committee in June 2026. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Note the key role which the Health Check Indicators play in providing the evidence
base through which progress in delivering The Plan for North Lanarkshire can be
regularly assessed, 
(2) Take cognisance of the latest results set out in this report and the appendices,
including the successes and challenges noted in paragraphs 2.4 and 2.5,
Page 68 of 454

Page 69

1. Background 
1.1 Since The Plan for North Lanarkshire was established in 2019, it has been supported
by a suite of 28 Health Check Indicators from the Strategic Performance Framework
which aim to collectively provide the context for North Lanarkshire as a place.   
1.2 This suite of measures has been used constantly to provide a robust, consistent, and
independent evidence base to (a) demonstrate progress in delivering the Programme
of Work and achieving the vision of inclusive growth and prosperity for all as set out in
The Plan for North Lanarkshire, and (b) inform strategic planning and delivery priorities. 
1.3 In practice, these measures:
• Represent long-term outcomes that assess the overall state of a nation, i.e. North
Lanarkshire.  As outcome-focused planning takes time to show meaningful change
for people and communities, maintaining a consistent approach to measuring,
reviewing, and reporting progress ensures a sustained focus on the long-term
ambitions of The Plan for North Lanarkshire. This avoids over-reliance on
short-term measures that do not support long-term transformation.
• Provide a high-level impact assessment of the work of the council and its partners
on the area’s economy, people, and communities. It is recognised that long-term
investments, the time lag between investment and measurable impact, and the
need to consider how outcomes might have differed in the absence of council
activity must all be taken into account when interpreting the results.
• Comprise a small number of wider landscape measures that focus, where possible,
on outcomes rather than outputs. In doing so it is acknowledged that outcomes are
inherently challenging to measure and improvements in people’s lives are
influenced by many factors beyond the direct control of the council.
• Are sourced from externally produced statistics, ensuring that the data used is
objective and independently verified.
• Are available nationally, enabling comparison of North Lanarkshire’s performance
against other local authorities in the same comparative group and the national
average. 
1.4 This report continues the approach introduced in 2023 in terms of a standalone
assessment of the North Lanarkshire context.  It shows changes in performance from
the baseline established when The Plan for North Lanarkshire was approved and
provides deeper analysis of the data and trends underpinning the 28 Health Check
Indicators.  This supports reporting on progress, enhances understanding of the latest
context, and informs next steps delivery for the Programme of Work and its priorities. 
1.5 This year’s approach reflects improvements identified by Audit Scotland in their
thematic Best Value Transformation audit (reported to Policy and Strategy Committee
in September 2025) which recommended that “the council should ensure that the
(3) Note that more detail on the outcome and next steps following the review of the
Programme of Work will be presented to the Policy and Strategy Committee in June
2026, following a period of Elected Member and stakeholder engagement. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Page 69 of 454

Page 70

reporting of progress against its 28 Health Check Indicators is more accessible to the
public”.  The changes made in response are referenced in paragraph 2.2 and captured
in Appendix 2.  This information will also be used to update and enhance the relevant
content on the council’s website. 
1.6 Paragraphs 2.6 to 2.10 provide an update on the mid-term review of the Programme of
Work, set within the latest North Lanarkshire context and the wider local government
environment. The background to this review was first reported to the Policy and
Strategy Committee in March 2025. 
2. Latest results 
2.1 Appendix 1 presents the latest position for the 28 Health Check Indicators used to
monitor the impact of The Plan for North Lanarkshire.  Across each six monthly report
in 2024 and 2025, the results consistently showed that 50% of the indicators had
improved over the period of The Plan for North Lanarkshire.  The subsequent update
in September 2025 reported further progress, with the proportion of improving
indicators rising to 57%. The latest position, as set out in this report, shows further
change, with 68% (two thirds) of indicators now demonstrating positive movement over
the period of The Plan for North Lanarkshire. 
2.2  Previously, an appendix to this report set out detailed analysis of all 28 Health Check
Indicators, including trends and comparisons with national figures and similar councils.
While recognising the important role this plays in monitoring the impact of The Plan for
North Lanarkshire, Audit Scotland recommended that reporting on progress against the
28 Health Check Indicators should be more accessible to the public.  In response, the
deep dive in Appendix 2 adopts a less technical approach, presenting the information
in a clearer and more meaningful way with focused sections as noted below: 
• What this means - this section provides a brief description of what is being
measured, ensuring the indicator is clearly defined and can be consistently
understood. 
• Why this matters - this section explains why measuring this indicator is important,
particularly in demonstrating progress towards achieving inclusive growth and
prosperity for all as set out in The Plan for North Lanarkshire.
• Latest performance - this section includes a table showing baseline data for The
Plan for North Lanarkshire, supported by graphs with longer-term time series data
(where available). These visuals illustrate trends over time, as well as the position
before, during, and after the pandemic. Where national data sources recalibrate
their historical data at each publication, the Appendix reflects the most recent data. 
The table also provides Scotland-level figures and benchmarks showing the
comparative average for similar councils (where available and relevant).
• How North Lanarkshire has performed - this section provides narrative that
summarises the latest results, incorporating supplementary measures,
commentary, and analysis, to support interpretation within the North Lanarkshire
context.  This also reflects changes compared to the baseline position for The Plan
for North Lanarkshire which was established using the most up to date data
available at the time when it was approved and monitoring began. 
• Impact of delivering The Plan for North Lanarkshire - this section highlights how
changes in an indicator’s results over the lifetime of The Plan for North Lanarkshire
can be interpreted alongside delivery activity, offering insight into potential impact
and the wider economic, social, educational, and health trends shaping the lives
of the people and communities of North Lanarkshire. 
2.3 Despite some time lags in national data, the latest results for all indicators now fully
Page 70 of 454

Page 71

cover the post-pandemic period. This allows a clearer understanding of how the
pandemic affected progress in delivering The Plan for North Lanarkshire. In the main,
the impact is visible in the data from 2020 to 2022 when compared with results from
2019 and from 2022 onwards. 
2.4 The latest data for each of the 28 Health Check Indicators continues to show a number
of significant and positive trends that are encouraging.  The following represents a high-
level summary of key successes where new data has been available to provide an
updated position in this year’s report. 
• After little change in the previous year’s breastfeeding rates, the latest figures show
a marked increase with 35.6% of babies in North Lanarkshire being breastfed at
the 6-8 week review and getting the best start in life.  This is an improvement from
the previous high of 30.4% and The Plan for North Lanarkshire baseline of 23.1%.
• Life expectancy in North Lanarkshire for both males and females show a small
positive gain, the first significant change since a decline experienced nationally
over the period of the pandemic.
• The latest increase in net migration (7.6%) reflects a strong and growing
confidence in the area, highlighting its attractiveness as a place to live, work, and
invest. The latest population projections show the key role that inward migration
has in growing the local population.
• Gross weekly pay continues to show positive year-on-year growth, with the
average wage for North Lanarkshire residents now £775.10, compared with a
national average of £775.60. This represents a 42% increase (£229.40) from The
Plan for North Lanarkshire baseline, outperforming both the national increase of
38% (£212.90) and the 36% (£195.80) average rise across comparable councils.
Across the eight councils with the areas with the highest levels of deprivation,
average gross weekly pay is £745.50.
• Prior to the pandemic, North Lanarkshire had one of the strongest and
fastest-growing economies in Scotland, with consistent year-on-year expansion,
increasing numbers of businesses per head of population, and jobs safeguarded
through business support. Recent figures show the local economy continues to
grow, with a 12.5% increase on the previous year - above the national average of
9.1%.
• Prior to The Plan for North Lanarkshire baseline of 3.5% in December 2018,
employment-related benefit claims had remained relatively low, rising modestly to
3.7% by March 2020. The immediate impact of the pandemic saw this increase to
7.2% by August 2020, in line with national trends. Since then, rates have followed
a steady downward trajectory, with the figure as at December 2025 now at 2.8%
(around 6,170 people). This represents the lowest level ever recorded in North
Lanarkshire and is slightly below the latest national average of 2.9%.
• School exclusion rates continue to show significant improvement for both all pupils
and looked after children with the latest figures now below the national average
and the comparator figure for similar councils. Exclusion rates in North Lanarkshire
are now the sixth lowest in Scotland for looked after children.
• North Lanarkshire’s waste recycling rates have reached an all-time high for the
second year in a row (49.7%) and are now above the national average (44.3%). 
This is also reflected in the tonnage of waste recycled which also has reached an
all-time high of 72,401 tonnes (an increase of 6,000 tonnes over the period of The
Plan for North Lanarkshire). 
• Economic activity has now seen improvement for the last six quarters in a row and
at 77.1% is close to the pre-pandemic level (77.2%) and The Plan for North
Lanarkshire baseline (77.9%).
• Following the post-pandemic rise in child poverty rates across the country, the
figures reported in September 2025 show an improving national and local picture.
Page 71 of 454

Page 72

In North Lanarkshire, rates have fallen from 26.9% to 24.9%, now below The Plan
for North Lanarkshire baseline of 25.2%. 
2.5  Annual performance reports to the Policy and Strategy Committee have previously
highlighted the lasting social and economic impacts of the pandemic, particularly on
vulnerable people and communities. While some indicators still show residual effects,
there are now clear signs of improvement.  However, analysis of the data in Appendix
2 shows that these improvements are not consistent across all economic, social,
educational, and health aspects of North Lanarkshire. Some areas are benefiting more
than others, leaving the overall position fragile and vulnerable to wider economic or
environmental pressures. As a result, significant challenges remain. 
• As the proportion of the working-age population who are economically active has
increased, economic inactivity has fallen to 22.9%. Of those who are economically
inactive, around 78% (around 39,200 people) do not want a job - a decrease from
the previous high of 90.9% (around 50,600 people). However, long-term sickness 
- which has shown a small decrease - remains a significant challenge, accounting
for 43% of this group, while the remainder of those economically inactive refers to
students (21%), those looking after family or home (16%), and those who are
retired (10%). This means that 22.9% (around 11,200 people) are economically
inactive but would like a job.
• Three-year business survival rates in North Lanarkshire have shown some
variation, moving from 54.1% to 51.5% before rising to 53.4%, broadly in line with
national trends. Although the pandemic influenced earlier results, a strong base of
active businesses has been maintained throughout the lifetime of The Plan for
North Lanarkshire, reflecting ongoing resilience in a gradually recovering business
environment.
• National health and care experience survey results show some ongoing challenges
during The Plan for North Lanarkshire period. The proportion of adults supported
at home who feel able to live independently has moved from 75.4% to 67.7%, and
those reporting that their support improved or maintained their quality of life shifted
from 75.6% to 67.7%. The proportion of carers who feel supported has also
decreased from 33.2% to 28.5%.
• Life expectancy for both males and females has shown a small but welcome
increase for the first time since the pandemic. However, healthy life expectancy
(the number of years a person can expected to live in good/very good health) has
declined to 53.2 years for males and 52.5 for females. Although this follows the
national trend, the decline is more pronounced in North Lanarkshire.
• A deeper analysis of breastfeeding rates shows variation across review points. At
the first review (when babies are 10-14 days old), 53.3% of babies in North
Lanarkshire are being breastfed. Although rates remain positive at the 6-8-week
review (35.6%), they fall to 14.7% at the 13-15-month review point, indicating
ongoing challenges in sustaining breastfeeding over the longer term. 
Next steps 
2.6 Since 2019, the Programme of Work has provided a dynamic framework for delivering
The Plan for North Lanarkshire, stabilising strategic direction while allowing operational
flexibility. Ongoing commitment from the Policy and Strategy Committee has enabled
major achievements and helped drive transformation across North Lanarkshire. 
2.7 Progress in transforming North Lanarkshire through the Programme of Work was
highlighted by the Accounts Commission in the Best Value Controller of Audit report
(December 2025). The report also confirmed that the council maintains effective and
appropriate arrangements for financial management and sustainability, demonstrating
Page 72 of 454

Page 73

resilience and holding a stronger reserves position than many other councils. In
addition, an Internal Audit on financial sustainability, reported to the Audit and Scrutiny
Panel in March 2026, provided substantial assurance regarding the council’s robust
long-term financial planning. 
2.8 However, the Accounts Commission (February 2026) has identified growing financial
pressures across local government, with rising demand, increasing costs, and a
widening budget gap as funding is expected to fall in real terms to 2028/29. Despite
positive audit findings, the Commission (December 2025) recommended a strategic
shift to secure long-term sustainability. The council has responded by incorporating
these considerations into the mid-term review of the Programme of Work, first outlined
to the Policy and Strategy Committee in March 2025. 
2.9 The review identified a mix of immediate and long-term pressures that, while
challenging, create opportunities to reshape services and deliver lasting improvements.
This offers a solid basis to target the economic, social, health, and educational trends
most resistant to change, helping ensure sustained and wide-reaching progress. 
• Financial pressures and funding uncertainties - although local government faces
ongoing financial pressures from inflation, rising costs, and increasing demand,
these challenges emphasise the importance of targeted investment and service
innovation. This gives North Lanarkshire the opportunity to make clear decisions
about resource use, supporting long-term financial sustainability, and directing
investment where it will have the greatest impact.
• Policy pressures - while ring-fenced national funding restricts local flexibility, the
council can still reshape day-to-day service delivery. Strengthening the one-council
integrated approach, streamlining processes, and aligning supports locally will help
ensure services remain responsive to community needs within these policy
constraints.
• Rising demand for services is creating pressures across several areas:
-  Health and social care - an ageing population and more people living longer
with complex conditions are increasing demand for intensive care. This
reinforces the need to strengthen prevention, enhance community-based
support, and modernise care pathways so people receive timely, effective help
and can remain independent at home.
- Education and additional support needs - with more pupils requiring support
linked to neurodiversity, mental health, communication needs, and the impacts
of poverty, there is increasing scope to further develop inclusive practices,
expand early-help models, and enhance partnerships with families and
specialised services.
- Housing and homelessness - increasing numbers of households experiencing
financial hardship alongside long waiting lists for affordable housing highlights
growing pressures on the local housing system.  Reassessing current and future
needs will help ensure the right mix of housing and support to attract and retain
residents as well as sustain and grow the local tax base.
- Long-term population decline - reductions in the working-age population create
financial, social, workforce, and policy pressures. At the same time, uneven
demand across communities highlights opportunities to redesign services and
adopt more flexible, targeted approaches that use resources more effectively
and support long-term service sustainability.
• Workforce challenges - while recruiting and retaining staff, particularly for specialist
roles, remains difficult, these pressures also highlight the importance of developing
new approaches to workforce planning, skills development, and career pathways.
Developing more flexible and enabling workforce arrangements will be key to
building a more resilient and adaptable workforce capable of meeting future
Page 73 of 454

Page 74

demands.
• The position of central and local government - governance, funding, and
accountability arrangements are often shared or split across levels and not always
fully aligned. While this can create complexity, it also reinforces the value of
improving internal co-ordination, clarifying responsibilities, and streamlining
processes.  Strengthening these connections can support clearer decision-making,
reduce administrative burdens, and accelerate progress on shared priorities.
• Creating the capacity to shift focus - as national priorities broaden, the council has
the opportunity to balance essential day-to-day delivery with the transformation
needed to modernise systems and reduce routine, low-value activity. Better digital
connectivity and appropriate use of AI can streamline processes and free up staff
time. This will allow staff to focus more on supporting vulnerable individuals who
would benefit most from personalised, preventative support.
• Leading place-based regeneration - the council continues to lead place-based
regeneration and improve local communities while reshaping delivery models to
prioritise prevention and long-term outcomes. Enhanced digital infrastructure can
support more proactive responses and better collaboration across services.
Although day-to-day operational demands remain high, strengthening digital
capability and prevention-focused approaches will help shift resources towards
long-term improvement. 
2.10 Within the context set out in this report in relation to the latest results for the 28 Health
Check Indicators, and in relation to the wider local government context and pressures
set out in paragraph 2.9, the council is finalising the next steps following the mid-term
review of the Programme of Work. This will include a programme of Elected Member
and stakeholder engagement over the spring of 2026, ahead of a follow-up report to
Policy and Strategy Committee in June 2026. 
2.11 Latest results for each of the 28 Health Check Indicators will continue to be monitored
and reported to provide a consistent basis for assessing progress in short-term change
while maintaining a focus on long-term outcomes.  To support this, six-monthly interim
updates will continue to be included within Programme of Work reporting to the Policy
and Strategy Committee, alongside the annual report and cycle 1 deep dive each year. 
3. Measures of success 
3.1 Measures of success will be demonstrated through progress in delivering the
Programme of Work and in ensuring that the council’s portfolio of programmes,
projects, plans, and activities contributes positively to the North Lanarkshire context,
(as reflected in the 28 Health Check Indicators) and to the achievement of inclusive
growth and prosperity for all (as set out in The Plan for North Lanarkshire). 
4. Supporting documentation 
4.1 Appendix 1:  28 Health Check Indicators - summary of latest results and RAG 
status. 
Appendix 2: 28 Health Check Indicators - deep dive into the latest results and the   
North Lanarkshire context. 
Page 74 of 454

Page 75

Des Murray
Chief Executive
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
The legal impact in this report is only in relation to supporting demonstration of the
council’s compliance with the relevant legislation listed below.  It does not introduce
new legal duties or changes to the council’s statutory duty in this respect.
• The Local Government Act 1992 established the role of the Statutory Direction
to direct the “publication of information as to standards of performance”.  
• The Local Government in Scotland Act 2003 which introduced the duty of Best
Value; this requires that councils “make arrangements to secure continuous
improvement in performance”.   
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Page 75 of 454

Page 76

Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Ensuring an evidence based approach to strategic planning, performance
monitoring, and stakeholder reporting contributes towards mitigating the risks on
the Corporate Risk Register for the governance, leadership, and decision making
risk and the managing strategic change risk which was reframed to reflect the risk
in relation to delivery of the approved programme of work.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 76 of 454

Page 77

68%
improved over the
period of The Plan
for North
Lanarkshire
Gross weekly pay
£775.10
+ 42%
£545.70
Benefits claimants
2.8%
- 20%
3.5%
Growth in GVA per
head
£30,394
+ 43.4%
£21,198
Employment in
sustainable tourism
29%
+ 15.1%
25.2%
Pupils gaining 5+
awards at level 6
39%
+14.7%
34%
Pupils gaining 5+
awards at level 6
(SIMD)
25%
+ 25%
20%
Positive
destinations
93.9%
+ 2.3%
91.8%
School exclusion
rate, all pupils
9.7 per 1,000 pupils
- 72.4%
35.1
School exclusion
rate, looked after
26.7 per 1,000 
pupils
- 91.6%
317.9
Key to diagram
Indicator title
latest results
% change from baseline
The Plan for North
Lanarkshire baseline
figure
Household waste
recycled
47.9%
+ 16.5%
41.1%
Population
estimates
344,540
+1.2%
340,310
Est housing by
tenure
160,073
+ 4.1%
153,837
Net migration
7.6 per 1,000
population
+ 228%
2.3
GVA per head
sustainable tourism
£13,469
- 13.9%
£15,635
No formal
qualifications
12.8%
- 5.9%
13.6%
Supported at home
to live
independently
67.7%
- 10.2%
75.4%
Supported at home
to improve /
maintain quality of
life
67.7%
- 10.4%
75.6%
Carers supported
to continue in
caring role
28.5%
- 14.2%
33.2%
Economically active
77.1%
- 1%
77.9%
Neighbourhood
rating as place to
live (SIMD)
91.7%
+ 4%
88.2%
Neighbourhood
rating as a place to
live - all
91.9%
- 2.9%
94.6%
Life expectancy at
birth:
male / female
75.2 / 78.9
- 0.1% / - 0.6%
75.3 / 79.4
Children with no
concerns at 27-30
month review
81.8%
+ 1%
81%
Businesses 3-year
survival rate
53.4%
- 9%
58.7%
Change in
recorded crime
-0.6%
-118.2%
+3.3%
Population
projections
-0.1%
-200%
+ 0.1%
Breastfeeding
35.6%
+54.1%
23.1%
Children in poverty
24.9%
- 1.2%
25.2%
32%
not improved over
the period of The
Plan for North
Lanarkshire
as at March 2026
The Plan for North Lanarkshire - 28 health check indicators Appendix 1
Page 77 of 454

Page 78

Appendix 2
Strategic Performance Framework:
the North Lanarkshire context
Latest results
for the 28 Health Check Indicators
as at March 2026
Page 78 of 454

Page 79

Contents
c01: Population projections - % projected change in North Lanarkshire’s population in the
future
c02: Population - estimated number of residents in North Lanarkshire
c03: Net migration - rate per 1,000 population
c04: Housing - estimated housing by tenure
c05: Recycling - % household waste collected during the year that is recycled
c06: Crime - % change from the previous year in the number of crimes recorded
c07: Rating of neighbourhood as a place to live (all neighbourhoods) - % good / very good
ratings
c08: Rating of neighbourhood as a place to live (20% most deprived neighbourhoods, as
defined by the SIMD) - % good / very good ratings
c09: Breastfeeding - % of babies breastfed at 6-8 week review
c10: Child wellbeing - % of children reviewed at 27 to 30 months with no concerns recorded
c11: Educational attainment - % of pupils achieving 5 or more awards at level 6
c12: Educational attainment - % of pupils living in 20% most deprived areas (as defined by
the SIMD) achieving 5 or more awards at level 6
c13: Post school destinations - % of pupils entering positive post school destinations
c14: School exclusion rate per 1,000 pupils - all children
c15: School exclusion rate per 1,000 pupils - looked after children
c16: Gross Value Added (GVA) - economic growth per head of population
c17: Average gross weekly pay - for North Lanarkshire’s residents
c18: Economically active - % of the working age population who are economically active
c19: Businesses - % of the VAT / PAYE registered businesses that survive for at least three
years
c20: Benefits - % of the working age population claiming one or more of the key
employment related benefits
c21: Qualifications - % of the working age population that have no formal qualifications
c22: Poverty - % of children living in poverty after housing costs
c23: Life expectancy at birth - estimates
c24: Rating of health and care experience - % of adults supported at home who agreed that
they are supported to live as independently as possible
c25: Rating of health and care experience - % of adults supported at home who agree their
services and support had an impact on improving or maintaining their quality of life
c26: Rating of health and care experience - % of carers who feel supported to continue in
their caring role
c27: Employment in sustainable tourism - as a % of employment across all six of the
growth sectors
c28: Gross Value Added (GVA) - growth per head in sustainable tourism employmentPage 79 of 454

Page 80

Population projections - % projected change in North Lanarkshire’s
population in the future (c01) 
What this means
• This measures the projected future size, age structure, and gender composition of the
population for an area.
• Population projections are based on the estimated population with past trends of fertility,
mortality, and migration analysed to project future births, deaths, migration, and population. 
• Population projections are intended to provide information on possible changes in population
size and structure for future years with calculations based on population estimates as at a
point in time. Annual mid-year population estimates published by the National Records of
Scotland should continue to be used to provide the most up to date / latest population count
and structure as at the point it is published each year.
• The most recent population projections at a local authority level were released by the National
Records of Scotland in September 2025.  These are 2022 based population projections which
have been rebased to reflect the 2022 Census data. 
Why this matters
• Measuring population projections is important because it provides an evidence-based
understanding of how population size and structure may change over time. These
scenario-based models help organisations anticipate future service needs by highlighting
trends in births, deaths, migration, and shifts in age distribution. 
• This insight supports long-term planning by identifying emerging pressures and ensuring that
policies, investments, and strategies remain aligned with expected demographic change. 
Latest performance 
Table 1: Projected number of people - by gender - and % change from 2022 to 2027, 2032, and 2047 
population
baseline projected number of people
change
2022-27 2022-32 2022-47
2022 2027 2032 2047 number % number % number %
all
persons 340,920 342,297 342,387 349,419 +1,377 0.40% +1,447 0.42% -501 -0.15%
females 175,186 175,932 176,137 175,072 +746 0.43% +951 0.54% -114 -0.07%
males 165,734 166,365 166,230 165,347 +631 0.38% +496 0.30% -387 -0.23% 
Table 2: Projected number of people - and % change from 2027 to 2032 and from 2032 to 2047 
change
2027-32 2032-47
number % number %
all persons +70 0.02% -1,948 -0.57%
females +205 0.12% -1,065 -0.60%
males -135 -0.08% -883 -0.53% 
The National Records of Scotland (NRS) have produced a summary of the 2022 based population projections
(published in September 2025).  This includes: 
• Comparisons across all 32 local authorities in Scotland:
https://www.nrscotland.gov.uk/publications/subnational-population-projections-2022-based/ 
• A profile for each local authority: https://www.nrscotland.gov.uk/statistics-and-data/council-area-profiles/north-
lanarkshire/ 
Page 80 of 454

Page 81

Table 3: Projected number of people - by age group - and % change from 2022 to 2027, 2032, and 2047 
population
baseline projected number of people
change
2022-27 2022-32 2022-47
2022 2027 2032 2047 number % number % number %
Age group
Children (0-
15) 60,081 56,116 53,107 51,957 -3,965 -6.6% -6,974 -11.6% -8,124 -13.5%
Pre-school
(0-4) 16,729 15,746 15,811 15,691 -983 -5.9% -918 -5.5% -1,038 -6.2%
Primary
school (5-11) 26,782 24,563 22,841 23,014 -2,219 -8.3% -3,941 -14.7% -3,768 -14.1%
Secondary
school (12-
15)
16,570 15,789 14,455 13,252 -781 -4.7% -2,115 -12.8% -3,318 -20.0%
Working age
(16-64) 219,473 218,979 214,252 207,336 -494 -0.2% -5,221 -2.4% -12,137 -5.5%
16-17 7,715 8,295 7,623 6,594 580 7.5% -92 -1.2% -1,121 -14.5%
18-29 47,879 48,320 47,859 40,204 441 0.9% -20 0.0% -7,675 -16.0%
30-44 66,326 66,828 68,158 67,996 502 0.8% 1,832 2.8% 1,670 2.5%
45-64 97,553 95,536 90,612 92,542 -2,017 -2.1% -6,941 -7.1% -5,011 -5.1%
Pensionable
(65+) 61,366 67,202 75,008 81,126 5,836 9.5% 13,642 22.2% 19,760 32.2%
65-74 35,073 38,352 43,044 36,918 3,279 9.3% 7,971 22.7% 1,845 5.3%
75-84 20,201 22,530 24,627 32,933 2,329 11.5% 4,426 21.9 % 12,732 63.0%
85+ 6,092 6,320 7,337 11,275 228 3.7% 1,245 20.4% 5,183 85.1%
Total 340,920 342,297 342,367 340,419 1,377 0.4% 1,447 0.4% -501 -0.1% 
Table 4: Projected number of people - by age group - and % change from 2027 to 2032 and from 2032 to 2047 
change Page 81 of 454

Page 82

2027-32 2032-47
number % number %
Age group
Children (0-15) -3,009 -5.4% -1,150 -2.2%
Pre-school (0-4) 47 0.3% -120 -0.8%
Primary school (5-11) -1,722 -7.0% 173 0.8%
Secondary school (12-15) -1,334 -8.4% -1,203 -8.3%
Working age (16-64) -4,727 -2.2% -6,916 -3.2%
16-17 -672 -8.1% -1,029 -13.5%
18-29 -461 -1.0% -7,655 -16.0%
30-44 1,330 2.0% -162 -0.2%
45-64 -4,924 -5.2% 1,930 2.1%
Pensionable (65+) 7,806 11.6% 6,118 8.2%
65-74 4,692 12.2% -6,126 -14.2%
75-84 2,097 9.3% 8,306 33.7%
85+ 1,017 16.1% 3,938 53.7%
Total 70 0.0% -1,948 -0.6% 
How North Lanarkshire has performed
North Lanarkshire’s population is projected to decrease by an estimated 501 people in the 25
year projection period from 2022 to 2047.  However, change over this time varies across the
intervening years as can be seen from Figure 01a and Tables 1 and 2. 
Overall population
• The population is expected to grow by an estimated +1,377 people from 2022 to 2027 and by
an estimated +1,447 people from 2022 to 2032.
Page 82 of 454

Page 83

• This growth is expected to hit a peak of 342,404 in 2035, an estimated increase of +1,484
people from 2022 to 2035.
• From 2035 population projections show a year on year decline which signify an estimated
reduction of -1,985 people overall from 2035 to 2047.
• This culminates in gradual population growth of +0.44% from 2022 to 2035, followed by a
small -0.58% population decline in North Lanarkshire from 2035 to 2047.  It should be noted
though that the reliability of projections decreases over time so the change from 2035 to 2047
is a more general indication of the future population. 
Age structure
• Figure 01b and Tables 3 and 4 show the projected change over time in relation to the age
structure of this population.  This shows a declining population age 0 to 15 and also a
declining population of working age, with the population age 65+ continuing to grow.
• Figure 01c shows that the projected number of births is expected to decline over the years,
with a corresponding increase in the number of deaths. As shown in Figure 01d, this means
that the net change in the population will decrease over time.
• Any population gains are therefore expected to come from an increase in net migration over
the years. 
Impact of delivering The Plan for North Lanarkshire
Population projections help organisations understand the scale and pace of population growth,
allowing them to better anticipate rising demand for services and infrastructure. More accurate
projections reveal where growth will place the greatest pressure on housing, healthcare,
education, transport, and the labour market, enabling earlier and more targeted investment. 
By clarifying which areas are expanding fastest, projections ensure resources are allocated fairly
and strategically, helping to prevent service pressures or shortages as demand increases. This
supports better decision-making and enables sustainable, inclusive growth as areas plan ahead
to accommodate a larger and more diverse population. 
Page 83 of 454

Page 84

Population - estimated number of residents in North Lanarkshire
(c02) 
What this means
• This measure shows the population of North Lanarkshire as at a defined point in time.
• It is an estimate count as at 30th June each year of residents in an area.  It captures the main
components of population change from year to year in respect of births, deaths, and net
migration as well as changes in the armed forces and prison population.
• Following the publication of the 2022 Census results, and a national review of international
and internal migration for Scotland, local authority and national population estimates were re-
based from 2011 onwards to ensure a more accurate and up to date position moving forward.   
Why this matters
• Measuring the population on an ongoing basis is important as it provides the evidence needed
to understand changing demographic needs and plan services effectively. By grounding
decisions in reliable and consistent data on how many people live in an area and what their
characteristics are, population estimates help identify where demand is growing, and where
targeted support is required. 
Latest performance 
Performance indicator 2017 2018 2019 2020 2021 2022 2023 2024
Estimated mid-year
population - North
Lanarkshire
340,310 340,350 341,570 341,400 341,280 340,920 342,780 344,540
Estimated mid-year
population - Scotland 5.39m 5.39m 5.41m 5.41m 5.41m 5.45m 5.51m 5.55m 
The National Records of Scotland (NRS) have produced a summary of the findings from the 2024 mid-year
estimates.  This includes: 
• Comparisons across all 32 local authorities in Scotland: https://www.nrscotland.gov.uk/publications/mid-2024-
population-estimates/#   
• A profile for each local authority: https://www.nrscotland.gov.uk/statistics-and-data/council-area-profiles/north-
lanarkshire/ 
Page 84 of 454

Page 85

How North Lanarkshire has performed
North Lanarkshire has the 4th highest population in 2024, out of all 32 council areas in Scotland.
The latest estimated population of North Lanarkshire as at June 2024 is 344,540 (Figure 02a). 
This continues an increasing trend from the previous year.   
• The latest estimates for the population of North Lanarkshire (344,540) are an increase of
0.51% from 342,780 in 2023. Over the same period, the population of Scotland increased by
0.74% (Figure 02b).
• Between 2001 and 2024, the population of North Lanarkshire has increased by 7.3%. This is
the 19th highest percentage change out of the 32 local authority areas in Scotland. Over the
same period, Scotland’s population rose by 9.5%.
• Over the period of The Plan for North Lanarkshire the population has increased by 1.2%,
compared to growth of 3% nationally. 
• In 2024, there were more females (51.3%) than males (48.7%) living in North Lanarkshire.
There were also more females (51.4%) than males (48.6%) living in Scotland overall. 
The increasing trend in North Lanarkshire’s population from 2023 to 2024 mirrors the increase in
the national average and 26 other local authority areas in Scotland.  Only five local authority
areas (i.e. Argyll and Bute, Angus, Dundee City, Western Isles, and Dumfries and Galloway) saw
a population decrease over the same period. 
Impact of delivering The Plan for North Lanarkshire
An increasing population can support growth by expanding the workforce, boosting economic
activity, and increasing demand for goods and services, which can stimulate investment and
create jobs. 
It also contributes to long-term prosperity by helping maintain a balanced demographic profile,
ensuring there are enough working-aged people to sustain public services and support an ageing
population. When well planned for, population growth enables services, infrastructure, and
opportunities to develop in ways that benefit all communities.
Page 85 of 454

Page 86

Net migration - rate per 1,000 population (c03) 
What this means
• This measures the number of people coming into North Lanarkshire minus the number of
people leaving.
• Figures are published by the National Records of Scotland and relate to total net migration, i.e.
the difference between immigration (people moving into a country or area to live, work, or
study) and emigration (people moving out of a country or area to live somewhere else).  This
includes asylum seekers, refugees, and rounding adjustments. 
• Following the publication of the 2022 Census results, and a national review of international
and internal migration for Scotland, local authority and national population estimates were re-
based from 2011 onwards to ensure a more accurate and up to date position moving forward.   
Why this matters
• Measuring net migration shows whether an area is attracting people for opportunities or losing
them due to limited prospects. Positive net migration suggests people see opportunities in an
area - such as jobs, safety, and quality of life - while negative net migration can highlight
underlying challenges. 
• Monitoring migration trends also help identify key labour-market gaps. The statistics also
highlight demand for housing, schools, health and social care, and transport. Understanding
these patterns strengthens community cohesion by supporting effective integration and
enabling proactive planning for services and support. 
Latest performance 
Performance indicator 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/232 2023/24
Net migration rate per
1,000 population - North
Lanarkshire
2.3 1.5 3.9 1.8 2.5 2.1 8.2 7.6
Net migration rate per
1,000 population - Scotland 4.2 3.0 5.2 3.0 4.1 10.1 14.1 10.2
Comparative average for
the group of similar
councils*
2.6 0.8 2.9 0.4 2.6 7.7 12.2 8.2 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
Page 86 of 454

Page 87

How North Lanarkshire has performed
Net migration in North Lanarkshire has generally been positive in recent years, with more people
moving into the area than moving out.  This can be seen in Figure 03b in terms of the number of
people migrating into the area. 
•  Recent figures show a positive change with an increase of +8.2 per 1,000 population in 2023-
24 and +7.6 in 2023-24, which although a small decrease from the previous year it still shows
significant growth in North Lanarkshire’s population in the year.
• Over the period of The Plan for North Lanarkshire migration growth now sits at +7.6 per 1,000
population compared to the baseline of +2.3, an estimated increase over the period of around
10,000 people (Figure 03b). 
Figure 03a shows that historically the trend in North Lanarkshire has mirrored that of the national
position (which currently sits at 10.2 per 1,000 population) - and also the comparative average for
the group of similar councils (which currently sits at 8.2 per population) - albeit migration in North
Lanarkshire has remained at a slightly lower growth rate than the national position.   
The National Records of Scotland (NRS) report that net migration was positive in all of Scotland’s
32 local authority areas over the latest year, with migration into Scotland - both international and
from the rest of the UK - being heavily concentrated in urban areas, particularly Glasgow and
Edinburgh. 
Impact of delivering The Plan for North Lanarkshire
Improving net migration rates means more people, skills, and spending power are coming into an
area. A growing population supports local businesses, fills labour shortages, and boosts
productivity, while also increasing demand for housing, schools, transport and services -
stimulating further job creation. 
Improving net migration helps stabilise areas experiencing demographic decline, protecting the
sustainability of schools, health services, and local businesses.  Attracting people of working age
expands the tax base, enabling greater investment in infrastructure and community programmes.
Page 87 of 454

Page 88

Housing - estimated housing by tenure (c04) 
What this means
• This measures the estimated number of dwellings in North Lanarkshire by tenure (i.e. owner
occupied, private rented, vacant or second home, housing association, and local authority). 
• Data is updated each year using information from Housing Statistics Annual Returns, stock
figures from the Scottish Housing Regulator and National Records of Scotland dwelling
counts, and the Scottish Household Survey.
• Estimates for owner occupier and rented privately categories for 2020 are not directly
comparable to previous years, due to the change in the methodology of the Scottish
Household Survey in 2020 due to the pandemic. 
Why this matters
• Measuring tenure patterns highlight where housing is affordable and secure - and where it is
not - helping identify areas facing limited housing options so that investment and regeneration
can be targeted where they will have the greatest impact.  
• It also shows whether people have genuine choice in the types of homes available to them,
ensuring that different needs, life stages, and incomes can be supported. 
Latest performance 
Performance indicator 2017 2018 2019 2020 2021 2022 2023
estimated number of
dwellings - North
Lanarkshire
153,837 154,825 156,028 157,355 158,041 159,021 160,073
housing tenure - %
owner occupied 56.6 59.6 59.9 59.4 57.9 61.7 60.0
housing tenure - % local
authority 23.7 23.5 23.4 23.4 23.3 23.2 22.9
housing tenure - %
privately rented 12.1 9.4 8.9 8.8 11.0 7.1 8.7
housing tenure - %
housing associations 6.1 6.1 6.1 6.7 6.1 6.3 6.5
housing tenure - %
vacant or second homes 1.4 1.4 1.7 1.8 1.7 1.7 2.0 
How North Lanarkshire has performed 
Estimated number of dwellings Page 88 of 454

Page 89

• In terms of overall dwellings, there were an estimated 160,073 households in North
Lanarkshire in 2023 - which is an increase of 4.1% over the period of The Plan for North
Lanarkshire, compared to a 4.8% increase in Scotland overall. 
Housing tenure
• Figures 04a shows dwellings in North Lanarkshire by tenure, with the largest proportion being
owner occupied which has seen a 10.2% increase over the period of The Plan for North
Lanarkshire (compared to an 8.2% increase in this tenure in Scotland overall).
• Other significant changes of note in tenure in North Lanarkshire over the period of The Plan
for North Lanarkshire are in housing association tenure (an increase of 10.6%), and private
rented (a decrease of 25%) compared to an 8.9% increase in housing association tenure and
8.9% decrease in private rented in Scotland overall 
There is a time lag in this data at a local authority level, with the 2023 update published in May
2025 being the most up to date position available. 
Impact of delivering The Plan for North Lanarkshire
Improving housing tenures increases affordability, security, quality, and choice, helping to create
more stable, resilient, and prosperous communities. A better tenure balance reduces pressures
associated with insecure or unaffordable housing, leading to improved health and wellbeing,
stronger educational outcomes, and greater household stability. It also broadens the range of
homes available, giving people real choice that matches their needs, life stage, and income. 
At a community level, a healthier mix of housing options reduces concentrations of deprivation
and strengthens community cohesion. Economically, improved housing tenures support access to
employment, increased disposable income (by reducing housing cost burdens), and helps attract
investment into places that are seen as stable and vibrant. 
Page 89 of 454

Page 90

Recycling - % household waste collected during the year that is
recycled (c05) 
What this means
• This measures the proportion of household waste collected each year that is recycled.
• Recycling figures are calculated according to Scotland’s national recycling rate methodology. 
Over the years there have been changes to the methodology in terms of what is counted as
recycled, although these have been relatively minor and are not considered to have any
significant bearing on the reported figures.
• Data is submitted by all 32 Scottish local authorities to Scottish Environment Protection
Agency (SEPA) using a web-based reporting tool. While the data presented here is the most
up to date available as at the time of producing this report; figures are subject to change
following SEPAs annual verification process. 
Why this matters
• Measuring recycling can help to support a cleaner, stronger local economy. 
• Measuring recycling rates can help inform reductions in waste going to landfill, cut disposal
costs, and free up resources that can be reinvested in local services.   
Latest performance 
Performance
indicator 2016 2017 2018 2019 2020 2021 2022 2023 2024
Recycling - % of
household waste
collected that is
recycled - North
Lanarkshire
41.1 39.6 43.7 40.3 39.4 43.4 43.0 46.7 47.9
Recycling - % of
household waste
collected that is
recycled - Scotland
45.1 45.6 44.7 44.9 42.1 43.0 43.3 43.5 44.3
Comparative
average for the
group of similar
councils*
41.5 42.3 42.4 43.1 40.7 39.9 40.5 40.4 42.3 
* Based on the eight councils that are the most densely populated areas in Scotland (based on the number of people per square
mile, i.e. Aberdeen City, City of Edinburgh, Dundee City, Glasgow City, Falkirk, East Dunbartonshire, West Dunbartonshire, and
North Lanarkshire). 
Page 90 of 454

Page 91

How North Lanarkshire has performed
Latest results show that recycling rates in North Lanarkshire are now the highest over the
recorded data with 47.9% of household waste collected during the year being recycled.   
• The latest results in Figure 05a (47.9%) show an increase on the previous year (46.7%).
• Over the period of The Plan for North Lanarkshire recycling rates have increased from 41.1%
to 47.9%.  
• This improvement is also reflected in Figure 05b and an almost 10% increase in the tonnage
of waste recycled over the same period (from 66,207 to 72,401).  This is over 6,000 tonnes
which, for illustrative purposes, roughly equates to the same weight as 4,000 cars. 
The latest results for North Lanarkshire show a positive improving position that mirrors the trend
in both the national average and the comparative average for the group of similar councils. 
Figure 05a shows that North Lanarkshire has now moved to performing better than the latest
national average (44.3%) and the comparative average for the group of similar councils (42.3%). 
Impact of delivering The Plan for North Lanarkshire
Recycling helps local communities look cleaner, tidier, and better cared for by reducing litter,
overflowing bins, and fly-tipping.  It helps to protect local environments, and build local pride and
trust. People can see how their actions are helping their area improve and understand that
progress is being shared across neighbourhoods.  It also creates healthier places to live, making
neighbourhoods more attractive for residents, visitors, and businesses. 
Improving recycling rates can support local jobs and businesses linked to waste management,
recycling, repair, reuse, and the circular economy, helping money stay within the local economy
and supporting the people who live there. 
Page 91 of 454

Page 92

Crime - % change from the previous year in the number of crimes
recorded (c06) 
What this means
• This measures the percentage change in the number of crimes recorded from one year to the
next.
• This includes all crime recorded in six categories - damage and reckless behaviour, crimes of
dishonesty, crimes against society, sexual crimes, non-sexual crimes of violence, and
coronavirus restrictions. 
• Statistics on recorded crimes provide a measure of volume of criminal activity which the police
face. This does not reveal the incidence of all crime committed as not all crimes are reported
to the police.   
Why this matters
• Measuring changes in recorded crime matters because crime directly affects people’s ability to
work, learn, run businesses, and feel safe in their neighbourhoods. Understanding these
trends helps support vulnerable groups, target regeneration, and invest in preventative
approaches that make places safer. 
• Monitoring crime rates also show which local interventions are driving real change. Whether
it’s youth services, CCTV, improved lighting, or community safety partnerships, trends in
recorded crime help identify what works and where investment has the greatest impact in
communities. 
Latest performance 
Performance indicator 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25
% change in the number of
crimes recorded from
previous year - North
Lanarkshire
3.3 5.8 3.6 -2.9 -14.2 0.6 4.0 -0.6
% change in the number of
crimes recorded from
previous year - Scotland
2.0 0.5 -0.2 -1.9 -4.3 1.0 3.6 -0.2
Comparative average for
the group of similar
councils*
0.1 2.2 1.0 -0.2 -9.0 1.9 3.1 0.1 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
Page 92 of 454

Page 93

How North Lanarkshire has performed
Latest results show a decrease in recorded crime in North Lanarkshire (-0.6%) from the previous
year. 
• The latest results (Figure 06a) show a decrease in the number of crimes recorded in North
Lanarkshire from 2023/24 to 2024/25 of -0.6% (from 19,504 to 19,384).  
• This is an improvement from the position reported last year where there had been an increase
of 4% recorded (from 18,751 to 19,504).
• The latest results (-0.6%) show improvement from The Plan for North Lanarkshire the baseline
(+3.3%) in terms of the change in recorded crime from the previous year.  
• Since The Plan for North Lanarkshire baseline recorded crime has dropped 5% overall from
7 212
7 716
8 089
5 839
5 315
5 790
6 596
6 097
4 546
5 076
5 457
6 058
4 887
4 751
4 657
4 950
3 888
3 892
3 610
3 323
3 310
3 188
2 956
2 781
4 119
4 286
4 469
4 202
4 050
4 056
4 357
4 617
660
638
752
827
909
966
938
939
2017-18
2018-19
2019-20
2020-21
2021-22
2022-23
2023-24
2024-25
igure 06c number of crimes in NL by category
Sexual crimes Non-sexual crimes of violence Damage and reckless behaviour Crimes against society Crimes of dishonesty
Page 93 of 454

Page 94

20,425 to 19,384 (Figure 06b), compared to a drop of 1.7% nationally and 1.4% for the group
of similar councils.
• Figure 6c provides a breakdown of the crimes recorded by category with crimes of dishonesty
remaining at the highest level albeit showing reductions over the years.  As there is only data
for 2020 to 2022 for coronavirus restrictions, Figure 6c doesn’t show this category. 
The trend in recorded crime in North Lanarkshire is mirrored in the comparison with the national
average, although numbers have decreased to a greater extent in North Lanarkshire over the
period.  The position in North Lanarkshire is also better than the comparative average for the
group of similar councils which conversely experienced an increase of 0.1% from last year’s
figures.   
The pandemic, and associated measures to limit social contact, had an impact on both the type
and volume of crime recorded between March 2020 and the lifting of final legal restrictions in April
2022. 
Impact of delivering The Plan for North Lanarkshire
When recorded crime decreases, communities feel safer and more confident visiting and using
local spaces. This increased footfall supports small businesses and makes neighbourhoods more
vibrant. Safer places become more attractive to live in, work in, and invest in - encouraging
employers, developers, and new enterprises to choose the area. Lower crime helps sustain
stable jobs, creates new economic opportunities, and builds a stronger sense of pride and
belonging across all communities. 
Falling crime reduces pressure on public services, boosts community wellbeing, and increases
the attractiveness of local areas for inward investment and jobs. 
Page 94 of 454

Page 95

Rating of neighbourhood as a place to live (c07 and c08) 
What this means
• This measures how people who have responded to the national Scottish Household Survey
rate their neighbourhood as a place to live.  The survey responses include the following two
measures:
- Very good or fairly rating of neighbourhood as a place to live by all respondents.
- Very good or fairly rating of neighbourhood as a place to live by respondents living in the
most 20% deprived areas (as per the Scottish Index of Multiple Deprivation (SIMD)).
• The Scottish Household Survey is an annual survey of adults living in households in Scotland,
carried out since 1999. It aims to collect reliable and up-to-date information on a range of
topics, through a random sample of around 10,000 people across Scotland. It is a voluntary
and interviewer-led survey, usually carried out face-to-face in people’s homes 
Why this matters
• Measuring how residents feel about their neighbourhood shows how people experience where
they live and the surrounding environment. This offers valuable insight into the overall
wellbeing, cohesion, and resilience of a community. 
• People’s perceptions are often one of the strongest indicators of whether a place is functioning
well. How residents rate their neighbourhood captures key aspects of daily life, including
safety, cleanliness, access to services, social connections, and overall satisfaction.
• Comparing satisfaction between areas, for example, all respondents in North Lanarkshire
compared to those living in the most 20% deprived areas helps identify where differences in
the local environment exist and where improvements are working. 
Latest performance 
% of respondents who rated their neighbourhood very good or fairly good as a place to live - all respondents 
Performance indicator 2017 2018 2019 2022 2023 2024
% of respondents who rated their
neighbourhood very good or fairly good
as a place to live by all respondents -
North Lanarkshire
94.6 90.3 91.8 94.2 92.7 91.9
% of respondents who rated their
neighbourhood very good or fairly good
as a place to live by all respondents -
Scotland
95.0 94.6 94.2 94.9 94.7 93.9
Comparative average for the group of
similar councils* 93.4 92.2 92.3 93.8 92.9 91.8 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
Page 95 of 454

Page 96

% of respondents who rated their neighbourhood very good or fairly good as a place to live - respondents living in
the 20% most deprived areas (as per the Scottish Index of Multiple Deprivation(SIMD)) 
Performance indicator 2017 2018 2019 2022 2023 2024
% of respondents who rated their
neighbourhood very good or fairly good
as a place to live by respondents living
in the 20% most deprived areas - North
Lanarkshire
88.2 82.3 88.7 90.1 88.2 91.7
% of respondents who rated their
neighbourhood very good or fairly good
as a place to live by respondents living
in the 20% most deprived areas -
Scotland
86.6 85.4 84.8 85.9 87.7 84.2
Comparative average for the group of
similar councils* 87.5 84.0 83.7 87.7 87.4 84.8 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
How North Lanarkshire has performed
The Scottish Household Survey obtains its data from a small sample of the population - around
10,000 people across Scotland responded to the survey in 2024.  An approximate 5% sample of
responses were from residents living in North Lanarkshire. 
The latest results show that from the sample surveyed 91.9% of residents rate North Lanarkshire
as a very good / fairly good place to live.  The response from those living in the 20% most
deprived areas shows a similar rating of 91.7%. 
% of respondents who rated their neighbourhood very good or fairly good as a place to live - all respondents
• Residents’ perceptions of their neighbourhood in North Lanarkshire shows some fluctuation
over the recorded data (Figure 07a). 
• While the latest results for North Lanarkshire show a slight decline from the previous year -
from 92.7% to 91.9% - this decreasing trend is also reflected in the national average and the
comparative average for the group of similar councils.
• This indicator shows a decline immediately following the baseline of The Plan for North
Lanarkshire, and while this has increased since, the latest results (91.9%) remain below the
baseline (94.6%). 
% of respondents who rated their neighbourhood very good or fairly good as a place to live - respondents living in
the 20% most deprived areas (as per the Scottish Index of Multiple Deprivation(SIMD))
• A small increase (from 88.2% who rated their neighbourhood as very good or fairly good to
91.7%) can be noted in ratings over the recorded data for neighbourhood as a place to live in
the 20% most deprived areas (Figure 08a) compared to all neighbourhoods which
experienced a slight decline (from 92.7% to 91.9%) over the same period.  Page 96 of 454

Page 97

• Conversely the national picture shows a decrease from 87.7% to 84.2% over the same period. 
Over the recorded data, figures for the national average shows ratings generally to be the
same or at a lower level than North Lanarkshire.
• This indicator showed a decline immediately following the baseline of The Plan for North
Lanarkshire but has now increased, with the latest results (91.7%) higher than the baseline
(88.2%). 
The latest North Lanarkshire results show an improving picture in respect of the response from
those living in the 20% most deprived areas (Figure 08a), while for all areas there remains little
change (Figure 07a). 
Figure 08a shows that North Lanarkshire (91.7%) continues to perform better than the
comparative average for the group of similar councils (84.8%). 
The methodology used for surveys undertaken during the pandemic significantly differed to
previous years, and therefore the results for 2020 and 2021 are not included in this analysis as
they are not directly comparable with other years. 
The national survey results report shows that overall, between 2018 and 2022 there were
national-level improvements in neighbourhood connections following the pandemic - particularly
in relation to an increase in trust and a sense belonging to a community.  There were also
improvements in relation to local people taking action to improve their neighbourhoods.  
However, the 2024 figures suggest that these improvements have not been sustained, with many
measures now similar to their pre-pandemic levels. 
Impact of delivering The Plan for North Lanarkshire
Improvements in public feedback reflects improvements in services, for example in terms of
services becoming more accessible and responsive.  If more residents - especially those who
often face barriers - feel listened to and supported, confidence in local services grow.  As trust
builds, people are more likely to take part in community activities, share their views, and work
with local organisations to solve problems. This helps improve day-to-day issues such as
neighbourhood safety and enhancements to community spaces. 
When more people can get involved, contribute, and benefit from local opportunities, communities
become stronger, more resilient, and better able to cope with challenges and any wider (and
often uncontrollable) economical or environmental impacts on society.   
Page 97 of 454

Page 98

Breastfeeding - % of babies breastfed at 6-8 week review (c09) 
What this means
• This measure shows the proportion of babies that are being breastfed at the 6-8 week review
stage (this includes mixed feeding, which means receiving both breast and formula milk).  
• Data is collected at routine child health reviews at around 6 to 8 weeks of age and recorded on
the Child Health Systems Programme (CHSP) pre-school system.
• The number of children eligible for review is defined as the number of children who turned the
appropriate age (i.e. 6 weeks for 6-8 week review) during the year of interest and who were
active on the Scottish Immunisation and Recall System (SIRS).
• As reviews also take place at 10-14 days old and 13-15 months, this analysis includes data for
these periods to give added context relating to the short and longer-term position. 
Why this matters
• Tracking this information helps assess whether babies in North Lanarkshire are getting the 
healthiest start in life.  Breastfeeding provides optimal nutrition for infants and young children,
supports their short and long-term health (including reducing the risk of infections), and offers
important health benefits for mothers.
• Current guidance recommends exclusive breastfeeding for the first six months of life, followed
by continued breastfeeding alongside solid foods up to at least a child’s second birthday.   
Latest performance 
% of babies breastfed at 6-8 week review 
Performance indicator 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25
% of babies breastfed at 6-
8 week review - North
Lanarkshire
23.1 26.1 27.2 27.8 26.6 30.4 30.0 35.6
% of babies breastfed at 6-
8 week review - Scotland 41.7 43.2 43.9 45.2 45.7 46.8 49.0 51.2
Comparative average for
the group of similar
councils*
not available 36.3 38.2 37.8 40.7 42.7 46.7 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
% of babies breastfed at the first review (around 10-14 days old) 
Performance indicator 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25
% of babies breastfed at the first
review (around 10-14 days old) -
North Lanarkshire
45.4 46.1 45.8 48.6 50.7 53.3
Page 98 of 454

Page 99

% of babies breastfed at the first
review (around 10-14 days old) -
Scotland
65.1 65.6 65.0 66.1 67.8 69.0
Comparative average for the group
of similar councils* 56.1 57.1 55.7 58.6 61.0 63.1 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
% of babies breastfed at 13-15 month review 
Performance indicator 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25
% of babies breastfed at 13-15
month review - North Lanarkshire 13.7 14.2 15.5 14.5 15.9 14.7
% of babies breastfed at 13-15
month review - Scotland 20.4 20.9 21.6 21.1 21.4 21.5
Comparative average for the group
of similar councils* 15.7 16.6 18.0 17.1 18.9 20.2 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
How North Lanarkshire has performed
After a flat trend in the previous year, the latest figures in Figure 09a show a significant increase,
with 35.6% of babies breastfed at the 6-8-week review - up from the previous high of 30.4%. 
% of babies breastfed at 6-8 week review
• Figure 09a shows that the improving trends for breastfeeding in North Lanarkshire have
followed the level of improvement seen nationally. 
• This also shows that the latest figure of 35.6% is a significant improvement from The Plan for
North Lanarkshire baseline of 23.1% in 2017/18 (this equates to 225 more babies). 
• This shows an improvement in babies in NL who are not breastfed at their 6-8 week review Page 99 of 454

Page 100

from 76.9% to 64.4% over the period of The Plan for North Lanarkshire. 
% of babies breastfed at the first review (around 10-14 days old)
• Figure 09b shows that North Lanarkshire has experienced a small year on year improvement
in the proportion of babies breastfed at the first review (around 10-14 days old), which follows
the trend in the level of improvement seen nationally.
• The latest figures show that 53.3% of babies in North Lanarkshire are breastfed at the first
review (around 10-14 days old), compared to a national average of 69%.  Other local authority
comparisons are not available earlier than 2019/20 for this measure. 
% of babies breastfed at 13-15 month review
• Figure 09c shows that North Lanarkshire had experienced a small year on year improvement
in the proportion of babies breastfed at the 13-15 month review, which had been on a par with
the level of improvement seen nationally.
• However, the latest figures show that this had dipped slightly from 15.9% to 14.7% of babies in
NL are breastfed at the 13-15 month review (compared to a national average of 21.5% which
had remained relatively steady from the previous year).  
• This is in contrast to the comparative average for the group of similar councils where babies
breastfed at the 13-15 month review had increased over the same period (from 18.9% to
20.2%).  Other local authority comparisons are not available earlier than 2019/20 for this
measure. 
North Lanarkshire’s figures for review at 10-14 days old and 6-8 weeks show a positive improving
position that mirrors the trend in both the national average and the comparative average for the
group of similar councils (Figures 09a and 09b). 
Latest results show that over half of all new babies in North Lanarkshire are breastfeed at the first
review (around 10-14 days old), but the ability to sustain this can be shown to drop by time of the
6-8 week review and by the time of the 13-15 month review where the results show a decrease
from the previous to the current year (15.9% to 14.7%). 
Figures 09a, 09b, and 09c show that North Lanarkshire is performing below the national average
and the comparative averages for the group of similar councils, but is generally following the
same trend. 
On average around 3,000 children in North Lanarkshire are eligible for a review at each of the
three stages. Only Glasgow and Edinburgh have a higher number of eligible children to be
reviewed.   
Impact of delivering The Plan for North Lanarkshire
Improving breastfeeding rates means better health for babies and mothers. For babies, it means
better nutrition, stronger immunity, and healthier development in the early months of life. Mothers
also benefit, with reduced risks of certain cancers and improved wellbeing.   
Higher breastfeeding rates contribute to a healthier population overall and ease pressure on
health services by reducing preventable illnesses. Together, these outcomes help create a place
where families feel supported, children get the best start in life, and long-term health and
resilience can be improved.
Page 100 of 454

Page 101

Child wellbeing - % of children reviewed at 27-30 months with no
concerns recorded (c10) 
What this means
• This measures the proportion of all children receiving a 27-30 month review that had no
concerns across all of the nine developmental domains (i.e. social, emotional, behavioural,
attention, speech language and communication, gross motor skills (large body movements),
fine motor skills (small muscle movements and hand-eye co-ordination), vision, and hearing.
• During a child’s 27-30 month review, a health professional (normally a health visitor) assesses
a child’s developmental status and records the outcome (e.g. no concern, concern newly
suspected as a result of the review, or concern or disorder already known prior to the review)
against each of the nine developmental domains.
• All available records for children turning 27 months in the period are included in the
assessment as long as a review takes place before a child turns 3 years. 
Why this matters
• Measuring the proportion of children with no concerns at their 27-30 month review shows how
well children are being supported at a critical developmental stage, as strong early progress
provides the foundation for future learning, employment, and wellbeing.
• The 27-30 month review captures a crucial stage in a child’s growth, including speech and
language, social skills, physical development, and emotional wellbeing.  Strong early
development is linked to better educational outcomes, stronger family stability, and fairer life
chances throughout childhood and beyond. 
Latest performance 
% of children reviewed at 27-30 months with no concerns recorded 
Performance indicator 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24
% of children reviewed at 27-
30 months with no concerns
recorded - North Lanarkshire
81.0 83.7 82.2 82.8 82.8 79.2 79.6 81.8
% of children reviewed at 27-
30 months with no concerns
recorded - Scotland
82.4 84.6 85.5 85.7 85.1 82.2 82.1 83.3
Comparative average for the
group of similar councils* 78.2 80.8 80.3 80.7 81.0 77.9 77.3 79.8 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
Page 101 of 454

Page 102

% of children reviewed at 27-30 months with at least one concern recorded 
Performance indicator 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24
% of children reviewed at 27-
30 months with at least one
concern recorded - North
Lanarkshire
19.0 16.3 17.8 17.2 17.2 20.8 20.4 18.2
% of children reviewed at 27-
30 months with at least one
concern recorded - Scotland
17.6 15.4 14.5 14.3 14.9 17.8 17.9 16.7
Comparative average for the
group of similar councils* 20.7 19.2 19.8 19.0 19.8 22.4 22.9 20.5 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire).  
How North Lanarkshire has performed
Latest results show 81.8% of children in North Lanarkshire have no concerns in any
developmental domain at their 27-30 month review. 
• The latest results for North Lanarkshire (81.8%) are an improvement from the previous year
(79.6%) in terms of the number of children who have no concerns in any developmental
domain (Figure 10a).
• The trend in the proportion of children with no concerns in any domain remains less than the
highest level recorded in 2017/18 (83.7%), but higher than The Plan for North Lanarkshire
baseline of 81%.
• Along with the improvement in the proportion of no concerns recorded, there is a
corresponding decrease in the proportion where one or more concerns have been recorded
which is a positive movement.
• Figure 10b shows where one or more concerns have been recorded - this has decreased to
18.2% in the latest results from 20.4% the previous year.   
North Lanarkshire’s results for both indicators show a positive improving position that mirrors the
trend in both the national average and the comparative average for the group of similar councils. 
Figure 10a and Figure 10b also show that North Lanarkshire is performing better than the
comparative average for the group of similar councils (81.8% and 18.2% compared to 79.8% and
20.5% respectively). 
This indicator records the average number of concerns identified at case conferences / planning
meetings of children who are on the child protection register.  The pandemic led to changes in
how reviews were delivered as well as the circumstances of daily life for many children in 2020/21
and 2021/22. As such, factors related to assessment, recording, and genuine changes in
developmental issues may have impacted on the data for these years.
Page 102 of 454

Page 103

Impact of delivering The Plan for North Lanarkshire
Improvements in this indicator means that more children are developing well at the 27-30 months
review point.  It means they are more likely to start nursery and school ready to learn, giving them
a stronger platform for good educational outcomes.  This early readiness increases the likelihood
of progressing into positive destinations such as training, employment, and productive adulthood,
contributing to a more skilled and resilient future workforce. 
Strong early development also supports a families’ ability to participate in the local economy.
When children are healthy, confident, and meeting developmental milestones, parents face fewer
childcare challenges, fewer health appointments, and less stress. This reduces barriers to
employment and training, enabling more parents - particularly mothers and carers - to enter or
remain in work.
Page 103 of 454

Page 104

Educational attainment - % of pupils achieving 5 or more awards at
level 6 (c11 / c12) 
What this means
• This indicator provides a measure of achievement for secondary school pupils (in the senior
phase 4 to 6, typically 15 to 18 year olds) who appear on the pupil census for local authority
schools.  It represents the percentage of pupils gaining 5 or more awards at Scottish Credit
and Qualifications Framework (SCQF) level 6.
• A SCQF Level 6 is essentially a higher in the Scottish education system (however not
all SCQF Level 6 qualifications are traditional Highers as the level represents the difficulty of
the learning, not just the type of qualification. 
• Measuring attainment in this manner for all pupils - as well as for those living in the 20% most
deprived areas (as per the Scottish Index of Multiple Deprivation (SIMD)) - provides one way
to carry out a high level assessment of the attainment gap. 
Why this matters
• Tracking this information provides a clear picture of how well education systems are
performing and whether young people are developing the skills needed for employment and
life.  Because education is closely linked to employment, income, and health, and wellbeing,
tracking attainment supports evidence-based decisions that improve both individual life
chances and wider social and economic outcomes.
• Educational attainment helps shape people’s opportunities in the labour market and the level
at which they can participate. Higher levels of attainment typically open up access to a wider
range of jobs and support better long-term outcomes, allowing individuals to progress based
on their skills and efforts rather than their circumstances. 
Latest performance 
All pupils 
Performance indicator 2017
-18
2018
-19
2019
-20
2020
-21
2021
-22
2022
-23
2023
-24
2024
-25
% of pupils achieving 5 or
more awards at level 6
- North Lanarkshire
34.0 34.0 39.0 39.0 36.0 35.0 36.0 39.0
% of pupils achieving 5 or
more awards at level 6 -
Scotland
36.0 36.0 40.0 42.0 39.0 38.0 39.0 41.0
Comparative average for
the group of similar
councils*
30.0 32.0 35.0 36.0 33.0 32.0 33.0 34.0 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
Page 104 of 454

Page 105

Pupils living in the 20% most deprived areas (as per the Scottish Index of Multiple Deprivation (SIMD)). 
Performance indicator 2017
-18
2018
-19
2019
-20
2020
-21
2021
-22
2022
-23
2023
-24
2024
-25
% of pupils achieving 5 or
more awards at level 6
- North Lanarkshire
20.0 22.0 24.0 24.0 22.0 23.0 22.0 25.0
% of pupils achieving 5 or
more awards at level 6 -
Scotland
18.0 19.0 22.0 24.0 22.0 22.0 23.0 24.0
Comparative average for
the group of similar
councils*
18.0 19.0 22.0 23.0 22.0 22.0 22.0 23.0 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
How North Lanarkshire has performed
Due to the pandemic, the time period covered by the data reflects four distinct approaches to
assessment and certification of SQA attainment.  This includes a longstanding use of exams and
externally assessed coursework (pre-pandemic), the use of estimates as a basis for awards in
2020, an Alternative Certification model in 2021, and the return of formal exams in 2022 with
adjustments in place to mitigate the ongoing effects of the pandemic.   
The different circumstances and awarding processes of 2019, 2020, 2021, and 2022 do not
therefore allow for a wholly accurate comparison across the years and therefore this context
needs to be taken into account when reviewing the data and trends for this indicator. 
All pupils
• Latest results for educational attainment in North Lanarkshire (39%) show an increasing trend
that is in line with the national average and the comparative average for the group of similar
councils.   
• The latest results (39%) show an improvement from the previous year (36%) and The Plan for
North Lanarkshire baseline (34%). 
North Lanarkshire’s latest results (39%) are lower than the national average (41%) but higher
than the comparative average for the group of similar councils (34%). 
Pupils living in the 20% most deprived areas (as per the Scottish Index of Multiple Deprivation (SIMD)).
• Latest results for educational attainment in North Lanarkshire (25%) show improvement from
the previous year at a slightly greater rate than the national average and the comparative
average for the group of similar councils.   
• The latest results (25%) show an improvement from the previous year (22%) and The Plan for
North Lanarkshire baseline (20%). 
North Lanarkshire’s latest results (25%) are higher than the national average (24%) and the Page 105 of 454

Page 106

comparative average for the group of similar councils (23%). 
Gap in percentage points between C11 (all pupils) and C12 (pupils living in the 20% most deprived areas (as per
the Scottish Index of Multiple Deprivation (SIMD)). 
Performance indicator 2017
-18
2018
-19
2019
-20
2020
-21
2021
-22
2022
-23
2023
-24
2024
-25
Gap in percentage points
between C11 and C12
- North Lanarkshire
14 12 15 15 14 12 14 14
Gap in percentage points
between C11 and C12 -
Scotland
18 17 18 18 17 16 16 17
Comparative average for
the group of similar
councils*
12 13 13 12 11 10 10 10 
Figures 11a and 12a show a difference in attainment at this level between those pupils living in
the 20% most deprived areas, compared to the overall student population.   
• Between the overall figure (c11), and that for those living in the most deprived areas (c12), the
gap in North Lanarkshire is smaller than it is nationally - there is a 14 percentage point
difference in attainment in respect of 5 or more awards at level 6 or above in North
Lanarkshire compared to a 17 percentage point gap nationally.  The comparative average gap
for the group of similar councils is lower at 10 percentage points.
• Over the period of The Plan for North Lanarkshire the gap in North Lanarkshire has remained
the same.  However, care should be taken when interpreting this result as the approach to
assessing attainment has changed over the years and this is only one high level way of
assessing the attainment gap, there are a range of other measures used in the education
sector specifically for this purpose. 
Impact of delivering The Plan for North Lanarkshire
Educational attainment plays a central role in delivering inclusive growth and prosperity for all
because it shapes people’s ability to participate fully in the economy and in society. Higher levels
of education are strongly linked to better employment prospects, higher earnings, and greater job
security. When more people gain relevant qualifications and skills, productivity increases,
businesses can grow, and economic benefits are spread more widely rather than concentrated
among a small group. 
Higher educational attainment can widen opportunities for people living in deprived areas.
Reducing attainment gaps supports social mobility by improving access to further learning,
training, and employment and helps break cycles of disadvantage. Over time, this helps reduce
poverty, strengthens community resilience, and reduces demand pressures on services.
Page 106 of 454

Page 107

Post school destinations - % of pupils entering positive post school
destinations (c13) 
What this means
• This measure counts school leavers from publicly funded mainstream schools and reports
initial destinations approximately three months after the end of the school year.
• Positive destinations include higher education, further education, employment, training,
voluntary work, and personal skills development. 
Why this matters
• Measuring positive post-school destinations is important because it shows whether young
people are accessing meaningful education, training, or employment that leads to long-term
opportunity. Tracking these measures also helps to target support to groups who may be at
risk of being left behind. 
Latest performance 
Performance indicator 2016
-17
2017-
18
2018-
19
2019-
20
2020-
21
2021-
22
2022-
23
2023-
24
2024
-25
% of pupils entering
positive post school
destinations - North
Lanarkshire
91.8 93.4 94.3 92.2 94.5 94.2 94.7 94.2 93.9
% of pupils entering
positive post school
destinations - Scotland
93.9 94.6 95.0 93.3 95.5 95.7 95.9 95.7 95.7
Comparative average for
the group of similar
councils*
93.8 93.7 95.0 92.5 94.5 95.3 96.2 95.6 94.6 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
Page 107 of 454

Page 108

How North Lanarkshire has performed
The latest results show that 93.9% of young people in North Lanarkshire (3,384 out of 3,605)
achieved a position destination. 
• The lates results (93.9%) show a small decrease from the previous year when 94.2% (3,623
out of 3,848) achieved a position destination but show improvement from The Plan for North
Lanarkshire baseline of 91.8% (Figure 13a).
• The latest result of 93.9% equates to 3,623 leavers achieving a positive destination out of
3,384 meaning 221 leavers did not achieve a positive destination (Figure 13b). 
• Reviewing the % result for this indicator does not necessarily show the full position in terms of
the number of leavers achieving a positive destination.  A more meaningful result is the
number of pupils not achieving a positive destination over the years.  As shown in Figure 13b
this showed considerable improvement immediately following The Plan for North Lanarkshire
baseline (from 303 to 232) and has remained above 200 since. 
• Figure 13c shows the main destinations for leavers (higher education, further education,
employment, and training) where the data reflects the change in numbers over the period of
The Plan for North Lanarkshire. 
Figure 13c only reflects the four main positive destinations (i.e. higher education, further
education, employment, training) so figures will not add up to the totals in Figure 13b. 
The trend in achieving positive post-school destinations in North Lanarkshire over the years has
mirrored that of both the national position and the comparative average for the group of similar
councils, although figures remain slightly lower. 
Impact of delivering The Plan for North Lanarkshire
Improving positive destinations ensures more young people progress into education, training, or
employment that builds their skills, confidence, and long-term prospects. Strong destination
outcomes develop a skilled local workforce, reduce future unemployment, and raise earning
potential - all of which strengthen the local economy. 
A more resilient workforce helps employers fill skills gaps and supports higher productivity, which
in turn creates a stronger labour market and a broader, more sustainable tax base. Ultimately,
improving post-school destinations ensures every young person can participate fully in the
economy, enabling people and communities to thrive.
Page 108 of 454

Page 109

School exclusion rate per 1,000 pupils - all children (indicator c14) / 
looked after children (c15) 
What this means
• This measures the number of exclusion cases in terms of (a) both primary and secondary
school pupils and (b) looked after children.
• As pupils can be excluded more than once in a year, a single pupil may be counted more than
once in the figures - for this reason this measures the number of cases of exclusion, not the
number of pupils.
• For looked after children, figures are for the local authority responsible for the looked after
child as looked after children may attend school in a different local authority to the one that is
responsible for them.
• Data in respect of school exclusions is only published nationally every second year. 
Why this matters
• Measuring this will show if interventions have reduced the number of children not in education. 
• Research shows that lower levels of attendance can negatively impact a young person's
participation, attainment, and future opportunities. Missing even 10% of schooling over a year
can significantly affect academic performance.   
Latest performance 
All children 
Performance indicator 2016-17 2018-19 2020-21 2022-23 2024-25
Rate of exclusion per 1,000 pupils - North
Lanarkshire 35.1 35.0 15.3 11.6 9.7
Rate of exclusion per 1,000 pupils – Scotland 26.8 21.7 11.9 16.6 15.2
Comparative average for the group of similar
councils* 29.3 21.0 13.7 17.9 17.1 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
Looked after children 
Performance indicator 2016-17 2018-19 2020-21 2022-23
Exclusions case rate per 1,000 pupils who were
looked after - North Lanarkshire 317.9 293.3 95.7 26.7
Exclusions case rate per 1,000 pupils who were
looked after - Scotland 210.2 152.2 77.8 96.9
Page 109 of 454

Page 110

Comparative average for the group of similar
councils* 218.2 122.5 111.3 100.2 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
How North Lanarkshire has performed
North Lanarkshire’s schools have seen a positive decrease in exclusion rates for both all children
and looked after children over the period of the reported data. 
All children
• The latest figures reflect the lowest rate for North Lanarkshire over the reported data (9.7 per
1,000 pupils) which is lower than both the national average (15.2) and comparative average
for the group of similar councils (17.1).
• Over the period of The Plan for North Lanarkshire overall exclusion rates have improved by
72% from 35.1 per 1,000 pupils to 9.7.
• This is a significant improvement in North Lanarkshire compared to lower improvements over
the same period in both the national average (43%) and the comparative average for the
group of similar councils (42%). 
Looked after children
• The latest figures reflect the lowest rate for North Lanarkshire over the reported data (26.7 per
1,000 pupils) which is lower than both the national average (96.9) and comparative average
for the group of similar councils (100.2).
• Over the period of The Plan for North Lanarkshire exclusion rates for looked after children
have improved by 92% from 317.9 per 1,000 pupils to 26.7.
• This is a significant improvement in North Lanarkshire compared to lower improvements over
the same period in both the national average and the comparative average for the group of
similar councils (both 54%). 
The trend in school exclusions in North Lanarkshire is mirrored in the comparison with the
exclusion rates in the group of similar councils for both all children and looked after children. 
Although in both instances the trend in North Lanarkshire has improved from being above the
national and comparative group averages to below the averages, a significant improvement. 
Impact of delivering The Plan for North Lanarkshire
Good attendance fosters a strong sense of school connectedness, which is associated with better
outcomes in attainment, wellbeing, and reduced involvement in offending behaviours. Regular
attendance also serves as a protective factor for children experiencing adversity or trauma,
supporting early intervention and positive development. 
Reducing the number of children excluded from school which will have a positive impact on a
child’s participation, attainment, and future opportunities.  
Page 110 of 454

Page 111

Gross value added (GVA) - economic growth per head of population
(c16) 
What this means
• GVA (Gross Value Added) measures the value of goods and services an area produces -
essentially, how much the local economy creates. Per head divides that total by the number of
people living in the area.
• GVA growth per head shows whether the economic output per person is rising or falling.
• This measure uses the income approach which allocates income to the region in which the
economic activity takes place. The data in this time series is rebased and recalculated each
year at current basic prices when new results are produced.   
Why this matters
• Measuring GVA growth per head is important because it shows whether economic output is
increasing faster than the population, giving a clearer picture of how prosperity is changing for
each person. Rising GVA per head indicates stronger productivity, higher earnings potential,
and a more resilient local economy, while flat or falling GVA per head can signal that growth
isn’t translating into improved living standards. 
• GVA is widely used as a core indicator of local economic performance because it reflects the
value available to share between workers and businesses. 
Latest performance 
Performance indicator 2016 2017 2018 2019 2020 2021 2022 2023
GVA per head of population
at current basic prices -
North Lanarkshire
£21,198 £22,712 £23,262 £24,291 £23,533 £25,260 £27,020 £30,394
GVA per head of population
at current basic prices -
Scotland
£24,822 £25,970 £26,386 £27,319 £25,869 £27,722 £30,634 £33,419 
* A comparative average for the group of similar councils is not possible for this measure as GVA is recorded by regional areas
which means for some areas several local authorities have the same combined figure. This also means that local authority
areas are combined on a geographical basis rather than based on deprivation or population density, so calculating an average
of other areas does not provide a meaningful comparison in this instance. 
Page 111 of 454

Page 112

How North Lanarkshire has performed
The latest results shows that GVA growth in North Lanarkshire remains positive suggesting the
local economy continues to grow, and does so at a greater rate than the national average. 
• The latest results show a 12.5% increase in GVA per head in North Lanarkshire from 2022 to
2023 which is an improving trend following year on year growth of 7% recorded in the previous
year (Figure 16b).  The 12.5% growth in the latest results is the highest growth level over the
recorded data.
• Looking at the baseline for The Plan for North Lanarkshire, GVA per head of population at
current prices shows that North Lanarkshire has seen a rise of 43.4% from £21,198 in 2016 to
£30,394 in 2023 (Figure 16a), compared to an increase of 34.6% nationally over the same
period.
• The extent of growth in North Lanarkshire shows significant movement from a position of 
-3.1% during the pandemic to the latest results of +12.5% in three years (nationally this
position moved from -5.3% to +9.1% over the same period). 
• Figure 16b displays the % change in economic growth from one year to the next  - the
historical trends for the last 10 years and beyond not only show positive movement (which has
continued over the period of The Plan for North Lanarkshire), it also shows economic growth in
North Lanarkshire has steadily remained in line with, or above, the national average.   
There is a time lag in the availability of these results with the most recent for 2023 being
published in April 2025.  However, the period covered by the most recent results clearly reflects
the impact of the pandemic - with the dip in North Lanarkshire in 2020 (which mirrored the
national position) followed by successive years of growth.   
Impact of delivering The Plan for North Lanarkshire
Increasing GVA per head means that the economy is generating more value for each person,
signalling rising productivity and higher potential incomes. This strengthens the local labour
market, attracts investment, and supports better-quality jobs. 
As GVA per head adjusts for population size, higher GVA also shows that growth is translating
into improved living standards rather than being diluted by demographic change.  As output per
person rises, the tax base grows, giving public services more capacity to invest in local priorities. 
Page 112 of 454

Page 113

Average gross weekly pay - for North Lanarkshire’s residents (c17) 
What this means
• This measures the average earnings in pounds for employees living in the area who work full-
time and are on adult rates of pay and whose pay was not affected by absence.
• Earnings information collected relates to gross pay before tax, national insurance or other
deductions, and excludes payments in kind.
• The data for this indicator is derived from a national survey (the national Annual Survey of
Hours and Earnings); it therefore represents a sample of the population relating to a pay
period in April each year. They survey does not cover those who are self-employed. 
Why this matters
• Measuring gross weekly pay for local residents is important because it shows whether people
are earning enough to support a decent standard of living, including everyday costs like rent,
food, transport, and childcare. It highlights whether local jobs are mainly low-paid or if
residents are having to rely on overtime, multiple jobs, or in-work benefits to get by.  
• Understanding earnings levels also helps assess job quality, not just job quantity.  It shows
whether local employers are offering competitive pay, which influences whether people stay in
an area or commute elsewhere for better-paid work.  It also provides a clearer picture of
whether economic growth is genuinely improving people’s lives. 
Latest performance 
Performance indicator 2018 2019 2020 2021 2022 2023 2024 2025
Gross weekly pay - North
Lanarkshire £545.70 £567.20 £576.90 £592.70 £657.90 £711.00 £739.00 £775.10
Gross weekly pay -
Scotland £562.70 £578.30 £595.00 £619.90 £641.30 £709.40 £740.10 £775.60
Comparative average for
the group of similar
councils*
£549.70 £566.90 £592.50 £620.40 £635.70 £689.00 £721.50 £745.50 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
Page 113 of 454

Page 114

How North Lanarkshire has performed
Gross weekly pay for North Lanarkshire’s residents became higher than the average earnings
nationally for the first time ever in 2022.  Results each year show gross weekly pay has continued
to increase positively year on year since. 
• The latest results for gross weekly pay in North Lanarkshire show this to be £775.10 (Figure
17a) - an increase of £36.10 from the previous year (Figure 17c), this is higher than the
average increase of £35.50 nationally over the same period.
• The Plan for North Lanarkshire baseline set in 2018 saw gross weekly earnings to be £545.70;
at the time this was £17 lower than the national average of £562.70. Prior to this the widest
gap in average earnings for North Lanarkshire compared to Scotland was £42 in 2009 before
the gap reduced to its narrowest point in 2019 (£11.10) just before the pandemic.
• Since 2018, this gap has seen year on year improvement and reached a point in 2022 where
North Lanarkshire’s gross weekly wage was £16.60 higher than the national average.  This
position has remained steady, with year on year gross weekly pay increases in North
Lanarkshire tracking the national average. 
• Figure 17b shows the difference between the average gross weekly pay in North Lanarkshire
compared to Scotland, which has improved over the period of The Plan for North Lanarkshire
from £17 lower to a 50p difference per week.
• Figure 17c shows at the time of The Plan for North Lanarkshire baseline wages had increased
by £19.90 from the previous year, the latest results show the increase from the previous year
now £36.10. 
The trend in gross weekly pay in North Lanarkshire is mirrored in the comparison with the
national average. The comparative average gross weekly pay for the group of similar councils
(£745.50) is lower than North Lanarkshire, and has experienced a lower year on year increase
(£24.00) compared to £36.10 in North Lanarkshire and £35.50 nationally. Page 114 of 454

Page 115

Impact of delivering The Plan for North Lanarkshire
Improving gross weekly pay rates for residents increases household income and helps people
meet their essential needs. When wages rise, residents typically have more stability, can plan
ahead, and are better able to support the local economy by having more disposable income,
boosting spending in local shops, services, and businesses. By reducing in-work poverty, better
pay supports a higher quality of life for lower-income households. 
As earnings rise, so too does the local tax base, enabling greater investment in public services
and community priorities. Overall, improving pay levels strengthens the resilience of the labour
market and ensures that economic growth benefits more people and places. 
Page 115 of 454

Page 116

Economically active - % of the working age population who are
economically active (c18) 
What this means
• This measures the proportion of the working age population who are economically active.
• A person's economic activity is derived from their activity last week; people who are
economically active are those who are either in employment or unemployed (but actively
looking for work, waiting to start a new job, or available to start a new job). 
• This data comes from the Annual Population Survey (APS), the largest regular household
survey in the UK. It includes data from the Labour Force Survey, plus further sample boosts. 
• As the survey includes data from a sample, figures are therefore estimates which are subject
to sampling variability. 
• Economically inactive people are those who are neither employed nor unemployed; they're not
in paid work, but they're also not looking for a job or available to start work. A person might be
economically inactive for a number of reasons, such as being retired, a student, or too ill to
work. 
Why this matters
• Measuring economic activity is important because it shows not just how fast the economy is
growing, but who is benefiting from that growth. It helps identify barriers that limit participation,
particularly for disadvantaged groups, and provides evidence to design policies that support
wider access to jobs, skills, and opportunities. 
Latest performance 
Performance
indicator
September
2018
September
2019
September
2020
September
2021
September
2022
September
2023
September
2024
September
2025
% economically
active - North
Lanarkshire
77.9 77.5 75.7 71.4 68.8 75.0 74.0 77.1
% economically
active - Scotland 77.6 77.8 76.7 76.1 77.2 77.9 76.4 77.3
Comparative
average for the
group of similar
councils*
74.9 76.1 75.3 75.5 75.6 74.4 72.7 73.1 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
Page 116 of 454

Page 117

How North Lanarkshire has performed 
Economically active
• Figure 18a shows not only a period of relative stability over the 10 years prior to 2020, but also
that the % of people economically active in NL exceeded the national average at times.  This
period included the 2018 baseline for The Plan for North Lanarkshire and shows that North
Lanarkshire figures continued to follow the national average throughout 2019 and into early
2020.
• In 2020 this indicator started to show a decline and remained unsteady before reaching its
lowest point to date as at September 2022 (68.8%); the timing of this suggests figures were
impacted by the pandemic.  Small gains have been recorded periodically thereafter, with the
most recent showing an increase for the last six consecutive quarters from 70.5% as at March
2024 to 77.1% as at September 2025.  
• In North Lanarkshire, this equates to around 173,600 people economically active (Figure 18b)
with figures almost returning to the pre-pandemic level in 2019 (174,000).
• The latest results (77.1%) are now only slightly below The Plan for North Lanarkshire baseline
(77.9%). 
Figure 18a shows that the trend in North Lanarkshire did not follow that of the national average
during and after the period of the pandemic, however the latest results show figures returning to a
similar position with 77.1% economically active in North Lanarkshire compared to 77.3% in
Scotland overall. 
Economically inactive 
Page 117 of 454

Page 118

• Figure 18c shows not only a period of relative stability over the 10 years prior to 2020, but
also that the % of people economically inactive in North Lanarkshire was below the national
average at times.  This period included the 2018 baseline for The Plan for North Lanarkshire
and shows that North Lanarkshire figures continued to follow the national average throughout
2019 and into early 2020.
• In 2020 this indicator started to show an increase and remained unsteady before reaching its
highest point to date as at September 2022 (31.2%); the timing of this suggesting figures
were impacted by the pandemic.  Small gains have been recorded periodically thereafter, with
the most recent showing a decrease for the last six consecutive quarters from 29.5% as at
March 2024 to 22.9% as at September 2025.  
• In North Lanarkshire, this equates to around 50,500 people economically active (Figure 18d)
with figures almost returning to the pre-pandemic level in 2019 (48,700).
• The latest results (22.9%) are now only slightly below The Plan for North Lanarkshire
baseline (22.1%). 
Figure 18c shows that the trend in North Lanarkshire did not follow that of the national average
during and after the period of the pandemic, however the latest results show figures returning to a
similar position with 22.9% economically inactive in North Lanarkshire compared to 22.7% in
Scotland overall. 
The latest results show consistent trends in the make up of those who are economically inactive,
with the highest proportion remaining long-term sick (43%), students (21%), looking after family /
home (16%), retired (10%), and other (10%). 
Since 2020, the lowest recorded level of economic inactivity due to long-term sick was in early
2020 (31.5%, around 17,400 people).  This fluctuated over the following years, rising to a high of
51.1% at December 2024 before dropping the latest figure of 42.9% (around 21,700).   
Self-employed 
Page 118 of 454

Page 119

• Figure 18e shows that, prior to the pandemic, the number of people who were self-employed
in North Lanarkshire as a proportion of the working age population was 7.8% in 2019.
• Self-employed rates then experienced an almost continual downward trend to 3.7% as at 
December 2021.  Since December 2021 figures have fluctuated over the years, reaching a
high of 7.4% as at September 2024 which has dropped slightly to 6.8% as at September 2025.
• These latest rates account for around 15,900 people as at September 2025.  
• The latest rates account for 17,500 people self-employed as at September 2024 - a significant
increase that returns self-employment levels in North Lanarkshire to pre-pandemic figures.
• As shown in Figure 18e, over the period of The Plan for North Lanarkshire self-employed rates
have decreased slightly from 7.7% to 6.8% (from around 17,800 to 15,900), with significant
fluctuations over that time. 
Figure 18e shows that self-employed trends in North Lanarkshire over the years have not wholly
followed that of the national average, and the latest results (6.8%) while showing a small
increase, are below the position for Scotland overall (7.7%). 
Impact of delivering The Plan for North Lanarkshire
Increasing the number of people in work supports local economic growth by widening
participation in the labour market, reducing poverty, and improving living standards. More people
earning a stable income can better support themselves and their families, leading to improved
financial security, health, and overall wellbeing. 
At a community level, higher employment strengthens the local economy through increased
spending in local businesses, a broader tax base, and reduced demand for public services. Over
time, this helps create more resilient places, with households better able to improve their
circumstances (through income, education, occupation, and quality of life) and a more stable
economic foundation. 
Page 119 of 454

Page 120

Businesses - % of the VAT / PAYE registered businesses that
survive for at least three years (c19) 
What this means
• This measures the number of VAT / PAYE registered businesses who have survived three
years after being created.
• Business sustainability data comes from the Businesses Demography 2024 publication
(published in November 2025) and produced by the Office for National Statistics (ONS) using
data from the Inter-Departmental Business Register (IDBR). The main administrative sources
for the IDBR are VAT trader and PAYE employer information passed to the ONS by HM
Revenue and Customs under the Value Added Tax Act 1994.  For VAT traders and the Finance
Act 1969 for PAYE employers, details of incorporated businesses are also passed to ONS by
Companies House.
• It is worth noting the time lag in measuring business sustainability over three years as this
requires three years’ worth of data from when a business was established, e.g. for a business
established in 2021, 2024 is the latest data available. 
Why this matters
• Measuring business sustainability over three years is important because it shows how resilient
local businesses are beyond their start-up phase. Higher survival rates mean more stable
jobs, stronger local supply chains, and consistent contributions to the local economy. 
• Tracking this measure also highlights whether businesses - especially small and medium sized
firms - are receiving the support they need to thrive. 
Latest performance 
Performance indicator 2016 2017 2018 2019 2020 2021 2022 2023 2024
% of the VAT / PAYE
registered businesses that
survive for at least three
years - North Lanarkshire
58.7 57.6 53.3 55.5 50.9 58.1 54.1 51.5 53.4
% of the VAT / PAYE
registered businesses that
survive for at least three
years - Scotland
62.1 60.4 55.6 56.5 55.9 59.0 57.4 56.0 57.6
Comparative average for
the group of similar
councils*
60.5 56.9 53.2 54.0 55.3 58.5 54.9 52.5 57.6 
* Based on the 8 councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
Page 120 of 454

Page 121

How North Lanarkshire has performed
3 year survival rates for businesses in North Lanarkshire shows a varying position over the years,
with the latest results for 2024 (published in November 2025) showing that 53.4% of businesses
registered in 2021 have survived for 3 years. 
• The latest results for North Lanarkshire of 53.4% (Figure 19a) are higher than the previous
year 51.5%.
• To review this in more context Figure 19b shows the shows the number of new VAT/PAYE
businesses registered each year, this shows there were 1,170 businesses registered in 2024,
the highest number for the last five years.
• Over the period of The Plan for North Lanarkshire, 3-year business survival rates have
decreased from 58.7% to 53.4%. 
• Figure 19a shows that trends in North Lanarkshire has followed the changes in the national
position, although to a lesser extent.
• The data shows that business survival rates in North Lanarkshire do reduce over time, for
example based on 1,155 businesses registered in 2019, 94.8% survived for 1 year (i.e. to
2020), 74% for 2 years (i.e. to 2021), 54.1% for 3 years (i.e. to 2022), 42.4% for 4 years (i.e.
2023), and 35.5% for 5 years (i.e. to 2024, as published in November 2025).  The national
picture shows a similar picture with corresponding survival rates being 94.7% (1 year), 75.9%
(2 years), 57.4% (3 years), 46.5% (4 years), and 39.3% (5 years). 
The trend in business survival rates in North Lanarkshire over the years does mirror the position
both nationally and with the comparative average for the group of similar councils, although North
Lanarkshire tracks slightly below.   
Impact of delivering The Plan for North Lanarkshire
Improving business sustainability rates means more local businesses are surviving beyond their
early years, creating stable jobs and reliable services that contribute consistently to the local
economy.  When businesses survive and grow, they spend more locally, support nearby suppliers
and help keep local places and spaces active. This builds a stronger local economy that attracts
further investment and gives residents more job and training opportunities. 
As businesses become more stable, they contribute more in taxes, helping fund local priorities.
Overall, higher business survival rates lead to a healthier economy and ensure more people and
communities benefit from local economic growth.s 
Page 121 of 454

Page 122

Benefits - % of the working age population claiming one or more of
the key employment related benefits (c20) 
What this means
• This measures claimant count which is the number of people claiming benefit principally for
the reason of being unemployed. 
• This is measured by combining the number of people claiming Jobseeker's Allowance (JSA)
and National Insurance credits with the number of people receiving Universal Credit principally
for the reason of being unemployed. During the week in which the claim is made this
measures claimants who declare that they are out of work, capable of, available for and
actively seeking work. 
Why this matters
• Measuring the number of working-aged people claiming benefits is important because it shows
how many residents are unable to access or sustain work, and how well the local economy is
supporting people into secure, sustainable employment. 
• High claimant numbers can signal practical issues such as a shortage of local jobs, health
conditions, low skills, or barriers like childcare or transport. Tracking this helps identify where
support is needed to help people move into, and stay in, work. 
Latest performance 
Performance indicator December
2018
December
2019
December
2020
December
2021
December
2022
December
2023
December
2024
December
2025
% of working age
people claiming one or
more of the key
employment related
benefits - North
Lanarkshire
3.5 3.6 6.4 4.4 3.3 3.3 3.1 2.8
% of working age
people claiming one or
more of the key
employment related
benefits - Scotland
2.7 3.2 6.0 4.0 3.2 3.0 3.0 2.9
Comparative average
for the group of similar
councils*
3.9 4.3 7.0 5.0 3.9 3.7 3.6 3.4 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
Page 122 of 454

Page 123

How North Lanarkshire has performed
The proportion of working age residents claiming employment related benefits continues to fall, a
trend first seen in 2020. At 2.8%, this is now the lowest point in the last eight years and lower than
the national average (2.9%). 
• In the years prior to The Plan for North Lanarkshire baseline of 3.5% in December 2018,
claimant count for North Lanarkshire had remained relatively low, increasing only to 3.7% in
March 2020.  April 2020 figures clearly showed the immediate impact of the pandemic with a
rise to 6.1% in North Lanarkshire compared to 5.5% nationally.  At this time, figures continued
to increase to a high of 7.2% in August 2020 which was in line with trends nationally.
• After August 2020 figures started on a relatively downward trend (albeit more gradual towards
the end of 2022 and into 2023), with figures as at December 2023 showing 3.3% of the
working age people now claiming one or more of the key benefits in North Lanarkshire,
compared to a national average of 3%. 
• This improvement has continued over the last two years with figures as at December 2024
showing 3.1% and as at December 2025 showing 2.8% (Figure 20a).    
• The latest claimant count rate for North Lanarkshire (2.8%) is now lower than The Plan for
North Lanarkshire baseline of 3.5%, with the number of people now claiming one or more of
the key benefits 6,170 compared to the baseline of 7,675 (Figure 20b). 
• The figure as at December 2025 of 6,170 people claiming work related benefits in North
Lanarkshire has decreased over the last year from 6,935 as at December 2024 and is the
lowest figure recorded since mid-2018. 
The trend in North Lanarkshire over the years mirrors that of the national average. The
comparative average for the group of similar councils also shows a similar trend over the years,
albeit this shows an average of 3.4% of working age residents claiming employment related
benefits, which is higher than North Lanarkshire.   
Impact of delivering The Plan for North Lanarkshire
Reducing the number of working-aged people who rely on employment-related benefits means
more residents are moving into, and sustaining, work. This strengthens the local workforce,
increases household income, and boosts spending in the local economy, helping businesses
grow and creating further job opportunities. 
It also reduces pressure on public services and allows more resources to be directed towards
community priorities. Most importantly, when people facing barriers are supported into
good-quality jobs, more residents can participate fully in the local economy. Overall, this leads to
a more resilient labour market and stronger communities. 
Page 123 of 454

Page 124

Qualifications - % of the working age population that have no formal
qualifications (c21) 
What this means
• This indicator measures the proportion of the working age population with no formal
qualifications, using data from the national Annual Population Survey (APS), which
provided high-quality, large-sample data for local area analysis on employment, education,
and health at local levels. 
• **The Office for National Statistics (ONS) has recently identified issues with how the APS is
operating.  While the survey remains reliable for national and broad regional estimates, the
quality of data for smaller population groups - such as individual local authorities - is
considered less robust. In addition, the weighting method used for the APS has not been
updated in line with the Labour Force Survey, meaning it is less representative of the current
population. As a result, these figures are classed as statistics in development, and should be
used with caution.  Work is ongoing within the council to monitor national developments and
determine whether this indicator can continue to be reliably reported, or whether a suitable
alternative measure will be needed. 
Why this matters
• Measuring how many residents have no formal qualifications is important because it highlights
where people may face barriers to getting secure, well-paid work and where it restricts their
ability to access current or developing employment opportunities.
• It helps identify skills gaps in the local workforce and shows where education, training, or
employability support is most needed. Tracking this over time also indicates whether local
programmes are helping people gain skills and access better job opportunities. 
Latest performance 
Performance indicator 2017 2018 2019 2020 2021 2022 2023 2024
% of the working age
population that have no
formal qualifications - North
Lanarkshire
13.6 15.4 15.1 12.8 18.6 14.4 14.3 12.8
% of the working age
population that have no
formal qualifications -
Scotland
8.7 9.7 9.8 8.1 7.7 8.0 8.2 8.2 
* A comparative average for the group of similar councils is not possible for the historical data for this has been removed from
the source website. 
Page 124 of 454

Page 125

How North Lanarkshire has performed 
Data sourced from the Annual Population Survey (to be considered in line with the
aforementioned caveat**)
Figure 21a shows a general downward trend over the years which shows ongoing improvement
in terms of the proportion of North Lanarkshire’s working age population that have no formal
qualifications. 
• Latest results in 2024 show a decrease to 12.8% from 14.3% in the previous year.  This is an
improvement from The Plan for North Lanarkshire baseline of 13.6%.
• The latest results show there are around 26,800 of North Lanarkshire’s population with no
formal qualifications (Figure 21b) - a decrease from The Plan’s baseline of 29,600.   
Data sourced from the Census
• Given the aforementioned caveat** regarding the data for this measure, some additional
context can be provided through the recent Census results for which data has been captured
in respect of the percentage of the population with the highest level of qualifications, although
it should be noted that Census data is only available every 10 years, and it reflects a moment
in time. 
• Figure 21c shows the proportion of North Lanarkshire’s population with no formal qualifications
as at the 2022 Census was 21.0% - a decrease from 33% in 2011 and 39.9% in 2001. 
Page 125 of 454

Page 126

Impact of delivering The Plan for North Lanarkshire
Improving the number of people who achieve formal qualifications has a wide range of positive
impacts for individuals, employers, and the local economy. When more residents gain
qualifications, they have better access to secure, higher-paid jobs and are more likely to progress
in work rather than remain in low-paid or unstable employment. This strengthens financial stability
for households, reduces the risk of poverty, and helps people manage rising living costs. 
A more qualified workforce also makes the area more attractive to employers, supports business
growth, and helps fill skills gaps in key sectors. This can lead to new job opportunities, higher
productivity, and stronger local competitiveness. Higher skills levels are linked with better health,
improved confidence, and increased participation in the community, all of which contribute to
stronger, more resilient neighbourhoods. 
Page 126 of 454

Page 127

Poverty - % of children living in poverty after housing costs (c22) 
What this means
• This indicator  shows the percentage of children who are in households with incomes - after
housing costs are removed - that are below 60% of the average (using the median).
• This data is obtained from the End Child Poverty publication which uses data from Scottish
Government: Children in Low-income Families: Local area statistics and the mid-year
Population Estimates published by the National Records of Scotland (NRS).
• The data uses the Department for Work and Pensions (DWP) / HM Revenue and Customs
(HMRC) local indicators combined with information about housing costs at a local level to
estimate poverty rates after housing costs. 
Why this matters
• This measure uses an indication of how much money families have left after housing costs, as
these costs vary hugely, so they change the real level of disposable income.  This gives an
indication of what is left for food, clothing, heating, transport, and social activities and, by doing
so and by using the 60% threshold and population estimates by age, provides an indication of
the proportion of children living in poverty.  
• A household income below 60% of the median is considered the poverty level in the UK and
many other nations because it serves as an international, relative standard for measuring who
is excluded from the minimum, acceptable standard of living in modern society.  
• The 60% threshold is designed to capture relative poverty, which tracks how low-income
households are doing compared to the rest of the population, rather than simply measuring
who can afford basic survival (absolute poverty). 
Latest performance 
Performance indicator 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24
% of children living in
poverty (after housing
costs) - North Lanarkshire
25.2 26.3 25.5 26.5 23.2 26.6 26.9 24.9
% of children living in
poverty (after housing
costs) - Scotland
20.6 20.7 20.2 21.7 19.8 21.6 21.8 20.7
Comparative average for
the group of similar
councils*
25.2 26.0 25.6 26.5 22.8 26.7 27.2 25.3 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire).   
Page 127 of 454

Page 128

How North Lanarkshire has performed
With the vision of inclusive growth and prosperity for all in The Plan for North Lanarkshire, this
indicator is of particular relevance to ensure that all of North Lanarkshire’s children get the best
start in life. 
The latest results show that 24.9% of children are living in poverty (after housing costs) in North
Lanarkshire, while this is an improvement from the previous year it’s still reflects approximately
one in four children. 
• Significant improvements were noted in the proportion of children in poverty over the initial
period of The Plan for North Lanarkshire - from a baseline of 25.2% to 23.2% in 2020/21
(Figure 22a).  
• After 2020, figures increased to 26.6% and then to 26.9%.  This trend was experienced
nationally across all of Scotland with rates having been impacted by the pandemic and
subsequent increased living costs.
• The latest results show a reversal nationally and locally with improvement recorded in terms of
the proportion of children in poverty.  This includes improvement in North Lanarkshire where
rates have dropped from 26.6% to 24.9% which is lower than The Plan for North Lanarkshire
baseline (25.2%). Factors such as economic growth and investment in social policies and
initiatives are considered to have contributed to the recent positive change in this respect. 
While the latest results for North Lanarkshire (24.9%) show improvement from the previous year
and are lower than the comparative average for the group of similar councils (25.3%), figures
remain above the national average of 20.7% which reflect approximately one in five children. 
% of children living in
poverty (after housing
costs) - North Lanarkshire
25.2 26.3 25.5 26.5 23.2 26.6 26.9 24.9
% of children living in
poverty (after housing
costs) - Scotland
20.6 20.7 20.2 21.7 19.8 21.6 21.8 20.7
Comparative average for
the group of similar
councils*
25.2 26.0 25.6 26.5 22.8 26.7 27.2 25.3 
The data in Figure 22a, which looks at poverty levels after housing costs, is not available at a
level below North Lanarkshire. 
Impact of delivering The Plan for North Lanarkshire
Reducing the proportion of children living in poverty delivers wide-ranging benefits - it improves
early health and reduces risks such as infant mortality, nutritional anaemia, and emergency
hospital admissions by ensuring families can afford the essentials that support healthy
development. Because poverty is strongly linked to poorer mental health, developmental delays,
and chronic illness across the life course, reducing child poverty strengthens children’s emotional
wellbeing and long-term health, while also boosting educational readiness and future economic
prospects through increased family income. 
Reducing the proportion of children living in poverty also reduces pressure on public services by
lowering the number of children entering care and decreasing the health-related demand that
stems from deprivation. 
Page 128 of 454

Page 129

Life expectancy at birth - estimates (c23) 
What this means
• This measure represents the average number of years that a person - from being a newborn
baby - is expected to live if they experience the area’s age-specific mortality rates for the given
time period. It reflects mortality among people living in the area, rather than those born there. 
Why this matters
• Tracking this information enables an assessment of whether life expectancy outcomes for
residents have improved over the lifetime of delivering The Plan for North Lanarkshire.
• Investment in a wide range of early intervention and prevention activities, alongside the
creation of healthy environments and the provision of personalised supports, helps influence
the social, environmental, and behavioural factors that shape long-term health outcomes for
residents. 
• Longer, healthier lives enable people to participate in education, work, and community life for
longer, boosting productivity and economic contribution across the life span. When life
expectancy is high and equitably distributed, it signals access to quality healthcare, decent
living conditions, and social wellbeing. 
Latest performance 
Males at birth 
Performance indicator 2015
-17
2016
-18
2017
-19
2018
-20
2019
-21
2020
-22
2021
-23
2022
-24
Average life expectancy at
birth for males - North
Lanarkshire
75.3 75.3 75.2 74.5 74.2 74.5 74.9 75.2
Average life expectancy at
birth for males - Scotland 77.0 77.1 77.2 76.8 76.6 76.5 76.8 77.2
Comparative average for
the group of similar
councils*
75.3 75.4 75.4 75.0 74.6 74.6 74.9 75.4 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
Females at birth 
Performance indicator 2015
-17
2016
-18
2017
-19
2018
-20
2019
-21
2020
-22
2021
-23
2022
-24
Average life expectancy at
birth for females - North
Lanarkshire
79.4 79.6 79.6 79.2 78.7 78.6 78.7 78.9
Average life expectancy at
birth for females - Scotland 81.1 81.1 81.1 80.9 80.8 80.7 80.8 81.1
Page 129 of 454

Page 130

Comparative average for
the group of similar
councils*
79.9 79.9 79.9 79.6 79.3 79.1 79.3 79.5 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
How North Lanarkshire has performed
Latest life expectancy estimates in North Lanarkshire show from a newborn age males are
expected to life to an average of 75.2 years and females an average of 78.9 years. 
For males at birth - this is an increase in life expectancy to 75.2 years following lower figures from
2018-20 to 2020-22 (which was at the time of the pandemic).
• The latest figures show that life expectancy for males at birth is now closer to the baseline
position of 75.3 years when The Plan for North Lanarkshire was established.
• Figures for Scotland overall show a similar increasing trend recently and life expectancy is
now an average of 77.2 nationally for males at birth.   
For females at birth - this is an increase in life expectancy to 78.9 years following slightly lower
figures from 2018-20 to 2020-22 (which was at the time of the pandemic).
• The latest figures show that life expectancy for females at birth has now almost returned to the
baseline position of 79.4 years when The Plan for North Lanarkshire was established.
• Figures for Scotland overall show a similar increasing trend recently and life expectancy is
now an average of 81.1 nationally for females at birth.   
The trend in life expectancy in North Lanarkshire is mirrored in the comparison with the average
life expectancy in the group of similar councils.  Although the latest position for North Lanarkshire
is slightly lower than this average by a few months. 
It should be noted that the calculations for life expectancy includes death registrations which
would have been impacted by the pandemic. It is expected that the latest figures for 2022-24 are
currently still being impacted in this respect, however national context reports state that it is
possible life expectancy will return to an improving trend in the future. 
Impact of delivering The Plan for North Lanarkshire
Life expectancy can be positively influenced by a wide range of factors, including: 
• Health behaviours - diet, physical activity, smoking, alcohol and drug use, and obesity all
influence overall mortality risk.
• Health care - access to quality primary and acute care, early diagnosis, emergency response,
and effective treatment reduce premature death.
• Biological and genetic factors - inherited diseases, family history, and gender differences affect
mortality rates.
• Social conditions - income, employment security, education, housing, and exposure to harm
affect the risk of early death.
Page 130 of 454

Page 131

• Local environment - air quality, pollution, and workplace safety risk of chronic illness or death.
• Mental health and wellbeing - access to support services, risk of suicide, stress, and long-term
conditions impact mortality. 
Healthy life expectancy at birth 
What this means
• This measure represents the average number of years that a person - from being a newborn
baby - is expected to live in a state of self-assessed good or very good health, based on the
current mortality rates of the area and prevalence of good or very good health.
• These figures are estimates of healthy life expectancy which are based on how people rate
their own health in the UK wide Annual Population Survey (APS). 
Why this matters
• Tracking this information adds a quality-of-life dimension to estimates of life expectancy.
Considering healthy life expectancy alongside life expectancy brings in aspects around health
and care and the importance of active and healthy lifestyles.
• Acting early reduces the accumulation of risk factors, prevents avoidable illness, delays the
onset of long-term conditions, and enables people to live independently for longer. Creating
healthy environments makes healthier choices easier for everyone, while personalised support
helps those with complex needs maintain independence and wellbeing.  Together, these
approaches improve quality of life, reduce avoidable and limiting illnesses and premature
death, and contribute to life expectancy - meaning more of North Lanarkshire’s residents
remain healthy for longer. 
Latest performance 
Males at birth 
Performance indicator 2015
-17
2016
-18
2017
-19
2018
-20
2019
-21
2020
-22
2021
-23
Average healthy life
expectancy at birth for
males - North Lanarkshire
58.9 58.1 58.1 56.5 55.5 55.1 53.2
Average healthy life
expectancy at birth for
males - Scotland
62.2 61.8 61.5 61.1 60.5 60.1 59.6
Comparative average for
the group of similar
councils*
59.3 59.0 58.8 58.1 57.3 56.9 55.9 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
Page 131 of 454

Page 132

Females at birth 
Performance indicator 2015
-17
2016
-18
2017
-19
2018
-20
2019
-21
2020
-22
2021
-23
Average healthy life
expectancy at birth for
females - North Lanarkshire
59.2 58.5 58.8 57.1 55.8 54.6 52.5
Average healthy life
expectancy at birth for
females - Scotland
62.8 62.4 62.2 62.2 61.5 60.5 60.0
Comparative average for
the group of similar
councils*
59.9 59.5 59.6 59.1 58.3 57.0 56.0 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
How North Lanarkshire has performed
Latest healthy life expectancy estimates in North Lanarkshire show from a newborn age males
are expected to life in a state of self-assessed good or very good health to an average of 53.2
years and females an average of 52.5 years. 
For males at birth - this is a decrease in healthy life expectancy to 53.2 years that has followed
the same trend in recent years. 
• Figures for Scotland overall show a similar decreasing trend albeit to a lesser extent, with
healthy life expectancy showing an average of 59.6 for males across Scotland. 
For females at birth - this is a decrease in healthy life expectancy to 52.5 years that has followed
the same trend in recent years albeit with a slightly greater dip in the recent figures compared to
males. 
• Figures for Scotland overall show a similar decreasing trend albeit to a lesser extent, with
healthy life expectancy showing an average of 60.0 for females across Scotland. 
The trend in healthy life expectancy in North Lanarkshire is mirrored in the comparison with the
average life expectancy in the group of similar councils.  Although the latest position for North
Lanarkshire is lower than this average for both males and females. 
Impact of delivering The Plan for North Lanarkshire
Healthy life expectancy can be positively influenced by a wide range of factors, including: 
• Health behaviours - balanced diet, regular activity, reduced smoking/alcohol/drug use, and
effective weight management help maintain good health for longer.
• Health care - preventive and primary care services, routine screening, and timely treatment
help avoid illness, disability, or long-term conditions.
• Biological and genetic factors - genetics influence susceptibility to long-term conditions and Page 132 of 454

Page 133

overall health status over the life course.
• Social conditions - secure income, quality employment, regular education, safe housing,
strong social networks, and reduced exposure to trauma support long-term good health.
• Local environment - clean air, access to green space, and environments that promote active
living support prolonged good health.
• Mental health and wellbeing - positive mental health, low stress, social connections, and
access to supports help maintain quality of life and functional ability across the life course.
Page 133 of 454

Page 134

Rating of health and care experiences in terms of independent
living, quality of life, and carers support (c24, c25, c26) 
What this means
• This measures how people who have responded to the national Health and Care Experience
survey rated their health and care experience in terms of independent living, quality of life, and
carers support. The survey responses include the following three measures:
- Independent living - % of adults supported at home who agreed they are supported to live
as independently as possible.
- Quality of life - % of adults supported at home who agree their services and support had an
impact on improving or maintaining their quality of life.
- Carers - total combined % of carers who feel supported to continue in their caring role.
• The Health and Care Experience survey is undertaken every two years.  It asks about people's
experiences (during the previous 12 months) of accessing and using their GP practice and
other local healthcare services, as well as receiving care, support, and help with everyday
living, and caring responsibilities.  
• The figures used in this analysis are based on a subset of the survey which includes only
those respondents whose care was funded by a council or health board. This may differ from
figures included in the national report, which includes all respondents regardless of how their
care is funded. 
Why this matters
Measuring these indicators shows how effectively local services are supporting people’s everyday
wellbeing, future resilience, and longer-term life chances.
• Measuring rates of independent living provides evidence on whether support enables people
with health or care needs to manage at home and retain autonomy. This helps reveal
strengths and gaps in provision, guides more targeted resource allocation, and acts as an
early warning for rising demand or avoidable long-term costs.
• Tracking quality-of-life indicators confirms whether services improve everyday experiences
rather than only addressing clinical needs. Without this evidence, it becomes difficult to
determine whether people are genuinely enabled to thrive or to direct interventions where they
will have the greatest benefit.
• Monitoring how supported unpaid carers feel provides an important gauge of system
resilience. This helps to identify burnout and associated health risks early, quantify pressures
on employment and household income, and inform timely action to prevent breakdowns in
care that would otherwise escalate system costs. 
Latest performance 
Independent living - % of adults supported at home who agreed that they are supported to live as independently
as possible 
Performance indicator 2018 2020 2022 2024
% of adults supported at home who agreed that
they are supported to live as independently as
possible - North Lanarkshire
75.4 77.6 79.8 67.7
% of adults supported at home who agreed that
they are supported to live as independently as
possible - Scotland
81.1 80.8 78.8 72.4
Comparative average for the group of similar
councils* 80.6 82.4 81.3 72.9 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
Page 134 of 454

Page 135

Quality of life - % of adults supported at home who agree their services and support had an impact on improving
or maintaining their quality of life 
Performance 2018 2020 2022 2024
% of adults supported at home who agree their
services and support had an impact on improving or
maintaining their quality of life - North Lanarkshire
75.6 75.7 77.0 67.7
% of adults supported at home who agree their
services and support had an impact on improving or
maintaining their quality of life - Scotland
80.0 80.0 78.1 69.8
Comparative average for the group of similar
councils* 78.3 81.1 78.9 69.4 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
Carers - % of carers who feel supported to continue in their caring role 
Performance 2018 2020 2022 2024
% of carers who feel supported to continue in
their caring role - North Lanarkshire 33.2 32.6 25.1 28.5
% of carers who feel supported to continue in
their caring role - Scotland 36.6 34.3 29.7 31.2
Comparative average for the group of similar
councils* 38.0 35.6 30.7 32.0 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire).
Page 135 of 454

Page 136

How North Lanarkshire has performed
107,538 (out of 526,758) individuals registered with a GP practice in Scotland responded to the
2024 national survey, an overall response rate of 20% - a decrease from 24% in the 2022 survey. 
The response rate in 2024 in North Lanarkshire was 18% (6,429 out of a sample of 36,443), a
decrease from 20% in the 2022 survey.   
Independent living - % of adults supported at home who agreed that they are supported to live as independently
as possible
• The results from the 2024 perception survey showed that 67.7% of people surveyed in North
Lanarkshire agreed they were supported to live independently. 
• The latest results show a decline compared to the previous survey in 2022 (79.8%) and are
lower than The Plan for North Lanarkshire baseline (75.4%). 
North Lanarkshire’s results over the years mirror the trends that can be seen in both the national
average and the comparative average for the group of similar councils. 
Figure 24a shows that North Lanarkshire’s latest results are lower than the comparative average
for the group of similar councils (72.9%), which is closer to the latest national average (72.4%). 
Quality of life - % of adults supported at home who agree their services and support had an impact on improving
or maintaining their quality of life
• The results from the 2024 perception survey showed that 67.7% of people surveyed in North
Lanarkshire agree that their services and supports improves or maintains their quality of life.
• The latest results show a decline compared to the previous survey in 2022 (77.0%) and are
lower than The Plan for North Lanarkshire baseline (75.6%). 
North Lanarkshire’s results over the years mirror the trends that can be seen in both the national
average and the comparative average for the group of similar councils. 
Figure 25a shows that North Lanarkshire’s latest results are lower than the comparative average
for the group of similar councils (69.4%), which is closer to the latest national average (69.8%). 
Carers - % of carers who feel supported to continue in their caring role
• The results from the 2024 perception survey showed that 28.5% of carers surveyed in North
Lanarkshire agreed that they feel supported to continue in their caring role.
• The latest results show an increase compared to the previous survey in 2022 (25.1%), but are
lower than The Plan for North Lanarkshire baseline (33.2%). 
North Lanarkshire’s results over the years mirror the trends that can be seen in both the national
average and the comparative average for the group of similar councils. 
Figure 26a shows North Lanarkshire’s latest results are lower than the comparative average for
the group of similar councils (32%), which is slightly above the latest national average (31.2%). Page 136 of 454

Page 137

Changes in the calculations nationally in 2018 for all three indicators mean the data before this
date is not necessarily directly comparable with the data for 2020, 2022, or 2024 so care should
be taken when assessment the trends. 
It is expected that the 2022 results will reflect, to some extent, individual perceptions that were
acquired during the pandemic, making comparisons with this particular year less able to be made
on a similar basis. 
Impact of delivering The Plan for North Lanarkshire
Improving these indicators would signal that more people are benefiting from support that
strengthens their independence, participation, and everyday stability.  
• Independent living - when more people live independently, they are able to maintain routines,
avoid unnecessary admissions, and stay active in family, work, and community life.  This
reduces pressure on formal services and supports longer social and economic contributions.
• Quality of life - when services genuinely improve people’s day-to-day experiences, they are
better able to stay in work, continue education, manage their homes, and take part in everyday
activities. This reduces absence from work, delays the need for higher-intensity support, and
strengthens social connectedness and financial stability.
• Carer support - when unpaid carers are well supported, households become more resilient,
financial security improves, and more carers can remain in work. This reduces disadvantage
for carers and supports a sustainable care system, with long-term benefits for wellbeing and
productivity. 
Page 137 of 454

Page 138

Employment in sustainable tourism - as a % of employment across
all six of the growth sectors (c27) 
What this means
• Sustainable tourism** is one of six sectors used to assess growth in employment in an area. 
The six sectors are food and drink, creative industries (including digital), energy, financial and
business services, life sciences, and sustainable tourism. 
• This indicator reflects the proportion of employment across the six sectors that is due to
sustainable tourism.   
**Sustainable tourism relates to hotels and similar accommodation, holiday and other short-stay accommodation, camping
grounds, and recreational vehicle parks and trailer parks. It includes restaurants and mobile food service activities, beverage
serving activities, tour operator activities, other reservation service and related activities.  It also includes museum activities,
operation of historical sites and buildings and similar visitor attractions, botanical and zoological gardens and nature reserve
activities, operation of sports facilities, other sports activities (not including activities of racehorse owners), as well as activities of
amusement parks and theme parks, and other amusement and recreation activities. 
Why this matters
• Tracking employment and activity within sustainable tourism is essential to understanding
whether the sector is genuinely contributing to long-term economic growth, rather than simply
increasing visitor numbers or generating short-term spending. By measuring the quality,
stability, and accessibility of tourism jobs, an assessment can be made of whether the benefits
of the sector are reaching local people and supporting a resilient, inclusive economy. 
• Understanding where the benefits of tourism employment are having an impact -  and where
gaps remain - helps to target policy, investment, and workforce development accordingly. 
Latest performance 
Performance indicator 2017 2018 2019 2020 2021 2022 2023 2024
Employment in sustainable
tourism as a % of
employment across all six
of the growth sectors -
North Lanarkshire
25.2 24.1 25.3 23.9 28.6 29.4 29.4 29.0
Employment in sustainable
tourism as a % of
employment across all six
of the growth sectors -
Scotland
28.8 28.7 30.0 26.6 27.1 30.0 31.7 31.9
Comparative average for
the group of similar
councils*
27.3 27.8 27.5 24.4 27.5 27.7 29.7 28.6 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
Page 138 of 454

Page 139

How North Lanarkshire has performed
Figure 27a reflects employment in North Lanarkshire in each of the six growth sectors.  This
shows that employment in sustainable tourism has remained the second highest growth sector in
North Lanarkshire over the reported data and performance has remained relatively stable. 
As shown in Figure 27b, employment in sustainable tourism sector in North Lanarkshire as a
proportion of employment in all six sectors combined has also remained at a relatively steady
level in recent years and the trend has generally followed the national average. 
• Figures for the latest growth rate in North Lanarkshire (Figure 27b) show a positive increase of
29% from the previous year (similar to an increase of 29.4% the previous year).
• Having performed above the national average previously, this is now lower that the latest
national average (31.9%).
• The latest results represent an increase from The Plan for North Lanarkshire baseline (25.2%
in 2017). 
The latest results for North Lanarkshire show a positive improving position that is similar to both
the national average and comparative average for the group of similar councils, albeit North
Lanarkshire’s position has shown a more stable picture in recent years.   
Figure 27b shows that at 29% North Lanarkshire is performing slightly above the comparative
average for the group of similar councils (28.6%). 
Employment in sustainable tourism remains high in North Lanarkshire due to a strategy that
grows the tourism offer, promotes local attractions, and supports businesses. This co-ordinated
approach sustains visitor numbers and underpins jobs across accommodation and hospitality. 
Financial and business services have long been a major growth sector, but employment has
declined as automation, digitalisation, and sector consolidation reduce the need for traditional
roles and shift specialised jobs to larger cities. Remote working and outsourcing have further
lowered demand for locally based positions, contributing to the drop in employment in this sector. 
Impact of delivering The Plan for North Lanarkshire
Increasing the share of employment in sustainable tourism is crucial to ensuring tourism growth
genuinely benefits local people. It supports the development of fair, secure, good-quality jobs,
broadens access to opportunities, and strengthens community resilience.
Page 139 of 454

Page 140

Gross Value Added (GVA) - growth per head in sustainable tourism
employment (c28) 
What this means
• Sustainable tourism** is one of six sectors used to assess growth in employment in an area. 
The six sectors are food and drink, creative industries (including digital), energy, financial and
business services, life sciences, and sustainable tourism. 
• This indicator reflects the Gross Value Added (GVA), i.e. economic value, generated by each
person employed in the sustainable tourism sector.   
**Sustainable tourism relates to hotels and similar accommodation, holiday and other short-stay accommodation, camping
grounds, and recreational vehicle parks and trailer parks. It includes restaurants and mobile food service activities, beverage
serving activities, tour operator activities, other reservation service and related activities.  It also includes museum activities,
operation of historical sites and buildings and similar visitor attractions, botanical and zoological gardens and nature reserve
activities, operation of sports facilities, other sports activities (not including activities of racehorse owners), as well as activities of
amusement parks and theme parks, and other amusement and recreation activities. 
Why this matters
• Measuring GVA per head in sustainable tourism indicates how much economic value the
sector generates per person, helping to show whether growth is genuinely boosting local
economic growth. 
• It shows whether tourism jobs and activity are contributing to higher-value employment, how
productive the sector is (the amount of economic output created per employee), how much
value tourism work contributes to the local economy, and whether jobs in the sector support
higher economic returns, rather than relying on low-value or seasonal activity. 
Latest performance 
Performance indicator 2016 2017 2018 2019 2020 2021 2022 2023
GVA per head in
sustainable tourism - North
Lanarkshire
£15,635 £19,239 £12,686 £14,461 £7,284 £13,772 £14,558 £13,469
GVA per head in
sustainable tourism -
Scotland
£19,086 £19,946 £19,404 £20,141 £13,516 £16,208 £21,532 £20,490
Comparative average for
the group of similar
councils*
£15,804 £18,119 £16,493 £19,256 £12,832 £13,698 £20,630 £14,849 
* Based on the eight councils containing the most deprived areas in Scotland (according to the Scottish Index of Multiple
Deprivation (SIMD), i.e. Dundee City, East Ayrshire, Glasgow City, Inverclyde, North Ayrshire, West Dunbartonshire, Western
Isles, and North Lanarkshire). 
Page 140 of 454

Page 141

How North Lanarkshire has performed
GVA (£) per head in sustainable tourism has fluctuated slightly in North Lanarkshire over the
period of the reported data and from The Plan for North Lanarkshire baseline (as depicted in
Figure 28a and also reflected in Figure 28b which shows the percentage year to year change in
GVA per head). 
• The effects of the pandemic can be seen in 2020 figures - with a 33% decrease in sustainable
tourism employment in the national average (and also the comparative figure for the group of
similar councils) compared to a 50% decrease in North Lanarkshire.  However, subsequent
years show recovery that has remained more stable.
• The latest results for 2023 show a small -7.5% decrease in North Lanarkshire following a
+5.7% increase the previous year.  This follows a significant 89% increase in 2021. 
• The latest results show a decline from The Plan for North Lanarkshire baseline in terms of the
GVA per head (£13,469 compared to £15,635).  But improvement in respect of the change
from the previous year as at the baseline (-7.5% compared to -14.4%). 
The latest results for North Lanarkshire in Figure 28a show a more stable position than both the
national average and comparative average for the group of similar councils, which both show
slightly more fluctuation from the previous year. 
Figure 28a shows that North Lanarkshire is performing below the comparative average for the
group of similar councils (£14,849), however there is a greater decline in the comparative
average (-28%) from the previous year compared to North Lanarkshire (-7.5%). 
It should be noted that the group of similar councils includes a number of cities, e.g. Glasgow and
Dundee. 
There is a time lag in the availability of these results with the most recent for 2023 being
published in December 2025. 
Impact of delivering The Plan for North Lanarkshire
Increasing GVA per head in sustainable tourism helps to boost local economic value - tourism
drives economic activity, income generation, and regional development, increasing overall
prosperity when value added per person rises. Sustainable and community-focused tourism
ensures that increased GVA is shared across income groups, supporting inclusive growth across
all communities. 
Page 141 of 454

Page 142

Page 142 of 454

Page 143

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref     FW/LS/SM Date 19/03/26 
Social Value Framework 
From  Fiona Whitaker, Chief Officer (People Resources)  
E-mail whittakerf@northlan.gov.uk  Telephone 07973 728628 
Executive Summary 
Delivery of commitments within the Plan for North Lanarkshire and our linked Programme
of Work continues to show strong improvements across a number of key indicators relating
to economic growth, investment, employment, and educational attainment. We know
however that our residents within North Lanarkshire still experience unacceptably high
levels of deprivation and poverty, and that clear areas of inequity and inequality remain
within our towns and communities. 
A key underpinning driver within our strategic plan is our ambition to ensure that all people
share equally in this improving picture, with a strong focus on delivering inclusive growth
and prosperity for all. This includes clear stated aims that any wider economic and social
benefits and opportunities which arise from the realisation of our plan, and the large-scale
regeneration and infrastructure projects which underpin it, must flow appropriately to our
young people, our residents and our communities. 
Within this context, and to better support this goal, this report brings forward a proposed
improvement in our approach to the realisation of community benefits aligned to all our
planned activities and future programmes through the establishment of a Social Value
Framework. The framework represents a significant evolution of the council’s commitment
to ensuring procurement spend delivers wider social, economic and environmental benefits
for local people, communities and businesses. This has been developed through a broad
cross cutting council piece of work, undertaken through the Brighter Futures programme
and focused on achieving both a consistent approach to social value across the council,
as well as ensuring that we maximise the benefits we can secure through our large-scale
procurement activity aligned to the delivery of our strategic plan. 
The Social Value Framework: Creating Local Impact with Lasting Change, is detailed in
appendix 1 and sets out North Lanarkshire Council’s renewed and strengthened approach
to embedding social value across procurement, partnership working and service delivery.
At the heart of the Framework, is delivery of The Plan for North Lanarkshire, ensuring that
public expenditure does more than secure goods and services – it actively contributes to
improving lives, tackling persistent inequalities, strengthening community resilience, and
building a fairer, more sustainable local economy. It responds to the needs of communities
across North Lanarkshire, including future jobs and apprenticeships for our young people;
opportunities for well-paid and secure employment and progression; funding for skills;
support for community improvements and educational attainment. 
Item 5
Page 143 of 454

Page 144

The Framework provides a clear vision and structured methodology for maximising social
value. It contains four core aims: 
1. Defining a clear, organisation-wide vision for social value aligned to the council’s
strategic priorities.
2. Embedding social value comprehensively within procurement and contract
management processes.
3. Establishing a transparent, data-driven approach to measuring, evaluating and
reporting social value.
4. Providing a phased roadmap for implementation that supports consistent practice
across all services, suppliers and partners. 
To achieve these aims, the Framework is aligned to Scotland’s Sustainable Procurement
Duty, Fair Work First, and Community Wealth Building principles and it formalises
requirements for social value delivery within procurement. Under our current
arrangements, for any Regulated Procurement with an estimated contract value of £4
million or above, the relevant Procuring Service Area is required to comply with the
Community Benefit Requirement. In addition, for contracts valued above £500,000, there
is an expectation that community benefits will be promoted in line with the council’s policy. 
To further increase and maximise opportunities to secure tangible outcomes aligned to our
Social Value Framework, and where proportionate, it is now proposed that procuring
Service Areas consider Social Value outcomes for all contracts valued at £50,000 and
above and apply a weighting for Social Value representing a minimum of 10% of the Quality
weighting. This is in line with known best practice in place elsewhere and established
through significant stakeholder engagement, including engagement with contractors. 
Additionally, it is proposed that the council should actively explore and encourage voluntary
social value opportunities across all contracts, where possible. The proposed 10%
weighting may also be increased to reflect contract value, particularly for larger contract
values. This support’s proportionate and meaningful social value contributions within
lower-value contracts, ensuring flexibility while maintaining strategic alignment. 
Delivery of the revised framework will be supported by comprehensive tools, including a
Social Value Toolkit, e-learning modules, and a structured menu of social value measures
aligned with the Open Access TOM System™. Procuring Service Areas will be supported
to identify, select, and monitor social value commitments that are proportionate to contract
size and type, evidence-based, and tailored to local needs. 
To ensure transparency, the council will publish an annual Social Value Insights Report,
combining quantitative outcomes with qualitative case studies to demonstrate the
real-world impact of social value activity across North Lanarkshire. This report will
complement the annual procurement report and enhance the council’s evidence base for
strategic planning, performance management, and continuous improvement. 
By adopting this Framework, North Lanarkshire Council will further strengthen its role as
an anchor institution, driving inclusive growth, enabling Community Wealth Building, and
supporting long-term improvements in employment, skills and community wellbeing. The
Framework ensures that social value becomes a standard, measurable, and meaningful
component of how the council invests in and delivers for local communities — creating
lasting change that aligns with the ambitions of a resilient, inclusive, and future-focused
North Lanarkshire. 
Page 144 of 454

Page 145

1. Background 
1.1 In previous reports to committee, reference has been made to the creation of a Social
Value Framework to enhance the return on procurement activity and support council
priorities linked to The Plan for North Lanarkshire. Whilst it is recognised the council is
committed to maximising social value, there is an opportunity to gain further value
through the contracts procured. 
1.2 The council’s Social Value Manager was appointed in late 2024 and sits within NL
Academies aligned to the Brighter Futures programme, with a specific focus on creating
an effective Social Value Framework and operating model (people and technology) to
maximise and fully leverage our outcomes. The post being based alongside NL
Academies is due to the intrinsic link from social value to the NL Academies model and
the wider Brighter Futures Programme of Work. This Programme of Work is focused
on building sustainable programmes to create opportunities with scale and impact
which is often difficult due to the instable funding environment which exists within
opportunities around apprenticeships, pathways development and skills training. 
1.3 The purpose of the Framework is to assist in driving consistency of approach in
managing and monitoring activities. It also encourages services to effectively utilise
procurement to achieve wider financial and non-financial outcomes when awarding
contracts. It strengthens and enhances opportunities in delivering benefit to our
communities and describes how we will embed social value principals into the
This report now sets out the council’s revised Social Value Framework for consideration
and approval by Elected Members. Next steps and a plan of work to further develop and
embed the Framework across the council is also included within the report. 
Recommendations
It is recommended that Policy and Strategy Committee: 
(1) Acknowledge the progress to date on the creation of a Social Value Framework to
materially increase value, deliver better outcomes and align monitoring, oversight
and reporting of social value. 
(2) Approve the council’s Social Value Framework: Creating Local Impact with Lasting
Change for implementation and embedding across all services. 
(3) Endorse the phased approach to implementation as set out within the report. 
(4) Endorse the requirement that Procuring Service Areas consider Social Value
outcomes in contracts £50,000 and above, and a minimum of 10% of the Quality
weighting. 
(5) Agree that a new Social Value Insights Report be presented to committee annually. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work All Programmes of Work
Page 145 of 454

Page 146

commissioning, procurement and contract management practices. The Framework
also details the reporting measures to ensure enhanced visibility of the social value
outcomes in a joined up and consistent way. 
1.4 The Procurement Strategy outlines the council’s general approach to incorporating
community benefit (social value) requirements and the link to Community Wealth
Building. The Social Value Framework has been designed to be aligned with both the
Procurement Strategy and Community Wealth Building principles. 
1.5 The council have seen significant successes in delivering social value within recent
largescale contracts, particularly through increased apprenticeship opportunities. The
aim of this Framework is to build upon existing areas of good practice i.e. Enterprise
Contracts, City Deal, Community Hub Programme, and New Supply (appendix 2
contains areas of current best practice in achieving social value). The Framework aims
to strengthen and drive consistency in our social value approach. 
2. Report 
2.1 The Social Value Framework is designed to support a consistent and transparent
approach to delivering benefits from procurement and a phased approach to
development is crucial to ensure the Framework is practical and aligned with
organisational priorities. The phased approach proposed is set out in diagram 1: 
Diagram 1 – proposed Social Value Framework implementation phases by year 
2.2 Initial activity in year 1 has focused on understanding current practice, reviewing
national guidance, and identifying opportunities for improvement. 
Year 1: Foundations, strategy and evidence gathering 
2.3 This phase focused on the council’s current approach to delivering benefits through
social value and using this to establish a clear evidence base to inform the development
of the Social Value Framework. This initial stage involved research, analysis and
engagement, designed to understand the organisation’s current position and identify
Page 146 of 454

Page 147

opportunities for improvement. Through engagement with internal and external
stakeholders and understanding community needs, this led to knowledge on
expectations, priorities, and perceived barriers. 
2.4 The findings from this phase highlight that there are opportunities for improvement
across strategic alignment, consistency in applying a social value methodology / menu
of items, and consistency and clarity in organisational wide monitoring and reporting. 
2.5 This phase also found many areas of good practice which already exist notably within
the New Supply team where an assigned officer collaborates across the council to
ensure value is driven through commitments made. The Enterprise Contracts, the
Connectivity Framework and the Town and Community Hub programme also represent
areas where the council is achieving added value. 
2.6 Notably, through our City Deal projects, community benefits can be incorporated into
council contracts on a contractual and / or a voluntary basis. A contractual approach
must be considered to target specific Community Benefit Outcomes for all contracts
over £50,000, where it is considered to be proportionate and relevant to the contract
being procured, and a voluntary approach must be considered to maximise the benefits
delivered from all contracts. 
Year 2: Framework development, piloting and integration 
2.7 Following the extensive engagement within phase 1, this shaped the approach to allow
the transition into the next phase of Framework development and allow us to build on
the successes to date. Currently, activity is focussed on year 2 actions. 
2.8 It is imperative that the Social Value Framework provides the golden thread across
procurement, contract management, and service delivery, The Plan for North
Lanarkshire, and the Programme of Work to foster fairer, sustainable, and resilient
communities through an aligned approach to support delivery on the council’s strategic
priorities. To support the delivery of the council’s social value approach, the Framework
offers a multi-layered governance structure to provide scrutiny and oversight for the
development and management throughout all social value activity.  
2.9 The Framework aims to enhance opportunities through five main areas: 
• Increase in local employment and equal opportunities
• Skills development and apprenticeships
• Diverse and resilient supply chains
• Community Wellbeing and Capacity building
• Climate Change and Net Zero (this is covered as part of the standard procurement
process). 
2.10 As part of pre-tender/early engagement within a procurement exercise, Procuring
Service Areas will be responsible for understanding local community
needs/demographics, which is the cornerstone of effective social value delivery within
North Lanarkshire Council. This includes: 
• Conducting market analysis and early supplier engagement
• Aligning to corporate priorities
• Aligning to Local Outcome Improvement Plans
• Examining newly developed Community Profiles (when implemented), and
• Linking to the Community Benefits Hub.
Page 147 of 454

Page 148

Procurement and Delivery 
2.11 The Framework proposes a structured methodology based on the Social Value Portal’s
TOMs (Themes, Outcomes, Measures) Open Access System. The TOMs framework
is widely recognised as an evidence-based structure that supports transparent,
consistent, measurable social value delivery. It is a comprehensive framework for
measuring social value and can be applied across various sectors and project types.
The framework also offers a standardised reporting template, reducing ambiguity and
ensure that both quantitative and qualitative data are captured in a consistent format. 
2.12 A key justification for the TOMs approach is that these measures are already
embedded within several of the councils existing contracts, mainly Enterprise Contracts
and Hub Delivery Programme (who use Scottish Futures Trust Measures derived from
TOMs). Using the TOMs Open Access System represents a natural progression, rather
than a shift in approach, building on existing practice and promoting continuity. 
2.13 For contracts exceeding £50,000, there is an expectation for Procuring Service Areas
to encourage social value outcomes, where it is relevant and proportionate to the type
of contract being procured. Procuring Service Areas are expected to be prescriptive,
on what social value outcomes are expected to be achieved. 
2.14 A minimum weighting of 10% will be applied to social value within the tender evaluation
criteria. Procuring Service Areas, supported by the Social Value Manager, will also be
expected to identify relevant measures that reflect community needs and strategic
priorities. Those outlined measures will then be formalised within contracts, with
suppliers required to submit both quantitative targets and qualitative delivery plans and
will fall within the contract management process. 
2.15 The proposals around weighting and contract value show evolution of our approach.
Under the current arrangements, for any Regulated Procurement with an estimated
contract value of £4 million or above, the relevant Procuring Service Area is required
to comply with the Community Benefit Requirement. In addition, for contracts valued
above £500,000, there is an expectation that community benefits will be promoted in
line with the Council’s policy. However, there has been limited evidence of consistent
application or visibility of community benefit promotion within contracts at this value
level. 
2.16 Similarly, disproportionate weightings are currently being applied within tenders, which
does not adequately recognise the scale of benefits that could be realised. This
approach has resulted in missed opportunities to maximise outcomes. Furthermore,
the use of very low weightings for community benefits limits the focus and ambition of
associated initiatives, potentially constraining the anticipated positive impact for
individuals and communities. 
2.17 The transition to the proposed weightings and contract values will strengthen the
council’s ability to direct social value contributions towards a coherent and consistently
applied set of strategic priorities. This approach is particularly pertinent given the
continued volatility in the external funding environment and the significant investment,
emerging pressures, and evolving workforce requirements across priority sectors. In
particular, the built environment and digital/AI industries are experiencing accelerated
demand for skills, driven by sustained levels of regional investment. Aligning social
value mechanisms with these priorities will support a more targeted and resilient
approach to delivering meaningful economic and employability outcomes. 
Page 148 of 454

Page 149

2.18 The proposed approach towards weightings and contract values combines methods
already in use, aligning established best practice across Enterprise Contracts, New
Supply, Housing Contract Strategy, and City Deal. Similarly, social value should be
incorporated into council contracts either on a contractual or voluntary basis. For
contracts over £50,000, relevant and proportionate Social Value outcomes should be
identified as part of the early engagement within the procurement process. To maximise
overall impact, the council should actively explore and encourage voluntary social value
opportunities across all contracts, where possible. Where a Procuring Service Area
determines that social value should not be included or a minimum weighting is not
appropriate, then the relevant Chief Officer should provide a reasonable justification
which must be documented. 
2.19 Should this Framework and corresponding weighting and contract values be approved,
an amendment to the Council’s Procurement Strategy (and relevant supporting
documents) will be required to ensure that the revisions are formally incorporated and
reflected within the governing framework. 
2.20 Robust contract management processes will be in place to monitor delivery, with
suppliers expected to report quarterly on their social value commitments. To strengthen
the council’s ability to monitor these commitments effectively, this will see the
introduction of a centralised monitoring system, coordinated by the Social Value
Manager, to ensure consistent tracking of supplier commitments across all service
areas. 
2.21 The monitoring system will include monitoring templates and tools for use by Procuring
Service Areas. It is proposed that these templates will be made available on to PowerBI,
with the system consolidating reports (frequency of reporting to be confirmed), to
enable visibility of progress against agreed social value measures and outcomes, and
community need. To further support transparency and accountability, it is proposed that
an annual Social Value Insights Report be created for oversight and awareness at
committee and will be publicly available to demonstrate the broader impact of council
spending. It is anticipated that the Social Value Insights Report will showcase the
positive outcomes achieved and reinforce social value delivery. Through the integrated
approach and supported by appropriate communications, it will highlight that the council
are not only delivering essential services but also maximising its role in being a catalyst
for positive change across communities. 
Next Steps – Year 3 and 4 
2.22 Closing the period of internal and external engagement, the Framework will be ready
to progress to the next phase of incremental implementation. The development and
implementation of the Social Value Framework sets out a multi‑year/ phased approach
to embed social value across procurement activity, service delivery, and organisational
culture.   
2.23 It is proposed that we move into the next phase of development (from Year 2, naturally
transitioning into Year 3), which will see the Framework formally adopted,
operationalised across services, resources aligned, and embedded through
procurement, contract management, and governance structures. 
Implementation across procurement and contract management 
2.24 Social value outcomes, where applicable within a project, will be incorporated into
planning, specification development, tender questions, evaluation criteria, and contract
Page 149 of 454

Page 150

award processes, supported by a Social Value Toolkit which will provide consistent
guidance to Procuring Service Areas. 
2.25 Various tools and guidance will be deployed as part of the implementation phases
including social value methodology and contract monitoring templates, guidance
materials i.e. a Social Value toolkit, and access to a Social Value Essentials e‑learning
module for Procuring Service Areas. 
2.26 Monitoring and reporting systems will be implemented, offering standardised contract
monitoring templates, a council‑wide social value organisational tracker, and Power BI
reporting dashboards will also be implemented to support transparency and
accountability. It is anticipated that a centralised shared area will be created to gather
evidence required through ongoing monitoring of social value commitments. 
Oversight, assurance, and continuous improvement 
2.27 The Social Value Governance Group will support the delivery of social value
commitments, reinforce consistent implementation, and coordinate activity across their
teams/service areas. 
2.28 Procuring Service Areas will assess supplier reports (frequency to be determined
based on type and duration of contract) and provide evidence of social value delivery.
Where non‑compliance is identified, appropriate remedies, including improvement
plans or penalties, may be applied. 
2.29 Where social value contributions cannot be delivered directly, or there is failure to
deliver, suppliers may provide financial contributions to the Social Value Innovation
Fund, supporting both strategic and community‑focused initiatives. Further consultation
during implementation will help refine the financial model and ensure proportionality
across contract types. 
2.30 When the Framework and guidance is implemented, an annual Social Value Insights
Report will be produced, setting out achievements, data insights, impact and outcomes
delivered through council contracts and activities. 
2.31 The Framework will be reviewed annually (or as required based on updates to national
policy / guidance or legislation) to ensure continued alignment with strategic priorities,
legislation, and best practice for continuous improvement. 
Risk and mitigation 
2.32 The main risks relate to organisational capacity, supplier readiness, and the potential
for over-commitment by bidders. Initially, these risks will be mitigated through clear
guidance, robust evaluation criteria, assessment of support required within services,
structured monitoring, and early engagement with suppliers, with the governance
arrangements providing further assurance and oversight. 
3. Measures of Success 
3.1 Performance measures will be developed as part of the Brighter Futures Delivery
Framework, which is linked to the council’s Strategic Performance Framework and will
ensure regular monitoring and measurement of success. 
3.2 Suppliers could show a deeper understanding of North Lanarkshire’s local needs,
resulting in more tailored and meaningful social value proposals. 
Page 150 of 454

Page 151

3.3 Social value outcomes identified, and commitments delivered by suppliers are viewed
as meaningful, relevant, and sustainable, with case studies demonstrating deeper,
long‑term impacts rather than purely transactional outputs. 
3.4 Communities should feel more connected to the council through social value activity,
with beneficiaries and local organisations sharing positive experiences as outcomes
reflect community needs, enhancing trust and visibility of council‑supported initiatives. 
3.5 The requirement from Procuring Service Areas on reporting and monitoring becomes
more simplified with the tools and templates made available, making it easier to embed
social value in procurement processes. 
3.6 Social value activity increasingly aligns with The Plan for North Lanarkshire,
Programme of Work, and Community Wealth Building priorities, meaning that service
areas evidence social value activity links locally identified needs. 
4 Supporting documentation 
4.1 Appendix 1 - Social Value Framework: Creating Local Impact with Lasting Change. 
4.2 Appendix 2 - Evidence of areas of best practice in delivering social value. 
Fiona Whittaker
Chief Officer (People Resources) 
Page 151 of 454

Page 152

5. Impacts
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
There are no current direct financial impacts. However, as the Council progresses
with Social Value Framework it is hoped that future procurements will generate
additional income, cost avoidance or benefit in kind opportunities for the Council
which will be tracked as outlined in the framework
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Legal advice has been obtained to ensure the proposals are in compliance with
procurement legislation and will be reflected within the council's GCSOs.
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐
Page 152 of 454

Page 153

If Yes, please provide a brief summary of the impact?
Power BI for reporting purposes is proposed to support the management and
monitoring of social value outcomes and outputs. Further requirements will be
developed in conjunction with the Finance and Technology team as implementation
progresses. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Communications will be required to support the implementation and roll out of the
Framework and in sharing case studies / the impact of social value.
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 153 of 454

Page 154

Delivering Social Value in North Lanarkshire
Social Value Framework
Creating local impact with lasting
change
Appendix 1
Page 154 of 454

Page 155

Delivering Social Value in North Lanarkshire  
Document control
Title  Social Value Framework - Creating local impact with lasting change
Owner(s) Fiona Whittaker
Lynsey Smith
Contact  Whittakerf@northlan.gov.uk 
Smithlyns@northlan.gov.uk 
Governance Group TBC
Author Stacy Muir Contact  Muirst@northlan.gov.uk 
Revision History
Number Originator Date Review Commenced Revision description/record of change             
Document Approvals
Number Governance
Group
Date approval granted Date approval to be requested 
(if document still draft)             
Consultation Record (for most recent update)
Status of document consulted upon 
Stakeholders consulted/date 
Strategic Alignment
All Priorities 
Next review date
Review Date 
Page 155 of 454

Page 156

Delivering Social Value in North Lanarkshire  3
Foreword 
At North Lanarkshire Council, we believe public services should do more than meet immediate
needs, they should create lasting value that uplifts lives, strengthens neighbourhoods, and
builds a more inclusive future. The Social Value framework, Creating local impact with lasting
change, sets out our renewed commitment to placing Social Value at the core of everything
we do.
As we look to the future, we are proud to present a framework that reflects our ambition to
move beyond traditional service delivery. It is a blueprint for how we will work collaboratively,
with partners, suppliers, and communities, to ensure that every pound spent contributes to
broader economic, social, and environmental wellbeing.
Whether it's supporting local employment, enhancing skills, promoting sustainability, or
fostering community resilience, this framework is about making a real and measurable
difference where it matters most.
The journey ahead is full of opportunity. By aligning our procurement, planning, and
partnership strategies with the principles of Social Value, we are not only responding to
national policy and legislative drivers, but we are also leading the way in demonstrating what
meaningful impact looks like at a local level.
We invite all stakeholders, internal teams, external partners, and the people of North
Lanarkshire, to engage with this framework, champion its goals, and help us deliver a legacy
of positive change. Together, we can ensure North Lanarkshire is a place where everyone
can live, learn, work, invest, and visit with pride and purpose. 
[Name/Title Placeholder]
On behalf of North Lanarkshire Council
Page 156 of 454

Page 157

Delivering Social Value in North Lanarkshire  4
Contents
1. What is Social Value? .................................................................................................. 5
2. Social Value Approach ................................................................................................. 6
3. Social Value Vision ...................................................................................................... 7
4. Purpose of this framework ........................................................................................... 8
5. Linking North Lanarkshire Vision to Social Value ......................................................... 9
6. Delivering Social Value success ................................................................................ 11
7. Procurement requirements for achieving Social Value ............................................... 12
8. Embedding Our Approach .......................................................................................... 13
9. Ensuring the success of Social Value ........................................................................ 14 
9.1 Integrating Social Value within Procurement ........................................................ 14
9.1.1 Planning ............................................................................................................ 14
9.1.2 Design ............................................................................................................... 15
9.1.3 Tendering .......................................................................................................... 15
9.1.4 Evaluation ......................................................................................................... 15
9.1.5 Contract Award ................................................................................................. 15
9.1.6 Contract Management ....................................................................................... 15 
9.2 Governance and Reporting .................................................................................. 16
9.2.1 Governance ...................................................................................................... 16
9.2.2 Reporting .......................................................................................................... 17
Appendix 1 - Social Value Methodology .............................................................................. 18 
Page 157 of 454

Page 158

Delivering Social Value in North Lanarkshire  5
1. What is Social Value? 
Social Value incorporates three key dimensions, Social, Economic, and Environmental, that
guide how North Lanarkshire Council can deliver on its Sustainable Procurement Duty. This
means thinking beyond cost, before any regulated procurement, how contracting can enhance
the economic, social, and environmental wellbeing of North Lanarkshire, reduce inequality,
involve SMEs, third sector and supported businesses, promote innovation, and embed Fair
Work First practices.  This is shown in Figure 1 below. 
Figure 1: Social Value Dimensions aligned to Scotland’s sustainable procurement duty
Embedding Social Value within procurement improves lives and strengthens local resilience
alongside Community Wealth Building, keeping resources circulating in North Lanarkshire. By
integrating these principles into both procurement and operations, aiming to deliver innovative,
compliant solutions aligned with Scotland’s Sustainable Procurement Duty, the council are
actively reshaping the local economy to build a fairer, healthier, and more inclusive economy
by: 
• Improving social, economic, and environmental wellbeing
• Enabling SMEs, third sector, and supported businesses
• Promoting innovation
• Embedding Fair Work First commitments 
Social Economic Environment
• Equality, diversity, and
inclusion
• Community
Empowerment initiatives
• Health and wellbeing
initiatives 
• Local employment
opportunities
• Supporting local supply
chain and SME’s
• Skills and training
opportunities
• Sustainability and net-zero
targets
• Climate resilience and
biodiversity 
• Circular economy
initiatives 
Page 158 of 454

Page 159

Delivering Social Value in North Lanarkshire  6
2. Social Value Approach 
North Lanarkshire Council is striving for collaboration and commitment to inclusive growth and
prosperity, making North Lanarkshire a vibrant place to Live, Learn, Work, Invest, and Visit. 
The Plan for North Lanarkshire sets out five key priorities: 
• Improve economic opportunities and outcomes. 
• Support all children and young people to realise their full potential. 
• Improve the health and wellbeing of our communities. 
• Enhance participation, capacity and empowerment across our communities. 
• Improve North Lanarkshire’s resource base. 
Following extensive internal and external engagement, the council has established a clear
Social Value approach that underpins its strategic priorities.  Social Value is a key driver in
achieving these priorities and supporting the successful delivery of The Plan for North
Lanarkshire. Through this phased approach, the council are championing a people-centred
approach to local development that retains wealth within communities by working
collaboratively with local anchor organisations and businesses to: 
Work Encourage local employment opportunities to keep economic value within
North Lanarkshire and reduce unemployment and economic inactivity.
Create equal opportunities to remove barriers to work and support inclusive
growth for under-represented groups.
Develop skills and experience to improve employability, support good work
and strengthen the future local workforce.
Economy Build a diverse and sustainable supply chain to strengthen resilience and
increase participation from SMEs, third sector and local businesses.
Promote resilient and inclusive businesses to support long-term economic
stability and community wealth building.
Community Support resilient communities by strengthening local capacity, skills and
networks.
Improve community wellbeing by ensuring procurement contributes positively
to health, inclusion and social connection.
Environment Restore the climate and improve air quality to protect public health and
support climate targets.
Promote environmentally sustainable procurement to reduce waste,
emissions and whole-life environmental impact.
Protect and restore biodiversity to support healthy ecosystems and climate
resilience.
Encourage a transition to a regenerative economy that delivers
environmental, social and economic benefits over the long term.
Page 159 of 454

Page 160

Delivering Social Value in North Lanarkshire  7
Key supporting policies:
The Plan for North Lanarkshire Community Wealth Building Statement
Procurement Strategy Environment Pathway
Tackling Poverty Economic Regeneration Delivery Plan
Equality Strategy 
3. Social Value Vision 
North Lanarkshire Council is unique in its commitment to delivering transformative change in
Scotland.  For many years, the council has been recognised as a leading local authority.  The
Plan for North Lanarkshire sets out an ambitious strategic vision focused on inclusive growth
and prosperity for everyone across the area.  Its aim is to ensure that people and communities
throughout North Lanarkshire benefit equally, with a fairer distribution of wealth and
opportunity.
Social Value in Scotland is underpinned by legislation including the Public Services Reform
(Scotland) Act 2010, the Procurement Reform (Scotland) Act 2014 (which introduced the
Sustainable Procurement Duty), and the Community Empowerment (Scotland) Act 2015.
These ensure council procurement decisions promote economic, social, and environmental
wellbeing benefits to reduce inequality, encourage participation from SMEs and third sector
organisations, and supported businesses.
Social Value is currently embedded across both strategic decision-making and day-to-day
operations through equality and diversity considerations in service design, as well as current
partnerships with key anchor organisations, including NHS Lanarkshire, Police Scotland
Lanarkshire, and New College Lanarkshire.  Within procurement, Social Value is used as a
strategic lever for transformation, ensuring that public spending and our collaborative
partnerships generate measurable, long-lasting benefits for people, communities, and the
environment.
This framework, delivered through a phased approach, supports local employment, skills
development, and community-led initiatives, driving sustained improvements in equality,
wellbeing, sustainability, and economic resilience.  Aligned with the council’s strategic
objectives, it reflects a proactive, place-based commitment to building an inclusive, resilient,
and future-focused local economy 
Page 160 of 454

Page 161

Delivering Social Value in North Lanarkshire  8
4. Purpose of this framework
The framework guides our phased approach, with key milestones set out within figure 2 which
details the steps required to securing meaningful Social Value for residents and communities. 
It sets out clear goals and methodology, reinforcing our commitment to collaboration across
the council and with external partners to fully explore Social Value opportunities. By
embedding Social Value into everything we do, we aim to maximise impact, create thriving
communities, a growing economy, and an improved environment for all in North Lanarkshire.
Social Value can proactively tackle further issues through bold, innovative approaches in our
procurement process that ensures public spending delivers meaningful outcomes for
residents. 
Through targeted initiatives, the council is committed to lasting improvements that benefit local
people and places, making Social Value a cornerstone of economic and community
development. 
Figure 2: Visual Roadmap to framework implementation
Aims of the framework:
• Define our vision and goals for Social Value, and how they align with the council’s strategic
ambitions.
• Embed Social Value consistently into procurement and contract management processes
across all services, with a clear explanation of approach.
• Establish a transparent, consistent and robust methodology for monitoring, evaluating and
reporting Social Value outcomes.
• Implement the framework effectively, fostering strong support from colleagues, suppliers,
and partners. 
Policy conte t
ouncil vision
Social value vision
esearch
aseline assessment
pportunities
Stakeholder engagement
Identi y social value model
Dra t social value principles
Dra t  ramework structure
aseline            
utline strategic ob ectives
De ine principles  scope  and
governance.
Develop detailed  ramework
components re uirements
onitoring   reporting system setup
oolkit   guidance
ull operational Social  alue  ramework
pdated processes  templates  and
guidance
arly achievements to report
ull understanding o   ramework
lear assurance   accountability
ontinuous  eedback   engagement
oll out to all relevant procurements
rganisation wide adoption
Annual Social  alue  eport
lear evidence o  impact and
change                                           
e ine  ramework based on
learning
Deepen community wealth
building links
ontinue direct community
co design innovation pro ects
ptimised  community driven
ramework
ider inclusive economic
impacts
ature governance and
reporting
Page 161 of 454

Page 162

Delivering Social Value in North Lanarkshire  9
5. Linking North Lanarkshire Vision to
Social Value 
The Council are excelling in their transformation programmes, which are delivering significant
progress across the region, with major investment improving housing, digital infrastructure,
community hubs, transport links, and town centres, all aligned to the long-term vision of
inclusive growth and better outcomes for local people of North Lanarkshire1. 
Through the Brighter Futures programme, this further strengthens transformation by providing
coordinated support across employability, skills, curriculum pathways, volunteering, and
entrepreneurship, supporting thousands of residents, boosting business growth, and
improving key Health Check Indicators such as positive destinations, benefit dependency, and
local earnings2. 
Building on our current best practice, the council are committed to ensuring that public
expenditure delivers more than just services; we will build Social Value into the way we
procure goods, services and works. Using our local data, we ensure Social Value is focused
on where it is needed most, and we will request suppliers to contribute positively to our
communities whether through jobs, training, support for local groups, or activities that improve
wellbeing. 
1 Programme of Work achievement to date
2 Brighter Futures Progress Update 
Figure 3: Linking The Plan for North Lanarkshire to Social Value outcomes and the councils five key priority areas.
Page 162 of 454

Page 163

Delivering Social Value in North Lanarkshire  10
Improve economic
opportunities and
outcomes.
Support all children and
young people to realise
their full potential.
Improve the health and
wellbeing of our
communities
Enhance participation,
capacity and
empowerment across our
communities.
Improve North
Lanarkshire’s resource
base.
Why this matters in North Lanarkshire 
Aligning Social Value with strategic priorities in a structured and measurable way, we will
ensure that our efforts are targeted, impactful, and responsive to the challenges faced by our
communities. Further examples of this alignment are provided in figure 3 below: 
Figure 3 4: Illustration of aligning council priorities to Social Value measures
Focused Measures
-Targeted employment & apprenticeships
-Work experience placements
-Incentivise suppliers to provide funding for
Digital or food security projects in
high-poverty areas.
Child Poverty impacts 24.9% of
children in North Lanarkshire
Focused Measures
-Supported employment pathways for
council priority groups
-Upskilling for people re-entering the
labour market
-Promote local recruitment
-Support for Mental Health and
Wellbeing programmes
Economic Inactivity &
Long-Term Sickness (24.5%
inactive; 27,000 long-term sick)
Focused Measures
-Support ESOL initiatives
-Provide financial funding community
language groups within North Lanarkshire
-Targeted employment
-Supported employment pathways
Diversifying population with
4.03% minority ethnic, with +85%
growth with some facing
employability barriers barriers
Focused Measures
-Employer-led projects targeted at
females
-Career inspired sessions
-Youth employability pathways and
work experience
-Work experience placements for pupils
-Support for ASN and care-experienced
young people
Educational Attainment Gap, with
SIMD20 pupils achieving SCQF
Level 6 sitting at 23%, compared
to 35% overall.  Girls’ STEM
participation declining, and 200
pupils annually leave school
without a positive destination.
Page 163 of 454

Page 164

Delivering Social Value in North Lanarkshire  11
6. Delivering Social Value success
Scope
Under the Procurement Reform (Scotland) Act 2014, the council has a statutory duty to
consider including community benefit requirements for all regulated procurements valued at
£4,000,000 or above, which is essential to achieving Socio-Economic benefits from our
e ternal e penditure and  orm part o  the council’s Sustainable Procurement Duty. 
As part of council regulated procurements, First Work First and Environmental are standard
considerations.  In addition to core requirements, consideration must be given to Social Value
outcomes to ensure that Socio-Economic benefits are explicitly addressed. 
To further maximise opportunities to secure tangible outcomes aligned to our Social Value
Methodology (see Appendix 1), and where proportionate, it is proposed that procuring
Service Areas consider Social Value outcomes in contracts £50,000 and above.  To maximise
overall impact, the council should actively explore and encourage voluntary social value
opportunities across all contracts, where possible. 
It is proposed that a weighting for Social Value should represent a minimum of 10% of the
Quality weighting.  This weighting may be increased to reflect contract value.   
Where the Procuring Service Area determines that Social Value outcomes are not achievable
or applying a minimum 10% weighting for Social Value is not appropriate, a clear and robust
justification from the designated Chief Officer must be documented. This rationale must be
formally recorded and retained on file to ensure transparency and accountability. 
Methodology
The Social Value methodology supports consistent, transparent, and rigorous evaluation and
reporting of supply chain commitments throughout the procurement and contract management
process.  This approach is designed to capture Social Value activities that are locally relevant
and deliver meaningful, long-term benefits to the residents, communities, economy, and
environment of North Lanarkshire. 
The council’s methodology incorporates measures  rom the Social  alue Portal’s  pen
Access TOM System™ to assess Social Value outcomes in both financial and non-financial
metrics, with all measures aligned with best practice and directly supporting the vision and
strategic objectives outlined in The Plan for North Lanarkshire.   
This structured methodology minimises ambiguity in target setting, facilitates effective
performance management, and establishes a clear framework for continuous improvement. 
On a case-by-case basis, officers will select measures from our Social Value Framework
which are most applicable to the goods, works or services being procured, and the needs of
North Lanarkshire community.
Page 164 of 454

Page 165

Delivering Social Value in North Lanarkshire  12
7. Procurement requirements for
achieving Social Value 
In collaboration with the Social Value Manager and the Brighter Futures Team, Procuring
Service Areas should identify potential Social Value outcomes most relevant to their
procurement, based on the specific needs of the service and/or the local community. 
To support this, the Social Value toolkit, provides guidance and resources to assist Procuring
Service Areas to incorporate Social Value into their procurement activities.  The toolkit ensures
that Procuring Service Areas select appropriate and proportionate measures, which are
grounded in robust, data-driven evidence. An e-learning module, Social Value Essentials, has
been designed to help overcome common hurdles and understand key concepts, and is
available on LearnNL for all Procuring Service Areas. 
Procuring Service Areas should develop a tailored menu of relevant Social Value measures.
While indicative thresholds can be used as a guide to support proportionate decision-making,
the focus should be on selecting measures that are meaningful, relevant and appropriate to
the contract and community. Table 1 provides an illustrative example only and should not be
treated as a prescriptive or numerical requirement. 
Table 1: Illustration of menu of measures and thresholds 
• Quantitative Submission: numerical Social Value targets against selected measures.
• Qualitative Submission: supporting method statements to describe the intention to
deliver each activity including an indicative timeline for the activities throughout contract
duration.
Proportionate to the scale of the procurement, bidders must submit a delivery plan that outlines
key details to support their Social Value proposal. This should include:
• A stakeholder engagement plan
• Leadership structure and resource allocation
• Monitoring and reporting
• Contingency arrangements to address potential risks or issues
• Plans for continuous improvement
Contract
value
Below
£50,000
Between
£50,000 -
£500,000
Between
£500,000 and
£1million
Between
£1million and
£30million 
Over £30
million
Approximate
number of
measures
Measures are
voluntary
should be
proportionate
to type/or
value of
contract
1 – 5
measures
5 – 10
measures
10 – 15
measures
Full suite of
measures
Page 165 of 454

Page 166

Delivering Social Value in North Lanarkshire  13
8. Embedding Our Approach
To ensure Social Value is meaningfully embedded at every stage of procurement and contract
delivery, Procuring Service Areas should adhere to the steps outlined below: 
1. Pipeline Understand Serivce
and Local Priorities
Stakeholder
Engagement
Pre-market
Engagement
2. Plan Prepare
Specification
Embed Social Value
Measures Set Award Criteria
3. Evaluate
Assess Quantitative
submissions against
TOM System
Assess Qualitative
submissions 
including Social
Value Delivery Plan
4. Contract
Award
Implement a
structured Contract
Management
process
Formalise Social
Value committments
5. Contract
Management
Monitor for
reporting
Performance
Management
Address non-
delivery
6. Contract
Completion
Gather data and
feedback to inform
future direction
Page 166 of 454

Page 167

Delivering Social Value in North Lanarkshire  14
9. Ensuring the success of Social Value
While it is essential that suppliers deliver on their Social Value commitments, it is equally
important that council Procuring Service Areas actively support, monitor, and collaborate to
ensure these commitments are fulfilled in line with best practice.
To maintain transparency and accountability, guidance is provided within the Social Value
toolkit, with progress reported centrally to the Social Value Manager. This data will be captured
through a performance metric system and incorporated into a comprehensive Social Value
Insights report. The robustness of this process relies on effective monitoring and reporting by
Procuring Service Areas across service areas.
To support consistent and impactful delivery, the framework outlines the following key
elements:
• Agreed mechanisms for identifying and understanding local needs and priorities,
ensuring Social Value opportunities are aligned with community requirements.
• Clear methods for assessing and measuring Social Value throughout the
procurement lifecycle.
• Robust contract management to ensure commitments are delivered as agreed.
• Structured reporting to demonstrate Social Value, providing assurance to Elected
Members and the public.
By following this approach, we will continue to strengthen internal networks, build confidence
and capability in managing Social Value, and promote proactive engagement across services
and suppliers. This will ensure clarity around expectations and foster a culture of continuous
improvement.
9.1 Integrating Social Value within Procurement
9.1.1 Planning
Procuring Service Areas should explore and understand local community needs and identify
Social Value opportunities that can align with either, or tailored to, their service area,
communities and/or type of contract.  Further guidance is outlined on the Social Value toolkit. 
Considerations should include but not be limited to: 
• Value and term of contract  • Type of contract
• Contribute financial support equivalent
to Social Value commitments to the
Social Value Innovation Fund. 
• Consider financial contribution where a
Social Value commitment cannot be
delivered and no suitable alternative
can be identified. 
• Alignment of procurement to Corporate
Priorities
• Market Analysis/Supplier early
engagement
Page 167 of 454

Page 168

Delivering Social Value in North Lanarkshire  15 
9.1.2 Design 
Procuring Service Areas should include their Social Value Methodology within their contract
strategy. 
The following points are required for inclusion:
• All information identified within Planning stage
• A menu outlining chosen Social Value Measures 
• Utilise the template Social Value question from the procurement toolkit. 
9.1.3 Tendering
At this point, the planning and design stage of the procurement process is complete.  Procuring
Service Areas and Procurement Representatives should issue tender documents and manage
submissions.  
9.1.4 Evaluation
Social Value commitments agreed will be assessed against the following criteria to ensure
that they are deliverable:
• Relevance: Are the commitments aligned with North Lanarkshire local priorities set
out?
• Specificity: Are they SMART (Specific, Measurable, Achievable, Realistic, Time-
bound)?
• Evidence: Past performance, case studies, and delivery plans.
• Monitoring: Clear systems for tracking and reporting outcomes.
9.1.5 Contract Award 
he success ul supplier’s Social Value proposals will be written into the formal contract award,
meaning that the commitments become deliverables.  Procuring Service Areas must adhere
to the council’s Contract and Supplier Management, and may also determine that it is
appropriate to include Key Performance Indicators (KPIs) and reporting obligations to track
delivery.
9.1.6 Contract Management
Suppliers will be expected to submit quarterly reports to their named council Procuring Service
Area, outlining their progress of Social Value commitments. Further guidance can be found
within the Social Value toolkit, including council standard contract monitoring templates.  
The progress may be discussed at contract progress meetings to ensure that delivery of Social
Value commitments against the relevant measures is monitored and reported on a regular
• Local Outcome Improvement Plans or
email:CommunityMatters@northlan.gov
.uk for further support. 
• North Lanarkshire Council Community
Benefits Hub for local community
requests.
Page 168 of 454

Page 169

Delivering Social Value in North Lanarkshire 16
basis, demonstrating best practice through contract management.  Suppliers may also be
expected to provide evidence of Social Value delivery.  Some examples are provided below:
• Employment records i.e. local employees hired
• Training records
• Community engagement logs
• Environmental plan.
In the event of non-compliance, the council may consider triggering:
• Contractual penalties
• Performance improvement plans
• Or in extreme cases, termination clauses.
9.2 Governance and Reporting
9.2.1 Governance 
o support the success ul implementation o  council’s Social Value Framework, a robust
governance structure has been identified to ensure Social Value is delivered effectively,
transparently, and in alignment with strategic objectives.  As accountability is clearly defined
across all levels of the organisation, the Social Value Governance Group will continue to drive
coordination and delivery of Social Value initiatives across projects and council operations,
with locally appointed Social Value Representatives embedded within each service area to
advocate and enable Social Value within their team, providing support and coordinated
decision-making throughout delivery of a contract.
Oversight of performance will be provided by the Social Value Manager.  Progress will be
reported and reflected annually within a newly created Social Value Impact report.
Oversight and transparency via the councils committee process is key in supporting the
governance process, ensuring elected members are informed and engaged throughout the
lifecycle of the framework.
The day-to-day delivery of this framework will be led by Procuring Service Areas within each
service area, who will be responsible for monitoring progress and reporting directly to the
Social Value Manager. Supporting a joined-up approach, Social Value Governance Group will
foster collaboration and ensure Social Value is embedded consistently throughout council
operations.
The framework will be reviewed annually after implementation, unless there us local or
national policy change, to ensure ongoing alignment with the council’s strategic priorities,
relevant legislation and best practice.
Page 169 of 454

Page 170

Delivering Social Value in North Lanarkshire  17 
9.2.2 Reporting
Our annual Social Value Insights report will be published to demonstrate the council’s ongoing
commitment to creating positive impacts within local communities through our Social Value
approach.  It will showcase the real-world benefits delivered through council activities, focusing
on areas such as employment, skills development, community wellbeing, and inclusion,
combining both quantitative data and qualitative case studies that show tangible outcomes for
local communities. 
By aligning with frameworks such as the Open Access TOM System™ and the Sustainable
Procurement Duty, the report evidence compliance with legislation while highlighting
continuous improvement and stakeholder engagement.  In addition, complimenting the
council’s annual procurement report  it will  urther strengthen the narrative on community
benefits, ensuring consistent metrics are used, and provides the Corporate Procurement
Team with insights that may help shape future strategies, enhance governance, and continue
to embed Social Value into procurement decisions to further opportunities and promote
sustainable, and inclusive service delivery.
Committee
Social Value Governance
Group
Social Value
Respresentatives
Brighter Futures TeamCorporate Procurement
TeamOperational Service Areas
Procuring Service Areas
Corporate Management
Team
Social Value Governance 
Page 170 of 454

Page 171

Delivering Social Value in North Lanarkshire 18
Appendix 1 - Social Value Methodology
Theme Outcome New
Ref Measure Units
W
ork
Creating local
employment
opportunities
NT1 Local people employed or retained no. people FTE
Creating
equal
employment
opportunities
NT3 Long-term unemployed people recruited no. people FTE
NT4
Employees recruited who are Not in
Education Employment or Training (16-24
y.o.)
no. people FTE
NT76 Unemployed people recruited no. people FTE
NT5 Unemployed ex-offenders aged 18 and over
recruited no. people FTE
NT6 Unemployed individuals with disabilities
recruited no. people FTE
Providing
skills and
experience for
good work
NT9 Accredited training for new employees no. weeks
NT10 Employment of new apprentices no. weeks
NT80 Upskilling of existing employees through
accredited training no. weeks
NT11 Personalised support to help unemployed
people into work
no. hrs (total
session
duration)*no.
attendees
Providing
good work
opportunities
NT12 Meaningful unpaid work placements while Not
in Employment Education or Training no. weeks
NT13 Meaningful paid work placements no. weeks
Developing
skills and
experience for
future work
NT8 Support for students at local educational
institutions
no. staff
volunteering hours
NT99 Support for enabling visits of school children
or local residents
no. staff
volunteering hours
Page 171 of 454

Page 172

Delivering Social Value in North Lanarkshire 19
Economy
Building
diverse and
sustainable
supply chains
NT14 Spend with VCSEs in the supply chain £
NT18 Spend with local companies in the supply
chain £
NT19 Spend with local SMEs in the supply chain £
Promoting a
diverse and
resilient
business
community
NT15 Expert support to VCSEs and SMEs no. staff expert
hours
NT16 Support for VCSEs through donations £ invested
NT17 Support for VCSEs through volunteering no. staff
volunteering hours
Community
Building
resilient
communities
NT28 Support for local community projects through
donations £ invested
NT29 Support for local community projects through
volunteering
no. staff
volunteering hours
Building
community
wellbeing
NT26 Support for community health or wellbeing
interventions
£ invested inc.
time, materials,
equipment etc
NT27 Support for initiatives focused on
strengthening community networks
£ invested inc.
time, materials,
equipment etc
Further information on the Open Access TOM System™ can be found here.
Page 172 of 454

Page 173

Housing and Corporate Maintenance and
Improvement Services
(£1.8bn)
• 51 new apprenticeships created across the contract
and supply chain.
• 91% of workforce locally based.
• Target exceeded for percentage of women hired on
the contract.
• Target exceeded for percentage of employees
(BAME) hired on the contract.
• Over £18 million spent through local supply chain.
• Over 2000 hours of voluntary time provided to local
groups and VCSE’s.
• 6 local projects financially supported through the
Mears Foundation.
Roads and Infrastructure Maintenance and
Improvement Services
(£450m)
• 5 apprenticeships created
• 1 Summer placement that led to Graduate
Apprenticeship.
• 64% of workforce locally based.
• 8% of women hired on the contract.
• 2% of employees (BAME) hired on the contract.
• Over £6.5m million spent through local supply
chain.
• 3 Armed Forced Veterans employed on contract.
• Connecting Communities programme: Total Value
in Round 1: £20,000.
Enterprise Contracts Appendix 2
Page 173 of 454

Page 174

School Street,
Coatbridge
(Live Project) (£26.8m)
•Five new employees recruited
so far.
•Two apprentices recruited.
•Nine work experience
placements for
Graduate/Foundation
Apprenticeship committed.
•Eight work experience
placements committed.
•Three career events
committed.
•Four site visits committed.
•Onepaid summer placement
fulfilled.
•Two mini career events
committed.
•Two supply chain briefings
fulfilled.
•Financial support for six
community projects.
•Non-financial support for
three community projects
committed.
Plains, Airdrie
(£3m)
•Four apprentices
recruited.
•Two career
eventsdelivered
across NL.
•Two site visits
completed.
•Support for two
community
projects
committed but
three delivered
in total.
Community Road,
Bellshill
(£5.96m)
•One committed
but two new
employees
recruited.
•Onecommitted
but three
apprentices
recruited.
•OneQuantity
Surveyor
recruited.
•Two career
events delivered
to school pupils
across NL.
•£3000 donatedto
community
organisation.
Waterloo, Wishaw
(£3.57m)
•Two committed
but six new
employees
recruited.
•Zeroapprentices
committed but
fourrecruited.
•Six work
experience
placements
fulfilled.
•Six construction
curriculum
supportfulfilled.
•£300 donatedto
support a
community
project.
•Non-financial
support fulfilled
for two
community
projects.
Old Town Hall,
Motherwell (Live
Project)
(£6.5m)
•Three new
employees
recruited (one
from priority
group).
•One mentoring
programme
fulfilled.
•Twocareer events
committed, with
one fulfilled.
•OneSupply Chain
briefing fulfilled.
•Financial support
for community
organisation
fulfilled.
•Non-financial
support for
community
organisation
fulfilled.
Thorn Road,
Bellshill (Live
Project)
(£6.1m)
•Three new
employees
recruited (from
priority group)
•Three
apprentices
recruited(from
priority group)
•Fivework
experience
placements
fulfilled.
•Elevencareers
eventsfulfilled.
•Mini careers
event fulfilled
(P6/P7).
New Supply
Page 174 of 454

Page 175

Housing Contract Strategy
Independent Audit
of Gas Services
(£180,000)
•Provided 10 SMEs
access to their
licenced system to
complete a 1-hour
course on Fire Safety,
Asbestos, Gas /
Electrical Safety and
Damp / Mould.
• Onenew employee
recruited, via Routes
to Work, leading to
Level 2 Certificate in
their field of work.
Tower Demolition
(Coatbridge) (£4.9m)
•Three new employees
recruited (of which, were
refugees living local to
demolition site).
•Twoemployed from priority
groups.
•Voluntary works at carried
out at local nursery to the
value of £600.
•Donationof 50 selection
boxes
•Donation of100 easter eggs
& 3 boxes of milky bars to
local Community Group.
• Careers Event at local
secondary school, which
included presentation on
demolitions and Health &
Safety, including a simulator
for students to experience
the operation of heavy
machinery and giveaway
merchandise.
Refurbishment of
Retirement Housing
(£1.49m)
•Twowork experience
Placements 
provided to 14–16-
year-old.
•One employee
recruited from
prioritygroup.
• Delivered Career
Events at local
secondary school.
Tower Demolition
(Motherwell)
(£5.69m)
•One new apprentice
employed and
working towards
Level 2 Demolition
Operative Certificate.
•Twocareer sessions
deliveredto S4-S6 at
local secondary for a
career in demolition,
•Participated in a
Careers Event, via
DYW Lanarkshire –
Step into STEM –
Employer’s Partners
Career Event.
•Provided provision to
the “Drop in Centre”
for residents during
demolition.
Gas Installations
(£24m)
•One new apprentice
employed.
•Two work experience
placements fulfilled.
•Twocareer events
fulfilled.
•Over £4,000 donated
to support local
people and
community
organisations
Page 175 of 454

Page 176

Hub Delivery Programme
Orbiston Community Hub
(£43m)
• Six employment placements
committed for duration of
contract with eleven
achieved.
• Eight NEETs placements
committedbut 11 achieved.
• Thirty-two hours committed
to Graduate employment but
103achieved.
• Twenty-Five hours
committed to support young
people to work but sixty-six
hours delivered.
• Twenty hours committedto
meaningful work placements,
with one hundred and fifty-
four delivered.
• £3m committedto local
supply chain but over £5m
delivered.
• £500committed community
to a local community project
but £3,837 fulfilled.
St Kevins Community Hub
(£17.5m)
• Ten employment placements
committed for duration of
contract, with thirty-three
achieved.
• Two NEETs placements
committedwith four
achieved.
• Seven hundred and sixty-
seven hours fulfilled in
dedicating to young people to
support into work.
• Thirty-two hours committed
to paid work
placement/internship, but
forty hours fulfilled.
• Over £3m spent within the
local supply chain.
• Over £2m spent supporting
SMEs.
• £27,075 spent on supporting
local community projects.
Chryston HS Extension
(£39.5m)
• Eight employment
placements committed, with
two achieved so far.
• Two NEETs placements
committedand fulfilled.
• One hundred and twenty
hours fulfilled in dedicating
to young people to support
into work.
• Seven hours fulfilledon paid
work placement/internship
achieved.
• £28,557 spent within the
local supply chain. 
• £4,000committed on
supporting local community
projects.
Gartcosh Community Hub
(£33m)
• Seven employment
placements committed with
four achieved so far.
• Seventy hours committed to
supporting Graduate
Employment, with one
hundred and one hours
delivered.
• Thirty weeks of paid work
experience
placements/internship
achieved.
• Over £17m spent on local
supply chain.
• Over £15m spent supporting
SMEs
• £4,000 committedto
supporting local community
projects.
Page 176 of 454

Page 177

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    PH/SD/LGF Date 19/03/26 
UK Government Local Growth Funding 
From  Pamela Humpries, Chief Officer (Place)  
E-mail douglass@northlan.gov.uk Telephone Sharon Douglas
07970 489136  
Executive Summary 
The purpose of the paper is to provide an update on the UK Government’s Local Growth
Fund which commences from 1 April 2026.  The funding allocated to the Local Growth
Fund is a reduction in relation to what was previously available for similar activities and
projects through the UK Shared Prosperity Fund.  This is compounded by a higher
proportion of funding being allocated to capital investment and the requirement to move to
regional interventions. The reduced funding available for North Lanarkshire and the impact
on the activities currently funded through the UKSPF Programme are set out in section 2
of this report, with particular reference to the impact in staffing. 
North Lanarkshire has also been allocated a second funding stream, the Pride in Place
Impact Fund, as part of the UK Government’s proposals for long term local growth funding
to support regional growth across the UK for the next 3-year period. Proposals for the
allocation of the Impact Fund are also presented in this report.  
Recommendations
It is recommended that Policy and Strategy Committee: 
(1) notes the allocation of Local Growth Funding of £60.9m to Glasgow City Region for
the period 2026/27 – 2028/29 
(2) notes the potential allocation of £1,414,500 revenue funding from the Local Growth
Fund to North Lanarkshire Council in 2026/27 
(3) acknowledges the impact the reduction in funding will have on staff and services and
the actions being taken to minimise this 
(4) approves the proposed allocations to volunteering, business support and
employability and skills as set out in paragraph 2.1.15 
(5) endorses the proposed allocations for the Pride in Place Impact Fund as set out in
section 2.2 
Item 6
Page 177 of 454

Page 178

1. Background 
1.1 At the Spending Review in June 2025, the UK Government presented high level
proposals for long term local growth funding to support regional growth across the UK
for the next 3-year period, replacing the UK Shared Prosperity Fund (UKSPF) and
Levelling Up programmes. It was confirmed that as part of the approach, Scotland
would receive the same overall level of funding in cash terms as was provided through
the UKSPF programme in 2025/26, amounting to £228m over 3 years (2026/27 –
2028/29). It has subsequently been confirmed that the funding will be distributed
through 4 programmes: Pride in Place, Pride in Place Impact Fund, Local Growth Fund
and the Growth Mission Fund. 
1.2 In September 2025, further information was provided on the Pride in Place and Pride
in Place Impact funding, with North Lanarkshire receiving an allocation from both
programmes. In December 2025 it was confirmed that ‘Forgewood, North Motherwell
and Town Centre’ would be the phase 2 Pride in Place neighbourhood, receiving up to
£20m over 10 years. Work is underway to appoint a Chair and establish a
Neighbourhood Board for that programme.  Coatbridge is one of the 10 towns within
the Pride in Place Phase 1 programme and will also receive funding of up to £20m over
a 10 year period.   
1.3 During November 2025 the UK Government met with stakeholders across Scotland to
consult on the balance of funding that remained after the Pride in Place and Pride in
Place Impact Fund awards, confirming it would be distributed through the Growth
Mission Fund and the Local Growth Fund. The Autumn Budget on 28 November 2025
made initial allocations from the Growth Mission Fund to Inverclyde and Fife. 
1.4 Further information on the Local Growth Fund was not provided until 8 January 2026.
It was confirmed that £140 million would be made available through the Scottish Local
Growth Fund for the period April 2026 to March 2029, and that it would be allocated to
5 eligible Regional Economic Partnerships in Scotland as follows: 
Regional Economic Partnership (REP) 2026 - 2029 Allocation
Ayrshire £11.8 m
Edinburgh and South East £37.8 m
Forth Valley £9.8 m
Glasgow City Region £60.9 m
Tay Cities £19.5 m
TOTAL £140 m 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work All Programmes of Work
Page 178 of 454

Page 179

1.5 The allocation methodology was guided by a set of core principles: 
• Strategic Objectives: The Local Growth Fund supports the UK Government’s
Growth Mission to improve living standards for working people by investing in the
regions that contain the areas with the lowest Real Disposable Household Income
(RDHI) per capita. It will provide strategic flexible funding for investment to drive
economic growth, with details on investment themes and interventions to be set
out in due course.
• Geographic levels and institutions: Funding is delivered through the highest level
of local governance to enable strategic decision-making across interconnected
ecosystems of firms, institutions, supply chains, and labour markets. Regional
Economic Partnerships (REPs) are collaborations between local government, the
private sector, education and skills providers, enterprise and skills agencies and
the third sector to deliver economic prosperity across Scotland’s regions. REPs are
used to reflect functional economic areas (FEAs) with sufficient scale to support
agglomeration benefits.
• Targeting: Targeting 5 REPs which contain the areas with the lowest living
standards (RDHI per capita) is essential to achieving the intensity of funding
required for the intended policy objective of improving living standards for working
people within the constraint of the overall funding envelope. RDHI per capita varies
more significantly between local authorities than REPs and so is most suited to
identifying the places most in need of investment to improve living standards. 
1.6 On announcing the new Local Growth Fund, the UK Government stated the programme
will “fund regional projects which will drive economic growth. That might mean projects
like infrastructure investment, business support, or skills development - projects which
will make a real difference in terms of skilled jobs and people’s prosperity”. It has
subsequently been made clear that the fund should not be passed down to individual
authorities to support local projects, but instead should fund the development of
regional interventions. It has however been recognised that such a regional approach
will take time to develop and as the fund is due to start from 1 April 2026 it has been
agreed that the revenue funding in 2026/27 can support a transition period with local
authority allocations for this year only. 
1.7 The funding allocated to GCR through the Local Growth Fund is a 33% reduction in
relation to what was previously available for similar activities and projects through the
UKSPF programme for the period 2023/24 – 2025/26. This is compounded by a higher
proportion of funding being allocated to capital investment and the requirement to move
to regional interventions. The reduced funding available for North Lanarkshire and the
impact on the activities currently funded through the UKSPF Programme are set out in
section 2.2 of this report, with particular reference to the impact in staffing. It has been
confirmed by the UK Government that a prospectus setting out inventions and
governance requirements for the Local Growth Fund will be published in March 2026.
However, this is likely to follow a similar set of interventions to that already published
for the English Local Growth Fund and section 2.3 of this report sets out
recommendations for how the funding can be distributed in 2026/27. 
1.8 In addition, some of the activities currently funded through the UKSPF programme can
be adapted for delivery through the Pride in Place Impact Fund (PiPIF). Section 2.4 of
this report sets out the proposals for the allocation of that funding stream. 
Page 179 of 454

Page 180

2. Report 
2.1 Local Growth Fund 
Allocation of Funding 
2.1.1 As noted above the Local Growth Fund has been allocated to eligible Regional
Economic Partnerships, and Glasgow City Region (GCR) is to receive £60.9m for the
3-year programme period. This represents a significant reduction in funding from the
previous UKSPF programme and sees a higher proportion allocated to capital
investment – revenue funding in the previous UKSPF programme was 73% of the total
programme but revenue been reduced to only 30% over the 3 years of the Local Growth
Fund. The significant reduction in revenue funding will lead to cuts in funding for
employability, business support, skills, innovation and third sector support. The
allocation of funding to GCR is provided in the table below, noting the reducing level of
funding over the 3-year programme: 
Revenue Capital Total
2026/27 6,900,000 15,800,000 22,700,000
2027/28 6,700,000 14,800,000 21,500,000
2028/29 4,800,000 11,900,000 16,700,000
Total 18,400,000 42,500,000 60,900,000 
2.1.2 As noted above, the revenue funding for 2026/27 can support a transition to towards a
regional approach and it is expected that GCR member authorities will receive a
revenue allocation for year 1 of the Local Growth Fund. GCR Chief Executives Group
has agreed that the UKSPF year 4 allocation methodology is used to allocate the
revenue budget for 2026/27, to support this transition year and that this methodology
is presented for consideration to GCR Cabinet on 5 March. This approach will then
enable individual member authorities to plan for Revenue funding in 2026/27, helping
to support established business support and employability and skills interventions. 
2.1.3 The proposed revenue allocation methodology would lead to the following allocations
to GCR Member authorities: 
2026/27 allocation Proportion
East Dunbartonshire £269,100 3.9%
East Renfrewshire £255,300 3.7%
Glasgow City £2,773,800 40.2%
Inverclyde £365,700 5.3%
North Lanarkshire £1,414,500 20.5%
Renfrewshire £483,000 7%
South Lanarkshire £938,400 13.6%
West Dunbartonshire £400,200 5.8% 
£6,900,000   
2.1.4 In relation to the capital allocation of funds, this should be focused on delivering regional
outcomes and it is proposed that the GCR Economic Development Group develop an
approach for the distribution of the funds available to appropriate projects. 
2.1.5 At this point, there is no Local Growth Fund prospectus for Scotland. This is currently
under development with a commitment for it to be published by the end of March. The
prospectus will provide further detail on the interventions that can be supported through
the Local Growth Fund and the regional governance and reporting model to be put in
Page 180 of 454

Page 181

place. Scotland Office officials have recommended looking at the English prospectus
as a guide in the intervening period but note that the Scottish prospectus will be tailored
to Scottish needs and priorities. The high-level logic model for the Local Growth Fund
highlights the following activities, intermediate outcomes and long-term outcomes
against the vision of kickstarting economic growth and improved regional prosperity: 
Activities Intermediate Outcomes Long term Outcomes
Infrastructure
Investment
Increased development-ready
land and sites
 Expanded labour market
reach across functional
economic areas
 Enhanced
agglomeration benefits
through integrated city
regions
Increased housing supply
Improved utilities and energy
upgrades
Increased physical connectivity
Increased digital connectivity
Business Support
Increased access to finance
 Increased business
innovation and growth
 Stronger more
competitive regional
clusters
Increased uptake of advice and
growth services
Increased innovation and
research and development
Increased digital adoption by
firms
Stronger network and supply
chain integration
Skills
Development
Better alignment with emerging
industry needs
 Higher rates of
economic activity
 Highly skilled workforce
Enhanced job readiness and
employability
Enhanced digital literacy and
technical capability
Increased uptake of
training/apprenticeships 
Impact on North Lanarkshire Funding 
2.1.6 The North Lanarkshire allocation of UKSPF over the 4-year period from April 2022 to
March 2026 has been £19,905,210 providing a mix of capital and revenue funding for
projects across communities and place, support for local businesses and people and
skills projects. The allocation for the last year of the programme, 2025/26, was a
reduction on the previous investment with North Lanarkshire receiving £6,034,163, of
which £1,408,699 (23.3%) was allocated to capital and £4,625,464 (76.7%) to revenue
activities. 
2.1.7 The proposed revenue allocation for North Lanarkshire of £1,414,500 therefore
represents a significant reduction to only 30.6% of what was previously available
through the UKSPF programme. The activities and outcomes to be achieved from the
Local Growth Fund also mean that activities previously supported under the
Communities and Place intervention of UKSPF are unlikely to be eligible in the new
fund. While activities previously supported under the Business support and people and
skills interventions will be eligible, they will be unable to be supported to the same level
of investment. 
Page 181 of 454

Page 182

2.1.8 The reduction in funding will have an impact on service delivery across a range of
activities and also on the staffing that has been funded through UKSPF, and previously
through European Structural funds. During 2025/26 there have been 35 posts (27.1
FTE) within the council funded through the UKSPF programme, across Education and
Families, Chief Executives, Enterprise and Active and Creative Communities. While
many of these staff have substantive posts to return to at the end of the UKSPF funded
contract there are currently 12 (9.8 FTE) staff currently on temporary contracts that
have no right to revert to another post. In addition, there are 5 (4 FTE) permanent posts
based in Enterprise for management and administration that have been fully funded by
external programmes, most recently through UKSPF, and where there is no core
budget to meet the costs. 
2.1.9 In addition, a significant number of posts within Routes to Work Ltd will be impacted by
the reduction in funding. In 2025/26, employability services delivered by Routes to Work
Ltd received just over £1.5m from UKSPF, supporting 25 FTE posts within the
organisation. To prepare for the reduction in funding the organisation has already been
holding vacant posts and not extending temporary contracts in order to help manage
potential staffing reductions. Employability services are also funded by the Scottish
Government through the No One Left Behind programme. The level of funding from the
Scottish Government is expected to be retained in 2026/27 and so there will be no
direct impact on any council employability posts as a result of UKSPF reductions to
employability funding. However, the scale of the reduction in the UK Government
contribution to employability funding overall will mean adjusting services to
accommodate this, with a significant decrease in the number of people engaged and
job outcomes secured by programmes funded through Routes to Work Ltd. 
2.1.10 Given the uncertainty around funding allocations and priorities for 2026/27, contingency
funding of up to £270,000 has been identified to enable temporary contracts to be
extended for an initial 3 month period to end of June.   Further funding may be required
beyond the initial 3 months, to provide more time for staff affected to access alternative
employment, potentially through re-deployment and enable a managed transition to
new service delivery models or, in some cases, cessation of services.   
2.1.11 The UK Government has also confirmed that any underspend incurred within the
UKSPF Programme in 2025/26 can now be carried forward into 2026/27 with an
updated deadline for full spend set for the 30 September 2026. This underspend,
currently expected to be around £60,000, will contribute to the costs of extending staff
on temporary contracts from April noted in paragraph 2.1.9 above. In addition, once the
funding available through the Local Growth funding is confirmed, this should also
reduce the cost to the council of extending contracts for affected staff as some of the
posts can be funded from the 2026/27 allocation. 
2.1.12 Externally, there are also a small number of posts in the third sector funded by UKSPF
which will come to an end at the end of March 2026 and there has been engagement
with the organisations to keep them updated on the funding position. 
Local Growth Fund 2026/27 Proposals  
2.1.13 The Council’s UKSPF Board has recognised the challenges of the reduction in funding
and the impact on projects and staffing currently being funded through the UKSPF
programme. Since the funding announcements from the UK Government in September
and December 2025, it has worked with project lead officers and relevant Chief Officers
to identify the activities that can continue to be provided on the much-reduced budget
and within the scope of the most recent information available on the Local Growth Fund.
Opportunities for service re-design and collaboration are also being progressed.
Page 182 of 454

Page 183

2.1.14 Based on the table set out in section 2.1.5, activities currently funded through the Local
business support and people and skills interventions of the UKSPF Programme are
likely to be eligible for the Loal Growth Fund in 2026/27. This includes business advice
and grants, employability provision, and skills development through the volunteering,
pathways and NL Academies programmes. It is recommended that the revenue
allocation of £1,414,500 is distributed as set out in the table below and that the UKSPF
Board are remitted to consider and approve proposals to meet the objectives of the
Local Growth Fund once the prospectus is published. 
UKSPF Project UK Govt Key outcomes met Proposed
Allocation
Volunteering support • job readiness and
employability £30,000
Business grants to
support growth,
entrepreneurialism and
digital adoption
• access to finance/advice,
• increased digital adoption
£250,000
Expert Help
• Uptake of advice and growth
services, 
• digital adoption
Employability • Job readiness and
employability
£1,134,500
Young People Pathways
• Job readiness and
employability, 
• uptake of training and
apprenticeships
NL Academies
• Alignment with emerging
industry needs, 
• uptake of training and
apprenticeships
Digital Labs • Enhanced digital literacy
TOTAL  £1,414,500 
2.1.15 There are a range of UKPSF funded projects that are unlikely to be eligible for the Local
Growth Fund and where services are currently developing options to integrate activities
into current service delivery where this is possible; explore any alternative external
funding options, and/or reduce scope of service. This includes activities to support
community grants, social enterprise support, core numeracy skills (delivered though
the UKSPF Multiply’s Sum It Up Programme) and support for Visit Lanarkshire
campaigns. 
2.1.16 Final recommendations on whether projects can be supported will be subject to
approval of allocations by GCR Cabinet and UK Government approval of the Local
Growth Fund investment plan. 
2.2. Pride in Place Impact Fund 
2.2.1 The UK Government published guidance on the Pride in Place Impact Fund in
September 2025, identifying 8 local authorities in Scotland, including North
Lanarkshire, to receive £1.5m in capital funding over the period September 2025 to
March 2027. The funding is split over the two financial years with £750,000 allocated
to each year.  The funding is to be used to support activities under the following
objectives:
Page 183 of 454

Page 184

• Community spaces: creating, extending, improving or refurbishing existing
community facilities and enabling community organisations to take control or
ownership of underused but valued local assets. 
• Public spaces: enhancing the physical environment in public spaces - examples
of initiatives include new or improved green spaces or public squares, improved
outdoor play, sports and leisure spaces, installing street furniture, public art or
wayfinding. 
• High street and town centre revitalisation: making these areas more attractive
and welcoming places where people congregate and which encourage economic
activity. Examples of initiatives that could be funded are shop frontage
improvements, adaptations that bring premises back into use, streetscape
improvements, public art, trails and wayfinding, and creating or improving the
infrastructure for regular markets. 
2.2.2 Local authorities are expected to work in collaboration with MPs and other stakeholders
in their area to identify the interventions that will deliver the most benefits to local
residents and breathe new life into the areas in which they live. There is no need to
fund activities under all 3 objectives and the number and scale of projects should meet
local needs. 
2.2.3 Due to the limited time available to identify and deliver capital projects through this fund,
initial work has focused on eligible activities that are already at an advanced stage of
development and have included engagement with local communities. There is also
scope to reconfigure some projects previously supported through the UKSPF that meet
the criteria for the PiPIF such as community grants (linking with the Local Development
Programme) and business grants to enhance retail and business units on our high
streets. A list of project proposal has been circulated to all elected members and is
summarised below: 
Proposal 2025/26 2026/27
Shotts Heritage Centre improvements  80,000
Community Grants for Premises Enhancements   200,000
Refurbishment of council community facilities 35,000 150,000
Heritage Village interpretation and welcome signs 50,000 
Palacerigg Country Park pathway and picnic area
improvements
340,000 
Wishawhill Pump Track extension 150,000 
Local Development Programme projects 66,000 140,000
Business grants for town centre improvements 109,000 150,000
Public realm art projects for town centres  30,000
TOTAL 750,000 750,000  
2.3 Next Steps 
2.3.1 The UKSPF Board and the Enterprise Team will continue to monitor the position and
engage with the UK Government and Glasgow City Region as the Local Growth Fund
programmes continue to develop. 
Page 184 of 454

Page 185

3. Measures of Success
3.1 The measures of success include:
a) Mitigating the impact of the reduction in funding available to support
employability; skills development and business support interventions.
b) Making best use of available resources to improve economic outcomes for the
residents of North Lanarkshire.
4. Supporting Documents 
• Local Growth Fund Policy Statement - Local Growth Fund (England): policy
statement - GOV.UK 
• Pride in Place Impact Fund Prospectus - Pride in Place Impact Fund: prospectus -
GOV.UK 
Pamela Humphries
Chef Officer (Place) 
Page 185 of 454

Page 186

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
An updated EQIA will be required in light of the reductions or cessation to funding.
Work has commenced to complete this. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Details of the impact on reductions in funding are provided within the report. 
The costs of extending contracts for a period of 3 months is currently reported to be
around £270,000. This will be updated in relation to staff changes as they occur. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Services are working with People resources to manage the potential impact on
staff, including extending temporary contracts and alternative employment
opportunities through the redeployment process.
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒
Page 186 of 454

Page 187

If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
A communication plan will be required to convey changes and reduction in the
funds available and the impact on staffing and service delivery. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
This report sets out the risks of significantly reducing or stopping UKSPF activities
at the end of March 2026, and the impact on service delivery this will have. The
UKSPF risk register has been updated to recognise the impact of staff on
temporary contracts leaving which could result in the loss of funding and not
achieving the UKSPF outcomes targets agreed. In addition, the lack of future
funding will lead to closure of projects and the withdrawal of services to the most
vulnerable individuals, businesses and communities across North Lanarkshire. 
As well as a financial and service delivery risk there is a reputational risk to the
Council from the discontinuation of services that are essential elements of our
Programme of Work priorities, most particularly in relation to Transforming Places,
Brighter Futures and Resilient People.
Page 187 of 454

Page 188

To help manage the transition and mitigate the impact on staff affected, an initial 3
month extension for temporary contracts has been agreed 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
UKSPF delivers education and skills programmes targeted at vulnerable young
people preparing to leave school. This contributes to Article 29 – goals of
education. 
A CRWIA is required to assess the impacts of any reduction or cessation of
services. Work has commenced to complete this. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 188 of 454

Page 189

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    AG/REB Date 19/03/26 
Embedding the United Nations Convention on the Rights of the
Child (UNCRC) and Realising Children’s Rights in North
Lanarkshire 
From 
Alison Gordon, Chief Social Work Officer (Education, Families, Justice and
Integrated Practice)
Rachel Blair, Chief Officer (Legal and Democratic)  
E-mail GordonAl@northlan.gov.uk
BlairR@northlan.gov.uk Telephone 
Executive Summary 
This report seeks Committee approval for the adoption of a clear and proportionate “best
practice” policy approach to the incorporation of the United Nations Convention on the
Rights of the Child (UNCRC) within North Lanarkshire Council. 
The report builds on previous reports to the Education, Children and Families Committee
which set out the Council’s ongoing activity to support and strengthen the realisation of
children’s rights, alongside detailed consideration of the legislative framework introduced
by the UNCRC (Incorporation) (Scotland) Act 2024, which came into force on 16 July 2024.
As previously reported, North Lanarkshire Council has a long-established commitment to
children’s rights, with rights-based principles already embedded across strategic priorities,
action plans, professional standards, and service delivery. Since commencement of the
2024 Act, internal governance, systems, and processes have been further strengthened to
support compliance with statutory duties and associated guidance. 
A strong and consistent children’s rights-based approach is fundamental to the Council’s
ambition to support all children and young people to realise their full potential and is integral
to the Resilient People Programme of Work that underpins the Plan for North Lanarkshire.
The report recognises, however, that the final form of the 2024 Act creates a complex and,
in some areas, inconsistent legal framework. This necessitates a clear policy position that
supports the realisation of children’s rights while managing legal risk and ensuring the
Council retains the ability to take proportionate and  appropriate decisions. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Endorse the content of this report, including the analysis of the legislative framework
established by the UNCRC (Incorporation) (Scotland) Act 2024, the associated legal
considerations, and the Council’s existing and ongoing work to support the
realisation of children’s rights; and 
Item 7
Page 189 of 454

Page 190

1. Background 
1.1 The United Nations Convention on the Rights of the Child (UNCRC) was ratified by the
UK in 1991.  As an international treaty, the UNCRC does not automatically have direct
applicability in Scots law. The UNCRC (Incorporation) (Scotland) Act 2024 was enacted
in order to change that.  The 2024 Act had a lengthy journey through Parliament
following a Supreme Court challenge by the UK government. As a result of this
challenge, the final Act is therefore weakened from the original intention behind the
legislation. 
1.2 The compromise position taken by Scottish Government in response to the Supreme
Court challenge was to only require public authorities to comply with the UNCRC in
respect of functions which originate from Scottish Acts of Parliament or from the
common law. Whilst this was viewed as the solution which would provide the greatest
clarity for the public and authorities, the reality is much more complex and is far from
clear. 
Duties under the Act 
1.3 The Council delivers a huge range of functions to the public, all of which will stem from
a statutory function. The statutory landscape for Councils is already complex. Some
functions come from UK Acts, some from Scottish Parliament Acts and another set of
functions which stem from a UK Act which has been later amended by a Scottish Act.
Further functions stem from Regulations and the legal basis for the Scottish Parliament
making those could come from a UK Act or a Scottish Act. Most Council functions relate
to areas which are devolved to the Scottish Parliament. 
1.4 The Act therefore requires the Council to act compatibly with UNCRC in relation to
some functions and not others. In relation to core services delivered to children and
young people there are very significant anomalies which make the legal position
(2) Approve the adoption of the following policy position in relation to the incorporation
of the UNCRC within North Lanarkshire Council: 
Policy on Children’s Rights and the UNCRC
North Lanarkshire Council will apply a children’s rights-based approach across the
organisation and will, so far as possible, act in a way which is compatible with the
United Nations Convention on the Rights of the Child in the performance of all of its
functions, notwithstanding the legislative source of those functions. 
In doing so, the Council will seek to promote, respect, protect, and fulfil children’s rights,
while ensuring that decisions are lawful, proportionate, and financially sustainable,
and that the Council retains the ability to take  appropriate decisions where
competing statutory duties or resource constraints apply. 
The Plan for North Lanarkshire
Priority  Support all children and young people to realise their full potential
Ambition statement
(7) Enhance collaborative working to maximise support and
ensure all our children and young people are included, supported,
and safe
Programme of Work Resilient People
Page 190 of 454

Page 191

extremely confusing for staff but also for children and parents. A summary of the key
areas where the UNCRC does and does not apply are set out in Appendix 1. 
1.5 The duty to act compatibly applies to key partners such as Police Scotland, NHS
Boards and the Integration Joint Board, but again only in relation to functions derived
from Acts of the Scottish Parliament or the common law. As an example, most NHS
functions come from a UK Act so the duty to comply with the UNCRC will not apply to
significant aspects of their work.  
1.6 The duty to act compatibly also applies to any organisation carrying out “functions of a
public nature”. This expressly includes contractors. This means that where services are
commissioned through contract or service level agreement, those organisations will
have a separate, standalone duty to act compatibly with UNCRC, but only if the function
being fulfilled in entering into that arrangement comes from an Act of the Scottish
Parliament. 
1.7 The Act creates new reporting duties which will replace the previous duty to report
contained in the Children and Young People (Scotland) Act 2014. Detailed guidance to
support the reporting requirements has been published by the Scottish Government
and is at Appendix 4.  The Council’s report and plan will be prepared in accordance
with this guidance over the coming months for publication in summer 2026. 
Impact of the Act 
1.8 Statutory Guidance on the UNCRC Incorporation (Scotland) Act 2024 has been issued
by the Scottish Government and is at Appendix 3.  This guidance is high level and, in
practice, may require further interpretation and support to assist services in
understanding how it applies within their specific operational contexts. The Scottish
Government has indicated that it does not intend to produce sector-specific guidance
to support organisations and services in understanding how the Act applies within
particular operational areas, nor separate guidance for contractors or third-party
providers. As a result, local authorities will have a significant role in determining how
best to implement the legislation within their own organisational and service contexts,
taking account of the legal framework established by the Incorporation Act. 
Implementation Work 
1.9 Substantial work has already been undertaken by the Council since implementation of
the UNCRC and understanding the Council’s duties under the 2024 Act.  This includes
the establishment of a Steering Group and a wider Stakeholder Group with a focus on
realising rights and not just legislative compliance. 
1.10 The Steering Group was established in early 2024, working through a framework with
11 headings to assess the position of North Lanarkshire Council and the key actions
required to fully embed a children’s rights based approach. The 11 areas became the
headings in a forward plan, identifying new, established wand future areas of work.
This summary is set out in Appendix 2 to this Report.  Key achievements to date
include:- 
1.10.1 Awareness raising with staff, elected members, children, young people and
families. 
1.10.2 Initial training offer through LearnNL, promoting a national module. 
Page 191 of 454

Page 192

1.10.3 Work with staff and young people on where rights are at risk that will be
presented in a series of podcasts. 
1.10.4 Promotions of the process for child friendly complaints including guidance,
supporting paperwork and the development of a training module. 
1.10.5 Ongoing work with Rights Respecting Schools to achieve the target of 100%
of schools engaged and accredited. In August 2025; 148 of 154 schools have
accreditation, reaching 91% of the 48,112 pupils in North Lanarkshire. 
1.10.6 Participation in the Improvement Service Budget Action Enquiry, bringing six
local authorities together to explore opportunities for child friendly budgeting. 
1.10.7 A two-part audit of reports in the 4th Committee Cycle of 2024-25 in order to
assess if Children’s Rights and Wellbeing Impact Assessments were being
applied appropriately and the quality of the reports that were undertaken. 
1.11 Further to agreement by the Corporate Management Team and the endorsement given
by Education, Children and Families in May 2023, Children’s Rights and Wellbeing
Impact Assessments (CRWIAs) were introduced into the Council’s standard reporting
framework and are, where relevant, highlighted in the impact section of committee
reports.  Whilst the use of CRWIAs is not itself a statutory requirement, adoption of this
tool supports the Council to meet its obligations in this area and also serves to promote
awareness and ownership of children’s rights across all Council services, recognising  
that duties in this area sit with the Council as a whole and not solely with Children’s
Services. 
2. Report 
Implementation of United Nations Convention on the Rights of the Child
(Incorporation) (Scotland) Act 2024 in North Lanarkshire 
2.1  As enacted, the 2024 Act provides that: 
2.1.1 Public authorities must not, in carrying out relevant functions, act incompatibly
with the UNCRC requirements as set out in the Act; 
2.1.2 Children, young people and their representatives will be able to use the courts
in certain circumstances to ensure their rights are recognised; 
2.1.3 Legislation originating from the Scottish Parliament will have to be read in a way
which is compatible with UNCRC requirements wherever possible; 
2.1.4 There are remedial powers which would enable incompatibilities or potential
incompatibilities, to be remedied as considered necessary by the Scottish
Ministers; 
2.1.5 The Children and Young People’s Commissioner Scotland and Scottish Human
Rights Commission will have powers to take legal action to protect children’s
rights; 
2.1.6 The Scottish Government will publish a Children’s Rights Scheme and review
this annually; and 
Page 192 of 454

Page 193

2.1.7 Public authorities listed in the Act will report every three years and Scottish
Parliament will report annually on the actions taken and planned, to secure,
better or further the rights of children. 
2.2 The question of what constitutes a relevant function which requires the Council to act
compatibly with the UNCRC is a key consideration. The complex legal framework
created by the Act creates uncertainty for Council staff and those who provide services
on behalf of the Council.  Decisions need to be made about how to tackle that
complexity and manage the practical implementation of the Act. One option is for the
Council to undertake to incorporate all aspects of the UNCRC as a matter of policy,
whether required to by legislation or not.   
2.3 While attractive in principle, such an approach carries significant legal and financial
risks. It would expose the Council to legal challenge in areas where no statutory duty
exists. Budget-setting is a key example: this function derives from the Local
Government (Scotland) Act 1973 (UK legislation) and is therefore outside the scope of
the Act. Voluntarily extending UNCRC compliance to such functions would significantly
increase litigation risk at a time of acute financial pressure. 
2.4 Given these considerations, and as previously reported to the Education, Children and
Families Committee on 10 September 2024, the Council sought advice from King’s
Counsel specialising in children’s rights law. The proposed policy position reflects that
advice. 
2.5 It is therefore proposed that the following policy is formally adopted: 
2.5.1 North Lanarkshire Council will apply a children’s rights approach and will, so far
as possible, act in way which is compatible with the UNCRC in the performance
of all of its functions notwithstanding the nature of the source legislative
provision. 
2.5.2 In doing so, the Council will seek to promote, respect, protect, and fulfil
children’s rights, while ensuring that decisions are lawful, proportionate, and
financially sustainable, and that the Council retains the ability to take
appropriate decisions where competing statutory duties or resource constraints
apply. 
2.6 This approach enables the Council to promote and strengthen the realisation of
children’s rights while retaining the ability to defend unnecessary or inappropriate legal
challenge. By acting “so far as possible,” the Council aligns with the spirit and purpose
of the legislation without undermining its ability to take lawful, proportionate, and
financially sustainable decisions. 
Next Steps 
2.7 A number of next steps have been identified, which Committee is asked to
acknowledge: 
• Continued engagement with Services to support understanding of legal duties;
• Ongoing delivery of the Steering Group action plan;
• Briefings for elected members; and
• Further awareness-raising for all staff. 
3. Measures of success 
Page 193 of 454

Page 194

3.1 Success will be demonstrated through:  
• Increased awareness and understanding of children’s rights across the Council;
• Proportionate compliance with UNCRC requirements where applicable;
• Organisational readiness to meet legal duties under the 2024 Act;
• Increased and improved use of CRWIAs; and
• Positive internal and external feedback, including from children and young 
people, evidencing progress in realising children’s rights. 
4. Supporting documentation 
4.1 Appendix 1  Key functions table 
4.2 Appendix 2  UNCRC Steering Group Action Plan 
4.3 Appendix 3  Statutory guidance on Part 2 of the UNCRC (Incorporation) (Scotland)
Act 2024 
https://www.gov.scot/binaries/content/documents/govscot/publications/advice-and-
guidance/2024/02/statutory-guidance-part-2-uncrc-incorporation-scotland-act-
2024/documents/statutory-guidance-part-2-uncrc-incorporation-scotland-act-
2024/statutory-guidance-part-2-uncrc-incorporation-scotland-act-
2024/govscot%3Adocument/statutory-guidance-part-2-uncrc-incorporation-scotland-
act-2024.pdf 
4.4 Appendix 4  Statutory guidance on Part 3 of the UNCRC (Incorporation) (Scotland) 
Act 2024
https://www.gov.scot/binaries/content/documents/govscot/publications/advice-and-
guidance/2024/02/statutory-guidance-part-3-uncrc-incorporation-scotland-act-
2024/documents/statutory-guidance-part-3-uncrc-incorporation-scotland-act-
2024/statutory-guidance-part-3-uncrc-incorporation-scotland-act-
2024/govscot%3Adocument/statutory-guidance-part-3-uncrc-incorporation-scotland-
act-2024.pdf 
Alison Gordon       Rachel Blair
Chief Social Work Officer       Chief Officer
(Education, Families,       (Legal and Democratic)
Justice, and Integrated Practice) 
Page 194 of 454

Page 195

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The report has a positive impact in relation to the Public Sector Equality Duty and
the Fairer Scotland Duty. It promotes a children’s rights-based approach across the
Council, supporting equality of opportunity, non-discrimination, and the inclusion of
children and young people, particularly those who may experience disadvantage.
The proposed policy position strengthens consideration of children’s rights in
decision-making and service delivery, supporting fairer outcomes and alignment with
the Council’s wider equality and inclusion objectives. Use of Children’s Rights and
Wellbeing Impact Assessments (CRWIAs) further supports systematic consideration
of impacts on children and young people. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments TO FOLLOW 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The report does not propose new or specific financial commitments. However, it
recognises the potential financial implications associated with the implementation of
the UNCRC (Incorporation) (Scotland) Act 2024, particularly the risk of increased
litigation or resource pressures if UNCRC duties were extended beyond statutory
requirements. The proposed policy position is intended to manage and mitigate
financial risk by ensuring that decisions remain lawful, proportionate, and financially
sustainable, particularly in areas such as budget-setting where no statutory UNCRC
duty applies. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
Page 195 of 454

Page 196

5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The report has significant legal implications arising from the UNCRC (Incorporation)
(Scotland) Act 2024. It sets out the complex statutory framework created by the Act,
including the distinction between functions derived from Scottish and UK legislation,
and the associated duties on the Council. The proposed policy position reflects legal
advice and is designed to support compliance with statutory duties while managing
legal risk, maintaining appropriate decision-making, and avoiding unnecessary
exposure to legal challenge in areas where no statutory UNCRC duty applies. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
No direct impacts with respect to this report however where relevant specific
strands of work eg the Make it Right Campaign have been supported.  
Page 196 of 454

Page 197

5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The primary risk relates to non-compliance with the United Nations Convention on
the Rights of the Child (UNCRC) requirements, particularly if due regard is not
consistently applied in decision-making. Potential impacts include adverse outcomes
for children and young people, reputational damage, and increased scrutiny from
regulators or oversight bodies. 
These risks are assessed and recorded within the relevant Service Risk Register
and are managed through established governance arrangements, including officer
review, impact assessment processes, staff awareness and training, and ongoing
monitoring to ensure compliance with UNCRC duties. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
This report is designed to support the realisation of all areas of Children’s Rights in
North Lanarkshire by formally adopting as policy that the Council will apply a
children’s rights approach and will, so far as possible, act in way which is compatible
with the UNCRC. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? TO FOLLOW 
Yes ☐ No ☐ 
Page 197 of 454

Page 198

Appendix 1
Key Functions Table 
Function Compatibility Duty
Education 
Duty to provide education X
Curriculum √
Additional Support Needs √
Exclusion X
Attendance X
Transport X (but possibly√ for ASN)
Children’s Social Work 
Services to children in need/children
with disability
x
Young carer support √
Voluntary Accommodation for children x
Duties to Looked After Children x
Duty to plan and review for looked after
children
√
Fostering Service √ (but not Private Fostering)
Emergency Protection  √
Children’s Hearings – referrals and
supervision; secure accommodation
√
Permanence and Adoption √
Throughcare and aftercare X and √
Culture 
Libraries and Museums X
Arts/theatres X
Greenspace 
Parks and play areas X
Housing 
Homelessness X and √
Allocations X
Repossession √
Transport 
Partnerships, policy, ticketing
arrangements
√
Page 198 of 454

Page 199

Appendix 2
UNCRC Steering Group  
Action Plan 2024-26 
Areas of work and priorities                Priorty 1 – Active/new area      Priority 2- progressing/established/ ongoing        Priority 3-future area of
work 
1. Leadership  Leadership staff and
elected members 
CRWIA  Planning, evaluation and
reporting 
2.Participation of children
and young people 
Youth participation
structures 
Policy, practice and decision
making 
Approaches and
methods- 
Council  
Approaches and
methods- 
Community
planning  
Feedback 
3. Empowerment of
children and young
people 
Advocacy contract  Rights Respecting Schools  Parents/carers  GIRFEC   
4. Child friendly
complaints 
Child friendly
complaints process 
Prevention and resolve  Improvement, learning and
networks 
5. Training and
awareness raising 
Staff, children, young
people, families and
communities 
Awareness raising  Training and learning     
6. Improving practice,
tools, resources 
Equalities and EQIA  Policy and strategy  Procurement  Links and
networks 
7. Publishing child
friendly and easy read
information 
Feedback on
services and
supports 
Child friendly/easy read
information 
Capacity     
8. Measuring progress           
9. Children’s rights
budgeting 
Service design and
procurement 
Budget
allocation- schools establishments 
Budget allocation- 
Community planning 
CR Budgeting
action enquiry 
10. Accountability and
reporting on children’s
rights 
Planning   Reporting       
Page 199 of 454

Page 200

11. Non
discrimination and rights
at risk 
Equalities policy and
practice 
Information and awareness  Access to support 
Programmes of work 
Access to
support 
Rights at Risk 
Page 200 of 454

Page 201

Information Governance Policies and Guidance: Two-yearly Review
and Update 2025         
North Lanarkshire Council Report 
Does this report require to be approved? ☒ Yes  ☐ No
Ref REB/FE Date 19/03/26 
From Rachel Blair, Chief Officer (Legal and Democratic)
E-mail BlairR@northlan.gov.uk Telephone 
Executive Summary
Consistent with North Lanarkshire Council’s Strategic Policy Framework, all information
governance policies are embedded as sub-policies within the Digital and IT Strategy 2024–
2027, approved by the Policy and Strategy Committee in March 2024. 
The following four information governance policies form a critical part of the governance
framework that underpins the delivery of the Digital and IT Strategy 2024–2027: 
1. Data Protection Policy
2. Payment Card Data Security Policy
3. Information and Cyber Security Policy
4. Records and Information Management Policy
These policies are subject to a formal review cycle every two years to ensure continued
compliance with legislative requirements, alignment with recognised good practice, and
consistency with the Council’s strategic objectives. The previous review of these policies
was approved by the Policy and Strategy Committee in June 2023. 
The scheduled two-yearly review was completed in 2025. As a result of this review, each
policy has been updated to reflect organisational changes, developments in legislation and
regulatory expectations, and the Council’s evolving digital operating environment. The
revised policies are attached to this report for consideration and approval. The next formal
review is scheduled for 2027.
Supporting guidance, standards and procedural documentation associated with each
policy are maintained on a continuous improvement basis. These materials are reviewed,
updated and communicated as required to support effective implementation across the
organisation. 
Recommendations
It is recommended that Policy and Resources Committee: 
(1) Approves the updated information governance policies as attached to this report,
noting that they have been reviewed in line with the Council’s approved review
cycle and updated to reflect current legislative requirements, organisational
arrangements and recognised good practice; and
Policy and Strategy Committee
Item 8
Page 201 of 454

Page 202

(2) Acknowledges that the next scheduled review of these policies will take place in
2027, or earlier where required to reflect legislative change, regulatory
requirements, emerging risks or developments in best practice. 
The Plan for North Lanarkshire
Priority All priorities
Ambition statement All ambition statements
Programme of
Work
1. Background
Statutory / corporate / service requirement 
1.1 The vision for a Digital North Lanarkshire is a key priority within the Council’s
Programme of Work for 2023–2028, as approved by the Policy and Strategy Committee
in March 2023. This vision focuses on developing a skilled and digitally capable
workforce, fostering an innovative and sustainable organisational culture, and providing
strong digital leadership to support the continued social and economic development of
North Lanarkshire. 
1.2 In March 2024, the Policy and Strategy Committee approved the Digital and IT Strategy
2024–2027. This strategy provides the strategic direction required to embed digital
thinking into the Council’s everyday behaviours, decision-making and service delivery
models. It promotes a digital-first approach, ensuring that employees consistently
consider how digital solutions can improve efficiency, resilience, security and the
customer experience.
1.3 The secure management of information and IT assets is fundamental to the effective
delivery of Council services and to maintaining public trust. The Data Protection Policy,
Payment Card Data Security Policy, Information and Cyber Security Policy, and
Records and Information Management Policy are therefore key enabling sub-policies
of the Digital and IT Strategy 2024–2027. 
1.4 Compliance with these policies is mandatory for all individuals who access, use,
manage or process Council information in the course of Council business or in an
official capacity. This includes Council employees, elected members, contractors,
partners and any other individuals granted authorised access to Council information or
systems. Compliance is supported by a framework of standards, procedures and
guidance. 
1.5 The Council undertakes regular reviews of its information governance policies to
ensure that they remain aligned with current legislation, regulatory requirements and
recognised good practice. The previous two-yearly review was approved by the Policy
and Strategy Committee in June 2023. The 2025 review has now been completed, and
the updated policies are presented at Appendices 1 to 4 of this report.
1.6 The next scheduled review of these policies will take place in 2027, unless earlier
review is required due to legislative or organisational change. 
2. Report
2.1 The Data Protection Policy, Payment Card Data Security Policy, Information and Cyber
Security Policy, and Records and Information Management Policy are reviewed on a
Page 202 of 454

Page 203

two-yearly basis to ensure they remain accurate, effective and aligned with the
Council’s strategic vision for a Digital North Lanarkshire, as set out in the Digital and IT
Strategy 2024–2027. 
2.2 The last formal review of these policies was approved by the Policy and Strategy
Committee in June 2023. The 2025 two-yearly review has now been completed.
2.3 The review process was led by the Data Governance Board and the Data Compliance
Management Team, with specialist advice and input provided by relevant subject
matter experts across the Council. This approach ensured that the revised policies
reflect both strategic governance requirements and operational realities. 
2.4 In addition to the core policy documents, the Council maintains a suite of supporting
standards, procedures and guidance to support effective implementation. These
supporting documents are reviewed and updated on an ongoing basis to reflect policy
changes, emerging risks and evolving best practice.
2.5 The updated policies attached as Appendices 1 to 4 have been revised to align with
the corporate policy template and plain English requirements. All hyperlinks have
been reviewed and updated. A summary of the key changes arising from the 2025
review is provided in sections 2.6 to 2.9 below. 
Summary of Key Changes to Policies
Data Protection Policy – Version 8.0 (Appendix 1) 
2.6 As part of the 2025 review, the Data Protection Policy has been updated to reflect
organisational changes, strengthen governance arrangements, and provide additional
clarity on key aspects of data protection compliance. The key changes are: 
2.6.1 Across the policy, references have been updated to reflect organisational
changes, including: 
• Replacement of references to the Business and Digital Service following
recent restructure of Council services;
• Replacement of the Data Management Team with the Data
Management and Compliance Group; and
• Updates to the Data Protection Officer (DPO) and Senior Information
Risk Officer (SIRO) roles to accurately reflect the current allocation of
these functions; 
2.6.2 A new section (9.1.1) has been added to clarify the Council’s approach where
joint controller arrangements exist. This section emphasises the need for clearly
documented roles and responsibilities, transparency for data subjects, and the
provision of appropriate privacy notices that clearly explain joint controller
relationships and points of contact;
2.6.3 The policy has been updated to reflect the statutory requirement for data
processing agreements and to set out the criteria that such agreements must
meet; 
2.6.4 References to “Business Managers” have been replaced with “Managers” to
clarify that the responsibilities set out apply to all managers across the
organisation;
Page 203 of 454

Page 204

2.6.5 Section 16 has been expanded to provide additional clarity on the Council’s
approach to transferring personal data outwith the UK or the European
Economic Area; and 
2.6.6 The term “Special Category Personal Data” has been added to the glossary of
terms to improve clarity and consistency.
Payment Card Data Security Policy – Version 2.0 (Appendix 2)
2.7 As part of the 2025 review, the Payment Card Data Security Policy has been
substantially updated to strengthen governance, improve clarity, and ensure continued
compliance with the Payment Card Industry Data Security Standard (PCI-DSS) and
wider information security requirements. The key changes are: 
2.7.1 The introduction has been expanded to provide greater clarity on the purpose
of the policy and its alignment with the Payment Card Industry Data Security
Standard (PCI-DSS), including explicit confirmation that compliance with PCI-
DSS is mandatory. The purpose section has been revised to align more closely
with the Information and Cyber Security Policy and to clearly reflect the core
information security principles of confidentiality, integrity and availability.
References to legislative and regulatory compliance obligations have also been
expanded;
2.7.2 The scope of the policy has been broadened to explicitly include IT and
information assets. Governance references have been updated to reflect
organisational changes, including updates to the Senior Information Risk Officer
(SIRO) role and the renaming of the Information Security and Risk Team to the
Information Risk and Assurance Team; 
2.7.3 Additional compliance requirements have been introduced, including a
requirement that Council-managed devices are used when accessing Council
systems, subject to limited exceptions. A call-out box has also been added to
highlight IT monitoring activities, in line with the Acceptable Use of IT Policy;
2.7.4 The policy objectives have been updated to align with the Council’s new
security standards framework. They have been expanded to place greater
emphasis on third-party suppliers and service providers, and on compliance
with relevant legislative and regulatory requirements; 
2.7.5 The structure of the security controls section has been revised to align with the
Information and Cyber Security Policy. New sections have been introduced on
risk management and information management, with enhanced focus on
official-sensitive information, access control, data protection, physical security,
incident management, and third-party security responsibilities; and
2.7.6 The appendices have been updated to reflect revised roles and responsibilities,
including those of the Senior Information Risk Officer, the Technology Strategy
Manager, and third-party suppliers and service providers. 
Information and Cyber Security Policy – Version 5.0 (Appendix 3)
2.8 Following the 2025 review, the Information and Cyber Security Policy has been
updated to reinforce the Council’s strategic approach to cyber security, strengthen
governance and compliance arrangements, and ensure alignment with the Digital and
IT Strategy 2024–2027 and recognised good practice. The key changes are:
Page 204 of 454

Page 205

2.8.1 The policy has been renamed from Information Security Policy to Information
and Cyber Security Policy to better reflect the critical role of cyber security in
supporting the Council’s digital-by-default approach to service delivery and
wider strategic objectives;
2.8.2 The purpose of the policy has been strengthened to clearly reference the core
information security principles of confidentiality, integrity and availability,
alongside relevant codes of conduct and third-party contractual obligations.
References to legislative and regulatory compliance have been expanded. The
scope of the policy now explicitly includes both IT and information assets; 
2.8.3 Governance references have been updated to reflect organisational changes.
Policy compliance requirements have been strengthened to explicitly reference
the use of Council-managed devices, IT monitoring activities, third-party
supplier and service provider responsibilities, and alignment with the Council’s
security standards framework;
2.8.4 The security controls section has been enhanced to include expanded risk
management provisions, the introduction of the Security Standards Framework,
and updated references to incident management. Clearer alignment has been
established with business continuity and disaster recovery arrangements, and
a dedicated cyber security framework section has been added. Training and
awareness provisions have been strengthened to include phishing simulation
exercises; and
2.8.5 The appendices have been updated to reflect revised roles and responsibilities
and to include the core functions and categories of the Cyber Security
Framework. 
Records and Information Management Policy – Version 6.0 (Appendix 4) 
2.9 As part of the 2025 review, the Records and Information Management Policy has been
updated to reinforce the importance of effective record-keeping, ensure continued
compliance with statutory requirements, and support the Council’s broader information
governance framework. The key changes are:
2.9.1 References throughout the policy have been updated to reflect organisational
changes, revised system and product names, and the consistent use of
terminology relating to records retention and management; 
2.9.2 A number of enhancements have been made to strengthen the policy, including
greater emphasis on the role of robust record-keeping in evidencing Council
decision-making and accountability. The definition of public records, as set out
in the Public Records (Scotland) Act 2011, has been clarified. Updates have
also been made to improve consistency with the Data Protection Policy and to
strengthen guidance on records storage, accessibility, business continuity
arrangements and secure disposal; and 
2.9.3 The glossary has been revised to improve clarity, remove obsolete terminology,
and introduce new definitions where appropriate to support consistent
understanding and application of the policy.
Page 205 of 454

Page 206

Conclusion 
2.10 The updated information governance policies provide a robust and coherent framework
to support the secure, lawful and effective management of the Council’s information
and digital assets. They reflect current legislative and regulatory requirements, align
with the Council’s strategic ambition for a Digital North Lanarkshire, and incorporate
recognised good practice in information governance, cyber security and records
management.
2.11 Approval of these policies will ensure the Council continues to manage information-
related risks effectively, maintain public trust, and provide a strong foundation for the
delivery of resilient, digital-first services. 
3. Measures of success
3.1 Success in relation to the information governance policies will be demonstrated through
sustained compliance with statutory and regulatory requirements, supported by regular
audits, reviews and evidence of effective implementation. 
Data Protection Policy 
3.2 Key indicators include:
• Appropriate identification and completion of Data Protection Impact
Assessments (DPIAs)
• A reduction in the number of personal data breaches;
• Appropriate data sharing and data processing agreements in place; and
• Increased awareness of international data transfer requirements and
early engagement with the Information Governance Team.
Payment Card Data Security Policy 
3.3 Key indicators include:
• Compliance with the Payment Card Industry Data Security Standard (PCI-DSS)
across all Council payment systems;
• Timely completion of security assessments for all systems processing
cardholder data;
• Implementation of appropriate access controls and encryption measures for
cardholder information;
• Effective monitoring, reporting, and management of security incidents relating
to cardholder data; and
• Assurance that third-party suppliers and service providers meet contractual
security obligations.
Information and Cyber Security Policy 
3.4 Key indicators include:
• Adoption and embedding of the Council’s Security Standards Framework
across all IT and information systems;
• Reduction in the number and severity of information security and cyber
incidents;
Page 206 of 454

Page 207

• Completion of cyber security training for staff, including phishing simulation
exercises;
• Effective management of business continuity and disaster recovery
arrangements;
• Evidence of robust risk assessment and mitigation measures for both Council-
managed and third-party systems; and
• Regular reporting on compliance with cyber and information security policies to
the Data Governance Board and the Business Management Team. 
Records and Information Management Policy
3.5 Key indicators include: 
• Consistent storage of records in line with Council functions and file plans;
• Compliance with the Records Retention Schedule; and
• Improved organisational awareness of guidance on naming, storing and
disposing of records 
4. Supporting documentation 
4.1 Appendix 1 – Data Protection Policy – Version 8.0.
4.2 Appendix 2 – Payment Card Data Security Policy – Version 2.0
4.3 Appendix 3 – Information and Cyber Security Policy – Version 5.0
4.4 Appendix 4 - Records and Information Management Policy – Version 6.0. 
Rachel Blair
Chief Officer (Legal and Democratic) 
Page 207 of 454

Page 208

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact   
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact   
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
The report focuses exclusively on information governance, data protection, cyber
security, payment card security, and records management policies. While these
policies apply to all staff, elected members, and authorised users of Council
information and IT systems, they do not introduce or amend any employment terms,
HR procedures, or staff management policies. Any implications for staff relate solely
to compliance with the information governance framework, training, and awareness
obligations, rather than formal HR policy changes.
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact   
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The updated information governance policies have been revised to ensure
compliance with relevant statutory and regulatory requirements, including data
protection legislation (e.g., the UK General Data Protection Regulation and Data
Protection Act 2018), the Public Records (Scotland) Act 2011, Payment Card
Industry Data Security Standard (PCI-DSS) obligations, and other applicable
information and cyber security legislation. 
The legal impacts are primarily related to:
Page 208 of 454

Page 209

• Ensuring the Council meets its statutory obligations for processing, storing,
and sharing personal and sensitive information;
• Clarifying responsibilities for compliance with international data transfer
requirements;
• Strengthening contractual and legal obligations for third-party suppliers and
service providers;
• Supporting legal accountability and evidencing decisions through robust
records management practices.
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal
data?
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk
Yes ☐ No ☐
5.6   Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes   ☐ No ☒
If Yes, please provide a brief summary of the impact?
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)?
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The report and the updated information governance policies have implications for
the Council’s communications activities insofar as they guide the secure and
compliant handling of information both internally and externally. This includes: 
• Ensuring any communication of personal or sensitive data complies with
data protection legislation;
• Requiring that information shared via Council communications channels
(e.g., websites, social media, press releases) is managed in line with the
Records and Information Management Policy and the Information and
Cyber Security Policy;
Page 209 of 454

Page 210

• Supporting consistent messaging regarding the Council’s approach to
information governance, cyber security, and data protection obligations
when interacting with the public, stakeholders, or partners. 
No proactive public communications campaign is required solely as a result of this
report; however, staff awareness and internal communications may be required to
support implementation of the updated policies.
5.9 Risk impact   
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
The report addresses key operational and strategic risks associated with information
governance, data protection, cyber security, payment card security, and records
management. Risk impacts are highlighted and managed as follows: 
• Assessment and Recording:
o Information-related risks are recorded in the Council’s Corporate and
Service Risk Registers, including risks relating to personal data
breaches, cyber security incidents, and non-compliance with statutory
or regulatory obligations.
o Policy compliance and implementation risks are reviewed by the Data
Governance Board and the Data Compliance Management Team.
• Management and Mitigation:
o Updated policies include clear roles and responsibilities, governance
frameworks, and operational controls to mitigate identified risks.
o Supporting standards, procedures, training, and monitoring
mechanisms (e.g., IT system monitoring, phishing simulations, audits)
ensure proactive risk management.
o Third-party risks are addressed through contractual obligations, due
diligence, and monitoring of supplier and service provider compliance. 
These measures ensure that information governance and associated risks are
actively managed in alignment with corporate risk management processes.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
Page 210 of 454

Page 211

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 211 of 454

Page 212

Data Protection
Policy
Version 8.0, 19 March 2026  
Page 212 of 454

Page 213

Data Protection Policy v8.0
Document control
Title Data Protection Policy
Governance group Data Governance Board
Owner Rachel Blair, Chief Officer (Legal and Democratic) Contact BlairR@northlan.gov.uk 
Author Colette Cameron, Principal Solicitor (Information
Governance)
Contact CameronCol@northlan.gov.uk 
Revision history
Version Originator Review start date Revision description and record of change
8.0 Colette
Cameron
28 July 2025 Bi-annual review.
7.0 Collette Crainie 16 February 2023 Bi-annual review.
6.0 Paul Corrigan 26 March 2021 Bi-annual review.
5.0 Paul Corrigan 30 April 2020 Bi-annual review incorporating feedback from Data
Governance Board and Data Management Team.
4.0 Gerry Gardiner 10 May 2018 To reflect the UK Genera Data Protection
Regulations and Data Protection Act 2018.
3.0 Gerry Gardiner 15 November 2016 Bi-annual review.
2.0 Gerry Gardiner 04 July2014 Data Governance Board consultation.
1.0 Gerry Gardiner 22 February 2013 Data Governance Board consultation. 
Document approvals
Version Governance group Date approved Date approval to be
requested 
(if document still in draft)
8.0 Policy and Strategy Committee  19 March 2026
7.0 Policy and Strategy Committee 08 June 2023 
6.0 Policy and Strategy Committee 03 June 2021 
5.0 Policy and Strategy Committee 11 June 2020 
4.0 Policy and Resources Committee 07 June 2019 
3.0 Policy and Resources Committee 21 June 2017 
2.0 Policy and Resources (Finance and
Customer Services) Sub Committee
16 September 2014 
1.0 Policy and Resources (Finance and
Customer Services) Sub Committee
14 March 2013 
Consultation record (for most recent update)
Consultation status Stakeholders consulted between 15 March 2023 and September 2025
Stakeholders
consulted and dates
Data Governance Board
Employment and Policy Team
Data Management and Compliance Group
Trade Unions (UNISON, UNITE, GMB and EIS)
10 September 2025
27 August 2025
17 February 2026
9 January 2026 
Page 213 of 454

Page 214

Data Protection Policy v8.0
Strategic alignment
Plan for North Lanarkshire
Improving the Council’s Resource Base – A Workforce Strategy that is built around the needs of the
Council (as a single resource base) to deliver the priority outcomes, ensuring future workforce
requirements, new skills and innovative approaches, and succession planning are recognised.
Digital and IT Strategy
The Digital and IT Strategy bring together separate but related plans and policies that contribute to
the development and delivery of our digital vision. The Data Protection Policy is one of these. It
supports the strategy setting out how we protect personal data using principles, rules, and guidelines
to make sure we continue to comply with data protection laws. 
Next review date
Review date 01 May 2027 or earlier where there are changes to legislation, statutory
guidance, or established best practice that require amendment.  
Page 214 of 454

Page 215

Data Protection Policy v8.0
Contents
1. Introduction ...................................................................................................................................... 5
2. Purpose ............................................................................................................................................. 5
3. Scope.................................................................................................................................................. 5
4. Governance ....................................................................................................................................... 6
5. Information risk ................................................................................................................................ 6
6. Data protection ................................................................................................................................ 7
7. Personal data .................................................................................................................................... 7
8. The data protection principles ....................................................................................................... 8
9. Discharging our responsibilities .................................................................................................... 9
9.1. The Controller ......................................................................................................................... 9
9.2. The Data Protection Officer (DPO) .................................................................................... 16
9.3. The Chief Executive and Chief Officers ............................................................................. 16
9.4. Business managers .............................................................................................................. 17
9.5. All users ................................................................................................................................. 17
10. Privacy by design and Data Privacy Impact Assessments (DPIAs) .......................................... 17
11. Data protection incidents and breaches .................................................................................... 18
12. Data protection fee ........................................................................................................................ 19
13. Documenting data processing activities ..................................................................................... 19
14. Sharing information with other Council services and third parties ....................................... 19
15. Data sharing .................................................................................................................................... 20
16. Transferring personal information outwith the UK or EEA ..................................................... 21
17. Rights of individuals ....................................................................................................................... 21
18. Product set ...................................................................................................................................... 23
Appendix 1: Glossary of terms ............................................................................................................ 24 
Page 215 of 454

Page 216

Data Protection Policy v8.0   5
1. Introduction
To deliver services effectively North Lanarkshire
Council (the Council) needs to collect, process and
hold large volumes of information which includes
personal information (personal data) relating to
current, past and prospective customers, clients,
employees, workers, elected members, suppliers, and
contractors.
In addition, it may from time to time be required by law to process personal information to
comply with the requirements of government departments and other public agencies. There
are also instances where we process personal data for contractors and arms’ length external
organisations and third parties process Council information which includes personal data.
To deliver services effectively we need to collect, process, and hold large volumes of
information relating to organisations and individuals. This includes personal data.
2. Purpose
This Data Protection Policy sets out how we protect personal data to comply with data
protection laws using: 
▪ principles, 
▪ rules, and 
▪ guidelines.
3. Scope
This policy is applicable to all personal data held by the Council whether in manual format via
Council information technology systems accessed either on Council premises or via mobile or
home-working equipment. Personal data held on removable devices and other portable media
is also covered by this policy.
The policy applies to all employees, workers, elected members, clients, suppliers, third party
contractors and any other individuals or organisations who access Council information.
This policy is not part of the contract of employment, and the Council may amend it at any time.
However, it is a condition of employment that employees and others who obtain, handle,
process, transport, store, and otherwise process personal data will adhere to the rules of the
policy. Any breach of the policy by an employee will be taken seriously and may result in
disciplinary action. 
Page 216 of 454

Page 217

Data Protection Policy v8.0   6
Elected members are required, in respect of their use of data, to comply with their obligations
as set out in paragraphs 3.21 to 3.23, and 6.2 of the Councillors’ Code of Conduct and
paragraphs 70 to 82 of the associated Guidance. Members need to be aware of the potential
for personal liability under the relevant legislation, in respect of both criminal and civil court
proceedings as well as the imposition of fines by the Information Commissioner.
Guidance to organisations on the UK GDPR is available from the Information Commissioner’s
Office website.
4. Governance
This policy forms part of a suite of documents that are covered by the Digital and IT Strategy. 
The Data Governance Board has approval authority for, and oversight of, this policy. The Data
Management and Compliance Group – as key stakeholders – oversee its review and
consider its contents before referring it on for approval. The Chief Officer of Legal and
Democratic – as the Council’s Senior Information Risk Owner – is accountable for its
governance. The Data Protection team is responsible for the following activities:
1. Produce, publish, and promote this policy;
2. Give guidance on how to apply and comply with this policy through standards, procedures,
and guidance notes – see product set for list and links; 
3. Review every two years, with other reviews when needed. For example, following a critical
security incident, new legislation, a significant threat, an audit action; and
4. Report to management teams, governance and working groups, committees, and scrutiny
panels.
5. Information risk
The collation and holding of information of any
nature creates a risk of information falling into the
hands of third parties or misuse of the information.
To manage those risks the Council has in place a
number of policies.
Protecting the confidentiality and integrity of personal data is a critical responsibility that we
take seriously at all times. The Council is exposed to potential fines of up to 20 million Euros
(approximately £18 million) or 4% of its total annual turnover, whichever is higher and
depending on the breach, for failure to comply with data protection law.  
Page 217 of 454

Page 218

Data Protection Policy v8.0   7
The Senior Information Risk Owner (SIRO) is the Chief Officer (Legal and Democratic). The
SIRO’s duty is in respect of all information collected, held, and processed by the Council. The
SIRO is not a position prescribed or regulated by legislation. It is a position recommended by
the Information Commissioner. The SIRO is responsible for:
1. overall information risk and they will provide written advice on a regular basis to the Chief
Executive on internal control and performance in respect of information risk;
2. assessing the impact of information risks on the Council and how the risks may be managed
ensuring arrangements are put in place to mitigate risks. They will implement and lead
information risk and management processes within the Council; and 
3. advising the Corporate Management Team on effectiveness of information risk
management across the Council.
6. Data protection
The UK General Data Protection Regulation (the UK GDPR) sitting alongside the Data Protection
Act 2018 (the Act) make provision for how personal data (information) about living individuals
in any form including paper and electronic must be collected, processed and held. They impose
restrictions on how the Council may process personal data, and a breach of the data protection
laws could give rise to criminal and civil sanctions, including fines, as well as adverse publicity.
The legislation also provides that: 
1. special categories of personal data (that is, data relating to racial or ethnic origin, political
opinions, religious or philosophical beliefs, trade union membership, and the processing of
genetic data, biometric data, data concerning health, sex life, or sexual orientation); and 
2. personal data relating to criminal offences and convictions shall only be collected
and/or processed for certain specific lawful purposes. 
The Council can only process special categories of data and personal data relating to criminal
offences and convictions where certain additional conditions apply. The Council has produced
an appropriate policy document for such processing.
▪ For details of conditions for processing special categories of personal data see Article 9 of
the UK GDPR and Schedule 1 of the Act. 
▪ For details of conditions for processing personal data relating to criminal offences and
convictions see Article 10 of the UK GDPR and Schedule 1 of the Act.
7. Personal data
This policy adopts the definition of personal data contained in the UK GDPR.
▪ Personal data is any information relating to an identified or identifiable natural person who
can be directly or indirectly identified in particular by reference to an identifier.
▪ Different pieces of information, which collected together can lead to the identification of a
particular person, also constitute personal data.  
Page 218 of 454

Page 219

Data Protection Policy v8.0   8
▪ Personal data that has been de-identified, encrypted or pseudonymised but can be used to
re-identify a person remains personal data.
▪ Personal data that has been rendered anonymous in such a way that the individual is not
or no longer identifiable is no longer considered personal data. For data to be truly
anonymised, the anonymisation must be irreversible.
▪ Examples of personal data include:
→ a name and surname;
→ a home address; 
→ an email address such as name.surname@company.com; 
→ an identification card number; 
→ CCTV images of an individual; 
→ location data (for example the location data function on a mobile phone); 
→ an Internet Protocol (IP) address; or
→ or a cookie ID.
▪ The following are examples of data which are not considered to be personal data:
→ a company registration number; 
→ an email address such as info@company.com; and
→ anonymised data.
8. The data protection principles
The UK GDPR requires organisations which handle
personal data to collect, process, and hold personal
and confidential information securely and
responsibly. This includes destroying information
safely when it is no longer required.
The UK GDPR sets outs the following key principles.
GDPR principle Description
First: Lawfulness, fairness,
and transparency (Section
35 of the Data Protection
Act 2018; UK GDPR Article
5(1)(a))
Personal data shall be processed lawfully, fairly and in a
transparent manner in relation to the data subject.
Second: Purpose limitation
(Section 36 of the Data
Protection Act 2018; UK
GDPR Article 5(1)(b))
Personal data shall be collected for specified, explicit and
legitimate purposes and not further processed in a manner
incompatible with those purposes.
Page 219 of 454

Page 220

Data Protection Policy v8.0   9
GDPR principle Description
Third: Data minimisation
(Section 37 of the Data
Protection Act 2018; UK
GDPR Article 5(1)(c))
Personal data shall be adequate, relevant, and limited to
what is necessary in relation to the purposes for which they
are processed.
Fourth: Accuracy
(Section 38 of the Data
Protection Act 2018; UK
GDPR Article 5(1)(d))
Personal data shall be accurate and, where necessary, kept
up to date; every reasonable step must be taken to ensure
that personal data that are inaccurate are erased or rectified
without delay.
Fifth: Storage limitation
(Section 39 of the Data
Protection Act 2018; UK
GDPR Article 5(1)(e))
Personal data shall be kept in a form which permits
identification of data subjects for no longer than is necessary
for the purposes for which the personal data are processed.
Sixth: Integrity and
confidentiality (Section 40
of the Data Protection Act;
UK GDPR Article 5(1)(f))
Personal data shall be processed in a manner that ensures
appropriate security of the personal data, including
protection against:
▪ unauthorised or unlawful processing, and 
▪ against accidental loss, destruction, or damage
using appropriate technical or organisational measures.
Seventh: Accountability (UK
GDPR Article 5(2))
The Council is also responsible for, and must be able to
demonstrate compliance with, the principles.
9. Discharging our responsibilities
9.1. The Controller
In terms of the legislation, the Council will normally be the Data Controller. In some cases, the
Council may be acting as:
▪ a Joint Data Controller in conjunction with another organisation; or 
▪ a data processor, for example, where it is providing services to an external or arms-length
organisation and is processing information of which that organisation is data controller and
under their instruction in connection with provision of that service.
To ensure compliance with the data protection principles, the Council will:
• Observe fully conditions regarding the lawful, fair, and transparent collection and use of
data.
• Meet its obligations to specify the purposes for which data is used.
• Collect and process appropriate data and only to the extent that it is required to fulfil
operational needs or to comply with any legal requirements.
• Ensure the accuracy of the data used.
Page 220 of 454

Page 221

Data Protection Policy v8.0   10
• Put in place arrangements to determine the length of time the data is held.
• Take appropriate measures to keep the data secure. 
9.1.1 Joint Controllers 
In some circumstances, the Council and a partner organisation or contractor may consider that
both parties are involved in making decisions about the processing of personal data. Where
two or more controllers jointly determine the purposes and means of processing, they are
known as joint controllers. 
In such circumstances, the roles and responsibilities of all parties must be clearly documented
and made available to data subjects, to give data subjects an understanding of how their
personal data will be processed and by whom. It must be clear who the data subject should
contact in each organisation to exercise their rights under the data protection legislation. 
It must also be clear which party will fulfil the legislative requirements in relation to the
provision of privacy notices to data subjects and these privacy notices should explain the joint
controller relationship in a clear and transparent way. 
Page 221 of 454

Page 222

Data Protection Policy v8.0   11
Compliance with the data protection principles
1. Lawful, fair, and transparent obtaining and processing
The Council may only collect, process, and share personal data fairly and lawfully and for
specified purposes. The law restricts our actions regarding personal data to specified lawful
purposes. These restrictions are not intended to prevent processing, but ensure that we
process personal data fairly, lawfully and without adversely affecting the data subject.
Lawful basis
▪ It is essential that the legal ground (lawful basis) being relied on for each processing
activity is identified and documented.
▪ The lawful bases for processing personal information are as follows. At least one of these
must apply when you process personal data:
→ Consent – the individual has given clear consent for you to process their data for a
specific purpose.
→ Contract – the processing is necessary for a contract you have with the individual, or
because they have asked you to take specific steps before entering into a contract.
→ Legal obligation – the processing is necessary for you to comply with the law (not
including contractual obligation).
→ Vital interests – the processing is necessary to protect someone’s life.
→ Public task – the processing is necessary for you to perform a task in the public
interest or for your official functions, and the task or function has a clear basis in law.
→ Legitimate interests – the processing is necessary for your legitimate interests or the
legitimate interests of a third party, unless there is a good reason to protect the
individual’s personal data which overrides those legitimate interests. (This cannot
apply if you are a public authority processing data to perform your official tasks).
▪ For the majority of processing or personal data carried out by the Council the public
task condition will be the appropriate lawful basis, however, it is very important that
the appropriate lawful basis or bases are identified at the outset of the processing activity
and these will vary depending on the nature and circumstances of the processing in
question.
Special category data
▪ For the processing of special category data, a further additional lawful basis for processing
requires to be satisfied. Special category data under data protection law relates to
information about an individual’s:-
→ race or ethnic origin,
→ politics,
→ religion, 
→ trade union membership, 
→ genetics, 
→ biometrics (for ID purposes), 
→ health, 
→ sex life, or
→ sexual orientation.
Page 222 of 454

Page 223

Data Protection Policy v8.0   12
Compliance with the data protection principles
▪ There are extensive lawful bases within Schedule 1 of the Act for processing in relation to
special categories of personal data and data relating to criminal convictions. Advice
should be sought from the Information Governance Team via the Data Protection mailbox
at DataProtection@northlan.gov.uk in relation to proposed processing of such data.
Using personal data
▪ The Council will be clear when telling people how their personal information will be
used. This requirement to tell people will always apply, no matter how the information is
gathered (for example, paper forms, email, surface mail correspondence, web data
collection forms, or any other method). We must say clearly in all of these methods how
we will process people’s personal information.
▪ This should principally be achieved by the use of privacy notices. 
▪ Privacy notices are a legal requirement. They inform data subjects about the collection
and use of their personal data. This relates to the requirement under the legislation that
processing of personal data should be transparent.
▪ Privacy notices should provide individuals with information about our purposes for
processing their personal data, how long their data may be retained and with whom it
may be shared. This information should be available to individuals at the point of
collection of their data. The Council’s general privacy notice and other service specific
privacy notices can be found on our website.
▪ Services should develop their own privacy notices to provide more specific information in
relation to particular categories of processing of personal data in relation to their
functions. Privacy notices should be regularly reviewed and developed to ensure that they
provide accurate and adequate information about the Council’s processing activity.
Consent
In many cases, the Council may process personal information without the consent of the
data subject where this is required or permitted by law. However, the Council will ask for an
individual’s informed consent if this is needed (the individual must understand what their
information will be used for and how it will be shared and stored) (see first data protection
principle). Unless the Council can rely on another legal basis of processing, explicit consent
will be required for processing special categories of personal data. 
▪ An individual consents to tprocessing of their personal data if they indicate agreement
clearly either by a statement or positive action to the processing. Consent requires
affirmative action so silence, pre-ticked boxes or inactivity are unlikely to be sufficient. The
individual may be asked to sign or to tick a box to give their consent. If consent is given in
a document which deals with other matters, then the consent must be kept separate from
those other matters. 
▪ Individuals must be easily able to withdraw consent to processing at any time and
withdrawal must be promptly acted upon. Consent will need to be refreshed if the Council
intends to process personal data for a different and incompatible purpose which was not
disclosed when the individual first consented.
▪ The Council will need to evidence consent captured and keep records of all consents so
that we can demonstrate compliance with consent requirements.
Page 223 of 454

Page 224

Data Protection Policy v8.0   13
Compliance with the data protection principles
2. Purpose limitation
Personal data must be collected only for specified, explicit and legitimate purposes. It must
not be further processed in any manner incompatible with those purposes. 
▪ The Council cannot use personal data for new, different, or incompatible purposes from
those disclosed when it was first obtained, unless consent is obtained or there is a clear
obligation or function set out in law. 
▪ Where information is used for a purpose other than for which it was obtained, privacy
information should be updated accordingly to ensure data subjects are so aware.
3. Data minimisation
Personal data must be adequate, relevant, and limited to what is necessary in relation to the
purposes for which it is processed. The Council:
▪ may only process personal data when required to do so in performance of its duties;
▪ cannot process personal data for any unrelated purposes;
▪ will not collect excessive data; and
▪ will ensure that any personal data collected is adequate and relevant for the intended
purposes.
When personal data is no longer needed for specified purposes, it should be deleted or
anonymised in accordance with the Council’s data retention guidelines.
4. Accuracy
The Council must make sure that all personal information that it holds is accurate and, where
necessary up to date (see fourth data protection principle). 
▪ Information should be reviewed regularly, and service managers must have procedures
in place to make sure that inaccurate or out of date information is updated. 
▪ Information which the Council no longer needs to hold must be destroyed in line with the
Council’s guidelines on Information Security.
5. Storage limitation
Personal data must not be kept in an identifiable form for longer than is necessary for the
purposes for which the data is processed. 
▪ The Council must not keep personal data in a form which permits the identification of
individuals for longer than needed for the legitimate business purpose or purposes for
which we originally collected it, including for the purpose of satisfying any legal,
accounting or reporting requirements. 
▪ The Council will maintain retention policies and procedures to ensure personal data is
deleted after a reasonable time for the purposes for which it was being held; unless a law
requires such data to be kept for a minimum time.
Page 224 of 454

Page 225

Data Protection Policy v8.0   14
Compliance with the data protection principles
▪ The Council will take all reasonable steps to destroy or erase from our systems all
personal data that we no longer require in accordance with all the Council's applicable
records retention schedules and policies. This includes requiring third parties to delete
such data where applicable. 
▪ Individuals will be informed of the period for which data is stored and how that period is
determined.
6. Security, integrity, and confidentiality
Personal data must be secured by appropriate technical and organisational measures against
unauthorised or unlawful processing, and against accidental loss, destruction, or damage. 
We will continue to develop, implement, and maintain safeguards appropriate to our size,
scope and business, our available resources, the amount of personal data that we own or
maintain on behalf of others and identified risks (including use of encryption and
pseudonymisation where applicable). We will regularly evaluate and test the effectiveness of
those safeguards to ensure security of our processing of personal data. 
Personal data may only be transferred to third party service providers who agree to comply
with the policies and procedures required by the Council and who agree to put adequate
measures in place, as requested.
The confidentiality, integrity and availability of personal data must be maintained, that is –
▪ Confidentiality: only people who have a need to know and are authorised to use the
personal data can access it.
▪ Integrity: personal data is accurate and suitable for the purpose for which it is processed.
▪ Availability: authorised users are able to access personal data when they need it for
authorised purposes.
7. Data processors
The law requires the Council to put in place a written contract with each third-party data
processor, which contract must meet specific minimum requirements, including procedures
and policies to maintain the security of all personal data from the point of collection to the
point of destruction. Processing of personal data on the Council’s behalf may only take place
under the written instruction of the Council and must comply with Section 59 of the Data
Protection Act 2018 and Article 28 of the UK GDPR.
Personal data may only be transferred to a third-party data processor if the processor agrees
in writing to comply with those minimum requirements. 
Data processing agreements must meet the following criteria:-
• The agreement must be in writing;
• The processor must be able to provide sufficient guarantees that they are able to
implement appropriate technical and organisational measures to ensure the
protection of the personal data being processed on the Council’s behalf;
• The processor may not appoint any sub processor without authorisation from the
Council’s behalf;
Page 225 of 454

Page 226

Data Protection Policy v8.0   15
Compliance with the data protection principles
• The processor may not appoint any sub processor without authorisation from
the Council, and the Council must be informed of any intended changes in
relation to sub processors;
• The processor must remain liable for any sub processor(s) and the sub
processor must be subject to the same obligations as the processor;
• The processor must only process personal data under documented
instruction from the Council;
• The processor must not make any decisions about the purposes for which the
personal data may be processed;
• The processor’s staff which process personal data must be subject to an
obligation of confidentiality; 
• The processor must ensure the security of processing;
• The processor must assist the Council in relation to Data Subject rights
requests;
• The processor must assist the Council in relation to security, breach
notification, and data protection impact assessments;
• The processor must provide assistance with demonstrating compliance with
data protection legislation and must cooperate with audits and inspection by
the Council or their appointed auditor; 
• The agreement must describe how personal data will be transferred back to
the Council at the end of the agreement and securely deleted by the
processor, unless there are legal reasons for the processor retaining the data. 
The above terms may be included in the main contract or can be the subject of a
separate data processing agreement. 
8. ICO assessments, audits, investigations, and action
The Council must co-operate with any data protection assessment, audit or investigation
carried out or action taken by the Office of the Information Commissioner (ICO). Everyone
subject to this policy must assist with any such assessment, audit, investigation, or action as
required by the ICO and / or the Council.  
Page 226 of 454

Page 227

Data Protection Policy v8.0   16
9.2. The Data Protection Officer (DPO)
The Council is required to appoint a DPO. The DPO is currently the Legal Manager (Governance
and Information). Their responsibility is in respect of personal data, collected, held, and
processed by the Council. They will be involved, properly and in a timely manner, in all issues
which relate to the protection of personal data. The DPO’s responsibilities include the following:
-
▪ Ensuring that
→ the Council complies with the data protection laws,
→ the Council and Council staff are fully informed of their own legal responsibilities and
training of staff, and
→ necessary arrangements are in place for dealing where appropriate with subject access
requests that relate to more than one service of the Council.
▪ Developing and managing the Council’s Data Protection Policy, including development,
implementation and enforcement of this policy and data protection procedures.
▪ Reporting on the Council’s compliance with the data protection laws to the SIRO on a six-
monthly basis.
▪ Providing advice when requested as regards data protection impact assessments and
monitor their performance;
▪ Co-operating with, acting as a point of contact for, and consulting with the ICO, as required.
9.3. The Chief Executive and Chief Officers
The Chief Executive and each Chief Officer’s responsibilities include the following.
▪ Ensuring that 
→ the information under their control is collected, processed, and held in accordance with
this policy and the data protection laws,
→ necessary arrangements, including nominated officers, are in place to deal with subject
access requests,
→ necessary arrangements are in place within their Service for the secure disposal of
personal data, and
→ all processing of personal information complies fully with all the provisions of the data
protection laws and this policy.
▪ Nominating lead contacts for data protection responsibility within their Services to the DPO;
and immediately reporting changes of contact details to the DPO.
▪ Identifying and documenting
→ all categories of personal information held within their service,
→ all processing applied to that personal information, and
→ how long personal information needs to be held within each Service.
▪ Implementing 
→ procedures for the secure destruction of any personal information immediately when
the Council no longer needs to keep it,
→ arrangements and procedures as necessary for the safekeeping and preservation of all
personal information held by their Services and ensuring that no one can get unlawful
access to personal information that is held, and 
Page 227 of 454

Page 228

Data Protection Policy v8.0   17
→ procedures and issuing instructions to make sure that every person who has access to
personal information held by their Service makes use of that information only for the
purposes for which that information is held.
9.4.  Managers
Managers’ responsibilities include:
▪ Ensuring that
→ employees and workers know what they have to do under the data protection laws and
are trained in data protection,
→ confirming to the DPO when appropriate training has been undertaken by employees
and maintaining records of training,
→ disciplinary action up to the point of dismissal is taken where an employee or worker
has deliberately breached the terms of the data protection laws or this policy or of any
of the Council’s own procedures,
→ employees and workers know that they could face criminal proceedings if they
deliberately or recklessly destroy information, obtain information or disclose it
unlawfully.
→ personal information held is accurate and up to date.
▪ Determining whether a Data Privacy Impact Assessment (DPIA) needs to be undertaken and,
if so, putting in place appropriate arrangements to ensure that such a DPIA is undertaken
and completed. The DPIA and Guidance can be found at the following link:- 
DPIA Guidance and Lawful Bases Ver 0.3.docx
9.5. All users
All users must:
▪ Observe and comply with the data protection principles.
▪ Ensure that: 
→ personal information is properly protected at all times – this requires continued
compliance with the data protection laws, this policy and all other Council information
policies, procedures, and guidance, and
→ individual archives, or any personal records they hold, are not retained when they are
no longer required.
▪ Report any observed or suspected breach of this data protection policy or related
information procedures and guidance.
10. Privacy by design and Data Privacy
Impact Assessments (DPIAs)
We are required to implement privacy by design measures when processing personal data by
implementing appropriate technical and organisational measures (like pseudonymisation) in
an effective manner, to ensure compliance with data privacy principles. Pseudonymisation
describes removing or replacing information within data set which identifies an individual. 
Page 228 of 454

Page 229

Data Protection Policy v8.0   18
Users must assess what privacy by design measures can be implemented on all programs,
systems and processes that process personal data by considering the following:
▪ the state of the art;
▪ the cost of implementation;
▪ the nature, scope, context, and purposes of processing; and
▪ the risks of varying likelihood and severity for rights and freedoms of data subjects posed
by the processing.
The Council must also conduct DPIAs in respect to high-risk processing.
Services should conduct a DPIA (and discuss the findings with the DPO) when implementing
major system or business change programs involving the processing of personal data including:
→ use of modern technologies (programs, systems, or processes), or changing technologies
(programs, systems, or processes);
→ automated processing including profiling and automated decision making;
→ large scale processing of special categories of data; and
→ large scale, systematic monitoring of a publicly accessible area.
A DPIA must include:
1. a description of the processing, its purposes and the Council's legitimate interests, if
appropriate;
2. an assessment of the necessity and proportionality of the processing in relation to its
purpose; 
3. an assessment of the risk to individuals; and
4. the risk mitigation measures in place and demonstration of compliance.
The DPO is responsible for producing guidance on DPIAs and reviewing the guidance every
alternate year commencing October 2012.
11. Data protection incidents and breaches
The UK GDPR requires data controllers to keep a written record of data breaches, near misses
or incidents. This is kept by the Council’s DPO. 
▪ Where any breach is assessed as resulting in a risk to the rights and freedoms of the
individual(s) affected there is a requirement to notify the ICO of the breach within 72 hours
of the breach occurring. 
▪ Where the breach is likely to result in a high risk to the rights and freedoms of affected
individuals the UK GDPR requires that the individual(s) is/are informed without undue delay. 
All incidents must be reported using the Data Breach Notification Form, whether or not
the incident results in a breach of the data protection laws and/or actual damage or
loss to any person, to the DPO in accordance with the Data Protection Breach and Incident
Management Protocol. To assist you in completing the Data Breach Notification form,
please access the relevant guidance 2024 06 13 Personal Data Breach Guidance.docx The
DPO will take appropriate action in respect of the incident, in accordance with the said
protocol. Incidents are defined/explained the protocol. 
Page 229 of 454

Page 230

Data Protection Policy v8.0   19
12. Data protection fee
It is the responsibility of the DPO to ensure payment of the annual data protection fee to the
ICO and to provide all information required by the ICO when doing so.
13. Documenting data processing activities
The Council must document and maintain a written record of its data processing activities.
The DPO is responsible for ensuring that all categories of personal information and data
subjects held by the Council are documented, including:
1. the uses to which the information is put;
2. the categories of recipients of the personal information;
3. details of transfers to third countries (including the transfer mechanism safeguards in
place);
4. the period for which the information will be held; and 
5. a description of the technical and organisational measures in place to keep the information
secure. 
To enable the documentation to be kept up to date at all times, it is the responsibility of the
Chief Executive, the Depute Chief Executive and each Chief Officer to advise the DPO
immediately of any:
▪ new categories of information or data subjects held in his/her service;
▪ changes in the uses to which his/her service is putting any personal information his/her
service holds;
▪ categories of personal information or data subjects which are no longer held by his/her
service;
▪ changes in categories of recipients of personal information held in his/her service;
▪ changes in the transfer of personal information to third countries (including the transfer
mechanism safeguards) in his/her service;
▪ changes in the retention periods for personal information held in his/her service; and
▪ changes in the technical and organisational measures in place to keep information secure
in his/her service. 
14. Sharing information with other Council
services and third parties
The Council must protect against processing personal information unlawfully. In most cases
personal information can only be shared between Council services and/or third parties where
the individual concerned knows that such sharing may happen and where the processing
complies with the data protection principles. The first data protection principle states that
personal information shall be processed fairly, lawfully and in a transparent manner.  
Page 230 of 454

Page 231

Data Protection Policy v8.0   20
Personal data that is provided to a service within the Council is not automatically available to
all other Council services. 
▪ It is important to understand the purpose or purposes for which the information was
originally obtained and whether the data subject would reasonably anticipate that this
information would be shared with another Council service. 
▪ Personal information can be shared between Council services where there is a lawful basis
to do so, and data subjects are aware of how the data will be used. 
Where a request for personal information is received from a third party, the identity of the
requester and the need for the information must be known before consideration is given to
providing it. 
▪ Personal information can be given to the police or the procurator fiscal to help with a
criminal investigation and to certain statutory authorities/agencies (such as DWP and
HMRC). 
▪ This only applies in certain circumstances, so such requests for disclosure must be made in
writing, providing details of the data subject, reason for disclosure, name of requesting
officer and certification by a senior officer. 
▪ A record must be kept of all such disclosures by services and a report made available to the
DPO immediately upon request.
In all cases, if there are any concerns at all about an enquirer or their enquiry, information must
not be given out, and the enquiry should be referred to the DPO.
15. Data sharing
Generally, the Council is not allowed to share personal data with third parties unless certain
safeguards and contractual arrangements have been put in place. 
Services and officers might be approached and asked if the Council will enter into a data
sharing agreement with another organisation. A data sharing agreement addresses
arrangements whereby one organisation shares personal data with another organisation. 
The Council will only share personal data it holds with third parties if:
1. they have a need to know the information for the purposes of providing the contracted
services;
2. sharing the personal data complies with the Data Protection Principles;
3. the third party has agreed to comply with the required data security standards, policies and
procedures and put adequate security measures in place;
4. the transfer complies with any applicable cross border transfer restrictions; and
5. any necessary information sharing or data processing agreements are in place.
A statutory Data sharing: a code of practice | ICO in respect of data sharing arrangements
between organisations has been issued by the ICO under Section 121 of the Data Protection
Act 2018.
The code explains how the 2018 Act applies to the sharing of personal data. It provides practical
advice to organisations that share personal data and covers systematic data sharing
arrangements as well as ad hoc or one-off requests to share personal data.  
Page 231 of 454

Page 232

Data Protection Policy v8.0   21
Data sharing agreements should be approved by the business manager for the service
concerned and the negotiation and adjustment of the necessary legal documentation should
be referred to the DPO and the Chief Officer of Legal and Democratic services, who will hold
the signed completed agreements. The Council holds a record of all data sharing agreements. 
16. Transferring Personal Information
Outwith the UK or EEA
Both the UK GDPR and the Data Protection Act 2018 put restrictions on the transfer of personal
data to countries outwith the UK. These restrictions are to ensure that such transfers do not
undermine the level of protection for personal data. The Council will not transfer personal data
outside the European Economic Area (EEA) unless this cannot be avoided. 
1. The Council will only transfer data outside the UK and the EEA when it is satisfied that the
party which will handle the data and the country it is processing it in will provide adequate
safeguards for personal privacy. Transfers may take place to third countries which are the
subject of “adequacy regulations” by the UK Government. Currently these countries and
territories are Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia,
Finland, France, Germany, Greece, Hungary, Ireland, Italy, Latvia, Lithuania, Luxembourg,
Malta, Netherlands, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Iceland,
Norway, Liechtenstein, Gibraltar, Andorra, Argentina, Faroe Islands, Guernsey, Isle of Man,
Israel, Jersey, New Zealand, Switzerland, Uruguay, Japan (only private sector organisations),
and Canada (only covers data subject to Canada's Personal Information Protection and
Electronic Documents Act). 
2. Transfers may also take place where the recipient in the third country has provided
appropriate safeguards, and on condition that enforceable data subject rights and effective
legal remedies for data subjects are available. Examples of appropriate safeguards are:- 
• Standard clauses adopted by the UK Government
• Binding corporate rules
• Contract clauses authorised by the Information Commissioner 
3. The advice of the Data Protection Officer should be sought in relation to such issues. 
4. If the Council need to transfer any personal information overseas in relation to a particular
activity, this will be explained in the specific privacy statements relating to that function
along with a description of the protective measures we have put in place to keep it secure. 
17. Rights of individuals
Page 232 of 454

Page 233

Data Protection Policy v8.0   22
All users must respect the rights of all individuals (data subjects), including employees and
elected members. These include rights to:
▪ receive certain information about the Council’s processing activities;
▪ request access to their personal data that we hold;
▪ prevent our use of their personal data for direct marketing purposes; 
▪ ask us to erase personal data;
→ if it is no longer necessary in relation to the purposes for which it was collected or
processed,
→ to rectify inaccurate data, or
→ to complete incomplete data; 
▪ restrict processing in specific circumstances;
▪ challenge processing which has been justified on the basis of our legitimate interests or in
the public interest;
▪ object to decisions based solely on automated processing, including profiling;
▪ prevent processing that is likely to cause damage or distress to the data subject or anyone
else;
▪ where processing is based on consent, withdraw consent to processing at any time;
▪ be notified of a personal data breach which is likely to result in high risk to their rights and
freedoms;
▪ make a complaint to the ICO; and 
▪ in limited circumstances, receive or ask for their personal data to be transferred to a third
party in a structured, commonly used, and machine-readable format.  
Page 233 of 454

Page 234

Data Protection Policy v8.0   23
The identity of an individual requesting data under any of the rights listed above should be
verified before disclosing any personal information. 
18. Product set
The table below lists documents in the Data Protection Policy product set and other related
products. This may include links to other file types, websites, and IT systems.
▪ Those listed under policies, procedures and guidance are the responsibility of the Data
Protection team.
▪ Those listed under related products are the responsibility of other teams or services.
Product type Product
Procedures ▪  Data Breach Notification Form
▪ Data Protection Breach and Incident Management Protocol
▪ Data Protection Impact Assessment Template
▪ Data protection procedures and guidance
▪ Register of Data Sharing Agreements 
Guidance ▪ DPIA and Lawful Bases
▪ SAR Guidance
Related products ▪  Acceptable Use of IT Policy
▪  Digital and IT Strategy
▪ Discipline Policy 
▪ Information Asset Register
▪  Information Security Policy
▪ Records and Information Management Policy
▪ Records Retention Schedule
▪  Risk Management Strategy 
▪ Privacy notice
Legislation,
regulations, and
government
guidance 
▪ Councillors’ Code of Conduct
▪ Data Protection Act 2018
▪ Schedule 1 of the Data Protection Act 2018
▪ Section 121 of the Data Protection Act 2018
▪ ICO guidance on the UK General Data Protection Regulation
▪ ICO Data Sharing Code of Practice
▪ ICO guidance to organisations on the UK GDPR
▪  ICO Special Category Data
▪ The Data Protection, Privacy and Electronic Communications
(Amendments etc.) (EU Exit) Regulations 2020
▪ UK General Data Protection Regulation
▪ Article 9 of the UK GDPR
▪ Article 10 of the UK GDPR  
Page 234 of 454

Page 235

Data Protection Policy v8.0   24
Appendix 1: Glossary of terms
Term Description
The Act Data Protection Act 2018
All Users All parties who have access to Council information including
employees, elected members and third-party contractors and
any other individuals or organisations who access Council
information.
Council Information Council information includes data, records, paper, and digital
formats.
Controller The people or organisations who determine the purposes for
which, and the manner in which, any personal data is processed.
They have a responsibility to establish practices and policies in
line with the data protection laws.
The Council is the controller of all personal data used in its
business.
Data Protection Laws The UK GDPR and the Act
DPO Data Protection Officer
DWP Department of Work and Pensions
The UK GDPR UK General Data Protection Regulation 
HMRC Her Majesty's Revenue & Customs
ICO Office of the Information Commissioner
Personal Data Any information relating to an identified or identifiable natural
person (‘data subject’); an identifiable natural person is one who
can be identified, directly or indirectly, in particular by reference
to an identifier such as a name, an identification number, location
data, an online identifier or to one or more factors specific to the
physical, physiological, genetic, mental, economic, cultural or
social identity of that natural person.
Special Category
Personal Data
Special categories of personal data means personal data
revealing racial or ethnic origin, political opinions, religious or
philosophical beliefs, or trade union membership, and the
processing of genetic data, biometric data for the purpose of
uniquely identifying a natural person, data concerning health or
data concerning a natural person’s sex life or sexual orientation.
Page 235 of 454

Page 236

Data Protection Policy v8.0   25
Term Description
Processing Any operation or set of operations which is performed on
personal data or on sets of personal data, whether or not by
automated means, such as collection, recording, organisation,
structuring, storage, adaptation or alteration, retrieval,
consultation, use, disclosure by transmission, dissemination or
otherwise making available, alignment or combination,
restriction, erasure or destruction.
Processor Any person who processes personal data on behalf of a controller
such as the Council. 
Council employees are excluded from this definition, but it could
include suppliers which handle personal data on behalf of the
Council, for example where the Council outsources IT, payroll,
paper waste disposal, and mail shot / marketing services.
SIRO Senior Information Risk Owner. 
Page 236 of 454

Page 237

PAYMENT CARD DATA
SECURITY POLICY
VERSION 2.0, MARCH 2026 
Page 237 of 454

Page 238

Payment Card Data Security Policy v2.0  
Document control
Title Payment Card Data Security Policy
Owner Chief Officer 
(Legal and Democratic)
Contact InformationRiskAndAssuranceTeam
@northlan.gov.uk
Governance group Data Governance Board
Author Information Compliance Officer Contact InformationRiskAndAssuranceTeam
@northlan.gov.uk 
Revision History
Number Originator Date review commenced Revision description/record of change
2.0 Information Risk Manager 28 February 2025 Two-yearly review and change of
writing style from second to third
person.
1.0 Information Risk Manager None New policy. 
Document Approvals
Number Governance group Date approval granted Date approval to be requested
(if document still draft)
2.0 Policy and Strategy Committee  19 March 2026
1.0 Policy and Strategy Committee 08 June 2023 
Consultation Record (for most recent update)
Status of document consulted upon Stakeholders consulted between 11 March 2025 and
22 December 2025.
Stakeholders consulted and dates Data Management Team
Technology Strategy Manager
Data Governance Board
PCI DSS Governance Board
Corporate Management Team
11 March 2025
11 March 2025
26 March 2025
03 April 2025
22 December 2025 
Strategic Alignment
Plan for North Lanarkshire
Improving North Lanarkshire’s resource base – Build a workforce for the future capable of delivering on
our priorities and shared ambition.
Digital and IT Strategy
The Digital and IT Strategy is critical to enabling the Council to deliver on its vision. It sets the standards
and provides the direction for the strategies, policies, and plans which enable the delivery of critical
public services, business as usual activities and the investment programmes of work. 
The Payment Card Data Security Policy is one of these. It supports the strategy by providing a safe
framework for processing, storing and transmitting payment card and cardholder details in line with
mandatory worldwide standards. 
Next review date
Review date March 2028 
Page 238 of 454

Page 239

Payment Card Data Security Policy v2.0  
Contents
1 Introduction ...................................................................................................................................... 1
2 Purpose ............................................................................................................................................. 1
3 Scope.................................................................................................................................................. 3
4 Governance ....................................................................................................................................... 3
5 Policy compliance............................................................................................................................. 4
6 Policy objectives ............................................................................................................................... 5
7 Security controls............................................................................................................................... 5
7.1 Managing risk ......................................................................................................................... 5
7.2 Managing information .......................................................................................................... 6
7.3 Operational security .............................................................................................................. 6
7.4 Physical security ..................................................................................................................... 7
7.5 Third-party supplier and service provider security ........................................................... 8
7.6 Training and awareness ........................................................................................................ 9
8 Product set ........................................................................................................................................ 9
Appendix A: Payment card data handling roles and responsibilities ............................................ 11 
Page 239 of 454

Page 240

Payment Card Data Security Policy v2.0  1
1 Introduction
North Lanarkshire Council (the Council) takes credit and
debit card payments for a range of goods and services –
such as theatre tickets, special uplifts, council tax and
housing rents. The Council must take card payments in a
way that protects it and its customers from data breaches
and fraud.
This policy sets out how the Council – and anyone who operates on its behalf to deliver or
supply services – process credit and debit card payments securely in line with the Payment
Card Industry Data Security Standard (PCI-DSS). Managed by the Payment Card Industry
Security Standards Council, this is a mandatory information security standard that applies
worldwide to every organisation that stores, processes, or transmits cardholder data. It helps:
▪ reduce the likelihood of credit and debit card fraud;
▪ protect the processing, storage, and transmission of card and cardholder details; and
▪ secure how the Council handles data and its exposure to compromise.
The Council uses the following payment channels.
1. Online – self-service; customers make payments through websites and web services.
2. Point-of-sale payment card machine – face to face; customers pay at a Council facility.
3. Telephone – remote and self-service; customers speak to agents over the phone and
make payments using an automated system.
PCI-DSS is mandatory.
The consequences of non-compliance include financial penalties, no longer being
allowed to process card payments, loss of revenue, and reputational damage.
2 Purpose
This policy provides a framework to effectively
protect the security of all card payments the Council
receives and processes.
It makes sure the Council
▪ handles all payment card data and cardholder details securely, and
▪ complies with all PCI-DSS requirements.  
Page 240 of 454

Page 241

Payment Card Data Security Policy v2.0  2
In doing so, it balances the benefits and risks of processing card payments, in line with the
three core principles of information security – known as the CIA triad. 
Confidentiality
Only those who should see it, do see it.
Integrity
Information is correct and kept up to date, and
only used for its intended purpose.
Availability
Authorised users have access to information
when they need it.
This policy defines the security measures designed to protect and minimise threats to all
three elements of the CIA triad for processing information via card payments at the OFFICIAL-
SENSITIVE tier, as per the UK Government’s Security Classification Policy. It is a corporate risk
control factor and aligns with the following.
▪ Digital and IT Strategy – this brings together separate but related plans and policies,
including this one, that contribute to the Council’s digital vision. 
▪ Its sister policies that help secure information.
▪ Data Protection
▪ Information and Cyber Security
▪ Records and Information Management
▪ Acceptable Use of IT Policy – this informs the Council’s IT users on how to appropriately
use IT assets to access, store and process information.
▪ The Information Classification and Handling Security Standard – how to classify and
handle information while safeguarding its confidentiality, integrity and availability.
▪ Any third-party supplier or service provider contractual compliance obligations.
▪ Legislative and regulatory compliance obligations and guidance. This includes:
▪ Computer Misuse Act 1990
▪ Copyright, Designs and Patents Act 1988
▪ Cyber Resilient Scotland: strategic framework – Public Sector Action Plan
▪ Data Protection Act 2018
▪ General Data Protection Regulations
▪ Government Security Classifications
▪ Payment Card Industry Data Security Standard
▪ Public Bodies (Joint Working) (Scotland) Act 2014
▪ Public Records (Scotland) Act 2011
▪ Public Services Network Connection Compliance 
CIA triad
Availability
Confidentiality
Integrity
Page 241 of 454

Page 242

Payment Card Data Security Policy v2.0  3
3 Scope
This policy applies to all aspects of payment card data security, including the following.
1. All IT assets – systems, services, and devices – that the Council uses to store, process,
transmit or receive payment card data and cardholder details – including how it specifies,
designs, develops, installs, operates, connects, uses, and decommissions them.
2. All information assets relating to card payments – data, files, documents, records and
knowledge – that it creates or receives from third parties, stores and processes in the
following formats.
▪ Digital: IT and communication systems containing data, records, and digital files
hosted within the Council IT network and on cloud-based services.
▪ Paper: Printed or handwritten, stored in Council and authorised third-party locations.
▪ Spoken: Two or more people communicating by talking or using sign language – in
person, over the phone, in online meetings – including using interpreters for signing
and spoken languages other than English.
3. Every authorised person who processes, accesses or otherwise handles payment card
data and cardholder details on the Council’s behalf. This includes all employees,
Councillors, contractors, consultants, third-party suppliers and service providers,
temporary agency staff, modern apprentices, students, volunteers, and anyone else with
authorised access.
4 Governance
The Policy and Strategy Committee has approval authority for, and oversight of, this policy.
The Data Management Compliance Group (formerly Data Management Team), the Data
Governance Board then the PCI DSS Governance Board – as key stakeholders – oversee
its review and consider its contents before referring it on for approval. The Chief Officer of
Legal and Democratic – as the Council’s Senior Information Risk Owner – is accountable for
its governance. 
The Information Risk and Assurance team is responsible for the following activities.
1. Produce, publish and promote this policy.
2. Give guidance on how to apply and comply with this policy through standards, procedures
and guidance notes – see product set for list and links.
3. Review every two years, with other reviews when needed. For example, following a critical
security incident, new legislation, a significant threat, an audit action.
4. Report to management teams, governance and working groups, committees and scrutiny
panels.  
Page 242 of 454

Page 243

Payment Card Data Security Policy v2.0  4
5 Policy compliance
Every person who processes card payments and or
handles cardholder data in the course of Council-
related work or in an official capacity, must comply
with this policy, and all the policies, standards,
procedures and guidance it references.
This includes:
1. only using the data for its intended purpose – unless authorised to do otherwise;
2. maintaining its confidentiality and integrity;
3. keeping it safe; and
4. only using Council managed devices to access Council information and systems, and
conduct Council business – subject to limited exceptions detailed in the Acceptable Use of
IT Policy and excluding third parties delivering services on its behalf as defined in
individual contracts.
Appendix A describes the roles and responsibilities of the following key people and groups in
supporting, promoting and complying with this policy.
▪ Chief Executive
▪ Chief Officer of Finance and Technology
▪ Data Governance Board
▪ Senior Information Risk Owner
▪ Technology Strategy Manager
▪ Third-party suppliers and service providers
▪ Corporate Management Team
▪ PCI DSS Governance Board
▪ Data Management Compliance Group
▪ Information Risk Manager
▪ All Managers
▪ Everyone in the scope of this policy. 
Important note regarding the acceptable use of IT
Everyone must understand that – in line with the Acceptable Use of IT Policy – the Council:
▪ routinely carries out a range monitoring activities of its IT assets for compliance,
security, operational, performance, and maintenance purposes;
▪ reserves the right to formally investigate individual usage – by exception and under
strict controls – to help identify potential prohibited use or misuse, as per the Discipline
Policy; and
▪ will refer any suspected unlawful acts to the appropriate authorities – this includes the
police, and professional and regulatory bodies.
Page 243 of 454

Page 244

Payment Card Data Security Policy v2.0  5
6 Policy objectives
This policy sets the Council’s strategic position and
lays the foundations for effective payment card data
security.
Its key objectives are as follow.
1. Show clear executive-level understanding of the value of information and the need to
make resources available to protect card data, including the IT infrastructure and systems
that to store, process and transmit it.
2. Show key stakeholders – such as elected members, residents, customers and service users
– that the Council treats and protects cardholder data in line with its value and sensitivity.
3. Help everyone who processes card payments and or handles cardholder data on behalf of
the Council to understand:
a. why they must protect its confidentiality, integrity, and availability;
b. the controls it uses to protect this information; and
c. their role in this.
4. Make sure third-party suppliers and service providers:
a. understand – at an organisational and individual level – their responsibilities and
contractual obligations in relation to all relevant security measures; and
b. can demonstrate their compliance with Council policies, standards and procedures.
5. Promote compliance with all relevant legislation and regulations.
6. Align processes for payment card data security standards, procedures, and guidance with
the Council’s Security Standards Framework.
7 Security controls
7.1 Managing risk
Managing risk is critical to keeping information secure. This process includes –
▪ Identifying, assessing, and monitoring risks to information, and information processing
systems and storage facilities.
▪ Preventative mitigations and response planning to manage threats to information and IT
assets. These threats include human error, public infrastructure damage or failure, cyber
attacks, malicious and unwanted email, social engineering, supply chain security threats,
and insider threats.  
Page 244 of 454

Page 245

Payment Card Data Security Policy v2.0  6
The Council does the following to manage risks to payment card data.
1. Uses network controls, specialist systems and privileged utility programs to protect its IT
infrastructure.
2. Produces and promotes information management policies.
3. Produces and promotes security standards, as per its Security Standards Framework. Each
standard contains specific minimum security measures.
4. Develops and implements security operational procedures and user guidance.
5. Produces mandatory training for all employees and targeted training for employees who
process payment card data.
6. Agrees specific information and cyber risk treatment plans – and invokes them when it
needs to – in line with the Risk Management Strategy.
7.2 Managing information
This policy – and related Data Protection, Information and Cyber Security, and Records and
Information Management policies – define how the Council manages and uses
information. It has a range of supporting products, relating to specific elements of this. In
particular –
1. Information classification and handling: The Information Classification and Handling
Security Standard outlines how to classify, protectively mark, and handle sensitive
information. Payment card data is OFFICIAL-SENSITIVE – PERSONAL.
2. Records retention: The Records Retention Schedule specifies
2.1. how long to keep payment card data, and
2.2. how to securely dispose of it, including the following.
▪ Securely destroy any sensitive card data when no longer needed so that it’s
unrecoverable.
▪ Securely delete all digital data – on all systems and services – when no longer
needed.
▪ Destroy all hard copies of cardholder data when there’s no longer a valid business
reason to keep it.
7.3 Operational security
Information is at the core of all Council operational activities. Procedures and controls to
securely manage every stage of its lifecycle, covering how to create, store, use, share, and
destroy or retain information. Key operational activities for payment card data include the
following.
1. Compliance: Legislation and regulations, data sharing arrangements and contractual
obligations.
2. Access controls to manage and restrict access to cardholder data, including –
2.1. User access including using permissions and privileges. 
Page 245 of 454

Page 246

Payment Card Data Security Policy v2.0  7
▪ Clearly defined job functions that must access cardholder data.
▪ Restrict and pre-authorise all access to cardholder data – including the long card
number, personal information and business data – to only those who have a
legitimate business need to view it. Don’t give anyone else access to this data.
2.2. Access to IT systems and services including system controls to protect against
unauthorised access, service disruption, data breach and data loss.
2.3. Third-party access as defined in the Code of Connection procedures.
3. Stored data: Protect cardholder data against any unauthorised use.
3.1. Never store the following data on any information asset or device.
▪ Track data – that is, the contents of the payment card magnetic stripe. 
▪ CVV or CVC (card verification value or code) – commonly known as the security
code, this is a three or four-digit number usually on the back of the payment card.
▪ PIN (personal identification number) – that the cardholder types into the machine.
▪ PIN block – used to send a new PIN, it is encrypted and includes an authentication
code.
3.2. Don’t display full long card numbers.
▪ Only ever display the card’s first six digits and the last four digits of the permanent
account number (commonly known as the long card number).
▪ Don’t display the full number onscreen unless there’s a need to show it all.
4. Data in transit: Protect cardholder data when transmitting it digitally or transporting it
physically.
4.1. Never send any card details – full long card number, track data, security code, PIN,
PIN block – across or outside the Council IT network using messaging services such as
email and chat, or any other unencrypted or unauthorised system or service.
4.2. If there is a business reason to transmit or transport cardholder data, the appropriate
manager must authorise it first. Use the following safety controls.
▪ Digital – Use a strong encryption mechanism when using email or another digital
system or service. 
▪ Physical – log and inventory the data before leaving the premises. Only use secure
courier services. Monitor the shipment status through to delivery confirmation.
5. Information security incidents: The Information Security Incident Management
Procedure and the Data Protection Breach and Incident Management Protocol explain
how to react to actual and suspected security incidents and data breaches. The
Cardholder Data Breach Incident Response Plan details how to handle incidents involving
cardholder data breaches. This is a restricted access document.
7.4 Physical security
Apply the following physical controls for payment card data and machines to restrict
access to sensitive information and prevent unauthorised individuals from accessing it. This
includes all types of information assets as detailed in the scope of this document.  
Page 246 of 454

Page 247

Payment Card Data Security Policy v2.0  8
1. Only those authorised to do so can handle and distribute information assets that contain
sensitive data. They must do this in a secure manner.
2. Trusted employees must always escort visitors when in areas that hold sensitive
cardholder information.
3. Keep a list of all payment card machines
3.1. including the make, model, location, serial number or other unique identifier, and
3.2. update the list whenever anyone adds, removes or relocates a machine; and
4. Routinely check payment card machine surfaces to detect if they’ve been tampered with
or swapped out with an unauthorised machine for fraudulent purposes.
5. Always check and verify the identity of anyone claiming to be from an authorised third
party who wants to install, replace, repair or run maintenance tasks on, or otherwise
access Council payment card machines.
6. Use lockable storage containers – clearly marked for secure and sensitive disposal – to
store all physical cardholder data awaiting destruction. Restrict access to these containers.
7.5 Third-party supplier and service provider security
The Council uses third-party suppliers and service providers to process card payments,
subject to the following mandatory security controls.
1. The Council must do the following.
1.1. Use established corporate procurement processes, including formal due diligence,
before engaging with a service provider.
1.2. Formally monitor the service provider’s PCI DSS compliance status.
1.3. Keep a list of all third-party suppliers and service providers the Council shares
cardholder data with.
2. Third-party suppliers and service providers the Council contracts to operate on its
behalf by providing services and solutions.
2.1. Are contractually obliged to
▪ comply with PCI-DSS, and
▪ include a specific agreement that they are responsible for cardholder data they
hold.
2.2. Must take a risk-based approach to information and cyber security. They must apply
the following.
▪ Security controls and measures that align with Council security policies,
frameworks, plans, standards, and procedures.
▪ Employee recruitment and human resources policies that are the same or similar
to the Council’s own.
▪ All contractually agreed information security obligations and accountability.  
Page 247 of 454

Page 248

Payment Card Data Security Policy v2.0  9
7.6 Training and awareness
The Information and Cyber Security Policy details how the Council uses training and
awareness to help manage risk. This includes the following.
1. Mandatory training modules on LearnNL covering the core elements of information
governance – data protection, information and cyber security, and records and
Information management.
2. Awareness raising activities to promote information and cyber security, share
information and build knowledge.
3. Specific training on payment card machines for everyone who uses them, including
how to
▪ safely use them,
▪ properly handle cardholder details, and
▪ identify and report suspicious behaviour and possible tampering. 
8 Product set
The table below lists products referenced throughout this document. This may include links to
other file types, websites and IT systems.
▪ Those listed under strategies, policies, frameworks, standards, procedures, guidance, and
related products are Council products.
▪ Those listed under legislation, regulations, and government guidance are the responsibility
of other agencies.
Product type Product
Strategies ▪ Digital and IT Strategy
▪ Risk Management Strategy
Policies ▪ Acceptable Use of IT Policy
▪ Data Protection Policy
▪ Discipline Policy
▪ Information and Cyber Security Policy
▪ Records and Information Management Policy
Frameworks ▪ Security Standards Framework
Standards ▪ Information Classification and Handling Security Standard
Procedures ▪ Code of Connection procedures
▪ Data Protection Breach and Incident Management Protocol
▪ Information Security Incident Management Procedure
Page 248 of 454

Page 249

Payment Card Data Security Policy v2.0  10
Product type Product
Related products ▪ Records retention schedule
▪ Corporate procurement intranet document library 
▪ LearnNL
Legislation,
regulations, and
government
guidance
▪ Computer Misuse Act 1990: GOV.UK
▪ Copyright, Designs and Patents Act 1988: GOV.UK
▪ Cyber Resilient Scotland: strategic framework – Public Sector Action
Plan: GOV.SCOT
▪ Data Protection Act 2018: GOV.UK
▪ General Data Protection Regulations
▪ Government Security Classification Policy: GOV.UK
▪ Government Security Classifications: GOV.UK
▪ Payment Card Industry Data Security Standard: PCI
▪ Payment Card Industry Security Standards Council: PCI
▪ Public Bodies (Joint Working) (Scotland) Act 2014: GOV.UK
▪ Public Records (Scotland) Act 2011: GOV.UK
▪ Public Services Network Connection Compliance: GOV.UK
▪ Strong encryption: PCI  
Page 249 of 454

Page 250

Payment Card Data Security Policy v2.0  11
Appendix A: Payment card data handling
roles and responsibilities
Role Responsibilities
Chief Executive of North Lanarkshire
Council.
▪ Overall accountability for the protection of
information the Council owns and processes.
Chief Officer of Finance and
Technology
The Council’s subject matter expert on
financial systems and solutions.
▪ Overall accountability for protecting financial
data and making sure financial systems,
devices, and processes comply with PCI DSS.
This incorporates the annual PCI attestation
of compliance which includes reviewing
information security policies for currency and
accuracy.
▪ Accountable for putting in place policy,
standards, and guidance in relation to
financial solutions.
Senior Information Risk Owner (SIRO)
The Chief Officer Legal and Democratic
has this role.
▪ Make sure the Council protects both its
information, and its information storage
facilities and processing systems.
▪ Accountable for information and cyber
security governance.
Corporate Management Team
Members are the Chief Executive,
Depute Chief Executive, SIRO, and Chief
Officers.
▪ Sign off on information and cyber security
controls and practices.
▪ Consider reports on the effectiveness of
information and cyber security practices.
PCI DSS Governance Board
A senior officer group with ongoing
responsibility for PCI DSS.
▪ Provide executive management oversight of
Council activities to make sure the Council
complies with PCI DSS.
Data Governance Board
A senior officer group of business
information owners and subject matter
experts from all services. Chaired by the
SIRO.
▪ Assure robust information governance of this
policy.
▪ Consider revisions before passing to the
Policy and Strategy Committee for approval.
Page 250 of 454

Page 251

Payment Card Data Security Policy v2.0  12
Role Responsibilities
Data Management Compliance Group
An officer group from all services with
responsibility for business information
including processes and IT systems.
▪ Individual members must make sure their
service complies with this policy and related
standards, procedures and guidance.
▪ Collectively the team:
▪ oversees the review of this policy; and
▪ agrees revisions before passing to the
Data Governance Board to consider.
Information Risk Manager
Lead subject matter expert on
information and cyber security risk and
assurance.
▪ Co-ordinate and monitor activities to manage
the Council’s information risk posture,
including:
▪ network controls, specialist systems, and
privileged utility programs to protect the
IT infrastructure; and
▪ mandatory training and awareness
raising.
▪ Produce and promote this policy and related
standards, procedures and guidance.
Technology Strategy Manager
Responsible for managing the Council’s
IT infrastructure.
▪ Implement, manage and monitor technical
security measures, in line with appropriate
security standards to protect the Council’s
▪ IT infrastructure,
▪ IT assets, and 
▪ digital information assets managed or
stored by Technology and Digital Strategy
services.
All managers
Anyone responsible for managing a
function or group of people within the
Council. This includes information, IT
asset and product owners.
▪ Make sure processes and security controls
are in place to manage information
effectively.
▪ Make sure staff members:
▪  understand their compliance
responsibilities and the consequences of
non-compliance;
▪ follow policies, standards, procedures and
guidance; and
▪ keep up to date with mandatory training.
Page 251 of 454

Page 252

Payment Card Data Security Policy v2.0  13
Role Responsibilities
Third-party suppliers and service
providers
All third-party organisations and their
individual employees that the Council
contracts to operate on its behalf by
providing services and solutions.
▪ Understand their compliance responsibilities
and the consequences of non-compliance, as
contractually agreed.
Everyone
As per the scope, every person who
processes card payments and or
handles cardholder data on behalf of
the Council.
▪ Follow policies, standards, procedures and
guidance, and process card payments and
protect cardholder data in line with them.
▪ Keep up to date with:
▪ mandatory training; and 
▪ general awareness communications. 
Page 252 of 454

Page 253

INFORMATION AND
CYBER SECURITY POLICY
VERSION 5.0, MARCH 2026 
Page 253 of 454

Page 254

Information and Cyber Security Policy v5.0  
Document control
Title Information and Cyber Security Policy
Owner Chief Officer 
(Legal and Democratic)
Contact InformationRiskAndAssuranceTeam
@northlan.gov.uk
Governance group Data Governance Board
Author Information Compliance Officer Contact InformationRiskAndAssuranceTeam
@northlan.gov.uk 
Revision history
Number Originator Date review commenced Revision description/record of change
5.0 Information Risk Manager 14 February 2025 Two-yearly review and change of
writing style from second to third
person.
4.0 Information Risk Manager 03 May 2023 Two-yearly review and plain English
changes.
3.0 Information Risk Manager 09 March 2021 Review with aim of deprecating
Information Risk and Information
Classification and Handling policies.
2.1 Information Risk Manager 18 February 2021 Reviewed as part of review of all
information governance policies and
guidelines.
2.0 Information Risk Manager 28 April 2020 Regular review including comments
from Data Governance Board and
Data Management Team. 
Document approvals
Number Governance group Date approval granted Date approval to be requested
(if document still draft)
5.0 Policy and Strategy Committee  19 March 2026
4.0 Policy and Strategy Committee 08 June 2023 
3.0 Policy and Strategy Committee 03 June 2021 
2.0 Policy and Strategy Committee 11 June 2020 
1.3 Policy and Resources Committee 21 June 2017 
1.2 Policy and Resources Committee 16 September 2014 
1.1 Policy and Resources Committee 14 March 2013 
Consultation record (for most recent update)
Status of document consulted upon Stakeholders consulted between 11 March 2025 and
22 December 2025.
Stakeholders consulted and dates Data Management Team
Technology Strategy Manager
Data Governance Board
Corporate Management Team
11 March 2025
11 March 2025
26 March 2025
22 December 2025 
Strategic alignment
Plan for North Lanarkshire
Improving North Lanarkshire’s resource base – Build a workforce for the future capable of delivering on
our priorities and shared ambition.
Page 254 of 454

Page 255

Information and Cyber Security Policy v5.0  
Strategic alignment (continued)
Digital and IT Strategy
The Digital and IT Strategy is critical to enabling the Council to deliver on its vision. It sets the standards
and provides the direction for the strategies, policies, and plans which enable the delivery of critical
public services, business as usual activities and the investment programmes of work. 
The Information and Cyber Security Policy is one of these. It supports the strategy by providing a safe
framework for using Council information, and information storage facilities and processing systems
without exposing the Council or its users to unacceptable risks. 
Next review date
Review date March 2028 
Page 255 of 454

Page 256

Information and Cyber Security Policy v5.0  
Contents
1 Introduction ...................................................................................................................................... 1
2 Purpose ............................................................................................................................................. 2
3 Scope.................................................................................................................................................. 3
4 Governance ....................................................................................................................................... 3
5 Policy compliance............................................................................................................................. 4
6 Policy objectives ............................................................................................................................... 5
7 Security controls............................................................................................................................... 6
7.1 Managing risk ......................................................................................................................... 6
7.2 Managing information .......................................................................................................... 6
7.3 Operational security .............................................................................................................. 7
7.4 Cyber security ......................................................................................................................... 8
7.5 Third-party supplier and service provider security ........................................................... 9
7.6 Training and awareness ...................................................................................................... 10
8 Product set ...................................................................................................................................... 11
Appendix A: Information and cyber security roles and responsibilities ....................................... 13
Appendix B: Cyber Security Framework core functions and categories ....................................... 15 
Page 256 of 454

Page 257

Information and Cyber Security Policy v5.0  1
1 Introduction
Information is a critical asset. North Lanarkshire Council
(the Council) relies on physical and information technology
(IT) assets to use, store, manage, process, and share
information.
This policy sets out how the Council – and anyone who operates on its behalf to deliver or
supply services – manages, secures and protects its information. This allows the Council to
continue to deliver services, carry out statutory duties, and support internal business
functions. It covers the following.
1. Physical access to electronic and paper-based information assets including Council and
other buildings where it conducts business, or third parties operate on its behalf.
2. Logical access to electronic information, and IT systems and services, both hosted within
the Council IT network and cloud-based – including laptops and mobile phones, business
and communications systems, office software, databases, websites, and apps.
3. Network infrastructure and services including hardware and software, both within the
Council network and through cloud managed services – including routers, switches,
firewalls, servers, and monitoring and management tools.
4. Legislation governing data and IT systems, both corporate and business function specific.
5. Compliance requirements and standards set out by government and regulatory bodies.
6. Privacy rights of the Council’s customers, service users, employees and other authorised
IT users.
7. Managing information and cyber security threats to information in all formats and all
the Council’s IT assets, including networks, systems and devices.
8. Third-party supplier and service provider security, particularly where third parties hold
or process the Council’s information on its behalf. 
The Council owns all information it stores. It securely manages this along with
the devices, systems, and services it uses to create, store, access and process it. 
Information security: Measures to protect information in all formats – digital, physical,
and spoken – from unauthorised or unintended access, disclosure, use, or destruction.
Cyber security: Measures to protect IT assets and digital information from cyber attacks,
which the National Cyber Security Centre (NCSC) defines as:
“attempt[s] to damage, disrupt or gain unauthorised
access to computer systems, networks or devices.”
As the Council takes a digital by default approach to service delivery and much of its
information is now in digital format, this is a critical branch of its information governance
approach.
Page 257 of 454

Page 258

Information and Cyber Security Policy v5.0  2
2 Purpose
This policy provides a framework to effectively manage
information and cyber security, helping to protect
Council information from theft, loss, and unauthorised
access or disclosure.
It balances the benefits and risks of processing information, in line with the three core
principles of information security – known as the CIA triad.
Confidentiality
Only those who should see it, do see it.
Integrity
Information is correct and kept up to date, and
only used for its intended purpose.
Availability
Authorised users have access to information
when they need it.
This policy defines the security measures designed to protect and minimise threats to all
three elements of the CIA triad for information at the OFFICIAL tier, as per the UK
Government’s Security Classification Policy. It is a corporate risk control factor and aligns with
the following.
▪ Digital and IT Strategy – this brings together separate but related plans and policies,
including this one, that contribute to the Council’s digital vision. 
▪ Its sister policies that help secure information.
▪ Data Protection
▪ Payment Card Data Security
▪ Records and Information Management
▪ Acceptable Use of IT Policy – this informs the Council’s IT users on how to appropriately
use IT assets to access, store and process information.
▪ Codes of conduct that set out mandatory standards for Councillors, Chief Officers, and
Employees, in particular relating to privacy and confidentiality.
▪ Any third-party supplier or service provider contractual compliance obligations.
▪ Legislative and regulatory compliance obligations and guidance. This includes:
▪ Computer Misuse Act 1990
▪ Copyright, Designs and Patents Act 1988
▪ Cyber Resilient Scotland: strategic framework – Public Sector Action Plan 
CIA triad
Availability
Confidentiality
Integrity
Page 258 of 454

Page 259

Information and Cyber Security Policy v5.0  3
▪ Data Protection Act 2018
▪ General Data Protection Regulations
▪ Government Security Classifications
▪ Payment Card Industry Data Security Standard
▪ Public Bodies (Joint Working) (Scotland) Act 2014
▪ Public Records (Scotland) Act 2011
▪ Public Services Network Connection Compliance
3 Scope
This policy applies to all aspects of information and cyber security, including the following.
1. All IT assets – systems, services, and devices – that the Council uses to store, process,
transmit or receive information – including how it specifies, designs, develops, installs,
operates, connects, uses, and decommissions them.
2. All information assets – data, files, documents, records and knowledge – that it creates or
receives from third parties, stores and processes in the following formats.
▪ Digital: IT and communication systems containing data, records, and digital files – such
as documents, audio, video, images - hosted within the Council IT network and on
cloud-based services; or stored on removable media.
▪ Paper: Printed or handwritten, stored in Council and authorised third-party locations.
▪ Spoken: Two or more people communicating by talking or using sign language – in
person, over the phone, in online meetings – including using interpreters for signing
and spoken languages other than English. One way communication using technology
that supports dictation and read aloud functionality.
3. Every authorised person who creates, accesses, processes, and otherwise uses
information on the Council’s behalf or in an official capacity – both IT and non-IT users.
This includes all employees, elected members, contractors, consultants, third-party
suppliers and service providers, temporary agency staff, modern apprentices, students,
volunteers, and anyone else with authorised access.
4 Governance
The Policy and Strategy Committee has approval authority for, and oversight of, this policy. 
The Data Management and Compliance Group (formerly Data Management Team) then the
Data Governance Board – as key stakeholders – oversee its review and consider its
contents before referring it on for approval. 
The Chief Officer of Legal and Democratic – as the Council’s Senior Information Risk Owner
– is accountable for its governance.  
Page 259 of 454

Page 260

Information and Cyber Security Policy v5.0  4
The Information Risk and Assurance team is responsible for the following activities.
1. Produce, publish, and promote this policy.
2. Give instructions and guidance on how to apply and comply with this policy through
frameworks, standards, procedures, and guidance – see product set for list and links.
3. Review every two years, with other reviews when needed. For example, following a critical
security incident, new legislation, a significant threat, or an audit action.
4. Report to management teams, governance and working groups, committees, and scrutiny
panels.
5 Policy compliance
Every person with access to Council information and
who uses it while working on behalf of the Council or
in an official capacity, must comply with this policy,
and all the policies, standards, procedures, and
guidance it references.
This includes:
1. only using Council information for its intended purpose – unless otherwise authorised; 
2. maintaining its confidentiality and integrity;
3. keeping it safe; and
4. only using Council managed devices to access Council information and systems, and
conduct Council business – subject to limited exceptions detailed in the Acceptable Use of
IT Policy and excluding third parties delivering services on its behalf as defined in
individual contracts.
Appendix A describes the roles and responsibilities of the following key people and groups in
supporting, promoting, and complying with this policy.
▪ Chief Executive
▪ Data Governance Board
▪ Senior Information Risk Owner
▪ Technology Strategy Manager
▪ Third-party suppliers and service providers 
▪ Corporate Management Team
▪ Data Management and Compliance Group
▪ Information Risk Manager
▪ All Managers 
▪ Everyone in the scope of this policy. 
Page 260 of 454

Page 261

Information and Cyber Security Policy v5.0  5
6 Policy objectives
This policy sets the Council’s strategic position and
lays the foundations for effective information and
cyber security.
Its key objectives are as follow.
1. Show clear executive-level understanding of the value of information and the need to
make resources available to protect it.
2. Show key stakeholders – such as elected members, residents, customers and service users
– that the Council treats and protects information in line with its value and sensitivity.
3. Help everyone who accesses or processes Council information to understand:
a. why they must protect its confidentiality, integrity, and availability;
b. the controls it uses to protect this information; and
c. their role in this.
4. Make sure third-party suppliers and service providers:
a. understand – at an organisational and individual level – their responsibilities and
contractual obligations in relation to all relevant security measures; and
b. can demonstrate their compliance with Council policies, standards and procedures.
5. Provide a framework for security plans, standards, procedures, and guidance – to protect
its information, systems, devices and processes.
6. Promote compliance with all legislation and regulations governing its information assets.
7. Maximise the benefits of its information whilst identifying and managing associated
information and cyber risks.  
Important note regarding the acceptable use of IT
Everyone must understand that – in line with the Acceptable Use of IT Policy – the Council:
▪ routinely carries out a range monitoring activities of its IT assets for compliance,
security, operational, performance, and maintenance purposes;
▪ reserves the right to formally investigate individual usage – by exception and under
strict controls – to help identify potential prohibited use or misuse, as per the Discipline
Policy; and
▪ will refer any suspected unlawful acts to the appropriate authorities – this includes the
police, and professional and regulatory bodies.
Page 261 of 454

Page 262

Information and Cyber Security Policy v5.0  6
7 Security controls
7.1 Managing risk
Managing risk is critical to keeping information secure. This process includes –
▪ Identifying, assessing, and monitoring risks to information, and information processing
systems and storage facilities.
▪ Preventative mitigations and response planning to manage threats to information and IT
assets. These threats include human error, public infrastructure damage or failure, cyber
attacks, malicious and unwanted email, social engineering, supply chain security threats,
and insider threats.
The Council does the following to manage information risks.
1. Uses network controls, specialist systems and privileged utility programs to protect its IT
infrastructure.
2. Produces and promotes information management policies.
3. Produces and promotes security standards, as per its Security Standards Framework. Each
standard contains specific minimum security measures.
4. Develops and implement security operational procedures and user guidance.
5. Produces mandatory training for employees and delivers awareness sessions, as needed.
6. Routinely raises awareness about information security, both generally and topic specific.
This includes issuing alerts and guidance about specific threats, as they occur.
7. Agrees specific information and cyber risk treatment plans – and invokes them when it
needs to – in line with the Risk Management Strategy.
7.2 Managing information
This policy – and related Data Protection, Payment Card Data Security, and Records and
Information Management policies – define how the Council manages and uses
information. It has a range of supporting products, relating to specific elements of this. In
particular –
1. Information classification and handling: The Information Classification and Handling
Security Standard helps everyone:
▪ understand the different classes of information and what to use them for;
▪ decide which classification to use for an information asset, based on the sensitivity and
confidentiality of its content; and
▪ know how to protectively mark and handle information based on its classification. 
2. Records retention: The Records Retention Schedule specifies
▪ how long to keep information, and
▪ whether to dispose of, archive or permanently preserve it. 
Page 262 of 454

Page 263

Information and Cyber Security Policy v5.0  7
3. Information assets: The Information Asset Register details all current information assets
held on record. It includes the following for each:
▪ asset reference, name and description;
▪ owner, administrator, service and business unit;
▪ classification and whether it contains personal information;
▪ any legislative basis for processing the information; and
▪ format (paper or digital) and reuse status. 
7.3 Operational security
Information is at the core of all Council operational activities. Procedures and controls
securely manage every stage of its lifecycle – covering how to create, store, use, share, and
destroy or retain information. 
Key operational activities include the following.
1. Compliance: Legislation and regulations, data sharing arrangements and contractual
obligations.
2. People resources procedures: Recruitment, disclosure and other vetting processes. 
User guidance to help manage information securely
Guidance on the intranet covers specific topics including –
▪ Email security
▪ IT authentication (password) and secure access
▪ Information handling rules
▪ Remote working security
▪ SCAM checklist
Page 263 of 454

Page 264

Information and Cyber Security Policy v5.0  8
3. Access control: How to control access to information and systems. This comprises the
following.
3.1. User access including identity and access management, provisioning, privileged
access management, passwords and other authenticators, and user authentication
and secure access responsibilities.
3.2. Device access including Council and personal devices.
3.3.  Access to IT systems and services including system controls to protect against
unauthorised access, service disruption, data breach and data loss.
3.4. Access to network infrastructure and services including network controls and
procedures, and privileged utility programs.
3.5. Access to electronic information using permissions, privileges, and cryptography,
depending on the information sensitivity.
3.6. Third party access as defined in Code of Connection procedures.
4. IT operational controls: This includes products and procedures to manage change,
protect and manage the Council IT network infrastructure, introduce, and decommission
systems, and replace and dispose of hardware.
5. Information security incidents: The Information Security Incident Management
Procedure and the Data Protection Breach and Incident Management Protocol explain
how to respond to actual and suspected security incidents.
6. Business continuity: The Business Continuity Guidance explains the provisions in place
as part of the resilience function. This includes a corporate business continuity plan and
service level plans, business continuity champions, and testing and review arrangements.
7. Disaster recovery: The IT Systems Resiliency and Disaster Recovery Standard classifies IT
systems in terms of how critical they are to service delivery and business continuity.
8. Third-party procurement: The Corporate Procurement model includes governance
arrangements, procedures for engaging with suppliers and service providers, and
procurement toolkits and templates. The Purchasing Cloud-Services: Cyber Security
Procedure explains the processes to evaluate third-party supplier and service provider
security when buying and commissioning cloud-based IT solutions.
9. Project management controls: The Project Management Framework includes records
management, data protection and information security guidance for its product set 
7.4 Cyber security
Technical security measures align to the NIST Cyber Security Framework (CSF). This is a
taxonomy of high-level cyber security outcomes that help manage cyber security risks. Its
core components are a hierarchy of functions, categories, and subcategories that detail each
outcome. The Council uses the CSF for the following reasons.
1. It meets the requirements of Enterprise Architecture Business Principle 2 – Reuse before
buy, before build. 
Page 264 of 454

Page 265

Information and Cyber Security Policy v5.0  9
2. It is an internationally adopted common and open framework.
a. Its open nature means it’s usable without the need for extensive resources, continual
certification, or costly audits.
b. The outcomes are sector, country, and technology-neutral, giving the flexibility to tailor
it to suit the Council’s specific needs in terms of risks, technologies, and priorities. 
c. It is outcomes-based, focusing on what the Council needs to achieve, not how to do it.
d. It has a strong emphasis on governance, which aligns with the Council’s strategic
vision, information governance policies and compliance obligations – as set out in the
introduction of this document.
3. It provides reporting advantages.
a. The security outcomes are easy to understand for a broad audience, regardless of
their cyber security expertise.
b. It’s measurable against a range of security frameworks as required.
The CSF comprises the following core functions and each of these contains a series of related
categories listed in Appendix B.
Govern:
Establish, communicate, and monitor cyber security risk management strategy, expectations,
and policy.
Identify:
Understand current cyber security risks.
Protect:
Safeguards to manage cyber security risks.
Detect:
Find and analyse possible cyber security attacks
and compromises.
Respond:
Actions regarding a detected cyber security
incident. 
Recover:
Restore assets and operations affected by a cyber security incident. 
7.5 Third-party supplier and service provider security
The Digital and IT Strategy sets out a vision for a Digital North Lanarkshire, including taking
a cloud first approach to IT solutions, in the following order of preference.
1. Software as a Service (SaaS)
2. Platform as a Service (PaaS)
3. Infrastructure as a Service (IaaS)  
Page 265 of 454

Page 266

Information and Cyber Security Policy v5.0  10
All third parties the Council contracts with to operate on its behalf by providing services and
solutions must take a risk-based approach to information and cyber security. They must apply
the following.
▪ Security controls and measures that align with Council security policies, frameworks,
plans, standards, and procedures.
▪ Employee recruitment and human resources policies that are the same or similar to the
Council’s own.
▪ All contractually agreed information security obligations and accountability.
7.6 Training and awareness
Training and awareness both help manage information risk. By giving people the
knowledge and confidence they need to carry out their information and cyber security
responsibilities, this helps change behaviours to further protect information and systems.
A series of mandatory training courses on LearnNL cover the core elements of information
governance – data protection, information and cyber security, and records and information
management. Employees must complete these courses every two years to keep up to date
with any changes in policy or legislation.
The Council carries out a range of awareness raising activities using different types of media
and systems to promote information and cyber security, share information and build
knowledge. This is generally aimed at everyone but may also target specific audiences.
Awareness raising
Activities: To maintain a constant flow of content to keep everyone involved and informed.
Examples include the following.
▪ Routinely sharing information, both general and topic specific.
▪ Promoting events and campaigns such as Cyber Security Week.
▪ Conducting regular phishing simulation exercises to train users in detecting and
reporting scam messages, to mitigate the risk of a successful phishing attack.
▪ Issuing alerts and guidance about specific threats, as they occur – for example, a new
phishing scam designed to steal information.
▪ Engaging directly through the Information and Cyber Security Viva Engage community,
including answering questions, asking for opinions, and linking to other useful content.
▪ Notifying users of policy changes, new standards, procedures and guidance.
▪ Delivering general or topic-specific awareness sessions. These may target particular
groups such as elected members, senior managers, or an individual functional area.
Media: Including the following.
▪ Viva Engage community page
▪ Intranet document libraries
▪ Staff announcement emails
▪ Council news on the intranet 
▪ Email phishing simulator software
▪ Chief Executive’s newsletter
▪ Popup notifications on Council devices
▪ PowerPoint presentations  
Page 266 of 454

Page 267

Information and Cyber Security Policy v5.0  11
8 Product set
The table below lists products referenced throughout this document. This may include links to
other file types, websites and IT systems.
▪ Those listed under strategies, policies, frameworks, standards, procedures, guidance, and
related products are Council products.
▪ Those listed under legislation, regulations, and government guidance are the responsibility
of other agencies.
Product type Product
Strategies ▪ Digital and IT Strategy
▪ Risk Management Strategy
Policies ▪ Acceptable Use of IT Policy
▪ Data Protection Policy
▪ Discipline Policy
▪ Payment Card Data Security Policy
▪ Records and Information Management Policy
Frameworks ▪ Corporate Procurement model
▪ Project Management Framework
▪ Security Standards Framework
Standards ▪ Code of Conduct for Chief Officers
▪ Employee Code of Conduct
▪ IT Systems Resiliency and Disaster Recovery Standard
▪ Information Classification and Handling Security Standard
Procedures ▪ Code of Connection procedures
▪ Data Protection Breach and Incident Management Protocol
▪ Information Security Incident Management Procedure
Guidance ▪ Business continuity guidance
▪ Email security guidance
▪ Intranet document library
▪ IT Authentication (Password) and Secure Access User Guidance
▪ Purchasing Cloud-based Services Cyber Security Guidance
▪ Quick guide to information handling rules
▪ Quick guide to remote working security
▪ SCAM checklist
▪ Viva Engage community page
Page 267 of 454

Page 268

Information and Cyber Security Policy v5.0  12
Product type Product
Related products ▪ Council news on the intranet
▪ Information Asset Register
▪ LearnNL
▪ Records Retention Schedule
Legislation,
regulations, and
government
guidance 
▪ Computer Misuse Act 1990: GOV.UK
▪ Copyright, Designs and Patents Act 1988: GOV.UK
▪ Councillors’ Code of Conduct
▪ Cyber Resilient Scotland: strategic framework – Public Sector Action
Plan: GOV.SCOT
▪ Cyber Security Framework: NIST
▪ Data Protection Act 2018: GOV.UK
▪ General Data Protection Regulations
▪ Government Security Classifications: GOV.UK
▪ Government Security Classification Policy: GOV.UK
▪ Public Bodies (Joint Working) (Scotland) Act 2014: GOV.UK
▪ Public Records (Scotland) Act 2011: GOV.UK
▪ Payment Card Industry Data Security Standard: PCI
▪ Public Services Network Connection Compliance: GOV.UK  
Page 268 of 454

Page 269

Information and Cyber Security Policy v5.0  13
Appendix A: Information and cyber
security roles and responsibilities
Role Responsibilities
Chief Executive of North Lanarkshire
Council.
▪ Overall accountability for the protection of
information the Council owns and processes.
Senior Information Risk Owner (SIRO)
The Chief Officer of Legal and
Democratic has this role.
▪ Make sure the Council protects both its
information, and its information storage
facilities and processing systems.
▪ Accountable for information and cyber
security governance.
Corporate Management Team
Members are the Chief Executive,
Depute Chief Executive, SIRO, and Chief
Officers.
▪ Sign off on information and cyber security
controls and practices.
▪ Consider reports on the effectiveness of
information and cyber security practices.
Data Governance Board
A senior officer group of business
information owners and subject matter
experts from all services. Chaired by the
SIRO.
▪ Assure robust information governance of this
policy.
▪ Consider revisions before passing to the
Policy and Strategy Committee for approval.
Data Management and Compliance
Group
An officer group from all services with
responsibility for business information
including processes and IT systems.
▪ Individual members must make sure their
service complies with this policy and related
standards, procedures and guidance.
▪ Collectively the group:
▪ oversees the review of this policy; and
▪ agrees revisions before passing to the
Data Governance Board to consider.
Information Risk Manager
Lead subject matter expert on
information and cyber security risk and
assurance management.
▪ Co-ordinate and monitor activities to manage
the Council’s information risk posture,
including:
▪ network controls, specialist systems, and
privileged utility programs to protect the
IT infrastructure; and
▪ mandatory training and awareness
raising.
▪ Produce and promote this policy and related
standards, procedures and guidance.
Page 269 of 454

Page 270

Information and Cyber Security Policy v5.0  14
Role Responsibilities
Technology Strategy Manager
Responsible for managing the Council IT
infrastructure.
▪ Implement, manage and monitor technical
security measures, in line with appropriate
security standards to protect the Council’s
▪ IT infrastructure,
▪ IT assets, and 
▪ digital information assets managed or
stored by Technology and Digital Strategy
services.
All managers
Anyone responsible for managing a
function or group of people within the
Council. This includes information, IT
asset and product owners.
▪ Make sure processes and security controls
are in place to manage information
effectively.
▪ Make sure staff members:
▪ understand their compliance
responsibilities and the consequences of
non-compliance;
▪ follow policies, standards, procedures
and guidance; and
▪ keep up to date with mandatory training.
Third-party suppliers and service
providers
All third-party organisations and their
individual employees that the Council
contracts to operate on its behalf by
providing services and solutions.
▪ Understand their compliance responsibilities
and the consequences of non-compliance, as
contractually agreed.
Everyone
As per the scope, every person who
creates, accesses, processes and
otherwise uses information on behalf of
the Council or in an official capacity –
both IT and non-IT users.
▪ Follow policies, standards, procedures and
guidance, and protect Council information,
devices, information storage facilities and
processing systems in line with them.
▪ Keep up to date with:
▪ mandatory training; and 
▪ general awareness communications.  
Page 270 of 454

Page 271

Information and Cyber Security Policy v5.0  15
Appendix B: Cyber Security Framework
core functions and categories
Extracted from the NIST Cyber Security Framework
Function Category NIST ID
Govern  Organisational context
 Risk management strategy
 Roles, responsibilities and authorities
 Policy
 Oversight
 Cybersecurity supply chain risk management
GV.OC
GV.RM
GV.RR
GV.PO
GV.OV
GV.SC
Identify  Asset management
 Risk assessment
 Improvement
ID.AM
ID.RA
ID.IM
Protect  Identity Management, authentication, and access control
 Awareness and training
 Data security
 Platform security
 Technology infrastructure resilience
PR.AA
PR.AT
PR.DS
PR.PS
PR.IR
Detect  Continuous monitoring
 Adverse event analysis
DE.CM
DE.AE
Respond  Incident management
 Incident analysis
 Incident response reporting and communication
 Incident mitigation
RS.MA
RS.AN
RS.CO
RS.MI
Recover  Incident recovery plan execution
 Incident recovery communication
RC.RP
RC.CO 
Page 271 of 454

Page 272

This is a controlled document. The digital PDF file published on InsideNL is the
control copy.
▪ Always access this document from the control location.
▪ When you open this document, your device may automatically download it.
If it does, you should still open it from the control location in future.
▪ You can print this document, but a printed copy isn’t the control copy.
▪ Don’t save any digital copies of this document anywhere. This includes your
device, USB flash drives, network drives, OneDrive, Teams/SharePoint, or
any other digital storage device, system, service, or location. 
Records and
Information
Management
Policy
Version 6.0, 05 November 2025 
Page 272 of 454

Page 273

Records and Information Management Policy v6.0 
Document control
Title Records and Information Management Policy
Governance group Data Governance Board
Owner Rachel Blair, Senior Information Risk Officer Contact Blairr@northlan.gov.uk
Author Fiona Hughes, Corporate Records Manager Contact hughesfi@northlan.gov.uk 
Revision history
Version Originator Review start date Revision description and record of change
6.0 Fiona Hughes 21 July 2025 Bi-annual review.
5.0 Fiona Hughes  Bi-annual review.
4.0 Fiona Hughes 26 March 2021 Full review.
3.0 Fiona Hughes 15 January 2019 Bi-annual review.
2.0 Fiona Hughes 15 November 2016 Bi-annual review process. Revised in line with
Records Management Plan.
1.0 Marcia Jarnell 25 July 2014 Combination of Record Management and
Information Management policies. 
Document approvals
Version Governance group Date approved Date approval requested
(if document still in draft)
6.0   05 Nov 2025
5.0 Business and Digital Delivery Board 08 June 2023 
4.0 Policy and Strategy Committee 03 June 2021 
3.0 Policy and Strategy Committee 10 June 2020 
2.0 Policy and Resources Committee 21 June 2017 
1.0 Policy and Resources Committee 18 September 2014 
Consultation record (for most recent update)
Consultation status Stakeholders consulted between 21 October 2025 and 05 November 2025
Stakeholders
consulted and dates
Data Management & Compliance Group 21 October 2025 
Strategic alignment
Plan for North Lanarkshire
Improving the Council’s Resource Base – A Workforce Strategy that is built around the needs of the
Council (as a single resource base) to deliver the priority outcomes, ensuring future workforce
requirements, new skills and innovative approaches, and succession planning are recognised.
Digital and IT Strategy
The Digital and IT Strategy brings together separate but related plans and policies that contribute to
the development and delivery of our digital vision. The Records and Information Management Policy
is one of these. It supports the strategy by providing a framework for good record keeping practices
making sure records are managed effectively and efficiently, and the Council complies with its
statutory and regulatory obligations. 
Next review date
Review Date 01 May 2027
Page 273 of 454

Page 274

Records and Information Management Policy v6.0 
Contents
1. Introduction ........................................................................................................... 4
2. Purpose ................................................................................................................. 4
3. Scope .................................................................................................................... 5
4. Governance ............................................................................................................ 5
5. Objectives .............................................................................................................. 5
6. Records and information lifecycle management .......................................................... 6
7. Capture and control of records ................................................................................. 6
8. Storage of records ................................................................................................... 8
9. Access to records ..................................................................................................... 8
10. Audit trail ............................................................................................................... 8
11. Retention and disposal ............................................................................................ 9
12. Transfer to archive .................................................................................................. 9
13. Destructions ........................................................................................................ 10
14. Responsibilities .................................................................................................... 10
15. Product set........................................................................................................... 11
Appendix 1: Glossary of terms ....................................................................................... 12
Page 274 of 454

Page 275

Records and Information Management Policy v6.0 4 
1. Introduction
Information and records are an essential corporate
asset without which we would be unable to carry out
our functions, activities and transactions, meet the
needs of our stakeholders, provide evidence of our
activities and ensure legislative compliance.
Records management is the systematic control of an organisation’s records, throughout
their lifecycle, to meet operational business needs, statutory and fiscal requirements and
community expectations.
The benefits of implementing records management systems and processes include:
1. Improved business efficiency through reduced time spent searching for information;
2. demonstration of transparency and accountability for all actions;
3. the maintenance of corporate memory and evidence of Council business and decision-
making;
4. the creation of modern working environments and identification of opportunities for office
rationalisation and hybrid working;
5. risk management in terms of ensuring and demonstrating compliance with all legal,
regulatory and statutory obligations, and
6. the meeting of stakeholder expectations through the provision of good quality services. 
North Lanarkshire Council recognises the importance of effective records management
in supporting its core functions, providing authentic and reliable evidence of Council
business, and documenting historical and cultural activity within North Lanarkshire. 
2. Purpose
This policy demonstrates that the Council considers records and information to be a vital
corporate asset and is committed to managing them lawfully and in compliance with current
standards of professional practice. It acts as a mandate for the support and delivery of
records management guidance, training, procedures and initiatives across the organisation.
The Public Records (Scotland) Act 2011 requires the Council to produce a Records
Management Plan which sets out its proper arrangements for the effective management of all
public records. The act defines public records as records created by, on behalf of, or in the
possession of, the authority or a contractor, in carrying out the functions of the Council.
Having a records management policy statement fulfils one of the mandatory elements of this
plan.
Page 275 of 454

Page 276

Records and Information Management Policy v6.0 5 
3. Scope
This policy is applicable to all records created or managed by North Lanarkshire Council and
North Lanarkshire Licensing Board for the purpose of performing Council functions, and
applies to Council records in all formats, whether accessed on Council premises or via mobile
or home-working equipment. It also applies to records managed on Council systems on
behalf of North Lanarkshire Integration Joint Board.
The policy applies to all staff, workers, elected members, clients, suppliers, third party
contractors and any other individuals or organisations who carry out functions on behalf of
the Council. 
4. Governance 
This policy forms part of a suite of documents that form part of the Digital and IT Strategy.
The Business and Digital Delivery Board has approval authority for, and oversight of, this
policy. The Data Management Compliance Group – as key stakeholders – oversee its
review and consider its contents before referring it on for approval. The Chief Officer of
Legal and Democratic – as the Council's Senior Information Risk Owner – is accountable for
its governance. The Records and Archives team is responsible for the following activities:
1. Produce, publish and promote this policy. Provide guidance on how to apply and comply
with this policy through standards, procedures and guidance notes as referred to within
the policy.
2. Review every two years, with other reviews when needed. For example, following new
legislation, new guidance or an audit action.
3. Report to management teams, governance and working groups, committees and scrutiny
panels. 
5. Objectives 
The objectives of this policy are to:
▪ Provide a framework for good record keeping practices within the Council, ensuring that
records are managed effectively and efficiently, and that the Council complies with its
statutory and regulatory obligations.
▪ Develop and encourage a working culture that recognises and acknowledges the benefits
of effective records management.
▪ Ensure a corporate approach to the management of the Council's records as a corporate
resource.
▪ Define responsibilities for records management throughout the Council.
▪ Ensure that Council records are reliable, authentic and have integrity.
Page 276 of 454

Page 277

Records and Information Management Policy v6.0 6 
▪ Ensure that records are retrievable as required but also secure to prevent unauthorised
access, alteration or destruction.
▪ Ensure lawful management of records that include personal data. Support public
rights of access to information. Ensure that records of long-term value are identified
and preserved as archives within the collections of the Council. 
6. Records and information lifecycle
management
The lifecycle of a record comprises the following:
▪ initial creation by the Council or receipt from a third party;
▪ maintenance and use, including sharing and audit; and
▪ disposal through confidential destruction or preservation in the Council’s archive. 
Figure 1: Information lifecycle 
7. Capture and control of records
The Council uses a variety of systems to manage its
records. These systems, regardless of the format of
the records, must be designed to ensure that
records are saved, stored, organised and managed
effectively and efficiently.
Page 277 of 454

Page 278

Records and Information Management Policy v6.0 7 
The Council is committed to using appropriate systems to manage its structured records e.g.
line of business systems or corporate records stores. Unstructured, electronic records will
primarily be stored within M365 and managed with records management software (Avepoint
Opus). This supports appropriate information sharing, aids search and retrieval processes and
reduces the unnecessary duplication of records.
Page 278 of 454

Page 279

Records and Information Management Policy v6.0 8 
The corporate file plan and Records Retention Schedule will be applied to records when they
are stored, created, or documented in M365. All documents and folders should be given
names and metadata that facilitate meaningful use according to the Council’s Naming
Standards. 
8. Storage of records
Staff are encouraged to save in electronic format where appropriate for reasons of
improved security, functionality and efficiency. Records should be stored on media that
ensures that they can be retained and are accessible for as long as they are required, which in
some cases is in perpetuity. Paper records held locally in offices should be locked away
securely when not in use.
The Council has adopted the use of M365, particularly MS Teams and MS SharePoint for
storing unstructured records. All Teams and SharePoint sites are allocated a function in the
Council’s file plan and staff should use the allocated sites for these records. Using unofficial
storage areas, such as OneDrive, for records that should be managed under the file plan and
Records Retention Schedule, will undermine efforts to effectively manage this corporate asset
and puts the Council at risk of non-compliance with relevant legislation.
The Council operates a records management service for semi-current and non-current
physical records, allowing services to store and access records off-site when they are not
required for business use on a daily or weekly basis. This service manages intake of records,
storage, destructions and transfers to archive, in line with the corporate Records Retention
Schedule.
Service managers should ensure that they have a contingency or business continuity plan
to provide protection for records which are vital to the continued functioning of the Council,
in the event of a system outage or records being inaccessible because of e.g. fire or flood. The
requirements are outlined in more detail in the Vital Records Guidance. 
9. Access to records
Appropriate procedures and processes should be put in place to ensure the physical,
electronic and intellectual security of Council records. This facilitates the Council's ability to
respond to requests for information under, for example, data protection and freedom of
information legislation.
Access to information is governed by the statutory and regulatory framework within which the
Council operates, and the business needs and requirements of the Council. Staff must comply
with the relevant information policies, processes and procedures to protect records from
unauthorised access. 
10. Audit trail
An audit trail allows records to be tracked effectively, deters unauthorised access and can
provide a method of monitoring changes to a document.
Page 279 of 454

Page 280

Records and Information Management Policy v6.0 9 
▪ The Council has demonstrated its commitment to tracking and monitoring records by
migrating its unstructured records away from on-premises, network drives onto M365
which track all interactions with records automatically.
▪ Physical records held in two corporate records management stores, and the archives
repository are tracked using Avepoint Opus.
11. Retention and disposal
There are substantial financial, legislative, and reputational risks associated with keeping
records for too short or too long a time period. Retaining records for the correct period
ensures compliance with a range of legislative requirements and promotes efficient
information management. This is of particular significance for records containing personal
data.
A corporate Records Retention Schedule enables staff to make informed decisions about
retention and disposal of records across the Council and its partner organisations. The
Records Retention Schedule is maintained and updated regularly by the Corporate Records
Manager and the most up-to-date version is on the Council’s website.
At the end of a record’s disposal period, the disposal actions will be to:
▪ destroy,
▪ review for business value, or
▪ transfer to the archive.
The Records Retention Schedule only applies to master records. Duplicate, local or
convenience copies should be destroyed as soon as they are no longer required. Short-lived
documents such as telephone messages, meeting notes etc. should be transferred to a more
formal document and saved as a record if they contain business critical information.
The Council acknowledges that there will be occasions when records cannot be destroyed in-
line with the Records Retention Schedule because of legal proceedings or information
requests. 
12. Transfer to archive
North Lanarkshire Archives exists to collect,
preserve and make available to the public the
historical records of North Lanarkshire Council and
its predecessor administrations. Its role is to
maintain a traceable and uninterrupted line of care,
control and possession of the Council's records from
creation to preservation that serves as a means of
protecting the authenticity of the records.
Page 280 of 454

Page 281

Records and Information Management Policy v6.0 10 
Arrangements for transfer of records to North Lanarkshire Archives are governed by the
Records Retention Schedule and can take place on a regular basis or as one-off transfers. At
the disposal date, the archivist should be contacted regarding records identified in the
Records Retention Schedule as for permanent preservation, as being of historical value or to
be offered to the archivist.
In some cases, only a sample of the records will be selected for permanent preservation, and
the archivist will work with the service to select the most appropriate sampling method.
North Lanarkshire Archives has achieved Accredited Archive Status with the UK’s Archive
Service Accreditation Standard and has developed a suite of procedures and guidance
documents concerning all aspects of collections and stakeholder management, in line with
this standard.
Currently only physical records are being transferred to North Lanarkshire Archives however,
in future, appropriate measures will be put in place to preserve digital records identified for
permanent preservation as outlined in the Digital Preservation Framework. 
13. Destructions
Electronic records that are due for destruction should be deleted from Council systems.
Records that are held on NLC servers are backed up for 5 weeks whereas records that are
held on M365 will be backed up for a further 6 months before they become irretrievable.
Physical records that contain Council information should be securely destroyed by the
Council’s preferred third-party provider or shredded so that they cannot be reproduced. 
14. Responsibilities
1. The SIRO is responsible for ensuring that all Council records are managed according to
this policy.
2. The Corporate Records Manager is responsible for maintaining the Council’s Records
Management Plan, providing procedures, advice and guidance on good records
management practice, and ensuring that all service areas are supported by a Records
Retention Schedule and file plans.
3. The archives are the designated place of deposit for Council records of continuing
evidential and historical value, and the archivist is responsible for identifying, preserving,
promoting and making accessible these records and other historical records that may be
acquired by the Council.
4. All managers have day to day responsibility for records management and should ensure
that systems are in place to enable compliance and that staff are familiar with and adhere
to this policy and any related procedures, standards and guidance.
5. All members of staff must complete an introductory online training course in records
management and are accountable to their supervisors for documenting their actions and
decisions and for maintaining records and information systems in accordance with this
policy and any related procedures, standards and guidance.
Page 281 of 454

Page 282

Records and Information Management Policy v6.0 11 
15. Product set
The table below lists documents in the Records and Information Management Policy product
set and other related products. This may include links to other file types, websites and IT
systems.
▪ Those listed under policies, standards, procedures and guidance are the responsibility of
the Records and Archives team.
▪ Those listed under related products are the responsibility of other teams, services or
agencies. 
Product
type
Product
Policies and
plans
▪ Records Management Plan
Standards ▪ Records Retention Schedule
Guidance ▪ Naming Convention Guidance
▪ Archives Guidance
▪ Digital Preservation Framework
▪ Records and Information Management Guidance
▪ Vital Records Guidance
▪ Physical Records Management
Guidancehttps://nlcgov.sharepoint.com/sites/InsideNL/Shared
Documents/Forms/AllItems.aspx?id=/sites/InsideNL/Shared
Documents/Information governance/Records and information
management/Records Guidelines/Vital Records&viewid=d26b8c9d-23ee-
4fd7-9bb8-0d8ffb1815fe
Related
products
▪ Data Protection Policy
▪ Digital and IT Strategy
▪ Information Asset Register
▪ Information and Cyber Security Policy
▪ Payment Card Data Security Policy
Legislation,
regulations,
and
government
guidance
▪ Archive Service Accreditation Standard
▪ BS 15489-1:2016 Information and Documentation - Records Management
▪ BS 4971:2017 Conservation and Care of Archive and Library Collections
▪ Copyright, Designs and Patents Act 1988
▪ Data Protection Act 2018
▪ Freedom of Information (Scotland) Act 2002
▪ Model Records Management Plan - National Records of Scotland
▪ M365 Guidance
▪ Public Records (Scotland) Act 2011
▪ Re-use of Public Sector Information Regulations 2015
Page 282 of 454

Page 283

Records and Information Management Policy v6.0 12 
Product
type
Product 
▪ Section 61 Code of Practice on Records Management under the Freedom
of Information (Scotland) Act 2002
▪ Scottish Council on Archives Record Retention Schedules (SCARRS) -
Scottish Council on Archives
▪ Supplementary Guidance on Proper Arrangements for Archiving Public
Records
▪ UK General Data Protection Regulation
Appendix 1: Glossary of terms 
Term Description
Access The right, opportunity or means of finding, using or
approaching documents and/or information in any format.
Access may also be affected by the legal requirements and the
physical condition of the materials, or the need to conserve
them.
Authenticity The trustworthiness of a record, i.e. the quality of a record that
it is what it purports to be and that is free from tampering or
corruption.
The Council North Lanarkshire Council and North Lanarkshire Licensing
Board.
Disposal Action taken at the end of the retention period. This can be a
decision to retain longer, transfer to the archive or secure
destruction.
File plan A file plan is a form of classification that arranges records by
function. The M365 file plan arranges MS Teams and Sharepoint
sites within functional hubs that mirror functions and activities
as set out in the Records Retention Schedule.
Information Data that has been given value through analysis, interpretation,
or compilation in a meaningful form.
Lifecycle The life span of a record from its creation or receipt to its final
disposal.
Non-current records Records no longer required for the work of the Council but
retained for evidential purposes.
Page 283 of 454

Page 284

Records and Information Management Policy v6.0 13 
Term Description
North Lanarkshire
Archives
Contains records of any age and any format which are identified
by the archivist as having long-term historical, evidential, or
legal value. Exists to maintain a traceable and uninterrupted line
of care, control and possession of the Council’s records from
creation to preservation that serves as a means of protecting
the authenticity of the record.
Records Information recorded, in any format or media, created,
received, and maintained by the Council in the transaction of
business, or the conduct of affairs and kept as evidence of such
activity.
Records Retention
Schedule
A comprehensive list of records series, indicating for each the
length of time it is to be maintained after reaching a trigger
date, and its method of disposition.
Semi-current records Records that are still referred to on occasion for business
purposes on an irregular basis.
SIRO Senior Information Risk Owner - role held by the Chief Officer of
Legal and Democratic with senior management responsibility
for records management and information risk within the
Council.
Structured records Electronic information created or obtained by end users where
the information is stored in tables in a relational database
system such as line of business systems.
Unstructured records Electronic information such as emails, word processing
documents, spreadsheets, presentations and graphics –
documents mostly created by individual users from desktop
applications that are not relational databases. Unstructured
records would also include Adobe PDF files and electronic
captures of facsimiles as well as other image files. 
Page 284 of 454

Page 285

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  REB Date 19/03/26 
Review of the Council’s Democratic, Committee, and Decision
Making Governance Procedures – Phase 1 Update and
Programme Framework 
From  Rachel Blair, Chief Officer (Legal and Democratic)  
E-mail BlaiRr@northlan.gov.uk Telephone 
Executive Summary 
This report provides Policy and Strategy Committee with a comprehensive update on
delivery of Phase 1 (Foundations – Governance Systems and Access) of the Review of the
Council’s Democratic, Committee and Decision-Making Governance Procedures. 
The review was approved on 25 September 2025 and is structured as a four-phase
programme running to December 2026. It is designed to consolidate recent governance
modernisation, strengthen digital capability, enhance transparency and accountability, and
establish a resilient, inclusive and future-focused democratic framework. 
Phase 1 has delivered substantial foundational progress, including: 
(1) Establishment of a documented governance baseline and evidence of incremental
improvements since 2018; 
(2) Procurement and phased implementation of an integrated electronic voting system; 
(3) Introduction of a mobile hybrid/webcasting system to enhance accessibility and
community-based democratic engagement; and 
(4) Commencement of the Committee Management System (CMIS) successor options
appraisal. 
The programme remains on schedule. A further report will be presented setting out the
CMIS appraisal and confirming completion of Phase 1. 
Recommendations
It is recommended that Policy and Strategy Committee: 
(1) Acknowledge the progress made in delivering Phase 1 of the governance review;
(2) Acknowledge the establishment of a documented governance baseline; 
(3) Acknowledge the implementation of electronic voting and enhanced
hybrid/webcasting arrangements;
Item 9
Page 285 of 454

Page 286

1. Background 
1.1 This report provides Policy and Strategy Committee with a comprehensive update on
delivery of Phase 1 (Foundations – Governance Systems and Access) of the Review
of the Council’s Democratic, Committee and Decision-Making Governance
Procedures. The review was approved on 25 September 2025 and is structured as a
four-phase programme running to December 2026. It is designed to consolidate recent
governance modernisation, strengthen digital capability, enhance transparency and
accountability, and establish a resilient, inclusive and future-focused democratic
framework. 
1.2 Phase 1 has delivered substantial foundational progress, including: 
• Establishment of a documented governance baseline and evidence of incremental
improvements since 2018; 
• Procurement and phased implementation of an integrated electronic voting
system; 
• Introduction of a mobile hybrid/webcasting system to enhance accessibility and
community-based democratic engagement; and
• Commencement of the Committee Management System (CMS) successor options
appraisal. 
1.3  The programme remains on schedule. A further report will be presented setting out the
CMIS appraisal and confirming completion of Phase 1. 
2. Report 
2.1  In recent years the Council has modernised its governance arrangements in response
to evolving working practices, digital advancements and increasing public expectations
for transparency, accountability and accessibility. This review consolidates those
improvements and establishes a forward-looking framework that is: 
• Legally robust and procedurally fair;
• Digitally capable and resilient;
• Accessible to members, officers and the public;
• Aligned with recognised best practice across local government; and
• Proportionate and strategically aligned with The Plan for North Lanarkshire. 
2.2  The overarching aim is to ensure that the Council’s democratic and decision-making
arrangements remain fit for purpose, support high-quality democratic processes, and 
(4) Acknowledge that a further report will be presented to regarding the Committee
Management System options appraisal; and
(5) Acknowledge the proposed scope and delivery approach for Phases two to four of
the programme. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Page 286 of 454

Page 287

position the Council as a leader in modern, citizen-centred governance. The review
aligns with: 
• Best Value expectations under the Local Government in Scotland Act 2003;
• CIPFA/SOLACE Delivering Good Governance principles;
• The National Performance Framework; and
• All Council priorities and ambition statements. 
2.3  The review seeks to deliver: 
• Clear and complementary roles and responsibilities between Members and
officers;
• Fair, consistent and transparent decision-making procedures;
• Accessible, plain-language governance documentation;
• Modernised use of technology to support openness and efficiency;
• Proportionate governance structures aligned with long-term organisational
priorities. 
2.4 Phase 1 activity has been structured to directly support these objectives with the review
structured across four phases:  
Phase Focus Area Completion Target
Phase 1 Foundations – Governance systems baseline
and access improvements
April 2026
Phase 2 Engagement and Accessibility – documentation
clarity and public usability
June 2026
Phase 3 Decision-Making Principles – standards,
transparency and competency guidance
October 2026
Phase 4 Full Modernisation – Standing Orders and
Scheme of Administration/Delegation
December 2026 
2.5 This phased approach ensures structured progression from foundational systems to
procedural reform and consolidation. 
2.6 The review encompasses: 
2.6.1 Governance Documentation and Structures
• Modernisation of Standing Orders;
• Review of Scheme of Administration and Delegation; and
• Consolidation of governance documentation into a coherent framework. 
2.6.2 Committee Minutes and Reporting
• Enhancement of clarity and accessibility;
• Development of plain-language approaches; and
• Consideration of summary formats. 
2.6.3 Scrutiny and Public Participation
• Assessment of the Committee Questions Log; and
• Full review of the Petitions Process, including thresholds, guidance,
support and feedback mechanisms. 
2.6.4 Decision-Making Principles
• Review of motions and amendments processes; and
Page 287 of 454

Page 288

• Consistency, fairness and proportionality in procedural application. 
2.6.5 Guidance and Competency Frameworks
• Updated guidance for Members and officers on competency of motions
and amendments; and
• Clear approaches to non-competent matters. 
2.6.6 Technology and Committee Management
• Review and modernisation of the Committee Management System;
• Digital accessibility improvements; and
• Integration with voting and webcasting systems. 
Phase 1 Progress Update 
2.7 Phase 1 has established a documented governance baseline, including a chronology
of governance updates and improvements since 2018 (Appendix A) and a summary of
how governance practices have evolved, particularly in digital accessibility and
publication standards (Appendix B). These documents provide a structured evidence
base demonstrating incremental improvement and supporting external scrutiny. 
2.8 An integrated electronic voting system has been procured and piloted. This system
enables in-chamber and remote voting, automated recording and display of voting
outcomes and creation of auditable digital records. Initial implementation indicates
improved clarity, efficiency and transparency. Training and structured support are being
provided to Members to ensure confident adoption prior to full roll-out. 
2.9 A mobile hybrid/webcasting system has been introduced to enhance technical
resilience, improve accessibility for remote participation, enable meetings to be held in
community venues with full democratic functionality and strengthen public transparency
through improved webcast quality. Appropriate safeguards remain in place for exempt
business and data protection compliance. 
2.10 An options appraisal for a CMS successor is underway, assessing usability for
members and officers, public accessibility, integration capability, records management
functionality and long-term sustainability and value for money. A future report will be
presented confirming the outcome of the options appraisal. 
2.11 Phase 2 will focus on engagement and documentation accessibility, including minutes
reform and petitions process review. Phase 3 will establish clearer decision-making
standards and updated competency guidance. Phase 4 will deliver a comprehensive
modernisation of Standing Orders and the Scheme of Administration and Delegation,
consolidating reforms into a single coherent framework. 
2.12 Phase 2 (April–June 2026) will focus on strengthening public-facing governance and
improving accessibility and engagement. Key areas will include: 
• Review of committee minutes to enhance clarity and readability, including
consideration of plain-language summaries;
• Assessment of the Committee Questions Log to ensure it strengthens scrutiny and
accountability; 
• Review of the Petitions Process, including thresholds, clarity of guidance and
feedback mechanisms; and
Page 288 of 454

Page 289

• Consideration of improvements to public-facing publication standards and digital
navigation. 
2.13 Member engagement sessions and cross-group discussions will be embedded
throughout these phases. Member engagement remains central to the governance
review. Member engagement remains central to the governance review. The approach
that will be applied during Phase 2 includes facilitated workshops, briefings to gather
structured feedback, circulation of draft proposals for comment before formal reporting
and transparent capture and documentation of member feedback. 
Conclusion 
2.14  Phase 1 of the governance review has delivered substantial foundational improvements
and has established a clear evidence base of governance development since 2018.
The procurement and pilot implementation of electronic voting and enhanced
hybrid/webcasting capability represent significant modernisation milestones. 
2.15  The review remains on schedule, with Phase 1 completion aligned to April 2026 and a
further update to follow. The transition to Phase 2 will shift focus toward public
accessibility, engagement and usability, ensuring that governance arrangements
remain transparent, proportionate and aligned with best practice across Scottish local
government. 
3. Measures of success 
3.1      Phase 1 will be considered successful where: 
• A clear documented governance baseline is established;
• Electronic voting operates securely and reliably across committees;
• Hybrid/webcasting arrangements demonstrate improved resilience and
accessibility;
• The CMIS/MARS options appraisal provides a clear strategic direction; and
• Elected members confirm that governance systems are clearer, more accessible
and more transparent than prior to commencement of the review. 
4. Supporting documentation 
Appendix A – Chronology of Governance Improvements Since 2018
Appendix B – Evolution of Governance Practice and Digital Accessibility 
Rachel Blair
Chief Officer (Legal and Democratic) 
Page 289 of 454

Page 290

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The review supports compliance with statutory governance obligations, including
Best Value duties and administrative law principles. 
Modernisation of Standing Orders and delegation schemes will ensure decisions
remain within statutory competence and reduce exposure to procedural challenge. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Page 290 of 454

Page 291

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The review carries a positive communications impact by demonstrating proactive
governance strengthening. Implementation of electronic voting and improved
webcasting enhances public visibility of decision-making. Future phases will require
structured communication to Members, stakeholders and the public regarding
documentation changes and accessibility improvements. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Key risks include:
• Reputational risk if governance arrangements are perceived as outdated;
• Technological obsolescence risk without system modernisation;
• Procedural inconsistency risk absent consolidated documentation;
• Engagement risk if reforms are not clearly communicated.
These risks are managed through structured programme governance and the Project
Risk Register. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact
Page 291 of 454

Page 292

Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 292 of 454

Page 293

Appendix A
Review of the Council’s Democratic, Committee and Decision-Making Governance
Procedures
Chronology of Incremental Updates and Evidence of Existing Improvements Since
2018 
4 October 2018 – Comprehensive Review of Standing Orders 
Following the local government elections in May 2017, which resulted in over 30 newly elected
members and the most significant political change since reorganisation in 1995, a structured
review of Standing Orders was undertaken. The review was conducted collaboratively by the
Business Managers of the three political groups and was designed to modernise procedures,
improve clarity, and support members in balancing civic duties with professional and personal
commitments. 
Key enhancements included: 
• Motions and Amendments
o Clarification of procedural requirements, including submission deadlines,
timescales, competency and affordability criteria.
o Formal inclusion within Standing Orders of the process for publication of
Notices of Motion and Amendments.
o Requirement to provide written reasons where a Notice of Motion or
Amendment was deemed not competent.
o Introduction of a formal definition of a “C Paragraph”.
o Provision allowing the mover of an Amendment to sum up, with the mover of
the substantive Motion retaining the right of final summation.
o Discretion for the Chair to permit members to speak more than once during
debate.
o Explicit permission for members to read from prepared written speeches.
o Requirement for members raising a Point of Order to provide a clear
explanation of the alleged breach of Standing Orders. 
• Questions
o Agreement that questions would be placed on the agenda in the order received,
removing the previous ballot system and strengthening procedural fairness. 
• Notice of Agenda Papers
o Extension of the publication period for committee agendas and reports to six
clear days prior to meetings, enhancing transparency and preparation time. 
• Substitute Membership
o Political groups permitted to appoint up to three named substitute members on
non–quasi-judicial committees, providing flexibility and improving attendance
management. 
3 October 2019 – Procedural Streamlining 
Further refinements were agreed to enhance operational efficiency and clarity:
• Streamlining of the process for issuing and approving the Volume of Minutes.
• Formal agreement of the order of business for Ordinary Council meetings.
• Clarification of the process and timescales for publishing Motions and Amendments.
• Introduction of a defined process for resubmitting Motions and Amendments previously
ruled not competent.
Page 293 of 454

Page 294

• Clarification regarding the compositing of Motions and Amendments prior to and during
meetings.
• Update to the procedure for issuing Committee Agenda Packs to provide greater clarity
and consistency. 
6 October 2022 – Timetable Rationalisation 
Council approved a revised timetable of meetings covering the period to May 2027. The
timetable was refined to better align with members’ availability and to improve scheduling
coherence across the civic calendar. 
15 December 2022 – Strengthening Competency and Affordability Requirements 
Standing Order 31 was amended to require that any Motion, Amendment or Composite Motion
must:
• Meet the criteria of competency, relevancy, and affordability; and
• Provide full details of associated financial implications and funding sources.
This change reinforced budgetary discipline and strengthened governance by ensuring
financial transparency and alignment with the Council’s fixed annual budget framework. 
21 December 2023 – Governance and Scrutiny Enhancements 
To maintain alignment with CIPFA’s Audit Committees: Practical Guidance for Local
Authorities (2018) and to support the Council’s Best Value obligations:
• Substitute members were removed from the Audit and Scrutiny Panel to ensure
consistency, appropriate training, and institutional knowledge.
• All Planning, quasi-judicial and regulatory committees and sub-committees were
required to meet in person.
• The previous requirement to nominate three substitutes per committee was removed,
providing increased flexibility for political groups while maintaining governance
standards. 
19 December 2024 – Procedural Modernisation and Clarity 
A further package of amendments was approved to enhance interpretability and transparency:
• Revision of several Standing Orders to improve clarity and usability.
• Authority granted to the Chair to adjourn meetings for up to 30 minutes.
• Streamlining of the amendment submission process.
• Introduction of a deadline requiring Amendments to be submitted no later than 24 hours
prior to committee meetings.
• Extension of substitute member arrangements to all Committees and Working Groups,
except the Audit and Scrutiny Panel and the Licensing Board.
• Agreement that Planning Committee meetings be held in hybrid format.
Collectively, these measures strengthened procedural transparency, improved member
participation, and enhanced operational flexibility. 
Page 294 of 454

Page 295

Appendix B
Review of the Council’s Democratic, Committee and Decision-Making Governance
Procedures
Evolution of Council Practices in Terms of Digital Accessibility and Publication
Standards 
4 October 2018 – Audio-Visual Recording 
Council agreed that audio-visual recording of meetings would be conducted in accordance with
the Council’s Media Policy, formalising arrangements for public access and transparency. 
3 October 2019 – Digital Accessibility Improvements 
To enhance accessibility and reduce reliance on paper-based systems:
• The Volume of Minutes was issued electronically only.
• The process for approving committee minutes was simplified.
• Introduction of electronic meeting requests and electronic links to agenda packs,
enabling immediate access upon publication.
• Hard copy agenda packs remained available upon request, ensuring inclusivity. 
13 August 2020 – Remote Meeting Protocol 
In response to operational challenges and to strengthen resilience: 
• Remote meetings were introduced.
• A formal Protocol for Remote Council and Committee Meetings was implemented to
facilitate structured hybrid operation.
• Comprehensive member training was delivered on the Webex platform.
• The protocol set out detailed procedures covering:
o Issuing of agenda packs;
o Submission of Amendments;
o Declaration of interests;
o Use of chat functions;
o Points of order; and
o Electronic voting processes. 
These measures ensured governance integrity while maintaining decision-making continuity. 
7 October 2021 – Introduction of Hybrid Meetings 
Council formally introduced the capacity to host hybrid meetings, enhancing flexibility and
broadening participation opportunities for elected members. 
6 October 2022 – Commitment to Hybrid Working 
Council approved a Notice of Motion recognising that hybrid working:
• Enhances participation, capacity and empowerment;
• Reduces barriers faced by individuals from marginalised backgrounds;
• Reflects contemporary workplace practices; and
• Promotes inclusion and equality.
Standing Orders and the Remote Meetings Protocol were amended to embed a commitment
to hybrid arrangements for appropriate meetings. 
1 July 2023 – Committee Management Information System
Page 295 of 454

Page 296

Implementation of a new Committee Management Information System delivered enhanced
functionality, including: 
• Publication of member attendance records;
• Logging of declarations of interest;
• Publication of committee membership and appointments to outside bodies;
• Support for the organisation of Councillor surgeries. 
These improvements materially strengthened transparency and public access to governance
information. 
22 October 2023 – Access to Exempt Business 
Council agreed that exempt items of business be recorded and made available to elected
members, individually or by political group, upon request, thereby strengthening oversight and
informed participation. 
21 December 2023 – Minute Recording and Accessibility Enhancements 
• Committee minutes were amended to formally record questions asked where follow-up
actions were committed.
• Agenda packs ceased to be routinely posted to members’ home addresses, subject to
Equality Act 2010 considerations assessed on a case-by-case basis. 
These changes reinforced accessibility while supporting environmental and efficiency
objectives. 
19 December 2024 – Electronic Voting and Question Logging 
• Introduction of electronic voting for members present in the chamber to improve
meeting efficiency and transparency.
• Refinement of the process for recording member questions.
• Distribution of responses to all committee members and circulation of a consolidated
question-and-response log at the end of each meeting cycle. 
18 December 2025 – Award of Electronic Voting and Hybrid Meeting System Contract 
Council received confirmation that the contract for an integrated electronic voting and mobile
hybrid meeting system had been awarded. 
The project forms a central component of the Council’s democratic modernisation programme
and aligns with: 
• The Review of Democratic, Committee and Decision-Making Governance Procedures;
and
• The Digital North Lanarkshire Programme of Work. 
System capabilities include: 
• Secure voting via:
o In-chamber microphone consoles; and
o Council-issued laptops or mobile devices through a Microsoft Teams plug-in.
• Automatic recording, tallying and display of voting outcomes.
• Mobile capability allowing meetings to be held in community venues with full webcast
and voting functionality.
Page 296 of 454

Page 297

Key benefits: 
• Webcasting capability across Committee Rooms and designated community locations;
• Facilitation of hybrid Community Board meetings;
• Enhanced community participation and empowerment;
• Strengthened resilience and business continuity through portable systems; and
• Integrated microphone, video and hybrid control systems reducing technical risk. 
Page 297 of 454

Page 298

Page 298 of 454

Page 299

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref     LR/HL Date 19/03/26 
UK Town of Culture 
From  Lyall Rennie, Chief Officer (Community Operations)  
E-mail liddleh@northlan.gov.uk Telephone 07973 726496 
1. Background 
1.1 UK Town of Culture is a new Department for Culture, Media and Sport (DCMS)
competition. For the first time, DCMS is inviting towns across the UK to enter the
Executive Summary 
In early January 2026, the UK Government launched the search for the UK’s first Town of
Culture.  This programme builds on the UK City of Culture introduced in 2009 and sought
to celebrate the contribution of people and places across the UK to our cultural life.  The
Town of Culture programme notes that everyone deserves the chance to share their pride
in the place they call home and to have access to quality art, music, dance and drama
wherever they live. 
Following interest from community representatives in Cumbernauld to submit an
application to become UK City of Culture, this report outlines the support that will be offered
by North Lanarkshire Council and gives an outline of the programme and key next steps. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Approves the proposal to support a community led application from the
Cumbernauld community for the new UK Town of Culture award. 
(2) Otherwise, notes the contents of this report.  
The Plan for North Lanarkshire
Priority  Enhance participation, capacity, and empowerment across our
communities
Ambition statement (15) Encourage the health and wellbeing of people through a
range of social, cultural, and leisure activities
Programme of Work All Programmes of Work
Item 10
Page 299 of 454

Page 300

competition to showcase original storytelling, and empowering, accessible culture. The
competition is targeted at all towns, whether small, medium or large. 
1.2 The winning town will be awarded £3 million to deliver a cultural programme in 2028 of
around six months. Additionally, the two finalists from their category will receive
£250,000 each to deliver elements of their bid.  It is a UK-wide programme, developed
in collaboration with the devolved governments in Northern Ireland, Scotland and
Wales. 
1.3 The UK Town of Culture competition aims to celebrate the significant contributions of
towns to our national story. The competition focuses on building a more socially
cohesive country where communities feel proud of their place and empowered to
celebrate it. The UK Town of Culture is an opportunity for places and communities to
use culture and creativity to tell their story and why they are proud of their community. 
In addition to the £3 million main prize and £250,000 finalist prizes, the Government
anticipate that winning will lead to significant, demonstrable outcomes, including a
boost in civic pride, greater participation in cultural activities, and the formation of
enduring community partnerships 
2. Report 
2.1 With the forthcoming celebrations of Cumbernauld’s 70th anniversary, the council were
made aware of significant interest from community groups in the area to submit a bid
for this competition.  With a population of approximately 50,500, Cumbernauld would
bid for consideration under the medium town category.  While there is a requirement
for all bids to be made in conjunction with the local authority, this project offers the
opportunity for the council to support the community to develop their own programme,
building capacity and allowing them to steer and design future plans in line with
community need. 
2.2 The council’s Heritage Outreach Officer will be the lead on behalf of North Lanarkshire
Council, working with Cumbernauld Theatre Trust, who will act as the Accountable
Body.  The responsibilities of the Accountable Body include: 
• Ensuring the safe and successful delivery of a UK Town of Culture programme;
• Managing the financial and legal requirements associated with the delivery of a UK
Town of Culture programme;
• Taking responsibility for the organisation of a UK Town of Culture programme,
including leading on the necessary coordination between relevant partners;
• Taking responsibility for any grant funding associated with a UK Town of Culture
programme, for which the Accountable Body is the recipient organisation; and
• Monitoring delivery of a UK Town of Culture programme and undertaking relevant
reporting as may be required by DCMS. 
2.3 The Delivery Body is still to be determined but will involve input from North Lanarkshire
Council.  Initial discussions have involved representation from Coatbridge and
Cumbernauld Community Connect (4C Connect) Limited -  a consortium of
Cumbernauld FM and Cumbernauld College, Cumbernauld Village Community Council
and Living Landscapes.  All are likely to be involved in delivery, with the Delivery Body
responsible for the planning, procuring, commissioning and delivery of a planned UK
Town of Culture programme.  With the support of Katrina Murray MP, the initial phase
of the bid is distributing a short survey to local residents, businesses and stakeholders
to determine the local priorities for the forthcoming application.  Bidders are encouraged
Page 300 of 454

Page 301

to consider how their application will complement other UK government place-based
initiatives, notably the Pride in Place Strategy which sets out a plan to create safer,
healthier neighbourhoods where communities can thrive. 
2.4 Next Steps 
2.4.1 Timescales for the application and delivery process are tight: 
Expression of Interests (EOI) to be submitted by 31 March 2026. 
Stage 2 – shortlisted towns will be awarded a grant of £60,000 each to support them
with developing and strengthening their full application. DCMS intend to publish
detailed full application guidance in Spring 2026.  Applicants will have up to five months
to complete the full application. 
Stage 3 – the decision-making panel will visit the shortlisted places, who will be invited 
to present to the panel and engage in detailed discussions about their plans.  The panel
will submit their recommendation for the finalists and overall winner of UK Town of
Culture 2028 to the Secretary of State for DCMS, who will make the final decision. 
DCMS aims to announce the UK Town of Culture 2028 winners in early 2027 
3. Measures of success 
3.1  A successful application from a community led bid which supports the forthcoming
anniversary of Cumbernauld, while fostering a sense of local pride and strengthening
of the community. 
4. Supporting documentation 
No supporting documentation. 
Lyall Rennie
Chief Officer (Community Operations) 
Page 301 of 454

Page 302

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Page 302 of 454

Page 303

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Corporate Communications are involved in discussions around the Cumbernauld
anniversary and will contribute to further project develops as appropriate. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 303 of 454

Page 304

Page 304 of 454

Page 305

North Lanarkshire Council
Report
Policy & Strategy Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref     LR/HL Date 19/03/26 
Corporate Booking System – Update of Implementation 
From  Lyall Rennie, Chief Officer (Community Operations)  
E-mail liddleh@northlan.gov.uk Telephone 07973 726496 
1. Background 
1.1 The award of a contract for a corporate booking system arose from a number of
operational requirements which were considered could be addressed through the
development and implementation of a single solution which offered simplified
management and governance, improved security and compliance, reduced costs and
a better user experience. 
Executive Summary 
In February 2024, the council approved the award of a contract for a Corporate Booking
System to Gladstone MRM, with the 60 month initial award period commencing in March
2024.  The procurement was split into 3 sections: 
• Leisure Management and Membership System 
• Community Facilities and School Lets 
• Community Hub bookings 
This report provides an update on implementation and an overview of next steps. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Notes progress on implementation of the new Corporate Booking System and
actions taken to work with stakeholders to ensure a smooth transition to improved
customer management arrangements.
(2) Otherwise, notes the contents of this report. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work One Service
Item 11
Page 305 of 454

Page 306

1.2 The initial driver was the need to for a replacement of the existing leisure management
system with a new system providing end to end membership and booking for all NLC
leisure venues.  With the current Community Facility system coming to the end of its
life, there was an opportunity to address a wider concern which had arisen following
insourcing of services where booking procedures for customers was considered
confusing and required alignment.  A further opportunity to align booking processes for
customers and staff using our community hubs was added to the scope of the new
contract. 
2. Report 
2.1 With the broad scope of this project, implementation led by Active & Creative
Communities in collaboration with Community Facilities and the Community Hub team
has allowed for increased innovation and creativity, responding to real-time issues and
challenges to ensure the developing solution to continues to meet customer and
community needs.  The programme is monitored under the One Service Programme
of Work. 
2.2 The contract was awarded to Gladstone MRM who were the previous contract holder
and had worked with North Lanarkshire Council (and previously North Lanarkshire
Leisure) for a number of years.  This allowed for an improved transition process from
the previous leisure management system to the upgraded Gladstone 360 platform.  The
benefits of the new system include: 
• Unified, fast and intuitive front of house workspace – brings booking,
memberships, payments, access control and customer details into one
connected interface.
• Mobile ready and tablet-enabled – the system is browser based and staff can
use it to support customers anywhere in the facility and not just reception.
• Strong customer service integration.
• Fully customisable and configurable – the new leisure management system is
tailored to meet North Lanarkshire Council’s needs.
• Improved customer experience – staff get real time insights into bookings,
attendance and access control events – helping them to resolve issues quickly
and deliver a better interaction. 
2.3 Overall implementation of the programme has included the following steps: 
• IT network configuration and whitelisting.
• Business process review and revision/implementation
• Power BI reporting design and implementation.
• Configure and implement new online booking and joining software/ 
2.4 Implementation of the new leisure management system commenced in September
2024, with the system now live in four of our venues in December 2025 and the rest
coming online in mid March.  The key focus within Active NL has been the deployment
of software and installation of point of sale systems to ensure compliance with all
necessary banking regulations.  Staff training has been key to ensure a smooth
transition to the new system. 
2.5 To encourage the continued use and community benefit derived from our Hubs and
community facility spaces, much work has been done to consider business processes
and how best to improve the customer experience.  We continue to use our experience
of working with the community to identify users and ensure the system is configured to
Page 306 of 454

Page 307

consider all booking options, available spaces, staff roles and automated
communications.  We continue to work on the development of the app to allow easy
online access and ensure all staff are trained and able to assist customers at all stages
of their journey. 
2.6 Stakeholder Engagement 
2.6.1 The council was very clear that the new booking arrangements represent a significant
change in approach for some operational areas.  While less of an adjustment in the
leisure world, we have ensured ongoing communication and training for staff to ensure
familiarity with the new system.  The trade unions had originally expressed some
concerns around the impact that online bookings will have on Facilities staff working in
the hubs, particularly relating to potential impact of a significant increase in volume of
bookings, the change to processes and the impact on school-based tasks. There have
now been several positive discussions with local trade unions on this to outline what is
involved and these will continue to take place. We have also worked with facilities staff
on the development of the personas to identify areas in the new processes that may
need to be further explored to ensure successful implementation. 
2.6.2 Education staff including Head Teachers and school clerical staff have also inputted to
the development of the personas to identify the user experience before and after
system implementation with the benefits being recognised such as streamlined
processes that will reduce the current administrative burden, and a new solution being
welcomed to benefit the overall booking experience and visibility of in hub bookings. 
2.7 Next Steps 
2.7.1 As outlined, the launch of Gladstone 360 is now well underway within Active NL, with
customers benefiting from improved access arrangements and smarter working
processes for staff.    The next stage of the process is a planned pilot project covering
the Buchanan Centre and St. Andrews Hub. This pilot will run for 12 weeks from June
2026 and will allow both customers and staff to understand how they can access online
bookings for spaces within our community hubs and wider community estate. The
results from the pilot will inform the roll-out across the estate. 
3. Measures of success 
3.1  A comprehensive and aligned approach to customer facing communications which
supports access to services in support of participation, wellbeing and community
support.   
4. Supporting documentation 
No supporting documentation.   
Lyall Rennie
Chief Officer (Community Operations) 
Page 307 of 454

Page 308

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
All costs associated with the contract were covered prior to award and continue to
be monitored. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Where appropriate, People Resources have been involved in discussions with
trade unions. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Page 308 of 454

Page 309

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☒ 
If Yes, please provide a brief summary of the impact?
Business and Digital colleagues have been involved in contract implementation
considerations throughout. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☒ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Contract implementation has been linked to staff communication throughout. 
When appropriate external marketing will take place. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All risks managed in line with ACC overall risk management plan. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC).
Page 309 of 454

Page 310

If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 310 of 454

Page 311

North Lanarkshire Council
Report 
Does this report require to be approved? ☒ Yes  ☐ No
Ref JMcK/CMcC/AMcP Date 19/03/26 
From Andrew McPherson, Depute Chief Executive
E-mail mcphersona@northlan.gov.uk Telephone 07939 280467 
Executive Summary 
Ravenscraig is a significant area of land within the North Lanarkshire area. There have
been various iterations of the Ravenscraig masterplan over the years. It is expected that
over time, additional homes will be built, requiring new facilities to serve the increased
population. 
Following a statutory education consultation, carried out by the Education and Families
Service, new catchment areas were approved in 2021, affecting the catchment areas of
eight existing schools. It is important that any new provision assesses the impact on the
existing schools, which could make them vulnerable to closure. 
To date, around 1,000 new homes have been created within the Ravenscraig area. Pupils
from these houses have been accommodated within the existing estate and there is still
space for more pupils in the existing schools.
Analysis has been carried out to understand the impact on the existing schools, and the
growing population, to understand the impact of opening the new school provision around
2029 – the final year of the current Strategic Capital Investment Plan. 
As the report outlines, building new school provision, at this time, would have a negative
impact on the existing school estate, and would potentially leave the new schools, or some
existing schools, with low levels of occupancy. Rather, it is more prudent to track the need
for additional capacity against the rate and number of new homes delivered – as it is these
indicators which will determine when any new mainstream school provision would be
required. 
What cannot be lost however, is that the key driver for Ravenscraig, is not centered around
mainstream schooling, but around the wider placemaking ambition. So, although the
current level of housebuilding does not currently justify the delivery of new mainstream
school provision, there is still a need to continue with the drive to regenerate the area for
the benefit of the local communities and adapt to the changing demands within such a large
regeneration area. 
As part of this placemaking ambition, there exists the opportunity to consider the
establishment of a dedicated ASN facility on the site. Demand for ASN provision within
North Lanarkshire continues to increase, reflecting national and local trends associated
Policy and Strategy Committee
Ravenscraig Community Hub
Item 12
Page 311 of 454

Page 312

with the rising identification of complex and profound needs. Current provision, both within
mainstream settings and existing specialist resources, is under increasing pressure. The
development of a dedicated ASN school within the authority would directly respond to this
demand and support the Council in meeting its statutory duties to provide appropriate
education for all children and young people.
Analysis also shows that the current agreed location for the community hub (as per the
2021 statutory education consultation) does not provide significant flexibility on the offering
we could provide at that location. The site is approximately 2.5 hectares, and it would likely
only accommodate two schools on that site. There is no scope for other facilities (e.g.
cultural offering) at this site. 
Conversely, the Levelling Up Fund (LUF) site (which was proposed for the community hub
as part of the LUF bid) at approximately 7.5 hectares, offers significantly more space to
marry current and future council ambitions - be that mainstream education, bespoke ASN
education, cultural offering (theatre), or social housing. At around three times the size of
the other site, it provides flexibility to bring the right assets forward at the right time. To take
this forward, further ground investigation works will be required to fully assess the costs
associated with any future development of the site. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Acknowledge the outcome of the Options Appraisal exercise for the provision of
mainstream school provision.
(2) Acknowledge that a statutory education consultation would be required to change
both the location, and the catchment area for the new schools (at the appropriate
time).
(3) Agree for officers to track the need for a new school against the rate and number of
new houses built each year using the published Housing Land Audit. 
(4) Agree that further ground investigations are undertaken on the ‘LUF’ site. 
(5) Acknowledge that, following completion of the ground investigations works, the
feasibility assessment for a dedicated ASN facility and on receiving the outcome from
Historic Environment Scotland on the future of the Motherwell Concert Hall, a further
report will be submitted to Committee outlining how future developments could
continue with the place making ambitions for Ravenscraig in line with the Council’s
overall Programme of Work. 
The Plan for North Lanarkshire
Priority All priorities
Ambition statement All ambition statements
Programme of Work Transforming Places 
Page 312 of 454

Page 313

1. Background
1.1 The Plan for North Lanarkshire is the key strategy linked to making North Lanarkshire
the place to live, learn, work, invest and visit. The plan is delivered via a series of
Programmes of Work, one of which is the Transforming Places Programme of Work.
The Town and Community Hub programme reports through the Transforming Places
programme of work 
1.2 In March 2025, Policy and Strategy Committee approved the Strategic Capital
Investment Programme for 2024/25 to 2028/29. Within this approved capital
programme, a commitment of £347m was allocated to the Town and Community Hub
programme, outlining the aspiration to review projects in Abronhill, Glenboig, and
Ravenscraig.
1.3 Ravenscraig is a significant area within the Motherwell area, which has delivered
around 1,000 houses over the last few decades. Public investment within the area has
also been significant within the area, with a regional sports facility, a further education
establishment, and a playpark with public open spaces. 
1.4 Various iterations of a masterplan for the area have been produced over the decades,
with each showing a mix of housing and other infrastructure investment. As with many
areas, plans can change over time, reacting to the perceived needs of the local and
regional area at that time.
1.5 The number of houses planned on the site has fluctuated over time, with the council
monitoring this through the Housing Land Audit, which is produced and agreed
annually. In recent years, the Housing Land Audit (HLA) has shown that an additional
3,448 houses could be delivered under plans. 
1.6 It is noted that some housing sites have also been earmarked for other potential
developments, such as an AI datacentre. As has recently been demonstrated, the
economic and community benefits associated with datacentres is significant, but what
this also highlights is the dynamic nature of strategic development plans within an area
the size of Ravenscraig, and the causal effect of projecting requirements for future
pupils. The data centre proposal would reduce the overall housing projection within
Ravenscraig by around 1,000 units, but this must be set in context against the
significant economic benefit and the housing growth which would be stimulated
elsewhere as a result.
1.7 As a rule of thumb, pupils generated from new housing amount to three pupils for every
ten houses built. Therefore, for around 1,000 houses, an approximate 300 pupils would
be added to the pupil populations for local schools. These pupils are distributed
amongst the various schools, based on catchment areas which predate the current
masterplans. 
1.8 All pupils from the completed 1,000 homes to date, have been accommodated within
the existing school estate and at present there is still sufficient capacity to
accommodate additional pupils. 
2. Report 
2.1 As outlined in the background section above, it is acknowledged that Ravenscraig is a
significant development, and has increased and will continue to increase the local
population. The development of land, and timescales, has changed over time which Page 313 of 454

Page 314

requires recalibration of other plans, such as when new schools are required, in
response to development changes.
2.2 The investment identified within the 2024 Strategic Capital Investment Plan, for the
Ravenscraig Community Hub, provided an opportunity to evaluate what impact building
school provision, to support the current, and future populations, may have on both the
existing and new school populations. At that time, the investment concentrated on the
potential immediate need for new (mainstream) schools to meet demand, with an
understanding that this need was subject to analysis. 
2.3 Whilst our Community Hub offering looks to deliver for the whole community, schools
are the core and main service delivered from these hubs. The focus of this report is on
the schools which would be within the hub. That said, whilst the immediate focus was
on the need for new schools to meet demand, it was recognised that emerging plans
to meet the ambitions of the council, along with the analysis of the school need,
determined that the original site for the schools no longer marry with the ambitions of
the council. 
2.4 As reported to previous committees, analysis was required to understand how creating
additional schools would affect the current schools and school populations. As such,
an option appraisal exercise was carried out in 2025 to analyse the impact on both the
existing and new school provision through analysing different scenarios linked to the
creation of a new Community Hub by 2029. 
Determining the need for new schools
2.5 Creating completely new schools is a rare occurrence and generally only happens
when significant numbers of houses are created within a small geographical area –
which without the new schools, would place significant and unmanageable pressures
on the existing schools.
2.6 Generally, existing schools would be replaced by new schools, which could
accommodate a larger number of pupils. Alternatively, an extension to the existing
schools would facilitate the growth required for accommodating the increase in pupil
numbers. 
2.7 It has been evidenced that the number of births has been declining and is expected to
continue to reduce over the decades to come. This coincides with an increase in the
number of older adults within our communities – creating a different set of challenges.
The point being that the rate of housebuilding is critical to understand if the new pupils
generated from new housing can be offset by the reduction in births over the decades. 
2.8 It is observed there is a dramatic difference between how the council would need to
react to 3,000 houses being built over a decade, compared to 3,000 houses being built
over five decades. This is because there is a marked difference between 100 pupils
presenting at once, to 10 new pupils presenting each year. Using primary schools as
an example, a pupil will attend for seven years, so in year eight, a new pupil can take
the space vacated by the pupil who started seven years ago. Therefore, it can be
illustrated that 10 pupils presenting from the houses built in year eight, could take the
space of the pupils who presented in year one.
2.9 It should be noted that this is an illustrative example, rather than modelling of projected
pupil numbers, which is much more nuanced. The example does, however, illustrate
the point at a macro level – where housing is spaced out, the demand on the schools
is much less than when high levels of housing are delivered within a short time. 
Assessing the impact on the current school estate. 
2.10 There are eight schools which currently serve the area (which would become the new Page 314 of 454

Page 315

Ravenscraig catchment(s)), and where their overall catchment area would be reduced,
and pupils realigned to the new Ravenscraig schools based on the currently agreed
catchment areas (as approved through the Statutory Education Outcome Report
presented to Education and Families Committee in May 2021). 
2.11 The analysis for this exercise concentrates on the primary school estate. This is
because the impact on these schools will be more acute than on the secondary school
estate. Due to the way early years is operated, through private, public and third sector
provision, there is more ‘flex’ with this provision where new spaces do not need to come
from the local authority. 
2.12 Within the primary estate, each house has the choice of two schools, one for non-
denominational provision, and one for denominational provision. As such the analysis
on the impact was run from two perspectives: impact on the non-denominational
schools, and impact on the denominational schools which are impacted by the creation
of new school provision in the Motherwell area surrounding Ravenscraig. 
2.13 There are eight schools which would be impacted by the creation of new school
provision within this area, these are outlined in the table below. 
Non-Denominational Primary Schools Denominational Primary Schools
Keir Hardie Primary School Our Lady of Good Aid (Cathedral) PS
Muir Street Primary School Out Lady and St Francis Primary School
Glencairn Primary School St Thomas’ Primary School
Knowetop Primary School 
Berryhill Primary School 
Table 2.13 – Existing primary school provision serving the area
2.14 The creation of completely new schools take land and pupils from other schools,
through the creation of new school catchment areas. This can clearly have an impact
on the occupancy levels and as a result, viability of the existing schools which now
cover smaller geographical areas. 
2.15 Occupancy levels in schools (which is the number of spaces used, when compared
with the number of spaces available) are assessed annually, reported as part of a series
of ‘core fact’ returns to Scottish Government, and are used to assess the ‘efficiency’ of
the school estate. 
2.16 Whilst there is no ‘target’ for school occupancy, there are thresholds which would be
determined to be optimal, when looking at how efficient a school is. A school which has
occupancy between 70% to 90% would be considered as operating effectively within
our school estate. 
2.17 Above 90% and in any given year, the school could face difficulties in configuring class
sets. This is because, as year groups change, the number of pupils who can be
accommodated change. For example, only 25 pupils can be in a P1 or a composite
class, a P2 or P3 class can accommodate 30 pupils, and a P4 to P7 class can
accommodate 33 pupils. School capacities (the number of spaces available) is
generally calculated using these figures (assuming the size of the classroom is
sufficient). So in a school with seven classes it is determined that it can hold 217 pupils
(P1 (25), P2 and P3 (30), P4 to P7 (33) – 25+30+30+33+33+33+33 – 217)
2.18 If however, you have 34 P4s, for that year you are going to have to split them into two
classes – if you create a P3/4 or a P4/5 you can only have 25 in that class (as it’s a Page 315 of 454

Page 316

composite). For every composite you create outwith P1, you reduce the number of
spaces available by up to 8 (33-25). Hence the desire to set the threshold to 90% as
it provides ‘year on year flexibility’ for class configurations. 
2.19 At the opposite end of the scale, once a school falls below 70% it becomes less efficient.
Once a school is operating below 50%, there are more spaces empty than being used
– and this is clearly an inefficient use of space. When these scenarios appear, school
closures are a possibility, as merging smaller inefficient schools with larger schools
makes the estate more efficient. 
2.20 As such, when a new school is introduced, which will take pupils either immediately or
over time, from their existing school, it is reasonable to consider the impact of such
action on the existing school estate, to avoid making any of these schools, and the
overall estate, from becoming inefficient. 
Ravenscraig Community Hub – Options Appraisal Analysis 
2.21 The data from the 2024 Housing Land Audit (HLA) was used to assess the impact of
the proposed housing, and associated phasing within the Ravenscraig area. The 2025
HLA has recently been created and there is no significant difference to the 2024 audit.
As such the findings from the 2024 HLA analysis remain relevant.
2.22 The analysis looked at the impact of having a new Ravenscraig Community Hub open
and operational by 2029, as this is the last year of the current Strategic Capital
Investment Plan. The analysis looked at the impact on the existing schools and the
newly created school provision using various scenarios: 
2.22.1 Scenario 1 – do not build a new community hub by 2029, using the existing
schools to accommodate any new pupils. 
2.22.2 Scenario 2 – build new schools using the new catchment boundaries, as
approved via the statutory education consultation. This scenario shows the
impact on all existing schools, and the newly created schools. This scenario uses
the catchment areas, as consulted on and approved in May 2021. 
2.22.3 Scenario 3 – build new schools using alternative new catchments. This purpose
of this scenario was to analyse if pupils could be distributed more evenly, using
a different geographic (catchment) area than that consulted on in May 2021. The
results are based on these alternative catchment areas, created to try and
disperse pupils more evenly to manage the occupancy levels of the schools
within the area.
Scenario 1 – Do not build new schools by 2029
2.23 This scenario looked at the house building proposed within the area, analysing the
impact of the pupils from those new homes integrating into existing schools, based on
existing catchment areas. 
2.24 The table below looks at the number of permanent spaces within the schools. Those
with an asterisk also have temporary spaces, created through the inclusion of modular
units within the school grounds. These are generally not analysed as part of roll
projections as they can be moved if they are no longer required. To include them would
make a school look less efficient, when the removal of the units is manageable. 
School Capacity 2029 Projected
Occupancy
Percentage of
spaces utilised Page 316 of 454

Page 317

Muir Street PS 349 207 59%
Berryhill PS 292 242 83%
OLSF PS* 315 265 84%
Knowetop PS 534 447 84%
St Thomas’ PS 292 264 90%
Cathedral PS 548 511 93%
Keir Hardie PS* 217 204 94%
Glencairn PS* 367 392 107%
Table 2.24: Scenario 1 - 2029 projections
2.25 The table above shows that Berryhill, Our Lady and St Francis (OLSF), Knowetop and
St Thomas’ primary schools are projected to be operating within optimal levels, should
the houses come forward as projected and no new school provision is created by this
time. 
2.26 Cathedral PS would be operating at slightly above optimal levels, but still have capacity
and flexibility, due to the size of the school. 
2.27 Keir Hardie and Glencairn primary schools both have modular accommodation which
is not accounted for within the above projections. If included, Keir Hardie would be
operating at 76% capacity, and Glencairn would be operating at 85% capacity, both of
which are within optimal levels. 
2.28 Muir Street is the outlier, operating at 59% capacity which is below optimal levels. It
should be noted that the proposed new school provision would each have a capacity of
217 pupils. This is noted to illustrate that, with a projected number of 207 pupils, it is not
that Muir Street has low pupil numbers, but rather that the school has far too many
spaces for current and future requirements. The optimal solution for this school would
be to remove classrooms from the school and reallocate them for other community
and/or educational needs, as promoted through the SARIS school strategy, reported
through previous Policy and Strategy Committee meetings. 
Scenario 2 – Open the new schools in 2029 – using ‘as consulted on’ catchment areas 
2.29 This scenario looked at the house building proposed within the area, analysing the
impact of the pupils from those new homes integrating into new schools, based on the
catchment areas consulted on and approved in May 2021.
2.30 Similar to scenario one above, the table below looks at the number of permanent
spaces within the schools. Those with an asterisk also have temporary spaces, created
through the inclusion of modular units within the school grounds. These are generally
not analysed as part of roll projections as they can be moved if they are no longer
required. To include them would make a school look less efficient, when the removal of
the units is manageable. 
2.31 Different from scenario one above, there are now two new schools which have
redistributed the pupils from their current schools to their new schools. It is accepted
that a significant number of pupils may choose not to move schools. However, there is
no clear number or percentage which can be attributed to those that may stay in the
school they currently attend. Therefore, this could be viewed as a “worst case scenario”.
However for each pupil that stays at their existing school, would be one pupil less in the
projections for the new schools. 
Page 317 of 454

Page 318

School Capacity 2029 Projected
Occupancy
Percentage of
spaces utilised
Muir Street PS 349 164 47%
OLSF PS* 315 148 47%
Keir Hardie PS* 217 155 71%
Cathedral PS 548 407 74%
Knowetop PS 534 404 76%
Berryhill PS 292 240 82%
Ravenscraig ND 217 180 83%
St Thomas’ PS 292 261 89%
Glencairn PS* 367 362 99%
Ravenscraig Den 217 233 107% 
2.32 It is noted that for Keir Hardie, through to St Thomas’s, the projections look to have
occupancy levels within the ‘optimal’ range. If this option was taken forward, the
modular units at Keir Hardie would not be required. 
2.33 For Glencairn PS, as with Scenario 1, as there is modular accommodation within this
establishment, which is not counted within the figures outlined above, the occupancy
levels, when including the modular units, would show the school to be 79% occupied,
so within optimal range.
2.34 For both OLSF (which also currently has modular units) and Muir Street primary
schools, both of these schools are projected to fall below 50% occupancy making them
very inefficient and vulnerable to closure. 
2.35 Finally, the Ravenscraig Denominational school would be beyond capacity, if all pupils
appeared as modelled. As outlined above, this is unlikely to be the case in the short
term, but it is unclear how the projections would change as more housing is brought
forward within the catchment area. There is not enough information at this time to
determine what the long-term requirements would be. It is possible that a significant
number of pupils would choose to stay where they are at present or put in placing
requests at existing schools in future years. Parental choice, through placing request
provide a significant level of uncertainty to roll projections. It cannot be clear, until a
school is established over a significant number of years, how parents’ choice will affect
and impact on the school populations within the local area. 
Scenario 3 – Open the new schools in 2029 – using ‘alternative’ catchment areas 
2.36 This scenario looked at the house building proposed within the area, analysing the
impact of the pupils from those new homes integrating into new schools, based on
alternative catchment areas to those consulted on and approved in May 2021. 
2.37 Due to the disparity of distribution when using the ‘as consulted on’ catchment areas, it
was viewed worthwhile to attempt to redraw the catchments to create a better balance.
Specifically, an attempt to address the results affecting Keir Hardie, Muir Street, and
the new Ravenscraig Denominational primary schools.
2.38 There were constraints, including recognition that natural boundaries (such as roads,
or streets) should be used where possible. The conclusion was, with the projected
number of homes forecast to be built between now and 2029, there was no clear optimal
boundary to prevent adverse impacts on some schools. Page 318 of 454

Page 319

2.39 Below is the result of the option explored, by moving some catchment areas so
distribute the pupils more evenly. As you’ll note from the table below, there were still
issues with the results. 
School Capacity 2029 Projected
Occupancy
Percentage of
spaces utilised
Muir Street PS 349 202 58%
OLSF PS* 315 220 70%
Keir Hardie PS* 217 165 76%
Cathedral PS 548 423 77%
Knowetop PS 534 406 76%
Berryhill PS 292 239 82%
Ravenscraig ND 217 122 56%
St Thomas’ PS 292 260 89%
Glencairn PS* 367 367 100%
Ravenscraig Den 217 150 69% 
2.40 It is observed from the results above, by proactively moving catchment boundaries to
ensure existing schools are less vulnerable, there is a negative impact on the numbers
for the two newly created schools. 
2.41 It should also be noted that the projections are based on all pupils moving to the school,
when their house moves into a new catchment area. As outlined above, there will be
a significant number of pupils who may not choose to make this change and stay where
they are currently. 
2.42 There is a real risk, with implementing this option, that the council will open two schools
which would remain extremely under occupied, with a strong possibility that the
Ravenscraig ND school could open with less than 50% of spaces occupied. Should
future house building slow and not materialise, there is a risk that this school would
remain below optimal levels and create over capacity in this local area.
Options Appraisal – Conclusion: No identified need for new school by 2029 
2.43 Based on the data outlined above, there is a risk with building the schools by 2029. The
impact on the existing school estate is unpredictable, as are the numbers which could
occupy the new school. It is also assuming that all housing that is targeted to be
delivered between now and 2029 is delivered. 
2.44 Given that Option One indicates that, should the housing come forward as currently
projected, and should the pupils materialise as predicted, there is adequate provision
within the existing school estate to accommodate pupils up to and beyond the year
2029. 
2.45 As such, it is deemed a bigger risk to create the additional spaces by the year 2029,
than to not build and open the schools by this time. A summary of all options in
map/graphic form is enclosed at Appendix A. 
Options Appraisal – Discussion and conclusion regarding hub location 
2.46 As part of the options appraisal exercise, officers also assessed the benefits of the two
sites. Site one is the school site to the north of the Ravenscraig Sports Facility which Page 319 of 454

Page 320

was consulted on and approved as the location for the new community hub. Site two is
the Levelling Up Fund (LUF) site, which is to the south of “The Craig’ community park.
These are outlined at Appendix B. 
2.47 Officers identified that the size of site one (approx. 2.5 hectares in size), which is
expected to only accommodate the buildings required for two schools does not offer
the flexibility for other options which are being explored as part of this community hub
offering. Conversely, site two (approx. 7.5 hectares in size) provides significantly more
opportunities to meet the emerging needs of the council – specialist ASN provision,
cultural (theatre) offering, and social housing.
2.48 It was concluded by the officers that the LUF (7.5 hectare) site provides more
opportunity and flexibility for both current and potential future requirements for wider
council ambitions at this larger location. It is noted that, should this be agreed at Council
level, a further statutory education consultation to change the agreed location for the
new schools, would be required (at the appropriate time), to allow any new education
provision to be located at the LUF site.
2.49 Previous ground investigations were undertaken for the LUF site in November 2022 as
part of the preparation of a bid for Levelling Up Funds to support the substantial
estimated remediation costs.  It was understood that further ground investigation
surveys would be required to fully establish the extent of remediation work required and
associated costs. 
2.50 It would be the intention therefore, to now commission this further ground investigation
works which will provide a more detailed cost for remediation and how development
options could be taken forward on site to maximise the potential of the site but reduce
the overall remediation costs. 
2.51 North Lanarkshire Council currently has a legal agreement with Ravenscraig Ltd to
transfer the site identified as SC1 in Appendix B to the council for the purposes of
building new primary schools (joint campus). If, following further ground investigation
and feasibility assessment, the preferred site for future education provision is the LUF
site, then the SC1 site could potentially be developed for housing by Ravenscraig Ltd,
subject to satisfactory negotiation on the transfer of the LUF site. Prior to any formal
agreement however, the full outcome of the ground investigation must be known and a
further report to Committee will be provided providing this outcome and what the
proposals would be for development across the two sites. 
Evaluating when the new Community Hub will be required 
2.52 At present, there is no clear answer to the question as to when the community hub will
be required. Rather it is offered that the need for the new hub is directly related to the
number of houses brought forward at a rate which dictates when that additional
provision is required. As outlined in section 2.8 above, should the homes not materialise
as per the phasing (outlined in the table below) it may be that a space may be recycled
and reused by another pupil, rather than multiple spaces being required at the same
time. 
2.53 It is further noted that of the 3,448 houses proposed, only 305 of these houses, which 
Timeline Estimated number of new homes to be built
2025 – 2029 305
2030 – 2034 1048
2035 – 2039 722
2040 – 2044 833
2045 - 2049 540
Page 320 of 454

Page 321

equates to 9% of the total, are expected to be delivered by 2029. Around 1,770
additional houses are projected to be built in the following decade (between 2029 and
2039). 
2.54 As outlined earlier within this report, there have been various iterations and
amendments to the plans for this area. Indeed, there are currently plans being
considered within this area, for an AI datacentre, which would reduce the overall
number of homes by around 1,000. Whilst this change of use offers other economic
opportunities, it is mentioned to illustrate the dynamic discussions around land use
within this area, and the associated challenges this brings with projecting requirements
for pupil spaces (and the timing of new school provision).
2.55 The strategy therefore is to monitor the house building over the coming years, as this
will reduce the risk to the council and ensure that over provision is not created for pupils
within this local area. 
Alternative and Associated Consideration 
2.56 As detailed above, although there is currently no specific date as to when new and
additional mainstream school provision is required, the development of this area of the
Ravenscraig site is primarily around place making and not solely about an education
offering. The larger (7.5 hectare) site clearly provides more opportunities to meet
council ambitions.
2.57 As previously reported to Committee, part of this consideration is the provision of a
cultural offering. This is still very much dependent on the outcome of the ongoing
discussions with Historic Environment Scotland around the de–listing of the existing
Motherwell Concert Hall which is subject to a separate report to this Committee. 
2.58 Coupled with the decision on the concert hall, the Council’s Education, Children and
Families service is currently reviewing its overall approach to ASN education. Within
North Lanarkshire, ASN numbers have continued to rise through to 2026 with 19,844
pupils confirmed with ASN, equivalent to 40.9% of the school population. 
2.59 Considering the increasing numbers of children now presenting with ASN and how the
overall education estate manages this increase, of consideration is the delivery of a new
dedicated and bespoke regional ASN facility to the standard of the new Community
Hubs but dedicated to ASN education. A feasibility study on the size and scale of such
a facility is now being progressed, following approval at the recent Education, Children
and Families Committee. 
2.60 A purpose-built ASN school would deliver highly specialised, needs-led education
within a bespoke hub designed to promote learning, wellbeing, family engagement,
partnership working, and inclusion. This approach aligns with The Plan for North
Lanarkshire and the approved operating and leadership model. Such provision enables
appropriately sized classes, access to specialist facilities, sensory and therapeutic
spaces, and the flexibility required to meet a wide range of complex needs. Embedding
health and partner services within the setting enhances coordination, supports early
intervention, ensures continuity of care, and drives improved outcomes for pupils, all of
which embodies the wider principle of “Whole Family Support”. 
2.61 The absence of sufficient local ASN provision increases the likelihood of parents
seeking placements outwith the authority or within independent settings. Where it can
be demonstrated that appropriate local provision is not available, the Council is at
increased risk of unsuccessful outcomes at ASN tribunals. 
2.62 A dedicated ASN school strengthens the Council’s position by evidencing the Page 321 of 454

Page 322

availability of high-quality, needs appropriate provision within North Lanarkshire. This
reduces the risk of successful placing requests to independent or out of area schools,
limits financial exposure, and supports the Council in evidencing compliance with its
statutory duties under additional support needs legislation. 
2.63 The dedication of our employees engaged in ASN provision must also be recognised.
Daily, they deliver a level of care and education which although rewarding, can be
exceptionally demanding, and it is important that we provide them with the best possible
environment in which to provide this support. 
2.64 The intention is for a feasibility study / business case to be undertaken to determine
whether the commitment to the establishment of a dedicated ASN facility will address
the risks detailed above, deliver the anticipated revenue cost reductions and
operational efficiencies and, most importantly, improve the overall educational
experience of our most vulnerable children. 
2.65 Consequently, although the delivery of a mainstream education provision within the
Ravenscraig site does not appear to be viable at this time, there are parallel
workstreams still ongoing which will continue the regeneration of Ravenscraig and
continue with the place making ambitions for this area. 
Next steps 
2.66 It is proposed that the next steps would be to agree the LUF (7.5 hectare) site is the
correct location for the council to secure to meet both education and other related needs
within this strategic area of land within North Lanarkshire. 
2.67 It would therefore be recommended that the council commences the further site
investigations detailed above as this will then inform the development options available
at the site and the costs associated with remediation.   
2.68 In the time taken to complete the site investigation, the Council should be in receipt of
a decision from Historic Environment Scotland on the future of Motherwell Concert Hall,
there will be an outcome on the feasibility study for a new ASN facility and there may
be further clarification on housing development across the Ravenscraig site. Having all
this information available will then allow the Council to be a in a much more informed
position on the best options for development across both sites, and a further report will
be submitted to Committee outlining proposals on what future developments could
continue the place making ambitions for Ravenscraig in line with the Council’s overall
Programme of Work.
3. It is also evident that, with a proposed change for the mainstream school location,
another statutory education consultation would be required to allow the catchment
areas to be adjusted. This would be the appropriate time to identify the optimal shape
of the catchment areas, to ensure there is minimal impact on the existing surrounding
schools.
4. Measures of success
4.1 The creation of new schools, in a timely manner, in line with housing completions,
demand and to ensure both existing and new schools have sufficient capacity and
occupancy.
4.2 The continued successful delivery of the Council’s place making ambitions across the
Ravenscraig site. 
5. Supporting documentation Page 322 of 454

Page 323

5.1 Appendix A –
Graphical representation of the catchment boundaries, associated schools, and
anticipated impact on each school within the local area. 
5.2 Appendix B –
Graphic showing a version of the Ravenscraig masterplan, outlining the two sites (as
discussed within this report).
5.3 Appendix C –
Core Fact data for the existing schools outlined within this report. 
Andrew McPherson
Depute Chief Executive 
Page 323 of 454

Page 324

6. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts been discussed and agreed with
Finance?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
There is capital funding allocated within the current five year plan which may need
to be reallocated.
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☒ No ☐
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Statutory education consultations will be required as part of any proposals taken
forward as a result of this report.
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal
data?
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk
Yes ☐ No ☐
Page 324 of 454

Page 325

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Potential comms around the proposed changes in site, and potential uses of the
site for council facilities.
5.9 Risk impact   
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been    
carried out?
Page 325 of 454

Page 326

☐ No ☐ Yes
Page 326 of 454

Page 327

•
•
Appendix A 
Yep
Fa I Denominational Primary Sector
2029 projections (HLA): 
,haw
Ole
Nat,
Keeping the status quo (no new school)
•
Horeshaw Moss 
Ha 
Low Blan rye 
Bia 'Yre Coltne
Bonkle
Cnndledyke 
1111
E rnock
Hamilton
(h  n 1rgha I • � 
�llv rlon II 
F irh II
low\Vater-s
Caml:-usnethar 
t 100 
Morn1ngs1de 
Chapel 
BogS1de 
Me1k e
Earnock 
Wildmanbndge 
Law 
Limek1lnbum 
Quarter
Meadowh, 
Larkhall 
0.5 3_ 
Kilometers
• Dalserf 
Carlu
..
Page 327 of 454

Page 328

Appendix A 
Old i.tone 
ature Park
Cot 
Newarth1II 
r .,E woOCI 
ad10, 
p,. l 
Hamilton 
nowetop
"" Primary School
Capacity: 534
RP 2029: 447
Occupancy: 84% 
CJlz�II 
Cr 
Mu1rhouse
e p�G,11 
0.5 0.25 0 0.5
�--.- I I"
1.5 
lu rtioc.se
rm
Cc
Page 328 of 454

Page 329

• 
yep
•
Aston 
�1<,(, 
Fa ls 
Od 
Denominational Primary Sector
2029 projections (HLA): 
haw
Appendix A
:;;:
,::
Natu
New Ravenscraig school -  c..atchment as consulted on
Hareshaw Moss 
Ha 
<9
0
L'>VI B antrye 
la lyre
Bonkle
Crmdledyke
Ud to 
C�an hall 
.,ttle 
Hamilton
•
<;liver onh1 I 
Mornings id 
Chapel
[arnock Fairh11l 
Me �le
Earnock 
Low � er
00 
Bogs,de 
W1ldmanbridge 
Law 
Quarter 
Limek1lnbum lh
0.5
La•r hall 
c:::J 
Legend
Ravenscraig Catchment  Carlu
Kilometers
•
Page 329 of 454

Page 330

Dalserf
Page 330 of 454

Page 331

Appendix A 
Old M ne
ature PJrk Non-Denominational
2029 projections (HLA):
New Ravenscraig school -  catchment as consulted on 
Elv,y 
Co 
Cadz 
I'- l 
Hamilton
J iii
..!' Knowetop
..- Primary School 
"1u1rhouse 
0.5 0.25 0 0.5 
01 
1.5 Da el  11' 
Legend
D
Primary Sector
Page 331 of 454

Page 332

•
•
Appendix A 
Yep
Fa I Denominational Primary Sector
2029 projections (HLA): 
,haw
Ole
Nat,
New Ravenscraig school -  revised new catchment
•
Horeshaw Moss 
Ha 
Low Blan rye 
Bia 'Yre
Bonkle
Cnndledyke 
1111
Hamilton
(h  n 1rgha I • � 
�llv rlon II 
Morn1ngs1de 
Chapel
E rnock F irh II 
low\Vater-s  BogS1de 
Me1k e
Earnock 
Wildmanbndge 
Law 
Limek1lnbum 
Quarter
Meadowh, 
Larkhall 
0.5 3_ 
Legend
c::::J Revised Ravenscralg
Catchment
Kilometers
• Dalserf 
Carlu
..
Page 332 of 454

Page 333

Appendix A 
Nature Park 
rk
e
Non-Denominational Primary Sector
2029 projections (HLA):
New Ravenscraig school -  revised new catchment 
El 
e
Hamilton
Cadz v, B 
Muirhouse 
0.5 0.25 0.5 1.5 
Allantnn 
Legend
do8e'{ised Ravenscraing
Catchment
Old M ne
Page 333 of 454

Page 334

Appendix B 
Appendix B: Two site locations 
Employmtnl arus 
lnlnstructure Planting 
To'lln C•"'"'· M11td U •· Rotaot.
l•wre. Busmes.s. Crvrc, Hot I le 
� id nl l 
Neighbourhood reull/ menuy
focus. 
originally
sulted on 
..
•·•....S..2 ... 1
:
Page 334 of 454

Page 335

Appendix C 
Appendix C: Core Fact data for the eight existing schools in this local area 
School name Condition Suitability Pupil roll September 2024 Capacity Capacity Percent
Keir Hardie Memorial Primary* B B 216 217 99.5
Muir Street Primary School B B 219 332 66
Glencairn Primary School* B C 355 367 96.7
Knowetop Primary School B C 487 534 91.2
Berryhill Primary School C B 228 317 71.9
Cathedral Primary School A A 522 548 95.3
Our Lady & St Francis Primary School* B B 302 315 95.9
St Thomas' Primary School C C 219 292 75 
Core Fact Data is published by Scottish Government on an annual basis – with the table above extracted from the latest published data.
* Keir Hardie, Glencairn, and OLSF all have modular units, providing additional classrooms at these schools. These units are not included in the
capacity figures, or capacity percentages outlined above. This is in line with the Scottish Government guidance for calculating capacity, where
Local Authorities decide if temporary capacity is included or excluded from capacity returns. Due to the temporary nature of this type of
capacity, North Lanarkshire Council does not include it for the returns at any of our schools. From an operational perspective, the spaces
available for pupils at these schools equates to roughly 60 more pupil places at each school in addition to the number of spaces shown in the
capacity figures for these three schools, within the table above. Therefore the “capacity percentage” from an operational perspective, is lower
than shown.
Page 335 of 454

Page 336

Page 336 of 454

Page 337

North Lanarkshire Council  
Report
Policy and Strategy Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    IM/JMcK Date 19/03/26 
Civic Theatre & Concert Hall Update 
From  Chief Officer (Assets and Procurement)  
E-mail mckinstryj@northlan.gov.uk  Telephone  Ian Martin
07966 397637 
Executive Summary 
This report provides an update on the current position regarding progress toward the proposed
demolition of the Civic Theatre and Concert Hall within the Motherwell Civic Centre Complex. 
The building was closed in September 2023 after the identification of Reinforced Autoclaved
Aerated Concrete (RAAC) in the roof structure, with subsequent structural studies (2023–2024)
categorising the risk level as High to Critical. Repair costs for replacing RAAC only were initially
estimated at £10.5–£11.65 million. Costs have increased significantly following further detailed
technical investigations which revealed that replacing the RAAC roof would involve extensive
enabling works, along with major additional interventions to address cladding and glazing
issues, fire safety compliance, building services, thermal performance, and wider cyclical
maintenance requirements. 
Given the buildings’ Category B Listed status, demolition requires statutory approvals, including
Listed Building Consent (LBC) from Historic Environment Scotland (HES). 
As previously advised to committee, the complex nature of RAAC remediation, requiring
extensive enabling works, intrusive intervention into listed fabric, temporary structural support,
and the possibility of uncovering further hidden defects, creates substantial uncertainty in
programme, cost, and deliverability. These risks underpin the conclusion that long-term
retention or refurbishment of the building is neither technically reliable nor economically viable,
and they continue to inform the council’s approach to statutory approvals and forward planning. 
Engagement with HES has been positive, with the organisation acknowledging the council’s
detailed structural evidence, conservation assessment, and cost viability analysis. Updated
feasibility, conservation, and cost evaluations prepared by consultants Pick Everard and MAST
Architects conclude that full repair and refurbishment, while technically possible, would require
extensive intervention, carry substantial risks, and result in a significant conservation deficit.
This deficit arises because the cost of undertaking the necessary repairs and conservation
works would far exceed the building’s end value once restored, leaving a financial shortfall that
makes the project economically unviable without substantial external funding. 
Item 13
Page 337 of 454

Page 338

1. Background 
1.1 The Civic Theatre & Concert Hall was surveyed in September 2023 as part of the
council’s Reinforced Autoclaved Aerated Concrete (RAAC) inspection programme and
RAAC was identified in the roof area. There were signs of water ingress noted that
could weaken the load bearing capacity of the panels and the report recommended the
immediate closure of the facility due to the condition of the panels.
1.2 A further Structural Feasibility Study was undertaken on the council’s behalf by Pick
Everard in March 2024 and this report categorised the condition of RAAC within the
premises as High to Critical Risk. 
1.3 At that time, it was estimated that the capital funds required to repair the facility would
be between £10.5M and £11.65M, however it was noted that there remained significant
risks associated with the complex works that could result in additional costs. 
1.4 In light of the above, the Policy and Strategy Committee at its meeting on 5th December
2024, approved a report recommending that the Civic Theatre and Concert Hall be
demolished.   
The council is currently finalising the preparation of the Planning Statement, technical
documentation and LBC application for submission in May 2026. Risks remain regarding HES
determination and potential call-in by Scottish Ministers. If approvals are granted, the full
demolition and reinstatement programme is expected to take at least 20 months, including
creation of new parking areas, landscaping, and integration of design elements sympathetic to
the retained Civic Centre. 
Recommendations
It is recommended that the Policy and Strategy Committee: 
(1) Acknowledges the substantial work completed to date in preparing the necessary
documentation to support forthcoming Planning and Listed Building Consent
applications for the demolition of the Civic Theatre and Concert Hall, and the intention
to submit these applications in May 2026.
(2) Acknowledges the work being undertaken to re-design external elements of the Civic
Centre Complex following the demolition of the Civic Theatre & Concert Hall.
(3) Recognises that the demolition of the Civic Theatre and Concert Hall is conditional on
the council obtaining the necessary statutory consents.
(4) Acknowledges the risks associated with RAAC projects and that budget allocation will
require to be kept under review, with further capital funding likely to be required in future
plans. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (22) Facilitate a North Lanarkshire wide approach to asset
rationalisation, including with communities and partners
Programme of Work Statutory / corporate / service requirement 
Page 338 of 454

Page 339

1.5  The report noted that the entire Civic Centre Complex is Category B Listed and this
includes the Civic Theatre & Concert Hall. Any demolition would therefore be
conditional on agreement from Historic Environment Scotland (HES). 
1.6 Following the Committee decision the council has been working with consultants MAST
and Pick Everard to produce costs and feasibility reports and a conservation report to
support an application for Listed Building Consent (LBC) to allow for the building’s
demolition. 
1.7 As outlined in the School Estate: Strategic Capital Update report presented to
Committee in December 2025, a further update on the Civic Theatre and Concert Hall
demolition was scheduled for Cycle 1 2026. This report has been prepared to fulfil that
requirement. 
2. Report 
Historic Environment Scotland 
2.1 The Civic Centre Complex was Category B listed by HES in December 2020. The listing
excludes the interiors of the 6-storey office block, adjoining ranges and Civic Square,
together with the glazed stair tower addition to the council chamber, lift shafts, metal
fire-escape and service addition to the fly tower. The Civic Theatre and Concert Hall,
including the interiors (with the exception of the metal fire-escape and fly tower), are
therefore included within the listing. 
2.2 Category B listed buildings are defined by HES as buildings of special architectural or
historic interest that are major examples of a particular period, style or building type. 
2.3 The Statement of Special Interest identifies the Civic Centre Complex as being of
special architectural and historic interest due to its significance as a largely intact
example of post-war Modernist civic architecture, its high-quality design and plan form
by an important Scottish architect, its landmark status within Motherwell, and its
contribution to understanding civic life and local governance in 20th-century Scotland. 
2.4 Under the Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997,
any works that impact the special interest of a listed building, including alterations or
demolition, must obtain LBC. Although LBC applications are typically decided by the
local planning authority, this responsibility can transfer to HES when the authority itself
owns the building. 
2.5 HES guidance on the demolition of listed buildings states that demolition should be
treated as a last resort, following the consideration and discounting of all reasonable
alternatives. The guidance identifies four circumstances where demolition may be
acceptable, subject to clear justification, including where a building is incapable of
meaningful repair or where repair and reuse are not economically viable. The four
circumstances:   
• The building no longer of special interest. 
• The demolition of the building essential to delivering significant benefits to
economic growth or the wider community.
• The building is incapable of meaningful repair.
• Economic Viability where the demolition and reuse of a listed building is being
considered on the grounds that it is not economically viable. 
Page 339 of 454

Page 340

2.6 In this case, the ability to meaningfully repair the Civic Theatre and Concert Hall is
affected by the extent of RAAC within the roof structure and the consequential impact
of repair works on listed internal elements. In addition, the economic viability test
requires demonstration of a conservation deficit where repair costs significantly exceed
the end value of the building. 
2.7 Although the guidance normally expects marketing of a listed building prior to
demolition, this is not considered feasible due to the safety risks associated with RAAC
and the building’s functional and physical integration within the wider Civic Centre
Complex. The guidance also confirms that marketing alone is not determinative and
that demolition decisions should be informed by a broader assessment of alternative
options and economic viability. 
2.8 Officers have been engaging with HES since April 2024, providing the Structural
Feasibility Study and outlining the RAAC issues. HES encouraged exploration of repair
options and potential funding opportunities, with demolition to be treated as a last
resort. 
2.9 As part of the viability assessment, the Council is required to address the following key
questions: 
• why demolition is being pursued;
• how the demolition would be undertaken;
• how the interface with the retained Civic Centre Complex would be treated; and
• the proposed future use of the site. 
2.10 The council has appointed a conservation consultant to represent the council in
discussions with HES and to assist in the preparation of a detailed planning statement
in support of the council’s case for LBC. In addition, Pick Everard were appointed to
evaluate the type, methodology and amount of repairs and upgrades required (not
limited to RAAC as per previous reports) in order to demonstrate ‘conservation deficit’
in repair cost versus the market value of the end product. 
Cost & Feasibility Study 
2.11 Following a review of the information contained within the two previous surveys detailed
at 1.1 and 1.2 above, undertaken with the conservation consultant, it became apparent
that further work was required to fully understand the extent of the technical constraints
and associated costs related to the removal of RAAC. This illustrates the complexity of
RAAC projects. 
2.12 This additional work was also necessary to identify and cost other essential remedial
works required to fully reinstate the building, outlined at 2.19 below, which had not been
considered previously, as earlier surveys focused on RAAC replacement costs. 
2.13  The council appointed Pick Everard to prepare cost estimates and feasibility reports to
develop a more detailed understanding of the required works and associated costs,
thereby informing the decision-making process on the proposed way forward. 
2.14 The information contained within the reports was necessary to evidence a conservation
deficit in support of the case for demolition. 
2.15 The feasibility report provides a detailed assessment of the works required, in addition
to RAAC replacement, to enable the building’s return to productive use.
Page 340 of 454

Page 341

2.16  In assessing costs Pick Everard were asked to look at three scenarios which are
detailed below along with the respective cost estimates: 
Scenario 1: Replacement of RAAC and Refurbishment - £31.4m - £34.7m.
Scenario 2: Demolition - £3.2m – £3.55m
Scenario 3: Demolition + Car Park Implementation (Basic Scheme) - £5.21m - £5.76m. 
Conservation Consultant 
2.17 Discussions were held with MAST Architects, and a site meeting took place in March
2025 to review the council’s requirements. 
2.18 MAST Architects were appointed in Spring 2025 to support the procurement of detailed
technical surveys, cost estimates and professional commentary, enabling a robust
assessment of the scope of works, the implications for the heritage significance of the
listed building, and the combined cost of these works in the context of known and
anticipated cyclical repair and maintenance liabilities. 
2.19 The further investigations demonstrated that replacement of the RAAC roof would
necessitate extensive enabling works, including asbestos removal, dismantling and
protection of historic features, removal and reinstatement of services and plant, major
temporary works, and interventions to the primary concrete and steel structure. In
addition, significant associated works would be required to address cladding
deterioration, glazing, fire strategy compliance, building services, thermal performance
and wider cyclical repair liabilities. 
2.20 Given the building’s highly specialised layout, listed status, constrained location within
the wider civic complex and limited commercial appeal, its end value is assessed as
being substantially lower than the cost of repair, resulting in a significant conservation
deficit. Marketing or transfer to a restoring purchaser was considered not to be feasible. 
2.21 While repair and refurbishment is technically possible, the investigations identified very
high levels of risk associated with building stability, safe access, asbestos
contamination, potential loss of historic fabric and prolonged timescales required to
secure statutory consents. There is also a material risk that the extent of deterioration
is greater than can currently be verified, which could result in further cost escalation. 
2.22 An appraisal of alternative options concluded that doing nothing, sale, conversion, or
partial demolition are not viable or deliverable solutions. Demolition and landscaping
has therefore been assessed as a contingency option should repair and reuse not be
achievable. 
2.23 The investigations demonstrate that the scale of RAAC related failure, the extent of
necessary intervention, the high likelihood of heritage loss during repair, and the
exceptional capital costs involved mean that repair and reuse cannot reasonably be
considered economically viable. 
2.24 The report concludes that demolition of the Motherwell Concert Hall and Civic Theatre
may be justified in exceptional circumstances, subject to Listed Building Consent. 
2.25 A meeting took place in November 2025 between representatives of HES, the Council
(Assets & Procurement and Planning) and the Conservation Consultant to consider the
findings of the cost and feasibility reports alongside the conservation report. The
engagement with HES was positive, with officers indicating that they were satisfied with
the depth of analysis and level of detail provided by the Council and its consultants in
Page 341 of 454

Page 342

evidencing the case for demolition. During the meeting, opportunities to further
strengthen the conservation report were identified, and additional work has since been
undertaken to address these points. 
2.26 The anticipated sequence of events to obtain the required statutory consents to
progress the demolition are detailed in the table below: 
Completed Actions Timeline
Initial Engagement with HES April 2024
RAAC Report to P & S Committee December 2024
Identification of Planning Consultant –
MAST Architects
February 2025
Initial site meeting with MAST March 2025
Preparation of MAST Scope  March 2025
MAST Proposal Return April 2025
MAST Appointment  Spring 2025
Justification for Demolition - MAST October 2025
Interim Historic Environment Scotland
Review
November 2025
Actions in Progress 
Update Report to Policy and Strategy
Committee
March 2026
Finalisation of Proposals for Site
Including Retention of Key Features
March 2026
Finalisation of Planning Statement
and associated documentation
April 2026
Application for Planning Permission &
Listed Building Consent
May 2026
Application for Demolition Warrant TBC
Determination of Listed Building
Consent Application
TBC
Notification of Outcome TBC 
2.27 The timescales noted above are indicative at this stage and are largely dependent on
the response from HES and the requirements of utility providers including Scottish
Water, which are out with the council’s control. Timescales cannot be provided for a
number of the steps above as they will be dependent on receipt of Planning Permission
and LBC approvals. 
Page 342 of 454

Page 343

2.28 There is a risk if HES objects to the listed building consent Scottish Minsters may
choose to ‘call in’ the case and could decide to hold a public enquiry. There is no right
of appeal unless the council could demonstrate an error in coming to their decision. 
2.29  The LBC and Planning consents, if granted, would lapse after a period of three years
from the date of the decision notice unless the works have commenced within that
period. 
Initial Artist Impressions 
2.30 Concurrently with the demolition consent work above, the in-house Technical & Design
team are developing the proposals for the replacement car park scheme with
assistance from an external civil engineer and the council’s Planning & Transportation
team. 
2.31 The council’s Technical and Design team have created some artist impressions which
show how the external elements of the Civic Centre Complex that will be impacted by
the demolition could be treated. See Appendix 1.
2.32 The treatment of the external areas will require detailed discussions and agreement
with HES and will most likely be subject to further change throughout the process.
2.33 The impressions show additional car parking, soft & hard landscaping and new steps
leading from the main car park to the existing terrace. In addition, remedial work to the
retaining walls and parts of the Civic Centre Complex that will be physically separated
as a result of the demolition and landscaping are also shown.
2.34 The design enhances the aspect of the approach to the elevation in a more
aesthetically pleasing way and could incorporate materials from the Civic Theatre and
Concert Hall to provide a sympathetic treatment to the external elements and a nod to
the site’s previous use.
2.35 The successful completion of the actions detailed at 2.26 above would allow for the
demolition programme to commence. It is anticipated that the demolition from
commencement of the programme to conclusion will take around one year.
2.36 The works to re-develop the cleared site following the demolition, as illustrated at
Appendix 1, will take a further six to nine months to conclude giving a total timeline of
at least 20 months from commencement of the demolition programme to the provision
of a useable car parking area.
2.37 The timescales are dependent on utility providers i.e. Scottish Water and SPEN
requirements and assumes that there are no unforeseen delays or complications with
demolition works. This would require to be kept under review.
Costs
2.38 Whilst the final costs cannot be determined until after the tender process has been
conducted the indicative costs are summarised below. 
2.39 The demolition costs are estimated to be in the region of £3.22M and £3.55M
2.40  The works to treat the external elements of the Civic Centre Complex following the
demolition including the creation of the additional car parking, new access points and
landscaping are estimated to cost £1.99M to £2.21M.
Page 343 of 454

Page 344

2.41 The total costs for the demolition and re-instatement works are therefore likely to be in
the region of £5.21M and £5.76M.
2.42 All costs outlined above are based on current estimates provided by Pick Everard and
may be subject to change once the works are finalised and formally tendered. Costs
may also be revised as demolition method statements are completed and a detailed
car park design is developed.
2.43 Full budget provision for the above works is not allocated within the current capital plan
and provision would require to be made in the updated capital plan going forward. 
3. Measures of success 
3.1 Obtaining the required statutory consents to allow for the demolition to proceed. 
3.2 Demolition will address the health and safety issues associated with the presence of
RAAC within the building.   
3.3  The successful re-purposing the areas within the Civic Centre Complex that are
impacted by the demolition of the Civic Theatre & Concert Hall. 
4. Supporting documentation 
Appendix 1 – Artists Impressions. 
James McKinstry
Chief Officer (Assets and Procurement)  
Page 344 of 454

Page 345

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☒  
If Yes, please provide a brief summary of the impact? 
Full budget provision for the works has not been allocated within the current capital
programme and provision would require to be made in an updated capital plan
going forward. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒  
The council has a statutory obligation to comply with the Community Empowerment
(Scotland) Act 2015 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐  
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒
Page 345 of 454

Page 346

If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The demolition of any property will assist in reducing the council’s carbon footprint 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The issues associated with RAAC are being managed locally by services in relation
to service and operational impact. RAAC management plans have been adopted
for all relevant buildings where operations continue. 
The timescales outlined within the report are indicative and subject to obtaining
HES approval and the required statutory consents. If LBC is not granted there is a
risk that the demolition may not be able to proceed and the council would require to
re-assess alternative options. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒
Page 346 of 454

Page 347

If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 347 of 454

Page 348

Appendix 1 – Artists Impressions 
Aerial View 
New Stairs from Car Park 
Page 348 of 454

Page 349

Civic Café 
Page 349 of 454

Page 350

Page 350 of 454

Page 351

North Lanarkshire Council Report 
Does this report require to be approved? ☒ Yes  ☐ No
Ref FS/RMS/P&S/Mar26 Date 05/03/26 
From Francis Scott, Chief Officer (Audit and Risk)
E-mail scottfr@northlan.gov.uk Telephone 07887 914207 
Executive Summary 
The purpose of this report is to present the revised Risk Management Strategy for
consideration and approval.
The Council’s Risk Management Strategy sets out a clear direction for how the Council will
develop its risk management arrangements to support achievement of the Council’s
objectives and The Plan for North Lanarkshire. The previous version of the Strategy was
approved by the Policy and Strategy Committee in March 2023. 
Effective risk management arrangements form an important element of good corporate
governance and are designed to ensure that the Council operates systematic and logical
processes for managing uncertainty within a comprehensive framework, ensuring that
identified risks are managed consistently, effectively, efficiently and coherently across the
Council. 
The Audit and Scrutiny Panel has oversight of the Council’s risk management
arrangements and receives regular reports on risk management issues and changes to
corporate and service risk registers. 
Recommendation
It is recommended that the Policy and Strategy Committee: 
(1) Approve the revised Risk Management Strategy (at Appendix 1); and 
(2) Endorse the role of the Audit and Scrutiny Panel in providing ongoing elected member
oversight of the Council’s risk management arrangements. 
The Plan for North Lanarkshire
Priority All priorities
Ambition statement All ambition statements
Programme of Work All Programmes of Work
Policy and Strategy Committee
Risk Management Strategy
Item 14
Page 351 of 454

Page 352

1. Background 
1.1 The Council is responsible for the delivery of a wide range of public services and has
set out a range of objectives, priorities and ambitions in The Plan for North Lanarkshire
and the Programme of Work. The Council operates in an increasingly uncertain and
complex environment and faces multiple challenges in delivering against its priorities.
Effective risk management arrangements will ensure that the Council is more likely to
achieve its goals and planned outcomes. 
1.2 A risk can be anything that may impact on what the Council is trying to achieve. Risk
management is about having formal arrangements and processes in place to identify
what those uncertainties might be, to assess their potential consequences and to
decide how best engage with them. 
2. Report 
2.1 The Risk Management Strategy is intended to ensure that the Council is risk aware,
rather than risk averse, and that the management of risk is embedded in the Council’s
policies, procedures, culture and practices. It is also designed to ensure that key
decisions are taken with an understanding of risks and their effective control. The
revised Risk Management Strategy is attached at Appendix 1. 
2.2 The Strategy reflects the Council’s continuing risk management maturity by building on
the work carried out since the previous version was approved in 2023. It outlines the
approach to the identification, assessment and management of risk, and includes
guidance for officers on their roles and responsibilities in relation to risk. The review of
the Strategy has also been informed by informal benchmarking and consultation with
other local authorities through the Association of Local Authority Risk Managers
(ALARM) Scotland group, to ensure consistency of approach and to benefit from
learning opportunities. 
2.3 The revised Strategy includes three key development initiatives which will further
strengthen the risk management arrangements. These initiatives will be implemented
across the three-year term of the strategy and include: 
• Ever-Present Risks – it is recognised that there are some corporate risks that
tend to be static in terms of assessment and have already implemented controls
and actions. We will explore the development of a method of recording and
treating these risks which has a focus on developing enhanced assurance in
relation to the control environment and for ongoing management awareness and
continuous improvement.
• Opportunity Management – opportunities are areas of uncertainty that could
have a positive impact on the achievement of objectives, and promoting the
inclusion of opportunities within risk registers is recognised best practice. When
opportunities are formally captured and managed within risk registers, it can
support informed decision making on whether, and how, to maximise potential
benefits. We will develop our risk register infrastructure to record opportunities
alongside risks.
• Risk Appetite – during the term of this strategy, we will explore emerging
methodologies to further develop our application of risk appetite to enhance our
overall risk management arrangements.
Page 352 of 454

Page 353

2.4 Risk registers continue to represent a core element of the Council’s risk management
processes at both corporate and service levels, and the Strategy includes guidance on
how risk registers should be compiled, reviewed and challenged.
2.5 Elected member oversight of the Council’s risk management arrangements is
undertaken by the Audit and Scrutiny Panel, who receive details on changes to the
Corporate Risk Register, summaries of Service Risk Registers and updates on all
relevant risk management developments, including progress with the key development
initiatives noted above. 
3. Measures of success 
3.1 Effective risk management arrangements increase the likelihood of the Council
achieving its planned outcomes, priorities and ambitions. Internal Audit provides
independent assurance to senior management and the Audit and Scrutiny Panel on the
Council’s risk management arrangements. 
4. Supporting Documentation 
Appendix 1 – Risk Management Strategy 
Francis Scott
Chief Officer (Audit and Risk) 
Page 353 of 454

Page 354

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts been discussed and agreed with
Finance?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal
data?
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk
Yes ☐ No ☐
5.6   Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes   ☐ No ☒
If Yes, please provide a brief summary of the impact?
Page 354 of 454

Page 355

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact   
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Effective risk management arrangements will enable the Council to manage its
risks more effectively, increasing the likelihood of the Council achieving its plans
and ambitions by minimising or mitigating potential threats to planned outcomes. A
robust Risk Management Strategy lays out the framework and underpins all risk
management activity across the organisation.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 355 of 454

Page 356

RISK MANAGEMENT STRATEGY 
AN ENTERPRISE WIDE APPROACH TO RISK MANAGEMENT
Page 356 of 454

Page 357

Document Control
Title Risk Management Strategy 2026-2029
Owner Francis Scott, Chief Officer (Audit & Risk) Contact ScottFr@northlan.gov.uk
Governance Group Risk Management Corporate Working Group / Corporate Management Team
Author Donald Stone, Corporate Risk Manager Contact StoneD@northlan.gov.uk
Revision History
Number Originator Date Review Commenced Revision description / record of change
Original strategy Ken Adamson 2012 -
1.0 Ken Adamson 2017 Review
2.0 Lauren Anthony 2019 Planned refresh
3.0 Lauren Anthony December 2022 Planned refresh
4.0 Donald Stone November 2025 Planned refresh
Document approvals
Number Governance Group Date approval granted Date approval to be requested
(If document still draft)
Original strategy Policy & Resources Committee September 2012
1.0 Policy & Resources Committee June 2018
2.0 Policy & Strategy Committee March 2020
3.0 Policy & Strategy Committee March 2023
4.0 Policy & Strategy Committee March 2026
Consultation Record (for most recent update)
Status of document consulted upon Risk Management Strategy 2026-2029
Stakeholders consulted / date Risk Management Corporate Working Group, November 2025 - February 2026. BMT - February
2026.
Strategic Alignment
The risk management strategy outlines the council’s approach to the management of risk as part of robust corporate governance
arrangements designed to enable and support the delivery of all council ambitions and priorities.
Next review date
Review date December 2028 Page 357 of 454

Page 358

3
Risk Management Strategy 2026
Contents
Page
Foreword       04
1 Introduction       05
2 Embedding Risk Management       06
3 Risk Management Application       07
4 Risk Registers          08
5 Risk Management Governance, Leadership and Accountabilities    09
6 The Three Lines Model       14
7 Risk Management Structure        16
8 Risk Management Methodology         17
9 Risk Reporting, Review and Challenge         18
10 Training and Development          20
11 Key Initiatives for Development in 2026-2029    21
12 Risk Management Guidance        22 - 39
Page 358 of 454

Page 359

4
Risk Management Strategy 2026
Foreword
The Council is ambitious in its vision for North Lanarkshire. We are equally ambitious in
developing our risk management arrangements in line with best practice to ensure they
support delivery of our ambition for North Lanarkshire to be the place to Live, Learn, Work,
Invest and Visit.
The Council operates in a complex environment
and faces multiple challenges in delivering against
its priorities. Effective and efficient risk management
arrangements will enable us to engage with
uncertainty in a manner that directly supports
delivery.
This strategy sets out a clear direction for how we
will develop our risk management arrangements to
support quality public services and delivery of The
Plan for North Lanarkshire.
It provides our high level ambitions for enhancing
risk management capability, building on our existing
framework with three key initiatives. These are,
exploring an alternative approach to engaging with
“ever-present risks”, expanding our risk registers to
record opportunities and developing our practices in
relation to risk appetite.
By implementing these initiatives and developing
the operational guidance that supplements this
strategy, we believe that effective risk management
will continue to play a significant part in helping the
Council deliver our ambitions and making North
Lanarkshire the place to Live, Learn, Work, Invest
and Visit.
Councillor Jim Logue
Leader North Lanarkshire Council
Des Murray
Chief Executive
North Lanarkshire Council
Page 359 of 454

Page 360

5
Risk Management Strategy 2026
1 Introduction
1.1  The purpose of this Strategy is to set out the
Council’s vision for risk management and to
provide a framework to ensure that across
the organisation, we manage risk in a manner
consistent with good practice. The Strategy
provides a supporting framework to ensure the
key elements of risk management processes
are in place, enabling risks to be dealt with
and managed at the appropriate level of the
organisation.
1.2  This Strategy is designed to provide the
information and guidance necessary to assist
the organisation in identifying, evaluating,
managing, and monitoring risks that might
impact on achievement of the Council’s plans,
ambitions and objectives and the delivery of
quality public services.
1.3  The Strategy has been developed in
accordance with the CIPFA/SOLACE local
code of corporate governance, “Delivering
Good Governance in Local Government”
and the Audit Scotland, “Best Value tool kit:
Risk Management” which recognises risk
management as an integral part of good
corporate governance, and in accordance with
the International Risk Management Standard
ISO31000 (2018) “Risk Management –
Guidelines”.
1.4  Risk Management Standard: ISO 31000
describes risk management as ‘the
coordinated activities to direct and control an
organisation with regard to risk’. It covers the
processes involved in identifying, assessing,
and prioritising risks, assigning ownership,
taking proportionate management action, and
monitoring and reviewing progress.
1.5 We will continue to embed risk management
in the way we do business, the way we
make decisions, and in our relationships with
partners and suppliers.
1.6 For the purposes of this Strategy, it is useful to
refer to how “risk” is defined in the International
Risk Management Standard. ISO 31000
defines risk as “the effect of uncertainty on
objectives”.
Risk can therefore be characterised as an
event or set of events, which should it occur,
will have an impact on the achievement of
objectives. In other words, risk is “uncertainty
that matters”. Risk is measured by the
combination of the “likelihood” of the event
occurring, and the “impact” on objectives if it
does. The impact can be negative or positive.
• Risks can either be threats or opportunities.
Threats could have a potential negative effect
on objectives, while opportunities could
have a potential positive effect on objectives.
During this strategy period, we are committed
to evolving our approach to incorporate
the identification and management of
opportunities.
• An Issue can be described as a live event or
one that we know is certain to occur. An issue
may have arisen because a risk has not been
identified or has been identified but has not
been managed effectively, or circumstances
have changed to make a risk become an
issue.
Key Benefits of Effective Risk Management
Enables and evidences robust and defensible, best value
decision making, demonstrating openness, accountability and
good governance.
Decision making is risk aware rather than risk averse, enabling
acceptance of certain risks to achieve particular goals.
Enables better use and prioritisation of Council resources to
achieve corporate priorities and enhance service delivery.
Reduces adverse events, and enables effective and more
proactive management of those that occur, reducing time
spent “fire-fighting”.
Enables identification and maximisation of opportunities and
encourages innovation.
Positively contributes to the Council’s reputation as an
employer and service provider.
Provides protection to all stakeholders.
Page 360 of 454

Page 361

6
Risk Management Strategy 2026
2 Embedding Risk Management
2.1  Enterprise Risk Management is a holistic
approach which recognises the link between
uncertainty at different levels and areas of
activity of the organisation, including those
arising from relationships and contracts
with other parties outwith the Council.  This
Strategy applies to the management of
uncertainty across all areas of activity of the
Council and incorporates both a “top down”
and “bottom up” approach.
2.2  Embedding risk management within the
Council will be achieved through application of
the risk management process, and using risk
registers as a management tool to record and
manage uncertainties that matter. This process
will be applied at all levels of the Council and in
our dealings with third parties and partners.
• Corporate Risks are those which could
impact the Council in achieving its Priorities
and objectives. These are strategic in nature
and require corporate oversight or are cross-
cutting across many services. The Corporate
Risk Register (CRR) may also include
significant Service level risks which have been
escalated for attention at a strategic level.
• Service/Team Risks are those risks which
could impact upon a Service or Team in
achieving its objectives.  Team risks may be
escalated to Service level as determined by
application of the Risk Management process,
with service risk registers reflecting an
amalgamated position of risks from different
teams within a service. Service risks which are
deemed to be significant may be escalated
to the CRR in accordance with the Risk
Management process.
• At a programme level the Programme
Uncertainty Level Status Evaluation
(PULSE) process seeks to identify elements
of uncertainty in programme delivery,
interdependencies between project activities
within programmes of work and help to inform
strategic decision making. More information on
the PULSE process is available in programme
governance board documentation and
guidance.
• The council’s Project Risk Management
approach and methodology is designed to
identify and manage those risks and issues
which could threaten delivery of the project,
or compromise cost, quality or timescales.
Key responsibilities with regard to risk
are specifically laid down in the Project
Management framework.
Page 361 of 454

Page 362

7
Risk Management Strategy 2026
3 Risk Management Application
By applying the Risk Management process we develop a better understanding of
uncertainties that matter. This informs our decisions on how best to engage with those
uncertainties and enables a culture that is risk aware rather than risk averse.
3.1 Risk Management is a cyclical process and
will be applied across the organisation in
line with this framework. We operate in an
increasingly Volatile, Uncertain, Complex
and Ambiguous (VUCA) environment and so
exploring uncertainty that could impact on
the achievement of objectives is especially
important.
• When delivering transformational change;
• At the beginning of and during the lifecycle of
projects;
• When entering into partnership working;
• During budget setting exercises;
• During service review and/or structure
changes;
• As part of procurement exercises;
• Following political change;
• As part of strategic and service planning and
decision-making processes.
• Following a change in the regulatory
environment. For example, during the period
of this strategy we will need to assess our
control environment for Fraud Risk in line with
the requirements of the Economic Crime and
Corporate Transparency Act 2023 (ECCTA).
Risk Management and the
Strategic Planning Process
3.2 Our aspiration is for the Council’s risk
management processes and activities to
further develop the symbiotic relationship with
Strategic and Service Planning activities, taking
into account ‘The Plan for North Lanarkshire’
and associated Programmes of Work, as
well as individual Service Plans. The following
outlines how this will be achieved:
• The ongoing consideration of horizon
scanning activity and materials to identify
areas of uncertainty that may affect the
delivery of objectives at each level of the
organisation. This will be supplemented by
an annual exercise incorporating relevant risk
survey publications as a means of exploring
uncertainty in the external environment facing
the Council, as well as consideration of other
similar authorities’ corporate risk registers;
• At a strategic level, the Corporate Management
Team will regularly consider the CRR to ensure
coverage and appropriate treatment of key
areas of uncertainty;
• Regular consideration of any Service risks 
proposed for escalation to the corporate
register and any common themes arising from
across service registers;
• At service level, service risk register reports
should be considered by Service Management
Teams quarterly to ensure continued relevance
to service activities, and be updated following
service planning activity;
• Service Register Reviews should also be
informed by any changes to the CRR to ensure
that any key corporate risks that may impact
the service are adequately considered and
reflected;
• New risks can and should be added at any
point where they are identified outwith the
formal review process;
• This approach ensures that the risk
management process is both ‘top down’ 
and ‘bottom up’
Page 362 of 454

Page 363

8
Risk Management Strategy 2026
4 Risk Registers
4.1  Risk Registers are a management tool used to
capture and maintain information on key areas
of uncertainty that relate to achievement of
objectives, in a consistent and comprehensive
format. The detail contained in a risk register,
including results of analysis and evaluation,
will enable Teams, Services and ultimately the
Corporate Management Team to compare
evaluations, and assess and understand the
organisation’s exposure to risk. Registers
will be used for the ongoing management of
uncertainty including capturing assessment
details, relevant controls and actions, and be
used to inform decision making.
4.2  Risk registers will be recorded and maintained
in the Council’s Risk Management Information
System. This system shall be configured
to reflect the organisational structure of the
Council, its Services and Teams. Visualisation
of this information will provide ease of analysis
and the production of Risk Management
information to aid decision making. The
detailed Risk Management guidance which
supports this Strategy contains documentation
to enable Teams to capture information on
uncertainties for this purpose.
4.3  Enterprise Risk Management means that
registers are maintained at each level of the
organisation, with the flexibility to escalate and
de-escalate risks between levels.
4.4  The levels are:
Risk Register Levels
Corporate Risk Register (CRR) Corporate risks are owned and overseen by the Corporate Management Team, and will be
monitored and reviewed by relevant Corporate Working Groups and/or Service Management
Teams on behalf of CMT. Progress on the management of these risks will be regularly reported
to the Corporate Management Team and the Audit & Scrutiny Panel as required. The Corporate
Register will be subject to ongoing review.
Service Risk Registers Service Risk registers will be maintained by each Service and will be considered at least once
every 3 months to ensure that they continue to reflect the risk profile of the service and that
matters are proposed for escalation where appropriate.
Service risk registers should be a reflection of Team registers, and include relevant partnership
and project risks. Detailed project risks and issues will be recorded within project management
documentation.
Project Risk Registers Project Risks should be captured and managed within project risk registers (within Project
Management documentation - not within the Risk Management Information System. We will
explore opportunities for centralising Project Risk Registers during the term of this Strategy) in
accordance with the Council’s Project Risk Management process which is embedded within
the Council’s approved Project Management Framework. The project risk management process
should be followed for all projects, as the risks that can hamper project success or cause
adverse impacts on the council, can happen in any project irrespective of the size or spend
of the project. Risks relating to the successful implementation of key projects of corporate
significance will be considered for inclusion within the CRR. Following project implementation
however, there may be residual operational risks which require to be included in the service risk
register of the relevant service
Page 363 of 454

Page 364

9
Risk Management Strategy 2026
5 Risk Management Governance,
Leadership and Accountabilities
Everyone in the Council has a role to play in managing risk and should be aware of their
responsibilities. The following clearly sets out the roles and responsibilities for all, split by
formalised groups and individuals.
5.1 Roles and responsibilities - Groups
Policy and Strategy Committee •   Approve the Risk Management Strategy and governance framework and ensure that there is an appropriate review cycle for the strategy;
•   Support management in the use of risk management as an integral part of business practice;
•   Consider periodic reports from the Audit and Scrutiny Panel on overall performance of the Council’s Risk Management and Governance arrangements.
Audit and Scrutiny Panel •   Review and provide independent assurance on the adequacy and effectiveness of the Council’s risk management framework;
•   Monitor the effective development and operation of risk management arrangements in the Council, including monitoring progress in addressing risk related
issues reported to the Panel.
Corporate Management Team (CMT) Managing the Risk Management Framework:
•   Provide high level commitment to supporting, promoting and encouraging good risk management practice throughout the organisation, including
appropriate training, and developing a culture that seeks to be risk aware;
•   Ensure that responsibility for risk management is assigned to an appropriate Chief Officer to oversee corporate risk management arrangements on behalf of
the Chief Executive;
•   Ensure that there is adequate risk management resource to support the organisation in delivering effective risk management;
•   Ensures that key strategic decisions are undertaken with an understanding of the risks and associated controls either already in place or planned;
•   Receive reports that enable monitoring of delivery of the Risk Management Strategy.
Page 364 of 454

Page 365

10
Risk Management Strategy 2026
5.1 Roles and responsibilities - Groups
Corporate Management Team (CMT) Managing Risk:
Own and oversee the CRR, which captures significant Key Corporate Risks;
• Ensure the identification, analysis, evaluation and ongoing management of Corporate Risks and that identification of these risks takes into consideration the
changing internal and external context in which the Council operates;
• Receive regular reports on how corporate risks are being managed;
• Ensure that an appropriate member of the CMT is identified as the owner of corporate risks;
• On an ongoing basis, monitor and review the CRR, including progress on planned control actions, and consider reports from the Risk Management
Corporate Working Group on risk management matters;
• Be proactive in identifying potential new and emerging uncertainty in relation to organisational objectives;
• Ensure that lessons are learnt from incidents, inspections, audits and self-assessments, and that these are considered and reflected where appropriate in
the Council’s risk registers.
Business Management Team (BMT) • To consider risk management outputs going to Committee and/or the Audit and Scrutiny Panel ensuring that adequate assurance exists on the effective
operation of the Council’s risk management arrangements.
Service Management Teams • To regularly review and monitor service risk registers, ensuring that registers are complete and up to date, that new and emerging risks are identified
assessed and managed effectively, and that service risk registers are used to support management discussions and inform decision-making.  
Specifically, this includes:
• Ensuring that risk management is integrated into service management arrangements including planning, performance management, project
management and change initiatives;
• Actively promoting risk awareness, ensuring that existing and emerging risks are understood and managed effectively within Services;
• Ensuring that appropriate Risk Management training is undertaken within each Service area;
• Ensuring that there is adequate resource to support risk management within each Service;
• Proactively identifying potential new and emerging uncertainty in relation to organisational objectives;
• Ensuring that lessons are learnt from incidents, inspections, audits and self-assessments, and that these are considered and reflected where
appropriate in risk registers; 
• Managing risks on a day-to-day basis, using Service and Project risk registers to monitor risks, plan services and support decision making, ensuring
appropriate actions are undertaken on a timely basis;
• Consider whether any high-level service risks may require escalation to the CRR.
Risk Management Corporate
Working Group (RMCWG)
• Support CMT in the co-ordination of activities and resources across the Council in order to implement the Risk Management Strategy and embed and
promote good risk management practice;
• Promote the integration of risk management into Service management arrangements including planning, performance management, project management
and change initiatives;
• On an ongoing basis, identify and review training requirements to ensure good risk management knowledge and awareness across the Council;
• Provide a forum for the sharing of good risk management practice, and share information in respect of existing, new and emerging risks; 
• Provide risk management support and advice across the organisation;
• Be the mechanism for movement of risks between Corporate and Service Risk Registers through Service Risk Champions and the Corporate Risk Team.
Page 365 of 454

Page 366

11
Risk Management Strategy 2026
5.1 Roles and responsibilities - Groups
Service Risk Forums • Support Service Management Teams in the co-ordination of activities and resources across the Service in order to implement the Risk Management
Strategy and embed and promote good risk management practice;
• Provide regular reports to Service Management Teams on the management of Service risks and more generally on progress in embedding risk
management arrangements within Services;
• Promote the integration of risk management into Service management arrangements including planning, performance management, project management
and change initiatives;
• On an ongoing basis, identify and review training requirements to ensure good risk management knowledge and awareness across the Service;
• Provide a forum for the sharing of good risk management practice, and share information in respect of existing, new and emerging risks; 
• Provide risk management support and advice across the Service;
• Be the mechanism for movement of risks between Teams/Services and the Corporate Risk Register.
Corporate Working Groups • On behalf of CMT, and in conjunction with Risk Leads, key Corporate Working Groups/Management Teams may be tasked with the assessment,
monitoring and oversight of those risks on the CRR which link to the work of that group;
• Review lessons learnt from any relevant incidents and losses, inspections, audits and self-assessments related to those risks, and reflect and consider the
Council’s management arrangements in respect of them.
5.2 Roles and responsibilities - Individuals
Elected Members Risk management is an important and integral part of the Council’s governance arrangements and is crucial to the achievement of outcomes. A significant
aspect of an Elected Member’s role is in making decisions for the Council and the people of North Lanarkshire. The CIPFA/SOLACE Guidance “Delivering
Good Governance in Local Government” makes explicit the decision-making role of Elected Members, and the need to ensure that risk information contributes
to the decision making process.
Elected Members need to be satisfied, when considering recommendations from officers, that risk has been considered and addressed as part of relevant
decision-making activities. Members also need to ensure that the Council’s Risk Management Strategy and policies are suitably aligned with and support the
delivery of objectives.
In discharging these responsibilities Elected Members will:
• Require Officers to develop and implement an effective framework for risk management, and to receive reports on the management of significant risks on a
regular basis;
• Expect Officers to ensure that committee reports describe significant risks associated with proposals, and detail how these risks will be managed;
• Ensure that risk management arrangements are evaluated and monitored on a regular basis.
Chief Executive Supported by the Chief Officer (Audit & Risk), the Chief Executive will:
• Have overall responsibility for the Council’s Risk Management framework;
• Champion risk management at senior level, ensuring that effective arrangements and resources are in place to manage risk;
• Be accountable for the management of risk within the Chief Executive’s Service;
• Nominate and support a Service Risk Champion, who will co-ordinate risk management activities within the Service;
• Promote risk management awareness and practice within their area of responsibility;
• Ensure that risk management is integrated into Service planning, performance management and project management arrangements, and is a regular item
on the agenda of the Chief Executive’s SMT meetings;
• Ensure risks are appropriately managed, monitored, reported, reviewed and escalated where necessary, and that appropriate action to manage risks is
undertaken on a timely basis by control and/or action owners.
Page 366 of 454

Page 367

12
Risk Management Strategy 2026
5.2 Roles and responsibilities - Individuals
Depute Chief Executive • Accountable for the management of risk within the Services which they oversee as part of their role as Depute Chief Executive;
• Nominate and support a Service Risk Champion(s), who will co-ordinate risk management activities within their Service(s);
• Promote risk management awareness and practice within their area of responsibility;
• Ensure that risk management is integrated into Service planning, performance management and project management arrangements, and is a regular item
on the agenda of management meetings;
• Ensure their risks are appropriately managed, monitored, reported, reviewed and escalated where necessary, and that appropriate action to manage risks
is undertaken on a timely basis by control and/or action owners.
Chief Officer (Audit & Risk) • Accountable to the Chief Executive, and has delegated responsibility for overseeing the Risk Management framework and the Council’s Risk Management
function;
• Provide regular reports to BMT/CMT and the Audit & Scrutiny Panel on the management of Corporate Risks and more generally on operational
performance and progress in embedding the Council’s risk management arrangements.
Corporate Risk Team (Corporate
Risk Manager and Corporate Risk
Officer)
• Co-ordination and continuous development of risk management arrangements across the organisation liaising with CMT and Services on their
implementation;
• Provide support and guidance to the organisation on the management of risk;
• Provide a range of risk management training opportunities to maintain role appropriate knowledge and awareness of risk management across the
organisation;
• Oversee the development, use and maintenance of the Risk Management Information System to support management of the Council’s risk registers;
• Support CMT in the ongoing management of the CRR;
• Monitor progress of Services in their implementation of the Risk Management Strategy;
• Support the Chief Officer (Audit & Risk) in meeting risk reporting requirements;
• Provide project risk management support where required for key projects including facilitation of risk workshops etc.
Chief Officers • Accountable for the management of risk within their area of responsibility;
• Responsible for identifying and analysing potential compliance risks for their service area including for example, Fraud risks, Health & Safety, Procurement
etc;
• Nominate and support a Risk Facilitator who will liaise with Service Risk Champions to co-ordinate risk management activity across their Teams;
• Ensure that employees are familiar, as appropriate, with the Risk Management Strategy, guidance and controls relevant to their specific duties;
• Ensure that training needs are assessed and met in respect of risk management skills.
Managers • Promote risk management awareness and practice within their area of responsibility;
• Ensure that risk management is integrated into Service planning, performance management and project management arrangements, and is a regular item
on the agenda of management meetings;
• Ensure their risks are appropriately managed, monitored, reported, reviewed and escalated where necessary, and that appropriate action to manage risks
is undertaken on a timely basis by control and/or action owners.
Risk Leads/Owners Those who through the risk management process are identified as having ownership of risks;
•   Responsible for leading on the ongoing management and monitoring of a particular risk assigned to them.
Control Owners Those who through the risk management process, are identified as having ownership of either current or planned controls;
•   Responsible for ensuring that controls are managed and maintained, and that any changes to controls are notified to risk owners so that risks may be
reviewed accordingly. 
Action Owners Those who through the risk management process, are identified as having ownership of those actions deemed necessary to either prevent or mitigate risks;
•   Responsible for ensuring that risk improvement actions assigned to them are progressed to satisfactory completion.Page 367 of 454

Page 368

13
Risk Management Strategy 2026
5.2 Roles and responsibilities - Individuals
Risk Champions Acting as the point of contact for risk management matters within their Service, the Risk Champion will be responsible for providing assurance to the Depute
Chief Executive / Chief Executive / Chief Officer on whether risk management arrangements are in place and operating effectively in accordance with the Risk
Management Strategy. This will be achieved by:
• Participating in the work of the Risk Management Corporate Working Group;
• Promoting risk awareness across their Service, including contributing to identification of relevant training needs and monitoring of the completion of the
same;
• Directing risk management discussions at Management Team meetings, ensuring that “Risk” remains a regular item on the agenda;
• Guiding, liaising with and supporting Risk Facilitators in Teams through the Service Risk Forum;
• Supporting their Service Management Team in the ongoing development and management of Service Risk Registers;
• Escalating risks to the Depute Chief Executive / Chief Executive / Chief Officer where immediate attention is required;
• Providing project risk management support where required for key projects including facilitation of risk workshops etc;
• Monitoring service compliance with the requirements of the Risk Management Strategy, process and procedures;
• Engaging in appropriate risk management training to maintain skills and knowledge.
Risk Facilitators Acting as the point of contact for risk matters within their Team, Risk Facilitators will be responsible for providing assurance to their Chief Officer on whether
risk management arrangements are in place and operating effectively in accordance with the Risk Management Strategy. This will be achieved by:
• Liaising with Risk Champions to maintain a co-ordinated approach including through the service risk forum;
• Promoting risk awareness across their service area, including contributing to identification of relevant training needs and monitoring completion of the
same; 
• Supporting their Management Teams in the ongoing development and management of Team Risk Registers;
• Directing risk management discussions at meetings, ensuring that “Risk” remains a regular item on the agenda;
• Escalating risk issues to the Chief Officer of the Service and Risk Champion where immediate attention is required;
• Engaging in appropriate risk management training to maintain skills and knowledge.
Project Managers/Project Boards
etc
Those involved in delivery of projects for the organisation have specific responsibilities for managing risks and issues within the Project Management
process, which could threaten delivery of the project, or compromise cost, quality or timescales. Key responsibilities are specifically laid down in the Project
Management framework.
Internal Audit Provide independent review, and report on adequacy of the Council’s risk management arrangements and the effectiveness of implementation of the Risk
Management Strategy at all levels.
Insurance & Risk Team • Put in place and maintain appropriate risk financing arrangements to mitigate against unacceptable financial loss from insured risks, in line with the
Council’s risk retention appetite;
• Handle in-house all liability and property damage claims within parameters agreed with the Council’s insurance/risk partners;
• Feedback to Services and the RMCWG statistics and loss information that will enable Services to target areas for improved risk control and loss prevention;
• Assist Services on control of insurable risks and the improvement of operational risk controls.
Employees • Maintain awareness of the Council’s Risk Management Strategy and processes through completing appropriate mandatory Risk Management training;
• Be aware of and contribute to the effective identification and management of risks relevant to their own role and that of their team. 
Page 368 of 454

Page 369

14
Risk Management Strategy 2026
6 The Three Lines Model
The Council operates on the principles of the ‘Three Lines’ model, an internationally
recognised framework for managing risk, which provides structure and helps demonstrate
key roles and responsibilities within that framework and how these link together to deliver
robust risk management.
6.1 Figure 1 below illustrates how responsibility
for managing risk gets proportionately less as
we move down the three lines, with the most
significant level of ownership and responsibility
for managing risks resting within the first line at
the top of the triangle, front line services.
• 1st Line lies with front line/operational
management who maintain ownership,
responsibility, and accountability for directly
identifying, assessing, controlling and
mitigating risks.
• 2nd Line includes those areas that provide the
tools and framework to allow the first line to
fulfil its role. Includes areas like the Corporate
Risk Team, Legal, Democratic & Strategy,
Finance & Technology, Health & Safety etc.
Second line functions facilitate and monitor the
implementation of effective risk management
by the first line, including providing key risk
controls, guidance, support, training and
advice.
• 3rd Line provides independent assurance
and includes areas that check activities and
arrangements at second and first lines to
ensure they are fit for purpose and are being
complied with. For example, the Internal
Audit function provides assurance to Audit
& Scrutiny Panel and senior management
about how well the first and second lines are
identifying and managing risks, and around
implementation and effectiveness of risk
controls.
Page 369 of 454

Page 370

15
Risk Management Strategy 2026
North Lanarkshire Council’s Three Lines Model
Services
Operational Procedures, Managing Risk,
Control Activity, Projects, Self-Evaluation
Oversight/Enabling/Control Functions
Corporate Risk Team, Legal, Democratic & Strategy,
Finance & Technology, Health & Safety etc (Framework,
Guide, Consult, Train, Advise, Support)
Assurance Providers
Internal Audit (Monitor Compliance, 
Provide Independent Challenge and Assurance)
3
2
1
3rd
Line
2nd Line
1st Line
Figure 1 - Three lines model
Page 370 of 454

Page 371

16
Risk Management Strategy 2026
7 Risk Management Structure
The following diagram shows the structure of risk
management activity in North Lanarkshire Council. 
Primary responsibility for co-ordination of risk
management activities lies with the Corporate Risk
Team through the Risk Management Corporate
Working Group. Service Risk Champions will be
responsible for facilitating and supporting the
implementation of risk management within their
service activities through their Service risk forums,
and reporting progress and risk management
information to their own Service Management
Teams.
Corporate
Management Team
Chief Officer
(Audit & Risk)
Corporate Risk Team
Service risk forums
(1/4ly following RMCWG)
Service
Management Teams
Policy and Strategy
Committee
RMCWG (8 weekly)
Service Committees
Audit and Scrutiny Panel
Risk Champions
Operational
Management
Employees
Figure 2 - Risk Management Structure
Page 371 of 454

Page 372

17
Risk Management Strategy 2026
8 Risk Management Methodology
Scope, Context,
Criteria
Com
m
unication
and
Consultation
Risk Evaluation
Risk Analysis
Risk Identification
Risk Assessment
Risk Treatment
M
onitoring
and
Review
Recording and Reporting
Figure 3 - Risk Management Process
8.1  Effective Risk Management is about developing
the right culture, processes and structures
in our organisation and directing them in a
co-ordinated way to manage risk, facilitate
continuous improvement and enhance service
delivery.
8.2  Risk Management is about being proactive in
understanding uncertainties that can impact
on achievement of our goals. It is a continually
evolving process which helps us to learn
and build upon good practice, ensuring that
we manage uncertainty in a proactive way,
contributing to successful delivery of services
and Corporate Priorities.
8.3  Embedding Risk Management throughout
the organisation will be achieved by the
consistent application of the risk management
process shown in Figure 3, across all Services
and business activities. This will enable the
organisation to manage and monitor risks at
the most appropriate level, ensuring that the
right oversight is in place, and that we respond
to risk in a consistent and proportionate
manner.
8.4  Risk management should not be done in
isolation, but requires to be considered by
Services, Teams, Programme and Project
Teams as a routine part of Corporate, Service,
Operational, Programme and Project planning.
This means that assessing risk becomes an
integral part of our working practices as well as
a feature of how we approach development of
new policies or business change initiatives.
8.5 A methodology for managing risk across
the organisation has been established and
will be consistently applied at all levels. The
approach has been developed in accordance
with the International Risk Management
Standard ISO31000:2018 “Risk Management –
Guidelines” as illustrated in Figure 3. 
Full details of the Risk Management
methodology to be followed are contained
in the Risk Management guidance that
accompanies this strategy.
Page 372 of 454

Page 373

18
Risk Management Strategy 2026
9 Risk Reporting, Review & Challenge
9.1  Different levels of the organisation require
different information from the Risk
Management process. For example, CMT
should know about the most significant
Corporate Risks facing the Council and how
these risks are being managed. Service
Management Teams require to be aware of the
risks which fall into their area of responsibility
which may impact on the services provided
by them, and on their ability to achieve their
objectives. Teams need to be aware of and
take appropriate action on the risks that face
the Team.
9.2  Risks identified and their control status should
be formally reported to the appropriate level
of management and stakeholders on a regular
and timely basis to ensure that they receive the
appropriate level of management attention.
9.3  To allow for the effective monitoring of risks, a
Risk Owner should be identified for each risk. 
This person is responsible for ensuring that
plans are in place for reviewing and reporting
progress on the management of that risk and
associated actions. The Risk Owner will be a
named individual.
9.4  The CRR will be presented to the Audit and
Scrutiny Panel on a quarterly basis. This will
reflect exceptional changes to the register that
occur in the reporting period. For example,
new additions, deletion or changes to the
assessment.
9.5 Risk Management reports will also be
presented to Service Management Teams on
a quarterly basis to enable them to monitor
and review key service risks, as well as
have oversight of service risk management
arrangements.
9.6  Oversight of risk registers is an essential part of
the risk management process, to ensure that
registers reflect the organisation’s risk profile.  
It will identify any anomalies for example where
risk or control review is due. Having the correct
oversight and challenge will mean that we
maximise the benefit of the risk register as
a management tool and have accurate risk
management information to inform decision
making.
9.7  As part of risk register monitoring,
management should consider the effectiveness
of risk controls and actions and how these
are reflected in risk ratings. Management
should also consider any new risks which have
emerged and reflect on any risks closed in the
reporting period.
9.8  Where a risk is reviewed by the Service and
felt to have either corporate relevance or its
significance has escalated to be of corporate
interest, this should be raised through the Risk
Management Corporate Working Group or with
the Business Management Team for inclusion
as a Corporate Risk.
9.9  The Council’s Internal Audit Team will
undertake regular audits of the Council’s
risk management arrangements as part of
the annual Internal Audit plan. The Council’s
external auditors may also periodically review
the risk management processes put in place
by the Council as part of their review of
the Council’s wider corporate governance
arrangements.
Page 373 of 454

Page 374

19
Risk Management Strategy 2026
Risk Management Monitoring
9.10 Risk Management activity across services will
be monitored through the RMCWG in order to
provide targeted support to enable services
to maximise the benefit of risk management
as a management tool.  An agreed monitoring
approach will be used by the corporate
risk team and members of the risk network
on a 6 monthly basis to identify areas for
improvement.  A summary of the results will
be utilised to provide high level management
information and inform reporting to SMTs,
BMT, CMT and Audit & Scrutiny Panel.
Risk Tolerance
9.11 North Lanarkshire Council seeks to be risk
aware not risk averse, which means that we
will accept a tolerable level of risk that provides
a balanced organisational risk profile. The
expected responses to the varying levels of
risk are detailed in the accompanying risk
guidance.
It is recognised that in certain circumstances
there will be certain risks which the council
has little direct control or influence or where
incidents or errors may occur despite robust
controls being in place. In such circumstances
the risk management process should ensure
appropriate governance and oversight of these
risks through frequent monitoring and review of
the risk and control arrangements, to provide
assurance over the management of these high
risks.
More detail surrounding risk tolerance and
expected responses is contained within
the Risk Management Guidance which
accompanies this strategy.
9.12 Risk appetite is an expression of how much
uncertainty an organisation is willing to invite
into its processes in pursuit of objectives.
Having an established risk appetite framework
can encourage consistency when making risk
informed decisions. North Lanarkshire Council
will seek to develop its approach to risk
appetite throughout the period of this Strategy.
Page 374 of 454

Page 375

20
Risk Management Strategy 2026
10 Training and Development
10.1  We need our workforce to have an awareness
of Enterprise Risk Management. We will ensure
that colleagues with a more detailed role in
facilitating the risk management process have
the skills and competence appropriate to their
role.
10.2  The Risk Management Corporate Working
Group will continuously identify and review
risk management training needs across the
organisation. The Corporate Risk Team will
provide training and learning opportunities
for Elected Members and Officers, which are
appropriate and proportionate to roles and
responsibilities.
10.3  Risk Management Training and Awareness
materials are referenced within the Risk
Management guidance which accompanies
this strategy. This may range from those
who require a general awareness, to Elected
Members and Senior Managers with more
strategic decision-making responsibilities, and
those employees who have a more specific
role in the Risk Management process.
Page 375 of 454

Page 376

21
Risk Management Strategy 2026
11 Key Initiatives for Development in 2026-2029
Figure 4
Ever Present Risk
11.1  It is recognised that there are some Corporate
Risks that due to their ever present nature,
will always command the attention of Senior
Management. Where captured on risk registers
these ubiquitous risks tend to be static in
terms of assessment and have a series of
implemented controls; controls which are in
the main managed by second line functions
and must have cross organisational awareness
and adherence in order to remain effective.
The key aspects of the control environment
of these risks often feature in Internal Audit
assignments. Throughout the term of this
Strategy, we will explore the development of a
method of recording and treating these risks
which has a focus on developing enhanced
assurance in relation to the control environment
of these risks and for ongoing management
awareness and continuous improvement.
Opportunity Management
11.2  Recognised best practice and publications
promote the practice of capturing opportunities
within risk registers. Opportunities are areas
of uncertainty that could have a positive
impact on the achievement of objectives.
When opportunities are formally captured and
managed within risk registers, it can support
informed decision making on whether, and
how, to maximise their potential benefits. We
will develop our risk register infrastructure to
record opportunities alongside risks.
Risk Appetite
11.3  In preparing this iteration of our strategy
we have recorded explicit reference to the
definitions of risk tolerance and risk appetite
in line with industry standard. During the
term of this strategy we will explore emerging
methodologies and develop our application
of risk appetite to enhance our overall risk
management arrangements.
The timelines for delivering these initiatives are
illustrated in Figure 4.
Page 376 of 454

Page 377

22
Risk Management Strategy 2026
12 Risk Management Guidance
Page
A. Risk Management Methodology and processes  23 - 24
•   Establishing the Context
•   Risk Assessment:
•   Risk Identification and description
•   Risk analysis
•   Risk evaluation
•   Risk response
B. Risk Assessment – Matrix & Descriptors     25 - 28
•   Likelihood descriptors
•   Impact descriptors
•   Risk Scoring Matrix
•   Risk Response and Escalation
•   Monitoring and Review
C. Risk Capture and Review Instructions      29 - 33
D. Risk Management Reporting        34
E. Dealing with Risk in Committee Reports     35 - 36
F. Training & Awareness Materials       37
G. Glossary of Risk Management Terms      38 - 39
Page 377 of 454

Page 378

23
Risk Management Strategy 2026
Risk Management Methodology
The process adopted by the Council for managing
risk is summarised below. 
Step 1. Establish the Context
The first step in the risk management process is
to understand and define the planned objectives,
outcomes and targets of the Service, Team or
Project. This will include scope, stakeholders, the
environment in which we operate, and any internal
and external factors. This is important since the
context from a corporate or strategic perspective
may be very different from an operational
perspective.
Step 2. Risk Assessment
This is the process where we identify key risks and
consider the likelihood and impact of these on
achievement of objectives, outcomes and targets. 
Risk assessment comprises the following three key
elements:
• Risk Identification
• Risk Analysis
• Risk Evaluation
Scope, Context,
Criteria
Communication and Consultation
Risk Evaluation
Risk Analysis
Risk Identification
Risk Assessment
Risk Treatment
M
onitoring and Review
Recording and Reporting
Figure 5 - Risk Management Process
Risk Identification
This is the systematic use of information from
the “Establishing the context” stage to identify
and describe risks. When identifying risks, there
are 6 risk categories that should be considered:
Strategic, Financial, Operational, Human Resources,
Legislative & Regulatory and Information Technology.
Detailed information on each risk category, including
their subcategories, can be found later in this
guidance document.
The risk identification process should, where
possible, involve relevant subject matter experts
who have knowledge or experience of the activity
or matter under consideration.  Risks should be
described in three parts, covering:
• The risk event i.e. “there is a risk
that…………..”
• The cause i.e. “due to……..”
• The consequence i.e., “which could result in
……”
Each risk should be considered in the context of,
and aligned to the Council’s corporate priorities, and
those activities that contribute to their achievement.
To ensure appropriate ownership of risk, each risk
should be assigned to a “Risk Owner”. This is the
person who, through the risk management process,
is identified as being the most appropriate Officer
to lead on the management and oversight of a
particular risk.
Page 378 of 454

Page 379

24
Risk Management Strategy 2026
Risk Analysis
This stage determines the significance of a risk and
its priority relative to others through risk analysis.
We estimate the risk’s likelihood and multiply it by
its potential impact using the Council’s Likelihood
and Impact Descriptors and Risk Matrix. These tools
ensure a consistent approach to risk measurement
across the organisation. The combined score
produces a risk rating, calculated in two stages:
• Inherent risk rating is calculated first and is
done as if there were no controls in place to
manage the risk.   
• Existing controls – we then need to consider
what controls are already in place to manage
the risk. Controls can be policies, procedures,
training or other management arrangements
designed to manage risk by either reducing the
likelihood of the risk occurring, and/or reducing
the impact if it does occur.
• Residual risk rating is then calculated after
consideration of the effectiveness of existing
controls.
The residual risk rating will then dictate whether
further actions are required to reduce the risk further.
This analysis of risk produces a risk rating as
follows:
Risk Ratings
Insignificant Low Medium High Very High
Risk Evaluation
Compares the scores of all of the analysed risks
in order to make decisions about their significance
in relation to our priorities, objectives, and targets. 
This produces a “Risk Profile” which enables us to
prioritise the risks and decide whether further action
is required, with higher rated risks being given more
focus.
Risk Response/Treatment
Involves responding to identified and evaluated risks
in a way that is proportionate to the level of risk. This
means identifying what, if any, additional actions
and controls are required to manage the risk further.
Risks may be responded to by means of the 4 “T” s:
• Terminate – Avoid or eliminate the risk
exposure or activity giving rise to the risk, then
it no longer presents a risk to manage.
• Treat – implement cost effective actions to
modify the risk to a more tolerable level.
• Transfer – transfer all or part of the risk to
a third party i.e. through contract terms,
insurance etc.
• Tolerate – an informed decision to accept the
likelihood and the impact of a particular risk
rather than trying to mitigate it further.
This guidance applies to our current process for
identifying and managing threats. While threats
remain a key focus, it is equally important to
consider opportunities when assessing uncertainty
and its potential impact on our objectives.
During this strategy period, we are committed to
enhancing our approach to include the identification
and management of opportunities. Additional
guidance will be provided as this evolves.
If you identify an opportunity and require support,
please contact the Corporate Risk Team, who can
provide tools and assistance to help you develop
and manage opportunity related risks effectively.
Page 379 of 454

Page 380

25
Risk Management Strategy 2026
Risk Assessment
Likelihood Descriptors
Please note that descriptors are intended to be
indicative only and may need to be tailored to
the individual objective, project or activity under
consideration, for example in line with specific
professional guidance, national targets or project
parameters. These should be agreed with all
stakeholders concerned with the risk.
Likelihood Descriptors
Score Description
5
Almost Certain
Event expected to occur
(If occurring treat as an issue)
Over 90% likelihood of occurrence
4
Likely
Event will probably occur
61-90% likelihood of occurrence
3
Possible
Event could occur
31-60% likelihood of occurrence
2
Unlikely
Event not expected to occur
11-30% likelihood of occurrence
1
Rare
Remote chance event could occur in certain
circumstances
10% or less likelihood of occurrence
Page 380 of 454

Page 381

26
Risk Management Strategy 2026
Impact Descriptors
Description of impact
Score On Service Delivery Financial On people (including
physical and mental
wellbeing)
On reputation Inspection / Legal / Compliance
5
Catastrophic
Catastrophic failure in service quality
and key service standards are not met;
long term catastrophic interruption to
operations; several major partnerships
are affected
Severe financial loss
>£1million
Multiple deaths
Major permanent incapacity
Prolonged National and
Local condemnation
National media(> 3 days)
Rapid intervention and/or prolonged
attention from legislative/regulatory body
Serious breach including potential
prosecution
Severely critical report
4
Major
Major impact to service delivery; multiple
service standards not met; long term
disruption to operations; multiple
partnerships affected
Major financial loss 
£500,000 - £1m
Death
Major injuries or long-
term incapacity/ disability
(loss of limb), requiring
medical treatment and/or
counselling.
Serious negative national or
local criticism
National media (<3 days)
Local media >3 days
Medium-term attention from legislative/
regulatory body
Breach which could lead to litigation or
prohibitions
Enforcement Action / Critical report
3
Moderate
Significant failure of service quality; major
partnership relationships strained; serious
disruption to service standards
Significant financial loss
£250,000 - £500,000
Significant injury requiring
medical treatment and/or
counselling.
Some adverse public / local
media attention
Local media only <3 days
Short term attention from legislative/
regulatory body
Breach which could lead to claims or
inquiry
Challenging recommendations but can
be addressed with appropriate action
plan.
2
Minor
Minor impact on service quality/minor
service standards are not met; short term
impact
Moderate financial loss
£50,000 - £250,000
Minor injury or illness, first-
aid treatment needed. No
staff absence required.
Minor adverse local/
public/media attention and
complaints
Very minor attention from legislative/
regulatory body
Legal action is unlikely or only minor
claims
Minor recommendations made which
can be addressed by low level of
management action
1
Insignificant
No impact on service quality/limited
disruption to operations
Minimal loss <£50,000 Adverse event leading to
minor injury not requiring
first aid.
No interest to the media,
internal only.
Public concern restricted to
local complaints
No external interest
None or little risk of legal action
Small number of recommendations
which focus on minor quality
improvement issues.
Page 381 of 454

Page 382

27
Risk Management Strategy 2026
Risk Scoring Matrix 
Risk Scoring Matrix
Risk
Likelihood
Almost Certain
5 5 10 15 20 25
Likely
4 4 8 12 16 20
Possible
3 3 6 9 12 15
Unlikely
2 2 4 6 8 10
Rare
1 1 2 3 4 5
1
Insignificant
2
Minor
3
Moderate
4
Major
5
Catastrophic
Risk Impact
Risk Rating Insignificant Low Medium High Very High
Risk Scoring Matrix
Risk Rating Expected Response Escalation Guidance
Insignificant
1 - 3
Insignificant risks score from 1-3 on the risk matrix.  We can normally accept these. No
further actions would normally be expected to prevent or mitigate the risk.
No escalation required to service management team or BMT.
Low
4 - 8
Low risks score from 4 – 8 on the risk matrix. We can normally accept these. We wouldn’t
normally need or expect to do anything further to prevent or mitigate the risk other than to
actively monitor existing controls to ensure they continue to be effective.
No escalation required to service management team or BMT.
Medium
9 - 15
Medium risks score from 9 – 15 on the risk matrix. These can be tolerated if we are
confident about the arrangements/controls we have in place to manage them. Any
additional control measures identified as necessary should be cost effective in relation to
the risk.
These risks should be reviewed on a frequent basis by line management and progress
should be reported regularly to the Service Management Team
16 - 20
High
High risks score from 16 – 20 on the risk matrix. We can tolerate high risks, but we
do need to monitor relevant controls carefully.  Consideration should be given to any
additional control measures which could help prevent or mitigate the risk and reduce the
risk score, where such actions would be cost effective.
These risks should be reviewed on an ongoing basis by the relevant Service Management
Team who may report or escalate to BMT for consideration/inclusion in the CRR.
Very High
25
Very High risks score 25 on the risk matrix. These risks should be actively managed to
reduce the risk score. Consideration should be given to any additional control measures
which could help prevent or mitigate the risk and reduce the risk score, where such
actions would be cost effective.
These risks should be reviewed on a more regular basis by the relevant Service
Management Team who may report or escalate to BMT for consideration/inclusion in the
CRR.
Page 382 of 454

Page 383

28
Risk Management Strategy 2026
Monitoring and Review
Residual Risk
Score
Risk Rating Review
Frequency
25 Very High Monthly
16 – 20 High 3 monthly
9 - 15 Medium 6 monthly
4 - 8 Low 9 monthly
1 - 3 Insignificant Annually
Monitoring & Review
Once risks have been assessed and rated, they
should be on a programme of regular review
according to residual risk score as follows, unless
circumstances change to suggest the risk should be
reviewed sooner:
Page 383 of 454

Page 384

29
Risk Management Strategy 2026
Risk Capture Instructions
Mandatory fields are marked with an asterix
Risk Status*    Choose from Draft / Live / Closed
Primary Risk Category and Sub
Category* (see pages 40-41)
Chose most relevant Primary and Sub Category form drop down
Risk Title*        A short title/description of the risk.
Context* Some background information on the risk
Risk*                 Free text to describe what the risk or adverse event is. 
Wording should be “There is a risk that……“. A risk is something which “could” happen. If it happens or is definitely going to happen it becomes an “issue”.
Due to*               Free text to describe the potential causes of the risk occurring. Wording should be “due to….”
Impact**             Free text to describe the potential impact (s) if the risk occurs. Should be worded “which will result in……”
Proximity The earliest that this risk could occur: Immediate to one week; One week to one month; One month to six months; Six months to 1 year; One year to five
years; Greater than 5 years
Risk Owner*    The person who has responsibility for co-ordinating the management of the risk.
First Assessment Date The First Assessment Date needs to be in the past. The system will calculate when the next assessment date is due by frequency in Assessment Tab.
Risk Contact  This is a person nominated by the Risk Owner as first point of contact for any query regarding the risk. This person will also receive notifications on the risk,
new risk, assessment due or overdue in addition to Risk Owner
Corporate Priorities Tick any that are appropriate/most appropriate in relation to the risk. Should have at least one and may have all if considered relevant
Assessment
Inherent Likelihood*  Each risk should be scored in terms of Inherent Likelihood using the matrix below for guidance. Inherent Likelihood score is the evaluation of the likelihood of
the risk occurring if there were no controls in place. Enter the score from the drop-down menu.
Inherent Impact*  Each risk should be scored in term of Inherent Impact using the matrix below for guidance. Inherent Impact score is the evaluation of the potential impact if
the risk occurs, if there were no controls were in place. Enter the score from the drop-down menu.
Reason for Inherent Risk Likelihood*  Free text to describe the rationale for the Inherent Likelihood score. Where possible include any factual information to support this rationale.
Reason for Inherent Risk Impact*    Free text to describe the rationale for the Inherent Impact score. Where possible include any factual information to support this rationale.
Residual Likelihood*  Residual Likelihood score is the evaluation of the likelihood of the risk occurring, taking into account the control measures you have identified
Residual Impact*  Residual Impact score is the evaluation of the potential impact if the risk occurs, taking into account the control measures you have identified
Reason for Residual Likelihood*    Same rational as per Reason for Inherent Risk Likelihood
Reason for Residual Impact*  Same rational as per Reason for Inherent Risk Impact
Risk capture and assessment instructions
The following instructions define the process for recording risk details within the Risk Management
Information System. Supplementary tools and templates designed to facilitate risk identification,
documentation, and assessment are maintained by the Corporate Risk Management team and made
available to the risk network
Page 384 of 454

Page 385

30
Risk Management Strategy 2026
Risk Capture Instructions
Risk Response Type*  Terminate - Stop the activity giving rise to the risk or choose an alternative solution. This response may be chosen where the residual risk is too high, and the
preferred option is terminate.  
Treat - Implement cost effective measures to control a risk to a more acceptable level. Controls will focus on reducing either the likelihood of the risk
occurring, and/or the impact of the risk if it does occur. Chose Treat if there are any action plans.
Transfer - Transfer all or part of a risk to a third party, usually achieved through contract terms, insurance, or other means. 
Tolerate - Agree that any further action to treat a risk is not cost effective or proportionate in relation to the current risk and decide to tolerate it as it is.
Latest Review Remarks Free text to include a concise summary of any changes that have been made to a risk during a review.
Current Key Controls
Control Status*   Choose from Planned, In Progress, Implemented or Enhancing. Enhancing is where there is already a control and it will be further improved. 
Control Type*   Prevention where reduces likelihood of risk happening or Mitigation which reduces impact should the risk occur.
Key Control    If considered a most vital control
Control Description*  Something that reduces the likelihood of the risk occurring and/or mitigate the impacts if it does. 
Implementation Target Date Date that control was implemented. This is not mandatory
Control Owner*   In council terms while control owner can be a working group committee etc. for capture in Figtree it must be an individual. If it is a group etc. make reference
to that effect in the control description and enter as control owner person considered most suitable to co-ordinate the control. Where possible control owner
should be a NLC member of staff though there are certain time when control owner will be part of a key partnership e.g. NHS. Do not enter an elected
member as a control owner. 
Control Progress Remarks For controls that are not yet fully implemented, free text to document progress on a control during a risk review, including details of updates, improvements,
and changes made in developing the control.
Next Review Date (Implemented
Controls)
For implemented controls a field that fields allow users to set a date for the control to be next reviewed.
Latest Review Remarks
(Implemented Controls)
For implemented controls, free text to capture brief review notes at each review date. This ensures controls are still relevant and effective as prevention or
mitigation measures
Actions: Each Action must be linked to a parent control and the control status selected must NOT be’ Implemented’
Actions
Action Status*                                                    Choose from Raised, Underway or Complete
Action  Priority*                                                 Choose from Low Medium or High
Key Action If considered a most vital action
Action Description*                                          Details of the action which improve the control
Action Owner*                                                  Same rational as for control owner
Additional Contact This person will 
receive notifications on a new action, action due or overdue in addition to Action Owner
Action Progress Remarks Free text to document progress of an action during a risk review.
Page 385 of 454

Page 386

31
Risk Management Strategy 2026
Risk Categories
Primary Risk Category Sub Risk Category Definition
Strategic Managing Strategic Change Inability of the Council to implement change and reform while still delivering its corporate objectives
Digital and IT Strategy Technology is inadequate to support future council initiatives
Governance Leadership and Decision Making Ineffective leadership in agreeing a shared ambition and strategy for North Lanarkshire. Lack of clarity in defining
responsibilities and appropriate governance across the complex roles for all Elected Members and senior staff.
Health and Social Care Integration IJB is ineffective with knock on impact on the Council SW or that NLC cannot provide adequate support for IJB priorities
Financial Policies and Controls Inadequate financial control over council activities including partnership arrangements
Financial Sustainability Lack of funding to manage council activities in current and future years.
Capital and revenue grant funded programmes   Inability of NLC to deliver on a major capital or revenue programme/project where there is potential for grant clawback.
Operational Procurement Risk Failures in the procurement process designed for the purchase and ongoing management of goods, services, and works.
Engagement and Consultation with
Communities, Partners and Stakeholders
That communities, partners and stakeholders are not engaged in the shaping and delivery of services and that NLC does
not optimise the benefits from implementation of the Community Empowerment (Scotland) Act 2015
ALEO Risk ALEOs fail to deliver Council services, expectations or requirements
Project Risk Risk arising from inadequate project management.
Risk Management Risks arising from inadequate Risk Management
Serious Organised Crime, Fraud and
Corruption
Fraud against the council, employees, members, key partners or stakeholders. Relationships with inappropriate bodies,
groups of people/individuals. Corrupt practices across range of NLC Stakeholders. 
Terrorism NLC fails to plan, prepare and protect its employees, elected members, the public and our communities. NLC fails to
provide a co-ordinated approach and contribution to the Counter Terrorism initiatives led by Police Scotland.
Communications Non-compliance with Communications Strategy and Policies across the council. Communications are ineffective, do not
reach or are not received from relevant parties
Human Resources Human Resources Lack of suitable numbers of appropriately skilled staff. Non-compliance with employment legislation and regulation.
Legislative and
Regulatory
Non-compliance existing and new Legislation
and Regulation
Non-compliance with Legislation, Regulation and government policies.
Health and Safety Failure to comply with the Health & Safety at Work etc Act 1974 and associated legislation protecting the health, safety
and welfare of our employees and anyone else who can be affected by our activities.
Resilience Planning Inadequate response and participation in a Civil Contingency event
Business Continuity Planning Service delivery or business operations are interrupted
Information Security and Information
Governance
Information is not managed securely or that information governance is ineffective.
External Inspections External Inspections adverse findings including Best Value.
Public Protection Non-compliance with legal obligations/failure to provide adequate Public Protection arrangements
Climate Change (mitigation, adaptation and
sustainability)
Failure to develop and implement measures to create and contribute to having a sustainable environment across North
Lanarkshire. This includes all activities in addition to those covered by specific climate change legislation.
Tackling Poverty Poverty issues impacting on the lives and outcomes for people who live in North Lanarkshire.
Information Technology ICT Operational Capability IT solutions do not support the Council
Catastrophic Event Natural / Manmade Disaster Risks arising from a significant prolonged catastrophic event that impacts citizens, staff and service delivery.Page 386 of 454

Page 387

32
Risk Management Strategy 2026
Risk Review Instructions
Why
To ensure that we have thoroughly assessed and understand the risks which have been identified as significant enough to merit inclusion on the Risk Register, and to gain assurance on how
well or otherwise each risk is being managed. Regular reviews of each risk will allow management to understand progress with key actions, any change in risk ratings and the reasons why. 
Reviews will also assist in understanding how the risk could impact the achievement of objectives and provide managers with relevant risk information to aid informed decision making.  It is also
an opportunity to challenge whether the risk remains valid or whether it may be a candidate for closing.
Who
Critical to the process is ensuring that there is appropriate variety and breadth of stakeholder/subject matter expert input to develop information for each risk. This ensures that a balanced,
robust and well-informed view of the risk and its assessment is obtained, and ensures a common understanding of the risk and associated controls and actions amongst staff.
Risk reviews should be undertaken as part of team meetings (either scheduled or specially called for this purpose) or as part of working group meetings. If this is not possible or appropriate, the
review may be conducted remotely gathering input from relevant stakeholders/subject matter experts who are best placed to inform the update to the risk information.
When
Residual Risk Score Risk Rating Review Frequency
25 Very High Monthly
16 – 20 High 3 monthly
9 - 15 Medium 6 monthly
4 - 8 Low 9 monthly
1 - 3 Insignificant Annually
Step
1
Review risk context and wording
Take the opportunity to consider whether the risk itself is still valid, or whether there has been any change in context of the risk or whether the risk requires to be reframed/reworded to be more
relevant.  For example has the risk changed as the result of a change in how the service is delivered, or as a result of a change in the external environment in which we operate.
Step
2
Review Current Key Management Controls
Current risk management controls are those which are designed to mitigate the risk by either reducing the likelihood of occurrence or mitigating the impact of the risk if it does occur. These
should be controls that you know are already in place and are working effectively. Whilst difficult to judge with precision, key controls are those which are significant enough to mitigate the risk
from its inherent level to its current residual level.
By reviewing what is already in place for the risk, you are seeking to confirm:
• Whether the detailed controls are still in place and have the same ownership, confirm with the control owner;
• If they are still in place, can we regard them as still being effective in reducing likelihood or impact;
• If any controls have been removed, this should be detailed and reflected within the risk score and rationale.
• Consider whether there are any controls which you know to be in place which are not currently detailed;
Page 387 of 454

Page 388

33
Risk Management Strategy 2026
Risk Review Instructions
Step
3
Review Planned Management actions
If the residual risk score is too high and deemed unacceptable, it is necessary to agree the appropriate risk response. If it is agreed that the best response is to treat the risk further, then this
section is used to record planned management actions. These are the future actions deemed necessary to bring the risk down from its current “Residual” rating.  If an action is not likely to
contribute to having this effect, then it may not be necessary to include it so that attention can be focussed on the most important controls.
Avoid recording an action that is deemed to be “ongoing” since this is most likely just the same as maintenance of an existing control. Actions should have a target date for completion.
If the list of actions will not in themselves bring the risk down to an acceptable level, then this should be identified, with a clear statement of what future work will be done to identify actions
required.
Conversely, if there are no actions which will reduce the risk further, this should be noted with explanation.
If it has been decided to tolerate the risk at its current residual rating and take no further action, this must also be documented with accompanying rationale.
By reviewing planned management actions you are seeking to confirm:
• Which planned actions have been completed;
• If yes, whether any of these actions now constitutes a new management control which improves the control framework for the risk;
• If yes, the new control should be added to the controls information in Figtree and assigned a control owner;
• If no, record how completion of the action has enhanced or affected an existing control.
• If there are any new actions required, and whether any existing actions require to have new target dates.
• Ensure the action owner is the correct person and that they have a clear understanding of what their action is and timescales.
• Actions should always be linked to a parent control. 
• Consider whether there are any actions that are no longer relevant and should be removed.  (Notify corporate risk team for deletion on Figtree)
Step
4
Risk Assessment stage
In the context of changes made in previous steps, review the overall position to
• Evaluate whether the current inherent risk score remains valid or requires adjustment, considering that internal or external changes may influence the risk’s context and its inherent rating.
• Assess whether the current residual risk score remains accurate or requires adjustment, noting that the risk score could move either up or down depending on the impact of the risk review.
• Ensure “Rationale” is updated to reflect why particular risk scores have been chosen.
• Take time to make sure everything looks correct:
• Is there anything that is not as expected e.g. a residual Risk Rating greater than Inherent Risk Rating
• Is review frequency aligned to the risk rating in accordance with strategy as noted above.
Step
5
Review the remaining sections of the risk information for completeness, ensuring they are complete, relevant and current, noting any reasons for blank sections. Pay particular attention to any
changes in “Risk Context”, relevant to this risk. Bear in mind any potential impact on likelihood and impact scores.
Page 388 of 454

Page 389

34
Risk Management Strategy 2026
Risk Management Reporting
Report title Purpose of report Report
prepared by
Frequency of
report
Reported to
Policy &
Strategy
Committee
Business /
Corporate
Management
Team
Audit &
Scrutiny
Panel
Service
Senior
Management
Teams
Service
Committees
Risk Management -
Corporate Progress
report
Review and monitoring report to provide updates
on key corporate risk management developments,
summary of CRR and any key changes to that during
the period arising from Horizon Scanning activity. 
* Every second report will include a summary of the risk
profile across Service Risk Registers
Corporate
Risk Team
Quarterly
(BMT prior to
ASP)
 
Risk Management
– Service Progress
report
Review and monitoring of service risk management
implementation and summary of service risk register
together with key changes in the period.
* (Including reflection of changes to CRR that occur in
the reporting period)
Service Risk
Champion
liaising with
Service risk
forum
Quarterly
 
Risk Management
year- end report
To report on key activities and achievements in relation
to delivery of the Risk Management Strategy.
* Included in the Chief Officer Audit & Risk Annual
Report.
Corporate
Risk Team
Annual
 
Review of the Risk
Management Strategy
To seek approval for updates made to the Strategy Corporate
Risk Team
Triennially
following each
review of the
Strategy  
Throughout this strategy period, we are committed to enhancing our reporting arrangements by
incorporating visualisations and graphics. These improvements aim to better meet the needs of report
users, support dynamic risk analysis and informed decision making.
Page 389 of 454

Page 390

35
Risk Management Strategy 2026
Guidance for dealing with risk in Committee reports
How is Risk Management
incorporated into the Council’s
decision-making process?
The principles of risk management relating to
decision-making are the same as for any other risk
management process. The table below outlines the
process.
1. Identify any risks associated with the decision
and the implementation of the decision.
2. Assess the impact of the risk and the
likelihood of it occurring.
3. Prioritise and include commentary on any
significant risks/risks with significant potential
impacts in the report.
4. Manage – produce a SMART action plan
setting out how the Council intends to
minimise the impact or reduce the likelihood of
each of the significant risks identified.
5. Review risks with key subject matter experts
and relevant statutory officers and amend the
risk assessment accordingly.
6. Agree risk assessment with decision-maker
clarifying any risks in the risk assessment in
order to allow the decision to be made.
7. Update any Service or project risk registers
following the decision.
Committee report templates include a section ‘Risk
Impacts’. The section requires the author to record
significant risks identified after carrying out a risk
assessment. The risk assessment must record the
risks related to the proposed recommendations(s)
(including the risks of implementation) and the risks
of not taking the recommended action.
What is the purpose of the risk
assessment?
The risk assessment:
• Demonstrates that all significant risks related to
the decision have been considered;
• Provides evidence that the decision-maker has
been provided with sufficient information about
risks in terms of likelihood and impact; and
• Explains how risks will be managed.
What will the risk assessment
record?
The risk assessment should record:
• Risks that may arise if the decision is not
taken;
• Risks that may arise if the decision is taken;
and
• Action that will be taken to manage each risk
documented if the decision is taken.
Who needs to be involved in
compiling the risk assessment?
The report author will take the lead in compiling the
risk assessment using a standard template available
via the intranet. Involvement will vary significantly
depending on the subject matter and the nature of
the decision being sought but may include Subject
matter experts, the relevant Chief Officer, the
Chief Executive, the Council’s S95 officer and the
Monitoring Officer. The report author in consultation
with the appropriate Chief Officer should review the
report and the risk assessment prior to the report
being issued.
Page 390 of 454

Page 391

36
Risk Management Strategy 2026
Do all risks in relation to a proposal
have to be recorded in a risk
assessment?
No. The risks assessment process should be
proportionate to the decision being made. The
report author and others involved should consider
the impact of any associated risk(s) when deciding
whether a risk assessment is required or not. It is
the responsibility of the report author to ensure that
the risk assessment is sufficient for its purpose.  If
the impacts of identified risks are low or negligible
then it is reasonable that the risks are not formally
recorded.
What should I put in the risk
management section of the
committee report template?
Key risks surrounding a decision and how these are
or will be managed should always be highlighted
in the narrative of the report. The audience should
receive assurance that the author has carried out
a proportionate risk assessment related to the
issue and recommendations, in compliance with
the council’s decision-making risk management
guidance.
In offering this assurance the report author is
confirming that:
1. Risk assessment documentation relating to the
decision has been completed and reviewed by
relevant senior management;
2. All significant risks relating to the decision and
how these will be managed are highlighted in
the report; and
3. Risks relating to the decision have, as
appropriate, been included in Service or
Project risk registers and will be managed
and subject to monitoring and review
in accordance with the council’s risk
management strategy
Will the risk assessment be
accessible to the public?
The risk assessment will not be published with the
Committee papers (although the Committee report
will confirm that a risk assessment exists to support
the decision sought in the report). However, risk
assessments will be subject to the normal rules of
disclosure under the Freedom of Information Act
2000 and other relevant legislation. 
Page 391 of 454

Page 392

37
Risk Management Strategy 2026
Training and Awareness
Training and awareness materials will be developed
to support colleagues in their role within the
framework.
All employees and elected members are required
to complete the Introduction to Risk Management
E-learning mandatory training module.
Risk Champions and Risk Facilitators will have the
opportunity to complete accredited Enterprise Risk
Management training as part of their responsibilities.
Targeted training material will be developed to
support colleagues in their specific role within the
risk management framework.
Awareness materials will be made available to
colleagues through the most appropriate channels.
Page 392 of 454

Page 393

38
Risk Management Strategy 2026
Glossary of Risk Management Terms
Glossary of Risk Management Terms
Context Context means the external and internal parameters that organisations must consider when they manage risk.
External context includes external stakeholders, local, national, and international environment, as well as any external factors that influence objectives. It includes social,
cultural, political, legal, regulatory, technological, economic, natural, and competitive environment.
Internal context includes internal stakeholders, approach to governance, contractual relationships, capabilities, culture, and standards.
Corporate Governance The framework of accountability to users, stakeholders, and the wider community, within which organisations take decisions and lead and control their functions to achieve
their objectives
Ever Present Risk Risks that are ubiquitous in nature, are ever present within an organisation and will always command the attention of senior management
Exposure The susceptibility to loss.
Impact Effect or consequences of a risk. Examples of a range of impacts can be found in the Impact Matrix.
Inherent Risk The exposure arising from a specific risk if no controls were in place to manage it.
Likelihood The chance that something might happen. Likelihood can be defined, determined, or measured objectively or subjectively and can be expressed either qualitatively or
quantitatively.
Mitigating Action Any action that seeks to reduce the likelihood or impact of a risk event to an acceptable level.
Monitoring To supervise, check and critically observe on an ongoing  basis. Monitoring will help determine the current status and assess whether or not required or expected
performance levels are being achieved.
Operational Risk Risks associated with the day-to-day issues facing the organisation in its service delivery, i.e., human error, system failures, inadequate procedures, and controls.
Opportunity Risk An uncertain event, which should it occur, could have a potential positive effect on objectives
Probability Extent to which a risk event is likely to occur. A measure (expressed as a percentage) of likelihood.
Residual Risk The level of risk remaining taking risk control measures into account.
Risk An adverse event or set of events, which should it occur, will have an impact on the achievement of objectives. Risk is measured by the combination of the “likelihood” of
the event occurring, and the “impact” on our objectives if it does.
Risk Analysis The use of information to work out how often risk events might occur and the magnitude of their consequences.
Risk Tolerance The Council’s attitude towards risk taking, which in turn dictates the amount of risk it considers tolerable or acceptable.
Risk Appetite An expression of how much uncertainty the Council is willing to invite into its processes in pursuit of objectives.
Risk Assessment The overall process of risk identification, risk analysis and risk evaluation. 
Risk Categories Risks are categorised into different types. The Council’s categories are Strategic, Financial, Operational, Legislative & Regulatory, Human Resources and Information
Natural/Manmade Disaster
Risk Control A control is any measure or action that modifies, Controls include any policy, procedure, practice, process, technology, technique, method, or device that modifies or
regulates risk. Risk treatments become controls or modify existing controls once they are implemented. 
Risk Evaluation The process of comparing the net effect of the scores of the analysed risks to make decisions about their significance in relation to our priorities, objectives and targets. 
Risk Financing The provision of funds to meet the cost of implementing risk treatments, including, but not limited to, insurance.
Page 393 of 454

Page 394

39
Risk Management Strategy 2026
Glossary of Risk Management Terms
Risk Identification The process by which risk events, which could affect the organisation’s objectives, are identified, described, and recorded.
Risk Management The co-ordinated activities to direct and control an organisation with regard to risk. It covers the processes involved in identifying, assessing, and prioritising risks, assigning
ownership, taking actions to prevent or mitigate them, and monitoring and reviewing progress.
Risk Management Policy
Statement
A high-level statement showing how Risk Management will be handled throughout the Council.
Risk Management
Strategy
Describes the goals of applying Risk Management to the activity, a description of the process that will be adopted, the roles and responsibilities, risk thresholds, the timing
of Risk Management interventions, the deliverables, the tools, and techniques that will be used and the reporting requirements. It also describes how the process will be
co-ordinated with other management activities.
Risk Matrix A model that visually displays the relationship between the likelihood and impact of specific risks. Visually it is a 5x5 box that plots likelihood and impact as Insignificant,
Low, Medium, or High.
Risk Owner A risk owner is a person or entity that has been given the authority to manage a particular risk and is accountable for doing so.
Risk Prioritisation The process of ranking risks into a logical order by establishing how significant they are in terms of likelihood and impact (NB Impact is given priority over probability when
prioritising risks).
Risk Profile The overall picture of the Council’s, Services, or Team’s risks including the number of risks and their scores.
Risk Register A formal listing of identified risks, together with the results of the risk analysis and risk evaluation procedures, as well as details of any risk responses. Helps decision makers
prioritise resources to minimise risk to best effect and provide assurances that progress is being made.
Risk Response Selection and implementation of appropriate options to further minimise the likelihood or impact of an identified risk.
Strategic Risk Risk concerned with where the Council wants to go, how it plans to get there and how it can ensure survival.
Terminate Avoid or eliminate the risk exposure or activity giving rise to the risk so that it no longer presents a risk to manage.
Threat Risk An uncertain event, which should it occur, could have a potential negative effect on objectives
Tolerate An informed decision to accept the likelihood and the impact of a particular risk rather than trying to mitigate it further. This is usually because there are certain benefits to
be gained, or the cost and effort of implementing further control measures is disproportionate to the risk.
Transfer An informed decision to transfer all or part of the risk to another party i.e., through contract terms, insurance etc.
Treat Implement cost effective actions to modify the risk to a more tolerable level.
Uncertainty A condition where the outcome can only be estimated.
Page 394 of 454

Page 395

CC_2025_00305
Produced by
NORTH LANARKSHIRE COUNCIL
Donald Stone
Corporate Risk Manager
Chief Executives Office
Civic Centre, Windmillhill Street
Motherwell ML1 1AB
e. StoneD@northlan.gov.uk
NORTHLANARKSHIRE.GOV.UKPage 395 of 454

Page 396

Page 396 of 454

Page 397

North Lanarkshire Council Report
Does this report require to be approved?
Ref FS/CFP/P&S/Mar26 Date
☒ Yes  ☐ No
19/03/26
From Francis Scott, Chief Officer (Audit and Risk)
E-mail scottfr@northlan.gov.uk Telephone 07887 914207
Executive Summary
The Council’s Counter Fraud Policy details the Council’s approach to the prevention,
detection and investigation of fraud across all Council service areas. The most recent
version of the Policy was approved by the Policy and Strategy Committee in September
2023.
The Policy has been recently reviewed to ensure the document remains consistent with
good practice and continues to reflect the Council’s attitude, approach and response to
fraud. The content of the revised Policy remains broadly similar to the previous version.
One key addition to the Policy is a section to highlight the requirements of the Economic
Crime and Corporate Transparency Act 2023, which introduced a corporate offence of the
failure to prevent fraud. The title of the document has also been changed, from the Counter
Fraud Policy to the Corporate Fraud Policy.
Recommendation
It is recommended that the Policy and Strategy Committee:
(1) Acknowledge the key changes to the Policy and the implications of the new
legislation; and
(2) Approve the approved Corporate Fraud Policy (at Appendix 1).
The Plan for North Lanarkshire
Priority All priorities
Ambition statement All ambition statements
Programme of Work All Programmes of Work
Policy and Strategy Committee
Corporate Fraud Policy
Item 15
Page 397 of 454

Page 398

1. Background 
1.1 North Lanarkshire Council has a zero-tolerance approach to fraud. The Corporate
Fraud Policy details the Council’s approach to the prevention, detection and
investigation of fraud across all Council service areas and outlines the responsibilities
of all officers and members in relation to fraud.
1.2 This report advises the Policy and Strategy Committee of the outcome of a recent
review and revision of the Policy. 
2. Report 
2.1 The Council’s Counter Fraud Policy was approved by the Policy and Strategy
Committee in September 2023. A scheduled review of this policy was recently
undertaken to ensure that it remained relevant and up to date, consistent with good
practice and continues to reflect the Council’s attitude and response to fraud. 
2.2 While some amendments have been made to the format and structure of the Policy,
the content remains broadly similar to the version approved in 2023. 
2.3 The main change to the Policy is the inclusion of a section detailing the key elements
of the Economic Crime and Corporate Transparency Act 2023 (ECCTA), including: 
• The introduction of the offence of the failure to prevent fraud. This offence
allows large organisations to be held accountable for fraudulent acts committed
by employees, agents, subsidiaries or other associated persons. Organisations
found guilty of this offence may be subject to unlimited financial penalties on
conviction.
• A corporate defence for organisations that they will not be held liable for this
offence if they can demonstrate that they had reasonable procedures in place to
prevent fraud. To rely on this defence, an organisation must ensure its specific
risk profile, determined through fraud risk assessments, is reflected in its control
framework.
• UK Government guidance outlining the key principles organisations should follow
when establishing a fraud prevention framework as part of the corporate defence.
2.4 As part of the review, and to better align with the changes made, the title of the
document has also been changed from the Counter Fraud Policy to the Corporate
Fraud Policy.
2.5 Following approval of the Corporate Fraud Policy by Committee, the Chief Officer (Audit
and Risk) and the Chief Officer (Legal and Democratic) will undertake an exercise to
ensure that the key components of the Policy and the requirements of the new
legislation are communicated to all relevant officers for awareness and understanding. 
3. Measures of success 
3.1 Up to date policies and associated processes will contribute towards having effective
corporate fraud arrangements which are an important part of the framework designed
to help prevent and detect fraud and to deal with it effectively when it occurs. 
Page 398 of 454

Page 399

4. Supporting Documentation 
Appendix 1 – Corporate Fraud Policy 
Francis Scott
Chief Officer (Audit and Risk) 
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact   
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact   
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Sections relating to investigations and the relationship between this policy and other
relevant HR policies has been discussed with HR.
5.4 Legal impact   
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Sections relating to investigations and the relationship between this policy and other
relevant policies and statutes have been discussed with Legal Services. Page 399 of 454

Page 400

5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact   
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
New legislation introduces corporate offence of failure to prevent fraud, for which
large organisations such as the Council can be liable for unlimited financial
penalties. The defence against this is having reasonable procedures in place to
prevent fraud, including an assessment of fraud risk in the organisation.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these?
Page 400 of 454

Page 401

Yes ☐ No ☒
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC).
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out?
Yes ☐ No ☐ 
Page 401 of 454

Page 402

CORPORATE
FRAUD POLICY  
Page 402 of 454

Page 403

2 
Document control
Title Corporate Fraud Policy
Owner Francis Scott, Chief Officer (Audit and Risk) Contact scottfr@northlan.gov.uk
Governance Group Policy and Strategy Committee
Author Francis Scott, Chief Officer (Audit and Risk) Contact scottfr@northlan.gov.uk 
Revision History
Number Originator Date Review Commenced Revision description/record of change
1.0 Ken Adamson June 2023 Update and refresh of full policy 
2.0 Francis Scott December 2025 Update and refresh of full policy     
Document Approvals
Number Governance
Group
Date approval granted Date approval to be requested 
(if document still draft)
1.0 Policy and
Strategy
28/09/23 
2.0 Policy and
Strategy 
19/03/26     
Consultation Record (for most recent update)
Status of document consulted upon N/A
Stakeholders consulted/date N/A 
Strategic Alignment
The Corporate Fraud Policy highlights the Council’s zero tolerance approach to fraud and outlines how fraud risks will be
managed across the organisation and how suspected or identified fraud will be managed as part of robust corporate
governance arrangements designed to enable and support the delivery of all Council ambitions and priorities. 
Next review date
Review Date December 2027 (for approval at Policy and Strategy Committee in March 2028).
Page 403 of 454

Page 404

3 
CONTENTS
1 Introduction 4
2 Zero-Tolerance Approach 4
3 Offence of Failure to Prevent Fraud 5
4 Responsibility for Managing Fraud Risk 5
5 Fraud Reporting 7
6 Investigation Process 9
7 Investigation Outcomes 10
8 Media Contact 10
9 Joint Working 11
10 Fraud Training and Awareness 11
11 Conclusion 11 
Appendix A – Definitions of Fraud 12 
Appendix B – Examples of Fraud Risks for Council Services 13 
Appendix C – List of Related Documents 14 
Page 404 of 454

Page 405

4 
1. INTRODUCTION
1.1 The Corporate Fraud Policy outlines the Council’s commitment to preventing,
detecting and investigating fraudulent activities across all the Council’s service areas,
ensuring ethical conduct and compliance with legislation.
1.2 Fraud is defined as the deliberate use of deception or dishonesty to disadvantage or
cause loss to another person or party.  Fraud includes a wide variety of dishonest
behaviour such as theft, false accounting, embezzlement, forgery, bribery, corruption,
deception, false representation, concealment of material facts and other intentional
acts designed to deceive others for personal gain.  Fraud can occur within the Council
or can be perpetrated against the Council by outside parties.
1.3 The scope of this policy extends to all employees, elected members, service users,
contractors, agencies and suppliers and other partner organisations, including the
voluntary sector. 
2. ZERO-TOLERANCE APPROACH
2.1 North Lanarkshire Council has a zero-tolerance approach to fraud.
2.2 The Council expects its staff to act honestly, with integrity and to safeguard public
resources for which they are responsible.  The Council aims to conduct its business in
an honest and ethical manner and is committed to acting professionally, fairly and
with integrity in all its dealings and relationships wherever it operates.
2.3 Any instances of fraud will be investigated thoroughly, and employees found to have
been involved in fraudulent activity will be subject to disciplinary action, including
termination of employment and other relevant legal consequences.  The Council will
seek to recover any loss suffered because of fraud.
2.4 The Council is committed to ensuring that opportunities for fraud are minimised and
will actively co-operate and share information with other local authorities and public
sector bodies to assist in the prevention, detection and investigation of fraud. 
Page 405 of 454

Page 406

5 
3. OFFENCE OF FAILURE TO PREVENT FRAUD
3.1 The Economic Crime and Corporate Transparency Act 2023 (ECCTA) introduced the
new offence of the failure to prevent fraud.  This objective of this provision is to make
it easier to hold large organisations (such as the Council) accountable for fraudulent
acts committed by employees, agents, subsidiaries or other associated persons. 
Organisations found guilty of this offence may be subject to unlimited financial
penalties on conviction.  
3.2 ECCTA provides a defence for organisations that they will not be held liable for the
“failure to prevent fraud” offence if it can demonstrate that, at the time the fraud was
committed, it had reasonable procedures in place to prevent fraud.  To rely on this
defence, organisations must implement procedures that reflect their specific risk
profile, determined through risk assessment – the Council should assess the
likelihood of frauds being committed and based on those findings, review and revise
their existing controls.
3.3 The UK Government has issued guidance outlining six key principles that
organisations should follow when establishing a fraud prevention framework:
• Top Level Commitment – senior management must actively demonstrate a
clear commitment to the prevention of fraud.
• Risk Assessment – organisations should evaluate the nature and extent of their
exposure to fraud risk, ensuring these assessments are documented and
reviewed.
• Fraud Prevention Procedures – based on identified risks, organisations should
implement proportionate, risk-based procedures as part of a comprehensive
fraud prevention strategy.
• Due Diligence – organisations must carry out appropriate, risk-based due
diligence to identify and mitigate potential fraud risks.
• Effective Communication – fraud prevention procedures must be clearly
communicated and embedded across the organisation, with strong emphasis
on training and ongoing education.
• Monitoring and Review – organisations should continuously monitor the
effectiveness of their procedures and make improvements where necessary to
ensure they remain fit for purpose. 
4. RESPONSIBILITY FOR MANAGING FRAUD RISK
4.1 Managers, staff and elected members must always be alert to the risk of fraud.  The
prevention, detection and reporting of fraud are the responsibility of all members,
officers and employees of the Council.
4.2 The Chief Executive has overall responsibility for the operations and activities of the
Council.  This includes overall responsibility to ensure that the Council’s management
arrangements in respect of fraud are adequate and effective and that any lessons to
be learned corporately from any fraud occurrences arising are appropriately
Page 406 of 454

Page 407

6 
addressed.
4.3 The Deputy Chief Executive and all Chief Officers are expected to display high
personal standards of conduct in accordance with the Chief Officers’ Code of Conduct
and are responsible for establishing and maintaining a sound system of internal
control within their areas of responsibility which supports the achievement of
Council policies, aims and objectives.  The system of internal control is designed to
respond to and manage the wide range of risks which the Council faces, including
minimising the scope for fraud.  Chief Officers should ensure that their employees
are made aware that they should report any matter arising which involves, or is
thought to involve, a fraud or irregularity.
4.4 The Chief Officer (Finance and Technology) has a duty, in accordance with Section
95 of The Local Government (Scotland) Act 1973, to make proper provision for the
administration of the Council’s financial affairs.  Proper administration includes
ensuring that an adequate system of financial control exists and operates effectively
throughout the Council.
4.5 The Chief Officer (Audit and Risk) is responsible for:
• Reviewing and reporting on the Council’s control environment for the
prevention of fraud.
• Establishing and maintaining an effective corporate fraud policy,
commensurate to the level of fraud risk identified, including establishing
appropriate mechanisms for staff to report suspected fraud risk issues.
• Disseminating the Council’s Corporate Fraud Policy to all staff to ensure that
they are aware of their responsibilities in relation to preventing and combating
fraud.
• Ensuring that vigorous, prompt and proportionate investigations are carried out
where fraud occurs or is suspected, and reporting to the Service, Chief Executive
and Audit and Scrutiny Panel on the outcome of these investigations.
• Co-ordinating assurances about the effectiveness of anti-fraud arrangements
to support the Statement of Internal Financial Control and the Council’s Annual
Governance Statement.
• Notifying the Council’s External Auditors regarding all frauds over £5,000.
• Liaising on fraud matters with other relevant stakeholders, including the Audit
and Scrutiny Panel and the Risk Management Corporate Working Group.
4.6 All Chief Officers and managers are responsible for:
• In line with the Council’s Risk Management Strategy, identifying and analysing
potential fraud risks for their service area.
• Designing and implementing an adequate system of internal control to mitigate
these risks and ensuring that that these controls are operating effectively and
are being complied with.
• Ensuring that any fraud or suspected fraud or irregularity is reported promptly.
4.7 All employees and elected members are responsible for:
Page 407 of 454

Page 408

7 
• Complying with relevant codes of conduct, council policies and procedures,
including declaring and registering relevant conflicts of interest and offers of
gifts or hospitality.
• Ensuring that the Council's procedures and management arrangements
designed to mitigate fraud and corruption risks facing the Council operate
effectively.
• Reporting any suspicion of fraud or irregularity promptly. 
4.8 The Audit and Risk team is responsible for:
• Assisting in the prevention and detection of fraud by examining and evaluating
the adequacy and effectiveness of controls in line with the annual Internal Audit
Plan and in accordance with the Global Internal Audit Standards (GIAS).
• Ensuring management has considered and identified the possibility of fraud as
a business risk and has included any such fraud risks in their risk register. 
5. FRAUD REPORTING
EMPLOYEES
5.1 The Council accepts that, to enable the process for reporting concerns of serious
wrongdoing within the Council to have credibility, employees must have the
confidence that any matter highlighted will be treated confidentially and handled with
discretion and tact.  
5.2 In the first instance, employees should report any issue or suspicion of fraud or
irregularity at the earliest possible stage, to their Line Manager or Chief Officer.  If they
do not feel that this is appropriate, they may contact the Chief Officer (Audit and Risk)
or email the Internal Audit mailbox internalaudit@northlan.gov.uk.  Anonymous
reports will be accepted and followed up by Internal Audit where possible, however,
this should be avoided as it could hinder the investigation if further information is
required.  
5.3 An employee wishing to raise any matter on a confidential basis may do so using the
Council’s whistleblowing arrangements, which are part of the Public Interest
Disclosures Policy.  This Policy is consistent with the Public Interest Disclosure Act
1998, with respect to the disclosure of information by employees, and all matters
highlighted under these arrangements will be dealt with in confidence and in strict
accordance with the terms of the policy.  This statute protects the legitimate personal
interests of staff irrespective of how an allegation is highlighted.   The Policy is located
at Whistleblowing Procedure.
5.4 Individuals who refuse to accept an offer or bribe and wish to raise concerns or report
another’s wrongdoing are sometimes worried out possible repercussions.  The
Council aims to encourage openness and will aim to support anyone who raises
genuine concerns in good faith under the Public Interest Disclosures policy.  Whilst
reports of suspected or actual fraud will be dealt with sensitively, it may not always be
possible to deal with fraud allegations on a confidential basis, however, the Council
Page 408 of 454

Page 409

8 
will, wherever possible, observe the wishes of an employee raising concerns who does
not wish their identity to be disclosed.
5.5 The Council is committed to ensuring that no-one suffers any detrimental treatment
by refusing to take part in bribery or corruption or reporting suspicion of fraud. 
Detrimental treatment includes dismissal, disciplinary action, threats or other
unfavourable treatment connected with raising a concern.  If someone believes that
they have suffered such treatment, they should inform the officer who received the
original report immediately.  If the matter is not remedied, this should be raised
formally using the Dignity at Work Policy. 
ELECTED MEMBERS, THIRD PARTIES AND MEMBERS OF THE PUBLIC
5.6 The Council is committed to dealing with any allegation of fraud brought to its
attention by Elected Members, third parties (e.g. contractors, suppliers, organisations)
and members of the public.  Elected Members should report any concerns of fraud
directly to the Chief Officer (Audit and Risk).  Third parties and members of the public
can contact the Chief Officer (Audit and Risk) or email internalaudit@northlan.gov.uk. 
BENEFIT FRAUD
5.7 The Department for Work and Pensions (DWP) Single Fraud Investigation Service (SFIS)
are responsible for investigating Housing Benefit Fraud. All matters relating to the
allegation of fraud in respect of Housing Benefit should be reported directly to the
DWP via the online referral form, which can be found here.    Further information on
reporting fraud relating to benefits administered by Social Security Scotland can be
found here.
5.8 Fraud referrals from Council staff should initially be made to the Council’s Appeals
and Adjudication team where the report will be added to the SFIS referral form and
passed for investigation. 
PROCEDURES FOR CHIEF OFFICERS AND MANAGERS NOTIFIED OF FRAUD
5.9 Managers and Chief Officers notified of instances of fraud or irregularity must
immediately notify the Chief Officer (Audit and Risk).
5.10 On being informed by an employee of a fraud, it is important that the manager
receiving the information deals with it appropriately.  In particular, the manager
should:
• Deal with the employee giving the information in a way that shows that their
concerns are being taken seriously.
• Not belittle or dismiss the information.
• Respect, as far as possible, the confidentiality of the employee.
• Attempt to identify where any evidence may be but should not attempt to
obtain it, or question anybody.
• Pass the information to the Chief Officer (Audit and Risk).
5.11 Line managers should not conduct their own investigations before informing the Chief
Page 409 of 454

Page 410

9 
Officer (Audit and Risk) as this may compromise any later investigation, invalidate
evidence and consequently enable someone who has committed fraud to avoid
punishment.
5.12 Circumstances may require the temporary relocation or suspension of an employee. 
Such decisions rest with the appropriate Chief Officer and must be in accordance with
relevant Council policies including the Discipline Policy.  It is recommended that HR
advice is sought before a member of staff is suspended.  In circumstances where an
employee is suspended, they should be escorted from the premises immediately, only
being allowed to remove personal belongings under supervision.  All IT devices held
by the employee should be retrieved and the employee’s access to the Council’s
network should be suspended.  The Chief Officer (Audit and Risk) must be advised of
any such action taken by the Chief Officer as soon as possible. 
6. INVESTIGATION PROCESS
6.1 The Chief Officer (Audit and Risk) is responsible for determining what course of action
should be taken when notified of allegations or concerns of possible fraud.  The audit
approach to the investigation of a potential fraud is likely to vary depending on the
nature and complexity of the fraud, the number and seniority of employees involved
and the nature of the Service in which the suspected fraud has occurred.  All
investigations will be undertaken in a manner that ensures confidentiality and
fairness, and where possible the anonymity of those reporting the fraud will be
respected.
6.2 Internal Audit’s role in relation to fraud is to act as an independent investigator to
establish whether there is any substance to allegations made.  This role includes
establishing the facts as far as possible, quantifying any loss, identifying any control
weaknesses or failures, recommending improvements to address control
weaknesses, providing a written factual report on the fraud to the relevant Chief
Officer and attending any subsequent disciplinary proceedings, where appropriate, in
the role of witness.
6.3 The Council’s Financial Regulations and Internal Audit Charter give Internal Audit staff
unrestricted access to all Council records and authority to enter all Council premises
or land at all reasonable times.  Internal Audit staff can also require and expect to
receive any explanations from Council staff as considered necessary to fulfil their role
and responsibilities.
6.4 As part of any fraud investigation, Internal Audit will be required to interview Council
employees.  This may take the form of a general fact-finding interview, or the
employee may be called to an investigative interview to answer questions specifically
in relation to the alleged or suspected fraudulent activity.  In the latter case, the
employee will be notified in advance of their right to Trade Union or other
representation at the interview.  In either type of interview, the employee will be
advised of the reasons for the interview and, where appropriate, cautioned by Internal
Audit staff, thus ensuring any statement taken and subsequently used as evidence in
disciplinary proceedings or in court, will not be rejected as inadmissible.
Page 410 of 454

Page 411

10 
6.5 Two officers will always be present when conducting any such interviews, one asking
questions and one taking notes.
6.6 On completion of an investigation, a written report will be prepared by the Chief
Officer (Audit and Risk) and sent to the relevant Chief Officer detailing the findings of
the investigation.  The report may include recommendations to improve controls, to
mitigate the threat of similar frauds re-occurring in the future.  Details of this report
will also be presented to the Audit and Scrutiny Panel.
6.7 If the value of the fraud is greater than £5,000, the Chief Officer (Audit and Risk) is
required to report the details to the Council’s External Auditor. 
7. INVESTIGATION OUTCOMES
7.1 Fraud is a serious offence against the Council, and several outcomes are possible from
the investigation processes.
7.2 Employees found to have been involved in fraudulent activity will be subject to
disciplinary action in line with the Council’s Discipline Policy.  Internal Audit staff
involved in the investigation, will attend any subsequent disciplinary hearing as a
witness, if requested.  Where the disciplinary process concludes that the employee’s
actions are deemed to be gross misconduct, the employee can be summarily
dismissed with no entitlement to notice.
7.3 If there is evidence to support involvement in an alleged criminal offence, the Chief
Officer (Audit and Risk) will make the decision to refer the case to Police Scotland.  Any
such decision requires to be approved by the Chief Executive.  Where the incident
involves a break-in, Services are authorised to contact the Police immediately.
7.4 The Council will seek to recover any financial loss it has suffered through fraudulent
or corrupt activity, through means such as salary recovery, court compensation or by
pursuing civil action.  Any party or person committing fraudulent activity or behaviour
against the Council may be subject to relevant measures as available to the Council
and other relevant agencies under the law.  These may include warnings, recovery of
losses through legal action, fines, interest charges and custodial sentences. 
8. MEDIA CONTACT
8.1 The Senior Strategic Communications Manager has been designated by the Chief
Executive as the appropriate officer to manage all contact with the media to ensure
that the release of information is properly co-ordinated. 
8.2 No statements relating to actual or alleged fraud, or any ongoing or complete
investigations should made to the press or on social media by any member of staff
unless through the Senior Strategic Communications Manager, who will liaise with the
Chief Executive, Deputy Chief Executive and the Chief Officer (Audit and Risk). 
Page 411 of 454

Page 412

11 
9. JOINT WORKING
9.1 The Council participates in the National Fraud Initiative, a comprehensive data
matching exercise between public bodies to highlight potential frauds and errors. 
Internal Audit plan and co-ordinate the submission of data and investigation of
matches identified. 
9.2 The Council is an active member of the National Anti-Fraud Network (NAFN) and the
Scottish Local Authority Investigator’s Group (SLAIG) and liaises closely with other
public sector bodies and fraud professionals to raise awareness of the risk of fraud
and share information, knowledge and good practice regarding common fraud risks.  
9.3 The Council, where appropriate, provides information to other public bodies which
has been requested under Schedule 2 part 1(2) of the Data Protection Act 2018 to
assist in the prevention and detection of crime. The Chief Officer (Legal, Democratic
and Strategy) co-ordinates this process and maintains a log of all requests received,
together with appropriate documentation. 
10. FRAUD TRAINING AND AWARENESS
10.1 Training on Fraud Awareness in Local Government is available to all staff as an e-
Learning module.  The content of this training has been updated to reflect the
requirements of ECCTA.
10.2 Internal Audit will undertake exercises to raise fraud awareness amongst Council
employees on a periodic basis, including the communication of the Corporate Fraud
Policy. 
11. CONCLUSION
11.1 The Council recognises the importance of making best use of public resources and of
demonstrating high standards of corporate governance.  The Council takes a zero-
tolerance approach to fraud, and all cases of actual and suspected fraud will be
vigorously and promptly investigated, with appropriate action taken.
11.2 The policy will be scheduled for review every two years and may be updated within
this timescale to reflect any required amendments or changes to legislation. 
Page 412 of 454

Page 413

12 
APPENDIX A – DEFINITIONS OF FRAUD
Bribery A bribe is an offer, promise, gift or receipt of a financial or other
advantage, designed to induce another person to act improperly in
the performance of their functions, to reward them for acting
improperly or where the recipient would act improperly by accepting. 
A person acts improperly where they act illegally, unethically,
contrary to an expectation of good faith or impartiality, or where they
abuse a position of trust.  The improper acts may be in relation to any
business or professional activities, public functions, acts in the course
of employment, or other activities by, or on behalf of, any
organisation of any kind.
Corruption Corruption is the abuse of entrusted power or position for personal
gain.
Money Laundering Money laundering is the process by which criminally obtained money
or other criminal property is exchanged for ‘clean’ money or other
assets with no obvious link to their criminal origins.  The aim of this
activity is to legitimise the possession of such monies through
circulation, and this effectively leads to ‘clean’ funds being received in
exchange.
Insider Threat Insider threat is a perceived threat to an organisation that comes
from people within the organisation who have inside information
concerning the organisation’s security practices, data and computer
systems.  The threat may involve fraud, theft of confidential or
commercially valuable information, theft of intellectual property or
sabotage of computer systems.
Serious Organised
Crime
Serious organised crime (SOC) refers to criminal activity that is
planned, co-ordinated and committed by individuals or groups.  The
motivation for these crimes is often financial gain.  Examples of SOC
include money laundering, fraud, bribery and corruption, cyber-
crime, illegal firearms, illegal drugs, child sexual exploitation, modern
slavery and human trafficking.
Tax Evasion The Criminal Finances Act 2017 created two new corporate criminal
offences in relation to the failure to prevent facilitation of UK and of
foreign tax evasion.  Tax evasion is defined as the deliberate and
dishonest evasion of tax or knowingly taking steps to facilitate
another person to evade tax.  The Council would be guilty of an
offence if a person commits a UK tax evasion facilitation offence
when acting in the capacity of a person associated with the Council. 
Page 413 of 454

Page 414

13 
APPENDIX B – EXAMPLES OF FRAUD RISKS FOR COUNCIL SERVICES
Payroll False employees; fraudulent overtime claims or expenses
Employees Misappropriation of money, equipment, expenses; time recording irregularities;
undeclared conflicts of interest
Tenancy Fraudulent applications for housing/successions of tenancy; subletting of
properties
Benefits  Fraudulent applications; failure to declare sources of income or capital; failure to
declare changes of circumstances (DWP responsible for benefit fraud)
Council tax Fraudulent applications for discounts and exemptions or council tax support
Business rates Fraudulent applications for exemptions and reliefs; unlisted properties
Procurement  Tendering issues including conflicts of interest, collusion, disclosure of sensitive
information; attempting to influence Council processes and/or decision-making
Payment of
creditors
False invoices, inappropriate changes of bank details; double invoicing
Social care
fraud
Overstatement of needs through false declaration; multiple claims across
authorities; third party financial abuse by carer, family or organisations;
posthumous continuation of claims; including personal budgets
Schools Theft of monies
Identity fraud False identity/fictitious persons applying for services/ payments
Blue badges Use of counterfeit/altered badges; use when disabled person is not in the vehicle;
use of deceased person’s badge; corporate badges being misused by employees
Grants Fraudulent claims; work not carried out; funds diverted; ineligibility not declared
Cyber crime A range of fraud types resulting in diversion of funds, creation of false applications
for services and payments
Insurance
Fraud
False claims, including slips and trips
Concessionary
travel
Use of concession by ineligible person
Immigration False entitlement to services and payments, sham marriages
Tax evasion Failing to identify workers/contractors that should be paid via payroll (IR35), failure
to deduct income tax at the correct rate, Construction Industry Scheme – suppliers
submitting artificially low labour breakdown on their invoices to avoid tax being
deducted on labour element
Page 414 of 454

Page 415

14 
APPENDIX C – LIST OF RELATED DOCUMENTS
The following list of documents includes other existing policies, procedures and guidance
notes which touch upon issues which are of relevance, or are closely related, to fraud
matters.  The list is not exhaustive and will be subject to periodic update without requiring
a formal review of this policy. 
• Scheme of Delegation
• Contract Standing Orders
• Financial Regulations
• Public Interest Disclosures Policy (Whistleblowing)
• Discipline Policy
• Chief Officers’ Code of Conduct
• Employees’ Code of Conduct
• Acceptable Use of ICT Policy
• Information Security Policy
• Policy and Procedure on Directed Surveillance, Use of Covert Human Intelligence
Sources and Obtaining Communications Data
• Procurement Journey Route maps and tender toolkit 
Page 415 of 454

Page 416

Page 416 of 454

Page 417

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    GT/VR Date 19/03/26 
Strategic Capital Investment Programme 2024/25 to 2028/29 -
Profile 
From  Andrew McPherson, Depute Chief Executive  
E-mail McPhersonA@northlan.gov.uk Telephone 07583 010692 
Executive Summary
This report provides an annual update on the Council’s Strategic Capital Investment
Programme including an update on available resources and expected profile of expenditure
of the remainder of the current five-year capital planning period from 2024/25 to 2028/29. 
The report highlights record levels of capital investment of £880.942m over the five-year
period as the Council continues the delivery of its long-term place shaping transformation
of North Lanarkshire’s towns and communities. Alongside record levels of investment in
the Council’s housing provision through the Housing Revenue Account, this represents
potential investment of £1.658 billion in North Lanarkshire’s town and communities. 
Key highlights in the proposed investment programme include: 
• £347m to continue investment in the Town and Community Hub programme 
• City Deal investment of £97m, including resources to progress the East Airdrie Link
Road project, 
• £44m investment in the Council’s Economic Regeneration Delivery Plan to support
the ongoing transformation of North Lanarkshire’s town centres, including ongoing
work to transform Cumbernauld town centre, 
• £41m key infrastructure investment in bridges, flooding, active travel and road safety
improvements, 
• £19 million investment in the Parks Masterplan, including funding to enable the
redevelopment of Strathclyde Park Watersports Centre, 
• £23 million investment in business and digital systems as the Council continues its
digital offering, and 
• £14 million investment in Community Boards with a key aim of evolving the Council’s
approach to facilitating community asset transfers. 
Recommendations
It is recommended that Policy and Strategy Committee: 
(1) Acknowledges the forecast resources available to fund the capital programme, 
(2) Approves the 2026/27 Strategic Capital Investment Programme as outlined in
Appendix 1, 
Item 16
Page 417 of 454

Page 418

1. Background 
1.1.  The Council’s capital investment plans are underpinned by the Capital Strategy 2024/25
to 2028/29 that was approved at Policy and Strategy Committee in March 2024. The
Capital Strategy aims to create an asset base that meets the aspiration for North
Lanarkshire to be the place to Live, Learn, Work, Invest and Visit. 
1.2.  The Council adopted this strategy in preparing the Council’s Strategic Capital Investment
Programme, also approved at Policy and Strategy Committee in March 2024. At that time
the programme recognised General Services investment of £659.509 million over the five-
year capital planning period to support the Council’s aims for place shaping transformation
of North Lanarkshire’s towns and communities. Following an annual update in March 2025
investment increased to a record £856 million for the five-year period.   
1.3.  The current capital investment plan is aligned to the Plan for North Lanarkshire to 2028/29
through to Programme of Work activities and importantly aligns with the Council’s
Corporate Asset Management Plan approved in 2022. 
1.4.  The capital plan continues to ensure capital investment resources are maximised by
levering additional funding through the Council’s transformative Community Investment
Fund. 
2. Report 
Updated Forecast Resources 
2.1 The updated Strategic Capital Investment Programme has been developed based on the
latest estimates of available resources, including government grant, Community
Investment Fund and Prudential Borrowing.  The following table provides an update on
the five-year resource profile: 
2.2  The forecast resources of £880.942 million represents an increase of £24.406 million from
the capital budget approved by Policy and Strategy Committee in March 2025. 
(3) Approves the updated profile of the Strategic Capital Investment Programme from
2027/28 to 2028/29 as outlined in Appendix 1, 
(4) Acknowledges the Trend Based Adjustment applied as detailed in paragraph 2.15, 
(5) Approves the updated Terms of Reference for the Strategic Capital Delivery Group
in Appendix 2. 
(6) Acknowledges that a new five-year Strategic Capital Investment Programme
2027/28 to 2031/32 will be brought to Policy and Strategy Committee in December
2026 for consideration.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Page 418 of 454

Page 419

General Capital Grant 
2.3 The General Capital Grant for 2026/27 has been updated to reflect the confirmed Core
General Capital Grant of £23.923 million which represents an increase from previously
assumed figures of £5.851 million.   
In addition, both the 2024/25 and 2025/26 additional capital grant was provided following
the Scottish Government’s decision to replace £20.000 million (each year) of Council
General Revenue Grant with Capital Grant to support the pay award. This additional
capital funding reduced the need for borrowing within the capital programme. 
External Income Specific Grants 
2.4 Since the 2025 update to the capital investment strategy, additional External Funding has 
been accounted for of £18.555 million bringing the total external capital funding in support 
of the Council’s capital programme forecast to £90.306 million over the five-year period. 
This is largely reflective of City Deal Grant and known Scottish Government grant 
contributions for areas such as Vacant and Derelict Land Fund, Regeneration Capital 
Grant Fund and Placed Based Investment Programme. As well as accounting for 
developer contributions of £7.640 million reflecting planning obligations linked to new 
developments which can support, for example, education infrastructure, play areas, road 
infrastructure etc. depending on the legal agreement with the developer. 
Community Investment Fund 
2.5 The annual Community Investment Fund update was presented to Policy and Strategy 
Committee in December 2025 highlighting a slight decrease in resources of £13.247 
million over the revised 10-year period to 2033/34. Given the change in assumption is 
immaterial over the ten-year period and recognising increases in both External Funding 
and Government Grant, combined with a trend to levels of slippage within the programme, 
no resource adjustment has been made for this.   This will however continue to be subject 
to annual review with amendments made in future programmes as required. 
2.6  A key part of the Community Investment Fund modelling is the requirement to complete
an annual review of the assumptions and projections. Each review has been presented to
Policy and Strategy Committee and in the event that the assumptions change significantly
this would be considered by the Council’s Strategic Capital Delivery Group (SCDG) in line
with its Terms of Reference and ensuring ongoing compliance with the principles of the
Council’s Capital Strategy.  
2.7  The annual review includes a sensitivity analysis indicating the impact of a significant
changes in assumptions linked to decisions of the Council to earmark Council Tax
Funding Profile
Year 1 Year 2 Year 3 Year 4 Year 5 5 Year Total
2024/25 2025/26 2026/27 2027/28 2028/29
£000 £000 £000 £000 £000 £000
Core General Capital Grant (GCG) 23,350 27,637 23,923 21,334 20,254 116,498
Capital Grant in Lieu of Revenue Grant 20,000 20,000 0 0 0 40,000
Capital receipts 6,288 3,375 3,375 3,375 337 16,750
Residual Pension Cost Underspends 21,375 23,416 0 0 0 44,791
Service Concession One-Off Benefit 0 0 0 22,400 22,400 44,800
Council Borrowing (inc. Community
Investment Fund)
24,297 80,796 83,258 108,447 230,999 527,797
External Income Specific Grants 23,739 26,734 10,908 22,027 6,898 90,306
Total Funding 119,049 181,958 121,465 177,583 280,887 880,942
Page 419 of 454

Page 420

increases to support the Community Investment Fund, the wider economic climate
including any impacts on house building and cost of borrowing assumptions. The next
scheduled update will be presented to Policy and Strategy Committee later in 2026. 
Capital Receipts 
2.8 Projected capital receipts of £16.750 million have been included in the programme based 
on the current estimates of likely future receipts from asset sales. Capital receipts can be 
significantly influenced by external market factors so, like all areas of capital resources, 
this will be kept under continual review. 
Residual Pension Cost Underspends 
2.9 The programme continues to reflect the application of one-off resources totalling £44.791 
million from the cost reductions associated with Strathclyde Pension Fund employer 
contributions to augment the capital programme and the Town and Community Hub 
programme as approved by Council in February 2024.  
Service Concessions  
2.10 Assumptions of applying the one of benefit arising from the change in accounting
treatment of existing service concession arrangements remain unchanged. 
One off Investment 
2.11 As part of the 2026/27 Budget setting in February 2026, £10 million was allocated from
reserves to support one off investment, some of which will be specifically allocated for
capital purposes. Services are currently finalising their spending profiles for this funding
and will be incorporated into the first financial monitoring reports for 2026/27 presented at
committee cycle 3.     
Strategic Capital Investment Programme 
2.12 The following table outlines the updated programme phasing over the current five-year
capital planning period per service area:
Page 420 of 454

Page 421

2.13 This programme delivers significant ongoing capital investment in North Lanarkshire’s
communities which will support the Council’s ambitions for place making transformation
while supporting the creation and maintenance of jobs in the local economy. It should be
noted that modelling is based on the continuation of 2% ring fencing of Council Tax
increases in 2027/28 for allocation to the Community Investment Fund which follows a
similar approach delivered as part of the 2026/27 budget setting process. This will be
subject to annual review as part of the Revenue Budget setting process. 
2.14  In line with the SCDG Terms of Reference, the programme outlined above and in Appendix
1 will remain under continual review as the programme evolves and will continue to be
reported for approval at Policy and Strategy Committee in Cycle 1 each year to ensure
that the programme continues to reflect any changes in priorities and / or changes in the
resources available. 
2.15  A 10% Trend-Based Adjustment has been applied to reflect historic profiling challenges in
delivering major capital projects, often caused by procurement challenges, contractor
issues, and site conditions. This adjustment provides a more realistic forecast for the
Treasury Management Strategy and informs the Council’s borrowing needs. While the full
programme investment is approved, this reduction will be applied at theme level during
monitoring to recognise the practical programming challenges inherent in the delivery of
some projects.
Future Years 
2.16 Committee has previously been informed of risks associated with expenditure
requirements out with the current five-year capital planning period to 2028/29. These
include commitments for the City Deal programme in areas such as the East Airdrie Link
Road. 
2.17  In planning for these future commitments, Committee should be aware that they may limit
scope for other capital investment priorities or may require re-prioritisation of projects. In
addition, this may create additional recurring revenue consequences. These potential
Expenditure Profile
Year 1 Year 2 Year 3 Year 4 Year 5 5 Year Total
2024/25 2025/26 2026/27 2027/28 2028/29
£000 £000 £000 £000 £000 £000
Assets and Procurement 24,481 29,781 33,508 46,055 20,032 153,857
Town and Community Hubs 38,449 78,773 49,493 12,648 167,432 346,794
Community Operations 23,800 32,222 32,153 28,822 18,657 135,654
Place 24,888 31,901 22,697 80,576 27,316 187,378
Housing and Communities 1,789 2,251 4,517 2,850 3,070 14,477
Total Enterprise and Communities 113,407 174,927 142,368 170,952 236,507 838,161
Adult Social Care 2,007 2,364 1,994 2,303 2,303 10,971
Chief Executives (Finance & Technology) 3,635 4,666 7,468 4,328 3,057 23,155
Corporate Contingency 0 0 0 0 8,655 8,655
Trend Based Adjustment 0 0 (15,183) 0 15,183 0
Total Expenditure 119,049 181,958 136,648 177,583 265,704 880,942
Project / Theme
Page 421 of 454

Page 422

consequences will be monitored through the SCDG and, if appropriate, factored into the
Council’s Medium Term Financial Plan. 
2.18 As agreed during the 2026/27 revenue budget setting process, a new five-year Capital
Programme for 2027/28 to 2031/32 will now be developed. Officers will commence
preparation of the programme for consideration by the Policy and Strategy Committee in
December 2026. The programme will incorporate proposals for the additional £32.122
million of capital funding approved as part of the revenue budget decisions.
Housing Revenue Account Capital Programme 
2.19  While this report focuses on the Council’s General Fund capital programme, Committee
should be aware of the record levels of forecast investment in the Council’s current and
future housing stock. Over the same 2024/25 to 2028/29 period the HRA’s 30-year
business plan assumption includes forecast investment of £777 million across the
mainstream programme and new supply programme. This represents the current planning
assumption while recognising that it continues to be subject to agreement on future
investment targets and funding from rental increases. 
2.20  Combining the updated General Fund Strategic Capital Investment Programme with
forecast investment in the Housing Revenue Account means that the Council currently
forecasts total Community Investment of £1.658 billion within this five-year period. 
Capital Strategy 
2.21  In accordance with Prudential Code requirements, the Council carries out ongoing reviews
of the Capital Strategy. The most recent Capital Strategy to 2028/29 was approved at
Policy and Strategy Committee in March 2024. At this stage no changes are required to
the strategy. 
Review of Strategic Capital Delivery Group Terms of Reference 
2.22  Following a change to the Council’s senior management team structure as outlined in the
‘Realising North Lanarkshire as the place to live, learn, work, invest, and visit’ report to
Policy and Strategy Committee in December 2025, the SCDG has reviewed its Terms of
Reference. 
2.23  The changes are summarised as follows: 
• Updated membership to reflect senior management team changes, 
• Provision of clarity around eligibility and approval of use of the Corporate Capital
Contingency as approved by the SCDG
2.24  Committee is asked to approve the revised Terms of Reference. 
3. Measures of success 
3.1  The SCDG will continue to monitor the financial performance and operational delivery 
of the strategic capital investment programme to ensure completion of the programme 
in line with available resources.   
Page 422 of 454

Page 423

4. Supporting documentation 
4.1 Appendix 1  Strategic Capital Investment Programme 2024/25 to 2028/29 – Detailed 
Service Profile. 
4.2 Appendix 2 Strategic Capital Delivery Group – Terms of Reference and Governance 
Framework 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 423 of 454

Page 424

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The financial impacts are outlined within the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 424 of 454

Page 425

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Through SCDG the Council will be managing ongoing risks associated with the
strategic capital investment programme, including but not limited to: 
• Failure to spend in-year capital grant which may result in any unspent portion
being returned to the Scottish Government. However, given the significant level
of Community Investment Fund investment this risk is currently deemed to be
low. 
• Project delays and programme issues that impact on the delivery of the
programme and result in increased costs or reduced outcomes. These risks will
be managed through individual project governance arrangements with
oversight provided by SCDG. 
• Commitments beyond the current 5-year cycle will continue to be monitored
and refined with updated funding strategies and incorporated into the Council’s
established medium term financial planning processes.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 425 of 454

Page 426

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 426 of 454

Page 427

Strategic Capital Investment Programme 2024/25 - 2028/29 - Detailed Service Profile Appendix 1
Year 1 Year 2 Year 3 Year 4 Year 5 Total
2024/25 2025/26 2026/27 2027/28 2028/29
£ £ £ £ £ £
Assets and Procurement
Maintaining Existing Assets (windows, re-roofing, re-wiring and condition survey
works for the Council's building assets)
6,978,815             8,204,307             7,782,187             10,254,434           4,986,925             38,206,668          
Maintaining Existing Assets (Targeted Investment per Budget Decision
February 2025)
-                       4,957,184             10,580,477           19,655,000           9,463,847             44,656,508          
Carbon Management 1,466,951             1,554,477             433,513                798,560                388,982                4,642,483            
Office Rationalisation 2,818,958             1,065,718             4,104,139             5,602,998             800,000                14,391,813          
Health & wellbeing and Digital Classrooms 153,735                150,759                150,000                150,000                92,534                  697,028               
Rationalisation including ASN & Social Work 3,894,601             5,563,855             1,000,000             -                       -                       10,458,456          
Curriculum Development 328,144                555,908                955,000                223,632                258,103                2,320,787            
Sustainable Estate 1,513,969             902,148                1,030,734             3,104,059             1,000,000             7,550,910            
Outdoor Education and Outdoor Spaces 3,929,363             603,870                400,000                200,000                24,000                  5,157,233            
Future Capital Receipts Investment 484,046                957,879                586,284                596,926                557,834                3,182,969            
Design Fees 1,641,980             1,773,185             1,928,284             1,984,465             1,519,009             8,846,923            
1140 Early Learning and Childcare Expansion 682,004                162,000                -                       -                       -                       844,004               
Water Quality 78,843                  113,653                95,000                  110,000                105,000                502,496               
Demolitions / RAAC Repairs 509,587                3,215,616             4,462,797             3,375,000             835,842                12,398,842          
Sub-Total Assets and Procurement 24,480,996           29,780,559           33,508,415           46,055,074           20,032,076           153,857,120        
Town and Community Hubs
Town and Community Hubs 38,448,593           78,772,579           49,492,718           12,648,113           167,432,010         346,794,013        
Sub Total Town and Community Hubs 38,448,593           78,772,579           49,492,718           12,648,113           167,432,010         346,794,013        
Community Operations
Operational and Infrastructure Development 8,507,070             7,213,833             7,300,304             6,811,440             2,210,951                         32,043,598
Greenspace  and Cemeteries 2,878,779             3,704,153             2,918,957             3,958,749             3,819,483                         17,280,121
Greenspace Climate Resilience and Wellbeing 635,488                912,893                97,750                  97,750                  97,750                               1,841,631
Parks Master Plan (including Strathclyde Park Watersports Centre
Redevelopment)
1,149,231             1,901,709             9,012,729             6,283,567             782,634                            19,129,870
Roads and Street Lighting/Asset Mgt 10,275,977           17,711,140           12,178,910           11,142,321           11,218,546                       62,526,894
Contaminated Land and Resilience 353,610                777,922                644,210                528,663                527,644                             2,832,049
Sub-Total Community Operations 23,800,155           32,221,650           32,152,860           28,822,490           18,657,008           135,654,163        
Place
Economic Regeneration (including investment in town centre regeneration and
business and industrial infrastructure)
8,882,681             9,911,736             6,548,529             6,872,371             11,624,744           43,840,061          
City Deal 6,166,532             6,964,191             9,508,285             66,256,254           7,911,495             96,806,757          
Enterprise Projects 980,498                1,022,804             750,000                1,333,000             1,333,000             5,419,302            
Infrastructure and Transportation improvements (including investment in
bridges, reservoirs, flood risk mitigation and road safety improvements)
8,858,586             14,002,522           5,890,378             6,114,358             6,446,501             41,312,345          
Sub-Total Place 24,888,297           31,901,253           22,697,192           80,575,983           27,315,740           187,378,465        
Project / Theme
Page 427 of 454

Page 428

Strategic Capital Investment Programme 2024/25 - 2028/29 - Detailed Service Profile Appendix 1
Year 1 Year 2 Year 3 Year 4 Year 5 Total
2024/25 2025/26 2026/27 2027/28 2028/29
£ £ £ £ £ £
Housing and Communities
Community Board Project Investment Fund 1,789,202             2,251,070             4,516,971             2,850,000             3,070,000             14,477,243          
Sub-Total Housing Management and Communities 1,789,202             2,251,070             4,516,971             2,850,000             3,070,000             14,477,243          
Total Enterprise and Communities 113,407,243         174,927,111         142,368,156         170,951,660         236,506,834         838,161,004        
Adult Social Care
Equipment and Adaptations 2,006,851             2,364,472             1,994,077             2,302,962             2,302,961             10,971,323          
Total Adult Social Care 2,006,851             2,364,472             1,994,077             2,302,962             2,302,961             10,971,323          
Chief Executives (Finance & Technology)
Line of Business (LOB) System Portfolio 359,178                1,819,326             5,765,014             2,971,250             1,886,125                         12,800,893
End User Device (EUD) Refresh 1,614,280             845,656                729,319                1,042,098             965,760                             5,197,113
Digitisation & Innovation 1,661,730             2,001,061             974,000                315,140                205,000                             5,156,931
Total Finance & Technology 3,635,188             4,666,043             7,468,333             4,328,488             3,056,885             23,154,937          
Corporate Contingency
Contingency -                       -                       -                       -                       8,654,566             8,654,566            
Sub-Total Contingency -                       -                       -                       -                       8,654,566             8,654,566            
Trend Based Adjustment (10%) (15,183,057) 15,183,057 0
TOTAL GENERAL SERVICES CAPITAL PROGRAMME 119,049,282        181,957,626        136,647,509        177,583,110        265,704,303        880,941,830       
HRA Mainstream Investment 59,351,000           83,730,000           87,923,000           101,512,000         106,340,000                   438,856,000
HRA New Supply Investment (Indicative) 44,487,000           53,916,000           86,612,000           70,263,000           83,452,000                     338,730,000
TOTAL HRA CAPITAL INVESTMENT (INDICATIVE) 103,838,000        137,646,000        174,535,000        171,775,000        189,792,000        777,586,000       
TOTAL COMMUNITY INVESTMENT 222,887,282        319,603,626        311,182,509        349,358,110        455,496,303        1,658,527,830    
Project / Theme
Page 428 of 454

Page 429

Appendix 2
STRATEGIC CAPITAL DELIVERY GROUP                    
TERMS OF REFERENCE & GOVERNANCE FRAMEWORK 
1. ROLE
The Strategic Capital Delivery Group (the Group) is a working group convened of senior
officers.  The Group advises elected members in terms of capital allocation and project
approval and has responsibility for the strategic management of the capital
programmes, including the realignment of resources to facilitate the effective delivery
of the Council’s Strategic Capital Investment Programme, including: 
• General Services Core Investment Programme (including Town and
Community Hub delivery)
• HRA Mainstream Investment Programme
• HRA New Supply Programme
The Group makes recommendations on and amendments to the approved capital
programmes, as required, with any amendments reported to Committees in line with
the financial regulations and the agreed limits, as outlined in the Terms of Reference &
Strategic Framework. 
1.1  Chair
The Depute Chief Executive will act as Chair of the Group, with the Chief Officer
(Finance & Technology) as Depute. 
1.2 Group objectives
• Monitor the Council’s Strategic Capital Investment Programme, including
performance against delivery aims and objectives; 
• Advise Elected Members on capital allocations and project approval,
making recommendations on and amendments to the approved capital
programme;
• Ensure the proper alignment of capital resources to allow for effective
delivery of the programmes;
• Monitor expenditure projections against budgets and available resources,
revising these where necessary, subject to the limits set out in Section 4
– Authority;
• Ensure robust governance arrangements around the delivery, monitoring
and reporting of capital programmes;
• Monitor outputs and outcomes delivered by capital programmes against
planned outputs and outcomes with services to report exceptions and
remedial actions to the Group;
• Consider the quarterly capital monitoring report to Finance and Resources
Committee to ensure appropriate actions are agreed for review by Elected
Members;
• Ensure Participatory Budgeting principles are embedded in key capital
investment decisions of the Council;
Page 429 of 454

Page 430

• Arrange and undertake training/awareness sessions as required to
reinforce skills/knowledge across the Council in respect of capital
monitoring and capital financing;
• Ensure all decisions made by the Group are Intra Vires and in line with
The Plan for North Lanarkshire.
2. MEMBERSHIP 
2.1  Membership
Membership to include:
Depute Chief Executive (Chair)
Chief Officer (Finance and Technology) 
Chief Officer (Assets and Procurement)
Chief Officer (Place)
Chief Officer (Housing and Communities) 
Chief Officer (Education)
Chief Officer (Community Operations)
Chief Officer (Planning, Performance and Quality Assurance)
Business Finance Manager (Resources Solutions)
Membership of the Group reflects the composition of the capital programmes and
ensures the fair representation of Council services responsible for investment in all
Council assets. Substitutes in the event of a core member’s unavailability are
acceptable but must be from the SCDG maintained list of agreed substitute officers. 
The Finance Manager (Treasury, Capital and Controls) and Finance Manager (Assets
& Procurement and Community Operations) will attend as key advisors to the Group. 
The Group must make decisions on a corporate basis, in line with The Plan for North
Lanarkshire, Financial Strategy, Financial Regulations and other relevant plans and
policies. 
In the event that the Council structure changes the membership will be aligned to the
new structure, unless membership is formally changed by the Policy and Strategy
Committee.   
2.2  Attendance
Where group members are unable to attend meetings, nominated deputies should
attend. Group membership should be representative of the Council services, with
members acting in an independent manner.
Quorum is achieved with 70% attendance (including substitutes). In the event that a
meeting is not quorate, the Group is required to reconvene.
Officers and external parties may be invited to attend meetings of the Group to provide
information/ support and to answer questions in respect of the Council’s capital
programmes. 
3. PROCEDURES
3.1  Meeting Frequency
The Group will meet, as a minimum, quarterly, prior to each cycle of Policy and Strategy
Committee.   
Page 430 of 454

Page 431

3.2  Administration
Administrative support will be arranged by the Chair to coordinate and distribute
agendas, minutes and meeting papers.  Records of all minutes, decisions and actions
will be maintained.
3.3  Submissions and Reports
Group members may make submissions to the Group. Submissions and progress
reports should reach the nominated administrative support no later than five working
days before each meeting.
Urgent matters may be submitted later than this deadline, but only with the approval of
the Chair.
3.4  Agendas and Papers
Agendas will be prepared and distributed to Group members with supporting papers at
least three working days before each meeting. 
3.5  Minutes
Minutes will be taken of meetings and will be distributed in draft via email within five
working days of the Group meeting. Minutes will be approved by the Group at the
following meeting.
3.6  Responsibility for Actions and Communication
Group members shall ensure that any decisions relevant to their Service are actioned
by relevant officers. Responsibility for actions within minutes will be recorded in an
updated work plan as per the outcome of the meeting.
The Depute Chief Executive and Chief Officers shall refer Group decisions to individual
Service Committees for approval or noting, in accordance with agreed limits outlined in
Section 4 – Approvals below, and will advise the Group of outcomes and decisions
made by Committee.
3.7  Special Meetings
Special meetings of the Group may be called at the discretion of the Chair.  As far as
possible, normal procedures will be followed. 
4. AUTHORITY
4.1 Resources
The Capital Programmes are based on estimates of future investment targets funded
by a combination of Scottish Government Grants, capital receipts, CFCR and
prudential borrowing, including Community Investment Fund. When confirmation of
investment targets are reviewed or amendments to resources are known, the Group
will give consideration to adjusting the Programme accordingly. Recommendations for
a revised programme, based on the actual level of resources will subsequently be
referred to Policy and Strategy Committee for approval annually.
4.2 Virement & Re-profiling
4.2.1 General Fund Capital Programme
In the event the Group agrees a virement between approved Project / Thematic
Categories, this will be up to a maximum of £500,000.  Virements above this value
require the approval of the Individual Service Committee (if they remain within Service-
headings), or the Finance and Resources Committee if the virement is across Services.   
Page 431 of 454

Page 432

4.2.2 Housing Capital Programmes 
The Group has the authority to redirect resources across the following Thematic
Categories. These virements should be reported to the Housing Committee:
• Estate Regeneration
• Energy Efficiency
• Major Repairs
• Internal Upgrading
• Tower Strategy
• Community Care
• Fees/Miscellaneous
• New Build
• Council Buy Back Schemes 
The Group has the authority to agree virements up to £1,000,000, virements in excess
of this amount will be reported to the Finance and Resources Committee for noting. 
Virements above this value require the approval of the Housing Committee.
4.3  Re-profiling of Capital Allocations
The Group has authority to re-profile capital allocations within Project / Thematic
Categories up to a maximum of £10,000,000 to and from future years of the Programme
to ensure effective delivery over the 5 year timeframe, provided this can be managed
within the overall annual budgeted resources (i.e. does not create additional
unbudgeted borrowing costs). This will be reported to appropriate Service Committees,
and Finance and Resources Committee for noting.
4.4  Emerging Priorities Protocol
In the event that an unfunded burden is identified, reference should be made to the
agreed Emerging Priorities Protocol as detailed at Appendix 1.
Emergency works outwith the approved Programme should be referred to the Chair
who will consult with the Chief Officer (Finance and Technology) in seeking approval
to proceed and this decision then reported to the Group at the next scheduled meeting. 
4.5 Corporate Capital Contingency
Where the emerging priorities protocol is unable to resolve the funding issues arising,
or where there is an emergency, a request for the use of the corporate contingency can
be made.  Appendix 2 sets out the requirements for accessing the fund.  
4.6 Monitoring
Individual Service Committee reports will provide monitoring information showing the
appropriate level of detail, predominately in line with the project / theme groupings as
laid out within the agreed Strategic Capital Investment Programme or alternatively in
accordance with the appropriate project groupings within the Housing Capital
Programme.
Whilst individual budget holders have responsibility for reporting variances and
ensuring compliance with Financial Regulations and General Contract Standing
Orders, overall responsibility for financial management lies with the Chief Officer
(Finance and Technology). Therefore, Finance staff must be provided with information
for individual projects to allow for effective financial monitoring.
In addition to financial information, services are expected to monitor achievement of
programme and project outputs and outcomes. The Strategic Capital Delivery Group
will monitor the delivery of these outputs and outcomes on a regular basis culminating
in the production of an annual capital delivery report for consideration by the group.
Page 432 of 454

Page 433

Significant deviation from expected plans will be reported to the group in accordance
with the agreed Programme Delivery Dashboard. 
4.7 Sub Groups
To ensure specific management of resources to advance the Plan for North
Lanarkshire and Programme of Work objectives, the Group will establish and delegate
authority to either sub-groups or other governance groups (i.e. Projects Boards), as
considered necessary, including through the Programme of Work Programme Boards. 
The sub-groups will have Terms of Reference and Governance Framework established
which shall include the requirement to report back to the SCDG. 
The following is an example of the governance groups created with delegated authority
from the Group to manage project delivery, including allocating resources:
• Economic Regeneration Delivery Programme (ERDP) Steering Group
Delegated responsibility for managing the ERDP capital programme including
town centre regeneration and external funding streams such as Vacant and
Derelict Land Fund, Town Centre Fund, Place Based Investment Programme
and other capital funds supporting economic regeneration. 
• Town and Community Hub Programme Steering Group
Delegated responsibility for managing Town and Community Hub programme
delivery including assessment of external funding opportunities from the
Scottish Government’s Learning Estate Investment Programme. 
• City Deal and Ravenscraig Steering Group
Delegated responsibility for managing the Council’s City Deal programme
including supporting wider City Region objectives. 
5. POST PROJECT REVIEWS
The Group has oversight of the performance of the Council’s Capital Programmes and
may carry out post implementation reviews, in line with the Council’s Project
Management guidelines.
6. RISK MANAGEMENT
All risks relating to the Programme and to individual projects will be managed in line
with the Council’s Risk Management Strategy and in accordance with Project
Management guidelines. 
Page 433 of 454

Page 434

Appendix 1
Emerging Priorities Protocol 
The strategic capital investment programme will inevitably face ongoing demands for scarce
resources. These unfunded burdens can happen for a variety of reasons but would normally
be linked to the changing scope of already approved projects, the impact of market conditions
on the cost of delivering projects or the identification of new projects. 
This protocol seeks to provide a pathway for services to consider their response to these
emerging priorities to ensure there is a consistency in approach across all service areas. 
Where a service identifies an unfunded burden the following process must be followed (see
recording template in Appendix A): 
1. Services should assess the emerging priority against the other priorities within their capital
investment programme. This should include consideration of the relative risk profile created
by the emerging priority and its contribution to the Plan for North Lanarkshire compared to
deprioritisation of existing spending plans. 
To support this assessment of risk and contribution to the Plan for North Lanarkshire,
reference should be made to the original capital bid template and the original scoring matrix
for the current capital programme as agreed by SCDG. Both of these factors can be found
on the SCDG Teams site (links to be inserted). The risk impact section was detailed as
follows: 
Risk Impact
Audit Scotland guidance expects effective capital programme management to have robust
risk management arrangements in place. This section will support the evaluation of each
project and the contribution it makes to the Council’s overall risk management framework.   
Which corporate or service
risks will the project help to
mitigate? 
What risks are inherent in
the project? 
What are the risks of not
undertaking the project? 
How will the project’s risks
be managed? 
2. In the event that the emerging issue is of a higher priority than existing spending plans,
Chief Officers should consider their current five-year allocation to identify scope to realign
resources by:
a. Removing projects from their programme to fund the emerging burden,
Page 434 of 454

Page 435

b. Rephasing projects across the five-year programme, or
c. Rephasing projects outwith the five-year programme. 
3. In the event that the emerging issue cannot be resolved within the Chief Officer’s own remit
area, consideration should be given to whether points a. to c. above can be managed within
the wider service capital programme in conjunction with the Depute Chief Executive. 
4. The outcome of 2. or 3. above may result in the requirement for a virement or reprofiling
request which will be considered in line with the SCDG’s Terms of Reference. 
5. Where no suitable funding source is identified via steps 1 to 3 above, the Chief Officer
should evidence the outcome of their prioritisation assessment in the form of a briefing note
to SCDG highlighting the process undertaken and the outcome determined. 
6. Thereafter, Chief Officers will be required to complete a Capital Bid Template for the
emerging project (see Appendix B). This will ensure the emerging project can be assessed
against the same scoring criteria and resourcing methodology deployed when assessing
the current Strategic Capital Investment Programme 2024/25 to 2028/29 as approved at
Policy and Strategy Committee in March 2024 (see Appendix C). 
7. Following receipt of the appropriate Capital Bid Template, SCDG will convene an
appropriate evaluation group to score the emerging project. This evaluation group will
include the Depute Chief Executive and Chief Officer (Finance) to ensure a degree of
consistency with the original scoring. A further Chief Officer will be agreed by SCDG as
appropriate and cannot be the Chief Officer submitting the additional project for scrutiny.   
8. After scoring, the project will be assessed against the original scoring outcome for the
2024/25 to 2028/29 capital programme. In the event that the project scores below the
threshold for funding, no funding can be allocated to the project. Where the project scores
above the threshold for funding, those projects with a lower evaluated score will have any
uncommitted funding removed to ensure the emerging project can be funded ((subject to
appropriate virement approvals). For reference, the lowest scoring projects from the
2024/25 to 2028/29 evaluation process are shown in Appendix D. 
Page 435 of 454

Page 436

Appendix A
Emerging Priorities Protocol – Decision Recording Template
Stage Action Required Service Assessment
1. Services should assess the emerging priority against the other
priorities within their capital investment programme. This should
include consideration of the relative risk profile created by the
emerging priority and its contribution to the Plan for North
Lanarkshire compared to deprioritisation of existing spending
plans. 
To support this assessment of risk and contribution to the Plan for
North Lanarkshire, reference should be made to the original capital
bid template and the original scoring matrix for the current capital
programme as agreed by SCDG 
Please include details of assessment of relative risk profile
here, including linking to the contribution to the Plan for North
Lanarkshire. 
2. In the event that the emerging issue is of a higher priority than
existing spending plans, Chief Officers should consider their
current five-year allocation to identify scope to realign resources
by:
a. Removing projects from their programme to fund the emerging
burden,
b. Rephasing projects across the five-year programme, or
c. Rephasing projects outwith the five-year programme. 
Please include details of the assessment undertaken on the
potential for allocating resources from the existing capital
programme i.e. which projects should be removed or
rephased. 
3. In the event that the emerging issue cannot be resolved within
the Chief Officer’s own remit area, consideration should be given
to whether points a. to c. above can be managed within the wider
service capital programme in conjunction with the Depute Chief
Executive. 
This may lead to a requirement for a virement or reprofiling
request in line with the SCDG’s Terms of Reference. 
Please include details of the assessment undertaken on the
potential for allocating resources from the wider service capital
programme i.e. which projects should be removed or
rephased.
Only in the event that these three options have been exhausted for funding an emerging priority should a request for additional
funding be made to the Strategic Capital Delivery Group. Any such request will require satisfactory completion of this template and
the capital bid template before SCDG will consider further.  Page 436 of 454

Page 437

Appendix B
North Lanarkshire Council
Strategic Capital Investment Programme 2024/25 to 2028/29
Capital Bid Template 
Prepared By: Date: Version   
Project Title/Theme:  Project Ref: 
Service / Division: 
Estimated Cost / Project Bid: 
1. Objectives
Please provide a brief outline of the high level aims and objectives of the project /
programme? 
How should the project be classified (check box)? 
• Unavoidable Commitment (legally committed or committee approved only) ☐
• Asset Management Plan requirement ☐
• New Investment to support the Programme of Work to 2028  ☐ 
Rationale for classification:
Unavoidable Commitment
(Details of legally committed contracts,
projects that have already commenced,
committee approved etc)   
Asset Management Plan requirement
(Provide details of links to corporate or
service asset management plans etc and
statutory basis for the project)   
New investment
(Highlight the relevant Programme of Work
themes) 
Page 437 of 454

Page 438

2. Financial Summary 
Timescales:
Estimated Start Date 
Estimated Completion Date 
Bid Profile
Year 1
(24/25)
£000
Year 2
(25/26)
£000
Year 3
(26/27)
£000
Year 4
(27/28)
£000
Year 5
(28/29)
£000
Total 
£000
Estimated
NLC Capital
Investment
requirement      
Estimated
External
Match
Funding      
Total       
Please indicate if there’s an expectation that the project will span beyond the current 5-year
capital planning cycle: 
Bid Profile
Year 6
(29/30)
£000
Year 7
(30/31)
£000
Year 8
(31/32)
£000
Year 9
(32/33)
£000
Year 10
(33/34)
£000
Total 
£000
Estimated
NLC Capital
Investment
requirement       
Revenue implications associated with capital investment
Please outline any one-off or recurring revenue implications associated with proposed capital
investment. Where possible quantify the impact and how your service proposes to fund any
additional costs: 
Description of Impact Value
(£000)
Savings
(i.e. reduced energy
consumption, income
generation)   
Costs
(i.e. additional
unbudgeted
maintenance costs,
increased staffing
costs from creation of
new facility)  
Page 438 of 454

Page 439

3. Key Deliverables 
Financial
Year
Targeted outputs for each financial
year
(i.e. number of window replacement
projects; number of town centre sites
regenerated; EUD refresh of estate
etc)
Outcomes planned / anticipated for
each financial year
(i.e. impact of projects on overall
condition of the school estate;
improved occupancy of town centre
sites / increased footfall; improved
system and network performance /
improved business continuity etc)
2024/25   
2025/26  
2026/27  
2027/28  
2028/29   
Monitoring and evaluation: 
How will you demonstrate that the objectives, outputs and outcomes outlined above have
been achieved / delivered? 
Page 439 of 454

Page 440

4. Risk Impact
Audit Scotland guidance expects effective capital programme management to have robust risk
management arrangements in place. This section will support the evaluation of each project and
the contribution it makes to the Council’s overall risk management framework.   
Which corporate or service
risks will the project help to
mitigate? 
What risks are inherent in
the project? 
What are the risks of not
undertaking the project? 
How will the project’s risks
be managed? 
Page 440 of 454

Page 441

5. Programme of Work to 2028
This section will support the assessment of New Investment proposals in support of the Council’s
Programme of Work to 2028 Programme of Work to 2028. 
Programme of Work Contribution the project / programme would make to the
Programme of Work 
(Please provide an idea of the scale of impact on PoW ‘Initial
Actions’, ‘Health Check Indicators’ and ‘What will be
achieved’
Transforming Places 
Invest In North
Lanarkshire 
Sustainable Futures 
Resilient People 
Brighter Futures 
Digital NL 
One Service 
Page 441 of 454

Page 442

6. Public Sector Equality Duty and Fairer Scotland Duty
Where the project / programme has an impact as a result of the Public Sector Equality Duty and /
or Fairer Scotland Duty please provide a brief summary: 
PSED and FSD Impact 
Where there is an impact services should ensure that an assessment has been carried out and
published in accordance with the Council’s guidance. 
7. Additional information
Please provide any additional information that may be relevant. 
Additional information 
Page 442 of 454

Page 443

Appendix C
Scoring and Resource Allocation Methodology
Following the submission of capital bids from Services, SCDG members are responsible for scoring the
bids. The overriding principle is to ensure that the capital investment plans align closely to the priorities
of the Council, with each bid assessed as to how it helps advance these aims. This process also
recognises the limits to funding levels available to support the capital investment plans.
Unavoidable commitments relating to projects that have commenced or have been committed by
Committee decision but are not fully funded within the current capital programme and/or are of strategic
importance should be top sliced from the available resources. This also includes an assessment of
those projects or elements of projects that must be completed to reduce the risk of service failures on
areas such as key digital infrastructure, key bridge infrastructure etc
Thereafter capital bids are assessed and prioritised using a weighted scoring model. The key factors
and associated weightings are highlighted in the following table: 
Criteria Score
(%)
1. Statutory requirement  20
2. Manages the Council’s risks 20
3. Revenue consequences 
(high score for delivering savings, low score for increasing cost base)
15
4. Deliverability 15
5. Impact on carbon management 10
6. Contribution to Programme of Work 20
Total 100
Members of SCDG are asked to score each bid against these criteria on a range of 0 to 5, with 0
highlighting no contribution / impact and 5 highlighting maximum contribution / impact. 
The individual scores are then combined to provide a consolidated score. This consolidated score is
converted into a percentage which then allows all projects to be ranked in priority order. 
Those projects with the highest weighted score are allocated the highest percentage of their overall bid
value and conversely if projects scored below the threshold no funding is allocated.
Finally, a programme moderation may take place to assess any significant outliers from the previous
funding allocations i.e. where funding allocations are significantly reduced or significantly increased.
In addition, the final moderation programme may consider whether the funding allocation model would
create any situations where the funding available would result in a ‘do not proceed’ dilemma and
whether that outcome has any significant impacts on the Council’s key ambitions. 
Page 443 of 454

Page 444

Appendix D 
Lowest Scoring Bids from Strategic Capital Investment Programme 2024/25 to 2028/29 
Service Area Theme Project Name Allocation
(£)
Percentage
Score
Assets and Procurement  Maintaining
Existing Assets
DDA Improvement Works 115,000 55%
Business and Digital LOB Financial Systems Transformation 340,000 55%
Assets and Procurement Maintaining
Existing Assets
Ground Structural Works 500,000 54%
Assets and Procurement Maintaining
Existing Assets
Community Facilities Condition
Survey works
360,000 54%
Assets and Procurement Maintaining
Existing Assets
Condition Survey 82,000 54%
Business and Digital LOB ServiceNow ITSM remediation  10,000 53%
Assets and Procurement Maintaining
Existing Assets
Swimming Pools 360,000 53%
Place Infrastructure &
Transportation
Improvements
Parking Infrastructure 250,000 53%
Community Operations Capitalised
Equipment
Cemeteries and Parks Capitalised
Equipment
100,000 52%
Assets and Procurement Outdoor Education
and Outdoor
Spaces
3G Carpet replacement for end of
life education pitches
480,000 52%
Assets and Procurement Maintaining
Existing Assets
Major Maintenance 571,000 52%
Business and Digital LOB HRSD  150,000 52%
Assets and Procurement Maintaining
Existing Assets
General 445,570 52%
Community Operations Parks and Open
Spaces
Infrastructure - Parks and Open
Spaces
250,000 51%
Business and Digital LOB Committee Minutes System
Renewal
15,000 51%
Assets and Procurement Maintaining
Existing Assets
Renewal of Catering Equipment 85,000 51%
Community Operations Parks and Open
Spaces
Capitalised Equipment - Parks and
Open Spaces
844,740 51%
Assets and Procurement Maintaining
Existing Assets
Condition survey 165,340 51%
Assets and Procurement Maintaining
Existing Assets
Janitorial Equipment 52,500 50%
Community Operations Depot
Developments
New Depot - Wardpark 500,000 50%
Assets and Procurement Maintaining
Existing Assets
Renewal of Building Cleaning
Equipment
42,500 50%
Assets and Procurement Leisure Service
Development
General 97,675 50%
Business and Digital LOB Itrent 200,000 50%
Total   6,016,325 
Note: the Service reflects the structures when the capital bids were submitted and may not now be
reflective of current service configuration e.g. building cleaning equipment will now be aligned to
Community Operations rather than Assets and Procurement. 
Page 444 of 454

Page 445

Appendix 2
Corporate Capital Contingency
The five year Capital programme has an inbuilt contingency to allow for unforeseen circumstances. 
This guidance sets out the requirements for accessing the contingency fund.  
Eligibility  
In the first instance all emerging issues should be considered under the SCDG Emerging Priorities
Protocol however, instances where the Contingency Fund may be drawn down on should satisfy the
following:
• Entirely unexpected with an immediate risk to operations, safety, or legal compliance; 
OR
• Inaction would result in significant financial, reputational, or operational failure: 
AND
• No alternative funding available within existing capital budgets.
Approval and Reporting
Draws on the contingency must be authorised by the Strategic Capital Delivery Group on the
recommendation of the Section 95 Officer except in an emergency situation when a draw down may be
authorised by the Depute Chief Executive and the Chief Officer (Finance and Technology) as chair and
vice chair of the SCDG.  Full details must be reported to the SCDG and Finance and Resources
Committee thereafter.  
Documentation and Justification
Any use of the contingency fund must be fully documented and justified.  The following are required to
be provided when requesting authorisation of use of the fund.
• Why capital funding is required
• In the event of an emergency issue, identification of actions required 
• Full breakdown of costs
• Potential impact i.e. on operations, compliance, service delivery, safety etc.
• Actions already taken
Monitoring
The Service utilising the contingency should continue to report to the SCDG on the status of the project
providing an up to date account of action taken and the costs incurred against the original request in
line with normal reporting processes.  Any significant deviations from the initial request must be fully
justified.  Any adverse movements of £100,000 or over are subject to further approval from the group.   
Page 445 of 454

Page 446

Page 446 of 454

Page 447

North Lanarkshire Council
Report
Policy and Strategy Committee 
Does this report require to be approved? ☒ Yes ☐ No
Ref: CC/BF Date: 19 March 2026 
Contract Award for Postal Services 
From  Carolynne Coole, Interim Chief Officer (Strategy and Engagement) 
E-mail coolemillerc@northlan.gov.uk Telephone: 07583 036009 
Executive Summary 
The council requires provision of a variety of postal services on an ongoing basis to meet its statutory
obligations across a range of service areas. Postal services require to be continuously available to
the council with no delay or break. 
The council’s current contracts for postal services are in place until 30 June 2026, however the
national collaborative framework used previously expired in June 2025 and was not replaced. 
Alternative procurement options were considered to create subsequent contracts, however Scotland
Excel now plan to tender the postal requirements for several local authorities in an aggregation
exercise and has invited the council to join. While it is anticipated that Scotland Excel’s approach will
achieve the best value for the council over a longer term, the contract is not yet available until later
in 2026. 
To provide time for Scotland Excel to finalise its procurement and allow the council a future option
to join that contract (subject to approval of a future committee), the committee is asked to approve
the award of interim contracts to our incumbent suppliers, Royal Mail Group Limited and Critiqom
Limited. 
The interim contracts proposed are for the period 1 July 2026 to 31 December 2026, with the option
to extend until 30 June 2027. Based on previous usage and forecasting demand the council’s
anticipated aggregate spend across these contracts, (for up to 12 months), would be £1,525,000
exclusive of VAT. The procurement route of the interim contracts would be direct awards made from
the Crown Commercial Services Postal Services Framework (“CCS Framework”). 
Recommendations 
It is recommended that the Policy and Strategy Committee: 
(1) Approve interim contract awards, for a period up to 12 months, to: 
• Royal Mail Group Limited for Physical Mail, contract value £325,000, exclusive of VAT;
and, 
• Critiqom Limited for Hybrid and Scheduled Mail, contract value £1,200,000 exclusive of
VAT. 
(2) Endorse the council’s participation in Scotland Excel’s upcoming aggregated procurement. 
Item 17
Page 447 of 454

Page 448

The Plan for North Lanarkshire 
Priority Improve North Lanarkshire's resource base
Ambition Statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement 
1. Background 
1.1. The council requires provision of a variety of postal services on an ongoing basis to meet its
statutory obligations across a range of service areas. Postal services require to be
continuously available to the council with no delay or break. 
1.2. Committee approved the below contracts in June 2023: 
• Royal Mail Group Limited for Physical mail services, for the period 1 January 2024 to 30
June 26.
• Critiqom Limited for Hybrid, Scheduled Bulk/Planned for the period 1 January 24 to 30
June 26. 
1.3. The contracts were procured as on a direct award basis from Scotland’s National
Collaborative Framework for Postal Services (“National Framework”). 
1.4. The National Framework expired in June 2025. Public bodies were notified that the National
Framework was not being replaced but were referred to the Crown Commercial Services
Postal Services Framework (“CCS Framework”) as an alternative procurement route. 
2. Report 
2.1 An internal project team has been reviewing alternative procurement routes and options to
arrange new contracts to commence from 1 July 2026, to dovetail with the current contracts
ending. 
2.2 An option that could have been considered was for the council to undertake an open tender
on its own, however it is more beneficial to use an established framework from which the
market has already been tested, where the contractors have been evaluated and agreed to
service specific terms and conditions, and standard pricing / rate cards with each contractor
are set. 
2.3 The CCS Framework for postal services is immediately available to all UK public bodies and
has been live from 3 October 2023 and is in place until 2 October 2027. It is a multi-lot and
multi-contractor framework from which the council can source all its postal requirements, and
our incumbent contractors are both on this framework. 
2.4 With the National Framework not being renewed, Scotland Excel recently stepped in with a
solution, planning to aggregate the postal requirements for multiple local authorities and then
undertake a mini competition using the CCS Framework. Scotland Excel is keen for the
council to participate in its exercise to boost the volumes in competition and secure the best
possible discounted rates. The timelines for Scotland Excel’s procurement however are not
finalised and its contract is not expected be ready for the council to use when its current
contracts end on 30 June 2026. 
2.5 The council can still participate with Scotland Excel, but to allow continuity of service, it
requires the council to put in place an interim contract arrangement now. Once the Scotland
Page 448 of 454

Page 449

Excel contract is ready, a report can be brought to a future committee to provide details and
seek approval to use. 
2.6 A number of options have been considered including: 
2.6.1 Option 1 Open Tender – this would be open to any contractor to compete for our requirements
and would allow us to establish the contracts using our own terms and conditions. These
tenders would be evaluated using the most economically advantageous scoring model. If a
new contractor was the successful tenderer, this would require some time to mobilise.
Competition could be negatively impacted, as the key contractors in the marketplace have
already tendered to join the CCS Framework and may not participate as it would incur further
bid costs. 
2.6.2 Option 2 Direct Award – this would allow the council to maintain continuity by contracting to
our incumbent contractors without incurring up front switching costs i.e. changing contractor
for Hybrid mail services would require changing system and retraining staff. A contract made
by Direct Award from the CCS Framework must be based on the rate cards, there is no option
to negotiate discounts. 
2.6.3 Option 3 Mini Competition – this would seek tenders from all CCS Framework contractors
and seek discounts on their rate cards. These tenders would be evaluated using the most
economically advantageous scoring model, for which switching costs can be built into the
price evaluation. If a new contractor was the successful tenderer, this would require some
time to mobilise the contract. 
2.6.4 Option 4 Scotland Excel Mini Competition – participate with Scotland Excel, who will fully
manage a Mini Competition from the CCS Framework inclusive of the council’s requirements
and volumes. Under this option, it would be necessary for the council to make short term
arrangements to provide continuity of service until the Scotland Excel contract is finalised. 
Conclusion / Recommendation 
2.7 Over a longer term, Scotland Excel’s Mini Competition would provide the best value for the
council based on the larger volumes and economies of scale savings. Until more details of
that contract are known, the council must have certainty and therefore secure its own contract
to commence 1 July 2026. 
2.8 Using Option 2, a Direct Award, committee is asked to approve interim contract awards to
our incumbent contractors: 
• Royal Mail Group Limited for Physical Mail; and
• Critiqom Limited for Hybrid and Scheduled Mail. 
2.9 These interim contracts would be for the period 1 July 2026 to 31 December 2026, with the
option to extend until 30 June 2027, should the Scotland Excel procurement not be ready to
implement. 
2.10 Based on previous usage and forecasting demand of the council’s anticipated aggregate
spend across these contracts (for up to 12 months), are as follows: 
• Royal Mail Group Limited for Physical Mail, contract value £325,000, exclusive of VAT;
and,
• Critiqom Limited for Hybrid and Scheduled Mail, contract value £1,200,000 exclusive of
VAT. 
Page 449 of 454

Page 450

2.11 Officers from Strategy and Engagement will be responsible for managing the Agreement
which will be undertaken in accordance with the contract and supplier management
conditions applied within the Agreement. 
3 Measures of success 
3.1 Appointment of contractors who have the experience and capability to deliver robust postal
services which meet the council’s needs. 
3.2 Procurement procedure that is compliant with the procurement legislation and internal
procedures. 
3.3 Best value that is both demonstrable and achieved. 
4 Supporting documents 
4.1 Appendix 1 Summary of Procurement Procedure 
Carolynne Coole
Interim Chief Officer (Strategy and Engagement)  
Page 450 of 454

Page 451

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Estimated costs are based on historic usage. Actual spend will be dependent on the
usage of postal services which is determined by the requirements of the business activity
across all Service Areas.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒  
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?  
Yes ☐ No ☒  
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data? 
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☒ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☒ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? Page 451 of 454

Page 452

Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☒ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The contractors have submitted a carbon reduction plan as part of their appointment to
the framework; this helps customers understand the impact of their operations on the
environment.
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from the
United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out? 
Yes ☐ No ☐  
Page 452 of 454

Page 453

Appendix 1 – Summary of Procurement Procedure 
Contracts
Reference NLC-CPT-25-112 NLC-CPT-25-113
Title Provision of Postal Services
• Physical Mail
Provision of Postal Services
• Planned/Hybrid Mail
Classification Services Services
Competition
Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on Third Party Frameworks
Procurement Route Call-off following Direct Award using a Third Party Framework (Multi Contractor Framework)
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments
By utilising a Direct Award, it allows the council to directly engage and contract with appointed framework
contractors who have already went through a full competitive procurement procedure where the contractors
have been evaluated and agreed to service specific terms and conditions and set their rates.
The contract awards are proposed to the council’s incumbent contractors, which ensures there are no
switching costs for the council, and it provides continuity without any break in service.
Award
Details
Value £325,000 £1,200,000
Contract Duration 6 months, option to extend by 6 months (6 + 6) 6 months, option to extend by 6 months (6 + 6)
Contractor Name Royal Mail Group Limited Critiqom Limited (Trading as Mail Metrics)
Contractor Size Large Large
Contractor Location London Bellshill
Payment of Living Wage? Yes Yes
Living Wage Accredited? No Yes 
Page 453 of 454

Page 454

Page 454 of 454