Democracy Spraffa

Compulsory Purchase Order - 99 Stanhope Place, Gowkthrapple, Wishaw

North Lanarkshire Council · 10 November 2022
Back to Planning Committee — 10 November 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

North Lanarkshire Council
Report
Planning Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref:21/00982/PPP  Date:  10/11/22 
Compulsory Purchase Order
99 Stanhope Place, Gowkthrapple
Town & Country Planning (Scotland) Act 1997 
From:  Pamela Humphries, Head of Planning and Regeneration  
E-mail: LiddellG@northlan.gov.uk  Telephone: 07929 773565 
Executive Summary 
The purpose of this report is to seek approval to promote a Compulsory Purchase Order
(CPO) in relation to a property at 99 Stanhope Place, Wishaw (“the Property”).  The
Property is identified in the location plan and CPO plan in Annex 2 and 5 and is part of
the approved Gowkthrapple Regeneration Masterplan Framework (“the Masterplan”) for
major regeneration at Gowkthrapple (See Location Plan – Masterplan Site Boundary and
Indicative Concept Masterplan Drawing at Annex 1 and 3). The regeneration plans
outline significant redevelopment of the area following demolition of the existing flats and
will deliver new housing, landscaped open space and green corridors in four phases (as
shown on the Masterplan Framework Phasing plan attached at Annex 3). The Property is
situated within Phase 2 (as shown in Masterplan Framework Phasing at Annex 4). 
Planning application ref. 21/00982/PPP (described as “Residential development,
ancillary retail, open space, landscaping, SUDS, access, associated works and
demolition (in principle)” was submitted by North Lanarkshire Council for the
redevelopment of Gowkthrapple and this application was approved by the Planning
Committee at its meeting of 27th January 2022.  The permission is to facilitate the
redevelopment as noted, comprising a Masterplan for an area up to and including
Stanhope Place, but also involving the demolition of existing tower blocks and low-rise
flats.   
It has not been possible to reach final agreement with one private owner to purchase
their flat on a voluntary basis.  This is required to allow part of the redevelopment to be
implemented and the wider aims of the Masterplan achieved. 
Planning legislation allows Local Authorities to exercise powers relating to the
compulsory acquisition of land for development and other planning purposes under
certain circumstances.  Those powers apply in this instance and the following report is to
seek Committee’s agreement to promote a CPO.

Page 2

1. Background 
1.1 In 2017, the Council announced a strategic change in housing policy following
consultation with the residents of North Lanarkshire to agree on plans to demolish
a number of towers and low-rise blocks and replace them with modern homes fit for
the future. Reports were presented to and agreed by the then Housing and Social
Work Services Committee on 2nd February 2017 on a Tower Strategy Action Plan
and subsequently to the Enterprise and Housing Committee on 15th February 2018
on the Future Tower Strategy. These approved reports consolidated the strategy of
moving away from flatted high and low rise properties with a future focus on
provision of two storey homes. This strategic aim allowed the strategy for
demolition of the existing towers at Gowkthrapple to be progressed. 
1.2 A report was presented to and approved by the Enterprise and Housing Committee
on 10th May 2018 updating members on the Economic Regeneration Delivery
Plan.  This also approved proposals to progress the initial phase of the Council’s
housing re-provisioning programme following tenant consultation and approved a new
target of 5,000 new build homes for delivery by 2035. 
1.3 The Economic Regeneration Delivery Plan contributes to the priority outcome of
improving economic outcomes and opportunities, including a specific objective of
providing access to high quality housing across all tenures.  The report identified
delivery of the current proposals at Gowkthrapple from a strategic housing
perspective. 
1.4 The Council’s Local Housing Strategy (2021– 2026) supported by the Strategic
Housing Investment Plan has six strategic outcomes, including priorities to (amongst
others) promote supply of good quality affordable housing across all tenures,
contribute to regeneration and sustainability of places and improve stock condition
across all tenures.  The Local Housing Strategy further supports the redevelopment at
Gowkthrapple from a strategic perspective, enabling a new supply of homes fit for
purpose, future proofing the stock and contributing to wider regeneration of an area
Recommendations 
It is recommended that the Planning Committee: 
1) Approves the promotion of a Compulsory Purchase Order to acquire the property
at 99 Stanhope Place, Wishaw, together with all common rights pertaining thereto,
which property is shown on the plan annexed to this Report at Annex 2 and 5, for
the purpose of supporting the proper planning of the area. 
2) Gives Authority for the Head of Legal and Democratic Solutions to prepare all
Compulsory Purchase Order documentation and to take all necessary steps
including publication of all statutory notices to secure Confirmation of the Order
by the Scottish Ministers and the Vesting of the property in the Council.  
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement  (1) Ensure a housing mix that supports social inclusion and
economic growth

Page 3

particularly adversely affected by economic and social decline over recent decades. 
Concerns about the age of the Council's housing stock and future investment
requirements for certain types of stock, particularly tower accommodation has been
identified at Gowkthrapple and regeneration of the area has been a consideration of
the Council over many years. 
1.5 The combination of these interlinked strategies provides the context to this report
and ultimately facilitated the approval required for the strategy of demolition and
redevelopment to occur. Following further consultation in May 2018, the Council
identified the first phase of the reprovisioning strategy with 15 high-rise tower
blocks and 34 low-rise blocks throughout North Lanarkshire identified to be
demolished within three to five years, of which the Block in question at
Gowkthrapple was included.   
1.6 Redevelopment at Gowkthrapple has since been taken forward through planning
applications.  In particular, planning permission in principle (21/00982/PPP) is in
place for a redevelopment for the area and includes an Indicative Concept
Masterplan (Annex 4).  The permission was also developed and based upon the
Masterplan.  The Property subject of the proposed CPO is within Phase 2 of the
Masterplan at Stanhope Place (see plan attached at Annex 4). The Phase 2 area
currently includes 8 four-storey blocks of flats, with 128 individual units in total. 
1.7 Out of the 428 units across the full Gowkthrapple site earmarked for demolition,
only 3 were privately owned.  The rest are all owned by the Council. All tenants
have now been re-housed (with the exception of a limited number of elderly
residents remaining in Allershaw Tower who will move into the 18 new purpose-
built bungalows currently being constructed on the Phase 1 Masterplan site). Two
of the three private owners sold their property to the Council on a voluntary basis
whilst the other owner did not and currently remains within the Block. 
1.8 The Council approached the owner of 99 Stanhope Place in September 2019 to
begin negotiations for a voluntary acquisition of their property.  The Property was
surveyed in April 2021 and the owner verbally accepted the Council’s offer. In May
2021 the owner advised that they no longer wished to proceed with voluntary sale.
Every effort has been made to reach agreement however, the Council are in now in
the process of a procurement to appoint a contractor to commence the demolition
for Phases 2, 3 and 4 of the Masterplan.  Works are due to commence early in
2023.   The Council therefore now has no option but to commence a compulsory
purchase process otherwise it will not be possible to complete the Council’s
objectives to redevelop this area. The Council will continue to negotiate with the
owner for a voluntary acquisition in parallel with the CPO process. 
1.9 The Property is situated on the ground floor of block 97 – 127, the northern most
block within the Phase 2 area (the “Block”) The location of the Block is shown on
the Location Plan attached at Annexe 2 and the CPO Plan at Annex 5. The Block
contains 16 flats in total, all of which are empty apart from the property in question,
with the last tenant leaving in the middle of 2021. All empty flats within the Block
have windows shuttered and flat entrance doors boarded over. 
1.10 As noted, redevelopment at Gowkthrapple is a fundamental part of different
Council strategies, including the Economic Regeneration Delivery Plan, with
commitment to demolishing and replacing aging flats with a modern neighbourhood
of housing.  Retention of the Block and incorporation into the wider layout is not an
option to the Council because of its location within the Phase 2 area.  The
proposed redevelopment follows a well-considered master planning process and in

Page 4

physical terms, retention of the Block would mean that the Council would be unable
to implement the redevelopment plans for the Phase 2 area following demolition.
The regeneration proposals would replace the ageing flats within the area
earmarked for demolition as part of our re-provisioning programme and see
modern homes built for the varying and current needs of the local community. 
1.11 If the property in question can be acquired, this will result in the removal of the
ageing flats allowing replacement with a well-formed and attractive series of
residential properties in keeping with the scale and character of the surrounding
area. The regeneration proposals will also remove large areas of hardstanding and
allow new areas to be properly landscaped, as included in the Masterplan as a
green corridor. As a condition of grant funding, the new properties will be built to
the Scottish Governments Housing for Varying Needs Standards and will at least
meet the Governments Silver Standard - Aspects 1 and 2 - for Energy Efficiency.
They will also comply with the current building regulations at the time of tender
submission. This will result in new occupants having high quality, well insulated
homes with economical heating costs. The new homes will be consistent in design
alignment with the North Lanarkshire Council Net Zero Carbon Target of 2030. A
further condition of the grant funding stipulates that they should be Secure By
Design compliant, meaning the new homes will be fit for purpose and provide a
safe community space for future residents. 
1.12 The overall redevelopment for Gowkthrapple will see around 300 new homes
developed.  The aim is to regenerate the community by demolishing the existing
towers and flats and build new homes, retail, open space, play facilities and
improved transport infrastructure to create a new attractive, lower density and well-
connected neighbourhood.   
1.13 Around 100 of these properties (within the Phase 1 area) will be new build council
homes for social rent to help progress the Council’s target of delivering 5,000 new
homes by 2035, replacing the ageing flats with modern homes built for the varying
needs of the local community.  The works relative to the Phase I redevelopment
has already commenced. The overall redevelopment within Gowkthrapple would
see all towers and existing blocks of flats including Stanhope Place demolished
and replaced with new homes, potentially also involving private housebuilders or
other housing providers.   
1.14 The Council has various compulsory purchase powers available depending on the
circumstances.  In this instance, planning permission is in place for a Scheme of
redevelopment for the area (21/00982/PPP), as well as more detailed permission
(21/01316/MSC) on land to the west of Stanhope Place, which, as noted above, is
being constructed by the Council as Phase 1 of the Masterplan.  Progressing the
compulsory purchase through planning legislation is considered the most appropriate
means to take the matter forward and facilitate implementation of the overall
redevelopment.   
1.15 It is anticipated that the demolition works will commence early 2023.  If the Property 
has not been acquired before the demolition on the Phase 2 area commences then
this will increase risk and increase costs to the Council.  
1.16 While the Planning Committee previously considered the merits of the
redevelopment as Planning Authority via an application, the Council as highlighted
in paragraphs 1.1 to 1.5 above, has also approved the housing reprovisioning
programme, housing strategy and future tower strategy elsewhere and is
committed to the aspirations for the redevelopment at Gowkthrapple.  The
proposed CPO will also be reported to the Housing Committee for information.

Page 5

However, it is highlighted that there will be significant public benefits resulting from
the redevelopment, including the positive use of brownfield land, delivery of
housing, provision of modern homes (public and private), reprovisioning of
residents from the existing towers and flats and the creation of a new
neighbourhood with permeability, open space, landscaping, play provision and
some retail.   
1.17 Regeneration would also involve associated local inward investment and contribute
towards a range of other social and economic benefits for local people. This will
primarily be achieved via measurable Key Performance Indicators for Community
Benefits which will be delivered via the works contracts for the new homes. Such
deliverables tend to focus on community engagement with local schools,
community groups and residents, whether school visits to site, apprenticeships or
routes to work schemes. Local funding and support can be provided to charities,
complimenting a package of Community Benefit deliverables as a direct result of
the regeneration proposals. Direct economic benefits arise from supply chain
provision for the new homes via local contractors and labour force, combined with
training opportunities as previously noted. 
1.18 Out of approximately 400 flats currently within Phases 2, 3 and 4, this is the 
only property that currently remains in occupation with the windows of all other 
blocks being shuttered and with metal security doors fitted. Without a CPO, 
redevelopment of the Phase 2 area would not be possible, leaving a block of 16 
flats, with only one in occupation.  Retention of the block is not an option for the 
Council.  Whilst acknowledging the impact of the CPO on the owner, the significant         
public benefits are considered to outweigh the private interest in these 
circumstances.  Also, it is reiterated that efforts have been made to reach voluntary 
agreement in respect to purchasing the property.   
1.19 The Council owns all of the properties within Phases 2, 3 and 4 in the Masterplan
area aside from the Property. This presents a pressing need to conclude full
acquisition of all available property to allow wholescale regeneration to take place.
The Council has made a commitment to replace its own ageing housing stock with
more appropriate, energy efficient and Housing for Varying Needs compliant
housing. This will benefit the public by providing homes that are fit for purpose, and
future proofed based on the needs of residents both now and via projections of
future demand and requirements. The redevelopment of Phase 2 as planned
cannot be progressed without the acquisition by the Council of 99 Stanhope Place.
If the Property has not been acquired before the demolition of Stanhope Place
commences then the cost of the demolition contract will substantially increase. 
1.20 The Council has carefully considered the balance to be struck between individual
rights and the wider public interest. The landowner will be appropriately
compensated. For the reasons set out above, the Council considers that there is a
compelling case in the public interest for promotion of the CPO. The compulsory
purchase of the Property is considered necessary and proportionate in the
circumstances. 
2. Report 
2.1 Part VIII of the 1997 Town and Country Planning (Scotland) Act (the “Act”) sets out
the process which allows Local Authorities to exercise powers relating to the

Page 6

compulsory acquisition of land for development and other planning purposes.  Section
189(1) of the 1997 Act confers the power to the local authority to acquire compulsorily
any land in its area which: 
(a) Is suitable for and required in order to secure the carrying out of development,
redevelopment and improvement,
(b) Is required for a purpose which is necessary to achieve in the interests of the proper
planning of an area in which the land is situated.
2.2 In this instance, the Head of Planning and Regeneration considers that the land in
question is suitable for redevelopment and that without a Compulsory Purchase
Order, the last flat remaining within private ownership would prevent the proper
planning and overall redevelopment of the area. 
2.3 Section 189(2) requires that, in considering whether land is suitable for development,
redevelopment or improvement, a local authority shall have regard to the following
three criteria: 
(a) The provisions of the development plan, so far as material
(b) Whether planning permission for any development on the land is in force, and
(c) Any other considerations which would be material for the purposes of             
determining an application for planning permission for development on the land. 
(a) The provisions of the development plan, so far as material
2.4 The Development Plan consists of Clydeplan 2017 and the new North Lanarkshire
Local Development Plan 2022.  However, at the time of determining the recent
application for planning permission in principle (21/00982/PPP), the North
Lanarkshire Local Plan 2012 was in place.  That application, and associated
application 21/01316/MSC for the Phase 1 area were considered to accord with the
Development Plan and were approved earlier this year. The relevant policies were
Policy HCF1A Residential Areas (which aimed to protect residential amenity and
supported compatible development), Policy DSP3 Impact of Development (which
considered strategic impacts, e.g., a financial contribution towards school
infrastructure was required), and Policy DSP4 Quality of Development (which
considered design, development standards, impacts on surrounding land-uses and
infrastructure).  The scale of development is not of strategic significance in planning
terms and assessment against Clydeplan was not required.     
2.5 Within the new North Lanarkshire Local Development Plan 2022, the area covered
by the Masterplan is primarily designated a General Urban Area.  General Urban
Area policy PP3 Purpose of Place aims to maintain and improve the level of amenity
in urban areas, by encouraging development that is in keeping with their residential
character and encouraging diversity in more mixed-use areas.  The policy is
supportive of redevelopment ‘in principle’.  Furthermore, the Phase 1 area of the
Masterplan and planning permission is principle is actively promoted for residential
development, designated Policy PROM LOC 3 Housing Development Sites.   
2.6 The Local Development Plan also has more detailed technical assessment policies
against which development proposals are considered - policies EDQ1 Site
Appraisal, EDQ2 Specific Features for Consideration and EDQ3 Quality of
Development. These policies change the way in which proposals should be
assessed and the range of information required to support applications.

Page 7

2.7 The emerging Local Development Plan was treated as a material consideration
within the applications approved earlier this year.  It is considered that the detail of
development at the Phase 2 area via an application for Matters Specified in
Conditions could comply with the Development Plan, subject to the quality of the
application and design taken forward. 
(b) Whether planning permission for any development on the land is in force
2.8 As highlighted, the Committee has already considered an application
(21/00982/PPP) by North Lanarkshire Council for ‘Residential development,
ancillary retail, open space, landscaping, SUDS, access, associated works and
demolition (in principle)’. The Committee approved the application subject to 17
conditions and the decision notice was issued on 28 January 2022.  This includes
the land which is the subject of the proposed CPO and a wider Masterplan for the
redevelopment of Gowkthrapple.
2.9 Committee considered and approved a subsequent application (21/01316/MSC),
also submitted by North Lanarkshire Council on directly adjacent land but within the
same planning permission in principle and Masterplan. This was for Matters
Specified in Conditions (MSC) of the planning permission in principle and was
described as ‘Construction of 96 Dwellinghouses (Semi-Detached, Terraced,
Bungalows and Cottage Flats), Day Care Unit, New Infrastructure including Roads
and SUDS Drainage Systems (MSC application in relation to 21/00982/PPP)’.  Initial
groundworks have commenced at Phase 1.
2.10 A new MSC application for the Phase 2 area specifically relevant to the CPO would
be required to confirm design, layout and associated works. It is not known at this
stage when an application will be submitted.
2.11 The existing planning permissions demonstrate that the land which is the subject of
the proposed CPO already has planning permission in principle and there is no
obvious reason why a further application for Matters Specified in Conditions would
not be granted, discussed further in paragraph 2.13.   
(C) Any other considerations which would be material for the purposes of
determining an application for planning permission for development on the
land
2.12 There are a range of other possible considerations relevant to the redevelopment,
including national planning policy, advice notes and planning guidance.  A future
MSC application would also be subject to appropriate notification procedures,
advertisement, and consultation.  This could result in representations and specific
material considerations on final plans.  It is reiterated however, that planning
permission in principle has already been granted providing a robust basis for the
redevelopment and promotion of the compulsory purchase.  There is also
commitment to the redevelopment out with the planning process, within other
important Council priorities and strategies, such as the Economic Regeneration
Delivery Plan, future tower strategy and provision of new social housing.   
2.13 MSC applications would be required to consider detailed elements of all future
phases of development (including the Phase 2 area). It is not possible to prejudge
the outcome of a planning application without going through that process. There is
however sufficient comfort from the recent planning permission in principle and

Page 8

planning conditions in place, that subject to application quality the policies could be
complied with. The principle of development and a Masterplan has already been
granted planning permission, committing to the redevelopment of the Gowkthrapple
area. Subject to approval of details, this would be in accordance with the
Development Plan and is otherwise in the interests of the proper planning of the
area. The Phase 2 area forms an integral part of the Masterplan and demolition of
the block would be required to allow redevelopment to be physically implemented
and for the over design concepts to be achieved.  
2.14 Considering the above, the proposed Compulsory Purchase Order meets the
requirements to be progressed under planning legislation and the report
recommendations are provided above. 
3. Measures of success 
3.1  The acquisition of the property at 99 Stanhope Place helps the Council meet its
objectives set out in the Masterplan for Gowthrapple. 
4. Supporting documentation 
4.1 Appendices 1 to 5 (below) shows the location of 99 Stanhope Place within the wider
context including the approved masterplan area and its 4 phases.   
Annex 1 – Location Plan (Masterplan Site Boundary)
Annex 2 – Location Plan (99 Stanhope Place)
Annex 3 – Indicative Concept Masterplan Drawing 105 Rev D
Annex 4 – Masterplan Framework Phasing
Annex 5 - CPO Plan 
Pamela Humphries
Head of Planning and Regeneration

Page 9

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☒ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Provision has been made within the council’s Housing Revenue Account to fund the
purchase property at 99 Stanhope Place which will be contained within the budget for
the Open Market Purchase Scheme. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☒ No ☐
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Legal Advice has been obtained. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☒ No ☐
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☒

Page 10

If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☒ No ☒
If Yes, please provide a brief summary of the impact? 
The wider project has environment/carbon impact to consider, however this report
relates to the compulsory purchase of a remaining flat in private ownership. 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The proposal relates to the Compulsory Purchase of a private property where
agreement hasn’t been achieved.
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
Without the ownership of the full block at Stanhope Place the re-provisioning
programme will not be able to progress, this will have an adverse effect on the
Gowthrapple Masterplan and the local environment.

Page 11

Annex 1: Location Plan (Masterplan Site Boundary)

Page 12

Annex 2: Location Plan (99 Stanhope Place)

Page 13

Annex 3: Indicative Concept Masterplan Drawing 105 Rev D

Page 14

Annex 4: Masterplan Framework Phasing

Page 15

Annex 5: CPO Plan