Democracy Spraffa

Agenda Document Pack - Planning Committee - 12/10/2023

North Lanarkshire Council · 12 October 2023
Back to Planning Committee — 12 October 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

3 October 2023
Members of the
Planning Committee
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk
Notice is given that a Meeting of the Planning Committee is to be held in the Council Chamber, Civic Centre, Windmillhill
Street, Motherwell, ML1 1AB on Thursday, 12 October 2023 at 10:00 AM which you are requested to attend.
The agenda of business is attached.
Archie Aitken
Chief Officer (Legal & Democratic)
Members :
Clerk Name: Mark Hamill
Clerk Telephone: 07811294702
Clerk Email: hamillm@northlan.gov.uk
N Shevlin, G Currie, G Brennan, B Burgess, A Bustard, J Cairns, A Campbell, T Carragher, M Coyle, S Coyle, D Crichton,
K Docherty, L Jarvie, T Johnston, J Logue, H Loughran, M McPake, J McPhilemy, A McVey, J Reddin, D Robb, G
Robinson, A Smith, L Stubbs, G Woods.
Page 1 of 146

Page 2

Page 2 of 146

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical Standards In Public
Life Etc. (Scotland) Act 2000   
2 Planning Applications Index
Submit Planning Applications Index 
5 - 66 
3 Notice of Planning and Enforcement Appeals Decision
Submit report by the Chief Officer (Place) advising of one planning and
enforcement appeals decision 
67 - 68 
4 Draft Supplementary Guidance Education Contributions
Submit report by the Chief Officer (Place) seeking approval to undertake the public
consultation with external stakeholders on the Draft Supplementary Guidance on
Education Contributions 
69 - 102 
5 Scottish Government Directions on Finalised Supplementary
Guidance Planning and Noise and Affordable Housing
Submit report by the Chief Officer (Place) providing an update on the outcome of
the consultation with the Scottish Government on the Supplementary Guidance
Documents: Planning and Noise and Affordable Housing. 
103 - 146 
Page 3 of 146

Page 4

Page 4 of 146

Page 5

North
Lanarkshire
Council 
Planning Applications for consideration     
of Planning Committee 
Committee Date: 12-10-2023 
Ordnance Survey maps reproduced from Ordnance Survey
with permission of HMSO Crown Copyright reserved 
Item 2
Page 5 of 146

Page 6

APPLICATIONS FOR PLANNING COMMITTEE 
12th October 2023 
Page
No
Application No  Applicant Development/Site Recommendation 
7-19 22/00526/FUL  Mr Abdul Majid Demolition of a commercial unit and 2
detached houses and construction of 3
storey building with commercial unit on
ground floor with 6 flats above
120 North Road
Bellshill
ML4 1EX 
Grant 
20-43 22/01493/PPP  Moray Land
Farming
Partnership
Residential Development (Permission
in Principle)
Site South Of
Bedlay Castle
Cumbernauld Road
Chryston
G69 9HP 
Refuse 
44-51 23/00385/FUL  Mr Alan 
Wilson
Two semi detached dwellinghouses 
Land South Of
Heatheryford Gardens
Plains 
Refuse 
52-65 23/00649/S42  Mr Robert Hill Residential Development (in principle)
(Section 42 application to vary
condition 2 of planning permission in
principle 18/00580/PPP to carry out
site investigations and remediation for
each phase of development before
development starts within that phase)    
Site To The West Of
Morningside Road
Newmains  
Grant 
Page 6 of 146

Page 7

Application No:  
22/00526/FUL
Proposed Development: 
Demolition of a commercial unit and 2 detached houses and
construction of 3 storey building with commercial unit on ground
floor with 6 flats above 
Site Address: 
120 North Road
Bellshill
ML4 1EX 
Date Registered: 
26th May 2022 
Applicant:
Mr Abdul Majid
120 North Road
Bellshill
ML4 1EX 
Agent:
Lizzi Nutt
TINTO Architecture Ltd
Grandholm Crescent
Bridge of Don
Aberdeen
AB22 8BB 
Application Level:
Local Application 
Contrary to Development Plan:
No
Ward:   
15 Bellshill 
Angela Campbell,Pat Patton,Lisa Stubbs,Anne
McCrory,
Representations:
20 letter(s) of representation received
(17 objecting, 3 in support)   
Recommendation: Approve Subject to Conditions 
Reasoned Justification: 
It is considered that given that the existing site forms a retail premises and two dwellinghouses, that
the demolition of the existing shop and dwellinghouses and replacement with a mixed-use
development with a retail premises on the ground floor and six two-bedroom flats on the upper floors
is acceptable in terms of the zoning within the North Lanarkshire Local Development Plan 2022 and
surrounding properties on North Road. It is not considered that the development would result in
significant negative impacts to the amenity of neighbouring properties or the wider predominantly
residential area and is therefore considered acceptable in terms of the policies within the North
Lanarkshire Local Development Plan 2022  
Page 7 of 146

Page 8

Reproduced by permission of
the Ordnance Survey on
behalf of HMSO. © Crown
Copyright and database right
2009.  All rights reserved.
Ordnance Survey Licence
number 100023396.
Planning Application: 22/00526/FUL 
Name (of applicant): Mr Abdul Majid 
Site Address: 120 North Road, Bellshill
ML4 1EX 
Development: Demolition of a
commercial unit and 2 detached houses
and construction of 3 storey building with
commercial unit on ground floor with 6
flats above 
Page 8 of 146

Page 9

Proposed Conditions:- 
1. That, except as may otherwise be agreed in writing by the Planning Authority, the development
shall be implemented in accordance with drawing numbers:- 
3885-PL(00)001 RevF, 3885-PL(04)001 RevB & 3885-PL(00)002 RevD 
Reason: To clarify the drawings on which this approval of permission is founded. 
2. That BEFORE the development hereby permitted starts, full details of the facing materials to be
used on all external walls and roofs shall be submitted to, and approved in writing by the Planning
Authority and the development shall be implemented in accordance with the details approved
under the terms of this condition. 
Reason: To enable the Planning Authority to consider these aspects in detail. 
3. That before the development is complete and any of the dwellings hereby permitted are occupied,
all the parking and manoeuvring areas shown on the approved plans, shall be levelled, properly
drained, surfaced in a material which the Planning Authority has approved in writing before the
start of surfacing work and clearly marked out, and shall, thereafter, be maintained as parking
and manoeuvring areas. Thereafter, all off-street car parking spaces shall be provided within the
site, as described on the approved plans and shall, thereafter, be maintained as car parking
spaces. 
Reason: In the interests of traffic safety. 
4. That BEFORE the development hereby permitted starts, full details of the design and location of
all fences and walls to be erected on the site shall be submitted to, and approved in writing by the
Planning Authority. Unless otherwise agreed in writing by the Planning Authority and for the
avoidance of doubt, the boundary enclosure for the site shall be 2m in height and be either a wall
or close boarded fence to ground level. 
Reason: To enable the Planning Authority to consider these aspects in detail. 
5. That BEFORE any of the dwellings hereby permitted, are occupied, the fences, or walls, as
approved under the terms of Condition 4 above, shall be erected. 
Reason: To ensure the provision of adequate boundary treatment at the site. 
6. That BEFORE any works of any description start on the application site, unless otherwise agreed
in writing with the Planning Authority, a comprehensive site investigation report shall be submitted
to and for the approval of the said Authority.  The investigation must be carried out in accordance
with current best practice advice, such as BS 10175 : 'The Investigation of Potentially
Contaminated Sites' or CLR 11.  The report must include a site specific risk assessment of all
relevant pollution linkages and a conceptual site model.  Depending on the results of the
investigation, a detailed Remediation Strategy may be required. Information on the required
format of the report and how it should be submitted to us can be found online:
https://www.northlanarkshire.gov.uk/planning-and-building/planning-applications/how-discharge-
contaminated-land-planning-conditions 
Reason: To establish whether or not site decontamination is required in the interests of the
amenity and wellbeing of future residents. 
7. That any remediation works identified by the site investigation required in terms of Condition 6
above , shall be carried out to the satisfaction of the Planning Authority.  A certificate (signed by
a chartered Environmental Engineer) shall be submitted to the Planning Authority confirming that
any remediation works have been carried out in accordance with the terms of the Remediation
Strategy. 
Reason: To ensure that the site is free of contamination in the interests of the amenity and
wellbeing of future residents. 
Page 9 of 146

Page 10

8. Notwithstanding details included in drawings hereby approved, the permission does not include
any form of hot food takeaway element. For the avoidance of doubt, a further application will be
required to be submitted if the applicant wishes to prepare, cook and sell hot food within the new
shop. 
Reason: To ensure that this element of the proposal has been fully assessed in terms of the
impacts to residents of the flats above, and neighbouring properties in terms of odour and noise. 
9. Noise associated with the external plant shall not give rise to a noise level, assessed with the
windows open, within any dwelling or noise sensitive buildings in excess of the equivalent to Noise
Rating Curve (N.R.C.) 30 between 07.00 hours and 23.00 hours and N.R.C. 25 at all other times. 
Reason: In the interests of ensuring that the plant noise is within acceptable levels 
10. That unless otherwise agreed in writing by the Planning Authority, prior to any works taking place
on site, full details of the proposed plant and acoustic enclosure shall be submitted for written
authorisation by the Planning Authority. For the avoidance of doubt, this will include the
submission of additional drawings showing the exact location of the proposed plant works, the
make, model and specifications of the proposed plant works and full details of the proposed
acoustic enclosure to be provided. 
Reason: In the interests of ensuring that the plant noise is within acceptable levels 
11. Once the plant works and acoustic enclosure have been installed, a post work validation report
shall be submitted for written authorisation by the Planning Authority. For the avoidance of doubt,
this should be carried out by a qualified professional and it should include a noise survey,
demonstrating that the appropriate noise level standards have been achieved by the mitigation. 
Reason: In the interests of ensuring that the plant noise is within acceptable levels 
12. That unless otherwise agreed in writing by the Planning Authority, vehicle deliveries to the site
shall be as specified in the Ellendale Environmental Noise Impact Assessment section 5 page 37,
dated 7th July 2023. For the avoidance of doubt, no HGV deliveries shall occur before 07:00 on
any days. Any other deliveries made by panel vans shall occur no earlier than 06:00 and vehicle
engines will be switched off whilst goods are transferred on foot from the vehicle to the retail unit
via the access gate and rear service yard. 
Reason: To safeguard the residential amenity of the area. 
13. That before any works take place on site, full details of the proposed acoustic enclosure for the
service area shall be submitted for written authorisation by the Planning Authority. 
Reason: To safeguard the residential amenity of the area. 
14. That before any works take place on site, full details of proposed windows and ventilation systems
including their specifications are required to be submitted for written authorisation by the Planning
Authority. For the avoidance of doubt, details shall be accompanied by an assessment of their
efficacy in achieving the appropriate indoor noise standards for the development and should be
accompanied by drawings. 
Reason: To safeguard the residential amenity of the area. 
15. Once the windows have been installed, a post work validation report shall be submitted for written
authorisation by the Planning Authority. For the avoidance of doubt, this should be carried out by
a qualified professional and it should include a noise survey, demonstrating that the appropriate
noise level standards have been achieved by the mitigation 
Reason: To safeguard the residential amenity of the area.  
Page 10 of 146

Page 11

16. Prior to any works on site full details shall be submitted with regard to external lighting proposed
for the development. For the avoidance of doubt, this should be designed such that the scheme
minimises the upward spread of light near to and above the horizontal as well as reducing the
spill of light and glare to a minimum by ensuring that the main beam angle of all lights directed
towards any potential observer is not more than 70 degrees. 
Reason: To safeguard the residential amenity of the area. 
17. As one Soprano Pipistrelle bat roost has been confirmed as an ecological constraint by the Acorna
Ecology Ltd, Bat Roost Potential & Subsequent Presence/Absence Survey - May-June 2023, an
application is required to be submitted to NatureScot for a Bat License before any works are
carried out on site. Once the license has been issued by NatureScot, full details of the license
shall be submitted for written authorisation by the Planning Authority before any development is
commenced on site. 
Reason: To ensure compliance with The Conservation (Natural Habitats & c.) Regulations 1994
(as amended); the Wildlife and Countryside Act (1981) as amended and the Nature Conservation
(Scotland) Act 2004..' 
18. That any mitigation works identified as required by the bat license in terms of condition 17 above
shall be carried out in accordance with the terms of the bat license; to the satisfaction of the
Planning Authority. 
Reason: To ensure compliance with the terms of the Bat License issued by Naturescot and The
Conservation (Natural Habitats & c.) Regulations 1994 (as amended); the Wildlife and
Countryside Act (1981) as amended and the Nature Conservation (Scotland) Act 2004..' 
19. That notwithstanding the terms of conditions 18 and 19 above and that before the development
hereby permitted starts, a Bat Method Statement covering all demolition and construction works
shall be submitted to, and approved in writing by the Planning Authority in consultation with
Naturescot. 
Reason: To ensure compliance with The Conservation (Natural Habitats & c.) Regulations 1994
(as amended); the Wildlife and Countryside Act (1981) as amended and the Nature Conservation
(Scotland) Act 2004.' 
20. That any mitigation works identified by the Bat Method Statement in terms of condition 19 above
shall be carried out in accordance with the terms of the Bat Method Statement; to the satisfaction
of the Planning Authority. 
Reason: To ensure compliance with The Conservation (Natural Habitats & c.) Regulations 1994
(as amended); the Wildlife and Countryside Act (1981) as amended and the Nature Conservation
(Scotland) Act 2004. 
21. That BEFORE the development hereby permitted starts, unless otherwise agreed in writing with
the Planning Authority, full details of the proposed surface water drainage scheme shall be
submitted to the said Authority and shall be certified by a chartered civil engineer as complying
with the most recent SEPA SUDS guidance. 
Reason: To ensure that the drainage scheme complies with best SUDS practice to protect
adjacent watercourses and groundwater and in the interests of the amenity and wellbeing of
existing and future residents adjacent to and within the development site. 
22. That the SUDS compliant surface water drainage scheme approved in terms of Condition 21
above shall be implemented contemporaneously with the development in so far as is reasonably
practical.  Within three months of the construction of the SUDS, a certificate (signed by a
Chartered Civil Engineer experienced in drainage works) shall be submitted to the Planning
Authority confirming that the SUDS has been constructed in accordance with the relevant CIRIA
Manual and the approved plans. 
Reason: To safeguard adjacent watercourses and groundwater from pollution and in the interests
of the amenity and wellbeing of existing and future residents adjacent to and within the
Page 11 of 146

Page 12

development site. 
23. That prior to the commencement of development, the applicant shall provide written confirmation
to the Planning Authority that all the requirements of Scottish Water can be fully met to
demonstrate that the development will not have an impact on their assets, and that suitable
infrastructure can be put in place to support the development. 
Reason: To ensure the provision of satisfactory drainage arrangements. 
24. That BEFORE the development hereby permitted starts, a scheme of landscaping shall be
submitted to, and approved in writing by the Planning Authority, and it shall include:- 
(a) details of any earth moulding and hard landscaping, boundary treatment, grass seeding and
turfing;
(b) a scheme of tree and shrub planting, incorporating details of the location, number, variety and
size of trees and shrubs to be planted;
(c) a detailed timetable for all landscaping works which shall provide for these works being carried
out contemporaneously with the development of the site. 
Reason: To enable the Planning Authority to consider these aspects in detail, to ensure high
quality visual amenity. 
25. That all works included in the scheme of landscaping and planting, approved under the terms of
condition 24 above, shall be completed in accordance with the approved timetable, and any trees,
shrubs, or areas of grass which die, are removed, damaged, or become diseased, within two
years of the full occupation of the development hereby permitted, shall be replaced within the
following year with others of a similar size and species. 
Reason: To ensure the implementation of the landscaping scheme in the interest of amenity. 
26. That BEFORE the development herby permitted starts, a detailed drawing showing the location
of all bin stores and boundary enclosures shall be submitted to and approved in writing by the
Planning Authority. 
Reason: In the interest of the amenity of the site and the general area. 
Background Papers: 
Consultation Responses: 
Traffic & Transportation received on 28/06/22, 13/09/22 and 04/11/22 
NLC Greenspace received on 16/09/22 and 05/06/23 
Environmental Health (including Pollution Control) received on 24/06/22, 16/03/23 and 18/08/23 
Contact Information: 
Mr Gary McEwan at esplanning@northlan.gov.uk or 01236 632500 
Report Date: 
2nd October 2023
Page 12 of 146

Page 13

APPLICATION NO. 22/00526/FUL 
REPORT 
1. Site Description 
1.1 The site is approximately 0.174 hectares and incorporates an existing retail unit and two
dwellinghouses (to be demolished as part of the application), one to the north and one to the
south of the retail unit. The site is located on North Road/B7070 which is a main thoroughfare,
running from north to south, parallel with the A725 to the west, from the southern boundary of
Coatbridge into the centre of Bellshill. There are currently 3 access points on North Road serving
each of the existing properties. North Road is a busy thoroughfare which has a mix of residential
and commercial uses, albeit North Road and the wider surrounding area is predominantly
residential. The site is approximately 400m from Bellshill town Centre to the south. 
2. Proposed Development 
2.1 The proposed development involves the demolition of the existing single storey retail unit, the
single storey detached dwelling to the north of the retail unit and the two-storey detached
dwelling to the south of the retail unit. In their place would be a modern three storey, mixed use
development, with a retail unit located on the ground floor, and six two-bedroom apartments
located on the upper floors.  A single access will serve a shared 22 space car park for both the
shops and flats and this parking area will also allow servicing of the retail unit. 
3. Applicant’s Supporting Information 
3.1 Alongside the drawings, the applicant has provided various accompanying documents,
including a planning statement, a design and access statement, a noise impact assessment, a
bat survey, and a transportation statement. 
4. Site History 
4.1 Planning permission was refused 08/01053/FUL for alterations and single storey extension to
retail unit, including a car park, relocation of ATM and for a change of use to part of the unit to
a hot food takeaway. Following from this an application 08/01053/FUL was granted for a single
storey extension to rear of shop, relocation of ATM and siting of air conditioning units. There
was an application 10/00361/FUL, which was granted for alterations to shopfront and a change
to the enclosure for the air conditioning units and for the installation of a bin store. A further
application 17/01865/FUL was refused for the change of use of a part of the unit to form a hot
food takeaway. 
5. Development Plan 
5.1 The proposal requires to be assessed under the terms of the North Lanarkshire Local
Development Plan (NLLDP) 2022 and in particular under the terms of: 
• PP 3 POLICY Purpose of Place
• AD 3 POLICY Amount of Development
• EDQ1 Site Appraisal
• EDQ3 Quality of Development 
5.2 As highlighted in 5.1 above, the site is allocated within the Urban Area, where Purpose of Place
Policy PP3 applies. The aim of the Plan within these areas is to maintain and improve the level
of amenity appropriate for the local context and encourage diversity in more mixed-use areas.
This policy requires such proposals to be assessed against the criteria of AD 3 (Amount of
Development), EDQ1 (Site Appraisal) and EDQ3 (Quality of Development) which considers
issues such as location of development, size, materials and road safety and which states that
proposals must integrate successfully, with the surrounding area, by avoiding harm to the
neighbouring amenity. 
Page 13 of 146

Page 14

5.3 NPF4 forms part of the development plan. Given the nature and scale of the development, the
most relevant considerations are already enshrined in the North Lanarkshire Local Development
Plan policies. The policies within NPF4 that are relevant to the application are Policy 14 - Design,
Quality and Place, and Policy 16 - Quality Homes.  
6. Consultations 
6.1 NLC Pollution Control raises no objection to the application provided that appropriate
conditions are attached to any approval in relation to a Site Investigation, noise (regarding air
conditioning units, road noise and glazing proposed for flats) ventilation and external lighting.
Finally, they have requested that a restrictive condition be attached to the permission to ensure
that the unit cannot install a hot food takeaway element to the proposal without planning
permission, to ensure that the impacts of such a scheme can be fully assessed. Conditions have
been attached, which address all of the above matters. 
6.2 NLC Greenspace raises no objection to the application provided that appropriate conditions
are attached to any approval in relation to the applicant attaining a bat license from Naturescot
before any works take place on site, and for the applicant to adhere to the recommendations
within the Acorna Ecology Ltd, Bat Roost Potential & Subsequent Presence/Absence Survey -
May-June 2023. Conditions have been attached which require the applicant to obtain a bat
license from Naturescot, with full details of the license to be submitted for written approval by
the Planning Authority before any development takes place on site, and that all
recommendations of this application are adhered to. Conditions have also been attached to
ensure that a bat method statement is submitted for written approval by the Planning Authority
before any works take place on site and that any mitigation works identified by the Bat Method
Statement shall be carried out in accordance with the terms of the Bat Method Statement. 
6.3 NLC Traffic and Transportation has recommended refusal of the planning application in terms
of minimum junction spacing, car parking and servicing arrangement for the retail premises.
Detailed discussions have taken place in respect to the layout with additional supporting
information and updated layouts provided. In terms of the junction spacing, this was considered
during the above-mentioned discussions, however it was determined that moving the location
of the access to the south of the site would result in more negative impacts for neighbouring
properties. In any case an altered access location would also fail to meet Traffic and
Transportation’s minimum junction spacing standards. It is therefore considered that given that
the proposal would reduce the number of accesses at the site from 3 (for the retail premises
and the 2 houses) down to 1, on balance the new access is considered acceptable. In terms of
car parking, there is a shortfall in parking proposed, and while it is acknowledged that the
proposal will result in the intensification of the site, there is currently no parking for the shop at
present. The proposal would introduce 22 parking spaces to be shared by shop customers and
occupants of the 6 flats. It should also be noted that the property, being on a main bus route,
and 0.9km from Bellshill Train Station, is well served by public transport infrastructure. Given
that there is no parking at present, that the site is located on a main bus route (with a bus stop
directly outside the existing shop) and the proximity of Bellshill Town Centre, it is considered
that the parking proposed is acceptable. In terms of the servicing arrangement proposed, initially
the applicant proposed a layby solution which was to be utilised by the service vehicles and for
the bus stop, however Traffic and Transportation deemed that the conflict between buses,
service vehicles and potential parked cars would be problematic. A second option was therefore
proposed, whereby the service vehicles would utilise the car park area leaving the bus stop to
the front of the unit (the service yard and the main storage area within the building and the
access to it are located towards the rear of the building making it more attractive to service the
proposed shop from the shared carpark). Traffic and Transportation comments are noted;
however, the existing shop receives deliveries via the front of the shop. The current proposal
has the potential remove the existing conflict with buses to the front of the retail unit, easing
congestion on North Road at this point. While there may be some conflict occasionally between
users of the car parking area and the service deliveries, and while it is recognised that that there
may be more frequent/larger deliveries due to the increased size of the retail unit, this option on
balance is considered acceptable and will result in fewer conflicts with traffic on North Road
than the present situation. 
Page 14 of 146

Page 15

7. Representations 
7.1 Following neighbour notification procedure, twenty (seventeen objection and three supporting)
letters of representation were received within the allowed timeframe for making representation.
These are summarised as follows: 
Objection comments 
• Traffic and Road Safety – Parking and trying to get out of driveways is dangerous enough
without traffic generated by larger shop and flats, creating more congestion for North Road
and neighbouring streets. The access is too close to the junction with Rowanden Avenue. The
junction is already dangerous due to customers parking cars on both sides of the road. The
proposal will result in more parking on North Road as proposed parking area is insufficient and
those using shop will not use car park. Existing problems will be exacerbated by proposal with
existing bus stop (North Road is main bus route), staff and customer parking and conflict with
service vehicles. Occasionally there are 2-3 delivery vehicles at a time and there are not
adequate loading facilities for lorries on North Road. Delivery numbers will also increase with
larger shop. The demolition and construction will also impact traffic on North Road and
surrounding streets. The car park at the pharmacy along the road, does not reduce customer
parking on North Road. North Road surface is already in bad condition, development will make
it worse.
• Sunlight/Daylight/Overbearing – Building will overshadow surrounding properties, blocking
light to homes and gardens. Also, a 3-storey building at this location will appear overbearing.
• Privacy – The 3-storey property will result in the loss of privacy and overlooking.
• Design – The 3-storey property will not be in-keeping with the surrounding properties which
are a mix of single and 2-storeys in height. The substantially taller building with a flat roof is
something more akin to what would be seen in a retail park.
• Odour/Air pollution – Exhaust fumes from car park will impact on health of local residents.
• Hot Food Takeaway – For several years the applicant has been running hot food takeaway
‘Babas Kitchen’, without permission, which has resulted in parking issues, litter and noise. The
premises should also not be serving hot food as there are no toilet facilities for customers.
• Drainage – There is no capacity for further flats. Victorian drainage system is not fit for purpose
when under pressure. Connection of flats to the system will place further strain on the system.
Drainage problems on North Road also add to congestion issues.
• Existing Retail – There is no need for more retail space as area is well served by various
supermarkets in the area.
• Overdevelopment – The proposal is considered overdevelopment. Also, there is no amenity
space for flats.
• Disturbance during development – There will be increased noise, dust and other debris
generated during demolition and construction of development. The development will also
result in further congestion during building works.
• Seagull problem – There is a seagull problem in the area which has been exacerbated in the
past by staff from the shop feeding old bread to them. The proposed development with its flat
roof design will provide nesting sites for the birds.
• Noise – Noise will be generated by the development. The users of the car park including the
unloading of deliveries will generate significant noise, opening and closing of doors of vehicles,
engine noise, especially while reversing and while left running, as well as shouting from
drivers. This happens with the current retail premises often early in the morning and it is likely
that deliveries will increase due to the increased size of the premises. There will also be no
time limit for users of the car park. Also, air conditioning units, which are not shown on the
drawings, without the appropriate screening will result in noise being heard by neighbouring
dwellings. The shop owner originally failed to install the correct screening for the existing AC
units which were installed following the previous application to extend the shop. 
• Drawing details – Lack of detail on drawings, no dimensions given, materials details, where
refrigeration units will be located, no boundary treatment details given, which raises security
and privacy concerns. Bin store locations are also not provided, which raises concerns
regarding odours and vermin. No details have been provided in relation to lighting including
external lighting for car park, security lighting and the light generated by the flats.
• Croftpark Street – Currently used as ‘short-cut’ and people speed along the street. Problem
will get worse with development.
• Dog owners – The owner of the shop encourages dog owners to leave there dogs outside
Page 15 of 146

Page 16

while they shop. The dogs foul the pavement and frighten passers-by.
• Nature of development – It is not clear what the nature of the business of the new commercial
unit will be.
• Application should be major – Given that the area is historically a residential area, it would
be expected that some benefit or enhancement to the area would occur with such a major
construction. This application should be deemed to be a major application.
• Reuse of vacant retail – Vacant retail premises, of which there are many within the area
should be utilised instead of building new units in accordance with local aims of directing such
developments to town centres or secondary retail areas. 
Supporting comments 
• Parking – More off-street parking will help with congestion, reducing on-street parking making
North Road safer.
• Housing – More housing of a type desperately needed in the area.
• Employment – Larger shop will employ more staff.
• Benefits community – The current shop provides a local service to those who are less able
to travel distances such as the elderly and those with disabilities. Existing shop provides
banking facilities at the post office, which is a lifeline. 
8. Planning Assessment 
8.1 Under Section 25 of the Town and Country Planning (Scotland) Act 1997, planning decisions
must be made in accordance with the development plan unless material considerations indicate
otherwise. 
8.2 Within the NLLDP the site is covered by Policy PP3 General Urban Area which seeks to maintain
and improve the level of amenity appropriate for the local context and encourage diversity in
more mixed-use areas.  This policy also requires such proposals to be assessed against the
criteria of AD 3 (Amount of Development), EDQ 1 (Site Appraisal) and EDQ 3 (Quality of
Development) which consider issues such as size, materials and road safety and which states
that proposals must integrate successfully with the surrounding area by avoiding harm to the
neighbouring amenity. In terms of scale and massing, and design, initially the development was
larger in terms of its scale, mass and height, however, the scheme has now been reduced in
size, with only 6 flats proposed instead of 7 originally. The height of the development has been
reduced to 8m in height at its highest point, to match closely the height of the existing 2 storey
dwellinghouse to be demolished (7.25m approximately) and the existing retail unit (7m
approximately). The houses on the opposite side of North Road although only 2 storeys are of
similar height.  It should also be noted that the existing two storey house and retail unit (which
are located very closely together), have a combined width of 25m approximately, whereas the
proposed unit would have a width of 26m approximately. Also of note is that the scale of the
development has been broken up with the use of lighter and darker materials on the ground and
first floor and the third floor respectively. Finally, the scale and mass of the building on the south
side, has been reduced by stepping the upper floors (the third floor is also stepped back from
the front elevation). It is considered that while the proposal will appear different from the existing
residential properties in terms of the modern design, and will be larger in terms of scale and
mass than surrounding houses, given its location on a main thoroughfare and that it will not be
significantly taller or wider than the existing two storey dwellinghouse and retail unit, it is
considered that the new development is acceptable in terms of scale, massing and design and
will not appear overbearing to neighbouring properties. In terms of road safety, while NLC Traffic
and Transportation comments are noted, it is considered that with the reduction of the number
of accesses (from 3 to 1), the introduction of an off-street parking area, and that deliveries will
be taken from the new parking area instead of North Road, that on balance the proposed
development will improve upon the existing arrangement at this location. Given the size and
scale of the proposal and its location relative to surrounding properties, it is considered that the
proposal would not result in any significant sunlight or daylight issues. In terms of privacy, while
the ground floor of the proposal would come quite far back into the site, up to 7.5m from the
rear boundary, the upper floor flats would be 19m approximately from the shared rear boundary
with Nos. 19, 17, 15 and 13 Croftpark Street. The closest neighbouring window to the rear
elevation of the upper floors is 24m approximately (at Number 15 Croftpark Street), which is
considered acceptable in terms of privacy. In terms of the property at No. 116 North Road, there
Page 16 of 146

Page 17

is a side facing window which would be 11m approximately from the 3rd floor, side facing
windows of the new development, however it is noted that there are existing side facing windows
on the two-storey house to be demolished which are 5m away approximately. It is therefore
considered that the development would not result in any greater privacy issues at No. 116 North
Road than at present. In any case the proximity of the windows would be offset by the fact that
the onlooking windows of the development would be located on the 3rd floor, whereas the
window at No. 116 North Road is at ground level. In terms of the property at number 126 North
Road, and those on the opposite side of North Road at Nos. 111 North Road and No. 1
Rowanden Avenue, these are 23m, 26m and 33m (approximately) respectively away from the
closest windows of the new development. While there will be some overlooking of garden
grounds because of the development, this would not be significantly greater than from two
storey dwellings given the height of the proposed development. It is therefore considered that
the development is acceptable from a privacy perspective. In terms of amenity space, it is
recognised that there is a lack of outdoor amenity space. The applicant has attempted to
address this matter by giving each flat a balcony/terrace. It should also be noted that many
flatted properties in and around town centres do not have lots of amenity space. It is therefore
considered that amenity space is acceptable in this instance. It is therefore considered that the
proposal complies with Policies PP 3, AD 3, EDQ 1 and EDQ 3 of the adopted North Lanarkshire
Local Development Plan. 
8.3 In terms of National Planning Framework 4 (NPF4), the most notable policies which affect the
proposal are Policy 14 - Design, Quality and Place and Policy 16 - Quality Homes.  These
policies are embedded and reflected within the NLLDP policies listed above. 
8.4 Policy 14 states that development proposals should be designed to improve the quality of an
area whether in urban or rural locations and regardless of scale.  Proposals will be supported if
the development is consistent with the six qualities of successful places as set out in Appendix
D of NPF4, namely:- Healthy, Pleasant, Connected, Distinctive, Sustainable and Adaptable.  It
is considered that the proposal is consistent with these qualities and is of a good design and
without detriment to the surrounding area, it is therefore considered to comply with this policy. 
8.5 Policy 16 supports developments for new homes on land allocated for housing in the LDP.  The
application site is within the urban area and the proposed development includes 6 flatted units
for housing, so therefore meets the terms of this policy as it helps the Council’s ambition to
reach its target for there being a mix of housing types and size of units within the area.  It will
not have a detrimental impact on the area and is compliant with the general principles of this
policy. 
8.6 The above NPF 4 policies are embedded in the adopted NLLDP and, in particular, Policies PP
3, AD 3, EDQ 1 and EDQ 3 discussed in 8.2 above.  The development is therefore considered
to be consistent with both NPF 4 and NLLDP policies. 
Representations 
8.7 In response to the grounds of representation above in 7.1, these are commented on in the same
order as they appear above: 
Objections 
• Traffic and Road safety – It is considered that with the reduction of the number of accesses
(from 3 to 1), the introduction of an off-street parking area that will also allow for delivery
vehicles to service the proposed shop will mean that deliveries should be taken from North
Road, that on balance the proposed development will improve upon the existing arrangement
at this location where there are 3 access points and on road servicing of the shop is the only
option 
• Sunlight/Daylight/Overbearing – Given the location and design of the proposed
development in relation to neighbouring properties, it is not considered that the proposal will
result in a significant negative impact on the sunlight or daylight received by neighbouring
dwellinghouses. It is also considered that the changes made to the scheme ensures that it
will not appear overbearing for neighbouring dwellings.
• Privacy - As indicated in paragraph number 8.2 above, the proposal raises no window-to-
window issues and while there will be some overlooking of garden grounds as a result of the
Page 17 of 146

Page 18

development, this would not be significantly greater than two storey dwellings given the
height of the proposed development. It is therefore considered that the development is
acceptable from a privacy perspective.
• Design – As is indicated in paragraph number 8.2 above, while the proposal will appear
different from the existing residential properties in terms of the modern design and will be
larger in terms of scale and mass than surrounding houses, given the changes made to the
scheme, the proposal is considered acceptable in terms of scale, massing and design.
• Odour/Air pollution – Comments are noted, however, NLC Pollution Control has raised no
concerns in this regard.
• Hot food takeaway – Comments are noted regarding ‘Babas kitchen’, however if this matter
is to be looked into by the Planning Service, then a separate enforcement complaint should
be made via the Council’s website. In terms of the proposed unit, a condition is in place that
requires that a separate planning application will require to be made, if the applicant wishes
to prepare cook and sell hot food within the new retail premises.
• Drainage – A condition attached to the permission requires the applicant to provide written
confirmation to the Planning Authority that all the requirements of Scottish Water can be fully
met to demonstrate that the development will not have an impact on their assets, and that
suitable infrastructure can be put in place to support the development. Furthermore,
conditions are also attached requiring the applicant to submit and implement a surface water
drainage scheme for written authorisation by the Planning Service.
• Existing Retail – Whether there are other supermarkets in the area and whether there is a
‘need’ for a larger retail unit at this location are not material to the current application. This
proposal is to replace an existing shop that serves local needs albeit with a larger unit which
is considered to be acceptable in planning terms 
• Overdevelopment – While it is noted that there is a lack of outdoor amenity space, the
applicant has attempted to address this matter by giving each flat a balcony/terrace. It should
also be noted that many flatted properties in and around town centres do not have lots of
amenity space. In terms of over development, the proposal involves the demolition of 3
properties and the erection of 1 property. Given the details discussed above in relation to the
height, scale and massing of the development, it is not considered to be overdevelopment.
• Disturbance during development – Comments are noted. NLC Pollution Control has
provided comments relating to this, which will be attached to any permission as an
informative.
• Seagull problem – Whether or not the area has a ‘seagull problem’, is not a material
planning consideration. This would potentially be a matter for other council services such as
Environmental Health 
• Noise – NLC Pollution Control has provided comment on this matter and are happy with the
proposed development provided that their concerns are addressed via condition. Conditions
have been attached to the permission addressing noise matters.
• Drawing details – Drawing details are considered sufficient to allow the Planning Authority
to assess the application. Conditions have been attached to ensure that further details be
submitted prior to any works taking place on site.
• Croftpark Street – It is possible that traffic may increase on Croftpark Street during
construction, however, there is no reason to believe that the completed development should
lead to more traffic along Croftpark Street.
• Dog owners – The activity of dog owners and their dogs is not a material planning
consideration.
• Nature of development – The ground floor of the new development will be a similar, but
larger convenience store than exists at present.
• Application should be major – The level of an application and whether it is major is
determined by the size of the development site, area of floorspace in terms of retail
development, and dwelling numbers in terms of flats and houses. Neither are large enough
to be considered a major development in terms of the proposed development.
• Reuse of vacant retail – This is not a material planning consideration. 
Support 
• Parking – Noted.
• Housing – Noted.
• Employment – Noted.
• Benefits community – Noted.
Page 18 of 146

Page 19

9. Conclusions 
9.1 In conclusion, following assessment of the application and notwithstanding the objections
received, it is considered that the proposed mixed-use development satisfactorily complies
with the relevant policies of the North Lanarkshire Local Development Plan and with the
general principles of NPF 4.  It is therefore recommended that planning permission is granted,  
Page 19 of 146

Page 20

Application No:  
22/01493/PPP
Proposed Development: 
Residential Development (Permission in Principle) 
Site Address: 
Site South Of
Bedlay Castle
Cumbernauld Road
Chryston
G69 9HP 
Date Registered: 
6th January 2023 
Applicant:
Moray Land Farming Partnership
c/o First Names (Isle of Man) Ltd
First Names House
Victoria Road
Douglas, 
Isle of Man
IM2 4DF 
Agent:
Springfield Properties PLC
Springfield House
3 Central Park Avenue, 
Larbert, 
FK5 4RX 
Application Level:
Local Application 
Contrary to Development Plan:
No
Ward:   
05 Stepps, Chryston And Muirhead 
John McLaren,Josh Cairns,Claire Louise Williams,
Representations:
80 letter(s) of representation received.   
Recommendation: Refuse 
Reasoned Justification: 
The proposed development is considered contrary to the green belt policies in the NPF4 Policies 8
and 16(f) along with policy (Purpose of Place Policy PP4) of the North Lanarkshire Local Development
Plan (2022) as the application has failed to justify the proposals in terms with it being associated with
an acceptable Green Belt use or special circumstances or specific locational need that warrant
approval of the application in this instance. The proposal is also considered to be contrary to Policies
EDQ1 & 3 in that the proposed access arrangements are considered to be unsafe.  
Page 20 of 146

Page 21

Reproduced by permission of
the Ordnance Survey on
behalf of HMSO. © Crown
Copyright and database right
2009.  All rights reserved.
Ordnance Survey Licence
number 100023396.
Planning Application: 22/01493/PPP 
Name (of applicant): Moray Land Farming
Partnership
Site Address: Site South Of
Bedlay Castle
Cumbernauld Road
Chryston
G69 9HP
Development: Residential Development
(Permission in Principle)   
Page 21 of 146

Page 22

Reasons for refusal: 
1. The proposed development is contrary to the Green Belt policies in the NPF4 Policy 8 along with
Purpose of Place Policy PP4 of the North Lanarkshire Local Development Plan (2022). In
particular, the development would result in an unacceptable impact as it would result in the loss
of a valuable area of land that was historically associated with Belday Castle and which still helps
to separate and define the settlements of Chryston and Moodiesburn and as such contributing
strongly to the character of the area. No adequate justification, special circumstances or material
considerations have been demonstrated to merit a departure from the development plan. 
2. That the proposed development is contrary to policy 16 Quality Homes of NPF4, in that the
residential aspect of the proposed development does not meet the criteria which would justify
residential development on a site that has not been allocated for housing in the North Lanarkshire
Local Development Plan. 
3. The proposed development is contrary to policies EDQ 1-3 Environmental and Design Quality
Policies as the appropriate junction arrangement at this location cannot be adequately achieved
creating an unacceptable detrimental impact on road safety. 
4. No proposals have been forwarded that will achieve significant and clearly defined additional
public benefits in accordance with relevant Scottish Government policy on woodland removal.
Where woodland is removed, compensatory planting will most likely be expected to be delivered.
The application is therefore not supported by NPF4 policy 6. 
5. The applicant has not fully addressed technical issues in relation to the proposed development,
namely it has not been demonstrated that the development can be undertaken without adverse
impact on European Protected Species (bats) nor has it been demonstrated that the issue of
noise has been suitably addressed in terms of noise from the nearby A80 but also that arising
from the established boarding kennels to the north east of the site. As such the development is
contrary to policies EDQ 1-3 Environmental and Design Quality Policies. 
Background Papers: 
Consultation Responses: 
NLC Traffic & Transportation dated 10th Feb 2023 
NLC Education dated 19th Sept 2023 
NLC Environmental Health (including Pollution Control) dated 
NLC Greenspace dated 20th Feb, 31st March and 5th Sept 2023  
NLC Housing Strategy 24th Jan 2023
NLC Play provision 4th April 2023 
Archaeological Services dated 17th Jan 2023
Historic Environment Scotland dated 20th Jan 2023
Transport Scotland dated 18th Jan 2023 
Contact Information: 
Mrs Kirsten Devlin at esplanning@northlan.gov.uk or 01236 632500 
Report Date:  2nd October 2023 
Page 22 of 146

Page 23

APPLICATION NO. 22/01493/PPP 
REPORT 
1. Site Description 
1.1 The site is located south of Bedlay Castle, Moodiesburn, along the northern extent of the A80
Cumbernauld Road, immediately adjacent to the northern carriageway of Cumbernauld Road
(A80) linking Moodiesburn to Chryston. It is characterised woodland dispersed residential
properties and agricultural farmland. The southern boundary is formed by what would appear to
be the stone estate boundary wall for Bedlay Castle beyond which is the A80. To the north and
east of the development site are two residential properties associated with Bedley Castle and
gardens. A third residential property lies adjacent to the site boundary (former gate lodge)
situated at the southwest corner. To the west of the development is the Bothlan Burn which runs
from the south at Gartcosh to the Luggie water in the north. 
2. Proposed Development 
2.1 Planning permission in principle is being sought for residential development on the eastern
periphery of Chryston. An indicative layout and access point has been provided which proposes
12 dwellings within a landscaped setting split between 6 Detached dwellings and 6 Cottage
flats. There is what appears to be a shared access from the A80 that the applicant includes
within the application site and indicates they have control over. However, a new and separate
access is proposed to serve the development site straight form the A80. 
2.2 While some design details have been provided in the supporting information, this has been to
assist assessment of the principle of development.  Matters of internal layout and design of the
site would still be subject to a further detailed planning application. 
3. Applicant’s Supporting Information 
3.1 The applicant has submitted the following information (along with some resultant follow-up
submissions) in support of their application: 
• Design & Access Statement
• Preliminary Ecological Appraisal
• Ground investigation Report (including Coal Mining Risk Assessment)
• Assessment of appropriateness
• Preliminary bat roost assessment and bat roost potential report.
• Flood Risk Assessment
• Protected species survey (Bats) 
• Preliminary roost assessment (Bats)
• Aboricultural impact assessment 
4. Site History 
4.1 There are no previous applications that are directly associated with the application site. 
5. Development Plan 
5.1 The Development Plan now consists of the North Lanarkshire Local Development Plan and the
National Planning Framework 4 (NPF 4). Upon its adoption on the 13th February 2023, National
Planning Framework 4 (NPF4) became part of the statutory ‘Development Plan’. It supersedes
both Scottish Planning Policy (2014) and the Clydeplan Strategic Development Plan (2017). As
a result, the Development Plan in respect of this site now comprises NPF4 (2023) and The North
Lanarkshire Local Development Plan (adopted 2022). On 8th February 2023, the Chief Planner
for Scotland published Transitionary Arrangements Guidance which set out further details
regarding how NPF4 should be applied. This confirmed that adopted Local Development Plans
will continue to be part of the development plan. In circumstances such as North Lanarkshire’s,
where the Local Development Plan has been adopted prior to publication of NPF4, legislation
Page 23 of 146

Page 24

states that in the event of any incompatibility between a provision of NPF4 and a provision of
an LDP, whichever of them is the later in date is to prevail. Accordingly, the proposed
development requires to be assessed against the provisions and policies of both NPF4 and The
North Lanarkshire Local Development Plan. 
5.2 When assessing this proposal for a residential development it is considered that the following 
NPF 4 Policies are of particular relevance: 
National Planning Framework (NPF) 4 
5.3 NPF4 policy 8 Greenbelt: 
This policy seeks to encourage, promote and facilitate compact urban growth and use the land
around our towns and cities sustainably and to ensure the following outcomes: 
• Development is directed to the right locations, urban density is increased and
unsustainable growth is prevented.
• The character, landscape, natural setting and identity of settlements is protected and
enhanced. 
• Nature networks are supported and land is managed to help tackle climate change. 
5.4 NPF4 policy 13 Sustainable Transport 
To encourage, promote and facilitate developments that prioritise walking, wheeling, cycling
and public transport for everyday travel and reduce the need to travel unsustainably. 
5.5 NPF4 policy 14 Design, Quality and Place 
This policy seeks to ensure that developments are of a good design that are not detrimental to
the amenity of surrounding area and are consistent with the 6 qualities of successful places –
Healthy, Pleasant, Connected, Distinctive, Sustainable and Adaptable. 
5.6 NPF 4 policy 15 - Local Living and 20 Minute Neighbourhoods 
This policy sets out that to establish this goal consideration will be given to existing settlement
pattern, and the level and quality of interconnectivity of the proposed development with the
surrounding area. 
5.7 NPF 4 policy 16 - Quality Homes 
This policy supports new homes on land allocated for housing in Local Development Plans and
sets out various requirements including, and not limited, to meeting local housing requirements,
providing or enhancing local infrastructure, facilities or services and improving the residential
amenity of the surrounding area. 
North Lanarkshire Local Development Plan (NLLDP) 
5.8 The following policies are relevant within the North Lanarkshire Local Development Plan: 
• PP4 Greenbelt 
• AD4 Amount of Development
• PROM LOC3 Housing Development Sites 
• C1 - Contributions to infrastructure
• EDQ 1, 2, 3 assess the Environmental and Design Qualities   
5.9 PP4 Greenbelt and AD4 Amount of Development 
This policy sets out that the council seeks to support developments for agriculture, forestry,
recreation, or developments that need a non-urban location. The purpose of the Green Belt is
to protect the setting of communities, support regeneration by directing growth to urban areas,
Page 24 of 146

Page 25

protect natural assets and provide a high-quality environment. Policy AD4 requires that housing
proposals support a Green Belt appropriate use. 
5.10 PROM LOC3 Housing Development Sites 
This policy sets out that the council will provide an effective housing land supply. The policy sets
out that sites that promoted as this will be brought forward through consideration of applications
for planning permission.   
In the event of a shortfall in the five-year effective Housing Land Supply being demonstrated (by
local authority area and/or Housing Sub-Market Areas), both brownfield and greenfield sites
may be granted planning permission where it is demonstrated that the following criteria are
satisfied: 
• the development will help to remedy the shortfall identified.
• the development will contribute to sustainable development. 
• the development will be in keeping with the character of the settlement and the local
area. 
• the development will not undermine Green Belt objectives; and, 
• any additional infrastructure required as a result of the development is either committed
or to be funded by the developer. 
5.11 CI Contributions to Infrastructure 
This policy sets out that the council will seek developer contributions for new developments that
individually or cumulatively generate a requirement for new or enhanced services or
infrastructure in respect of Affordable Housing, Education, Transport and Green Infrastructure,
Amenity Space and Play. 
5.12 Environmental and Design Quality Policies 
EDQ 1 – Site Appraisal
EDQ 2 – Specific Features for Consideration
EDQ 3 – Quality of Development 
These three polices consider the creation of a successful place or enhance existing places by
integrating successfully into the local area and avoiding harm to neighbouring amenity.  To do
this a range of criteria is listed within these polices which includes amongst other things aspects
of design, massing, materials, topography and aspects to protect the existing urban area and
its specific characteristics, assets and attributes.  They consider hazardous zones, utilities
infrastructure and management areas and look to promote biodiversity and the environment
whilst meeting the challenges of the climate change via suitable and safe access for all users to
promote sustainable public travel or for example the provision of electrical charge points where
the car is still a requirement. 
6. Consultations 
6.1 The following consultation responses have been received in respect of the application. 
NLC Traffic and Transportation recommended that the application be refused on Road safety
grounds providing the following reasoning: 
a) The proposed development would take access off the A80, which in this location is a local
distributor dual carriageway with a central grassed area, barrier and speed limit of 50mph.
It is not appropriate for a new residential development to take access via a standard major
/ minor type junction arrangement at this location. There is little or no scope to provide the
appropriate junction arrangement at this location. The proposed site access is
approximately 55m to the east of the end of the merge where the A752 joins the A80. A
proposed taper for left turns into new access appears to start within approximately 5m of
the end of the existing merge. The proposed access is located too close to the existing
merge. This would create a major road safety issue due to inadequate space for lane
change manoeuvres for drivers exiting and merge and drivers entering the development.  Page 25 of 146

Page 26

b) The proposed access would permit all movements which would require creating an opening
within the existing central reserve. This would result in vehicles exiting the site to turn right
crossing two lanes of eastbound traffic in order to join two lanes of west bound traffic, all of
which is travelling at 50mph. This would create a major road safety issue. 
c) Even if the access were to operate under a left-in / left-out arrangement, points 1a) and 1b)
would still apply 
NLC Greenspace Advise that the site lies within Moodiesburn Glen/ Bothlin Burn Bedlay Castle
a Site of Importance for Nature Conservation (SINC).
They comment that SINCs are protected under PROT A POLICY Natural Environment and
Green Network Assets and that planning permission will only be granted for proposals
potentially affecting Local Sites if it can be demonstrated to the Council’s satisfaction that there
will be no adverse impact or that any impacts can be mitigated in environmental terms relevant
to the impact. 
In terms of biodiversity, Greenspace Development requested further information in order to
determine what impact the development will have on the SINC. Additional information was also
sought in relation to protected species (bats) and as the SINC woodland is known to be home
to bluebell (Hyacinthoides non-scripta). Bluebell is a Scottish and Local biodiversity action plan
species. A further survey for bluebells during the growing season is needed. 
Green Space Development (Forestry and Access Manger) suggests that there should be a
buffer of 5m from the development and woodland that would extend from either Root Protection
Areas or drip line of existing trees – whichever is the greatest from the stem of the trees. Within
the buffer zone, no ground works of any kind should take place. This is recommended as a
planning condition should members be minded to approve the application.
In view of the above comments, a further report was provided by the applicant. Namely a
Nocturnal Bat Survey was undertaken and the following comments were received on 5th
September 2023 from Green Space.  
Bats
A nocturnal bat survey was undertaken in May and June 2023 to update existing information on
the presence of roosting bats within the development footprint. One tree (T4) a Horse Chestnut
was found to have to have a single summer non-breeding roost (Soprano pipistrelle bat). 
Commuting and Foraging
A total of 5 species of bat were recorded during the nocturnal surveys. However as foraging and
commuting surveys were not undertaken full details cannot be accessed. The survey report
states that: 
Further survey work will be required to identify the activity levels of foraging and commuting
bats within the site as well as species type to implement compensation and mitigation measures
as appropriate. Further data will provide suitable evidence to compile a biodiversity
enhancement plan for the safeguarding of regionally important species such as Noctule bat. As
a consequence, the residual effect post-mitigation is currently (unknown).
Greenspace Development also request that activity surveys are carried out to investigate
potential adverse impacts to commuting and foraging. Surveys should be spread out so as to
cover the early, mid and late part of the survey season. Greenspace Development also
recommends automated surveys are carried out. Recommended survey effort, as stated in Bat
Conservation Trust’s Bat Surveys – Good Practice Guidelines, must be followed.
Page 26 of 146

Page 27

All mitigation and recommendations within: Table 6.1. Requirements and Recommendations for
mitigating effects on identified ecological receptors must be taken forward.
The applicant was reluctant to undertake a Bluebell Survey as requested by Greenspace on the
basis that from their reading the legislation it appears Bluebells are only actually legally
protected from being dug up and sold, which is not the case here.  
As the impact of the development on European protected species (bats) has not been fully
addressed and this fact is reflected in the reasons for refusal.  If members were minded to
approve planning permission in principle the application would need to be continued to allow
this matter to be fully addressed.
Archaeology Although there the application does not have any designation it has been
indicated that the proposed development has the potential to damage previously unknown
archaeological remains and as such a condition should be placed on any approval requiring that
a written scheme of investigation should be submitted for approval and carried out prior to the
commencement of the development on the site should members be minded to approve. 
Historic Environment Scotland (HES) do not object in principle to the proposed development
of houses within land to the south of Category A listed Bedlay Castle. They comment that if
minded to approve members may wish to consider, as part of any planning conditions, requiring
additional planting to the north shelterbelt to reinforce that screening. It is HES view is that the
proposals do not raise historic environment issues of national significance and therefore they
do not object. However, they advise that decision not to object should not be taken as our
support for the proposals. This application should be determined in accordance with national
and local policy on development affecting the historic environment, together with related policy
guidance. 
Transport Scotland do not propose against the granting of permission. 
Local Housing Strategy comments that the Council’s Affordable Housing Policy seeks
provision of a proportion of affordable housing in the Cumbernauld Sub- Market Area as follows: 
• On sites capable of accommodating 25 or more dwellings, the developer will normally be
required to make on-site provision for 20% affordable dwellings integrated into the proposed
development. 
• For sites with a capacity of 5 to 24 units, a commuted sum equivalent to provision of 20%
affordable housing will be required; and 
• On-site provision means dwellings or serviced and accessible land within a housing
development are transferred or sold, taking account of land value for affordable housing, to an
appropriate social housing provider. This should generally be a Registered Social Landlord
(housing association) or North Lanarkshire Council, for development at an end use value for
affordable housing. 
In this instance, where site capacity is indicated as circa. 9 units, LHS preference is for the
affordable housing requirement to be met by way of a commuted sum payment, equivalent to
the provision of serviced land for 1 affordable housing unit (i.e., 20%). We would recommend
the Applicant makes contact with the New Supply team to confirm the proposed affordable
housing contribution. Members are advised that if minded to approve this application for
permission in principle a planning condition on this matter would be required. 
NLC Play Services: For all developments comprising 30 dwellings or more, there is a
requirement for on-site play provision or alternately a contribution from the developer towards
local off-site play provision. As this development consists of 12 dwellings, there is no
requirement for play provision. 
Page 27 of 146

Page 28

NLC Education: comments that the proposed development is situated within the catchment
areas of Chryston Primary and St Barbara’s’ Primary schools. Pupils from these schools transfer
to Our Lady’s High School, Cumbernauld, and Chryston High schools for secondary provision. 
The schools in the local area are experiencing capacity issues and any additional house building
in the area will add to the pressures in the local school estate. Agreement is in place for a new
build school to replace the current Chryston Primary school alongside increases to the
capacities of St Barbara’s Primary school and Chryston High school. 
In order to help mitigate the impact of this proposed development on the local school estate the
Service requests a developer contribution of £115,410.71. The contribution will help deal with
the impact on educational facilities in the area. The contribution calculation is based on the cost
of extending provision and proportionately distributed by the anticipated pupil yield per unit. 
NLC Education clarified that this cost was derived from an assessment of 12 units and so
averaging this out the contribution per dwelling is in the order of £9617.56. The applicant has
confirmed that if planning permission were to be granted they would be willing to meet the
required contribution and that this would be achieved by a S75 legal agreement. If members
were minded to grant planning permission in principle then permission would not be issued until
a legal agreement had been concluded. 
NLC Protective Services 
Advise that the applicant would have to provide a noise impact assessment for the proposed
development, for the effect of the road noise.  Given the close proximity of an established
boarding kennels there are also ‘agent of change’ implications here, and a thorough noise
impact assessment would have to be undertaken and reviewed in the normal course of things. 
It is also their understanding that we don’t condition outstanding noise considerations ahead of
a likely positive planning decision, due to the implications that such a material consideration can
then have further down the line (i.e. it should all be sorted out up front in such cases). 
Notwithstanding, in this case that the application is being recommended for refusal, we made
the applicant aware of the need for a noise assessment in the event that they wished to try and
resolve this technical matte. They confirmed that they wanted the application determined based
on the information submitted. Accordingly, the fact that noise, which is a material planning
consideration, has not been addressed is reflected in the reasons for refusal. If members were
minded to approve planning permission in principle, then the application would need to be
continued to allow this matter to be fully addressed.   
7. Representations 
7.1 Following the carrying out of the statutory notification and press advert 82 letters of
representation were received within the statutory period. These comments which included
submissions from Scotland’s Garden Landscape Heritage, Gillian MacKay MSP and Councillor
McLaren are summarised as follows: 
Planning policy & guidance
a) The application is contrary to Local Development plan policy. As has been previously
acknowledged by North Lanarkshire Council via its LDP 2022, the preservation of natural
green corridors is of strategic and local importance and the preservation of outdoor spaces
is a necessity. There are more than adequate proposed sites for new housing listed within
the Local Area plan, some reasonably local to this site. Bedlay is not one of them and so
the proposal is in breach of the local area plan.
b) The development fails to comply with Scottish Planning Principle.
c) The site impacts on a Historic Garden and Design Landscape Listing (as noted on the Local
Plan 2005) and also by the Garden Society has 'disappeared' protecting the setting of the
Castle.
d) The council should consider carefully their duty of care to their constituents and the
environment. As per their Environment Strategy: https://www.northlanarkshire.gov.uk/your-
Page 28 of 146

Page 29

council/council-strategies-and-plans/council-strategies/environment-strategy. A key focus is
"Improving the health and wellbeing of our communities".
e) The development would be in conflict with Planning Advice Notice 65 and government
guidance which instructs on the value of open space. 
Tree preservation order, trees and ecological & geological designation
a) The Impact on protected species within site and surrounding environments should be
considered. It is the responsibility of the Council to protect based on EU directive for the
sizeable Bat population and the Wildlife and Countryside Act 1981. Most notable are the
presence and obvious habitation of Water Voles, Bats and Badgers. Surveys should be
carried out for the site on Bat species, per current legislative framework and guidance
around EPS to planning authorities. As EPS have been observed/evidenced in the site, then
the status of the species and the effect of the development on the species must be
confirmed, before determining a planning application. It is also clear from the Scottish
Natural Heritage guidance, that suspensive conditions are also not allowed in the case of
EPS.  This in practice means that planning authorities are not able to approve a
development 'subject to Bat Surveys', and any developments that have these suspensive
conditions should be returned to the relevant planning authority.  This confirms my previous
statement that the facts around EPS have to be determined before a planning decision and
that this application is therefore non-compliant with legislation and guidance as it currently
stands as no specific Bat survey has been presented.
b) Deeds to the land under burden 4: The tree preservation order no.17 by county council of
county of Lanark under town and county planning (Scotland) Act 1947 recorded G.R.S.
(Glasgow) 23 march 1960, contains conditions affecting trees and groups of trees (including
prohibitions against cutting down, topping, lopping, wilful destruction &c. thereof). Mature
trees and tree clusters would be damaged in the process of building.
c) The Tree survey submitted as part of the application significantly devalues the site,
insinuating many of the trees are much younger than they are (as the owners of Bedlay
Castle can personally detest because they have lived here for many generations). The
report claims there are no ancient trees on site solely from a directory search of Woodland
Trust. Certain veteran trees on our boundary are still waiting to undergo an assessment by
the Woodland Trust to determine whether they should be officially classed as ancient trees. 
d) The surveyor was denied access to any boundary land owned by Bedlay Castle/Bedlay
Kennels, therefore assumptions have been made without ever having stepped foot onto the
surrounding grounds to assess in person. We insist an independent assessment should be
carried out to re-evaluate the grounds, particularly the trees surrounding the boundary.
e) In terms of Geology the rocky crag which this land sits upon are recognised as having
significant value and also has the potential to be recognised/reinstated as a site of special
scientific interest, having similar properties to the nearby SSSIs at Mollinsburn.
f) The field has an avenue of lime trees which are under a Tree Preservation order and form
part of an historic woodland landscape. The landscape provides mature habitat for
protected species of wildlife and plants. This includes bats, water voles and birds of prey
living in close proximity to the Bothlin Burn.
g) In terms of wildlife habitat and geology the estate, once carried SSSI status, the removal of
this designation without due consultation is also under investigation by adjoining
landowners. The sites importance as a green corridor for the reintroduction of pine martins
and red squirrels cannot be understated and the ecology report within the application
significantly downplays the habitat value and habitat connectivity the site holds.
h) No environmental impact assessment has been made of the site despite it covering 3 times
the necessary area, and the dramatic partial closure of the Greenbelt gap mentioned in
point 2, adding to the urbanisation of the area. 
i) The 'out of season' assessment on local flora and fauna leaves unreasonable gaps in the
ability to gauge the full impact of the development.
j) A working construction site may draw wildlife into a dangerous territory. 
Page 29 of 146

Page 30

Road safety
a) The proposed development would create a dangerous junction situated at a point where
cars have reached maximum acceleration to join the dual carriageway. This road layout is
already known for fatalities without adding further dangerous and ill-thought-out junctions.
In the past, numerous local dogs and a person on a bike have been killed on this section of
road, not to mention the numerous car accidents that occur here on a frequent basis simply
from cars leaving or entering the carriageway to enter Chryston on the already pre-existing
road. The proposed junction to be added here would be reckless, it would cause cars to
break and stop at the fastest point of the carriageway - and even if the plans were amended
by the developers to add a deceleration lane to allow for safe breaking to leave the
carriageway and enter the new development, this would be impossible to implement in line
with DMRB guidelines because there is inadequate space to build a suitable length
deacceleration lane whilst ensuring adequate space between the acceleration lane- unless
more of the historic wall and trees protected by the tree preservation order were to be
removed to accommodate a deceleration lane. In doing that, not only will it damage the
protected historical features and ecology of the site, but it would compromise the one and
only well-used public footpath connecting Chryston to Moodiesburn. Thus, putting more
adults and children, particularly children walking themselves to and from school, at risk of
being hurt or killed by vehicles at an already dangerous area of road, and that's without the
added dangers of increased traffic, cars breaking and turning in, and reduced footpath
space (if any would be left at all) beside this proposed site.
b) More detail is needed with regard to matters pertaining to Roads/Traffic, Public Transport. 
Housing supply in the local area and Loss of identity of existing settlement
a) The communities of Moodiesburn and Chryston have already lost significant and
irredeemable quantity and quality of greenspace to private housing developments of tenure
types unsuitable for local people, under the place principle these greenspace losses have
reduced place value and led to detriments of social health and community wellbeing.
b) The construction of so few houses on such a small site does not justify the destruction of
the historic environment around the listed buildings adjacent to the site, indeed it also
detracts from the environmental/historic context of Chryston Village itself and the positive
psychosocial effects on the local community of having access to open space in the area. 
Impact on local infrastructure
a) More building in the area is just adding to the detrimental effect that all the recent
development is already having on the health and well-being of the residents in this area.
The area is already overrun with families and children with no space in schools or doctors
or dentist surgeries. How is building MORE houses going to solve it. The Muirhead,
Chryston and Moodiesburn communities are already well overpopulated in terms of local
council services: the schools are over capacity (the new Chryston school being built on
Lanrig Road will only cover what they were already over limit for and does not take into
account new house builds such as this proposed housing plan); the GP surgeries cannot
take any more registered patients; most of the dog waste bins in the area were removed
months ago due to a lack of council funds for emptying them; public transport in the area is
scarce and unreliable, just to name a few of the many issues the community has faced. All
because of new and destructive housing developments being built over the years. The local
amenities, e.g. doctors/schools/dentists in Chryston/Moodiesburn, are already at full
capacity and trying to get an appointment is only getting harder and harder as more people
move into to the area into new development.
b) There should be a duty of care that favours existing residents and prioritises the
improvement of these services before they are made worse by adding further houses and
strain. There are already several new developments underway in Stepps, Moodiesburn,
Chryston and Gartcosh for new houses in the area so why are 6 more detached houses
justified? The primary school is already over-subscribed before it's even finished being built
due to the overpopulation of new builds and lack of suitable amenities and infrastructure.
Page 30 of 146

Page 31

c) The wildlife corridor / Strathkelvin Walkway is used for recreational pursuits within a
countryside setting.
d) Public transport in the area is very poor, Stepps and Chryston cannot cope with any more
developments due to its lack of amenities in the form of shops, schools and pharmacies.
We reached capacity long ago and this development with further ruin the once small towns. 
Planning procedure
a) Lack of attention to the planning process by the developer, specifically lack of notification to
neighbours it would directly affect. Bedlay Castle did not receive formal notification of these
proposals. Failure to inform neighbours within site boundary. Bedlay Castle did not receive
Near Neighbour Notification this is a Breach of Planning Law. Advised we are not within 20
metre boundary and would see press advert. 
Drainage
a) There is insufficiency in the information provided around sustainable drainage and the
impact of the development on the Bothlin Burn whose water whose water has been
recognised as being intrinsic to the recovery of freshwater habitat and riparian zone for the
wider Kelvin tributaries catchment. 
Pollution
a) The development would lead to increased noise, disturbance and light pollution which would
impact on wildlife in the area, in particular nocturnal wildlife.
b) Traffic generation - Increased volume of traffic, resulting in more congestion and air pollution
c) increased run-off contributing to risk of flooding.
d) Housing construction alters nutritional and biogeochemical cycles, enhances impervious
surfaces as well as the risk of fire and spreading pollutants.
e) Wastewater disposal and proximity to the Bothlin Burn. The plan shows that there is an
intention to have "sustainable drainage systems" in front of the houses. The closest of these
is only 80 metres from the burn. There appears to be little detail provided to NLC explaining
the methodology and safety of the water disposal system. Advice from SEPA ought to have
been obtained in this regard. Although the burn is considered to be within the "buffer zone"
no attempt has been made to carry out a wildlife survey and an impact assessment as to
the effect on the Bothlin Burn of these drainage systems. Are there, in fact, water voles?
Bothlin Burn, another protected site, at risk of water pollution. 
Impact on local businesses
a) Our dog day care business is licensed by North Lanarkshire Council to care for up to 50
dogs per day. Our dogs have accessed our secure grounds all the way up to the boundary
fence of the proposed site (less than 20m away from the proposed new build houses &
gardens). With this number of dogs on site, it should be expected that we generate a great
deal of noise - any buyers of these proposed houses would experience the frustration of
living next door to this noise. This would not benefit the future homeowners, nor does it
benefit our business. This would be extremely stressful for both parties. Therefore, again,
further consideration should be made in line with the 'Agent of Change' Principle Introduced
by the Planning (Scotland) Act 2019. 
Built Heritage
(Archaeology)
a) Despite being in close proximity to 3 historic and listed buildings, no archaeological
assessment of the site has been made. 
Page 31 of 146

Page 32

(Listed building)
b) The site is near historic A listed castle and B listed Garden house/estate offices. The
creation of modern housing would taint the visual and physical qualities of the already built
structures. This is an unnecessary development which encroaches on the Northern
Corridor's most important cultural and historical asset, the Bedlay Estate and its environs. 
Setting- matters of archaeology, heritage & the sense of place of Bedlay Castle
c) What is clear upon closer examination is that the area immediately to the south of the castle
is shown surrounded by a red line, indicating that it was walled, potentially the location of
the formal walled garden area. Most of the houses shown on the application fall into this
area, which compromises the sense of place of Bedlay castle. attention should be taken to
the 19th century mausoleum of James Campbell of Petershill which stood "in a clump of
trees...in the lawn" that could conceivably lie within the area proposed for development.
Overall, from a historical perspective, the development of the policies of the castle into
housing should be avoided since it would detract from the setting of the locally important
castle. No proper consideration has been given by the developer with regard to the historic
character and sense of place of the landscape around the castle.
d) Communities separated by the greenbelt are gradually closing together with lose of identity,
this must be protected. The walkway will increase in significance as the seven lochs project
is developed with its recreational link and opportunities for the historical / nature/educational
use of this area.
e) During the 16/17 century the Boyd family built a mausoleum which stood until the 1800s on
the fields that are being put forward for housing. There is a pillar in the field marking where
the mausoleum once sat. Local history should not be erased for quick profit.
f) Scotland’s Garden and Landscape Heritage consider that the proposal will cause an
unacceptable level of harm to this locally significant historic designed landscape as a result
of irreversible development in the historic parkland, removal of established tree cover, the
creation of a new access damaging the southern perimeter wall and potential detrimental
visual impact on Category A-Listed Bedlay Castle. 
Formal designations and policy
a) Recent examinations by the DPEA have identified no shortage of available land for housing
within the Northern Corridor or indeed within the wider Cumbernauld Sub Housing Market
Area.
b) The site proposed lies within an area recognised in the 2005 local development plan as
being designated Historical Garden and Designed Landscape. The removal of this
designation is currently under investigation.
c) The site contains architectural monuments and a Mausoleum, which as yet have not been
fully investigated by the relevant authorities, although plans are already underway to rectify
this and also to have areas of the local estate if possible, added to the Ancient Woodland
inventory.
d) Ancient semi-natural woodland is an irreplaceable resource and, along with other
woodlands, hedgerows and individual trees, especially veteran trees of high nature
conservation and landscape value, should be protected from adverse impacts resulting from
development. Scottish Planning Policy on Ancient Woodland source: Nature.scot 
Miscellaneous
a) Development denies carbon footprint for financial gains.
b) Development would set a precedent against approved NLC greenbelt policy allowing other
applications to argue a case.
c) Water tables and wind direction may adversely affect the established trees protected by
TPO.
d) The ecology report submitted with the proposal contains significant deviations from the
Ecology report for the larger parcel of land adjoining which was submitted at the call for Page 32 of 146

Page 33

sites stage and the council will have records of this as the developer submitted the report
and call for sites’ submission as an objection to the Main Issues Report. Comparing the two
and noting the significant redactions indicates the requirement for an independent survey
to protect this vital habitat.
e) Having looked at the constraints why has this application even being considered.
f) The DPEA have identified other available land, why is this not being utilised?
g) There is no benefit to more housing in an already overwhelmed area, especially the building
of 6 luxury detached houses that will sell for more than the average working person can
afford in this area. There is no shortage of luxury homes in North Lanarkshire the community
would benefit from more amenities instead.
h) Would it not be a great idea if you all took a drive through North Lanarkshire to see if you
can count the many potholes on our roads and side roads and possibly use some cash to
sort that mess out.
i) Destruction and upheaval, on the roads. We have had enough of temporary lights,
roadworks etc.
j) There are no facilities similar to the Tryst or Broadwood for residents of Moodiesburn. 
8. Planning Assessment 
8.1 In accordance with Section 25 of the Town and Country Planning (Scotland) Act 1997, planning
decisions must be made in accordance with the development plan unless material
considerations indicate otherwise. Subject to suitable restrictions on the extent and nature of
the development, it is considered that the proposal raises no issues of a strategic nature. The
Development Plan comprises the North Lanarkshire Local Development Plan (NLLDP) and the
National Planning Framework 4 (NPF 4) with NPF prevailing over any NLLDP policies that are
incompatible with its aims and objectives.   
8.2 National Planning Framework 4 (NPF4): 
The introduction of NPF4 in February 2023 requires that these policies be taken into account in
assessing all developments. The most appropriate of these are discussed below. 
8.3 NPF4 policy 8 Greenbelt 
This policy seeks to encourage, promote and facilitate compact urban growth and use the land
around our towns and cities sustainably based on the compact city model. The NPF4
requirements for development are compatible with that of the local development plan which
requires greenbelt development of a residential nature be for the use of someone employed in
the immediate vicinity or that there is the reuse of an existing structure. Neither of which is
applicable in this case. 
a) Development proposals within a green belt designated within the LDP will only be supported
if: 
i) they are for: 
• development associated with agriculture, woodland creation, forestry and existing
woodland (including community woodlands); 
• residential accommodation required and designed for a key worker in a primary industry
within the immediate vicinity of their place of employment where the presence of a
worker is essential to the operation of the enterprise, or retired workers where there is
no suitable alternative accommodation available.
• horticulture, including market gardening and directly connected retailing, as well as
community growing. 
• outdoor recreation, play and sport or leisure and tourism uses; and developments that
provide opportunities for access to the open countryside (including routes for active
travel and core paths); 
• flood risk management (such as development of blue and green infrastructure within a
“drainage catchment” to manage/mitigate flood risk and/or drainage issues).
• essential infrastructure or new cemetery provision.
Page 33 of 146

Page 34

• minerals operations and renewable energy developments.
• intensification of established uses, including extensions to an existing building where
that is ancillary to the main use.
• the reuse, rehabilitation and conversion of historic environment assets; or 
• one-for-one replacements of existing permanent homes. and 
ii) the following requirements are met: 
• reasons are provided as to why a green belt location is essential and why it cannot be
located on an alternative site out with the green belt. 
• the purpose of the green belt at that location is not undermined. 
• the proposal is compatible with the surrounding established countryside and landscape
character.
• the proposal has been designed to ensure it is of an appropriate scale, massing and
external appearance, and uses materials that minimise visual impact on the green belt
as far as possible; and 
• there will be no significant long-term impacts on the environmental quality of the green
belt. 
The applicant’s supporting information comments that the site is part of the Bedlay castle estate
and therefore represents an intensification of an existing residential use. No commentary is
provided on the principle policy Green Belt where the current use is not residential. The
application therefore represents a residential development in the green belt which does not
comply in any respect to the above policy criteria. 
8.4 NPF4 policy 13 Sustainable Transport 
To encourage, promote and facilitate developments that prioritise walking, wheeling, cycling
and public transport for everyday travel and reduce the need to travel unsustainably. 
This development does not directly promote sustainable transport and no supporting information
has been submitted evidencing that it is located on an established bus route with the nearest
rail station being Stepps and therefore not within acceptable walking distance. It would therefore
appear that this development is entirely dependent on private vehicles. 
NPF Policy 6 Forestry, woodland and trees 
a) Development proposals that enhance, expand and improve woodland and tree cover will
be supported. 
b) Development proposals will not be supported where they will result in:
• Any loss of ancient woodlands, ancient and veteran trees, or adverse impact on their
ecological condition; 
• Adverse impacts on native woodlands, hedgerows and individual trees of high
biodiversity value, or identified for protection in the Forestry and Woodland Strategy;
• Fragmenting or severing woodland habitats, unless appropriate mitigation measures
are identified and implemented in line with the mitigation hierarchy;
• Conflict with Restocking Direction, Remedial Notice or Registered Notice to Comply
issued by Scottish Forestry. 
c) Development proposals involving woodland removal will only be supported where they will
achieve significant and clearly defined additional public benefits in accordance with relevant
Scottish Government policy on woodland removal. Where woodland is removed,
compensatory planting will most likely be expected to be delivered. 
d) Development proposals on sites which include an area of existing woodland or land
identified in the Forestry and Woodland Strategy as being suitable for woodland creation
will only be supported where the enhancement and improvement of woodlands and the
planting of new trees on the site (in accordance with the Forestry and Woodland Strategy)
are integrated into the design. 
No proposals have been forwarded that will achieve significant and clearly defined additional
public benefits in accordance with relevant Scottish Government policy on woodland removal.
Page 34 of 146

Page 35

Where woodland is removed, compensatory planting will most likely be expected to be
delivered. The application is therefore not supported by NPF4 policy 6. 
8.5  NPF4 policy 14 Design, Quality and Place 
This policy seeks to ensure that developments are of a good design that are not detrimental to
the amenity of surrounding area and are consistent with the 6 qualities of successful places –
Healthy, Pleasant, Connected, Distinctive, Sustainable and Adaptable 
The site currently makes a positive impact on the green belt adding considerable character to
the area and a clear and robust separation of the settlements of Chryston and Moodiesburn. As
indicated above it is considered that the natural boundary of the urban area is the settlement
edge. 
Policy 14 also looks to ensure that the residents within a development have a pleasant place to
live. Locations such as this could provide this however in this instance the quality of the
greenbelt in this location also requires to be given due consideration. It is considered that the
loss of this area would be detrimental to the buffer that this greenbelt provides between two
distinct settlements separated by established woodland and a riparian corridor. 
8.6 NPF 4 policy 15 - Local Living and 20 Minute Neighbourhoods 
This policy sets out that to establish this goal consideration will be given to existing settlement
pattern, and the level and quality of interconnectivity of the proposed development with the
surrounding area. In respect of proximity to local services it should be noted that the entrance
to the site is approx.  0.77km distant from the edge of Chryston local centre and 1.4km from the
shops in Moodiesburn. Access to both would involve walking alongside the A80 for at least part
of the way. 
8.7 NPF 4 policy 16 - Quality Homes 
This policy supports new homes allocated on land allocated for housing in Local Development
Plans and sets out various requirements including and not limited to meeting local housing
requirements, providing or enhancing local infrastructure, facilities or services and improving
the residential amenity of the surrounding area.  The policy also indicates that new homes on
land not allocated for housing in the LDP will only be supported in limited circumstances (see
below). 
As we are dealing with a site not allocated for housing in the NLLDP a very recent appeal
decision for a site in West Lothian by the Scottish Ministers (19 July 2023) reference PPA-400-
2118 may be considered relevant (decision subject to an ongoing challenge in the court of
session). The Ministers appeal decision was clear that all branches of NPF4 Policy 16 (f) need
to be taken into account, not just point (i), full policy 16 (f) states: 
(f) Development proposals for new homes on land not allocated for housing in the LDP will only
be supported in limited circumstances where: 
i. the proposal is supported by an agreed timescale for build-out; and 
ii. the proposal is otherwise consistent with the plan spatial strategy and other relevant
policies including local living and 20 minute neighbourhoods; 
iii. and either: 
· delivery of sites is happening earlier than identified in the deliverable housing land
pipeline. This will be determined by reference to two consecutive years of the Housing
Land Audit evidencing substantial delivery earlier than pipeline timescales and that
general trend being sustained; or 
· the proposal is consistent with policy on rural homes; or 
· the proposal is for smaller scale opportunities within an existing settlement boundary;
or 
· the proposal is for the delivery of less than 50 affordable homes as part of a local
authority supported affordable housing plan. 
Page 35 of 146

Page 36

In terms of the above policy members should note the following comments: 
i. There is no agreement on such a timescale.
ii. Housing is not consistent with the spatial strategy, set by NLLDP Policy PP4 Green Belt.
Neither (i) nor (ii) is met and NPF4 clearly states both have to be met.
iii. The 10-year MATHLR set for North Lanarkshire at NPF4 Annex E of 7,350 is
comfortably exceeded by the latest 7-year programmed Housing Land Audit, so there
is no early delivery of sites that points to this site being appropriate. 
In addition, to the above it should also be noted that in the recently published Scottish Borders
Local Development Plan 2 Report of Examination, in Particular Conclusion 63 adds further
clarity on housing land.  This states “NPF4 no longer states the need for a five-year effective
land supply. All comparisons with that measurement are, therefore, now irrelevant…” 
8.8 In conclusion, it is considered that NPF4 offers no support for the development sufficient to lead
to a grant of planning permission in principle on this green belt site.   
Local Development Plan: 
8.9 PP4 Greenbelt and AD4 Amount of Development 
These policies set out that the council seeks to support developments for agriculture, forestry,
recreation, or developments that need a non-urban location. The purpose of the Green Belt is
to protect the setting of communities, support regeneration by directing growth to urban areas,
protect natural assets and provide a high-quality environment. Policy AD4 requires that
housing proposals support a Green Belt appropriate use. 
The development under consideration does not require to be situated in a non-urban location,
such as forestry, agriculture etc. It is noted that the boundary runs along the edge of the
general urban area however should this development go ahead it is considered that
detrimental impact on this narrow section of the greenbelt which maintains a robust boundary
between Chryston and Moodiesburn. It is therefore considered that the proposed development
is contrary to Policy PP4 and AD4. 
8.10 PROM LOC3 Housing Development Sites 
Following on from para 8.7 above, through the West Lothian appeal decision Ministers
confirmed the application of housing policy in relation to development on sites that are not
designated for a residential use. The decision stated that the West Lothian Local Plan Policy
HOU2 was an exceptions policy and has been replaced by NPF4 Policy 16 (f). In terms of how
this applies to this application in Chryston, it is considered that PROM LOC 3 (Housing
Development Sites) is almost identical in function, purpose and content regarding exceptions
as the HOU2 policy in West Lothian. Therefore, this application also needs to be determined
using NPF4 Policy 16 (f) and not PROM LOC 3.  As indicated above this decision is also subject
to ongoing legal challenge through the court of session. 
Of further relevance to consideration of this matter is Conclusion 63 in the recently published
Scottish Borders Local Development Plan 2 Report of Examination. This states “NPF4 no longer
states the need for a five-year effective land supply. All comparisons with that measurement
are, therefore, now irrelevant…” 
Notwithstanding the above, prior to the above court of session decision being issued, for
information purposes the proposal has been considered against policy for PROM LOC3 from
the NLLDP. 
Policy PROM LOC 3 indicates that through this policy the Council will provide a generous supply
of land to maintain a 5 year minimum effective housing land supply. It also indicates that any
sites proposed outwith the paramateres of policy PROM LOC 3 will only be supported if they
accord with other policies in the plan and policy PP4 (Green belt) is identified. The policy does
indicate that, in the event of a shortfall in the 5 year effective land supply being demonstrated,
both brown field and green field sites may be granted permission where it is demonstrated that
the following criteria have been satisfied:
Page 36 of 146

Page 37

a. the development will help to remedy any shortfall identified; 
Comment: The Council maintains the view that there is no shortfall, and that the current
Housing Land Supply position, based on the following considerations, is sufficient. 
The Council considers that following the Adoption of North Lanarkshire Council’s Local
Development Plan (July 2022) and the publication of National Planning Framework 4 (NPF
4,  February 2023), the emerging and finalised replacement housing land requirements for
each Local Planning Authority have been set and now laid out in Annex E of NPF 4. 
The Reporter in his examination report of the NLLDP has specifically instructed North
Lanarkshire Council (NLC) to review the adequacy of its housing land supply against the
finalised MATHLR. NLC’s 10-year Minimum All-Tenure Housing Land Requirement is 7,350
units. 
NLC’s Finalised 2022 Housing Land Audit is the most up to date position on the Council’s
housing land supply and has been extrapolated to 10 years by including the non-effective
element of effective sites to 2031. 
NLC’s 10-year All-Tenure housing land supply, as derived from the 2022 Finalised HLA, is
11,632 units. This is roughly 58% more than NLC’s MATHLR figure, demonstrating that there
is sufficient housing land available across the Local Authority area. 
b. the development will contribute to sustainable development. 
Comment: The site is adjacent to the urban area and nearby infrastructure, including
schools and public transport, however this requires to be balanced against the impact that
the proposed development will have on the wider area and the impact on the green belt.
The green belt is narrow at this point between the settlements Chryston and Moodiesburn
and as such the development would have a significant and adverse impact. 
c. the development will be in keeping with the character of the settlement and the local area; 
Comment: the proposal put forward is only in principle and as such only indicative details
have been provided for consideration at this point. The information provided does indicate
that the development would be relatively low density. Notwithstanding this however the
proposal would be at odds with the protection of the character of the green belt through the
removal of a section of the green belt and the introduction of contemporary development
with the landscape and built heritage of the location. 
d. the development will not undermine Green Belt objectives 
Comment: The objectives of the Greenbelt policy is to support uses that require a non-
urban location and this is not such a use as housing can be accommodated within the
urban area. This is not such a development and as discussed above even this small
development would have a large and adverse impact on this narrow section of greenbelt. 
In terms of coalescence although this development would not join together the two urban
areas, it would be a noticeable urban addition and erode this important section of the green
belt, with the potential to set a president for future proposals of this nature. 
e. any additional infrastructure required as a result of the development is either committed or
to be funded by the developer 
Comment: As part of the process of assessment other NLC services have been consulted
to gauge the impact of the development on the surrounding community services. In this
instance there is a requirement for contributions from the developer has been identified for
affordable housing policy compliance and also for education contributions 
In conclusion with regards to housing need, regardless which policy applies i.e. from NPF4 or
the NLLDP there is no support for the development of this important green belt site.  Even if
Page 37 of 146

Page 38

there was a demonstrated shortage of housing land this development would not provide a
meaningful contribution such that it warranted allowing development of this green belt site. 
8.11 CI Contributions to Infrastructure 
NLC Local Housing Supply preference is for the affordable housing requirement to be met by
way of a commuted sum payment, equivalent to the provision of serviced land for 1 affordable
housing unit (i.e., 20%). They recommend the Applicant makes contact with the New Supply
team to confirm the proposed affordable housing contribution. Members are advised that if
minded to approve permission in principle an appropriate planning condition would be required. 
NLC Education: comments that the proposed development is situated within the catchment
areas of Chryston Primary and St Barbara’s’ Primary schools. Pupils from these schools transfer
to Our Lady’s High School, Cumbernauld, and Chryston High schools for secondary provision. 
The schools in the local area are experiencing capacity issues and any additional house building
in the area will add to the pressures in the local school estate. Agreement is in place for a new
build school to replace the current Chryston Primary school alongside increases to the
capacities of St Barbara’s Primary school and Chryston High school. 
In order to help mitigate the impact of this proposed development on the local school estate this
Service requests a commuted sum of £115,410.71. intended to mitigate the impact of the
development on educational facilities in the area. The contribution calculation is based on the
cost of extending provision and proportionately distributed by the anticipated pupil yield per unit. 
The applicant has been asked whether or not they would be willing to meet the required
education developer contribution which averages out at £9617.56 per dwelling and they have
confirmed that they would be willing to do so if permission in principle were to be granted. 
Therefore, should members be minded to approve planning permission in principle, the
permission would not be issued until a s75 legal agreement had been concluded which would
ensure the required contribution per dwelling is made on submission of any further applications. 
It is considered that the requirements of this policy could be complied with. 
8.12 Environmental and Design Quality Policies 
EDQ 1 – Site Appraisal
EDQ 2 – Specific Features for Consideration
EDQ 3 – Quality of Development 
These three polices look for proposed developments to create a successful place or enhance
existing places by integrating successfully into the local area and avoiding harm to neighbouring
amenity.  To do this a range of criteria is listed within these polices which includes amongst
other things aspects of design, massing, materials, topography and aspects to protect the
existing urban area and its specific characteristics, assets and attributes.  They consider
hazardous zones, utilities infrastructure and management areas and look to promote
biodiversity and the environment whilst meeting the challenges of the climate change via
suitable and safe access for all users to promote sustainable public travel or for example the
provision of electrical charge points where the car is still a requirement.   
a. Establishing a clear vision for the site with design principles which lead to the creation of a
distinct, successful place. The application under consideration is in principle and as such a
number of the design elements do not require to be provided. Notwithstanding this some
information has been provided in order to assess potential impacts by the proposal. This
includes the site access with detailed information provided in connection with this element.
NLC Traffic and Transportation have provided comments and have indicated that the
application should be refused for reasons set out above. 
b. Providing a safe, pleasant, inclusive, convenient and welcoming development: In referring
to NLC Roads comments above it should be noted that a recommendation to refuse the
access and junction arrangements on road safety grounds is material. 
Page 38 of 146

Page 39

c. Moving towards a low-carbon economy, addressing, resource efficiency, Mitigation of and
Adaptation for the effects of Climate Change energy and waste issues in order to create a
sustainable development with a low ecological footprint. The detailed design of the
dwellings in relation to massing and materials etc has not been provided at this stage and
would be part of any future detailed application as required should members be minded to
approve this application. That said the location of the proposed development is contrary to
the sustainable aims of NPF 4 in promoting compact city model of development. 
e.  Mitigating any likely air quality, noise, or pollution impacts particularly in or adjacent to Air
Quality or Noise Management Areas. With the exception of noise matters which have not
been resolved no significant issues have been identified as part of the consultation process. 
f. Ensuring that water body status is protected. The proposed site is located to a watercourse
designated as a Site of Interest for Nature Conservation (SINC) which is not under the
ownership of the applicant. The site under consideration is not designated as but has the
potential to impact the adjacent SINC. The information available has been assessed by
NLC Greenspace which indicates that overall, the site itself does not contain any ecology
to be preserved. Overall, should members be minded to approve the application conditions
on Sustainable urban drainage should be applied in accordance with current SEPA
guidance. 
h. Existing features of Green Network or Historic Environmental interest or Resources,
protected under the terms of the Protect Assets Policies, and including features (e.g.
traditional stone buildings/structures) identified through the site appraisal required by Policy
EDQ 1, will be safeguarded or enhanced. It is accepted that the site is near historic A listed
Bedlay Castle and B listed Garden house/estate offices. It is noted that HES acknowledges
that the site is likely to have been within the parkland associated with the castle but it no
longer forms part of the policies (the site has been sold off separately).  It is considered
that the development of modern housing in this green belt location would have an adverse
impact on the area in general and it is noted that local perception as (evidenced in the
letters of objection) is that this would also impact on the setting of these listed buildings. 
Whilst HES do not share this view, clearly local residents are of the view that the selling off
of the application site does not mean that it no longer reads as part of the Parkland
associated with the castle. There is some sympathy of this view given that the site is
bounded by mature trees and an old estate stone wall.  It is view of the planning service
that the building of houses on this important green belt site would have an adverse impact
on the character of the area as well as undermining the purpose of the green belt. 
On balance the application does not comply with the provisions of development quality policies
above and furthermore there is no support for the development in the policies of the NLLDP that
would indicate planning permission in principle should be granted.   
Assessment of Consultations: 
8.13 Potential Contaminated Land 
A site investigation has been submitted at the principle stage with comments requested from
the Council’s protective services. Initial comments may be conditioned should members be
minded to approve and along with this if required a remediation strategy would require to be
submitted to ensure that the area is suitable for residential use prior to the commencement of
development. 
8.14 NLC Greenspace 
In terms of the comments made by NLC Greenspace: 
a. Appropriate conditions could be placed on any approval to ensure that appropriate
measures are undertaken to protect the SINC.
b. In addition tree protection replacement measures should also be placed on any approval
along with appropriate planting. 
Page 39 of 146

Page 40

However, it is acknowledged that the applicant has not fully resolved the protected species
issues (relating to bats) and this has been reflected in the reasons for refusal 
Response to Representations: 
8.15 In response to the grounds of representation, these are summarised as follows and the
respective responses should be noted: 
Planning policy & guidance
a) The development is contrary to the development plan. This is discussed in section 8 of the
report.
b) Scottish Planning policy has been superseded by National Planning Framework 4 (NPF4)
as set out in section 8 of this report.
c) The environment Strategy is carried in the relevant policies relating to the assessment of
this application as set out in section 8 of this report.
d) While the impact generally is discussed in relation to setting the application is not covered
by a designated landscape policy. Build heritage is discussed in section 8 of the report.
e) Planning Advice Notice 65 (planning and open space) is guidance and is taken into
consideration where appropriate in the assessment of planning applications. 
Tree preservation order, trees and ecological & geological designation
a) The impact on protected species and habitat is considered in section 6 of this report.
b) The entire site is covered by a tree preservation order and would therefore require the
submission of an application for tree works or tree removal within the provisions statutory
requirements should members be minded to approve the application. If permission in
principle were to be granted it would need to be recognised that some protected trees would
need to be felled. 
c) The tree survey submitted is accepted as part of the assessment of this application. There
are currently no ancient woodland designations on this site.
d) The application supporting information is sufficient in order to determine the setting of the
development at the principle application stage.
e) There are no geological specific protective designations approved within the site.
f) The impact on protected species and habitat is considered in section 6 of this report.
g) Should members be minded to approve a screening response under the environmental
regulations may be submitted in accordance with the Regulations on environmental impact
assessment. 
h) The submitted ecology report has been accepted and is discussed in section 6 of the report.
i) A working construction site will under usual circumstance displace wildlife. 
Road safety
a&b) The access and transportation arrangements are discussed in section 6 of the report.
Housing supply in the local area and Loss of identity of existing settlement
a) All developments whether allocated sites through the Local Development Plan process or
in the case of this proposal are subject to the provisions of the Planning Act which sets out
the processes whereby policies are set out for consideration. All developments whether
approved by the planning committee or on appeal or refused have been subject to these
provisions.  In this case policies set out the Council’s position on protecting and supporting
development in the Green Belt as the starting point for assessment along with other material
considerations. 
b) The assessment of this application against relevant planning policies on housing supply,
green belt etc is set out in section 8 of the report. 
Page 40 of 146

Page 41

Impact on local infrastructure
a&b) The impact on housing land supply is considered through the local plan process and takes
account of changes in the local population. The impact on local infrastructure is taken into
consideration where sites are allocated in the Local Development Plan. Where sites are
unallocated applications are subject to assessment which includes consultation with the
Education Service. The expansion of medical provision is principally a matter for those services
through the local development plan process.
c) The Strathkelvin walkway route follows the John Muir Way from Kirkintilloch, skirting the
towns of Milton of Campsie and Lennoxtown and on to Strathblane and lies within the
neighbouring local authority area. It is therefore not clear what impact will result from this
development.
d) Public transport is provided by others 
Planning procedure
a) Given that over 80 objections were received following the notification process the Planning
Service is satisfied that the procedure was carried our successfully. 
Drainage
a) The application is in principle, and should members be minded to approve a suitable
condition will be attached to and subsequent matters specified application to bring forward
a sustainable urban drainage system in line with Scottish Environment Agency guidelines. 
Pollution
a) Should members be minded to approve this application a further detailed application should
consider any increased noise, disturbance and light pollution which would impact on wildlife
in the area once the final layout has been submitted.  The issue of noise has not been fully
resolved and this is reflected in the reasons for refusal
b) Should members be minded to approve this application a condition covering flood risk
assessment based on the final layout will be recommended
c) In considering Protective Services guidance the increase in the number of proposed
dwellings in the indicative layout would not be significant in terms of air pollution.
d) Should members be minded to approve this application a condition covering site
investigation and potential ground contamination will be recommended.
e) The application is in principle and should members be minded to approve a suitable
condition will be attached to and subsequent matters specified application to bring forward
a sustainable urban drainage system in line with Scottish Environment Agency guidelines. 
Impact on local businesses
a) The nearby dog day care business for up to 50 dogs per day is an accepted green belt use
given the propensity to generate a great deal of noise. Therefore, residents of the proposed
houses would experience significant disturbance living next door to this noise. This would
represent a significant loss of amenity for future homeowners, as well as impacting on the
business. As such both activities are in direct conflict with no identified mitigation in line
with the 'Agent of Change' Principle Introduced by the Planning (Scotland) Act 2019 and
are therefore incompatible at this location. The fact that this matter has not been fully
resolved in reflected in the reasons for refusal.
Built heritage
(archaeology)
a) Should members be minded to approve the application a planning condition covering
potential archaeology is recommended.  
Page 41 of 146

Page 42

(Listed building)
b) It is accepted that the site is near historic A listed castle and B listed Garden house/estate
offices. It is noted that HES acknowledges that the site is likely to have been within the
parkland associated with the castle but it no longer forms part of the policies (the site has
been sold off separately).  It is accepted that the development of modern housing in this
green belt location would have an adverse impact on the area in general and it is noted that
local perception as (evidenced in the letters of objection) is that this would also impact on
the setting of these listed buildings.  Whilst HES do not share this view, clearly local
residents are of the view that the selling off of the application site does not mean that it no
longer reads as part of the Parkland associated with the castle. There is some sympathy of
this view given that the site is bounded by mature trees and an old estate stone wall.  It is
view of the planning service that the building of houses on this important green belt site
would have an adverse impact on the character of the area as well as undermining the
purpose of the green belt. 
Setting- matters of archaeology, heritage & the sense of place of Bedlay Castle
c) It is agreed that the development of this prominent and important green belt land within the
former policies of Bedlay Castle is undesirable  
d) It is accepted that development in the Green belt at this location would have a significant
adverse impact and would contribute to coalescence of settlements.
e) Should members be minded to approve the application a planning condition covering
potential archaeology is recommended.
f) Whilst noting HES are not objecting to the development in terms of its impacts on Bedlay
Castle as indicated above it is apparent that this view is not shared by the many objectors
to the proposed development.  It is accepted that the building of houses on this important
green belt site would have an undesirable impact on the character of the area   
Formal designations and policy
a) It is agreed that the site is not allocated for housing development.
b) The site is currently not currently a designated landscape by Historic Environment Scotland. 
c) Should members be minded to approve the application a planning condition covering
potential archaeology is recommended. Members should note that the record does not
indicate the site being an area of Ancient Woodland.
d) While trees are protected on this site by Tree Preservation Order Members should note that
the record does not indicate the site being an area of Ancient Woodland. 
Miscellaneous
a) Land use planning policy seeks to direct development to sustainable places while
considering liveable places and productive places through policies set out in NPF 4.
b) All developments should be assessed on the merits of each individual application.
c) It is accepted that water tables and wind direction may adversely affect the established trees
protected by TPO.
d) Both reports are written for different reasons and at differing periods but both cover the
required information for the process for which they were intended.
e) The Planning Service has a duty to consider all valid planning applications submitted.
f) The DPEA have identified other available land as part of the Local Development Plan
Process this is an unallocated site.
g) The proposed development is not for civic amenities but a residential development in
principle. The proposed house type is therefore indicative and subject to market as with all
private house building.
h) The planning service does not consider road surface repairs over the road network in North
Lanarkshire.
i) Most development brings a level of temporary traffic disruption in order to implement the
development this is usually reasonably managed. Page 42 of 146

Page 43

j) This is a planning application for a residential development which does not consider leisure
facilities. 
9. Conclusion 
9.1 The relevant legislation requires that planning application decisions are made in accordance
with the relevant development plan unless material considerations indicate otherwise. In this
case it is recommended that the application be refused for the following reasons: 
9.2 The proposal is contrary to the green belt policies contained in NPF4 and the Local Development
Plan as it would result in the erosion of a valuable area that helps to define the settlements of
Chryston and Moodiesburn, contributing the character of the area. The proposed development
does not comply with either of these polices and constitutes an unacceptable form of
development within the green belt. The proposal does not comply with the environmental and
design quality policies of the local development plan as the arrangements for the access cannot
be adequately achieved creating an unacceptable detrimental impact on road safety.
Information has not been provided to allow protected species or noise issues to be addressed
and resolved. 
9.3 If the committee were minded to approve planning in principle the permission would not be
issued util a legal agreement covering education contributions has been concluded. 
Page 43 of 146

Page 44

Application No:  
23/00385/FUL
Proposed Development: 
Two semi detached dwellinghouses 
Site Address: 
Land South Of
Heatheryford Gardens
Plains 
Date Registered: 
27th April 2023 
Applicant:
Mr Alan  Wilson
Modern Housing Limited
166 Park Street
Motherwell
ML1 1PF 
Agent:
N/A
Application Level:
Local Application 
Contrary to Development Plan:
No
Ward:   
08 Airdrie North 
Alan Beveridge,Sophia Coyle,Henry Emerson
Dunbar,Richard Alan Sullivan,
Representations:
13 letter(s) of representation received.   
Recommendation: Refuse 
Reasoned Justification: 
Whilst the proposed residential use of this site would accord with Housing Development Site policy
PROM LOC 3 and is in principle an acceptable use within the General Urban Area, it is considered
that the proposed scale and layout of the development fails to meet the criteria set out in policy EDQ
3 and would result in the loss of a valuable area of open space. The proposed development would
likely have a detrimental impact on traffic and pedestrian safety and on the amenity of neighbouring
dwellings and the wider local area. As such, the proposal is contrary to Local Development Plan
policies EDQ 3 and General Urban Area PP 3 and on balance it is concluded that planning
permission be refused.  
Page 44 of 146

Page 45

Reproduced by permission of
the Ordnance Survey on
behalf of HMSO. © Crown
Copyright and database right
2009.  All rights reserved.
Ordnance Survey Licence
number 100023396.
Planning Application: 23/00385/FUL 
Name (of applicant): Mr Alan Wilson
Site Address: Land South Of
Heatheryford Gardens Plains 
Development: Two semi detached
dwellinghouses 
Page 45 of 146

Page 46

Recommendation: Refuse for the Following Reasons:- 
1. That the proposed development is contrary to policy EDQ 3 in that the proposed development
would have a detrimental impact on the amenity of the area, given the proposed loss of an area of
open space and that the proposed layout of the development is not in keeping with the design of
the wider residential area. 
2. That the proposed development is contrary to policy EDQ 3 as the proposed development would
likely have a detrimental impact on traffic and pedestrian safety due to the location of the
proposed vehicle access and driveway on to a local distributor road. 
3. That the proposed development is contrary to policy General Urban Area PP 3 as it fails to comply
with all aspects of this policy, specifically the provision that any proposal is required to satisfy the
provisions of Policy EDQ 3. As the proposed development is considered contrary to policy EDQ 3,
the proposed development fails to comply with policy General Urban Area PP 3. 
Background Papers: 
Consultation Responses: 
The Coal Authority 
Environmental Health (including Pollution Control) 
Traffic & Transportation 
Contact Information: 
Any person wishing to inspect these documents should contact planningenquiry@northlan.gov.uk. 
Report Date: 
14th September 2023
Page 46 of 146

Page 47

APPLICATION NO. 23/00385/FUL 
REPORT 
1. Site Description 
1.1 The application site is located within an existing established residential estate, with an area of
approximately 585 sqm. The site is located on Heatheryford Gardens, Plains with existing
dwellinghouse to the north, south and west. The application site slopes slightly from the
northwest and north. 
2. Proposed Development 
2.1  Planning permission is sought for a two, semi-detached dwellinghouses. Each semi-detached
dwellinghouse would be two storey with attic accommodation and  will have four bedrooms. A
total of seven off street parking spaces is being proposed to be accessed off Heatheryford
Gardens. 
3. Applicant’s Supporting Information 
3.1  The applicant has provided architectural drawings, site section drawing, daylight/sunlight
assessment drawings, a Mine Entry Report and further site investigation information as part of
this application. 
4. Site History 
4.1 Planning permission for this site (as part of a wider residential development) was initially granted
in 1999 and there have been multiple amendment applications approved since then. The most
recent application (22/00960/FUL) for a single dwellinghouse on this site was refused on 7th
December 2022. 
4.2 Application 22/00960/FUL was refused through  delegated powers and was considered to be
contrary to policies EDQ 3 (Quality of Development) and PP 3 (General Urban Area) due to the
proposal would have a detrimental impact on the amenity of the area, given the proposed loss
of an area of open space and that the proposed layout of the development is not in keeping with
the design of the wider residential area. The proposed development was considered likely to
have had a detrimental impact on traffic and pedestrian safety due to the location of the
proposed vehicle access and driveway being on to a local distributor road. 
5. Development Plan 
5.1  Section 25 of the Town and Country Planning (Scotland) Act 1997 states that a planning
application should be assessed and decided in accordance with the relevant development
plan policies unless material considerations indicate otherwise. 
5.2  National Planning Framework 4 (NPF 4) has now been adopted and was published on 13th
February 2023. NPF4 is now part of the development plan and replaces NPF 3 and Scottish
Planning Policy. NPF 4 sets out policies in relation to creating a sustainable place, a liveable
place, and a productive place. 
5.3  The North Lanarkshire Local Development Plan 2022 (NLLDP) identifies the application site
lying within a Housing Development Site under policy PROM LOC 3 and is further designated
as part of the General Urban Area under policies PP 3 and AD 3. 
5.4  The NLLDP requires that all proposed development be assessed against policies EDQ 1 (Site
appraisal) and EDQ 3 (Quality of Development).  
6. Consultations 
6.1  The Coal Authority has no objections to the proposed development. 
Page 47 of 146

Page 48

6.2  The council’s Pollution Control Service has advised that conditions relating to the undertaking
of site investigation information and any necessary remediation works be attached to any
permission. 
6.3  The council’s Roads Development Service has advised that the applicant proposes to take
direct frontage access from the proposed development site to Heatheryford Gardens via a
dropped kerb vehicular footway crossing. Heatheryford Gardens is a local distributor road from
which direct frontage access to individual dwellings is not permitted. The Roads Development
Service has recommended that this application should be refused on this basis. 
7. Representations 
7.1  We have received 13 objections during the neighbour notification period and advertisement of
this application (including three objections from the same household). Objections from
Councillor Beveridge and Councillor Sullivan were also received.  These 13 objections can be
summarised as
follows:
• Impact on Heatheryford Gardens, the local distributor road, reducing vehicles safe use of
the road
• Impacts on pedestrians’ safe use of the existing footways
• Impacts caused by parking on Heatheryford Gardens
• Possible impacts on emergency vehicles
• Increase traffic on already busy road
• The additional access would cause unnecessary danger to road users and pedestrians
• Loss of expected area of open green space
• Impact on neighbouring sunlight/daylight
• Impact caused by loss of privacy
• Proposed dwellinghouses not in keeping with existing neighbouring dwellings
• The proposed dwellinghouses are overly large.
• The proposed development represents an overdevelopment of the site 
• An application for a single dwellinghouse was recently refused 
7.2  Other issues were raised; however they are not material planning considerations. These include
that there are already issues with speeding on local roads, that there were delays in receiving
neighbour notification letters by post and that the applicant’s drawings do not accurately reflect
the application site and neighbouring properties. 
7.3 All neighbour notification letters are sent via Royal Mail and objector concerns regarding a delay
in receiving neighbour notification letters is noted. 
7.4 Concerns regarding the accuracy of drawings submitted by the applicant as part of this
application is noted. All drawings (and documents) are received in good faith that thye are
correct and accurate. We do, however, undertake our own assessment of the proposed
development including an assessment of all information submitted. 
8. Planning Assessment 
8.1  Section 25 of the Town and Country Planning (Scotland) Act 1997 requires that planning
decisions are made in accordance with the development plan unless material considerations
indicate otherwise. The assessment will therefore identify the development plan policies
relevant to the proposal, will make an assessment against these policies and come to a
conclusion on which decision (grant or refuse) would accord with them. It will then look at
other material considerations to establish if there are any that would suggest a decision
different from the one reached in relation to the development plan. 
National Planning Framework 4 
8.2  The National Planning Framework 4 (NPF 4) is a long-term plan for Scotland that sets out
where development and infrastructure is needed. NPF 4 sets out policies in relation to creating
a sustainable place, a liveable place, and a productive place. 
Page 48 of 146

Page 49

8.3  It is considered that there is no conflict between the policies and aims of NPF 4 and the
policies set out within the North Lanarkshire Local Development Plan 2022. There are no NPF
4 policies that would affect or change the local development plan polices in this case.
Therefore, the proposal will be assessed under the policies of the North Lanarkshire Local
Development Plan 2022. 
North Lanarkshire Local Development Plan 2022 
8.4  The application site is designated as a Housing Development Site under policy PROM LOC 3
within the North Lanarkshire Local Development Plan 2022. This site is further designated as
part of the General Urban Area under policies PP 3 and AD 3 which seek to encouraging
development that is in keeping with area with an often primarily residential character. 
8.5  Policy PP 3 General Urban Area requires such proposals to be to be assessed against the
criteria of EDQ 3 (Quality of Development) which considers issues such as size, materials, and
road safety, and which states that proposals must integrate successfully with the surrounding
area by avoiding harm to the neighbouring amenity. 
8.6  Policy EDQ 1 Site Appraisal requires any development to be appraised in terms of the site and
its surroundings to ensure it will integrate successfully into the local area and avoid harm to
neighbouring amenity. This appraisal addresses matters such as design, massing, topography
and transportation aspects. 
8.7  Policy EDQ 3 Quality of Development sets out that development will only be permitted where
high standards of site planning and sustainable design are achieved. Aspects such as siting;
overall layout; density; form; scale; height; massing; proportion; detailing; colour; materials for
the proposed development need to be considered. Policy EDQ 3 also includes aspects related
to creating areas which provide a sustainable, safe, secure, and convenient access to and from
the development that makes it easy to move around, and is attractive to pedestrians, cyclists,
and people with disabilities. Any development would need to integrate well with public transport,
green networks and wider links. The assessment of and (where necessary) the mitigation of
pollution impacts is also included within policy EDQ 3. 
8.8  With regard to policy PROM LOC 3 Housing Development Sites and policies PP 3 and AD 3
General Urban Area, the proposed development includes two semi-detached dwellinghouses
both being two storey with attic accommodation. Private garden ground, seven off street parking
spaces with access onto Heatheryford Gardens is also proposed. This proposal would be
considered consistent with the site’s designation of being a site for housing development and
would generally be considered acceptable in principle within an area which is often primarily
residential in character. 
8.9  With regard to policy PP 3 and AD 3, the proposed development is located with an existing
General Urban Area and will enable an existing vacant site to be developed. Whilst the
residential use of land within the General Urban area would be deemed to support the purpose
of those places and offer an opportunity to meet the aims of those places, all proposals must
satisfy the provision of policy EDQ 3. So, provided the proposal can be assessed positively
against EDQ 3 (assessment to follow), the development would be regarded as acceptable for
appropriateness under policy PP 3. 
8.10 In relation to policies EDQ 1 the applicant has submitted information in relation to their appraisal
of the application site including architectural drawings, site section drawing, daylight/sunlight
assessment drawings, a Mine Entry Report and further site investigation information as part of
this application. 
8.11 With regard to policy EDQ 3, the impact of the proposed dwellinghouse on this site will need to
be considered. Any proposal would need to comply with policy EDQ 3 in its own right, and also
in terms of the proposal achieving full compliance with the abovementioned policy PP 3. 
8.12 Previous permission for this site detail this site as an area of open space. It is considered that
the removal of this area of open space would be detrimental to the amenity of the wider
residential development given the overall lack of such space being available within the wider
development.
Page 49 of 146

Page 50

8.13 In relation to policy EDQ 3, we consider that the layout of the proposed development is not
acceptable as the proposed space around the dwellinghouse does not comply with council
guidance. The garden ground proposed is insufficient, with little to no front garden ground being
provided. 
8.14 The proposed dwellinghouses would essentially be standalone and not part of the linear street
pattern which as being used within the wider existing residential development. It is considered
that the siting of the proposed development in this location would not be in keeping with the
wider layout of the area. 
8.15 With regard to the transportation aspects of EDQ 3, the proposed development seeks a vehicle
access onto Heatheryford Gardens. The Roads Development Service has recommended that
this application be refused due to the proposed direct frontage access to Heatheryford Gardens
via a dropped kerb vehicular footway crossing. The Roads Development Services has advised
that Heatheryford Gardens is a local distributor road from which direct frontage access to
individual dwellings is not permitted. Furthermore, there are no other properties taking direct
frontage access to this road along its length. 
8.16 As EDQ 3 requires developments to have sustainable access for cars where required, to be
safe for all road users, and for appropriate parking or traffic calming being well located and
integrated, it is considered that the proposed development would likely have a detrimental
impact on traffic and pedestrian safety due to the location of the proposed vehicle access onto
Heatheryford Gardens. It is further considered that given that the proposed vehicle access leads
onto Heatheryford Gardens, local distributor road and its close proximity of the junction of
Gartmorn Grove and Heatheryford Gardens, the proposed vehicle access is not well located
and integrated. 
8.17 Although the proposed development may be consistent with policies PROM LOC 3, PP 3, AD
3, and EDQ 1 of the North Lanarkshire Local Development Plan 2022, given lack of usable
garden ground, the lack of integration with the existing wider residential development and
potential impact of local roads including Heatheryford Gardens, the proposed development
would be contrary to policy EDQ 3 of the North Lanarkshire Local Development Plan 2022. On
this basis a refusal would be in accordance with the development plan and so, in terms of section
25, a refusal should be the decision unless there are material considerations that suggest a
different decision. 
8.18 As for other material considerations, thirteen objections during the neighbour notification period
and advertisement of this application (including three objections from the same household) have
been received. Objections from Councillor Beveridge and Councillor Sullivan were also
received. A summary of all objections is detailed above. 
8.19 The objections received primarily related to impacts on local roads and footways, impact of
daylight/sunlight of neighbouring properties, impact on privacy of neighbouring properties,
impacts on the amenity of the site and the wider existing residential area, the over development
of the site and the loss of a previously approved area of open space. 
8.20 Our assessment with regard to the transportation issues and design concerns raised by
objectors and impacts on planning policy are detailed above. 
8.21 With regards to privacy concerns, it is noted that the proposed dwellinghouses will be higher
than the existing dwellinghouses on Dalcross Way with properties on Brodie Way being at a
higher level than that of the application site. The potential overlooking onto properties on
Dalcross Way would be limited given the lack of windows to the southern (side) elevation of the
semi-detached dwellinghouses. There may be some overlooking due to the level changes
between these properties however it would not be so significant to warrant a refusal in this case.
The distance between the existing windows to the nearest property on Brodie Way is at least
25m, which is significantly higher than the minimally acceptable distance of 18m. 
8.22 In relation to daylight/sunlight concerns which were specifically raised regarding 1 Brodie Way
and 6 Dalcross Way, the applicant has provided daylight/sunlight assessment drawings H18-
02A and H18-22A.
Page 50 of 146

Page 51

8.23 The Building Research Establishment’s guide ‘Site Layout Planning for Daylight and Sunlight’
sets out empirical guidelines and methods for assessing natural light. The 25-degree test is to
establish the effect a proposed building will have on existing properties with regard to
obstructing daylight to existing windows/rooms. If the whole of the proposed development falls
below a 25-degree line drawn from the centre of the lowest rear window of the property facing
each plot, the development is not considered to have a substantial impact on daylight of that
neighbouring property 
8.24 For 6 Dalcross Way which is located to the south/south east of the application site, we consider
the that impact of the daylight/sunlight on this neighbouring property could be impacted by the
proposed dwellinghouses. Drawing H18-22A shows that a significant proportion of the proposed
dwellinghouses is above the 25-degree line shown. 
8.25  For 1 Brodie Way given the distance between the proposed dwellinghouse and the existing
property, it is considered that there would not be a significant impact on the daylight/sunlight of
1 Brodie Way. 
8.26  It is noted that the most recent planning permission (18/01481/FUL) designates the application
site as an area of open space as part of the wider residential development. Whilst no specific
landscaping has yet been planted on this site, once development is completed, would represent
one of a few areas of open space directly accessible by neighbouring residents. We therefore
consider that the loss of this open space would have a negative impact on both the site and the
amenity of the wider area. 
8.27 We consider that whilst not all the concerns raised by objectors can be supported, their concerns
regarding the impact on amenity (daylight/sunlight), loss of open space and transportation
concerns are material considerations which support and add weight to the development plan
conclusions that the proposal be refused. There are no other material considerations that lead
to the proposal being regarded as acceptable despite the development plan position. 
9. Conclusions 
9.1 To conclude, whilst the use of this site for residential accommodation is considered acceptable
in this location, the loss of an area of open space, lack of garden ground, impacts on
neighbouring daylight/sunlight would have an unacceptable and significant impact on the
amenity of the application site and neighbouring existing dwellings. It is considered that given
the limitations of the application site; these impacts cannot be sufficiently mitigated to enable
this application to be approved. 
Page 51 of 146

Page 52

Application No:  
23/00649/S42
Proposed Development: 
Residential Development (in principle) (Section 42 application to
vary condition 2 of planning permission in principle
18/00580/PPP to carry out site investigations and remediation for
each phase of development before development starts within that
phase)   
Site Address: 
Site to the west of
Morningside Road
Newmains 
Date Registered: 
15 August 2023 
Applicant:
Mr W.D & R.T Hill
C/o Holder Planning Ltd
5 South Charlotte Street
Edinburgh
EH2 4AN 
Agent:
Lesley McGrath
Holder Planning
5 South Charlotte Street
Edinburgh
EH2 4AN 
Application Level:
Major Application 
Contrary to Development Plan:
No 
Ward:   
18 Motherwell North
Gerry Brennan,Andrew 
Duffy-Lawson,Ayeshah
Khan, Anne Thomas  
Representations:
0 letter(s) of representations received.   
Recommendation: Approve Subject to Conditions 
Reasoned Justification: 
The application, which proposes variation of Condition 2 of planning permission in principle (Ref
18/00580/PPP approved on 4 February 2020) to allow submission of the site investigation report and
detailed remediation strategy where necessary to be provided in two phases, has been considered
together with a review of all other existing conditions and overall effect of granting a new permission. 
The principle of the development and variation of Condition 2, raise no conflict with the Development
Plan.   
If approved, the existing Legal Agreement under Section 75 Agreement of the Town and Country
Planning (Scotland) Act 1997 as amended, to secure index linked contributions towards local
education provision should be updated to reflect the new permission.  No further contributions under
Section 75 of the Act are sought. 
Page 52 of 146

Page 53

Page 53 of 146

Page 54

Proposed Conditions:- 
1.  Plans and particulars of the matters listed below shall be submitted for consideration by the
planning authority, in accordance with the timescales and other limitations in section 59 of the
Town and Country Planning (Scotland) Act 1997 (as amended). No work shall begin until the
written approval of the authority has been given, and the development shall be carried out in
accordance with that approval. 
(a) the siting, design and external appearance of all buildings and other structures;
(b) the means of access to the site;
(c) the layout of the site, including all roads, footways, car and cycle parking areas;
(d) the details of, and timetable for, the hard and soft landscaping of the site;
(e) details of the management and maintenance of the areas identified in (d) above; 
(f)  the design and location of all boundary walls and fences;
(g) the provision of surface drainage works incorporating SUDS;
(h) the disposal of sewage;
(i)  details of existing trees, shrubs and hedgerows to be retained;
(j)  details of existing and proposed site levels.
(k) details of a play area commensurate with the scale of the proposed development.
(l)  details of necessary noise mitigation measures to be incorporated within buildings, the site
and along its boundaries. 
Reason: to ensure that the matters referred to are given full consideration and to accord with
section 59 of the Town and Country Planning (Scotland) Act 1997 (as amended). 
2.  Before any works of any description start on any phase of development as shown on the
submitted Phasing Plan [Drawing ref: 20170(PL)014], unless otherwise agreed in writing by the
Planning Authority, a comprehensive site investigation report for that phase of development shall
be submitted to and for the approval of the said Authority. The investigation must be carried out
in accordance with current best practice advice, namely, BS 10175: 'The Investigation of
Potentially Contaminated Sites' or CLR 11. The report must include a site-specific risk
assessment of all relevant pollution linkages and a conceptual site model. Depending on the
results of the investigation, a detailed Remediation Strategy may be required. 
Reason: to establish whether site decontamination is required in the interests of the amenity and
wellbeing of future users of the site. 
3.  Any remediation works identified by the site investigation(s) required in terms of Condition 2, shall
be carried out in accordance with a timetable to be agreed in advance with the Planning Authority.
A certificate (signed by a Chartered Environmental Engineer) shall be submitted to the Planning
Authority confirming that any remediation works have been carried out in accordance with the
terms of the Remediation Strategy. 
Reason: to ensure that the site is free of contamination and that any remediation identified has
been implemented in the interests of the amenity and wellbeing of prospective occupiers of the
site. 
4.  Prior to works of any description being commenced on site, unless otherwise agreed in writing by
the Planning Authority, full details of the proposed surface water drainage scheme shall be
submitted to the said Authority. For the avoidance of doubt the drainage scheme must comply
with the principles of Sustainable Urban Drainage Systems (SUDS) in terms of the relevant CIRIA
Manual and other advice published by the Scottish Environment Protection Agency (SEPA). 
Reason: to ensure that the drainage scheme complies with best SUDS practice to protect
adjacent watercourses and groundwater, and in the interests of the amenity and wellbeing of
existing and future users adjacent to and within the development site respectively. 
5.  The SUDS compliant surface water drainage scheme approved in terms of Condition 4 above
shall be implemented contemporaneously with the development in so far as is reasonably
practical. Following the construction of the SUDS, a certificate (signed by a Chartered Civil
Page 54 of 146

Page 55

Engineer) shall be submitted to the Planning Authority confirming that the SUDS have been
constructed in accordance with the relevant CIRIA Manual and the approved plans. 
Reason: to safeguard any adjacent watercourses and groundwater from pollution and in the
interests of the amenity and wellbeing of existing and future users. 
6.  Before any works start on site, the applicant must confirm in writing to the Planning Authority that
foul drainage can be connected to the public sewer in accordance with the requirements of
Scottish Water. The surface water must be treated in accordance with the principles of the
Sustainable Urban Drainage Systems Design Manual for Scotland and Northern Ireland published
by CIRIA in March 2000.  
Reason: to prevent groundwater or surface water contamination in the interests of environmental
and amenity protection. 
7. Before any works start on site, a further survey carried out by an appropriately qualified ecologist,
shall be submitted to and approved in writing by the Planning Authority. This shall identify any
implications for species protected by statute, and where required, include all necessary mitigation
measures. Once approved, any mitigation measures shall be implemented and maintained as
approved under the terms of this condition. 
Reason: to ensure that ecology and habitat surveys are up to date and in compliance with The
Conservation (Natural Habitats & c.) Regulations 1994 (as amended); the Wildlife and
Countryside Act (1981) as amended; the Protection of Badgers Act 1992 (as amended); and the
Nature Conservation (Scotland) Act 2004.) 
8.  Prior to occupation of the first house on the development site, the developer shall submit to the
Planning Authority for its written approval a scheme for the completion, laying out and landscaping
of all on-site open space areas, including details of how these will be maintained in the future.
Once approved, the scheme shall be implemented in accordance with the submitted details. 
Reason: to ensure that the proposed areas of open space are adequately managed). 
9.  Notwithstanding the terms of condition 1 above, submitted plans shall accord with the following: 
• the connection to the existing roundabout at the junction of the A71 with Morningside Road
shall be in accordance with the Design Manual for Roads and Bridges, including those
related to visibility.
• footpath connection to be provided to Fergusson Crescent from the proposed development
site.
• additional bus stops on Morningside Road south of the roundabout at its junction with the
A71, as per the submitted Transportation Assessment.
• the proposed street arrangement should comply with the principles of ‘Designing Streets’.
• House numbers shall not exceed 92 and the site layout shall accord with the approved
development framework drawing (218034_ASL_00_XX_DR_A_0100). 
Reason: in accordance with submitted details and to enable the Planning Authority to consider
these aspects in detail. 
10.  Prior to commencement of development, details of all on-site construction including the location
of the site compound and the means of access to the site for construction traffic shall be submitted
to and approved by the Planning Authority. 
Reason: in the interests of the amenity of the area particularly neighbouring residential properties,
to ensure that necessary contingencies are in place, to minimise pollution risks arising from
construction activities and in the interests of road safety. 
11.  Full details of measures to protect the Auchter Water riverbank during construction, including
details of protective fencing, must be submitted to and approved by the Planning Authority in
writing. Thereafter, during construction phase, the Auchter Water shall be protected at all times
and no materials shall enter it from the application site.  For the avoidance of doubt protection Page 55 of 146

Page 56

measures shall include a construction exclusion zone measured a minimum 10 metre boundary
measured from the top of the bank along the line of the Auchter Water. 
Reason: to ensure the adequate protection of this important watercourse and its habitat. 
12.  No trees within the application site shall be lopped, topped or felled and no hedges shall be
removed from the application site without the written approval of the Planning Authority. 
Reason: in the interests of the conservation value and visual amenity of the site. 
13.  Before any works start on site, a Biodiversity Enhancement Plan, including details for the retention
and management of all woodland, trees, hedges and green space within the site shall be
submitted to the Planning Authority in writing for approval. Thereafter, all woodland and areas of
common green space within the application site as shown on Indicative PPP Masterplan [Drawing
ref: 21804_ASL_00_XX_DR_A_0120], shall be retained in perpetuity for the purpose of providing
biodiversity and informal recreation and for no other purpose. 
Reason: in the interests of conservation, restoration and enhancement of biodiversity and nature
networks. 
14.   That prior to construction works starting on site an intrusive site investigation shall be undertaken
to establish the exact situation regarding the coal mining legacy on site.  The findings of this site
investigation shall be submitted to the Planning Authority in the form of a detailed Coal Mining
Risk Assessment for written approval in consultation with the Coal Authority.  Any remediation
works deemed necessary to implement this development shall be outlined in this report. 
Reason: To ensure that matters relating to coal mining risk are adequately addressed. 
15. That any remediation works identified by the site investigation required in terms of Condition 15,
shall be carried out to the satisfaction of the Planning Authority in consultation with the Coal
Authority. 
Reason:  To ensure that matters relating to coal mining risk are adequately addressed 
Background Papers: 
Consultation Responses: 
Environmental Health (including Pollution Control) received 6th September 2023
The Coal Authority received on 29 August 2023 
Contact Information: 
Any person wishing to inspect these documents should contact Ann McGregor at 01236 632500 
Report Date: 
22nd September 2023 
Page 56 of 146

Page 57

APPLICATION NO. 23/00649/S42 
REPORT 
1. Site Description 
1.1 The application site, which occupies an area of 15.5 hectares (38.3 Acres) is located to the
southeast of Newmains. The site is enclosed to the west by the Auchter Water, to the east by
the residential area off Morningside Road (Grid Reference 556.827) and by open countryside
to the south. The site is accessed from the A71 Morningside Road to the northeast. 
1.2 The site rises north to south before falling at midpoint towards the south and falls
progressively from east to west towards the Auchter water. The north, west and southern site
boundary follow the course of Auchter water. An area of woodland (surrounding a disused
sewage works) lies beyond Auchter water to the north. Land to the west and beyond this water
body is characterised by previous industrial legacy interspersed with natural vegetative
regeneration. Beyond the southern boundary the landscape is characterised by standing
water. 
1.3 The site is characterised by substantial belts and blocks of woodland which lie principally
along the eastern portion of the site (northwest and south of the proposed housing).  To the
west, the land occupying higher slopes has been left undisturbed for a prolonged period and
as a result, a range of tree species have since been established, including Birch and Sallow. 
2. Site History 
2.1 Planning application 06/00733/OUT Land to the west of Morningside Road Morningside
Newmains Business Use Class 4, General Industrial Class 5 and Storage/Distribution Class 6
was withdrawn. 
2.2 Planning application 07/00821/OUT Use of Land for Business Use (Class 4) General Industrial
Use (Class 5) and Distribution / Storage Use (Class 6) was withdrawn. 
2.3 Planning permission 04/01837/FUL (amended by permission 08/00072/AMD) permitted use of
a site to the south of the application site as a rail head and 19/00278/AMD were revoked
following the outcome of appeal decision 18/00580/PPP as the two permissions were
considered incompatible. 
2.4 Planning application 15/01635/PPP (residential development in principle) was refused
permission by the Council in December 2015 due to its impact on the Green Belt and
prematurity in view of the emerging Local Development Plan at the time.  Thereafter,a
subsequent planning appeal was dismissed in April 2017 by the Scottish Ministers.  It was
concluded that whilst there was (at that time) a shortage in the 5-year effective housing land
supply, the proposal would have an unacceptable effect on the function of the Green Belt at
this location.   
2.5 Planning Permission 18/00580/PPP (residential development in principle) sought planning
permission in principle for a proposed a new residential development accessed off the existing
roundabout to northeast of the site on Morningside Road. The application was accompanied
by indicative layout drawings demonstrating that the site has area capacity for 92 houses with
the layout being split into two groupings to the north (44 units) and to the south (48 units);
each linked by a singular road terminating in a cul de sac arrangement on a north south axis.
Drainage infrastructure in the form of a SUD’s pond and pumping station servicing an existing
residential development lies within the boundary of the application site to the south. The
application was refused by the Council in January 2019 on the basis that it would lead to an
inappropriate and unjustified form of development in the Green Belt and would place
additional demands on community facilities and infrastructure without satisfactory mitigation.
The application was subsequently approved on appeal where it was concluded that any
conflict raised with the Development Plan at that time was outweighed by the additional
benefits the development would bring to the economy and to the housing land supply,
particularly so given the site’s allocation  for housing development in the draft LDP at the time. 
Page 57 of 146

Page 58

3. Proposed Development 
3.1 The planning application was submitted under Section 42 of the Town and Country Planning
(Scotland) Act 1997 and seeks to vary Condition 2 (Site Investigations and Remediation
Strategy) of Planning Permission 18/00580/PPP (Residential Development in Principle) &
Associated Uses, to allow submission of the site investigation report and remediation strategy,
where deemed necessary, to be provided in two phases and submitted in accordance with the
detailed planning matters specified by conditions (MSC). 
3.2 Condition 2 of Planning Permission currently reads as follows: 
Condition 2. Before any works of any description start on the application site, unless otherwise
agreed in writing with the Planning Authority, a comprehensive site investigation report shall
be submitted to and for the approval of the said Authority. The investigation must be carried
out in accordance with current best practice advice, such as BS 10175: 'The Investigation of
Potentially Contaminated Sites' or CLR 11. The report must include a site-specific risk
assessment of all relevant pollution linkages and a conceptual site model. Depending on the
results of the investigation, a detailed Remediation Strategy may be required. 
Reason: to establish whether or not site decontamination is required in the interests of the
amenity and wellbeing of future users of the site. 
3.3 The proposed variation to the wording of Condition 2 (highlighted in bold below) would read as
follows: 
Condition 2. Before any works of any description start on any phase of development as
shown on the submitted Phasing Plan Drawing Number 20170 (PL) 014, unless otherwise
agreed in writing with the Planning Authority, a comprehensive site investigation report for that
phase of development shall be submitted to and for the approval of the said Authority. The
investigation must be carried out in accordance with current best practice advice, such as BS
10175: 'The Investigation of Potentially Contaminated Sites' or CLR 11. The report must
include a site-specific risk assessment of all relevant pollution linkages and a conceptual site
model. Depending on the results of the investigation, a detailed Remediation Strategy may be
required.   
Reason: to establish whether or not site decontamination is required in the interests of the
amenity and wellbeing of future users of the site 
4. Applicant’s Supporting Information 
4.1 The applicant has provided a letter in support of the variation of Condition 2 of the existing
permission, together with suggested amendments to the wording of the condition and a
proposed phasing plan.   
4.2 The site was formerly used for mining operations and occupied in part by rail lines. Mine
workings have now been completed and the site has been restored. A phase 1 Site
Investigation Report accompanied the application for Planning Permission in Principle
(18/00580/PPP) and identified the need for further site investigation works consisting of: 
• Trial pits  
• Cable percussive boreholes 
• Chemical contamination analysis 
• Gas and water monitoring 
• Rotary drilling Invasive plant survey 
4.3 The works will inform, where appropriate, any Remediation Strategy to enable the site to be
developed. 
4.4 The applicant has advised that given the size of the site (15.5 hectares), it would be expedient
to carry out the site investigations in a phased manner. The findings of site investigations in
Page 58 of 146

Page 59

Phase one will inform the specification for site investigations in Phase two. 
5. Development Plan 
5.1 The statutory development plan consists of National Planning Framework 4 (NPF4) and the
North Lanarkshire Local Development Plan, Adopted 6th July 2022 (LDP). 
5.2 The site is allocated in the LDP for housing (Housing Allocation NLMW1173) and is located in
the General Urban Area where the following principal LDP policies and NPF4 policies apply:   
• LDP Policy PROM LOC3 Housing Development Sites 
• LDP Policy PP3 Purpose of Place
• NPF4 Policy 15 Local Living and 20 Minute Neighbourhoods 
• NPF4 Policy 16 Quality Homes 
5.3 Also relevant are LDP and NPF4 policies:
: 
• LDP Policy CI Contributions to Infrastructure 
• LDP Policy EDQ 1 Site Appraisal
• LDP Policy EDQ 2 Specific Features for Consideration
• LDP Policy EDQ 3 Quality of Development
• LDP Policy PROM LOC4 Special Landscape Areas & Green Network Improvements
• LDP Policy PROT A Natural Environment and Green Network Assets 
• LDP Policy PROM ID1 Transport Improvements
• LDP Policy PROM ID2 Utilities Improvements 
• NPF4 Policy 1 Tackling the climate and  nature crises
• NPF4 Policy 2 Climate mitigation and adaptation
• NPF4 Policy 3 Biodiversity 
• NPF4 Policy 4 Natural Places
• NPF4 Policy 6 Forestry, Woodland and Trees 
• NPF4 Policy 9 Brownfield, Vacant and Derelict Land and Empty Buildings 
• NPF4 Policy 13 Sustainable Transport 
• NPF4 Policy 14 Design, Quality and Place 
• NPF4 Policy 20 Blue and Green Infrastructure 
• NPF4 Policy 23 Health and Safety 
5.4 Material to the current application is the existing planning permission in principle
(18/00580/PPP) which was granted on appeal by Scottish Ministers on 12 July 2021 and the
site’s allocation for housing in the current LDP.   
6. Consultations 
6.1 NLC Environmental Health (including Pollution Control) has no objection to the proposed
variation of the Condition 2 (Site Investigation and Remediation Strategy) of the existing
permission to allow the site investigations to be carried out in a phased manner. 
6.2 NLC Roads has responded to advise that the original Transport Assessment comments
provided in respect to the existing planning permission in principle (Ref: 18/00580/PPP) are
still very relevant and should be addressed by the applicant before proceeding.  NLC Roads
original comments in response to the Transport Assessment submitted at the time are
reiterated below:   
• The proposed development does not appear to be well served by public transport.
Therefore, further details will be required regarding the following:
• Pedestrian accessibility to the proposed development including active travel routes
and routes to school. 
• Bus stops noted on Bonkle Road and Manse Road appear to be located outwith the
recommended maximum distance of 400m from housing. Suitable locations where
Page 59 of 146

Page 60

additional bus stops, preferably in lay-bys, could be located on Morningside Road
south of its junction with the A71, to improve potential for bus usage.
• Other railway stations exist which could potentially be used by residents of the
proposed development site, e.g. Cleland and Hartwood - they should be indicated.
• It should be noted the SCOTS National Roads Development Guide has not been
adopted by North Lanarkshire Council. 
7. Representations 
7.1 Following the standard neighbour notification and press advertisement, no representations
have been received. 
8. Planning Assessment 
8.1 The application has been submitted under Section 42 of The Town and Country Planning
(Scotland) Act 1997 as amended which applies to applications for planning permission for
development of land without complying with conditions subject to which a previous planning
permission was granted. Section 42 provides that the Planning Authority shall: 
• Consider only the question of the conditions subject to which planning permission
should be granted [S42 (2)] 
• Decide that if planning permission should be granted subject to conditions differing
from those subject to which the previous permission was granted, or that it should be
granted unconditionally, grant planning permission accordingly [S42 (2) (a)] 
• Decide that if planning permission should be granted subject to the same conditions
as those subject to which the previous permission was granted, refuse planning
permission accordingly [S42 (2) (b)]. 
8.2 Section 25 of the Town and Country Planning (Scotland) Act 1997 as amended provides that
where, in making a determination under the Planning Acts, regard is to be had to the
Development Plan, that  determination shall accord with the Development Plan unless material
considerations indicate  otherwise. This principle applies to decisions taken on Section 42
applications (Jermon v West Dunbartonshire Council [2008] CSOH 76 and Pye v Secretary of
State for the Environment [1999] PLCR  28] and is expanded upon in Paragraph 5 of Planning
Circular 3/2013 where it is noted that in certain  cases, applications submitted under Section
42 of the Act does not preclude the consideration of the  overall effect of granting a new
planning permission [clarified in Pye and followed in City of Edinburgh Council against The
Scottish Ministers and (First) Granton Developments Ltd and (Second) Lester Gibbons [2020]
ScotCS CSIH 13].   
8.3 The Development Plan consists of The North Lanarkshire Local Development Plan (LDP)
Adopted 6th July 2022 and the National Planning Framework 4 (NPF4), adopted on 13th
February 2023. The determination of the application must therefore be made in accordance with
both.  However, in the event of any incompatibility between NPF4 and the LDP, NPF4 is to
prevail in accordance with Section 24 (3) of the Act.  Statements contained in both the LDP and
NPF4 are also material to the determination of the application. Whilst the LDP and NPF4 must
be read and applied as a whole and all applications subjected to assessment under both, the
relative power of individual policies must still be weighed up in the balance of planning
judgement. 
8.4 The existing permission in principle was approved by Scottish Ministers in July 2019 prior to
the adoption of the current LDP and adoption of NPF4 by Scottish Ministers. In view of
changes to LDP and NPF4 policy since approval of the existing permission, it is necessary to
consider whether the proposal meets the objectives of the current LDP and NPF4, together
with consideration of the proposal to vary of Condition 2 of the existing consent. It is also
appropriate to ensure that all other conditions attached to the grant of any new planning
permission in principle do not raise any conflicts with NPF4 or the LDP. Accordingly, the
planning assessment considers the current proposal to vary Condition 2 of the existing
Page 60 of 146

Page 61

permission in the context of the LDP and NPF4 and the overall effect of granting a new
planning permission in principle, together with a review of conditions attached to the existing
planning permission in principle and any other material considerations. 
Variation of Condition 2 of Planning Permission in Principle (18/00580/PPP) 
8.5 Policy EDQ2 of the LDP and Policy 9 of NPF4 provide that where land is known or suspected
to be unstable or contaminated, development proposals will demonstrate that the land is, or
can be made, safe and suitable for the proposed new use. The existing planning permission in
principle makes provision in Condition 2 (Site Investigations and Remediation Strategy) for
site investigations to be carried out and, where necessary remediation of the site, prior to
commencement of the development.  Given the size of the site (15.5 ha), the proposed
variation of Condition 2 seeks to revise the wording of the condition to allow for the submission
of the site investigation report and remediation strategy to be provided in two phases.  The
applicant has advised that the findings of site investigations in the first phase will inform the
specification for site investigations in the second phase. The site investigation report and
remediation strategy would then be submitted in accordance with the revised condition in a
detailed planning application for matters specified in conditions (MSC).  The phasing of the
site investigations and remediation does not raise any conflicts with Policy EDQ2 of the LDP
and/or Policy 9 of NPF4.   Subject to other material considerations, outlined below, it is
recommended that Condition 2 of the existing consent is therefore varied to allow site
investigations to be conducted in a phased approach. 
Effect of Granting New Planning Permission in Principle 
8.6 The effect of granting the current application to vary Condition 2 of the existing permission will
result in a new stand-alone planning permission in principle, entirely independent of the
original permission, that will be subject to a statutory commencement date of either five years
from the date of the Decision Notice as provided for in Section 59 (2A) (a) of the Town and
Country Planning (Scotland) Act 1997 as amended, or any such other period as the Planning
Authority may specify under Section 59 (2A) (b) of the Act.  This raises the question as to
whether the council would approve the same development for housing on the application site
in light of the new national and LDP policy position.  The effect of refusing the current
application, will not alter the validity of the existing permission.   
The Principle of Housing Development on the Site 
8.7 The principle of housing development on the site was established by Scottish Ministers
(Planning Appeal Reference: PPA-320-2135 and Planning Application Reference
18/00580/PPP) on 12 July 2019 based on a shortage of land for housing in the housing land
supply and given that the site had already been identified for housing in the emerging LDP at
that time.  Following the appeal decision, the site was allocated for housing development in
the current LDP (Adopted July 2022) where Policy PP3 Purpose of Place and AD3 Amount of
Development of the LDP apply; both of which generally support housing development that is in
keeping with the residential character of the General Urban Area and where it improves
residential amenity.  Following adoption of the LDP, NPF4 came into force (13 February 2023)
and became part of the statutory development plan. Policy 16 Quality Homes of NPF4
supports existing LDP land allocations, including land allocated for housing development. 
There is no incompatibility between Policy 16 of NPF4 and Policies PP3 and AD3 of the LDP;
both support housing development on sites allocated for housing in the LDP. In view of the
new policy context, there is no reason to doubt the principle of housing development on the
site as still being acceptable. The principle of housing on the site raises no conflict with the
LDP or NPF4.   
8.8 If the current application is approved, matters currently secured by condition and/or by legal
agreement, including design and layout, drainage and flood risk, noise, landscape, ecology,
transport, coal mining risk and community facilities and infrastructure, would be subject to
approval by the  Planning Authority and further details would be submitted separately in any
forthcoming MSC application(s).  Notwithstanding, the above, the following matters have been
reviewed to ensure compliance with the current LDP and NPF4: 
Page 61 of 146

Page 62

Design and Layout 
8.9 Policy EDQ 1 Site Appraisal requires development to be appraised in terms of its site and
surroundings to ensure that it will integrate successfully into the local area and avoid harm to
neighbouring amenity. It addresses matters such as design, massing, topography and
transportation aspects. Policy EDQ 3 Quality of Development provides that development will
only be permitted where high standards of site planning and sustainable design are achieved
and assesses aspects such as siting; layout; density; form; scale; height; massing; proportion;
materials and parking. Where necessary, the assessment of mining, pollution and satisfactory
mitigation are also required under Policy EDQ3. Policies EDQ1 and EDQ3 are considered to
be compatible with the broad aims and  objectives of Policy 14 Design, Quality and Place of
NPF4 which seeks to improve the quality of an area, irrespective of its location in an urban or
rural setting, against fixed criteria that is considered to be consistent with the criteria detailed
in EDQ1 and EDQ3. 
8.10 The design and layout shown on ‘Indicative, Illustrative Masterplan’ dated April 2018 (Drawing
Number 218034_ASL_00_XX_DR_A_0110) proposes housing split into two groupings; 44
units to the north and 48 units to the south of the site linked by a singular road and terminating
in a cul de sac arrangement on a north south axis, together with integration of new and
existing pedestrian routes, increased permeability to existing landscaping features, increased
banding zone of riparian vegetation and reduced area for development. A focal point of the
layout as indicated in the Design and Access Statement by Austin Smith Lord and shown on
the Illustrative Masterplan is the retention of a substantial area of woodland in the centre of the
site.  Drainage infrastructure in the form of a SUD’s pond and pumping station servicing the
existing residential development to the east lies within the site boundary of the application site.   
The design and layout, whilst illustrative, does not raise any conflict with Policies EDQ1 and
EDQ3 of the LDP or Policy 14 of NPF4 and is currently subject to a condition (Condition 1 of
the existing consent) requiring further detailed information to be submitted for approval by the
Planning Authority. Condition 1 of the existing consent sufficiently addresses design and
layout matters. It is therefore recommended that the condition is carried over should planning
permission in principle be granted. 
Drainage and Flood Risk 
8.11 Policy EDQ1 provides that development will require to be appraised in the context of its site
and surroundings to ensure that it will integrate successfully into the local area and take
account of any impacts associated with the holistic water environment, flood risk, public
utilities and drainage systems. The policy is compatible with Policy 22 Flood Risk and Water
Management of NPF4. A Flood Risk and Drainage Assessment was submitted in support of
the existing consent together with detailed plans of the proposed drainage layout showing
disposal of foul sewage and surface water drainage. Whilst SEPA no longer provides advice
on applications for developments located outside the functional flood plain, it did not raise any
objection to the development when consulted previously in respect of the existing planning
permission in principle.  Drainage and flood risk are matters that require to be addressed
further in any forthcoming MSC application and it is considered that Conditions 1 (g), 1 (h), 4,
5 and 6 of the existing planning permission in principle adequately address these matters.  It is
therefore recommended that Conditions 1 (g), 1 (h), 4, 5 and 6 of the existing planning
permission in principle are carried over should planning permission in principle be granted. 
Noise 
8.12 The noise impact of development proposals on residential amenity and health, are addressed
in Policy EDQ3 of the LDP and Policy 23 of NPF4. Both policies are aligned in that they seek
to ensure that mitigation is provided where necessary to rule out any unacceptable noise
impacts.   A Noise Impact Assessment was submitted in support of the previous consented
application and no objection was raised by NLC Protective Services. A condition was also
attached [Condition 1 (l)] to ensure that details of noise mitigation measures are incorporated
within buildings, the site and along its boundaries and that details are submitted to the
Planning Authority for approval in any forthcoming MSC application. In view of recent and
previous comments received from Protective Services and given measures to mitigate any
concerns relating to noise, it is considered that the proposed development raises no conflict
with Policy EDQ3 of the LDP or Policy 23 of NPF4.  Should planning permission in principle be
Page 62 of 146

Page 63

granted, it is recommended that Condition 1 (l) of the existing consent is carried over. 
Landscape, Woodland and Trees 
8.13 Policy EDQ1 of the LDP requires proposals for development to integrate successfully into the
local landscape character and to be accompanied by an appraisal that takes account of
Designing Streets and other relevant guidance. There is no conflict between Policy EDQ1 and
other policies contained in NPF4.  Whilst Policy 4 Natural Places of NPF4 is broader in context
and provides that unacceptable impacts on the natural environment will not be supported,
Policy 6 Forestry, Woodland and Trees of NPF4 is more specific in context and addresses
impacts on existing woodland and tree cover.  In each instance, it is clear that proposals that
will have an adverse impact on either the natural environment or on existing woodland and
tree cover will not be supported. 
8.14  The previous application for planning permission in principle was accompanied by a
Preliminary Landscape Appraisal.  The Appraisal notes that in the northern half of the site,
there are two level platforms which present ready development opportunities.  Similarly, rank
grassland to the southeast, immediately adjacent to residential development at Morningside,
also presents some development potential. It is also noted in the Appraisal that elsewhere,
steep embankments and rising ground to the east are now well wooded with broadleaf trees
planted approximately 20 years ago. To the west, the neglected land has been colonised by
various tree species including Birch and Willow. Riparian vegetation along the Auchter Water
is thin and in generally poor condition. The Design and Access Statement submitted in support
of the approved planning permission in principle proposed retention and extension of the
existing woodland resource to include an additional belt of riparian vegetation 10.0M wide
along the banks of the Auchter Water on the basis that it would contribute towards the wider
green network, linking core habitats to the north and south. 
8.15 The Design and Access Statement outlines proposals to incorporate each of the above
opportunities within the design and layout of the development, together with retention and
extension of the existing woodland to ensure that the proposed development integrates well
with the existing landscape. This was supported and encouraged previously by NLC Green
Spaces and in view of the benefits to biodiversity net gain and visual amenity, the proposed
landscaping and woodland/tree planting and retention is considered to comply fully with the
objectives of Policy EDQ1 of the LDP and Policies 4 and 6 of NPF4.   
8.16 Condition 8 of the existing consent requires further details of landscaping to be submitted and
approved by the Planning Authority in any forthcoming MSC application, whilst Condition 9
seeks to ensure that the development is implemented in accordance with the approved
development framework (Illustrative Masterplan). It is recommended that, if planning
permission in principle is granted, Conditions 8 and 9 of the existing planning permission in
principle are carried over.  Condition 12 of the existing consent which seeks to protect the
woodland area and all existing trees and hedges on site in the interests of the conservation
value and visual amenity of the site should equally be carried over to the grant of any new
planning permission in principle.   
8.17 Further, there is now a requirement, provided for in Policy 3 Biodiversity of NPF4, to ensure
that proposals for major development contribute to the enhancement of biodiversity, including
where  relevant, restoring degraded habitats and building and strengthening nature networks
and the connections between them, including future management. Similarly, there is a
requirement in Policy 20 Blue and Green Infrastructure of NPF4 to ensure that blue and green
infrastructure forms an integral element of design that responds to local circumstances with no
net loss of either and, a requirement in Policy PROM LOC4 of the LDP to improve community
access, recreation opportunities, and environmental and ecological quality in natural areas
and green spaces that contribute to the health and quality of life through provision of green
networks, corridors and linkages which are widely regarded as a key mechanism for reversing
the effects of fragmentation on  biodiversity. The proposed development presents an
opportunity to enhance biodiversity and the existing green infrastructure and to provide and
improve active travel links, public amenity and recreational opportunities. Given that
biodiversity enhancement /incorporation of green and blue infrastructure has not been
addressed in the current application and/or in any of the conditions attached to the existing
planning permission in principle, it is recommended that if the current application for planning
Page 63 of 146

Page 64

permission in principle is approved, a new condition (Condition 13 Biodiversity Enhancement)
is imposed to ensure that it is incorporated in the detailed design as required by Policy PROM
LOC4 of the LDP and Policy 3 of NPF4. 
Ecology 
8.18    Policy PROT A Natural Environment and Green Network Assets provides that development will
only be  permitted where an appraisal has demonstrated that protected species would not be
compromised or that any significant adverse effects on the protected species are mitigated.
The policy applies to all  areas and notes under Category 5 that not all locations important for
species are identified within it. Equally, Policies 3 Biodiversity and 20 Blue and Green
Infrastructure of NPF4 seek to protect natural habitats and enhance biodiversity. Whilst the site
is not covered by any statutory designations, it lies to the south of Braedale Hill Local Nature
Reserve (LNR) and is separated from the LNR by the A71 road and is adjacent to the Auchter
Water.  The site is also occupied by substantial blocks of woodland and riparian vegetation along
the Auchter Water which it is proposed will be extended.  The location and characteristics of the
site present an opportunity to enhance biodiversity.   
8.19 The previous application was supported by an Ecology Habitat Survey and supplementary
information on protected species and habitat. The development was not considered to require
an Environmental impact assessment (EIA) to record all species present.  NLC Greenspace at
that time recommended a number of habitat improvement measures.  These were
subsequently covered by planning conditions, including Conditions 4, 7, 8, 11 and 12. It is
recommended that if planning permission in principle is granted, Conditions 4, 7, 8, 11 and 12
should be carried over to the new permission, together with the addition of Condition 13
(Biodiversity) to address biodiversity enhancement (including the impacts of artificial lighting
on habitats and their species) in accordance with updated policies contained in the LDP and in
NPF4.   
Coal Mining Legacy 
8.20 Policy EDQ2 Specific Features for Consideration of the LDP and Policy 9 Brownfield, Vacant
and Derelict Land and Empty Buildings of NPF4 require that where land is known or
suspected to be unstable or contaminated, development proposals will demonstrate that the
land is, or can be made, safe and suitable for the proposed new use. 
8.21 The site lies within a Coal Authority high risk area. A Coal Mining Risk Assessment was
therefore submitted in support of the existing planning permission in principle. The Coal
Authority concurred with the conclusions of the Mining Risk Assessment Report and the
subsequent report on preliminary site investigations, advising that coal mining legacy poses a
risk to the proposed development and that further intrusive site investigation works should be
undertaken prior to development in order to establish the exact situation regarding coal mining
legacy issues on the site. Accordingly, if planning permission in principle is granted, it is
recommended that Conditions 14 (Intrusive Site Investigations) and 15 (Remediation) are
imposed. 
Community facilities and Infrastructure 
8.22 Policy CI Contributions to Infrastructure seeks to secure developer contributions for new
developments that, individually or cumulatively, generate a requirement for new or enhanced
infrastructure.  The existing permission is subject to a Legal Agreement under Section 75 of
the Act to mitigate against impacts upon local education provision as a result of the
development.  Should planning permission in principle be granted, the existing Section 75
Agreement will require to be updated to take account of the new permission.   
Transportation 
8.23 A Transportation Assessment was previously submitted in support of the existing planning
permission in principle, which NLC Roads has reviewed and commented on.   It is noted that
since the time of the original submission and appeal decision to grant planning permission for
housing, the site has been allocated for housing in the adopted LDP.  This followed a lengthy
and thorough LDP examination process during which the reporter concluded and attached
Page 64 of 146

Page 65

weight to the finding, that housing on the site would represent sustainable development.  In
accordance with the reporter’s recommendations, it is now for the Development Management
process at MSC stage to ascertain whether concerns raised by NLC Roads can be alleviated,
mitigated, or avoided in accordance with the requirements of Policy 13 Sustainable Transport
and Policy 15 Local Living and 20 Minute Neighbourhoods of NPF4.  Should planning
permission in principle be granted, matters raised by NLC Roads will require to be addressed
in accordance with Condition 9 and Policy 16 of NPF4. 
Other Material Considerations 
8.24 The existing planning permission in principle (Ref 18/00580/PPP) which was granted on
appeal on 12 July 2019 and the site’s allocation in the LDP adopted on 6 July 2022 are
material considerations that carry significant weight in the determination of this application. 
Conclusion 
8.25 The current application, which has been submitted under Section 42, seeks to vary the
wording of Condition 2 of planning permission in principle (Ref 18/00580/PPP) to allow
submission of the site investigation report and remediation strategy, where deemed
necessary, to be provided in two phases as part of the subsequent detailed planning
application for matters specified by condition.  The effect of the current application, if
approved, would be to grant a new stand-alone planning permission in principle, which is
entirely independent of the original permission. The permission will be subject to a statutory
commencement date of either five years from the date of the Decision Notice as provided for
in Section 59 (2A) (a) of the Town and Country Planning (Scotland) Act 1997 as amended, or
any such other period as the Planning Authority may specify under Section 59 (2A) (b) of the
Act.  In view of the overall effect of granting a new planning permission in principle coupled
with changes to the national and local policy position, it was appropriate to reassess the
proposed development in its entirety alongside the proposal to vary Condition 2 of the existing
consent.   Subject to conditions, including supplementary conditions, 13, 14 and 15, it is
recommended that Condition 2 of the permission is varied to allow phasing of the site
investigations and remediation strategy and that a new stand-alone planning permission in
principle is granted.   
8.26 If the recommendation is accepted, the issuing of the planning permission in principle will be
subject  to a legal agreement to secure index linked contributions towards the local education
provision that was agreed before the grant of the previous planning permission18/00580/PPP. 
Page 65 of 146

Page 66

Page 66 of 146

Page 67

North Lanarkshire Council
Report
PLANNING COMMITTEE  
Agenda item _________   approval x noting Ref LB/ES Date 12/10/2023  
NOTICE OF PLANNING AND ENFORCEMENT APPEALS
DECISIONS 
From Chief Officer (Place)
Email humphriesp@northlan.gov.uk Telephone 01236 632500 
Executive Summary
1. Purpose of Report 
1.1        This report is to advise the Committee of the recent decisions in respect of the 
undernoted planning appeals. 
Recommendations
It is recommended that the Committee note the decision in respect of this appeal. 
Background
Application No. &
Proposal 
Applicant & Site Appeal
Decision &
Date 
Note
21/01460/MSC
Erection of 75
Homes with
Associated Works
(Phase 3)
Bellway Homes &
Deuchny Properties
Land East Of
Lochend Road
Gartcosh 
Appeal
Dismissed
12/09/2023 
PAMELA HUMPHRIES 
Chief Officer (Place) 
(02/10/2023)   
Item 3
Page 67 of 146

Page 68

Page 68 of 146

Page 69

North Lanarkshire Council
Report
Planning Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref     Date 12/10/23 
Draft Supplementary Guidance: Education Contributions 
From  Pamela Humphries, Chief Officer (Place)  
E-mail laingg@northlan.gov.uk Telephone Gordon Laing,
07970018874 
Executive Summary
The purpose of this report is to seek Planning Committee approval to undertake the public
consultation with external stakeholders on the Draft Supplementary Guidance on
Education Contributions. This will provide guidance for developers and landowners on the
circumstances in which residential development proposals are required to be assessed in
terms of their impact on the capacity of the education estate and the ability to accommodate
the pupils generated by the development in the local schools. 
The guidance outlines the process on how the Council will continue to seek contributions
towards education infrastructure in Primary and Secondary catchment areas where
required. 
Contributions will be requested where capacity issues are identified through the cumulative
impact of all emerging housing developments identified through the Housing Land Audit
and Local Development Plan. 
The developer contributions will be required to contribute towards providing additional
capacity through the provision of a new build school, permanent additional classrooms
(extensions or modular accommodation) and adaptations to existing schools. 
Following consultation, the document will be finalised and submitted for further Committee
approval prior to submission to the Scottish Government.  On Scottish Government
approval the guidance document will be published and become part of the North
Lanarkshire Local Development Plan. 
Recommendations
It is recommended that the Committee: 
1) agrees the draft policy guidance appended to this report and the proposed public
consultation with external stakeholders. 
Item 4
Page 69 of 146

Page 70

1. Background 
1.1 The North Lanarkshire Local Development Plan (NLLDP) was Adopted in July 2022.
As recommended by the Examination Reporter, this Supplementary Guidance (SG)
relates to Policy CI 1 Category Education Contributions set out on page 71 of the
NLLDP Policy Document. 
1.2 The main purpose of this guidance is to provide guidance for developers and
landowners on the circumstances in which residential development proposals are
required to be assessed in terms of their impact on the capacity of the education estate
and the ability to accommodate the pupils generated by the development in the local
schools. 
1.3 For all qualifying residential developments of 5 or more units the council will seek to
secure contributions towards education infrastructure in Primary and Secondary
catchment areas where required. These will be requested where capacity issues are
identified through the cumulative impact of all emerging housing developments
identified through the Housing Land Audit and Local Development Plan. 
1.4 The developer contributions will be required to contribute towards providing additional
capacity through the provision of a new build school, permanent additional classrooms
(extensions or modular accommodation) and adaptations to existing schools. 
1.5 The SG is intended to secure best value for the Council and ensure that the required
education facilities and infrastructure are provided where necessary. The guidance
promotes good practice on pupil yield evidence and engagement with developers to
deliver any necessary expansion or new build schools as a direct result of the impact
on the school estate from new housing developments. 
2. Report 
2.1 This Supplementary Guidance (SG) aims to assist landowners and developers in
carrying out their initial financial appraisals to ensure that they take full account of
development viability and will assist in determining the circumstances and the cost of
education contribution requirements for their site at an early stage. 
2.2 The document outlines the legislative and planning framework with regards to
education contributions guidance and outlines that new development can have a
significant impact on a wide variety of existing infrastructure, facilities, services and
amenities and in such circumstances where it can be justified the Council will seek
developer contributions to offset such impacts. 
2.3 Residential housing developments can place additional requirements and capacity
constraints on the education services of the Council. This guidance outlines the
circumstances in which residential development proposals are required to be assessed
The Plan for North Lanarkshire
Priority  Support all children and young people to realise their full potential
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work Brighter Futures
Page 70 of 146

Page 71

in terms of their impact on the capacity of the education estate and the ability to
accommodate the pupils generated by the development in the local schools. All
qualifying residential developments of 5 or more units will be assessed with regards to
their impact on the education estate. 
2.4 The council will continue to seek to secure contributions towards education
infrastructure in Primary and Secondary catchment areas where required. These will
be requested where capacity issues are identified through the cumulative impact of all
emerging housing developments identified through the Housing Land Audit and Local
Development Plan. 
2.5 The developer contributions will be required to contribute towards providing additional
capacity through the provision of a new build school, permanent additional classrooms
(extensions or modular accommodation) and adaptations to existing schools. 
Implementation 
2.6 When a planning application relating to development is submitted to the Council for
consideration, it will be assessed to determine if there is a requirement for the
prospective developer to make an appropriate developer contribution in accordance
with the provisions of this supplementary guidance. 
2.7 Development contributions will be sought for a contribution towards education
infrastructure for all dwellings, except for developments that are within one of the
following categories which are exempt from education developer contributions: 
• One bedroom Dwellings;
• Proposals of fewer than 5 Dwellings;
• Change of use, conversion or redevelopment whereby no additional residential units
are constructed;
• Development that would not put capacity pressures on schools e.g. Student
accommodation linked to college/universities, housing for the elderly or dwellings
with occupancy restrictions that prohibit children of nursery or school age.
• Non-residential development. 
2.8 Phased contributions will be acceptable in most instances and indicative conditions
attached to any agreement to include the education authority retaining any payment for
a specified period or as otherwise agreed with the Council, following the completion of
the final dwelling, after which time the payment would be returned to the applicant if not
spent or committed in full by the Council within 28 days of receipt of a written request
from the applicant. 
2.9 Contributions will be index linked to inflation from the point of the Council being minded
to grant planning permission with the indexation being the All-in Tender Price Index as
published by the Building Cost Information Service of the Royal Institution of Chartered
Surveyors on a quarterly basis. 
2.10 In the committee report of January 2020, entitled Education Contributions –
Gartcosh/Glenboig and South Cumbernauld Community Growth Areas, a new baseline
figure for the CGAs was set but it was advised that "Going forward this matter will be
kept under review to make sure that the contribution level remains current.” The SG,
as required by the Policy in the LDP, applies to all residential developments therefore
the SG is considered to represent the review referred to in 2020 and will apply to all
applications and sites in the CGAs not currently subject to a legal agreement.
Page 71 of 146

Page 72

Development Viability 
2.11 The council is keen to support the development of brownfield sites which are
designated for residential development.  It is however recognised that some sites are
particularly challenging to develop due to high remediation and/or infrastructure costs. 
In some cases the addition of an Education contribution may render a site economically
unviable. It is proposed that in certain, limited, circumstances the council will consider  
a reduction or give an exemption from the requirement for an education contribution. 
In these circumstances it is proposed that this would be conditional on development
commencing within a reasonable timescale and would be subject to review after 3 – 5
years (depending on site capacity) if development has not started or has stalled. 
2.12 In circumstances where a developer considers that development viability is
compromised by the requirement for an education contribution there is a requirement
for all developers to undertake a full viability appraisal at the outset of their development
which considers all likely costs including any other developer obligations and affordable
housing if applicable. 
2.13 Standard Development costs such as demolition works, retaining and ground works,
landscaping, archaeological investigations, drainage works, site purchase, site
servicing and flood prevention works will not normally be accepted as abnormal costs.
Abnormal costs should be reflected in the purchase price of the land and in this respect,
the developer will be asked to demonstrate that the purchase price reflects the
condition of the site, including abnormal costs, as far as these could be reasonably be
known.   
2.14 Appendix 3 of the supplementary guidance attached to this report sets out the
procedure that the developer would be required to carry out for unforeseen costs to be
considered by the Council. 
Contribution Trigger 
2.15 The cumulative impact assessment of emerging housing identifies those schools where
it is anticipated that the pupils generated by housing allocations (programmed up by
the current Housing Land Audit and Local Development Plan), will increase school
capacity beyond 90%. Developer contributions for Education will be sought for
infrastructure within these school catchment areas towards the projected pupils
generated above 90% of the school capacity. The cost of accommodating these pupils
is shared across the residential units (programmed in line with the current Housing
Land Audit and Local Development Plan) within the catchment area. 
Calculations 
2.16 The contribution is calculated using the Pupil Product Ratio against the number of
houses planned within the catchment area of each school. The number of pupils
generated is added to the current number of children in each school to calculate the
overall percentage capacity. The number of spaces is proportionated against each
school based on the Denominational/Non-Denominational split. This is calculated
annually and based on a rolling five-year average. If the occupancy is identified to
exceed 90% then a developer contribution will be required. If it is below 90% then a
contribution is unlikely. If a school already exceeds 90% then a contribution will be
required. 
Page 72 of 146

Page 73

Pupil Product Ratio (PPR) 
2.17 The PPR is the number which identifies the average number of pupils relative to new
areas of housing. Contributions are based on the anticipated number of residential units
to generate children of school age (the anticipated number is represented as a pupil
product ratio per property). The PPR used in North Lanarkshire for each age range is
as follows: 
Primary School: 0.3 
Secondary School: 0.24 
It should be noted that these numbers are used as examples for the calculations
based on the current figures. The figures above will be updated with the most up
to date figures as and when the supporting information becomes available on an
annual basis. 
2.18 In order to achieve the correct calculation for each school the number of units within a
development is multiplied by the Pupil Product ratio to project the total number of pupils
anticipated to present for both primary and secondary education. The total is then split
by the five-year average Non-Denominational/Denominational ratio. The five year
average ratio is calculated by looking at the pupils in geographical areas and analysing
the percentage of the total pupils in the area who attended each sector. 
When calculating the pupil product for each primary school the following calculation is
used: 
[Total no of units] x [PPR] x [ND/D Split Percentage] = Pupil yield for given 
When calculating the pupil product for each high school the following calculation is
used: 
[Total no of units] x [PPR] x [ND/D Split Percentage] = Pupil yield for given 
It should be noted that calculations will be rounded down to the nearest whole number. 
Non-Denominational / Denominational Ratio 
2.19 Using the existing primary school population over the last five years, the education
authority calculates the Non-Denominational/Denominational split which is used to
determine the percentage of pupils from new housing who are anticipated to attend
either school, based on the analysis carried out against the latest school census. 
Cost Per Pupil 
2.20  The costs are based on previous NLC contracted work for new builds and extensions
in North Lanarkshire schools. These figures are updated and adjusted following
completion of the latest projects. The figures will be reviewed annually. An average of
the latest completions is used for developer contribution calculations and are based on
the following new build school calculation which takes the school capacity divided by
the contract cost which equals the cost per pupil 
Contract Cost / School Capacity = Cost per Pupil 
2.21 It should be noted that these figures only relate to ‘build costs’ and do not include any
abnormal costs, land purchase or all design fees.  The BCIS All In Tender Price Index
Page 73 of 146

Page 74

will be used to evaluate and calculate costs for any given year up until the full
contribution has been received. 
2.22 The Guidance outlines the developer contributions calculations in appendix 1 and the
developer contributions school list in appendix 2. These appendices as well as the
figures in relation to the calculations as noted in 2.16 above will be reviewed annually
and if anticipated changes are sought this would be done through committee approval.  
Consultation Procedure
2.23 The Council has to publicise the statutory Supplementary Guidance – Education
Contributions for a period of 6 weeks to make all potentially interested parties aware of
the guidance and give all who wish to do so the opportunity to comment thereon. The
Council will consider any timeous representations made to it on the proposed Education
Contributions Supplementary Guidance. 
2.24 Following the conclusion of the consultation period and subsequent assessment of the
responses, a report will be submitted to the Committee for approval of the finalised
Education Contributions Supplementary Guidance. 
2.25 The Council will send the Scottish Ministers a copy of the Guidance it has approved
and intends to adopt. At that time the Council will also send the Scottish Ministers a
Statement setting out the publicity measures undertaken, the comments received, and
an explanation of how these comments were taken into account. After a period of 28
days from submission has elapsed, the Council may adopt the Supplementary
Guidance Note unless the Scottish Ministers direct otherwise. 
3. Measures of success 
3.1  The measures of success would include:
• Clearer guidelines for developers/applicants/landowners to help ensure that the
requirement for education contributions is appropriately considered at an early
stage.
• Will help developers/applicants/landowners determine development viability and
allow them to factor in the likely cost of education contributions if required.
• Aligns with Government Policy on contributions to infrastructure which is an
important consideration under NPF4.
• It offers the Council a more robust framework to support the Council’s decisions in
relation to any appeals referencing education contribution requirements.
• Can help to increase the efficiency of processing planning applications in terms of
setting the terms for associated legal agreements early that require to be signed
prior to planning consent being issued. 
4. Supporting documentation 
4.1 Draft Supplementary Guidance Note – Education Contributions 
Pamela Humphries
Chief Officer (Place) 
Page 74 of 146

Page 75

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒
Page 75 of 146

Page 76

If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
The proposals seek to enable the Council to provide the resources needed to
ensure that the children of NLC have the best educational resource available
to them. As such it is considered that the guidance is compliant with the
overall aims of the UNCRC and in particular Articles: 
Article 3 Best interests of the Child to be a top priority at all times.
Article 28 Right to Education ensuring Primary education is free.
Article 29 Goals of Education to develop every childs personality, talents and
abilities to their fullest potential. 
Page 76 of 146

Page 77

If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
1. Brief summary of policy/measure? 
The guidance seeks to secure best value for the Council and ensure that the
required education facilities and infrastructure are provided where necessary.
The guidance promotes good practice on pupil yield evidence and
engagement with developers to deliver any necessary expansion or new
build schools as a direct result of the impact on the school estate from new
housing developments. 
2. What aspects of the policy/measure will affect children and young
people up to age 18? 
The Guidance seeks to ensure all primary and secondary age children have
the required educational infrastructure to ensure that they receive the best
education possible within the NLC area. 
3. What likely impact, direct or indirect, will the policy/measure have on
children and young people? 
It is envisaged that the guidance will have a positive impact on children both
directly and indirectly given that is seeks to secure best value for the Council
and ensure that the required education facilities and infrastructure are
provided where necessary. The guidance promotes good practice on pupil
yield evidence and engagement with developers to deliver any necessary
expansion or new build schools as a direct result of the impact on the school
estate from new housing developments. 
4. Which groups of children and young people will be affected? 
The groups affected by this guidance are 5 to 18 year olds. 
Yes ☐ No ☒ 
Page 77 of 146

Page 78

Education 
Contributions
September 2023
Supplementary Guidance 
Page 78 of 146

Page 79

1 
Introduction ........................................................................................................ 2
Education Establishments .................................................................................. 2
What are Contributions ....................................................................................... 3
Planning Policy ................................................................................................... 3
Implementation ................................................................................................... 7
Development Viability………………………………………………………………….7
Contribution Trigger ............................................................................................ 8
Calculations ........................................................................................................ 8
Useful Contacts  ............................................................................................... 10 
Appendices
Appendix 1 – Developer Contribution Calculations  .................................... 11
Appendix 2 – Developer Contribution School List  ...................................... 15       
Appendix 3 – Development Viability……………………………………………21 
CONTENTS
Page 79 of 146

Page 80

2 
Introduction
This publication provides statutory Supplementary Guidance from North Lanarkshire Council
on developer contributions for education infrastructure. The guidance promotes good practice
on pupil yield evidence and engagement with developers and planning authorities in order to
deliver any necessary expansion or new build schools as a direct result of the impact on the
school estate from new housing developments. 
North Lanarkshire Council is committed to providing the highest quality of education within its
establishments and developer contributions for education are required to help mitigate the
impact of developments on the education estate. This will allow the correct infrastructure to be
put in place to support the additional pupil product from new developments and their impact on
the educational estate.  
The introduction of any new development can have a significant impact on a wide variety of
existing infrastructure, facilities, services and amenities and in such circumstances where it
can be justified the Council will seek developer contributions to offset such impacts. 
Residential housing developments can place additional requirements and result in capacity
constraints on the education services of the Council. This guidance outlines the circumstances
in which residential development proposals are required to be assessed in terms of their
impact on the capacity of the education estate and the ability to accommodate the pupils
generated by the development in the local schools. All qualifying residential developments of 5
or more units will be assessed with regards to their impact on the education estate. 
Education Establishments
North Lanarkshire Council currently provides an education service across the authority through
secondary schools, primary schools and pre-five establishments. 
The council will seek to secure contributions for areas of education infrastructure in Primary
and Secondary areas where required. These will be requested where capacity issues are
identified through the cumulative impact of all emerging housing developments identified
through the Housing Land Audit and Local Development Plan. 
The developer contributions will be required to contribute towards providing additional capacity
through the provision of a new build school, permanent additional classrooms (extensions or
modular accommodation) and adaptations to existing schools.  Page 80 of 146

Page 81

3 
What are Contributions
In order for developer contributions to be secured, North Lanarkshire Council require
developers to enter into a contract to offset adverse impacts of their project. 
In Scotland, they are most commonly (though not exclusively) made under Section 75 of the
Town and Country Planning (Scotland) Act 1997. Section 75 agreements are used where
conditions attached to the planning permission itself are not appropriate. While planning
conditions control how a project is built and used, Section 75 agreements tend to provide for
financial contributions and any requirements affecting land outside the area to which the
planning permission relates, such as education infrastructure.
Planning Policy
This supplementary guidance has been prepared within the context of the following:
• National Planning Framework 4 (NPF4);
• Circular 3/2012: Planning Obligations and Good Neighbour Agreements (Revised
2020); and 
• North Lanarkshire Local Development Plan (NLLDP) 2022
National Planning Framework 4
NPF4 was adopted on the 13th February 2023 and forms part of the statutory Development
Plan (alongside the Local Development Plan) and is required to be considered when
determining planning applications. In the event of any incompatibility between NPF4 and the
adopted NLLDP 2022, it should be noted that the NPF4 policy position will supersede the
policies in the NLLDP.
Whilst there are several policy overlaps between NPF4 and the adopted NLLDP 2022, it is
considered that Policy 18 Infrastructure First of NPF4 most closely aligns with the
requirements of Policy CI Contributions to Infrastructure of the NLLDP 2022.
NPF4 Policy 18 Infrastructure First outlines that:
“a) Development proposals which provide (or contribute to) infrastructure in line with that
identified as necessary in LDPs and their delivery programmes will be supported.
Page 81 of 146

Page 82

4 
b) The impacts of development proposals on infrastructure should be mitigated. Development
proposals will only be supported where it can be demonstrated that provision is made to address
the impacts on infrastructure. Where planning conditions, planning obligations, or other legal
agreements are to be used, the relevant tests will apply.
Where planning obligations are entered into, they should meet the following tests:
- be necessary to make proposed development acceptable in planning terms
- serve a planning purpose 
- relate to the impacts of the proposed development 
- fairly and reasonably relate in scale and kind to the proposed development 
- be reasonable in all other respects
Planning conditions should only be imposed where they meet all of the following tests. They
should be:
- necessary
- relevant to planning
- relevant to the development permitted
- enforceable
- precise
- reasonable in all other respects”
Circular 3/2012 Planning Obligations and Good Neighbour Agreements (Revised 2020)
Planning Circular 3/2012: Planning Obligations and Good Neighbour Agreements (Revised
2020) outlines that Local Authorities may use agreements under Section 75 of the Town &
Country Planning (Scotland) Act 1997 to offset the impact of new development.
The use of an agreement under Section 75 of the Town & Country Planning (Scotland) Act
1997 (hereinafter referred to as the ‘Section 75 Agreement’) to help deliver necessary
infrastructure and facilities is considered a legitimate planning objective by the Scottish
Government. However, Section 75 Agreements should only be sought where they are required
to make a proposal acceptable in land use planning terms and where the use of a planning
condition, including a suspensive condition, is not appropriate. Conditions, including
suspensive conditions, should be used wherever possible. Section 75 Agreements should only
be sought where they meet the following tests:
• Be necessary to make the proposed development acceptable in planning terms. Page 82 of 146

Page 83

5 
• Shall serve a planning purpose and, where it is possible to identify infrastructure
provision requirements in advance, should relate to development plans.
• Shall relate to the proposed development either as a direct consequence of the
development or arising from the cumulative impact of development in an area.
• Shall fairly and reasonably relate in scale and kind to the proposed development.
• Be reasonable in all other aspects.
It is acknowledged that Section 75 Agreements can at times, cause delays in the planning
process and place an additional financial burden on developers. In order to minimise delays
and any financial burden the requirement for planning obligations should be identified as soon
as possible – ideally at the pre-application stage - and relevant parties brought together to
ensure that the process flows as smoothly as possible. In addition, it is recommended that
timescales for any legal agreement be included where possible within a planning processing
agreement in order that the applicant has a reasonable expectation on the delivery timescales
for their decision – provided they too adhere to the agreed timescales for provision of
supporting information. The timescale for completion of a legal agreement will be no more than
6 months from the date of committee approval unless exceptional circumstances require
additional time for its signing.
It should be noted that the requirement for and level of contribution (if necessary in
terms of education infrastructure) can only be confirmed once a valid planning
application has been submitted and a consultation response from NLC Education
confirms the current position to the Planning Authority.  However, guidance as to
whether an Education contribution is likely to be required will be provided at the Pre
Application process.
In some circumstances it may be possible to expedite this process by use of an agreement
under section 69 of the Local Government (Scotland) Act 1973 to achieve contributions
towards provision of necessary infrastructure and facilities. Section 69 of the Local
Government (Scotland) Act 1973 states that: ‘(1)…a local authority shall have power to do
anything (whether or not involving the expenditure, borrowing or lending of money or
the acquisition or disposal of any property or rights) which is calculated to facilitate, or
is conducive or incidental to, the discharge of any of their functions.’
This provision provides the Council with a general power to enter into an Agreement with
developers to secure the above contributions prior to the release of the planning consent. This
type of Agreement does not have to be limited in its purpose to the restriction or regulation of
the development or use of the land subject to the planning application and could also include
the payment of money.  Page 83 of 146

Page 84

6 
North Lanarkshire Local Development Plan 2022
The NLLDP CI Policy Contributions to Infrastructure outlines that:
“North Lanarkshire Council will seek to secure developer contributions for new developments
that, individually or cumulatively, generate a requirement for new or enhanced infrastructure or
services, covering Affordable Housing in Cumbernauld Housing Sub-Market Area, and
Education, Transport and Green Network Infrastructure, Amenity Space and Play across North
Lanarkshire.
Where new development is proposed that, individually or cumulatively, generates a
requirement for new or enhanced infrastructure or services in the categories listed, developers
will be expected to contribute towards the provision of the required infrastructure, facilities and
services. This will include any infrastructure to be provided in advance of development
proposed in this Plan.
Developer contributions will be sought through a legal agreement or planning condition and in
accordance with the five tests of Circular 3/2012 – “Planning Obligations and Good Neighbour
Agreements”, as outlined by the Scottish Government and in accordance with this Guidance. 
Any information provided to developers by the Council before the application stage is only
indicative, including the Action Programme for the delivery of those housing sites identified in
this Plan.”
Policy CI 1 Category Education
“For proposed residential developments the Council is seeking education infrastructure
contributions, through Legal Agreements or planning conditions, based on adaptations and
new builds within our Schools and Centres 21 Programme and the identified solutions to deal
with the impact of all known future development within the catchment areas. This may include
contribution(s) towards early years provision, due to the increase in provision by 2020 outlined
in the Children and Young People Act 2014. It should be noted that any potential need
identified is based on known future housing provision and could be affected if additional units
come forward as a result of housing sites that have not been identified through the Plan
process.
A contribution towards education infrastructure will be expected for all dwellings, with the
exception of those with only one bedroom. Indicative conditions attached to any agreement will Page 84 of 146

Page 85

7 
include the education authority retaining any payment for a period of 10 years or as otherwise
agreed with the Council, following the completion of the final dwelling, after which time the
payment would be returned to the applicant if not spent. Phased payments may be acceptable
in most instances. 
Full details of any infrastructure and contribution requirements will be identified by the Council
as Education Authority on a case-by-case basis through the Development Management
process.”
Implementation
When a planning application relating to development is submitted to the Council for
consideration, it will be assessed to determine if there is a requirement for the prospective
developer to make an appropriate developer contribution in accordance with the provisions of
this supplementary guidance. 
Development contributions will be sought for a contribution towards education infrastructure for
all dwellings, except for developments that are within one of the following categories which are
exempt from education developer contributions:
• One bedroom Dwellings;
• Proposals of fewer than 5 Dwellings;
• Change of use, conversion or redevelopment whereby no additional residential units are
constructed;
• Development that would not put capacity pressures on schools e.g. Student
accommodation linked to college/universities, housing for the elderly or dwellings with
occupancy restrictions that prohibit children of nursery or school age.
• Non-residential development.
Phased contributions will be acceptable in most instances and indicative conditions attached to
any agreement to include the education authority retaining any payment for a period of 10
years or as otherwise agreed with the Council, following the completion of the final dwelling,
after which time the payment would be returned to the applicant if not spent or committed in
full by the Council within 28 days of receipt of a written request from the applicant.
For the avoidance of doubt all developer contributions will be index linked to inflation
from the point of the Council being minded to grant planning permission (“Index
meaning the All-in Tender Price Index as published by the Building Cost Information
Service of the Royal Institution of Chartered Surveyors on a quarterly basis;). Page 85 of 146

Page 86

8 
Development Viability
North Lanarkshire Council acknowledges that unforeseen or abnormal development costs can
affect development viability and may take this into account dependent on the specific
circumstances. Only in very exceptional circumstances where there are excessive, abnormal
costs on sites that are designated for housing or within the urban area boundary in the North
Lanarkshire local Development Plan 2022, it is likely that the Council will consider a reduction
or give an exemption from the requirement for an education contribution. 
In circumstances where a developer considers that development viability is compromised by
the requirement for an education contribution there is a requirement for developers to
undertake a full viability appraisal at the outset of their development which considers all likely
costs including any other developer obligations including affordable housing if applicable. 
Standard development costs such as demolition works, retaining and ground works,
landscaping, archaeological investigations, drainage works, site purchase, site servicing and
flood prevention works will not normally be accepted as abnormal costs. It is expected, and will
require to be demonstrated, that the cost of preparing and developing land, including
reasonably known ‘abnormal’ costs have been reflected in the purchase price/valuation of the
land. 
The process to be followed where a developer is seeking an exemption from paying the
required education contribution is set out in Appendix 3 of this Supplementary Guidance. 
Contribution Trigger
The cumulative impact assessment of emerging housing identifies those schools where it is
anticipated that the pupils generated by housing allocations (programmed up by the current
Housing Land Audit and Local Development Plan), will increase school capacity beyond 90%.
Developer contributions for Education will be sought for infrastructure within these school
catchment areas towards the projected pupils generated above 90% of the school capacity.
The cost of these pupils is shared across the residential units (programmed in line with the
current Housing Land Audit and Local Development Plan) within the catchment area. 
Page 86 of 146

Page 87

9 
Calculations
The contribution is calculated using the Pupil Product Ratio against the number of houses
planned within the catchment area of each school. The number of pupils generated is added to
the current number of children in each school to calculate the overall percentage capacity. 
The number of spaces is proportionated against each school based on the
Denominational/Non-Denominational split. This is calculated annually and based on a rolling
five-year average. If the occupancy is identified to exceed 90% then a developer contribution
will be required. If it is below 90% then a contribution is unlikely. If a school already exceeds
90% then a contribution will be required. 
The example of how the developer contributions are calculated appear in Appendix 1. 
Pupil Product Ratio (PPR) 
The PPR is the number which identifies the average number of pupils relative to new areas of
housing. Contributions are based on the anticipated number of residential units to generate
children of school age (the anticipated number is represented as a pupil product ratio per
property). The PPR used in North Lanarkshire for each age range is as follows: 
*The figures below are used for example purposes only and are intended to
demonstrate the calculation. For the most up to date figures please refer to
https://www.northlanarkshire.gov.uk/planning-and-building/planning-
applications/our-supplementary-planning-guidance 
*Primary School: 0.3
*Secondary School: 0.24
*These numbers are used as examples for the calculations 
In order to achieve the correct calculation for each school the number of units within a
development is multiplied by the Pupil Product ratio to project the total number of pupils
anticipated to present for both primary and secondary education. The total is then split by the
5-year average Non-Denominational/Denominational ratio. The five-year average ratio is
calculated by looking at the pupils in geographical areas and analysing the percentage of the
total pupils in the area who attended each sector.   
When calculating the pupil product for each primary school the following calculation is used: 
[Total no of units] x [PPR] x [ND/D Split Percentage] = Pupil yield for given school 
Page 87 of 146

Page 88

10 
When calculating the pupil product for each high school the following calculation is used: 
[Total no of units] x [PPR] x [ND/D Split Percentage] = Pupil yield for given school
Calculations will be rounded down to the nearest whole number. 
Non-Denominational/Denominational Ratio  
Using the existing primary school population over the last five years, the education authority
calculates the Non-Denominational/Denominational split which is used to determine the
percentage of pupils from new housing who are anticipated to attend either school. Based on
the analysis carried out against the latest school census. 
Cost Per Pupil 
Costs are based on previous NLC contracted work for new builds and extensions in North
Lanarkshire schools. These figures are updated and adjusted following completion of the latest
projects. The figures will be reviewed annually. An average of the latest completions is used
for developer contribution calculations and are based on the following information: 
New Build School calculation   
Contract Cost/School Capacity = Cost per pupil 
*These figures are used as examples for the calculations. Formal requests should be made to
ef.forwardplanning@northlan.gov.uk 
** It should be noted that these figures only relate to ‘build costs’. It does not include any abnormal costs, land purchase or all
design fees. 
Developer Contribution Calculations are shown in Appendix 1 
Developer Contribution School List is shown in Appendix 2 
Page 88 of 146

Page 89

11 
Useful Contacts
For further advice on this Supplementary Planning Guidance and its applications, please
contact: 
For queries relating to planning applications and development viability. 
Planning & Place
Civic Centre
Windmillhill Street 
Motherwell
ML1 1AB
Planningenquiry@northlan.gov.uk 
For queries relating to pre-application enquiries. 
Pre-application advice | North Lanarkshire Council 
For queries relating to the developer contribution figures, calculations or school list. 
Forward Planning (Education)
Civic Centre
Windmillhill Street
Motherwell
ML1 1AB
ef.forwardplanning@northlan.gov.uk 
For general matters. 
North Lanarkshire Council Website
http://www.northlanarkshire.gov.uk 
Page 89 of 146

Page 90

12 
Appendix 1 – Developer Contribution Calculations 
New Builds 
Reference
Site
School
Capacity Contract Cost Cost Per
Pupil
A 1522 £36,511,169 £23,988.94
B 1161 £33,071,295 £28,485.18
C 1117 £27,011,646 £24,182.32
D 484 £19,954,327 £41,227.95
E 434 £24,821,452 £57,192.29
F 509 £18,577,215 £36,497.48
Average   £35,262.36 
Contributions rounded down to £35,000 per pupil 
Cost per Unit 
£35,000 * 0.3 (PPR) = £10,500 per unit for Primary School Contribution 
£35,000 * 0.24 (PPR) = £8,400 per unit for Secondary School Contribution 
The calculation for Extensions/Additional Capacity to PPP and Non-PPP schools are based on
the following information 
Page 90 of 146

Page 91

13 
Extensions/ Additional Capacity - Non PPP School 
Reference
Site 
GIFA Contract
Cost
Cost Per
Sqm
Design Fees
A 235 £610,584 £2,598.23 14%
B 184 £774,000 £4,206.52 14%
C 93 £311,000 £3,344.09 14%
Average 171 £565,195 £3,382.95 
Cost per square metre = £3,382.95 
Design Fee = 14% 
Cost per square metre including design fees = £3,855.42 
Square metres required for each class = 
57sqm classroom + 3sqm cloaks + 10sqm toilets and circulation = 70sqm 
Cost per classroom = £3,855.42 * 70 sqm = £269,883.60 
Each classroom is anticipated to accommodate minimum 25 pupils 
Cost per pupil = £269,883.60 / 25 = £10,795.34 
Cost per unit = £10,795.34 * 0.3 (PPR) = £3238.60 per unit for Primary School Contribution  
£10,795.34 * 0.24 (PPR) = £2590,88 Secondary per unit for School Contribution 
Page 91 of 146

Page 92

14 
Extensions / Additional Capacity - PPP School
North Lanarkshire has 25 PPP schools which are owned by external stakeholders. These
schools are subject to additional costs when making adaptations to the buildings for ongoing
revenue and life cycle costs. The total additional cost is £35,840 per classroom
Cost per classroom = £3,855.42 * 70 sqm = £269,883.60 + £35,840 = £305,723.60 
Each classroom is anticipated to accommodate minimum 25 pupils 
Cost per pupil = £305,723.60 / 25 = £12,228.94 
Cost per unit =   £12,228.94 * (PPR) = £3668.68 Primary School Contribution     
£12,228.94 * (PPR) = £2934.95 Secondary School Contribution 
The table below provides the sum of the costs to developers based on all calculations. 
Total Build Cost per pupil – As at March 2023* 
New Build Capacity Improvement
PPP School
Capacity Improvement
Non-PPP School
Primary £35,000 £12,228.94 £10,795.34
Secondary £35,000 £12,228.94 £10,795.34    
*these figures will be reviewed annually, and BCIS Index linked 
Total Build Cost per unit – As at March 2023* 
New Build Capacity Improvement
PPP School
Capacity Improvement
Non-PPP School
Primary £10,500 £3,668.68 £3,238.60
Secondary £8,400 £2,934.95 £2,590.88    
*these figures will be reviewed annually, and BCIS Index linked 
It should be noted that these figures only relate to ‘build costs’. It does not include any land
purchase or all design fees. The BCIS All In Tender Price Index will be used to evaluate and
calculate costs for any given year up until the full contribution has been received. 
A full school list is provided in Appendix 2 which identifies if a developer contribution is
required or not. 
Page 92 of 146

Page 93

15 
Appendix 2 – Developer Contribution School List (As at Sept 
2023)
Cluster PPP / Non PPP School Contribution
Requested
Airdrie Academy PPP Airdrie Academy No  
Non PPP Chapelside PS No  
Non PPP Golfhill PS No  
Non PPP Greengairs PS Yes  
Non PPP New Monkland PS No  
Non PPP Rochsolloch PS Yes  
Non PPP Tollbrae PS No  
Non PPP Victoria PS No
Bellshill Academy Non PPP Lawmuir PS No  
Non PPP Mossend SP Yes  
Non PPP Noble PS No  
Non PPP Bellshill Academy No
Braidhurst HS Non PPP Braidhurst HS No  
Non PPP Logans PS No  
Non PPP Muir Street PS No
Brannock HS Non PPP Brannock HS Yes  
Non PPP Holytown PS Yes  
Non PPP Keir Hardie Memorial
PS Yes  
PPP New Stevenston PS Yes  
Non PPP Newarthill PS No
Calderhead HS Non PPP Alexander Peden PS Yes  
Non PPP Allanton PS No  
Non PPP Calderhead HS No  
Non PPP Dykehead PS No  
Non PPP Kirk 'O' Shotts PS No  
Non PPP Stane PS Yes  
Page 93 of 146

Page 94

16 
Cluster PPP / Non
PPP School Contribution
Requested
Caldervale HS Non PPP Calderbank PS No  
Non PPP Caldervale HS Yes  
PPP Chapelhall PS Yes  
PPP Clarkston PS Yes  
PPP Glengowan PS Yes  
Non PPP Hilltop PS No  
PPP Plains PS No
Cardinal Newman HS Non PPP Cardinal Newman HS No  
Non PPP Holy Family PS No  
Non PPP Sacred Heart PS No  
Non PPP St Gerard's PS No  
Non PPP St John Paul II PS No
Chryston HS Non PPP Chryston HS Yes  
Non PPP Chryston PS Yes  
Non PPP Gartcosh PS Yes  
Non PPP Glenmanor PS Yes  
PPP Stepps PS Yes
Clyde Valley HS Non PPP Berryhill PS Yes  
Non PPP Clyde Valley HS Yes  
Non PPP Morningside PS Yes  
Non PPP Muirhouse PS No  
Non PPP Netherton PS Yes  
Non PPP Newmains PS Yes  
Non PPP Orchard PS Yes  
Non PPP Thornlie PS No  
PPP Wishaw Academy PS Yes  
Page 94 of 146

Page 95

17 
Cluster PPP / Non
PPP School Contribution
Requested
Coatbridge HS PPP Bargeddie PS Yes  
Non PPP Carnbroe PS Yes  
PPP Coatbridge HS Yes  
PPP Glenboig PS Yes  
Non PPP Greenhill PS No  
Non PPP Kirkshaws PS No  
Non PPP Langloan PS No  
Non PPP Old Monkland PS No  
Non PPP Shawhead PS No  
Non PPP Sikeside PS No  
Non PPP Townhead PS No
Coltness HS PPP Calderbridge PS No  
PPP Cambusnethan PS No  
Non PPP Cleland PS Yes  
Non PPP Coltness HS No
Cumbernauld
Academy Non PPP Abronhill PS No  
Non PPP Carbrain PS No  
Non PPP Cumbernauld
Academy Yes  
Non PPP Cumbernauld PS No  
Non PPP Kildrum PS No  
Non PPP Whitelees PS No
Dalziel HS Non PPP Dalziel HS Yes  
Non PPP Glencairn PS Yes  
Non PPP Knowetop PS Yes
Greenfaulds HS Non PPP Baird Memorial PS No  
Non PPP Condorrat PS No  
Non PPP Eastfield PS No  
Non PPP Greenfaulds HS No  
Non PPP St Helen's PS No  
Non PPP Westfield PS No Page 95 of 146

Page 96

18 
Non PPP Woodlands PS No  
Page 96 of 146

Page 97

19 
Cluster PPP / Non
PPP School Contribution
Requested
Kilsyth Academy Non PPP Balmalloch PS No  
Non PPP Banton PS No  
Non PPP Chapelgreen PS No  
Non PPP Kilsyth Academy No  
Non PPP Kilsyth PS No
Lenzie Academy Non PPP Auchinloch PS Yes
OLHS -
Cumbernauld Non PPP OLHS Cumbernauld Yes  
Non PPP St Andrew's PS No  
Non PPP St Barbara's PS Yes  
Non PPP St Joseph's PS Yes  
Non PPP St Lucy's PS Yes  
Non PPP St Margaret of Scotland PS No  
Non PPP St Mary's PS Cumbernauld No
OLHS - Motherwell Non PPP Cathedral PS Yes  
Non PPP OLHS Motherwell No  
Non PPP St Bernadette's PS No  
Non PPP St Brendan's PS No
Split Catchment Non PPP Ladywell PS Yes
Split Catchment Non PPP Ravenswood PS No
St Aidan's HS Non PPP St Aidan's HS No  
Non PPP St Aidan's PS No  
Non PPP St Brigid's PS No  
PPP St Ignatius PS No  
Non PPP St Mary's PS Cleland No  
Non PPP St Patrick's PS Shotts No  
Non PPP St Thomas' PS Yes
St Ambrose HS Non PPP St Ambrose HS No  
Non PPP St Augustine's PS No  
Non PPP St Bartholomew's PS No  
PPP St Kevin's PS Yes     
Page 97 of 146

Page 98

20 
Cluster PPP / Non
PPP School Contribution
Requested
St Andrew's HS Non PPP Corpus Christi PS No  
PPP OL & St Joseph's PS Yes  
PPP St Andrew's HS No  
Non PPP St Bernard's PS No  
Non PPP St Mary's PS Coatbridge Yes  
Non PPP St Monica's PS No  
Non PPP St Patrick's PS Coatbridge Yes  
Non PPP St Stephen's PS Yes  
PPP St Timothy's PS No
St Margaret's HS Non PPP All Saint's PS Yes  
PPP St Aloysius PS No  
Non PPP St Andrew's PS No  
PPP St David's PS Yes  
Non PPP St Dominic's PS No  
Non PPP St Edward's PS No  
Non PPP St Margaret's HS No  
PPP St Mary's PS Caldercruix No  
Non PPP St Serf's PS No
St Maurice's HS Non PPP Holy Cross PS No  
Non PPP St Maurice's HS No  
Non PPP St Michael's PS Yes  
PPP St Patrick's PS Kilsyth No
Taylor HS Non PPP Christ the King PS Yes  
Non PPP OL & St Francis PS No  
PPP St Patrick's PS New
Stevenston Yes  
Non PPP St Teresa's PS Yes  
Non PPP Taylor HS Yes
Uddingston
Grammar Non PPP Aitkenhead PS No  
PPP Tannochside PS No Page 98 of 146

Page 99

21 
Appendix 3 – Development Viability 
Development Viability Statement Requirements 
Where a developer is seeking an exemption or reduction of the education contribution on the
basis of economic viability then the following information will be required: 
• An independent and verified Development Viability Statement undertaken by the DV or
mutually agreed suitably qualified consultant. This allows a comparison of costs to be
evaluated against projected house values and should also set out in detail why any
abnormal development costs cannot be met from either a reduction in purchase price for
the site and/or developer profit margins. This should include an explanation of financial
assumptions and an explanatory note on all appraisal assumptions. The report should
detail the financial implications of the additional costs and their implications for the viability
of the development. 
• A certified dated copy of the original viability appraisal setting out the allowances made for
developer obligations and affordable housing policy (if applicable) and compatibility with
prevailing policy requirements. 
• From a RICS accredited firm a Quantity Surveyor’s (QS) detailed cost budget on
development costs e.g., externals, infrastructure, and abnormal costs which include a
detailed breakdown, produced in accordance with RICS published costing data and with
regard to the recommended practice set out in the RICS Practice Statement Financial
Viability in Planning: Conduct and Reporting (2021) (RICS FVIP). 
• Verified site valuation at the time of the application submission. 
• Projected market valuations for each property within the development (with supporting
evidence). 
• An indication of the timescales within which each property would be marketed and sold
and, where appropriate, development phasing information. 
• Design and Access statement (if applicable and available).  Page 99 of 146

Page 100

22 
• Build specification. 
• Assumptions on all grant funding and (where appropriate) evidence of
transactions/negotiations with RSL’s. 
The confidential and sensitive nature of some financial information is acknowledged, and the
content of the Assessment will remain confidential between the applicant and named officials
within the Council, District Valuer or other third-party advisor as agreed and the relevant
decision makers and committees. 
As a public body, however, the Council will require to comply with the terms of the Freedom
of Information (Scotland) Act 2002 and the Environmental Information (Scotland) Regulations
2004 in relation to any request for disclosure of such information. Any applicable exemptions
or exceptions under the legislation will be appropriately applied. Any requests received for
such disclosure of information shall be considered on a case by case basis. 
Viability Assessment and Outcomes 
Once an agreed Development Viability Statement and supporting information is received by
the Council it will be considered. If the applicant submits their own independent Development
Viability Statement that has not been agreed in advance with the Council as being carried out
by a suitably independent source then it will be independently reviewed by the District Valuer
Service (DVS) or an alternative third-party advisor agreed by, and acting on behalf of the
Council. This will be carried out at the developers’ expense with costs determined on an
individual basis. The requirement for independent verification of Viability Assessments will
only be removed where the time and cost associated with this process is disproportionate to
the amount of developer contribution required. 
Each case will be determined by the Council on its own merits. The outcome of the Viability
Assessment independent review will not be binding on the Council but may inform any
recommendation to the appropriate planning decision maker. If the exercise establishes there
are viability issues with the development as a result of the Education contribution
requirement, the council will then have to determine if the shortfall in the education
requirements can be borne by the Council and/or its partners as ultimately the impact of the
development will need to be mitigated and paid for. In event that the Council can support the
viability, it will proceed with such a recommendation but ultimately if the infrastructure cannot
be funded to offset the impact of development, then the site will be required to be deferred
until such time as the site can become viable on its own merits.
Page 100 of 146

Page 101

23 
For the avoidance of doubt the agreement to waive a contribution towards education
provision would be for a timescale specified within the contribution waiver agreement (3 to 5
years maximum depending on the number of units to be constructed) and starting from the
date of planning permission being granted. The Council would reserve the right to seek an
updated Viability Assessment independent review at the end of the specified period and
every 3-5 years for the duration of the planning permission or until site completion. Should
the updated viability assessment show that the viability of the site had changed then the
Council would reserve the right to withdraw a waiver on the remaining units still to be
constructed and it would be expected that a contribution at the current established rate would
be required for the remaining units. 
Land Value 
The price paid for land is not a justification for failing to accord with development plan
policies. 
The Royal Institute of Chartered Surveyors (RICS) guidance on Financial Viability in
Planning, Guidance Note (1st Edition- GN94/2012 - abbreviated to RICS FVIP) and now
updated, at [para 1.2.4] of Assessing Viability confirms this, and the District Valuer (DV) or an
alternative third-party advisor agreed by, and acting on behalf of the Council when instructed
by the Council will adopt and use the RICS’s guidance as the most appropriate. The use of
the DV in this way is supported by paragraph 22 of PAN 2/2010 setting out this as
recommended good practice. 
It should be noted that financial viability can have regard to not just a single policy’s
impacts but the cumulative impact of policy requirements and developer contributions.
In terms of viability however all of these policy documents only recognise a departure
from the policy requirements for provision of a developer obligation for education and
to address viability and no other policy requirement. 
Page 101 of 146

Page 102

Page 102 of 146

Page 103

North Lanarkshire Council
Report
Planning Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref     Date 12/10/23 
Scottish Government Directions on Finalised Supplementary
Guidance: Planning and Noise and Affordable Housing 
From  Pamela Humphries, Chief Officer (Place)  
E-mail laingg@northlan.gov.uk Telephone Gordon Laing,
07970018874 
Executive Summary
The purpose of this report is to update the Committee on the outcome of the consultation
with the Scottish Government on the Supplementary Guidance Documents:  Planning and
Noise and Affordable Housing. 
The report outlines a summary of the directions received from the Scottish Government
and the amendments made to the guidance as a consequence of those directions. 
Recommendations
It is recommended that the Committee: 
1) Note the changes to the finalised Supplementary Guidance requested by the
Scottish Government and that the approved Supplementary Guidance Documents
will now be published. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (14) Ensure the highest standards of public protection
Programme of Work Sustainable Futures
Item 5
Page 103 of 146

Page 104

1. Background 
Public Consultation 
1.1 A six-week public consultation was undertaken between the 3rd April and 17th May on
the two Supplementary Guidance Documents: Planning and Noise and Affordable
Housing. The Supplementary Guidance documents were available to view at the Civic
Centre and all public libraries within North Lanarkshire, the consultation was advertised
in all the local newspapers, publicised on the Council’s social media platforms and
response surveys were accessible via the Council’s live consultations page via the
Council website. Subsequent to the public consultation the guidance was amended
where necessary and submitted to the Planning Committee for final approval. 
1.2 Members will note that the finalised guidance was approved by the Planning Committee
on the 29th June 2023. 
Scottish Government Consultation 
1.3 The finalised Supplementary Guidance: Planning and Noise and Affordable Housing
were submitted to the Scottish Government for approval on the 20th July 2023.  
1.4 The Scottish Government confirmed on the 8th of September 2023 that the
supplementary guidance Planning and Noise may not be adopted until modifications
specified in Annex A to their notice had been made and the reasons for the
modifications were also set out in Annex A. 
1.5 The Scottish Government confirmed on the 8th of September 2023 that the Scottish
Ministers do not propose to issue a direction in relation to supplementary guidance
Affordable Housing. 
2. Report 
Scottish Government Directions Planning and Noise Supplementary Guidance 
Modification 1: 
2.1 Modify paragraph 1.1 of the supplementary guidance to read: 
“This Supplementary Guidance (SG) forms part of the Development Plan and is a
statutory requirement in the determination of planning applications” 
Reason: To align with the Town and Country Planning (Scotland) Act 1997 
Modification 2: 
2.2 Modify paragraph 1.2 of the supplementary guidance to read: 
“The SG expands upon the following North Lanarkshire Council Local Development
Plan policies: 
Status
• Policy EDQ 2C – Management Areas
• Policy EDQ 3 (part e) – Quality of Development, Guidance” 
Reason: To align with North Lanarkshire Local Development Plan (July 2022)
Page 104 of 146

Page 105

Modification 3: 
2.3 Modify paragraph 3.2.1 of the supplementary guidance to read: 
“Local Development Plan. The Town and Country Planning (Scotland) Act 1997 (as
amended by the Planning etc (Scotland) Acts 2006 and 2019) and its associated
regulations requires local authorities to produce a local development plan, setting out
the Council’s detailed policies and proposals for the use, development, protection and
improvement of land. North Lanarkshire Council adopted its Local Development Plan
on 6th July 2022. Section 22 of The Town and Country Planning Act 1997 allows local
authorities to adopt and issue guidance attached to a local development plan. Section
22 is continued in effect to enable the adoption of certain supplementary guidance until
31 March 2025 by regulation 4 of the Planning (Scotland) Act 2019 (Commencement
No. 11 and Saving and Transitional Provisions) Regulations 2023.” 
Reason: To align with the Town and Country Planning (Scotland) Act 1997 as
amended by the Planning (Scotland) Act 2019. 
Modification 4: 
2.4 Modify paragraph 4.1 of the supplementary guidance to read: 
“Noise must be a material consideration in any planning application when:” 
Reason: To align with Circular 3/2022 which sets out that possible material
considerations include environmental impacts of the proposed development. This
applies to the subsequent bullet points covering noise sensitive development and noise
generating development. 
Modification 5: 
2.5 Modify paragraph 4.2 of the supplementary guidance to read: 
“Noise sensitive uses may include a residential area, school or hospital while noise
generating uses are likely to be cultural venues (including live music venues), noisy
roads, railways, industrial and commercial sites.” 
Reason: To align with Section 41A – Conditional grant of planning permission: noise
sensitive developments of the Town and Country Planning (Scotland) Act 1997 as
amended by the Planning (Scotland) Act 2019. 
Modification 6: 
2.6 Modify part a) and e) of paragraph 4.9 of the supplementary guidance to read: 
“At the very least this should include exploring the potential for: 
a) orientating the proposed buildings to reduce noise impact.
b) the use of barriers and bunds to reduce the noise level at the noise sensitive
receptor.
c) designing the internal layout to place habitable rooms away from the line of site of
any noise sources
d) use of insulation of the building envelope to mitigate noise
and
e) reducing the noise at source”
Page 105 of 146

Page 106

Reason: To align with Section 41A – Conditional grant of planning permission: noise
sensitive developments of the Town and Country Planning (Scotland) Act 1997 as
amended by the Planning (Scotland) Act 2019. 
Modification 7: 
2.7 Modify paragraph 5.2.4 of the supplementary guidance to read: 
“It is desirable that external noise levels in gardens, patios and amenity space of
residential properties do not exceed 50 dB LAeq,T, with an upper guideline value of 55
dB LAeq,T, where T is the daytime period of 16 hours, 07:00 to 23:00, development
that cannot meet these guidelines should be avoided. Where proposed development
cannot meet these criteria with the provision of the most effective noise mitigation
measures in place, the number of affected properties and the level to which the
guideline is exceeded, the following factors will be considered, by the planning authority
when determining the suitability of the development: 
• The number of affected properties;
• The level by which the guidelines are exceeded;
• The impact on the amenity and wellbeing of the occupiers, in the context of all the
proposed mitigation measures for the property.” 
Reason: To align with Policy 23 of NPF4. 
Modification 8: 
2.8 Modify the table at 5.2.5 of the supplementary guidance to include “Rail Traffic” under
sound source in column 1 and “Internally Night time: LAmax= 45 dB ***” in Rail Traffic
Row 3, column 3. 
(See Notice of Intention to Adopt – Supplementary Guidance – Planning and Noise.
Scottish Government correspondence dated 8th September 2023 Annex A Modification
8) 
Scottish Government Direction Affordable Housing Supplementary Guidance 
2.9  No proposed directions in relation to this document. 
3. Measures of success 
Planning and Noise Supplementary Guidance 
3.1  The measures of success are that the finalised Supplementary Guidance will ensure
that: 
• The consultation responses have been carefully considered and responded to.
• Clearer guidelines for applicants to help ensure noise is appropriately considered at
the earliest stage of design development.
• Gives the Service a framework to offer advice on the likely impacts of development
in terms of noise and consistency of approach.
• Less likelihood of noise complaints associated with new developments.
• Aligns with Government Guidance on health impacts of development which is an
important consideration under NPF4.
Page 106 of 146

Page 107

• It offers the Council a more robust framework to support the Council’s decisions in
relation to any appeals referencing noise grounds. 
Affordable Housing Supplementary Guidance 
3.2  The measures of success are that the finalised Supplementary Guidance will ensure
that: 
• The consultation responses have been carefully considered and responded to.
• Clearer guidelines for developers/applicants to help ensure that affordable housing
is appropriately considered at an early stage.
• Will help developers/applicants determine development viability and agree the
valuation methodology with the Council at an early stage.
• Aligns with Government Policy on Affordable Housing which is an important
consideration under NPF4.
• It offers the Council a more robust framework to support the Council’s decisions in
relation to any appeals referencing affordable housing policy.
• Can help to increase the efficiency of processing planning applications in terms of
setting the terms for associated legal agreements early that require to be signed
prior to planning consent being issued.     
4. Supporting documentation 
4.1 Finalised draft Supplementary Guidance Note – Planning and Noise 
4.2 Finalised draft Supplementary Guidance Note – Affordable Housing 
4.3 Notice of Intention to Adopt – Supplementary Guidance – Planning and Noise. Scottish
Government correspondence dated 8th September 2023. 
4.4 Notice of Intention to Adopt – Supplementary Guidance – Affordable Housing. Scottish
Government correspondence dated 8th September 2023. 
Pamela Humphries
Chief Officer (Place) 
Page 107 of 146

Page 108

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 108 of 146

Page 109

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 109 of 146

Page 110

North Lanarkshire Council 
Supplementary Guidance 
Planning and Noise
Page 110 of 146

Page 111

2 | P a g e 
Supplementary Guidance – Planning and Noise 
Contents Page
1 Status 3
2 Introduction 3
3 Legislative Framework and Planning Policy 4
4 Development Management in North Lanarkshire 6
5 Noise Guidance and Criteria 8
6 Noise Impact Assessment 14
Appendix 1 – References 16
Appendix 2 – Contact Details for Specialist Acoustic Help 17
Appendix 3 – Glossary of Acoustic Terms 18
Contact Details for North Lanarkshire Council 20
Page 111 of 146

Page 112

3 | P a g e 
1. Status 
1.1.  This Supplementary Guidance (SG) forms part of the Development Plan and is a
statutory requirement in the determination of planning applications.
1.2. The PG expands upon the following North Lanarkshire Council Local Development Plan
policies:
• Policy EDQ 2C – Management Areas
• Policy EDQ 3(part e) – Quality of Development, Guidance 
2. Introduction 
2.1. The main purpose of this guidance is to assist developers, decision makers, agents,
residents and others to identify issues to be addressed in any application for
development in which noise will be an important consideration when assessing that
application.
2.2. Noise is likely to be an important consideration where noise sensitive developments
are planned near to existing noise sources, or where potentially noisy developments
are introduced into existing noise sensitive areas.
2.3. Unwanted sound can have a significant impact upon environmental quality, public
health and amenity. (1) Long term exposure to noise has been linked to increased risk
of cardiovascular disease and stroke. Short term exposure has been linked to
decreased quality of sleep including night awakenings. Disturbed sleep has been
linked to fatigue, accidents and reduced performance (2).
2.4. Good acoustic design is imperative in the development of sites in which noise is a
consideration. This process should examine the design options available in relation to
the location of noise sensitive receptors to a noise source including the possibility of:-
• reducing the noise at source
• orientating the proposed buildings to reduce noise impact
• the use of barriers and bunds to reduce the noise level at the noise sensitive receptor
• designing the internal layout to place habitable rooms away from the line of site of any
noise sources and
• use of insulation of the building envelope to mitigate noise.(3)
Page 112 of 146

Page 113

4 | P a g e 
2.5. Early engagement with North Lanarkshire Council’s (NLC) Environmental Health
Service to discuss the proposal and any noise issues on the proposed site is essential.
These discussions should include whether a noise impact assessment report is required
to be undertaken as part of the Planning application process and the terms of the
assessment methodology as well as the internal and external noise level standards
which will be applied by the local authority. Agreeing these matters in advance could
prevent unnecessary delays during the planning process should an alternative noise
impact assessment methodology or standard be applied. Environmental Health may
continue to be involved throughout the process.
2.6. The Scottish Environmental Protection Agency (SEPA) regulates noise from certain
prescribed industrial processes. Notwithstanding the regulatory role of SEPA, the
Council will determine whether any noise impact from an existing or proposed
development is significant in terms of the Planning regime and the local authority will
liaise with SEPA regarding any Planning application involving a proposed new
prescribed process or proposed changes to an existing prescribed process. 
3. Legislative Framework and Planning Policy 
3.1. Scottish Government Policy
3.1.1 The Environmental Noise (Scotland) Regulations, 2006 requires the
production of strategic noise maps for large urban area, transport corridors
and large airports within Scotland. From these strategic maps, action plans
were drawn up which identified areas where residents were likely to be
exposed to the highest levels of noise. These areas are known as Noise
Management Areas [NMAs]. These action plans also identified areas
where individuals were likely to experience relatively low levels of noise and
these are known as Quiet Areas [QAs]. The Scottish Government Action
Plans aim to identify noise abatement measures designed to manage,
avoid, prevent or reduce the harmful effects of noise exposure in NMA’s.
These Action Plans also aim to maintain and protect environmental noise
quality in QAs. Similarly, through the planning process Local Authorities
are required to ensure that new development does not result in increasing
numbers of people exposed to adverse noise impacts in both NMAs and
QAs. At the time of publishing this guidance no noise management areas
Page 113 of 146

Page 114

5 | P a g e 
or quiet areas have been declared in North Lanarkshire.
3.1.2 Planning Advice Note (PAN) 1/2011(1) provides guidance for planning
authorities in relation to planning and noise and when noise impact
assessment (NIA) will be required. The contents of this document have
been considered in the development of this guidance together with
appropriate European and national guidance on noise.
3.1.3 The Technical Guidance Note (4) which accompanies PAN 1 offers
guidance regarding technical aspects of noise assessment and mitigation
but recognises that it is up to each individual local authority to develop their
own noise guidance and set appropriate noise standards specific to their
local circumstances.
3.14 National Planning Framework 4 (NPF4) specifically Policy 23 Health and
safety requires noise impact to be taken account of in determining planning
applications. Other policies refer to noise considerations as well.
3.2. North Lanarkshire Council Policy and Guidance
3.2.1. Local Development Plan. The Town and Country Planning (Scotland) Act
1997 (as amended by the Planning etc (Scotland) Acts 2006 and 2019) and
its associated regulations requires local authorities to produce a local
development plan, setting out the Council’s detailed policies and proposals
for the use, development, protection and improvement of land. North
Lanarkshire Council adopted its Local Development Plan on 6th July
2022(4). Section 22 of The Town and Country Planning Act 1997 allows
local authorities to adopt and issue guidance attached to a local
development plan. Section 22 is continued in effect to enable the adoption
of certain supplementary guidance until 31 March 2025 by regulation 4 of
the Planning (Scotland) Act 2019 (Commencement No. 11 and Saving and
Transitional Provisions) Regulations 2023.”
3.2.2. The Business Plan for North Lanarkshire sets the direction for the council
and its partners. Its purpose is to communicate the shared priorities and
provide a focus for activities and resources. The plan details North
Lanarkshire Council’s big ambitions in terms of realising large-scale
regeneration and infrastructure projects. As part of these regeneration and
infrastructure projects the noise impact of any development will be one of
the many considerations. Page 114 of 146

Page 115

6 | P a g e 
3.2.3. The Economic Regeneration Delivery Plan for North Lanarkshire sets
out a high-level framework for improving economic opportunities and
outcomes for all by delivering an integrated approach to investing in four
key, inter-related areas: Housing supply; Town centres; Business and
industry; Infrastructure. As part of this integrated approach the impact of
noise on sensitive developments will require to be considered. Good
acoustic design can provide a solution to potential noise impact issues
when noise sensitive receptors and noise generating sources require to
coexist in the same location. 
4. Development Management in North Lanarkshire
4.1. Noise will be a material consideration in any planning application when:
• Noise sensitive development (NSD) is proposed close to an existing
noise source.
• Noise generating development (NGD) is planned next to an existing
noise sensitive development.
4.2. Noise sensitive uses may include a residential area, school or hospital while noise
generating uses are likely to be cultural venues, live music venues, noisy roads, railways,
industrial and commercial sites.
4.3. Where it is not possible to separate noisy and noise sensitive land uses, developers
will have to incorporate good acoustic design and a sensitive approach to any new
development proposals. This approach will be key in Town Centre locations where
North Lanarkshire’s ambition is to create vibrant places with mixed use spaces which
maximise social, economic and environmental opportunities. The planning authority
will look favourably on acoustically well designed buildings, in town centre locations,
to enable noise sensitive and noise generating development to succeed in these areas
while maintaining good acoustic conditions for residents.
4.4. In a very small minority of areas which already have an unacceptably high noise level
it may not be possible to mitigate the adverse effects of noise. In such circumstances
noise sensitive development may not be appropriate.
4.5. The Environmental Protection Act, 1990, places a duty on Local Authorities to
investigate noise complaints from, among others, industrial and commercial sources.
Where statutory nuisance conditions exist, a Local Authority must serve Notice
requiring the business to take action to reduce noise levels. This requirement may
Page 115 of 146

Page 116

7 | P a g e 
result in a company having to reduce their operations or in extreme cases close their
business. Therefore, in considering a NSD close to industrial/commercial sources
there is an obligation on the planning authority to protect existing commerce and
industry from complaints from residents of new housing development.
4.6. Developers should agree representative noise standards and the site-specific NIA
methodology with the planning authority in advance of undertaking the assessment.
4.7. It is recognised by the World Health Organisation (WHO) that a large proportion of the
public wish to sleep with their window open, slightly, for ventilation (6). For this reason,
it is required that developers seek to use good building design to allow the windows
of habitable rooms (bedrooms, living rooms and dining rooms) to be open slightly for
ventilation while providing satisfactory internal noise levels.
4.8. Pan 1/2011 and BS 8233:2014 both recognise, in some areas where development is
desirable, while it is preferable to have open windows in habitable rooms of a new
noise sensitive development, this might not always be possible where external noise
levels are high, and still achieve satisfactory internal noise levels(1)(3).
4.9. In North Lanarkshire developers will be expected to aim to achieve satisfactory
internal noise levels with room window open slightly for ventilation. The developer
must demonstrate that they have explored all potential mitigation options to try and
achieve this goal on sites where noise levels are an issue. At the very least this should
include exploring the potential for:
a) orientating the proposed buildings to reduce noise impact.
b) the use of barriers and bunds to reduce the noise level at the noise sensitive
receptor.
c) designing the internal layout to place habitable rooms away from the line
of site of any noise sources 
d) of insulation of the building envelope to mitigate noise.(3) and
e) reducing the noise at source at the expense of the applicant.
Only after the applicant has provided justification to the satisfaction of the Council that
these mitigation options have been exhausted, it may be possible to consider some
proposals with ‘closed windows’ being part of an overall agreed noise mitigation
strategy. Each site will be considered by the Planning Authority, on its own merits. The
number of affected properties and the level to which the guideline is exceeded will be
considered by the planning authority when determining the suitability of a
Page 116 of 146

Page 117

8 | P a g e 
development where ‘closed windows/alternative ventilation’ is a limited part of an
overall agreed noise mitigation strategy. This approach is highly likely to be more
acceptable to NLC for anonymous transport noise sources without distinctive noise
characteristics than for industrial/commercial noise sources for reasons which are
outlined below.
4.10. The internal noise standards quoted within the various WHO documents and within BS
8233:2014 relate only to anonymous noise sources such as road and rail traffic. WHO
research finds that residents consider these types of noise to be less annoying than
noise from discrete known sources which often generate a stronger emotional
response(6). WHO 1999, indicates that a window, open for ventilation, will provide
attenuation of between 10 – 15 dB(6). WHO Environmental Noise Guidelines for the
European Region, 2018 provides guidance regarding attenuation which may be
provided by windows within structures “The differences between indoor and outdoor
levels are usually estimated at around 10 dB for open, 15 dB for tilted or half-open and
about 25 dB for closed windows”(7). This is based on research on attenuation of road
traffic noise and consequently NLC will apply a 15dB attenuation for window open for
ventilation when transport noise sources are being assessed.
4.11. Noise from industrial and commercial sources is not anonymous in nature and is often
more variable in level and character. It often contains discrete tones, impulsive and
intermittent noise. As such it is considered to cause greater annoyance and
disturbance to receptors. Due to the nature and character of industrial/commercial
noise, which can include externally sited fan or plant noise, when assessing indoor
noise levels within a noise impact assessment, an open window should be considered
to give the lower end of the spectrum of attenuation at 10 dB. 
5. Noise Guidance and Criteria
5.1. A quantitative assessment of noise levels impacting a site will be required as part of
an application where noise is a material consideration. A qualitative assessment may
also be required.
5.2. Anonymous Road and Rail Traffic Noise
5.2.1. The WHO Guidelines for community noise 1999(6), Night noise for Europe
2009(2) and Environmental Noise Guidelines for Europe, 2018(7) provide
information about appropriate external and internal noise levels in relation
Page 117 of 146

Page 118

9 | P a g e 
to anonymous noise from road and rail traffic. These noise levels have then
been transposed into UK guidance in the form of BS 8233:2014(3)
5.2.2. The indoor ambient noise levels for new dwellings planned next to an
existing road or rail noise source are given in BS 8233:2014 Table 4 which
is reproduced below together with the accompanying notes:- 
Table 4 Indoor ambient noise levels for dwellings 
Activity  Location 07:00 to 23:00 23:00 to 07:00
Resting
Dining
Sleeping (daytime resting)
Living room
Dining room/area
Bedroom
35 dB LAeq, 16hour
40 dB LAeq, 16hour
35 dB LAeq, 16hour
-
-
30 dB LAeq, 8hour 
NOTE 1 Table 4 provides recommended levels for overall noise in the design of a building. These are the sum
total of structure-borne and airborne noise sources. Groundborne noise is assessed separately and is not included
as part of these targets, as human response to groundborne noise varies with many factors such as level,
character, timing, occupant expectation and sensitivity. 
NOTE 2 The levels shown in Table 4 are based on the existing guidelines issued by the 
WHO and assume normal diurnal fluctuations in external noise. In cases where local conditions do not follow a
typical diurnal pattern, for example on a road serving a port with high levels of traffic at certain times of the night,
an appropriate alternative period, e.g. 
1 hour, may be used, but the level should be selected to ensure consistency with the levels recommended in
Table 4. 
NOTE 3 These levels are based on annual average data and do not have to be achieved in all circumstances. For
example, it is normal to exclude occasional events, such as fireworks night or New Year’s Eve. 
NOTE 4 Regular individual noise events (for example, scheduled aircraft or passing trains) can cause sleep
disturbance. A guideline value may be set in terms of SEL or LAmax, F’ depending on the character and number of
events per night. Sporadic noise events could require separate values. 
NOTE 5 If relying on closed windows to meet the guide values, there needs to be an appropriate alternative
ventilation that does not compromise the façade insulation or the resulting noise level. 
If applicable, any room should have an adequate ventilation (e.g. trickle ventilators should 
be open) during assessment. 
NOTE 6 Attention is drawn to the Building Regulations [30, 31, 32]. 
NOTE 7 Where development is considered necessary or desirable, despite external noise levels above WHO
guidelines, the internal target levels may be relaxed by up to 5 dB and reasonable internal conditions still
achieved. 
If there is noise from a mechanical ventilation system, the internal ambient noise levels should be reported
separately with the system operating and with it switched off. If the room contains items such as fridges, freezers,
cookers and water heaters, these should be turned off during measurement. Shorter measurement periods such
as LAeq, 1 hour may be used by agreement, provided the selected shorter measurement period is shown to be
representative of the entire night or day period. 
5.2.3. To prevent sleep disturbance at night, as well as considering the equivalent
sound pressure level (LAeq) of the sound source, the maximum indoor sound
pressure level (LA,fast,max) and the number of those maximum sound events Page 118 of 146

Page 119

10 | P a g e 
should be assessed. WHO, 1999 suggests an LA,fast,max of 45 dB should not
be exceeded for any single event more than 10-15 times per night, to
prevent sleep disturbance(1). While WHO, 2009 suggests an LA,fast,max of 42
dB has been found to show no detectable adverse alteration in the sleeping
individual(2).
5.2.4. It is desirable that external noise levels in gardens, patios and amenity space
of residential properties do not exceed 50 dB LAeq,T, with an upper
guideline value of 55 dB LAeq,T, where T is the daytime period of 16 hours,
07:00 to 23:00, development that cannot meet these guidelines should be
avoided. Where proposed development cannot meet these criteria with the
provision of the most effective noise mitigation measures in place, the
following factors will be considered by the planning authority when
determining the suitability of the development:
• The number of affected properties;
• The level by which the guidelines are exceeded;
• The impact on the amenity and wellbeing of the occupiers, in the
context of all the proposed mitigation measures for the property. 
5.2.5. Relevant Target Noise levels for Road, Rail and Aircraft Traffic 
Sound
Source
Relevant Standard for
Assessment
Target Levels Standard from which
target
levels are derived
Road Traffic Calculation of Road
Traffic Noise 1998
[CTRN]; Design
Manual for Roads and
Bridges 2012
External Day time:
LAeq[16hours]=50 – 55
dB*; or Lden < 53 dB
External Night time:
LAeq[8hours]=
45dB** ; or Lnight <
45 dB 
Internally Night time:
LAmax= 45 dB ***
WHO Guidance for
Community Noise 1999, WHO
Night Noise Guidelines for
Europe, 2009, BS 8233:2014;
WHO Environmental Noise
Guidelines for Europe, 2018
Rail Traffic Calculation of Railway
Noise 1995[CRN]
External Day time:
LAeq[16hours]=50 – 55
dB*; or Lden < 54 dB
External Night time:
LAeq[8hours]= 45dB** ;
or
Lnight < 44 dB
Internally Night time:
LAmax= 45 dB ***
WHO Guidance for
Community Noise 1999, WHO
Night Noise Guidelines for
Europe, 2009, BS 8233:2014;
WHO Environmental Noise
Guidelines for Europe, 2018
Air Traffic Guidance in
BS 8233:2014;
Civil
Aviation Authority
Lden < 55 dB
Lnight < 40 dB
WHO Environmental Noise
Guidelines for Europe, 2018 
*BS8233:2014 recognises that it may not always be possible to meet 55 dB in residential Page 119 of 146

Page 120

11 | P a g e 
gardens, but that good design should be used to reduce noise levels in external amenity areas
to the lowest possible level.
**when assessed externally 1 m from the facade
*** No more than 10 – 15 times per night. When considering the number of times per night
each situation will be assessed on site by site basis and will be determined by the number of
events and the levels of each event. 
5.2.6 Any increase in traffic caused by a proposed development and assessment of its  
effect on noise levels at exiting residential properties should be included with in the
NIA.
5.3 Industrial and Commercial Noise Sources
5.3.1 Noise from industrial and commercial sources is often varying in nature can be
complex to assess. The most relevant standard for assessing new industrial
and commercial development is BS 4142:2014+A1:2019. Methods for rating
and assessing industrial and commercial sound (8).
5.3.2 BS 4142:2014 provides a methodology of assessment and rating of commercial
and industrial sound externally and gives an indication of whether that sound
is likely to have an adverse effect on the residents of nearby dwellings both
externally and internally. The standard is used to determine the impact of noise
from a new industrial/commercial noise source on existing residential properties
or from an existing industrial/ commercial noise source on a new residential
development. This is achieved by determining: -
a) The ambient, residual and background noise levels
b) The rating level of the sound source, which may include
penalties for the tonal, impulsive, intermittent or otherwise
distinctive character of the sound
c) The context in which the sound is occurring
d) The significance of impact of the sound source by
determining the level by which the rating level exceeds the
background noise level
e) An exceedance of +10 dB or more is considered to be an
indication of likely significant adverse impact dependant on
the context of the noise
f) An exceedance of +5 dB or more is considered to be an
indication of likely adverse impact dependant on the context
of the noise
g) The lower the rating level is relative to the measured
background level the less likely it is that the specific noise
source will have an adverse impact or a significant adverse
impact. Page 120 of 146

Page 121

12 | P a g e 
5.3.3 Relevant Noise Standards for Industrial/Commercial Noise
BS 4142 Outcome Planning Advice 
LAr(T) – LA90,T is > 0  Noise is unlikely to be a consideration 
LAr(T) – LA90,T is > 0 and < +5
Where the rating level is above the background noise level by up
to 5 dB it is in an indication that the noise may not be
acceptable from a noise perspective depending on the context.
Further noise mitigation is likely be required to reduce LAr(T) –
LA90,T to as close to 0 as reasonably practicable. 
LAr(T) – LA90,T > + 5
Where the rating level is 5 dB or more above the background
noise level this is an indication that the development is unlikely to
be acceptable from a noise perspective. Further mitigation will
be necessary to reduce the LAr(T) – LA90,T to as close to 0 as
reasonably practicable. 
5.4 Entertainment Noise
5.4.1 New commercial developments where amplified music or any broadcasting is
a likely activity should be designed to ensure that this noise is contained within
the development boundary and is inaudible within any neighbouring noise
sensitive property.
5.4.2 New residential developments planned near venues where amplified music or
broadcasting is likely, should be designed to ensure that noise from these
sources is inaudible within the proposed noise sensitive properties and where
appropriate in their gardens or amenity space.
5.5 Noise from Externally Sited Plant and Ventilation Systems
5.5.1 Noise from new or altered ventilation systems must be designed so that it meets
the appropriate Noise Rating (NR) Curve in the nearest residential property.
Where new NSD is located next to existing ventilation system noise the
development should be designed to allow the noise standards detailed in 5.5.3
to be met.
5.5.2 Noise Level Standards for Ventilation Noise
Noise Rating (NR)
Curve
Time of day
NR 30 07:00-23:00
NR 25 23:00 – 07:00
NR20 (quieter areas) 23:00 – 07:00
Page 121 of 146

Page 122

13 | P a g e 
5.5.3 For externally sited plant or ventilation systems which are located adjacent to:
a) amenity areas where the background noise level is relatively low or
b) high background noise levels where noise above NR 30 may be
acceptable
an assessment in terms of BS 4142:2014+A1:2019 may be more appropriate.
Where either of these situations arise agreement should be sought from
Environmental Health on the appropriate methodology prior to assessment. 
5.6 Development where for traffic, industrial- commercial, entertainment and ventilation
noise is material consideration will only be permitted where the planning authority is
satisfied that the criteria outlined in 5.2 – 5.5 above have been achieved and that a
development does not give rise to significant adverse impacts on health and quality of
life and/or does not require businesses to have unreasonable restrictions put on them
because of changes to nearby land uses. 
5.7 Wind Turbine Noise
5.7.1 Wind turbine development applications are not considered in this guidance.
Advice on this topic can be found on our website at
https://www.northlanarkshire.gov.uk/pests-and-
pollution/pollution/noise/noise-guidance-wind-turbine-developments 
5.8 Construction and Demolition Noise
5.8.1 In general control of noise from construction and demolition works in NLC is by
means of guidelines on restricting the hours of operation of noisy equipment.
These guideline times are:
• Mondays to Fridays - 8am to 7pm
• Saturdays - 8am to 1pm
• Sundays and Bank Holidays - no noise should be audible at the site
boundary.
5.8.2 The Control of Pollution Act, 1974 (9) (CoPA) Sections 60 and 61 may be used
by the council to control noise from construction and demolition works.
5.8.3 Section 61 of the CoPA allows the person(s) carrying out the works to apply to
the Council for permission to undertake these works at specified dates and
Page 122 of 146

Page 123

14 | P a g e 
times, in a specific manner, using specified equipment/methods. The Council
has 28 days to decide upon any application they receive. 
5.8.4 Section 60 of the CoPA allows the Council to place restrictions on any
construction/demolition works where it has had or believes it is likely to have
complaints regarding noise. Any aspect of the site works can be restricted for
example hours of operation, equipment used, work methods etc.
5.8.5 BS5228-1:2009 +A1:2014 Code of practice for noise and vibration control on
construction and open sites provides guidance for those undertaking this work.
This document discusses noise mitigation controls, best practice in relation to
communication with local residents, etc.(10)
6 Noise Impact Assessment
6.1 Noise impact assessment should be carried out by a suitably qualified and competent
noise consultant. The consultant would be expected to hold membership of the
Institute of Acoustics or the Association of Noise Consultants.
6.2 As a minimum a noise impact assessment report should include: - 
a) An Introduction
Statement of qualifications, competency, professional memberships,
experience, professional indemnity, etc.
b) A description of site and proposal including the relevant noise source and
associated detail
c) Identification of the receptor, their proximity to source and their sensitivity
d) The acceptable noise criteria agreed with the authority in advance
e) Details of noise measurement survey undertaken should as a minimum
include (but not limited to) details of the: -
• device(s) used, assessment methodology, location, duration,
meteorological conditions
• interpretation of results, data summary, and any additional
calculations
• Any assumptions made
• Impact assessment – analysis of results against acceptability
criteria
• Noise mitigation measures – discussion of any need for, the
options available to mitigate
Page 123 of 146

Page 124

15 | P a g e 
• observed noise levels, and the improvement various options
might provide.
f) Conclusions
g) Recommendations
h) Appendices, for raw measurement data, calibration certificates,
calculations, if modelling used input parameters, additional maps and plans,
details and specifications for mitigation measures. 
6.3 Where there is significant night time noise in the area under consideration an attended
night time noise survey is likely to be required. 
6.4 Where noise mitigation measures are conditioned as part of the planning consent, the
applicant may be required to validate that the measures detailed in the planning
condition have been installed to the satisfaction of a suitably qualified acoustic
consultant. It is likely that a report detailing these validation works will require to be
submitted to, and approved by, the Planning Authority i.e. NLC before any such
condition can be discharged.
Page 124 of 146

Page 125

16 | P a g e 
Appendix 1 
References
1. Planning Advice Note (PAN) 1/2011, Scottish Government 2011
2. World Health Organisation, Night noise guidelines for Europe 2009
3. BS 8233: 2014 Guidance on sound insulation and noise reduction for buildings
4. Assessment of noise: technical advice note, Scottish Government 2011
5. North Lanarkshire Local Development Plan, 2021
6. World Health Organisation, Guidelines for Community Noise 1999
7. World Health Organisation Environmental Noise Guidelines for the European Region 2018
8. BS 4142:2014+A1:2019. Methods for rating and assessing industrial and commercial
sound
9. The Control of Pollution Act, 1974
10. BS5228-1:2009 +A1:2014 Code of practice for noise and vibration control on construction
and open sites
Page 125 of 146

Page 126

17 | P a g e 
Appendix 2 
Contact details for acoustics organisations
1 Institute of Acoustics Sidbury Court
406 Sidbury Boulevard
Milton Keynes
MK9 2AF
T: 0300 999 9675
E: ioa@ioa.org.uk
IOA web site link to assist in finding a suitable noise consultant
https://www.ioa.org.uk/find-acoustics-specialist-or-supplier 
2 The Association of Noise Consultants
19 Omega Business Village
Thurston Road
Northallerton
DL6 2NJ
T: 020 8253 4518
E: info@theanc.co.uk
ANC web site link to assist in finding a suitable noise consultant
https://www.association-of-noise-consultants.co.uk/ 
3 Building Research Establishment Red
Tree Magenta
Red Tree Business Centre
270 Glasgow Road, Rutherglen
Glasgow, G73 1UZ
T: +44 (0)1414 474999
E: enquiries@bregroup.com
Page 126 of 146

Page 127

18 | P a g e 
Appendix 3 Glossary of Acoustic Terms 
‘A’ weighting (dB(A)): A frequency dependent correction which weights sound to correlate
with the sensitivity of the human ear to sounds of different frequencies. 
Ambient Noise: A measure of the typical noise (excluding any unusual events) present at a
site. This is usually described in terms of LAeq,T. 
Anonymous noise: Noise that cannot be attributed to a single (specific source). For example,
noise from cars on a road would be considered anonymous whereas a noisy ventilation unit
would not. 
Audible: Sound that can be heard or is perceptible by the human ear. 
Background Noise: A measure of the underlying noise (excluding any unusual events) which
is present at a site before a new noise source is introduced. This is usually described in terms
of the LA90 level: the sound pressure level exceeded for 90% of the time. 
Decibel (dB): A unit used for many acoustic quantities to indicate the level of sound with
respect to a reference level. 
Façade measurement: Noise measurements made outside an external wall of a structure
(usually 1 metre from the wall). 
Good Acoustic Design: focuses on the techniques and principles employed in acoustic
design, as well as room acoustics, hearing, speech, sound insulation, and noise control and
design. Further details can be found in ProPG: Planning & Noise Professional Practice
Guidance on Planning & Noise New Residential Development SD2-i SUPPLEMENTARY
DOCUMENT 2 GOOD ACOUSTIC DESIGN at
https://www.ioa.org.uk/sites/default/files/14720%20ProPG%20Supplementary%202.pdf 
Habitable room: A room used for sleeping or recreation / relaxation. 
Inaudible: Sound that cannot be heard or is imperceptible to the human ear. 
Industrial-type noise sources: Noise sources that are industrial in character. For example,
noise from plant and machinery, materials handling operations, or manoeuvring of heavy
vehicles. 
Institute of Acoustics: A professional body representing persons at all levels working in the
field of acoustics. 
LA90,T: Sound pressure level exceeded for 90% of the measurement period “T” or
‘background level’. 
LAeq,T: Equivalent continuous sound pressure level measured over the time period T
Page 127 of 146

Page 128

19 | P a g e 
LAmax: The maximum RMS A weighted sound pressure level 
Noise: Unwanted sound. 
Noise assessment: Evaluation of noise climate by a suitably qualified person to assist in the
determination of a planning application. 
Noise-sensitive premises /developments: Principally comprising residential premises,
hospitals, schools and hotels. Other premises types may be deemed such depending upon
circumstances. 
Noise Nuisance: A legal term used to describe noise at a level that is disturbing as perceived
by a reasonable person. The meaning of nuisance is defined by precedent in common law. 
Outdoor Amenity Area: An outdoor area adjacent to a residential building which is designed
and intended primarily for the leisure and recreation of the occupants of the dwelling. This will
include gardens, landscaped areas, balconies. 
Rating Level: The noise level of an industrial noise source which includes an adjustment for
the character of the noise. Used in BS4142:2014. 
Suitably qualified person: A person having a suitable combination of formal training and
experience in the assessment of noise.
Page 128 of 146

Page 129

20 | P a g e 
If you require further information or assistance, please contact North Lanarkshire Council using
the details provided below: 
Planning Authority 
Address: Civic Centre
Windmillhill Street
Motherwell
ML1 1AB
Telephone: 01236 632500
Email: planningenquiry@northlan.gov.uk 
Environmental Health 
Address: Ground Floor, Civic Centre
Windmillhill Street
Motherwell
ML1 1AB
Telephone: 01236 856300 or 01236 856361
Email: Environmental-Health@northlan.gov.uk 
Or visit our website at https://www.northlanarkshire.gov.uk/
Page 129 of 146

Page 130

1 | P a g e
North Lanarkshire Local Development
Plan 
Affordable Housing
Supplementary Guidance 
September 2023 
Page 130 of 146

Page 131

2 | P a g e
Contents 
Introduction……………………………………………………………………………Page 3
NPF4/National Planning Policy……………………………………………………..Page 3
Legislative Framework……………………………………………………………….Page 3
Council Recognition of Affordable Housing………………………………………..Page 4
Delivery Affordable Housing…………………………………………………………Page 4
Delivery Options………………………………………………………………………Page 6
Valuation Methodology…………………………………………………………….....Page 8
Funding Affordable Housing Delivery……………………………………………….Page 9
Affordable Housing Developer Models……………………………………………...Page 9
Planning Process……………………………………………………………………Page 10
Securing the Development………………………………………………………….Page 10
Review………………………………………………………………………………..Page 11 
Page 131 of 146

Page 132

3 | P a g e
Introduction 
This Supplementary Guidance (SG) advises developers and landowners
how the identified shortfall in the provision of affordable housing in the
Cumbernauld Housing Sub-Market Area (HSMA) will be addressed
when proposals are submitted to the Council for housing developments
of five or more units in the Cumbernauld HSMA. It is supplementary to
Policy CI 1 Affordable Housing contained within the North Lanarkshire
Local Development Plan (NLLDP) and the Affordable Housing Policy
Background Report. This process is intended to secure best value for
the Council and ensure the right type of affordable housing is provided in
the right locations.  Policy CI 1 Affordable Housing may also be applied
on a case-by-case basis, where an identified need has been
demonstrated.   
When developers carry out initial financial appraisals, they should ensure that they
take full account of community expectations and development viability. This will
assist in determining how the affordable housing requirements can be implemented. 
NPF4/National Planning Policy
Since the Adoption of North Lanarkshire Local Development Plan, National Planning
Framework 4 has come into effect. National Planning Policy 16 (e) states
“Development proposals for new homes will be supported where they make
provision for affordable homes to meet an identified need. Proposals for market
homes will only be supported where the contribution to the provision of affordable
homes on a site will be at least 25% of the total number of homes, unless the LDP
sets out locations or circumstances where: i. a higher contribution is justified by
evidence of need, or ii. a lower contribution is justified, for example, by evidence of
impact on viability, where proposals are small in scale, or to incentivise particular
types of homes that are needed to diversify the supply, such as self-build or
wheelchair accessible homes. The contribution is to be provided in accordance with
local policy or guidance.” In the absence of Scottish Government Guidance, the
Council believes that its NLLDP Policy CI 1 Category Affordable Housing and this
SG accords with National Planning Policy 16 (e) and (e) ii in setting out how its fully
justified and tested Affordable Housing Policy will be applied to the consideration of
planning applications for housing in North Lanarkshire. 
Legislative Framework 
The SG takes account of: 
• The Town and Country Planning (Scotland) Act 1997 as amended by 
The Planning (Scotland) Act 2019
• The Housing (Scotland) Act 2001
Page 132 of 146

Page 133

4 | P a g e
• Planning Advice Note 2/2010 (PAN 2/2010)
• North Lanarkshire Local Development Plan (Adopted July 2022)
• National Planning Framework 4 (NPF4) (Adopted February 2023)
• Housing to 2040 
NPF4 Policy 16 requires affordable housing provision where there is an identified
need. The evidence base for an identified need is contained in the Affordable
Housing Background Report and was confirmed by the Local Development Plan
Examination prior to Adoption of NLLDP in 2022. Affordability is a key theme
expressed in the Local Housing Strategy 2021-26. PAN2/2010 Affordable Housing
and Housing Land Audits advises on how the planning system can facilitate the
delivery of affordable housing. NLLDP Policy CI 1 is consistent with the guidance in
SPP and PAN 2/2010. 
Council Recognition of Affordable Housing 
The Council recognises that affordable housing is typically housing available at non-
market prices that meets the needs of those unable to afford to buy or rent on the
open market. 
The Council recognises the following types of affordable housing provision, which
are ranked in priority order, reflecting housing need within North Lanarkshire: 
• Social rented housing (highest priority)
• Mid-market rented or intermediate rented housing
• Shared equity
• Shared ownership
• Discounted low cost for sale/discounted market housing
• Low-cost housing for sale through subsidy
• Other forms of Discounted low-cost housing for sale 
These tenures are aligned with the affordable housing tenures set out in PAN
2/2010. 
Delivering Affordable Housing 
The Council recognises that a range of factors affect the delivery of affordable
housing on individual sites.  These include, but are not limited to: 
• Housing need
• Site suitability
• Costs and availability of public subsidy 
Each proposal will be considered on a site-by-site basis, considering costs of
development and any infrastructure works necessary to facilitate development and
render the site financially viable, as well as any pressure on existing social housing
and proposed social housing newbuild within that particular locality. 
Page 133 of 146

Page 134

5 | P a g e
Identifying the tenure-mix, type and scale of affordable housing will be determined on
a site by- site basis to meet identified need and will be assessed with reference to
the priorities identified in the following: 
• Local Housing Strategy 
• Strategic Housing Investment Plan
• Housing Need & Demand Assessment
• Housing waiting lists and pressure analysis
• Regeneration master plans or other strategic locality planning
• Contribution to the Council’s commitment to create mixed, sustainable
communities 
Factors determining site-suitability for affordable housing are outlined below: 
• Affordable housing is generally, but not exclusively, required by communities
more reliant on public transport, through economic circumstances, health, age
or mobility. It is important these factors don’t disadvantage communities from
accessing education, employment, community or recreation facilities, open
space and health services. Affordable housing should be located close to
amenities in accessible locations where communities can walk, cycle or use
public transport to access services.
• Topography of the site should be considered to ensure accessibility and
mobility for residents, but also the development costs and financial viability of
subsidised affordable housing.
• Consideration should be given to whether or not the desired type of affordable
housing required to meet local needs can be integrated with other house
types being proposed within the development. In the interests of delivering
mixed, sustainable communities affordable housing policy homes are
expected to be indistinguishable in appearance to the market homes
provided.
• Subsidised affordable housing must comply with all relevant legislation and
Scottish Government guidance in terms of design criteria such as Housing for
Varying Needs.
• Scale of development and proximity to other managed units along with
integration must be balanced with the need for efficiency of development and
housing management. 
By taking these factors into consideration at an early stage, the preferred form of
affordable housing contribution can be agreed, and developers or landowners made
aware of this prior to agreeing the valuation methodology jointly with the Council.
This allows developers to consider affordable housing requirements as part of their
site appraisal and land acquisition at an early stage. 
Page 134 of 146

Page 135

6 | P a g e
Delivery Options 
Preference One: On-site Provision
The first preference for affordable housing contributions is provision of on-site,
subsidised affordable housing policy homes or serviced and accessible land1 being
transferred or sold to an appropriate social housing provider.  This should generally
be a Registered Social Landlord (RSL) or North Lanarkshire Council for development
at an end use value for affordable housing. 
Preference Two: Off-site Provision
Provision of off-site affordable homes on another site within the developer’s
ownership or suitable serviced and accessible land being transferred to the Council
or appropriate RSL. It is for the developer to justify the omission of on-site provision
and to guarantee the delivery of off-site provision, within a timescale agreed with the
Council. Again, any land transferred should take account of the end use of the land
for affordable housing. 
Preference Three: Commuted Sum 
Commuted sum as payment in lieu of equivalent of 20% affordable housing onsite
provision. The commuted sum calculation will be determined by the District Valuer
who should be appointed jointly by the Developer and the Council. Any assessment
will take into account the end use value for affordable housing and the difference
between it and the market value. This method will also consider site specific issues.
Any commuted payments received will be spent on provision of affordable housing in
the Cumbernauld Housing Sub-Market Area.  Payment of a commuted sum may also
be acceptable where the Council deem on or off-site provision is unsuitable or where
insufficient funding is available to meet policy requirements. The Council shall utilise
the commuted sum towards the provision of affordable housing within 10 years of
payment. 
The Council will seek to secure on-site provision of affordable housing at the rate of
20% for all new housing developments with an overall site capacity of 25 or more
homes and for sites of 5 to 24 homes the Council will seek payment of a commuted
sum, in lieu of site provision, of a value equivalent to the cost of providing the
percentage of serviced land required by the Affordable Housing Policy. An Affordable
Housing Policy contribution will not be sought on sites of 1 to 4 homes.   
Where a proposal is for fewer than 5 units but is clearly part of a phased
development of a larger site which would be subject to an affordable housing
requirement, a contribution is required at an appropriate stage in the development as
a whole. 
This Supplementary Guidance (SG) advises developers and landowners how the
identified shortfall in the provision of affordable housing in the Cumbernauld Housing
Sub-Market Area (HSMA) will be addressed when proposals are submitted to the 
1 Serviced and accessible land is land that is ready to build on, with the necessary infrastructure in place, which
includes utility connections as well as access to road networks and in locations where communities can walk,
cycle or use public transport to access services.
Page 135 of 146

Page 136

7 | P a g e
Council for housing developments of five or more units in the Cumbernauld HSMA. It
is supplementary to Policy CI 1 Affordable Housing contained within the North
Lanarkshire Local Development Plan (NLLDP) and the Affordable Housing Policy
Background Report. Please note that during the Adoption process, the Reporter
specifically widened the scope of the Policy to be potentially applicable situationally
elsewhere in North Lanarkshire under quite restrictive circumstances and that the
Council was duty bound to accept this. The Reporter’s wording has the effect of
future-proofing the Policy in the event that such, robust, evidence does arise during
the lifetime of the Local Development Plan. This process is intended to secure best
value for the Council and ensure the right type of affordable housing is provided in
the right locations. 
Generally, where the Council or RSL can provide financial commitment that grant
funding would be available to assist in delivery of the affordable housing units, then
this would be the Council’s preferred delivery mechanism. Land transferred should
be serviced, free from constraint, be able to be developed within an agreed
timescale and be valued for delivery of affordable housing. In addition, the project
must be within the Scottish Government’s subsidy target and development cost
benchmarks. 
Planning applications are likely to proceed more efficiently if proposals for the
delivery of affordable housing are set out as part of the initial planning application
and early discussions with the Council and/or nominated RSL would be
recommended. The Council is subject to public sector procurement rules and these
rules may apply to the procurement of any affordable housing element of a
development. 
PAN 2/2010 (Paragraph 21) states that where sites are unsuitable for affordable
housing, developers may offer to provide the contribution on another site within their
ownership, as long as the proposed alternative will help to meet an identified need in
the same Housing Market Area. 
In some instances, provision of the affordable housing on an alternative site within
the Cumbernauld Housing Sub-Market Area may be acceptable to the Council. 
Any alternative site will have to be deemed suitable by the Council (and in particular
will either be allocated for housing within the Local Development Plan or have the
benefit of planning permission for housing), be free from constraint, deliverable
within agreed timescale and within Scottish Government subsidy target and
development cost benchmark. 
The affordable housing delivered off-site will require to be equivalent to the value of
the contribution required on the original site and also must be able to accommodate
the requirement for affordable housing arising from development in its own right.
Commuted sums in lieu of on-site provision will be accepted where: 
• The Council considers on or off-site provision unsuitable
• No funding commitment can be given by the Council or a nominated RSL
• Unsubsidised affordable housing is either financially unviable or will not
meet identified need 
Page 136 of 146

Page 137

8 | P a g e
The Council and developer will be required jointly to appoint the District Valuer, or
other mutually agreed independent valuer, to value the affordable housing
contribution required. The valuation at present will be based in accordance with
guidance in Paragraph 22 of PAN 2/2010, which states that commuted sum
payments should be ‘of a value equivalent to the cost of providing the percentage of
serviced land required by the policy’. Accordingly, the commuted sum required will
be equivalent to the cost of providing 20% of the site’s overall capacity in the form of
serviced land for the provision of affordable housing by the Council or RSL. 
Commuted sums will be used to support the delivery of subsidised affordable
housing within the Cumbernauld Housing Sub-Market Area. All resources from this
source will be used in accordance with priorities identified within the Strategic
Housing Investment Plan and Local Housing Strategy. 
By considering the preferred form of affordable housing contribution developers and
landowners can make informed decisions in relation to agreeing a joint valuation
methodology with the Council. This allows developers to consider affordable housing
requirements as part of their site appraisal and land acquisition at an early stage. 
Valuation Methodology 
An agreed approach to valuations assists both developers and the Council with
forward planning and delivery of the Affordable Housing Policy. 
Early consideration of the site valuation is important to allow developers to assess
the potential impact of Affordable Housing Policy requirements. The Council and the
developer will require to jointly appoint the District Valuer, or other mutually agreed
independent valuer, to carry out an appropriate valuation. 
PAN 2/2010 sets out guidance on valuation of land for affordable housing. At the
point of preparing this SG, VIP 12 and GN Valuation of Land for Affordable Housing
in Scotland have been issued and provide the most up to date guidance in relation to
valuation of land for affordable housing. 
Valuations will be calculated in terms of PAN2/2010 paragraph 25 for on-site
provision and paragraph 26 for commuted sums. Paragraph 25 states that the
commuted sum payments should be ‘of a value equivalent to the cost of providing
the percentage of serviced land required by the policy’. 
Affordable housing land should be transferred at a value determined by the District
Valuer, or other mutually agreed independent valuer suitably experienced in the type
of property and the locality, appointed by mutual agreement between the parties. 
Valuations will be instructed jointly by the developer and Council and be based on
the affordable housing mix required to meet the local identified housing need. 
Page 137 of 146

Page 138

9 | P a g e
Only in exceptional circumstances will the affordable housing requirement be
reduced or waived, and developers will be expected to provide evidence of
associated costs if they seek to negotiate a reduction to the affordable housing policy
requirements. The evidence will be evaluated by the Council and, if necessary, by a
suitably qualified independent third party. 
Funding Affordable Housing Delivery 
The funding for delivering subsidised affordable housing will require the development
to: 
• Meet with Local Housing Strategy priorities
• Meet design and quality standards required by Scottish Government
(including Housing for Varying Needs Standard and Secure By Design)
• Be able to deliver proposed housing within Scottish Government’s regional
development cost benchmarks
• Be part of an existing or agreed development programme 
Where the affordable housing is to be delivered without subsidy: 
• A developer may in some circumstances elect to provide completed
units without subsidy rather than the serviced plots required by the
development plan policy. 
Affordable Housing Developer Models 
The Council will consider shared equity or ‘intermediate’ housing for rent as meeting
identified affordable housing need in North Lanarkshire. 
Where it can be demonstrated by developers that unsubsidised forms of affordable
housing for sale that maintain affordability in perpetuity in some way or another can
be delivered, then these will also be considered. Developers will be expected to put
in place an appropriate priority purchase scheme to target affordable housing at
identified priority groups. 
Priority groups for affordable housing tenures in North Lanarkshire are those in
housing need who cannot afford to buy or rent at market prices.  Housing need
refers to households lacking their own housing or living in housing which is
inadequate or unsuitable for their needs, and who are unlikely to be able to meet
their needs in the housing market without some assistance and who earn less than
the average household income.  The lower quartile weekly household income in
North Lanarkshire is £3302. 
2 Based on the Scottish Government Local Level Household Incomes Estimates (2018).  Estimates are gross
household income received by all adult householders, including welfare benefits, tax credits and housing
benefit and is unequivalised income which does not adjust for size of household where there may be multiple
incomes.
Page 138 of 146

Page 139

10 | P a g e
Planning Process 
It is advisable to ensure that officers of the Council’s Housing Service attend any
pre-application discussions in advance of submitting planning applications. Following
participation in discussions, it is hoped that developers will be able to submit an
Affordable Housing Agreement Letter (produced by the Housing Service) along with
their planning application, this document will demonstrate that the Council’s Head of
Planning and Regeneration Service is satisfied that the provisions of the Affordable
Housing Policy have been met. This document will then form the basis of the Legal
Agreement that will subsequently enable planning permission to be granted in full.
An Affordable Housing Agreement Letter neither grants, nor implies subsequent
granting of planning permission. 
The Affordable Housing Agreement Letter will address matters such as: 
• The mechanism and timescale for the delivery of the affordable housing or
commuted sum agreed between the developer/landowner and the
Council/RSL
• The method of establishing/setting the purchase price for the land
• An agreement to transfer specified areas of land or buildings to an RSL or the
Council
• Detailed conditions relating to appropriate assessment of costs associated
with abnormal ground conditions which will be subject to future site
investigation and warranty
• Detailed conditions relating to provision of an alternative commuted sum
payment if for any reason following more detailed site and development cost
appraisal the specified affordable housing cannot be delivered
• Standard specification and definitions for the scale, type and tenure of
affordable housing to be provided
• An agreement on how any dispute will be resolved regarding valuation and
exceptional site costs 
Securing the Development 
Where a requirement for affordable housing has been established and the value of
same agreed, the affordable housing contribution will be secured by means of
planning condition or a binding legal agreement between the Council and the
developer or landowner seeking the planning consent as follows: 
• Applications for ‘Planning Permission in Principle” (where on-site provision is
proposed) which are granted permission would be subject to a planning
condition which requires the subsequent detailed application (Matters Subject
Page 139 of 146

Page 140

11 | P a g e
to Condition - MSC) to comply with the Affordable Housing Agreement Letter.
The MSC application would then be the basis of a legal agreement as outlined
below.
• Section 75 of the Town and Country Planning (Scotland) Act 1997 as
amended by the Planning etc (Scotland) Act 2006 and Planning (Scotland)
Act 2019 would be used to ensure that on or off- site schemes are
implemented or to allow for the provision of a commuted sum of money on a
phased basis.
• Section 69 Local Government (Scotland) Act 1973 would be used where the
developer has agreed to provide the Council with a commuted sum of money
and where this money would be provided as and when planning permission is
granted. 
Legal agreements will require to be concluded prior to the issuing of planning
consent. The legal agreement will seek to ensure that the terms of the Affordable
Housing Agreement Letter are implemented within a defined timescale. 
The Council considers that affordable housing should remain affordable as long as
there is an identified need shown in the Local Housing Strategy. It is considered that
this can be most effectively achieved through the delivery of social rented housing. 
Where other mechanisms are used for delivery such as shared ownership, shared
equity, discounted low-cost housing or private below rent market housing,
developers will be required to ensure that future sales or rentals of the houses
remain affordable as long as an affordable housing need remains. 
The above is not exhaustive and negotiations on the way in which affordable housing
is provided within a site and the appropriate terms and conditions in the legal
agreement will vary depending on specific site circumstances. 
Review 
The Supplementary Guidance will be kept under review to ensure that it remains
accurate. The Council will therefore keep under review: 
• National legislative and policy developments
• Changes to financial delivery and procurement frameworks
• Changing local circumstances in relation to housing needs 
Monitoring the Local Housing Strategy, Strategic Housing Investment Plan along
with the Housing Land Audit will be key in measuring the effectiveness of the
delivery of the Council’s Affordable Housing Policy.
Page 140 of 146

Page 141

Victoria Quay, Edinburgh  EH6 6QQ
www.gov.scot  
Local Government and Housing Directorate
Planning, Architecture and Regeneration Division 
E: developmentplans@gov.scot 

Gordon Laing
Planning Manager (Strategy & Policy)
Enterprise & Communities
Planning & Place
North Lanarkshire Council 
By email: laingg@northlan.gov.uk
cc: McLennaghanE@northlan.gov.uk 
Our ref:  A44890210
8th September 2023 
Dear Gordon 
NOTICE OF INTENTION TO ADOPT – SUPPLEMENTARY GUIDANCE – PLANNING AND
NOISE 
I refer to your correspondence of 20th July 2023 certifying notice of North Lanarkshire
Council’s intention to adopt the the supplementary guidance titled ‘Planning and Noise’. 
Scottish Ministers give notice that the supplementary guidance ‘Planning and Noise’ may not
be adopted until modifications specified in Annex A to this notice have been made.  The
reasons for the modifications are also set out in Annex A. 
For the avoidance of doubt, prior to adopting this document as supplementary guidance,
your Authority should satisfy itself that it has met the requirements set out in the Town and
Country Planning (Development Planning) (Scotland) Regulations 2008.   
In particular, we would bring to your attention the need to comply with section 27(2) of the
above regulations, which state that supplementary guidance adopted and issued under
section 22(1) of the 19971  Act (in connection with a particular local development plan), may
only deal with the provision of further information or detail in respect of the policies or
proposals set out in the plan and then only provided that those are matters which are
expressly identified in a statement contained in the plan as matters which are to be dealt with
in supplementary guidance. 
Yours sincerely 
Adam Henry
Planning, Architecture & Regeneration Division 
1 Section 22 is continued in effect to enable the adoption of certain supplmentray guidance until 31 March 2025
by regulation 4 of the Planning (Scotland) Act 2019 (Commencement No. 11 and Saving and Transitional
Provisions) Regulations 2023 (SSI 2023/10).
Page 141 of 146

Page 142

Victoria Quay, Edinburgh  EH6 6QQ
www.gov.scot  
ANNEX A 
NORTH LANARKSHIRE COUNCIL – SUPPLEMENTARY GUIDANCE: PLANNING AND
NOISE 
MODIFICATIONS REQUIRED  
For avoidance of doubt, the red text below identifies the new modified text 
1. Modification:
Modify paragraph 1.1 of the supplementary guidance to read: 
“This Supplementary Guidance (SG) forms part of the Development Plan and is a
statutory requirement in the determination of planning applications”
Reason:  To align with the Town and Country Planning (Scotland) Act 1997. 
2. Modification:
Modify paragraph 1.2 of the supplementary guidance to read: 
“The SG expands upon the following North Lanarkshire Council Local Development Plan
policies: 
Status 
• Policy EDQ 2C – Management Areas 
• Policy EDQ 3 (part e) – Quality of Development, Guidance” 
Reason:  To align with North Lanarkshire Local Development Plan (July 2022) 
3. Modification:
Modify paragraph 3.2.1 of the supplementary guidance to read: 
“Local Development Plan. The Town and Country Planning (Scotland) Act 1997 (as
amended by the Planning etc (Scotland) Acts 2006 and 2019) and its associated regulations
requires local authorities to produce a local development plan, setting out the Council’s
detailed policies and proposals for the use, development, protection and improvement of
land. North Lanarkshire Council adopted its Local Development Plan on 6th July 2022.
Section 22 of The Town and Country Planning Act 1997 allows local authorities to adopt and
issue guidance attached to a local development plan. Section 22 is continued in effect to
enable the adoption of certain supplementary guidance until 31 March 2025 by regulation 4
of the Planning (Scotland) Act 2019 (Commencement No. 11 and Saving and Transitional
Provisions) Regulations 2023.” 
Reason:  To align with the Town and Country Planning (Scotland) Act 1997 as amended by
the Planning (Scotland) Act 2019.   
Page 142 of 146

Page 143

Victoria Quay, Edinburgh  EH6 6QQ
www.gov.scot  
4. Modification:
Modify paragraph 4.1 of the supplementary guidance to read: 
“Noise must be a material consideration in any planning application when:” 
Reason: To align with Circular 3/2022 which sets out that possible material considerations
include environmental impacts of the proposed development. 
This applies to the subsequent bullet points covering noise sensitive development and noise
generating development.  
5. Modification:
Modify paragraph 4.2 of the supplementary guidance to read: 
“Noise sensitive uses may include a residential area, school or hospital while noise
generating uses are likely to be cultural venues (including live music venues), noisy roads,
railways, industrial and commercial sites.” 
Reason:  To align with Section 41A – Conditional grant of planning permission: noise-
sensitive developments of the Town and Country Planning (Scotland) Act 1997 as amended
by the Planning (Scotland) Act 2019.   
6. Modification:
Modify part a) and e) of paragraph 4.9 of the supplementary guidance to read: 
“At the very least this should include exploring the potential for: 
a) orientating the proposed buildings to reduce noise impact.
b) the use of barriers and bunds to reduce the noise level at the
noise sensitive receptor.
c) designing the internal layout to place habitable rooms away
from the line of site of any noise sources 
d) use of insulation of the building envelope to mitigate noise.(3)
and
e) reducing the noise at source ” 
Reason:  To align with Section 41A – Conditional grant of planning permission: noise-
sensitive developments of the Town and Country Planning (Scotland) Act 1997 as amended
by the Planning (Scotland) Act 2019.   
Page 143 of 146

Page 144

Victoria Quay, Edinburgh  EH6 6QQ
www.gov.scot  
7. Modification:
Modify paragraph 5.2.4 of the supplementary guidance to read: 
“It is desirable that external noise levels in gardens, patios and amenity space of residential
properties do not exceed 50 dB LAeq,T, with an upper guideline value of 55 dB LAeq,T,
where T is the daytime period of 16 hours, 07:00 to 23:00, development that cannot meet
these guidelines should be avoided. Where proposed development cannot meet these
criteria with the provision of the most effective noise mitigation measures in place, the
number of affected properties and the level to which the guideline is exceeded, the following
factors will be considered, will be considered by the planning authority when determining the
suitability of the development:
 The number of affected properties;
 The level by which the guidelines are exceeded;
 The impact on the amenity and wellbeing of the occupiers, in the context of all the
proposed mitigation measures for the property.” 
Reason:  To align with Policy 23 of NPF4.   
8. Modification
Modify the table at 5.2.5 of the supplementary guidance to read: 
Sound
Source
Relevant Standard for
Assessment
Target Levels Standard from which
target levels are
derived
Road
Traffic
Calculation of Road
Traffic Noise 1998
[CTRN]; Design
Manual for Roads and
Bridges 2012
External Day time:
LAeq[16hours]=50 – 55
dB*; or Lden < 53 dB
External Night time:
LAeq[8hours]= 45dB**
; or Lnight < 45 dB 
Internally Night time:
LAmax= 45 dB ***
WHO Guidance for
Community Noise
1999, WHO Night
Noise Guidelines for
Europe, 2009, BS
8233:2014;
WHO Environmental
Noise Guidelines for
Europe, 2018
Rail
Traffic
Calculation of Railway
Noise 1995[CRN]
External Day time:
LAeq[16hours]=50 – 55
dB*; or Lden < 54 dB
External Night time:
LAeq[8hours]= 45dB** ;
or
Lnight < 44 dB
Internally Night time:
LAmax= 45 dB ***
WHO Guidance for
Community Noise
1999, WHO Night
Noise Guidelines for
Europe, 2009, BS
8233:2014;
WHO Environmental
Noise Guidelines for
Europe, 2018
Air
Traffic
Guidance in BS
8233:2014; Civil
Aviation Authority
Lden < 55 dB
Lnight < 40 dB
WHO Environmental
Noise Guidelines for
Europe, 2018 
Reason:  Text originally not included in error by North Lanarkshire Council. 
Page 144 of 146

Page 145

Victoria Quay, Edinburgh  EH6 6QQ
www.gov.scot  
Local Government and Communities Directorate
Planning and Architecture Division 
E: developmentplans@gov.scot 

Gordon Laing
Planning Manager (Strategy & Policy)
Enterprise & Communities
Planning & Place
North Lanarkshire Council 
By email: laingg@northlan.gov.uk
cc: McLennaghanE@northlan.gov.uk
planningenquiry@northlan.gov.uk 
___ 
Ref: A45117241
8th September 2023 
Dear Gordon 
North Lanarkshire Council – Local Development Plan - Supplementary Guidance -
Affordable Housing - Notice of Intention to Adopt 
I refer to your correspondence of 20th July 2023, regarding North Lanarkshire Council’s
intention to adopt the Affordable Housing Supplementary Guidance. 
Scottish Ministers do not propose to issue a direction in relation to this document. 
Prior to adopting this document as supplementary guidance, your Authority should satisfy
itself that it has met the requirements set out in the Town and Country Planning
(Development Planning) (Scotland) Regulations 2008. In particular, we would bring to your
attention the need to comply with section 27(2) of the above regulations, which state that
supplementary guidance adopted and issued under section 22(1) of the 19971 Act (in
connection with a particular local development plan), may only deal with the provision of
further information or detail in respect of the policies or proposals set out in the plan and then
only provided that those are matters which are expressly identified in a statement contained
in the plan as matters which are to be dealt with in supplementary guidance. 
Yours sincerely 
Adam Henry
Planning, Architecture & Regeneration Division 
1 Section 22 is continued in effect to enable the adoption of certain supplementary guidance until 31 March
2025 by regulation 4 of the Planning (Scotland) Act 2019 (Commencement No. 11 and Saving and Transitional
Provisions) Regulations 2023 (SSI 2023/10).
Page 145 of 146

Page 146

Page 146 of 146