Page 1

29 April 2025 
Members of the 
Planning Committee
Chief Executive’s Office
Rachel Blair
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Planning Committee is to be held in the Council
Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Thursday, 08 May 2025
at 10:00 AM which you are requested to attend. 
The agenda of business is attached. 
Rachel Blair
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Clare Louise McDonald 
Clerk Telephone: 07350 435308
Clerk Email: committee@northlan.gov.uk 
N Shevlin, G Currie, G Brennan, B Burgess, A Bustard, J Cairns, T Carragher, M Coyle, S
Coyle, K Docherty, T Fisher, M Hughes, L Jarvie, T Johnston, J Logue, H Loughran, J
McLaren, C McManus, M McPake, A McVey, L Mitchell, J Reddin, D Robb, A Smith, G
Woods.  
Page 1 of 50

Page 2

Page 2 of 50

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000   
2 Planning Applications Index
Submit Planning Applications Index 
5 - 40 
3 Planning and Enforcement Notice Appeals Lodged
Submit report by Chief Officer (Place) advising of one
Planning and Enforcement Appeal Lodged. 
41 - 44 
4 Rediscovering the Antonine Wall Project Update
Submit report by the Chief Officer (Place) providing an
update on the
unsuccessful funding application to the National Lottery
Heritage Fund (NLHF) to take forward phase 2 of the
project and its implications for the Antonine Wall project
and for West Dunbartonshire Council as lead authority. 
45 - 50 
Page 3 of 50

Page 4

Page 4 of 50

Page 5

North
Lanarkshire
Council 
Planning Applications for consideration     
of Planning Committee 
Committee Date: 8th May 2025 
Ordnance Survey maps reproduced from Ordnance Survey
with permission of HMSO Crown Copyright reserved 
Item 2
Page 5 of 50

Page 6

APPLICATIONS FOR PLANNING COMMITTEE 
8th May 2025 
Page No Application No Applicant Development/Site Recommendation 
7-22 
23-30 
31-39 
24/01192/S42 
25/00051/FUL   
25/00075/FUL                                                         
PAMG Manse Ltd
& Taylor Wimpey
UK Ltd 
Mr & Mrs Crainey 
Mr Mohammad
Akram 
Residential Development 
(Section 42 Application to
Alter Conditions 1, 17, 18,
19 and 21 of Planning
Application 20/00827/FUL
in Relation to Approved
Drawings and Noise
Impact)
Land South Of 
Manse Road
Bargeddie 
Detached Dwelling with
Integral Garage
Land At Woodside Avenue
Kilsyth 
Change of Use from Care
Home Facility to 5 No. Self
Contained Apartments, with
Minimal External
Alterations.
1 Abbeyfield House
Colston Road
Clarkston
Airdrie
ML6 7AA 
Grant (P) 
Grant 
Grant     
(P) 
24/01192/S42 -  If minded to approve planning permission should not be issued until the developer has
completed a revised Section 75 Agreement with the Planning Authority to continue to
secure the appropriate level of financial contribution for education provision.  
Page 6 of 50

Page 7

Application No:  
24/01192/S42
Proposed Development: 
Residential Development (Section 42 application to alter
conditions 1, 17, 18, 19 and 21 of planning application
20/00827/FUL in relation to approved drawings and noise
impact) 
Site Address: 
Land South Of Manse Road
Bargeddie 
Date Registered: 
6th December 2024 
Applicant:
PAMG Manse Ltd & Taylor Wimpey UK Ltd
Lightyear Building
Unit C
Ground Floor
Glasgow Airport Business Park
Marchburn Drive
Abbotsinch
Paisley
PA3 2SJ 
Agent:
Lichfields UK
F.A.O. Kenny Mitchell
115 George Street
Edinburgh
EH2 4JN 
Application Level:
Major Application 
Contrary to Development Plan:
No
Ward:   
10 Coatbridge West 
Kevin Docherty, Lesley Mitchell, Gary Robinson,
Representations:
No letters of representation received.   
Recommendation: 
Approve application 
Reasoned Justification: 
The proposed conditions modified are considered to be acceptable and in accordance with the
relevant policies contained in NPF4 and the North Lanarkshire Local Development Plan 2022
in that changes to the permission can be accommodated without unacceptable detriment to the
character and amenity to that approved previously.
Note to Committee: 
If minded to approve planning permission should not be issued until the developer has
completed a revised Section 75 Agreement with the Planning Authority to continue to secure
the appropriate level of financial contribution for education provision. 
Page 7 of 50

Page 8

Reproduced by
permission of the
Ordnance Survey on
behalf of HMSO. ©
Crown Copyright and
database right 2009.  All
rights reserved.
Ordnance Survey
Licence number
100023396.
Planning Application: 24/01192/S42 
Name (of applicant): PAMG Manse Ltd &
Taylor Wimpey UK Ltd
Site Address: Land South Of
Manse Road
Bargeddie
North Lanarkshire 
Development: Residential Development 
(Section 42 application to alter conditions
1, 17, 18, 19 and 21 of planning
application 20/00827/FUL in relation to
approved drawings and noise impact)   
Page 8 of 50

Page 9

Proposed Conditions:- 
1. That, except as may otherwise be agreed in writing by the Planning Authority, or updated as
required under the terms of any planning conditions, the development shall be implemented in
accordance with drawing numbers: -   
Location & Layout 
AL(0)01 Location Plan
AL(0)03 Existing Site Plan
AL(0)02 Rev J Planning Layout
House types 
STA31-Ambleford (Rev A)-Elevations-PL6_RENDER ELEVATIONS
STA31-Ambleford (Rev B)-Floor Plans
STA31-Ambleford (Rev B)-Section
STA32-Brambleford (Rev A)-Elevations-PL6_RENDER ELEVATIONS
STA32-Brambleford (Rev B)-Floor Plans
STA32-Brambleford (Rev B)-Section
STA34-Keeford (Rev A)-Elevations-PL5_STONE ELEVATIONS
STA34-Keeford (Rev B)-Floor Plans
STA34-Keeford (Rev B)-Section
STA35-Tetford (Rev A)-Elevations-PL5_STONE ELEVATIONS
STA35-Tetford (Rev B)-Floor Plans
STA35-Tetford (Rev B)-Section
STA41-Ayleford (Rev A)-Elevations-PL5_PLANNING ELEVATIONS
STA41-Ayleford (Rev B)-Floor Plans
STA41-Ayleford (Rev B)-Section
STA43-Colford (Rev A)-Elevations-PL4_STONE ELEVATIONS
STA43-Colford (Rev B)-Floor Plans
STA43-Colford (Rev B)-Section
STA46-Rightford (Rev A)-Elevations-PL4_STONE ELEVATIONS
STA46-Rightford (Rev B)-Floor Plans
STA46-Rightford (Rev B)-Section
STG41-Chalham (Rev A)-Elevations-PL4_STONE ELEVATIONS
STG41-Chalham (Rev B)-Floor Plans
STG41-Chalham (Rev B)-Section
STG42-Corkham (Rev A)-Elevations-PL5_STONE ELEVATIONS
STG42-Corkham (Rev B)-Floor Plans
Page 9 of 50

Page 10

STG42-Corkham (Rev B)-Section
STG43-Hubham (Rev A)-Elevations-PL5_STONE ELEVATIONS 
(STANDARD)
STG43-Hubham (Rev A)-Elevations-PL5_STONE ELEVATIONS
STG43-Hubham (Rev B)-Floor Plans
STG43-Hubham (Rev B)-Section
STT31-Aynesdale (Rev A)-Elevations-PL5_STONE ELEVATIONS
STT31-Aynesdale (Rev B)-Floor Plans
STT31-Aynesdale (Rev B)-Section
Landscape 
Landscape Plan Sheet 1
Landscape Plan Sheet 2
Landscape Plan Sheet 3
Soft Landscape Details  
Reason: To clarify the drawings on which this approval of permission is founded. 
2. That PRIOR to any works of any description being commenced on the application site, a
comprehensive site investigation report incorporating mineral stability issues shall be submitted
to and approved in writing by the Planning Authority. The investigation must be carried out in
accordance with current best practice, such as BS 10175: The Investigation of Potentially
Contaminated Sites, or CLR 11. The report must include a site specific risk assessment of all
relevant pollution linkages and a conceptual site model. Depending on the results of the
investigation, a detailed Remediation Strategy may be required as part of the above report. 
Reason: To establish whether or not site decontamination is required in the interests of the
amenity and wellbeing of future users of the site. 
3. Should the intrusive site investigation report, referred to in Condition 2 above, identify the need
for remediation works to be carried out, a detailed Remediation Strategy shall be prepared and
submitted to the planning authority for its written approval. Before any dwellings are occupied, a
certificate (signed by a chartered Environmental Engineer) shall be submitted to the planning
authority confirming that all required remediation works have been carried out in accordance with
the terms of the approved Remediation Strategy. 
Reason: To ensure that the site is free of contamination in the interests of the amenity and
wellbeing of future users of the site. 
4. That before the construction of any roads or houses, unless otherwise agreed in writing with the
Planning Authority; full details of the final surface water drainage scheme shall be submitted to
the said Authority and shall be certified by a chartered civil engineer as complying with the most
recent SEPA SUDS guidance. 
Reason: To ensure that the drainage scheme complies with best SUDS practice to protect
adjacent watercourses and groundwater, in the interests of the amenity and wellbeing of existing
and future residents adjacent to and within the development site. 
5. That the surface water drainage scheme approved under the terms of condition 4 above shall be
implemented contemporaneously with the development in so far as is reasonably practical. 
Within three months of the construction of the SUDS, a certificate (signed by a Chartered Civil
Engineer experienced in drainage works) shall be submitted to the Planning Authority confirming
Page 10 of 50

Page 11

that the SUDS has been constructed in accordance with the relevant CIRIA Manual and the
approved plans. 
Reason: To safeguard adjacent watercourses and groundwater from pollution and in the interests
of the amenity and wellbeing of existing and future residents adjacent to and within the
development site. 
6. That prior to the commencement of development, the applicant shall provide written confirmation
to the Planning Authority that all the requirements of Scottish Water can be fully met to
demonstrate that the development will not have an impact on their assets, and that suitable
infrastructure can be put in place to support the development. 
Reason: To ensure the provision of satisfactory sewerage and surface water drainage
arrangements. 
7. That BEFORE the development hereby permitted starts, a scheme of landscaping shall be
submitted to, and approved in writing by the Planning Authority, and it shall include:- 
(a) details of any earth moulding and hard landscaping, boundary treatment, grass seeding and
turfing;
(b) a scheme of tree and shrub planting, incorporating details of the location, number, variety and
size of trees and shrubs to be planted;
(c) an indication of all existing trees and hedgerows, plus details of those to be retained, and
measures for their protection in the course of development;
(d) a detailed timetable for all landscaping works which shall provide for these works being carried
out contemporaneously with the development of the site. 
Reason: To ensure the implementation and maintenance of the landscaping scheme in the
interest of amenity. 
8. That all works included in the scheme of landscaping and planting, approved under the terms of
condition 7 above, shall be completed in accordance with the approved timetable, and any trees,
shrubs, or areas of grass which die, are removed, damaged, or become diseased, within two
years of the full occupation of the development hereby permitted, shall be replaced within the
following year with others of a similar size and species. 
Reason: To ensure the implementation and maintenance of the landscaping scheme in the
interest of amenity. 
9. That before the occupation of any houses, a management and maintenance scheme shall be
submitted to, and approved in writing by the Planning Authority, and it shall include proposals for
the continuing care, maintenance and protection of:- 
(a)  the proposed SUDS area / compensatory flood water storage area;
(b)  any communal fences and walls;
(c) all other communal areas 
(d) all play areas 
Reason: To ensure the maintenance of communal areas and infrastructure in the interest of
amenity. 
10. That before completion of the development hereby permitted, the management and maintenance
scheme approved under the terms of condition 9 shall be in operation. 
Reason: To ensure there is an adequate landscape maintenance scheme in place. 
11. That BEFORE the development hereby permitted starts, full details of the facing materials to be
used on all external walls and roofs shall be submitted to, and approved in writing by the
Planning Authority and the development shall be implemented in accordance with the details
approved under the terms of this condition. 
Page 11 of 50

Page 12

Reason: In the interests of amenity and design by ensuring that external materials are appropriate
for the site. 
12. That before the last of the dwellings hereby permitted is occupied, all streets, footpaths, footways
and manoeuvring areas shall be completed to final wearing course. 
Reason: To ensure satisfactory vehicular and pedestrian access facilities to the dwellings. 
13.  That before the development hereby permitted starts, a scheme for the provision of the equipped
play area shall be submitted to, and approved in writing by the Planning Authority, including any
modifications as may be required, and this shall include:- 
(a) details of the type and location of play equipment, seating and litter bins to be situated within
the play areas;  
(b) details of the surface treatment of the play area, including the location and type of safety
surface to be installed;  
(c) details of the fences to be erected around the play area, and  
(d) details of the phasing of these works.  
(e) play equipment shall be located at least 15.0m away from the nearest dwelling.  
(f) the play area shall be completed in full within six months of the occupation of the last
dwellinghouse. 
Reason: To ensure that the play scheme is to an acceptable standard and is implemented within
a reasonable timescale. 
14.  That before development starts a further survey shall be submitted in relation to water voles and
an updated Preliminary Ecological Appraisal (PEA) shall be undertaken on the site to determine
the presence of any statutorily protected species, the said surveys shall thereafter be submitted
to and approved in writing by the Planning Authority before any development commences on the
site. All surveys to be undertaken prior the start of any development. As a result of the study,
should any mitigation measures be required for any protected species a Habitat and Species
Management Plan in consultation with NatureScot is submitted for the written approval of the
Planning Authority. Thereafter mitigation shall be implemented in accordance with the Habitat
and Species Management Plan before works commence on the site. 
Reason: To ensure compliance with The Conservation (Natural Habitats & c.) Regulations 1994
(as amended); the Wildlife and Countryside Act (1981) as amended; the Protection of Badgers
Act 1992 (as amended); and the Nature Conservation (Scotland) Act 2004.' 
15. That before the development hereby permitted starts, full details of biodiversity enhancements
to be incorporated into the development shall be submitted in the form of:
a) Inclusion of wildflower areas within the green corridor and under hedgerows that shall
encourage the use of native nectar rich species and food plant for caterpillars in
landscaping. 
b) Inclusion of bird and bat boxes within the development and the fitting of Swift bricks into
buildings to provide potential nesting opportunities for Swift, a priority North Lanarkshire
Biodiversity Action Plan Species.
c) An above ground SUDS pond designed in accordance with RSPB and WWT’s
Sustainable Drainage Systems guide (Graham et al., 2013). 
Reason: To accord with the Nature Conservation (Scotland) Act 2004, where all public bodies
have a duty to further the conservation of biodiversity and to contribute to the aims of North
Lanarkshire Biodiversity Action Plan. 
16.  That before the development hereby permitted is brought into use, all the parking and
manoeuvring areas shown on the approved plans, shall be levelled, properly drained, surfaced
in a material which the Planning Authority has approved in writing before the start of surfacing
work and clearly marked out, and shall, thereafter, be maintained as parking and manoeuvring
areas.
Page 12 of 50

Page 13

Reason: To ensure the provision of satisfactory vehicular and pedestrian access facilities. 
17. To ensure that the ongoing maintenance of acoustic barriers, hereby approved, a maintenance
scheme shall be submitted for written approval prior to development commencing on site. 
Reason:  To ensure that the affected dwellings have suitable noise mitigation measures are
maintained. 
18. The development will be completed in strict accordance with the acoustic mitigation measures
outlined in ‘Environmental Noise Impact Assessment – Bargeddie’ dated 20 September 2024
unless otherwise approved by this Planning Authority. For the avoidance of doubt, this will include
all glazing and ventilation requirements, the installation of acoustic barriers and the completion
of all other acoustic mitigation measures outlined within the approved noise impact assessment.
No dwelling will be occupied until the completion of the appropriate noise mitigation measures
related to that individual dwelling have been implemented and validated by a suitably qualified
acoustician. Any noise mitigation measures required will be installed to the satisfaction of the
Planning Authority. 
Reason:  To ensure that appropriate noise mitigation is in place. 
19.  That BEFORE the development hereby permitted starts, full details of the design and location of
all fences and walls to be erected on the site (including acoustic fencing) shall be submitted to
and approved in writing by the Planning Authority and thereafter implemented, prior to the related
dwellinghouse being occupied 
Reason: To ensure the provision of adequate boundary treatments 
20.  That BEFORE the development starts details shall be submitted for the written approval of the
Planning Authority detailing the means of access to the site for construction traffic throughout the
life of the development and the location of the site compound. The development shall be carried
out in accordance with the approved details. 
Reason: To safeguard residential amenity. 
21. That prior to the commencement of the development details of the lighting within the site shall be
submitted for the approval of the Planning Authority, after consultation with Transport Scotland,
as the Trunk Roads Authority.
Reason: To ensure that there will be no distraction or dazzle to drivers on the trunk road and that
the safety of the traffic on the trunk road will not be diminished
22. That prior to the commencement of the development, details of the landscaping treatment along
the trunk road boundary shall be submitted to, and approved by, the Planning Authority, after
consultation with Transport Scotland.
Reason: To ensure there will be no distraction to drivers on the trunk road, and that the safety of
the traffic on the trunk road is not diminished.
23. That prior to the commencement of the development, details of the barrier proposals along the
trunk road boundary shall be submitted to, and approved by, the Planning Authority, after
consultation with Transport Scotland.
Reason: To minimise the risk of pedestrians and animals gaining uncontrolled access to the trunk
road with the consequential risk of accidents.
24. That for the avoidance of doubt there shall be no drainage connections to the trunk road drainage
system.
Reason: To ensure the efficiency of the existing trunk road drainage network is not affected.
Page 13 of 50

Page 14

25. That notwithstanding the approved location plan all new features along the trunk road boundary,
including landscape screening, fencing and other types of barriers, must be erected on land that
is within the control and / or ownership of the developer.
Reason: To enable maintenance of the proposed boundary features to be carried out, without
encroachment onto land controlled by Transport Scotland.
26. That prior to commencement of works on site the developer shall provide written evidence that
contact has been made with Scottish Gas Networks with regard to ensuring that the integrity of
the servitude or easement area and drainage of their pipeline is not compromised, and that
contact has been made with the local pipeline engineer prior to commencement of works on
site. 
Reason: In the interests of the proper maintenance of the pipeline and public safety. 
Background Papers: 
Consultation Responses: 
NLC Protective Services memorandum received 21st February & e-mail 25th April 2025
Scottish Gas Network letter received 12th December 2024   
Education Memorandum Received 10th March 2025 
Traffic & Transportation memorandum received 9th January & 10th March 2025 
Contact Information: 
Any person wishing to inspect these documents should contact Gordon Arthur at
esplanning@northlan.gov.uk 
Report Date: 
28th April 2025
Page 14 of 50

Page 15

APPLICATION NO. 24/01192/S42 
REPORT 
1. Site Description 
1.1 The site measures approximately 6.7 ha in area, is undeveloped and currently an enclosed field.
The applicant advises that it has not been actively used for many years and was last in use as
an agricultural field. The site is comprised of improved grassland with areas of tall ruderal
vegetation on the northern, eastern, and southern boundaries. The site is located in north-west
Bargeddie, bounded by Manse Road and a railway line to the north; Coatbridge Road and a car
dealership to the south; residential properties to the east and to the west by the M73 on a raised
embankment. Current ground levels at the site generally fall from a high point in the south-west
of the site at 75.1m AOD, to low points in the north-east at 70.0m AOD and to the south-west
boundary of the site at 71.2m AOD. The M73 on the west boundary of the site is situated at
approximately 79.0m AOD. The site is currently only accessible to vehicles or pedestrians from
Manse Road via a farm gate located in the northwest corner where a phone mast is located.
There are no other built structures on the site. 
2. Proposed Development 
2.1 The application has been submitted under Section 42 of the Town and Country Planning
(Scotland) Act 1997 (as Amended) for non-compliance with conditions 1, 17, 18, 19 and 21
attached to Planning Permission ref. 20/00827/FUL. 
2.2 The amendments proposed include. 
•  A change of house types.
•  A reduction in the number of units from 126 units to 117 units  
•  Layout alterations resulting from the changes in house types 
•  Modification of noise mitigation measures resulting from the above changes.
•  Amendments to the drainage layout. 
2.3 The applicant has submitted a schedule of the relevant conditions with proposed changes. The
changed conditions are listed above. Changes proposed substituting A with B are as follows: 
A. Original Condition (ref. 20/00827/FUL) 
Condition 17: That before the development is completed all the noise mitigations require to be
installed as detailed in proposed residential development Environmental noise impact
assessment for proposed residential development at Manse Road, Bargeddie, North
Lanarkshire, consolidated report June 2021. 
Condition 18: A number of plots on the site require to have some or all windows of habitable
rooms closed to provide suitable internal noise levels. Details for each of the plots and the
façade(s) which require acoustic treatment in terms of glazing and ventilation are provided in the
environmental noise impact assessment for proposed residential development at Manse Road,
Bargeddie, North Lanarkshire, consolidated report June 2021. Before any of the plots identified
are occupied these mitigation measures must be installed as per the requirements in the report
and correct installation of the glazing and ventilation units must be validated by a suitable
qualified acoustician. 
Condition 19: That for any property where the mitigation involves Acoustic Barriers these must
be installed as per Proposed residential development Environmental noise impact assessment
Page 15 of 50

Page 16

for proposed residential development at Manse Road, Bargeddie, North Lanarkshire,
consolidated report June 2021. Before any of these plots are occupied the installation and finish
of these acoustic barriers must be validated by suitably qualified acoustician. 
Condition 21: That before any dwellinghouse within the site hereby permitted is occupied, any
noise mitigation measures agreed under the terms of Condition 16 - 19 above shall be installed
to the satisfaction of the Planning Authority. 
B. Variation to Conditions Proposed (ref. 24/01192/S42) 
2.4 The proposed non-compliance with these conditions is in respect of the requirement to comply
with the Noise Impact Assessment Report dated June 2021. A new Noise Impact Assessment
(NIA) has been prepared to reflect the proposed changes in house types and associated housing
layout and the applicant seeks consent to comply with a new NIA in place of the 2021 NIA report
which formed part of the conditions of the previous consent (20/00827/FUL). It is proposed that
Conditions 17-19 and 21 of 20/00827/FUL are merged into the following single acoustic condition
that will relate to the new Noise Impact Assessment dated 20 September 2024:- 
The development will be completed in strict accordance with the acoustic mitigation measures
outlined in ‘Environmental Noise Impact Assessment – Bargeddie’ dated 20 September 2024
unless otherwise approved by this Planning Authority. For the avoidance of doubt, this will include
all glazing and ventilation requirements, the installation of acoustic barriers and the completion
of all other acoustic mitigation measures outlined within the approved noise impact assessment.
No dwelling will be occupied until the completion of the appropriate noise mitigation measures
related to that individual dwelling have been implemented and validated by a suitably qualified
acoustician. Any noise mitigation measures required will be installed to the satisfaction of the
Planning Authority. 
2.5 Should members decide that planning permission should be granted subject to different
conditions from the previous permission, then the Section 42 application should be granted.
Should it be decided that the previous planning conditions should continue to apply without
changes, then the Section 42 application should be refused. The Council has discretion when
granting a Section 42 application to add new conditions or to vary any of the conditions relevant
to the terms of the Section 42 application. This includes changing or adding conditions other than
those which the applicant has applied to vary, provided that members have a reasonable basis
for doing so. Changes in circumstance (e.g. updated technical guidance) since the previous
permission may have arisen. However, new restrictive conditions should not be applied to
existing established approval unless these fairly and reasonably relate to the conditions that the
applicant has applied to vary. If the previous permission was subject to a Section 75 obligation
or other legal agreement, then it will often be necessary to update this to refer to the new
permission. A Section 42 permission will normally be subject to the normal statutory time periods
specified in Section 58 and 59 of the Act, however as with other applications the council has
discretion to vary these timescales by including a direction to that effect in the decision notice. 
3. Applicant’s Supporting Information 
3.1 Supporting information included the following: 
Page 16 of 50

Page 17

• Supporting Statement
• Drainage information
• Noise Impact Assessment
• Planning Statement
• Street Engineering Review 
4. Site History 
4.1 Relevant and recent planning history includes the following: 
• 16/00483/PAN Proposal of Application Notice:  Erection of Residential Development with
Formation of Accesses, Landscaping and Associated Works 
• 20/00827/FUL Residential Development with Formation of Accesses, Landscaping and
Associated Works 
• 22/00417/FUL Upgrade to existing telecom installation (New Tower Headframe)
• 24/01203/ADV Erection of two non-illuminated standalone signs. 
5. Development Plan 
5.1 With regard to the proposal the following policies are relevant in terms of the development plan: 
National Planning Framework 4 (NPF4)
Policy 1 Tackling the Climate and Nature Crises
Policy 2 Climate mitigation and Adaption
Policy 3 Biodiversity
Policy 13 Sustainable Transport
Policy 14 Design, Quality and Place
Policy 15 Local Living and 20 Minute Neighbourhoods
Policy 16 Quality Homes
Policy 21 Play, Recreation and Sport
Policy 22 Flood Risk and Water Management
Policy 23 Health and Safety 
North Lanarkshire Local Development Plan (LDP)
PROM LOC 3 Housing Development Site
PP3 Purpose of Place (General Urban Area) 
CI Contributions to Infrastructure
EDQ 1, 2, 3 Environmental and Design Qualities 
6. Consultations 
6.1 NLC Environmental Health (Pollution Control) has advised the proposed development does
not comply with their noise guidance. They also sought clarification on the exact position of the
proposed 3m acoustic barrier as documents submitted show the barrier ceasing at different points
to that originally approved under the terms of planning consent 20/00827/FUL. Further
information was provided by the applicant which advised that when the proposed development
was compared with the approved Barratt layout from May 2021 (20/00827/FUL) the proposed
development slightly reduces the relative percentage of units that would require acoustic trickle
vents to that originally approved. The relative percentage of units that will require acoustic trickle
vents would now be 97% compared to 99% originally approved. After further consultation with
Environmental Health they advised that they had no objection to the S42 application and
specifically, the removal of part of the acoustic barrier, originally proposed, along the southern
boundary of the site or to the proposed changes to the conditions in order to refer to the most
recent version of the acoustic report. 
Page 17 of 50

Page 18

6.2 NLC Transportation and Infrastructure has no objection to the proposal following the
submission of a revised layout drawing. Comments were provided on the revised layout which
have been carried forward as planning conditions. 
6.3 Scottish Gas Network (SGN) confirm the presence of a High-Pressure Gas Transmission
Pipeline in the vicinity of the proposed development. The building proximity distance for high
pressure gas pipeline E06 is 15 metres and pipeline G02 is 28 metres, in accordance with the
recommendations of The Institution of Gas Engineers document TD/1 Edition 5. SGN
recommended a site meeting with the applicant to identify the location of the pipeline and
discussions should take place with the developer to discuss which measures would be necessary
and could be undertaken in order to safeguard the security of the pipeline. A condition is
recommended to ensure a site meeting takes place with the applicant. The proposed dwellings
are positioned well outwith the building proximity distances and should planning permission be
granted an appropriate condition to control this matter is attached. 
6.4 Education advised on permission 20/00827/FUL that St Kevin’s Primary school is currently
operating over its overall capacity, and it is anticipated that Bargeddie Primary school will be
operating over capacity in future years. They confirmed that this position is unchanged with this
application in that the additional pupil product from this proposed development could not be
absorbed within the existing school provision and will add to the capacity pressures in the local
area. In line with other developments in the local area, it is therefore requested that a developer
contribution of £912,600 which is equivalent to £7,800 per unit is the subject of a legal agreement
on the subject of a commuted sum towards education provision in the local area. The applicant
has confirmed his agreement to this. 
6.5 Health and Safety Executive (HSE) In terms of the high pressure gas pipeline that crosses the
site, HSE do not advise on safety grounds, against the granting of planning permission in this
case. 
7. Representations 
7.1 Following the neighbour notification process including an advert in the local press no
representation was received. 
8. Planning Assessment 
8.1 Section 25 of the Town and Country Planning (Scotland) Act 1997 requires that the application
be determined in accordance with the development plan unless material considerations
indicate otherwise. This application has been made under section 42 of the Town and Country
Planning (Scotland) Act 1997 and seeks permission to modify the conditions relating to the
proposed house types, their layout and the noise mitigation measures associated with the
proposed development. Therefore, whilst it is recognised that the principle of residential
development has been accepted previously it is still necessary to consider if there have been
any changes in planning policy since the previous permission 20/00827/FUL and if the
proposed development would still be able to be accommodated without unacceptable
detriment to the character and amenity to that approved previously. 
8.2 The Development Plan is made up of National Planning Framework 4 (NPF4) and the adopted
North Lanarkshire Local Development Plan (LDP). The North Lanarkshire Local Development
Plan identifies the site as being an allocated housing development site under PROM LOC3.
Therefore, the principle of residential development of the site remains appropriate and likely to
be acceptable in terms of policy PP3 of the LDP, subject to assessment against the
Environmental and Design Qualities policies, EDQ 1, 2, 3 of the LDP and the other relevant
policies of NPF4. With NPF4 prevailing over any LDP policies that are incompatible with its aims
and objectives.
Page 18 of 50

Page 19

NPF4 
8.3 Policy 1 Tackling the Climate and Nature Crises and Policy 2 Climate Mitigation and Adaption
give weight to the global climate and nature crises. The application site is an identified housing
site within the LDP. It is therefore considered to be a sustainable site that can deliver energy
efficient homes and as such can be seen to be compatible with the requirements of Policies 1
and 2 of NPF4. 
8.4 Policy 3 Biodiversity seeks to protect biodiversity, reverse biodiversity loss, deliver positive effects
from development and strengthen nature networks. The proposed development has a wide green
corridor at the mid point of the site along its northern and southern axis. In addition to this green
area, the SUDS area in the north east corner of the site and green edging along the western
boundary to the M73 and along the site’s boundary to Coatbridge Road are considered sufficient
to allow the proposal to meet NPF4’s biodiversity requirements and an appropriate condition has
been attached to control this matter. 
8.5 Policy 13 Sustainable Transport seeks to encourage, promote and facilitate developments that
prioritise walking, wheeling, cycling and public transport for everyday travel and reduce the
need to travel unsustainably. This development is located near established bus routes and is
considered to show sufficient connectivity to meet this policy requirement. 
8.6 Policy 14 Design, Quality and Place seeks to ensure that developments are of a good design,
are not detrimental to the amenity of the surrounding area and are consistent with the 6
qualities of successful places – Healthy, Pleasant, Connected, Distinctive, Sustainable and
Adaptable. It is considered that the proposal is largely consistent with these qualities. However,
it is considered that the impact of noise requires further consideration and this is assessed
below against the Environmental and Design Qualities policies, EDQ 1, 2, 3 of the LDP 
8.7 Policy 15 Local Living and 20 Minute Neighbourhoods sets out that to establish this form of
living consideration will be given to existing settlement pattern, and the level and quality of
interconnectivity of the proposed development with the surrounding area. The proposed
development relates to an allocated housing site within the LDP and is therefore considered to
be in a sustainable location. It is positioned adjacent to established housing areas with nearby
bus routes and is therefore considered to comply with this policy. 
8.8 Policy 16 Quality Homes supports new homes on land allocated for housing in Local
Development Plans and sets out various requirements including and not limited to meeting
local housing requirements, providing or enhancing local infrastructure, facilities or services and
improving the residential amenity of the surrounding area. As such the principle of housing is
acceptable, so long as the detailed considerations of the development are acceptable.
However, it is considered that the impact of noise requires further consideration and this is
assessed below against the Environmental and Design Qualities policies, EDQ 1, 2, 3 of the
LDP
8.9 Policy 21 Play, Recreation and Sport looks to encourage, promote and facilitate spaces and
opportunities for play, recreation and sport. The proposed development provides a considerable
area of open space within the centre of the site for recreational use and a designated play area.
It is therefore considered to be acceptable in terms of the requirements of this policy.
8.10 Policy 22 Flood Risk and Water Management seeks to strengthen resilience to flood risk by
promoting avoidance as a first principle and reducing the vulnerability of existing and future
development to flooding. Mapping generated by SEPA indicates that that some parts of the
northern and southern edge and north east corner of the site may be affected by surface water.
In terms of developments such as this any approval would require a Sustainable Urban Drainage
system to be conditioned. These systems require to be designed in line with current best practice
and ultimately needs to be signed off by a suitably qualified person. Therefore, it is considered
that this matter can be controlled by condition and the proposed development would be able to
comply with this policy. An appropriate condition has been attached to control this matter, should
planning permission be granted.
Page 19 of 50

Page 20

8.11 Policy 23 Health and Safety seeks to protect people and places from environmental harm,
mitigate risks arising from safety hazards and encourage, promote and facilitate development
that improves health and well being. Criteria (e) notes that development proposals that are
likely to raise unacceptable noise issues will not be supported and that a Noise Impact
Assessment may be required where the nature of the proposal or its location raise the potential
need for noise to be considered. A Noise Impact Assessment has been submitted for the site
and this matter is considered below against the Environmental and Design Qualities policies,
EDQ 1, 2, 3 of the LDP. 
North Lanarkshire Local Development Plan (LDP) 
8.12 PROM LOC 3 Housing Development Site and PP3 Purpose of Place. As an allocated housing
site the council requires development to maintain and improve the level of amenity appropriate
for the local context. As detailed above it is considered that the proposed development can
adhere to these policy requirements subject to assessment against Environmental and Design
Qualities policies, EDQ 1, 2, 3 of the LDP. These are considered below.   
8.13 CI Contributions to Infrastructure seeks to secure developer contributions for new developments
that, individually or cumulatively, generate a requirement for new or enhanced infrastructure or
services. A S75 agreement is in place for the previous approval (20/00827/FUL) requiring a
developer’s contributions towards education provision. Education requested £7,800 per unit and
this obligation still requires to be met should planning consent be granted for this application. No
consent would therefore be issued until the developer had completed a revised Section 75
Agreement with the Planning Authority to continue to secure the appropriate level of financial
contribution for education provision. 
8.14 EDQ 1 (Site Appraisal), EDQ 2 (Specific Features for Consideration) and EDQ 3 (Quality of
Development) consider a range of potential impact criteria such as design, materials, and road
safety, including if the development is in an area subject to hazards such as in this case a high
pressure gas pipeline. The overall provision is that proposals must integrate successfully with the
surrounding area maintaining acceptable levels of amenity, whilst meeting the challenges of
climate change and sustainability. 
8.15 Development will only be permitted where high standards of site planning and sustainable design
are achieved. Aspects such as siting; overall layout; density; form; scale; height; massing;
proportion; detailing; colour; materials for the proposed development need to be considered. The
proposed house types for the site have been replaced and the flats that were originally proposed
within the scheme have been removed which has reduced the overall number of units within the
site from 126 to 117. The applicant now proposes a mix of two, three and four bedroom houses
comprising detached, semi-detached and terraced properties. It is considered that the scale,
density, design and overall layout; of the proposed development would be acceptable and would
integrate successfully into the local and wider area. The supporting information demonstrates
that the development will not result in a significant impact in terms of daylight and shadowing and
the choice of materials can be controlled by condition.
8.16 In terms of road safety following consultation with NLC Transportation and Infrastructure a
satisfactory revised layout was submitted for review and found to be acceptable.
8.17 In terms of air quality and pollution no concerns were raised by Environmental Health. In terms
of noise however, the applicant acknowledges that the removal of a block of flatted dwellings
within the original approved layout and their replacement with dwellinghouses will alter the
acoustic profile of the development considered within the Environmental Noise Impact
Assessment for proposed residential development at Manse Road, Bargeddie, North
Lanarkshire, consolidated report June 2021. Mindful of this the applicant submitted a report for
consultation ‘Environmental Noise Impact Assessment – Bargeddie’ dated 20 September 2024.
This assessment outlines the acoustic profile of the new site layout supplementing the original
Page 20 of 50

Page 21

Noise Impact Assessment that accompanied the original planning permission. This assessment
outlines the acoustic levels within the dwellings and within their private amenity spaces and
mitigation required. The proposed planning condition relating to the acoustics of the site (noted
above) is therefore worded in a way to require that the relevant mitigation is installed prior to the
occupation of each dwelling. As such, the proposed dwellings will continue to achieve a level of
acoustic performance to that previously approved. In terms of the S42 proposed amendments, a
comparison between the two proposals was carried out and it was considered that there was little
difference between the S42 proposal and that previously approved, in that the site was 99%
windows closed before and now 97% windows closed. To that end, NLC Environmental Health
have no objection to the S42 application and specifically, the removal of part of the acoustic
barrier, originally proposed, along the southern boundary of the site and changes to the
conditions to refer to the most recent version of the acoustic report. Should planning permission
be granted, an appropriate condition has been imposed to control this matter. 
8.18 In terms of flooding and drainage developments an initial Drainage Assessment has been
undertaken in accordance with the standing advice and requirements of the Scottish Environment
Protection Agency (SEPA), National Planning Framework 4, North Lanarkshire Council’s
planning guidance and Sewer for Scotland 4th Edition. On this basis it is considered that the
development does not present flooding concerns and conditions can be imposed to confirm the
drainage proposals are installed in accordance with the plans and SUDS principles and that
Scottish Water’s requirements for connection are met.
8.19 In terms of the high pressure gas pipeline that crosses the site, HSE do not advise on safety
grounds, against the granting of planning permission in this case. 
8.20 Adequate provision can made for the development and maintenance of landscaped areas,
biodiversity and for linking to and enhancing open spaces and green networks. If planning
permission is granted appropriate conditions can be imposed to control this matter.
8.21 In concluding this policy assessment It is considered that the proposed amended layout has
considered and been designed in terms of siting, massing and finishing materials to an
acceptable standard, as such, it is considered that the proposal complies with policies EDQ 1, 2
and 3. It is also considered that the proposal by virtue of its design and location is acceptable in
terms of amenity. 
Other- Material considerations 
8.22 In referring to Circular 4/1998, the use of Planning Conditions in Planning Permission,
conditions imposed on a grant of planning permission can enable many development
proposals to proceed where it would otherwise have been necessary to refuse planning
permission. While the power to impose planning conditions is very wide, it needs to be
exercised in a manner which is fair, reasonable and practicable. Planning conditions should
only be imposed where they are: 
• necessary
• relevant to planning
• relevant to the development to be permitted
• enforceable
• precise
• reasonable in all other respects. 
8.23 It is considered that the conditions subject of this application meets these criteria. 
Page 21 of 50

Page 22

8.24 If the previous permission was subject to a Section 75 obligation or other legal agreement, then
it will be necessary to update this to refer to the new permission. The extant permission
20/00827/FUL is subject to section 75 Legal agreement for impact on Education infrastructure.
No consent can therefore be issued until the developer has completed a revised Section 75
Agreement with the Planning Authority to continue to secure the appropriate level of financial
contribution for education provision. 
9. Conclusions 
9.1 Due consideration has been given to the proposed amendments against the provisions of the
development plan and no substantive reason has been found to warrant the refusal of this
application. Given the provisions of the development plan and circular 4/1998 it is recommended
that the substitution of conditions as amended is accepted and the application is approved,
subject to the attached conditions. 
Page 22 of 50

Page 23

Application No:  
25/00051/FUL
Proposed Development: 
Detached Dwelling with Integral Garage 
Site Address: 
Land At
Woodside Avenue
Kilsyth 
Date Registered: 
13th February 2025 
Applicant:
Mr & Mrs Crainey
C/o Agent 
Agent:
ILG Design
Suite 6
350 Main Street
Camelon
Falkirk
FK1 4EG 
Application Level:
Local Application 
Contrary to Development Plan:
No
Ward:   
01 Kilsyth 
Jean Jones ,Heather Brannan-McVey, Denis
Johnston,
Representations:
7 letter(s) of representation received.   
Recommendation: Approve Subject to Conditions 
Reasoned Justification: The proposed development is acceptable as it could be
accommodated within the site without adversely affecting the residential amenity of
neighbouring properties or residential character of the surrounding area. As such, the proposal
accords with the policy provisions of the Development Plan 
Page 23 of 50

Page 24

Reproduced by
permission of the
Ordnance Survey on
behalf of HMSO. ©
Crown Copyright and
database right 2009.  All
rights reserved.
Ordnance Survey
Licence number
100023396.
Planning Application: 25/00051/FUL 
Name (of applicant): Mr & Mrs Crainey
Site Address: Land At
Woodside Avenue
Kilsyth 
Development: Detached Dwelling with
Integral Garage   
Page 24 of 50

Page 25

Proposed Conditions:- 
1. That, except as may otherwise be agreed in writing by the Planning Authority, the development
shall be implemented in accordance with drawing numbers: - 
A-501, A101 Rev A, A-502 Rev B, A-801 Rev A, A-901 and G24-638-A-502-Rev C 
Reason: To clarify the drawings on which this approval of permission is founded. 
2. That before the development starts, a site investigation shall be submitted to and approved in
writing by the Planning Authority.  This investigation must be carried out in accordance with the
British Standard Code of Practice BS 10175:2011+A2:2017 "The Investigation of Potentially
Contaminated Sites". The report on the site investigation must include a site specific risk
assessment of all relevant pollution linkages with reference to ground contamination, be carried
out in accordance with the Environment Agency publication Model Procedures for the
Management of Land Contamination CLR11, and be submitted in both hard copy and electronic
format.  Depending on the results of this investigation, a detailed ground remediation strategy
may be required.  Any remediation work required identified via the site investigation must be
completed and verification provided by a suitably qualified engineer before the house is occupied. 
Reason: To ensure the site is free of contamination. 
3. That for the avoidance of doubt, any remediation works identified by the site investigation
required in terms of Condition 2 above, shall be carried out to the satisfaction of the Planning
Authority. A certificate (signed by a responsible Environmental Engineer) shall be submitted to
the Planning Authority confirming that any remediation works have been carried out in
accordance with the terms of the Remediation Strategy. 
Reason: To ensure the site is free of contamination. 
4. That a visibility splay of 2.5 metres by 60 metres, measured from the road channel, shall be
provided on both sides of the vehicular access and before the development hereby permitted is
occupied, everything exceeding 1.05 metres in height above the road channel level shall be
removed from the sight line areas and, thereafter, nothing exceeding 1.05 metres in height above
road channel level shall be planted, placed, erected, or allowed to grow, within these sight line
areas. 
Reason: In the interests of traffic and pedestrian safety 
5. That notwithstanding the provisions of the Town and Country Planning (General Permitted
Development) (Scotland) Order 1992, as amended, no changes shall be made to the existing
windows of the dwellinghouse, including modifications, replacements, or the addition of any new
windows hereby permitted, other than that expressly authorised by this permission. 
Reason: To enable the Planning Authority to retain effective control, in order to safeguard the
residential amenity of the area. 
6. That prior to the commencement of development, the applicant shall provide written confirmation
to the Planning Authority that all the requirements of Scottish Water can be fully met to
demonstrate that the development will not have an impact on their assets, and that suitable
infrastructure can be put in place to support the development. 
Reason: To ensure the provision of satisfactory sewerage and surface water drainage
arrangements 
Page 25 of 50

Page 26

7. That BEFORE the development hereby permitted starts, any proposed landscaping shall be
submitted to, and approved in writing by the Planning Authority, and it shall include:- 
(a) details of any earth moulding and hard landscaping, boundary treatment, grass seeding and
turfing;
(b) a scheme of tree and shrub planting, incorporating details of the location, number, variety and
size of trees and shrubs to be planted;
(c) an indication of all existing trees and hedgerows, plus details of those to be retained, and
measures for their protection in the course of development
(d) a detailed timetable for all landscaping works which shall provide for these works being carried
out contemporaneously with the development of the site. 
Reason: To enable the Planning Authority to consider these aspects in detail. 
Background Papers: 
Consultation Responses: 
NLC Infrastructure & Transportation dated 28 February 2025 and 3 March 2025
NLC Protective Services dated 13 March 2025 
Contact Information: 
Alex Reid at 01236 632487 or planningenquiry@northlan.gov.uk 
Report Date:
25th April 2025
Page 26 of 50

Page 27

APPLICATION NO. 25/00051/FUL 
REPORT 
1. Site Description 
1.1  The application site is situated north of the rear garden ground of Clonard, High Barrwood Road
and located within an established residential area. The site is currently vacant but is understood
to have been previously used for a local convenience shop. The site is bound by recently
constructed modern residential dwellings to the north and west, established residential
properties to the east and the Clonard property to the south. 
2. Proposed Development 
2.1 The application seeks full planning permission for the erection of a detached dwellinghouse
with integral garage. 
3. Applicant’s Supporting Information 
3.1 The original proposal was for the erection of a 3 storey dwellinghouse. This was assessed and
viewed as not being in keeping within the area which would also have resulted in a detrimental
impact on the neighbouring properties as such discussions took place with the applicant. 
Revised drawings were submitted to reduce the height of the dwellinghouse which is in keeping
within the residential area. 
3.2 The new proposed development is a 2 storey detached, 3-bedroom dwelling with integral
garage which measures 11.1m in length and 8.6m in width, giving the dwelling a footprint of
95.46sqm. The height of the eaves is 4.8m and a total height of 7.7m. 
3.3 The proposed external finishes consist of white render, anthracite uPVC windows, doors, soffits
and Fascia, Black uPVC downpipes and gutters with Marley Moden Broken Bond Gray concrete
roof tiles. Below the Damp Proof Course Stone will be facing Gleneagles granite facing
brickwork. 
3.4 The proposed front garden has a maximum point of 7.2m and a minimum point of 5.1. The rear
garden is 8.6m in length. While the minimum rear garden depth is not met, the proposed
development is considered acceptable as the position of the dwelling will limit the impact to
neighbouring properties. The integral garage is 1m from the south boundary line, but the main
dwelling is 2.8m away. The dwelling is situated 2.4m from the north boundary line. 
3.5 The front curtilage will accommodate off street parking with 3 spaces available as well as an
integral garage. The internal garage measurements at 3.5m x 6.2m. 
3.6 The boundary of the site will consist of 1.5m high timber fence along the west and north
perimeter. The southern perimeter will consist of a 0.75m brick wall with a 0.75m timber fence
situated on top, 1.5m in total. 
3.7 A design statement was received advising the benefits of including an integral garage rather
than the erection of a detached garage at the rear of the property. These benefits are: 
• For a detached garage vehicles would travel along the side of the property causing
nuisance noise to neighbours
• For a detached garage any work carried out within the garage would be in close proximity
to neighbouring rear gardens- cause noise and irritation.
• A detached rear garage would reduce rear garden size restricting that amenity to the
homeowners
• A detached rear garage would require the construction of large driveway to the side would
reduce garden area. 
Page 27 of 50

Page 28

4. Site History 
• 16/02271/FUL – Erection of Two Storey Dwellinghouse (Application Permitted) granted on
24 May 2017 
5. Development Plan 
5.1 The development plan consists of National Planning Framework 4 (NPF4) adopted on the 13
February 2023 and the North Lanarkshire Local Development Plan (LDP) adopted 2022. 
5.2 Relevant NPF4 Policies are Policy 14 (Design, Quality and Place) and Policy 16 (Quality
Homes).  With regards to the LDP the site is allocated as General Urban Area within the
Placemaking Policies so policy PP3 (General urban Area) and AD3 Policy (Amount of
Development) apply. EDQ 1 (Site Appraisal) and EDQ 3 (Quality of Development) are also
relevant. 
6. Consultations 
6.1 NLC Protective Services were consulted on 21 February 2025, A response was received on 3
March 2025. The following points were raised: 
That before the development starts, a site investigation shall be submitted to and approved in
writing by the Planning Authority.  This investigation must be carried out in accordance with the
British Standard Code of Practice BS 10175:2011+A2:2017 "The Investigation of Potentially
Contaminated Sites". The report on the site investigation must include a site-specific risk
assessment of all relevant pollution linkages with reference to ground contamination, be carried
out in accordance with the Environment Agency publication Model Procedures for the
Management of Land Contamination CLR11, and be submitted in both hard copy and electronic
format.  Depending on the results of this investigation, a detailed ground remediation strategy
may be required.  Any remediation work required identified via the site investigation must be
completed and verification provided by a suitably qualified engineer before the house is
occupied. 
Response. This is covered with Condition 2 
Time limits in relation to noise associated with construction, any external lighting and the
prevention of dust emission beyond the site boundary. 
Response: The above points have been added as informatives 
6.2 NLC Infrastructure and Transportation were consulted on 21 February 2025. A response was
received on 28 February 2025 and 3 March 2025,  advising they have no objections subject to
the points below. 
Improved access crossing may be required, the upgrade should be constructed to standards
indicated in the Design Manual for Roads and Bridges. 
Visibility splay of 4.5m x 60m should be measured from a driver eye height of 1.05m should be
provided in both directions. 
Response: A revised drawing was submitted 20 March 2025 showing the visibility splays. 
Three parking bays and a garage have been provided. This provision is sufficient to meet the
required standards assuming the internal dimensions of the garage comply with the
requirements 3m x 6m. 
Response: It is confirmed that the integral garage meets these requirements as measurements
were taken from the proposed drawings and the internal garage dimensions are: 3.5m x 6.2m. 
Page 28 of 50

Page 29

7. Representations 
7.1  Standard Neighbour Notification letters were issued on the 17 February 2025, after receiving
the revised drawings the neighbours were then renotified on the 14 March 2025, 6 letters of
objection and 1 letter of support were received. The objections raised can be fairly summarised
as follows 
• Three storey building is not in keeping with the surrounding area
• Overlooking issues such which impacts privacy
• Block light in to rear garden 
8. Planning Assessment 
8.1 Section 25 of the Town and Country Planning (Scotland) Act 1997 requires that planning
decisions must be made in accordance with the development plan unless material
considerations indicate otherwise. The application raises no strategic issues and can be
assessed against the local plan. 
8.2 NPF4 forms part of the development plan; given the nature and scale of this development, the
most relevant considerations are already enshrined in the North Lanarkshire Local
Development Plan policies (assessed below). The policies within NPF4 that are relevant to the
application include Policy 14 (Design, Quality and Place), Policy 16 (Quality Homes) 
Policy 14 (Design, Quality and Place) Development proposals will be designed to improve
the quality of an area whether in urban or rural locations and regardless of scale. 
Policy 16 (Quality Homes) encourages, promotes and facilitates the need for more high
quality, affordable and sustainable homes. 
8.3  Assessment: The applicant was advised the original proposal of a three storey dwellinghouse
was not supported by the NPF4 Policies 14 and 16. Revised drawings were submitted to reduce
the height and reassessed against the relevant NPF4 policies. With these changes to the
proposal Policy 14 and Policy 16 within NPF4, support this application as the design is deemed
appropriate in scale and nature and will not harm the residential amenity of the site or general
area. Adequate garden ground would be achieved and there will be minimal impact on the
privacy of the surrounding properties. 
8.4 The proposal must comply with policies set out in PP3 (General Urban Area) and AD3 Policy
(Amount of Development) within the Adopted North Lanarkshire Local Plan 2022. PP3 General
Urban Area Policy seeks to maintain and improve the level of amenity in urban areas, by
encouraging development that is in keeping with their residential character and encouraging
diversity in more mixed-use areas. EDQ 1 (Site Appraisal) and EDQ 3 (Quality of Development)
are also relevant as these policies consider issues such as massing, height, style, finishing
materials of any building, as well as orientation and topography of the site. 
8.5 Assessment: The proposed dwellinghouse has been assessed against the above policies.
The two storey dwellinghouse is viewed as inkeeping with the residential area. The proposal is
considered to be acceptable in relation to Policy EDQ1 and EDQ3 as the proposal improves
the level of the amenity within the urban area in that it will remove a currently vacant site within
the urban area which has been cleared at some point and secured on the Woodside Avenue
boundary by temporary heras fencing . EDQ3 states that development will only be permitted
where high standards of site planning and sustainable design are achieved. The proposal is
considered to be acceptable in all of these respects and can be accommodated without
detriment to the amenity of the surrounding area or adjoining land-uses. 
Page 29 of 50

Page 30

8.6  The matters raised in the letters of representation are addressed in turn below: 
• A three-storey house is not in keeping within the area 
Comment: The three-storey house was assessed, and it was agreed the scale and design was
not suitable for the location of the site. Revised drawings were received to reduce the
dwellinghouse in height which would accommodate a two-storey house which is more inkeeping
of the are and reflective of the house that was previously approved on the site. 
• Overlooking issues impacting on privacy 
Comment: It is viewed that the dwellinghouse will not impact the privacy within any
neighbouring properties because of distances involved, window positions and orientation of
existing dwellings relative to the proposed house. 
• The dwellinghouse will overshadow garden ground 
Comment: Overshadowing of garden ground is not something that can be given any significant
weight.   A 25-degree sunlight/daylight assessment was carried out for both proposals,
assessing the impact the development would have on the Clonard property situated south of
the site. While the three-storey dwelling failed the test, the reduced height of the two-storey
dwelling passed, meaning there would be an acceptable standard of daylight to the Clonard
rear window. It is viewed that, while there will be an impact of sunlight/daylight to the property
north of the site. The impact will be to the rear garden ground and not to any habitable rooms
within the dwelling so is not sufficient to warrant a refusal of permission or redesign. 
8.7 It is worth noting, a planning application was submitted for a two-storey dwellinghouse in 2016,
planning reference 16/02271/FUL. That application was granted on 24 May 2017. The
proposed development was halted due to Covid. 
9. Conclusions 
9.1 In conclusion, considering all the circumstances relevant to this application, the proposed
development is considered acceptable. The proposal will not have a detrimental effect on the
neighbouring properties and character of the surrounding area, therefore, complies with policies
PP 3 General Urban) and AD 3 Amount of Development in North Lanarkshire Local
Development Plan 2022. Taking account of the provisions of the development plan and all other
material considerations, it is recommended that permission be granted subject to conditions. 
Page 30 of 50

Page 31

Application No:  
25/00075/FUL
Proposed Development: 
Change of Use from Care Home Facility to 5 No. Self Contained
Apartments, with Minimal External Alterations 
Site Address: 
1 Abbeyfield House
Colston Road
Clarkston
Airdrie
ML6 7AA 
Date Registered: 
27th January 2025 
Applicant:
Mr Mohammad Akram
10 Balloch Holdings
Cumbernauld
G68 9AT 
Agent:
B3 Architects
Office 875
3 Fitzroy Place, 1/1
Glasgow
G3 7RH 
Application Level:
Local Application 
Contrary to Development Plan:
No
Ward:   
08 Airdrie North 
Alan Beveridge,Sophia Coyle,Henry Emerson
Dunbar,Richard Alan Sullivan,
Representations:
10 letter(s) of representation received.   
Recommendation: Approve Subject to Conditions 
Reasoned Justification: 
The development meets the criteria set out in the residential policies contained within National
Planning Framework 4 and the North Lanarkshire Local Development Plan. The development
is acceptable in terms of its impact upon the property and the surrounding residential area. 
Page 31 of 50

Page 32

Reproduced by
permission of the
Ordnance Survey on
behalf of HMSO. ©
Crown Copyright and
database right 2009.  All
rights reserved.
Ordnance Survey
Licence number
100023396.
Planning Application: 25/00075/FUL 
Name (of applicant): Mr Mohammad
Akram
Site Address: 1 Abbeyfield House
Colston Road
Clarkston
Airdrie
ML6 7AA 
Development: Change of Use from Care
Home Facility to 5 No. Self Contained
Apartments, with Minimal External
Alterations   
Page 32 of 50

Page 33

Proposed Conditions:- 
1. That, except as may otherwise be agreed in writing by the Planning Authority, the development
shall be implemented in accordance with drawing numbers:-  
1125 01; 1125 02; 1125 03; 1125 04A; 1125 05; 1125 06B; 1125 07; 1125 08A; 1125 09A; 
1125 10; 1125 11; 1125 12 & 1125 13           
Reason: To clarify the drawings on which this approval of permission is founded. 
2. That BEFORE the development hereby permitted starts, details of the surface finishes to all
parking and manoeuvring areas shall be submitted to and approved in writing by the Planning
Authority. 
Reason: In the interest of the amenity of the site and the general area. 
3. That before the development hereby permitted is Complete, all the parking and manoeuvring
areas shown on the approved plans, shall be levelled, properly drained, surfaced in a material
which the Planning Authority has approved in writing before the start of surfacing work and clearly
marked out, and shall, thereafter, be maintained as parking and manoeuvring areas. 
Reason: In the interests of traffic safety and visual amenity of the area. 
4. That BEFORE the development hereby permitted starts, full details of the design and location of
all fences and walls to be erected on the site shall be submitted to, and approved in writing by
the Planning Authority and shall thereafter be implemented prior to the dwellinghouses hereby
permitted being occupied. 
Reason: To enable the Planning Authority to consider these aspects in detail. 
5. That unless otherwise agreed in writing by the Planning Authority, before the development hereby
permitted starts, a scheme of landscaping, and boundary treatments, shall be submitted to, and
approved in writing by the Planning Authority and it shall include:- 
a. Details of any earth moulding, grass seeding and turfing; 
b. A scheme of tree and shrub planting incorporating details of the location, number, variety and
size of trees and shrubs to be planted. For the avoidance of doubt these should include native
species, which are beneficial to native wildlife. 
c. An indication of all existing trees and hedgerows, plus details of those to be retained, and
measures for their protection in the course of development. 
d. A timetable for the implementation of these works contemporaneously with the development. 
Reason: In the interest of the amenity of the site and the general area. 
6. That the landscaping scheme approved under the terms of Condition 5 above, shall be
implemented in accordance with said condition and completed BEFORE the flats hereby
permitted are brought into use. For the avoidance of doubt, any trees, shrubs, or areas of grass
which die, are removed, damaged, or become diseased, within 2 years of the completion of the
development, shall be replaced within the following year with others of a similar size and
species. 
Reason: In the interest of the amenity of the site and the general area.  
Page 33 of 50

Page 34

7. That before the occupation of any flats, a management and maintenance scheme shall be
submitted to, and approved in writing by the Planning Authority, and it shall include proposals
for the continuing care, maintenance and protection of:- 
a.  any communal fences and walls;  
b. all other communal areas 
Reason: To ensure the maintenance of communal areas and infrastructure in the interest of
amenity. 
8. That before completion of the development hereby permitted, the management and
maintenance scheme approved under the terms of condition 7 shall be in operation. 
Reason: To ensure there is an adequate landscape maintenance scheme in place. 
9. Notwithstanding the details within condition No. 3 above, the parallel parking spaces 6, 7 & 8
shown on drawing number 1125 06B, shall all be 6m in length. 
Reason: In the interests of traffic safety. 
Background Papers: 
Consultation Responses: 
NLC Protective Services (including Pollution Control) received on 19/02/25 
NLC Infrastructure & Transportation received on 21/02/25 and 27/03/25   
Contact Information: 
Gary McEwan at 01236 632487 or planningenquiry@northlan.gov.uk 
Report Date: 
22nd April 2025
Page 34 of 50

Page 35

APPLICATION NO. 25/00075/FUL 
REPORT 
1. Site Description 
1.1 The site is approximately 0.1 hectares and is a former care home. The site is located on Colston
Road, which is a quiet residential road and has an existing access off from Colston Road.
Colston Road is accessed from Forrest Street which forms part of the A89 road and is a main
thoroughfare within Airdrie. The site is approximately 0.5km east of Airdrie Town Centre. The
site is also reasonably well served by public transport, with links to local bus services on Forrest
Street and with Airdrie Train Station (approximately 1.3km) and Drumgelloch Train Station
(approximately 0.9km) within fairly close proximity. 
2. Proposed Development 
2.1 The proposed development involves the conversion of the former Abbeyfield Care Home to
form five 2-bedroom, flatted dwellings. The flatted development would utilise the existing access
for the care home, and following discussions with the applicant, will now provide 8 off street
parking spaces, with one of these having disabled access within the site. To achieve the
additional parking, the applicant has proposed the removal of the pedestrian pathway at the
access, which will allow for the vehicle access width to be retained. The applicant will also
provide a bike store for use with e-bikes for the residents of the development to use. The
proposal also involves the removal of the existing bin store and replacing this with 2 smaller bin
stores to serve the occupants of the flats. 
3. Applicant’s Supporting Information 
3.1 Alongside the drawings, the applicant has provided a planning statement. 
4. Site History 
4.1 No relevant planning history. 
5. Development Plan 
5.1 National Planning Framework 4 Policies:  
3 (Biodiversity) 
9 (Brownfield, vacant and derelict land and empty buildings) 
13 (Sustainable transport) 
14 (Design quality and place) 
15 (Local Living and 20-minute neighbourhoods) 
16 (Quality homes) 
North Lanarkshire Local Development Plan 2022 Policies:  
PP3 (General Urban Area – Purpose of Place) 
AD3 (General Urban Area – Amount of Development) 
EDQ1 TO EDQ3 (Environmental and Design Qualities) 
Page 35 of 50

Page 36

6. Consultations 
6.1 NLC Protective Services has no objection to the proposal, however they have identified that
the building is in close proximity to potentially contaminated land, namely, railway land, a former
pit and land used for authorised processes. Therefore, it has been indicated that if the presence
of any unsuspected contamination becomes evident during renovations, that this shall be
brought to the attention of the department within one week or earlier. They have indicated that
at this stage a more detailed site investigation to determine the extent and nature of the
contaminant(s), and a site-specific risk assessment of any associated hazards may be required.
It is deemed appropriate to attach an informative to address this matter if the application is
approved. 
6.2 NLC Infrastructure & Transportation objected to the application on the basis of substandard
parking being provided and has indicated that a development for five 2-bedroom flats should
provide 10 parking spaces (1.5 spaces per dwelling, plus 0.3 visitor spaces per dwelling). It
should be noted that initially the applicant proposed two parking spaces with disabled access
alongside an e-bike store to serve the development. Following negotiation with the applicant,
the on-site parking has been increased to 8 parking spaces, one with disabled access, as well
as a slightly smaller e-bike store NLC Infrastructure & Transportation were far more positive
with regard to the significant increase in parking numbers, however, could not recommend
approval on the basis that the parking provided would still fall short of the 10 recommended.
While it is acknowledged that the parking proposed is slightly short of what they have
recommended, it is considered that given that the proposal involves the conversion and re-use
of an existing vacant building and site, as well as its proximity to Airdrie town centre and other
sustainable modes of transport (bus/train), and with the inclusion of an e-bike store, that the
shortfall in parking spaces is acceptable in this instance.  It is also noted that there is the
possibility for limited on street parking in the vicinity of the site and the short access spur road
linking the site to Colston Road serves only the application property. 
7. Representations 
7.1 Following neighbour notification procedure, 10 representations have been received (all
objection) to the application for reasons which can be summarised as follows: 
• Not enough off-street parking provided for the development, leading to additional street
parking, which will impact on road safety.
• Clarification is required with regard to the potential occupants.
• Who will be responsible for upkeep of the site?
• Loss of privacy as these flats will look directly onto many homes. Retaining existing
trees as well as additional planting would mitigate this.
• Noise pollution due to gatherings of residents within communal open space areas.
• Site was intended to be a care home within a small area and was not meant to be  
residential apartments.
• Bats are a protected species, how will the bats currently occupying the property be
dealt with in line with current legislation?
• Additional requirement for refuse collection to be provided by NLC and increased risk
of rodent infestation.
• Disruption during construction/renovation process with regard to skips, large
construction vehicles and labourer vehicles.
• There is a high expectation that no landscaping works will take place. Guarantees
should be provided that existing landscaping shall not be removed. 
8.       Planning Assessment 
8.1 Under section 25 of the Town and Country Planning (Scotland) Act 1997, applications for
planning permission are required to be determined in accordance with the policies of the
development plan unless material considerations indicate otherwise.  The development plan
comprises National Planning Framework 4 (NPF4) and the North Lanarkshire Local
Development Plan 2022 (the LDP), with the former taking precedence in the event of any
conflict between policies.
Page 36 of 50

Page 37

8.2 In terms of National Planning Framework 4 (NPF4), the most notable policies which affect the
proposal are Policies 3 (Biodiversity); 9 (Brownfield, vacant and derelict land and empty
buildings); 13 (Sustainable transport); Policy 14 (Design, Quality and Place) and Policy 16
(Quality Homes). 
8.3 NPF4 policy 3 seeks to protect biodiversity, reverse biodiversity loss, deliver positive effects
from development and strengthen nature networks.  Development proposals should avoid
potential adverse impacts and should contribute to the enhancement of biodiversity including
strengthening nature networks and the connections between them.  Local development
proposals should include appropriate measures to conserve, restore and enhance biodiversity.
Given that the proposal involves limited works to an existing site, it is not considered that the
proposed works would result in a significant loss to biodiversity. However, a condition for a
landscaping scheme to be submitted, has been attached to ensure that the development
enhances the biodiversity of the site. 
8.4 NPF4 policy 9 seeks to encourage, promote and facilitate the reuse of brownfield vacant and
derelict land and empty buildings. This policy is supportive of proposals which involve the reuse
of derelict land and buildings; therefore, the proposed development is considered to be in
accordance with this policy. 
8.5 NPF4 policy 13 seeks to encourage, promote and facilitate developments that prioritise walking,
wheeling, cycling and public transport for everyday travel, reducing the need to travel
unsustainably and states that proposals to improve, enhance, or provide active travel
infrastructure will be supported including electric vehicle charging infrastructure. It also states
that development proposals will be supported where it can be demonstrated that the transport
requirements have been considered in line with sustainable travel, which includes accessibility
with public transport, providing secure and convenient cycle parking to meet needs of users.
Furthermore, it states that development proposals which are ambitious in terms of low/no car
parking will be supported, particularly in urban locations that are well served by sustainable
transport modes and where they do not increase barriers to access by disabled people. It is
considered that the location of the site in terms of its proximity to Airdrie town centre and other
sustainable modes of transport (bus/train), and with the inclusion of an e-bike store, that the
current proposal will encourage the use of more sustainable forms of travel and is therefore in
accordance with this policy. 
8.6 NPF4 Policy 14 states that development proposals should be designed to improve the quality
of an area whether in urban or rural locations and regardless of scale.  Proposals will be
supported if the development is consistent with the six qualities of successful places as set out
in Appendix D of NPF4, namely:- Healthy, Pleasant, Connected, Distinctive, Sustainable and
Adaptable.  It is considered that the proposal is consistent with these qualities bringing back
into use a vacant care home, for residential use, within a largely residential urban area and
without detriment to the surrounding area. It is therefore considered to comply with this policy. 
8.7 NPF4 Policy 16 supports developments for new homes on land allocated for housing in the
LDP.  The application site is within the urban area and the proposed development includes 5
flatted units for housing, so therefore meets the terms of this policy as it helps the Council’s
ambition to reach its target for there being a mix of housing types and size of units within the
area.  It will not have a detrimental impact on the area and is compliant with the general
principles of this policy. 
Page 37 of 50

Page 38

8.8 Within the NLLDP the site is covered by Policy PP3 General Urban Area which seeks to
maintain and improve the level of amenity appropriate for the local context and encourage
diversity in more mixed-use areas.  This policy also requires such proposals to be assessed
against the criteria of AD 3 (Amount of Development), EDQ 1 (Site Appraisal) and EDQ 3
(Quality of Development) which consider issues such as size, materials and road safety and
which states that proposals must integrate successfully with the surrounding area by avoiding
harm to the neighbouring amenity. Given that the proposal is to re-use an existing building with
only minor external alterations, it is considered that the proposal is acceptable in terms of
design. It is also considered that given the largely residential nature of the surrounding
properties and area, that a residential use is the most suitable use for the vacant property,
which will result in no significant impacts to neighbouring residential amenity. In terms of road
safety, initially the applicant proposed two parking spaces with disabled access alongside an
e-bike store to serve the development. Following negotiation with the applicant, the on-site
parking has been increased to 8 parking spaces, one with disabled access, as well as a slightly
smaller e-bike store. Whilst it is acknowledged that the parking proposed is slightly short of
what has been recommended by NLC Infrastructure & Transportation, it is considered that
given that the proposal involves the conversion and re-use of an existing building and site, as
well as its proximity to Airdrie town centre and other sustainable modes of transport (bus/train),
and with the inclusion of an e-bike store, that the shortfall in parking spaces is acceptable in
this instance . Given the nature of the proposal, i.e. the conversion of an existing building, it is
considered that the proposal would not result in any significant sunlight or daylight issues. In
terms of privacy, no new windows are proposed for the existing building, therefore the privacy
situation is not deemed to be any different from when the building was in use as a care home.
In any case, the building is off-set from surrounding dwellinghouses, both in terms of the
directions which the windows face and in terms of ground level, with the existing building having
a lower ground level than the dwellinghouses on Forrest Street. This in conjunction with
distances to neighbouring windows, the closest being 16m, means that the proposal will not
result in any significant privacy concerns. It is therefore considered that the development is
acceptable from a privacy perspective. In terms of amenity space, the Council’s standards for
open space requires 20m2 per bedroom for flatted developments. The amenity space within
the site is approximately 345m2, which equates to just over 34m2 per bedroom. While it is
recognised that a substantial proportion (approximately 172m2) of this is in the form of soft
landscaping (trees/shrubs/plants), the remainder is usable as communal space for the flats. It
is therefore considered that adequate outdoor amenity space will be provided for the
development. It is therefore considered that the proposal complies with Policies PP 3, AD 3,
EDQ 1 and EDQ 3 of the adopted North Lanarkshire Local Development Plan. 
8.9 The development is therefore considered to be consistent with both NPF 4 and NLLDP policies. 
Representations 
8.10 In response to the grounds of representation above in 7.1, these are commented on in the same
order as they appear above:  
• Traffic and Road safety – Whilst it is accepted that the parking to be provided is less than
has been recommended by NLC Infrastructure & Transportation, the applicant has revised
the scheme since the original objection comments were received and has attempted to
provide as much parking as possible within the site. It is considered that given that the
proposal involves the conversion and re-use of an existing building and site, as well as its
proximity to Airdrie town centre and other sustainable modes of transport (bus/train), and
with the inclusion of an e-bike store, that the shortfall in parking spaces is acceptable in this
instance.
• Clarification on occupants – Although not a relevant planning consideration the applicant
has indicated that the flats will either be for sale or private rent.
• Responsibility for upkeep – A condition has been attached which requires the applicant
to arrange factors who will be responsible for the general upkeep of the site and for details
of this to be submitted for written authorisation by the Planning Authority.
• Privacy – As is indicated in paragraph number 8.8 above it is considered that as no new
windows are proposed for the existing building, the privacy situation is not deemed to be
any different from when the building was in use as a care home. In any case, the building is
off set from surrounding dwellinghouses, both in terms of the directions which the windows
Page 38 of 50

Page 39

face and in terms of ground level, with the existing building having a lower ground level than
the dwellinghouses on Forrest Street. This in conjunction with distances to neighbouring
windows, the closest being 16m, means that the proposal will not result in any significant
privacy concerns.
• Noise – Noise generated by residents within communal amenity areas is not a material
planning consideration.
• Site intended to be care home – Whilst it is acknowledged that the original designed use
was as a care home, this does not preclude the property from having a different use,
provided that this use is considered acceptable. The proposed use has been fully assessed
against the local development plan, and it is considered that a flatted development is an
appropriate use for the site and surrounding area.
• Bats – Whilst bats are a protected species, there is no requirement for an applicant to carry
out protected species survey for the re-use of an existing building. The submission of an
ecological report would only be required in certain circumstances where a building is
proposed to be demolished. However, an informative has been attached which advises the
applicant what they need to do if any bat roosts or hibernating bats are found or suspected.
• Refuse collection – Refuse collection is paid for by residents through Council tax. It is not
considered that the proposal will result in an increase in vermin. However, if at a later stage
it is suspected that there is a problem with vermin at the site, then the Council’s
Environmental Health section can be contacted via the Council’s website.  
• Disruption – Disruption during development of the site is not a material planning
consideration. If there are any concerns regarding the conduct, hours of operation or work
practices of the workers while on site, then these can be referred to the Council’s
Environmental Health section for further comment via the Council’s website.
• Landscaping – A condition has been attached requiring submission of a landscaping
scheme for written authorisation of the Planning Authority. 
9.      Conclusions 
9.1 In conclusion, following assessment of the application and notwithstanding the objections
received, it is considered that the proposed flatted development satisfactorily complies with the
criteria set out in the residential policies contained within National Planning Framework 4 and
the North Lanarkshire Local Development Plan. The development is acceptable in terms of its
impact upon the property and the surrounding residential area and is therefore recommended
that planning permission is granted, subject to conditions. 
Page 39 of 50

Page 40

Page 40 of 50

Page 41

North Lanarkshire Council
Report
PLANNING COMMITTEE 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    Index 1 Date 08/05/25 
NOTICE OF PLANNING AND ENFORCEMENT APPEALS LODGED 
From  Pamela Humphries, Chief Officer (Place)  
E-mail humphries@northlan.gov.uk Telephone 01236 632487 
1. Background 
Background 
Application No.      Applicant        Date of Council   Form of  Note
& Proposal          & Site          Decision      Appeal  
24/00951/FUL  Jamie Marshall       21/11/2024 Written Submission
Single Storey   169 Earlston
Shop Unit  Crescent
(Hot Food  Carnbroe
Takeaway)  Coatbridge   
ML5 4UJ   
2. Report 
N/A 
Executive Summary 
1. Purpose of Report 
1.1       This report is to advise the Committee of the undernoted planning appeals      
recently lodged with the Scottish Ministers. 
Recommendations
It is recommended that the Committee notes the position. 
The Plan for North Lanarkshire
Priority  Choose an item.
Ambition statement Choose an item.
Item 3
Page 41 of 50

Page 42

3. Measures of success 
N/A     
4. Supporting documentation 
N/A 
Pamela Humphries
Chief Officer (Place) 
Page 42 of 50

Page 43

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 43 of 50

Page 44

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 44 of 50

Page 45

North Lanarkshire Council
Report
Planning Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    PH/SH Date 08/05/25 
Rediscovering the Antonine Wall Project Update 
From  Pamela Humphries, Chief Officer (Place)
E-mail hodges@northlan.gov.uk Telephone Stuart Hodge, Senior
Project Manager 
1. Background 
1.1 The Antonine Wall runs through five local authority areas across Central Scotland:
Falkirk, North Lanarkshire, East Dunbartonshire, Glasgow and West Dunbartonshire.
In July 2008, it was designated by UNESCO as a World Heritage Site, becoming an
extension of the trans-national ‘Frontiers of the Roman Empire World Heritage Site’
which includes Hadrian’s Wall in England and the German Limes. 
1.2 The Rediscovering the Antonine Wall Project secured National Lottery Heritage
Funding (NHLF) in 2018 for a £2.1 million project that extended across all five local
authorities managing parts of the Antonine Wall, including North Lanarkshire. The
project ran from October 2018 until 31 March 2023 and delivered a variety of projects
Executive Summary 
The purpose of this report is to provide committee with an update on the recent
unsuccessful funding application to the National Lottery Heritage Fund (NLHF) to take
forward phase 2 of the project and its implications for the Antonine Wall project generally
and for West Dunbartonshire Council as lead authority. 
Recommendations
It is recommended that the committee notes: 
1) the outcome of the funding application; 
2) the decision of the Antonine Wall Steering Group to extend the project to 30th
September 2025 using existing funding.  
3) that West Dunbartonshire Council will continue to act as lead authority until 30th
September 2025, at which point the project will be concluded. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement
(16) Transform our natural environment to support wellbeing and
inward investment and enhance it for current and future
generations
Item 4
Page 45 of 50

Page 46

from the installation of Silvanus Roman Head Sculpture at Nethercroy; the Auchinstarry
Play Park;  Replica Distance Stone at Nethercroy and the Auchinstarry marina mural.
The Rediscovering the Antonine Wall project also focused on raising awareness and
engagement including the production of a feature film “The Antonine Wall: a 37 mile
landmark”. An exhibition tour in various locations for 2 years, including Cumbernauld
library, delivered talks, community conferences, consultations and produced various
publications. The project also worked in partnership with Cycling Without Age Scotland
to install an accessible trishaw in Auchinstarry Marina to offer accessible transport. 
1.3 Since 2018 West Dunbartonshire has acted as lead authority for 5 local authority 
partners (West Dunbartonshire, East Dunbartonshire, City of Glasgow, Falkirk and 
North Lanarkshire) and Historic Environment Scotland.   
1.4  A funding bid for a further phase the “Connecting the Antonine Wall” project was made 
to the NLHF in Sept 2024. On the 21 January 2025 the Council received confirmation
from NLHF that the funding bid had been unsuccessful.   
2. Report 
2.1 It is disappointing that the project was unsuccessful for funding. Feedback from the 
National Lottery Heritage Fund (NLHF) was favourable in terms of the quality of the
submission but that they advised that due to the level of demand for their funds, they
were unable to support all projects. Following the refusal of the funding bid it has
been necessary to review the options available to the partners as the funding was
required to take the project forward. Without this funding the project is not financially
viable. 
2.2 Following consideration of options by the Steering Group, which consists of
representation from all partner authorities, it was agreed to use the current balance of
funding to extend the contracts of the two project staff to the 30th September 2025 to
allow the conclusion of current project work and a controlled closure of the project. 
No further financial contributions are required from partner authorities. 
2.3 Once the project ends all partners would assume responsibility for projects in their area.
In North Lanarkshire this includes maintaining access along the Antonine Wall to the
general public. Any access issues must be dealt with directly by NLC whilst discussing
this with Historic Environment Scotland (HES). Any projects to be undertaken in close
proximity to the wall must be coordinated with HES. 
2.4 West Dunbartonshire Council will continue to act as lead authority until the 30
September 2025 to ensure that there is ability to carry out further project work and a
managed wind down of the project. 
3. Measures of Success  
3.1  The Rediscovering the Antonine Wall Project successfully delivered its original aims to:
• Install five replica Roman distance slabs;
• Create five Roman themed play facilities;
• Undertake a series of community led engagement projects;
• Reshoot of a 1960s film charting the route of the Wall;
• Create a 21st Century Legion of community groups involved in the project;
• Develop an outreach programme taking themes and stories related to the Wall to
hub museums;
• Create school resource packs.
Page 46 of 50

Page 47

4. Supporting Documents 
There are no supporting documents 
Pamela Humphries
Chief Officer (Place)  
Page 47 of 50

Page 48

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
As the Antonine Wall projects ends, there will be staffing implications to 2 FTE
posts associated with the delivery of the project. However, these staff are not
employed directly by North Lanarkshire Council. These staff are employed by West
Dunbartonshire Council in its role as project lead. Staff contracts and redundancies
will be handled by West Dunbartonshire Council in accordance with its own HR
policies and relevant employment laws.
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐     
Page 48 of 50

Page 49

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Responsibility for all communication activity linked to the North Lanarkshire part of
the Antonine Wall National Heritage site will revert to the council after 30th
September.
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 49 of 50

Page 50

Page 50 of 50