Agenda Document Pack - Planning Committee - 05/12/2024

North Lanarkshire Council · 5 December 2024
Back to Planning Committee — 5 December 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

26 November 2024 
Members of the 
Planning Committee
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Planning Committee is to be held in the Council
Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Thursday, 05 December
2024 at 10:00 AM which you are requested to attend. 
The agenda of business is attached. 
Archie Aitken
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Mark Hamill
Clerk Telephone: 07811294702
Clerk Email: hamillm@northlan.gov.uk 
N Shevlin, G Currie, B Baudo, G Brennan, B Burgess, A Bustard, J Cairns, T Carragher, M
Coyle, S Coyle, K Docherty, T Fisher, M Hughes, L Jarvie, T Johnston, P Kelly, J Logue, H
Loughran, C McManus, M McPake, L Mitchell, J Reddin, D Robb, A Smith, G Woods.  
Page 1 of 154

Page 2

Page 2 of 154

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000   
2 Planning Applications Index
Submit Planning Applications Index 
5 - 26 
3 North Lanarkshire Local Development Plan -
Delivery Programme
Submit report by the Chief Officer (Place) seeking
approval of the North Lanarkshire Local Development
Plan – Delivery Programme. 
27 - 110 
4 Development Plan Scheme & Participation
Statement 2024 Update
Submit report by Chief Officer (Place) seeking approval
of the Development Plan Scheme and Participation
Statement 2024 update. 
111 - 140 
5 Updated Protocol for Legacy Cases
Submit report by Chief Officer (Place) seeking approval
of the proposed procedures for dealing with Legacy
cases. 
141 - 146 
6 Planning Performance Report
Submit report by Chief Officer (Place) providing
information on the outcome of the submission to the
National Planning Improvement Process and an update
on performance against key performance indicators for
2023-24. 
147 - 154 
Page 3 of 154

Page 4

Page 4 of 154

Page 5

North
Lanarkshire
Council 
Planning Applications for consideration     
of Planning Committee 
Committee Date: 5th December 2024 
Ordnance Survey maps reproduced from Ordnance Survey
with permission of HMSO Crown Copyright reserved 
Item 2
Page 5 of 154

Page 6

APPLICATIONS FOR PLANNING COMMITTEE 
5th December 2024 
Page No Application No  Applicant Development/Site Recommendation    
7-25 21/00226/FUL Anco 
Construction Ltd
Residential Development
(49 Units Comprising 39
Flats and 10 Detached &
and Semi- Detached
Dwellinghouses) and
Associated Infrastructure
Land West Of
Rosehall Road
Shotts 
Grant     
Page 6 of 154

Page 7

Application No:  
21/00226/FUL
Proposed Development: 
Residential Development (49 Units Comprising 39 Flats and 10
Detached and Semi- Detached Dwellinghouses) and Associated
Infrastructure 
Site Address: 
Land West Of
Rosehall Road
Shotts 
Date Registered: 
27th April 2021 
Applicant:
Anco Construction Ltd
Mr Irvine Anderson
First Floor Maxim Business Park
Maxim 1
2 Parklands Way
Eurocentral
Motherwell
ML1 4WR 
Agent:
CD Architects
Studio 5
The Old School Business Centre
40 Rochsolloch Road
Airdrie
ML6 9BG 
Application Level:
Local Application 
Contrary to Development Plan:
No
Ward:   
13 Fortissat 
Martin McCulloch, Margaret Hughes, John Jo
Leckie,
Representations:
25 letter(s) of representation received.   
Recommendation: Approve Subject to Conditions 
Reasoned Justification: 
The proposed development is considered acceptable in terms of the development plan and
meets the criteria set out within NPF 4 and policies PP 3 and AD 3, PROT A Category 5, EDQ
1, EDQ 2 and EDQ 3 of the North Lanarkshire Local Development Plan 2022. The proposed
residential development can be incorporated within the urban site without having a detrimental
impact on the character and amenity of the site and wider area. The proposed development
utilises an area of vacant urban brownfield land, providing opportunities for landscaping and
biodiversity enhancement and sustainable travel to and from the application site and wider
Shotts area 
Page 7 of 154

Page 8

Reproduced by permission of
the Ordnance Survey on
behalf of HMSO. © Crown
Copyright and database right
2009.  All rights reserved.
Ordnance Survey Licence
number 100023396.
Planning Application: 21/00226/FUL 
Name (of applicant): Anco Construction
Ltd
Site Address: Land West Of Rosehall
Road Shotts 
Development: Residential Development
(49 Units Comprising 39 Flats and 10
Detached and Semi-Detached
Dwellinghouses) and Associated
Infrastructure   
Page 8 of 154

Page 9

Proposed Conditions:- 
1.  That, except as may otherwise be agreed in writing by the Planning Authority, the development shall
be implemented in accordance with drawing numbers:- 
H486-A-01A, H486-B-01A, H486-C-01B,
H486-D-01A, H486-E-01A, H486-F-01B,
H486-G-01B, H486-HJ-01A, H486-K-01B,
H486-L-01A, H486-ES-01C, H486-01E,
H486-02R, H486-05J, H486-13D,
H486-14M, H486-16A, 
Reason: To clarify the drawings on which this approval of permission is founded. 
2.  That, notwithstanding the terms of Condition (1) above, the development shall be implemented in
accordance with the site levels shown on drawing number H486-16A, H486-13D, H486-ES-01 C,
H486- 14M, H486-02R and no alterations shall be made to these approved site levels and approved
plans without the prior approval in writing of the Planning Authority. 
For the avoidance of doubt, this condition also includes the requirement for prior approval for
any changes in site levels proposed as a consequence of other formal consent processes
including Roads Construction Consent and the Building Warrant process. 
Reason: To ensure that all new site levels are appropriate for protecting the amenity of the proposed
development. 
3. That, before any development works of any kind (including the clearing of vegetation) starts on the
application site, an updated Extended Phase I Habitat Survey and Protected Species Assessment
(including all necessary surveys in relation to bats and breeding bird activity) shall be provided for
the written approval of the Planning Authority.  Within the updated Extended Phase I Habitat
Survey and Protected Species Assessment a timetable for the implementation of recommendations
should be included for the written approval of the Planning Authority. 
For the avoidance of doubt, as a result of undertaking an updated Extended Phase I Habitat
Survey and Protected Species Assessment, should any mitigation measures be required for
any protected species, this shall be implemented in accordance with the species protection
plan agreed in writing with the Planning Authority in consultation with Naturescot before
works commence on the site. 
Reason: In the interests of protecting nature conservation interests. 
4. That, all recommendations as set out in the updated Extended Phase I Habitat Survey and Protected
Species Assessment approved under the terms of condition 3 above, shall be implemented in full, in
accordance with the timetable approved under the terms of under the terms of condition 3 above,
unless otherwise agreed in writing by the Planning Authority. 
In the interests of protecting nature conservation interests. 
5.  That, before any development works of any kind (including the clearing of vegetation) starts on the
application site, a report which details the exact location of any Japanese Knotweed and Giant
Hogweed within the application site shall be submitted for the written approval of the Planning
Authority. This report should also set out proposals (with timescales) for the eradication and
management of Japanese Knotweed and Giant Hogweed within the application site. 
Reason: In the interests of protecting nature conservation interests. 
Page 9 of 154

Page 10

6. That, prior to any of the dwellings hereby permitted are occupied, unless otherwise agreed in writing
with the Planning Authority, all eradication and management proposals for the Japanese Knotweed
and Giant Hogweed within the application site as set out within the report approved under the terms
of condition 5 above, shall be implemented in full and a certificate (by a suitably qualified Ecologist)
confirming the implementation these proposals shall be submitted to the Planning Authority prior to
the occupation of any of the dwellings hereby permitted. 
Reason: In the interests of protecting nature conservation interests. 
7. That BEFORE any works of any description start on the application site, unless otherwise agreed in
writing with the Planning Authority, a comprehensive site investigation report shall be submitted to
and for the approval of the said Authority.  The investigation must be carried out in accordance with
current best practice advice, such as BS 10175 : 'The Investigation of Potentially Contaminated
Sites' or CLR 11.  The report must include a site specific risk assessment of all relevant pollution
linkages and a conceptual site model.  Depending on the results of the investigation, a detailed
Remediation Strategy may be required. Information on the required format of the report and how it
should be submitted to us can be found online: https://www.northlanarkshire.gov.uk/planning-and-
building/planning-applications/how-discharge-contaminated-land-planning-conditions 
Reason: To establish whether or not site decontamination is required in the interests of the amenity
and wellbeing of future residents. 
8. That any remediation works identified by the site investigation required in terms of Condition 7, shall
be carried out to the satisfaction of the Planning Authority.  A certificate (signed by a chartered
Environmental Engineer) shall be submitted to the Planning Authority, unless otherwise be agreed in
writing by the Planning Authority, prior to any of the dwellings hereby permitted are occupied,
confirming that any remediation works have been carried out in accordance with the terms of the
Remediation Strategy. 
Reason: To ensure that the site is free of contamination in the interests of the amenity and wellbeing
of future residents. 
9. That before any development works start on the application site a scheme of intrusive site
investigation shall be undertaken to establish the exact situation regarding the coal mining legacy on
site and to establish the risks posed to the development by the recorded mine entries. The findings
of the intrusive site investigation shall be submitted to the Planning Authority in the form of a detailed
report for written approval in consultation with the Coal Authority. The remediation works identified
for the treatment of mine entries and shallow coal workings identified by the site investigation
deemed necessary to implement this development shall be outlined in this report. 
Reason: To ensure that matters relating to coal mining risk are adequately addressed. 
10. That before any development works start on the application site any remediation works and/or
mitigation measures to address land instability arising from the mine entry, identified by the intrusive
site investigation required in terms of Condition 9 above, shall be carried out to the satisfaction of the
Planning Authority in consultation with the Coal Authority. Prior to the occupation of the first dwelling
hereby approved, a certificate (signed by a Chartered Engineer experienced in mining works) shall
be submitted to the Planning Authority confirming that the remediation works have been
implemented in accordance with the relevant Coal Authority Guidance. 
Reason: To ensure that matters relating to coal mining risk are adequately addressed. 
Page 10 of 154

Page 11

11. That BEFORE any works of any description being commenced on the application site, unless
otherwise agreed in writing with the Planning Authority, full details of the proposed surface water
drainage scheme, including the period during construction, shall be submitted to the said Authority.
The proposed surface water drainage scheme should include a detailed specification of mitigation
measures to ensure that the Curry Burn is not adversely impacted during the construction period. 
For the avoidance of doubt the drainage scheme must be carried out in consultation with
SEPA and self-certified by a suitably qualified professional as complying with the principles
of Sustainable Urban Drainage Systems (SUDS) in terms of the relevant CIRIA Manual and
other advice published by SEPA. 
Reason: To ensure the provision of satisfactory sewerage and surface water drainage
arrangements. 
12. That the SUDS compliant surface water drainage scheme approved in terms of Condition 11 above
shall be implemented contemporaneously with the development in so far as is reasonably practical.
Within three months of the construction of the SUDS, a certificate (signed by a Chartered Civil
Engineer experienced in drainage works) shall be submitted to the Planning Authority confirming that
the SUDS has been constructed in accordance with the relevant CIRIA Manual and the approved
plans. 
Reason: To ensure the provision of satisfactory sewerage and surface water drainage arrangements. 
13. That BEFORE any works of any description being commenced on the application site, the applicant
shall provide written confirmation to the Planning Authority that all the requirements of Scottish Water
can be fully met to demonstrate that the development will not have an impact on their assets, and
that suitable infrastructure can be put in place to support the development. 
Reason: To ensure the provision of satisfactory sewerage and surface water drainage arrangements. 
14. That prior to any of the dwellings hereby permitted are occupied, unless otherwise be agreed in
writing by the Planning Authority, the access to Rosehall Road shown on drawing H486-02R shall be
completed in full and written confirmation (signed by a suitably qualified Engineer) shall be submitted
to the Planning Authority confirming that the access to Rosehall Road shown on drawing H486-02R
have been constructed and are in operation. 
Reason: To ensure satisfactory vehicular and pedestrian access facilities to the dwellings. 
15. That prior to any of the dwellings hereby permitted are occupied, a visibility splay of 4.5 metres by 60
metres, measured from the road channel, shall be provided on both sides of the vehicular access
onto Rosehall Road and before the last dwelling hereby permitted is occupied everything exceeding
1.05 metres in height above the road channel level shall be removed from the sight line areas and,
thereafter, nothing exceeding 1.05 metres in height above road channel level shall be planted,
placed, erected, or allowed to grow, within these sight line areas. 
Reason: To ensure satisfactory vehicular and pedestrian access facilities to the dwellings. 
16. That prior to any of the dwellings hereby permitted are occupied, the 3m footway shown on drawing
H486-02R along Rosehall Road shall be constructed in accordance with the specifications of the
Roads Authority and as described in the Roads Guidelines published by the said Roads Authority. 
Reason: To ensure satisfactory vehicular and pedestrian access facilities to the dwellings. 
17. That prior to the last dwelling hereby permitted is occupied, all the parking and manoeuvring areas
shown on the approved plans, shall be levelled, properly drained, surfaced in a material which the
Planning Authority has approved in writing before the start of surfacing work, and shall, thereafter, be
maintained as parking and manoeuvring areas. 
Reason: In the interests of traffic and pedestrian safety. 
Page 11 of 154

Page 12

18. That before any works of any description on site, unless otherwise agreed in writing, a detailed
planting schedule, biodiversity enhancement scheme for the landscaping proposals shown on
drawing H486-05J shall be submitted to, and approved in writing by the Planning Authority. A
timescale for implementation of all landscaping, planting and biodiversity enhancement shall also be
submitted to, and approved in writing by the Planning Authority. 
Reason: In the interest of the amenity of the site and the general area. 
19. That all works included in the scheme of landscaping shown on drawing H486-05J and the planting
schedule and biodiversity enhancement scheme approved under the terms of condition 18 above,
shall be completed in accordance with the approved timetable, and any trees, shrubs, or areas of
grass which die, are removed, damaged, or become diseased, within two years of the full occupation
of the development hereby permitted, shall be replaced within the following year with others of a
similar size and species. 
Reason: In the interest of the amenity of the site and the general area. 
20. That BEFORE the development hereby permitted starts, full details of the facing materials to be used
on all external walls and roofs shall be submitted to, and approved in writing by the Planning
Authority and the development shall be implemented in accordance with the details approved under
the terms of this condition. 
Reason: In the interests of the visual amenity of the area. 
21. That before the development hereby permitted starts, full details of the design and location of all
fences and walls (including any retaining walls or fencing in relation to the embankment area shown
on drawing H486-ES-01 C) to be erected on the site shall be submitted to, and approved in writing
by the Planning Authority. A timescale for implementation of all fences and walls (including any
retaining walls or fencing) shall also be submitted to, and approved in writing by the Planning
Authority. 
Reason: In the interests of the visual amenity of the area. 
22. That all fences and walls (including any retaining walls or fencing) approved under the terms of
condition 21 above, shall be completed in accordance with the approved timetable 
Reason: In the interests of the visual amenity of the area. 
23. That before the development hereby permitted starts, a management and maintenance scheme shall
be submitted to, and approved in writing by the Planning Authority, and it shall include proposals for
the continuing care, maintenance and protection of:- 
a) the proposed communal grassed, planted and landscaped areas 
b) any communal walls (retaining or otherwise) or fences  
c) any retaining walls or fencing in relation to the embankment area shown on drawing H486-ES-01
C
Reason: In the interest of the amenity of the site and the general area. 
24. That prior to the last dwelling hereby permitted is occupied, the management and maintenance
scheme approved under the terms of condition 23 shall be in operation. 
Reason: In the interest of the amenity of the site and the general area. 
Page 12 of 154

Page 13

Background Papers: 
Consultation Responses: 
The Coal Authority 
Scottish Environment Protection Agency 
Scottish Water 
Environmental Health (including Pollution Control) 
Traffic & Transportation 
NLC Greenspace 
Education 
Assistant Community Partnership Manager 
Contact Information: 
Any person wishing to inspect these documents should contact Patricia Beaton at
planningenquiry@northlan.gov.uk 
Report Date: 22nd November 2024
Page 13 of 154

Page 14

APPLICATION NO. 21/00226/FUL 
REPORT 
1. Site Description 
1.1 The application site is located within the established urban area of Shotts and is approximately
1.12ha in size. The application site is located off Rosehall Road in Shotts and is to the north and
west of existing residential properties. To the northeast of the application site is a car garage and
band hall and to the north of the site is the Rosehall Road Surgery and a garage workshop. The
proposed development will be access from Rosehall Road. The site has a variety of level differences
with site levels sloping down towards the Curry Burn which flows along the western boundary of the
application site. 
2. Proposed Development 
2.1 The applicant seeks planning permission for a residential development of 49 units which comprises of
five flatted blocked with a total of 39 flats, eight semi-detached dwellinghouses and two detached
dwellinghouses. Associated infrastructure such as parling provision, drainage and the internal road
layout and a new pedestrian and vehicle access onto Rosehall Road are also proposed. 
2.2 It is noted that the application site boundary originally included areas of land to the west of the Curry
Burn to which no development has been proposed. As no development has been proposed to these
areas the applicant has revised the application site boundary to exclude them. The application site
boundary denoted with a red line within drawing H486-01E now only includes land upon which
development is proposed. The other areas of land within the applicant’s ownership are now denoted
with a blue line boundary. 
3. Applicant’s Supporting Information 
3.1  The Applicant has provided the following information:
• Coal Mining Risk Assessment
• Architectural drawings
• Site level and section drawing
• Drainage And Water Management Strategy 
• Flood Risk Modelling Report
• Noise Impact Assessment
• Design and Access Statement
• Extended Phase I Habitat Survey
• Protected Species Assessment Update
• Landscaping proposals
• Daylight Analysis
• Report on Rotary Bores
• Ground Level Tree Survey/Visual Assessment 
4. Site History 
4.1 An application for planning permission (07/01334/FUL) was approved (subject to conditions) in April
2010. This application was also submitted by the current applicant and sought permission for
residential development comprising 43 flats (2 no. 2 storey blocks and 4 no. 3 storey blocks with 4
storey rear basement element) and erection of 10 two storey detached and semi-detached dwellings.
This permission was approved following an appeal to the DPEA and required the completion of a
Planning Obligation (S69 legal agreement). This Planning Obligation related to a financial contribution
towards the improvement of off-site play facilities in lieu of on-site play provision. The S69 was
completed and the contribution of £15,750 was paid to the council in April 2010. 
Page 14 of 154

Page 15

5. Development Plan 
5.1  The Development Plan consists of the North Lanarkshire Local Development Plan and the National
Planning Framework 4 (NPF 4). NPF 4 was adopted by the Scottish Parliament in February 2023
and prevails over any policies in the Local Development Plan that are incompatible with its aims and
objectives. 
5.2  NPF 4 policy 3 Biodiversity sets out criteria by which development should be assessed.
Development proposals should contribute to the enhancement of biodiversity, and development
proposals for major development will only be supported where it can be demonstrated that the
proposal will conserve, restore and enhance biodiversity. 
5.3 NPF 4 policy 13 Sustainable Transport sets out to encourage, promote and facilitate developments
that prioritise walking, wheeling, cycling and public transport for everyday travel and reduce the need
to travel unsustainably. 
5.4 NPF 4 policy 14 Design, Quality and Place seeks to ensure that developments are of a good design
that are not detrimental to the amenity of surrounding area and are consistent with the 6 qualities of
successful places – Healthy, Pleasant, Connected, Distinctive, Sustainable and Adaptable 
5.5  NPF 4 policy 15 - Local Living and 20 Minute Neighbourhoods sets out that to establish this goal
consideration will be given to existing settlement pattern, and the level and quality of interconnectivity
of the proposed development with the surrounding area. 
5.6 NPF 4 policy 16 - Quality Homes supports new homes on land allocated for housing in Local
Development Plans and sets out various requirements including, and not limited, to meeting local
housing requirements, providing or enhancing local infrastructure, facilities or services and improving
the residential amenity of the surrounding area. 
5.7  NPF 4 policy 22 - Flood risk and water management intends to strengthen resilience to flood risk by
promoting avoidance as a first principle and reducing the vulnerability of existing and future
development to flooding.
5.8 The following policies are relevant within the North Lanarkshire Local Development Plan: 
• PP 3 and AD 3 General Urban Area
• PROT A Category 5 Natural Environment - Protected Species 
• CI Contributions to Infrastructure
• EDQ 1 Site appraisal 
• EDQ 2 Specific Features for Consideration 
• EDQ 3 Quality of Development 
5.9 PP 3 and AD 3 General Urban Area
This policy which seeks to maintain and improve the level of amenity in urban areas, by encouraging
development that is in keeping with its often primarily residential character and encouraging diversity
in more mixed-use areas. General Urban Areas are either primarily residential in character or have a
mixture of recognisably urban uses. 
5.10 PROT Natural Environment and Green Network Assets 
Planning permission will only be granted for proposals potentially affecting Local Sites if it can be
demonstrated to the Council’s satisfaction that there will be no adverse impact or that any impacts can
be mitigated in environmental terms relevant to the impact. 
5.11 CI Contributions to Infrastructure 
This policy sets out that the council will seek developer contributions for new developments that
individually or cumulatively generate a requirement for new or enhanced services or infrastructure in
respect of Affordable Housing, Education, Transport and Green Infrastructure, Amenity Space and
Play. 
Page 15 of 154

Page 16

5.12 Environmental and Design Quality Policies   
EDQ 1 – Site Appraisal 
EDQ 2 – Specific Features for Consideration 
EDQ 3 – Quality of Development 
These three policies look for proposed developments to create a successful place or enhance existing
places by integrating successfully into the local area and avoiding harm to neighbouring amenity. To
do this a range of criteria is listed within these policies which includes amongst other things aspects of
design, massing, materials, topography and aspects to protect the existing urban area and its specific
characteristics, assets and attributes. They consider hazardous zones, utilities infrastructure and
management areas and look to promote biodiversity and the environment whilst meeting the
challenges of the climate change via suitable and safe access for all users to promote sustainable
public travel or for example the provision of electrical charge points where the car is still a requirement. 
6. Consultations 
6.1  The following consultation responses have been received in respect of the application. 
6.2 Coal Authority initially objected to this application however following submission of additional
information the Coal Authority has advised that it withdraws its objection and concurs with the
recommendations of the Mining Risk Assessment Report (2 April 2021, prepared by Simpson Mining
& Geotechnical Ltd) that recorded mine entries (shafts and adits) potentially pose a risk to ground
stability and public safety and that intrusive site investigation works should be undertaken prior to
development in order to establish the exact situation regarding it. Should planning permission be
granted conditions requiring the undertaking of a scheme of intrusive investigations and the
implementation of any necessary remediation works and/or mitigation measures should be attached
to any permission. A further condition requiring that, prior to the occupation of the site, a signed
statement which confirms that the site is, or has been made, safe and stable for the approved
development shall be submitted the council’s Planning Service for approval should also be attached
to any permission. 
6.3 Scottish Environment Protection Agency (SEPA) initially objected to this application however
following submission of additional information SEPA has advised that it withdraws its objection and
are satisfied that proposal is in accordance with NPF4 Policy 22 part a) Flood risk and water
management. 
6.4 Scottish Water has no objection to this application. 
6.5 The council’s Pollution Control Service has no objections to the proposed development subject to
site investigations being undertaken. Should this application be approved conditions requiring the
submission of site investigation information and the undertaking of any necessary remedial works
should be attached to any permission. Pollution Control has also required that a noise impact
assessment should be undertaken. A Noise Impact Assessment by Sharps Redmore dated 21st
December 2023 was subsequently submitted. Pollution Control has reviewed this and has advised
that the methodology and conclusions of the report are acceptable and that no additional noise
mitigation measures (such as any particular glazing specifications) are required other than the
planned building and garden plot layouts detailed within the submitted drawings. 
6.6 The council’s Roads Development Service has provided comments in relation to the proposed
access onto Rosehall Road, proposed footways, parking provision, and the development’s internal
road layout. Should this application be approved, conditions in relation to the implementation of the
proposed access and visibility splay should be attached to any permission. 
Page 16 of 154

Page 17

6.7 The council’s Greenspace Development Service has reviewed the landscape proposals and have
advised that they are satisfied with the proposed landscaping for the development. The Greenspace
Development Service has advised that further planting species and biodiversity enhancement
information is required and should this application be approved conditions requiring the submission of
this information should be attached. Following on from this, conditions ensuring the full implementation
and thereafter maintenance of the proposed landscaping also be attached to any permission. The
Greenspace Development Service has also advised that an updated Extended Phase I Habitat Survey
and Protected Species Assessment should be submitted prior to the undertaking of any works on site
should this application be approved. 
6.8 The council’s Learning and Leisure Service has advised that no capacity issues are anticipated within
local schools and no developer contribution has been requested. 
6.9 The council’s Play Service has advised that for a development such as this a developer contribution
towards off-site play provision would usually be required. However, as a developer contribution
towards play provision has previously been paid to the council in relation to planning permission
07/01334/FUL, no additional developer contribution is required in this instance. 
7. Representations 
7.1 Following the advertisement and neighbour notification of this application 24 objections (including
several from the same household) and a single neutral representation were received. 
7.2 In summary, the objections to this application raise concerns in the following areas: 
• Impact on traffic levels and condition of Rosehall Road
• Pedestrian safety concerns including the narrow footways on Rosehall Road
• Concerns about the rail bridge on Rosehall Road
• Impacts on privacy of neighbouring properties
• Impacts on daylight of neighbouring properties
• Impacts on the Curry Burn
• Underground mining concerns within the site
• Impact on existing services, facilities and infrastructure such as schools, shops, doctors and
parking
• Lack of services within local area such as shops
• Concerns about noise from the development
• Concern about impact on existing noise making properties such as the band hall
• Drainage and flooding impacts caused by the proposed development
• Impact on wildlife
• Loss of trees
• Loss of greenspace
• Japanese knotweed concerns
• Lack of social/affordable housing
• Overdevelopment of Shotts
• Overdevelopment of the site
• Development should be on brownfield sites
• The development of Flats is not in keeping with local area 
• The height of the flats is not in keeping with local area 
7.3 Other issue were raised; however, they are not material planning considerations. These include
concerns such as the impact on existing views, impact on mental health, potential increase of vermin
due to the development, speeding on Rosehall Road, impacts caused by construction (dirt, dust,
road closures, noise), possible anti-social behaviour and potential damage to neighbouring
properties. 
7.4 Concerns regarding the council’s neighbour notification procedures have been raised, specifically in
relation to the timescale within which representations can be made and the potential discrimination
such timescales cause to those without access to the internet. 
Page 17 of 154

Page 18

7.5 A request for a Planning Hearing has been made by objectors to the development. Based on the
approved protocol for planning application hearings, as the proposal is recommended for approval
and is not considered to be contrary to the development plan, that the threshold set out for a hearing
has not been met.   
8. Planning Assessment 
8.1  Section 25 of the Town and Country Planning (Scotland) Act 1997 requires that planning decisions
are made in accordance with the development plan unless material considerations indicate otherwise.
The Development Plan comprises the North Lanarkshire Local Development Plan (NLLDP) and the
National Planning Framework 4 (NPF 4) with NPF 4 prevailing over any NLLDP policies that are
incompatible with its aims and objectives. 
National Planning Framework 4 
8.2  The introduction of NPF 4 in February 2023 requires that these policies be taken into account in
assessing all developments. The most appropriate of these are discussed below. 
8.3 NPF 4 policy 3 Biodiversity sets out criteria by which development should be assessed.
Development proposals should contribute to the enhancement of biodiversity, and proposals for local
development will include appropriate measures to conserve, restore and enhance biodiversity. The
proposed development is located out with any designated nature conservation sites. However, due
to an Extended Phase I Habitat Survey and Protected Species Assessment have been submitted by
the applicant which advises that the application site includes areas of dense scrub, grassland, tall
ruderals and semi-natural board-leaved woodland. The site also includes areas of Japanese
Knotweed and Giant Hogweed. There is no evidence within the site of otters, badgers and water
voles. This report concludes that the habitats present on site are not considered to be significant at
the local or regional level. The Greenspace Development Service has advised that an updated
Extended Phase I Habitat Survey and Protected Species Assessment (both by Acorna Ecology Ltd)
should be submitted prior to the undertaking of any works on site should this application be
approved. Conditions in relation to the undertaking of these updated surveys, submission of updated
reports and the implementation of any recommendations within these reports should be attached to
any permission. Conditions requiring the submission of reports detailing the exact location of
Japanese Knotweed and Giant Hogweed within the application site as well eradication proposals
should also be attached to any permission.  
8.4 The applicant has also submitted a Ground Level Tree Survey/Visual Assessment (by Acorna
Ecology Ltd) as part of this application. This Ground Level Tree Survey/Visual Assessment surveyed
trees within the site to determine whether there are any of a high quality and value are located within
the site that should be retained. Acorna Ecology Ltd has advised that there no trees of high quality
and value that should be retained with many being of moderate or low quality and value. It should be
noted that there are no Tree Preservation Orders attached to any trees within the site. It is noted that
the applicant has proposes a scheme of landscaping which is detailed within drawing H486-05J. The
Greenspace Development Service is satisfied with the proposed landscaping scheme and advised
that further planting species and biodiversity enhancement information is required and should this
application be approved conditions requiring the submission of this information should be attached to
any permission. The Greenspace Development Service have advised that should this application be
approved, conditions ensuring the full implementation and thereafter maintenance of the proposed
landscaping be attached to any permission. On assessment, it is considered that the proposed
development would be compatible with policy 3 (Biodiversity) within NPF 4. 
8.5 NPF 4 policy 13 Sustainable transport sets out to encourage, promote and facilitate developments
that prioritise walking, wheeling, cycling and public transport for everyday travel and reduce the need
to travel unsustainably. The application site is well located with opportunities for sustainable travel by
bus within walking distance of the application site. Bus services serving bus stops located on Easter
Road and King Street enable access to a range of destinations such as Harthill, Wishaw General
Hospital, Ravenscraig, Motherwell and Whitburn and other opportunities for onward travel by train
via Shotts Train Station. The proposed layout of the development allows for high quality permeable
walking environments with the installation of 3m wide footpaths along the frontage of the site on
Rosehall Road. The proposed development therefore accords with policy 13 Sustainable transport. 
Page 18 of 154

Page 19

8.6 NPF4 policy 14 Design, Quality and Place seeks to ensure that developments are of a good design
that are not detrimental to the amenity of surrounding area and are consistent with the 6 qualities of
successful places – Healthy, Pleasant, Connected, Distinctive, Sustainable and Adaptable.
Proposals which are poorly designed or detrimental to the amenity of the surrounding area will not
be supported. LDP policies EDQ 1 and EDQ 3 collectively have similar requirements, specifying that
development proposals be subject to an appropriate site appraisal and achieve a high quality of
development. The proposed residential development is considered well designed and would
integrate well within the existing urban area. The applicant proposes the use of traditional finishing
materials such as facing brick and rendered masonry. Whilst the proposed finishing material are
acceptable, should this application be approved a condition requiring the submission of specific
details of the proposed finishing materials for each flatted block and dwellinghouse would be
attached to any permission. It is considered that the development meets the six qualities of
successful places and therefore accords with this policy. 
8.7 NPF 4 policy 15 Local Living and 20 Minute Neighbourhoods intends to encourage, promote and
facilitate the application of the Place Principle and create connected and compact neighbourhoods
where people can meet the majority of their daily needs within a reasonable distance of their home,
preferably by walking, wheeling or cycling or using sustainable transport options. When considering
a proposal, consideration will be given to existing settlement pattern, and the level and quality of
interconnectivity of the proposed development with the surrounding area, including local access to
sustainable modes of transport (local public transport and safe, high-quality walking, and cycling
networks), shopping, education and health, social services and affordable and accessible housing
options. Being within an urban area the application site is well served by road and footpath links, with
further improvement to the footway provision along Rosehall Road being proposed by the applicant.
The site has access to sustainable travel options such as buses which provides direct connections to
large supermarkets within Newmains and Wishaw. The application site is located to the west of
Shotts Town Centre and is within walking distance of local convenience shops providing day to day
provisions. The proposed development is therefore considered to comply with policy 15 of NPF 4. 
8.8 NPF 4 policy 16 Quality Homes seeks to encourage, promote and facilitate the delivery of more high
quality, affordable and sustainable homes, in the right locations, providing choice across tenures that
meet the diverse housing needs of people and communities. It is considered that the proposed
residential development with its mix of accommodation type including flats and semi-detached and
detached dwellinghouses will provide choice for future residents. The proposed development is
therefore considered consistent with this policy. 
8.9 NPF 4 policy 22 Flood risk and water management intends to strengthen resilience to flood risk by
promoting avoidance as a first principle and reducing the vulnerability of existing and future
development to flooding. Part c) of policy 22 advises that development proposals should not increase
the risk of surface water flooding to others, or itself be at risk, manage all rain and surface water
through sustainable urban drainage systems (SUDS) and seek to minimise the area of impermeable
surface. It is noted that SEPA initially objected to this application as additional flood risk modelling was
required.  Following submission of this additional information SEPA has advised that it withdraws its
objection and is satisfied that proposal is in accordance with NPF 4 Policy 22 part a) Flood risk and
water management. 
8.10 Based on the above assessment the proposed development complies with policies 3, 13, 14, 15, 16
and 22 of NPF 4. 
North Lanarkshire Local Development Plan 
Page 19 of 154

Page 20

8.11 The application site is designated as part of the General Urban Area under policies PP 3 and AD 3.
Policy PP 3 and AD 3 seeks to maintain and improve the level of amenity in urban areas, by
encouraging development that is in keeping with its often primarily residential character and
encouraging diversity in more mixed-use areas. General Urban Areas are either primarily residential
in character or have a mixture of recognisably urban uses. To the west of the application site is the
Curry Burn and an area of land (owned by the applicant) which is designated as part of the Countryside
under NLLDP policy PP 5 and AD 5. The applicant originally included this area of Countryside within
the application site boundary despite no development being proposed for this area. The applicant
revised the application site boundary and has excluded this area to the west of the Curry Burn from
this application. In terms of policy PP 3 and AD 3, the proposed development is located with an existing
General Urban Area and will enable an existing vacant site to be developed. The proposal for a
residential development of 49 dwellings would integrate successfully with the existing residential areas
to the south and east. It is therefore considered that this application would comply with policies PP 3
and AD 3. 
8.12 Policy PROT A Category A5 sets out that development that significantly affects a species protected 
by law will only be permitted where an appraisal has demonstrated that the protected species would 
not be compromised; or any significant adverse effects on the protected species are mitigated 
through planning conditions. As detailed above the applicant has submitted an Extended Phase I 
Habitat Survey, July 2021 with April 2023 Update. The habitats present are not considered 
significant at a local or regional level. With regards to protected species, the report advises that due 
to the possibility of bats roosting within the site a series of bat surveys should be completed. 
Similarly for breeding birds further survey to pinpoint any breeding bird activity should be undertaken 
prior to any removal of vegetation. In terms of other protected species, no evidence of otters, 
badgers or water vole has been found. The council’s Greenspace Development Service having 
reviewed the Extended Phase I Habitat Survey, July 2021 with April 2023 Update and Protective 
Species Assessment (dated 2009) has raised no objection to this application and has advised that 
should planning permission be approved, conditions requiring the submission of an updated 
Extended Phase I Habitat Survey and Protected Species Assessment prior to the undertaking of any 
works on site (including the removal of vegetation) should be attached to any permission. Conditions 
in relation to the implementation of any recommendations within these updated reports should also 
be attached to any permission. 
8.13 Where new development is proposed that, individually or cumulatively, generates a requirement for
new or enhanced infrastructure or services in the categories listed, developers will be expected to
contribute towards the provision of the required infrastructure, facilities and services. Policy CI 1
Contributions to Infrastructure sets out the four categories of infrastructure which the council could
seek developer contributions towards. CL1 Category Green Infrastructure, Amenity Space and Play
advises that for all forms of development a contribution towards the creation of green infrastructure,
amenity space and/or the provision of play infrastructure may be expected. For all forms of
development, the Council will secure the required on-site green infrastructure, amenity space and/or
the provision of play infrastructure by planning condition and/or legal agreement. For developments
where off-site provision is preferred or required but cannot be provided directly by the developer or
group of developers the Council will seek contributions to the identified infrastructure. In this case the
council’s Play Service has advised that whilst a developer contribution towards off-site play provision
would usually be required for this type of development, as a developer contribution towards play
provision has previously been paid to the council in relation to a previous planning approval that was
not developed on the application site, no additional developer contribution is required. 
8.14 In relation to policies EDQ 1 the applicant has submitted information in relation to their appraisal of the
application site including architectural and site levels drawings, Coal Mining Risk Assessment,
Drainage and Water Management Strategy, Flood Risk Modelling Report, Noise Impact Assessment,
Design and Access Statement, Extended Phase I Habitat Survey, Protected Species Assessment
Update, Landscaping proposals, Daylight Analysis, Report on Rotary Bores and a Ground Level Tree
Survey/Visual Assessment. 
Page 20 of 154

Page 21

8.15 Policy EDQ 2 Specific Features for Consideration details that the council will consider development in
areas subject to hazards (Hazardous Zones such as Coal Authority High Risk Areas) and other specific
features (utilities infrastructure and management areas) in accordance with plans and protocols of the
relevant managing agencies. The Council will expect applications for Planning Permission to be
accompanied by an assessment of how constraints affect sites dependant on the characteristics of the
site, its surroundings and the form of development. The application site is located within a Coal
Authority High Risk Area and the applicant has submitted a Coal Mining Risk Assessment. As detailed
above the Coal Authority has advised that intrusive site investigation works should be undertaken prior
to development in order to establish the exact situation regarding it. Should planning permission be
granted conditions requiring the undertaking of a scheme of intrusive investigations and the
implementation of any necessary remediation works and/or mitigation measures should be attached
to any permission. A further condition requiring that, prior to the occupation of the site, a signed
statement which confirms that the site is, or has been made, safe and stable for the approved
development shall be submitted the council’s Planning Service for approval should also be attached
to any permission. 
8.16 Policy EDQ 3 Quality of Development sets out that development will only be permitted where high
standards of site planning and sustainable design are achieved. Aspects such as siting; overall layout;
density; form; scale; height; massing; proportion; detailing; colour; materials for the proposed
development need to be considered. Policy EDQ 3 also includes aspects related to creating areas
which provide a sustainable, safe, secure, and convenient access to and from the development that
makes it easy to move around, and is attractive to pedestrians, cyclists, and people with disabilities.
Any development would need to integrate well with public transport, green networks, and wider links.
The assessment of and (where necessary) the mitigation of pollution impacts is also included within
policy EDQ 3. 
8.17 With regard to policy EDQ 3, it is considered that the scale, density, design and overall layout; of the
proposed development would be acceptable and would integrate successfully into the local and wider
urban area. The applicant proposes the use of traditional finishing materials such as facing brick and
rendered masonry which is considered acceptable. Should this application be approved a condition
requiring the submission of specific details of the proposed finishing materials for each flatted block
and dwellinghouse will be attached to any permission. It is noted that as part of the proposed
development the application site will be re-profiled with the existing site levels of areas of the site being
lower from that currently. Drawings H486-16A and H486-13D show the existing site levels and site
sections for the application site and drawings H486-ES-01 C, H486-14M, H486-02R show the
proposed site levels and site sections for the proposed development. The applicant has also provided
details of the finished floor levels for each flatted block and dwellinghouse. Conditions relating to the
implementation of the approved site levels will be included within any permission. 
8.18 In terms of the potential impact of the development on the daylight of neighbouring properties, the
Building Research Establishment’s guide ‘Site Layout Planning for Daylight and Sunlight’ sets out
empirical guidelines and methods for assessing natural light. The 25-degree test is to establish the
effect a proposed building will have on existing properties with regard to obstructing daylight to existing
windows/rooms. The applicant has provided a Daylight Analysis which assesses the potential the
daylight/sunlight impact that the of the flatted blocks in closest proximity to neighbouring properties to
the north, east and south of the application site. 
8.19  With regards to the potential impact on neighbouring properties to the application drawing H486-14M
shows that the impact would be minimal, and it is therefore considered any impact felt would not be
so significant to warrant a refusal in this case. 
Page 21 of 154

Page 22

8.20  In terms of any potential impacts to the privacy of neighbouring properties, to ensure that a
reasonable standard of privacy is maintained minimum distance are required between proposed and
existing properties. For windows that are directly facing each other a minimum distance of 18m (for
residential properties) is usually required. With regards to the Rosehall Surgery building, Block C is
located approximately 7m from the rear wall of the Surgery building. Whilst it is noted that the
distance between the directly facing windows of Block C are less than 18m, it is considered that
given, the non-residential use of the building, the applicant’s proposed boundary fencing and heavy
vegetation to the rear garden of the Surgery will minimise any potential privacy impacts. With
regards to the privacy of neighbouring properties along Parkside Road, should Blocks A and B be
constructed the distance between these Blocks and the Parkside Road properties will be at least
22m, which is 4m over the minimum distance of 18m required for residential properties. For the
property at 60 Rosehall Road, the distance between the nearest facing proposed block, Block L is at
least 28m. It is therefore considered that whilst there may be some potential for overlooking into
neighbouring properties, given the distance between neighbouring properties and the proposed
development, any issues with privacy would be minimal and would not be sufficient to warrant a
refusal in this case. 
8.21 With regards to flooding and drainage, the applicant has provided a Drainage and Water Management
Strategy and a Flood Risk Modelling Report which have been reviewed by SEPA. The Drainage and
Water Management Strategy advises that there is no indication of any fluvial flooding risk within the
site. In terms of surface water flooding, when flooding occurs it usually following intensive and
prolonged rain. The Drainage and Water Management Strategy advises that with the implementation
of a mitigating surface water drainage scheme as part of the development there would be no risk of
surface water flooding. SEPA initially raised concerns regarding the proposed earthworks towards the
western boundary of the application site along which the Curry Burn flows. However, following the
submission of the Drainage and Water Management Strategy and a Flood Risk Modelling Report (both
by the JNP Group) SEPA has withdrawn its objection to the proposed development and is satisfied
that proposal is in accordance with NPF4 Policy 22 a) Flood risk and water management. As part of
the proposed development the applicant proposes a surface water drainage scheme and should this
application be approved, a condition requiring the submission of full details of the proposed surface
water drainage scheme for approval prior to works beginning on site should be attached to any
permission. A further condition requiring confirmation that the approved surface water drainage
scheme has been completed prior to the occupation of any residential dwelling would also be attached
to any permission. 
8.22 In terms of landscaping and biodiversity, as discussed above an Extended Phase I Habitat Survey,
Protected Species Assessment and Ground Level Tree Survey/Visual Assessment (all by Acorna
Ecology Ltd) these were submitted by the applicant for this application. These reports advise that the
proposed development is located out with any designated nature conservation sites and do not
appear to include any protected species such as otters, badgers and water voles. It may however be
home to roosting bats. The site does include Japanese Knotweed and Giant Hogweed; however, the
full extent of these invasive species needs to be determined. The Greenspace Development Service
has advised that an updated Extended Phase I Habitat Survey and Protected Species Assessment
should be submitted prior to the undertaking of any works on site should this application be
approved. Conditions requiring the submission of an updated Extended Phase I Habitat Survey and
Protected Species Assessment (including bat surveys) prior to the undertaking of any works on site
(including the removal of vegetation) should be attached to any permission. Conditions in relation to
the implementation of any recommendations within these updated reports should also be attached to
any permission. Further conditions requiring the submission of reports detailing the exact location of
Japanese Knotweed and Giant Hogweed within the application site as well eradication proposals
should also be attached to any permission.   
Page 22 of 154

Page 23

8.23 As part of the proposed development the applicant has submitted a landscaping proposal (drawing
H486-05J) which details the proposed landscape planting and boundary treatments for the
development. The council’s Greenspace Development Service has reviewed the landscape proposals
and have advised that it is satisfied with the information provided so far and has advised that a further
detailed planting schedule and biodiversity enhancement proposal scheme be provided, should this
application be approved, conditions requiring the submission of this information should be attached to
any permission. The Greenspace Development Service have also advised that should this application
be approved, conditions ensuring the full implementation and thereafter maintenance of the proposed
landscaping be attached to any permission. Whilst it is noted that some boundary treatment
information has been submitted, should this application be approved a condition requiring the
submission of the full details of the design and location of all fences and walls within the development
should be attached to any permission including one that relates to the implementation of the fences
and walls within the development. 
8.24 With regards to the traffic and transportation aspects of policy EDQ 3, the council’s Roads
Development Service has no objection to the proposed development and have provided comments in
relation to the proposed access onto Rosehall Road, proposed footways, parking provision, and the
development’s internal road layout. It is noted that the footway along the west side of Rosehall Road
is discontinuous and only fronts a limited number of existing residential properties. The Roads
Development Service has advised that a 3m wide footway should be provided to the frontage of the
application site as shown on drawing H486-02R. The Roads Development Service has also advised
that a visibility splay of 4.5m by 60m should be provided at the new access on Rosehall Road.
Conditions to ensure the implementation of the proposed access and visibility splay onto Rosehall
Road and the 3m wide footway should be attached to any permission if this application is approved. A
condition to ensure the completion of the development’s internal road layout should also be attached
to any permission. 
8.25 Policy EDQ 3 also includes the requirement for the assessment of and (where necessary) the
mitigation of noise/air pollutants or pollution impacts caused either by the development or within the
development site. The council’s Pollution Control Service has advised that should this application be
approved conditions relating to the submission of site investigation information and the
implementation and verification of any necessary remedial works should be attached to any
permission. In terms of potential noise impacts, Pollution Control required that a noise impact
assessment should be undertaken by the applicant which should consider whether any noise
mitigation measures are required to mitigate nearby noise generating properties such as a band hall
on Rosehall Road. A Noise Impact Assessment by Sharps Redmore dated 21st December 2023 was
submitted. Following a review of this Noise Impact Assessment Pollution Control has advised that
advised that the methodology and conclusions of the report are acceptable and no additional noise
mitigation measures (such as any particular glazing specifications) are required other than the
planned building and garden plot layouts detailed within the submitted drawings. 
8.26 Taking into account the assessment above it is considered that the proposed development would be
consistent with policies EDQ 1, EDQ 2 and EDQ 3. 
8.27 As it is considered that the proposed development is complies with development plan policy and in
particular policies 3, 13, 14, 15, 16 and 22 of NPF 4 and policies PP 3 and AD 3 General Urban
Area, PROT A Category 5, EDQ 1, EDQ2 and EDQ 3 of the North Lanarkshire Local Development
Plan 2022, it is considered that this application should be approved in accordance with Section 25 as
there are any other material considerations that suggest it should be refused. 
8.28 Following the advertisement and neighbour notification of this application 24 objections (including
several from the same household) and a single neutral representation were. A number of the issues
raised by objectors (including impacts on privacy and daylight to neighbouring properties, noise and
mining legacy) have been discussed above with further objections raised highlighted below. 
Page 23 of 154

Page 24

8.29 Concerns in relation to Rosehall Road including potential increase vehicle traffic, the railway bridge,
pedestrian safety and the condition of Rosehall Road have been raised. 
Response: As set out above, the council’s Roads Development Service has been consulted regarding
this application and no concerns regarding the potential increased traffic to Rosehall Road, impact on
the bridge or the condition of Rosehall Road have been raised by NLC Roads Development Service.
With regards to pedestrian safety, the applicant proposes a 3m wide footway along the frontage of the
application site which the Roads Development Service have advised should be conditioned if this
application is approved. 
8.30 Concerns in relation to the developments impact on wildlife within the site, the loss of greenspace,
loss of trees and presence of Japanese knotweed have also been raised. 
Response: It is noted that the application site originally included an area of land to the west of the
Curry Burn which is designated as part of the Countryside within the NLLDP. As no development has
been proposed the applicant has restricted the application site boundary to the area where
development would occur. The applicant has submitted an Extended Phase I Habitat Survey,
Protective Species Assessment and Ground Level Tree Survey/Visual Assessment as part of this
application and proposes landscaping and enhancement measures as part of the development. The
council’s Greenspace Development Service has been consulted regarding the proposed development
and have no objection to the development. Further details of the council’s Greenspace Development
Service’s comments are outlined above. With regards to Japanese Knotweed, it is the responsibility
of the applicant to prevent its spread and take any necessary remedial action. Should this application
be approved conditions requiring the submission of reports detailing the exact location of Japanese
Knotweed and Giant Hogweed within the application site as well eradication proposals would also be
attached to any permission. 
8.31 The concerns raised regarding potential drainage, flooding (including impact on the Curry Burn). 
Response: The proposed development includes proposals for drainage provision and both Scottish
Water and SEPA have been consulted regarding this application. Conditions to ensure the submission
of a detailed drainage scheme and its subsequent implementation should be attached to any
permission. Furthermore, it is the applicant’s responsibility to ensure that this provision complies with
the relevant requirements of both Scottish Water and SEPA. 
8.32 The objectors have raised concerns regarding the overdevelopment of Shotts and that the
development as proposed represents an overdevelopment of the site. Concerns regarding the design
and composition of the development have also been raised. 
Response: As part of our assessment of any application the siting; overall layout; density; form; scale;
height; massing; proportion; detailing; colour; materials for the proposed development are considered.
In this case the proposed development is located within a site designated as part of the urban area
and would enable a vacant brownfield site to be development. As detailed above it is considered that
the scale, density, design and overall layout of the proposed development would be acceptable and
would integrate successfully into the local and wider urban area. 
8.33  The lack of social/affordable housing proposed within the site has been raised. 
Response: The need for social and affordable housing is an important issue and the council has an 
important part of play in ensuring availability. Policy CI Contributions to Infrastructure within the 
NLLDP sets out the council’s development plan policy on affordable housing which advises that for 
residential developments in the Cumbernauld Housing Sub-Market Area the council will seek to 
secure 20% affordable housing provision. Whilst the objector’s concerns regarding affordable 
housing provision is noted, no need for provision has been identified in this case. 
8.34 Concerns regarding the lack of services within Shotts and the impact that the development would have
on them are noted. 
Response: The proposed is located within walking distance of Shotts Town Centre which provides a
variety of services for the community. It is considered that the future residents of the development
could have a positive impact on these services with their additional footfall. Whilst the objector’s
concerns regarding a lack of services in Shotts are noted, the provision of such services is outside the
scope of this application. 
Page 24 of 154

Page 25

8.35 With regard to concerns about the council’s neighbour notification procedures for application, the
objectors consider that the neighbour notification process and the timescale within which
representations can be made as potentially discriminatory to those without access to the internet.
Response: The advertisement and neighbour notification of this application has been undertaken in
line with the statutory requirements of the planning legislation which have been set out nationally by
the Scottish Government following appropriate wider consultation. 
8.36 Other concerns were raised by objectors including potential impact on existing views, impact on mental
health, potential increase of vermin due to the development, Speeding on Rosehall Road, impacts
caused by construction (dirt, dust, road closures, noise), possible anti-social behaviour due to the
development and potential damage to neighbouring properties. 
Response: Whilst it is appreciated that these issues are important to nearby occupiers, they do not
represent material considerations which can be considered as part of the assessment of this
application. 
8.37  It is considered that, in this instance, the concerns raised by objectors do not represent material
considerations that are so significant that would warrant a refusal in this case. 
9. Conclusions 
9.1 The proposal is considered acceptable in terms of the development plan and meets the criteria set
out within policies PP 3 and AD 3, PROT A Category 5, EDQ 1, EDQ2 and EDQ 3 of the North
Lanarkshire Local Development Plan 2022. The proposed residential development can be
incorporated within urban site without having a detrimental impact on the character and amenity of
the site and wider area. 
9.2 The proposed development also complies with policies 3, 13, 14, 15, 16 and 22 of NPF 4 as it
utilises an area of vacant urban brownfield land, providing opportunities for landscaping and
biodiversity enhancement and sustainable travel to and from the application site and wider Shotts
area. 
Page 25 of 154

Page 26

Page 26 of 154

Page 27

North Lanarkshire Council
Report
Planning Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref     Date 05/12/24 
North Lanarkshire Local Development Plan – Delivery Programme 
From  Pamela Humphries, Chief Officer (Place)  
E-mail laingg@northlan.gov.uk Telephone Gordon Laing,
07970018874 
1. Background 
1.1 The North Lanarkshire Local Development Plan (NLLDP) was adopted in July 2022.
Following adoption of the NLLDP, the Action Programme was finalised in September
2022. The Action Programme sets out actions to deliver the NLLDP.   
1.2 The Planning (Scotland) Act 2019 (Commencement No.12 and Saving and Transitional
Provisions) Regulations amended the process of preparing an Action Programme. The
2019 Act renames Action Programmes as Delivery Programmes. This is to more
Executive Summary
The purpose of this report is to seek Planning Committee approval of the North Lanarkshire
Local Development Plan – Delivery Programme. The purpose of this document is to set
out how North Lanarkshire Council propose to implement the adopted North Lanarkshire
Local Development Plan. 
The Delivery Programme will play a key part in supporting the actions required to take
forward the Plan and in doing so will help to drive and co-ordinate the actions and activities
of a range of agencies and organisations. 
Recommendations
It is recommended that the Committee: 
1) Agrees the Delivery Programme appended to this report for publishing and
sending to the Scottish Ministers. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work All Programmes of Work
Item 3
Page 27 of 154

Page 28

accurately describe and emphasise the purpose of the document, which is to deliver
and achieve outcomes, rather than monitor specific actions. 
1.3 In June 2024, a letter from the Chief Planner (Scottish Government) was sent to all
planning authorities regarding action and delivery programmes. This letter outlined that
Scottish Ministers require planning authorities to review their current action
programmes for constituted local development plans and update these and publish it
as a delivery programme. Ministers expect local authorities to have this complete by 31
March 2025. 
1.4 The council is now required to review, update, consult and re-publish the Action
Programme as a Delivery Programme. This will be the first Delivery Programme for
North Lanarkshire Local Development Plan (2022) and replaces the Action Programme
2022. 
1.5 Preparation of the new North Lanarkshire Local Development Plan 2 (NLLPD2) is now
underway. This will be a transitional Delivery Programme, until we are in position to
update and publish a Delivery Programme which will align with and be prepared from
the outset of the new North Lanarkshire Local Development Plan 2 (NLLDP2). Delivery
Programmes prepared for NLLDP2 will be presented to full council for approval, as
required under the new Regulations. 
Housing Delivery in Scotland & North Lanarkshire Context
1.6 Although not the sole purpose of new style delivery programme, the delivery of
housing is a key aspect of them and their preparation. More detail on the inclusion of
housing land pipelines in such programmes was addressed in a ministerial statement
and Planning and the Housing Emergency – Delivery Plan published on 12th
November 2024. The context for the statement is that across Scotland there are sites
with planning permission that could deliver more than 164,000 homes but aren’t and
setting out measures to identify the reasons for this and actions to be taken to support
delivery.
1.7 Across North Lanarkshire there are currently 69 sites, in our land supply, with
unimplemented planning permission that could deliver 8,266 homes as well as 61
sites allocated for housing with capacity for 3,455 further homes but for which the
owner or developer has not sought planning permission. 11 sites with a capacity for
2,374 homes currently have applications pending.
1.8 Sites with unimplemented permissions range from having a capacity between 4 –
1,058 units. 17 sites with a capacity of circa 100 units or more have a total capacity to
deliver a further 6,512 units (79%). Average annual completions are currently around
1,100 units and recently there has been a significant contribution to this number from
the Council’s drive to build 5,000 houses for social rent by 2035. 
Number of
sites
Total capacity Number of
years from
allocation or
permission
Sites size
range
(units)
Active
permissions
(under
construction)
46 4,339 2- 17
(permission)
4 – 535
Unimplemented
permissions
69 8,266 0- 19
(permission)
4- 1,058
Page 28 of 154

Page 29

Allocations
without
permissions 
72 5829 0- 18
(allocated)
4- 489 
1,9 In recognition that we could introduce new support mechanisms for planned
development the Council has set up its Invest Team in Planning and Place which will
play a key role in facilitating development and investment in North Lanarkshire,
including - providing bespoke advice to developers to assist coordinating and
speeding up the statutory consent process; managing major planning applications in
close collaboration with other council services and agencies; and taking a lead role in
reviewing and enhancing the end-to-end process for statutory consents. 
1.10 This initiative, and a survey of development sites detailed in section 2 of this report,
was carried out in advance of this Government announcement of steps to identify the
reasons for stalled sites and the setting up of a Housing Planning Hub to provide
brokerage support for major housing developments which have stalled in the system
including, for example, bringing planning authorities together with applicants and key
agencies to identify any barriers which require additional information or action to
overcome.
2. Report 
2.1  The purpose of the Delivery Programme is to set out how North Lanarkshire Council
propose to implement the adopted North Lanarkshire Local Development Plan, and in
doing it sets out:
- A list of actions required to deliver policies and proposals contained in the LDP,
including, where appropriate, reference to NPF4 policies;
- An explanation as to how those actions are to be undertaken;
- The timescale for the conclusion of each action; and 
- The expected sequencing of, and timescales for, delivery of housing on sites
allocated in the LDP. 
Deliverable Housing Land Pipeline
2.2 National Planning Framework 4 outlines that the Delivery Programme is expected to
establish a deliverable housing land pipeline for the Local Housing Land Requirement,
so that interventions, including infrastructure, that enable delivery can be planned.
In line with the Scottish Government’s Local Development Planning Guidance, the
annual Housing Land Audit will monitor the delivery of housing land to inform the
pipeline and the actions to be taken in the Delivery Programme. 
2.3 As part of the work for the preparation of this delivery programme and to inform our
deliverable housing land pipeline we carried out a survey of housing sites to identify
when they would be brought forward for development and what barriers there were to
them being developed sooner. This work was initiated by the Council with the support
of Homes for Scotland as part of our regular dialogue on housing matters and the
programming of housing delivery. 
2.4 To assist in these considerations we take account of Homes for Scotland’s Housing
Land Audit Procedures paper which provides realistic standard assumptions on lead
in timescales. These are:
• The build time for a house is approximately 20 weeks.
Page 29 of 154

Page 30

• From start on site to first lawful completion takes at least 9-12 months. This can
take longer, however.
• No start can be made on site until access and all statutory consents are in place.
• It can take, on average, 24-36 months from submission of a planning application to
the delivery of the first units4. Where the site is in the hands of a developer at the
time of application, this timeframe may be shorter.
2.5 The paper also sets out realistic default assumptions (in the absence of ‘live’
information from a HfS member company) on maximum annual completions rates
which are as follows:
Type of Site Location Assumed Build out Rate Per Annum (Locational
Marketability/Demand Must Be Considered)3
Detached/Semi-
Detached
Urban 30-40 
Detached/Semi-
Detached
Rural 10-20
Flats Urban 35-60
Flats Rural 15-25
Consortium Sites  2 builders: 55-65
3 builders: 80-120
Small Sites  Based on recorded previous completions over the
past five years. 
2.6 Sites at Section 2 of the Delivery Programme (proposed Housing Development Sites)
are allocated as short (1-3 years), medium (4-6 years) and long-term (7-10 years)
phasing. This replaces the ‘5-year effective housing land supply’ requirement which
was previously set out in national policy. The HLA 2024 which has informed the
deliverable housing land pipeline is included within appendix 1 of the Delivery
Programme. Appendix 1 of the Delivery Programme sets out the full deliverable
housing land pipeline for North Lanarkshire. All existing housing land supply sites
(including NLLDP sites) will be reviewed as part of the new LDP process for NLLDP2
and the HLA 2024 presents the basis for this. 
Consultation and Responses
2.7 In preparing the Delivery Programme, key agencies, Scottish Ministers and internal
Council services have been consulted. The Council has a duty to review the Delivery
Programme and republish it every two years. 
2.8 Several of the key agencies including Transport Scotland, SPT and NatureScot  
responded that they did not have any comments to make on the draft Delivery
Programme. SEPA provided an update to their guidance, which has been reflected in
the finalised Delivery Programme (Appendix 1). Scottish Water provided an update on
specific sites and infrastructure, these updates have been reflected in the finalised
Delivery Programme. 
2.9 Homes for Scotland also provided comments, which in summary included:
1) that we reflect the finalised Housing Land Audit (HLA) for 2024 in the Delivery
Programme. At the point of consultation of the draft Delivery Programme, the 2024 HLA
was in draft form. This is nearing completion and will be replaced at Appendix 1 of the
Delivery Programme to reflect the final HLA 2024. 
Page 30 of 154

Page 31

2) Additional comments highlighted the need for Delivery Programmes to include
further detailed information on costs, infrastructure, and timescales, as well as site
briefs and masterplans. It is important to note that the current Delivery Programme is
a transitional document until the new North Lanarkshire Local Development Plan 2
(NLLDP2) is drafted. Through the preparation of NLLDP2, the council will be seeking
and gathering the further information required for individual sites. 
Delivery Programmes should be developed alongside the new Local Development
Plan from the beginning. NLLDP2 will require a comprehensive Delivery Programme,
providing more site-specific information than the transitional one attached to the
current NLLDP. In response to the new requirements, we have included a housing
land pipeline delivery that aligns with the Housing Land Audit 2024. 
3. Measures of success 
3.1  An established programme which assists in the facilitation of delivering the policies and
proposals of the North Lanarkshire Local Development Plan.     
4. Supporting documentation 
4.1 Appendix 1 – Delivery Programme 2024   
Pamela Humphries 
Chief Officer (Place) 
Page 31 of 154

Page 32

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 32 of 154

Page 33

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 33 of 154

Page 34

Appendix 1 
NORTH LANARKSHIRE LOCAL DEVELOPMENT PLAN 
Delivery Programme    
December 2024 
North Lanarkshire Council 
Enterprise & Communities
Page 34 of 154

Page 35

1 
1. Introduction 
This is the first Delivery Programme for North Lanarkshire Local Development Plan (2022) and replaces the Action Programme 2022. The
Planning (Scotland) Act 2019 (Commencement No.12 and Saving and Transitional Provisions) Regulations amended the process of
preparing an Action Programme. The council is now required to review, update, consult and re-publish the Action Programme as a Delivery
Programme. 
The purpose of this document is to set out how North Lanarkshire Council propose to implement the adopted North Lanarkshire Local 
Development Plan, and in doing so it sets out:
• a list of actions required to deliver policies and proposals contained in the LDP;
• an explanation as to how those actions are to be undertaken;
• the timescale for the conclusion of each action; and
• the expected sequencing of, and timescales for, delivery of housing on sites allocated by the LDP.
The Delivery Programme will play a key part in supporting the actions required to take forward the Plan and in doing so will help to drive
and co-ordinate the actions and activities of a range of agencies and organisations.  
In preparing the Delivery Programme, key agencies, Scottish Ministers and internal Council departments have been consulted. The Council
will review the Delivery Programme and republish it every two years. This will be a transitional Delivery Programme, until we are in position
to update and publish the next Delivery Programme which will align with the new North Lanarkshire Local Development Plan 2 (NLLDP2).
The current timetable for the new NLLDP2 indicates that the associated NLLDP2 Delivery Programme will be published in draft for
consultation in 2026. 
The North Lanarkshire Local Development Plan and accompanying documents can be viewed at: Current North Lanarkshire Local
Development Plan | North Lanarkshire Council 
2. North Lanarkshire Housing Delivery Pipeline
Page 35 of 154

Page 36

2 
National Planning Framework 4 outlines that the Delivery Programme is expected to establish a deliverable housing land pipeline for the
Local Housing Land Requirement, so that interventions, including infrastructure, that enable delivery can be planned. Therefore sites at
Section 2 (proposed Housing Development Sites) are split into short (1-3 years), medium (4-6 years) and long-term (7-10 years) phasing.
This replaces the ‘5-year effective housing land supply’ requirement which was previously set out in national policy. The draft Housing Land
Audit (HLA) 2024 has informed the deliverable housing land pipeline, this is attached at Appendix 1. 
All existing housing land supply sites (including NLLDP sites) will be reviewed as part of the new LDP process for NLLDP2 and the draft
HLA 2024 presents the basis for this. The draft HLA 2024 (see Appendix 1) shows the current indicative pipeline programming of all
housing sites within that audit. In line with the Scottish Government’s Local Development Planning Guidance, the annual housing land audit
will monitor the delivery of housing land to inform the pipeline and the actions to be taken in the Delivery Programme.
The Minimum All-Tenure Housing Land Requirement (MATHLR) for North Lanarkshire is identified in NPF4 (Annex E) as 7,350 units for a
ten-year period, or 735 per year (annualised). This figure is the Local Housing Land Requirement (LHLR) for the purposes of monitoring
delivery. 
3. Format of Delivery Programme 
This Delivery Programme broadly aligns with the layout of the Local Development Plan, focusing on the implementation of Policies, the
Area Strategies and Supplementary Guidance as set out in the order below:   
Section 1
Promoting and Protecting Policies 
- PROMote Development Locations and Infrastructure (PROM) 
- PROTecting Assets (PROT) 
Placemaking Policies
- Purpose of Place (PP)
- Amount of Development (AD)
- Contributions to Infrastructure (CI) 
- Environmental & Design Qualities (EDQ) 
Page 36 of 154

Page 37

3 
Section 2
Area Strategies
- Airdrie Local Area Partnership
- Bellshill Local Area Partnership
- Coatbridge Local Area Partnership
- Cumbernauld & Kilsyth Local Area Partnership
- Motherwell Local Area Partnership
- Northern Corridor Local Area Partnership
- Wishaw Local Area Partnership 
Section 3
Supplementary Guidance 
Appendix 1 – Draft Housing Land Audit 2024 (including indicative pipeline programming) 
Page 37 of 154

Page 38

4 
Section 1: Promoting and Protecting Policies/Placemaking Policies
All planning applications will be assessed against NPF4 to ensure proposals are compliant with the relevant policies in NPF4 and the Local
Development Plan. Where there is incompatibility between National Planning Framework 4 policy and NLLDP, NPF4 takes precedence.
Promoting and Protecting Policies 
Reference Policy Action Additional Specific
Requirements
Responsibility
for Delivery
Timescale Progress and Notes
PROM LOC
1
Regeneration
Priorities
Delivery of Town
Centre Action
Plans,
Masterplans &
Locality Plans as
identified in Area
Strategies. 
Policy & Strategy
Team/ Growth
Team, HES
Ongoing  New Ravenscraig Masterplan approved June 2019.
New £3.7m public park was completed July 2021.
Construction of new north-south active travel link
connecting the Regional Sports Facility and new
public park with Craigneuk is now complete.  
The Ravenscraig Access Infrastructure South
project, connecting Motherwell and Ravenscraig via
Airbles Road to the Regional Sports Facility, was
completed in September 2023. 
Building of the dual carriageway from Ravenscraig
Regional Sorts Facility to Motherwell and the
junction at Airbles Road/Windmillhill Street has
been programmed with site clearance and building
demolition works due to begin imminently. 
The Economic Regeneration Delivery Plan 2023-
2028 sets out how the council will improve
economic opportunities and outcomes for everyone
in North Lanarkshire. 
Phase 2 of the Council’s tower re-provisioning
programme is now underway – this includes 8 high-
Page 38 of 154

Page 39

5 
rise tower blocks and 8 low-rise blocks identified as
part of the demolition strategy. 
Town Action Plans have been prepared for Airdrie,
Bellshill, Kilsyth, Motherwell, Wishaw and Shotts. 
The Town Action Plan for Coatbridge will be
delivered through the ‘Long Term Plan for
Coatbridge’ which follows a template required by
the UK Government to enable access to £19.5m
Levelling Up Funding. 
A masterplan is currently being developed for
Cumbernauld which will involve large-scale
regeneration. The town centre was acquired by the
council in June 2023. 
PROM LOC
2
Business
Development
Sites
Monitor industrial
and business land
throughout North
Lanarkshire. 
Policy & Strategy
Team
Complete  Industrial and business land monitoring complete
for 2023. 
Study underway of the supply and condition of
commercial and industrial buildings and land in
Glasgow City Region (GCR). 
PROM LOC
3
Housing
Development
Sites 
Undertake
monitoring in
relation to
housing sites
throughout North
Lanarkshire and
produce the
Housing Land
Audit. 
Policy & Strategy
Team
Ongoing Assess related planning applications against NPF4
to ensure proposals are compliant with the relevant
policies in NPF4 and the Local Development Plan.
Where there is incompatibility between National
Planning Framework 4 policy and NLLDP, NPF4
takes precedence. In this instance, NPF4 Policy 16
f) should be applied. 
Housing Land Audit undertaken for 2024 and
awaiting finalisation (expected Q3 2024). 
Page 39 of 154

Page 40

6 
Strategic Housing Investment Plan 2024/25–
2028/29 identifies affordable housing investment
priorities over next five years. 
PROM LOC
4
Special
Landscape
Areas & Green
Network
Improvements
Promotion and
protection of the
special landscape
areas, Seven
Loch Wetland
Park and Green
Network. 
Deliver green network
improvement
opportunities identified
in the Area Strategies 
Policy & Strategy
Team/ GCVGNP 
Planning & Place
Team/NLC
Greenspace
Ongoing Project to restore Garrell Burn, Kilsyth and
improvements to Dumbreck Local Nature Reserve
(NLC and SEPA £2m) complete. 
Ravenscraig £3.7m public park completed July
2021 and new active travel route between
Craigneuk and New College Lanarkshire
Motherwell Campus at Ravenscraig now open. 
PROM ID1 Transport
Improvements
Delivery of
projects listed in
the strategies of
the Policy and the
Area Strategies
including Glasgow
City Region City
Deal
Infrastructure
Fund projects. 
Policy & Strategy
Team/ NLC
Roads/City Deal
Team/Transport
Scotland/SPT/Sus
trans
Ongoing Infrastructure Fund allocated £240 million of
investment across North Lanarkshire – A8/M8
corridor access improvements; Gartcosh/Glenboig
community growth area (Glenboig link road
complete) and Pan-Lanarkshire orbital transport
corridor. 
East Airdrie Link Road providing a more direct
north-south link between the M8 and Cumbernauld,
consultants have been appointed for stage 3 to
develop the design for the preferred option. 
Ravenscraig Infrastructure Access (RIA) project, as
part of the wider Pan Lanarkshire Orbital Corridor,
is underway (RIA South) with new rail bridge build
complete.   
Motherwell Rail Station Transport Hub completed
2023 and next stage of the project focusing on
improving routes for pedestrians and cyclists in
Motherwell is underway.   
Aecom have been commissioned to undertake a
Local Transport Strategy for North Lanarkshire. 
Page 40 of 154

Page 41

7 
PROM ID2 Utilities
Improvements
Encourage use of
capacity from
heat producing
sources for heat
networks
identified through
the National Heat
Map.
Promote potential heat
energy network
sources as identified in
Area Strategies
Policy & Strategy
Team/
Infrastructure
Team
Ongoing 
Ongoing
Local Heat and Energy Efficiency: Strategy and
Delivery Plan approved 2023. 
SPG 12 Wind Turbine Developments to be updated
(as non-statutory guidance in line with changes to
planning legislation) to include all renewables. 
PROT A Natural
Environment &
Green Network
Assets
Safeguard
heritage assets. 
Planning & Place
Team; NLC
Greenspace;
SEPA;
NatureScot
Ongoing 
Ongoing
Continue to protect these assets by making
planning decisions in line with the policy. 
Associated Supplementary Planning Guidance 20
Biodiversity and Development to be updated (as
non-statutory guidance in line with changes to
planning legislation). 
PROT B Historic
Environment
Assets
Safeguard historic
environment
assets. 
Continue to
protect these
assets by making
decisions in line
with Policy PROT
B. 
Planning & Place
Team; HES
Complete 
Ongoing 
Ongoing 
Ongoing
Conservation Area Regeneration Schemes (CARS),
including the current Coatbridge CARS completed
31st March 2020. 
Cumbernauld Village and Coatbridge (Blairhill &
Dunbeth) Conservation Area Appraisals and
Conservation Area Management Plans currently
being revised. 
Kilsyth and the Kelvin Valley Framework and Action
Plan published May 2018. 
The Rediscovering the Antonine Wall Project
completed 2023, including Roman head sculpture
Silvanus and a replica distance stone installation at
the Nethercroy Site of the Antonine Wall. 
Frontiers of the Roman Empire (Antonine Wall)
World Heritage Site Supplementary Guidance was
adopted Nov 2023. 
PROT C Mineral
Resources
Safeguard
mineral resources 
Planning & Place
Team
Ongoing  Continue to protect these assets by making
planning decisions in line with the policy. 
Page 41 of 154

Page 42

8 
and prevent
sterilisation.
Ongoing SPG11 Minerals to be updated (as non-statutory
guidance in line with changes to planning
legislation) to include all identified Minerals
Resources. 
Placemaking Policies
Reference Policy Action Additional Specific
Requirements
Responsibility
for Delivery
Timescale Progress and Notes
PP 1A Strategic Town
Centres
Support and
encourage a range
of appropriate uses
and improvements
to the physical
environment to help
maintain the role
and function of the
Strategic Town
Centres. 
Planning & Place
Team
Ongoing 
Complete 
Ongoing
Town Action Plans have been developed for Airdrie,
Motherwell, Wishaw, Kilsyth, Bellshill and Shotts. 
Council has acquired The Centre, Cumbernauld
and is overseeing the ongoing management of the
property alongside preparation of a capital
management investment plan and developing
proposals for the long-term management of the
Centre. 
Ravenscraig Masterplan was approved June 2019.
Ravenscraig Infrastructure Access (RIA) project, as
part of the wider Pan Lanarkshire Orbital Corridor,
is underway (RIA South) with new rail bridge build
complete.   
Economic Regeneration Delivery Plan 2023 – 2028
published.   
Retail Outlet Survey for 2023 – 2024 near
completion.     
Assess related planning applications against NPF4
to ensure proposals are compliant with the relevant
policies in NPF4 and the Local Development Plan.
Where there is incompatibility between National
Planning Framework 4 policy and NLLDP, NPF4
takes precedence.
AD 1A Strategic Town
Centres
Assess the amount
of development
Submit appraisal or
assessment as part of
Planning & Place
Team
Ongoing Assess related planning applications against NPF4
to ensure proposals are compliant with the relevant
Page 42 of 154

Page 43

9 
proposed is
appropriate as
required. 
any development
proposal, as required.
policies in NPF4 and the Local Development Plan.
Where there is incompatibility between National
Planning Framework 4 policy and NLLDP, NPF4
takes precedence. There are no retail assessment
thresholds as NPF4 does not differentiate between
town and local centres. In this instance, NPF4
Policy 27 and 28 should be applied.
PP 1B Other Town
Centres
Support and
encourage a range
of appropriate uses
and improvements
to the physical
environment to help
maintain the role
and function of
other Town
Centres. 
Planning & Place
Team, HES
Ongoing 
Complete 
Ongoing
Town Action Plans have been developed for Airdrie,
Motherwell, Wishaw, Kilsyth, Bellshill and Shotts. 
Council has acquired The Centre, Cumbernauld
and is overseeing the ongoing management of the
property alongside preparation of a capital
management investment plan and developing
proposals for the long term management of the
Centre. 
Retail Outlet Survey near completion for 2023-
2024.   
Assess related planning applications against NPF4
to ensure proposals are compliant with the relevant
policies in NPF4 and the Local Development Plan.
Where there is incompatibility between National
Planning Framework 4 policy and NLLDP, NPF4
takes precedence.
AD 1B Other Town
Centres
Assess the amount
of development
proposed is
appropriate as
required.
Submit appraisal or
assessment as part of
any development
proposal, as required.
Planning & Place
Team
Ongoing Assess related planning applications against NPF4
to ensure proposals are compliant with the relevant
policies in NPF4 and the Local Development Plan.
Where there is incompatibility between National
Planning Framework 4 policy and NLLDP, NPF4
takes precedence. There are no retail assessment
thresholds as NPF4 does not differentiate between
town and local centres. In this instance, NPF4
Policy 27 and 28 should be applied.
PP 1C Local Centres Encourage a range
of uses and a level
of development in
these centres to
meet the needs of
their localities. 
Planning & Place
Team
Complete 
Ongoing
Retail Outlet Survey near completion for 2023-
2024. 
Assess related planning applications against NPF4
to ensure proposals are compliant with the relevant
policies in NPF4 and the Local Development Plan.
Where there is incompatibility between National
Page 43 of 154

Page 44

10 
Planning Framework 4 policy and NLLDP, NPF4
takes precedence.
AD 1C Local Centres Assess the amount
of development
proposed is
appropriate as
required.
Submit appraisal or
assessment as part of
any development
proposal, as required.
Planning & Place
Team
Ongoing Assess related planning applications against NPF4
to ensure proposals are compliant with the relevant
policies in NPF4 and the Local Development Plan.
Where there is incompatibility between National
Planning Framework 4 policy and NLLDP, NPF4
takes precedence. There are no retail assessment
thresholds as NPF4 does not differentiate between
town and local centres. In this instance, NPF4
Policy 27 and 28 should be applied.
PP 2A Strategic
Business
Centres
Encourage large
scale business
users to locate in
our Strategic
Business Centres,
safeguard against
other inappropriate
uses and support
upgrading of
premises,
amenities, access,
parking and green
space. 
Planning & Place
Team
Complete 
Ongoing
Industrial and business land monitoring complete
for 2023. 
Assess related planning applications against NPF4
to ensure proposals are compliant with the relevant
policies in NPF4 and the Local Development Plan.
Where there is incompatibility between National
Planning Framework 4 policy and NLLDP, NPF4
takes precedence.
AD 2A Strategic
Business
Centres
Assess the amount
of development
proposed is
appropriate as
required.
Submit appraisal or
assessment as part of
any development
proposal, as required.
Planning & Place
Team
Ongoing Assess related planning applications against NPF4
to ensure proposals are compliant with the relevant
policies in NPF4 and the Local Development Plan.
Where there is incompatibility between National
Planning Framework 4 policy and NLLDP, NPF4
takes precedence.
PP 2B Local
Business
Centres 
Encourage small,
medium and large
sized enterprises to
locate in our Local
Business Centres,
safeguard against
other inappropriate
uses and support
upgrading of
premises, 
Planning & Place
Team
Complete 
Ongoing
Industrial and business land monitoring complete
for 2023. 
Assess related planning applications against NPF4
to ensure proposals are compliant with the relevant
policies in NPF4 and the Local Development Plan.
Where there is incompatibility between National
Planning Framework 4 policy and NLLDP, NPF4
takes precedence.
Page 44 of 154

Page 45

11 
amenities, access,
parking and green
space. 
AD 2B Local
Business
Centres
Assess the amount
of development
proposed is
appropriate as
required.
Submit appraisal or
assessment as part of
any development
proposal, as required.
Planning & Place
Team
Ongoing Assess related planning applications against NPF4 
to ensure proposals are compliant with the relevant
policies in NPF4 and the Local Development Plan.
Where there is incompatibility between National
Planning Framework 4 policy and NLLDP, NPF4
takes precedence.
PP 2C Visitor
Economy
Areas &
Locations
Support provision
of tourism and
leisure facilities in
the Visitor
Economy
Locations. 
Planning & Place
Team
Ongoing 
Complete 
Complete 
Ongoing
Strathclyde Country Park – the Watersports Centre
at the Park will be redeveloped into a low-carbon
health hub over the next three years (2024 – 2027). 
Ravenscraig £3.7m public park completed July
2021 and active travel route 2023.
Broadwood Retail Park opened autumn 2019. 
Drumpellier Country Park Visitor Centre renovation
complete 2019. 
Assess related planning applications against NPF4
to ensure proposals are compliant with the relevant
policies in NPF4 and the Local Development Plan.
Where there is incompatibility between National
Planning Framework 4 policy and NLLDP, NPF4
takes precedence.
AD 2C Visitor
Economy
Areas &
Locations
Assess the amount
of development
proposed is
appropriate as
required. 
Submit appraisal or
assessment as part of
any development
proposal, as required.
Planning & Place
Team
Ongoing Assess related planning applications against NPF4
to ensure proposals are compliant with the relevant
policies in NPF4 and the Local Development Plan.
Where there is incompatibility between National
Planning Framework 4 policy and NLLDP, NPF4
takes precedence.
PP 3 General Urban
Area
Maintain and
improve the level of
amenity in urban
areas, by
encouraging
development that is
in keeping with their 
Planning & Place
Team
Ongoing Assess related planning applications against NPF4
to ensure proposals are compliant with the relevant
policies in NPF4 and the Local Development Plan.
Where there is incompatibility between National
Planning Framework 4 policy and NLLDP, NPF4
takes precedence. 
Page 45 of 154

Page 46

12 
residential
character and
encouraging
diversity in more
mixed-use areas.
AD 3 General Urban
Area
Assess the amount
of development
proposed is
appropriate as
required. 
Submit appraisal or
assessment as part of
any development
proposal, as required.
Planning & Place
Team
Ongoing Assess related planning applications against NPF4
to ensure proposals are compliant with the relevant
policies in NPF4 and the Local Development Plan.
Where there is incompatibility between National
Planning Framework 4 policy and NLLDP, NPF4
takes precedence.
PP 4  Green Belt Protect setting of
communities,
support
regeneration by
directing growth to
urban areas,
protect natural
assets and promote
green belt as
defined on the
Proposals Maps. 
Planning & Place
Team
Ongoing Assess related planning applications against NPF4
to ensure proposals are compliant with the relevant
policies in NPF4 and the Local Development Plan.
Where there is incompatibility between National
Planning Framework 4 policy and NLLDP, NPF4
takes precedence. 
AD 4 Green Belt Assess the amount
of development
proposed is
appropriate as
required. 
Submit appraisal or
assessment as part of
any development
proposal, as required.
Planning & Place
Team
Ongoing Assess related planning applications against NPF4
to ensure proposals are compliant with the relevant
policies in NPF4 and the Local Development Plan.
Where there is incompatibility between National
Planning Framework 4 policy and NLLDP, NPF4
takes precedence.
PP 5 Countryside Support the
countryside, as
defined on the
Promote Map, by
accommodating
limited
development such
as Visitor Economy
related
development,
extending existing 
Planning & Place
Team
Ongoing Assess related planning applications against NPF4
to ensure proposals are compliant with the relevant
policies in NPF4 and the Local Development Plan.
Where there is incompatibility between National
Planning Framework 4 policy and NLLDP, NPF4
takes precedence. In this instance, NPF4 Policy 17
and 29 should be applied. 
Page 46 of 154

Page 47

13 
businesses and
settlements, and
agricultural
diversification.
AD 5 Countryside Assess the amount
of development
proposed is
appropriate as
required. 
Submit appraisal or
assessment as part of
any development
proposal, as required.
Planning & Place
Team
Ongoing Assess related planning applications against NPF4
to ensure proposals are compliant with the relevant
policies in NPF4 and the Local Development Plan.
Where there is incompatibility between National
Planning Framework 4 policy and NLLDP, NPF4
takes precedence. In this instance, NPF4 Policy 17
and 29 should be applied.
Page 47 of 154

Page 48

14 
CI Contributions
to
Infrastructure
Secure developer
contributions for
new developments
that, individually or
cumulatively,
generate a
requirement for
new or enhanced
infrastructure or
services. 
Affordable Housing -
20% affordable
housing provision is
sought in
Cumbernauld Housing
Sub-Market Area.
Education -
Requirement for
contributions towards
educational
infrastructure for all
new residential
development
proposals resulting in
5 or more dwellings,
on a case-by-case
basis, where an
identified need has
been demonstrated.
Transport - Full details
of any transport
infrastructure will be
identified by the
Council as Transport
Authority on a case-
by-case basis through
the Development
Management process. 
Green Infrastructure,
Amenity Space and
Play - For all forms of
development, a
contribution towards
the creation of green
infrastructure, amenity
space and/or the
provision of play
infrastructure may be
expected. 
Planning & Place
Team
Ongoing 
Ongoing
Associated Affordable Housing Supplementary
Guidance was adopted in 2023. In accordance with
the provisions of NPF4 Policy 16 e) (ii) this SG sets
out locations or circumstances where a lower
contribution is justified (20% applicable
Cumbernauld Housing Sub-Market Area). 
Education Contributions Supplementary Guidance
is currently being prepared. 
Page 48 of 154

Page 49

15 
EDQ 1 Environmental
& Design
Qualities: Site
Appraisal
Appraise
development
proposal to ensure
it will integrate
successfully into
the local area and
avoid harm to
neighbouring
amenity.
Site appraisal required
to accompany
planning application.
Planning & Place
Team
Ongoing Associated SPG 15 Good design toolkit will require
to be updated (as non-statutory guidance in line
with changes to planning legislation). 
EDQ 2 Environmental
& Design
Qualities:
Specific
Features for
Consideration 
Consider
development in
areas subject to
hazards
(Hazardous Zones)
and other specific
features (utilities
infrastructure and
management
areas) identified in
this Policy, in
accordance with
plans and protocols
of the relevant
managing
agencies.
When applicable, an
assessment of how
constraints affect the
site is required to
accompany planning
application.
Planning & Place
Team
Ongoing Planning and Noise Supplementary Guidance was
adopted in 2023.  
EDQ 3 Environmental
& Design
Qualities:
Quality of
Development
Promote and
achieve high
standards of site
planning and
sustainable design.
Planning applications
will require to take
account of the Site
Appraisal required by
Policies EDQ1 and, if
appropriate, EDQ2,
assets protected under
Policy PROT, any
evaluation of design
options, and achieves
high quality
development.
Planning & Place
Team
Ongoing Associated
SPG 15 Good design toolkit
SPG 01 Landscaping, SPG 01A Landscaping
supplement
SPG 02 Trees and development,
SPG 07 Green belt
SPG 17 Accessibility for all, SPG17 Accessibility
Appendix
Existing advice on open space and play area
standards, minimum standards for space around
houses, minimum parking standards will require to
be updated (as non-statutory guidance in line with
changes to planning legislation). 
Page 49 of 154

Page 50

16 
Section 2: Area Strategies
The tables below highlight possible actions and issues to be addressed prior to obtaining planning permission, in relation to the proposed
development sites in the Local Development Plan (confirmed by Examination). However, it should be noted that this list is not exhaustive, and
any applicant should contact Development Management for up-to-date information on what may or may not require to be submitted with a
planning application. Applicants will always be advised to contact utility or infrastructure providers to obtain up-to-date advice on current
requirements and standards. The Development Management process may require relevant site investigations to determine land conditions. The
process should also be used to alleviate, mitigate and avoid adverse impacts on the immediate and surrounding environment.  
Also outlined below are the ‘Transport Improvements’ listed under each Area Strategy, most of which are related to the Glasgow City Region
City Deal Infrastructure Fund. 
For the purpose of clarification and completion, where sites included in the Local Development Plan have since been granted planning
permission (or minded to grant subject to planning permission subject to Section 75 Agreement), this has been noted within the tables. It is not
expected further actions are required for the purpose of this Delivery Programme, other than the completion of a Section 75 Agreement where
specified. 
Further Information/Developer Advice 
The Scottish Environmental Protection Agency’s (SEPA) Future Flood Maps can be used to identify areas at risk of flooding to help ensure a
precautionary approach is taken to flood-risk from all sources. National Planning Framework 4 defines ‘at risk of flooding or in a flood risk area’
as land or built form with an annual probability of being flooded of greater than 0.5% which must include an appropriate allowance for future
climate change. This risk of flooding is indicated on SEPA’s future flood maps or may need to be assessed in a flood risk assessment. An
appropriate allowance for climate change should be taken from the latest available guidance and evidence available for application in Scotland. 
SEPA is a statutory consultee in the planning process and applicants will always be advised to consult with SEPA on matters pertinent to flood
risk. 
SEPA Flood Maps, including Future Flood Map - https://map.sepa.org.uk/floodmaps
SEPA Flood Risk Management Plans - https://www2.sepa.org.uk/frmplans/
Page 50 of 154

Page 51

17 
SEPA Air Quality Management Areas (also shown on the Local Development Plan Map Book) -
http://www.scottishairquality.scot/laqm/aqma?id=379 
Please refer to Local Development Plan ‘EDQ 2 Policy Special Features for Consideration’ for further detail on areas subject to hazards and
other specific features, in accordance with plans and protocols of the relevant managing agencies. 
NatureScot work to improve the natural environment in Scotland, ensuring it is maintained and enhanced to the benefit of all. When bringing
forward development proposals, consideration should be given to any potential impacts on the natural environment. NatureScot provide useful
planning and development advice for developers which can be found here - 
www.nature.scot/professional-advice/planning-and-development 
Coal Authority - Much of North Lanarkshire has been subject to coal mining activity, which can result in unstable land. If a site falls within a
high risk area then a risk assessment prepared by a competent person needs to accompany your planning application. This may identify the
need for intrusive site investigations and/or remediation measures prior to development.
Historic Environment Scotland (HES) - Developers should give consideration to potential impacts on the historic environment when bringing
forward proposals. This should be supported by an assessment where impacts on the areas historic environment are likely.  
Scottish Power - There is some general guidance that developers should be aware of when considering development near infrastructure.
Energy Networks Association (ENA) Technical Specification 43-8 provides details of overhead line clearances that should be maintained. The
Health & Safety Executive has also produced guidance for working near overhead power lines (HSG6) and underground services (HSG47). We
would expect that careful consideration is given to potential impact on infrastructure at all stages.
Scottish Water - Developers must consider Scottish Water’s Surface Water Policy when designing for Brownfield sites and appropriate above
ground sustainable surface water drainage must be incorporated into early design of new developments as connection to combined networks is
not promoted. Scottish Water encourage early engagement with developers to identify where suitable capacity exists currently and to consider
any likely extended delivery timescales in other locations where significant engineering or investment is required by Scottish Water. Design
principles and guidance should incorporate water sensitivity into development proposals at all scales. 
Page 51 of 154

Page 52

18 
Links to other useful information 
o South Cumbernauld Community Growth Area - www.northlanarkshire.gov.uk/index.aspx?articleid=32096    
o Gartcosh/Glenboig Community Growth Area - www.northlanarkshire.gov.uk/index.aspx?articleid=27904  
o South Wishaw Community Growth Area - www.northlanarkshire.gov.uk/CHttpHandler.ashx?id=7551&p=0 
o DPMTAG Bargeddie & Carnbroe - www.northlanarkshire.gov.uk/CHttpHandler.ashx?id=22692&p=0 
o Cumbernauld / Newmains & Wishaw DPMTAG -  https://www.northlanarkshire.gov.uk/CHttpHandler.ashx?id=22693&p=0 
o Antonine Wall - www.antoninewall.org/
o Frontiers of the Roman Empire (Antonine Wall) World Heritage Site Supplementary Planning Guidance -
www.northlanarkshire.gov.uk/CHttpHandler.ashx?id=7466&p=0 
o For full list of Council Supplementary Planning Guidance  -  www.northlanarkshire.gov.uk/index.aspx?articleid=24294 
o Glasgow City Region City Deal - www.northlanarkshire.gov.uk/index.aspx?articleid=31901 
o NLC Development Planning information - https://www.northlanarkshire.gov.uk/planning-and-building/development-plans 
o Historic Environment Policy for Scotland 2019 and associated Managing Change Guidance notes -
www.historicenvironment.scot/advice-and-support/planning-and-guidance/historic-environment-policy-for-scotland-heps/ 
o Historic Environment Scotland - www.historicenvironment.scot/   
o Canmore - https://canmore.org.uk/ 
Strategic Flood Risk Assessment – North Lanarkshire 
A strategic flood risk assessment (SFRA) has been prepared for the whole of North Lanarkshire. The SFRA reviews the predicted flood risk and
the historical flood incidents within each area. It sets out actions to be taken forward for each area, to investigate, and manage flood risk in a
Page 52 of 154

Page 53

19 
sustainable way. Identifying areas at risk from flooding will allow for future flood protection and alleviation schemes to be planned and
prioritised accordingly. 
The SFRA identifies 12 Potentially Vulnerable Areas (PVAs)* that fall entirely or partially within the administrative boundaries of North
Lanarkshire and shown below in Figure 1 and listed as follows: 
• 02/10/10 Falkirk and Grangemouth 
• 02/10/13 Livingston, Broxburn and Bathgate 
• 02/10/15 West Calder and Fauldhouse 
• 02/10/16 Slamannan 
• 02/11/04 River Kelvin 
• 02/11/06 Glasgow City North 
• 02/11/07 Luggie Water catchment
• 02/11/09 Coatbridge and Airdrie 
• 02/11/10 East of Glasgow to Strathaven 
• 02/11/11 Clyde catchment – Motherwell to Larkhall 
• 02/11/13 Shotts 
• 02/11/14 North of Wishaw 
*It should be noted that PVAs are subject to review and therefore may change. In addition, PVAs cover 82% of North Lanarkshire. Flooding
may affect other communities outside of the established PVA boundaries and the Strategic Flood Risk Assessment relates to North Lanarkshire
in its entirety. 
Page 53 of 154

Page 54

20 
Figure 1: PVAs within North Lanarkshire Council boundary 
Page 54 of 154

Page 55

21 
New/Updated Supplementary Guidance
Below is details of Supplementary Guidance which has recently been adopted and forms part of the North Lanarkshire Local Development Plan
2022.   
Affordable Housing Supplementary Guidance 2023
Associated Affordable Housing Supplementary Guidance was adopted in 2023. In accordance with the provisions of NPF4 Policy 16 e) (ii) this
SG sets out locations or circumstances where a lower contribution is justified (20% applicable to Cumbernauld Housing Sub-Market Area).
Planning and Noise Supplementary Guidance 2023
Planning and Noise Supplementary Guidance expands upon North Lanarkshire Council Local Development Plan policies: Policy EDQ 2C –
Management Areas and Policy EDQ 3(part e) – Quality of Development, Guidance. The main purpose of this guidance is to assist developers,
decision makers, agents, residents and others to identify issues to be addressed in any application for development in which noise will be an
important consideration when assessing that application.
Antonine Wall Supplementary Guidance 2023
This Supplementary Guidance provides advice for developers, decision makers and the public on managing the impact of development on the
Frontiers of the Roman Empire (Antonine Wall) World Heritage Site (FRE(AW)WHS) and its setting. The guidance supports the implementation
of the development plan policies agreed by the five Councils along the Antonine Wall: Falkirk, North Lanarkshire, East Dunbartonshire,
Glasgow City and West Dunbartonshire 
Page 55 of 154

Page 56

22 
Airdrie Local Area Partnership – Area Strategies 
Transport Improvements
Project/ Action Responsibility for Delivery Timescales Progress
The installation and upgrade of
cycle/walking routes as detailed in
the M8 Strategic Investment Sites
Cycle Access Study 2013 report
Strathclyde Partnership for
Transport/NLC
Ongoing Ongoing works improving cycle
access – particularly around
Eurocentral and Holytown
Station.  Funded through SPT
capital projects.
Improvements to bus and rail
infrastructure 
NLC/ Strathclyde Partnership for
Transport/Network Rail
Ongoing Ongoing discussions with SPT with
regard to setting up a Bus
Improvement Partnership along the
A89 corridor. 
General improvements to bus
infrastructure (bus shelter
maintenance contract now handled
mainly by SPT) along with the
proposed installation of Real Time
Passenger Information throughout
the network – starting with the A89. 
Park and Ride facility at Wishaw
Station extended 2019.
General road safety improvements
for route action plans and accident
improvement plans for locations
identified with high numbers of injury
accidents.
NLC/ Police Scotland Ongoing Ongoing rolling programme of route
improvements based on accident
stats.
Page 56 of 154

Page 57

23 
Project/ Action Responsibility for Delivery Timescales Progress
Glasgow City Region City Deal
Infrastructure Fund projects: A8/M8
Corridor Access Improvements
NLC/ Glasgow City Region City Deal Ongoing  Strategic Business Case approved
August 2015 for A8/M8 corridor
access improvements. 
Outline Business Case approved
June 2017 for Holytown Link Road.
New Eurocentral sustainable
transport project has been proposed
for City Deal funding. 
Outline Business Case for A8/M8
Corridor Access Improvements
Project approved Aug 2022.
Plans approved for improved access
to business sites at 8/M8 – new road
access junction and active travel
facilities. 
Glasgow City Region City Deal
Infrastructure Fund projects: Pan-
Lanarkshire Orbital Transport
Corridor 
NLC/Glasgow City Region City
Deal/Transport Scotland/Strathclyde
Partnership for Transport/ScotRail
Ongoing Infrastructure Fund allocated £240
million of investment across North
Lanarkshire – A8/M8 corridor access
improvements; Gartcosh/Glenboig
community growth area (Glenboig
link road complete) and Pan-
Lanarkshire orbital transport
corridor. 
East Airdrie Link Road providing a
more direct north-south link between
the M8 and Cumbernauld,
consultants have been appointed for
stage 3 to develop the design for the
preferred option. 
Ravenscraig Infrastructure Access
(RIA) project, as part of the wider
Pan Lanarkshire Orbital Corridor, is
underway (RIA South) with new rail
bridge build complete.   
Page 57 of 154

Page 58

24 
Project/ Action Responsibility for Delivery Timescales Progress
Motherwell Rail Station Transport
Hub completed 2023 and next stage
of the project focusing on improving
routes for pedestrians and cyclists in
Motherwell is underway.   
Proposed Housing Development Sites
Site/ Project Site Comments/
Constraints
Specific
Requirements/Actions
Responsibility for
Delivery
Timescales
(phasing of units
identified from draft
HLA 2024
programming)
Progress and Notes
01/07 Land at
Stirling Road 
(HLA ref: 
NLMK1150 -
Land at
Berryhill, Stand
(formerly Stirling
Road)) 
Who: Developer
Capacity: 523
Area: 51.16 Ha 
Short-term (60 units)
Medium-term (90
units)
Long-term (120
units) 
Remainder beyond
10 yrs (253) 
Planning Application
18/01785/PPP permitted.
Application for Approval of Matters
Specified in Conditions of the
above planning application
approved 22/00430/MSC. 
08/07 Dykehead
Road (Golfhill) 
(HLA Ref:
NLMK1151
Dykehead Road
(Golfhill))
Coal Authority – high
risk area/low risk
area
Flood Risk Assessment 
Strategic Network Impact
Assessment undertaken by
Scottish Water, developer
should contact to obtain
most up to date
information.  
Development Brief
Who:
Developer/NLC
Capacity: 18
Area: 0.71 Ha
Medium-term (18) No planning application 
Page 58 of 154

Page 59

25 
Site/ Project Site Comments/
Constraints
Specific
Requirements/Actions
Responsibility for
Delivery
Timescales
(phasing of units
identified from draft
HLA 2024
programming)
Progress and Notes
11/07 Easterton
Farm,
Caldercruix 
(HLA Ref:
NLMK1152
Easterton Farm) 
Coal Authority – high
risk area/low risk
area.
Local concerns raised
during consultation
regarding adverse
impact upon
residential amenity,
noise, pollution,
access and traffic
should be mitigated
via the Development
Management process.
Opportunity to
enhance existing
planting and deliver a
high quality landscape
edge at western,
southern and eastern
boundary.
Scottish Water - Pre-
Development enquiry
required to ascertain
what is required for
this site.  Growth of
the Waste Water
Treatment Works may
be required to
accommodate this site    
There is an existing
sewer running through
site that will have to
be considered when
designing the site
layout. 
Provide green corridor and
active travel opportunities
(access to NCN75) 
Ecological survey  
Transport Statement
(access from adjacent
development) 
Scottish Water: Pre-
development enquiry
required 
Flood Risk Assessment
(including strategy for
retention of small
watercourses) 
Possible Noise Assessment
Who: Developer
Capacity: 78
Area: 2.92 Ha
Medium-term (78) No planning application 
Page 59 of 154

Page 60

26 
Site/ Project Site Comments/
Constraints
Specific
Requirements/Actions
Responsibility for
Delivery
Timescales
(phasing of units
identified from draft
HLA 2024
programming)
Progress and Notes
29/07 
Roughrigg
Road,
Longriggend 
(HLA
Ref:NLMK1157
Roughrigg
Road)
Coal Authority – high
risk area
Extended Phase 1 survey
and protected species
survey required (NLC
Greenspace). 
Access statement may be
required. 
Waste Water infrastructure
required.
Provide green corridor and
active travel opportunities.
Retention/enhancement of
trees along railway line.
Who: Developer
Capacity: 19
Area: 0.75 Ha 
Medium-term (19) No planning application
01/08 North of
Leaend Road 
(HLA Ref:
NLMK1158 –
North of Leaend
Road)
Site located adjoining
Northburn Park SINC 
There is capacity at
both water and waste
water treatment
works for this site.         
This site was
included in the
Strategic study
carried out for
Daldowie and no
mitigation has been
identified. 
Flood Risk Assessment 
Provide green corridor and
active travel opportunities. 
Retain woodland to the
north and west of site. 
Ecological survey 
Development brief required 
Who:
Developer/NLC
Capacity: 41
Area: 1.62 Ha 
Medium-term (41) No planning application
Page 60 of 154

Page 61

27 
Site/ Project Site Comments/
Constraints
Specific
Requirements/Actions
Responsibility for
Delivery
Timescales
(phasing of units
identified from draft
HLA 2024
programming)
Progress and Notes
03/08  Land at
Mosside Farm 
(HLA Ref:
NLMK1159 –
Land at Mosside
Farm)
Scottish Gas
infrastructure passes
through site.
Coal Authority – high
risk area. 
There is capacity at
both water and waste
water treatment
works for this site.         
A Flow and Pressure
test will be required
to be undertaken by
the Developer for this
site.                                   
Scottish Water have
included this site in
the strategic
drainage impact
assessment, the
Developer should
contact Scottish
Water to discuss. 
Possible tree grant
conditions. 
Proposals should take into
consideration the memorial
to the mining disaster at
this location. 
Site located on SINC
(Northburn Park)
assessment required to
demonstrate no adverse
impact/ suitable mitigation.  
Ecological Survey 
Provide green corridor and
active travel opportunities. 
Transport Assessment 
Possible Noise
Assessment. 
Contact Scottish Water to
discuss strategic drainage
impact assessment.  
Flood Risk Assessment
(including strategy for
retention of watercourses).
Who: Developer
Capacity: 200
Area: 7.06 Ha 
Medium-term (90)
Long-term (110)
No planning application
Page 61 of 154

Page 62

28 
Site/ Project Site Comments/
Constraints
Specific
Requirements/Actions
Responsibility for
Delivery
Timescales
(phasing of units
identified from draft
HLA 2024
programming)
Progress and Notes
07/11 Sykeside
Road 
(HLA Ref:
NLMK1160 –
Sykeside Road) 
Site currently
operating as a waste
management facility.
The land has
physical constraints,
notably the remains
of industrial activity
and potential
contamination from
previous uses that
will require to assess
and remediate.
Coal Authority – high
risk area. 
There is capacity at
both water and waste
water treatment
works for this site.         
Please note
significant
infrastructure
including a surface
water sewer and
culvert, these must
be considered by the
Developer as this will
impact the site
layout. 
Contaminated land survey,
and if necessary site
remediation is required. 
Ecological survey. 
Site adjacent Monkland
Canal Scheduled
Monument and SINC –
development should avoid
adverse impact/suitable
mitigation.  
Scottish Water: Pre-
Development Enquiry
required (surface water
sewer and culvert running
through site which may
require diversion). 
Flood Risk Assessment. 
A former bing is located on
the site. A programme of
archaeology works is
required. 
Who: Developer
Capacity: 22
Area: 1.23 Ha 
Beyond 10 years
(22)
16/01649/PPP application refused
and appeal dismissed (residential
development in principle, with new
access and associated
infrastructure).
Area extended at Examination. 
Page 62 of 154

Page 63

29 
Site/ Project Site Comments/
Constraints
Specific
Requirements/Actions
Responsibility for
Delivery
Timescales
(phasing of units
identified from draft
HLA 2024
programming)
Progress and Notes
02/07 P 
Ryden Mains
Farm 
(HLA Ref:
NLMK1360 –
Land south of
Ryden Mains
Farm)
Coal Authority –
development high risk
area.
Possible access and
lighting issues require
to be discussed with
NLC Roads.
Surface water flood
risk and two
watercourses to the
south west of the site
have culverts
upstream that would
lie below the site,
SEPA require
buildings must not be
constructed over
existing drain that is to
remain active.
NatureScot -
Consideration to the
potential presence of
badgers, bats, otters,
water vole and also,
great crested newts if
there are any ponds
on site/within 500.
Recommend
scrub/woodland south
east of site be
retained/ improved.
Capacity at Balmore
Water Treatments
Works and Daldowie
Waste Water
Treatment Works.
Coal Mining Risk
Assessment required. 
Ground contamination site
investigation. 
Noise Assessment 
Air Quality Impact
Assessment 
Flood Risk Assessment 
Protected species surveys
(including raptors as next to
quarry). 
Consideration of retention of
hedgerows/other biodiversity
enhancements. 
Consideration of access
rights under Land Reform
(Scotland) Act 2003.
Who: Developer
Capacity: 120
Area: 4.5 Ha
Medium-term (90)
Long-term (30)
Site added at Examination. 
24/00049/EIASCR - Residential
development comprising
residential units associated
accesses and roads, car parking,
landscaping and associated
infrastructure (EIA screening
request
Page 63 of 154

Page 64

30 
Proposed Regeneration Sites
Site/ Project Site Comments/
Constraints
Specific
Requirements/Actions
Responsibility for
Delivery
Timescales Progress and Notes
04/08 
Alexander
Street
Within Victoria and
Town Centre
Conservation Area.
Development
should take South
Burn into
consideration/avoid
damage to the
waterway.
Coal Authority –
high risk area. 
Capacity available
at water and
wastewater
treatment works. 
Flood Risk Assessment 
Scottish Water: Pre-
development Enquiry
required. 
Scottish Government’s
Control of Woodland
Removal policy should
be adhered to.  
Ecological survey 
Possible Noise
Assessment.
Who: Developer 2022 - 2027 Unit 53 is split into two units. 53A is
the Wellness Hub and 53 is
operating as Puro Pizzeria.
Unit 55-57 ground floor is vacant.
Upper floor is operating as a martial
arts centre (Retail survey, March
2019). 
22/00205/FUL application permitted
for change of retail unit to class 3
restaurant with takeaway facility at
55 Alexander Street. 
Page 64 of 154

Page 65

31 
Bellshill Local Area Partnership – Area Strategies
Transport Improvements
Project/ Action Responsibility for Delivery Timescales Progress
Refer to ‘Transport Improvements’
table above under Airdrie LAP –
Area Strategy   
Proposed Housing Development Sites
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
02/14
Community
Road (East) 
(HLA Ref:
NLMW1161 –
Community
Road (East) 
Scottish Water: Pre-development
Enquiry required (existing water
main north of site may need
diverted). 
Noise Assessment 
Development brief
Who: Developer/
NLC
Capacity: 23
Area: 0.87 Ha 
Medium-term
(23)
No planning application
Page 65 of 154

Page 66

32 
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
04/14
Hattonrigg 
(HLA Ref:
NLMW1162 –
Hattonrigg) 
Who: Developer
Capacity: 75
Area: 3.01 Ha 
Short-term
(69) 
Planning permission granted -
20/01540/FUL 74 dwellinghouses. 
Site under construction (5 built). 
01/15
Bairdsland View 
(HLA
Ref:NLMW1163
– Bairdsland
View) 
Flood Risk Assessment (including
strategy for retention of water
courses). 
Scottish Water: Pre-development
Enquiry required. 
Scottish Government’s Control of
Woodland Removal policy should
be adhered to. 
Ecological survey 
Development brief
Noise Assessment
Who: Developer/
NLC
Capacity: 15
Area: 0.60 
Medium-term
(15)
No planning application. 
Scottish Water has granted
technical approval to connect. 
04/15 
Torrance Park,
Holytown 
(HLA Ref:
NLMW1164 –
Torrance Park
South West –
Barratt Phase)  
Who: Developer
Capacity: 638
Area:27.57 
Short-term
(135)
Medium-term
(34)
Minded to grant planning
permission, subject to Section 75
Agreement (Planning Application
19/00124/FUL)
21/00405/FUL permitted
amendment to 19/00124/FUL part of
residential site. 
118 units built – draft HLA 2024
capacity for site is 287 total.
Page 66 of 154

Page 67

33 
Proposed Regeneration Sites
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
02/13
Adjacent to 121
Bellshill Road,
Uddingston  
Who: Developer  Minded to grant planning
permission, subject to Section 75
Agreement (Planning Application
17/00518/PPP)
22/00325/MSC matters specified in
conditions pending consideration,
construction of 98 dwellings with
associated roadworks, SUDS and
landscaping (17/00518/PPP) 
Page 67 of 154

Page 68

34 
Coatbridge Local Area Partnership – Area Strategies
Transport Improvements
Project/ Action Responsibility for Delivery Timescales Progress and Notes
Refer to ‘Transport Improvements’
table above under Airdrie LAP –
Area Strategy   
The following sites have been identified for which joint action may be required to mitigate the cumulative effect of development - 
• 01/09 Coatbridge Road/Manse Road, Bargeddie 
• 02/09 Coatbridge Road/Langmuir Road, Bargeddie 
• 01/10 Sweethill Terrace/Deanston Place Carnbroe 
Proposed Housing Development Sites
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
01/09
Land North of
Coatbridge
Road Bargeddie 
(HLA Ref:
NLMK1184 –
Land north of
Coatbridge
Road) 
Scottish Gas – high
pressure running
through centre of
the site.
Coal Authority –
high risk area/low
risk area 
A Pre-development
enquiry has
confirmed to
customer that a
Flow and Pressure
test is required.
Additionally, a
stand-alone
Contact Scottish Water as
mitigation is required for this site.  
Transport Assessment  -
Developers should jointly seek to
assess cumulative impact of
nearby proposals and where
possible mitigate any effect of
development. 
Bargeddie Station capacity
investigation. 
Air Quality Impact Assessment 
Noise Impact Assessment
Who: Developer
Capacity: 155
Area: 6 Ha 
Medium-term
(78)
Long-term (64)
Planning permission granted -
20/00827/FUL residential
development with formation of
accesses, landscaping and
associated works. 
Draft HLA 2024 capacity for site is
142. 
Page 68 of 154

Page 69

35 
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes 
Drainage impact
assessment is
required from the
Developer as the
foul flows are to be
pumped. 
Site bounded by railway line and
motorway – provide high quality
landscaping at these areas.
02/09
Land East of
Langmuir Road,
Bargeddie 
(HLA Ref:
NLMK1185 –
Land East of
Langmuir Road)
Existing bungalows
on Coatbridge
Road utilise septic
tanks, for which the
outflow for the
majority of these
tanks is into a
culvert on the
northern edge of
the site.
Coal Authority –
low risk area. 
Contact Scottish Water as
mitigation is required for this site - 
A Pre-development enquiry has
confirmed to customer that a Water
Impact assessment is required. 
Provide green corridor and active
travel opportunities (connectivity to
NCR75 and high quality
landscaping to northern and
western edges). 
Transport Assessment (access
take off Langmuir Road and assess
roundabout and realignment at
Dykehead Road). 
Developers should jointly seek to
assess cumulative impact of
nearby proposals and where
possible mitigate any effect of
development. 
Bargeddie Station capacity
investigation. 
Air Quality Impact Assessment 
Noise Impact Assessment
Who: Developer
Capacity: 205
Area: 8.30 Ha
Beyond 10
years (205)
No planning application 
Page 69 of 154

Page 70

36 
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
03/09 
Former St
James Primary
(Lismore Drive) 
Coal Authority –
low risk area   
Who: NLC  Planning permission granted -
Planning Application 18/00834/FUL,
20/00102/AMD) 
Site complete.
06/09 
Site of Former
Drumpark
School,
Bargeddie
Local concerns
raised through
consultation
regarding
sewerage/drainage/
traffic/access/lands
caping/layout/air
quality and the
provision of
consequential
physical and social
infrastructure.
Where feasible,
address through
the Development
Management
process. 
Flood Risk Assessment (including
strategy for retention of
watercourses). 
Scottish Water -
Pre-development enquiry has been
submitted, there is existing Scottish
Water infrastructure within the site
boundary that has to be considered
when designing the site layout. 
Transport Assessment  -
Developers should jointly seek to
assess cumulative impact of
nearby proposals and where
possible mitigate any effect of
development. 
Tree Protection Order on site.
Preparation of a tree management
plan. 
Scottish Government’s Control of
Woodland Removal policy should
be adhered to. 
Ecological survey 
Bargeddie Station capacity
investigation. 
Development brief
Who: Developer/
NLC
Capacity: 55
Area: 2.18 Ha
2022 - 2027 No planning application. 
Education and Families Committee
approved a new primary school for
St Kevin’s Primary School be
provided at this location in May
2019. 
22/01110/PAN for St Kevin’s
Primary and Community Hub. 
Site no longer included in HLA due
to change in proposed land use. 
Page 70 of 154

Page 71

37 
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
01/10 Land
South of
Deanston Place,
(Carnbroe) 
(HLA Ref:
NLML1189 –
Land south of
Deanstone
Place
(Carnbroe)
Coal Authority –
high risk area/low
risk area 
Early and ongoing discussion
required with Scottish Power
Energy Network. 
Scottish Water - 
A Pre-development enquiry has
been submitted and it has been
confirmed that capacity is available
for proposed development.  
Transport - Access via Deanstone
Walk. 
Scottish Government’s Control of
Woodland Removal policy should
be adhered to.
Who: Developer
Capacity: 55
Area: 2.21 Ha
Beyond 10
years (55)
15/01799/EIASCR -
EIA Screening Opinion approved
October 2015. Residential
development c.55-58 units.
Proposed Business Development Sites
02/10
1 Carnbroe,
Coatbridge 
Flood Risk Assessment  
Strategic Network Impact
Assessment undertaken by
Scottish Water, developer to make
contact to obtain most up to date
information. 
Scottish Government’s Control of
Woodland Removal policy should
be adhered to. 
SINC North Calder Water -
development should avoid adverse
impact/suitable mitigation. 
Ecological survey 
Air Quality Impact Assessment
Noise Impact Assessment
Who: Developer  2022 - 2027 17/00571/PAN -
Proposal of Application Notice:
Proposed Class 4, 5, & 6 with
Associated Access Works,
Landscaping & SUDS Pond
21/00906/PAN - Energy Recovery
Facility 
Page 71 of 154

Page 72

38 
Cumbernauld & Kilsyth Local Area Partnership – Area Strategies
Transport Improvements
Project/ Action Responsibility for Delivery Timescales Progress and Notes
Improvements to bus and rail
infrastructure within North
Lanarkshire Council 
NLC/Strathclyde Partnership for
Transport/Network Rail 
Ongoing Ongoing discussions with SPT with
regard to setting up a Bus
Improvement Partnership along the
A89 corridor. 
General improvements to bus
infrastructure (bus shelter
maintenance contract now handled
mainly by SPT) along with the
proposed installation of Real Time
Passenger Information throughout
the network – starting with the A89. 
Park and Ride facility at Wishaw
Station extended 2019.
General road safety improvements
for route action plans and accident
improvement plans for locations
identified with high numbers of injury
accidents.
NLC/Police Scotland Ongoing Ongoing rolling programme of route
improvements based on accident
stats. 
The following sites have been identified for which joint action may be required to mitigate the cumulative effect of development - 
• 05/02 72-74 Napier Road, Cumbernauld 
• 12/02 28 Napier Road, Cumbernauld 
Page 72 of 154

Page 73

39 
Proposed Housing Development Sites
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
10/01 
Lammerknowes
Road, Banton 
(HLA Ref:
NLKS1195A
and
NLSK1195B –
Lammerknowes
Road) 
Coal Authority –
high risk area 
Flood Risk Assessment (including
strategy for retention of small
watercourses). 
Early discussion with NLC roads
officers to address access.  
North Auchinloch Marsh SINC -
development should avoid adverse
impact/suitable mitigation.  
Ecological survey 
Site is located adjacent to Special
Landscape Area - assessment of
impact may be required. 
20% affordable housing provision
required (Cumbernauld HSMA). 
Scottish Water - A Pre-
development enquiry has been
submitted and further investigation
is required for surface water
disposal. 
Who: Developer
Capacity: 57
Area: 2.28 Ha 
Medium-term
(41 & 13)
Pending consideration -
21/00665/PPP 57 dwellinghouses
pending consideration 
Draft HLA 2024 capacity 54 units. 
Page 73 of 154

Page 74

40 
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
05/02
72-74 Napier
Road 
(HLA Ref:
NLCN1196A
and
NLCN1196B –
72-74 Napier
Road) 
Scottish Gas
infrastructure within
site boundary 
Flood Risk Assessment 
Scottish Water: Pre-Development
Enquiry required (early
engagement with Scottish Water is
essential to discuss site
requirements). 
Transport Assessment -
developers should jointly seek to
assess cumulative impact of
nearby proposals and where
possible mitigate any effect of
development (consider DPMTAG
study).  
Ecological survey 
Noise Impact Assessment 
Enhanced screening to provide
good landscape edge. 
20% affordable housing provision
required (Cumbernauld HSMA).
Who: Developer
Capacity: 142
Area: 5.71 Ha 
Beyond 10
years (142)
No planning application
Page 74 of 154

Page 75

41 
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
12/02
28 Napier Road 
(HLA Ref:
NLCN1198A &
NLCN1198B –
28 Napier Road) 
Flood Risk Assessment 
Contact must be made with
Scottish Water early on in the
process to discuss existing 12”
Trunk main within site boundary,
this will impact on the site layout.
(Pre-development enquiry has
been submitted for site). 
Transport Assessment -
developers should jointly seek to
assess cumulative impact of
nearby proposals and where
possible mitigate any effect of
development (consider DPMTAG
study). 
Ecological survey 
Noise Impact Assessment 
20% affordable housing provision
required (Cumbernauld HSMA)
Development brief.
Who:
Developer/NLC
Capacity: 135
Area: 5.43 Ha
Medium-term
(117)
Long-term (18)
No planning application. 
Development Brief being prepared
for marketing. 
Page 75 of 154

Page 76

42 
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
14/02 
Tollpark Road,
Castlecary 
(HLA Ref:
NLCN1199A &
NLCN1199B –
Tollpark Road
(Castlecary)) 
Scottish Gas
infrastructure within
site boundary.
Coal Authority –
high risk area.
Tree Preservation
Order at southern
boundary of site. 
Archaeology assessment and
consultation with Historic
Environment Scotland (Antonine
Wall World Heritage Site and
associated Scheduled Monument). 
Provide green corridor and active
travel opportunities. 
Ecological survey. Opportunity for
woodland and wildlife corridor
enhancements. 
There is existing Scottish Water
infrastructure within site; contact
must be with the Asset Impact
team to discuss potential impact on
site layout. 
Consult with NLC Roads regarding
access. 
20% affordable housing provision
required (Cumbernauld HSMA). 
Noise Impact Assessment 
Scottish Water: Pre-development
has been submitted, further
investigation on the wastewater
network is required. 
Listed Building 
Development brief
Who: Developer
Capacity: 49
Area: 2 Ha
Medium-term
(49 units)
No planning application 
Page 76 of 154

Page 77

43 
Proposed Business Development Sites
03/02
Land at
Westfield
Cumbernauld
Sports pitch on site.  Flood Risk Assessment (including
consideration of Board Burn)
contact SEPA. 
Contact must be made with
Scottish Water early on in the
process to discuss existing 54”
Trunk main within site boundary,
this will likely impact on the site
layout. 
Ecological survey 
Development brief 
Possible Noise Impact Assessment
Who:
Developer/NLC
Area: 3.73 Ha
2022 - 2027 No planning application 
Proposed Regeneration Area
13/02
Orchardton
Woods 
13/02 cont.
Scottish Gas
infrastructure within
site boundary.
NATS Holdings Ltd
(formerly known as
National Air Traffic
Services) has air
traffic control
infrastructure on
site. 
Scottish Water -
54" Trunk main that
runs along West of
the site. This will
have to be
considered by the
Developer when
Flood Risk Assessment 
Scottish Water: the Developer
should submit a Pre-development
enquiry to establish site
requirements. Please note there
are existing Scottish water
infrastructure within the site
boundary that also includes a 54"
Trunk main that runs along West of
the site. This will have to be
considered by the Developer when
designing the site layout.
(continues next page) 
Who:
Developer/Scottis
h Enterprise
Area: 11 Ha
2022 - 2027 Ironside Farrar appointed to produce
Masterplan
Page 77 of 154

Page 78

44 
designing the site
layout. 
Early and ongoing discussion with
Scottish Power Energy Network
(infrastructure passes nearby). 
Tree felling application. 
FCS woodland planted under
Woodland Grant Scheme 3,
Cumbernauld Woods WIAT
Scheme (Control of Woodland
Removal Policy). 
Ecological survey 
Transport Assessment
Masterplan 
Page 78 of 154

Page 79

45 
Motherwell Local Area Partnership – Area Strategies
Transport Improvements
Project/ Action Responsibility for Delivery Timescales Progress and Notes
Refer to ‘Transport Improvements’
table above under Airdrie LAP –
Area Strategy   
Proposed Housing Development Sites
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
06/17
High Street,
Newarthill 
(HLA Ref:
NLMW1303 –
High Street)
Local concerns
raised through
consultation
regarding privacy,
traffic and drainage.
Where feasible
address through
Development
Management
process. 
Scottish Water –
existing sewer
within site boundary   
Mineral Stability Risk Assessment,
and if required remediation. 
Flood Risk Assessment 
Ecological survey 
Contaminated land survey, and if
required remediation. 
Noise Impact Assessment 
Possible Air Quality Impact
Assessment. 
Scottish Water - A Pre-
development enquiry has
confirmed water and wastewater
capacity is available but there is an
existing sewer within the site
boundary that must be considered. 
Who: Developer
Capacity: 51
Area: 2.07 Ha 
Medium-term
(49 units)
19/00416/FUL- Erection of two
detached dwellinghouses (south
east corner of site). 
23/00835/FUL permitted subject to
section 75. 
Draft HLA capacity is 49. 
Page 79 of 154

Page 80

46 
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
02/18 
Pentland Road
(Wishawhill) 
(HLA Ref:
NLMW1165 –
Pentland Road
(former St
Matthews
Primary))
Coal Authority –
high risk area/low
risk area
Early and ongoing discussion with
Scottish Power Energy Network
(infrastructure passes through site
boundary). 
Scottish Water: Pre-Development
Enquiry required - mitigation
identified to be required on the
wastewater network. 
Retain watercourse. 
Active travel link along north edge
of site. 
Consideration of Control of
Woodland Removal Policy 
Ecological survey. 
Possible Air Quality Impact
Assessment. 
Noise Impact Assessment 
Development brief
Who:
Developer/NLC
Capacity: 142
Area: 5.68 Ha 
Medium-term
(66)
Long-term (19)
No planning application 
Draft HLA 2024 capacity 85 units. 
03/18
Netherton
Street, Wishaw 
(HLA Ref:
NLMW1166 –
Netherton
Street)
Scottish Gas
infrastructure within
site. Previous gas
holder site with
active regulator. 
Scottish Water -
note there is a
culvert crossing
north west of site. 
Scottish Water: Pre-Development
Enquiry required. 
Protected Species survey 
Contaminated land survey 
Transport Assessment -
developers should jointly seek to
assess cumulative impact of
nearby proposals and where
possible mitigate any effect of
development.
Who: Developer
Capacity: 16
Area: 0.67 Ha
Medium-term
(16) 
17/00146/PRD – Permitted
Development - Prior Notification for
Demolition of Gasholder. 
Gasholder has been demolished. 
Page 80 of 154

Page 81

47 
Northern Corridor Local Area Partnership – Area Strategies
Transport Improvements
Project/ Action Responsibility for Delivery Timescales Progress and Notes
Improvements to bus and rail
infrastructure within North
Lanarkshire Council 
NLC/ Strathclyde Partnership for
Transport/Network Rail.
Ongoing Ongoing discussions with SPT with
regard to setting up a Bus
Improvement Partnership along the
A89 corridor. 
General improvements to bus
infrastructure (bus shelter
maintenance contract now handled
mainly by SPT) along with the
proposed installation of Real Time
Passenger Information throughout
the network – starting with the A89. 
Park and Ride facility at Wishaw
Station extended 2019.
General road safety improvements
for route action plans and accident
improvement plans for locations
identified with high numbers of injury
accidents.
NLC/ Police Scotland Ongoing Ongoing rolling programme of route
improvements based on accident
stats.
Glasgow City Region City Deal
Infrastructure Fund projects: 
Gartcosh/ Glenboig Community
Growth Area 
Complete Glenboig link road opened in June
2018. 
The project also delivered – 
Landscaping new ponds/restoring
areas of existing nature reserve;
improvements to Auldyards Road
within Gartcosh Business Park;
extended areas to Gartcosh Local
Nature Reserve; cycling/walking
paths either side of road;
replacement of entrance feature to
the business park.
Page 81 of 154

Page 82

48 
Proposed Housing Development Sites
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
04/05 
Lanrigg Old
Lindsaybeg
Road, Chryston 
(HLA Ref:
NLSK1191A &
NLSK1191B –
Lanrigg Old
Lindsaybegg
Road) 
Scottish Water -
Please note there is
existing Scottish
Water infrastructure
within the site
boundary that will
have to be
considered by the
Developer. 
Flood Risk Assessment (including
strategy for retention of
watercourses). 
Contact Scottish Water as
mitigation on the water network is
required for this site. 
Transport assessment – contact
NLC Roads regarding access.  
Ecological survey and opportunity
for habitat and wildlife corridor
enhancements. 
20% affordable housing provision
required (Cumbernauld HSMA).
Who: Developer
Capacity: 34
Area: 1.36 Ha 
Beyond 10
years (34)
No planning application.
10/05 
Gartferry Road,
Moodiesburn
56” strategic trunk
main runs through
the site – critical
asset which would
have a significant
impact on future
development. 
Who: Developer  Site not part of
the draft HLA
2024 
Page 82 of 154

Page 83

49 
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
18/05 
The Neuk,
Auchinloch 
(HLA Ref:
NLSK1193A
The Neuk)
TPO at west side of
boundary 
Scottish Water -
existing 56"
strategic trunk main
running through
site.
Flood Risk Assessment (including
strategy for retention of small
watercourses). 
Scottish Water: Pre-Development
Enquiry required. Early contact with
Scottish Water is essential to
discuss existing 56" strategic trunk
main running through site. This is a
critical asset and will impact the
proposed site. 
Ecological survey. Water vole
present on site.
Access off adjacent development
and replicate existing road design
(contact NLC Roads). 
Possible Noise Impact Assessment
20% affordable housing provision
required (Cumbernauld HSMA).
Who: Developer
Capacity: 23
Area: 0.91 Ha
Short-term (7
units)
Pending consideration -
21/01553/FUL residential
development of 7no. detached
dwellings with detached garage. 
Draft HLA 2024 capacity 7 units. 
29/05 
East of
Auchengeich
Road,
Moodiesburn 
(HLA Ref:
NLSK1194A &
NLSK 1194B
East of
Auchengeich
Road) 
Flood Risk Assessment (including
strategy for retention of small
watercourses). 
Contact Scottish Water as mitigation
on the water network is required for
this site. 
Ecological survey 
Opportunity for habitat and wildlife
enhancements. 
Masterplan to include Stoneyetts
Hospital site and adjacent 29/05
proposed housing site. 
Air Quality Impact Assessment (near
AQMA).
Who: Developer
Capacity: 105
Area: 3.54 Ha
Short-term (47
units
remaining of
112)
Planning Permission granted -
20/01338/FUL 112 dwellings. 
Proposal of Application Notice
19/01623/PAN – residential
development with associated
access, landscaping an ancillary
works. 
Scottish Water's technical approval
has been granted for site. 
Draft HLA capacity total 112 units of
which 65 complete. 
Page 83 of 154

Page 84

50 
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes 
Noise Impact Assessment
20% affordable housing provision
required (Cumbernauld HSMA). 
Page 84 of 154

Page 85

51 
Wishaw Corridor Local Area Partnership – Area Strategies
Transport Improvements
Project/ Action Responsibility for Delivery Timescales Progress and Notes
Improvements to bus and rail
infrastructure within North
Lanarkshire Council 
NLC/Strathclyde Partnership for
Transport/Network Rail 
Ongoing Ongoing discussions with SPT with
regard to setting up a Bus
Improvement Partnership along the
A89 corridor. 
General improvements to bus
infrastructure (bus shelter
maintenance contract now handled
mainly by SPT) along with the
proposed installation of Real Time
Passenger Information throughout
the network – starting with the A89. 
Park and Ride facility at Wishaw
Station extended 2019.
General road safety improvements
for route action plans and accident
improvement plans for locations
identified with high numbers of injury
accidents.
NLC/Police Scotland Ongoing Ongoing rolling programme of route
improvements based on accident
stats. 
The following sites have been identified for which joint action may be required to mitigate the cumulative effect of development – 
• 03/18 Netherton Street, Wishaw (shown on Motherwell Local Area Partnership – Area Strategy table)
• 13/19 Woodhall Road, Newmains, Wishaw 
• 17/19 Royal George, Newmains
• 20/19 West of Morningside, Newmains
• 02/20 Overtown Road, Waterloo
• 13/20 Gowkthrapple near Priory Lodge, Wishaw
• 07/20 Garrion Farm, Overtown
• 11/20 No 1 Netherton Road, Wishaw
Page 85 of 154

Page 86

52 
• 12/20 No 4 Netherton Road, Wishaw 
Proposed Housing Development Sites
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
05/12 
East of Benhar
Road (The Voe)
Shotts 
(HLA Ref:
NLMW1167
East of Benhar
Road (The
Voe))
Coal Authority –
high risk area/low
risk area
Flood Risk Assessment (including
strategy for retention of
watercourses and pond) area
overlaps into The Voe SINC. 
Scottish Water - 
Shotts Wastewater treatment
works will require a growth project
for the proposed development.
Drainage Impact assessment
required. 
Scottish Government’s Control of
Woodland Removal policy should
be adhered to (Woodland present
on site). 
Ecological survey 
Transport assessment 
Air Quality Impact Assessment 
Noise Impact Assessment
Who: Developer
Capacity: 200
Area: 34.81 Ha 
Beyond 10
years (200
units)
No planning application.
Page 86 of 154

Page 87

53 
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
14/12 
Springhill Farm,
Shotts 
(HLA Ref:
NLMW1168
Springhill Farm) 
A Strategic drainage impact
assessment is required to
determine if mitigation is required
for this site. A study is underway,
developer should liaise with
Scottish Water for updates.
Who: Developer
Capacity: 45 
Area: 1.81 Ha 
Beyond 10
years (45)
Planning permission granted -
Planning Application 17/00389/PPP
20/00235/MSC Masterplan and
Phasing of Development. 
Application covering matters
specified by conditions of Planning
Permission in Principle
17/00389/PPP.
04/19 
West of 499
Wishaw Road,
Bogside 
(HLA Ref:
NLMW1169
West of 499
Wishaw Road) 
Pre-Development Enquiry to
Scottish Water. 
Access statement (if direct access
is alternate to Wishaw Road). 
Possible Noise Impact
Assessment.
Who: Developer
Capacity: 4
Area: 0.16 Ha
Short-term (2
units)
Beyond 10
years (2 units)
22/01220/PPP 
09/19
18a Biggar
Road, Cleland 
(HLA Ref:
NLMW1170 18a
Biggar Road)
Coal Authority –
high risk area/low
risk area 
Scottish Water –
existing sewer
running through
site.
Drainage impact assessment.
Swinstie WWTW has limited
capacity and a growth project may
be required. Pre Development
Enquiry to Scottish Water. 
Transport statement 
Consider quality of pedestrian and
cycle links to station and adjoining
areas. 
Possible Noise Impact
Assessment.
Who: Developer
Capacity: 17
Area: 0.75 Ha
Medium-term
(17 units)
No planning application 
Page 87 of 154

Page 88

54 
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
13/19
Woodhall Road,
(Victoria Park)
Newmains 
(HLA Ref:
NLMW1171
Woodhall Road
(Victoria Park)
Scottish Gas
infrastructure
passes through part
of the site.
Coal Authority –
high risk area/low
risk area.
Local concerns
raised through
consultation
regarding the
natural
environment, site
location and
suitability. Where
feasible address
through
Development
Management
process.   
Scottish Water: Pre-Development
Enquiry required. Swinstie WWTW
may require a growth project. Flow
and pressure test required (see
‘Progress and Notes’ column). 
SNH: Incorporate woodland and
enhance connectivity between and
out with site. 
Ecological survey 
Transport assessment – 
developers should jointly seek to
assess cumulative impact of
nearby proposals and where
possible mitigate any effect of
development. 
Possible Noise Impact Assessment
Who: Developer
Capacity: 207
Area: 9.28 Ha
Medium-term
(90 units)
Long-term
(105 units)
22/01285/EIASCR, 23/00367/FUL 
Draft HLA capacity 195 units 
Scottish Water - A Pre-development
has been submitted and it has been
advised that there is capacity at the
water and wastewater treatment
works for this development.
Developer is required to carry out a
Flow and Pressure test and a
Strategic drainage impact
assessment has been carried out. 
Page 88 of 154

Page 89

55 
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
17/19
Royal George,
Newmains 
(HLA Ref:
NLMW1172
Royal George)
Coal Authority –
high risk area/low
risk area. 
Flood Risk Assessment (including
strategy for retention of small
watercourses and ponds at site). 
Hot Water Pond SINC overlaps
part of site. 
Ecological survey 
Scottish Water would require
further investigation to determine
impact on existing network and
best point of connection. 
Early and ongoing discussion with
Scottish Power Energy Network
(infrastructure passes through site
boundary). 
Transport assessment – 
Developers should jointly seek to
assess cumulative impact of
nearby proposals and where
possible mitigate any effect of
development. 
Possible Air Quality Impact 
Assessment. 
Noise Impact Assessment
Who: Developer
Capacity: 200
Area: 19.03
Beyond 10
years (200
units) 
15/01637/PPP – Refused – Appeal
Dismissed
Business and Industrial
Development (Use Classes 4, 5 and
6) (In Principle) - Hydracrat Ltd
20/19 West of
Morningside,
Newmains
(HLA Ref:
NLMW1173
West of
Morningside
Road)
Coal Authority –
high risk area/low
risk area. 
Scottish Water - 
Pre-development enquiry required
to be submitted from Developer to
ascertain site requirements. 
Who: Developer
Capacity: 160
Area: 13.87 Ha
Medium-term
(90units) 
Long-term (70
units)
18/00580/PPP residential
development granted on appeal 
23/00649/S42 
Page 89 of 154

Page 90

56 
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
22/19 
West of North &
South Road,
(Bellside)
Cleland 
(HLA Ref:
NLMW1174
West of North
and South Road
(Bellside)) 
Planning
permission on
northern part of
site. 
Coal Authority –
high risk area/low
risk area. 
Scottish Water –
18” Trunk Main
running through
site.
Scottish Water: 
Water and wastewater treatment
capacity available, there is a 18"
Trunk main running through site,
contact with Scottish Water is
essential to discuss as this will
impact the proposed site. 
Transport assessment or sensitivity
tests considering other nearby
development proposals. 
Impact on Cleland Station
depending on proposals/capacity.  
Possible Air Quality Impact
Assessment. 
Noise Impact Assessment 
Transport assessment – 
Developers should jointly seek to
assess cumulative impact of
nearby proposals and where
possible mitigate any effect of
development. 
Development brief
Who: Developer
Capacity: 39
Area: 1.54 Ha
Medium-term
(39 units)
16/02002/AMD (Planning application
relates to the housing development
north of this site that overlaps the
northern portion of this site).
Amendment to Planning Permission
09/01014/AMD to change house
types on plots 4, 5 and 27, and to
obtain approval of site contours and
levels. 
Page 90 of 154

Page 91

57 
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
26/19 
East of North &
South Road,
(Bellside)
Cleland 
(HLA Ref:
NLMW1177
East of North
and South Road
(Bellside))
Coal Authority –
high risk area/low
risk area. 
Scottish Water -
Capacity available,
site runs next to 18"
Trunk main. 
Flood Risk Assessment (including
strategy for retention of small
watercourses). 
Scottish Water: Pre-Development
Enquiry required. 
Ecological survey. 
South Calder Water: Murdostoun
Estate SINC overlaps western
boundary. 
Transport assessment or sensitivity
tests considering other nearby
development proposals. 
Impact on Cleland Station 
depending on proposals/capacity. 
Who: Developer
Capacity: 10
Area: 1.32 Ha
Short-term (3
units)
Beyond 10
years (7 units)
Applications permitted for single
dwellings –
23/00777/FUL
22/00077/FUL
22/00046/FUL
20/01233/FUL
20/01229/FUL
21/01017/FUL
20/01224/FUL
01/20  Excelsior
Street, Wishaw 
(HLA Ref:
NLMW1178
Excelsior Street)
Coal Authority –
high risk area/low
risk area.
Scottish Water -
existing Scottish
Water sewers
within the site
boundary that must
be considered
when designing the
site layout. 
Scottish Water: Pre-Development
Enquiry required. 
Transport statement 
Noise Impact Assessment
Who: Developer
Capacity: 15
Area: 0.61 Ha
Medium-term
(15 units)
No planning application 
Page 91 of 154

Page 92

58 
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
02/20  Overtown
Road, Waterloo 
(HLA Ref:
NLMW1250
Overtown Road
Waterloo) 
Coal Authority –
high risk area/low
risk area. 
Flood Risk Assessment (including
strategy for retention of
watercourses). 
Scottish Water: Pre-Development
Enquiry required and network impact
assessment. 
Transport assessment – 
Developers should jointly seek to
assess cumulative impact of nearby
proposals and where possible
mitigate any effect of development. 
Noise Impact Assessment 
Development brief
Who:
Developer/NLC
Capacity: 40
Area: 1.61 Ha 
Medium-term
(40 units)
No planning application
07/20 Garrion
Farm (North)
Overtown 
(HLA Ref:
NLMW0791
Garrion Farm)
Scottish Gas
infrastructure
passes partly
through site.
Coal Authority –
high risk area/low
risk area. 
Flood Risk Assessment (including
retention of small watercourses). 
Scottish Water - Pre-development
enquiry has been submitted,
sufficient capacity for water and
wastewater has been confirmed.
Further investigation is required on
the wastewater network to
determine if mitigation is required. 
Pre-app discussion with SEPA
regarding private sewer treatment on
site. 
Site is located within a Special
Landscape Area - assessment of
impact required. 
Site adjacent to Garrion Gill &
Horsely Brae SINC. 
Ecological survey
Who: Developer
Capacity: 98
Area: 3.92 Ha
Medium-term
(105 units) 
Long-term (45
units)
21/01258/PPP residential
development permitted 
Draft HLA 2024 capacity 150 units
Page 92 of 154

Page 93

59 
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes 
Transport assessment – 
developers should jointly seek to
assess cumulative impact of nearby
proposals and where possible
mitigate any effect of development.
11/20 
Netherton Road
(South) Wishaw 
Scottish Gas
infrastructure
passes through site 
Seek to retain trees at northern
edge of site boundary within site
design. 
Early and ongoing discussion with
Scottish Power Energy Network
(infrastructure passes nearby). 
Scottish Water: Pre-Development
Enquiry required and network
impact assessment. 
Transport assessment – 
Developers should jointly seek to
assess cumulative impact of
nearby proposals and where
possible mitigate any effect of
development. 
Wishaw Station capacity
investigation. 
Protected species survey.
Who: Developer
Capacity: 167
Area: 4.02 Ha
Site not part of
the draft HLA
2024 
No planning application 
Page 93 of 154

Page 94

60 
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
12/20 
Netherton Street
(North) Wishaw 
Seek to retain trees at southern
boundary within site design. 
Noise impact assessment 
Early and ongoing discussion with
Scottish Power Energy Network
(infrastructure passes nearby site)
Scottish Water: Pre-Development
Enquiry required and network
impact assessment. 
Transport assessment – 
developers should jointly seek to
assess cumulative impact of
nearby proposals and where
possible mitigate any effect of
development. 
Wishaw Station capacity
investigation. 
Protected species survey.
Who: Developer
Capacity: 63
Area: 2.54 Ha
Site not part of
the draft HLA
2024
21/01818/FUL two storage buildings
permitted
Page 94 of 154

Page 95

61 
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
13/20 
Land at Priory
Lodge
(Gowkthrapple)
Wishaw 
(HLA Ref:
NLMW1183
Land at Prioiry
Lodge
(Gowkthrapple)) 
Scottish Gas
infrastructure within
boundary 
Scottish Water -
22" strategic trunk
main running
through the site,
additonally there is
a foul sewer
through the site.
This will
significantly impact
the site layout.
Flood Risk Assessment (including
strategy for retention of small
watercourses). 
Scottish Water: Pre-Development
Enquiry required and network
impact assessment.
Early contact with Scottish Water is
essential as there is a 22" strategic
trunk main running through the site,
additionally there is a foul sewer
through the site. This will
significantly impact the site layout. 
Early and ongoing discussion with
Scottish Power Energy Network. 
Ecological survey 
Cambusnethan Woods SINC
surrounds site and existing
woodland (allocated TPO) offers
potential for links to wider
countryside and strong landscape
framework to deliver a high quality
development. 
Transport assessment – 
developers should jointly seek to
assess cumulative impact of
nearby proposals and where
possible mitigate any effect of
development. 
Wishaw Station capacity
investigation. 
Who: Developer
Capacity: 50
Area: 1.79 Ha
Medium-term
(50 units)
No planning application
Page 95 of 154

Page 96

62 
Site/ Project Site Comments/
Constraints
Specific Requirements/Actions Responsibility
for Delivery
Timescales Progress and Notes
Any development proposals should
take into consideration the adjacent
kennels in terms of impact. 
Page 96 of 154

Page 97

63 
Proposed Leisure Development Sites
03/19
Dalziel Park
Hotel, Cleland 
Scottish Water: Pre-Development
Enquiry required and network impact
assessment. 
Scottish Government’s Control of
Woodland Removal policy should be
adhered to (woodland present on
site).
TPO on site. 
Ecological survey 
Possible Noise Impact Assessment.
Who: Developer
Area: 0.30 Ha
2022 - 2027 No planning application 
Proposed Regeneration Sites
07/19
Morningside
Road,
Newmains
Coal Authority –
high risk area/low
risk area
Flood Risk Assessment (including
strategy for retention of
watercourses). 
Scottish Water: Pre-Development
Enquiry required. Swinstie WWTW
may require a growth project. 
Scottish Government’s Control of
Woodland Removal policy should be
adhered to (woodland present on
site). 
Ecological survey 
Transport statement – depending on
proposal, developers should jointly
seek to assess cumulative impact of
nearby proposals and where possible
mitigate any effect of development. 
Noise Impact Assessment
Who: Developer
Area: 2.77 Ha
2022 - 2027 No planning application 
Page 97 of 154

Page 98

64 
Section 3: Supplementary Guidance 
The table below outlines where the Local Development Plan has indicated that new or updated supporting Supplementary Planning
Guidance is required/actioned in association with specific policies. 
Local Development
Plan Policies 
Status/Action  Responsibility Timescale
PROM ID2 Utilities
Improvements Renewable
Energy
SPG 12 Wind turbine developments
Guidance to be updated to include all
renewables.
NLC in conjunction with
relevant Key Agencies
2022 onwards
PROT A Natural
Environment and Green
Network Assets
A1 International
(Designated by
NatureScot)
Associated Planning Guidance 20
Biodiversity and Development to be
updated.
NLC in conjunction with
relevant Key Agencies 
2022 onwards
PROT C Mineral
Resources
Associated SPG 11 Minerals to be
updated to include all identified Mineral
Resources
NLC in conjunction with
relevant Key Agencies
2022 onwards
1A Strategic Town
Centres
PP 1A Purpose of Place
Policy
Town Action Plans have been prepared
for Airdrie, Bellshill, Kilsyth, Motherwell,
Wishaw and Shotts. 
The Town Action Plan for Coatbridge will
be delivered through the ‘Long Term Plan
for Coatbridge’ which follows a template
required by the UK Government to enable
access to £19.5m Levelling Up Funding. 
A masterplan is currently being developed
for Cumbernauld which will involve large-
scale regeneration. The town centre was
acquired by the council in June 2023. 
NLC in conjunction with
relevant Key Agencies
Ongoing
1B Other Town Centres
PP 1B Purpose of Place
Policy
Town Centre Action Plans to be updated
as appropriate. 
NLC in conjunction with
relevant Key Agencies
To be updated
following
preparation of
Page 98 of 154

Page 99

65 
Town Centre
Visions -
2022 onwards
CI Contributions to
Infrastructure Policy
Category CI1 Affordable
Housing
Category CI2 Education
Category CI3 Transport
Category CI4 Green
Infrastructure, Amenity
Space and Play 
Affordable Housing Supplementary
Guidance was adopted in 2023. 
Education Supplementary Guidance is
currently being drafted. 
Supplementary Planning Guidance will be
prepared to set out the framework of the
application of the Policy, identification of
need, calculation of contributions and
methods of collection and management of
funds.
NLC 
NLC
2022 onwards
EDQ 1 Site Appraisal
Policy
Associated SPG 15 Good Design Toolkit
will require to be updated.
NLC 2022 onwards
EDQ 2 Specific Features
for Consideration Policy
Noise Management Areas
Planning and Noise Supplementary
Guidance was adopted in 2023.  
NLC Complete
EDQ 3 POLICY Quality of
Development
Associated
SPG 15 Good design toolkit,
SPG 01 Landscaping,
SPG 01A Landscaping supplement
SPG 02 Trees and development,
SPG 07 Green belt,
SPG 17 Accessibility for all,
SPG17 Accessibility appendix,
Existing advice on open space and play
area standards, minimum standards for
space around houses, minimum parking
standards will require to be updated.
NLC in conjunction with
relevant Key Agencies
2022 onwards 
Page 99 of 154

Page 100

Appendix 1: Draft Housing Land Audit 2024 (North Lanarkshire)  
Reference     
Site Name  
Location
HMSA
Site Area
Tenure
Private Tenure
Social Rent Provider
Intermediate
Tenure
AHP    
Landowner/Developer 
Planning Status
Consent     
Application reference
Capacity
2023-24 completions
Total Complete
Remainder/ Established
Supply
2024-25 (Short)
2025-26 (Short)
2026-27 (Short)
2027-28 (Medium)
2028-29 (Medium)
2029-30 (Medium)
2030-31 (Long)
2031-32 (Long)
2032-33 (Long)
2033-34 (Long)
Total 10 year
Beyond 10 year
NLMW1075 106 Leslie Street Motherwell MW 0.13 SR  RSL   Clyde Valley Housing
Association
COMM DETL 12/01117/FUL,
19/01620/FUL,
23/01126/S42
13 0 0 13 13 0 0 0 0 0 0 0 0 0 13 0
NLMK1313 1-13 Bank Street Coatbridge AC 0.18 SR  LA   North Lanarkshire Council CONS DETL 19/01080/PREAPE,
19/01711/FUL,
19/01709/CAC,
19/01710/LBC,
24/0699/FUL, 24/00698/LBC
6 0 0 6 0 0 6 0 0 0 0 0 0 0 6 0
NLMW0559 137-139 Craigneuk
Street
Wishaw MW 0.84 SR  RSL   Trust HA ALPS LAPD 13/00452/AMD,
16/00748/PPP
43 0 0 43 0 0 0 43 0 0 0 0 0 0 43 0
NLMW1311 16 Holytown Road Holytown MW 1.45 PRIV OO    Mr Thomas McInally ALPS LAPD 19/00878/PPP 14 0 0 14 0 0 0 0 0 0 0 0 0 0 0 14
NLMW0746 164 Morningside
Road
Newmains MW 0.18 PRIV OO    Mr D & Miss N Townsley ALPS LAPD 16/00540/FUL,
18/01658/FUL
4 0 0 4 0 0 0 0 0 0 0 0 0 0 0 4
NLMK1154 178-182 Main Street Plains AC 0.23 PRIV OO    Network Rail CONS DETL 17/00844/PPP,
22/00133/FUL
4 0 0 4 0 2 0 0 0 0 0 0 0 0 2 2
NLMW1170 18a Biggar Road Cleland MW 0.75 PRIV OO    Holder Planning for
Robert Hill
ALPS   17 0 0 17 0 0 0 17 0 0 0 0 0 0 17 0
NLMW1372 190 - 196 Alexander
Street
Wishaw MW 0.23 PRIV OO    WB Properties Scotland
Ltd
CONS DETL 22/01486/FUL 10 0 0 10 0 0 5 5 0 0 0 0 0 0 10 0
NLMW0371 23 Edinburgh Road Harthill MW 0.73 PRIV OO    Aspire Holdings Ltd/ Mr
Malcolm Gray
CONS DETL 20/00089/PPP,
23/00732/MSC
16 0 0 16 0 0 16 0 0 0 0 0 0 0 16 0
NLCN1198A 28 Napier Road Cumbernauld CN 5.43 PRIV OO    North Lanarkshire Council ALPS   108 0 0 108 0 0 0 30 30 30 18 0 0 0 108 0
NLCN1198B 28 Napier Road Cumbernauld CN 5.43 SR  LA   North Lanarkshire Council ALPS   27 0 0 27 0 0 0 27 0 0 0 0 0 0 27 0
NLMW1371 313 Main Street Bellshill MW 0.20 PRIV OO    Parks of Hamilton
(Holding) Ltd
CONS DETL 21/00926/FUL 14 0 0 14 0 0 14 0 0 0 0 0 0 0 14 0
NLCN1196A 72-74 Napier Road Cumbernauld CN 5.71 PRIV OO    McGough Planning for Ashtenne
Industrial Fund 
ALPS   114 0 0 114 0 0 0 0 0 0 0 0 0 0 0 114
NLCN1196B 72-74 Napier Road Cumbernauld CN 5.71 SR  RSL   McGough Planning for Ashtenne
Industrial Fund 
ALPS   28 0 0 28 0 0 0 0 0 0 0 0 0 0 0 28
NLMW1285 Abernethyn Road Newmains MW 2.49 SR  RSL   Places for People HA CONS DETL 22/00305/FUL 72 0 0 72 0 35 37 0 0 0 0 0 0 0 72 0
NLSK1102A Avenuehead Road Moodiesburn CN 52.86 PRIV OO    Iris Strategic Land Fund Ltd CONS DETL 12/00959/PPP,
16/00663/MSC,
18/00800/MSC,
18/00805/MSC,
23/00338/AMD
540 0 0 540 0 0 36 36 36 36 36 36 36 36 288 252
NLSK1102B Avenuehead Road Moodiesburn CN 52.85 SR  RSL   Iris Strategic Land Fund Ltd CONS DETL 12/00959/PPP,16/00663/MSC,
18/00804/MSC,23/00338/AMD
40 0 0 40 0 0 0 40 0 0 0 0 0 0 40 0
NLMW1163 Bairdsland View Bellshill MW 0.60 PRIV OO    North Lanarkshire Council ALPS   15 0 0 15 0 0 0 15 0 0 0 0 0 0 15 0
NLMW1069 Barons Road Motherwell MW 0.11 PRIV OO    Stuart Services Scotland Ltd ALPS LAPD 12/00505/FUL,16/01885/FUL,
19/01075/FUL
8 0 0 8 0 0 0 0 0 0 0 0 0 0 0 8
Page 100 of 154

Page 101

67 
Reference     
Site Name  
Location
HMSA
Site Area
Tenure
Private Tenure
Social Rent Provider
Intermediate
Tenure
AHP    
Landowner/Developer 
Planning Status
Consent     
Application reference
Capacity
2023-24 completions
Total Complete
Remainder/ Established Supply
2024-25 (Short)
2025-26 (Short)
2026-27 (Short)
2027-28 (Medium)
2028-29 (Medium)
2029-30 (Medium)
2030-31 (Long)
2031-32 (Long)
2032-33 (Long)
2033-34 (Long)
Total 10 year
Beyond 10 year
NLSK1275 Bellaville Grove Chryston CN 0.82 SR  RSL   Clyde Valley HA ALPS  18/01580/FUL 24 0 0 24 0 0 0 0 0 24 0 0 0 0 24 0
NLMW0790 Caledonian Farm Wishaw MW 4.21 PRIV OO     ALPS   106 0 0 106 0 0 0 0 0 0 0 0 0 0 0 106
NLMW0801 Caledonian Road (incl.
Wishaw Methodist Church)
Wishaw MW 0.22 PRIV OO    North Lanarkshire
Council
CONS DETL 09/00315/FUL,
23/00361/FUL
15 0 0 15 0 0 15 0 0 0 0 0 0 0 15 0
NLMW1179 Castlehill/Wemysshill Farm -
East
Wishaw MW 41.38 PRIV OO    Persimmon Homes. Mr
WD & RT Hill
CONS DETL 15/01634/PPP,
22/00296/MSC
401 0 0 401 24 38 40 40 40 40 40 40 40 40 382 19
NLMW1356 Castlehill/Wemysshill Farm -
West
Wishaw MW 28.06 PRIV OO    Mr WD & RT Hill,
Persimmon Homes Ltd
CONS DETL 15/01634/PPP,
20/01468/S42,
22/00297/FUL,
22/00295/MSC
200 0 0 200 0 0 30 30 30 30 30 30 20 0 200 0
NLMW0764 Clydesdale Works New Stevensto MW 26.72 PRIV OO    Miller Homes ALPS LAPD 10/00569/MSC,
22/00267/PAN,
24/00176/PAN
446 0 0 446 0 0 0 50 50 50 50 50 50 50 350 96
NLMK0556 Columba High School Site Coatbridge AC 3.77 SR  LA   North Lanarkshire
Council
CONS DETL 19/01255/PAN,
22/01082/PAN,
22/01479/FUL
127 0 0 127 0 0 82 45 0 0 0 0 0 0 127 0
NLMW1161 Community Road (East) Bellshill MW 0.87 PRIV OO    NLC ALPS   23 0 0 23 0 0 0 23 0 0 0 0 0 0 23 0
NLSK1358 Coshneuk Road Stepps CN 0.5 SR  LA   North Lanarkshire
Council
PROP  23/00723/PREAPP 16 0 0 16 0 0 16 0 0 0 0 0 0 0 16 0
NLMW0235 Craigneuk - Ritchie Street Motherwell MW 0.58 PRIV OO    NLC ALPS   30 0 0 30 0 0 0 0 0 0 0 0 0 0 0 30
NLCN0488A Croy Quarry Croy CN 1.82 PRIV OO    Avant Homes COMM DETL 21/01548/FUL 62 0 0 62 8 30 24 0 0 0 0 0 0 0 62 0
NLCN0488B Croy Quarry Croy CN 1.82 SR  RSL  AHP Miller Homes, Wheatley
Group
COMM DETL 20/01522/EIASCR,
21/01548/FUL
15 0 0 15 0 15 0 0 0 0 0 0 0 0 15 0
NLCN0490B1 Cumbernauld CGA (Mid-
Forrest- Bellway)
Cumbernauld CN 20.72 PRIV OO    Bellway Homes Limited
(Scotland)
CONS OUTL 16/00698/PPP,
22/01051/MSC
225 0 0 225 10 39 48 54 60 14 0 0 0 0 225 0
NLCN0490B2 Cumbernauld CGA (Mid-
Forrest- Bellway)
Cumbernauld CN 20.72 SR  LA  AHP North Lanarkshire
Council
CONS OUTL 16/00698/PPP,
22/01051/MSC
75 0 0 75 0 0 30 30 15 0 0 0 0 0 75 0
NLCN1335A Cumbernauld CGA (Mid-
Forrest- NLC)
Cumbernauld CN 39.63 PRIV OO    North Lanarkshire
Council
ALPS LAPD 16/00698/PPP 225 0 0 225 0 0 0 36 36 36 36 36 36 9 225 0
NLCN1335B Cumbernauld CGA (Mid-
Forrest- NLC)
Cumbernauld CN 39.63 SR  LA  AHP North Lanarkshire
Council
ALPS LAPD 16/00698/PPP 75 0 0 75 0 0 0 0 50 25 0 0 0 0 75 0
NLCN1333A Cumbernauld CGA (Palacerigg
TW)
Cumbernauld CN 7.16 PRIV OO    Taylor Wimpey ALPS  24/00230/PPP 117 0 0 117 0 0 0 0 0 0 0 9 36 72 117 0
NLCN0490A1 Cumbernauld CGA
(Palacerigg)
Cumbernauld CN 40.31 PRIV OO    North Lanarkshire
Council
ALPS  24/00230/PPP 489 0 0 489 0 0 0 18 45 90 135 108 78 15 489 0
NLCN0490A2 Cumbernauld CGA
(Palacerigg)
Cumbernauld CN 40.31 SR  LA  AHP North Lanarkshire
Council
ALPS  24/00230/PPP 161 0 0 161 0 0 0 6 15 30 44 36 26 4 161 0
Page 101 of 154

Page 102

68 
Reference     
Site Name  
Location
HMSA
Site Area
Tenure
Private Tenure
Social Rent
Provider
Intermediate
Tenure
AHP    
Landowner/Devel
oper 
Planning Status
Consent    
Application
reference
Capacity
2023-24
completions
Total Complete
Remainder/
Established
2024-25 (Short)
2025-26 (Short)
2026-27 (Short)
2027-28
(Medium)
2028-29
(Medium)
2029-30
(Medium)
2030-31 (Long)
2031-32 (Long)
2032-33 (Long)
2033-34 (Long)
Total 10 year
Beyond 10 year
NLCN1334A Cumbernauld CGA
(Palacerigg)
Cumbernauld CN 33.46 PRIV OO    North Lanarkshire
Council
ALPS  24/00230/PPP 360 0 0 360 0 0 0 0 0 0 0 0 0 0 0 360
NLCN1334B Cumbernauld CGA
(Palacerigg)
Cumbernauld CN 33.46 SR  LA  AHP North Lanarkshire
Council
ALPS  24/00230/PPP 119 0 0 119 0 0 0 0 0 0 0 0 0 0 0 119
NLCN1333B Cumbernauld CGA (Palacerigg
TW)
Cumbernauld CN 7.16 SR  RSL  AHP Taylor Wimpey ALPS  24/00230/PPP 39 0 0 39 0 0 0 0 0 0 0 3 12 24 39 0
NLMW1293 Dalzell Drive (former Garage
Windmillhill Street)
Motherwell MW 1.90 SR  LA   North Lanarkshire
Council
PROP   24 0 0 24 0 0 24 0 0 0 0 0 0 0 24 0
NLCN1119 Drumglass Steadings Croy CN 0.59 PRIV OO    Drumglass Builders COMM OUTL 14/01176/PPP,
15/01139/FUL,
18/00235/MSC,
18/00283/FUL,
21/00614/FUL
4 0 3 1 1 0 0 0 0 0 0 0 0 0 1 0
NLMK1364 Dunbeth, Phase 1 (Jackson
Court)
Coatbridge AC 0.84 SR  LA   North Lanarkshire
Council
PROP  24/00655/PREMAJ 56 0 0 56 0 0 0 56 0 0 0 0 0 0 56 0
NLMK1365 Dunbeth, Phase 2 (High Coats
and Dunbeth Court)
Coatbridge AC 3.91 SR  LA   North Lanarkshire
Council
PROP   114 0 0 114 0 0 0 0 114 0 0 0 0 0 114 0
NLMK0518 Dundyvan Parish Church Coatbridge AC 0.36 PRIV OO    Neatearth Ltd CONS DETL 19/01397/LBC,
19/01396/FUL,
23/00956/LBC,
23/00865/S42
44 0 0 44 0 0 44 0 0 0 0 0 0 0 44 0
NLMK1151 Dykehead Road (Golfhill) Airdrie AC 0.71 PRIV OO    NLC ALPS   18 0 0 18 0 0 0 18 0 0 0 0 0 0 18 0
NLMW1222 East Avenue Carfin MW 0.42 SR  RSL   CVHA/ Modern Housing
New Homes Ltd
PROP  22/00388/FUL 24 0 0 24 0 0 0 0 0 24 0 0 0 0 24 0
NLMK1156A East of 28 Airdriehill Street Airdrie AC 2.64 PRIV OO    North Lanarkshire
Council
CONS OUTL 16/00333/PPP,
17/00325/AMD,
22/00524/PREAPP,
23/00535/FUL
65 0 0 65 0 32 33 0 0 0 0 0 0 0 65 0
NLSK1194A East of Auchengeich Road Moodiesburn CN 3.54 PRIV OO    Bellway Homes, GVA
James Barr for Allanvale
Land Investments Ltd
COMM DETL 20/01338/FUL 100 53 53 47 47 0 0 0 0 0 0 0 0 0 47 0
NLMW1167 East of Benhar Road (The
Voe)
Shotts MW 34.81 PRIV OO    Graeme Massie
Architects for Hazeldene
Homes Shotts Ltd
ALPS   200 0 0 200 0 0 0 0 0 0 0 0 0 0 0 200
NLMW0717 East of Main Street Newmains MW 16.14 PRIV OO    Bellway Homes CONS DETL 04/02238/OUT,
17/01248/PPP,
21/00335/FUL,
22/00156/S42,
22/00168/MSC,
24/00352/MSC
277 0 0 277 36 36 36 36 36 36 36 25 0 0 277 0
Page 102 of 154

Page 103

69 
Reference     
Site Name  
Location
HMSA
Site Area
Tenure
Private Tenure
Social Rent Provider
Intermediate
Tenure
AHP    
Landowner/Developer 
Planning Status
Consent     
Application reference
Capacity
2023-24 completions
Total Complete
Remainder/ Established Supply
2024-25 (Short)
2025-26 (Short)
2026-27 (Short)
2027-28 (Medium)
2028-29 (Medium)
2029-30 (Medium)
2030-31 (Long)
2031-32 (Long)
2032-33 (Long)
2033-34 (Long)
Total 10 year
Beyond 10 year
NLMW1177 East of North and South Road
(Bellside)
Cleland MW 1.32 PRIV OO    Taylor Homes COMM DETL 19/01376/FUL,
21/00371/AMD,
20/01233/FUL,
20/01229/FUL,
20/01224/FUL,
21/01017/FUL,
22/00077/FUL,
22/00046/FUL,
22/01172/AMD,
22/01385/AMD,
23/00777/FUL,
22/00077/FUL
10 0 0 10 1 2 0 0 0 0 0 0 0 0 3 7
NLMK1152 Easterton Farm Caldercruix AC 2.92 PRIV OO    Hendersons Chartered
Surveyors
ALPS   78 0 0 78 0 0 0 30 30 18 0 0 0 0 78 0
NLMK1147 Eastfield Farm, Eastfield Road Caldercruix AC 0.79 PRIV OO    M Le Maistre & M P
Gajenska
ALPS LAPD 14/00776/FUL,
19/01351/AMD
10 0 0 10 0 0 0 0 0 0 0 0 0 0 0 10
NLCN1041A Eastfield Road Cumbernauld CN 2.80 PRIV OO    Springfield Homes ALPS   38 0 0 38 0 0 0 0 19 19 0 0 0 0 38 0
NLCN1041B Eastfield Road Cumbernauld CN 2.80 SR  RSL  AHP Springfield Homes ALPS   12 0 0 12 0 0 0 0 6 6 0 0 0 0 12 0
NLMW1178 Excelsior Street Wishaw MW 0.61 PRIV OO    Keppie Planning Ltd for
Philip C Smith
Commercials
ALPS   15 0 0 15 0 0 0 15 0 0 0 0 0 0 15 0
NLMK1354 Fmr Funky Monkeys, 1
Muiryhall Street
Coatbridge AC 0.08 PRIV OO    Mr Hugh McKenzie CONS DETL 21/01550/FUL 14 0 0 14 0 14 0 0 0 0 0 0 0 0 14 0
NLMW1351 Former Church Mason Lane Motherwell MW 0.09 PRIV OO    Hood Projects Ltd CONS DETL 20/01492/FUL 4 0 0 4 0 2 0 0 0 0 0 0 0 0 2 2
NLMW1235 Former Coach House Pub
(Derelict) 35 Main Street
Holytown MW 0.08 PRIV OO    Mr & Mrs Sarwar ALPS LAPD 16/01496/FUL 4 0 0 4 0 0 0 0 0 0 0 0 0 0 0 4
NLMW1315 Former Council Office, 303
Brandon Street
Motherwell MW 0.57 SR  LA   North Lanarkshire
Council
COMM DETL 21/01831/FUL,
21/01832/LBC
48 0 0 48 48 0 0 0 0 0 0 0 0 0 48 0
NLCN1257 Former Cumbernauld Village
Primary School
Cumbernauld CN 0.52 PRIV OO    North Lanarkshire
Council
CONS DETL 19/00405/FUL,
21/00685/FUL,
24/00011/FUL
8 0 0 8 0 0 8 0 0 0 0 0 0 0 8 0
NLCN1343B Former Inland Revenue St
Mungo's Road
Cumbernauld CN 4.83 SR  RSL  AHP SSHA CONS OUTL 21/00372/PPP 184 0 0 184 0 0 84 100 0 0 0 0 0 0 184 0
NLMK1347 Former Ladbrokes 110 Main
Street
Caldercruix AC 0.08 PRIV OO    Mrs Liane Mahoney CONS OUTL 21/01820/PPP 4 0 0 4 0 2 0 0 0 0 0 0 0 0 2 2
NLMW1375 Former Masonic Hall Motherwell MW 0.04 SR  LA   North Lanarkshire
Council
PROP   10 0 0 10 0 0 0 0 10 0 0 0 0 0 10 0
NLMK1271 Former Miners Welfare (Ellis
Street)
Coatbridge AC 0.55 PRIV OO    Cairn HA/North
Lanarkshire Council
PROP   27 0 0 27 0 0 27 0 0 0 0 0 0 0 27 0
NLMK1318 Former Municipal Buildings,
Kildonan Street
Coatbridge AC 0.29 SR  LA   North Lanarkshire
Council
CONS DETL 19/00448/PREAPE,
23/01334/FUL,
23/01335/LBC
43 0 0 43 0 0 0 43 0 0 0 0 0 0 43 0
NLMW1131 Former Nursery Legbrannock
Road
Newarthill MW 0.44 PRIV OO    Snowie Support Services alps LAPD 12/01107/PPP,
19/00616/FUL
12 0 0 12 0 0 0 0 0 0 0 0 0 0 0 12
NLMW1230 Former Overtown Primary
School
Overtown MW 0.40 SR  RSL   Clyde Valley HA COMM DETL 18/00998/FUL 17 0 0 17 17 0 0 0 0 0 0 0 0 0 17 0
NLMK1314 Former Police Station, 50 Main
Street
Glenboig AC 0.21 SR  LA   North Lanarkshire
Council
CONS DETL 21/01667/FUL 7 0 0 7 0 7 0 0 0 0 0 0 0 0 7 0
Page 103 of 154

Page 104

70 
Reference     
Site Name  
Location
HMSA
Site Area
Tenure
Private Tenure
Social Rent Provider
Intermediate
Tenure
AHP    
Landowner/Developer 
Planning Status
Consent     
Application reference
Capacity
2023-24 completions
Total Complete
Remainder/ Established Supply
2024-25 (Short)
2025-26 (Short)
2026-27 (Short)
2027-28 (Medium)
2028-29 (Medium)
2029-30 (Medium)
2030-31 (Long)
2031-32 (Long)
2032-33 (Long)
2033-34 (Long)
Total 10 year
Beyond 10 year
NLMK0558 Former St Mary's PS, Hill
Street
Caldercruix AC 1.32 SR  LA   North Lanarkshire
Council
PROP   25 0 0 25 0 0 0 0 25 0 0 0 0 0 25 0
NLCN1344B Former The Kingfisher
Dowanfield Road
Cumbernauld CN 0.42 SR  RSL  AHP North Lanarkshire
Council
COMM DETL 21/00818/FUL 24 0 0 24 24 0 0 0 0 0 0 0 0 0 24 0
NLMK0578 Former Travelling Peoples
Site, Mollinsburn Road
Annathill AC 1.63 PRIV OO    P McKernan Construction
Ltd
CONS DETL 07/01303/FUL,
22/00515/FUL
24 0 0 24 0 12 12 0 0 0 0 0 0 0 24 0
NLMK1290 Former United Reform Church,
Bank Street
Coatbridge AC 0.15 SR  RSL   Wheatley CONS DETL 21/01683/FUL 17 0 0 17 0 17 0 0 0 0 0 0 0 0 17 0
NLMW1239 Former Woodend Caravan
Park, Mill Road
Allanton MW 1.05 PRIV OO    Mr Stuart Wilshire ALPS LAPD 17/00937/PPP 6 0 0 6 0 0 0 0 0 0 0 0 0 0 0 6
NLMK1349 Former Work & Pensions, 1-3
South Circular Road
Coatbridge AC 0.28 SR  LA   North Lanarkshire
Council
CONS DETL 21/01164/FUL 39 0 0 39 0 39 0 0 0 0 0 0 0 0 39 0
NLSK1320 Former Yard, Gartloch Road Gartcosh CN 0.29 SR  RSL   Link PROP  22/01452/FUL 22 0 0 22 0 22 0 0 0 0 0 0 0 0 22 0
NLMW0791 Garrion Farm Overtown MW 18.75 PRIV OO    Taylor Grange (Garrion)
Ltd/ Glasshouse
Developments
CONS OUTL 16/00956/PAN,
21/01258/PPP
150 0 0 150 0 0 0 35 35 35 35 10 0 0 150 0
NLSK1278A Gartcosh Glenboig CGA -
Heathfield
Gartcosh CN 33.85 PRIV OO     CONS DETL 17/01766/PAN,
19/00274/PPP
368 0 0 368 0 0 0 0 0 0 0 0 0 0 0 368
NLSK1278B Gartcosh Glenboig CGA -
Heathfield
Gartcosh CN 33.85 SR  RSL  AHP  CONS DETL 17/01766/PAN,
19/00274/PPP
92 0 0 92 0 0 0 0 0 0 0 0 0 0 0 92
NLSK1359A Gartcosh Glenboig CGA -
Heathfield - Persimmon &
Avant
Gartcosh CN 12.08 PRIV OO    Persimmon Homes Ltd
and Avant Homes
COMM DETL 17/01766/PAN,
19/00274/PPP,
19/01213/MSC,
22/01250/S42
250 11 11 239 36 40 40 40 40 32 11 0 0 0 239 0
NLSK1359B Gartcosh Glenboig CGA -
Heathfield - Persimmon &
Avant
Gartcosh CN 12.08 SR  RSL  AHP Persimmon Homes Ltd
and Sanctuary
COMM DETL 17/01766/PAN,
19/00274/PPP,
19/01213/MSC,
22/01250/S42
44 0 0 44 19 25 0 0 0 0 0 0 0 0 44 0
NLSK1247A Gartcosh Glenboig CGA
Johnston Farm
Gartcosh CN 3.83 PRIV OO     ALPS  16/02384/PAN 72 0 0 72 0 0 0 0 0 0 0 0 0 0 0 72
NLSK1247B Gartcosh Glenboig CGA
Johnston Farm
Gartcosh CN 3.83 SR  RSL    ALPS  16/02384/PAN 24 0 0 24 0 0 0 0 0 0 0 0 0 0 0 24
NLSK0442A2 Gartcosh Glenboig CGA
Remainder
Gartcosh CN 30.60 SR  RSL   Persimmon Homes Ltd ALPS  17/01766/PAN 182 0 0 182 0 0 0 0 0 0 0 0 0 0 0 182
NLMK1211A Gartcosh/Glenboig CGA
(Garnqueen Farm)
Glenboig AC 6.68 PRIV OO    Muir Homes Ltd COMM DETL 14/01594/PPP,
16/02332/MSC
143 21 121 22 22 0 0 0 0 0 0 0 0 0 22 0
NLMK0442B1 Gartcosh/Glenboig CGA
(Glenboig Remainder)
Glenboig AC 11.00 PRIV OO    Consortium - Doug
Riddell Consultancy,
NLC & Banks
CONS OUTL 14/01594/PPP 231 0 0 231 0 0 0 0 0 0 0 0 0 0 0 231
NLMK1304 Gartcosh/Glenboig CGA (Main
Street Glenboig)
Glenboig AC 27.33 PRIV OO    Taylor Wimpey COMM OUTL 14/01594/PPP,
20/00035/MSC,
21/00459/AMD
535 46 49 486 50 50 50 50 50 50 50 50 50 36 486 0
NLMK1328 Gartcosh/Glenboig CGA Area
D - Site to NE of Hayhill
Cottage, Glenboig Road
Glenboig AC 1.38 PRIV OO    Callanish Homes
(Glenboig) Ltd/ Avant
Homes
COMM DETL 19/01435/MSC 31 0 0 31 15 16 0 0 0 0 0 0 0 0 31 0
Page 104 of 154

Page 105

71 
Reference     
Site Name  
Location
HMSA
Site Area
Tenure
Private Tenure
Social Rent Provider
Intermediate
Tenure
AHP    
Landowner/Developer 
Planning Status
Consent     
Application reference
Capacity
2023-24 completions
Total Complete
Remainder/ Established Supply
2024-25 (Short)
2025-26 (Short)
2026-27 (Short)
2027-28 (Medium)
2028-29 (Medium)
2029-30 (Medium)
2030-31 (Long)
2031-32 (Long)
2032-33 (Long)
2033-34 (Long)
Total 10 year
Beyond 10 year
NLSK1206A Gartcosh/Glenboig CGA
Bothlin Burn North
Gartcosh CN 6.80 PRIV OO    Bellway Homes &
Deuchny Properties
COMM OUTL 13/01958/PPP,
16/02234/MSC,
21/01459/MSC,
23/00587/AMD
95 13 13 82 30 30 22 0 0 0 0 0 0 0 82 0
NLSK1206B Gartcosh/Glenboig CGA
Bothlin Burn North
Gartcosh CN 6.81 SR  RSL  AHP Bellway Homes &
Deuchny Properties
COMM OUTL 13/01958/PPP,
21/01459/MSC
12 0 0 12 12 0 0 0 0 0 0 0 0 0 12 0
NLSK1207A Gartcosh/Glenboig CGA
Bothlin Burn South
Gartcosh CN 1.43 PRIV OO     CONS OUTL 13/01958/PPP,
21/01461/S42
38 0 0 38 0 0 0 19 19 0 0 0 0 0 38 0
NLSK1207B Gartcosh/Glenboig CGA
Bothlin Burn South
Gartcosh CN 1.43 SR  RSL    CONS OUTL 13/01958/PPP,
18/00281/FUL,
21/01461/S42
12 0 0 12 0 0 0 6 6 0 0 0 0 0 12 0
NLSK0442A1 Gartcosh/Glenboig CGA
Remainder
Gartcosh CN 30.60 PRIV OO    Persimmon Homes Ltd ALPS  17/01766/PAN 303 0 0 303 0 0 0 0 0 0 0 0 0 0 0 303
NLMK1345 Gartcosh/Glenboig CGA Site
South Of Glenburn Gardens
Glenboig AC 0.76 PRIV OO    Callanish Homes
(Glenboig) Ltd
COMM DETL 19/01434/MSC,
24/00661/AMD
13 0 0 13 0 0 0 0 0 0 0 0 0 0 0 13
NLSK1107A Gartferry Road Chryston CN 3.75 PRIV OO    Allanwater COMM DETL 13/02351/FUL,
19/01316/AMD
68 13 33 35 35 0 0 0 0 0 0 0 0 0 35 0
NLSK1107B Gartferry Road Chryston CN 3.75 SR  LA  AHP North Lanarkshire
Council
COMM DETL 13/02351/FUL,
19/01316/AMD
22 0 0 22 22 0 0 0 0 0 0 0 0 0 22 0
NLSK1258A Gateside Stepps CN 13.95 PRIV OO    Barratt Homes West
Scotland and Cala
Homes (West)
COMM OUTL 16/01271/PPP,
20/01359/MSC
170 69 74 96 70 26 0 0 0 0 0 0 0 0 96 0
NLMW1120 Glebe Farm Manse Road Salsburgh MW 0.44 PRIV OO    Douglas Mawdsley COMM DETL 11/00153/FUL,
14/01241/AMD
4 1 1 3 0 0 0 0 0 0 0 0 0 0 0 3
NLMK0567 Glengowan House Gowan
Brae
Caldercruix AC 0.81 PRIV OO    Mr & Mrs Hopkins COMM DETL 10/00915/AMD 14 0 2 12 0 0 0 0 0 0 0 0 0 0 0 12
NLMW1329 Gowkthrapple (Castlehill 2)
Phase 2
Wishaw MW 3.91 SR  LA   North Lanarkshire
Council
ALPS  09/00859/PPP,
21/00982/PPP,
21/01316/FUL
100 0 0 100 0 0 0 50 50 0 0 0 0 0 100 0
NLMW1027A Gowkthrapple (Castlehill)
Phase 1
Wishaw MW 4.61 SR  LA   North Lanarkshire
Council
COMM DETL 21/00982/PPP,
21/01316/MSC
97 18 18 79 79 0 0 0 0 0 0 0 0 0 79 0
NLSK0432 Greenlea Road / Berryknowe
Avenue
Chryston CN 0.25 SR  RSL   Caledonian Housing
Association
COMM DETL 05/01003/FUL,
20/01066/FUL
9 0 0 9 9 0 0 0 0 0 0 0 0 0 9 0
NLMK1212 Hallcraig Street (Mill Loan) Airdrie AC 0.05 SR  RSL   Clyde Valley HA COMM DETL 17/00868/FUL,
18/01145/FUL
16 0 0 16 0 16 0 0 0 0 0 0 0 0 16 0
NLMW1162 Hattonrigg Bellshill MW 3.01 PRIV OO    Dawn Homes Ltd COMM DETL 20/01030/PAN,
20/01540/FUL
74 5 5 69 30 30 9 0 0 0 0 0 0 0 69 0
NLMW1303 High Street Newarthill MW 2.07 PRIV OO    Woodside Developments ALPS LAPD 17/00062/PPP,
19/00416/FUL,
23/00835/FUL
49 0 0 49 0 0 0 25 24 0 0 0 0 0 49 0
NLSK1339 Hillview Farm, Lenzie Road Stepps CN 0.95 PRIV OO    Ms Nadia Miller ALPS DETL 20/00018/FUL 4 0 0 4 0 0 0 0 0 0 0 0 0 0 0 4
NLMW1325 King street car park Wishaw MW 0.12 SR  LA   North Lanarkshire
Council
CONS DETL 21/00801/PREAPE,
22/00384/FUL
5 0 0 5 0 0 5 0 0 0 0 0 0 0 5 0
NLMW1324 King's House, King Street Wishaw MW 0.21 SR  LA   North Lanarkshire
Council
CONS DETL 21/00801/PREAPE,
23/00688/FUL
18 0 0 18 0 0 18 0 0 0 0 0 0 0 18 0
NLMW1267 Laburnum Road Viewpark MW 1.21 SR  LA   North Lanarkshire
Council
CONS DETL 19/01102/FUL,
24/00080/S42
26 0 0 26 0 0 26 0 0 0 0 0 0 0 26 0
Page 105 of 154

Page 106

72 
Reference     
Site Name  
Location
HMSA
Site Area
Tenure
Private Tenure
Social Rent Provider
Intermediate
Tenure
AHP    
Landowner/Developer 
Planning Status
Consent     
Application reference
Capacity
2023-24 completions
Total Complete
Remainder/ Established Supply
2024-25 (Short)
2025-26 (Short)
2026-27 (Short)
2027-28 (Medium)
2028-29 (Medium)
2029-30 (Medium)
2030-31 (Long)
2031-32 (Long)
2032-33 (Long)
2033-34 (Long)
Total 10 year
Beyond 10 year
NLCN0365A Ladeside Extension Kilsyth CN 1.50 PRIV OO    P McKernan Construction
Ltd
CONS DETL 21/00307/FUL 23 0 0 23 0 0 23 0 0 0 0 0 0 0 23 0
NLCN0365B Ladeside Extension Kilsyth CN 1.50 SR  RSL   P McKernan Construction
Ltd
CONS DETL 21/00307/FUL 15 0 0 15 0 0 15 0 0 0 0 0 0 0 15 0
NLSK1195A Lammerknowes Road Banton CN 2.28 PRIV OO    Advance Construction
Ltd
CONS OUTL 20/01509/PAN,
21/00665/PPP
41 0 0 41 0 0 0 21 20 0 0 0 0 0 41 0
NLSK1195B Lammerknowes Road Banton CN 2.28 SR  RSL  AHP Advance Construction
Ltd
CONS OUTL 20/01509/PAN,
21/00665/PPP
13 0 0 13 0 0 0 13 0 0 0 0 0 0 13 0
NLMW1238 Land at 2 Cleland Road Carfin MW 0.08 PRIV OO    Mr M Tariq ALPS LAPD 16/00301/PPP 6 0 0 6 0 0 0 0 0 0 0 0 0 0 0 6
NLMW0761 Land at 391-395 Caledonian
Road
Wishaw MW 0.26 SR  RSL   Link ALPS LAPD 07/01055/FUL,
23/00846/FUL
21 0 0 21 0 0 21 0 0 0 0 0 0 0 21 0
NLMW1370 Land At 91 Benhar Road Shotts MW 0.16 PRIV OO    WB Properties Scotland
Ltd
CONS DETL 22/01112/FUL 5 0 0 5 0 0 3 2 0 0 0 0 0 0 5 0
NLMK1150 Land at Berryhill, Stand
(formerly Stirling Road)
Airdrie AC 51.16 PRIV OO    Taylor Wimpey/ Barratt
Homes
CONS DETL 18/01785/PPP,
22/00430/MSC
523 0 0 523 0 30 30 30 30 30 30 30 30 30 270 253
NLMW1368 Land at East Redmyre Farm
Allanton Road
Allanton MW 0.59 PRIV OO    Hardie Associates on
behalf of W Moffat & Son
CONS DETL 22/01248/FUL 4 0 0 4 0 0 2 0 0 0 0 0 0 0 2 2
NLMW1350 Land at Meadowhead Road Wishaw MW 1.21 PRIV OO    Keepmoat Homes CONS DETL 21/00463/FUL 12 0 0 12 0 12 0 0 0 0 0 0 0 0 12 0
NLMK1159 Land at Mosside Farm Airdrie AC 7.06 PRIV OO    McNally Associates on
behalf of Mr Hall
ALPS   200 0 0 200 0 0 0 30 30 30 30 30 30 20 200 0
NLMW1183 Land at Priory Lodge
(Gowkthrapple)
Wishaw MW 1.79 PRIV OO    MacGarvie & Co Ltd for
Paterson Partners
ALPS   50 0 0 50 0 0 0 30 20 0 0 0 0 0 50 0
NLMW1322 Land at Reema Road Bellshill MW 1.59 SR  RSL   Trust HA CONS DETL 20/00661/FUL 48 0 0 48 0 0 48 0 0 0 0 0 0 0 48 0
NLMW1352 Land At Wellington Street Wishaw MW 0.27 PRIV OO    Keepmoat Homes CONS DETL 21/00464/FUL,
24/00381/AMD
47 0 0 47 0 24 23 0 0 0 0 0 0 0 47 0
NLMW1237 Land east of Hannah Park
(Shotts BA FC)
Shotts MW 0.37 PRIV OO    SMS Homes Scotland
Llp
COMM DETL 17/01166/PPP,
18/01754/FUL,
22/00602/FUL
10 2 5 5 3 2 0 0 0 0 0 0 0 0 5 0
NLMK1185 Land East of Langmuir Road Bargeddie AC 8.30 PRIV OO    Tinto Family ALPS   205 0 0 205 0 0 0 0 0 0 0 0 0 0 0 205
NLMW0364 Land East Of Morningside
Road
Newmains MW 1.38 PRIV OO    Mr Stewart Hill ALPS LAPD 13/00357/AMD,
16/00057/PPP,
20/01469/S42
17 0 0 17 0 0 0 0 0 0 0 0 0 0 0 17
NLMK1184 Land north of Coatbridge Road Bargeddie AC 6.00 PRIV OO    Rydens for PAMG Ltd CONS DETL 20/00827/FUL 142 0 0 142 0 0 0 26 26 26 26 26 12 0 142 0
NLMW1357 Land South of 179 Milton
Street
Motherwell MW 0.09 PRIV OO    HM Properties Glasgow
Ltd
CONS DETL 22/00601/FUL 4 0 0 4 0 0 2 0 0 0 0 0 0 0 2 2
NLMK1190 Land South of Carnbroe
(Barratt Phase)
Coatbridge AC 10.06 PRIV OO    Barratt Homes West
Scotland
COMM DETL 14/01575/PPP,
15/01792/PPP,
18/00279/AMD,
18/01043/AMD,
18/01326/MSC,
20/00225/FUL
210 35 111 99 40 40 19 0 0 0 0 0 0 0 99 0
NLMK1355 Land South of Carnbroe (TW
Later Phase)
Coatbridge AC 5.45 PRIV OO    Taylor Wimpey CONS DETL 15/01792/PPP,
20/00948/S42,
21/01065/MSC,
24/00210/FUL
100 0 0 100 0 0 0 50 50 0 0 0 0 0 100 0
Page 106 of 154

Page 107

73 
Reference     
Site Name  
Location
HMSA
Site Area
Tenure
Private Tenure
Social Rent Provider
Intermediate
Tenure
AHP    
Landowner/Developer 
Planning Status
Consent     
Application reference
Capacity
2023-24 completions
Total Complete
Remainder/ Established Supply
2024-25 (Short)
2025-26 (Short)
2026-27 (Short)
2027-28 (Medium)
2028-29 (Medium)
2029-30 (Medium)
2030-31 (Long)
2031-32 (Long)
2032-33 (Long)
2033-34 (Long)
Total 10 year
Beyond 10 year
NLMK1326 Land South of Carnbroe (TW
Phase)
Coatbridge AC 8.23 PRIV OO    Taylor Wimpey COMM DETL 15/01792/PPP,
20/00948/S42,
21/01065/MSC
188 0 0 188 50 50 50 38 0 0 0 0 0 0 188 0
NLMK1189 Land south of Deanstone
Place (Carnbroe)
Coatbridge AC 2.21 PRIV OO    Keppie Planning Ltd for
Miller Homes
ALPS   55 0 0 55 0 0 0 0 0 0 0 0 0 0 0 55
NLMK1360 Land south of Ryden Mains
Farm
Glenmavis AC 4.50 PRIV OO    Albert Bartlett ALPS  23/01330/PAN,
24/00049/EIASCR
120 0 0 120 0 0 0 30 30 30 30 0 0 0 120 0
NLMW0804 Land West of Greenhill Road Hareshaw MW 0.68 PRIV OO    Alec Bankier & Company COMM DETL 09/01162/PPP,
11/01389/MSC,
15/02047/FUL,
21/00694/FUL,
22/00331/FUL
6 0 3 3 1 0 0 0 0 0 0 0 0 0 1 2
NLMK0607 Langdales Farm Greengairs AC 0.24 PRIV OO    Mr David Ballantyne ALPS LAPD 15/02351/FUL,
19/00021/FUL
4 0 0 4 0 0 0 0 0 0 0 0 0 0 0 4
NLSK1191A Lanrigg Old Lindsaybegg Road Chryston CN 1.36 PRIV OO    Ms Coffey ALPS   28 0 0 28 0 0 0 0 0 0 0 0 0 0 0 28
NLSK1191B Lanrigg Old Lindsaybegg Road Chryston CN 1.36 SR  RSL   Ms Coffey ALPS   6 0 0 6 0 0 0 0 0 0 0 0 0 0 0 6
NLCN1353 Lennox House, Lennox Road Cumbernauld CN 0.3 SR  RSL   SSHA CONS DETL 23/00693/FUL 44 0 0 44 0 0 44 0 0 0 0 0 0 0 44 0
NLCN1276 Millcroft Road Cumbernauld CN 1.16 SR  LA   North Lanarkshire
Council
ALPS  19/00298/PREAPE,
24/00319/FUL
72 0 0 72 0 0 0 72 0 0 0 0 0 0 72 0
NLMW1291 Motherwell Town Hall Motherwell MW 0.08 SR  LA   North Lanarkshire
Council
CONS DETL 21/00525/FUL,
21/00524/LBC
20 0 0 20 0 20 0 0 0 0 0 0 0 0 20 0
NLMW1166 Netherton Street Wishaw MW 0.67 PRIV OO    Quod for Scotia Gas
Networks
ALPS  17/00146/PRD 16 0 0 16 0 0 0 16 0 0 0 0 0 0 16 0
NLCN1307 Netherwood Farm, Wyndford
Road
Cumbernauld CN 0.78 PRIV OO    Blackbull Estates Limited ALPS LAPD 18/01799/FUL 4 0 0 4 0 0 0 0 0 0 0 0 0 0 0 4
NLMW1132 North of 158 Morningside
Road
Morningside MW 0.47 PRIV OO    A King, P Ferris, I
Wardrope
ALPS  12/01257/PPP,
18/00718/FUL
13 0 0 13 0 0 0 0 0 0 0 0 0 0 0 13
NLMW0677 North of 201 Morningside
Road
Newmains MW 0.26 PRIV OO    W.S. Macfarlane CONS OUTL 13/00385/AMD,
16/01019/PPP,
19/01128/PPP,
22/01318/PPP
4 0 0 4 0 0 2 0 0 0 0 0 0 0 2 2
NLMK1158 North of Leaend Road Airdrie AC 1.62 SR  LA   North Lanarkshire
Council
ALPS  22/01457/PREAPP 41 0 0 41 0 0 0 24 17 0 0 0 0 0 41 0
NLMW1250 Overtown Road Waterloo Wishaw MW 1.61 PRIV OO    North Lanarkshire
Council
ALPS   40 0 0 40 0 0 0 20 20 0 0 0 0 0 40 0
NLMW1260 Paxtane Farm - East Harthill MW 3.30 SR  RSL   Springfield Properties Plc COMM DETL 17/01586/FUL 100 8 31 69 0 0 25 25 19 0 0 0 0 0 69 0
NLMW1165 Pentland Road (former st
matthews primary)
Wishaw MW 3.51 PRIV OO    North Lanarkshire
Council
ALPS   85 0 0 85 0 0 0 22 22 22 19 0 0 0 85 0
NLMK0559 Plains Primary School Site Plains AC 0.55 PRIV OO    NLC ALPS   12 0 0 12 0 0 0 0 0 0 0 0 0 0 0 12
NLMK0531 Pool Club Coats Street Coatbridge AC 0.22 PRIV OO    Kada Properties Limited COMM DETL 12/00520/FUL,
16/00642/FUL
18 0 0 18 8 10 0 0 0 0 0 0 0 0 18 0
NLMK0280 Rankin Crescent Greengairs AC 3.16 PRIV OO    Multiple COMM DETL 06/00336/OUT,
19/01277/FUL,
19/00995/FUL,
20/01353/FUL,
64 0 19 45 0 0 0 0 0 0 0 0 0 0 0 45
Page 107 of 154

Page 108

74 
Reference     
Site Name  
Location
HMSA
Site Area
Tenure
Private Tenure
Social Rent Provider
Intermediate
Tenure
AHP    
Landowner/Developer 
Planning Status
Consent     
Application reference
Capacity
2023-24 completions
Total Complete
Remainder/ Established
Supply
2024-25 (Short)
2025-26 (Short)
2026-27 (Short)
2027-28 (Medium)
2028-29 (Medium)
2029-30 (Medium)
2030-31 (Long)
2031-32 (Long)
2032-33 (Long)
2033-34 (Long)
Total 10 year
Beyond 10 year
NLMW1282A Ravenscraig C1 Motherwell MW 10.50 PRIV OO    Ravenscraig Ltd CONS OUTL 18/00463/PPP 214 0 0 214 0 0 0 0 0 0 0 0 0 0 0 214
NLMW1282B Ravenscraig C1 Motherwell MW 10.50 SR  RSL   Ravenscraig Ltd CONS OUTL 18/00463/PPP 24 0 0 24 0 0 0 0 0 0 0 0 0 0 0 24
NLMW0573O1 Ravenscraig
Craigneuk/Roman Road
Motherwell MW 26.14 PRIV OO    Ravenscraig Ltd CONS OUTL 01/00758/OUT.
18/00463/PPP
567 0 0 567 0 0 0 0 0 0 0 0 0 0 0 567
NLMW0573O2 Ravenscraig
Craigneuk/Roman Road
Motherwell MW 26.14 SR  RSL   Ravenscraig Ltd CONS OUTL 01/00758/OUT.
18/00463/PPP
63 0 0 63 0 0 0 0 0 0 0 0 0 0 0 63
NLMW1287A Ravenscraig New Town Centre Motherwell MW 6.96 PRIV OO    Ravenscraig Ltd CONS OUTL 18/00463/PPP 270 0 0 270 0 0 0 0 0 0 0 0 0 0 0 270
NLMW1287B Ravenscraig New Town Centre Motherwell MW 6.96 SR  RSL   Ravenscraig Ltd CONS OUTL 18/00463/PPP 30 0 0 30 0 0 0 0 0 0 0 0 0 0 0 30
NLMW0573L1 Ravenscraig P Phase (Nether
Johnston)
Motherwell MW 40.56 PRIV OO    Ravenscraig Ltd CONS OUTL 01/00758/OUT,
18/00463/PPP
952 0 0 952 0 0 0 0 0 0 0 0 0 0 0 952
NLMW0573L2 Ravenscraig P Phase (Nether
Johnston)
Motherwell MW 40.56 SR  RSL   Ravenscraig Ltd CONS OUTL 01/00758/OUT,
18/00463/PPP
106 0 0 106 0 0 0 0 0 0 0 0 0 0 0 106
NLMW0573M1 Ravenscraig W Phase
(Meadowhead)
Motherwell MW 43.17 PRIV OO    Ravenscraig Ltd CONS OUTL 01/00758/OUT,
18/00463/PPP
938 0 0 938 0 0 0 0 0 0 0 0 0 0 0 938
NLMW0573M2 Ravenscraig W Phase
(Meadowhead)
Motherwell MW 43.17 SR  RSL   Ravenscraig Ltd CONS OUTL 01/00758/OUT,
18/00463/PPP
104 0 0 104 0 0 0 0 0 0 0 0 0 0 0 104
NLMW0792 Rosehall Road Shotts MW 1.23 PRIV OO    Anco Construction Ltd ALPS  07/01334/FUL,
21/00226/FUL
49 0 0 49 0 0 0 25 24 0 0 0 0 0 49 0
NLMK1157 Roughrigg Road Longriggend AC 0.75 PRIV OO    A Reid Building Services
Ltd
ALPS   19 0 0 19 0 0 0 10 9 0 0 0 0 0 19 0
NLMW1172 Royal George Newmains MW 19.03 PRIV OO    Turley Associates for Mr
S Hill
ALPS   200 0 0 200 0 0 0 0 0 0 0 0 0 0 0 200
NLMK1297 Shawhead (Dunnottar Avenue) Coatbridge AC 4.02 SR  LA   North Lanarkshire
Council
PROP  23/00932/PAN,
24/00156/FUL
100 0 0 100 0 0 100 0 0 0 0 0 0 0 100 0
NLMW0540 Shieldmuir St Motherwell MW 0.19 PRIV OO    NLC ALPS   20 0 0 20 0 0 0 0 0 0 0 0 0 0 0 20
NLCN1330 Site at 49 Cumbernauld Road Mollinsburn CN 0.21 PRIV OO    James Kane & Sons Ltd ALPS LAPD 19/01386/PPP 6 0 0 6 0 0 0 0 0 0 0 0 0 0 0 6
NLMK1348 Site At Former Petersburn
Primary School
Airdrie AC 1.46 SR  LA   North Lanarkshire
Council
COMM DETL 22/00283/FUL 40 0 0 40 40 0 0 0 0 0 0 0 0 0 40 0
NLMK1316 Site at Glenacre Drive Airdrie AC 0.43 SR  LA   North Lanarkshire
Council
COMM DETL 22/00155/FUL 16 0 0 16 16 0 0 0 0 0 0 0 0 0 16 0
NLCN1332 Site at Highland Place Kilsyth CN 0.11 PRIV OO    Mr Garry Cowan CONS OUTL 20/00996/PPP 6 0 0 6 0 0 0 0 0 0 0 0 0 0 0 6
NLMK1362 Site at Main Street/Church
Street/Academy Street
Coatbridge AC 0.24 SR  LA   North Lanarkshire
Council
CONS DETL 23/00073/FUL 49 0 0 49 0 0 0 0 49 0 0 0 0 0 49 0
NLMK1200 Site east of Oakridge Road Coatbridge AC 10.00 PRIV OO    Barratt Homes West
Scotland
COMM DETL 16/00455/PPP,
17/01233/MSC,
19/01097/FUL,
19/00871/AMD
199 40 191 8 8 0 0 0 0 0 0 0 0 0 8 0
NLMK1241 Site East of St Philip's School Plains AC 1.18 PRIV OO    St. Philip's School CONS DETL 16/02298/PPP,
23/00287/PPP
30 0 0 30 0 0 30 0 0 0 0 0 0 0 30 0
NLCN1342 Site North Of 42 Hillside Croy CN 0.12 PRIV OO    Modern Homes
Developments Ltd
CONS DETL 20/01341/FUL,
24/00193/S42
4 0 0 4 0 0 2 0 0 0 0 0 0 0 2 2
NLMW1310 Site North of Bellshill Road Uddingston MW 4.56 PRIV OO    WB Properties Scotland
Ltd
CONS OUTL 17/00518/PPP,
22/00325/MSC
88 0 0 88 0 0 22 22 22 22 0 0 0 0 88 0
NLMW0777 Site North of Viewfield House Harthill MW 0.39 PRIV OO    Mrs Lindsay Kane CONS DETL 08/00040/OUT,
17/00407/PPP
4 0 1 3 0 0 0 0 0 0 0 0 0 0 0 3
Page 108 of 154

Page 109

75 
Reference     
Site Name  
Location
HMSA
Site Area
Tenure
Private Tenure
Social Rent Provider
Intermediate
Tenure
AHP    
Landowner/Developer 
Planning Status
Consent     
Application reference
Capacity
2023-24 completions
Total Complete
Remainder/ Established Supply
2024-25 (Short)
2025-26 (Short)
2026-27 (Short)
2027-28 (Medium)
2028-29 (Medium)
2029-30 (Medium)
2030-31 (Long)
2031-32 (Long)
2032-33 (Long)
2033-34 (Long)
Total 10 year
Beyond 10 year
NLMK0588 Site of Former Alexander
Hospital, Blair Road
Coatbridge AC 1.48 PRIV OO    Turnberry Homes Ltd COMM DETL 10/00772/AMD,
19/00529/FUL,
20/01141/AMD
38 23 29 9 9 0 0 0 0 0 0 0 0 0 9 0
NLMW1374 Site of former Allan And
Coursington Towers
Motherwell MW 0.71 SR     North Lanarkshire
Council
PROP   44 0 0 44 0 0 44 0 0 0 0 0 0 0 44 0
NLMW1284 Site of Former Cleland
Hospital
Cleland MW 2.91 PRIV OO    Persimmon Homes Ltd COMM DETL 19/00510/FUL 86 25 83 3 3 0 0 0 0 0 0 0 0 0 3 0
NLMK1361 Site of former Cogent
Communications Victoria
Place Cairnhill
Airdrie AC 1.96 PRIV OO    P McKernan Construction
Ltd
CONS DETL 21/01602/FUL 40 0 0 40 0 0 20 20 0 0 0 0 0 0 40 0
NLMW1373 Site of former Draffen Tower Motherwell MW 0.68 SR  LA   North Lanarkshire
Council
PROP   40 0 0 40 0 0 40 0 0 0 0 0 0 0 40 0
NLMW1240 Site of Former Rowan Tree
(pub)
Newmains MW 0.15 PRIV OO    Mr James Hayes CONS DETL 17/01837/FUL,
23/00293/AMD
10 0 0 10 0 0 0 10 0 0 0 0 0 0 10 0
NLMW0728 Site of Former St Ignatius
Primary School, 47 Graham
Street
Wishaw MW 0.19 SR  LA   North Lanarkshire
Council
CONS  21/00801/PREAPE,
22/00371/FUL
13 0 0 13 0 0 13 0 0 0 0 0 0 0 13 0
NLMW1088 Site of Former Waterloo
Primary School
Wishaw MW 0.29 PRIV OO    North Lanarkshire
Council
ALPS   10 0 0 10 0 0 0 0 0 0 0 0 0 0 0 10
NLMK0592 Site of Former Winning Post
186 Main Street
Calderbank AC 0.30 PRIV OO    Woodhall Homes COMM DETL 15/02563/FUL,
23/00622/PREAPP
8 0 5 3 0 0 0 0 0 0 0 0 0 0 0 3
NLMK0411 Site of Former YMCA Baird St Coatbridge AC 0.11 PRIV OO    Sparkleberry Homes ALPS LAPD 13/00529/FUL,
18/01106/FUL,
20/00232/FUL
10 0 0 10 0 0 0 0 0 0 0 0 0 0 0 10
NLCN1309 Site opposite 2 Kirk Place Cumbernauld CN 0.15 PRIV OO    Mr James Gregg ALPS LAPD 19/00855/FUL 4 0 0 4 0 0 0 0 0 0 0 0 0 0 0 4
NLMK1317 Site to east of 68-102 Gibb
Street
Chapelhall AC 1.59 SR  LA   North Lanarkshire
Council
CONS DETL 21/01580/FUL 25 0 0 25 0 0 0 0 0 0 0 0 0 0 0 25
NLMK1363 Site To The East Of 47
Crawhill Drive
Bargeddie AC 1.43 PRIV OO    Drumpellier Business
Park
CONS OUTL 23/00725/PPP 43 0 0 43 0 0 0 43 0 0 0 0 0 0 43 0
NLSK1312 Site to West of Potassels
Road
Muirhead CN 1.81 PRIV OO    Advance Construction
Scotland
Ltd/Ambassador
Partnership Homes Ltd
CONS OUTL 19/00563/PPP,
24/00242/MSC
32 0 0 32 0 0 32 0 0 0 0 0 0 0 32 0
NLMK0605 South Bridge Street (68-78
Orrs Building)
Airdrie AC 0.07 SR  LA   North Lanarkshire
Council
COMM DETL 08/00909/FUL,
19/01212/FUL
20 0 0 20 20 0 0 0 0 0 0 0 0 0 20 0
NLSK1300 South West of 56 Station
Road
Muirhead CN 0.78 PRIV OO     ALPS LAPD 17/00098/FUL 17 0 0 17 0 0 0 0 0 0 0 0 0 0 0 17
NLMW1369 Springfield Farm (North)
Phase 2
Shotts MW 5.42 PRIV OO    Advance Construction
Scotland
CONS DETL 22/01390/MSC 97 0 0 97 0 35 35 27 0 0 0 0 0 0 97 0
NLMW1336 Springfield Farm (South) Shotts MW 8.22 PRIV OO    Advance Construction
Scotland
CONS DETL 17/00389/PPP,
20/00235/MSC,
22/01390/MSC
149 0 0 149 0 0 0 0 35 35 35 35 9 0 149 0
NLMW1168 Springhill Farm Shotts MW 1.81 PRIV OO    Krystyna Szumelukowa
Ltd for Zoo Asset
Management
ALPS  16/01960/PAN,
17/00020/EIASCR
45 0 0 45 0 0 0 0 0 0 0 0 0 0 0 45
NLSK0441A Stoneyetts - Miller Homes Moodiesburn CN 10.72 PRIV OO    Miller Homes COMM DETL 18/00444/FUL,
21/00529/AMD
173 35 93 80 35 35 10 0 0 0 0 0 0 0 80 0
Page 109 of 154

Page 110

Reference     
Site Name  
Location
HMSA
Site Area
Tenure
Private Tenure
Social Rent Provider
Intermediate
Tenure
AHP    
Landowner/Developer 
Planning Status
Consent     
Application reference
Capacity
2023-24 completions
Total Complete
Remainder/ Established Supply
2024-25 (Short)
2025-26 (Short)
2026-27 (Short)
2027-28 (Medium)
2028-29 (Medium)
2029-30 (Medium)
2030-31 (Long)
2031-32 (Long)
2032-33 (Long)
2033-34 (Long)
Total 10 year
Beyond 10 year
NLSK1340 Stoneyetts - Taylor Wimpey Mollinsburn CN 6.14 PRIV OO    Taylor Wimpey COMM DETL 18/00444/FUL,
21/00529/AMD
121 43 81 40 40 0 0 0 0 0 0 0 0 0 40 0
NLMK1160 Sykeside Road Airdrie AC 0.87 PRIV OO    Houghton Planning Ltd
for McKernan Homes
ALPS   22 0 0 22 0 0 0 0 0 0 0 0 0 0 0 22
NLSK1193A The Neuk Auchinloch CN 0.91 PRIV OO    Parella Homes ALPS  21/01553/FUL 7 0 0 7 0 0 7 0 0 0 0 0 0 0 7 0
NLMW0690 Thorn Road (former Bellshill
Miners Welfar
Bellshill MW 0.44 SR  LA   North Lanarkshire
Council/McTaggart
Construction
CONS DETL 23/00324/FUL 26 0 0 26 0 26 0 0 0 0 0 0 0 0 26 0
NLCN1199A Tollpark Road (Castlecary) Cumbernauld CN 2.00 PRIV OO    Link PROP   40 0 0 40 0 0 0 20 20 0 0 0 0 0 40 0
NLCN1199B Tollpark Road (Castlecary) Cumbernauld CN 2.00 SR  RSL  AHP Link PROP   9 0 0 9 0 0 0 9 0 0 0 0 0 0 9 0
NLMW1338 Torrance Park South East -
Taylor Wimpey Phase 4
Holytown MW 10.23 PRIV OO    Taylor Wimpey UK Ltd CONS DETL 17/00539/PAN,
19/00124/FUL
245 0 0 245 0 25 25 25 25 25 25 25 25 25 225 20
NLMW1164 Torrance Park South West -
Barratt Phase
Holytown MW 11.57 PRIV OO    New Brannock Ltd,
Barratt Homes WS Ltd
COMM DETL 17/00539/PAN,
19/00124/FUL,
21/00405/FUL
287 65 118 169 45 45 45 34 0 0 0 0 0 0 169 0
NLMW1337 Torrance Park West - Taylor
Wimpey Phase 3
Holytown MW 3.38 PRIV OO    Taylor Wimpey UK Ltd COMM DETL 17/00539/PAN,
19/00124/FUL
106 33 76 30 30 0 0 0 0 0 0 0 0 0 30 0
NLMW0199B Treatment Works West New Stevensto MW 1.65 PRIV OO    Robertson Homes Ltd ALPS LAPD 05/00302/FUL 31 0 0 31 0 0 0 0 0 0 0 0 0 0 0 31
NLMW1169 West of 499 Wishaw Road Bogside MW 0.16 PRIV OO    GL Hearn for Margaret
Frame
CONS OUTL 22/01220/PPP 4 0 0 4 0 0 2 0 0 0 0 0 0 0 2 2
NLMW1173 West of Morningside Road Newmains MW 13.87 PRIV OO    Holder Planning for
Robert Hill
CONS OUTL 18/00580/PPP,
23/00649/S42
160 0 0 160 0 0 0 30 30 30 30 30 10 0 160 0
NLMW1174 West of North & South Road
(Bellside)
Cleland MW 1.54 PRIV OO    Godsmark Architecture
Ltd
ALPS   39 0 0 39 0 0 0 15 15 9 0 0 0 0 39 0
NLMK0344 Windsor Drive (Pinwinnie
Recovery Site)
Glenmavis AC 8.09 PRIV OO    Dawn Homes Ltd COMM DETL 18/01851/FUL 146 37 113 33 33 0 0 0 0 0 0 0 0 0 33 0
NLMW1171 Woodhall Road (Victoria Park) Newmains MW 9.28 PRIV OO    John Russell Partnership
for Anderson
Commercial (Newhouse)
Ltd
ALPS  22/01285/EIASCR,
23/00367/FUL
195 0 0 195 0 0 0 30 30 30 30 30 30 15 195 0 
Page 110 of 154

Page 111

North Lanarkshire Council Report
Planning Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref     Date 05/12/24 
Development Plan Scheme & Participation Statement 2024 Update 
From  Pamela Humphries, Chief Officer (Place)  
E-mail laingg@northlan.gov.uk Telephone Gordon Laing,
07970018874 
1. Background 
1.1 The current North Lanarkshire Local Development Plan (NLLDP) was Adopted in July
2022. The NLLDP sets out where development should and should not happen by
guiding the future use of land at a local level. It is also a key consideration in the
decision-making on planning applications.      
Executive Summary
The purpose of this report is to seek Committee approval of the Development Plan Scheme
& Participation Statement (DPS) 2024 update. The DPS outlines the Council’s programme
for preparing and reviewing the new North Lanarkshire Local Development Plan 2
(NLLDP2) and when, how and with whom consultation will take place. 
Recommendations
It is recommended that the Committee: 
1) Agrees the Development Plan Scheme and Participation Statement 2024
2) Notes the consultation undertaken and progress to date in the preparation of the
new North Lanarkshire Local Development Plan 2. 
The Plan for North Lanarkshire
Priority  Enhance participation, capacity, and empowerment across our communities
Ambition
statement
(7) Enhance collaborative working to maximise support and ensure all our
children and young people are included, supported, and safe 
(10) Engage with children, young people, parents, carers, and families to
help all children and young people reach their full potential
(19) Improve engagement with communities and develop their capacity to
help themselves 
(20) Improve the involvement of communities in the decisions, and development
services and supports, that affect them 
Programme
of Work All Programmes of Work
Item 4
Page 111 of 154

Page 112

1.2 Changes to the planning system in Scotland, led by the passing of the Planning
(Scotland) Act 2019 which sets out the future structure of the modernised planning
system, included changes to the arrangements for the preparation of development
plans. Subsequent secondary legislation The Town and Country Planning
(Development Planning) (Scotland) Regulations 2023 and Local Development
Planning Guidance came into force in May 2023.   
1.3 The DPS (including Participation Statement) is an important communication tool which
outlines the Council’s programme for preparing and reviewing the next North
Lanarkshire Local Development Plan (NLLDP2) and when, how and with whom
consultation will take place. The Council has a statutory duty to prepare and publish a
DPS annually.   
1.4 The DPS sets out a timetable which anticipates that NLLDP2 will be on track for
Adoption in advance of the Regulations and Guidance expectation of May 2028. 
2. Report 
2.1 Following the commencement of the Regulations and publication of Guidance in May
2023, the DPS was revised in line with these requirements and the current DPS was
approved by the council in September 2023. This also signalled the start of the new
process for NLLDP2. The Regulations and Guidance were used to help produce an
engagement strategy that is inclusive of all stakeholders and ensures that we are
engaging in the most effective way. 
2.2 As the council is required to update this document annually, an updated Development
Plan Scheme & Participation Statement for 2024 has been prepared. 
2.3 The DPS includes: 
• proposed timetabling, including timings for various key stages of NLLDP2
preparation, to be specified by the proposed year and financial quarter. Key stages
to be covered are: publication of the Evidence Report; publication of the Proposed
Plan; submission of the Proposed Plan to the Scottish Ministers; and expected
adoption of NLLDP2. 
• details of what is involved in each stage; and 
• a Participation Statement, outlining when consultation is likely to take place, with
whom and its likely form, including the steps to be taken to involve the public. 
2.4 Updated timescales 
The first key stage in preparing the new NLLDP2, is gathering of evidence and
submission of an Evidence Report to the Scottish Government for review. Following a
review of other local authority Evidence Reports already submitted to the government,
two local authorities have been given the go-ahead to progress to the next stage
(Proposed Plan) and two have not and will require to re-submit their Evidence
Reports. 
2.5 Having taken time to review these and learn from our partner authorities, we have re-
assessed where additional evidence may require to be gathered and identified
additional consultation. The additional tasks present a challenge in terms of
resourcing these gaps, and therefore it is proposed to extend the timescale in the
DPS for submission of the councils Evidence Report from Jan-Mar 2025 to Jul-Sept
2025. This will allow for a more sufficient evidence base to be gathered and ensure
that effective and meaningful consultation and engagement with all our stakeholders
and communities is carried out. 
Page 112 of 154

Page 113

2.6 Review of progress
The updated DPS includes an appendix outlining what consultation and engagement
has been undertaken to date including providing updates to elected members,
consulting widely on national planning policy topics for the purpose of evidence
gathering, joint working approach with SLC to engage with Gypsy and Travellers
communities and Health boards, updates presented to Access Panel and Voice of
Experience groups, Local Place Plan invitations to prepare issued to community groups
and information sharing session undertaken, newsletter prepared and issued widely
and publicising of the plan shared on social media platforms. 
2.7 Work is ongoing to carry out the remainder of consultation identified within the DPS,
including a Place Standard Survey, engagement with children and young people, and
focussed themed workshops to further enhance the outcomes and understanding of
our evidence gathering. 
2.8 Following Committee approval and adoption of the updated Development Plan Scheme
& Participation Statement for 2024, it will be submitted to the Scottish Ministers,
published online and a copy placed in all North Lanarkshire public libraries. 
3. Measures of success 
3.1  An effective engagement strategy which is inclusive of all our stakeholders, raising
awareness of and opportunity to contribute to the Local Development Plan among
stakeholders, key groups and the public at large. 
3.2  Implementation of a statutory function, as required by the Planning (Scotland) Act
2019.     
4. Supporting documentation 
4.1 Appendix 1 – Development Plan Scheme & Participation Statement 2024 
Pamela Humphries
Chief Officer (Place) 
Page 113 of 154

Page 114

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The appropriate assessments will be carried out alongside preparation of the new
LDP, as noted within the DPS timescales. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Page 114 of 154

Page 115

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 115 of 154

Page 116

Appendix 1 
North Lanarkshire Local Development Plan 2:
Development Plan Scheme and Participation Statement 2024 
Enterprise & Communities
Page 116 of 154

Page 117

1   
Contents
Section1: Development Plan Scheme .................................................................................................................................................................. 2
1 What is a Development Plan Scheme (DPS)? .......................................................................................................................................... 2
2 The Statutory Development Plan for North Lanarkshire ............................................................................................................................ 2
3 Existing Local Development Plan ............................................................................................................................................................. 3
4 New Local Development Plan & Changes ................................................................................................................................................ 3
5 North Lanarkshire Local Development Plan 2 ........................................................................................................................................... 4
6 Timetable changes ................................................................................................................................................................................... 8
Section 2: Participation Statement ....................................................................................................................................................................... 9
1 What is a Participation Statement? ........................................................................................................................................................... 9
2 Our consultation aims .............................................................................................................................................................................. 9
3 Who can participate? ............................................................................................................................................................................. 10
4 When and how will we participate with you? ........................................................................................................................................... 10
5  How would you prefer to be contacted and involved? ............................................................................................................................. 17
6  Mediation ............................................................................................................................................................................................... 18
7  Contact and future participation .............................................................................................................................................................. 18
Glossary ............................................................................................................................................................................................................ 19
Appendix 1 - Progress to date (December 2024) ............................................................................................................................................... 21
Plan Preparation ............................................................................................................................................................................................ 21 
Page 117 of 154

Page 118

2   
Section1: Development Plan Scheme 
1 What is a Development Plan Scheme (DPS)? 
A Development Plan Scheme (DPS) is an important
communication tool which sets out the programme for
the preparation of our next Plan - North Lanarkshire
Local Development Plan 2 (NLLDP2) – and lets
stakeholders know when and how they can get involved
in the plan and keep informed of progress. This is
reviewed and updated annually and is available to view
on the council’s website. The second part of this
document also sets out a Participation Statement,
outlining how, when and with whom the council intends
to engage and consult on NLLDP2. 
2 The Statutory Development Plan for North Lanarkshire 
The Development Plan sets out where development
should and should not happen by guiding the future
use of land at a local, regional and national level.
These plans are a key consideration in the decision-
making on planning applications. 
Development planning in Scotland is undergoing significant change.
Previously, the development plan consisted of the Strategic
Development Plan (Clydeplan Strategic Development Plan) and the
Local (Development) Plan (North Lanarkshire Local Plan 2012) as
well as a suite of Supplementary Planning Guidance notes.
Changes introduced by the Planning (Scotland) Act 2019 statutory
Development Plan now consists of the National Planning
Framework (NPF4) and the Local Development Plan (NLLDP) as
demonstrated in figure 1.
Figure 1. Statutory Development Plan/Related Plans (Local Development
Planning Guidance, The Scottish Government)
Page 118 of 154

Page 119

3   
3 Existing Local Development Plan 
The council adopted the North Lanarkshire Local Development
Plan (NLLDP) in July 2022, replacing the North Lanarkshire Local
Plan 2012. It contains a spatial strategy, proposals map, action
programme for identified developments and schedule of the local
authority’s land interests affected by Plan policies or proposals. It
focuses on specific proposals for the period of 10 years from
adoption. 
NLLDP is integrated with Council and Partner statutory plans and
strategies affecting the development of land. 
The plan also identifies Supplementary Guidance (SG) to
complement existing policy within NLLDP and provide further
guidance on specific topic matters. Planning and Noise SG, 
Affordable Housing SG and Frontiers of the Roman Empire
(Antonine Wall) World Heritage Site SG have been adopted by the
Council and are available online. Education Contributions SG is
currently being prepared by the council. 
4 New Local Development Plan & Changes 
The new development planning system has introduced a new
process for the preparation of LDPs. The Local Development
Planning Guidance 2023 outlines 3 key parts to the Local
Development Plan process (also shown in figure 2 from the
guidance) – 
Evidence Gathering of data and information to inform the plan
followed by a Gate Check by the Scottish Government,
Plan preparation including production of a Proposed Plan and its
Examination, followed by;
Delivery including subsequent adoption of the plan and a Delivery
Programme as well as ongoing monitoring. 
Figure 2. LDP Process – Overview (Fig.4 of Local Development Planning
Guidance, Scottish Government) 
In addition, preparation of Local Place Plans, Strategic
Environmental Assessment and other Appraisals/Assessments are
also important statutory elements of an LDP. 
The requirement for the preparation of strategic development plans
(SDPs) is removed and instead introduces the requirement for
planning authorities, working alone, or in partnership with two or more
planning authorities to form strategic partnerships, to prepare and
adopt a Regional Spatial Strategy. A planning authority must adopt a
Regional Spatial Strategy as soon as practicable after this part of the
Act comes into force and the Government has the power to direct
planning authorities to prepare and adopt such strategies. 
Regional Spatial Strategies will inform the NPF and Local
Development Plans. The NPF and Local Development Plans are to
be prepared at least every 10 years rather than every 5 years.
Page 119 of 154

Page 120

4   
A further significant change is the introduction of the right for
communities to come together and prepare Local Place Plans
(LPPs). Before preparing a Local Development Plan, a Planning
Authority must invite local communities in their district to prepare
LPPs, stating the date by which they must be prepared and details of
the assistance available for local communities to prepare LPPs. In
preparing its LDP the planning authority must have regard to LPPs. 
Other changes introduced by the Act includes requirements for
Development Plans for the carrying out of Play Sufficiency
Assessments and preparation of Open Space Strategies to inform
the LDP. 
5 North Lanarkshire Local Development Plan 2 
Following adoption of the current NLLDP in 2022, preparation is
now underway for NLLDP2. The table below (Table 1: NLLDP2
Indicative Timetable) outlines the proposed key stages alongside
estimated timeframes for completion of each stage and what is
required at each stage. It should be noted that the Gate Check and
Examination process and time to complete each of these are
outwith the council’s control. Annual DPS updates will reflect any
impact of these stages as they are completed.
The stages outlined in Table 1 are those which are identified in the
Scottish Government’s Local Development Planning Guidance. 
Technical Reports & Impact Assessments 
As part of the Evidence Report and its preparation, a wide range of
topics will be covered. This will include preparing a number of
technical reports to support the evidence base. This list of reports
may include, but is not limited to:
SEA Scoping Report
Housing
Infrastructure & Services Capacity
Transport Appraisal
Play Sufficiency Assessment 
Additional assessments will also be undertaken to support the
NLLDP2 preparation. These will help to inform and be informed by
the plan whilst under preparation and includes:
Strategic Environmental Assessment;
Equalities Impact Assessment;
Public Sector Equality Duty Assessment;
Fairer Scotland Duty Assessment; and
Habitats Regulations Appraisal 
Table 1 below includes details of estimated timings for the SEA and
additional assessments.
In preparing the LDP the council will also have regard to the
following plans and strategies:
- the national waste management plan
- the national marine plan
- any regional marine plan
- any river basin management plan
- any flood risk management plan
- any local flood risk management plan
- any regional transport strategy
- any local transport strategy
- any local housing strategy
- any open space strategy;
Page 120 of 154

Page 121

5   
Table 1: NLLDP2 Indicative Timetable (stages as outlined in Local Development Planning Guidance) 
Stage 1 - Evidence Gathering Timetable* SEA Other Assessments
Early Preparation
Development Plan Scheme & Participation Statement preparation and
adoption
Invitation to local communities to prepare LPPs
Start Quarter 2
2023 (July-Sept
2023)  
Evidence Report
Gather and collate appropriate evidence
Seek views of key agencies, children and young people,
and the public at large in the preparation of the Evidence Report.
Prepare Evidence Report
Approval of Evidence Report by full Council
Submission to the Scottish Ministers
Quarter 1 2023
(April- June 2023) –
Quarter 2 2025
(Jul-Sep 2025)
Scoping workshop.
Collect Environmental
Baseline. 
Prepare Scoping
Report. 
Submit Scoping Report
to Consultation
Authorities. 
Gate Check
Scottish Ministers appoint person to assess Evidence Report. Gate
Check of Evidence Report
Requests for further information and / or hearings (where
appropriate)
If evidence considered sufficient, appointed person informs planning
authority and Scottish Ministers
If evidence not sufficient, appointed person prepares “assessment
report”
Quarter 2 2025
(Jul-Sept 2025) –
Quarter 3 2025
(Oct-Dec 2025)  
Page 121 of 154

Page 122

6   
Stage 2 - Plan Preparation Timetable* SEA Other Assessments
Informing the Proposed Plan
Develop spatial strategy incorporating an infrastructure first approach
and considering NPF4 spatial principles
Early engagement (call for ideas)
Site assessment
Start Quarter 1
2025 (April-June
2025)
Identification and
assessment of
reasonable
alternatives 
Site assessment
Undertake
transport appraisal
Proposed Plan (Drafting)
Preparation of Proposed Plan, including Spatial Strategy
Delivery Programme:
- Consult with key agencies, the Scottish Ministers and anyone named
in the Programme during preparation
- Approved by full Council before publication
Proposed Plan approved by full Council.
Start Quarter 1
2025 (April-June
2025)
Assess any local
policies. 
Prepare
Environmental Report.
Prepare required
Assessments (as
outlined above in
section 5)
Publication/Consultation
Publish Proposed Plan, Evidence Report and Delivery Programme
together. 
Consultation:
- 12 weeks statutory minimum
- consult with key agencies and Scottish Ministers
- consult with Central Scotland Green Network Partnership (where
appropriate)
Quarter 1 2026
(April-June 2026)
Consultation on
Environmental Report
alongside Proposed
Plan.
Publish transport
appraisal and
required
Assessments.
Page 122 of 154

Page 123

7   
Modification
Modification of Proposed Plan (where appropriate) and preparation of
Modification Report
TBC if required 
Quarter 2 2026
(July-Sept 2026) -
Quarter 4 2026
(Jan-Mar 2027)
Revise Environmental
Report to reflect
modifications and
undertake further
consultation, if
required.
Revisit and update
assessments as
appropriate.
Examination
Publish Proposed Plan and Modification Report (where appropriate)
Preparation of summary of Unresolved Issues (Schedule 3)
Where unresolved representations, appointment of person to
examine plan
Examination of Proposed Plan
Preparation of Examination Report and Recommendations
Modification of LDP as necessary
Quarter 1 2027
(April-June 2027) –
Quarter 2 2027
(July-Sept) 2027
Amend Environmental
Report as required
following Examination.
Submit amended
Environmental Report
to the Scottish
Ministers. 
Page 123 of 154

Page 124

8   
Stage 3 – Delivery Timetable* SEA Other assessments
Adoption/Publication
Adoption of LDP by planning authority.
Publish LDP
Publish Report on Modifications or ‘Recommended Modifications
Statement’ (where applicable)
Adopt and publish Delivery Programme within 3 months of LDP being
constituted
Quarter 3 2027
(Oct-Dec) –
Quarter 4 2027
(Jan-Mar 2028)
Prepare Post Adoption
Statement. 
Publish Post Adoption
Statement 
Monitoring & Delivery
LDP kept under review – monitor changes in characteristics, monitor
impact of policies / proposals.
Delivery Programme: - kept under review and updated at least every 2
years, or if the Scottish Ministers direct the authority to update it  
Housing Land Audit: - prepared annually by each planning authority
Quarter 1 2028
(April-June 2028) –
ongoing
Monitoring 
* References to a “quarter” are to a quarter of the financial year (April- March) and means a period of three months ending at the end of June (“quarter 1”), at
the end of September (“quarter 2”), at the end of December (“quarter 3”) or at the end of March (“quarter 4”) (The Town and Country Planning (Development
Planning) (Scotland) Regulations 2023) 
6 Timetable changes 
The previous DPS was prepared in 2022. During this time, the
Local (Development Planning) (Scotland) Regulations 2023 and
subsequent Local Development Planning Guidance 2023 came into
force. The content of both has allowed for the DPS to be more
focused in terms of timescales and more clearly identify the
expectations for the preparation of NLLDP2. 
The Council has recently reviewed Evidence Reports from other
local authorities already submitted to the Scottish Government.
This has allowed us to learn from our partner authorities and we 
have re-assessed where additional evidence may require to be gathered and
identified additional consultation. The additional tasks present a challenge in
terms of resourcing these gaps, and therefore the timescale for submission
of the councils Evidence Report has been extended from Quarter 4 2024
(Jan-Mar 2024) to Quarter 2 2025 (Jul-Sept 2025). The overall timescale for
preparation and adoption of the new NLLDP2 remains unaltered.
Page 124 of 154

Page 125

9   
Section 2: Participation Statement
1 What is a Participation Statement? 
Stakeholders, including the wider public, have an important role in
shaping their Plan and their views are an important aspect in the
preparation of the plan. This section will outline when consultation
is likely to take place, who we propose to engage with and how we
propose to undertake it.
2 Our consultation aims 
The North Lanarkshire Framework for Engagement reflects a
commitment to working with communities across a range of
engagement opportunities and approaches.
The updated National Standards for Community Engagement
reflect the developing policy and legislative context for community
empowerment in Scotland. This includes 7 Standards, outlined in
figure 3 as Inclusion; Support; Planning; Working Together;
Methods; Communication; and Impact. These standards can be
used for community engagement to develop a working relationship
between the council and community organisations to achieve
positive outcomes.
Our overall approach to engagement will be shaped by these
standards and we will strive to ensure that we work with all of our
stakeholders to engage in the most suitable way.
This Participation Statement identifies the key stages where we will
undertake consultation in the preparation of NLLDP2. At times there
may also be other significant consultations underway by other 
organisations or other departments within the council. We will aim
to take account of these where possible to reduce consultation
fatigue where the targeted stakeholders would result in a similar
audience to that of the NLLDP2 consultations. 
Figure 3. National Standards for Community Engagement – 7 Standards
Page 125 of 154

Page 126

10 
3 Who can participate? 
The council will aim to involve a wide range of stakeholders in the
preparation of NLLDP2. Figure 4 identifies a range of stakeholders
who we will aim to engage with and involve in the preparation of the
plan. This is not exhaustive and we are keen to involve anyone who
has in interest in the plan. 
4 When and how will we participate with you? 
In Table 2 below we have identified the key consultation stages,
when we will expect them to happen and who we wish to target. We
have also indicated possible engagement methods, however, we
would like you to engage with us by telling us how you would prefer
to be consulted by the council so that we can engage with you in
the most effective way. They greyed-out text indicate those stages
already undertaken. 
As the council progresses through the first stage of NLLDP2
preparation the consultation methods for publicity and engagement
will develop and evolve depending on the nature of topics which
require to be explored and the preferred methods and resources
available for doing so. 
Figure 4: LDP stakeholders         
Communities/
councils
Key groups
e.g. Children
& Young
People
National/
regional
agencies &
other
organisations
Kay Agencies LDP
Stakeholders
NLC internal
services
Businesses/
Investors
Infrastructure/
Service 
Land
Managers &
Developers
Page 126 of 154

Page 127

11 
Table 2: Participation Table 
LDP Stage 1 – Evidence Gathering  
Key Consultation Stage (When)
(For specific timescales see Table 1:
NLLDP2 Indicative Timetable above)
Consultation Type & Purpose Consultees & proposed engagement
methods (How and with whom)
Preparing Development Plan Scheme &
Participation Statement
Inform and involve all stakeholders by
seeking and having regard to views on the
Participation Statement.
Inform stakeholders that preparation for
NLLDP2 is underway. 
Consideration of online platforms/hub
for holding information in an easily
accessible location for engagement
and participation throughout all stages
of NLLDP2.
• Consult stakeholders via council
social media platforms, council
website and email contacts on how to
involve them.
• Consultation with community boards.
• Issue request for those interested to
register for updates via GovDelivery.
• Provide dedicated webpage for
consultation responses and further
LDP information.
• Finalise Development Plan Scheme &
Participation Statement and publish
online and hard copies in libraries.
Inviting communities to prepare a Local
Place Plan
Inform/involve community bodies by inviting
to prepare a local place plan as a means of
involvement in the preparation of the Local
Development Plan.
• Issue invitations to prepare Local
Place Plans to community councils
and Community Bodies.
• Provide information and contacts for
communities on a dedicated Local
Place Plans webpage and publicise.
Preparing the evidence report Undertake early and proactive engagement
with stakeholders as outlined in figure 4 (LDP
Stakeholders) on page 9 to ensure
collaborative and transparent evidence
gathering in the preparation of the Evidence
Report. 
Seek views of key agencies, key groups
(such as children and young people, older
people, Gypsies and Travellers, disabled
persons/groups) and the public at large in
the preparation of the Evidence Report.
• Consult and update stakeholders via
council social media platforms,
council website and email contacts.
• Internal council services and elected
member engagement to gather
views/issues and available data and
information via workshops and
meetings.
• Engage with key agencies,
organisations, and other stakeholders
to agree and gather key evidence.
Possible meetings and/or workshops  Page 127 of 154

Page 128

12   
online or in-person. Grouping of
particular topics may be helpful.
• Engage with community boards,
community councils and community
groups to include their views about
local places and assist aligning LDP/
LPP engagement. Use of online
platforms and meetings/workshops
as required alongside possible use of
toolkits (such as Place Standard) to
assist conversations and record
information about local areas when
consulting.
• Target specific key groups (including
children and young people, older
people, Gypsies and Travellers,
disabled persons/groups) to update
on process and preparation of new
LDP and capture views. Use of online
platforms and meetings/workshops
where required alongside possible use
of toolkits (such as Place Standard) to
assist conversations and record
information about local areas when
consulting.
• Joint working with South Lanarkshire
Council to reduce consultation fatigue
and share resources/best practice. 
• Present to Developer Forum to
update and raise awareness of the
process.
• Use social media and council’s
website to publicise and update on
progress and  provide key documents/
information. Email to those registered
for updates via GovDelivery.
Page 128 of 154

Page 129

13   
Gate Check  Submit Evidence Report for gate check
process. The appointed person leading
the gate check may consult with certain
stakeholders either in writing or through a
hearing (this is only a consult where
necessary stage).
No consultation by the council at this stage
though submission of the Evidence Report     
and outcome of the gate check will be
publicised online using the webpage, social
media and an update emailed out to
participants. Publish Evidence Report online. 
The council will also take the opportunity to
review the consultation and engagement
methods used with a view to improve and
adapt these where necessary for the next
stage of NLLDP2 preparation and
consultation. 
Page 129 of 154

Page 130

14   
LDP Stage 2 – Plan Preparation  
Key Consultation Stage & Quarter
(When)
Consultation Type & Purpose Consultees & proposed engagement
methods (How and with whom)
Preparing the Proposed Local
Development Plan
Develop a spatial strategy building on the
Evidence Report and undertake a Call for
Ideas with all stakeholders to identify ideas
and sites for consideration for the Proposed
Plan.
• Consult and update stakeholders via
council social media platforms,
council website and email contacts
• Issue a call for ideas to stakeholders,
to include an online consultation for
identifying ideas/sites and submitting
relevant context.
• Engage with internal services,
members and external stakeholders
including those that are statutory and
identified as key groups using
workshops/meetings and online/digital
resources.
• Promote/facilitate the participation of
young people including schools,
youth councils and youth parliament
representatives.
Consulting on the Proposed Local
Development Plan
Publish the Proposed Plan (as well as
Delivery Programme) and seek formal
consultation responses.
• Consult and update stakeholders
via council social media platforms,
council website and email contacts
• Consult for a minimum of 12 weeks
on the Proposed Plan, proposed
Delivery Programme and
Environmental Report.
• Publish accompanying assessments
including Equalities Impact
Assessment, Public Sector Equality
Page 130 of 154

Page 131

15   
Duty Assessment, Fairer Scotland
Duty Assessment, Strategic
Environmental Assessment; and
Habitats Regulations Appraisal.
• Inform and consult with stakeholders
and communities on the proposed
plan allowing them to respond to the
content of the plan. Possible
events/meetings to publicise and
present the proposed plan.
• Undertake neighbour notification of
sites proposed for development.
• Consult with Key Agencies and the
Scottish Ministers.
• Consult directly with Central Scotland
Green Network Partnership (aims
currently being delivered by Green
Action Trust).
• Publish in local newspaper and
online. Copies available in a planning
authority office and public libraries in
NLC.
Modifying the Proposed Local
Development Plan and Examination
Following the consultation period,
modifications can be made to the Proposed
Plan. This can take account of:
• representations made;
• any matters arising from consultation with
key agencies and the Scottish Ministers; and
• any minor drafting or technical matters.
• Issue an update on plan progress to
all stakeholders and publish any
Modification Report.
• Advertise upcoming Examination in a
local newspaper and public libraries
and notify anyone who made
representations during the formal
consultation on the Proposed Plan.
• The form of the Examination is at the
discretion of the appointed person, for
example it may be in public, a hearing
or written submissions.
Page 131 of 154

Page 132

16   
LDP Stage 3 – Delivery (of the Plan)  
Key Consultation Stage & Quarter
(When)
Consultation Type & Purpose Consultees & proposed engagement
methods (How and with whom)
Adopting the Local Development Plan Inform people that the Local Development
Plan has been adopted.
Following adoption of NLLDP2:
• send two copies to the Scottish
Ministers;
• publish it;
• place a copy in any local public
libraries;
• notify anybody who commented on
the Proposed Plan; and
• place an advert in a local newspaper 
• Publish notification of Delivery
Programme and make copies
available (within 3 months of NLLDP2
adoption). 
*Greyed out text is consultation/engagement that has already been undertaken.
Page 132 of 154

Page 133

17   
5 How would you prefer to be contacted and involved? 
Table 2 above includes various proposed methods of engagement
and publicising. Figure 5 pulls together a list of these suggested
methods that we may use to keep you up to date and to consult
with you on the preparation of NLLDP2.
This is not exhaustive and whilst they are our suggested methods,
we welcome feedback how best to engage with you during the
preparation of NLLDP2.
We will aim to ensure that we will publicise key stages of NLLDP2
preparation as widely as possible, thereby informing the public at
large of key consultation stages to be able to have views on and
input to the Plan. Resources may also influence both input to the
plan by stakeholders and the methods used to engage.
Whilst more modern methods of engaging and providing information
are increasingly undertaken online, it is recognised that not
everyone may wish to engage in that way or indeed readily have
access to such facilities. We will endeavour to provide alternative
methods of consulting and engaging where possible. 
Figure 5: Contact methods
Our dedicated webpage for LDP2 will contain up-to-date
information and will provide an interactive method for
engaging
Social media platforms including Facebook and Twitter to
post updates throughout the plan preparation process and
links to further information
Email for updates and invite to participate. Sign up for updates
from NLC planning service here -
www.public.govdelivery.com/accounts/UKNLC/subscriber/new
Workshops & meetings can be set up at convenient times and
locations to present face-to-face and have discussions
Adverts will be placed in local newspapers at key stages in the
plan process as well as documents placed in libraries
Open drop-in or specific stakeholder events may be a method
of engaging with the general public or targeted groups
A more specific or targeted approach may be required for
certain harder to reach groups
Page 133 of 154

Page 134

18   
6 Mediation 
The Planning (Scotland) Act 2019 introduced powers for mediation.
Mediation can involve a range of techniques and is used to help
build bridges between stakeholders and resolve issues of dispute. It
is a voluntary process, generally between two parties, which can be
facilitated by a third, independent party.
Any requests for mediation will be considered and where necessary
have regard to such requests in preparing the Participation
Statement. Any potential use of mediation will be considered by the
council, having regard to the issue at hand and the possible
benefits of the mediation and the involvement of other parties. 
7 Contact and future participation
You can contact us at: localdevelopmentplan@northlan.gov.uk
If you would like to be kept up to date on the plan as well as other
aspects of the NLC planning service, please register here.
For further information about the Local Development Plan please
visit our website at www.northlanarkshire.gov.uk/planning-and-
building/development-plans
Page 134 of 154

Page 135

19   
Glossary
Delivery Programme
A document, approved by full council, which sets out how the LDP
will be delivered. 
Development Plan
The statutory basis of planning decision making, comprising NPF4
and the LDP. 
Development Plan Scheme (DPS)
A document setting out the planning authority's programme for
preparing and reviewing their LDPs. It is a statutory document and
communication tool that lets stakeholders know when and how they
can get involved in the plan and keep them informed of progress. It
must contain a Participation Statement (see below). 
Local Development Plan (LDP)
A local development plan (LDP) is a plan in which it is set out, for
land in the part of the district to which it relates:
a spatial strategy, being a detailed statement of the planning
authority's policies and proposals as to the development and use of
the land;
such other matters as may be prescribed; and
any other matter which the planning authority consider it appropriate
to include. It forms part of the statutory development plan. 
Local Place Plans
LPP is a community-led plan setting out proposals for the
development and use of land and a community’s aspirations for its 
future development. Once registered they are to be taken into account in the
preparation of the relevant LDP. 
National Planning Framework (NPF)
Scotland’s fourth National Planning Framework (NPF4) is a long term plan
looking to 2045 that guides spatial development, sets out national planning
policies, designate national developments and highlight regional spatial
priorities. It is part of the development plan, and so influences planning
decisions across Scotland. 
Open Space Strategy (OSS)
An open space strategy is to set out a strategic framework of the planning
authority’s policies and proposals as to the development, maintenance and
use of green infrastructure in their district, including open spaces and green
networks. It must contain; an audit of existing open space provision, an
assessment of current and future requirements, and any other matter which
the planning authority consider appropriate. 
Participation Statement
A document setting out the plan for engagement in the plan making process,
including when consultation is likely to take place, with whom and its likely
form. This will include the steps to be taken to involve the public at large. 
Play Sufficiency Assessment (PSA)
A play sufficiency assessment is the assessment of the sufficiency of play
opportunities for children in their area, carried out by a planning authority
under the duty as set out in Section 16D(1) of the
Page 135 of 154

Page 136

20   
Town and Country Planning Scotland Act 1997, as amended. Must be done by the planning authority in preparing an Evidence Report. 
Regional Spatial Strategy (RSS)
A long-term spatial strategy in respect of the strategic development of an area (or areas). It must specify the region it relates to and identify, in relation to
the region:
the need for strategic development;
the outcomes to which the authority (or authorities) consider that strategic development will contribute;
priorities for the delivery of strategic development; and
proposed locations for strategic development, which must be shown in the strategy in the form of a map or diagram. 
Strategic Environmental Assessment (SEA)
Strategic environmental assessment is a procedure to assess the environmental impact and sustainability of a proposed or existing policy, plan, or
programme. 
Page 136 of 154

Page 137

21   
Appendix 1 - Progress to date (December 2024) 
Plan Preparation
With reference to Table 1 above, the council has completed Stage 1, 'Early Preparation.' This stage involved preparing the first Development Plan Scheme
and Participation Statement in 2023 for the new North Lanarkshire Local Development Plan 2. Additionally, we have invited community groups to prepare
a Local Place Plan. 
Progress is well underway for Stage 2, the 'Evidence Report.' The Council is identifying and assessing evidence-related topic papers for each policy area
outlined in NPF4 and the Scottish Government's Local Development Planning Guidance. This ongoing exercise allows stakeholders to confirm whether we
have identified the most relevant evidence and to provide any additional evidence they wish us to consider. Further engagement and consultation with
stakeholders to collate, discuss, and agree on the evidence is ongoing. 
Table 3 Engagement and Consultation Completed below shows what exercises have been undertaken to date.  All of this will help to inform the Evidence
Report for submission to the Scottish Government in 2025. Further consultation still to take place includes issuing and publicising of a Place Survey,
engagement with Youth Councillors/Youth Parliament/schools and workshops with stakeholders on key topics to further progress our evidence
gathering and ensure all stakeholders are included.     
Table 3: Engagement & Consultation Completed  
Dates  Engagement Activity  Venue/Method Groups and Organisations 
September
2023    
Joint NLC/SLC Gypsy & Travellers
community engagement 
Hamilton  Gypsy & Travellers community, MECOPP,
Scottish Government, NLC/SLC 
Nov 2023 Development Plan Scheme &
Participation Statement 2023
approved 
Online/Email/Social Media  Wide consultation via social media,
GovDelivery, community groups, community
boards in preparing the DPS/PS
March 2024 Invitation to prepare Local Place
Plans issued and links shared to
online information and sources 
Online/Email/Social Media Community Councils, community groups,
Community Boards, Gov Delivery. 
April 2024 NLLDP2 Newsletter 1 published Online/Email Sent to key agencies/infrastructure providers,
internal contacts, Community Boards,
community groups, GovDelivery, Yammer
(internal), Elected Members
April 2024 Self-build Housing register -
information published online/link
sent out with newsletter update
Online/Email Publicised via social media and GovDelivery 
Page 137 of 154

Page 138

22   
May 2024 Presentation to elected members
on NLLDP2 key stages and update 
Civic Centre, Motherwell  NLC Elected Members
May 2024 Engaged with Gypsy & Travellers
community 
Hamilton MECOPP/ Scottish Government/
COSLA/NLC/SLC
August 2024 Joint NLC/SLC Health & Wellbeing
event 
Civic Centre, Motherwell  NHS Lanarkshire, PHS, HSCP, NLC/SLC
June 2024 -
ongoing
Updates provided to Access Panel
as and when required 
Attendance at monthly
Access Panel meetings 
Access Panel 
May - June
2024
NPF4 related Topic Surveys Batch
1 published online for six weeks to
assist evidence gathering 
Online/Email/GovDelivery Survey sent to stakeholders including elected
members, key agencies, infrastructure
providers, community groups/Community
Boards and published online and shared via
social media platforms and GovDelivery. 
June-July 2024 NPF4 related Topic Surveys Batch
2 published online for six weeks to
assist evidence gathering
Online/Email/GovDelivery Survey sent to stakeholders including elected
members, key agencies, infrastructure
providers, community groups/Community
Boards and published online and shared via
social media platforms and GovDelivery.
July-Aug 2024 NPF4 related Topic Surveys Batch
3 published online for six weeks to
assist evidence gathering
Online/Email/GovDelivery Survey sent to stakeholders including elected
members, key agencies, infrastructure
providers, community groups/Community
Boards and published online and shared via
social media platforms and GovDelivery.
Sept-Oct NPF4 related Topic Surveys Batch
4 published online for six weeks to
assist evidence gathering
Online/Email/GovDelivery Survey sent to stakeholders including elected
members, key agencies, infrastructure
providers, community groups/Community
Boards and published online and shared via
social media platforms and GovDelivery.
Sep-Oct 2024 Landowner/housebuilder/developer
survey consultation
Online survey  Survey (prepared with Homes for Scotland)
issued to
landowners/housebuilders/developers
Oct 2024 Local Place Plan information
sharing event held with community
groups
Face-to-face session Community groups/Nick Wright Planning/NLC
Page 138 of 154

Page 139

23   
Nov 2024 Update provided to Voice of
Experience group 
Attendance at VoE
meeting
Voice of Experience 
Page 139 of 154

Page 140

Page 140 of 154

Page 141

North Lanarkshire Council
Report
Planning Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref     Date 05/12/24 
Update to the Procedure for Dealing with Legacy Planning
Applications 
From  Pamela Humphries, Chief Officer (Place)  
E-mail bowdenl@northlan.gov.uk Telephone Lorna Bowden 
Tel: 07939280460 
1. Background 
1.1 One of the measures of planning performance measured by the Scottish Government
through the annual Planning Performance Statistics is the number of legacy cases a
planning authority is dealing with. A legacy case is any application which is more than
one-year-old. Each year the service is required to report on the number of cases
cleared and the number of cases remaining. 
Executive Summary 
This report sets out an updated procedure for handling existing and future applications
which have an interim “minded to grant” decision subject to the conclusion of a required
legal agreement. It puts forward arrangements which will reduce delays in concluding legal
agreements before planning permission decision notices can be issued and improve the
Council’s performance figures. 
This procedure was previously approved by Committee in February 2022, however, in the
light of recent legal advice the procedure requires to be refreshed. 
Recommendations 
It is recommended that the Planning Committee approves the proposed procedures set
out in in the report for dealing with Legacy cases.  
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (4) Market and promote North Lanarkshire as the place to live,
learn, work, invest, and visit
Programme of Work Transforming Places
Item 5
Page 141 of 154

Page 142

1.2 One of the main reasons for applications taking more than one year for a decision to
be issued is that the application has been considered by the Committee or by the
authorised officer and the decision is minded to grant, subject to the applicant entering
into a legal agreement with the Council. Frequently these legal agreements take some
time to be concluded, and, in some rare cases, the applicant does not conclude the
agreement at all. 
1.3 As an application is not formally determined until a decision notice granting or refusing
planning permission is issued, these delays cause uncertainty over whether a
development will take place and when it will be undertaken. 
2. Report 
2.1 The Scottish Government sets targets for the time taken to determine different types of
planning applications and it requires Local Authorities to demonstrate that they have
taken steps to reduce the number of applications which have not been determined for
several years. 
2.2 As can be seen in the annual performance report for the Planning Service for 2023/24,
there are currently 68 legacy cases sitting with the service and 8 of these are awaiting
legal agreements being signed off, none of which are older than one year. The
remainder are dormant applications that have been undetermined for more than 12
months and which the applicant has declined to withdraw when requested. 
2.3  In February 2022 the Committee approved the introduction of a procedure for
addressing the problem of existing applications which remain “minded to grant” subject
to the conclusion of a required legal agreement. This procedure which required legal
agreements to be concluded within a six-month period. Thereafter the report will be
sent back to the committee with a likely recommendation that the application be refused
or, if it was a delegated decision, the application will be refused. The 6-month period to
conclude the agreement is only extended in exceptional circumstances and at the
Planning and Place Manager’s discretion.  Along with the introduction of a standard
template for legal agreements has assisted in reducing the number of cases with
outstanding legal agreements. This procedure has helped to reduce the number of
cases where there is an unsigned legal agreement. 
2.3 Undetermined Legacy Applications 
2.3.1 As the Committee knows, as a Service we will work with applicants to make their
applications acceptable and in some cases, this can prolong the determination
timescale. However, there are a number of legacy applications lying dormant because
the applicant has not agreed to update the supporting information needed to allow the
application to be fully considered. 
2.3.2 An exercise has been carried out where applicants have been contacted and asked to
enter into a Planning Processing Agreement to set out when the required information
will be submitted, or alternatively to withdraw their application. Where the applicant has
failed to agree to either of these steps their application will now be determined on the
basis of the information currently held, which may result in the application being
recommended for refusal on the basis that insufficient information is available. This will
be particularly significant for those applications submitted prior to 13 February 2023
when NPF4 was introduced as part of the Development Plan, as some applications that
might have been in accordance with the previous Development Plan will now fail to
meet the terms of the new policy framework. 
Page 142 of 154

Page 143

3. Measures of success 
3.1 The measures of success would be the reduction in legacy cases which will improve
the council’s performance in relation to legacy cases and help provide greater certainty
regarding likely future development   
4. Supporting documentation 
None 
Pamela Humphries
Chief Officer (Place) 
Page 143 of 154

Page 144

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 144 of 154

Page 145

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 145 of 154

Page 146

Page 146 of 154

Page 147

North Lanarkshire Council
Report
Planning Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    LB Date 05/12/24 
Planning and Place Performance Report 2023/24 
From  Pamela Humphries, Chief Officer (Place)  
E-mail bowdenl@northlan.gov.uk Telephone 07939 280460 
1. Background 
1.1 The Committee will be used to seeing the annual Planning Performance Framework
(PPF) reports where we reported our performance on an annual basis. These reports
were voluntary based on an agreement between the Scottish Government and the
Heads of Planning Scotland (HOPS). The Planning (Scotland) Act 2019 introduced
mandatory national performance monitoring and to oversee this process and to provide
the planning authorities with advice on how to improve the performance of their
functions, the role of National Planning Improvement Co-ordinator (NPIC) has been
created within the Improvement Service. 
1.2 The Planning Improvement Co-ordinator was appointed in September 2023 and has
been collaborating with HOPS, planning authorities and other stakeholders to develop
a suitable mechanism for implementing change. The priority has been to develop a new
performance and improvement model that will build upon the lessons learned from
Planning Performance Frameworks. Given this, a new National Planning Improvement
Framework (NPIF) is being piloted. The key principles of NPIF are: 
Executive Summary
The Planning (Scotland) Act 2019 introduced statutory reporting of the performance of
Planning Authorities. This report seeks to inform the Committee of the feedback from the
National Planning Improvement Coordinator on the outcome of the submission of the
Planning and Place Service as part of the new National Planning Improvement Process
and to update on the performance of the service against the key performance indicators
for 2023-24. The report also sets out the improvement actions that the service has identified
to focus on in the coming period. 
Recommendations
It is recommended that the Committee consider the content of this report and endorse the
actions being taken to improve performance and service delivery.  
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement All ambition statements
Programme of Work Transforming Places
Item 6
Page 147 of 154

Page 148

• A renewed focus on improvement. NPIF aims to use planning authorities’ self-
assessment to identify areas of improvement to inform an improvement action plan. 
• Peer Collaborative Review. Scottish Government marking will be replaced by peer
review involving NPIC, other planning authorities and stakeholders. 
• Measuring quality. NPIF looks to incorporate indicators that better assess
impacts, outcomes achieved, and the quality of the service provided. 
• A high performing planning authority. NPIF focusses on assessment against the
attributes of a high performing planning authority such as: having the tools to do the
job; engagement; people; culture; and place. 
• Recognising dependencies. NPIF aims to recognise that planning authorities
depend on other people and organisations in delivering their service. 
• Resources. NPIF has been designed to be proportionate and not add to the
demand on planning authorities’ resources. 
1.3 As this is a new concept for planning authorities, the approach taken has been for
authorities to pilot developing their new National Planning Improvement Frameworks
and improvement action plans in three tranches over 2024/25. Ten volunteers took part
in the first pilot group of authorities. Through this stage North Lanarkshire was
partnered to work with Fife Council looking at sharing best practice. We have now
completed this exercise and have received our feedback from the NPIC on our
improvement action plan for 2024-25. The feedback confirmed the improvement action
plan has been endorsed, and our new National Planning Improvement Framework is
now published online. 
1.4  The Scottish Government continues to publish Planning Application Statistics and the
figures for the performance of the service are detailed in section two, below. 
2. Report  
Key roles and responsibilities 
2.1 The Planning Service is part of the Place Service and is established to: 
• Deliver a wide range of statutory planning functions including the Local
Development Plan, assessing applications for new development, and facilitating
place change. 
• Enable economic growth, further community wealth building, and protect and
enhance North Lanarkshire’s built and natural environment. 
• Deliver some non-statutory planning functions, including planning enforcement. 
2.2 The service has a key role in supporting delivery of The Plan for North Lanarkshire by
facilitating new development to grow the council’s economic base. 
Performance KPIs 
2.3 Every year the Scottish Government publishes statistics for the 34 Planning authorities,
and these were produced in November 2024 for the 2023/24 reporting period. Table 1
shows our performance in the key outcomes for Development Planning.   
Page 148 of 154

Page 149

Table 1: National Headline Indicators - Development Planning 
Development Planning  2022-23  2023-24
Local and Strategic Development Planning:    
Age of local development plan(s) at end of
reporting period 
Requirement: less than 5 years 
9 months  1 year 9 months
Will the local development plan(s) be replaced
by their 5th anniversary according to the current
development plan scheme?  
Y  Y
Has the expected date of submission of the
plan to Scottish Ministers in the development
plan scheme changed over the past year?  
N  N
Were development plan scheme
engagement/consultation commitments met
during the year?  
N/A  Y
Effective Land Supply and Delivery of
Outputs1 
Housing approvals   730 units  884 units
Housing completions over the last 5 years   5,230 units  5,261 units  
Marketable employment land supply   466.29 ha  441.10 ha
Employment land take-up during reporting year  5.99 ha  5.13 ha  
2.4 Table 2 shows the Development Management performance of North Lanarkshire in
comparison to the Scottish average. Where no figure is given, the Scottish Government
has not published a national figure. 
Table 2: National Headline Indicators Key outcomes – Development
Management 
Development Management:  2022-23  2023-24 2023-24
Scottish Average
Project Planning     
Percentage and number of applications subject to
pre-application advice 
18.2%  7.9% 
Percentage and number of major applications
subject to processing agreement 
53.3% (8)  88.9% (9) 47.1% (107)
Decision Making     
Application approval rate  97.1%  96.6% 92.3%
Delegation rate  95.8%  97.1% 96.5%
Validation  60.1%  42.1% 
Page 149 of 154

Page 150

Decision-making Timescales     
Major Developments  19.4
weeks 
9.8 weeks 36.1 weeks
Local developments (non-householder)  7.3
weeks 
7.1 weeks 11.6 weeks
Householder developments  6.6
weeks 
5.8 weeks 8.3 weeks
Legacy Cases     
Number cleared during reporting period  33  32 
Number remaining   48  75 
2.5 Table 3 shows the performance of the Planning Service when it comes to appeals.
Where appeals are to the Scottish Ministers the percentage of cases where the
Reporter upheld the decision of the Planning Committee is significantly higher than
the Scottish average, however, the percentage of delegated decisions upheld by the
Local Review Body decreased in 2023-24 and was lower than the national average.
Table 3: Decision-making: local reviews and appeals (**SG annual stats) 
Original decisions upheld  2023-24
National
statistics 
2022-23 2023-24 Total no.
2023-24
Type No. % No.  %  %
Local reviews  5  45.5%  5 40.0% 12 59.2%
Appeals to Scottish
Ministers 
3  42.9%  7 85.7% 8 53.9%
**Local Review Bodies dealt with 566 cases nationally in 2023/24. The original
decision was upheld in almost two-thirds of cases (59.2%). 
Service priorities for 2024/25 
2.6  The service will continue to work to implement improvements across all performance
indicators, as stated in paragraph 1.3 above, and to implement our improvement action
plan. This improvement action plan has been developed with the assistance of a peer
review group made up of a range of customers and the Convener of Planning and
endorsed by the NPIC. 
2.7 Overall, the performance of the service is considered to be good, but it has been
identified that there are some areas where there is opportunity for development, and
these are the focus of our improvement action plan for the 2024/25 period. Work on
these actions is already well underway. 
2.8 We identified the following actions as our key priorities in the coming year: 
• Introduce peer review on stagnant cases to establish solutions that could enable
decision making. Page 150 of 154

Page 151

• Continue with our workforce planning by continuing to create opportunities for staff
development and progression that will strengthen the team and prepare for future
challenges, including the introduction of a graduate trainee planning post.  
• Realign existing staff structure to resource a new ‘Invest’ team that will take a
multidisciplinary and phased approach to providing preapplication planning, roads,
environmental health, business support and council land ownership advice and
support for key projects.
• Create planning officer working group to support the implementation of service
improvement actions and the delivery of the National Planning Improvement
Framework.
• Implement Elected Members training in accordance with new legislation.
• Work with partners, peer and national groupings to identify best practice to achieve
best value in the efficient sharing and use of evidence for development
implementation of North Lanarkshire Local Development Plan2.
• We will participate in the national customer survey and analyse the results to allow
us to prepare an improvement action plan.
• Looking at feedback given through peer collaborative review, we will engage further
with applicants, consultees and community organisations to develop an
engagement strategy that will help us ensure we can share information, advice and
feedback in a way that is tailored to suit customer and stakeholder needs and
expectations. 
3. Measures of success 
3.1 The measures of success are not only in relation to the performance indicators that
are set out in the tables in this report but are also more qualitative in terms of
ensuring that the Planning service, through its engagement with applicants and other
stakeholders, contributes to the delivery of good quality development in the right
locations that facilitate delivery of The Plan for North Lanarkshire and the council’s
Local Development Plan.     
4. Supporting documentation  
National Planning Improvement Framework 2023/24 (this includes the improvement action
plan for 2024/25) 
Scottish Government Planning Applications Statistics 2023/2024 
Pamela Humphries
Chief Officer (Place) 
Page 151 of 154

Page 152

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)?  Page 152 of 154

Page 153

Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 153 of 154

Page 154

Page 154 of 154