25 August 2026 
Members of the 
Planning Committee
Chief Executive’s Office
Rachel Blair
Chief Officer (Legal, Democratic and Strategy)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Planning Committee is to be held in the Council
Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Thursday, 03
September 2026 at 10:00 AM which you are requested to attend. 
The agenda of business is attached. 
Rachel Blair
Chief Officer (Legal, Democratic and Strategy) 
Members : 
Clerk Name: Clare Louise McDonald
Clerk Telephone: 07350 435308
Clerk Email: committee@northlan.gov.uk 
N Shevlin, G Currie, A Beveridge, B Burgess, A Bustard, J Cairns, M Coyle, S Coyle, K
Docherty, A Duffy-Lawson, T Fisher, M Hughes, L Jarvie, T Johnston, J Keltie, J Logue, H
Loughran, J McLaren, C McManus, M McPake, A McVey, D Robb, A Smith, G Woods.  
Page 1 of 48

Page 2

Page 2 of 48

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000 
2 Planning Applications Index
Submit Planning Application Index 
5 - 48 
Page 3 of 48

Page 4

Page 4 of 48

Page 5

North
Lanarkshire
Council 
Planning Applications for consideration     
of Planning Committee 
Committee Date: 3rd September 2026 
Ordnance Survey maps reproduced from Ordnance Survey
with permission of HMSO Crown Copyright reserved 
Item 2
Page 5 of 48

Page 6

APPLICATIONS FOR PLANNING COMMITTEE 
3rd September 2026 
Page No Application No  Applicant Development/Site Recommendation
7 26/00093/FUL Skipness Road
Developments Ltd
New Retail Development
including Car Parking and
Service Access
Land to the North of
5 Skipness Road
Gartcosh  
Grant
28 26/00528/FUL Revolution Spin Change of Use of Unit to
Use Class 11: Leisure and
Recreation for Use as a
Fitness Cycle Studio
1 Badenheath Place
Westfield
Cumbernauld
G68 9HX
Grant 
37  26/00602/FUL  Meadowfield
Fishery 
Formation of a
Smallholding with a
Residential Lodge
Land at
Meadowfield Road
Longriggend   
Refuse     
Page 6 of 48

Page 7

Application No:  
26/00093/FUL
Proposed Development: 
New Retail Development including Car Parking and Service
Access 
Site Address: 
Land To The North Of
5 Skipness Road
Gartcosh
North Lanarkshire 
Date Registered: 
6th February 2026 
Applicant:
Skipness Road Developments Ltd
Salisbury House
Saxon Way
Hessle
East Yorkshire
HU13 9PB 
Agent:
Charles Scott And Partners
Tay House
300 Bath Street
Glasgow
G2 4JR 
Application Level:
Local Application 
Contrary to Development Plan:
No
Ward:   
06 Gartcosh, Glenboig And Moodiesburn 
Greg Lennon,Michael McPake,Joanne Katy Keltie,
Representations:
27 letter(s) of representation received.   
Recommendation: Approve Subject to Conditions 
Reasoned Justification: 
The proposed development is in accordance with the relevant policies contained in National
Planning Framework 4 and the North Lanarkshire Local Development Plan 2022 and will deliver
local retail provision which is required to support the wider Community Growth Area as well as
provide a high quality development appropriate to the surrounding area. 
Page 7 of 48

Page 8

Reproduced by
permission of the
Ordnance Survey on
behalf of HMSO. ©
Crown Copyright and
database right 2009.  All
rights reserved.
Ordnance Survey
Licence number
100023396.
Planning Application: 26/00093/FUL 
Name (of applicant): Skipness Road
Developments Ltd
Site Address: Land To The North Of
5 Skipness Road
Gartcosh
North Lanarkshire 
Development: New Retail Development
including Car Parking and Service
Access   
Page 8 of 48

Page 9

Proposed Conditions:- 
1. That, except as may otherwise be agreed in writing by the Planning Authority, the development shall
be implemented in accordance with drawing numbers:-           
1720-HLA-XX-XX-DR-L-90-001 E 
C011C 
C018A 
C012 
A001 
A002
A003
A100
A101
A102
C001
C002
C012
C014
C015
C016 
Reason: To clarify the drawings on which this approval of permission is founded. 
2. That BEFORE the development hereby permitted starts, a scheme of landscaping shall be submitted
to, and approved in writing by the Planning Authority, and it shall include:- 
(a) details of any earth moulding and hard landscaping, boundary treatment, grass seeding and turfing;
(b) a scheme of tree and shrub planting, incorporating details of the location, number, variety and size
of trees and shrubs to be planted;
(c) an indication of all existing trees and hedgerows, plus details of those to be retained, and measures
for their protection in the course of development
(d) a detailed timetable for all landscaping works which shall provide for these works being carried out
contemporaneously with the development of the site 
Reason: In the interests of visual amenity and biodiversity. 
3. That all works included in the scheme of landscaping and planting, approved under the terms of
condition 2 above, shall be completed in accordance with the approved timetable, and any trees,
shrubs, or areas of grass which die, are removed, damaged, or become diseased, within two years of
the full occupation of the development hereby permitted, shall be replaced within the following year
with others of a similar size and species. 
Reason: In the interests of visual amenity and biodiversity.
4. That BEFORE any works of any description start on the application site, unless otherwise agreed in
writing with the Planning Authority, a comprehensive site investigation report shall be submitted to and
for the approval of the said Authority.  The investigation must be carried out in accordance with current
best practice advice, such as BS 10175 : 'The Investigation of Potentially Contaminated Sites' or CLR
11.  The report must include a site specific risk assessment of all relevant pollution linkages and a
Page 9 of 48

Page 10

conceptual site model.  Depending on the results of the investigation, a detailed Remediation Strategy
may be required. Information on the required format of the report and how it should be submitted to
us can be found online: https://www.northlanarkshire.gov.uk/planning-and-building/planning-
applications/how-discharge-contaminated-land-planning-conditions 
Reason: To establish whether or not site decontamination is required in the interests of the amenity
and wellbeing of future users. 
5. That any remediation works identified by the site investigation required in terms of Condition 4, shall
be carried out to the satisfaction of the Planning Authority.  A certificate (signed by a chartered
Environmental Engineer) shall be submitted to the Planning Authority confirming that any remediation
works have been carried out in accordance with the terms of the Remediation Strategy. 
Reason: in the interests of the amenity and wellbeing of future users
6. That BEFORE the development hereby permitted starts, unless otherwise agreed in writing with the
Planning Authority, full details of the proposed surface water drainage scheme shall be submitted to
and for the approval of the said Authority.  For the avoidance of doubt the drainage scheme must
comply with the requirements of the publication titled `Drainage Assessment : A Guide for Scotland'
and any other advice subsequently published by the Scottish Environment Protection Agency (SEPA)
or the Sustainable Urban Drainage Scottish Working Party (SUDSWP). 
The post-development surface water discharges shall ensure that the rate and quantity of run-off to
any watercourse are no greater than the pre-development run-off for any storm return period unless it
can be demonstrated that a higher discharge is necessary to protect or improve the aquatic habitat. 
SUDS shall still be provided even where discharges are proposed to public sewers notwithstanding
any conditions imposed by Scottish Water.
Reason: To ensure that the drainage scheme complies with best SUDS practice to protect adjacent
watercourses and groundwater. 
7. That the SUDS compliant surface water drainage scheme approved in terms of Condition 6 shall be
implemented contemporaneously with the development in so far as is reasonably practical.  Within
three months of the construction of the SUDS, a certificate (signed by a Chartered Civil Engineer
experienced in drainage works) shall be submitted to the Planning Authority confirming that the SUDS
has been constructed in accordance with the relevant CIRIA Manual and the approved plans. 
Reason: To safeguard adjacent watercourses and groundwater from pollution. 
8. That PRIOR to the occupation of the development, the applicant shall provide written confirmation to
the Planning Authority that all the requirements of Scottish Water can be fully met to demonstrate that
the development will not have an impact on their assets, and that suitable infrastructure can be put in
place to support the development. 
Reason: To ensure the provision of adequate water supply and drainage provisions.
9. That before the development herby permitted first comes into use, the means of vehicular and
pedestrian access shall be constructed in accordance with the approved plans and that all the parking
and manoeuvring areas shown on the plans shall be levelled, properly drained, surfaced in a material
which has been approved in writing and clearly marked out.  Thereafter, it shall be maintained as such. 
Reason: In the interests of traffic and pedestrian safety and visual amenity of the area.
10. That BEFORE the development hereby permitted starts, a management and maintenance scheme
shall be submitted to, and approved in writing by the Planning Authority, and it shall include proposals
for the continuing care, maintenance and protection of:-
Page 10 of 48

Page 11

(a) the proposed parking areas 
(b) the proposed grassed, planted and landscaped areas;
(c) the proposed fences to be erected along the boundaries.
Reason: In the interest of the amenity of the site and the general area.
11. That BEFORE completion of the development hereby permitted, the management and maintenance
scheme approved under the terms of condition 10 shall be in operation. 
Reason: In the interest of the amenity of the site and the general area.
12. That BEFORE the development is brought into use details of the external scheme of lighting including
the type, dimensions and locations of fittings and associated electrical equipment shall be submitted
to, and approved in writing by the Planning Authority. 
Reason: In the interests of Amenity
13. That prior to the commencement of any works on-site, full details of the final layout, design and
specification of mechanical plant and services to be installed within the units shall be provided to the
Planning Authority for their written approval. For the avoidance of doubt any mitigation required shall
be implemented to the satisfaction of the Council.  
Reason: In the interests of residential amenity. 
14. That deliveries to the development for which planning permission is hereby granted shall take place
only between the following hours:
7am to 7pm
Reason: In the interests of Residential Amenity.
15. That BEFORE the development hereby permitted starts, full details of the facing materials to be used
on all external walls and roofs shall be submitted to, and approved in writing by the Planning Authority
and the development shall be implemented in accordance with the details approved under the terms of
this condition.
Reason: In the interests of Visual Amenity. 
Page 11 of 48

Page 12

Background Papers: 
Consultation Responses: 
Scottish Water     12 February 2026 
Environmental Health (including Pollution Control)  15 May 2026, 12 June 2026 
Traffic & Transportation    03 June 2026, 18 June 2026
NLC Greenspace    07 April 2026, 16 June 2026, 23 July 2026
Scottish Gas Network    17 February 2026 
Contact Information: 
Any person wishing to inspect these documents should contact Susan Hunt at 01236 632500 
Report Date: 
24th August 2026
Page 12 of 48

Page 13

APPLICATION NO. 26/00093/FUL 
REPORT 
1. Site Description 
1.1 The application site lies within the Gartcosh and Glenboig Community Growth Area to the north of
Skipness Road, Gartcosh and has an area of 0.47 hectares.  The site is bound to the North by a SuDs
pond and Johnston Loch beyond, to the South by existing housing on Skipness Road and Gour Place,
and to the East by existing housing on Duror Drive and to the West by open fields.  Vehicular access
is to be taken from Skipness Road. 
1.2 The site consists of vacant open grassland with undulating topography.  The site falls away from the
high point along Skipness Road to the northern boundary of the site which runs adjacent to an existing
SuDs pond and sewer pipeline. 
2. Proposed Development 
2.1 This is a full detailed planning application and seeks permission for 5 retail units comprising Class 1 A
uses. 
2.2 Unit 1, is the largest unit and measures 26.8m x 16m (428sq.m) and is located in the westernmost
part of the site. It has a mono pitched roof and an overall height of 5.1m on the front elevation and
3.5m on the rear elevation. The applicant has confirmed that Unit 1 is to be occupied by a national
retail chain and operated as one of their smaller store formats.   
2.3 Units 2 to 5 comprise a terrace of 4 smaller units which are located to the east of the site.  The block
measures 35.6m x 12.3m with a footprint of approximately 438 square metres.  It has a mono pitched
roof, and the block is stepped to follow the ground level meaning that the height of the front elevation
of the unit increases from 5.1m closest to Skipness Road to 5.8m at the north of the site.   The rear
elevation overall height increases from 2.76m to 4.4m.  The floorspace is divided equally between the
four units with an internal area of 100 sqm.   The units have floor to ceiling glazing on the front elevation
and a single solid door to the rear.  
2.4 The proposed materials pallette comprises red brick with rendered block work to the walls, dark grey
roofing panels with dark grey window frames, flashings, trims and gutters.  
2.5 The proposal includes a cut and fill exercise to provide a more level site to accommodate the retail
units and car parking whilst tying in with the existing level of Skipness Road.  The site currently drops
to the north of the site along the line of the sewer and existing SUDs basin.   
2.6 The proposed elevation shows areas for signage for each of the units; and these would be assessed
separately through application(s) for advertising consent should permission be granted.  
3. Applicant’s Supporting Information 
• Design and Access Statement 
• Transport Statement 
• Delivery and Servicing Management Plan 
• Noise Assessment 
• Ecological Appraisal (including further Habitat Suitability Index report and eDNA report) 
• Landscaping Plans
Page 13 of 48

Page 14

• Site Investigation 
4. Site History  
4.1 Relevant applications with pertinence to the proposed development of this site include the following: 
• 12/00247/EIASCR: Proposed Residential Development (EIA Screening Request) 
• 12/01151/PAN: Proposed Residential Development, Road Infrastructure and Landscaping 
• 14/01849/PPP: Residential Development with Associated Access Roads, Open Space,
Landscaping and Ancillary Facilities (Including 0.5ha for retail purposes) (up to 300 houses)
granted 11 January 2017
• 16/01850/MSC: Application for matters specified by condition of application 14/01849/PPP
consisting of 247 residential units, associated drainage, infrastructure, road and landscape works
granted 01 May 2017
5. Development Plan 
5.1 The Development Plan consists of National Planning Framework 4 (NPF4) and the North Lanarkshire
Local Development Plan 2022 (LDP).  NPF4 was adopted by the Scottish Government in February
2023 and prevails over any policies in the Local Development Plan that are incompatible with its aims
and objectives.  The policies relevant to the application are: 
National Planning Framework 4 (NPF4) 
Policy 1 Tackling the climate and nature crisis  
Policy 2 Climate mitigation and adaptation 
Policy 3 Biodiversity 
Policy 12 Zero Waste 
Policy 13 Sustainable Transport  
Policy 14 Design, Quality and Place 
Policy 15 Local Living and 20 minute Neighbourhoods 
Policy 18 Infrastructure First 
Policy 20 Blue and Green Infrastructure 
Policy 22 Flood Risk and Water Management 
Policy 23 Health and Safety 
North Lanarkshire Local Development Plan (2022) (LDP) 
  
PP3 - Purpose of Place (General Urban Area) 
PROM LOC 3 – Housing Development Sites 
AD3 - Amount of Development  
PP1A – Strategic Town Centres 
AD 1A – Amount of Development 
Page 14 of 48

Page 15

PP1B – Other Town Centres 
AD 1B - Amount of Development 
PP1C – Local Centres 
AD1C – Amount of Development  
CI - Contributions to Infrastructure 
PROT A - Natural and Green Network Assets 
EDQ1 – Site Appraisal 
EDQ2 – Specific Features for Consideration 
EDQ3 – Quality of Development 
Other Guidance: 
 
Designing Streets: A Policy Statement for Scotland, Scottish Government 2010 
NLC Active Travel Strategy 2021-2031 
NLC Parking Standards 
Gartcosh Glenboig Community Growth Area Strategic Development Framework 
Gartcosh Local Place Plan 2025 
6. Consultations 
6.1 NLC Infrastructure and Transportation required clarification and further information during the
assessment of this application. They recommended deferral of the application due to 3 outstanding
matters relating to vehicle swept path analysis, parking provision and servicing arrangements to Unit
1.  The matters raised are assessed below in paragraph 8.35 
6.2 NLC Greenspace has confirmed that the Ecological Appraisal and additional Habitat Suitability Index
report and eDNA report are acceptable and requested that the landscaping and biodiversity
improvements be secured by condition.   
6.3 NLC Protective Services provided standard comments on the construction phase, requirement for Site
Investigation, Lighting and requested a Noise Assessment.  The applicant submitted a Noise
Assessment and following further information this was found to be acceptable with Pollution Control
requesting a condition to be applied regarding operating hours and specification of any plant to be
installed.   
6.4 Scottish Water has no objection to the proposal and advises that there is sufficient capacity in Balmore
Water Treatment Works and for foul water to the Dalmuir Waste Water Treatment Works.   
6.5 Scottish Gas Network has no objection and notes that there are no High Pressure assets within the
vicinity of the site.   
7. Representations 
7.1 Following standard neighbour notification and newspaper advertisement 27 letters of representation
were received. The main points can be summarised as follows: 
Page 15 of 48

Page 16

7.2 22 letters of objection (more than 1 objection received from 3 addresses) received stating the following
concerns: 
• Design and layout of the site 
• Loss of Character and Residential Setting 
• Increased Traffic and Congestion 
• Suitability of the wider road network to accommodate the development (including junction to A725
and traffic calming requirement on Skipness Road) 
• Safety of Vehicles, Pedestrians and Pets in the surrounding area 
• Lack of pedestrian connections  
• Privacy and Overlooking (including Land raising, child safety and wellbeing)  
• Increase of people to the area 
• Noise (from delivery vehicles, refrigeration and ventilation systems, waste collection and staff
operations) 
• Overdevelopment of the Site 
• Impact on Sunlight 
• Light pollution 
• Insufficient screening and landscape mitigation 
• Loss of Green Space 
• Impact on local biodiversity and wildlife (including bio security matters) 
• The development would block or limit views for residents in the area 
• Too much parking 
• Car park would become a focal point for antisocial behaviour 
• Odour, Waste, Litter and Vermin 
• No specified boundary treatment 
• Lack of Community Engagement 
• Lack of capacity in infrastructure (already over flowing sewers) 
7.3 5 letters of support were also received. In summary they made the following comments in support of
the proposal: 
• the creation of local jobs 
• increased local amenities that are much needed in the area  
• increased local spending 
• sustainability and reduced car dependency 
• long-standing planning intent  
Page 16 of 48

Page 17

8. Planning Assessment  
8.1 Section 25 of the Town and Country Planning (Scotland) Act 1997 requires that the application be
determined in accordance with the development plan unless material considerations indicate
otherwise.  The Development Plan consists of National Planning Framework (NPF4) and the North
Lanarkshire Local Development Plan (LDP). NPF4 was adopted by the Scottish Government in
February 2023 and prevails over any policies in the Local Development Plan that are incompatible
with its aims and objectives.   With regard to decision making, development that accords with the
Development Plan should be approved unless the adverse effects of doing so would significantly and
demonstrably outweigh any benefits that the development could expect to deliver.   
Background  
8.2 The Gartcosh Glenboig Community Growth Area concept statement of April 2010 and the South
Cumbernauld Community Growth Area Strategic Development Framework, June 2016 set out the
Council’s guiding principles for development across the GCA. 
8.3 The land to which the proposal relates lies within the Gartcosh Glenboig Community Growth Area
(CGA) in the North Lanarkshire Local Development Plan (LDP) 2022.  There is not a masterplan or
planning permission in principle approval which covers the entirety of the CGA.  Individual sites within
the CGA have been brought forward on their own merit. 
8.4 The application site falls within a larger site granted Planning Permission in Principle (PPP) in
(14/01849/PPP); however, the applicant has chosen to submit a stand-alone full detailed planning
application and not an application for Matters Specified by Condition.  That said, the site location aligns
with condition 2 of the PPP which requires the location of the local neighbourhood centre (0.5ha) to
be allocated and safeguarded as the MSC applications came forward.   This was established through
the granting of 16/01850/MSC in May 2017 which assessed the location of the local neighbourhood
centre and safeguarded the site for a future application to be brought forward. 
8.5 It is considered that granting this full detailed planning permission would not preclude or impinge upon
the implementation of Planning Permission in Principle,14/01849/PPP or Matters Specified by
condition application 16/01850/MSC or any future MSC applications linked to the PPP.   
EIA Screening 
8.6 This type of application is considered to fall within the ‘urban development project’ in terms of Schedule
2 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017.  As the
application site is not located in a ‘sensitive area’ (as defined by  the EIA Regulations) and the
application site does not exceed the 0.5ha threshold for urban development projects the application
does not require to be the subject of Environmental Impact Assessment. 
Community Consultation 
8.7 The proposal is classed as ‘local’ development under the provisions of the Town and Country Planning
Hierarchy of Developments (Scotland) Regulations 2009.   As such, pre-application consultation prior
to submission of the application was not required in terms of the Town and Country Planning
(Development Management Procedure) (Scotland) Regulations 2021. 
National Planning Framework 4 
Page 17 of 48

Page 18

8.8 NPF4 Policy 1 Tackling the Climate and Nature Crises states that when assessing development
proposals, significant weight will be given to tackling these crises and Policy 2 Climate Mitigation and
Adaptation requires that development minimise greenhouse gas emissions and promote energy
efficiency and renewable energy.  The site is located within the General Urban Area within the North
Lanarkshire Local Development Plan and is allocated for development.  It is therefore considered to
be a sustainable site in terms of its location, in that it supports the development plan’s spatial strategy
of compact urban growth, and it is well served by public transport options, strategic cycling and
footpath networks and is in close proximity to schools and employment opportunities.   The site is not
covered by any national or local nature designations, and a Preliminary Ecological Assessment
supporting the application concludes that the site is of limited biodiversity and includes areas of
planting within its landscaping proposals.  Surface water is taken to an existing Sustainable Urban
Drainage System which takes in to account future climate change.  Overall, it is considered that the
proposal is in accordance with the main principles of Policy 1 and Policy 2. 
8.9 NPF4 Policy 3 Biodiversity requires major development proposals to conserve, restore and enhance
biodiversity.  The Preliminary Ecological Assessment submitted with the application shows limited
ecological value across the site. It is concluded that the landscaping scheme, to be secured by
condition, can be reasonably considered to offer a proportionate level of biodiversity enhancements
through the introduction of habitat rich tree, shrub and grass planting thereby complying with Policy
3. 
8.10 NPF4 Policy 12 Zero Waste seeks to reduce, reuse or recycle materials in line with the waste
hierarchy.   Upon completion of the development the site would be managed privately to dispose of
commercial waste.  The Service and Delivery Management Plan confirms that for the operator of the
larger unit, recycling is made up primarily of packaging waste and is stored in the unit and returned to
their distribution centre following each daily delivery.  A small amount of perishable waste will be
collected in Eurobins which are collected via private contract on an ‘as needed’ basis but typically once
per week.   For the smaller units waste will be collected via private contract.   
8.11 NPF4 Policy 13 Sustainable Transport seeks to encourage, promote and facilitate developments that
prioritise walking, wheeling, cycling and public transport for everyday travel and reduce the need to
travel unsustainably. This development is located within the wider Community Growth Area near
established bus, rail, road and cycle routes and is considered to show sufficient connectivity to meet
this policy requirement. As such it is considered that the development accords with this policy. 
8.12 NPF4 Policy 14 Design, Quality and Place seeks to ensure that developments are of a good design,
are not detrimental to the amenity of the surrounding area and are consistent with the 6 qualities of
successful places – Healthy, Pleasant, Connected, Distinctive, Sustainable and Adaptable. It is
considered that the proposal is largely consistent with these qualities.   However, it is considered that
the impact of noise and co-location to nearby existing residential uses requires particular consideration
and this is assessed below against the Environmental and Design Qualities policies, EDQ 1, 2, 3 of
the LDP. The principles of this policy are enshrined, and expanded upon, within the Environmental
Design Policies EDQ1-3 of the North Lanarkshire Local Development Plan and are discussed in more
detail below. 
8.13 Policy 15 (Local Living and 20 Minute Neighbourhoods) This policy intends to encourage, promote
and facilitate the application of the Place Principle and create connected and compact neighbourhoods
where people can meet the majority of their daily needs within a reasonable distance of their home,
Page 18 of 48

Page 19

preferably by walking, wheeling or cycling or using sustainable transport options. Being within an urban
area the site is well served by road, bus and footpath links. The site selection process for the
Community Growth Area took these principles into account.  It is therefore considered that this
application accords with the principles of policy 15. 
8.14 NPF 4 Policy 18 Infrastructure First supports developments that provide (or contribute to) infrastructure
in line with that identified in LDPs and their delivery programmes.  The wider Community Growth Area
is subject to financial contributions relating to the wider road network and education provision;
however, this is limited to residential units and not to commercial development.  No infrastructure
requirements have been identified in the assessment of this application.  The application is therefore
considered to be in accordance with NPF4 Policy 18.     
8.15 NPF4 Policy 20 Blue and Green Infrastructure seeks to protect and enhance blue and green
infrastructure and their networks.  The wider PPP site is included in the LDP protect Map where there
is a general designation relating to the Seven Lochs Wetland Park project.  In terms of blue
infrastructure, there are no watercourses on site and the site is designed to drain to the SUDs system
already in place for the wider PPP site.  The proposal does not impact on watercourses or Johnston
Loch.  The application does not adversely impact on the wider green infrastructure routes and the
proposed landscaping is satisfactory in terms of its planting scheme. However, it is considered prudent
to attach a condition to control this matter. The application is therefore considered to be in accordance
with NPF4 Policy 20. 
8.16 NPF 4 Policy 22 Flood Risk and Water Management seeks to strengthen resilience to flood risk by
promoting avoidance as a first principle and reducing the vulnerability of existing and future
development to flooding.  The site does not fall within an area identified on SEPA flood maps as at risk
of fluvial or river flooding.  14/01849/PPP and 16/01850/MSC were both supported by flood risk
assessments which confirmed that this site is not in an area affected by flooding or requiring any
mitigation measures.   Surface water from the site is to be fed to the existing SUDs pond immediately
north of the site before discharge to the watercourse channel to the west of the site. 
8.17 NPF4 Policy 23 Health and Safety seeks to protect people and places from environmental harm,
mitigate risks arising from safety hazards and encourage, promote and facilitate development that
improves health and wellbeing. Criteria (e) notes that development proposals that are likely to raise
unacceptable noise issues will not be supported and that a Noise Impact Assessment may be required
where the nature of the proposal or its location raise the potential need for noise to be considered. A
Noise Assessment has been submitted for the site and this matter is considered below against the
Environmental and Design Qualities policies, EDQ 1, 2, 3 of the LDP. 
North Lanarkshire Council Local Development Plan 
8.18 The site falls within the Gartcosh Glenboig Community Growth Area in the North Lanarkshire Local
Development Plan and sits within a wider area zoned as PP3 Purpose of Place General Urban Area
that seeks to encourage development in keeping with their residential character whilst acknowledging
that uses outwith classes 8 and 9 of an appropriate scale, within recognisably mixed use areas can
be appropriate to maintain and support the operation of the General Urban Area.  The policy requires
an assessment of appropriateness and list of information to be included.   In terms of retail provision
the application requires to satisfy the provisions of Policy PP1A in that it has been assessed using the
Town Centres First Sequential Approach, its impact on the General Urban Area, evidence of specific
locational need, significant economic benefit and impact on travel patterns. 
Page 19 of 48

Page 20

8.19 In this instance the site falls within the Gartcosh Glenboig Community Growth Area and the Strategic
Development Framework, and whilst pre-dating the Local Development Plan, carries significant weight
when assessing this application and as such the sequential approach is not required as a specific
locational need has been established for local retail development in this area through the approval of
the CGA.  Furthermore, the trigger points for retail impact assessment detailed in policies AD 1 A, AD
1B and AD 1C are not considered appropriate in the assessment of this planning application as the
Strategic Development Framework stipulates the amount of retail development that can be brought
forward without the requirement for a Retail Impact Assessment. 
8.20 The Vision of the Strategic Development Framework (SDF) is to provide infrastructure appropriate to
the development including retail and community uses necessary to support the residential area.   The
SDF requires developers to allocate and safeguard an appropriate area of land for this purpose in
applications coming forward. The SDF states that anything larger than 1200 sqm gross retail
floorspace and 3800 sqm parking and circulation (0.5ha) will require to be justified based on a robust
Retail Impact Assessment. 
8.21 The proposed development meets the terms of the SDF and therefore a Retail Impact Assessment is
not required. 
8.22 Planning Permission in Principle 14/01849/PPP granted on 10 January 2017, prior to the adoption of
the Local Development Plan, established the location of the 0.5ha area for retail provision and the
retail provision was secured via condition for forthcoming MSC applications.    Permission
16/01850/MSC granted on 01 May 2017 further assessed the location of the retail provision.    
8.23 Whilst it is accepted that this application has been submitted as a full detailed planning application and
not as a Matter Specified by Conditions application associated with 14/01849/PPP it is considered that
the principle of this scale of retail development in this location is justified and acceptable as the detailed
application has been located on the site the identified for this purpose. 
8.24 CI Contributions to Infrastructure seeks to secure developer contributions for new developments, that,
individually or cumulatively, generate a requirement for new or enhanced infrastructure services. The
Community Growth Area as whole is subject to agreed contributions for education and off-site road
improvement described in the Strategic Development Framework for residential developments;
however, this is not extended to commercial developments and as such no contributions are
required.  No other contribution requirements have been identified during the assessment of the
proposed development.   
8.25 PROT A - Natural and Green Network Assets seeks to protect natural and resilient sustainable places
by safeguarding natural heritage assets.  Category A5 requires an appraisal to demonstrate that
protected species would not be compromised or any significant adverse effects on the protected
species are appropriately mitigated.  The applicant has submitted the required ecological
assessments, and these have not identified any protected species or protected habitats.  The
proposed landscaping is considered acceptable and can be secured via condition.   
8.26 The Environmental & Design Qualities policies EDQ1-3 within the North Lanarkshire Local
Development Plan apply to this application. The supporting Planning Statement accompanying the
planning application provides an acceptable site appraisal upon which the design has been developed
and therefore complies with EDQ1. 
Page 20 of 48

Page 21

8.27 Policy EDQ2 Specific Features for Consideration states that consideration will be given to
development in areas subject to hazards (hazardous zones) and other specific features such as in
accordance with plans and protocols of the relevant managing agencies.  In this case Flood Risk and
Contaminated Land are considered. 
8.28 In terms of Flood Risk, the site does not fall within an area identified on SEPA flood maps as at risk of
fluvial or river flooding.  14/01849/PPP and 16/01850/MSC were both supported by flood risk
assessments which confirmed that this site is not in an area affected by flooding or requiring any
mitigation measures. 
8.29 In terms of contaminated land, a Site Investigation has been submitted in respect of this application
but its review has not been concluded.  On this basis, it is considered that a standard condition
requiring the submission of the Site Investigation and Remediation Strategy be applied together with
a further condition requiring any remediation measures required to be verified.   
8.30 The site does not fall within a High Risk area in terms of previous mining activity and as such a Coal
Mining Risk Assessment is not required.   
8.31 No Utilities Infrastructure is identified on the site in terms of the EDQ2B. 
8.32 Turning to EDQ2 C, the site is not located in an Air Quality or Noise Management Area.  The scale and
nature of the development is not considered to be such that an Air Quality Assessment is required.  In
terms of noise, the applicant submitted a Noise Assessment and following clarification on certain
matters, Protective Services are satisfied with the Noise Assessment and have recommended that
should permission be granted then conditions restricting deliveries to between 07:00 and 19:00 and
the submission of the final, design and specification of any mechanical plant be prior to any works
starting on site.   These conditions are considered reasonable and can be applied to any permission
granted. 
8.33 Taking the above into account it is considered that the application accords with the provisions of Policy
EDQ2.   
8.34 EDQ3 Quality of Development seeks to ensure that high standards of site planning and sustainable
design are achieved and provides criteria to assess the application against.   
8.35 The location of the site within the Community Growth Area is discussed above and found to be
acceptable and well served in terms of vehicular and pedestrian access taken from the main vehicular
road through the Phase 1 residential site approved under 16/01850/MSC.   The internal layout and
design of the site are considered to be acceptable.  Whilst of standard commercial design the retail
units are commensurate with similar retail development and shall deliver a high quality development
with a material palette of red brick and render that references the surrounding residential
developments.   It is considered that the development represents a safe, pleasant, inclusive,
convenient and welcoming development. It is acknowledged that the car parking is centrally located
within the site and is visually prominent; however, this layout has been arrived at as a result of the
fixed location of the vehicular access to the site. NLC Traffic and Transportation initially recommended
deferral on the basis of lack of parking but have subsequently confirmed that the parking provision is
acceptable for a retail development of the scale proposed.   Turning to the service vehicle tracking
Page 21 of 48

Page 22

exercise carried out it is acknowledged that the type of delivery vehicle used for servicing the site will
have to be controlled as the applicant has not been able to demonstrate the ability to meet the terms
of the worst case service vehicle scenario. However, it has been adequately demonstrated that the
site can be serviced and this private development will have control over the vehicles servicing the
site.  The applicant has also relocated the bin stores for Units 2-5 to be collected from Skipness Road
rather than from within the site to further reduce potential impact.   Finally, whilst it is noted that NLC
Transportation and Infrastructure requested a separate servicing access for Unit 1, given the physical
constraints of the site, the requirement for retail development in this location and the limited scale of
the unit it is considered that a separate servicing access is not necessary given these circumstances.   
8.36 The retail spaces are designed to meet SBEM calculations for commercial development in relation to
energy efficiency and carbon targets required to demonstrate compliance with building regulations.   
8.37 The development is not of a scale to require an Air Quality Assessment.   
8.38 The applicant submitted a Noise Assessment with the application to assess any impact on
neighbouring residential properties.  NLC Protective Services has reviewed the Noise Assessment
and found it to be acceptable and have recommended conditions relating to hours of operation and
details of mechanical plant that may be installed.  Appropriate conditions are attached to control these
matters. 
8.39 In terms of drainage and surface water treatment the site would be served by the adjacent main
residential SUDs pond which has been sized (during the PPP and MSC process) to accommodate the
surface water run-off from the site.   It is noted that this drainage infrastructure is already in place with
its design and installation confirmed via the discharge of conditions process associated with
16/01850/MSC. In terms of protecting water body status the site does not build over any culverts and
the SUDs provided means that the development would not adversely affect Johnston Loch.     
8.40 Adequate provision can be made for the development and maintenance of car parking and
landscaping can be controlled by suitably worded conditions.   
8.41 For the reasons discussed above it is considered that the application accords with the provisions of
Policy EDQ3.   
8.42 Taking the foregoing discussion into account, it is considered that the proposal complies with the
relevant policy provisions of National Planning Framework 4 and the North Lanarkshire Local
Development Plan. 
Material Considerations 
Gartcosh Local Place Plan 2025 
8.43 Gartcosh Local Place Plan is a material consideration in assessing this application and is a community-
led framework outlining the vision, priorities, and actions for the village’s development and is formally
registered with North Lanarkshire Council.   
Page 22 of 48

Page 23

8.44 The Plan shows an icon indicating the site as Zoned for Community Use (Retail Hub).  The plan goes
on to advise that should retail development not be brought forward on this site then it should be zoned
for community use and should not be developed for further housing.  It also shares an aspiration that,
should retail development be brought forward, direct discussions would be held with the community
and the owners/developers and that community consultation information can assist in the retail
development in terms of location and proximity to housing.    This would be a matter for the parties
that prepared the the Gartcosh Local Place plan to take forward.  The planning application process
provides for neighbour notification and press advert to allow any representations to be made on the
application. 
8.45 It is considered that the proposed development largely aligns with the Local Place Plan for the area. 
9. Representations 
9.1 22 letters of objection (more than 1 objection received from 3 addresses) received with concerns
summarised and addressed in turn below: 
9.2 Design and layout of the site 
It is acknowledged that units are of standard retail design; however, this is commensurate with similar
modern retail developments of a similar scale. The material palette has been chosen to reflect the
nearby residential developments and is considered acceptable.   The car park is located centrally;
however, the vehicular access onto Skipness Road is in a set location and cannot be moved. This
layout serves the retail units at both ends of the site and prevents car parking adjacent to residential
properties.  The layout also maintains a view through the site from Skipness Road.  Objections include
reference to a lack of inclusion of an area where residents can gather.  This site within the wider
Community Growth Area is identified for retail development which is to be brought forward by the
private sector and therefore there is no planning requirement to include such an area.   
9.3 Loss of Character and Residential Setting 
The proposed development fulfils the Strategic Development Vision that a local centre be provided to
serve the Community Growth Area the proposal is not considered to be of such a scale and nature
that would detract from the residential character of the area.   
9.4 Increased Traffic and Congestion   
The application is supported by a Transport Assessment which demonstrates that the proposed
development can be accommodated at this site and NLC Infrastructure and Transportation have no
concerns or objections in relation to this matter. 
9.5 Suitability of the wider road network to accommodate the development (including junction to
A725 and traffic calming requirement on Skipness Road)   
The Transport Assessment, discussed above, demonstrated that the wider network could
accommodate the proposed development on this site without requiring any mitigation measures in the
wider area such as traffic calming.  Furthermore, no requirement for upgrading the junction with the
A725 was identified through this Transport Assessment or the previous Transport Assessments carried
Page 23 of 48

Page 24

out in support of planning permissions 14/01849/PPP and 16/01850/MSC which included provision for
retail development on this site.   
9.6 Safety of Vehicles, Pedestrians and Pets in the surrounding area 
It is acknowledged that as the site is currently vacant the development will increase traffic to the area;
however, as noted above access to the site is suitable for vehicles as is the wider road network and in
terms of pedestrian safety there are footways along Skipness Road.  Pet safety would be a matter for
pet owners.   
9.7 Lack of pedestrian connections   
It is considered that existing the pedestrian footways along Skipness Road and Gour Place linking to
the footway and boardwalk area are acceptable. The northern boundary is also largely bounded by a
SuDS pond and there are site level differences which constrain the site. 
9.8 Privacy and Overlooking (including Land raising)   
Consideration has been given to privacy and overlooking concerns.  It is not considered that the
development will cause unacceptable adverse privacy and overlooking of the adjacent residential
properties. The terraced row Units 2-5 have the rear elevation facing towards properties on Duror
Drive.  The rear elevation includes a single rear access door for each unit and no windows.  The rear
elevation is approximately 11m metres to the rear garden boundaries of Duror Drive and each property
then has its own 10 metre long rear garden. The 11 metre strip would have landscaping along this
boundary including 9 standard native trees along this boundary.  It is not anticipated that there would
be high activity levels to the rear of these units.   The site is designed in such a way that the terraced
retail unit would offer a visual screening of the central carpark (where most activity would take place)
from those residential properties immediately behind the proposed terrace.  Objections are raised
specifically relating to land raising and overlooking from the carpark to properties on Duror Drive;
however, it is considered that due to the intervening distance from the car park, the obscured angle
and intervening planting that this would not cause an unacceptable impact on privacy or overlooking.   
9.9 Increase of people to the area 
It is acknowledged that the development of this site for retail use will increase activity in the area;
however, the development is of a scale that is designed to serve the local area and has not been
designed to attract visitors from outwith the area.   
9.10 Noise (from delivery vehicles, refrigeration and ventilation systems, waste collection and staff
operations) 
The application is supported by a Noise Assessment and this has been reviewed by the Council’s
Protective Services team and found to be acceptable subject to planning conditions restricting delivery
times and requiring the submission of mechanical plant details to ensure that there is no unacceptable
adverse impact on residential amenity.   
9.11 Impact on Sunlight   
Taking the proposed height of the units into account the properties on Duror Drive are sufficient
distance from Units 2-5 (approximately 21m) that sunlight/daylight would not be unacceptably
Page 24 of 48

Page 25

impacted upon.  Similarly, properties on Gour Drive are sufficient distance from Unit 1 (approximately
23m) that sunlight/daylight would not be unacceptably impacted upon in terms of their front elevations. 
9.12 Overdevelopment of the Site 
It is considered that the proposal does not represent over development of the site with adequate
landscaping, parking and is off-set from boundaries.   
9.13 Light pollution 
A planning condition is recommended to be applied to require submission of the proposed lighting
scheme prior to development starting on site. 
9.14 Insufficient screening and landscape mitigation 
The proposed landscaping includes a mix of ornamental shrub planting, tree planting, hedge planting,
grass seeding (with pollinator mix) and pockets of native thicket mix.    It is considered that this offers
suitable landscaping for the proposed development with trees offering screening along the eastern
boundary. It is considered that the landscaping scheme has a proportionate increase in biodiversity at
the site.  NLC Greenspace has confirmed that the proposed landscaping is acceptable and this can
be secured by condition.   
9.15 No specified boundary treatment 
The boundary treatments in terms of fencing or hedging are shown on the landscaping plans and can
be secured by condition.   
9.16 Loss of Green Space 
The site is currently vacant, was previously used as a site compound whilst surrounding residential
development was carried out and has been identified for retail development for a number of years.  It
is not considered that this site represents a significant loss of Green Space and will be landscaped.   
9.17 Impact on local biodiversity and wildlife (including bio security matters) 
The applicant submitted the required ecological surveys for the site which conclude that it is of limited
ecological value and there is no presence of European Protected Species.  NLC Greenspace was
consulted on the surveys and has confirmed that they are acceptable.  The proposed landscaping is
considered acceptable and includes biodiversity measures which can be secured via planning
condition.   Any litter or any treatment of vermin does not fall within the planning remit but would fall to
the developer and future occupiers. 
9.18 The development would block or limit views for residents in the area 
It is acknowledged that the development will change current views towards the Loch; however, the
views from individual properties are not a material planning consideration.  In terms of wider views,
the car park being centrally located allows a view through to the loch. 
9.19 Too much parking 
The level of parking provision is at a level required to serve the scale of the development.   
Page 25 of 48

Page 26

9.20 Car park would become a focal point for antisocial behaviour 
The proposed layout adopts a Secured By Design layout.  The car park is centrally located within the
layout with passive surveillance offered by the proposed units.  There is also an element of overlooking
from neighbouring residential properties.  Any future antisocial behaviour occurring within the site falls
to the management of the development and is outwith the remit of planning legislation. 
9.21 Odour, Waste, Litter and Vermin 
There are no odour producing uses (such as hot food takeaway or industrial manufacturing) included
in this development.  The proposed layout provides bin stores to serve the development.  The applicant
has confirmed that waste will be collected under private contract arrangement to serve the terraced
units and that the national operator will service Unit 1 in line with their current procedures.  It is for the
developer and occupiers to ensure that the site is maintained and any future issues relating to litter or
vermin are addressed.   
9.22 Lack of Community Engagement 
This application is classed as a local development and as such no formal Pre-Application Consultation
exercise is required under planning legislation.  The application has been advertised in the local press
and neighbour notification carried out which meets the terms of the regulations.   
9.23 Lack of capacity in infrastructure (already over-flowing sewers) 
Scottish Water has confirmed that there is capacity to accommodate the development within its foul
waste treatment plan.  A condition securing confirmation that the development meets the requirements
of Scottish Water in terms of foul drainage can be applied. 
9.24 Turning to the 5 letters of support the points stated are summarised below: 
• the creation of local jobs 
• increased local amenities that are much needed in the area  
• increase local spending 
• sustainability and reduced car dependency 
• long-standing planning intent 
9.25 In terms of these points it is acknowledged that the development will result in jobs being created, the
development will support the local area in terms of local retail provision, it will encourage local
spending, is within a walkable distance for local residents and fulfils the long-term vision of the
Strategic Development Framework in terms of the Community Growth Area.   
9.26 Consideration has been given to the points raised in the representations; however, these raise no
material considerations that would outweigh the planning policy assessment above or merit the refusal
of the application.   
10. Conclusions 
Taking the above into account, it is considered that the proposed development is in accordance with
the relevant policies of the development plan.  The design and layout is of high quality, would deliver
the local retail provision required to support the wider community growth area and would integrate
satisfactorily with the surrounding area. The technical supporting documents demonstrate that the
proposal can be accommodated within the site without adverse impacts on the surrounding area.
Page 26 of 48

Page 27

Consideration has been given to the comments from consultees. No matters have been raised which
would merit the refusal of the application and appropriate conditions can be applied to address
matters raised.  Due consideration has also been given to issues raised in objections but these are
not upheld and do not carry such weight as to merit the refusal of the application.  On this basis, it is
recommended that planning permission be granted subject to conditions. 
Page 27 of 48

Page 28

Application No:  
26/00528/FUL
Proposed Development: 
Change of Use of Unit to Use Class 11: Leisure and Recreation
for Use as a Fitness Cycle Studio 
Site Address: 
1 Badenheath Place
Westfield
Cumbernauld
G68 9HX 
Date Registered: 
18th June 2026 
Applicant:
Revolution Spin 
Agent:
CBRE
Bothwell Street
Glasgow
G2 7ER 
Application Level:
Local Application 
Contrary to Development Plan:
Yes
Ward:   
02 Cumbernauld North 
DanishAshraf,Tom Fisher, 
Alan Masterton,Gordon Currie
Representations:
1 letter of representation received.   
Recommendation: Approve Subject to Conditions 
Reasoned Justification: The proposed development is acceptable as it could be
accommodated within the site without adversely affecting the general amenity of this light
industrial area. As such, the proposal is considered to accords with the policy provisions of the
Development Plan. 
Page 28 of 48

Page 29

Reproduced by permission of
the Ordnance Survey on
behalf of HMSO. © Crown
Copyright and database right
2009. All rights reserved.
Ordnance Survey Licence
number 100023396.
Planning Application: 26/00528/FUL 
Name (of applicant): Revolution Spin
Site Address: 1 Badenheath Place
Westfield
Cumbernauld
G68 9HX
Development: Change of Use of Unit to
Use Class 11: Leisure and Recreation for
Use as a Fitness Cycle Studio   
Page 29 of 48

Page 30

Proposed Conditions: - 
1. That the development hereby permitted shall be carried out strictly in accordance with the approved
details submitted as part of the application and no change to those details shall be made without prior
written approval of the Planning Authority. 
Reason: To clarify the drawings on which this approval of permission is founded. 
2. That, notwithstanding the provisions of the Town and Country Planning (General Permitted
Development) (Scotland) Order 1992, the premises shall be used as a fitness studio and for no other
purposes (including any other Use Classes in the Town and Country Planning (Use Classes)
(Scotland) Order 1997). Should this use cease than the unit shall revert back to use class 6 (Storage
and Distribution). 
Reason: To enable the Planning Authority to retain effective control and to ensure the building remains
an ancillary facility to benefit the operation and viability of the adjacent industrial area. 
3. Noise associated with the completed development shall not give rise to a noise level, assessed with
the windows open, within any dwelling or noise sensitive buildings in excess of the equivalent to Noise
Rating Curve (N.R.C.) 30 between 07.00 hours and 23.00 hours and N.R.C. 25 at all other times. 
Reason: To define the permission 
Page 30 of 48

Page 31

Background Papers: 
Consultation Responses: 
Email from Environmental Health (including Pollution Control) dated 14 July 2026. 
Response from Food Safety / Business Regulations dated 16 July 2026. 
Email from National Air Traffic Services (Safeguarding) Mailbox  dated 24 June 2026. 
Email from Scottish Gas Network dated 19 June 2026. 
Contact Information: 
Any person wishing to inspect these documents should contact Alex Reid at 01236 632500 
Report Date: 
12th August 2026
Page 31 of 48

Page 32

APPLICATION NO. 26/00528/FUL 
REPORT 
1. Site Description 
The application site comprises of a vacant industrial unit located within a group of mixed sized
industrial/leisure units at Badenheath Place, Westfield, Cumbernauld. This forms part of an
established industrial area which in recent times has allowed the introduction of leisure uses
(e.g. arts and crafts centre). The unit was formerly used as an arts and crafts centre which
includes a community drop-in and recycling and retail element. The application site is
bounded by industrial and leisure units to the south, similar units to the north, east and west
with associated car parking to the north and east. 
2. Proposed Development 
2.1  The application seeks planning permission for the change of use of unit to a Class 11 (Assembly and
Leisure) Fitness Studio, with no physical alterations proposed. A planning condition is attached
ensuring that, upon cessation of the approved use, the unit reverts back to the originally intended
industrial use. 
2.2 The proposal will facilitate the relocation of the existing Revolution Spin Studio which is located at 10
Badenheath Place which is opposite the proposal site. 
3. Applicant’s Supporting Information 
3.1 There was additional information submitted as part of the submission. The following information can
be summarised as follows: 
3.2 The proposal seeks planning permission for the change of use of vacant Unit 1 Badenheath Place to
a Class 11 spin cycle studio, facilitating the relocation and expansion of the established Revolution
Spin business, which has operated within Westfield Industrial Estate since 2022. 
3.3 Market evidence demonstrates that the unit is unsuitable for modern industrial occupiers, lacking roller
shutter access and retaining a leisure-style fit-out. Despite Westfield being 99% occupied, interest in
the unit has come primarily from leisure and non-industrial operators, supporting the proposed use. 
3.4 A sequential assessment under Policies PP1A and PP2A found no suitable or available town centre
or edge-of-centre premises capable of accommodating the business's operational requirements, floor
area needs, and established customer base. The proposed unit was identified as the only suitable
available premises in the Westfield, Wardpark and Lenziemill markets. 
3.5 The proposal complements an established mix of leisure, business and industrial uses within the
Strategic Business Centre and will not prejudice its business function. Traffic movements, parking
demand and accessibility remain effectively unchanged as the business is relocating opposite its
existing premises. 
3.6 The site is located within a designated Strategic Business Centre where Policy 2A supports non-
ancillary uses where they can be justified through a sequential assessment, compatibility with
surrounding uses, economic benefit, and acceptable transport impacts. The proposal demonstrates
that no suitable town centre or edge-of-centre premises were available to accommodate the business's
operational requirements and identifies Unit 1 Badenheath Place as the only suitable available unit
locally. The proposed use is compatible with the area's established mix of industrial, commercial and
leisure occupiers, including several existing Class 11 leisure uses, and will not prejudice the function
or attractiveness of the business centre. The relocation will retain an established local business and
associated employment while reusing a vacant unit that is considered unattractive to traditional Class
4, 5 and 6 occupiers. As the business is moving from nearby premises within the same estate, parking,
accessibility, and traffic movements are expected to remain largely unchanged. Overall, the proposal
Page 32 of 48

Page 33

is considered compliant with Policy 2A and the wider objectives of the North Lanarkshire Local
Development Plan.
3.7 Operational hours will be in line with the existing Revolution Unit. The business will operate within the
hours below. 
• Monday to Thursday 06:00 to 20:00
• Friday 06:00 to 18:00
• Saturday and Sunday 09:00 to 12:00 
3.8 The existing parking will be retained for visitor and staff use and access will remain as existing. 
4. Site History 
• 06/00556/FUL Provision of 13 Additional Parking Spaces (permitted 2 May 2006)
• 17/01078/FUL Alterations and Change of Use from Office to Storage/Warehouse (Permitted 25
August 2017)
• 18/00178/FUL Change of Use From Storage/Warehouse/Office to Leisure and Education Facility
including External Alterations (Refused 17 April 2018)
• 20/01093/FUL Change of Use to Arts and Crafts Centre including Community Drop-in, Recycling,
and a Retail Element (Permitted 19 November 2020)
• 20/01113/FUL Change of Use to Arts and Crafts Centre including Community Drop-in, Recycling,
and a Retail Element (Withdrawn 21 September 2020) 
5. Development Plan 
5.1 The development plan consists of National Planning Framework 4 (NPF4) adopted on the 13 
February and the North Lanarkshire Local Development Plan (LDP) adopted 2022. 
5.2  The following NPF4 policies are relevant: Policy 7 Local Living and 20 Minute Neighbourhoods, Policy
13 – Sustainable Transport, Policy 14 – Design, Quality and Place, Policy 21 – Play Recreation and
Sport. 
5.3 Additionally, the following policies within the Local Development Plan are relevant: Placemaking
Policies PP 2A Policy, Purpose of Place and AD4 Amount of Development, EDQ1 Site Appraisal and
EDQ3 Quality of Development  
6. Consultations 
6.1  NLC Protective Services were consulted on 6 July 2026. A response was received on 14 July
providing comments related to Noise, Lighting and Dust, these have been added as
Informatives. 
6.2 NLC Food Safety/Business Regulations were consulted on 26 June 2026. A response was
received on 16 July 2026 advising the following: 
• The business premises must comply with the requirements of the Health & Safety at Work
etc. Act 1974 and regulations made thereunder. 
• The design, layout and construction of food premises must comply with the requirements of
Food Hygiene (Scotland) Regulations 2006 and Retained Regulation (EC) 852/2004 
6.3 National Air Traffic Safety were consulted on 19 June 2026. A response was received on 24
June 2026 advising the proposed development does not conflict with their safeguarding
criteria. 
Page 33 of 48

Page 34

6.4 Scottish Gas Network were consulted on 19 June 2026. A response was received on 19 June
2026 advising they have no high-pressure assets within the vicinity. They have no comment
or objections. 
7. Representations 
Standard Neighbour notification letters were issued on 19 June 2026 as well as an advert placed in
the Cumbernauld News/Kilsyth Chronicles. This was published on 1 July 2026. One letter was received
raising the following comments: 
• Noise relating to business.
• Additional parking would be detrimental. 
8. Planning Assessment 
8.1  Section 25 of the Town and Country Planning (Scotland) Act 1997 requires that planning decisions
must be made in accordance with the development plan unless material considerations indicate
otherwise. The application raises no strategic issues and can be assessed against the local plan. 
8.2 NPF4 forms part of the development plan; given the nature and scale of this development, the most
relevant considerations are already enshrined in the North Lanarkshire Local Development Plan
policies (assessed below). The policies within NPF4 that are relevant to the application include Policy
7 Local Living and 20 Minute Neighbourhoods, Policy 13 – Sustainable Transport, Policy 14 – Design,
Quality and Place, Policy 21 – Play Recreation and Sport. 
8.3 The applicant previously obtained planning permission under application 22/00780/FUL for the change
of use of a unit within Badenheath Place to a leisure use. That permission was subsequently
implemented, and the business has operated successfully from Badenheath Place since that time.
This application seeks to facilitate the relocation of the existing business to an alternative unit within
the same locality at Badenheath Place. Given that the operation is already established in the area,
there have been no known issues relating to parking, traffic generation or noise nuisance, and it is not
considered that the proposed relocation would give rise to any materially different impacts. 
8.4 Policy 13 – Sustainable Transport seeks to encourage development that is sustainably located,
reduces the need to travel unsustainably, makes use of existing transport infrastructure, and supports
walking, wheeling, cycling, and public transport. Development should not result in unacceptable
impacts on the transport network or road safety. 
Assessment: As the business already operates within the immediate locality, the proposal is not
expected to generate additional traffic movements or materially alter travel patterns. The development
makes effective use of an existing commercial unit within an established business area and is not
considered likely to result in adverse impacts on the local road network, parking provision, or road
safety. The proposal therefore accords with the objectives of NPF4 Policy 13: Sustainable Transport. 
8.5 Policy 14 – Design, Quality and Place seeks to ensure development is well designed, compatible
with its surroundings, and contributes positively to place quality. Development should make productive
use of land and buildings, be adaptable, and not adversely affect the amenity or character of an area. 
Assessment: The proposed change of use would facilitate the occupation of an existing vacant
building by a fitness cycle studio currently operating from nearby premises within Badenheath Place.
The proposal involves no external alterations and would retain existing access and parking
arrangements. The use is compatible with the character of the surrounding area, where a range of
commercial, leisure and fitness uses are already established, and would secure the productive reuse
of a vacant building. The proposal is therefore considered to accord with the requirements of NPF4
Policy 14: Design, Quality and Place. 
Page 34 of 48

Page 35

8.6 Policy 15 - Local Living and 20 Minute Neighbourhoods supports development that contribute to
local living by maintaining and improving access to services, facilities, employment, and community
uses within reasonable distances of where people live. The policy seeks to create places where daily
needs can be met locally and where opportunities exist to access services by walking, wheeling,
cycling, and public transport. 
Assessment: The proposal involves the relocation of an existing fitness cycle studio from elsewhere
within Badenheath Place to Unit 1 Badenheath Place. The development would retain a leisure and
fitness facility within the locality, support health, and wellbeing objectives, and make effective use of
an existing commercial unit. Given that the business already operates within the immediate area, local
accessibility to the service would be maintained. The proposal is therefore considered to accord with
the aims and objectives of NPF4 Policy 15: Local Living and 20 Minute Neighbourhoods 
8.7 Policy 21 – Play Recreation and Sport seeks to encourage, promote and facilitate opportunities for
play, recreation, and sport, recognising their contribution to physical health, mental wellbeing, and
community development. The policy supports proposals that protect, maintain, or enhance sport and
recreational facilities and improve opportunities for participation in physical activity. 
Assessment: The development would maintain and enhance the provision of indoor sport and
recreational opportunities within the locality, supporting physical activity and community wellbeing. The
proposal would not result in the loss of any existing recreation facility and would bring a vacant unit
back into productive use. Accordingly, the proposal is considered to accord with the aims and
objectives of NPF4 Policy 21: Play, Recreation and Sport. 
8.8 PP 2A Policy, Purpose of Place seeks to safeguard land and premises for Class 4 (Business), Class
5 (General Industrial) and Class 6 (Storage and Distribution) uses, whilst allowing other uses where
they can be justified and where they do not prejudice the primary business and industrial function of
the area. 
Assessment: The proposal would facilitate the relocation of Revolution Spin from Unit 10 Badenheath
Place to Unit 1 Badenheath Place. As the business is already established within the estate, no material
change to the overall mix of uses, traffic generation or amenity impacts is anticipated. Furthermore,
the proposal would not prejudice the primary business and industrial function of the Strategic Business
Centre, with the existing unit becoming available for alternative business or industrial occupation. The
proposal would bring a vacant unit back into productive use, retain employment and support continued
economic activity within the estate. Accordingly, the proposal is considered to accord with Policy 2A
of the North Lanarkshire Local Development Plan. 
It is noted that planning permission 22/00780/FUL was granted subject to a condition which stipulated
that, should the leisure use cease at any future date, the unit would revert to a Class 6 (Storage and
Distribution) use, thereby safeguarding the long-term business and industrial function of the Strategic
Business Centre. The same condition shall be implemented for the proposed site. 
8.9 AD4 Amount of Development seeks to ensure that the scale and amount of development proposed
is appropriate to the site and its surroundings and that development does not exceed the capacity of
the site or result in unacceptable impacts on infrastructure, amenity, or the character of the area. 
Assessment: The proposal involves the relocation of an existing fitness cycle studio from Unit 10
Badenheath Place to Unit 1 Badenheath Place and does not include any extension or increase in the
building footprint. As the business is already established within the estate, the proposal is not
anticipated to result in a significant increase in activity, traffic generation or demand on local
infrastructure. The scale and nature of the development are considered proportionate to the site and
surrounding area, and the proposal is therefore consistent with the requirements of Policy AD4:
Amount of Development. 
Page 35 of 48

Page 36

8.10 Policy EDQ1 (Environmental Quality) of the North Lanarkshire Local Development Plan seeks to
ensure that development is of a high-quality design, is compatible with surrounding land uses, respects
its context, and does not adversely affect the character or amenity of the surrounding area. The policy
also requires consideration of access, parking, servicing, and integration with the existing built
environment. 
Assessment: The proposal is broadly compliant with Policy EDQ1 as it reuses an existing unit without
materially affecting the character, appearance, or function of the surrounding area 
8.11 Policy EDQ3 (Design and Accessibility) seeks to ensure that development does not result in
unacceptable impacts on the amenity of neighbouring occupiers through matters such as noise,
disturbance, traffic generation and parking demand. 
The proposal complies with Policy EDQ3, as there is no evidence that the proposed change of use
would result in unacceptable impacts on the amenity of neighbouring properties. Furthermore, the
fitness cycle studio is an established business already operating within Badenheath Place, Westfield,
and the application relates to its relocation to an alternative unit within the same area rather than the
introduction of a new use. 
8.12 The matters raised in the letters of objection are addressed in turn below. 
• Noise issues
Response: NLC Protective Services were consulted and commented on potential noise issues. This
has been added as a condition to prevent any detrimental impact to the neighbouring properties. 
• Additional parking would be detrimental.
Response: This is a relocation of an existing business with Badenheath Place. There will be no
additional parking requirements, and the existing parking will not change with the relocation of the
business. 
8.13 Whilst the proposal is considered to be contrary to the development plan, it is important to note that
the business has been operating from Badeneath Place since 2022 and is simply seeking to relocate
within the same commercial area, moving from No. 10 to No. 1. Furthermore, the surrounding area
accommodates a number of leisure and commercial businesses and is not characterised by heavy
industrial uses. Over time, the area has evolved to support a broader range of commercial activities
and the presence of these businesses contributes to the established commercial character of the
locality. 
9. Conclusions 
In conclusion, considering all the circumstances relevant to this application, the proposed development
is considered acceptable due to the existing leisure facilities already operating within the area. The
proposal will not have a detrimental effect on the neighbouring properties and character of the
surrounding area, therefore, the proposed development complies with the relevant policies within
National Planning Framework and within the North Lanarkshire Local Development Plan 2022. Taking
account of the provisions of the development plan and all other material considerations, it is
recommended that permission be granted subject to conditions. 
Page 36 of 48

Page 37

Application No:  
26/00602/FUL
Proposed Development: 
Formation of a smallholding with a residential lodge. 
Site Address: 
Land At
Meadowfield Road
Longriggend 
Date Registered: 
16th June 2026 
Applicant:
Mr Thomas  Williams
Meadowfield Fishery 
Meadowfield Road
Upperton 
Airdire 
ML6 7SA 
Agent:
Planning Services UK
37 Dyfrig Street 
Shotts 
ML7 4DQ 
Application Level:
Local Application 
Contrary to Development Plan:
Yes
Ward:   
08 Airdrie North 
Alan Beveridge, Sophia Coyle, Henry Emerson
Dunbar and Richard Alan Sullivan
Representations:
8 letters of representation received.   
Recommendation: Refuse 
Reasoned Justification: 
The proposal is unacceptable in terms of the development plan as it does not meet the criteria
set out in the relevant policies. It is considered that the proposed development at this location
would not represent a development that the National Planning Framework Policies and North
Lanarkshire Local Development Plan intends to support within the designated Greenbelt. 
Page 37 of 48

Page 38

Reproduced by permission of
the Ordnance Survey on
behalf of HMSO. © Crown
Copyright and database right
2009.  All rights reserved.
Ordnance Survey Licence
number 100023396.
Planning Application: 26/00602/FUL 
Name (of applicant): Mr Thomas Williams
Site Address: Land At
Meadowfield Road
Longriggend 
Development: Formation of a
Smallholding with a Residential Lodge   
Page 38 of 48

Page 39

Recommendation: Refuse for the Following Reasons:- 
1. The proposal is contrary to National Planning Framework 4 - NPF4 Policies 8 (Green Belt), 17 (Rural
Homes) and 29 (Rural Development) in that it does not comply with the criteria set out in the policies
that would justify a dwelling/chalet and associated smallholding development at this location. 
2. The proposal is contrary to the North Lanarkshire Development Plan Policies PP4 and AD 4 (Green
Belt) in that it does not comply with the criteria set out in the policies that would justify a
dwelling/chalet and associated smallholding development at this location. 
3. That the proposal is contrary to North Lanarkshire Development Plan Policies EQ1 and EQ3 (Quality
of Development) due to impact on the character of the landscape. 
Page 39 of 48

Page 40

Background Papers: 
Consultation Responses: 
Coal Mining Remediation Authority received 18th June 2026. 
North Lanarkshire Council Traffic & Transportation received 2nd July 2026. 
North Lanarkshire Council Environmental Health (including Pollution Control) received 17th of June 2026. 
North Lanarkshire Council NLC Greenspace – No response submitted. 
Contact Information: 
Any person wishing to inspect these documents should contact Paul Williams at 01236 632500 
Report Date: 
3rd September 2026
Page 40 of 48

Page 41

APPLICATION NO. 26/00602/FUL 
REPORT 
1. Site Description 
1.1 The site lies in open countryside approximately mid- way between the settlements of 
Upperton and Longriggend and is situated where Meadowfield Road bends from east – west to
south at approximate right angles. The site forms part of a larger area of land which has a fishery
development to the north currently under development. The site lies at the southeastern corner of
this much larger area under the ownership of the applicant. 
1.2 The site lies in a sweeping and undulating landscape and slopes gently down in a northerly direction.
As the site is rectangular and parallel to the road, it is relatively flat and consists of uncut grassland
and an existing agricultural access gate with a hedgerow along its southern boundary lining an
access track to a farmstead to the east. The proposed application site is approximately 96.6 metres
long and 21.4 metres deep forming a rectangular area of approximately 2067 square metres. 
2. Proposed Development 
2.1 The proposal is to form a smallholding using the existing access to form an access road along and
parallel to the southern boundary of the site. This access road would also have parking and turning
facilities at its eastern end serving a proposed single storey modular cabin with decking designed in
a similar way to a large static caravan with two bedrooms, a living area and toilet and kitchen
facilities. 
3. Applicant’s Supporting Information 
3.1 The applicant’s planning statement advances that the proposal is for a small modest smallholding with
associated chalet/cabin required in support of the keeping of farm animals and equestrian grazing.
The statement further submits that the proposal is rural in character, visually contained, functionally
linked to the land, compatible with smallholding and grazing activity and capable of integrating into the
existing countryside setting and, as such complies with the relevant policies. The main point
expounded is that the chalet is required to provide effective animal husbandry. 
4. Site History 
4.1 The application site has no directly relevant planning history although the greater site owned by the
applicant has the following including this application:- 
• 22/00407/FUL Use of land as coarse fishery with managers house, customer welfare unit, storage
containers, the construction of a coarse fishery pond, landscaping, infrastructure, area of hard
standing for ancillary parking and access 
• 23/00279/PRN Relocation of spoil material to adjoining land (prior notification) 
• 24/00084/FUL Holding pond to serve adjacent approved course fishery (granted approval under
planning permission 22/00407/FUL.
• 24/00948/FUL Two holiday lodges, fishery pond and associated infrastructure. 
• 25/01313/S42 Section 42 Application to vary Condition 1 (Approved Plans) and Condition 7 (lodge
occupation restriction) of Planning Permission 24/00948/FUL - Two Holiday Lodges, Fishery Pond
& Associated Infrastructure 
• 26/00602/FUL Formation of a smallholding with a residential lodge. 
Page 41 of 48

Page 42

5. Development Plan 
5.1 NPF4 forms part of the development plan. As such the proposed development requires to be
assessed against the provisions and policies of both NPF4 and The North Lanarkshire Local
Development Plan. The most relevant considerations some already enshrined in the North
Lanarkshire Local Development Plan policies are set out below.  This application can therefore be
considered against the policy provisions of the North Lanarkshire Local Development, and the
National planning Framework 4 as follows:- 
National Planning Framework 4 
The policies within NPF4 that are most relevant to the application are : 
• Policy 8 (Green belt)
• Policy 17 (Rural Homes)
• Policy 29 (Rural Development)
North Lanarkshire Local Development Plan 2022 
• PP 4 and AD 4 (Green Belt)
• EDQ 1 to 3 (Quality of Development)
5.2 The development plan now comprises National Planning Framework 4 and the North Lanarkshire
Local Development Plan, under which the site is designated as being within the Green Belt.  Policies
(including NPF4 Policy 17 - Rural Homes and NLLDP policies PP4 and AD4 - Green Belt) impose
restrictions on the construction of new houses (chalet/cabin) in the Green Belt. 
5.3 In considering this planning application for the proposed smallholding development, it should be
noted that the provisions of NPF4 Policy 8 significantly aligns with the local plan Green Belt policy
PP 4, the application of this policy can therefore be quickly asserted as equivalent in its intent to the
current policy position for assessment of this application. Policy 8 states that - a) Development
proposals within a green belt designated within the LDP will only be supported if: i) they are for: •
development associated with agriculture, woodland creation, forestry and existing woodland
(including community woodlands); • residential accommodation required and designed for a key
worker in a primary industry within the immediate vicinity of their place of employment where the
presence of a worker is essential to the operation of the enterprise, or retired workers where there is
no suitable alternative accommodation available; • horticulture, including market gardening and
directly connected retailing, as well as community growing; • outdoor recreation, play and sport or
leisure and tourism uses; and developments that provide opportunities for access to the open
countryside (including routes for active travel and core paths); • flood risk management (such as
development of blue and green infrastructure within a “drainage catchment” to manage/mitigate flood
risk and/or drainage issues); • essential infrastructure or new cemetery provision; • minerals
operations and renewable energy developments; • intensification of established uses, including
extensions to an existing building where that is ancillary to the main use; • the reuse, rehabilitation
and conversion of historic environment assets; or • one-for-one replacements of existing permanent
homes. and Part 2 – National Planning Policy ii) the following requirements are met: • reasons are
provided as to why a green belt location is essential and why it cannot be located on an alternative
site outwith the green belt; • the purpose of the green belt at that location is not undermined; • the
proposal is compatible with the surrounding established countryside and landscape character; • the
proposal has been designed to ensure it is of an appropriate scale, massing and external
appearance, and uses materials that minimise visual impact on the green belt as far as possible; and
• there will be no significant long-term impacts on the environmental quality of the green belt.
Page 42 of 48

Page 43

5.4 In considering this planning application for the proposed residential development, it should be noted
that the provisions of NPF4 Policy 17 significantly aligns the local plan Green Belt policy PP 4, the
application of this policy can therefore be quickly asserted as equivalent in its intent to the current
policy position for assessment of this application. Policy 17 states that - a) Development proposals
for new homes in rural areas will be supported where the development is suitably scaled, sited and
designed to be in keeping with the character of the area and the development: i. ii. iii. is on a site
allocated for housing within the LDP; reuses brownfield land where a return to a natural state has not
or will not happen without intervention; reuses a redundant or unused building; iv. is an appropriate
use of a historic environment asset or is appropriate enabling development to secure the future of
historic environment assets; v. is demonstrated to be necessary to support the sustainable
management of a viable rural business or croft, and there is an essential need for a worker (including
those taking majority control of a farm business) to live permanently at or near their place of work; vi.
is for a single home for the retirement succession of a viable farm holding; vii. is for the subdivision
of an existing residential dwelling; the scale of which is in keeping with the character and
infrastructure provision in the area; or viii. reinstates a former dwelling house or is a one-for-one
replacement of an existing permanent house. b) Development proposals for new homes in rural
areas will consider how the development will contribute towards local living and take into account
identified local housing needs (including affordable housing), economic considerations and the
transport needs of the development as appropriate for the rural location. c) Development proposals
for new homes in remote rural areas will be supported where the proposal: i. supports and sustains
existing fragile communities; ii. supports identified local housing outcomes; and iii. is suitable in
terms of location, access, and environmental impact. d) Development proposals for new homes that
support the resettlement of previously inhabited areas will be supported where the proposal: i. is in
an area identified in the LDP as suitable for resettlement; ii. is designed to a high standard; iii.
responds to its rural location; and iv. is designed to minimise greenhouse gas emissions as far as
possible. 
5.5 NPF 4 Policies 1,2, relating to the nature crisis and climate mitigation and 29 Rural Development that
the applicant sites in the submitted Planning Statement are assessed in paragraph 8.6 below. 
5.6 Policy PP 4 states that North Lanarkshire Council will support developments for agriculture, forestry,
recreation, or developments that need a non-urban location, including, where appropriate, Visitor
Economy related development. Where specified by this Policy, applicants will be expected to provide
the identified appraisals or assessments, which should be submitted with any planning application to
allow consideration of the proposal. The purpose of the Green Belt is to protect the setting of
communities, support regeneration by directing growth to urban areas, protect natural assets and
provide a high quality environment. North Lanarkshire Council will encourage development
appropriate for a Green Belt location by resisting development that is not for agriculture, forestry,
recreation, tourism, or needs a Green Belt location, whilst allocating appropriate land for urban
expansion. With regard to development that needs a Green Belt location, the need will be balanced
against any adverse effects on the purposes of the Green Belt. Assessment of Appropriateness of
any proposal for development (excluding Householder Development), or change of use, within the
Green Belt, should include, but not be limited to: • support by a business plan, or statement justifying
that the development is compatible with the Green Belt. • a statement that the proposal is not best
suited to being located in a Centre, or General Urban Area, taking the Town Centres First Sequential
Approach where appropriate. • a statement on the scale and nature of existing development in the
Green Belt (all proposals require to satisfy the provisions of all EDQ Policies). • evidence that there
is a specific locational requirement for the proposal. • evidence that the proposal will result in
significant economic benefit. • its impact on travel patterns and accessibility by sustainable modes of
transport (all proposals require to satisfy the provisions of Policy CI and Policy EDQ 3). The Council
will resist other forms of development, through the full range of Policies in the Plan. Any application
for planning permission will be subject to appropriate assessment of its impacts through the limits
defined in the Amount of Development policy. All proposed development will be subject to
assessment against relevant legislation and all other Policies in the Plan. 
Page 43 of 48

Page 44

5.7 Policy AD 4 (Amount of Development in the Green Belt) assesses the potential impact of Green Belt
appropriate uses. Where specified by this Policy, applicants will be expected to provide the identified
appraisals or assessments, which should be submitted with any planning application to allow
consideration of the proposal. Appropriateness refers to the nature and scale of the development
and whether it would be more appropriate in a Land Use Character Area designated for the size and
class of development proposed, or whether there are considerations which can be introduced to
justify that the development is appropriate for the Green Belt, supported by a business plan, or
statement. Assessment of amount of any development, or change of use within the Green Belt
should include, but not be limited to: • a statement on whether the proposal is an intensification of an
existing use. • its impact on land supplies, including all housing proposals over 10 units on the
Housing Land Supply. • evidence regarding the existence of suitable alternative sites. Development
not meeting these requirements will not be supported. 
5.8 Policies EDQ 1 and EDQ 3 (Quality of Development). 
Policy EDQ 1 states that any proposed development will require to be appraised in terms of the site
and its surroundings to ensure it will integrate successfully into the local area and avoid harm to
neighbouring amenity. The matters to be addressed in the appraisal include but are not limited to: •
massing, height, style, finishing materials of any building or buildings on the site and surrounding
Land Use Character Area • orientation and topography of the site and surrounding Land Use
Character Area • mixture of uses in the Land Use Character Area • building lines, plot ratios,
groupings, types of enclosure (e.g. fences, walls, hedges), landmarks in the Land Use Character
Area • public utilities, e.g. underground services (including the fibre network), drainage systems,
overhead power lines • public services available locally, e.g. schools, public transport,
play/recreation provision • accessibility by a range of sustainable transport modes • lighting - day,
night, seasonal variation of use, security arrangements, informal supervision • ground stability and
contamination on the site and surrounding Land Use Character Area • existence and quality of
connections and access including site and building entrances, roads, paths and visuals on the site
and surrounding Land Use Character Area • Green Network, landscape character and quality on the
site and surrounding Land Use Character Area • impacts associated with the holistic water
environment and flood risk • biodiversity of plants and animals on the site and surrounding Land Use
Character Area • heritage, or amenity value of buildings or structures above or below ground on the
site and surrounding Land Use Character Area • the character and scale of any building clusters in
rural areas • the nature and types of features to be safeguarded or enhanced on the site and
surrounding Land Use Character Area • requirement for any additional assessments on the site and
surrounding Land Use Character Area • the potential for a proposed development (particularly
business uses) to co-locate and integrate with existing or proposed energy and waste innovations •
the potential for installation and operation of low and zero-carbon generating technologies in new,
refurbished or re-purposed buildings. • the existence of and impact of or on “Bad Neighbour”
Development on the site and surrounding Land Use Character Area. Bad Neighbour uses are
defined in Statutory Instrument 1992 No.224 (S.18) of the Town and Country Planning (General
Development Procedure) (Scotland) Order 1992 Schedule 7.
5.9 Policy EDQ 3 states that development will only be permitted where high standards of site planning
and sustainable design are achieved. Planning Applications will need to demonstrate that the
proposed development takes account of the site appraisal carried out as a requirement of Policies
EDQ 1 a. It further states that any development should successfully address siting; overall layout;
density; form; scale; height; massing; proportion; detailing; colour; materials. b. Providing a safe,
pleasant, inclusive, convenient and welcoming development addressing: personal safety, security
and crime prevention; adaptability (including, as appropriate, to the effects of Climate Change and
for residential development for specialist provision); sustainable, safe, secure, and convenient
access into and through the development that is easy to move around, attractive to pedestrians,
cyclists, and people with disabilities; integration with public transport, green networks and wider
Page 44 of 48

Page 45

links; sustainable access for cars where required, being safe for all road users, and appropriate
parking or traffic calming being well located and integrated.
6. Consultations
6.1 The Coal Mining Remediation Authority has expressed no objection to the proposal on the
assumption that the proposed lodge does not require significant groundworks or foundations. 
6.2 North Lanarkshire Council Traffic & Transportation has expressed no objections provided that the
applicant is reminded that they have a responsibility to provide an appropriate drainage system on
site which satisfies Scottish Water and SEPA criteria and ensures that surface water from the site
does not drain onto the public road. Also, in terms of access visibility splay, the hedge and fence to
the west of the access must be lowered to a maximum height of 1 metre and not allowed to grow
above this height or the fence and hedge be repositioned behind the visibility splay in the interests of
road safety. 
6.3 North Lanarkshire Council Environmental Health (including Pollution Control) has commented that
the site is located in a high-risk area for ground gas. Therefore, to ensure potential risks arising from
previous land uses around the site have been fully assessed, before the development starts the
either of the following is required: The submission of a detailed mine ground gas risk
assessment. This report must include development of an initial schematic conceptual site model
(CSM) in line with CL:AIRE 2021 recommendations and national guidance. Depending on the
findings of the assessment a detailed remediation strategy may be required. Any remediation work
required must be completed and verification provided by the developer to the satisfaction of the
Local Authority.or The installation of a CS3 membrane in accordance with CIRIA 735. If this is
the chosen option we would require a proposal to be submitted, including detail/drawings in respect
of the proposed membrane / installation and a suitable verification strategy. However, it is
envisaged, that if no significant ground breaking is involved then this would not be required. 
6.4 North Lanarkshire Council Greenspace has provided no response – but it is noted that the site has
no specific nature conservation designations. 
7. Representations
7.1 As a result of the neighbour notification process and the advertisement placed in the Airdrie and
Coatbridge Advertiser on the 24th of June, eight representations of objection have been received.
The points raised can be summarised as follows:- 
Objection points 
• Loss of privacy - that would be caused by a new dwelling at the location. 
Response: This is not considered to be an issue due to the relative distances involved. There may be
a perception that this is the case due to the rural context of the site. 
• Road safety issues - Increased traffic leading to road safety issues. The access point is at a well
known accident black spot. Access to Meadowfield Farm is on a blind bend. The proposed access
would share this access. Farm road used daily by heavy agricultural vehicles. 
Response: North Lanarkshire Council Traffic & Transportation has expressed no objections
provided that the applicant is reminded that they have a responsibility to provide an appropriate
drainage system on site which satisfies Scottish Water and SEPA criteria and ensures that surface
water from the site does not drain onto the public road. Also, in terms of access visibility splay, the
hedge and fence to the west of the access must be lowered to a maximum height of 1 metre and not
allowed to grow above this height or the fence and hedge be repositioned behind the visibility splay
in the interests of road safety. 
Page 45 of 48

Page 46

• Possible impact on existing agricultural operation at Meadowfield Farm. 
Response: Due to the small scale of the proposal this is not considered to be an issue. 
• Future Residential Amenity - Dung Midden 20 metres from proposed dwelling and cattle shed 200
metres from proposed dwelling. This is likely to lead to detrimental impact on the residential amenity
of any future residents through odour. Also, this would be further exacerbated by early morning and
seasonal work. 
Response: Agreed. 
• Impact on rural character - Development not in keeping with rural surroundings. 
Response: The proposed dwelling would be prominent from the north without the benefit of
appropriate screen planting but should be more hidden on the southern boundary due to existing
hedgerows.  
• Viability and necessity for dwelling – ‘The proposed smallholding is very small at only 0.4 Hectares
and only suitable for a handful of chickens or perhaps a Llama or some ducks’. Suspect the proposal
is a Trojan Horse type scenario for future bigger residential development. ‘There is no justification for
a dwelling other than someone wanting to live there. The entire site is just over 1 acre, removing the
dwelling and yard it’s not much more than a large garden. The site size falls below the Scottish
Government agricultural minimum holding size. For context recognised for 1 acre = 1 cow or 6 sheep
or 12 geese. The proposed site would also be severely limited for any equestrian use’. 
‘The proposed development introduces a residential lodge into an open rural location where it would
not appear to be justified by any genuine agricultural or operational need. The scale of the proposed
smallholding raises questions as to whether it is capable of supporting a viable agricultural enterprise
requiring an on-site dwelling. Ther proposal therefore risks creating an isolated residential
development in the countryside rather than accommodation that is genuinely necessary for rural land
management’. 
Response: The above is noted and agreed. It is considered that the site is not big enough to support
a viable smallholding business or therefore to justify a permanent dwelling. 
• Disregard for Wildlife and Woodlands - Mature woodland within metres of the proposed
development with no arboricultural or ecological impact reports shows disregard for existing wildlife
and woodland surroundings. 
Response: This is noted but as this is not on the site, the development would be unlikely to impact on
this. 
• Curlew and Lapwing nest in the hayfield adjacent to the site. We have traditionally not cut this
field until later in the season for this reason. 
Response: This is noted but as this is not on the site, the development would be unlikely to impact on
this. 
8. Planning Assessment 
8.1 Section 25 of the Town and Country Planning (Scotland) Act 1997 requires that applications for
planning permission be determined in accordance with the policies of the development plan unless
material considerations indicate otherwise. The Development Plan now consists of the North
Lanarkshire Local Development Plan and the National Planning Framework 4 (NPF 4). Accordingly,
the proposed development requires to be assessed against the provisions and policies of both NPF4
and the North Lanarkshire Local Development Plan. The application site is designated Green Belt
within the North Lanarkshire Local Development Plan 2022 (NLLDP). 
Page 46 of 48

Page 47

8.2 In terms of NPF4, Policy 8 (Green belt) and Policy 17 (Rural Homes) are most relevant. Policy 8
states that - a) Development proposals within a green belt designated within the LDP will only be
supported if they are for development associated with agriculture, woodland creation, forestry and
existing woodland (including community woodlands); residential accommodation required and
designed for a key worker in a primary industry within the immediate vicinity of their place of
employment where the presence of a worker is essential to the operation of the enterprise, or retired
workers where there is no suitable alternative accommodation available and amongst other things
horticulture, including market gardening.
In this case, it is considered that the proposed development does not comply with the above criteria.
In terms of a possible rural justification, the small scale of the site and smallholding does not
represent a viable business prospect in the Green Belt. Although there are no specific minimum size
standards for small holdings, the Scottish Government guidance states that smallholdings typically
operate on 20 hectares (50 acres) and government grants are available for smallholdings of between
3 and 30 hectares with off farm incomes. This gives a context to assess the scale and potential
viability of the proposal. It is therefore considered that the proposal cannot justify full time habitation
(in the form of a dwelling/chalet) and as such cannot comply with the related criteria (the first three
bullet points above). For the same reason, it is considered that the proposal does not comply with
North Lanarkshire Local Development Plan 2022 (NLLDP) Policies PP4 and AD4 (Green Belt).
8.3 Policy 17 (Rural Homes) states that – 
a) Development proposals for new homes in rural areas will be supported where the development is
suitably scaled, sited and designed to be in keeping with the character of the area and the
development, amongst other things : 
i. is on a site allocated for housing within the LDP; 
ii. reuses brownfield land where a return to a natural state has not or will not happen without
intervention; 
iii. reuses a redundant or unused building; 
iv. is an appropriate use of a historic environment asset or is appropriate enabling development to
secure the future of historic environment assets; 
v. is demonstrated to be necessary to support the sustainable management of a viable rural
business or croft, and there is an essential need for a worker (including those taking majority control
of a farm business) to live permanently at or near their place of work; 
vi. is for a single home for the retirement succession of a viable farm holding; 
vii. is for the subdivision of an existing residential dwelling; the scale of which is in keeping with the
character and infrastructure provision in the area; or viii. reinstates a former dwelling house or is a
one-for-one replacement of an existing permanent house. 
8.4 Whilst the proposal is for a single chalet/dwelling in the Green Belt associated with a proposed
smallholding, it is considered that the proposal does not comply with criteria (i to vii). It is considered
that it does not comply with the other criteria and most notably that it is not on a site allocated for
housing within the LDP. Furthermore, it is considered that the proposal is not compatible with the
surrounding established countryside and landscape character. 
Page 47 of 48

Page 48

8.5 Policies EDQ 1 and EDQ 3 (Quality of Development). Policies EDQ 1 and 3 state that any proposed
development will require to be appraised in terms of the site and its surroundings to ensure it will
integrate successfully into the local area and avoid harm to neighbouring amenity. In terms of
landscape impact, orientation and topography of the site and the surrounding Land Use Character
Area should be taken into account. In this case, it is considered that the proposal without the benefit
of buffer planting will be prominently exposed when viewed from the north and therefore does not
comply with policies EDQ1 an EDQ3.
8.6 In terms of NPF 4 Policies 1,2, relating to the nature crisis and climate mitigation and 29 Rural
Development that the applicant sites in the submitted Planning Statement, it is considered that the
proposal has the potential to comply with policies 1 and 2, however little has been provided in terms
of proposed elements that would support this. In terms of Policy 29 (Rural Development) supports
proposals that contribute to the viability and diversity of rural communities and rural economy. In this
case, for the reasons covered in paragraph 8.2 above that in terms of a possible rural justification,
the small scale nature of the site and smallholding does not represent a viable business prospect in
the Green Belt and can therefore not justify full time habitation (in the form of a dwelling/chalet) and
as such cannot comply with the related criteria (the first three bullet points in paragraph 8.2 ) namely
:- 
• development associated with agriculture, woodland creation, forestry and existing woodland
(including community woodlands); 
• residential accommodation required and designed for a key worker in a primary industry within the
immediate vicinity of their place of employment where the presence of a worker is essential to the
operation of the enterprise, or retired workers where there is no suitable alternative accommodation
available; 
• horticulture, including market gardening and directly connected retailing, as well as community
growing.
The proposal is therefore considered to be contrary to Policy 29.
9. Conclusions 
It is therefore concluded that the proposal does not comply with NPF4 Policies 8 (Green belt) and
Policy 17 (Rural Homes) and 29 (Rural Development). It is further considered that the proposal does
not comply with North Lanarkshire Local Development Plan 2022 policies PP 4 and AD 4 (Green
Belt) and EDQ 1 to 3 (Quality of Development). This application is therefore recommended for
refusal.
Page 48 of 48