Page 1

Clerk Name: Clare Louise McDonald
Clerk Telephone: 07350 435308
Clerk Email: committee@northlan.gov.uk
27 January 2026
Members of the
Planning Committee
Chief Executive’s Office
Rachel Blair
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk
Notice is given that a Meeting of the Planning Committee is to be held in the Council
Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Thursday, 05 February
2026 at 10:00 AM which you are requested to attend.
The agenda of business is attached.
Rachel Blair
Chief Officer (Legal & Democratic)
Members :
N Shevlin, G Currie, A Beveridge, B Burgess, A Bustard, J Cairns, M Coyle, S Coyle, K
Docherty, A Duffy-Lawson, T Fisher, M Hughes, L Jarvie, T Johnston, J Keltie, J Logue, H
Loughran, J McLaren, C McManus, M McPake, A McVey, L Mitchell, D Robb, A Smith, G
Woods.
Page 1 of 42

Page 2

Page 2 of 42

Page 3

Agenda
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000
2 Planning Applications Index
Submit Index
5 - 26
3 Planning and Place Performance Report 2024-2025
Submit report by the Chief Officer (Place)providing
feedback from the National Planning Improvement
Coordinator on the outcome of the Annual Report and
updating on the performance of the service against the
key performance indicators for 2024-25.
27 - 34
4 Notice of Planning and Enforcement Appeals
Lodged
Submit report by the Chief Officer (Place) advising of
Planning Appeals recently lodged with the Scottish
Ministers.
35 - 38
5 Notice of Planning and Enforcement Appeals
Decisions
Submit report by the Chief Officer (Place) advising of a
recent decision in respect of Planning Appeals.
39 - 42
Page 3 of 42

Page 4

Page 4 of 42

Page 5

North
Lanarkshire
Council
Planning Applications for consideration     
of Planning Committee
Committee Date: 5th February 2026
Ordnance Survey maps reproduced from Ordnance Survey
with permission of HMSO Crown Copyright reserved
Item 2
Page 5 of 42

Page 6

APPLICATIONS FOR PLANNING COMMITTEE
5th February 2026
Page
No
Application No Applicant Recommendation
7 23/01328/FUL Mr Daniel
Lowden
Refuse
17 24/01205/FUL PP Builders
& Son Ltd
Grant
Development/Site
Subdivision of
Existing Building into
4 Units and Change
of Use of 
Sui Generis to Class
5 and Construction
of Building
Containing 3 Units
(Classes 4 & 6)
Holytown Road
Holytown
ML4 1EE
Use of Premises as
Builder's Yard and
Construction of
Storage Building 
(In Retrospect)
31A Rothesay
Crescent Shawhead
Coatbridge
ML5 4JP 
Page 6 of 42

Page 7

Application No:  
23/01328/FUL
Proposed Development: 
Subdivision of Existing Building into 4 Units and Change of Use
of Sui Generis to Class 5 and Construction of Building Containing
3 Units (Classes 4 & 6) 
Site Address: 
Holytown Road
Holytown
ML4 1EE 
Date Registered: 
17th January 2024 
Applicant:
Mr Daniel Lowden
351 High Street
Motherwell
ML1 5HR 
Agent:
Architectural Design Practice Ltd
166 Park Street
Motherwell
ML1 1PF 
Application Level:
Local Application 
Contrary to Development Plan:
No
Ward:   
16 Mossend and Holytown 
Jim Reddin,Beth Baudo,Helena Gray
Representations:
8 letter(s) of representation received.   
Recommendation: Refuse 
Reasoned Justification: 
It is considered that the proposed change of use, scale and layout of the development are
contrary to the policies and criteria set out in the development plan. Whilst the proposed
change of use and workshop units have the potential to be acceptable due to the site being an
existing car repair garage, it is considered that the proposed units are intensification of the
existing use class considering the proposed development’s deemed impact on pedestrian and
traffic safety grounds. The proposed workshop units would also likely have a detrimental
impact on the amenity of neighbouring dwellings due to potential impact on noise sensitive
receptors, and the proposed development has not demonstrated this impact will be effectively
mitigated. It is therefore recommended that planning permission be refused 
Page 7 of 42

Page 8

Reproduced by permission of
the Ordnance Survey on
behalf of HMSO. © Crown
Copyright and database right
2009.  All rights reserved.
Ordnance Survey Licence
number 100023396.
Planning Application: 23/01328/FUL 
Name (of applicant): Mr Daniel Lowden
Site Address: 
Holytown Road
Holytown 
ML4 1EE 
Development: Subdivision of Existing
Building into 4 Units and Change of Use
of Sui Generis to Class 5 and
Construction of Building Containing 
3 Units (Classes 4 & 6)   
Page 8 of 42

Page 9

Recommendation:  Refuse for the Following Reasons: - 
1. The proposed development is contrary to policy 14 (Design, Quality and Place) of NPF4, along with
policies PP 3 (Purpose of Place) and EDQ 1-3 (Environmental Development Qualities). This is due
to the lack of competent information on assurance of traffic and pedestrian safety as it has not been
successfully demonstrated that articulated HGV’s vehicles can safety enter and exit the site as per
the required turning manoeuvres. 
2. The proposed development is contrary to policy 14 (Design, Quality and Place) of NPF4, along with
policies PP 3 (Purpose of Place) and EDQ 1-3 (Environmental Development Qualities). This is due
to lack of competent information in relation to the noise impact assessment, as it has not been
demonstrated that noise from the proposed units will not have an adverse impact on the amenity of
nearby residential properties given the use of units are currently unknown. 
Background Papers: 
Consultation Responses: 
NLC Pollution Control (Environmental Health) received on 28th February 2024, 21st May 2025, 14th January
2026
NLC Food Safety/Business Regulations received on 9th May 2024
NLC Estates received on 13th May 2024, 22nd April 2025
NLC Infrastructure & Transportation received on 13th March 2024, 29th May 2025
Network Rail received on 22nd January 2024, 24th April 2025 
Contact Information: 
Any person wishing to inspect these documents should contact Joe Gannon at
planningenquiry@nortlan.gov.uk or 01236 632487. 
Report Date: 
16th January 2026 
Page 9 of 42

Page 10

APPLICATION NO. 23/01328/FUL 
REPORT 
1. Site Description 
1.1 The application site comprises of an existing commercial property and yard (approximately 0.2
hectares in size) equidistant between Holytown and Mossend. The site previously operated as a used
car dealership and garage. The land to the south of the site is currently vacant, brownfield land. The
surrounding land is largely mixed-use, which includes a railway track leading to Mossend rail freight
terminal, new-build residential properties (circa 2021) which are two storeys in height, commercial
properties including a tyre repair shop and car wash, industrial manufacturer, and open green space. 
1.2 During the course of the application, a large amount of works had taken place on-site including a
trench being dug and caravans currently being in situ. These works were subject to an ongoing
enforcement case (25/00084/COMP); however, it was established that the activities were permitted
development. 
2. Proposed Development 
2.1 The proposed development comprises of subdividing the existing building into 4 units and construction
of 3 terraced units in the south section of the site. The existing property (Units 1-4) which is currently
vacant as stipulated within the planning statement, is characterised by a mixture of facing stonework
and timber, as well as concrete roof tiling. In addition to the internal subdivision, there are external
alterations proposed which includes infilled doors and new roller shutter doors to separate the different
units. 
2.2 The proposed units (5-7) will have a total footprint of approximately 131m2. The full details of the facing
materials to be used on the external walls and roofing are not specified within the application. There
is also no new artificial lighting proposed as part of the development, and no section/level drawings
have been submitted to fully assess the proposed development’s deemed impact on neighbouring
residential properties in terms of scale. There is also no information on any proposed boundary
treatment for the site. 
2.3 The operation hours and days of the site are Monday to Friday 0800 – 1800 and Saturday to Sunday
0800 – 1200 and would be restricted as such. Whilst the use of the units is currently unknown and will
be leased should the application be granted; Units 1-4 will be restricted to Class 5 (General industry)
which is the existing use class of the property, and Units 5-7 will be restricted to Class 4 (Business)
and Class 6 (Storage or distribution). 
2.4 There are 17 parking spaces proposed in total within the application site, with each space measuring
approximately 6 x 2.5m each. This will provide the proposed development with an average of 2.5
spaces per workshop unit. The proposed development will be accessible via an existing entrance off
Holytown Road. 
3. Applicant’s Supporting Information 
3.1 Supporting information includes the following documents: Supplementary Statement, Supporting
Statement, Noise Impact Assessment (3 versions), and Transport Statement. 
3.2 A supporting and supplementary statement prepared by the applicant was submitted in support of the
application. The supporting statements detail the context of the application, stipulating that there are
insufficient properties to satisfy the demand for commercial and light industrial businesses. The
statements also detail the site history, as well as the benefits the proposed development would bring
to the area. As aforementioned, the statement also details the proposed operation days and hours of
the units. The content of the statements and justification for the proposed development is largely
acceptable. 
Page 10 of 42

Page 11

3.3 Prepared by The Airshed (November 2025), the applicant has also provided a noise impact
assessment. This submission follows a previous assessment undertaken by Noise Assessments Ltd
(August 2024 and revised March 2025), which was deemed insufficient by NLC Pollution Control
following consultation due to limited information to accurately characterise the potential noise impact
from the proposed development. The NIA identifies several noise sensitive receptors which will be
impacted by the proposed development, where the proposed development has potential to have an
adverse impact on the amenity of these properties. Given the tenancies of the units are currently
unknown, the assessment has been carried out on a worst-case scenario basis. Whilst the report
concludes that impacts are low subject to proposed mitigation, the proximity to existing residential
properties and modelling uncertainty due to the unknown use of properties represent material planning
concerns and are likely to have an impact on the amenity of neighbouring properties. 
3.4 A Transport Assessment (TA) was also prepared and submitted by Dougall Baillie Associates
(February 2025), to aid and address initial concerns raised by NLC Infrastructure & Transportation
when initially consulted in March 2024. As stipulated within the TA, it is demonstrated that the proposed
development is well situated in terms of sustainable modes of transport and the wider area of Mossend,
it will generate a negligible amount of traffic on the existing road network and meets the council’s
standards for parking provision. As demonstrated by NLC Infrastructure & Transportation, the
applicant has been unable to demonstrate the required visibility splays to accommodate articulated
vehicles due to existing access constraints, as requested by NLC Infrastructure & Transportation.
Whilst the supporting statement stipulates that no articulated HGV’s will be permitted on-site due to
there being insufficient turning within the site, the future operators of the site have no control over how
and when deliveries will be undertaken, emphasised by the use class of the units being unknown. This
can also not be covered by a planning condition as suggested by the applicant as it is not enforceable
in planning terms, thereby not meeting one of the 6 tests for planning conditions. 
3.5 The proposed development could therefore lead to inappropriate vehicles manoeuvres on Holytown
Road as well as HGV’s using Holytown Road as an opportunity to park on the pavement causing a
visibility issue, which raises concerns regarding traffic and pedestrian safety. It is considered that the
proposed development is an intensification of the existing use of the site considering NLC
Infrastructure and Transportation’s objection on pedestrian and traffic safety grounds. 
4. Site History 
• 08/00330/PREAPL residential development (COM – Comments)
• 09/00946/FUL Erection of Single Storey Dwellinghouse (WDN – Withdrawn)
• 10/00068/FUL Erection of a Single Storey Dwellinghouse (REF – Refused)
• 10/00941/FUL Erection of Dwellinghouse (REF – Refused)
• 19/00878/PPP Residential development in principle (ALLOW – Appeal Allowed) 
5. Development Plan 
5.1 National Planning Framework 4: 
1 (Tackling the climate and nature crises)
2 (Climate mitigation and adaptation)
3 (Biodiversity)
9 (Brownfield, vacant and derelict land and empty buildings) 
14 (Design, quality and place) 
26 (Business and industry) 
North Lanarkshire Local Development Plan 2022 (LDP): 
General Urban Area: 
- PP 3 Purpose of Place 
- AD 3 Amount of Development 
Environmental Development Qualities (EDQ) 1-3 
Page 11 of 42

Page 12

6. Consultations 
6.1 NLC Estates – have raised no objections to the proposal in principle 
6.2 NLC Protective Services (incl. Pollution Control) – requested that a Noise Impact Assessment
should be undertaken as well as any associated impact and mitigation measures proposed due to
the proposed development’s potential adverse impact on the adjacent residential properties. A Light
Impact Assessment was also requested to be carried out which seeks to compare predicted and
existing lighting levels for noise sensitive receptors. However, the applicant has confirmed as per the
supporting statement that no artificial lighting will be proposed as part of the development. 
Several noise impact assessments have been submitted for consideration with the most recent in
November 2025. However, after assessing these reports NLC Pollution Control have found there
have been various shortcomings in respect to methodology and how this matter has been assessed.
The applicant has therefore not adequately demonstrated that noise can be effectively mitigated and
NLC Pollution Control have objected to the application on this basis. 
The applicant submitted the NIA which was carried out on the 20th of March 2025. Several
substantive issues were identified by NLC Pollution Control, who maintained their existing objection
to the proposed development on the basis that insufficient information had been submitted to
confidently assess and characterise the potential noise impact from the workshop units. In response
to this, the applicant submitted a revised Noise Impact Assessment carried out by an acoustic
consultant in November 2025. The revised report fails to meet the requirements of NLC Pollution
Control on several grounds in terms of clarity on operation days and hours, sound frequency,
prediction modelling and calculation methodology. As such, the potential noise impact and mitigation
for sensitive receptors have been presented insufficiently. Should the planning application be
approved, a revised Noise Impact Assessment would be required for the consideration of the Local
Planning Authority. 
6.3 NLC Infrastructure & Transportation – have provided a response following consultation,
requesting that the application be deferred until sufficient parking spaces are incorporated within the
site, as well as requesting the applicant to demonstrate adequate turning manoeuvres for articulated
HGV’s. The applicant provided a transport statement in response to their comments (February
2025). Having reviewed the statement, NLC Infrastructure & Transportation requested that the
tracking diagrams for rigid HGVs are re-examined with additional requirements (e.g., full width of
carriageway and entering and exiting demonstrated) and reiterating previous concerns that the
applicant has no control over whether articulated HGVs enter the site. This can also not be
controlled by a planning condition as it does not meet one of the tests of planning conditions as it
would not be enforceable. 
It was suggested that the applicant provide this information to aid assessment of the application in
terms of traffic and pedestrian safety. This has not been carried out. The applicant has therefore not
adequately demonstrated that the proposed development can accommodate adequate turning
manoeuvres for articulated HGVs and NLC Infrastructure & Transportation have objected to the
application on this basis. Therefore, the proposed development is considered an intensification of the
existing use in light of these concerns. 
6.4 NLC Food Safety/Business Regulations – have raised no objections to the proposal in principle. 
6.5 Network Rail – have raised no objections to the proposal in principle regarding proximity to an
existing railway line. 
Page 12 of 42

Page 13

7. Representations 
7.1 Following a second standard neighbour notification (22nd April 2025) and press advert (31st January
2024), 8 letters of representation were received, all of which have objected to the proposal in principle.
The comments received are summarised as follows: 
• Height of units will exceed boundary fence with residential properties
• Adverse impact on privacy
• Noise, disruption and light pollution, as well as odours
• Sunlight/daylight impacts 
• Not in-keeping with building materials/appearance of estate
• Safety and security issues
• Increased vermin
• Site currently in operation during incongruous hours
• Proposed development cannot be formally assessed given tenancies are unknown
• Increased traffic 
8. Planning Assessment 
8.1 Under the terms of Section 25 of the Town and Country Planning (Scotland) Act 1997, planning
decisions must be made in accordance with the development plan unless material considerations
indicate otherwise. The development plan comprises of National Planning Framework 4 and the North
Lanarkshire Local Development Plan (2022), with the former taking precedence in the event of any
conflict between policies. 
8.2 In terms of National Planning Framework 4 (NPF4), the most notable policies relevant to the proposal
include Policies 1 (Tackling the climate and nature crises), 2 (Climate mitigation and adaptation), 3
(Biodiversity) 9 (Brownfield, vacant and derelict land and empty buildings); 14 (Design, quality and
place); and 26 (Business and industry). 
8.3 Policies 1 and 2 of NPF4 overlap and can be reasonably assessed together. The Scottish Government
issued draft guidance on this policy in December 2024, emphasising that NPF4 should be read as a
whole and that various other policies are closely related to Policy 1 and 2 specifically. 
8.4 Policy 1 (Tackling the climate and nature crises) seeks to encourage, promote and facilitate
development that addresses the global climate emergency and nature crisis. Policy 2 (Climate
mitigation and adaptation) seeks to encourage, promote and facilitate development that minimises
emissions and adapts to the current and future impacts of climate change. The development would
lead to increased carbon emissions both during the construction and operational phases without
evidence to demonstrate that the associated climate change effects could be mitigated or significantly
outweigh by the socio-economic benefits. In the absence of information to justify this location and
mitigate the effects of climate change, it is considered that the proposed development is contrary to
the provisions of Policies 1 and 2. 
8.5 Policy 3 (Biodiversity) seeks to protect biodiversity, reverse biodiversity loss, and deliver positive
effects from development and strengthen nature networks. The main body of the site appears to be of
poor value in terms of biodiversity. Trees and shrubs should be retained and protected during the
construction period and in the long-term where possible if no additional planting is proposed. It is
considered that the proposed development neither complies nor does not comply with the provisions
of Policy 3. 
8.6 Policy 9 (Brownfield, vacant and derelict land and empty buildings) seeks to encourage, promote and
facilitate the reuse of brownfield, vacant and derelict land and empty buildings, and to help reduce the
need for greenfield development. Given the development proposal would result in the sustainable
reuse of a vacant building it is considered that the proposed development complies with the provisions
of Policy 9. 
Page 13 of 42

Page 14

8.7 Policy 14 (Design, Quality and Place) seeks to encourage, promote and facilitate well designed
development that makes successful places by taking a design-led approach and applying the Place
Principle. It is considered that the development proposal’s design does not improve the overall quality
of an area and is inconsistent by the six qualities of successful places as identified by NPF4, by
intensifying the existing use class of the property and application site without improving the existing
access facilities and having an adverse impact on noise sensitive receptors. Therefore, it is considered
that the proposed development is contrary to the provisions of Policy 14. 
8.8 Policy 26 (Business and industry) seeks to encourage, promote and facilitate business and industry
uses and to enable alternative ways of working such as home working, live-work units and micro-
businesses. It is considered that the proposed development of general industrial uses within the
General Urban Area is not incompatible with the nature and scale of the surrounding area, given the
site was used previously for vehicular repair garage. Therefore, it is considered that the proposed
development complies with the provisions of Policy 26. 
8.9 The site is also designated within the General Urban Area in the North Lanarkshire Local Development
Plan (2022), where PP 3 (Purpose of Place) is relevant. This policy seeks to maintain and improve the
level of amenity in urban areas, by encouraging development that is in keeping with their residential
character and encouraging diversity in more mixed-use areas. It is considered that the principle of the
development is acceptable, however, as set out below, in the below paragraphs of 8.10, the
development does not meet the requirements of EDQ 1-3 and as such the application cannot be
supported at this time. 
8.10 LDP Environmental and Design Qualities Policies 
EDQ 1 – Site Appraisal 
EDQ 2 – Specific Features for Consideration 
EDQ 3 – Quality of Development 
These three policies look for proposed developments to create a successful place or enhance existing
places by integrating successfully into the local area and avoiding harm to neighbouring amenity. To
do this a range of criteria is listed within these policies which includes amongst other things aspects
of design, massing, materials, topography and aspects to protect the existing urban area and its
specific characteristics, assets and attributes. They consider hazardous zones, utilities infrastructure
and management areas and look to promote biodiversity and the environment whilst meeting the
challenges of climate change via suitable and safe access for all users to promote sustainable public
travel or for example the provision of electrical charge points where the car is still a requirement. 
8.11 Policy EDQ 1 (Site Appraisal) and Policy EDQ 3 (Quality of Development) require development to
provide suitable safe access including site entrances, roads, paths and visibility splays to the site. The
proposed development would be accessed from an existing entrance/exit on Holytown Road.
However, no evidence has been submitted to show appropriate turning manoeuvres for articulated
HGVs as required by NLC Infrastructure & Transportation following consultation. No further evidence
has been provided to demonstrate that the required visibility splays (4.5m by 60m) can be achieved in
each direction. Due to manoeuvring challenges and the absence of the require visibility splays, it is
unlikely that any articulated HGVs could enter or exit the site safely and in forward gear without
potentially endangering vulnerable pedestrians, road users and other vehicles. Given NLC
Infrastructure & Transportation requested that the application is deferred pending this information
being required in respect to visibility splays and turning manoeuvres, in its current form, the proposed
access off Holytown Road is unacceptable and for that reason fails to meet the requirements of
Policies EDQ 1 and EDQ 3 of the LDP. 
8.12 Policy EDQ 3 (Quality of Development) requires development to demonstrate how noise impacts will
affect the amenity of noise sensitive receptors in achieving sustainable design and high standards of
site planning. The applicant has been unable to demonstrate that the development itself is unlikely to
generate unacceptable levels of noise for the adjacent residential properties nor proposed acceptable
mitigation measures. Furthermore, given the use of the workshop units is not currently known and that
they are to be leased, it is considered that the Noise Impact Assessment does not sufficiently and
confidently characterise the potential noise impact from the proposed development. The proposed
development therefore fails to address the policy provisions of Policy EDQ 3.
Page 14 of 42

Page 15

8.13 Representations 
8.14 In response to the grounds of representation, these are commented on in the same order as they
appear above and the respective responses should be noted. 
8.15 Comment: Height of units will exceed boundary fence with residential properties 
Response: There is no statutory requirement in planning terms that any new development will not
exceed the height of an existing boundary treatment. The proposed workshop units were assessed in
terms of their scale and are considered broadly acceptable 
8.16 Comment: Adverse impact on privacy 
Response: It is considered that reusing the existing building and the proposed units facing away from
the residential properties, the privacy situation is deemed to be largely indifferent from how the site
was used previously. 
8.17 Comment: Noise, disruption and light pollution, as well as odours 
Response: NLC Pollution Control were consulted on the application in relation to potential increased
noise levels and confirmed that a Noise Impact Assessment should be undertaken to fully assess the
development. Following review of the Noise Impact Assessment, they confirmed that the presumed
noise levels from the workshop units would have an adverse impact on the amenity of neighbouring
residential properties, regardless of the restricted operational days of the workshop units. 
8.18 Comment: Sunlight/daylight impacts 
Response: It is considered that the size of the proposed units and distance from neighbouring
residential properties will not result in any adverse impacts on sunlight/daylight levels currently enjoyed
by neighbouring properties. 
8.19 Comment: Not in-keeping with building materials/appearance of estate 
Response: The design of the proposed workshop units are considered broadly acceptable. However,
the choice of materials would be covered by a pre-commencement condition should the application be
approved. 
8.20 Comment: Safety and security issues 
Response: Increased criminal activity because of a development is not a specific material planning
consideration and would be a policing matter. 
8.21 Comment: Increased vermin 
Response: Planning has no control over an increase in vermin because of such a development. If
such issues do occur, this would be a matter to be addressed under environmental health legislation. 
8.22 Comment: Site currently in operation during incongruous hours 
Response: The existing operation hours and days of the site is not a consideration for the current
application, it is the proposed operation that is being assessed in terms of acceptability. 
8.23 Comment: Proposed development cannot be formally assessed given tenancies are unknown 
Response: The application has been assessed in terms of the proposed use classes for the site, and
therefore whilst the use of the units is unknown, the proposed development has been assessed on a
worst-case basis in terms of impact on neighbouring amenity. 
Page 15 of 42

Page 16

8.24 Comment: Increased traffic 
Response: Following consultation with NLC Infrastructure & Transportation, aided by a transport
statement, it is considered that the additional volume of traffic forecasted by the proposed development
would not have such an impact as to warrant refusal of planning permission. However, that the
implications on the existing access for articulated HGVs would warrant refusal of planning permission. 
9. Conclusions 
9.1 Whilst it is noted that the proposed development is located within an area designated as General
Urban Area (PP 3) where mixed-use development is encouraged, given there is insufficient and
inadequate information to assess the impact of noise in the area and whether articulated HGVs can
safely access/egress the site, a competent decision on the impact and accessibility of the development
cannot be made at this time. Therefore, the proposal is contrary to multiple policies of NPF4 and North
Lanarkshire Local Development Plan (2022) and it is considered that any material considerations have
been demonstrated to justify a departure from these policies. As such, it is therefore recommended
that planning permission be refused. 
Page 16 of 42

Page 17

Application No:  
24/01205/FUL
Proposed Development: 
Use of Premises as Builder's Yard and Construction of Storage
Building (In Retrospect) 
Site Address: 
31A Rothesay Crescent
Shawhead
Coatbridge
ML5 4JP 
Date Registered: 
27th November 2024 
Applicant:
PP Builders & Son Ltd
F.A.O. Mr Patrick Pyott
PP Builders & Son Unit
Rothesay Crescent
Shawhead
Coatbridge
ML5 4JN 
Agent:
CD Architects Ltd
F.A.O. Grant Johnston
The Old School Business Centre
Studio 5
40 Rochsolloch Road
Airdrie
ML6 9BG 
Application Level:
Local Application 
Contrary to Development Plan:
No
Ward:   
11 Coatbridge South: 
Tracy Carragher, Geraldine Woods, Fergus
MacGregor, Andrew Bustard,
Representations:
9 letters of representation received.   
Recommendation: Approve Subject to Conditions 
Reasoned Justification: 
The proposal is considered to be an acceptable use within the General Urban Area that can be
accommodated without detriment to road safety and residential amenity. It is therefore
considered to be in accordance with the provisions of NPF4 and Policies PP 3, AD 3, EDQ 1
and EDQ 3 of the North Lanarkshire Local Development Plan 2022. 
Page 17 of 42

Page 18

Reproduced by permission of
the Ordnance Survey on
behalf of HMSO. © Crown
Copyright and database right
2009.  All rights reserved.
Ordnance Survey Licence
number 100023396.
Planning Application: 24/01205/FUL 
Name (of applicant): 
PP Builders & Son Ltd
Site Address: 
31A Rothesay Crescent
Shawhead
Coatbridge
ML5 4JP 
Development: Use of Premises as
Builder's Yard and Construction of
Storage Building (In Retrospect)   
Page 18 of 42

Page 19

Proposed Conditions: - 
1. That the development hereby permitted shall be carried out strictly in accordance with the approved details
submitted as part of the application and no change to those details shall be made without prior written
approval of the Planning Authority. 
Reason: To clarify the drawings on which this approval of permission is founded. 
2. That the premises will be used solely as a builder's yard operated by PP Builders and Sons and for no
other purpose. For the avoidance of doubt any future alternative use will require planning permission as
the current use is classed as being sui generis (of its own kind). 
Reason: To define the use of the land. 
3. That the premises will operate in accordance with the supporting information (including operational
hours/days of the week) as supplied by the applicant in the Supporting Statement Revision E received
22nd Jan 2026. 
Reason: To define the use of the land in the interest of residential amenity 
Background Papers: 
Consultation Responses: 
NLC Infrastructure and Transportation (Roads) received 12th December 2024 and 13th January 2025
NLC Protective Services (Environmental Health) received 10th January 2025 and 2nd December 2025
NLC Food Safety / Business Regulations received 23rd December 2024
NLC Estates received 13th March 2025 
Contact Information: 
Kirsten Devlin at esplanning@northlan.gov.uk or 01236 632487 
Report Date:   
22nd January 2026
Page 19 of 42

Page 20

APPLICATION NO. 24/01205/FUL 
REPORT 
1. Site Description 
1.1 The application site is approximately 520 square metres in area and is located at 31A Rothesay
Crescent, Shawhead, Coatbridge. It is bounded to the north by residential properties on Calder
Avenue, to south by an electrical substation and a road that provides vehicular access to the rear of
properties on both Rothesay Crescent and Howes Street. To the west are residential properties on
Howes Street and to the east is a public footpath leading from Calder Avenue to Rothesay Crescent,
a parking area that leads to a garage site for local residents and further residential properties. 
1.2 The application site consists of a single storey rectangular building located close to the northern
boundary, which was originally a Council depot. A further single storey pitched roof storage building
48 square metres in area was constructed from October to December 2024 at the southeastern corner
of the application site. Both the original building, the recently constructed storage building and the
portion of land between both buildings is owned by the applicant. The remainder of the application site
(a rectangular portion of land to the west of the more recently constructed unit) is owned by the Council.
This Council owned land houses a material waste skip, forms part of the yard, in curtilage parking and
the site access and has been demarcated by the erection of security fencing and access gates. The
applicant has applied to purchase this land from the Council. 
2. Proposed Development 
2.1 Retrospective planning permission is sought for the use of the premises as a builder's yard and
construction of a storage building.  A builder’s yard is considered to be a sui generis use (of its own
kind) which does not fit into the predefined use class categories; as such planning permission is
required for both the change of use and the construction of the more recent storage building. 
2.2 The unauthorised change of use and construction of the storage building were brought to the Planning
Authority’s attention through the Council’s unauthorised works complaints process in late September
2024. An enforcement case was opened (ref 24/00236/COMP) which led to the submission of this
retrospective planning application. 
2.3 The original building on site was a Council repairs depot that became surplus to requirements and was
subsequently sold. Planning permission to change the use to a facility for testing construction materials
was granted in April 2003. The last know use was by Coatbridge Laboratory Services Ltd. 
3. Applicant’s Supporting Information 
3.1 A supporting statement has been received outlining the operation of the business. The following has
been confirmed: 
• The original rectangular building at no.31A Rothesay Crescent (which accommodates office
space, staff welfare and material storage) is owned by the applicant. No members of the public
visit the premises and there is no trade counter. 
• Rothesay Crescent is the applicant’s sole business location, having moved from previous
premises at Souterhouse Road, Coatbridge. 
• The newer storage unit was constructed to create additional storage space for building materials. 
• No workshop machinery is located within the buildings, and no manufacturing takes place. 
• Material deliveries (consisting of Gyproc boards, bags of plaster, facings/architraves and skirtings)
and refuse collection occur once a month. 
Page 20 of 42

Page 21

• The external space houses a permanent refuse skip and can accommodate parking for 5 vehicles,
including 1 disabled space. 2 public spaces are located out with the site directly opposite the
entrance. 
• The business employs 12 staff, with 1 permanently based at the office. Some members of staff do
not present at the application premises, going straight to site. 
• Business hours are 8 am – 4.30 pm with 4 vans leaving the yard for 8 am and back in a 4.15 pm.
Loading of vehicles takes place at the end of each working day. Occasional Saturday morning
working is necessary between 8 am to 1.30 pm and no work takes place on a Sunday.  The office
member of staff works 9 am – 3pm therefore there is no cross over of parking from the office staff
and the 4 business vans. 
4. Site History 
4.1 The following site history is of relevance: 
• No.31A Rothesay Crescent was originally a Council owned repairs deport that operated for a
number of years before closing in approximately 2002. 
• 03/00206/FUL: Change of Use of Repairs Depot to Facility for Testing Construction Materials –
Approved 14.04.2003 
• Last know use at the site was by Coatbridge Laboratory Services Ltd. 
• 24/00236/COMP: Unauthorised Builder's Yard and Construction of Building – Under consideration
pending outcome of current retrospective planning application 
4.2 During the early stages of the application process correspondence was received from Councillor
Carragher, Leader of the SNP Group on behalf of a local constituent querying the neighbour
notification and press advertisement procedures and raising concerns with the use and in particular
on-street and pavement parking on Calder Avenue. It was confirmed that the necessary neighbour
notifications had been carried out and an advert placed in the Airdrie and Coatbridge Advertiser. 
4.3 In March 2025 Fulton MacGregor MSP contacted the Planning Service on behalf of the same
constituent querying the length of time the planning application was taking, why the unauthorised use
has been allowed to continue and intended steps to address noise, damage to road verges and
authorised parking. It was explained the delay in determining the application was due to the need for
a site investigation and ground gas monitoring results to be submitted and reviewed. It was also
confirmed that issuing a stop notice and enforcement notice was only appropriate in urgent or serious
cases. 2 noise complaints were investigated by NLC Environmental Health with no action required and
the cases closed. The issues of damage to road verges and unauthorised parking were more difficult
to comment on due to historical damage to verges and Rothesay Crescent being characterised by on-
street parking. The issue of parking on Calder Avenue was of a temporary nature which ceased when
the storage building being constructed on site was completed. 
Page 21 of 42

Page 22

5. Development Plan 
5.1 The development plan consists of National Planning Framework 4 (NPF4) and the North Lanarkshire
Local Development Plan (NLLDP) 2022.
5.2 Given the nature and scale of this development the most relevant considerations are already enshrined
in the North Lanarkshire Local Development Plan policies.  Policy 26 – Business and Industry of NPF4
is most relevant to the consideration of this application. 
5.3 In terms of the North Lanarkshire Local Development Plan 2022 the following policies are of relevance: 
PP 3 Purpose of Place   
AD 3 Amount of Development
EDQ 1 Site Appraisal
EDQ 2 Specific Features for Consideration
EDQ 3 Quality of Development  
6. Consultations 
6.1 The following consultation responses have been received in connection with the application:
NLC Infrastructure & Transportation (Roads) recommended the application be deferred subject to
in-curtilage parking details being provided. On receipt of the details, they recommended that the
application be refused as the required 7 in curtilage parking spaces (based on the floor area of the
buildings) cannot be provided and that the siting of a storage skip affected the in-curtilage parking
provision. 
NLC Protective Services (Environmental Health) initially requested further information on the
activities at the site before determining whether a Noise Impact Assessment, in accordance with the
BS4132 methodology, was required. They confirmed as the site is in proximity to potentially
contaminated land due to historical land uses, including a former mineral railway, quarrying and
unknown filled ground, a site investigation required to be carried out in accordance with BS
10175:2001 “The Investigation of Potentially Contaminated Sites” and any remediation work be
completed and verified. Standard comments relating to external artificial lighting were also received. 
On receipt of information on the operations at the site it was confirmed a Noise Impact Assessment
was not required. The need for a site investigation, and remediation measures (if required) are normally
covered by the imposition of planning conditions. However, as this is a retrospective application the
site investigation (and remediation details if required) must be submitted and assessed before the
retrospective planning application can be determined. The requirement for this has led to a
considerable delay in determining the application. A Coal Mining Risk Assessment, Phase 1 Desk
Study and Phase 2 Site Investigation have been received and NLC Environmental Health have
confirmed they are satisfied the environmental risks are low and no remediation measures are
required. 
NLC Protective Services (Food Safety / Business Regulations) comment that the premises require
to comply with the requirements of the Health and Safety at Work etc Act 1974, with particular
consideration to traffic routes, traffic management, separation of vehicles and pedestrians. 
NLC Estates have no comment to make. 
Page 22 of 42

Page 23

7. Representations 
7.1 9 letters of representations (from 6 households) have been received in connection with the application.
The points raised and comments thereon are as follows: 
Point of Objection: The use is inappropriate for a residential area, with policies in place to protect the
character of such areas. It should be situated in an industrial setting. 
Comment: It is agreed that such a use would more commonly be found within an industrial or business
setting. However, the residential policies contained with Local Development Plan seek to maintain and
improve the level of amenity appropriate for the local context and encourage diversity in more mixed-
use areas.  This is a residential area that surrounds a site that has historically been used for various
business purposes and was originally a Council depot. 
Point of Objection: Approving the application could set a precedent for future inappropriate
development in North Lanarkshire. 
Comment: The above is noted however each planning application is decided on its own merits. 
Point of Objection: Inconsiderate parking of employee’s vehicles close to driveways and on the
pavements at Calder Avenue is causing a danger to public safety. Police Scotland have been involved. 
Comment: The applicant confirmed work’s vehicles were initially parked on Calder Avenue when the
storage building was being built and that this practice has ceased. Visits to the site by the planning
officer over the course of the application have not witnessed issues with on-street parking on Calder
Avenue. 
Point of Objection: Noise from heavy machinery, vehicles and any construction or preparation
activities is inappropriate in a residential setting and detracts from resident’s quality of life. 
Comment: The business does not manufacture any goods, and no machinery is located on site. NLC
Protective Services (Environmental Health) have visited the site and were satisfied the use did not
require the submission of a Noise Impact Assessment. The historic business usage combined with the
level of traffic associated with the business are not considered to significantly detract from residential
amenity. 
Point of Objection: The builder’s yard is within a densely populated residential area with works
vehicles having to drive through the entire estate to gain access. The roads are not suitable for
constant use by large vehicles which pose a safety risk to pedestrians. 
Comment: The level of activity associated with the use is not considered to be significant enough to
pose a risk to public safety or significantly impact residential amenity. NLC Infrastructure &
Transportation did not raise any road safety issues 
Point of Objection: The industrial nature of the yard is visually out of place in a residential area. The
unit was previously used as a storage facility for Coatbridge Medical Services, where there was little
activity. 
Comment: The original building and yard area (excluding the section currently owned by the Council)
has been used by a medical supplies business, a facility for testing construction materials and was
initially a Council owned repairs depot. In visual amenity terms the use as a builder’s yard is not
considered to be significantly different or detrimental to the residential setting. 
Point of Objection. The application site shares a boundary with several residential properties with
materials being stored against the shared garden fences and walls. There are concerns about the
impact on their stability, health and safety and associated costs in the event they require repair. 
Comment: The above are not material planning considerations; they would be private/civil matters
between the relevant parties.   
Page 23 of 42

Page 24

Point of Objection: The recently constructed storage building is higher than the single storey building
on the site and the submitted plans do not show its height or dimensions. It is out of keeping with the
existing building on site. 
Comment: It is accepted that the newer storage building is higher than the original building which has
a lower wall head and shallower roof pitch. It is 5.25m in height and given the scale of neighbouring
residential properties it is not considered to be out of keeping with the surrounding locale. 
Point of Objection: Loss of privacy and noise from building works which affected outdoor use of a
neighbouring garden in Summer 2024. 
Comment: The above was disturbance of a temporary nature due to the construction process. 
Point of Objection: The retrospective nature of the application suggests a disregard for due process
and community input, it being particularly disappointing for the Council to allow this. It is implausible
for a builder to state they were unaware that planning permission was required. 
Comment: The above points are noted. The retrospective application requires to be assessed on the
planning merits and cannot be refused on the grounds the applicant was allegedly aware planning
permission was required. 
Point of Objection: NLC Property Services were made aware of works on the Council owned land by
a member of the public in July 2024 but allowed the development to proceed. It is also disappointing
that NLC Planning and Building Standards chose not to intervene. 
Comment: The Planning Service cannot comment on the practices of other Council services. Planning
Service involvement began late September 2024 when a formal complaint was received about the
unauthorised works and led to the submission of this retrospective application. 
Point of Objection: Planning and Building regulations have been breached by fencing off land
designated for access as per Land Registry for Scotland ref: LAN167732. Furthermore, a neighbour
claims they have a right of access to the rear of their garden; there was a driveway there until a few
years ago when the gates were removed and a fence erected. 
Comment: The above are legal matters that are not material to the consideration of this retrospective
planning application. 
Point of Objection: The business is using a common access road as an extension to their yard area,
for parking of vehicles and loading and unloading to the detriment of access for residents on Howes
Street and Rothesay Crescent. 
Comment: The above is again a legal matter, and the applicant will need to ensure that legal rights of
access are maintained free of obstruction. The site has been visited on numerous occasions by the
case officer, and this has not been witnessed. 
Point of Objection: The proposal violates the feu disposition terms of no.31A Rothesay Crescent
which states the property must not be used in any way that harms the amenity of the neighbourhood
or causes nuisance to nearby owners, tenants or others. While rights of the original superiors have
been abolished, neighbouring proprietors retain the ability to enforce such burdens under the Title
Conditions (Scotland) Act 2003. Granting consent would set a concerning precedent for the disregard
of these legal protections. 
Comment: Again, this a legal matter that is not material to the consideration of this retrospective
planning application. 
Page 24 of 42

Page 25

8. Planning Assessment 
8.1 Under Section 25 of the Town and Country Planning (Scotland) Act 1997, planning decisions must be
made in accordance with the development plan unless material considerations indicate otherwise.  
8.2 In terms of National Planning Framework 4 (NPF4) Policy 26 – Business and Industry is the most
relevant. This policy aims to encourage, promote and facilitate business and industry uses. It states
business and industry uses on sites allocated in the Local Development Plan (LDP) will be supported.
If further states such uses out with identified areas in the LDP will only be supported where there are
no alternative sites and the nature and scale of the activity will be compatible with the surrounding
area, including impact on residential amenity. It is accepted that alternative sites are likely available
within existing industrial areas. However, the original building on site and the associated land
(excluding the portion under Council ownership) was once a Council repairs depot that was
subsequently used by a firm for the testing of construction materials and laterally a medical supplies
company. Historical use of the original premises for business purposes therefore exists and is an
important consideration. Based on the submitted details, the nature and scale of the business activity
and impact on residential amenity are not considered to be significantly detrimental. To ensure this
remains a business use that is appropriate to the location we are proposing that a personal permission
(to the applicant’s company) is given and this will ensure that any other user of the premises would
need to seek our approval before operating from the site. 
8.3 Within the NLLDP the site is located within the General Urban Area covered by Policy PP3 Purpose
of Place which seeks to maintain and improve the level of amenity appropriate for the local context
and encourage diversity in more mixed-use areas.  This policy also requires such proposals to be
assessed against the criteria of AD 3 (Amount of Development), EDQ 1 (Site Appraisal), EDQ 2
(Specific Features for Consideration) and EDQ 3 (Quality of Development) which consider issues such
as size, materials, road safety, contaminated land, ground instability (coal mining) and which states
that proposals must integrate successfully with the surrounding area by avoiding harm to the
neighbouring amenity.  
8.4 Policy PP3 Purpose of Place seeks to maintain and improve the level of amenity appropriate for the
local context and encourage diversity in more mixed-use areas.  This is a residential area that
surrounds a site that has historically been used for different business purposes. The determining factor
in assessing this proposal is whether a builder’s yard will significantly impact on surrounding residential
amenity. In this regard, the builders’ yard is used for material storage in connection with a repair and
maintenance business. No members of the public visit the premises and there is no trade counter.
There is no machinery, and no manufacturing of material takes place on site. The main activity takes
place on site in the morning when the vans leave to go to site and early evening when the vans return
and are loaded for the next day. Material deliveries and refuse collection occur monthly. The site can
accommodate the parking of 5 vehicles, which while less than the 7 required by NLC Infrastructure
and Transportation (Roads) is considered an appropriate level for the current business.
8.5 Policy AD3 Amount of Development requires applications for new development be assessed for their
implications related to the amount of development proposed. The need for an assessment depends
on the combination of type (use class), scale and location of development.  The proposed use is sui
generis (of its own kind) and as such does not fall under any of the Use Classes outlined in the Town
and Country Planning (Use Classes) (Scotland) order 1997 and as such does not require to be
assessed. However, based on the business activity, level of usage and historical business use the
proposal is considered appropriate for the local context and as indicated above a personal permission
(to the applicant’s company) is being recommended. 
Page 25 of 42

Page 26

8.6 Policy EDQ 1 (Site Appraisal) requires all development to be appraised in terms of the site and its
surroundings to ensure it will integrate successfully into the local area and avoid harm to neighbouring
amenity. A number of matters required to be assessed; those most relevant to this proposal are:
• massing, height, style, finishing materials of any buildings on the site and surrounding Land Use
Character Area
• orientation and topography of the site and surrounding Land Use Character Area 
• building lines, plot ratios, groupings, types of enclosure (e.g. fences, walls, hedges), landmarks in
the Land Use Character Area 
• existence and quality of connections and access including site and building entrances, roads,
paths and visuals on the site and surrounding Land Use Character Area 
The recently constructed storage building is of a size, scale and material palette that is consistent with
the surrounding residential area and the security fencing and gates match in height and design the
existing boundary treatment at the site. The site levels have not been altered, and the extended site
boundary does not impinge on the vehicular access road that serves the rear of the properties on
Rothesay Crescent and Howes Street. 
8.7 Policy EDQ 2 (Specific Features for Consideration) requires the Council to consider development in
areas subject to hazards. As the site is in proximity to potentially contaminated land due to historical
land uses, including a former mineral railway, quarrying and unknown filled ground, a site investigation
required to be carried out in accordance with BS 10175:2001 “The Investigation of Potentially
Contaminated Sites” and any remediation work be completed and verified. The need for a site
investigation, and remediation measures are normally covered by the imposition of planning
conditions. However, as this is a retrospective application the site investigation required to be
submitted and assessed before the application can be determined. A Coal Mining Risk Assessment,
Phase 1 Desk Study and Phase 2 Site Investigation have been received and NLC Protective Services
(Environmental Health) have confirmed they are satisfied the environmental risks are low and no
remediation measures are required. 
8.8 Policy EDQ 3 (Quality of Development) applies to all development and requires high quality
development in terms of several factors, the most relevant for this application are siting, scale,
massing, materials and appropriate parking. The buildings on site including the more recently erected
storage building are of size, scale, design and material palette that are considered acceptable for the
site and the surrounding locale. The level of in-curtilage parking provision, while accepting it does not
meet the requirements of Infrastructure and Transportation (Roads), which are based on the floor area
of the buildings on site, is considered appropriate for the use and level of activity associated with it.  
9. Conclusions 
9.1 Taking account of the above, including the representations received, the proposal is considered
appropriate for the local context and is considered to comply with Policies PP 3, AD 3, EDQ 1, EDQ 2
and EDQ 3 of the North Lanarkshire Local Development Plan 2022. It is therefore recommended that
retrospective planning permission be granted subject to conditions one of which will make this
permission personal to the applicant’s company. 
Page 26 of 42

Page 27

North Lanarkshire Council
Report
Planning Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref GM Date 05/02/26 
Planning and Place Performance Report 2024-25 
From  Pamela Humphries, Chief Officer (Place)  
E-mail McCrackenGwen@northlan.gov.uk Telephone  01236 632487 
1. Background 
1.1 The Committee will recall that, in previous years, it routinely received the annual
Planning Performance Framework (PPF) reports, through which the service reported
performance on a voluntary basis under an agreement between the Scottish
Government and Heads of Planning Scotland (HOPS). As reported to Committee last
year, this voluntary framework has now been replaced by the statutory national
performance monitoring arrangements introduced by the Planning (Scotland) Act 2019.
To support the new approach, and to provide planning authorities with advice on
Executive Summary 
The Planning (Scotland) Act 2019 introduced statutory reporting of the performance of
Planning Authorities. This report seeks to inform the Committee of the feedback from the
National Planning Improvement Coordinator on the outcome of the Annual Report, required
as part of the new National Planning Improvement Process, and to update on the
performance of the service against the key performance indicators for 2024-25. The report
also sets out the improvement actions that the service has identified to focus on in the
coming period. 
The timing of this report has been impacted by the delayed publication of the relevant
performance data by the Scottish Government necessary to complete the assessment for
2024-25. 
Recommendations
It is recommended that the Committee consider the content of this report and endorse the
actions being taken to improve performance and service delivery. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement All ambition statements
Programme of Work Transforming Places
Item 3
Page 27 of 42

Page 28

improving the performance of their functions, the role of National Planning Improvement
Co-ordinator (NPIC) has been established within the Improvement Service 
1.2 The Planning Improvement Co-ordinator was appointed in September 2023 and since
then has collaborated with HOPS, planning authorities and other stakeholders to
develop an appropriate mechanism for driving improvement across the planning
system. The initial priority has been the creation of a new performance and
improvement model that builds on the lessons learned from the previous Planning
Performance Frameworks. As a result, a new National Planning Improvement
Framework (NPIF) has been introduced. 
1.3 The key principles of NPIF are: 
• A renewed focus on improvement: NPIF aims to draw on planning authorities’ self-
assessment to identify areas for development which will inform an improvement action
plan. 
• Peer Collaborative Review: The previous Scottish Government marking system will
be replaced by peer review involving NPIC, other planning authorities and relevant
stakeholders. 
• Measuring quality: NPIF seeks to incorporate indicators that better assess impacts,
outcomes achieved and the overall quality of service delivery. 
• A high performing planning authority: NPIF emphasises assessment against the
characteristics of a high performing service under the headings: tools and resources;
engagement; people; culture; and place. 
• Recognising dependencies: NPIF acknowledges that planning authorities rely on the
input and cooperation of other parties in delivering their functions. 
• Resources: NPIF has been designed to be proportionate and to avoid adding
unnecessary pressure on planning authorities’ resources. 
1.4 As this is a new process for planning authorities, the first year of the National Planning
Improvement Framework (NPIF) was delivered as a pilot, undertaken in three cohorts
across 2024/25. North Lanarkshire Council participated in this pilot and, as part of the
process, was partnered with Fife Council to share learning and act as critical friends.
That partnership arrangement continued into Year 2. 
1.5 The Year 2 guidance (2025/26) confirms that planning authorities are no longer
required to complete a full self-assessment annually. Instead, Year 2 focuses on
providing a progress update against the improvement actions agreed in Year 1. As
such, each authority is required to update progress on improvement actions and meet
with the National Planning Improvement (NPI) team to discuss progress and next steps. 
1.6 North Lanarkshire Council has now completed the Year 2 update and has met with the
NPI team, who act as a “critical friend” to review progress. The NPI team have used
the updated information to prepare a standardised national report template for each
authority. The North Lanarkshire Council report has now been endorsed by the National
Planning Improvement Champion and will be published online as part of the annual
statutory performance reporting requirements under the Planning (Scotland) Act 2019. 
Page 28 of 42

Page 29

1.7 In addition to this, the Scottish Government continues to publish Planning Application
Statistics and the figures for the performance of the service are detailed in section two
below. 
2. Report 
2.1 The Planning Service is part of the Place Service and is established to: 
• Deliver a wide range of statutory planning functions including the Local
Development Plan, assessing applications for new development, and facilitating
place change. 
• Enable economic growth, further community wealth building, and protect and
enhance North Lanarkshire’s built and natural environment. 
• Deliver some non-statutory planning functions, including planning enforcement. 
2.2  The service has a key role in supporting delivery of The Plan for North Lanarkshire by
facilitating new development to grow the council’s economic base. 
Performance KPIs 
2.3 Every year the Scottish Government publishes statistics for the 34 Planning authorities,
and these were produced in December 2025 for the 2024/25 reporting period. Table 1
shows our performance in the key outcomes for Development Planning. 
Table 1: National Headline Indicators - Development Planning    
Development Planning  2023-24 2024-25
Local and Strategic Development
Planning: 
Age of local development plan(s) at end of
reporting period 
Requirement: less than 5 years 
1 year 9
months
2 years 9
months
Will the local development plan(s) be
replaced by their 5th anniversary according to
the current development plan scheme?  
Y Y
Has the expected date of submission of the
plan to Scottish Ministers in the development
plan scheme changed over the past year?  
N N
Were development plan scheme
engagement/consultation commitments met
during the year?  
Y Y
Page 29 of 42

Page 30

Effective Land Supply and Delivery of
Outputs1 
Housing approvals  884 units 305 units
Housing completions over the last 5 years  5,775 units   5,066 units
Land available for Industry and Business   441.10 ha 436.76 ha
Take-up of Land for Industry & Business on
allocated sites
5.13 ha 6.91 ha   
2.4  Table 2 shows the Development Management performance of North Lanarkshire in
comparison to the Scottish average. Where no figure is given, the Scottish Government
has not published a national figure. 
Table 2: National Headline Indicators Key outcomes – Development Management 
Development Management:  2023-24 2024-25 2024-25
Scottish
Average
Project Planning    
Percentage and number of applications subject to pre-
application advice 
7.9% (77) 4.7% (54) 
Percentage and number of major applications subject to
processing agreement 
88.9% (9) 80% (15) 
Decision Making    
Application approval rate  96.6% 96.% 92.2%
Delegation rate  97.1% 95.8% 96.6%
Validation  42.1% 43.8% 
Decision-making Timescales    
Major Developments  9.8 weeks 12.9 weeks 37.4 weeks
Local developments  7.1 weeks 7.1 weeks 11.8 weeks
Householder developments  5.8 weeks 5.5 weeks 8.3 weeks
Legacy Cases    
Number cleared during reporting period  32 18 
Number remaining   75 71 
Page 30 of 42

Page 31

2.5 Table 3 shows the performance of the Planning Service when it comes to appeals.
Where appeals are to the Scottish Ministers the percentage of cases where the
Reporter upheld the decision of the Planning Committee is higher than the Scottish
average, however, the percentage of delegated decisions upheld by the Local Review
Body decreased in 2024-25 and was lower than the national average. 
Table 3: Decision-making: local reviews and appeals 
Original decision upheld    
2024/25
National
Statistics    
2023-24   2024-25
Total no. 
2024-25 
Type  No.  % original
decision
upheld
No.  % original
decision
upheld 
No. % original
decision
upheld
Local reviews  5 40.0% 1 16.7% 6 60%
Appeals to Scottish
Ministers 
7 85.7% 3 75% 4 63.8% 
Service priorities for 2025/26 
2.6 The service will continue to work to implement improvements across all performance
indicators, as stated in paragraph 1.3 above, and to continue to work towards
implementing our improvement action plan as endorsed by the NPIC. 
2.7 In assessment, overall, the performance of the service is considered to be good. During
2024-25, the NPIF Action Plan delivered significant progress, supported by a staff
restructure, the creation of the Invest team, and continued investment in digital
innovation. Key achievements included improved workforce capacity through new
graduate recruits (three posts) and an enforcement officer, enhanced digital tools such
as Power BI dashboards, and strengthened cross service collaboration through the new
multidisciplinary Invest NL team. 
2.8 Engagement activity, including the “Tell Us About Your Place” survey, provided
valuable insights for the next Local Development Plan. Staff workshops also continued
to embed a culture of collaboration and continuous improvement. 
2.9 A number of challenges required adaptation, including limited uptake for the Agents
Forum, the deferral of a planning officer working group (this has been amalgamated
into the staff workshops), and delays in completing PRD reviews following the
restructure. Work is also ongoing to explore alternative digital solutions where proposed
tools were not viable for monitoring planning conditions, and to progress legacy case
reviews. 
Page 31 of 42

Page 32

2.8 We have therefore identified the following actions as our key priorities in the coming
year: 
• Set deadline for completion of PRD process in reporting period to allow any
training needs to be assessed and delivered if required.
• Implement Elected Members training in accordance with new legislation.
• Monitor and evaluate Invest NL team multi-disciplinary workflow processes,
performance and track statutory consents linked to Invest pre-applications to
assess their impact on project delivery timescales.
• Create a collaborative Local Development Plan (LDP) hub to enhance
engagement and coordination between services and stakeholders throughout
the LDP lifecycle.
• Undertake a Planning Processing Agreement (PPA) process review,
specifically around the extension to PPA where dates are not fulfilled.
• Undertake a process review around stalled sites and legacy cases to establish
a methodology to progress cases. 
3. Measures of success 
3.1  The measures of success are not only in relation to the performance indicators that are
set out in the tables in this report but are also more qualitative in terms of ensuring that
the Planning service, through its engagement with applicants and other stakeholders,
contributes to the delivery of good quality development in the right locations that
facilitate delivery of The Plan for North Lanarkshire and the council’s Local
Development Plan. 
4. Supporting documentation 
Improvement Action Progress Update 2025 
Scottish Government Planning Application Statistics 2024-25 
Pamela Humphries
Chief Officer (Place) 
Page 32 of 42

Page 33

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 33 of 42

Page 34

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 34 of 42

Page 35

North Lanarkshire Council
Report
PLANNING COMMITTEE 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    Index 1 Date 05/02/25 
NOTICE OF PLANNING AND ENFORCEMENT APPEALS LODGED 
From  Pamela Humphries, Chief Officer (Place)  
E-mail humphriesp@northlan.gov.uk Telephone 01236 632487 
1. Background 
1.1 Where a planning application has been refused by the Planning Committee, or Full
Council, the applicant may appeal the decision to the Scottish Government within 3
months.   
1.2 Applicants may also appeal against a planning condition which has been imposed
within a planning consent. 
Executive Summary 
The purpose of this report is to advice Committee of planning appeals that have been
recently lodged with the Scottish Ministers. 
Recommendations
It is recommended that the Committee notes the position regarding appeals lodged with
Scottish Ministers. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Item 4
Page 35 of 42

Page 36

2. Report 
2.1 The council has received notification that the following appeals have been submitted
to the Scottish Ministers. 
Application No.      Applicant        Date of Council    Form of  Note
& Proposal          & Site                 Decision               Appeal 
24/01263/S42  Knight Property  16/10/2025 Written
S42 Application for Land at    Submission
Non-Compliance  Belgowan Street
with Planning  Bellshill Industrial Estate
Conditions 1, 5 & 6 Bellshill
of Planning Permission 
24/00598/FUL (Change
to the Approved 
Drawings; Delete Condition
that Restricts 24 Hour 
Working and Revised Noise
Mitigation Measures)   
3. Measures of success 
3.1 The outcome of appeals will be reported to Committee in due course. 
4. Supporting documentation 
4.1 Details of appeals submitted to the Scottish Ministers can be found on the DPEA
website: 
Scottish Government - Planning and Environmental Appeals Division (DPEA) 
Pamela Humphries
Chief Officer (Place) 
Page 36 of 42

Page 37

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 37 of 42

Page 38

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 38 of 42

Page 39

North Lanarkshire Council
Report
PLANNING COMMITTEE 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    Index 2 Date 05/02/26 
NOTICE OF PLANNING AND ENFORCEMENT APPEALS
DECISIONS 
From  Pamela Humphries, Chief Officer (Place)  
E-mail humphries@northlan.gov.uk Telephone 01236 632487 
1. Background 
1.1 Where a planning application has been refused by the Planning Committee, or Full
Council, an applicant may appeal the decision to the Scottish Government within 3
months.  
1.2 Applicants may also appeal against a planning condition which has been imposed
within a planning consent. 
1.3 The Planning Committee is notified of appeals that have been lodged with the Scottish
Government, and also the outcome of these appeals once a decision has been made.   
2. Report 
2.1   The council has received notification that the following appeal has been decided by
the Scottish Ministers. 
Executive Summary 
The purpose of this report is to advise Committee of a planning appeal that has been
recently decided by the Scottish Ministers. 
Recommendations 
It is recommended that the Committee note the decision in respect of this appeal. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Item 5
Page 39 of 42

Page 40

Application No. &
Proposal 
Applicant & Site  Appeal
Decision &
Date 
Note 
25/00815/LUC  Mr James Gilhaney      Appeal
Change of Use Building to the Reaf      Dismissed 
from Day Room of Mill Cottage                  08/01/2026
(Sui Generis) to Old Mill Road
Dwelling  Allanton   
ML7 5BX 
3. Measures of success 
3.1   The Planning Committee is kept informed of the outcome of appeals made to the
Scottish Government.       
4. Supporting documentation 
4.1 Details of appeals decided by the Scottish Ministers can be found on the DPEA website: 
Scottish Government - Planning and Environmental Appeals Division (DPEA) 
Pamela Humphries
Chief Officer (Place) 
Page 40 of 42

Page 41

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 41 of 42

Page 42

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 42 of 42