Argyll and Bute Council  
Development and Economic Growth    
  
This report is a recommended response to the Scottish Government’s Energy Consents
and Deployment Unit (ECDU) consultation on the Section 36C Variation Application to
the Section 36 consent granted on 29th October 2021 to construct and operate
Blarghour Wind Farm, on land approximately 7km north west of Inveraray and 4.5km
south of Portsonachan.
_________________________________________________________________________ 
  
Reference No: 23/00537/S36/ECU00004754 
Applicant:      The Scottish Government on behalf of Blarghour Wind Farm Limited 
Proposal:  Electricity Act Section 36C and Electricity Generating Stations   
(Applications for Variation of Consent)(Scotland) Regulations     
consultation from the Energy Consents Unit for Proposed Variation to   
Blarghour wind farm (consented 29th October 2021). The S36C 
variation proposes to vary the S36 consent from 17 wind     
turbines, 136.5m in height to blade tip to 14 wind turbines, 180m in   
height to blade tip.  
Site Address:  Land approximately 7km north west of Inveraray and 4.5km south of   
Portsonachan.
________________________________________________________________________   
SUPPLEMENTARY REPORT NO. 1  
1. UPDATE   
1.1 Since completion of the Report of Handling, correspondence (dated 15th December 
2023) has been received from the Applicant following their review of the Report of 
Handling.  There are several aspects which the Applicant wishes to highlight in relation 
to ornithology, which they consider do not adequately reflect NatureScots advice, as 
updated following recent discussions with them. 
1.2 Although they welcome the recommendation that the Council does not object to the 
Proposed Varied Development they consider that it is important that Members are 
given a fuller summary of the NatureScot position. The Report of Handling advises 
Members that: 
‘NatureScot advise there is a high risk the G/LAE1B golden eagle territory could be 
abandoned; - NatureScot request clarification regarding the flight data used in the CRM 
calculations; and - NatureScot recommend post-construction monitoring.’ 
1.3 The Applicant would like to advise that following discussions with  NatureScot 
between the 5th September and the 31st October 2023, the position has moved on and 
they have provided supporting documentation confirming this.

Page 2

1.4 The Applicant’s response to NatureScot’s letter dated 18th July 2023 forms part of this 
correspondence, along with accompanying Appendix 1 which contains a technical 
response to the points raised in relation to ornithology and Appendix 2, providing 
clarification in respect of flight data used in collision risk modelling calculations. 
Thereafter, NatureScot’s response dated 12th October confirms that these 
aspects have been addressed to the satisfaction of NatureScot.  Relating these to the 
above points in the Report of Handling please note that: - NatureScot ‘accept the 
wording error in relation to their 18 July 2023 response letter being read as Blarghour 
wind farm itself rather than the growing cumulative impacts on this eagle territory which 
risk abandonment of the G/LAE1B territory’. 
1.5 NatureScot therefore accept that this is a wider point, not due to the Blarghour Wind 
Farm Application. - It is confirmed that ‘the [Applicant’s] revised Collision Risk 
Assessment provides suitable clarification regarding the Red-Throated Diver and 
Golden Eagle issues raised in our response’. NatureScot go on to confirm that 
Blarghour Wind Farm can be accommodated. - Additionally, NatureScot have 
welcomed the Applicant’s comments regarding monitoring should birds reuse the site. 
1.6 It should be noted from point 2.3 within Appendix 1 to the Applicant’s response to 
NatureScot: ‘should breeding divers return (evidenced by the monitoring survey work 
to be undertaken as part of the approved Land Management Plan), the Applicant 
confirms that post-construction monitoring should take place. Lochan checks will be 
undertaken as part of pre-construction monitoring and should any divers return to 
breed, the Applicant will respond accordingly in line with the Breeding Birds Protection 
Plan to be implemented as approved.’ 
2. CONCLUSION & RECOMMENDATION 
2.1 This information provides a useful update to the ornithology position, which was not 
available at the time of writing the Report of Handling.   
2.2 In light of the above and the fact that NatureScot have advised that Blarghour wind 
farm can be accommodated it can now be concluded that in terms of ornithology the 
proposal is consistent with the provisions of Policies 11 – Energy and 3 – 
Biodiversity of NPF4, and Policies LDP STRAT 1 – Sustainable Development; 
LDP DM1 – Development within the Development Management Zone; LDP 3 – 
Supporting the Protection, Conservation and Enhancement of our Environment; 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables; SG LDP ENV 
1 – Development Impact on Habitats, Species and Our Biodiversity (i.e.  biological 
diversity) and Supplementary Guidance 2 of the Argyll & Bute Local 
Development Plan. 
2.3 Consequently, it is recommended that the recommendation is amended to reflect this 
as follows: 
That the ECU be notified accordingly that: 
• That Argyll & Bute Council DOES NOT OBJECT to this application, subject
to the inclusion of the conditions recommended by consultees in any
consent granted by the ECU. These should also include the condition
proposed by the Applicant to allow the lighting scheme to be revisited in the
future to take account of emerging technological solutions which would
reduce the impacts of visible lighting, such as transponder radar activated
lighting.

Page 3

Author of Report: Arlene Knox     Date: 19th December 2023
Reviewing Officer: Sandra Davies     Date: 19th December 2023
 
  
Fergus Murray   
Head of Development and Economic Growth