Democracy Spraffa

__Planning Adviser Background Report

North Lanarkshire Council · 9 August 2022
Back to Local Review Body — 9 August 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.

Page 1

North Lanarkshire Council
Report
Local Review Body 
Does this report require to be approved? ☒ Yes   ☐ No
Ref 22/00007/FUL Date 09/08/22 
Planning Application 22/00007/FUL: Planning Adviser
Background Report 
From  Pamela Humphries, Head of Planning and Regeneration  
E-mail MclennaghanE@northlan.gov.uk Telephone Edward McLennaghan,
07583677745 
Executive Summary
This background report summarises the key considerations for review by the members of
the Local Review Body in determining the appellants appeal against the delegated refusal
of their application. 
Recommendations
That the members of the Local Review Body note the content of this background report.  
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (14) Ensure the highest standards of public protection

Page 2

1. Background 
1.1 Planning Application 22/00007/FUL for Three Detached Dwellinghouses at Land East
of 111 Main Street, Longriggend, Airdrie was refused planning permission under
delegated powers on the 7th March 2022. 
1.2 A notice of review was submitted by the appellant dated 16th March 2022. 
2. Description of Proposal and Location 
2.1 Description of proposal:  Three Detached Dwellinghouses
Location: Land East of 111 Main Street, Longriggend, Airdrie 
2.2 The application site is located directly east of 111 Main Street, Longriggend with the
boundary of 111 Main Street being the current the eastern boundary for Longriggend.
The site is located on land designated partly as established housing areas and
countryside (rural investment area) with houses immediately to the south and west of
the site. Further vacant greenfield land lies beyond the site to the east and north. 
2.3 Site Context 
Google Aerial View 1

Page 3

Google Aerial View 2 
2.4 Plans   
Location Plan

Page 4

Plot 1 Plans, Elevations and 3D View 
Plot 2 Plans and Elevations

Page 5

Plot 2 3D Views 
Plot 3 Plans and Elevations

Page 6

3D Site Views 
Site Views and Perspectives

Page 7

2.5 Site Photographs 
Application Site – Viewed from South-West 
Application Site – Viewed from South-East

Page 8

Application Site Viewed from North-East 
Application Site Viewed from North-East

Page 9

Application Site Viewed from the East 
Application Site Viewed from the North

Page 10

Application Site – Site Panorama Looking South 
2.6 Planning Policy 
North Lanarkshire Local Development Plan Extract

Page 11

2.7 The Scottish Government confirmed on 5 July 2022 that the Scottish Ministers do not
propose to issue a direction in respect of the adoption the North Lanarkshire Local
Development Plan and that the Council can proceed to Adopt.  Accordingly, the Plan
has now been Adopted by the Council and became operative on 6 July 2022.  Whilst it
remains possible that there may be a legal challenge to adoption from objectors to the
Plan, it is unlikely that any such challenge would relate to matters directly relevant to
this application. 
2.8 The application raises no strategic issues in terms of the Clydeplan Strategic
Development Plan 2017, and, therefore, can be assessed in terms of the North
Lanarkshire Local Development Plan 2022. 
2.9 The relevant Policies in the North Lanarkshire Local Development Plan and associated
Guidance are detailed and can be summarised as follows: 
General Urban Area PP 3 Policy Purpose of Place
General Urban Area AD 3 Policy Amount of Development
Countryside PP 5 Policy Purpose of Place
Countryside AD 5 Policy Amount of Development
Environmental and Design Qualities EDQ 3 Policy Quality of Development
SPG 08 (Assessing Development in the Rural Investment Area) 
A copy of these policies in full are located in section 4 Supporting Documentation of
this report. 
2.10 The Report of Handling considered that the development was contrary to policy NBE
3B (Rural Investment Area) and associated Supplementary Planning Guidance Note
SPG 08 as it constituted inappropriate development in the Rural Investment Area that
does not fulfil the requirements of enhancing an existing development cluster and
provides no adequate justification, special circumstances or material considerations to
merit a departure from this policy in this instance. 
2.11 Reasons for Refusal 
1. The proposal is contrary to policy NBE 3B (Rural Investment Area) and associated
Supplementary Planning Guidance Note SPG 08 of the North Lanarkshire Local
Plan as it constitutes inappropriate development in the Rural Investment Area in
that it does not fulfil the requirements of enhancing an existing development cluster.
No adequate justification, special circumstances or material considerations have
been demonstrated to merit a departure from this policy. 
2.12 The report of handling recommended that the proposal should be refused for the
reasons outlined in both the Reasoned Justification and in the Reasons for Refusal
contained within the agenda papers annex. 
2.13 The application was refused planning permission on 7th March 2022. 
2.14 Consultations 
2.15 Roads Development Team: No objection subject to conditions covering visibility splay
and access requirements. 
2.16 Protective Services: No objection subject to conditions relating to the submission of
Site Investigation Information and appropriate remediation measures if necessary.

Page 12

2.17 Greenspace: No objection subject to control of Japanese Knotweed. 
2.18 Coal Authority: No objection subject to intrusive site investigations being caried out
and remediation works. 
2.19 Scottish Water: No objection but contact to be made at the earliest opportunity with
Scottish Water to show strong evidence to support intended drainage plan prior to
making a connection. 
2.20 Representations 
2.21 There were no representations received in relation to the application. 
2.22 Review Submission 
2.23 The applicant has submitted a Review Statement and supporting documents contained
in full within the agenda papers annex. The statement expresses, in summary, the
applicant’s view that:- 
- The site is a vacant housing site which can be brought back into use given 20 years
since the previous houses were demolished.
- The proposed development is the same size and scale as previously approved
within the previously approved development boundaries.
- The development is an enhancement of an appropriate cluster form that mirrors
existing surrounding buildings.
- The visual improvement of a derelict and vacant housing site within the village
boundaries.
- The associated improvements to adjacent fields within owned by the applicant
which will be utilised for grazing ponies.
- The associated maintenance of roadside verges bounding the fields.
- The development will create a defined boundary between the proposed
development and the wider Rural Investment Area.
- The economic and social benefits of the continued living of the family and
associated businesses within the village.
- The proposal avoids extending any housing further into areas which have not
previously been zoned or occupied by housing.
- Will provide additional housing stock in the village which lacks housing stock. 
2.24 Representations subsequent to notification of interested parties of the notice of
Review 
2.25 No further representations have been submitted in response to the submission of the
Notice of Review. 
2.26 Conclusion and Decision on Proceeding with the Local Review Body Decision 
2.27 The appellant has requested that a site visit be carried out given that the land and
surroundings have changed significantly in recent years since Google Street View was
last updated and includes the partial implementation of the previous planning
permission and surrounding developments. 
2.28 As with all applications each case requires to be considered on its own merits and in
accordance with the development plan policies unless material considerations
outweigh the provisions of these policies. These are the factors and issues which
require to be considered by the Local Review Body when determining this application.

Page 13

2.29 The members are now requested to consider whether sufficient information is
provided within this LRB Report and the associated annex to proceed with the
hearing. 
3. Measures of success 
3.1  That the information provided is sufficient for the Local Review Body to determine the
appellants review submission.   
4. Supporting documentation 
4.1 The Planning Adviser Background Report will be accompanied by additional supporting
information contained within the background papers and includes:- 
- Planning Decision Notice.
- Report of Handling
- Planning Policy Documents
- Consultation Response
- Notice of Review and Supporting Documentation. 
4.2 North Lanarkshire Local Development Plan 2022 Policy Extracts

Page 14

No embedded text on this page.

Page 15

No embedded text on this page.

Page 16

Pamela Humphries
Head of Planning and Regeneration

Page 17

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?

Page 18

Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed?