The Scottish Government on Behalf of Blarghour Wind Farm Limited: Electricity Act Section 36C and Electricity Generating Stations (Applications for Variation of Consent) (Scotland) Regulations Consultation from the Energy Consents Unit for Proposed Variation to Blarghour Wind Farm (Consented 29 October 2021). the S36c Variation Proposes to Vary the S36 Consent from 17 Wind Turbines, 136.5M in Height to Blade Tip to 14 Wind Turbines, 180M in Height to Blade Tip: Land Approximately 7Km North West

Argyll and Bute Council · 20 December 2023
Back to Planning, Protective Services and Licensing Committee — 20 December 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Argyll and Bute Council
Development & Economic Growth   
This report is a recommended response to the Scottish Government’s Energy
Consents and Deployment Unit (ECDU) consultation on the Section 36C Variation
Application to the Section 36 consent granted on 29th October 2021 to construct and
operate Blarghour Wind Farm, on land approximately 7km north west of Inveraray
and 4.5km south of Portsonachan. 
Reference No: 23/00537/S36/ECU00004754 
Applicant: The Scottish Government on behalf of Blarghour Wind Farm
Limited 
Proposal: Electricity Act Section 36C and Electricity Generating
Stations (Applications for Variation of Consent)(Scotland)
Regulations  consultation from the Energy Consents Unit for
Proposed Variation to Blarghour wind farm (consented 29th
October 2021). The S36C variation proposes to vary the S36
consent from 17 wind turbines, 136.5m in height to blade tip
to 14 wind turbines, 180m in height to blade tip. 
Site Address:  Land approximately 7km north west of Inveraray and 4.5km
south of Portsonachan. 
(A)  THE APPLICATION 
Section 36C Variation Application made up of the following key elements: 
• Up to 14 turbines of a maximum ground to tip height of 180m
• a crane hardstanding area at each turbine base
• external turbine transformers adjacent to each turbine
• up to three meteorological masts or hardstanding areas for the placement of
remote sensing equipment for collecting meteorological data
• a network of access tracks, turning areas and passing bays linking the turbines
and the substations/ control building
• substations and compound
• control building
• three temporary construction compounds
• underground electrical, telecommunication and control cabling linking the
turbines with the substation
• up to three on site borrow pits
• a scheme of aviation lighting, including medium intensity red lights fitted to the
nacelle of turbines T2, T3, T5, T11, T12, T16 and T17
• an access track linking the A819 and
• associated ancillary works and engineering operations. 
Connection to Electricity Grid - The grid connection does not form part of the
section 36C application for the Proposed Varied Development. Any required
consent for the grid connection would typically be sought by the relevant owner of

Page 2

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
the local distribution or transmission network. The Network Operator would be
responsible for the consenting, construction and operation and maintenance of
the grid connection. 
(B) RECOMMENDATION: 
That the ECU be notified accordingly that: 
• That Argyll & Bute Council DOES NOT OBJECT to this application, subject
to the inclusion of the conditions recommended by consultees in any
consent granted by the ECU. These should also include the condition
proposed by the Applicant to allow the lighting scheme to be revisited in
the future to take account of emerging technological solutions which
would reduce the impacts of visible lighting, such as transponder radar
activated lighting. 
• Notwithstanding the above, it has not been possible for Argyll & Bute
Council to reach a conclusion on the acceptability of this proposal in
respect to Ornithological matters.  This is due to the fact that these matters
have not been resolved. 
• In respect to the outstanding Ornithological matters, Argyll & Bute Council
would defer to the expert advice of NatureScot and the RSPB. 
(C) CONSULTATIONS:    
ENERGY CONSENT UNIT RESPONSES: 
NatureScot (18th July 2023) – advice to the ECU is summarised as
follows: 
Ornithology 
• NatureScot advise there is a high risk the G/LAE1B golden eagle
territory could be abandoned. 
• NatureScot request clarification regarding the flight data used in the
CRM calculations and 
• NatureScot recommend post-construction monitoring. 
Landscape 
• The Landscape and Visual Impact Assessment (LVIA) and night-time
assessment do not allow a clear understanding as to how conclusions
have been reached by the Applicant and do not highlight/ identify new
significant effects or intensification of existing significant effects as a
result of the Proposal. NatureScot therefore consider that further work is
required to understand effects from the Proposal.

Page 3

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
• There would be intensified significant cumulative landscape and visual
effects when the Proposal is considered in-addition to and sequentially
with the nearby operational An Suidhe wind farm and new significant
combined and sequential cumulative effects with neighbouring
proposals. 
• The Proposal would introduce turbine lighting into an area of dark skies
around Loch Awe and would result in extensive new significant night-
time landscape and visual effects which would be compounded by new
cumulative night-time effects with the neighbouring proposals and 
• Significant intensified visual effects would extend up to around 13km and
would be mainly concentrated on settlements, roads and recreational
receptors on the west side of Loch Awe with new significant day-time
visual effects identified for six representative viewpoints. 
Applicant (21st August 2023) – submitted a rebuttal to NatureScot’s advice
to the ECU.  This concluded that, they remain confident that the submitted
LVIA and associated Technical Appendices are robust and provide a
transparent and fair assessment of the likely significant residual landscape
and effects of the Proposed Varied Development for both daytime and nigh
time periods and are based on contemporaneous guidance. The Proposed
Varied Development would not result in significant additional visibility, and
whilst undoubtedly being more prominent in views from a number of receptor
locations, would mainly result in levels of effect that are consistent with that
of the Consented Development. Whilst the reduced lighting scheme for the
Proposed Varied Development would give rise to some significant effects
on the character and visual amenity of the area, the principal affected
locations would be confined to localised viewpoints around Loch Awe and a
small number of summits adjoining the site, which are not known for frequent
visitation after dark. 
NatureScot (12th October 2023) – advised the ECU that the Applicant’s
rebuttal doesn’t raise any new issues that require them to reconsider their
advice issued on the 18th July 2023.  In line with their Service Statement
they do not intend to provide any more comment or advice, in relation to
landscape and visual consideration, prior to the case being determined. 
Historic Environment Scotland (HES) (6th June 2023) – advised the ECU
they do not object to the proposed variation. While they accept aspects of
the proposals will have an impact on the settings of a number of scheduled
monuments in the vicinity they do not consider those impacts merit objection
for their statutory interests. Although they consider the proposed
development would not raise issues of concern for their interests sufficient
to object to the scheme, the turbines would still have significant impacts on
the settings of: Ardchonnel Castle & Island of Innis Chonnel, Loch Awe
(SM291); Caisteal Suidhe Cheannaidh, dun 470m NW of Achnacraobh (SM
4120); Tom nan Clach, cup and ring marked rock 560m ENE of Hazelbank
(SM3246); and Ardchonnel, Long Cairn (SM4173). This could be mitigated
further by deleting, relocating or lowering the height of turbines T9, T10,
T11, T12 and T17. 
Transport Scotland (2nd May 2023) - advised the ECU they have no
objection, subject to conditions being attached to any consent to secure the

Page 4

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
submission and approval of an updated Abnormal Loads Assessment;
approval of the proposed route for any abnormal loads; approval of any
accommodation measures (removal of street furniture, junction widening,
traffic management); any additional signing or temporary traffic control
measures must be undertaken by a recognised Quality Assured traffic
management consultant; submission and approval of proposals for an
abnormal load delivery trial run to be undertaken with the involvement of
Police Scotland; submission and approval of a Construction Traffic
Management Plan (CTMP); all vehicles transporting construction material to
be sheeted; installation of vehicle wheel cleansing facilities; and prior to any
decommissioning, a Decommissioning Plan shall be prepared and
submitted for approval. 
Scottish Environment Protection Agency (4th May 2022) – advised the
ECU  they have no objection subject to a condition to secure the
submission of a detailed site-specific Peat Management Plan (PMP) for
approval to the determining authority, in consultation with SEPA, at least
two months prior to commencement of development.  This should
demonstrate how micrositing and other measures have been used to
further minimise peat disturbance following ground investigations and
detailed design work.  Additionally, SEPA recommend that Condition 7
(Micrositing) be amended to state that ‘no micrositing shall take place
within areas of peat of greater depth than the original location’. 
Scottish Forestry (3rd May 2023) – advised the ECU they note from the
variation information that the wind farm open ground will be reducing from
18.2ha to 15.2ha.  Scottish Forestry recommend that the new area of
15.2ha replace the 18.2ha in condition 10.  Replanting of Forestry ANNEX
2 – Part Two – Conditions attached to Deemed Planning Permission, of the
Consent.  Scottish Forestry have nothing more to add in relation to this
variation to the consented development. 
Royal Society for the Protection of Birds (RSPB) (2nd May 2023) –
provide advice to the ECU on: net biodiversity gain (NPF4); data used is
nearly 10 years old – an update would be prudent; directional lighting for
divers; cumulative impact – an area landscape scale management plan
should be established; breeding seasons monitoring for key species (to
inform HMP); location – turbines located outwith commercial forestry will
reduce open ground habitat for key bird species, as well as impacts on
peatland; and Grid connection and OHL - RSPB are aware that the Creag
Dhubh to Inveraray 275kV OHL is proposed to transect some of the
Blarghour Wind Farm HMP area. Discussions have taken place between
applicants, SSE and landowners regarding mitigating this loss. However,
the new area being allocated for the HMP is less than the area impacted. 
Scottish Water (13th March 2023) - advised the ECU they have no
objection. This does not confirm the proposal can be serviced.  Advice is
provided on: water assessment; foul assessment; drinking water protected
areas and surface water. 
Defence Infrastructure Organisation (25th April 2023) – advised the ECU
they have no objection, provided the extant conditional requirements that
the development is fitted with aviation safety lighting (Condition 23) and

Page 5

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
that sufficient data is submitted to ensure that structures can be accurately
charted to allow deconfliction are included in any new consent that may be
issued (Condition 22).   
National Air Traffic Services Safeguarding (NATS) (13th March 2023) –
advised the ECU the proposal has been examined by their technical
safeguarding teams and does not conflict with their safeguarding criteria. 
Accordingly, NATS has no safeguarding objection to the proposal. 
Highlands & Islands Airport Limited (HIAL) (3rd May 2023) – advised
the ECU that the proposal is located outwith their consultation zone, as
such they have no comment and need not be consulted further.  
Aberdeen International Airport response (13th March 2023) – advised
the ECU the proposal is located out with their consultation zone. As such
they have no comment. 
Glasgow Airport (30th March 2023) – advised the ECU the proposal has
been examined from an aerodrome safeguarding perspective and does not
conflict with safeguarding criteria and they have no objection. 
Glasgow Prestwick Airport (9th March 2023) – advised the ECU the
proposed development lies outside the GPA safeguarding area and
consequently they would have no comment or valid objection to make.  
Edinburgh Airport (14th March 2023) – advised the ECU  the proposal lies
out with the Aerodrome Safeguarding zone for Edinburgh Airport and they
have no objection. 
Joint Radio Company (10th March 2023) – advised the ECU they have
previously cleared this development and have nothing to add.  Clearance
still stands. 
Office for Nuclear Regulation (13th March 2023) – have advised the ECU
that they have no comment on the proposed development as it does not lie
within a consultation zone around a GB nuclear site. 
Met Office (10th March 2023) – have advised the ECU that the proposal is
not in any Met Office safeguarded areas.  Therefore they would not expect
any significant impact on their radar operation, and would not normally
expect to be consulted. 
Strachur Community Council (26th April 2023) – have advised the ECU
that they have no comments to make on this variation proposal. 
ARGYLL & BUTE COUNCIL RESPONSES 
ABC Consultant Landscape Architect Review (May 2023) – concludes
that the proposal would be much more prominent than operational wind
farms and would be visible in every open view from the southern half of
Loch Awe and across Loch Avich. However, the degree of change incurred
by the variation would not alter the already significant adverse effects
associated with the consented scheme in the context of the broad

Page 6

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
parameters considered in LVIA. Although there would be an exacerbation
of significant adverse landscape and visual effects, these effects would be
relatively limited in extent principally affecting the middle part of Loch Awe.
No designated or other formally valued landscapes would be significantly
affected by the proposal.  In view of the policies set out in NPF4, it is
recommended that no objection should be raised in terms of landscape and
visual effects. 
This proposal would introduce lighting to the dark skies of Loch Awe and
while the number of visual receptors is likely to be low during hours of
darkness, it is considered that it is imperative that radar activated lighting
should be installed at the earliest opportunity as this would substantially
reduce the duration and impact of night-time lighting.   
Significant adverse combined cumulative landscape and visual effects
would be likely to occur where this proposal was seen together and
sequentially with the An Carr Dubh, Eredine, Ladyfield and Beinn Ghlas
Repowering wind farm proposals. 
ABC Roads & Amenity Services (26th May 2023) – no objection subject to
the following conditions: connection of the site access to the public road to
be, 160 x 2.4 x 1.05 metres; connection the site access to the public road,
access to be constructed as per the Council’s standard detail drawing ref:
SD 08/001 Rev a, or otherwise agreed in writing by Roads & Infrastructure
Services; a  positive surface water drainage system to be installed to prevent
the discharge of surface water onto the public road, details to be agreed with
Roads & Infrastructure Services, prior to any works starting on site; Junction
geometry, surfacing and drainage to be fully completed, prior to any work
starting on site; Advanced warning signs for the site access to be erected
on either approach, prior to any works starting on site; Strictly no vehicular
access from the B840 East Lochaweside Road. All vehicles must enter and
exit the site from the A819 Inveraray - Dalmally Road; Traffic Management
Plan to be submitted for approval by Roads & Infrastructure Services, prior
to any work starting on site. The Traffic Management plan should include
details of all materials, plant, equipment, components and labour required
during the construction works; A detailed Method Statement in relation to
access and transport of materials, plant and equipment. Method statement
to be submitted for approval by Roads & Infrastructure Services, prior to any
work starting on site; and a detailed condition survey to be carried out
between the A83 Tarbet - Campbeltown Trunk Road / A819 Inveraray -
Dalmally Road junction and the application site, prior to any work starting on
site. The condition survey to be recorded by means of video and
photographs. A copy of the video and photographs to be submitted to Roads
& Infrastructure Services for approval, prior to any work starting on site. The
Area Roads Engineer also advises that a Road Opening Permit will be
required and there should be no surface water discharge. 
ABC Local Biodiversity Officer (LBO) (15th June 2023) – notes the
contents of the supporting documents for the ecological interest, these
outcomes are consistent with the original application as the Proposed
Varied Development would not have a significant effect on ecology or bird
interest; with regards to Peat interest, the predicted land take is to be less
than the original consent, the supporting documentation such as Peat
Management Plan, Peat Landslide Hazzard Risk Assessment along with

Page 7

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
the Outline Construction and Decommissioning Environmental
Management Plan are relevant even though there is a  reduction in turbines
and land take. The LBO notes that the cumulative impacts have also been
considered and the reassessment has resulted in no likely significant
ecological residual effects associated with the Proposed Varied
Development. Mitigation, including avoidance and minimisation of impacts
on sensitive ecological receptors and enhancement opportunities have
been identified. In summary, with the reduction in the number of turbines
from 17 to 14 with the addition of an increase in height, the ecological and
peat interests have been reviewed with the conclusion that there will be no
significant effect due to the reduction in land take and the management
details in specific management plans. 
ABC Flood Prevention Officer (30th May 2023) – no objections subject to
conditions.  It is recommended that planning conditions to the effect of the
following be attached to any consent granted for this application: any
proposed watercourse crossings should maintain and not to reduce the
existing capacity of the channel; and surface water drainage should be
designed in accordance with CIRIA C753 and Sewers For Scotland 4th
edition and ensure that post development surface water runoff does not
exceed the pre-development surface water runoff. The surface water
drainage should be in operation prior to the start of construction. 
ABC Environmental Health (10th May 2023) - advise that the current
arrangement is that Environmental Health are unable to review the
application and they suggest that Planning consider employing a noise
assessment contractor to assess this wind farm application. 
ABC Noise Consultant (31st October 2023) – concludes that in general,
good practice has been adopted by the Applicant with a few issues
identified.  The most significant of these issues are the omission of a key
receptor Blarghour House; and the omissions of two operational turbines
at Blarghour Farm nearby within the assessment of cumulative impacts. 
The two turbines were in operation at the time of the baseline noise survey
in 2017 and within around 550m of a baseline monitoring position.  The
influence of turbine noise on the results is not discussed or accounted for. 
However, it should be noted that the derived noise limits are not applied
within the assessment presented in the 2023 Variation Application.  Further
information on these aspects should be sought from the Applicant.
Following a satisfactory response to the above issued from the applicant,
it is considered that there would be no reasons to object to the scheme on
noise grounds.  A suitably worded condition such as that included in
Section 4 of the Noise Consultant’s report to limit the noise levels, tonality
and amplitude modulation should be applied to control noise levels from
the proposed scheme. 
Applicant’s response to ABC Noise Consultant’s advice (4th December
2023) – The Applicant provided a note responding to the request for
clarifications set out in the ABC Noise Consultants review in respect of
predicted noise impacts on Blarghour House, and the consideration of
cumulative noise impacts including the two Blarghour Farm 20 kW wind
turbines.

Page 8

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
The results presented by the Council’s Noise Consultant in their review
show that predicted operational noise levels from the Proposed Varied
Development are below the noise limit applied to the Consented
Development and the ETSU-R-97 simplified noise limit of 35 dB LA90 by a
minimum margin of 7.7 dB. Predicted operational noise levels are therefore
considered to be not significant as they comply with the limits already
imposed on the Consented Development 
In respect of the two small turbines at Blarghour Farm, notwithstanding that
these could be scoped out of the cumulative assessment due to their size
(the generating capacity of the two turbines is less than 50 kW), the
turbines are owned and operated by the residents of the properties at
Blarghour Farm who are directly financially involved with the Proposed
Varied (and Consented) Development. The relevant noise limit at
financially involved properties is 45 dB LA90, and predicted operational
noise levels from the Proposed Varied Development are negligible in
relation to the financially involved limit (i.e. they are 17.3 dB below the
financially involved noise limit), as well as contributing only an additional
0.4 dB to the cumulative operational noise levels of the two Blarghour Farm
turbines and An Càrr Dubh Wind Farm. No significant cumulative effects
are therefore predicted at Blarghour Farm and surrounding properties 
ABC Noise Consultant (8th December 2023) - has responded to the
Applicant’s note as follows: 
Missing Receptor – Blarghour House - The Council’s Noise Consultant
would agree that Blarghour House, and the associated properties should be
included in the assessment, and subsequent condition, noting that they are
‘financially involved’ for which a ‘lower fixed’ noise limit of up to 45dB LA90
can be applied. The applicant should clarify exactly which properties are
included in this for the avoidance of doubt, and whether a limit relative to
background, or just a fixed limit should be applied. The proposed planning
condition would need to be modified to include these limits for the affected
financially involved properties.  
Missing Consideration of the two turbines at Blarghour Farm - The Council’s
Noise Consultant considers that these two turbines should be included in
the cumulative assessment of noise, especially as they have no noise limit
attached to them. Whilst they agree that the planning assessment of a new
50kW turbine falls outside the scope of the IOAGPG, they would point out
that ETSU-R-97 states the following in respect of a cumulative assessment
at paragraph 58 “…absolute noise limits and margins above background
should relate to the cumulative effect of all wind turbines in the area which
contribute to the noise received at the properties in question…” There are
no exclusions for small turbines in the IOAGPG from the cumulative
assessment, and as noted in the Mott MacDonald report, there are
properties who would exceed the current proposed 35dB LA90 condition for
all properties when all turbine noise is taken into account. The Council
considers that it is important to set the appropriate limit in the event of a
tonal and / or AM penalty for enforcement purposes. The Council would
agree that the inclusion of the Blarghour Farm turbines in the cumulative
noise assessment would not change the conclusions reached in terms in
terms of noise impact of the scheme.

Page 9

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Amplitude Modulation Condition - The Council’s Noise Consultant confirms
that they consider an amplitude modulation condition to be necessary for
this wind farm as set out in their report. 
West of Scotland Archaeology Service (2nd August 2023) – have
confirmed that the proposed changes raise no archaeological issues. 
Please note: the above are summaries and the full consultee
responses can be viewed on the Energy Consent Unit and Argyll &
Bute Council websites. 
(D) REPRESENTATIONS:   
As the Council is not the determining Authority all letters of representation are
considered by the Energy Consents Unit.  At time of writing, public representation
figures stand at 4 objections, which are published on the ECU website. The main
issues raised are summarised below: 
• Adverse landscape and visual impact – unacceptable height, increased
damage to land due to requirement for larger foundations.
• Adverse impact on wildlife.
• Adverse impact on ornithology
• Adverse impact on tourism
• Adverse impact on human & animal health
• Poor community benefit
• Lack of Community Consultation
• Adverse impact on property values
• Adverse Tourism impact
• Wind Farms are not environmentally effective as claimed – renewable &
environmentally friendly are not the same thing.
• Potential for future applications to increase number of turbines
• Query whether this variation (height of turbine) would have been granted
originally or whether developer has used staged approach to secure consent
for larger turbines.
• Whilst number of turbines has been reduced, profitability and output will be
greater due to height increase.
• Existing wind farms are often stationary due to lack of grid demand (including
those existing at Loch Awe)
• Loch Awe is a place of great scenic beauty and worthy of National Scenic Area
status.  Scottish Government declined status and declared the entire area of
Loch Awe “identified as a wind development area”.
• Rapid deforestation combined with extensive peat bed drilling will cause
landslides
• Ongoing United Nations body investigation (Aarhus Convention Compliance
Committee ACCC) into whether the Scottish and UK governments have broken
international law through failure to allow the public the right to challenge
planning decisions that would damage the nations precious environment,
landscape and wildlife.  Complaint has found complaints admissible and a five
month time limit has been given for the governments to provide written
explanations.  Decision on this application should therefore be delayed until the
committee’s judgement is published.

Page 10

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Public Consultation – Whilst not a statutory requirement for Section 36 applications,
the applicant has undertaken Public Consultation. Further information on this is
contained in the Blarghour Statement of Community Consultation (October 2022)
which is available on the ECU website (reference: ECU00004754). 
Note: The comments raised above are addressed in the assessment of the
proposal at Appendix A of this report. 
Note: Please note that the letters of representation above have been summarised
and that the full letters of representation are available on the Energy Consents
Units website.   
(E) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report (EIAR): Yes 
EIAR (February 2023) presented in 4 volumes:   
• Volume 1: Non-Technical Summary (NTS)
• Volume 2: Main Report
• Volume 3a: Figures
• Volume 3b: Visualisations
• Volume 4: Technical Appendices 
Key topics covered in the EIAR include: Introduction; Description Proposed
Development; Comparative Environmental Assessment; Landscape and Visual
Amenity; Cultural Heritage; Ecology; Ornithology; Noise; Aviation and
Telecommunications; and Traffic and Transport. 
The EIAR should be read with the following supplementary documents: 
• Blarghour Planning Statement  (February 2023)
• Blarghour Statement of Community Consultation 
(ii) An Appropriate Assessment under the Conservation (Natural Habitats)
Regulations 1994:   NatureScot will advise 
(iii) A Design or Design/Access statement:   No 
(iv) A report on the impact of the proposed development e.g. Retail impact,
transport impact, noise impact, flood risk, drainage impact etc.:  All
relevant reports are encompassed within the EIAR    
(F) Statutory Development Plan (NPF4 and LDP) and any other material
considerations over and above those listed above which have been taken into
account in the assessment of the application:

Page 11

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Policy 1 – Tackling the Climate and Nature Crises
Policy 2 – Climate Mitigation and Adaption
Policy 3 – Biodiversity
Policy 4 – Natural Places
Policy 5 – Soils
Policy 6 – Forestry, Woodland and Trees
Policy 7 – Historic Assets and Places
Policy 11 – Energy
Policy 12 – Zero Waste
Policy 23 – Health and Safety
Policy 33 – Minerals 
Annex B – National Statements of Need 
3. Strategic Renewable Electricity Generation and Transmission Infrastructure 
‘Argyll and Bute Local Development Plan’ Adopted March 2015 
Policy LDP STRAT 1 – Sustainable Development
Policy LDP DM 1 – Development within the Development Management Zones 
Policy LDP 3 – Supporting the Protection Conservation and Enhancement of our
Environment 
Policy LDP 5 –Supporting the Sustainable Growth of our Economy 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables 
Policy LDP 8 – Supporting the Strength of our Communities
Policy  LDP 10 – Maximising our Resources and Reducing our Consumption
Policy  LDP 11 – Improving our Connectivity and Infrastructure 
‘Supplementary Guidance to the Argyll and Bute Local Plan 2015’ (Adopted
March 2016 & December 2016) 
SG LDP ENV 1 – Impact on Habitats, Species and our Biodiversity
SG LDP ENV 2 – Impact on European Sites
SG LDP ENV 4 – Impact on SSSIs and National Nature Reserves
SG LDP ENV 5 – Impact on Local Nature Conservation Sites (LNCS)
SG LDP ENV 6 – Impact on Trees / Woodland
SG LDP ENV 7 – Water Quality and the Environment
SG LDP ENV 11 – Protection of Soil and Peat Resources
SG LDP ENV 12 – Impact on National Scenic Areas (NSAs)
SG LDP ENV 13 – Impact on Areas of Panoramic Quality (APQs)
SG LDP ENV 14 – Landscape
SG LDP ENV 15 – Impact on Historic Gardens and Designed Landscapes
SG LDP ENV 16(a) – Impact on Listed Buildings
SG LDP ENV 19 – Impact on Scheduled Ancient Monuments (SAMs)
SG LDP ENV 20 – Impact on Sites of Archaeological Importance
SG LDP PG 1 – Planning Gain

Page 12

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
SG LDP BAD 1 – Bad Neighbour Development
SG LDP Sustainable – Sustainable Siting and Design Principles
SG LDP SERV 1 – Private Sewage Treatment Plants & Wastewater Systems
SG LDP SERV 2 – Incorporation of Natural Features / SuDS
SG LDP SERV 3 – Drainage Impact Assessment
SG LDP SERV 4 – Contaminated Land
SG LDP SERV 5 – Waste Related Development and Waste Management
SG LDP SERV 5(b) – Provision of Waste Storage & Collection Facilities within New
Development
SG LDP SERV 6 – Private Water Supplies and Water Conservation
SG LDP SERV 7 – Flooding and Land Erosion – Risk Framework
SG LDP MIN 2 – Mineral Extraction
SG LDP TRAN 1 – Access to the Outdoors
SG LDP TRAN 2 – Development and Public Transport Accessibility
SG LDP TRAN 4 – New & Existing, Public Roads & Private Access Regimes
SG LDP TRAN 6 – Vehicle Parking Provision
SG LDP TRAN 7 – Safeguarding of Airports 
Supplementary Guidance 2- Renewable Energy (December 2016) (December
2016) 
Note: The above supplementary guidance has been approved by the Scottish
Government. It therefore constitutes adopted policy and the Full Policies are
available to view on the Council’s Web Site at www.argyll-bute.gov.uk 
(ii)     List of all other material planning considerations taken into account in the
assessment of the application, having due regard to Annex A of Circular
3/2013. 
• Draft Energy Strategy and Just Transition Plan (January 2023)
• Onshore Wind Policy Statement (OWPS) (December 2022)
• Historic Environment Policy for Scotland (HEPS, 2019)
• Climate Change (Emissions Reduction Targets) (Scotland) Act 2019
• Scottish Government Good Practice Principles for Shared Ownership and
Community Benefit of Onshore Renewable Energy Developments (May 2019)
• Argyll & Bute Landscape Wind Energy Capacity Study (2017)
• Siting and Designing Wind Farms in the Landscape, SNH  (August 2017)
• ABC Technical Note – Biodiversity (Feb 2017)
• Onshore Wind Turbines: Planning Advice, Scottish Government (May 2014)
• Guidance for Landscape and Visual Impact Assessment, 3rd Edition, Landscape
Institute, and Institute of Environmental Management & Assessment, (2013)
• PAN 1/2011: ‘Planning and Noise’ (March 2011)
• The Scottish Government’s Policy on ‘Control of Woodland Removal’ (Forestry
Commission Scotland 2009) 
• PAN 60 – Planning for Natural Heritage (Jan 2008)
• Views of statutory and other consultees;
• Planning history of the site
• Legitimate public concern or support expressed on relevant planning matters 
Argyll & Bute proposed Local Development Plan 2 (November 2019) – The
Proposed Local Development Plan 2 (as modified following Examination) was
submitted to the Scottish Government on the 23rd October. The Scottish
Government notified the Council on the 16th of November that the period for

Page 13

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
consideration of the plan would be extended to 56 days. The Council therefore may
not adopt the Plan until after this 56 day period. 
Until LDP2 is adopted the Development Plan for Argyll & Bute consists of National
Planning Framework 4, the Adopted Local Development Plan and any associated
Supplementary Guidance. 
(G) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment: No an Environmental Impact Assessment was required.    
(H) Has the application been the subject of statutory pre-application consultation
(PAC):  No PAC is not required for S36 applications. 
(I) Does the Council have an interest in the site:  No 
(J) Requirement for a pre-determination hearing: No 
(K) Is the proposal consistent with the Development Plan: Not possible to conclude
at this time due to unresolved concerns raised by NatureScot. 
(L) Need for notification to Scottish Ministers or Historic Environment Scotland:
No 
Author of Report: Arlene Knox Date: 7th December 2023 
Reviewing Officer:                Sandra Davies   Date:               8th December 2023 
Fergus Murray
Head of Development & Economic Growth

Page 14

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
COMMITTEE REPORT 
APPENDIX A – RELATIVE TO APPLICATION NUMBER:  23/00537/S36 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. THE SECTION 36C CONSENTING REGIME 
1.1 Section 36 of the Electricity Act 1989 (“the 1989 Act”) applies to proposals for the
construction, extension or operation of an onshore electricity generating station whose
capacity exceeds (or, when extended, will exceed) 50 megawatts.  Applications to
construct or operate electricity generating stations below this threshold which do not
require section 36 consent are made to the local planning authority under the Town
and Country Planning (Scotland) Act 1997. On granting consent under section 36,
Scottish Ministers may also direct under section 57 of the Town and Country Planning
(Scotland) Act 1997 that planning permission is deemed to be granted for the
development necessary to construct the generating station and any ancillary
development. 
1.2 Section 20 of the Growth and Infrastructure Act 2013 inserted a new section 36C into
the 1989 Act to provide for the making of variations to section 36 consents. Prior to
2013, the 1989 Act did not provide for section 36 consents to be varied. 
1.3 Section 21 of the Growth and Infrastructure Act 2013 amended section 57 of the Town
and Country Planning (Scotland) Act 1997 to provide that Scottish Ministers, on varying
a section 36 consent, may give either a direction for planning permission to be deemed
to be granted, or a direction for an existing planning permission (or the conditions to
which that planning permission was made subject) to be varied as specified in the
direction. 
1.4 The Electricity Generating Stations (Applications for Variation of Consent) (Scotland)
Regulations 2013 (‘the 2013 Regulations’) came into force on 1 December 2013. The
regulations make provision for the content of a variation application and the
consultation process to be followed with respect to section 36C applications.  The
regulations also provide that the Scottish Ministers may cause a public local inquiry to
be held if they consider it appropriate to do so. 
1.5 The 2013 Regulations provided for a procedure which ensured that the relevant
provisions of Directive 2011/92/EU (now as amended by Directive 2014/52/EU) on the
assessment of the potential effects of certain public and private projects on the
environment (commonly known as the “Environmental Impact Assessment” or “EIA”
Directive) would be implemented as necessary in relation to applications to vary a
section 36 consent. 
1.6 The 2013 Regulations were amended by regulation 42 of the Electricity Works
(Environmental Impact Assessment) (Scotland) Regulations 2017 (as amended) (‘the
EIA Regulations’). The Electricity Works (Environmental Impact Assessment)
(Scotland) Regulations 2017 were amended in December 2017 (by The Electricity
Works (Environmental Impact Assessment) (Scotland) Amendment Regulations
2017). Note that at present there is no consolidated version of the EIA Regulations
available and the documents therefore need to be read together to comprehend the
EIA Regulations.  The EIA Regulations essentially apply to variation applications under
section 36C as they apply to applications for section 36 consent.

Page 15

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
1.7 The Council’s role in this process is one of a consultee along with various other
consultation bodies.   
1.8 The Development Plan is not the starting point for consideration of S36C applications. 
This is because Sections 25 and 37 of the Town & Country Planning (Scotland) Act
1997 which establish the primacy of LDP policy in decision-making, are not engaged
in the deemed consent process.  NPF4 and the Local Development Plan now form the
Statutory Development Plan.  Whilst the Statutory Development Plan does not have
primacy in S36C decision-making it still remains an important material consideration
informing the Council’s response to the proposal. 
1.9 Schedule 9 of the Electricity Act does require both the applicant and the decision-
maker to have regard to the preservation of amenity.  It requires that in the formulation
of proposals the prospective developer shall have regard to: 
(a) the desirability of preserving natural beauty, of conserving flora, fauna and
geological or physiological features of special interest and of protecting sites, buildings
and objects of architectural, historic or archaeological interest; and 
(b) shall do what he reasonably can to mitigate any effect which the proposals
would have on the natural beauty of the countryside or on any such flora, fauna,
features, sites, buildings or objects. 
Similarly, it obliges the Scottish Ministers in their capacity as decision maker to have
regard to the desirability of the matters at a) and the extent to which the Applicant has
complied with the duty at b).   
1.10 Consideration of the proposal against both NPF4 (2023) and the adopted Argyll & Bute
LDP 2015 will ensure that proper consideration is given by the Council to the extent to
which the proposal satisfies these Schedule 9 duties. 
1.11 It is open to the Council to either support or object to the proposal, and to recommend
conditions it would wish to see imposed in the event that authorisation is given by
Scottish Ministers. In the event of an objection being raised by the Council, the Scottish
Ministers are obliged to convene a Public Local Inquiry (PLI) if they are minded to
approve the proposal. They can also choose to hold a PLI in other circumstances at
their own discretion. Such an Inquiry would be conducted by a Reporter(s) appointed
by the Directorate for Planning and Environmental Appeals. In the event that consent
is given, either where there has been no objection from the Council, or where
objections have been overruled following PLI, the Council as Planning Authority would
become responsible for the agreement of matters pursuant to conditions, and for the
ongoing monitoring and enforcement.    
1.12 This report reviews the policy considerations which are relevant to this proposal and
the planning merits of the development, the views of bodies consulted by the Scottish
Government along with other consultations undertaken by the Council, and 3rd party
opinion expressed to the Scottish Government following publicity of the application by
them. It recommends views to be conveyed to the Scottish Government on behalf of
the Council before a final decision is taken on the matter.  The conclusion of this report
is to recommend that the Council does not object to this Section 36C consultation for
the reasons detailed in this report.

Page 16

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
2. SETTLEMENT STRATEGY 
2.1 Policy LDP DM1 establishes acceptable scales of development in three different
‘zones’ or the ‘Settlement Strategy’.  In terms of the local development plan proposals
map, the access route traverses through Rural Opportunity Area and Countryside
Zone, and the main wind farm site is located within ‘Very Sensitive Countryside’. In the
Very Sensitive Countryside, only specific categories of development are supported. 
This however includes renewable energy related development.  In principle, policy LDP
DM 1 supports renewable energy and ancillary developments in these areas, providing
they are consistent with all other Local Development Plan Policies.   
2.2 Policy 11 – Energy and Policy LDP 6: Renewable Energy provide the primary policy
framework for assessing wind farms.  In this case, it is considered that it has been
demonstrated that the scale and location of the proposal, will integrate sympathetically
without giving rise to adverse consequences in terms of: landscape & visual impact
(including cumulative).  However, due to the outstanding matters raised by NatureScot
it is not possible to reach a conclusion on whether the proposal is consistent with
Development Plan Policy in this regard.  For the reasons detailed below in this report,
it is considered that this proposal satisfies Development Plan Policy and associated
guidance in respect of renewable energy development in some respects.  Areas where
it has not been possible to reach a conclusion are also explained. 
2.3 Having due regard to the above it is not possible at this time to conclude whether
this proposal can be considered ‘sustainable’ or whether it is consistent with
the provisions of LDP DM1 – Development within the Development Management
Zones. 
3. ENERGY & SUPPORTING THE SUSTAINABLE GROWTH OF RENEWABLES 
3.1 Argyll & Bute Council is keen to ensure that Argyll & Bute continues to make a positive
contribution to meeting the Scottish Government’s targets for renewable energy
generation.  These targets are important given the compelling need to reduce our
carbon footprint and reduce our reliance on fossil fuels,  reinforced by the  Climate
Change (Emissions Reduction Targets) (Scotland) Act 2019. The Council will support
renewable energy developments where these are consistent with the principles of
sustainable development and it can be adequately demonstrated that there would be
no unacceptable significant adverse effects.   
3.2 This proposal has been assessed primarily against the criterion in the two lead
Statutory Development Plan policies relating to renewable energy.  These are: Policy
11 – Energy of National Planning Framework 4 and Policy LDP 6 – Supporting the
Sustainable Growth of Renewables of the Argyll & Bute Local Development Plan. 
Other policies are referred to where relevant.  It should be noted that in accordance
with the advice of the Chief Planner, where there are discrepancies between these
policies or the LDP policy is out-of-date, the default position is to defer to Policy 11 of
NPF4.  An example of this is the reference to SPP and the Spatial Framework in Policy
6.  SPP is no longer extant and the requirement for a Spatial Framework has not been
carried forward to NPF4.  Consequently, it has not been considered in this report. 
4. LOCATION, NATURE AND DESIGN OF PROPOSED DEVELOPMENT 
4.1 The site for the proposed development is located within Mid Argyll, between Loch Awe
and Loch Fyne, and lies approximately 7 km to the north west of Inveraray and
approximately 4.5 km to the south of Portsonachan. The site is located on land within

Page 17

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Blarghour and Balliemeanoch farms and includes areas of plantation forestry at Three
Bridges and Ardchonnel Forestry block. The site comprises an upland plateau
moorland with craggy outcrops, used mainly for sheep farming and commercial
forestry. 
4.2 The Site comprises an upland plateau moorland with craggy outcrops, used mainly for
sheep farming. The highest point on the site is located on its eastern edge, at 482 m
Above Ordnance Datum (AOD), where the ground slopes up towards Cruach Mhor
further to the east. The ground descends to approximately 230 m AOD at the western
boundary, and to approximately 60 m AOD where the proposed access route meets
the A819 at Three Bridges. 
4.3 Two areas of commercial forestry lie within the site. Access to the site would be from
the southeast, leaving the A819 and travelling through the Three Bridges forestry
plantation. To the northwest of the Site is the Ardchonnel forestry plantation. 
4.4 The site lies within four surface water catchments and is drained by a number of small
burns, including the Allt Mor and Allt na h-Airigh. These form tributaries to the larger
Allt Beochlich and Allt Blarghour, which flow into Loch Awe, and the River Aray, which
flows into Loch Fyne. The site is also characterised by a number of small lochans,
including the Lochan Cruaiche Bige. 
4.5 The wider area is characterised by the Cruach Mhor/Beinn Bhreac ridge line which
rises in between Loch Fyne and Loch Awe. The wider area is sparsely populated and
the lower ground on Loch Awe side is characterised by farms and holiday cottages,
with the closest located at Upper Barr Beithe, approximately 2.2 km to the northwest
of the nearest turbine. The nearest settlement is Portsonachan, situated approximately
4.5 km northwest of the site boundary. The nearest road is the A819 (Inveraray to
Dalmally) located adjacent to the site boundary. 
4.6 There are a number of proposed, consented and operational wind farm developments
located in the vicinity of the Proposed Varied Development.  The existing An Suidhe
wind farm is located approximately 4.5 km south of the Proposed Varied Development
and comprises 23 turbines with 100 m tip height. 
4.7 Consented development - The main components of the consented development are: 
• 17 turbines, of a maximum ground to tip height of 136.5 metres;
• a crane hardstanding area at each turbine base;
• external turbine transformers adjacent to each turbine;
• up to three permanent anemometer masts;
• a network of access tracks, turning areas and passing bays linking the turbines and
the substation/control building;
• substation and compound;
• control building;
• three temporary construction compounds;
• underground electrical, telecommunication and control cabling linking the turbines
with the substation; 
• up to three on site borrow pits; 
• an access track linking the site with the A819; and
• associated ancillary works and engineering operations. 
4.8 Proposed Varied Development – the main components of the Proposed Varied
Development are:

Page 18

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
• Up to 14 turbines of a maximum ground to tip height of 180 m;
• a crane hardstanding area at each turbine base;
• external turbine transformers adjacent to each turbine;
• up to three meteorological masts or hardstanding areas for the placement of
remote sensing equipment for collecting meteorological data;
• a network of access tracks, turning areas and passing bays linking the turbines and
the substations/ control building;
• substations and compound;
• control building;
• three temporary construction compounds;
• underground electrical, telecommunication and control cabling linking the turbines
with the substation
• up to three on Site borrow pits;
• a scheme of aviation lighting, including medium intensity red lights fitted to the
nacelle of turbines T2, T3, T5, T11, T12, T16 and T17;
• an access track linking the A819; and
• associated ancillary works and engineering operations. 
4.9 Key Changes – the key changes may be summarised as follows: 
• Reduction in number of turbines from 17 to 14 (removal of T1, T4 and T7)
• Increase in tip height from 136.5m to 180m (43.5m increase)
• Access track length - removal of 2.14 km of track
• Turbine Foundations & Hardstanding’s, temporary infrastructure land take (per
turbine): 0.28 hectares (ha). Permanent land take (per turbine): 0.28 (ha) – no
change in per turbine land take
• Meteorological Mast - Increase of up to 33 m. Potential to install remote sensing
equipment instead of meteorological masts.
• Substation - Additional buildings for network operator. The area of the substation
compound will not change in size.
• Lighting - As the proposed turbine tip height exceeds the 150 m threshold, a
scheme of aviation lighting will be required. The Applicant would seek to agree a
suitable lighting scheme with the planning authority in consultation the Civil
Aviation Authority (CAA). The Proposed Varied Development assessed includes
lighting on the nacelle of turbine T2, T3, T5, T11, T12, T16 and T17. The Applicant
proposes a condition of consent which would allow the lighting scheme to be
revisited in the future to take account of emerging technological solutions which
would reduce the impacts of visible lighting, such as transponder radar activated
lighting. 
4.10 Connection to Electricity Grid - The grid connection does not form part of the section
36C application for the Proposed Varied Development. Any required consent for the
grid connection would typically be sought by the relevant owner of the local distribution
or transmission network. The Network Operator would be responsible for the
consenting, construction and operation and maintenance of the grid connection.  
Infrastructure   
4.11 Scottish Water have advised the ECU that they have no objection to this proposal. This
does not confirm the proposal can be serviced.  Advice is also provided on: water
assessment; foul assessment; drinking water protected areas and surface water. 
4.12 Water Assessment – they have advised that there is no public Scottish Water, Water
infrastructure within the vicinity of this proposed development therefore they would

Page 19

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
advise applicant to investigate private options. 
4.13 Foul Assessment – they have advised that there is no public Scottish Water, Waste
Water infrastructure within the vicinity of this proposed development therefore they
would advise applicant to investigate private treatment options. 
4.14 Drinking Water Protected Areas – they have confirmed that there are no Scottish Water
drinking water catchments or water abstraction sources, which are designated as
Drinking Water Protected Areas under the Water Framework Directive, in the area that
may be affected by the proposal.  
4.15 Surface Water - For reasons of sustainability and to protect customers from potential
future sewer flooding, Scottish Water have advised that they will not accept any surface
water connections into their combined sewer system. 
5. NET ECONOMIC IMPACT, INCLUDING LOCAL AND COMMUNITY SOCIO-
ECONOMIC BENEFITS 
5.1 Policy 11 – Energy of NPF4 states that proposals will only be supported where they
maximise net economic impact, including local and community socio-economic
benefits such as employment, associated business and supply chain opportunities. 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables of the Argyll & Bute
Local Development Plan require all applications for wind turbine developments to be
assessed in terms of net economic impact, including local and community socio-
economic benefits such as employment, associated business and supply chain
opportunities. 
5.2 The project would bring a socio-economic benefits to the local community, including
the creation of jobs and opportunities for local businesses and suppliers during the
construction phase and for the lifetime of the project. The Applicant is also committed
to paying a community benefit package of £5,000 per MW of installed capacity for
every year of operation. There are several options for distributing these funds for the
benefit of the local community. In addition, the Applicant will be offering the community
a shared ownership opportunity with this wind farm. Community Benefit is not however,
considered to be a ‘material planning consideration’ in the determination of planning
applications. If consent were to be granted, the negotiation of any community benefit,
either directly with the local community or under the auspices of the Council, would
take place outside the application process. 
5.3 Having due regard to the above it is considered a degree of net economic impact,
including local and community socio-economic benefits, typical of such
developments will be provided.  It is therefore concluded that the proposal is
consistent with the provisions of Policy 11 – Energy of NPF4, Policies LDP DM1
– Development within the Development Management Zones; LDP 6 – Supporting
the Sustainable Growth of Renewables and Supplementary Guidance 2 of the
Argyll & Bute Local Development Plan. 
6. IMPACTS ON COMMUNITIES AND INDIVIDUAL DWELLINGS, INCLUDING
RESIDENTIAL AMENITY, VISUAL IMPACT, NOISE AND SHADOW FLICKER 
6.1 Policy 11 – Energy of NPF4 requires that project design and mitigation will demonstrate
how impacts on communities and individual dwellings, including, residential amenity,
visual impact, noise and shadow flicker have been addressed.  Policy LDP 6 –
Supporting the Sustainable Growth of Renewables of the Argyll & Bute Local

Page 20

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Development Plan require all applications for wind turbine developments to be
assessed in terms of impacts on communities and individual dwellings, including visual
impact, residential amenity, noise and shadow flicker (including cumulative).   
6.2 Noise - Mott MacDonald Ltd (MM) and Alistair Somerville Associates were
commissioned by Argyll & Bute Council to undertake a peer review of the noise
assessment for the proposed amendment to Blarghour wind farm.  This review
included a desktop assessment against current good practice, a check of the predicted
noise levels from the wind farm, and a site survey of the area surrounding the wind
farm site including the nearest residential receptors.  A report was produced which
summarises the findings of the review. 
6.3 The desktop review and site survey conclude that, in general, good practice has been
adopted by the Applicant, with a few issues identified.  The most significant of these
issues are: 
• The omission of a key receptor Blarghour House
• The omission of two operational turbines at Blarghour Farm nearby within the
assessment of cumulative impacts. 
6.4 The two turbines were in operation at the time of the baseline noise survey in 2017
and within around 550m of a baseline monitoring position.  The influence of turbine
noise on the results is not discussed or accounted for.  However, it should be noted
that the derived noise limits are not applied within the assessment presented in the
2023 Variation Application.   
6.5 Further information on these aspect should be sought from the Applicant. Following a
satisfactory response to the above issued from the applicant, it is considered that there
would be no reasons to object to the scheme on noise grounds.  A suitably worded
condition such as that included in Section 4 of the Noise Consultant’s report to limit the
noise levels, tonality and amplitude modulation should be applied to control noise levels
from the proposed scheme. 
6.6 A note was received from the Applicant in response to the matters raised by the
Council’s Noise Consultant on the 4th December 2023. This note responds to the
request for clarifications set out in the MM review in respect of predicted noise impacts
on Blarghour House, and the consideration of cumulative noise impacts including the
two Blarghour Farm 20 kW wind turbines. The results presented by MM in their review
show that predicted operational noise levels from the Proposed Varied Development
are below the noise limit applied to the Consented Development and the ETSU-R-97
simplified noise limit of 35 dB LA90 by a minimum margin of 7.7 dB. Predicted
operational noise levels are therefore considered to be not significant as they comply
with the limits already imposed on the Consented Development. 
6.7 The Applicant goes on to explain that, in respect of the two small turbines at Blarghour
Farm, notwithstanding that these could be scoped out of the cumulative assessment
due to their size (the generating capacity of the two turbines is less than 50 kW), the
turbines are owned and operated by the residents of the properties at Blarghour Farm
who are directly financially involved with the Proposed Varied (and Consented)
Development. The relevant noise limit at financially involved properties is 45 dB LA90,
and predicted operational noise levels from the Proposed Varied Development are
negligible in relation to the financially involved limit (i.e. they are 17.3 dB below the
financially involved noise limit), as well as contributing only an additional 0.4 dB to the

Page 21

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
cumulative operational noise levels of the two Blarghour Farm turbines and An Càrr
Dubh Wind Farm. No significant cumulative effects are therefore predicted at Blarghour
Farm and surrounding properties. 
6.8 ABC Noise Consultant has responded to the Applicant’s note as follows: 
• Missing Receptor – Blarghour House - The Council’s Noise Consultant would agree
that Blarghour House, and the associated properties should be included in the
assessment, and subsequent condition, noting that they are ‘financially involved’ for
which a ‘lower fixed’ noise limit of up to 45dB LA90 can be applied. The applicant should
clarify exactly which properties are included in this for the avoidance of doubt, and
whether a limit relative to background, or just a fixed limit should be applied. The
proposed planning condition would need to be modified to include these limits for the
affected financially involved properties. 
• Missing Consideration of the two turbines at Blarghour Farm - The Council’s Noise
Consultant considers that these two turbines should be included in the cumulative
assessment of noise, especially as they have no noise limit attached to them. Whilst
they agree that the planning assessment of a new 50kW turbine falls outside the scope
of the IOAGPG, they would point out that ETSU-R-97 states the following in respect of
a cumulative assessment at paragraph 58 “…absolute noise limits and margins above
background should relate to the cumulative effect of all wind turbines in the area which
contribute to the noise received at the properties in question…” There are no
exclusions for small turbines in the IOAGPG from the cumulative assessment, and as
noted in the Mott MacDonald report, there are properties who would exceed the current
proposed 35dB LA90 condition for all properties when all turbine noise is taken into
account. The Council considers that it is important to set the appropriate limit in the
event of a tonal and / or AM penalty for enforcement purposes. The Council would
agree that the inclusion of the Blarghour Farm turbines in the cumulative noise
assessment would not change the conclusions reached in terms in terms of noise
impact of the scheme. 
• Amplitude Modulation Condition - The Council’s Noise Consultant confirms that they
consider an amplitude modulation condition to be necessary for this wind farm as set
out in the Mott MacDonald Report. 
6.9 Shadow Flicker – was considered at Scoping Stage and analysis of the site context
demonstrated that there are no properties within the potential zone of shadow flicker
effects it was concluded that no further assessment was required, and that shadow
flicker could be scoped out of the EIAR for the Proposed Varied Development. 
6.10 Any Residential Amenity and Visual Impact matters are considered below in the section
on Significant Landscape & Visual Impact. 
6.11 Having due regard to the above it is concluded that the proposal is acceptable
in terms of any potential shadow flicker impact and Noise subject to the
conditions recommended by the Council’s Noise Consultant and is therefore
consistent with the provisions of Policy 11- Energy, and Policies LDP STRAT 1 –
Sustainable Development; LDP DM1 – Development within the Development
Management Zones; LDP 3 – Supporting the Protection, Conservation and
Enhancement of our Environment; LDP 6 – Supporting the Sustainable Growth
of Renewables and Supplementary Guidance 2 of the Argyll & Bute Local
Development Plan.

Page 22

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
7. SIGNIFICANT LANDSCAPE AND VISUAL IMPACTS 
7.1  Policy 11 – Energy of NPF 4 requires that project design and mitigation demonstrates
how significant landscape and visual impacts have been addressed, recognising that
such impacts are to be expected for some forms of renewable energy.  Where impacts
are localised and/or appropriate design mitigation has been applied, they will generally
be considered to be acceptable. Policy 4 a)  – Natural Places of NPF4 states that
proposals which by virtue of type, location or scale will have an unacceptable impact
on the natural environment, will not be supported.  Policy LDP 6 – Supporting the
Sustainable Growth of Renewables of the Argyll & Bute Local Development Plan
requires all applications for wind turbine developments to be assessed against
landscape and visual impacts. 
7.2 The Council’s Consultant Landscape Architect, Carol Anderson has undertaken a
Landscape & Visual Review of this proposal, which is based on examination of the
Environmental Impact Assessment Report (EIAR). 
7.3  The proposal - The consented Blarghour wind farm comprised 17 turbines, 136.5m
high to blade tip.  The revised proposal is for 14 turbines, 180m to blade tip.  Visible
aviation lighting would be required on 7 turbines and the lighting strategy set out in the
EIAR proposes a condition whereby lighting would be reviewed in future to take
account of technological advances which may allow installation of a transponder radar
activated lighting system.  The adoption of such a system would significantly reduce
the duration of lighting coming on during hours of darkness. 
7.4 Landscape effects - The proposed development lies within the Craggy Upland
Landscape Character Type (LCT) and would have direct significant adverse effects on
its character.  The increased height of the turbines would extend the influence of the
proposal on this LCT to some degree when compared with the consented scheme. 
Significant adverse effects would be more sever on the smaller scale fringes of Loch
Awe (part of the shore is defined as the Rocky Mosaic LCT) and on the narrow waters
of the loch itself.  The larger turbines proposed would increase the magnitude of effect
on Loch Awe and its shores.  Visible aviation lighting would also introduce lighting to
the dark skies of the sparsely settled Loch Awe area further diminishing its remote and
little developed character. 
7.5  Visual effects - The comparative Zone of Theoretical Visibility map (Figure 4.6c) shows
that there would be no difference in the extent of visibility between the consented
scheme and the current proposal which comprises larger turbines.  However, while
increasing the height of the consented turbines by 43.5m would not extend the area of
visibility, it would result in some changes to views.  These changes do not generally
result in an increase magnitude of effect on views within the broad parameters used in
the Landscape and Visual Impact Assessment (LVIA).  For example, the LVIA for the
consented scheme concluded that a major significant adverse effect would occur on
views from Inverinan (Viewpoint 4) and while the proposed increase of turbines to 180
would exacerbate effects on this view, as this is the most severe measure of
significance defined, no further increase is possible within the scope of the LVIA. 
7.6  The increase in height of the turbines results in some hubs being visible from
viewpoints where only the tips of turbines within the consented scheme would be seen.
This occurs in Viewpoints 5 from the B840 on the west side of Loch Awe, Viewpoint 6
from Dun na Cuaiche Tower within the Inveraray Castle Inventory listed Garden and
Designed Landscape and from Viewpoint 9 from the Loch Avich Road.

Page 23

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
7.7 Principal effects on views would be from: 
• The west side of Loch Awe, from the unclassified road/NCR 78, the road to Loch Avich
and from promoted footpaths and viewpoints. The larger 180m high turbines would
increase discordancy with the smaller operational An Suidhe wind turbines seen in
views from this area and turbine lighting would also extend the duration of significant
adverse effects. EIAR Viewpoints 3 and 14 illustrate these effects. 
• From the settlements of Dalavich and Inverinan (Viewpoints 1, 2 and 4) where larger
turbines would increase the magnitude of effect (but not above the major adverse
effects already associated with the consented scheme for Viewpoints 2 and 4 as
explained above). Turbine lighting would extend the duration of significant adverse
effects. 
7.8 Cumulative landscape and visual effects with other proposed wind farms - Significant
combined cumulative landscape and visual effects would occur where this proposal
was seen together with the An Carr Dubh wind farm which lies within 1.5km of the
proposal. Both developments would be largely seen together and would substantially
increase the extent of very large wind turbines seen on the skyline of uplands which
enclose the eastern side of Loch Awe. The proposed Eredine, Ladyfield and Bheinn
Ghlas repowering wind farm developments would also contribute to significant adverse
combined cumulative effects on landscape and views principally when seen together
and sequentially in the Loch Awe area. 
7.9 Conclusions - The proposal would be much more prominent than operational wind
farms and would be visible in every open view from the southern half of Loch Awe and
across Loch Avich. However, the degree of change incurred by the variation would not
alter the already significant adverse effects associated with the consented scheme in
the context of the broad parameters considered in LVIA. Although there would be an
exacerbation of significant adverse landscape and visual effects, these effects would
be relatively limited in extent principally affecting the middle part of Loch Awe. No
designated or other formally valued landscapes would be significantly affected by the
proposal. In view of the policies set out in NPF4, it is recommended that no objection
should be raised in terms of landscape and visual effects. 
7.10 This proposal would introduce lighting to the dark skies of Loch Awe and while the
number of visual receptors is likely to be low during hours of darkness, it is considered
that it is imperative that radar activated lighting should be installed at the earliest
opportunity as this would substantially reduce the duration and impact of night-time
lighting. 
7.11 Significant adverse combined cumulative landscape and visual effects would be likely
to occur where this proposal was seen together and sequentially with the An Carr
Dubh, Eredine, Ladyfield and Beinn Ghlas Repowering wind farm proposals. 
7.12 Key visualisations for the Committee to review include: 
• Viewpoint 1: Dalavich 
• Viewpoint 2: Dalavich Jetty 
• Viewpoint 3: Loch Avich Road 
• Viewpoint 4: Inverinan 
• Viewpoint 10: Kilmaha 
• Viewpoint 14: B840 East of Ford

Page 24

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
The comparative wireline visualisations in Figures 4.28-46 (Viewpoints 1-4, 10 and 14)
should also be reviewed as these show the differences between the consented
scheme and the proposed variation. It should be noted that the cover pages of the
Main EIAR Report and the Non-Technical Summary documents appear to use a
visualisation of the consented scheme and not the proposed variation from Viewpoint
2 at Dalavich Jetty. Comparison of this cover visualisation with the same viewpoint
from the February 2023 EIAR usefully shows the increased vertical extent of the larger
turbines now proposed in relation to landform and other features (the photographic
context missing from the comparative wirelines) 
7.13 NatureScot have provided the ECU with the following landscape advice (summary) – 
• The Landscape and Visual Impact Assessment (LVIA) and night-time assessment
do not allow a clear understanding as to how conclusions have been reached by
the Applicant and do not highlight/ identify new significant effects or intensification
of existing significant effects as a result of the Proposal. NatureScot therefore
consider that further work is required to understand effects from the Proposal; 
• There would be intensified significant cumulative landscape and visual effects
when the Proposal is considered in-addition to and sequentially with the nearby
operational An Suidhe wind farm and new significant combined and sequential
cumulative effects with neighbouring proposals; 
• The Proposal would introduce turbine lighting into an area of dark skies around
Loch Awe and would result in extensive new significant night-time landscape and
visual effects which would be compounded by new cumulative night-time effects
with the neighbouring proposals; and 
• Significant intensified visual effects would extend up to around 13km and would be
mainly concentrated on settlements, roads and recreational receptors on the west
side of Loch Awe with new significant day-time visual effects identified for six
representative viewpoints. 
7.14 Officer’s Conclusion - Whilst the Council objected to the previous scheme and caused
a Public Inquiry to be held, Scottish Ministers did not concur with our objection and
granted consent.  It is noted from the advice of the Council’s Landscape Consultant
that the degree of change incurred by the variation would not alter the already
significant adverse effects associated with the consented scheme In relation to
landscape and visual impacts. Officers have taken this advice into account and agree
that the Council should not object on the grounds of Landscape & Visual Impact. 
7.15 Furthermore, the concerns raised by NatureScot are noted and will be a matter for the
Energy Consents Unit to consider/resolve prior to reaching a decision on this
application.  
7.16 Having due regard to the above it is concluded that the proposal complies with
the provisions of Policies 11 – Energy and  4 – Natural Places of National
Planning Framework 4, and Policies LDP STRAT 1 – Sustainable Development;
LDP DM1 – Development within the Development Management Zone; LDP 3 –
Supporting the Protection, Conservation and Enhancement of our Environment;
Policy LDP 6 – Supporting the Sustainable Growth of Renewables; SG LDP ENV

Page 25

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
14 –Landscape and Supplementary Guidance 2 Renewable Energy of the Argyll
& Bute Local Development Plan.   
8. IMPACTS ON TOURISM AND RECREATION 
8.1 Policy 11 – Energy of NPF4 does not require Impacts on tourism to be considered –
this criterion is no longer included.  Policy LDP 6 – Supporting the Sustainable Growth
of Renewables of the Argyll & Bute Local Development Plan require all applications
for wind turbine developments to be assessed against impacts on tourism and
recreation. 
8.2 Tourism – It is acknowledged that Policy 11 of NPF4 does not include a requirement
for the impact of proposals on tourism to be assessed.  However, Policy LDP 6 of the
Local Development Plan does.  In Argyll & Bute the landscape is regarded as being a
particularly valued asset both in terms of its intrinsic qualities and in terms of its value
to the tourism economy. For all types of development the maintenance of landscape
character is an important facet of decision-making in the countryside in Argyll & Bute,
regardless of the scale of development proposed. 
8.3 The Council’s LDP Policy LDP 6 identifies impacts on tourism and recreation as a
material consideration in the assessment of renewable energy developments on the
basis that inappropriate developments with significant adverse effects which contribute
to the degradation of landscape character are unlikely to be in the interests of the Argyll
tourism economy. 
8.4 As Tourism and Landscape & Visual matters are intrinsically linked, and there is little
evidence to demonstrate whether or not wind farms adversely affect tourism, it is
considered that such impacts are covered in the landscape and visual impact
assessment of the proposal. 
8.5 Having due regard to the above it is considered that the proposals is consistent
with the provisions of Policy 11 - Energy, and Policies LDP STRAT 1 –
Sustainable Development; LDP DM1 – Development within the Development
Management Zones; LDP 3 – Supporting the Protection, Conservation and
Enhancement of our Environment; LDP 6 – Supporting the Sustainable Growth
of Renewables; SG LDP TRAN 1 – Access to the Outdoors; and Supplementary
Guidance 2 of the Argyll & Bute Local Development Plan. 
9. PUBLIC ACCESS 
9.1 Policy 11 – Energy of NPF4 requires that project design and mitigation demonstrates
how impacts on public access are addressed, including impact on long distance
walking and cycling routes and scenic routes.  Policy LDP 6 – Supporting the
Sustainable Growth of Renewables of the Argyll & Bute Local Development Plan
requires all applications for wind turbine developments to be assessed against impacts
on public access, including impact on long distance walking and cycling routes and
those scenic routes identified in the NPF. 
9.2 The proposal will be visible from some key routes, but will not have any adverse impact
on public access.  
9.3 Having due regard to the above subject to a condition to secure an Access
Management Plan in the event that consent is granted it is considered that the

Page 26

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
proposal is consistent with the provisions of Policy 11- Energy, and Policies LDP
STRAT 1 – Sustainable Development; LDP DM1 – Development within the
Development Management Zones; LDP 3 – Supporting the Protection,
Conservation and Enhancement of our Environment; LDP 6 – Supporting the
Sustainable Growth of Renewables; SG LDP TRAN 1 – Access to the Outdoors;
and Supplementary Guidance 2 of the Argyll & Bute Local Development Plan. 
10. AVIATION AND DEFENCE INTERESTS INCLUDING SEISMOLOGICAL
RECORDING    
10.1 Policy 11 – Energy of NPF4 requires that project design and mitigations demonstrates
how impacts on aviation and defence interests including seismological recording have
been addressed.  Policy LDP 6 – Supporting the Sustainable Growth of Renewables
and of the Argyll & Bute Local Development Plan requires impacts on aviation and
defence interests and seismological recording to be addressed.  Policy SG LDP TRAN
7 – Safeguarding of Airports of the Argyll & Bute Local Development Plan states that
development will be refused where it would constrain the present and future operations
of existing airports and airfields. 
10.2 The Ministry of Defence (MOD) have advised the ECU they have no objection to this
application, provided that the extant conditional requirements that the development is
fitted with aviation safety lighting (Condition 23) and that sufficient data is submitted to
ensure that structures can be accurately charted to allow deconfliction are included in
any new consent that may be issued (Condition 22).   
10.3 Edinburgh Airport have advised the ECU the proposal lies out with the Aerodrome
Safeguarding zone for Edinburgh Airport and they have no objection. 
10.4 Aberdeen International Airport have advised the ECU that the proposal is located out
with their consultation zone.  As such they have no comment to make and need not be
consulted further.   
10.5 Highlands and Islands Airports Limited (HIAL) have advised the ECU that the proposal
is located outwith their consultation zone, as such they have no comment and need
not be consulted further. 
10.6 National Air Traffic Services Safeguarding (NATS) – have advised the ECU that the
proposal has been examined by their technical safeguarding teams and does not
conflict with their safeguarding criteria.  Accordingly, NATS has no safeguarding
objection to the proposal. 
10.7 Glasgow Prestwick Airport have advised the ECU the proposed development lies
outside the GPA safeguarding area and consequently they would have no comment
or valid objection to make. 
10.8 Glasgow Airport have advised the ECU the proposal has been examined from an
aerodrome safeguarding perspective and does not conflict with safeguarding criteria
and they have no objection. 
10.9 Having due regard to the above, subject to the conditions recommended by the
Ministry of Defence, it is concluded the proposal is consistent with the
provisions of Policy 11 – Energy of National Planning Framework 4, Policy LDP
6 – Supporting the Sustainable Growth of Renewables, Policy SG LDP TRAN 7 –

Page 27

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Safeguarding of Airports, Supplementary Guidance 2 – Renewable Energy of the
Argyll & Bute Local Development Plan in this respect. 
11. TELECOMMUNICATIONS AND BROADCASTING INSTALLATIONS 
11.1 Policy 11 – Energy of NPF4 requires that project design and mitigation demonstrates
how impacts on telecommunications and broadcasting installations, have been
addressed particularly, ensuring that transmission links are not compromised.  Policy
LDP 6 – Supporting the Sustainable Growth of Renewables and Supplementary
Guidance 2 of the Argyll & Bute Local Development Plan requires all applications for
wind turbine developments to be assessed against impacts on telecommunications
and broadcasting installations particularly ensuring that transmission links are not
compromised.    
11.2 The Joint Radio Company have advised the ECU that they have previously cleared
this development and do not have anything to add.  Clearance still stands. The Met
Office have advised the ECU that the proposal is not in any Met Office safeguarded
areas.  Therefore they would not expect any significant impact on their radar operation,
and would not normally expect to be consulted. The Office for Nuclear Regulation have
advised the ECU that they have no comment on the proposed development as it does
not lie within a consultation zone around a GB nuclear site.  It is therefore concluded
that impacts on telecommunications and broadcasting links have been satisfactorily
addressed. 
11.3 Having due regard to the above it is concluded that the proposal will not have
any adverse impacts on telecommunications, broadcasting installations and
transmission links (including cumulative impacts) and is consistent with the
provisions of Policy 11- Energy of National Planning Framework 4, Policy LDP 6
– Supporting the Sustainable Growth of Renewables and Supplementary
Guidance 2 of the Argyll & Bute Local Development Plan in this respect. 
12. ROAD TRAFFIC AND ADJACENT TRUNK ROADS 
12.1 Policy 11 – Energy of NPF4 requires that project design and mitigation demonstrates
how impacts on road traffic and on adjacent trunk roads have been addressed,
including during construction.  Policy LDP 6 – Supporting the Sustainable Growth of
Renewables of the Argyll & Bute Local Development Plan requires all applications for
wind turbine developments to be assessed against impacts on road traffic and impacts
on adjacent trunk roads.  Policy SG LDP TRAN 4 – New and Existing, Public Roads
and Private Access Regimes of the Argyll & Bute Local Development Plan requires
that accesses which connect to or impact significantly on a Trunk Road require
consultation with Transport Scotland. 
12.2 Transport Scotland (TS) – advised the ECU that based on the information provided
they have no objection to the application subject to conditions being attached to any
consent that may be awarded to secure the submission and approval of an updated
Abnormal Loads Assessment; approval of the proposed route for any abnormal loads;
approval of any accommodation measures (removal of street furniture, junction
widening, traffic management); any additional signing or temporary traffic control
measures must be undertaken by a recognised Quality Assured traffic management
consultant; submission and approval of proposals for an abnormal load delivery trial
run to be undertaken with the involvement of Police Scotland; submission and approval
of a Construction Traffic Management Plan (CTMP); all vehicles transporting

Page 28

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
construction material to be sheeted; installation of vehicle wheel cleansing facilities;
and prior to any decommissioning, a Decommissioning Plan shall be prepared and
submitted for approval.  
12.3 The Council’s Roads & Amenity Services have advised that they have no objection
subject to the following conditions: connection of the site access to the public road to
be, 160 x 2.4 x 1.05 metres; connection the site access to the public road, access to
be constructed as per the Council’s standard detail drawing ref: SD 08/001 Rev a, or
otherwise agreed in writing by Roads & Infrastructure Services; a  positive surface
water drainage system to be installed to prevent the discharge of surface water onto
the public road, details to be agreed with Roads & Infrastructure Services, prior to any
works starting on site; Junction geometry, surfacing and drainage to be fully
completed, prior to any work starting on site; Advanced warning signs for the site
access to be erected on either approach, prior to any works starting on site; Strictly no
vehicular access from the B840 East Lochaweside Road. All vehicles must enter and
exit the site from the A819 Inveraray - Dalmally Road; Traffic Management Plan to be
submitted for approval by Roads & Infrastructure Services, prior to any work starting
on site. The Traffic Management plan should include details of all materials, plant,
equipment, components and labour required during the construction works; A detailed
Method Statement in relation to access and transport of materials, plant and
equipment. Method statement to be submitted for approval by Roads & Infrastructure
Services, prior to any work starting on site; and a detailed condition survey to be carried
out between the A83 Tarbet - Campbeltown Trunk Road / A819 Inveraray - Dalmally
Road junction and the application site, prior to any work starting on site. The condition
survey to be recorded by means of video and photographs. A copy of the video and
photographs to be submitted to Roads & Infrastructure Services for approval, prior to
any work starting on site. The Area Roads Engineer also advises that a Road Opening
Permit will be required and there should be no surface water discharge. 
12.4 Having due regard to the above, subject to the relevant conditions being
attached in the event that consent is granted it is concluded that the proposal is
consistent with the provisions of Policy 11 – Energy of National Planning
Framework 4, Policy LDP 6 – Supporting the Sustainable Growth of Renewables,
SG LDP TRAN 4 – New and Existing, Public Roads and Private Access Regimes,
and Supplementary Guidance 2 – Renewable Energy of the Argyll & Bute Local
Development Plan. 
13. HISTORIC ENVIRONMENT 
13.1 Policy 11 – Energy of NPF4 requires that project design and mitigation demonstrates
how impacts on the historic environment have been addressed.  Policy 7 – Historic
Assets and Places of NPF4 intent is to protect and enhance historic environment
assets and places, and to enable positive change as a catalyst for the regeneration of
places.  Policy LDP 6 – Supporting the Sustainable Growth of Renewables of the Argyll
& Bute Local Development Plan requires all applications for wind turbine developments
to be assessed against impacts on the historic environment, including scheduled
monuments, listed buildings and their settings. 
13.2 Historic Environment Scotland (HES) – have advised the ECU they do not object to
the proposed variation to the existing Section 36 consent for Blarghour Wind Farm.
While they accept aspects of the proposals will have an impact on the settings of a
number of scheduled monuments in the vicinity they do not consider those impacts
merit objection for their statutory interests. Although they consider the proposed

Page 29

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
development would not raise issues of concern for their interests sufficient to object to
the scheme, the turbines would still have significant impacts on the settings of:
Ardchonnel Castle & Island of Innis Chonnel, Loch Awe (SM291); Caisteal Suidhe
Cheannaidh, dun 470m NW of Achnacraobh (SM 4120); Tom nan Clach, cup and ring
marked rock 560m ENE of Hazelbank (SM3246); and Ardchonnel, Long Cairn
(SM4173). This could be mitigated further by deleting, relocating or lowering the height
of turbines T9, T10, T11, T12 and T17. 
13.3 The West of Scotland Archaeology Service (WOSAS) – have confirmed that the
proposed changes raise no archaeological issues. 
13.4 Having due regard to the above it is considered that the proposal is consistent
with the provisions of Policy 11 – Energy and Policy 7 – Historic Assets and
Places of National Planning Framework 4, Policy LDP 6 – Supporting the
Sustainable Growth of Renewables, SG and Supplementary Guidance 2 –
Renewable Energy of the Argyll & Bute Local Development Plan. 
14. HYDROLOGY, THE WATER ENVIRONMENT AND FLOOD RISK 
14.1 Policy 11 – Energy of NPF4 requires that project design and mitigation demonstrates
how effects on hydrology, the water environment and flood risk have been addressed. 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables of the Argyll & Bute
Local Development Plan requires all applications for wind turbine developments to be
assessed against impacts arising from effects on hydrology, the water environment
and flood risk (including cumulative).  Policy SG LDP SERV 7 – Flooding and Land
Erosion - The Risk Framework for Development of the Argyll & Bute Local
Development Plan provides guidance on the type of development that will be generally
permissible within specific flood risk areas. It requires flood risk assessments, drainage
impact assessments, or land erosion risk appraisals to accompany application where
required. 
14.2 The Council’s Flood Prevention Officer – has advised that they have no objections
subject to conditions.  It is recommended that planning conditions to the effect of the
following be attached to any consent granted for this application: any proposed
watercourse crossings should maintain and not to reduce the existing capacity of the
channel; and surface water drainage should be designed in accordance with CIRIA
C753 and Sewers For Scotland 4th edition and ensure that post development surface
water runoff does not exceed the pre-development surface water runoff. The surface
water drainage should be in operation prior to the start of construction. 
14.3 Having due regard to the above, subject to the relevant conditions being
attached in the event that consent is granted it is concluded that the proposal is
consistent with the provisions of Policy 11 – Energy of National Planning
Framework 4, Policy LDP 6 – Supporting the Sustainable Growth of Renewable,
Policy SG LDP SERV 7 – Flooding and Land Erosion - The Risk Framework for
Development and Supplementary Guidance 2 – Renewable Energy of the Argyll
& Bute Local Development Plan. 
15. BIODIVERSITY 
15.1 Policy 11 – Energy of NPF4 requires that project design and mitigation demonstrate
how impacts on biodiversity, including birds have been addressed.  Policy 3 –
Biodiversity of NPF4 requires development proposals to protect biodiversity, reverse

Page 30

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
biodiversity loss, deliver positive effects from development and strengthen nature
networks. Policy 5 – Soils of NPF4 supports the generation of energy from renewable
sources that optimises the contribution of the area to GHG emissions reduction targets
on peatland, carbon-rich soils and priority peatland. A detailed site specific assessment
will be required for development on peatland which will include the likely net effects of
the development on climate emissions and loss of carbon. (Impacts on carbon rich
soils and reference to the carbon calculator have not been carried forward from
SPP).  Policy LDP 6 – Supporting the Sustainable Growth of Renewables of the Argyll
& Bute Local Development Plan requires all applications for wind turbine developments
to be assessed against impacts arising from effects on the natural heritage, including
birds and to be assessed against impacts on carbon rich soils, using the carbon
calculator (including cumulative)    
Ornithology 
15.2 NatureScot have provided the ECU with the following Ornithology advice (summary).
They advise there is a high risk the G/LAE1B golden eagle territory could be
abandoned; request clarification regarding the flight data used in the CRM
calculations; and recommend post-construction monitoring. 
15.3 The Royal Society for the Protection of Birds Scotland (RSPB) – provides the following
advice to the ECU: 
• Ideally such a variation should consider the more positive requirements of net
biodiversity gain as set out in NPF4. 
• Volume 5 – Confidential annexe contains an updated CRM for key species
however the data this uses is approaching 10 years old.  An update on key species
and their usage of the area i.e. nest site usage would be prudent ideally including
some reassessment of site use through VP observations.  However, RSPB note
that recent GET modelling has been used for Golden Eagle which allays some of
these concerns. 
• RSPB note that no directional lighting is proposed for divers based on experience
of birds habituated to oil/gas industry in Shetland – RSPB recommend following
best practice to reduce potential impacts here. 
• This area is under consideration for multiple wind farm applications and OHL
upgrades; as such the RSPB advise that an area landscape scale management
plan should be established between different wind farms; this should include
consideration of grid connections and OHL upgrades.  Such an approach would
show a willingness between developers within the onshore renewables sector to
fully commit to meet requirements for positive effects for biodiversity as set out in
NPF4. 
15.4 EIA Considerations and variation – RSPB advise that breeding seasons monitoring for
key species should ideally be continued up to and through the scoping, application,
and construction process; and indeed, post construction to inform HMP. 
15.5 It is disappointing that the scheme is not located more within the commercial forestry
and indeed this change results in fewer turbines (loss of T4 and T7) within what is a
low value man-made habitat. Turbines located out with commercial forestry will reduce
open ground habitat for key bird species, as well as impacts on peatland.

Page 31

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
15.6 Grid connection and OHL - RSPB are aware that the Creag Dhubh to Inveraray 275kV
OHL (ECU00003442) is proposed to transect some of the Blarghour Wind Farm HMP
area. Discussions have taken place between applicants, SSE and landowners
regarding mitigating this loss. However, the new area being allocated for the HMP is
less than the area impacted. It is disappointing given the scale of these proposals and
financing behind them that this issue is proving difficult to rectify. 
15.7 RSPB Scotland remains concerned that there lacks a joined-up approach to planning
renewable energy and transmission infrastructure, which causes impacts to the
detriment of nature in Argyll. RSPB Scotland is supportive of the use of renewable
energy due to the urgent need to tackle the climate crisis. However, we are also facing
a biodiversity crisis, with significant declines in the abundance and numbers of species
in Scotland (NatureScot, 2019). 
15.8 Given the high degree of renewable energy developments and associated OHL
upgrades/substation infrastructure across Argyll, RSPB Scotland strongly advise that
a holistic landscape scale approach is established between developers and
landowners. In order to enable the efficient and impactful use of available
land/resources for both the siting of proposal and to support coordinated Habitat
Management Plans – increasing habitat availability and landscape permeability for
protected species and so support the priority that planning policy (NPF4) places on the
nature and the climate crisis. 
Peat    
15.9 SEPA have reviewed the EIAR and understand the application proposed the following
changes to the development consented on the 29th October 2021 under EC00005267: 
• Reduce the total number of turbines to 14 (removal of T1, T4 and T7 and
associated tracks.
• Increase the maximum tip height of the turbines from 136.5m to a maximum of
180m.
• Change the layout of the consented substation within the consented footprint. 
These alterations do not raise any issues in SEPA’s remit. SEPA therefore have no
objection subject to the following condition, as per their response to the original
application (dated 05 April 2019), being applied to this permission: 
15.10 To ensure that any changes to the peat reuse proposals because of further post
consent investigation are appropriate and in line with current guidance, SEPA request
a condition is imposed requiring the developer to prepare and submit a detailed site-
specific Peat Management Plan (PMP) for approval to the determining authority, in
consultation with SEPA, at least two months prior to commencement of development. 
This should demonstrate how micrositing and other measures have been used to
further minimise peat disturbance following ground investigations and detailed design
work. 
15.11 Additionally, SEPA recommend that Condition 7 (Micrositing) be amended to state that
‘no micrositing shall take place within areas of peat of greater depth than the original
location’. 
15.12 The Council’s Local Biodiversity Officer – notes the contents of the supporting
documents for the ecological interest, these outcomes are consistent with the original

Page 32

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
application as the Proposed Varied Development would not have a significant effect
on ecology or bird interest; with regards to Peat interest, the predicted land take is to
be less than the original consent, the supporting documentation such as Peat
Management Plan, Peat Landslide Hazzard Risk Assessment along with the Outline
Construction and Decommissioning Environmental Management Plan are relevant
even though there is a  reduction in turbines and land take. The LBO notes that the
cumulative impacts have also been considered and the reassessment has resulted
in no likely significant ecological residual effects associated with the Proposed Varied
Development. Mitigation, including avoidance and minimisation of impacts on
sensitive ecological receptors and enhancement opportunities have been identified.
In summary, with the reduction in the number of turbines from 17 to 14 with the
addition of an increase in height, the ecological and peat interests have been
reviewed with the conclusion that there will be no significant effect due to the
reduction in land take and the management details in specific management plans. 
15.13 In light of the above advice provided by NatureScot and the RSPB to the ECU and the
fact that ornithological matters remain to be addressed, it is not possible for Officers to
reach a conclusion on the proposals acceptability in this regard.  It is recommended
that this matter is deferred to the expert advice of NatureScot and RSPB Scotland.  In
terms of Peat, Officers are satisfied to support the recommendation of SEPA, including
suggested conditions. 
15.14 Having due regard to the above, due to the unresolved ornithological matters it
is not possible at this time for a conclusion to be reached on whether or not the
proposal is consistent with the provisions of Policies 11 – Energy and 3 –
Biodiversity of NPF4, and Policies LDP STRAT 1 – Sustainable Development;
LDP DM1 – Development within the Development Management Zone; LDP 3 –
Supporting the Protection, Conservation and Enhancement of our Environment;
Policy LDP 6 – Supporting the Sustainable Growth of Renewables; SG LDP ENV
1 – Development Impact on Habitats, Species and Our Biodiversity (i.e.
biological diversity) and Supplementary Guidance 2 of the Argyll & Bute Local
Development Plan. 
15.15 In respect to peat, it is considered that the proposal is consistent with the
provisions of Policies 11 – Energy, 3 – Biodiversity, and 5 – Soils of NPF4, and
Policies LDP STRAT 1 – Sustainable Development; LDP DM1 – Development
within the Development Management Zone; LDP 3 – Supporting the Protection,
Conservation and Enhancement of our Environment; Policy LDP 6 –Supporting
the Sustainable Growth of Renewables; SG LDP ENV 1 – Development Impact
on Habitats, Species and Our Biodiversity (i.e. biological diversity); SG LDP ENV
7 – Water Quality and the Environment; SG LDP ENV 11 – Protection of Soil and
Peat Resources and Supplementary Guidance 2 of the Argyll & Bute Local
Development Plan. 
16.    TREES, WOODS AND FORESTS 
16.1 Policy 11 – Energy of NPF4 requires that project design and mitigation will demonstrate
how impacts on trees, woods and forests have been addressed. Policy 6 – Forestry,
woodland and Trees of NPF4 intent is to protect and expand forests, woodland and
trees.   Policy SG LDP ENV 6 - Development Impact on Trees / Woodland of the Argyll
& Bute Local  Development Plan states that Argyll & Bute Council will resist
development likely to have an  adverse impact on trees by ensuring that adequate

Page 33

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
provision is made for the preservation of  and where appropriate the planting of new
woodland/trees, including compensatory planting  and management agreements. 
16.2 Scottish Forestry – advised the ECU they note from the variation information that the
wind farm open ground will be reducing from 18.2ha to 15.2ha.  Scottish Forestry
recommend that the new area of 15.2ha replace the 18.2ha in condition 10.  Replanting
of Forestry ANNEX 2 – Part Two – Conditions attached to Deemed Planning
Permission, of the Consent.  Scottish Forestry have nothing more to add in relation to
this variation to the consented development. 
16.3 Having due regard to the above it is concluded that subject to the conditions
recommended by Scottish Forestry being attached in the event that the proposal
receives consent it is consistent with the provisions of Policies 11 – Energy and
6 – Forestry, woodland and Trees of NPF4 and Policies LDP STRAT 1 –
Sustainable Development; LDP DM1 – Development within the Development
Management Zone; LDP 3 – Supporting the Protection, Conservation and
Enhancement of our Environment; LDP 6 – Supporting the Sustainable Growth
of Renewables; SG LDP ENV 6 - Development Impact on Trees / Woodland; SG
LDP ENV 1 – Development Impact on Habitats, Species and Our Biodiversity (i.e.
biological diversity); SG LDP ENV 7 – Water Quality and the Environment;
Supplementary Guidance 2 Renewable Energy; of the Argyll & Bute Local
Development Plan. 
17. DECOMMISSIONING, SITE RESTORATION AND QUALITY OF SITE
RESTORATION PLANS 
17.1 Policy 11 – Energy of NPF4 requires that project design and mitigation demonstrates
how proposals for the decommissioning of developments, including ancillary
infrastructure, and site restoration have been addressed. It also requires that project
design and mitigation demonstrates how the quality of site restoration plans have been
addressed including the measures in place to safeguard or guarantee availability of
finances to effectively implement those plans. Policy LDP 6 – Supporting the
Sustainable Growth of Renewable and of the Argyll & Bute Local Development Plan
requires all applications for wind turbine developments to be assessed against impacts
arising from the need for conditions relating to the decommissioning of developments,
including ancillary infrastructure, and site restoration and the need for a robust
planning obligation to ensure that operators achieve site restoration.    
17.2 At the end of the project’s operational life (approximately 30 years), a decision would
be made as to whether to refurbish, remove, or replace the turbines. If refurbishment
or replacement were to be chosen, relevant planning applications would be made. If a
decision were to be taken to decommission the Proposed Varied Development, this
would entail the removal of all the turbine components, transformers, the substation
and associated buildings. Access tracks and underground cables would be left in place
and foundations removed to a depth of 0.5 m below ground level to avoid
environmental impacts from removal. A Decommissioning Plan would set out
environmental protection measures and restoration principles which would be
implemented. This Plan would be agreed with ABC.  It is recommended that this matter
is covered by planning conditions consistent with other projects across Argyll & Bute
in the event that the proposal obtains consent from the ECU.   
17.3 Having due regard to the above it is concluded that subject to an appropriate
condition being attached in the event that the proposal receives consent the
proposal is consistent with the provisions of Policy 11 – Energy of NPF4 and

Page 34

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables and
Supplementary Guidance 2 of the Argyll & Bute Local Development Plan 
18. CUMULATIVE IMPACTS    
18.1 Policy 11 – Energy of NPF4 requires that project design and mitigation will demonstrate
how cumulative impacts have been addressed. Policy LDP 6 – Supporting the
Sustainable Growth of Renewables of the Argyll & Bute Local Development Plan also
requires cumulative impacts to be addressed.   Any cumulative impacts which have
been identified are covered in the preceding sections of this report. 
19. RENEWABLE ENERGY GENERATION TARGETS AND GREENHOUSE GAS
EMISSIONS REDUCTION TARGETS. 
19.1 Policy 11 – Energy of NPF4 requires that, in considering the impacts of the proposal,
significant weight will be placed on the contribution of the proposal to renewable
energy generation targets and on greenhouse gas emissions reduction targets.  Policy
1 – Tackling the climate and nature crises of NPF4 requires that when considering all
development proposals significant weight will be given to the global climate and nature
crises.  Policy LDP 6 – Supporting the Sustainable Growth of Renewables of the Argyll
& Bute Local Development Plan require all applications for wind turbine developments
to be assessed against the scale of contribution to renewable energy generation
targets and greenhouse gas emissions. 
19.2 The Proposed Varied Development would consist of 14 three bladed horizontal axis
turbines with a maximum tip height of 180 m. The proposed turbines would each have
individual generating capacity of around 6 MW, resulting in an anticipated projected
output of 84 MW for the Proposed Varied Development. 
19.3 The Proposed Varied Development would generate renewable electricity and would
therefore displace carbon dioxide (CO2) emissions associated with electricity
generation, which would otherwise be supplied via other forms of power generation
requiring the combustion of fossil fuels. The Scottish Government Carbon Calculator
for Wind Farm on Peatlands has been used to calculate a payback period for the
Proposed Varied Development based on the full development lifecycle. The results of
this assessment indicate that the Proposed Varied Development would have an
expected payback period of 2.8 years compared to grid mix of electricity generation.
The Proposed Varied Development would save approximately 54,624 tonnes of
carbon dioxide per year (compared to a typical grid mix of electricity supply). This
equates to supplying 72,451 homes with renewable electricity. 
19.4 When decision makers are considering the impacts detailed in Policy 11 they need to
give significant weight to the contribution of the proposed development to renewable
energy generation targets and on GHG emissions reduction targets. The recently
published OWPS sets a minimum target of 20GW of deployed onshore wind by 2030
which is an additional 12GW. In addition, Policy 1 – Tackling the climate and nature
crises of NPF4 states that significant weight is to be given to the global climate and
nature crises when considering all development proposals. 
19.5 Having due regard to the above it is considered that the proposal by its very
nature is consistent with the provisions of Policies 1 – Tackling the climate and
nature crisis and 11 – Energy of National Planning Framework 4, Policies LDP 3
– Supporting the Protection, Conservation and Enhancement of our

Page 35

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Environment, LDP 6 – Supporting the Sustainable Growth of Renewables, LDP
STRAT 1 – Sustainable Development, LDP DM1 – Development within the
Development Management Zones,  and Supplementary Guidance 2 – Renewable
Energy of the Argyll & Bute Local Development Plan. 
20. GRID CAPACITY & ENERGY STORAGE 
20.1 Policy 11 – Energy of NPF4 requires that grid capacity should not constrain renewable
energy development.  It is for developers to agree connections to the grid with the
relevant network operator.  Policy LDP 6 – Supporting the Sustainable Growth of
Renewables of the Argyll & Bute Local Development Plan require all applications for
wind turbine developments to be assessed against impacts arising from opportunities
for energy storage. 
20.2 Opportunities for energy storage - This proposal does not includes a battery energy
storage system (BESS).  The benefit of such a system would be to store energy from
the proposal or excess electricity from the national grid, providing stability to the
electricity supply network, meeting energy demands and providing improved energy
security.  Guidance from the Chief Planner where there are discrepancies between
Local Development Plan Policies and the Policies of NPF4 is that NPF4 should prevail. 
There is no requirement in NPF4 for BESS to be provided. 
20.3 Having due regard to the above it is considered that the proposal is consistent
with the provisions of Policy 11 – Energy of National Planning Framework 4,
Policy 6 – Supporting the Sustainable Growth of Renewables and
Supplementary Guidance 2 – Renewable Energy of the Argyll & Bute Local
Development Plan in this respect. 
21. PERPETUITY 
21.1 Policy 11 – Energy of NPF4 requires that consents for development proposals may be
time limited.  Areas identified for wind farms are, however, expected to be suitable for
use in perpetuity.  It is acknowledged that areas identified for wind farms are expected
to be suitable for use in perpetuity.   However, as the operational life of the
Proposed Varied Development would be 30 years, should consent be granted
for this proposal Officers would expect it to be time limited to 30 years to reflect
the life of the wind farm as detailed in the EIAR. 
22. CONCLUSION 
22.1 This proposal is classed as “Strategic Renewable Electricity Generation” - a National
Development, in terms of the Spatial Strategy given its capacity to generate and store
more than 50MW. In principle, there is support for this scale of development given its
importance in the delivery of Scotland’s Spatial Strategy.  However, such projects are
still required to be assessed against the provisions of the Development Plan, which
now consists of National Planning Framework 4 and the Argyll & Bute Local
Development Plan. 
22.2 The lead Development Plan policies support renewable energy development in
principle, but requires that proposals are assessed against the criterion detailed in this
report.  While the weight to be given to each of the considerations is a matter for the
decision maker, NPF4 is clear that significant weight will require to be placed on the
contribution of the proposal to renewable energy generation targets and on

Page 36

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
greenhouse gas emission reduction targets.  However, a balance still requires to be
reached in terms of the impact of the development. 
22.3 In relation to landscape and visual impacts NPF4 advises that where impacts are
localised and / or appropriate design mitigation has been applied such effects will
generally be considered acceptable. However NPF4 must be read as a whole and
detailed consideration given to linked policies. Policy 4 (Natural Places) – sets out that
development proposals which by virtue of type, location or scale will have an
unacceptable impact on the natural environment will not be supported. It is considered
that this proposal will have a significant adverse landscape and visual impact which is
not outweighed by social, environmental or economic benefits and is therefore
consistent with the provisions of the Development Plan in this regard. 
22.4 Development Plan Policy also requires Biodiversity impacts to be resolved – there are
outstanding Ornithological matters that still require to be addressed.  It has therefore
not been possible for officers to reach a conclusion on the acceptability of this proposal
in terms of policy in this regard.  In terms of Ornithology, the Council would defer to the
expert advice of NatureScot and the RSPB. 
22.5 The Scottish Government gives considerable commitment to renewable energy and
encourages Planning Authorities to support the development of wind farms where they
can operate successfully in appropriate locations. This is not however blanket support
without qualification. In considering the appropriateness of the development,
significant weight has been given to these matters. In addition, the fact that there is an
existing consent for this site and the advice of the Council’s Landscape Consultant is
not to object on Landscape & Visual Grounds.   
22.6 In conclusion, firstly, it is recommended by Officers that the Council does not object to
this application subject to the inclusion of any conditions recommended by consultees
in any consent granted by the ECU.  These should also include the condition proposed
by the Applicant to allow the lighting scheme to be revisited in the future to take account
of emerging technological solutions which would reduce the impacts of visible lighting,
such as transponder radar activated lighting.  Secondly, that it is brought to the
attention of the ECU that it has not been possible to draw a conclusion on Biodiversity
due to the fact that these matters have not been resolved.  Thirdly, to highlight to the
ECU that the Council would defer to the expert advice of NatureScot and the RSPB on
the outstanding ornithological matters.  
23. RECOMMENDATION 
23.1 That the ECU be notified accordingly that: 
• That Argyll & Bute Council DOES NOT OBJECT to this application, subject
to the inclusion of any conditions recommended by consultees in any
consent granted by the ECU. These should also include the condition
proposed by the Applicant to allow the lighting scheme to be revisited in the
future to take account of emerging technological solutions which would
reduce the impacts of visible lighting, such as transponder radar activated
lighting. 
• Notwithstanding the above, it has not been possible for Argyll & Bute Council
to reach a conclusion on the acceptability of this proposal in respect to

Page 37

LDP2 format template Nov 2023
Report of Handling Template for PPSL and Delegated Planning Applications – Updated 10.11.2023 
Ornithological matters.  This is due to the fact that these matters have not
been resolved. 
• In respect to the outstanding Ornithological matters, Argyll & Bute Council
would defer to the expert advice of NatureScot and the RSPB.