Mr Kevin Burnett: Renewal of Planning Permission in Principle Reference 18/02720/Ppp - Site for Proposed Residential Development: Site at Lonan Drive, Oban: (Ref: 23/00376/Ppp)

Argyll and Bute Council · 20 December 2023
Back to Planning, Protective Services and Licensing Committee — 20 December 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Argyll and Bute Council
Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning
Permission in Principle 
Reference No: 23/00376/PPP
Planning Hierarchy: Local 
Applicant: Mr Kevin Burnett 
Proposal: Renewal of Planning Permission in Principle Reference
18/02720/PPP – Site for Proposed Residential Development 
Site Address:  Site at Lonan Drive, Oban 
DECISION ROUTE 
☐Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997 
☒Committee - Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission 
• Site for proposed residential development 
• Formation of vehicular access 
(ii) Other specified operations 
• Connection to public water main 
• Connection to public drainage system 
(B) RECOMMENDATION: 
Having due regard to the Development Plan and all other material considerations, it
is recommended that planning permission in principle (PPP) be granted subject the
conditions and reasons appended to this report. 
(C) CONSULTATIONS:   
Argyll and Bute Council – Roads Authority 
Report dated 10/03/23 advising no objection to the proposed development subject to
a number of conditions being imposed on the grant of permission.  The response
from the Roads Authority is discussed in more detail in the main assessment in
Appendix A of this report. 
Argyll and Bute Council – Development Policy Team (DPT)

Page 2

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Memo dated 29/03/23 noting that the application is for the renewal of the previous
permission granted for the site and providing a policy background in terms of the
adopted Local Development Plan, proposed Local Development Plan 2 and National
Planning Framework 4.  The application is assessed against the relevant policy
framework in the assessment contained with Appendix A of this report. 
Argyll and Bute Council – Biodiversity Officer (BDO) 
E-mail dated 04/04/23 reiterating the advice set out in her response to the previous
application raising no objection to the proposed development subject to a number of
conditions being imposed on the grant of permission to secure the submission of
survey and management information when any detailed application(s) for the site is
submitted.  Such surveys to include species surveys for Bats and Red Squirrel; Peat
Management Plan; Tree Survey which should be undertaken prior to drafting the
design plan for the placement of dwellings, verges, access routes and services; and
finally a Japanese Knotweed Eradication Plan. 
Argyll and Bute Council – Oban Airport 
No response at time of report. 
Argyll and Bute Council – Access Officer 
No response at time of report. 
Scottish Water 
Letter dated 13/03/23 raising no objection to the proposed development which would
be serviced from the Tullich Water Treatment Works and the Oban Waste Water
Treatment Works.  Scottish Water do however advise that this does not confirm that
the proposed development can currently be serviced and advise that further
investigations will be required once formal applications for connection are submitted
for consideration.  Scottish Water further advise that the proposed development is
within the proximity of existing Scottish Water assets and the applicant should be
aware that any conflict with assets identified may be subject to restrictions on
proximity of construction. 
JBA Consulting Ltd (JBA) 
Report dated 28/03/23 advising no objection to the proposed development subject to
conditions being imposed on the grant of permission to secure a detailed drainage
assessment at full planning stage and a requirement for the surface water drainage
system to be designed in accordance with CIRIA C753 and Sewers For Scotland 4th
Edition.  JBA further advise that, should a SuDS pond be proposed, this should be
detailed on the site plan submitted at full planning stage. 
Oban Community Council (OCC)
E-mail dated 30/03/23 objecting to the proposed development.  In summary the
points raised are: 
• There is insufficient depth within the site to create a SuDS which Scottish Water
and SEPA will require. 
• Machinery which has been on site has infested the site with Japanese knotweed
which now cover over half of the site which will take many years and a great
expense to remove.  OCC provide an example eradication condition imposed on
a development in Tarbert. 
• The site has been neglected by its owners and has become an important public
open space for residents and the local primary campus who use it as an outside
classroom for nature learning.

Page 3

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
• If refused it is believed that there will be community support for the purchase of
the site as an open space/nature reserve. 
Comment:  The Council’s flooding advisor, JBA, raised no objection to the proposed
development subject to conditions being imposed on permission granted requiring
full details of a land drainage design to be submitted with any detailed application. 
Similarly, should permission be granted, a condition will be imposed requiring the
submission of details of programme of works for the eradication of Japanese
Knotweed on the site to be submitted with any detailed application.   
Consultation responses are published in full on the planning application file and are
available to view via the Public Access section of the Council’s website. 
(D) HISTORY:   
18/02720/PPP
Site for proposed residential development – Granted: 04/07/19 
17/02815/PPP 
Site for proposed residential development – Withdrawn: 23/05/18 
08/02088/OUT
Proposed site for housing development – Granted: 29/03/10 
11/01452/PP 
Formation of access track – Granted: 25/11/11 
12/02210/PP
Variation of Condition 1 relative to outline planning permission reference
08/02088/OUT (proposed site for housing development) - extension of time period
to allow a further period of three years to submit approval of matters specified by
condition – Granted: 22/11/12 
(E) PUBLICITY:   
The proposal has been advertised in terms of Regulation 20 and Neighbour
Notification procedures, overall closing date 13/04/23. 
(F) REPRESENTATIONS:   
(i) Representations received from: 
At the time of writing 77 objections from 66 households and one representation had
been received to the proposed development. 
The names and addresses of those contributing to the application are contained
within Appendix B of this report with full copies of the representations published on
the planning application file available to view via the Public Access section of the
Council’s website. 
(ii) Summary of issues raised:

Page 4

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
• Traffic and Access Issues 
The traffic and access impacts resulting from development of the site require to
be fully considered through a Traffic Impact Assessment. 
Access to the site from Lonan Drive is limited and cannot be widened without
compromising the stability of the steep rock face.  Is it possible to provide a 5.5
metre road with 2 metre paving either side and, in addition, retain the core path
at this narrow entrance point. 
The proposed access will impact adversely on the driveway serving 25 Lonan
Drive which opens out onto the proposed access route. 
The proposed development will generate significant additional vehicles entering
an already overcrowded and congested road network having implications for
emergency service vehicles. 
The proposed development has insufficient parking provision which will inevitably
result in overspill parking and congestion on Lonan Drive. 
Pedestrian crossing points, speed control and parking arrangements should be
addressed. 
The proposed traffic calming measures are inappropriate and dangerous. 
The conditions proposed by the Roads Authority would not provide sufficient
assurance that emergency vehicles could properly access the development
unhindered by competing traffic in the give/take section of the proposed
development.   
A fire evacuation strategy should be submitted with the application which should
include resident escape routes in the event of a wildfire occurring on the hillside
or a fire(s) within the residential development.   
Comment:   The Roads Authority was consulted on the proposed development
and raised no objection on road or pedestrian safety grounds subject to a number
of conditions being imposed on the grant of permission.  The comments from the
Roads Authority are set out in full in the assessment of the application within
Appendix A of this report. 
Access to the development for emergency services, specifically the fire and
rescue service, is addressed under the Building Standards Technical Handbook
and would be a matter for assessment as part of a Building Warrant submission
for the development. 
• Impact on Existing Infrastructure 
The existing water and drainage system is not suitable for further development. 
The existing Scottish Water infrastructure within the site would limit either road,
or housing development within the site. 
Comment:  Scottish Water was consulted on the proposal and in their response
raised no objection advising that the proposed development would be serviced

Page 5

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
by the Tullich Water Treatment Works and the Oban Waste Water Treatment
Works.  Scottish Water do however advise that this does not confirm that the
proposed development can currently be serviced and advise that further
investigations will be required once formal applications for connection are
submitted to them for consideration.   
Scottish Water further advised that the proposed development impacts on
existing Scottish Water assets and the applicant should be aware that any conflict
with assets identified may be subject to restrictions on proximity of construction. 
An informative to this effect will be attached to the grant of any permission. 
During the processing of the previous application the applicant intimated that they
were aware of Scottish Waters existing infrastructure within the site and it has
always been understood this will need to be diverted as part of construction
works, discussions on which have previously been undertaken with Scottish
Water at a local level.   
• Surface Water Drainage Issues/Flooding 
The drainage issues are unsatisfactory.  Events of flooding in Lochavullin,
Glenshellach and Millpark show the inadequacy of the existing drainage
infrastructure which will be exacerbated by the proposed development. 
The application should provide SuDS as part of the application to show that the
effects of the proposed development will be acceptable. 
Failure to address this issue prior to permission being granted means that it
cannot be scrutinised by the public which, in terms of transparency, is
unacceptable. 
Comment:  In their response to the application, the Council’s Flooding Advisors,
JBA, raised no objection to the proposal in principle subject to a condition being
imposed on the grant of permission to secure a detailed drainage assessment at
full planning stage and a requirement for the surface water drainage system to
be designed in accordance with CIRIA C753 and Sewers for Scotland 4th Edition. 
Such details will require to form part of any detailed proposals for the site and will
be reviewed and agreed by JBA in advance of any detailed permission being
granted.   
• Loss of Open Green Space 
The site is the only accessible recreation ground in the area and is an area of
considerable amenity to locals being used primarily for recreation and access by
children, pedestrians and dog walkers and the local school as an outdoor
classroom. 
The site is the only such amenity for the hundreds of residents of the surrounding
area providing a safe opportunity for outdoor recreation. 
The development of the site with housing will result in the loss of the only
accessible area of natural greenery in the surrounding area which would have a
significant impact on the life quality of many residents.

Page 6

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
The argument for retaining this area as a wild woodland suitable for recreation
have been set out in the numerous objections to previous applications for the
development of the site and for this current application. 
During Covid this was the only open space were people could get fresh air and
exercise in safety. 
There will be no natural areas for recreation left within this part of Oban if the
proposed development takes place. 
Comment:  The site is within private ownership and lies within the defined
settlement boundary for Oban as defined in the adopted and emerging Local
Development Plan where there is a general presumption in favour of appropriate
forms of development.   
It should be noted that the elevated land adjacent to, but outwith, the application
site has been designated as an Open Space Protection Area in pLDP2 where
development will not be permitted. 
• Review the Classification of the Site 
Is it not possible to review the classification of the glen which, after all, provides
a beneficial amenity for people and a necessary natural habitat for wildlife. 
Comment:  As detailed in the assessment of the application in Appendix A, the
area of elevated land, outwith the application site, but within the ownership of the
applicant, has been identified as an Open Space Protection Area in pLDP2. 
Any further reclassification of land, including the application site, would require
engagement with the proposed Local Development Plan 3 process. 
• Impact on Trees and Wildlife 
The proposed development would have an adverse impact on a wild variety of
trees which provide shelter and food for many bird species and provide a habitat
for bats and red squirrels.  Bat and red squirrel surveys are considered
necessary. 
The trees on the steep slopes provide stability, prevent landslip and afford
protection for the properties above.  A detailed tree survey is recommended to
ensure both in the interest of amenity and geological integrity that any approved
development retains sufficient area of mature trees. 
Comment:  The Council’s BDO was consulted on the proposal noting that the
proposal represented renewal of a previous permission.  The BDO raised no
objection to the proposed development subject to conditions requiring a number
of surveys to be submitted with any future detailed application(s) being imposed
on the grant of permission to secure the submission of survey and management
information when any detailed planning application(s) for the site is submitted. 
Such surveys include species surveys for Bats (EPS) and Red Squirrel; Peat
Management Plan; Tree Survey which should be undertaken prior to drafting the
design plan for the placement of dwellings, gardens, verges, access, routes and
services; and finally a Japanese Knotweed Eradication Plan.  Such details will
require to form part of any detailed proposals for the site and will be reviewed by

Page 7

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
the Council’s Biodiversity Officer in advance of any detailed permission being
granted.   
• Japanese Knotweed 
Japanese Knotweed has established itself within the site and spread extensively. 
This plant is highly invasive, presenting a problem not only for native wildlife but
also for the built environment and relating infrastructure.  Once established it is
difficult to control and eradicate and can take several years. 
Neighbours of the site area anxious of its spread. 
Comment:  As detailed above, the Council’s BDO has highlighted the presence
of Japanese Knotweed on the site and therefore it is proposed to impose a
condition seeking a programme of works for its eradication.   Such details will
require to form part of any detailed proposals for the development of the site and
will be reviewed by the Council’s BDO in advance of any detailed permission
being granted. 
• Core Path 
The core path should be preserved as an integral asset to the natural
environment and the communities wellbeing. 
The removal of the woodland path and pedestrian having to use the proposed
internal road will not be safe. 
Comment:  The site presently provides informal access through the site with a
formal link with Feochan Gardens.  The application shows the proposed access
linking in to the path at Feochan Gardens retaining access through the site with
the indicative plans showing that development can be achieved which protects
the integrity of the path.  During the processing of the original application, the
Council’s Access Officer raised no concerns regarding the Core Path following
the proposed road but advised that any closure during the construction period
should be kept to a minimum the details of which will require to be agreed in
advance with him.  A condition is proposed on the grant of permission requiring
full details of the works to retain the Core Path within the development to be
submitted as part of any future detailed planning application(s). 
With regards to pedestrian safety at the proposed access into the site, the Roads
Authority has raised no objection on this issue. 
• Suitability and Stability of the Site for Development 
Whilst it is noted that there is a need for housing in Oban, there is also an
obligation to provide housing in a reasonable environment.  The site is
surrounded almost totally by elevated ground and is the drainage area for what
in effect is a canyon. 
There is limited direct sunlight in all but the height of summer and, even then,
only for a short period during the day.  The houses will be dark and in damp
surrounding with the potential for internal dampness being generated.  This is not
healthy.

Page 8

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
The site is a former quarry which would have been exposed to dynamite blasting
consequently damaging the geology on both steeply sloped sides of the site.   
Many of the neighbouring properties are built on the top of a steep slope with
some properties ground extending to the edge of the verge.  Owners have
witnessed signs of instability/slippage in certain areas and these slopes could be
undermined by building works impacting adversely on existing properties. 
The vibration from vehicles using the development will destabilise the cliff face
posing a danger to vehicles and pedestrians. 
A geotechnical site investigation and safety audit should be undertaken to
establish the stability along the length of each bank. 
Comment:   Ground stability is a matter for good development practise and is
regulated by the Council’s Building Standards Unit.   
• Layout and Appearance 
The site is adjacent to parts of Nant Drive, Etive Gardens, Creran Gardens and
Loan Drive which predominantly comprise of detached and semi-detached
bungalows many set within spacious plots with front and rear gardens with some
having garages and outbuildings.   
The indicative layout of 44 units is considered to be too great for the site and at
odds with the current local built environment. 
Any development should be of similar design, layout, visual appearance and
finishing materials to the surrounding residential development. 
It is difficult to envisage how this site would accommodate single storey houses
with gardens, parking spaces, a main road with paving either side and a core
path. 
Comment:  The site is within the Main Town of Oban in an area where there is
a mix of densities and styles of developments.  Whilst it is accepted that the
development to the west is lower density than proposed in the current application,
to the north is the former Local Authority development of Soroba which is a much
denser development incorporating numerous blocks of flatted development. 
However, as is stated above, this application is not for any specified number,
layout or design at this stage but for planning permission in principle to establish
the principle of the development.  Whilst the indicative plan demonstrates to the
satisfaction of the Planning Authority that the site is capable of accommodating
residential development, the specific detail of that development must be properly
assessed through a subsequent future planning application(s) which will include
the mix and layout of development which will be fully assessed against the
relevant policies and guidance of the Development Plan to ensure that no
adverse visual impact or privacy or amenity issues arise.  Third parties will have
the opportunity to comment on the detailed proposals. 
• Noise and Vibration Issues 
The geography of the glen amplifies sound.

Page 9

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Noise from construction works will be extremely disruptive. 
Once completed, noise and vibration from vehicles using the development will be
disruptive and noisy to neighbouring properties. 
Comment:  Construction noise is not a material planning consideration.  Should
noise from construction become a significant issue, this would be a matter for the
Council’s Environmental Health Unit.  With regards to traffic noise to and from the
proposed development once completed, and the use of the development itself, it
is not considered this would be a significant issue given that the site is within the
main town of Oban adjacent to a large housing development where traffic noise
already exists. 
• Unauthorised Site Works 
Works within the site have taken place with the ground levels altered, a gully
pump installed and a watercourse filled in. 
Comment:  As a result of submission from third parties, the Councils Planning
and Enforcement Officer has reviewed the works undertaken on site with no
breach having been identified. 
• Availability of Other Sites 
Alternative sites for development of additional social housing are available and
under development to the north of Oban and offer far more suitable development
opportunities than this controversial site. 
Comment:  This is not a material consideration in the determination of this
planning application.  The Planning Authority has to assess any application
presented to them in terms of the provisions of the Development Plan in force at
the time. 
• Insufficient Information Submitted 
The applicants justifications for proposing that important material considerations
are deferred until the detailed planning stage is not acceptable. 
Details with regards to drainage, waste, Japanese knotweed, biodiversity should
be submitted and considered under the current application. 
Comment: The purpose of this application is to establish the principle of a
residential development, which has previously been accepted by the Planning
Authority and Members of the Planning, Protective Services and Licensing
Committee.  Matters of layout and design will be addressed by way of future
application(s) for approval of matters specified in conditions. 
Notwithstanding this, the application has been accompanied by an indicative plan
which demonstrates to the satisfaction of the Planning Authority that the site is
capable of accommodating residential development. 
Furthermore, no objections have been received from consultees with regards to
servicing and infrastructure arrangements to serve the proposed development.

Page 10

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
• Non-Compliance with Policy / Outcome of Local Development Plan 2 
The proposal is contrary to a number of Local Plan and NPF4 Policies. 
The response to the Planning Authority’s request for a statement on the relevant
NPF4 Policies is lacking and not acceptable. 
Determination of the application should be postponed until the outcome of pLDP2
is known. 
Comment:  The proposed development is fully assessed against the relevant
LDP and NPF4 Policies in the assessment of the application in Appendix A of this
report. 
Proposed LDP2, as recommended to be modified by the Examination Report, is
now a significant material consideration in planning applications. 
• Oban and District Access Panel 
There is no Supporting Statement giving a context for the projection of an
Access/Design Statement giving a design or layout philosophy.  The Panel has
no comments on the planning merits of the proposed development but, if it is to
proceed, would ask that, in line with draft Scottish Government Policy, at least
10% of the units should be founded on Inclusive Design principles and be
accessible to all. 
Comment:  These comments are noted and will be passed to the Applicant by
way of an informative on the grant of permission.   
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report: ☐Yes ☒No 
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations
1994:   
☐Yes ☒No 
(iii) A Design or Design/Access statement:    ☐Yes ☒No 
(iv) A report on the impact of the proposed
development e.g. Retail impact, transport
impact, noise impact, flood risk, drainage
impact etc:  
☐Yes ☒No 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   ☐Yes ☒No

Page 11

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  ☐Yes ☒No 
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account
in assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 6 – Forestry, Woodland and Trees
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings (includes
provisions relevant to Greenfield Sites)
NPF4 Policy 12 – Zero Waste
NPF4 Policy 13 – Sustainable Transport 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 15 – Local Living and 20 Minute Neighbourhoods
NPF4 Policy 16 – Quality Homes
NPF4 Policy 18 – Infrastructure First
NPF4 Policy 21 – Play, Recreation and Support
NPF4 Policy 22 – Flood Risk and Water Management 
‘Argyll and Bute Local Development Plan’ Adopted March 2015 
LDP STRAT 1 – Sustainable Development 
LDP DM 1 – Development within the Development Management Zones 
LDP 3 – Supporting the Protection Conservation and Enhancement of our
Environment 
LDP 8 – Supporting the Strength of our Communities 
LDP 9 – Development Setting, Layout and Design 
LDP 10 – Maximising our Resources and Reducing our Consumption 
LDP 11 – Improving our Connectivity and Infrastructure 
‘Supplementary Guidance to the Argyll and Bute Local Plan 2015’ (Adopted
March 2016 & December 2016) 
Natural Environment 
SG LDP ENV 1 – Impact on Habitats, Species and our Biodiversity
SG LDP ENV 6 – Impact on Trees / Woodland
SG LDP ENV 8 – Green Networks 
Landscape and Design

Page 12

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
SG LDP ENV 14 – Landscape 
General Housing Development 
SG LDP HOU 1 – General Housing Development Including Affordable Housing
Provision
SG LDP HOU 2 – Special Needs Provision in Housing Developments 
Housing Greenspace 
SG LDP HOU 3 – Housing Green-Space 
Sport, Leisure, Recreation and Open Space 
SG LDP REC/COM 2 – Safeguarding Sports Fields, Recreation Areas and Open
Space Protection Areas (OSPAs) 
Sustainable Siting and Design 
SG LDP Sustainable – Sustainable Siting and Design Principles 
Resources and Consumption 
SG LDP SERV 2 – Incorporation of Natural Features / SuDS
SG LDP SERV 5(b) – Provision of Waste Storage & Collection Facilities within New
Development 
Transport (Including Core Paths) 
SG LDP TRAN 1 – Access to the Outdoors
SG LDP TRAN 2 – Development and Public Transport Accessibility
SG LDP TRAN 4 – New & Existing, Public Roads & Private Access Regimes
SG LDP TRAN 6 – Vehicle Parking Provision
SG LDP TRAN 7 – Safeguarding of Airports 
(ii)  List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
• Third Party Representations
• Consultation Reponses
• Planning History
• ABC Technical Note – Biodiversity (Feb 2017)
• ABC draft Technical Note – Argyll and Bute Windows (April 2018)
• ABC Housing Needs and Demand Assessment
• ABC Housing Emergency Statement  
Argyll and Bute proposed Local Development Plan 2 (November 2019) – The
Examination by Scottish Government Reporters to the Argyll and Bute Local
Development Plan 2 has now concluded and the Examination Report has been
published (13th June 2023). The Examination Report is a material consideration of
significant weight and may be used as such until the conclusion of the LDP2
Adoption Process. Consequently, the Proposed Local Development Plan 2 as

Page 13

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
recommended to be modified by the Examination Report and the published Non
Notifiable Modifications is a material consideration in the determination of all
planning and related applications. 
Spatial and Settlement Strategy 
Policy 01 – Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places 
Policy 05 – Design and Placemaking
Policy 06 – Green Infrastructure
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development 
Connected Places 
Policy 32 – Active Travel
Policy 33 – Public Transport Policy 34 – Electric Vehicle Charging Points
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 36 – New Private Accesses
Policy 37 – Development Utilising an Existing Private Access or Existing Private
Road
Policy 39 – Construction Standards for Private Accesses
Policy 40 – Vehicle Parking Provision
Policy 43 – Safeguarding of Aerodromes 
Sustainable Communities 
Policy 61 – Sustainable Urban Drainage Systems (SUDS)
Policy 63 – Waste Related Development and Waste Management 
Homes for People 
Policy 67 – Provision of Housing to Meet Local Needs Including Affordable Housing
Policy 68 – Housing Greenspace 
High Quality Environment 
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 77 – Forestry, Woodland and Trees
Policy 81 – Open Space Protection Areas 
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  ☐Yes ☒No 
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  ☐Yes ☒No

Page 14

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
(M) Has a Sustainability Checklist been submitted:  ☐Yes ☒No 
(N) Does the Council have an interest in the site:  ☐Yes ☒No 
(O) Requirement for a pre-determination hearing: ☐Yes ☒No 
In deciding whether to hold a discretionary hearing, Members should consider: 
• How up to date the Development Plan is, the relevance of the policies to the
proposed development, and whether the representations are on development
plan policy grounds which have recently been considered through the
development plan process. 
• The degree of local interest and controversy on material considerations,
together with the relative size of community affected, set against the relative
number of representations and their provenance. 
The application has been the subject of 77 objections from 66 households, one
representation and an objection from the Oban Community Council. 
Whilst the public interest in the application is noted, the site the subject of the
application has been the subject of a previous PPP, reference 18/02720/PPP, for the
same development.  Whilst the previous PPP expired on 31/03/23, it is considered
to represent a material consideration in the current application which was submitted
and validated within the lifetime of the previous permission. 
The previous application was the subject of a discretionary local hearing which
resulted in the application being determined with a recommendation of approval. 
Since the previous permission was granted, there has been no change in the main
policy background within this area and there have been no material changes in
circumstances in the locality or in the previously approved access or servicing
arrangements which would preclude the renewal of the previous permission. 
Whilst pLDP 2 has not yet been adopted, it is noted that the site the subject of the
application will remain within the defined ‘Settlement’ where Policy 01 gives general
encouragement to development provided that there is no unacceptable
environmental, servicing or access impact and subject to compliance with other
relevant policies and guidance.   
Accordingly, in this instance, as the circumstances of the site, infrastructure and
planning policy have not changed since the previous permission was granted, it is
not considered that a further local hearing would add any value to the planning
process.    
(P)(i) Key Constraints/Designations Affected by the Development: 
•  N/A 
(P)(ii) Soils
Agricultural Land Classification: Unclassified Land

Page 15

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Peatland/Carbon Rich Soils Classification: ☐Class 1
☐Class 2
☐Class 3
☒N/A
Peat Depth Classification: N/A  
Does the development relate to croft land? ☐Yes ☒No
Would the development restrict access to croft
or better quality agricultural land?
☐Yes ☐No ☒N/A
Would the development result in
fragmentation of croft / better quality
agricultural land?
☐Yes ☐No ☒N/A 
(P)(iii) Woodland  
Will the proposal result in loss of
trees/woodland?
(If yes, detail in summary assessment)
☒Yes
☐No 
Does the proposal include any replacement or
compensatory planting?
☐Yes 
☒No details to be secured by condition
☐N/A  
(P)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application
(tick all relevant boxes)
☐Brownfield
☐Brownfield Reclaimed by Nature
☒Greenfield 
ABC LDP 2015 Settlement Strategy 
LDP DM 1 (tick all relevant boxes) 
☒Main Town Settlement Area
☐Key Rural Settlement Area
☐Village/Minor Settlement Area
☐Rural Opportunity Area
☐Countryside Zone
☐Very Sensitive Countryside Zone
☐Greenbelt
ABC pLDP2 Settlement Strategy
(tick all relevant boxes) 
☒Settlement Area
☐Countryside Area
☐Remote Countryside Area
☐Helensburgh & Lomond Greenbelt
ABC LDP 2015 Allocations/PDAs/AFAs
etc: 
N/A
ABC pLDP2 Allocations/PDAs/AFAs
etc: 
N/A 
(P)(v) Summary assessment and summary of determining issues and material
considerations 
The principle of the development on this site has been established by the granting of
PPP reference 18/02720/PPP. 
Whilst the previous PPP expired on 31/03/23, it is considered to represent a material
consideration in the current application which was submitted and validated within the
lifetime of the previous permission and which effectively seeks to renew the original

Page 16

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
PPP. 
The application is seeking to secure PPP for a residential development on an area
of land at Lonan Drive, Oban.   
Whilst only seeking to establish the principle of development, an indicative layout has
been submitted in support of the application showing a layout for 44 units.  The
indicative layout shows a mix of flats and semi-detached dwellinghouses in 12 blocks
situated either side of the proposed access road with an area of casual play space
to the south and an equipped play space to the north of the proposed residential
units.  The indicative layout has been arranged in such a way to avoid the steeply
sloping tree covered hillside running along the western edge of the site. 
Notwithstanding the above, it should be noted that this is an application for PPP only
seeking the approval for the residential development of the land subject of this
planning application and not for any specified number, layout or form of dwellings. 
The submitted plan is solely for indicative purposes.  Whilst this indicative plan
illustrates a possible development of 44 dwellings, this does not mean that the site
is necessarily capable of being developed at that density.  The purpose of the
indicative plan is simply to demonstrate, to the satisfaction of the Planning Authority,
that the site is capable of accommodating residential development to an appropriate
standard and generally in accordance with the provision of the LDP.   
Vehicular access to serve the site is by extension of Lonan Drive with water supply
and drainage via connection to the public systems within the control of Scottish
Water. 
No adverse comments have been received from consultees with regards to the
proposed access and infrastructure arrangements to serve the proposed
development. 
The application has been the subject of 77 objections from 66 households, one
representation and an objection from the Oban Community Council. 
The proposal is considered consistent with the terms of National and Local Planning
Policy and it is recommended that permission be approved subject to conditions.   
A full report is provided in Appendix A. 
(Q) Is the proposal consistent with the Development Plan: ☒Yes ☐No 
(R) Reasons why Planning Permission in Principle Should be Granted: 
The proposal is considered to be consistent with the relevant provisions of the
Development Plan and National Planning Framework 4 and there are no other
material considerations of sufficient significance, including issues raised by
third parties, to indicate that it would be appropriate to withhold planning
permission having regard to Section 25 of the Act. 
(S) Reasoned justification for a departure to the provisions of the Development
Plan

Page 17

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
N/A 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
☐Yes ☒No 
Author of Report: Fiona Scott  Date: 29/11/23 
Reviewing Officer: Peter Bain Date: 08.12.2023 
Fergus Murray
Head of Development & Economic Growth

Page 18

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 23/00376/PPP 
Standard Time Limit Condition  (as defined by Regulation) 
Additional Conditions 
1. PPP – Matters Requiring AMSC Submission 
Plans and particulars of the matters specified in conditions 3, 4, 5, 6, 7, 8, 9, 10, 11,
12, 13, 14 and 15 below shall be submitted by way of application(s) for Approval of
Matters Specified in Conditions in accordance with the timescales and other limitations
in Section 59 of the Town and Country Planning (Scotland) Act 1997 as amended.
Thereafter the development shall be completed wholly in accordance with the
approved details. 
Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act
1997 as amended. 
Note to Applicant 
Regard should be had to Scottish Waters consultation comments and the Oban and
District Access Panels comments in relation to the proposed development, details of
which are available to view via the Public Access section of the Council’s website.  
2. PPP – Approved Details 
The development shall be implemented in accordance with the details specified on the
original application form dated 18/12/18 and the previously approved drawings listed
in the table below. 
Plan Title. Plan Ref. No. Version Date Received
Site and Location Plan  1441 01  b 09/03/23
Indicative Site Plan & Site
Sections 
1440 L(--)01 g 09/03/23
Site Sections  1440 L(--)02 a 09/03/23
Road Layout at Lonan Drive  601775-DRG-0001-
P1 
09/03/23
Road Details at Lonan Drive  601775-DRG-0002-
P1 
09/03/23 
Reason:  To accord with Regulation 28 of the Town and Country Planning
(Development Management Procedure) (Scotland) Regulations 2008.  
3. PPP – Timescale to be Agreed for Completion 
Pursuant to Condition 1 - no development shall commence until details of the proposed
timescale for completion of the approved development have been submitted to and
approved by the Planning Authority. Thereafter, the development shall be
implemented in accordance with the duly approved timescale for completion unless an
alternative timescale for completion is otherwise agreed in writing with the Planning
Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F.

Page 19

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
4. PPP – Roads and Access 
Pursuant to Condition 1 – no development shall commence until details of the
proposed service road and connection with the existing public road have been
submitted to and approved by the Planning Authority. Such details shall incorporate: 
i) A vehicular access layout providing a Road over which the public has a right
of access in terms of the Roads (Scotland) Act 1984; 
ii) A turning head for the public service vehicle; 
iii) Details of the priority signage for the access into the site. 
Prior to work starting on site, the junction with the existing public road shall be fully
formed and surfaced with all access roads and footways granted consent constructed
to at least base course level prior to any work starting on the erection of the buildings
which they are intended to serve and the final wearing surface of the roads and
footways shall be applied concurrently with the construction of the final building. 
Reason: In the interests of road safety and to ensure the timely provision of a service
road commensurate to the scale of the overall development and having regard to the
status of the proposed access as a residential service road. 
Note to Applicant: 
Road Construction Consent under the Roads (Scotland) Act 1984 must be obtained
from the Council’s Roads Engineers and a Road Bond provided prior to the formation
of the access within the development site.  
5. PPP – Parking Provision 
Pursuant to Condition 1 – no development shall be commenced in respect of any
individual building until plans and particulars of the means of parking/turning
arrangements to serve that building have been submitted to and approved by the
Planning Authority. Such details shall incorporate:   
i) The provision of parking and turning in accordance with the requirements of
Supplementary Guidance SG LDP TRAN 6 of the adopted ‘Argyll and Bute
Local Development Plan’ 2015. 
The approved parking and turning layout to serve the buildings shall be implemented
in full prior to that building first being occupied and shall thereafter be maintained clear
of obstruction for the parking and manoeuvring of vehicles. 
Reason: In the interests of road safety.  
6.  PPP – Sustainable Drainage System 
Pursuant to Condition 1, no development shall commence on site until full details, in
plan form, of the land drainage design for the site and details of its ongoing
maintenance has been submitted to and approved in writing by the Planning Authority. 
Such details shall show a drainage system designed in accordance with CIRIA C753
and Sewers for Scotland 4th Edition. 
Reason:  In order to safeguard the development from the possibility of flooding.

Page 20

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Note to Applicant 
Regard should be had to JBA Consulting Ltd consultation comments in relation to the
proposed development, details of which is available to view via the Public Access
section of the Council’s website.  
7. PPP – Design and Finishes 
Pursuant to Condition 1 – no development shall commence in respect of any individual
building until plans and particulars of the site layout, open space, design and external
finishes of the development have been submitted to and approved by the Planning
Authority. These details shall incorporate: 
i) A Design Statement in accordance with the advice set out in Planning
Advice Note 68 which shall establish the design principles applicable
to the layout of the development as a whole and design of the individual
dwellings. 
ii) A statement addressing how the proposed development has been
designed to be consistent with the six qualities of successful places, as
defined within NPF4 Policy 14;
iii) A statement addressing the Action Checklist for developing design
contained within the Argyll and Bute Sustainable Design Guide 2006;
iv) Local vernacular design. 
Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act
1997 as amended, and in order to integrate the proposed dwellinghouse with its
surrounds.  
8. PPP – Landscaping  
Pursuant to Condition 1 – no development shall commence until a scheme of
boundary treatment, surface treatment and landscaping has been submitted to and
approved by the Planning Authority. The scheme shall comprise a planting plan and
schedule which shall include details of: 
i) Existing and proposed ground levels in relation to an identified fixed
datum;
ii) Existing landscaping features and vegetation to be retained;
iii) Location design and materials of proposed walls, fences and gates;
iv) Proposed soft and hard landscaping works including the location,
species and size of every tree/shrub to be planted;
v) A biodiversity statement demonstrating how the proposal will contribute
to conservation/restoration/enhancement of biodiversity and how these
benefits will be maintained for the lifetime of the development;
vi) A programme for the timing, method of implementation, completion and
subsequent on-going maintenance; 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme unless otherwise approved in writing by the Planning Authority. 
Any trees/shrubs which within a period of five years from the completion of the
approved landscaping scheme fail to become established, die, become seriously

Page 21

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
diseased, or are removed or damaged shall be replaced in the following planting
season with equivalent numbers, sizes and species as those originally required to be
planted unless otherwise approved in writing by the Planning Authority. 
All physical biodiversity enhancement measures (bird nesting boxes, ‘swift bricks’,
wildlife ponds, bat and insect boxes, hedgehog homes etc.) shall be implemented in
full before the development hereby approved is first brought into use. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being brought
into use. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate. 
Reason:  To assist with the integration of the proposal with its surroundings in the
interests of amenity.  
9. PPP – Tree Retention and Protection 
Pursuant to Condition 1 – no development shall commence until a scheme for the
retention and safeguarding of trees during construction has been submitted to and
approved by the Planning Authority. The scheme shall comprise: 
i) A survey of trees on and overhanging the site indicating the location,
species, height, canopy spread and condition of each tree;
ii) An assessment of the amenity and nature conservation value of tree
groups and individual trees which shall inform the layout of the
development proposed;
iii) Details of all trees to be removed and the location and canopy spread
of trees to be retained as part of the development;
iv) A programme of measures for the protection of trees during
construction works which shall include fencing at least one metre
beyond the canopy spread of each tree in accordance with BS
5837:2012 “Trees in Relation to Design, Demolition and Construction”. 
The tree survey should be undertaken prior to drafting the design plan for the
placement of dwellings, verges, access routes and services. 
Tree protection measures shall be implemented for the full duration of construction
works in accordance with the duly approved scheme. No trees shall be lopped, topped
or felled other than in accordance with the details of the approved scheme unless
otherwise approved in writing by the Planning Authority. 
Reason: In order to retain trees as part of the development in the interests of amenity
and nature conservation  
10. PPP – Japanese Knotweed Eradication Scheme 
Pursuant to Condition 1 – no development shall commence on site until full details of
a scheme for the eradication of Japanese Knotweed has been submitted to and
approved in writing by the Planning Authority in consultation with the Biodiversity
Officer.  The scheme shall include a timetable for implementation and clearly identify
the extent of the Japanese Knotweed on a scaled plan.  Prior to construction works

Page 22

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
commencing on site the approved scheme and timetable shall be implemented in full
and a validation report confirming details of the remediation treatment carried out and
confirmation that the site is free of Japanese Knotweed shall be submitted to the
Planning Authority. 
Reason:  To eradicate Japanese Knotweed from the development site and to prevent
the spread of this non-invasive species through development works.  
11. PPP – Affordable Housing 
Pursuant to Condition 1 - no development shall commence until a scheme for the
provision of affordable housing (as defined below) has been submitted to and
approved by the Planning Authority. The scheme shall: 
a) Provide that a minimum of 25% of the approved dwellings are affordable
homes; 
b) Define those properties to be used as affordable homes;
c) Establish the timing of their provision relative to the phasing of the
development, which shall ensure that the last 25% of the dwellings within the
development are not commenced until the affordable housing phase has been
completed for occupation;
d) Establish the arrangements to ensure the affordability of the affordable homes
for both initial and subsequent occupiers (including any discount rate
applicable in terms of (ii) below); 
For the purposes of this condition ‘affordable homes’ are defined as being either: 
i) Social housing (rented or shared ownership or shared equity) managed by a
registered social landlord (a body registered under part 3 chapter 1 of the
Housing (Scotland) Act 2001, or any equivalent provision in the event of the
revocation and re-enactment thereof, with or without modification);
ii) Discounted low cost sale housing (subject to a burden under the Title
Conditions (Scotland) Act 2003), or any equivalent provision in the event of the
revocation and re-enactment thereof, with or without modification).
iii) Housing for sale or rent without subsidy, which is designed to be affordable
and to meet the housing needs of the majority of those households identified
as in housing need in the Local Housing Strategy or Housing Market Study i.e.
one or two person households on average income, with conditions attached to
their missives to prevent further extension, thereby helping to ensure that they
are likely to remain affordable to subsequent purchasers. 
The development shall be implemented and occupied thereafter in accordance with
the duly approved scheme for affordable housing. 
Reason:  To accord with the provisions of the Development Plan in respect of
affordable housing provision.  
12. PPP – Ecological Surveys 
Pursuant to Condition 1 - no development shall commence until full details of a Bat
Survey and Red Squirrel Survey have been submitted to and approved in writing by
the Planning Authority in Consultation with the Biodiversity Officer.  Such details shall
include when the surveys are to be carried out, the methodology to be employed in
both surveys and any mitigation measures, including a timetable for the
implementation of mitigation measures.

Page 23

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Reason:  To prevent the disturbance of Protected Species. 
Note to Applicant 
Regard should be had to the Council’s Biodiversity Officers consultation comments in
relation to the proposed development, details of which is available to view via the
Public Access section of the Council’s website.  
13. PPP – Peat Survey 
Pursuant to Condition 1- no development shall commence until full details of a Peat
Survey and Management Plan has been submitted to and approved in writing by the
Planning Authority in consultation with the Biodiversity Officer.  Such details shall
provide details of the depth of the peat deposit on site. 
Reason: In order to protect natural heritage assets. 
Note to Applicant: 
Should the survey determine the depth of peat to be in excess of 0.5 metres the
applicant will require to liaise with SEPA for advice on management. 
Regard should be had to the Council’s Biodiversity Officers consultation comments in
relation to the proposed development, details of which is available to view via the
Public Access section of the Council’s website.  
14. PPP – Open Space/Play Areas 
Pursuant to Condition 1 – no development shall commence until details for the
provision and maintenance of proposed areas of communal open space and equipped
play area(s) within the development have been submitted to and approved by the
Planning Authority. The details shall comprise: 
i) A plan showing the location and extent of communal open space and
equipped play areas;
ii) Provision to satisfy the minimum standards set out in the Development
Plan; 6sqm of equipped play space and 12sqm of informal open space per
dwelling unit;
iii) Specification of play equipment to be installed, including surface treatments
and any means of enclosure, designed in accordance with the provisions
of BS5696 (Play Equipment Intended for Permanent Installation Outdoors);
iv) Proposals for the timing of the implementation of the play area(s) in relation
to the phasing of the development;
v) A maintenance schedule for communal open spaces and equipped play
areas in accordance with the provisions of BS5696 including details of on-
going inspection, recording and procedures for detailing with defects. 
The communal open space and equipped play area(s) shall be provided in accordance
with the duly approved details and shall be retained and maintained to the specified
standards thereafter. 
Reason: In order to secure provision of communal open space and equipped play
areas within the development in accordance with the minimum standards set out in
the Development Plan.

Page 24

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
15. PPP – Core Path 
Pursuant to Condition 1 – no development shall commence until details for the
provision of the Core Path through the development site has been submitted to and
approved by the Planning Authority in consultation with the Access Officer. 
The details shall comprise: 
i) The route a minimum width of 2.5 metres wide;
ii) The route finished in a tarmacadam surface;
iii) The route provided with dropped kerbs where it meets the road surface;
iv) Gradients kept to a minimum to ensure the route is accessible for people
of all abilities. 
The route shall be provided in accordance with the duly approved details and
maintained to the specified standards thereafter. 
Reason:  In order to secure the retention of the existing core path in the interests of
amenity 
Note to Applicant: 
The advice contained in the consultation response from the Council’s Access Officer
in relation to application 18/02720/PPP, available to view via the Public Access section
of the Council’s website, should be fully considered in the preparation of the details for
the provision of the Core Path within the development.

Page 25

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION NUMBER:  23/00376/PPP 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. Introduction 
1.1. The proposal the subject of this application is seeking to secure PPP for a residential
housing development. 
The site the subject of the application has been the subject of a previous PPP, reference
18/02720/PPP, for the same development.  Whilst the previous PPP expired on 31/03/23,
it is considered to represent a material consideration in the current application which was
submitted and validated within the lifetime of the previous permission and effectively
seeks to renew the previous PPP. 
As an application for PPP, no detailed layout, design or infrastructure details having been
submitted.  The purpose of this application is to establish the principle of development
with the matters of layout and design to be addressed by way of future application(s) for
approval of matters specified in conditions. 
Whilst only seeking PPP, an indicative layout has been submitted in support of the
application showing a layout for a ‘large scale’ housing development of 44 units. 
Whilst this indicative plan illustrates a possible development of 44 dwellings, this does not
mean that the site is necessarily capable of being developed at that density.  The purpose
of the indicative plan is simply to demonstrate, to the satisfaction of the Planning Authority,
that the site is capable of accommodating residential development to an appropriate
standard and generally in accordance with the provision of the LDP.   
The proposal has elicited 77 objections from 66 households, 1 representation and an
objection from the Oban Community Council. 
2. Location, Nature and Design of Proposed Development 
2.1. The application site is situated within a long established residential area on the periphery
of the Main Town of Oban. 
The site is accessed from the end of Lonan Drive where it is contained within a small glen
bounded along its western boundary by the established residential development of Nant
Drive which is at a significantly higher level.  To the east the site rises steeply upwards
beyond which is the formal Local Authority development of Soroba.  To the north is
Feochan Gardens, a continuation of Nant Drive, and to the south Etive and Creran
Gardens.  Development within the residential areas surrounding the site comprises a
mixture of private semi-detached and detached dwellinghouses which are predominantly
single storey. 
The application proposes to extend Lonan Drive through the glen with the residential
development located within the glen and hillside. 
As detailed above, as the application is only seeking to establish the principle of the
development, no detailed layout, design or infrastructure details have been submitted in
support of the application.  However, given the constraints of the site, together with the

Page 26

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
number of units proposed, an indicative layout has been submitted with the application
showing how the site could be developed.  The indicative layout shows a mix of flats and
semi-detached dwellinghouses in 12 blocks situated either side of the proposed access
road with an area of casual play space to the south and an equipped play space to the
north of the proposed residential units.  The indicative layout has been arranged in such
a way to avoid the steeply sloping tree covered hillside running along the western edge
of the site. 
Notwithstanding the above, it should be noted that this is an application for PPP only.  It
seeks the approval for the residential development of the land subject of this planning
application and not for any specified number, layout or form of dwellings.  The
subsequently submitted plan is solely for indicative purposes only.  Whilst this indicative
plan illustrates a possible development of 44 dwellings, this does not mean that the site
is necessarily capable of being developed at that density.  The purpose of the indicative
plan is simply to demonstrate, to the satisfaction of the Planning Authority, that the site is
capable of accommodating residential development to an appropriate standard and
generally in accordance with the provision of the LDP.   
Through the granting of the previous PPP, the Planning Authority was satisfied that the
indicative plan successfully demonstrated that the site is appropriate for residential
development arranged along a straight, central access road with buildings either side of it
and limited to the ‘valley floor’ without unacceptable encroachment into the steep and
wooded valley sides.  Whilst the indicative plan demonstrates to the satisfaction of the
Planning Authority that the site is capable of accommodating residential development, the
specific detail of that development must be properly assessed through a subsequent future
planning application(s). 
Vehicular access to serve the site is by extension of Lonan Drive with water supply and
drainage via connection to the public systems.  The infrastructure arrangements to serve
the site are discussed in detail in the relevant sections below. 
There has been no change in the circumstances of the site, infrastructure and planning
policy since the previous permission was granted 
3. Settlement Strategy 
3.1. In terms of the Settlement Strategy set out in the adopted ‘Argyll and Bute Local
Development Plan’ 2015 (LDP), the application site is situated within the Main Town of
Oban where Policies LDP STRAT 1 and LDP DM 1 give general encouragement to
development on appropriate sites.  These main policy considerations are underpinned by
the Supplementary Guidance (SG) contained with SG LDP HOU 1 and SG LDP ENV 14
which offer further support to appropriate scales of residential development where such
development would have no significant adverse impact upon the character of the
landscape and where there is no unacceptable environmental, servicing or access impact. 
In order to address the determining issues, the key considerations in this application are: 
3.1.1. Compliance with the Development Plan and other relevant planning policy
3.1.2. Any other material considerations, including the planning history of the site. 
4. Compliance with National Policy

Page 27

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
NPF4 was adopted on 13 February 2023 which now represents the main policy
background against which proposed developments are assessed underpinned by the
Policy and SG contained within the adopted LDP.   
The relevant NPF4 Policies are detailed below and grouped into topic areas. 
4.1. NPF4 Policy 1 – Tackling the Climate and Nature Crises 
NPF4 Policy 1 seeks to prioritise the climate and nature crises in all decisions; it requires
to be applied together with other policies in NPF4. 
Guidance from the Scottish Government advises that it is for the decision maker to
determine whether the significant weight to be applied tips the balance in favour for, or
against a proposal on the basis of its positive or negative contribution to climate and
nature crises.   
4.2. NPF4 Policy 2 – Climate, Mitigation and Adaption 
NPF4 Policy 2 seeks to ensure that new development proposals will be sited to minimise
lifecycle greenhouse gas emissions as far as possible, and that proposals will be sited
and designed to adapt to current and future risks from climate change. 
Guidance from the Scottish Government confirms that at present there is no single
accepted methodology for calculating and / or minimising emissions. The emphasis is on
minimising emissions as far as possible, rather than eliminating emissions. It is noted that
the provisions of the Settlement Strategy set out within Policy LDP DM 1 of the ‘Argyll and
Bute Local Development Plan’ 2015 (LDP) 1 promotes sustainable levels of growth by
steering significant development to our Main Towns and Settlements, rural growth is
supported through identification of Key Rural Settlements and safeguards more sensitive
and vulnerable areas within its various countryside designations. 
4.3. NPF4 Policy 3 – Biodiversity 
NPF4 Policy 3 seeks to protect biodiversity, reverse biodiversity loss and deliver positive
effects from development and strengthen nature networks. 
Whilst the site is not subject of any statutory landscape or nature designations, it is within
an area where there is significant tree cover with third parties raising concerns regarding
the implications of the proposed development on wildlife, particularly squirrels and bats. 
The Council’s Biodiversity Officer was consulted on the proposal and raised no objection
to the proposed development subject to conditions being imposed on the grant of
permission to secure the submission of survey and management information when any
detailed planning application(s) for the site is submitted.  Such surveys include species
surveys for Bats (EPS) and Red Squirrel; Peat Management Plan; Tree Survey which
should be undertaken prior to drafting the design plan for the placement of dwellings,
gardens, verges, access, routes and services; and finally a Japanese Knotweed
Eradication Plan. 
With regards to the need in NPF4 Policy 3 to secure biodiversity improvements, it is not
considered that there are any issues of compliance with Policy 3.  No material biodiversity
impacts have been identified in the assessment of this application by the Planning
Authority.  Furthermore, the Supporting Statement (SS) submitted by the applicant
outlines that detailed arrangements for biodiversity enhancement within the development
will be brought forward concurrently with the design and layout of the housing

Page 28

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
development.  The SS indicates that such biodiversity enhancement measures could
include tree protection measures, new tree planting, native planting and wild flower seed
sowing, provision of bat boxes, use of green roofs where appropriate, formation of
naturalistic SuDS features and retention of felled tree sections.  Accordingly, given that
the application is seeking to establish the principle of the development, it is considered
that adequate and proportionate measures for biodiversity enhancement and protection
can be delivered by a condition imposed on the grant of permission.   
With conditions to secure the requirements of the Biodiversity Office and a
condition to secure adequate and proportionate biodiversity enhancement and
protection measures within the development, the proposal is considered to be
consistent with NPF4 Policy 3 as underpinned by LDP Policies LDP 3 and SG LDP
ENV 1 and Policy 73 of pLDp2. 
4.4. NPF4 Policy 4 – Natural Places 
NPF4 Policy 4 seeks to protect, restore and enhance natural assets making best use of
nature-based solutions. 
The proposed development is not within any designated European site of natural
environment conservation or protection, it is not located within a National Park, a National
Scenic Area a SSSI or RAMSAR site, or a National Nature Reserve. Neither is it located
within a local landscape area or a site designated as a local nature conservation site or
within an area identified as wild land.   
Whilst the site is not within any of the aforementioned designations, it represents an
informal of informal open recreation space within a wider residential development. 
Accordingly, during the processing of the previous application the Planning Authority
negotiated to secure an indicative layout which would have the least impact on this area
of valuable open space.   
The Planning Authority also sought to negotiate the provision of the elevated area of land
within the ownership of the applicant (shown within the site edged blue) adjoining the
application site as an Open Space Protection Area (OSPA) as it was considered that the
provision of this land as an OSPA would add value to the overall development by offsetting
the loss of a substantial area of land which has long been enjoyed as an informal area of
public open space. 
However, this request was rejected by the applicant and therefore the Planning Authority
entered into discussions with the Council’s Development Policy Team (DPT) to
investigate a mechanism for securing this area as an OSPA within the forthcoming
pLDP2. 
The DPT advised that the wider area adjacent to the application site had been assessed
as part of the preparation for pLDP2 as it was considered that the prominent ridge in this
area contributes, at a local level, to both the landscape and townscape structure and
identity of Oban.  On this basis the DPT proposed that the area of elevated land, outwith
the application site but within the ownership of the applicant, be identified as an OSPA in
pLDP2. 
This elevated area of ground is designated within pLDP2 as an OSPA where built
development will not be supported. 
As detailed at NPF4 Policy 13 below, the site presently provides informal access through
the site with a formal link with Feochan Gardens.  However the application shows the

Page 29

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
proposed access linking in to the path at Feochan Gardens retaining access through the
site with the indicative plans showing that development can be achieved which protects
the integrity of the path.   
The proposed development is considered to be consistent with NPF4 Policy 4 as
underpinned by LDP Policies 3, SG LDP ENV 1 and SG LDP ENV 8 and Policies 06
and 73 of pLDP2. 
4.5. NPF4 Policy 6 – Forestry, Woodland and Trees 
NPF4 Policy 6 seeks to protect and expand forests, woodland and trees.   
Whilst the site is within an area where there is significant tree cover, the site is not located
within an area of ancient woodland, nor will it result in the loss of any ancient or veteran
trees.  Notwithstanding this, at the request of the Biodiversity Officer, a condition is
proposed on the grant of permission to secure a tree survey for the site.  Such a survey
will require details of proposed tree felling, tree retention and tree protection measures
for the development. 
With a condition to secure a tree survey for the site, the proposal is considered to
be consistent with NPF4 Policy 6 as underpinned by LDP Policies LDP 3 and SG
LDP ENV 6 and Policy 77 of pLDp2. 
4.6. NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings 
NPF4 Policy 9 seeks to encourage, promote and facilitate the reuse of brownfield, vacant
and derelict land and empty buildings, and to help reduce the need for greenfield
development. 
Part (b) of Policy 9 states that proposals on greenfield sites will not be supported unless
the site has been allocated for development or the proposal is explicitly supported by
policies in the LDP. 
Whilst the site the subject of the application is on a greenfield site, in terms of our adopted
settlement strategy, the site of the proposed residential development is within the Main
Town of Oban where Policies LDP STRAT 1 and LDP DM 1 give general encouragement
to development on appropriate sites.  These main policy considerations are underpinned
by the SG contained with SG LDP HOU 1 and SG LDP ENV 14 which offer further support
to appropriate scales of residential development where such development would have no
significant adverse impact upon the character of the landscape and where there is no
unacceptable environmental, servicing or access impact. 
In terms of pLDP2, the site is identified as being within a ‘Settlement Area’ where Policy
01 gives general support to development provided that it is compatible with surrounding
uses; provides appropriate infrastructure; is of an appropriate scale and fit for the size of
settlement in which it is proposed; and respects the character and appearance of the
surrounding townscape in terms of density, scale, massing, design, external finishes and
access arrangements. 
NPF4 Policy 9 aligns with the settlement strategy of the LDP and emerging pLDP2 and
the current development proposal raises no issue of conflict. 
4.7. NPF4 Policy 12 – Zero Waste

Page 30

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
NPF4 Policy 12 seeks to encourage, promote and facilitate development that is consistent
with the waste hierarchy as defined within the policy document. 
The development the subject of this planning application seeks to establish the principle
of a residential development, with an indicative layout for 44 units shown.  Whilst this is a
development which will generate waste when operational, it will benefit from regular waste
uplifts by the Council and will be expected to comply with our adopted and enforced
recycling and reuse strategy. 
The proposed development aligns with NPF4 Policy 12 as underpinned by LDP
Policies LDP 10 and LDP SERV 5(b) and Policy 63 of pLDP2 and the current
proposal would raise no issue of conflict should permission be granted. 
4.8. NPF4 Policy 13 – Sustainable Transport 
NPF4 13 seeks to encourage, promote and facilitate developments that prioritise walking,
wheeling, cycling and public transport for everyday travel and reduce the need to travel
unsustainably. 
The application proposes to extend Lonan Drive to serve the proposed development.   
This development is not considered to be a significant travel generating use or a proposal
where it is considered important to monitor travel patterns resulting from the development. 
The SS submitted with the application details that the application site is readily accessible
to existing path and public road networks, as well as the existing public bus network.  The
SS details that the site offers opportunities for pedestrian access through the centre which
connects into existing paths at either end and provides improved access to the
undeveloped hillside.  The SS states that EV charging points, cycle storage provision,
pedestrian crossing points, speed control measures, footpath connection and parking
arrangements will be detailed in the future application(s) for the detailed development of
the site.   
In their response to the application the Roads Authority raised no objection to the proposal
or concern in respect of the capacity of the existing road network to accommodate the
development subject to a number of conditions being imposed on any permission granted
including the construction of the internal road which will require to be to adoptable
standard and provision of an appropriate parking and turning area to serve the
development. 
During the processing of the 2017 planning application, which was withdrawn, the Roads
Authority advised that they were minded to refuse permission as there was insufficient
development width at the site access to safely provide a two lane 5.5 metre wide
carriageway with 2 metre footways/verges either side. 
However, whilst the physical circumstances of the site remain the same as the 2017
planning application, during the processing of the 2018 application, which the current
proposal effectively seeks to renew, the Roads Authority advised that the design
addresses and provides an acceptable roads design solution for the section of the
development that cannot achieve a 7.5m road corridor.  It is advised that the roads design
proposed incorporates a traffic calmed area with a width restriction to the carriageway
and give and take vehicular access arrangements (similar to the traffic calming detailed
in S6.6.4(9) of the Roads Development Guide).  The traffic calmed area at the proposed
access has been designed to provide a 3.7 metre wide carriageway with a 2 metre wide

Page 31

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
footway on one side for approximately 25 metres with the carriageway within the proposed
development 5.5 metres wide with 2 metre footways either side. 
The site presently provides informal access through the site with a formal link with
Feochan Gardens.  The application shows the proposed access linking in to the path at
Feochan Gardens retaining access through the site. However, indicative plans show that
development can be achieved which protects the integrity of the path.  Furthermore,
during the processing of the previous application, the Council’s Access Officer raised no
objection to the proposed development provided that the route is retained with any closure
for the minimum possible time period and subject to conditions regarding the Core Path.   
With conditions to secure the requirements of the Roads Authority and the Access
Officer the proposed development aligns with NPF4 Policy 13 as underpinned by
LDP Policies LDP 11, SG LDP TRAN 1, SG LDP TRAN 2, SG LDP TRAN 4 and SG
LDP TRAN 6 and Policies 32, 35, 36, 37, 39 and 40 of pLDP2. 
4.9. NPF4 Policy 14 – Design, Quality and Place 
NPF4 Policy 14 seeks to encourage, promote and facilitate well designed development
that makes successful places by taking a design-led approach and applying the ‘Place
Principle’. 
As detailed above, the application is seeking to establish the principle of a residential
development.  Whilst no specific siting or design has been submitted for assessment by
the Planning Authority, the application is accompanied by an indicative layout of how 44
dwellings could be accommodated within the site.  However, the purpose of the indicative
plan is simply to demonstrate, to the satisfaction of the Planning Authority, that the site is
capable of accommodating residential development to an appropriate standard and
generally in accordance with the provision of the LDP.   
In this instance, whilst the indicative plan demonstrates to the satisfaction of the Planning
Authority that the site is capable of accommodating residential development, the specific
detail of that development must be properly assessed through a subsequent future
planning application(s) which will be expected to comply with the ‘place principle’ as set
out in NPF4 Policy 14 and planning conditions attached to the grant of PPP will ensure
that the development is designed to an appropriate standard.    
The proposed development aligns with NPF4 Policy 14 as underpinned by LDP
Policies LDP 9 and SG LDP Sustainable Siting and Design Principles and Policies
05, 08, 09 and 10 of pLDP2 and the current proposal would raise no issue of conflict
should permission be granted. 
4.10. NPF4 Policy 15 – Local Living and 20 Minute Neighbourhoods 
NPF4 Policy 15 seeks to encourage, promote and facilitate the application of the ‘Place
Principle’ and create connected and compact neighbourhoods where people can meet
the majority of their daily needs within a reasonable distance of their home, preferably by
walking, wheeling or cycling or using sustainable transport options. 
In terms of our adopted settlement strategy, the site of the proposed residential
development is within the Main Town of Oban where Policies LDP STRAT 1 and LDP DM
1 give general encouragement to development on appropriate sites.  These main policy
considerations are underpinned by the SG contained with SG LDP HOU 1 and SG LDP
ENV 14 which offer further support to appropriate scales of residential development where

Page 32

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
such development would have no significant adverse impact upon the character of the
landscape and where there is no unacceptable environmental, servicing or access impact. 
It is considered that the scale of the proposed development, and its location, would
reasonably comply with Policy 15 of NPF4 given the existing geographical scale of the
environment within which the development is to be located, and given its compliance with
the existing settlement pattern and the level and quality of interconnectivity of the
proposed development with the surrounding area where people can reasonably meet the
majority of their daily needs within a reasonable distance of their home. 
The proposed development aligns with NPF4 Policy 15 as underpinned by the
broad settlement strategy policy contained within LDP Policies LDP DM 1, LDP 8,
LDP 10 and LDP 11 of the LDP and Policy 02 of pLDP2 and the current proposal
would raise no issue of conflict should permission be granted. 
NPF4 Policy 16 – Quality Homes 
NPF4 Policy 16 supports development proposals which encourage, promote and facilitate
the delivery of more high quality, affordable and sustainable homes, in the right locations,
providing choice across tenures that meet the diverse housing needs of people and
communities. 
Policy 16(a) supports development proposals for new homes on land allocated for
housing in LDPs.  Whilst the site the subject of the application is on a greenfield site, in
terms of our adopted settlement strategy, the site of the proposed residential development
is within the Main Town of Oban where Policies LDP STRAT 1 and LDP DM 1 give general
encouragement to development on appropriate sites.  These main policy considerations
are underpinned by the SG contained with SG LDP HOU 1 and SG LDP ENV 14 which
offer further support to appropriate scales of residential development where such
development would have no significant adverse impact upon the character of the
landscape and where there is no unacceptable environmental, servicing or access impact. 
It is considered that this application to establish the principle of a residential development
would accord with the broad policy aims of NPF4 Policy 16 and would be in a location
underpinned by our adopted settlement strategy policies. 
The need in Policy 16(e) to make provision for 25% affordable homes within
developments will be secured through a condition imposed on the grant of permission. 
The need in Policy 16(f)(i) to ensure that development proposals for an agreed timescale
for build-out will be covered through the use of a planning condition. 
Whilst the development proposed by this planning application is on land not actively
allocated for housing in the LDP, it would wholly accord with the adopted settlement
strategy and would accord with the principles of ‘local living’ and ’20 minute
neighbourhoods’ consistent with the requirements of Policy 16(f)(ii). 
With regards to Policy 16(f)(iii), the proposal represents a scale of development which is
afforded support through the settlement strategy set out in the adopted LDP.  Given that
the proposal does not represent a major development, it is considered to represent an
opportunity for smaller scale development within the defined settlement boundary of
Oban, consistent with the requirements of Policy 16 (f)iii.

Page 33

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
The proposed development aligns with NPF4 Policy 16 as underpinned by LDP
Policies LDP DM 1, LDP 8 and SG LDP HOU 1 and Policy 02 of pLDP2 and the
current proposal would raise no issue of conflict should permission be granted. 
4.11. NPF4 Policy 18 – Infrastructure First 
NPF4 18 seeks to encourage, promote and facilitate an infrastructure first approach to
land use planning, which puts infrastructure considerations at the heart of placemaking. 
The application indicates water and drainage supplies to serve the proposed development
via connection to the public systems in the control of Scottish Water.  In their response to
the application Scottish Water raised no objection to the proposed development but
advised that further investigations may be required once formal applications for
connection to their infrastructure are submitted to them for consideration.  Scottish Water
further advised that, according to their records, the development proposals impact on
existing Scottish Water assets and that any conflict with assets identified may be subject
to restrictions on proximity of construction.   Accordingly, should permission be granted,
an informative will be added to the grant of PPP advising the applicant to contact Scottish
Water to discuss connection to their infrastructure. 
The proposed development aligns with NPF4 Policy 18 as underpinned by LDP
Policies LDP 11 and Policies 04, 05 and 08 of pLDP2 and the current proposal would
raise no issue of conflict should permission be granted. 
4.12. NPF4 Policy 21 – Play, Recreation and Sport 
NPF4 Policy 21 seeks to encourage, promote and facilitate spaces and opportunities for
play, recreation and sport. 
Part (d) of NPF4 Policy 21 seeks that development proposals which are likely to be
occupied or used by children and young people will be supported where they incorporate
well-designed, good quality provision for play, recreation, and relaxation that is
proportionate to the scale and nature of the development and existing provision in the
area. 
As detailed above, the application is seeking to establish the principle of a residential
development with the indicative layout submitted showing how the site could
accommodate 44 dwellings and the associated casual and equipped open space. 
However the specific detail of the casual and equipped open space will be properly
assessed through a subsequent future planning application(s). 
With a condition to secure the details of the areas of communal open space and
equipped play area(s) the proposed development aligns with NPF4 Policy 21 as
underpinned by LDP Policies LDP 8, SG LDP HOU 3 and Policy 68 of pLDP2 and
the current proposal would raise no issue of conflict should permission be granted. 
4.13. NPF4 Policy 22 – Flood Risk and Water Management 
NPF4 Policy 22 seeks to strengthen resilience to flood risk and to ensure that water
resources are used efficiently and sustainably. 
As detailed above the development proposes connection to the public water supply to
which Scottish Water has not objected to.  With regards to the management of rain and
surface water at the site, in their response to the application, the Council’s flooding
advisors, JBA, raised no objection to the proposed development subject to conditions

Page 34

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
being imposed on the grant of permission to ensure that a detailed drainage assessment
is undertaken and that the surface water drainage system for the site is designed in
accordance with CIRIA C753 and Sewers for Scotland 4th Edition.   
The proposed development aligns with NPF4 Policy 22 as underpinned by LDP
Policies LDP 10 and SG LDP SERV 2 and Policy 61 of pLDP2 and the current
proposal would raise no issue of conflict should permission be granted. 
5. Public Representation 
5.1. The application has been subject to 77 objections from 66 households, one representation
and an objection from the Oban Community Council. 
It is not considered that the objections raise any complex or technical issues that have
not been addressed in the current Report of Handling. 
The objections submitted to this application do not raise any new matters to those which
were raised and considered during the processing of the previous application.   
6. Conclusion 
6.1. The principle of development on this site has been established by the granting of PPP
18/02720/PPP.   
Whilst this permission has expired, it is still considered to represent a material
consdieraiton in the current proposal which effectively seeks to renew the previous
permission. 
Through the granting of the previous PPP, the Planning Authority was satisfied that the
indicative plan successfully demonstrated that the site is appropriate for residential
development.  However, whilst the indicative plan demonstrates to the satisfaction of the
Planning Authority that the site is capable of accommodating residential development, the
specific detail of that development must be properly assessed through a subsequent
future planning application(s). 
No objections have been received from consultees with regards to the proposed
infrastructure to serve the proposed development. 
There has been no change in the circumstances of the site, infrastructure and planning
policy since the previous permission was granted and it is recommended that a further
PPP is granted subject to the conditions contained within this report.

Page 35

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
COMMITTEE REPORT
APPENDIX B – RELATIVE TO APPLICATION NUMBER:  23/00376/PPP 
LIST OF CONTRIBUTORS 
OBJECTION 
Contributor Name  Contributor Address  Date Received 
Donna Robertson  By e-mail only  13/03/23 
Rebecca Horne  By e-mail only  13/03/23
Finlay Mackay By e-mail only  13/03/23 
Mr Scott Hetherington  33 Nant Drive, Oban, PA34 4LA  14/03/23 
Mrs Helen Hetherington  33 Nant Drive, Oban, PA34 4LA  14/03/23 
Kenneth Devine  7 Creran Gardens, Oban, PA34 4JU  14/03/23
Helen Jackson  By e-mail only  14/03/23
Mrs Maree Neilson  23 Nant Drive, Oban, PA34 4LA  15/03/23 
Miss Susan Robinson  56 Nant Drive, Oban, PA34 4LA  15/03/23 
Mrs Elizabeth MacLeod  59 Nant Drive, Oban, PA34 4LA 15/03/23 
Mr Keith Miller  Tigh a Ghlinne, Glenshellach Road, Oban,
PA34 4PP
15/03/23 
Mr A. MacKenzie  53 Nant Drive, Oban, PA34 4LA 16/03/23 
Morvan Rokitta  By e-mail only  16/03/23 
Mr Alister Jackson  11 Lonan Drive, Oban, PA34 4NN  16/03/23 
Ms Francesca Bichard  40 Nant Drive, Oban, PA34 4LA  17/03/23 
Sarah Kerr 6 Etive Gardens, Oban, PA34 4JP 17/03/23 
Mr C.E. Morrison  3 Creran Gardens, Oban, PA34 4JU  17/03/23 
Julie Didcock  By e-mail only  17/03/23 
Mrs Patricia Motrrison  3 Creran Gardens, Oban, PA34 4JU  19/03/23 
Mr Robert MacCallum  4 Etive Gardens, Oban, PA34 4JP 19/03/23 
Mrs E. MacKenzie  By e-mail only  18/03/23 
Mrs Kirsteen Gillespie 31 Nant Drive, Oban, PA34 4LA  20/03/23 
Mr F. MacKenzie  29 Nant Drive, Oban, PA34 4LA  20/03/23
Mrs M. MacKenzie  29 Nant Drive, Oban, PA34 4LA  20/03/23 
Mrs E. MacKinnon 11 Coe Gardens, Oban, PA34 4JT  21/03/23 
Mr Robert MacKinnon 11 Coe Gardens, Oban, PA34 4JT  21/03/23
Mrs Lesley
McKerracher
75 Nant Drive, Oban, PA34 4NL 21/03/23
Mrs Sandra Payne-
Russell
3 Feochan Gardens, Oban, PA34 4NJ 21/03/23 &
16/08/23
Mrs V. Mair  21 Nant Drive, Oban, PA34 4LA  21/03/23 
Mr Iain Grant  27 Nant Drive, Oban, PA34 4LA  21/03/23 
Mrs Chrissie Grant  27 Nant Drive, Oban, PA34 4LA  21/03/23 
Mr Eric Smith  70 Nant Drive, Oban, PA34 4NL 21/03/23 
Mrs Helen Smith  5 Etive Gardens, Oban, PA34 4JP 22/03/23 
Miss Heather Whittaker  12 Lawe Road, Oban, PA34 4NW  22/03/23 
Mr Iain MacFarlane
Brown 
25 Nant Drive, Oban, PA34 4LA  23/03/23 
Margaret Melville 2 Etive Gardens, Oban, PA34 4JP  23/03/23 
Ann Buchanan Strathaird, Connel, PA37 1PH  24/03/23 
David MacMillan  49 Nant Drive, Oban, PA34 4NL  24/03/23

Page 36

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Jean Sutherland  9 Creran Gardens, Oban, PA34 4JU  27/03/23 
Elspeth Norris Feochan Gardens, Oban  27/03/23 
Robert McDonald  By e-mail only  27/03/23 
Mr J. Cook  17 Creran Gardens, Oban, PA34 4JU  27/03/23 
Kenneth Moncrieff  108 Nant Drive, Oban, PA34 4NL 28/03/23 &
17/08/23 
Alice Johnston  By e-mail only  28/03/23 
Mr Colin Cooper  1 Lonan Drive, Oban, PA34 4NN 29/03/23 &
23/08/23 
Mrs Mundi Cooper  1 Lonan Drive, Oban, PA34 4NN 29/03/23 &
23/08/23 
Mr Andrew MacDougall 14 Etive Gardens, Oban, PA34 4JP 29/03/23 
Mr James Muir  1 Creran Gardens, Oban, PA34 4JU  29/03/23 
Mrs Jennifer Miller  Tigh a Ghlinne, Glenshellach Road, Oban,
PA34 4PP
29/03/23 
Mrs R. Russell  23 Lonan Drive, Oban, PA34 4NN  29/03/23 
Dr M.S. Kelly  Soroba Farm Cottage, Oban, PA3 4SB  29/03/23 
Tommy Johnson  6 Creran Gardens, Oban  29/03/23 
Eamonn Arthur  19 Lonan Drive, Oban, PA34 4NN 29/03/23 
Maureen Arthur  19 Lonan Drive, Oban, PA34 4NN  29/03/23 
Mrs Catriona Reid  17 Coe Gardens, Oban, PA34 4JT 30/03/23 
Miss Katherine Reid  17 Coe Gardens, Oban, PA34 4JT  30/03/23 
Mr Ian MacKechnie  17 Orchy Gardens, Oban, PA34 4JR  30/03/23 
Mr William McKillop  13 Creran Gardens, Oban, PA34 4JU  30/03/23,
15/08/23  
Mrs A. Owens  5 Feochan Gardens, Oban, PA34 4NJ 30/03/23 
Marri Malloy  7 Orchy Gardens, Oban  30/03/23 
Mrs Nina Graham  10 Lawe Road, Oban, PA34 4NW  31/03/23 
Ms Fiona MacDougall Tigh na Drochaid, Soroba Road, Oban, PA34
4JJ
31/03/23 
Ms Claire Smalley Whinhurst, Glenshellach Road, Oban, PA34
4PP
31/03/23 
Derek Pretswell 7 Etive Gardens, Oban, PA34 4JP  31/03/23 
Laura May By e-mail only  31/03/23 
Mr Craig MacMillan  25 Lonan Drive, Oban, PA34 4NN  31/03/23 
Mrs Leah MacMillan  25 Lonan Drive, Oban, PA34 4NN  31/03/23 
Lindsay Nicholson  By e-mail only  03/04/23 
Mrs Patricia Galbraith  37 Nant Drive, Oban, PA34 4NL  03/04/23 
Freddy Morrison  19 Creran Gardens, Oban, PA34 4JU 03/04/23
Brenda Morrison  19 Creran Gardens, Oban, PA34 4JU 03/04/23 
Aileen Cameron  By e-mail only  03/04/23 
Brian MacKechnie  1 Coe Gardens, Oban, PA34 4JT  03/04/23 
Mrs Carol Burnside  45 Nant Drive, Oban, PA34 4NL 03/04/23 
Dr Robert Batty  6 Coe Gardens, Oban, PA34 4JT  04/04/23 
Mrs Margaret Batty  6 Coe Gardens, Oban, PA34 4JT  04/04/23 
A. Cooper  9 Feochan Gardens, Oban, PA34 4NJ 16/08/23 
REPRESENTATION 
Contributor Name  Contributor Address  Date Received

Page 37

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 15.06.2023 
Oban District Access
Panel 
By e-mail only  13/03/23