Democracy Spraffa

Notice of Review Submitted by Applicant

North Lanarkshire Council · 22 March 2023
Back to Local Review Body — 22 March 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.

Page 1

Page 1 of 5
Civic Centre Windmillhill Street Motherwell ML1 1AB  Tel: 01236 632500  Fax: 01698 302115  Email: esPlanning@northlan.gov.uk
Applications cannot be validated until all the necessary documentation has been submitted and the required fee has been paid.
Thank you for completing this application form:
ONLINE REFERENCE 100531542-003
The online reference is the unique reference for your online form only. The  Planning Authority will allocate an Application Number when
your form is validated. Please quote this reference if you need to contact the planning Authority about this application.
Applicant or Agent Details
Are you an applicant or an agent? * (An agent is an architect, consultant or someone else acting
on behalf of the applicant in connection with this application)  Applicant  Agent
Agent Details
Please enter Agent details
Company/Organisation:
Ref. Number: You must enter a Building Name or Number, or both: *
First Name: * Building Name:
Last Name: * Building Number:
Address 1
Telephone Number: * (Street): *
Extension Number: Address 2:
Mobile Number: Town/City: *
Fax Number: Country: *
Postcode: *
Email Address: *
Is the applicant an individual or an organisation/corporate entity? *
  Individual    Organisation/Corporate entity
OSD Design Solutions Ltd
David
Aitcheson
Suite 1/J3
International House
07807494293
G72 0BN
United Kingdom
GLASGOW
Stanley Boulevard, Blantyre,
david@osddesign.co.uk

Page 2

Page 2 of 5
Applicant Details
Please enter Applicant details
Title: You must enter a Building Name or Number, or both: *
Other Title: Building Name:
First Name: * Building Number:
Address 1
Last Name: * (Street): *
Company/Organisation Address 2:
Telephone Number: * Town/City: *
Extension Number: Country: *
Mobile Number: Postcode: *
Fax Number:
Email Address: *
Site Address Details
Planning Authority:
Full postal address of the site (including postcode where available):
Address 1: 
Address 2:
Address 3:
Address 4:
Address 5:
Town/City/Settlement:
Post Code:
Please identify/describe the location of the site or sites
Northing Easting
Mrs
Sheila
North Lanarkshire Council
Oakes Allanton
Land off Mill Road
ML7 5DD
Land off Mill Road, Allanton.
Scotland
657411
Shotts
284728
sheilaoakes@hotmail.com

Page 3

Page 3 of 5
Description of Proposal
Please provide a description of your proposal to which your review relates. The description should be the same as given in the
application form, or as amended with the agreement of the planning authority: *
(Max 500 characters)
Type of Application
What type of application did you submit to the planning authority? *
  Application for planning permission (including householder application but excluding application to work minerals).
  Application for planning permission in principle.
  Further application.
  Application for approval of matters specified in conditions.
What does your review relate to? *
  Refusal Notice.
 Grant of permission with Conditions imposed.
  No decision reached within the prescribed period (two months after validation date or any agreed extension) – deemed refusal.
Statement of reasons for seeking review
You must state in full, why you are a seeking a review of the planning authority’s decision (or failure to make a decision). Your statement
must set out all matters you consider require  to be taken into account in determining your review. If necessary this can be provided as a
separate document in the ‘Supporting Documents’ section: *  (Max 500 characters)
Note: you are unlikely to have a further opportunity to add to your statement of appeal at a later date, so it is essential that you produce
all of the information you want the decision-maker to take into account.
You should not however raise any new matter which was not before the planning authority at the time it decided your application (or at
the time expiry of the period of determination), unless you can demonstrate that the new matter could not have been raised before that
time or that it not being raised before that time is a consequence of exceptional circumstances.
Have you raised any matters which were not before the appointed officer  at the time the  Yes   No
Determination on your application was made? *
If yes, you should explain in the box below, why you are raising the new matter, why it was not raised with the appointed officer before
your application was determined and why you consider it should be considered in your review: * (Max 500 characters)
Proposal: Dwellinghouse with garage and access (in principle) Address: Site At, Mill Road, Allanton, North Lanarkshire
FULL STATEMENT APPENDED TO APPLICATION PAPERWORK Refer 'Appeal Statement.pdf''
We had to constantly chase up the decision and were continuously told it was imminent. The whole process took 8 months and at
no point was additional information requested of us.  It just seemed the process was not assessed properly for what ever reason
workload/staffing/new polices/incorrect polices.

Page 4

Page 4 of 5
Please provide a list of all supporting documents, materials and evidence which you wish to submit with your notice of review and intend
to rely on in support of your review. You can attach these documents electronically later in the process: * (Max 500 characters)
Application Details
Please provide the application reference no. given to you by your planning
authority for your previous application.
What date was the application submitted to the planning authority? *
What date was the decision issued by the planning authority? *
Review Procedure
The Local Review Body will decide on the procedure to be used to determine your review and may at any time during the review
process require that further information or representations be made to enable them to determine the review. Further information may be
required by one or a combination of procedures, such as: written submissions; the holding of one or more hearing sessions and/or
inspecting the land which is the subject of the review case.
Can this review continue to a conclusion, in your opinion, based on a review of the relevant information provided by yourself and other
parties only,  without any further procedures? For example, written submission, hearing session, site inspection. *
 Yes   No
In the event that the Local Review Body appointed to consider your application decides to inspect the site, in your opinion:
Can the site be clearly seen from a road or public land? *  Yes   No
Is it possible for the site to be accessed safely and without barriers to entry? *  Yes    No
Checklist – Application for Notice of Review
Please complete the following checklist to make sure  you have provided all the necessary information in support of your appeal. Failure
to submit all this  information may result in your appeal  being deemed invalid.
Have you provided the name and address of the applicant?.  *  Yes   No
Have you provided the date and reference number of the application which is the subject of this  Yes   No
review? *
If you are the agent, acting on behalf of the applicant, have you provided details of your name  Yes   No   N/A
and address and indicated whether any notice or correspondence required in connection with the
review should be sent to you or the applicant? *
Have you provided a statement setting out your reasons for requiring a review and by what  Yes   No
procedure (or combination of procedures) you wish the review to be conducted? *
Note: You must state, in full, why you are seeking a review on your application. Your statement must set out all matters you consider
require to be taken into account in determining your review. You may not have a further opportunity to add to your statement of review
at a later date. It is therefore essential that you submit with your notice of review, all necessary information and evidence that you rely
on and wish the Local Review Body to consider as part of your review.
Please attach a copy of all documents, material and evidence which you intend to rely on  Yes   No
(e.g. plans and Drawings) which are now the subject of this review *
Note: Where the review relates to a further application e.g. renewal of planning permission or modification, variation or removal of a
planning condition or where it relates to an application for approval of matters specified in conditions, it is advisable to provide the
application reference number, approved plans and decision notice (if any) from the earlier consent.
Appeal Statement.pdf -Decision Notice-DECISION NOTICE.pdf Planning Timeline.pdf Validation Letter 22-00232-PPP Ack.pdf
Email Correspondence Original Planning Application Package
22/00232/PPP
03/11/2022
01/03/2022

Page 5

Page 5 of 5
Declare – Notice of Review
I/We the applicant/agent certify that this is an application for review on the grounds stated.
Declaration Name: Mr David Aitcheson
Declaration Date: 01/02/2023

Page 6

Applicant: Mrs Shiela Oakes
Planning Ref: 22/00232/PPP
Site: Site At, Mill Road, Allanton, North Lanarkshire 
Proposal:  Dwellinghouse with garage and access (in principle). 
STATEMENT OF APPEAL 
Following the refusal of our planning application we feel we have been unjustly refused planning for 
numerous reasons. 
The formal reasons for refusal extracted from the decision document is noted below: 
The proposal is contrary to local development plan, as it constitutes inappropriate, sporadic, and 
isolated development in the Countryside. It does not meet the appropriateness criteria under the 
local development plan policy PP5 (Countryside) or the standards of the Environmental and Design 
Qualities  policy  EDQ  1,  and  no  adequate  justification,  special  circumstances  or  material 
considerations have been demonstrated to merit a departure from the development plan. 
It is noted that the formal reason for refusal confirms the need of compliance with policies PP5 and 
EDQ1, there is no mention on the lack of compliance with policy EDQ3 as a reason to deny planning 
approval. However, the handing report appears to penalise the application and refuse planning given 
policy EDQ3 is not satisfied. We assume this is due to this application being for outline planning and a 
full assessment of EDQ3 cannot be undertaken given no full plans for the dwelling were submitted 
other than the appellants requirements for the new house outlined in the supporting statement. 
A full assessment under policy EDQ3 would be done when an application for full planning is lodged for 
the house on receipt of outline planning however we would argue that the supporting statement gave 
the planners sufficient information to understand the appellants requirements of the house and 
suitably condition an approval. 
Denying approval based on a lack on application not relevant to an outline planning application seems 
unreasonable. 
PROCESS AND TIMELINE 
Our proposals for a single house and detached garage were seen as contrary to the local development 
plan as it constituted “inappropriate, sporadic, and isolated development in the Countryside” 
The  planners  view  that  appropriateness  as  measured  under  the  criteria  of  PP5  were  not  met, 
additionally the standards of Environmental and design qualities as set out in EDQ1 were not met or 
that sufficient justification to merit an approval had not been provided. 
At the time of the application the  appellant had not yet purchased the land however the land deal 
was subject to receipt of planning permission for the house, from the NLC’s own validation letter 
received on the 6th May 2022 a decision was to be issued by no later than the 5th July 2022 – “unless 
we have agreed an extended decision date with you in writing.”

Page 7

To be clear, an extension was not agreed in writing, an extension was not even requested until the 
20th September 2022 where a mere 10 day extension was requested (and subsequently missed as 
well). 
 
Given the elongated planning timeline the appellant had to decide to either lose out on the land or 
risk purchase without confirmation of planning approval, a risk that should never have been enforced 
upon them. The appellant therefore had no choice but to buy the land as their existing property had 
now been sold. 
 
A second extension of time was requested on the 2/11/22 until the 4/11/22 where confirmation of 
refusal was emailed, by this time the planning process had taken from the 1/3/22 to the 4/11/22 and 
the client had been forced to move out of their existing property and purchase land with no comfort 
planning were ever going to issue a decision. This decision date was 4 months beyond the planners 
own defined deadline and finalised an 8‐month planning process in total. 
 
The appellant has purchased land with now temporary accommodation at huge expense and a belated 
refusal based on noncompliance with local polices that we wholly disagree with is why we wish to 
appeal the decision to refuse planning in principal. 
 
It should be noted that at the time of the application (1st March 2022), North Lanarkshire Council’s 
new local plan dated 6th July 2022 had not been adopted, as such the application was to be assessed 
under the now previous LDP.  
North Lanarkshire Council advised on the 20th July that new Local Plan had been “unexpectedly” 
agreed and adopted, 
Refer email dated 20/07/22. 
 
“Apologies for the delay in coming back to you on this. 
 
It is middle of the holiday period and I have been on leave as well as other members of the team. There 
has also bene the adoption of the new local development plan which was unexpectedly agreed by the 
Scottish Government so various reports have had to be rejigged to use the correct policies of the LDP. 
 
A decision should be with you in due course as we have a slight backlog as a result of this.” 
 
 
 
As a result we were advised that the application would have to be assessed again under the newly 
adopted policy. The reason for refusal under PP5 and EDQ1 are noted along with our appeal response 
below: 
“The proposal is contrary to local development plan, as it constitutes inappropriate, sporadic, and 
isolated development in the Countryside. It does not meet the appropriateness criteria under the 
local development plan policy PP5 (Countryside)”

Page 8

**Extract from North Lanarkshire Council handling report noted in blue** 
Assessment against Policy 
Policy PP5 (Countryside) 
However, in addition to this particular qualification of appropriateness, and with more flexibility in 
mind,  the  council  states,  through  policy  PP5,  that  proposals  for  limited  expansion  of  existing 
businesses and settlements, agricultural diversification and local job creation will be encouraged.  So, 
within the Countryside area, the assessment of appropriateness extends to assessing the proposal 
against the following key criteria to establish whether or not it can be supported. 
 
This criteria of policy PP5 and the assessment of the proposal against them hereby follows: 
 
THAT THE PROPOSAL IS COMPATIBLE WITH THE COUNTRYSIDE. 
The nature of the proposal is not an alien concept in the countryside and, strictly in that sense, the 
development would be compatible. Any further judgement of compatibility (as regards details such 
as location scale, and design) would be addressed in relation to Environmental and Design Qualities 
Policies  policy  EDQ  1  and  EDQ  3.  So,  only  if  the  proposal  can  be  assessed  positively  against 
Environmental and Design Qualities Policies policy EDQ 1, and EDQ 3 (assessment to follow), the 
development may be regarded as acceptable for appropriateness under this criterion of policy PP5. 
 
Given the planners own assessment as highlighted and underscored above confirms that the proposals 
are suitable under PP5 providing policies EDQ1 and EDQ3 are satisfied then the main focus of this 
appeal will be specific to these polices and outlined below. 
Assuming EDQ1 & EDQ3 are satisfied, we assume the at the decision for refusal of planning can be 
overturned. 
As previously noted, the refusal notice gave no mention of policy EDQ3, why then is the proposal being 
assessed under this policy when the nature of outline planning cannot be fully assessed without full 
planning. Again, surely approval with conditions at this stage allows the appellant and planners to 
collectively ensure EDQ3 is fully satisfied of the submission of a subsequent application for  full 
planning. 
 
THAT PROPOSAL IS NOT BEST SUITED TO BEING LOCATED IN A CENTRE, OR GENERAL URBAN AREA. 
Provided the development is regarded as compatible with Countryside as discussed in the criterion 
above and, assuming the proposal can be assessed positively against Environmental and Design 
Qualities Policies policy EDQ 1, and EDQ 3, the proposal would be regarded as equally suited to the 
Countryside zoned area when compared with other character areas such as centres or general urban 
areas. So, on this basis, if the proposal can be assessed positively against Environmental and Design 
Qualities Policies EDQ 1, and EDQ 3 (assessment to follow), and is compatible with the countryside 
under the criterion above, the development may be regarded as acceptable for appropriateness under 
this criterion of policy PP5.

Page 9

As previously stated, assuming EDQ1 & EDQ3 are satisfied, we assume the at the decision for refusal 
of planning can be overturned however our query about an inability to assess under EDQ3 remains. 
It is unreasonable to refuse planning in principal based on a lack of information required or issued in 
an outline planning application. 
 
 
THAT  THE  PROPOSAL  FITS  THE  SCALE  AND  NATURE  OF  EXISTING  DEVELOPMENT  IN  THE 
COUNTRYSIDE (all proposals require to satisfy the provisions of all EDQ Policies). 
If the proposal can be assessed positively against Environmental and Design Qualities Policies policy 
EDQ 1, and EDQ 3 (assessment to follow), the development may be regarded as acceptable for 
appropriateness under this criterion of policy PP5. 
As previously stated, assuming EDQ1 & EDQ3 are satisfied, we assume the at the decision for refusal 
of planning can be overturned however our query about an inability to assess under EDQ3 remains. 
It is unreasonable to refuse planning in principal based on a lack of information required or issued in 
an outline planning application. 
It should be noted that it is clear even from the submission the scale and nature of the proposal are 
very much in keeping with the existing development, so much so there were no objections from any 
local residents or statutory consultees. 
 
 
 
THAT THE PROPOSAL IS AN EXPANSION OF AN EXISTING BUSINESS AND/OR SETTLEMENT IN THE 
COUNTRYSIDE. 
The development is not an expansion to an existing settlement. It for example is not connected or 
adjacent to any village. It is therefore not acceptable for appropriateness under this criterion of policy 
PP5. 
The comment that this proposal is not an expansion of an existing settlement can be argued in that 
the  surrounding  area  is  a  collection  of  sporadic  isolated  developments  already  rather  than  an 
extension to an existing settlement. 
The arial view as noted below highlights a number of small single dwellings along Mill Road. The 
addition of this new dwelling not only is sympathetic to the existing area but will also be completely 
hidden from all other properties given its location in the wooded area approx. 150m off Mill Road.

Page 10

The proposals will have no affect on any existing properties in the surrounding area. 
 
 
 
 
 
**circles denote existing single dwellings surrounding site** 
 
 
THAT THE PROPOSAL IS AN EXPANSION/REPLACEMENT OF AN EXISTING BUILDING OR CLUSTER OF 
BUILDINGS IN THE COUNTRYSIDE (all proposals require to satisfy the provisions of all EDQ Policies).  
The development is not an expansion to an existing buildings cluster. It is a secluded site, as confirmed 
by the applicant, and as such it represents the kind of isolated development that Policy PP5 seeks 
specifically to avoid.  
Whilst we note the comment above again we refer back to the general comment that, assuming EDQ1 
& 3 are satisfied, “the development may be regarded as acceptable for appropriateness under this 
criterion of policy PP5” we assume the at the decision for refusal of planning can be overturned.

Page 11

THAT THERE IS A SPECIFIC LOCATIONAL REQUIREMENT FOR THE PROPOSAL. 
There is no locational need and therefore the development would not be regarded as acceptable for 
appropriateness under this criterion of policy PP5 
There may not be a locational need for North Lanarkshire council however there is certainly a 
locational need for the appellant. The idea of building an Eco home in a rural area has been something 
they have looked to do for some time, the design and location of the dwelling and the reinvestment 
in tree and landscaping is an improvement to the area. The locational need of the area from the clients 
perspective is further enhanced by the position they find themselves in due to unacceptable planning 
timelines. 
Again, Whilst we note the comment above again we refer back to the general comment that , 
assuming  EDQ1  &  3  are  satisfied,  “the  development  may  be  regarded  as  acceptable  for 
appropriateness under this criterion of policy PP5” we assume the at the decision for refusal of 
planning can be overturned. 
 
THAT THE PROPOSAL WILL RESULT IN SIGNIFICANT ECONOMIC BENEFIT. 
Clear significance of economic benefit might add weight to justify a proposal especially when there 
are other considerations suggesting against it. The applicant has not offered any case of economic 
benefit from the dwellinghouse. 
It would be difficult to argue that any single residential dwelling can provide ‘significant’ economic 
benefits however local contractors and suppliers may benefit from work during the build. Very much 
short term economic benefits admittedly however certain local suppliers and contractors would see 
in increase in business. Again, whilst we note the comment above we refer back to the general 
comment that , assuming EDQ1 & 3 are satisfied, “the development may be regarded as acceptable 
for appropriateness under this criterion of policy PP5” we assume the at the decision for refusal of 
planning can be overturned. 
 
THAT THE PROPOSAL DOES NOT ADVERSELY IMPACT TRAVEL PATTERNS AND ACCESSIBILITY BY 
SUSTAINABLE MODES OF TRANSPORT (all proposals require to satisfy the provisions of Policies CI 3, 
EDQ 1 and EDQ. 
If the proposal can be assessed positively against Environmental and Design Qualities Policies policy 
EDQ 1 and EDQ 3 (assessment to follow), the development may be regarded as acceptable for 
appropriateness under this criterion of policy PP5. 
Noted.

Page 12

The reason for refusal under EDQ 1 and EDQ3 is noted along with our appeal response below: 
“or the standards of  the Environmental and  Design Qualities policy EDQ  1, and no adequate 
justification, special circumstances or material considerations have been demonstrated to merit a 
departure from the development plan.” 
 
**Extract from North Lanarkshire Council handling report noted in blue** 
Policy EDQ 1 and EDQ 3 
Compliance with these policies is both important in its own right, and also in terms of the proposal 
achieving full compliance with the abovementioned Policy PP5.  
 
Policy EDQ 1 Site Appraisal requires any development to be appraised in terms of the site and its 
surroundings to ensure it will integrate successfully into the local area and avoid harm to neighbouring 
amenity. This appraisal addresses matters such as design, massing, topography and transportation 
aspects. Policy EDQ3 Quality of Development sets out that development will only be permitted where 
high standards of site planning and sustainable design are achieved. Aspects such as siting; overall 
layout; density; form; scale; height; massing; proportion; detailing; colour; materials for the proposed 
development need to be considered. Policy EDQ 3 also includes aspects related to creating areas which 
are safe for all road users with appropriate parking included within the development. The assessment 
of and (where necessary) the mitigation of pollution impacts is also included within policy EDQ 3. 
The planners report states that compliance with PP5 is contingent upon satisfying the criteria of 
polices EDQ1 and EDQ 3. From above “EDQ 1 Site Appraisal requires any development to be appraised 
in terms of the site and its surroundings to ensure it will integrate successfully into the local area and 
avoid harm to neighbouring amenity” 
Given this application was for approval in principle for a new dwelling the planners assessment was 
based on site plans and supporting statements outlining the proposals in detail without submission of 
full house design packages. 
The information provided information on key areas and confirmed the developments suitability in 
terms of policy EDQ1 in that the proposals would definitely “integrate successfully into the local area 
and avoid harm to neighbouring amenity” by assessing the following criteria: 
 Siting 
 Design and materials 
 Daylight/Sunlight  
 Boundary Treatment 
 Privacy  
 Adjacent Levels  
 Landscaping and garden areas 
 Access Parking and Turning 
 Consultees 
 Ecology 
 Pollution Control 
 Site constraints

Page 13

The information as confirmed in the supporting statement provided confirmation that the 
general design would very much be to a high standard and performance in terms of its ECO  
aspects whilst having a minimum affect of the surrounding area.  
 
This location would have zero effect of any of the existing properties and the removal of any 
tree or landscaping would be replaced, they could not be anymore compliant in terms of 
EDQ1 and this was clearly demonstrated albeit without full submission of house plans. 
 
Surely the planners could have granted permission is principal given they would have further 
opportunities to satisfy themselves with compliance with EDQ1 (and EDQ3) in that the 
subsequent full planning application for the actual house would have followed on shortly 
after. 
 
For the purposes of record, this process was acceptable to NLC only 100m along Mill road in 
2020. 
 
20/00190/PPP Single dwellinghouse (in principle) Approved with conditions  
 
21/00094/MSC Dwellinghouse with private domestic sewage and waste water treatment plant 
Approved with conditions  
 
The approved applications as noted above were for the erection of a single 1.5 storey residential 
dwellings along Mill Road with packages sewer treatment plant and driveway access. 
 
Was the unexpected adoption of the Local plan mid application the reason why this is no longer 
acceptable? 
 
Were the issues with new policy wording as confirmed by planning (to explain further delays) the 
reason why this is no longer acceptable? 
 
Regardless, we would submit that the information provided was not only sufficient to confirm 
compliance with EDQ 1 but also provide planning with the added comfort of a second full 
application to satisfy themselves of no detriment to surrounding environment. 
 
The fact a precedent for this development has already been established only two years ago 
further backs up why we think this decision should be overturned. 
 
In relation to policy EDQ 1, the key consideration of this would be the assessment of the proposal in 
regard to integration and amenity. In this case the site would be considered sporadic and isolated 
(impacts that Policy PP5 specifically seeks to avoid) and there is no meaningful existing cluster or 
settlement to which it would relate. As the proposal would lack the integration required by Policy EDQ, 
it would be contrary to this policy   
From our previous comment, the sporadic nature of these small houses along Mill Road are the norm 
and our proposals would not look out of context in the area.

Page 14

In actual fact, the proposals as submitted confirmed that the proposals would not be seen from Mill 
road or any other existing dwellings, it is hard to understand why planning felt like this demonstrated 
a lack of integration, we would argue that the level of integration far exceeds any other property along 
Mill Road given it’s location within the wooded area. 
In that regard, compliance with EDQ1 is further demonstrate and our request to overturn the decision 
for refusal is further demonstrated. 
 
 
With regard to policy EDQ 3, the application is for the consideration of the principle of locating a 
dwellinghouse at this site and so the actual detailed design of the site and layout would not be a 
consideration at this point. 
Agreed, given the impossibility to fully assess the proposals under EDQ3 we would submit that given 
the planners knew that the application was for a dwelling “in principal” it is unfair to refuse under a 
policy that cannot be fully assessed at this stage. 
 
At no point did the planners request further information in regard to an inability to assess against this 
policy. The information provided in the application pack however did contain sufficient information 
that the proposals would be looking to fully adhere to EDQ3 in that it would include aspects related 
to creating areas which are safe for all road users with appropriate parking included within the 
development and where necessary the mitigation of pollution impacts within policy. 
This was all confirmed in writing and as previously mentioned, the submission of a subsequent 
full planning application for the actual house would have followed on shortly after which 
could have been fully assessed under EDQ3. 
 
 
 
Taking into account the assessment above, it is considered that the proposed development would not 
be compliant with policy EDQ1.  The assessment conclusions would be neutral against policy EDQ3 as 
there are no details to consider at this stage.   
We would submit that given compliance was demonstrated with policy EDQ1 and EDQ3 in a limited 
capacity due to the nature of an outline planning application we would suggest that the relevant 
information was indeed provided to show compliance with policy PP5 and request planning be 
overturned and granted with conditions. 
This would allow the appellant to lodge full planning and provide planning with further information to 
confirm suitability with policy EDQ3 and PP5.

Page 15

OSD DESIGN SOLUTIONS LTD
New Dwelling Houses (In principle) Supporting Statement
Land off Mill Road, Allanton.
Rev -
D Aitcheson
5/11/2022

Page 16

Page | 2 
CONTENTS PAGE 
Section 1
Introduction.           
Section 2
Background Information.         
2.1 Supporting Narrative
2.2 Planning History 
Section 3
Site Appraisal.           
Section 4
Local Policies.           
Section 5
Conclusions.

Page 17

Page | 3 
SECTION 1 – INTRODUCTION 
The proposals described within this document have been developed by OSD Design Solutions Ltd
and the client following the policy guidance set out by North Lanarkshire Council's Local
Development Plan. 
The proposals are for the erection of one no. new dwelling (in principle) on vacant land located
adjacent to existing residential properties. The land is currently located in the rural investment
area and subject to the country side policies in the local plan. 
The full plot address is: Land off Mill Road, Allanton. 
The land, currently vacant sits to the west of the Mill Road and an existing Scottish Power Sub
Station. There are existing residential dwellings to the east, North and South of the site. 
The western edge of the site has an electricity pylon with an access servitude to the southern
extent of the site.

Page 18

Page | 4 
SECTION 2 – BACKGROUND INFORMATION 
2.1 Supporting Narrative. 
OSD Design has been appointed the client to oversee the project from concept through in its entirety
to completion. 
The site sits level with Mill Road and is predominately overgrown with trees and bushes. There are
no Tree Preservation orders (TPO’s) in place that will affect the removal to suit the new driveway
access, the proposals for the 1.5 story plot will be to the rear of the site in an area with very little tree
growth to minimize the removal of and existing landscaping. 
The client would also seek to replant any loss of trees as a result of the proposals. 
The proposed location of the house would remain behind the existing tree screening at Mill Road to
ensure the existing street scene is unchanged and the client benefits from the seclusion and privacy
afforded at the Western edge or rear of the site. 
The plot would be accessed off Mill Road in line with the existing properties to the North, East and
South of the site. Access would be by a private driveway leading to rear of the site with bin storage
located adjacent to the road to allow for easy access for refuse vehicles. 
Visibility splays available at the site entrance as proposed is around 4.5 x 60m however this could be
increased should roads deem it a requirement. 
Access to the existing SPEN substation and the existing Telecoms equipment will be maintained at
all times and remain unchanged as a result of the proposals. No changes or encroachment in the
existing pylon servitude is proposed.

Page 19

Page | 5 
2.2 Planning History. 
No previous planning applications have been sought or granted for the site however planning in
principal and subsequent full planning was permitted for 1 no. 1.5 storey dwelling to the south of the
site. 
20/00190/PPP Single dwellinghouse (in principle) Approved with conditions 
21/00094/MSC Dwellinghouse with private domestic sewage and waste water treatment plant       
Approved with conditions 
The approved applications as noted above are for the erection of a single 1.5 storey residential
dwellings along Mill Road with packages sewer treatment plant and driveway access.

Page 20

Page | 6 
SECTION 3 – SITE APPRAISAL 
Reasoned Justification
In view of the location and character of the site and its position relative to neighbouring houses, the
development proposed in principle should be within the spirit and objectives of the relevant rural
investment area policies within the adopted North Lanarkshire Local Plan. 
Siting.
As previously noted, the site sits level off Mill Road and is protected by overgrown with trees and
bushes. There are no Tree Preservation orders (TPO’s) in place that will affect the removal to suit
the new driveway access, the proposals for the 1.5 story plot will be to the rear, or western edge
of the site in an area with very little tree growth to minimize the removal of and existing
landscaping. 
The client would also seek to replant any loss of trees as a result of the proposals. 
The proposed location of the house would remain behind the existing tree that fronts the eastern
edge along Mill Road to ensure the existing street scene is unchanged and the client benefits from
the seclusion and privacy afforded at the Western edge or rear of the site. 
Design and materials.
Although not included in this application in principle, the clients is looking to construct this
dwelling using SIPS panels to provide an ECO themed home incorporating renewables within the
proposals. Air Source heat pumps, water reclamation (grey water) systems and PV should the
sheltered nature of the site provide sufficient daylight. 
The look and design of the house is to be limited to 1.5 storey to remain in keeping with the
existing dwelling located on all but the Western edge of the site. 
Daylight/Sunlight
Given the isolated location daylight or sunlight issues will not be effected on any adjacent
dwellings 
Boundary Treatment.
The existing boundary to the east along Mill Road is fronted by a mix of low level hedgerows and
trees at varying stages of growth. 
The proposals seek to retain the existing boundary along the eastern edge of the site to provide
seclusion and privacy and maintain the current street scene along Mill Road. 
The formation of the new driveway access will require the removal of a small number of trees
however the client is looking to offset the loss with re-planting scheme within the site. 
Visibility splays of 4.5x60m can be accommodated at the formation of the new driveway access.
No gates are proposed to ensure no cars are stationary on Mill Road whilst awaiting entrance   to
the drive.

Page 21

Page | 7 
Privacy
Due to the location to the inner (or rear) western boundary, there should be no impact on the
privacy to the new dwelling or any existing dwellings. 
Adjacent Levels
The site sits level with Mill Road but falls towards the rear of the site at the western boundary.
Given the existing topography, all rain water can be dealt with within the site and remove the risk
of any rainwater running onto the existing carriageway on Mill Road. 
Landscaping and garden areas.
Given the site extents within the red line boundary total 3.188 Ha there are more than sufficient
ground to form garden areas, all of which privately concealed from the road behind the existing
tree screening. 
Access Parking and Turning.
A double garage is proposed within the plans to provide the required two parking spaces in line
with NLC policy however with more than sufficient land available, additional parking can be
accommodated should it be required. 
Consultees.
Green Space: It is noted that should planning in principle be granted, an ecological report would
be required given the rural nature of the site, we would ask that this be conditioned as part of a
subsequent application for full planning. 
Pollution Control: It is noted that should planning in principle be granted, an site investigation
report would be require, we would ask that this be conditioned as part of a subsequent
application for full planning. 
Site constraints. 
The site lies out with area at risk for Radon or mineral workings nor does not sit within an area
at risk of river or surface water flooding.

Page 22

Page | 8 
SECTION 4  - LOCAL POLICIES 
The location of the proposed development is such that the requirements and objectives of the rural
investment area policy NSBE3 within the adopted North Lanarkshire Local Plan are applicable. 
NSBE3, section B1 - Types of acceptable development
Given this policy states that types of acceptable developments are: “up to 4 housing units”.
The proposals, being for one unit with a Double garage the proposals are in accordance with this
policy. 
NSBE3, section B2 - Impact criteria.
NSBE3, section 2 seeks to assess impact criteria on the following grounds: 
Developments of up to 4 housing units, business, industry, or tourism up to 1,000sqm gross floor space
will be assessed against the following criteria:
a) enhance an existing cluster of development and acceptable in terms of design, scale, access
and countryside integration
b) enhance natural heritage value (e.g. through new planting or removal of intrusive features)
c) respect natural boundaries (road, tree line, watercourse) and include works to reinforce and
enhance boundaries and buffers
d) accord with the aims of Central Scotland Forest Strategy
e) avoid loss of prime agricultural land (Classes 1, 2 and 3.1) 
The proposals, in relation to NSBE3 (a), enhance an existing cluster of development and acceptable in
terms of design, scale, access and countryside integration. 
In line with SPG 08 and NLLP NBE3B, based on National Planning Guidance PAN720 allows for the siting
of new development in the RIA within or adjacent to an “existing building cluster”. 
However, the national guidance does not define a building cluster leaving NLC to provide what they
deem acceptable as “a cluster”. The NLC definition is as follows: 
“The buildings are closely grouped together within an average building footprint diameter of some 100
metres”. 
The proposals allow for the new dwelling 66m from the nearest cluster so cannot be deemed as part
of that however section H - NEW DWELLINGS & HOUSE EXTENSIONS of SPG 08 states that: 
PART 1. There is a general presumption in favour of granting planning permission for new dwellings
in the R.I.A if they are: 
a) sensitively located within or adjacent to an existing building cluster and
b) designed in such a way as to respect the local building form and detail. 
In accordance with section a). The proposals allow for the new dwelling to be located to the rear of
the site and completely hidden from the existing street and existing houses by the retention and
enhancement of the existing natural tree screening to all boundaries. The definition of “sensitively
located” could not be appropriate in this circumstance and should be deemed in keeping with section
A.

Page 23

Page | 9 
In accordance with section b). The proposals at this time do not include for a full house type design
however section b) requires the application be “designed in such a way as to respect the local building
form and detail”, the proposals do demonstrate that the intension is to locate a single, 1.5 storey Eco
home with sufficient gardens and parking as per local policy without any disruption to the existing natural
or built environment. 
It should be highlighted that the proposals also demonstrate an enhancement to the existing natural
environment which should be deemed suitable for approval under this section. 
PART 2 - New dwellings need to be carefully grouped so as not to prejudice landscape character, or
quality, or site features or mature planting, and should meet North Lanarkshire Council’s standards for
environmental performance.
As previously confirmed, the house is to be located to the rear of the site where minimal clearing of
trees is to be undertaken. This is also to be offset with the planting of new trees on completion and
clearing and upkeep of the existing natural water environment to support any local wildlife. 
Any works deemed to “prejudice landscape character, or quality” are not applicable given the
boundaries to the site are to remain unchanged and the house to the rear hidden from the roads and
housing. 
Given the above and the apparent compliance with parts 1 and 2, we would submit that under section
H of SPG.08 the proposals as submitted are in accordance with and suitable new dwelling in the RIA. 
The proposals, albeit outline at this time demonstrate that in line with NSBE3 (b), the client wishes
to “enhance the natural heritage value” by offsetting the loss of any trees by replanting. The removal
of “invasive features” will be undertaken as part of any remedial works associated with the
recommendations of an ecological survey required as part of full planning (it is assumed this will be
conditioned).
This report will take cognisance of potential wildlife and their habitats (protected or non protected),
existing water courses and the removal of any invasive plant species found to be present on site. 
The proposals, at this time demonstrate accordance with NSBE3 (c), i.e. respect natural boundaries
(road, tree line, watercourse) and include works to reinforce and enhance boundaries and buffers. 
The natural boundaries are to remain untouched along the North, South, East and Western
Boundaries, out with any treatment of invasive plant species that may be required.
The existing water course with the site is to be cleared of all debris, albeit natural woodland debris to
ensure the environment is clean and running free and to promote the return any wildlife species. The
upkeep and maintenance of this natural environment will be undertaken by the client, something the
area currently does not benefit from providing an immediate enhancement to the natural
environment.

Page 24

Page | 10 
The proposals, at this time demonstrate accordance with NSBE3 (e), i.e.  avoid loss of prime
agricultural land (Classes 1, 2 and 3.1). 
Given the land is clearly not defined as “prime agricultural land” this should not be applicable. 
SECTION 5 – CONCLUSION 
5.1 Conclusions 
Proposals as described in the document take cognisance of local contextual environment and seeks to
comply with national and local policy guidance NSBE3 and SPG.08. 
• Compliance with NSBE 3, Sections B1 has been demonstrated.
• Compliance with NSBE 3, Sections B2, parts a, b, c & E have been demonstrated.
• Compliance with SOG.08, Sections H, parts 1a & 1b have been demonstrated.
• Compliance with SOG.08, Sections H, parts 2 has been demonstrated. 
We would submit that our proposals should provide sufficient information to allows NLC planning to
look favourably on out proposals and look to issue approval with conditions.

Page 25

No embedded text on this page.

Page 26

1
David
From: Regen & ES Planning <Planningenquiry@northlan.gov.uk>
Sent: 20 July 2022 13:29
To: David
Subject: 22/00232/PPP
Hello David, 
 
Apologies for the delay in coming back to you on this. 
 
It is middle of the holiday period and I have been on leave as well as other members of the team. There has also 
bene the adoption of the new local development plan which was unexpectedly agreed by the Scottish Government 
so various reports have had to be rejigged to use the correct policies of the LDP. 
 
A decision should be with you in due course as we have a slight backlog as a result of this. 
 
Regards 
 
Stewart MacCallum 
Planning Assistant 
 
*********************************************************************  
The disclaimer below is for this email and any files attached to it. When we refer to ‘this email’, it includes attachments.  
 
If you’ve received this email by mistake, please:  
‐ tell the sender straight away; and  
‐ delete it along with any other copies in your systems.  
 
Only use this email for its intended purpose. You MUST get our explicit permission to use, share, store or copy any part of it in any other way.  
 
The views or opinions in this email may not be those of North Lanarkshire Council. They DO NOT legally bind the council in any way.  
 
We check all email in our systems to make sure it’s in line with our policies. We may have to release this email – along with responses to it – under freedom of information 
legislation.  
 
We’ve checked this email for viruses. We recommend you do too. We’re NOT responsible for any damage or loss caused by receiving email from us.  
 
Read the full email disclaimer on our website: https://www.northlanarkshire.gov.uk/your‐council/communication‐and‐resources/email‐disclaimer. 
********************************************************************* 
 
This email has been scanned by iomartcloud. 
http://www.iomartcloud.com

Page 27

1
David
From: Stewart MacCallum <MacCallumS@northlan.gov.uk>
Sent: 11 August 2022 15:39
To: David
Subject: 22/00232/PPP Mill Road Allanton
Hello David, 
 
I apologise for the delay in responding to your enquiry. 
 
I have had a planning appeal for the last week to prepare which has taken up most of my time in the past week or 
so. I have  had to rejig the policies in my report as explained earlier. I would hope that we would have this 
determined at some point next week as I have been working on this today. 
 
I will advise you when this is determined but I would expect by the end of next week. 
 
Regards 
 
Stewart MacCallum 
Planning Assistant 
 
*********************************************************************  
The disclaimer below is for this email and any files attached to it. When we refer to ‘this email’, it includes attachments.  
 
If you’ve received this email by mistake, please:  
‐ tell the sender straight away; and  
‐ delete it along with any other copies in your systems.  
 
Only use this email for its intended purpose. You MUST get our explicit permission to use, share, store or copy any part of it in any other way.  
 
The views or opinions in this email may not be those of North Lanarkshire Council. They DO NOT legally bind the council in any way.  
 
We check all email in our systems to make sure it’s in line with our policies. We may have to release this email – along with responses to it – under freedom of information 
legislation.  
 
We’ve checked this email for viruses. We recommend you do too. We’re NOT responsible for any damage or loss caused by receiving email from us.  
 
Read the full email disclaimer on our website: https://www.northlanarkshire.gov.uk/your‐council/communication‐and‐resources/email‐disclaimer. 
********************************************************************* 
 
This email has been scanned by iomartcloud. 
http://www.iomartcloud.com

Page 28

1
David
From: Stewart MacCallum <MacCallumS@northlan.gov.uk>
Sent: 20 September 2022 11:51
To: David
Subject: RE: 22/00232/PPP
Importance: High
Dear Sir, 
 
Apologies for the delay in this matter.  
 
I will prioritise that his week, this is my fault and I apologise for the delay in this matter. 
 
Firstly can you please confirm that you would be happy to have a processing agreement to the 30th September 2022. 
It has passed its date but we are required to seek this when this happens and it is something I had meant to request 
earlier. I will however prioritise this and get this determined this week if possible. 
 
Regards 
 
Stewart MacCallum 
Planning Assistant 
 
From: David <David@osddesign.co.uk>  
Sent: 20 September 2022 11:20 
To: Stewart MacCallum <MacCallumS@northlan.gov.uk> 
Subject: FW: 22/00232/PPP 
 
 
Morning Stewart, further to your last update (noted below) are you in a position to provide us with an update on 
your application? 
Are the council minded to support and grant or at the very least, when can we expect a decision? 
 
Your prompt response would be greatly appreciated. 
 
 
Regards 
 
 
David J Aitcheson 
 
 
OSD Design Solutions Ltd 
International House 
Suite 1/J3 
Stanley Boulevard 
Hamilton International Technology Park 
Hamilton 
G72 0BN 
 
 
 
You don't often get email from david@osddesign.co.uk. Learn why this is important 
 
Caution: This email is from an EXTERNAL source. Please be cautious and evaluate before you click on links, open 
attachments, or provide credentials.

Page 29

1
David
From: Stewart MacCallum <MacCallumS@northlan.gov.uk>
Sent: 30 September 2022 16:00
To: David
Subject: RE: 22/00232/PPP
Importance: High
Hello David, 
 
I was off back end of last week and a few days this week. 
 
As I had mentioned previously we had switched over to the new Local Development Plan (LDP) 2022 which has 
similar and slightly different wordings for the relevant policies which we would assess the proposal against. This is 
one of the first proposals with the new plan  for housing we have had in the green belt/rural invest area etc and my 
Senior how is the person who would deal with my report has discovered an issue with ancillary 
guidance/information that we use in such cases. It is something he needs to clarify with our Team Leader. He is on 
leave this week which has prevented us from processing the application, he is though back next week and once they 
have had a discussion then we will now how we need to refer to certain parts of that policy . 
 
Again I apologise for this delay but its going to be next week before we can have this matter concluded. 
 
I will update you when I have been advised when we are able to issue our decision on this particular planning 
application. 
 
Regards 
 
Stewart MacCallum 
Planning Assistant 
 
From: David <David@osddesign.co.uk>  
Sent: 23 September 2022 09:46 
To: Stewart MacCallum <MacCallumS@northlan.gov.uk> 
Subject: Re: 22/00232/PPP 
 
 
Morning Stewart, are you in a position to issue a decision? 
We are very keen to get full planning and warrant submitted and the client is desperate now.  
 
Even a verbal decision would let us take this forward.  
 
Regards 
 
David J Aitcheson  
OSD Design Solution ltd 
From: Stewart MacCallum <MacCallumS@northlan.gov.uk> 
Sent: Tuesday, September 20, 2022 11:50:47 AM 
To: David <David@osddesign.co.uk> 
Subject: RE: 22/00232/PPP  
 
Caution: This email is from an EXTERNAL source. Please be cautious and evaluate before you click on links, open 
attachments, or provide credentials.

Page 30

1
David
From: Stewart MacCallum <MacCallumS@northlan.gov.uk>
Sent: 02 November 2022 16:03
To: David
Subject: 22/00232/PPP MILL ROAD, ALLANTON SINGLE HOUSE PLOT and 22/00184/COMP Siting of
Campervan in fixed location and hard surfacing parking area
Importance: High
Hello David, 
 
22/00232/PPP MILL ROAD, ALLANTON SINGLE HOUSE PLOT and 22/00184/COMP Siting of Campervan in fixed 
location and hard surfacing parking area 
 
Apologies for the delay in coming back to you on the current planning application 22/00232/PPP for a single house 
plot. The new Local Development Plan  being introduced has meant this is one of the first development in the 
greenbelt/rural investment area type applications  for housing type assessments and has involved new policies  and 
wordings from what had been used in the superseded Local Plan. 
 
I can advise that we are in a position to determine the application, however can I ask that you are agreeable to an 
extension of time in relation to a processing agreement. In this instance it would be 4th November 2022 as the 
earlier one had ran out in September. 
 
On a separate but potentially related note to your clients application, we have received an enforcement enquiry in 
regard to land which would appear to be under your clients ownership.  The area of land is at the edge of Mill Road 
across from a dwellinghouse and where the Scottish Power generator base is located, at the very east of your clients 
plot. The planning application ownership would suggest that the land in question is within their ownership on the 
drawings.  In this instance it would appear that the land has had trees removed, materials used to form a hard 
surfaced area and it would appear to be used for parking a very large touring camper van. Firstly we would look to 
confirm this is under your clients ownership. If as expected this is the case then we would look to establish what is 
going on in regard to this in regard to the purpose and how long they are proposing to use this/what is the reason. 
We would then have to make a judgement as to how we view this activity and how we would assess this matter in 
regards to enforcement . 
 
I trust this information is of use to you and I await your response. 
 
Regards 
 
Stewart MacCallum 
Planning Assistant 
 
*********************************************************************  
The disclaimer below is for this email and any files attached to it. When we refer to ‘this email’, it includes attachments.  
 
If you’ve received this email by mistake, please:  
‐ tell the sender straight away; and  
‐ delete it along with any other copies in your systems.  
 
Only use this email for its intended purpose. You MUST get our explicit permission to use, share, store or copy any part of it in any other way.  
 
The views or opinions in this email may not be those of North Lanarkshire Council. They DO NOT legally bind the council in any way.  
 
We check all email in our systems to make sure it’s in line with our policies. We may have to release this email – along with responses to it – under freedom of information 
legislation.  
 
We’ve checked this email for viruses. We recommend you do too. We’re NOT responsible for any damage or loss caused by receiving email from us.

Page 31

1
David
From: Stewart MacCallum <MacCallumS@northlan.gov.uk>
Sent: 03 November 2022 08:50
To: David
Subject: RE: 22/00232/PPP MILL ROAD, ALLANTON SINGLE HOUSE PLOT and 22/00184/COMP Siting of
Campervan in fixed location and hard surfacing parking area
Importance: High
Hello David, 
 
Thank you for confirming the agreement to extend time for the application. 
 
In regard to the application it would unfortunately be up for refusal as it does not comply with the relevant policies 
of the Local Development Plan as it  does not meet justification for erecting a house in the rural investment 
area/greenbelt area. Development criteria for development of  house plots in the greenbelt/rural investment area is 
quite restrictive and requires to comply with what is viewed as a cluster or have extremely strong justification to 
support such proposals. You will be able to view the delegated report  shortly once the application has been 
determined and refusal notice uploaded. This goes through why the proposal was unacceptable and in particular the 
review of this against the Local Development Plan (LDP) relevant policies. 
 
You should receive your decision today or tomorrow. You would obviously have the chance to appeal this via the 
local review and information regarding this process  is provided in the decision notice. 
 
In regard to the enforcement matter, is it best to contact your client or yourself regarding this matter. If you can 
please confirm. If your client wishes to be contacted directly is there a postal address that they would use for 
correspondence? 
 
The motorhome appears to be untaxed/non mot and would not be `mobile`  in the sense its `parked` and can`t be 
moved around legally on the road. An initial DVLA check suggests its SORN currently. Ultimately its similar to a static 
caravan except on wheels. By what your email suggests this is something which would be longer term and 
effectively similar to siting a caravan in the greenbelt/rural investment area. This is something I need to discuss with 
my colleagues as to how we would view/deal with this particular matter. 
 
I trust this information is of use to you. 
 
Regards 
 
Stewart MacCallum 
Planning Assistant 
 
 
 
From: David <David@osddesign.co.uk>  
Sent: 02 November 2022 16:21 
To: Stewart MacCallum <MacCallumS@northlan.gov.uk> 
Subject: RE: 22/00232/PPP MILL ROAD, ALLANTON SINGLE HOUSE PLOT and 22/00184/COMP Siting of Campervan 
in fixed location and hard surfacing parking area 
 
 
 
Caution: This email is from an EXTERNAL source. Please be cautious and evaluate before you click on links, open 
attachments, or provide credentials.

Page 32

No embedded text on this page.

Page 33

No embedded text on this page.

Page 34

No embedded text on this page.

Page 35

WASTEWATER
SOLUTIONS
PREMIUM SEWAGE TREATMENT PLANT FOR DOMESTIC USE
FROM THE MARKET LEADERS IN WASTEWATER TREATMENT.
Wastewater Solutions

Page 36

Kingspan Klargester
For over 60 years, Kingspan Klargester has designed and manufactured
innovative ways to treat, pump, separate and recycle wastewater.
We pioneered the world’s first GRP septic tank and the patented RBC
(Rotational Biological Contactor) BioDisc® wastewater treatment
system – leading change in our sector and setting industry standards
around the world.
As established global market leaders, we offer a diverse range
of innovative and 100% compliant wastewater treatment solutions
for domestic, commercial and industrial applications. We give you
relevant advice and support throughout the wastewater treatment
purchasing process based on our in-depth local knowledge and expertise.
The Wastewater Management Experts
Kingspan Klargester are the wastewater management experts with
over 60 years of innovation and knowledge. Our mission is to design
and manufacture premium tried and tested wastewater management
solutions on a global scale whilst offering one of the largest and most
technologically advanced wastewater ranges available.
Operating in 85 countries worldwide, we offer a global distribution
network backed by experienced sales and technical teams. Our
support teams provide focused customer service from delivery
scheduling to consultancy and installation guidance. We give you
the confidence of support over the lifetime of the product and beyond.
2 3
EXPERTISE
❱		With over 60 years’ experience
delivering high performance
and reliable wastewater
treatment systems worldwide,
you can trust Kingspan
Klargester.
PREMIUM
❱	 BioDisc® is one of the only
premium sewage treatment
systems in the world to use the
patented Rotating Biological
Contactor technology.
This ensures continued high
performance and hassle-free
sewage treatment.
SERVICE
❱		We pride ourselves on a
quality customer experience
from comprehensive on-site
assessments to professional
installation options and expert
after sales care.
Wastewater Solutions
85
COUNTRIES
WORLDWIDE
WORLD LEADER
in quality wastewater
management solutions
Kingspan Klargester BioDisc® wastewater treatment plant
Our Kingspan Klargester BioDisc® sewage treatment range benefits from a wealth
of industry experience and knowledge that allowed us to bring to market the first
Rotational Biological Contactor treatment system over 40 years ago.
The patented BioDisc® is engineered to treat wastewater to the highest level of standards.
In terms of ongoing service and maintenance, it offers one of the best returns on
investment compared to other treatment processes. Each BioDisc® is designed to ensure
100% compliance with industry requirements, including national and international
regulations such as BS EN12256.
The aim of BioDisc® is simple – quality product and quality customer service for total
peace of mind.
KINGSPAN KLARGESTER
BUILT ON LEADERSHIP
60 YEARS OF
EXPERTISE
REQUEST
A FREE SITE
VISIT FROM OUR
EXPERT TEAM.
klargester@kingspan.com
01 296 633 000

Page 37

KEY BENEFITS
4 5
Wastewater Solutions
PROTECTING YOUR
HOME AND THE
ENVIRONMENT
In an increasingly regulated world with new Environment Agency and SEPA standards, it’s more important than
ever to choose a sewage treatment plant that delivers peace of mind by guaranteeing safe and reliable treatment
of wastewater.
BioDisc® from Kingspan Klargester is built on the back of 60 years’ experience and offers the following benefits:
LOW RUNNING COSTS
The robust patented design of the BioDisc® treatment plant offers complete
peace of mind. With low running costs and minimal servicing and maintenance
required, the BioDisc® is a high-quality lifetime investment that helps safeguard
the health of you and your family.
FULLY COMPLIANT SOLUTION
BioDisc® is tested and certified to European standard EN 12566, the European
standard for small treatment plants and was awarded its Performance
Certificate by delivering high levels of pollution removal (up to 97.5%).
As a homeowner you can rest assured that the BioDisc® will operate optimally
at all times, saving you time, money and hassle.
EXPERTISE AND KNOWLEDGE
BioDisc® is backed by 60 years’ of expertise and technical knowledge. Our
expert team is on hand to guide you on the best choice of sewage treatment
system for your home. 
ULTIMATE
RELIABILITY
GUARANTEEING
LONG TERM
PERFORMANCE
KINGSPAN KLARGESTER
BUILT ON LEADERSHIP
KEY BENEFITS
4 EASY STEPS TO THE PERFECT 
WASTEWATER TREATMENT SOLUTION
Step 1
Contact us and we’ll
arrange for a local
Kingspan Klargester
expert to visit your home
for a full site assessment,
should you need it.
Step 2
Our professional team
will work with you to
help choose the correct
BioDisc® model.
Step 3
A Kingspan professional can
be arranged to commission
and activate your tank.
Step 4
We offer tailored service
and maintenance packages
for your BioDisc® treatment
plant.
*Subject to stock levels and other conditions. Free delivery from our distribution hubs.
OF EXPERTISE
OVER
60
YEARS
60
FREE
NATIONWIDE
HI-AB DELIVERY
WITHIN
3 WORKING DAYS*
*Mainland UK only

Page 38

BioDisc
®
from Kingspan Klargester
For further technical information and videos on
the BioDisc® treatment plant visit our website at
kingspanklargester.com
KINGSPAN KLARGESTER
BUILT ON LEADERSHIP
The Rotational Biological Contactor (RBC) is central to the operation of each Kingspan
Klargester BioDisc®. It supports a biologically active film or biomass onto which aerobic
micro-organisms, naturally found in sewage, become established. Natural breakdown
of sewage can then occur as described below.
1
2 3
4
PRIMARY SETTLEMENT TANK
Wastewater and sewage flows into the
primary settlement tank where the large
solids are retained for future removal.
FIRST STAGE BIOLOGICAL TREATMENT
The liquor and fine solids then flow into the
Biological Treatment Zone 1 where the first
stage of treatment occurs.
SECOND STAGE BIOLOGICAL TREATMENT
The liquor is then fed forward at a controlled
rate into Biological Treatment Zone 2 for
further cleaning.
FINAL SETTLEMENT TANK
The clean liquid passes into the final settlement
tank where it can be discharged to ground
or water course.
6 7
BioDisc
®
HOW IT WORKS
Wastewater Solutions
ROTATING BIOLOGICAL
CONTACTOR (RBC)
The RBC comprises banks
of vacuum formed polypropylene
media supported by a steel shaft.
This is slowly rotated by a low
energy consumption electric
motor and drive assembly.
OF EXPERTISE
OVER
60
YEARS
OF EXPERTISE
OVER
60
YEARS
3 421
UNIT SIZE
SINGLE HOUSE MULTIPLE HOUSES
BA BA-X BB BC
Population Equivalent 1 House
up to 4 bedrooms
1 House
up to 7 bedrooms
2 House
up to 8 bedrooms
3 House
up to 12 bedrooms
Overall diameter / Width (mm) 1995 1995 1995 2450
Standard drain inlet (mm) 750* 750* 750* 600†
Standard outlet (mm) 835 835 835 685
Depth from invert to base (mm) 1400 1400 1400 1820
Pipework Diameter (mm) 110 110 110 110
Sludge storage period (Approx) 12 Months 9 Months 6 Months 7 Months
Standard power supply Single Phase Single Phase Single Phase Single Phase
Motor rating 50W 50W 50W 75W
Weight (tonnes) standard units 0.388 0.418 0.418 0.650
* BA-BB 450/1250 † BC 11000

Page 39

9
Wastewater Solutions
CHOOSING THE CORRECT
SEWAGE TREATMENT PLANT 
FOR YOUR HOME
OF EXPERTISE
OVER
60
YEARS
8
BioDisc
®
from Kingspan Klargester
For further technical information and videos on
the BioDisc®  treatment plant visit our website at
kingspanklargester.com
KINGSPAN KLARGESTER
BUILT ON LEADERSHIP
WHAT DETERMINES
MY CHOICE OF SEWAGE
TREATMENT PLANT?
The BioDisc® is technically engineered with high performance
and quality in mind. Each component of the BioDisc® has been
manufactured and chosen with care, to ensure continuous operation
of a tried and tested wastewater treatment process.
What else do I need to consider when choosing my sewage treatment
plant?
•  The size of treatment plant needed 
We’ll take you through the best practice guidelines from British
Water’s ‘Flows and Loads’ sizing criteria to help you make the
correct choice.
•  Ground conditions around the plant      
We’ll establish whether it’s a wet or dry site to determine  
the choice of backfill used on the tank.
• Wastewater discharge options
With the new Environmental Agency regulations for domestic
plants, it’s now more important than ever to take responsibility
for wastewater discharges.
•  Ground conditions around the plant 
Kingspan Klargester offer a range of drain invert level options 
to match your site conditions.
✔
✔
✔
✔
OF EXPERTISE
OVER
60
YEARS
At Kingspan Klargester we offer a full range
of options and professional insight to help you
choose the perfect sewage treatment plant for
your home.
All our robust BioDisc® models cater for properties
housing between 4-16 people. The premium BioDisc®
sewage treatment system is available in four sizes
for all types of domestic applications.
For single house applications we offer the BA
and BAX models and, for multiple homes, the
Kingspan Klargester BB and BC BioDisc® models
are ideal. 
Because various inlet and outlet options are
available, we carry out a free comprehensive site
assessment to ensure the correct system model
and size for your home.

Page 40

Wastewater Solutions
REED
BEDS
Klargester BioDisc® treatment plants use a reed bed filtration process to further enhance
the quality of the effluent migrating into drainage fields or a surrounding watercourse.
CUSTOMER
SUPPORT
We stand by the quality and performance of Kingspan
Klargester products and our support doesn’t stop once
your tank is installed. We’re on standby 24/7 with guidance
on servicing and maintenance and offer tailored warranty
options. Our trained professional support team is only
a phone call away.
Peace of mind with extended warranty options
We offer an extended and tailored warranty or bond on
your sewage treatment plant to suit your needs and budget.
This cost effective package offers the benefits of scheduled
maintenance inspections to ensure your system performs
at optimum levels at all times.
Customer support when you need it 
Our friendly local customer service team are on hand with
professional advice. We operate a dedicated helpline on
01296 633 000 and a support email address for customers
on klargester@kingspan.com
Service and maintenance
We recommend that you service your BioDisc sewage
treatment plant once a year. Under new Environment Agency
regulations, it’s now your responsibility to ensure smooth
running of your plant.  Our in house Service department offer
a range of service packages including Gold, Silver and Bronze
to cater for all homeowners’ needs. To find out more about
how you could benefit from a tailored service package from
Kingspan, call us on 0844 846 0500 or email
helpingyou@kingspan.com.
Benefits
❱		Tertiary treatment for new
applications with tight discharge
consents
❱		Satisfies new building regulations
❱			Improved effluent quality for
existing works
❱		Very low maintenance
❱		Aesthetically pleasing and
environmentally friendly
❱		Easy to install and maintain
10 11
OF EXPERTISE
OVER
60
YEARS
DESIGN
Advanced Patented design delivers superior performance
Pre-fabricated to ensure correct sizing
Modules designed with a hydraulic gradient across
the length of the units
Performance tested in Germany to EN12566-3
in combination with a Part 3 plant
Modular system comprising of:
· Two individual reed beds = single house application
· Four individual reed beds = two house application
Adjustable outlet weir allows water level control
One piece GRP moulding installed flush to the ground
Reeds and GRP beds supplied. Washed pea gravel,
‘growing’ media by others (not included)
Effluent discharge is typically improved by at least
50%, providing reduced BOD and suspended solids
Provides rooting zone depth of 600mm (required
by Phragmites Australis)
Contact your expert local Kingspan Klargester team today
Our experienced local Kingspan Klargester product experts are on hand with
professional advice on all aspects of your sewage treatment system, including
sizing and installation.
Book your no obligations site assessment from the global experts in wastewater
treatment, Kingspan Klargester. Contact us today on +44 (0) 1296 633 000.
You can also book your visit online at Kingspanklargester.com
OF EXPERTISE
OVER
60
YEARS
KINGSPAN KLARGESTER
BUILT ON LEADERSHIP

Page 41

UK
College Road North,
Aston Clinton, Aylesbury,
Buckinghamshire, HP22 5EW
T: +44 (0) 1296 633000
F: +44 (0) 1296 633001
E: klargester@kingspan.com
W: www.kingspanklargester.com
Ireland
Kingspan Klargester
Unit 1a, Derryboy Road
Carnbane Business Park
Newry, BT35 6QH
T: +44(0)28 3026 6799
E: klargesterinfo@kingspan.com
W:  www.kingspanklargester.com/ie
GB: 0844 846 0500
NI: 028 3836 4600 
ROI: 048 38364600
helpingyou@kingspan.com
www.kingspanenviro.com/service
Scotland
T: +44 (0) 1355 248484
Germany
Kingspan Klargester
Siemensstr. 12a, D-63263
Neu-Isenburg, Deutschland
T: +49 (0) 6102 3686700
E: klargesterde@kingspan.com
W: www.kingspanklargester.com/de
Norway / Sweden
Kingspan Miljø AS
Skiveien 42, 1410 Kolbotn,
Norway
T: +47 22 02 19 20
E: klargesterno@kingspan.com
W: www.kingspanklargester.com/no
W: www.kingspanklargester.com/se
Disclaimer: We take every care and precaution to ensure that information in this document is accurate at the point of publish
but with continuous product development the details given in this document are subject to alteration without notice .
Kinspan Klargester - Biodisc Domestic Brochure – English- Feb 2016

Page 42

kingspan.co.uk/klargester
Klargester 
Product Guide
The Klargester range of fully integrated
wastewater management, surface water
and rainwater harvesting solutions
Water Management Solutions

Page 43

—
2
Water Management Solutions
About Kingspan
Global Reach
Trusted Water Management Solutions
Kingspan, manufacturers of the
Klargester Product Range, are the water
management experts with over 60 years
of innovation and knowledge. We design
and manufacture tried and tested water
management solutions on a global scale
for the leisure, public, hospitality, transport
and domestic sectors whilst offering one
of the largest and most technologically
advanced wastewater ranges available.
Our technical support teams provide
focused customer service from delivery
scheduling to consultancy and installation
guidance. We give you the confidence of
support over the lifetime of the product
and beyond, in your local area.
Operating in over 85
countries worldwide, we
offer a global distribution
network backed by
experienced local sales
and technical teams.
UK & Ireland
Asia—South East
Melbourne
USA
Poland
South America
France
Germany
Italy
Norway
Sweden
Middle East
Spain
Sydney
Brisbane
Turkey
Nationwide
Distribution
Locally 
Accessible
—
2
Water Management Solutions

Page 44

Expert Technical
Support
We stand by the quality and performance
of Kingspan water management solutions
and our support doesn’t stop once your
tank is installed.
Our world class design consultancy is
complemented by engineering expertise
and advice as well as service throughout
your commercial or industrial water
management project.
We use the latest design technology
to produce drawings of extremely high
quality. Our project management
process is a step-by-step one, to ensure
the very best experience and results. It
covers everything from system sizing,
product selection and system design to
calculations, manufacturing, installation
and delivery.
Our advice also spans water management
specification, design, product application
and integration with building regulations,
code compliance and site work installation
practices to meet the most demanding
effluent qualities, flow rates and 
discharge consents.
Contact our technical team today for
expert advice and information on any of
our water management solutions.
Email: water@kingspan.com
Kingspan’s support doesn’t stop once you have
purchased the product. Our expert team are
here to help you with technical, sales and delivery
enquiries. We are dedicated to our customers and
pride ourselves on top class customer service.
—
3

Page 45

—
4
Water Management Solutions
Regional
Installations
Dundee
Wing
London
Co. Fermanagh
Kettering
Co. Louth
Clifford
Goole
Liverpool
Manchester
Kent
Manufactured in the
UK and Ireland, the
Klargester Product Range
is supported by our
nationwide network of
dedicated external Area
Sales Managers.
We offer free site visits to discuss project
specific requirements and provide a
detailed written report and specification to
recommend the best water management
solution for your project.
We also provide on-site installation
assistance when required and help you
with formal discussions with Building
Control, Local Planning departments,
The Environment Agency/SEPA,
architects and consultants.
To arrange your free site survey contact us
now on 01296 633033 or email 
water@kingspan.com
Kingspan 
operates in over
85 countries
worldwide, with
currently over
5 million water
management
system installa-
tions. Take a look
at a selection of
our case studies
for the Klargester
Product Range.

Page 46

—
5
Multi-Housing Development 
Dundee, Scotland
A complex sewage treatment and surface
pumping solution to meet the varying
needs of multiple housing.
The Castlefields Inn 
Clifford, England
BioDisc Commercial sewage treatment
plant providing an efficient water
management solution.
Elite Office Furniture
Goole, England
Surface water separators, foul, effluent
and crude sewage pump stations, grease
trap and BioFicient commercial system.
Everton FC (Training Ground)
Liverpool, England
Modular BioFicient commercial system
including fuel/oil separators for a complete
waste water management solution.
Primark Distribution Centre 
Kettering, England
Modular BioFicient commercial system for
multi-million pound distribution centre.
Barn Conversion
Wing, England
Domestic BioDisc sewage treatment
plant, ensuring a safe, odour-free
environment.
Social Housing Installation 
Co. Louth, Ireland
Rainwater harvesting solution used
to flush the WCs in each home. The
system is fully integrated with the
main plumbing, easing demand on
the mains supply.
Supermarket Carpark 
London, England
Bypass separator, NSBE50, to 
assist in decontamination of surface
water drainage.
Thanet Earth 
Kent, England
Four vertical pumping stations to aid
water management for a complex green
house development.
UK
Manchester City FC 
Manchester, England
Oil separators for its all-important surface
water drainage system.
UK
UK
IRE Marble Arch Caves 
Co. Fermanagh, N. Ireland
Grease separator and BioDisc sewage
treatment plant work together giving
optimum performance and extremely low
running costs.
IRE
UK
UK
UK
UK
UK UK

Page 47

—
6
Water Management Solutions
02
First Stage Biological Treatment
The liquor and fine solids then flow into the Biological Treatment
Zone 1 where the first stage of treatment occurs.
01
Primary Settlement Tank
Wastewater and sewage flows into the primary settlement tank
where the large solids are retained for future removal.
Klargester BioDisc®
Domestic Sewage
Treatment Plant
Product Benefits
∙ Utilises Rotating Biological Contactor
technology.
∙ Low running costs.
∙ Low level visibility with a lockable child-
proof cover – safe for children and pets.
∙ Delivers better than 95% pollution
removal.
∙ 10 year warranty options available
when purchased with a service and
maintenance plan.
∙ Supplied with a control panel and alarm.
∙ Managed Flow System.
∙ Totally silent in operation.
∙ The most stable process in the market.
∙ Controls the discharge volume.
The Rotational Biological Contactor
The RBC is central to the operation of
each Klargester BioDisc®. It supports a
biologically active film or biomass onto
which aerobic micro-organisms, naturally
found in sewage, become established.
Natural breakdown of sewage can then
occur as described below.
The Klargester Domestic
BioDisc® is engineered
to treat wastewater
to the highest level of
standards and offers one
of the lowest lifetime
costs compared to other
treatment processes.
First Stage 
Biological Treatment
Final Settlement
Tank
Second Stage 
Biological Treatment
Primary
Settlement Tank
Control Panel
Low Voltage
Beacon

Page 48

—
7
03
Second Stage Biological Treatment
The liquor is then fed forward at a controlled rate into Biological
Treatment Zone 2 for further cleaning.
04
Final Settlement Tank
The clean liquid passes into the final settlement tank where it
can be discharged to ground or water course.
Noise Free
Technical Specifications
Performance
and Compliance
›  Certified to
European
Standard BS EN
12566 Part 3.
›  Performance
certified to
achieve 10mg/l
BOD, 15mg/l
SS and 3.8mg/l
ammonia.
›  Fully marked
in line with the
CPR 2013.
Applications:
The Klargester Domestic BioDisc® BA–BC range is suitable for a
range of applications including:
Model Reference BA BA-X BB BC
Population Equivalent (Std Flow) 6 9 12 18
Maximum Daily BOD (kg) 0.36 0.54 0.72 1.08
Maximum Daily Flow (m3) 1.2 1.8 2.4 3.6
Ø/Width (mm) Ø1995 Ø1995 Ø1995 Ø2450
Length (mm) - - - -
Inlet Invert depth (mm) 450/750/1250 450/750/1250 450/750/1250 600/1100
Depth Below Inlet Invert (mm) 1400 1400 1400 1820
Outlet Invert Depth (mm) 1315 1315 1315 1735
Overall Height (mm) 2160/2460/2960 2160/2460/2960 2160/2460/2960 2825/3325
Height to Rim of Cover (mm) 1945/2245/2745 1945/2245/2745 1945/2245/2745 2485/2985
Empty Weight (kg) 310/325/380 310/325/380 335/350/405 650/750
Standard Power Supply 1 phase 1 phase 1 phase 1 phase
Motor Rating - 1 Phase (Watts) 50 50 50 75
Full Load Current 1 Phase (amps) 0.51 0.51 0.51 1.1
Optional Power Supply N/A N/A N/A 3 phase
Motor Rating - 3 Phase (Watts) N/A N/A N/A 90
Full Load Current 3 Phase (amps) N/A N/A N/A 0.38
Sludge Return Pump Rating (watts) 250 250 250 250
Pumped Outlet Available on BA, BA-X,  BB models.
Single & 
Multiple Homes Small Offices Light Industrial
Premises
FarmsBarn
Conversions

Page 49

—
8
Water Management Solutions
01
Primary Chamber
Raw sewage gravitates to the unit where it is received in the primary settlement zone.
Here, gross solids and other social debris settle to the bottom of the tank where they
remain until the tank requires desludging. Settled sewage is displaced from primary
zone and enters the first of two sequential moving aerated media reactors.
Klargester BioFicient® 
Domestic Sewage
Treatment Plant
Performance
and Compliance
›  BS EN 12566 Part
3 tested and
approved.
›  Industry leading
NH4 (ammonia)
removal.
›  Fully   marked
in line with the
CPR 2013.
The Klargester BioFicient
®
treatment plant provides
a reliable and effective
solution for domestic
applications without
access to mains
drainage. Suitable for
homes with up to 30
people, the BioFicient is
manufactured from high
quality materials and
uses the latest treatment
technology to deliver
a high level of water
discharge quality.
Product Benefits 
∙ Shallow Dig.
∙ New low energy compressor.
∙ Low level visibility with a lockable child-
proof cover – safe for children and pets.
∙ Suitable for installation in traffic areas
(structural advice required).
∙ Supplied with a control panel and alarm.
∙ Easy to set up and operate.
∙ Integral pump option available for
BioFicient 1-4.
Primary
Settlement Tank
Final Settlement 
Tank
BioZone
Control Panel
Low Voltage
Beacon

Page 50

—
9
Model Reference BioFicient 1 BioFicient 2 BioFicient +2 BioFicient 3 BioFicient 4 BioFicient 5 BioFicient 6
Population Equivalent 6 8 10 10 15 20 30
Overall Diameter (mm) 1,540 1,420 2,010 1,420 1,920 1,920 1,920
Length (mm) 2,500 3,760 3,189 3,760 3,230 4,390 6,220
Depth (mm) 1,794-2,104 1,830/2,330/
2,830 2,785 1,830/2,330/
2830
2,300/2,800/
3,300
2,300/2,800/
3,300
2,300/2,800/
3,300
Inlet Invert (mm)* 500-810/
500-810*
500/1,000/
1,500 700-1,500 500/1,000/
1,500
500/1,000/
1,500
500/1,000/
1,500
5,00/1,000/
1,500
Outlet Invert (mm) 600-910/
555-865*
600/1,100/
1,600* 800-1600 600/1,100/
1,600*
630/1,130/
1,630*
630/1,130/
1,630
630/1,130/
1,630
Material MDPE GRP MDPE GRP GRP GRP GRP
Blower Ratings 50W 95W 95W 95W 115W 180W 225W
Cover sizes 700 1,500/900 700 1,500/900 1,500/900+600** 1,500/900+600** 1,500/900+
600**
Technical Specifications
Note: Optional inlet depth down to 1800mm
*BioFicient IPS models only (Outlet Depth 320mm)   |  **BioFicient 4, 5, 6 has two shafts.
Control Panel
Included
02
Biozone 1 & 2
Solids are broken down by air agitated media in the Biozone.
Media and liquid circulation in the Biozone is achieved through
the use of a compressor and diffuser, which introduces fresh air
into each compartment. The liquor is constantly re-circulated and
contacts the moving media and as it does so, it is purified by the
micro organisms growing on the surface of the media and within
the moving liquor. Excess growth of biomass is shed as solid
particles into the liquor.
03
Final Settlement Tank
Where fine solids are settled out. The Final
effluent is discharged via either gravity
outlet or IPS (Integral Pump System)
chamber. With regulatory approval, it is
suitable for discharge to a watercourse or
drainage field.
Single & 
Multiple Homes
Small Offices Light Industrial
Premises
FarmsBarn
Conversions
Applications:
The Klargester Domestic BioFicient® 1–6 range is suitable for use
across the following applications:

Page 51

—
10
Water Management Solutions
Klargester BioTec® 
Domestic Sewage
Treatment Plant
The Klargester BioTec®
sewage treatment
system is ideal for single/
multiple houses and
employs the well proven
aerobic biological trickling
filter process for the
treatment of sewage.
Product Benefits 
∙ No mechanical or electrical
components within the plant – low
running and maintenance costs.
∙ Low level visibility with a lockable
child-proof duty cover – safe for
children and pets.
∙ Easy to install and maintain with
annual desludging.
∙ PPFDS and HLA Alarms as standard.
∙ Control Panel
∙ Beacon
Distributor
Inlet
Primary
Settlement
Air lift
Blower Air
Duct
* Blower is externally
mounted.
Media
Outlet
Performance
and Compliance
›  Certified to BS
EN 12566 Part 3.
›  Assured
performance
of 20mg/l
BOD, 30mg/l
S.S., 20mg/l
Ammonia.
›  Fully  marked
in line with the
CPR 2013.
01
Coarse solids are filtered and retained for
gradual breakdown.
02
The resulting liquid is continuously
distributed over a plastic suspended filter
by an integral lift, powered by a remotely
sited blower.
Incorporating the well-proven aerobic
biological process, the BioTec® sewage
treatment plant has a three-stage process.
Control
Panel
Low Voltage
Beacon

Page 52

—
11
Product Benefits 
∙ No mechanical or electrical
components within the plant – low
running and maintenance costs.
∙ Low level visibility with a lockable
child-proof duty cover – safe for
children and pets.
∙ Easy to install and maintain with
annual desludging.
Model Reference BioTec® 1 BioTec® 1 IPS BioTec® 2 BioTec® 2 IPS BioTec® 3 BioTec® 3 IPS BioTec® 4 BioTec® 4 IPS
Population Equivalent 6 6 12 12 18 18 25 25
Outside Diameter (m) 1.9 1.9 1.9 1.9 2.7 2.7 2.7 2.7
BOD Load (kg/day) 0.36 0.36 0.72 0.72 1.1 1.1 1.5 1.5
Weight Empty (kg) 195 220 217 260 445 471 470 495
Depth (m) 2.2 2.2 2.7 2.7 2.6 2.6 2.6 2.6
Inlet Invert (m) 1.0* 1.0* 1.0* 1.0* 1.0* 1.0* 1.0* 1.0*
Inlet Invert to Base (m) 1.2 1.2 1.7 1.7 1.6 1.6 1.6 1.6
Outlet Invert (m) 1.1 0.605 1.1 0.605 1.1 0.605 1.1 0.655
Motor Rating (watts) 60 60 60 60 150 150 150 150
Technical Specifications
Easy to Install
Economy Version Available
The Klargester Domestic BioTec®
Economy Range is available for
requirements of up to 18PE and features
the following Product Benefits:
* There are two depths of inlet in the range 1.0m and 1.5m.
IPS - Integral Pump System
03
The solids are allowed to settle and under normal domestic conditions, effluent of
20mg/l BOD, 30mg/l S.S., 20mg/l Ammonia can be achieved.
Single & 
Multiple Homes
Small Offices
Light Industrial
Premises
Farms
Barn
Conversions
Applications:
The Klargester Domestic BioTec® Range is
suitable for a range of applications, including:

Page 53

Water Management Solutions
—
12
A reed bed is a
filtration process used
in conjunction with
a Klargester sewage
treatment system to
further enhance the
quality of the effluent
migrating into a drainage
field or surrounding
watercourse.
Technical Specifications
Klargester
Reed Beds
Model Reference Population Equivalent Length (mm) Width (mm) Depth (mm) No. Required Outlet Size (mm)
HRB006 6 2500 800 800 2 110
HRB012 12 2500 800 800 4 110
Product Benefits 
∙ Tertiary treatment for new applications
with tight discharge consents.
∙ Satisfies new building regulations.
∙ Improved effluent quality for 
existing works.
∙ Very low maintenance.
∙ Aesthetically pleasing and
environmentally friendly.
∙ Easy to install and maintain.
∙ Effluent discharge is typically improved
by at least 50% providing reduced BOD
and suspended solids.
2500
800
Outlet from
treatment plant
Outlet from
treatment plant
800
How it works

Page 54

—
13
Environmental Regulators and British
Water have developed the system selection
process below, to help in guiding you
through the process to choose the correct
system to meet your requirements.
Selecting the 
Correct Solution
To ensure selection of
the correct sewage
treatment and disposal
method to meet your
requirements, expert
advice should be sought.
In all instances a sewage
treatment plant should
be considered as the first
option.
Site Assessment Connect to SewerIs a gravity 
connection possible?
Pump Chamber
Septic Tank or
Sewage Treatment Plant
Do you have sufficient land 
space for drainage fluid?
Sewage Treatment PlantDo you have access 
to a water course?
Cesspool
Do you have access to 
a mains server? YES
YES
YES
YES
NO
NO
NO
NO
Vp 
< 12 or >100
Vp 
12 - 100
Did you know?
If you have a septic
tank that discharges
directly to a surface
water you will need
to replace or upgrade
your treatment
system by 1 January
2020, or when you
sell your property if
before this date.
Environment Agency
— General Binding
Rules
Regulations
Compliant

Page 55

—
14
Water Management Solutions
Applications
The Klargester Alpha and Gamma septic
tank ranges, each comprise three sizes and
are typically suitable for applications not
connected to mains drainage including:
Performance
& Compliance
›  Performance
tested to BS
EN 12566
Part 1 
requirements.
›   Fully  
marked in line
with the CPR
2013.
Klargester 
Alpha Septic 
Tank
Klargester Alpha tanks
provide a reliable and
economic solution for
homes not connected
to mains drainage.
Model Reference Volume (L) No. People 
(150 Ltrs/head/day)
Overall Diameter
(mm) Height (mm) Standard Inlet
Invert (mm)
Standard Outlet
Invert (mm)
STS02810 2800 5 2075 2599/3099 1000/1500 1050/1550
STS03810 3800 12 2075 2810/3310 1000/1500 1050/1550
STS04610 4600 17 2084 2984/3484 1000/1500 1050/1550
Technical Specifications
Basic septic tanks only retain solids and
discharge effluent of low quality. The
installation will not contaminate any
ditch, stream or other watercourse.
However, many authorities in the UK
prohibit their use. In all instances a
sewage treatment system should be
considered as a first option.
Septic tanks may be installed, subject to
consent, in applications where:
∙ Soil is of suitable porosity.
∙ Installation complies with Building
Regulations (Approved Document H).
∙ The installation will not contaminate any
ditch,stream or other watercourse.
—
Product Benefits 
∙ Made from composite GRP - strong, light,
and watertight.
∙ Press moulded shape provides wide,
squat, form which makes the tank easy to
install and handle.
∙ Stable base for storage.
∙ Lifting eyes are provided for lifting and
positioning within the excavation.
Did you know?
If you have a septic tank
that discharges directly
to a surface water you
will need to replace or
upgrade your treatment
system by 1 January
2020, or when you sell
your property if before
this date.
Environment Agency —
General Binding Rules
Single and 
Multiple Homes
Golf Course
Toilet Facilities
Churches

Page 56

—
15
Klargester
Gamma Septic
Tank
The Klargester Gamma
tank is an affordable
solution for domestic
applications with an
efficiency rating of 99.97%
– an industry benchmark.
Manufactured from tough polyethylene,
the tank is robust and lightweight which
makes it easy to handle and install.
Due to its design features, the Gamma
tank is the perfect solution where a
shallow dig installation is required,
reducing installation time and costs.
—
Product Benefits 
∙ Manufactured from robust, impact
resistant, high quality polyethylene.
∙ Strong, easy to move and simple to install.
∙ Less excavation costs, less soil disposal
and less backfill material. 
∙ Wide neck for easy access for annual
desludging.
∙ Trimmable neck to suit site.
Model Reference Volume (L) No. People (150
Ltrs/head/day)
Width
(mm)
Length
(mm)
Height
(mm)
Standard Inlet
Invert (mm)
Standard Outlet
Invert (mm)
Depth
(mm)
GST028 2800 5 1130 2480 1755 - 2255 550-1050 550-1050 2255
GST035 3500 10 1180 3000 1755 - 2255 550-1050 550-1050 2255
GST040 4000 13 1215 3360 1755 - 2255 550-1050 550-1050 2255
Technical Specifications
Performance
& Compliance
›  99.97% effi-
ciency rating.
›    BS EN 
12566 Part 1 
approved.
›   Fully 
marked in line
with the CPR
2013.
Mobile Homes
Farms
Temporary 
Work Offices and
Welfare Facilities
Churches

Page 57

—
16
Water Management Solutions
Klargester Sigma
Septic Tank
The Klargester Sigma
shallow dig septic tank is
designed to reduce both
installation time and cost.
The range is available in
various sizes suitable for
properties with dig height
restrictions.
Product Benefits 
∙ Made from GRP - strong and durable for
ultimate reliability.
∙ Robust and simple to install, reducing on
site installation time.
∙ Less excavation costs, less soil disposal
and less backfill material required.
∙ Light, watertight and chemically
resistant.
∙ Robust, weather proof for guaranteed
durability, giving you value for money.
Technical Specifications
Performance
and Compliance
›   Certified to BS
EN 12566 Part 1
›   Fully  marked
in line with the
CPR 2013.
Model Reference Volume (L) No. People 
(150 Ltrs/head/day)
Overall 
Diameter (mm) Length (mm) Standard Inlet
Invert (mm)
Standard Outlet
Invert (mm) Depth (mm)
STH028 2800 5 1225 2955 500 530 1627/1587*
STH038 3800 12 1225 3895 500 530 1617/1577*
STH057 5700 24 1425 4275 500 530 1826/1786*
STH071 7150 34 1920 3225 500 550 2290
STH091 9150 47 1920 3960 500 550 2290
*110mm diameter pipework/ 160mm diameter pipework
Applications
Klargester Sigma septic tanks and below
ground water storage tanks and cesspools,
offer a solution for applications not
connected to mains drainage including:
Single and 
Multiple Homes
Golf Course
Toilet Facilities
Churches

Page 58

—
17
Nominal Litres Capacity (Gallons) Length (mm) Diameter (mm)
18,000 3960 4317 2620
22,000 4889 5073 2620
26,000 5720 5837 2620
34,000 7480 7376 2620
46,000 10,120 9684 2620
54,000 11,880 11,222 2620
59,000 12,968 11,991 2620
63,000 13,860 12,760 2620
71,000 15,620 14,295 2620
79,000 17,380 15,833 2620
Technical Specifications
Klargester Below Ground
Water Storage Tanks 
and Cesspools
The range of Klargester
below ground storage
tanks provide a reliable
solution for the collection
and retention of sewage
(cesspool), surface
water, veterinary / animal
waste, firefighting
reservoirs and rainwater
harvesting reservoirs.
The advanced design of the Klargester
below-ground storage tanks ensures
consistent high performance, even in the
toughest environmental conditions.
Product Benefits
∙ Easy to install with minimal on site
installation time.
∙ Designed in accordance with BS6297,
ensuring that you meet all building
regulations.
∙ High level alarm available for complete
peace of mind.
∙ Lockable manhole cover for 
ultimate security.
Mobile Homes
Farms
Temporary 
Work Offices and
Welfare Facilities
Churches

Page 59

—
18
Water Management Solutions
Performance & Compliance
›   Odour free – tested and fully
approved in accordance with
BSEN13725.
›   Designed for applications
selected in compliance with
British Water Code of Practice
Flows and Loads.
›   100% compliance with
industry requirements across
commercial sectors, including
national and international
regulations such as BS
EN12255 and EN12566-3 (up
to 50 PE).
Primary 
Settlement Tank
Second Stage
Biological Treatment
Final 
Settlement Tank
First Stage
Biological Treatment
01
Primary Settlement Tank
This is the initial stage of treatment and simply involves the
retention of coarse solids present in raw sewage and wastewater for
subsequent gradual breakdown. BioDisc® features one chamber to
ensure efficient operation with a flow balancing facility.
02
First Stage Biological Treatment
The liquor and fine solids then flow into the first stage of
Biological Treatment. A unique managed flow system ensures
peak performance by smoothing variable loads.
Klargester BioDisc®
Commercial Sewage
Treatment Plant
Delivered as a single,
packaged system, the
Klargester BioDisc® RBC
range (up to 300PE),
offers low running
costs due to its unique
design and operational
efficiencies.
Product Benefits
∙ Unique RBC technology.
∙ Tried and tested technology, offers
robust and efficient water management
treatment.
∙ Low running costs.
∙ Noise free.
∙ Fully removable lid for easy desludging.
∙ Fully packaged system, delivered direct
on site.
∙ Bespoke technical support offered from
our in-house technical teams.

Page 60

—
19
03
Second Stage Biological Treatment
The liquor is then fed forward at a
controlled rate into Biological Treatment
stage 2 for further cleaning. This process
ensures the whole media area available is
utilised ensuring maximum efficiency.
04
Final Settlement Tank
The surplus micro-organisms continuously slough off the discs and are carried forward
to the final settlement where they settle out as a humus sludge, leaving a clear
treated effluent to be discharged to ground or water course. The settled humus sludge
is returned to the Primary Settlement Tank by the sludge return pump under timer
control. The sludge return pump also removes any floating scum which helps to keep
the final settlement tank working efficiently.
Single Piece
System
Technical Specifications
Model Reference BD BE BF BG BH BJ BK BL BM BN
Maximum Daily BOD (kg) 1.5 2.1 3 4.2 4.5 6 7.5 9 13.5 18
Maximum Daily Flow (m3) 5 7 10 14 15 20 25 30 45 60
Ø/Width (mm) 2450 2450 2450 2450 2450 2450 2450 2450 2450 2450
Length (mm) 3340 3340 4345 5235 7755 7755 7755 7755 10420 13100
Inlet Invert depth (mm) 600/1100 600/1100 600/1100 600/1100 600/1000 600/1000 600/1000 600/1000 600/1000 600/1000
Depth Below Inlet Invert
(mm) 1820 1820 1820 1820 1790 1790 1790 1790 1790 1790
Outlet Invert Depth (mm) 1735 1735 1720 1720 1640 1640 1640 1640 1640 1640
Overall Height (mm) 2825/3325 2825/3325 2825/3325 2825/3325 2830/3230 2830/3230 2830/3230 2830/3230 2830/3230 2830/3230
Height to Rim of Cover
(mm) 2485/2985 2485/2985 2485/2985 2485/2985 2490/2890 2490/2890 2490/2890 2490/2890 2490/2890 2490/2890
Empty Weight (kg) 1100/1200 1200/1300 1315/1465 1660/1810 3000/3020 3100/3120 3200/3220 3300/3320 4200/4250 5500/5650
Standard Power Supply 1 phase 1 phase 1 phase 1 phase 1 phase 1 phase 1 phase 1 phase 1 phase 1 phase
Motor Rating - 1 Phase
(Watts) 75 75 120 180 250 250 370 370 550 2 x 370
Full Load Current 1 Phase
(amps) 1.1 1.1 1.3 1.6 1.5 1.5 2.35 2.35 2.8 2 x 2.35
Optional Power Supply 3 phase 3 phase 3 phase 3 phase 3 phase 3 phase 3 phase 3 phase 3 phase 3 phase
Motor Rating - 3 Phase
(Watts) 90 90 120 180 250 250 370 370 550 2 x 370
Full Load Current 3 Phase
(amps) 0.38 0.38 0.42 0.63 0.88 0.88 1.35 1.35 2.8 2 x 1.35
Sludge Return Pump
Rating (watts) 250 250 250 250 250 250 250 250 250 250

Page 61

—
20
Water Management Solutions
The Klargester modular RBC system 
is designed for applications with 
higher populations.
The RBC comprises of a complete modular
system containing the RBC units along
with primary and final settlement tanks.
Both RBC units and tanks can be
increased in numbers or size to make a
flexible system for an expanding or phased
population growth.
Each unit is supplied as a 250PE unit
and further units supplied depending on
population requirements. 
Primary and final settlement tanks can
be sized for the intended end population
or additional tanks can be supplied in the
future and fed into the system.
Each of the units can be linked to create
a complete sewage treatment system. 
The feed to each RBC can be controlled
independently to give further flexibility.
The RBC unit measures 6.7 metres long
x 2.2 metres wide x 2.4 metres high. The
size of primary and final settlement tanks
will vary with each customer application
and site location.
Klargester Modular BioDisc®
Sewage Treatment Plant
The new Klargester
Modular BioDisc®
containerised sewage
treatment plant
range, is designed with
scalability in mind for
populations of between
300PE and 2500PE.
Modular BioDisc®
A flexible
engineered
solution, for above
or below ground
installation, the
Modular BioDisc
solution is ideal for 
off-mains sites
with seasonal
loads due to
its unique flow
management
activity.
Total flexibility with a
unique modular RBC
system
Primary
Settlement
Tank
Final
Settlement
Tank
Primary
Settlement
Tank
Final
Settlement
Tank
Primary
Settlement
Tank
Final
Settlement
Tank
A Brand New
Solution for
2018

Page 62

—
21
More Scalability
The commercial BioDisc
range offers a totally scalable
solution. For applications larger
than 300PE, we offer a brand
new containerised Modular
solution, with flexibility to suit
sites with populations up to
2500PE.
More Efficiency
Our unique flow management
system delivers an improved
biological process and overall
treatment efficiency, by
catering for seasonal changes
to flows and loads. Adaptive
forward feed management
allows for total flexibility for
seasonally fluctuating sites.
More Control
Featuring local alarms and
Kingspan’s intelligent SmartServ
remote monitoring solution,
the challenges associated
with remote performance
monitoring are greatly
reduced. Our fully integrated
connectivity package allows
for greater control over your
assets, saving time and money
when it comes to servicing your
treatment plant.
More Savings
Kingspan’s unique to market
solar back up option is the
ideal solution for customers
in remote locations. Our solar
panels can cater for up to
100% of the used energy on
any site, offering a potential
payback of three years on a
typical BioDisc commercial
system.
Model Reference Daily Flow (l/day) Daily Load (kg/BOD/day) Length(mm) Width(mm) Height(mm) Weight(kg) Motor Power
Modular BioDisc
250PE 50,000 15 6,700 2,210 2,400 5,000 1.1 Kw/400v
Technical Specifications
Max daily flow based on 200 L/Person/Day, system PE will vary by site flow rate per person.
Available in our 
Modular System
Sectional Media 
Modules
Flow Management
Process
Rotor Support
Bearings
Strapping
Points
Rotor Support
Bearings

Page 63

—
22
Water Management Solutions
Klargester BioFicient®
Commercial Sewage
Treatment Plant
Product Benefits
∙ Adaptable to specific consent
requirements including ‘Total Nitrogen’.
∙ Low head loss.
∙ Minimal footprint area and visual
impact.
∙ Variable invert options (0.5 - 2.0 m).
∙ May be installed in trafficked areas
(subject to loading).
∙ Low maintenance.
∙ Alarm protected.
02
Biozone 1
The liquor enters the first stage of Biological treatment where
the active bacteria within the fluidized bed begin to break down
organic solids, majority of BOD removal occurs here.
01
Primary Settlement Chamber
This is the initial stage of treatment and simply involves
the retention of coarse solids present in raw sewage and
wastewater for subsequent gradual breakdown. BioFicient
features two chambers to ensure efficient operation with a flow
balancing facility.
The Klargester BioFicient
commercial sewage
treatment plant is
designed with efficiency
in mind. It offers reliable
performance using tried
and tested technology to
ensure consistently high
effluent quality.
Applications:
The BioFicient range is suitable for a range
of applications including:
Campsites
Public sector
Transport Hospitality
Offices
Multi-housing
developments
Leisure
Performance and
Compliance
›     Compliant with EN-
12255 and EN12566-
3 (up to 50 PE).
›    Designed and sized
in accordance with
British Water Code
of Practice Flows
and Loads but can
be sized to suit local
site conditions.
—
2.6 diameter
BioFicient is also
available as an
alternative model.
—

Page 64

—
23
Primary Settlement
Chamber
Biozone 1
Technical Specifications
Biozone 2
Final Settlement 
Tank
Model Reference 17H 23H 34H 38H 42H 47H 55H 67H 80H
A Overall Length (m) 7.4 9.3 7.4 8.1 8.9 9.7 11.2 13.5 15.8
B Overall Width (m) 1.9 1.9 1.9 1.9 1.9 2.8 2.8 2.8 2.8
C Height (m)
560mm Inlet / 860mm Outlet Invert* 2.28 2.28 3.02 3.02 3.02 3.02 3.02 3.02 3.02
1060mm Inlet / 1360mm Outlet Invert* 2.78 2.78 3.52 3.52 3.52 3.52 3.52 3.52 3.52
1560mm Inlet / 1860mm Outlet Invert* 3.28 3.28 4.02 4.02 4.02 4.02 4.02 4.02 4.02
2060mm Inlet / 2360mm Outlet Invert* 3.78 3.78 4.52 4.52 4.52 4.52 4.52 4.52 4.52
D Diameter (m) 1.8 1.8 1.8 1.8 1.8 2.6 2.6 2.6 2.6
Volume (m3) 17 23 34 38 42 47 55 67 80
Weight Approx (kg) 1200 1450 3000 3200 3400 3800 4200 4700 5400
Inlet / Outlet Diameter (mm) 160 160 160 160 160 160 160 160 160
Maximum Flow (m3/day) Models 8 11 15 20 25 30 40 50 60
Retention Time (hrs) 76 66 51 43 39 35 31 31 30
03
Biozone 2
Within the second stage of Biological treatment the second
fluidized bed continues to clean the liquor giving further BOD
reduction along with removal of nitrogen.
04
Final Settlement Tank
A natural by-product of biological treatment is humus sludge
and this is separated for further treatment. The treated effluent
is discharged via the outlet or to disinfection stage.
Available in our 
Modular System

Page 65

—
24
Water Management Solutions
Choosing the
Right Separator
Kingspan has a specialist
team who provide expert
technical assistance in
selecting the appropriate
Klargester Separator for
your application.
The chart below gives guidance to aid
selection of the appropriate type of fuel/
oil separator for use in surface water
drainage systems which discharge into
rivers and soakaways.
Is there a risk of oil contaminating the
drainage from the site?
Risk of infrequent
light contamination
and potential for
small spills only, e.g.
car park
Source control SuDS
must be considered
and incorporated
where suitable
If not suitable
Separator not
required
Risk of regular
contamination
of surface water
runoff with oil 
and/or risk of larger
spills, e.g.
vehicle
maintenance area,
goods vehicle
parking or vehicle
manoeuvring5
Drainage will also
contain dissolved
oils, detergents or
degreasers such as
vehicle wash water
and trade effluents,
e.g. industrial sites
Fuel oils are
delivered to
and dispensed on
site, e.g. retail
forecourts
Very low risk of oil
contamination,
e.g. roof water
YES
YES
YES YES YES
YES
YES YES YES NO
Bypass separator
with alarm required
Class I if discharge
to surface water2,3
Full retention
separator with
alarm required
Class I if discharge
to surface water2
Class II if discharge
to foul sewer1
The use of SuDS should be considered at all sites and they should be incorporated where suitable. 
SuDS can be used to polish the effluent from these separators before it enters the environment6
Source control
SuDS should be
considered where
possible
Trade effluents must
be directed to the 
foul sewer1
It may need to pass
through a separator
before discharge to
sewer for removal of
free oils
Full retention
‘forecourt’
separator with
alarm required
Class I if discharge
to surface water2
Class II if discharge
to foul sewer1,4
Clean water should
not be passed
through the
separator unless
the size of the
unit is increased
accordingly
1 You must seek prior
permission from your local
sewer provider before you
decide which separator to
install and before you make
any discharge.
2 You must seek prior
permission from the relevant
environmental body before
you decide which separator
to install.
3 In this case, if it is considered
that there is a low risk of
pollution a source control
SuDS scheme may be
appropriate.
4 In certain circumstances,
the sewer provider may
require a Class 1 separator
for discharges to sewer
to prevent explosive
atmospheres from being
generated.
5 Drainage from higher
risk areas such as vehicle
maintenance yards and
goods vehicle parking areas
should be connected to
foul sewer in preference to
surface water.
6 In certain circumstances,
a separator may be one of
the devices used in the SuDS
scheme. Ask us for advice.

Page 66

—
25
Full retention separators
are used in high risk
spillage areas such as
fuel distribution depots,
vehicle workshops 
and scrap metal 
recycling yards.
Each full retention separator design
includes the necessary volume
requirements for:
∙ Oil separation capacity
∙ Oil storage volume
∙ Silt storage capacity
∙ Coalescer (Class 1 units only)
∙ Automatic closure device
Our full retention separators treat the whole
of the specified flow.
Klargester
Full Retention
Separators
NSF RANGE
Model 
Reference
Flow
(l/s)
Drainage Area
(m2) PPG-3
(0.018)
Storage
Capacity (Ltrs) Length
(mm)
Diameter
(mm)
Manhole
Cover
Dimensions
(mm)
Base
Inlet
Invert 
(mm)
Base to
Outlet 
Invert 
(mm)
Min
Inlet
Invert
(mm)
Standard
Pipework
Diameter
(mm)Silt Oil
Polyethylene Chamber Construction
NSFP003 3 170 300 30 1700 1350 600 1410 1335 550 160
NSFP006 6 335 600 60 1700 1350 600 1410 1335 550 160
GRP Chamber Construction
NSFA010 10 555 1000 100 2610 1225 600 1050 1000 500 200
NSFA015 15 835 1500 150 3910 1225 600 1050 1000 1000 200
NSFA020 20 1115 2000 200 3200 2010 600 1810 1760 1000 315
NSFA030 30 1670 3000 300 3915 2010 600 1810 1760 1000 315
NSFA040 40 2225 4000 400 4640 2010 600 1810 1760 1000 315
NSFA050 50 2780 5000 500 5425 2010 600 1810 1760 1000 315
NSFA065 65 3160 6500  650  6850 2010  600 1810 1760 1000 315
NSFA080 80 4445 8000 800 5744 2820 600 2500 2450 1000 315
NSFA100  100 5560 10000  1000  6200 2820 600 2500 2450 1000 400
NSFA125  125 6945 12500 1250 7365 2820  600 2500 2450 1000 450
NSFA150  150 8335 15000  1500 8675 2820  600  2500 2450 1000 525
NSFA175  175 9725 17500 1750  9975  2820  600  2500 2450 1000 525
NSFA200  200  11110  20000  2000 11280  2820 600 2500 2450  1000 600
NSFA210 210 11667 21000 2100 11991 2820 600 2550 2450 1000 600
NSFA225 225 12500 22500 2250 12760 2820 600 2550 2450 1000 600
NSFA240 240 13333 24000 2400 13527 2820 600 2550 2450 1000 600
NSFA255 255 14167 25500 2550 14295 2820 600 2550 2450 1000 600
NSFA270 270 15000 27000 2700 15065 2820 600 2550 2450 1000 600
NSFA285 285 15833 28500 2850 15833 2820 600 2550 2450 1000 600
* Some units have more than one access shaft – diameter of largest shown.
Technical Specifications
Full Alarm
Range Available
Performance and Compli-
ance
›  Kingspan were one of the first
UK manufacturers to have the
required range certified to EN
858-1 in the UK.
›  The NSF number denotes the
flow at which the separator
operates.
›  Approved by The British Stan-
dards Institute (BSI) in relation
to flow and process perfor-
mance, meeting effluent
quality requirements of 
EN 858-1.

Page 67

Water Management Solutions
Bypass separators are
used when it is considered
an acceptable risk to not
provide full treatment for
very high flows, such
as, where the risk of a
large spillage and heavy
rainfall occurring at
the same time is small.
Typical applications
include surface
carparks, roadways and
lightly contaminated
commercial areas.
Performance & Compliance
›  Fully compliant and tested to
EN 858-1.
›  Bypass separators are
tested by British standards
institute (BSI).
›  Certified flow and process
performance assessing
effluent qualities to the
requirements of EN 858-1.
›  The unit is designed to treat
the ‘first flush’ - 10% of
peak flow. The calculated
drainage areas served by
each separator are indicated
according to the formula
given by PPG3 NSB =
0.0018A(m2).
›  Class I separators are
designed to achieve a
concentration of less than
5mg per litre.
Klargester
Bypass
Separators
NSB RANGE
Model 
Reference
Flow
(l/s)
Peak
Flow
Rate
(l/s)
Drainage 
Area(M2)
Based on UK
rainwater flow
Storage
Capacity (Ltrs) Length
(mm)
Diameter
(mm)
Access
Shaft
Diameter
(mm)
Base
Inlet
Invert 
(mm)
Base to
Outlet 
Invert 
(mm)
Standard
Fall Across 
(mm)
Min
Inlet
Invert
(mm)
Standard
Pipework
Diameter
(mm)**Silt Oil
Polyethylene Chamber Construction
NSBP003 3 30 1670 300 45 1700 1350 600 1420 1320 100 500 160
NSBP004 4.5 45 2500 450 60 1700 1350 600 1420 1320 100 500 160
NSBP006 6 60 3335 600 90 1700 1350 600 1420 1320 100 500 160
GRP Chamber Construction
NSBE010 10 100 5560 1000 150 2069 1220 750 1450 1350 100 700 315
NSBE015 15 150 8335 1500 225 2947 1220 750 1450 1350 100 700 315
NSBE020 20 200 11111 2000 300 3893 1220 750 1450 1350 100 700 375
NSBE025 25 250 13890 2500 375 3575 1420 750 1680 1580 100 700 375
NSBE030 30 300 16670 3000 450 4265 1420 750 1680 1580 100 700 450
NSBE040 40 400  22222  4000 600 3230 1920 600 2185 2035 150 1000 500 
NSBE050 50 500  27778 5000  750  3960  1920  600 2185 2035 150 1000 600
NSBE075 75 750 41667 7500 1125 5841 1920  600 2235 2035 200 950 675
NSBE100  100 1000 55556  10000  1500  7661 1920  600 2235 2035 200 950 750
NSBE125  125 1250  69444  12500 1875 9548  1920  600 2235 2035 200 950 750
* Some units have more than one access shaft – diameter of largest shown  |  ** Larger pipework available on request.
† Achieves concentration of less than 5MG/L
Technical Specifications
Concentration
Less Than
5
MG/L
—
26
Product Benefits
∙ Light and easy to install.
∙ Inclusive of silt storage volume.
∙ Fitted inlet/outlet connectors.
∙ Vent points within necks.
∙ Oil alarm system available (required by
EN 858-1 and PPG3).
∙ Extension access shafts for deep inverts.
∙ Maintenance from ground level.
∙ GRP or polyethylene construction
(subject to model).

Page 68

Klargester 
Forecourt 
Separators
Fuel & Oil
Separator Alarms
Forecourt separators
are used to intercept
hydrocarbon pollutants
such as petroleum and
oil to prevent their entry
to the drainage system.
Typical applications
include petrol filling
station forecourts and
car breaker yards.
Performance and Compliance
∙ Operation ensures that the flow cannot
exit the unit without first passing
through the coalescer assembly.
∙ In normal operation, the forecourt
separator has sufficient capacity to
provide storage for separated pollutants
within the main chamber, but is also
able to contain up to 7,600 litres of
pollutant arising from the spillage of a
fuel delivery tanker compartment on the
petrol forecourt.
∙ The separator has been designed with an
automatic closure device to ensure that oil
cannot exit the separator in the event of a
major spillage, subsequently the separator
should be emptied immediately.
Installation
∙ The unit should be installed on a suitable
concrete base slab and surrounded with
concrete or pea gravel backfill.
∙ If the separator is to be installed within a
trafficked area, then a suitable cover slab
must be designed to ensure that loads are
not transmitted to the unit.
∙ The separator should be installed and
vented in accordance with Health and
Safety Guidance Note HS(G)41 for 
filling stations.
∙ Subject to Local Authority requirements.
British European Standard EN 858-1 and
Environment Agency Pollution Prevention
Guideline PPG3 requires that all separators
are to be fitted with an oil level alarm
system. It should be installed and calibrated
by a suitably qualified technician so that
it will respond to an alarm condition when
the separator requires emptying.
Product Benefits
∙ Easily fitted to existing tanks.
∙ Excellent operational range.
∙ Visual and audible alarm.
∙ Additional telemetry option.
Technical Specifications
Separator
Class
Backfill
Type
Total
Capacity
(Ltrs)
Drainage
Area (m2)
Peak Flow
Rate (l/s)
Length
(mm)
Diameter
(mm)
Access
Shaft 
Diameter
(mm)
Base Inlet
Invert
(mm)
Base to
Outlet 
Invert 
(mm)
Standard
Fall Across 
(mm)
Min Inlet
Invert
(mm)
Standard
Pipework
Diameter
(mm)
Empty
Weight
(kg)
I Concrete 10000 720 15 3915 2020 600 2180 2130 50 600 160 620
I Concrete 10000 115 20 3915 2020 600 2180 2130 50 600 200 620
Expert Technical
Advice
HOW THEY WORK
An alarm system with up to 3 probe
sensors is installed within the separator
automatically monitoring the levels of oil,
silt and liquid within.
If excessive levels are reached the alarm
activates to notify of excessive liquid levels. 
Alarm allows you time to take corrective
action ensuring the safe and economic
operation of separators preventing oil
passing through the separator and polluting
watercourses which may result in expensive
fines and clean up costs.
DO YOU POSE AN OIL CONTAMINATION RISK?
DO YOU STORE OIL ON SITE?
DO YOU HAVE A CAR PARK FOR MORE THAN 50 CARS?
DO YOU HAVE GOODS VEHICLE MOVEMENTS?
INTERCEPTORS TRAP OIL AND OTHER HYDROCARBONS THAT HAVE ENTERED DRAINS
PREVENTING POLLUTION INCIDENTS.
PPG3 STATES: INTERCEPTORS MUST HAVE A VISUAL AND AUDIBLE WARNING WHEN OIL
REACHES 90% STORAGE VOLUME 
EUROPEAN STANDARD EN858-1-2: SUGGESTS SEPARATORS ARE FITTED WITH AN ALARM
THAT WARNS OF EXCESSIVE LIQUID LEVELS.
EXCESSIVE SILT, OIL OR LIQUID LEVELS WILL PREVENT THE INTERCEPTOR FROM WORKING
EFFECTIVELY  ALLOWING OIL TO PASS THROUGH AND POLLUTE WATERCOURSES.
MONITORING OF
INTERCEPTORS /
SEPARATORS
YES  THEN IT’S LIKELY YOU HAVE INTERCEPTORS ON SITE.
DID YOU KNOW:
It costs on average £600 to empty
an interceptor. Interceptors
need emptying ONLY if oil or silt
exceeds 90% storage volume or
every five years.
There is now a more effective
and efficient way of monitoring
interceptors.
These systems can pay for
themselves within one year
ALARM INDICATES
HIGH WATER LEVEL
ALARM INDICATES
HIGH SILT LEVEL
ALARM INDICATES
HIGH OIL LEVEL
HOW THEY WORK
An alarm system with up to 3 probe
sensors is installed within the separator
automatically monitoring the levels of oil,
silt and liquid within.
If excessive levels are reached the alarm
activates to notify of excessive liquid levels. 
Alarm allows you time to take corrective
action ensuring the safe and economic
operation of separators preventing oil
passing through the separator and polluting
watercourses which may result in expensive
fines and clean up costs.
DO YOU POSE AN OIL CONTAMINATION RISK?
DO YOU STORE OIL ON SITE?
DO YOU HAVE A CAR PARK FOR MORE THAN 50 CARS?
DO YOU HAVE GOODS VEHICLE MOVEMENTS?
INTERCEPTORS TRAP OIL AND OTHER HYDROCARBONS THAT HAVE ENTERED DRAINS
PREVENTING POLLUTION INCIDENTS.
PPG3 STATES: INTERCEPTORS MUST HAVE A VISUAL AND AUDIBLE WARNING WHEN OIL
REACHES 90% STORAGE VOLUME 
EUROPEAN STANDARD EN858-1-2: SUGGESTS SEPARATORS ARE FITTED WITH AN ALARM
THAT WARNS OF EXCESSIVE LIQUID LEVELS.
EXCESSIVE SILT, OIL OR LIQUID LEVELS WILL PREVENT THE INTERCEPTOR FROM WORKING
EFFECTIVELY  ALLOWING OIL TO PASS THROUGH AND POLLUTE WATERCOURSES.
MONITORING OF
INTERCEPTORS /
SEPARATORS
YES  THEN IT’S LIKELY YOU HAVE INTERCEPTORS ON SITE.
DID YOU KNOW:
It costs on average £600 to empty
an interceptor. Interceptors
need emptying ONLY if oil or silt
exceeds 90% storage volume or
every five years.
There is now a more effective
and efficient way of monitoring
interceptors.
These systems can pay for
themselves within one year
ALARM INDICATES
HIGH WATER LEVEL
ALARM INDICATES
HIGH SILT LEVEL
ALARM INDICATES
HIGH OIL LEVEL
HOW THEY WORK
An alarm system with up to 3 probe
sensors is installed within the separator
automatically monitoring the levels of oil,
silt and liquid within.
If excessive levels are reached the alarm
activates to notify of excessive liquid levels. 
Alarm allows you time to take corrective
action ensuring the safe and economic
operation of separators preventing oil
passing through the separator and polluting
watercourses which may result in expensive
fines and clean up costs.
DO YOU POSE AN OIL CONTAMINATION RISK?
DO YOU STORE OIL ON SITE?
DO YOU HAVE A CAR PARK FOR MORE THAN 50 CARS?
DO YOU HAVE GOODS VEHICLE MOVEMENTS?
INTERCEPTORS TRAP OIL AND OTHER HYDROCARBONS THAT HAVE ENTERED DRAINS
PREVENTING POLLUTION INCIDENTS.
PPG3 STATES: INTERCEPTORS MUST HAVE A VISUAL AND AUDIBLE WARNING WHEN OIL
REACHES 90% STORAGE VOLUME 
EUROPEAN STANDARD EN858-1-2: SUGGESTS SEPARATORS ARE FITTED WITH AN ALARM
THAT WARNS OF EXCESSIVE LIQUID LEVELS.
EXCESSIVE SILT, OIL OR LIQUID LEVELS WILL PREVENT THE INTERCEPTOR FROM WORKING
EFFECTIVELY  ALLOWING OIL TO PASS THROUGH AND POLLUTE WATERCOURSES.
MONITORING OF
INTERCEPTORS /
SEPARATORS
YES  THEN IT’S LIKELY YOU HAVE INTERCEPTORS ON SITE.
DID YOU KNOW:
It costs on average £600 to empty
an interceptor. Interceptors
need emptying ONLY if oil or silt
exceeds 90% storage volume or
every five years.
There is now a more effective
and efficient way of monitoring
interceptors.
These systems can pay for
themselves within one year
ALARM INDICATES
HIGH WATER LEVEL
ALARM INDICATES
HIGH SILT LEVEL
ALARM INDICATES
HIGH OIL LEVEL
—
27

Page 69

Water Management Solutions
Klargester Grease
Separators
Klargester Grease
Separators are an
effective and hygienic
method of separating
fat and grease from
wastewater flow. Grease
Separators are designed
for restaurants, hotels,
public houses, canteens
and similar applications.
Key Standard Features
∙ Greatly reduces drain blockages, for
maximum operational efficiency.
∙ Helps improve performance of septic
tanks and field drains and achieve best
results.
∙ Prevents contamination of small sewage
treatment plants, reducing risk of
breakdown.
∙ Protects mains drainage system from
grease blockages.
How it works
Grease separators allow fats and
grease to naturally separate out from
water, allowing their removal prior to
the wastewater reaching the drainage
system. The separator should be installed
close to the source of contamination
before any foul waste can enter the
drainage flow and to suit the expected
liquid temperature.
Grease Range Sizing Table
Technical Specifications
—
28
Meals Per Day Standard Meal Fast Food Fine Cuisine
40 NSG01 NSG01 NSG02
60 NSG02 NSG02 NSG02
80 NSG02 NSG02 NSG04
100 NSG02 NSG04 NSG04
200 NSG04 NSG06 NSG09
300 NSG06 NSG09 NSG14
500 NSG09 NSG14 NSG18
700 NSG14 NSG18 NSG24
900 NSG18 NSG24 —
1,300 NSG24 — —
Model Reference
Dimensions (mm)
Flow Rates Shipping Height (mm) Capacity (L)
Approx Weight (Kg) Fall Across
The Unit (mm)Length Width Empty Full
NSG01 1320 750 1LPS 1100 500 70 570 75
NSG02 1620 1100 2LPS 1175 1000 90 1090 75
NSG04 2072 1224 4LPS 1570 2000 120 1860 70
NSG06 3018 1224 6LPS 1570 3000 160 2820 70
NSG09 3895 1224 9LPS 1570 4000 190 3760 70
NSG14 4418 1422 14LPS 1745 6000 215 5535 70
NSG18 3231 1917 18LPS 2120 8000 300 7162 70
NSG24 4386 1917 24LPS 2120 11000 380 9885 70
Easy to Install

Page 70

Klargester Washdown 
and Silt Units
Klargester Washdown
and Silt units can be
used in areas such as
car wash and other
cleaning facilities that
discharge directly into
a foul drain, which
feeds to a municipal
treatment facility.
How it works
As contaminated water passes through
the separation chamber, it is retained
long enough to allow solids to sink to the
bottom of the unit. Our design uses a
maximum of 6 minutes hydraulic retention
time, at the flow rate given. The separator
water is then able to discharge safely.
The nature of the silt varies depending on
either the ground or surface receiving the
flow. These aspects should be considered
when selecting the size of the unit in
relation to the flow being treated.
If emulsifiers are present, the discharge
must not be allowed to enter an NS unit.
Applications
These units can be used to serve vehicle
wash down areas and car wash facilities,
although it should be noted that the
prime function of such separators is for
the removal of silt. Typical locations using
wash down separators are: car wash, tool
hire depots, truck cleansing, construction
compounds cleansing points.
Locations requiring silt separators are:
highly silted sites where NS separators are
used, i.e. works constructions sites and
temporary work compounds.
Our Washdown and Silt Separators are
manufactured from durable, rot and
corrosion proof glass reinforced polyester
combining lightweight with outstanding
strength. The units are delivered complete
with inlet and outlet pipework as well as
factory fitted access shafts to ensure
quick and easy installation on site.
Model Ref
Total
Capacity
(Ltrs)
Max.rec.
Silt (Ltrs)
Max. 
Flow
Rate
(L/S)
Length
(MM)
Diameter
(MM)
Access
Shaft Di-
ameter
(MM)
Base
Inlet
Invert 
(MM)
Base To
Outlet 
Invert 
(MM)
Stan-
dard Fall
Across 
(MM)
Min Inlet
Invert
(MM)
Standard
Pipework
Diameter
(MM)
Approx.
Empty
(Kg)
W1/010 1000 500 3 1123 1225 460 1150 1100 50 500 160 60
W1/020 2000 1000 5 2074 1225 460 1150 1100 50 500 160 120
W1/030 3000 1500 8 2952 1225 460 1150 1100 50 500 160 150
W1/040 4000 2000 11 3898 1225 460 1150 1100 50 500 160 180
W1/060 6000 3000 16 4530 1440 600 1360 1310 50 500 160 320
W1/080 8000 4000 22 3200 2020 600 2005 1955 50 500 160 585
W1/100 10000 5000 27 3915 2020 600 2005 1955 50 500 160 680
W1/120 12000 6000 33 4640 2020 600 2005 1955 50 500 160 770
W1/150 15000 7500 41 5435 2075 600 1940 1890 50 500 160 965
W1/190 19000 9500 52 6865 2075 600 1940 1890 50 500 160 1200
Technical Specifications
—
29

Page 71

—
30
Water Management Solutions
Klargester Compact
Pumping Stations
Our proven range of
compact pump stations
can be used for effluent
or sewage and are easy
to install.
Quick to install and easy to maintain,
Klargester pump stations are the ideal
solution for outbuildings and extensions,
cellars, pool houses and external WCs.
They can be used for effluent or 
sewage, depending on the pump,
distance and height.
Product Benefits
∙ Non-return valves and outlet pipe
compression coupling  as standard.
∙ 3 pump options; effluent low head,
effluent high head and sewage vortex.
∙ Service and maintenance plans available
to prolong the life of the pump systems.
∙ Complete pre-fabricated solution ready
for installation.
∙ Fully automatic.
Technical Specifications
Chamber Size (mm) Capacity (Ltrs) Tank Material Control Panel Alarm Pump Type
610 x 700 200 GRP N/A Optional Single
560 x 1,650 400 GRP N/A Optional Single
All Klargester pumping
stations are suitable for
pumping waste water
effluent and sewage
in accordance with
BS 756-2.
They are also designed in line with
Building Regulations for Foul Drainage.
Your system size will depend on the
type of waste you need to manage,
your distance from the sewer and the
difference in levels.
For expert advice, to help you select
the correct system, please contact our
specialist team on 01296 633033
The key factors to size your system are
as follows:
∙ Application: domestic, residential or 
commercial.
∙ Material application: sewage, effluent or
surface water.
∙ Inlet depth (below ground level).
∙ Pumping distance and lift.
∙ Electrical supply.
Selecting the Correct
Pumping Station System

Page 72

—
31
Klargester Domestic 
and Domestic+
Pumping Stations
Our domestic pumping
stations are ideal for
homes or properties 
with up to 13 people.
Quick and simple to install, they require
minimal maintenance. They come
with single or twin pumps, and are
suitable for sewage, surface water and
effluent. Appropriate for 24 Hour storage
requirements.
Product Benefits
∙ Made with super-tough, low
maintenance GRP and high quality
polyethylene for guaranteed durability.
∙ Comes with options of remote
monitoring systems.
∙ Designed with easy access features for
maintenance.
∙ Choose from either 110mm or 160mm
inlet connections. 
∙ Lockable covers for optimum security. 
∙ Quick connection outlet couplings.
Technical Specifications - Domestic Technical Specifications - Domestic+
Chamber Size Capacity
(Ltrs)
Tank Ma-
terial
Control
Panel Alarm Pump Type
900 x 2580 1,600 GRP Included Optional Single/Twin
900 x 2080 1,250 GRP Included Optional Single/Twin
Chamber Size Capacity
(Ltrs) Tank Material Control
Panel Alarm Pump Type
1000 x 2000 1,450 Polyethylene Included Standard Single/Twin
1000 x 2500 2,200 Polyethylene Included Standard Single/Twin
Applications
Suitable for a wide range of applications,
the Compact and Domestic range of
Klargester Pumping Stations are suitable
for the following types of applications
and many more:
Domestic
Properties
Roof and
Surface Water
Small Commercial
Offices
Remote 
Classrooms

Page 73

—
32
Water Management Solutions
Klargester Vertical 
Pumping Stations
Product Benefits
∙ High-level alarm.
∙ Internal lifting chains and guide rails (as
specified).
∙ Wide range of pump options including
macerators/vortex.
∙ Range of emergency overflow tanks, 
if required.
∙ Inlet connection sizes to suit site.
∙ Various invert depths and positions.
∙ GRP chambers with internal pipework in
plastic, galvanised or cast iron.
∙ Optional kiosks with warning beacons
and optional telemetry systems.
∙ Service and maintenance plans available
to prolong the life of the pump systems.
Our Pumpstor
Commercial pumping
systems are ideal for
developments and
premises where drainage
by gravity isn’t an option.
Tanks and pumps come in a range of
sizes and dimensions and have a 24-hour
storage capacity for foul waste to comply
with Building Regulations. A wide range
of surface water pumps are available for
such applications from small roof run offs,
to large SUDS schemes, delivering up to
70 litres/second.
Pumpstor Commercial pumping stations
are made from robust GRP. They are
designed as a single-piece chamber, ready
for installation with no man-entry required.
Technical Specifications
Vertical Tank Size (mm) Capacity (Ltrs) Tank Material Control Panel Alarm Pump Type
1250 Diameter Up to 4,800  GRP Included Standard Single/Twin
1800 Diameter Up to 10,000 GRP Included Standard Single/Twin
2600 Diameter Up to 22,000 GRP Included Standard Single/Twin
Applications
Designed for easy installation and available
in many sizes to meet an extensive range of
customer requirements, the Klargester range
of Horizontal and Vertical Pumping Stations
are typically used in applications including:
Housing
Developments
Hotels &
Restaurants
Caravan/
Camping Sites
Nursing Homes
Surface Water
Run-off
Large Commercial
Developments
Schools

Page 74

—
33
Klargester Horizontal 
Pumping Stations
If power supplies fail,
Pumpstor Commercial
responds instantly,
separating liquids and
solids into a separate
chamber and storing
waste for up to 24 hours.
Once power is restored,
the pumps will work
normally again without
further maintenance.
Product Benefits
∙ Single-tank installation up to 79m3
(multiple tank systems available).
∙ Multiple valve chamber location and
invert options.
∙ Weir screen features innovative
removable filters, so there’s no
need to access the chamber during
maintenance.
∙ High-level alarm.
∙ Totally sealed system.
∙ One-piece tank chamber for easy
installation.
∙ Minimal on-site assembly.
∙ Less cranage and shallower excavation
than concrete pumping stations.
∙ On-site Health & Safety issues are
minimised – no requirement for
personnel to enter the tank.
Commercial Pump Systems are made
from GRP. It is designed as a single piece
chamber with two separate sections.
one for normal operation and one for
emergency storage.
Tank Size (mm) Capacity (Ltrs) Tank Material Control Panel Alarm Pump Type
2,600 Diameter 18000-79000 GRP Included Standard Single/Twin
Technical Specifications
The adoptable and high
specification pump
stations are designed to
meet the requirements of
‘Sewers for Adoption 7th
Edition’ and the ‘Water
Industry Standard’ (WIS).
For expert advice, please contact our
specialist team on 01296 633033
Manufactured as a ready to install pre-
fabricated unit for Type 1 and Type 2
installations for up to 20 dwellings.
—
Product Benefits
∙ GRP single piece wet well delivered to
site ready to install.   
∙ Pre-fitted internal pipework, pump
guide rails and overflow filters.   
∙ Approved control panel and kiosk. 
∙ All necessary drawings supplied.
Klargester Adoptable and High
Specification Pump Systems

Page 75

—
34
Water Management Solutions
Klargester Gamma
Fully Integrated Rainwater
Harvesting System
The Klargester Gamma
rainwater harvesting
system is designed as
an intelligent rainwater
harvesting system, tailor
made for your home.
With a technologically advanced finish,
Gamma is suitable for both self build
projects and residential developments.
It works by taking the rain from your roof
gutters, filtering out leaves and debris and
storing the water in an underground tank.
Manufactured from tough polyethylene,
the tank is robust and lightweight, which
makes it easy to handle and install. Its
fuss free design offers high functionality,
making it the perfect choice for your
home or garden.
Automatic in operation, the Gamma
rainwater harvesting system offers
powerful features for complete peace of
mind in your home. The intelligent system
ensures an automatic supply of harvested
rainwater for your home and garden.
For home and garden use, the Gamma is
available in capacities between 2,350-
4,600 litres.
Model
Reference
Tank Dimensions
Capacity
Standard
Overall
Height
Standard
Inlet Invert*
Standard
Outlet
Invert*
Length Width
Gravity System
GRW080 2,350 Ltrs 1,770mm 720mm 750mm 3,000mm 1,180mm
GRW110 3,100 Ltrs 2,260mm 720mm 750mm 2,480mm 1,130mm
GRW160 4,600 Ltrs 2,260mm 720mm 750mm 3,360mm 1,215mm
Direct System
GRW080 2,350 Ltrs 1,768mm 720mm 750mm 3,000mm 1,180mm
GRW110 3,100 Ltrs 2,260mm 720mm 750mm 2,480mm 1,130mm
GRW160 4,600 Ltrs 2,260mm 720mm 750mm 3,360mm 1,215mm
* Includes tank neck - adjustable to suit required invert.
The Gravity System uses
an elevated header tank
to store filtered water
after the main tank.
01     The Gravity System 
The Direct System pumps
water from the main
storage tank and is used
where a header tank is
impractical.
02     The Direct System 
34
1
5
9Typical Applications Include:
Domestic
Laundry
WC
Flushing
Garden and
Landscape Watering
Vehicle
Washing

Page 76

—
35
Features and Benefits
∙ Can reduce water consumption in
domestic applications by up to 50%. 
∙ Easy to install and simple to maintain. 
∙ ‘Fit and Forget’ system, ensuring
an automatic supply of harvested
rainwater. 
∙ Shallow Dig—the Gamma is designed
with easy, affordable installation 
in mind.
∙ Pea shingle backfill available—no costly
excavation and soil disposal necessary
(dependent upon site conditions). 
∙ Fully compliant—Gamma is tested
in accordance with BS 8515:2009.
standards.
Home and 
Garden
Advisory
Consultants
Reduces Water
Consumption
Offers Fast
Payback
Regulations
Compliant
10
8
11
6
72
1 Water main
2 Storage tank
3 Header tank (optional extra)
4 Pressure Vessel (not supplied)
5 In-line filter 120 microns
6 Internal rainwater filter
7 Grundfos Intelligent Pump— 
SBA 3-23M
8 Adjustable tank neck
9 External tap (not supplied)
10 Roof rainwater feed
11 Filtered rainwater feed
A
Optional Extra - Header Tank
When ordering your system, to make the
Gravity System complete you will require
a header tank. Klargester offers a header
tank with weir, ballcock and float valve
which allows the switch over to mains, the
weir provides the mandatory air gap.
A Mains Input
B  Rainwater Input
C  Water Regulations Compliant   
Mandatory Air Gap
D  Overflow Point
E  Rainwater Level Control
F  Mains Level Control
B
C
D
F
E

Page 77

—
36
Water Management Solutions
Klargester Aquabank®
Rainwater Harvesting
Range
On water consumption in
domestic applications with
Klargester Rainwater Harvesting
solutions
Assists Planning Application —
Authorities increasingly expect
applications to demonstrate
Sustainable Drainage (SUDS)
The system that pays for
itself — money saved through
reduced water bills means
aquabank can pay back its
purchase costs
50
%
Overview
The Klargester Aquabank rainwater
harvesting system is designed with
simplicity in mind. 
01 02 03
Aquabank is suitable for single residential
applications. It uses cohesive design with
the system controlled by a pump, with
options for either direct or gravity fed
applications. It’s a highly intuitive system
– easy to use with no need for a control
panel, display panel or depth sensor.
Manufactured from strong GRP material,
Aquabank is a complete ‘kit in a box’ –
easy to install and the smart choice for
your home’s rainwater harvesting needs. 
For home and garden use, the Aquabank
is available in capacities between 1,000
and 6,000 litres.
—
Features and Benefits
∙ Easy to install.
∙ Simplified system designed for 
rapid installation. 
∙ Quick start set up procedure.
∙ ‘Kit in a box’ set of key components.
∙ Easy conversion to gravity system with
header tank. 
∙ Minimal energy use in operation.
∙ Fully compliant - designed in accordance
with BS EN8515.
Rainwater is stored in underground tank Rainwater is pumped at a constant
pressure to an elevated header tank
Water is pumped to a garden sprinkler or
hose as required
Applications:
Vehicle Washing Garden Watering
Benefits of Installing Klargester
Domestic Rainwater Systems
SAVE UP TO
How it works
Model Capacity (Ltrs) Standard Overall Height Standard Inlet Invert Standard Outlet Invert Diameter / Width Length
Gravity & Direct System
AQB010 1,000 2,140mm 500-800mm 530-830mm 1,225mm 1,125mm
AQB028 2,800 2,582mm 500-1000mm 530-1030mm 2,070mm —
AQB038 3,800 2,811mm 500-1000mm 530-1030mm 2,070mm —
AQB046 4,600 2,961mm 500-1000mm 530-1030mm 2,070mm —
AQB060 6,000 2,365mm 500-800mm 530-830mm 1,424mm 4,275mm
WC Flushing Domestic Laundry

Page 78

—
37
Fully 
Compliant
Easy to 
InstallKlargester RainTrap®
Rainwater Storage and
Delivery System
Overview
An economical rainwater harvesting
system designed to make garden
watering simple. The Klargester
RainTrap system comprises of a filter, an
underground storage tank and a pump.
Rainwater runs down the roof and into
the guttering and downpipes in the
normal way before passing through the
filter, which removes any leaves or debris.
Rainwater is stored in the underground
tank from which it is pumped at a constant
pressure to an outside tap as required.
The RainTrap has many advantages over
traditional garden waterbutts. In addition
to being able to store far larger quantities
of water, it removes the need to carry
water around and does not flood when
full, since the excess water exits via a
soakaway or surface water drain.
—
Features and Benefits
∙ Easy to install.
∙ Inexpensive.
∙ Simple on / off operation.
∙ Suitable for existing and new homes.
∙ Available in sizes from 1,000 — 6,000 litres.
∙ Automatic rainwater diversion when
tank reaches full capacity. 
∙ Internal leaf filter.
∙ Designed and manufactured in the UK.
4
5
6
1
2
3
7
Technical Specifications – RainTrap
Model Reference Capacity (Ltrs) Diameter (mm) Height Base to Outlet (mm)
RT2800 2,800  2,070 1,540
RT3800 3,800 2,070 1,760
RT4600 4,600 2,080 1,925
1. Pump power switch
2.  Pumped water to required
application, e.g. garden hose,
power washer
3. Rainwater inlet (110mm)
4. Submersible pump
5.  Wastewater / overflow outlet
(110mm)
6. Leaf filter
7. Safety manhole lid

Page 79

—
38
Water Management Solutions
Klargester Commercial 
Below Ground Rainwater
Harvesting System
The commercial range provides a secure
solution for any size of building project
from 6,000 litres up to 79,000 litres
of water in a single tank. For larger
capacities, multiple tanks may be
connected together to meet storage
requirements.
It is available as either a gravity or
direct system, depending on specific site
requirements.
Large installations are carefully sized and
selected, taking into consideration the
following factors:
∙ Roof water yield.
∙ Projected water consumption.
∙ Groundwork criteria (prevailing water
table, soil conditions, requirements or
traffic access).
∙ Suitable filters and pumps to match
system specifications, ensuring the
water is kept at an optimum level of
clarity and supply pressure).
Features
∙ Capacities from 6,000 to 79,000 litres
within a single tank.
∙ Multiple tanks can be joined to cater for
larger volumes.
∙ Can be installed under trafficked areas
(with reinforced concrete support).
∙ Complete packaged units delivered
directly to site.
Single Pump Model Reference Twin Pump Model Reference Capacity (Ltrs) Diameter(m)
ENV0200SKSW ENV0200TKSW 6000 1.4
ENV0275SKSW ENV0275TKSW  8000 1.8
ENV0350SKSW ENV0350TKSW 10000 1.8
ENV0485SKSW ENV0485TKSW 14000 1.8
ENV0625SKSW ENV0625TKSW 18000 2.6
ENV0765SKSW ENV0765TKSW 22000 2.6
ENV0900SKSW ENV0900TKSW 26000 2.6
ENV1040SKSW ENV1040TKSW 30000 2.6
ENV1320SKSW ENV1320TKSW 38000 2.6
ENV1460SKSW ENV1460TKSW 42000 2.6
ENV1735SKSW ENV1735TKSW 50000 2.6
ENV2050SKSW ENV2050TKSW 59000 2.6
ENV2325SKSW ENV2325TKSW 67000 2.6
ENV2745SKSW ENV2745TKSW 79000 2.6
The Klargester
commercial range is a
fully integrated, intelligent
rainwater harvesting
solution suitable for
such applications as
commercial vehicle
washdown areas, garden
centres and
golf courses.
Technical Specifications

Page 80

—
39
After Sales
Service and
Support
To speak with us about any aspect of
installation, commissioning or service 
simply contact:
GB:
Tel: 0333 240 6868
Email: helpingyou@kingspan.com
kingspan.co.uk/klargester
Together we are working to provide first
class service across a range of sectors,
including domestic, commercial, industrial,
leisure, hospitality and many more.
With expertise across the Klargester range
of waste water and drainage solutions,
pumping stations, separators and rainwater
harvesting, our dedicated support network
offers the following offers the after sales
service and support you would expect from
a global organisation.
∙ First class technical engineering
expertise across a range of off-mains
sewage and wastewater applications.
∙ Day to day technical support.
∙ 24 hour breakdown repair.
∙ Preventative maintenance plans.
∙ Installation and commissioning.
∙ Asset monitoring.
∙ Consultancy and advice.
We recognise the
importance of after
sales service and support
and are proud of our
nationwide Kingspan
Service network, which
comprises our Kingspan
in-house Service team
and Accredited Installer
network in support of the
Klargester Product Range.

Page 81

UK
Kingspan Environmental Ltd
College Road North,
Aston Clinton, Aylesbury,
Buckinghamshire, HP22 5EW
T: +44 (0) 1296 633000
F: +44 (0) 1296 633001
E: water@kingspan.com
W: kingspan.co.uk/water
Ireland
Kingspan Environmental Ltd
Unit 1a, Derryboy Road
Carnbane Business Park
Newry, BT35 6QH
T: +44 (0) 28 3026 6799
E: water-ie@kingspan.com
W: kingspan.ie/water
Norway
Kingspan Miljø AS
Skiveien 42, 1410 Kolbotn,
Norway
T: +47 22 02 19 20
E: avlopslosninger@kingspan.com
W: kingspan.com/avlopslosninger
Germany
Kingspan Environmental GmbH
Fuggerstraße 15
49479 Ibbenbüren, Deutschland
T: +49 (0) 6102 3686700
E: wasser@kingspan.com
W: kingspan.de/wasser
Australia
Kingspan Environmental Pty Ltd
8 Bessemer St, Blacktown
Sydney, NSW 2148
T: +61 (0) 2 8889 5400
Toll Free: (within Australia)
1300 736 562
E: sales.au@kingspan.com
W: kingspan.com.au/water
Poland
Kingspan Environmental Sp. z o.o.
ul. Topolowa 5
62-090 Rokietnica
Polska
T: +48 61 660 94 71
E: woda@kingspan.com
W: kingspan.pl/woda
We take every care and precaution to ensure that information in this document is accurate at the point of publish
but with continuous product development the details given in this document are subject to alteration without notice.
Kingspan | Klargester Product Guide – English – May 2018
Water Management Solutions

Page 82

**Dates denotes attached emailed correspondence appended to appeal paperwork** 
 
 
March 2022                       
1/3/22 
Application lodged. 
 
 
May 2022                       
6/5/22 
Application Validated. 
 
 
July 2022                       
20/7/22 
Delay ‐ New Local plan adoption backlog 
 
 
August 2022                       
11/8/22 
Delay ‐ Redoing policies within the report 
 
 
September 2022                     
20/09/22 
Delay ‐ Request for PA to sept 30 
 
 
30/09/22 
Delay ‐ Issue with new policy wording 
 
 
November 2022                     
2/11/22 
Delay ‐ Request for PA to Nov 4 
 
3/11/22 
Confirmation of refusal to advice to appeal

Page 83

Our Ref:
Contact:
Tel:
E-mail:
Date:
22/00232/PPP
Stewart MacCallum
01236 632500
Planningenquiry@northlan.gov.uk
6 May 2022
Mrs Shiela Oakes
c/o David Aitcheson
OSD Design Solutions Ltd
International House
Suite 1/J3
Stanley Boulevard, Blantyre,
GLASGOW
United Kingdom
G72 0BN
Dear Sir/Madam,
Proposal: Dwellinghouse with garage and access (in principle)
Address: Site At, Mill Road, Allanton, North Lanarkshire,
I refer to your application received on 1 March 2022.
Sometimes we need to change the description of work because parts of the proposals do not need
permission. If you don’t agree with any changes we have made, please email us as soon as possible.
If you are submitting any further information relating to this application, such as revised plans,
photographs, supporting reports and information relating to planning conditions, please do so via the
eplanning portal at http://ePlanning.scot using the post submission form.
You can contact the case officer Stewart MacCallum by email at MacCallumS@northlan.gov.uk
What happens next?
Your application should be determined by 5 July 2022, unless we have agreed an extended
decision date with you in writing.
For planning applications, your neighbours will be notified.
We will contact you if we need any further information or if we can suggest any improvements to
your proposals.
For planning applications, a site inspection will normally be carried out within 10 days of your
application being made valid. You will not normally be contacted, as you don’t need to be there.
However, if you are there our officer will introduce themselves and will show you formal
identification.
If we don’t meet the time scales to process your application, you can appeal. Any appeal must
be submitted within three months of the agreed date on which the decision was due and must
be submitted on a form which is available from www.northlanarkshire.gov.uk/planning-and-
building/planning-applications/appeal-against-our-decision.
How to appeal is set out in the attached guidance notes.
We may copy the plans you have submitted for the benefit of consultees or other affected parties.
Enterprise And Communities
Lorna Bowden
Planning And Place Manager
1st Floor Civic Centre
Windmillhill Street
Motherwell ML1 1AB

Page 84

A receipt for any fee submitted with your application is attached to this letter.
Yours faithfully,
Lorna Bowden
Planning And Place Manager
Explanatory Notes
These notes have been prepared to help you understand the process the application will follow,
depending on the decision level.  Under the Planning etc (Scotland) Act 2006 there are four common
levels of classification and determination for applications.  These are Local Development application
determined under delegated powers, Local Development application determined by committee and
Major Development applications determined by Committee and Major Development applications
determined by the full Council.  The accompanying letter clarifies what classification and anticipated
determination level has been given to your application.  
Decisions made under Delegated Powers
A decision for a ‘Local’ application may be taken by officials under delegated powers.  This will depend
upon the nature and size of the proposal.  The council’s Scheme of Delegation can be found on our
website: www.northlanarkshire.gov.uk
Where applications are determined under the scheme of delegation, any appeal will be considered by
the council’s Local Review Body.  An appeal must be made on a ‘Notice of Review’ form which is
available from our website. This must be submitted to the council’s Corporate Services Department,
Civic Centre, Motherwell within three months of the decision date of the application. 
If a delegated application has not been determined within two months and there has been no formal
agreement to an extended processing period then an appeal can be made to the Local Review Body.
Such appeals must be submitted, to NLC’s Corporate Services (as above) within three months of the
date on which it has been agreed a decision was due from the council.
Local Review Body
The Local Review Body is made up of local Councillors.  It is anticipated that applications going before
the Local Review Body can will mainly be dealt with through consideration of the issues raised in the
submitted Notice of Review, the Decision Notice, the Report of Handling (of the application) and
background documents submitted with the application.  It is, however, at the discretion of the Local
Review Body to seek further information through written submissions, and/or a hearing.
Decisions by Committee
In regards to Major and Local (Committee) applications, determination of the decision will be taken by
the Planning Committee.  An appeal against a refusal, planning conditions or the failure to reach a
decision within the statutory or otherwise formally agreed timescale can be made to the Scottish
Government via The Directorate for Planning and Environmental Appeals, 4 The Courtyard, Callendar
Business Park, Falkirk FK1 1XR (Tel: 01324 696400)
Requests for Hearings
Please note that applicants or those making representations with regards to an application can request
that they be heard in person by the Committee. Should you wish to make such a request please do so
in writing to the address on the covering letter specifying the reasons for your request.
Only applications being decided by Committee can be subject to a hearing and requests which are not
on legitimate planning grounds will not be taken into account.

Page 85

NORTH LANARKSHIRE COUNCIL
Enterprise and Communities
Lorna Bowden, Planning and Place Manager
Southern Area Office, Dalziel Building, 7 Scott Street, Motherwell ML1 1SX
VAT REG. NO. 659 282 009
This is an official receipt for Planning Application Reference: 22/00232/PPP
Please retain for your records.
Date: 28th February 2022 Received from:
The sum of: £401 Payment Method: Credit/Debit Card Fee
being: Planning Application Fee Receipt Reference:
Receiving Officer: 
Date: 5th May 2022 Received from:
The sum of: £135.06 Payment Method: Bank Transfer
being: Advert Application Fee Receipt Reference:
Receiving Officer:
Site Address: 
Site At  Mill Road  Allanton  North Lanarkshire