Enterprise and Communities - Revenue Monitoring Report
North Lanarkshire Council · 16 November 2022
Back to Housing Committee — 16 November 2022 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.
Page 1
North Lanarkshire Council Report Housing Committee Does this report require to be approved? ☐ Yes ☒ No Ref GT/JMcG Date 16/11/22 Revenue Monitoring Report – Enterprise and Communities From Derek Brown, Depute Chief Executive E-mail telferg@northlan.gov.uk Telephone Greg Telfer, Business Finance Manager, 07583 010692 1. Background 1.1 The Council’s approved Financial Regulations require services to remain within their approved budgetary provision, and to report all significant deviations – defined as the higher of £100,000 or 5% - within their budget monitoring reports. Where significant deviations are identified, services must provide explanatory commentary, outline the action required to rectify such deviations and where relevant, must also highlight the impact this has on other budget headings. Executive Summary This report provides a summary of the financial performance of the Enterprise and Communities Service for the period 1 April 2021 to 16 September 2022 (Period 6). The report illustrates the projected outturn as at 31 March 2023, with major outturn variances highlighted and explained as per the Council’s approved Financial Regulations. In summary, the Enterprise and Communities Service is currently forecasting an overspend of £3.958m which is in relation to inflationary pressures (£3.068m), which will be offset by a corporate contingency and also the reallocation of the digital savings to Services (£0.890m) for which the Service continues to work with Business and Digital to progress plans for delivery of savings. Recommendations It is recommended that Committee: (1) Acknowledges the financial position of the 2023/23 Enterprise and Communities revenue budget. The Plan for North Lanarkshire Priority Improve economic opportunities and outcomes Ambition statement (25) Ensure intelligent use of data and information to support fully evidence based decision making and future planning
Page 2
1.2 The most significant financial risk facing Enterprise and Communities during 2022/23 is inflationary pressures across a number of service areas including fuel and utilities, food costs, waste tonnage and contractual inflation on property and road maintenance contracts. At Period 6 it is forecast that the impact of this is £3.068m and this will continue to be monitored and reported through service budget monitoring reports alongside the ongoing impact of the curtailment of non-essential expenditure with the overall impact managed corporately. 2. Report Summary of Financial Position 2.1 The Council approved its General Fund Revenue Budget on 17th February 2022, of which £146.298m (17%) represented the approved Net Revenue Budget for Enterprise and Communities. Since then there has been additional budget added for Scottish Government funding for climate change (£0.075m), a budget transfers to other services mainly (£0.168m) and the transfer of digital savings targets (£1.535m) resulting in a revised Enterprise and Communities Net Budget of £144.670m. 2.1.1 Enterprise and Communities is forecasting an overspend of £3.958m in relation to inflationary pressures and a delay in the delivery of savings linked to the DigitalNL programme. Like most organisations, the Council is facing significant pressures linked to the wider economic outlook and high inflation. Across the service this is having an impact on the cost of energy, waste disposal, fuel, food and materials. The Council has set aside approximately £9.4m corporately to support unbudgeted inflationary pressures faced by services. 2.1.2 In addition, the Service faces a cost pressure attributable to the delay in implementation of savings linked to the DigitalNL programme (£0.890m). The service continues to work with Business and Digital to progress plans for the delivery of these savings. 2.1.3 Section 2.2 provides commentary on the financial performance of the Service per division excluding the impacts of inflation and digital savings. In addition, Appendices 1 to 7 of this report provide further explanation of the significant budget variations contributing to this outturn position. 2.1.4 The 2022/23 Enterprise and Communities budget incorporates £1.545m of savings previously approved by Council on 2 March 2021 with £0.797m of savings (52%) deliverable within the current financial year. Further information regarding particularly challenging savings is noted in paragraph 2.4 below. Analysis of Significant Variations 2.2 Excluding the impact of inflation and digital savings Enterprise and Communities service currently forecasts a year-end balanced budget position. As at Period 6, there are compensating variances across the divisions as follows: 2.2.1 Environmental Assets (£0.215m Underspend) The Environmental Assets division projects vacancy savings of £1.061m. This is partially offset by costs in relation to electric vehicle charging for which there has been significantly increased demand and unit costs (£0.466m). In addition, the division has also experienced increased costs for waste disposal (£0.180m).
Page 3
2.2.2 Asset and Procurement Solutions (£0.088m overspend) The division projects an overspend of £0.258m within property costs due to a delay in the timing of office accommodation savings (£0.473m) partially offset by a reduction in repairs and temporary rates reliefs for empty properties. Within the provision of school meals the service expects an under recovery in paid meal income (£0.365m) which is fully offset by vacancies across the division. 2.2.3 Regulatory Service and Waste Solutions (£0.789m overspend) The overspend is mainly as a result of increased agency and overtime costs in Waste as a result of delays in recruitment (£0.431m), increased requirement for vehicle parts (£0.204m) and under-recoveries in Special Uplifts as a result of reduced demand (£0.161m). 2.2.4 Planning and Regeneration (£0.335m underspend) Within Planning and Regeneration vacancy savings and additional grant income contribute to a projected underspend of £0.335m. 2.2.5 Included within the reported outturn is the Council’s trading services. For 2022/23 the Council approved a surplus budget of £0.596m. The Council must comply with a statutory requirement to at least break-even over a rolling three year period. The combined surplus in 2019/20, 2020/21 and 2021/22 was £0.380m. As at Period 6 there are no significant variations to report with regards to trading services. 2.2.6 Payments to other bodies are detailed in Appendix 3. This expenditure category accounts for £21.189m with a minor overspend of £0.063m forecasted for 2022/23 within payments to roads contractors. Earmarked and One-off Reserves 2.3 Enterprise and Communities was given approval to earmark £17.536m of resources during the completion of the 2021/22 annual accounts. It is forecast that £14.630m of the reserve balance will be utilised in 2022/23. The remaining balance of £2.906m is required for the original purpose in future years. Appendix 4 details the individual Earmarked Reserves. 2022/23 Budget Savings and Growth 2.4.1 The Service uses a variety of information, records and processes to monitor achievement of its approved budget savings of £1.545m. As at Period 5, £0.797m (52%) of its approved savings are achievable during the year. The gap of £0.748m represents timing delay in office rationalisation savings (£0.473m), the previously approved reduction in school cleaning (£0.200m, offset with an Earmarked Reserve in 22/23) and delays in staffing savings (£0.078m). This currently excludes the impact of savings linked to the DigitalNL programme. 2.4.2 As part of the Council’s investment budgets for 2021/22 and 2022/23, Enterprise and Communities was allocated £9.228m towards a number of one-off investments. Appendix 6 highlights in detail how these are being utilised across the Service. Management Actions 2.5 The Service continues to take a range of corrective management actions to ensure it manages cost pressures. This includes curtailment of non-essential spend and monitoring of vacancies.
Page 4
Change Management 2.6 The Service expects to use £0.125m of the Council’s Change Management Fund mainly to support the supply of new bins and materials within Environmental Assets. Costs within the Change Management Fund are not included in the Service outturn position. 3. Measures of success 3.1 The Service continues to operate within the approved budget resources. 4. Supporting documentation Appendix 1 Objective Analysis Appendix 2 Subjective Analysis Appendix 3 Payments to Other Bodies Analysis Appendix 4 Status of Earmarked Reserves Appendix 5 Challenging Savings Appendix 6 One-Off Investments Derek Brown Depute Chief Executive
Page 5
5. Impacts ( http://connect/report-template-guidance ) 5.1 Public Sector Equality Duty and Fairer Scotland Duty Does the report contain information that has an impact as a result of the Public Sector Equality Duty and/or Fairer Scotland Duty? Yes ☐ No ☒ If Yes, please provide a brief summary of the impact? If Yes, has an assessment been carried out and published on the council’s website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer- scotland-duty-impact-assessments Yes ☐ No ☐ 5.2 Financial impact Does the report contain any financial impacts? Yes ☒ No ☐ If Yes, have all relevant financial impacts have been discussed and agreed with Financial Solutions? Yes ☒ No ☐ If Yes, please provide a brief summary of the impact? The Service continues to curtail non-essential expenditure and take management action to minimise the impact of cost pressures on the Council’s overall financial position. 5.3 HR policy impact Does the report contain any HR policy or procedure impacts? Yes ☐ No ☒ If Yes, have all relevant HR impacts have been discussed and agreed with People and Organisational Development? Yes ☐ No ☐ If Yes, please provide a brief summary of the impact? 5.4 Legal impact Does the report contain any legal impacts (such as general legal matters, statutory considerations (including employment law considerations), or new legislation)? Yes ☐ No ☒ If Yes, have all relevant legal impacts have been discussed and agreed with Legal and Democratic Solutions? Yes ☐ No ☐ If Yes, please provide a brief summary of the impact? 5.5 Data protection impact Does the report / project / practice contain or involve the processing of personal data? Yes ☐ No ☒ If Yes, is the processing of this personal data likely to result in a high risk to the data subject? Yes ☐ No ☐ If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e- mailed to dataprotection@northlan.gov.uk Yes ☐ No ☐
Page 6
5.6 Technology / Digital impact Does the report contain information that has an impact on either technology, digital transformation, service redesign / business change processes, data management, or connectivity / broadband / Wi-Fi? Yes ☐ No ☒ If Yes, please provide a brief summary of the impact? Where the impact identifies a requirement for technology, has an assessment been carried out (or scheduled) by the Enterprise Architecture Governance Group (EAGG)? Yes ☐ No ☐ 5.7 Environmental / Carbon impact Does the report / project / practice contain information that has an impact on any environmental or carbon matters? Yes ☐ No ☒ If Yes, please provide a brief summary of the impact? 5.8 Communications impact Does the report contain any information that has an impact on the council’s communications activities? Yes ☐ No ☒ If Yes, please provide a brief summary of the impact? 5.9 Risk impact Is there a risk impact? Yes ☒ No ☐ If Yes, please provide a brief summary of the key risks and potential impacts, highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk Registers), and how they are managed? All activities undertaken by the Council are subject to risk, and in acknowledging the Council’s approved Risk Management Strategy, Services managed these as part of their overall corporate and service planning processes. The current economic climate, in particular, has the potential to impact upon the Council’s ability to provide quality services within the approved budget levels. To reduce other financial risks, this report was prepared by service based Financial Solutions personnel in consultation with budget managers, in accordance with the Financial Regulations.
Page 7
Appendix 1 DIVISION OF SERVICE BUDGET ACTUAL ANNUAL PROJECTED MOVEMENT FROM ANALYSIS TO DATE TO DATE BUDGET OUTTURN % PERIOD 4 (1) (2) (3) (5) (6) (8) (9) (10) £ £ £ £ % ENVIRONMENTAL ASSETS 12,939,267 14,710,833 47,427,455 48,161,565 (1.6%) (734,110) Overspend as a result of Utility Inflation / Digital savings £0.948m and increased usage and price for Electric Vehicle Charging partly offset by vacancy savings. REGULATORY SERVICES AND WASTE SOLUTIONS 15,192,896 15,735,580 37,174,707 39,572,638 (6.5%) (2,397,931) Overspend as a result of Inflation mainly for Waste Disposal costs and Fuel and digital savings £1.609m. Additional spend in agency costs/overtime due to recruitment delays parly offset by vacancies, also reduced demand for Special Uplift resulting in an under recovery in income. ASSETS & PROCUREMENT 18,091,563 17,453,739 38,272,520 39,375,946 (2.9%) (1,103,426) Overspend as a resilt of Utility and Food Inflation and Digital Savings £1.015m and timing delays in Office Rationalisation savings. There is also an under recovery in paid meal income which is offset by vacancy savings. PLANNING & REGENERATION 2,057,893 1,949,455 9,764,283 9,428,845 3.4% 335,438 Underspend as a result of Vacancy savings and increased grant income HOUSING SOLUTIONS 1,446,692 1,315,815 5,130,715 5,126,528 0.1% 4,187 Minor underspend as vacancy savings and other minor miscellaneous budget savings offset the Utility inflation and Digital Savings £0.214m HOUSING PROPERTY & PROJECTS 3,608,348 3,869,254 7,495,518 7,558,142 (0.8%) (62,624) Overspend as a result of Inflation for Stair & Close lighting TRADING (313,672) (436,375) (595,542) (595,542) 0.0% (0) Balanced budget NET EXPENDITURE 53,022,987 54,598,301 144,669,656 148,628,122 (3,958,466) (0) (1,575,314) (3,958,466) 335,438 4,187 (62,624)(260,906) 122,703 £ (734,110) (1,103,426) (2,397,931) 637,824 108,438 130,877 £ (1,771,567) (542,684) (4) (7) Enterprise & Communities Revenue Budget Monitoring Reort - Objective Analysis 1st April 2022 - 16th September 2022 (PERIOD 06) YEAR TO DATE PROVISIONAL VARIANCE VARIANCE
Page 8
Appendix 2 CATEGORY BUDGET ACTUAL ANNUAL PROJECTED MOVEMENT FROM ANALYSIS TO DATE TO DATE BUDGET OUTTURN % PERIOD 4 (1) (2) (3) (5) (6) (8) (9) (10) £ £ £ £ % EMPLOYEE COSTS 42,459,479 40,362,853 96,823,593 95,639,150 1.2% 1,171,967 Vacancy savings partly offset by overtime and turnover PROPERTY COSTS 10,972,267 11,974,262 39,026,581 41,029,047 (5.1%) (1,849,310) Timing delay in Office rationalisation saving and increased waste disposal costs, inflation increases for utilities SUPPLIES & SERVICES 5,246,531 6,068,941 17,817,122 19,765,686 (10.9%) (2,086,031) Utility increases for Street Lighting and increase demand and cost for electric car charging, increase IT software costs and agency staff due to delayed recruitment in Waste. TRANSPORT & PLANT 2,412,714 2,783,310 5,277,528 6,448,949 (22.2%) (1,169,893) Increased fuel costs as a result of price increases ADMINISTRATION COSTS 860,697 827,123 7,983,537 8,136,277 (1.9%) (171,693) Increase in consultants fees PAYMENTS TO OTHER BODIES 6,345,471 5,516,637 21,188,737 21,251,312 (0.3%) (32,304) Minor variance TRANSFER PAYMENTS 1,707 1,707 584,000 584,000 0.0% 0 Balanced Budget CAPITAL FINANCING COSTS 4,393,185 5,902,369 32,591,588 32,591,588 0.0% 0 Balanced Budget REVENUE FINANCING COSTS 0 0 0 0 0.0% 0 Balanced Budget OTHER EXPENDITURE 726,426 919,500 3,778,062 3,668,692 2.9% 110,554 Underspends in miscellaneous costs and external company payments. TOTAL EXPENDITURE 73,418,478 74,356,702 225,070,749 229,114,701 (1.8%) (4,026,710) INCOME 20,395,491 19,758,402 80,401,092 80,486,579 0.1% 68,245 Minor Variance NET EXPENDITURE 53,022,987 54,598,301 144,669,656 148,628,122 (2.7%) (3,958,465)(1,575,314) (2,002,466) (1,948,564) (1,171,421) (152,740) (62,575) 0 0 0 109,370 (4,043,952) 85,486 (3,958,466) (1,509,184) 0 (193,075) (938,225) 637,089 (822,410) (370,596) 33,574 828,834 0 £ 2,096,626 £ 1,184,443 (1,001,995) (4) (7) Enterprise & Communities Revenue Budget Monitoring Report - Subjective Analysis 1st April 2022 - 16th September 2022 (PERIOD 06) YEAR TO DATE PROJECTED OUTTURN VARIANCE VARIANCE
Page 9
Appendix 3 DESCRIPTION BUDGET ACTUAL ANNUAL PROJECTED MOVEMENT FROM TO DATE TO DATE BUDGET OUTTURN % PERIOD 4 TYPICAL AREA OF EXPENDITURE/ANALYSIS OF VARIATIONS (1) (2) (3) (5) (6) (8) (9) (10) £ £ £ £ % PUBLIC ANALYST FEES 133,500 133,500 267,000 267,000 0.00% 0 Balanced budget AMEY ALLOCATION 2,790,741 2,784,030 11,064,072 11,064,072 0.00% 0 Balanced budget PAYMENTS TO CONTRACTORS - ROADS MAINT 204,611 248,622 638,433 648,576 -1.59% (8,541) Minor variance SUB-CONTRACTOR PAYMENTS 295,354 306,847 501,355 522,617 -4.24% (21,262) Minor variance PSG COUNCIL PROGRAMME 14,476 14,476 242,853 242,853 0.00% 0 Balanced budget PAYMENTS TO OTHER BODIES - GENERAL 2,296,440 1,495,965 6,846,804 6,843,662 0.05% 1,540 Minor variance AGENCY FEES 2,315 2,348 208,904 241,342 -15.53% (2,168) Minor Variance SUPPORT FEES 572,228 511,207 1,289,930 1,289,930 0.00% 0 Balanced budget OTHER PTOB 35,807 19,642 129,386 131,259 -1.45% (1,873) Minor variance TOTAL EXPENDITURE 6,345,471 5,516,637 21,188,737 21,251,312 (0.3%) (32,304) £ £ 0 (10,143) 6,711 (44,011) 828,834 (62,575) 61,021 0 16,166 (1,873) (34) (32,438) 0 (21,262) 0 (11,493) (4) VARIANCE (7) Enterprise & Communities Revenue Budget Monitoring Report - Payments to Other Bodies Analysis 1st April 2022 - 16th September 2022 (PERIOD 06) YEAR TO DATE VARIANCE PROJECTED OUTTURN 800,475 3,142 0 0
Page 10
Appendix 4 Decription of Earmarked Resource Value % Dilapidations APS - Asset Mgt 524 524 0 524 111 524 0 0 0 Costs associated with leased in property disinvestment Energy Mgt System and Office Rationalisation APS - Asset Mgt 551 551 0 551 254 551 0 0 0 Costs associated with Office closures and new energy mgt system Additional School Cleaning and Building Cleaning APS - Building Cleaning 431 431 0 431 213 431 0 0 0 Additional Cleaning requirements in schools until June 2022 and removal of previous cleaning saing Free school meal funds c/f for laptops preordered and not delivered APS - Catering 109 109 0 109 109 109 0 0 0 Laptops Pitches APS - Com Fac 70 70 0 70 0 70 0 0 0 Pitch Maintenance Costs Enterprise Contract APS - Ent Contract 1,686 1,000 0 1,000 248 1,000 0 0 366 Ongoing set up cost for the Enterprise Contract Road improvements EA - Roads 133 133 0 133 86 133 0 0 0 Targeted Roads Immprovement Exp Winter Reserve EA - Roads 1,500 1,500 0 1,500 0 1,500 0 0 0 Contingency for significant winter event Country Parks (Lighitng, rangers, events) EA - Visitors 429 316 0 316 0 316 0 0 0 Countrypark Exp - Park Rangers, Lighting, loss of event income Cemeteries EA - Visitors 140 140 0 140 90 140 0 0 0 Reduction in Cemetery Income target / increased cleaning costs. Service Developments - Bothy H&S / Ashdie Back exploratory works EA - Visitors 350 350 0 350 0 350 0 0 0 Health & Safety Repairs / Survey of requirements for Ashdie back exp HEEPS HPP 591 300 0 300 0 300 0 0 0 Energy Efficiency Schemes - contributions to current programme Additional Education Recovery - Ventillation HPP 415 415 0 415 476 415 0 0 0 School ventilation programme Rapid rehousing HS 1,159 500 0 500 42 500 0 0 0 Rapid Rehousing programme to tackle homelessness Tenant Hardship Rent Grant fund (LACER) HS 363 363 0 363 364 363 0 0 0 Sco Govt. Grant to assist rent arrears Anti Social Behaviour Task Force HS 121 121 0 121 77 121 0 0 0 Staff costs City Deal - Delburn Street / Manse Road P&R - city deal 105 105 0 105 0 105 0 0 0 Temporary Property costs as a result of capital programme Business recovery/growth P&R - Enterprise 4,993 4,094 0 4,094 0 3,994 0 0 100 Costs to support business recovery Local Development Plan P&R - P&P 290 150 0 150 0 150 0 0 0 Set up costs to produce LDP LUF Ravenscraig P&R Growth 400 400 0 400 0 400 0 0 0 Costs assoicated with LUF bid Housing Grants to owner occupiers RSWS - BE 93 93 0 93 0 93 0 0 0 Funding for Private Sector Grants Fleet - Grant for Lease Vehciles RSWS - Fleet 371 253 0 253 0 253 0 0 0 Grant funding for electric vehicles Bellshill Depot Eco hub - Due Diligence RSWS - Fleet 200 200 0 200 0 200 0 0 0 Set up costs for Eco Hub Protective Services - EHO/Pest Control/Food Safety/Env Health RSWS - PS 1,213 1,213 0 1,213 0 1,213 0 0 0 Employee costs / reduction in Pest Control income target / Environmental Health exp Waste Tonnage RSWS - Waste 622 622 0 622 0 622 0 0 0 Increased tonnage costs Digital Savings E&C 677 677 0 677 0 677 0 0 0 Digital Savings Total 17,536 14,630 0 14,630 2,071 14,530 0 0 466 Section Commentary regards usageTotal Earmarked Reserve £000 Initial 22/23 Allocation Adjustments in year 22/23 Approved Reserve Total Spend To Date Projected Outturn, 2022/23 Reserves Required For 2023/24 Onwards Reserves No Longer Required Enterprise & Communities Status of Earmarked Resources 1st April 2022 - 16th September 2022 Period 06 2022/23
Page 11
Appendix 5 Reference / Descriptions Reason for Savings Gap £000 £000 £000 £000 £000 Savings 2021/2022 and 2022/23 EC10 Asset Management Rationalisation/Office Dis- investment. 0.800 0.327 0.473 Timing of Office closures Temporary rates savings and other property repairs / Vacncies 0.473 0 EC13 Efficiencies in school cleaning service 0.200 0 0.200 Enhanced cleaning required Ear marked reserve in 22/23 0.200 0 EC37 Review of staffing within Business Intelligence and Strategic Resourcing team 0.076 0 0.076 Delays in staffing changes Mgt action across the division 0.076 Totals 1.076 0.327 0.749 0.749 Description Value Revised Savings Gap Any additional information Enterprise and Communities Revenue Budget Monitoring Report - Challenging Savings 1st April 2022 - 16th September 2022 (PERIOD 06) APPROVED SAVINGS Target Value Value Deliverabl Saving Gap REPLACEMENT SAVING / FUNDING
Page 12
No embedded text on this page.