HOUSING  -  31 AUGUST 2022 
101
31 August 2022 at 10 am. 
A Meeting of the HOUSING  COMMITTEE 
PRESENT 
Councillor Brannan-McVey, Convener; Councillor McPake, Vice-Convener; Councillors Brennan, Carragher,
M. Coyle, S. Coyle, Crichton, Di Mascio, Dunbar, Fotheringham, Goldie, Hughes, Jones, Keltie, Leckie, Logue,
MacGregor, McBride, McCluskey, B. McCulloch, M. McCulloch, McDade, McKay, McKendrick, McNally,
McPhilemy, Nolan, Reddin, Robinson, Smith, A. Stubbs, Sullivan, Toner, and Woods. 
ALSO PRESENT 
In accordance with Standing Order 64(A) Councillors Barclay, Patton, Roarty and Watson attended as
substitutes for Councillors McManus, Kelly, Duffy and Burgess respectively. 
CHAIR 
Councillor Brannan-McVey (Convener) presided. 
IN  ATTENDANCE 
Head of Housing, Property and Projects; Head of Housing Solutions; Head of Planning and Regeneration;
Business Finance Manager (Resource Solutions); Communications Officer and Committee Officer. 
APOLOGIES 
Councillors Burgess, Duffy, Kelly, McManus, McVey and Thomas. 
DECLARATIONS  OF  INTEREST  IN  TERMS  OF  THE  ETHICAL  STANDARDS  IN  PUBLIC  LIFE  ETC. 
(SCOTLAND)  ACT  2000 
1. Councillor M. Coyle, by his connection as a Board Member of Mears LLP, declared an interest in
respect of paragraph 2 – Mears LLP: Operational and Financial Performance Monitoring Report to
June 2022, and left the meeting during consideration of the item. 
Councillor Goldie, by his connection as a member of Sanctuary Housing Association, declared an
interest in respect of paragraph 14 - Millcroft Road, Cumbernauld – Compulsory Purchase Order, and
left the meeting during consideration of the item. 
Councillor Barclay, by her connection as a member of Sanctuary Housing Association, declared an
interest in respect of paragraph 14 - Millcroft Road, Cumbernauld – Compulsory Purchase Order, and
further declared that she considered the interest so sufficiently remote that it did not preclude her
participation in consideration of that matter. 
The Convener intimated that agenda item 19 “Contract Award for Retrofit of Sprinklers and Associated
Works – Phase 3 – 4 No. Tower Blocks North Lanarkshire” had been withdrawn. 
Councillor M. Coyle, prior to consideration of the following item of business, having declared an
interest by virtue of being a Board Member of Mears LLP, left the meeting during consideration of this
item.

Page 2

HOUSING  -  31 AUGUST 2022 
102
MEARS  LLP:   OPERATIONAL  AND  FINANCIAL  PERFORMANCE  MONITORING  REPORT  TO  JUNE 
2022 
2. With reference to paragraph 2 of the Minute of the meeting of the former Housing and Regeneration
Committee held on 24 November 2021, there was submitted a report by the Head of Housing, Property
and Projects (1) outlining Mears LLP’s (a) operational and financial performance against its business
objectives, council priorities and the Housing and Corporate Repairs and Maintenance Service
Delivery Contracts; (b) performance for financial years 2022/23 for both housing repairs and corporate
repairs; (c) Quarter 1 monitoring for the period up to 30 June 2022, and (d) financial performance as
at 31 March 2022, along with assurance of the financial standing of the ALEO by Financial Solutions;
(2) highlighting within the report, and the attached Appendices, details of the Performance Indicators
for Housing, Property and Projects and Corporate Property Projects and Performance, together with
the comparison of figures from the previous financial year;  (3) advising that the customer satisfaction
level was 95.56% in the year-to-date in comparison with the 2021/22 return to the Scottish Housing
Regulator when 94.79% of tenants were satisfied with the repairs service; (4) informing of the
requirement for a one-off modification to the existing conditions as detailed in Section 2.5.5 of the
report, and the financial impact of varying the calculation of the index, and (5) intimating that
performance against targets was submitted to the Audit and Scrutiny Panel on a six monthly bases. 
Decided: 
(1) that the operational performance of Mears LLP for Housing Repairs and Corporate Repairs
from 1 April to 30 June 2022 be noted; 
(2) that Mears LLP’s financial performance and financial standing for 2022/23 be noted; 
(3) that the one-off modification to the existing conditions as detailed in the report, and the
financial impact of varying the calculation of the index, be noted, and 
(4) that it be noted that a report confirming that the Governance and Risk Management
arrangements were suitably robust will continue to be submitted to the Audit and Scrutiny
Panel on a six monthly basis. 
SALTIRE  PERFORMANCE  REPORT 
3. With reference to paragraph 3 of the Minute of the meeting of the former Housing and Regeneration
Committee held on 24 November 2021, there was submitted a report by the Head of Housing, Property
and Projects (1) setting out the performance of the Housing Property Central Heating Repairs and
Maintenance service delivery contracts for 2022/23; (2) advising (a) of the performance against the
Key Performance Indicators (KPIs) for 2022/23 in relation to Heating Repairs and Maintenance, as set
out within Appendix 1 to the report, with Appendix 2 to the report containing the full KPIs set for 2021/22
for comparative purposes, and (b) that Appendix 3 to the report contained the full breakdown of
emergency and non-emergency repairs carried out; (3) highlighting the Housing Property and Projects
performance and developments in Section 2 of the report, and (4) providing details of the Stage 1 and
2 complaints received in 2022/23, together with the number of complaints received in 2021/22 for
comparative purposes. 
Decided: that the report be noted. 
ANNUAL  REVIEW  OF  HOUSING  ASSET  MANAGEMENT  PLAN  2021-2022 
4. With reference to paragraph 5 of the Minute of the meeting of the former Housing and Regeneration
Committee held on 17 February 2021 when, inter alia, the Housing Asset Management Plan 2021-26,
and Action Plan was approved, there was submitted a joint report by the Head of Housing, Property
Projects, Head of Housing Solutions, and the Head of Planning and Regeneration (1) providing an

Page 3

HOUSING  -  31 AUGUST 2022 
103
overview of the Annual Review of the Housing Asset Management Plan (HAMP); (2) informing that
the Action Plan contained 44 separate actions and 15 individual milestones, and provides a framework
for strategic review and reporting, and (3) recommending that the Annual Review of the HAMP, and
the updated Action Plan, attached as the Appendix to the report, be approved. 
Decided: 
(1) that the annual review of the Housing Asset Management Plan 2021-2022 and updated Action
Plan be approved, and 
(2) that the report be otherwise noted. 
VETERANS  SCOTLAND  -  HOUSING  MAINTENANCE  ARRANGEMENTS 
5. With reference to paragraph 10 of the Minute of the meeting of the former Housing and Regeneration
Committee held on 8 September 2021, when it had been agreed that the current repairs and
maintenance arrangements with Veterans Housing Scotland be extended for a further period of six
months until 31 March 2022, with the option to extend for a further period of 12 months, subject to the
agreement of both parties, there was submitted a report by the Head of Housing, Property and Projects
(1) providing an update on the housing repairs and maintenance agreement between North
Lanarkshire Council and the Veterans Scotland charity; (2) advising that on 11 April 2022 Veterans
Scotland contacted the Council to advise of its intention not to extend the current arrangement beyond
the expiry date of January 2024, and enquired whether the Council would be agreeable to an earlier
termination date, as it wished to implement new maintenance arrangements in line with those in place
throughout its property portfolio, and (3) intimating that (a) following detailed discussion with the
Council’s Legal Services Team, it had been agreed that the contractual agreement would be
terminated on 3 May 2022, which was agreed by both parties, and (b) that a final invoice had been
issued by the Council and had been fully settled in line with the Service Level Agreement, and all 26
properties had now been deleted from the Council’s repairs and maintenance system. 
Decided: that the report be noted. 
RAPID  REHOUSING  TRANSITION  PLAN:  ANNUAL  PROGRESS  AND  FUTURE  ACTIVITY 
6. With reference to paragraph 8 of the Minute of the meeting of the former Housing and Regeneration
Committee held on 19 May 2021, when, inter alia, the progress on the Year 1 and 2 Rapid Rehousing
Transition Action Plan and Year 3 Rapid Rehousing Transition Plan (RRTP) actions had been noted,
there was submitted a report by the Head of Housing Solutions (1) detailing the progress made in Year
3 of the RRTP and the activity planned in Year 4 to achieve the key objectives contained within the
Plan; (2) setting out the details of all future actions and development; (3) providing an overview of
activities planned to meet the RRTP objectives in Year 4, for which £443,000 of funding had been
provided by the Scottish Government, and (4) proposing that the activities set out in the Appendix to
the report be progressed. 
Decided: 
(1) that the progress made in Year 3 of the RRTP and the activity planned in Year 4 to achieve
the key objectives be noted; 
(2) that the progression of the RRTP activities set out in the report, and the Appendix to the report,
to effectively prevent and address homelessness in North Lanarkshire be approved, and 
(3) that the report be otherwise noted.

Page 4

HOUSING  -  31 AUGUST 2022 
104
SCOTTISH  HOUSING  REGULATOR:  2021/22  ANNUAL  ASSURANCE  STATEMENT 
7. With reference to paragraph 4 of the Minute of the meeting of the former Housing and Regeneration
Committee held on 8 September 2021, there was submitted a report by the Head of Housing Solutions
(1) seeking approval to sign off the third Annual Assurance Statement, attached at Appendix 1 of the
report; (2) intimating that the deadline for submission of the Annual Assurance Statement was
31 October each year, and (3) advising (a) that the Service required to comply with the regulatory
requirements set out in Chapters 3 and 5 of the Scottish Housing Regulator Framework, attached at
Appendix 2 to the report, and (b) that mechanisms had been put in place to support the approval of
this year’s Annual Assurance Statement, with these processes and actions continuing to be
maintained, monitored, reviewed and updated if necessary on a regular and ongoing basis. 
Decided: 
(1) that the signing of the Annual Assurance Statement 2021/22 by the Convener of the Housing
Committee be approved, and 
(2) that the report be otherwise noted. 
TENANT  PARTICIPATION  STRATEGY  –  ANNUAL  REVIEW 
8. With reference to paragraph 5 of the Minute of the meeting of the former Housing and Regeneration
Committee held on 8 September 2021 when, inter alia, the publication of the co-produced Tenant
Participation Strategy 2020-2025, and the actions/milestones achieved within the Action Plan, had
been noted, there was submitted a report by the Head of Housing Solutions (1) providing an update
on the annual review for 2021-22 of the Tenant Participation Strategy 2020-2025 – “Involving Tenants,
Improving Services”; (2) setting out the impact on this area of business due to the pandemic during
2021-22; (3) intimating that some of the milestones/activities had been adapted, as set out in the action
plan attached at Appendix 1 to the report, and (4) highlighting within the report, and the Appendices
to the report, plans to reconnect with communities as restrictions arising from the pandemic had eased. 
Decided: 
(1) that the impact on tenant participation due to the pandemic over the period of the annual
review 2021-22 be noted; 
(2) that the actions/milestones achieved as set out within the action plan, attached as Appendix
1 to the report, be noted; 
(3) that the plans to reconnect with communities as restrictions had now eased be noted, and 
(4) that the report be otherwise noted. 
HOUSING  DOMESTIC  ABUSE  POLICY 
9. There was submitted a report by the Head of Housing Solutions (1) seeking approval of a new Housing 
Domestic Abuse Policy which had been developed in partnership with the Violence Against Women
Partnership, and shaped by the views of women who had experience of domestic abuse, and
(2) outlining the background to the development of the Housing Domestic Abuse Policy, with Housing
Solutions setting out a clear commitment to tackling domestic abuse, through signing the "Make a
Stand" pledge, developed by the Chartered Institute of Housing, in partnership with Women's Aid and
the Domestic Abuse Alliance. 
C

Page 5

HOUSING  -  31 AUGUST 2022 
105
Decided: 
(1) that the effective partnership structures in place to tackle domestic abuse in North Lanarkshire,
in which Housing Services are an important and key partner, be noted; 
(2) that the positive progress made so far in relation to tackling domestic abuse be noted; 
(3) that the Housing Domestic Abuse Policy, attached as the Appendix to the report, developed
to strengthen and improve Housing Solutions response to meeting the needs of victims and
survivors of domestic abuse, be approved, and 
(4) that the report be otherwise noted. 
TENANCY  SUSTAINMENT  POLICY 
10. There was submitted a report by the Head of Housing Solutions (1) seeking approval of the Tenancy 
Sustainment Policy which had been developed in response to the continued focus on tenancy
sustainment, at a time when many tenants and residents were facing extreme pressures and may
require assistance; (2) outlining the background to, and the need for, the Tenancy Sustainment Policy,
and (3) intimating that the Policy would be subject to monitoring and review on an annual basis to
ensure effective implementation, and to support the development of best practice and tenancy
sustainment and homeless prevention activity. 
Decided: 
(1) that the Tenancy Sustainment Policy, attached as an Appendix to the report, be approved; 
(2) that the ongoing monitoring arrangements and annual review process be noted, and 
(3) that the report be otherwise noted. 
OPEN  MARKET  PURCHASE  SCHEME  -  PROGRAMME  OF  WORK  PO13(2) 
11. With reference to paragraph 6 of the Minute of the meeting of the former Housing and Regeneration
Committee held on 24 November 2021 when, inter alia, the targeted expansion of the Open Market
Purchase Scheme (OMPS) to support the common works programme was approved, and it was
agreed that a six monthly update report would be submitted to future meetings of the Committee, there
was submitted a report by the Head of Planning and Regeneration (1) outlining the background to the
OMPS which was an extension of the Empty Homes Purchase Scheme (EHPS); (2) setting out details
of the various stages and status of current purchases by the Council, from 1 April 2021 to 31 March
2022, through the OMPS; (3) advising (a) that the number of applications to the programme had been
lower so far this year compared to previous years, and (b) that to date, within North Lanarkshire, only
one owner had taken up the offer, and a number of other blocks had been identified where there was
only one remaining owner who would be approached to make them aware of the scheme; (4) indicating
that there was evidence that recent legislation changes, such as the lifting of the evictions ban
post-Covid, and current market conditions, had resulted in a reduction in available properties for rent
in Scotland, as a number of landlords had decided to sell their properties with vacant possession,
putting their tenants at risk of homelessness; (5) proposing that the Service explores (a) the potential
purchase of properties from private landlords where this would help prevent homelessness, on the
understanding that existing tenants would remain in the property and would become a Council tenant,
with suitable criteria being developed in line with current procedures, and (b) options to further expand
the Buy-Back Scheme, which would allow other properties to be acquired and brought back into
Council ownership, while allowing owners to remain in their home as tenants; (6) informing that an
update on any proposed further expansion of the scheme would be brought to a future meeting of the
C

Page 6

HOUSING  -  31 AUGUST 2022 
106
Committee for consideration, and (7) providing details of the first phase of the reprovisioning
programme. 
Following discussion it was agreed that a Briefing Note be sent to all Elected Members outlining the
background to the Open Market Purchase Scheme, together with the contact details of relevant
officers. 
Decided: 
(1) that the challenges in acquiring properties on the open market due to current market conditions
be noted; 
(2) that the targeted expansion of the scheme, as set out in Section 2.6 of the report, to help
prevent homelessness and enable private tenants to remain within their homes as Council
tenants be approved; 
(3) that a six monthly update report be submitted to future meetings of the Committee, which
would include options for further expansion of the scheme; 
(4) that a Briefing Note be sent to all Elected Members outlining the background to the Open
Market Purchase Scheme, together with the contact details of relevant officers, and 
(5) that the report be otherwise noted. 
PROGRAMME  OF  WORK  –  PO13(3)  –  STRATEGIC  HOUSING  INVESTMENT  PLAN  2023/24  – 
2027/28 
12. With reference to paragraph 9 of the Minute of the meeting of the former Housing and Regeneration
Committee held on 8 September 2021, there was submitted a report by the Head of Planning and
Regeneration (1) seeking approval to include a number of projects in the next Strategic Housing
Investment Plan (SHIP) 2023/24 – 2027/28 which would be submitted to the Scottish Government by
the deadline of 28 October 2022, subject to approval of this Committee; (2) outlining the background
to the SHIP, which identified affordable housing investment priorities that supported the achievement
of Local Housing Strategy objectives, and covered a five year period; (3) recommending that the SHIP
be submitted to the Scottish Government by the deadline of 28 October 2022; (4) intimating (a) that a
number of projects due to progress during the period 2023/24 – 2027/28 had been included within the
new SHIP, with the projects set out in Appendix 1 to the report, and (b) that all potential projects,
including the Council’s own new build projects, had been evaluated in terms of their deliverability and
the contribution to Local Housing Strategy priorities, and (5) recommending that all projects, as set out
in Appendix 2 to the report, be included within the SHIP for the period 2023/24 – 2027/28, and be
submitted for approval to the Scottish Government by the deadline of 28 October 2022. 
Decided: 
(1) that the projects previously approved for inclusion within the new SHIP, as set out in Appendix
1 of the report, be noted; 
(2) that the new projects for inclusion within the SHIP, as set out in Appendix 2 to the report, be
approved; 
(3) that the Strategic Housing Investment Plan 2023/24 – 2027/28 be submitted to the Scottish
Government by the deadline of 28 October 2022, and 
(4) that the reported by otherwise noted.

Page 7

HOUSING  -  31 AUGUST 2022 
107
FUTURE  NEW  BUILD  SITES 
13. With reference to paragraph 8 of the Minute of the meeting of the former Housing and Regeneration
Committee held on 8 September 2021, there was submitted a report by the Head of Planning and
Regeneration (1) reminding the Committee that the new supply programme aimed to deliver 5,000
new homes by 2035; (2) informing that, to date, 954 new build houses had been completed, with a
further 383 homes under construction; (3) proposing (a) that the sites at Kirkwood Sports Pitches,
Coatbridge – approximately 100 units; St. Mary’s former primary school site, Caldercruix –
approximately 25 units;  Thorn Road, Bellshill – approximately 26 units; Airdriehill Road, Airdrie –
approximately 75 units; Masonic Hall, Hope Street, Motherwell – approximately 10 units – potential
conversion of existing premises, and Main Street, Coatbridge – approximately 40 units, be included in
the New Build programme, and (b) that the purchase of “off the shelf” new homes be progressed as
part of the Affordable Housing Policy obligation for 12 new homes 4 x 2 bed cottage flats, and 8 x 3
bed terraced houses at Johnston Road, Gartcosh – Phase 2 (AHP) from Bellway Homes, with the
acquisition price being subject to a report to a future Finance and Resources Committee for
consideration, and with the site location plans included for each of the sites in Appendix 2 to the report;
(4) informing that (a) the projects at the Masonic Hall, Motherwell and Main Street, Coatbridge were
both priority town centre sites which support delivery of the Town Visions as part of the Council’s
commitment to Town Centre Regeneration, and (b) both projects were at an early stage of design
development/feasibility, and (5) indicating that consultation had taken place with local Elected
Members and the North Lanarkshire Federation of Tenants and Residents Association, and that no
objections had been received. 
Decided: 
(1) that the inclusion of the sites, as outlined in Section 2.1 and Appendix 2 of the report, within
the new-build programme be approved; 
(2) that the potential “off the shelf” purchase of completed homes at Johnston Road, Gartcosh –
Phase 2, as outlined in Section 2.3 of the report, be approved, and 
(3) that the report be otherwise noted. 
Councillor Goldie, prior to consideration of the following item of business, having declared an interest,
by virtue of being a member of Sanctuary Housing Association, left the meeting during consideration
of this item. 
Councillor Barclay, prior to the consideration of the following item of business, having declared a
connection by virtue of being a member of Sanctuary Housing Association, had further declared that
the connection was so sufficiently remote that it did not preclude her participation in consideration of
the matter. 
MILLCROFT  ROAD,  CUMBERNAULD  COMPULSORY  PURCHASE  ORDER 
14. With reference to paragraph 7 of the Minute of the meeting of the former Housing and Regeneration
Committee held on 24 November 2021, when, inter alia, authority had been given to the Head of Legal
and Democratic Solutions (1) to prepare all Compulsory Purchase Order documentation, and to take
all necessary steps including publication of all statutory notices to secure confirmation of the
Compulsory Purchase Order (CPO), for a number of properties at Millcroft Road, Cumbernauld, by
Scottish Ministers, and the vesting of the land and houses to the Council, and (2) to progress voluntary
acquisitions from owner occupiers in tandem with the promotion of the CPO, as set out within the
report, there was submitted a report by the Head of Planning and Regeneration (a) seeking approval
to write off debts due to the Council of £145,296.86 from owners of the properties at Millcroft Road,
Cumbernauld, which were currently secured to the Council by way of a Repayment Charge and Notice
of Payment of Grant, to further strengthen the case for the CPO at Millcroft Road, Cumbernauld being
confirmed by the Scottish Government (b) outlining the background to the requirement for the matter
to be addressed by the Council prior to submission of the CPO; (c) informing that, as part of the

Page 8

HOUSING  -  31 AUGUST 2022 
108
Council’s case for the CPO, as set out in its Statement of Reasons, it must demonstrate that it was
doing everything possible to support the re-housing of residents affected by the CPO, and to help
address the negative financial impact that the CPO may have on owners and residents, and (d)
proposing (A) that the Council support the re-housing of owner occupiers and residents; (B) that should
the CPO be confirmed, the Council consider further voluntary acquisitions ahead of the Vesting Date,
which would assist with the re-housing of owner occupiers, and with consideration being given to
voluntary acquisitions from other remaining owners, and (C) that owners and tenants of private
landlords be given full housing options advice regarding re-housing options, including through the
Common Housing Register, with residents being awarded priority points under the category of
demolition, following confirmation of the CPO, as well as other assessed housing need, in line with the
Council’s Housing Allocation Policy, which would assist with the re-housing process. 
Decided: 
(1) that the write-off of debts, as detailed in Section 2 of the report, amounting to £145,296.86 to
support the confirmation of a Compulsory Purchase Order (CPO) at Millcroft Road,
Cumbernauld be approved; 
(2) that the voluntary acquisition of further properties at Millcroft Road, Cumbernauld, should the
CPO be confirmed by the Scottish Government, be approved; 
(3) that the allocation of priority points, under category of demolition, to residents of Millcroft Road,
Cumbernauld to assist with re-housing following confirmation of the CPO be approved, and 
(4) that the report be otherwise noted. 
NEW  HOUSING  SUPPLY  PROGRAMME  –  PROCUREMENT  REPORT 
15. With reference to (1) paragraph 16 of the Minute of the meeting of the former Housing and
Regeneration Committee held on 19 May 2021, and (2) paragraph 8 of the Minute of the meeting of
the former Housing and Regeneration Committee held on 24 November 2021, there was submitted a
report by the Head of Planning and Regeneration (a) providing an update on the current procurement
activity relating to the New Build Programme, and (b) proposing (A) that in line with the Scottish
Procurement Alliance (SPA) H2 Framework Agreement Conditions the construction of new build
housing at Graham Street, Wishaw, up to the revised value of £3.25m; at King Street, Wishaw, up to
the revised value of £1.25m; at Stewarton Street, and Kings House, King Street, Wishaw, up to the
revised value of £4.25m, and at the former Methodist Church site, Caledonian Road, Wishaw, up to
the revised value of £2.25m, be awarded to Hadden Construction Limited, with all projects including a
contingency allowance; (B) that in line with the Scotland Excel New Build Residential Framework, the
contract for construction of new build housing at (i) Ravenscliff Road, Motherwell, up to the revised
value of £5.4m, be awarded to CCG (Scotland) Limited, and (ii) at Glenacre Drive, Airdrie, up to the
value of £3.55m, be awarded to McTaggart Construction, with both projects including a contingency
allowance, and (C) that the Council would engage with contractors on the Scottish Procurement
Alliance (SPA) (H2) Framework for the projects at Coshneuk Road, Millerston, up to the value of £4m,
and at Main Street, Glenboig, up to the value of £1.5m. 
Decided: 
(1) that call-off contracts in line with the Scottish Procurement Alliance (SPA) H2 Framework
Agreement Conditions for the construction of new build housing at Graham Street, Wishaw,
up to the revised value of £3.25m, at King Street, Wishaw, up to the revised value of £1.25m,
at Stewarton Street, and Kings House, King Street, Wishaw, up to the revised value of £4.25m,
and the former Methodist Church site, Caledonian Road, Wishaw, up to the revised value of
£2.25m, be awarded to Hadden Construction Limited, with all projects including a contingency
allowance;

Page 9

HOUSING  -  31 AUGUST 2022 
109
(2) that a call-off contract in line with the Scotland Excel New Build Residential Framework for the
construction of new build housing at Ravenscliff Road, Motherwell, up to the revised value of
£5.4m, be awarded to CCG (Scotland) Limited, including contingency allowance; 
(3) that a call-off contract in line with the Scotland Excel New Build Residential Framework for the
construction of new build housing at Glenacre Drive, Airdrie, up to the value of £3.55m, be
awarded to McTaggart Construction, including contingency allowance; 
(4) that the Council engage with the contractors on the Scottish Procurement Alliance (SPA) (H2)
Framework for the two projects at Coshneuk Road, Millerston, up to the value of £4m, and at
Main Street, Glenboig, up to the value of £1.5m, and   
(5) that the report be otherwise noted. 
GENERAL DEBTORS WRITE-OFF 2022 
16. There was submitted a report by the Head of Housing Solutions (1) providing a summary of
outstanding debtor accounts which were deemed uncollectable following all attempts to recover or
which were considered uneconomically viable to continue pursuing, and for debts under £500,
amounting to £168,653.09 and written-off by the Head of Financial Solutions under delegated powers;
(2) proposing that those debts greater than £500, amounting to £293,699.20, be written-off, with an
analysis of the total write-off being detailed within the report, and (3) advising that the Council would
continue to make every effort to collect outstanding debts. 
Decided: 
(1) that it be noted that the Head of Financial Solutions had written-off debts under £500,
amounting to £168,653.09, which were deemed to be uncollectable; 
(2) that a write-off of a number of debts over £500 to the value of £293,699.20 be approved; 
(3) that the report be remitted to the Finance and Resources Committee for consideration, and 
(4) that the report be otherwise noted. 
REVENUE  BUDGET  MONITORING  REPORTS 
(1)  REVENUE  MONITORING  REPORT  –  HOUSING  REVENUE  ACCOUNT 
17. There was submitted a report by the Deputy Chief Executive (1) providing a summary of the Housing
Revenue Account Financial Performance for the period from 1 April to 22 July 2022 (Period 4); (2)
illustrating the projected outturn as at 31 March 2023, with major outturn variances highlighted and
explained in accordance with the Council’s approved Financial Regulations, and (3) advising (a) that
the Service was currently projecting a break-even position for the financial year, and (b) that it was
anticipated that £1.849m of savings would be delivered by the financial year-end. 
Decided: that the financial position of the HRA Revenue Budget 2022/23 be noted. 
(2)  ENTERPRISE  AND  COMMUNITIES  –  REVENUE  MONITORING  REPORT 
18. There was submitted a report by the Deputy Chief Executive (1) highlighting the financial performance
of the Enterprise and Communities Service for the period from 1 April to 22 July 2022 (Period 4);
(2) illustrating the projected outturn as at 31 March 2023, with major outturn variances highlighted and

Page 10

HOUSING  -  31 AUGUST 2022 
110
explained as per the Council’s approved Financial Regulations, and (3) advising, at this early stage in
the financial year, that the Enterprise and Communities Service was forecasting a year-end balanced
budget position. 
Decided: that the financial position of the 2022/23 Enterprise and Communities Revenue
Budget be noted. 
CAPITAL  PROGRAMMES  MONITORING  REPORTS 
(1)  HRA  CAPITAL  MONITORING  REPORT  – 1  APRIL  TO  22  JULY  2022 
19. There was submitted a report by the Deputy Chief Executive (1) reviewing progress towards agreed
spending plans within the 2022/23 HRA Capital Programmes, and (2) advising that at this stage in the
year all programmes were on target for full spend. 
Decided: that the financial position of the 2022/23 HRA Capital Programmes be noted. 
(2)  ENTERPRISE  AND  COMMUNITIES  –  CAPITAL  MONITORING  REPORT 
20. With reference to paragraph 5 of the Minute of the meeting of the Policy and Strategy Committee held
on 30 September 2021, when, inter alia, it had been agreed to note the Medium Term Financial Plan
2022/23 to 2026/27, there was submitted a report by the Deputy Chief Executive (1) highlighting the
financial performance of the 2022/23 Enterprise and Communities Capital Programme for the period
from 1 April to 22 July 2022 (Period 4); (2) advising that the Service had a total Capital Budget of
£178.647m, and that at this stage in the financial year, the Service was currently forecasting a
break-even position, and (3) providing further explanation of project variances and management action
taken by the Service as set out in the report and the attached Appendices. 
Decided: that the financial position of the 2022/23 Enterprise and Communities Capital
Programme be noted. 
CONTRACT  AWARD  FOR  RETROFIT  OF  SPRINKERS  AND  ASSOCIATED  WORKS  –  PHASE  3-4 
NO.  TOWER  BLOCKS  NORTH  LANARKSHIRE 
21. This item was withdrawn. 
CONTRACTS  FOR  NOTING 
(1)  CONTRACT  AWARD  FOR  THE  PROVISION  OF  A  PAYMENT  SOLUTION  FOR  TOWER        
LAUNDRIES 
22. There was submitted a report by the Head of Housing Solutions (1) informing of a contract award
made for the provision of a Payment Solution for Tower Laundries to Electrolux Professional Services,
utilising the Negotiated Tendering Procedure (NTP), and (2) advising that the contract was for an initial
period of 36 months commencing on 1 February 2022, with the maximum contract value of £93,120. 
Decided: that the report be noted.

Page 11

HOUSING  -  31 AUGUST 2022 
111
(2)  CONTRACT  AWARD  FOR  MEASURED  TERM  CONTRACT  –  BITUMEN  MACADAM  (BITMAC)       
REPAIRS  2022-26 
23. There was submitted a report by the Head of Housing Property and Projects seeking homologation of
the decision taken by the Deputy Chief Executive in awarding the Measured Term Contract for Bitumen
MacAdam (Bitmac) Repairs 2022-26 – Lot 1 – Corporate to John McGeady Limited, up to the
maximum value of £2.8m, including an extension period, and for Lot 2 – Housing – to Hillhouse Quarry
Group Limited, up to the maximum value of £3.9m, including an extension period, with the contract for
both Lots being for an initial 18 month period, with the option to extend for additional periods up to a
maximum of a further 24 months, at the sole discretion of the Council. 
Decided: that the report be noted. 
(3)  CONTRACT  AWARD  FOR  MEASURED  TERM  CONTRACT  UPVC  DOOR  AND  WINDOW        
REPAIRS  AND  MAINTENANCE  2022-2026 
24. There was submitted a report by the Head of Housing Property and Projects seeking homologation of
a decision taken by the Deputy Chief Executive in awarding the Measured Term Contract for UPVC
Door and Window Repairs and Maintenance 2022-2026 to Walker Profiles Limited, with the contract
being for an initial period of 20 months, with the option to extend for additional periods, to a maximum
of a further 24 months, at the sole discretion of the Council, up to the maximum value of the contract
of £7.5m. 
Decided: that the report be noted. 
CONTRACTS  AWARDED  BELOW  COMMITTEE  APPROVAL  THRESHOLD 
25. There was submitted a report by the Head of Asset and Procurement Solutions intimating that the
contracts highlighted within Appendix 1 to the report, had been awarded by him in accordance with
the General Contract Standing Orders during the period 1 January to 30 June 2022. 
Decided: 
(1) that the contracts awarded by the Head of Asset and Procurement Solutions in the reported
period from 1 January to 30 June 2022 be noted, and 
(2) that the report be otherwise noted.