North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref TM/KD Date 31/08/22 
Future New Build Sites 
From  Pamela Humphries, Head of Planning & Regeneration 
E-mail divink@northlan.gov.uk Telephone Kevin Divin, 07583 089
510 
1. Background 
1.1 The council has an approved target to deliver 5,000 new homes by 2035, which
although predominantly new build homes also includes properties purchased through
the council’s Buy Back Schemes. To date, 954 new build homes have been completed,
with a further 383 homes under construction. In addition, 570 homes have been
purchased through the Buy Back schemes as at 12th July 2022.  A summary of progress
with the new build programme is attached at Appendix 1   
Executive Summary
The council has an adopted target to deliver 5,000 new affordable rented homes by 2035.
To date 954 new build houses have been completed with a further 383 homes under
construction. To ensure an adequate supply of sites for the new build programme, potential
council owned sites continue to be evaluated for their suitability for inclusion within the
programme. The sites outlined within this report have been assessed and are
recommended for inclusion within the new-build programme subject to the conclusion of
detailed ground investigations, full title checks and appropriate statutory consents. 
Recommendations
It is recommended that the Committee
1) Approves the inclusion of the proposed sites, as outlined in section 2.1 and
Appendix 2 of this report, within the new-build programme.
2) Approves the potential off the shelf purchase of completed homes at Johnston
Road, Gartcosh - Phase 2 as outlined in section 2.3  
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth

Page 2

2. Report 
2.1  To ensure an adequate supply of sites for the new build programme, potential sites
continue to be evaluated for their suitability for inclusion within the programme. The
sites outlined below have been identified and are recommended for inclusion within the
new-build programme subject to the conclusion of detailed ground investigations, full
title checks and relevant statutory consents. It is proposed that development be
considered at the following sites: 
• Kirkwood Sports Pitches, Coatbridge – approximately 100 units.  
• St Mary’s former primary school site, Caldercruix – approximately 25 units.  
• Thorn Road, Bellshill – approximately 26 units
• Airdriehill Road, Airdrie – approximately 75 units
• Masonic Hall, Hope Street, Motherwell – approximately 10 units (potential
conversion of existing premises)
• Main Street, Coatbridge – approximately 40 units 
2.2 The proposed projects at the Masonic Hall, Motherwell and Main Street, Coatbridge
are both priority town centre sites which support delivery of the Town Visions as part of
the council’s commitment to town centre regeneration.  Both projects are at an early
stage of design development / feasibility.  The land assembly is still progressing at Main
Street, Coatbridge and may require a Compulsory Purchase Order. 
2.3 It is also proposed to progress the potential ‘off the shelf’ purchase at the following
location, as part of the Affordable Housing Policy obligation that applies to this sites: 
• 12 new homes (4 x 2-bed cottage flats and 8 x 3-bed terraced houses) at Johnston
Road, Gartcosh - Phase 2 (AHP) from Bellway; 
The acquisition price will be subject to a future report to Finance and Resources
Committee. 
2.4 Site location plans are included for each of these sites within Appendix 2 to this report. 
2.5 Consultation with local elected members and North Lanarkshire Federation of Tenants
and Residents Associations has been undertaken for both the new build and proposed
off the shelf acquisition and no objections to these sites have been received. 
3. Measures of success 
3.1  The success of the council’s new supply programme is measured in terms of: 
• Achievement of target completions of 5,000 completions by 2035.
• Delivery of projects within budget.
• Quality of housing delivered.   
4. Supporting documentation 
Appendix 1  Summary of New Build programme
Appendix 2 Site Locations

Page 3

Pamela Humphries
Head of Planning & Regeneration

Page 4

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The new build programme includes measures that will help reduce inequalities of
outcome through certain design features including: 
• Housing for Varying Needs to make homes as accessible as possible;
• Secure by Design to make homes and the surrounding environment as safe
and secure as possible.
• Achieving the Scottish Government requirements for Greener Homes to
• reduce the incidence of fuel Poverty.
• Facilitating improved access to high speed internet capabilities including
installation of ‘fibre to the property’.  
• The above features are also part of the specification requirement for off the
shelf properties. 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☒ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The cost of constructing or purchasing these homes will be contained within the overall
budget for the new build programme within the Housing Revenue Account.  There is
a grant from the Scottish Government towards the cost of the new homes which is
from a minimum of £71,500 per unit 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?

Page 5

5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☒
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
There are no direct Technology/Digital impacts directly arising from this report. The
scope of the new homes includes Cat5e cabling to support home networking and Fibre
to the Premises (FTTP) for digital connectivity as part of the ‘future-proofing’ of North
Lanarkshire Council’s new housing stock.  This is also part of the specification
requirement for off the shelf properties. 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Intrusive ground investigations will be undertaken as part of the due diligence
associated with determining the suitability of sites for development. This is undertaken
in liaison with North Lanarkshire Council’s Environmental Health (Pollution Control) to
ensure that appropriate investigations are undertaken. 
The new homes are built to higher energy efficiency and sustainability standards,
which helps to reduce future carbon emissions from the properties. This is done via a
fabric first approach to development, while incorporating renewable technologies
where appropriate. 
The Council’s New Supply Programme will ensure that the impact on the Council’s
carbon footprint is mitigated. The specifications incorporated within the contract
documentation will: deliver reduced energy need; encourage sustainable construction;
promote health and wellbeing; reduce waste and resources through effective storage,
collection and composting of waste and recyclable materials and; include measures
which will reduce CO2 emissions). For off the shelf purchases all such statutory
consents would apply and other considerations are included in the negotiations
including specification agreement between the Council and Developers prior to
acquisition.

Page 6

5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
Risk associated with the New Supply Programme is managed within the Enterprise &
Communities Resources Risk Register process. By undertaking detailed Ground
Investigation and other relevant site assessments, prior to proceeding with the
development of any particular site, the council is mitigating the risk of unforeseen costs
relating to ground conditions, although this risk cannot be eliminated entirely.  In the
case of off the shelf purchases these risks are borne by the developer.

Page 7

Appendix 1  New Build Sites Summary

Page 8

Chryston Chilterns Care Home 21 On Site
Plains Plains PS 16 On Site
Airdrie Dykehead Road (Holehills) 150 On Site
Airdrie Northburn Place 31 On Site
Bellshill Community Road 29 On Site
Airdrie Former Orrs Building (Wilson) 20 On Site
Wishaw Castlehill Road, Gowkthrapple (Phase 1) 97 On Site
Coatbridge Berwick St 19 On Site
Sub total 383 On site
Cumbernauld Community Growth Area 75 Site currently being marketed
Motherwell Mabel Street 20 Planning app approved
Glenmavis McArthur Ave 21 Planning app approved
Coatbridge Columba High School 130 Design development underway
Viewpark Laburnum Rd 26 Planning app approved
Coatbridge Bank Street 9 Planning app approved
Airdrie Glenacre Drive 16 Planning app approved
Chapelhall Gibb Street 25 Planning app submitted
Wishaw Graham Street 13 Planning app submitted
Coatbridge Kildonan Street 49 Design development underway
Cumbernauld Former Cumbernauld Village PS 8 Planning app approved
Glenboig Former Police Station, Main Street 7 Planning app submitted
Motherwell Brandon Street 48 Planning app approved
Wishaw King Street 5 Planning app submitted
Wishaw Stewarton Street & Kings House 17 Design development underway
Motherwell Former BRE, Ravenscliff Rd, Ravenscraig 24 Planning app submitted
Motherwell Former Motherwell Town Hall 20 Planning app approved
Airdrie Calderigg Place 42 Design development underway
Airdrie Former Petersburn PS 40 Planning app submitted
Millerston Coshneuk Road 16 Approved at Committee - Sept 2021
Wishaw Caledonian Road 9 Planning app submitted
Sub total 620 Design development underway
Coatbridge Shawhead 111 Re-provisioning site
Coatbridge Dunbeth 170 Re-provisioning site
Motherwell Coursington 60 Re-provisioning site
Sub total 341 Re-provisioning sites
R
e
-
p
r
o
v
i
s
i
o
n
i
n
g
O
n
S
i
t
e
D
e
s
i
g
n
D
e
v
e
l
o
p
m
e
n
t
U
n
d
e
r
w
a
y
Chryston Gartferry Road (Allanwater) 22
Off the shelf                                   
Purchase approved at Committee
Stepps Gateside / Hornshill Farm (Barratt) 30
Off the shelf                                   
Purchase approved at Committee
Coatbridge Lorne Place (Allanwater) 24
Off the shelf
Purchase approved at Committee
Moodiesburn Auchengeich, Gartferry Road (Bellway) 12
Off the shelf
Purchase approved at Committee
Cumbernauld Kingfisher, Dowanfield Road (Zoom) 24
Off the shelf
Purchase approved at Committee
Coatbridge
Former DWP Offices, South Circular Road
(ML5 Limited) 39
Off the shelf
Purchase approved at Committee
Sub total 151
Future off the shelf purchases from
developers
Total 2449
O
f
f
T
h
e
S
h
e
l
f

Page 9

Appendix 2  General Outline of Site Locations 
• Kirkwood Sports Pitches, Coatbridge – approximately 100 units: 
• Former St Mary’s PS, Caldercruix – approximately 25 units:

Page 10

• Thorn Road, Bellshill – approximately 26 units 
• Airdriehill Road, Airdrie – approximately 75 units 
• Masonic Hall, Hope Street, Motherwell  – approximately 10 units

Page 11

• 12 new homes (4 x 2-bed cottage flats and 8 x 3-bed terraced houses) at Johnston Road,
Gartcosh - Phase 2 (AHP) from Bellway;

Page 12

• Main Street, Coatbridge – approximately 40 units