Agenda Document Pack - Housing Committee - 12/02/2025

North Lanarkshire Council · 12 February 2025
Back to Housing Committee — 12 February 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

3 February 2025 
Members of the 
Housing Committee
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Housing Committee is to be held in the Council
Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on Wednesday, 12
February 2025 at 10:00 AM which you are requested to attend. 
The agenda of business is attached. 
Archie Aitken
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Clare Louise McDonald
Clerk Telephone: 07350 435308
Clerk Email: committee@northlan.gov.uk 
M McPake, A Bustard, H Brannan-McVey, G Brennan, B Burgess, T Carragher, M Coyle, S
Coyle, P Di Mascio, H Dunbar, T Fisher, F Fotheringham, H Gray, K Harmon, J Jones, J
Keltie, A Khan, K Larson, J Leckie, G Lennon, J Logue, F MacGregor, M McCulloch, F
McKay, R McKendrick, C McManus, A McVey, L Mitchell, L Nolan, P Patton, C Quigley, J
Reddin, G Robinson, N Shevlin, A Smith, A Stubbs, L Stubbs, R Sullivan, J Toner, S
Watson.  
Page 1 of 198

Page 2

Page 2 of 198

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000   
Operational   
2 Ministerial response to correspondence on the five
week wait for Universal Credit assistance
Submit report by the Chief Officer (Housing) attaching
the ministerial response received on the 13 January
2025 to the letter sent by the Convener of the Housing
Committee and the Leader of the Council on the 2
September 2024. 
7 - 16 
3 New Supply Programme - Open Market Purchase
Scheme
Submit report by the Chief Officer (Place) providing an
update on the progress of the Open Market Purchase
Scheme. 
17 - 24 
4 New Supply Programme – Programme Expansion
Submit report by the Chief Officer (Place) providing an
update on a review carried out to identify opportunities
for the potential expansion of the New Supply
programme. 
25 - 36 
5 Local Housing Strategy Annual Progress Report
Submit report by the Chief Officer (Housing) advising of
the progress made in delivering the strategic priorities
and actions set out in the Local Housing Strategy
2021-2026. 
37 - 92  
Financial   
6 Housing Outline HRA Capital Programme 2025/26
Submit report by the Chief Officer (Housing) seeking
approval of the mainstream Housing Capital
Programme (excluding new supply) for 2025/26. 
93 - 104
Page 3 of 198

Page 4

7  HRA Capital Monitoring Report - 1 April to 6
December 2024
Submit report by the Depute Chief Executive reviewing
the progress towards agreed spending plans within the
2024/25 HRA capital programmes. 
105 - 112 
8 Enterprise and Communities - Capital Monitoring
Report
Submit report by the Depute Chief Executive
highlighting the financial performance of 2024/25
Enterprise and Communities capital programme for the
period ended 3 January 2025 (Period 10). 
113 - 120 
9 Revenue Monitoring Report - Enterprise and
Communities
Submit report by the Depute Chief Executive
summarising the financial performance of the
Enterprise and Communities service for the period 1
April 2024 to 3 January 2025 (Period 10) and
illustrating the provisional outturn as at 31 March 2025. 
121 - 134 
10  Revenue Monitoring Report - Housing Revenue
Account
Submit report by the Depute Chief Executive
summarising the Housing Revenue Account financial
performance for the period 1 April 2024 to 3 January
2025 (Period 10). 
135 - 142 
11  Former Tenant Arrears Write Off to 31 March 2023
Submit report by the Chief Officer (Housing) providing
a summary of outstanding Housing Rent debts which
are deemed uncollectable following all attempts at
recovery by the Housing Rents and Court teams or are
considered uneconomically viable to continue pursuing. 
143 - 148 
12  New Housing Supply Programme – Procurement
Update
Submit report by the Chief Officer (Place) (1) providing
an update on current procurement activity relating to
the new build housing programme and (2) seeking
approval to progress procurement arrangements. 
149 - 156  
Contracts   
Page 4 of 198

Page 5

13  Contract Award for Garden Assistance Scheme and
Ad-hoc Garden Works 2025-2028
Submit report by Chief Officer (Housing) seeking
approval to award the contract for Garden Assistance
Scheme & Ad-Hoc Garden Works 2025 - 2028. 
157 - 170 
14  Homologated Contract Award for Jackson Court
Demolition
Submit report by the Chief Officer (Housing) informing
of action taking by the Depute Chief Executive to
award the contract for the demolition of Jackson Court
to Dem-Master Demolition Ltd. 
171 - 182 
15  Homologated Contract Award for the Provision of
Retrofit and Contractor Design Appraisal
Consultancy Services for Re-Roofing, Re-
Rendering and Energy Efficiency Works
Submit report by the Chief Officer (Housing) informing
of action taking by the Depute Chief Executive to
award the contract for The Provision of Retrofit and
Contractor Design Appraisal Consultancy Services for
Re-Roofing, Re-Rendering and Energy Efficiency
Works to ECD Architects Limited. 
183 - 194 
16  Contract Awarded Below Committee Approval
Threshold
Submit report by the Chief Officer (Assets and
Procurement) summarising the contract awarded since
the last meeting of the Committee. 
195 - 198  
EXCLUSION OF PUBLIC
The Sub-Committee is asked to consider passing the
following resolution: "That under Section 50A(4) of the
Local Government (Scotland) Act 1973, the public be
excluded from the meeting for the following item of
business on the grounds that it involves the likely
disclosure of exempt information as defined in
paragraphs 2 and 4 of Part 1 of Schedule 7A of the
Act". 
17  Reinforced Autoclaved Aerated Concrete (RAAC) -
Housing
Submit report by the Chief Officer (Housing) providing
an update on the activities undertaken to identify
Reinforced Autoclaved Aerated Concrete (RAAC)
within the Council’s housing stock. 
Page 5 of 198

Page 6

18  Transforming Places – Coursington Towers
Demolition
Submit report by the Chief Officer (Housing) providing
an update on the options considered and the
recommended methodology for demolition of
Coursington, Allan and Draffen Towers, Motherwell. 
Page 6 of 198

Page 7

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    SL/MK Date 12/02/25 
Ministerial response to correspondence on the five week wait for
Universal Credit assistance 
From  Stephen Llewellyn, Chief Officer (Housing)  
E-mail llewellyns@northlan.gov.uk Telephone 07939280680 
Executive Summary 
A decision was made at Housing Committee on 28 August 2024 that the Housing Convener
and Leader of the Council would jointly write to the UK Government Chancellor of the
Exchequer and the Secretary of State for Work and Pensions to request that the waiting
period for Universal Credit, following successful application is removed, and Universal
Credit payments are started immediately in order to remove the significant stress and worry
experienced by constituents across North Lanarkshire who are claiming or migrating to
Universal Credit, and to allow the Council to reallocate resources to other areas. 
This report provides an update on the ministerial response received on the 13 January
2025 to the correspondence sent by the Convener of Housing and the Leader of the
Council on the 2 September 2024. 
Recommendations
It is recommended that the Housing Committee: 
(1) Acknowledge the ministerial response received from the Minister of State for Social
Security and Disability, the Rt Hon Sir Stephen Timms.  
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement
(11) Increase economic opportunities for adults by understanding,
identifying, and addressing the causes of poverty and deprivation
and barriers to financial inclusion
Programme of Work Statutory / corporate / service requirement
Item 2
Page 7 of 198

Page 8

1. Background 
1.1 A decision was made at Housing Committee on 28 August 2024 that the Convener of
Housing and the Leader of the Council would jointly write to the UK Government
Chancellor of the Exchequer and Secretary of State for Work and Pensions to request
that the waiting period, following successful application is removed, and Universal
Credit payments are started immediately in order to remove the significant stress and
worry experienced by constituents across North Lanarkshire who are claiming or
migrating to Universal Credit, and to allow the Council to reallocate resources to other
areas. 
2. Report 
2.1  The Convener of Housing and the Leader of the Council wrote to the UK Government 
Chancellor of the Exchequer and Secretary of State for Work and Pensions on the 2
September 2024 highlighting the adverse impact of this policy and requesting the
waiting period is removed. 
2.2  This correspondence set out that full local transition to Universal Credit is expected to 
be realised in North Lanarkshire over the next two years and that despite many positive
initiatives to tackle poverty, reduce employment activity and generate income,
communities continue to experience financial hardship. It sets out that the five week
wait for Universal Credit compounds financial hardship, increases vulnerability and
pushes more people into debt, which in turn increases requests for assistance and
support from the Council. This correspondence is attached as Appendix 1 to this report. 
2.3  An official ministerial response to this correspondence was received on the 13 January
2025 from the Minister of State for Social Security and Disability, to whom the
correspondence was passed for response. 
2.2.1 The response sets out a commitment to conduct a review of Universal Credit as set out
in the election manifesto and that intentions for this will be set out shortly, which will
include the matters highlighted in relation to the five week wait contained within the
correspondence from the Convener of Housing and the Leader of the Council. 
3. Measures of success 
3.1 Poverty and financial hardship are reduced so people in North Lanarkshire can thrive
and prosper. 
4. Supporting documentation 
4.1 Appendix 1 – Correspondence from the Convener of Housing and the Leader of the
Council sent to the UK Chancellor of the Exchequer and the Secretary of State for Work
and Pensions. 
4.2 Appendix 2 – Ministerial response. 
Page 8 of 198

Page 9

Stephen Llewellyn
Chief Officer (Housing) 
Page 9 of 198

Page 10

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
The five week wait policy has socio-economic impact and there are equalities impact
due to people who share some protected characteristics being more at risk of
experiencing poverty.  However, this report has no specific impacts – this matter is
devolved to Uk Government. 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Page 10 of 198

Page 11

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Similar to what is set out above in section 5.1 there are specific impacts for children
and families arising from the five week wait for Universal Credit. However, this
specific report contains no specific impacts. 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles
from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Page 11 of 198

Page 12

Yes ☐ No ☐ 
Page 12 of 198

Page 13

Appendix 1 – Correspondence from the Convener of Housing and the Leader of the
Council 
Page 13 of 198

Page 14

Page 14 of 198

Page 15

Appendix 2 – Ministerial Response 
Page 15 of 198

Page 16

Page 16 of 198

Page 17

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    PH/FD Date 12/02/25 
New Supply Programme - Open Market Purchase Scheme 
From  Pamela Humphries, Chief Officer (Place)  
E-mail dicksonf@northlan.gov.uk Telephone
Fiona Dickson
Development Officer
07581 034779 
Executive Summary
The purpose of this report is to update the Housing Committee on the progress of the Open
Market Purchase Scheme (OMPS). The OMPS enables acquisition of privately owned
properties, with a particular focus on former public sector housing stock. This report aims
to highlight the scheme’s progress, emphasising its impact and the benefits achieved. 
Recommendations
It is recommended that the Housing Committee: 
(1) Review the report’s contents and acknowledge the Open Market Purchase
Scheme’s performance in helping to increase housing supply and improve stock
condition. 
(2) Acknowledge recent progress regarding acquisition of 99 Stanhope Place,
Gowkthrapple, as set out in section 2.8.   
(3) Acknowledge that a further update to be provided to the Housing Committee in 6
months. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth
Programme of Work Transforming Places
Item 3
Page 17 of 198

Page 18

1. Background 
1.1 The purpose of this report is to present an update on the Open Market Purchase
Scheme (OMPS), which incorporates the Empty Homes Purchase Scheme (EHPS).
The primary objective of the Open Market Purchase Scheme is to contribute to the
Council's New Supply programme, by increasing housing supply. 
1.2 In 2013, the Council implemented a scheme with the objective of acquiring empty
homes. The primary aim was to address issues of disrepair and the negative impact on
the surrounding areas caused by these long-term vacant properties. Since inception,
the Empty Homes Purchase Scheme has brought 395 long term empty properties back
into use. 
1.3  In addition to the Empty Homes Purchase Scheme, the Enterprise and Housing
Committee approved the development and implementation of an Open Market
Purchase Scheme on 15th February 2018 and set a target of acquiring 100 properties
per annum. Surpassing expectations, a total of 130 homes were purchased in 2018/19.
Similarly, in the following year, the number exceeded expectations again, with a total
of 143 properties purchased in 2019/20. Despite the challenges posed by the Covid
pandemic, 106 properties were acquired in 2020/21. However, in 2021/22, the
competitive housing market led to a lower figure of 75 properties purchased, falling
short of the ambitious target of 130. For 2022/23, a more modest target of 50 properties
was set, with 70 properties being purchased in total. Due to overwhelming demand for
the scheme in 2023/24, the target of 100 properties was surpassed with 126 homes
purchased. 
1.4 In November 2021, the Housing & Regeneration Committee approved the expansion
of the OMPS which now allows the council to acquire homes that would enable common
works to progress in priority blocks and allow the only remaining owner occupier to
remain in their property as a council tenant. 
1.5 In August 2022, the Housing & Regeneration Committee approved the further
expansion of the OMPS to now consider buying homes from private landlords and
allowing the private tenant to remain in the home as a council tenant to help prevent
homelessness and increase the council’s housing stock. 
2. Report 
2.1 The Open Market Purchase Scheme has proved to be popular with over 3430
enquiries/applications. Staff also proactively engage with Estate Agents throughout all
regions of North Lanarkshire. As at 23/12/24, 60 properties have been purchased,
against a target of 100 properties. A further 24 properties are with Legal for
conveyancing. 
The locations of the properties purchased are outlined below: 
2023/24   2024/25 
Area Number of
Properties 
Area Number of
Properties 
Airdrie 41  Airdrie 10
Bellshill 5  Bellshill 4
Coatbridge 23  Coatbridge 15
Cumbernauld 6  Cumbernauld 4
Kilsyth 5  Kilsyth 1
Page 18 of 198

Page 19

Moodiesburn 8  Moodiesburn 1
Motherwell 15  Motherwell 9
Shotts 5  Shotts 2
Viewpark 3  Viewpark 3
Wishaw 15  Wishaw 11
Total 126  Total 60 
2.2 Apartment size by area: 
2 Apartment
- 1 bedroom
3 Apartment
- 2 bedroom
4 Apartment
- 3 bedroom
5 Apartment
- 4 bedroom
Airdrie
2023/24 6 17 17 1
2024/25 1 5 4 0
Bellshill
2023/24 1 4 0 0
2024/25 1 3 0 0
Coatbridge
2023/24 3 11 9 0
2024/25 1 5 8 1
Cumbernauld
2023/24 0 2 4 0
2024/25 1 1 2 0
Kilsyth
2023/24 2 1 1 1
2024/25 0 1 0 0
Moodiesburn
2023/24 2 4 2 0
2024/25 0 1 0 0
Motherwell
2023/24 0 5 10 0
2024/25 1 6 1 1
Shotts
2023/24 0 4 1 0
2024/25 0 1 1 0
Viewpark
2023/24 0 3 0 0
2024/25 1 2 0 0
Wishaw
2023/24 2 10 3 0
2024/25 2 6 3 0 
2.3 Of the properties purchased in 2024/25, a total of 21 properties are classified as long-
term empty properties. Additionally, 14 properties have been purchased through the
Open Market Purchase Scheme, which, in practice has been consolidated into a unified
Page 19 of 198

Page 20

scheme. All the purchased properties are former council or Development Corporation
properties. 
2.4 The expansions of the Open Market Purchase Scheme have broadened the scope for
acquiring properties across the market. Of the 60 properties purchased in 2024/25, 6
properties were obtained from owner occupiers within blocks of flats / cottage flats
where the rest were already owned by the Council, allowing them to remain in the
properties as Council tenants. Furthermore, 19 properties have been purchased from
Landlords, with their private tenants becoming council tenants. 
2.5 Of the applications received in 2024/25, 16% have been from Landlords, highlighting
their continued interest in the scheme. This is helping prevent homelessness by
enabling tenants of private landlords, who wish to sell their properties to remain in their
homes as council tenants. 
2.6 The properties purchased in 2024/25 can be categorised according to the following
routes: 
Route to Scheme Total Properties
Empty Homes Purchase Scheme (EHPS) 21
Open Market Purchase Scheme (OMPS)  14
OMPS – Last owner in block 6
OMPS – Landlord 19 
2.7 The OMPS has proved a cost-effective way of increasing the councils housing supply
since inception. However there has been a reduction in applications in 2024/25.
Alternative ways to raise awareness and promote the scheme are being implemented
in addition to exploration of further options to expand the scheme. This is necessary to
ensure that acquisition levels projected can be delivered. An advertising campaign is
scheduled for early 2025 to increase application figures, which includes the
dissemination of postcards to public spaces, a promotional video/animation which can
be used across all media platforms and boosted social media posts. Any proposed
expansion of the scheme will be subject to a future report to Committee. 
2.8 Within the first phase of the re-provisioning programme, 6 owners were identified for
acquisition. As at 20/01/25, all 6 owners have now sold their properties to the council,
including the property at 99 Stanhope place, Gowkthrapple, which was subject to
compulsory purchase order.   
2.9 Within the second phase of the re-provisioning programme, 19 properties have been
identified for acquisition. As at 20/01/25, 3 properties have been acquired through the
programme with negotiations continuing with owners of the remaining properties. 
3. Measures of success 
3.1  The acquisition of these properties helps the Council meet its Local Housing Strategy
objectives to increase housing supply to meet identified need; help bring empty
properties back into use, and help improve housing conditions, including energy
efficiency.   
Page 20 of 198

Page 21

4. Supporting documentation 
No appendices 
Pamela Humphries
Chief Officer (Place) 
Page 21 of 198

Page 22

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
A budget of £11.806m based on 100 properties has been allocated in 2024/25 to
fund the purchase and repair of properties through the Open Market Purchase
Scheme which includes a contribution of £3.194m from the Scottish Government. 
As at 6th December 2024, £6,050,658 has been spent on acquisition and repair,
and £3,480,714 has been committed. The average purchase price of the properties
acquired in 2024/25 is £89,178 and average repairs cost is £25,668. 
Funding to acquire properties from owners in the towers/Phase 1/Phase 2 re-
provisioning will be contained within the overall OMPS budget. 
Funding for any proposed extension of the Open Market Purchase Scheme will be
met from the HRA as part of the budget provision for the New Supply Programme. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
Page 22 of 198

Page 23

5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
Risk associated with the New Supply Programme is managed within the council’s
project management and risk register process. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 23 of 198

Page 24

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 24 of 198

Page 25

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    PH/JS Date 12/02/25 
New Supply Programme – Programme Expansion 
From  Pamela Humphries, Chief Officer (Place)  
E-mail stevensonjam@northlan.gov.uk Telephone
James Stevenson
Housing Development
Manager, 07583098631 
Executive Summary
The purpose of this report is to update Committee on a review carried out to identify
opportunities for potential expansion of the New Supply programme and to explore
alternative tenure options to support economic and population growth. 
Recommendations
It is recommended that the Housing Committee: 
(1) Acknowledge the external factors that could affect delivery of the new supply
programme. 
(2) Approve the proposal to increase the new supply target to 6,000 homes by 2035, while
noting the financial implications of increasing the programme and the dependency on
continued Scottish Government grant funding as set out in section 2.3. 
(3) Recognise that acquisitions made through the Open Market Purchase
Scheme(OMPS)  are a crucial component of delivering the new supply target and that
further expansion of the OMPS criteria is being explored. 
(4) Acknowledge the need for mid-market rented homes and the contribution that mid-
market rented homes makes to meeting broader housing needs as well as wider
council objectives. 
(5) Acknowledge that Airdrie has been identified as a potential pilot area to progress
council delivery of mid-market rented homes and that a report will be submitted to
Committee in cycle 3 with details of the proposed pilot. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth
Programme of Work Transforming Places
Item 4
Page 25 of 198

Page 26

1. Background 
1.1 In May 2018, Committee approved proposals to increase the new supply programme
by delivering 5,000 homes by 2035. This was strategically linked to the re-provisioning
of all tower blocks (4,600 flats) over 20 years. It was estimated that around 2,300 new
homes (50%) would be built on the sites of the tower blocks following their demolition.
The target also included an assumption that the council would purchase homes through
the Empty Homes / Open Market Purchase Scheme (OMPS) which was expanded
further in 2023 to include private landlord properties with the aim of protecting
vulnerable tenants at risk of homelessness. 
1.2 In May 2024, the Scottish Government announced a housing national emergency due
to a range of factors including a shortage of affordable housing, rent increases in the
private sector and high interest rates. At the time of writing, thirteen of Scotland’s 32
councils have now declared a housing emergency. There is no standard definition of
what constitutes a housing emergency although common themes such as pressure on
homelessness services, high numbers of households in temporary accommodation and
a lack of affordable homes compared to waiting lists, are known factors. 
1.3  Due to the implementation of mitigating measures, North Lanarkshire Council have not
announced a housing emergency of its own, however pressures remain.
Homelessness has increased in North Lanarkshire over the past two consecutive
years, increasing by 13% and 16% over 2021/22 – 2022/23 and 2022/23 - 2023/24
respectively. This compares to a 9% and 4% increase nationally. This is set within a
context of rising pressure for social rented homes. Analysis of housing demand in North
Lanarkshire indicates increasing pressure over the past three-year period, rising from
just over 3 applicants per social rented allocation in 2021/22 to around 4 applicants in
2023/24.  Further analysis shows that pressure is highly variable in North Lanarkshire,
with pockets of high pressure in Cumbernauld, Viewpark, Coatbridge and Bellshill and
lower than average pressure in other areas, such as Shotts, Wishaw and Kilsyth. This
is set within the backdrop of a wider complex and currently challenging housing
landscape in which wider factors all impact on different parts of the housing market. 
Changes to policy and legislation which impacts on the private rented sector and cost
of living factors are all contributing factors to rising social rented housing pressure and
increasing need for other intermediate tenure housing, as an alternative housing option
to the private rented sector. 
1.4 In August 2024, Committee approved the Strategic Housing Investment Plan (SHIP)
2025/26 -2029/30 which identifies affordable housing priorities that support the delivery
of the Local Housing Strategy. Committee also received an update on the availability
of Affordable Housing Supply Programme (ASHP) grant funding which in 2024/25, had
decreased by £8.03m for North Lanarkshire and £196m (26%) across the 32 local
authorities, when compared to the previous years’ allocation. In September 2024, an
additional £40m was added to the AHSP programme with North Lanarkshire receiving
£673k.  The Scottish Government has announced its intention to restore its affordable
budget to £768m for 2025-26, however, allocation of future AHSP grant funding to
support the council’s programme remains reliant on funding priorities set by the national
parliament. 
1.5 The SHIP sets out a commitment for the council to explore and deliver a broader range
of housing options to diversify housing, create sustainable communities and attract
people to live and work in North Lanarkshire, boosting population and economic growth,
whilst meeting housing needs. 
Page 26 of 198

Page 27

1.6  In November 2024, Committee received an update which outlined that the new supply
programme had achieved 46% towards its overall target of 5,000 homes by 2035 and
approved targets for delivery of the programme up to 2035. The programme has
continued to deliver homes in the intervening period and to date, 1581 new build homes
have been completed, including a record 335 homes in 2023/24, the second highest
number of social rented completions in Scotland. This update also provided a
breakdown of the delivery mechanisms utilised to achieve these figures such as
traditional new build, off the shelf acquisitions and properties purchased via the Open
Market Purchase Scheme, which has facilitated the acquisition of 812 properties to
date. 
1.7 As part of the HRA Budget Motion approved by Council on 19th December 2024, it was
agreed that officers should explore the council’s capacity to increase the new supply
target and submit a report to a future Housing Committee for consideration.   
2. Report 
2.1 As Committee will be aware, the new supply programme is currently one of the largest
new build programmes in the country and performs a critical role in helping the council
achieve not only the strategic outcomes noted in the Local Housing Strategy, but also
key deliverables within the Transforming Places Programme of Work Delivery Plan,
and Economic Regeneration Delivery Plan, to help meet housing need and support 
regeneration of our town centres and communities.   
2.2 As agreed as part of the Budget Motion, officers have undertaken a review of the new
supply programme to identify opportunities to increase the current target of 5,000
homes by 2035, whilst acknowledging the current challenges and risks to programme
delivery. Members will be aware of the challenges currently facing not only the
housebuilding market but the construction industry at national level with high levels of
volatility, particularly in terms of costs, material & labour, and availability of competent
contractors to support delivery of our projects. Through our various procurement
strategies, officers have been able to mitigate many of these factors to ensure positive
performance of the programme to date, however the market remains susceptible to the
impact of global events such as financial downturn, continued conflict abroad and high
inflation rates. 
2.3 Given the positive progress noted in section 1.6 of the report, initial findings from the
financial review have demonstrated that the programme could increase from 5,000
homes to 6,000 homes by 2035. This would be delivered by the range of mechanisms
currently used such as new build, off the shelf purchases and acquisitions from the
open market. It should be noted that this increase is dependent on continuity of grant
funding via the Scottish Government’s Affordable Housing Supply Programme. 
2.4 Its envisaged that as the reprovisioning programme continues, several sites will
become available for new build housing development. A desktop analysis on the
agreed phase 2 sites is in progress to determine the site capacity and the potential for
new homes. A similar exercise will be carried out once the phase 3 sites are identified
and agreed. 
2.5 Rationalisation of both the school and wider estate also present potential opportunities
for new build housing developments and collaborative working between corporate and
housing teams continues. Advantages of converting former school sites to residential
are clear with many located in the heart of the community and have existing
Page 27 of 198

Page 28

infrastructure such as drainage and incoming services in place that can potentially be
utilised. 
2.6 The council’s affordable housing policy continues to present opportunities to purchase
direct from developers in the Cumbernauld sub-market area. Key sites such as the
CGA development are now progressing to site delivery phase, increasing the council’s
stock in these areas and creating multi tenure developments. The council’s Pathfinder
scheme also presents opportunities to purchase properties from other areas within
North Lanarkshire including key regeneration areas such as Ravenscraig. 
2.7 The Local Development Plan - Delivery Programme sets out the available housing land
supply across North Lanarkshire with active sites under construction, unimplemented
sites and sites allocated without permissions in place. Across North Lanarkshire there
are 69 sites, in our land supply, with unimplemented planning permission that could
deliver 8,266 homes. In addition, there are 61 sites allocated for housing with capacity
for 3,455 further homes for which the owner or developer has not sought planning
permission. Early engagement with developers will take place to identify off the shelf
opportunities to supplement our new build delivery programme.   
2.8  The Open Market Purchase Scheme has proved a cost-effective way of increasing the
council’s housing supply since inception. However there has been a reduction in
applications in 2024/25. Alternative ways to raise awareness and promote the scheme
are being implemented in addition to exploration of further options to expand the
scheme. This is necessary to ensure that acquisition levels projected can be delivered
and to help support delivery of council investment programmes, including Energy
Efficiency improvements, by securing full council ownership of flatted blocks. 
2.9 Evidence from Housing Need and Demand Assessments suggests that there is need
and demand for intermediate tenure housing, particularly mid-market rent. Mid-market
rent describes homes where rents are above levels set for social housing but below
average rents achieved on the market.  In Scotland, mid-market rents are typically
linked to the Local Housing Allowance (LHA) for the area. Under current grant
arrangements councils are eligible for £57,281 in subsidy for every new mid-market
rented home, although it is not possible to fund delivery of MMR from the Housing
Revenue Account. Mid-market rented homes are targeted at households in
employment with modest incomes and provide an attractive stable and high-quality
alternative to the private rented sector for households struggling to afford market rents
who would not ordinarily receive high priority on social housing waiting lists. 
2.10 Mid-market rented housing enables councils to meet a broader range of housing need
and aspiration and its provision, particularly in North Lanarkshire’s town centres, will
contribute to a range of strategic housing, regeneration and economic development
objectives. This is recognised in both North Lanarkshire’s Local Housing Strategy
(which identifies delivering mid-market rent as a key strategic action) and the area’s
Economic Regeneration Delivery Plan. They form an important part of the solution in
addressing the housing needs of key workers and increase the range of housing
options available, helping attract and retain new households to North Lanarkshire,
which will stimulate economic growth through increased spending in the local economy,
council tax revenue and the creation of jobs. 
2.11 To date 99 mid-market rented homes have been delivered by Registered Social
Landlords in North Lanarkshire. The council has been exploring the feasibility of direct
delivery and has identified Airdrie town centre as a pilot area to deliver mid-market
rented homes. Work is well underway to develop a business case, including identifying
an appropriate delivery vehicle and funding requirements, working in partnership with
Page 28 of 198

Page 29

the Scottish Government and the Scottish Futures Trust. It is intended that the
proposals for development of a MMR pilot will be subject to a future report to Committee
in cycle 3. 
Financial Considerations 
2.12 The existing target of 5,000 new supply units by 2035 is currently committed and
reflected within the HRA 30-year business model. The programmed work and
associated cost pressures are reviewed annually as part of the HRA Revenue
Estimates and will now be incorporated within the HRA Medium Term Financial Plan to
ensure the costs are included in any Rent Level considerations by members.  The
model has been reviewed to estimate the additional cost to the HRA should the target
be increased to 6,000 within the same timeframe. The costs associated with the
additional 1,000 units will be compared for illustrative purposes against the existing
assumed costs for the 5,000 units over the ten years to the completion target date of
2035/36.     
2.13 The additional costs are dependent on a number of variables, each of which has the 
potential to impact the estimated costs significantly should they differ from what is
assumed.  The following assumptions have been made based on the most up to date
information known at the time of writing: 
• It is understood that that the investment in repairs and the new supply
programme is well received by residents and with little scope for making
financial savings within the HRA other than these areas, it is assumed that
budget shortfalls will be funded through rent increases. This means that the
value of the rent base is assumed to increase year on year, thus reducing the
cost pressure in future years.   
• It is assumed that a maximum of 120 properties will be acquired each year
through the Buy Back programme, attracting capital grant.  The balance will
therefore be made through New Build programmes. 
• The Scottish Government Draft Budget announced the reversal of their
intention to reduce the grant funding available through the Affordable Housing
Supply Programme for 2025/26 only. It is therefore assumed that the New
Build Grant levels will be reduced from 2026/27 onwards. 
• Capital Financed from Current Revenue (CFCR) will continue at the current
level. 
• The profile for acquisition assumes an additional 20 units through buy Back
with the balance from new build properties increasing from 2028/29 onwards. 
• Additional costs associated with the increased number of housing units
including additional repair costs have been factored into the model. 
• The costs associated with each type of acquisition are assumed to be:
Page 29 of 198

Page 30

2.14 Capital Cost 
It is anticipated that the capital cost of acquiring an additional 1,000 units by 2035/36
will be c.£261m and is expected to be funded through a combination of Scottish
Government capital grant and additional borrowing by the HRA.  Due to restricted
annual grant availability, the net borrowing cost will peak in 2035/36 at c.£248m
however additional funds can be claimed retrospectively in later years reducing the total
net borrowing associated with the additional units to c.£171m.   
2.15 Revenue Impact 
Each £1m of borrowing for capital investment results in c.£0.060m of recurring revenue
costs to the HRA the following year. Over the 10 year period of 2027/28 to 2036/37,
additional loan charges of £69.664m are expected to be incurred, however this cost will
largely be offset by additional rental income from the increased number of units
c.£40.740m and further from the recurring impact of rental increases c. £27.140m
(based on the assumption that shortfalls in funding will be met from rent increases
rather than from savings or additional funding). 
In addition, due to the increased stock levels it is anticipated that further revenue costs
will be incurred to ensure the upkeep of the properties through routine repairs.  A further
£5.283m is therefore assumed over the same 10-year period.   
As a result, it is expected that the HRA will have a further budget gap of c.£7.454m
over this ten-year period. 
Should the cost pressures not be met by annual rent increases then one off funding of
£45.032m would be needed for the period 2028/29 to 2040/41.   
2.16 Impact on Tenants
It is assumed that any budget gap for the HRA will be met through increases to rent.
The following provides a comparison of rent increases required and the equivalent
average rent values between the 5,000-unit target and the potential increased target of
6,000 units.  In the initial years, there is a positive impact on the rent increase
requirement due to the profiling of acquisitions i.e. less expensive buy back acquisitions
with annual rental income akin to cost of borrowing.  Once borrowing levels increase
around 2029/30, more significant rent increases are required however in comparison
to the existing 5,000 units this is a minor change.
£000 Buy Backs New Build
Acquisition Cost 114           250       
External Grant 40             104       
Borrowing 74             146       
Annual Loan Charges 4              8           
2024/25 Rental Income 5              6           
Total Repayable 168           335       
Cost Recovery Period (principal) 12 Years 17 Years
Cost Recovery Period (Principal and interest) 22 Years 28 Years
Page 30 of 198

Page 31

2.17 Financial Risk
The proposal would result in a significant increase to borrowing levels which is subject
to potentially volatile interest rates. Acceptance of this risk would be a long-term
commitment over the 40-year repayment period. 
2.18 Debt per property is currently c.£15,935 with the current 5,000-unit target expected to
increase this to £53,886 by 2036/37. The proposed additional 1,000 units would
increase this further to £58,890. As loan charges on borrowing are non-controllable,
this could reduce the Councils ability to respond to changes effectively in the future and
expose tenants to higher costs if variables were to differ from assumptions. 
2.19 Local Housing Allowance (LHA) is the rate used to work out the maximum benefit which
a tenant can claim to assist with housing costs. The financial forecast anticipates
sustained rent increases of on average of 5% per annum. Future LHA uplifts are not
known and therefore there is potential risk that rent charges could exceed the LHA rate. 
2.20 Although not significant from the original target of 5,000 units, the affordability of this
proposal would be dependent on members appetite to impose and sustain rent
increases in excess of 5% per annum. 
2.21 In summary, subject to continued availability Scottish Government funding and future
rent increases, it is estimated that the current programme could be increased to 6,000
homes which will further help meet the needs of our communities and contribute to the
delivery of The Plan for North Lanarkshire. It’s also recognised a diverse tenure mix is
beneficial to the council, particularly in the case of mid-market rent, whereby those on
low and modest incomes can access affordable rented accommodation, whilst
contributing to the wider economy. The proposed MMR pilot project within Airdrie town
centre, although requiring funding from General Services and/or other external sources,
will provide various benefits in identifying areas of potential risk, improvements and
stakeholder engagement, prior to rolling out on a larger scale within our town centres.   
3. Measures of success 
3.1  The measure of success will be the effective delivery of the council’s new supply
programme which aims to increase the councils housing supply.   
Page 31 of 198

Page 32

3.2 The new supply programme will also contribute to the regeneration of town centres
within North Lanarkshire which remains a key priority within the Transforming Places
Programme of Work.   
4. Supporting documentation 
Pamela Humphries
Chief Officer (Place) 
Page 32 of 198

Page 33

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The new supply programme helps support delivery of the seven strategic outcomes
of the local housing strategy whilst meeting the statutory requirements and
contributing to national priorities and targets. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The new supply programme is funded through a combination of prudential
borrowing, capital funding, Scottish Government grant funding and subsidy income.
The affordability of both the new supply and OMPS are reviewed each year and
incorporated into the 30-year Business Plan. Grant funding for new build is
£104,353 per unit, based on a 3-person equivalent as well as additional grant
funding available for additional quality measures and renewables. The OMPS can
secure between £30k-£50k in grant funding per property based on acquisition cost. 
The Affordable Housing Supply Programme (AHSP) budget for 2025/26 has
increased by £768m, however, this is a rise of 2% compared to 2023/24’s budget
of £752m. North Lanarkshire’s allocation for 2025/26 is yet to be announced and
expected at the start of the financial year. The level of funding beyond 2025/26 is
uncertain at this stage and will be subject to national priorities. Financial
implications of reduced future funding is being closely monitored and any potential
impact on the delivery of the council’s programme will be reported to Committee. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Page 33 of 198

Page 34

Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The new supply programme has been considered through the Strategic
Environmental Assessment (SEA) as required by the Environmental Assessment
(Scotland) Act 2005and there are no major issues of relevance identified. 
All new homes are built to the current technical standards or higher. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The new supply programme is promoted via the strategic PR plan with Corporate
Communications with Local Members and other key stakeholders. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Page 34 of 198

Page 35

The councils Risk Management Strategy 2023- 2026 is adopted at both a service
and project level basis for delivery of the new supply programme. This incorporates
risk management governance, structure and methodology which are reviewed at
regular intervals. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 35 of 198

Page 36

Page 36 of 198

Page 37

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    SL/ MK/ AMcG Date 12/02/25 
Local Housing Strategy Annual Progress Report 
From  Stephen Llewellyn, Chief Officer, (Housing)  
E-mail llewellyns@northlan.gov.uk Telephone 07939280680 
Executive Summary 
The purpose of this report is to advise committee of the progress made in delivering the
strategic priorities and actions set out in the Local Housing Strategy 2021-2026. 
The Local Housing Strategy is the main overarching strategy for housing and housing
related services in North Lanarkshire. It is an all-tenure document which sets the strategic
direction in key areas such as homelessness, house condition, housing delivery, specialist
provision, climate change and fuel poverty. The Local Housing Strategy for 2021-2026 was
approved by Committee in November 2021. Local authorities are required to report on
progress annually and to publish this on their website. This is the third annual progress
review since the strategy was approved. 
Recommendations
It is recommended that the Housing Committee: 
(1) Acknowledge the progress made to date in delivering the actions set out in the Local
Housing Strategy 2021-2026. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement  
Item 5
Page 37 of 198

Page 38

1. Background 
1.1 The Housing (Scotland) Act 2001 places a statutory requirement on local authorities to
produce a Local Housing Strategy (LHS) that sets out its strategy, priorities, and plans
for the delivery of housing and related services. 
1.2 Local authorities are expected to review progress annually and to submit a copy of the
review to the Scottish Government More Homes Area Team. The review must also be
made available on the council’s website. 
1.3 North Lanarkshire’s LHS for 2021-26 was approved by Committee in November 2021.
The strategy plays an important part in delivering our ambition, set out in The Plan, to
make North Lanarkshire the place to live, learn, work, invest and visit. It is closely
connected and aligned to other key plans and strategies such as the Local
Development Plan. Town Visions and the Economic Regeneration Delivery Plan. 
2. Report 
2.1 The vision set out in the strategy is: 
“To make North Lanarkshire the place to live, through provision of high-quality housing
and support in sustainable communities, that enables people to thrive and prosper” 
2.2 This vision is underpinned by seven priority outcomes which will be delivered over the
period 2021-2026: 
• We will increase the supply of high-quality sustainable homes across tenure 
• Our communities are vibrant, attractive, and sustainable
• We prevent and resolve homelessness effectively
• We have a range of housing options and supports which promote independence,
health, and wellbeing
• We will tackle climate change and fuel poverty
• Our homes will be fit for the future
• We contribute to improving the quality and accessibility of the private rented sector 
2.3 The Action Plan contains 142 separate milestones, delivering on 41 actions, with the
LHS providing a framework for strategic monitoring and review. Of these milestones,
80 are complete and 48 are on track. 3 milestones have not yet been started and 11
are no longer applicable for various reasons and are included in the Revisions Log at
the end of the Action Plan. No milestones are slightly or significantly behind. 
2.4 A full report on progress under each priority is included in the LHS Annual Progress
Report and corresponding Action Plan (which are attached in the Appendix). Some of
the key progress made to date includes: 
• 460 new affordable homes built in 2023/24 and is our best performance to date
in delivering homes that are energy efficient, accessible and future-proofed for
generations to come.  
• 44 wheelchair liveable homes delivered in 2023/24.
Page 38 of 198

Page 39

• 126 homes purchased through our Open Market Purchase Scheme and reached
a significant milestone with the purchase of our 800th property to date.
• By November 2024, we concluded the purchase of 44 properties from private
landlords with sitting tenants to prevent homelessness as part of the expansion of
the Open Market Purchase Scheme.
• Our Strategic Housing Investment Plan (SHIP) was approved at Committee in
August 2024 and sets out plans to deliver 2,117 new affordable homes in the next
5 years.
• 178 council homes delivered in town centres and edge of town centre locations
since April 2019/20.
• Phase 1 of the re-provisioning programme is nearing completion with 1,246
properties being demolished/in process of being demolished in 2023/24.  
• 181 new homes have been delivered so far within the re-provisioning site at
Dykehead Road and Northburn Avenue, Airdrie.
• Phase 2 of the re-provisioning programme is underway and detailed programme
plans have been developed and will be progressed on a staggered basis.
• The preparation of the North Lanarkshire Development Plan 2 (NLLDP2) is
underway and will set out the policies and proposals for future land use and
development in North Lanarkshire across housing, business and infrastructure.
• 38 long-term empty properties brought back into use in 2023/24.
• Average length of stay in temporary accommodation for homeless cases that
closed was 131 days and is significantly less than the 226 days nationally.  
• Reduction of 15% in proportion of households with children in temporary
accommodation compared with 5% increase nationally.
• 91.1% of new tenancies sustained for more than a year. 
• £18.8m generated in benefits for residents by housing staff.
• Delivering a jointly funded Crisis Response Service with the NLADP providing
assertive outreach to people with complex needs experiencing crisis who require
an immediate response.
• Developed and published our new Temporary Accommodation Strategy (TAS)
setting out the requirements and actions over the 2024 to 2029 period.
• Completed the review of our Housing Support Services and agreed a re-design
of support delivery to ensure a holistic whole family approach.
• Developed a Housing Domestic Abuse Digital Directory which brings together
resources relating to domestic abuse for housing organisations in North
Lanarkshire in one excellent depository.
• From April 2022 to March 2024, 36 tenants moved to a smaller home through the
incentive to downsize scheme.
• 90% of all council new builds (since 2010/11) have improved digital connectivity.
• Published our first Local Heat and Energy Efficiency Strategy in December 2023.
• Over 6,000 energy efficiency measures installed in 2023/24 including external
wall insulation, triple glazed windows, energy-efficient heating and solar panels with
£38m planned investment in 2024/25.
• Delivery of 48 properties with Ground Source Heat Systems in Brandon Street,
Motherwell.
• Secured over £1.9m from the Social Housing Net Zero Heat Fund for works to
upgrade non-traditionally constructed homes.
• Investment of more than £29m to improve the quality of our homes in the past
year, including £13.6m on roof and render, £5.7m on heating upgrades, £3.6 on
renewable energies, £4.7m on kitchens and bathrooms, and £1.6m on home safety
and security.
• Implemented a requirement for private landlords of new and renewal registrations
to provide an Electrical performance Certificate (EPC).
Page 39 of 198

Page 40

• Working in partnership with Mears Housing to promote their acquisition of PRS
properties for the housing of asylum seekers on behalf of the Home Office. 
2.5 The LHS is a five-year plan. Progress will continue to be monitored and reported
annually through the Local Housing Strategy Steering Group and Housing Committee. 
3. Measures of success 
3.1 Delivery of actions set out in the LHS Action Plan (attached in the Appendix). 
4. Supporting documentation 
4.1 Appendix – Local Housing Strategy Annual Progress Report 2023/24. 
Stephen Llewellyn
Chief Officer, (Housing) 
Page 40 of 198

Page 41

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The LHS has a positive impact on several protected characteristic areas, through
the provision of improved housing and related services to meet a broad range of
needs. The EqIA for the LHS was published when LHS was approved. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒  
The LHS contains financial impacts.  As this report is a progress report, it does not
contain any direct financial impacts. 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐
Page 41 of 198

Page 42

If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The LHS has a positive impact on the delivery of digital technology and
connectivity through a series of previously approved projects.  Further detail is set
out in the progress report. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
There are several actions in the LHS that have a positive impact on meeting our
climate change targets. Progress has been made on several key actions relating to
improving energy efficiency of housing stock which reduce our carbon emissions. 
Further detail is set out in the progress report. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Risk is recorded on the Service Risk Register and managed accordingly. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
Page 42 of 198

Page 43

Consultation and engagement with the Armed Forces Community was carried out
as part of the LHS development process.  This has directly informed the actions
and milestones set out in the strategy. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
A CRWIA was completed as part of the development of the LHS and identified
several actions that will impact positively on the rights of children with aims to
improve their health and wellbeing.   
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☒ No ☐ 
Page 43 of 198

Page 44

LOCAL HOUSING STRATEGY 
ANNUAL PROGRESS REPORT 2024
Page 44 of 198

Page 45

2
Local Housing Strategy Annual Progress Report 2024
Contents
Introduction  ....................................................................................... 3
Housing delivery  ................................................................................ 5
Place-making and communities  ........................................................ 8
Preventing and addressing homelessness  ......................................... 13
Specialist provision ............................................................................ 16
	
Fuel	poverty,	energy	efficiency	and	climate	change ............................ 18
House condition  ................................................................................ 22
Private sector housing  ....................................................................... 24
Strategic housing outcomes .............................................................. 26
Page 45 of 198

Page 46

3
Local Housing Strategy Annual Progress Report 2024
Introduction
The Local Housing Strategy (LHS) is the main overarching plan for housing. It sets out our
housing priorities and the actions we will take to achieve our vision:
“To make North Lanarkshire the place to live, through provision of high-quality housing and
support in sustainable communities, that enables people to thrive and prosper”
The strategy plays an important part in delivering
our ambition set out in The Plan to make North
Lanarkshire the place to live, learn, work, invest
and visit, and is closely connected and aligned to
other key plans and strategies such as the Local
Development Plan 2, the Town Visions, and the
Economic Regeneration Delivery Plan.
The strategy will help deliver real improvements to
people’s lives, by:
• Continuing to build much needed new affordable
homes, reducing poverty, boosting the local
economy, and improving outcomes.
• Improving	the	quality	and	energy	efficiency	of	
housing, helping reduce fuel poverty and helping
achieve our net-zero climate change target.
• Delivering a range of support services to help
people achieve their potential, be healthy and
included.
• Helping create sustainable and attractive
communities, through tackling empty homes and
low demand and regenerating areas and places.
North Lanarkshire’s Local Housing Strategy for
2021-26 was approved by Committee in November
2021. This is the third annual report on progress
since the strategy was approved and provides an
update to the previous annual report published
in February 2024, featuring key highlights and
achievements as well as ongoing challenges.
Strategic Context
The Housing (Scotland) Act 2001 places a statutory
requirement on local authorities to prepare a
Local Housing Strategy (LHS) supported by an
assessment of housing need and demand. The
LHS provides the strategic direction, together
with policies and plans to enable the council and
its partners to invest in the delivery of high-quality
affordable housing and housing related services,
across	all	housing	tenures,	to	meet	identified	need.	
There is a requirement to set out the contribution
housing can make towards the effective integration
of health and social care; as well as its approach to
meeting a range of statutory housing responsibilities
such as addressing homelessness and the housing
emergency, improving fuel poverty and house
condition, and working towards the net zero target
for Scotland.   
Page 46 of 198

Page 47

4
Local Housing Strategy Annual Progress Report 2024
Our Priorities
Our LHS has seven priority outcomes which will
be	delivered	over	the	five-year	period	2021-2026.	
These priorities are:
• Priority 1: We Will Increase the Supply of High-
Quality Sustainable Homes Across Tenures
• Priority 2: Our Communities Are Vibrant,
Attractive and Sustainable
• Priority 3: We Prevent and Resolve
Homelessness Effectively
• Priority 4: We Have a Range of Housing Options
and Supports Which Promote Independence,
Health and Wellbeing
• Priority 5: We Will Tackle Climate Change and
Fuel Poverty
• Priority 6: Our Homes Will Be Fit for The Future
• Priority 7: We Contribute to Improving the
Quality and Accessibility of The Private Rented
Sector
Progress on the seven priorities is outlined in this
report highlighting key successes and challenges.
The action plan indicates the status of each action.
Page 47 of 198

Page 48

5
Local Housing Strategy Annual Progress Report 2024
Housing delivery
PRIORITY 1: WE WILL INCREASE THE SUPPLY OF HIGH-QUALITY SUSTAINABLE HOMES ACROSS
TENURES
New Supply Affordable Housing
The number of new homes delivered in North Lanarkshire in the past year has
been	our	best	performance	to	date	in	delivering	homes	that	are	energy	efficient,	
accessible and future-proofed for generations to come. 44 wheelchair homes
have been delivered over the period by the Council and RSL partners and
brings the total number of wheelchair liveable homes delivered to 1781.      
Global,	market/supply	and	inflationary	cost	pressures	continue	to	impact	on	
the delivery of new homes. Despite this we built 230 new affordable council
homes for rent from April to November 2024 and increased the overall supply
of affordable homes to 2,3762	which	confirms	we	are	on	track	to	achieve	the	
target of delivering 5,000 new, affordable rented homes by 2035.
In the last year, we have completed the following new build sites:
Site Name Area Number of Homes Completion Date
Glenacre Drive Airdrie 16 April 2024
Former Orrs Building (Wilson) Airdrie 20 (off the shelf) May 2024
Calder Gardens, Carnbroe (Barratt) Coatbridge 18 (off the shelf) June 2024
Petersburn Road (former primary
school)
Airdrie 40 August 2024
Johnston Road (phase 2) (Bellway) Gartcosh 12 (off the shelf) August 2024
Gartferry Road (phases 1-2)
(Allanwater)
Chryston 12 (off the shelf) September 2024
Dowanfield	Road	(Zoom) Cumbernauld 24 (off the shelf) October 2024
Castlehill Road (further phases) Wishaw 70 November 2024
Gartferry Road (phase 3)
(Allanwater)
Chryston 10 (off the shelf) November 2024
Castlehill Road (Re-provisioning) Wishaw 8 November 2024
1 As at 31 March 20242 As at November 2024 and includes properties purchased through the open market and empty homes purchase schemes.
460 new affordable
homes built
Scottish Government
funding of £25.631m 
secured for 2024/25
44 wheelchair
liveable homes
in 2023/24
SHIP planned delivery
of 2,117 homes over
the	next	five	years
24 MMR homes
delivered in
2023/24
75 homes under
construction
Page 48 of 198

Page 49

6
Local Housing Strategy Annual Progress Report 2024
We are on-site with three other developments, including a town centre site
as well as land linked to our tower re-provisioning programme. We currently
have 75 homes under construction at the sites below, two of which are due to
complete early in 2025 and the third site into 2026. 
Site Name Area
Number of
Homes
Estimated
Completion
Brandon Street Motherwell 48 February 2025
Northburn (shop conversion) Airdrie 1 January 2025
Thorn Road Bellshill 26 February 2026
We	continue	to	incorporate	community	benefits	into	every	council	new	build	
contract, helping to secure work experience, skills development and training
and job opportunities for local residents as well as supporting local businesses
through supply chain improvements. Partnership working with Education,
Early Careers, Virtual Schools, Developing the Young Workforce, Supported
Enterprise, the Apprenticeship team, and Employability services continues to
maximise opportunities created through the new supply programme.
Our RSL partners have delivered 125 affordable homes over the past year,
increasing the total number of new affordable homes built in the year to 4603. 
They have also completed 24 homes for Mid-Market Rent during 2023/24,
bringing the total number of MMR homes to 984 since 2010/11.
Our	Pathfinder	Scheme	is	successfully	enabling	the	council	to	purchase	new	
affordable	homes	directly	from	private	developers	with	five	developments	
concluding in 2023/24. This includes the completion of the former John Orrs
Building	in	Airdrie	with	the	acquisition	of	20	flats.	We	have	also	concluded	the	
purchase of 12 homes at Gartferry Road in Chryston, 18 homes at Calder
Gardens in Coatbridge, 12 homes at Johnston Road in Gartcosh and 24 homes
at	Dowanfield	Road	in	Cumbernauld.		
3 460 new homes includes both council and RSL partners. 4 As at October 2024
Page 49 of 198

Page 50

7
Local Housing Strategy Annual Progress Report 2024
In 2023/24, we brought 126 homes back into use through our Open Market
Purchase	Scheme	(OMPS).	We	also	reached	a	significant	milestone	in	the	
operation of our OMPS when we purchased our 800th property in November
2024 and highlights the ongoing success of the scheme and our commitment
to increasing affordable housing supply whilst also addressing issues associated
with property repair and long-term empty homes.  We have also concluded the
purchase of 445 properties from private landlords with sitting tenants to prevent
homelessness	where	landlords	were	in	financial	difficulties	with	their	lender	and	
property at risk of repossession.   
Our Strategic Housing Investment Programme (SHIP) for 2024/25-2028/29 was
approved by Committee in August 2024 and was submitted to the Scottish
Government in October. The SHIP sets out plans to deliver over 2,117 new
affordable	homes	in	the	next	five	years,	helping	regenerate	local	communities	
and support the economy by creating new jobs.
We are nearing the completion of our research with NHS Lanarkshire and larger
employers within North Lanarkshire to establish gaps and demand for tenures
such as Mid- Market Rent, Shared Equity and Low-Cost Home Ownership. 
This research also includes gathering the views of these key workers to identify
any housing issues they may have encountered. Reports will be produced, and
associated actions will be progressed in partnership with the Growth Team.
The third Glasgow and Clyde
Valley Housing Need and Demand
Analysis was granted ‘Robust and
Credible’ status by the Centre for
Housing Market Analysis in June
2024. This document provides
the supporting evidence for our
ambitious approach to delivering
the quality homes needed across
North Lanarkshire. Glasgow and
Clyde Valley Housing Need and
Demand Assessment
5 As at November 2024
Tenant of 800th property bought via OMPS
Glasgow and the Clyde Valley    
Housing Need and  Demand Assessment
June 2024
Glasgow City Region 
Housing Market Partnership
Page 50 of 198

Page 51

8
Local Housing Strategy Annual Progress Report 2024
Place-making and communities
PRIORITY 2: OUR COMMUNITIES ARE VIBRANT, ATTRACTIVE AND SUSTAINABLE
Our key Town Centre Ambition projects are on track to proceed this year with the previous
publication of Town Action Plans for Airdrie, Motherwell and Wishaw. A further three Town
Action Plans were approved and published after consultation with communities across
Bellshill, Kilsyth and Shotts. These action plans illustrate the developments to take place
over the short, medium and long term to deliver our Town Visions.
The Town Action Plan for Coatbridge will be delivered through the ‘Long Term
Plan for Coatbridge’ to enable access to Levelling Up funding provided by
the UK Government. This plan is being developed through consultation and
engagement with the Coatbridge community.
A Masterplan will be developed for the Cumbernauld area due to the large-
scale regeneration activity set to take place over the next decade. Public and
stakeholder engagement will be completed over the next few years.
In the past year, new affordable homes have been delivered within the town
centre	in	Airdrie	with	the	delivery	of	20	flats	in	the	former	Orrs	Building.														
A	further	24	new	affordable	homes	have	been	delivered	at	Dowanfield	Road	
in	Cumbernauld.	Significant	progress	is	being	made	in	the	construction	at	
Brandon Street, Motherwell and is due to complete in early 2025. This brings
the total of new council homes built in town centres to 178 since April 2019/20
and brings the cumulative total for new council and RSL rented homes in that
period to 836. Since 2010/11, a total of 1,719 social rented homes have now
been delivered in or on the edge of town centres (within a 10-minute walk).
Town Action Plan
Bellshill
Town Action Plan
Kilsyth
Town Action Plan
Shotts
Page 51 of 198

Page 52

9
Local Housing Strategy Annual Progress Report 2024
Despite a challenging funding landscape, particularly around the availability
of external capital funds, and the pausing of key funding programmes such
as the Scottish Government’s Regeneration Capital Grant Fund (RCGF) and
Vacant and Derelict Land Investment Programme (VDLIP), North Lanarkshire
Council	has	continued	to	make	significant	progress	toward	the	regeneration	of	
our town centres. The Centre Cumbernauld was acquired in June 2023 with
£9.225m from the UK Government’s Levelling Up Fund for the regeneration of
Cumbernauld.
We	have	also	received	confirmation,	following	the	recent	UK	Government	
budget, of £19.5m for the Long-Term Plan for Towns (LTPfT) in Coatbridge.
NLC is currently awaiting further details of this fund and supporting guidance to
enable access to these funds. A Town Board has been set up to drive forward
this investment. Feasibility studies have been conducted at Airdrie town centre,
focusing on a heritage led regeneration of the town, thanks to development
funding from Historic Environment Scotland and National Lottery Heritage
Fund. A full funding application will be made for this ‘Rediscovering Airdrie’
project in 2025.
Notable progress is also being made with regard to populating our town
centres via the promotion of town centre living and increasing the availability of
homes for social rent within our town centres.
Progress includes:
Completion	of	20	flats	and	commercial	space	at	the	former	Orrs	department	
store in Airdrie. 
48 homes featuring ground source heat pumps at Brandon Street,
Motherwell due to complete in 2024/25. This includes the conversion of the
former	YMCA	property,	a	Grade	B	listed	building,	into	6	flats	for	social	rent.
Following detailed designs, construction works will commence during
2025/26 at the Grade C listed Old Town Hall in Motherwell to convert the
space to 20 residential units.
Partial demolition of Bank Street, Coatbridge with designs ongoing for
residential development.
Detailed plans underway to re-design the former Municipal Buildings
at	Kildonan	Street,	Coatbridge	into	a	mix	of	residential	and	office	
accommodation.
Demolition	of	the	former	office	building	Kingshouse,	Wishaw	in	2022/23,	with	
designs ongoing for residential development.
Properties at Graham Street in Airdrie delivering commercial and residential
accommodation.	These	are	currently	undergoing	final	defect	works	and	are	
anticipated to be complete by end of 2024.
Detailed plans underway to redevelop an existing gap site at Main Street,
Coatbridge. Final property and land acquisitions are currently ongoing.
Progress has continued during 2023/24 towards our Economic Regeneration
Delivery Plan (ERDP) 2023-2028 which promotes inclusive growth, ensures
community wellbeing and creates a more prosperous place for our residents. 
An ERDP Action Plan has been produced and performance was reported to
Committee in August 2024. 
Page 52 of 198

Page 53

10
Local Housing Strategy Annual Progress Report 2024
In line with our ambitions to develop integrated community hubs
throughout North Lanarkshire, we completed and opened three
community hubs in 2023/24:
Newmains and St Brigid’s Community Hub provides a shared campus for two
primary schools and a family learning centre, delivering an inclusive learning
environment and modern facilities for all members of the community.
Chryston Community Hub which replaces the existing primary school and
provides a new Community Health Clinic, offering residents access to state-
of-the-art health and wellbeing facilities.
Riverbank Community Hub in Coatbridge brings together two primary
schools with an early year’s class and is designed to provide an exciting
and	flexible	learning	environment	which	can	accommodate	a	wide	range	of	
requirements in the years to come.
Alongside this, a further five community hubs are in development this
year:
Orbiston Community Hub in Bellshill is currently under construction.
St Kevin’s Community Hub in Coatbridge and Gartcosh Community Hub in
Northern Corridor are both at pre-construction stage.
St Stephen’s Community Hub in Coatbridge and Chryston High Extension are
at the planning stage.
The	construction	of	these	hubs	provides	local	community	benefit	by	supporting	
local contractors and smaller businesses and enables work placements and
training opportunities to be created. A further two community hubs are in
the evaluation and design phase at Glenboig in the Northern Corridor and
Ravenscraig in Wishaw.
Progress continues to be made on the Ravenscraig Access Road, with the
construction of the rail bridge completed in April 2023. Work is ongoing to
deliver the new connection between Motherwell and Ravenscraig with works
being delivered as a series of work packages to manage cost, programme and
disruption on the road network. The Ravenscraig Access Infrastructure Project
(Dualling of the A723) has been removed from the City Deal Programme and
was approved by the Enterprise and Fair Work Committee in May 24 and by
the Glasgow City Region Cabinet in August 24. 
Page 53 of 198

Page 54

11
Local Housing Strategy Annual Progress Report 2024
1. Demolition Works: 
This is the demolition of
the buildings on the former
Evans Halshaw site and
the former Cook and Indi’s
site. These works are well
underway, with completion
anticipated in January 2025.
Since Glasgow City Region City Deal was signed in
2014,	North	Lanarkshire	has	benefitted	significantly	
from City Deal investment, contributing to the
delivery of key projects including the creation
of MediCity beside the M8, construction of the
Glenboig Link Road and the new transport hub
at Motherwell Train Station. It’s also supporting
construction of the East Airdrie Link Road, access
work to regenerate the Ravenscraig site, and
improving active travel links between communities
and employment areas along the M8. In total, over
£149.8 million of City Deal funding will be invested in
North Lanarkshire.
Phase 1 of the re-provisioning programme is nearing
completion with 1,695 out of 1,750 properties
vacated and includes 200 properties which have
since been re-purposed to support the Ukrainian
Resettlement Programme. 
2. Enabling Works:  
These will comprise utility
service diversions along the
road alignment as well as
ground remediation works
within the Ravenscraig
site to the north of the rail
line. It is anticipated that
these works will commence
Summer/ Autumn 2025.
3. Main Works: These
will be delivered following
the enabling works with
an anticipated start during
2026.
We continue to support Ukrainian families affected
by the war through the provision of accommodation
at towers in Highcoats and Birkshaw. These towers
are contained within Phase 1 of our re-provisioning
programme and were held and then refurbished with
grant funding from the Scottish Government as part
of the resettlement of refugees. 
Ukrainian Tenants at NL Federation conference supported by
Tenant Participation Team
Page 54 of 198

Page 55

12
Local Housing Strategy Annual Progress Report 2024
6 As at 31 March 2024.
In 2023/24, we have demolished or are in the
process of demolishing 1,246 properties across
Phase 1 of the Towers Reprovisioning Programme. 
We are currently on site at Shawhead Low Rise
in Coatbridge, Coursington Towers in Motherwell,
Gowkthrapple low rise in Wishaw and Jackson
Tower in Coatbridge. 
We have now completed 181 homes within the re-
provisioning site at Dykehead Road and Northburn
Avenue in Airdrie. These developments provide
modern	and	energy	efficient	new	build	homes	for	
the local area.   
Phase	2	of	the	re-provisioning	programme	identified	
970 properties for demolition. Detailed programme
plans have been developed and will be progressed
on a staggered basis with an estimated timescale
for completion of at least 5 years.
In the meantime, we continue with our programme
to	invest	in	fire	safety	initiatives	for	tower	properties	
and have installed sprinkler systems in 13 towers. 
Evidence is being gathered in relation to the
identification	of	the	key	aspects	of	achieving	Local	
Living in North Lanarkshire with areas of good
access to physical, digital and social infrastructure
and is in response to National Planning Framework
4 Policy 15. This work is linked with ongoing
development of the Corporate Asset Register
from the strategic asset review and the Open
Space Strategy. Local Living includes the Town
Centre Visions, the Active Travel Strategy, the
creation of Town and Community Hubs as well as
the New Supply Programme and Open Market
Purchase Scheme to increase supply whilst
addressing important issues such as prevention
of homelessness, mixed tenure repairs to improve
housing condition, as well as tackling the blight of
empty homes in communities.
The preparation of the next North Lanarkshire Local
Development Plan 2 (NLLDP2) is underway and is
an important document that will set out the policies
and proposals for future land use and development
in North Lanarkshire across housing, business and
infrastructure. A timetable is underway to prepare
a Development Plan Scheme which will set out the
programme for preparing the NLLDP2 alongside the
stages involved. Evidence has been gathered for
each	policy	topic	area	identified	in	National	Planning	
Framework 4 and the Scottish Government’s local
development planning guidance and a series of
topic papers have been developed that will help
inform our future direction. These Topic Papers are
available on the Consultation Page of the Council’s
website for residents, communities and stakeholders
to inform us of their views and feedback is being
used	to	influence	actions	within	the	NLLDP2.	
North Lanarkshire Local Development Plan 2
(NLLDP2)
A total of 38 long-term empty properties were
brought back into use in the private sector last
year, with a further 42 brought back into use as
social housing through the Empty Homes and
Open Market Purchase Schemes in 2023/24. The
Empty	Homes	Officer	has	been	working	alongside	
colleagues from Building Standards, Environmental
Services and Planning to bring properties back to
habitable condition. In total 282 private sector empty
homes have been brought back into use since
20186.
Page 55 of 198

Page 56

13
Local Housing Strategy Annual Progress Report 2024
Preventing and addressing
homelessness
PRIORITY 3: WE PREVENT AND RESOLVE HOMELESSNESS EFFECTIVELY
(16% increase) compared to the national
increase of 4%
2,226 54 individuals
supported through Homes First with 38
successfully sustaining their tenancy for
over a year
homeless applications
in 2023/24
generated	in	benefits	for	
residents by Housing staff
in	benefits	
generated overall
£18.8m
£47.9m
357 people
who were survivors of domestic abuse
approached housing for assistance in
2023/24
Reduction of 15% in proportion
of households with children in temporary
accommodation compared with a 5%
increase nationally
NLC Lets to homeless
applications has increased from
from 38% to 42.8%
to address the rising number of
homeless households
91.1%
of new tenancies sustained
for more than a year, a
small increase on last year
Average length of stay in temporary
accommodation for cases that
closed was 131 days from 145
days compared with 226 days
Scottish average
Average number of days to close
a homeless case reduced to 154
days from 169 days compared
with Scottish average of 278 days
(below Scottish local authority average) 
Average rent £84.30
Page 56 of 198

Page 57

14
Local Housing Strategy Annual Progress Report 2024
We responded to Scottish Government
consultations on The Housing (Scotland) Bill which
aims to improve the protections and rights of
tenants through the ‘New Deal for Tenants – rented
sector reforms’ and ‘Prevention of Homelessness’. 
This bill was introduced to the Scottish Parliament
in March 2024 and has recently progressed through
Stage 1 of the Bill process. We expect further
consultations from the Scottish Government in
2025	to	help	seek	views	and	influence	the	legislative	
process and wider likely practical impacts that may
need to be addressed.
Our Income Maximisers continue to work in
partnership with the Council’s Tackling Poverty Team
and	Welfare	Rights	to	complete	financial	health	
checks	and	Officers	have	helped	generate	more	
than	£47.9m	in	additional	benefits	for	residents	in	
2023/24	with	£18.8m	of	these	benefits	generated	
by Housing staff. Our Universal Credit Assistance
Fund continues to help tenants who fall into rent
arrears due to built-in waiting times for Universal
Credit payments. 
Our Family Plus Project in partnership with
Barnardo’s Scotland and funded by North
Lanarkshire’s Alcohol and Drugs Partnership
(NLADP) is ongoing and provides housing support
to families and young people affected by domestic
abuse, addictions, and other trauma. Other Rapid
Rehousing Transition Plan (RRTP) partnership
projects that continue to be delivered include the
Youth Life Coach Project, which aims to upskill
young people with the skills and experience they
need to live independently, and Creative Faces
which provides opportunities for therapeutic
interventions to improve health and wellbeing
amongst young people. 
We are strongly committed to providing bespoke
housing options for Care Experienced Young People
(CEYP) to prevent homelessness and housing crisis
or periods of housing insecurity and continue to
work in close partnership with Health and Social
Care to improve pathway planning for CEYP in
North Lanarkshire. Our Youth Housing Champions
continue to provide a key interface between Care
Experienced Young People and housing teams,
enabling earlier transition planning and embedding
new systems and ways of working to ensure that no
Care Experienced Young Person has to present as
homeless to secure accommodation.
Page 57 of 198

Page 58

15
Local Housing Strategy Annual Progress Report 2024
Our RRTP covered the period 2019/20 to 2024/25
and	is	in	its	final	year	of	implementation.	The	
actions contained within the RRTP continue to be
progressed, and the Housing First Team increased
capacity and reach of the Housing First Service in
2023/24. In conjunction with the NLADP, our jointly
funded ‘Out of Hours’ Crisis Response Service
has been operational for a year and provides
assertive outreach to people with complex needs
experiencing crisis who require an immediate
response. The service delivered by Turning Point
Scotland offers psychosocial support, ensuring
individuals are connected to treatment services in
times of crisis, re-engaging people with primary
services to prevent repeat homelessness, prevent
dis-engagement and improve wider life outcomes. 
Our work continues with Blue Triangle Housing
Association through the Breakthrough Service
delivering a test of change through intensive
housing support for people with complex needs and
complements the Homes First service. 
We expanded the use of the Furniture Fund to
include households experiencing homelessness
across all our housing localities. This fund
provided furniture items beyond the provisions
of the Scottish Welfare Fund, enabling homeless
households to foster a stronger sense of belonging.
The Technology Fund was also rolled out across
localities to provide digital devices to homeless
households to improve digital inclusion and access
to online services. 
We have developed a published our new Temporary
Accommodation Strategy (TAS) setting out the
temporary accommodation requirements and
actions over the 2024 to 2029 period. 
We have completed a review of our housing
support services and agreed a re-design of support
delivery to ensure a holistic whole family approach
to supporting people who are or have experienced
homelessness and achieve best value of public
funds. Existing contracts are due to end in July 2025
and the process to re-tender the contracts are now
underway. 
We remain committed to the delivery of tailored
trauma training across the council and wider partner
workforce and have developed a pool of trauma
trainers. To date, 161 housing staff have been
trained in trauma informed approaches.
Crisis Response launch event
Training sessions have been delivered to housing
staff to support the delivery of our approach to
tackling domestic abuse, prevent homelessness
and improve tenancy sustainment through the
provision of timeous access to support, information,
and advice. Alongside this, we have developed a
Housing Domestic Abuse Digital Directory which
brings together all the resources and information
relating to domestic abuse for housing organisations
in North Lanarkshire in one excellent depository. 
This directory is an online resource and features real
live time updates, ensuring information is never out
of date. 
Page 58 of 198

Page 59

16
Local Housing Strategy Annual Progress Report 2024
Specialist provision
PRIORITY 4: WE HAVE A RANGE OF HOUSING OPTIONS AND SUPPORTS WHICH PROMOTE
INDEPENDENCE, HEALTH AND WELLBEING
The council built 34 new wheelchair homes in
2023/24 which is 10% of our annual new build
homes. Overall, 44 new social homes have been
built to wheelchair standard in the last year which
brings the total new build wheelchair homes
delivered by the council and RSL’s to 1787. We
have continued to assess future demand and best
practice across Scotland for wheelchair housing
and ongoing engagement with private developers. 
A	specific	requirement	for	wheelchair	provision	
in the private sector will be set out in the Local
Development Plan 2. 
The council delivered 143 new build homes8 
suitable for older people in 2023/24. We have
established an Older People’s Housing Strategy
Group to consider future options for our linked
corridor retirement complexes. A series of data
papers, including a pressure analysis have been
produced and will inform an options appraisal to
consider scope, investment, improvements and
priorities for older people’s housing and communal
facilities. This will be developed into an Investment
Strategy that enables independence, promotes
health and wellbeing, and provides sustainable,
future-proofed environments. 
Our work to incorporate best practice dementia
design principles continues in all NLC new build
homes with different coloured front doors and solid
colour	flooring	and	worktops	to	assist	with	visibility.		
143 new council homes
suitable for older people
built in 2023/24
Approx 3,900
adaptations
across all tenures
44 new homes built to
wheelchair standard  
(34 NLC/ 10 RSL)
In 2023/24 432 homes built to HfVN standards  NLC 307 /
RSL 125 (total 3,598)
7 at 31 March 20248	This	figure	relates	to	new	build	homes	designated	as	‘amenity’	standard	for	allocation	purposes	only
Page 59 of 198

Page 60

17
Local Housing Strategy Annual Progress Report 2024
As at 31 March 2024, 90% of all council
new builds (since 2010/11) have improved
digital connectivity by incorporating new
smart	technology,	including	fibre	broadband	
and Cat5 cabling, into our homes.
Our partnership with Clyde Valley Housing
Association has enabled the provision of two
resource	flats	in	Airdrie	and	Bellshill	with	the	aim	of	
addressing delayed discharge from hospital and are
invaluable as an additional option for swift move-on.  
The Technology Flat continues to attract visitors
and is a positive step in raising awareness in the
use of technology to aid and support people with
independence, health and wellbeing. In 2023/24,
there were 131 visits from people using the services
and a further 264 visits from staff. We have also now
completed our transition from analogue to digital
alarm services within our sheltered housing.
We have continued the delivery of our Incentive
to Downsize scheme amongst under-occupying
households.	The	scheme	provides	a	financial	
package of assistance to tenants who meet the
under-occupancy criteria enabling them to move,
freeing up larger homes to meet the needs of
families. From April 2022 to March 2024, 36 tenants
moved	to	a	smaller	home	and	qualified	for	the	
incentive payment.
Our partnership in the Pan Lanarkshire Gypsy
Traveller Group continues with a revised action plan
being developed. North Lanarkshire Council housing
is represented on national Gypsy Traveller groups. 
These groups have been in discussions with the
Scottish Government to consider negotiated
stopping for Gypsy Travellers and the Scottish
Government have published a draft report that will
be considered by the strategic group. 
Page 60 of 198

Page 61

18
Local Housing Strategy Annual Progress Report 2024
We	published	our	first	Local	Heat	and	Energy	Efficiency	Strategy	(LHEES)	for	North	
Lanarkshire in December 2023. The document sets out our approach to improving the
energy	efficiency	of	homes	and	buildings	across	North	Lanarkshire,	and	how	we	will	work	
to reduce greenhouse emissions produced from heating buildings. It also aims to reduce
levels	of	fuel	poverty	where	a	lack	of	energy	efficiency	is	a	driver	of	fuel	poverty.	The	LHEES	
is driven by national targets to achieve net zero and reduce fuel poverty. 
Fuel poverty, energy efficiency and
climate change
PRIORITY 5: WE WILL TACKLE CLIMATE CHANGE AND FUEL POVERTY
1,446 council homes
fitted	with	new	
heating systems
85.5% of homes meet
EESSH an increase of
3.4% on last year
100% of council new
builds meet NLC New
Build Sustainability
Standards
Average energy
efficiency	of	our	
new build homes is
currently band B
Page 61 of 198

Page 62

19
Local Housing Strategy Annual Progress Report 2024
We are taking a pro-active approach to space
and water heating in our new build homes, in line
with the Scottish Government’s Heat in Buildings
Strategy. All new homes must now be designed
with non-gas heating systems and is a requirement
in force through Building Standards. We have
successfully delivered Ground Source Heat Systems
at 48 properties in Brandon Street, Motherwell
and intend to monitor energy usage to understand
effectiveness of the heating source. We have also
identified	potential	heat	network	areas	in	North	
Lanarkshire, and these are set out in the LHEES. 
Our development at Dykehead Road, Airdrie has
successfully delivered 19 net zero homes which
feature a number of low carbon technologies
including air-source heat pumps, battery storage,
enhanced solar PV arrays and enhanced insulation.
We are now monitoring energy usage and
performance of these homes to understand energy
costs for tenants, carbon-emissions, help tackle fuel
poverty and help inform future investment decisions. 
We have committed to providing an EV charging
pillar within each parking court of our new
developments, where the National Grid has capacity.
In addition, we aim to install individual charging
points on each new build home that has a private
driveway.
Page 62 of 198

Page 63

20
Local Housing Strategy Annual Progress Report 2024
Minimising heat loss by using
mineral wool insulation and
windows and doors exceeding
requirements set
out in the Building
Standards.
Energy	efficiency	measures	
which see over 99% of our
new build homes achieve a
‘B’	Energy	Efficiency	Rating	
and over 90%
achieve a ‘B’ EPC
CO2 Rating.
Other examples of how we’re building greener
include:
On-site renewable energy.
Photovoltaic provision has
recently been increased and
homes currently being built will
have an in-roof photovoltaic
array which will reduce CO2
emissions, assist with running
costs for the home,
and reduce demand
on the National Grid.
We have a robust investment plan for our homes
and have included the installation of external
wall insulation as part of our render replacement
programme	and	are	fitting	Solar	PV	panels	with	
programmed roof renewals. These actions will
assist	us	in	meeting	net	zero	targets	defined	by	the	
Scottish Government.
Currently 99% of our stock
is EPC Band D
or above, a small
improvement on
last year.
We continued our investment programme in Kilsyth
and Langloan, using funding from the Scottish
Government’s	Energy	Efficient	Scotland:	Area	Based	
Scheme (EES:ABS), to install external wall insulation
to	flatted	blocks.	Overall,	£3.4m	will	be	invested	in	
these areas, with £1m being funded by the Scottish
Government to assist homeowners with the cost of
the works. This investment will not only increase the
energy	efficiency	of	the	properties	but	will	reduce	
carbon emissions and contribute towards meeting
national net zero targets.
During	2023/24,	£1.96m	Social	Housing	Net	Zero	
Heat Fund from the Scottish Government was spent
on upgrading non-traditionally constructed homes
in Wishaw, Motherwell, Newmains, Newarthill and
Airdrie. This investment provides low emission
heating	systems,	utilises	the	fabric	first	approach	
and	improves	energy	efficiency	and	tackles	fuel	
poverty. 
In a collaboration with West Dunbartonshire Council,
we have secured funding from Scottish Enterprise
of £150,000 for 2024/25 to procure innovative new
solutions	on	renewable	heating	options	for	flats.
We have invested £2m in
privately owned homes in
North Lanarkshire through
the	Energy	Efficient	
Scotland Area Based
Scheme (EES:ABS).  
Page 63 of 198

Page 64

21
Local Housing Strategy Annual Progress Report 2024
Over 6,000 energy
efficiency	measures	
installed in 2023/24
External wall
insulation
462
Triple-glazed
windows
601
Energy-efficient	
heating
2,307
Solar panels 
1,904
Insulation
upgrades
689
Roof
upgrades
414
planned investment
in	energy	efficiency	
measures in 2024/25
£38m
We have continued our collaboration with the Wise
Group to deliver the North Lanarkshire Energy
Advice and Assistance Service through our HEAT
(Home Energy Advice Team) mentors. The service
helps households experiencing an energy crisis
by providing independent, tailored advice and
advocacy services to ensure no one has to choose
between heating their home and eating. By working
with households to optimise their relationship with
fuel	consumption	and	efficiency,	we	aim	to	reduce	
fuel poverty and help more people live comfortably
in a warm home. 
We continue to use the Home Energy Scotland
(HES) Referral Portal which allows us to make
referrals directly to Home Energy Scotland who can
then provide households with expert advice on how
to save energy, access government-funded energy
schemes and reduce fuel bills
Page 64 of 198

Page 65

22
Local Housing Strategy Annual Progress Report 2024
House condition
PRIORITY 6: OUR HOMES WILL BE FIT FOR THE FUTURE
We have invested more than £29.2m to improve
the quality of our homes over the past year,
including £13.6m on roof and render, £5.7m on
heating upgrades, £4.7m on replacing kitchens
and bathrooms, £1.6m on home security such
as controlled entry doors and CCTV, and £3.6m
on renewables such as PV solar panels and air
source heat pumps. Despite a variety of ongoing
challenges, including labour/ material shortages and
cost increases, we still plan to invest over £74m in
the coming year.
We are mindful of rising energy prices and the
UK government decision to limit the Winter Fuel
Payment	to	only	those	on	qualifying	benefits.	As	
a result, we are installing heating systems which
modulate heating usage when not required helping
tenants save money on heating bills. Our investment
in renewables has continued with the installation
of solar PV panels that enable households to use
electricity produced by the panels for free and only
paying for any additional electricity required. Any
excess electricity not used by the household can be
sold back to the National Grid. We have plans for a
programme of increased solar PV panel installations
to over 1,000 properties in 2024/25. 
669 homes with
PV solar panels
Emergency repairs
completed within
2.77 hours on average
423
new
kitchens
421 new
bathrooms
1,446
new heating
systems
641
roof and render
improvements
0 failures to meet gas
safety regulations
Page 65 of 198

Page 66

23
Local Housing Strategy Annual Progress Report 2024
Electrical rewiring
of houses and
common areas of
low-rise blocks of
flats	
Roof and render
upgrades
External wall
insulation
Windows,
kitchens
and
bathrooms
Lift replacements
Lead water pipe
replacements
We continue to invest in our tower blocks to ensure
they are safe, secure and attractive places to live.
We have completed re-cladding in four towers in
Coatbridge and a further two towers are in the
design stage involving specialist consultants.
The programme to install sprinkler systems within
individual properties is also progressing well. New
sprinkler systems have been installed in three
tower blocks in Motherwell at Burnside, Lodge and
Doonside and we are currently progressing with
Phase 2 of the sprinkler installation programme
at Glassford, Woodside, Glen, Coltswood and
Redbridge towers, despite issues of tenant non-
access, and material and labour shortages.
The average time to re-let homes increased by
2.7 days to 35 days during the year, mainly due
to material shortages, and issues with recruitment
and workforce retention being experienced by our
contractors. However, we performed well when
compared to the Scottish average of 56.7 days
and the Scottish local authority average of 72.6
days. Our housing and repairs teams are working
together and liaising closely with our contractors
to continually improve these timescales with a view
to bringing our performance back to pre-pandemic
timescales.
Our work to lead the large-scale re-provisioning
of	privately	owned	flats	at	Millcroft	Road	in	
Cumbernauld continues. There have been 19
voluntary acquisitions completed which allows
residents to move to Sanctuary’s development at
Burns Road. Compulsory Purchase Orders (CPO’s)
have been submitted to the Scottish Government
for the remaining properties and the hearing process
has now concluded with a decision expected early
in 2025. Planning for the replacement new build
development has also been approved.
New build flats by Sanctuary at Burns Road
Page 66 of 198

Page 67

24
Local Housing Strategy Annual Progress Report 2024
Private sector housing
PRIORITY 7: WE CONTRIBUTE TO IMPROVING THE QUALITY AND ACCESSIBILITY OF THE
PRIVATE RENTED SECTOR
Alongside the completed review and redesign of our
Landlord Registration processes and procedures, we
have implemented a requirement for landlords of new
registrations and renewal applications to provide an
Electrical	Performance	Certificate	(EPC)	for	their	properties.		
A revised audit process has also been implemented with
over 90 visits completed year to date to ensure PRS
properties meet the required legal standards.    
Rise in
Registered
Landlords
from 8,604
to 8,662 in
2023/24. 
Conversely, a reduction in
number of PRS Approved
properties down from
13,155 to 12,924.
Annual Private Landlord
Forum held in April 2024.   
Autumn 2024 edition of
Private Landlord Newsletter
has been viewed over 1,000
times.
We have developed a recording process to ensure
accurate information is held on PRS properties
around the repairing and tolerable standards, below
tolerable standard and nuisance.
We held our third annual private landlord forum
event in April 2024 with good engagement from
landlords. The forum is supplemented with a
newsletter and our most recent autumn newsletter
has been viewed over 1,000 times. We remain
committed to working with landlords to improve the
sector and continue to seek landlords who may be
interested in joining a PRS working group. 
Page 67 of 198

Page 68

25
Local Housing Strategy Annual Progress Report 2024
We are working in partnership with Mears Housing
to promote their acquisition of PRS properties for
the housing of asylum seekers on behalf of the
home	office.	This	scheme	enables	PRS	landlords	
to lease their properties to Mears for a period of
up to 5 years, with rent guaranteed and regular
property visits and lettings and management service
included. This is a business model which can
provide	longevity,	financial	protection	and	provide	
a secure home for very vulnerable people in our
society. 
Our	Private	Sector	Officers	continue	to	carry	
out inspections in support of the Ukrainian Re-
settlement Programme, although numbers have
fallen, ensuring the properties of those applying to
the	Programme	were	of	a	suitable	standard	and	fit	
to house individuals from Ukraine.
Our management and registration of short-term lets
such as B&B’s and guesthouses continues with a
further 50 applications in 2024, taking the overall
number of short-term lets applications to 193 since
the legal requirement began in October 2023.
Page 68 of 198

Page 69

26
Local Housing Strategy Annual Progress Report 2024
Strategic Housing Outcome 1: We increase the supply of high-quality sustainable homes across tenures
Action Baseline
2019/20
Milestone Target Lead
Service
Timescale Status Progress 2023/24
KEY ACTION 1.1
Deliver alternative tenure housing
to meet a broad range of needs and
deliver sustainable, inclusive and
diverse communities
38 mid-market
homes delivered
to date
Enable RSLs to deliver Mid Market Homes in large council
developments to provide more mixed tenure, sustainable and
diverse communities and support town visions and regeneration
projects
Deliver Mid Market
Homes
NS Ongoing On Track 98 MMR homes delivered since 2010/11 (at 31 March 24).
Initial feasibility
report
Re-visit initial feasibility studies to determine viability of council
delivery of MMR
Re-freshed feasibility
study
BDS/NS 2023 Complete Council MMR delivery options and financial modelling re-
visited. Airdrie identified as a potential pilot area for MMR
delivery.
Establish a Housing Delivery Partnership to deliver MMR and
other alternative tenure to ensure readiness should market
conditions allow for council delivery of alternative tenure
Action removed - refer to revisions table
Establish HDP NS/BDS 2022 Not
applicable
MMR delivery options re-visited. MMR potential pilot site
identified.  Note amendment of action as establishment of
HDP in advance of market conditions not required - as MMR
delivery planned.
Initial feasibility
report
Explore use of Affordable Housing Policy to deliver shared equity
housing
Complete options report BDS/NS 2022 Complete Guidance published and includes delivery of shared equity
housing.
Initial discussions
held
Explore Build to Rent feasibility Build to Rent explored NS/BDS Ongoing Complete BTR encouraged. To date no interest from BTR developers/
investors.
- Carry out engagement and analysis with key workers and
employers to identify further the future housing needs of key
workers
Engagement and Analysis
complete
BDS 2023 Complete Survey of key worker employees, Biocity and NHS employer
survey complete.
- Develop a self-build register to be published on the council’s
website
Self-build register
developed and published
BDS/Pl 2022 Complete Self build register published on NLC website.
- Consider ways in which planning policy and use of public land
can support delivery of self-build
Methods considered BDS/Pl 2022 Complete NPF4 incorporates Planning Policy on self-build. The
development of LDP2 will set out support mechanisms for
self-build in North Lanarkshire.
KEY ACTION 1.2
Improve our strategic understanding
of Covid-19 on housing need and
aspirations
- Undertake further analysis of housing needs and aspirations as
further evidence and data emerges
Analysis complete BDS Ongoing Complete Research complete on impact of Covid-19 on housing needs
and aspirations. 
Page 69 of 198

Page 70

27
Local Housing Strategy Annual Progress Report 2024
Strategic Housing Outcome 1: We increase the supply of high-quality sustainable homes across tenures
Action Baseline 2019/20 Milestone Target Lead
Service
Timescale Status Progress 2023/24
KEY ACTION 1.3
Contribute to the strategic planning
for housing in Glasgow and Clyde
Valley
HNDA2 Contribute to Housing Need and Demand
Assessment 3
Completion of HNDA3 BDS 2021/22 Complete HNDA3 submitted to the Centre for Housing Market Analysis. Recommendations
received and HNDA3 is currently in the process of being updated 
HLR 2021 (under
consultation)
Land available for private sector Housing
Supply Target (HST)
759 units per annum
(based on HNDA2 to be
updated to reflect HNDA3)
Pl 2026 On Track From February 2023, the requirement is 735 units per annum All-Tenure (MATHLR). 
Draft 2024 Housing Land Audit records 688 private units were completed for the HLA
period 1/04/23 to 31/03/24.
HLR 2021 (under
consultation)
Land available for social rented/below
market rent sector HST
300 units per annum
(based on HNDA2 to be
updated to reflect HNDA3)
Pl 2026 On Track From February 2023, the requirement is 735 units per annum All-Tenure (MATHLR). 
Draft 2024 Housing Land Audit records 483 social rent units were completed for the
HLA period 1/04/23 to 31/03/24
HLR 2021 (under
consultation)
Land available for all tenure HST 1,059 units
(based on HNDA2 to be
updated to reflect HNDA3)
Pl 2026 On Track From February 2023, the requirement is 735 units per annum All-Tenure (MATHLR). 
Draft 2024 Housing Land Audit records 1,171 All-Tenure units were completed for the
HLA period 1/04/23 to 31/03/24.
KEY ACTION 1.4
Maximise provision of affordable
homes, to meet a range of housing
needs
SHIP 2021/22 –
2025/26
Review and update the Strategic Housing
Investment Plan (SHIP) annually
SHIP updated annually NS/BDS Annually Complete Produced annually.
2,024 council and
RSL units delivered
since 2010
Deliver Affordable Housing Supply Target
identified in HNDA3
300 units per annum
but subject to change
following progression of
HNDA3
NS 2026 On Track 3,795 council and RSL units delivered since 2010/11 (at 31 March 24)
- Identify mismatch of supply and demand
in social rented housing to inform
investment priorities (linked to the
council’s asset management plan)
Analysis undertaken BDS 2026 On Track Pressure analysis undertaken annually which informs investment priorities.
KEY ACTION 1.5
Evaluate the impact of the Affordable
Housing Policy to further understand
impact
- Undertake evaluation of the Affordable
Housing Policy
Evaluation complete BDS/NS 2023 Complete Revised Affordable Housing Policy approved at Planning Committee in 2023
Page 70 of 198

Page 71

28
Local Housing Strategy Annual Progress Report 2024
Strategic Housing Outcome 2: Our communities are vibrant, attractive and sustainable
Action Baseline 2019/20 Milestone Target Lead
Service
Timescale Status Progress 2023/24
KEY ACTION 2.1
Help re-shape and
populate our town centres
Town visions developed and
engagement ongoing
Identify and deliver transformative town centre
projects to provide new residential provision
• Kildonan St, Coatbridge
• Bank St, Airdrie
• Motherwell Town Hall
• Former Tesco Site, Wishaw
• Broomknoll St, Airdrie
• John Orrs Building, Southbridge St, Airdrie
Complete projects NS 2026 On Track The former Orrs building at South Bridge Street, Airdrie progressed during 2023/24 and
completed in 2024/25, delivering 20 new homes for social rent in Airdrie town centre.
Works also progressed significantly at Brandon Street, Motherwell which is also due to
complete during 2024/25.
Engagement on town hubs
commenced
Develop town centre and community hubs to
support the delivery of public services and
provide flexible space
Complete hubs GT 2026 On Track Community Hub progress:
Newmains/St Brigid’s Community Hub, Wishaw opened Q1 2023.
Chryston C Hub (Northern Corridor) and Riverbank C Hub (Coatbridge) opened in October
and August 2023 respectively.
Orbiston C Hub (Bellshill) is currently under construction,
St Kevin’s C Hub (Coatbridge, and Gartcosh C Hub (North Corridor) are both at pre-
construction stage.
St Stephen’s C Hub (Coatbridge) and Chryston High Extension (Northern Corridor) are at
planning stage.
Projects in Glenboig (Northern Corridor) and Ravenscraig (Motherwell) are being
evaluated.
Page 71 of 198

Page 72

29
Local Housing Strategy Annual Progress Report 2024
Strategic Housing Outcome 2: Our communities are vibrant, attractive and sustainable
Action Baseline 2019/20 Milestone Target Lead
Service
Timescale Status Progress 2023/24
KEY ACTION 2.2
Improve connectivity of
our communities through
investing in physical, social
and digital infrastructure
Progress made on
Ravenscraig Access Road
- Ravenscraig South and
North
Deliver the City Deal Programme Projects complete GT 2026 On Track Progress continues to be made on the Ravenscraig Access Road, with the construction
of the rail bridge completed in April 2023. Work is ongoing to deliver the new connection
between Motherwell and Ravenscraig with works being delivered as a series of
packages to manage cost, programme and disruption on the road network.
Connecting NL – a
Blueprint Project
Deliver new opportunities for active and
sustainable travel
New opportunities
identified
GT 2026 On Track  Alexander Street, Meadowhead Road, Petersburn Road / Brownsburn Road, A73
Craigneuk Park, Newhouse to Salsburgh, and Glasgow Road, Phase 1: works completed.
Riverbank and Newmains community hubs: Active travel routes supporting final 400m
into sites completed.
Implement fast, affordable digital connectivity
for businesses and communities
Improved digital
connectivity
BS 2026 On Track 320km of ultra fast full fibre digital network cabling is complete connecting 342 wide
area networks to 307 council sites. WiFi service is being improved to provide availability
at more council locations - retirement complexes, hubs, schools, and other public facing
buildings.
Fibre to the Premise and
Cat5e ethernet cabling
provided in council new
build homes
Continue to deliver digital connectivity within
new build council homes
All council new build
homes delivered
will have digital
infrastructure
NS Ongoing On Track 90% of all council new build homes since 2010/11 are digitally enabled (at 31 March
24).
KEY ACTION 2.3
Improve economic
opportunities and
outcomes for all
Economic Regeneration
Plan approved
Progress actions contained within North
Lanarkshire’s Economic Regeneration Plan
(2019-23)
Actions complete NS/GT/
BDS
2023 Complete Refreshed & Updated ERDP published in 2023. Progress continued towards ERDP
2023-2028 recommendations. An ERDP Action Plan was produced for 2023/24 and
performance against this was reported to Enterprise and Fair Work Committee August
2024.
KEY ACTION 2.4
Develop and deliver the
Tower Re-provisioning
Programme
3 tower blocks demolished
(Cheviot, Merrick and
Pentland Court)
Deliver Phase One comprising 1,760
demolitions with sites cleared for future
investment
1,760 demolitions HP/NS 2026 On Track Demolition of Coursington, Allan and Draffen Towers (Motherwell), Shawhead flats
(Coatbridge), Jackson (Coatbridge) and Gowkthrapple low rise blocks (Wishaw) in
progress. New programme dates will be required for High Coats, Dunbeth and Birkshaw
due to the Ukrainian Resettlement Scheme.
Phase Two developed for implementation
from 2025
Programme developed HP/NS 2024 On Track Blocks for demolition in Phase 2 approved. Programme prepared and agreed across the
Housing service.
KEY ACTION 2.5
Invest in council multi-
storey towers to ensure
continued safety and
security of tenants
Programme underway Continue to review and implement where
appropriate fire stopping and prevention
measures and re-cladding in multi-storey
towers
Works complete HP 2026 On Track 13 tower blocks have had sprinkler systems completed.
Page 72 of 198

Page 73

30
Local Housing Strategy Annual Progress Report 2024
Strategic Housing Outcome 2: Our communities are vibrant, attractive and sustainable
Action Baseline 2019/20 Milestone Target Lead
Service
Timescale Status Progress 2023/24
KEY ACTION 2.6
Implement the Place-
Standard Tool across a
wider range of settings
Place-Standard Tool in use Incorporate use of the Place-Standard
Tool in tenant participation settings
to identify areas of improvement and
improve place
Place-Standard Tool
in use across tenant
participation groups
BDS 2023 Complete Place Standard Tool has been introduced into Tenant Participation activity and is incorporated
where appropriate.
Implement use of the Place-Standard
Tool in existing and future housing
consultation and involvement
opportunities i.e. tenants conference,
housing forums etc.
Place-Standard Tool
used across the
range of housing
consultation activities
BDS 2024 Complete Use of Place Standard Tool is incorporated into consultation activities where appropriate.
KEY ACTION 2.7
Incorporate the twenty-
minute neighbourhood into
community development
Further implement high-quality 20
minute neighbourhoods in North
Lanarkshire focussed on provision
of physical, digital and social
infrastructure and mapping and
review of provision
High-quality 20 minute
neighbourhoods
implemented
BDS 2026 On Track Evidence is being gathered in relation to the identification of the key aspects of Local Living
in North Lanarkshire. This work is linked with ongoing development of the Corporate Asset
Register being developed out of the strategic asset review and the Open Space Strategy.
KEY ACTION 2.8
Increase the number of
empty homes brought back
into use
197 empty homes
purchased since scheme
established
Continue to deliver the Empty Homes
Purchase Scheme
30 per annum NS 2026 On Track The Empty Homes & Open Market Purchase Schemes have now been combined. However 385
empty homes have been purchased since scheme established (as at Aug 2024)
138 empty homes brought
back into use via the
empty homes officer since
2018-19
Continue to work with owners and
partners to bring empty homes back
into use
35 per annum PS 2026 On Track 282 private sector empty homes brought back into use since 2018
KEY ACTION 2.9
Tackle low demand within
council stock
Low Demand Analysis
complete 2019/20
Update Low Demand Analysis and
action plan annually
Complete analysis BDS Ongoing Complete Incorporated as part of a new summary report which accompanies the pressure analysis.
Identify options to address low
demand stock
Options identified BDS Ongoing Complete Phase 2 re-provisioning underway.
Page 73 of 198

Page 74

31
Local Housing Strategy Annual Progress Report 2024
Strategic Housing Outcome 3: We prevent and resolve homelessness effectively
Action Baseline 2019/20 Milestone Target Lead
Service
Timescale Status Progress 2023/24
KEY ACTION 3.1
Implement the RRTP
Homes First model
developed
Develop and implement Homes
First service
Homes First Service
implemented
HS/
H&SC/
BDS
2025 Complete Homes First service being delivered and upscaled in 23/24. Supporting 54 individuals.  38 have
sustained their tenancy for over a year.
Forever Homes project
established
Carry out evaluation of ‘Forever
Homes’ project
Evaluation complete HS/BDS 2023 Complete Individuals transferred over to Homes First project
Protocols in place Review shared protocols for young
care experienced people and
domestic abuse
Protocols reviewed HS/BDS/
H&SC
2022 Complete CEYP protocol reviewed and revised in partnership with Health and Social Care. Domestic Abuse
Protocol updated and new Housing Domestic Abuse Policy developed and implemented.
105 homeless people
discharged from prison
Implement SHORE standards SHORE standards
implemented
BDS/HS/
H&SC
2023 Complete Process developed in 2022/23 between PP Team and Operational Housing to support needs of SHORE.
No request made to develop protocol working within Shore Standards.
- Explore viability of specific services
to support women with poor
mental health and addictions
Services explored BDS/
H&SC
2024 Complete We continue to deliver the Family Plus Project in partnership with Barnardo’s Scotland, funded by North
Lanarkshire’s Alcohol and Drugs Partnership (NLADP), which provides housing support to families and
young people affected by domestic abuse, addictions and other trauma.
Discussions underway
with RSL partners
Agree and monitor target lets for
RSLs to homeless households
Targets agreed and
monitoring system
in place
BDS/HS/
RSLs
2022 Complete We have asked CHR RSL partners to increase their lets to homeless, in 2023-2024 only 14.5% of
all lets made by the RSL partners were to homeless households (73 of 503). However in addition
to the lets to homeless the RSL partners made 60.2% of all lets (303 of 503) to applicants who
were at risk of homelessness but not yet on the statutory homeless list, these are considered to be
homeless prevention lets and include applicants subject to Domestic Abuse, those at risk of losing their
accommodation and those who are subject to a joint protocol with another service such as hospital
discharge, care leavers, foster carers etc.
Page 74 of 198

Page 75

32
Local Housing Strategy Annual Progress Report 2024
Strategic Housing Outcome 3: We prevent and resolve homelessness effectively
Action Baseline 2019/20 Milestone Target Lead
Service
Timescale Status Progress 2023/24
KEY ACTION 3.2
Review housing options
and prevention activity
S11 procedure in
place
Review S11 process and
procedures
S11 process and
procedures reviewed
BDS 2023 Complete Further Increase in S11 notifications received in 2023/24 - was expected due to ongoing cost of living crisis and post
covid legislation ending which is speeding up court processes etc.
Development of
Housing Options
Toolkit underway
Deliver the Housing
Options Training Toolkit
Housing Options
Training Toolkit
operational
BDS 2022 Complete The management and future development of the Housing Options Training Toolkit has now been transferred to the
Scottish Housing Network. All modules are live and will be subject to annual review or as legislation or best practice
changes. NLC remain as a lead partner on the Steering Group.
Number of PAS
interviews leading
to homeless
applications –
65.4%
Embed new approaches
and good practice for
prevention activity
Improved practice BDS/HS 2024 Complete Training completed in all housing localities to promote more effective use of PAS and raise awareness of requirements
in this respect. Sustainability project ongoing.
KEY ACTION 3.3
Improve housing support
and accommodation
services meet the needs
of homeless households
Housing support
services
commissioned
Re-design of housing
support services to meet
needs and align with
RRTP
Re-design and
re-tender housing
support services
BDS 2024 On Track Support review and options appraisal concluded.  Re-design of housing support services approved at Housing
Committee in November 2024. Re-tendering process to begin in early 2025
Review commenced Carry out temporary
accommodation review
Review complete BDS 2023 Complete Temporary Accommodation Strategy produced and published.
KEY ACTION 3.4
Collaborate with the
Alcohol and Drug
Partnership and RRTP
partners to deliver
services to people
affected by substance
misuse
Some staff trained
in trauma informed
approaches
Roll out workforce
development programme
for trauma informed
approaches
Trauma informed
approach embedded
in practice
BDS 2025 On Track TNA’s completed and staff have started to complete the level of training assigned to their job role. Transforming
Connections training pilot for skilled level housing staff is currently underway.
Explore options to
develop additional
services for homeless
households with
addictions
Options explored BDS/
ADP
2024 Complete Crisis response service fully operational.
Page 75 of 198

Page 76

33
Local Housing Strategy Annual Progress Report 2024
Strategic Housing Outcome 4: There are a range of housing options and supports which promote independence, health and wellbeing
Action Baseline 2019/20 Milestone Target Lead
Services
Timescale Status Progress 2023/24
KEY ACTION 4.1
Increase the supply of
affordable wheelchair
housing.
43 new build
council wheelchair
homes built
Deliver wheelchair housing on all council new
developments where feasible (where not feasible
provision should be increased on other sites to
achieve minimum target)
10% NS 2026 On Track 104 new build council wheelchair homes delivered since 2010/11 (at 31 March 24).
32 new build RSL
wheelchair homes
built
Deliver wheelchair housing on all RSL new build
developments where feasible (where not feasible
provision should be increased on other sites to
achieve minimum target)
5% RSLs 2026 On Track 74 new build RSL wheelchair homes delivered since 2010/11 (at 31 March 24).
Carry out review/ cost analysis of council new
build amenity bungalows to determine scope for
increasing standard to full wheelchair liveable
standard
Review complete NS 2022 Complete Cost comparison complete in 2022. Estimated £20-25k increase per unit.
KEY ACTION 4.2
Increase the supply of
wheelchair housing in
the private sector
- Engage and work with private developers to
increase awareness of the need for wheelchair
accessible and liveable housing and encourage
development
*target to be
determined following
engagement with
developers
BDS 2022 Complete Requirement for wheelchair provision in the private sector will be set out in LDP2
2022 Complete Mechanism to monitor the delivery of wheelchair housing in the private sector will be
incorporated with LDP2.
KEY ACTION 4.3
Increase the supply
of adaptable and
accessible housing
640 council new
build social rented
(HfVN) homes
(2019); 1,384 RSL
social rented (HfVN)
homes built (2019)
Deliver housing for varying needs through the
council and RSL new build programme
5,000 by 2035 NS/RSLs 2026 On Track 3,598 council and RSL new build homes meeting HfVN standards since 2010/11 to date (at
31 March 24).
3,463 adaptations
completed in
2019/20
Provide equipment and adaptations across tenure Increase H&SC 2026 On Track Approx 3,900 adaptations completed across all tenures, however data to be treated with
caution. Equipment and Adaptations Service have developed a new recording system for all
tenure adaptations fitted and it is no longer possible to report the cumulative figure.
Carry out analysis to identify future demand for
equipment and adaptations in partnership with
health and social care
Analysis complete
and needs identified
BDS/
H&SC
2024 Complete Adaptation and equipment information gathered annually and reviewed for any patterns in
trends. Further analysis of wet floor showers removed undertaken in 2024.
Page 76 of 198

Page 77

34
Local Housing Strategy Annual Progress Report 2024
Strategic Housing Outcome 4: There are a range of housing options and supports which promote independence, health and wellbeing
Action Baseline 2019/20 Milestone Target Lead
Service
Timescale Status Progress 2023/24
KEY ACTION 4.4
Increase the supply of
older people’s housing
2,501 older people
homes (NLC and
RSL)
Deliver amenity housing in council new build
developments
Increase NS 2026 On Track Continuing to deliver homes suitable for older people on NLC new build developments, where
need is demonstrated
2,501 older people
homes (NLC and
RSL)
Deliver amenity housing in RSL new build
developments
Increase NS 2026 On Track Discussion ongoing with New Supply Team around potential opportunities to identify and collate
RSL amenity housing as this information is not collected.    
Initial feasibility
exercise underway
Explore feasibility of delivering shared equity
for older people linked to the Affordable
Housing Policy
Feasibility exercise
complete and
recommendations made
BDS/NS 2022 Complete Guidance was published in 2023 and includes delivery of Shared Equity Housing.
KEY ACTION 4.5
Improve the suitability
of existing housing to
meet the needs of older
people
Tender approved Complete the re-modelling/ refurbishment of
Dundyvan Gardens linked corridor retirement
complex
Remodelling complete HP 2022 Complete Remodelling of Dundyvan Gardens complete.
Initial options
appraisal complete
Carry out options appraisal for remaining
linked corridor retirement complexes
Options appraisal
complete
BDS/HP 2024 Complete Older people’s housing strategy group established and first in a series of data papers produced to
inform options/prioritise remaining linked corridor complexes
- Develop investment strategy for linked
corridor retirement complexes to improve
long-term sustainability
Investment strategy
complete
BDS/HP 2025 Complete Older people’s housing strategy group established and bespoke pressure analysis carried out for
linked corridor complexes to inform investment decisions.
- Identify new fire safety and prevention
measures for implementation in retirement
housing linked to the new Fire Safety
Guidance for Specialist Housing
Fire prevention and
safety measures
identified and
implemented
HP 2026 On Track Procurement of contractor complete and prioritised programme in development.
- Implement downsizing incentives and
support to help older people down-size to
more suitable housing
Allocation policy
revised and downsizing
incentive scheme
implemented
HS 2022 Complete Allocation Policy revised and Incentive to Downsize Scheme implemented.
- Carry out evaluation of impact of re-
classification of sheltered housing in
meeting needs
Evaluation complete BDS 2024 On Track Further changes made to the designation of complexes. There are no longer sheltered plus
complexes, only retirement and amenity. Allocation policy adjusted accordingly and paper in
development showing need and demand for older people’s housing.
- Carry out review of RSL housing support
for sheltered housing and very sheltered
housing
Review complete H&SC 2025
(timescale
revised from
2024)
On Track Review will be complete by March 2025. Options explored by Health & Social Care and delivery of
Retirement model of housing is preferred with implementation plans underway.
Page 77 of 198

Page 78

35
Local Housing Strategy Annual Progress Report 2024
Strategic Housing Outcome 4: There are a range of housing options and supports which promote independence, health and wellbeing
Action Baseline 2019/20 Milestone Target Lead Timescale Status Progress 2023/24
KEY ACTION 4.6
Improve access to
specialist housing
Development of
housing options
training toolkit
underway
Incorporate specific housing options
information in relation to specialist provision
within the housing options training toolkit
Housing Options
Training toolkit
complete and rolled
out to staff
BDS 2023 Complete The management and future development of the Housing Options Training Toolkit has been
transferred to the Scottish Housing Network (SHN).
‘Making Life Easier’
developed with some
housing information
incorporated
Incorporate further housing information in
‘Making Life Easier’
‘Making Life Easier’
updated
BDS 2025
(timescale
revised
from 2024)
On Track Ongoing discussions with housing and health and social care to determine and provide relevant
housing information for MLE update.
- Increase awareness amongst housing staff
of the wider opportunities in MLE for health
and wellbeing to encourage wider ‘good
conversations’ at service contact points by
housing staff around health and wellbeing
Awareness increased BDS 2024 Complete All housing staff aware of MLE.
Pilot of ‘Adapting
for Change’ training
carried out
Progress ‘Adapting for Change’ bespoke
North Lanarkshire e-learning module and
group training to increase awareness of
prevention and early intervention
E-learning module
developed and rolled
out to staff
BDS/
H&SC
2024 Complete E-learning module developed and rolled out.
KEY ACTION 4.7
Improve the use of
technology to help
enable independence,
inclusion and promote
better outcomes
Working group
established to progress
pilot
Complete SMART Homes pilot in Kerr Grieve
Court to identify potential technology options
for older people’s housing                                                                                                                              
Action removed - refer to revisions table
Pilot complete BDS 2025 Not
applicable
Action no longer applicable due to ethical issues and the council’s approach to technology in the
provision of older people’s housing.
Initial scoping exercise
carried out
Develop interactive SMART Home standard
for council new build homes to ensure digital
infrastructure supports telecare, telehealth
and digital connectivity requirements for
the future
Standard developed NS 2026 Complete New homes designed by NLC will have Cat5E installed as this is in the Employers Requirements
Digital NL underway Engage in the Digital NL developments and
Digital Health and Care Strategy
Completion of Digital
NL
BDS 2026 On Track Both ASB and rents online reporting is live. A procurement process has been completed to
appoint contractors to develop a replacement for HSMS including Housing Asset Management. 
Implementation is now underway with estimated completion in March 2027.
‘Tech flat’ developed Increase awareness and use of technology
by promoting the ‘tech flat’
Increase tech flat
viewings
BDS/
H&SC
2026 On Track 2023/2024 - 131 service users visits and 264 staff visits have been undertaken. Flat is now rented
from Clyde Valley.
Working group
established
Transition from analogue to digital alarm
services across older people’s housing
Digital transition
complete
BDS/
HP
2026 Complete All Sheltered Housing Systems have been successfully switched over to digital protocols.
Page 78 of 198

Page 79

36
Local Housing Strategy Annual Progress Report 2024
Strategic Housing Outcome 4: There are a range of housing options and supports which promote independence, health and wellbeing
Action Baseline 2019/20 Milestone Target Lead
Service
Timescale Status Progress 2023/24
KEY ACTION 4.8
Enable swifter discharge
from hospital and reduce
delayed discharge
Weekly meetings
established
Establish and maintain housing representation
at weekly discharge meetings to prevent and
resolve any housing related delayed discharges
Maintain
representation and
identify solutions
HS 2026 Complete Action complete. Housing representation ongoing.
Resource flats
in place across
3 retirement
complexes
Replace resource flats within retirement
complexes with mainstream accommodation
to meet a broader range of hospital discharge
related needs
Replace flats
with alternative
mainstream
accommodation
BDS/HS 2023 Complete Resource flats replaced with two new build accessible properties from Clyde Valley.
Monitoring system
in place with H&SC
review required
Monitor efficacy of resource flats in meeting
needs
Monitoring system
in place
BDS/
H&SC
2026 Complete Replacement resource flats identified and operational - usage monitored by social work.
KEY ACTION 4.9
Improve our
understanding of the
housing and related
support needs of ethnic
minority groups and
others who experience
disadvantage and
inequality
- Implement collation of equality monitoring
information across tenants' and residents’
groups and people involved in tenant
participation processes
Equality monitoring
system in place and
analysis undertaken
BDS 2023 Complete Equality monitoring is now collected for NL Federation who act as the umbrella organisation for
all tenants and residents organisations.  Recording of equalities data for Committee Members
across Tenants and Residents Groups mechanism has been established. 
Ethnicity, Age and
Disability currently
gathered
Revise the Common Housing Register
Form to include collation of other protected
characteristics information.  
Action removed - refer to revisions table
Common Housing
Register Form
revised
BDS 2023 Not
applicable
Unable to collect at present due to current IT system issues. Equalities information will be
included in an online form as part of the replacement for HSMS.
Corporate Equalities
Group established
Participate in the council’s Corporate Equalities
Group
Continuous
participation
BDS 2026 On Track Corporate group continues to meet and action plan developed which contains housing specific
actions.
Housing Co-
production Group
established since
2010
Continue the Housing Co-production Group and
explore expansion of the group to incorporate
more members from under-represented groups
Continue and expand
the Housing Co-
production group
BDS 2026 Complete New Tenant Participation Strategy published which includes actions relating to increasing
involvement from under-represented groups.
LGBT module
developed
Ensure housing staff complete LGBT training
module to improve awareness of barriers
and improve housing information, advice and
support
Action removed - refer to revisions table
All housing staff
complete training
BDS 2024 Not
applicable
E-learning module no longer available on the council’s e-learning platform for staff to complete.
Pilots underway
across 3 local
authority areas
Explore negotiated stopping for Gypsy
Travellers
Negotiated stopping
procedure explored
and implemented if
feasible
BDS 2025 On Track Draft report published from the SG on negotiated stopping. To be considered by the strategic
group.
Action plan
developed
Progress the actions contained within the
Gypsy Traveller Action Plan to improve
outcomes for Gypsy Travellers in North
Lanarkshire
Completion of actions BDS 2026 On Track Pan Lanarkshire Gypsy Traveller Action Plan established comprising both North and South
Lanarkshire. Action plan revised.
Page 79 of 198

Page 80

37
Local Housing Strategy Annual Progress Report 2024
Strategic Housing Outcome 4: There are a range of housing options and supports which promote independence, health and wellbeing
Action Baseline 2019/20 Milestone Target Lead
Service
Timescale Status Progress 2023/24
KEY ACTION 4.9 (CONT.)
Improve our understanding
of the housing and related
support needs of ethnic
minority groups and
others who experience
disadvantage and inequality
Violence Against
Women Group
established
Work with the Violence Against Women Group
to develop a Violence Against Women Strategy
Strategy complete BDS 2024 Complete Strategy developed and published.
‘Safe and Together’
training currently
provided to H&SC
staff
Roll out ‘Safe and Together’ training for
housing staff
Staff trained BDS 2024 Complete NLC housing staff continue to be trained and training extended to include RSL staff.
DAART e-learning
now available
on the council’s
e-learning platform
Roll out Domestic Abuse Awareness Raising
Training (online – DAART) to all housing staff
Staff trained BDS 2023 Complete The number of people within housing who have completed DAART for 2023/24 is 25 as at
August 2024.
Pathway plan
developed
Review Care Pathways for Care Experienced
Young People and for young people with
complex needs transitioning from care
Pathway reviewed BDS/
H&SC
2024 Complete Revised protocol arrangement in place, with CEYP Housing Champions and CEYP operations
group established.
Page 80 of 198

Page 81

38
Local Housing Strategy Annual Progress Report 2024
Strategic Housing Outcome 5: We will tackle climate change and fuel poverty
Action Baseline 2019/20 Milestone Target Lead
Service
Timescale Status Progress 2023/24
KEY ACTION 5.1
We begin a just
transition towards
a Net Zero North
Lanarkshire
Pilots in progress Adopt ‘as standard’ non-gas heating approaches
for new council homes
Adopt new approach NS 2024/25 Complete Works have commenced at Brandon Street/YMCA but due to site delays are expected to complete
later in the year. Homes will include Ground Source Heat Pumps.
Separate
specifications and
processes exist
Integrate approach to procuring and maintaining
renewable energy installations
Adopt joint technical
specifications for use
of Air Source Heat
Pumps
HP/NS 2021/22 Complete New homes are being designed to include non gas heating systems as this is now a requirement
set by Building Standards. This is a standard specification in New Supply Employers Requirements.
Establish process for
agreeing new technical
solutions for alternative
heating systems
HP/NS 2021/22 Complete Handover of new homes includes demonstrations of how the low/zero carbon new technologies
work to allow housing staff to property manage them. Videos and Spec details are provided
- Develop understanding of whole life costs and
issues associated with the transition to low and
zero carbon heat on the council and its tenants
Evaluate impact of
Alternative Heating
pilots
HP/NS 2026
(timescale
changed
from 2024)
On Track 48 units at Brandon St due to complete 2023/24
- Investigate opportunities for district heat zones Improved
understanding to
inform strategic
approach in LHEES
CE 2022/23 Complete Potential heat network zones in North Lanarkshire identified and set out in the published Local
Heat and Energy Efficiency Strategy
Feasibility Study 
underway
We will work with our GCR partners to carry out
a feasibility study to outline a clear route map
to successfully deliver the large scale retrofit
programme
Route map BDS/HP 2024 Complete Feasibility study complete.  No further progress.
- To address skills gaps and meet the demands
of the City Region new homes and green energy
retrofit programmes we will develop an integrated
skills employment programme for housing build
and repair programmes in the GCR
Skills development 
programme 
developed
BDS/NS 2024 On Track GCR authorities have collaborated with SDS to prepare a heat decarbonisation study to understand
potential skills gaps across the GCR. The Colleges Partnership West have recently concluded a
study considering decarbonisation and retrofit skills across the 6 colleges to understand existing
skills development and how this can support retrofit activity. Also prepared a Retrofit Strategy &
Action Plan which has 5 focus areas including ‘maintenance and disrepair’ which is an emerging
challenge affecting the cost and effectiveness of home retrofit.
Page 81 of 198

Page 82

39
Local Housing Strategy Annual Progress Report 2024
Strategic Housing Outcome 5: We will tackle climate change and fuel poverty
Action Baseline 2019/20 Milestone Target Lead
Service
Timescale Status Progress 2023/24
KEY ACTION 5.2
We improve the
energy performance
of our housing
stock
100% compliance All council new builds meet NLC New Build
Sustainability Standard (which is currently
for Silver Aspects 1&2)
100% compliance with
standards subject to annual
review
NS Annual On Track Continuing to deliver homes meeting desired Sustainability Standards.
- Develop ‘route map’ for EESSH2
compliance
Route map developed HP 2021/22 Complete Action complete, consultants commissioned to project scope, scale and costs of works
required. This work included meeting EESSH2 and net zero. EESSH2 is no longer a standard for
social housing and is being replaced by a new Social Housing Net Zero Standard (SHNZS).
82% of homes in PRS
meet EPC D (home
analytics data)
Enforce private rented sector energy
efficiency regulations and engage with
private landlords to improve compliance
Local Energy Efficiency in the
PRS Strategy developed
PSH 2024 
(timescale
changed to
2026)
On Track This is delayed and linked to the progress of the Heat & Buildings Bill and the Housing
(Scotland) Bill which include new energy efficiency requirements in the PRS as well as a Rental
Sector Strategy. These Bills were introduced in Parliament in March 2024 and are now in the
Parliamentary process.
Complete Revised application process ensures that all new and renewal applications have a suitable EPC
for the property(s) within the landlords portfolio. 
£14.5 million of
EES:ABS funding
invested in homes in
North Lanarkshire and
1,000 owners assisted
Manage Energy Efficient Scotland: Area
Based Scheme (EES:ABS) in
North Lanarkshire
Dependent on annual
allocation of funding - £2.78m
allocated for 2021/22
HP Annual On Track In 2023/24 £1.4m of the £2.9m budget was invested in privately owned homes, the highest
its been for 4 years
KEY ACTION 5.3
We help households
out of fuel poverty
ASHP installed in
316 existing homes
with further 40 new
builds planned for
ASHP/Solar PV/
Battery Storage – data
monitoring agreed for
future contracts
Evaluate impact of low-carbon heating on
tenants’ energy use and costs to ensure
‘just transition’
Evaluate Energy Use,
Effectiveness and Tenant
Satisfaction
HP/NS 2024/25 On Track Energy usage and performance is being monitored for the homes included in the pilot at
Dykehead Road
23% Improve energy efficiency and fuel poverty
advice
Develop strategic partnership
with Home Energy Scotland
BDS 2021/22 Complete Training provided to 15 Housing locality staff in October 2024 by the Wise Group on the HEAT
Service and NL Energy and Advice Service.
Limited understanding
based on national
data sets
Improve understanding of the extent,
nature and location of fuel poverty
to enable better identification of fuel
poor households and target resources
effectively
Develop measures to better
identify fuel poor households,
enabling better targeting of
resources
BDS 2022/23 Complete Information on various heating systems provided on North Lanarkshire Council’s website. NL
Energy Advice Service continues to provide households with support on fuel debt, advice on
reducing energy bills and signposting to household energy funds, as well as other services to
help reduce financial hardship and increase household income. Information published on North
Lanarkshire Council’s website in relation to this service.
Page 82 of 198

Page 83

40
Local Housing Strategy Annual Progress Report 2024
Strategic Housing Outcome 6: Our homes will be fit for the future
Action Baseline 2019/20 Milestone Target Lead
Service
Timescale Status Progress 2023/24
KEY ACTION 6.1
Ensure social rented
housing continues
to meet regulatory
standards
- Deliver priority actions set out in Housing Asset
Management Plan
Actions progressed BDS 2025/26
with annual
review
On Track Annual Review of HAMP 2023/24 updated and completed.
- Develop route map to compliance for NLC housing
stock
Route map
developed and
implemented
HP 2021/22 Complete Route map implemented
- Establish NLC/RSL asset management forum to
share good practice and develop shared approach
Forum established BDS 2022/23 Complete A Housing Asset Management Forum was held in December 2023 with the council and some RSLs.
Low interest from partners in a continuing forum - alternative wider asset management forum in
place via SHN.
KEY ACTION 6.2
Improve stock condition
in mixed tenure and
other priority blocks and
estates
- Develop new owner engagement strategy for
mixed tenure estates
Strategy developed
and implemented
HP/PSH 2022 Complete A range of interventions have been implemented to encourage owner engagement. This includes
EES:ABS; OMPS to purchase homes from last remaining owner to complete common works, private
landlord forum, under one roof events for private landlords amongst other measures. Collectively
these measures form an approach/strategy to effectively help manage mixed tenure estates.
Engagement
underway
Complete CPOs at Millcroft and enable
transformation by Sanctuary (subject to committee
approval)
CPOs complete
and demolition
undertaken
NS Ongoing On Track 5th Hearing has concluded CPO proceedings on 27th August 2024. Evidence report is to be
submitted and following this the Reporter will make a decision as to whether or not to confirm the
CPO.
- Pilot new approach to identifying and responding
to priorities, using landlord registration powers to
improve house condition
Pilot complete PSH 2021/23 Complete New repairing standard and Tolerable standard audit process now in place. Over 90 visits carried
out year to date.
- Explore development of a factoring support system
to assist owner occupiers who fail to secure a
factor
Development of
factoring support
system explored
PSH 2024 Complete Factors from both RSL’s with a factoring arm and private sector factors were approached. It was
apparent that RSL’s Factoring services were not looking to expand their services and their key aim
was to provide a service to owners who co-owned property within blocks where they also had flats. 
Collectable fees for services were also a primary concern as RSL’s could not risk financial deficit. 
Similarly private sector factors need to ensure that the costs for provision of services was covered. 
The financial criteria for factors from both service areas made it impractical to push owners
towards these organisations with a view to asking that they take on a properties. An option for an
NLC in-house factoring provision was also explored but found to carry a high financial risk and
would require staff with specialist knowledge and was therefore not progressed.
- Develop a new BTS statement BTS statement PSH 2026 Not yet
started
Recording BTS, Repairing standard, Nuisance and Tolerable standard information. Revised
processes implemented. 
- Explore the use of ‘missing shares’ powers to
assist owners to participate in works
Missing shares
powers explored
PSH 2024 Complete Options explored, but no financial funding to operate Missing Shares Scheme. No longer a viable
action.
- Explore the feasibility of carrying out a house
condition survey to gather better data in relation to
scale and extent of disrepair in the private sector
Feasibility exercise
complete
BDS/
PSH
2026 Complete A revised Scheme of Assistance was published and is in operation.
Page 83 of 198

Page 84

41
Local Housing Strategy Annual Progress Report 2024
Strategic Housing Outcome 6: Our homes will be fit for the future
Action Baseline 2019/20 Milestone Target Lead
Service
Timescale Status Progress 2023/24
KEY ACTION 6.3
Ensure owners are
engaged and informed
about repair and
maintenance issues
New Scheme of
Assistance being
developed
Develop new Scheme of Assistance Scheme of
Assistance adopted
PSH 2022/23 Complete A revised Scheme of Assistance was published and is in operation.
Strategic Housing Outcome 7: We improve the quality and accessibility of the private rented sector
Action Baseline 2019/20 Milestone Target Lead
Service
Timescale Status Progress 2023/24
KEY ACTION 7.1
Develop and deliver
new PRS access
scheme
- PRS access scheme developed
Action removed - refer to revisions table
Scheme developed
and approved
BDS 2022 Not
applicable
Unable to proceed due to lack of interest from landlords
41 (2020) Scheme implemented and enabling better
access to the PRS
Action removed - refer to revisions table
20 new tenancies
each year
BDS Ongoing
from 2022
Not
applicable
Unable to develop a PRS Access Scheme at current time due to multiple demands on PRS stock
including Ukrainian resettlement and asylum dispersal.
KEY ACTION 7.2
Improve private sector
housing advice
- Develop and deliver e-learning training
module on the PRS and ensure completion by
all housing staff that deliver housing options
advice
Training developed
and staff trained
BDS 2023 On Track The online training module on Private Sector Housing Options was updated in March 2024.
- Establish local PRS champions to encourage
wider improved PRS advice amongst locality
housing teams
Action removed - refer to revisions table
At least one ‘PRS
champion’ in each
local housing office
BDS 2023 Not
applicable
Annual Landlord Forum held in April 2024 and Newsletters published.
- Develop improved information for locality
housing teams on the PRS in North
Lanarkshire and at a locality level as part of
the housing options guide
PRS information
developed and
updated regularly
for locality housing
teams
BDS 2023 On Track Surveyed landlords on PRS access scheme in October Newsletter. Further surveys will be completed via
Private Landlord Forum and future Newsletters.
Page 84 of 198

Page 85

42
Local Housing Strategy Annual Progress Report 2024
Strategic Housing Outcome 7: We improve the quality and accessibility of the private rented sector
Action Baseline
2019/20
Milestone Target Lead
Service
Timescale Status Progress 2023/24
KEY ACTION 7.3
Work with private
landlords to improve
management and
quality standards in
the PRS
14,832 Improve registration compliance through targeting
unregistered landlords and landlords whose registration
has expired to ensure they register
Improved
registration
compliance
PSH Ongoing Complete Registration and compliance process reviewed and updated procedures implemented.
- Strengthen partnerships with Police Scotland and Fire
and Rescue to identify criminal activity and to take multi
agency action through the locality community planning
structures
Improved processes
for ensuring private
landlords are ‘fit
and proper’
PSH Ongoing Complete Review of ‘Fit and Proper’ person panel has been completed.
- Work in partnership with Landlord Accreditation Scotland
to deliver training for private landlords and letting agents
in North Lanarkshire
Training delivered PSH Ongoing Complete Have adopted a best practice/value for money approach to delivering training and seminars via
Landlord Accreditation Scotland on a case by case basis.
- Review the current information provision for private
landlords on the council website and develop enhanced
and improved information which clearly outlines private
landlords’ responsibilities and rights
Information
reviewed and
improved
PSH/
BDS
2023 Complete Website information reviewed and updated.
- Re-establish the bi-annual private landlord forum Private landlord
forum held
biannually
PSH/
BDS
2022 Complete Private Landlord Forum re-established. Last meeting held online in April 2024.
- Establish a process to regularly communicate with
landlords through the landlord registration team on
legislative or other policy changes of relevance
Process established PSH 2022 Complete Email system in place. Awaiting the development of a SMS system by the registers service
- Develop and issue a bi-annual private landlord
e-newsletter
Newsletter issued BDS/
PSH
2023 Complete Latest newsletter produced October 2024.
- Strengthen our outreach and engagement with private
landlords using online platforms
Improved outreach
and engagement
PSH Ongoing On Track Regular webinars are taking place. Annual Landlord Forum held in April 2024 and Newsletters
published. 
- Carry out regular surveys of private landlords to
understand challenges and potential solutions to improve
management and quality standards in the PRS
Surveys carried out BDS Ongoing On Track Surveyed landlords on PRS access scheme in October Newsletter. Further surveys will be
completed via Private Landlord Forum and future Newsletters.
Page 85 of 198

Page 86

43
Local Housing Strategy Annual Progress Report 2024
Strategic Housing Outcome 7: We improve the quality and accessibility of the private rented sector
Action Baseline
2019/20
Milestone Target Lead
Service
Timescale Status Progress 2023/24
KEY ACTION 7.3
Work with private
landlords to improve
management and quality
standards in the PRS
- Improve our understanding and intelligence of the
PRS to identify issues and target resources effectively
e.g. identifying properties most in need of energy
efficiency measures
Improved
intelligence on PRS
BDS Ongoing On Track Audit process is ongoing. An effective method to retain data that will match with existing IT
system is being considered.
- Scope potential gains from ‘direct interventions’ in
substandard PRS properties, such as purchase and
improvement in certain circumstances
Scoping exercise
complete
BDS 2023 Complete Paper developed scoping out options to extend the OMPS. 
- Develop an engagement strategy for improving energy
efficiency regulations in the PRS which will include
a communications and involvement strategy and
enforcement approach
Engagement
strategy developed
BDS/
PSH
2026 
(timescale
revised
from 2022)
Not yet
started
EPC recording now operational and checks in place to ensure property meets minimum standard
collected via landlord registration. Heat & Buildings Bill consultation ended in March, feedback
being considered by the Scottish Government in relation to the proposals which relate to energy
efficiency. This action is dependent on the HIB Bill progressing through parliament stages.
KEY ACTION 7.4
Improve access to the
PRS
- Work with private landlords to improve access to the
PRS for people who are homeless and prevent PRS
households from becoming homeless
Improved outcomes
for homeless
households in the
PRS
BDS Ongoing On Track Work ongoing with landlords to improve access and prevent homelessness. However, significant
challenges remain in preventing homelessness for some applicants due high costs pushing them
into multiple debt and unable to afford their rent.
- Establish a private landlord working group to identify
ways in which the PRS could better contribute to
meeting housing needs in North Lanarkshire
Action removed - refer to revisions table
Private landlord
working group
established
BDS/
H&SC
2023 Not
applicable
No interest to date, private landlord forum provides a vehicle for involvement
- Work with partner RSLs developing Private Lettings
Services in North Lanarkshire to meet housing need
better, exploring opportunities linked to RRTP
Action removed - refer to revisions table
RSL PSL service
linked to RRTP
BDS 2023 Not
applicable
Proposal paper developed in 2023. Unable to develop a PRS Access Scheme at current time due
to multiple demands on PRS stock including Ukrainian resettlement and asylum dispersal. 
- Review the rent deposit guarantee scheme to increase
uptake
Rent deposit
scheme reviewed
BDS 2023 Complete Scheme revised and promoted on council website, alongside continual promotion by staff as part
of housing options.
KEY ACTION 7.5
Improve involvement
of tenants in the
PRS to improve our
understanding of issues
and help shape policy
- Establish a PRS tenant panel as part of the tenant
participation activities to identify issues, develop
potential solutions and shape policy to improve the
PRS
Action removed - refer to revisions table
Panel established BDS 2023 Not
applicable
Tenant & Resident participation is inclusive and involves tenants from across tenures, although
very small numbers of PRS tenants which means establishing a PRS tenant panel is not feasible.
Page 86 of 198

Page 87

44
Local Housing Strategy Annual Progress Report 2024
Strategic Housing Outcome 7: We improve the quality and accessibility of the private rented sector
Action Baseline
2019/20
Milestone Target Lead
Service
Timescale Status Progress 2023/24
KEY ACTION 7.6
Improve advice and
information to PRS
tenants
- Review and improve the information available for
PRS tenants by working with the PRS tenant panel
to identify gaps and scope for improvement
Action removed - refer to revisions table
Information
reviewed and
improved
BDS 2024 Not
applicable
Very small numbers of PRS tenants engaged in tenant and resident groups which means establishing
a PRS tenant panel is not feasible. A survey will be issued through Gov.Delivery to seek views from
PRS tenants on website content. Reviewed other LA websites to identify any areas for improvement.
- Develop a communications strategy which
involves greater use of social media and online
platforms to increase awareness of tenants rights,
responsibilities and housing options
Communications
strategy developed
BDS/ PSH 2024 Complete Information available on council website for PRS tenants and reviewed on a regular basis which
provides information on rights and responsibilities.   
KEY ACTION 7.7
Support Build to Rent
and Mid-Market Rent
to deliver high-quality
homes in the PRS
- Work with employers to gather information on the
housing needs of key workers
Information
gathered
BDS Ongoing Complete Employer survey complete. Follow-up focus groups/ interviews being arranged.
- Engage with the Build to Rent sector Engagement with
the Build to Rent
sector
BDS/ NS Ongoing On Track Engagement has taken place with developers and will continue to explore options through adhoc
discussions
- Deliver Mid-Market Rent Homes with RSL partners Deliver Mid-Market
Rent homes
BDS/ NS Ongoing On Track 24 MMR homes delivered by RSLs in 2023/24.
KEY ACTION 7.8
Develop a longer-term
strategic approach to
improving the PRS
- Develop and implement PRS strategy, following
publication of the new national Rented Sector
Strategy, to outline issues and solutions in a more
detailed  longer-term plan for North Lanarkshire
PRS Strategy
developed and
implemented
BDS/ PSH 2024 
(timescale
changed to
2026)
Not yet
started
This is delayed and linked to the progress of the Heat & Buildings Bill and the Housing (Scotland) Bill
which include new energy efficiency requirements in the PRS as well as a Rental Sector Strategy. 
Theses Bills were introduced in Parliament in March 2024 and are now in the Parliamentary process. 
Page 87 of 198

Page 88

45
Local Housing Strategy Annual Progress Report 2024
Revisions Log
Action Milestone Revisions made Reasons
KEY ACTION 1.1
Deliver alternative tenure
housing to meet a broad
range of needs and deliver
sustainable, inclusive and
diverse communities
Establish a Housing Delivery Partnership to deliver MMR and
other alternative tenure to ensure readiness should market
conditions allow for council delivery of alternative tenure
Action removed Establishing a HDP should market conditions allow for council delivery in the future is not viable due to costs and governance
arrangements still being required in the interim whilst a HDP is dormant. MMR is being progressed with Airdrie identified as a pilot
area.  A HDP will therefore be established as part of this rather than as a vehicle to lie dormant. Delivery vehicles are being explored
to identify the appropriate model for council delivery.  
KEY ACTION 4.5
Improve the suitability of
existing housing to meet the
needs of  older people
Carry out review of RSL housing support for sheltered housing
and very sheltered housing
Timescale changed from
2024 to 2025
Review nearing completion but will not be complete until 2025. Revised timescale required due to increased complexity and time
required to complete the review working with a range of RSLs, tenants, families, carers and other stakeholders.
KEY ACTION 4.6
Improve access to specialist
housing
Incorporate further housing information in Making Life Easier Timescale changed from
2024 to 2025
Housing information provided for MLE but further review required to identify if there is scope for enhanced housing information. This
may require some I.T. updates.
KEY ACTION 4.7
Improve the use of technology
to help enable independence,
inclusion and promote better
outcomes
Develop SMART Home standard for council new build homes
to ensure digital infrastructure supports telecare, telehealth
and digital connectivity requirements for the future
Indicator change from ‘new
build technical report’ to
‘standard specification’
Complete SMART Homes pilot in Kerr Grieve Court to identify
potential technology options for older people’s housing
Action removed Action no longer applicable due to ethical issues and the council’s approach to technology in the provision of older people’s housing.
KEY ACTION 4.9
Improve our understanding of
the housing and related support
needs of ethnic minority groups
and others who experience
disadvantage and inequality
Ensure housing staff complete LGBT training module
to improve awareness of barriers and improve housing
information, advice and support
Action removed LGBT e-learning module is no longer available on the council’s learning platform for staff to complete.
Revise the Common Housing Register Form to include
collation of other protected characteristics information
Action removed Unable to collect at present due to current IT system issues. Equalities information will be included in an online form as part of the
replacement for HSMS.
KEY ACTION 5.1
We begin a just transition
towards a Net Zero North
Lanarkshire
Develop understanding of whole life costs and issues
associated with the transition to low and zero carbon heat on
the council and its tenants
Timescale changed from
2024 to 2025
This action is dependent on completion of the net zero site at Dykehead Road to enable an evaluation of life costs associated with
zero carbon heating systems. This action is now linked to wider GCR activity and has involved the use of technology and sensors to
capture data in net zero homes and other homes with other heating system types and energy efficiency measures. Additional time is
required to enable deployment of these sensors and analysis of the data collated.
Enforce private rented sector energy efficiency regulations
and engage with private landlords to improve compliance
Timescale changed from
2024 to 2025
This is delayed and linked to the progress of the Heat & Buildings Bill and the Housing (Scotland) Bill which include new energy
efficiency requirements in the PRS as well as a Rental Sector Strategy. Theses Bills were introduced in Parliament in March 2024
and are now in the Parliamentary process.
KEY ACTION 7.1
Develop and deliver new PRS
access scheme
PRS access scheme developed Action removed Unable to proceed due to lack of interest from landlords
Scheme implemented and enabling better access to the PRS Action removed Unable to develop a PRS Access Scheme at current time due to multiple demands on PRS stock including Ukrainian resettlement and
asylum dispersal.
Page 88 of 198

Page 89

46
Local Housing Strategy Annual Progress Report 2024
Revisions Log
Action Milestone Revisions made Reasons
KEY ACTION 7.2
Improve private sector housing
advice
Establish local PRS champions to encourage wider improved
PRS advice amongst locality housing teams
Action removed No requirement to have PRS Champions as all housing staff have access to specific PRS training including localised information.
KEY ACTION 7.3
Work with private landlords
to improve management and
quality standards in the PRS
Develop an engagement strategy for improving energy
efficiency regulations in the PRS which will include a
communications and involvement strategy and enforcement
approach
Timescale changed from
2026 from 2022
The Heat in Buildings Bill will bring in new energy efficiency standards for the PRS. Consultation on the proposed new standards
ended in March 2024 - feedback is being considered in relation to the proposals. It is therefore necessary to wait until the new
requirements are confirmed before a strategic approach can be taken to enforcement and involvement.
KEY ACTION 7.4
Improve access to the PRS
Establish a private landlord working group to identify ways
in which the PRS could better contribute to meeting housing
needs in North Lanarkshire
Action removed There is no appetite from private landlords to establish a separate private landlord working group. This has been explored at the
private landlord forum, with no expressions of interest. The private landlord forum provides a way in which private landlords can work
with the council to identify ways in which the PRS can meed housing needs in North Lanarkshire.
Work with partner RSLs developing Private Lettings Services
in North Lanarkshire to meet housing need better, exploring
opportunities linked to RRTP 
Action removed Proposal paper developed in 2023. Unable to develop a PRS Access Scheme at current time due to multiple demands on PRS stock
including Ukrainian resettlement and asylum dispersal.
KEY ACTION 7.5
Improve involvement of tenants
in the PRS to improve our
understanding of issues and
help shape policy
Establish a PRS tenant panel as part of the tenant
participation activities to identify issues, develop potential
solutions and shape policy to improve the PRS
Action removed Tenant & Resident participation is inclusive and involves tenants from across tenures, although very small numbers of PRS tenants
which means establishing a PRS tenant panel is not feasible.
KEY ACTION 7.6
Improve advice and information
to PRS tenants
Review and improve the information available for PRS tenants
by working with the PRS tenant panel to identify gaps and
scope for improvement 
Action removed Very small numbers of PRS tenants engaged in tenant and resident groups which means establishing a PRS tenant panel is not
feasible. A survey will be issued through Gov.Delivery to seek views from PRS tenants on website content. Reviewed other LA
websites to identify any areas for improvement.
KEY ACTION 7.8
Develop a longer-term strategic
approach to improving the PRS
Develop and implement PRS strategy, following publication
of the new national Rented Sector Strategy, to outline issues
and solutions in a more detailed  longer-term plan for North
Lanarkshire
Timescale changed to 2026
from 2024
This is delayed and linked to the progress of the Heat & Buildings Bill and the Housing (Scotland) Bill which include new energy
efficiency requirements in the PRS as well as a Rental Sector Strategy. These Bills were introduced in Parliament in March 2024 and
are now in the Parliamentary process. 
Page 89 of 198

Page 90

47
Local Housing Strategy Annual Progress Report 2024
Page 90 of 198

Page 91

CC_2024_00509
Produced by
NORTH LANARKSHIRE COUNCIL
Enterprise and Communities
Housing Strategy Team
Business Development and Support
Civic Centre
Windmillhill Street
Motherwell ML1 1AB
e. localhousingstrategy@northlan.gov.uk
NORTHLANARKSHIRE.GOV.UK Page 91 of 198

Page 92

Page 92 of 198

Page 93

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ⊠ Yes  ☐ No
Ref    SW/CB/LK Date 12/02/25 
Housing Outline HRA Capital Programme 2025/26 
From  Stephen Llewellyn, Chief Officer (Housing)  
E-mail llewellyns@northlan.gov.uk  Telephone 07583097785 
Executive Summary 
The purpose of this report is to seek approval from the Housing Committee for the
mainstream Housing Capital Programme (excluding new supply) for 2025/26. 
Recommendations
It is recommended that the Housing Committee. 
(1) Approve the Housing Revenue Account (HRA) Capital Programme for 2025/26 as
outlined in Appendix 1. 
The Plan for North Lanarkshire 
Priority  Improve North Lanarkshire's resource base
Ambition statement All ambition statements
Programme of Work All Programmes of Work 
Item 6
Page 93 of 198

Page 94

1. Background 
1.1 Committee will recall that a 5-year outline HRA Capital Programme from 2021/22 to
2025/26 was approved in May 2020 providing for investment of over £266million. To
date, this spend has increased as shown in Table 1 through increased Prudential
Borrowing and increased levels of Capital Funded from Current Revenue (CFCR). The
reasons for these increases in spend are detailed in the following sections. 
1.2 Financial year 2025/26 presents the last year of the current 5-year plan with a new plan
covering 2026/27 – 2030/31 due to be submitted for approval by Committee later 
within the 2025/26 financial year. 
1.3  As outlined in previous reports, new priorities and requirements have been introduced
throughout the timeframe of the current five-year plan which have been incorporated 
as required. 
1.4 One of the continuing main priorities of the investment plan is the improvement of the
energy efficiency of tenant's homes and meeting the Scottish Housing Quality Standard
(SHQS) which incorporates the energy efficiency in Scottish social housing (EESSH2)
standard. The EESSH2 standard requires that all social housing should achieve a
minimum Energy Performance Certificate (EPC) rating of D by December 2025 and
meet an EPC band B or be as energy efficiency as possible by the end of December
2032 (within the limits of cost, technology and necessary consent). 
1.5       The EESSH2 standard is due to be replaced by a new Social Housing Net Zero 
Standard (SHNZS) which is currently understood will not be brought into force before
2025. In addition, the associated new Heat in Building Standard Delivery plan is due to
be published in 2025 which would prohibit the use of polluting heating sources (such
as gas, oil or LPG boilers) for all buildings from 2045. 
1.6       Other legislation which came into force in 2024 which will influence future investment 
includes the Housing (Cladding Remediation) (Scotland) Act which requires owners of
buildings with cladding to undertake an assessment process, record the findings and
any actions taken within a published register.   
1.7 The current five-year plan started during the pandemic and was affected by the issues
that occurred during that period. A number of challenges that occurred then are still
impacting the programme, such as contractor availability and building material costs
which have increased 37% since 2020. 
1.8 Other external factors are also in place which influence ongoing investment plans.     
The Energy price cap which fixes the maximum price that can be charged for units of
energy on a standard tariff fell in April and July 2024 but increased again in October
2024 and in January 2025.
1.9 The Office for National Statistic (ONS) reported in October 2024, around half of adults
had stated that their cost of living had increased in the previous month with 72% quoted
the increase related to their gas and electricity bills. In relation to Scotland, the Scottish
Government’s July 2024 Scottish Economic Bulletin reported 60% of households are
spending less on non-essentials with 41% reporting spending less on fuel in their
homes. Although it is understood why such actions may be taken by tenants, not
heating homes properly can have an impact on the fabric of buildings and exacerbate
potential damp and mould issues. 
Page 94 of 198

Page 95

1.10 Committee can be assured that action continue to be taken to reduce, wherever
possible, the impact of external issues on investment decisions for tenants’ homes.
More details of the type of works proposed within the 2025/26 capital programme are
provided in the report. 
2. Report 
Capital Resources – HRA Programme 
2.1 As part of the current five-year investment plan, detailed spend proposals for 2025/26
have been prepared for Committee’s consideration as outlined in Appendix 1. 
2.2 As outlined in previous reports, delivery of the programme was impacted by the Covid-
19 pandemic and Brexit resulting in a reprofiling of the investment. Table 1 illustrates
the spend that has occurred during the current five-year plan. 
Table 1 
2021/22  2022/23 2023/24 2024/25 2025/26 Total 
£000 £000 £000 £000 £000 £000
Original
Working
Capital
Programme
74,379 60,745 60,882 73,825 76,617 346,448
Original
Slippage 
6,752 5,795 5,535 6,711 6,965 31,758
Original
Current
Capital
Programme
67,627 54,950 55,347 67,114 69,652 314,690
Reprofiled
Expenditure
(14,724) 2,027 119 (4,000) 16,578 -
Revised
Capital
Expenditure
52,903 56,977 55,466 63,114 86,230 314,690 
2.3 A target spend of £314.690m was approved for the 5-year period 2021/22 to 2025/26.It
is anticipated £228.460m of this will be achieved by the end of the  2024/25 financial
year with a balance of £86.230m to be achieved during 2025/26. 
2.4 A total  slippage allowance of £31.758m was recognised over the 5-year period and
has not been utilised to date. Slippage allowances of approximately 5% has been
added to the 2025/26 programme to arrive at a working programme of £90.616m as
outlined in table 2. This is in line with the investment targets included within the 2025/26
Revenue Estimates. 
2.5 The working programme in Table 2 considers the projected carry forward commitment
but may be subject to adjustment depending on the final outturn of the current 2024/25
programme.  
Page 95 of 198

Page 96

TABLE 2 – Resources 2025/26         
£000 
Prudential Borrowing       70,811           
Capital Funded from Current Revenue (CFCR)                     15,419 
Total projected resources       86,230
Slippage allowance          4,386 
Working programme        90,616 
**Pending approval of the Revenue Estimates 
HRA Capital Programme details 
Heating  
2.6 The 2025/26 programme will see the continuation of the replacement of existing heating
systems based on their age. Although tenants may not be immediately aware of the
advantages of having the heating systems in their home replaced, it should be noted
new systems can be up to 15-30% more efficient than older ones which means they
are using less fuel to produce heat. 
2.7 The council is cognisant of the forthcoming Heat in Buildings Standard which would
prohibit the use of polluting heating sources (such as gas, oil or LPG boilers) for all
buildings from 2045 and is currently increasing its use of “clean” heating sources such
as heat pumps and modern electric storage heater systems where practicable which
would not result in tenants potentially being placed in fuel poverty based on current fuel
costs. 
2.8 Problems can occur in relation to the retrofitting of renewable heating sources within
homes. To try to find solutions for such issues, the council, in association with West
Dunbartonshire Council, was awarded £150k from Scottish Enterprise’s Green Heat
Retrofit Innovation Challenge in 2024 which aims to support local public sector
landlords in the decarbonisation of heat in their housing stock. The challenge to the
private sector is to develop innovative new renewable heating solutions not currently
on the market for often very small flats and mixed tenure blocks where space for
equipment is at a premium or where building elements are in common ownership
making options such as air/ground source heat pumps not always feasible.
2.9 The current solar photovoltaic (PV) panel programme will be expanded with over 1330
installations planned for 2025/26 and over 12,000 installations planned to properties
throughout the Authority before the EESSH2 deadline of 2032.
2.10 As part of this programme, for tenants living in mixed tenure blocks, all efforts are made
to ensure that wherever possible, permission is gained from any owners to enable the
placing of PV panels serving tenants home on the commonly owned roof.
2.11 Other works which will continue throughout the 2025/26 programme will be the
installation of loft insulation where required and a further increase in the removal and
replacement of elderly cavity wall insulation to increase the energy efficiency of tenants’
homes. 
Page 96 of 198

Page 97

Windows/Door Replacement 
2.12 The backlog issues from 2023/24 regarding the council’s triple glazing programme were
resolved in 2024/25 with all addresses initially planned for 2023/24 prioritised and
completed in 2024/25. The programme for 2025/26 will now resume based on the
previous age profile for replacement of between 20-25 years. 
2.13 The programme of installing fire rated doors to flats in low rise flats will continue in 5
storey blocks of flats and any attached surrounding addresses. 
Roofing and Rendering 
2.14 The project of replacing the roofs and increasing the insulation levels in non-traditional
house types in Lomond Road area in Coatbridge which started in 2022/23 completed
in 2024/25 with the project now starting design work in 2025/26 for similar non-
traditional property types elsewhere in the Authority. 
2.15 The pilot project for the thermal upgrading of Swedish Timber style timber houses
started in 2024/25 with its continuation for the remaining other properties of similar
construction planned to start in 2025/26. In addition, design development work will start
on other timber construction type properties during the financial year 2025/26. 
2.16 Committee will be aware of the council’s approach of “fabric first” to improving energy
efficiency through the fitting of external wall insulation ahead of the consideration of the
installation of possible renewable heating sources. This approach is generally
recognised as the most effective manner of offsetting any possible increase in running
costs for renewable heating sources. Within 2025/26, external works are planned
across the Authority. 
2.17 As outlined in Section 1.7, costs are still rising which means prices for owners in mixed
tenure blocks have increased as well.  It is now estimated that owners would require to
pay on average over £15,000 per property to have external wall insulation work
undertaken to their homes.  Wherever possible, the council looks to support owners by
identifying options which may assist those being asked to consider paying such sums
to try to ensure as many tenants as possible benefit from the installation of external
wall insulation to their homes. 
2.18 The main source of funding which has been able to be utilised to assist owners is the
Scottish Government’s Energy Efficient Scotland: Area Based Scheme (EES: ABS) for
owners. The current EES:ABS programme will complete blocks of flats in Kilsyth,
Airdrie and Coatbridge with plans for further properties in Coatbridge, Airdrie and
Wishaw areas subject to confirmed ongoing funding within 2025/26. 
Lead pipe replacement 
2.19 The ongoing lead pipe replacement programme of testing and replacement of pipework
as required continues in 2025/26 with the focus moving to a testing programme due to
the extent of works undertaken to date. Any addresses requiring replaced on an ad hoc
basis will be undertaken as part of this programme. 
Controlled Door Entries 
2.20 In 2024/25, over 60 new systems are projected to be installed with the programme
continuing in 2025/26. 
Page 97 of 198

Page 98

2.21 In mixed tenure blocks, owners are required to pay for any work undertaken to the door
entry systems to common areas. With costs for such replacement systems now more
than £3,500 per owner, this has an impact on the council’s ability to install new systems
to closes but again, wherever possible the council will look to assist owners regarding
their legal obligations. 
Electrical Work 
2.22 Where a property is identified as requiring to be rewired, this will continue to be
undertaken as part of the 2025/26 programme. 
2.23  The council’s programme for the renewal of communal close lighting will also continue
in 2025/26 with the focus continuing to look at mixed tenure closes for which owners
share repair responsibilities for these systems with the council. 
2.24 Owners’ ability to pay for such works, which are now on average costing over £2,500
per property depending on the size/type of work, may have an impact on the council
being able to re-instate full close lighting systems. 
Kitchens and Bathrooms 
2.25 The mainstream programme for the replacement of kitchens first installed 20 years ago
will commence in 2025/26 in addition to properties where tenants have previously
refused works and/or works required in void properties. 
2.26 Changes to procedures during 2024/25 mean that the upgrading of elderly adapted
bathrooms will now start to be replaced in 2025/26. Information on where properties
will be offered this option is currently being collated and tenants will be contacted about
whether they wish this work undertaken. The programme will also include, where
appropriate, where tenants have previously refused works and/or works required in void
properties. 
Tower Strategy 
2.27 The replacement and refurbishment of lifts as required within towers will continue in
2025/26. 
2.28 Phase 3 of the sprinkler installation programme will also continue in 2025/26 with the
installation of sprinkler systems in two towers. 
2.29 Design work for external upgrading works to Whifflet and Calder Towers in Coatbridge
was completed in 2024/25 and the works are planned to start on site later in 2025/26. 
Ambition 
2.30 Demolition work to Coursington, Allan and Draffen Towers in Motherwell was
suspended due to technical issues but restarted in late 2024 with surveys and external
cladding removal now nearing completion. A recommendation has been developed by
the principal contractor for the demolition method and this is the subject of another
report at Committee. 
2.31 Demolition work to Jackson Court, Coatbridge continues with completion due later in
2025/26, and tenders are being prepared for the demolition of Dunbeth Court to enable
both towers to be demolished consecutively.
Page 98 of 198

Page 99

2.32  Following the completion of refurbishment and demolition surveys at Allershaw Tower,
Wishaw a contract for the demolition will be awarded in early 2025/26 and will be
progressed following the completion of the Gowkthrapple low rise block demolitions.
Community Care 
2.33 Upgrading works to Drummond Drive Retirement Housing Complex are due to start on
site later in 2025/26. 
2.34  The pilot project to install platform lifts to be installed to John Smith Court Retirement
Housing Complex, which was delayed from 2024/25 due to design requirements, will
start in 2025/26. Later in 2025/26, all other lifts will also be installed as originally
planned. 
2.35 The installation of fire rated front doors to flats within complexes which started in
2024/25 will continue throughout 2025/26 in addition to fire stopping works to the same
addresses. The age profile and capacity of the residents of the complexes in terms of
ease of opening and closing their front doors was taken into consideration in relation to
the specification for the works. 
3. Measures of success 
3.1 Provide safe, improved and sustainable domestic properties for the tenants of North
Lanarkshire Council. 
3.2  Ensure the domestic properties within North Lanarkshire Council’s housing stock
continue to meet SHQS and improve compliance rates relating to EESSH2 and Net
Zero requirements. 
3.3 Meet the aspirations of tenants, families, and carers of residents of sheltered housing
complexes. 
4. Supporting documentation  
4.1 Appendix 1 – 2025/26 HRA Capital Programme 
Stephen Llewellyn
Chief Officer, Housing 
Page 99 of 198

Page 100

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐x No ☐ 
If yes, please provide a brief summary of the impact? 
It is anticipated that along with other proposed works that the programme will help
alleviate fuel poverty and provide warmer more affordable homes for our residents. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No x
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes x No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes x No ☐ 
If Yes, please provide a brief summary of the impact? 
Finance have been involved in the development of the information contained within
this report. 
Provision for the anticipated programme is noted within the 2025/26 Revenue
estimates process with the detailed programme included in Appendix 1. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No x 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No x 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No x 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Page 100 of 198

Page 101

Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes x No ☐ 
If Yes, please provide a brief summary of the impact? 
The replacement of the current Housing Services Management System (HSMS)
which is currently planned for implementation starting during the financial year
2024/25 and will continue in 2025/26. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes x No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes x No ☐ 
If Yes, please provide a brief summary of the impact? 
The contracts awarded to deliver the HRA capital programme will assist in
promoting health and wellbeing of residents within North Lanarkshire as well as
helping reduce our carbon footprint and meet carbon management targets.
Contractors will adopt environmental and sustainability measures and ensure
environmentally friendly recycling practices are evidenced. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes x No ☐ 
If Yes, please provide a brief summary of the impact? 
Engagement with corporate communications will commence on approval of the
proposed plan and an agreed communication plan will be developed as appropriate
for each activity/ programme area. 
5.9 Risk impact 
Is there a risk impact? 
Yes x No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Risk will be minimised and managed by designated Contract Administrators and
Managers in accordance with the works specification and the Council’s agreed
approach to Contract and Supplier Management. High level risk reviews and risk
logs will be recorded as part of the project management process. 
Page 101 of 198

Page 102

5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No X 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No X 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 102 of 198

Page 103

2025/26 HRA Capital Programme  APPENDIX 1 
Programmes   TOTAL
Estate Regeneration    
Estate Regeneration Sub TOTAL £500,000      
Energy Efficiency    
Heating   £10,557,921
Windows & Doors   £9,062,776
Decarbonisation funding    £8,543,554  
Sub TOTAL £28,164,251      
Major Repairs     
Major repairs   £2,642,959
Roofing/Rendering   £19,168,857  
Sub TOTAL £21,811,816      
Home safety and security     
Lead Pipe replacement   £105,997
Door entry replacement   £1,059,974
Electrical work   £1,589,961  
Sub TOTAL £2,755,932      
Internal upgrading     
Kitchens   £6,344,080
Bathrooms   £4,058,024  
Sub TOTAL £10,402,105      
Tower strategy    
Tower Strategy   £3,928,263
Demolition   £13,296,770  
Sub TOTAL £17,225,033      
Community Care    
Community Care Sub TOTAL £3,158,722      
Fees/miscellaneous    
Fees/miscellaneous Sub TOTAL £6,598,136      
GRAND TOTAL   £90,615,995 
Page 103 of 198

Page 104

Page 104 of 198

Page 105

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/VR Date 12/02/25 
HRA Capital Monitoring Report – 1 April 2024 to 6 December 2024 
From  Andrew McPherson, Depute Chief Executive  
E-mail Telferg@northlan.gov.uk Telephone
Greg Telfer, Business
Finance Manager, 01698
302836 
Executive Summary 
The purpose of this report is to review progress towards the agreed spending plans within
the 2024/25 HRA capital programmes. 
The Strategic Capital Delivery Group approved a reprofiling request on the 24 October
2024 which re-aligned planned spend of £4.000m to the 2025/26 financial year. Following
this, the Mainstream programme spend is projected on target. 
The New Supply programme is projecting an underspend of £1.182m due to lower than
anticipated land costs as a result of a higher level of abnormalities being identified. There
is also slight acceleration to the receipt of grant income resulting in a reduced borrowing
requirement of £1.284m. 
Budget was allocated to allow the acquisition of 10 properties within the Mortgage to Rent
(MTR) programme. It is now anticipated that 8 properties will be acquired throughout
2024/25, resulting in an underspend of £0.120m. An over recovery of income of £0.033m
is being projected resulting in a reduced borrowing requirement of £0.153m. The Buy Back
scheme is projecting on target and is expected to acquire 100 properties during the 2024/25
financial year. This is a demand led programme and will continue to be closely monitored. 
Recommendations
It is recommended that the Housing Committee: 
(1) Acknowledges the financial position of the 2024/25 HRA Capital Programmes.   
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning 
Programme of Work  Statutory / corporate / service requirement
Item 7
Page 105 of 198

Page 106

1. Background 
Mainstream Working Programme 
1.1 The Housing Committee on the 14th of February 2024 approved an outline mainstream
programme for 2024/25 based on targeted expenditure of £73.825m including slippage
of £6.711m. Following approval by the Strategic Capital Delivery Group on 24 October,
the Mainstream capital programme has been revised to realign £4.000m to future
years.  The revised programme of £63.114m will be funded as follows: 
£000
Prudential Borrowing   47,695
Capital Funded from Current Revenue (CFCR)  15,419  
Total revised projected resources required  63,114 
New Build Programme 
1.2 The 2024/25 working programme for new build is £34.541m, with 281 completions
expected for the year and is funded as follows: 
£000
Prudential Borrowing 19,925
Capital Funded from Current Revenue (CFCR)   4,670
Scottish Government Grant 10,946
Total projected resources 35,541 
Council Buy Back Schemes 
1.3 As part of the 2024/25 Revenue Estimates, the budget provided for the continuation of
both the Council’s Empty Homes Purchase Scheme (EHPS) and the Open Market
Purchase Scheme (OMPS). This will allow approximately 100 properties to be brought
back into Council use.   
1.4 In addition to the EHPS and OMPS, the Mortgage to Rent scheme (MTR) was also
added to the overall Council Buy Back scheme and is anticipating an additional 10
properties to be brought back into council use in 2024/25. 
1.5 Funding requirements for 2024/25 for the Council Buy Back Scheme is made up as
follows: 
£000
Prudential Borrowing 8,130
Scottish Government Grant
Subsidy Income
4,000    
506
Total projected resources 12,636   
Page 106 of 198

Page 107

2. Report 
2.1  The projected financial performance of the HRA Capital Programmes to 31 March 2025
is summarised below with further detail provided in appendix 1 for HRA mainstream
programme and appendix 2 for the newbuild and buy back programmes. 
Mainstream 
2.2 Following an assessment of projected spend requirements for 2024/25 during a mid-
year budgetary review, a reprofiling request across a number of projects totalling
£4.000m was approved at the Strategic Capital Delivery Group. The target spend for
the 2024/25 financial year has therefore been revised from £67.114m to £63.114m. 
2.3 As at Period 10, £63.011m (99% of the working capital programme) has been legally
committed with £40.597m spent (64% of the working capital programme). The
programme is projecting a full spend for this financial year.
New Build 
2.4 A summary of projected outturn spend on the new build programme is illustrated within 
Appendix 2. The New Build programme is projected to underspend by £1.182m. As at 
period  10, £34.359m is legally committed (97% of the targeted spend) with 
£24.032m spent (68%).  
2.5 There are currently three projects on site at Brandon Street, Motherwell;  Northburn 
Avenue Shop, Airdrie (Conversion); and Thorn Road, Bellshill. 
2.6 Completion of the first 18 homes at Brandon Street, Motherwell, took place 
during the period.   
2.7 Following a procurement exercise through the SPA framework, the main works 
contract for Laburnum Road, Viewpark, was awarded during the period.  
2.8 To date, 1,599 new build homes have been completed as part of the Council’s 
ambitious new supply programme of 5,000 new homes. Currently, 59 homes are 
under construction, with a total of 281 homes expected to complete during 
2024/25, against a target of 268 homes.  
2.9 Sites have been identified and approved at Committee for a further 1,124 homes 
across 32 sites, with site investigations, title checks and design development on 
these sites progressing.  
2.10 The Council has appointed contractors and consultants who are progressing layouts
and designs for several sites, with site investigations underway.  
Council Buy Back Scheme  
2.11 A summary of projected outturn spend on the Council Buy Back Schemes is also
contained within Appendix 2. Projected spend currently totals £12.516m collectively
between the Council buy back schemes, £11.791m is attributable to the Empty Homes
Purchase Scheme (EHPS) and Open Market Purchase Scheme (OMPS) and £0.725m
Page 107 of 198

Page 108

to the MTR scheme resulting in an underspend of £0.120m. This is funded by Prudential
Borrowing, Scottish Government Funding and Subsidy Income.   
2.12 An over recovery of income of £0.033m is being projected within the MTR scheme
resulting in a reduction to borrowing of £0.153m. 
2.13 To date, 62 properties have been brought back into use as affordable housing in  
2024/25, with 100 properties expected to be acquired during this financial year. This is
a demand led programme and risk of anticipated changes to acquisition volumes will
continue to be monitored closely. 
2.14 Following the allocation of additional funding to North Lanarkshire, a Scottish 
Government grant contribution of £3.194m has been secured for 2024/25. Further 
funding may become available in 2024/25, dependent on progress with the wider 
North Lanarkshire ‘Affordable Housing Supply Programme’ resource allocation. 
3. Measures of success 
3.1  The successful delivery of the HRA capital programmes, providing high quality housing
stock. 
4. Supporting documentation 
4.1 Appendix 1 – 2024/25 HRA Capital Programme – Mainstream Budget Monitoring
Period 10 
Appendix 2 – 2024/25 HRA Capital Programme – New Build / Council Buy Back
Scheme Budget Monitoring Period 10 
Andrew McPherson
Depute Chief Executive 
Page 108 of 198

Page 109

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Financial impacts are outlined throughout the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)?  Page 109 of 198

Page 110

Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All activities undertaken by the Council are subject to risk, and in acknowledging
the Council’s approved Risk Management Strategy, Services managed these as
part of their overall corporate and service planning processes. The current
economic climate, in particular, has the potential to impact upon the Council’s
ability to provide quality services within the approved budget levels.
To reduce other financial risks, this report was prepared by service based Finance
personnel in consultation with budget managers, in accordance with the Financial
Regulations
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 110 of 198

Page 111

Appendix 1 
Page 111 of 198

Page 112

Appendix 2 
Page 112 of 198

Page 113

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/JM Date 12/02/25 
Enterprise and Communities – Capital Monitoring Report 
From  Andrew McPherson, Depute Chief Executive  
E-mail telferg@northlan.gov.uk Telephone
Greg Telfer, Business
Finance Manager, 07583
010692 
Executive Summary 
This report highlights the financial performance of 2024/25 Enterprise and Communities
capital programme for the period ended 3 January 2025 (Period 10). 
In summary, the Service has a total capital budget of £130.406m.  At this stage in the
financial year the Service expects expenditure to be £13.467m lower than current
programme which is largely as a result of the changing profile of project expenditure. The
variance will be carried forward into the 2025/26 financial year to support the completion
of works. 
Further explanation of project variances and management action taken by the Service is
included within the main report and attached appendices.
Recommendations
It is recommended that the Committee: 
(1) Acknowledges the financial position of the 2024/25 Enterprise and Communities
capital programme.  
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 8
Page 113 of 198

Page 114

1. Background 
1.1 Financial year 2024/25 is the first year of the 5 year capital programme which was
approved by the Policy and Strategy Committee on 14 March 2024.   
1.2 The Enterprise and Communities 2024/25 capital programme of £112.803m was
approved by the Policy and Strategy Committee on 14 March 2024. The programme
has since been increased by £15.765m relating to carry forwards from 2023/24 and
increased external funding £8.946m. Reprofiling of £1.539m to future years and
acceleration of £0.458m from future years was approved at the Council’s Strategic
Capital Delivery Group (SCDG) in June 2024.  In addition, the October SCDG approved
the reprofiling of £6.027m from the 2024/25 City Deal budget, resulting in a revised
working capital budget for Enterprise and Communities of £130.406m. 
1.3 The Council’s approved Financial Regulations requires services to remain within their
approved budgetary provision, and to report all significant deviations – defined as the
higher of £0.100m or 5% - within their budget monitoring reports.  Where significant
deviations were identified, services must provide explanatory commentary, outline the
action required to rectify such deviations and where relevant, must also highlight the
impact this has on other budget headings. 
2. Report 
2.1 At this stage in the financial year the Service expects expenditure to be £13.467m lower
than current programme.  Given delivery challenges in the capital programme, the
Service continues to review the potential to accelerate the profile of already planned
works and will report this in future reports.  Capital budgets and expenditure are
summarised into Project/Themes (see Appendix 1). 
Assets and Procurement (£3.872m less than budget) 
2.2 Within Assets and Procurement, works have been accelerated within the Office
Accommodation Theme (£1.606m) to support the needs of services.  There are
emerging issues within the Time Capsule’s water sports facility and lifts maintenance
requirements which have resulted in forecast additional costs of £0.633m this financial
year.  The Service is working with the contractor to mobilise the works.  This
acceleration was approved at the SCDG in October 2024. 
There have also been cost increases experienced on a major rewire project within
Maintaining Existing assets (£0.963m) mainly linked to additional asbestos removal
works.  This has been offset by an underspend on roofing works and the reprofiling of
the timing of other works into next financial year. 
Within Sustainable Estates there has been additional unforeseen drainage works
required for two modular accommodation projects resulting in increased costs of
£0.291m.  There have also been increased costs experienced to finalise the Heathery
Park nursey project (£0.201m).  The Service will manage these increased budget
requirements through their overall 5 year allocation. 
Within the ASN theme there is an in year variance of £0.819m this financial year linked
to Carnbroe project and the Edward Lawson centre project which are now planned to
complete in 2025/26. 
Within the Town and Community Hub Theme there is an in year variance of £5.847m
which is mainly in relation to the St Kevin’s Community Hub project (5.052m) due to a
Page 114 of 198

Page 115

timing delay in financial close as a result of pollution control issues which have now
been resolved.  In addition, there is a variance of £0.700m in relation to the Grass Pitch
at Gartcosh where there is a delay with Scottish Power completing work to move a sub
station to allow the pitch works to take place. 
Outdoor Education is also reporting an in year variance of £0.262m linked to the three
pitch replacements where the contractor is on site however it is anticipate work will now
span into April 2025.   
Community Operations (£6.536m less than budget) 
2.3 Within Community Operations the Service is undertaking an ongoing review of the
Council’s vehicle requirements including the timing of delivery of new vehicles. As a
result, an in year variance of £4.551m is projected.  The Service is actively considering
other purchases that can be ordered and delivered this financial year in order to reduce
the reliance on external hires.   
Due to the delay in commencing the new Roads and Infrastructure contract an
underspend of £1.260m is currently anticipated for the LED Infrastructure project. 
Engagement with the new Roads and Infrastructure provider is ongoing to establish
delivery timescales. 
Programme delivery schedules have now been received from the appointed contractor
at Pather Farm Cemetery which has highlighted works will continue into 2025/26.  As
a result of the current year underspend works will be taken forward at Cambusnethan
Cemetery this financial year. 
Within the Parks Masterplan theme there is an in year variance of £0.235m in relation
to Bothwell Haugh Cottage works where there has been a delay in the design stage
therefore this will no span into 2025/26. 
Place (£3.059m less than budget) 
2.4 It is anticipated that Economic Regeneration will see an increase in costs of £0.274m
related to the Braidhurst Industrial Estate however external funding is currently being
sought to offset this.  In addition, there is a further £0.100m increased costs for Town
Centre Fund however there are funds are being held in future years to cover this.  An
underspend in the current year of £3.093m is anticipated for City Deal projects due to
payment for public utilities work now not due until early in the new financial year.   
Infrastructure & Transportation are reporting an underspend of £0.340m.  This is a
result of the delay in the Roads and Infrastructure contract being awarded which has
meant that some works will not be complete until early 2025/26. 
2.5 It is also worth noting that with continuing increases in the cost of delivering capital
programmes all service areas continue to face significant challenges managing the
delivery of capital programmes within the available envelope of resources. The Service
will continue to seek to manage within existing resources. 
3. Measures of success 
3.1  The Service aim is to be in a balanced budget position at financial year-end and will
take current reprofile requests to Committee.   
Page 115 of 198

Page 116

4. Supporting documentation 
4.1 Appendix 1 Summary Expenditure by Project/Theme 
Andrew McPherson
Depute Chief Executive 
Page 116 of 198

Page 117

5. Impacts
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Service aims to operate within approved funding levels and utilise budget
virements to support emerging issues and mitigate variances across budget heads. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Page 117 of 198

Page 118

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All activities undertaken by the Council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy, Services managed these as part of
their overall corporate and service planning processes.  The current economic
climate, in particular, has the potential to impact upon the Council’s ability to provide
quality services within approved budget levels. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 118 of 198

Page 119

Appendix 1
Enterprise & Communities Capital Programme 2024/25
Theme Expenditure Summary
1st April 2024 - 3rd January 2024 (PERIOD 10)
Lvl 8 Thematic Category
Revised
Budget
£
Actual
£
Committed
£
Uncommitted
£
Projected
Outturn
£
Outturn
variance
£
CXA1 ASSET & PROCUREMENT
CXA1A Maintaining Existing Assets - windows, re-
roofing, re-wiring and condition survey
works for the Council's building assets
5,624,977 4,777,956 6,281,331 326,092 6,607,422 (982,445)
CXA1B Carbon Management 1,864,017 178,042 1,601,354 262,663 1,864,017 0
CXA1C Office Accommodation 937,312 2,100,211 2,362,857 180,000 2,542,857 (1,605,545)
CXA1H Health & Wellbeing & Digital Classrooms 154,494 104,435 150,000 0 150,000 4,494
CXA1I Rationalisation including ASN & Social
Work
4,662,868 1,662,486 2,474,483 1,369,399 3,843,882 818,986
CXA1J Curriculum Development 462,684 286,950 286,950 206,315 493,265 (30,581)
CXA1K Sustainable Estate 1,356,117 1,357,927 1,572,652 0 1,572,652 (216,535)
CXA1L Outdoor Education and Outdoor Spaces 3,426,060 930,740 3,188,273 0 3,188,273 237,787
CXA1F Future Capital Receipts Investments 531,729 371,030 503,670 0 503,670 28,059
CXA1M Design Fees 1,699,987 1,299,143 1,688,886 0 1,688,886 11,101
CXA1N 1140 Early Learning and Childcare
Expansion
818,640 666,955 869,965 150,000 1,019,965 (201,325)
CXA1P Water Quality 92,496 64,444 77,451 15,045 92,496 0
CXA1E Demolitions 413,001 313,721 401,288 50,938 452,227 (39,226)
TOTAL ASSET & PROCUREMENT 22,044,382 14,114,042 21,459,160 2,560,452 24,019,612 (1,975,230)
CXA2 TOWN AND COMMUNITY HUBS
CXA2A Town and Community Hubs 43,573,724 25,045,323 35,449,682 2,276,615 37,726,297 5,847,427
TOTAL TOWN AND COMMUNITY HUBS 43,573,724 25,045,323 35,449,682 2,276,615 37,726,297 5,847,427
COMMUNITY OPERATIONS
CXC8 Operational and Infrastructure
Development
13,408,968 5,483,271 7,849,053 1,326,334 9,175,387 4,233,581
CXC6A Greenspace  and Cemeteries 5,175,045 1,620,879 3,610,843 895,734 4,506,578 668,467
CXC4A Greenspace Climate Resilience and
Wellbeing
1,022,082 482,095 647,735 529,784 1,177,519 (155,437)
CXC5A Parks Master Plan (including Strathclyde
Park Watersports Centre Redevelopment)
1,125,527 403,923 759,255 50,000 809,255 316,272
CXC7A Roads and Street Lighting/Asset Mgt 12,786,575 4,874,810 9,981,120 1,432,178 11,413,298 1,373,277
CXC2A Contaminated Land and Resilience 581,223 266,477 309,451 171,772 481,223 100,000
TOTAL COMMUNITY OPERATIONS 34,099,420 13,131,455 23,157,458 4,405,803 27,563,260 6,536,160
PLACE
CXB2B Economic Regeneration 9,203,842 6,080,372 7,004,560 2,573,743 9,578,303 (374,461)
CXB3A City Deal 9,289,253 4,766,202 5,815,673 380,292 6,195,965 3,093,288
CXB3B Enterprise Projects 1,837,827 557,263 887,579 950,248 1,837,827 0
CXB1A Infrastructure & Transportation
Improvements
10,357,852 4,440,166 9,110,750 907,295 10,018,045 339,807
TOTAL PLACE 30,688,774 15,844,004 22,818,561 4,811,578 27,630,140 3,058,634
TOTAL ENTERPRISE &
COMMUNITIES
130,406,300 68,134,823 102,884,861 14,054,448 116,939,309 13,466,991
YTD OUTTURN
Page 119 of 198

Page 120

Page 120 of 198

Page 121

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref  GT/JMcG Date 12/02/25 
Revenue Monitoring Report – Enterprise and Communities 
From  Andrew McPherson, Depute Chief Executive  
E-mail telferg@northlan.gov.uk Telephone
Greg Telfer, Business
Finance Manager, 07583
010692 
1. Background 
1.1 The Council’s approved Financial Regulations require services to remain within their
approved budgetary provision, and to report all significant deviations – defined as the
higher of £100,000 or 5% - within their budget monitoring reports. Where significant
deviations are identified, services must provide explanatory commentary, outline the
action required to rectify such deviations and where relevant, must also highlight the
impact this has on other budget headings. 
Executive Summary 
This report provides a summary of the financial performance of the Enterprise and
Communities service for the period 1 April 2024 to 3rd January 2025 (Period 10) and
illustrates the provisional outturn as at 31 March 2025.  Major outturn variances are
highlighted and explained as per the Council’s approved Financial Regulations. 
In summary, the Enterprise and Communities service is currently forecasting a break-even
position at this stage in the financial year. 
Recommendations 
It is recommended that Committee: 
(1) Acknowledges the financial position of the 2024/25 Enterprise and Communities
revenue budget.  
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Item 9
Page 121 of 198

Page 122

2. Report 
Summary of Financial Position 
2.1 The Council approved its General Fund Revenue Budget on 15 February 2024, of
which £201.899m (19.86%) represented the approved Net Revenue Budget for
Enterprise and Communities.  This budget has since been increased by £5.059m for
the 2024/25 pay award and a further £0.023m to reflect additional budget support for
Rapid Rehousing.  In addition, the budget now also reflects a realignment of ASN bus
route budgets transferred to Education, Children and Families of £0.558m. The
combination of these results in a revised budget of £206.423m for the Service. 
2.1.1 Enterprise and Communities is currently forecasting a break-even position. 
2.1.2 Section 2.2 provides commentary on the financial performance of the Service per
division.  In addition, Appendices 1 to 5 of this report provide further explanation of the
significant budget variations contributing to this outturn position. 
2.1.3 The 2024/25 Enterprise and Communities budget incorporates £5.044m of savings.  Of
this, £2.744m relates to service specific savings with £2.0944m of savings (76%)
forecast to be delivered within the current financial year. Further information regarding
particularly challenging savings is noted in paragraph 2.4 below.  The full £2.300m
historic underspend savings target has now been achieved.   
Analysis of Significant Variations 
2.2 The Enterprise and Communities service is currently forecasting a break-even position
for this financial year.  As at Period 10, there are a number of compensating variances
across the divisions and these are further explained below:   
2.2.1 Assets and Procurement (£0.159m higher than budget) 
Asset Management is projecting additional property and supplies costs of £0.363m
higher than budget due to a timing delay in Office Rationalisation.  There are other
compensating variances due to key net employee vacancies (£0.488m) and additional
rental income of £0.310m offset by use of external advisors (£0.594m) as a result of
difficulties in filling vacancies. 
2.2.2 Community Operations (£1.278m higher than budget) 
The Active and Creative Communities function is projected to outturn £1.185m higher
than budget.  This is largely attributable to lower than budgeted Active NL membership
income (£0.522m), net venue ticket sales (£0.370m) and pay as you go income
(£0.303m).  In addition, the service is currently experiencing additional cost pressures
linked to increased property costs including utilities (£0.316m).  These are partially
offset by one-off grant income (£0.177m) and rental income (£0.150m). 
Land Management and Waste Solutions anticipate an underspend of £1.342m. This is
attributable to underspends in Employee Costs within Land (£0.878m), mainly from
vacancies, partially offset by increased overtime costs of £0.529m. Over-recoveries of
income from recyclable materials in Waste (£0.170m) are partially offset by an
Page 122 of 198

Page 123

expected under-recovery of Special Uplift income (£0.105m) through reduced demand
for the service and other minor variances. 
An overspend of £0.204m is anticipated within Protective Services, largely through
increasing Pest Control sub-contractor costs and Public Analyst fees (£0.124m), from
increased number of pest control cases. Minor vacancy savings are mostly offset by a
minor under-recovery of Pest Control income. Building control fee income is also
projecting to be under recovered by £0.229m. 
Within Fleet, expected additional external hire costs (£0.886m) and outsourcing of
larger vehicle servicing costs (£0.359m) as a result of difficulties in recruiting mechanics
are largely offset by an ear-marked reserve. Net employee savings (£0.782m), mainly
from mechanic vacancies, are largely offset by overspends forecast against vehicle
parts and materials (£0.342m) and increased tyres (£0.119m). The service is currently
reviewing the vehicle requirements across the Council to reduce the external hires
where possible.  
Roads and Transportation has a projected overspend of £0.480m.  Within this
projection there are increased costs (£1.000m) which have still to be finalised in relation
to the previous road contract and disaggregation of the work in progress.  This
overspend is partly offset by savings in street lighting electricity costs because of prior
year investment in LED replacement programme (£0.200m); employee costs vacancies
(£0.086m); reduced upkeep of grounds costs (£0.082m) and a small over recovery of
income (£0.068m). 
Within Facility Support Services an underspend of £0.574m is projected. This is due to
the grant for Free School Meals received in advance of need (£1.000m) and additional
school catering paid meal income (£0.251m) which are partially offset by additional
food costs (£0.279m). 
2.2.3 Place (£0.817m underspend)
An underspend of £0.817m is currently projected within Place, largely as a result of net
vacancies throughout the division (£1.240m).  This is partially offset by an overspend
within Administration Costs of £0.121m relating to increased consultancy and staff
training costs in addition to an overspend within Other Costs for external company
payments (£0.189m) and other minor overspends across the other expenditure
headings.  
2.2.4 Housing Management (£1.065m underspend)
It is anticipated that the Housing Management division will underspend by £1.065m this
financial year. This is due to net vacancies across the service of £0.342m and an
underspend within business development (£0.100m). Homeless rents are showing an
income over recovery of £1.000m. Although there have been increased homeless
presentations, the service has been able to recover a greater proportion of costs
through Housing Benefits. These underspends are partially offset by additional costs
associated with the maintenance of stair and close lighting (£0.222m). 
2.2.5 Included within the reported outturn is the Council’s trading services which has an
approved 2024/25 budgeted surplus of £0.462m. The Council has a statutory
requirement to at least break-even over a rolling three year period with the latest
position being a combined surplus of £0.274m for the period covering 2021/22 to
2023/24. As at Period 10, the Trading Accounts are projecting a surplus of £0.018m for
Page 123 of 198

Page 124

this financial year, which is £0.444m less than budget.  This reduced surplus is in
relation to the Trade Waste activity where there has been a reduction in customer
demand and also the impact of the recent wage award increasing costs.  The Service
is continuing to review this service and will provide updates in future reports. 
2.2.6 Payments to other bodies are detailed in Appendix 3. This expenditure category has a
total budget of £20.180m and is currently projected to be overspent by £2.174m.  The
projected overspend primarily relates to increased costs associated with the finalisation
of the previous roads contract along with the mobilisation of the new contract
(£1.296m).  In addition there are increased agency and sub-contractor costs (£0.741m)
mainly within  Assets and Procurement and Community Operations due to the level of
current vacancies while increased sub-contractor costs in Protective Services come as
a result of increased pest control cases. 
Earmarked and One-off Reserves 
2.3 Enterprise and Communities was given approval to earmark £18.255m of resources
during the completion of the 2023/24 annual accounts. At Period 10, £14.102m of the
reserve balance will be utilised in 2024/25, with a balance of £4.148m required for the
original purpose in future years.  The remaining £0.005m will no longer be required. 
Appendix 4 details the individual Earmarked Reserves. 
2024/25 Budget Savings 
2.4 The Service uses a variety of information, records and processes to monitor
achievement of its approved budget savings of £5.044m. As at Period 10, £4.934m
(87.12%) of its approved savings are forecast to be achievable during the year. The
gap of £0.649m represents a timing delay in office rationalisation (£0.504m) and the
introduction of tachograph fleet income (£0.050m) – both of which have been offset this
financial year by an earmarked reserve. The remainder is for a delay in a staffing related
saving within Business Intelligence (£0.061m) and delays in implementing charges for
recycling bins (£0.035m) which will be offset by in year vacancy savings. 
Management Actions 
2.6 The Service continues to take a range of corrective management actions to ensure it
manages cost pressures. This includes curtailment of non-essential spend and
monitoring of vacancies. 
Change Management 
2.7 The Service forecast to utilise £0.092m of the Council’s Change Management Fund
mainly to support the litter bin strategy. A procurement exercise is currently underway
and spend is fully expected this financial year.  Costs within the Change Management
Fund are not included in the Service outturn position. 
3. Measures of success 
3.1  The Service continues to operate within the approved budget resources   
4. Supporting documentation 
Appendix 1  Objective Analysis 
Appendix 2  Subjective Analysis 
Appendix 3  Payments to Other Bodies Analysis
Page 124 of 198

Page 125

Appendix 4  Status of Earmarked Reserves 
Appendix 5  Challenging Savings   
Andrew McPherson
Depute Chief Executive 
Page 125 of 198

Page 126

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Service continues to curtail non-essential expenditure and take management
action to minimise the impact of cost pressures on the Council’s overall financial
position.  
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐   
Page 126 of 198

Page 127

5.6  Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All activities undertaken by the Council are subject to risk, and in acknowledging
the Council’s approved Risk Management Strategy, Services managed these as
part of their overall corporate and service planning processes. The current
economic climate, in particular, has the potential to impact upon the Council’s
ability to provide quality services within the approved budget levels. 
To reduce other financial risks, this report was prepared by service based Finance
personnel in consultation with budget managers, in accordance with the 
Financial Regulations. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 127 of 198

Page 128

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 128 of 198

Page 129

APPENDIX 1
DIVISION OF SERVICE ANNUAL
BUDGET
PROJECTED
OUT-TURN %
PERIOD
MOVEMENT
SINCE
ANALYSIS
P6
[1] [2] [3] [4] [5] [6] [7]
£ £ £
Assets & Procurement 37,514,575 37,674,038 (159,463) (0.4%) (159,465) Vacancy savings offset by increased external advisor
costs and income from the legacy estate
Community Operations 152,308,248 153,586,540 (1,278,292) (0.8%) (833,137) Under recovery in Leisure membership and Culture
ticket sales and pay as you in go income,
overspends in Fleet due to difficulties in recruitment,
and outsourcing maintenance of larger vehicles as a
result of delays in moving to new depot partially offset
by saving in vacancies and catering grant received in
advance of need and underspend in
consumables/admin as a result of changes in the
disposables require for School Meals, and in street
lighting electricity due to prior years' investment in
LED replacement programme, one off grant income
and also one off rental income
Housing Management 5,753,407 4,688,089 1,065,318 18.5% 971,058 Homeless rent over recovery, net vacancies and
underspend in business development due to delay of
work surrounding homeless prevention.
Place 11,308,514 10,491,993 816,521 7.2% 147,202 Net vacancies partly offset by various minor
underspends
Trading (462,202) (18,120) (444,082) 96.1% (125,659) Under-recovery of trade waste uplift income.
NET EXPENDITURE 206,422,542 206,422,542 0 0.0% 0
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Objective Analysis
Period 10 (01 April 2024 - 03 January 2025)
Enterprise & Communities
PROJECTED OUT-
TURN VARIANCE
Page 129 of 198

Page 130

APPENDIX 2
[1] [2] [3] [5] [6] [7]
£ £ £
EMPLOYEE COSTS 129,855,212 126,164,834 3,690,377 FAV 2.8% 3,690,379 Vacancy savings partly offset by increased overtime
and turnover.
PROPERTY COSTS 58,623,693 58,992,507 (368,814) ADV (0.6%) (368,814) Overspends on utilities, property rates and health &
safety, partly offset by reduced tipping fees.
SUPPLIES & SERVICES 24,429,666 25,526,399 (1,096,733) ADV (4.5%) (1,096,733) Overspend on ICT costs, food provisions and sub-
contracted work partly offset by reduced performing
artist fees.
TRANSPORT & PLANT 6,928,775 7,223,515 (294,740) ADV (4.3%) (294,740) Additional costs of outsourced Fleet work prior to
completion of the new depot facility.
ADMINISTRATION COSTS 16,295,781 15,877,471 418,310 FAV 2.6% 418,310 Grant received in advance of need, partly offset by
increased external advisor costs as a result of
vacancies.
PAYMENTS TO OTHER BODIES 20,180,035 22,353,634 (2,173,599) ADV (10.8%) (2,173,599) See Appendix 3
TRANSFER PAYMENTS 25,122 25,122 0 0.0% 0 Balanced budget.
CAPITAL FINANCING COSTS 60,182,957 60,182,592 365 FAV 0.0% 365 Minor underspend.
OTHER EXPENDITURE 6,484,057 6,540,355 (56,299) ADV (0.9%) (56,299) Overspend on external payments within Business
Growth Fund partly offset by underspend on
miscellaneous costs.
TOTAL EXPENDITURE 323,005,296 322,886,430 118,866 FAV 0.0% 118,869
INCOME 116,582,755 116,463,886 (118,868) AVD (0.1%) (118,868)
Under recovery of active NL membership fees, Net
Culutre ticket sales, pay as you go income within the
Active and Creative Communities.  Offset by £1m
over recovery in homeless income presentations,
one off grant and rental income
NET EXPENDITURE 206,422,542 206,422,542 0 0.0% 0
% ANALYSIS
PERIOD
MOVEMENT
SINCE P6
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Subjective Analysis
Period 10 (01 April 2024 - 03 January 2025)
Enterprise & Communities
CATEGORY ANNUAL
BUDGET
PROJECTED
OUT-TURN
PROJECTED OUT-TURN
VARIANCE
[4]
Page 130 of 198

Page 131

APPENDIX 3
[1] [2] [3] [5] [6] [7]
£ £ £
ROADS MAINTENANCE CONTRACTOR 5,241,413 6,537,721 (1,296,308) ADV (24.7%) (1,296,308) Finalisation of previous Road Contract and Work In
Progress
BUSINESS SUPPORT GRANTS 1,896,978 1,870,586 26,392 FAV 1.4% 19,433 Minor variance.
HOMELESS SUPPORT FEES 1,393,100 1,393,100 0 0.0% 0 Balanced budget.
PAYMENTS TO OTHER BODIES -
GENERAL
2,124,055 2,129,454 (5,399) ADV (0.3%) 106,466 Minor variance.
PAYMENTS TO CONTRACTORS -
ROADS MAINT
8,551,584 8,591,026 (39,442) ADV (0.5%) (1,171) Minor variance.
SUB-CONTRACTOR PAYMENTS 169,495 260,608 (91,113) ADV (53.8%) (4,773) Minor variance.
AGENCY FEES 388,711 1,129,902 (741,191) ADV (190.7%) (502,255) Overspends in Asset Management, Waste and Fleet
to cover current vacancies.
PUBLIC ANALYST FEES 267,000 293,538 (26,538) ADV (9.9%) 0 Minor variance.
PRIVATE SECTOR HOUSING GRANTS 147,699 147,699 0 0.0% 0 Balanced budget.
TOTAL EXPENDITURE 20,180,035 22,353,634 (2,173,599) ADV (10.8%) (1,678,608)
CATEGORY ANNUAL
BUDGET
PROJECTED
OUT-TURN
PROJECTED OUT-
TURN VARIANCE %
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Payments to Other Bodies
Period 10 (01 April 2024 - 03 January 2025)
Enterprise & Communities
ANALYSIS
[4]
PERIOD
MOVEMENT
SINCE P6
Page 131 of 198

Page 132

APPENDIX 4
Period 10 (01 April 2024 - 03 January 2025)
Value %
Dilapidations 588 0 588 268 588 100.0% 0 0 588 Costs associated with leased in property disinvestment
Office Rationalisation 224 0 224 172 224 100.0% 0 0 224 Costs associated with Office closures and new energy mgt system
Local Heat and Energy Efficiency Funding 38 37 75 0 38 50.5% 0 0 38 Consultancy spend for LHEES program
Hybrid Working 60 0 60 60 60 100.0% 0 0 60 Costs associated with returning to office
Mobilisation of Strategic Contracts - Property 1,244 0 1,244 145 1,244 100.0% 0 0 1,244 One off mobilisation costs
Renewables 200 0 200 0 200 100.0% 0 0 200 Maintenance of renewable heating systems
Electrical Testing 600 0 600 0 600 100.0% 0 0 600 Electrical testing programme
Winter Reserve 1,500 0 1,500 0 1,500 100.0% 0 0 1,500 Contingency for significant winter event
Private Sector Grants to Owner Occupiers 148 0 148 11 148 100.0% 0 0 148 Improvement grants
Service Development - Cemeteries Bothies 250 0 250 0 250 100.0% 0 0 250 Funding for works in cemetery bothies; extra cleaning/ waste and plant
hire due to covid.
Bellshill Depot Eco hub 200 0 200 0 0 0.0% 200 0 0 Set up costs for Eco Hub
Service Developments (fleet pressures) 1,041 0 1,041 1,041 1,041 100.0% 0 0 1,041 Contingency for increased fleet pressures - fuel, ext hires, agency staff
and outsourcing
Service Developments - Ash Dieback 896 0 896 0 896 100.0% 0 0 896 Works associated with removing ashdieback
Greenspace Grants 83 190 273 0 83 30.4% 0 0 83 Grant carried forward
Mobilisation of Strategic Contracts - Roads 933 0 933 863 933 100.0% 0 0 933 One off mobilisation costs
Increased Usage of Country Parks 25 0 25 20 20 80.4% 0 5 20 Temporary Staffing costs
Recover NL - Protective Services 49 75 124 23 49 39.3% 0 0 49 Environmental Improvements
Active and Creative Grants 763 0 763 473 634 83.1% 129 0 634 Grant carried forward
Rapid Rehousing 47 586 632 47 47 7.4% 0 0 47 Rapid Rehousing programme to tackle homelessness
Homelessness Surplus 0 995 995 0 0 0.0% 0 0 0 Increases in homelessness presentations
HEEPS 0 591 591 0 0 0.0% 0 0 0 Energy Efficiency Schemes - contributions to current programme
Business Growth 1,121 819 1,940 5 1,121 57.8% 0 0 1,121 Temporary Property costs as a result of capital programme
LACER- Business Growth & Recovery 1,292 0 1,292 0 1,292 100.0% 0 0 1,292 Business Recovery
Shared Prosperity Grant 1,753 0 1,753 1,027 1,753 100.0% 0 0 1,753 Grant carried forward
Cumbernauld Town Centre Project 0 216 216 0 0 0.0% 0 0 0 Cumbernauld Town Centre Funding for future repairs
Levelling Up Grant Coatbridge 50 0 50 50 50 100.0% 0 0 50 Grant carried forward
Smith Stone - Roadworks (former capital receipt) 134 0 134 33 33 24.3% 101 0 33 Roads works linked to former capital receipts
Local Development Plan 77 210 287 0 77 26.8% 0 0 77 Set up cost to produce LDP
Digital 1,222 0 1,222 1,222 1,222 100.0% 0 0 1,222 One off to cover digital balance
Total 14,537 3,718 18,255 5,459 14,102 77% 430 5 14,103
FINANCIAL YEAR - 2024/25
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Status of Earmarked Reserves
Enterprise  & Communities
Reserves
Required In
Year
Commentary Regards UsageDESCRIPTION OF EARMARKED RESOURCE Reserve Allocation
2024/25
Profiled in
Future Years
Approved
Reserve
Total
Spend to
Date
Projected Spend Reprofile to
Future Years
No Longer
Required
Service Specific Earmarked Reserves: £000£000£000£000£000£000£000£000
Page 132 of 198

Page 133

APPENDIX 5
Period 10 (01 April 2024 - 03 January 2025)
£000 £000 £000 £000 £000
Savings 2021/2022 and 2022/23
EC10 Asset Management
Rationalisation/Office Dis-
investment.
Assets &
Procurement
800 296 504 Timing of Office Closures Ear Marked Reserve &
Additional service income
344 160
EC37 Review of staffing within Business
Intelligence and Strategic
Resourcing team
Community
Operations
76 15 61 Delays in staff changes Vacancy savings 61 0
2024/25 Saving 0
72ECSC Charging for Recycling Bins Community
Operations
210 175 35 Delays in implementing charges Vacancy savings 35 0
78ECSB Income Generation - Fleet
Tachograph
Community
Operations
50 0 50 Delays in new Depot opening Ear Marked Reserve 50 0
0
TOTAL 1,136 486 650 490 160
Reasons for Savings Gap
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Challeging Savings
Enterprise & Communities
DESCRIPTION Value Revised
Savings Gap Commentary
Savings
Gap
APPROVED SAVINGS REPLACEMENT SAVING / FUNDING
Ref. DESCRIPTION OF APPROVED
SAVING DIVISION
Target
Value
Value
Deliverable
Page 133 of 198

Page 134

Page 134 of 198

Page 135

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    SL/GT/VR Date 12/02/25 
Revenue Monitoring Report – Housing Revenue Account 
From  Andrew McPherson, Depute Chief Executive  
E-mail telferg@northlan.gov.uk Telephone
Greg Telfer, Business
Finance Manager, 07586
010692 
1. Background 
1.1 The Council approved its Housing Revenue Account budget of £174m on 21 December
2023. 
1.2 The Financial Regulations require Services to remain within their approved budgetary
provision, and to report all significant deviations – defined as the higher of £100,000 or
Executive Summary
This report provides a summary of the Housing Revenue Account financial performance
for the period 1 April 2024 to 3 January 2025 (Period 10). The report illustrates the
provisional outturn as at 31 March 2025, with major outturn variances highlighted and
explained in accordance with the Council’s approved Financial Regulations. 
The Service is currently projecting an underspend of £2.300m for the financial year. 
In setting the 2024/25 budget, savings of £1.165m were approved which have been
incorporated within the budget. It is currently anticipated that these savings will be fully
delivered by the end of the financial year. 
Recommendations
It is recommended that the Housing Committee: 
(1) Acknowledges the financial position of the HRA revenue budget 2024/25. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 10
Page 135 of 198

Page 136

5% - within their budget monitoring reports. Where significant deviations are identified,
Services must provide explanatory commentary outline the action required to rectify
such a deviation, and where relevant, must also highlight the impact this has on other
budget headings. 
2. Report 
2.1 The Service is currently projecting an underspend of £2.300m for the financial year. 
Analysis of Significant Variances 
2.2 The Housing Revenue Account currently anticipates an underspend of £0.300m within
Employee Costs due to increased turnover savings. This position also incorporates the
impact of the 2024/25 pay award uplift. 
2.3 An underspend of £2.930m is currently anticipated within Property costs. As a result of
increased capital investment in our housing stock, the demand for housing repairs has
been lower this financial year, this combined with lower than expected contract inflation
has resulted in an underspend of £2.850m being anticipated.  The Service is aware
and continues to monitor the potential risks to the reported position including the
potential impact of repairs required during the winter months.  The position around
repairs will continue to be closely monitored with updates provided in future reports
where required. In addition, information from the Council’s energy unit suggests that
electricity will underspend by £0.200m this financial year.  These underspends are
partially offset by increased costs in relation to the garden assistance scheme
(£0.120m). 
2.4 An underspend of £0.670m is projected within Administration Costs as a result of lower
than expected future credit losses (£0.500m). Further underspends are projected
across this heading for a combination of areas such as legal and Sheriff Officer fees
(£0.170m). 
2.5 A minor underspend of £0.075m is anticipated within Apportioned Expenses because
of decreased recharges from other Council services. 
2.6 An overspend of £1.500m is anticipated within Other Costs which is relates to an
anticipated increase of awards for Universal Credit Assistance Fund to support tenants
transitioning to Universal Credit from Housing Benefit, which is expected to peak in
March 2025. 
2.7 A small under recovery of £0.175m is anticipated for mainstream rent collection. 
2.8 As part of the approval of the HRA budget for 2025/26, it was agreed that £1.000m of
the current year surplus would be earmarked to help manage the pressures of the
migration to Universal Credit from Employment Support Allowance and Housing Benefit
and to assist with the sustainability of tenancies. This will be actioned as part of the
year end process.   
Risk and Uncertainty  
2.9 Committee will be aware that following the Health and Safety Alert issued by the
council’s corporate health and safety team in connection with Reinforced Autoclaved
Aerated Concrete (RAAC), the Service has been working to identify any presence of
RAAC within our housing stock.  It is anticipated that any remedial action required will
Page 136 of 198

Page 137

result in financial implications. The Service continue to consider these potential costs
as part of the periodic monitoring with the potential to earmark any future surplus funds
to mitigate the impact of RAAC.  This is subject to a separate report within the
Committee agenda and the outcome will be reflected in future monitoring reports. 
Earmarked and One-off Resources 
2.9 HRA reserve balances brought forward from 2023/24 total £16.820m.  This includes a
revised contingency fund balance of £1.742m, representing 1% of the approved
2024/25 HRA budget. In addition, a balance of £5.370m remains from the loan debt
holiday taken in 2022/23 and is earmarked to support the ongoing cost impact of that
policy decision. Finally, a balance of £3.403m is retained for ongoing risks and
uncertainties and to support future budget strategies. It is anticipated that reserves
totalling £1.894m will be utilised during 2024/25 as detailed in Appendix 2.  A review of
reserve balances will be undertaken as part of the year end close down in order to
ensure suitable reserves are maintained. 
2024/25 Budget Savings 
2.10 The service uses a variety of information, records and processes to monitor
achievement of its approved budget savings of £1.165m. It is anticipated that 100%
approved savings will be delivered by the end of the financial year. 
3. Measures of success 
3.1 The Service continues to operate withing approved resources and meet required
savings targets.     
4. Supporting documentation 
4.1 Appendix 1  HRA Summary 
Appendix 2  Earmarked Reserves / Balance Sheet Provisions 
Andrew McPherson
Depute Chief Executive 
Page 137 of 198

Page 138

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The financial impacts are contained within the report and supporting appendices. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Page 138 of 198

Page 139

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All activities undertaken by the council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy, Services manage these as part of
their overall corporate and service planning process. The current economic climate,
in particular, has the potential to impact upon the Council’s ability to provide quality
services within approved budget levels. 
Reflecting the risk analysis matrix included within the Risk Management Strategy,
the Service considers the impact of inflation on key service contracts and the cost of
living crisis presents an ongoing risk to the financial outturn for 2023/24 and this is
an ongoing focus of discussion within the Service and with Finance. 
To minimise risk, this report has been prepared by Finance personnel in
consultation with budget managers, in accordance with the Financial Regulations.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.  
Page 139 of 198

Page 140

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 140 of 198

Page 141

Appendix 1 
FINANCIAL MONITORING REPORT
01 April 2024 to 3 JANUARY 2025 (Period 10)
COMMITTEE:  HOUSING
CATEGORY ANNUAL PROJECTED ANALYSIS
BUDGET OUTTURN %
(1) (5) (6) (8) (9) (10)
£ £
EMPLOYEE COSTS 29,815,170 29,515,170 300,000 FAV 1.0% 300,000 Underspend due to increased turnover savings
PROPERTY COSTS 70,140,870 67,210,870 2,930,000 FAV 4.2% 2,930,000 Underspend mainly due to decreased repair and electricity costs
slightly offset by increased costs to garden assistance and void
rent loss
SUPPLIES & SERVICES 727,970 727,970 0 - 0.0% 0 Balanced budget
TRANSPORT & PLANT 394,350 394,350 0 - 0.0% 0 Balanced budget
ADMINISTRATION COSTS 7,068,150 6,398,150 670,000 FAV 9.5% 670,000 Underspend mainly due to decreased expected future credit
losses in addition to decreased legal and sheriff officer fees
PAYMENTS TO OTHER BODIES 231,120 231,120 0 - 0.0% 0 Balanced budget
APPORTIONED EXPENSES 7,071,310 6,996,310 75,000 FAV 1.1% 75,000 Decreased costs
CAPITAL FINANCING COSTS 37,574,280 37,574,280 0 - 0.0% 0 Balanced Budget
C.F.C.R. 20,089,260 20,089,260 0 - 0.0% 0 Balanced Budget
OTHER COSTS 1,057,010 2,557,010 (1,500,000) ADV (141.9)% (1,500,000) UCAF
TOTAL EXPENDITURE 174,169,490 171,694,490 2,475,000 FAV 1.4% 2,475,000
OTHER GRANTS 0 0 0 - 0.0% 0 Balanced Budget
FEES AND CHARGES 9,287,220 9,287,220 0 - 0.0% 0 Balanced Budget
RENTS 164,344,660 164,169,660 (175,000) ADV (0.1)% (175,000) Under recovery of mainstream rental income
INTEREST 15,000 15,000 0 - 0.0% 0 Balanced Budget
DEPARTMENTAL CHARGES 522,610 522,610 0 - 0.0% 0 Balanced Budget
SURPLUS 0 0 0 - 0.0% 0 Balanced Budget
INCOME 174,169,490 173,994,490 (175,000) ADV (0.1)% (175,000)
NET EXPENDITURE 0 (2,300,000) 2,300,000 FAV 2,300,000
FAV = Favourable variation, underspend etc 362,119            
ADV = Adverse variation, overspend, income under-recovery etc
PROJECTED OUTTURN PERIOD
MOVEMENTVARIANCE
(7)
Page 141 of 198

Page 142

Appendix 2 
DESCRIPTION OF EARMARKED
RESERVES
VALUE OF
EARMARKED
RESERVE
CARRY FORWARD ANALYSIS
VALUE %
(1) (2) (3) (4) (5) (6)
£ £ £
Ambition 1,306,293 0 100.0% 1,306,293 Carry Forward
Additional Loan Charges 3,702,000 176,000 95.2% 3,526,000 Carry Forward
Enterprise Contract 1,078,000 1,078,000 0.0% 0 Budget fully utilised
Rent Restructure 219,000 69,000 68.5% 150,000 Carry Forward
Loan Debt Holiday 5,370,000 571,000 89.4% 4,799,000 Carry Forward
SUB TOTAL 11,675,293 1,894,000 83.8% 9,781,293
Change Management/Risks & Uncertainty 3,403,000 0 0.0% 3,403,000
Core Reserve 1,742,000 0 100.0% 1,742,000
TOTAL 16,820,293 1,894,000 88.7% 14,926,293
PROJECTED OUTTURN
North Lanarkshire Council
Housing Revenue Account - Earmarked Reserves
01 April 2024 to 3 JANUARY 2025 (Period 10)
Page 142 of 198

Page 143

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    SL/GT Date 12/02/25 
Former Tenant Arrears Write Off to 31 March 2023 
From  Stephen Llewellyn, Chief Officer (Housing)  
E-mail TelferG@northlan.gov.uk Telephone
Greg Telfer, Business
Finance Manager, 07583
010692 
Executive Summary
The purpose of this report is to present to Committee a summary of outstanding Housing
Rent debts which are deemed uncollectable following all attempts at recovery by the
Housing Rents and Court teams or are considered uneconomically viable to continue
pursuing. 
In accordance with financial guidelines a provision for expected credit losses has
previously been established for the outstanding accounts highlighted below. 
The debt to be written off relates to former tenancies where the tenancy end date is prior
to 31 March 2023. The total recommended write-off is £3,925,862 which equates to 2.62%
of the total rent income of £149,720,181. 
In addition, following a decision of the Housing Committee in August 2024 to change the
treatment of Universal Credit Assistance Fund awards from a repayable loan to a grant,
the report seeks approval to no longer pursue these loans and write-off these debts as
outlined in paragraphs 2.6 and 2.7. The total recommended for write-off is £3,336,874.09.
This creates no additional financial implications for the Housing Revenue Account because
of the previously established provision for expected credit losses. 
Recommendations
It is recommended that the Housing Committee: 
(1) Acknowledge the decision of the Chief Officer (Housing Management) and the Chief
Officer (Finance) to write off £381,165.92 under delegated responsibilities; 
(2) Approves the write off of £3,544,696.50 which includes individual debts greater than
£500; 
(3) Approves the write off of credit balances that have arisen in some former tenancy rent
accounts, totalling £50,914.31; 
(4) Approve the write off of pre August 2024 Universal Credit Assistance Fund awards
where debt is greater than £500 of £320,716.33;
(5) Acknowledge the write off of Universal Credit Assistance Fund awards where debt is
less than £500 to the value of £3,016,157.76;
(6) Remit this report to the Finance and Resources Committee. 
Item 11
Page 143 of 198

Page 144

1. Background 
1.1 The Housing Service has an average annual turnover in tenancies of approximately
3,000 with tenancies terminating for a variety of reasons. 
1.2 The Service has a full rent arrears process in place which ranges from reminder letters
at the early stages through to the pursuit of arrears via the courts. The arrears process
actively pursues debt in both current tenancies and former tenancies and only ever seeks
to write-off debt relating to former tenancies once all avenues of recovery have been
exhausted. 
1.3 A wide range of payment methods are available to tenants to enable them to make
payments towards their rents in a timely and consistent manner that suits their
circumstances. These range from Direct Debits, Online Payment facility, Standing
Orders, Post Office, Paypoint and deductions from wages. 
1.4 Early intervention and engagement with current tenants who fall into arrears is a key part
of the process to minimise the debt level that exists when tenancies terminate. However,
despite the steps in place, there are a number of debts that are deemed uncollectible or
are considered not economically viable to engage further collection activities and costs.
This annual process of assessing the likelihood of debt non-recovery follows accepted
best accounting practice and is a realistic assessment of expected outcome. 
1.5 The Annual Return on the Charter for 2023/24 published by Scotland’s Housing Network
identifies that former tenant arrears have increased across the whole sector from 1.86%
in 2020/21 to 2.47% in 2023/24.  In addition, the Council’s collection rate for rent due in
2023/24 was 99.3% which mirrors the Scottish Local Authority Average for the same
year. 
1.6 It should be noted that the Council moved onto full Universal Credit status in April 2018
and as a result, has since seen an increase in current tenant arrears. This is likely to
have an adverse impact on the future levels of former tenant arrears that will be sought
for write off. A full Income Maximisation Service is offered to all tenants to try and mitigate
the impact of welfare reform. 
2. Report 
2.1 An exercise has been undertaken to identify debt that is now considered to be non-
collectable. In accordance with financial guidelines a provision for expected credit losses
has previously been established for the outstanding accounts. 
The Plan for North Lanarkshire
Priority  Enhance participation, capacity, and empowerment across our
communities
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work Statutory / corporate / service requirement
Page 144 of 198

Page 145

2.2 There are a number of reasons why the outstanding balances are being written off and
these are summarised below: 
• Liquidation / Sequestration. The debtor has been liquidated / sequestered etc, and
there is no prospect of recovery of funds. 
• Deceased. The debtor is deceased and there have been insufficient funds within the
estate to meet the sum due. 
• Eviction / Abandonment / No Forwarding Address. The debtor has been unable
to be located following eviction or abandonment of their tenancy or have left no
forwarding address and there is no prospect of recovery of funds. 
• Recovery exhausted. All avenues of recovery have now been exhausted via our
internal processes and via the courts.  The decision has been taken not to pursue
any further.  Recovery is considered not possible. 
2.3 The following tables categorise the value of debt recommended for write-off by cause
and value: 
2.4 The write off being proposed to 31 March 2023 represents 2.62% of the total rental
income of £149,720,181. The following table outlines the value of the annual former
tenant arrears write-off over the previous 5 years: 
2.5 The Council will continues to seek collection of any outstanding balances if the
circumstances of the debtor change and recovery is deemed practical.
Cause Analysis
Write off Value No. of
Tenancies
Average
Write off
Value
2025
Average
Write off
Value
2024
£ £ £
Abandoned 723,417.29 453 1,596.95 1,191.98
Deceased 346,797.03 585 592.82 473.56
Eviction 210,368.12 52 4,045.54 1,050.12
Liquidations/Sequestration 139,232.17 45 3,094.05 2,550.55
No Forwarding Address 238,181.08 237 1,004.98 853.75
Recovery Exhausted 2,267,866.73 2,490 910.79 728.69
Total Debt 3,925,862.42 3,862 1,016.54 771.13
Credit Balances (50,914.31) 359 (141.82) (35.00)
Value Analysis
< £500 381,165.92 2,334 163.31 166.40
>£500 3,544,696.50 1,528 2,319.83 1,965.90
Total Debt 3,925,862.42 3,862 1,016.54 771.13
Former Tenant Arrears
Written Off to:
Value
£
% of
Income
30 March 2022 2,553,973.58 1.76
31 March 2021 2,610,389.37 1.82
31 March 2020 3,560,465.00 2.57
31 March 2019 3,505,183.00 2.54
31 March 2018 2,408,607.00 2.09
Page 145 of 198

Page 146

Universal Credit Assistance Fund
2.6 Members will be aware that in August 2024 the Housing Committee approved the change
in treatment of Universal Credit Assistance Fund awards from a repayable loan to a
grant. This decision was based on future awards from the fund. A total of £3,336,874.09
remains to be repaid by tenants who accepted the loan arrangement but are unable to
repay.  This covers outstanding awards for both current and former tenants since the
establishment of the UCAF awards until 28 August 2024.   
2.7 As with former tenant arrears, the service has previously fully provided for these debts
within the annual expected credit loss calculation. Therefore, the decision to no longer
pursue and subsequently write-off these debts creates no additional financial burden
on the Housing Revenue Account. 
3. Measures of success 
3.1. The Service continues to engage in several activities aimed at improving collection rates,
reducing debt arising and streamlining the recovery process. The Council will continue
to seek collection of the outstanding balance if the circumstances of the debtor alter, and
recovery is deemed practical. 
4. Supporting documentation 
Not Applicable 
Stephen Llewellyn
Chief Officer (Housing) 
Value Analysis
Write off
Value
No. of
Tenancies
Average
Write off
Value
2025
£ £
< £500 3,016,157.76 7,447 405.02
>£500 320,716.33 595 539.02
Total Debt 3,336,874.09 8,042 414.93
Page 146 of 198

Page 147

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
There are no additional financial implications linked to this report for the current
financial year as a corresponding bad debt provision has been included in the
previous year’s accounts. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 147 of 198

Page 148

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles
from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 148 of 198

Page 149

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref          PH/JS/KS Date 12/02/25 
New Housing Supply Programme – Procurement Update 
From  Pamela Humphries, Chief Officer (Place)  
E-mail stevensonjam@northlan.gov.uk Telephone
James Stevenson,
Housing Development
Manager, 07583098631 
Executive Summary 
The purpose of this report is to update Committee on current procurement activity relating to the
new build housing programme and seek approval to progress procurement arrangements as
outlined in the report. 
Recommendations 
It is recommended that the Housing Committee: 
(1) Approves the award of contracts procured via a “Direct Award” procedure via the Scottish
Procurement Alliance New Build Housing Construction H2 (Scotland) framework agreement
(the “Framework”) for the following site: 
• Newton Drive, Newmains to McTaggart Construction Limited up to the value of
£8.75M, including contingency allowance;
• Coshneuk Road, Millerston to JR Construction (Scotland) Limited up to the revised
value of £4.5m, including contingency allowance. 
(2) Approves the award of a contract procured via Direct Award via the Scotland Excel Building
Construction Consultancy Framework for a Consultancy Engineering Team for the demolition
at the Anvil Block, Main Street, Wishaw up to the value of £300,000.00, including contingency
allowance to G3 Consultant Engineers Ltd; and 
(3) Acknowledges the award of contracts for the following site previously approved at Housing
Committee on 06 November 2024: 
• Laburnum Road, Viewpark awarded to CCG (Scotland) Limited on 18 December 2024
at a value of £6,301,325.01. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth
Item 12
Page 149 of 198

Page 150

1. Background 
1.1 The council has an approved programme to deliver 5,000 new homes by 2035. The
delivery of such a large-scale programme presents several challenges, not least of which
is the procurement of contractors to build the houses to the required standard, within the
timescale required and at a competitive cost. To increase the pace of delivery, secure
best value and minimise risk to the Council, a range of procurement options have been
utilised. 
1.2 To deliver the new build housing programme a range of procurement options are being
utilised. For each project a Contract Strategy is undertaken to assess the most
appropriate procurement route. These include but are not limited to the use of SPA and
Scotland Excel frameworks utilising the direct award and mini comp procedures, and in
some cases the use of Hub South West or a traditional “Restricted” style tendering
procedure within the open market. 
1.3 Within this report, two site locations have been identified to be procured via the Direct
Award procedure. The Direct Award procedure has been identified as the optimum route
to market currently as it allows early engagement with contractors leading to economies
and efficiencies being achieved in design, early engagement for utilities and programme
benefits to be achieved. 
2. Report 
2.1 The council has engaged with McTaggart Construction Limited who are a contractor on
the Framework. Feasibility costs have been obtained for the site at Newton Drive,
Newmains (former St Brigid’s Primary School), (35 units), at the revised value of £8.75M,
including contingency allowance. 
The feasibility costs obtained are considered to represent best value and, subject to
benchmarking against the appropriate framework rates, it is proposed that a final tender
price be agreed to allow the contract award. 
2.2 It is proposed to procure an engineering consultant via direct award from the Scotland
Excel Framework for specialist demolition and project management consultancy services
for the development below: 
• Anvil Block, Main Street, Wishaw to G3 Consultant Engineers Ltd, at the value of
£300,000.00, including contingency allowance. 
The feasibility costs obtained are considered to represent best value and, subject to
benchmarking against the appropriate framework rates, it is proposed that a final tender
price be agreed to allow the contract award. 
2.3 The projects listed above in sections 2.1 – 2.2 are still in live procurement procedures
however are nearing completion. Accordingly, the recommendations listed on page one
of this report are for the approval for the award of each contract (in accordance with the
council’s General Contract Standing Orders) up to the values stated as and when they
are finalised outwith the council’s committee cycle. 
Adopting this approach shall expedite the programme and allow appointed contractors to
progress works in a more efficient and effective manner. Additionally, this approach shall
Programme of Work Transforming Places 
Page 150 of 198

Page 151

also prove beneficial where any pre-construction / enabling works are required whilst also
allowing appointed contractors to engage third party companies i.e. utility companies to
undertake works required to enable housing construction methods to commence. 
Should the recommendations within this report be approved, more detailed information
on any contract awarded for each site shall reported to the next available Housing
Committee following award.     
Should contracts to be awarded exceed the values stated in the recommendations, further
details and approvals shall be sought from a future Housing Committee. 
2.4 The pricing mechanism is a Priced Contract with Activity Schedule offering a good level
of cost certainty. However, there are currently no cashable savings attributed to the
contracts outlined within above within sections 2.1 – 2.2 at this time. 
2.5 The council is committed to maximising the delivery of community benefits. The
procurement includes a community benefit requirement, this approach is designed to
deliver local community benefits where possible. Given the current stage of the
procurement processes for each of the sites listed within this report, there are currently
no Community Benefits identified. However, once contracts have been formally awarded,
an overview of community benefits committed to by contractors will be reported to
Committee. 
2.6 All contractors appointed to the Framework have evidenced fair working practices within
their organisations as part of the procurement procedures to be appointed to the
respective arrangements 
2.7  In addition to the sites listed above in sections 2.1 – 2.2, work has progressed to award
contracts following approval at the Housing Committee on 06 November 2024. 
a. Laburnum Road, Viewpark (26 Units) awarded to CCG (Scotland) Limited on 18
December 2024 at a value of £6,301,325.01 including contingency allowance  
Further information on the contract awarded above can be found within Appendix 1 of this
report.  
2.8 Officers from New Supply will be responsible for managing all contracts once awarded
which will be undertaken in accordance with the council’s agreed approach to contract
and supplier management. 
2.9 In addition to the sites detailed above, the next batch of sites will be identified and
assessed, and a suitable procurement route will be identified to progress these projects
to deliver new build housing to align with the Plan for North Lanarkshire. 
3. Measures of success 
3.1  The proposed contract awards detailed within this report will deliver the following
outcomes: 
a) The appointment of contractors who have the experience and capability to deliver
new build social housing.   
b) The procurement procedures applied are compliant with the procurement
legislation, overarching framework agreements and internal procedures. 
Page 151 of 198

Page 152

c) That best value is both demonstrable and achieved. 
d) That contracts awarded secure a range of community benefits. 
e) Those contracts awarded support payment of the real Living Wage to staff
employed in the delivery of the requirements; and 
f) That the performance of contracts awarded are proactively managed against
several Key Performance Indicators. 
4. Supporting Documents 
4.1 Appendix 1 Summary of Contracts Awarded 
Pamela Humphries
Chief Officer (Place)  
Page 152 of 198

Page 153

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The new build programme includes measures that will help reduce inequalities of
outcome through certain design features including: 
• Housing for Varying Needs to make homes as accessible as possible.
• Secure by Design to make homes and the surrounding environment as safe
and secure as possible.
• Achieving the Scottish Government requirements for Greener Homes to
• reduce the incidence of fuel Poverty.
• Facilitating improved access to high-speed internet capabilities including
installation of ‘fibre to the property’.     
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The funding for projects referred to in this report can be met from the Council’s
Housing Revenue Account budget for the New Supply Programme. Grant support is
also provided by the Scottish Government. The costs associated with contract
delivery will be contained within the HRA New Supply capital programme. Current
forecasts include for grant from the Scottish Government towards the cost of the new
homes which is from a minimum of £83,584 per unit. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☒
Page 153 of 198

Page 154

If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The proposed award of contracts detailed within this report will ensure that the impact
on the Council’s carbon footprint is mitigated. The specifications incorporated within
the contract documentation will: deliver reduced energy need; encourage sustainable
construction; promote health and wellbeing; reduce waste and resources through
effective storage, collection and composting of waste and recyclable materials and;
include measures which will reduce CO2 emissions.
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The implementation and delivery of the New Supply programme will be promoted
through the New Supply PR plan and via communications with elected members and
local stakeholders 
Page 154 of 198

Page 155

5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
Risk associated with the New Supply Programme is managed within the council’s
project management and risk register process. By undertaking detailed Ground
Investigation and other relevant site assessments, prior to proceeding with the
development of any site, the council is mitigating the risk of unforeseen costs relating
to ground conditions, although this risk cannot be eliminated entirely.   
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
The Council’s New Supply housing programme previously partnered with Veterans
Housing Scotland to deliver housing for Armed Forces Veterans and the current
SHIP supports new affordable housing project for Scottish Veterans' Garden City
Association. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles
from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 155 of 198

Page 156

Appendix 1 – Summary of Contracts Awarded 
Contract
Ref NLC-SLP-23-092
Title New Build Social Housing at Laburnum Road, Viewpark
Classification Works  
Competition
Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Mini Competition
No. of Framework Contractors Nine
Comments This contract was procured considering the relevant information technical and commercial proposals from the
Scottish Procurement Alliance H2 New Build Housing framework agreement, Workstream 1. Lot 3 (10 - 30 units)  
Award
Details
Contract Award Date 18 December 2024
Awarded Value £6,301,325.01
Contract Duration 16 Months
Contractor Name CCG Construction Limited
Contractor Size SME
Contractor Location South Lanarkshire
Payment of Living Wage? Yes
Living Wage Accredited? No
Community Benefits Committed
1 x New Job for an Individual from a Priority Group
1 x New Job for an Apprentice from a Priority Group
3 x Work Experience Placement for an individual16+ years of age
4 x Educational Visits
1 x Financial Support for a Community Project / Organisation
2 x Non-financial Support for a Community Project / Organisation 
Page 156 of 198

Page 157

North Lanarkshire Council
Report
Housing Services Committee
Does this report require to be approved? ☒ Yes ☐ No
Ref: SL/KMcG Date: 12 February 2025
Contract Award for Garden Assistance Scheme & Ad-Hoc Garden
Works 2025 - 2028 
From  Stephen Llewellyn, Chief Officer (Housing)
E-mail Llewellyns@northlan.gov.uk Telephone: 01698 274192 /
07939280680
Executive Summary
The Committee is asked to approve the award of a contract for Garden Assistance Scheme & Ad-
Hoc Garden Works 2025 - 2028 (the ‘Agreement’), in five Lots split across specific geographical
areas to: 
Lot 1 - Coatbridge:  Greenerleaf Estate Maintenance Ltd.
Lot 2 – The North:   Caledonian Cleaning Ltd. 
Lot 3 - Airdrie & Cumbernauld: Grass Grow Garden Maintenance Ltd.
Lot 4 - Bellshill: M Squared Scotland Ltd. 
Lot 6 – Wishaw/ Shotts: Tivoli Group Ltd. 
The Agreement is for an initial period of 36 months anticipated to commence on 10 March 2025.The
council reserves the right to extend the Agreement for additional periods up to a maximum of a
further 12 months.
The value of the Agreement is Five Million, Seven Hundred and Forty-one Thousand, Two Hundred
and Sixty-five Pounds Sterling (£5,741,265) exclusive of VAT, split across the 5 Lots.
Recommendations
It is recommended that Housing Committee:
(1) approves the award of the Agreement to, Greenerleaf Estate Maintenance Ltd. (Lot1);
Caledonian Cleaning Ltd. (Lot 2); Grass Grow Garden Maintenance Ltd. (Lot 3); M Squared
Scotland Ltd. (Lot 4); and Tivoli Group Ltd. (Lot 6), at the value of five million, seven hundred
and forty-one thousand, two hundred and sixty-five Pounds Sterling (£5,741,265) exclusive of
VAT.
(2) notes the requirement for the service to carry out a further procurement exercise to appoint a
contractor to service the requirements of Lot 5 (Motherwell Area) of this contract, and to
introduce interim arrangements for the required work to be carried out while this procurement
is being undertaken. The outcome of this will be reported to a future committee.
Item 13
Page 157 of 198

Page 158

The Plan for North Lanarkshire 
Priority Improve the health and wellbeing of our communities 
Ambition Statement (17) Ensure we keep our environment clean, safe, and attractive 
Programme of Work Resilient People 
1. Background 
1.1. The Housing Service provide a Garden Assistance Scheme for elderly and infirm tenants of
North Lanarkshire who are unable to independently maintain their garden area and who have
no alternative support available to assist them in doing this. The Service is provided free of
charge for council tenants. 
1.2. The garden maintenance service is provided to approximately 5,500 tenants of North
Lanarkshire Council, and through the Contract service users receive 9 grass cuts, 3 hedge
trims, 2 weedkills, and 2 occurrences of edging throughout the growing season between
approximately March and October each year. 
1.3. The ad-hoc garden works contract was introduced in 2013 to allow one off works to be carried
out to properties to bring them to a standard to enable them to be included on and maintained
through, the council’s Garden Assistance Scheme. Additionally, the ad-hoc garden contract
allows the authority to maintain and improve areas, where gardens and other pieces of land
within the housing services portfolio have fallen below an acceptable standard, and where
other ad-hoc works including general tidying and maintenance, grass cutting, hedge cutting,
tree pruning, reforming of garden areas, clearance of debris and path clearing, are deemed
necessary. 
1.4. The purpose of these services is to assist in ensuring the overall environmental and visual
amenity of estates is maintained to an acceptable level. 
1.5. A Framework Agreement for Garden Assistance Scheme and Ad-Hoc Garden Works for the
period 2021 / 2024 (NLC-CPT-20-043) was approved by committee on 25 November 2020.
This Framework was in place to service the garden maintenance works for an initial period
of three years, with the option for a 12-month extension at the discretion of the council. 
1.6. The previous Framework Agreement was split into three Lots:
• Lot 1 – Garden Assistance Scheme North
• Lot 2 – Garden Assistance Scheme South
• Lot 3 – Ad-Hoc Garden Works 
1.7. At the start of the third year in the initial term of the above Framework Agreement, the three
companies on the Framework for Lot 1 - Garden Assistance Scheme North, advised they
were no longer able to fulfil the requirements of the contract as they were unable to employ
the level of seasonal workers required to carry out the volume of work requested. 
1.8. A further procurement exercise was undertaken to establish a new contract which would
ensure we could continue to provide the Garden Assistance services within The North areas
of North Lanarkshire for the remaining term of the original contract. 
Page 158 of 198

Page 159

1.9. As the reason for the original Framework failing was due to the volume of work and inability
to recruit sufficient seasonal staff, it was agreed to split the original Lot 1 Garden Assistance
Scheme North contract, into four smaller geographical areas and to tender for four
contractors to service this work, enabling smaller contractors with smaller workforces to
tender. 
1.10. Following the further procurement exercise, on 6 June 2023, committee homologated the
award of the 4 contracts in respect of the Garden Assistance Scheme – North Zone (NLC-
CPT-23-004) to the following four contractors:
• Lot 1: Grass-Grow Garden Maintenance Ltd
• Lot 2: M Squared Scotland Ltd
• Lot 3: Greenerleaf Estate Maintenance Ltd
• Lot 4: Caledonian Maintenance Services Ltd 
1.11. At the end of the initial contract term all contractors were offered the 12-month extension
period, however all contractors on the Lot 3, Ad-Hoc Garden Works Framework declined the
offer of the extension advising they could not continue to service the contract at the rates
submitted within their original tender submission in 2020. 
1.12. A further procurement procedure was undertaken as a Mini Competition (NLC-CPT-23-087)
from the Garden Assistance Scheme & Ad-Hoc Garden Works, 2021 - 2024 (Lot3 - Ad-Hoc
Garden Works) framework agreement which allowed contractors on this framework to
retender with a revised pricing schedule for a one-year contract which would end at the same
time as the original framework. 
1.13 As a result of the above three procurement exercises the requirements within the Agreement
are currently under contract with the following contractors: 
Garden Assistance Scheme – North Zone – Lot 1 – Grass Grow Garden Maintenance Ltd
Garden Assistance Scheme – North Zone – Lot 2 – M Squared Scotland Ltd
Garden Assistance Scheme – North Zone – Lot 3 – Greenerleaf Estate Maintenance Ltd
Garden Assistance Scheme – North Zone – Lot 4 – Caledonian Maintenance Services Ltd
Lot 2 – Garden Assistance Scheme (South) – Tivoli Group Ltd
Lot 3 – Ad-Hoc Garden Works – Tivoli Group Ltd 
The arrangements for all contracts are due to expire on 28 February 2025 with the Agreement
detailed within this report due to supersede them. 
2. Report 
2.1 A group of technical and procurement representatives was formed to develop and agree the
procurement strategy for the Agreement to enable the council to achieve maximum benefit
for the requirements. 
2.2 The initial estimated value of the Agreement dictated that the procurement procedure be
undertaken in accordance with the Public Contracts (Scotland) Regulations 2015. An advert
for the procurement opportunity was published on the Public Contracts Scotland and the UK
Find a Tender (FTS) website. 
Page 159 of 198

Page 160

2.3 The Agreement opportunity was presented as 6 separate Lots with each Lot providing both
the Garden Assistance Scheme and Ad-Hoc Garden Works services in a specific
geographical area: 
Lot 1 - Coatbridge 
Lot 2 - The North (Kilsyth / Moodiesburn & surrounding areas) 
Lot 3 - Airdrie & Cumbernauld 
Lot 4 - Bellshill 
Lot 5 - Motherwell 
Lot 6 - Wishaw & Shotts 
2.4. In combining the Garden Assistance Scheme and Ad-Hoc Garden Works, this provided the
opportunity for tenderers to have continual work for the full year and would reduce the
requirement to employ seasonal staff, and in reducing the size of each Lot being offered, this
would make the volumes of work more achievable for contractors. Both these changes to the
structure of this contract aim to reduce the potential for the Agreements to fail as in the
previous Framework. 
2.5. Tenderers were permitted to submit a tender response for any number of Lots, however the
Agreement only allowed one Lot to be awarded to any contractor. 
2.6.  Where tenderers were submitting tenders for multiple Lots, they were asked to rank their
submissions in terms of their preference. 
2.7. The procurement procedure was undertaken as an “Open Procedure”. Invitation to Tender
documentation published by the council received a total interest from 20 companies with the
council receiving tender submissions from 6 companies. Each company tendered for one or
more of the Lots being tendered, resulting in a total of 21 tender submissions being received. 
2.8. Based on the evaluation criteria and scoring methodology set out in the invitation to tender
package within the procurement procedure, an evaluation of tender responses received was
completed by members identified by the UIG. Selection stage responses were assessed first
and compliant tenderers that satisfied / declared that they met the published minimum
selection stage criteria progressed to the award stage evaluation. Following identification of
the recommended tenderer(s), their selection stage responses were assessed in more detail
to ensure they satisfied the minimum selection stage criteria applied 
2.9. This recommendation to award the Agreement follows the completion of a procurement
procedure where Greenerleaf Estate Maintenance Ltd. (Lot1); Caledonian Cleaning Ltd. (Lot
2); Grass Grow Garden Maintenance Ltd. (Lot 3); M Squared Scotland Ltd. (Lot 4); Tivoli
Group Ltd. (Lot 6) have been evaluated as demonstrating Best Value for the council. 
2.10. Taking account of tenderers preferences and scores, the preferred contractor for Lot 5 –
Motherwell, was Linear Landscaping Limited. However following the full evaluation process,
it was apparent that the prices tendered by this company were significantly higher than the
prices submitted by all other contractors. When reviewing the prices submitted by Linear
Landscaping Limited against the budget estimated for Lot 5, and the Agreement in full, it
would be cost prohibitive to award Linear Landscaping the agreement for Lot 5. 
2.11. As each of the other five contractors who submitted a tender have been successful in being
awarded an alternative Lot with the Agreement, we will be unable to award an agreement for
this Lot through this procurement exercise, however a further procurement exercise will be Page 160 of 198

Page 161

carried out to tender the services required to fulfil the requirements of Lot 5. Interim
arrangements will be progressed by the service to allow works to be carried out within the
Motherwell area pending the outcome of the future procurement exercise. 
2.12. Appendix 1 confirms the scoring achieved by each tenderer, further details of the
procurement procedure is provided in Appendix 2 and the SME status and location of all
tenderers is located within Appendix 3. 
Financial / Budget Consideration 
2.13 The pre-tender wholelife estimate budget for the Agreement was £6,600,000. Following
completion of the procurement procedure, the value of the Agreement to be awarded is five
million, seven hundred and forty-one thousand, two hundred and sixty-five Pounds Sterling
(£5,741,265) exclusive of VAT. 
2.14 The reduction in value of the Agreement to be awarded against the wholelife estimate is due
to the exclusion of services within Lot 5 – Motherwell from this award. The funds estimated
for the work within this area will be subject to the interim arrangements and the future
agreement procured for this area. 
2.15. The pre-tender estimate was based on the current number of service users utilising the
service against the current spend, taking account of current trends in price increases /
inflation etc. 
2.16 The provision of this service is demand led and therefore the actual spend may vary
marginally from the contract value. 
2.17    The costs associated with delivery of the Agreement will be contained within the Revenue
and Capital budget for Housing Services. 
Price Stability 
2.18 The price for the services provided is fixed for the first two years of the initial 3-year term of
the contract, with a marginally increased fixed price for the remaining year of the initial
contract and the remaining 12-month extension, should we decide to utilise this. This will
allow the service to project spend while also ensuring scope for the contractors to continue
servicing the contracts should there be any future unpredicted inflation in costs associated
with the provision of these services e.g. rises in Living Wage requirements, fuel and
machinery costs. 
Community Benefits 
2.19 The council is committed to maximising the delivery of community benefits. The procurement
included a community benefit requirement, this approach is designed to deliver local
community benefits where possible. 
2.20 Within their tender, Greenerleaf Estate Maintenance Ltd. (Lot1); Caledonian Cleaning Ltd.
(Lot 2); Grass Grow Garden Maintenance Ltd. (Lot 3); M Squared Scotland Ltd. (Lot 4); Tivoli
Group Ltd. (Lot 6) committed to deliver the following community benefits within the
Agreement:  
Page 161 of 198

Page 162

Community Benefit Type Quantity
Committed
Full time employment opportunities  3
Part time employment opportunities 1
Full Time employment opportunities for individuals from a priority group 2
Apprenticeship for individuals from a priority group 3
Access to 1-2-1 mentoring programme 1
Work experience placements 6
Educational workplace visits 1
Financial support for community projects 2 projects
Non-financial support for community projects 9 projects 
2.21 The community benefits delivered as part of the Agreement includes the creation of jobs or
apprenticeships. 
Fair Work First  
2.22 Within their tender submission, Greenerleaf Estate Maintenance Ltd. (Lot1); Caledonian
Cleaning Ltd. (Lot 2); Grass Grow Garden Maintenance Ltd. (Lot 3); M Squared Scotland Ltd.
(Lot 4); Tivoli Group Ltd. (Lot 6) all advised that they will commit to the following areas of the
Scottish Governments “Fair Work First” initiative: 
• They are all committed to paying all employees the Living Wage or higher;
• The do not use zero-hour contracts;
• They are Equal Opportunity Employers who actively aim to address the gender balance;
• They offer flexible working where possible, to address the work-life balance. 
Contract Management 
2.23 Officers from Housing Solutions will be responsible for managing the Agreement which will
be undertaken in accordance with the contract and supplier management conditions applied
within the Agreement. 
3. Measures of success 
The Agreement will deliver the following outcomes; 
3.1 Making North Lanarkshire ‘The place to LIVE’ is within the council’s business plan, by
improving the relationship with communities through the provision of safe and attractive
environments that support the wellbeing of communities, and by ensuring individual garden
areas and any other open plan areas of land within the housing services portfolio within our
communities are maintained to an acceptable standard, can assist in helping us achieve this
vision. 
3.2 This Contract will provide a Garden Assistance Scheme to elderly and infirm tenants living in
North Lanarkshire. It will provide service users with 9 grass cuts, with edging on 2 of these
Page 162 of 198

Page 163

visits, 3 hedge cuts and 2 weedkills throughout the growing season between approximately
March and October each year. This will ensure individual garden areas are maintained to an
acceptable standard, where tenants are no longer able to maintain these independently. 
3.3 The Ad-hoc Garden contract will also contribute one of the Strategic Housing Outcomes
highlighted in the Housing Strategy 2021 2026, which has been developed taking account of
the priorities within The Plan for North Lanarkshire.  Specifically, this contract will contribute
to the achievement of Strategic Housing Outcome 2 – Our communities are vibrant, attractive
and sustainable. Fundamental to achieving a positive impact in this priority is to ensure that
garden areas and open plan areas within the housing services portfolio are maintained to an
acceptable standard, the ad-hoc garden contract will be utilised to assist in achieving this. 
3.4.  The condition of local areas can directly impact on the demand for neighbouring properties
therefore in maintaining the upkeep of the land within the housing services portfolio will
contribute to the overall aesthetics of the area and effectively assist in minimising void rent
loss to the service. 
3.5. Best Value has been considered to be demonstrated by placing a higher emphasis on the
Pricing Strategy within this procurement. We have awarded a 70% weighting to the pricing
element of this contract with 30% weighting being applied to the quality element. In applying
these weightings, the provider who submitted the most competitive pricing and achieved a
higher price score was more likely to be successful in securing the contract.   
4. Supporting documents 
Appendix 1 Summary of Tender Evaluation Process
Appendix 2 Summary of Procurement Process
Appendix 3 SME Status and Location of All Tenderers 
Stephen Llewellyn
Chief Officer (Housing)  
Page 163 of 198

Page 164

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Garden Assistance Scheme has a positive impact on residents with the protected
characteristics of age and disability as it provides a service for elderly and disabled
tenants/ residents of North Lanarkshire to assist them with the maintenance and upkeep
of the garden area at their property. This may assist in enabling elderly / disabled tenants
and residents to live independently within the community 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ Page 164 of 198

Page 165

If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The contractor appointed to this contract will recycle all garden waste arising from the grass
cuts appropriately within the tenants’ garden waste bins, contributing to the council and
national targets for the recycling of garden waste. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
There is a risk that unmaintained gardens within the area will reflect on the overall
upkeep of housing estates and may have a negative impact on our ability to maintain
clean, safe and attractive communities. This could result in the service having difficulty in
allocating neighbouring properties, which may result in reduced income to the service
through void rent loss, which may impact the ability to maximise programmed works. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from the
United Nations Convention on the Rights of the Child (UNCRC). 
Page 165 of 198

Page 166

If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out? 
Yes ☐ No ☐  
Page 166 of 198

Page 167

Appendix 1 – Summary of Tender Evaluation Process 
Lot 1 – Coatbridge
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Contract
Award (Y / N)
1 Greenerleaf Estate Maintenance Limited 100.00% Y
2 Caledonian Cleaning Limited 80.50% N
3 Tivoli Group Limited 76.55% N
4 M Squared Scotland Limited 73.86% N
5 Linear Landscaping Limited 61.84% N 
Lot 2 – The North (Kilsyth/Moodiesburn & surrounding areas)
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Contract
Award (Y / N)
1 Caledonian Cleaning Limited 91.90% Y
2 Tivoli Group Limited 91.11% N
3 Linear Landscaping Limited 61.47% N 
Lot 3 – Airdrie & Cumbernauld
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Contract
Award (Y / N)
1 Grass-Grow Garden Maintenance Limited 94.60% Y
2 Caledonian Cleaning Limited 89.19% N
3 M Squared Scotland Limited 83.56% N
4 Tivoli Group Limited 82.75% N 
Page 167 of 198

Page 168

Lot 4 – Bellshill 
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Contract
Award (Y / N)
1 M Squared Scotland Limited 95.20% Y
2 Tivoli Group Limited 89.45% N
3 Linear Landscaping Limited 74.65% N
4 Grass-Grow Garden Maintenance Limited* N/A N
*Successful in Lot 3 which was their rank 1 preference, so they are excluded from Lot 4 
Lot 5 – Motherwell 
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Contract
Award (Y / N)
1 Linear Landscaping Limited 97.90% Y
2 M Squared Scotland Limited* N/A N
3 Tivoli Group Limited** N/A N
*Successful in Lot 4 so excluded from Lot 5 
**Successful in Lot 6 which was their rank 1 preference, so they are excluded from Lot 5
This Lot is not being awarded as the prices tendered by Linear Landscaping are price
prohibitive for the overall value of this contract. 
Lot 6 – Wishaw & Shotts
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Contract
Award (Y / N)
1 Tivoli Group Limited 93.10% Y
4 M Squared Scotland Limited* N/A N
*Successful in Lot 4 so excluded from Lot 6
Page 168 of 198

Page 169

Appendix 2 – Summary of Procurement Process 
Response
CPT Contract Reference Allocated: NLC-CPT-24-039
Procurement Procedure Utilised: Open Procedure
Governing Legislation /
Regulations: Public Contracts (Scotland) Regulations 2015
Date Contract Strategy Approved: 29 October 2024
Tender Platform Utilised: PCS-Tender (PCST)
Date Contract Notice Published: 08 November 2024
Tender Return Deadline: 11 December 2024
Basis of Award: Quality: 30% Price: 70%
Evaluation Team: Staff from Enterprise and Communities
Anticipated Start Date of the
Agreement: 10 March 2025
Total Agreement Period (Months): 36 + 12 months
NLC Based Expressions of
Interest: 2
Total Expressions of Interest
Received: 20 
Lot Reference / Response
All
Lots 1 2 3 4 5 6
Number of Tenders Received: 21 5 3 4 4 3 2
Tenders from SME’s: 15 4 2 3 3 2 1
Tenders from NLC Based
Tenderers:  0 0 0 0 0 0 0
Tenders from Supported
Businesses: 0 0 0 0 0 0 0
Number of Non−compliant
Tenders: 0 0 0 0 0 0 0
Number of Compliant Tenders: 21 5 3 4 4 3 2
Number of Recommended
Tenderers: 5 1 1 1 1 0 1
Awarded Value of the Agreement: £6.6m £1.14m £0.57m £1.52m £1.08m £0.86m £1.43m 
Page 169 of 198

Page 170

Appendix 3 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
Caledonian Cleaning Limited SME Glasgow
Grass-Grow Garden Maintenance Limited SME South Lanarkshire
Greenerleaf Estate Maintenance Limited SME North Lanarkshire
Linear Landscaping Limited SME South Ayrshire
M Squared Scotland Limited SME South Lanarkshire
Tivoli Group Limited Large Windlesham 
Page 170 of 198

Page 171

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes ☒ No
Ref: HO DM 24 050 (NLC-SLP-24 086)  Date: 12 February 2025 
Homologated Contract Award for Jackson Court Demolition 
From  Stephen Llewellyn, Chief Officer (Housing)
E-mail starbucks@northlan.gov.uk Telephone:
Siobhan Starbuck,
Contract Strategy
Manager via MS
Teams 
Executive Summary 
Committee is asked to acknowledge the actions of the Depute Chief Executive to award a
contract for the demolition of Jackson Court (the ‘Agreement’) to Dem-Master Demolition Ltd. 
The Contract is for a period of 16 months anticipated to commence in January 2025. 
It was necessary to award this contract to allow the demolition works to progress following the
mutual termination of the original contract. 
The value of the Contract shall not exceed Four million, Nine hundred and Eighty-Nine
Thousand, Four hundred and Ninety pounds and Twenty-Five pence (£4,989,490.25)
exclusive of VAT. 
Recommendations 
It is recommended that the Housing Committee:  
(1) Acknowledges the actions of the Depute Chief Executive for the award of the
Agreement to Dem-Master Demolition Ltd at the value of Four million, Nine hundred
and Eighty-Nine Thousand, Four hundred and Ninety pounds and Twenty-Five pence
(£4,989,490.25) exclusive of VAT.
This recommendation followed the completion of a procurement procedure, where the
tender recommended for award was evaluated as providing the most economically
advantageous tender in terms of cost and quality for the Council. 
Item 14
Page 171 of 198

Page 172

The Plan for North Lanarkshire 
Priority Improve the health and wellbeing of our communities 
Ambition Statement (1) Ensure a housing mix that supports social inclusion and
economic growth 
Programme of Work Transforming Places 
Page 172 of 198

Page 173

1. Background 
1.1 The original demolition contract for Jackson Court, Coatbridge, was progressing
satisfactorily until May 2024.  At that time, the main contractor discovered significant
quantities of previously undetected asbestos embedded within the structural joints of
the building. This unexpected finding, which was not identified in earlier surveys, was
a result of the unique construction method employed in the building, making it difficult
to detect through standard survey techniques. The discovery necessitated a
fundamental change to the planned demolition methodology. 
1.2 The original contractor assessed the impact of the asbestos discovery on the contract
and subsequently presented a revised quotation and timeline for completing the works. 
1.3 Upon review, it became evident that proceeding with the original contract, as amended,
was not legally feasible. Accepting the proposed solution and associated cost
increases would constitute a substantial modification to the contract, contravening
Regulation 72 of the Procurement (Scotland) Regulations 2015. 
1.4 Given the circumstances, both the contractor and the council agreed to mutually
terminate the original contract. This termination necessitated the procurement of a new
contract to complete the demolition. 
1.5 Following the termination of the previous demolition contract Jackson Court posed
significant risks to the council due the building being a construction site with the building
been exposed to the elements. The key risks are outlined below:
• Antisocial behaviour: unsecured properties often attract vandalism, graffiti, and
other disruptive activities.
• Environmental contamination: exposure to the elements could accelerate
deterioration, leading to potential environmental hazards.
• Structural deterioration: the exposed building would be more susceptible to
damage, requiring additional costs and time for remediation/demolition. 
2. Report 
2.1 A group of technical and procurement representatives was formed to develop and
agree the procurement strategy for the Agreement to enable the council to achieve
maximum benefit for the requirements. 
2.2 The initial estimated value of the Agreement dictated that the procurement procedure
be undertaken in accordance with the Procurement (Scotland) Regulations 2016. 
2.3 The procurement procedure was undertaken as a “Direct Award” from the Scottish
Procurement Alliance framework agreement for New Build Housing Construction (H2)
- Workstream 6 – Demolition, Decontamination and Associated Site Enabling Works. 
2.4 Following the justification detailed and appraised within the associated contract
strategy document, the Direct Award procedure was considered to demonstrate Best
Value as the SPA framework has been formally tendered in line with Public Contract
Scotland regulations, with Dem-Master Demolition Ltd being the most economically
advantageous tender in that process. 
Page 173 of 198

Page 174

2.5 The tender received from Dem-Master Demolition Ltd underwent appropriate appraisal
to ensure it was complete / compliant with the council’s requirements and demonstrated
best value. The assessment included a comparison between the revised quotation and
programme from the original contractor, and the quotation and programme from the
proposed new contractor. This exercise highlighted a cost avoidance of over £1.2
Million and a significant saving in programme timescales. 
2.6 This new contract mitigates the risks outlined in section1.5 of this report by ensuring
the timely and safe demolition of the building. 
2.7 Additionally, a timely demolition is crucial for the redevelopment of the site.  Delays in
the demolition of Jackson Court would have:
• Increased costs: extended project timelines would lead to increased cost both in
the demolition and the site redevelopment by the New Supply Team.
• Reduced rental income and housing provision:  a delayed demolition would result
in delayed redevelopment this would impact the Housing Revenue Account (HRA)
and ultimately limit the council's ability to provide affordable housing.
2.8 Further details of the procurement procedure are provided in Appendix 1 and the SME
status and location of the tenderer is located within Appendix 2. 
Financial / Budget Consideration 
2.9 The maximum value of the Contract is Four million, Nine hundred and Eighty-Nine
Thousand, Four hundred and Ninety pounds and Twenty-Five pence (£4,989,490.25)
exclusive of VAT. 
2.10 The costs associated with delivery of the Contract will be contained within the HRA
Capital budget for each financial year of the Contract period. 
Price Stability 
2.11 Pricing is fixed for the duration of the contract. 
Community Benefits 
2.12 The council is committed to maximising the delivery of community benefits. The
procurement included a community benefit requirement, this approach is designed to
deliver local community benefits where possible. 
2.13 Within their tender, Dem-Master Demolition Ltd committed to deliver the following
community benefits worth 100 community benefits points in total within the Agreement:   
Page 174 of 198

Page 175

Community Benefit Type Quantity
Committed
TRE01 New Entrants – Key priority Groups 3
Financial Support for a community project (CCE01) 5 
2.14 The community benefits delivered as part of the Agreement includes the creation of
jobs / apprenticeships. 
Fair Work First  
2.15 Dem-Master Demolition Ltd pledged to uphold the principles of the Scottish
Government's 'Fair Work First' initiative, during the initial framework tender by the
Scottish Procurement Alliance. 
Contract Management 
2.16 Officers from the Housing Team will be responsible for managing the Agreement which
will be undertaken in accordance with the contract and supplier management conditions
applied within the Agreement. 
3. Measures of success 
The Agreement will deliver the following outcomes: 
3.1 The appointment of a contractor who has the experience, capability and a
comprehensive health and safety plan to undertake the demolition of Jackson Court in
a timely, efficient and safe manner. 
3.2 Conclusion of a procurement procedure that is compliant with procurement legislation
and internal procedures. 
3.3 Confirmation that Best Value is both demonstrable and achieved; and 
3.4 Delivery of a range of Community Benefits. 
4. Supporting documents 
4.1 Appendix 1 Summary of Procurement Process. 
4.2 Appendix 2 SME Status and Location of Tenderer.
Page 175 of 198

Page 176

Stephen Llewellyn
Chief Officer (Housing)  
Page 176 of 198

Page 177

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-
fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Costs will be contained within the HRA budget. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data? 
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed to
dataprotection@northlan.gov.uk 
Yes ☐ No ☒
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Page 177 of 198

Page 178

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
This contract includes demolition of a building which has a carbon impact. The contract will
ensure as much material as possible is recycled with only hazardous materials such as
asbestos being disposed of. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
All risks are contained in project risk register managed inline with standard council
processes and supported by a specialist demolition consultant. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been made
to ensure there has been appropriate consideration of the relevant Articles from the United
Nations Convention on the Rights of the Child (UNCRC). 
Page 178 of 198

Page 179

If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒  
Page 179 of 198

Page 180

Appendix 1 – Summary of Procurement Process 
CPT Contract Reference Allocated: NLC-CPT-21-163
Procurement Procedure Utilised: Direct Award from Framework
Agreement
Governing Legislation / Regulations: Procurement (Scotland) Regulations
2016
Date Contract Strategy Approved: 02 December 2024
Framework Owner: Scottish Procurement Alliance 
Framework Title: New Build Housing Construction (H2)
Framework Reference Number: Workstream 6
Lot Reference / Title: Demolition, Decontamination and
Associated Site Enabling Works
Companies Appointed to Framework / Lot: Dem-Master Demolition Ltd
Date ITT Published: 02 December 2024
Tender Platform Utilised: PCS-Tender (PCST)
Tender Return Deadline: 16/12/2024 (Tender Returned
04/12/2024)
Number of Tenders Received: 1
Tenders from SME’s: 1
Tenders from NLC Based Tenderers:  0
Tenders from Supported Businesses: 0
Number of Recommended Tenderers: 1
Assessment Team: Officers from Housing 
Anticipated Start Date of the Agreement: 06 January 2025
Total Agreement Period (Months): 16 months 
Awarded Value of the Agreement: £4,989,490.25
Page 180 of 198

Page 181

Appendix 2 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
Dem-Master Demolition Ltd Medium West Lothian 
Page 181 of 198

Page 182

Page 182 of 198

Page 183

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes ☒ No
Ref: HO EE 23 016/ NLC-SLP-24-031 Date: 12 February 2025 
Homologated Contract Award for The Provision of Retrofit and
Contractor Design Appraisal Consultancy Services for Re-Roofing,
Re-Rendering and Energy Efficiency Works 
From  Stephen Llewellyn – Chief Officer (Housing) 
E-mail starbucks@northlan.gov.uk Telephone:
Siobhan Starbuck 
Contract Support 
Manager - via MS 
Teams 
Executive Summary 
Committee is asked to acknowledge the actions of the Depute Chief Executive to award a
contract for “The Provision of Retrofit and Contractor Design Appraisal Consultancy Services
for Re-Roofing, Re-Rendering and Energy Efficiency Works” (the ‘Agreement’) to ECD
Architects Limited. 
It was necessary to award this contract in advance of the Re-Roofing, Re-Rendering and
Energy Efficiency Works contract to allow the retrofit consultancy services to progress in
advance of the associated works contract, which was approved for award at November 2024
Housing Committee. 
The Agreement is for an initial period of 24 months and commenced on 14 October 2024. The
council reserves the right to extend the Agreement for additional periods up to a maximum of
a further 36 months. 
The maximum value of the Agreement shall not exceed Three Million Two Hundred Thousand
Pounds Sterling (£3,200,000.00) exclusive of VAT. 
Recommendations 
It is recommended that the Housing Committee: 
(1) Acknowledges the actions of the Depute Chief Executive for the award of the
Agreement to ECD Architects Limited at the maximum value of Three Million, Two
Hundred Thousand Pounds Sterling (£3,200,000.00) exclusive of VAT. 
Item 15
Page 183 of 198

Page 184

This recommendation followed the completion of a procurement procedure, where the
tender recommended for award was evaluated as providing the most economically
advantageous tender in terms of cost and quality for the Council. 
The Plan for North Lanarkshire 
Priority Improve North Lanarkshire's resource base 
Ambition Statement (1) Ensure a housing mix that supports social inclusion and
economic growth 
Programme of Work Transforming Places 
Page 184 of 198

Page 185

1. Background 
1.1 The requirements of the Agreement have never been contracted before by the council
as a direct consultancy appointment, therefore historical information, data etc. is not
available. 
1.2 The council is committed to improving the energy efficiency of its housing stock through
working towards achievement of the Energy Efficiency Standard for Social Housing
(EESSH) targets for social landlords, as well as national and council Net Zero
commitments. The council is also committed to the improvement of private sector
housing stock in North Lanarkshire through the utilisation of Scottish Government
EES:ABS funding as appropriate. Working toward achieving these targets requires
installation works which were the subject of a separate agreement recommended for
award at November 2024 Committee “MTC for Re-Roofing, Re-rendering and Energy
Efficiency Works including EES:ABS ( NLC-SLP-23-118/ HO RF 23 052”, the scope of
the works agreement includes, but is not limited to: 
• External wall insulation (EWI) and associated works.
• Loft, underfloor and cavity wall insulation. 
• Replacement roofs.
• Photovoltaic roof panels and associated works.
• Ventilation measures.
• Installation of monitoring equipment to assess temperature and humidity
both during and after the works are completed. 
1.3 Retrofit consultancy services were previously included within the scope of the works
agreement, however, it is now recommended by the Scottish Government that the
retrofit consultant should be appointed by the council and not the works contractor to
ensure transparency throughout the full process, therefore, the retrofit consultancy
roles, as defined under PAS2035, and outlined below, are subject to a separate
Agreement to which this report relates: 
• Retrofit designer. 
• Retrofit Coordinator. 
• Retrofit Assessor. 
• Retrofit Evaluator. 
1.4 The award of the Agreement in advance of the works agreement allowed the retrofit
consultant to progress property retrofit assessments 2 months prior to the anticipated
works site commencement date to ensure that there was no delay to the progress of
the works, associated financial spend or EES:ABS funding targets. 
1.5 As contractor design is a requirement within the works agreement, the Agreement also
includes mechanical, electrical and structural engineering consultancy services to
provide advice to the council when checking that the contractor’s design proposals
submitted under the works agreement achieve the council’s requirements. The
contractor design is required to achieve the requirements set out in the assessment
prepared for each property by the retrofit consultant. 
Page 185 of 198

Page 186

2. Report 
2.1 A user intelligence group (‘UIG’) of technical and procurement representatives was
formed to develop and agree the schedule of services required, discuss market
conditions and trends, ways to maximise community benefits and to agree the
procurement strategy for the Agreement to enable the council to achieve maximum
benefit for the requirements. 
2.2  The initial estimated value of the Agreement dictated that the procurement procedure
be undertaken in accordance with the Public Contracts (Scotland) Regulations 2015. 
2.3 The procurement procedure was undertaken as a mini competition under the Scottish
Procurement Alliance framework agreement for Consultancy Services (CS1)
Workstream 3B Retrofit Consultancy PAS 2035/ 2038. (the “Framework Agreement”). 
2.4 Invitation to Tender documentation was issued to four companies appointed to the
Framework Agreement following a capability and capacity enquiry, with the council
receiving two tender submissions. 
2.5 This recommendation to award the Agreement follows the completion of a procurement
procedure where ECD Architects Limited were evaluated as demonstrating Best Value
for the council. 
2.6 Appendix 1 confirms the scoring achieved by each tenderer, further details of the
procurement procedure is provided in Appendix 2 and the SME status and location of
all tenderers is located within Appendix 3. 
Financial / Budget Consideration 
2.7 The pre-tender whole life estimate budget for the Agreement was a maximum of
£3,200,000.00. Following completion of the procurement procedure, the value of the
Agreement to be awarded remains as a maximum of Three Million, Two Hundred
Thousand Pounds Sterling (£3,200,000.00) exclusive of VAT. 
2.8 The final contract value will be dependent upon the number of properties subject to
retrofit assessment and the design advice required in relation to checking contractor
design proposals. Retrofit consultancy services are based on a fixed fee per property
and design advice is based on an hourly time charge. 
2.9 The costs associated with delivery of the Agreement will be contained within the Capital
budget for Housing. 
Price Stability 
2.10 The Agreement pricing is fixed until 30 September 2026. Thereafter, if any optional
extension to the contract period is awarded, prices will be adjusted annually by the
application of the Consumer Price Index (CPI) which is an industry standard approach. 
Page 186 of 198

Page 187

Community Benefits 
2.11 The council is committed to maximising the delivery of community benefits. The
procurement included a community benefit requirement, this approach is designed to
deliver local community benefits where possible. 
2.12 Within their tender, ECD Architects Limited have committed to deliver the following
community benefits within the initial 24 months of the Agreement. These will also be
delivered on a pro-rata basis during any optional extension period awarded under the
Agreement: 
Community Benefit Type Quantity
committed  
Educational Visits 1
Work Experience Placement for an individual16+ years of age 1
Non-Financial Support for a community project/ organisation 2
Financial Support for a community project/ organisation 1 
2.13 The community benefits delivered as part of the Agreement does not include the
creation of jobs or apprenticeships. 
Fair Work First  
2.14 As a supplier on the Scottish Procurement Alliance Consultancy Framework, ECD
Architects Limited have committed to the adoption of fair working practices, including
but not limited to, the following areas of the Scottish Government “Fair Work First”
initiative: 
• Fair and equal pay policy that includes a commitment to supporting the
Living Wage. ECD Architects Limited are an accredited living wage
employer; 
• Clear managerial responsibility to nurture talent and help individuals fulfil
their potential, including for example, a strong commitment to Modern
Apprenticeships and the development of Scotland’s young workforce; 
• Promoting equality of opportunity and developing a workforce in terms of
characteristics such as age, gender, religion or belief, race, sexual
orientation and disability; 
• Support for learning and development; 
• Stability of employment and hours of work, and avoiding exploitative
employment practices, including for example no inappropriate use of zero
hours contracts; 
• Flexible working (including for example practices such as flexi-time and
career breaks) and support for family friendly working and wider work life
balance; 
• Providing a robust mechanism to facilitate whistleblowing and effective
management of concerns raised; and,
Page 187 of 198

Page 188

• Support progressive workforce engagement, for example Trade Union
recognition and representation where possible, otherwise alternative
arrangements to give staff an effective voice. 
Contract Management 
2.15 Officers from Housing will be responsible for managing the Agreement which will be
undertaken in accordance with the contract and supplier management conditions
applied within the Agreement. 
3. Measures of success 
The Agreement will deliver the following outcomes; 
3.1 conclusion of a procurement procedure that is compliant with procurement legislation
and internal procedures. 
3.2 Best Value has been considered to be demonstrated by: 
• The appointment of a consultant who has, via their response to the mini
competition under the established framework, evidenced that they have the
experience and capability to deliver an innovative, high quality and
responsive service to the council, tenants and private owners. 
• Commitment by the consultant to deliver of a range of community benefits
as set out in this report. 
4. Supporting documents 
Appendix 1 Summary of Tender Evaluation Process
Appendix 2 Summary of Procurement Process
Appendix 3 SME Status and Location of All Tenderers 
Stephen Llewellyn 
Chief Officer (Housing)  
Page 188 of 198

Page 189

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The maximum value of the Agreement is Three Million, Two Hundred Thousand Pounds
Sterling (£3,200,000) exclusive of VAT including any option to extend the Agreement. The
costs associated with contract delivery will be contained within the HRA Capital budget for
Housing. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data? 
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Page 189 of 198

Page 190

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The Agreement will directly contribute to the delivery of the council’s Climate Plan
ACT2030 by improving the thermal efficiency of council housing stock. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
Risk will be minimised and managed by a designated contract manager in accordance with
the council’s agreed approach to contract and supplier management. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from the
United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out? 
Yes ☐ No ☐
Page 190 of 198

Page 191

Page 191 of 198

Page 192

Appendix 1 – Summary of Tender Evaluation Process 
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Award      
(Yes / No)
1 ECD Architects Limited 94.40 Yes
One other tender submission was received before the deadline for return of tenders however this
was a non-compliant bid and therefore was rejected and not evaluated. 
Page 192 of 198

Page 193

Appendix 2 – Summary of Procurement Process 
Response
CPT Contract Reference Allocated: NLC-SLP-24-031
Procurement Procedure Utilised: Mini Competition
Governing Legislation / Regulations: Public Contracts (Scotland) Regulations 2015
Date Contract Strategy Approved: 03 July 2024
Framework / DPS Owner: Scottish Procurement Alliance
Framework / DPS Title: CS1 – Consultancy Services
Framework / DPS Reference Number: Workstream 3B
Lot Reference / Title: Retrofit Consultancy (PAS 2035/ 2038)
Companies Appointed to Framework / Lot:
Anderson Bell Christie Limited
Collective Architecture Limited
ECD Architects Limited
Ventro Limited T/A LivGreen
Number of Companies Invited to Take Part: 4
Date ITT Published: 07 August 2024
Tender Platform Utilised: PCS Quick Quote (PCSQQ)
Tender Return Deadline: 28 August 2024
Number of Tenders Received: 2
Tenders from SME’s: 2
Tenders from NLC Based Tenderers:  0
Tenders from Supported Businesses: 0
Number of Non−compliant Tenders: 1
Number of Compliant Tenders: 1
Number of Recommended Tenderers: 1
Basis of Award: Quality: 40% Price: 60%
Evaluation Team: Officers from the Housing team
Anticipated Start Date of the Agreement: 14 October 2024
Total Agreement Period (Months): 24+12+12+12
Maximum Value of the Agreement: £ 3,200,000.00 (excluding VAT)  
Page 193 of 198

Page 194

Appendix 3 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
ECD Architects Limited Medium London 
Ventro Limited T/A LivGreen Medium Devon 
Page 194 of 198

Page 195

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    JMcK/CPT Date 12/02/25 
Contracts Awarded Below Committee Approval Threshold 
From  James McKinstry - Chief Officer (Assets and Procurement)  
E-mail McKinstryJ@northlan.gov.uk  Telephone 07939 281102 
Executive Summary
In accordance with the Council’s General Contract Standing Orders (“GCSOs”), GCSO
21.10 requires a summary report be presented to members with details of contracts
awarded since last committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
Recommendations
It is recommended that the Housing Committee: 
(1) Acknowledge the contract awards made since last committee reporting cycle.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 16
Page 195 of 198

Page 196

1. Background 
1.1 The Local Government (Scotland) Act 1973 section 81 requires local authorities to
“…make standing orders with respect to the making by them or on their behalf of
contracts for the supply of goods or materials or for the execution of works.”. 
1.2 The Council’s General Contract Standing Orders (“GCSOs”) set out the council’s
specific procurement procedures and responsibilities at all spend levels, and include
the reporting requirements of procurement activity, including contracts awards, to
committee for either approval or acknowledgement. 
2. Report 
2.1 In accordance with GCSO 21.10, this report summarises the contract awards since last
committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
2.2 If you require further information regards the contract awards reported, please refer to
the lead service area / Chief Officer detailed in the appendix. 
3. Measures of success 
3.1 All requirements contracted contribute to either the council’s programme of work and/or
fulfil a statutory requirement. 
3.2 All contract awards secure best value for the council in accordance with their evaluation
criteria. 
3.3 All necessary diligence has been undertaken in the evaluation and appointment of
contractors. 
3.4 All contract awards are logged in the council’s contract register. 
4. Supporting documentation 
4.1 Appendix 1 – Summary of contracts awarded. 
James McKinstry
Chief Officer (Assets and Procurement) 
5. Impacts 
5.1 Impacts considered as part of the contract award procedures are recorded in the
individual contract award reports held by the lead service area.  
Page 196 of 198

Page 197

Appendix 1 – Summary of Contracts Awarded 
Contract Ref NLC-SLP-24-002
Title Appointment of Lift Consultant for Lift Replacement Works Phase 4 and Phase 5
Classification Services
Lead Service Area / Chief Officer Stephen Llewellyn, Chief Officer (Housing Management)      
Competition Governance by Value Higher Threshold Regulated Procurement – The Public Contracts (Scotland) Regulations 2015
Procurement Route Open Procedure
No. of Expressions of interest 15
No. of Bids Received 5
Award Criteria Most Economically Advantageous Tender, 40% Quality:60% Price
Evaluation Scores – Successful 96.40%
Evaluation Scores – Unsuccessful (-235.34%) - (-18.17%)
Comments Unsuccessful tenderers were significantly higher priced than the successful tenderer and the scoring
model returned negative scores. 
Award
Details
Value £51,240
Contract Duration 45 months
Contractor Name TUV SUD Ltd
Contractor Size Large Company
Contractor Location East Kilbride, South Lanarkshire
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? No      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☐
HR Policy Impact ☐ Data Protection Impact ☐ Environment / Carbon
Impact ☐
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☐
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 197 of 198

Page 198

Page 198 of 198