Page 1

30 October 23
Members of the
Housing Committee
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk
Notice is given that a Meeting of the Housing Committee is to be held in the Council Chamber, Civic Centre, Windmillhill
Street, Motherwell, ML1 1AB on Wednesday, 08 November 2023 at 10:00 AM which you are requested to attend.
The agenda of business is attached.
Archie Aitken
Chief Officer (Legal & Democratic)
Members :
Clerk Name: Lesley Dysart
Clerk Telephone:
Clerk Email: dysartl@northlan.gov.uk
M McPake, J Reddin, B Baudo, H Brannan-McVey, G Brennan, B Burgess, J Cairns, T Carragher, M Coyle, P Di Mascio,
H Dunbar, F Fotheringham, M Hughes, L Jarvie, D Johnston, J Jones, K Larson, J Leckie, J Logue, F MacGregor, M
McBride, B McCulloch, M McCulloch, P McDade, F McKay, R McKendrick, C McManus, F McNally, J McPhilemy, A
McVey, L Mitchell, L Nolan, P Patton, G Robinson, N Shevlin, A Stubbs, R Sullivan, J Toner, S Watson, G Woods.
Page 1 of 196

Page 2

Page 2 of 196

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical Standards In Public
Life Etc. (Scotland) Act 2000   
Operational   
2 Rapid Rehousing Transition Plan Annual Progress and Future
Activity Homelessness Key Trends and Prevention Duties
Submit report by the Chief Officer (Housing Management) providing (1) an
overview of the progress achieved in year 4 (2022/23) on the delivery of the
actions contained within the RRTP, of which £443,000 funding was provided by the
Scottish Government from the Ending Homelessness Together Fund, and (2) a
summary of the key homelessness trends in North Lanarkshire and future
legislative requirements to pro-actively prevent homelessness through a
collaborative approach with partner services (copy herewith) 
7 - 36 
3 Community Hub Safety - Mobile CCTV Provision
Submit report by the Chief Officer (Housing Management) providing an update on
the use of Mobile CCTV vehicles within North Lanarkshire Council (copy herewith) 
37 - 42 
4 Transforming Places - Tower Strategy Update
Submit report by the Chief Officer (Housing Property Services) providing an
update on current progress relating to the Tower Strategy, and the key
achievements since the last reporting period (copy herewith) 
43 - 52 
5 Non Traditional House Types Update
Submit report by the Chief Officer (Housing Property Services) providing an
update on the progress on the upgrading of a number of the "non-traditional"
housing stock, specifically in relation to works undertaken or planned in the British
Iron & Steel Federation (BISF) properties and the Swedish Timber style houses
(copy herewith) 
53 - 58 
6 Preservation Works Report 2022/23 and 2023/24 YTD
Submit report by the Chief Officer (Housing Property Services) providing an
update on housing repairs which relate to preservation works for 2022/23 and up
to 31 August 23 (copy herewith) 
59 - 64 
7 Housing Repairs and Maintenance  Debt Recovery and
Administration Fees
Submit report by the Chief Officer (Housing Property Services) (1) providing an
update on the current volume of debtors' accounts being issued to tenants and
owner occupiers by the service, and (2) seeking approval to amend the application
of an administration fee, based solely on the value of the invoice (copy herewith) 
65 - 70 
8 Tenant Satisfaction Survey 2023
Submit report by the Chief Officer (Housing Management) providing an update on
the results of the recent tenant satisfaction survey 2023 (copy herewith) 
71 - 78 
9 Transforming Places New Supply Programme - Update on Progress
Submit report by the Chief Officer (Place) (1) providing an update on progress of
the new supply programme, which aims to deliver 5,000 new homes by 2035, and
against annual targets previously set, (2) outlining current challenges in delivering
the programme, and (3) seeking approval for revised targets (copy herewith) 
79 - 90 
10  New Supply Programme - Community Benefits Update
Submit report by the Chief Officer (Place) providing an update on associated
Community Benefits to the new build housing programme since the last report in
November 2022 for the period from 1 September 2022 - 1 September 2023 (copy
herewith) 
91 - 100
Page 3 of 196

Page 4

11  New Supply Programme - Procurement Update
Submit report by the Chief Officer (Place) (1) updating the Committee on current
procurement activity relating to the new build housing programme, and (2) seeking
approval to progress procurement arrangements (copy herewith)   
101 - 108  
Financial   
12  Housing Revenue Account - Revenue Estimates 2024/25
Submit report by the Chief Officer (Finance) presenting to Committee information
that will enable the Council to set its Housing Revenue Account (HRA) budget and
rent levels for 2024/25 (copy herewith) 
109 - 120  
Performance   
13  Scottish Housing Regulator 22/23 Landlord Report
Submit report by the Chief Officer (Housing Management) advising of the Landlord
Report published by the Scottish Housing Regulator (SHR) which shows
Scotland's social landlords' performance for Local Authorities and Registered
Social Landlord (RSL's) against the Scottish Social Housing Charter (SSHC) (copy
herewith) 
121 - 126 
14  Strategic Performance Framework Updates   
14(a)  Strategic Performance Framework latest performance results for
Housing Management
Submit report by the Chief Officer (Housing Management) highlighting the 2022/23
year end performance and the 2023/24 year to date performance of the Housing
Management service for the performance indicators detailed at Appendix 1 to the
report (copy herewith) 
127 - 136 
14(b)  Strategic Performance Framework latest performance results for
Housing Property Services
Submit report by the Chief Officer (Housing Property Services) highlighting the
2023/24 year to date on performance of the Housing Property Services for the
performance indicators at Appendix 1 to the report (copy herewith) 
137 - 146 
14(c)  Strategic Performance Framework latest performance results for
Housing Developments
Submit report by the Chief Officer (Place) highlighting the 2022/23 year end
performance and the 2023/24 year to date performance of the Place Service in
relation to the performance indicators detailed at Appendix 1 of the report for new
housing development (copy herewith) 
147 - 154  
Monitoring   
15  Revenue Monitoring Reports   
15(a)  Revenue Monitoring Report - Housing Revenue Account
Submit report by the Depute Chief Executive providing a summary of the Housing
Revenue Account financial performance for the period from 1 April to 15
September 2023 (Period 6) (copy herewith) 
155 - 162 
15(b)  Enterprise and Communities - Revenue Monitoring Report
Submit report by the Depute Chief Executive providing a summary of the financial
performance of the Enterprise and Communities service for the period from 1 April
to 15 September 2023 (Period 6) (copy herewith)   
163 - 174
Page 4 of 196

Page 5

16  Capital Programme Monitoring Reports   
16(a)  HRA Capital Monitoring Report - 1 April to15 September 2023
Submit report by the Depute Chief Executive reviewing progress towards agreed
spending plans within the 2023/24 HRA Capital Programmes (copy herewith) 
175 - 182 
16(b)  Enterprise and Communities - Capital Monitoring Report
Submit report by the Depute Chief Executive regarding the financial
performance of 2023/24 Enterprise and Communities capital programme
for the period from 1 April to 15 September 2023 (copy herewith) 
183 - 190  
Contract for Noting   
17  Housing and Corporate Repairs and Maintenance Contract and Gas
Central Heating Repairs and Maintenance Contracts - Short Term
Extension
Submit report by the Chief Officer (Housing Property Services) regarding the
application of a short term extensions for the continued delivery of the (1) Housing
and Corporate Repairs and Maintenance services to Mears Scotland LLP, and(2)
delivery of the Gas Central Heating Repairs and Maintenance services to Saltire
Facilities Management Ltd (copy herewith)     
191 - 196 
Page 5 of 196

Page 6

Page 6 of 196

Page 7

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref   SL/AMcG/MK Date 08/11/23 
Rapid Rehousing Transition Plan Annual Progress and Future
Activity / Homelessness Key Trends and Prevention Duties 
From  Stephen Llewellyn, Chief Officer (Housing Management)  
E-mail llewellyns@northlan.gov.uk Telephone 01698 274192 
Executive Summary 
North Lanarkshire’s Rapid Re-housing Transition Plan (RRTP) was approved at Committee
on 24 November 2018 and subsequently submitted to the Scottish Government in
December 2018.  Taking a rapid re-housing approach ensures that those experiencing
homelessness are resettled into a permanent housing option as quickly as possible rather
than lengthy stays in temporary accommodation. 
Transitioning to rapid re-housing provides an opportunity for the council and its partners to
redress the balance of housing and support options availability and accessibility.  This five-
year plan set out the steps required to move forward and deliver the future vision. 
The Rapid Re-housing Plan forms part of the Council’s Strategic Policy Framework with
annual updates provided to committee.  The purpose of this report is to provide an overview
of the progress achieved in year 4 (2022/23) on the delivery of the actions contained within
the RRTP, of which £443,000 funding was provided by the Scottish Government from the
Ending Homelessness Together Fund. It also provides an overview of activities planned to
meet the RRTP objectives in its fifth and final year (as attached in the appendix), for which
£391,000 of Scottish Government funding has been received and seeks approval to
progress these activities as outlined.   
This report also provides a summary of the key homelessness trends in North
Lanarkshire and future legislative requirements to pro-actively prevent homelessness
through a collaborative approach with partner services. 
Recommendations
1) It is recommended that the Housing Committee: 
2) Recognise the progress achieved in meeting the key objectives in year 4 (2022/23)
of the RRTP.   
3) Approve progression of RRTP activities outlined (attached as an appendix) to
prevent and alleviate homelessness aligned to the RRTP funding allocation for
2023/24.
Item 2
Page 7 of 196

Page 8

1. Background 
1.1 The Scottish Government set out their ambition to end homelessness for good within
the Ending Homelessness Together Action Plan which has the delivery of rapid
rehousing at its core.  The RRTP is a planning framework for local authorities and their
partners to transition to a rapid re-housing approach, working collaboratively to
prioritise prevention activity, take a housing led approach to widening access to suitable
long-term housing options and reducing stays in temporary accommodation.     
1.2 The RRTP sits within a wider strategic planning framework, closely aligned to the Local
Housing Strategy (LHS) (2021-2026), the Health and Social Care Strategic Plan and
Strategic Commissioning Plan (SCP) (2020-2023), Strategic Housing Investment Plan
(SHIP) (2022/23 – 2026/27), Locality Outcome Improvement Plans (LOIPs) as well as
the overarching Plan for North Lanarkshire, which sets out our shared priorities and
vision for North Lanarkshire in which inequalities are reduced, through increased
shared opportunities and improved health and wellbeing. 
1.3 The RRTP portrays how North Lanarkshire Council and its partners plan to deliver the
future vision.  It describes the changes required in temporary accommodation supply,
housing supply and multi-agency support to enable settled sustainable housing options
for homeless households as quickly as possible. 
1.4  Part of this plan depicts the delivery of the Homes First project, which aims to provide
a home first, along with wraparound intensive support from a range of partners, to 
assist some of the most vulnerable homeless customers into sustainable living 
arrangements and improve their health and wellbeing. 
1.5 £443,000 of funding was received from the Scottish Government’s Ending
Homelessness Together Fund to deliver the RRTP objectives and priorities in 2022/23,
year 4 of RRTP.  A further £391,000 has been received for the current 2023/24-year
period to progress the remaining RRTP activities in North Lanarkshire.   
1.6 This is the final year of RRTP funding; however, it is likely that future funding will be
provided to enable the implementation of the Prevention of Homelessness Bill which is
expected to be published in the second half of 2023.  This Bill is intended to lead to
system change, person-centred and trauma informed service responses that would
meet individual needs to improve prevention and provide greater choice and control for
those at risk of homelessness. A key tenet of the Bill is the intention to strengthen
housing rights to include wider public bodies to ‘ask and act’ about housing situations. 
1.7 This comes at a time when homelessness is rising across the country and is influenced
by the cost-of-living crisis with surging food and energy costs and ongoing mortgage
4) Consider the key trends in homelessness in North Lanarkshire and future
legislative requirements to prevent homelessness from occurring.
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (24) Review and design services around people, communities,
and shared resources
Programme of Work Resilient People
Page 8 of 196

Page 9

interest rate increases.  Homeless data for 2022/23 indicates that households are
struggling to cope with the financial pressures and seeking support from a range of
services including homelessness.  A summary of key trends is included in this report.   
2. Report 
RRTP Key Progress Achieved 
2.1 The emphasis in 2022/23 has been on strengthening the partnerships within the RRTP
and focussing on key objectives to reduce and prevent homelessness, provide
sustainable housing for homeless households, and respond to the challenges of a post-
pandemic climate and current cost of living crisis. 
2.2  The Homes First Team has had two full years of operation since it was established in
March 2021. The team consists of a partnership of key individuals from Housing, Health
and Social Care, NHS as well as voluntary sector agencies who provide intensive
support for homeless people with complex needs.   
2.3 In the last year, Homes First has upscaled to provide wraparound support to 47
customers and the service is achieving 100% success in assisting those with complex
needs to sustain their home with 26 customers having sustained for over a year.  A
further 8 customers are on their way to independence and in the process of a planned
and agreed stepdown in the provision of their support. 
2.4 A trauma informed approach is now embedded in homelessness practice with a focus
on improving joint assessment and operational processes.  This ensures a person-
centred approach to prevent/reduce homelessness and tenancy sustainment. 
2.5 Other key areas of success and activity over the past year include:
• The creation of a Prevention Officer post to provide prevention support to a range
of customers including young single tenants impacted by financial pressures and  
prison leavers through resolution of tenancy related issues and provision of
housing options advice prior to discharge.  
• Extension of the Furniture Fund to include households experiencing
homelessness across localities, rather than just Homes First customers.  This fund
provides good quality furniture items beyond the provisions of the Scottish Welfare
Fund allowing homeless households to personalise their home and create a
stronger feeling of belonging. Feedback highlighted that improved personalisation
impacted positively on tenancy sustainment and an overall stronger feeling of
wellbeing.  
• The creation of a Technology Fund, which was rolled out to housing localities
during 2022/23, providing digital devices, such as phones, laptops and chrome
books to homeless households to improve digital inclusion and access to online
services.
• Continuation of the Housing Self-Directed Support Fund enabling Homes First
customers to access a broad range of supports and services such as gardening
works, cleaning services, and driving lessons. These person-centred supports
have empowered customers to have greater choice and control and contributed
to improvements in tenancy sustainment as well as health and wellbeing. 
• A part time peer mentor post was created during 2022/23, which has been recently
expanded to a full-time post, to provide peer mentoring and support around
employability and training opportunities for Housing First individuals. Activities
Page 9 of 196

Page 10

have entailed taster sessions at New College Lanarkshire, hillwalking and
gardening at Summerlee Heritage Park, accredited horse-riding courses, bowling,
and golf lessons.  There is the intention to partner with the Wise Group on their
new Relational Peer Mentoring service pairing people who require support with
employability, fuel poverty or justice to peer experienced mentors.
• Blue Triangle implemented an innovative ‘Tenant Guarantor’ test of change during
2022/23, which delivers intensive housing support for people with very complex
needs, complimenting the existing Homes First service.
• The continued delivery of accommodation for young people leaving care in
partnership with Health and Social Care. Reception flats and a training flat are
provided to build confidence and independent living skills, improve the overall
level of tenancy sustainment, and avoid homelessness wherever possible. 
Future Actions 
2.6 Future RRTP activity will continue to concentrate efforts on partnership working to
address underlying causes of homelessness as well as a focus on early intervention
to sustain tenancies and prevent the trauma of homelessness wherever possible. 
2.7 Homes First will continue to provide pivotal intensive support for the most complex
homeless households with a clear plan to improve outcomes and sustain tenancies.   
2.8 A one year contract was awarded for the tenancy sustainment service provided by Say
Women, extending the initial Scottish Government funded pilot in North Lanarkshire. 
This service engages with young women aged 16-25 years who have experienced
childhood sexual abuse or another form of sexual violence and are or at risk of
homelessness. Capacity will be increased to take referrals from across all locality
housing teams as well as Homes First.   Training was delivered to all housing localities
on child sexual abuse and the links to housing and homelessness. 
2.9 Alternatives to Violence Programme (AVP) Britain will facilitate a workshop aimed at
breaking the cycle of offending for Homes First customers who wish to address conflict,
anger, and violence in their lives. The AVP workshops will be extended to restorative
justice identifying individuals who will receive hours against Community Payback
Orders (CPOs). Alternatives to Violence Programme (AVP) Britain offers ‘Facing Up to
Conflict’ programmes taking a holistic approach to tackling violence and conflict in
society to build better and healthier relationships. 
2.10 In conjunction with the Alcohol and Drug Partnership, an ‘Out of Hours’ Crisis
Response Service will be jointly funded and will provide assertive outreach to
individuals with complex needs at key times when they are experiencing heightened
vulnerabilities in the evenings or weekends which are out with standard office hours. 
2.11 A new pilot Household Support Fund has been developed to focus on assisting young
single households aged 16-26 in receipt of Council Tax Single persons discount/
exemption experiencing financial hardship.  This fund will support those who are or at
risk of homelessness with rent arrears, energy, and food vouchers to alleviate their
financial hardship. The RRTP Team have been liaising with the Energy and Fuel Debt
Advice Service managed by the Wise Group to address issues around households
with meter debt and energy vouchers are now being distributed to eligible people.   
2.12 In partnership with Barnardo’s, Keys to the Future has been established providing
practical and emotional support to families experiencing homelessness. The service
is funded through the Barnardo’s Foundation for three years. Further detail of all
activity planned is outlined in the attached Appendix.
Page 10 of 196

Page 11

Current Context and Challenges 
2.13 Tackling homelessness continues to be a challenge in North Lanarkshire, as it is across
Scotland, despite the positive efforts to prevent homelessness and implementation of
a rapid rehousing approach.  There is significant pressure on both permanent and
temporary accommodation due to rising waiting lists and homeless applications. These
rises are being driven by the economic climate of a cost-of-living crisis, rising mortgage
interest rates and the removal of local connection rules within homelessness legislation.
Whilst wider changes are impacting on the wider housing market, in particular the
private rented sector, through rising mortgage costs, legislative changes such as the
rent cap, rate rises in Land and Buildings Transaction Tax for buy to let properties and
increasing compliance and regulation.  All of which is reducing the availability of wider
housing options through the departure of private landlords from the housing market. 
This in turn increases pressure on social rented homes.   
2.14 Further anecdotal evidence exists which indicates emerging complexities in relation to
the private rented sector in North Lanarkshire. This includes reports from locality
housing teams of an increase in approaches from private rented sector tenants for
housing assistance and advice in response to notice from a landlord of their intention
to sell the property or to live in the property themselves. It is apparent through
interactions over recent months that many private sector tenants require support in
relation to exercising their rights.  Although there are safeguards in place for private
sector tenants, which include the temporary moratorium on evictions and the rent cap
through the Cost of Living (Tenant Protection) (Scotland) Act 2022, significant
challenges remain to help ensure the Private Rented Sector provides accessible and
sustainable housing solutions for households. 
2.15  The current supply issues are further exacerbated by post-pandemic issues such as
the ability of power companies to respond to meter repairs, shortages of tradespeople
and building materials, as well as increased cost of materials to build new homes or
complete void work; all of which impacts on the number of households in temporary
accommodation and the ability to move households into a tenancy. 
Key Homelessness Trends 
2.16  Over the 2021/22 - 2022/23 period homeless applications have risen by 13% in North
Lanarkshire. This is similar to the national picture, although applications have risen
slightly more in North Lanarkshire compared to Scotland overall (9% increase). In
2021/22, there was a very slight increase of 0.7% on the previous year 2020/21, which
followed a period of decreasing homelessness applications since 2018/19. 
2.17 The recent increase in homelessness applications is considered to be partly attributed
to the cost-of-living crisis. Feedback from frontline staff identifies that rising energy and
food costs are putting increased financial pressure on families which has led to an
increase in households seeking assistance. However, it is worth noting that the number
of homeless applications (1,917 in 2022/23) is still significantly lower than the 2,366
cases reported pre-Covid in 2018/19. 
2.18 Reasons for homelessness are broadly similar to previous years with those being
asked to leave representing the largest proportion.  Disputes within household (violent
or abusive) appears to be increasing over the past five years to 16.2% in 2022/23 from
13.5% in 2018/19 with an increase of 1.6% between 2021/22 and 2022/23. 
Page 11 of 196

Page 12

2.19 The number of homeless households with children has increased to 32.4% in 2022/23
from 30.4% in 2021/22, decreasing from 36.7% in 2018/29.  Single parent households
have increased to 27.5% from 25.3%, following decreases in the preceding years from
29.8% in 2018/19. 
2.20 The proportion of 16–25-year-olds has fallen from 30.9% in 2018/19 to 24.1% in
2022/23, while the 26-59 age group has been increasing from 65.9% in 2018/19 to
71.3% in 2022/23. The decrease in the 16-25 age group may be a result of prevention
activities targeted at young people to improve tenancy sustainment and early
partnership intervention approaches to identify housing options to avoid young people
becoming homeless in the first instance. 
2.21 There has been a slight reduction in the proportion of households with children residing
in temporary accommodation over the 2021/22 - 2022/23 period, with households with
children residing in temporary accommodation accounting for 22.1% of all households
in temporary accommodation at the end of March 2022 compared to 21.7% of all
households at the end of March in 2023. 
2.22 The average time spent in temporary accommodation for cases that closed is 145 days
in 2022/23, for 2021/22 this figure was 131 days.  This is significantly better than the
Scottish average of 223 days. 
2.23 It took an average of 171 days to close a case for homeless households in 2022/23
compared with 158 days in 2021/22. North Lanarkshire compares favourably against
the Scottish average of 266 days to close a case for homeless households. 
Future Homeless Prevention Duties 
2.24 The Scottish Government intend to bring forward a Prevention of Homelessness Bill in
the second half of 2023.  The new legislation is intended to strengthen the level of
housing rights for individuals, improve homelessness prevention activity across
partners and provide greater choice and control for those at risk of homelessness.   
2.25 The ethos is that responsibility to prevent homelessness should be a shared public
responsibility where all public bodies will have the responsibility to ‘ask and act’ if a
person they are working with is homeless or at risk of homelessness.  This duty will
also be applied to all landlords within the social and private rented sectors. 
2.26 The Bill will include key proposals for all partners to collaborate in the provision of
community planning and delivery of services with a focus on unmet health and social
care needs and enabling comprehensive support to those individuals who have multiple
and complex needs.   
2.27 These proposals are far reaching and will likely present significant resource
implications for all partners involved, especially in this time of significant challenge and
uncertainty.  It is not yet known how these resource requirements will be met but the
Scottish Government has indicated that this is currently under consideration and will be
articulated once the Bill has been given royal assent and an implementation date
identified.   
3. Measures of success 
Page 12 of 196

Page 13

3.1  Delivery of actions set out in the RRTP Action Plan (as attached in the Appendix to this
report). 
3.2  Reduced homelessness, improved tenancy sustainment and wider life outcomes, as
well as reduced health and social inequality for people affected by homelessness.   
4. Supporting documentation 
4.1 Appendix – Rapid Re-Housing Transition Plan Action Plan 2023-2024   
Stephen Llewellyn 
Chief Officer (Housing Management) 
Page 13 of 196

Page 14

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
An EqIA was completed as part of the development of the RRTP and is regularly
reviewed.  Impacts of RRTP delivery is positive for all groups. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 14 of 196

Page 15

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Risk is identified in relation to failure to deliver/progress the RRTP actions and
priorities as outlined.  This risk is assessed and recorded on the Service Risk
Register under the Local Housing Strategy (2021-2026) and managed accordingly. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
The delivery of the RRTP is positive for all groups including Armed Forces
Personnel when they seek housing assistance.     
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☒ No ☐
Page 15 of 196

Page 16

If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
A Children’s Rights and Wellbeing Impact Assessment was undertaken for the LHS
2021-2026. 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☒ No ☐ 
Page 16 of 196

Page 17

Appendix – Rapid Rehousing Transition Plan
Action Baseline 2022 Milestones Timescale Lead  Progress Update
Objective 1: Proactively prevent homelessness by extending housing options model across all
partners who are supporting those facing housing crisis 
KEY ACTION 1.1 
Roll out Housing
Options Training
Toolkit across Multi-
Agency Partnership
Housing Options
Toolkit
developed and
launched 
Continue to roll out Housing Options Toolkit
widely to embed improved, consistent
approaches to housing options advice and
information 
2024 Business
Development
and Support
Housing options
training toolkit
launched.
Continue to participate in the ongoing
development and learning impact
assessment of the Housing Options Toolkit
via the Housing Options Steering Group and
Learning Impact Assessment Group 
2024 Business
Development
and Support
Initial learning
impact assessment
carried out, showing
positive feedback.
KEY ACTION 1.2 
Optimisation of
rehousing process
through Common
Housing Register,
common Allocation
Policies and
common matching
process teams
34.5% lets to
Homeless list
(2021/22) –
additional lets
also made via
general list to
applicants with
confirmed loss
of
accommodation
Continue to review NLC % lets to homeless
households and to general list for applicants
with ‘confirmed loss of accommodation’ to
ensure delivery of RRTP objectives – Info
now included in RRTP RAG 
2023 RRTP Team April 23 – Housing
localities to focus
predominantly on
lets to homeless to
clear existing
caseload – Continue
to monitor on
monthly basis, with
current % lets to
homeless
households at 41%. 
Page 17 of 196

Page 18

Action Baseline 2022 Milestones Timescale Lead  Progress Update
12.38% lets
(2021/22)
Work with RSL partners to review and to
increase % lets to homeless households 
2023 RRTP Team Re-establishment of
RSL practitioner’s
forum September 22
specific agenda to
increase % lets –
Contact information
for housing localities
disseminated. 
Change to
Lanarkshire Housing
Association
allocation policy -
points awarded to
Stat Homeless
increased to 150.
KEY ACTION 1.3 
Develop and
implement robust
protocols between
partners for
homeless
households
Revised Care
Experienced
Young People’s
Protocol
developed,
launch and
awareness
raising planned
Implement revised Care Experience Young
People’s Protocol and Pathway in partnership
with H&SC 
2023 RRTP Team/
Health and
Social Care
Complete.
Page 18 of 196

Page 19

Action Baseline 2022 Milestones Timescale Lead  Progress Update
accessing services
to improve
engagement and
take up of services
Reception flats
and training flat
established
Continue to deliver bespoke housing and
support solutions for Care Experienced
Young People facing housing crisis and to
help equip young people with the skills and
confidence for managing a tenancy through
delivery of: 
• The Reception Flats
• Training Flat 
2023 RRTP Team Revised procedures
and arrangements in
place to monitor
effectiveness and
usage of reception
flats and training
flats.
- Consider,
develop and
implement IT
requirements to
identify and
track CEYP 
Consider alternative process to taking a
homeless application for Care Experienced
Young People using Reception Flats 
L&A marker on person record – effective
criteria developed for identification for CEYP
which involves multi agency discussion 
2022 Business
Development
and Support
IT fix implemented in
March 23.
Guidance exists
but refresh
required
Develop joint procedural guidance in
partnership with H&SC on supporting people
with ‘No Recourse to Public Funds’ to ensure
consistent and improved approaches 
2022 Business
Development
and Support
Work ongoing to
develop revised
procedures.
Page 19 of 196

Page 20

Action Baseline 2022 Milestones Timescale Lead  Progress Update
‘Test of change’
pilots being
explored around
‘whole systems
approach’
Continue to work with the ADP, H&SC and
other partners to assess need, identify gaps
and develop services to meet needs
2024 All partners Work ongoing on
several platforms to
identify need, gaps
and improve
services (including
but not limited to
ADP Improving Care
Programme,
membership across
ADP Board and
Partnership Boards).
Housing
representation
across all
community care
planning
structures in
place 
Continue to participate in the Strategic
Planning Group, Health and Social Care
Partnership Boards, ADP Board and other
community care planning structures to
identify opportunities to improve access to
services, engagement, identify gaps and
better meet needs 
2024 Business
Development
and Support/
Housing
Operations/
RRTP Team
Housing
representation in
place across health
and social care
boards.
KEY ACTION 1.4 
Continue to develop
preventative
approach to
homelessness
Homelessness
Prevention
Duties
Consultation
closed at the
end of March
2022 – awaiting
publication of
new duties
Review prevention and early intervention
activities in line with the enactment of the
new future Homelessness Prevention Duties 
2024 RRTP Team/
Business
Development
and Support
Not started.
Page 20 of 196

Page 21

Action Baseline 2022 Milestones Timescale Lead  Progress Update
Case file audits
and support
review carried
out, providing
some insights
into prevention
and early
intervention
activities
Carry out an evaluation of prevention and
early intervention activities taking place
currently in advance of the new duties to
improve tenancy sustainment and reduce
homelessness 
2023/24 RRTP Team/
Business
Development
and Support
Not started.
RSLs are key
partners in the
RRTP Steering
Group
Work in partnership with RSLs to identify
resources to develop homelessness
prevention and reduce incidence of housing
crisis 
2024 RRTP Team Linked to earlier key
actions on
increasing % lets
amongst RSLs.
Health and
Homeless Plan
developed and
implemented 
Implement Health and Homelessness Action
Plan 
2024 Health and
Social Care 
Work ongoing to
refine the Health &
Homeless action
plan.
Page 21 of 196

Page 22

Action Baseline 2022 Milestones Timescale Lead  Progress Update
• ‘Accessi
ng
Opportu
nities’
pilot
complete
identifyin
g
barriers
and
opportun
ities
• Employa
bility
colleagu
es
represen
ted in
RRTP
planning
structure
s to
identify
opportun
ities and
overcom
e
barriers
Continue to develop employability services
for those most disadvantaged households
affected by homelessness
2024 RRTP Team Salvation Army now
working with HF
individuals on
training
opportunities, CV’s,
job applications.
Routes to Work now
attending HF
Working Group
meetings, vacancy
list being distributed
monthly. 
- Create and implement a new dedicated post
on prevention to work in tandem with the
Housing First Team and wider housing
locality teams, H&SC and wider partners 
2023 RRTP Team Prevention 
Co Ordinator now in
place Jan 23.
Page 22 of 196

Page 23

Action Baseline 2022 Milestones Timescale Lead  Progress Update
Furniture fund
which funds
additional items
beyond SWF
items in place
for Housing First
clients 
Extend access to the existing ‘Furniture Fund’
beyond Housing First clients to enable wider
positive outcomes for people who are
homeless/at risk of homelessness
2023  RRTP Team Roll out commenced
September 22 to all
housing localities for
individuals who are
homeless in temp
accommodation and
receiving support.
I HUB groups
and
workstreams at
an advanced
stage with
membership
from NL
Housing and
ADP
Continue to be involved in the I Hub ADP and
Homelessness Programme to identify
barriers and opportunities to improve
pathways and access to services
2023 Business
Development
and Support/
RRTP Team
Final
recommendations
report published.
KEY ACTION 1.5 
Improve our
understanding of the
needs and
requirements of
LGBTQ+ service
users
Some research
carried out as
part of the Local
Housing
Strategy
development to
identify needs
and
requirements of
LGBTQ+ people
Carry out consultation with LGBTQ+
households to gain a better understanding of
needs and requirements 
2024 Business
Development
and Support
Research to be
commissioned from
external organisation
with specific
expertise in this
area.
E- learning
LGBTQ+
module created
Multi-agency workforce development and
training 
2024 LOD  E-learning module
created and
available for use.
Page 23 of 196

Page 24

Action Baseline 2022 Milestones Timescale Lead  Progress Update
CHR data
collection being
considered as
part of new
requirements of
equality
characteristics
collation 
Consider opportunities to enhance data
collection and monitoring to enable improved
services
2024 Business
Development
and Support
On track – work
underway to explore
enhanced equality
data capture via
CHR.
KEY ACTION 1.6 
Improve policy,
training and services
in relation to
domestic abuse to
improve outcomes
and reduce
homelessness
Policy
development
underway
Develop and implement a Housing Domestic
Abuse Policy in partnership with specialist
organisations in North Lanarkshire and
people with lived experience
2023 Business
Development
and Support
Complete –
approved at
committee.
Funding from
Equally Safe
Fund secured to
extend Safe and
Together
training to
housing staff
and other key
council services
Extend and deliver Safe and Together
training to housing staff 
2023 Business
Development
and Support
On track – training
delivered.
Housing
representation
on both strategic
and operational
groups as well
as MARAC and
MATAC
structures
Participate in the Violence Against Women
Strategic Partnership and Operational
Partnership to improve policy, procedures,
training and services for people affected by
domestic abuse
2023 Business
Development
and Support/
Housing
Operations
Strategic and
operational housing
representatives in
place for the
Housing Service.
Page 24 of 196

Page 25

Action Baseline 2022 Milestones Timescale Lead  Progress Update
Participation
agreed
Participate in the national ‘REVIVE’ project to
improve housing outcomes and prevent
homelessness
2023 Business
Development
and Support/
Housing
Operations
Signed up as
participating partner.
Project recently
commenced
Implement and deliver SAY Women tenancy
sustainment service for young women who
have experienced sexual abuse
2023 RRTP Team/
Business
Development
and Support
SAY Women
Service extended
beyond the initial
Scottish
Government funded
pilot until March
2024.
KEY ACTION 1.7 
Continue to improve
digital services to
improve digital
inclusion amongst
people who are
homeless/at risk of
homelessness
Digital NL
workstreams
underway
Consider how Digital NL can assist us to
improve services for people affected by or at
risk of homelessness 
2024 Business
Development
and Support
Discussion to take
place re possible
options.
- Consider, develop and implement IT
requirements to identify and track Housing
First households
2024 RRTP Team Housing first marker
on person record –
effective criteria
developed for
identification for HF
which involves multi
agency discussion.
- Introduce dashboard of information via Power
BI
2024 Business
Support and
Development
Work ongoing in use
of Power BI.
Page 25 of 196

Page 26

Action Baseline 2022 Milestones Timescale Lead  Progress Update
- Establish and implement a ‘Technology Fund’
to improve access to a suite of technology for
Homes First clients and people who
experience homelessness
2023 RRTP Team In progress - £40k
identified for spend
2022/23 rolled out to
housing localities for
individuals who are
homeless in temp
accommodation and
receiving support.
KEY ACTION 1.8 
Implement further
measures to ensure
a proactive
approach to prison
releases in line with
SHORE standards 
PAS
modifications
commenced
Establish PAS recording for all short-term
prisoners to enable SHORE standards to be
monitored 
2024 Business
Development
and Support/
Public
Protection
Team
Complete.
Some work
undertaken
currently,
although scope
exists to
improve
Establish housing links to courts at point of
remand – Criminal Justice reps on RRTP
Steering Group
2024 TBC Under discussion.
KEY ACTION 1.9 
Implement audit
processes on
Housing Options
Interviews to ensure
consistent, high-
quality information
and advice 
- Establish regular audit process on quality
which includes a focus on protocol/priority
points for domestic abuse, Care Experienced
Young People, and other priority
groups/complex needs 
RRTP RAG now provides data in relation to
% lets to households with protocol points
2023 Business
Development
and Support
Audit already
complete – requires
to be scheduled into
regular audit cycle.
Page 26 of 196

Page 27

Action Baseline 2022 Milestones Timescale Lead  Progress Update
KEY ACTION 1.10 
Improve approach to
tenancy sustainment
- Develop and implement tenancy sustainment
policy
2022 Business
Development
and Support
Complete.
KEY ACTION 1.11 
Ensure wider links
and activity to early
prevention and
intervention in health
and broader settings
GP link workers
in place
Review Health and Homelessness Referral
process and housing locality links to GP link
workers
2022 RRTP Team/
Health and
Social Care
Challenges in
relation to accessing
link workers, work
ongoing to improve
access. 
Referral
pathways
implemented
Review Education Services links and referral
pathways implemented to ensure
effectiveness 
2022 RRTP Team/
Education
Referral process in
localities to be
explored further to
identify issues/any
scope for
improvement.
- Introduce routine enquiry on current housing
status to identify those at risk of
homelessness and establish pathways
between housing and health.  To initially
focus on key areas: 
• Midwifery
• Health visiting
• ED and psychiatric liaison
• Mental health and addiction services 
2024 Health and
Social Care
Not commenced,
although initial
discussions held.
Page 27 of 196

Page 28

Action Baseline 2022 Milestones Timescale Lead  Progress Update
KEY ACTION 1.12 
Improve quality,
consistency and
access to
information, advice
and signposting in
relation to
prevention across
services and partner
organisations
- Carry out review of information, advice and
signposting available on websites, in offices,
in other formats, in relation to prevention 
2023 RRTP Team Not commenced –
prevention officer to
lead, in interim work
will be undertaken to
ensure information is
accurate on website,
offices and other
mediums. 
Implement any recommendations arising
from the review to improve quality,
consistency and access to information,
advice and signposting
2023 RRTP Team  As above – not
commenced yet.
Objective 2: Enable service users with no/low support needs to access settled housing quickly 
KEY ACTION 2.1 
Improve access to
the Private Rented
Sector for homeless
people, people at
risk of
homelessness and
reduce
- Develop and implement a Private Rented
Sector Access Scheme
2023 Business
Development
and Support
PRS Access
Scheme proposal
paper developed,
and also discussed
at the Private
Landlord Forum. 
Challenges exist in
relation to
implementation.
Page 28 of 196

Page 29

Action Baseline 2022 Milestones Timescale Lead  Progress Update
homelessness from
the Private Rented
Sector
Rent Deposit
Guarantee
Scheme in place
but under-
utilised with
scope to re-
design to
improve uptake
Review the Rent Deposit Guarantee Scheme
and make recommendations to improve
access/re-design – Reviewed & streamlined
– Briefing sessions for housing localities to
increase uptake
2023 Julie Smith Full review of
scheme complete.
Panel re-
established with
operational
housing
representation
Enhance partnership working with the Private
Rented Sector Panel for landlord registration,
Below Tolerable Standard Issues and
evictions
2023 Housing
Operations
Identified ops rep on
panel.
Date arranged
for 10th May
2023
Improve engagement with private landlords to
increase awareness of responsibilities and
rights, to improve quality, reduce
homelessness and improve access to the
sector via establishing a Private Landlord
Forum 
2022 Business
Development
and Support
Forum re-
established and
work ongoing.
Development of
resources and
e-learning
module
underway
Develop and deliver Private Rented Sector
training and resources for frontline housing
staff to improve knowledge and skills in
delivery of wider housing options advice 
2022 Business
Development
and Support
E-learning module
developed and rolled
out to all locality
housing staff.
KEY ACTION 2.2 
Conversion of
temporary furnished
flats to settled
homes/Scottish
Secure tenancies
Procedure of
flipping
temporary
accommodation
developed and
implemented
Continue to where possible flip temporary
accommodation to settled mainstream
accommodation where this is suitable and
continue to audit to inform efficacy
Ongoing  RRTP Team Reduction in flipped
tenancies recorded
in recent months -
Continued focus
across housing
localities 
Page 29 of 196

Page 30

Action Baseline 2022 Milestones Timescale Lead  Progress Update
KEY ACTION 2.3 
Increase housing
supply for homeless
households or
people at risk of
homelessness
75 homes
purchased over
the 2021/22
Increase Buy Back and Empty Home
Purchase Scheme initiatives to increase
supply for homeless households 
Ongoing New Supply
Team
OMPS expanded
twice in the past
year, firstly to enable
purchase of a home
in a block where the
council owns the
rest of the block to
enable common
works and most
recently to enable
purchase from a
private landlord to
prevent
homelessness.
389 affordable
homes delivered
in 2021/22
Deliver 300 new social rented homes per
annum through Affordable Housing Supply
Programme (SHIP) – housing supply target to
be reviewed following completion of HNDA3 
Ongoing New Supply
Team
Delivering and
exceeding current
target set out in
HNDA2 – new target
will be set out
following completion
of HNDA3.
Pilot
commenced
Pilot of providing two offers of housing
concurrently
2022 RRTP Team Underway in
Cumbernauld and
Airdrie locality, for
roll out across other
localities.
Page 30 of 196

Page 31

Action Baseline 2022 Milestones Timescale Lead  Progress Update
KEY ACTION 2.4 
Implement North
Lanarkshire Council
Local Housing
Strategy (2021-
2026) Strategic
Housing Priority 3:
We prevent and
resolve
homelessness
effectively
Local Housing
Strategy
published and
implementation
underway over
the 2021-2026
five-year period
Appropriate action taken to progress Amber
and Red Actions identified through LHS
Review process 
2026 Business
Development
and Support 
LHS Steering Group
meets quarterly and
annual progress
report reported to
committee.
Objective 3: Develop interim housing options which enable housing sustainment and independent
living 
KEY ACTION 3.1 
Minimise time
homeless
households spend in
temporary
accommodation 
158 days (23
weeks) average
case duration
2021/22 period
Reduce homeless case duration  Ongoing RRTP Team Work ongoing with
localities.
- Develop PIE Design Guide in partnership
with Third Sector Providers 
2023 Business
Development
and Support
Not commenced yet.
Design of Bank
Street underway
Complete remodelling/reconfiguration of
residential accommodation at Bank Street 
2024 New Supply
Team
Project at design
stage.
Refurbishment
plans scoped 
Complete refurbishment of Black Street 2023 Housing
Property and
Projects
Refurbishment costs
have now increased
significantly
rendering the project
financially unviable. 
Alternative options
being considered.
Page 31 of 196

Page 32

Action Baseline 2022 Milestones Timescale Lead  Progress Update
658 units
(comprising
dispersed,
specified and
supported
places)
Continue provision of residential
accommodation through supported and
specified units where required 
Ongoing Housing
Operations
Ongoing
Objective 4: Extend Housing First model enabling the most complex and disadvantaged service users
to quickly access and successfully sustain settled accommodation 
KEY ACTION 4.1 
Deliver and continue
to develop the
Housing First
Support Service for
those with most
complex needs
Housing First
Team
established 
Continue to deliver Housing First Support via
the Housing First Team to 25 Housing First
clients and 20 pathfinder clients - explore
potential to extend/scale up – Additional 3
Forever Homes individuals transferred to
service
Ongoing RRTP Team  46 HF individuals
housed, 1 awaiting
offer
26 sustained over 1
year.
7 individuals in step
down process – 8
New h/holds
identified.
- Review and redesign the Housing First
Support Service Contract in tandem with the
existing Housing Support commissioned
contracts, internal housing support and health
and social care support to deliver a
sustainable, longer-term service that meets
the broad range of needs and delivers on the
RRTP objectives
2024 RRTP Team/
Business
Development
and Support
Options appraisal
commenced.
Housing Self-
Directed
Support Fund
established
Increase access/uptake of the Housing Self
Directed Support Fund for Homes First
clients
2023 RRTP Team  50k per annum -
SDS being utilised to
assist HF individuals
with opportunities to
improve health &
wellbeing 
Page 32 of 196

Page 33

Action Baseline 2022 Milestones Timescale Lead  Progress Update
Potential model
options explored
Explore piloting an ‘Out of Hours’ Crisis
Response Service to prevent and mitigate
housing crisis, improve access to assertive
outreach and prevent tenancy failure
2023 Business
Development
and Support
Contract awarded to
Turning Point
Scotland to deliver a
service which
provides crisis
response, assertive
outreach and
overdose response. 
Being funded by
ADP with a
contribution from
RRTP for year 1 of
the service.
KEY ACTION 4.2 
Consider how
Addictions Services
can be redesigned
to meet the needs of
homeless
households with
most complex needs 
Housing
represented on
the ADP and
senior social
worker post
integrated within
the Housing
First Team to
improve
pathways
Contribute to the ADP Board and explore
opportunities to improve access and referral
pathways to addiction services for homeless
households and those at risk of
homelessness 
Ongoing RRTP Team Strategy attend ADP
meetings and senior
social worker in post
to assist with
developing
pathways.
Page 33 of 196

Page 34

Action Baseline 2022 Milestones Timescale Lead  Progress Update
Projects funded
for a further year
until 2023 by the
ADP
Deliver ADP funded RRTP projects in
partnership with Barnardo’s: 
• Family Plus (families and children
impacted by substance use and
trauma)
• Youth Life Coach (care experienced
young people at risk of substance
use)
• Creative Faces (care experienced
young people at risk of substance
use)
2023 RRTP Team/
Barnardo's
Projects continue to
be delivered and
have received
confirmation of
funding to 2026.
KEY ACTION 4.3 
Consider how
Mental Health
Services can be
redesigned to meet
the needs of
homeless
households with
most complex needs 
Mental Health
Strategy for
Lanarkshire
implemented
and senior
social worker
post integrated
within the
Housing First
Team to
improve
pathways
Review and refresh pathway between
Housing, Homelessness Service and Mental
Health Services 
2023 RRTP Team  Not commenced yet.
KEY ACTION 4.4 
Develop Housing
Contribution
Statement (HCS) as
part of the new
Strategic
Commissioning Plan
(SCP) for 2023-2026
Existing HCS in
place for current
SCP (2020-
2023)
Ensure HCS and SCP alignment and
commitment to RRTP objectives
2023 Business
Development
and Support
SCP for 2023/2026
period incorporating
HCS published in
April 2023.
Page 34 of 196

Page 35

Action Baseline 2022 Milestones Timescale Lead  Progress Update
KEY ACTION 4.5 
Review exclusion
processes and
strategies for
engaging with clients
with complex needs
Guidance/
procedures in
the 
process of being
developed
Develop and implement clear guidance and
supports for supported accommodation staff
and partner providers to reduce exclusions
and identify alternative options to improve
outcomes for those with complex needs
2022 Business
Development
and Support
Procedures
developed.
KEY ACTION 4.6 
Explore
development of new
supports and
services to meet the
needs of people with
complex needs for
whom Housing First
may not be suitable
Funding
secured by Blue
Triangle
Housing
Association to
deliver ‘test of
change’ Tenant
Guarantor
Model
Develop and implement Tenant Guarantor
Model
2023 Business
Development
and
Support/Blue
Triangle
New service
implemented.
KEY ACTION 4.7 
Continue to explore
the development of
new supports for
people with complex
needs to compliment
the existing supports
and services
available
- Explore implementation of peer support
across Housing First and wider services
2023 RRTP Team Homeless Network
Scotland delivered 4
half day sessions
with HF Staff &
service users on
peer
support/mentoring –
and part time peer
mentor post
implemented.
KEY ACTION 4.8 
Continue to
implement trauma-
informed practice,
Post in process
of recruitment
Recruit trauma-informed coordinator as part
of the council’s wider plans to improve
trauma-informed approaches across services
and partners 
2022 Health and
Social Care
Coordinator
recruited and in
post. 
Page 35 of 196

Page 36

Action Baseline 2022 Milestones Timescale Lead  Progress Update
services and
systems 
Solihull training
delivered to
some housing
staff and
trauma-informed
training e-
learning
developed
Roll out trauma-informed training to all
housing services staff with enhanced training
for staff in roles with increased contact with
clients with complex needs
2024 Business
Support and
Development
Training plan
underway.
- Carry out trauma-informed walk-throughs
focusing on specific priority areas to identify
steps required to ensure trauma-informed
environments, services and informed 
2024 Business
Support and
Development 
Page 36 of 196

Page 37

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref: SL/GG Date 08/11/23 
Community Safety Hub – Mobile CCTV Provision 
From  Stephen Llewellyn, Chief Officer (Housing Management)  
E-mail llewellyns@northlan.gov.uk Telephone 01698 274162 
1. Background 
1.1 At the May 2023 Housing Committee the use of Mobile CCTV Vehicles in North
Lanarkshire was discussed, and a request received for more information in the form of
a committee report. An update on technologies that the authority will continue to
investigate as solutions to provide a flexible approach to CCTV deployment will also be
covered. 
1.2 The Plan for North Lanarkshire aims to make North Lanarkshire a better place to live,
work and visit, where homes and public spaces are safe and feel safe for everyone.
Improving Community Safety through CCTV to tackle Crime and Anti-social Behaviour. 
Utilising technology to assist in the development and ongoing improvement of
resources to facilitate the changing requirements of camera deployments. 
Executive Summary 
The purpose of this report is to update Committee in relation to the use of Mobile CCTV
vehicles within North Lanarkshire Council. 
Various options have been considered in the past, however recent developments in the
industry have resulted in an alternative mobile CCTV solution that is not vehicle mounted
and does not require the same resource to be deployed in areas where temporary CCTV
solutions would be beneficial. 
Recommendations
It is recommended that the Housing Committee 
1) Acknowledge the content of this report and recognise the ongoing positive impact
delivery of this service has on the communities of North Lanarkshire. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (14) Ensure the highest standards of public protection
Programme of Work Transforming Places
Item 3
Page 37 of 196

Page 38

2. Report 
2.1 The community safety team, responsible for the CCTV infrastructure throughout the
public space areas in North Lanarkshire, have previously investigated the costs and
options around the procurement and utilisation of mobile CCTV vehicle-based
solutions.  To date there have been several reasons why this type of technology has
not been procured.   
2.2 Consideration was given to not only the procurement cost of having a vehicle supplied,
but also the subsequent cost to have the CCTV equipment installed within the vehicle
and the additional power resource required.  The capital expenditure would be
considerable to have the vehicle made available and thereafter the ongoing
maintenance costs and life cycle of the vehicle were all considerations. 
2.3 In order to provide some form of solution to the CCTV requirements that are flexible,
cost effective and relatively quick to install, mobile telephony based 4G CCTV cameras
have been available within the community safety team for several years.  These
cameras can be mounted onto street lighting columns and are deemed to be re-
deployable CCTV cameras that can respond to particular issues.  The one main issue
however remains that these cameras require a 24/7 power supply. 
2.4 Through market awareness and engagement a new device in the form of a towable
trailer unit has come to the market and features the same 4G technology we are
currently utilising combined with the ability to self-power for a period of over three
weeks.  The device consists of long-life batteries and Photo-Voltaic (PV) panels to keep
the batteries topped up to provide some self-charging to allow the device to remain
deployed longer than battery power alone. 
2.5 The device features a fully functional Pan Tilt and Zoom (PTZ) camera that can be used
to track activity and there is a further static camera that covers the entire trailer unit to
protect against vandalism and unauthorised access to the device.  Furthermore, the
device has a vibration sensor fitted which activates an alarm within the CCTV control
room to alert monitoring staff to persons potentially interfering with the device. 
2.6 Initial testing has resulted in the unit being deployed and running self-powered for a
period of around 4 weeks.  During this period the device has had testing of the alarm
modules and also performance of the camera while deployed at full extension of the
telescopic mast.  The camera is deployed at a height of between 6 and 7 meters and
has been stable for the entire period.   
2.7 There are several areas already identified that could benefit from the deployment of the
mobile CCTV unit as a means to assess if permanent CCTV is required and also to
combat increasing and ongoing Anti-social behaviour, youth disorder and criminal
issues.  It is intended that a four-week deployment at each location will allow for 12
deployments per annum. 
2.8 The unit requires a full overnight recharge to fully condition the batteries prior to
deployment and once it has been taken to site can be set up in less that two hours. 
This makes the device a truly redeployable resource that can quickly and efficiently be
moved between locations.  Image 1 below shows the camera deployed within
Strathclyde Park and Image 2 shows an image taken from the camera to show the
image quality from the PTZ camera. 
2.9 Further to the device being flexible in terms of deployment opportunities, the device
can be monitored remotely meaning that there is no additional resource requirement to
remotely operate the camera.  As no staff will be left on site with the unit it makes it less
resource intensive and removes any staff from being deployed in potentially hostile Page 38 of 196

Page 39

areas.  The camera will be deployed early in the day to remove risk from anyone
interfering during the setup period. 
2.10 Deployment of the device will be undertaken by the termed contractor for the CCTV
and related service contract in line with current deployable camera installations. 
Image 1 – Photograph of Trailer deployed at Strathclyde Park. 
Page 39 of 196

Page 40

Image 2 – taken from the camera mounted on trailer.   
3. Measures of success 
3.1  In order to measure the success of the device, areas that are currently experiencing
Anti-social issues, youth disorder or criminality will be monitored to establish if
deployment has resulted in a reduction of these types of activities along with any
incidents being recorded and reported that are detected on the unit. 
3.2 It is anticipated that the unit will allow assessment of areas where permanent CCTV
installations are being requested.  This will allow for investment in areas most in need
of permanent CCTV solutions. 
3.3 Should the trailer mounted solution prove to be extremely successful, there is potential
within the operating software to have additional units deployed and monitored for alarm
activity and CCTV use on the same system moving forward therefore we could
potentially add to the number of these devices without any restrictions from the
operating systems point of view. 
4. Supporting documentation 
4.1 None 
Stephen Llewellyn
Chief Officer (Housing Management)  Page 40 of 196

Page 41

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☒ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Page 41 of 196

Page 42

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 42 of 196

Page 43

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref:  CB/CR Date 08/11/23 
Transforming Places - Tower Strategy Update 
From  Brian Lafferty, Chief Officer (Housing Property Services) 
Email barrca@northlan.gov.uk  Telephone 07583097785 
Executive Summary
The purpose of this report is to update Committee on current progress relating to the Tower
Strategy, which sits within the Transforming Places Programme of Work, and key
achievements in the last reporting period. 
The report also provides advance notice to Committee of projects which are at risk of
significant delay and projected overspends. 
Recommendations
It is recommended that the Housing Committee: 
1) Acknowledge the progress of the tower demolition programme (Ambition) 
2) Acknowledge the progress of the sprinkler installation & fire safety programme 
3) Acknowledge the progress of major refurbishment projects 
4) Acknowledge in sections 2.1.3 and 2.1.5 the anticipated overspends that are
expected on the contracts listed and that a formal overspend report will be presented
to a future committee and; 
5) Acknowledge the planned measures that the Service will put in place to mitigate
future unpredictable, increased costs on demolition contracts.
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth
Programme of Work Transforming Places
Item 4
Page 43 of 196

Page 44

1. Background 
1.1 Committee will be aware that in 2017 as part of the HRA budget motion, the council
announced its intention to commence consultation with stakeholders regarding the
potential re-provisioning of its tower estate over the next 25 years, with phase 1 of the
re-provisioning programme granted committee approval in May 2018.  Subsequently
approval was given at May 2023 Housing Committee to commence the Phase 2 re-
provisioning consultation.  Significant progress has been made to date with several
high/low-rise blocks now demolished. 
1.2 Committee will also recall that in February 2018, the council approved proposals to
develop and deliver a programme to introduce enhanced fire safety measures within
high-rise towers that included retrofitting of sprinkler systems, improved fire
compartmentation, emergency lighting and installation of fire-doors to properties. 
1.3 Following committee approval in 2016 to undertake condition surveys including external
cladding assessment, internal fabric condition and structural integrity, the findings have
now been assessed with a strategic approach to remedial action in line with
government legislation developed.   
2. Report 
2.1 Demolition/Ambition 
2.1.1 The programme is progressing on schedule with 1656 from 1750 properties identified
within phase 1 having been made vacant, although 200 have subsequently been re-
purposed to support the Ukraine resettlement programme. Following extensive
negotiation with private owners, only one now remains in-situ with the council exploring
all options for purchase. Detailed breakdown of the phase one programme as of
September 2023 is provided in table 1: 
Table 1
Tower Vacant Properties Status
Northburn Low-Rise, Airdrie 27 (100%) Complete
Holehills, Airdrie 138 (100%) Complete
Burnside Court, Coatbridge 44 (100%) Complete
Gowkthrapple Low-Rise 303 (99%) On Site
Shawhead Low-Rise  176 (100%) On Site
Coursington High-Rise 351 (100%) On Site
Jackson High-Rise 192 (100%)  On Site
Allershaw High-rise 41 (58%) Design Phase
Dunbeth High-rise 130 (70%) Re-programmed
High Coats  165 (86%) Re-programmed
Birkshaw High-rise 89 (94%) Re-programmed        
2.1.2 The contract to demolish the 19 low-rise blocks at Gowkthrapple, Wishaw was awarded
in February 2023 and the contractor took possession in March 2023.  Works are
progressing well, although one private owner remains present, and negotiations are
ongoing to purchase the property.   
Page 44 of 196

Page 45

2.1.3 The contract to demolish 11no low-rise blocks at Shawhead, Coatbridge continues, and
a new haulage road aimed at reducing traffic congestion in nearby streets is complete
and in use. Unfortunately, the contract has experienced delays due to contractor
performance and service disconnections which the council delivery team are managing
in accordance with the contract conditions.  It is anticipated that the additional work
required to complete the demolition will result in a delay to the project completion and
additional costs resulting in an overspend.  
2.1.4 Demolition of the three high-rise tower blocks at Coursington, Motherwell has
commenced with demolition of 12-14 Draffen street and surrounding structures. Careful
deconstruction of the tower superstructures is in progress with mast-climbers in
operation. Nearby residents are being notified of ongoing works. There have been
significant levels of previously unknown asbestos found within the structure.  This
coupled with delays caused by Scottish Power Energy Networks (SPEN) redirecting
existing sub-stations located within the footprint of each tower has caused a substantial
delay and is likely to result in an overspend on the contract.  Further updates on the
anticipated impacts of these issues will be reported to a future committee. 
2.1.5 The contract to demolish Jackson Court, Coatbridge has been awarded with soft strip
ongoing. This will be a landmark demolition project within the programme and will
transform the surrounding area.  Although the project is progressing well and is on
programme, an overspend is projected, primarily due to the levels of textured coatings
that have been identified and the level of property clean ups that were required before
the building can be soft stripped.   
2.1.6 The consultation for the second phase of the demolition programme was recently
completed by the tenants located in each property put forward for reprovisioning. In its
current form the programme contains a mixture of low-rise and tower blocks spanning
several years. A report on the findings of the consultation exercise was approved at the
Housing Committee in August 2023. 
2.1.7 High Coats and Birkshaw Tower remain part of the phase 1 demolition programme with
proposed dates for demolition to be confirmed in due course. Details of repurposing of
these towers are noted under section 2.4.3. 
2.2 Phase 1 Demolition Programme – Risk Update 
2.2.1 As highlighted in sections 2.1.3 to 2.1.5 the demolition contracts at Coursington
Towers, Shawhead low rise blocks and Jackson Court are currently behind programme
and projecting overspends.   
2.2.2  Refurbishment & Demolition (R&D) asbestos surveys (formerly type 3 asbestos surveys)
are required as part of the normal demolition process.  On occasion the client will
decide which stage to request or include them, e.g. pre-tender or post tender, with value
for money being always required via tendered rates as the basis for checking.    
2.2.3   A contingency or provisional sum is allowed for as standard to cover these costs based
on the information the client holds. To date, the Council have included asbestos surveys
post tender award to save costs on security and reduce potential vandalism and
antisocial behaviour, avoiding having buildings sitting vacant for longer periods of time
while destructive surveys and tendering processes are undertaken.  This approach was
successful on the earlier demolition contracts in the phase 1 programme. 
2.2.4 In regard to the demolition of Coursington, Allan and Draffen Towers in
Motherwell.  The contract award was £1.9m.  Within the contract an allowance was
Page 45 of 196

Page 46

made for asbestos removal that the Council had records of to be removed.  In addition,
there was a further amount in place for the removal of unrecorded asbestos as a
provisional sum in the tender.   
2.2.5 As the contract progresses it has become apparent that there are significant levels of
asbestos located in areas that have not been surveyed, specifically in the
superstructure between the existing external facade and cladding and also common
room areas, which must be removed by a licenced asbestos contractor. These areas
have not been part of any disruptive work in the past hence not recorded as containing
asbestos. The costs associated with this activity are still to be finalised. It should be
noted that, whilst this will result in an overspend on the contract, the costs associated
with the removal of the asbestos are unavoidable and would have had to be borne by
the Council if the level of asbestos was known at contract award stage.    
2.2.6  In addition to the asbestos removal activities, a further unplanned spend event has
been identified in relation to service disconnection works required for the demolition to
take place.  Within each of the three towers, there is a sub-station to service the tower,
which can be the case from time to time.   Although there was an awareness of the
sub-stations being in situ, the service drawings obtained did not reflect these were also
connected into the local grid to provide additional capacity for the network infrastructure
in the area.  This information only came to light when the demolition contractor
commenced the disconnection process and started to engage with Scottish Power
Energy Networks (SPEN).   
2.2.7 Although this was identified at a relatively early stage, progress with the redirection of
the services and re-provisioning of a new sub-station within the site only recently
commenced, primarily due to extended timescales being apparent with SPEN to
progress this issue.  The additional time to undertake these service redirection works
resulted in the need to instruct a protective structure over the sub-station at Coursington
Tower to allow the demolition works to progress. 
2.2.8 Due to the additional unrecorded asbestos having to be removed by a licensed
asbestos contractor combined with the additional preparatory works to enable SPEN to
complete their service relocation works, the allowances and contingency included in
the contract is not large enough to accommodate these additional works.  It is therefore
anticipated that a report will be presented to a future committee highlighting an
overspend on this contract which will be managed within the overall budget for the
capital plan.   
2.2.9  With regard to the demolition of Shawhead low rise blocks in Coatbridge, on 23th May
2022 a contract was awarded for the demolition of 11 low rise blocks at the so called
“Shawhead back flats” in Coatbridge.  The contract award sum was £646k.  Within the
contract an allowance was made for asbestos removal that the Council held records
of.  In addition, there was a further sum in place for the removal of unrecorded asbestos
as a provisional sum in the tender.   
2.2.10 As the contract progresses it has become apparent that there are significant levels of
asbestos located in areas that have not been surveyed, specifically in the walls and
ceilings and hidden boxed in areas, which must be removed by a licenced asbestos
contractor. These areas have not been part of any disruptive work in the past hence
not recorded as containing asbestos. Furthermore, there has been unrecorded thermal
upgrade works undertaken in the past to the interior spaces of the blocks primarily
insulated plasterboard to concrete walls. This had to be removed and the insulation
manually separated before removal from site which is a significant task. The costs
Page 46 of 196

Page 47

associated with these additional elements are still to be finalised. It should be noted
that, whilst this will result in an overspend on the contract, the costs associated with the
removal of the asbestos are unavoidable and would have had to be borne by the
Council if the level of asbestos was known at contract award stage. 
2.2.11 The contract at Jackson Court was awarded for £1.29m with a further sum set aside as
a specific contingency to remove any unrecorded asbestos. As work progresses it has
become apparent that there are increased levels of asbestos.  The costs associated
with these additional elements are still to be finalised. It should be noted that, whilst this
will result in an overspend on the contract, the costs associated with the removal of the
asbestos are unavoidable and would have had to be borne by the Council if the level
of asbestos was known at contract award stage. 
2.2.12 Due to the unrecorded asbestos having to be removed by a licensed asbestos
contractor the allowances and contingency included in the contract is not large enough
to accommodate these additional works.  It is therefore anticipated that a report will be
presented to a future committee highlighting an overspend on this contract which will
be managed within the overall budget for the capital plan.
2.3 Mitigation 
2.3.1 In advance of all future contracts being tendered for demolition, the stage at which the
R&D asbestos surveys will be undertaken will be brought forward to the pre-tender
stage.  This will entail a contract being procured and undertaken in advance of the
demolition contract being tendered, and the resulting report included in the tender
documents. This new approach will ensure that the majority of costs associated with
the removal of asbestos will be included in the contract and priced as part of the tender
return.  This will result in a delay between the block being vacated and the demolition
contractor taking possession of the site.   
It should be noted that there may be some instances where the R&D survey doesn’t
identify all areas of asbestos, however there will be a small sum included in future
tenders which will allow for this scenario. 
2.3.2 In order to mitigate the potential time and cost risks associated with the sub-station
redirection activities that may be required in futures tower to be demolished as part of
the Tower Strategy works, a list of all towers was sent to SPEN with a request for all
sub-station information to be provided.  This information will be included in future
tenders for demolition contracts. 
2.4 Next Steps 
2.4.1 As the costs associated with the removal of existing asbestos are unavoidable, it will
be the case moving forward that all demolition contracts will have full R&D asbestos
survey information included.   
This approach will not provide a cost avoidance position as the costs for the removal
of the material would need to be met by the Council but will allow for more budget/ cost
certainty in future contracts.   
2.4.3 As the additional surveys will require more time between the last tenant vacating the
property and the demolition commencing, it does mean that the potential for anti-social
behaviour or access to the blocks for other reasons increases in likelihood.  It is
Page 47 of 196

Page 48

therefore proposed that enhanced security measures are put in place for this additional
timescale and potential cost.  Where possible advanced survey activities will be carried
out on fully vacant floors of occupied towers to reduce the amount of time between the
tower being fully vacated and the demolition contractor taking possession of the site. 
2.4.4 It should be noted that the proposed changes in 2.3 will reduce the identified risk to
increased costs but will not remove it completely. The nature of demolition works to
residential buildings of this age with limited historical records mean we are unable to
plan for every eventuality. Contingencies and provisional sums allowed for in the
contract should cover the majority of unplanned spend. 
2.5 Sprinkler / Fire Safety Programme 
2.5.1 Phase 1 of the sprinkler installation programme at Burnside, Lodge & Doonside Tower,
Motherwell has now reached practical completion with snagging works ongoing. 
2.5.2 Phase 2 of the sprinkler installation programme comprising of towers at Glassford,
Woodside, Glen, Coltswood & Redbridge are currently in progress. 
2.5.3 Phase 3 of the sprinkler installation programme is currently being developed and will
be undertaken in 2024/25 
2.5.4 The fire safety programme which includes installation of emergency lighting, fire-doors
to properties and improved compartmentation/fire-stopping is complete. In line with
recent change in legislation, interlinked smoke detection has also been installed within
properties. 
2.5.5 A contract to remove all spandrel panels to stairwells in 13 towers (recommendation
following the Grenfell report) is also complete. 
2.6 Major Refurbishment Projects 
2.6.1 Refurbishment of the tower blocks at Blairgrove/Merryston (Lot 1) and Glen/Millbrae
(Lot 2) is complete, snagging works continue. 
2.6.2 Specialist consultants have now been appointed to provide design services in relation
to the recladding and internal refurbishment of Whifflet and Calder towers, Coatbridge. 
2.6.3 In order to support displaced citizens affected by the war in Ukraine, North Lanarkshire
Council committed to reinstate circa 200 properties on a temporary basis. The
properties, located within tower blocks in Coatbridge (High Coats) and Wishaw
(Gowkthrapple) now have 200 families in residence. 
3. Measures of success 
3.1 The plans contained within this report will help to improve housing conditions and
housing choice for our residents which contributes to addressing inequality.       
4. Supporting documentation 
4.1 Not applicable.
Page 48 of 196

Page 49

Brian Lafferty                   
Chief Officer (Housing Property Services)     
Page 49 of 196

Page 50

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?   
Any financial impact of the measures implemented will be contained within the
HRA Capital Investment budget and will be drawn down via borrowing/CFCR as
required and reported to committee. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Statutory compliance with Building Standards and recent fire safety legislation. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Page 50 of 196

Page 51

Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Upgrading of external building fabric to current energy standards.   
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Reprovisioning of towers and low-rise blocks must be included in regular corporate
communications. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Risks are considered, frequently reviewed and recorded on project-specific risk
registers. Risks with an inherently high score are escalated to project board/service
level.   
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these?
Page 51 of 196

Page 52

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 52 of 196

Page 53

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref:  CB/BL Date 08/11/23 
Non-Traditional House Types - Update 
From  Brian Lafferty, Chief Officer (Housing Property Services) 
Email barrca@northlan.gov.uk  Telephone 07583097785 
Executive Summary 
The purpose of this report is to update Committee on the progress with the upgrading of
some of the “non-traditional” housing stock located across the authority, specifically in
relation to works undertaken or planned in the British Iron & Steele Federation (BISF)
properties and the Swedish Timber style houses. 
This update also responds to a motion which was put forward at a previous full Council
committee in March 2022. 
Recommendations
It is recommended that the Housing Committee 
1) Acknowledge the progress made in relation to the installation of external wall
insulation (EWI) at the BISF properties across the authority. 
2) Acknowledge that £2.45m of external funding has been brought into the council to
support the BISF upgrade programme. 
3) Acknowledge the progress of the pilot works to 4 Swedish Timber houses, and the
programme which will follow in future years which will upgrade all remaining timber
clad properties. 
4) Acknowledge the proposal that further external funding applications will be
submitted which will aim to further support the council in the delivery of energy
efficient projects and programmes. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth
Programme of Work Sustainable Futures
Item 5
Page 53 of 196

Page 54

1. Background 
1.1 The following report provides a response to the motion which was tabled at the full
Council committee in March 2022.   
1.2 Following approval of the motion it was decided: 
(i) that the commencement of design works to non-traditional house types such as
BISF and the delay in the pilot programme for different timber clad properties such
as Swedish Timber houses be acknowledged;
(ii) that it be noted that residents had raised a number of concerns regarding these
properties, particularly in relation to their appearance and poor insulation.
(iii) that the structural surveys be completed as a matter of urgency, in all non-traditional
housing stock, to identify whether homes are suitable to progress, or other
alternative solutions require to be sought, and
(iv) that a report be submitted to a future meeting of the Housing and Regeneration
Committee on the resource and cost implications of significantly reducing the
timescale for delivering the analysis for this 
1.3 Points (i) and (ii) in section 1.2 are acknowledged and noted respectively.   
1.4   An update in respect of points (iii) and (iv) is provided within section 2 of the report. 
2. Report 
2.1 BISF Property Upgrades 
2.1.1 Within its housing stock the council currently has 257 BISF properties.  These non-
traditional construction homes were earmarked for EWI to be installed as part of a
programme within the 22/23 and beyond capital plan(s).   
2.1.2 Since the commencement of the EWI programme to the BISF properties 189 have had
upgrades completed.  The remaining BISF properties will have EWI installed within the
23/24 capital programme.   
2.1.3   In response to items (iii) and (iv) of the motion, it should be noted that structural surveys
are carried out in advance of any design work commencing for each property.  These
surveys, and resulting reports, are completed in line with the planned programme of
works. Acceleration of the survey programme and delivery of the upgrades is limited to
annualised budget availability and existing contract capacity. 
2.1.4 The costs associated with completing the programme of EWI works to BISF properties
is projected to be £7.00m, with £4.48m spent in 2022/23, however Housing Property &
Projects have been successful in obtaining external funding of £2.45m from the Social
Housing Net Zero Fund to support the project, reducing the overall costs to the council
for the delivery of the programme by the same amount. 
2.2 Swedish Timber Improvements 
2.2.1 As part of the wider programme to upgrade and improve the thermal efficiency in all
non-traditional homes, a pilot project has been developed which will upgrade four
Page 54 of 196

Page 55

Swedish style timber homes. On successful completion of the pilot a programme to
upgrade the remaining 71 Swedish timber houses across the authority will be prepared. 
2.2.2  It is appreciated the pilot has taken longer than anticipated to commence. This is
primarily due to the need to ensure that the aesthetics of each building are maintained
as part of the design to improve the overall thermal efficiency of each property.  Also,
as it would be the Service’s intention to submit an external funding application to bring
in further support for the delivery of the project (and potentially wider programme), the
start dates must align with the decision on the funding application being received.    
2.2.3   A feasibility design proposal has been approved for the pilot scheme, and detailed
designs are now being prepared.  It is anticipated the designs will be complete
imminently, with tenders issued for pricing soon thereafter, to enable the works to
commence early in 2024/25. The funding application, which includes detailed cost
proposals and designs will be submitted in January 2024, with a decision expected in
March 2024.  
2.3 Other Non-Traditional House Types 
2.3.1 In addition to the BISF and Swedish Timber properties which are classified as non-
traditional, there are also additional properties which have the same   
classification. Following completion of the works to the BISF and Swedish Timber 
properties, upgrades to these properties will also be undertaken on a programmed 
basis. It is estimated that the programme to carry out thermal improvement works 
in these homes will be complete within the next 2-3 years. 
3. Measures of success 
3.1 The plans contained within this report will help to improve housing conditions and
housing choice for our residents which contributes to addressing inequality.       
4. Other supporting Documents 
4.1 Notices of Motion Received in Accordance with Standing Order 23 Which Will Appear
on the Agenda for the Meeting of the Council to be Held on 31 March 2022 
Brian Lafferty                   
Chief Officer (Housing Property Services)     
Page 55 of 196

Page 56

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?   
Any financial impact of the measures implemented will be contained within the
HRA Capital Investment budget and will be drawn down via borrowing/CFCR as
required and reported to committee. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Statutory compliance with Building Standards and recent fire safety legislation. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Page 56 of 196

Page 57

Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Upgrading of external building fabric to current energy standards.   
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Reprovisioning of towers and low-rise blocks must be included in regular corporate
communications. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Risks are considered, frequently reviewed and recorded on project-specific risk
registers. Risks with an inherently high score are escalated to project board/service
level.   
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these?
Page 57 of 196

Page 58

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 58 of 196

Page 59

North Lanarkshire Council
Report
Housing Committee
Does this report require to be approved? ☐ Yes   ☒ No
Ref    BL/MH/AC Date 08/11/23
Preservation Works Report 2022/23 and 2023/24 YTD  
From Brian Lafferty, Chief Officer, Housing Property Services
E-mail HendryM@northlan.gov.uk Telephone Michelle Hendry,
07960974797
1. Background
1.1 There are different types of preservation which consist of the following forms;
Condensation, this is the most common form of unwanted dampness in properties
and occurs when warm moist air comes into contact with a cold surface. Air can
contain varying amounts of water vapour; warm air can hold more water vapour than
cold air. When warm air comes into contact with a colder surface, it cools down and
can’t retain the same amount of water vapour and presents itself as moisture or water
on surfaces such as window cills. If not managed by the householder/tenant can cause
mould, mildew or fungus.
Executive Summary
The purpose of this report is to provide committee with an update on North Lanarkshire
Council housing repairs which relate to preservation works, this is for the period 2022/23
and 2023/24 up to 31 August 2023.
The report is also in relation to a motion passed at full council meeting on 15 December
2022.
Recommendations
It is recommended that the Housing Committee:
(1) Acknowledge the report and its findings with relation to preservation related works.
The Plan for North Lanarkshire
Priority Improve North Lanarkshire's resource base
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth
Programme of Work Transforming Places
Item 6
Page 59 of 196

Page 60

Rising damp, this affects the walls of the properties and is predominantly within
ground floor properties where moisture from the ground travels up through the walls.
This mainly occurs where there is debris in the wall cavity or subfloor void, internal or
external renders / plasters overlapping the DPC, external ground levels being raised
above the DPC, inappropriate insulation material in the cavity, intersecting masonry
structures / abutting garden walls.
Wet/dry rot, there are different types of fungal decay that affects the timber surfaces.
The main difference is that wet rot likes to grow on timber with a high moisture content
of over 50% and can be caused by defects to plumbing, guttering and leaking roofs
and on occasion can cause condensation to appear. On the other hand, dry rot likes
to grow at a lower moisture content of around 20-30% and can spread over a relatively
dry timber if the humidity is right. It can also result in an insect infestation such as
woodworm should the correct conditions prevail, the insects have laid their eggs in the
timber. 
2. Report
2.1 Housing related preservation works.
2.1.1 It should be noted that during 2022/23 that 1586 properties reported issues relating to
condensation. The value of the works was £271,937.63, It should be noted that within
2023/24 which is up to 31 August 2023 that there have been 671 properties reporting
condensation. The value of the works was £166,452.74.
2.1.2 It should be noted that during 2022/23 that 13 properties reported issues relating to
rising damp. The value of the works was £33,288.22, It should be noted that within
2023/24 which is up to 31 August 2023 that there have been 10 properties reporting
rising damp. The value of the works was £20,261.78.
2.1.3  It should be noted that during 2022/23 that 233 properties reported issues relating to
rotworks which can be either be wet or dry rot or insect infestation. The value of the
works was £1,079,387.48. It should be noted that within 2023/24 which is up to 31
August 2023 that there have been 109 properties reporting rotworks. The value of the
works was £515,087.17.
2.1.4 With regards to surveys we also progressed preservation works. Within 2022/23 we
progressed 596 surveys at a value of £86,882.03 and within 2023/24 which is up to 31
August 2023 we have progressed 226 surveys at a value of £30,261.78, these surveys
will have led to some of the work being carried out.
2.1.5   Table 1 references the information noted from 2.1.1 to 2.1.4.
Table 1
2022-2023 2023-2024 (YTD 31.08.2023)
No of
Properties
Value No of
Properties
Value
Page 60 of 196

Page 61

Condensation 1586 £271,937.63 671 £166,452.74
Rising Damp 13 £33,288.22 10 £20,289.99
Wet/Dry Rot
(Rotworks)
233 £1,079,387.48 109 £515,087.17
Surveys Issued 596 £86,882.03 226 £30,261.78
Total * this
excludes surveys
£1,471,495.36 £732,091.68
2.1.6 As noted within 1.1 condensation is the main form of enquires from North Lanarkshire
Council properties where any identified works are processed and actioned. As
referenced within Table 1 there were 1586 properties within 2022/23 where
condensation was noted as the cause of works this is in comparison to 13 properties
for rising damp (0.8%) and 233 properties for rotworks (14%) this equates to 85%
relating to condensation issues. 
2.1.7 In reference to 2023/24 YTD up to 31 August 2023 there were 671 properties within
where condensation was noted as the cause of works this is in comparison to 10
properties for rising damp (1.5%) and 109 properties for rotworks (16%) this equates
to 82.5% relating to condensation issues.
2.1.8 It should be noted that advice and support is also given to tenants on how to reduce
condensation within the home and further advice is also provided via North Lanarkshire
Council website this can be accessed via Avoiding condensation | North Lanarkshire
Council.
3. Measures of success
3.1 An annual review and appropriate action as issues arise and submission of an annual
report to cycle 2 Housing committee will be a measure for success in terms of
governance and accountability.
4.
4.1
Supporting documentation
Not applicable.
Brian Lafferty
Chief Officer (Housing Property Services)
Page 61 of 196

Page 62

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 62 of 196

Page 63

Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles
from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 63 of 196

Page 64

Page 64 of 196

Page 65

North Lanarkshire Council
Report
Housing Committee
Does this report require to be approved? ☒ Yes   ☐ No
Ref    BL/MH/IP Date 08/11/23
Housing Repairs and Maintenance – Debt Recovery and
Administration Fees  
From Brian Lafferty, Chief Officer (Housing Property Services)
E-mail laffertyb@northlan.gov.uk Telephone
Michelle Hendry, Repairs
& Maintenance Manager –
07960 974797
1. Background
1.1 The Housing Repairs and Maintenance Service has, for a variety of reasons, a
requirement to issue Debtors accounts to both council tenants and owner occupiers
(often for communal maintenance required to multiple tenure properties). These
accounts, including the administration fee, have generated an average income to the
Housing Revenue Account of £343,000 per year.
Executive Summary
The purpose of this report is to update Committee on the current volume of debtors’
accounts being issued to tenants and owner occupiers by the service, and to seek approval
to amend the historical application of an administration fee, based solely on the value of
the invoice.
Recommendations
It is recommended that the Housing Committee
1) Acknowledge the volume, variety and level of income generated by the accounts
currently being issued by the service.
2) Approve, from 1 April 2024, the proposal to amend the historical policy of a tiered
application of administration fee, based on value of invoice, to a simplified and fairer
fee, more reflective of the work involved in the production of the invoice.
The Plan for North Lanarkshire
Priority Improve economic opportunities and outcomes
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth
Programme of Work Transforming Places
Item 7
Page 65 of 196

Page 66

1.2 Accounts to council tenants tend to be for items such as, tenant damage, lock
change following lost keys or works required prior to a change of tenancy.
1.3 An historical approach, of applying an administration fee to every account raised, based
on the value of the invoice, continues to be policy. See link to report dated 15 January
1996, refer to section 8.1 - att49829.pdf (northlanarkshire.gov.uk) . This fee ranges from
£5.00 to £20.00 and, for 2022/23 generated £70,000 of the £343,000 overall income.
I.e., actual invoice value of £273,000, with applied administration fees of £70,000.
2. Report
2.1 The purpose of this report is to amend the current policy and inconsistent application
of an administration fee when issuing accounts to tenants and owner occupiers.
2.2 Prior to preparing this report 13 other Scottish Local Authorities were contacted to
establish what is common practice within the North Lanarkshire Council peer group. Of
the 8 that responded, it became apparent, each Local Authority has their own policy
and process. A percentage application was a recurring feature however, ranging from
5% to 15% of invoice value. There is also a theme of this administration fee being
capped at a maximum of £50.00.
2.3 The average value for accounts for 2021/22 were approximately £129 per account.
For 2022/23 the average account was approximately £157 per account.
2.4 Within the Repairs and Maintenance team, there are currently two members of staff
who spend the majority of their time working on the calculation, preparation and issue
of debtors’ accounts. In order to ensure that the integrity of the Housing Revenue
Account is maintained, the administration fee applied should accurately reflect the costs
involved. In addition, the service is required to review charges to ensure full cost
recovery can be attained in line with the Council’s Revenue Resources Budget
Strategy. This revised approach ensures the service can comply with that strategy. 
As the work content is the same irrespective of invoice value, it is proposed that for all
invoices raised, a flat administration fee of £20.00 is applied. This would achieve a
degree of consistency within the Service, and proportionally increase the level of
income to the Housing Revenue Account. There is no requirement to apply the
additional £50.00 for implementing a payment plan.
It is suggested that the new rate becomes applicable from 1 April 2024.
2.5 If approved, this new rate would generate additional income to the Housing Revenue
Account. Based on 2022/23 accounts, a further £30,000 is likely to be realised which
will ensure full recovery of the administration costs associated with these types of work
and ensure they’re not subsidised by housing tenants. 
2.6 Officers from both North Lanarkshire Council Legal Services and Corporate Finance
Teams were involved in discussions relating to this report and were satisfied the
suggested amendments would have no legal constraints or financial implications.
3. Measures of success
Page 66 of 196

Page 67

The administration fee applied to repairs and maintenance invoices issued by the
service will more accurately reflect the costs incurred and will achieve some
consistency with the approach applied by other local authorities.
4. Supporting documentation
4.1 Not applicable.
Brian Lafferty 
Chief Officer (Housing Property Services)
Page 67 of 196

Page 68

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The increased income generated by the change in policy is likely to be available to
further maintain protect current housing stock.  
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐ 
5.6  Technology / Digital impact
Page 68 of 196

Page 69

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Risk is recorded on the Service Risk Register and managed accordingly. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 69 of 196

Page 70

Page 70 of 196

Page 71

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    SL/TH Date 08/11/23 
Tenant Satisfaction Survey 2023 
From  Stephen Llewellyn, Chief Officer (Housing Management)  
E-mail llewellyns@northlan.gov.uk Telephone 01698 274192 
1. Background 
1.1 The Housing (Scotland) Act 2010 and the Scottish Social Housing Charter (SSHC)
introduced an obligation on landlords to regularly undertake surveys of their tenants
and submit the resultant data to the Scottish Housing Regulator (SHR). 
1.2 As a landlord we are required to submit our tenant satisfaction data in the Annual
Return on the Charter (ARC) by 31 May each year. 
1.3 The SHR expects landlords to carry out a survey of tenants at least once every three
years. Traditionally we have opted for a biennial survey, with the exception made during
the covid pandemic, where the survey was delayed until 2021. 
Executive Summary
The purpose of this report is to update committee on the results of the recent tenant
satisfaction survey 2023.  The survey covers satisfaction indicators across Housing
Solutions and Housing Property and Projects. 
Recommendations
It is recommended that the Housing Committee: 
1) Acknowledge the content of this report. 
2) Acknowledge the proposed approach to taking forward actions for those
improvement items highlighted in the survey responses.  
The Plan for North Lanarkshire
Priority  Enhance participation, capacity, and empowerment across our
communities
Ambition statement (20) Improve the involvement of communities in the decisions,
and development of services and supports, that affect them
Programme of Work Resilient People
Item 8
Page 71 of 196

Page 72

1.4 Guidance produced by Engage Scotland on behalf of the SHR recommends that these
large scale surveys should be conducted either via a postal, online, or by an interviewer
via a face to face or telephone interview. Our survey meets the SHR technical guidance
on: 
• Method of administering the survey.
• Number of tenants who were surveyed.
• Fieldwork dates of the survey. 
1.5 Due to the covid pandemic our 2021 survey was carried out via the telephone however
we have returned to the face to face interview process for our 2023 survey. 
1.6 In addition to collecting the data on tenant satisfaction required by the SHR, the survey
is a useful mechanism for the services to gather information from tenants on a variety
of issues and areas affecting their home and tenancy. This information is vital in helping
us improve our services to better meet the needs of our tenants. 
2. Report 
2.1 Research Resource was commissioned to carry out to carry out the tenant satisfaction
survey following a procurement exercise. A copy of the report is attached at section 4. 
2.2 It was agreed that the survey questionnaire developed with tenants for the 2018 survey
and used for the 2021 survey would be, as much as possible, re-used so that
comparisons and benchmarking could be made with the results of these surveys. The
survey questions fully met the information needs for the service and included all issues
of importance for tenants. 
2.3 A total of 404 face to face interviews were carried out with our tenants to assess
satisfaction with the services provided by the housing and property teams. Interviews
took place during August and September 2023, with a selection of tenants from each
council locality, occupying all types of housing stock, being selected for interview, to
ensure a broad range of responses in the survey. 
Results of the Survey 
2.4 The results of the 2023 Tenants Survey reveal that the majority of tenants are ‘very’ or
‘fairly’ satisfied with the services provided.  When compared with the previous survey
carried out in 2021, the survey found positive changes in satisfaction levels in the
majority of areas. 
2.5 When comparing the ARC indicators to the 2021 survey results all indicators showed
an improved level of satisfaction. When compared to the Scottish Local Authority
Average, we are performing significantly better across all satisfaction indicators as
noted below. 
2.5.1 ARC Indicator 1 – Percentage of tenants satisfied with the overall service provided by
their landlord. 
2018 2021 2023 Performance Direction LA Average 2023
91% 81.2% 86.6% Increase of 5.4% 83.2% 
Page 72 of 196

Page 73

2.5.2 ARC Indicator 2 – Percentage of tenants who feel their landlord is good at keeping
them informed about their services and decisions. 
2018 2021 2023 Performance Direction LA Average 2023
92.5% 92.6% 95.8% Increase of 3.2% 81.1% 
2.5.3 ARC Indicator 5 – Percentage of tenants satisfied with the opportunities given to them
to participate in their landlord’s decision-making processes. 
2018 2021 2023 Performance Direction LA Average 2023
92.5% 96.8% 96.8% Maintained 76.5% 
2.5.4 ARC Indicator 7 – Percentage of existing tenants satisfied with the quality of their home. 
2018 2021 2023 Performance Direction LA Average 2021
92% 87.13% 87.31% Increase of .18% 81.8% 
2.5.5 ARC Indicator 13 – Percentage of tenants satisfied with the landlord’s contribution to
the management of the neighbourhood they live in.  This was a new indicator for the
2021 survey therefore there is no comparison available for 2018.  
2021 2023 Performance Direction LA Average 2021
88.4% 91.3% Increase of 2.9% 82.5% 
2.5.6 ARC Indicator 25 – Percentage of tenants who feel that the rent for their property
represents good value for money. 
2018 2021 2023 Performance Direction LA Average 2021
85.5% 77.97% 89.3% Increase of 11.3% 81.9% 
2.6 When asked about how satisfied or dissatisfied they were with various aspects of the 
service some of the responses showed a further increase in satisfaction from the 
previous survey in 2021, with positive feedback being recorded across many service 
areas:   
Area of service % satisfied
2021
% satisfied
2023
General satisfaction with the way the Housing Service
deals with repairs and maintenance
80% 87%
Ease of reporting a repair 96% 97%
Attitude of workers 97% 98%
The time taken before work started 83% 87%
The external appearance of your home and
surrounding area
89% 90%
Dealing with antisocial neighbours 76% 80% 
2.7 Other aspects of the service showed a decline in satisfaction. It has been noted through
contractor performance meetings that staff retention and recruitment difficulties
coupled with difficulties and delays in obtaining materials required to provide services
may have an impact on some areas of service delivery, this in turn will have a direct
Page 73 of 196

Page 74

impact on our tenants’ satisfaction and may have impacted the results achieved in the
areas noted below. 
Area of service % satisfied
2021
% satisfied
2023
Information given on when your repair would be
carried out
93% 92%
The time taken to complete the work 96% 83%
Cleaning of indoor and outdoor communal areas for
flats
85% 83% 
2.8 When asking tenants to explain why they are ‘dissatisfied with the housing services
contribution to the management of their neighbourhood’, in response to the returns for
ARC Indicator 13, (Section 2.5.5) most of the reasons cited are not within the remit of
the housing service. Where possible and where the tenant has provided contact details,
we will work with other services, and link with the tenants, to address the issues
highlighted. 
2.9 As well as satisfaction levels, the survey provided vital feedback on tenants’ top
priorities. Within the survey 84% of tenants expressed that the ‘day to day repairs
service’ was within their top 3 priorities in service provision, followed by 56% for
‘planned improvements within homes’ and 48% for ‘managing the common areas
around their homes'.  These were the same top 3 priorities that were highlighted in the
2021 survey. 
2.10 We also used the survey to determine the level of tenants with access to broadband
within their home and what housing services they would access through the internet,
where available. The survey showed an increase in tenants with broadband within their
home with 77% advising they had this available, compared to 66% in 2021. Of the
tenants who do not currently have broadband, 94% advised this was because they
didn’t want it, compared with 88% stating the same reason in 2021. When asked what
housing services the respondents would access via the internet, 60% of respondents
advised they would not use the internet to access any housing services. Of those who
would use these services, 36% said they would use it to ‘report a repair, 19% said they
would ‘pay their rent’ and 14% said they would use it to ‘schedule their annual gas
service’, and the same percentage would use it to ‘claim benefits’. 
2.11 All of the issues raised in the tenant survey will be considered by the relevant Service
Improvement Groups and used to develop improvement actions. These groups will
drive forward and implement service specific improvements based on all the feedback
from tenants in the survey. 
2.12 Improvement actions will involve further tenant consultation at a local level and via
current survey mechanisms with tenants at point of contact. Our tenant participation
team continue to engage regularly with tenants and tenant’s groups through local
meetings and the annual tenant conference which will be held on 4 November 2023. 
3. Measures of success 
3.1  All indicators reported on through the SSHC and ARC are included as a standard
agenda item on each of the Housing Improvement Team meetings and Property
Progress Team meetings that operate across all disciplines within both Housing
Solutions and Housing Property and Projects respectively. These teams continue to
Page 74 of 196

Page 75

review practices, procedures, and customer feedback to ensure that high standards of
service delivery are achieved in all areas.     
4. Supporting documentation 
4.1 Not applicable.   
Stephen Llewellyn
Chief Officer (Housing Management) 
Page 75 of 196

Page 76

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
Production of an ARC and Annual Assurance Statement is a statutory obligation for
all landlords. These both require the landlord to engage with tenants to determine
satisfaction levels. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Page 76 of 196

Page 77

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The council have a legal requirement to provide and Annual Return on the Scottish
Social Housing Charter to the Scottish Housing Regulator on an Annual basis, this
return requires the service to provide information on tenant satisfaction levels in a
number of areas of our service delivery. Failure to carry out this survey would
would impact our ability to fulfil our legal obligation in this respect. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
Page 77 of 196

Page 78

If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 78 of 196

Page 79

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    PH/JS Date 08/11/23 
Transforming Places
New Supply Programme – Update on Progress 
From  Pamela Humphries, Chief Officer (Place)  
E-mail stevensonjam@northlan.gov.uk Telephone
James Stevenson,
Housing Development
Manager,       
07583098631 
1. Background 
1.1 In May 2018, the Committee approved proposals to increase the new supply
programme to deliver 5,000 new homes by 2035. This was strategically linked to the
potential re-provisioning of all tower blocks (4,600 flats) over 20 years. It was estimated
that around 2,300 new homes (50%) would be built on the sites of the tower blocks
Executive Summary 
The purpose of this report is to update Committee on progress of the new supply
programme, which aims to deliver 5,000 new homes by 2035. This report also provides an
update on progress against annual targets previously set, outlines current challenges in
delivering the programme, and seeks approval for revised targets. 
Recommendations
It is recommended that the Committee: 
1) Consider the contents of the report regarding progress of the new supply
programme. 
2) Acknowledge the challenges and opportunities affecting delivery of the new Supply
programme. 
3) Approve the proposed targets for delivery of the programme set out in 2.3. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth
Programme of Work Transforming Places
Item 9
Page 79 of 196

Page 80

following their demolition. The target also included an assumption that the council
would purchase around 550 homes through an expanded empty homes purchase
scheme, which had enabled the council to buy back a number of former council houses.   
1.2 In September 2019, Committee approved proposals to pilot a proposed “Development
Pathfinder” scheme to enable the council to acquire completed housing units from
developers “off the shelf”. The council already acquired “off the shelf” from developers
in the north area where the Affordable Housing Policy applies, however Committee
agreed to extend this approach to the Motherwell, Bellshill, Coatbridge and Airdrie
areas. It was noted that this could potentially act as a catalyst to enable private
development sites to be brought forward and therefore stimulate investment in these
areas and increase new housing provision. In November 2020, Committee approved
proposals to extend the ‘Development Pathfinder’ scheme to cover all of North
Lanarkshire. 
1.3  In November 2022, Committee received an update on the progress with delivery of the
programme and approved targets for the delivery of the programme up to 2035. It was
previously agreed that an annual update would be provided to committee regarding the
delivery of the programme. This report provides an update on progress to date against
previous targets, outlines the challenges faced, mitigation measures in place to address
challenges and sets out the proposed targets for the coming years. 
2. Report 
2.1 Progress to Date 
2.1.1 New Build 
As of 14th September 2023, 1,138 new build homes have been handed over with 451
on site and 334 in total scheduled for completion during 2023/24. To date, 45 new
developments have been completed with a further 10 on site. The programme recently
reached a key milestone with delivery of the 1000th new build council home at
Dykehead Road, Airdrie which demonstrates the transformational effect within the built
environment that the programme provides. 
Key developments at Brandon Street, Motherwell, Castlehill Road, Gowkthrapple,
Northburn Road, Airdrie and Ravenscliff Road, Motherwell are progressing well with
completed properties providing modern, accessible, energy efficient homes that utilise
sustainable technology and achieve enhanced standards of fire safety.   
Several brownfield sites are currently in development phase to ensure the programme
meets its strategic objectives, whilst helping to support town centre regeneration and
place making initiatives. Following recent approval to progress consultation with the
phase 2 re-provisioning programme, site appraisals have commenced with a view to
maximising development potential.     
2.1.2 Open Market Purchase Scheme 
As of 14th September 2023, 689 homes have been purchased through the Empty
Homes and Open Market Purchase Scheme since its inception. The Open Market
Purchase Scheme (OMPS) has been proven as an effective housing delivery
mechanism by providing much needed accommodation in areas of high demand, whilst
representing value for money in the current market with an average purchase and
repair cost of £111,645 in 2023/24. 
Page 80 of 196

Page 81

The number of applications this year has exceeded expectations, which is reflective of
current inflationary rises and changing market conditions. Given the increased
popularity of the scheme, it is therefore projected that at least 100 properties will be
purchased in the current financial year, which exceeds the initial target of 75. Through
our assessment process, officers continue to prioritise properties which are last in a
block resulting in full council ownership; high demand areas and landlord properties
where tenants are at risk of homelessness or contain vulnerable tenants. The volume
of landlord enquiries has also significantly increased in 2023/24. 
2.1.3 Off the Shelf (Affordable Housing Policy) 
As of 14th September 2023, in total 157 homes have been delivered through the
Affordable Housing Policy / Off the Shelf initiative. In 2023/24, 34 properties have been
purchased to date with another 104 under construction. Acquisition via this method
remains good value whilst increasing housing supply in areas of high demand. Current
projections indicate the potential for another 173 properties over 6 sites in the coming
years.   
2.1.4 Development Pathfinder 
Work at the former John Orrs site in Airdrie is nearing completion with the
superstructure now wind and watertight. Properties are expected to be handed over to
the council by the end of the calendar year. Negotiations continue with a range of
developers to identify and develop opportunities that meet the councils housing need
in town centre areas and beyond. 
2.2 Challenges 
2.2.1 Costs 
The cost of new build developments, driven by demand and resource costs, have been
rising for several years, this is reflective of the tender prices recently received from
contractors bidding for new supply projects. Tender cost increases over the past 12
months are on average between 5%-10% higher than the previous year and expected
to extend in to 2024. 
Changes in legislation are also a contributory factor, requiring homes to achieve a high
standard of energy efficiency (fabric first approach), increased use of renewable
technology and enhanced fire safety systems, all of which have a high capital
installation cost. This has been further exacerbated by high inflation this year of circa
6%. 
Cost projections to deliver key town centre regeneration projects are also significantly
higher than initial estimates produced at feasibility stage. This is due to factors noted
above and the additional complexity of complying with Historic Environmental
Scotland’s (HES) requirements, which in many cases insist on façade retention and re-
use of existing building features/structures. 
The increased costs associated with the delivery of the new supply programme will
continue to be monitored and factored into the HRA 30-year projections which
incorporates grant funding allocations. Acquisitions via the Open Market Purchase
Scheme and Off the Shelf purchases continue to provide good value, augmenting the
traditional new build option. 
Page 81 of 196

Page 82

2.2.2 Scottish Water - Surface Water Policy 
As previously reported to Committee, Scottish Water’s Surface Water Policy of not
accepting any new connections to the combined sewer network, has impacted our
ability to develop several sites. Alternative drainage solutions have been explored;
however, many are untested within a social housing environment or are financially
unviable. Regular liaison with Scottish Water representatives continues. 
2.2.3 Ground Condition of Sites 
The vast majority of council owned sites are brownfield, which are typically problematic
to develop due to a variety of factors such as contamination, mine workings and made
ground. The cost to remediate unfavourable ground conditions can make smaller
developments, in areas of high demand, financially unviable due to inability to achieve
economies of scale that larger developments can accommodate. 
The council’s wider Ambition programme, including asset rationalisation and
town/community hub programmes will result in new sites becoming available that may
be more appropriate for housing development. Additionally, sites declared as surplus
by the council are also assessed for their viability. 
2.3 Programme Targets 
Due to the nature of the new supply programme and the fluctuating market in which it
operates, long-term projections can often vary. Estimated targets for this and the next
three years are set out in the table below, including the balance to be delivered by 2035.    
Table 1 New Supply Projections as at November 2023 
2.4 The delivery of the targets for 2022/23 fell below original projections, due to a variety
of factors affecting the construction market, including the challenges noted above but
also contractor performance, sub-contractor availability due to fluctuating rates of pay,
material availability and OMPS market conditions during the period. It should be noted
that several completions have now been delivered within 2023/24. 
2.5 Projections for 2023/24 through to 2035 have been adjusted to reflect previous slippage
and sites under design development. The delivery of the new supply programme will
be closely monitored with regular updates provided to Committee, including annual
updates on progress against targets and any further adjustments that may be required.   
Year New
Build
Council
New
Build
Off the
shelf
OMPS (incl.
targeted
extension) 
Total Approved
Targets
November 
2022
2022/23 (actual) 76 6 70 152 220
2023/24 256 78 100 434 351
2024/25 186 82 100 368 448
2025/26 300 33 100 433 433
2026/27 233 39 100 372 333
2027 - 2035 827 315 605 1747 1721
Total 1878 553 1075 3506 3506
Completions to March 2022 817 117 560 1494  
Grand total 2695 670 1635 5000
Page 82 of 196

Page 83

3. Measures of success 
3.1  The measure of success will be the effective delivery of the council’s new supply
programme which aims to deliver 5,000 homes by 2035.   
3.2 The new supply programme will also contribute to the regeneration of town centres
within North Lanarkshire which remains a key priority within the Transforming Places
Programme of Work.   
4. Supporting documentation 
Appendix 1 – New Build Sites as at 19 September 2023 
Pamela Humphries
Chief Officer (Place) 
Page 83 of 196

Page 84

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The new supply programme helps support delivery of the seven strategic outcomes
of the local housing strategy whilst meeting the statutory requirements and
contributing to national priorities and targets. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The new supply programme is funded through a combination of prudential
borrowing, capital funding, Scottish Government grant funding and subsidy income.
The affordability of both the new supply and OMPS are reviewed each year and
incorporated into the 30-year Business Plan. Grant funding has increased from
£71,500 to £83,584 per unit, based on a 3-person equivalent as well as additional
grant funding available for additional quality measures and renewables. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☒
Page 84 of 196

Page 85

If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The new supply programme has been considered through the Strategic
Environmental Assessment (SEA) as required by the Environmental Assessment
(Scotland) Act 2005and there are no major issues of relevance identified. 
All new homes are built to the current technical standards or higher. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The new supply programme is promoted via the strategic PR plan with Corporate
Communications with Local Members and other key stakeholders. 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The councils Risk Management Strategy 2023- 2026 is adopted at both a service
and project level basis for delivery of the new supply programme. This incorporates
risk management governance, structure and methodology which are reviewed at
regular intervals. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)?
Page 85 of 196

Page 86

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 86 of 196

Page 87

Appendix 1   New Build Sites as at 19 September 2023 
Area Location Units Comments
Completed Holytown Main St 10 Completed (Amenity)
Holytown Spruce Way 10 Completed
Motherwell Ravenscraig (David Wilson
Homes)
18 Completed (off the
shelf)
Airdrie Clarkston PS 19 Completed
Millerston Coshneuk Rd 11 Completed (Amenity)
Cumbernauld North Rd 29 Completed
Wishaw Cambusnethan PS 20 Completed (Amenity)
Viewpark Laburnum Rd (Phase 1) 12 Completed
Viewpark Laburnum Rd (Phase 2) 28 Completed
Moodiesburn Gartferry Road 50 Completed
Cumbernauld Westfield Drive 30 Completed 
Airdrie Former Albert PS 14 Completed
Chryston Lanrig Rd 27 Completed (Amenity)
Coatbridge Corsewall St 14 Completed
Bellshill Former Belvidere PS 20 Completed
Kilsyth Fisher Ave 30 Completed
Chryston Old Lindsaybeg Rd
(Persimmon)
14 Completed (off the
shelf)
Motherwell Glencairn Tower site 25 Completed
Viewpark Former Tannochside PS 16 Completed
Wishaw Walkerburn Dr, Coltness 20 Completed
Cumbernauld Cardowan Drive 30 Completed
Cumbernauld Kildrum Nursery 16 Completed
Chryston Station Rd (Persimmon) 30 Completed (off the
shelf)
Chapelhall Former St Aloysius PS
(Phase 1)
24 Completed
Chapelhall Former St Aloysius PS
(Phase 2)
6 Completed
Cumbernauld Brown Road 20 Completed
New Stevenston Former New Stevenston
PS
15 Completed
Chryston Greenlea Road 21 Completed
Coatbridge Old School Court 20 Completed
Airdrie Former Alexandra PS 14 Completed
Harthill Former Harthill PS 20 Completed
Motherwell Cleekhimmin, Ravenscraig
(Barratt)
10 Completed (off the
shelf)
Coatbridge Blair Road 40 Completed
Motherwell Calder PS 30 Completed
Gartcosh Johnston Rd / Inchnock
Ave (Bellway)
16 Completed (off the
shelf)
Cumbernauld Cedar Road Nursery 14 Completed
Chryston Main Street (Bellway) 18 Completed (off the
shelf)
Page 87 of 196

Page 88

Wishaw Meadowhead Rd,
Ravenscraig (Keepmoat)
11 Completed (off the
shelf)
Bellshill Caledonian Avenue
(Phase 1 )
19 Completed
Wishaw Dimsdale Road (Phase 1) 6 Completed
Bellshill  Caledonian Avenue
(Phase 2) 
8 Completed
Wishaw  Dimsdale Road  (Further
Phases)
55 Completed
Coatbridge  St James PS / Lismore
Drive
58 Completed
Wishaw Roberts Street (Belhaven
House)
16 Completed
Wishaw Mossburn St, Waterloo 20 Completed
Plains Plains PS 16 Completed
Bellshill Community Road 29 Completed
Airdrie  Dykehead Road, Holehills
(Phase 1)
11 Completed 
Motherwell Torrance Park (Phase 1)
(Barratt) 
6 Completed (off the
shelf)
Chryston  Chilterns Care Home,
Lindsaybeg Road 
21 Completed
Airdrie  Dykehead Road, Holehills
(Further Phases)
67 Completed
Stepps Gateside Farm (Barratt)  30 Completed (off the
shelf)
Motherwell Torrance Park (Phase 2)
(Barratt) 
4 Completed (off the
shelf)
Sub total   1138 Completed
On Site  Airdrie Dykehead Road, Holehills
(Remaining Phases)
72 On Site
Airdrie Northburn Place 31 On Site
Airdrie  Former Orrs Building
(Wilson)
20 On Site (off the shelf)
Wishaw Castlehill Road,
Gowkthrapple (Phase 1) 
97 On Site
Coatbridge Berwick St 19 On Site
Motherwell Former BRE, Ravenscliff
Rd, Ravenscraig
24 On site
Airdrie Glenacre Drive 16 On Site
Airdrie  Former Petersburn PS  40 On Site
Motherwell Brandon Street 48 On Site
Moodiesburn Auchengeich, Gartferry
Road (Bellway)
12 On Site (off the shelf)
Coatbridge  Lorne Place (Allanwater)  24 On Site (off the shelf)
Cumbernauld Dowanfield Road (Zoom) 24 On Site (off the shelf)
Gartcosh  Johnston Rd - Phase 2
(Bellway)
12 On Site (off the shelf)
Shotts Springhill Road -
(Keepmoat) 
12 On Site (off the shelf)
Sub total   451 On site
Page 88 of 196

Page 89

Design
Development
Coatbridge Columba High School 127 Planning app
submitted
Motherwell Mabel Street 20 Planning app approved 
Glenmavis McArthur Ave 21 Planning app approved
Viewpark Laburnum Rd 26 Planning app approved
Coatbridge Bank Street 6 Planning app approved
Chapelhall Gibb Street 25 Planning app approved
Wishaw Graham Street 13 Planning app
submitted
Coatbridge Kildonan Street 49 Design development
underway
Cumbernauld Former Cumbernauld
Village PS
8 Planning app approved
Glenboig Former Police Station,
Main Street
7 Planning app approved
Wishaw King Street 5 Planning app approved
Wishaw Stewarton Street & Kings
House
18 Planning app
submitted
Motherwell Former Motherwell Town
Hall
20 Planning app approved
Airdrie Calderigg Place  42 Design development
underway
Millerston Coshneuk Road 16 Design development
underway
Wishaw  Caledonian Road  15 Planning app
submitted 
Coatbridge  Mitchell Street 100 Design development
underway
Caldercruix  Former St Mary's PS  25 Design development
underway
Bellshill Thorn Road  26 Design development
underway
Airdrie  Airdriehill Street  65 Design development
underway
Motherwell  Hope Street (Masonic Hall) 10 Design development
underway
Coatbridge  Main Street  40 Design development
underway
Motherwell  Dalzell Drive 24 Approved at
Committee - Feb 2023
Newmains  Former St Brigid's PS  35 Approved at
Committee - Aug 2023
Coatbridge ` Former Pentland School
(Tay Street)
16 Approved at
Committee - Aug 2023
Coatbridge Former Portland HS
(Kildonan Street)
16 Approved at
Committee - Aug 2023
Sub total   775 Design development
underway
Re-
provisioning
Coatbridge Shawhead 111 Re-provisioning site
Coatbridge Dunbeth  170 Re-provisioning site
Page 89 of 196

Page 90

Motherwell Coursington 60 Re-provisioning site
Sub total   341 Re-provisioning sites
Off The Shelf Cumbernauld Community Growth Area -
Phases 1-3 (Bellway)
75 Off the shelf
Planning app
submitted
Chryston Gartferry Road
(Allanwater)
22 Off the shelf                       
Purchase approved at
Committee
Coatbridge 
Former DWP Offices,
South Circular Road (ML5
Limited)
39 Off the shelf
Purchase approved at
Committee
Motherwell  Prospecthill Road (O'Brien
Properties Limited)
23 Off the shelf
Purchase approved at
Committee
Motherwell  Torrance Park - Phase 3
(Barratt Homes)
4 Off the shelf
Purchase approved at
Committee
Shotts Springhill Road -
(Keepmoat) 
10 Off the shelf
Purchase approved at
Committee
Sub total   173 Future off the shelf
purchases from
developers
Total    2878   
Page 90 of 196

Page 91

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    PH/JS/NS Date 08/11/23 
New Supply Programme – Community Benefits Update 
From  Pamela Humphries, Chief Officer (Place)  
E-mail stevensonjam@northlan.gov.uk Telephone James Stevenson, Tel
07583098631 
1. Background 
1.1 Community benefits are tangible, positive outcomes linked to public sector contracts,
which help to improve the lives of local people in North Lanarkshire and help local
communities to thrive.  Community benefits help to boost employment and skills
opportunities for local people and support local community initiatives, in addition to the
general economic benefit the investment brings to each area such as increased
opportunities for local businesses.   
Executive Summary
The purpose of this report is to update the Committee regarding Community Benefits
related to the new build housing programme since the last report in November 2022 for the
period from 1st Sept 2022 – 1st Sept 2023. The report also reflects on the community
benefits in the last 3 years from 2020 to 2023. 
Recommendations
It is recommended that the Housing Committee 
1) Consider the contents of the report regarding the current position on the delivery of
community benefits. 
2) Acknowledge that an update on community benefits from the New Supply
Programme will continue to be submitted annually.  
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth
Programme of Work Transforming Places 
Item 10
Page 91 of 196

Page 92

1.2 The Council is committed to maximising the delivery of community benefits. The
procurements undertaken for any New Supply project includes a community benefit
requirement which is assessed as part of the quality evaluation.   
1.3 The Council predominantly use procurement Frameworks to deliver its new build
programme where a points-based approach is used and the supplier must deliver a
stated number of community benefits points depending on the contract value.  A list of
community benefit outcomes and associated points are provided which are specifically
focused on recruitment and employment, however purchasers may agree on
alternatives with the supplier depending on the needs of the local area. 
1.4 As part of the Council’s Plan for North Lanarkshire to support young people towards
more positive outcomes, collaboration between New Supply; Education and Families; 
Supported Enterprise and Employability teams helps facilitate work experience and
opportunities to positive destinations within construction. There is a particular emphasis
on supporting key priority groups, as part of the delivery of the Plan for North
Lanarkshire and the Brighter Futures Programme of Work to help improve employment
opportunities and tackle inequality. 
2. Report 
2.1 Current Position 
2.1.1 Community benefits for each new build development are pledged by contractors during
the tender process and are monitored through the contract.  The New Supply Team
work closely with the contractors and provide relevant support and assistance to help
maximise the benefits for local people and meet the council’s requirements. 
2.1.2 A Community Benefits Development group has been established which meet every two
months with the various stakeholders such as Education, Early Careers, Virtual
Schools, Developing the Young Workforce, Supported Enterprise, the Apprenticeship
team, and Employability services. The Group helps to co-ordinate and maximise
opportunities created through the new supply programme, establishing clear lines of
communication, and developing plans to deliver and achieve the targets set out in each
tender and to deliver the council’s objectives.  This group has also assisted other parts
of the service to manage their community benefits in a more consistent and
collaborative approach. 
2.2     Community Benefits Menu 
2.2.1 Each of the elements below describe the Community Benefits included in the
council’s tender process.   
2.2.2 Employment - Targeted Recruitment and Employment 
The new supply team collaborate at the early stages of each project with ALEO “Routes
to Work” to maximise the partnership with the contractors to match the right job for the
right person within North Lanarkshire and to tackle any training requirements to support
people into employment.  Understanding the contractors’ proposed community benefits
activities and outcomes from future projects, helps with forward planning, and the ability
to collaborate with internal and external stakeholders prior to the commencement of
the project to achieve maximum benefit.  All relevant stakeholders meet at the
Community Benefits Working Group chaired by New Supply to collaborate and discuss
future plans and requirements.
Page 92 of 196

Page 93

As outlined in Appendix 1, since 2020, there have been 30 local people employed
through Community Benefits from key priority groups such as people who have been
unemployed for more than 6 months and/or have no relevant experience and/or women
returning to the labour market.   A further 11 employment opportunities for people from
priority groups are projected. The posts provided must be a minimum of 30 hours per
week and last a minimum of 26 weeks.  In addition, 26 new start apprentices have been
employed. The apprenticeship must be filled either by a person aged 16 years of age
or older.  There have also been 33 workplace placements which lasts a minimum of 2
weeks for an unemployed person 16 years or over and include vocational tasters, to
enable the person to gain a meaningful insight into the construction sector and/or
business operations evident with the supply chain. Collaboration at the early stages of
each development has proven to help secure a meaningful work placement or
permanent position. 
Good examples of success and collaborative working include the Department of Work
and Pensions “Kickstart Scheme” which provides an opportunity to offer young people
facing multiple barriers to employment to not only gain valuable experience of the
industry but also potentially access long term employment and careers.  Kickstart
Scheme, provides full time employment for 6 months as well as a supported training
programme.  The council’s new build sites in conjunction with “Kickstart Scheme”
continue to develop new talent and promote young people into full time employment. 
2.2.3 Education 
• Scottish Apprenticeship Week 2023 
Collaboration with Education and Families is delivering prescriptive education events
the schools and young people need through careers events and work experience. 
During the pandemic North Lanarkshire Council asked the contractors to come up with
learning material that could be delivered virtually. 
In early 2022, with restrictions not fully eased to allow face to face sessions, the New
Supply team worked together with Developing the Young Workforce, Skills
Development Scotland, and contractors to plan and deliver construction related
education sessions as part of the council’s Scottish Apprenticeship Week (SAW)
“Introducing the Apprenticeship Family” and “Careers in Construction” event. 
We continue to mark International Women’s Day with several sessions set up
throughout the week highlighting Women in Construction. The sessions were delivered
by employees and apprentices from contractors working in North Lanarkshire as part
of their community benefits. 
The SAW event was such a success that we have carried on delivering these sessions
in a hybrid approach, we also delivered a construction only event “Step into
Construction & the Built Environment” virtual event which ran during the week of the
7th of February 2023. The “Step into Construction and the Built Environment” virtual
event was open to primary and secondary schools across North Lanarkshire, South
Lanarkshire, and East Dunbartonshire with the aim of highlighting the range of career
opportunities in construction and the built environment, the pathway from school into
the sector through the college route and how the skills developed in school and college
link to the world of work.
Page 93 of 196

Page 94

Nineteen 30-minute sessions were hosted by New Supply Community Benefits Project
Development Officer and Developing the Young Workforce representative. Each
session was made up of two parts. The first session was delivered by lecturers and
students from New College Lanarkshire and South Lanarkshire College showcasing
the fantastic range of courses available in construction and how subject choices, skills
and interests related to these courses and the progression routes from each course
into the world of work.  The second part was delivered by people working in the
construction industry to highlight the pathway from college into a career in construction
and look at how the college courses described prepare young people for a career in
the industry. Each 30-minute session consisted of a live presentation followed by a
Q&A with schools asking questions via the chat bar.   The recordings are on our NL
Virtual Classroom creating a library of information that is available to all schools to
access at any time and will be added to year on year.
The event was another huge success, with 19 interactive sessions being delivered to
21 schools. 1,503 young people accessed the sessions.  An average of 79 pupils per
session, approximately 301 young people per day.  
Examples of how these sessions could be used in future might include incorporating
them into school career events, to help young people understand what apprenticeships
are and the benefits of them, to raise awareness of the range of jobs in construction
and to reduce barriers to help make parents aware of the opportunities that are
available to the young people.
It is intended to continue to run virtual sessions in conjunction with face-to-face
sessions as a hybrid approach to gauge how successful they are with a view to reach
more young people including primary school age. 
Construction Skills Certification Scheme (CSCS) Training for Additional
Supported Needs (ASN) Sector
Another initiative supported by one of our new supply contractors involved delivery of
bespoke training sessions to help reduce barriers for our young people with additional
support needs, in preparation to enter the world of work. During 2022, 5 pupils from
Buchanan High school participated in both SQA Health and Safety in a Construction
Environment training and CSCS training. Each of these pupils has an additional support
need from Global Learning Delay to Autism and at least 2 pupils have severe difficulty
reading and writing. The pupils required the course to be well structured, clear, practical
where possible, and support to be given in reading and writing.  The appointed
contractor has been instrumental in providing workshops to suit the needs of the young
people.  With the use of videos, activities and discussion the contractor created a solid
foundation of understanding in Health and Safety in Construction. 
In 2022, 5 pupils passed their SQA exam, as has their support teacher.  All were
scheduled to take their CSCS Exam in autumn 2022 however the young people needed
a little more time to get exam ready.   Four of the 5 pupils (and their support teacher)
passed their CSCS exam in early 2023. Following on from this, the 4 pupils who passed
both exams have all secured apprenticeships with McTaggart Construction through the
“No Limits” Apprenticeship Scheme.  The 5th pupil who undertook the CSCS card has
since been accepted for a mainstream college course in Digital Media.  He would like
to be involved in construction in the future (in cyber security area) so this is the perfect
pathway for him.
Page 94 of 196

Page 95

As part of the plan for North Lanarkshire, helping to break down these barriers to
achieve these accreditations will help our disadvantaged young people into a
construction related career. 
McTaggart Construction will take another cohort of pupils this school session - a larger
group from Buchanan High School and a pupil from Caldervale High School. 
We have received some recent feedback from Buchanan High School staff as follows:
“All of our young people have additional support needs and so many barriers to gaining
a positive destination - the input from Community benefits and McTaggart’s has been
the differing factor in ensuring they have a positive and sustainable future”. 
2.2.4 Enterprise – Supply Chain Development 
As part of Supply chain development, the Council encourage appointed contractors to
get involved in “Meet the Real Buyer” events.  These events are useful in terms of
engaging with small businesses within the area to help them develop and grow their
business.   
A previous example of this is that as part of their Community Benefits, a new supply
contractor delivered a Meet the Buyer session to approximately 30 construction
businesses in partnership with Business Gateway Lanarkshire.  This session covered
how to join their supply chain and the process for securing work from them.  They
discussed future projects and upcoming activities that the local supply chain could be
part of.   
A further 6 Meet the Buyer sessions, and 3 Business Mentoring sessions for SME’s.
are forecast. 
2.2.5 Community Engagement - Financial support 
There has been engagement with the Communities Team to develop new approaches
to implement community benefits including Participatory Budgeting (PB). This allows
officers who understand local communities at grass roots level to create a process for
giving community groups an input to how and where funds should be spent in a fair,
transparent and democratic process. It is intended that PB will be the preferred method
to implement community benefits financial support and will be part of a future
Community Benefits Wish List process being developed. 
Some examples of financial benefits provided to communities are outlined below: 
• £1,000 from our Petersburn site to purchase a 360degree camera to record
virtual construction site training videos for use at the immersive classroom.
• £1,080 donation pledged from our Brandon Street Project to Forgewood
Allotments group to rebuild some raised beds for disabled plot holders. Also
£3,000 earmarked for assistance at Muirhouse Primary School working with
deprived young people.
• £2,000 from our Berwick Street development for materials bought and sent to
Restorative Justice team to build mud kitchens and planters for The
Shawhead Family Centre nursery for their outdoor play equipment. 
Page 95 of 196

Page 96

The remainder of the budget outlined in Appendix 1 has still to be apportioned through
the Participatory Budgeting process and community projects outlined in the tender
documents.
2.2.6 Non – Financial Support 
The New Supply team receive requests or ‘wishes’ from local community groups.  From
2020 to date, New Supply Community Benefits has enabled over £27,000 worth of non-
financial support to schools, community groups within North Lanarkshire. This includes
several non-financial support activities carried out during 2023 with an approximate
value of £5,510. These activities are where the New Supply Team co-ordinate and
collaborate with other internal and external agencies to achieve goals / activities and
outcomes.  Contractors who are part of the New Supply programme have donated
various items such as training time, and excess construction related materials that may
otherwise have been re-cycled or sent to landfill.  There are multiple benefits with this
process including environmental and financial savings.     
3. Measures of success 
3.1 Contract performance and community benefits are proactively managed against a
number of Key Performance Indicators that are managed by the New Supply Team. 
Appendix 1 shows an extract from the New Supply Community Benefits Tracker
showing measures of success from 2020 -2023 and the forecast for the coming months.
4. Supporting documentation 
Appendix 1 – Extract from Community Benefits Tracker 2020 – 2023   
Pamela Humphries
Chief Officer (Place) 
Page 96 of 196

Page 97

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 97 of 196

Page 98

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
New supply programme complies with the published data relating to the Equalities
Impact Assessment and have created housing for Scottish Veterans. 
New Supply Programme (Equality Impact Assessment) | North Lanarkshire Council 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 98 of 196

Page 99

Appendix 1 - Measures of Success   
Extract from New Supply Community Benefits Tracker   
The table below shows the completed Community Benefits 2020 – 2023 
* 1 year constitutes no of completions from 1st Sept – 1st Sept of the following year. 
Targeted Recruitment and Employment  2020 2021 2022 2023 Completed
2020-2023
Forecast
2023/2024
TRE01  New Entrants – Key priority Groups    4  10  4  12 30 6
TRE02  New Entrants – no relevant experience       2  6 3 11 5
TRE03  New Entrant - Graduate            1 1 0
TRE04  New Start - Apprentice        7 15 4 26 1      
  
       
Targeted Skills & Training   2020 2021 2022 2023 Completed
2020-2023
Forecast
2023/2024
TST01  Work Experience Placement  
(16 + years of age)   0 10 9 23 42 40
TST02  Work Experience Placement  
(14 - 16 +years of age)       0  1 0 1 3
TST03  Work Experience Placement - Graduate            1 1 0
TST04  Careers Event     1 1 25 26 53 11
TST05  Site Visit          9  8 17 8
TST06  School Mentoring or Enterprise
Programme    1  0  6 2 9 3      
  
       
Supply Chain Development   2020 2021 2022 2023 Completed
2020-2023
Forecast
2023/2024
SCD01  Supply Chain Briefing with SME’s     1 3 1 5 6
SCD02  Business Mentoring for a SME’s               3      
  
       
Community Engagement        2020 2021 2022 2023 Completed
2020-2023
Forecast
2023/2024
CCE01  Financial Support for a Community
Project   3 3 7 3 16 16
CCE02  Non-Financial Support for a Community
Project       7 7 4 18 7
Page 99 of 196

Page 100

Completed = Total of completed community benefits from 14 developments from 2020 to date. Note total
number of completions are higher than post contract award. Some pledges still to be achieved are included in
the forecast figure.
Forecast = Total includes the community benefits still to be delivered from 9 developments in progress or just
started.   
A further 29 projects, total of 1116 units still to commence post September 2023 – 2027 which will become part
of the forecasted figures as they complete the tender process. These figures will continually change as
developments complete and new developments begin.   
Figures as per the New Build Summary update as at Sept 23.  This does not include AHP and OTS. 
Page 100 of 196

Page 101

North Lanarkshire Council
Report
Housing Committee
Does this report require to be approved? ☒ Yes   ☐ No
Ref  PH/JS Date 08/11/23
New Supply Programme – Procurement Update  
From Pamela Humphries, Chief Officer (Place)
E-mail stevensonjam@northlan.gov.uk Telephone
James Stevenson,
Housing Development
Manager, 07583098631
Executive Summary
The purpose of this report is to update the Committee on current procurement activity
relating to the new build housing programme and seek approval to progress procurement
arrangements as outlined in the report.
Recommendations
It is recommended that the Housing Committee approves the procurement of a:
1) “Direct Award” call off procedure in line with the Scotland Excel (SXL) New Build
Residential framework agreement to award a contract for the construction of new
build housing at Shawhead, Coatbridge to CCG Construction Limited up to the
revised value of £23.74M, including contingency allowance. If the procurement
cannot be completed via the SXL framework within the validity period, then the
contract will be procured via the Scottish Procurement Alliance (SPA) New Build
Housing Construction H2 (Scotland) framework agreement.
2) “Mini Competition” call off procedure in line with the SPA New Build Housing
Construction H2 (Scotland) framework agreement to award a contract for the
construction of new build housing at the Columba High School site, Coatbridge, up
to the value of £31.00M, including contingency allowance.
3) “Direct Award” call off procedure in line with the SPA New Build Housing
Construction H2 (Scotland) framework agreement to award a contract for the
construction of new build housing at Main Street, Glenboig to Connect Modular
Limited up to the value of £1.645M, including contingency allowance.
4) “Direct Award” call off procedure in line with the SPA New Build Housing
Construction H2 (Scotland) framework agreement to award a contract for the
construction of new build housing at Glasgow Road, Cumbernauld to Connect
Modular Limited up to the value of £1.88M, including contingency allowance.
Item 11
Page 101 of 196

Page 102

1. Background
1.1 The council has an approved programme to deliver 5,000 new homes by 2035. The
delivery of such a large scale programme presents a number of challenges, not least
of which is the procurement of contractors to build the houses to the required standard,
within the timescale required and at a competitive cost. In order to increase the pace
of delivery, secure best value and minimise risk to the Council, a range of procurement
options have been utilised. 
1.2 The Housing and Regeneration Committee on the 25 November 2020 approved the
procurement route for the next phase of the new build programme to commence
procurement activity with the Scottish Procurement Alliance (SPA) and Scotland Excel
(SXL) new build housing framework agreements to deliver the next phase of new build
sites approved by the Committee. As reported at the Housing and Regeneration
Committee on the 8 September 2021, due to the current capacity issues in the market
we intend to utilise the ability in the SPA and SXL frameworks to direct award to
available contractors, including to contractors who are not highest ranking. Justification
for the identification of a contractor can be made by complying with the direct award
criteria listed in the respective frameworks, with a contract award being subject to value
for money assessment against the framework rates. A benchmarking appraisal was
carried out for each project and is identified in each project’s “Contract Strategy”. 
2. Report
• Shawhead, Coatbridge, (re-provisioning site) (101 units), at the revised value
of £23.74M, including contingency allowance.
The feasibility costs obtained are considered to represent best value and, subject to
benchmarking against the appropriate framework rates, it is proposed that a final tender
price be agreed to allow the contract award.
5) “Mini Competition” call off procedure in line with the SXL Building Construction
Consultancy framework agreement to award a contract to appoint a consultant
design team for new build housing at Dalziel Drive, Motherwell up to the value of
£140,000.00, including contingency allowance.
The Plan for North Lanarkshire
Priority Improve the health and wellbeing of our communities
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth
Programme of Work Transforming Places
2.1 The council has engaged with CCG (Scotland) Limited, who are a contractor on the
SXL New Build Residential framework agreement for North Lanarkshire, and feasibility
costs have been obtained for the project detailed below. The intention is to procure via
the SXL framework agreement but if the procurement cannot be completed within the
validity period, it is proposed that the project will be procured via the SPA New Build
Housing Construction H2 (Scotland) framework agreement. 
Page 102 of 196

Page 103

2.2  It is proposed to use a mini competition call off procedure to procure the following new
build housing project via the SPA New Build Housing Construction H2 (Scotland)
framework agreement:
• Columba High School site, Coatbridge, (127 units) at the value of £31.00M,
including contingency allowance.
The feasibility costs provided are considered to represent best value and the most
economically advantageous tender will be checked and recommended to allow the
contract award.
• Main Street, Glenboig (7 units), at the revised value of £1.645M, including
contingency allowance.
• Glasgow Road, Cumbernauld (8 units), at the revised value of £1.88M, including
contingency allowance.
The feasibility costs obtained are considered to represent best value and, subject to
benchmarking against the appropriate framework rates, it is proposed that a final tender
price be agreed to allow the contract award.
2.4 It is proposed to procure via a mini competition call off procedure a consultancy design
team via the SXL Building Construction Consultancy framework agreement as detailed
below:  
• Dalziel Drive, Motherwell (21 units) at the value of £140,000.00, including
contingency allowance.
The feasibility costs provided are considered to represent best value and, subject to
tender checking the most economically advantageous tender will be recommended to
allow the contract award.
Next Steps
2.5 The next batch of sites will be reviewed, and a suitable procurement route will be
identified to progress these projects to deliver new build housing to align with the Plan
for North Lanarkshire.
Price Savings / Increases
2.6 There are no cashable savings attributed to the contracts outlined within this report.
Price Stability
2.7 The pricing mechanism is a Priced Contract with Activity Schedule offering a good level
of cost certainty.
Community Benefits
2.8 The council is committed to maximising the delivery of community benefits. The
procurement includes a community benefit requirement, this approach is designed to
deliver local community benefits where possible.
Fair Work Practices
2.3 The council has engaged with Connect Modular Limited who are a contractor on the
SPA New Build Housing Construction H2 (Scotland) framework agreement. Feasibility
costs have been obtained for the projects detailed below:
Page 103 of 196

Page 104

2.9 All contractors appointed to the SPA and SXL framework agreements have evidenced
fair working practices within their organisations as part of the procurement procedures
to be appointed to the respective frameworks and have further demonstrated how they
will promote them in the delivery of Council call-off contracts.
Contract Strategy
2.10 Officers from New Supply will be responsible for managing contracts which will be
undertaken in accordance with the council’s agreed approach to contract and supplier
management.
3. Measures of success
3.1  The proposed contract awards detailed within this report will deliver the following
outcomes:
a) The appointment of contractors who have the experience and capability to deliver new
build social housing;
b) The procurement procedure applied are compliant with the procurement legislation,
overarching framework agreements and internal procedures;
c) That best value is both demonstrable and achieved;
d) That contracts awarded secure a range of community benefits;
e) That contracts awarded support payment of the real Living Wage to staff employed in
the delivery of the requirements; and
f) That the performance of contracts awarded are proactively managed against a number
of Key Performance Indicators.
4. Supporting documentation
4.1 Not applicable.
Pamela Humphries
Chief Officer (Place)
Page 104 of 196

Page 105

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Council’s new build programme helps reduce inequalities through a number of
design specifications including: 
• Housing for Varying Needs;
• Secure by Design;
• Achieving the Scottish Government requirements for “Greener Homes”
to reduce the incidence of fuel Poverty; and
• The inclusion of design standards relating to access to internet
capabilities including ‘fibre to the property’. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The funding for all of the projects referred to in this report can be met from the
Council’s Housing Revenue Account budget for the New Supply Programme. Grant
support is also provided by the Scottish Government. The costs associated with
contract delivery will be contained within the New Supply budget.   
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Page 105 of 196

Page 106

5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The proposed award of contracts detailed within this report will ensure that the impact
on the Council’s carbon footprint is mitigated. The specifications incorporated within
the contract documentation will: deliver reduced energy need; encourage
sustainable construction; promote health and wellbeing; reduce waste and resources
through effective storage, collection and composting of waste and recyclable
materials and; include measures which will reduce CO2 emissions. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The implementation and delivery of the New Supply programme will be promoted
through the New Supply PR plan and via communications with elected members and
local stakeholders 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Risk associated with the New Supply Programme is managed within the New Supply
Risk Register process. The risk register has been updated to reflect the impact of
Page 106 of 196

Page 107

the current national issues affecting the costs and availability of materials and labour
along with general high inflation on programme timescales and costs as well as how
the risk to the council will be mitigated as far as possible. The tender cost increases
over the past 12 months are on average 5% to 10% and this trend of tender price
increases will extend into 2024 excluding the additional changes to legislation and
meeting Scottish Government energy targets. Comparing similar sized projects the
tender costs over past 18 months are on average 10% higher. The council will also
undertake detailed ground investigation and other relevant site assessments prior to
proceeding with the development of any particular site to help mitigate the risk of
unforeseen costs relating to ground conditions, although this risk cannot be
eliminated entirely. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 107 of 196

Page 108

Page 108 of 196

Page 109

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    SL / GT Date 08/11/23 
Housing Revenue Account – 2024/25 Revenue Estimates 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail kempe@northlan.gov.uk Telephone 01698 302408 
1. Background 
1.1 Income and expenditure in relation to a local authority’s own direct provision of housing
must be recorded within a Housing Revenue Account (HRA) as set out in the Housing
(Scotland) Act 1987. In addition, this Act sets out the requirement for local authorities
to set an annual budget to support sound financial management and helps ensure that
expenditure is linked to the key priorities of tenants. 
1.2 North Lanarkshire is Scotland’s largest local authority landlord, with a housing stock of
approximately 36,000. The number has reduced marginally over the last year reflecting
the impact of tower re-provisioning, partially offset by additions to the stock through the
Council’s new supply programme and buy back schemes. 
Executive Summary
The purpose of this report is to present to Committee information that will enable the
Council to set its Housing Revenue Account (HRA) budget and rent levels for 2024/25. 
Recommendations
It is recommended that Committee: 
(1) Recognises the HRA cost pressures detailed in Appendix 1,
(2) Recognises the base budget savings outlined in Appendix 2,
(3) Considers the HRA reserve balances as detailed in paragraphs 2.5 to 2.8, and
(4) Agrees to review the financial assumptions contained in this report at the Council
meeting in December 2023 to approve the HRA Revenue Estimates and rent levels
for 2024/25.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 12
Page 109 of 196

Page 110

1.3 The Council approved its 2023/24 HRA budget of £164m on 23 February 2023 with
£152m (93%) funded by rental income from tenants, £9m (5%) from other fees and
charges and £3m from reserves (2%). 
1.4 The average 2023/24 weekly rent in North Lanarkshire of £80.33 is the eleventh lowest
amongst Scottish local authority landlords and 2% below the Scottish local authority
average. The recent Landlord Report published by the Scottish Housing Regulator
shows North Lanarkshire Council’s rents are between 14.1% (for a 1 apartment) and
17.8% (for a 2 apartment) below the Scottish average for all social housing rents. 
1.5 In setting the HRA budget and rent levels in December 2017, the Council agreed to an
average rental increase of 5% for 2018/19 and 5% for the subsequent three years up
to 2021/22. For 2022/23 the rent increase was set at 3%, with a 5% increase approved
for 2023/24. 
1.6  Committee has received regular updates on the progress of delivering the Council’s
ambitious plans for housing through the Economic Regeneration Delivery Plan. This
has been further strengthened through The Plan for North Lanarkshire approved in
March 2019 and revised in March 2023 with the Programme of Work through the
Transforming Places theme with a renewed focus on transforming town centres and
communities, creating places with high-quality homes and vibrant town centres. 
1.7 Significant progress to date includes:
• An increase in the target for new supply housing from 2,150 by 2027 to 5,000 by
2035, 
• Completion of 1,138 new build homes with a further 451 on site. Sites have been
identified and are at various stages of progression for a further 1,289 homes,
• Expansion of the buy back scheme with 689 homes purchased through the Council
Buy Back Schemes at 14 September 2023,
• The approval, development and ongoing delivery of plans for investment and re-
provisioning of the Council’s tower properties,
• Approval of a 5 year mainstream capital programme from 2021/22 to 2025/26 that
aims to deliver £354m of investment in the Council’s housing stock; greater than
20% increase from the previous 5 year planning period. 
30-year Business Plan
1.8 The 30-year Business Plan included as part of the 2024/25 budget setting process is
shown in Appendix 3. Finance has worked closely with Housing Property Services and
the New Supply Team to confirm future investment targets to support the development
and refinement of financial modelling. The 30-year Business Plan continues to
demonstrate affordability and sustainability of plans based current assumptions. 
Housing Benefit / Universal Credit
1.9 During the mid point of the current financial year, North Lanarkshire had over 24,000
tenants in receipt of some form of support for their housing costs, representing almost
69% of tenants. Almost 38% of tenants are now in receipt of the housing cost element
of Universal Credit and a further 31% are in receipt of Housing Benefit.   
1.10  A rent increase would result in some tenants receiving more Housing Benefit and some
existing non-claimants becoming entitled to Housing Benefit. However, unless their
circumstances change, most tenants will be liable for the same contribution towards
their rent, with Housing Benefit making up the difference. 
Page 110 of 196

Page 111

1.11  Tenants currently entitled to the full housing cost element of Universal Credit would
have their Universal Credit payment uplifted to reflect any rent increases up to the Local
Housing Allowance cap. 
1.12 Following approval at the former Housing and Regeneration Committee in November
2019, the Council established the Universal Credit Assistance Fund (UCAF). Following
approval at this Committee in February 2023 the scheme evolved into the current Rent
Assistance Fund. Over 10,000 tenants have been supported that would otherwise have
fallen into arrears. In addition, in accessing these funds tenants have been provided
with additional support and advice and signposting to other agencies where required
ultimately contributing to longer term sustainability of tenancies.   
1.13  These measures have ensured the Council has seen a stable position for rent arrears
for current tenants with the arrears balance remaining largely unchanged throughout
the current financial year where other landlords are experiencing significant increases
in current tenant arrears. 
2. Report 
HRA Revenue Estimates
2.1 In assessing the budgetary requirements of the Housing Revenue Account for 2024/25,
a number of variables and factors have to be considered and analysed before
determining the adjustments required in the base budget position. These base budget
adjustments are outlined in Appendices 1 and 2, with the main factors described below: 
2.1.1 Cost Pressures of £17.814m to ensure that the HRA can continue to deliver a
highly performing repairs and maintenance programme, effective housing
management and support and deliver the approved capital programme,
including:
• Employee costs (£0.746m)
The anticipated cost pressure for employee costs incorporates a re-
baselining for the 2023/24 current pay negotiations as well as an allowance
for a further 3% increase for 2024/25.  This is partially offset by an anticipate
increase to the turnover savings to reflect the significant levels of vacancies
experienced by the housing service. 
• Reduced employer pension contributions (£2.591m)
It is however anticipated that a one-off saving of £2.591 will materialise for
2024/25 as a result of the Actuarial Valuation of the Strathclyde Pension
Fund concluding that the fund is 146% funded allowing the employer
pension contribution rate to be reduced for 2 years.  The £2.591m is non-
recurring therefore a recurring solution for this would need to be identified
in future years.   
• Housing Repair and Maintenance (£6.830m)
The Council’s repairs programme is delivered by external contractors. The
contracts are indexed to inflation to reflect changes in the price of materials,
labour etc. The Enterprise Contract which is currently going through the
procurement process is anticipated to be in place from the new financial
year.  This cost estimate builds in an assumption around the potential rates
given the significant levels of inflation experienced within the construction
industry at the moment. 
Page 111 of 196

Page 112

• Loan charges (£10.174m)
With increases to the Bank of England base rate, the cost of borrowing is
increasing which will make the repayment of historic HRA capital borrowing
more expensive. This cost pressure is based on an assumption that the
repayment of debt will be at 4.75% however there is a risk that for one year
in 24/25 the rates will be higher at 5.5%. For the purposes of setting rent
for 24/25 this has been excluded and can be managed through reserves. 
• Other inflationary pressures for energy and other services (£1.510m) 
• Reversal of prior year Use of Reserves (£3.088m) 
• Housing Stock Profile (£1.943m)
Changes in the profiling of stock during the year including additional units
and progression through the tower reprovisioning programme has resulted
in a recurring benefit of additional income of £1.943m. 
2.1.2 Base Budget Savings are considered each year to ensure that the HRA
continues to direct its resources towards key priorities. Appendix 2 outlines base
budget savings of £1.165m to be implemented by the service in 2024/25. 
2.1.4 The combined impact of these cost pressures and partially offsetting savings is
a funding gap of £16.649m. This can be summarised as follows: 
£m
Cost Pressures (see Appendix 1) 17.814
Base Budget Savings (see Appendix 2) (1.165)  
Funding Gap 16.649 
2.2 A rental increase of 11.11% would be required to bridge the funding gap. 
2.3 There is an opportunity to make an adjustment to the profile of capital financing within
the HRA between borrowing and Capital Funded from Current Revenue (CFCR). Given
the significant cost pressures facing the HRA it has been determined that there should
be a reduction of £9.084m in CFCR from £27.146m to £18.062m in 2024/25. This would
reduce the rent rise required in 2024/25 to 5%. 
2.4 It should be noted that this will result in additional recurring revenue costs of c. £0.591m
from 2025/26. To maintain this rent increase level beyond 2024/25, a further £4.287m
CFCR reduction would be required in 2025/26.  Members should note that this
mechanism will increase the future borrowing requirement and expose the HRA to more
expensive borrowing to support its capital investment however this has been deemed
to be a prudent adjustment given the significant cost pressures faced by the HRA.   
Use of Surplus Balances
2.5 As part of its long-term HRA budget strategy, it is the Council’s policy to set aside
approximately 1% of the HRA budget as a core reserve. As a result, the core reserve
currently stands at £1.640m. 
2.6 Based on the Period 6 Budget Monitoring position, the projected HRA reserves position
at 31 March 2024 can be summarised as follows: 
Page 112 of 196

Page 113

£m
Earmarked Reserves 9.981
Core Contingency Reserve 1.640
Unallocated Reserve 5.312
Total Projected at 31 March 2024 16.933 
2.7 There will be a requirement to support a peak in loan charges expected in 2024/25 from
reserves. This would require funding of around £3.700m from the Unallocated Reserve.
In addition, there are continuing risks to the HRA from uncertainty within the wider
economy and the impact of inflation on repairs and maintenance costs and interest
rates on the cost of borrowing. 
2.8 Elected Members are reminded of the Council’s Reserves Policy approved at Policy
and Strategy Committee in January 2020 which aims to ensure that available balances
are managed and utilised in accordance with effective governance principles and
continue to support financial plans which are affordable and sustainable. 
3. Measures of success 
3.1  The Council is required to set a balanced budget for the Housing Revenue Account
with expenditure plans fully funded by income, largely from housing rents. 
3.2 The setting of an annual budget and thereafter monitoring the budget ensures that
tenants can have confidence that the Council and its officers are accountable for the
spending decisions they make. 
4. Supporting documentation  
Appendix 1  Cost Pressures 2024/25 
Appendix 2 Base Budget Savings 2024/25 
Appendix 3  30-year Business Plan Summary 
Elaine Kemp
Chief Officer (Finance) 
Page 113 of 196

Page 114

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The HRA budget for 2024/25 will ensure that the Council can continue to provide a
highly effective and responsive housing management service for all tenants and
improve the health and wellbeing and economic outcomes of communities through
the delivery of significant additional capital investment in high quality and affordable
social housing. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The financial implications of the 2024/25 Revenue Estimates are outlined throughout
the report.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐
Page 114 of 196

Page 115

If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All activities undertaken by the council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy (September 2012), Services
manage these as part of their overall corporate and service planning process. The
current economic climate, in particular, has the potential to impact upon the Council’s
ability to provide quality services within approved budget levels.  
The Government’s proposals for welfare reform include a number of changes to the
housing benefit system which present significant financial risks to the HRA, including
increasing rent arrears and cash collection costs, combined with lower levels of
rental income. These risks are increased by the current cost-of-living crisis. These
risks will be closely monitored throughout 2024/25 through the Council’s Financial
Sustainability risk.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Page 115 of 196

Page 116

Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 116 of 196

Page 117

Appendix 1
Housing Revenue Account 
Cost Pressures 2024/25 
£000 £000
Employee Costs  
Pay awards (2023/24 balance plus 2024/25 estimate)  1,220 
Incremental drift 26 
Increase in turnover vacancies (500) 
746   
Reduction in employers pension contribution  (2,591)   
Inflationary Pressures  
Housing repairs inflation and stock movements 6,830 
Trading and support service costs  467 
Energy costs 594 
Future credit losses 1,129 
Release of Ambition funding (733) 
Void rent loss increased costs 53 
8,340   
Capital Financing Costs  
Loan charges associated with increased capital
investment 
10,174   
Movement and profile of housing stock  (1,943)   
Reversal of prior year Use of Reserves  3,088   
Cost Pressures Total  17,814 
Page 117 of 196

Page 118

Appendix 2
Housing Revenue Account
Base Budget Savings 2024/25 
£000
Employee Costs
Reduced costs associated with former employee pensions 
110
Property Costs
Reduced home loss and disturbance payments linked to
the Phase 2 Tower and Walk Up Flat reprovisioning
programme
95
Other Operational Efficiencies
Reduced operational delivery costs linked to office
expenditure and recharges from other service areas (i.e.
HRA share of wider operational efficiencies across the
Council) 
960
Total base budget savings 1,165 
Page 118 of 196

Page 119

Appendix 3 
30 Year Financial Model 2023/24 Revenue Estimates 
30 Year
Year 2020/25 2025/30 2030/35 2035/40 2040/45 2045/50 Totals
Average Mainstream Housing Stock 35,036 34,172 33,404 32,514 31,894 31,839
New Build Housing Stock 1,237 2,239 3,036 3,329 3,372 3,362
Average Housing stock 36,273 36,412 36,440 35,843 35,266 35,201
Capital Investment £000 £000 £000 £000 £000 £000 £000
Prudential borrowing 319,275 591,893 620,251 644,687 832,579 443,366 3,452,051
Capital receipts 41 0 0 0 0 0 41
Other receipts / Government Grants 112,836 109,690 63,782 4,868 0 0 291,176
Sub total 432,152 701,583 684,033 649,555 832,579 443,366 3,743,268
CFCR 129,220 96,682 121,396 135,729 135,731 135,730 754,488
Total resources 561,372 798,265 805,429 785,284 968,310 579,096 4,497,756
Loan Analysis
Opening debt 324,109 602,643 1,101,589 1,561,575 1,958,196 2,465,582 324,109
Prudential borrowing 319,275 591,893 620,251 644,687 832,579 443,366 3,452,052
Principal repayment - historic debt 35,018 51,654 62,434 75,517 51,354 30,382 306,359
Principal repayment - new borrowing 5,723 41,293 97,831 172,549 273,839 404,971 996,206
Closing debt 602,643 1,101,589 1,561,575 1,958,196 2,465,582 2,473,595 2,473,596
Per house (£) - Closing Stock 16,614 30,254 42,853 54,633 69,914 70,271 70,271
Housing Revenue Account
135,273 282,533 449,214 657,620 862,465 1,097,968 3,485,073
663,461 720,346 823,383 923,435 1,019,725 1,139,145 5,289,495
798,734 1,002,879 1,272,597 1,581,055 1,882,190 2,237,113 8,774,568
Other income (87,663) (80,545) (80,545) (80,545) (80,545) (80,545) (490,388)
Balance to be financed by rents 711,071 922,334 1,192,052 1,500,510 1,801,645 2,156,568 8,284,180
Average weekly rent (£) 78.15 98.98 126.91 161.97 196.78 235.62
Rental Income 711,069 922,334 1,192,050 1,500,511 1,801,646 2,156,572 8,284,182
Average Yearly % increase 4.58% 5.00% 5.00% 4.53% 3.92% 2.96%
Capital charges as a % of rent income 19.02% 30.63% 37.68% 43.83% 47.87% 50.91%
5 Year Bands
Loan charges
Other costs
Page 119 of 196

Page 120

Page 120 of 196

Page 121

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    SL/TH Date 08/11/23 
Scottish Housing Regulator: 2022/23 Landlord Report 
From  Stephen Llewellyn, Chief Officer (Housing Management)  
E-mail llewellyns@northlan.gov.uk Telephone  01698 274192 
1. Background 
1.1 The SHR and the SSHC were enacted by the Housing (Scotland) Act 2010, which
required Ministers to set standards and outcomes that social landlords should be
achieving for tenants and other customers through their housing activities. The Act also
established the SHR as an independent Regulator directly accountable to the Scottish
Parliament.  Scottish social housing landlords significantly vary in stock size from 1 to
42,718 properties. 
1.2 The SHR requires social landlords to collect and provide key information on their
performance in achieving the SSHC outcomes and standards in an Annual Return on
Executive Summary
This report is to advise committee of the Landlord Report published by the Scottish Housing
Regulator (SHR) which shows Scotland’s social landlords’ performance for both Local
Authorities and Registered Social Landlords (RSL’s) against the Scottish Social Housing
Charter (SSHC). 
Recommendations
It is recommended that the Housing Committee: 
1) Acknowledge the content of this report and the link to the Landlord Report provided
by the SHR in section 4 which identifies North Lanarkshire Council’s performance in
relation to the SSHC. 
2) Acknowldges the progress being made in the production of our annual report to
tenants. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth
Programme of Work Statutory / corporate / service requirement
Item 13
Page 121 of 196

Page 122

the Charter (ARC).  Returns are required by 31 May each year.  Landlords also have a
duty to publish a performance report, which requires to be made available to all tenants. 
1.3 In addition, all landlords have a legal requirement to submit a signed Annual Assurance
Statement to the Regulator by 31 October each year.  A separate report on this was
presented and approved by Committee on 30 August 2023. 
1.4 Following submission of each local authority and RSL’s ARC, the SHR publish a
landlord profile of all social landlords, which allows tenants to compare landlord’s
performance across Scotland. In addition, a Landlord Report is produced by the SHR
which reports on indicators within five main categories: 
• Homes and Rents
• Tenant Satisfaction
• Quality and Maintenance of Homes
• Neighbourhoods
• Value for Money 
These areas for reporting were agreed by the SHR through significant consultation with
tenants. These indicators require to be set in context as detailed in this report. 
1.5 The SHR publishes individual Engagement Plans in April each year for all social
landlords highlighting any areas of service they will focus on, to work with the local
authority concerned. The Engagement Plan for our service does not report any current
areas of concern, but highlights the service areas which the Regulator monitors across
organisations. 
2. Report 
2.1 On 31 August 2023, the SHR published its tenth Landlord Report reflecting the
performance reported in each authority's completed ARC. At the time of writing this
report, the Landlord Report has not been published as a separate document, but
instead shows on the SHR’s webpage, therefore a link to the report for North
Lanarkshire is included in section 4 of this report. 
2.2 Landlord report categories 
A summary of the performance figures from the five main areas detailed within the
Landlord Report are shown below. 
Homes and rents 
2.2.1 This report indicates that the council are performing better than the Scottish average
in several areas reported. Average weekly rents are well below the Scottish average.
The average rent for all North Lanarkshire properties, as reported in the ARC return
for 2022/23, was £76.95 per week.  When compared to others using the dataset
available, this compares extremely favourably with the reported Scottish average
for all landlords of £87.59.
Tenant satisfaction 
2.2.2 Our last tenant satisfaction survey was completed in August 2021 via telephone as
opposed to the face-to-face interviews we have used previously.  This change was
Page 122 of 196

Page 123

necessitated by Covid restrictions which were still in place. Our performance continues
to be strong despite the impact on services from Covid, and for the majority of our
satisfaction indicators we are performing better than the Scottish average. 
2.2.3 The 2021 survey results have been reported in the ARC for two consecutive years.
Survey results are permitted to be submitted for a maximum of 3 years. A new tenant
survey was conducted throughout August 2023 the results of which will be reported in
our 2023/24 ARC and are part of a separate report to Committee this cycle, which
overall is showing an improving situation for North Lanarkshire. 
2.2.4 Overall satisfaction in the 2021 survey was 81.2% which was a 9.8% decrease on our
previous survey in 2018 and 6.5% lower than the national average of 87.7% in 2021/22.
The national average for 2022/23 has fallen by 1% to 86.7%. It is likely that overall
satisfaction decreased as a consequence of general disruption to all council services
being halted or impacted by Covid restrictions, rather than a decrease in satisfaction
solely with Housing and Property services. 
Quality and maintenance of homes 
2.2.5 The percentage of homes meeting the Scottish Housing Quality Standard was 80.4%,
this is a rise of 10% on the 2021/22 figure and compares favourably to the Scottish
average of 79% and Local Authority average of 70.9%. 
2.2.6 Our time taken to complete emergency repairs was 3.3 hours on average, compared
to a Scottish average of 4.2 hours, and our time taken to complete non-emergency
repairs was 6.8 days compared to the Scottish average of 8.7 days.  97.3% of reactive
repairs were completed “right first time” compared to the Scottish average of 87.8%.
The positive results achieved in this area of work reflect an element of focussed activity
which has taken place to further enhance ‘right first-time’ outcomes, and to ensure
service providers consistently exceed target timescales. 
2.2.7 Satisfaction levels with the service received, for tenants who had repairs carried out
rose to 95.2% this year, which again compares favourably with the Scottish average of
88%. 
Neighbourhoods 
2.2.8 For cases of anti-social behaviour reported in the last year, 97.7% were resolved at the
year end and within the locally agreed targets, this was higher than the Scottish average
of 94.2%.  The remaining 2.3% of cases not resolved at year end were carried forward
to the following year and resolved within locally agreed targets in 2023/24.  We
therefore performed at 100% compliance for the targets agreed for the management of
anti-social behaviour within the service. 
Value for money 
2.2.9 Our rent collection levels for 2022/23 were 98.9% which is 1.7% more than our 2020/21
performance. Our housing Central Rents team continue to secure more direct Universal
Credit payments and pursue other non-Universal Credit tenant debt which has had a
positive impact on the overall arrears’ levels. We also introduced the Rent Assistance
Fund for our tenants as approved by Committee on 15 February 2023, to assist tenants
falling into rent arrears and to encourage engagement from service users which also
allows staff to work with and provide wider income maximisation services. To date the
service has provided almost £495,000 in support to our tenants through the Rent
Assistance Fund. 
Page 123 of 196

Page 124

2.2.10 Our average days to re-let homes increased by 0.5 days to 32.3 days during the year,
this mainly being due to shortages in supply of materials, and difficulties with
recruitment and workforce retention being experienced by our contractors and also due
to delays with power companies dealing with meter issues. However, while we saw a
slight increase in our outturn we continue to perform well when compared to the
Scottish average of 55.6 days, which rose by 4 days on the 2021/22 performance. Our
housing solutions and repairs teams are working together and liaising closely with our
contractors to continually improve these timescales with a view to bringing our
performance back to pre-pandemic levels. 
2.2.11 Monitoring rent loss continues to be a priority for our service with our void rent loss
reported at 0.9%, which compares favourably to the Scottish average of 1.4%. 
Annual performance report 
2.3 In line with the SHR requirements placed on the council to provide a report to tenants
advising of performance against the SSHC, a group of tenant representatives have
been working to review the performance data and to agree the content and format for
the annual performance report. The timescale for publishing the report is 31 October
each year.  A link to the annual performance report will be made available to all
Members on publication. 
3. Measures of success 
3.1  All indicators reported on through the SSHC and ARC are included as a standard
agenda item on each of the Housing Improvement Team meetings and Property
Progress Team meetings that operate across all service areas within both Housing
Solutions and Housing Property and Projects respectively. These teams continue to
review practices, procedures, and customer feedback to ensure that high standards of
service delivery are achieved in all areas.     
4. Supporting documentation 
4.1  There are no supporting documents, however, the full Landlord Report data is
provided on the following link to the Regulators website. 
Stephen Llewellyn
Chief Officer (Housing Management)
Page 124 of 196

Page 125

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
The council has a legal obligation to provide an Annual Return on the Scottish
Social Housing Charter to the Scottish Housing Regulator. The Landlord Report is
produced following the submission of this return. Failure to provide the return would
be a breach of the Council’s statutory obligations. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Page 125 of 196

Page 126

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The Landlord Report produced by the Scottish Housing Regulator is published and
available for the public, failure to provide satisfactory services would present
reputational risk for the service and the council. The service have identified all work
in relation to the Scottish Housing Regulator as a Risk within the Service Risk
Management Plan.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☒ No ☐ 
Page 126 of 196

Page 127

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  SL Date 08/11/23 
Strategic Performance Framework - latest performance results for
Housing Management 
From  Stephen Llewellyn, Chief Officer (Housing Management)  
E-mail LlewellynS@northlan.gov.uk Telephone 01698 274192 
1. Background 
1.1 There are six inter-related strategic frameworks which are key to assessing the success
of The Plan for North Lanarkshire and monitoring delivery towards achieving the overall
vision by ensuring each stage is appropriately aligned, planned, guided, implemented,
and governed.   
1.2 The six frameworks focus on ensuring a corporate one council approach in respect of
Policy, Governance, Performance, Self-Evaluation, Project Management, and
Demonstrating Improved Outcomes for Communities.   
Executive Summary 
The purpose of this report is to highlight the 2022/23 year end performance and the
2023/24 year to date performance of the Housing Management service for the performance
indicators detailed at Appendix 1. 
Recommendations 
It is recommended that the Housing Committee: 
1) Review the high-level performance overview presented in Appendix 1, and the
supporting data contained within the linked Excel spreadsheet and identify where
further information is required to understand or investigate performance further. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 14(a)
Page 127 of 196

Page 128

1.3 The Strategic Performance Framework comprises
performance measurement at three levels (as per the diagram
on the right).  This aims to collectively provide an overview of
performance to help understand the impact of council activities
on improving services and outcomes for the people and
communities of North Lanarkshire.  The measures in this
Framework allow for day to day activities, and progress
towards achieving the long-term vision set out in The Plan for
North Lanarkshire, to be regularly monitored, reported,
assessed, and scrutinised.   
1.4 The Strategic Performance Framework is aligned to the Accounts Commission 
statutory direction which places a requirement on councils to report a range of
information in terms of (1) improving local services and outcomes, and (2)
demonstrating Best Value.  Key points of note in this respect are that the Accounts
Commission also expect to see: 
(a) A balance in reporting areas of improvement that have been achieved and not
achieved.
(b) Reporting that is undertaken in a timely manner.
(c) Easy access to performance information for all citizens and communities. 
1.5 A Performance Reporting Schedule supports the timely submission of a range of
performance information that facilitates Elected Members and senior management to
undertake regular performance reviews that inform scrutiny, challenge, and decision
making processes.  This Schedule, endorsed by the Audit and Scrutiny Panel in
February 2023, includes Chief Officer’s individual six monthly Performance Reviews at
Service Committees in line with the Strategic Performance Framework. 
1.6 This report therefore presents the Housing Committee with the latest performance
results for Housing Management for Members’ further review and scrutiny. 
2. Strategic Performance Framework 
Housing Committee responsibilities 
2.1 In line with the terms of reference outlined in the Scheme of Administration, the Housing
Committee is responsible for monitoring and reviewing performance information for the
following Ambition Statements from The Plan for North Lanarkshire: 
1. Ensure a housing mix that supports social inclusion and economic growth. 
2.2 The high-level performance overview in Appendix 1 presents Members with a summary
of the latest results for each performance indicator within the remit of the Chief Officer
(Housing Management). 
2.3 The information in Appendix 1 comprises the following: 
• An ideal direction arrow - this indicates whether a higher or lower figure is the
preferred direction of travel.   
• Measurement unit - for example whether the result is a %, a number, a unit cost
(in £), or a ratio.
 A higher figure is better
 A lower figure is better
Page 128 of 196

Page 129

• Performance results for the last five financial years (depending on availability of
data) along with the latest year’s target and corresponding RAG status (for
indicators where it is appropriate to set targets).   
• The most recent monthly or quarterly results, along with the corresponding target
and RAG status.  Note the inclusion of this information is dependent on the
measurement frequency of the indicator and availability of data as at the time of
reporting. 
• A trend graph - this captures the direction of travel achieved over the five financial
years and includes the most recent monthly or quarterly results where available.
• Comments - narrative summarising the current position and providing an
explanation for any significant variations in performance.  Where applicable, this
narrative also highlights the effect of the pandemic on service delivery, e.g. any
increase or decrease in the volume of transactions or enquiries processed. 
2.4 A large volume of data supports the high-level performance overview in Appendix 1. 
This is outlined in the latest performance results for Housing Management Excel
spreadsheet which is available through the following link for Members to carry out a
deep dive and review and scrutinise each performance indicator further.  The Menu on
the second tab of the spreadsheet contains built in hyperlinks that automatically take
the user to a tab for each performance indicator and therefore provides a useful
navigation aid to review the contents of the file.
• Latest performance results for Housing Management.xlsx 
Current context 
2.5 The financial pressures experienced by our tenants due to the rise in the cost of living
is a priority for our service. The Rent Assistance Fund, introduced in February 2023,
aims to help council tenants who may be on low-incomes, and also others who may be
on universal credit. The rent assistance fund seeks to ensure tenancy levels are
maintained despite the challenges faced by cost of living increases. Our dedicated
Income Maximisers who help support our tenants can also identify any additional
financial assistance they might be entitled to. Last year the team secured over 14 million
pounds in additional income for our tenants and this assistance resulted in more
positive outcomes for our tenants. 
Last year saw us welcome families escaping the conflict in Ukraine, rehousing 200
families in the two tower blocks in Coatbridge and Wishaw. The families are settling
well into their new communities and have been assisted by our tenant participation
team to set up a tenants and resident groups. 
A new Tenant Survey was commissioned, going back to the face to face method we
used prior to the pandemic. The results of which are positive and reported in a separate
report to this committee. 
Recent performance highlights 
2.6 Performance across the service remains strong. Rent arrears reduced last year from
7.6% in 2021/22 to 7.3%, 1.7% below our 9% target and well below the 9.6% Scottish
Local Authority Average. Similarly rent collection levels increased by over 1% on the
previous year at 98.9% and remains above the Scottish Local Authority Average of
Key to RAG status
Green Performance is on target and/or within acceptable thresholds
Red Performance does not meet target and is outwith acceptable thresholds
Blue Performance surpasses the target and exceeds expectations
Page 129 of 196

Page 130

98.8%. Much of this success is due to the increased levels of positive engagement staff
are having with tenants as a result of the introduction of the Rent Assistance Fund. The
percentage of rent lost through properties being empty also improved in 2022/23 to
0.89% from 1% reported in 20212/22, and below the 1% target. We also perform well
in this indicator against the Scottish Local Authority Average of 1.7%. Tenancy
sustainment increased to 91% in 2022/23, slightly better than our 2021/22 outturn of
90.92% and in line with the Scottish Local Authority Average of 91.4%. 
Our percentage lets to homeless in 2022/23 was 40.5% of all lets made in the year,
over 3% higher than our 37% target. Year to date we have met a similar percentage at
40.3%. This higher percentage of lets has increased because of a higher level of
homeless presentations experienced in the past 12 to 18 months. The percentage of
decisions made within 28 days for households under 25 years old presenting as
homeless was 97% which was better than our 95% target. We continue to achieve high
levels of satisfaction with the quality of temporary accommodation at 96.3%, 2.3%
above our target of 94%, year to date we see the same levels of satisfaction. This
satisfaction is due to the overall good quality of the accommodation provided, including
the furnishing and fixtures, as well as the high level of decoration within the properties. 
Areas of performance requiring improvement 
2.7 The percentage of decisions made within 28 days for all households presenting as
homeless is 94.7% which is slightly below our target of 95%, however, our average
time to make these decisions is 19 days. This performance compares favourably with
the Scottish Local Authority Average of 21 days. Our performance in this area can be
affected by the transient nature of the client group, where maintaining contact to allow
staff to make decisions within timescale can be difficult. 
The average number of days to re let properties has increased to 32.3 days, up 0.5
days on the 2021/22 outturn. However, our performance remains strong in comparison
to the Scottish Average of 55.6 days. This increase has been due to a number of
factors, such as delays with power companies and also labour and material issues with
our main repair contractors. Year to date the days to let has increased further to 35.9
days this is as a result of properties which have been delayed for the above reasons
now beginning to be re let. 
Next steps 
2.8 As noted in paragraph 1.5, the Strategic Performance Framework is supported by a
Performance Reporting Schedule.  This sets out the arrangements for service,
statutory, and Strategic Performance Framework reporting to committee.  In this
respect the relevant Committee can expect to receive the following in respect of
Housing Management areas of work during 2023/24. 
Report Description Committee Committee
cycle
Scottish
Housing
Regulator:
annual
landlord report 
This report presents the annual landlord
report published by the Scottish Housing
Regulator (SHR) which shows Scotland’s
social landlords’ performance for both
Local Authorities and Registered Social
Landlords (RSL’s) against the Scottish
Social Housing Charter (SSHC).
Housing
Committee
Cycle 4 in
2023
Scottish
Housing
Regulator:
Since April 2019, Social Landlords in
Scotland are required to advise the
Scottish Housing Regulator (SHR) if they
Housing
Committee
Cycle 3 in
2023
Page 130 of 196

Page 131

Annual
Assurance
Statement 
meet the regulatory standards and
requirements by submitting an Annual
Assurance Statement between April and
October each year.
Each landlord should confirm in its
Statement its level of compliance with all
of the relevant requirements at section 3
of the Regulatory Framework.  
The SHR assesses each Statement as
part of their regulatory risk assessment
and publishes an engagement plan for
each landlord.  From March 2021, RSL
engagement plans include a regulatory
status which is the SHR judgment on
whether the RSL complies with regulatory
standards and requirements.
• Latest report in August 2023:
https://mars.northlanarkshire.gov.uk/egenda/imag
es/att101119.pdf 
Annual
housing /
Scottish Social
Housing
Charter
performance
report 
The annual performance report to tenants
is designed to keep tenants, service
users, and other customers informed of
council performance and how the council
is progressing towards meeting the
outcomes of the Scottish Social Housing
Charter (SSHC).
n/a, published on the
council’s website in the
autumn each year
Community
safety CCTV
performance 
This report provided a one off update on
the performance of the Community Safety
Hub following its merger into Housing.
Moving forward this report will be
incorporated into the service’s programme
of annual service performance reports.
• Latest report in May 2023:
https://mars.northlanarkshire.gov.uk/egenda/imag
es/att100529.pdf 
Housing
Committee
Cycle 2 in
2023
Homeless
performance
and processes 
This report provided a one off update in
terms of performance in relation to the
provision of homelessness services which
continued to be delivered throughout the
pandemic and, despite the challenges the
pandemic brought, highlights many areas
of improved performance.
Moving forward this report will be
incorporated into the service’s programme
of annual service performance reports.
Housing
Committee
Cycle 4 in
2023 
3. Measures of success 
3.1  Measures of success include:
• Regular oversight and monitoring of performance across the organisation to gain
assurances in terms of governance and accountability.
• Regular review and challenge processes to scrutinise the performance of the
council to ensure effective use of resources and that resources are directed in
accordance with agreed policy and according to priorities, while ensuring sound
decision making and clear accountability for the use of resources in achieving
improved outcomes for service users and the local community.  
• Performance monitoring, management, and reporting arrangements that support
the demonstration of improved performance in local services and outcomes, and
the delivery of Best Value. 
Page 131 of 196

Page 132

4. Supporting documentation 
4.1 Appendix 1 -  High-level performance overview 
Stephen Llewellyn
Chief Officer (Housing Management) 
Page 132 of 196

Page 133

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 133 of 196

Page 134

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 134 of 196

Page 135

Appendix 1
Housing Management
High-level performance overview - as at September 2023 
Page 135 of 196

Page 136

Page 136 of 196

Page 137

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  BL Date 08/11/23 
Strategic Performance Framework - latest performance results for
Housing Property Services 
From  Brian Lafferty, Chief Officer (Housing Property Services)  
E-mail LaffertyB@northlan.gov.uk Telephone 01698 524758 
1. Background 
1.1 There are six inter-related strategic frameworks which are key to assessing the success
of The Plan for North Lanarkshire and monitoring delivery towards achieving the overall
vision by ensuring each stage is appropriately aligned, planned, guided, implemented,
and governed.   
1.2 The six frameworks focus on ensuring a corporate one
council approach in respect of Policy, Governance,
Performance, Self-Evaluation, Project Management, and
Demonstrating Improved Outcomes for Communities.   
1.3 The Strategic Performance Framework comprises
performance measurement at three levels (as per the
diagram on the right).  This aims to collectively provide an
overview of performance to help understand the impact of
Executive Summary
The purpose of this report is to highlight the 2023/24 year to date on performance of the
Housing Property Services for the performance indicators at Appendix 1. 
Recommendations 
It is recommended that the Housing Committee: 
1) Review the high-level performance overview presented in Appendix 1, and the
supporting data contained within the linked Excel spreadsheet and identify where
further information is required to understand or investigate performance further. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 14(b)
Page 137 of 196

Page 138

council activities on improving services and outcomes for the people and communities
of North Lanarkshire.  The measures in this Framework allow for day to day activities,
and progress towards achieving the long-term vision set out in The Plan for North
Lanarkshire, to be regularly monitored, reported, assessed, and scrutinised.   
1.4 The Strategic Performance Framework is aligned to the Accounts Commission 
statutory direction which places a requirement on councils to report a range of
information in terms of (1) improving local services and outcomes, and (2)
demonstrating Best Value.  Key points of note in this respect are that the Accounts
Commission also expect to see: 
(a) A balance in reporting areas of improvement that have been achieved and not
achieved.
(b) Reporting that is undertaken in a timely manner.
(c) Easy access to performance information for all citizens and communities. 
1.5 A Performance Reporting Schedule supports the timely submission of a range of
performance information that facilitates Elected Members and senior management to
undertake regular performance reviews that inform scrutiny, challenge, and decision
making processes.  This Schedule, endorsed by the Audit and Scrutiny Panel in
February 2023, includes Chief Officer’s individual six monthly Performance Reviews at
Service Committees in line with the Strategic Performance Framework. 
1.6 This report therefore presents the Housing Committee with the latest performance
results for Housing Property Services for Members’ further review and scrutiny. 
2. Strategic Performance Framework 
Housing Committee responsibilities 
2.1 In line with the terms of reference outlined in the Scheme of Administration, the Housing
Committee is responsible for monitoring and reviewing performance information for the
following Ambition Statements from The Plan for North Lanarkshire: 
1. Ensure a housing mix that supports social inclusion and economic growth.
22.    Facilitate a North Lanarkshire wide approach to asset rationalisation, including
with communities and partners. 
2.2 The high-level performance overview in Appendix 1 presents Members with a summary
of the latest results for each performance indicator within the remit of the Chief Officer
(Housing Property Services). 
2.3 The information in Appendix 1 comprises the following: 
• An ideal direction arrow - this indicates whether a higher or lower figure is the
preferred direction of travel.   
• Measurement unit - for example whether the result is a %, a number, a unit cost
(in £), or a ratio.
• Performance results for the last five financial years (depending on availability of
data) along with the latest year’s target and corresponding RAG status (for
indicators where it is appropriate to set targets).  
 A higher figure is better
 A lower figure is better
Key to RAG status
Green Performance is on target and/or within acceptable thresholds
Page 138 of 196

Page 139

• The most recent monthly or quarterly results, along with the corresponding target
and RAG status.  Note the inclusion of this information is dependent on the
measurement frequency of the indicator and availability of data as at the time of
reporting. 
• A trend graph - this captures the direction of travel achieved over the five financial
years and includes the most recent monthly or quarterly results where available.
• Comments - narrative summarising the current position and providing an
explanation for any significant variations in performance.  Where applicable, this
narrative also highlights the effect of the pandemic on service delivery, e.g. any
increase or decrease in the volume of transactions or enquiries processed. 
2.4 A large volume of data supports the high-level performance overview in Appendix 1. 
This is outlined in the latest performance results for Housing Property Services
Excel spreadsheet which is available through the following link for Members to carry
out a deep dive and review and scrutinise each performance indicator further.  The
Menu on the second tab of the spreadsheet contains built in hyperlinks that
automatically take the user to a tab for each performance indicator and therefore
provides a useful navigation aid to review the contents of the file.
• Latest performance results for Housing Property Services.xlsx 
Current context 
2.5 Service pressures have been difficult and recruitment of relevant trades by our
contractors continue to have a direct impact on service delivery. 
Recent Performance highlights 
2.6 Our timescale for completing emergency repairs within our housing stock for all 3 linked
contractors, year to date, is 3.2 hours, below our 3.7 hours target for 2022/23. Our
performance for the non-emergency repairs is also below our 2022/23 target of 7 days
at 6.6 days. The percentage of reactive repairs carried out in the last year completed
right 1st time is also above our target of 96% at 97.45%. Our corporate property repairs
performance is strong across most indicators, with the percentage of emergency
repairs completed within timescale at 96.9% for 2022/23 and 97.8% year to date. The
percentage of routine repairs completed within timescale was above target at 98.5%
for 2022/23 and is continuing to improve at 98.9% year to date. The average time to
complete routine repairs was below the target of 9.9 days at 9.0 days for 2022/23, and
9.5 days year to date. 
Areas of performance requiring improvement 
2.7 The Corporate Property Repairs indicator for the average time in hours taken to
complete emergency repairs is 0.9 hours above the 3.3 hour target at 4.2 hours. This
is due to the materials and trades shortages. Remedial actions include having weekly
meetings with contractors where issues are highlighted at the earliest stage to allow
proactive resolution. A further issue is that our contractors’ new operatives are not
closing lines in the correct way and are receiving further training to improve this
process. 
Next steps 
Red Performance does not meet target and is outwith acceptable thresholds
Blue Performance surpasses the target and exceeds expectations
Page 139 of 196

Page 140

2.8 As noted in paragraph 1.5, the Strategic Performance Framework is supported by a
Performance Reporting Schedule.  This sets out the arrangements for service,
statutory, and Strategic Performance Framework reporting to committee.  In this
respect the relevant Committee can expect to receive the following in respect of
Housing Property Services areas of work during 2023/24. 
Report Description Committee Committee
cycle
Mears LLP  In 2010 Morrisons Facilities Services Ltd
successfully bid to become the council’s
strategic partner to deliver housing and
corporate repairs over a 10- year period
with the contract commencing on 21
January 2011. Mears PLC subsequently
bought Morrisons Facilities Services Ltd as
a going concern, so now own the 67%
shareholding in the Mears Scotland LLP
(Mears) strategic partnership and the
inherent North Lanarkshire service contract.
The council owns the remaining 33% of
Mears Scotland LLP. The contract expired
in January 2021 with extensions being
approved at Committee, with Mears now in
the third year, this commenced on 8
January 2023 to 7 January 2024.
• Latest report in August 2023:
https://mars.northlanarkshire.gov.uk/egenda/image
s/att101121.pdf 
Housing
Committee
Cycles 1 and
3
Saltire  Following approval by Committee in March
2017, the sale of the council’s 33%
shareholding in Saltire was concluded in
May 2017. The works agreement would
govern the Central Heating Repairs and
Maintenance Delivery service, also being
varied to maintain the benefits and
protections which the council had
previously enjoyed from its shareholding
until expiry on the contract in January 2021
and agreed extensions that have been
approved at Committee. In relation to the
contract extension, Saltire are now in the
third year, this commenced on 8 January
2023 to 7 January 2024.
• Latest report in August 2023:
https://mars.northlanarkshire.gov.uk/egenda/image
s/att101122.pdf 
Housing
Committee
Cycles 1 and
3
3. Measures of success 
3.1  Measures of success include:
• Regular oversight and monitoring of performance across the organisation to gain
assurances in terms of governance and accountability.
• Regular review and challenge processes to scrutinise the performance of the
council to ensure effective use of resources and that resources are directed in
accordance with agreed policy and according to priorities, while ensuring sound
decision making and clear accountability for the use of resources in achieving
improved outcomes for service users and the local community.  
• Performance monitoring, management, and reporting arrangements that support
Page 140 of 196

Page 141

the demonstration of improved performance in local services and outcomes, and
the delivery of Best Value. 
4. Supporting documentation 
4.1 Appendix 1 -  High-level performance overview 
Brian Lafferty
Chief Officer (Housing Property Services) 
Page 141 of 196

Page 142

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 142 of 196

Page 143

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 143 of 196

Page 144

Appendix 1
Housing Property Services
High-level performance overview - as at September 2023  
Page 144 of 196

Page 145

Page 145 of 196

Page 146

Page 146 of 196

Page 147

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  PH Date 08/11/23 
Strategic Performance Framework - latest performance results for
Place - housing development 
From  Pamela Humphries, Chief Officer (Place)  
E-mail HumphriesP@northlan.gov.uk Telephone 07939 280710 
1. Background 
1.1 There are six inter-related strategic frameworks which are key to assessing the success
of The Plan for North Lanarkshire and monitoring delivery towards achieving the overall
vision by ensuring each stage is appropriately aligned, planned, guided, implemented,
and governed.   
1.2 The six frameworks focus on ensuring a corporate one council approach in respect of
Policy, Governance, Performance, Self-Evaluation, Project Management, and
Demonstrating Improved Outcomes for Communities.   
Executive Summary
The purpose of this report is to highlight the 2022/23 year end performance and the
2023/24 year to date performance of the Place Service in relation to the performance
indicators detailed at Appendix 1 for new housing development 
Recommendations 
It is recommended that the Housing Committee: 
1) Review the high-level performance overview presented in Appendix 1, and the
supporting data contained within the linked Excel spreadsheet, and identify if further
information is required to understand or investigate performance further. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 14(c)
Page 147 of 196

Page 148

1.3 The Strategic Performance Framework comprises
performance measurement at three levels (as per the diagram
on the right).  This aims to collectively provide an overview of
performance to help understand the impact of council activities
on improving services and outcomes for the people and
communities of North Lanarkshire.  The measures in this
Framework allow for day to day activities, and progress
towards achieving the long-term vision set out in The Plan for
North Lanarkshire, to be regularly monitored, reported,
assessed, and scrutinised.   
1.4 The Strategic Performance Framework is aligned to the Accounts Commission 
statutory direction which places a requirement on councils to report a range of
information in terms of (1) improving local services and outcomes, and (2)
demonstrating Best Value.  Key points of note in this respect are that the Accounts
Commission also expect to see: 
(a) A balance in reporting areas of improvement that have been achieved and not
achieved.
(b) Reporting that is undertaken in a timely manner.
(c) Easy access to performance information for all citizens and communities. 
1.5 A Performance Reporting Schedule supports the timely submission of a range of
performance information that facilitates Elected Members and senior management to
undertake regular performance reviews that inform scrutiny, challenge, and decision
making processes.  This Schedule, endorsed by the Audit and Scrutiny Panel in
February 2023, includes Chief Officer’s individual six monthly Performance Reviews at
Service Committees in line with the Strategic Performance Framework. 
1.6 This report therefore presents the Housing Committee with the latest performance
results for Place (New Supply) for Members’ further review and scrutiny. 
2. Strategic Performance Framework 
Housing Committee responsibilities 
2.1 In line with the terms of reference outlined in the Scheme of Administration, the Housing
Committee is responsible for monitoring and reviewing performance information for the
following Ambition Statements from The Plan for North Lanarkshire: 
1. Ensure a housing mix that supports social inclusion and economic growth. 
2.2 The high-level performance overview in Appendix 1 presents Members with a summary
of the latest results for each performance indicator within the remit of the Chief Officer
(Place). 
2.3 The information in Appendix 1 comprises the following: 
• An ideal direction arrow - this indicates whether a higher or lower figure is the
preferred direction of travel.   
• Measurement unit - for example whether the result is a %, a number, a unit cost
(in £), or a ratio.
 A higher figure is better
 A lower figure is better
Page 148 of 196

Page 149

• Performance results for the last five financial years (depending on availability of
data) along with the latest year’s target and corresponding RAG status (for
indicators where it is appropriate to set targets).   
• The most recent monthly or quarterly results, along with the corresponding target
and RAG status.  Note the inclusion of this information is dependent on the
measurement frequency of the indicator and availability of data as at the time of
reporting. 
• A trend graph - this captures the direction of travel achieved over the five financial
years and includes the most recent monthly or quarterly results where available.
• Comments - narrative summarising the current position and providing an
explanation for any significant variations in performance.  Where applicable, this
narrative also highlights the effect of the pandemic on service delivery, e.g. any
increase or decrease in the volume of transactions or enquiries processed. 
2.4 A large volume of data supports the high-level performance overview in Appendix 1. 
This is outlined in the latest performance results for Place – housing development 
Excel spreadsheet which is available through the following link for Members to carry
out a deep dive and review and scrutinise each performance indicator further.  The
Menu on the second tab of the spreadsheet contains built in hyperlinks that
automatically take the user to a tab for each performance indicator and therefore
provides a useful navigation aid to review the contents of the file.
• Latest performance results for Place - housing development.xlsx 
Current context 
2.5 The Affordable Housing Supply Programme is delivered by the council and Registered
Local Landlords (RSLs) and supports the delivery of the council’s Local Housing
Strategy, with projects identified and approved through the Strategic Housing
Investment Plan (SHIP) which is approved annually by the Housing Committee.    The
delivery of the affordable housing supply programme (AHSP) continues to be impacted
by high cost inflation; increases in costs due to increased sustainability standards, and
ongoing challenges in the labour market and contractor capacity.   
Recent Performance highlights 
2.6 Despite on-going cost and delivery challenges the number of new build affordable
homes completed increased to 539 in 2022/23, well above the Local Housing Strategy
annual average target of 300.  The proportion of new build homes built to full wheelchair
standard also exceeded the target of 5% for housing association new build homes and
10% for council new build homes. 
Areas of performance requiring improvement  
2.7 While the council’s own new supply programme did not meet the original targets set for
2022/23 due to programme slippage on a number of sites and slow down in demand
for the Open Market Purchase Scheme (OMPS), it is likely that the programme will
exceed its out-put target for 2023/24 and is currently on track track to deliver a record
434 new homes this year (new build and OMPS).  It should however be noted that there
has also been slippage in the RSL new build programme with some projects not going
ahead due to increased costs.  This is likely to impact on the overall affordable housing
Key to RAG status
Green Performance is on target and/or within acceptable thresholds
Red Performance does not meet target and is outwith acceptable thresholds
Blue Performance surpasses the target and exceeds expectations
Page 149 of 196

Page 150

supply programme delivery in the current and future years. 
Next steps 
2.8 As noted in paragraph 1.5, the Strategic Performance Framework is supported by a
Performance Reporting Schedule.  This sets out the arrangements for service,
statutory, and Strategic Performance Framework reporting to committee.  In this
respect the relevant Committee can expect to receive the following in respect of New
Supply areas of work during 2023/24. 
Report Description Committee Committee
cycle
New supply
programme
annual update
on progress 
This report provides an update on
progress with the delivery of the new
supply programme which aims to deliver
5,000 new homes by 2035.  
Housing
Committee
Cycle 4 in
2023 
3. Measures of success 
3.1  Measures of success include:
• Regular oversight and monitoring of performance across the organisation to gain
assurances in terms of governance and accountability.
• Regular review and challenge processes to scrutinise the performance of the
council to ensure effective use of resources and that resources are directed in
accordance with agreed policy and according to priorities, while ensuring sound
decision making and clear accountability for the use of resources in achieving
improved outcomes for service users and the local community.  
• Performance monitoring, management, and reporting arrangements that support
the demonstration of improved performance in local services and outcomes, and
the delivery of Best Value. 
4. Supporting documentation 
4.1 Appendix 1 -  High-level performance overview 
Pamela Humphries
Chief Officer (Place) 
Page 150 of 196

Page 151

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 151 of 196

Page 152

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 152 of 196

Page 153

Appendix 1
Place - housing developments
High-level performance overview - as at September 2023 
Page 153 of 196

Page 154

Page 154 of 196

Page 155

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    SL/GT/AN Date 08/11/23 
Revenue Monitoring Report – Housing Revenue Account 
From  Andrew McPherson, Depute Chief Executive  
E-mail telferg@northla.gov.uk Telephone
Greg Telfer, Business
Finance Manager, 07586
010692 
1. Background 
1.1 The Council approved its Housing Revenue Account budget of £164m on 23 February
2023. 
1.2 The Financial Regulations require Services to remain within their approved budgetary
provision, and to report all significant deviations – defined as the higher of £100,000 or
5% - within their budget monitoring reports. Where significant deviations are identified,
Executive Summary
This report provides a summary of the Housing Revenue Account financial performance
for the period 1 April 2023 to 15 September 2023 (Period 6). The report illustrates the
projected outturn as at 31 March 2024, with major outturn variances highlighted and
explained in accordance with the Council’s approved Financial Regulations. 
The Service is currently projecting an overspend of £3.805m for the financial year which is
primarily due to anticipated increased loan charge costs, reflecting the impact of higher
interest rates.   
Approved savings of £0.070m have been included within the budget and are currently
anticipated to be fully delivered by the end of the financial year. 
Recommendations
It is recommended that the Housing Committee: 
1) Acknowledges the financial position of the HRA revenue budget 2023/24. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 15(a)
Page 155 of 196

Page 156

Services must provide explanatory commentary outline the action required to rectify
such a deviation, and where relevant, must also highlight the impact this has on other
budget headings. 
2. Report 
2.1 The service is currently projecting an overspend of £3.805m for the financial year. 
2.2 Analysis of Significant Variances 
2.2.1 The Housing Revenue Account currently anticipates an underspend of £2.000m within
Employee Costs which is a result of increased turnover/vacancy savings.  The position
also incorporates the impact of the current pay award offer being negotiated between
COSLA and the Trade Unions. Whilst negotiations remain ongoing, the financial impact
will continue to be monitored and reported as appropriate.   
2.2.2 An overspend of £2.875m is anticipated within Property Costs due to increasing costs
associated with repairs (£2.000m), void rent loss (£0.485m) and grounds maintenance
(£0.460m). With ongoing changes in the demand profile for housing repairs and
maintenance and uncertainties over costs with volatile inflation, there is an ongoing
financial risk relating to the outturn position for repairs and maintenance. The service
is aware of these risks and is continuing to monitor and manage the overspend without
impacting on key service delivery objectives. 
2.2.3 An underspend of £0.125m is projected within Administration Costs due to decreased
legal activity impacting legal fees (£0.100m) and sheriff officer fees (£0.025m). 
2.2.4 An underspend of £0.500m in Apportioned Expenses is projected as a result of lower
than anticipated IT recharges to the Housing Revenue Account. 
2.2.5 An overspend of £3.847m in Capital Financing Costs is projected as a result of
increased loans funds charges due to higher than anticipated borrowing rates affected
by the current market conditions.  It is currently expected that these additional costs will
be met from a draw down on reserve balances associated with the loan debt holiday.   
2.2.6 An under-recovery of £0.090m is projected within Fees and Charges due to reduced
court dues/fines (£0.050m), and the temporary removal of charges for laundry facilities
(£0.040m) as the service seeks to introduce new payment technology. 
2.2.7 An over recovery in Rents of £0.347m is anticipated due to increased mainstream rental
income. 
2.2.8 An over recovery of £0.035m in Interest is projected as a result of a higher than
expected return of interest on revenue balances associated with increased market
rates. 
2.3 Earmarked and One-off Resources 
2.3.1 HRA reserve balances brought forward from 2022/23 total £26.318m, this includes a
revised contingency fund balance of £1.640m and unallocated reserves of £5.312m.  It
is anticipated that a total of £9.386m will be utilised during 2023/24 including a draw
down of £3.847m to offset the increased costs of loan charges highlighted in paragraph
2.2.5 above.   Appendix 2 provides further detail of the reserve balances. 
Page 156 of 196

Page 157

2.4 2022/23 Budget Savings 
2.4.1 The service uses a variety of information, records and processes to monitor
achievement of its approved budget savings of £0.070m. As at Period 6, it is anticipated
that 100% approved savings will be delivered by the end of the financial year. 
3. Measures of success 
3.1 The Service continues to operate withing approved resources and meet required
savings targets.     
4. Supporting documentation 
4.1 Appendix 1  HRA Summary 
Appendix 2  Earmarked Reserves / Balance Sheet Provisions 
Andrew McPherson
Depute Chief Executive 
Page 157 of 196

Page 158

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The financial impacts are contained within the report and supporting appendices. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Page 158 of 196

Page 159

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All activities undertaken by the council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy, Services manage these as part of
their overall corporate and service planning process. The current economic climate,
in particular, has the potential to impact upon the Council’s ability to provide quality
services within approved budget levels. 
Reflecting the risk analysis matrix included within the Risk Management Strategy,
the Service considers the impact of inflation on key service contracts and the cost of
living crisis presents an ongoing risk to the financial outturn for 2023/24 and this is
an ongoing focus of discussion within the Service and with Finance. 
To minimise risk, this report has been prepared by Finance personnel in
consultation with budget managers, in accordance with the Financial Regulations. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these?
Page 159 of 196

Page 160

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 160 of 196

Page 161

Appendix 1 
FINANCIAL MONITORING REPORT
01 April 2023 to 15 SEPTEMBER 2023 (Period 6)
COMMITTEE:  HOUSING
CATEGORY ANNUAL PROJECTED ANALYSIS
BUDGET OUTTURN %
(1) (5) (6) (8) (10)
£ £
EMPLOYEE COSTS 31,762,510 29,762,510 2,000,000 FAV 6.3% Underspend due to increased turnover savings
PROPERTY COSTS 62,279,850 65,154,850 (2,875,000) ADV (4.6)% Overspend mainly due to increased repair costs, void rent loss
and ground maintenance costs
SUPPLIES & SERVICES 734,020 734,020 0 - 0.0% Balanced budget
TRANSPORT & PLANT 387,440 387,440 0 - 0.0% Balanced budget
ADMINISTRATION COSTS 5,585,040 5,460,040 125,000 FAV 2.2% Underspend due to decreased legal and sheriff officer fees
PAYMENTS TO OTHER BODIES 231,120 231,120 0 - 0.0% Balanced budget
APPORTIONED EXPENSES 7,764,850 7,264,850 500,000 FAV 6.4% Underspend due to decreased IT recharges
CAPITAL FINANCING COSTS 27,400,280 31,247,280 (3,847,000) ADV (14.0)% Overspend due to increased borrowing costs impacting loan
charges
C.F.C.R. 27,146,260 27,146,260 0 - 0.0% Balanced budget
OTHER COSTS 765,101 765,101 0 - 0.0% Balanced budget
TOTAL EXPENDITURE 164,056,471 168,153,471 (4,097,000) ADV (2.5)%
OTHER GRANTS 0 0 0 - 0.0% Balanced budget
FEES AND CHARGES 8,881,320 8,791,320 (90,000) ADV 1.0% Under recovery due to laundry charges and court dues / fines
RENTS 151,542,404 151,889,404 347,000 FAV 0.2% Over recovery of mainstream rental income
INTEREST 15,000 50,000 35,000 FAV 233.3% Over recovery due to interest received on revenue balances
DEPARTMENTAL CHARGES 538,607 538,607 0 - 0.0% Balanced budget
SURPLUS 3,079,140 3,079,140 0 - 0.0% Balanced budget
INCOME 164,056,471 164,348,471 292,000 FAV 0.2%
NET EXPENDITURE 0 3,805,000 (3,805,000) ADV
FAV = Favourable variation, underspend etc 362,119            
ADV = Adverse variation, overspend, income under-recovery etc
PROJECTED OUTTURN
VARIANCE
(7)
Page 161 of 196

Page 162

Appendix 2 
DESCRIPTION OF EARMARKED
RESERVES
VALUE OF
EARMARKED
RESERVE
CARRY FORWARD ANALYSIS
VALUE %
(1) (2) (3) (4) (5) (6)
£ £ £
Ambition 4,385,433 3,088,000 29.6% 1,297,433 To fund 2023/24 HRA and residual balance required in
future years
UCAF 350,208 350,208 0.0% 0 Budget fully utilised
Rent Assistance Fund 1,003,563 1,003,563 0.0% 0 Budget fully utilised
Enterprise Contract 1,000,000 1,000,000 0.0% 0 Budget fully utilised
Rent Restructure 334,586 97,028 71.0% 237,558 Balance required in future years
Loan Debt Holiday 9,792,625 3,847,000 60.7% 5,945,625 To manage loan charge position and residual balance
required in future years
HRA Capital Programme 2,500,000 0 100.0% 2,500,000 Balance required in future years
SUB TOTAL 19,366,415 9,385,799 51.5% 9,980,616
Change Management/Risks & Uncertainty 5,311,595 0 0.0% 5,311,595 Mainly required to fund future years
Core Reserve 1,640,000 0 100.0% 1,640,000 No call anticipated in 2022/23
TOTAL 26,318,010 9,385,799 64.3% 16,932,211
PROJECTED OUTTURN
North Lanarkshire Council
Housing Revenue Account - Earmarked Reserves
01 April 2023 to 15 SEPTEMBER 2023 (Period 6)
Page 162 of 196

Page 163

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/JMcG Date 08/11/23 
Enterprise and Communities – Revenue Monitoring Report 
From  Andrew McPherson, Depute Chief Executive  
E-mail telferg@northlan.gov.uk Telephone
Greg Telfer, Business
Finance Manager, 07583
010692 
Executive Summary
This report provides a summary of the financial performance of the Enterprise and
Communities service for the period 1 April 2023 to 15 September 2023 (Period 6), with
major outturn variances highlighted and explained as per the Council’s approved Financial
Regulations. 
In summary, the Enterprise and Communities service is currently forecasting a year end 
underspend of £1.023m. This underspend is mainly attributable to employee vacancy
savings across the Service.  The Service continues to review inflationary pressures and
also work with Business and Digital to progress plans for delivery of digital savings which
are temporarily offset this financial year through grant which has been received in advance
of need and an earmarked reserve. 
Recommendations 
It is recommended that Committee: 
(1) Acknowledges the financial position of the 2023/24 Enterprise and Communities
revenue budget.  
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 15(b)
Page 163 of 196

Page 164

1. Background 
1.1 The Council’s approved Financial Regulations require services to remain within their
approved budgetary provision, and to report all significant deviations – defined as the
higher of £100,000 or 5% - within their budget monitoring reports. Where significant
deviations are identified, services must provide explanatory commentary, outline the
action required to rectify such deviations and where relevant, must also highlight the
impact this has on other budget headings. 
1.2 The most significant financial risk facing Enterprise and Communities during 2023/24
is the delivery of the Digital NL savings.  Inflationary pressures are also being closely
monitored.  The Service will continue the curtailment of non-essential expenditure to
manage the overall budget position.   
2. Report 
Summary of Financial Position 
2.1 The Council approved its General Fund Revenue Budget on 23 February 2023, of
which £153.119m (15.65%) represented the approved Net Revenue Budget for
Enterprise and Communities.  There has been an in year transfer to the Chief
Executive’s service of £0.238m in relation to the Customer Contact Centre.  Therefore
the revised budget for the service totals £152.882m. 
2.1.1 Enterprise and Communities is currently forecasting an underspend of £1.023m mainly
linked to vacancy savings which the Service is actively seeking to recruit. 
2.1.2 In addition, the Service faces a cost pressure attributable to the delay in implementation
of savings linked to the DigitalNL programme (£1.960m). The service continues to work
with Business and Digital to progress plans for the delivery of these savings.  This
burden is offset this financial year by utilising grant received in advance of need and
also an earmarked reserve. 
2.1.3 Section 2.2 provides commentary on the financial performance of the Service per
division.  In addition, Appendices 1 to 6 of this report provide further explanation of the
significant budget variations contributing to this outturn position. 
2.1.4 The 2023/24 Enterprise and Communities budget incorporated £4.969m of savings with
£2.500m of savings (50.31%) forecast to be delivered within the current financial year.
Further information regarding particularly challenging savings is noted in paragraph 2.4
below. 
Analysis of Significant Variations 
2.2 The Enterprise and Communities service is currently forecasting an underspend of
£1.023m. As at Period 6, the main variances across the divisions are further explained
as follows:   
2.2.1 Assets and Procurement (£0.281m underspend)
Assets and Procurement is currently forecasting an underspend of £0.281m which
largely relates to employee savings across the division (£0.739m) partially offset by
increased use of external advisors to support the delivery of projects as a result of key
staff vacancies (£0.308m) and timing of the office rationalisation saving (£0.174m). 
Page 164 of 196

Page 165

The service anticipates an under-recovery in paid school meal income (£0.195m) which
is fully offset by reduced food costs and net employee cost savings across the division.
At this stage in the financial year forward projections are based on the assumption that
uptake for free school meals is in line with that experienced during 2022/23. This will
continue to be monitored throughout the remainder of the school year. Inflation within
food costs is also being monitored closely. 
2.2.2 Community Operations (£0.202m underspend)
Community Operations is projecting net employee savings of £0.705m, largely due to
vacancies within Land Management (£0.478m) and Fleet (£0.308m). In Waste,
underspends of £0.533m are expected within tipping fees as a result of a new contract
for Paper and Card waste collection, as well as more favourable pricing across various
tonnage streams and reduced volume of waste in some areas. Delays in recruitment
have led the service to source agency staff which is resulting in a projected overspend
of £0.187m in Administration Costs. The service anticipates an over-recovery of income
from the Active Schools programme at Strathclyde Park (£0.172m), which is fully offset
by the forecast under-recovery of special uplift income in Waste (£0.172m). 
2.2.3 Within Fleet an underspend of £0.308m is forecast within Employee Costs mainly due
to difficulties in recruiting mechanic posts. These savings are reduced by increased
driver costs providing the school transport service within Education.  As a result of the
shortage of mechanics the service anticipated additional costs of £0.852m with the
inspection and repairs on larger vehicles are currently being completed by external
partners resulting and the requirement to hire additional vehicles while there are delays
in completing repairs.  The Services continues to seek to recruit these key positions.  
2.2.4 Place (£0.524m underspend)
The Place division is currently forecasting net employee savings of £0.612m.  Given
the number of staff vacancies the service has utilised external advisors to support the
delivery of projects (£0.253m). The service is also benefiting from additional one-off
grant funding supporting core activity (£0.100m) which contributes to the overall
projected underspend position.   
2.2.5 Included within the reported outturn is the Council’s trading services. For 2023/24 the
Council approved a surplus budget of £0.551m. The Council must comply with a
statutory requirement to at least break-even over a rolling three year period. The
combined surplus, excluding non-cash technical accounting adjustments,  in 2020/21,
2021/22 and 2022/23 was £0.554m. As at Period 6 the Trading Accounts is forecasting
a reduced surplus of £0.210m which attributable to lower than anticipated income for
the trade waste function, the Service is currently reviewing this Service and the costs
associated with it. 
2.2.6 Payments to other bodies are detailed in Appendix 3. This expenditure category
accounts for £20.863m with a projected minor variance in 2023/24. 
Earmarked and One-off Reserves 
2.3 Enterprise and Communities was given approval to earmark £16.187m of resources
during the completion of the 2022/23 annual accounts. At Period 6, £12.017m of the
reserve balance is anticipated to be utilised in 2023/24. A balance of £4.160m is
required for the original purpose in future years. The remaining balance of £0.010m is
no longer required. Appendix 4 details the individual Earmarked Reserves. 
2023/24 Budget Savings and Growth 
Page 165 of 196

Page 166

2.4 The Service uses a variety of information, records and processes to monitor
achievement of its approved budget savings of £4.969m. As at Period 6, £2.500m
(50.31%) of its approved savings are forecast to be achievable during the year. The
gap of £2.469m represents digital savings (£1.910m), which have been offset this
financial year by grant income received in advance of need and an earmarked reserve. 
There is also a timing delay in office rationalisation (£0.415m) which has been offset
this year by an earmarked reserve.  The other staffing related saving (£0.117m) are
offset by in year vacancy savings. 
2.5 As part of the Council’s investment budgets for 2023/24, Enterprise and Communities
was allocated £1.081m towards both Community Operations and Anti-Social
Behaviour.   Appendix 6 highlights there is an underspend forecast this financial year
(£0.286m) due to timing delays in recruiting the permanent posts within Land
Management, Fleet and Environmental Facilities. The funding will be carried forward
into 2024/25.     
Management Actions 
2.6 The Service continues to take a range of corrective management actions to ensure it
manages cost pressures. This includes curtailment of non-essential spend and
monitoring of vacancies. 
Change Management 
2.7 The Service is forecast to utilise £0.180m of the Council’s Change Management Fund
mainly to support reinstatement at Palacerigg Country Park, the litter bin strategy and
voluntary severance costs.  Costs within the Change Management Fund are not
included in the Service outturn position.2.1 
3. Measures of success 
3.1 The Service continues to operate within the approved budget resources 
4. Supporting documentation 
Appendix 1  Objective Analysis 
Appendix 2  Subjective Analysis 
Appendix 3  Payments to Other Bodies Analysis 
Appendix 4  Status of Earmarked Reserves 
Appendix 5  Challenging Savings 
Appendix 6  One-Off Investments 
Andrew McPherson
Depute Chief Executive 
Page 166 of 196

Page 167

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The Service continues to curtail non-essential expenditure and take management
action to minimise the impact of cos pressures on the Council’s overall financial
position.   
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐   
Page 167 of 196

Page 168

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All activities undertaken by the Council are subject to risk, and in acknowledging
the Council’s approved Risk Management Strategy, Services managed these as
part of their overall corporate and service planning processes. The current
economic climate, in particular, has the potential to impact upon the Council’s
ability to provide quality services within the approved budget levels. 
To reduce other financial risks, this report was prepared by service based Finance
personnel in consultation with budget managers, in accordance with the 
Financial Regulations. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 168 of 196

Page 169

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 169 of 196

Page 170

APPENDIX 1
DIVISION OF SERVICE ANNUAL
BUDGET
PROJECTED
OUT-TURN
PROJECTED
OUT-TURN
VARIANCE
%
PERIOD
MOVEMENT
SINCE
ANALYSIS
P4
[1] [2] [3] [4] [5] [6] [7]
£ £ £ £
Assets & Procurement 41,694,381 41,413,625 280,756 FAV 0.7% (47,919) Employee vacancies savings across the service partially
offset by consultancy costs, property costs and reduced
paid school meal income.
Community Operations 88,819,673 88,617,241 202,432 FAV 0.2% 91,889 Employee vacancy savings across the service offset by
overtime costs and turnover. Tonnage costs less than
anticipated within Waste. Increased agency costs in
Waste as well as increased Hires and Outsourcing costs
within Fleet. Under-recoveries of Special Uplift income in
Waste offset by over-recoveries of Active Schools
income at Strathclyde Park.
Housing Operations 5,652,817 5,425,212 227,605 FAV 4.0% 227,605 Minor Variance
Housing Property Services 8,585,905 8,587,518 (1,613) ADV (0.0%) (1,613) Balanced Budget
Place 8,591,146 8,066,740 524,406 FAV 6.1% 100,081 Vacancy savings partially offset by additional external
advisor costs.
Trading (462,202) (252,111) (210,091) ADV 45.5% (201,769) Underrecovery in Trade Waste income
NET EXPENDITURE 152,881,720 151,858,225 1,023,495 FAV 0.7% 168,274
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Objective Analysis
Period 06 (01 April 2023 - 15 September 2023)
Enterprise & Communities
Page 170 of 196

Page 171

APPENDIX 3
[1] [2] [3] [5] [7]
£ £ £
APS ROADS MAINTENANCE 12,352,284 12,352,284 0 0.0%
BUSINESS SUPPORT GRANTS 3,873,901 3,873,901 0 0.0%
HOMELESS SUPPORT FEES 1,380,920 1,380,920 0 0.0%
PAYMENTS TO OTHER BODIES -
GENERAL
1,379,178 1,376,986 2,193 FAV 0.2% Minor Variance
PAYMENTS TO CONTRACTORS -
ROADS MAINT
857,221 829,841 27,380 FAV 3.2% Minor Variance
SUB-CONTRACTOR PAYMENTS 296,000 298,630 (2,630) ADV (0.9%) Minor Variance
AGENCY FEES 280,904 280,904 0 0.0%
PUBLIC ANALYST FEES 267,000 279,286 (12,286) ADV (4.6%) Minor Variance
PRIVATE SECTOR HOUSING GRANTS 176,000 176,000 0 0.0%
TOTAL EXPENDITURE 20,863,408 20,848,752 14,657 FAV 0.1%
ANALYSIS
[4]
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Payments to Other Bodies
Period 06 (01 April 2023 - 15 September 2023)
Enterprise & Communities
CATEGORY ANNUAL
BUDGET
PROJECTED
OUT-TURN
PROJECTED OUT-TURN
VARIANCE %
Page 171 of 196

Page 172

APPENDIX 4
Period 06 (01 April 2023 - 15 September 2023)
Value %
£000 £000 £000 £000 £000 £000 £000 £000
Service Specific Earmarked Reserves:
Dilapidations 400 124 524 18 400 76.3% 0 0 400 Costs associated with leased in property disinvestment
Office Rationalisation 500 0 500 500 500 100.0% 0 0 500 Costs associated with Office closures and new energy
mgt system
Enterprise Contract 1,224 0 1,224 425 1,224 100.0% 0 0 1,224 Ongoing set up cost for the Enterprise Contract
Local Heat and Energy Efficiency Funding 75 0 75 0 75 100.0% 0 0 75 Consultancy spend for LHEES program
Winter Reserve 1,500 0 1,500 0 1,500 100.0% 0 0 1,500 Contingency for significant winter event
Open Space Strategy (temp Posts - Park Rangers) 113 0 113 52 113 100.0% 0 0 113 Temporary Staffing
Housing Grants to owner occupiers 176 0 176 5 176 100.0% 0 0 176 Funding for Private Sector Grants
Fleet - Grant for Lease Vehcles 118 0 118 54 118 100.0% 0 0 118 Grant funding for electric vehicles
Bellshill Depot Eco hub 200 0 200 0 200 100.0% 0 0 200 Set up costs for Eco Hub
Service Developments (fleet pressures inc hires) 739 0 739 738 739 100.0% 0 0 739 Contingency for increased fleet pressures
Service Developments - Ash Dieback 300 700 1,000 41 41 4.1% 259 0 41 Works associated with removing ashdieback
Protective Services Environmental Improvements 665 111 776 133 665 85.7% 0 0 665 Environemtal Improvements
Park Rangers 35 0 35 0 25 71.4% 0 10 25 Staffing costs
Cemeteries increased demand Bothies 318 0 318 27 68 21.4% 250 0 68 Funding for works in cemetery bothies; extra cleaning/
waste and plant hire due to covid.
Digital NL 1,960 0 1,960 735 735 37.5% 1,225 0 735 Digital Savings less income uplift and grant income
received in advance of need
HEEPS 0 591 591 0 0 0.0% 0 0 0 Energy Efficiency Schemes - contributions to current
programme
Rapid Rehousing 1,081 0 1,081 262 1,081 100.0% 0 0 1,081 Rapid Rehousing programme to tackle homelessness
Homelessness Surplus 0 283 283 0 0 0.0% 0 0 0 Homelessness surplus 22/23
Renewables 200 0 200 0 200 100.0% 0 0 200 Maintenance of renewable heating systems
Electrical Testing 600 0 600 314 600 100.0% 0 0 600 Electrical testing programme
City Deal - Delburn Street / Manse Road 59 0 59 0 59 100.0% 0 0 59 Temporary Property costs as a result of capital
programme
Business Recovery 3,172 480 3,652 64 3,172 86.9% 0 0 3,172 Costs to support business recovery
LUF Ravenscraig 26 0 26 0 26 100.0% 0 0 26 Costs assocaited with LUF bid
Smith Stone - Roadworks (former capital receipt) 150 0 150 150 150 100.0% 0 0 150 Roads works linked to former capital receipts
Local Deelopment Plan 150 137 287 0 150 52.3% 0 0 150 Set up cost to produce LDP
Total 13,761 2,426 16,187 3,519 12,017 1935.6% 1,734 10 12,017
Reserves
Required In
Year
Commentary Regards UsageDESCRIPTION OF EARMARKED RESOURCE Reserve Allocation
2023/24
Profiled in
Future Years
Approved
Reserve Total Spend to Date Projected Spend Reprofile to
Future Years
No Longer
Required
FINANCIAL YEAR - 2023/24
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Status of Earmarked Reserves
Enterprise  & Communities
Page 172 of 196

Page 173

APPENDIX 5
Period 06 (01 April 2023 - 15 September 2023)
£000 £000 £000 £000 £000
Savings 2021/2022 and 2022/23
EC10 Asset Management
Rationalisation/Office Dis-
investment.
Assets &
Procurement
Solutions
800 385 415 Timing of Office Closures Ear Marked Reserve 415 0
EC37 Review of staffing within Business
Intelligence and Strategic Resourcing
Housing Mgt 76 0 76 Delays in staff changes Vacancy savings within Service 76 0
CE05 Digital Savings Service Wide 1,960 50 1,910 Service working with Digital Team to
identify oppotunities for savings
Funding in advance of need / Ear
Marked Reserve
1,910 0
Base Budget Savings 23/24 0 0
ECBB03 Income Generation Countryside
Rangers
Community
Operations
22 0 22 Difficulties within NHS funding has
forced a review of the provision of this
service to them at present, and
charging status.
Other income over recoveries in this
Service
22 0
ECBB04 Greenspace Income Community
Operations
31 26 5 Small shortfall in income generation Other income over recoveries in this
Service
5 0
ECBB19 Protective Community
Operations
41 0 41 Timing Delays for VRS Vacancy savings within Service 41 0
TOTAL 2,930 461 2,469 2,469 0
Reasons for Savings Gap
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Challeging Savings
Enterprise & Communities
DESCRIPTION Value Revised
Savings Gap CommentarySavings Gap
APPROVED SAVINGS REPLACEMENT SAVING / FUNDING
Ref. DESCRIPTION OF APPROVED
SAVING DIVISION Target Value Value
Deliverable
Page 173 of 196

Page 174

Budget 2022/23 Enterprise & Communities Appendix 6
Investments Priorities
£000 £000 £000
Division Council Motion Narrative 2023/24
Allocation
Projected
Outturn
Outturn
Variance
Approved in Feb 2023
Anti Social Behaviour Staffing 111 111 0
Community operationsSeasonal Staff to Permanent/ Additional Mechanic/
Environmetnal Protection Officers
970 684 286
1081 795 286
Page 174 of 196

Page 175

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    LC/VR/GT Date 08/11/23 
HRA Capital Monitoring Report – 1 April 2023 to 15 September
2023 
From  Andrew McPherson, Depute Chief Executive  
E-mail Telferg@northlan.gov.uk Telephone
Greg Telfer, Business
Finance Manager, 01698
302836 
Executive Summary
The purpose of this report is to review progress towards agreed spending plans within the
2023/24 HRA capital programmes. At this stage in the year the Mainstream programme is
projected to fully spend.
The New Build programme is projected to overspend by £2.253m, this is due to an
acceleration in the programme for the site at Lorne Place, Coatbridge. Phase 1 is
scheduled to complete in November 2023. This was originally due to complete in 2024/25.
The Buy Back Programme is projected to overspend by £3.458m, this is mainly due to the
average price of properties purchased and repairs being higher than anticipated, and a
revised acquisition target from 100 to 120 properties. 
Recommendations
It is recommended that the Housing Committee: 
(1) Acknowledges the financial position of the 2023/24 HRA Capital Programmes.   
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning 
Programme of Work  Transforming Places
Item 16(a)
Page 175 of 196

Page 176

1. Background 
1.1. Mainstream Working Programme 
1.1.1 The Housing and Regeneration Committee on 10 May 2023 approved an outline
mainstream programme for 2022/23 based on targeted expenditure of £60.882m. The
overall programme is funded as follows:  
£000
Prudential Borrowing  32,871
Capital Funded from Current Revenue (CFCR)  22,476  
Total projected resources  55,347
Slippage allowance    5,535
Working Programme   60,882 
1.2. New Build Programme 
1.2.1 The 2023/24 working programme for new build is £59.995m, with 348 completions
expected for the year and is funded as follows: 
£000
Prudential Borrowing 40,236
Capital Funded from Current Revenue (CFCR)   4,670
Scottish Government Grant 15,089
Total projected resources 59,995 
1.3 Council Buy Back Schemes 
1.3.1 As part of the 2023/24 Revenue Estimates, the budget provided for the continuation of
both the Council’s Empty Homes Purchase Scheme (EHPS) and the Open Market
Purchase Scheme (OMPS). This will allow approximately 100 properties to be brought
back into Council use.   
1.3.2 In addition to the EHPS and OMPS, the Mortgage to Rent scheme (MTR) was also
added to the overall Council Buy Back scheme and is anticipating an additional 5
properties to be brought back into council use in 2023/24. 
1.3.3 Funding requirements for 2023/24 for the Council Buy Back Scheme is made up as
follows: 
£000
Prudential Borrowing 5,754
Scottish Government Grant
Subsidy Income
4,000    
296
Total projected resources 10,050 
Page 176 of 196

Page 177

2. Report 
2.1 Mainstream 
2.1.1 A summary of the mainstream working programme and actual spend to 15 September
2023 (Period 6) is included within Appendix 1, highlighting that at this stage in the
financial year: 
• £55.232m (91% of the working programme) has been legally committed; and
• £23.592m (43% of the projected resources) has been spent. 
2.1.2 Legal commitments are higher than historic trends (100% - 78%) and spend to date is
slightly higher than previous years (43% - 34%). The programme is projected to fully
spend. 
2.2 New Build
2.2.1 A summary of projected outturn spend on the new build programme is contained within
Appendix 2. Projected spend totals £62.248m, an overspend of £2.253m, and is funded
by Prudential Borrowing, CFCR and Scottish Government Funding. 
2.2.2 There are currently fourteen projects on site at Dykehead Road, Airdrie; Northburn
Place, Airdrie; Former Orrs Building, Airdrie (off-the-shelf purchase); Castlehill Road,
Wishaw; Berwick Street, Coatbridge; Ravenscliff Road, Ravenscraig; Glenacre Drive,
Airdrie; Petersburn Road, Airdrie; Brandon Street, Motherwell; Auchengeich, Gartferry
Road, Moodiesburn (off-the-shelf purchase); Lorne Place, Coatbridge (off-the-shelf
purchase); Dowanfield Road, Cumbernauld (off-the-shelf purchase); Johnston Road,
Gartcosh (Phase 2) (off-the-shelf purchase); and Springhill Road, Shotts (off-the-shelf
purchase).
2.2.3 Handover of the next 16 homes at Dykehead Road, Airdrie, took place on 7th
September 2023, with 78 of the 150 homes now complete.
2.2.4 Following a revision of Scottish Water’s surface water policy, the council is continuing
to progress financially viable solutions for connection issues that will allow a contract
award to be made at Laburnum Road, Viewpark.
2.2.5 To date, 1,138 new build homes have been completed as part of the Council’s
ambitious new supply programme of 5,000 new homes. Currently, 451 homes are
under construction, with a total of 377 homes expected to complete during 2023/24.
2.2.6 Sites have been identified and approved at Committee for a further 1,289 homes across
35 sites, with site investigations, title checks and design development on these sites
progressing.
2.2.7 The Council has appointed contractors who are progressing layouts and designs for
several sites, with site investigations underway.
2.3 Council Buy Back Scheme
2.3.1 A summary of projected outturn spend on the Council Buy Back Schemes is also
contained within Appendix 2.  Projected spend currently totals £14.603m collectively
between the Council buy back schemes, £13.984m attributable to EHPS and OMPS
and £0.619m to the MTR scheme. This is funded by Prudential Borrowing, Scottish
Government Funding and Subsidy Income.
Page 177 of 196

Page 178

2.3.2 To date, 62 properties have been brought back into use as affordable housing in
2023/24, with 120 properties expected to be acquired during this financial year. A
Scottish Government grant contribution of £1.975m has been secured for 2023/24, with
further funding to be made available depending on progress.
2.3.3 The final cost of borrowing will equate to a potential drawdown of £0.574m in 2023/24
from the amounts set aside for “Our Ambition”.   
3. Measures of success 
3.1  The successful delivery of the HRA capital programmes, providing high quality housing
stock.   
4. Supporting documentation 
4.1 Appendix 1 – 2023/24 HRA Capital Programme – Mainstream Budget Monitoring
Period 6 
Appendix 2 – 2023/24 HRA Capital Programme – New Build / Council Buy Back
Scheme Budget Monitoring Period 6 
Andrew McPherson
Depute Chief Executive 
Page 178 of 196

Page 179

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Financial impacts are outlined throughout the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? Page 179 of 196

Page 180

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All activities undertaken by the Council are subject to risk, and in acknowledging
the Council’s approved Risk Management Strategy, Services managed these as
part of their overall corporate and service planning processes. The current
economic climate, in particular, has the potential to impact upon the Council’s
ability to provide quality services within the approved budget levels.
To reduce other financial risks, this report was prepared by service based Finance
personnel in consultation with budget managers, in accordance with the Financial
Regulations
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ Page 180 of 196

Page 181

Appendix 1 
Page 181 of 196

Page 182

Appendix 2 
Page 182 of 196

Page 183

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/JM Date 08/11/23 
Enterprise & Communities – Capital Monitoring Report 
From  Andrew McPherson, Depute Chief Executive  
E-mail telferg@northlan.gov.uk Telephone
Greg Telfer, Business
Finance Manager, 07583
010692 
1. Background 
1.1 Financial year 2023/24 is the third year of the 5 year capital programme which was
initially approved by the Policy and Strategy Committee on 18 March 2021.   
1.2 The Enterprise and Communities 2023/24 capital programme of £190.796m was
approved by the Policy and Strategy Committee on 16 March 2023. The programme
has since been increased by £22.403m relating to carry forwards from 2022/23 and
Executive Summary 
This report highlights the financial performance of 2023/24 Enterprise and Communities
capital programme for the period ended 15 September 2023 (Period 6). 
In summary the Service has a total capital budget of £154.265m.  At this stage in the
financial year the service expects expenditure to be £13.631m lower than current
programme. 
Further explanation of project variances and management action taken by the Service is
included within the main report and attached appendices. 
Recommendations
It is recommended that the Committee: 
(1) Acknowledges the financial position of the 2023/24 Enterprise and Communities
capital programme.  
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 16(b)
Page 183 of 196

Page 184

reduced external funding £4.084m. Reprofiling of £55.049m to future years was
approved at the Housing Committee on 30 August 2023.  A further transfer between
services of £0.200m was actioned.  This results in a revised working capital budget of
£154.265m. 
1.3 The Council’s approved Financial Regulations required services to remain within their
approved budgetary provision, and to report all significant deviations – defined as the
higher of £0.100m or 5% - within their budget monitoring reports.  Where significant
deviations were identified, services must provide explanatory commentary, outline the
action required to rectify such deviations and where relevant, must also highlight the
impact this has on other budget headings. 
2. Report 
2.1 At Period 6 the service is projecting that expenditure will be £13.631m less than budget
for the current financial year.  Capital budgets and expenditure are summarised into
Project/Themes (see Appendix A). 
2.2 Assets & Procurement (£8.046m less than budget) 
Within the Town and Community Hub theme there is a variance of £4.347m mainly in
relation to St Kevin’s Community Hub where the Council is currently in Stage 2 of
development and in the final stages of market testing.  Additional site monitoring is
required in support of the planning application.   
The Outdoor Education theme is forecasting a variance of £2.938m.  The Service is
concluding site investigation and feasibility work in relation to four pitch projects that
were funded from Council Growth funds.  These projects will span into next financial
year when the majority of the spend will take place at the construction phase. 
The ASN Rationalisation theme is forecasting a variance of £2.802m.  The Service is
currently issuing tender documents for interest in the Edward Lawson Centre project to
determine if this project is within the current budget allocation and as a result this project
is now likely to span into the new financial year.  The 1140 Early Learning theme is also
forecasting a variance of £0.434m as the Service is experiencing difficulties with the
current contractor and actively seeking a new solution to deliver the Heathery Park
project. 
Within the Office Rationalisation theme there is a timing delay resulting in a forecast
variance of £2.223m.  Works to the Civic are under review due to increased contractor
costs. Various projects continue to be considered and progress continues to be made
on the closure of Fleming House where negotiations are well underway on the
relocation of antenna to allow the demolition to then be scheduled. 
These variances have been partially offset by additional expenditure and acceleration
throughout the remainder of the programme. Within the Maintaining Existing Assets
theme additional expenditure of £3.296m is forecast.  This is largely attributable to re-
roofing projects (£2.583m) where there have been additional costs for asbestos
removal and acceleration of works on other sites.  In addition, the service has sought
to accelerate works on school re-roofing projects to minimise disruption within the
school term time. 
There is also additional in-year expenditure of £1.182m forecast within the Carbon
Management theme.  As part of the Council’s commitment to achieve net zero
Page 184 of 196

Page 185

emissions capital funds are allocated for delivery of projects through the Non Domestic
Energy Efficiency framework (NDEE).  The NDEE project includes a wide range of
energy measures that will contribute to the mitigation of ongoing financial burdens, both
revenue and capital and reductions in the Council’s carbon footprint. The measures
include upgrades that will add to the comfort of the buildings via improved lighting and
centralised heating controls bringing an added value to the occupants such as school
children. The NDEE framework benefits from external support which assists with the
pace of delivery and eases pressure on Council resource. It is also a key lever in the
Council Climate Plan.   Therefore, it has been deemed necessary to accelerate future
budget allocations. 
The Leisure Development theme is forecasting accelerated expenditure of £0.247m in
total across a number of upgrades. 
The demolition theme is forecasting additional in-year expenditure of £0.135m as funds
have been accelerated in order to dispose of surplus properties as efficiently as
possible.   
2.3 Community Operations (£5.738m less than budget) 
The Cemeteries Theme is forecasting a variance of £4.163m which is largely
attributable to the replacement cemetery at Pather where the Service is awaiting a
tender return to determine if the project is still within the current budget allocation and
confirm the timeline for the project.  It is anticipated expenditure will fall largely into the
new financial year. 
The Parks Master Plan theme is also reporting a variance of £1.541m as a result of
delays in the announcement from the Scottish Government for the Green Growth
Accelerator project.  Given this delay it is anticipated that the contingency element of
the project will not be required until the new financial year. 
2.4 Place (£0.153m more than budget) 
Within City Deal, an in-year variance of £0.153m is projected reflecting current contract
progress expectations. 
3. Measures of success 
3.1  The Service aim is to be in a balanced budget position at financial year-end and will
take current reprofile requests to Committee.     
4. Supporting documentation 
4.1 Appendix 1 Summary Expenditure by Project/Theme 
Andrew McPherson
Depute Chief Executive 
Page 185 of 196

Page 186

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Service aims to operate within approved funding levels and utilise budget
virements to support emerging issues and mitigate variances across budget heads. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐   
Page 186 of 196

Page 187

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All activities undertaken by the Council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy, Services managed these as part of
their overall corporate and service planning processes.  The current economic
climate, in particular, has the potential to impact upon the Council’s ability to provide
quality services within approved budget levels. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC).
Page 187 of 196

Page 188

If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 188 of 196

Page 189

Appendix 1
Enterprise & Communities Capital Programme 2023/24
Theme Expenditure Summary
1st April 2023 - 15th September 2023 (PERIOD 6)
Thematic Category
Revised
Budget
£
Actual
£
Committed
£
Uncommitted
£
Projected
Outturn
£
Outturn
variance
£
ASSET & PROCUREMENT SOLUTIONS
Maintaining Existing Assets - windows, re-roofing, re-wiring
and condition survey works for the Council's building assets 9,510,204 6,302,240 11,198,523 1,607,404       12,805,927 (3,295,723)
Carbon Management 2,326,512 83,364 3,283,365 224,824          3,508,189 (1,181,677)
Office Rationalisation 2,967,842 157,281 480,286 264,672          744,958 2,222,884
Shared Campus 0 0 0 -                  0 0
Leisure Development 647,669 672,589 695,595 200,066          895,661 (247,992)
Health & Wellbeing & Digital Classrooms 225,000 252,907 252,830 -                  252,830 (27,830)
Rationalisation including ASN & Social Work 4,534,425 259,571 364,667 1,367,624       1,732,291 2,802,134
Curriculum Development 695,311 384,987 384,987 99,129            484,116 211,196
Sustainable Estate 2,548,759 698,575 1,872,322 418,402          2,290,724 258,035
Outdoor Education and Outdoor Spaces 3,568,666 470,927 501,380 128,434          629,814 2,938,852
Future Capital Receipts Investments 869,749 113,323 678,999 190,750          869,749 0
Design Fees 1,417,101 801,953 1,696,045 -                  1,696,045 (278,944)
1140 Early Learning and Childcare Expansion 953,737 71,397 71,397 448,807          520,204 433,533
Demolitions 460,159 356,287 595,693 -                  595,693 (135,534)
TOTAL ASSET & PROCUREMENT SOLUTIONS 30,725,134 10,625,400 22,076,090 4,950,111       27,026,201 3,698,934
TOWN AND COMMUNITY HUBS
Town and Community Hubs 28,948,123 11,361,850 17,010,861 7,590,569       24,601,431 4,346,692
TOTAL TOWN AND COMMUNITY HUBS 28,948,123 11,361,850 17,010,861 7,590,569       24,601,431 4,346,692
COMMUNITY OPERATIONS
Contaminated Land and Pollution Control 296,170 80,677 80,677 215,493          296,170 0
Vehicle Replacement Programme 4,020,068 1,178,171 1,674,671 2,345,397       4,020,068 0
Depot Rationalisation and Investment 5,900,935 2,082,362 3,707,958 2,192,977       5,900,935 0
HWRC Equipment 269,923 88,065 128,571 141,352          269,923 0
Cemeteries/Tree Infrastructure 5,041,200 614,792 727,866 150,443          878,309 4,162,891
Road Asset Management including street lighting, road
improvements and gateway signage 12,993,813 4,119,595 9,771,511 3,222,302       12,993,813 0
Greenspace Infrastructure Health & Wellbeing 1,520,527 339,390 753,227 734,189          1,487,415 33,112
Play Area Equipment and surface renewal 240,485 52,358 52,358 188,127          240,485 0
Bin rationalisation project and replacement 126,955 0 0 126,955          126,955 0
Replacement of Plant & Machinery 735,531 227,670 467,352 267,264          734,616 915
Parks Masterplans 3,310,879 507,244 855,065 914,613          1,769,678 1,541,201
TOTAL COMMUNITY OPERATIONS 34,456,486 9,290,322 18,219,255 10,499,113     28,718,368 5,738,119
PLACE
Economic Regeneration 26,835,941 11,544,873 16,529,889 10,306,053     26,835,942 (1)
City Deal 19,942,442 8,833,047 13,068,153 7,000,698       20,068,851 (126,409)
Enterprise Projects 1,560,524 585,977 661,086 926,013          1,587,099 (26,575)
Infrastructure & Transportation Improvements 11,719,350 3,946,640 9,183,689 2,535,661       11,719,350 0
Antonine Wall Project 30,103 0 0 30,103            30,103 0
TOTAL PLANNING & REGENERATION 60,088,360 24,910,537 39,442,817 20,798,528     60,241,345 (152,985)
HOUSING PROPERTY & PROJECTS
Water Quailty / Ventilation 47,187 22,076 22,076 25,111            47,187 0
TOTAL HOUSING PROPERTY & PROJECTS 47,187 22,076 22,076 25,111            47,187 0
TOTAL ENTERPRISE & COMMUNITIES 154,265,290 56,210,185 96,771,100 43,863,432     140,634,532 13,630,760
YTD OUTTURN
Page 189 of 196

Page 190

Page 190 of 196

Page 191

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    BL/SS Date 08/11/23 
Housing and Corporate Repairs and Maintenance Contract and
Gas Central Heating Repairs and Maintenance Contracts – Short
Term Extension 
From  Chief Officer of Housing Property Services  
E-mail laffertyb@northlan.gov.uk  Telephone Siobhan Starbuck,
Contract Support Manager –
07583 062739 
Executive Summary 
Committee is asked to acknowledge the application of a short term extension for the
continued delivery of the Housing and Corporate Repairs and Maintenance services (the
‘Contract’) to Mears Scotland LLP. 
The extension covers the existing agreement which will commence on expiry of the existing
contract (21st January 2024) for up to 6 months. 
The value of this Contract extension is estimated at Twenty-seven million five hundred
thousand pounds sterling (£27,500,000) exclusive of VAT. 
Committee is also asked to acknowledge the application a short term extension for the
continued delivery of the Gas Central Heating Repairs and Maintenance services (the
‘Contract’) to Saltire Facilities Management Limited. 
The extension covers the existing agreement and will commence on expiry of the existing
contract (7th January 2024) for up to 6 months. 
The value of the Contract is estimated at four million, two hundred and fifty thousand
pounds sterling (£4,250,000) exclusive of VAT. 
Members are advised that the Council at its meeting on 17 August 2023 agreed that, in
order to allow sufficient time for the procurement to conclude and the new contract to be
mobilised, the current contracts be extended for a short period of time, of between three
and six months, beyond their January 2024 expiry date and authority be delegated to the
Chief Executive to finalise the detail and period of the contract extensions. 
Item 17
Page 191 of 196

Page 192

1. Background 
1.1 The initial period of the Housing and Corporate Repairs and Maintenance contract and
the Gas Central Heating Repairs and Maintenance contracts expired in January 2021,
with the option to extend for a further 3 years. 
1.2 The extensions from January 2021 to January 2024 have been previously agreed by
committee. 
1.3 Members are advised that the Council at its meeting on 17 August 2023 agreed that,
in order to allow sufficient time for the procurement to conclude and the new contract
to be mobilised, the current contracts be extended for a short period of time, of between
three and six months, beyond their January 2024 expiry date and authority be
delegated to the Chief Executive to finalise the detail and period of the contract
extensions. 
1.4 The contractors proposed for these works are the incumbents. 
2. Report 
2.1  The vehicle to implement the extension was in accordance with General Contract
Standing Orders (GCSO's) 38 and Regulation 72 of the Public Contracts (Scotland)
Regulations 2015. 
 
The value of the extension for the Housing and Corporate Repairs and Maintenance
services has value of approximately £4,600,000 per month, it is anticipated that this
agreement will be in place for up to 6 months, therefore the anticipated value of the
negotiated tender is £27,500,000. 
2.2  The value of the extension for the Gas Central Heating Repairs and Maintenance
services has value of approximately £710,000 per month, it is anticipated that this
agreement will be in place for up to 6 months, therefore the anticipated value of the
negotiated tender is £4,250,000. 
Recommendations
It is recommended that the Housing Committee: 
1) Acknowledges the application of a short term extension to Mears Scotland LLP for
the continued delivery of the Housing and Corporate Repairs and Maintenance
contract for a period of up to 6 months. 
2) Acknowledges the application of a short term extension to Saltire Facilities
Management Limited for the continued delivery of the Gas Central Heating contract
for a period of up to 6 months. 
The Plan for North Lanarkshire
Priority  Support all children and young people to realise their full potential
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth
Programme of Work Statutory / corporate / service requirement
Page 192 of 196

Page 193

2.3 The Enterprise contract will see approximately 42 contracts transition under the one
delivery vehicle.  A number of contracts that will transition have statutory compliance
implications, therefore it is critical that service continuity is maintained. 
2.4  The majority of the contracts within the scope of the Enterprise contract have been
reprocured in the past few years, the duration of the contracts was designed to align
with the commencement of the new contract.  A number of short-term measures have
been implemented in line with GCSO 3.2.5 (direct award by Chief Officer) to ensure
service continuity is maintained. 
2.5  The mobilisation of the transitioning contracts will need to be agreed with the successful
bidder once the procurement process for the new Enterprise Strategic Vehicle has
concluded. Further short-term measures may have to be determined based on when
the contracts can be mobilised by the bidder.  
2.6  The costs associated with contract delivery will be contained within the HRA budget. 
3. Measures of success 
3.1 Continuity of service is maintained; 
3.2 The procurement procedures are compliant with procurement legislation and internal
policies; 
3.3 Best Value is both demonstrable and achieved. 
4. Supporting documentation 
4.1 Not applicable.   
Brian Lafferty
Chief Officer Housing Property Services 
Page 193 of 196

Page 194

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Legal risk exists due reliance on regulation 72 of the Public Contracts (Scotland)
Regulations 2015. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
 
 
Page 194 of 196

Page 195

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Risks exist surrounding the mobilisation of the new Enterprise Strategic Vehicle,
service continuity is critical for a number of contracts that are expected to transition
into the new contract, details of when transition will occur is not yet known,
therefore the service are continuing to procure and direct award interim measures
to ensure continuity of service is achieved.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 195 of 196

Page 196

Page 196 of 196