Democracy Spraffa

Agenda reports pack

Argyll and Bute Council · 24 January 2024
Back to Planning, Protective Services and Licensing Committee — 24 January 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
17 January 2024 
NOTICE OF MEETING 
A meeting of the PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE will be
held BY MICROSOFT TEAMS on WEDNESDAY, 24 JANUARY 2024 at 11:00 AM, which you are
requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTES 
(a) Planning, Protective Services and Licensing Committee held on 20
December 2023 (Pages 3 - 30)  
(b) Planning, Protective Services and Licensing Committee held on 16
January 2024 (Pages 31 - 34) 
4. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: TAXI SURVEY (Pages 35 - 40)  
Report by Executive Director with responsibility for Legal and Regulatory Support
* 5. CIVIC GOVERNMENT (SCOTLAND) ACT 1982 - LICENSING FEES IN
PREPARATION FOR LICENCE RENEWALS (Pages 41 - 50)  
Report by Executive Director with responsibility for Legal and Regulatory Support 
6. OBAN AND HELENSBURGH STRATEGIC DEVELOPMENT FRAMEWORKS
(Pages 51 - 58)  
Report by Executive Director with responsibility for Development and Economic
Growth 
Public Document Pack

Page 2

Items marked with an “asterisk” are items, on the basis of information available at the time this
Agenda is published, on which the Committee may not have delegated powers to act, and which
may therefore require to be referred to the Council or another Committee, and that referral may
depend on the decision reached at the meeting. 
Planning, Protective Services and Licensing Committee 
Councillor John Armour Councillor Gordon Blair
Councillor Jan Brown Councillor Audrey Forrest
Councillor Kieron Green (Chair) Councillor Amanda Hampsey (Vice-Chair)
Councillor Daniel Hampsey Councillor Graham Hardie
Councillor Mark Irvine Councillor Andrew Kain
Councillor Paul Donald Kennedy Councillor Liz McCabe
Councillor Luna Martin Councillor Dougie Philand
Councillor Peter Wallace   
Contact: Fiona McCallum                  Tel. No. 01546 604392

Page 3

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE
held BY MICROSOFT TEAMS on WEDNESDAY, 20 DECEMBER 2023 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown
Councillor Amanda Hampsey
Councillor Daniel Hampsey
Councillor Graham Hardie 
Councillor Mark Irvine
Councillor Paul Donald Kennedy
Councillor Liz McCabe
Councillor Luna Martin
Councillor Dougie Philand
Councillor Peter Wallace 
Attending: Shona Barton, Governance Manager
Peter Bain, Development Manager
Sandra Davies, Major Applications Team Leader
Bryn Bowker, Area Team Leader – Mid Argyll, Kintyre and the Islands
Arlene Knox, Senior Planning Officer
Shelley Gould, Senior Planning Officer
Fiona Scott, Planning Officer
Norman Shewan, Planning Officer 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Audrey Forrest and Andrew Kain. 
2. DECLARATIONS OF INTEREST 
Councillor John Armour declared a non-financial interest in planning application reference
23/01018/PP as it concerned a farm neighbouring his own business and he had also been
lobbied by local residents.  He indicated that he would take no part in the determination of
this application which was dealt with at item 8 of this Minute, but would remain in the
meeting. 
3. MINUTES 
a) The Minute of the Planning, Protective Services and Licensing Committee held on 20
November 2023 was approved as a correct record. 
b) The Minute of the Planning, Protective Services and Licensing Committee held on 22
November 2023 at 11.00 am was approved as a correct record. 
c) The Minute of the Planning, Protective Services and Licensing Committee held on 22
November 2023 at 2.00 pm was approved as a correct record. 
d) The Minute of the Planning, Protective Services and Licensing Committee held on 22
November 2023 at 3.00 pm was approved as a correct record. 
e) The Minute of the Planning, Protective Services and Licensing Committee held on 28
November 2023 was approved as a correct record. 
Page 3 Agenda Item 3a

Page 4

4. TSL CONTRACTORS LTD: DETAILED PLANNING APPLICATION FOR THE
ERECTION OF RESIDENTIAL DEVELOPMENT COMPRISING 97 RESIDENTIAL
UNITS AND A COMMERCIAL UNIT (CLASS 1) WITH ALL ASSOCIATED
EXTERNAL WORKS AND LANDSCAPING: LAND NORTH WEST OF ISLE OF
MULL HOTEL, CRAIGNURE, ISLE OF MULL (REF: 22/01418/PP) 
The Major Applications Team Leader spoke to the terms of the report.  The proposal
seeks to develop an allocated housing site within LDP2 to provide 97 dwellings of various
sizes.  The site is located in the rural area, with the housing allocation playing a pivotal
role in meeting the housing needs of the island. 
The Examination by Scottish Government Reporters to the Argyll and Bute Local
Development Plan 2 (LDP2) has now concluded and the Examination Report has been
published.  Although still to be formally adopted it is considered that LDP2 carries
sufficient weight to outweigh the designation of land as countryside in the adopted LDP.   
The development would still be a minor departure from LDP2 as a small area to the north
west of the site lies out with the allocation and within the countryside zone.  No houses are
proposed in this area and it would be required to accommodate one of the two
Sustainable Urban Drainage Areas (SUDs) required for draining the site. 
It was recommended that planning permission be granted subject to the conditions and
reasons detailed in the report of handling. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 8/7/22; , supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan as
Existing
200661A-10-002 Rev.D 06/09/2022
Topographical
Survey Plan as
Existing
200661A-10003 Rev.A 06/09/2022
Location Plan –
Craignure
Context as
Existing
200661A-10-001 Rev.C 06/09/2022
Location Plan as
Proposed
200661A-PL-001 Rev.G 09/11/2023
Site Plan as
Proposed 
200661A-PL-003  Rev.C 9/11/2023
Site Cross 200661A-PL-002 Rev.A 18/08/2022
Page 4

Page 5

Section Detail as
Proposed
External Levels
Layout
J5336-001  11/07/2022
Drainage Layout J5336-011 Rev.F 09/03/2023
Cottage Flats-
Affordable Plans
& Elevations
200661A-PL-010 Rev.A 18/08/2022
2 & 3 Bed
Terrace- AFF.
Plans &
Elevations
200661A-PL-011 Rev.B 06/09/2023
3 Bed Semi-
Detached –AFF
Plans &
Elevations
200661A-PL-012  11/07/2022
1 Bed Flats- PFS
Plans &
Elevations
200661A-PL-013 Rev.A 18/08/2022
2 Bed Flats –PFS
Plans &
Elevations
200661A-PL-014 Rev.A 18/08/2022
2 Bed Bungalow
– PFS Plans &
Elevations
200661A-PL-015 Rev.A 18/08/2022
3 Bed Flat &
Retail Uni- PFS
Plans &
Elevations
200661A-PL-016  Rev.B 05/04/2023
3 Bed Semi
Detached- PFS
Plans &
Elevations
200661A-PL-017 Rev.A 18/08/2022
3 Bed Detached-
PFS Plans &
Elevations
200661A-PL-018  11/07/2022
4 Bed Detached-
ST- PFS Plans &
Elevations
200661A-PL-019  11/07/2022
4 Bed Detached
In- PFS Plans &
Elevations
200661A-PL-020  11/07/2022
4 Bed Detached
Wide- PFS Plans
& Elevations
200661A-PL-021 Rev.A 18/08/2022
4 Bed Detached
Large- PFS
Plans &
Elevations
200661A-PL-022  11/07/2022
2 & 3 Bed
Terrace – AFF.
Combined Plans
200661A-PL-023 Rev.A 06/09/2022
Page 5

Page 6

3 Bed Detached
– Handed Plans
& Elevations
200661A-PL-024  18/08/2022
4 Bed Detached
St – Handed
Plans &
Elevations
200661A-PL-025  18/08/2022
4 Bed Detached
Inv-Handed
Plans &
Elevations
200661A-PL-026  18/08/2022
4 Bed Detached
Wide-Handed
Plans &
Elevations
200661A-PL-027  18/08/2022
4 Bed Detached
Large-Handed
Plans &
Elevations
200661A-PL-028  18/08/2022
1 & 2 Bed Flats –
PFS Plans &
Elevations
200661A-PL-029  06/09/2022
Garage Units
Plans &
Elevations
200661A-PL-051  18/08/2022
Vehicle Swept
Path Analysis for
a Refuse Vehicle
J5336-004  11/07/2022
Proposed
Landscape
Layout
1641-01 Rev.F 18/08/2022
Softworks
Specification &
Maintenance
1641-03 Rev.B 04/07/2023
Proposed trees
to be removed &
retained
1641-02 Rev.B 04/07/2023
Waste Strategy &
Bin Storage
200661A-PL050  Rev.A 06/09/2022 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
Note to Applicant: 
• This planning permission will last for three years from the date of this decision
notice, unless the development has been started within that period [See section
58(1) of the Town and Country Planning (Scotland) Act 1997 (as amended).] 
• In order to comply with Sections 27A(1)  of the Town and Country Planning
(Scotland) Act 1997, prior to works commencing on site it is the responsibility of the
developer to complete and submit the attached ‘Notice of Initiation of Development’
Page 6

Page 7

to the Planning Authority specifying the date on which the development will start.
Failure to comply with this requirement constitutes a breach of planning control
under Section 123(1) of the Act. 
In order to comply with Section 27B(1) of the Town and Country Planning (Scotland)
Act 1997 it is the responsibility of the developer to submit the attached ‘Notice of
Completion’ to the Planning Authority specifying the date upon which the development
was completed. 
2. Archaeological Works 
No development shall take place within the development site as outlined in red on the
approved plan until the developer has secured the implementation of a programme of
archaeological works in accordance with a written scheme of investigation which has
been submitted by the applicant, agreed by the West of Scotland Archaeology Service,
and approved by the Planning Authority. Thereafter the developer shall ensure that the
programme of archaeological works is fully implemented and that all recording and
recovery of archaeological resources within the development site is undertaken to the
satisfaction of the Planning Authority in agreement with the West of Scotland
Archaeology Service. 
Reason: In order to comply with the requirements of NPF4 Policy 16F. 
3. Requirement for Public Sewerage Connection 
The development hereby approved shall connect to the public sewerage system. 
Reason: The site is located within a settlement area served by a public sewer.  The
use of a private system would be a material change and would require the submission
of a further planning application. 
4. Open Space Provision 
No development shall commence until details for the provision and maintenance of
areas of communal open space and equipped play area(s) identified on the approved
plans have been submitted to and approved in writing by the Planning Authority. The
details shall comprise: 
(i) Provision to satisfy the minimum standards set out in the Development Plan; 6sqm
of equipped play space and 12sqm of informal open space per dwelling unit;
(ii) Specification of play equipment to be installed, including surface treatments and
any means of enclosure, designed in accordance with the provisions of BS5696
(Play Equipment Intended for Permanent Installation Outdoors);
(iii) Proposals for the timing of the implementation of the play area(s) in relation to the
phasing of the development.  The equipped children’s play area shall be completed
before the occupation of the 50th dwelling;
(iv) A maintenance schedule for communal open spaces and equipped play areas in
accordance with the provisions of BS5696 including details of on-going inspection,
recording and procedures for detailing with defects. 
Page 7

Page 8

The communal open space and equipped play area(s) shall be provided in accordance
with the duly approved details and shall be retained and maintained to the specified
standards thereafter. 
Reason: In order to secure provision of communal open space and equipped play
areas within the development in accordance with the requirements of NPF4 Policy
16F. 
5. Construction Environmental Management Plan 
No construction works shall be commenced until a Construction Environmental
Management Plan (CEMP) and a Site Waste Management Plan (SWMP) have been
submitted to and approved in writing by the Planning Authority.  The CEMP shall be
overseen by an Ecological Clerk of Works (ECoW) and shall cover the following
details: 
Public Protection Issues: 
a) Consideration of all local noise sensitive receptors and the impact which
would be had during land clearance and construction and the controls for
this
b) The use of equipment, such as mobile crushers and pecking equipment
which may be in use and the controls which are put in place for these
c) Any controls for dust on the site to ensure that this does not cause a
nuisance to nearby receptors
d) Any site lighting which may be used during the project and how this will be
controlled so as not to cause a light nuisance to local receptors
e) Proposed hours of works
f) Best Practical Means measures to be put in place during any land clearance
and construction work phases.  
Biodiversity Issues: 
(a)        No development shall commence until a scheme for the retention and
safeguarding of trees during construction has been submitted to and
approved by the Planning Authority. The scheme shall comprise: 
i) Details of all trees to be removed and the location, canopy spread and
root zone of trees to be retained as part of the development;
ii) A programme of measures for the protection of trees during construction
works which shall include fencing at least one metre beyond the canopy
spread taking account of root zone of each tree in accordance with BS
5837:2012 “Trees in Relation to Design, Demolition and Construction”. 
Tree protection measures shall be implemented for the full duration of
construction works in accordance with the duly approved scheme. No trees
shall be lopped, topped or felled other than in accordance with the details of
the approved scheme unless otherwise approved in writing by the Planning
Authority. 
(b)        Prior to the commencement of development an updated habitat survey shall
be carried out, the findings of which shall be submitted to and approved in
Page 8

Page 9

writing with the planning authority- this information should form part of a
Habitat Management Plan. 
(c)        If tree works are proposed during the bird nesting season (March – August
inclusive) a pre-commencement inspection for active bird nests should be
carried out by a suitably qualified person.  Only if there are no active nests
present should works proceed.
(d)        Otter mitigation shall be undertaken in accordance with the
recommendations contained within the original ecological survey for otter
- An ecological toolbox talk will be presented to all site contractors as part of
their pre-works site induction in accordance with best practice;
- Where the species data is older than 18 months, the reported baseline
should be updated by further survey work and included as part of a Species
Management Plan outlining the species management for each of the species
mentioned ( Otter, Bats both European protected Species, birds ( none
specific). 
(e)        If any of the trees which have been identified as being suitable for bats are
to be removed between May-September, a further inspection of these trees
shall be carried out by a licensed Bat worker prior to their removal. A
European Protected Species Licence will need to be acquired from
NatureScot in order for the bats to be translocated by a licenced Bat Worker. 
(f)         An ecological toolbox talk on bats and what to do if bats or field signs of
bats are encountered shall be presented to all site contractors as part of
their pre-works site induction.         
Further information can be found in the Biodiversity Technical Note in terms
of surveys and mitigation calendars Page 20 and 21: https://www.argyll-
bute.gov.uk/sites/default/files/biodiversity_technical_note_feb_2017_4.pdf 
(i)        An Invasive Non Native Species Eradication Plan for Rhododendron
ponticum should be included in the CEMP ready for implementation. 
(j)      Details of pollution controls during construction.         
Reason:  In order avoid, minimise or mitigate effects on the environment and
surrounding area. 
6. White Tailed Sea Eagle           
Prior to the commencement of development confirmation of the outcome of
discussions with the Mull RSPB Officer (currently Dave Sexton) with regard to
requirements for a Bird Protection Plan for White Tailed Eagle shall be submitted to
and approved in writing by the Planning Authority. In the event that a Bird Protection
Plan is required, this shall be submitted to and approved in writing by the Planning
Authority prior to the commencement of development.  Thereafter the development
shall proceed in accordance with this plan. 
Reason: In order to establish whether a Bird Protection Plan will be required as the
nesting locations of White Tailed Sea Eagles varies each year. 
Page 9

Page 10

7. Drainage Maintenance Arrangements 
Prior to the commencement of approved drainage works, details of the maintenance
responsibility and schedule of intended maintenance arrangements of the approved
drainage works shall be provided to the Planning Authority for their approval. This
schedule shall include inspection, recording and procedures for detailing with defects.
For the avoidance of doubt this shall also include the maintenance of the SUDs ponds.
The drainage works for the development shall thereafter be maintained in accordance
with the approved details. 
Reason: To ensure appropriate maintenance provisions in respect of the approved
drainage details are secured in the interests of alleviating any potential flood risk
arising from surface water.   
8. Landscaping Details 
No development shall commence until a scheme of boundary treatment, surface
treatment and landscaping has been submitted to and approved in writing by the
Planning Authority. The scheme shall comprise a planting plan and schedule which
shall include details of: 
i) Existing and proposed ground levels in relation to an identified fixed datum;
ii) Existing landscaping features and vegetation to be retained;
iii) Location design and materials of proposed walls, fences and gates;
iv) Proposed soft and hard landscaping works including the location, species
and size of every tree/shrub to be planted;
v) Details of compensatory tree planting as show on the proposed landscape
drawing produced by Hirst Landscape Architects (1641 01 rev F).
vi) A programme for the timing, method of implementation, completion and
subsequent on-going maintenance.
vii) Surface materials proposed for private communal parking areas. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme unless otherwise approved in writing by the Planning Authority. 
Any trees/shrubs which within a period of five years from the completion of the
approved landscaping scheme fail to become established, die, become seriously
diseased, or are removed or damaged shall be replaced in the following planting
season with equivalent numbers, sizes and species as those originally required to be
planted unless otherwise approved in writing by the Planning Authority. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity. 
9. Road Built to Adoptable Standards 
All new roads other than private accesses serving no more than 5 dwellings shall be
built to an adoptable standard in accordance with Designing Streets and the National
Roads Development Guide. 
Reason: In the interests of road safety to ensure the provision of a road commensurate
to the scale of development. 
Page 10

Page 11

10. 20mph Speed Limit 
Within 12 months of the occupation of the first dwelling house the internal road network
shall have a 20mph limit. 
Reason: In the interests of road safety. 
11. Junction Improvements 
Full details of improvements to the existing junction of the UC80 and the A849 shall be
submitted to and approved in writing by the Planning Authority in consultation with the
Road Network Manager.  This shall include resurfacing of the UC80 east footway from
the junction of the development to the A849. 
Reason: In the interests of road safety. 
12. Visibility Splays 
Prior to work starting on site the junction of the development access with the UC80
shall have a visibility splay of 42m x 2.4m x 1.05m.  The final wearing surface on the
access shall be completed prior to the development first being brought into use and the
visibility splays shall be maintained clear of all obstructions thereafter. 
Reason: In the interests of road safety. 
13. 40mph Speed Limit 
No development shall commence until a 40mph speed limit is introduced on the A849
from the existing 30mph limit at Craignure to an agreed location west of the UC80. 
Prior to the implementation of this speed limit full details of the extent of the speed limit
shall be submitted to and approved in writing by the Planning Authority in consultation
with the Road Network Manager. 
Reason: In the interests of road safety. 
14. Traffic Management Plan 
Prior to development commencing, a Traffic Management Plan shall be submitted to
and approved in writing by the Planning Authority in consultation with the Area Roads
Engineer. The Plan shall detail the phasing of the construction elements of the
development, a proposed phasing schedule of the plant and materials deliveries to
site, proposed and approved access routes, agreed operational practices, and shall
provide for the provision of an appropriate Code of Practice to drivers of construction
and delivery vehicles. The development shall be implemented in accordance with the
duly approved Traffic Management Plan unless as otherwise may be agreed in writing
by the Area Roads Engineer. 
Reason: To address traffic associated with the construction of the development in the
interests of road safety and having regard to the access arrangements to the site. 
15. Electric Vehicle Charging 
Page 11

Page 12

Prior to any dwelling being occupied which has private in-curtilage parking provision, 
dedicated cable ducting connecting each private residential parking space to the
nearest electricity supply connection point capable of supporting the installation of a 7
kilowatt EV charging point shall be provided. 
Prior to dwellings being occupied where communal parking is proposed, a minimum of
one EV charging point for every five residential communal off street spaces shall be
provided.  In addition, dedicated cable ducting shall be installed to allow all remaining
communal parking spaces to be provided with a charging point in the future. 
Reason: To ensure that the development has adequate provision for the charging of
EVs in accordance with policy 34 of LDP2. 
16. Biodiversity Enhancement Measures 
Biodiversity enhancement measures shall be undertaken in accordance with the
Biodiversity Measures document dated 11th July 2023.  Prior to the occupation of the
first dwelling further details of the proposed enhancements as detailed in this
document including their design, location and timing of completion shall be submitted
to and approved in writing by the Planning Authority.  Thereafter these biodiversity
enhancement shall by maintained in accordance with these details. 
Reason:  To ensure that the development includes biodiversity enhancements as
required by NPF4 Policy 3. 
17. No Permission for Care Home or Nursery 
No permission is given or implied for the proposed nursery or care home shown
indicatively on the approved site plan. 
Reason:  For the avoidance of doubt.   
18. Hours of Construction 
The permitted hours of construction works shall be restricted to 08:00 hours to 18:00
hours Monday to Friday and 08:00 hours to 13:00 hours on Saturday. No construction
works shall take place outwith these hours, or on Sundays or Bank Holidays, unless
the written agreement of the Planning Authority has been obtained in advance, in
which case the specified operations shall be confined to activities which do not present
any likely source of nuisance in terms of noise, vibration, dust or any other
consequence likely to be prejudicial to the interests of residential amenity. 
Reason: In order to protect the residential amenities of the area. 
19. Affordable Housing 
Plots 74 to 97 shall only be managed by a Registered Social Landlord (a body
registered under part 3 chapter 1 of the Housing (Scotland) Act 2001, or any
equivalent provision in the event of the revocation and re-enactment thereof, with or
without modification) and shall not enure for the benefit of any other person, company
or organisation. 
Page 12

Page 13

Reason: To ensure the provision of affordable housing to the standard required by the
development plan in the absence of any other agreed means of securing such
provision. 
20. Materials 
No development shall commence until full details /samples of materials to be used in
the construction of the dwelling houses and commercial unit hereby approved have
been submitted to and approved in writing by the Planning Authority.  The
development shall thereafter be completed using the approved materials or such
alternatives as may be agreed in writing with the Planning Authority. 
Reason:  In order to integrate the development into its surroundings. 
21. Arrangements for Waste 
No development shall commence until a waste strategy detailing how much waste
the proposal is expected to generate and detailing the arrangements for the storage,
separation and collection of waste from the site, including provision for the safe pick
up by refuse collection vehicles, have been submitted to an approved in writing by the
Planning Authority. Thereafter the duly approved provision shall be implemented prior
to the first occupation of the dwellings which it is intended to serve. 
Reason:  In order to ensure that satisfactory arrangements have been made for
dealing with waste on the site in accordance with NPF4 Policy 12 and Policy SG LDP
SERV 5 (b). 
22. Finished Floor Levels 
No development shall commence until details of the proposed finished ground floor
level of the development relative to an identifiable fixed datum located outwith the
application site have been submitted to and approved in writing by the Planning
Authority. The development shall be implemented in accordance with the approved
details. 
Reason: In order to secure an acceptable relationship between the development and
its surroundings.
23. Phasing of Development
The development hereby approved shall be constructed in accordance with the
potential phasing plan contained within the supporting Design and Access Statement
(8.1 Potential Phasing, p53) unless otherwise agreed in writing with the Planning
Authority.
Reason: In order to ensure that the affordable housing is delivered in a timely manner. 
24. Prior to the commencement of development full details of water conservation
measures to be included within the development shall be submitted to and approved in
writing by the Planning Authority.  Thereafter the development shall be implemented
with these details.
Page 13

Page 14

Reason: In the interests of water conservation. 
(Reference: Report by Head of Development and Economic Growth dated 7 December
2023, submitted) 
5. MRS KAREN DAVIES: PARTIAL CHANGE OF USE OF FLAT TO FORM
TEACHING FACILITIES: 3 WOODSTONE COURT, PIER ROAD, RHU,
HELENSBURGH (REF: 22/01712/PP) 
The Planning Officer spoke to the terms of the report.  He advised of a correction to the
report of handling in respect of comments submitted by Environment Health and stated
that these comments detailed within the report did not have the status of a full consultation
response and related to an informal communication between Officers. 
The proposed development is a partial change of use where a total of some 60m² of floor
space is proposed to be used as a retreat centre to learn meditation and mindfulness with
spiritual teaching.  The proposed use will operate with weekly programmes largely within
the hours of 9.30 -16:30 with occasional evening use within the hours 19:00 – 21:30.   
The site is located within the residential area in the settlement of Rhu.  A total of 19
representations have been received, 4 in support and 15 objections, the details of which
were contained within section F of the report. 
It was considered highly likely that the proposal would result in an inadequate level on-site
car parking provision leading to increased demand for car parking in non-designated
parking areas, private roads and public roads within the locality to the detriment of
highway safety and the free-flow of traffic. In the absence of adequate information to
demonstrate otherwise, Officers consider that the proposal is contrary to the provisions of
NPF 4 Policy 13; the adopted LDP – 2015 Policy LDP 11 and SG LDP TRAN 4 and SG
LDP TRAN 6; and LDP 2 Policy 40. 
Officers also considered that the proposal was an inappropriate use in a residential
context and was contrary to the provisions of LDP Policy 8 and 9, SG LDP BAD 1 and
Proposed LDP2 Policy 14.   
It was therefore recommended that planning permission be refused for the reasons
detailed in the report of handling. 
Decision 
The Committee agreed to refuse planning permission for the following reasons: 
1. Argyll and Bute Local Development Plan – Adopted 2015 Policy LDP 8 and SG LDP
BAD 1 – Bad Neighbour Development and the emerging Proposed Argyll and Bute
Local Development 2 Policy 14 serves to resist any proposal that would have an
unacceptable adverse impact upon the amenity of neighbouring land uses resulting
from noise, vibration, etc. In addition Policy LDP 9 – Development Setting, Layout and
Design seeks to ensure that a high standard of appropriate design that is compatible
with the surroundings. It is considered that the nature and scale of the proposal which
is a non-residential institutional use, proposed to have week-long courses for groups of
12-15 teachers/students/practitioners within two rooms of a 2-bedroom flat contained
in a block of 9 no. residential units is inappropriate. This is due to the access to the
proposed teaching/retreat use from the grounds of the building, being via a communal
Page 14

Page 15

hallway and stairwell shared with a number other residential properties. The flat
subject of the application is located on the first floor, with other flats located directly
above and below it. No information has been submitted to date with regard to the
construction specification of the floor zones between these flats, or the sound
insulation performance of the floor construction. In addition, no sound surveys between
the flats has been submitted in support of the application. There is a conflict with
existing homogenous residential use and potential significant adverse impact on
residential amenities. Therefore, this proposal is inappropriate use in a residential
context and is contrary to the provisions of LDP Policy 8 and 9, SG LDP BAD 1 and
Proposed LDP 2 Policy 14. 
2. Argyll and Bute Local Development Plan – Adopted 2015 Policy 11 and SG LDP TRAN
6; and the emerging Proposed Argyll and Bute Local Development Plan 2 Policy 40
serve to require that proposed development that will result in an intensification of traffic
and demand for car parking will only be supported where the proposed development
includes adequate on site car parking to accommodate all existing car parking
demand, and any intensification of demand by virtue of the development proposal. It is
considered that the proposed partial change of use from a 2 bedroom residential flat to
a commercial use comprising a retreat centre to teach and practice spiritual disciplines
including meditation and mindfulness by means of weekly programmes for groups of
12-15 participants during the hours of 9.30-4.30, with the occasional evening use 7-
9.30, will result in a substantial intensification of traffic using the existing public/private
access regime and on site car parking provision. Whilst the applicant has suggested
that groups attending the sessions will be bussed in and out of the premises using a
mini-bus or similar, officers do not consider that this is a sufficiently robust justification
for accepting development that appears, on the basis of information submitted, to be
deficient in car parking spaces with reference to the Council’s adopted standards. The
supporting information indicates that there are 15 no. existing spaces however this
cannot be verified from the drawings submitted and it is not clear that all of these
spaces are within the ownership or control of the applicant. Existing parking provision
would be based on an application of the standards for residential units i.e the number
of residences and the number of bedrooms that each residence has. The adopted
standard is 1½ spaces per 1-bedroom unit, 2 spaces per 2-3 bedroom unit; and 3
spaces per unit with 4 or more bedrooms. The applicant has submitted inadequate
information to allow an assessment of the number and location of existing on-site
parking spaces to meet the current demand. The adopted parking standards relative to
a non-residential institution use is 1 space per two staff plus 3 spaces per 100m2. The
application drawings show approximately 75m2 of floorspace to be used for
teaching/meditation, which would result in a minimum requirement for 1 additional
parking space, plus a further space per two staff members, including visiting teachers.
However, as the supporting information advises, it is intended that the rooms be used
by groups of up to 15 people at a time, which will result in a significantly higher
demand for car parking provision than an application of the adopted standards. The
information submitted does not demonstrate to the satisfaction of the planning
authority that the proposal can provide adequate space for car-parking and
manoeuvring within the site to accommodate the current demand for car parking, plus
the intensified demand likely to result from the proposed change of use with regard to
adopted standards. It is considered highly likely that the proposal would result in an
inadequate level on-site car parking provision leading to increased demand for car
parking in non-designated parking areas, private roads and public roads within the
locality to the detriment of highway safety and the free-flow of traffic. In the absence of
adequate information to demonstrate otherwise, officers consider that the proposal is
Page 15

Page 16

contrary to the provisions of NPF 4 Policy 13; the adopted LDP – 2015 Policy LDP 11
and SG LDP TRAN 4 and SG LDP TRAN 6; and LDP 2 Policy 40. 
(Reference: Report by Head of Development and Economic Growth dated 7 December
2023, submitted) 
Councillor Dougie Philand joined the meeting during consideration of the foregoing item. 
6. MR KEVIN BURNETT: RENEWAL OF PLANNING PERMISSION IN PRINCIPLE
REFERENCE 18/02720/PPP - SITE FOR PROPOSED RESIDENTIAL
DEVELOPMENT: SITE AT LONAN DRIVE, OBAN: (REF: 23/00376/PPP) 
The Planning Officer spoke to the terms of the report.  Before proceeding with her
presentation she advised of an email received from Mr Moncrieff attaching a video which
showed water running through the site.  No commentary accompanied this video and
there was no indication of when the video had been taken. 
This application is seeking to secure Planning Permission in Principle (PPP) for a
residential development on an area of land at Lonan Drive, Oban. 
The principle of the development on this site has been established by the granting of PPP
reference 18/02720/PPP following a discretionary pre determination hearing.  Whilst the
previous PPP expired on 31 March 2023, it is considered to represent a material
consideration in the current application which was submitted and validated within the
lifetime of the previous permission and which effectively seeks to renew the original PPP. 
The application has been the subject of 77 objections from 66 households, one
representation and an objection from Oban Community Council.  Officers consider that
issues and concerns expressed do not raise any matters that were not previously
considered at the hearing. 
Since the previous permission was granted, there has been no change in the main policy
background within this area and there have been no material changes in circumstances in
the locality or in the previously approved access or servicing arrangements which would
preclude the renewal of the previous permission. 
It was recommended that planning permission in principle be granted subject to the
conditions and reasons detailed in the report. 
Decision 
The Committee agreed to grant planning permission in principle subject to the following
conditions and reasons: 
Standard Time Limit Condition (as defined by Regulation) 
Additional Conditions 
1. PPP – Matters Requiring AMSC Submission 
Plans and particulars of the matters specified in conditions 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14
and 15 below shall be submitted by way of application(s) for Approval of Matters Specified in
Conditions in accordance with the timescales and other limitations in Section 59 of the Town
Page 16

Page 17

and Country Planning (Scotland) Act 1997 as amended. Thereafter the development shall be
completed wholly in accordance with the approved details. 
Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act 1997 as
amended. 
Note to Applicant 
Regard should be had to Scottish Waters consultation comments and the Oban and District
Access Panels comments in relation to the proposed development, details of which are
available to view via the Public Access section of the Council’s website. 
2. PPP – Approved Details 
The development shall be implemented in accordance with the details specified on the original
application form dated 18/12/18 and the previously approved drawings listed in the table
below. 
Plan Title. Plan Ref. No. Version Date Received
Site and Location Plan  1441 01  b 09/03/23
Indicative Site Plan & Site
Sections 
1440 L(--)01 g 09/03/23
Site Sections  1440 L(--)02 a 09/03/23
Road Layout at Lonan Drive  601775-DRG-0001-
P1 
09/03/23
Road Details at Lonan Drive  601775-DRG-0002-
P1 
09/03/23 
Reason:  To accord with Regulation 28 of the Town and Country Planning (Development
Management Procedure) (Scotland) Regulations 2008. 
3. PPP – Timescale to be Agreed for Completion 
Pursuant to Condition 1 - no development shall commence until details of the proposed
timescale for completion of the approved development have been submitted to and approved
by the Planning Authority. Thereafter, the development shall be implemented in accordance
with the duly approved timescale for completion unless an alternative timescale for completion
is otherwise agreed in writing with the Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F. 
4. PPP – Roads and Access 
Pursuant to Condition 1 – no development shall commence until details of the proposed
service road and connection with the existing public road have been submitted to and
approved by the Planning Authority. Such details shall incorporate: 
i) A vehicular access layout providing a Road over which the public has a right of access in
terms of the Roads (Scotland) Act 1984;
ii) A turning head for the public service vehicle;
iii) Details of the priority signage for the access into the site. 
Prior to work starting on site, the junction with the existing public road shall be fully formed and
surfaced with all access roads and footways granted consent constructed to at least base
course level prior to any work starting on the erection of the buildings which they are intended
to serve and the final wearing surface of the roads and footways shall be applied concurrently
with the construction of the final building.
Page 17

Page 18

Reason: In the interests of road safety and to ensure the timely provision of a service road
commensurate to the scale of the overall development and having regard to the status of the
proposed access as a residential service road. 
Note to Applicant: 
Road Construction Consent under the Roads (Scotland) Act 1984 must be obtained from the
Council’s Roads Engineers and a Road Bond provided prior to the formation of the access
within the development site. 
5. PPP – Parking Provision 
Pursuant to Condition 1 – no development shall be commenced in respect of any individual
building until plans and particulars of the means of parking/turning arrangements to serve that
building have been submitted to and approved by the Planning Authority. Such details shall
incorporate:   
i) The provision of parking and turning in accordance with the requirements of
Supplementary Guidance SG LDP TRAN 6 of the adopted ‘Argyll and Bute Local
Development Plan’ 2015. 
The approved parking and turning layout to serve the buildings shall be implemented in full
prior to that building first being occupied and shall thereafter be maintained clear of obstruction
for the parking and manoeuvring of vehicles. 
Reason: In the interests of road safety. 
6. PPP – Sustainable Drainage System 
Pursuant to Condition 1, no development shall commence on site until full details, in plan form,
of the land drainage design for the site and details of its ongoing maintenance has been
submitted to and approved in writing by the Planning Authority.  Such details shall show a
drainage system designed in accordance with CIRIA C753 and Sewers for Scotland 4th
Edition. 
Reason:  In order to safeguard the development from the possibility of flooding. 
Note to Applicant 
Regard should be had to JBA Consulting Ltd consultation comments in relation to the
proposed development, details of which is available to view via the Public Access section of
the Council’s website. 
7. PPP – Design and Finishes 
Pursuant to Condition 1 – no development shall commence in respect of any individual building
until plans and particulars of the site layout, open space, design and external finishes of the
development have been submitted to and approved by the Planning Authority. These details
shall incorporate: 
i) A Design Statement in accordance with the advice set out in Planning Advice Note
68 which shall establish the design principles applicable to the layout of the
development as a whole and design of the individual dwellings. 
ii) A statement addressing how the proposed development has been designed to be
consistent with the six qualities of successful places, as defined within NPF4 Policy
14;
Page 18

Page 19

iii) A statement addressing the Action Checklist for developing design contained within
the Argyll and Bute Sustainable Design Guide 2006;
iv) Local vernacular design. 
Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act 1997 as
amended, and in order to integrate the proposed dwellinghouse with its surrounds. 
8. PPP – Landscaping  
Pursuant to Condition 1 – no development shall commence until a scheme of boundary
treatment, surface treatment and landscaping has been submitted to and approved by the
Planning Authority. The scheme shall comprise a planting plan and schedule which shall
include details of: 
i) Existing and proposed ground levels in relation to an identified fixed datum;
ii) Existing landscaping features and vegetation to be retained;
iii) Location design and materials of proposed walls, fences and gates;
iv) Proposed soft and hard landscaping works including the location, species and size
of every tree/shrub to be planted;
v) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity and how these benefits will be
maintained for the lifetime of the development;
vi) A programme for the timing, method of implementation, completion and subsequent
on-going maintenance; 
All of the hard and soft landscaping works shall be carried out in accordance with the approved
scheme unless otherwise approved in writing by the Planning Authority.
Any trees/shrubs which within a period of five years from the completion of the approved
landscaping scheme fail to become established, die, become seriously diseased, or are
removed or damaged shall be replaced in the following planting season with equivalent
numbers, sizes and species as those originally required to be planted unless otherwise
approved in writing by the Planning Authority. 
All physical biodiversity enhancement measures (bird nesting boxes, ‘swift bricks’, wildlife
ponds, bat and insect boxes, hedgehog homes etc.) shall be implemented in full before the
development hereby approved is first brought into use. 
All biodiversity enhancement measures consisting of new or enhanced planting shall be
undertaken either in accordance with the approved scheme of implementation or within the
next available planting season following the development first being brought into use. 
The biodiversity statement should refer to Developing with Nature guidance | NatureScot as
appropriate. 
Reason:  To assist with the integration of the proposal with its surroundings in the interests of
amenity. 
9. PPP – Tree Retention and Protection 
Pursuant to Condition 1 – no development shall commence until a scheme for the retention
and safeguarding of trees during construction has been submitted to and approved by the
Planning Authority. The scheme shall comprise: 
i) A survey of trees on and overhanging the site indicating the location, species,
height, canopy spread and condition of each tree;
Page 19

Page 20

ii) An assessment of the amenity and nature conservation value of tree groups and
individual trees which shall inform the layout of the development proposed;
iii) Details of all trees to be removed and the location and canopy spread of trees to be
retained as part of the development;
iv) A programme of measures for the protection of trees during construction works
which shall include fencing at least one metre beyond the canopy spread of each
tree in accordance with BS 5837:2012 “Trees in Relation to Design, Demolition and
Construction”. 
The tree survey should be undertaken prior to drafting the design plan for the placement of
dwellings, verges, access routes and services. 
Tree protection measures shall be implemented for the full duration of construction works in
accordance with the duly approved scheme. No trees shall be lopped, topped or felled other
than in accordance with the details of the approved scheme unless otherwise approved in
writing by the Planning Authority. 
Reason: In order to retain trees as part of the development in the interests of amenity and
nature conservation. 
10. PPP – Japanese Knotweed Eradication Scheme 
Pursuant to Condition 1 – no development shall commence on site until full details of a scheme
for the eradication of Japanese Knotweed has been submitted to and approved in writing by
the Planning Authority in consultation with the Biodiversity Officer.  The scheme shall include a
timetable for implementation and clearly identify the extent of the Japanese Knotweed on a
scaled plan.  Prior to construction works commencing on site the approved scheme and
timetable shall be implemented in full and a validation report confirming details of the
remediation treatment carried out and confirmation that the site is free of Japanese Knotweed
shall be submitted to the Planning Authority. 
Reason:  To eradicate Japanese Knotweed from the development site and to prevent the
spread of this non-invasive species through development works. 
11. PPP – Affordable Housing 
Pursuant to Condition 1 - no development shall commence until a scheme for the provision of
affordable housing (as defined below) has been submitted to and approved by the Planning
Authority. The scheme shall: 
a) Provide that a minimum of 25% of the approved dwellings are affordable homes; 
b) Define those properties to be used as affordable homes;
c) Establish the timing of their provision relative to the phasing of the development, which
shall ensure that the last 25% of the dwellings within the development are not commenced
until the affordable housing phase has been completed for occupation;
d) Establish the arrangements to ensure the affordability of the affordable homes for both
initial and subsequent occupiers (including any discount rate applicable in terms of (ii)
below); 
For the purposes of this condition ‘affordable homes’ are defined as being either: 
i) Social housing (rented or shared ownership or shared equity) managed by a registered
social landlord (a body registered under part 3 chapter 1 of the Housing (Scotland) Act
2001, or any equivalent provision in the event of the revocation and re-enactment thereof,
with or without modification);
ii) Discounted low cost sale housing (subject to a burden under the Title Conditions
(Scotland) Act 2003), or any equivalent provision in the event of the revocation and re-
enactment thereof, with or without modification).
Page 20

Page 21

iii) Housing for sale or rent without subsidy, which is designed to be affordable and to meet
the housing needs of the majority of those households identified as in housing need in the
Local Housing Strategy or Housing Market Study i.e. one or two person households on
average income, with conditions attached to their missives to prevent further extension,
thereby helping to ensure that they are likely to remain affordable to subsequent
purchasers. 
The development shall be implemented and occupied thereafter in accordance with the duly
approved scheme for affordable housing. 
Reason:  To accord with the provisions of the Development Plan in respect of affordable
housing provision. 
12. PPP – Ecological Surveys 
Pursuant to Condition 1 - no development shall commence until full details of a Bat Survey and
Red Squirrel Survey have been submitted to and approved in writing by the Planning Authority
in Consultation with the Biodiversity Officer.  Such details shall include when the surveys are to
be carried out, the methodology to be employed in both surveys and any mitigation measures,
including a timetable for the implementation of mitigation measures. 
Reason:  To prevent the disturbance of Protected Species. 
Note to Applicant 
Regard should be had to the Council’s Biodiversity Officers consultation comments in relation
to the proposed development, details of which is available to view via the Public Access
section of the Council’s website. 
13. PPP – Peat Survey 
Pursuant to Condition 1- no development shall commence until full details of a Peat Survey
and Management Plan has been submitted to and approved in writing by the Planning
Authority in consultation with the Biodiversity Officer.  Such details shall provide details of the
depth of the peat deposit on site. 
Reason: In order to protect natural heritage assets. 
Note to Applicant: 
Should the survey determine the depth of peat to be in excess of 0.5 metres the applicant will
require to liaise with SEPA for advice on management. 
Regard should be had to the Council’s Biodiversity Officers consultation comments in relation
to the proposed development, details of which is available to view via the Public Access
section of the Council’s website. 
14. PPP – Open Space/Play Areas 
Pursuant to Condition 1 – no development shall commence until details for the provision and
maintenance of proposed areas of communal open space and equipped play area(s) within the
development have been submitted to and approved by the Planning Authority. The details shall
comprise: 
i) A plan showing the location and extent of communal open space and equipped play areas;
ii) Provision to satisfy the minimum standards set out in the Development Plan; 6sqm of
equipped play space and 12sqm of informal open space per dwelling unit;
Page 21

Page 22

iii) Specification of play equipment to be installed, including surface treatments and any
means of enclosure, designed in accordance with the provisions of BS5696 (Play
Equipment Intended for Permanent Installation Outdoors);
iv) Proposals for the timing of the implementation of the play area(s) in relation to the phasing
of the development;
v) A maintenance schedule for communal open spaces and equipped play areas in
accordance with the provisions of BS5696 including details of on-going inspection,
recording and procedures for detailing with defects. 
The communal open space and equipped play area(s) shall be provided in accordance with
the duly approved details and shall be retained and maintained to the specified standards
thereafter. 
Reason: In order to secure provision of communal open space and equipped play areas within
the development in accordance with the minimum standards set out in the Development Plan. 
15. PPP – Core Path 
Pursuant to Condition 1 – no development shall commence until details for the provision of the
Core Path through the development site has been submitted to and approved by the Planning
Authority in consultation with the Access Officer. 
The details shall comprise: 
i) The route a minimum width of 2.5 metres wide;
ii) The route finished in a tarmacadam surface;
iii) The route provided with dropped kerbs where it meets the road surface;
iv) Gradients kept to a minimum to ensure the route is accessible for people of all abilities. 
The route shall be provided in accordance with the duly approved details and maintained to the
specified standards thereafter. 
Reason:  In order to secure the retention of the existing core path in the interests of amenity 
Note to Applicant: 
The advice contained in the consultation response from the Council’s Access Officer in relation
to application 18/02720/PPP, available to view via the Public Access section of the Council’s
website, should be fully considered in the preparation of the details for the provision of the
Core Path within the development. 
(Reference: Report by Head of Development and Economic Growth dated 8 December
2023, submitted) 
Page 22

Page 23

7. THE SCOTTISH GOVERNMENT ON BEHALF OF BLARGHOUR WIND FARM
LIMITED: ELECTRICITY ACT SECTION 36C AND ELECTRICITY GENERATING
STATIONS (APPLICATIONS FOR VARIATION OF CONSENT) (SCOTLAND)
REGULATIONS CONSULTATION FROM THE ENERGY CONSENTS UNIT FOR
PROPOSED VARIATION TO BLARGHOUR WIND FARM (CONSENTED 29
OCTOBER 2021).  THE S36C VARIATION PROPOSES TO VARY THE S36
CONSENT FROM 17 WIND TURBINES, 136.5M IN HEIGHT TO BLADE TIP TO
14 WIND TURBINES, 180M IN HEIGHT TO BLADE TIP: LAND
APPROXIMATELY 7KM NORTH WEST OF INVERARAY AND 4.5KM SOUTH OF
PORTSONACHAN (REF: 23/00537/S36) 
The Senior Planning Officer spoke to the terms of the report and to supplementary report
number 1 which provided further comment from the Applicant in relation to ornithology.   
Consideration was given to a recommended response to the Scottish Government’s
Energy Consents and Deployment Unit consultation on the Section 36C Variation
Application to the Section 36 consent granted on 29 October 2021 to construct and
operate Blarghour Wind Farm. 
The reports presented reviewed the policy considerations which were relevant to this
proposal and the planning merits of the development, the views of bodies consulted by the
Scottish Government, along with other consultations undertaken by the Council, and third
party opinion expressed to the Scottish Government following publicity of the application
by them. 
It was recommended that the Energy Consents Unit be notified that the Council does not
object to this Section 36C consultation subject to conditions detailed in supplementary
report number 1. 
Motion 
To agree to the recommendation in the report. 
Moved by Councillor Gordon Blair, seconded by Councillor John Armour. 
Amendment 
That the Committee agree - 
1. to the recommendation in the report; and 
2. to request that Officers ensure that concerns expressed by Members during this
meeting are passed on to the Energy Consents Unit. 
Moved by Councillor Kieron Green, seconded by Councillor Mark Irvine. 
A vote was taken by calling the roll. 
Motion    Amendment 
Councillor Armour   Councillor Brown
Councillor Blair   Councillor Green
Councillor Kennedy   Councillor A Hampsey
Page 23

Page 24

Councillor D Hampsey     
Councillor Hardie     
Councillor Irvine     
Councillor McCabe     
Councillor Martin     
Councillor Philand     
Councillor Wallace 
The Amendment was carried by 10 votes to 3 and the Committee resolved according. 
Decision 
The Committee agreed:- 
1. that the Energy Consents Unit be notified accordingly that: 
• Argyll and Bute Council DOES NOT OBJECT to this application, subject to the
inclusion of the conditions recommended by consultees in any consent granted by
the ECU. These should also include the condition proposed by the Applicant to
allow the lighting scheme to be revisited in the future to take account of emerging
technological solutions which would reduce the impacts of visible lighting, such as
transponder radar activated lighting; and 
2. to request that Officers that ensure that concerns expressed by Members during this
meeting are passed on to the Energy Consents Unit. 
(Reference: Report by Head of Development and Economic Growth dated 20 December
2023 and supplementary report number 1 dated 19 December 2023, submitted) 
The Chair ruled, and the Committee agreed, to take a short break at this point. 
The Committee reconvened at 1.15 pm with all those present as per the sederunt with the
exception of Councillor Paul Kennedy and Councillor Luna Martin. 
8. MR THOMAS IRWIN: FORMATION OF EARTHBANK SLURRY LAGOON AND
ASSOCIATED WORKS: LAND AT WEST DRUMLEMBLE FARM, WEST OF
ROWAN TREE COTTAGE, DRUMLEMBLE, CAMPBELTOWN (REF:
23/01018/PP) 
Before proceeding with his presentation the Area Team Leader advised of a late
representation received from Mr Tommy Millar, who had previously submitted an objection
to this application.   It was the view of Officers that the matters raised had been addressed
in the report of handing which had been before the Members at their meeting in November
2023. 
The Area Team Leader then spoke to the terms of supplementary report number 1 which
provided Members with an update following their decision on 22 November 2023 to
continue the application in order to allow submission of further information from the
Applicant.  The Applicant submitted the requested information which included: a health
and safety management plan for the site; revised site plan with tyre ladder details; revised
cross-section plan; revised security steel mesh fence details to include 2 strands of
barbed wire at the top and bottom; and Health and Safety Executive information sheet on
managing slurry on farms.
Page 24

Page 25

It was recommended that planning permission be granted subject to the revised list of
conditions and reasons detailed in supplementary report number 1. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 19.05.2023 supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title.  Plan Ref. No.  Version  Date Received 
Location Plans/Site Layout Plans  PL-001  A  30.05.2023 
Proposed Site Layout Plan  PL-002   D 06.12.2023 
Security Fence Details  PL-004  A 06.12.2023 
Cross Sections through proposed
slurry lagoon 
PL-003  C 06.12.2023 
Topographic Survey   01    22.09.2023 
Odour Management Plan       22.09.2023 
Health and Safety Management Plan   06.12.2023 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. Notwithstanding the effect of Condition 1, the developer shall secure the
implementation of an archaeological watching brief, to be carried out by an
archaeological organisation acceptable to the Planning Authority, during all ground
disturbance. The retained archaeological organisation shall be afforded access at all
reasonable times and allowed to record, recover and report items of interest and finds.
A method statement for the watching brief will be submitted by the applicant, agreed by
the West of Scotland Archaeology Service, and approved by the Planning Authority
prior to commencement of the watching brief. The name of the archaeological
organisation retained by the developer shall be given to the Planning Authority and to
the West of Scotland Archaeology Service in writing not less than 14 days before
development commences. 
Reason: In order to protect archaeological resources.   
3. Notwithstanding the effect of Condition 1, upon completion of works the development
hereby approved shall not be brought into use until the applicant has submitted to the
Page 25

Page 26

planning authority written confirmation from SEPA to confirm that the proposed
development complies with the relevant provisions of The Water Environment
(Controlled Activities)(Scotland) Regulations 2011 (as amended).    
Reason:  In order to safeguard amenity and the environment. 
4. No development shall commence until a scheme of boundary treatment, surface
treatment and landscaping has been submitted to and approved in writing by the
Planning Authority. The scheme shall include details of: 
i) Any proposed re-contouring of the site by means of existing and proposed
ground levels; 
ii) Proposed hard and soft landscape works; 
iii) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits
will be maintained for the lifetime of the development. 
The development shall not be operated until such time as the surface treatment and
any re-contouring works have been completed in accordance with the duly approved
scheme. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme during the first planting season following the commencement of the
development, unless otherwise agreed in writing by the Planning Authority. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity, and to comply with the requirements of NPF4 Policy 3. 
5. The proposed development hereby approved shall be operated in accordance with the
submitted Odour Management Plan dated September 2023, unless otherwise agreed
in writing by the planning authority. 
Reason: In the interests of amenity and safety. 
6. Notwithstanding the effect of Condition 1, the proposed safety signage shall be
installed on all elevations of the fences and on all access gates to the site including on
the two security fence gates as recommended on the revised site layout plan with
drawing no. PL-002  Rev D. Thereafter the signage shall be maintained to ensure that
it remains legible. 
Reason: In the interests of safety. 
7. The development hereby approved shall be operated in accordance with the submitted
Health and Safety Management Plan submitted to the Planning Authority on 06
December 2023, unless otherwise agreed in writing by the planning authority; or as
may otherwise be alternatively instructed by any other Agency with a statutory remit
limiting the operation or maintenance of the site, including the Health and Safety
Executive and/or SEPA. 
Reason: In the interests of amenity and safety.
Page 26

Page 27

(Reference: Report by Head of Development and Economic Growth dated 10 November
2023 and Supplementary Report Number 1 dated 8 December 2023, submitted) 
Councillor Luna Martin returned to the meeting during consideration of the foregoing item. 
9. BEAM SUNTORY LTD: PROPOSAL OF APPLICATION NOTICE FOR
HARVESTING OF PEAT MOSS FOR USE IN MALT WHISKY PRODUCTION
AND RESTORATION OF PREVIOUSLY DRAINED SITES: GLENMACHRIE
PEAT MOSS, PORT ELLEN, ISLE OF ISLAY (REF: 23/01984/PAN) 
The Senior Planning Officer spoke to the terms of the report.  The proposed peat
extraction area is located to the south of the settlements of Glenmachrie and Glenegedale
on the western side of the Isle of Islay.  The site area consists of open peat mossland and
is partly dissected by the A846 which runs north to south. The site contains four bodies of
water, three to the eastern side of the A846 and another on the western side. 
In terms of the adopted Local Development Plan (2015), the site is located within a
Countryside Zone and borders some areas of the Rural Opportunity Zone to the south. To
the north of the site is Loch Eighinn which is a designated Local Nature Conservation Site. 
The Laggan Bay coastal areas some 0.5km to the west of the proposed site are also
designated as Special Protection Areas (SPA) and SSSI. The site is also subject to the
following constraints: Surface and Riparian Flooding (REF: SEPA Flood Maps) (Parts of
the site appear to be within 1:200 riparian flooding zones), Deep Peat and Safeguarding
Zone 15 - Islay Airport (HIAL).   
The PAN describes the proposed development as “the harvesting of peat for use in the
production of malt whisky in a manner that causes the least environmental impact,
together with restoration of previously drained and worked areas within the site”. 
The report sets out the information submitted to date as part of the PAN and summarises
the policy considerations, against which any future planning application will be considered
as well as potential material considerations and key issues based upon the information
received to date.   
It was recommended that Members note the content of the report and submissions and
provide such feedback as they consider appropriate in respect of the PAN to allow these
matters to be considered by the Applicant in finalising any future planning application
submission. 
Decision 
The Committee noted the content of the report and requested that a step by step guidance
note outlining the technical aspects of the extraction and restoration process alongside
information on supply and demand of peat be submitted with the Planning Application. 
(Reference: Report by Head of Development and Economic Growth dated 1 December
2023, submitted) 
Page 27

Page 28

10. ARDALLA ESTATES LTD: PROPOSAL OF APPLICATION NOTICE FOR
HARVESTING OF PEAT MOSS FOR USE IN MALT WHISKY PRODUCTION
AND RESTORATION OF PREVIOUSLY DRAINED SITES: BALLIVICAR PEAT
MOSS, PORT ELLEN, ISLE OF ISLAY (REF: 23/01985/PAN) 
The Senior Planning Officer spoke to the terms of the report.  The proposed peat
extraction area is located to the immediate north of Port Ellen and bound to the east by
the A846. The irregular shaped site extends approximately 3 kilometres to the north
before extending eastwards into the southeastern quarter of Loch Nan Gabhar and
eastwards again to the track serving to Kintra Farm. 
In term of the current adopted Local Development Plan (2015), the site is located within a
designated Countryside Area, with some pockets of Rural Opportunity Area contained
within it. The site is located approximately 1km to the west of the Laggan Bay Special
Protection Area and SSSI. Port Ellen to the south of the site is designated as a main
settlement area and contains the main town centre and Established Business and Industry
Area. The site is also subject to the following known constraints: Surface and Riparian
Flooding (REF: SEPA Flood Maps) (Parts of the site appear to be within 1:200 riparian
flooding zones); Deep Peat (Dystrophic Blanket Peat Av depth 5.7m);
and Safeguarding Zone 15 - Islay Airport (HIAL). 
The PAN describes the proposed development as “the harvesting of peat for use in the
production of malt whisky in a manner that causes the least environmental impact,
together with restoration of previously drained and worked areas within the site”. 
The report sets out the information submitted to date as part of the PAN and summarises
the policy considerations, against which any future planning application will be considered
as well as potential material considerations and key issues based upon the information
received to date.   
It was recommended that Members note the content of the report and submissions and
provide such feedback as they consider appropriate in respect of the PAN to allow these
matters to be considered by the Applicant in finalising any future planning application
submission. 
Decision 
The Committee noted the content of the report and requested that a step by step guidance
note outlining the technical aspects of the extraction and restoration process alongside
information on supply and demand of peat be submitted with the Planning Application. 
(Reference: Report by Head of Development and Economic Growth dated 1 December
2023, submitted) 
11. DEVELOPMENT MANAGEMENT PERFORMANCE UPDATE - FQ2 2023/24 
A report providing an update on the performance of the Development Management
Service for the reporting period FQ2 2023/24 was considered. 
Decision 
The Committee agreed to note the content of the report. 
Page 28

Page 29

(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 7 December 2023, submitted) 
12. PLANNING PERFORMANCE FRAMEWORK 2022/23 
A report containing recent feedback form the Scottish Government in relation to the
Council’s Planning Performance Framework (PPF) for 2022/23 was considered. 
Decision 
The Committee agreed to note the content of the report and publicise the positive
feedback from the Scottish Government. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 8 December 2023, submitted) 
13. UPDATE ON RECENT SCOTTISH GOVERNMENT PLANNING APPEAL
DECISIONS 
A report summarising recent decisions by Scottish Minsters in respect of planning
application reference 19/01858/PP called in for determination, and the outcome of an
appeal against refusal of an application for listed building consent reference 22/01847/LIB,
was before the Committee for information. 
Decision 
The Committee noted the contents of the report. 
(Reference: Report by Head of Development and Economic Growth dated 20 December
2023, submitted) 
14. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: TAXI AND PRIVATE HIRE CAR
SURVEY 
A report updating Members on the timescale for submitting the taxi survey report was
before the Committee for information. 
Decision 
The Committee noted the updated position. 
(Reference: Report by Executive Director with responsibility for Legal and Regulatory
Support dated 20 December 2023, submitted) 
Page 29

Page 30

This page is intentionally left blank

Page 31

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE
held BY MICROSOFT TEAMS on TUESDAY, 16 JANUARY 2024 
Present: Councillor Amanda Hampsey (Chair) 
Councillor John Armour
Councillor Kieron Green
Councillor Graham Hardie
Councillor Mark Irvine 
Councillor Liz McCabe
Councillor Dougie Philand
Councillor Peter Wallace 
Attending: Stuart McLean, Committee Manager
Fiona Macdonald, Solicitor
James Crawford, Licensing Standards Officer
Pamela Fraser, Licensing Team Leader
Stuart Munro, Applicant’s Agent
Elizabeth McAlpine, Applicant’s Agent
Sergeant David Holmes, Police Scotland 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Jan Brown, Audrey Forrest, Daniel
Hampsey and Andrew Kain. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
The Committee resolved in terms of Section 50(A)(4) of the Local Government (Scotland)
Act 1973 to exclude the press and public for the following item of business on the grounds
that it was likely to involve the disclosure of exempt information as defined in Paragraphs
3 and 14 of Part 1 of Schedule 7A to the Local Government (Scotland) Act 1973. 
3. CIVIC GOVERNMENT (SCOTLAND) ACT 1982, THE CIVIC GOVERNMENT
(SCOTLAND) ACT 1982 (LICENSING OF SHORT-TERM LETS) ORDER 2022:
APPLICATION FOR GRANT OF A SHORT-TERM LET LICENCE 
The Chair welcomed everyone to the meeting.  In line with recent legislation for Civic
Government Hearings, the parties (and any representatives) were given the options for
participating in the meeting today.  The options available were by video call, by audio call
or by written submission.  For this hearing the Applicant’s Agents opted to proceed by way
of video call and Stuart Munro and Elizabeth McAlpine joined the meeting by MS Teams. 
Police Scotland also opted to proceed by way of video call and Sergeant David Holmes
joined the meeting by MS Teams. 
The Chair invited the Licensing Standards Officer to speak to the terms of the report. 
Thereafter the procedure set out in Appendix 6 of the report was followed and she invited
the Applicant’s Agent to speak on behalf of the Applicant. 
Page 31 Agenda Item 3b

Page 32

APPLICANT’S AGENT 
Stuart Munro, on behalf of the Applicant, spoke in support of the application. 
QUESTIONS FROM POLICE 
Sergeant Holmes was given the opportunity to asking the Applicant’s Agent questions and
he advised that he had no questions. 
POLICE SCOTLAND 
Sergeant Holmes read out the contents of a letter from the Divisional Commander dated
31 October 2023. 
QUESTIONS FROM APPLICANT’S AGENT 
Mr Munro took the opportunity to ask Sergeant Holmes questions. 
MEMBERS’ QUESTIONS 
The Members took the opportunity to ask the Applicant’s Agent and Police Scotland a
number of questions. 
SUMMING UP 
Police Scotland 
Sergeant Holmes was given the opportunity to sum up and he advised that he had nothing
further to add. 
Applicant’s Agent 
Mr Munro summed up on behalf of the Applicant 
When asked, both parties confirmed that they had received a fair hearing. 
DEBATE 
The Members debated the application before them. 
DECISION 
The Committee unanimously agreed to grant a Short-term Let Licence to the Applicant
subject to the following conditions while the court case has still to be determined: 
1. The Applicant will not be present in or around the licensed properties when they are
being let out. 
2. Bookings may not be made by anyone under the age of 18 years. 
3. The Applicant should have no remote access to any CCTV at the licensed properties. 
Page 32

Page 33

It was noted that the Applicant would receive written confirmation of this within 7 days. 
(Reference: Report by Regulatory Services and Building Standards Manager, submitted)
Page 33

Page 34

This page is intentionally left blank

Page 35

ARGYLL AND BUTE COUNCIL  PLANNING, PROTECTIVE SERVICES   
AND LICENSING COMMITTEE                                      
LEGAL AND REGULATORY SUPPORT  24 January 2024 
CIVIC GOVERNMENT (SCOTLAND) ACT 1982 
TAXI SURVEY 
1.0 EXECUTIVE SUMMARY 
1.1      The purpose of this report is to provide information to members to enable them 
to consider whether they wish to commission a further survey in relation to
whether there is unmet demand for taxis  within the local authority area. 
2.0 RECOMMENDATIONS 
2.1  Members are asked to note the contents of this report. 
2.2  Members are asked to consider whether they wish to (a) commission a new
taxi survey to ascertain whether there is currently any significant unmet
demand for taxis or (b) continue to have regard to the existing Taxi Surveys at
hearings for taxi operator licences, and consider at a later date whether new
reports are required where circumstances have changed to a material degree.
2.3      Members are asked to agree that no further survey be carried out in respect                     
of private hire cars at this time as the last surveys concluded that there was   
not an over provision of private hire cars as a whole. 
Page 35 Agenda Item 4

Page 36

ARGYLL AND BUTE COUNCIL  PLANNING, PROTECTIVE SERVICES   
AND LICENSING COMMITTEE                                      
LEGAL AND REGULATORY SUPPORT  24 January 2024 
CIVIC GOVERNMENT (SCOTLAND) ACT 1982 
TAXI  CAR SURVEY 
3.0 INTRODUCTION 
3.1 The purpose of this report is to ask members whether they wish to commission
a further survey in relation to whether there is unmet demand for taxis within the
local authority area.   
4.0 RECOMMENDATIONS 
4.1 Members are asked to note the contents of this report. 
4.2 Members are asked to consider whether they wish to (a) commission a new taxi
survey to ascertain whether there is currently any significant unmet demand for
taxis or (b) continue to have regard to the existing Taxi Surveys at hearings for
taxi operator licences, and consider at a later date whether new reports are
required where circumstances have changed to a material degree.
4.3 Members are asked to agree that no further survey be carried out in respect                     
of private hire cars at this time as the last surveys concluded that there was   
not an over provision of private hire cars as a whole. 
5.0 DETAILS 
5.1 Section 10(3) of the Civic Government (Scotland) Act 1982 deals with taxi
licences and provides that the grant of a taxi licence may be refused by a
licensing authority for the purpose of limiting the number of taxis in respect of
which licences are granted if, but only if, they are satisfied that there is no
significant demand for the services of taxis in their area which is unmet. 
5.2 In carrying out this test to ascertain whether there is significant unmet demand
in respect to the Bute and Cowal, Helensburgh and Lomond, Oban, Lorn and
the Isles and Mid Argyll, Kintyre and Islay areas, the Planning, Protective
Services and Licensing Committee currently refer to surveys carried out in 2019 
in relation to those respective taxi zones.
Page 36

Page 37

5.3  Members at their meeting on 18th October 2023 requested that Officers 
investigate whether or not it would be appropriate at this time to refresh the
2019 survey and bring back a report to the Committee before the end of the
year to advise on the outcome of this investigation.
5.4 The Scottish Government in the most recent edition of their best practice
guidance for local licensing authorities and taxi and private hire car operators
on the licensing of taxis and private hire cars and their drivers issued on 31st
May 2023 states the legal provision on quantity restrictions for taxis is set out in
section 10(3) of the 1982 Act. This provides that:
…the grant of a taxi licence may be refused by a licensing authority for the purpose of
limiting the number of taxis in respect of which licences are granted by them if, but only if,
they are satisfied that there is no significant demand for the services of taxis in their area
which is unmet.
5.53 Local licensing authorities will be aware that, in the event of a challenge to a decision to
refuse a licence, the licensing authority concerned would be required to establish to the
satisfaction of the court that it had first satisfied itself that there was no such significant
unmet demand.
5.54 The Scottish Government is of the view that decisions as to the case for limiting taxi
licences should remain a matter for licensing authorities in the light of local circumstances.
Licensing authorities that presently restrict numbers of taxi licences are, however,
encouraged to periodically review this policy and to examine the wider policy direction.
5.55 Licensing authorities in reviewing their policy with regard to quantity restrictions on taxi
licences should consider whether any restriction presently in place should continue. The
matter should be approached in terms of the interests of taxi users. What benefit is achieved
for them by the continuation of controls and how might they benefit if the controls were
removed? Is there evidence that removal of the controls would result in a clear and
unambiguous deterioration in the amount or quality of taxi service provision? Authorities in
assessing the case for quantity restrictions will wish also to have regard to the availability of
an appropriate supply of accessible vehicles within the hire car fleet such as to meet the
needs of passengers with a disability.
5.57 The Scottish Government agrees that the question of the restriction of licences should
be left to the discretion of licensing authorities. However, there is a need for review of the
frequency and component parts of the surveys used by licensing authorities to measure
unmet demand. In regard to frequency, licensing authorities should carry out a survey
sufficiently frequently to be able to respond to any challenge to the satisfaction of a court.
The English guidance issued in 2010 refers to their policy being reviewed every 3 years. 
5.5 Since publication of the respective surveys, carried out in 2019 there have not
been any significant changes to circumstances, population or taxi numbers in
any of the taxi zones.  The numbers of licences held in each area and the
number held at the commission of the survey in 2019 are as follows:-
Page 37

Page 38

2023 Figures     2019 Figures 
Oban, Lorn and the Isles – 48  Oban, Lorn and the Isles - 52 
Bute & Cowal – 54    Bute & Cowal - 57
Helensburgh & Lomond – 51  Helensburgh & Lomond - 48
Mid Argyll, Kintyre & Islay – 22  Mid Argyll, Kintyre & Islay - 23 
TOTAL = 175    TOTAL = 180 
There were 5 more licensed taxis in 2019 than at present. 
The variation in population recorded in the 2019 surveys (NRS 2017 Mid-Year
Estimates) compared to the most up to date information is as follows:- 
2021 Figures    2019 Figures
Oban, Lorn and the Isles -  20,008 Oban, Lorn and the Isles – 19,996
Bute & Cowal – 20,346   Bute & Cowal – 20,473 
Helensburgh & Lomond - 25, 834            Helensburgh & Lomond – 26,164
Mid Argyll, Kintyre & Islay – 20,032  Mid Argyll, Kintyre & Islay – 20,177
TOTAL = 86,220    TOTAL = 86,810 
5.6 Members are requested to consider whether, in the current circumstances they
wish to commission a further survey in relation to whether there is unmet
demand for taxis within the local authority area. 
5.7 It is not proposed that a further survey be carried out in respect of private hire
cars as the last surveys concluded that there was not an over provision of
private hire cars as a whole. 
6. CONCLUSION 
6.1  As the current survey is now 4 years old members may wish to consider
commissioning a further survey / or members may wish to continue to have
regard to the existing Taxi Surveys at hearings for taxi operator licences, and
consider at a later date whether new reports are required at such a time where
circumstances have changed to a material degree. 
7. IMPLICATIONS 
7.1  Policy - No changes are proposed at this time. 
7.2 Financial - The Council will need to fund the cost of a further survey. 
Page 38

Page 39

7.3 Legal - The Council require to comply with the terms of the Civic Government     
(Scotland) Act 1982. 
7.4 HR – None 
7.5. Fairer Scotland Duty: 
7.5.1  Equalities – Protected Characteristics - None 
7.5.2  Socio Economic Duty - None 
7.5.3  Islands – None 
7.6 Risks - There is a risk of challenge to any decision in relation to the granting 
of taxi licences. 
7.7 Customer Service – None 
7.8 Climate Change - None 
Douglas Hendry, Executive Director with responsibility for Legal and
Regulatory Support 
Policy Lead:   Councillor Kieron Green 
12th December 2023                                                  
For further information contact: Sheila MacFadyen, telephone 01546 604265. 
Page 39

Page 40

This page is intentionally left blank

Page 41

ARGYLL AND BUTE COUNCIL PLANNING, PROTECTIVE
SERVICES AND LICENSING
COMMITTEE
LEGAL AND REGULATORY
SUPPORT
24 JANUARY 2024 
CIVIC GOVERNMENT (SCOTLAND) ACT 1982 - LICENSING FEES IN
PREPARATION FOR LICENCE RENEWALS 
1. EXECUTIVE SUMMARY 
1.1 The purpose of this report is to update members on preparations for
the renewal of licences granted under the Civic Government
(Scotland) Act 1982, as well as inviting members to approve the
revision of the respective fees and conditions which apply to these
licences. 
2. RECOMMENDATIONS 
2.1 PPSL Members are asked to note and approve the contents of this
report. 
2.2 PPSL Members are asked to recommend to Council that fees for all
Civic Government licences be increased as detailed in Appendix 1. 
2.3 PPSL Members are asked to recommend to Council that licences
currently subject to a fixed three year period and due for renewal in
June 2024 continue to be granted on that basis. 
Page 41 Agenda Item 5

Page 42

1.     SUMMARY 
1.1 The purpose of this report is to advise members on various
issues in relation to Civic Government Licensing. 
1.2 Section 12 of the Civic Government (Scotland) Act 1982 provides
that the Council must seek to ensure that fees it charges in
respect of taxi and private hire car licences and applications are
sufficient to meet the expenses it incurs in carrying out its
functions in relation to those licences. Paragraph 15 of Schedule
1 to the 1982 Act also seeks to ensure that all fees received are
sufficient to meet the Council’s expenses incurred in exercising
their business under Part 1, Part 2 and Schedule 1 of the 1982
Act. Members are now invited to consider the issue of licence
fees in anticipation of the new three year renewal period
beginning in June 2024. 
1.3 The majority of licences (approximately 500) fall due for renewal
at the end of June 2024. This report details the position in relation
to the renewals of those licences. 
2.     RECOMMENDATIONS 
2.1 PPSL Members are asked to note and approve to note the
contents of this report. 
2.2 PPSL Members are asked to recommend to Council that fees for
all Civic Government licences be increased as detailed in
Appendix 1. 
2.3 PPSL Members are asked to recommend to Council that licences
currently subject to a fixed three year period and due for renewal
in June 2024 continue to be granted on that basis. 
3.  LICENSING FEES 
3.1 At the meeting of the PPSL Committee on 21st March 2018, it was
agreed that licences continue to be granted for a three year period
for the licences due for renewal in June 2018. It is proposed that
this continues in line with ongoing three yearly renewals.
ARGYLL AND BUTE COUNCIL PLANNING, PROTECTIVE
SERVICES AND LICENSING
COMMITTEE
LEGAL AND REGULATORY
SUPPORT
24 JANUARY 2024 
CIVIC GOVERNMENT (SCOTLAND) ACT 1982 - LICENSING FEES IN
PREPARATION FOR LICENCE RENEWALS 
Page 42

Page 43

3.2 As the June 2024 renewal period is approaching, a proposed list
of fees are contained in Appendix 1. These proposed new fees
represent a 5 to 6.91% year on year increase in line with salary
increases from 2021 on all of the fees currently charged. This
increase is proposed as Civic Government Licensing Fees have
not risen since June 2021, and any new fees will be set until June
2027. A review of the net cost of the licensing function has also
confirmed that the increase is required to ensure this element is
cost neutral. Members are invited to approve the proposed list of
new fees. 
3.3 It should be noted that taxi driver licences, private hire car driver
licenses, booking office licenses and skin piercing and tattoo
operator licenses do not fall within the fixed three year renewal
period but are granted for a period of three years from the date of
grant of the licence. 
4.  PREPARATION FOR LICENCE RENEWALS 
4.1 It is proposed that reminder letters will be issued to all licence
holders once the application fees have been confirmed. Licence
holders will be asked to lodge their applications for renewal as
soon as possible. A copy of the reminder letter is attached as
Appendix 2. Applications will be dealt with in the order that they
are received. 
4.2 Applicants will be advised of the provisions of Paragraph 8 of
Schedule 1 to the 1982 Act which provides that if an application is
made for the renewal of a licence before its expiry, the existing
licence shall continue to have effect until the application for
renewal has been determined. 
4.3 Consultation will take place with Police Scotland and
Environmental Services in relation to the renewal process. 
4.4 Members should note that it is intended to utilise staff who have
had previous experience of Civic Government Licensing to assist
in the renewal process. 
4.5 Applications for renewal of licences are not advertised at the Area
Offices. There is still however the 28 day period where
objections/representations can be lodged and no application for
renewal can be granted prior to the expiry of that period. Therefore,
if an application for renewal is received on the 30th June 2024, the
earliest possible date that it can be dealt with is 29th July 2024 if all
the paperwork has been provided by the applicant, no
objections/representations have been made and all relevant
responses have been received. 
4.6 All applications are inserted in a register which is available online
for public inspection. By virtue of Paragraph 14 of Schedule 1 to
the 1982 Act, the Licensing Authority requires to keep a register of
Page 43

Page 44

all applicants for licences under the Act. It also requires that as
soon as reasonably practicable after the receipt of each
application, details of such receipt and details of the final decision
of each application may be entered into the register. 
4.7 The register must include a note of the type and terms of each
licence granted by the Licensing Authority; and a note of any
suspension, variation of terms or surrender of a licence. 
4.8 The register requires to be open for public inspection at such
reasonable times and places as may be determined by the
Licensing Authority. The register for Argyll and Bute has been
maintained online since 1st April 2015. 
4.9 The application forms for all Civic Government licences will also be
amended to include a statement which advises the applicant of the
Council’s participation in the National Fraud Initiative and that
information about licences granted will be shared with other
agencies for the purpose of preventing fraud. 
4.10 Furthermore, the privacy statement on all application forms has
been reviewed and revised by Council officers in light of the new
General Data Protection Regulation (GDPR) regulations. 
5.  CONCLUSIONS 
5.1 Once the new licensing fees have been approved the renewal
notices will be issued. 
5.2 Continuing with the three year renewal period is fair to all licence
holders. Issuing reminder letters to current licence holders advising
of the status of their existing licence during the period their
application is being dealt with will clarify the position. 
6.  IMPLICATIONS 
6.1 
6.2 
6.3 
6.4 
6.5. 
Policy: No changes are proposed at this time. 
Financial: Financial implication are set out in the report. 
Legal: The Council will require to implement any
legislative changes set out in the report as and
when they come into force. 
HR: None. 
Fairer
Scotland
Duty: 
6.5.1  Equalities: None. 
6.5.2  Socio-economic duty: None.
Page 44

Page 45

6.6 
6.7 
6.8 
6.5.3  Islands: None. 
Risk: 
Climate 
Change:
None 
None 
Customer
Service:
None. 
APPENDICES 
1. List of Proposed Changes to Licence Fees 
2. Standard Letter to Licence Holders for Licence Renewals 
Executive Director: Douglas Hendry, with responsibility for Legal &
Regulatory Support 
Policy Lead: Councillor Kieron Green 
David Logan 
Head of Legal & Regulatory Support
6th December 2023 
For further information contact:  Margaret Moncur 
Appendix 1 – List of Proposed Fees from 1 April 2024 
Appendix 2 -  Reminder Letter 
Page 45

Page 46

This page is intentionally left blank

Page 47

APPENDIX 1 – from 1st April 2024 
LIST OF PROPOSED FEES 
TYPE OF LICENCE EXISTING  PROPOSED
1 Second Hand Dealer (3 Years) £452 £533
2 Second Hand Motor Dealer (3 Years) £524 £617
3 Metal Dealer/Itinerant Metal Dealer     
Permanent (3 Years) £524 £617   
Temporary exemption warrant £149 £176
4 Street Trader     
Commercial (3 Years) £275 £324   
Volunteer/Charity (1 year licence) £90 £107
5 Market Operator       
Commercial (3 Years) £524 £617   
Temporary (voluntary/charitable organisation holding one event per
year) £173 £205
6 Public Entertainment       
Permanent (3 Years) £524 £617   
Temporary (1 year licence) £149 £176
7 Late Hours Catering (3 Years) £524 £617
8 Window Cleaner (3 Years) £275 £324
9 Boat Hirer (3 Years) £275 £324
10 Taxi Operator (3 Years) £452 £533
11 Private Hire Car Operator (3 Years) £452 £533
12 Taxi Driver (3 years from date issued) £113 £133
13 Private Hire Car Driver (3 years from date issued) £113 £133
14 Booking Office (3 years from date issued) £125 £147
15 Knife Dealer (3 Years) £524 £617
16 Skin Piercing & Tattoo Operator (3 years from date issued)       
(Premises occupied by Licensee) £311 £368   
(Premises under control of others) £250 £295
17 Temporary Exemption Warrant (Metal Dealer) £149 £175
18 Amendment to Licence £77 £91
19 Substitution of Taxi/Private Hire Licence       
(Processed within 5 working days) £66 £78   
(Processed same day) £90 £107
20 Certified Copy Licence £41 £48
21 Re-Issue of a Plate £41 £48
22 Re-Issue of a Badge £41 £48
23 Extract of Civic Government Register £36 £43
24 Copy of Civic Government Register (per licence type) £90 £107
25 Vehicle inspection fee (per inspection note 50% surcharge will be applied
for re-inspection/appointment no show ) £80 £95
26 Vehicle inspection surcharge (Covid 19 defog process) DELETED NO
LONGER REQUIRED £12.50 N/A 
Page 47

Page 48

This page is intentionally left blank

Page 49

Argyll and Bute Council  
Comhairle Earra Ghàidheal agus Bhòid 
Executive Director:  Douglas Hendry 
Dear Sir/Madam, 
CIVIC GOVERNMENT (SCOTLAND) ACT 1982 – RENEWAL OF A LICENCE 
I note from my records that your licence is due for renewal on 30 June 2024. I therefore enclose the
appropriate application form. Please arrange for the completed form, with the necessary supporting
documents and the application fee to be returned prior to 30 June 2024. This can be done in the
following ways: 
1. By post to the Licensing Section, Legal & Regulatory Support, Argyll & Bute Council, Kilmory,
Lochgilphead, PA31 8RT. 
2. In person at any one of the following offices (opening hours Monday to Friday 9am to 12pm): 
Burnet Building, St John Street, Campbeltown  
Ellis Lodge, 5 Argyll Road, Dunoon  
Helensburgh & Lomond Civic Centre, 38 East Clyde Street, Helensburgh  
Kilmory, Lochgilphead  
Municipal Buildings, Albany Street, Oban  
37 Victoria Street, Rothesay  
Breadalbane Street, Tobermory, Isle of Mull  
Tiree Business Centre, Crossapol, Isle of Tiree  
Islay Servicepoint, Jamieson Street, Bowmore, Islay 
3. By submitting your application online. This can be done by visiting the Council’s website at
www.argyll-bute.gov.uk and going to the ‘Law and Licensing’ section. Please note, that in the
case of online submissions, some supporting documentation can be uploaded. 
Licensees are asked to lodge applications as soon as possible to assist with the efficient processing of
applications. 
I would advise that in terms of the Civic Government (Scotland) Act 1982, provided an application for
renewal of a licence is made before it expires, the existing licence continues to have effect until the 
Legal & Regulatory Support
Kilmory, Lochgilphead PA31 8RT
Tel: 01546 604128   Fax: 01546 604373
DX No: 599700 LOCHGILPHEAD
e-mail: licensing@argyll-bute.gov.uk
Website: www.argyll-bute.gov.uk 
Our Ref: [XXXX]
Date: [as postmark]
Appendix 2 Page 49

Page 50

licence is renewed or granted or an appeal against the refusal of the application has been either
abandoned or determined. 
I would also advise that all competent applications will take a minimum of 35 days to process from
submission as there is a 28 day period in terms of the 1982 Act during which objections or
representations may be made, and during which no application can therefore be granted.
Any application received after 30 June 2023 cannot be dealt with by way of renewal unless good cause
is shown in which case a licensing authority may deem an application made up to 28 days after the
expiry date of the licence to be an application made before the expiry of said licence. It is likely that good
cause could only arise in circumstances which were beyond the control of the applicant. 
I would advise that you require to display the enclosed notice duly completed for a period of 21
days from the date that you submit your application to the Council at or near the premises/site so
that it can be conveniently read by the public. Once the notice has been displayed for the 21 days
you must complete the enclosed Certificate of Compliance and return it to the Licensing Section.
Please note that your application cannot be finally dealt with until this certificate has been
received. 
If you have any queries in relation to the renewal process please email licensing@argyll-bute.gov.uk or
phone 01546 604128. 
I look forward to receiving your application and would thank you in advance for your assistance in
lodging your application as early as possible. 
Yours faithfully, 
DAVID LOGAN
Head of Legal & Regulatory Support
Page 50

Page 51

ARGYLL AND BUTE COUNCIL  PLANNING, PROTECTIVE SERVICES AND
LICENSING COMMITTEE
DEVELOPMENT AND ECONOMIC GROWTH   24th January 2024 
OBAN AND HELENSBURGH STRATEGIC DEVELOPMENT FRAMEWORKS 
1.0 EXECUTIVE SUMMARY 
1.1 The Argyll and Bute Outcome Improvement Plan and LDP2 aim to reverse population
decline and promote economically driven growth across Argyll and Bute.
Notwithstanding many strengths and opportunities throughout Argyll and Bute, the
only two areas that can potentially deliver and sustain growth of any significant size,
particularly in terms of population are Oban and its hinterland, and Helensburgh &
Lomond. 
1.2 Oban is a Main Town within the Tobermory to Dalmally Growth Corridor having a
range of facilities, services and shops that support a strong hinterland including a
number of Key Rural Settlements. However, it is becoming increasingly physically
constrained and nearing its topographical capacity for growth
1.3 Helensburgh and Lomond enjoys proximity and connectivity with the central belt
and the development of HMNB Clyde is increasing the naval staff by 1700 and their
families, and brings further associated civilian population.  However growth of the
area is restricted by the Green Belt designation which was designed to contain the
settlements.
1.4 To achieve strategic growth within both these areas; LDP2 identifies commitments to
produce Strategic Development Frameworks which will plan for future development
over a 20-40 year time period.  Production of these is a complex task, but is essential
to delivering planned infrastructure investment, land release, and the resultant
growth.  It will also be a key part of addressing the housing emergency.
1.5 The report outlines the preliminary progress to date in developing the Frameworks,
and that a resource request is being made to Policy and Resource Committee to
drive forward these tasks.  Officers will report future progress regularly to PPSL, and
will engage with all Members at appropriate stages of the process. 
1.6 RECOMMENDATIONS 
It is recommended that PPSL
1: note the contents of the paper,
Page 51 Agenda Item 6

Page 52

2: endorse the resource requests to be made to Policy and Resources Committee to
assist in driving forward the Strategic Development Frameworks. 
Page 52

Page 53

ARGYLL AND BUTE COUNCIL  PLANNING, PROTECTIVE SERVICES AND
LICENSING COMMITTEE
DEVELOPMENT AND ECONOMIC GROWTH   24th January 2024 
OBAN AND HELENSBURGH STRATEGIC DEVELOPMENT FRAMEWORKS 
2.0 INTRODUCTION 
2.1 Two areas within Argyll and Bute that can potentially deliver and sustain growth of
any significant size, particularly in terms of population are Oban and its hinterland,
and Helensburgh & Lomond.  LDP2 identifies commitments to produce Strategic
Development Frameworks for both these areas.  This paper updates the committee
on progress to achieving this. 
3.0 RECOMMENDATIONS 
3.1 It is recommended that PPSL
1: note the contents of the paper,
2: endorse the resource requests to be made to Policy and Resources Committee to
assist in driving forward the Strategic Development Frameworks.
4.0 DETAIL 
4.1 The overall objective of the Argyll and Bute Outcome Improvement Plan is that Argyll and
Bute’s economic success is built on a growing population.  LDP2 sets out a spatial strategy
which supports this objective and seeks to reverse population decline and promote
economically driven growth across Argyll and Bute. 
4.2 Notwithstanding many strengths and opportunities throughout Argyll and Bute, the
only two areas that can potentially deliver and sustain growth of any significant size,
particularly in terms of population are Oban and its hinterland, and Helensburgh &
Lomond. 
Oban
4.3 Local Development Plan 2 identifies the position of Oban as a Main Town within the
Tobermory to Dalmally Growth Corridor highlighting its range of facilities, services
and shops that support a strong hinterland including a number of Key Rural
Settlements. However, it also sets out that the town is becoming increasingly
physically constrained and nearing its topographical capacity for growth. LDP2
Page 53

Page 54

identifies that growth could potentially be achieved through rationalisation and
restructuring within the town as well as within the wider Growth Corridor through
significant investment in road infrastructure and a partnership approach across a
range of stakeholders.
4.4 National Planning Framework 4 (NPF4) recognises the role of the Growth Corridor in
identifying areas for future growth and identifies the role Oban plays in providing
lifeline links to the islands as well as services to its wider hinterlands. It recognises its
position as a developing university town with the European Marine Science Park
providing local economic and educational opportunities. Also recognised are
opportunities for new infrastructure and repurposing of land to help shift industrial
activity towards supporting the off shore renewable sector as well as the
connectivity role played by the airport and opportunities there for investment in
compliance operations and future drone technology. 
Helensburgh
4.5 Local Development Plan 2 identifies Helensburgh and Lomond as a growth area in
the spatial strategy. It identifies the development of HMNB Clyde as the UK’s single
submarine base and resultant increase in around 1700 naval staff and their families
as well as the associated opportunities in civilian construction projects and supply
chain, servicing and support businesses. LDP2 also identifies the proximity and
connectivity of the area to Glasgow and the central belt coupled with its high quality
environment as an attractive location for commuters and growth in tourism.
4.6 However, it also recognises that opportunities for sustainable growth are potentially
limited by the green belt which was established to contain the expansion of
settlements and retain their landscape setting and that it is anticipated that the
green belt will come under pressure in the future as the population and employment
opportunities increase.
4.7 LDP2 sets out that whilst an immediate review of the green belt is not required, due
to there being sufficient development identified within the plan, there is a need to
consider how Helensburgh and Lomond can develop over a 20-40 year period in
order to plan for investment and infrastructure considered alongside the need to
review the green belt. 
Strategic Development Frameworks
4.8 To achieve strategic growth within both these areas; LDP2 identifies commitments to
produce strategic development frameworks for each as below:
LDP2 Proposal A – Oban Strategic Development Framework (OSDF)
“The Council will take forward a Strategic Development Framework for the wider
Oban area working with stakeholders including communities, key agencies,
infrastructure providers, landowners, the Scottish Government, housing associations
Page 54

Page 55

and the private sector to deliver a co-ordinated approach to: the rationalisation of
existing land uses, improved traffic management and parking (including potential for
park and ride), identification of new development opportunities for housing and
economic uses, development of the Strategic Transport Hub, investigation of
development potential and improvements to network resilience associated with the
strategic road and rail network, including the possibility of the Oban Development
Road and the consented Dunbeg Half-Way Roundabout, in order to realise the full
potential of this strategically important area.” 
LDP2 Proposal B – Helensburgh Strategic Development Framework (HSDF)
“Argyll and Bute Council propose to carry out a review of the Helensburgh and
Lomond Green Belt boundaries through a Strategic Development Framework, to
provide a framework for the provision of infrastructure and future development,
whilst recognising and safeguarding the key environmental features of the Green
Belt, the landscape setting of settlements forming part of the Cardross – Helensburgh
– Garelochhead corridor, and the contribution which the green network around these
communities can make to providing for sustainable development.”
4.9 This ‘Strategic Development Framework’ approach is recognised as an appropriate
way to promote long term growth by the LDP2 Scottish Government Reporters and
NPF4 now also reflects this approach supporting planned population growth in a
growth corridor from Tobermory to Oban and on to Dalmally and a general
infrastructure first approach. 
4.10 The two Strategic Development Frameworks will be crucial bedrocks for LDP3 and
will be required to feed in to the Evidence Report which will be part on the new style
process for LDP production. 
4.11 Although long term, both frameworks are key to addressing the housing emergency,
as they are the only things that can lead to planned housing development at scale. 
Both areas are the places of greatest housing demand, and there are likely to be
pressures on the supply of housing land within the medium term. 
4.12 Draft and preliminary scoping work has already started and is ongoing. Initial analysis
of housing needs and demand assessment has been carried out to generate different
growth scenarios for the period of consideration.  A desk top land scoping exercise
has been carried out to identify theoretical growth areas which will require
assessment.  An initial identification of known constraints and characteristics has
been initiated.   This work is in draft and high level to date. 
Page 55

Page 56

OSDF Stage 1
Identification of broad areas of land 
Presentation of initial opportunities and constraints 
Engagement Stage 1
Key Agencies, infrastructure providers, Council officers, local Councillors, landowners, community
groups. 
OSDF Stage 2 
Identification and publication of preferred options for locations for long term strategic growth. 
Engagement Stage 2 
Public engagement - preferred options 
OSDF Stage 3
Consideration of all Stage 1 & 2 engagement responses.
Selection and publication of identified option(s) as final OSDF
Identification of related wider actions and opportunities.
Publication of Action Programme. 
Page 56

Page 57

4.13 Production of the Strategic Development Frameworks is a complex tax, and will
predominantly need to adhere to a land use planning structure, as indicated in the
table above, supported by necessary transport and landscape assessment, with an
iterative process of site identification, consultation, refinement of proposals and
solutions, and further identification. Ultimately a settled proposal will need further
consultation, support of the Council, and assessment by Scottish Government,
before it can be incorporated into the next LDP3. In addition delivery will need to be
considered and the OSDF & HSDF should be accompanied by an action programme
for delivery which might include: land acquisition, further ground investigation,
funding identification, more detailed masterplanning, etc... 
4.14 In terms of timescale, there is an immediate priority to develop this work even
though the outcomes identified will be delivered in the medium term. Ultimately, for
the OSDF & HSDF to have maximum influence and leverage on investment, it will be
necessary for it to be incorporated into the next LDP which will be LDP3. The aim
would be to adopt LDP3 within five years. Adequate resourcing of the OSDF & HSDF
will be of significant importance to delivering within this timescale. Subject to more
detailed project scoping and planning, it is estimated that if fully funded with
consultancy support it would be possible to produce the OSDF & HSDF in a 2-3 year
time frame.  A separate report is being presented to Policy and Resources
Committee to request funding from the Council’s Priorities Budget.  Officers will
report progress regularly to PPSL, and will engage with all Members at appropriate
stages of the process. 
OTHER AREAS
4.15 It is important to note that whilst this report focuses on Oban and Helensburgh,
LDP2 provides a comprehensive growth and development strategy for the whole of
Argyll and Bute, focusing growth where possible on the Main Towns of
Campbeltown, Dunoon, Helensburgh, Lochgilphead, Oban and Rothesay.  The plan
also seeks to deliver a more flexible approach to development within the
Countryside where appropriate.  Additional but smaller Strategic Development
Frameworks are identified for Bowmore and Tobermory.  Strategic Masterplan Areas
are identified in Inveraray, Lochgilphead, Tobermory and Port Ellen.  Areas for Action
promoting regeneration include Rothesay, Dunoon, Port Bannatyne and Tarbert. 
5.0 CONCLUSION
5.1 LDP2 identifies Oban and Helensburgh as the centre of two areas with greatest potential
to deliver growth at a strategic scale which will help to reverse population decline.  To
deliver this LDP2 identifies the need to produce Strategic Development Frameworks for
both areas.  Theses Frameworks will underpin the identification and release of land and
infrastructure, and will form the bedrock of LDP3.  Moreover they will be key elements
to addressing the recently identified Housing emergency in the medium term. 
Production of these Frameworks is a priority for the Council, and funding to resource this
is being requested at the Policy and resources Committee.
Page 57

Page 58

6.0 IMPLICATIONS
6.1 Policy – None as a result of this paper 
6.2 Financial – A linked paper making a request for resourcing is being taken to P&R
Committee requesting funds from the Council’s Priorities Fund. 
6.3  Legal – None as a result of this paper. 
6.4  HR - None
6.5  Fairer Scotland Duty: 
6.5.1   Equalities - protected characteristics - None 
6.5.2   Socio-economic Duty - None 
6.5.3  Islands - None
6.6 Climate Change – None  
6.7 Risk – None at this moment 
6.8  Customer Service - None 
Kirsty Flanagan,
Executive Director with responsibility for Development and Economic Growth
Policy Lead Cllr Green
24th January 2024                                                 
For further information contact: 
Matt Mulderrig matt.mulderrig@argyll-bute.gov.uk
Page 58