North Lanarkshire Council Report Housing Committee Does this report require to be approved? ☒ Yes ☐ No Ref TM/KD Date 15/02/23 Future New Build Sites From Pamela Humphries, Chief Officer of Place E-mail divink@northlan.gov.uk Telephone Kevin Divin, Project Development Co-ordinator 07583 089 510 Executive Summary The council has an approved target to deliver 5,000 new affordable rented homes by 2035. To date 970 new build houses have been completed with a further 421 homes under construction. To ensure an adequate supply of sites for the new build programme, potential council owned sites continue to be evaluated for their suitability for inclusion within the programme. The sites outlined within this report have been assessed and are recommended for inclusion within the new-build programme subject to the conclusion of detailed ground investigations, full title checks and appropriate statutory consents. Recommendations It is recommended that the Committee: 1) Approves the inclusion of the proposed sites, as outlined in section 2.1 and Appendix 2 of this report, within the new-build programme. 2) Approves the potential off the shelf purchase of completed homes at Prospecthill Road, Ravenscraig; Torrance Park, Newarthill and Springhill Road, Shotts as outlined in section 2.3 The Plan for North Lanarkshire Priority Improve economic opportunities and outcomes Ambition statement (1) Ensure a housing mix that supports social inclusion and economic growth
Page 2
1. Background 1.1 The council has an approved target to deliver 5,000 new homes by 2035, which although predominantly new build homes also includes properties purchased through the council’s Buy Back Schemes. To date, 970 new build homes have been completed, with a further 421 homes under construction. In addition, 606 homes have been purchased through the Buy Back schemes as at 9th January 2023. A summary of progress with the new build programme is attached at Appendix 1 . 2. Report 2.1 To ensure an adequate supply of sites for the new build programme, potential sites continue to be evaluated for their suitability for inclusion within the programme. The sites outlined below have been identified and are recommended for inclusion within the new-build programme subject to the conclusion of detailed ground investigations, full title checks and relevant statutory consents. It is proposed that development be considered at the following sites: • Dalzell Drive, Motherwell (former Taggarts Car Sales, Windmillhill Street) – approximately 24 units (subject to the council concluding purchase of site) • Former Thornlie Church Hall Site, Caledonian Road, Wishaw – approximately 6 units 2.2 The proposed project at the former Thornlie Church Hall Site, Caledonian Road, Wishaw is a priority town centre sites which support delivery of the Town Visions as part of the council’s commitment to town centre regeneration. This project is at an early stage of design development / feasibility. 2.3 It is also proposed to progress the potential ‘off the shelf’ purchase at the following locations: • 23 new homes (4 x 2apt/2p Cottage Flat, 4 x 3apt/4p Cottage Flat, 10 x 3apt/4p Terraced House, 5 x 4apt/6p Terraced House) at Prospecthill Road, Ravenscraig from O’Brien Properties Limited • 6 new homes (6 x 3 bed 5p terraced houses to be purchased as agreed at Finance and Resources Committee on 30 November 2022) – plus potential purchase of up to 8 more homes at Torrance Park, Newarthill from Barratt Homes • Approximately 22 new homes (houses) over several phases at Springhill Road, Shotts from Keepmoat The acquisition price will be subject to future reports to Finance and Resources Committee. 2.4 Site location plans are included for each of these sites within Appendix 2 to this report. 2.5 Consultation with local elected members and North Lanarkshire Federation of Tenants and Residents Associations has been undertaken for both the new build and proposed off the shelf acquisitions and no objections to these sites have been received.
Page 3
3. Measures of success 3.1 The success of the council’s new supply programme is measured in terms of: • Achievement of target completions of 5,000 completions by 2035. • Delivery of projects within budget. • Quality of housing delivered. 4. Supporting documentation Appendix 1 Summary of New Build programme Appendix 2 Site Locations Pamela Humphries Chief Officer of Place
Page 4
5. Impacts ( http://connect/report-template-guidance ) 5.1 Public Sector Equality Duty and Fairer Scotland Duty Does the report contain information that has an impact as a result of the Public Sector Equality Duty and/or Fairer Scotland Duty? Yes ☒ No ☐ If Yes, please provide a brief summary of the impact? The new build programme includes measures that will help reduce inequalities of outcome through certain design features including: • Housing for Varying Needs to make homes as accessible as possible; • Secure by Design to make homes and the surrounding environment as safe and secure as possible. • Achieving the Scottish Government requirements for Greener Homes to • reduce the incidence of fuel Poverty. • Facilitating improved access to high speed internet capabilities including installation of ‘fibre to the property’. The above features are also part of the specification requirement for off the shelf properties. If Yes, has an assessment been carried out and published on the council’s website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality- and-fairer-scotland-duty-impact-assessments Yes ☒ No ☐ 5.2 Financial impact Does the report contain any financial impacts? Yes ☒ No ☐ If Yes, have all relevant financial impacts have been discussed and agreed with Finance? Yes ☒ No ☐ If Yes, please provide a brief summary of the impact? The cost of constructing or purchasing these homes will be contained within the overall budget for the new build programme within the Housing Revenue Account. There is a grant from the Scottish Government towards the cost of the new homes which is from a minimum of £71,500 per unit 5.3 HR policy impact Does the report contain any HR policy or procedure impacts? Yes ☐ No ☒ If Yes, have all relevant HR impacts have been discussed and agreed with People Resources? Yes ☐ No ☐ If Yes, please provide a brief summary of the impact? 5.4 Legal impact Does the report contain any legal impacts (such as general legal matters, statutory considerations (including employment law considerations), or new legislation)? Yes ☐ No ☒ If Yes, have all relevant legal impacts have been discussed and agreed with Legal and Democratic?
Page 5
Yes ☐ No ☐ If Yes, please provide a brief summary of the impact? 5.5 Data protection impact Does the report / project / practice contain or involve the processing of personal data? Yes ☐ No ☒ If Yes, is the processing of this personal data likely to result in a high risk to the data subject? Yes ☐ No ☒ If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e- mailed to dataprotection@northlan.gov.uk Yes ☐ No ☐ 5.6 Technology / Digital impact Does the report contain information that has an impact on either technology, digital transformation, service redesign / business change processes, data management, or connectivity / broadband / Wi-Fi? Yes ☒ No ☒ If Yes, please provide a brief summary of the impact? There are no direct Technology/Digital impacts directly arising from this report. The scope of the new homes includes Cat5e cabling to support home networking and Fibre to the Premises (FTTP) for digital connectivity as part of the ‘future-proofing’ of North Lanarkshire Council’s new housing stock. This is also part of the specification requirement for off the shelf properties. Where the impact identifies a requirement for significant technology change, has an assessment been carried out (or is scheduled to be carried out) by the Enterprise Architecture Governance Group (EAGG)? Yes ☐ No ☒ 5.7 Environmental / Carbon impact Does the report / project / practice contain information that has an impact on any environmental or carbon matters? Yes ☒ No ☐ If Yes, please provide a brief summary of the impact? Intrusive ground investigations will be undertaken as part of the due diligence associated with determining the suitability of sites for development. This is undertaken in liaison with North Lanarkshire Council’s Environmental Health (Pollution Control) to ensure that appropriate investigations are undertaken. The new homes are built to higher energy efficiency and sustainability standards, which helps to reduce future carbon emissions from the properties. This is done via a fabric first approach to development, while incorporating renewable technologies where appropriate. The Council’s New Supply Programme will ensure that the impact on the Council’s carbon footprint is mitigated. The specifications incorporated within the contract documentation will: deliver reduced energy need; encourage sustainable construction; promote health and wellbeing; reduce waste and resources through effective storage, collection and composting of waste and recyclable materials and; include measures which will reduce CO2 emissions). For off the shelf purchases all such statutory consents would apply and other considerations are included in the
Page 6
negotiations including specification agreement between the Council and Developers prior to acquisition. 5.8 Communications impact Does the report contain any information that has an impact on the council’s communications activities? Yes ☐ No ☒ If Yes, please provide a brief summary of the impact? 5.9 Risk impact Is there a risk impact? Yes ☒ No ☐ If Yes, please provide a brief summary of the key risks and potential impacts, highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk Registers), and how they are managed? Risk associated with the New Supply Programme is managed within the Enterprise & Communities Resources Risk Register process. By undertaking detailed Ground Investigation and other relevant site assessments, prior to proceeding with the development of any particular site, the council is mitigating the risk of unforeseen costs relating to ground conditions, although this risk cannot be eliminated entirely. In the case of off the shelf purchases these risks are borne by the developer. . 5.10 Armed Forces Covenant Duty Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does it relate to healthcare, housing, or education services for in-Service or ex- Service personnel, or their families, or widow(er)s)? Yes ☐ No ☒ If Yes, please provide a brief summary of the provision which has been made to ensure there has been appropriate consideration of the particular needs of the Armed Forces community to make sure that they do not face disadvantage compared to other citizens in the provision of public services.
Page 7
Appendix 1 - New Build Sites Summary (as at 9th December 2022) Area Location Units Comments Completion Year Holytown Main St 10 Completed (Amenity) 2010/11 Holytown Spruce Way 10 Completed 2010/11 Motherwell Ravenscraig (David Wilson Homes) 18 Completed (off the shelf) 2010/11 Airdrie Clarkston PS 19 Completed 2011/12 Millerston Coshneuk Rd 11 Completed (Amenity) 2011/12 Cumbernauld North Rd 29 Completed 2011/12 Wishaw Cambusnethan PS 20 Completed (Amenity) 2011/12 Viewpark Laburnum Rd (Phase 1) 12 Completed 2012/13 Viewpark Laburnum Rd (Phase 2) 28 Completed 2013/14 Moodiesburn Gartferry Road 50 Completed 2013/14 Cumbernauld Westfield Drive 30 Completed 2013/14 Airdrie Former Albert PS 14 Completed 2014/15 Chryston Lanrig Rd 27 Completed (Amenity) 2014/15 Coatbridge Corsewall St 14 Completed 2014/15 Bellshill Former Belvidere PS 20 Completed 2015/16 Kilsyth Fisher Ave 30 Completed 2015/16 Chryston Old Lindsaybeg Rd (Persimmon) 14 Completed (off the shelf) 2015/16 Motherwell Glencairn Tower site 25 Completed 2016/17 Viewpark Former Tannochside PS 16 Completed 2017/18 Wishaw Walkerburn Dr, Coltness 20 Completed 2017/18 Cumbernauld Cardowan Drive 30 Completed 2017/18 Cumbernauld Kildrum Nursery 16 Completed 2017/18 Chryston Station Rd (Persimmon) 30 Completed (off the shelf) 2017/18 Chapelhall Former St Aloysius PS (Phase 1) 24 Completed 2017/18 Chapelhall Former St Aloysius PS (Phase 2) 6 Completed 2018/19 Cumbernauld Brown Road 20 Completed 2018/19 New Stevenston Former New Stevenston PS 15 Completed 2018/19 Chryston Greenlea Road 21 Completed 2018/19 Coatbridge Old School Court 20 Completed 2018/19 Airdrie Former Alexandra PS 14 Completed 2018/19 Harthill Former Harthill PS 20 Completed 2018/19 Motherwell Cleekhimmin, Ravenscraig (Barratt) 10 Completed (off the shelf) 2019/20 Coatbridge Blair Road 40 Completed 2019/20 Motherwell Calder PS 30 Completed 2019/20 Gartcosh Johnston Rd / Inchnock Ave (Bellway) 16 Completed (off the shelf) 2019/20
Page 8
Cumbernauld Cedar Road Nursery 14 Completed 2019/20 Chryston Main Street (Bellway) 18 Completed (off the shelf) 2019/20 Wishaw Meadowhead Rd, Ravenscraig (Keepmoat) 11 Completed (off the shelf) 2019/20 Bellshill Caledonian Avenue (Phase 1 ) 19 Completed 2020/21 Wishaw Dimsdale Road (Phase 1) 6 Completed 2020/21 Bellshill Caledonian Avenue (Phase 2) 8 Completed 2021/22 Wishaw Dimsdale Road (Further Phases) 55 Completed 2021/22 Coatbridge St James PS / Lismore Drive 58 Completed 2021/22 Wishaw Roberts Street (Belhaven House) 16 Completed 2021/22 Wishaw Mossburn St, Waterloo 20 Completed 2022/23 Plains Plains PS 16 Completed 2022/23 Sub total 970 Completed Chryston Former Chilterns Care Home 21 On Site Airdrie Dykehead Road (Holehills) 150 On Site Airdrie Northburn Place 31 On Site Bellshill Community Road 29 On Site Airdrie Former Orrs Building (Wilson) 20 On Site Wishaw Castlehill Road, Gowkthrapple (Phase 1) 97 On Site Coatbridge Berwick St 19 On Site Stepps Gateside Farm (Barratt) 30 On Site Motherwell Former BRE, Ravenscliff Rd, Ravenscraig 24 On site Sub total 421 On site Coatbridge Columba High School 130 Design development underway Motherwell Mabel Street 20 Planning app approved Glenmavis McArthur Ave 21 Planning app approved Viewpark Laburnum Rd 26 Planning app approved Coatbridge Bank Street 9 Planning app approved Airdrie Glenacre Drive 16 Planning app approved Chapelhall Gibb Street 25 Planning app approved Wishaw Graham Street 13 Planning app submitted
Page 9
Coatbridge Kildonan Street 49 Design development underway Cumbernauld Former Cumbernauld Village PS 8 Planning app approved Glenboig Former Police Station, Main Street 7 Planning app approved Motherwell Brandon Street 48 Planning app approved Wishaw King Street 5 Planning app approved Wishaw Stewarton Street & Kings House 17 Design development underway Motherwell Former Motherwell Town Hall 20 Planning app approved Airdrie Calderigg Place 42 Design development underway Airdrie Former Petersburn PS 40 Planning app approved Millerston Coshneuk Road 16 Design development underway Wishaw Caledonian Road 9 Planning app submitted Coatbridge Mitchell Street 100 Approved at Committee - Aug 2022 Caldercruix Former St Mary's PS 25 Approved at Committee - Aug 2022 Bellshill Thorn Road 26 Approved at Committee - Aug 2022 Airdrie Airdriehill Road 75 Approved at Committee - Aug 2022 Motherwell Hope Street (Masonic Hall) 10 Approved at Committee - Aug 2022 Coatbridge Main Street 40 Approved at Committee - Aug 2022 Sub total 797 Design development underway Coatbridge Shawhead 111 Re-provisioning site Coatbridge Dunbeth 170 Re-provisioning site Motherwell Coursington 60 Re-provisioning site Sub total 341 Re-provisioning sites
Page 10
Cumbernauld Community Growth Area - Phases 1-3 (Bellway) 75 Off the shelf Planning app submitted Chryston Gartferry Road (Allanwater) 22 Off the shelf Purchase approved at Committee Coatbridge Lorne Place (Allanwater) 24 Off the shelf Purchase approved at Committee Moodiesburn Auchengeich, Gartferry Road (Bellway) 12 Off the shelf Purchase approved at Committee Cumbernauld Kingfisher, Dowanfield Road (Zoom) 24 Off the shelf Purchase approved at Committee Coatbridge Former DWP Offices, South Circular Road (ML5 Limited) 39 Off the shelf Purchase approved at Committee Gartcosh Johnston Rd - Phase 2 (Bellway) 12 Off the shelf Purchase approved at Committee Sub total 208 Future off the shelf purchases from developers Total 2737
Page 11
Appendix 2 - General Outline of Site Locations • Dalzell Motherwell – approximately 24 units: • Former Thornlie Church Hall Site, Caledonian Road, Wishaw – approximately 6 units:
Page 12
• Prospecthill Road, Ravenscraig – 23 units.
Page 13
• Torrance Park, Newarthill – Up to 14 units
Page 14
• Springhill Road, Shotts from Keepmoat – Approximately 22 units over several phases