Agenda pack

North Lanarkshire Council · 15 February 2023
Back to Housing Committee — 15 February 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Our Ref:
Your Ref:
Contact:
Tel:
Fax:
E-Mail:
Date: 
Lesley Dysart 
dysartl@northlan.gov.uk 
6 Feb 2023 
Members of the
Housing Committee     
Chief Executive’s Office
Archie Aitken
Chief Officer of Legal & Democratic
Civic Centre, Windmillhill Street
Motherwell ML1 1AB
DX 571701, Motherwell 2
www.northlanarkshire.gov.uk      
Notice is given that a Meeting of the HOUSING COMMITTEE is to be held in the Council Chamber,
Civic Centre, Motherwell on Wednesday, 15 February 2023 at 10a.m. which you are requested to
attend. 
The agenda of business is attached.    
Chief Officer of Legal and Democratic 
Members :     Councillors: H Brannan-McVey, G Brennan, B Burgess, T Carragher, M Coyle,
D Crichton, P Di Mascio, H Dunbar, T Fisher, F Fotheringham,  M Hughes, J Jones,
D Johnston, J Keltie, J Leckie, G Lennon, J Logue, F MacGregor, M McBride,
B McCluskey, B McCulloch, M McCulloch, P McDade, F McKay, R McKendrick,
C McManus, F McNally, M McPake, J McPhilemy, A McVey, L Mitchell, P Patton,
L Nolan, J Reddin, G Robinson, A Smith, A Stubbs, R Sullivan, J Toner, and G Woods. 
Page 1 of 221

Page 2

Page 2 of 221

Page 3

AGENDA
(1) Declarations of Interest in terms of the Ethical Standards in Public Life Etc. (Scotland) Act
2000
OPERATIONAL
(2) Mears LLP: Operational and Financial Performance Monitoring Report (page 7 - 26)
Submit report by the Chief Officer of Housing Property Services setting out Mears Limited
Liability Partnership (LLP) performance against its business objectives, Council priorities and
the Housing and Corporate Repairs and Maintenance service delivery contracts and the
financial performance years 2022 and 2023 (copy herewith)
(3) Saltire Partnership  Performance Report (page 27 - 36)
Submit report by the Chief Officer of Housing Property Services providing a detailed update on
the current 2022/23 performance of the Business Housing Property Central Heating Repairs &
Maintenance service delivery contracts (copy herewith)
(4) Local Housing Strategy Annual Progress Review (page 37 - 82)
Submit report by the Chief Officer of Housing Management setting out progress in delivering
the strategic priorities and actions set out in the Local Housing Strategy 2021-2026 (copy of
report herewith, and Presentation to Committee by the Chief Officer of Housing Management)
(copy herewith)
(5) Rent Assistance Fund (page 83 - 88)
Submit report by the Chief Officer of Housing Management seeking approval to establish a
new fund to assist tenants who are falling into rent arrears due to the impact of the cost-of-
living crisis (copy herewith)
(6) Update on Open Market Purchase Scheme PO13(2) (page 89 - 96)
Submit report by the Chief Officer of Place providing an update on the progress of the Open
Market Purchase Scheme (copy herewith)
(7) New Housing Supply Programme - Procurement Report (page 97 - 106)
Submit report by the Chief Officer of Place (1) providing an update on current procurement
activity relating to the new build housing programme, and (2) seeking approval to progress
procurement arrangements as outlined in the report (copy herewith)
(8) Future New Build Sites (page 107 - 120)
Submit report by the Chief Officer of Place seeking approval of the potential to purchase off
the shelf completed homes at Prospecthill Road, Ravenscraig; Torrance Park, Newarthill, and
Springhill Road, Shotts (copy herewith)
Page 3 of 221

Page 4

2
FINANCIAL
(9) Former Tenants Arrears Write Off to 31 March 2021 (page 121 - 126)
Submit report by the Chief Officer of Housing Management seeking approval of the write off of
(1) £2,292,882.10 which includes individual debts greater than £500, and (2) credit balances
that have arisen in some former tenancy rent accounts, totalling £39,592.85 (copy herewith)
(10) Housing Revenue Account - 2023/24 Revenue Estimates (page 127 - 136)
Submit report by the Chief Officer of Finance presenting to Committee information that will
enable the Council to set its Housing Revenue Account (HRA) budget, and rent levels for
2023/24 (copy herewith)
MONITORING
(11) Revenue Budget Monitoring Reports
(a) HRA Revenue Monitoring Report (page 137 - 144)
Submit report by the Chief Officer of Housing Management providing a summary of the
Housing Revenue Account financial performance for the period from 1 April 22 to 6
January 23 (Period 10) (copy herewith)
(b) Enterprise and Communities - Revenue Monitoring Report (page 145 - 156)
Submit report by the Depute Chief Executive providing a summary of the financial
performance of the Enterprise and Communities Service for the period from 1 April 22
to 6 January 23 (copy herewith)
(12) Capital Programme Monitoring Reports
(a) HRA Capital Monitoring Report  - 1 April 22 to 6 January 23 (page 157 - 166)
Submit report by the Chief Officer of Housing Property Services reviewing progress
towards agreed spending plans within the 2022/23 HRA Capital Programmes (copy
herewith)
(b) Enterprise and Communities - Capital Monitoring (page 167 - 174)
Submit report by the Depute Chief Executive regarding the financial performance of
2022/23 Enterprise and Communities capital programme for the period from 1 April 22
to 6 January 23 (Period 10) (copy herewith)
CONTRACTS
(13) Contracts for Approval
(a) Provision of Domestic Flooring 2023 - 2027 (page 175 - 184)
Submit report by the Chief Officer of Housing Management seeking approval to award
the contract for the Provision of Domestic Flooring 2023 to Spruce Carpets Ltd (copy
herewith)
(b) Replacement of Windows and Doors (2023-2025) (page 185 - 194)
Submit report by the Chief Officer of Housing Property Services seeking approval to
award the contract for Replacement of Windows and Doors (2023-2025) for Lot 1 to
Walker Profiles Ltd, and for Lot 2 to Belac Group Limited (copy herewith)
Page 4 of 221

Page 5

3
(c) Measured Term Contract - Battery Storage and PV Panels (2023-2026)
(page 195 - 204)
Submit report by the Chief Officer of Housing Property Services seeking approval to
award the contract for the Measured Term Contract for Battery Storage and PV Panels
(2023-2026) to Saltire Facilities Management Ltd (copy herewith)
(14) Contract for Homologation - Garden Assistance Scheme 2023 - 2025 (Lot 1 - Mini-
Competition) (page 205 - 214)
Submit report by the Chief Officer of Housing Management seeking homologation to award a
call-Off contract for Garden Assistance Scheme (Lot 2) 2023-2025 to Id Verde Ltd (copy
herewith)
(15) Contracts awarded Below Committee Approval Threshold (page 215 - 222)
Submit report by the Chief Officer of Asset and Procurement informing of contracts awarded
between 1 October and 31 December 2022 (copy herewith)
EXCLUSION OF PUBLIC
The Committee is asked to consider passing the following resolution:
"That under Section 50A(4) of the Local Government (Scotland) Act 1973, the public be
excluded from the meeting for the following item of business on the grounds that it involves
the likely disclosure of exempt information as defined in paragraph 9 of Part 1 of Schedule 7A
of the Act."
(16) Housing and Property Services - Corporate Maintenance - Measured Term Contract Update,
Non-Housing Properties (page 223 - 228)
Submit report by the Chief Officer of Housing Property Services informing of the (1) current
position on a number of Measured Term Contracts (MTC's) utilised by Housing & Property
Services in relation to the council's non-housing property portfolio, and (2) current spend
levels on contracts that have expired, are about to expire and where appropriate, the interim
measures that are being put in place prior to these contracts being re-tendered (copy
herewith)
(17) Housing and Corporate Property Repairs and Maintenance Contracts - Update
(page 229 - 232)
Submit report by the Chief Officer of Housing Property Services informing that the service is
working within the upper limit of the Housing and Corporate Property Repairs and
Maintenance Contract, and not the annual extension limit as previously advised due to the
impact of inflation on the projections (copy herewith)
Page 5 of 221

Page 6

Page 6 of 221

Page 7

North Lanarkshire Council
Report
Housing Committee
Does this report require to be approved? ☐ Yes   ☒No
Ref  BL/MH/KD/HD Date 15/02/23
Mears LLP: Operational and Financial Performance Monitoring
Report to 30 November 2022
From  Brian Lafferty, Chief Officer, Housing Property Services
E-mail HendryM@northlan.gov.uk
DoohanK@northlan.gov.uk Telephone Michelle Hendry, 07960974797
Kevin Doohan, 07415477387 
1. Background 
1.1 In 2010 Morrisons Facilities Services Ltd successfully bid to become the Council’s
strategic partner to deliver housing and corporate repairs over a 10-year period with
the contract commencing on 21 January 2011. Mears PLC subsequently bought
Morrisons Facilities Services Ltd as a going concern, so now own the 67% shareholding
in the Mears Scotland LLP (Mears) strategic partnership and the inherent North
Lanarkshire service contract. North Lanarkshire Council owns the remaining 33% of
Mears Scotland LLP. 
Executive Summary
This report outlines Mears Limited Liability Partnership (LLP) performance against its
business objectives, Council priorities and the Housing and Corporate Repairs and
Maintenance service delivery contracts and the financial performance for financial years
2022 and 2023.
Recommendations 
It is recommended that committee: 
(i) Acknowledge Mears LLP’s operational performance for 2022/23 for both housing
repairs and corporate repairs, from 1 April 2022 to 30 November 2022. 
(ii) Acknowledge Mears financial performance as of 30 September 2022, along with
assurance, or otherwise of the financial standing of the ALEO by Financial Solutions. 
(iii) Acknowledge that the Head of Business Solutions submits a six-monthly composite
report to the Audit and Scrutiny Panel confirming that governance and risk
management arrangements are suitably robust within each ALEO/partner.
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition
statement
(1) Ensure a housing mix that supports social inclusion and economic
growth
AGENDA ITEM 2
Page 7 of 221

Page 8

1.2 At a strategic level, the MEARS Management Committee is responsible for governance
and oversight of the LLP’s statutory responsibilities in relation to service delivery and
management, staffing, financial control and reporting, health and safety, performance
monitoring and risk management. The Management Committee meets quarterly and
comprises up to four representatives from MEARS Scotland and two representatives
from North Lanarkshire Council with these positions currently filled by a Councillor and
the Chief Officer, Housing Management. Senior officers from both partners are also in
attendance to provide professional, technical and financial reports. 
1.3 The Council expected the partnership to secure local employment, source local
supplies and services, and ultimately secure continuous improvement in the repair’s
services delivered to North Lanarkshire residents and the council. 
1.4 The Year 8 Best Value Service Review (BVSR) of the MEARS contract, reported to the
Enterprise and Housing Committee in May 2018, included an assessment of the
corporate property repairs service including: Revenue Works Orders, capital projects,
Client-Contractor liaison arrangements; post-inspections; health and safety; and
performance reporting. The review found that works are carried out safely and are
conducted in accordance with the job specification, good industry practice and the
relevant quality standards. The opportunity was identified, however, to improve
feedback and ongoing communication between MEARS and the relevant Services to
ensure that the customer was kept up to date on the progress of the repairs. Overall,
the BVSR identified high levels of service delivery across the partnership, with only a
small number of improvement actions identified, including the need for improved
communications as referenced above. 
1.5 Housing repairs, corporate property maintenance and capital investment proposals are
all currently in-scope for delivery through the new North Lanarkshire Council Enterprise
Project. To ensure continuity of service and enable anticipated inclusion of housing and
corporate property maintenance within the North Lanarkshire Council Enterprise
Project, the Housing and Regeneration Committee at its meeting on 20 May 2020
considered a report recommending that provision is made for annual extensions to the
strategic partnership with MEARS, potentially up to January 2024. 
1.6 In relation to the contract extension, Mears are now in the second year, this
commenced on 22 January 2022 until 21 January 2023. It should also be noted that
the third year was approved at committee which is from 22 January 2023 to 21
January 2024. 
1.7 In line with the role and nature of the strategic partnership vehicle, performance will
continue to be reported to Committee during the extension periods. 
1.8 In February 2020, the arrangements were revised, and individual Chief Officer’s now
submit a six-monthly performance report to the relevant service committee confirming
that the ALEO is delivering services as per our recommendations and expectations,
and in accordance with the Service Level Agreement of contract works agreement.
Colleagues in Financial Solutions provide the financial performance information along
with assurance, or otherwise, in relation to the financial standing of the company. 
1.9 In addition to this reporting, the Chief Officer for Business Solutions submits a six-
monthly composite report to the Audit and Scrutiny Panel confirming that governance
and risk management arrangements are suitably robust within each ALEO. Information
is also provided by the Chief Officer of Financial Solutions relating to compliance with
Page 8 of 221

Page 9

financial monitoring arrangements and identifying any matters which may result in
financial risk to the council. This financial information is reported by exception. 
2. Report 
2.1 Performance Indicators 
2.1.1 It was agreed that performance against these targets should be reported to committee
on a six-monthly basis. As such a Partnership Performance report has been submitted
on a scheduled basis, with the most recent considered by the previous committee at
its meeting on 31 August 2022. 
2.1.2 Appendix 1 provides year to date housing performance in 2022/23 with comparison
figures from the previous year provided in Appendix 2. Emergency and non-emergency
timescales for housing repairs are shown in Appendix 3. Appendix 4 provides year to
date Corporate performance in 2022/23 with comparison figures from the previous year
provided in Appendix 5. Emergency and non-emergency timescales for corporate
repairs are shown in appendix 6.  Further performance outcomes, demonstrating where
Mears is supporting The Plan for North Lanarkshire are provided at Appendix 7.
Appendices 8 and 9 provide financial performance and overall Standing as of 30
September 2022. 
2.2 Housing Property Performance 
2.2.1 The timescale in completing emergency repairs for all 3 linked contractors, year to date,
is currently 3.23 hours. Mears year to date, average emergency timescales are 3.32
hours. The 2021/22 Scottish average was 4.20 hours. 
2.2.2 The timescale for completing non-emergency repairs, for all 3 linked contractors, year
to date, is currently 6.85 days. Mears average non-emergency timescales is 9.52 days. 
The 2021/2 Scottish average was 8.9 days. A full breakdown of year to date including
emergency and non-emergency performance for all contractors as well as Mears only,
is included in appendix 3. 
2.2.3 It should also be noted that repairs carried out right first time has been reported at 97.42
% over the same period. The 2021/2 Scottish average was 88.3% 
2.2.4 Current customer satisfaction level is 94.27% year to date. The 2021/22 Scottish
average was 88.0%. We continue to receive various methods of surveys which include
completed surveys online from tenants and at the post inspection stage of works,
undertaken by our Technical Officers. We also receive results from Mears text
message survey which was introduced January 2021. Customer satisfaction surveys
continue to inform action and help ensure that any areas of dissatisfaction are
immediately followed up. 
2.2.5 Frontline resolutions - The number of Stage 1 complaints received for 2022/23
relating to all of Housing Property and Projects, have increased in comparison with the
same period last year (see table 1 below).  Of the complaints responded to year to
date, a total of 67.68% have been upheld or partially upheld, in the same period last
year 65.77% were upheld. 92.42% of complaints YTD have been responded to within
SPSO timescales, in comparison to 98.66% of complaints in the same period in
2021/22. Forty six stage one complaints were received YTD in relation to Mears, they
were responded to within timescale and 42 (91.30%) were upheld or partially upheld.
Page 9 of 221

Page 10

An analysis of all complaints received is undertaken by Local Homes to allow any re-
occurring issues to be addressed and associated service improvement actions to be
progressed. 
2.2.6   Investigations- The number of Stage 2 complaints received for 2022/23, relating to all
Housing Property and Projects service, has decreased in comparison to the same
period last year (see table 1 below) A total of 57.14% of closed cases have been upheld
or partially upheld which is a decrease in comparison to 77.27% upheld or partially
upheld in the same period last year. 95.24% of complaints received as stage 2
complaints were responded to within SPSO timescale in comparison to 95.45% of
complaints in the same period in 2021/22.  There has been 6 stage 2 complaints
received in relation to Mears within 2022/23 to date. They were responded to within
timescales and 83.33% were upheld. 
2.2.7 It should be noted that in relation to the number of complaints as a comparison to the
number of emergency and non-emergency repairs, which equated to 72,234 from April
to Nov 2022 this equates 0.3 as a % of complaints as a comparison. 
2.2.8 Table 1 below shows Housing Property and Projects complaints received via 
Council between each financial year.   
Table 1 
2022/23 2021/22 (for comparison) 
Q1 Q2  Q3 Oct &
Nov only
Q4  Total Q1 Q2 Q3 Q4 Total
Stage 1 73 63 62  198 54 50 55 61 220
Stage 2 7 9 5  21 9 7 8 9 33 
Total 80 72 67  219 63 57 63 70 253 
2.3 Corporate Property Performance 
2.3.1 The timescale in completing emergency repairs year to date, April 2022 to November
2022 is currently 4.19 hours.   
2.3.2 The timescale for completing non-emergency repairs year to date is currently 8.47
days. A full breakdown of year to date, emergency and non-emergency performance is
included in appendix 4.  
2.3.3 98.15% of emergency jobs were completed within time scale YTD. This surpasses the
97% target.  
2.3.4 Also surpassing the 97% target is the percentage of routine jobs completed within
timescale which currently sit at 98.38% YTD. 
2.4 Service Delivery Highlights 
A sample of service delivery highlights over the period include: 
• Careers talks at Braidhurst High and Dalziel High schools in September
• Collaborative working with supply chain to donate paint to Mother & Baby unit in
Airdrie
• 22 New craft apprenticeships onboarded in Q2
Page 10 of 221

Page 11

• 3 Kickstart employees successfully secured apprenticeships with Mears
• 1 ‘No Limits’ placement secured employment with Mears upon successful
completion of 52 week placement 
2.5 Financial Impact – Public Accountability 
2.5.1 To satisfy the Council’s duty to ensure the organisation delivering property repairs and
upgrade services on its behalf is financially sound, the Council’s Section 95 Officer
maintains appropriate and proportionate processes and procedures for scrutinising
Mears financial performance. 
2.5.2 The Council’s Legal Agreements with Mears specify the financial information which it
must submit to the Council including an annual business plan, quarterly management
accounts, audited financial statements etc., to enable Financial Solutions to assess and
report any financial risk likely to arise as a result of the Council using Mears to deliver
these services. 
2.5.3 The Council expends both revenue and capital resources annually with Mears to deliver
services which assist the Council in achieving its priority outcomes. Mears operated a
financial year ending 31 December 2021 with the majority of its turnover anticipated
from housing and property repairs, with the remainder representing capital and other
works. 
Based on their audited accounts to 31 December 2021, members will wish to note that
Mears LLP reported a trading profit of £1.181m on an annual turnover of £48.856m
(2.4%).   
2.5.4 As previously advised, the contract with Mears includes scope for the Council to receive
additional financial benefits, all of which have been impacted during the year by the
restrictions in place including: 
a) A “volume discount”, which gives the Council a 6.28% return on the value of
relevant works awarded through the partnership. For the financial year 2022/23,
the Council had budgeted to receive £1.9m which is fully projected to be
achieved. 
b) The partnership agreement also makes provision for a Best Value Efficiency
Saving (BVES) to be applied to the schedule of rates paid by the Council on 1st
July each year.  The BVES receivable is dependent on turnover achieved by
Mears, with a rate of 2.75% applicable on works to the value of £30m, a further
4.69% applicable on works between £30m and £35m, and any turnover in excess
of £35m attracting additional BVES of 7.69%.  Recognising the Council’s 2022-
23 budget of £33.9m for housing repairs, the partnership expected to deliver a
minimum benefit of £0.825m. 
c) Scope also exists for the Council to receive dividends from this partnership
arrangement. However, as a result of the previous cumulative negative trading
position, there have been no dividends declared to date. 
d) In return for satisfactory service delivery and effective financial performance
through the LLP, Mears PLC is entitled to receive a management fee which
comprises both fixed and variable elements and is partially linked to the level of
works delivered through the contract. 
2.6 Financial Performance as of 30 September 2022
Page 11 of 221

Page 12

2.6.1  Mears Financial year runs from January to December. The LLP is budgeting to receive
a net profit of £1.833m on a turnover of £49.989m (3.7%).  The 2022 budget submission
was based upon normal trading forecasts following the conclusion of the defined
service agreement. The budget is based on the pre-defined service delivery run rates,
taking into consideration anticipated reductions in some planned work streams. Existing
agreements on Covid19 support are included in the first quarter to March 2022. 
2.6.2 The mix of turnover traded to November 2022 has had more of a bias towards routine
repairs than originally envisaged. Planned works have been re-prioritised to ensure the
routine works are being completed. The partnership was also heavily involved in the
Ukraine Towers Project which is about to conclude with the work mix returning to
expected levels. 
2.6.3 Based on Mears financial statements to 30 September 2022, it should note that the
company accounts are showing a net profit of £1.655m on a turnover of £41.993m
(3.94%). Details of performance against budget to 30 September 2022 are detailed in
Appendix 8. 
2.6.4 It should be noted that the partnership has experienced difficult trading conditions
during quarters 1-3. This is due to the challenging issues within the market, where
material prices are increasing and in instances difficult to procure. It should also be
noted that recruitment is proving challenging due to a demand on labour across the
construction industry. 
2.7  Overall Financial Standing – Balance Sheet as of 30 September 2022 
2.7.1 Appendix 9 provides key balances to give members an update on the overall financial
standing of the company. Key balances and indicators worthy of specific note include: 
a) The company had cumulative net assets of £2.260m 
b) A comparison of current assets to current liabilities equated to a current net
asset of £3.959m and a current ratio of 1.35. A current ratio less than 1 is an
indication that the company may experience difficulty in meeting its obligations.
The partnership ratio is above 1, however there is a continued reliance upon
the parent company’s rolling facility which is up to a maximum of £8.000m. 
c) The intra Group loan account stood at £1.731m on 30 September 2022. 
3. Measures of success 
3.1  These reports detail the activities which are expected to support delivery of the council’s
priority outcomes, as well as the organisation’s performance against these. This should
ensure elected members have sufficient information to assess how Mears’ service
delivery supports the council in delivering against The Plan for North Lanarkshire, as
well as producing a high level of service delivery, legal compliance and customer
satisfaction. 
4. Supporting documentation 
4.1  Appendix 1 – Mears Housing Performance 22/23 
4.2  Appendix 2 – Mears Housing Performance 21/22 
4.3  Appendix 3 – Housing emergency and non-emergency performance 22/23
Page 12 of 221

Page 13

4.4 Appendix 4 – Mears Corporate Performance 22/23
4.5 Appendix 5 – Mears Corporate Performance 21/22
4.6 Appendix 6 – Corporate emergency and non-emergency performance 22/23
4.7  Appendix 7 – Mears Contribution to The Plan
4.8 Appendix 8 - Financial Performance as of September 2022
4.9 Appendix 9 – Overall Financial Standing as of September 2022 
Brian Lafferty
Chief Officer, Housing Property Services 
Page 13 of 221

Page 14

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
There is a risk with market forces as outlined in section 2.6.4 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Page 14 of 221

Page 15

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g., Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10  Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes  ☐  No   ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 15 of 221

Page 16

Appendix 1 MEARS HOUSING PERFORMANCE 2022/23  
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
Cat 1a -
Emergency
within Hours
(95%)
Total
1024 1315 1173 1144 1420 1322 1498 1476        
%
Within
99.61% 99.54% 99.49% 99.83% 99.72% 99.92% 99.33% 99.12%        
Cat 1b -
Emergency
Outwith
Hours (95%)
Total
735 658 749 645 706 667 772 728        
%
Within
99.86% 99.70% 99.33% 99.69% 99.86% 99.85% 99.35% 99.31%        
Cat 2 -
Routine 3
Day Works
(95%)
Total
634 677 658 637 758 690 761 780        
%
Within
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%        
Cat 3 -
Routine 7
Day Works
(95%)
Total
1 1 2 3 3 1 3 4        
%
Within
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%        
Cat 4 -
Routine 20
Day Works
(95%)
Total
2283 2402 2544 2169 2578 2309 2128 2190        
%
Within
99.91% 99.71% 99.96% 99.95% 99.96% 99.96% 99.86% 100.00%        
Empty House
Works - 3
Days (95%)
Total
310 339 330 284 297 304 272 291        
%
Within
100.00% 95.87% 93.94% 98.59% 99.66% 100.00% 100.00% 100.00%        
Empty House
Works - 10
Days (95%)
Total
459 455 505 433 469 409 374 438        
%
Within
99.78% 94.95% 95.05% 98.61% 99.79% 100.00% 99.20% 100.00%        
Routine
Works - P9
(95%)
Total
3 0 0 1 2 2 1 3        
%
Within
100.00% N/A N/A 100.00% 100.00% 100.00% 100.00% 100.00%        
Glazing Pilot
Works (95%)
Total
112 141 96 115 143 176 108 116        
%
Within
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%        
Priority P -
Extended
Priorities
(95%)
Total
199 232 286 225 195 200 69 134        
%
Within
100.00% 100.00% 99.65% 100.00% 98.46% 100.00% 100.00% 100.00%        
Adaptations -
40 Days
(95%)
Total
70 99 104 70 77 82 84 80        
%
Within
100.00% 98.99% 100.00% 100.00% 100.00% 100.00% 100.00% 98.75%        
Rotworks -
40 Days
(95%)
Total
43 64 59 63 50 51 48 45        
%
Within
100.00% 100.00% 100.00% 100.00% 96.00% 98.04% 100.00% 100.00%        
Priority T - 1
Day  (100%) 
Total
246 294 199 211 254 309 356 397        
%
Within
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%         
Page 16 of 221

Page 17

Appendix 2 MEARS HOUSING PERFORMANCE 2021/22  
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
Cat 1a -
Emergency
within
Hours
(95%)
Total
1441 1491 1405 1391 1536 1539 1564 1536 1433 1301 1369 1419
%
Within
99.38% 99.46% 98.72% 99.21% 99.35% 99.03% 99.42% 98.83% 99.44% 99.69% 99.34% 99.37%
Cat 1b -
Emergency
Outwith
Hours
(95%)
Total
910 966 779 928 947 762 907 766 824 826 791 724
%
Within
99.78% 99.28% 99.61% 99.57% 99.37% 99.21% 99.67% 97.39% 99.51% 99.76% 99.12% 99.72%
Cat 2 -
Routine 3
Day Works
(95%)
Total
507 804 791 821 875 767 838 783 730 741 677 748
%
Within
99.61% 100.00% 100.00% 100.00% 99.89% 100.00% 99.76% 99.87% 99.86% 100.00% 100.00% 100.00%
Cat 3 -
Routine 7
Day Works
(95%)
Total
1 1 0 1 0 0 1 1 0 0 1 1
%
Within
100.00% 100.00% N/A 100.00% N/A N/A 100.00% 100.00% N/A N/A 100.00% 100.00%
Cat 4 -
Routine 20
Day Works
(95%)
Total
916 2491 2820 2145 2006 1905 1871 2360 1794 1853 1857 2149
%
Within
100.00% 100.00% 99.96% 99.77% 99.85% 100.00% 99.95% 99.92% 99.94% 99.78% 99.84% 99.95%
Empty
House
Works - 3
Days (95%)
Total
479 442 487 513 512 427 474 524 494 459 490 427
%
Within
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 99.79% 99.81% 100.00% 99.56% 99.80% 99.77%
Empty
House
Works - 10
Days (95%)
Total
500 448 503 491 476 578 498 548 478 467 541 434
%
Within
100.00% 100.00% 99.80% 99.80% 100.00% 100.00% 100.00% 99.64% 100.00% 99.79% 99.82% 99.54%
Routine
Works - P9
(95%)
Total
1 1 1 0 2 3 4 13 5 8 3 6
%
Within
100.00% 100.00% 100.00% N/A 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Glazing
Pilot Works
(95%)
Total
85 120 130 130 143 160 132 142 147 120 106 109
%
Within
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 99.08%
Priority P -
Extended
Priorities
(95%)
Total
154 154 232 349 527 599 671 836 291 192 195 189
%
Within
99.35% 100.00% 99.57% 99.71% 100.00% 100.00% 100.00% 99.88% 100.00% 100.00% 100.00% 100.00%
Adaptations
- 40 Days
(95%)
Total
92 66 124 91 78 121 106 97 37 93 55 107
%
Within
100.00% 100.00% 100.00% 98.90% 100.00% 99.17% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Rotworks -
40 Days
(95%)
Total
41 62 80 57 61 39 65 57 53 54 66 56
%
Within
97.56% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Priority T -
1 Day 
(100%) 
Total
387 307 280 283 341 391 355 394 414 411 324 314
%
Within
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 
Page 17 of 221

Page 18

Appendix 3 – Average timescales for housing emergency and non-emergency jobs 
Housing Emergency Repair Timescales – 2022/23 (All contractors) 
April May June July August September October November December January February March YTD
Total Time
Taken 6606:00:06 10351:42:04 7708:12:02 6623:05:03 8074:33:09 8269:07:00 8482:20:42 7961:08:58         64076:09:04
Total Jobs 2087 2303 2260 2202 2514 2377 2631 2476         18850
Average
Timescale 3:09:55 4:29:42 3:24:39 3:00:28 3:12:43 3:28:44 3:13:26 3:12:55         3:23:57 
Housing Non-Emergency Repair Timescales – 2022/23 (All contractors) 
April May June July August September October November December January February March YTD
No. Of Non
Emergency
Repairs 6462 6413 6607 5259 6724 6481 7214 8224         53384
Total
Number of
Days
Taken 48642 43119 45847 44211 48656 43097 44930 47411         365913
Average
Length of
Time Taken 7.53 6.72 6.94 8.41 7.24 6.65 6.23 5.76         6.85 
Page 18 of 221

Page 19

Housing Emergency Repair Timescales – 2022/23 (Mears only)  
April May June July August September October November December January February March YTD
Total Time
Taken 6054:14:06 7661:04:48 7032:53:33 5901:26:40 7231:48:56 7596:47:28 7746:02:48 7279:33:24         56503:51:43
Total Jobs 1759 1974 1923 1791 2127 1989 2280 2133         15976
Average
Timescale 3:26:31 3:52:52 3:39:26 3:17:42 3:24:00 3:49:10 3:23:51 3:24:46         3:32:12 
Housing Non-Emergency Repair Timescales – 2022/23 (Mears only)  
April May June July August September October November December January February March YTD
No. Of Non
Emergency
Repairs 3419 3602 3596 3224 3845 3678 3721 3738         28823
Total
Number of
Days
Taken 36847 33651 33514 31354 33428 34030 34569 37123         274516
Average
Length of
Time Taken 10.78 9.34 9.32 9.73 8.69 9.25 9.29 9.93         9.52 
Page 19 of 221

Page 20

Appendix 4 MEARS CORPORATE PERFORMANCE 2022/23  
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
Cat 1a -
Emergency
within Hours
(95%)
Total
228 277 235 124 218 215 216 272        
%
Within
99.12% 99.64% 99.57% 99.19% 98.17% 98.14% 99.54% 93.01%        
Cat 2 -
Routine 3
Day Works
(90%)
Total
70 140 116 57 133 121 126 89        
%
Within
100.00% 99.29% 95.69% 96.49% 98.50% 100.00% 99.21% 97.75%        
Cat 3 -
Routine 7
Day Works
(90%)
Total
79 135 77 41 77 118 126 169        
%
Within
100.00% 100.00% 97.40% 100.00% 97.40% 96.61% 99.21% 97.63%        
Cat 4 -
Routine 20
Day Works
(90%)
Total
310 311 203 195 266 266 222 307        
%
Within
98.71% 97.75% 98.52% 98.97% 98.50% 98.12% 96.40% 99.35%        
Programmed
Works  (95%)
Total
53 47 21 30 50 27 37 40        
%
Within
96.23% 97.87% 95.24% 100.00% 100.00% 100.00% 97.30% 97.50%        
Cyclic Works 
(95%)
Total
22 27 35 78 91 36 37 76        
%
Within
95.45% 100.00% 100.00% 100.00% 100.00% 100.00% 97.30% 76.32%         
Page 20 of 221

Page 21

Appendix 5 MEARS CORPORATE PERFORMANCE 2021/22 
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
Cat 1a -
Emergency
within Hours
(95%)
Total
195 263 187 91 232 273 267 324 248 226 254 235
%
Within
98.97% 98.86% 99.47% 98.90% 95.26% 99.63% 96.25% 99.07% 98.79% 97.79% 100.00% 98.30%
Cat 2 -
Routine 3
Day Works
(90%)
Total
71 152 114 49 130 149 141 129 95 93 120 79
%
Within
95.77% 96.05% 92.98% 100.00% 98.46% 100.00% 99.29% 100.00% 100.00% 96.77% 100.00% 100.00%
Cat 3 -
Routine 7
Day Works
(90%)
Total
62 98 74 46 92 100 76 87 44 48 65 43
%
Within
98.39% 97.96% 95.95% 100.00% 100.00% 98.00% 100.00% 100.00% 100.00% 95.83% 100.00% 100.00%
Cat 4 -
Routine 20
Day Works
(90%)
Total
329 316 365 242 300 395 440 458 309 286 309 237
%
Within
97.57% 99.37% 97.53% 98.76% 96.67% 97.72% 99.32% 98.69% 99.03% 99.65% 100.00% 99.16%
Programmed
Works  (95%)
Total
6 12 15 16 18 46 76 60 46 58 68 43
%
Within
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 97.37% 100.00% 100.00% 98.28% 100.00% 100.00%
Cyclic Works 
(95%)
Total
30 15 45 51 41 65 85 90 64 74 88 293
%
Within
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 98.98% 
Page 21 of 221

Page 22

Appendix 6 – Average timescales for corporate emergency and non-emergency jobs 
Corporate Emergency Repair Timescales – 2022/23 (Mears only) 
April May June July August September October November December January February March YTD
Total Time Taken 900:24:35 913:39:44 1005:37:14 454:07:45 1009:51:41 1501:03:25 1633:50:14 748:35:38         8167:10:16
Total Jobs 228 277 242 129 241 291 287 191         1886
Average
Timescale 3:56:57 3:17:54 4:09:20 3:31:13 4:11:25 5:09:30 5:41:34 3:55:10         4:19:50 
Corporate Non-Emergency Repair Timescales – 2022/23 (Mears only)  
April May June July August September October November December January February March YTD
No. Of Non
Emergency
Repairs 550 688 612 481 540 566 631 448         4516
Total Number of
Days Taken
6562 5565 4689 4701 3722 3522 5403 4067         38231
Average Length of
Time Taken 11.93 8.09 7.66 9.77 6.89 6.22 8.56 9.08         8.47 
Page 22 of 221

Page 23

Appendix 7 Mears contribution to The Plan for North Lanarkshire  
Service Area Target Outcome/Purpose 2021/22
Actual 
Comments
Q1 Q2 Q3 Q4
Improve Economic Opportunities and Outcomes
OBJECTIVE: Provide supported routes out of unemployment or underemployment
Number of trade and Modern
apprenticeships
Contribute to the long-term
economic sustainability of North
Lanarkshire
51         51 73   65   22 apprentices recruited in August 2022.  Which will take
us to 195 over the length of the contract.
We currently have 8 apprentices which are due to complete
their apprenticeship in Q3.  All operatives will be offered a
position within the team.
OBJECTIVE: Help current and incoming businesses to grow and create employment
Number of local suppliers Contribute to the long-term
economic sustainability of North
Lanarkshire.
34 suppliers
with a
spend of
£7.12m 
20
Suppliers
with a
spend of
£2.4 m
19
Suppliers
with a
spend of
£3.4m
16
Suppliers
with a
spend of
£2.1m 
Local supply chain spend.
Spend is per quarter (not cumulative). 
Q3 (only includes October and November activity – subject
to change post completion of December). 
Improving the Health and Wellbeing of our Communities
OBJECTIVE: Enable more people to live longer at home and to live as independently as possible
Safer homes advice and
installations
To provide safety and security
measures to vulnerable groups
such as elderly and victims of
domestic abuse.
1518 items
fitted to 262
properties
279 items
fitted to 50
properties 
336 items
fitted to 59
properties  
236 Items
fitted
across 42
properties    
Q3 (only includes October and November activity – subject
to change post completion of December).   
Page 23 of 221

Page 24

Schools work experience and
engagement
Provide young people with an
opportunity to get an insight into
a possible career
0 1 0   3   Buchannan High Trade Work experience resumed in Q3. 
Two additional placements for office work experience in
Q3.   
Recruitment fairs/career talks Provide young people with an
opportunity to get an insight into
a possible career and routes to
work
1 2  0 2    Braidhurst High Careers Event (28.09.22)
Dalziel High Careers Event (28.09.22) 
Apprenticeship projects to
support local communities
Provides apprentices with the
opportunity to work with local
communities to add value to
facilities as well as work with
local groups and events to
enable others to deliver
community benefits within their
area 
0 2  0       8    8 Apprentices volunteered at St Andrews Hospice for Light
Up a Life event. 
Enhance Participation, Capacity and Empowerment Across Our Communities  
OBJECTIVE: Improve community participation and engagement in the planning and delivery of services
Housing Tenant Conferences Positively promote the
partnership
0 0  0 1   Attended tenants conference at Airdrie Academy on 26
November 2022
Sporting Events Positively promote the
partnership
0 0 0   0   Not applicable for 21/22.
Best Value Efficiency Savings To positively support the
partnership, deliver efficiencies
to the Schedule of Rates
payable via the works
agreement.
£1,512,762 £611,227 £326,281 £302,751    Q3 1st October – 16th December 
Page 24 of 221

Page 25

Appendix 8
MEARS Scotland LLP         
Financial Performance as at September 2022       
Income & Expenditure          2022  2021 
Budget Actual
Variance to
Budget 
Full Year
Budget  Actual Outturn 
£m £m £m  £m  £m 
Total Sales   39,072 41,993 2,921  49.989  48.856 
Total Direct Costs  31,578 33,359 -1,782  40.405  39.753 
Gross Margin   7,494 8,634 1,140  9.584  9.103 
Operational %   19.2% 20.6% 39%  19.17%  18.63% 
Total
Overheads   5,849 6,979 -1,130  7.751  7.922 
Net Trading Profit  1,645 1,655 9.353  1.833  1.181 
Profit %    4.2% 3.94% 0.3%  3.7%  2.4% 
Page 25 of 221

Page 26

MEARS Scotland LLP   Appendix 9      
Overall Financial Standing - Balance Sheet as at September 2022 
Balances / Indicators 2022 YTD 2021 Final Outturn 
£m £m 
Total Fixed Assets 0.031 0.078 
Stock     3.375 2.284 
Trade & Other Debtors 0.656 0.408 
Cash     11.305 7.727 
Trade & Other Creditors -9.581 -6.113 
Government Bodies - tax, VAT, NI -1.795 -2.079 
Inter Company Trading loan -1.731 -1.663 
Total Net Assets/ (Liabilities) 2.260  0.642             
Current Ratio   1.35 1.27 
Page 26 of 221

Page 27

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref BL/MH/HD Date 15/02/23 
Saltire Performance Report to 30 November 2022 
From  Brian Lafferty, Chief Officer, Housing Property Services
E-mail  HendryM@northlan.gov.uk  Telephone  Michelle Hendry,
07960974797 
1. Background 
1.1 As per the recommendation to Committee on 7 June 2012, it was agreed that a
six monthly report be established to detail performance across agreed Key
Performance Indicators (KPI’s), customer satisfaction and complaints to support
the ongoing review and associated improvement actions within the delivery of the
strategic partnership vehicles. 
1.2 Following consideration and approval by the Policy & Resources Committee in
March 2017, the Council’s Strategic Adviser (External Organisations) concluded
the sale of the Council’s 33% shareholding in Saltire in May 2017. The works
agreement would govern the Central Heating Repairs and Maintenance Delivery
service, also being varied to maintain the benefits and protections which the
Council had previously enjoyed from its shareholding until expiry on the contract
Executive Summary
The purpose of this report is to provide a detailed update on the current 2022/23
performance of the Business Housing Property Central Heating Repairs & Maintenance
service delivery contracts. 
Recommendations
It is recommended that the Housing Committee: 
(1) Acknowledge the report in relation to the continued ongoing improved
performance of the service delivery contract. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth 
AGENDA ITEM 3
Page 27 of 221

Page 28

in January 2021 and agreed extensions that have been approved at Committee.
In relation to the contract extension, Saltire are now in the second year, this
commenced on 8 January 2022 until 7 January 2023. It should also be noted that
the third year was approved at committee which is from 8 January 2023 to 7
January 2024. 
1.3 In line with the role and nature of the previous strategic partnership vehicle,
performance will continue to be reported to Committee during the extension
periods. 
2. Report 
2.1 Performance Indicators 
2.1.1 KPI performance for 2022/23 in relation to Heating Repairs & Maintenance is
attached as Appendix 1. Appendix 2 also contains the full KPI set for 2021/22.
Appendix 3 contains the full breakdown of emergency and non-emergency
repairs jobs carried out by month for all 3 linked contractors, as well as Saltires
only. 
2.1.2 As of November 2022/23 the contract achieved 100% gas certification record for
the extensive gas heated housing asset base. 
2.1.3  All KPI areas continued to be subject to a full audit programme to ensure validity,
with wider associated improvement actions details via the formal liaison structure
to ensure full transparency and accountability. 
2.2 Business Housing Property and Projects Performance / Developments 
2.2.1  The timescale in completing emergency repairs for all 3 linked contractors, year
to date, is currently 3.23 hours. Saltire year to date, average emergency
timescales are 2.29 hours. The 2021/22 Scottish average was 4.20 hours. 
2.2.2 The timescale for completing non-emergency repairs, for all 3 linked contractors,
year to date, is currently 6.85 days. Saltire average non-emergency timescales
is 0.82 days.  The 2021/2 Scottish average was 8.9 days 
2.2.3 It should also be noted that repairs carried out right first time has been reported
at 97.42 % over the same period. The 2021/2 Scottish average was 88.3% 
2.2.5  Current customer satisfaction level is 94.27% year to date. The 2021/22 Scottish
average was 88.0%. We continue to receive various methods of surveys which
include online, post inspection stage of works and face to face with tenants.
Customer satisfaction surveys continue to inform action and help ensure that any
areas of dissatisfaction are immediately followed up. 
2.2.6 Frontline resolutions - The number of Stage 1 complaints received for 2022/23
relating to all of Housing Property and Projects, have increased in comparison
with the same period last year (see table 1 below).  Of the complaints responded
to year to date, a total of 67.68% have been upheld or partially upheld, in the
same period last year 65.77% were upheld. 92.42% of complaints YTD have
been responded to within SPSO timescales, in comparison to 98.66% of
Page 28 of 221

Page 29

complaints in the same period in 2021/22. Eight stage one complaints were
received YTD in relation to Saltire, they were responded to within timescale and
50% were upheld. An analysis of all complaints received is undertaken by Local
Homes to allow any re-occurring issues to be addressed and associated service
improvement actions to be progressed
2.2.7  Investigations – The number of Stage 2 complaints received for 2022/23,
relating to all Housing Property and Projects service, has decreased in
comparison to the same period last year (see table 1 below) A total of 57.14% of
closed cases have been upheld or partially upheld which is a decrease in
comparison to 77.27% upheld or partially upheld in the same period last year.
95.24% of complaints received as stage 2 complaints were responded to within
SPSO timescale in comparison to 95.45% of complaints in the same period in
2021/22.  There has been no stage 2 complaint received in relation to Saltire
within 2022/23 to date. 
2.2.8 It should be noted that in relation to the number of complaints as a comparison
to the number of emergency and non-emergency repairs, which equated to
72,234 from April to Nov 2022 this equates 0.3 as a % of complaints as a
comparison. 
Table 1 Housing property and projects complaints received via Council between
each financial year.   
2022/23 2021/22 (for comparison) 
Q1 Q2  Q3 Oct &
Nov only
Q4 Total Q1 Q2 Q3 Q4 Total
Stage
1
73 63 62  198 54 50 55 61 220
Stage
2
7 9 5  21 9 7 8 9 33
Total 80 72 67  219 63 57 63 70 253 
3. Measures of success 
3.1  The ongoing Partnership Performance monitoring report requires Committee to
consider Saltire Facilities Management Limited performance twice per year.
These reports detail the activities which are expected to support delivery of the
Council’s priority outcomes, as well as the organisation’s performance against
these and should therefore ensure elected members have sufficient information
to assess how Saltire service delivery supports the Council in delivering against
The Plan for North Lanarkshire as well as producing a high level of service
delivery, legal compliance and customer satisfaction.     
4. Supporting documentation 
Appendix 1: Saltire Performance 2022/23
Appendix 2: Saltire Performance 2021/22
Page 29 of 221

Page 30

Appendix 3: Emergency Repair Timescales and Non-Emergency Repair Timescales 
Brian Lafferty
Chief Officer, Housing Property Services 
Page 30 of 221

Page 31

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☒
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
Page 31 of 221

Page 32

Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10  Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes  ☐  No   ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 32 of 221

Page 33

Appendix 1 SALTIRE HOUSING PERFORMANCE 2022/23  
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
Cat 1a -
Priority U
(95%)
Total 5 3 4 4 2 9 7 5        
%
Within 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%        
Cat 1b -
Priority E
(95%)
Total 0 0 0 0 0 0 0 3        
%
Within N/A N/A N/A N/A N/A N/A N/A 100.00%        
Cat 2 -
Routine -
Priority 1
(95%)
Total 504 479 456 259 380 366 528 692        
%
Within 99.40% 100.00% 99.56% 100.00% 99.74% 100.00% 99.81% 100.00%        
Cat 3 -
Routine -
Priority 2
(95%)
Total 23 20 8 5 11 20 12 10        
%
Within 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%        
Cat 4 -
Routine -
Priority 3
(95%)
Total 526 501 925 476 754 702 654 1354        
%
Within 99.24% 98.60% 99.89% 99.16% 99.73% 99.00% 99.39% 99.19%        
Empty House
Works -
Priority 4
(95%)
Total 196 239 242 215 258 178 222 209        
%
Within 98.98% 97.91% 99.17% 96.74% 98.84% 99.44% 98.20% 99.04%        
Empty House
Works -
Priority 5
(95%)
Total 139 147 191 141 184 144 160 150        
%
Within 99.28% 100.00% 98.43% 99.29% 100.00% 99.31% 99.38% 100.00%        
Routine
Works - P9
(95%)
Total 0 0 0 0 0 0 0 0        
%
Within N/A N/A N/A N/A N/A N/A N/A N/A        
Priority P -
Extended
Priorities
(95%)
Total 0 0 0 0 0 0 0 0        
%
Within N/A N/A N/A N/A N/A N/A N/A N/A        
Priority C -
24hour
Emergency
(95%)
Total 1575 1400 1194 864 1234 1415 1919 1996        
%
Within 99.37% 99.64% 99.83% 99.77% 99.92% 99.58% 98.44% 99.95%        
Priority D -
Capital Boiler
renewals
(95%)
Total 118 97 65 65 80 62 77 95        
%
Within 100.00% 100.00% 100.00% 98.46% 100.00% 98.39% 100.00% 100.00%        
Priority B - 2
hr Emergency
within working
hours (95%)
Total 8 6 5 4 3 10 11 6        
%
Within 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%        
Priority F - 2
hr Emergency 
outwith
working hours
(95%)) 
Total 2 0 0 0 0 0 1 1        
%
Within
100.00% N/A N/A N/A N/A N/A 100.00% 100.00%        
Adaptations -
40 Days (95%)
Total 5 1 6 5 7 6 9 4        
%
Within 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%         
Page 33 of 221

Page 34

Appendix 2 SALTIRE HOUSING PERFORMANCE 2021/22 
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
Cat 1a -
Priority U
(95%)
Total 3 2 2 2 3 5 2 1 3 3 4 7
%
Within 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Cat 1b -
Priority E
(95%)
Total 0 2 1 1 0 2 1 0 1 0 1 0
%
Within N/A 100.00% 100.00% 100.00% N/A 100.00% 100.00% N/A 100.00% N/A 100.00% N/A
Cat 2 -
Routine -
Priority 1
(95%)
Total 435 409 421 330 433 496 610 646 625 568 458 551
%
Within 100.00% 99.76% 100.00% 100.00% 99.77% 99.60% 99.18% 100.00% 99.68% 99.82% 99.56% 99.46%
Cat 3 -
Routine -
Priority 2
(95%)
Total 39 41 34 15 19 15 35 17 50 101 19 31
%
Within 100.00% 100.00% 97.06% 100.00% 100.00% 100.00% 100.00% 100.00% 98.00% 100.00% 100.00% 96.77%
Cat 4 -
Routine -
Priority 3
(95%)
Total 2630 856 1217 982 418 1290 1199 1017 890 409 952 1058
%
Within 100.00% 100.00% 99.84% 99.59% 98.33% 99.53% 99.08% 99.12% 98.99% 98.53% 98.32% 99.34%
Empty House
Works -
Priority 4
(95%)
Total 260 215 253 226 197 206 262 243 233 212 195 282
%
Within 98.46% 96.74% 98.81% 99.56% 99.49% 96.60% 98.47% 98.35% 97.00% 99.53% 95.90% 98.58%
Empty House
Works -
Priority 5
(95%)
Total 206 189 196 182 215 180 208 198 264 153 190 197
%
Within 100.00% 100.00% 98.47% 99.45% 98.60% 100.00% 98.56% 98.99% 99.62% 99.35% 99.47% 98.98%
Routine
Works - P9
(95%)
Total 0 0 0 0 0 0 0 0 0 0 0 0
%
Within N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Priority P -
Extended
Priorities
(95%)
Total 0 0 0 0 0 0 0 0 0 0 0 0
%
Within N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Priority C -
24hour
Emergency
(95%)
Total 1691 1562 1114 896 1351 1287 1571 1782 1979 2054 1847 1937
%
Within 99.35% 99.36% 99.73% 99.67% 99.70% 99.77% 99.05% 99.44% 99.44% 99.17% 99.46% 99.28%
Priority D -
Capital Boiler
renewals
(95%)
Total 75 75 72 62 60 55 75 49 68 56 58 75
%
Within 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 98.21% 98.28% 98.67%
Priority B - 2
hr Emergency
within working
hours (95%)
Total 42 54 52 76 78 80 56 97 86 19 21 18
%
Within 100.00% 100.00% 100.00% 100.00% 100.00% 98.75% 98.21% 100.00% 98.84% 100.00% 100.00% 100.00%
Priority F - 2
hr Emergency 
outwith
working hours
(95%)) 
Total 4 10 5 5 8 8 10 11 8 3 1 3
%
Within
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Adaptations -
40 Days (95%)
Total 2 1 3 10 4 5 4 2 0 5 6 8
%
Within 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% N/A 100.00% 100.00% 100.00% 
Page 34 of 221

Page 35

Appendix 3 – Average timescales for housing emergency and non-emergency jobs 
Housing Emergency Repair Timescales – 2022/23 (All contractors) 
April May June July August September October November December January February March YTD
Total
Time
Taken 6606:00:06 10351:42:04 7708:12:02 6623:05:03 8074:33:09 8269:07:00 8482:20:42 7961:08:58         64076:09:04
Total
Jobs 2087 2303 2260 2202 2514 2377 2631 2476         18850
Average
Timescale 3:09:55 4:29:42 3:24:39 3:00:28 3:12:43 3:28:44 3:13:26 3:12:55         3:23:57 
Housing Non-Emergency Repair Timescales – 2022/23 (All contractors) 
April May June July August September October November December January February March YTD
No. Of Non
Emergency
Repairs 6462 6413 6607 5259 6724 6481 7214 8224         53384
Total
Number of
Days Taken 48642 43119 45847 44211 48656 43097 44930 47411         365913
Average
Length of
Time Taken 7.53 6.72 6.94 8.41 7.24 6.65 6.23 5.76         6.85 
Page 35 of 221

Page 36

Housing Emergency Repair Timescales – 2022/23 (Saltire only) 
April May June July August September October November December January February March YTD
Total
Time
Taken 25:51:17 17:05:37 23:27:48 19:09:57 9:54:33 55:16:06 63:59:16 29:41:25         244:25:59
Total
Jobs 15 9 9 8 5 19 19 14         98
Average
Timescale 1:43:25 1:53:57 2:36:25 2:23:45 1:58:55 2:54:32 3:22:04 2:07:15         2:29:39 
Housing Non-Emergency Repair Timescales – 2022/23 (Saltire only)  
April May June July August September October November December January February March YTD
No. Of Non
Emergency
Repairs 2632 2401 2590 1607 2383 2420 3003 3967         21003
Total
Number of
Days
Taken 2388 2291 2076 1765 1807 1771 2475 2655         17228
Average
Length of
Time
Taken 0.91 0.95 0.80 1.10 0.76 0.73 0.82 0.67         0.82 
Page 36 of 221

Page 37

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref  SL/ MK/ AMcK Date 15/02/23 
Local Housing Strategy 2021-2026 Annual Progress Review 
From  Stephen Llewellyn, Chief Officer Housing Management  
E-mail llewellyns@northlan.gov.uk Telephone 01698 274192 
1. Background 
1.1 The Housing (Scotland) Act 2001 places a statutory requirement on local authorities
to produce a Local Housing Strategy (LHS) that sets out its strategy, priorities, and
plans for the delivery of housing and related services. 
1.2 Local authorities are expected to review progress annually and to submit a copy of
the review to the Scottish Government More Homes Area Team. The review must
also be made available on the council’s website.
Executive Summary 
The purpose of this report is to advise committee of the progress made in delivering the
strategic priorities and actions set out in the Local Housing Strategy 2021-2026. 
The Local Housing Strategy is the main overarching strategy for housing and housing
related services in North Lanarkshire. It is an all-tenure document which sets the strategic
direction in key areas such as homelessness, house condition, housing delivery, specialist
provision, climate change and fuel poverty. The Local Housing Strategy for 2021-2026 was
approved by Committee in November 2021. Local authorities are required to report on
progress annually and to publish this on their website. This is the first annual progress
review since the strategy was approved. 
Recommendations 
It is recommended that Housing Committee: 
• Note the progress made to date in delivering the actions set out in the Local
Housing Strategy 2021-2026.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
AGENDA ITEM 4
Page 37 of 221

Page 38

1.3 North Lanarkshire’s LHS for 2021-26 was approved by Committee in November 2021.
The strategy plays an important part in delivering our ambition, set out in The Plan, to
make North Lanarkshire the place to live, learn, work, invest and visit. It is closely
connected and aligned to other key plans and strategies such as the Local
Development Plan, Town Visions, and the Economic Regeneration Delivery Plan. 
2. Report 
2.1 The vision set out in the strategy is: 
“To make North Lanarkshire the place to live, through provision of high-quality housing
and support in sustainable communities, that enables people to thrive and prosper” 
2.2 This vision is underpinned by seven priority outcomes which will be delivered over the
period 2021-2026: 
• We will increase the supply of high-quality sustainable homes across tenure 
• Our communities are vibrant, attractive, and sustainable
• We prevent and resolve homelessness effectively
• We have a range of housing options and supports which promote independence,
health, and wellbeing
• We will tackle climate change and fuel poverty
• Our homes will be fit for the future
• We contribute to improving the quality and accessibility of the private rented
sector 
2.3 The Action Plan contains 162 separate milestones, delivering on 41 actions, with the
LHS providing a framework for strategic monitoring and review. Of these milestones,
20 are complete and 126 are on track. Two milestones are slightly behind, twelve
milestones have not yet been started and two milestones are no longer applicable.
None are significantly behind. 
2.4 A full report on progress under each priority is included in the LHS Annual Progress
Report and corresponding Action Plan (which are attached in the Appendix). Some of
the key progress made to date includes: 
• 389 new affordable homes built in 2021/22
• Expansion of the Open Market Purchase Scheme (OMPS) to allow purchase of
the last remaining owner in mixed tenure flats, enabling common works to progress
• Further expansion of the OMPS to allow purchase of properties from private
landlords where there is a risk of homelessness, with tenants remaining in the
property as a council tenant
• Development of a Housing Asset Management Database to help inform demand
and investment decisions
• 75 homes brought back into use through our Empty Homes Purchase Scheme
and Open Market Purchase Scheme, bringing the total properties bought to date to
594
• 79 council homes delivered in town centres and edge of town centre locations
• 91% of properties in Phase 1 of the re-provisioning programme now vacant, with
209 properties demolished during 2021/22
Page 38 of 221

Page 39

• First sites of the re-provisioning programme now under construction at
Northburn Avenue and Dykehead Road, Airdrie
• 41 long-term empty properties brought back into use in 2021/22
• Time spent in temporary accommodation by homeless households reduced by 8.1
days since 2020/21
• More than £562,000 of grant funding from the Covid-19 Tenant Grant Hardship
Fund administered to support people affected financially by the Covid-19 pandemic
who had fallen into rent arrears and were at risk of becoming homeless
• Modules 1, 2, 3, 5 & 6 of the Housing Options Toolkit released for use across the
country
• Homes previously earmarked for demolition through the re-provisioning programme
brought back into use to house refugees fleeing the war in Ukraine
• Implementation of our incentive to downsize scheme
• Over £17m invested in energy efficiency works in 2021/22
• Construction of 19 ‘Net Zero’ homes at Dykehead Road, Airdrie which feature
several low carbon technologies including air-source heat pumps, battery storage,
enhanced solar PV arrays and enhanced insulation
• Installation of our first electric vehicle charging points on a new build housing
development at Nobles View, Bellshill
• Low-income households at risk of fuel poverty were supported with almost £1m
of funding through the Tenant Hardship Payment Scheme
• Investment of more than £27m to improve the quality of our homes in the past
year, including £13 on roof and render, £6.5 on kitchens and bathrooms, and £4.2m
on home safety and security
• Private Landlord Forum re-established this year, the first time the event has been
held since 2017
• Several hundred inspections carried out by Private Sector Officers in support of
the Ukrainian Re-settlement Programme. 
2.5 The LHS is a five-year plan. Progress will continue to be monitored and reported
annually through the Local Housing Strategy Steering Group and Housing Committee. 
3. Measures of success 
3.1  Delivery of actions set out in the LHS Action Plan (attached in the Appendix).     
4. Supporting documentation 
4.1  Appendix – Local Housing Strategy Annual Progress Report 2022 
Stephen Llewellyn
Chief Officer, Housing Management 
Page 39 of 221

Page 40

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?  
The LHS has a positive impact on several protected characteristic areas, through
the provision of improved housing and related services to meet a broad range of
needs. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒  
The LHS contains financial impacts.  As this report is a progress report, it does not
contain any direct financial impacts. 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
Page 40 of 221

Page 41

5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
There are several actions in the LHS that have a positive impact on meeting our
climate change targets. Progress has been made on several key actions relating to
improving energy efficiency of housing stock which reduce our carbon emissions. 
Further detail is set out in out in the progress report. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Risk is recorded on the Service Risk Register and managed accordingly. 
Page 41 of 221

Page 42

5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Consultation and engagement with the Armed Forces Community was carried out
as part of the LHS development process.  This has directly informed the actions
and milestones set out in the strategy. 
Page 42 of 221

Page 43

LOCAL HOUSING STRATEGY 
ANNUAL PROGRESS REPORT 2022
Page 43 of 221

Page 44

Page 44 of 221

Page 45

3
Local Housing Strategy Annual Progress Report 2022
Contents
Introduction  ....................................................................................... 4
Housing delivery  ................................................................................ 6
Placemaking and communities  .......................................................... 8
Preventing and addressing homelessness  ......................................... 10
Specialist provision ............................................................................ 12
	
Fuel	poverty,	energy	efficiency	and	climate	change ............................ 14
House condition  ................................................................................ 17
Private sector housing  ....................................................................... 18
Strategic housing outcomes .............................................................. 19
Page 45 of 221

Page 46

4
Local Housing Strategy Annual Progress Report 2022
Introduction
The Local Housing Strategy (LHS) is the main overarching plan for housing. It sets out our
housing priorities and the actions we will take to achieve our vision:
“To make North Lanarkshire the place to live, through provision of high-quality housing and
support in sustainable communities, that enables people to thrive and prosper”
The strategy plays an important part in delivering
our ambition set out in The Plan to make North
Lanarkshire the place to live, learn, work, invest
and visit, and is closely connected and aligned to
other key plans and strategies such as the Local
Development Plan, the Town Visions, and the
Economic Regeneration Delivery Plan.
The strategy will help deliver real improvements to
people’s lives, by:
• Continuing to build much needed new affordable
homes, reducing poverty, boosting the local
economy and improving outcomes
• Improving	the	quality	and	energy	efficiency	of	
housing, helping reduce fuel poverty and helping
achieve our net-zero climate change target
• Delivering a range of support services to help
people achieve their potential, be healthy and
included
• Helping create sustainable and attractive
communities, through tackling empty homes and
low demand and regenerating areas and places
North Lanarkshire’s Local Housing Strategy for
2021-26 was approved by Committee in November
2021.	This	is	the	first	annual	update	on	progress	
since the strategy was approved and provides an
update on progress since the LHS was published,
featuring key highlights and achievements as well as
ongoing challenges.
Strategic Context
The Housing (Scotland) Act 2001 places a statutory
requirement on local authorities to prepare a Local
Housing Strategy supported by an assessment
of housing need and demand. The LHS provides
the strategic direction, together with policies and
plans to enable the council and its partners to
invest in the delivery of high-quality affordable
housing and housing related services, across all
housing	tenures,	to	meet	identified	need.	There	is	
a requirement to set out the contribution housing
can make towards the effective integration of health
and social care; as well as its approach to meeting
a range of statutory housing responsibilities such as
addressing fuel poverty, improving house condition
and homelessness.
Page 46 of 221

Page 47

5
Local Housing Strategy Annual Progress Report 2022
Our Priorities
Our LHS has seven priority outcomes which will
be	delivered	over	the	five-year	period	2021-2026.	
These priorities are:
• Priority 1: We Will Increase the Supply of High-
Quality Sustainable Homes Across Tenure
• Priority 2: Our Communities Are Vibrant,
Attractive and Sustainable
• Priority 3: We Prevent and Resolve
Homelessness Effectively
• Priority 4: We Have a Range of Housing Options
and Supports Which Promote Independence,
Health and Wellbeing
• Priority 5: We Will Tackle Climate Change and
Fuel Poverty
• Priority 6: Our Homes Will Be Fit for The Future
• Priority 7: We Contribute to Improving the
Quality and Accessibility of The Private Rented
Sector
Progress on the seven priorities is outlined in this
report highlighting any key success and challenges.
The action plan indicates the status of each action.
Page 47 of 221

Page 48

6
Local Housing Strategy Annual Progress Report 2022
Housing delivery
PRIORITY 1: WE WILL INCREASE THE SUPPLY OF HIGH-QUALITY
SUSTAINABLE HOMES ACROSS TENURE
New Supply Affordable Housing
Despite	ongoing	challenges	due	to	inflation	and	resource	availability,	we	
delivered 137 new affordable homes for rent in 2021/22 and are on track to
achieve the target of delivering 5,000 new, affordable rented homes by 2035.
This brings the total new council homes built in North Lanarkshire to 9701.
Site Name Area Number of Homes Completion Date
Caledonian Avenue Bellshill 8 April 2021
Dimsdale Road Wishaw 55 November 2021
Roberts Street Wishaw 16 February 2022
Lismore Drive Coatbridge 58 February 2022
Mossburn, Waterloo (20 units) and Plains Primary School have also been completed post- 31st
March 2022.
389 new
affordable
homes built
Scottish Government
funding of £32.9m
secured for 2023/24
22 wheelchair
liveable homes
SHIP planned delivery of 3,229
homes	over	the	next	five	years
25 MMR homes
planned by 2027
We have secured a number of new sites for our homes, including several town
centre sites as well as land linked to our tower re-provisioning programme. We
currently have 421 homes under construction.
Site Name Area
Number of
Homes
Scheduled
Completion Date
Lindsaybeg Road (former Chilterns Home) Chryston 21 February 2023
Community Road Bellshill 29 January 2023
Northburn Avenue (Re-provisioning) Airdrie 31 March 2023
South Bridge Street (Former Orrs Building) Airdrie 20 June 2023
Earls Rise (Gateside Farm) Stepps 30 August 2023
Dykehead Road (Re-provisioning) Airdrie 150 September 2023
Ravenscliff Road (Former BRE site) Motherwell 24 October 2023
Berwick Street Coatbridge 19 November 2023
Castlehill Road Wishaw 97 May 2024
1 As at November 2022 Page 48 of 221

Page 49

7
Local Housing Strategy Annual Progress Report 2022
Community	benefits	are	built	into	every	council	new	build	contract,	helping	to	
secure work experience and job opportunities for local residents, providing
educational support via virtual school sessions, as well as supporting local
businesses through supply chain improvements.
Our RSLs partners have delivered 252 affordable homes over the past year,
increasing the total number of new affordable homes built in the past year to
389.
The	Pathfinder	Scheme,	which	allows	the	council	to	purchase	new	affordable	
homes directly from private developers, is progressing well. We are currently in
the process of purchasing 24 homes at Lorne Place in Coatbridge, 39 homes
at	the	former	DWP	offices	in	Coatbridge	and	20	homes	at	the	former	Orrs	
Department Store in Airdrie (where works are now on-site).
Over the past year we have brought 75 homes back into use through our Empty
Homes Purchase Scheme and Open Market Purchase Scheme, bringing the
total properties bought to date to 594. Despite current market pressures which
have reduced supply and increased costs, the scheme continues to be popular,
allowing us to increase the supply of affordable housing whilst also addressing
issues associated with property repair and long-term empty homes.
In 2021, committee approval was given to expand the scheme to allow the
purchase	of	properties	from	owners	in	blocks	of	flats	and	cottage	flats,	where	
all	the	other	flats	are	already	owned	by	the	council,	allowing	them	to	stay	in	
their	homes	as	tenants.	This	helps	to	progress	common	works	for	the	benefit	of	
our tenants. A further expansion of the scheme in August 2022 means that we
will also consider buying homes from private landlords and allow the tenant to
remain living in the home as a council tenant, helping prevent homelessness and
increase the council’s housing stock.
Our Strategic Housing Investment Programme (SHIP) for 2022/23-2026/27
was approved by Committee in August 2022 and subsequently submitted to
the Scottish Government in October 2022. The SHIP sets out plans to deliver
over	3,200	new	affordable	homes	in	the	next	five	years,	helping	regenerate	local	
communities and support the economy by creating new jobs.
Despite increased grant subsidy available from the Scottish Government, a
refreshed	feasibility	study	and	financial	analysis	has	shown	that,	at	present,	
delivery	of	Mid-Market	Rent	(MMR)	by	the	council	remains	financially	unviable.	
However, work is ongoing to establish a Housing Delivery Partnership to deliver
alternative tenures should market conditions allow. We are also exploring
options for delivery of MMR in town centres through the Town Centre Project
and Levelling-up Agenda.
Work on the third Glasgow and Clyde Valley Housing Need and Demand
Analysis is now complete and due to be submitted to the Centre for Housing
Market Analysis for ‘Robust and Credible’ status assessment. Further
discussions on setting the Housing Supply Target will commence thereafter with
anticipated completion in Spring 2023 for inclusion within the LHS.
North Lanarkshire’s Local Development Plan (LDP) was adopted by Scottish
Ministers in July 2022. The LDP includes a continuation of the Affordable
Housing Policy for the Cumbernauld Housing Sub-Market Area, with the
potential for this to be applied elsewhere on a case-by-case basis. Revision of
the Supplementary Planning Guidance now includes provision for Shared Equity
housing as a delivery option. A separate options report on the delivery of Shared
Equity is also now complete.
We have developed a Housing Asset Management Database which captures a
range of information to help inform demand and investment decisions. Work is
underway to test assumptions before weightings are applied and the information
is used to draw conclusions.
Page 49 of 221

Page 50

8
Local Housing Strategy Annual Progress Report 2022
Placemaking and communities
PRIORITY 2: OUR COMMUNITIES ARE VIBRANT, ATTRACTIVE AND SUSTAINABLE
Our key Town Centre Ambition projects are on track to proceed this year subject to the
acquisition	of	The	Centre	in	Cumbernauld	Town	Centre	proceeding	this	financial	year.	
Significant	funding	has	been	provided	by	the	Scottish	Government	and	UK	Government	for	
regeneration projects.
During 2021/22, we delivered 79 council homes
in town centres and edge of town centre locations
bringing our total to 104 homes.
Town Centre visions have been developed for all
eight town centres in North Lanarkshire and work is
well underway to develop action plans for each of
the town centres. To help deliver our visions, work is
underway to prepare and submit bids to supplement
the council’s own capital investment. This includes
the	UK	Government’s	Levelling	Up	Fund,	the	
Scottish Government’s Place Based Investment
Programme and Regeneration Capital Grant Fund,
the Vacant and Derelict Land Fund and Vacant and
Derelict Land Investment Programme. Funding bids
have also been prepared seeking National Lottery
Heritage Fund and Historic Environment Scotland
support to deliver the heritage-led regeneration of
Airdrie town centre. The council is also exploring
opportunities to lever in external funding to deliver
mid-market rent in our town centres.
Some key progress over the period includes:
• Demolition of Bank Street, Coatbridge to enable
residential development
• Detailed designs and plans produced to convert
the	former	Municipal	Buildings	at	Kildonan	Street,	
Coatbridge into residential accommodation
• Completion of Broomknoll Street town centre
site in Airdrie, delivering 30 new homes by Clyde
Valley Housing Association
• Demolition of the former Orrs department store
for residential redevelopment
• Creation of a new active travel link connecting
Abronhill with Cumbernauld Town Centre
• Acquisition of the Old Town Hall in Motherwell for
conversion to residential use
• Acquisition of the Masonic Halls in Motherwell
for façade retention and redevelopment for
residential use
• Acquisition	and	demolition	of	the	former	office	
building	Kingshouse,	Wishaw	for	residential	
redevelopment
• Commencement of construction works on the
former Tesco site in Wishaw to create new
housing, scheduled for completion in early 2023
• Properties re-developed on Buchanan Street
and Graham Street in Airdrie to deliver both
commercial and residential accommodation
Page 50 of 221

Page 51

9
Local Housing Strategy Annual Progress Report 2022
In line with our ambitions to develop integrated
community hubs throughout North Lanarkshire, we
have commenced work on three community hubs
this year:
• Newmains and St Brigid’s Community Hub which
will provide a shared campus for two primary
schools and a family learning centre, delivering
an inclusive learning environment and modern
facilities for all members of the community.
• Chryston Community Hub which will replace
the existing primary school and provide a new
Community Health Clinic, offering residents
access to state-of-the-art health and wellbeing
facilities.
• Riverbank Community Hub, Coatbridge which
will bring together two primary schools, Carnbroe
PS and Sikeside PS, along with an early years
class. The hub is designed to provide an exciting
and	flexible	learning	environment	which	will	
accommodate a wide range of requirements both
now and in the future.
The	local	community	is	set	to	benefit	through	
building of the hubs, as local contractors and
smaller businesses will be supported, and work
placements and training opportunities created.
All three hubs are anticipated to be complete by
Autumn 2023.
Good progress continues to be made on the
Ravenscraig Access Road, with the construction
of the rail bridge currently running ahead of
programme. In preparation for the following stages,
detailed	specifications	and	tender	documents	
for procurement of the new connection between
Motherwell and Ravenscraig have been developed.
The contract is expected to be awarded in summer
2023, following completion of the bridge.
Phase 1 of the re-provisioning programme is
progressing well with 1,600 out of 1,750 properties
now vacant. Only one owner remains in-situ.
Negotiations to purchase this property are ongoing.
Options for Phase 2 are currently being considered
using	findings	from	the	structural	survey,	demand	
analysis and the availability of housing for re-
provisioning.
Demolition of Coursington, Allan and Draffen Towers
in	Motherwell	and	the	Shawhead	flats	in	Coatbridge	
is progressing well. Site establishment at both sites
is now complete and meetings with nearby residents
have been held to inform them of proceedings.
A total of 209 properties were demolished during
2021/22 which met all year end targets.
The contract to demolish 8 low-rise blocks at
Gowkthrapple, Wishaw (Phase 1) has recently been
terminated due to a request from the contractor for
a	significant	uplift	to	the	original	tender	value.	We	
are now undertaking a revised procurement exercise
which will include all 19 blocks on the site including
the surrounding structures. This isn’t expected
to delay the programme, which is on track for
completion by 2025.
The	first	sites	of	the	re-provisioning	programme	are	
now under construction at Northburn Avenue and
Dykehead Road, Airdrie. These developments will
deliver	over	180	modern	and	energy	efficient	new	
build homes for the local area and are planned for
completion by the end of 2023.
Creation of 20-minute neighbourhoods with good
access to physical, digital and social infrastructure
continues to be progressed through several
ways. This includes the Town Centre Visions,
the Active Travel Strategy, the creation of Town
and Community Hubs as well as the New Supply
Programme, which includes the expansion of
the Open Market Purchase Scheme to increase
supply whilst addressing important issues such as
prevention of homelessness, mixed tenure repairs
to improve housing condition, as well as tackling
the blight of empty homes in communities. The new
Local Development Plan, which was adopted in
2022, sets out the Placemaking Policies which help
create 20-minute neighbourhoods.
A total of 41 long-term empty properties were
brought back into use in the private sector during
2021/22, with a further 4 brought back into
use as social housing through the Open Market
Purchase	Scheme.	The	Empty	Homes	Officer	has	
been working alongside colleagues from Building
Standards, Environmental Services and Planning
to bring properties back to habitable condition,
including one property in a conservation which has
been empty since 2009.
Page 51 of 221

Page 52

10
Local Housing Strategy Annual Progress Report 2022
Preventing and addressing
homelessness
PRIORITY 3: WE PREVENT AND RESOLVE HOMELESSNESS EFFECTIVELY
In response to the COVID-19 pandemic, and to
protect	those	experiencing	financial	hardship,	the	
Scottish Government implemented temporary
legislation to suspend all evictions from both private
and social housing for a period of up to 6 months.
The effect of this is apparent in the reduction of
households made homeless due to rent arrears,
which fell by 72% between 2019/20 and 2020/21
and remained similar in 2021/22. Emergency
legislation brought into force in October 2022 will
extend the moratorium on evictions offering extra
protection	to	those	facing	financial	difficulty	due	to	
the cost-of-living crisis.
By	carrying	out	financial	health	checks,	Welfare	
Rights	and	Income	Maximiser	Officers	have	helped	
generate	more	than	£35m	in	additional	benefits	for	
residents over the past year, working in partnership
with the Council’s Tackling Poverty Team. We have
also established a Universal Credit Assistance Fund
to help tenants who fall into rent arrears due to built-
in waiting times for Universal Credit payments, and
a Rent Relief Fund for those facing hardship due to
furlough or other reasons.
(2021/22 was 76.98 days representing a
reduction of 8.1 days from the 2020/21
period where it was 85.08).
(down slightly since last year)
1,697
48 individuals90.9%
homeless applications
in 2021/22
supported through Homes First
Repeat applications
down 34%
of new tenancies sustained
for more than a year
Youth homelessness reduced 
from  29.24% in 2020/21 
to  27.51% in 2021/22
(since 2015/16 youth homelessness has
reduced by 8.2% from 35.75% in 2015/16
to 27.51% in 2021/22)
Average length of stay in
temporary accommodation
REDUCED
Average rent £74.58 per
week (12.6% below Scottish
average for social landlords).
9th lowest Local
Authority rent
Page 52 of 221

Page 53

11
Local Housing Strategy Annual Progress Report 2022
We administered more than £562,000 of grant
funding from the Covid-19 Tenant Grant Hardship
Fund, set up by the Scottish Government to
support	people	affected	financially	by	the	Covid-19	
pandemic and who have fallen into rent arrears
and are at risk of becoming homeless.  Initiatives
continue to be implemented through the Council’s
Tackling	Poverty	Officers	Action	Group	which	
involves the third and independent sector, NHS
Lanarkshire and Council services, working together
with local people and communities to tackle the
current unprecedented cost-of-living crisis.
Modules 1, 2 and 3 of the Housing Options Toolkit
were	finalised	and	released	for	use	across	the	
country in January 2022.  These modules cover
all housing activity including legislation, policy and
practice delivery.  Modules 5 and 6, which cover
employability	and	financial	advice,	were	completed	
in the Spring and have also been made available for
use. Module 4 which is around Health and Wellbeing
is due for completion by January 2023.
We continue to deliver the Family Plus Project in
partnership with Barnardos Scotland, funded by
North Lanarkshire’s Alcohol and Drugs Partnership
(NLADP), which provides housing support to
families and young people affected by domestic
abuse, addictions and other trauma.  Other Rapid
Rehousing Delivery Plan (RRTP) partnership projects
that continue to be delivered include the Youth Life
Coach Project, which aims to upskill young people
with the skills and experience they need to live
independently and Creative Faces, which provides
opportunities for therapeutic interventions to improve
health and wellbeing amongst young people.  
Bespoke housing options for Care Experienced
Young People (CEYP) to prevent homelessness
and improve housing options for when housing
crisis or periods of housing insecurity arise have
been developed and a revised CEYP protocol has
been developed in partnership with Health and
Social Care to improve pathway planning for CEYP
in North Lanarkshire.  Youth Housing Champions
have also been established across all our housing
localities, providing a key point of contact for advice
and information in relation to pathway planning for
services, whilst also helping improve awareness of
CEYP’s rights, wider rights for children (UNCRC)
and housing’s role as a Corporate Parent.  Progress
in relation to embedding Children’s Rights and
Wellbeing Impact Assessments into housing policy
and strategy has also been implemented since the
publication of the LHS, helping to mitigate adverse
impact and strengthen positive impact for children
and young people.
Actions contained within the RRTP continue to
be progressed, with the Housing First Team well
established and support scaled up over the course
of 2021/22 to increase capacity and reach of the
Housing First service.  As part of the work around
RRTP, we are also exploring development of a
crisis out-of-hours response service, alongside
assertive outreach to help meet the needs of people
who experience crisis and require an immediate
response, which will also support people not
currently linked in with services. A Trauma Informed
Practice Co-ordinator has been recruited to
implement a trauma training plan across the council
and wider partner workforce. So far, 59 housing staff
have been trained in trauma informed approaches,
with a training plan under development which will
incorporate tailored levels of trauma training for all
housing staff.
New policies have been developed
and implemented for tackling
domestic abuse and improving
tenancy sustainment, to help prevent
homelessness and ensure timeous
access to support, information and
advice, and training for staff.
Homes previously earmarked for demolition through
the re-provisioning programme have been brought
back	into	use	to	house	refugees	fleeing	the	war	in	
Ukraine. Thirty two families have moved into the
newly refurbished block at Birkshaw Tower, Wishaw
with an additional twelve families housed by Clyde
Valley Housing Association. The refurbishment of
Highcoats in Coatbridge is making good progress
and will be ready for residents in late January 2023.
Families have settled in well and have access to
a variety of supports including English language
classes, employment support through Routes
to Work, NHS Lanarkshire staff and daily on-
site support from our resettlement team. Work is
ongoing to identify and house additional families
within the towers which will, in total, provide 200
new homes for Ukrainian refugees.
Page 53 of 221

Page 54

12
Local Housing Strategy Annual Progress Report 2022
Specialist provision
PRIORITY 4: WE HAVE A RANGE OF HOUSING OPTIONS AND SUPPORTS WHICH PROMOTE
INDEPENDENCE, HEALTH AND WELLBEING
All new build developments delivered by NLC
incorporate best practice, dementia design
principles to support those living with dementia or
with other support needs, including, but not limited
to:
• different coloured front doors to help with visibility
and navigation
• clearly visible entrances, level access and good
lighting
• clearly visible door numbers and doorbells that
contrast with the wall surface
• extended curtain plates to maximise natural light
from windows
• worktops/flooring	in	clear,	solid	colours	to	avoid	
confusion from pattens or speckles.
The remodelling of our linked corridor retirement
complexes has progressed over the last year, with
work at Dundyvan Gardens linked corridor complex
nearing completion and work at other linked corridor
retirement complexes scoped and planned over a
phased period.  This programme of improvements
in older people’s housing will help provide specialist
housing and communal facilities that enable
independence and promote health and wellbeing,
providing sustainable, future-proofed environments.
Our incentive to downsizing scheme has been
implemented	over	the	last	year,	with	a	financial	
package of assistance provided to tenants
under-occupying properties to help bring larger
homes back into allocation to meet the needs of
family households.  Despite the scheme being
implemented recently, popularity for the scheme is
evident and anticipated to increase as energy costs
and the cost of living continues to rise.  A targeted
communications campaign is planned to further
78 new council homes
suitable for older people
built in 2021/22.
3,137
adaptations
22 new homes built to
wheelchair standard
(15 NLC/ 7 RSL)
389 homes built
to HfVN standards
(total 970 NLC, 1,862
RSL to date)
Page 54 of 221

Page 55

13
Local Housing Strategy Annual Progress Report 2022
increase awareness of the scheme amongst under-
occupying households, helping match housing
better to people’s housing needs.
Adapting for change training has continued to be
delivered via the development of an e-learning
module which is enabling increased access to
training on early intervention to prevent housing
crises from occurring.  The training continues to
be delivered across housing and health and social
care services, encouraging a collaborative approach
to	early	identification	of	housing	issues	to	achieve	
better housing, health and wellbeing outcomes.
New processes have been implemented over
2021/22 to help reduce delayed hospital discharge,
with weekly meetings established which involve all
locality housing, health and social care teams and
hospital discharge coordinators. The technology
flat	continues	to	be	promoted,	with	in-person	visits	
taking place again following Covid-19 restrictions. 
Discussions are ongoing in identifying alternative
accommodation	for	the	resource	flats,	which	
will help further improve options for enabling
swift hospital discharge and preventing delayed
discharge.
The Gypsy Traveller Strategic Group has continued
to make good progress against several key actions
over the course of the last year, with new data
collation methods implemented which helps capture
the housing and support needs of Gypsy Travellers
in North Lanarkshire in unauthorised encampments. 
Work is ongoing with Scottish Government and
COSLA on the national action plan, to develop a
housing need and demand toolkit for assessing
the housing needs of Gypsy Travellers and on
negotiated stopping.  North Lanarkshire Council
housing is represented on the national groups
and coordinates action at a local level through
partnership arrangements.
Engagement with private developers on an all tenure
wheelchair target has taken place, and work is
underway for a residents’ survey to further inform
the evidence base for the target.  Engagement
with developers to increase awareness amongst
developers on the need for wheelchair liveable
housing is planned to continue in 2023 with a view
to setting a target for the delivery of wheelchair
liveable homes in the private sector early in the year. 
Improvements in digital connectivity have been
made, with new smart technology being piloted in
homes which assists with maintenance and lowering
energy consumption, alongside new technologies
showcased in the Tech Flat, which supports
independence, health and wellbeing, improving
awareness amongst staff, services, providers,
people and communities of potential technological
solutions.
Page 55 of 221

Page 56

14
Local Housing Strategy Annual Progress Report 2022
We published our Climate Plan – Act on Climate Together 2030 this year. The document
cements our pledge to achieve net-zero emissions in North Lanarkshire by 2030
and sets out the targets and next steps needed to achieve this. A recent change in
Governance has further embedded the agenda within the organisation, ensuring we
have a 360 perspective on climate change.
Fuel poverty, energy efficiency and
climate change
PRIORITY 5: WE WILL TACKLE CLIMATE CHANGE AND FUEL POVERTY
£275,500 funding received
from Social Housing Net
Zero Heat Fund.
1,045 council homes
fitted	with	new	
heating systems
99.2% of
homes meet
EESSH
100% of council new builds
meet NLC New Build
Sustainability Standards
Average	energy	efficiency	of	our	new	
build homes is currently Band B (above
the national average which is Band D)
Page 56 of 221

Page 57

15
Local Housing Strategy Annual Progress Report 2022
We are reviewing our approach to space and water
heating in our new builds in line with the Scottish
Government’s Heat in Buildings Strategy, published
in October 2021, which sets out the Government’s
aim for all our homes and buildings to be net zero
by 2045. We are exploring both short- and longer-
term options for low emission heating, being mindful
of the potential negative impact these technologies
may have on social tenants due to the higher
running costs.
Construction has begun on 19 ‘Net Zero’ homes
at Dykehead Road, Airdrie which feature a number
of low carbon technologies including air-source
heat pumps, battery storage, enhanced solar PV
arrays and enhanced insulation. The measures are
designed to reduce energy costs for tenants, help
keep carbon-emissions low and help tackle fuel
poverty. It is expected that the homes will all achieve
an ‘A’ Energy Performance Rating. 
The pilot forms part of the larger Dykehead Road
re-provisioning site, where a total of 150 new
homes will be built. Data and tenant feedback will
be collected from both the Net Zero homes and
the homes heated by gas combination boilers.
This will allow us to assess the performance and
future viability of these options to help inform future
investment decisions.
In	2021,	we	installed	our	first	electric	vehicle	
charging points on a new build housing
development at Nobles View, Bellshill. We have
committed to providing an EV charging pillar within
each parking court of our new developments, where
the National Grid has capacity. In addition, we aim to
install individual charging points on each new build
home that has a private driveway.
Other examples of how we’re building greener
include:
• Minimising heat loss by using mineral wool
insulation and windows and doors exceeding
requirements set out in the Building Standards.
• On-site renewable energy. Photovoltaic provision
has recently been increased and homes currently
being built will have an in-roof photovoltaic array
which will reduce CO2 emissions, assist with
running costs for the home, and reduce demand
on the National Grid.
• Energy	efficiency	measures	which	see	over	99%	
of our new build homes achieve a ‘B’ Energy
Efficiency	Rating	and	over	90%	achieve	a	‘B’	EPC	
CO2 Rating.
We have commissioned consultants to develop
a route map to achieving EESSH2 compliance in
our existing social housing stock. The new EESSH
requires that all social housing meets EPC Band
B by the end of 2032, within the limits of cost,
technology and necessary consent. In addition,
no social housing below EPC Band D should be
re-let from December 2025, subject to temporary
specified	exemptions.	Currently	99.2%	of	our	stock	
is EPC Band D or above. This is a 1% improvement
on last year.
Our	drive	to	improve	energy	efficiency	in	our	existing	
council homes has seen us receive a top award for
Large Scale Project of Year at Scotland’s Energy
Efficiency	Awards.	By	installing	measures	such	as	
wall insulation, loft insulation, windows, roof, render,
as well as renewable technologies such as solar
panels, we have helped bring homes up to SHQS
and EESSH standards and reduce fuel poverty for
tenants.
We have been awarded a further £2,242,200 in
2022/23 from the Social Housing Net Zero Heat
Fund for the works to upgrade non-traditionally
constructed homes in Wishaw, Motherwell,
Newmains, Newarthill and Airdrie.
Over 3,000 energy efficiency measures
installed in 2021/22.
External Wall
Insulation
550
Windows
700
Heating
1,700
Solar Panels
130
Page 57 of 221

Page 58

16
Local Housing Strategy Annual Progress Report 2022
Following on from the successful delivery of a
pilot scheme in Pather to install single room heat
recovery fans, we have installed these in our
mainstream programme where appropriate. These
work by extracting and using heat from stale air to
warm fresh air coming into the home, saving energy.
It is hoped that, if successful, this technology will be
rolled out to other properties in the future.
We have delivered around £9.5m of energy
improvements in North Lanarkshire since 2016,
with 1,284 private homes improved. In 2020/21
we upgraded 34 council homes and 35 private
homes through EES:ABS (formerly HEEP:ABS).
Uptake for the scheme has since been affected by
changes in legislation and external funding meaning
a percentage contribution from owners is now
required to carry out the improvement works. It is
anticipated that this will affect uptake for the scheme
going forward, unless there is a change in funding
parameters. Measures are being taken to encourage
owners to participate.
We are also working to encourage energy
improvements in the private sector. Current landlord
registration processes now require that all new and
renewal applications have a suitable EPC for the
property and work is ongoing to ensure compliance
at this stage.
Low-income households at risk of fuel poverty were
supported with almost £1m of funding through the
Tenant Hardship Payment Scheme. In the 6 months
from January to June 2021, more than 8,000
applications were received for the scheme which
was targeted at those at risk of fuel poverty but
unlikely	to	receive	financial	support	elsewhere.	The	
scheme has recently been reviewed with the income
threshold lowered in October 2022, increasing the
reach of the scheme to more working households in
fuel poverty. 
Page 58 of 221

Page 59

17
Local Housing Strategy Annual Progress Report 2022
House condition
PRIORITY 6: OUR HOMES WILL BE FIT FOR THE FUTURE
98.5% of reactive
repairs completed
“right	first	time”
Emergency repairs completed
within 3.18 hours on average
(below Scottish average, and year on year
improvement)
We have invested more than £27m to improve the
quality of our homes over the past year, including
£13 on roof and render, £6.5 on kitchens and
bathrooms, and £4.2m on home safety and security.
Despite a variety of ongoing challenges, including
labour/ material shortages and cost increases, we
still plan to invest over £50m in the coming year2.
The type of works being undertaken this year
include:
• roof upgrades
• external wall insulation
• windows, kitchens and bathrooms
• lift replacements
• lead water pipe replacements
• energy	efficient	heating	systems
• electrical rewiring of houses and common areas
of	low-rise	blocks	of	flats
We continue to invest in our tower blocks to ensure
they are safe, secure and attractive places to live.
Our structural survey programme, which began in
2016 and is now complete, has informed a wide-
ranging	programme	of	works	to	improve	fire	safety	
in our towers. The programme which includes
installation	of	emergency	lighting,	fire-doors	and	
improved	compartmentation/fire-stopping	is	now	
complete. In line with recent change in legislation,
interlinked smoke detection has also been installed
within properties and sheltered complexes.
The programme to install sprinkler systems within
individual properties is also progressing well with the
first	phase	now	complete	and	the	second	phase	on	
track for completion in Winter 2022.
We are nearing completion of the refurbishment of
Blairgrove, Merryston, Glen and Millbrae Towers in
Coatbridge with the installation of parking bays and
charging canopies underway.
Our average days to re-let homes increased to
31.81 days during the year mainly due impact of
the pandemic, however we performed well when
compared to the Scottish average of 51.6 days. Our
housing and repairs teams are working together and
liaising closely with our contractors to continually
improve these timescales with a view to bringing our
performance back to pre-pandemic levels.
Following approval at committee in November
2021, the council will now lead the large-scale
re-provisioning	of	privately	owned	flats	at	Millcroft	
Road, Cumbernauld. Intensive work during 2022
has ensured that all remaining owners have
been traced, concluding this workstream and
allowing	the	CPO	Order	Schedule	to	be	finalised	
and progressed. The Rehousing Strategy is now
underway	with	the	first	voluntary	acquisitions	taking	
place, allowing residents to move to Sanctuary’s
new development at Burns Road.
Non-emergency repairs
completed 30% quicker
than Scottish average (6.19 days)
2 subject to committee approval Page 59 of 221

Page 60

18
Local Housing Strategy Annual Progress Report 2022
Private sector housing
PRIORITY 7: WE CONTRIBUTE TO IMPROVING THE QUALITY AND ACCESSIBILITY OF THE
PRIVATE RENTED SECTOR
We re-established our Private Landlord
Forum	this	year,	the	first	time	the	event	has	
been held since 2017. By holding the event
online, through Microsoft Teams, we have
increased participation and made the event
more accessible for those unable to attend
an in-person event. The event was recorded
and made available on our website, allowing
landlords to access and replay the event at a
time convenient to them.
We hope to further increase engagement through our bi-annual Private Landlord
Newsletter which aims to provide landlords with clear information on their rights
and responsibilities, give relevant updates on policy and legislation changes, as
well as providing guidance on sources of support and assistance.
We	have	made	significant	progress	reviewing	and	redesigning	our	Landlord	
Registration processes and procedures. Initially this work has focussed on how
we approach landlords whose registration has expired but work also continues
in other areas of the registration process such as application and audit/
enforcement of regulations.
Our	Private	Sector	Officers	carried	out	several	hundred	inspections	in	support	
of the Ukrainian Re-settlement Programme, ensuring the properties of those
applying	to	the	Programme	were	of	a	suitable	standard	and	fit	to	house	those	
arriving from Ukraine.
We await publication of the new Rented Sector Strategy which is expected
to provide improved data on the Private Rented Sector. In the interim, we will
undertake further analysis using Home Analytics Data, as well as collaborative
efforts with the Private Sector Team to improve understanding.
We are planning research with NHS Lanarkshire and larger employers within
North Lanarkshire to establish gaps and demand for tenures such as Mid-
Market Rent, Shared Equity and Low Cost Home Ownership.  This will be
progressed in partnership with the Growth Team.
8,397 Registered Landlords
12,809 Approved Properties
Private landlord forum re-
established
Page 60 of 221

Page 61

19
Local Housing Strategy Annual Progress Report 2022
Strategic Housing Outcome 1: We increase the supply of high-quality sustainable homes across tenures
Action Baseline
2019/20
Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator
2021/22
KEY ACTION 1.1
Deliver alternative tenure housing
to meet a broad range of needs and
deliver sustainable, inclusive and
diverse communities
38 mid-market
homes delivered
to date
Enable RSLs to deliver Mid Market Homes in large
council developments to provide more mixed
tenure, sustainable and diverse communities and
support town visions and regeneration projects 3
Deliver Mid Market
Homes
NS Ongoing Number of MMR
homes in council
developments
Ongoing 25 MMR homes included in 2023/24-2027/28
SHIP.
-
Initial feasibility
report
Re-visit initial feasbility studies to determine
viability of council delivery of MMR
Re-freshed feasibility
study
BDS/NS 2023 Report Complete Refreshed feasibility study and financial modelling
complete. Council delivery of MMR remains
financially unviable despite new subsidy from
Scottish Government for council delivery of MMR.
- Establish a Housing Delivery Partnership to deliver
MMR and other alternative tenure to ensure
readiness should market conditions allow for
council delivery of alternative tenure
Establish HDP NS/BDS 2022 HDP established Ongoing Exploration of Housing Delivery Partnership
ongoing.  Council delivery of MMR remains
financially unviable but scope exists potentially
through the Town Centre Project and Levelling Up
Agenda to deliver mixed tenure within Town Centre
locations.
Initial feasibility
report
Explore use of Affordable Housing Policy to deliver
shared equity housing
Complete options
report
BDS/NS 2022 Report Complete The Affordable Housing Policy Supplementary
Planning Guidance is currently under review
following adoption of North Lanarkshire’s Local
Development Plan in 2022. The revised Affordable
Housing Policy SPG contains provision for Shared
Equity housing as a delivery option. A separate
options report on the delivery of Shared Equity
housing is also complete.
Initial
discussions held
Explore Build to Rent feasibility Build to Rent explored NS/BDS Ongoing Report Ongoing Initial discussions held with developers.
- Carry out engagement and analysis with key
workers and employers to identify further the future
housing needs of key workers
Engagement and
Analysis complete
BDS 2023 Engagement and
Analysis Report
Not yet
started
Not yet started. Engagement to be carried out
early 2023.
- Develop a self-build register to be published on the
council’s website
Self-build register
developed and
published
BDS/Pl 2022 Register Ongoing Initial discussions held.
- Consider ways in which planning policy and use of
public land can support delivery of self-build
Methods considered BDS/Pl 2022 Report Ongoing Ongoing
KEY ACTION 1.2
Improve our strategic understanding
of Covid-19 on housing need and
aspirations
- Undertake further analysis of housing needs and
aspirations as further evidence and data emerges
Analysis complete BDS Ongoing Analysis report Complete Research complete on impact of Covid-19 on
housing needs and aspirations.
3 This milestone has been revised to ‘enable RSLs to deliver Mid Market Rent Homes to provide more mixed tenure, sustainable and diverse communities and support town visions and regenerations projects’.
Page 61 of 221

Page 62

20
Local Housing Strategy Annual Progress Report 2022
Strategic Housing Outcome 1: We increase the supply of high-quality sustainable homes across tenures
Action Baseline
2019/20
Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator 2021/22
KEY ACTION 1.3
Contribute to the strategic planning
for housing in Glasgow and Clyde
Valley
HNDA2 Contribute to Housing Need
and Demand Assessment 3
Completion of HNA3 BDS 2021/22 HNDA3 Ongoing HNDA 3 sign-off in process and anticipated submission to
CHMA prior to year end for assessment for 'robust and credible'
status. Thereafter further discussion required on Housing Supply
Targets, and refresh of the current LHS.  Anticipated Spring
2023.
HLR 2021
(under
consultation)
Land available for private
sector Housing Supply
Target (HST)
759 units per annum
(based on HNDA2 to
be updated to reflect
HNDA3)
Pl 2026 HLA Ongoing 857 units per annum (based on HNDA2 to be updated to reflect
HNDA3)
HLR 2021
(under
consultation)
Land available for social
rented/below market rent
sector HST
300 units per annum
(based on HNDA2 to
be updated to reflect
HNDA3)
Pl 2026 HLA Ongoing 242 units per annum  (based on HNDA2 to be updated to reflect
HNDA3)
HLR 2021
(under
consultation)
Land available for all tenure
HST
1,059 units
(based on HNDA2 to
be updated to reflect
HNDA3)
Pl 2026 HLA Ongoing 1,099 units (based on HNDA2 to be updated to reflect HNDA3)
KEY ACTION 1.4
Maximise provision of affordable
homes, to meet a range of housing
needs
SHIP 2021/22
– 2025/26
Review and update
the Strategic Housing
Investment Plan (SHIP)
annually
SHIP updated annually NS/BDS Annually SHIP Complete Produced annually. SHIP 2022/23-
2026/27 submitted
to Scottish
Government
October 2022.
2024 council
and RSL units
delivered since
2010
Deliver Affordable Housing
Supply Target identified in
HNDA3
300 units per annum
but subject to change
following progression
of HNDA3
NS 2026 Number of
affordable homes
Ongoing 2,796 council and RSL units delivered since 2010. 389 units delivered
in 2021/22 (NLC =
137; RSLs = 252).
- Identify mismatch of supply
and demand in social
rented housing to inform
investment priorities (linked
to the council’s asset
management plan)
Analysis undertaken BDS 2026 Low demand
analysis and
additional reports
Ongoing Housing Asset Management Database and Indicator System
created, which captures a range of information on various
aspects to help better inform demand and investment decisions.
Work currently underway in relation to testing assumptions
before weightings implemented and initial conclusions drawn.
KEY ACTION 1.5
Evaluate the impact of the Affordable
Housing Policy to further understand
impact
- Undertake evaluation of the
Affordable Housing Policy
Evaluation complete BDS/NS 2023 Evaluation report Ongoing Affordable Housing Policy SPG underway which outlines a 20%
AHP policy contribution in the Cumbernauld HSMA in line with
the new Local Development Plan for North Lanarkshire. Some
initial analysis undertaken on pressure analysis in the North to
further understand impact of AHP on pressure.
Page 62 of 221

Page 63

21
Local Housing Strategy Annual Progress Report 2022
Strategic Housing Outcome 2: Our communities are vibrant, attractive and sustainable
Action Baseline 2019/20 Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator
2021/22
KEY ACTION 2.1
Help re-shape and
populate our town centres
Town visions developed and
engagement ongoing
Identify and deliver
transformative town centre
projects to provide new
residential provision
• Kildonan St, Coatbridge
• Bank St, Airdrie
• Motherwell Town Hall
• Former Tesco Site, Wishaw
• Broomknoll St, Airdrie
• John Orrs Building,
Southbridge St, Airdrie
Complete projects NS 2026 Number of
projects complete
Ongoing The Whitehouse and Bromknoll Church complete. Former Tesco
site due for handover Jan/ Feb 2023. Orrs in progress.
Bank Street:
Due to the high costs of retaining the façade, and its close
proximity to the railway line leading to construction complexities,
it was decided at Board level to redesign the proposals and
seek permission from planning and Historic Environment
Scotland to remove the façade in favour of a complete new build
design. This is a more favourable design in terms of buildability,
functionality as well as being more economical. A new planning
application is being developed with submission expected in
Spring 2023. The proposals consist of 6 flatted homes for social
rent as well as supported accommodation.
Kildonan Street:
Stage 2 designs were valued higher than the expected value
approved at the committee in March 2020. Costs have
increased largely due to inflation, but also due to the revised
energy strategy required to meet the higher building regulations
for housing. In order to reduce the total costs towards the
agreed value of the project, and to deliver on the main objective
to refurbish and re-purpose the municipal building, it was
decided at Board Level to omit the 6 town houses. The footprint
of the town houses is instead planned to be a mixture of car
parking and a landscaped community garden (including planters)
for the residents to maintain. The current plans include 43 flats
for social rent and a large office space in the main building to
be utilised by the Council as part of its new HUB strategy for
Coatbridge. Planning submission is expected in 2023.
2 sites complete.
Engagement on town hubs
commenced
Develop town centre and
community hubs to support
the delivery of public
services and provide flexible
space
Complete hubs GT 2026 Number of town
centre hubs
Ongoing Community Hub progress:
Newmains/St Brigid's Community Hub, Wishaw will be compete
Q1 2023.
Chryston Community Hub (Northern Corridor) and Riverbank
Community Hub (Coatbridge) will be complete Q3 2023. 
Town Hub Progress:
There is insufficient funding in current five year capital plan to
progress a town hub. However, they are still planned to progress
within the programme as and when funding becomes available.
3 sites in
construction.
Page 63 of 221

Page 64

22
Local Housing Strategy Annual Progress Report 2022
Strategic Housing Outcome 2: Our communities are vibrant, attractive and sustainable
Action Baseline 2019/20 Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator
2021/22
KEY ACTION 2.2
Improve connectivity of
our communities through
investing in physical, social
and digital infrastructure
Progress made on
Ravenscraig Access Road
Deliver the City Deal
Programme
Projects complete GT 2026 Projects Ongoing RIA S FBC 1 approved for West Coast Mainline Crossing.  WCML
works on site and ahead of programme. 
RIA N Multidisciplinary Services contract Awarded and detailed
design in well underway.  
Tender for RIA S FBC 2 Dual Carriageway and new junction
(roundabout) in development.
WCML complete
May 23.
Connecting NL – a
Blueprint Project
Deliver new opportunities for
active and sustainable travel
New opportunities
identified
GT 2026 Active Travel
Strategy
Ongoing Logans Road: complete                                                     
The Loaning Stages 1-3: complete                             
Strathclyde Park: complete                                             
Minch Way: complete                                                       
A71 Horsley Brae: complete                                            
Newhouse to Salsburgh: substantially complete          
South Biggar Rd/ Craigneuk Ave: substantially complete
Petersburn Road/ Brownsburn Rd: design 90% complete                                            
Meadowhead Road: public consultation complete     
Alexander St: works tendered
8 projects
completed.
Implement fast, affordable
digital connectivity for
businesses and communities
Improved digital
connectivity
BS 2026 Number of
people digitally
connected
Ongoing Comms World partner now in place to progress implementation
of faster digital connectivity.
Fibre to the Premise and
Cat5e ethernet cabling
provided in council new
build homes
Continue to deliver digital
connectivity within new build
council homes
All council new build
homes delivered
will have digital
infrastructure
NS Ongoing Number of new
council homes
with digital
infrastructure
On Track Ongoing 137 council new
builds delivered
with digital
infrastructure.
KEY ACTION 2.3
Improve economic
opportunities and
outcomes for all
Economic Regeneration
Plan approved
Progress actions contained
within North Lanarkshire’s
Economic Regeneration Plan
(2019-23)
Actions complete NS/
GT/
BDS
2023 Annual review Ongoing 2021/22 Action Plan developed and predominantly delivered
(reported to committee August 2022). 2022/23 Action Plan in
progress.
KEY ACTION 2.4
Develop and deliver the
Tower Re-provisioning
Programme
3 tower blocks demolished
(Cheviot, Merrick and
Pentland Court)
Deliver Phase One
comprising 1,760
demolitions with sites
cleared for future investment
1,760 demolitions HP/NS 2026 Number of
demolitions
On Track Demolition of Coursington, Allan and Draffen Towers
(Motherwell) and Shawhead flats (Coatbridge) in progress.
Remaining sites at Gowkthrapple and Coatbridge on track for
demolition by 2025 target.
209 demolished
to date.
Phase Two developed for
implementation from 2025
Programme developed HP/NS 2024 Programme Ongoing Options for Phase 2 are currently being considered using
findings from the structural survey, demand analysis and the
availability of housing for re-provisioning.
Page 64 of 221

Page 65

23
Local Housing Strategy Annual Progress Report 2022
Strategic Housing Outcome 2: Our communities are vibrant, attractive and sustainable
Action Baseline 2019/20 Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator
2021/22
KEY ACTION 2.5
Invest in council multi-
storey towers to ensure
continued safety and
security of tenants
Programme underway Continue to review
and implement where
appropriate fire stopping
and prevention measures
and re-cladding in multi-
storey towers
Works complete HP 2026 Progress reports Ongoing Fire doors and fire stopping works to all towers outwith the
Phase 1 demolition programme and 4 towers upgrade project
complete. Cladding replacement programme progressing at the
4 Towers in Coatbridge (Blairgrove / Merryston / Glen / Millbrae)
and designs team to be agreed for Whifflet / Calder.
KEY ACTION 2.6
Implement the Place-
Standard Tool across a
wider range of settings
Place-Standard Tool in use Incorporate use of the
Place-Standard Tool
in tenant participation
settings to identify areas of
improvement and improve
place
Place-Standard Tool
in use across tenant
participation groups
BDS 2023 Tenant
Participation
reports
Ongoing Ongoing
Implement use of the
Place-Standard Tool
in existing and future
housing consultation and
involvement opportunities
i.e. tenants conference,
housing forums etc.
Place-Standard Tool
used across the
range of housing
consultation activities
BDS 2024 Consultation
reports
Ongoing Ongoing
KEY ACTION 2.7
Incorporate the twenty-
minute neighbourhood into
community development
Further implement
high-quality 20 minute
neighbourhoods in North
Lanarkshire focussed on
provison of physical, digital
and social infrastructure
and mapping and review of
provision
High-quality
20 minute
neighbourhoods
implemented
BDS 2026 Report Ongoing Creation of 20-minute neighbourhoods with good access
to physical, digital and social infrastructure continues to be
progressed through several ways. This includes the Town Centre
Visions, the Active Travel Strategy, the creation of Town and
Community Hubs as well as the New Supply Programme, which
includes the expansion of the Open Market Purchase Scheme
to increase supply whilst addressing important issues such as
prevention of homelessness, mixed tenure repairs to improve
housing condition, as well as tackling the blight of empty homes
in communities. The new Local Development Plan has been
adopted in 2022, which also sets out the Placemaking Policies
which help create 20 minute neighbourhoods.
KEY ACTION 2.8
Increase the number of
empty homes brought back
into use
197 empty homes
purchased since scheme
established
Continue to deliver the
Empty Homes Purchase
Scheme
30 per annum NS 2026 Number of empty
homes purchased
On Track 285 empty homes purchased since scheme established. 41 empty homes
purchased in
2021/22
116 empty homes brought
back into use via the
empty homes officer since
2018-19
Continue to work with
owners and partners to
bring empty homes back
into use
35 per annum PS Ongoing Number of empty
homes brought
back into use
On Track 157 private sector empty homes brought back into use since
2018
41 private sector
empty homes back
in use in 2021/22
Page 65 of 221

Page 66

24
Local Housing Strategy Annual Progress Report 2022
Strategic Housing Outcome 2: Our communities are vibrant, attractive and sustainable
Action Baseline 2019/20 Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator
2021/22
KEY ACTION 2.9
Tackle low demand within
council stock
Low Demand Analysis
complete 2019/20
Update Low Demand
Analysis and action plan
annually
Complete analysis BDS Ongoing Low demand
report
Ongoing Pressure analysis completed annually. Action plan to be
informed by HAMP Database analysis. Quarterly analysis also
completed for the Tower Re-provisioning Programme.
Identify options to address
low demand stock
Options identified BDS Ongoing Options appraisal Ongoing Considered through the Re-provisioning Programme.
Strategic Housing Outcome 3: We prevent and resolve homelessness effectively
Action Baseline 2019/20 Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator 2021/22
KEY ACTION 3.1
Implement the RRTP
Homes First model
developed
Develop and implement
Homes First service
Homes First Service
implemented
BDS
HS/
H&SC/
2025 Number of people
accessing Homes First
service
On Track 48 Homes First individuals now being supported - 40 now
sustaining tenancies
8 individuals
awaiting suitable
rehousing
Forever Homes project
established
Carry out evaluation of
‘Forever Homes’ project
Evaluation complete HS/BDS 2023 Evaluation report On Track Second feedback survey complete August 2022. Homes First co-
production report
2022 complete.
Protocols in place Review shared protocols
for young care experienced
people and domestic abuse
Protocols reviewed HS/
BDS/
H&SC
2022 Revised Protocols Complete CEYP protocol reviewed and revised in partnership with
Health and Social Care. Domestic Abuse Protocol updated
and new Housing Domestic Abuse Policy developed and
implemented.
5 homeless young care
leavers
Number of homeless
young care experienced
people
On Track 1 YP homeless straight form a care setting in 2021/22. Continue to monitor
29% of homeless
presentations disputes
within household
(14.8% non-violent and
14.2%% violent)
Number of people
homeless due to domestic
abuse
Ongoing 246 (14.56%) homeless applicants identified an abusive
relationship in 2021/22.
Continue to monitor
- Number of people housing
services refer/signpost for
domestic abuse support
Ongoing 263 people referred
for domestic abuse
support.
105 homeless people
discharged from prison
Implement SHORE
standards
SHORE standards
implemented
BDS/
HS/
H&SC
2023 Number of homeless
people discharge from
prison
On Track 75 (4.4%) in 2021/22 Continue to monitor
Joint protocol and
procedure
Complete Process developed between PP Team and Operational
Housing to support needs of SHORE. No request made to
develop protocol as we are working within Shore Standards.
Page 66 of 221

Page 67

25
Local Housing Strategy Annual Progress Report 2022
Strategic Housing Outcome 3: We prevent and resolve homelessness effectively
Action Baseline 2019/20 Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator 2021/22
KEY ACTION 3.1
Implement the RRTP
- Explore viability of
specific services to
support women with
poor mental health
and addictions
Services explored BDS/
H&SC
2024 Options report Ongoing Housing is represented on the Violence
Against Women Strategic and Operational
Partnership Groups, which have a key role in the
commissioning of services to meet needs.  Family
Plus Service established in partnership with
Barnardo's Scotland, funded by the ADP, which
provides housing support to families and young
people affected by domestic abuse, addictions and
other trauma.
Discussions
underway with RSL
partners
Agree and monitor
target lets for RSLs to
homeless households
Targets agreed and
monitoring system
in place
BDS/
HS/
RSLs
2022 Number of RSL homeless
household lets
On Track First RSL meeting held August 2022 to encourage
increase in % lets. New contacts established for
NLC & RSLs.
Continue to monitor
RRTP developed
and being
implemented
Prevent homelessness
from occurring and
where it does occur
resolve effectively
Homelessness
prevented, reduced
and resolved
HS/BDS Ongoing RRTP progress reports On Track Monthly RRTP RAG report in place. Flipped
tenancies declined in recent months.
8 tenancies flipped YTD. Report
circulated to localities quarterly to
increase
2,127 homeless
applications
Number of homeless
applications
On Track 1,697 homeless applications
192 assessed as
‘not’ homeless
Number of people
assessed as ‘not
homeless’
On Track 58 assessed as 'Not Homeless' in
2021/22. This was a fall from 71 in
2020/21 and 127 in 2019/20.
197 assessed
as ‘intentionally
homeless’
Number of people
assessed as ‘intentionally
homeless’
On Track 44 assessed as 'intentionally
homeless' which is a significant fall
since 2019/20 but is also reflective of
a 21% fall in Hl applications.
120 repeat
homeless
applications
Number of repeat
homeless applications
On Track 60 repeat homeless cases in 2021/22
which is a fall of 31 from 2020/21
when 90 repeat cases were recorded.
KEY ACTION 3.2
Review housing options
and prevention activity
S11 procedure in
place
Review S11 process
and procedures
S11 process and
procedures reviewed
BDS 2023 Number of S11
notifications
Complete Section 11 processes/ procedures reviewed in
2021 as part of RRTP Action Plan.
Continue to monitor
Development of
Housing Options
Toolkit underway
Deliver the Housing
Options Training
Toolkit
Housing Options
Training Toolkit
operational
BDS 2022 Housing Options Training
Toolkit
On Track 5 of 6 modules now complete - module 4 50%
complete. M1 to 3 already live and being used by
32 authorities and GHA.
Number of PAS
interviews leading
to homeless
applications –
65.4%
Embed new
approaches and good
practice for prevention
activity
Improved practice BDS/
HS
2024 Case Audits Ongoing PAS re-launched 2020-2021 with all staff briefed
re proper use of PAS. Monthly Monitoring reports
introduced to MCO.
Cleansing exercise being completed
Nov 2022-Feb 2023.  Improved use,
better auditing and reporting to be
developed. Action Plan underway
2022.
Page 67 of 221

Page 68

26
Local Housing Strategy Annual Progress Report 2022
Strategic Housing Outcome 3: We prevent and resolve homelessness effectively
Action Baseline 2019/20 Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator 2021/22
KEY ACTION 3.3
Improve housing support
and accommodation
services meet the needs
of homeless households
Housing support
services
commissioned
Re-design of housing support
services to meet needs and align
with RRTP
Re-design and
re-tender housing
support services
BDS 2024 Options appraisal and
Tender
On Track Re-design of Housing Support Services to
commence during 2023. 
83.9% of new
tenancies sustained
for more than a
year by source of let
(homelessness)
% of new tenancies
sustained for more than
a year by source of let
(homelessness)
Ongoing 2021/22 outturn was 87.61% of tenancies
sustained. This is a 3.71% improvement on the
2019 baseline.
Continue to monitor
87.3% of new
tenancies sustained
for more than a
year by source of
let (all waiting lists
combined)
% of new tenancies
sustained for more than
a year by source of let (all
waiting lists combined)
Ongoing 2021/22 outturn was 90.92% of tenancies
sustained. This is a 3.62% improvement on the
2019 baseline.
Continue to monitor
Review commenced Carry out temporary
accommodation review
Review complete BDS 2023 Temporary
accommodation strategy
Ongoing Initial modelling work on Temporary
Accommodation Strategy carried out but impacted
by Covid-19 in relation to reduced allocations and
increased void times. Modelling work to resume in
2023 to identify recommendations for temporary
accommodation, linked to RRTP.
Strategic Housing Outcome 4: There are a range of housing options and supports which promote independence, health and wellbeing
Action Baseline 2019/20 Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator 2021/22
KEY ACTION 4.1
Increase the supply of
affordable wheelchair
housing.
43 new build
council wheelchair
homes built
Deliver wheelchair housing on
all council new developments
where feasible (where not feasible
provision should be increased on
other sites to achieve minimum
target)
10% NS 2026 Number/percentage of
council new build homes
built to wheelchair liveable
standard
On Track 61 new build council wheelchair homes built to
date.
15 new build council
wheelchair homes built in
2021/22 (11% of annual
council new builds)
32 new build RSL
wheelchair homes
built
Deliver wheelchair housing on
all RSL new build developments
where feasible (where not feasible
provision should be increased on
other sites to achieve minimum
target)
5% RSLs 2026 Number/percentage of
RSL new build homes
built to wheelchair liveable
standard
Slightly
behind
39 new build RSL wheelchair homes built to date. 7 new build RSL
wheelchair homes built in
2021/22 (3% of annual
RSL new builds)
Carry out review/ cost analysis
of council new build amenity
bungalows to determine scope
for increasing standard to full
wheelchair liveable standard
Review complete NS 2022 Review report Complete Cost comparison complete, estimated £20-25k
increase per unit.
Page 68 of 221

Page 69

27
Local Housing Strategy Annual Progress Report 2022
Strategic Housing Outcome 4: There are a range of housing options and supports which promote independence, health and wellbeing
Action Baseline 2019/20 Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator 2021/22
KEY ACTION 4.2
Increase the supply of
wheelchair housing in
the private sector
- Engage and work with private
developers to increase awareness
of the need for wheelchair
accessible and liveable housing
and encourage development
*target to be
determined following
engagement with
developers
BDS 2022 Private Developer
Consultation Complete
Complete Consultation carried out with developers on the
delivery of wheelchair homes and potential target
approach.
2022 Target agreed Slightly
behind
Survey planned for tenants and residents in late
2022 to gather further information on needs to
supplement existing information on need and
demand, in addition to further engagement with
developers with a view to implementing a target
in 2023.
2022 Mechanisms in place to
monitor delivery
Complete Mechanisms for monitoring via LHS progress
reporting.
KEY ACTION 4.3
Increase the supply
of adaptable and
accessible housing
640 council new
build social rented
(HfVN) homes
(2019); 1,384 RSL
social rented (HfVN)
homes built (2019)
Deliver housing for varying needs
through the council and RSL new
build programme
5,000 by 2035 NS/
RSLs
2026 Number/percentage of
council and RSL homes
built to ‘Housing for
Varying Needs Standards’
On Track 934 council new build and 1,862 RSL new build
meeting HfVN standards to date.
389 homes built to HfVN
standards in 2021/22 (NLC
= 137; RSLs = 252).
3,463 adaptations
completed in
2019/20
Provide equipment and
adaptations across tenure
Increase H&SC 2026 Number of adaptations
and equipment provided
Ongoing 3,137 adaptations
complete across tenure.
Carry out analysis to identify
future demand for equipment and
adaptations in partnership with
health and social care
Analysis complete
and needs identified
BDS/
H&SC
2024 Analysis report Ongoing Data on equipment and adaptations provision
reported quarterly. Analysis not yet started,
although planned as part of further joint
assessment of needs with Health and Social Care.
KEY ACTION 4.4
Increase the supply of
older people’s housing
2,501 older people
homes (NLC and
RSL)
Deliver amenity housing in council
new build developments
Increase NS 2026 Number of new council
amenity homes built
On Track 78 new council homes
suitable for older people
(amenity & WC) built in
2021/22.
2,501 older people
homes (NLC and
RSL)
Deliver amenity housing in RSL
new build developments
Increase NS 2026 Number of new RSL
amenity homes built
On Track Improved monitoring arrangements planned for
2022/23.
Initial feasibility
exercise underway
Explore feasibility of delivering
shared equity for older people
linked to the Affordable Housing
Policy
Feasibility exercise
complete and
recommendations
made
BDS/
NS
2022 Feasibility and
recommendations report
Complete Feasibility report complete and Shared Equity
Housing provision set out within the Affordable
Housing Policy Supplementary Planning Guidance
as a delivery option with Cumbernauld HSMA area. 
Page 69 of 221

Page 70

28
Local Housing Strategy Annual Progress Report 2022
Strategic Housing Outcome 4: There are a range of housing options and supports which promote independence, health and wellbeing
Action Baseline 2019/20 Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator
2021/22
KEY ACTION 4.5
Improve the suitability
of existing housing to
meet the needs of older
people
Tender approved Complete the re-modelling/ refurbishment of
Dundyvan Gardens linked corridor retirement
complex
Remodelling
complete
HP 2022 Progress reports Complete Project complete as at October 2022 and in defects
liability stage.
Initial options
appraisal complete
Carry out options appraisal for remaining
linked corridor retirement complexes
Options appraisal
complete
BDS/
HP
2024 Options appraisal report Ongoing Initial assessment of linked corridor complexes
complete with recommendations identified for
investment. Further options appraisal exercise to
take place using supplementary indicator information
to inform investment decisions and priorities.- Develop investment strategy for linked
corridor retirement complexes to improve
long-term sustainability
Investment strategy
complete
BDS/
HP
2025 Investment strategy Ongoing
- Identify new fire safety and prevention
measures for implementation in retirement
housing linked to the new Fire Safety
Guidance for Specialist Housing
Fire prevention and
safety measures
identified and
implemented
HP 2026 Fire Safety
Recommendation Report
and Implementation
Progress Updates
Ongoing Recommendations have been reviewed and a
programme of works is currently being developed
- Implement downsizing incentives and support
to help older people down-size to more
suitable housing
Allocation policy
revised and
downsizing incentive
scheme implemented
HS 2022 Number of older people
assisted to down-size
Complete Allocation policy reviewed to increase level of priority
to households underoccupying social housing.
Incentive payment rolled out in July 2022.
Figures not
yet available.
- Carry out evaluation of impact of re-
classification of sheltered housing in meeting
needs
Evaluation complete BDS 2024 Evaluation report Ongoing Evaluation planned in 2023/2024 to enable sufficient
time for the new older people's housing model to
embed.
- Carry out review of RSL housing support for
sheltered housing and very sheltered housing
Review complete H&SC 2024 Review report Ongoing Not yet started.
Page 70 of 221

Page 71

29
Local Housing Strategy Annual Progress Report 2022
Strategic Housing Outcome 4: There are a range of housing options and supports which promote independence, health and wellbeing
Action Baseline 2019/20 Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator
2021/22
KEY ACTION 4.6
Improve access to
specialist housing
Development of
housing options
training toolkit
underway
Incorporate specific housing options
information in relation to specialist provision
within the housing options training toolkit
Housing Options
Training toolkit
complete and rolled
out to staff
BDS 2023 Toolkit modular
progress updates
Ongoing Housing Options Toolkit has been rolled out to housing staff
within NLC. NLC continue to take a proactive lead role in the
development of the final component learning pathways and
ongoing learning impact assessment and review.  Recruitment of
Housing Options Toolkit Co-ordinator underway via the Scottish
Housing Network and Memorandum of Understanding agreed for
SHN to take forward the regular maintenance and updating of
the Toolkit going forward.
‘Making Life Easier’
developed with
some housing
information
incorporated
Incorporate further housing information in
‘Making Life Easier’
‘Making Life Easier’
updated
BDS 2024 Number of people
accessing ‘Making
Life Easier’
Ongoing MLE now includes some housing information. This will be
reviewed going forward and updated as required.
- Increase awareness amongst housing staff
of the wider opportunities in MLE for health
and wellbeing to encourage wider ‘good
conversations’ at service contact points by
housing staff around health and wellbeing
Awareness increased BDS 2024 Number of people
accessing ‘Making
Life Easier’
Complete Adapting for Change e-learning module created which includes
information on MLE and housing staff encouraged to complete. 
Pilot of ‘Adapting
for Change’ training
carried out
Progress ‘Adapting for Change’ bespoke
North Lanarkshire e-learning module and
group training to increase awareness of
prevention and early intervention
E-learning module
developed and rolled
out to staff
BDS/
H&SC
2024 Number of staff
completing training
Complete Adapting for Change bespoke North Lanarkshire e-learning
module developed and implemented. Group training carried out
pre-Covid.
KEY ACTION 4.7
Improve the use
of technology
to help enable
independence,
inclusion and
promote better
outcomes
Working group
established to
progress pilot
Complete SMART Homes pilot in Kerr Grieve
Court to identify potential technology options
for older people’s housing
Pilot complete BDS 2025 Smart Home Pilot
report
Ongoing Project was put on hold due to Covid and then was taken forward
by Health & Social Care. The showcase tech was later installed
into Allershaw Tower.
Initial scoping
exercise carried out
Develop interactive SMART Home standard
for council new build homes to ensure digital
infrastructure supports telecare, telehealth
and digital connectivity requirements for the
future
Standard developed NS 2026 New build technology
report
Ongoing Cat 5e cabling installed as standard in all council new build
homes which supports a range of technology and telecare to
support independence, health and wellbeing.  Work ongoing
to identify and test technology options as advancements in
technology progess.
Digital NL underway Engage in the Digital NL developments and
Digital Health and Care Strategy
Completion of Digital
NL
BDS 2026 Digital NL Strategy Ongoing Digital work ongoing independently of Health & Social Care.
‘Tech flat’
developed
Increase awareness and use of technology by
promoting the ‘tech flat’
Increase tech flat
viewings
BDS/
H&SC
2026 Number of people
visiting the ‘tech flat’
Ongoing Tech flat closed for a period of time due to Covid-19 restrictions.
Expected that numbers will increase in future years.
90 visitors
since
LHS was
published.
Working group
established
Transition from analogue to digital alarm
services across older people’s housing
Digital transition
complete
BDS/
HP
2026 Progress reports Ongoing Programme being developed and expecting to commence in
2022/23.
Page 71 of 221

Page 72

30
Local Housing Strategy Annual Progress Report 2022
Strategic Housing Outcome 4: There are a range of housing options and supports which promote independence, health and wellbeing
Action Baseline 2019/20 Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator 2021/22
KEY ACTION 4.8
Enable swifter
discharge from
hospital and reduce
delayed discharge
Weekly meetings
established
Establish and maintain housing representation
at weekly discharge meetings to prevent
and resolve any housing related delayed
discharges
Maintain
representation and
identify solutions
HS 2026 Number of delayed
discharges
Complete Housing representation established at weekly
discharge meetings.
Resource flats
in place across
3 retirement
complexes
Replace resource flats within retirement
complexes with mainstream accommodation
to meet a broader range of hospital discharge
related needs
Replace flats
with alternative
mainstream
accommodation
BDS/
HS
2023 Resource flat
replacements
Ongoing Sourcing of replacement flats underway.
Monitoring system
in place with H&SC
review required
Monitor efficacy of resource flats in meeting
needs
Monitoring system
in place
BDS/
H&SC
2026 Number of people
accessing resource
flats
Ongoing Robust monitoring systems to be implemented when
replacement flats identified.
KEY ACTION 4.9
Improve our
understanding of
the housing and
related support
needs of ethnic
minority groups
and others who
experience
disadvantage and
inequality
- Implement collation of equality monitoring
information across tenants' and residents’
groups and people involved in tenant
participation processes
Equality monitoring
system in place and
analysis undertaken
BDS 2023 Monitoring report Ongoing Equality monitoring data template created and plans to
implement early 2023.
Ethnicity, Age and
Disability currently
gathered
Revise the Common Housing Register
Form to include collation of other protected
characteristics information
Common Housing
Register Form
revised
BDS 2023 Common Housing
Register Form
Ongoing Guidance reviewed and consistent approach to
questions agreed with Corporate equalities rep. IT
project required to enable storing and reporting of the
protected characteristics.
Online form
is currently in
development,
changes will be
requested to
incorporate the
requirements.
Corporate Equalities
Group established
Participate in the council’s Corporate
Equalities Group
Continuous
participation
BDS 2026 Meetings held Ongoing Housing represented on Council Equalities Structures
as required.
Housing Co-
production Group
established since
2010
Continue the Housing Co-production Group
and explore expansion of the group to
incorporate more members from under-
represented groups
Continue and expand
the Housing Co-
production group
BDS 2026 Housing Co-
production Group
meetings
Ongoing Covid-19 has had a significant impact on participation
of the Housing Co-production Group, with membership
declining. Further work planned to increase awareness
of the group, opportunities and increase membership.
LGBT module
developed
Ensure housing staff complete LGBT training
module to improve awareness of barriers
and improve housing information, advice and
support
All housing staff
complete training
BDS 2024 Number of staff
completing training
Ongoing 47 staff completed
training as of 19th
October 2022.
Pilots underway
across 3 local
authority areas
Explore negotiated stopping for Gypsy
Travellers
Negotiated stopping
procedure explored
and implemented if
feasible
BDS 2025 Negotiated Pilot
report
Ongoing Negotiated Stopping pilot ongoing with SG with
recommendations planned for Spring 2023. NLC
continue to explore negotiated stopping as part of the
Corporate Gypsy Traveller Group.
Page 72 of 221

Page 73

31
Local Housing Strategy Annual Progress Report 2022
Strategic Housing Outcome 4: There are a range of housing options and supports which promote independence, health and wellbeing
Action Baseline 2019/20 Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator 2021/22
(cont.) KEY
ACTION 4.9
Improve our
understanding of
the housing and
related support
needs of ethnic
minority groups
and others who
experience
disadvantage and
inequality
Action plan
developed
Progress the actions contained within the
Gypsy Traveller Action Plan to improve
outcomes for Gypsy Travellers in North
Lanarkshire
Completion of actions BDS 2026 Action plan progress
reports
Ongoing Actions progressed as outlined in the Gypsy Traveller
Action Plan with bi-annual updates provided on
progress.
Violence Against
Women Group
established
Work with the Violence Against Women Group
to develop a Violence Against Women Strategy
Strategy complete BDS 2024 Meetings held and
progress reports
Ongoing Violence Against Women Draft Strategy developed. 
Pending approval.
‘Safe and Together’
training currently
provided to H&SC
staff
Roll out ‘Safe and Together’ training for
housing staff
Staff trained BDS 2024 Number of staff
trained
Ongoing Safe and Together Training rolled out to housing staff. 65 staff completed
training as of 14
November 2022.
DAART e-learning
now available
on the council’s
e-learning platform
Roll out Domestic Abuse Awareness Raising
Training (online – DAART) to all housing staff
Staff trained BDS 2023 Number of staff
trained
Ongoing 182 staff completed
training as of 19
October 2022.
Pathway plan
developed
Review Care Pathways for Care Experienced
Young People and for young people with
complex needs transitioning from care
Pathway reviewed BDS/
H&SC
2024 Review report Partially
complete
Care pathways for CEYP reviewed and revised CEYP
protocol implemented. Further work required on young
people transitioning from care with complex needs.
Page 73 of 221

Page 74

32
Local Housing Strategy Annual Progress Report 2022
Strategic Housing Outcome 5: We will tackle climate change and fuel poverty
Action Baseline 2019/20 Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator 2021/22
KEY ACTION 5.1
We begin a just
transition towards
a Net Zero North
Lanarkshire
Pilots in progress Adopt ‘as standard’ non-gas heating
approaches for new council homes
Adopt new approach NS 2024/25 Approach and
process developed
Ongoing Pilot project of 19 homes in Airdrie under construction. Results of pilot will
inform.
3.8 (tCO2/year) Average CO2
emissions per home
Ongoing Pilot project of 19 homes in Airdrie under construction. Results of pilot will
inform.
Separate
specifications and
processes exist
Integrate approach to procuring and
maintaining renewable energy installations
Adopt joint technical
specifications for use
of Air Source Heat
Pumps
HP/NS 2021/22 Technical
specifications
Ongoing Ongoing
Establish process
for agreeing new
technical solutions
for alternative
heating systems
HP/NS 2021/22 Process for technical
solutions
Ongoing Ongoing
- Develop understanding of whole life costs
and issues associated with the transition to
low and zero carbon heat on the council and
its tenants
Evaluate impact of
Alternative Heating
pilots
HP/NS 2023/24 Evaluation report Ongoing Pilot project of 19 homes in Airdrie under construction. Results of pilot will
inform.
- Investigate opportunities for district heat
zones
Improved
understanding to
inform strategic
approach in LHEES
CE 2022/23 Options report Not yet
started
Discussions ongoing on who is best placed to lead
on LHEES, aligning this requirement with remit and
available resources.
Feasibility Study 
underway
We will work with our GCR partners to carry
out a feasibility study to outline a clear route
map to successfully deliver the large scale
retrofit programme
Route map BDS/
HP
2024 Route map Ongoing Feasibility study complete. Housing Portfolio Group
considering next steps and actions.
- To address skills gaps and meet the demands
of the City Region new homes and green
energy retrofit programmes we will develop
an integrated skills employment programme
for housing build and repair programmes in
the GCR
Skills development 
programme 
developed
BDS/
NS
2024 Integrated skills 
employment 
programme
Ongoing Glasgow City Council commissioned a report from
Grant Thornton in 2021. Following on from the report
GCC have arranged follow up meetings with the GCR
authorities to discuss funding and challenges, the
last meeting focused on skill shortages for energy
efficiency works.
Page 74 of 221

Page 75

33
Local Housing Strategy Annual Progress Report 2022
Strategic Housing Outcome 5: We will tackle climate change and fuel poverty
Action Baseline 2019/20 Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator 2021/22
KEY ACTION 5.2
We improve the
energy performance
of our housing
stock
100% compliance All council new builds meet NLC New Build
Sustainability Standard (which is currently
for Silver Aspects 1&2)
100% compliance with
standards subject to
annual review
NS Annual New build
specifications
On Track 100% 100% of new
builds completed
in 2021/22 meet
standards (137
homes)
- Develop ‘route map’ for EESSH2
compliance
Route map developed HP 2021/22 Route map Ongoing Consultant appointed to support the development of
route map. 
82% of homes in
PRS meet EPC D
(home analytics
data)
Enforce private rented sector energy
efficiency regulations and engage with
private landlords to improve compliance
Local Energy Efficiency
in the PRS Strategy
developed
PSH 2021/22 PRS Strategy Ongoing Works on-going to ensure compliance at application
stage for landlords who renew, and also for new
applications.
Evaluation of new
processes
% of PRS homes
meeting EPC D
On Track Current application process ensures that all new
and renewal applications have a suitable EPC for the
property(s) within the landlord's portfolio.
£14.5 million of
EES:ABS funding
invested in homes
in North Lanarkshire
and 1,000 owners
assisted
Manage Energy Efficient Scotland: Area
Based Scheme (EES:ABS) in
North Lanarkshire
Dependent on annual
allocation of funding -
£2.78m allocated for
2021/22
HP Annual Number of
households assisted
Ongoing Uptake for the scheme has been affected by
changes in legislation and external funding meaning
a percentage contribution from owners is now
required to carry out the improvement works. It
is anticipated that this will affect uptake for the
scheme going forward, unless there is a change in
funding parameters. Measures are being taken to
encourage owners to participate.
Page 75 of 221

Page 76

34
Local Housing Strategy Annual Progress Report 2022
Strategic Housing Outcome 5: We will tackle climate change and fuel poverty
Action Baseline 2019/20 Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator 2021/22
KEY ACTION 5.3
We help households
out of fuel poverty
ASHP installed in
316 existing homes
with further 40 new
builds planned for
ASHP/Solar PV/
Battery Storage
– data monitoring
agreed for future
contracts
Evaluate impact of low-carbon heating on
tenants’ energy use and costs to ensure
‘just transition’
Evaluate Energy Use,
Effectiveness and Tenant
Satisfaction
HP/NS 2024/25 Evaluation report Ongoing Pilot project of 19 homes in Airdrie under
construction.
Results of pilot will
inform.
23% Improve energy efficiency and fuel poverty
advice
Develop strategic
partnership with Home
Energy Scotland
BDS 2021/22 % of households in
fuel poverty
Ongoing Energy advice training being arranged with HES for
all housing staff.
Funding secured to deliver an Energy Advice Service
in North Lanarkshire for implementation in 2023.
20%
9% % of households in
extreme fuel poverty
7%
£620 Median (adjusted) fuel
poverty gap
£520
Limited
understanding
based on national
data sets
Improve understanding of the extent,
nature and location of fuel poverty
to enable better identification of fuel
poor households and target resources
effectively
Develop measures to
better identify fuel poor
households, enabling better
targeting of resources
BDS 2022/23 Fuel poverty
measures
Ongoing Liaising with HES and Fuel Poverty Sub-Group
Page 76 of 221

Page 77

35
Local Housing Strategy Annual Progress Report 2022
Strategic Housing Outcome 6: Our homes will be fit for the future
Action Baseline 2019/20 Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator 2021/22
KEY ACTION 6.1
Ensure social
rented housing
continues to
meet regulatory
standards
- Deliver priority actions set out in Housing
Asset Management Plan
Actions progressed BDS 2025/26
with annual
review
Housing Asset
Management Plan
Annual Review
Ongoing HAMP Annual Review approved in August 2022 and
ongoing monitoring of actions.
- Develop route map to compliance for NLC
housing stock
Route map
developed and
implemented
HP 2021/22 Route Map Complete Consultant report on achieving NET Zero provided
2021. Financial implications for the stock presented
to senior management team. New EESSH report
commissioned.
89% SHQS
compliance
SHQS compliance Ongoing Compliance routes in place. Impact of changes
to SHQS for electrical compliance/smoke alarms
evaluated for 2021/22.
70%
90% EESSH
compliance
EESSH compliance Ongoing see above 99.2%
3.4% EESSH2
compliance
EESSH2 compliance Ongoing see above
KEY ACTION 6.2
Improve stock
condition in mixed
tenure and other
priority blocks and
estates
- Develop new owner engagement strategy for
mixed tenure estates
Strategy developed
and implemented
HP/PSH 2022 Engagement Strategy No longer
applicable
No longer applicable.
Engagement
underway
Complete CPOs at Millcroft and enable
transformation by Sanctuary (subject to
committee approval)
CPOs complete
and demolition
undertaken
NS Ongoing Number of CPOs Ongoing CPO scheduled to be submitted in early 2023.
Development now being delivered by New Supply.
Committee approval in
Nov 2021 for delivery of
new homes by NLC, rather
than Sanctuary.
- Pilot new approach to identifying and
responding to priorities, using landlord
registration powers to improve house
condition
Pilot complete PSH 2021/23 Pilot report Not yet
started
Not yet commenced, further information being
gathered on if a condition survey is feasible within
current resources.
- Explore development of a factoring support
system to assist owner occupiers who fail to
secure a factor
Development of
factoring support
system explored
PSH 2024 Factoring support
system
Not yet
started
Not yet started.
- Develop a new BTS statement BTS statement PSH 2026 BTS Statement Not yet
started
Not yet started.
- Explore the use of ‘missing shares’ powers to
assist owners to participate in works
Missing shares
powers explored
PSH 2024 Missing shares
powers report
Not yet
started
Not yet started.
- Explore the feasibility of carrying out a house
condition survey to gather better data in
relation to scale and extent of disrepair in the
private sector
Feasibility exercise
complete
BDS/
PSH
2026 Feasibility Report Not yet
started
Not yet started.
Page 77 of 221

Page 78

36
Local Housing Strategy Annual Progress Report 2022
Strategic Housing Outcome 6: Our homes will be fit for the future
Action Baseline 2019/20 Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator 2021/22
KEY ACTION 6.3
Ensure owners
are engaged
and informed
about repair and
maintenance issues
New Scheme of
Assistance being
developed
Develop new Scheme of Assistance Scheme of
Assistance adopted
PSH 2022/23 Scheme of Assistance Complete A new Scheme of Assistance was not required.
Following additional funding for mixed tenure grants,
Scheme was reviewed and published.
28% homes in
urgent disrepair
Number of homes in
urgent disrepair
Ongoing 29%
48% homes in
critical disrepair
Number of homes in
critical disrepair
Ongoing 52%
8% of homes in
extensive disrepair
Number of homes in
extensive disrepair
Ongoing 8%
67% of homes in
any disrepair
Number of homes in
any disrepair
Ongoing 72%
Strategic Housing Outcome 7: We improve the quality and accessibility of the private rented sector
Action Baseline 2019/20 Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator 2021/22
KEY ACTION 7.1
Develop and deliver
new PRS access
scheme
- PRS access scheme developed Scheme developed
and approved
BDS 2022 PRS scheme Ongoing Options paper developed which requires further
discussion prior to implementation of pilot.
41 (2020) Scheme implemented and enabling better
access to the PRS
20 new tenancies
each year
BDS Ongoing
from 2022
Number of homeless
(or potentially
homeless) households
rehoused in the
private rented sector
Ongoing As above. 16
KEY ACTION 7.2
Improve private
sector housing
advice
- Develop and deliver e-learning training
module on the PRS and ensure completion by
all housing staff that deliver housing options
advice
Training developed
and staff trained
BDS 2023 Number of staff
trained
Ongoing E-learning module created and in draft form. Testing
planned prior to launch.
- Establish local PRS champions to encourage
wider improved PRS advice amongst locality
housing teams
At least one ‘PRS
champion’ in each
local housing office
BDS 2023 Number of PRS
champions
Not yet
started
To be progressed in 2023 in tandem with the launch
of the new e-learning module.
- Develop improved information for locality
housing teams on the PRS in North
Lanarkshire and at a locality level as part of
the housing options guide
PRS information
developed and
updated regularly
for locality housing
teams
BDS 2023 Localised information
produced and
updated on a regular
basis
Ongoing Locality information provided in the e-learning
module. This will be supplemented by area profile
information in a revised user friendly format in 2023.
Page 78 of 221

Page 79

37
Local Housing Strategy Annual Progress Report 2022
Strategic Housing Outcome 7: We improve the quality and accessibility of the private rented sector
Action Baseline
2019/20
Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator 2021/22
KEY ACTION 7.3
Develop and deliver
new PRS access
scheme
14,832 Improve registration compliance through targeting
unregistered landlords and landlords whose
registration has expired to ensure they register
Improved
registration
compliance
PSH Ongoing Number of private
landlords registered
Complete A full review of the expired processes for NLC has been
completed and new procedures have been implemented.
8,397 registered
landlords.
- Strengthen partnerships with Police Scotland and
Fire and Rescue to identify criminal activity and
to take multi agency action through the locality
community planning structures
Improved processes
for ensuring private
landlords are ‘fit
and proper’
PSH Ongoing Attendance at local
community groups
Complete Review of panel has been completed. Further, longer-
term work is ongoing in this area to strengthen and fully
review fit and proper and audit processes to strengthen
compliance. Full in depth review of current processes
scheduled to commence in early 2023.
- Work in partnership with Landlord Accreditation
Scotland to deliver training for private landlords
and letting agents in North Lanarkshire
Training delivered PSH Ongoing Number trained Ongoing Landlord Accreditation Scotland training is being delivered
and is ongoing.
143 landlords and
agents trained since
publication of LHS.
- Review the current information provision for
private landlords on the council website and
develop enhanced and improved information
which clearly outlines private landlords’
responsibilities and rights
Information
reviewed and
improved
PSH/
BDS
2023 - Ongoing Updates are carried out to existing published information
with further mailshots available via landlord registration
system where required.
- Re-establish the bi-annual private landlord forum Private landlord
forum held
biannually
PSH/
BDS
2022 Number of private
landlord forums and
number of people
attending
Ongoing Private landlord form re-established with first meeting held
in September 2022.
33 people attended
forum.
- Establish a process to regularly communicate with
landlords through the landlord registration team
on legislative or other policy changes of relevance
Process established PSH 2022 Number of
communications
Ongoing Process is in place to communicate with landlords via SMS
and email using the registration service.
- Develop and issue a bi-annual private landlord
e-newsletter
Newsletter issued BDS/
PSH
2023 Number of
newsletters issued
Ongoing First newsletter in development October 2022.
- Strengthen our outreach and engagement with
private landlords using online platforms
Improved outreach
and engagement
PSH Ongoing Number of
social media
and other online
communications
issued
Ongoing Newsletter published on website. 33 landlords attending
forum.
- Carry out regular surveys of private landlords to
understand challenges and potential solutions to
improve management and quality standards in
the PRS
Surveys carried out BDS Ongoing Number of online
surveys and survey
reponses
Ongoing Survey carried out as part of the LHS development process
which sought to understand the challenges and potential
solutions to improve management and quality standards
in the PRS. Further survey planned in partnership with the
Private Sector Housing Team and as part of the agenda for
the Private Landlord Forum.
499 responses to
survey.
Page 79 of 221

Page 80

38
Local Housing Strategy Annual Progress Report 2022
Strategic Housing Outcome 7: We improve the quality and accessibility of the private rented sector
Action Baseline
2019/20
Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator 2021/22
KEY ACTION 7.3
Develop and deliver
new PRS access
scheme
- Improve our understanding and intelligence of
the PRS to identify issues and target resources
effectively e.g. identifying properties most in need
of energy efficiency measures
Improved
intelligence on PRS
BDS Ongoing Improved data on
the PRS
Ongoing Improved data on PRS expected as part of the new
Rented Sector Strategy when published. In the interim
further analysis of Home Analytics Data required, as well
as collaborative efforts with the Private Sector Team to
improve understanding.
- Scope potential gains from ‘direct interventions’
in substandard PRS properties, such as purchase
and improvement in certain circumstances
Scoping exercise
complete
BDS 2023 Scoping report Ongoing Open Market Purchase Scheme recently expanded, which
includes purchase from a private landlord in certain
circumstances. 
- Develop an engagement strategy for improving
energy efficiency regulations in the PRS which
will include a communications and involvement
strategy and enforcement approach
Engagement
strategy developed
BDS/
PSH
2022 Engagement strategy Not yet
started
Not yet started.
KEY ACTION 7.4
Improve access to
the PRS
- Work with private landlords to improve access to
the PRS for people who are homeless and prevent
PRS households from becoming homeless
Improved outcomes
for homeless
households in the
PRS
BDS Ongoing Number of people
homeless from
PRS and number
of homeless people
rehoused in PRS
Ongoing Range of actions progressed via RRTP. 214 homeless
applicants from the
private the rented
sector.
- Establish a private landlord working group to
identify ways in which the PRS could better
contribute to meeting housing needs in North
Lanarkshire
Private landlord
working group
established
BDS/
H&SC
2023 Number of meetings Ongoing Reps invited to join group at Landlord Forum Event.
Minimal response received so will need to be followed up.
- Work with partner RSLs developing Private
Lettings Services in North Lanarkshire to meet
housing need better, exploring opportunities linked
to RRTP
RSL PSL service
linked to RRTP
BDS 2023 Number of homeless
people rehoused in
the private rented
sector
Ongoing Clyde Valley Housing Association have recently established
a private lettings company. Discussions ongoing as the
new private lettings company becomes further established.
16 homeless
applicants have
been rehoused in
the private rented
sector.
- Review the rent deposit guarantee scheme to
increase uptake
Rent deposit
scheme reviewed
BDS 2023 Number of people
accessing the rent
deposit scheme
Ongoing Review of scheme is currently underway
KEY ACTION 7.5
Improve
involvement of
tenants in the PRS
to improve our
understanding of
issues and help
shape policy
- Establish a PRS tenant panel as part of the tenant
participation activities to identify issues, develop
potential solutions and shape policy to improve
the PRS
Panel established BDS 2023 Number of meetings Ongoing Reps invited to join group at Landlord Forum Event.
Minimal response received so will need to be followed up.
Page 80 of 221

Page 81

39
Local Housing Strategy Annual Progress Report 2022
Strategic Housing Outcome 7: We improve the quality and accessibility of the private rented sector
Action Baseline
2019/20
Milestone Target Lead Timescale Indicators Status Progress 2021/22 Indicator 2021/22
KEY ACTION 7.6
Improve advice and
information to PRS
tenants
- Review and improve the information available for
PRS tenants by working with the PRS tenant panel
to identify gaps and scope for improvement
Information
reviewed and
improved
BDS 2024 PRS tenant
information
Ongoing Not yet started.
- Develop a communications strategy which
involves greater use of social media and online
platforms to increase awareness of tenants rights,
responsibilities and housing options
Communications
strategy developed
BDS/
PSH
2024 Communication
strategy
Ongoing Not yet started.
KEY ACTION 7.7
Support Build to
Rent and Mid-
Market Rent to
deliver high-quality
homes in the PRS
- Work with employers to gather information on the
housing needs of key workers
Information
gathered
BDS Ongoing Information on
housing need
Ongoing Research on housing need planned with NHS Lanarkshire
and larger employers within NL to established gaps and
demand for tenures such as MMR, Shared Equity and
LCHO. Research being scoped in partnership with the
Growth Team.
- Engage with the Build to Rent sector Engagement with
the Build to Rent
sector
BDS/
NS
Ongoing Number of Build to
Rent homes delivered
Ongoing Discussions with developers ongoing. -
- Deliver Mid-Market Rent Homes with RSL partners Deliver Mid-Market
Rent homes
BDS/
NS
Ongoing Number of Mid-
Market Rent homes
delivered
Ongoing 25 MMR homes included in 2023/24-2027/28 SHIP. -
KEY ACTION 7.8
Develop a longer-
term strategic
approach to
improving the PRS
- Develop and implement PRS strategy, following
publication of the new national Rented Sector
Strategy, to outline issues and solutions in a more
detailed  longer-term plan for North Lanarkshire
PRS Strategy
developed and
implemented
BDS/
PSH
2024 PRS Strategy Not yet
started
Not yet started - awaiting publication of the final Rented
Sector Strategy.
Page 81 of 221

Page 82

This document can be made available in a range of languages
and formats, including large print, braille, audio, electronic and
accessible formats.
To make a request, please contact Corporate Communications at:
corporatecommunications@northlan.gov.uk
’S urrainn dhuinn an sgrìobhaidh seo a chur ann an diofar chànanan agus chruthan, a’ gabhail
a-steach clò mòr, braille, cruth claisneachd agus cruthan dealanach agus ruigsinneach.
Gus iarrtas a dhèanamh, cuir fios gu Conaltradh Corporra aig: 
corporatecommunications@northlan.gov.uk
Niniejszy dokument można otrzymać w wielu różnych językach i formatach, w tym również
dużym drukiem, alfabetem Braille’a, w wersji dźwiękowej, elektronicznej i w innych
dostępnych formatach.
Prośby należy składać na ręce zespołu ds. komunikacji drogą elektroniczną na adres: 
corporatecommunications@northlan.gov.uk
此文件可以多种不同语言和格式提供,包括大字体、点字、音频、电子和易读格式。
如想提出请求,请联系企业传讯部:corporatecommunications@northlan.gov.uk
۔ ہے سکتا جا ایکیا ہمار
فر
� یمیں ںتورصو ئیسار بل�قا روا فر�ار ٹ یلیکٹرا ،وی�ڈآ ، ی�ربل� ،فوحر ےرٹبل� لبشمو ںتورصو روا ںنوابل�ز مختلف کو رفری�وستاد سا
corporatecommunications@northlan.gov.uk : ی
ئیں
�مار
فر
� بطہار پر سا سے رفر�فر�ش�ی�کی�فر�و یکمیو ٹ ی�رپورکا یلیے کے تستاخورد مکر ہاربل�
CC_2022_00321
Produced by
NORTH LANARKSHIRE COUNCIL
Enterprise and Communities
Housing Strategy Team
Business Development and Support
Civic Centre
Windmillhill Street
Motherwell ML1 1AB
e. localhousingstrategy@northlan.gov.uk
NORTHLANARKSHIRE.GOV.UK
Page 82 of 221

Page 83

North Lanarkshire Council
Report 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  SL/ GW Date 15/02/23 
From Stephen Llewellyn, Chief Officer, Housing
Management 
Email Llewellyns@northlan.gov.uk Telephone 01698 274162 
Executive Summary 
The purpose of this report is to establish a new fund to assist tenants who are falling into
rent arrears due to the impact of the cost-of-living crisis. The purpose of this flexible
funding is to enable the Council to adapt to the emerging needs of council tenants who
are experiencing financial hardship. 
Recommendations
It is recommended that the Housing Committee: 
(1) Approve the establishment of a Rent Assistance Fund to enable council tenants
on low incomes and those on Universal credit and to help sustain tenancies
(2) Approve the Universal Credit Assistance Fund (UCAF) to be included under this
new fund and the Rent Relief Fund (RRF) to be re-assigned 
The Plan for North Lanarkshire
Priority Improve economic opportunities and outcomes
Ambition statement (11) Increase economic opportunities for adults by understanding,
identifying, and addressing the causes of poverty and deprivation and
barriers to financial inclusion 
1. Background 
1.1 As a result of the impact of Welfare Reform, the Communities and Housing Committee
on 20 November 2019 approved the establishment of a £1million Universal Credit
Assistance Fund (UCAF), which was funded through unallocated HRA reserves. 
1.2 In June 2020, the Council announced the intention to expand the fund to include tenants
who had fallen into arrears because their income had been affected by the Covid 19
global pandemic and they were suffering financial hardship. From this, £300,000 (of the
£1million) was set aside for the Rent Relief Fund (RRF) to help tenants who had been
made redundant, been furloughed, had hours reduced or were self-employed. 
Housing Committee
Rent Assistance Fund
AGENDA ITEM 5
Page 83 of 221

Page 84

1.3 In 2021 and 2022 direct funding was provided by Scottish Government to assist tenants
with the impact of the cost-of-living crisis and impact of Covid.  This funding was
administered by officers in Housing Solutions. To date, the following financial assistance
has been awarded to council tenants over the past 2 years: 
• £3,088,579 UCAF awarded to 7944 tenants 
• £787,727 RRF awarded to 1970 tenants 
• £405,495 funding from Scottish Government as part of the Tenant Hardship Fund was
awarded to 335 tenants
• £363,000 LACER funding from Scottish Government awarded to 384 tenants 
1.4 As Committee will be aware, we are now experiencing a severe cost of living crisis. The
impact of the Covid 19 pandemic, the war in the Ukraine and the disruptions to the global
supply chains have all contributed to a rising rate of inflation which means day to day
costs have escalated. According to the ONS (Office of National Statistics) the most
recent rate of inflation was recorded in September 2022 at 10.1% meaning that the cost
of everyday essentials is around 10.1% higher than in September 2021. The increasing
day to day living costs, particularly around the cost of fuel, mean more tenants are now
facing financial poverty for the first time and the hardship for those already in poverty is
being exacerbated. A recent Committee report about tackling financial insecurity
recognised that: Households worried about the adequacy of their budget may cut back
or go without   fuel, food or other essentials which can contribute to and exacerbate poor
physical and mental health. 
2 Report 
2.1 While administering the above funds mentioned at 1.3, the Council as a housing
landlord, recognised that there are tenants who do not qualify for any other financial
assistance available from either the UK or Scottish Government other than the £400
energy bill discount.  These tenants are on a low income but are over the threshold to
be eligible for any other cost of living financial assistance and are experiencing financial
hardship for the first time.  They are struggling to meet the cost-of-living increases as
well as maintaining rent payments.   
2.2 Latest performance figures show that 10,116 tenants are currently experiencing rent
arrears and just over 70% (7135) are in receipt of Universal Credit. The impact of
Universal Credit on mainstream tenancies has resulted in an increase in rent arrears
overall for tenants in receipt of Universal Credit.  The average rent arrears for a tenant
on Universal Credit (UC) has risen from £499 in 2014/15 to £544 for 2022/23, with this
year’s figure continuing to follow the same trend. 
2.3 The UCAF will remain in its current form however will be part of the overall new Rent
Assistance Fund to be created.  The criteria for this will not change and this fund will
continue to be administered in the same way. 
2.4 However, to assist tenants with no benefit entitlement and who are experiencing rent
arrears and financial hardship it is proposed that a new Fund is established within the
Rent Assistance Fund.  This initiative will seek to ensure tenancies are not put at any
more risk due to the cost-of-living crisis and tenancy sustainment levels continue to
improve or at the very least, are maintained. 
Page 84 of 221

Page 85

The criteria for this fund will be:
• Open to North Lanarkshire Council tenants only
• On a low income but ineligible for any other cost of living awards provided by
Scottish or UK Government such as Tenant Grant Fund or LACER Funding 
This approach will address the impact faced by low income families as wage growth in
the last year has not been sufficient to keep pace with inflation meaning incomes are
reducing in real terms. 
2.5 Of the original £1million awarded to the UCAF and RRF, significant funding remains
available. There are two main reasons for this.  Firstly, there is a requirement for these
funds to be repaid, and although no formal action regarding repayment has been carried
out, some tenants are repaying or when the tenancy ends, the money is removed and
repaid into the fund.  Secondly, the demand for the RRF has reduced significantly since
the end of the pandemic. There is £852,000 available between these funds and it is
proposed that this money is moved into the new Rent Assistance Fund. 
2.6 All payments of the fund will be authorised by a Housing Service Manager to ensure
financial transparency and consistency and the Housing Solutions Manager will have
overall responsibility for the administration of the fund. 
3 Measure of Success 
3.1  Success will be measured by a reduction of rent arrears experienced by tenants who are
claiming Universal Credit as well as those with no benefit entitlement and will seek to
sustain tenancies during this cost-of-living crisis. 
4  Supporting documents 
4.1 No appendices 
Stephen Llewellyn
Chief Officer, Housing Management 
Page 85 of 221

Page 86

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The cost of establishing this fund will be met from the existing UCAF and RR
funds. The service will introduce measures to monitor utilisation of the resource
within funding available which will be incorporated into future budget monitoring
reports. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk  Page 86 of 221

Page 87

Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The impact of rent arrears due to either Universal Credit or the cost of living crisis
has been assessed as a key risk at corporate and service level. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 87 of 221

Page 88

Page 88 of 221

Page 89

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref  PH/FD Date 15/02/23 
Update on Open Market Purchase Scheme 
Programme of Work P013(2) 
From  Pamela Humphries, Chief Officer of Place  
E-mail dicksonf@northlan.gov.uk Telephone
Fiona Dickson, Project
Development Officer      
07581 034 779 
1. Background 
1.1 The purpose of this report is to provide an update on the progress of the Open Market
Purchase Scheme which is an extension of the Empty Homes Purchase Scheme. The
Open Market Purchase Scheme is helping to increase the supply of housing to meet
housing need as part of the Council’s new supply programme. 
1.2 In 2013 the Council established a scheme to purchase empty homes which was
particularly targeted at long term empty properties, particularly those that were falling
into disrepair or blighting the local communities. Since inception, the Empty Homes
Purchase Scheme has brought 317 empty properties back into use at an average
cost of £70,938.
Executive Summary 
The purpose of this report is to provide an update on the progress of the Open Market
Purchase Scheme (OMPS). The OMPS enables acquisition of private sector properties
that are for sale, and predominately are former public sector stock. 
Recommendations 
It is recommended that the Committee:
1) Note the contents of the report and the continued success of the Open Market
Purchase Scheme in helping increase housing supply and improve stock condition.
2) Note that a further update will be provided to committee in 6 months  
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth
AGENDA ITEM 6
Page 89 of 221

Page 90

1.3 In addition to the Empty Homes Purchase Scheme the Enterprise and Housing
Committee approved the development and implementation of an Open Market
Purchase Scheme on 15th February 2018 and set a target of acquiring 100 properties
per annum.  In 2018/19 this target was exceeded, and 130 homes were purchased in
total. In 2019/20 this number was also exceeded, and 143 properties were purchased
in total, and in 2020/21 106 properties were purchased, despite the challenges posed
by the Covid pandemic. An ambitious target of 130 properties was set for 2021/22
however due to the competitive market the final figure purchased for 2021/22 was 75
properties. This was mainly due to the buoyancy of the current housing market where
homeowners in this sector were able to sell their homes quickly and were being offered
more than the value of the Home Report. 
1.4 In November 2021, the Housing & Regeneration Committee approved the expansion
of the OMPS which now allows us to acquire homes that would enable common
works to progress in priority blocks and allow the only remaining owner occupier to
remain in their properties as a social tenant. 
1.5 In August 2022, the Housing & Regeneration Committee approved the expansion of
the OMPS to now consider buying homes from private landlords and allowing the
tenant to remain in the home as a council tenant to help prevent homelessness and
increase the council’s housing stock. 
2. Report 
2.1 The Open Market Purchase Scheme has proved to be very popular with over 2545
enquiries/applications.  In addition to enquiries/applications, staff proactively engage
with sellers and Estate Agents within all areas of North Lanarkshire.  This allows
targeted identification of potential properties to acquire where identified demand
exists or to support and enable progression of common works in mixed tenure blocks.
In 2022/23, 44 properties have been purchased as at 6th  January 2023, with a further
31 at conveyancing stage. The locations of the properties purchased are outlined
below: 
2021/22   2022/23 
Area Number of
Properties 
Area Number of
Properties 
Airdrie 25  Airdrie 12
Bellshill 2  Bellshill 1
Coatbridge 9  Coatbridge 7
Cumbernauld 6  Cumbernauld 2
Kilsyth 3  Kilsyth 2
Moodiesburn 1  Moodiesburn 2
Motherwell 16  Motherwell 9
Shotts 3  Shotts 1
Viewpark 4  Viewpark 0
Wishaw 6  Wishaw 8
Total 75  Total 44 
Page 90 of 221

Page 91

2.2 Apartment size by areas - 
2 Apartment
- 1 bedroom
3 Apartment
- 2 bedroom
4 Apartment
- 3 bedroom
5 Apartment
- 4 bedroom
Airdrie
2021/22 2 14 8 1
2022/23 2 8 2 0
Bellshill
2021/22 0 0 2 0
2022/23 0 1 0 0
Coatbridge
2021/22 1 6 2 0
2022/23 2 4 1 0
Cumbernauld
2021/22 0 2 3 1
2022/23 2 0 0 0
Kilsyth
2021/22 0 0 1 2
2022/23 0 1 1 0
Moodiesburn
2021/22 0 1 0 0
2022/23 0 2 0 0
Motherwell
2021/22 4 7 5 0
2022/23 0 6 3 0
Shotts
2021/22 0 0 0 0
2022/23 0 1 0 0
Viewpark
2021/22 1 1 2 0
2022/23 0 0 0 0
Wishaw
2021/22 0 4 2 0
2022/23 1 6 0 0 
2.3 Of the properties purchased in 2022/23, 32 are categorised as having been long term
empty properties, and 12 were purchased through the Open Market Purchase Scheme,
although in effect the two schemes have now been merged into one. All the properties
purchased are former council or Development Corporation properties. 
2.4  The number of applicants for the programme have been lower so far this year
compared to other years and more in line with 2021/22.   At the end of Quarter 3, 43
properties have been purchased, which compares to 52 homes purchased at the end
of Quarter 3 in 2021/22.  Extrapolating the figure to the end of the year it would seem
Page 91 of 221

Page 92

likely that this year approximately 60 homes will be purchased.  This is directly linked
to the heated housing market at present where homeowners in this sector of the
market are able to sell their homes quickly in the open market at the moment.
2.5 Recent extensions to the Open Market Purchase Scheme have increased the
opportunities for acquiring properties within different sections of the market. As such,
promotional activities have been carried out throughout Q2 and Q3 of 2022/23 to
increase awareness and appropriately advertise to owners and Landlords. These
activities have included but are not limited to, an ongoing social media campaign; 1,043
letters being sent to all the sole private owners in blocks of flats, where all other flats
are owned by the council and 1000 leaflets printed for drop off in public areas. A total
of 91 applications have been received via these extended routes, with 62 applications
at initial approval stages and 2 applications having progressed to the Legal stage. 
2.6 There were six owners within the first phase of the re-provisioning programme who
required to be bought out, and engagement with these owners has been progressing. 
Five owners have now sold their properties to the council, and a compulsory purchase
order is now being progressed to purchase the home of the remaining owner.  In
addition, there are five owners in the remaining multi storey flats, all in Motherwell.  The
Committee previously agreed that the council should seek to purchase these flats and
allow owner occupiers to remain as council tenants, should they wish.  To date three
flats have been purchased and discussions are progressing with the other owners
regarding the potential for the council to buy back their flats as soon as possible. 
3. Measures of success 
3.1  The acquisition of these properties helps the Council meet its Local Housing Strategy
objectives to increase housing supply to meet identified need; help bring empty
properties back into use, and help improve housing conditions, including energy
efficiency.   
4. Supporting documentation 
No appendices 
Pamela Humphries
Chief Officer of Place 
Page 92 of 221

Page 93

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
A budget of £10.55m has been allocated in 2022/23 to fund the purchase and
repair of properties through the Empty Homes Purchase Scheme and the Open
Market Purchase Scheme which includes an estimated contribution of £1.5m from
the Scottish Government. 
As at 6th January 2023, £3,850,816 has been spent on acquisition and repair, and
£3,289,324 has been committed.  The average purchase price of the properties
acquired in 2022/23 is £79,130 and average repairs cost is £11,621. 
Agreement has been reached with the Scottish Government to apply a sliding scale
for buy back funding, based on property value as follows: 
• £35k grant per unit, for homes up to an £80k purchase price
• £40k grant per unit, for homes with an £80-£90k purchase price
• £45k grant per unit, for homes with a £90-£100k purchase price
• £50k grant per unit, for homes with a purchase price above £100k 
Previously, any buy back purchases were eligible for a maximum grant contribution
of £30k per unit. The new scale is applicable to any buy back grant claimed from 6
December 2022.
Funding to acquire properties from owners in the towers/ Phase 1 re-provisioning
will be contained within the overall OMPS budget. 
Funding for the proposed extension of the Open Market Purchase Scheme will be
met from the HRA as part of the budget provision for the New Supply Programme. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
Page 93 of 221

Page 94

5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The properties purchased will be brought up to the Scottish Housing Quality
Standard, which may improve their thermal efficiency and help reduce carbon
emissions. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Page 94 of 221

Page 95

The expansion of the OMPS to enable certain tenants of private landlords to
become  North Lanarkshire Council tenants following the purchase of their may
result in increased demand from other landlords who want to be provided with this
option.  There will therefore be clear criteria set out regarding the eligibility criteria.   
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 95 of 221

Page 96

Page 96 of 221

Page 97

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  PH/TM Date 15/02/23 
New Housing Supply Programme – Procurement Report 
From  Pamela Humphries, Chief Officer of Place  
E-mail mallaghant@northlan.gov.uk Telephone
Tony Mallaghan, Housing
Development Manager,
07970 016251 
Executive Summary 
The purpose of this report is to update the Committee on current procurement activity
relating to the new build housing programme and seek approval to progress procurement
arrangements as outlined in the report. 
Recommendations
It is recommended that the Committee: 
1) Note the award of a call off contract in line with the Scotland Excel New Build
Residential Framework for the construction of new build housing to CCG
(Scotland) Limited at Brandon Street, Motherwell up to the revised value of
£11.527M, including contingency allowance. 
2) Approve the change to the procurement route to mini competition via the Scottish 
Procurement Alliance (SPA) H2 Framework for the projects at King Street,
Wishaw, Graham Street, Wishaw and Laburnum Road, Viewpark, if best value
cannot be achieved through the current direct award procurement process. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth
AGENDA ITEM 7
Page 97 of 221

Page 98

1. Background 
1.1 The Council has an approved programme to deliver 5,000 new homes by 2035. The
delivery of such a large scale programme presents a number of challenges, not least
of which is the procurement of contractors to build the houses to the required standard,
within the timescale required and at a competitive cost. In order to increase the pace
of delivery, secure best value and minimise risk to the Council, a range of procurement
options have been utilised. 
1.2 The Council has also participated in the establishment of a new build framework
agreement through Scotland Excel, which has been available for use from August
2019. This framework agreement is for the delivery of new build housing projects for
Scottish local authorities, housing associations and other public bodies and includes a
number of lots covering different geographical areas and different sized developments. 
1.3 The Housing and Regeneration Committee on the 25 November 2020 approved the
procurement route for the next phase of the new build programme to commence
procurement activity with the Scottish Procurement Alliance (SPA) and Scotland Excel
New Build Residential framework to deliver the next phase of new build sites approved
by the Committee. As reported at the Housing and Regeneration Committee on the 8
September 2021, due to the current capacity issues in the market we intend to utilise
the ability in the SPA and Scotland Excel Frameworks to direct award to available
contractors, including to contractors who are not highest ranking. Justification for the
identification of a contractor can be made by complying with the direct award criteria
listed in the respective frameworks, with a contract award being subject to value for
money assessment against the framework rates. A benchmarking appraisal was
carried out for each project and is identified in each project’s Sourcing Methodology. 
2. Report 
2.1  The Housing and Regeneration Committee in November 2021 approved the
procurement of a call off contract in line with the Scotland Excel New Build Residential
Framework for the construction of new build housing by CCG (Scotland) Ltd at Brandon
Street, Motherwell (48 units), up to the value of £9.67M, including contingency
allowance. CCG (Scotland) Ltd submitted a revised cost of £11.527M, including
contingency allowance.  The tender cost obtained is considered to represent best value
and the rates have been benchmarked against the appropriate framework rates with
an allowance for current market conditions, to allow the contract award to be made. 
The award of a call off contract has been approved under General Contract Standing
orders (section 21.3.2). 
2.2 Approval has been obtained from previous Committees for a direct award approach for
projects at King Street, Wishaw; Graham Street, Wishaw and Laburnum Road,
Viewpark. The feasibility costs obtained are not considered to represent best value and
a value engineering exercise is currently underway.  However, if it is not possible to
agree a final tender price to allow the contract awards to proceed, it is proposed to
change the procurement to a mini competition via the Scotland Procurement Alliance
(SPA) H2 Framework. 
Next Steps 
2.3 The next batch of sites will be reviewed, and a suitable procurement route will be
identified to progress these projects to deliver new build housing to align with the Plan
for North Lanarkshire.
Page 98 of 221

Page 99

Price Savings / Increases 
2.4 There are no cashable savings attributed to the contracts outlined within this report. 
Price Stability 
2.5 The pricing mechanism is a Priced Contract with Activity Schedule offering a good level
of cost certainty. 
Community Benefits 
2.6 The Council is committed to maximising the delivery of community benefits. The
procurement included a community benefit requirement, this approach is designed to
deliver local community benefits where possible.  The successful tenderer for contracts
recommended for award within this report have committed to delivering a range of
community benefits and these are detailed in the table below: 
Brandon Street, Motherwell
OUTCOME  No of Mandatory
Outcomes
New Job for an Apprentice from a
Priority group
1
New Job for an Individual from a
priority group
2
Work Experience Placement (16+
Years of Age)
5
Educational Visits 4
Financial Support for a Community
Project
3
Non Financial Support for a
Community Project
3
TOTAL 18 
Fair Work Practices 
2.7 All contractors appointed to the SPA and Scotland Excel frameworks have evidenced
Fair Work Practices within their organisations as part of the procurement procedures
to be appointed to the respective frameworks and have further demonstrated how they
will promote them in the delivery of Council call-off contracts. 
Contract Strategy 
2.8 Officers from New Supply will be responsible for managing contracts which will be
undertaken in accordance with the council’s agreed approach to contract and supplier
management. 
Page 99 of 221

Page 100

3. Measures of success 
3.1  The proposed contract awards detailed within this report will deliver the following
outcomes: 
a) The appointment of Contractors who have the experience and capability to deliver new
build social housing;   
b) The procurement procedure is compliant with the procurement legislation and internal
procedures; 
c) That best value is both demonstrable and achieved; 
d) That the Contract secures a range of community benefits; 
e) That the Contract supports payment of the real Living Wage to staff employed in the
delivery of the Contract; 
f) That the Contract performance is proactively managed against a number of Key
Performance Indicators.   
4. Supporting documentation 
Appendix 1 Summary of Procurement Procedures
Appendix 2 SME Status of all Tenderers 
Pamela Humphries
Chief Officer of Place 
Page 100 of 221

Page 101

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Council’s new build programme helps reduce inequalities through a number of
design specifications including: 
• Housing for Varying Needs;
• Secure by Design;
• Achieving the Scottish Government requirements for “Greener Homes”
to reduce the incidence of fuel Poverty; and
• The inclusion of design standards relating to access to internet
capabilities including ‘fibre to the property’. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The funding for all of the projects referred to in this report can be met from the
Council’s Housing Revenue Account budget for the New Supply Programme. Grant
support is also provided by the Scottish Government. The costs associated with
contract delivery will be contained within the New Supply budget.   
A funding application has been submitted to the Scottish Government Scottish
Heat Network Fund to assist with the costs of the Ground Source Heat Pump
system at Motherwell YMCA and 303 Brandon Street. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Page 101 of 221

Page 102

5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The proposed award of contracts detailed within this report will ensure that the impact
on the Council’s carbon footprint is mitigated. The specifications incorporated within
the contract documentation will: deliver reduced energy need; encourage
sustainable construction; promote health and wellbeing; reduce waste and resources
through effective storage, collection and composting of waste and recyclable
materials and; include measures which will reduce CO2 emissions. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The implementation and delivery of the New Supply programme will be promoted
through the New Supply PR plan and via communications with elected members and
local stakeholders 
Page 102 of 221

Page 103

5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Risk associated with the New Supply Programme is managed within the New Supply
Risk Register process. The risk register has been updated to reflect the impact of
the current national issues affecting the costs and availability of materials and labour
along with general high inflation on programme timescales and costs as well as how
the risk to the council will be mitigated as far as possible. The tender cost increases
over the past 12 months are on average 16% to 20% and this trend of tender price
increases will extend into 2023 excluding the additional changes to legislation and
meeting Scottish Government energy targets. Comparing similar sized projects the
tender costs over past 18 months are on average 25% higher. 
The council will also undertake detailed ground investigation and other relevant site
assessments prior to proceeding with the development of any particular site to help
mitigate the risk of unforeseen costs relating to ground conditions, although this risk
cannot be eliminated entirely. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 103 of 221

Page 104

Appendix 1 Summary of Procurement Procedures 
Construction of New Build Social Housing at Brandon Street, Motherwell 
Procurement Title Contractor Design and Construction of New Build
Social Housing at Brandon Street, Motherwell
Estimated contract start date February 2023 – June 2024
Initial Contract Period  15 months
Contract Defects Period  12 months
Estimated Total Contract value £11,527,045 (£11,027,045 + £500,000)
Contract Reference Number NLC- SLP-22-067
Contract Notice Reference Not Applicable
Date Contract Notice Published  Not Applicable
Governing UK Regulation Public Procurement Regulations (Scotland) 2015
Procurement Procedure  Direct Award from a 3rd Party Framework
Evaluation approach adopted N/A
Interest List – number of
Contractors that downloaded
the procurement documents
from the procurement portal
N/A
Number of selection stage
documents received N/A
Number of Contractors invited
to tender 1
Number of tenders received  1
Number of non-compliant
tenders 0
Number of compliant tenders 1
Number of recommended
contractors 1
Basis of contract award Quality 40% Price 60%
Evaluation team names and job
titles of Evaluators and their
role in evaluation
New Supply 
Page 104 of 221

Page 105

Appendix 2 SME Status of all Tenderers 
Project Tenderers Name
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local
Authority /
Council
Area)
Brandon Street, Motherwell CCG (Scotland) Ltd Large South
Lanarkshire 
Page 105 of 221

Page 106

Page 106 of 221

Page 107

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  TM/KD Date 15/02/23 
Future New Build Sites 
From  Pamela Humphries, Chief Officer of Place  
E-mail divink@northlan.gov.uk Telephone
Kevin Divin, Project
Development Co-ordinator  
07583 089 510 
Executive Summary 
The council has an approved target to deliver 5,000 new affordable rented homes by 2035.
To date 970 new build houses have been completed with a further 421 homes under
construction. To ensure an adequate supply of sites for the new build programme, potential
council owned sites continue to be evaluated for their suitability for inclusion within the
programme. The sites outlined within this report have been assessed and are
recommended for inclusion within the new-build programme subject to the conclusion of
detailed ground investigations, full title checks and appropriate statutory consents. 
Recommendations 
It is recommended that the Committee:
1) Approves the inclusion of the proposed sites, as outlined in section 2.1 and
Appendix 2 of this report, within the new-build programme.
2) Approves the potential off the shelf purchase of completed homes at Prospecthill
Road, Ravenscraig; Torrance Park, Newarthill and Springhill Road, Shotts as
outlined in section 2.3  
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth
AGENDA ITEM 8
Page 107 of 221

Page 108

1. Background 
1.1 The council has an approved target to deliver 5,000 new homes by 2035, which
although predominantly new build homes also includes properties purchased through
the council’s Buy Back Schemes. To date, 970 new build homes have been completed,
with a further 421 homes under construction. In addition, 606 homes have been
purchased through the Buy Back schemes as at 9th January 2023.  A summary of
progress with the new build programme is attached at Appendix 1 .
2. Report 
2.1 To ensure an adequate supply of sites for the new build programme, potential sites
continue to be evaluated for their suitability for inclusion within the programme. The
sites outlined below have been identified and are recommended for inclusion within the
new-build programme subject to the conclusion of detailed ground investigations, full
title checks and relevant statutory consents. It is proposed that development be
considered at the following sites: 
• Dalzell Drive, Motherwell (former Taggarts Car Sales, Windmillhill Street) –
approximately 24 units (subject to the council concluding purchase of site)
• Former Thornlie Church Hall Site, Caledonian Road, Wishaw – approximately 6
units 
2.2 The proposed project at the former Thornlie Church Hall Site, Caledonian Road,
Wishaw is a priority town centre sites which support delivery of the Town Visions as
part of the council’s commitment to town centre regeneration. This project is at an early
stage of design development / feasibility. 
2.3 It is also proposed to progress the potential ‘off the shelf’ purchase at the following
locations: 
• 23 new homes (4 x 2apt/2p Cottage Flat, 4 x 3apt/4p Cottage Flat, 10 x 3apt/4p
Terraced House, 5 x 4apt/6p Terraced House) at Prospecthill Road, Ravenscraig
from O’Brien Properties Limited
• 6 new homes (6 x 3 bed 5p terraced houses to be purchased as agreed at Finance
and Resources Committee on 30 November 2022) – plus potential purchase of up
to 8 more homes at Torrance Park, Newarthill from Barratt Homes 
• Approximately 22 new homes (houses) over several phases at Springhill Road,
Shotts from Keepmoat 
The acquisition price will be subject to future reports to Finance and Resources
Committee. 
2.4 Site location plans are included for each of these sites within Appendix 2 to this report. 
2.5 Consultation with local elected members and North Lanarkshire Federation of
Tenants and Residents Associations has been undertaken for both the new build and
proposed off the shelf acquisitions and no objections to these sites have been
received. 
Page 108 of 221

Page 109

3. Measures of success 
3.1  The success of the council’s new supply programme is measured in terms of: 
• Achievement of target completions of 5,000 completions by 2035.
• Delivery of projects within budget.
• Quality of housing delivered.   
4. Supporting documentation  
Appendix 1  Summary of New Build programme
Appendix 2 Site Locations 
Pamela Humphries
Chief Officer of Place 
Page 109 of 221

Page 110

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?  
The new build programme includes measures that will help reduce inequalities of
outcome through certain design features including: 
• Housing for Varying Needs to make homes as accessible as possible;
• Secure by Design to make homes and the surrounding environment as safe
and secure as possible.
• Achieving the Scottish Government requirements for Greener Homes to
• reduce the incidence of fuel Poverty.
• Facilitating improved access to high speed internet capabilities including
installation of ‘fibre to the property’.  
The above features are also part of the specification requirement for off the shelf
properties. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The cost of constructing or purchasing these homes will be contained within the
overall budget for the new build programme within the Housing Revenue Account. 
There is a grant from the Scottish Government towards the cost of the new homes
which is from a minimum of £71,500 per unit 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic?
Page 110 of 221

Page 111

Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☒ 
If Yes, please provide a brief summary of the impact? 
There are no direct Technology/Digital impacts directly arising from this report. The
scope of the new homes includes Cat5e cabling to support home networking and
Fibre to the Premises (FTTP) for digital connectivity as part of the ‘future-proofing’ of
North Lanarkshire Council’s new housing stock.  This is also part of the specification
requirement for off the shelf properties. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Intrusive ground investigations will be undertaken as part of the due diligence
associated with determining the suitability of sites for development. This is
undertaken in liaison with North Lanarkshire Council’s Environmental Health
(Pollution Control) to ensure that appropriate investigations are undertaken. 
The new homes are built to higher energy efficiency and sustainability standards,
which helps to reduce future carbon emissions from the properties. This is done via
a fabric first approach to development, while incorporating renewable technologies
where appropriate. 
The Council’s New Supply Programme will ensure that the impact on the Council’s
carbon footprint is mitigated. The specifications incorporated within the contract
documentation will: deliver reduced energy need; encourage sustainable
construction; promote health and wellbeing; reduce waste and resources through
effective storage, collection and composting of waste and recyclable materials and;
include measures which will reduce CO2 emissions). For off the shelf purchases all
such statutory consents would apply and other considerations are included in the
Page 111 of 221

Page 112

negotiations including specification agreement between the Council and Developers
prior to acquisition. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Risk associated with the New Supply Programme is managed within the Enterprise
& Communities Resources Risk Register process. By undertaking detailed Ground
Investigation and other relevant site assessments, prior to proceeding with the
development of any particular site, the council is mitigating the risk of unforeseen
costs relating to ground conditions, although this risk cannot be eliminated entirely. 
In the case of off the shelf purchases these risks are borne by the developer.
.  
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 112 of 221

Page 113

Appendix 1 - New Build Sites Summary (as at 9th December 2022)
Area Location Units Comments
Completion
Year
Holytown Main St 10 Completed (Amenity) 2010/11
Holytown Spruce Way 10 Completed 2010/11
Motherwell
Ravenscraig (David Wilson
Homes) 18
Completed (off the
shelf) 2010/11
Airdrie Clarkston PS 19 Completed 2011/12
Millerston Coshneuk Rd 11 Completed (Amenity) 2011/12
Cumbernauld North Rd 29 Completed 2011/12
Wishaw Cambusnethan PS 20 Completed (Amenity) 2011/12
Viewpark Laburnum Rd (Phase 1) 12 Completed 2012/13
Viewpark Laburnum Rd (Phase 2) 28 Completed 2013/14
Moodiesburn Gartferry Road 50 Completed 2013/14
Cumbernauld Westfield Drive 30 Completed  2013/14
Airdrie Former Albert PS 14 Completed 2014/15
Chryston Lanrig Rd 27 Completed (Amenity) 2014/15
Coatbridge Corsewall St 14 Completed 2014/15
Bellshill Former Belvidere PS 20 Completed 2015/16
Kilsyth Fisher Ave 30 Completed 2015/16
Chryston
Old Lindsaybeg Rd
(Persimmon) 14
Completed (off the
shelf) 2015/16
Motherwell Glencairn Tower site 25 Completed 2016/17
Viewpark Former Tannochside PS 16 Completed 2017/18
Wishaw Walkerburn Dr, Coltness 20 Completed 2017/18
Cumbernauld Cardowan Drive 30 Completed 2017/18
Cumbernauld Kildrum Nursery 16 Completed 2017/18
Chryston Station Rd (Persimmon) 30
Completed (off the
shelf) 2017/18
Chapelhall
Former St Aloysius PS
(Phase 1) 24 Completed 2017/18
Chapelhall
Former St Aloysius PS
(Phase 2) 6 Completed 2018/19
Cumbernauld Brown Road 20 Completed 2018/19
New
Stevenston Former New Stevenston PS 15 Completed 2018/19
Chryston Greenlea Road 21 Completed 2018/19
Coatbridge Old School Court 20 Completed 2018/19
Airdrie Former Alexandra PS 14 Completed 2018/19
Harthill Former Harthill PS 20 Completed 2018/19
Motherwell
Cleekhimmin, Ravenscraig
(Barratt) 10
Completed (off the
shelf) 2019/20
Coatbridge Blair Road 40 Completed 2019/20
Motherwell Calder PS 30 Completed 2019/20
Gartcosh
Johnston Rd / Inchnock Ave
(Bellway) 16
Completed (off the
shelf) 2019/20
Page 113 of 221

Page 114

Cumbernauld Cedar Road Nursery 14 Completed 2019/20
Chryston Main Street (Bellway) 18
Completed (off the
shelf) 2019/20
Wishaw
Meadowhead Rd,
Ravenscraig (Keepmoat) 11
Completed (off the
shelf) 2019/20
Bellshill
Caledonian Avenue (Phase
1 ) 19 Completed 2020/21
Wishaw Dimsdale Road (Phase 1) 6 Completed 2020/21
Bellshill 
Caledonian Avenue (Phase
2)  8 Completed 2021/22
Wishaw 
Dimsdale Road  (Further
Phases) 55 Completed 2021/22
Coatbridge 
St James PS / Lismore
Drive 58 Completed 2021/22
Wishaw
Roberts Street (Belhaven
House) 16 Completed 2021/22
Wishaw Mossburn St, Waterloo 20 Completed 2022/23
Plains Plains PS 16 Completed 2022/23
Sub total   970 Completed  
Chryston 
Former Chilterns Care
Home 21 On Site   
Airdrie Dykehead Road (Holehills) 150 On Site  
Airdrie Northburn Place 31 On Site  
Bellshill Community Road 29 On Site  
Airdrie 
Former Orrs Building
(Wilson) 20 On Site  
Wishaw
Castlehill Road,
Gowkthrapple (Phase 1)  97 On Site  
Coatbridge Berwick St 19 On Site  
Stepps Gateside Farm (Barratt) 30 On Site  
Motherwell
Former BRE, Ravenscliff
Rd, Ravenscraig 24 On site  
Sub total   421 On site  
Coatbridge Columba High School 130
Design development
underway  
Motherwell Mabel Street 20
Planning app
approved   
Glenmavis McArthur Ave 21
Planning app
approved  
Viewpark Laburnum Rd 26
Planning app
approved  
Coatbridge Bank Street 9
Planning app
approved  
Airdrie Glenacre Drive 16
Planning app
approved  
Chapelhall Gibb Street 25
Planning app
approved  
Wishaw Graham Street 13
Planning app
submitted  
Page 114 of 221

Page 115

Coatbridge Kildonan Street 49
Design development
underway  
Cumbernauld
Former Cumbernauld
Village PS 8
Planning app
approved  
Glenboig
Former Police Station, Main
Street 7
Planning app
approved  
Motherwell Brandon Street 48
Planning app
approved  
Wishaw King Street 5
Planning app
approved  
Wishaw
Stewarton Street & Kings
House 17
Design development
underway  
Motherwell
Former Motherwell Town
Hall 20
Planning app
approved  
Airdrie Calderigg Place  42
Design development
underway  
Airdrie  Former Petersburn PS  40
Planning app
approved  
Millerston Coshneuk Road 16
Design development
underway  
Wishaw  Caledonian Road  9
Planning app
submitted   
Coatbridge  Mitchell Street 100
Approved at
Committee - Aug
2022  
Caldercruix  Former St Mary's PS  25
Approved at
Committee - Aug
2022  
Bellshill Thorn Road  26
Approved at
Committee - Aug
2022  
Airdrie  Airdriehill Road  75
Approved at
Committee - Aug
2022  
Motherwell  Hope Street (Masonic Hall) 10
Approved at
Committee - Aug
2022  
Coatbridge  Main Street  40
Approved at
Committee - Aug
2022  
Sub total   797
Design
development
underway  
Coatbridge Shawhead 111 Re-provisioning site  
Coatbridge Dunbeth  170 Re-provisioning site  
Motherwell Coursington 60 Re-provisioning site  
Sub total   341
Re-provisioning
sites  
Page 115 of 221

Page 116

Cumbernauld
Community Growth Area -
Phases 1-3 (Bellway) 75
Off the shelf
Planning app
submitted  
Chryston Gartferry Road (Allanwater) 22
Off the shelf                
Purchase approved
at Committee  
Coatbridge  Lorne Place (Allanwater)  24
Off the shelf 
Purchase approved
at Committee  
Moodiesburn
Auchengeich, Gartferry
Road (Bellway) 12
Off the shelf 
Purchase approved
at Committee  
Cumbernauld
Kingfisher, Dowanfield Road
(Zoom) 24
Off the shelf
Purchase approved
at Committee  
Coatbridge 
Former DWP Offices, South
Circular Road (ML5 Limited) 39
Off the shelf
Purchase approved
at Committee  
Gartcosh 
Johnston Rd - Phase 2
(Bellway) 12
Off the shelf
Purchase approved
at Committee  
Sub total   208
Future off the shelf
purchases from
developers  
Total    2737    
Page 116 of 221

Page 117

Appendix 2 - General Outline of Site Locations
• Dalzell Motherwell – approximately 24 units: 
• Former Thornlie Church Hall Site, Caledonian Road, Wishaw – approximately 6 units: 
Page 117 of 221

Page 118

• Prospecthill Road, Ravenscraig – 23 units.   
Page 118 of 221

Page 119

• Torrance Park, Newarthill – Up to 14 units 
Page 119 of 221

Page 120

• Springhill Road, Shotts from Keepmoat – Approximately 22 units over several phases 
Page 120 of 221

Page 121

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  SL / GT / AJ Date 15/02/23 
Former Tenant Arrears Write Off to 31 March 2021 
From  Stephen Llewellyn, Chief Officer of Housing Management  
E-mail telferg@northlan.gov.uk Telephone
Greg Telfer, Business
Finance Manager, 01698
302836 
Executive Summary
The purpose of this report is to present to Committee a summary of outstanding Housing
Rent debts which are deemed uncollectable following all attempts at recovery by the
Housing Rents and Court teams or are considered uneconomically viable to continue
pursuing. In accordance with financial guidelines a provision for expected credit losses has
previously been established for the outstanding accounts highlighted below. 
The debt to be written off relates to former tenancies where the tenancy end date is prior
to 31 March 2021. 
The total recommended write-off is £2,610,389.07 which equates to 1.82% of the total rent
income of £143,783,000. 
Recommendations
It is recommended that Committee:
(1) Acknowledge the decision of the Chief Officer of Housing Management and the
Chief Officer of Finance to write off £317,507.27 under delegated responsibilities; 
(2) Approves the write off of £2,292,882.10 which includes individual debts greater
than £500; 
(3) Approves the write off of credit balances that have arisen in some former tenancy
rent accounts, totalling £39,592.85; 
(4) Remit this report to the Finance and Resources Committee. 
The Plan for North Lanarkshire
Priority  Enhance participation, capacity, and empowerment across our
communities
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
AGENDA ITEM 9
Page 121 of 221

Page 122

1. Background 
1.1 The Housing Service has a turnover in tenancies each year of approximately 3,000 with
tenancies terminating for a variety of reasons.
1.2 The Housing Service has a full rent arrears process in place ranging from reminder
letters at the early stages through to the pursuit of arrears via the courts.  The arrears
process actively pursues debt in both current tenancies and former tenancies and only
ever seeks to write-off debt relating to former tenancies once all avenues of recovery
have been exhausted.
1.3 A whole range of payment methods are available to tenants to enable them to make
payments towards their rents in a timely and consistent manner that suits their
circumstances. These range from Direct Debits, Online Payment facility, Standing
Orders, Post Office, Paypoint and deductions from wages.
1.4 Early intervention and engagement with current tenants who fall into arrears is a key
part of the process to minimise the level debt that exist when tenancies terminate.
1.5 As a result of these proactive efforts, the Council’s collection rate improved from
99.51% in 2015/16 to 99.57% in 2016/17. However, the impact of Universal Credit in
recent years has challenged this with collection rates reducing to 98.81% in 2017/18
and 97.46% in 2018/2019. Due to the efforts of the service in recovering historic debts,
the equivalent figure for 2019/2020 figure was 100.45%. 
1.6 Rent collection levels reduced to 97.9% in 2020/21 following the onset of the Covid-19
pandemic and remained at similar levels during 2021/22 at 97.8%. however, the arrears
position has stabilised through the significant efforts from the Housing Rents team in
securing more direct Universal Credit payments, pursuing other non-Universal Credit
tenant debt and the ongoing benefits of the Universal Credit Assistance Fund and
various rent relief funds made available over the last two financial years. 
1.7 Despite these steps there are a number of debts that are deemed uncollectible or are
considered not economically viable to engage further collection activities and costs.
This annual process of assessing the likelihood of debt non-recovery conforms to
accepted best accounting practice and is a realistic assessment of expected outcome. 
1.8 The impact of various welfare reform measures has seen a significant increase in total
rent arrears from 2013/14 onwards. North Lanarkshire Council moved onto full
Universal Credit status in April 2018 and there has been a significant increase in current
tenant arrears as a result.  This is likely to an adverse impact of the future levels of
former tenant arrears that will be sought for write off. A full Income Maximisation Service
is offered to all tenants to try and mitigate the impact of welfare reform on them. 
2. Report 
2.1 An exercise has been undertaken to identify debt that is now considered to be non-
collectable. In accordance with financial guidelines a provision for expected credit
losses has previously been established for the outstanding accounts highlighted below. 
2.2 There are a number of reasons why the outstanding balances are being written off and
these are summarised below:
a) Liquidation / Sequestration. The debtor has been liquidated / sequestered etc, and
there is no prospect of recovery of funds. 
b) Deceased. The debtor is deceased and there have been insufficient funds within
the estate to meet the sum due.
Page 122 of 221

Page 123

c) Eviction / Abandonment / No Forwarding Address. The debtor has been unable to
be located following eviction or abandonment of their tenancy or have left no
forwarding address and there is no prospect of recovery of funds.
d) Recovery exhausted. All avenues of recovery have now been exhausted via our
internal processes and via the courts and the decision has been taken not to
pursue any further any recovery is considered to be not possible.
2.3 The following tables categorise the value of debt recommended for write-off by cause
and value:
Cause Analysis
Write-Off
Value
£
No of
Tenancies
Average Write-
Off Value
2023
£
Average Write-
Off Value
2022
£
Abandoned 442,890.73 296 1,496.25 1,611.67
Deceased 254,708.03 573 444.52 406.44
Eviction 72,940.30 31 2,352.91 2,860.40
Liquidations/Sequestrations 66,551.97 46 1,446.78 1,787.40
No forwarding address 220,804.67 258 855.83 864.71
Recovery exhausted 1,552,493.37 1,876 827.56 1,062.70
Total 2,610,389.07 3,080 847.53 1,132.82     
Credit Balances (39,592.85) 339 (116.79) (35.0)     
Value Analysis
Write-Off
Value
£
No of
Tenancies
Average Write-
Off Value
2023
£
Average Write-
Off Value
2022
£
< £500 317,507.27 1,933 164.26 185.93
>£500 2,292,882.10 1,147 1,999.03 2,118.45
Total 2,610,389.37 3,080 847.53 1,132.82 
2.4 The write off being proposed to 31 March 2021 represents 1.82% of the total rental
income of £143.783m. The following table outlines the value of the annual former
tenant arrears write-off over the previous 5 years:
Former Tenant
Arrears Written Off
to
Value
(£)
% of income
31 March 2020 3,560,465 2.57
31 March 2019  3,505,183 2.54
31 March 2018 2,408,607 2.09
31 March 2017 1,518,109 1.36
31 March 2016 1,445,028 1.29
Page 123 of 221

Page 124

2.5 The previous tables highlight a reduction in the overall write off value up to 31 March
2021 compared to the peaks over the last two financial years. Importantly, it’s worth
noting that the average value of the write-off has reduced for most categories and
overall. This reflects the continued efforts of the Housing service over the last few years
in relation to early engagement with tenants and offering the income maximisation
service. It is hoped that this positive trend will continue. 
2.6 The Council will continue to seek collection of the outstanding balance if the
circumstances of the debtor alter and recovery is deemed practical.   
3. Measures of success 
3.1  The Service continues to engage in a number of activities aimed at improving collection
rates, reducing debt arising and streamlining the recovery process. The Council will
continue to seek collection of the outstanding balance if the circumstances of the debtor
alter and recovery is deemed practical.   
4. Supporting documentation 
Not applicable. 
Stephen Llewellyn
Chief Office of Housing Management 
Page 124 of 221

Page 125

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
There are no additional financial implications linked to this report for the current
financial year because a corresponding bad debt provision has been included in the
previous year’s accounts.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐   
Page 125 of 221

Page 126

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 126 of 221

Page 127

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref   EK / GT Date 15/02/23 
Housing Revenue Account – 2023/24 Revenue Estimates 
From  Elaine Kemp, Chief Officer of Finance  
E-mail kempe@northlan.gov.uk Telephone 01698 302408 
1. Background 
1.1 Income and expenditure in relation to a local authority’s own direct provision of housing
must be recorded within a Housing Revenue Account (HRA) as set out in the Housing
(Scotland) Act 1987. In addition, this Act sets out the requirement for local authorities
to set an annual budget to support sound financial management and helps ensure that
expenditure is linked to the key priorities of tenants. 
1.2 North Lanarkshire is Scotland’s largest local authority landlord, with a housing stock of
approximately 36,000. The number has reduced marginally over the last year reflecting
the impact of tower re-provisioning, partially offset by additions to the stock through the
Council’s new supply programme and buy back schemes 
Executive Summary
The purpose of this report is to present to Committee information that will enable the
Council to set its Housing Revenue Account (HRA) budget and rent levels for 2023/24. 
Recommendations
It is recommended that Committee:
(1) Recognises the HRA cost pressures detailed in Appendix 1,
(2) Recognises the base budget savings outlined in Appendix 2, 
(3) Considers the allocation of HRA surplus balances as detailed in paragraphs 2.3,
2.4 and 2.5, and
(4) Agrees to review the financial assumptions contained within this report at the
Special Council meeting February 2023 to approve the HRA Revenues Estimates
and rent levels for 2023/24.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
AGENDA ITEM 10
Page 127 of 221

Page 128

1.3 The Council approved its 2022/23 HRA budget of £149m on 16 December 2021 with
£142m (95%) funded by rental income from tenants and £7m (5%) from other fees and
charges. 
1.4 The average 2022/23 weekly rent in North Lanarkshire of £76.50 is the ninth lowest
amongst Scottish local authority landlords and 3.2% below the Scottish local authority
average. The recent Landlord Report published by the Scottish Housing Regulator
shows North Lanarkshire Council’s rents are between 11.7% (for a 1 apartment) and
17.0% (for a 2 apartment) below the Scottish average for all social housing rents. 
1.5 In setting the HRA budget and rent levels in December 2017, the Council agreed to an
average rental increase of 5% for 2018/19 and 5% for the subsequent three years up
to 2021/22. For 2022/23 the rent increase was set at 3%, an average increase of £2.27
per week. 
1.6  Committee has received regular updates on the progress of delivering the Council’s
ambitious plans for housing through the Economic Regeneration Delivery Plan. This
has been further strengthened through The Plan for North Lanarkshire approved in
March 2019 with specific focus on three key programmes of work supported by the
current rent strategy:
• PO13 – New Supply Programme
• PO14 – Tower Strategy
• PO15 – Housing Investment Programme 
1.7 Significant progress to date includes:
• An increase in the target for new supply housing from 2,150 by 2027 to 5,000 by
2035, 
• Completion of 970 new build homes with a further 421 on site. Sites have been
identified and are at various stages of progression for a further 1,346 homes,
• Expansion of the buy back scheme which will allow around 130 properties to be
brough back into use each year. 606 homes have been purchased through the
Council Buy Back Schemes at 9 January 2023,
• The approval, development and ongoing delivery of plans for investment and re-
provisioning of the Council’s tower properties,
• Approval of a 5 year mainstream capital programme from 2021/22 to 2025/26 that
aims to deliver £354m of investment in the Council’s housing stock; greater than
20% increase from the previous 5 year planning period. 
30-year Business Plan
1.8 The 30-year Business Plan included as part of the 2023/24 budget setting process is
shown in Appendix 3. Financial Solutions has worked closely with Housing Property
and Projects and the New Supply Team to confirm future investment targets to support
the development and refinement of financial modelling. The 30-year Business Plan
continues to demonstrate affordability and sustainability of plans based current
assumptions. 
Housing Benefit / Universal Credit
1.9 During the mid point of the current financial year, North Lanarkshire had 23,400 tenants
in receipt of some form of support for their housing costs, representing more than 67%
of tenants. Almost 34% of tenants are now in receipt of the housing cost element of
Universal Credit and a further 33% are in receipt of Housing Benefit.   
1.10  A rent increase would result in some tenants receiving more Housing Benefit and some
existing non-claimants becoming entitled to Housing Benefit. However, unless their
Page 128 of 221

Page 129

circumstances change, most tenants will be liable for the same contribution towards
their rent, with Housing Benefit making up the difference. 
1.11  Tenants currently entitled to the full housing cost element of Universal Credit would
have their Universal Credit payment uplifted to reflect any rent increases up to the Local
Housing Allowance cap. 
1.12 Following approval at the former Housing and Regeneration Committee in November
2019, the Council established the Universal Credit Assistance Fund (UCAF). This was
expanded to include the Covid Hardship Fund in June 2020. Nearly 10,000 tenants
have been supported that would otherwise have fallen into arrears. In addition, in
accessing these funds tenants have been provided with additional support and advice
and signposting to other agencies where required ultimately contributing to longer term
sustainability of tenancies.   
1.13 In addition, funding provided by the Scottish Government to support Covid-19 recovery
and the cost of living crisis has seen a further 719 tenants supported through the Tenant
Hardship Fund and Local Authority Covid Economic Recovery Fund. 
1.14  Together these measures have ensured the Council has seen a stable position for rent
arrears for current tenants with the arrears balance remaining largely unchanged
throughout the current financial year where other landlords are experiencing increasing
current tenant arrears. 
2. Report 
HRA Revenue Estimates
2.1 In assessing the budgetary requirements of the Housing Revenue Account for 2023/24,
a number of variables and factors have to be considered and analysed before
determining the adjustments required in the base budget position. These base budget
adjustments are outlined in Appendices 1 and 2, with the main factors described below: 
2.1.1 Cost Pressures of £10.314m to ensure that the HRA can continue to deliver a
highly performing repairs and maintenance programme, effective housing
management and support and deliver the approved capital programme,
including:
• Employee cost pressures totalling £1.375m, incorporating an adjustment
for the higher than originally budget pay award for 2022/23 and an
anticipated pay award for 2023/24 in line with the Council’s Medium Term
Financial Plan assumptions and the ongoing impact of incremental pay
pressures. The HRA will also benefit from the UK Government’s decision
to reverse increases in National Insurance contributions. 
• The cost of funding capital investment including prior year expenditure and
approved investment targets in line with the existing 30-year Business Plan
(£4.992m). However, this is largely offset by the release of historic recurring
Ambition funding set aside to support capital investment plans (£4.879m).
• Inflationary pressure on repairs and maintenance expenditure linked to
wider economic factors and the increasing price of goods and services
throughout 2022/23 (£6.796m). However, it is anticipated that inflation
impacting on repairs and maintenance will reduce from its current high
levels during 2023/24.
• Other inflationary pressures for energy and other services (£2.030m) 
Page 129 of 221

Page 130

2.1.3 Base Budget Savings are considered each year to ensure that the HRA
continues to direct its resources towards key priorities. Appendix 2 outlines base
budget savings of £0.070m to be implemented by the service in 2023/24. 
2.1.4 The combined impact of these cost pressures and partially offsetting savings is
a funding gap of £10.244m. This can be summarised as follows: 
£m
Cost Pressures (see Appendix 1) 10.314
Base Budget Savings (see Appendix 2) (0.070)  
Funding Gap 10.244 
2.2 A rental increase of 7.15% would be required to bridge the funding gap. 
2.3 Members will be aware of the Scottish Government’s Cost of Living (Tenant Protection)
(Scotland) Act 2022 which introduced a rent freeze for all landlords until 31 March 2023.
The Scottish Government intends to make regulations to lift the rent freeze for the social
housing sector from 1 March 2023. These regulations would allow the Council to
increase rents effective from 1 April 2023. 
2.4 Members will also be aware of the commitment agreed through COSLA to keep rental
increases to an average of less than £5 per week across the country. For North
Lanarkshire Council, maintenance of that commitment will limit the potential rent rise to
circa 6.5% for 2023/24. 
Use of Surplus Balances
2.5 As part of its long-term HRA budget strategy, it is the Council’s policy to set aside
approximately 1% of the HRA budget as a core reserve. As a result, the core reserve
currently stands at £1.470m. 
2.6 In addition, the HRA reserve balances include a Change Management / Risks &
Uncertainty reserve of £5.155m and a reserve balance to support Ambition related
activity of £5.054m. This excludes the surplus currently projected for 2022/23 of
£1.000m. 
2.7 Elected Members are reminded of the Council’s Reserves Policy approved at Policy
and Strategy Committee in January 2020 which aims to ensure that available balances
are managed and utilised in accordance with effective governance principles and
continue to support financial plans which are affordable and sustainable. 
3. Measures of success 
3.1  The Council is required to set a balanced budget for the Housing Revenue Account
with expenditure plans fully funded by income, largely from housing rents. 
3.2 The setting of an annual budget and thereafter monitoring the budget ensures that
tenants can have confidence that the Council and its officers are accountable for the
spending decisions they make. 
Page 130 of 221

Page 131

4. Supporting documentation 
Appendix 1  Cost Pressures 2022/23 
Appendix 2 Base Budget Savings 2022/23 
Appendix 3  30-year Business Plan Summary 
Elaine Kemp
Chief Officer of Finance 
Page 131 of 221

Page 132

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?  
The HRA budget for 2022/23 will ensure that the Council can continue to provide a
highly effective and responsive housing management service for all tenants and
improve the health and wellbeing and economic outcomes of communities through
the delivery of significant additional capital investment in high quality and affordable
social housing. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The financial implications of the 2023/24 Revenue Estimates are outlined
throughout the report.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐
Page 132 of 221

Page 133

If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All activities undertaken by the council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy (September 2012), Services
manage these as part of their overall corporate and service planning process. The
current economic climate, in particular, has the potential to impact upon the Council’s
ability to provide quality services within approved budget levels. 
The Government’s proposals for welfare reform include a number of changes to the
housing benefit system which present significant financial risks to the HRA, including
increasing rent arrears and cash collection costs, combined with lower levels of
rental income. These risks are increased by the current and potentially ongoing
economic impact of the Covid-19 pandemic. These risks will be closely monitored
throughout 2023/24.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 133 of 221

Page 134

Appendix 1
Housing Revenue Account 
Cost Pressures 2023/24 
£000 £000
Employee Costs  
Pay awards  1,479 
Incremental drift 176 
Reduction in National Insurance and other cost
reductions
(280) 
1,375   
Inflationary Pressures  
Housing repairs inflation and stock movements 6,796 
Trading and support service costs  1,250 
Energy costs 1,107 
9,153   
Capital Financing Costs  
Loan charges associated with increased capital
investment
4,992 
Release of Ambition funding to support capital
investment
(4,879) 
113   
Movement and profile of housing stock  (327)   
Cost Pressures Total  10,314 
Page 134 of 221

Page 135

Appendix 2
Housing Revenue Account
Base Budget Savings 2023/24 
£000
Property Costs
Reduced costs associated with both close cleaning 
50
Other Operational Efficiencies
Reduced operational delivery costs linked to office
expenditure and uniforms / protective clothing 
20
Total base budget savings 70 
Page 135 of 221

Page 136

Appendix 3
Housing Revenue Account 
30 Year Business Model Summary 
30 Year
Year 2020/25 2025/30 2030/35 2035/40 2040/45 2046/50 Totals
Average Mainstream Housing Stock 34,930 34,224 33,519 32,779 32,575 32,575
New Build Housing Stock 1,252 2,214 2,986 3,312 3,358 3,358
Average Housing stock 36,182 36,439 36,505 36,091 35,933 35,933
Capital Investment £000 £000 £000 £000 £000 £000 £000
Prudential borrowing 307,405 554,539 649,413 700,776 928,535 536,936 3,677,604
Capital receipts 32 0 0 0 0 0 32
Other receipts / Government Grants 88,654 90,944 55,818 5,457 0 0 240,873
Sub total 396,091 645,483 705,231 706,233 928,535 536,936 3,918,509
CFCR 141,395 125,731 123,231 123,230 123,230 123,230 760,047
Total resources 537,486 771,214 828,462 829,463 1,051,765 660,166 4,678,556
Loan Analysis
Opening debt 324,109 582,972 1,048,747 1,546,458 2,015,481 2,640,866 324,109
Prudential borrowing 307,405 554,539 649,413 700,776 928,535 536,936 3,677,604
Principal repayment - historic debt 42,481 49,673 60,402 73,085 50,336 30,382 306,359
Principal repayment - new borrowing 6,061 39,091 91,300 158,668 252,814 378,499 926,433
Closing debt 582,972 1,048,747 1,546,458 2,015,481 2,640,866 2,768,921 2,768,921
Per house (£) - Closing Stock 16,112 28,782 42,363 55,844 73,494 77,058 77,058
Housing Revenue Account
123,055 241,810 400,970 601,009 808,636 1,061,510 3,236,990
658,790 723,485 801,023 884,577 984,812 1,100,100 5,152,787
781,845 965,295 1,201,993 1,485,586 1,793,448 2,161,610 8,389,777
Other income (71,978) (54,960) (54,960) (54,960) (54,960) (54,960) (346,778)
Balance to be financed by rents 709,867 910,335 1,147,033 1,430,626 1,738,488 2,106,650 8,042,999
Average weekly rent (£) 78.12 97.78 122.82 153.59 186.08 225.49
Rental Income 709,867 910,335 1,147,033 1,430,626 1,738,488 2,106,650 8,042,999
Average Yearly % increase 4.58% 4.66% 4.54% 4.30% 4.20% 3.26%
Capital charges as a % of rent income 17.33% 26.56% 34.96% 42.01% 46.51% 50.39%
5 Year Bands
Loan charges
Other costs
Page 136 of 221

Page 137

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref SL/GT/AN Date 15/02/23 
Revenue Monitoring Report – Housing Revenue Account 
From  Stephen Llewellyn, Chief Officer, Housing Management  
E-mail telferg@northlan.gov.uk Telephone
Greg Telfer, Business
Finance Manager, 07586
010692 
1. Background 
1.1 The Council approved its Housing Revenue Account Budget of £149m on 17 December
2021. This has increased to £154m with the utilisation of the £2.5m reserve set aside
for use within housing repairs, currently under pressure as a result of higher than
anticipated contract inflation (see 2.2.2) and Ambition related virements. 
1.2 The Financial Regulations require Services to remain within their approved budgetary
provision, and to report all significant deviations – defined as the higher of £100,000 or
5% - within their budget monitoring reports. Where significant deviations are identified,
Services must provide explanatory commentary, outline the action required to rectify
such a deviation, and where relevant, must also highlight the impact this has on other
budget headings.
Executive Summary
This report provides a summary of the Housing Revenue Account financial performance
for the period 1 April 2022 to 6 January 2023 (Period 10). The report illustrates the
projected outturn as at 31 March 2023, with major outturn variances highlighted and
explained in accordance with the Council’s approved Financial Regulations. 
The service is currently projecting an underspend of £1.069m for the financial year. 
It is currently anticipated that £1.849m of savings (100%) will be delivered by the financial
year-end. 
Recommendations
It is recommended that Committee:
1) Acknowledges the financial position of the HRA revenue budget 2022/23. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
AGENDA ITEM 11A
Page 137 of 221

Page 138

2. Report 
2.1 Summary of Financial Position 
2.1.1 The service is currently projecting a breakeven position in the financial year. 
2.2 Analysis of Significant Variances 
2.2.1 The Housing Revenue Account currently anticipates an underspend of £1.400m within
Employee Costs due to increased turnover / vacancy savings. This also includes an
additional saving of £0.055m due to the UK Government’s decision to reverse the
increase in National Insurance Contributions. 
2.2.2 In addition, an overspend of £2.607m is anticipated within Property Costs mainly as a
result of increased repair costs (£4.500m) due to the current economic climate and
contract inflation, however with the drawdown of the repairs earmarked reserve of
(£2.500m) this will be reduced to £2.000m. Other overspends include utilities
(£0.337m), void rent loss (£0.150m), grounds maintenance (£0.070m) and rents
(0.050m). 
2.2.3 An underspend of £0.180m is projected within Administration Costs as a result of
reduced legal fees (£0.150m), sheriff officer fees (£0.150m) associated with the
restrictions placed on evictions offset by a overspend within apportioned expenses
(£0.120m). 
2.2.4 The service projects an underspend of £1.634m on borrowing costs as a result of both
proactive treasury management activity reducing average loans funds interest rates
and lower than anticipated capital expenditure 2021/22 outturn. 
2.2.5 An anticipated underspend of £1.107m is anticipated within Ambition funding. Ambition
funding represents budget increases from previous rent rises not yet applied to service
spending linked to increased capital investment. 
2.2.6 An under-recovery of £0.447m is being projected within rental income. This is mainly
due to the number of properties brought back into use through the Open Market
Purchase Scheme being lower than budgeted due to increased demand on the open
market. 
2.2.7 An under-recovery of £0.200m in Fees and Charges due to the freeze in charges for
laundry facilities (£0.100m) since Covid and a reduction in court activity (£0.100m). 
2.3 Earmarked and One-off Resources 
2.3.1 An update of the earmarked reserves is detailed in Appendix 2. When account is taken
of the £1.470m core reserve, and other previously earmarked reserves totalling
£12.871m, the remaining unallocated resources total to £5.155m. 
2.4 2022/23 Budget Savings 
2.4.1 The service uses a variety of information, records and processes to monitor
achievement of its approved budget savings of £1.849m. As at Period 10, it anticipates
100% of its approved savings will be delivered by the financial year-end. 
Page 138 of 221

Page 139

3. Measures of success 
3.1 Service is currently operating within approved budgeted constraints and meeting
required savings targets. 
4. Supporting documentation 
4.1 Appendix 1  HRA Summary 
Appendix 2  Earmarked Reserves / Balance Sheet Provisions 
Stephen Llewellyn 
Chief Officer, Housing Management 
Page 139 of 221

Page 140

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The financial impacts are contained within the report and supporting appendices. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
Page 140 of 221

Page 141

If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
All activities undertaken by the council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy (September 2012), Services manage
these as part of their overall corporate and service planning process. The current
economic climate, in particular, has the potential to impact upon the Council’s ability
to provide quality services within approved budget levels. 
Reflecting the risk analysis matrix included within the Risk Management Strategy, the
Service considers the impact of inflation on key service contracts and the cost of living
crisis presents an ongoing risk to the financial outturn for 2022/23 and this is an
ongoing focus of discussion within the Service and with Financial Solutions. 
To minimise risk, this report has been prepared by service-based Financial Solutions
personnel in consultation with budget managers, in accordance with the Financial
Regulations
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 141 of 221

Page 142

Appendix 1 
FINANCIAL MONITORING REPORT DIVISION : HRA SUMMARY
01 April 2021 to 06 JANUARY 2022 (Period 10) Cost Centre: HRA [H]
COMMITTEE:  HOUSING
CATEGORY BUDGET ACTUAL YEAR TO DATE ANNUAL PROJECTED ANALYSIS
TO DATE TO DATE VARIANCE BUDGET OUTTURN
(1) (2) (3) (4) (5) (6) (10)
£ £ £ £ £
EMPLOYEE COSTS 21,279,807 20,456,333 823,474 FAV 29,312,183 27,912,183 1,400,000 FAV Underspend due to increased turnover savings and National
Insurance Contributions threshold changes
PROPERTY COSTS 39,560,003 41,427,637 (1,867,634) ADV 56,823,690 59,430,690 (2,607,000) ADV Overspend mainly due to increased repair, grounds maintenance,
utility, rental costs and void rent loss. These overspends are
slightly offset by underspends in the garden assistance scheme.
SUPPLIES & SERVICES 410,932 389,222 21,710 FAV 1,182,400 1,182,400 0 - Balanced Budget
TRANSPORT & PLANT 277,324 289,710 (12,386) ADV 367,140 367,140 0 - Balanced Budget
ADMINISTRATION COSTS 1,591,757 1,315,042 276,715 FAV 5,490,900 5,190,900 300,000 FAV Underspends due to decreased legal and sheriff officer fees
PAYMENTS TO OTHER BODIES 125,161 82,447 42,714 FAV 231,120 231,120 0 - Balanced Budget
APPORTIONED EXPENSES 1,444,525 1,444,525 0 - 6,229,960 6,349,960 (120,000) ADV Increased IT Support Costs
CAPITAL FINANCING COSTS 0 0 0 - 22,408,280 20,774,280 1,634,000 FAV Underspend due to proactive treasury management activity
C.F.C.R. 0 0 0 - 27,146,260 27,146,260 0 - Balanced budget
OTHER COSTS 875,044 17,812 857,232 FAV 4,994,497 3,887,497 1,107,000 FAV Ambition
TOTAL EXPENDITURE 65,564,553 65,422,728 141,825 FAV 154,186,430 152,472,430 1,714,000 FAV
OTHER GRANTS 0 0 0 - 0 0 0 - Balanced budget
FEES AND CHARGES 441,844 299,541 (142,303) ADV 7,887,859 7,687,859 (200,000) ADV Under recoveries within laundry charges and court dues / fines
RENTS 99,580,865 99,579,545 (1,320) ADV 143,783,481 143,336,481 (447,000) ADV Under-recovery in Rental Income due to lower OMPS activity
INTEREST 0 0 0 - 15,000 15,000 0 - Balanced Budget
DEPARTMENTAL CHARGES 0 0 0 - 90 90 0 - Balanced Budget
SURPLUS 0 0 0 - 2,500,000 2,500,000 0 - Utilisation of Housing Repairs reserve
INCOME 100,022,709 99,879,086 (143,623) ADV 154,186,430 153,539,430 (647,000) ADV
NET EXPENDITURE (34,458,156) (34,456,358) (1,798) ADV 0 (1,067,000) 1,067,000 FAV
FAV = Favourable variation, underspend etc 362,119            
ADV = Adverse variation, overspend, income under-recovery etc
PROJECTED OUTTURN
VARIANCE
(7)
Page 142 of 221

Page 143

Appendix 2 
DESCRIPTION OF EARMARKED
RESERVES
VALUE OF
EARMARKED
RESERVE
CARRY FORWARD ANALYSIS
VALUE %
(1) (2) (3) (4) (5) (6)
£ £ £
Ambition 5,054,483 889,000 82.4% 4,165,483 Balance required in future years
Welfare Reform 259,869 0 100.0% 259,869 Utilisation of balance to be considered
UCAF 972,633 367,704 62.2% 604,929 Balance required in future years
Hardship Fund 347,660 86,243 75.2% 261,417 Balance required in future years
Enterprise Contract 670,793 670,793 0.0% 0 Budget fully utilised
Rent Restructure 565,469 230,883 59.2% 334,586 Balance required in future years
Housing Repairs 2,500,000 2,500,000 0.0% 0 To fund 2022/23 repairs programme
HRA Capital Programme 2,500,000 0 100.0% 2,500,000 To fund future programme
SUB TOTAL 12,870,907 4,744,623 63.1% 8,126,284
Change Management/Risks & Uncertainty 5,154,712 0 0.0% 5,154,712 Available for future allocation
Core Reserve 1,470,000 0 100.0% 1,470,000 No call anticipated in 2021/22
TOTAL 19,495,619 4,744,623 75.7% 14,750,996
PROJECTED OUTTURN
North Lanarkshire Council
Housing Revenue Account - Earmarked Reserves
01 April 2021 to 06 JANUARY 2022 (Period 10)
Page 143 of 221

Page 144

Page 144 of 221

Page 145

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref  GT/JMcG Date 15/02/23 
Revenue Monitoring Report – Enterprise and Communities 
From  Derek Brown, Depute Chief Executive  
E-mail telferg@northlan.gov.uk Telephone
Greg Telfer, Business
Finance Manager, 07583
010692 
1. Background 
1.1 The Council’s approved Financial Regulations require services to remain within their
approved budgetary provision, and to report all significant deviations – defined as the
higher of £100,000 or 5% - within their budget monitoring reports. Where significant
deviations are identified, services must provide explanatory commentary, outline the
action required to rectify such deviations and where relevant, must also highlight the
impact this has on other budget headings.
Executive Summary 
This report provides a summary of the financial performance of the Enterprise and
Communities service for the period 1 April 2021 to 6 January 2023 (Period 10). The report
illustrates the projected outturn as at 31 March 2023, with major outturn variances highlighted
and explained as per the Council’s approved Financial Regulations. 
In summary, the Enterprise and Communities Service is currently forecasting an overspend
of £3.342m. This is mainly attributable to inflationary pressures (£2.625m), which will be offset
by a corporate contingency, and the reallocation of DigitalNL savings to Services (£0.783m).
The Service continues to work with Business and Digital to progress plans for delivery of these
savings. Note these Period 10 figures exclude the impact of the agreed 2022/23 pay award
which is being reported corporately at this point in time. 
Recommendations
It is recommended that Committee: 
(1) Acknowledges the financial position of the 2023/23 Enterprise and Communities
revenue budget.  
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
AGENDA ITEM 11B
Page 145 of 221

Page 146

1.2 The most significant financial risk facing Enterprise and Communities during 2022/23
is inflationary pressures across a number of service areas including fuel, utilities, food
costs, waste tonnage and contractual inflation on property and road maintenance
contracts. At Period 10 it is forecast that the impact of this is £2.625m and this will
continue to be monitored and reported through service budget monitoring reports
alongside the ongoing impact of the curtailment of non-essential expenditure with the
overall impact managed corporately.   
2. Report 
Summary of Financial Position 
2.1 The Council approved its General Fund Revenue Budget on 17 February 2022, of
which £146.298m (17%) represented the approved Net Revenue Budget for Enterprise
and Communities.  Since then there has been additional budget added for Scottish
Government funding for climate change (£0.075m) and reduction in relation to budget
transfers to other services (£0.168m), the transfer of DigitalNL savings (£1.535m) as
well as a reduction in the National Insurance budget to reflect chances in UK
Government tax policy (£0.140m). These changes result in a revised Enterprise and
Communities Net Budget of £144.530m. 
2.1.1 Enterprise and Communities is forecasting an overspend of £3.342m in relation to
inflationary pressures (£2.625m), and a delay in the delivery of savings linked to the
DigitalNL programme (£0.783m), offset in part with other minor service underspends
across the service (£0.067m). 
2.1.2 Like most organisations, the Council is facing significant pressures linked to the wider
economic outlook and high inflation.  Across the service the current forecast is
unbudgeted costs of £2.625m across energy, waste disposal, fuel, food and materials. 
The Council has set aside approximately £9.400m corporately to support unbudgeted
inflationary pressures faced by services. 
2.1.3 In addition, the Service faces a cost pressure attributable to the delay in implementation
of savings linked to the DigitalNL programme (£0.783m). The service continues to work
with Business and Digital to progress plans for the delivery of these savings. 
2.1.4 Section 2.2 provides commentary on the financial performance of the Service per
division excluding the impacts of inflation and digital savings.  In addition, Appendices
1 to 6 of this report provide further explanation of the significant budget variations
contributing to this outturn position. 
2.1.5 The 2022/23 Enterprise and Communities budget incorporates £3.080m of savings
previously approved by Council on 2 March 2021 with £0.905m of savings (29%)
deliverable within the current financial year. Further information regarding particularly
challenging savings is noted in paragraph 2.4 below. 
Analysis of Significant Variations 
2.2 Excluding the impact of inflation, digital savings and National Insurance changes, the
Enterprise and Communities service currently forecasts a year-end underspend of
£0.067m.  As at Period 10, there are largely compensating variances across the
divisions as follows:   
Page 146 of 221

Page 147

2.2.1 Regulatory Service and Waste Solutions (£1.415m overspend) 
The projected overspend is largely attributable to increased agency and overtime costs
in Waste as a result of delays in recruitment (£0.535m) and a net under-recovery in
Special Uplifts as a result of reduced demand (£0.162m).  Within Fleet there are
increased leasing costs (£0.115m), increased external hire costs (£0.317m) and costs
for vehicle parts (£0.117m) partially offset by vacancy savings (£0.117m).   
2.2.2 Asset and Procurement Solutions (£0.058m overspend)
The division projects an overspend of £0.223m within property costs due to a delay in
the timing of office accommodation savings and loss of rental income (£0.580m) offset
by the use of an ear-marked reserve and employee vacancies. Within the provision of
school meals the service expects an under recovery in paid meal income (£0.142m)
which is fully offset by vacancies across the division. 
2.2.3 Planning and Regeneration (£0.897m underspend)
The underspend within Planning and Regeneration is related to vacancy savings
(£0.342m), additional grant income (£0.105m) and an over-recovery in planning fee
income (£0.403m). 
2.2.4 Environmental Assets (£0.509m Underspend)
The Environmental Assets division is forecasting net vacancy savings of £1.530m partly
offset by increased overtime of £0.350m. This underspend is as a result of difficulties
in recruiting key posts across the division.  Income is also forecast to over recover by
£0.107m mainly from charges in relation to road occupation and construction consents. 
This is partially offset by costs in relation to electric vehicle charging for which there
has been significantly increased demand and unit costs (£0.539m) and consultants
fees to support project delivery (£0.253m). 
2.2.5 Included within the reported outturn is the Council’s trading services. For 2022/23 the
Council approved a surplus budget of £0.596m. The Council must comply with a
statutory requirement to at least break-even over a rolling three year period. The
combined surplus in 2019/20, 2020/21 and 2021/22 was £0.380m. As at Period 10
there are no significant variations to report with regards to trading services. 
2.2.6 Payments to other bodies are detailed in Appendix 3. This expenditure category
accounts for £21.302m with a minor overspend of £0.107m forecasted for 2022/23. 
Earmarked and One-off Reserves 
2.3 Enterprise and Communities was given approval to earmark £17.503m of resources
during the completion of the 2021/22 annual accounts. It is forecast that £10.336m of
the reserve balance will be utilised in 2022/23. A balance of £6.915m is required for the
original purpose in future years. The remaining balance of £0.252m is no longer
required for Business Recovery/Growth. Appendix 4 details the individual Earmarked
Reserves. 
2022/23 Budget Savings and Growth 
2.4.1 The Service uses a variety of information, records and processes to monitor
achievement of its approved budget savings of £3.080m. As at Period 10, £0.905m
(29%) of its approved savings are achievable during the year. The gap of £2.176m
represents digital savings (£1.428m), which has been partially offset by use of an
earmarked reserves in 2022/23 (£0.644m).  A timing delay in office rationalisation
Page 147 of 221

Page 148

(£0.580m) which has been fully offset in-year from temporary rates savings and other
in year property cost savings and vacancy savings within Asset and Procurement
Solutions.  The previously approved reduction in school cleaning (£0.200m) has also
been offset by use of earmarked reserves in 2022/23 and incorporated into the
Council’s Medium Term Financial Planning assumptions. The other staff saving
(£0.076m) is being offset by in year vacancy savings. 
2.4.2 As part of the Council’s investment budgets for 2021/22 and 2022/23, Enterprise and
Communities was allocated £9.228m towards a number of one-off investments.
Appendix 6 highlights in detail how these are being utilised across the Service. 
Management Actions 
2.5 The Service continues to take a range of corrective management actions to ensure it
manages cost pressures. This includes curtailment of non-essential spend and
monitoring of vacancies. 
Change Management 
2.6 The Service expects to use £0.423m of the Council’s Change Management Fund
mainly to support the supply of new bins and materials within Environmental Assets, as
well as redundancy.  Costs within the Change Management Fund are not included in
the Service outturn position 
3. Measures of success 
3.1  The Service continues to operate within the approved budget resources   
4. Supporting documentation 
Appendix 1  Objective Analysis 
Appendix 2  Subjective Analysis 
Appendix 3  Payments to Other Bodies Analysis 
Appendix 4  Status of Earmarked Reserves 
Appendix 5  Challenging Savings 
Appendix 6  One-Off Investments 
Derek Brown
Depute Chief Executive 
Page 148 of 221

Page 149

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Service continues to curtail non-essential expenditure and take management
action to minimise the impact of cost pressures on the Council’s overall financial
position.  
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐   
Page 149 of 221

Page 150

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All activities undertaken by the Council are subject to risk, and in acknowledging
the Council’s approved Risk Management Strategy, Services managed these as
part of their overall corporate and service planning processes. The current
economic climate, in particular, has the potential to impact upon the Council’s
ability to provide quality services within the approved budget levels. 
To reduce other financial risks, this report was prepared by service based Financial 
Solutions personnel in consultation with budget managers, in accordance with the 
Financial Regulations. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 150 of 221

Page 151

Appendix 1
DIVISION OF SERVICE BUDGET ACTUAL ANNUAL PROJECTED MOVEMENT FROM ANALYSIS
TO DATE TO DATE BUDGET OUTTURN % PERIOD 9
(1) (2) (3) (5) (6) (8) (9) (10)
£ £ £ £ %
ENVIRONMENTAL ASSETS 23,747,538 23,765,204 47,357,455 48,022,576 (1.4%) (124,907) Overspend as a result of Utility Inflation/waste disposal/ Digital
savings (£1.148m) and increased usage and price for Electric Vehicle
Charging and consultant fees partly offset by vacancy savings and
increased income for Road occupations and construction consents.
REGULATORY SERVICES AND WASTE SOLUTIONS 25,097,823 25,649,228 37,123,707 39,609,856 (6.7%) (59,958) Overspend as a result of Inflation mainly for Waste Disposal costs
/Fuel/ Vehicles parts and digital savings (£1.071m).  Additional
spend in agency costs/overtime due to recruitment delays parly
offset by vacancies and also reduced demand for Special Uplift
resulting in an under recovery in income.
ASSETS & PROCUREMENT 31,759,645 31,236,648 38,272,520 39,289,023 (2.7%) 13,454 Overspend as a result of Utility and Food Inflation and Digital
Savings (£0.958m) and timing delays in Office Rationalisation
savings and lost rental income.  There is also an under recovery in
paid meal income which is offset fully by vacancy savings.
PLANNING & REGENERATION 4,496,069 3,966,960 9,545,283 8,647,959 9.4% 363,398 Underspend mainly as a result of Vacancy savings, and increased
planning fee income, as well as additional grant income.
HOUSING SOLUTIONS 1,120,851 1,041,532 5,330,715 5,364,201 (0.6%) 53,549 Overspend on Digital savings and Utility inflation (£0.141m),
partially offset by vacancy savings and other minor miscellaneous
budget savings.
HOUSING PROPERTY & PROJECTS 6,158,968 5,976,608 7,495,518 7,533,142 (0.5%) 10,000 Overspend as a result Utility inflation (£0.063m) partially offset by
vacancy savings.
TRADING (623,992) (615,341) (595,542) (595,542) 0.0% (1) Balanced budget
NET EXPENDITURE 91,756,902 91,020,839 144,529,656 147,871,215 255,535
(4) (7)
Enterprise & Communities
Revenue Budget Monitoring Report - Objective Analysis
1st April 2022 - 6th January 2023 (PERIOD 10)
YEAR TO DATE PROVISIONAL
VARIANCE VARIANCE
£
(665,121)
(1,016,503)
(2,486,149)
522,998
529,109
79,319
£
(17,666)
(551,405)
0
736,063 (3,341,559)
897,324
(33,486)
(37,624)182,360
(8,652)
Page 151 of 221

Page 152

Page 152 of 221

Page 153

Page 153 of 221

Page 154

Page 154 of 221

Page 155

Page 155 of 221

Page 156

Budget 2022/23 Enterprise & Communities Appendix 6
One-off Investments Priorities
£'m £'m £'m £'m
Division Priority Area Council Motion Narrative 2022/23
Allocation
Actual To
Date
Projected
Outturn
Future EMR
Request
Approved in March 2022
APS Recover NL Pitch Improvement Programme Targeted investment in the Councils Pitch estate to
upgrade four existing pitches to synthetic surfaces at
Harthill, Moodiesburn, Cleland and Mossend and
replace existing synthetic pitches reaching the end of
their economic life.  This will support increased
participation and letting income.
2.200 0.000 2.200 2.200
Env Assets Community safety Investment in signage and community safety
improvements across North Lanarkshire to support 
the introduction of mandatory 20mph speed limits
around schools, early learning and childcare
establishments.
2.005 0.496 0.496 1.509
Env Assets Cemetery and Footpath Improvements Infrastructure improvements to existing cemeteries
and investment to improve footpaths and
accessibility across the Councils communities, active
travel routes and country parks
1.500 1.500 1.500
Planning & Regen Recover NL - Town Centre Improvements Augmentation of Place Based Investment Programme
to support community-led initiatives for town centre
revitalisation
1.000 0.141 0.141 0.8594
EA / RSWS Recover NL - Environmental Improvements Continuation of RecoverNL environmental
improvements including community led clean-ups,
action on fly tipping and pest control activity
0.850 0.167 0.683
Env Assets Community Sustainability Projects To focus on enhancing sustainability and reducing the
Councils carbon footprint a range of projects will be
delivered including wildflower planting across town
parks and the school estate.  The investment will
include exploring and delivering options for natural
play within communities and investment in green
energy interventions to promote carbon neutrality in
country parks
0.700 0.675 0.675 0.025
Sub Total 8.255 2.979 5.694 4.594
Approved in March 2021
Env Assets Festive Lighting Provision of Xmas Lights in Towns in 2021/22 and
2022/23 at a cost of £0.150 million per year.
0.150 0.114 0.150
Env Assets Road Improvements Targeted Improvement to provide additional
community benefit on schemes such as road
infrastructure improvements, resurfacing and pot
holes, road safety schemes, signage upgrades (i.e.
20mphs) and discrete road improvements
0.133 0.086 0.133
Housing Solutions Anti Social Task Force Provide Antisocial Behaviour Services for Private
Residents in both 2021/22 and 2022/23
0.321 0.11123 0.183 0.13823
RSWS PEST Control Treat defined priority areas over the summer period
to address local concerns.
0.127 0.056 0.127
RSWS Housing Grants to Owner Occupiers - Mixed TeTo provide grants to owner occupiers in mixed tenure
settings to facilitate structural upgrades.
(£0.150m per year in both 2021/22 and 2022/23)
0.243 0.056 0.243
Sub Total 0.973 0.423 0.835 0.138
Total 9.228 3.403 6.530 4.732
One off Investment
Page 156 of 221

Page 157

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref AN/GT Date 15/02/23 
HRA Capital Monitoring Report – 1 April 2022 to 06 January 2023 
From  Brian Lafferty, Chief Officer Housing Property Services  
E-mail Telferg@northlan.gov.uk Telephone
Greg Telfer, Business
Finance Manager, 01698
302836 
Executive Summary
The purpose of this report is to review progress towards agreed spending plans within the
2022/23 HRA capital programmes. 
An overspend of £1.233m is projected for the Mainstream programme, this is due
to increased material costs, approved contractor uplifts and the acceleration of
some programmes, including energy efficiency specific works, to offset contractual risks
elsewhere in the programme and support tenants due to increasing energy costs by
improving the thermal efficiency of their homes. 
The New Build Programme is projecting an overspend of £2.941m. This is mainly due to
the early availability and purchase of land and off the shelf developments not anticipated
in this financial year. This overspend has been partially offset by additional Scottish
Government grant. 
Due to a lack of demand within the Council Buy Back and Mortgage to Rent Schemes, an
underspend of £2.589m is projected. 
Recommendations
It is recommended that Committee:
(1) Acknowledges the financial position of the 2022/23 HRA Capital Programmes.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
AGENDA ITEM 12A
Page 157 of 221

Page 158

1. Background 
1.1. Mainstream Working Programme 
1.1.1 The Housing and Regeneration Committee on 16 February 2022 approved an outline
mainstream programme for 2022/23 based on targeted expenditure of £60.245m, this
has been enhanced by a further £5m to support the Ukrainian Resettlement
Programme tower refurbishment. The overall programme is funded as follows:  
£000
Prudential Borrowing  30,474
Capital Funded from Current Revenue (CFCR)
Scottish Government Grant (Net Zero) 
22,476  
2,000
Total projected resources  54,950 
Slippage allowance  5,295
Mainstream Working programme
Additional Scottish Government Grant (Ukraine) 
60,245       
5,000
Working Programme  65,245 
1.1.2 A grant of £2.42m has been awarded from the Scottish governments Net Zero Fund.
This will be utilised over two financial years with £2m allocated to 22/23 and the
remaining £0.420m included in the 23/24 programme of works. This year’s programme
has been updated to reflect the additional £2m funding. 
1.1.3 Committee also approved an additional £2.5m EESSH allowance to be utilised during
the year if conditions permit. 
1.2. New Build Programme 
1.2.1 The 2022/23 working programme for new build is £39.436m, with 170 completions
expected for the year and is funded as follows:  
£000
Prudential Borrowing 21,788
Capital Funded from Current Revenue (CFCR)   4,670
Scottish Government Grant 12,978
Total projected resources 39,436 
1.3 Council Buy Back Schemes 
1.3.1 As part of the 2022/23 Revenue Estimates, the budget provided for the continuation of
both the Council’s Empty Homes Purchase Scheme (EHPS) and the Open Market
Purchase Scheme (OMPS). This will allow approximately 130 properties to be brought
back into Council use.   
1.3.2 In addition to the EHPS and OMPS, the Mortgage to Rent scheme (MTR) was also
added to the overall Council Buy Back scheme and is anticipating an additional 3
properties to be brought back into council use in 2022/23. 
1.3.3 Funding requirements for 2022/23 for the Council Buy Back Scheme is made up as
follows:
Page 158 of 221

Page 159

£000
Prudential Borrowing 6,828
Scottish Government Grant
Subsidy Income
3,900 
244
Total projected resources 10,972  
1.3.4 Approval was given at the Housing and Regeneration Committee held on the 24
November 2021 to expand the scheme to acquire homes where this would enable
planned common works to progress, with owner occupiers given the option to remain
as a Council tenant. It is estimated that this could enable a further 50 properties to be
purchased during the year. 
The target has currently remained at 130 properties due to the current buoyant property
market which may lead owners to sell on the open market, although every effort will be
made to secure as many suitable properties as possible.   
2. Report 
2.1 Mainstream 
2.1.1 A summary of the mainstream working programme and actual spend to 06 January
2023 (Period 10) is included within Appendix 1, highlighting that at this stage in the
financial year: 
• £55.819m (93% of the working programme) has been legally committed; and
• £41.042m (75% of the projected resources) has been spent. 
2.1.2 Legal commitments and spend to date are higher than historic trends and the
programme is projected to overspend by £1.233m due to increased material costs,
approved contractor uplifts and acceleration of some works to offset contractual risks. 
2.1.3 In order to support the Scottish Government’s Ukraine Resettlement Programme, the
Council is recommissioning two towers (Birkshaw, Wishaw and Highcoats, Coatbridge)
previously being prepared for demolition in 2023/24. Appendix 1 has been updated to
show the projected costs of £5.255m which will be fully offset fully by Scottish
Government funding with no additional cost to the Council.
2.1.4 It is anticipated that the full £2m Net Zero grant allocated to this financial year will be
fully spent. 
2.2 New Build 
2.2.1 A summary of projected outturn spend on the new build programme is contained within
Appendix 2. Projected spend totals £42.377m, an overspend of £2.941m, and is funded
by Prudential Borrowing, CFCR and Scottish Government Funding. 
2.2.2   There are currently nine projects on site at Lindsaybeg Road, Chryston; Dykehead
Road, Airdrie; Northburn Place, Airdrie; Community Road, Bellshill; Former Orrs
Page 159 of 221

Page 160

Building, Airdrie (off-the-shelf purchase); Castlehill Road, Wishaw; Berwick Street,
Coatbridge; Gateside Farm, Stepps (off-the-shelf purchase); and Ravenscliff Road,
Ravenscraig. 
2.2.3    Following a revision of Scottish Water’s surface water policy, the Council is continuing
to progress financially viable solutions for connection issues that will allow a contract
award to be made at Laburnum Road, Viewpark. 
2.2.4    To date, 970 new build homes have been completed as part of the Council’s ambitious
new supply programme of 5,000 new homes. Currently, 421 homes are under
construction, with 117 homes expected to complete in 2022/23, subject to current
delays. 
2.2.5    Sites have been identified and approved at Committee for a further 1,346 homes across
35 sites, with site investigations, title checks and design development on these sites
progressing. 
2.2.6    The Council has appointed contractors who are progressing layouts and designs for
several sites, with site investigations underway. 
2.3       Council Buy Back Scheme
2.3.1   A summary of projected outturn spend on the Council Buy Back Schemes is also
contained within Appendix 2.  Projected spend currently totals £6.366m collectively
between the Council buy back schemes, £6.098m attributable to EHPS and OMPS and
£0.268m to the MTR scheme. This is funded by Prudential Borrowing, Scottish
Government Funding and Subsidy Income. 
2.3.2   The original target of 130 homes to be purchased through the OMPS in 2022/23 has
been revised and the current projection is now 60 homes. This is due to lack of demand
along with more homes selling on the open market. This will be reviewed over the
remaining periods. 
2.3.3   To date, 44 properties have been brought back into use as affordable housing in
2022/23. A Scottish Government grant contribution of £1.5m has been secured for
2022/23, with further funding to be made available depending on progress. 
2.3.4    Agreement has been reached with the Scottish Government to apply a sliding scale for
buy back grant funding, based on property value as follows:
• £35k grant per unit, for homes up to an £80k purchase price
• £40k grant per unit, for homes with an £80-£90k purchase price
• £45k grant per unit, for homes with a £90-£100k purchase price
• £50k grant per unit, for homes with a purchase price above £100k 
Previously, any buy back purchases were eligible for a maximum grant contribution of
£30k per unit. The new scale is applicable to any buy back grant claimed from 6
December 2022.
2.3.5    The final revenue cost of borrowing will equate to a potential drawdown of £0.196m in
2022/23 from the amounts set aside for “Our Ambition”
Page 160 of 221

Page 161

3. Measures of success 
3.1  The successful delivery of the HRA capital programmes, providing high quality housing
stock.     
4. Supporting documentation 
4.1 Appendix 1 – 2022/23 HRA Capital Programme – Mainstream Budget Monitoring
Period 10 
Appendix 2 – 2022/23 HRA Capital Programme – New Build / Council Buy Back
Scheme Budget Monitoring Period 10 
Brian Lafferty
Chief Officer, Housing Property Services  
Page 161 of 221

Page 162

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
The financial implications are outlined throughout the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☒ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
Page 162 of 221

Page 163

If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All activities undertaken by the Council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy (September 2012), Services
manage these as part of their overall corporate and service planning processes. The
current economic climate has the potential to impact upon the Council’s ability to
provide quality services within approved budget levels. 
To minimise risk this report has been prepared by service based Financial Solutions
personnel in consultation with budget managers, in accordance with Financial
Regulations.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 163 of 221

Page 164

Appendix 1 
Page 164 of 221

Page 165

Appendix 2 
Page 165 of 221

Page 166

Page 166 of 221

Page 167

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  GT/JM Date 15/02/23 
Enterprise and Communities – Capital Monitoring Report 
From  Derek Brown, Depute Chief Executive  
E-mail telferg@northlan.gov.uk Telephone
Greg Telfer, Business
Finance Manager, 07583
010692 
1. Background 
1.1 Financial year 2022/23 is the second year of the 5 year capital programme which was
initally approved by the Policy and Strategy Committee on 18 March 2021.   
Executive Summary 
This report highlights the financial performance of 2022/23 Enterprise and Communities
capital programme for the period ended 6 January 2023 (Period 10). 
In summary the Service has a total capital budget of £159.192m.  At this stage in the
financial year the service is currently reporting a requirement to reprofile £23.053m to future
years of the current capital planning period. The Council’s Strategic Capital Delivery Group
(SCDG) has approved these reprofiling requests under delegated powers and the impact
will be reflected in future reports. (see Appendix B).  The requirement to reprofile is largely
attributable to current market conditions on capital procurement processes resulting in later
than anticipated start dates for projects and continuing issues contracts are experiencing
with the availability of labour and materials. 
Further explanation of project variances and management action taken by the Service is
included within the main report and attached appendices. 
Recommendations
It is recommended that the Committee: 
(1) Acknowledges the financial position of the 2022/23 Enterprise and Communities
capital programme. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
AGENDA ITEM 12B
Page 167 of 221

Page 168

1.2 The Enterprise and Communities 2022/23 capital programme of £157.168m was
approved by the Policy and Strategy Committee on 17 March 2022. The programme
has since been increased by £5.796m relating to carry forwards from 2021/22 and
reduced due to £14.505m reprofiling to 2023/24 approved at the Council’s SCDG on
15 September 2022.  In addition, a further £10.734m has been received in external
funding giving an overall working capital programme of £159.192m. 
1.3 The Community Investment Fund Annual Update was presented to Policy and Strategy
Committee on 29 September 2022. The report highlighted a reduction in projected
resources as a result of higher borrowing costs and lower than anticipated Council Tax
growth. Consequently, there was a requirement to reduce the current 5-year capital
investment programme by £22.076m. The programme amendments were approved at
Policy and Strategy Committee on 1 December 2022. SCDG will work with services to
identify the profile of expenditure reductions across the remaining years of the capital
programme which may have an impact on resources available during 2022/23. 
1.4 The Council’s approved Financial Regulations required services to remain within their
approved budgetary provision, and to report all significant deviations – defined as the
higher of £0.100m or 5% - within their budget monitoring reports.  Where significant
deviations were identified, services must provide explanatory commentary, outline the
action required to rectify such deviations and where relevant, must also highlight the
impact this has on other budget headings. 
2. Report 
2.1 At Period 10 the service is reporting a requirement to reprofile £23.053m of expenditure
to future years of the current capital planning period. This reprofiling request has been
approved at the Council’s SCDG on 2 February 2023 and will be refected in future
monitoring reports (see Appendix B).  Capital budgets and expenditure are summarised
into Project/Themes (see Appendix A) 
2.2 Assets and Procurement Solutions (£9.658m Underspend) 
The division has a number of in year variances across programmed activity. The most
significant variance relates to the profile of expenditure in the Community Hub projects
at Chryston and Carnbroe where updated contractor work programmes indicate
£2.286m of expenditure will now be incurred in the new financial year. 
In addition, an in year underspend of £1.610m is expected within Carbon Management
projects as the service has sought to finalise the programme of work and select a
preferred bidder. Expenditure will now be incurred during 2023/24. 
The ASN / Social Work Rationalisation is forecast to underspend by £2.009m this
financial year which is mainly for the Bothwellpark project.  The planning application for
this project has been submitted and progress has been made to formalise the design,
however, it is now anticipated this project will complete late 2023.  In addition, to allow
more accurate scoping works at the Children’s Houses, the cost profile of these works
have also been reprofiled to 2023/24. 
Within Demolitions there is a forecast underspend of £0.537m due to revised timing of
the demolition of the Fleming House following ongoing negotiations regarding
relocating the rooftop antennas.  There are also further in year underspends of £0.221m
forecast with the 1140 Programme and £0.276m within Sustainable Estate due to the
profiling of costs. In addition, an underspend of £0.211m is expected within future
Page 168 of 221

Page 169

capital receipts, work contractors have now been appointed for Mid-Forrest Community
Growth Area and Napier Residential Site so these funds will be spent next financial
year. These are offset in part as projects have been accelerated within Office
Rationalisation (£0.455m) 
These underspends are also partially offset by a combination of compensating
variances within the Maintaining Existing Assets Category. Programme acceleration in
Health & Safety Works (£0.580m) due to increased costs via tender award and
acceleration of required power generator works. Toilet Upgrades are forecast to
overspend (£0.415m) as tender returns have come in higher than anticipated. In
addition, projects have been accelerated within major maintenance on the Time
Capsule Moveable Flooring (£0.300m), and café works at Bellshill Cultural Centre
(£0.197m) to assist in managing the overall variance. Re-wire works (£0.863m) and re-
roofing projects (£0.317m) are expected to underspend as jobs are now spanning the
financial years. 
The Outdoor Education and Outdoor Spaces theme is reporting an in-year underspend
of £3.165m relating to the receipt of additional one-off investment allocations where the
spend in now forecast to fall into 2023/24.  In addition, a request has been made to
approve a budget virement from the Demolitions theme (£0.500m) to support additional
costs associated with the pitch programme (See Appendix B). 
2.3 Environmental Assets (£7.196m underspend)
Infrastructure and Transportation Improvements theme is forecasting an underspend
of £2.506m.  This is mainly as a result of maximising external funding in Traffic Signals
and Pedestrian Crossings (£1.754m), Active Travel Infrastructure (£0.171m), Public
Transport Infrastructure (£0.462m) and Drainage and Flood Risk Management
(£0.117m). These underspends will be used to offset partly the overspend within the
Horsely Brae project of £0.357m.  The team are actively completing the tender process
and works within this theme will now be completed in 2023/24. There is also an
underspend in staffing costs (£0.360m) within this area due to recruitment issues which
means there are a number of vacancies within the design team. 
Cemeteries/Tree Infrastructure is projecting an underspend of £2.711m which is
directly linked to the Cemetery Development works at Pather Fam where ground issues
have meant a delay in the tendering process.  The tender is now expected to be
awarded February 2023 and works commencing early in the new financial year.
There is also an underspend of £1.973m anticipated in the Roads Asset Management
theme this financial year. Within Street Lighting and in-year underspend of £0.953m is
attributable to contractor cashflows following tender award. The works will now span
into 2023/24.  There has also been a delay in the works commencing at the A73 Carlisle
/ South Biggar Road project which has meant, although the contract has been awarded
this financial year, £0.629m of works is expected to slip to 2023/24.  In addition to this
£0.150m has been identified as a capital saving on this project due to tender prices
being lower than anticipated.  Works at The Loaning in Motherwell are also expected
to be completed next financial year as the service incorporates feedback from ongoing
public consultation (£0.240m).  
Greenspace is currently reporting an underspend of £0.134m. £0.112m has been
identified as a capital saving and the remaining £0.022m is being held to offset a
staffing pressure within Parks Masterplans due to the temporary recruitment of an
additional post this year.
Page 169 of 221

Page 170

£0.106m is overspent within Replacement of Plant and Machinery and a request is
included within appendix B for these funds to be accelerated from 2023/24.
2.4 Planning and Regeneration (£2.981m underspend)
The service anticipates as in year underspend in the City Deal programme of £1.296m
mainly as a result of delivery timescales for the completion of required work for the
West Coast Main Line in partnership with Network Rail.  This expenditure forecast now
falls into the first quarter of 2023/24. 
In addition, there are a number of in year underspends in Ambition programmes
totalling £1.685m. Similar to other areas of the service, in order to maximise external
funding some of the Council funded elements of these projects will now occur later than
anticipated in the financial year and will now straddle into the 2023/24. 
2.5 Regulatory Services and Waste Solutions (£3.218m underspend)
The majority of the underspend relates to the Bellshill Depot (£1.818m) as a result of
delays in commencing construction with planned spend continuing into 2023/24. The
remaining underspend relates to the Vehicle Replacement Programme in Fleet
(£1.399m) and comes as a result of ongoing review of fleet requirements across the
Council and the timescales to get delivery of new vehicles.  A request has been made
to vire these funds into the Bellshill Depot project (See Appendix B). 
3. Measures of success 
3.1  The Service aim is to be in a balanced budget position at financial year-end 
4. Supporting documentation 
4.1 Appendix 1 Summary Expenditure by Project/Theme 
4.2 Appendix 2 Budget Virement Requests 
Derek Brown
Depute Chief Executive 
Page 170 of 221

Page 171

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Service aims to operate within approved funding levels and utilise budget
virements to support emerging issues and mitigate variances across budget heads. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐   
Page 171 of 221

Page 172

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All activities undertaken by the Council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy, Services managed these as part of
their overall corporate and service planning processes.  The current economic
climate, in particular, has the potential to impact upon the Council’s ability to provide
quality services within approved budget levels. 
To minimise risk this report was prepared by service based Financial Solutions
personnel in consultation with budget managers, in accordance with the Financial
Regulations. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 172 of 221

Page 173

Appendix 1
Enterprise & Communities Capital Programme 2022/23 1.754
Theme Expenditure Summary
1st April 2022 - 6th January 2023 (PERIOD 10)
Thematic Category
Revised
Budget
£
Actual
£
Committed
£
Uncommitted
£
Projected
Outturn
£
Outturn
variance
£
ASSET & PROCUREMENT SOLUTIONS
Maintaining Existing Assets - windows, re-roofing, re-wiring
and condition survey works for the Council's building assets
8,857,868 3,977,165 8,491,779 533,174 9,024,953 (167,085)
Carbon Management 2,126,769 334,779 334,779 181,783 516,562 1,610,207
Office Rationalisation (16,849) 63,151 408,151 29,660 437,811 (454,660)
Shared Campus 0 0 0 0 0 0
Leisure Development 1,311,349 1,558,329 1,397,260 13,300 1,410,560 (99,211)
Health & Wellbeing & Digital Classrooms 411,693 201,509 424,282 38,490 462,772 (51,079)
Rationalisation including ASN & Social Work 3,599,432 974,229 1,560,316 30,000 1,590,316 2,009,116
Curriculum Development 863,951 512,572 806,408 0 806,408 57,543
Sustainable Estate 1,474,242 505,720 809,021 389,555 1,198,576 275,666
Outdoor Education and Outdoor Spaces 3,928,176 377,289 762,289 0 762,289 3,165,887
Future Capital Receipts Investments 985,791 153,715 774,434 0 774,434 211,357
Design Fees 1,525,383 582,415 1,469,176 0 1,469,176 56,207
1140 Early Learning and Childcare Expansion 2,191,802 1,208,798 1,298,546 672,189 1,970,735 221,067
Demolitions 1,010,383 83,002 170,640 302,691 473,331 537,052
TOTAL ASSET & PROCUREMENT SOLUTIONS 28,269,990 10,532,673 18,707,083 2,190,841 20,897,924 7,372,067
TOWN AND COMMUNITY HUBS
Town and Community Hubs 49,860,100 32,766,273 46,741,429 832,324 47,573,753 2,286,347
TOTAL TOWN AND COMMUNITY HUBS 49,860,100 32,766,273 46,741,429 832,324 47,573,753 2,286,347
ENVIRONMENTAL ASSETS
Infrastructure and Transportation Improvements 10,577,727 4,416,950 7,686,662 385,039 8,071,701 2,506,026
Greenspace infrastructure Health & Wellbeing 1,388,179 210,047 385,337 868,677 1,254,014 134,166
Parks Masterplans 2,911,807 1,270,652 1,505,565 1,428,786 2,934,351 (22,545)
Environmental Assets replacement of plant and machinery 666,997 507,901 719,981 52,620 772,601 (105,604)
Cemeteries/Tree Infrastructure 4,319,311 136,770 450,005 1,158,026 1,608,030 2,711,281
Road Asset Management including street lighting, road
improvements and gateway signage 14,590,454 6,267,830 10,901,604 1,716,322 12,617,926 1,972,528
Bin rationalisation project and replacement 137,742 36,374 137,742 0 137,742 0
Play Area Equipment and surface renewal 213,145 112,247 213,145 0 213,145 0
TOTAL ENVIRONMENTAL ASSETS 34,805,362 12,958,771 22,000,042 5,609,467 27,609,510 7,195,852
REGULATORY SERVICES & WASTE SOLUTIONS
Contaminated Land and Pollution Control 368,376 349,212 349,212 19,164 368,376 0
Vehicle Replacement Programme 1,448,444 49,040 49,040 0 49,040 1,399,404
Depot Rationalisation and Investment 3,509,776 731,095 1,691,465 0 1,691,465 1,818,311
HWRC Equipment 464,700 186,387 186,387 278,313 464,700 0
TOTAL REGULATORY SERVICES & WASTE SOLUTIONS 5,791,296 1,315,733 2,276,104 297,477 2,573,581 3,217,715
PLANNING & REGENERATION
Economic Regeneration 18,450,305 2,951,546 5,194,035 11,571,387 16,765,422 1,684,882
City Deal 18,453,423 9,971,646 16,657,815 803,622 17,461,437 991,986
Enterprise Projects 2,785,022 1,178,124 1,235,991 1,244,814 2,480,805 304,217
Antonine Wall Project 215,013 180,096 184,910 30,103 215,013 0
TOTAL PLANNING & REGENERATION 39,903,763 14,281,412 23,272,751 13,649,926 36,922,676 2,981,085
HOUSING PROPERTY & PROJECTS
Water Quailty / Ventilation 561,862 554,792 554,792 7,070 561,862 0
TOTAL HOUSING PROPERTY & PROJECTS 561,862 554,792 554,792 7,070 561,862 0
TOTAL ENTERPRISE & COMMUNITIES 159,192,373 72,409,655 113,552,201 22,587,106 136,139,306 23,053,066
YTD OUTTURN
Page 173 of 221

Page 174

APPENDIX B
Enterprise & Communities Capital Programme 2022-23 - Committee Budget Virement Requests
1st April 2022 - 6th January 2023 (PERIOD 10)
Virement request
Virement
amount
£
Thematic category From Thematic category To Committee
approval required
Acceleration
Office Rationalisation 454,660 Office Rationalisation Year 3 Office Rationalisation Year 2 No
Maintaining Existing Assets - windows, re-roofing, re-
wiring and condition survey works for the Council's
building assets 167,085 Maintaining Existing Assets - windows, re-roofing, re-wiYear 3 Maintaining Existing Assets - windows, re-roofing, re-wYear 2 No
Leisure Development 99,211 Leisure Development Year 3 Leisure Development Year 2
Environmental Assets replacement of plant and
machinery 105,604 Environmental Assets replacement of plant and machinYear 3 Environmental Assets replacement of plant and machinYear 2 No
Sub Total Acceleration 826,560
Transfers to future years
Town and Community Hubs 2,286,347 Town and Community Hubs Year 2 Town and Community Hubs Year 3 No
Rationalisation including ASN & Social Work 2,009,116 Rationalisation including ASN & Social Work Year 2 Rationalisation including ASN & Social Work Year 3 No
Carbon Management 1,610,207 Carbon Management Year 2 Carbon Management Year 3 No
Sustainable Estate 275,666 Sustainable Estate Year 2 Sustainable Estate Year 3 No
1140 Early Learning and Childcare Expansion 221,067 1140 Early Learning and Childcare Expansion Year 2 1140 Early Learning and Childcare Expansion Year 3 No
Future Capital Receipts Investments 211,357 Future Capital Receipts Investments Year 2 Future Capital Receipts Investments Year 3 No
Outdoor Education and Outdoor Spaces 3,200,000
Cemeteries/Tree Infrastructure 2,711,281 Cemeteries/Tree Infrastructure Year 2 Cemeteries/Tree Infrastructure Year 3 No
Infrastructure and Transportation Improvements 2,125,366 Infrastructure and Transportation Improvements Year 2 Infrastructure and Transportation Improvements Year 3 No
Road Asset Management including street lighting, road
improvements and gateway signage 1,822,527 Road Asset Management including street lighting, road Year 2
Road Asset Management including street lighting,
road improvements and gateway signage Year 3 No
Depot Rationalisation and Investment 1,818,311 Depot Rationalisation and Investment Year 2 Depot Rationalisation and Investment Year 3 No
Vehicle Replacement Programme 1,399,404 Vehicle Replacement Programme Year 2 Vehicle Replacement Programme Year 3 Yes
Economic Regeneration 1,684,882 Economic Regeneration Year 2 Economic Regeneration Year 3 No
City Deal 991,986 City Deal Year 2 City Deal Year 5 No
Enterprise Projects 304,217 Enterprise Projects Year 2 Enterprise Projects Year 5 No
Sub Total Transfer to future years 22,671,734
Internal Virement
Demolitions 500,000 Demolitions Year 2 Outdoor Education and Outdoor Spaces Year 3 No
27,552,223
Page 174 of 221

Page 175

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref: SL Date: 15 February 2023 
Contract Award for Provision of Domestic Flooring 2023 - 2027 
From   Stephen Llewellyn, Chief Officer, Housing Management  
E-mail Llewellyns@northln.gov.uk Telephone 01698274192/
07939280680 
Executive Summary 
Committee is asked to approve the award of a contract for the Provision of Domestic Flooring 2023
- 2027(the ‘Contract’) to Spruce Carpets Ltd. 
The Contract is for a period of 48 months anticipated to commence on 20 February 2023. 
The value of the Contract shall not exceed eight hundred thousand pounds Sterling (£800,000
exclusive of VAT). 
Recommendations 
It is recommended that Committee approves the award of the Contract to Spruce Carpets Ltd. at the
maximum value of eight hundred thousand Pounds Sterling (£800,000) exclusive of VAT 
This recommendation follows the completion of a procurement procedure, where the tender
recommended for award has been evaluated as providing the most economically advantageous
tender in terms of cost and quality for the Council. 
The Plan for North Lanarkshire 
Priority Improve the health and wellbeing of our communities 
Ambition Statement (12) Ensure our residents are able to achieve, maintain, and recover their
independence through appropriate supports at home and in their
communities 
1. Background 
1.1 The requirements of the Contract have never been contracted before by the Council therefore
historical contract information is not available. 
AGENDA ITEM 13A
Page 175 of 221

Page 176

1.2  Under terms of the Housing (Scotland) Act 1987, the Housing Solutions Team have
responsibility for providing temporary housing solutions (temporary accommodation) for
service users who have presented to the authority as homeless. As the majority of applicants
applying as homeless are presenting in a crisis situation, they do not have any household
items available for their use at the time of presentation, therefore the council provide
furnished temporary accommodation pending the outcome of their homeless persons
application. 
1.3 When furnishing the temporary accommodation different types of flooring are used
throughout the property, including carpets in the living room, bedrooms and halls and vinyl
flooring within kitchens and bathrooms. This call off contract would be used to obtain the
flooring required for temporary accommodation throughout North Lanarkshire. 
1.4 We may also on occasions use this contract to purchase flooring which is required to be
replaced within communal areas of our retirement housing complexes or in any other council
properties, as required, following refurbishment works. 
1.5 Scotland Excel (SXL) established a framework for Domestic Furniture & Furnishings in 2019.
The Council confirmed its participation in the Framework Agreement to SXL and
subsequently SXL tendered on our behalf. This framework comprised of 2 Lots, Lot 1 New
Furniture and Lot 2 Reuse Furniture, with 7 suppliers (5 in Lot 1 & 2 in Lot 2) all able to service
North Lanarkshire Council. 
1.6  It is the intention to direct award to the sole supplier of flooring in Lot 2, (Reuse),Flooring – of
the Scotland Excel Framework for Domestic Furniture & Furnishings 2019. 
2. Report 
2.1 A user intelligence group (the ‘UIG’) of technical and procurement representatives was
formed to review technical specifications, discuss trading processes, market conditions and
trends, ways to maximise community benefits and sustainability and to agree the
procurement strategy that would deliver maximum benefit for the Council via the Contract. 
2.2 The initial estimated value of the Contract dictated that the procurement procedure be
undertaken in accordance with the Public Contracts (Scotland) Regulations 2015. 
2.3 The procurement procedure was undertaken as a “Direct Award” from the Scotland Excel
framework agreement for Domestic Furniture & Furnishings 2019; Lot 2- Reuse Furniture. 
2.4 Further details of the procurement procedure is provided in Appendix 2 and the SME status
and location of all tenderers is located within Appendix 3. 
2.7 The value of the Contract is eight hundred thousand Pounds Sterling (£800,000) exclusive of
VAT including any option to extend the Contract. 
2.8 The costs associated with contract delivery will be contained within the Revenue and Capital
budget for Housing Services. 
Page 176 of 221

Page 177

Price Savings / Increases 
2.9 The pre-tender whole life estimate for the Contract was £800,000 
This estimate has been provided following a review of annual spend on flooring within our
housing localities and averaging spend across the localities. We have also considered future
potential increases in material and labour costs when estimating spend forecasts. 
Price Stability 
2.10 Pricing in this contract will remain static for the first year with potential increases being applied
in future years following discussion with the service. 
Community Benefits 
2.11.1 The Council is committed to maximising the delivery of community benefits. The procurement
included a community benefit requirement, this approach is designed to deliver local
community benefits where possible. 
2.11.2 Within their tender, Spruce Carpets Ltd. committed to deliver the following community
benefits within the Contract:  
Community Benefit Type Quantity
Committed
Business Monitoring and Advice to support an SME / Social
Enterprise / Voluntary Organisation. 2
Financial Support for a Community Project / Organisation 2
Business Event / Briefing to promote supply chain opportunities 2
Non-financial support for a Community Project /Organisation  2
Educational Visits 2 
2.11.3 The council will seek confirmation of Community Benefit Deliverables for this call off contract
from the sole supplier. 
Fair Work First  
2.12 Within their tender submission, Spruce Carpets Ltd advised that they commit to the following
areas of the Scottish Governments “Fair Work First” initiative: They will pay the real living
wage to all employees; they are committed to equal opportunities and actively support flexible
working patterns. Other benefits include training and development opportunities and
healthcare. 
Page 177 of 221

Page 178

Contract Strategy 
2.13 Officers from Housing Services, Central Housing Solutions Team will be responsible for
managing the Contract which will be undertaken in accordance with the Councils agreed
approach to contract and supplier management. 
3. Measures of success 
The Contract will deliver the following outcomes; 
3.1 In providing floor coverings within council owned temporary accommodation which is offered
to applicants who present to the council as homeless, this contract will contribute to ensuring
the Housing service meet their statutory obligation in terms of the Housing (Scotland) Act
1987. 
3.2 In calling off from Lot 2 – Reuse Furniture of the SXL Framework the contract will contribute
to government and local targets set in reducing the local and global environmental impact of
our consumption and production by reusing flooring that would otherwise be transferred to
landfill sites. 
4. Supporting documents 
Appendix 1 Summary of Tender Evaluation Process
Appendix 2 Summary of Procurement Process
Appendix 3 SME Status and Location of All Tenderers 
Stephen Llewellyn
Chief Officer, Housing Management 
Page 178 of 221

Page 179

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
Page 179 of 221

Page 180

Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
In using this contract we will be contributing to both government and local targets set
in reducing the local and global environmental impact of our consumption and
production by reusing flooring that would otherwise be transferred to landfill sites.
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g., Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10  Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes  ☐  No   ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 180 of 221

Page 181

Appendix 1 – Summary of Tender Evaluation Process 
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Contract
Award (Y / N)
1 Spruce Carpets Limited n/a Yes 
Page 181 of 221

Page 182

Appendix 2 – Summary of Procurement Process 
Response
CPT Contract Reference Allocated: NLC-CPT-22-101
Tender Platform Utilised: PCS-Tender (PCST)
Procurement Procedure Utilised: Direct Award
Governing Legislation / Regulations: Public Contracts (Scotland) Regulations 2015
Date Contract Strategy Approved: 22 November 2022
Date Contract Notice Published: 10 January 2023
Tender Return Deadline: 16 January 2023
Number of Tenders Received: One
Where Only One Tender Is Received, Why?:
This was a direct award from the Scotland Excel
Framework for ‘Domestic Furniture & Furnishings
2019’, ‘Lot 2 – Reuse Furniture’. Lot 2 within this
framework covers four product categories one of
which is flooring, and Spruce carpets were the sole
contractor for flooring within this Lot.
Tenders Received from SME’s: One
Tenders Received from NLC Based Tenderers:  None
Number of Non−compliant Tenders: None
Number of Compliant Tenders: One
Number of Recommended Tenderers: One
Basis of Contract Award: Quality: 50% Price: 50%
Evaluation Team: Officers from Procurement and Housing Operations
Anticipated Contract Start Date: 20 February 2023
Total Contract Period (Months): 48 months
Maximum Total Contract Value: £800,000 
Page 182 of 221

Page 183

Appendix 3 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
Spruce Carpets Ltd Small Glasgow, Glasgow
City Council 
Page 183 of 221

Page 184

Page 184 of 221

Page 185

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☒ Yes ☐ No
Ref: SS/SL Date: 15 February 2023 
Contract Award for Replacement of Windows and Doors (2023 – 2025) 
From  Chief Officer of Housing Property Services 
E-mail laffertyb@northlan.gov.uk Telephone Siobhan Starbuck, Contract Strategy
Manager – 07583 062739 
Executive Summary 
The Housing Committee (the Committee”) is asked to approve the award of a contract for the
Replacement of Windows and Doors (2023 – 2025) (the ‘Contract’) to: 
• Lot 1 – Walker Profiles Limited 
• Lot 2 – Belac Group Limited 
The Contract is for an initial period of nine (9) months anticipated to commence on 03 April 2023.
The Council reserves the right to extend the Contract for additional periods up to a maximum of a
further 12 months. 
The maximum value of the Contract shall not exceed Fifteen Million Pounds Sterling
(£15,000,000.00) exclusive of VAT. The value of the Contract is split across both lots with
£10,000,000 applicable to Lot 1, and £5,000,000.00 applicable to Lot 2. As a “Measured Term
Contract” form of agreement, the value of the Contract is pertinent to demand therefore there is no
guarantee that the Councils spends any or all of the awarded contract value. 
Recommendations 
It is recommended that Committee approves the award of the Contract at the maximum value of
Fifteen Million Pounds Sterling (£15,000,000.00) exclusive of VAT to: 
• Walker Profiles Limited for Lot 1 up to the maximum value of Ten Million Pounds Sterling
(£10,000,000.00) exclusive of VAT 
• Belac Group Limited. for Lot 2 up to the maximum value of Five Million Pounds Sterling
(£5,000,000.00) exclusive of VAT 
This recommendation follows the completion of a procurement procedure, where the tender
recommended for award has been evaluated as providing the most economically advantageous
tender in terms of cost and quality for the Council.
AGENDA ITEM 13B
Page 185 of 221

Page 186

The Plan for North Lanarkshire 
Priority Improve economic opportunities and outcomes 
Ambition Statement (1) Ensure a housing mix that supports social inclusion and economic
growth 
1. Background 
1.1 The requirements within the Contract are currently under contract. This contract is due to
expire on 26 March 2023 with the Contract detailed within this report due to supersede it. 
1.2  As part of the Councils ongoing “Capital Programme”, there is a requirement for window and
door replacements throughout the Councils housing stock including ‘four in a block’, semi-
detached, low rise and high rise properties etc. 
1.3 The scope of works within the Contract includes but is not limited to the following: 
• Removal of existing finishes, removing doors/composite screens, 
• removing timber or UPVC windows of various sizes;
• removing existing plumbing and electrical installations (where it presents an issue with
new installs, etc.);
• supply and fit of like for like replacement doors and windows of various size, any
mineral wool slab cavity barriers, any associated pointing and mastic works; 
• new kitchen and bathroom ventilation, axial fans to windows, refixing etc; and 
• reinstating any previously removed installations including fans etc. or finishes
including paint and plaster. 
1.4 To enable adequate service provision, the requirements of the Contract have been split
across two (2) lots, with each lot having a set maximum value of work orders the appointed
contractors could be issued. This approach allows the Council to spread the workload across
multiple contractors therefore ensuring delivery of requirements can be met depending on
appointed contractor’s availability and capacity at time of order. 
1.5 Accordingly, tenderers were free to bid for both lots 1 and 2 however, should a tenderer be
recommended for lot 1, their tender for lot 2 (if bidding for both lots) would be excluded on
the basis of the Councils intention to appoint a single / separate contractor to each lot. 
2. Report 
2.1 A user intelligence group (the ‘UIG’) of technical and procurement representatives was
formed to review technical specifications, discuss trading processes, market conditions and
trends, ways to maximise community benefits and sustainability and to agree the
procurement strategy that would deliver maximum benefit for the Council via the Contract. 
2.2 The initial estimated value of the Contract dictated that the procurement procedure be
undertaken in accordance with the Public Contracts (Scotland) Regulations 2015. An advert
for the contract opportunity was published on the Public Contracts Scotland and the UK Find
a Tender (FTS) website. 
Page 186 of 221

Page 187

2.3 The procurement procedure was undertaken as an “Open Procedure” Based on the
evaluation criteria and scoring methodology set out in the invitation to tender package within
the procurement procedure, an evaluation of tender responses was completed by members
identified by the UIG. Selection stage responses were assessed first and compliant tenderers
that satisfied / declared that they met the published minimum selection stage criteria
progressed to the award stage evaluation. Following identification of the recommended
tenderer(s), their selection stage responses were assessed in more detail to ensure they
satisfied the minimum selection stage criteria applied 
2.4 The Contract award recommendation is made on the basis of the two tenderers who
submitted the most economically advantageous tender. 
2.5 The tender(s) as detailed below have been evaluated as representing the most economically
advantageous tenders for this Contract: 
• Lot 1 – Walker Profiles Limited 
• Lot 2 – Belac Group Limited 
2.6 Appendix 1 confirms the scoring achieved by each tenderer, further details of the
procurement procedure is provided in Appendix 2 and the SME status and location of all
tenderers is located within Appendix 3. 
2.7 The maximum value of the Contract shall not exceed Fifteen Million Pounds Sterling
(£15,000,000.00) exclusive of VAT. The value of the Contract is split across both lots with
£10,000,000 applicable to Lot 1, and £5,000,000.00 applicable to Lot 2 
2.8 The costs associated with contract delivery will be contained within the Housing Capital
budget for Housing Property Services. 
Price Savings / Increases 
2.9 The pre-tender whole life estimate for the Contract was £15,000,000.00. This is the maximum
value of the Contract as identified and set by the Council and as a measured term contract
there is no obligation on the Council to spend any or all of this value. 
When comparing rates to with the existing contract tendered in 2019, tendered rates for this
Contract have increased by approximately 40%. These increased costs can be attributed to
a multitude of factors including the Covid pandemic, the ongoing war in Ukraine, increased
construction material costs, and increased labour costs brought about by the sharp rise in
inflation and other cost of living pressures i.e. utility / fuel costs. 
As a result of the increased costs associated with the Contract, there will be a subsequent
reduction in the number of homes to be included within this phase of the Council’s Windows
and Doors Replacement Programme when compared to the previous contract. 
Price Stability 
Page 187 of 221

Page 188

2.10 Contract pricing is fixed until January 2024. Thereafter, prices will be adjusted quarterly by 
the application of the RICS BCIS General Building Cost Price Index which is an industry
standard approach. 
Community Benefits 
2.11.1 The Council is committed to maximising the delivery of community benefits. The procurement
included a community benefit requirement, this approach is designed to deliver local
community benefits where possible. 
2.11.2 Within their tender, the two recommended contractors committed to deliver the following
community benefits within the Contract:  
Lot 1 - Walker Profiles Limited
Community Benefit Type Quantity
Committed
New Job for an Individual from a Priority Group (Full Time)  1
New Job for an Apprentice from a Priority Group (Full Time) 1
Educational Visits 3
Educational Workplace Visit 3
Work Experience Placement for an individual16+ years of age  3
Financial Support for a Community Project / Organisation 2
Non-financial Support for a Community Project / Organisation 2 
Lot 2 - Belac Group Limited
Community Benefit Type Quantity
Committed
New Job for an Individual from a Priority Group (Full Time)  1
New Job for an Individual not from a Priority Group (Full Time)  1
New Job for an Apprentice from a Priority Group (Full Time) 1
Educational Sponsorship 1
Financial Support for a Community Project / Organisation 1 
2.11.3 The community benefits delivered as part of the Contract includes the creation of jobs or
apprenticeships. 
Fair Work First  
2.12 Within their tender submission, the two appointed contractors provided responses to
demonstrate their commitment to the Scottish Governments “Fair Work First” initiative as
detailed below: 
For Lot 1, the Walker Profiles Limited included (but was not limited to) confirmation that their
company’s approach is aligned to ‘Fair Work First’, they have numerous company policies
Page 188 of 221

Page 189

including: - Equal Opportunities, Flexible Working, and Professional Development in place,
and that they are a Real Living Wage Employer 
For Lot 2, the Belac Group Limited included (but was not limited to) confirming that they are
a Real Living Wage Employer, do not utilise zero hour contracts, have regular communication
events with their employees and have programme of training and development available to
their staff. 
Contract Management 
2.13 Officers from Housing Property Services will be responsible for managing the Contract which
will be undertaken in accordance with the Councils agreed approach to contract and supplier
management. 
3. Measures of success 
The Contract will deliver the following outcomes; 
3.1 the appointment of a Service Provider who has the experience and capability to deliver an
innovative, high quality and responsive service; 
3.2 conclusion of a procurement procedure that is compliant with procurement legislation and
internal procedures; 
3.3 confirmation that Best Value is both demonstrable and achieved; and, 
3.4 delivery of a range of Community Benefits. 
4. Supporting documents 
Appendix 1 Summary of Tender Evaluation Process
Appendix 2 Summary of Procurement Process
Appendix 3 SME Status and Location of All Tenderers 
Brian Lafferty
Chief Officer of Housing Property Services  
Page 189 of 221

Page 190

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
This Contract will work towards improving outcomes for people and communities by
assisting the Council to reduce inequalities of outcomes caused by socio-economic
disadvantage. 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☒
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
The value of the Contract is Fifteen Million Pounds Sterling (£15,000,000)
exclusive of VAT including any option to extend the Contract. The costs associated
with contract delivery will be contained within the HRA Capital budget for Housing
Property Services
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☒ No ☐
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☒
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
Page 190 of 221

Page 191

5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
The Contract has the following environmental impacts: encourage sustainable and 
safe environment; promote health and wellbeing; safe removal and disposal of 
materials. 
The proposed contractor was required to be BS EN ISO 14001 (or equivalent) and
BS EN ISO 9001 (or equivalent) accredited and has provided appropriate evidence
of accreditation.
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g., Corporate or
Service or Project Risk Registers), and how they are managed?
Risk will be minimised and managed by a designated Contract manager in
accordance with the specification and in line with the Council’s agreed approach to
Contract and Supplier Management. 
The proposed contractors are required to be UKAS (BS EN ISO 45001) accredited
and provided appropriate evidence of their accreditation. 
5.10  Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes  ☐  No   ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 191 of 221

Page 192

Appendix 1 – Summary of Tender Evaluation Process 
Lot 1
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Contract
Award (Y / N)
1 Walker Profiles Limited 92.34% Yes
2 Belac Group Limited 92.14% No
3 Sidey Solutions Limited 90.84% No
4 CR Smith Manufacturing Limited 86.17% No 
Lot 2
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Contract
Award (Y / N)
1 Bell Decorating Group Limited 94.16% No 1
2 Belac Group Limited 92.80% Yes
3 Sidey Solutions Limited 89.89% No
4 CR Smith Manufacturing Limited 86.68% No
5 Sovereign Group Limited 78.56% No 
1 Following their identification as submitting the most economically advantageous tender for Lot 2, the Council requested
evidence from Bell Decorating Group Limited to corroborate initial responses to the SPD (Scotland) to demonstrate that
they met the Council’s minimum requirements in terms of eligibility, business probity, financial standing, experience etc.
During this process, the evaluation panel jointly agreed that Bell Decorating Group Limited failed part of this assessment
therefore they could not be recommended for award of Lot 2. Thereafter, the same process to obtain evidence to
corroborate SPD (Scotland) responses was undertaken with the next ranked tenderer to determine if they met the
Council’s minimum requirements which the evaluation panel jointly agreed that they did.
Page 192 of 221

Page 193

Appendix 2 – Summary of Procurement Process 
Response
CPT Contract Reference Allocated: NLC-CPT-21-163
Tender Platform Utilised: PCS-Tender (PCST)
Procurement Procedure Utilised: Open Procedure
Governing Legislation / Regulations: Public Contracts (Scotland) Regulations 2015
Date Contract Strategy Approved: 10 October 2022
Date Contract Notice Published: 20 October 2022
Total Expressions of Interest Received: 17
SME % of Expressions of Interest: 52%
NLC Based % of Expressions of Interest: 47%
Tender Return Deadline: 12 Noon, 21 November 2022
Number of Tenders Received: Eight (8) Total: Lot 1 – Six (6) / Lot 2 – Eight (8) 2
Tenders Received from SME’s: Six (6)
Tenders Received from NLC Based Tenderers:  Five (5) 3
Number of Non−compliant Tenders: Two (2)
Number of Compliant Tenders: Six (6) Total: Lot 1 – Four (4) / Lot 2 – Six (6)
Number of Recommended Tenderers: Two (2)
Basis of Contract Award: Quality: 40% Price: 60%
Evaluation Team: Officer from Housing and Projects
Anticipated Contract Start Date: 03 April 2023
Total Contract Period (Months): 9 + 12 (in 4 x 3 month increments)
Maximum Total Contract Value: £15,000,000.00 
2 Tenderers were free to bid for a single or both lots. All tenderers bid for lot 2 however six only bid lot 1. 
3 Although not having their registered address in North Lanarkshire, some tenderers advised that they operate from
premises within North Lanarkshire Page 193 of 221

Page 194

Appendix 3 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
Belac Group Limited Medium North Lanarkshire
Bell Decorating Group Limited Large North Lanarkshire
CCG (Scotland) Limited Large South Lanarkshire
CR Smith Manufacturing Limited Medium Fife
Procast Building Contractors Limited Medium South Lanarkshire
Sidey Solutions Limited Medium Perth and Kinross
Sovereign Group Limited Medium Lancashire
Walker Profiles Limited Medium North Lanarkshire 
Page 194 of 221

Page 195

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref: HO EE 22 078 Date: 15 February 2023 
Contract Award for MTC Battery Storage and PV Panels (2023-2026) 
From Chief Officer, Housing Property Services  
E-mail Starbucks@northlan.gov.uk Telephone
Siobhan Starbuck
Contract Support Manager
07583 062739 
Executive Summary 
Committee is asked to approve the award of a MTC contract for Battery Storage and PV Panels
(2023-2026) (the ‘Contract’) to Saltire Facilities Management Ltd. 
The Contract is for an initial period of 10 months anticipated to commence in April 2023. The Council
reserves the right to extend the Contract for additional periods up to a maximum of a further 24
months. (8 x 3 months optional extension periods). 
The value of the Contract shall not exceed Nine Million Pounds Sterling (£9,000,000) exclusive of
VAT. 
Recommendations 
It is recommended that Committee approves the award of the Contract to Saltire Facilities
Management Ltd. at the maximum value of Nine Million Pounds Sterling (£9,000,000) exclusive of
VAT 
This recommendation follows the completion of a procurement procedure, where the tender
recommended for award has been evaluated as providing the most economically advantageous
tender in terms of cost and quality for the Council. 
The Plan for North Lanarkshire 
Priority Improve North Lanarkshire's resource base 
Ambition Statement (1) Ensure a housing mix that supports social inclusion and economic
growth 
AGENDA ITEM 13C
Page 195 of 221

Page 196

1. Background 
1.1 The contract contains some new requirements, however some aspects are delivered within
an existing contract with Saltire Facilities Management Ltd. This contract is due to expire on
12 August 2024. This contract is in addition to the contract currently in place. 
1.2  This procurement was carried out as a single lot. 
1.3. This procurement is an above GPA threshold regulated procurement and has been  
discharged as a single-stage procurement process.   
2. Report 
2.1 A user intelligence group (the ‘UIG’) of technical and procurement representatives was
formed to review technical specifications, discuss trading processes, market conditions and
trends, ways to maximise community benefits and sustainability and to agree the
procurement strategy that would deliver maximum benefit for the Council via the Contract. 
2.2 The initial estimated value of the Contract dictated that the procurement procedure be
undertaken in accordance with the Public Contracts (Scotland) Regulations 2015. An advert
for the contract opportunity was published on the Public Contracts Scotland and the UK Find
a Tender (FTS) website. 
2.3 The procurement procedure was undertaken as an “Open Procedure” Based on the
evaluation criteria and scoring methodology set out in the invitation to tender package within
the procurement procedure, an evaluation of tender responses was completed by members
identified by the UIG. Selection stage responses were assessed first and compliant tenderers
that satisfied / declared that they met the published minimum selection stage criteria
progressed to the award stage evaluation. Following identification of the recommended
tenderer, their selection stage responses were assessed in more detail to ensure they
satisfied the minimum selection stage criteria applied 
2.4 The Contract award recommendation is made on the basis of the tenderer who submitted the
most economically advantageous tender. 
2.5 The tender submitted by Saltire Facilities Management Ltd has been evaluated as
representing the most economically advantageous tender for this Contract. 
2.6 Appendix 1 confirms the scoring achieved by each tenderer, further details of the
procurement procedure is provided in Appendix 2 and the SME status and location of all
tenderers is located within Appendix 3. 
2.7 The value of the Contract is Nine Million Pounds Sterling (£9,000,000) exclusive of VAT
including any option to extend the Contract. 
2.8 The costs associated with contract delivery will be contained within the HRA Capital budget
set for each financial year. 
Price Savings / Increases 
Page 196 of 221

Page 197

2.9 Contract pricing is fixed until January 2024. Thereafter, prices will be adjusted annually by
the application of the RICS BCIS General Building Cost Price Index. 
Price Stability 
2.10 Schedule of Rates with prices for adjustment by overall percentage and annual RICS BCIS
fluctuation percentage 
Community Benefits 
2.11.1 The Council is committed to maximising the delivery of community benefits. The procurement
included a community benefit requirement, this approach is designed to deliver local
community benefits where possible. 
2.11.2 Within their tender, Saltire Facilities Management Ltd committed to deliver the following
community benefits within the Contract:  
Community Benefit Type Quantity
Committed
New Entrants – Key Priority Group 1
New Start - Apprentice 1
Work Experience Placement – 16+ years of age 2
Work Experience Placement – 14-16 years of age 2
Careers Event 3
Site Visits 3
School Mentoring or Enterprise Programme 3
Financial Support for a Community Project 1
Non-Financial Support for a Community Project 2 
2.11.3 The community benefits delivered as part of the Contract includes the creation of jobs or
apprenticeships. 
Fair Work First  
2.12 Within their tender submission, Saltire Facilities Management Ltd advised that they commit
to the following areas of the Scottish Governments “Fair Work First” initiative: 
• Living Wage Foundation Accredited member  
• No zero hours contracts 
• Flexible working and supportive of a wider work life balance 
• Promote diversity, equality, and fair employment practices 
• Support for learning and development, are supportive of further education opportunities for
employees 
• Gender balance and wider representative workforce  
Page 197 of 221

Page 198

Contract Strategy 
2.13 Officers from Housing Property and Projects will be responsible for managing the Contract
which will be undertaken in accordance with the Councils agreed approach to contract and
supplier management. 
3. Measures of success 
The Contract will deliver the following outcomes; 
3.1 the appointment of a Service Provider who has the experience and capability to deliver an
innovative, high quality and responsive service; 
3.2 conclusion of a procurement procedure that is compliant with procurement legislation and
internal procedures; 
3.3 confirmation that Best Value is both demonstrable and achieved; and, 
3.4 delivery of a range of Community Benefits. 
4. Supporting documents 
Appendix 1 Summary of Tender Evaluation Process
Appendix 2 Summary of Procurement Process
Appendix 3 SME Status and Location of All Tenderers 
Brian Lafferty
Chief Officer, Housing Property Services 
Page 198 of 221

Page 199

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
This Contract will work towards improving outcomes for people and communities by
assisting the Council to reduce inequalities of outcomes caused by socio-economic
disadvantage. 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☒
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
The value of the Contract is Nine Million Pounds Sterling (£9,000,000) exclusive of
VAT including any option to extend the Contract. The costs associated with contract
delivery will be contained within the HRA Capital budget for Housing Property and
Projects. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☒ No ☐
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☒
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
Page 199 of 221

Page 200

5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact?
The Contract has the following environmental impacts: encourage sustainable and 
safe environment; promote health and wellbeing; safe removal and disposal of 
materials.
The proposed contractor was required to be BS EN ISO 14001 (or equivalent) and
BS EN ISO 9001 (or equivalent) accredited and has provided appropriate evidence
of accreditation
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g., Corporate or
Service or Project Risk Registers), and how they are managed?
Risk will be minimised and managed by a designated Contract manager in
accordance with the specification and in line with the Council’s agreed approach to
Contract and Supplier Management. 
The proposed contractor was required to be UKAS (BS EN ISO 45001) accredited
and provided appropriate evidence of their accreditation. 
5.10  Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes  ☐  No   ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 200 of 221

Page 201

Appendix 1 – Summary of Tender Evaluation Process
In the Award Stage, tenderers’ price scores were added to their quality scores to obtain their 
final tender scores. Only the first ranking tenderer from Award Stage underwent Selection 
Stage evaluation. Details are contained in the tables below. 
Table 1: Stage 1 – Award Stage Evaluation
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Contract
Award (Y / N)
1 Saltire Facilities Management Ltd 96.75 Y
2 BRB Electrical Ltd 91.11 N
3 Emtec Group 90.76 N
4 Everwarm Ltd 89.59 N
5 Procast Building Contractors Ltd Disqualified 
Table 2: Stage 2 – Selection Stage Evaluation Outcome 
Tenderer
Name
Part 3
A, B, C &
D
Part 4
A & B
Part 4
C
Part 4
D Selection
Requirements
Met?
(Yes/No)
Selection
Criteria
Selection
Criteria
Selection
Criteria
Selection
Criteria
Pass/Fail Pass/Fail Score
(min = 50) Pass/Fail
Saltire
Facilities
Management
Ltd
Pass Pass 71.11 Pass Yes 
Page 201 of 221

Page 202

Appendix 2 – Summary of Procurement Process 
Response
CPT Contract Reference Allocated: NLC-NLP-22-063
Tender Platform Utilised: PCS Mailbox (PCS)
Procurement Procedure Utilised: Open Procedure
Governing Legislation / Regulations: Public Contracts (Scotland) Regulations 2015
Date Contract Strategy Approved: Insert Date
Date Contract Notice Published: 20 October 2022
Tender Return Deadline: 21 November 2022
Number of Tenders Received: 5
Tenders Received from SME’s: 4
Tenders Received from NLC Based Tenderers:  2
Number of Non−compliant Tenders: 1
Number of Compliant Tenders: 4
Number of Recommended Tenderers: 1
Basis of Contract Award: Quality: 40% Price: 60%
Evaluation Team: Staff from Housing Property and Projects
Anticipated Contract Start Date: 03 April 2023
Total Contract Period (Months): 10 months plus optional 24 months
Maximum Total Contract Value: £9,000,000 
Page 202 of 221

Page 203

Appendix 3 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
Saltire Facilities Management Ltd Medium North Lanarkshire
Council
BRB Electrical Ltd Small Glasgow City
Council
Emtec Group Medium North Lanarkshire
Council
Everwarm Ltd Large West Lothian
Council
Procast Building Contractors Ltd Medium South Lanarkshire
Council 
Page 203 of 221

Page 204

Page 204 of 221

Page 205

North Lanarkshire Council
Report
Housing Services Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref:  Date: 15 February 2023 
Contract Award for Garden Assistance Scheme 2023 – 2025 (Lot 1 –
Mini-Competition) 
From  Stephen Llewellyn, Chief Officer, Housing Management  
E-mail Llewellyns@northlan.gov.uk Telephone: 01698 274192 /
07939280680 
Executive Summary 
Committee is asked to homologate the award of a Call-Off contract for Garden Assistance Scheme
(Lot 1) 2023 – 2025 (the ‘Contract’) to Id Verde Ltd. 
The Call-Off Contract is for a period of 24 months anticipated to commence on 06 March 2023. 
The value of the Call-Off Contract shall not exceed One Million Two Hundred Thousand Pounds
Sterling (£1,200,000) exclusive of VAT. 
Recommendations 
It is recommended that Committee homologates the award of the Call-Off Contract to Id Verde Ltd
at the maximum value of One Million Two Hundred Thousand Pounds Sterling (£1,200,000)
exclusive of VAT. 
This recommendation follows the completion of a procurement procedure, where the tender
recommended for award has been evaluated as providing the most economically advantageous
tender in terms of cost and quality for the Council. 
The Plan for North Lanarkshire 
Priority Improve the health and wellbeing of our communities 
Ambition Statement (17) Ensure we keep our environment clean, safe, and attractive 
1. Background 
1.1 The requirements within the Call-off Contract are currently under contract with Tivoli Group
Ltd. This contract is due to expire on 5 March 2023 with the Call-off Contract detailed within
this report due to supersede it.
AGENDA ITEM 14
Page 205 of 221

Page 206

1.2  The Housing Service currently provides a Garden Assistance Scheme for elderly and infirm
tenants/residents of North Lanarkshire. The service is provided free of charge for Council
tenants and on a chargeable basis for Owner Occupiers and tenants of other Registered
Social Landlords or Private Landlords. 
1.3 Through this Call-Off Contract service users receive 9 grass cuts, 3 hedge cuts, 2 weedkills
and 2 occurrences of edging throughout the growing season between approximately March
and October each year. 
1.4 The Garden Assistance Scheme is currently serviced in 2 Lots, with each Lot covering a
different geographical area of North Lanarkshire. Lot 1 serves the North Areas of North
Lanarkshire including Coatbridge, Airdrie, Cumbernauld, Kilsyth, Moodiesburn, Bargeddie
and surrounding areas, and Lot 2 serves the South areas including Bellshill, Motherwell,
Wishaw, Shotts and surrounding areas. 
1.5 In 2020 the service procured a Framework Agreement specifically for services required to
provide the Garden Assistance Scheme for tenants and residents for the period 2021 – 2024,
with the option to extend the contract for a further year until 2025. 
1.6 There are currently three companies on the Framework Agreement for Lot 1 of the Garden
Assistance Scheme, each of these companies are able to service the requirements of the
contract however due to the financial impact of the Covid pandemic and the ongoing
increases in the cost of living and fuel charges each of the companies have expressed and
inability to provide the services for Lot 1 at the originally agreed price in the Framework
Agreement. 
1.7 It was agreed, to allow us to continue to provide a garden service for the remaining term of
the contract that we would carry out a mini-competition between the contractors on the
framework, whereby we would carry forward the quality scores from the original tender
exercise and allow the contractors to resubmit the pricing schedule allowing us to award the
remaining term of the contract to the company providing the most economically
advantageous service. 
1.8 While there is only one year of the original contract left to be serviced, the original Framework
Agreement did have the option to extend for one year. It was agreed it would be less
favourable for contractors to incur the costs of obtaining the additional machinery etc required
to service this Call-Off Contract for one year and that we would be likely obtain more
favourable responses by taking in the original extension year that was available through the
Framework Agreement and offering this as a two-year Call-Off Contract for the period 2023
-2025. 
2. Report 
2.1 A user intelligence group (the ‘UIG’) of technical and procurement representatives was
formed to review technical specifications, discuss trading processes, market conditions and
trends, ways to maximise community benefits and sustainability and to agree the
procurement strategy that would deliver maximum benefit for the Council via the Call-Off
Contract. 
2.2 The initial estimated value of the Call-Off Contract dictated that the procurement procedure
be undertaken in accordance with the Public Contracts (Scotland) Regulations 2015. 
Page 206 of 221

Page 207

2.3 The procurement procedure was undertaken as a “Mini Competition” from the Council’s own
framework agreement for the Garden Assistance Scheme and Ad-Hoc Garden Works 2021
– 2024, Lot 1 (North) Garden Assistance Scheme.   
2.4 The Contract award recommendation is made on the basis of the tenderer who submitted the
most economically advantageous tender. 
2.5 The tender(s) submitted by Id Verde Ltd has been evaluated as representing the most
economically advantageous tender for this Contract. 
2.6 Appendix 1 confirms the scoring achieved by each tenderer, further details of the
procurement procedure is provided in Appendix 2 and the SME status and location of all
tenderers is located within Appendix 3. 
2.7 The value of the Contract is One Million Forty-Two Thousand One Hundred and Seven
Pounds Sterling (£1,042,107) exclusive of VAT. 
2.8 The costs associated with contract delivery will be contained within the Revenue and Capital
budget for Housing Services. 
Price Savings / Increases 
2.9 The pre-tender wholelife estimate for the Call-Off Contract was £1,200,000. 
The pre-tender estimate was based on the current number of service users utilising the
service against the current spend, taking account of current trends in price increases /
inflation etc. 
The provision of this service is demand led and therefore the actual spend may vary
marginally from the contract value. 
Price Stability 
2.10 The price for the services provided is fixed for the 24-month term of the Call-Off Contract. 
Community Benefits 
2.11.1 The Council is committed to maximising the delivery of community benefits. The procurement
included a community benefit requirement, this approach is designed to deliver local
community benefits where possible. 
2.11.2 Within their tender, Id Verde Ltd. committed to deliver the following community benefits within
the Contract:  
Community Benefit Type Quantity
Committed
New Job for an Apprentice from a Priority Group 2
Page 207 of 221

Page 208

Educational Support & Skills transfer 1
Non-financial Support for a Community Project / Organisation 2
Educational Visits 2 
2.11.3 The community benefits delivered as part of the Call-Off Contract includes the creation of
jobs or apprenticeships. 
Fair Work First  
2.12 Within their tender submission, Id Verde Ltd advised that they will commit to the following
areas of the Scottish Governments “Fair Work First” initiative: 
• They are committed to having all employees paid the Living Wage or higher;
• They do not use zero hour contracts;
• They are an Equal Opportunities Employer who actively aim to address the gender balance;
• They offer flexible working where possible to accommodate work life balance;
• They offer a Pension Scheme; Childcare vouchers; Occupational Health Surveillance and an
Employee Assistance Programme. 
Contract Management 
2.13 Officers from Housing Solutions will be responsible for managing the Contract which will be
undertaken in accordance with the Councils agreed approach to contract and supplier
management. 
3. Measures of success 
The Call-Off Contract will deliver the following outcomes; 
3.1 This Call-Off Contract will provide a Garden Assistance Scheme to elderly and infirm tenants
and residents living in the Northern areas of North Lanarkshire (Coatbridge, Airdrie,
Cumbernauld. Moodiesburn, Bargeddie and surrounding areas). It will provide service users
with 9 grass cuts with edging on 2 of these visits, 3 hedge cuts and 2 weedkills throughout
the growing season between approximately March and October each year. 
4. Supporting documents 
Appendix 1 Summary of Tender Evaluation Process
Appendix 2 Summary of Procurement Process
Appendix 3 SME Status and Location of All Tenderers 
Stephen Llewellyn
Chief Officer of Housing Management
Page 208 of 221

Page 209

5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Garden Assistance Scheme has a positive impact on residents with the
protected characteristics of age and disability as it provides a service for elderly and
disabled tenants/ residents of North Lanarkshire to assist them with the maintenance
and upkeep of the garden area at their property. This may assist in enabling elderly
/ disabled tenants and residents to live independently within the community. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒
Page 209 of 221

Page 210

If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The contractor appointed to this contract will recycle all garden waste arising from
the grass cuts appropriately within the tenants / resident’s garden waste bins,
contributing to the council and national targets for the recycling of garden waste.
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 210 of 221

Page 211

Appendix 1 – Summary of Tender Evaluation Process 
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Contract
Award (Y / N)
1 Id Verde Ltd 94.80% Y
2 Glendale Grounds Management Ltd 92.70% N
3 Tivoli Group Ltd 84.57% N 
Page 211 of 221

Page 212

Appendix 2 – Summary of Procurement Process 
Response
CPT Contract Reference Allocated: NLC-CPT-22-141
Tender Platform Utilised: PCS-Tender (PCST)
Procurement Procedure Utilised: Mini Competition
Governing Legislation / Regulations: Public Contracts (Scotland) Regulations 2015
Date Contract Strategy Approved: 13 December 2022
Date Contract Notice Published: 13 December 2022
Number of Companies Invited to Take Part: Three
SME % of Expressions of Interest: 67%
NLC Based % of Expressions of Interest: 0%
Tender Return Deadline: 21 December 2022
Number of Tenders Received: Three
Tenders Received from SME’s: Two
Tenders Received from NLC Based Tenderers:  None
Number of Non−compliant Tenders: None
Number of Compliant Tenders: Three
Number of Recommended Tenderers: One
Basis of Contract Award: Quality: 30% Price: 70%
Evaluation Team:
Karen McGettigan, Housing Operations Manager,
Price Evaluator;
Tracey Paterson, Senior Clerical Assistant, Price
Evaluator;
Jennifer Lauder, Senior Clerical Assistant, Price
Evaluator
Anticipated Contract Start Date: 06 March 2023
Total Contract Period (Months): 24 Months
Maximum Total Contract Value: £1,200,000 
Page 212 of 221

Page 213

Appendix 3 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
Id Verde Ltd Large Warwickshire
Glendale Grounds Management Ltd Medium Lancashire
Tivoli Group Ltd Medium Cheshire 
Page 213 of 221

Page 214

Page 214 of 221

Page 215

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref CG/JMcK Date 15/02/23 
Contracts awarded below Committee approval threshold 
From  Chief Officer of Assets and Procurement  
Email mckinstryj@northlan.gov.uk  Telephone James McKinstry
07939 281102 
1. Background 
Executive Summary
This report notifies the Committee of the contracts awarded between 1 October 2022 to 31
December 2022. It sets out those contracts awarded with a value below the financial
threshold requiring Committee approval. 
Recommendations
The Housing Committee are: 
• advised of the Contracts awarded below Committee approval threshold between 1
October 2022 to 31 December 2022 as per the process within the Council’s General
Contract Standing Orders.   
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (17) Ensure we keep our environment clean, safe, and attractive
1.1 The Councils General Contract Standing Orders (the ‘GCSOs’) outline financial
approval thresholds for contracts for goods, works and services. Contract awards
above £500,000 for Supplies and Services and above £2,000,000 for Works require
approval by the Committee. These contract awards are considered by the Committee
on a case-by-case basis. 
1.2 Where the value of a contract award is between £50,000 and £500,000 for Supplies
and Services and between £500,000 and £2,000,000 for Works, GCSOs require that
the Head of Asset and Procurement Solutions award these contracts on behalf of the
appropriate Chief Officer. 
1.3 The Head of Asset and Procurement Solutions is required to notify Committee on a
regular basis of any such contracts awarded on behalf of Procuring Service Areas.
AGENDA ITEM 15
Page 215 of 221

Page 216

2. Report 
3. Measures of success 
4. Supporting documentation 
4.1 Appendix 1 - Summary of contracts awarded. 
James McKinstry
Chief Officer of Assets and Procurement 
2.1 The GCSOs require that contracts in excess of £500,000 for supplies and services and
£2,000,000 for works are approved, on a case-by-case basis, by the Committee before
award. 
2.2 The GCSOs require that contracts with a value above £50,000 but less than £500,000
for Supplies and Services and above £500,000 but less than £2,000,000 for Works are
awarded by the Head of Asset and Procurement Solutions on behalf of the appropriate
Chief Officer. 
2.3 The contracts awarded by the Head of Asset and Procurement Solutions that are under
the £500,000 Committee financial approval threshold for Supplies and Services and
£2,000,000 for Works in the period from 1 October 2022 to 31 December 2022 are
detailed in Appendix 1.
3.1 Contracts support the delivery of Council and service priorities. 
3.2 Appointment of contractors who have suitable experience and capability to deliver the
required supplies, services or works. 
3.3 Contracts awarded by the Council are compliant with GCSOs and procurement
legislation. 
3.4 The Council’s Contract Register is kept updated by services and management
information is comprehensive and accurate. 
3.5 Best Value is both demonstrable and achieved.
Page 216 of 221

Page 217

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☒
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Where Financial impacts have been identified, they have been established and 
addressed in each specific Contract Strategy and incorporated into the project.   
The Council’s Procurement Strategy proposes methods of maximising the delivery 
of procurement benefits that could bring improved financial return to the Council 
and the areas wider economy. Certain benefits have a monetary value attached 
and these will be monitored on a project-by-project basis.
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☒ No ☐
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Where HR impacts have been identified, they have been established and 
addressed in each specific Contract Strategy and incorporated into the project.   
Contracts awarded by the Council are compliant with GCSOs and procurement
legislation.
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☒ No ☐
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Where Legal impacts have been identified, they have been established and 
addressed in each specific Contract Strategy and incorporated into the project. 
Page 217 of 221

Page 218

Contracts awarded by the Council are compliant with GCSOs and procurement
legislation. 
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☒
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
Sustainable procurement is one of the key objectives of the Strategy and will have
a positive impact, including, embedding sustainable procurement as business as
usual and incorporating community benefits into the Councils contracts. Supporting
local businesses and SMEs through closer working with colleagues in the Council’s
Enterprise department and by making our processes more streamlined and
accessible. 
Where Environmental/Carbon impacts have been identified, they have been 
established and addressed in each specific Contract Strategy and incorporated into 
the project.  
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Where Risk impacts have been identified, they have been established and 
addressed in each specific Contract Strategy and incorporated into the project. 
Page 218 of 221

Page 219

Contract award procedures may be susceptible to legal challenge if they are not
discharged in accordance with GCSO and procurement legislation. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services 
Page 219 of 221

Page 220

APPENDIX 1 – SUMMARY OF BELOW THRESHOLD CONTRACT AWARDS
Contract Description Contract
Award
Date
Contract
Start   
Date
Contract
End Date
Contract
Extension
Contract
Value (incl
extension)
(£s)
Successful Tenderer  Supplies
Services
Works
No of
Tenders
Received 
Route*
Confirm Asset Management
Repository Solution 2022-23
12/10/2022 23/11/2022 22/11/2023 N/A £56,264.67 Brightly Software Ltd Services 1 *EXT
Enterprise Project: Technical Support 23/11/2022 01/11/2022 21/01/2023 N/A £100,000.00 Faithful & Gould Ltd Services 1 **DAF3
Stairwell Cleaning Services (Close
Cleaning) 2020-23
15/12/2022 13/01/2023 12/01/2024 N/A £403,097.60 C.A.S. Contract Cleaning
Ltd
Services 1  *EXT
MTC: Electric Heating Replacement
2022-26
19/12/2022 09/01/2023 20/01/2024 N/A £1,999,999.00 Valley Group Ltd Works 7 CO 
*Contract extensions to incumbent providers delivering best value.  Provision for extension made in original contract award reported to previous
Committees. 
** Direct Award from 3rd party framework (City of Edinburgh) to best value provider.
Key – Procurement Route
CO -   Contract Open Procedure
CR -   Contract Restricted Procedure
FO -   Framework Open Procedure
FR -   Framework Restricted Procedure
FMCC - Mini Comp Council Framework
FMC3 - Mini Comp 3rd Party Framework
DAFC - Direct Award Council Framework
Page 220 of 221

Page 221

DAF3 -  Direct Award 3rd Party Framework
DAH&SC - Direct Award Health & Social Care Related Services
N -   Negotiated Contract
EXT -  Extension to Contract/Framework 
Page 221 of 221