North Lanarkshire Council
Report
Finance & Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    IM/JMcK Date 13/09/23 
Substation Lease for NLC Bellshill Transport Depot, Old
Edinburgh Road, Bellshill 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail MartinI@northlan.gov.uk  Telephone  Ian Martin
07966 397637 
Executive Summary
The purpose of this report is to seek Committee approval to grant a lease to SP Distribution
PLC for a new substation, associated equipment, and servitudes for rights of access on
land within the NLC Bellshill Transport Depot, Old Edinburgh Road, Bellshill. 
Recommendations 
It is recommended that the Finance and Resources Committee: 
(1) Agree to grant a new lease to SP Distribution PLC or their nominees for a substation
and associated servitude for cables, pedestrian and vehicular rights of access on land
at Old Edinburgh Road, Bellshill on the terms detailed within this report; and 
(2) All other terms and conditions to be adjusted by the Chief Officer (Assets and
Procurement)  
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (3) Maximise the use of our marketable land and assets through
improved development in business and industrial infrastructure

Page 2

1. Background 
1.1 Planning permission was granted in November 2021 for the construction of a two-storey
building comprising main vehicular workshop for vehicular servicing, offices, and
welfare facilities for staff. 
1.2 In accordance with the Council’s objectives and vision to ensure best value for service
delivery, depot rationalisation was identified. Two main areas of service delivery will be
accommodated within the new building, which is to be in the existing Transport Services
Depot, Old Edinburgh Road, Bellshill. 
1.3 The current Fleet Depot building has been deemed unsafe and following a costing
exercise it was uneconomical to repair/refurbish the existing properties. 
1.4 The design and construction of a new vehicle workshop consisting of a maintenance
repair area, MOT facilities, VOSA lane, stores, office, welfare, and toilet facilities will
provide a new transport hub which is in keeping with the Council’s objectives and vision. 
1.5 An electrical substation is required to provide a sustainable electrical supply to the new
building. 
2. Report 
2.1 The substation is to be sited within an area of ground within the boundary of the
transport depot as shown shaded pink on the attached plan at appendix 1. 
2.1.1 Proposed area to be leased extends to 25 square metres (269 sq. ft.) or thereby. 
2.1.2 A servitude right of access for cables, pedestrian and vehicular access to the substation
as shown hatched on the attached plan at appendix 1. 
2.2 Lease Proposal 
A provisional agreement has been reached with SP Distribution PLC on the following
terms and conditions: 
2.2.1 Rent:   £1 per annum (if asked) 
2.2.2 Term:     175 years 
2.2.3 Date of Entry:  Upon conclusion if missives or as agreed between the parties 
2.2.4 Legal Fees:  Both parties shall bear their own legal fees relating to this    
transaction 
3. Measures of success 
3.1  This transaction will enable SP Distribution PLC to erect a new substation to provide a
sustainable electrical supply to the new building for the Bellshill Transport Depot.

Page 3

4. Supporting documentation 
Appendix 1 – Location Plan 
James McKinstry
Chief Officer (Assets and Procurement)

Page 4

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
The council will be entering into a formal lease agreement with SP Distribution
PLC. Instructions will be issued to Legal Services as part of this transaction. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?

Page 5

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐

Page 6