Democracy Spraffa

Lease of Land at Allan Street Draffen Street Motherwell

North Lanarkshire Council · 13 September 2023
Back to Finance and Resources Committee — 13 September 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    IM/JMcK Date 13/09/23 
Lease of Land at Allan Street/Draffen Street, Motherwell 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail MartinI@northlan.gov.uk  Telephone  Ian Martin
07966 397637 
Executive Summary
The purpose of this report is to advise Committee of the action taken by the Depute Chief
Executive following consultation with the Convener of the Finance and Resources
Committee to approve a 175-year lease agreement between NLC and SP Distribution PLC
for a new substation, associated equipment and servitudes for rights of access on land at
Allan Street and Draffen Street, Motherwell. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledges the grant of a new lease to SP Distribution PLC or their nominees for
a substation and associated servitude for cables, pedestrian and vehicular rights of
access on land at Allan Street and Draffen Street, Motherwell on the terms detailed
within this report; and 
(2) All other terms and conditions to be adjusted by the Chief Officer (Assets and
Procurement) 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (3) Maximise the use of our marketable land and assets through
improved development in business and industrial infrastructure

Page 2

1. Background 
1.1 On 29th April 2022 a contract was awarded by NLC for the demolition of three high-rise
tower blocks Coursington, Allan and Draffen in Motherwell.  During the demolition
process which included service isolation, an issue was identified in progressing the
service disconnection works required for the demolition to take place.  Within each of
the three towers, there is a sub-station to service the tower, which can be the case from
time to time.   
1.2 Although there was an awareness of the sub-stations being in situ, the service drawings
obtained did not reflect that the sub-stations were also connected into the local grid to
provide additional capacity for the network infrastructure in the area. 
1.3 This information only came to light when the demolition contractor commenced the
disconnection process and started to engage with Scottish Power Energy Networks
(SPEN). 
1.4 The additional time to undertake these service redirection works resulted in the need
to instruct the demolition contractor to provide a protective structure over the sub-
station at Coursington Tower to allow the demolition works to progress. 
1.5 A full design and agreement is in place with SPEN for the provision of a new substation
on a site owned by NLC out with the confines of the building that will take over the
loading from the existing towers and allow the demolition works to progress. 
1.6 The Housing Property Services team, to reduce further delay, has requested that the
electrical substation lease be agreed outside the committee cycle to enable the
redirections to be complete and allow the demolition to conclude. 
2. Report 
2.1 The substation is to be sited within an area of ground at Allan Street, Motherwell, as
shown on the plan attached at Appendix 1. 
2.1.1 Proposed area to be leased extends to 25 square metres (269 sq. ft.) or thereby. 
2.1.2 A servitude right of access for cables, pedestrian and vehicular access to the substation
will be taken from Allan Street. 
2.2 Lease Proposal 
A provisional agreement has been reached with SP Distribution PLC on the following
terms and conditions: 
2.2.1 Rent:  £1 per annum (if asked) 
2.2.2 Term:    175 years 
2.2.3 Date of Entry: Upon conclusion of missives or as agreed between the parties.

Page 3

3. Measures of success 
3.1  Formalisation of the 175 year substation lease between NLC and SP Distribution PLC
to complete the planned demolition of the three tower blocks.   
4. Supporting documentation 
Appendix 1 – Location Plan 
James McKinstry
Chief Officer (Assets and Procurement)

Page 4

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
The council will be entering in to a formal lease agreement with SP Distribution
PLC. Instructions will be issued to Legal Services as part of this transaction. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact

Page 5

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐

Page 6

Appendix 1