North Lanarkshire Council Report Finance and Resources Committee Does this report require to be approved? ☐ Yes ☒ No Ref EK/KS/RM/GM Date 24/05/23 Treasury Management Monitoring Report for quarter ended 31 March 2023 From Elaine Kemp, Chief Officer (Finance) E-mail mcnameer@northlan.gov.uk Telephone Ryan McNamee, Finance Manager 1. Background 1.1 The Council manages its treasury activities in line with the CIPFA Code ‘‘Treasury Management in the Public Services’. The Code requires the Council to produce reports on its Treasury Management policies, practices and activities on a regular and ongoing basis. The Council fulfils these obligations, in part, by the preparation of this Treasury Management Monitoring report produced on a quarterly basis, encompassing a review of performance. 1.2 The Treasury activity undertaken in the final quarter of 2022/23 reflects the key requirements of the Council’s 2022/23 Treasury Management Strategy, with the Public Works Loan Board (PWLB) and Long-term Money Market being the prime source of long- term funds. In terms of investment activity, this is conducted in accordance with the approved 2022/23 investment strategy. Executive Summary This report fulfils the key requirements of the Council’s reporting procedures for Treasury Management in accordance with the CIPFA Code of Practice on Treasury Management and the CIPFA Prudential Code for Capital Finance in Local Authorities. It informs on the quarterly Treasury Management activity for the period 1 January 2023 to 31 March 2023 and compliance with the mandatory treasury and prudential indicators. Recommendations It is recommended that Committee note the Treasury Management Activity for the quarter ended 31 March 2023 including the positive performance against the key treasury and prudential indicators. The Plan for North Lanarkshire Priority Improve North Lanarkshire's resource base Ambition statement (25) Ensure intelligent use of data and information to support fully evidence based decision making and future planning
Page 2
2. Report 2.1 Summary Position 2.1.1 The net overall borrowing position to 31 March 2023 is £838.2m, which is an increase of £40.6m from the position at the 31 December 2022. A detailed breakdown of the net cash movement is shown in column (6) within Appendix 1. 2.2 Borrowing 2.2.1 At the end of the quarter, total external debt amounted to £915.9m which represented an increase of £63.5m. This was primarily due to additional net longer term borrowing of £37.1m being undertaken, comprising new PWLB borrowing of £60.0m partially offset by £12.9m of PWLB debt and £10.0m of market loans falling due for repayment. 2.2.2 The Council sourced £20.0m of PWLB loans on 21st February 2023 at 4.25% over 15 years, £20.0m sourced on 17th March 2023 at 4.40% over 14 years and a further £20.0m sourced on 28th March 2023 at 4.03% over 13 years, all on an equal instalment payment (EIP) basis. The EIP terms provide a smoother debt maturity profile spreading the refinancing risk. The interest rates achieved are within anticipated budgeted levels. 2.2.3 In addition, there was a net increase in temporary borrowing activity of £28.0m, with £78.0m of new borrowing being offset by £50.0m falling due for repayment, and lease payments under existing finance lease and PPP obligations of £1.6m falling due for repayment. 2.2.4 The approach to borrowing is in line with the approved strategy, the Council sourcing long-term borrowing and whenever possible, taking advantage of temporary (short-term) borrowing at attractive rates and use of internal cash balances to meet the principal repayments, daily revenue account requirements and the capital financing requirement in lieu of future borrowing for capital purposes. The strategy adopted considers interest rate forecasts, the management of carrying costs and the retention of cash balances at appropriate levels, whilst managing the associated investment, interest, and liquidity risk. 2.2.5 The Council made a successful application to the PWLB to access the certainty rate which allows a 20-basis point (bps) (0.20%) discount on loans from the PWLB under the prudential borrowing regime. This will continue to provide the Council with an opportunity to borrow from the PWLB at more beneficial rates until 30 April 2023 and beyond, subject to a further successful application for 2023/2024 during April 2023. 2.3 Debt Restructuring 2.3.1 During the quarter under review, in conjunction with our Treasury advisors, we monitored the economic climate in relation to our financial targets and Treasury Management strategy. The interest rates prevailing throughout the period resulted in no beneficial opportunities for debt restructuring /rescheduling of the existing PWLB debt portfolio arising. 2.3.2 The Council continued to hold £3.0m of LOBO (Lender’s Option Borrower’s Option) loans where the lender has the option to propose an increase in the interest rate at set dates, following which the Authority has the option to either accept the new rate or to repay the loan at no additional cost. No banks exercised their option during the quarter.
Page 3
2.3.3 Further reports regarding future activity will be presented to Committee as appropriate. 2.4 Investments 2.4.1 At the end of the final quarter of 2022/23, the Council held total investments of £77.7m, which is a net increase of £22.9m in cash and cash equivalents, mainly due to a £30.8m increase in short-term investments, partly offset by an increase in the bank overdraft including cash in transit of £7.9m, as shown within column 6 of the attached Appendix 1. 2.4.2 The increase in short term investments reflects repayment of maturing temporary borrowing of approximately £415.2m and undertaking new short-term investments of £446.0m. 2.4.3 At quarter end, the bank overdraft including cash in transit was £7.5m which is a net overdrawn position compared to the net cash position of £0.5m at the end of the previous quarter. The negative net cash movement reflects BACS payroll and creditor payment runs which fell due for clearance at the end of the quarter. The bank overdraft primarily represents amounts drawn on the account at the 31 March 2023 comprising £7.6m of net BACS payments outstanding due for clearance within 3 days of the quarter end date, cheques unpresented of £0.2m, partly offset by a balance of £0.3m of cash in transit. 2.4.4 In line with the approved strategy to manage liquidity, the Council maintained a minimum balance of £3.0m available on an overnight basis (instant access), ensuring a prudent level of funds is maintained to meet all service requirements. 2.4.5 On 1 February 2023, the Bank of England Base Rate was increased from 3.50% to 4.00% and then by a further 0.25% to 4.25% on 22 March 2023, to help combat ongoing high inflation, fuelled by high energy and commodity prices and its impact on consumers cost of living as well as the low likelihood that the Russia-Ukraine hostilities will end any time soon with associated impact on supply chains. The increases in the Bank of England Base Rate over the period under review, resulted in short-dated cash rates ranging between 0.7% - 1.5% at the beginning of April, rising by around 3.5% for overnight/7-day maturities. There is no noticeable difference between the 7 day and 1-month SONIA bid rates and generally available investment rates offered by financial institutions and money market funds. Despite this, the Council will endeavour to achieve good performance levels in investment activity. 2.4.6 Overall the Treasury Management team continues to take a prudent approach to investing surplus funds in line with the approved 2022/23 Investment Strategy. Security of investment followed by ensuring sufficient liquidity are key investment criteria governing Council investment decisions. This approach is aligned to the prudent management of liquidity to meet current commitments and future cash demands based on the latest cashflow projections. Non-Treasury Management Investments 2.4.7 During the quarter, no repayments were made in respect of third-party advances in connection with the Cumbernauld Academy DBFM and Greenfaulds DBFM. 2.5 Interest Rate Movements & Other Economic Updates 2.5.1 Forecasters advise that the ongoing conflict in Ukraine continued to keep global inflation above central bank targets and the economic outlook for UK remains relatively weak with the chance of a mild recession. The economic backdrop during
Page 4
the January to March period continued to be characterised by high energy and commodity prices, high inflation, and the associated impact on household budgets and spending. The Bank of England, Federal Reserve and the European Central Bank all increased interest rates over the period and committed to combatting inflation, even in the face of potential recession. 2.5.2 As outlined above, the Bank of England increased the official Bank Rate to 4.25% over the period. The Monetary Policy Committee (MPC) has approved rises at every meeting this year, with most recent rises of 0.50% in February and 0.25% in March. The MPC in March again noted that domestic inflationary pressures remain elevated with growth stronger than was originally forecast in February’s MPC report. 2.5.3 UK inflation remained extremely high but there are tentative signs it may have peaked. Annual headline CPI reduced from 10.5% in December to 10.1% in January, before unexpectedly rising again to 10.4% in February with a further slight reduction to 10.1% in March. This was a lower reduction in March than envisaged, which may push the Bank of England to increase the Base Rate further in May. RPI remained steady at 13.4% in January, rising to 13.8% in February and falling slightly to 13.5% in March. This following the decision by the UK government under Rishi Sunak and Jeremy Hunt to reverse some of the support to household energy bills announced under Liz Truss, further support in the form of a cap on what energy suppliers could charge household was announced in the March Budget to run from April until the end of June 2023. Before the announcement, typical household bills had been due to rise to £3,000 a year from April. 2.5.4 The labour market remained tight through the period but there was some on-going evidence of potential softening demand for new labour at the end of the period. The unemployment rate for April 2022 of 3.8%, declined to 3.6% in July and picked up again to 3.7% in December and increased to 3.8% in March. Pay growth in March was 5.9% for total pay (including bonuses) and 6.6% for regular pay. However, once adjusted for inflation, both measures were negative and have been so throughout the year. 2.5.5 Uncertainty continued to be a key driver of financial market sentiment and bond yields remained relatively volatile due to concerns over elevated inflation and higher interest rates, as well as the likelihood of the UK entering a recession and for how long the Bank of England would continue to tighten monetary policy. Towards the end of the period, fears around the health of the banking system following the collapse of Silicon Valley Bank in the US and purchase of Credit Suisse by UBS caused further volatility. 2.5.6 Over the period the 5-year UK benchmark gilt yield rose from 1.41% to peak at 4.7% in September before ending the financial year at 3.36%. Over the same timeframe, the 10-year gilt yield rose from 1.61% to peak at 4.51% before falling back to 3.49%, whilst the 20-year yield rose from 1.82% to 4.96% and then reduced to 3.82%. This resulted in the PWLB 10 year borrowing rate reducing from 4.79% at the start of the quarter to 4.53% at the end of the quarter, showing a spread of 0.75% between the highest and lowest interest rate which were 4.87% and 4.12% respectively, averaging 4.51%. 2.5.7 A new HRA PWLB rate of gilt yield plus 0.4% (0.4% below the currently available certainty rate) was announced on 15th March 2023. This discounted rate is to support local authorities borrowing for Housing Revenue Accounts and the delivery of social housing and is expected to be available from June 2023, initially for a
Page 5
period of one year. A detailed review will be undertaken in conjunction with our treasury management advisors to establish if this is a borrowing opportunity that the Council can access. 2.5.8 Following the increases in the base rate in February and March, short-term borrowing interest rates increased with the short term 7-day offer rate ranging between 3.55% and 4.31% over the period. Taking account of the increase in borrowing rates and advice from our treasury management advisors, it was considered more cost effective in the near term to use a combination of internal resources or to borrow rolling temporary / short-term loans at lower interest rates where possible rather than long term borrowing. This will manifest itself in increased temporary borrowing costs for the Council partially offset by increased investment income earned on surplus balances but remains within budgetary forecasts. 2.5.9 The Treasury Management Section will continue to monitor financial and economic policy and their impact upon the Council’s investment and borrowing activity. 2.6 The Prudential Code for Capital Finance in Local Authorities 2.6.1 The Local Government in Scotland Act 2003 requires the Council to undertake its Treasury activities in line with the Prudential Code for Capital Finance in Local Authorities. 2.6.2 Committee, at its meeting on 10 March 2022, approved a report titled, “Treasury Management Strategy 2022/2023 and Treasury and Prudential Indicators 2022/2023 to 2024/2025”. This report detailed a variety of mandatory and local indicators aimed at assisting members to determine that proposed capital investment levels and treasury management decisions satisfied the key requirements of affordability, prudence and sustainability. Performance against key prudential indicators for 2022/23 to date is detailed within Appendix 2. 2.6.3 Committee will wish to note the following salient points:- (i) Indicator 1(a) illustrates that investment on capital expenditure is forecast to be lower than anticipated by £50.1m. This reflects decrease of £35.1m in the General Fund capital investment and £15.0m for the HRA Mainstream and New Build programmes. This is primarily due to the investment programmes continuing to face a number of risks and challenges associated with programme delivery including inflationary pressures as contractors continue to face issues with the supply of both labour, equipment and materials, and lower than budgeted purchases through the Council’s Buy Back Schemes. For further information, this is monitored in detail as part of the Council's capital programme reporting mechanisms which will provide spend details including any revisions to the estimates approved in 2022/23. (ii) The mix of resources used to finance the capital expenditure in 2022/23 reflect the updates to the forecast capital investment outlined above. Therefore, the level of in-year borrowing is anticipated to be lower by £80.5m due to a reduction in HRA and General Fund programmes of £59.1m and £21.4m respectively. The forecast level of borrowing also reflects a net increase in capital grants and external contributions of £19.9m with additional funds available to the General Fund and HRA programmes of £13.4m and £6.5m respectively. An additional £10.6m of CFCR is also available for the General Fund programme. (iii) As a result of accounting issues arising from the pandemic recovery, the implementation of IFRS 16 Lease Accounting has been delayed yet again.
Page 6
Therefore, a restatement of existing liabilities for operating leases to the credit arrangement category will not be applied in 2022/23, with the spend and associated financing under credit arrangements estimated to be £3.5m will be accounted for in future years. (iv) The Prudential Code requires the Council’s capital investment to be affordable and prudent. To demonstrate this, a Prudential Margin (the need to borrow versus actual borrowing) is calculated. Indicator 1(b) demonstrates a healthy prudential margin of £246.2m as at 31 March 2023. The timing and profile of external borrowing to replenish cash reserves and balances are being managed, giving full consideration to liquidity, interest rate and refinancing risk, whilst minimising the potential carrying costs. (v) Indicator 2 illustrates that both the overall authorised and operational borrowing limits for borrowing and long-term liabilities have not been exceeded, with the maximum borrowing undertaken within the period being well below the approved boundaries. (vi) Indicator 3(a) highlights the proportion of external interest payable by the Council which is fixed and external interest payable which may vary over the term of the borrowing, and which exposes the Council to the effects of interest rate changes. At 31 March 2023 the level of borrowing subject to variability is deemed to be within acceptable levels. (vii) Indicator 3(b) highlights a projected loan charge underspend of £0.1m compared to the prudential estimates for 2022/23. This projection takes into account the treasury management activity, the loans fund advances repayment policy adopted in 2021/22 and the decisions of the P&S Committee on 30 September 2021 and the SCDG to reprofile the capital programme in response to the significant delivery related challenges. This current loan charge underspend is made up of: • A net treasury management overspend of £0.3m is projected (£0.5m General Fund overspend offset by underspend of £0.2m HRA), which is a reflection of the cashflow management techniques adopted, directing the timing of new borrowing, managing investment security, liquidity and interest rate risk. • In 2022/23 it is anticipated there will be reduction in anticipated loans fund advance repayments of £0.4m (£0.1m and £0.3m for the General Fund and HRA respectively). This is primarily due to the Council benefiting from the revised loans fund advance repayment policy approved at the Finance and Resources Committee on the 26 November 2020, whereby the Council continues to use the annuity model, apply a fixed average life to the loans fund advances, and apply a prudent annuity rate. (viii) Indicator 3(c) relates to the level of fixed debt due to mature within time periods. The level of debt maturing remains within the upper limits set for each category at the beginning of the financial year. 3.1 Measures of Success Overall the approach adopted by the Council’s Treasury Management team during the quarter under review met the key requirements of the 2022/23 Treasury Management Strategy. Prudential indicators have remained in accordance with those approved by Committee on 10 March 2022. The projected final outturn illustrates a healthy prudential margin and borrowing levels that are below sustainable limits, ensuring that the projected
Page 7
capital investment levels remain affordable and sustainable. However, the current financial volatility and increased borrowing costs has resulted in an assessment being undertaken of the potential impact on future years of the current capital programme. This will continue to be monitored to determine if any further review of the programme is required to ensure that it remains sustainably affordable. 4. Supporting documents 4.1 Appendix 1: Loans, Long term Liabilities & Investments as at 31 March 2023 Appendix 2: Summary of Treasury and Prudential Indicators as at quarter ended 31 March 2023 Elaine Kemp Chief Officer (Finance)
Page 8
5. Impacts 5.1 Public Sector Equality Duty and Fairer Scotland Duty Does the report contain information that has an impact as a result of the Public Sector Equality Duty and/or Fairer Scotland Duty? Yes ☐ No ☒ If Yes, please provide a brief summary of the impact? If Yes, has an assessment been carried out and published on the council’s website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality- and-fairer-scotland-duty-impact-assessments Yes ☐ No ☐ 5.2 Financial impact Does the report contain any financial impacts? Yes ☐ No ☒ If Yes, have all relevant financial impacts have been discussed and agreed with Finance? Yes ☐ No ☐ If Yes, please provide a brief summary of the impact? 5.3 HR policy impact Does the report contain any HR policy or procedure impacts? Yes ☐ No ☒ If Yes, have all relevant HR impacts have been discussed and agreed with People Resources? Yes ☐ No ☐ If Yes, please provide a brief summary of the impact? 5.4 Legal impact Does the report contain any legal impacts (such as general legal matters, statutory considerations (including employment law considerations), or new legislation)? Yes ☐ No ☒ If Yes, have all relevant legal impacts have been discussed and agreed with Legal and Democratic? Yes ☐ No ☐ If Yes, please provide a brief summary of the impact? 5.5 Data protection impact Does the report / project / practice contain or involve the processing of personal data? Yes ☐ No ☒ If Yes, is the processing of this personal data likely to result in a high risk to the data subject? Yes ☐ No ☐ If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e- mailed to dataprotection@northlan.gov.uk Yes ☐ No ☐ 5.6 Technology / Digital impact Does the report contain information that has an impact on either technology, digital transformation, service redesign / business change processes, data management, or connectivity / broadband / Wi-Fi? Yes ☐ No ☒ If Yes, please provide a brief summary of the impact?
Page 9
Where the impact identifies a requirement for significant technology change, has an assessment been carried out (or scheduled) by the Enterprise Architecture Governance Group (EAGG)? Yes ☐ No ☐ 5.7 Environmental / Carbon impact Does the report / project / practice contain information that has an impact on any environmental or carbon matters? Yes ☐ No ☒ If Yes, please provide a brief summary of the impact? 5.8 Communications impact Does the report contain any information that has an impact on the council’s communications activities? Yes ☐ No ☒ If Yes, please provide a brief summary of the impact? 5.9 Risk impact Is there a risk impact? Yes ☒ No ☐ Treasury Management activity by its very nature has a number of inherent risks including interest rate, liquidity and refinancing risks. To minimise risk for its treasury management activities the Council adopts and operates in accordance with the guidelines for best practice prescribed within the CIPFA “Treasury Management in the Public Services” Code of Practice and the CIPFA Prudential Code for Capital Finance in Local Authorities. 5.10 Armed Forces Covenant Duty Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does it relate to healthcare, housing, or education services for in-Service or ex- Service personnel, or their families, or widow(er)s)? Yes ☐ No ☒ If Yes, please provide a brief summary of the provision which has been made to ensure there has been appropriate consideration of the particular needs of the Armed Forces community to make sure that they do not face disadvantage compared to other citizens in the provision of public services.
Page 10
LOANS, LONG TERM LIABILITIES & INVESTMENTS AS AT 31 MARCH 2023 Appendix 1 DEBT RESTRUCTURING BALANCE 1-January-23 EARLY REDEMPTION REFINANCING NEW BORROWING / LONG-TERM LIABILITIES PRINCIPAL REPAYMENTS NET CASH MOVEMENTS BALANCE 31-March-23 (1) (2) (3) (4) (5) (6) (7) LONG-TERM LOANS PWLB 402,123,229 0 0 60,000,000 (12,889,924) 47,110,076 449,233,305 MONEY MARKET LOANS 67,000,000 0 0 0 (10,000,000) (10,000,000) 57,000,000 ENERGY EFFICIENCY LOAN 1,003,658 0 0 0 (26,023) (26,023) 977,636 470,126,888 0 0 60,000,000 (22,915,947) 37,084,053 507,210,940.58 SHORT-TERM LOANS TEMPORARY 214,000,000 0 0 78,000,000 (50,000,000) 28,000,000 242,000,000 MUNICIPAL BANK 0 0 0 0 0 0 0 INTERNAL LOANS 6,280 0 0 0 0 0 6,280 214,006,280 0 0 78,000,000 (50,000,000) 28,000,000 242,006,280 LONG -TERM LIABILITIES FINANCE LEASE OBLIGATIONS 1,547,311 0 0 0 (4,503) (4,503) 1,542,808 LONG TERM LIABILITY 166,679,105 0 0 0 (1,553,058) (1,553,058) 165,126,047 168,226,416 0 0 0 (1,557,561) (1,557,561) 166,668,855 TOTAL EXTERNAL DEBT 852,359,583 0 0 138,000,000 (74,473,508) 63,526,492 915,886,075 INVESTMENTS THIRD PARTY ADVANCES 1,178,234 0 0 0 0 0 1,178,234 BANKS & OTHER FINANCIAL INSTITUTIONS 53,107,371.11 0 0 0 0 30,834,099 83,941,470 BANK OVERDRAFT INCL CASH IN TRANSIT 506,208 0 0 0 0 (7,959,069) (7,452,861) CASH & CASH EQUIVALENTS 54,791,813 0 0 0 0 22,875,030 77,666,843 NET BORROWING 797,567,770 0 0 138,000,000 74,473,508 40,651,462 838,219,232
Page 11
Summary of Treasury and Prudential Indicators as at quarter ended 31 March 2023 Appendix 2 1. Capital Expenditure, Capital Financing Requirement and Prudential Margin (a) Capital Expenditure Initial Estimate 2022/2023 (£m) Projected Outturn 2022/2023 (£m) Variance 2022/2023 (£m) Total spend : Capital Expenditure 296.5 246.4 50.1 Total spend : Credit Arrangement 0.0 0.0 0.0 Total Capital Investment 296.5 246.4 50.1 Financed By: Borrowing 207.2 126.7 80.5 Capital receipts 1.0 2.5 (1.5) Capital receipts transfer to Capital Fund 0.0 (1.5) 1.5 Capital Grants & Other External Contributions 61.2 81.1 (19.9) Capital from Current Revenue 27.1 37.7 (10.6) (b) Prudential Margin Calculation Initial Estimate 2022/2023 (£m) Projected Outturn 2022/2023 (£m) Variance 2022/2023 (£m) Capital Financing Requirement 1,321.8 1,207.3 114.5 Gross Borrowing 1,194.3 961.1 233.2 Prudential Margin 127.5 246.2 (118.7) 2. Authorised Limit and Operational Boundary Initial Authorised Limit 2022/2023 (£m) Initial Operational Boundary 2022/2023 (£m) Maximum Borrowing Level Q4 2022/2023 (£m) Borrowing 1,215.0 1,240.0 749.2 Other Long-term Liabilities 185.0 185.0 165.1 Totals 1,400.0 1,425.0 914.3 3. Treasury Management Indicators a) Interest Rate Exposures on External Interest Payments Position as at 31/03/2023 (£m) % External Interest Payable on Fixed Rate Loan Debt 22.8 98.1% External Interest Payable on Variable Rate Loan Debt 0.4 1.9% b) Loans Fund Revenue Account Initial Estimate 2022/2023 (£m) Projected Outturn 2022/2023 (£m) Variance £m) %age Loans Fund Interest Payments 30.0 30.8 (0.8) -2.7% Loans Fund Expenses 0.4 0.4 0.0 0.0% Total Loans Interest Payments & Expenses 30.4 31.2 (0.8) -2.7% Loans Funds Investment Income (0.2) (0.7) 0.5 -250.0% Total Loans Fund Interest Payments Investment Income & Expenses 30.2 30.5 (0.3) -1.0% Allocated as follows : Loans Fund Interest Payments Investment Income & Expenses:General Fund 17.6 18.1 (0.5) -2.9% Loans Fund Interest Payments Investment Income & Expenses:HRA 12.6 12.4 0.2 1.5% Capital Advances Repayments - General Fund 8.8 8.7 0.1 1.2% Capital Advances Repayments - HRA 10.1 9.8 0.3 3.4% Total Capital Advances 18.9 18.5 0.4 2.4% Total Loan Charges 49.1 49.0 0.1 0.3% c) Maturity Structure of Borrowing <12months 12 months to 2 years 2 to 5 years 5 to 10 years 10 to 20 years 20 to 40 years >40 years Upper Limit maturing :Fixed & Variable Rate Debt 15.0% 15.0% 25.0% 30.0% 35.0% 45.0% 30.0% Lower Limit maturing :Fixed & Variable Rate Debt 0.0% 0.0% 5.0% 5.0% 5.0% 10.0% 5.0% Maturity structure at the start of Q4 8.8% 4.7% 11.9% 11.9% 20.4% 36.8% 5.5% Maturity structure at the end of Q4 6.1% 4.1% 13.6% 15.3% 21.7% 34.1% 5.1%