MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE
held BY MICROSOFT TEAMS on WEDNESDAY, 20 DECEMBER 2023 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown
Councillor Amanda Hampsey
Councillor Daniel Hampsey
Councillor Graham Hardie 
Councillor Mark Irvine
Councillor Paul Donald Kennedy
Councillor Liz McCabe
Councillor Luna Martin
Councillor Dougie Philand
Councillor Peter Wallace 
Attending: Shona Barton, Governance Manager
Peter Bain, Development Manager
Sandra Davies, Major Applications Team Leader
Bryn Bowker, Area Team Leader – Mid Argyll, Kintyre and the Islands
Arlene Knox, Senior Planning Officer
Shelley Gould, Senior Planning Officer
Fiona Scott, Planning Officer
Norman Shewan, Planning Officer 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Audrey Forrest and Andrew Kain. 
2. DECLARATIONS OF INTEREST 
Councillor John Armour declared a non-financial interest in planning application reference
23/01018/PP as it concerned a farm neighbouring his own business and he had also been
lobbied by local residents.  He indicated that he would take no part in the determination of
this application which was dealt with at item 8 of this Minute, but would remain in the
meeting. 
3. MINUTES 
a) The Minute of the Planning, Protective Services and Licensing Committee held on 20
November 2023 was approved as a correct record. 
b) The Minute of the Planning, Protective Services and Licensing Committee held on 22
November 2023 at 11.00 am was approved as a correct record. 
c) The Minute of the Planning, Protective Services and Licensing Committee held on 22
November 2023 at 2.00 pm was approved as a correct record. 
d) The Minute of the Planning, Protective Services and Licensing Committee held on 22
November 2023 at 3.00 pm was approved as a correct record. 
e) The Minute of the Planning, Protective Services and Licensing Committee held on 28
November 2023 was approved as a correct record.

Page 2

4. TSL CONTRACTORS LTD: DETAILED PLANNING APPLICATION FOR THE
ERECTION OF RESIDENTIAL DEVELOPMENT COMPRISING 97 RESIDENTIAL
UNITS AND A COMMERCIAL UNIT (CLASS 1) WITH ALL ASSOCIATED
EXTERNAL WORKS AND LANDSCAPING: LAND NORTH WEST OF ISLE OF
MULL HOTEL, CRAIGNURE, ISLE OF MULL (REF: 22/01418/PP) 
The Major Applications Team Leader spoke to the terms of the report.  The proposal
seeks to develop an allocated housing site within LDP2 to provide 97 dwellings of various
sizes.  The site is located in the rural area, with the housing allocation playing a pivotal
role in meeting the housing needs of the island. 
The Examination by Scottish Government Reporters to the Argyll and Bute Local
Development Plan 2 (LDP2) has now concluded and the Examination Report has been
published.  Although still to be formally adopted it is considered that LDP2 carries
sufficient weight to outweigh the designation of land as countryside in the adopted LDP.   
The development would still be a minor departure from LDP2 as a small area to the north
west of the site lies out with the allocation and within the countryside zone.  No houses are
proposed in this area and it would be required to accommodate one of the two
Sustainable Urban Drainage Areas (SUDs) required for draining the site. 
It was recommended that planning permission be granted subject to the conditions and
reasons detailed in the report of handling. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 8/7/22; , supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan as
Existing
200661A-10-002 Rev.D 06/09/2022
Topographical
Survey Plan as
Existing
200661A-10003 Rev.A 06/09/2022
Location Plan –
Craignure
Context as
Existing
200661A-10-001 Rev.C 06/09/2022
Location Plan as
Proposed
200661A-PL-001 Rev.G 09/11/2023
Site Plan as
Proposed 
200661A-PL-003  Rev.C 9/11/2023
Site Cross 200661A-PL-002 Rev.A 18/08/2022

Page 3

Section Detail as
Proposed
External Levels
Layout
J5336-001  11/07/2022
Drainage Layout J5336-011 Rev.F 09/03/2023
Cottage Flats-
Affordable Plans
& Elevations
200661A-PL-010 Rev.A 18/08/2022
2 & 3 Bed
Terrace- AFF.
Plans &
Elevations
200661A-PL-011 Rev.B 06/09/2023
3 Bed Semi-
Detached –AFF
Plans &
Elevations
200661A-PL-012  11/07/2022
1 Bed Flats- PFS
Plans &
Elevations
200661A-PL-013 Rev.A 18/08/2022
2 Bed Flats –PFS
Plans &
Elevations
200661A-PL-014 Rev.A 18/08/2022
2 Bed Bungalow
– PFS Plans &
Elevations
200661A-PL-015 Rev.A 18/08/2022
3 Bed Flat &
Retail Uni- PFS
Plans &
Elevations
200661A-PL-016  Rev.B 05/04/2023
3 Bed Semi
Detached- PFS
Plans &
Elevations
200661A-PL-017 Rev.A 18/08/2022
3 Bed Detached-
PFS Plans &
Elevations
200661A-PL-018  11/07/2022
4 Bed Detached-
ST- PFS Plans &
Elevations
200661A-PL-019  11/07/2022
4 Bed Detached
In- PFS Plans &
Elevations
200661A-PL-020  11/07/2022
4 Bed Detached
Wide- PFS Plans
& Elevations
200661A-PL-021 Rev.A 18/08/2022
4 Bed Detached
Large- PFS
Plans &
Elevations
200661A-PL-022  11/07/2022
2 & 3 Bed
Terrace – AFF.
Combined Plans
200661A-PL-023 Rev.A 06/09/2022

Page 4

3 Bed Detached
– Handed Plans
& Elevations
200661A-PL-024  18/08/2022
4 Bed Detached
St – Handed
Plans &
Elevations
200661A-PL-025  18/08/2022
4 Bed Detached
Inv-Handed
Plans &
Elevations
200661A-PL-026  18/08/2022
4 Bed Detached
Wide-Handed
Plans &
Elevations
200661A-PL-027  18/08/2022
4 Bed Detached
Large-Handed
Plans &
Elevations
200661A-PL-028  18/08/2022
1 & 2 Bed Flats –
PFS Plans &
Elevations
200661A-PL-029  06/09/2022
Garage Units
Plans &
Elevations
200661A-PL-051  18/08/2022
Vehicle Swept
Path Analysis for
a Refuse Vehicle
J5336-004  11/07/2022
Proposed
Landscape
Layout
1641-01 Rev.F 18/08/2022
Softworks
Specification &
Maintenance
1641-03 Rev.B 04/07/2023
Proposed trees
to be removed &
retained
1641-02 Rev.B 04/07/2023
Waste Strategy &
Bin Storage
200661A-PL050  Rev.A 06/09/2022 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
Note to Applicant: 
• This planning permission will last for three years from the date of this decision
notice, unless the development has been started within that period [See section
58(1) of the Town and Country Planning (Scotland) Act 1997 (as amended).] 
• In order to comply with Sections 27A(1)  of the Town and Country Planning
(Scotland) Act 1997, prior to works commencing on site it is the responsibility of the
developer to complete and submit the attached ‘Notice of Initiation of Development’

Page 5

to the Planning Authority specifying the date on which the development will start.
Failure to comply with this requirement constitutes a breach of planning control
under Section 123(1) of the Act. 
In order to comply with Section 27B(1) of the Town and Country Planning (Scotland)
Act 1997 it is the responsibility of the developer to submit the attached ‘Notice of
Completion’ to the Planning Authority specifying the date upon which the development
was completed. 
2. Archaeological Works 
No development shall take place within the development site as outlined in red on the
approved plan until the developer has secured the implementation of a programme of
archaeological works in accordance with a written scheme of investigation which has
been submitted by the applicant, agreed by the West of Scotland Archaeology Service,
and approved by the Planning Authority. Thereafter the developer shall ensure that the
programme of archaeological works is fully implemented and that all recording and
recovery of archaeological resources within the development site is undertaken to the
satisfaction of the Planning Authority in agreement with the West of Scotland
Archaeology Service. 
Reason: In order to comply with the requirements of NPF4 Policy 16F. 
3. Requirement for Public Sewerage Connection 
The development hereby approved shall connect to the public sewerage system. 
Reason: The site is located within a settlement area served by a public sewer.  The
use of a private system would be a material change and would require the submission
of a further planning application. 
4. Open Space Provision 
No development shall commence until details for the provision and maintenance of
areas of communal open space and equipped play area(s) identified on the approved
plans have been submitted to and approved in writing by the Planning Authority. The
details shall comprise: 
(i) Provision to satisfy the minimum standards set out in the Development Plan; 6sqm
of equipped play space and 12sqm of informal open space per dwelling unit;
(ii) Specification of play equipment to be installed, including surface treatments and
any means of enclosure, designed in accordance with the provisions of BS5696
(Play Equipment Intended for Permanent Installation Outdoors);
(iii) Proposals for the timing of the implementation of the play area(s) in relation to the
phasing of the development.  The equipped children’s play area shall be completed
before the occupation of the 50th dwelling;
(iv) A maintenance schedule for communal open spaces and equipped play areas in
accordance with the provisions of BS5696 including details of on-going inspection,
recording and procedures for detailing with defects.

Page 6

The communal open space and equipped play area(s) shall be provided in accordance
with the duly approved details and shall be retained and maintained to the specified
standards thereafter. 
Reason: In order to secure provision of communal open space and equipped play
areas within the development in accordance with the requirements of NPF4 Policy
16F. 
5. Construction Environmental Management Plan 
No construction works shall be commenced until a Construction Environmental
Management Plan (CEMP) and a Site Waste Management Plan (SWMP) have been
submitted to and approved in writing by the Planning Authority.  The CEMP shall be
overseen by an Ecological Clerk of Works (ECoW) and shall cover the following
details: 
Public Protection Issues: 
a) Consideration of all local noise sensitive receptors and the impact which
would be had during land clearance and construction and the controls for
this
b) The use of equipment, such as mobile crushers and pecking equipment
which may be in use and the controls which are put in place for these
c) Any controls for dust on the site to ensure that this does not cause a
nuisance to nearby receptors
d) Any site lighting which may be used during the project and how this will be
controlled so as not to cause a light nuisance to local receptors
e) Proposed hours of works
f) Best Practical Means measures to be put in place during any land clearance
and construction work phases.  
Biodiversity Issues: 
(a)        No development shall commence until a scheme for the retention and
safeguarding of trees during construction has been submitted to and
approved by the Planning Authority. The scheme shall comprise: 
i) Details of all trees to be removed and the location, canopy spread and
root zone of trees to be retained as part of the development;
ii) A programme of measures for the protection of trees during construction
works which shall include fencing at least one metre beyond the canopy
spread taking account of root zone of each tree in accordance with BS
5837:2012 “Trees in Relation to Design, Demolition and Construction”. 
Tree protection measures shall be implemented for the full duration of
construction works in accordance with the duly approved scheme. No trees
shall be lopped, topped or felled other than in accordance with the details of
the approved scheme unless otherwise approved in writing by the Planning
Authority. 
(b)        Prior to the commencement of development an updated habitat survey shall
be carried out, the findings of which shall be submitted to and approved in

Page 7

writing with the planning authority- this information should form part of a
Habitat Management Plan. 
(c)        If tree works are proposed during the bird nesting season (March – August
inclusive) a pre-commencement inspection for active bird nests should be
carried out by a suitably qualified person.  Only if there are no active nests
present should works proceed.
(d)        Otter mitigation shall be undertaken in accordance with the
recommendations contained within the original ecological survey for otter
- An ecological toolbox talk will be presented to all site contractors as part of
their pre-works site induction in accordance with best practice;
- Where the species data is older than 18 months, the reported baseline
should be updated by further survey work and included as part of a Species
Management Plan outlining the species management for each of the species
mentioned ( Otter, Bats both European protected Species, birds ( none
specific). 
(e)        If any of the trees which have been identified as being suitable for bats are
to be removed between May-September, a further inspection of these trees
shall be carried out by a licensed Bat worker prior to their removal. A
European Protected Species Licence will need to be acquired from
NatureScot in order for the bats to be translocated by a licenced Bat Worker. 
(f)         An ecological toolbox talk on bats and what to do if bats or field signs of
bats are encountered shall be presented to all site contractors as part of
their pre-works site induction.         
Further information can be found in the Biodiversity Technical Note in terms
of surveys and mitigation calendars Page 20 and 21: https://www.argyll-
bute.gov.uk/sites/default/files/biodiversity_technical_note_feb_2017_4.pdf 
(i)        An Invasive Non Native Species Eradication Plan for Rhododendron
ponticum should be included in the CEMP ready for implementation. 
(j)      Details of pollution controls during construction.         
Reason:  In order avoid, minimise or mitigate effects on the environment and
surrounding area. 
6. White Tailed Sea Eagle           
Prior to the commencement of development confirmation of the outcome of
discussions with the Mull RSPB Officer (currently Dave Sexton) with regard to
requirements for a Bird Protection Plan for White Tailed Eagle shall be submitted to
and approved in writing by the Planning Authority. In the event that a Bird Protection
Plan is required, this shall be submitted to and approved in writing by the Planning
Authority prior to the commencement of development.  Thereafter the development
shall proceed in accordance with this plan. 
Reason: In order to establish whether a Bird Protection Plan will be required as the
nesting locations of White Tailed Sea Eagles varies each year.

Page 8

7. Drainage Maintenance Arrangements 
Prior to the commencement of approved drainage works, details of the maintenance
responsibility and schedule of intended maintenance arrangements of the approved
drainage works shall be provided to the Planning Authority for their approval. This
schedule shall include inspection, recording and procedures for detailing with defects.
For the avoidance of doubt this shall also include the maintenance of the SUDs ponds.
The drainage works for the development shall thereafter be maintained in accordance
with the approved details. 
Reason: To ensure appropriate maintenance provisions in respect of the approved
drainage details are secured in the interests of alleviating any potential flood risk
arising from surface water.   
8. Landscaping Details 
No development shall commence until a scheme of boundary treatment, surface
treatment and landscaping has been submitted to and approved in writing by the
Planning Authority. The scheme shall comprise a planting plan and schedule which
shall include details of: 
i) Existing and proposed ground levels in relation to an identified fixed datum;
ii) Existing landscaping features and vegetation to be retained;
iii) Location design and materials of proposed walls, fences and gates;
iv) Proposed soft and hard landscaping works including the location, species
and size of every tree/shrub to be planted;
v) Details of compensatory tree planting as show on the proposed landscape
drawing produced by Hirst Landscape Architects (1641 01 rev F).
vi) A programme for the timing, method of implementation, completion and
subsequent on-going maintenance.
vii) Surface materials proposed for private communal parking areas. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme unless otherwise approved in writing by the Planning Authority. 
Any trees/shrubs which within a period of five years from the completion of the
approved landscaping scheme fail to become established, die, become seriously
diseased, or are removed or damaged shall be replaced in the following planting
season with equivalent numbers, sizes and species as those originally required to be
planted unless otherwise approved in writing by the Planning Authority. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity. 
9. Road Built to Adoptable Standards 
All new roads other than private accesses serving no more than 5 dwellings shall be
built to an adoptable standard in accordance with Designing Streets and the National
Roads Development Guide. 
Reason: In the interests of road safety to ensure the provision of a road commensurate
to the scale of development.

Page 9

10. 20mph Speed Limit 
Within 12 months of the occupation of the first dwelling house the internal road network
shall have a 20mph limit. 
Reason: In the interests of road safety. 
11. Junction Improvements 
Full details of improvements to the existing junction of the UC80 and the A849 shall be
submitted to and approved in writing by the Planning Authority in consultation with the
Road Network Manager.  This shall include resurfacing of the UC80 east footway from
the junction of the development to the A849. 
Reason: In the interests of road safety. 
12. Visibility Splays 
Prior to work starting on site the junction of the development access with the UC80
shall have a visibility splay of 42m x 2.4m x 1.05m.  The final wearing surface on the
access shall be completed prior to the development first being brought into use and the
visibility splays shall be maintained clear of all obstructions thereafter. 
Reason: In the interests of road safety. 
13. 40mph Speed Limit 
No development shall commence until a 40mph speed limit is introduced on the A849
from the existing 30mph limit at Craignure to an agreed location west of the UC80. 
Prior to the implementation of this speed limit full details of the extent of the speed limit
shall be submitted to and approved in writing by the Planning Authority in consultation
with the Road Network Manager. 
Reason: In the interests of road safety. 
14. Traffic Management Plan 
Prior to development commencing, a Traffic Management Plan shall be submitted to
and approved in writing by the Planning Authority in consultation with the Area Roads
Engineer. The Plan shall detail the phasing of the construction elements of the
development, a proposed phasing schedule of the plant and materials deliveries to
site, proposed and approved access routes, agreed operational practices, and shall
provide for the provision of an appropriate Code of Practice to drivers of construction
and delivery vehicles. The development shall be implemented in accordance with the
duly approved Traffic Management Plan unless as otherwise may be agreed in writing
by the Area Roads Engineer. 
Reason: To address traffic associated with the construction of the development in the
interests of road safety and having regard to the access arrangements to the site. 
15. Electric Vehicle Charging

Page 10

Prior to any dwelling being occupied which has private in-curtilage parking provision, 
dedicated cable ducting connecting each private residential parking space to the
nearest electricity supply connection point capable of supporting the installation of a 7
kilowatt EV charging point shall be provided. 
Prior to dwellings being occupied where communal parking is proposed, a minimum of
one EV charging point for every five residential communal off street spaces shall be
provided.  In addition, dedicated cable ducting shall be installed to allow all remaining
communal parking spaces to be provided with a charging point in the future. 
Reason: To ensure that the development has adequate provision for the charging of
EVs in accordance with policy 34 of LDP2. 
16. Biodiversity Enhancement Measures 
Biodiversity enhancement measures shall be undertaken in accordance with the
Biodiversity Measures document dated 11th July 2023.  Prior to the occupation of the
first dwelling further details of the proposed enhancements as detailed in this
document including their design, location and timing of completion shall be submitted
to and approved in writing by the Planning Authority.  Thereafter these biodiversity
enhancement shall by maintained in accordance with these details. 
Reason:  To ensure that the development includes biodiversity enhancements as
required by NPF4 Policy 3. 
17. No Permission for Care Home or Nursery 
No permission is given or implied for the proposed nursery or care home shown
indicatively on the approved site plan. 
Reason:  For the avoidance of doubt.   
18. Hours of Construction 
The permitted hours of construction works shall be restricted to 08:00 hours to 18:00
hours Monday to Friday and 08:00 hours to 13:00 hours on Saturday. No construction
works shall take place outwith these hours, or on Sundays or Bank Holidays, unless
the written agreement of the Planning Authority has been obtained in advance, in
which case the specified operations shall be confined to activities which do not present
any likely source of nuisance in terms of noise, vibration, dust or any other
consequence likely to be prejudicial to the interests of residential amenity. 
Reason: In order to protect the residential amenities of the area. 
19. Affordable Housing 
Plots 74 to 97 shall only be managed by a Registered Social Landlord (a body
registered under part 3 chapter 1 of the Housing (Scotland) Act 2001, or any
equivalent provision in the event of the revocation and re-enactment thereof, with or
without modification) and shall not enure for the benefit of any other person, company
or organisation.

Page 11

Reason: To ensure the provision of affordable housing to the standard required by the
development plan in the absence of any other agreed means of securing such
provision. 
20. Materials 
No development shall commence until full details /samples of materials to be used in
the construction of the dwelling houses and commercial unit hereby approved have
been submitted to and approved in writing by the Planning Authority.  The
development shall thereafter be completed using the approved materials or such
alternatives as may be agreed in writing with the Planning Authority. 
Reason:  In order to integrate the development into its surroundings. 
21. Arrangements for Waste 
No development shall commence until a waste strategy detailing how much waste
the proposal is expected to generate and detailing the arrangements for the storage,
separation and collection of waste from the site, including provision for the safe pick
up by refuse collection vehicles, have been submitted to an approved in writing by the
Planning Authority. Thereafter the duly approved provision shall be implemented prior
to the first occupation of the dwellings which it is intended to serve. 
Reason:  In order to ensure that satisfactory arrangements have been made for
dealing with waste on the site in accordance with NPF4 Policy 12 and Policy SG LDP
SERV 5 (b). 
22. Finished Floor Levels 
No development shall commence until details of the proposed finished ground floor
level of the development relative to an identifiable fixed datum located outwith the
application site have been submitted to and approved in writing by the Planning
Authority. The development shall be implemented in accordance with the approved
details. 
Reason: In order to secure an acceptable relationship between the development and
its surroundings.
23. Phasing of Development
The development hereby approved shall be constructed in accordance with the
potential phasing plan contained within the supporting Design and Access Statement
(8.1 Potential Phasing, p53) unless otherwise agreed in writing with the Planning
Authority.
Reason: In order to ensure that the affordable housing is delivered in a timely manner. 
24. Prior to the commencement of development full details of water conservation
measures to be included within the development shall be submitted to and approved in
writing by the Planning Authority.  Thereafter the development shall be implemented
with these details.

Page 12

Reason: In the interests of water conservation. 
(Reference: Report by Head of Development and Economic Growth dated 7 December
2023, submitted) 
5. MRS KAREN DAVIES: PARTIAL CHANGE OF USE OF FLAT TO FORM
TEACHING FACILITIES: 3 WOODSTONE COURT, PIER ROAD, RHU,
HELENSBURGH (REF: 22/01712/PP) 
The Planning Officer spoke to the terms of the report.  He advised of a correction to the
report of handling in respect of comments submitted by Environment Health and stated
that these comments detailed within the report did not have the status of a full consultation
response and related to an informal communication between Officers. 
The proposed development is a partial change of use where a total of some 60m² of floor
space is proposed to be used as a retreat centre to learn meditation and mindfulness with
spiritual teaching.  The proposed use will operate with weekly programmes largely within
the hours of 9.30 -16:30 with occasional evening use within the hours 19:00 – 21:30.   
The site is located within the residential area in the settlement of Rhu.  A total of 19
representations have been received, 4 in support and 15 objections, the details of which
were contained within section F of the report. 
It was considered highly likely that the proposal would result in an inadequate level on-site
car parking provision leading to increased demand for car parking in non-designated
parking areas, private roads and public roads within the locality to the detriment of
highway safety and the free-flow of traffic. In the absence of adequate information to
demonstrate otherwise, Officers consider that the proposal is contrary to the provisions of
NPF 4 Policy 13; the adopted LDP – 2015 Policy LDP 11 and SG LDP TRAN 4 and SG
LDP TRAN 6; and LDP 2 Policy 40. 
Officers also considered that the proposal was an inappropriate use in a residential
context and was contrary to the provisions of LDP Policy 8 and 9, SG LDP BAD 1 and
Proposed LDP2 Policy 14.   
It was therefore recommended that planning permission be refused for the reasons
detailed in the report of handling. 
Decision 
The Committee agreed to refuse planning permission for the following reasons: 
1. Argyll and Bute Local Development Plan – Adopted 2015 Policy LDP 8 and SG LDP
BAD 1 – Bad Neighbour Development and the emerging Proposed Argyll and Bute
Local Development 2 Policy 14 serves to resist any proposal that would have an
unacceptable adverse impact upon the amenity of neighbouring land uses resulting
from noise, vibration, etc. In addition Policy LDP 9 – Development Setting, Layout and
Design seeks to ensure that a high standard of appropriate design that is compatible
with the surroundings. It is considered that the nature and scale of the proposal which
is a non-residential institutional use, proposed to have week-long courses for groups of
12-15 teachers/students/practitioners within two rooms of a 2-bedroom flat contained
in a block of 9 no. residential units is inappropriate. This is due to the access to the
proposed teaching/retreat use from the grounds of the building, being via a communal

Page 13

hallway and stairwell shared with a number other residential properties. The flat
subject of the application is located on the first floor, with other flats located directly
above and below it. No information has been submitted to date with regard to the
construction specification of the floor zones between these flats, or the sound
insulation performance of the floor construction. In addition, no sound surveys between
the flats has been submitted in support of the application. There is a conflict with
existing homogenous residential use and potential significant adverse impact on
residential amenities. Therefore, this proposal is inappropriate use in a residential
context and is contrary to the provisions of LDP Policy 8 and 9, SG LDP BAD 1 and
Proposed LDP 2 Policy 14. 
2. Argyll and Bute Local Development Plan – Adopted 2015 Policy 11 and SG LDP TRAN
6; and the emerging Proposed Argyll and Bute Local Development Plan 2 Policy 40
serve to require that proposed development that will result in an intensification of traffic
and demand for car parking will only be supported where the proposed development
includes adequate on site car parking to accommodate all existing car parking
demand, and any intensification of demand by virtue of the development proposal. It is
considered that the proposed partial change of use from a 2 bedroom residential flat to
a commercial use comprising a retreat centre to teach and practice spiritual disciplines
including meditation and mindfulness by means of weekly programmes for groups of
12-15 participants during the hours of 9.30-4.30, with the occasional evening use 7-
9.30, will result in a substantial intensification of traffic using the existing public/private
access regime and on site car parking provision. Whilst the applicant has suggested
that groups attending the sessions will be bussed in and out of the premises using a
mini-bus or similar, officers do not consider that this is a sufficiently robust justification
for accepting development that appears, on the basis of information submitted, to be
deficient in car parking spaces with reference to the Council’s adopted standards. The
supporting information indicates that there are 15 no. existing spaces however this
cannot be verified from the drawings submitted and it is not clear that all of these
spaces are within the ownership or control of the applicant. Existing parking provision
would be based on an application of the standards for residential units i.e the number
of residences and the number of bedrooms that each residence has. The adopted
standard is 1½ spaces per 1-bedroom unit, 2 spaces per 2-3 bedroom unit; and 3
spaces per unit with 4 or more bedrooms. The applicant has submitted inadequate
information to allow an assessment of the number and location of existing on-site
parking spaces to meet the current demand. The adopted parking standards relative to
a non-residential institution use is 1 space per two staff plus 3 spaces per 100m2. The
application drawings show approximately 75m2 of floorspace to be used for
teaching/meditation, which would result in a minimum requirement for 1 additional
parking space, plus a further space per two staff members, including visiting teachers.
However, as the supporting information advises, it is intended that the rooms be used
by groups of up to 15 people at a time, which will result in a significantly higher
demand for car parking provision than an application of the adopted standards. The
information submitted does not demonstrate to the satisfaction of the planning
authority that the proposal can provide adequate space for car-parking and
manoeuvring within the site to accommodate the current demand for car parking, plus
the intensified demand likely to result from the proposed change of use with regard to
adopted standards. It is considered highly likely that the proposal would result in an
inadequate level on-site car parking provision leading to increased demand for car
parking in non-designated parking areas, private roads and public roads within the
locality to the detriment of highway safety and the free-flow of traffic. In the absence of
adequate information to demonstrate otherwise, officers consider that the proposal is

Page 14

contrary to the provisions of NPF 4 Policy 13; the adopted LDP – 2015 Policy LDP 11
and SG LDP TRAN 4 and SG LDP TRAN 6; and LDP 2 Policy 40. 
(Reference: Report by Head of Development and Economic Growth dated 7 December
2023, submitted) 
Councillor Dougie Philand joined the meeting during consideration of the foregoing item. 
6. MR KEVIN BURNETT: RENEWAL OF PLANNING PERMISSION IN PRINCIPLE
REFERENCE 18/02720/PPP - SITE FOR PROPOSED RESIDENTIAL
DEVELOPMENT: SITE AT LONAN DRIVE, OBAN: (REF: 23/00376/PPP) 
The Planning Officer spoke to the terms of the report.  Before proceeding with her
presentation she advised of an email received from Mr Moncrieff attaching a video which
showed water running through the site.  No commentary accompanied this video and
there was no indication of when the video had been taken. 
This application is seeking to secure Planning Permission in Principle (PPP) for a
residential development on an area of land at Lonan Drive, Oban. 
The principle of the development on this site has been established by the granting of PPP
reference 18/02720/PPP following a discretionary pre determination hearing.  Whilst the
previous PPP expired on 31 March 2023, it is considered to represent a material
consideration in the current application which was submitted and validated within the
lifetime of the previous permission and which effectively seeks to renew the original PPP. 
The application has been the subject of 77 objections from 66 households, one
representation and an objection from Oban Community Council.  Officers consider that
issues and concerns expressed do not raise any matters that were not previously
considered at the hearing. 
Since the previous permission was granted, there has been no change in the main policy
background within this area and there have been no material changes in circumstances in
the locality or in the previously approved access or servicing arrangements which would
preclude the renewal of the previous permission. 
It was recommended that planning permission in principle be granted subject to the
conditions and reasons detailed in the report. 
Decision 
The Committee agreed to grant planning permission in principle subject to the following
conditions and reasons: 
Standard Time Limit Condition (as defined by Regulation) 
Additional Conditions 
1. PPP – Matters Requiring AMSC Submission 
Plans and particulars of the matters specified in conditions 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14
and 15 below shall be submitted by way of application(s) for Approval of Matters Specified in
Conditions in accordance with the timescales and other limitations in Section 59 of the Town

Page 15

and Country Planning (Scotland) Act 1997 as amended. Thereafter the development shall be
completed wholly in accordance with the approved details. 
Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act 1997 as
amended. 
Note to Applicant 
Regard should be had to Scottish Waters consultation comments and the Oban and District
Access Panels comments in relation to the proposed development, details of which are
available to view via the Public Access section of the Council’s website. 
2. PPP – Approved Details 
The development shall be implemented in accordance with the details specified on the original
application form dated 18/12/18 and the previously approved drawings listed in the table
below. 
Plan Title. Plan Ref. No. Version Date Received
Site and Location Plan  1441 01  b 09/03/23
Indicative Site Plan & Site
Sections 
1440 L(--)01 g 09/03/23
Site Sections  1440 L(--)02 a 09/03/23
Road Layout at Lonan Drive  601775-DRG-0001-
P1 
09/03/23
Road Details at Lonan Drive  601775-DRG-0002-
P1 
09/03/23 
Reason:  To accord with Regulation 28 of the Town and Country Planning (Development
Management Procedure) (Scotland) Regulations 2008. 
3. PPP – Timescale to be Agreed for Completion 
Pursuant to Condition 1 - no development shall commence until details of the proposed
timescale for completion of the approved development have been submitted to and approved
by the Planning Authority. Thereafter, the development shall be implemented in accordance
with the duly approved timescale for completion unless an alternative timescale for completion
is otherwise agreed in writing with the Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F. 
4. PPP – Roads and Access 
Pursuant to Condition 1 – no development shall commence until details of the proposed
service road and connection with the existing public road have been submitted to and
approved by the Planning Authority. Such details shall incorporate: 
i) A vehicular access layout providing a Road over which the public has a right of access in
terms of the Roads (Scotland) Act 1984;
ii) A turning head for the public service vehicle;
iii) Details of the priority signage for the access into the site. 
Prior to work starting on site, the junction with the existing public road shall be fully formed and
surfaced with all access roads and footways granted consent constructed to at least base
course level prior to any work starting on the erection of the buildings which they are intended
to serve and the final wearing surface of the roads and footways shall be applied concurrently
with the construction of the final building.

Page 16

Reason: In the interests of road safety and to ensure the timely provision of a service road
commensurate to the scale of the overall development and having regard to the status of the
proposed access as a residential service road. 
Note to Applicant: 
Road Construction Consent under the Roads (Scotland) Act 1984 must be obtained from the
Council’s Roads Engineers and a Road Bond provided prior to the formation of the access
within the development site. 
5. PPP – Parking Provision 
Pursuant to Condition 1 – no development shall be commenced in respect of any individual
building until plans and particulars of the means of parking/turning arrangements to serve that
building have been submitted to and approved by the Planning Authority. Such details shall
incorporate:   
i) The provision of parking and turning in accordance with the requirements of
Supplementary Guidance SG LDP TRAN 6 of the adopted ‘Argyll and Bute Local
Development Plan’ 2015. 
The approved parking and turning layout to serve the buildings shall be implemented in full
prior to that building first being occupied and shall thereafter be maintained clear of obstruction
for the parking and manoeuvring of vehicles. 
Reason: In the interests of road safety. 
6. PPP – Sustainable Drainage System 
Pursuant to Condition 1, no development shall commence on site until full details, in plan form,
of the land drainage design for the site and details of its ongoing maintenance has been
submitted to and approved in writing by the Planning Authority.  Such details shall show a
drainage system designed in accordance with CIRIA C753 and Sewers for Scotland 4th
Edition. 
Reason:  In order to safeguard the development from the possibility of flooding. 
Note to Applicant 
Regard should be had to JBA Consulting Ltd consultation comments in relation to the
proposed development, details of which is available to view via the Public Access section of
the Council’s website. 
7. PPP – Design and Finishes 
Pursuant to Condition 1 – no development shall commence in respect of any individual building
until plans and particulars of the site layout, open space, design and external finishes of the
development have been submitted to and approved by the Planning Authority. These details
shall incorporate: 
i) A Design Statement in accordance with the advice set out in Planning Advice Note
68 which shall establish the design principles applicable to the layout of the
development as a whole and design of the individual dwellings. 
ii) A statement addressing how the proposed development has been designed to be
consistent with the six qualities of successful places, as defined within NPF4 Policy
14;

Page 17

iii) A statement addressing the Action Checklist for developing design contained within
the Argyll and Bute Sustainable Design Guide 2006;
iv) Local vernacular design. 
Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act 1997 as
amended, and in order to integrate the proposed dwellinghouse with its surrounds. 
8. PPP – Landscaping  
Pursuant to Condition 1 – no development shall commence until a scheme of boundary
treatment, surface treatment and landscaping has been submitted to and approved by the
Planning Authority. The scheme shall comprise a planting plan and schedule which shall
include details of: 
i) Existing and proposed ground levels in relation to an identified fixed datum;
ii) Existing landscaping features and vegetation to be retained;
iii) Location design and materials of proposed walls, fences and gates;
iv) Proposed soft and hard landscaping works including the location, species and size
of every tree/shrub to be planted;
v) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity and how these benefits will be
maintained for the lifetime of the development;
vi) A programme for the timing, method of implementation, completion and subsequent
on-going maintenance; 
All of the hard and soft landscaping works shall be carried out in accordance with the approved
scheme unless otherwise approved in writing by the Planning Authority.
Any trees/shrubs which within a period of five years from the completion of the approved
landscaping scheme fail to become established, die, become seriously diseased, or are
removed or damaged shall be replaced in the following planting season with equivalent
numbers, sizes and species as those originally required to be planted unless otherwise
approved in writing by the Planning Authority. 
All physical biodiversity enhancement measures (bird nesting boxes, ‘swift bricks’, wildlife
ponds, bat and insect boxes, hedgehog homes etc.) shall be implemented in full before the
development hereby approved is first brought into use. 
All biodiversity enhancement measures consisting of new or enhanced planting shall be
undertaken either in accordance with the approved scheme of implementation or within the
next available planting season following the development first being brought into use. 
The biodiversity statement should refer to Developing with Nature guidance | NatureScot as
appropriate. 
Reason:  To assist with the integration of the proposal with its surroundings in the interests of
amenity. 
9. PPP – Tree Retention and Protection 
Pursuant to Condition 1 – no development shall commence until a scheme for the retention
and safeguarding of trees during construction has been submitted to and approved by the
Planning Authority. The scheme shall comprise: 
i) A survey of trees on and overhanging the site indicating the location, species,
height, canopy spread and condition of each tree;

Page 18

ii) An assessment of the amenity and nature conservation value of tree groups and
individual trees which shall inform the layout of the development proposed;
iii) Details of all trees to be removed and the location and canopy spread of trees to be
retained as part of the development;
iv) A programme of measures for the protection of trees during construction works
which shall include fencing at least one metre beyond the canopy spread of each
tree in accordance with BS 5837:2012 “Trees in Relation to Design, Demolition and
Construction”. 
The tree survey should be undertaken prior to drafting the design plan for the placement of
dwellings, verges, access routes and services. 
Tree protection measures shall be implemented for the full duration of construction works in
accordance with the duly approved scheme. No trees shall be lopped, topped or felled other
than in accordance with the details of the approved scheme unless otherwise approved in
writing by the Planning Authority. 
Reason: In order to retain trees as part of the development in the interests of amenity and
nature conservation. 
10. PPP – Japanese Knotweed Eradication Scheme 
Pursuant to Condition 1 – no development shall commence on site until full details of a scheme
for the eradication of Japanese Knotweed has been submitted to and approved in writing by
the Planning Authority in consultation with the Biodiversity Officer.  The scheme shall include a
timetable for implementation and clearly identify the extent of the Japanese Knotweed on a
scaled plan.  Prior to construction works commencing on site the approved scheme and
timetable shall be implemented in full and a validation report confirming details of the
remediation treatment carried out and confirmation that the site is free of Japanese Knotweed
shall be submitted to the Planning Authority. 
Reason:  To eradicate Japanese Knotweed from the development site and to prevent the
spread of this non-invasive species through development works. 
11. PPP – Affordable Housing 
Pursuant to Condition 1 - no development shall commence until a scheme for the provision of
affordable housing (as defined below) has been submitted to and approved by the Planning
Authority. The scheme shall: 
a) Provide that a minimum of 25% of the approved dwellings are affordable homes; 
b) Define those properties to be used as affordable homes;
c) Establish the timing of their provision relative to the phasing of the development, which
shall ensure that the last 25% of the dwellings within the development are not commenced
until the affordable housing phase has been completed for occupation;
d) Establish the arrangements to ensure the affordability of the affordable homes for both
initial and subsequent occupiers (including any discount rate applicable in terms of (ii)
below); 
For the purposes of this condition ‘affordable homes’ are defined as being either: 
i) Social housing (rented or shared ownership or shared equity) managed by a registered
social landlord (a body registered under part 3 chapter 1 of the Housing (Scotland) Act
2001, or any equivalent provision in the event of the revocation and re-enactment thereof,
with or without modification);
ii) Discounted low cost sale housing (subject to a burden under the Title Conditions
(Scotland) Act 2003), or any equivalent provision in the event of the revocation and re-
enactment thereof, with or without modification).

Page 19

iii) Housing for sale or rent without subsidy, which is designed to be affordable and to meet
the housing needs of the majority of those households identified as in housing need in the
Local Housing Strategy or Housing Market Study i.e. one or two person households on
average income, with conditions attached to their missives to prevent further extension,
thereby helping to ensure that they are likely to remain affordable to subsequent
purchasers. 
The development shall be implemented and occupied thereafter in accordance with the duly
approved scheme for affordable housing. 
Reason:  To accord with the provisions of the Development Plan in respect of affordable
housing provision. 
12. PPP – Ecological Surveys 
Pursuant to Condition 1 - no development shall commence until full details of a Bat Survey and
Red Squirrel Survey have been submitted to and approved in writing by the Planning Authority
in Consultation with the Biodiversity Officer.  Such details shall include when the surveys are to
be carried out, the methodology to be employed in both surveys and any mitigation measures,
including a timetable for the implementation of mitigation measures. 
Reason:  To prevent the disturbance of Protected Species. 
Note to Applicant 
Regard should be had to the Council’s Biodiversity Officers consultation comments in relation
to the proposed development, details of which is available to view via the Public Access
section of the Council’s website. 
13. PPP – Peat Survey 
Pursuant to Condition 1- no development shall commence until full details of a Peat Survey
and Management Plan has been submitted to and approved in writing by the Planning
Authority in consultation with the Biodiversity Officer.  Such details shall provide details of the
depth of the peat deposit on site. 
Reason: In order to protect natural heritage assets. 
Note to Applicant: 
Should the survey determine the depth of peat to be in excess of 0.5 metres the applicant will
require to liaise with SEPA for advice on management. 
Regard should be had to the Council’s Biodiversity Officers consultation comments in relation
to the proposed development, details of which is available to view via the Public Access
section of the Council’s website. 
14. PPP – Open Space/Play Areas 
Pursuant to Condition 1 – no development shall commence until details for the provision and
maintenance of proposed areas of communal open space and equipped play area(s) within the
development have been submitted to and approved by the Planning Authority. The details shall
comprise: 
i) A plan showing the location and extent of communal open space and equipped play areas;
ii) Provision to satisfy the minimum standards set out in the Development Plan; 6sqm of
equipped play space and 12sqm of informal open space per dwelling unit;

Page 20

iii) Specification of play equipment to be installed, including surface treatments and any
means of enclosure, designed in accordance with the provisions of BS5696 (Play
Equipment Intended for Permanent Installation Outdoors);
iv) Proposals for the timing of the implementation of the play area(s) in relation to the phasing
of the development;
v) A maintenance schedule for communal open spaces and equipped play areas in
accordance with the provisions of BS5696 including details of on-going inspection,
recording and procedures for detailing with defects. 
The communal open space and equipped play area(s) shall be provided in accordance with
the duly approved details and shall be retained and maintained to the specified standards
thereafter. 
Reason: In order to secure provision of communal open space and equipped play areas within
the development in accordance with the minimum standards set out in the Development Plan. 
15. PPP – Core Path 
Pursuant to Condition 1 – no development shall commence until details for the provision of the
Core Path through the development site has been submitted to and approved by the Planning
Authority in consultation with the Access Officer. 
The details shall comprise: 
i) The route a minimum width of 2.5 metres wide;
ii) The route finished in a tarmacadam surface;
iii) The route provided with dropped kerbs where it meets the road surface;
iv) Gradients kept to a minimum to ensure the route is accessible for people of all abilities. 
The route shall be provided in accordance with the duly approved details and maintained to the
specified standards thereafter. 
Reason:  In order to secure the retention of the existing core path in the interests of amenity 
Note to Applicant: 
The advice contained in the consultation response from the Council’s Access Officer in relation
to application 18/02720/PPP, available to view via the Public Access section of the Council’s
website, should be fully considered in the preparation of the details for the provision of the
Core Path within the development. 
(Reference: Report by Head of Development and Economic Growth dated 8 December
2023, submitted)

Page 21

7. THE SCOTTISH GOVERNMENT ON BEHALF OF BLARGHOUR WIND FARM
LIMITED: ELECTRICITY ACT SECTION 36C AND ELECTRICITY GENERATING
STATIONS (APPLICATIONS FOR VARIATION OF CONSENT) (SCOTLAND)
REGULATIONS CONSULTATION FROM THE ENERGY CONSENTS UNIT FOR
PROPOSED VARIATION TO BLARGHOUR WIND FARM (CONSENTED 29
OCTOBER 2021).  THE S36C VARIATION PROPOSES TO VARY THE S36
CONSENT FROM 17 WIND TURBINES, 136.5M IN HEIGHT TO BLADE TIP TO
14 WIND TURBINES, 180M IN HEIGHT TO BLADE TIP: LAND
APPROXIMATELY 7KM NORTH WEST OF INVERARAY AND 4.5KM SOUTH OF
PORTSONACHAN (REF: 23/00537/S36) 
The Senior Planning Officer spoke to the terms of the report and to supplementary report
number 1 which provided further comment from the Applicant in relation to ornithology.   
Consideration was given to a recommended response to the Scottish Government’s
Energy Consents and Deployment Unit consultation on the Section 36C Variation
Application to the Section 36 consent granted on 29 October 2021 to construct and
operate Blarghour Wind Farm. 
The reports presented reviewed the policy considerations which were relevant to this
proposal and the planning merits of the development, the views of bodies consulted by the
Scottish Government, along with other consultations undertaken by the Council, and third
party opinion expressed to the Scottish Government following publicity of the application
by them. 
It was recommended that the Energy Consents Unit be notified that the Council does not
object to this Section 36C consultation subject to conditions detailed in supplementary
report number 1. 
Motion 
To agree to the recommendation in the report. 
Moved by Councillor Gordon Blair, seconded by Councillor John Armour. 
Amendment 
That the Committee agree - 
1. to the recommendation in the report; and 
2. to request that Officers ensure that concerns expressed by Members during this
meeting are passed on to the Energy Consents Unit. 
Moved by Councillor Kieron Green, seconded by Councillor Mark Irvine. 
A vote was taken by calling the roll. 
Motion    Amendment 
Councillor Armour   Councillor Brown
Councillor Blair   Councillor Green
Councillor Kennedy   Councillor A Hampsey

Page 22

Councillor D Hampsey     
Councillor Hardie     
Councillor Irvine     
Councillor McCabe     
Councillor Martin     
Councillor Philand     
Councillor Wallace 
The Amendment was carried by 10 votes to 3 and the Committee resolved according. 
Decision 
The Committee agreed:- 
1. that the Energy Consents Unit be notified accordingly that: 
• Argyll and Bute Council DOES NOT OBJECT to this application, subject to the
inclusion of the conditions recommended by consultees in any consent granted by
the ECU. These should also include the condition proposed by the Applicant to
allow the lighting scheme to be revisited in the future to take account of emerging
technological solutions which would reduce the impacts of visible lighting, such as
transponder radar activated lighting; and 
2. to request that Officers that ensure that concerns expressed by Members during this
meeting are passed on to the Energy Consents Unit. 
(Reference: Report by Head of Development and Economic Growth dated 20 December
2023 and supplementary report number 1 dated 19 December 2023, submitted) 
The Chair ruled, and the Committee agreed, to take a short break at this point. 
The Committee reconvened at 1.15 pm with all those present as per the sederunt with the
exception of Councillor Paul Kennedy and Councillor Luna Martin. 
8. MR THOMAS IRWIN: FORMATION OF EARTHBANK SLURRY LAGOON AND
ASSOCIATED WORKS: LAND AT WEST DRUMLEMBLE FARM, WEST OF
ROWAN TREE COTTAGE, DRUMLEMBLE, CAMPBELTOWN (REF:
23/01018/PP) 
Before proceeding with his presentation the Area Team Leader advised of a late
representation received from Mr Tommy Millar, who had previously submitted an objection
to this application.   It was the view of Officers that the matters raised had been addressed
in the report of handing which had been before the Members at their meeting in November
2023. 
The Area Team Leader then spoke to the terms of supplementary report number 1 which
provided Members with an update following their decision on 22 November 2023 to
continue the application in order to allow submission of further information from the
Applicant.  The Applicant submitted the requested information which included: a health
and safety management plan for the site; revised site plan with tyre ladder details; revised
cross-section plan; revised security steel mesh fence details to include 2 strands of
barbed wire at the top and bottom; and Health and Safety Executive information sheet on
managing slurry on farms.

Page 23

It was recommended that planning permission be granted subject to the revised list of
conditions and reasons detailed in supplementary report number 1. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 19.05.2023 supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title.  Plan Ref. No.  Version  Date Received 
Location Plans/Site Layout Plans  PL-001  A  30.05.2023 
Proposed Site Layout Plan  PL-002   D 06.12.2023 
Security Fence Details  PL-004  A 06.12.2023 
Cross Sections through proposed
slurry lagoon 
PL-003  C 06.12.2023 
Topographic Survey   01    22.09.2023 
Odour Management Plan       22.09.2023 
Health and Safety Management Plan   06.12.2023 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. Notwithstanding the effect of Condition 1, the developer shall secure the
implementation of an archaeological watching brief, to be carried out by an
archaeological organisation acceptable to the Planning Authority, during all ground
disturbance. The retained archaeological organisation shall be afforded access at all
reasonable times and allowed to record, recover and report items of interest and finds.
A method statement for the watching brief will be submitted by the applicant, agreed by
the West of Scotland Archaeology Service, and approved by the Planning Authority
prior to commencement of the watching brief. The name of the archaeological
organisation retained by the developer shall be given to the Planning Authority and to
the West of Scotland Archaeology Service in writing not less than 14 days before
development commences. 
Reason: In order to protect archaeological resources.   
3. Notwithstanding the effect of Condition 1, upon completion of works the development
hereby approved shall not be brought into use until the applicant has submitted to the

Page 24

planning authority written confirmation from SEPA to confirm that the proposed
development complies with the relevant provisions of The Water Environment
(Controlled Activities)(Scotland) Regulations 2011 (as amended).    
Reason:  In order to safeguard amenity and the environment. 
4. No development shall commence until a scheme of boundary treatment, surface
treatment and landscaping has been submitted to and approved in writing by the
Planning Authority. The scheme shall include details of: 
i) Any proposed re-contouring of the site by means of existing and proposed
ground levels; 
ii) Proposed hard and soft landscape works; 
iii) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits
will be maintained for the lifetime of the development. 
The development shall not be operated until such time as the surface treatment and
any re-contouring works have been completed in accordance with the duly approved
scheme. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme during the first planting season following the commencement of the
development, unless otherwise agreed in writing by the Planning Authority. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity, and to comply with the requirements of NPF4 Policy 3. 
5. The proposed development hereby approved shall be operated in accordance with the
submitted Odour Management Plan dated September 2023, unless otherwise agreed
in writing by the planning authority. 
Reason: In the interests of amenity and safety. 
6. Notwithstanding the effect of Condition 1, the proposed safety signage shall be
installed on all elevations of the fences and on all access gates to the site including on
the two security fence gates as recommended on the revised site layout plan with
drawing no. PL-002  Rev D. Thereafter the signage shall be maintained to ensure that
it remains legible. 
Reason: In the interests of safety. 
7. The development hereby approved shall be operated in accordance with the submitted
Health and Safety Management Plan submitted to the Planning Authority on 06
December 2023, unless otherwise agreed in writing by the planning authority; or as
may otherwise be alternatively instructed by any other Agency with a statutory remit
limiting the operation or maintenance of the site, including the Health and Safety
Executive and/or SEPA. 
Reason: In the interests of amenity and safety.

Page 25

(Reference: Report by Head of Development and Economic Growth dated 10 November
2023 and Supplementary Report Number 1 dated 8 December 2023, submitted) 
Councillor Luna Martin returned to the meeting during consideration of the foregoing item. 
9. BEAM SUNTORY LTD: PROPOSAL OF APPLICATION NOTICE FOR
HARVESTING OF PEAT MOSS FOR USE IN MALT WHISKY PRODUCTION
AND RESTORATION OF PREVIOUSLY DRAINED SITES: GLENMACHRIE
PEAT MOSS, PORT ELLEN, ISLE OF ISLAY (REF: 23/01984/PAN) 
The Senior Planning Officer spoke to the terms of the report.  The proposed peat
extraction area is located to the south of the settlements of Glenmachrie and Glenegedale
on the western side of the Isle of Islay.  The site area consists of open peat mossland and
is partly dissected by the A846 which runs north to south. The site contains four bodies of
water, three to the eastern side of the A846 and another on the western side. 
In terms of the adopted Local Development Plan (2015), the site is located within a
Countryside Zone and borders some areas of the Rural Opportunity Zone to the south. To
the north of the site is Loch Eighinn which is a designated Local Nature Conservation Site. 
The Laggan Bay coastal areas some 0.5km to the west of the proposed site are also
designated as Special Protection Areas (SPA) and SSSI. The site is also subject to the
following constraints: Surface and Riparian Flooding (REF: SEPA Flood Maps) (Parts of
the site appear to be within 1:200 riparian flooding zones), Deep Peat and Safeguarding
Zone 15 - Islay Airport (HIAL).   
The PAN describes the proposed development as “the harvesting of peat for use in the
production of malt whisky in a manner that causes the least environmental impact,
together with restoration of previously drained and worked areas within the site”. 
The report sets out the information submitted to date as part of the PAN and summarises
the policy considerations, against which any future planning application will be considered
as well as potential material considerations and key issues based upon the information
received to date.   
It was recommended that Members note the content of the report and submissions and
provide such feedback as they consider appropriate in respect of the PAN to allow these
matters to be considered by the Applicant in finalising any future planning application
submission. 
Decision 
The Committee noted the content of the report and requested that a step by step guidance
note outlining the technical aspects of the extraction and restoration process alongside
information on supply and demand of peat be submitted with the Planning Application. 
(Reference: Report by Head of Development and Economic Growth dated 1 December
2023, submitted)

Page 26

10. ARDALLA ESTATES LTD: PROPOSAL OF APPLICATION NOTICE FOR
HARVESTING OF PEAT MOSS FOR USE IN MALT WHISKY PRODUCTION
AND RESTORATION OF PREVIOUSLY DRAINED SITES: BALLIVICAR PEAT
MOSS, PORT ELLEN, ISLE OF ISLAY (REF: 23/01985/PAN) 
The Senior Planning Officer spoke to the terms of the report.  The proposed peat
extraction area is located to the immediate north of Port Ellen and bound to the east by
the A846. The irregular shaped site extends approximately 3 kilometres to the north
before extending eastwards into the southeastern quarter of Loch Nan Gabhar and
eastwards again to the track serving to Kintra Farm. 
In term of the current adopted Local Development Plan (2015), the site is located within a
designated Countryside Area, with some pockets of Rural Opportunity Area contained
within it. The site is located approximately 1km to the west of the Laggan Bay Special
Protection Area and SSSI. Port Ellen to the south of the site is designated as a main
settlement area and contains the main town centre and Established Business and Industry
Area. The site is also subject to the following known constraints: Surface and Riparian
Flooding (REF: SEPA Flood Maps) (Parts of the site appear to be within 1:200 riparian
flooding zones); Deep Peat (Dystrophic Blanket Peat Av depth 5.7m);
and Safeguarding Zone 15 - Islay Airport (HIAL). 
The PAN describes the proposed development as “the harvesting of peat for use in the
production of malt whisky in a manner that causes the least environmental impact,
together with restoration of previously drained and worked areas within the site”. 
The report sets out the information submitted to date as part of the PAN and summarises
the policy considerations, against which any future planning application will be considered
as well as potential material considerations and key issues based upon the information
received to date.   
It was recommended that Members note the content of the report and submissions and
provide such feedback as they consider appropriate in respect of the PAN to allow these
matters to be considered by the Applicant in finalising any future planning application
submission. 
Decision 
The Committee noted the content of the report and requested that a step by step guidance
note outlining the technical aspects of the extraction and restoration process alongside
information on supply and demand of peat be submitted with the Planning Application. 
(Reference: Report by Head of Development and Economic Growth dated 1 December
2023, submitted) 
11. DEVELOPMENT MANAGEMENT PERFORMANCE UPDATE - FQ2 2023/24 
A report providing an update on the performance of the Development Management
Service for the reporting period FQ2 2023/24 was considered. 
Decision 
The Committee agreed to note the content of the report.

Page 27

(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 7 December 2023, submitted) 
12. PLANNING PERFORMANCE FRAMEWORK 2022/23 
A report containing recent feedback form the Scottish Government in relation to the
Council’s Planning Performance Framework (PPF) for 2022/23 was considered. 
Decision 
The Committee agreed to note the content of the report and publicise the positive
feedback from the Scottish Government. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 8 December 2023, submitted) 
13. UPDATE ON RECENT SCOTTISH GOVERNMENT PLANNING APPEAL
DECISIONS 
A report summarising recent decisions by Scottish Minsters in respect of planning
application reference 19/01858/PP called in for determination, and the outcome of an
appeal against refusal of an application for listed building consent reference 22/01847/LIB,
was before the Committee for information. 
Decision 
The Committee noted the contents of the report. 
(Reference: Report by Head of Development and Economic Growth dated 20 December
2023, submitted) 
14. CIVIC GOVERNMENT (SCOTLAND) ACT 1982: TAXI AND PRIVATE HIRE CAR
SURVEY 
A report updating Members on the timescale for submitting the taxi survey report was
before the Committee for information. 
Decision 
The Committee noted the updated position. 
(Reference: Report by Executive Director with responsibility for Legal and Regulatory
Support dated 20 December 2023, submitted)