North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref EK/KS Date 24/05/23 
Revenue Monitoring Report Council Summary
1 April 2022 to 3 March 2023 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail kempe@northlan.gov.uk Telephone  01698 302408 
Executive Summary
This report updates the Finance and Resources Committee on the overall position for the
General Fund Account, Housing Revenue Account and Adult Health and Social Care, for
the financial year to 31 March 2023.  The report consolidates the budget monitoring position
of all Services, highlighting and explaining major variances as per the Council’s approved
Financial Regulations. 
The Council approved its General Fund Revenue Budget on 17 February 2022.  Following
notification from Scottish Government of further funding made available to local authorities
and the reallocation of Scottish Child Payments Grant as Agency managed grants the
budget has been revised to £889.122m. 
The Council is currently projecting a surplus of £22.350m which will be available to support
future budget pressures, resulting in a reported break-even position.  It should be noted
that this position reflects a net £4.993m overspend attributable to inflationary pressures
experienced across services. Resources totalling £10.147m have been provided through
a combination of corporate budgetary provision and use of reserves to help manage these
increased costs, which offset the forecast overspends, leaving a balance of £5.154m to
support any further pressures not yet realised.  However, services are required to continue
to take action to help manage the overall position, including managing vacancies and
curtailing non-essential expenditure. 
The 2022/23 budget incorporates £10.484m of net savings with resources of £3.372m set
aside to manage the impact of delayed implementation, reducing the current year target to
£7.112m.  It is projected that £5.225m of the current year target (73%) will be delivered
within the financial year, with replacement savings identified to fully address the shortfall.
Recommendations
It is recommended that the Finance and Resources Committee:
(1) Acknowledge the financial position of the 2022/23 revenue budget; and
(2) Otherwise endorse the contents of this report. 
The Plan for North Lanarkshire
Priority  All priorities

Page 2

1. Background  
1.1. The Council’s approved Financial Regulations require services to remain within their
approved budgetary provision, and to report all significant deviations - defined as the
higher of £100,000 or 5% - within their budget monitoring reports.  Where significant
deviations are identified, services must provide explanatory commentary, outline the
action required to rectify such deviations and where relevant, must also highlight the
impact this has on other budget headings. 
2. Report 
2.1 Summary of General Fund Financial Position
2.1.1. At its meeting of 17 February 2022, the Council approved a General Fund Revenue
Budget of £887.270m.  This included spend which is offset by ring fenced grants of
£50.126m resulting in an opening budget position for Net Service Expenditure of
£837.144m.  Additional funding has since been confirmed as part of the Scottish
Government budget setting, including additional directed funding for Adult Social Care,
Free School Meal Expansion monies, Local Heat and Energy Efficiency Strategy
funding and additional DHP funding, offset by a reallocation of Scottish Child Payments
Grant to agency managed grants, resulting in an overall total budget of £889.122m. 
2.1.2. Following the budget setting in February the Council has an approved savings target
£10.484m for 2022/23. However, £2.000m of one-off resources have been set aside
from General Fund reserves to manage the financial impact of the delayed
implementation of the Active and Creative Communities saving of £3.058m, and
£1.372m has been earmarked from the IJB reserves in respect of the delayed closure
of the Muirpark facility.  These actions reduce the overall savings requirement in
2022/23 to £7.112m.  Further detail can be found in Section 2.3 below. 
2.1.3. The following table summarises the projected income and expenditure position which
illustrates a projected surplus of £22.350m available for future budget pressures: 
Annual 
Budget
(£m)
Projected
Outturn
(£m)
P12
Variance
(£m)
P10
Variance
(£m)
P10 to P12
Movement
(£m)
Expenditure
Total Expenditure   889.122   866.772  22.350  11.937  10.413
Income     
Aggregate External Finance   725.072   725.072 - - -
Local Tax Collection   158.050   158.050 - - -
Use of Balance   6.000   6.000 - - -
Total Income   889.122   889.122 - - -
Projected variance: (Surplus)/Deficit at
31 March 2023 -   (22.350)   22.350   11.937 10.413
Earmarked for future budget pressures -   22.350  (22.350) (11.937)  (10.413)
Surplus/(Deficit) at 31 March 2023 Post
Reserve Allocation - -                 -  -   -
Table 1 
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning

Page 3

2.2.  Analysis of Significant Variations 
2.2.1. Table 2 below analyses the projected outturn financial position across services:
Service P12 Outturn
(£m)
P10 Outturn
(£m)
P10 to P12
Movement 
(£m)
Education Children and Families (2.613) Overspend (3.563) Overspend 0.950
Enterprise and Communities (2.379) Overspend (3.341) Overspend 0.962
Chief Executives and Other
Corporate Services 4.963 Underspend     1.171 Underspend 3.792
Social Work (Non-Integrated) - On Budget - On Budget -
Executive Services Total (0.029) Overspend (5.733) Overspend 5.704
Financing Costs 11.057 Underspend 7.000 Underspend 4.057
Budget Assumptions  9.256 Underspend    8.066 Underspend 1.190
Use of Reserves (inflation) 2.066 Over Recovery 2.604 Over Recovery (0.538)
Total Projected Surplus/(Deficit) 22.350 Underspend 11.937 Underspend 6.052
Earmarked for future budget
pressures (22.350) Overspend (11.937) Overspend (10.413)
Total  0.000 On Budget 0.000    On Budget 0.000
Table 2 
2.2.2. Education, Children and Families is reporting a projected overspend of £2.613m, which
is £0.950m less than previously reported, mainly as a result of an increased
underspend in employee costs.  The overall position is largely due to a projected
overspend in property costs of £5.646m due to anticipated increased utilities/energy
costs arising from inflationary pressures (£5.293m) and other overspends (£0.353m),
a projected overspend in transport costs of £5.490m largely due to ongoing demand
pressures within ASN transport (£2.678m) and increased mainstream transport
contract rates (£2.861m). There is also a projected increase in cost for ASN placements
£0.652m and family placements £0.448m associated with external fostering and kinship
care, and a projected under recovery in income of £1.282m due to reduced
membership and visitor fees for Active and Creative Communities. These are partially
offset by a projected reduction in employee costs of £7.664m, largely due to delays in
recruitment and establishment of staffing models, an anticipated underspend of
£0.433m in relation to children’s support services and clothing grants, projected
underspends in other expenditure of £0.826m, supplies and services of £1.925m and
administration costs of £0.102m, predominately due to management action and
curtailment of non-essential expenditure.

Page 4

2.2.3. Enterprise and Communities is projecting an overspend of £2.379m, which is £0.962m
less than previously reported, mainly as a result of an increased underspend in
employee costs. The overall reported position is largely due to inflationary pressures of
£2.625m in relation to the cost of utilities, food, fuel, materials and waste tonnage, offset
by an overall non-inflationary underspend across a number of budgeted areas of
£0.246m.  There are forecast increased costs of £5.043m mainly due to delay in the
achievement of office rationalisation savings (£0.667m), increased use of agency staff
to support waste collection due to ongoing recruitment difficulties (£0.485), increased
vehicle leasing and hire costs (£0.638m) and vehicle parts (£0.119m), increase in costs
in charging of electric vehicles (£0.600m), an overspend in the in essential repairs and
road projects (£0.492m), an overspend in consultancy costs (£0.819m) and payments
to other bodies (£0.247m), and a number of other expenditure cost pressures
(£0.976m). These overspends are offset by a £3.791m underspend in employee costs
due to vacancies across the services and an over recovery in income of £1.498m in
relation to Planning fee income (£0.484m), Building Warrants (£0.496m), road
occupation and construction consents (£0.298m) and other chargeable fees. 
2.2.4. Chief Executives and Other Corporate Services are projecting an underspend of
£4.963m, which is a £3.792m increase on the previously reported position, largely
relating to an increased over recovery of income (£1.885m), a further reduction in
forecast cloud consumption costs (£0.870m) and an increased underspend in
employee costs (£0.981m). The overall reported position is primarily due to lower than
budgeted contract costs as a result of a delay in transferring to a cloud environment,
resulting in an underspend in forecast cloud consumption costs by £2.117m, an over
recovery in income of £1.334m largely in relation to PPP contributions (volume discount
MEARS) and Rent Allowance/Rebate recovery, offset by an under recovery in income
in the areas of licencing (liquor and taxi) and internal recharges, an underspend in
employee costs of £1.383m mainly due to vacancies savings. 
2.2.5. There is an underspend in Financing costs of £11.057m due to prudent management
of the Council’s borrowing and cashflow position, as well as the latest forecast
expenditure on the capital programme, and an over recovery in respect of interest
earned on revenue balances due to higher than budgeted interest rates.  This is an
increased underspend of £4.057m from the previously reported position due to a net
increase on interest on revenue balances (£2.092m) and an increased reduction in loan
charge costs (£1.965m).  In addition, members continue to be advised that
consideration is currently being given to the implementation of the option of a loan debt
holiday, which is one of the fiscal flexibilities introduced by the Scottish Government,
initially to support the cost of COVID.  If implemented this will generate a further one-
off saving in 2022/23.  However, it should be noted that this does not change the overall
debt to be repaid and any benefit generated will need to be repaid within the shorter of
either the remaining period of the loans fund advance or twenty years. The decision on
this will be reviewed as part of the year end closedown. 
2.2.6. Within the services’ financial positions shown above, inflationary pressures totalling
£11.419m are reported.  However, Corporate resources totalling £10.147m have been
provided through a combination of budgetary provision and use of reserves to help
manage the increased costs arising from higher inflation rates.  A total of £6.426m of
these pressures are being managed within the services budgets, resulting in a £4.993m
draw on corporate resources to manage the position overall.  Therefore, there is a
balance of £5.154m remaining to support any further pressures not yet realised.
However, given the current economic volatility, government policy announcements and
market conditions, it is very difficult to accurately assess the impact of inflation across
the Council. Therefore, whilst the Council has identified funds to assist with offsetting
the impact of inflation within the current year, it continues to be vitally important that

Page 5

services curtail all non-essential expenditure to support the Council’s overall
management of this significant risk. 
2.2.7. An underlying reported underspend of £9.256m is also reported within budget
assumptions, which reflects the release of resources held in relation to budget
assumptions now not anticipated to be realised.  This includes resources held for
inflation noted in 2.2.6 above along with a £1.411m underspend in relation to the
reversal of the social care levy (increased employer national insurance contributions)
from November 2022, and £1.847m saving in relation to the teacher strike action (24
Nov/ 7 Dec/ 10, 11 & 19 Jan). 
2.2.8. It should also be noted that as at period 12 the Council Tax Product remains under
review.  This includes consideration of Council Tax collection, Council Tax Reduction
Scheme up take and household numbers.  In addition, the Council Tax Product will
then be assessed for Expected Credit losses as part of the year end process.  It is
currently anticipated there will be no material variance overall. 
2.2.9. In addition, Scottish Government provided additional £7.726m of Capital Grant that can
be used flexibly to support the cost of the 2022/23 Pay Award agreement.  The
application of this flexibility will result in a transfer of surplus from HRA as part of the
year end close down.  This will partly offset the cost incurred for pay in 2022/23, along
with other existing General Fund budgets. 
2.3. 2022/23 Budget Savings
2.3.1. As outlined in paragraph 2.1.2 above, the Council has approved net savings of
£10.484m for 2022/23.  After taking account of the £3.372m one-off resources set aside
to manage the delayed implementation of savings, the overall savings target is
£7.112m.  Each Service reports on the achievement of their savings within the relevant
Services’ monitoring report.  It is projected that £5.225m of savings (73%) will be
achieved in the current year.  It is anticipated that the remaining in year gap of £1.887m
will be fully mitigated by replacement savings and implemented in full in future years. 
2.4. Earmarked Reserves and Change Management Fund
2.4.1. The Council’s audited annual accounts highlight a General Fund reserve balance of
£236.264m.  This balance includes £8.000m for the Contingency Reserve.  There is
also a total of £170.444m earmarked for specific future commitments including
£31.054m in relation to COVID and £54.175m to support the future contractual
obligations in respect of PPP schools, following a change in presentation in respect of
such balances, as discussed and agreed with Audit Scotland.  A further £29.424m has
been allocated to the Change Management Fund to support future budget pressures,
one-off costs of existing approved savings and to ensure the Council has a resilient
and sustainable strategic financial plan. This leaves £28.396m of unallocated balances. 
2.4.2. A total of £103.122m of earmarked reserves are profiled for use in 2022/23 with a
further £67.332m profiled for use in future years. It is currently projected that £84.696m
of the 2022/23 earmarked reserves will be spent during this financial year with
£17.397m anticipated to be required in future years and reserves of £1.029m deemed
no longer required. A summary position in respect of the above is shown in Appendix
2.   
2.4.3. The unallocated reserves will change depending on overall financial performance year
on year, unexpected commitments and to account for future drawdowns from the
capital fund. Therefore, reflecting the current year forecast position, commitments
during the year of £0.819m, earmarked reserves no longer required of £1.029m and

Page 6

the capital fund drawdown of £0.396m, the unallocated General Fund balance is
currently forecast to reach £30.360m by the financial year end.  Appendix 3
summarises this position.  However, it should also be noted that the overall reported
position reflects assumptions around approval to earmark additional funds as part of
the year-end review arrangements. 
2.5. Risks and Uncertainty
2.5.1. All activities undertaken by the Council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy, Services manage these as part of their
overall corporate and service planning processes.  The current economic climate such
as the rising forecast of pay and non-pay inflation, on-going COVID impact, the cost of
living crisis and other external factors, have the potential to impact upon the Council’s
ability to provide quality services within approved budget levels. 
2.6. Housing Revenue Account
2.6.1. The Housing Revenue Account is currently projecting an underspend of £1.067m for
the financial year. This is due to the following variations against budget. There is an
underspend in employee costs of £1.400m largely due to vacancy savings in
conjunction with the reversal to increased national insurance rates, an underspend in
financing costs of £1.634m due to proactive treasury management activity, an
anticipated underspend in expenditure relating to ambitions funding of £1.107m and a
smaller underspend within administrative costs of £0.180m. These are offset by an
overspend in property costs of £2.607m mainly in relation to an increase in repairs and
utilities costs, an under recovery of income of £0.647m relating to rental income,
laundry, and court fees. 
2.7. Adult Health and Social Care
2.7.1. Council Adult Health and Social Care provision to the Integration Joint Board (IJB) is
projecting an underspend of £9.327m. This position is primarily due to a projected
underspend in employee cost of £4.735m as a result of slippage in recruitment of posts
relating to “Winter Planning and Enhanced Support”, a projected under spend in
payments to other bodies of £3.130m as a result of staff shortages within the care at
home sector SDS commissioning framework, a projected underspend in administration
costs of £1.940m due to lower than anticipated Carers costs offset by an overspend in
Supplies and Services of £0.782m due to higher than anticipated costs in the areas of
Equipment and Adaptation services, uniforms and protective clothing and several other
smaller compensating budget movements.     
3.  Measures of success 
3.1. The Council continues to operate within approved budgeted resources.   
4. Supporting documents
Appendix 1 Summary by Division
Appendix 2 Anticipated Commitments – Earmarked Reserves
Appendix 3 Availability of One-Off Funds – Change Management Fund 
Elaine Kemp
Chief Officer (Finance)

Page 7

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☒
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?

Page 8

Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
5.10  Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes  ☐  No  ☐ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the Armed
Forces community to make sure that they do not face disadvantage compared to
other citizens in the provision of public services.

Page 9

LINE SERVICE  ACCOUNT BUDGET ACTUAL VARIANCE ANNUAL PROJECTED
NO. TO DATE TO DATE TO DATE BUDGET OUTTURN
(1) (2) (3) (4) (5) (6) (7)
£      £      £ £      £      £     
1 Education & Families 369,831,571    371,098,440    (1,266,869 )      466,619,888                 469,232,577                (2,612,689 )                
2 Early Years 31,110,808      31,110,808      -                     31,920,353                   31,920,353                  -                              
3 Primary Schools 123,260,986    123,260,986    -                     137,042,002                 137,042,002                -                              
4 Secondary Schools 120,361,343    120,361,343    -                     128,673,940                 128,673,940                -                              
5 Special Schools 18,768,485      18,768,485      -                     20,762,878                   20,762,878                  -                              
6 Education & Families Service Delivery 19,764,164      20,357,849      (593,685 )         73,536,780                   75,191,566                  (1,654,786 )                
7 Childrens Services Social Work 34,548,073      34,539,828      8,245              38,918,528                   38,898,332                  20,196                     
8 Justice Services 19,551            (143,498 )         163,049          73,431                         (122,883 )                     196,314                    
9 Active and Creative Communities 8,819,026       9,920,766       (1,101,740 )      25,037,035                   26,567,127                  (1,530,092 )                
10 Employability 6,831,349       6,789,772       41,577            3,906,759                    3,864,032                   42,727                     
11 Community Learning 4,074,867       3,861,356       213,511          4,765,748                    4,457,875                   307,873                    
12 Welfare 2,272,919       2,270,745       2,174              1,982,434                    1,977,355                   5,079                       
13 Strategy for Young People -                     -                     -                     -                                  -                                 -                              
14 Enterprise & Communities 119,940,440    118,864,981    1,075,459       144,395,656                 146,775,214                (2,379,558 )                
15 Environmental Assets 30,942,888      31,295,083      (352,195 )         47,197,455                   47,037,677                  159,778                    
16 Regulatory Services & Waste Solutions 30,733,429      33,112,775      (2,379,346 )      37,123,707                   38,904,984                  (1,781,277 )                
17 Assets & Procurement 40,500,583      39,284,305      1,216,278       38,298,520                   40,170,814                  (1,872,294 )                
18 Planning & Regeneration 5,167,223       3,480,069       1,687,154       9,545,283                    8,391,185                   1,154,098                 
20 Housing Solutions 6,089,044       5,261,520       827,524          5,330,715                    5,069,488                   261,227                    
22 Business, Housing Property & Projects 7,258,980       7,071,096       187,884          7,495,518                    7,796,608                   (301,090 )                   
23 Trading Accounts (751,707 )         (639,867 )         (111,840 )         (595,542 )                      (595,542 )                     -                              
24 Chief Executives & Other Corporate Services 67,212,259      64,385,276      2,826,983       98,482,701                   93,519,535                  4,963,166                 
25 Directorate & Support 763,688          745,422          18,266            874,841                       846,630                      28,211                     
26 Fiancial Solutions 20,199,393      19,998,965      200,428          46,397,878                   45,545,357                  852,521                    
27 Audit & Risk 512,789          489,153          23,636            579,364                       546,727                      32,637                     
28 Legal & Democratic Solutions 2,230,979       2,431,918       (200,939 )         2,155,475                    2,426,881                   (271,406 )                   
29 Business & Digital 15,535,999      13,831,503      1,704,496       17,404,666                   15,537,150                  1,867,516                 
30 People & Organisational Development 7,744,173       7,319,123       425,050          8,142,731                    7,688,558                   454,173                    
31 Strategic Communication 5,144,888       4,871,802       273,086          5,156,219                    4,874,607                   281,612                    
32 Other Corporate Services 2,649,861       2,266,901       382,960          3,684,556                    1,966,654                   1,717,902                 
33 Joint Boards 12,430,489      12,430,489      -                     14,086,971                   14,086,971                  -                              
34 Social Work (non Integrated) 187,964,805    187,964,805    -                     188,700,126                 188,700,126                -                               
35 GENERAL FUND SERVICES 744,949,075    742,313,502    2,635,573       898,198,371                 898,227,452                (29,081 )                    
36 FINANCING COSTS 20,692,563      10,486,437      10,206,126      (40,569,875 )                  (51,626,511 )                 11,056,636               
37 Reversal of Capital Charge (67,430,807 )     (67,430,807 )     -                     (73,050,041 )                  (73,050,041 )                 -                              
38 Loan Charges and Interest on Revenue Balances 29,981,692      19,775,566      10,206,126      32,480,166                   21,423,530                  11,056,636               
39 OTHER BUDGETARY ISSUES 29,070,839      29,070,839      -                     31,493,409                   20,171,000                  11,322,409               
40 Assumptions not yet Realised 29,070,839      29,070,839      -                     31,493,409                   22,237,000                  9,256,409                 
41 Drawdown from Reserves -                     -                     -                     -                                  (2,066,000 )                  2,066,000                 
42 TOTAL EXPENDITURE 794,712,477    781,870,778    12,841,699      889,121,905                 866,771,941                22,349,964               
43 SOURCES OF FUNDING 820,727,912    820,727,912    -                     889,121,905                 889,121,905                -                              
44 Aggregate External Finance 669,297,637    669,297,637    -                     725,072,440                 725,072,440                -                              
45 Council Tax 145,891,814    145,891,814    -                     158,049,465                 158,049,465                -                              
46 Use of balances 5,538,462       5,538,462       6,000,000                    6,000,000                  
47 (SURPLUS) / DEFICIT (26,015,435 )     (38,857,134 )     (12,841,699 )     -                                  (22,349,964 )                 22,349,964               
48 Earmarked for Future Budget Pressures -                     -                     -                     -                                  22,349,964                  (22,349,964 )              
49 (SURPLUS) / DEFICIT (26,015,435 )     (38,857,134 )     (12,841,699 )     -                                  -                                 -                              
50 HOUSING REVENUE ACCOUNT (SURPLUS) / DEFICIT (33,116,747 )     (33,363,585 )     246,838          -                                  (1,067,000 )                  1,067,000                 
51 ADULT HEALTH AND SOCIAL CARE (SURPLUS) /DEFICIT (17,393,115 )     (26,003,049 )     8,609,934       -                                  (9,327,429 )                  9,327,429                 
NORTH  LANARKSHIRE COUNCIL
SUMMARY BY DIVISION FOR PERIOD ENDING 3 March 2023 (PERIOD 12)
PROVISIONAL
VARIANCES

Page 10

No embedded text on this page.

Page 11

Appendix 3
£000 £000
Total Balance B/f per 2021/22 Annual Accounts 29,424 29,755
Approved commitments (819)
29,424 28,936
Period 10 reported variance 0
Earmarked Reserves no longer required 1,029
Total Balance 2022/23 before commitments 29,424 29,965
Known Commitments :- Revised one - off costs of approved savings (1,624)
Draw down from Capital Fund 396
Total Balance 2022/23 27,800 30,361
Estimated future Capital Fund Drawdown to 2023/24 1,000
Forecast Balance 27,800 31,361
NORTH  LANARKSHIRE COUNCIL
AVAILABILITY OF GENERAL FUND BALANCES AS AT 3 March 2023 (PERIOD 12)
Change Management
Fund
Unallocated General
Fund