North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref; EK/KS   Date 01/03/23 
Revenue Monitoring Report Council Summary
1 April 2022 to 6 January 2023 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail KempE@northlan.gov.uk Telephone
07939280601 
Executive Summary
This report updates the Finance and Resources Committee on the overall position for the
General Fund Account, Housing Revenue Account and Adult Health and Social Care, for
the financial year to 31 March 2023.  The report consolidates the budget monitoring position
of all Services, highlighting and explaining major variances as per the Council’s approved
Financial Regulations. 
The Council approved its General Fund Revenue Budget on 17 February 2022.  Following
notification from Scottish Government of further funding made available to local authorities
and the reallocation of Scottish Child Payments Grant as Agency managed grants the
budget has been revised to £886.197m. 
The Council is currently projecting a surplus of £11.937m which will be earmarked to
support future budget pressures resulting in break-even position shown against budget.  It
should be noted that this position reflects a net £5.531m overspend attributable to
inflationary pressures experienced across services. However, resources totalling
£10.147m have been provided through a combination of corporate budgetary provision and
use of reserves to help manage these increased costs, which offset the forecast
overspends, leaving a balance of £4.616m to support any further pressures not yet
realised.   It should also be noted that services are required to continue to take action to
help manage the overall position including managing vacancies and curtailing non-
essential expenditure. 
The 2022/23 budget incorporates £10.484m of net savings with resources of £3.372m set
aside to manage the impact of delayed implementation, reducing the current year target to
£7.112m.  It is projected that £5.417m of the current year target (76%) will be delivered
within the financial year, with replacement savings identified to fully address the shortfall.
Recommendations 
It is recommended that the Finance and Resources Committee:
(1) Acknowledge the financial position of the 2022/23 revenue budget; and
(2) Otherwise endorse the contents of this report.

Page 2

1. Background 
1.1. The Council’s approved Financial Regulations require services to remain within their
approved budgetary provision, and to report all significant deviations - defined as the
higher of £100,000 or 5% - within their budget monitoring reports.  Where significant
deviations are identified, services must provide explanatory commentary, outline the
action required to rectify such deviations and where relevant, must also highlight the
impact this has on other budget headings. 
2. Report
2.1 Summary of General Fund Financial Position
2.1.1. At its meeting of 17 February 2022, the Council approved a General Fund Revenue
Budget of £887.270m.  This included spend which is offset by ring fenced grants of
£50.126m resulting in an opening budget position for Net Service Expenditure of
£837.144m.  Additional funding has since been confirmed as part of the Scottish
Government budget setting, including additional directed funding for Adult Social Care,
Free School Meal Expansion monies, Local Heat and Energy Efficiency Strategy
funding and additional DHP funding offset by a reallocation of Scottish Child Payments
Grant to agency managed grants resulting in an overall total budget of £886.197m. 
2.1.2. Following the budget setting in February the Council has an approved savings target
£10.484m for 2022/23. However, £2.000m of one-off resources have been set aside
from General Fund reserves to manage the financial impact of the delayed
implementation of the Active and Creative Communities saving of £3.058m, and
£1.372m has been earmarked from the IJB reserves in respect of the delayed closure
of the Muirpark facility.  These actions reduce the overall savings requirement in
2022/23 to £7.112m.  Further detail can be found in Section 2.3 below. 
2.1.3. The following table summarises the projected income and expenditure position which
illustrates a projected surplus of £11.937m earmarked for future budget pressures: 
Annual 
Budget
(£m)
Projected
Outturn
(£m)
P10
Variance
(£m)
P6 Variance
(£m)
P6 to P10
Movement
(£m)
Expenditure
Total Expenditure   886.197   874.260  11.937  (0.538)    12.475 
Income     
Aggregate External Finance   722.147   722.147 - - -
Local Tax Collection   158.050   158.050 - - -
Use of Balance   6.000   6.000 - - -
Total Income   886.197   886.197 - - -
Projected variance: (Surplus)/Deficit at
31 March 2023 -   (11.937)   11.937           (0.538) 12.475
Earmarked for future budget pressures -   11.937  (11.937) - (11.937) 
Surplus/(Deficit) at 31 March 2023 Post
Reserve Allocation -                  -  (0.538)   0.538
Table 1
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning

Page 3

2.2.  Analysis of Significant Variations 
2.2.1. Table 2 below illustrates the projected outturn financial position of services:
Service P10 Outturn
(£m)
P6 Outturn
(£m)
P6 to P10
Movement 
(£m)
Education Children and Families    (3.563) Overspend (5.144)  Overspend  1.581
Enterprise and Communities    (3.341) Overspend (3.959) Overspend  0.618
Chief Executives and Other
Corporate Services    1.171 Underspend 0.353  Underspend  0.818
Social Work (Non-Integrated) - On Budget -  On Budget -
Executive Services Total   (5.733) Overspend (8.750) Overspend 3.017
Financing Costs   7.000 Underspend - On Budget  7.000
Budget Assumptions    8.066  Underspend 2.927 Underspend  5.139
Use of Reserves (inflation)   2.604 Over Recovery 5.285 Over Recovery (2.681)
Total Projected Surplus/(Deficit)  11.937 Underspend (0.538) Overspend  12.475
Earmarked for future budget
pressures  (11.937) Overspend - On Budget  (11.937)
Total  0.000 On Budget (0.538) Overspend 0.538
Table 2 
2.2.2. Education, Children and Families is reporting a projected overspend of £3.563m.  There
is a projected overspend in property costs of £5.586m largely due to an anticipated
increase in utilities/energy costs due to inflationary pressures (£5.300m) and other
overspends (£0.286m), a projected overspend in transport costs of £5.513m largely
due to ongoing demand pressures within ASN transport (£2.678m) and increases to
mainstream transport contract rates(£2.810m). There is also a projected increase in
payments for ASN placements of £0.329m and Family Placements of £0.579m due to
cost pressures associated with External Fostering and Kinship Care Placements and a
projected under recovery in income of £1.227m due to reduced membership and visitor
fees for Active and Creative Communities. These are partially offset by a projected
reduction in employee costs of £6.914m, largely due to delays in recruitment and
establishment of staffing models, projected underspends in other expenditure of
£0.826m, supplies and services of £1.822m and administration costs of £0.012m
predominately due to management action and curtailment of non-essential
expenditure. 
2.2.3. Enterprise and Communities is projecting an overspend of £3.341m, largely due to
inflationary pressures of £2.625m in relation to utilities, food, fuel, materials and waste
tonnage.  There are also forecast increased non-inflationary related costs of £3.239m

Page 4

mainly due to delay in the achievement of office rationalisation savings (£0.580m),
increased use of agency staff to support waste collection due to ongoing recruitment
difficulties (£0.535), increased requirement in vehicle leasing and hire costs (£0.432m)
and vehicle parts (£0.117m), increase in costs in relation to charging of electric vehicles
(£0.539m), overspend in consultancy costs (£0.253m) and a number of other
expenditure cost pressures (£0.783m). These overspends are partially offset by a
£1.988m underspend in Employee costs due to vacancies across the services, an over
recovery in income of £0.345m and a number of smaller underspends across a number
of budget headings. 
2.2.4. Chief Executives and Other Corporate Services are projecting an underspend of
£1.171m, primarily due to lower than budgeted contract costs as a result of a delay in
transferring to a cloud environment, thus reducing the forecast cloud consumption costs
by £1.248m, an underspend in employee costs of £0.403m in relation to vacancies,
savings and minor savings across a number of other budget headings, as a rest of
management action, offset by a £0.522m under recovery in income in the areas of
licencing (liquor and taxi) and internal recharges such as insurance and printing. 
2.2.5. Prudent management of the Council’s borrowing and cashflow position, as well as
reflecting the latest forecast expenditure on the capital programme, is estimated to
generate a one-off underspend of £7.000m.  In addition, members are advised that
consideration is currently being given to the implementation of the option of a loan debt
holiday, which is one of the fiscal flexibilities introduced by the Scottish Government,
initially to support the cost of COVID.  Further details are outlined in the Treasury
Management Strategy report to this Committee.  If implemented this will generate a
further one-off saving in 2023/24.  However, it should be noted that this does not
change the overall debt to be repaid and any benefit generated will need to be repaid
within the shorter of either the remaining period of the loans fund advance or twenty
years. The decision on this will be reviewed as part of the year end closedown. 
2.2.6. Within the services’ financial positions shown above, unmanaged inflationary
overspends totalling £5.531m have been reported.  However, officers will recall
resources totalling £10.147m have been provided through a combination of budgetary
provision and use of reserves to help manage the increased costs arising from higher
inflation rates.  Therefore, there is an offsetting drawdown of £5.531m from such
resources, leaving a balance of £4.616m to support any further pressures not yet
realised. 
2.2.7. An underlying reported underspend of £8.066m is reported within budget assumptions,
which reflects the release of resources held in relation to budget assumptions now not
anticipated to be realised.  This includes resources held for inflation noted in 2.2.6
above along with £1.411m in relation to the reversal of increased employer national
insurance contributions from November 2022, and £0.657m in relation to the teacher
strike action days (24 November and 7 December). 
2.2.8. The net surplus of £11.937m will be earmarked to support future budget pressures.
Therefore, a breakeven position is reported for 2022/23. 
2.2.9. Given the volatility of the economy, Government policy announcements and market
conditions, it is very difficult to accurately assess the impact of inflation across the
Council. Whilst the Council has identified funds to assist with offsetting the impact of
inflation within the current year, it continues to be vitally important that services curtail
all non-essential expenditure to support the Council’s overall management of this
significant risk in future years.

Page 5

2.3. 2022/23 Budget Savings
2.3.1. As outlined in paragraph 2.1.2 above, the Council has approved net savings of
£10.484m for 2022/23.  After taking account of the £3.372m one-off resources set aside
to manage the delayed implementation of savings, the overall savings target is
£7.112m.  Each Service reports on the achievement of their savings within the relevant
Services’ monitoring report.  It is projected that £5.417m of savings (76%) will be
achieved in the current year.  It is anticipated that the remaining in year gap of £1.694m
will be fully mitigated by replacement savings and implemented in full in future years. 
2.4. Earmarked Reserves and Change Management Fund
2.4.1. The Council’s audited annual accounts highlight a General Fund reserve balance of
£236.264m.  This balance includes £8.000m for the Contingency Reserve.  There is
also a total of £170.444m earmarked for specific future commitments including
£31.054m in relation to COVID and £54.175m to support the future contractual
obligations in respect of PPP schools, following a change in presentation in respect of
such balances, as discussed and agreed with Audit Scotland.  A further £29.424m has
been allocated to the Change Management Fund to support future budget pressures,
one-off costs of existing approved savings and to ensure the Council has a resilient
and sustainable strategic financial plan. This leaves £28.396m of unallocated balances. 
2.4.2. A total of £103.630m of earmarked reserves are profiled for use in 2022/23 with a
further £66.814m profiled for use in future years. It is currently projected that £97.742m
of the 2022/23 earmarked reserves will be spent during this financial year with £4.872m
anticipated to be required in future years and reserves of £1.016m deemed no longer
required. A summary position in respect of the above is shown in Appendix 2. 
2.4.3. The unallocated reserves will change depending on overall financial performance year
on year, unexpected commitments and to account for future drawdowns from the
capital fund. Therefore, reflecting the current year break-even forecast, commitments
during the year of £0.819m, earmarked reserves no longer required of £1.016m and
the capital fund drawdown of £0.396m, the unallocated General Fund balance is
currently forecast to reach £30.347m by the financial year end.  Appendix 3
summarises this position. 
2.5. Risks and Uncertainty
2.5.1. All activities undertaken by the Council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy, Services manage these as part of their
overall corporate and service planning processes.  The current economic climate such
as the rising forecast of pay and non-pay inflation, on-going COVID impact, the cost of
living crisis and other external factors, have the potential to impact upon the Council’s
ability to provide quality services within approved budget levels. 
2.6. Housing Revenue Account
2.6.1. The Housing Revenue Account is currently projecting an underspend of £1.067m for
the financial year. There is an underspend in employee costs of £1.400m largely due
to vacancy savings in conjunction with reversal to increased national insurance rates,
an underspend in financing costs of £1.643m due to proactive treasury management
activity reducing average loans funds interest rates and lower than anticipated capital
expenditure 2021/22 outturn, an anticipated underspend in ambitions funding of
£1.107m and a smaller underspend within Admin Costs of £0.180m. These are largely
offset by an overspend in property costs of £2.607m relating to an increase in repairs
costs (£2.000m), utilities overspends (£0.337m) and other smaller areas of
underspends (£0.270m) coupled with an under recovery of income £0.667m relating to
Rental Income (£0.447m) and Fees and Charges (0.200m).

Page 6

2.7. Adult Health and Social Care
2.7.1. Council Adult Health and Social Care provision to the Integration Joint Board (IJB) is
projecting an underspend of £8.496m. This position is primarily due to a projected
underspend in employee cost of £4.265m as a result of slippage in recruitment of posts
relating to “Winter Planning and Enhanced Support”, a projected under spend in
payments to other bodies of £2.700m as a result of staff shortages within the care at
home sector SDS commissioning framework, a projected underspend in administration
costs of £1.871m due to lower than anticipated Carers costs and several other smaller
budget movements.    
3.  Measures of success 
3.1. The Council continues to operate within approved budgeted resources. 
4. Supporting documents
Appendix 1 Summary by Division
Appendix 2 Anticipated Commitments – Earmarked Reserves
Appendix 3 Availability of One-Off Funds – Change Management Fund 
Elaine Kemp, Chief Officer (Finance) 
5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact

Page 7

Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☒
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
5.10  Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)?

Page 8

Yes  ☐  No  ☐ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the Armed
Forces community to make sure that they do not face disadvantage compared to
other citizens in the provision of public services.

Page 9

LINE SERVICE  ACCOUNT BUDGET ACTUAL VARIANCE ANNUAL PROJECTED
NO. TO DATE TO DATE TO DATE BUDGET OUTTURN
(1) (2) (3) (4) (5) (6) (7)
£      £      £ £      £      £     
1 Education & Families 191,511,868  194,517,243  (3,005,375 )    460,191,888              463,754,745             (3,562,857 )              
2 Early Years 16,357,142    16,357,142    -                   31,807,284                31,807,284               -                            
3 Primary Schools 65,375,458    65,375,458    -                   136,209,480              136,209,480             -                            
4 Secondary Schools 66,087,699    66,087,699    -                   127,846,098              127,846,098             -                            
5 Special Schools 10,092,590    10,092,590    -                   20,651,426                20,651,426               -                            
6 Education & Families Service Delivery 3,815,443      6,521,092      (2,705,649 )    71,465,354                74,275,149               (2,809,795 )              
7 Childrens Services Social Work 17,697,732    17,246,824    450,908        36,567,528                36,278,319               289,209                  
8 Justice Services 641,179        492,748        148,431        73,431                       93,863                      (20,432 )                  
9 Active and Creative Communities 4,391,015      5,212,135      (821,120 )       25,037,035                26,367,925               (1,330,890 )              
10 Employability 3,571,016      3,571,016      -                   3,906,759                  3,876,032                 30,727                   
11 Community Learning 2,126,964      2,119,270      7,694            4,645,059                  4,345,898                 299,161                  
12 Welfare 1,355,630      1,441,269      (85,639 )         1,982,434                  2,003,271                 (20,837 )                  
13 Strategy for Young People -                   -                   -                   -                                -                               -                            
14 Enterprise & Communities 91,756,902    91,020,839    736,063        144,529,656              147,871,215             (3,341,559 )              
15 Environmental Assets 23,747,538    23,765,204    (17,666 )         47,357,455                48,022,576               (665,121 )                
16 Regulatory Services & Waste Solutions 25,097,823    25,649,228    (551,405 )       37,123,707                39,609,856               (2,486,149 )              
17 Assets & Procurement 31,759,645    31,236,648    522,997        38,272,520                39,289,023               (1,016,503 )              
18 Planning & Regeneration 4,496,069      3,966,960      529,109        9,545,283                  8,647,959                 897,324                  
20 Housing Solutions 1,120,851      1,041,532      79,319          5,330,715                  5,364,201                 (33,486 )                  
22 Business, Housing Property & Projects 6,158,968      5,976,608      182,360        7,495,518                  7,533,142                 (37,624 )                  
23 Trading Accounts (623,992 )       (615,341 )       (8,651 )           (595,542 )                    (595,542 )                   -                            
24 Chief Executives & Other Corporate Services 56,651,541    55,678,719    972,822        96,226,467                95,055,325               1,171,142               
25 Directorate & Support 628,972        616,598        12,374          874,841                     852,804                    22,037                   
26 Fiancial Solutions 17,870,165    17,856,054    14,111          45,590,644                45,575,304               15,340                   
27 Audit & Risk 486,399        457,445        28,954          579,364                     545,285                    34,079                   
28 Legal & Democratic Solutions 1,763,058      1,987,391      (224,333 )       2,155,475                  2,394,687                 (239,212 )                
29 Business & Digital 12,766,239    12,216,750    549,489        17,404,666                16,797,175               607,491                  
30 People & Organisational Development 6,874,202      6,687,283      186,919        8,142,731                  7,896,840                 245,891                  
31 Strategic Communication 4,204,093      4,108,424      95,669          5,156,219                  5,025,049                 131,170                  
32 Other Corporate Services 2,566,608      2,256,969      309,639        3,684,556                  3,330,210                 354,346                  
33 Joint Boards 9,491,805      9,491,805      -                   12,637,971                12,637,971               -                            
34 Social Work (non Integrated) 187,964,805  187,964,805  -                   188,700,126              188,700,126             -                             
35 GENERAL FUND SERVICES 527,885,116  529,181,606  (1,296,490 )    889,648,137              895,381,411             (5,733,274 )              
36 FINANCING COSTS 26,021,122    20,636,507    5,384,615      (40,729,875 )               (47,729,875 )              7,000,000               
37 Reversal of Capital Charge (56,192,339 )   (56,192,339 )   -                   (73,050,041 )               (73,050,041 )              -                            
38 Loan Charges 25,438,589    20,053,974    5,384,615      33,070,166                26,070,166               7,000,000               
39 Interest on Revenue Balances (576,923 )       (576,923 )       -                   (750,000 )                    (750,000 )                   -                            
40 OTHER BUDGETARY ISSUES 28,675,898    28,675,898    -                   37,278,667                26,608,258               10,670,409             
41 Assumptions not yet Realised 28,675,898    28,675,898    -                   37,278,667                29,212,258               8,066,409               
42 Drawdown from Reserves -                   -                   -                   -                                (2,604,000 )                2,604,000               
43 TOTAL EXPENDITURE 582,582,136  578,494,011  4,088,125      886,196,929              874,259,794             11,937,135             
44 SOURCES OF FUNDING 681,689,945  681,689,945  -                   886,196,929              886,196,929             -                            
45 Aggregate External Finance 555,498,049  555,498,049  -                   722,147,464              722,147,464             -                            
46 Council Tax 121,576,512  121,576,512  -                   158,049,465              158,049,465             -                            
46 Use of balances 4,615,385      4,615,385      6,000,000                  6,000,000                
47 (SURPLUS) / DEFICIT (99,107,809 )   (103,195,935 ) (4,088,125 )    -                                (11,937,135 )              11,937,135             
48 Earmarked for Future Budget Pressures -                   -                   -                   -                                11,937,135               (11,937,135 )            
49 (SURPLUS) / DEFICIT (99,107,809 )   (103,195,935 ) (4,088,125 )    -                                -                               -                            
50 HOUSING REVENUE ACCOUNT (SURPLUS) / DEFICIT (34,458,156 )   (34,456,358 )   (1,798 )           -                                (1,067,000 )                1,067,000               
51 ADULT HEALTH AND SOCIAL CARE (SURPLUS)
/DEFICIT
(4,248,549 )    (10,784,051 )   6,535,502      -                                (8,496,152 )                8,496,152               
Appendix  1
NORTH  LANARKSHIRE COUNCIL
SUMMARY BY DIVISION FOR PERIOD ENDING 06 January 2023 (PERIOD 10)
PROVISIONAL
VARIANCES

Page 10

Appendix 2
Total
Total
Reserve
Balances 
2022/23
Revised
Earmarked
Reserve 
22/23
Projected
Spend 
Anticipated
Year End
Balance 
Anticipated
Future Year
Use 
No Longer
Required 
Profiled
for Future
Years 
Anticipated
Future Year Use 
No Longer
Required 
No Longer
Required
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Change Management Fund 29,424    29,424      1,624        27,800         27,800         -               -               -                        -               -               
Earmarked & One Off Resources
Schools Future Contractual Obligations 54,175    -               -               -                  -                  -               54,175      54,175               -               -              
COVID-19 Directed Funding 6,392      6,392        6,102        290             38                252           -               -                        -               252          
COVID-19 General Funding 21,662    19,900      17,725      2,175           2,168           7              1,762        1,762                -               7             
Covid Recovery (From Core) 3,000      3,000        3,000        -                  -                  -               -               -                        -               -              
Early Learning and Childcare 14,249    7,490        7,490        -                  -                  -               6,759        6,759                -               -              
Strategice Workforce Planning 13,000    13,000      13,000      -                  -                  -               -               -                        -               -              
Temporary Accomodation 9,288      9,288        9,288        -                  -                  -               -               -                        -               -              
2022/23 Budget One-off Investment 6,000      6,000        6,000        -                  -                  -               -               -                        -               -              
DSM Balances 5,332      5,332        5,332        -                  -                  -               -               -                        -               -              
Winter Reserve 1,500      1,500        -               1,500           1,500           -               -               -                        -               -              
Youth Guarantee Funding 2,367      2,367        2,367        -                  -                  -               -               -                        -               -              
Pupil Equity Fund 5,122      5,122        5,122        -                  -                  -               -               -                        -               -              
Energy Costs and Other Non Pay Inflation 7,220      7,220        7,220        -                  -                  -               -               -                        -               -              
Digitisation 2,499      1,892        1,135        757             -                  757           607           607                   -               757          
Digital NL Savings 1,000      1,000        1,000        -                  -                  -               -               -                        -               -              
Enterprise Contract 1,686      1,000        634           366             366              -               686           686                   -               -              
Business Gateway & Business Recovery 1,700      801           201           600             600              -               899           899                   -               -              
Active and Creative Communitites 2,000      2,000        2,000        -                  -                  -               -               -                        -               -              
Rapid Rehousing (Non-COVID) 1,159      650           650           -                  -                  -               509           509                   -               -              
Other Earmarked Funds 11,093    9,676        9,476        200             200              -               1,417        1,417                -               -               
Earmarked & One Off Resources Total 170,444  103,630    97,742      5,888           4,872           1,016        66,814      66,814               -               1,016       
Total Reserves 199,868  133,054    99,366      33,688         32,672         1,016        66,814      66,814               -           1,016       
Contingency Reserve 8,000     
Unallocated Balance 28,396   
General Fund Surplus at 31 March 2021 236,264 
NORTH LANARKSHIRE COUNCIL
ANTICIPATED COMMITMENTS AGAINST EARMARKED RESERVES AS AT 06 January 2023 (PERIOD 10)
2022/23 Future Years

Page 11

Appendix 3
£000 £000
Total Balance B/f per 2021/22 Annual Accounts 29,424 29,754
Approved commitments (819)
29,424 28,935
Period 10 reported variance 0
Earmarked Reserves no longer required 1,016
Total Balance 2022/23 before commitments 29,424 29,951
Known Commitments :- Revised one - off costs of approved savings (1,624)
Draw down from Capital Fund 396
Total Balance 2022/23 27,800 30,347
Estimated future Capital Fund Drawdown to 2023/24 1,000
Forecast Balance 27,800 31,347
NORTH  LANARKSHIRE COUNCIL
AVAILABILITY OF GENERAL FUND BALANCES AS AT 06 January 2023 (PERIOD 10)
Change Management
Fund
Unallocated General
Fund