Page 1

North Lanarkshire Council     
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref AM/IM Date 30/11/22 
Proposed Sub Station at Netherton Road, Wishaw 
From  James McKinstry, Head of Asset and Procurement Solutions  
E-mail martini@northlan.gov.uk  Telephone Ian Martin
07966 397637 
Executive Summary
The purpose of this report is to seek Committee approval for a lease to SP Distribution PLC
for an electrical substation and associated servitude for cables, pedestrian and vehicular
rights of access on land at Netherton Road, Wishaw. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1)  Agrees to grant a new lease to SP Distribution PLC or their nominees for a
substation and associated servitude for cables, pedestrian and vehicular rights of
access on land at Netherton Road, Wishaw on the terms detailed within this report;
and 
(2)  All other terms and conditions to be adjusted by the Head of Asset & Procurement
Solutions. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (3) Maximise the use of our marketable land and assets through
improved development in business and industrial infrastructure

Page 2

1. Background 
1.1 The proposed new electrical substation is a replacement for an existing substation
located nearby. Scottish Power have confirmed that the equipment within the existing
substation is coming to the end of its economic lifespan. 
1.2 The site at Netherton Road has been identified by Scottish Power as being suitable for
the new substation to ensure a smooth transition of the electrical supply to residents
and businesses within the Netherton area. 
1.3 Provisional agreement has been reached between North Lanarkshire Council and SP
Distribution PLC for a 175 year lease. 
2. Report 
2.1 The substation is to be sited within an area of amenity land at Netherton Road, as
shown on the attached plan. 
2.1.2 The proposed area to be leased extends to 25 square metres (269 sq. ft.) or thereby. 
2.1.3 A servitude right of access for cables, pedestrian and vehicular access to the  
substation will be taken from Netherton Road. 
2.2 Lease Proposal 
A provisional agreement has been reached with SP Distribution PLC on the following
terms and conditions: 
2.2.1  Rent:  £150 per annum. 
2.2.2 Date of Entry: Upon conclusion of missives or as agreed between the parties 
2.2.3 Term:  175 years 
2.2.4 Rent Review: Five yearly 
2.2.5 Legal Costs: The tenant will meet the costs of both parties reasonably incurred 
legal fees.   
3. Measures of success 
3.1  Provision of a sustainable electrical supply to the residents and businesses within the 
Netherton area of Wishaw.   
4. Supporting documentation 
Appendix 1 – Location Plan

Page 3

James McKinstry
Head of Asset and Procurement Solutions

Page 4

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☒ No ☐
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
It is considered good estate management practice to secure good tenants on long
term leases and therefore this proposal is of benefit to the Council in revenue terms.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts have been discussed and agreed with People
and Organisational Development?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic Solutions?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact

Page 5

Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group
(EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed?

Page 6

Appendix 1