23 February 2026 
Members of the 
Finance and Resources Committee
Chief Executive’s Office
Rachel Blair
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Finance and Resources Committee is to be held in
the Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on
Wednesday, 04 March 2026 at 10:00 AM which you are requested to attend. 
The agenda of business is attached. 
Rachel Blair
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Karen Swan
Clerk Telephone: 07919 730272
Clerk Email: committee@northlan.gov.uk 
B McCulloch, P McDade, A Ballinger, A Beveridge, M Boyd, T Carragher, C Costello, S
Coyle, G Currie, K Duffy, T Fisher, J Hume, D Johnston, T Johnston, P Kelly, A Khan, K
Larson, J Logue, H Loughran, F MacGregor, A Masterton, J McLaren, M McPake, J
McPhilemy, L Nolan, P Patton, C Quigley, L Roarty, G Robinson, W Shields, L Stubbs, R
Sullivan, A Thomas, J Toner, S Watson, C Williams, G Woods.  
Page 1 of 248

Page 2

Page 2 of 248

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000   
Operational   
2 Additional Bank Holiday – Monday 15 June 2026
Submit report by the Chief Officer (People Resources)
setting out the options following the Scottish
Government announcement. 
7 - 14 
3 Annual Data Protection Compliance and Activity
Report for Financial Year 2024/2025
Submit report by the Chief Officer (Legal and
Democratic) providing a comprehensive and strategic
assessment of North Lanarkshire Council’s
performance and compliance with its statutory data
protection and information governance obligations
during the financial year 2024/25. 
15 - 28 
4 Senior Information Risk Owner (SIRO) - Information
Governance - Assurance and Performance Interim
Report
Submit report by the Chief Officer (Legal and
Democratic) providing assurance that the Council’s
information governance, data protection and
information security arrangements remain effective,
proportionate and appropriately overseen. 
29 - 38 
5 Procurement Strategy 2026/27
Submit report by the Chief Officer (Assets and
Procurement) providing an update on the Procurement
Strategy 2026/27. 
39 - 72 
6 Land Reallocation - Former St Mary's School, Hill
Street, Caldercruix ML6 7PZ
Submit report by the Chief Officer (Assets and
Procurement) seeking approval for the transfer of land
held by Education & Families for inclusion in the new
build programme. 
73 - 78
Page 3 of 248

Page 4

Financial   
7 Revenues and Benefits Update
Submit report by the Chief Officer (Finance and
Technology) providing an update on the performance
within the Revenues and Benefits functions of Finance
& Technology as at 31 December 2025. 
79 - 86 
8 Revenue Monitoring Report Council Summary 1
April 2025 to 2 January 2026
Submit report by the Chief Officer (Finance and
Technology) providing update on the overall financial
position for the General Fund Account, Housing
Revenue Account and Adult Health and Social Care,
for the financial year to 31 March 2026. 
87 - 98 
9 Revenue Budget Monitoring Report; Chief
Executive's Service 1 April 2025 to 2 January 2026
(Period 10)
Submit report by the Chief Officer (Finance and
Technology) providing a summary of the Chief
Executive’s Service financial performance for the
Period 1 April 2025 to 2 January 2026 (Period 10). 
99 - 110 
10  Capital Programme 2025/26 Monitoring Report
Submit report by the Chief Officer (Finance and
Technology) providing an update on the 2025/26
resources and expenditure for the Council's Strategic
Capital Investment Programme. 
111 - 124 
11  Chief Executives Service - Capital Monitoring
Report 1 April 2025 to 2 January 2026 (Period 10)
Submit report by the Chief Officer (Finance and
Technology) highlighting the financial performance and
projected outturn of 2025/26 Chief Executive Service’s
capital programme for the period ended 2 January
2026 (Period 10). 
125 - 132
Page 4 of 248

Page 5

12  Review of 2025/26 to 2027/28 Budget Savings
Submit report to the Chief Officer (Finance and
Technology) providing an update on the achievement
of the three-year financial savings total of £8.326m
approved as part of the 2025/26 budget setting
process. 
133 - 138 
13  Local Taxation Debt Write-Off 2025/26
Submit report by the Chief Officer (Finance and
Technology) detailing a summary of outstanding local
taxation accounts which are deemed uncollectible
following all attempts at recovery. 
139 - 144 
14  Treasury Management Monitoring Report for
Quarter ended 31 December 2025
Submit report by the Chief Officer (Finance and
Technology) informing of the quarterly Treasury
Management activity for the period from 1 October to
31 December 2025 together with the mandatory
treasury and prudential indicators. 
145 - 162 
15  Treasury Management Strategy 2026/2027 Treasury
Management and Prudential Indicators 2026/2027
to 2030/2031
Submit report by the Chief Officer (Finance and
Technology) seeking approval the Treasury
Management Strategy 2026/2027 and adopts the
Treasury Management and Prudential Indicators for
2026/2027 to 2030/2031. 
163 - 208 
16  Future of Council Tax in Scotland: Consultation
Submit report by the Chief Officer (Finance and
Technology) outlining the response with regards to the
Future of Council Tax in Scotland submitted on behalf
of the Council by the deadline of 30 January 2026. 
209 - 220  
Contracts   
17  Postal Contract Variation
Submit report by the Interim Chief Officer (Strategy and
Engagement) advising of the postal services contract
which commenced on 1 January 2024 and is due to
conclude on 30 June 2026. 
221 - 228
Page 5 of 248

Page 6

18  Contract Award for Provision of LAN / SAN
Hardware Supply & Maintenance 2026-2029
Submit report by the Chief Officer (Finance and
Technology) seeking approval to award of a contract
from Provision of LAN/ SAN Hardware Supply and
Maintenance. 
229 - 238 
19  Contract Awards Below Committee Approval
Threshold
Submit report by the Chief Officer (Assets and
Procurement) notifying of the Contracts Awarded since
the last meeting of the Committee with a value below
the financial threshold requiring approval. 
239 - 248  
EXCLUSION OF PUBLIC
The Sub-Committee is asked to consider passing the
following resolution: "That under Section 50A(4) of the
Local Government (Scotland) Act 1973, the public be
excluded from the meeting for the following item of
business on the grounds that it involves the likely
disclosure of exempt information as defined in
paragraph 9 of Part 1 of Schedule 7A of the Act". 
20  Land Acquisition
Submit report by the Chief Officer (Assets and
Procurement) seeking approval for the acquisition of
land for the inclusion of the housing supply
programme. 
21  Property Acquisition
Submit report by the Chief Officer (Assets and
Procurement) seeking approval for the acquisition of
property for the inclusion of the housing supply
programme. 
Page 6 of 248

Page 7

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    FW/ LC Date 04/03/26 
Additional Bank Holiday – Monday 15 June 2026 
From  Fiona Whittaker, Chief Officer (People Resources)  
E-mail WhittakerF@northlan.gov.uk Telephone 07973 728628 
Executive Summary
On 5 January 2026, the First Minister, John Swinney announced an intention to mark
Scotland’s qualification for the men’s World Cup finals, their first appearance since 1998,
by designating Monday 15 June 2026 as a national bank holiday to celebrate the men’s
football team’s opening match against Haiti in Boston on the night of Sat 13th and into the
early hours of Sun 14th June 2026. The Scottish Government further confirmed that this
proposal received Royal Assent on Thursday 5th February 2026. 
At this stage it is understood that support for awarding an additional bank holiday across
Local Government is mixed and a significant number of councils are believed to be
considering not to award the public holiday or have already communicated this position to
their staff. The Scottish Government have confirmed in their announcement that there is
no legal requirement for businesses to close and that employer policy regarding bank
holidays should prevail. This means that councils remain free to choose their position, and
there is no legal obligation to close buildings, schools, or public services based on statutory
commitments, operational need, financial considerations, and the potential implications of
setting future precedents relating to events of this nature. 
Concerns have also been raised about the disruption such a holiday will cause to children’s
education, particularly given existing pressures on learning time and attendance. There is
also recognition that a celebration centred on men’s football may not be universally
supported and risks excluding those who are not football fans or who do not identify with
the associated culture of the event. 
Additionally, the Employers Team within COSLA have indicated that they will defer to
individual Local Authorities as employers to make the final decision, as has been the case
for other additional public holidays in recent years. Similarly, it is understood that NHS
Boards are not likely to award the 15th June as an additional public holiday and final
consideration of their position on the matter is currently being reviewed at a national level.
On this basis and considering other matters outlined within the report, officers are not
recommending that the council agree to adopt Monday 15th June as an additional bank
holiday.
Following announcement from the Scottish Government that the June holiday has been
formally granted Royal Assent, the council now requires to consider its own position on this
matter. This is necessary to enable timely communication to services and engagement with
staff and trade unions on the matter. It should be emphasised that if a decision were to be
deferred to the planned cycle 2 Finance & Resources Committee on the 27th May, it would
Item 2
Page 7 of 248

Page 8

leave insufficient time to put arrangements in place for both staff and services should the
holiday be awarded.
Elected Members will be aware that previously awarded additional bank holidays, aligned
to events within the Royal Family in 2022 and 2023 received immediate Royal Assent,
which allowed the Council more time to agree its position and manage the impact on
services. This included a requirement to make a formal application to Scottish Government
to reduce the number of statutory teaching days to support the agreed closure of schools. 
It is important to emphasise that the council remains keen to support and endorse the wider
intention behind the proposed public holiday for such an historic event, and its importance
to the pride of the Scottish nation. Aligned to this we have included for consideration within
the report additional measures which could be undertaken to enable as many staff as
possible to participate with their families, without incurring significant costs or disruption to
our services. We are also keen to ensure that we are enabling our communities to
participate, to celebrate and to feel part of a national event, and information on early
planning for community events to support this is included within the report.
Accordingly, and with the known information available to officers at this time, this report is
designed to enable Finance and Resources Committee to consider the position and agree
a clear way forward to enable the council and its services to proceed on this matter. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the First Minister’s designation that Monday 15 June 2026 be adopted
as an additional bank holiday and that this has received Royal Assent. 
(2) Acknowledge and approve North Lanarkshire Council’s decision not to recognise
Monday 15 June 2026 as a bank holiday, for the reasons outlined in this report. 
(3) Acknowledge the alternative arrangements that will be made available to employees
to support their participation wherever possible. 
(4) Acknowledge the wider facilities being considered for the local community to ensure
that everyone has the opportunity to enjoy Scotland’s participation in the World Cup. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (23) Build a workforce for the future capable of delivering on our
priorities and shared ambition
Programme of Work All Programmes of Work
Page 8 of 248

Page 9

1. Background 
1.1 The First Minister has announced his intention to designate Monday 15 June 2026 as
a bank holiday to mark Scotland men’s football team’s participation in the World Cup
and this received Royal Assent from His Majesty the King on 5th February 2026. 
1.2 The Council does not normally recognise bank holidays, although it is accepted that in
recent years there have been several unforeseen and exceptional circumstances that
have resulted in the closure of services and schools and a bank holiday being
recognised including the funeral of Queen Elizabeth II and the Coronation of the King. 
1.3 For clarification, bank holidays (although not normally recognised by the council) are
holidays when banks and many other businesses are closed for the day. Public
holidays are holidays which have been observed by custom and practice i.e. Christmas
day and Easter Friday. 
1.4 Although the council has supported recent additional bank holidays, these decisions
were also backed by national guidance, with COSLA encouraging all councils to
observe the specific day and occasion. However, no such guidance has been issued
in relation to the proposed bank holiday on 15 June 2026, and COSLA has confirmed
that it will be for individual councils to decide whether they wish to recognise this
additional bank holiday. 
1.5 Furthermore, previous additional bank holidays have marked events of national
significance across the whole of the United Kingdom and were supported by clear
guidance. In contrast, the proposed bank holiday on 15 June 2026 relates solely to a
sporting event, which does not carry the same broad public relevance. 
1.6 There are also concerns about setting a precedent for recognising future events in
which Scotland participates, and whether doing so could be viewed as inconsistent or
discriminatory given that a similar gesture was not proposed when Scotland’s women’s
national football team reached the World Cup group stages in 2019. 
1.7 Consideration must also be given to the potential disruption to service delivery,
including the closure of schools and early years establishments, as well as the
additional costs associated with enhanced overtime rates required to maintain essential
services. 
1.8 The Scottish Government have confirmed with regard to schools and closures arising
from observance of the bank holiday on 15 June, that if a council permits the closure
of its schools on 15 June resulting in the provision of fewer than 195 school days as
required by the Schools General (Scotland) Regulations 1975, then a request to the
Scottish Ministers for an exemption from the 195 school days would be required.  
1.9 Similarly, with regard to Early Learning & Childcare (ELC) Provision, councils have
been advised that providing 1140 hours of funded ELC over the course of the year is a
statutory obligation, and that individual councils would need to consider how services
would need to be adjusted in order to maintain their statutory requirement of providing
1140 hours of funded ELC over the course of the year. 
1.10 Without clear national direction or a compelling public interest case and given the
operational and financial implications for council services, it is considered that there is
a reasonable basis for the council to decide not to recognise this additional bank
holiday. 
1.11 Finally, although exact figures were not available at the time of writing, it is understood
that the majority of local authorities are planning not to recognise the bank holiday on
Page 9 of 248

Page 10

15 June 2026, with some having already formally communicated this position to their
staff. 
2. Report 
Legal Position 
2.1 Under the Scotland Act 1998, Scottish Ministers are responsible for setting bank
holidays, while the Banking and Financial Dealings Act 1971 provides the statutory
basis for UK and Scottish bank holidays, including provisions for appointing special
one-off holidays by royal proclamation. On 5 January 2026, the First Minister
announced his intention to designate Monday 15 June 2026 as a national bank holiday
in Scotland to allow those who wished to do so to participate in Scotland’s opening
World Cup match. It should be noted that the match itself takes place in the early hours
of the morning of Sunday 14 June and therefore the proposed bank holiday does not
cover the football event itself. 
2.2 There is no statutory right for employees to get public holidays off work. Any right to
time off depends on the terms of the employee’s contract of employment. If the contract
of employment entitles the worker to a specified number of days' holiday inclusive of
bank and public holidays, then the additional holiday will have no effect on the overall
contractual entitlement. If the contract entitles the worker to a specified number of days’
holiday plus all recognised bank and public holidays, they will be contractually entitled
to the additional day. 
2.3 As contracts of employment within the council outline the number of days leave
inclusive of public holidays, which are clearly specified, there is no contractual
entitlement to the additional days leave. It is the decision of the council as to whether
to award the additional day and whether this should be a bank holiday or annual leave
day. 
2.4 The conditions that govern single status staff (known as the Red Book) state that
general and public holidays recognised by the council for its employees will be granted
as holidays with pay and that by local agreement some of these may be added to
annual leave. However, where a decision is taken that an additional day is to be classed
as a bank holiday, enhanced rates are applied for those who are required to work as
part of their normal working week and for those who are undertaking overtime. 
Operational and Organisational Issues 
2.5 If the council was to recognise the additional bank holiday on Monday 15 June 2026,
all schools and educational establishments would be required to close, reducing the
statutory number of school days in North Lanarkshire. As confirmed, such reduction
requires separate approval from the Scottish Government and the administrative and
educational impact could be viewed as disproportionate by parents and guardians,
particularly if they have to attend their own work on this day with no childcare available. 
2.6 An additional bank holiday also creates challenges for ensuring continuity of essential
services, particularly in areas such as social care, waste and housing, where staffing
levels must be maintained to protect vulnerable individuals and meet statutory
obligations. Additionally, those who are required to work in essential services either as
part of their normal working week or as overtime, will attract enhanced rates and
benefits, increasing the costs of operating the services on that day. It is estimated that
the last exceptional bank holiday provided in recognition of the Coronation of the King
resulted in a cost to the Council of circa £500k. 
Page 10 of 248

Page 11

2.7 As outlined above, additional bank holidays result in significant additional expenditure,
and given the ongoing financial pressures on the council, the cost of granting a
discretionary holiday, including the closure schools and early years establishments, for
the purpose of a football match may be difficult to justify to the public. Such a decision
could also attract negative publicity and risk adversely affecting the reputation of both
the council and its employees. 
2.8 North Lanarkshire Council promotes equalities in employment and in the services it
provides. A bank holiday to watch a sporting event is unlikely to benefit all employees
equally and could be viewed as less inclusive and could jeopardise the reputation of
treating all staff fairly, equally and consistently. 
Proposal 
2.9 Although Scotland’s participation in the 2026 World Cup is an important sporting
achievement, it remains fundamentally a sporting event. Not all employees have an
interest in sport, and its significance is not comparable to the nationally important
occasions for which bank holidays have previously been granted. Introducing an
additional bank holiday for a sporting event may therefore lack broad public support
and would not align with the rationale applied to previous decisions. 
2.10 Furthermore, without national guidance or COSLA direction, the Council would be
taking an exceptional and potentially inconsistent approach by designating a local bank
holiday for a sporting occasion. It must also consider operational, financial and service
delivery impacts which may be difficult to justify in the absence of a clear national
mandate or compelling public interest case. 
2.11 Based on the above, it is proposed that the Council decline to designate Monday 15
June 2026 as an additional bank holiday. It should be noted that early discussions have
taken place with Trade Unions to indicate that the proposed bank holiday is not a given
for approval, and that this reflects the predominant position across other local
authorities.   
Arrangements for Employees  
2.12 In recognition that some employees will wish to watch Scotland’s first match against
Haiti, managers will be asked to approve annual leave requests for Monday 15 June
2026 where operationally feasible, and to consider reduced staffing levels where
appropriate to accommodate a higher volume of requests. Managers should also
consider flexible arrangements around start and finish times on days when matches
are broadcast late in the evening or early in the morning, provided such arrangements
can be supported without detriment to service delivery. Overall, all services are
expected to operate as normal, with no noticeable impact on performance or service
standards. 
Wider Community Arrangements 
2.13 Building on the success of the Fan Zone at Broadwood Stadium, which provided an
inclusive, family friendly environment for communities during the UEFA European
Championships to enjoy the football, consideration is being given to organising similar
events. Initial plans are focused on a family-focused afternoon packed with inflatables,
face painting, and “come and play” sports taster sessions which are perfect for kids and
adults alike. With an overall focus on celebrating Scotland's achievements and our
hopes, the event is proposed to take place at Ravenscraig Regional Sports Facility,
using our FIFA standard pitch as the base for all activities. Live entertainment and
refreshments will allow customers of all ages to spend the day building excitement
Page 11 of 248

Page 12

ahead of the match friendly environment for communities -friendly environment for
communities 
2.14 While the Council recognises that screening World Cup matches in local licensed
premises may bring benefits to customers, the local economy and local businesses, it
is currently awaiting the statutory guidance to be issued by the Scottish Government
under section 142 of the Licensing (Scotland) Act before bringing forward any options
for consideration. 
2.15 It will be a matter for the Licensing Board, in the exercise of its independent statutory
functions, to consider that guidance and to determine what, if any, approach should be
adopted within its area. The Clerk to the Licensing Board is awaiting that guidance
before proposing any recommendations or options to the Licensing Board for its
consideration. 
Next Steps 
2.16 Once the Council’s proposed position has been agreed by Finance & Resources
Committee, appropriate communications will be issued to staff, parents and the local
community and work will continue to ensure that both employees and residents have
an opportunity to enjoy this significant sporting event. 
3. Measures of success 
3.1  A fair and consistent approach is taken to ensure employees are provided with an
opportunity to watch the football during the period of the World Cup if they desire to do
so. 
3.2 The Council is seen to support and endorse the importance of this event, whilst not
incurring additional costs or impacting on local services for residents and those who
are most vulnerable in our communities. 
3.2 The Council will continue to be regarded as a professional organisation that upholds
strong business standards and remains committed to equal opportunities. 
4. Supporting documentation 
4.1 Not applicable 
Fiona Whittaker 
Chief Officer (People Resources) 
Page 12 of 248

Page 13

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Equality Impact Assessments will form a key part of the review process and will be
undertaken at the appropriate point in the project. 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Costs will only be applicable if the proposal is rejected and the decision is taken to
designate Monday 15 June 2026 as an additional bank holiday.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Contractually, employees are not entitled to an additional day’s leave and therefore
there is no change to terms and conditions or contractual entitlements.
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒  
Page 13 of 248

Page 14

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
There will be a requirement to communicate to staff and the wider community if the
proposal is agreed not to designate Monday 15 June 2026 as an additional bank
holiday.
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 14 of 248

Page 15

North Lanarkshire Council Report 
Does this report require to be approved? ☐ Yes  ☒ No
Ref REB/CC Date 04/03/26 
From Rachel Blair, Chief Officer (Legal and Democratic)
E-mail BlairR@northlan.gov.uk Telephone 
Executive Summary
This report provides a comprehensive and strategic assessment of North Lanarkshire
Council’s performance and compliance with its statutory data protection and information
governance obligations during the financial year 2024/25. It presents a detailed analysis of
personal data breaches, engagement with the Information Commissioner’s Office (ICO),
Subject Access Request (SAR) performance, staff training and awareness, and the
effectiveness of governance and assurance arrangements. The report fulfils the
requirement for the Data Protection Officer (DPO) to report and provides assurance on the
Council’s overall compliance position.
Overall, the Council has demonstrated measurable and sustained improvement across
several key areas of compliance. In particular, notable progress has been achieved in the
management and governance of SARs within Social Work services, the development and
delivery of targeted, service-specific training, and a significant increase in completion rates
for mandatory data protection and information security training. These improvements
reflect strengthened leadership oversight, clearer accountability, and increased
organisational focus on information governance as a core corporate responsibility. 
Notwithstanding this progress, the report also identifies areas where further improvement
is required to ensure full and consistent compliance with statutory requirements and
regulatory expectations. Increased scrutiny from the ICO, particularly in relation to SAR
performance, underscores the need for continued focus on timely and high-quality
responses, improved recording and tracking arrangements, and sustained staff awareness
to prevent avoidable personal data breaches. A clear programme of ongoing and planned
improvement actions is therefore set out to address these risks and to support continuous
improvement.
The report also provides strategic insight into emerging legislative frameworks,
technological enablers, and organisational trends that will influence the Council’s
information governance practices over the next three to five years. By integrating these
insights, the Council can proactively manage regulatory change, optimise operational
efficiency, and strengthen trust with residents, partners, and regulators. 
Finance and Resources Committee
Annual Data Protection Compliance and Activity Report for
Financial Year 2024/2025
Item 3
Page 15 of 248

Page 16

Recommendations
It is recommended that Finance and Resources Committee:
(1) Acknowledge the Council’s data protection and information governance performance
during 2024/25, including improvements achieved and areas requiring further
development; 
(2) Acknowledge the statutory roles, responsibilities, and assurance provided by the
Senior Information Risk Owner (SIRO) and the Data Protection Officer (DPO);
(3) Acknowledges the ongoing and planned improvement actions, including:
a. Strengthened breach reporting and incident response processes;
b. Continued emphasis on mandatory training and staff awareness across all
Council services;
c. Updated and enhanced policies, guidance and internal awareness campaigns;
d. Targeted training and support in higher-risk Service areas; and
e. Enhanced monitoring, reporting and senior oversight of SAR performance.
(4) Acknowledge the incorporation of forward-looking, evidence-based strategies to
anticipate and adapt to evolving regulatory requirements, technological innovations,
and emerging data governance risks; 
(5) Acknowledge further development and refinement of information governance
processes, including reviewing performance indicators, enhancing Schedule 2
request management, improving Data Protection Impact Assessments and Data
Sharing Agreements, providing targeted training, updating guidance materials, and
ensuring ongoing staff support; and
(6) Acknowledge that information governance improvement remains a corporate priority
and is embedded within service planning, digital transformation, and risk
management arrangements. 
The Plan for North Lanarkshire
Priority All priorities
Ambition statement All ambition statements
Programme of
Work Statutory / corporate / service requirement 
Page 16 of 248

Page 17

1. Background 
1.1 As a public authority and data controller, North Lanarkshire Council is subject to a
comprehensive statutory framework governing the processing of personal data.
Effective data protection and information governance are fundamental to maintaining
public confidence, safeguarding individuals’ rights, and ensuring compliance with
statutory obligations, including the Data Protection Act 2018 and the UK General Data
Protection Regulation (UK GDPR). This legislation imposes impose enhanced
accountability obligations, requiring the Council not only to comply with legal
requirements but to be able to demonstrate that compliance through effective
governance, documentation, and assurance. 
1.2 Regulatory expectations, particularly those articulated by the ICO, have increasingly
emphasised leadership accountability, evidence-based decision-making, and
demonstrable continuous improvement. This report reflects that context and provides
an integrated view of performance, risk, and assurance across the Council’s information
governance landscape. 
1.3 During 2024/25, the Council has continued to strengthen its arrangements across the
following core areas: 
• Management and reporting of personal data breaches;
• Engagement and compliance with the Information Commissioner’s Office (ICO);
• Delivery of mandatory and targeted staff training;
• Compliance with individuals’ information rights, particularly SARs; and
• Strengthening governance, assurance, and accountability structures. 
1.4 A strategic focus has been placed on anticipating emerging risks, embedding a culture
of accountability, and ensuring that operational practices are both proactive and
resilient to future regulatory developments. The Council has also sought to integrate
technological solutions, including SAR tracking systems and secure communication
platforms, to enhance efficiency and reduce human error. 
2. Report 
2.1 Robust governance arrangements are in place to provide strategic leadership,
operational oversight, and assurance in relation to information governance and data
protection compliance: 
2.1.1 The Senior Risk Owner (SIRO) provides strategic leadership on information
governance and information risk management across the Council, ensuring that
information risks are identified, understood, and managed in line with the
Council’s risk appetite and statutory obligations. During 2024/25, the SIRO role
was undertaken by the Chief Officer (Business and Digital); 
2.1.2 The Data Protection Officer is responsible for overseeing compliance with data
protection legislation, including the UK GDPR and the Data Protection Act 2018,
providing independent advice to the Council, monitoring internal compliance,
advising on Data Protection Impact Assessments (DPIAs), and acting as the
primary point of contact with the Information Commissioner’s Office (ICO).
During 2024/25, the DPO role was undertaken by the Chief Officer (Legal and
Democratic);
Page 17 of 248

Page 18

2.1.3 The Data Governance Board (DGB) provides strategic oversight of data
protection and information governance, with regular reporting to the Business
and Corporate Management Teams. It is responsible for setting direction,
overseeing implementation, and securing assurance that effective
arrangements are in place across the Council and its Arm’s Length External
Organisations; and 
2.1.4 The Data Management Team supports the DGB by providing operational
oversight, monitoring compliance, and driving day-to-day implementation and
improvement. 
2.2 The Information Governance Team within Legal and Democratic Services provides
specialist legal advice and support across a wide range of information governance
legislation, ensuring that services are supported to meet their statutory obligations.
Through a combination of strategic oversight, operational monitoring, and continuous
engagement with services, the Council ensures that its approach to data protection is
integrated, proactive, and aligned with best practice. 
Personal Data Breaches
2.3 A personal data breach is defined as a security incident that results in the accidental
or unlawful destruction, loss, alteration, unauthorised disclosure of, or access to,
personal data. This includes situations where personal data is made temporarily or
permanently unavailable, where such unavailability is likely to have a significant
adverse effect on individuals.
2.4 Where a personal data breach occurs, the Council is required to assess the likelihood
and severity of any resulting risk to individuals’ rights and freedoms. Where the
assessment concludes that a risk is likely, the Council must notify the Information
Commissioner’s Office (ICO). Where a breach does not meet the reporting threshold,
the Council is required to clearly document the rationale for that decision in
accordance with the accountability principle under UK GDPR. 
2.5 In circumstances where a breach is assessed as likely to result in a high risk to the
rights and freedoms of affected individuals, UK GDPR requires the Council to inform
those individuals directly and without undue delay. This assessment considers both
the potential severity of impact and the likelihood of harm occurring. Timely notification
enables individuals to take appropriate steps to protect themselves and mitigate
potential adverse consequences. 
2.6 During the financial year 2024/2025, the Council recorded a total of 102 personal data
breaches, representing a significant reduction from 152 breaches in the previous
financial year (2023/2024). Of these, six breaches met the threshold for reporting to
the ICO, compared with ten in the previous year. This reduction reflects improving
staff awareness, strengthened controls, and targeted preventative measures.
2.7 Table 1 below provides a service-level breakdown of recorded personal data breaches
during 2024/2025, together with incidents classified as near misses. In line with ICO
guidance, a near miss is defined as an incident that had the potential to result in a
personal data breach but was successfully prevented.
Page 18 of 248

Page 19

Table 1 
Service Number of
Breaches
Number of
Near Misses
Reported to
ICO
Reported to
lCO within
72 hrs
Report
to legal
within
24
Adult Health &
Social Care
19 2 2 0 13
Chief
Executive’s
Office
22 0 1 1 13
Education &
Families
44 0 2 1 33
Enterprise &
Communities
17 1 1 1 12
Total 102 3 6 3 71 
2.8 Personal data breaches that meet the statutory reporting threshold must be notified to
the ICO within 72 hours of the Council becoming aware of the breach. To support
compliance with this requirement, the Council operates an internal target whereby
services are required to notify the Information Governance Team within 24 hours of
becoming aware of an incident, even where only preliminary information is available.
During 2024/2025, 71 of the 102 breaches were reported to the Information
Governance Team within the 24-hour internal target. Of the six breaches requiring
notification to the ICO, three were reported within the statutory 72-hour timeframe. 
2.9 The remaining 96 breaches did not meet the threshold for notification to the ICO. The
reasons for this are summarised in Table 2 below and reflect circumstances where
the risk to individuals was assessed as low, such as successful recall or deletion of
information, disclosure to trusted third parties bound by confidentiality, or limited
personal data exposure.
Table 2 
Service Trusted third
party
(bound by
confidentiality
terms e.g.
existing
employee,
Solicitor is
the recipient)
Includes
recall,
deletion or
retrieved
Recipient
Retrieval of
document(s)
or
document(s)
destroyed
(no special
category
data)
Information
disclosed
contained
Limited
personal
data
Email
confirmed
deletion
Process/
System
Error
rectified
Passage
of time
low risk
Adult Health &
Social Care
10 3 1 3  
Chief
Executive’s
Office
7 1 3 8 2 
Education &
Families
10 14 1 15 1 1
Enterprise &
Communities
7 3 3 2  1
Page 19 of 248

Page 20

2.10 Of the six breaches reported to the ICO, three were not notified within the statutory
72-hour timeframe. Two delays were attributable to delays at service level, while the
third occurred prior to June 2024, at which time the breach reporting form did not
require the reason for delay to be recorded and, as a result, no information is held as
to the reason for that delay. 
2.11 To address this, the Council updated its breach notification form in June 2024 to
require services to record reasons for any delay in reporting to Legal and Democratic
Services and the ICO. This change strengthens accountability, improves auditability,
and supports targeted improvement activity. 
2.12 While compliance with the statutory reporting requirement has improved compared to
earlier years, performance during 2024/2025 shows some inconsistency. During
2022/2023, 70% of reportable breaches were notified within 72 hours. This improved
to 100% in 2023/2024. In 2024/2025, 86% of breaches were reported to Legal and
Democratic Services within 72 hours, indicating a need for renewed focus on timely
escalation. Prompt notification remains critical to enabling effective investigation,
mitigation, and regulatory compliance.
2.13 Analysis of the Data Breach Register identified 31 breaches that were reported to
Legal and Democratic Services outside the 24-hour internal target. In several early
cases, the previous version of the breach notification form was used, which did not
capture reasons for delay. The revised form now addresses this gap. 
2.14 Reasons cited by services for delays in reporting breaches within the 24-hour internal
target include: 
• School holidays, public holidays, and service closures;
• Delays in identifying or confirming a breach pending management input;
• Incidents occurring close to weekends; and
• Staff absence. 
2.15 These factors highlight the importance of ensuring resilience within Services. Where
a manager is unavailable, staff should escalate suspected breaches to an alternative
manager or directly to Legal and Democratic Services, rather than awaiting a
manager’s return. The revised breach notification form now requires services to
identify an alternative contact to support timely escalation. 
2.16 The ICO did not take enforcement action in relation to any of the breaches reported by
the Council during 2024/2025. It is noted, however, that the ICO’s revised regulatory
approach, introduced in June 2022 to reduce the financial impact of fines on public
sector bodies and emphasise engagement and learning, concluded in June 2024.
During the period of the revised approach, the ICO made increased use of alternative
regulatory tools, including warnings, reprimands, and enforcement notices. With the
conclusion of this approach, the likelihood of formal enforcement action, including
financial penalties, may increase, reinforcing the importance of continued compliance
and improvement. 
2.17 Where the ICO provided recommendations following reported breaches, these were
communicated to the relevant Services and supported by guidance from the
Information Governance Team to ensure implementation and learning. Following each
breach or near miss, the Information Governance Team works with the relevant service
to identify root causes and implement preventative measures. Learning is shared at
team, service, or corporate level, as appropriate, to support continuous improvement.
Page 20 of 248

Page 21

2.18 Analysis confirms that the majority of personal data breaches arise from human error,
such as misdirected correspondence, incorrect attachments, or failure to update
contact details. These risks are mitigated through improved staff vigilance, clear
processes, and targeted controls. Following issues identified with the introduction of
the Paris Delivery mail system, a cross-Service working group was established to
strengthen controls. This included additional staff training and the requirement for
Senior Officer checks prior to dispatch. The Council has introduced the Egress secure
email solution to reduce the risk of email-related breaches. This system prompts users
to verify recipients and attachments before sending, providing an additional safeguard
against human error.
2.19 Guidance has been issued to schools and nurseries to prepopulate annual data check
forms, reducing the risk of misdirected information. Some establishments have
adopted additional visual controls, such as coloured paper, to reinforce awareness.
To address risks associated with outdated pupil emergency contact details, schools
have been reminded to verify emergency contact information for all pupils, with
particular focus on those transferring between schools. 
2.20 The Information Governance Team continues to work collaboratively with services
following breaches to agree proportionate and practical preventative measures,
embedding learning into operational practice. Mandatory data protection training,
together with targeted sessions delivered by the Information Governance Team,
remains a critical control in reducing breach risk. Increased training uptake during the
reporting period is expected to contribute to a continued reduction in avoidable
breaches across the Council.
ICO Complaints
2.21 Eight complaints were recorded with the ICO during 2024/25, an increase on previous
years. The majority related to dissatisfaction with SAR handling rather than data
breaches. Detailed analysis indicates that this was influenced by operational
challenges, such as resource constraints, file accessibility issues, and lack of clarity on
ownership of requests.
2.22 These insights have directly informed the Council’s SAR improvement programme,
including process redesign, targeted training, and improved record-keeping, thereby
reducing the likelihood of future complaints and enhancing public confidence in the
Council’s data handling practices. 
Training and Awareness
2.23 Completion rates for mandatory data protection and information security training
increased significantly during 2024/25, with most modules now achieving completion
rates close to or exceeding 85%. This increase demonstrates a positive cultural shift
and greater staff engagement in their responsibilities for information governance. 
2.24 In addition, the development and delivery of targeted SAR training for Social Work and
other priority Services has strengthened staff capability and confidence in managing
complex requests. The use of service-specific scenarios and practical exercises has
been critical in translating legislative requirements into operational practice, ensuring
consistent, high-quality responses.
Page 21 of 248

Page 22

Subject Access Requests (SARs) 
2.25 Since April 2023, the ICO has required local authorities to submit regular statistical data
on Subject Access Request (SAR) compliance. Analysis of this data has informed a
targeted regulatory approach, with the ICO prioritising closer monitoring and
engagement with authorities whose SAR closure compliance falls below 75%. The
ICO’s stated expectation is that SAR compliance should consistently meet or exceed
90%.
2.26 During the financial year 2024/2025, the Council received 494 SARs, representing an
increase on the 465 requests received in 2023/24. A detailed breakdown of SAR
volumes and compliance performance is provided in Tables 3, 4, and 5 below. 
Table 3 SARs for Financial Year 2024/2025: 
Service No of SARs SARs responded
to on time
% responded
to on time
Social Work 314 234 75%
Non-Social Work 180 125 69%    
Total 494 359 72%
Table 4 SARs for Financial Year 2023/2024 
Service No of SARs SARs responded
to on time
% responded
to on time
Social Work 305 114 50%
Non-Social Work 160 80 83%    
Total 465 194 60% 
Table 5 SARs for Financial Year 2022/2023: 
Service No of SARs SARs responded
to on time
% responded
to on time
Social Work 126 52 41%
Non-Social Work 84 68 80%    
Total 209 120 57% 
2.27 Overall compliance with statutory response times improved to 72%, compared with
60% in the previous year. While this represents meaningful progress, particularly in the
context of increased demand, performance remains below the ICO’s expected
benchmark of 90%, and further improvement is required to fully mitigate regulatory risk
and ensure individuals’ information rights are upheld.
2.28 Significant improvement actions have been implemented, including strengthened
governance, clearer ownership, improved access to records, targeted training, and
enhanced monitoring and reporting. Early indications show these actions are having a
positive impact, particularly within Social Work services. 
2.29 Ongoing system enhancements, such as migration to Microsoft Teams for record
tracking, integration with AI-enabled tools, and real-time dashboards via Power BI,
provide the Council with deeper insights into workflow efficiency, risk exposure, and
Page 22 of 248

Page 23

operational bottlenecks. These measures allow proactive intervention and continuous
performance improvement.
DPIAs, Data Sharing and Schedule 2 Requests 
2.30 Data Protection Impact Assessments (DPIAs) and lawful data sharing arrangements
are critical preventative controls. Progress has been made in embedding DPIAs within
project governance, though further improvement is required to ensure consistent
application at service level.
2.31 The Council has also strengthened oversight of Schedule 2 requests, primarily from
Police Scotland, ensuring that disclosures are lawful, proportionate, and appropriately
documented. This aligns with ICO expectations around transparency and accountability
in data sharing. 
2.32 Ongoing work to review and refine Data Sharing Agreements will further strengthen
assurance and reduce risk. 
Legislative Developments – The Data Use and Access Act 2025
2.33 The Data Use and Access Act 2025 introduces significant amendments to the UK data
protection framework. While it does not replace existing legislation, it introduces new
lawful bases, clarifies SAR obligations, strengthens complaint handling requirements,
and updates international data transfer rules. 
2.34 The Council will undertake a structured review of policies, processes, and guidance to
ensure timely compliance as provisions of the Act are coming into force between 2025
and 2026. The Information Governance Team will continue to provide advice, training,
and updates to services as further guidance is issued.
2.35 This legislation provides both opportunity and challenge, requiring strategic planning to
integrate new compliance obligations into existing operational processes while
enhancing transparency, accountability, and public confidence. 
Strategic Insights and Forward Planning
2.36 The Council’s data protection agenda is increasingly aligned with broader strategic
objectives, including digital transformation, AI-enabled service delivery, and evidence-
based decision-making. By leveraging robust governance structures, technological
solutions, and targeted staff development, the Council is well-positioned to anticipate
future regulatory requirements, mitigate emerging risks, and maximise organisational
efficiency. 
2.37 Key forward-looking considerations include: 
• Embedding AI-assisted SAR processing to improve accuracy and reduce
response times;
• Continuous monitoring of DUAA implementation and alignment with ICO
guidance;
• Integration of data protection considerations into all digital service design and
transformation projects;
• Enhancement of cross-service data governance awareness and accountability;
• Ongoing evaluation of risk exposure, breach trends, and staff capability to
inform strategic resourcing decisions;
Page 23 of 248

Page 24

• Systematic review and refinement of key performance indicators to ensure they
accurately reflect compliance and operational effectiveness;
• Strengthening processes for Schedule 2 requests, ensuring statutory criteria
are consistently met and that monitoring and escalation processes are robust;
• Continued focus on completing Data Protection Impact Assessments (DPIAs)
for all high-risk processing activities, with integration into project planning and
risk management frameworks;
• Enhancing guidance and support materials, including scenario-based
resources and targeted communications to embed best practice; and
• Expanding tailored training programmes to cover emerging areas of risk,
legislative change, and evolving technology solutions.
Conclusion
2.38 The Council has made substantial and demonstrable progress in strengthening its data
protection and information governance arrangements during 2024/25. Improved
governance, increased training uptake, and targeted operational interventions have
delivered measurable improvements in compliance and performance. 
2.39 However, ongoing challenges remain, particularly in relation to SAR compliance,
consistent breach reporting, and proactive management of emerging regulatory and
operational risks. Sustained senior leadership oversight, continued investment in staff
capability, technological enhancements, and process improvements will be essential to
maintaining momentum, meeting regulatory expectations, and protecting the rights of
individuals. 
2.40 By adopting a forward-looking and strategic approach, the Council can continue to
evolve its data protection framework in line with emerging legislation, technological
advances, and public expectations. 
3. Measures of success
3.1 Success will be demonstrated through: 
• Sustained SAR compliance at or above 90% across all Services;
• Reduction in overdue SARs and escalation cases;
• Continued year-on-year reduction in personal data breaches;
• 100% compliance with mandatory training requirements;
• Consistent and timely completion of DPIAs for high-risk processing;
• Robust management and auditability of Schedule 2 requests and data sharing;
• Positive regulatory outcomes and reduced ICO complaints;
• Clear and regular assurance reporting to senior management and elected
members; and
• Embedded information governance considerations within all major projects and
digital initiatives. 
4. Supporting documentation
None.
Rachel Blair
Chief Officer (Legal and Democratic) 
Page 24 of 248

Page 25

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact   
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact   
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact   
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The report contains legal impacts arising from the Council’s statutory duties under
data protection and information governance legislation, including the UK General
Data Protection Regulation (UK GDPR) and the Data Protection Act 2018. These
duties require the Council to maintain effective governance arrangements, comply
with statutory timescales (particularly in relation to Subject Access Requests and
breach reporting), and demonstrate accountability through appropriate policies,
procedures, and assurance mechanisms.
The report also reflects the Council’s obligations to respond to regulatory oversight
by the Information Commissioner’s Office (ICO), including engagement where
compliance performance falls below expected thresholds. Employment law
considerations arise in relation to training requirements, role responsibilities, and the
management of additional workload associated with SAR handling and information
governance activity, all of which are managed within existing legal and HR
frameworks.
Page 25 of 248

Page 26

In addition, the report acknowledges forthcoming legislative and regulatory change,
including the Data Use and Access Act, which will require ongoing review of policies,
processes, and governance arrangements to ensure continued compliance.
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal
data?
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk
Yes ☐ No ☐
5.6   Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes   ☐ No ☒
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)?
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
The report identifies a number of key risks associated with information governance
and data protection compliance.
The principal risks relate to non-compliance with statutory requirements under the
UK GDPR and Data Protection Act 2018, particularly in relation to timely breach
reporting and Subject Access Request (SAR) performance. Failure to meet statutory
timescales or regulatory expectations could result in increased regulatory
intervention by the Information Commissioner’s Office (ICO), including enforcement
action, reputational damage, loss of public trust, and potential financial penalties.
Page 26 of 248

Page 27

There is also an operational and organisational risk arising from increased demand
for SARs and information rights activity, particularly in high-volume services such as
Social Work. Without effective controls, this could impact service delivery, place
pressure on staff resources, and increase the likelihood of errors or further breaches. 
These risks are assessed and managed through the Council’s established
governance and risk management framework. Information governance risks are
recorded and monitored through relevant Service Risk Registers, with escalation to
the Corporate Risk Register where appropriate. Oversight is provided through the
Data Governance Board, Business Management Team, and Corporate Management
Team, supported by regular performance reporting on breaches, SAR compliance,
and training uptake.
Mitigating actions include strengthened breach reporting and incident response
processes, enhanced monitoring and reporting of SAR performance, clear ownership
and accountability arrangements, targeted training and staff support in higher-risk
service areas, and ongoing review of policies and procedures. Collectively, these
measures provide assurance that risks are actively managed and kept under
continuous review.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 27 of 248

Page 28

Page 28 of 248

Page 29

North Lanarkshire Council Report 
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref REB Date  04/03/26 
Senior Information Risk Owner (SIRO) – Information Governance
– Assurance and Performance Interim Report 
From  Rachel Blair, Chief Officer (Legal and Democratic)  
E-mail BlairR@northlan.gov.uk Telephone 
Executive Summary
This Senior Information Risk Owner (SIRO) report provides assurance to the Finance and
Resources Committee that the Council’s information governance, data protection and
information security arrangements remain effective, proportionate and appropriately
overseen. These arrangements support the Council in meeting its statutory, regulatory and
good practice obligations, while protecting the confidentiality, integrity and availability of
information essential to service delivery and public trust. 
This report covers the interim period from January to March 2025. It has been prepared to
close out reporting under the previous calendar-year SIRO reporting cycle and to support
the transition to annual SIRO reporting aligned to the financial year (April to March), in line
with other corporate governance, risk and assurance reports considered by Committee. 
From April 2025, the statutory role of SIRO transferred from the Chief Officer (Business
and Digital) to the Chief Officer (Legal and Democratic Services), following approval of
governance changes through the One Place, One Plan – Governance Update. This change
strengthens alignment between information governance, legal compliance and corporate
assurance, and future SIRO reports will reflect this revised governance structure. 
The primary purpose of this interim report is to: 
• Provide clear, concise and proportionate assurance across the key areas for which
the SIRO is accountable;
• Confirm whether any material changes to assurance positions arose during the
January–March 2025 period; and
• Provide forward-looking context by summarising known improvements and
developments being delivered during 2025/26, ensuring the report remains relevant
when considered by Committee. 
To support clarity and transparency, the report adopts a structured, assurance-based
approach, presenting the Council’s position through a single consolidated assurance table
at Appendix 1. This approach avoids duplication with detailed operational reporting,
strengthens the line of sight between assurance and risk, and enables Members to readily
understand: 
• What assurance was previously provided;
• Whether that assurance position has changed; and
• What further improvements are being delivered.
Item 4
Page 29 of 248

Page 30

1. Background 
1.1 Information governance and information security responsibilities are distributed across
multiple officers, teams and governance structures within the Council. While specialist
functions provide expertise and operational delivery, effective information governance
relies on strong leadership, clear accountability, robust assurance mechanisms and
consistent organisational compliance. 
1.2 The SIRO acts as the Council’s corporate champion for information governance,
providing senior-level ownership of information risk and assurance to the Corporate
Management Team and the Finance and Resources Committee. This includes
oversight of compliance with data protection legislation, information security standards,
records management obligations and associated risk management arrangements. 
1.3 This report provides the SIRO’s assessment of the Council’s information governance
arrangements for the period January to March 2025, representing an interim assurance
position ahead of the move to annual financial-year SIRO reporting. 
2. Report 
2.1 The Council has well-established information governance, data protection and
information security arrangements, embedded within its wider corporate governance,
risk management and internal control framework. These arrangements are supported
by documented policies and standards, technical controls, mandatory training, and
structured governance oversight. 
Recommendations
It is recommended that Finance and Resources Committee: 
(1) Acknowledge the assurance provided by the SIRO in respect of the Council’s
information governance, data protection and information security arrangements for
the period January to March 2025. ; 
(2) Acknowledge the transition to annual SIRO reporting on a financial-year basis from
2025/26 onwards; 
(3) Endorse the assurance-based reporting approach adopted within this interim report;
and 
(4) Acknowledge that delivery of the Digital North Lanarkshire Programme of Work
continues to provide a significant opportunity to strengthen information governance,
cyber security and data management maturity during 2025/26. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of
Work Statutory / corporate / service requirement
Page 30 of 248

Page 31

2.2 Oversight of information governance continues to be provided through the Data
Governance Board (DGB), which monitors compliance, risk, incidents, improvement
activity and assurance across the organisation. This is supported by specialist
operational teams with responsibility for data protection, cyber security, records
management and digital services. 
2.3 Previous SIRO reports have confirmed that the Council operates at a developing level
of data and information management maturity, with sustained and measurable
improvement achieved over recent years. This has been driven by targeted
investment in systems, strengthened governance, improved training compliance and
increased senior oversight of information risk. 
2.4 To improve transparency, readability and Member assurance, this interim report
presents the SIRO’s assurance through the consolidated assurance table at Appendix
1, covering the key statutory and good-practice areas relevant to the SIRO role. This
includes data protection compliance, cyber security, incident management, risk
management, records management, training and awareness, and corporate
accountability.  
Conclusion 
2.5 Based on the evidence reviewed, the SIRO is satisfied that appropriate and
proportionate information governance, data protection and information security
arrangements were in place during the period January to March 2025.  
2.6 No material deterioration in assurance was identified during this interim period, and no
regulatory enforcement action was taken against the Council. 
2.7 The transition to financial-year SIRO reporting will enable stronger alignment with
corporate planning, risk management, audit and digital transformation activity, and will
allow future reports to provide a more comprehensive, outcome-focused and forward-
looking assurance position. 
3. Measures of success 
3.1  Effective information governance and information security support the Council in
protecting services, finances and reputation. 
3.2 Measures of success include: 
• Continued compliance with statutory and regulatory requirements;
• Sustained or improving assurance positions across all SIRO assurance areas;
• Absence of significant regulatory enforcement or uncontrolled information risk; and
• Demonstrable improvement in maturity, resilience and organisational awareness. 
4. Supporting documentation 
4.1 Appendix 1 SIRO Assurance Summary – January to March 2025. 
Rachel Blair
Chief Officer (Legal and Democratic) 
Page 31 of 248

Page 32

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
This report has legal relevance in that it provides assurance regarding the Council’s
compliance with existing statutory and regulatory requirements relating to
information governance, data protection, records management and information
security. It confirms that appropriate arrangements were in place during the reporting
period and that no regulatory enforcement action was taken, supporting the Council’s
ongoing compliance with its legal obligations. 
The report also reflects a governance change of legal significance through the formal
transfer of the Senior Information Risk Owner role to the Chief Officer (Legal and
Democratic Services), strengthening senior accountability for statutory information
governance responsibilities. The report does not introduce new legal duties,
employment law considerations or legislative changes, and is assurance-based in
nature rather than proposing amendments to the Council’s legal or policy framework. 
Page 32 of 248

Page 33

5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Yes. Information governance and information security present an ongoing corporate
risk to the Council due to the potential impact of data breaches, cyber incidents or
failures in statutory compliance, which could result in service disruption, financial
loss, regulatory action and reputational damage. These risks are formally assessed
and recorded within the Council’s Corporate Risk Register as Information
Governance and Information Security risks, with defined risk owners and agreed
mitigating actions. 
The risks are actively managed through established governance arrangements,
including oversight by the Data Governance Board, implementation of technical and
organisational controls, mandatory training and awareness activity, incident
management processes, and regular assurance reporting to senior management
and Committee. Progress against mitigation actions is monitored on an ongoing
Page 33 of 248

Page 34

basis, with risks kept under review to ensure they remain within the Council’s agreed
risk appetite. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 34 of 248

Page 35

Appendix 1 – SIRO Assurance Summary – January to March 2025 
Area of assurance
Assurance position as at
February 2025 (covering
January–December 2024)
Any subsequent update during
January–March 2025
High-level summary of next
steps being implemented
during 2025/26
Data protection compliance
Effective arrangements in place;
no regulatory enforcement action
by the Information
Commissioners Office (ICO);
breaches managed in line with
statutory requirements.
Breach volumes comparable with
the same period in 2024; no
escalation to ICO enforcement.
Continued strengthening of
accountability, privacy by design
and Data Protection Impact
Assessment (DPIA) processes;
enhanced assurance reporting
through annual SIRO report;
continue to maintain and update
data protection related registers;
annual review of data sharing
agreements.
IT (cyber) security
Compliance maintained with
National Cyber Security Centre
(NCSC) guidance, Public
Services Network (PSN) and
Payment Card Industry Data
Security Standards (PCI DSS);
no material cyber incidents.
No direct impact from national
cyber incidents during this period;
ongoing mitigation of known
vulnerabilities.
Further modernisation of legacy
systems through the Digital North
Lanarkshire Programme of Work;
enhanced vulnerability
management and cloud security
controls. Continue review of
existing disaster recovery plans
and processes; complete review
of identification of critical
systems; development of a
corporate disaster recovery plan,
and improved reporting and
governance; improve and further
develop connection of disaster
recovery arrangements to
business continuity and incident
response arrangements.
Page 35 of 248

Page 36

Area of assurance
Assurance position as at
February 2025 (covering
January–December 2024)
Any subsequent update during
January–March 2025
High-level summary of next
steps being implemented
during 2025/26
Incident management
Clear incident management
processes in place; timely
investigation and remediation of
incidents.
Incident handling remained
effective; lessons learned applied
where appropriate.
Further integration of incident
management with corporate risk
and assurance reporting.
Risk management
Information governance and
information security risks
captured within the Corporate
Risk Register with mitigating
actions identified.
Residual risk position unchanged
during this period.
Continued oversight by the Data
Governance Board (DGB);
alignment with refreshed
corporate risk appetite and
assurance framework.
Records management
Retention schedule in place and
maintained; positive progress
against actions agreed with the
Keeper of the Records of
Scotland.
Delivery of agreed actions
continued as planned.
Completion of remaining
improvement actions and further
embedding of digital records
management standards.
Training and awareness
Mandatory training compliance
significantly improved and within
green RAG thresholds.
Compliance levels maintained
during this period.
Ongoing monitoring and targeted
interventions; refreshed training
content aligned to emerging
risks.
Information Asset Register Core Information Asset Register
in place and maintained.
No material changes during this
period.
Further maturity through
improved ownership, assurance
statements and integration with
system lifecycle management.
Information governance
policies
Policies and standards largely
current and aligned to legislation
and good practice.
Minor updates progressed as
part of routine maintenance.
Planned policy refresh
programme to align with updated
operating model and digital
transformation.
Page 36 of 248

Page 37

Area of assurance
Assurance position as at
February 2025 (covering
January–December 2024)
Any subsequent update during
January–March 2025
High-level summary of next
steps being implemented
during 2025/26
Corporate governance
Information governance
embedded within corporate
governance arrangements and
reporting.
Governance arrangements
remained stable during this
period.
Further alignment with One
Place, One Plan governance
model and committee reporting
cycles.
Accountability
Clear roles defined for SIRO,
Data Protection Officer (DPO),
Information Asset Owners (IAOs)
and operational teams.
SIRO role formally transitioned in
April 2025.
Strengthened senior ownership
and clearer escalation routes
during 2025/26.
Independent assessments /
assurances
Positive external assurance
through PSN compliance and
regulatory engagement.
PSN accreditation remained
valid; no adverse findings.
Continued external assurance
activity; preparation for future
PSN and regulatory
assessments. 
Page 37 of 248

Page 38

Page 38 of 248

Page 39

North Lanarkshire Council
Report
Finance and Resources Committee
Does this report require to be approved?
Ref    JMcK/BF Date
☒ Yes   ☐ No
04/03/26
Procurement Strategy 2026/27  
From James McKinstry, Chief Officer (Assets and Procurement)
E-mail MckinstryJ@northlan.gov.uk Telephone 07939 281 102
Executive Summary
To comply with ‘The Procurement Reform (Scotland) Act 2014’, the council must publish an
annual Procurement Strategy. This proposed “Procurement Strategy 2026/27” (Appendix
1) sets out how the council will conduct procurements between 1 April 2026 to 31 March
2027.
The strategy continues the direction established in previous years but incorporates some
important updates that reflect national policy changes, additional governance arrangements,
and refinements to our procurement objectives.
The key updates include:
• new national reporting requirements under SPPN 1/2026;
• addition of the Cross‑Border Public Procurement (Miscellaneous Amendment)
(Scotland) Regulations 2025;
• enhanced procurement objectives aligned to local and national priorities;
• strengthened content on procurement’s enabling role, including economic challenges,
supply‑chain resilience, climate responsibilities and Community Wealth Building;
• refreshed policy expectations on Community Benefits, Fair Work First, sustainable
procurement, ethical supply chains; and,
• inclusion of the Invest: In North Lanarkshire initiative.
The strategy must be published in an accessible format and shared with Scottish Ministers
following approval.
Recommendations
It is recommended that the Finance and Resources Committee:
(1) Approve the content of this report;
(2) Endorse publication of the Procurement Strategy 2026/27; and
(3) Acknowledge the requirement to share a copy of the approved Procurement Strategy
with Scottish Ministers.
Item 5
Page 39 of 248

Page 40

1. Background 
1.1. As required by the Procurement Reform (Scotland) Act 2014 (the “Act”), the council
must publish a Procurement Strategy and review it annually to ensure continued
relevance. The Procurement Strategy must be published online, and a copy should
be shared with Scottish Ministers. 
1.2. The Act specifies content to be set out within the Procurement Strategy, including: 
• how it links and delivers against local and national priorities;
• how the council shall undertake its regulated procurement and in doing so
satisfy general and specific duties; and,
• it requires the council to make a statement on its general policies and
approach to matters where procurement can influence or support. 
1.3. The Act requires monitoring and reporting on the performance of the Procurement
Strategy, and it prescribes that this should be done through publication of an Annual
Procurement Report. 
1.4. The Act requires the council to ensure that its regulated procurements are carried
out in accordance with legislation and our Procurement Strategy. 
2. Report 
2.1. The current Procurement Strategy 2025/26 was approved by Finance and
Resources Committee 26 February 2025, and remains in effect until 31 March
2026. 
2.2. The national procurement policy team provided feedback on our Procurement
Strategy 2025/26 where a review was undertaken by an independent assessor, who
commented that our procurement strategy was "…well-structured and easy to read,
with a helpful glossary provided to assist the reader. The strategy shows strong
evidence of how North Lanarkshire Council has complied with the general duties
and sustainable procurement duties. There are many examples of how procurement
opportunities have been opened up to SMEs, supported businesses and third
sector bodies." 
2.3. The proposed Procurement Strategy 2026/27 continues the direction established in
previous years but incorporates some important updates that reflect national policy
changes, additional governance arrangements, and refinements to our procurement
objectives and ongoing improvement activity. 
2.4. In accordance with the Scottish Government’s procurement policy note SPPN
1/2026, Procurement Strategy 2026/27 acknowledges the updated requirement for
publishing and the revised reporting metrics mandated for Annual Procurement
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Page 40 of 248

Page 41

Reports in 2026/27. The council’s procurement toolkit, including tender documents,
will be updated to ensure all measures can be tracked and reported on. 
2.5. In Section 3 Governance for Procurement Activity we have added the Cross-Border
Public Procurement (Miscellaneous Amendment) (Scotland) Regulations 2025, that
explain which procurement rules apply when Scottish public bodies and UK public
bodies buy goods or services through each other’s contracts or frameworks. 
2.6. The procurement objectives in Section 5 have been revised to more clearly
articulate the council’s commitment to best value, capability development,
transparency, improved supplier participation, and alignment with local and national
priorities. 
2.7. We have updated the policy on Community Benefit requirements (Section 9.4),
providing more focus on targeted social and economic benefits for the council.
There is more detail on the council’s procedures pre- and post-tender, including
managing the delivery of Community Benefits. 
2.8. In Section 10 we have incorporated the Invest In North Lanarkshire initiative, which
is linked to the Plan for North Lanarkshire. 
2.9. The full Procurement Strategy 2026/27 is included at Appendix 1 of this report, and
covers the period 1 April 2026 to 31 March 2027. 
3. Measures of success 
3.1  Procurement Strategy 2026/27 fully complies with the legislative requirements of the
Procurement Reform (Scotland) Act 2014 and SPPN 1/2026. 
4. Supporting documentation 
4.1  Appendix 1 – Procurement Strategy 2026/27 
James McKinstry
Chief Officer (Assets and Procurement) 
Page 41 of 248

Page 42

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Procurement Strategy 2026/27 sets an overarching approach for undertaking
regulated procurements; from this we have embedded considerations into the
regulated procurement toolkit and procedures to help procuring services areas
comply with national policies on:
• Equality Duty - https://www.gov.scot/policies/public-sector-
procurement/procurement-equality-duties/; and
• Fair Work First - https://www.gov.scot/publications/publication-of-updated-fair-
work-first-in-procurement-guidance/ 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
The Procurement Strategy 2026/27 sets an overarching approach for undertaking
regulated procurements; each individual procurement undertaken will have its own
review of Financial Impacts. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Procurement Strategy 2026/27 sets an overarching approach for undertaking
regulated procurements and sets out the governance for procurement activity that
need to be considered in each individual procurement. 
Page 42 of 248

Page 43

5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Procurement Strategy 2026/27 sets an overarching approach for undertaking
regulated procurements; from this we have embedded considerations into the
regulated procurement toolkit and procedures to help procuring services areas
comply with national policies on:
• Sustainable Procurement Duty per the requirements of the Procurement
Reform (Scotland) Act 2014;
• guidance on climate change and circular economy
https://www.gov.scot/publications/public-procurement-taking-account-of-
climate-and-circular-economy-considerations-3-2022/; and 
• the Council’s Environmental Pathway 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Procurement Reform (Scotland) Act 2014 requires monitoring and reporting on
the performance of the procurement strategy, and it prescribes that this should be
done through publication of an Annual Procurement Report. The Procurement
Strategy 2026/27 must also be published online, accessible by the public. 
Page 43 of 248

Page 44

5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The risks associated to governance of the council’s procurement strategy and
procedures are managed at a corporate level. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 44 of 248

Page 45

APPENDIX 1 – Procurement Strategy 2026/27 
GLOSSARY
“Community Benefits” are requirements built into a contract which deliver wider social,
economic or environmental benefits beyond the primary purpose of the goods, works or
services being procured. These may include, but are not limited to, job creation, training and
development opportunities, supply‑chain initiatives, and activities that support community
regeneration. 
“Contractor” any organisation that provides Supplies, Works, or Services to the Council or
on behalf of the Council. 
“Economic Operators” are defined in The Act, means any person who offers the execution
of works, the supply of products or the provision of services on the market 
“LGBF” is a high-level benchmarking tool designed to support senior management teams
and elected members to ask questions about key council services. 
“Living Wage” an independently calculated rate based on the cost of living and is paid
voluntarily by employers. The rate is calculated each year in November by The Resolution
Foundation on an analysis of the wage that employees need to earn to afford the basket of
goods required for a decent standard of living. This basket of goods includes housing,
childcare, transport, and heating. The Real Living Wage is different to the UK government’s
National Living Wage which is not calculated according to what employees need to live on. 
“Procurement” the tasks and decisions which secure an external Contractor to provide what
we want, at a price that we can afford. Activity is focused on the period from prior to
advertising a tender to signing the contract. It includes both competitive tenders and
circumstances where we negotiate with a single Contractor. 
“Regulated Procurements” refers to any Procurement: above £50,000 for Supplies or
Services; and above £2,000,000 for Works. 
“Scotland Excel” is the national centre of expertise for local government procurement;
responsible for collaborating with Scottish councils to improve procurement performance and
practice, and the lead buying authority for a range of national collaborative procurement
frameworks. 
“Services” are those services that we buy including specialist support for vulnerable
children and adults, and repairs and maintenance services, financial advice, designs, and
surveys for new building works. 
“Single Procurement Document” / “SPD” - means the Single Procurement Document
referred to in the Public Contracts (Scotland) Regulations 2015. It is a standard questionnaire
the council use in higher and lower threshold regulated procurements to allow the council to
identify suitably qualified and experienced bidders. It contains questions on both exclusion
and selection criteria. Bidders will use their SPD response to indicate whether they can meet
the requirements of the procurement. 
“SME or Small and Medium Enterprises” defined by the number of employees whereby
micro is 9 or fewer, small is 10-50, medium is 51-250. 
Page 45 of 248

Page 46

“SPPN” abbreviation of ‘Scottish Procurement Policy Note’ these are the messages from the
Scottish Government’s procurement policy team, providing advice to public bodies on
procurement policy. 
“Supplies” items that we buy, such as pens and paper, or plants and seeds, or fruit and
vegetables. 
“Supplier Development Programme” is a public sector organisation who offer expert
training, support and information to businesses develop and compete for Contracts. 
“Supported Business” as defined in the procurement regulations, means an economic
operator whose main aim is the social and professional integration of disabled or
disadvantaged persons and where at least 30% of the employees of the economic operator
are disabled or disadvantaged persons. 
“Sustainable Procurement” is a process whereby organisations meet their needs for
Supplies, Services and Works in a way that achieves value for money and generates
benefits, not only for the organisation but also to wider society, the economy, and the
environment. 
“Third Sector” is the group name for a range of organisations including community groups,
charities, voluntary organisations, faith groups, social enterprises, community interest
companies. Third sector organisations may be registered charities and may be registered
companies. They include small, local groups and large multinational operations, and
everything in between. 
“Value for Money” – achieving the best balance between cost, quality, and sustainability. 
“Works” is the construction works that we buy, including construction of new buildings, or
extensions, and creation and improvements to roads and bridges and open spaces. 
Page 46 of 248

Page 47

1. INTRODUCTION 
1.1 North Lanarkshire Council (“the council”) is a unitary authority, the fourth largest in
Scotland, and is responsible for the delivery of a wide and diverse range of statutory
and discretionary public services. 
1.2 The council deliver services through a mixed economy acting as both:
• a provider through direct provision of services using its own workforce and
assets; and,
• an enabler with services delivered under commercial arrangements by private
Contractors, the Third Sector and Supported Businesses. 
1.3 During the financial year 2024/25, the council spent £706 million (excluding VAT) on
goods, services and works to support operations and deliver public services. 
1.4 In Scotland, public bodies with an annual procurement spend of £5 million or more
are required by legislation to prepare and publish a procurement strategy or revise
an existing strategy under the Procurement Reform (Scotland) Act 2014 (“the Act”). 
1.5 The council has prepared and published Procurement Strategies since 2017 in
conformance with the requirements of the Act; the most recent publication was
Procurement Strategy 2025/26. 
1.6 This document outlines the continuation of the existing procurement strategy with
some refinements to produce our new Procurement Strategy 2026/27 which shall
cover the period 1 April 2026 to 31 March 2027. 
1.7 The Act requires a public body which is obliged to prepare or revise a procurement
strategy:
• to ensure that its regulated procurements in that year are, as far as reasonably
practicable, carried out in accordance with its procurement strategy; and,
• to publish an Annual Procurement Report as soon as reasonably practicable
after the end of that financial year, but no later than six months after, with
specific means to report its performance against the procurement strategy
amongst other requirements. 
1.8 In accordance with the Scottish Government’s procurement policy note SPPN
1/2026, this Procurement Strategy acknowledges the updated requirement for
publishing procurement strategies and the revised reporting metrics mandated for
Annual Procurement Reports in 2026/27.  
Page 47 of 248

Page 48

2. PRIORITIES AND THE ROLE OF PROCUREMENT
2.1 Local Priorities
2.1.1 In North Lanarkshire, we are making progress to transform and regenerate towns;
develop high-quality, sustainable housing; create bold, dynamic, flexible places to
learn and work; and create an enviable infrastructure and suitable conditions that
drives investment, growth, and prosperity. 
2.1.2 The Plan for North Lanarkshire (“the Plan”) sets out our shared ambition for
inclusive growth and prosperity for all, with a fairer distribution of wealth across all
local communities. 
2.1.3 Our vision is for North Lanarkshire to be the place to: Live; Learn; Work; Invest; and
Visit. 
2.1.4 The Plan sets out five priorities, providing focus for activities and resources:
• Improve economic opportunities and outcomes.
• Support all children and young people to realise their full potential.
• Improve the health and wellbeing of our communities.
• Enhance participation, capacity, and empowerment across our communities.
• Improve North Lanarkshire’s resource base. 
2.1.5 We have twenty-five high level ambition statements that collectively support the
shared ambition, and these are aligned to our five priorities. 
2.1.6 A five year Programme of Work (for period 2023-2028) was put in place, setting
seven workstreams to support of The Plan. Each workstream has project boards
headed by our most senior leaders to keep activities aligned and on track. 
2.1.7 The council’s procurement function is seen as an enabler to all aspects of The Plan
as we ensure each regulated and significant procurement undertaken corresponds
to one of the priorities, an ambition statement, and to a workstream; these become
embedded within contract strategies, specifications and form part of tender
evaluation. 
2.1.8 Our Capital Investment Programme, includes major projects such as Town Centre
Regeneration, New-build homes, Community Hubs, and Active Travel – each of
these projects will require a number of procurements as they progress, and
therefore this Procurement Strategy, the governance it sets out, the specific
Procurement Toolkit and Procedures covered within are all relevant to our council’s
journey. 
2.1.9 The outputs and achievements of each completed procurement are reported with
reference to a priority, ambition and workstream, and set out how the procurement
has achieved value for money, and delivered against relevant economic, social, and
environmental objectives. 
2.2 National Priorities
2.2.1 The national priorities, captured more fully in the National Outcomes, has the
objectives to create a more successful country, with opportunities for all of Scotland
to flourish, through increased wellbeing, and sustainable and inclusive economic
growth.
Page 48 of 248

Page 49

2.2.2 Recognition for public sector procurement is given as it is seen as "...vitally
important to public services, businesses and communities alike. If we are to deliver
sustainable economic growth, it is essential that we continue to use the power of
public spending to deliver greater public value, drive efficiencies and help public
bodies achieve their overarching purpose and strategic objectives. Smart use of
procurement can play a key role in building a more prosperous and fairer Scotland
by promoting jobs and growth; encouraging innovation; boosting training,
apprenticeship, and employment opportunities; and helping businesses, particularly
small and medium sized enterprises (SMEs), third sector bodies, and supported
businesses to compete effectively for contracts.". 
2.2.3 The first procurement strategy for Scotland, Public Procurement Strategy for
Scotland 2023 to 2028, was published by the Scottish Government in April 2023 and
seeks all public bodies to align with it. 
2.2.4 The procurement strategy for Scotland confirms the need for public bodies to
contribute against the National Performance Framework, comply with the legislative
procurement duties, and to utilise the national procurement policies and guidance
which underpin good procurement practice. 
Page 49 of 248

Page 50

3. GOVERNANCE FOR PROCUREMENT ACTIVITY
3.1 Regulations
3.1.1 The regulations applicable to our procurement activity derived from European Union
Directives, and were transposed into Scots law as follows:
• the Public Contracts (Scotland) Regulations 2015;
• the Utilities Contracts (Scotland) Regulations 2016; and
• the Concessions Contracts (Scotland) Regulations 2016. 
3.1.2 These regulations ensure that public purchases are made in a transparent and fair
manner, seeking to achieve efficiency in public spending while facilitating the
participation of SMEs, third sector bodies and supported businesses. 
3.1.3 In December 2025, the Cross-Border Public Procurement (Miscellaneous
Amendment) (Scotland) Regulations 2025 were introduced; these Regulations
explain which procurement rules apply when Scottish public bodies and UK public
bodies buy goods or services through each other’s contracts or frameworks. They
clarify when Scottish procurement law applies, when UK procurement law applies
under the Procurement Act 2023, and prevent both sets of rules applying at the
same time. 
3.2 Legislation
3.2.1 The Procurement Reform (Scotland) Act 2014 works alongside the regulations and
is the legislation that governs how Scottish public bodies buy their goods, services
and works, providing a national legislative framework for sustainable public
procurement that supports Scotland’s economic growth through improved
procurement practice. 
3.2.2 The Act focuses on several general duties on contracting authorities regarding their
procurement activities and some specific duties aimed at promoting good,
transparent, and consistent practice in procurement processes. 
3.2.3 Further provisions under the Act are made through the Procurement (Scotland)
Regulations 2016. 
3.3 General Contract Standing Orders
3.3.1 The Local Government (Scotland) Act 1973 section 81 requires local authorities to
“…make standing orders with respect to the making by them or on their behalf of
contracts for the supply of goods or materials or for the execution of works”. 
3.3.2 Our General Contract Standing Orders (“GCSOs”) set out the council’s specific
procurement procedures and responsibilities at all spend levels, covering both
regulated and non-regulated approaches. GCSOs include our reporting
requirements of procurement activity, including authorisation of contracts awards. 
Page 50 of 248

Page 51

4. REQUIREMENTS OF THE PROCUREMENT STRATEGY SET BY THE ACT 
4.1 In accordance with section 15 of the Act, the procurement strategy must detail how
the council intends to carry out its regulated procurements and in particular:
(a) set out how the council intends to ensure that its regulated procurements will:
(i) contribute to the carrying out of its functions and the achievement of its
purposes;
(ii) deliver Value for Money; and
(iii) be carried out in compliance with the general duties reference in section
8 of the Act to; treat Economic Operators equally and without
discrimination, act in a transparent and proportionate manner, and to
comply with the Sustainable Procurement Duty. 
(b) include a statement of the council’s general policy on:
(i) the use of community benefit requirements;
(ii) consulting and engaging with those affected by its procurements;
(iii) the payment of a living wage to persons involved in producing, providing,
or constructing the subject matter of regulated procurements;
(iv) promoting compliance by contractors and sub-contractors with the
Health and Safety at Work etc. Act 1974 (c.37) and any provision made
under that Act; and
(v) the procurement of fairly and ethically traded goods and services. 
(c) include a statement of the council's general policy on how it intends its approach
to regulated procurements involving the provision of food to:
(i) improve the health, wellbeing, and education of communities in the
authority's area; and
(ii) promote the highest standards of animal welfare. 
(d) set out how the authority intends to ensure that, as far as reasonably
practicable, the following payments are made no later than 30 days after the
invoice (or similar claim) relating to the payment is presented - 
(i) payments due by the authority to a contractor
(ii) payments due by a contractor to a sub-contractor
(iii) payments due by a sub-contractor to a sub-contractor 
4.2 The council must have regard to further orders and/or guidance issued by Scottish
Ministers. 
Page 51 of 248

Page 52

5. PROCUREMENT STRATEGY 2026/27
5.1 Procurement Strategy Objectives
5.1.1 This procurement strategy should:
• support delivery of the council’s local and national priorities;
• confirm that our procurement toolkit and procedures, complemented by
national tools and guidance, are designed to deliver best value while providing
assurance of regulatory and legislative compliance;
• showcase our effective procurement function with strong leadership buy-in
and a talented network of procuring officers supported through training and
continuous professional development;
• provide assurance that our monitoring, reporting and analysis inform
continuous improvement in procurement practice;
• outline our commitment, where relevant, to work with and involve those
affected by our procurements;
• ensure that through robust contract award procedures, we appoint Contractors
who share our vision and can help deliver the council’s priorities and
ambitions; and,
• demonstrate transparency and fairness in our procurement approach,
encouraging interest and participation from businesses of all types and sizes
to strengthen competition and secure the best possible outcomes from
regulated procurement. 
5.2 Alignment with National Procurement Strategy
5.2.1 This procurement strategy ensures that the council remains aligned to the Public
Procurement Strategy for Scotland (“PPSfS”), which establishes a single vision for
public procurement and identifies four key enablers that support delivery:
• Procurement Capability – developing people, skills and leadership across the
procurement community.
• Supplier Development – strengthening supply chains and supporting suppliers
to meet public sector requirements.
• Engagement – improving consistency in processes and tools to benefit both
buyers and suppliers.
• Collaboration – promoting strong relationships and shared working towards
common goals. 
5.2.2 The council recognises these enablers and has embedded them within our
procurement approach and governance arrangements as detailed throughout this
strategy. 
5.2.3 As highlighted in the Scottish Government’s review of the PPSfS two years on (May
2025), a suite of eight national Key Performance Indicators (KPIs) has now been
introduced to measure progress against the strategy’s vision and demonstrate the
value and impact of procurement activity across Scotland. The council will provide
relevant procurement and associated data to support this national baseline and
ongoing measurement. 
Page 52 of 248

Page 53

6. THE COUNCIL’S PROCUREMENT FUNCTION
6.1 Importance
6.1.1 The council are responsible for a broad range of statutory and vital public services,
requiring each responsible Service Area to seek tailored procurement advice and
support to help them achieve their service and/or programme of work objectives,
often against a hard economic and unpredictable commercial landscape. 
6.1.2 Having an effective procurement function, directed by a procurement strategy, is
deemed essential to the council, with our procurement professionals on hand to give
advice to our leaders supporting their most strategic decisions, by challenging the
thinking, by developing options, and pursuing innovative and outside-the-box
solutions to overcome challenges and barriers. 
6.1.3 Procurement activity features in the council’s top 25 areas of corporate risk, and as
such, there is a high-level awareness of procurement across the council’s corporate
management team. 
6.1.4 The main mitigation of procurement risk lies within having controls implemented
across the procurement function, including people and process. Procurement must
be carried out in compliance with the governance of procurement activity outlined at
section 3 herein, making it important to have an approved procurement toolkit
underpinned with guidance, policy and procedures, and an effective group of
procurement professionals able to conduct procurements. 
6.1.5 In recent years, the public sector has faced significant challenges arising from
Brexit, the COVID‑19 pandemic, and global conflicts. These events have disrupted
supply chains, created economic instability, and introduced new risks to the reliable
and affordable delivery of public services. 
6.1.6 During the pandemic, the procurement function played a critical role, rapidly
sourcing essential goods and services to support first responders and front‑line
operations. 
6.1.7 Looking ahead, the council’s procurement function will continue to act as a key
enabler in delivering the Plan for North Lanarkshire, supporting priority outcomes
through:
• Social and Economic Impacts – promoting Fair Work First, securing
Community Benefits, and supporting job creation and Community Wealth
Building; and
• Environmental Outcomes – using procurement levers to reduce emissions,
protect local habitats, and strengthen climate resilience. 
6.1.8 Our procurement professionals act as trusted ambassadors for the council,
representing us through external networking and building constructive relationships
with peers across other public bodies. 
6.1.9 They also serve as our key interface with the external marketplace, managing
enquiries and leading or supporting events and initiatives that stimulate supplier
interest, support contractor development, and contribute to stronger competition. 
Page 53 of 248

Page 54

6.2 Leadership
6.2.1 The procurement function has a prominent place in the hierarchy of the council’s
leadership model, whereby overall governance and strategic procurement
responsibility resides with the Chief Officer (Assets and Procurement). The Chief
Officer has a direct channel of engagement with the council’s: Chief Executive;
Councillors; Corporate Procurement Working Group (“CPWG”); and Procurement
and Support Manager who in turn manages the Corporate Procurement Team
(“CPT”). 
6.2.2 Throughout the year, the Chief Executive, Chief Officer (Assets and Procurement)
and Procurement and Support Manager have engagement and participation with
strategic procurement leaders across the ‘procurement network’ including
government, national bodies, local authority peers, collaborative partners, and other
professional agencies. Relative and comparable relationships exist and are
encouraged at all levels up and down the council’s procurement function as we
embrace procurement opportunities that can be gained through collaboration,
networking, and partnership. 
6.3 Devolved Procurement Model
6.3.1 The council operate a devolved procurement function, including:
• the corporate procurement team comprising category managers and
procurement officers, who have the predominant remit to support Service
Areas with their strategic and regulated procurements (acting as the procuring
officer), and management and maintenance of the council’s procurement
registers and procurement toolkit; and,
• an extension of officers across the Service Areas with various levels of
procurement expertise and involvement, some are delegated responsibility to
perform a procuring officer role to undertake a mix of regulated and non-
regulated procurements, and some are assigned contract management
responsibilities. 
6.3.2 All procurement is: undertaken in compliance with the governance of procurement
activity; has regard to the local and national priorities; and can be linked to a
category management approach. 
6.4 Category Management
6.4.1 The council has a category management approach, which allows a commercially
focused overview of the aggregate council expenditure, with tiered segmentation
into common categories of spend, broken down further into commodity groups and
down again into specific individual contract requirements. 
6.4.2 CPT consolidates and uploads the council’s spend data recorded periodically to a
national online spend platform, which analyses and tags our data into various
helpful spend classifications and groupings, readying it for further segmentation and
detailed analysis. 
6.4.3 Segmenting our spend into high level categories provides intelligence, particularly
as we drill down the category into commodity groupings, showing us patterns of our
wider procurement needs, and the range of known Contractors used in each.
Furthermore, the category view helps to inform strategic procurement, identifying
opportunities to take advantage of, such as by consolidating some requirements we
Page 54 of 248

Page 55

can streamline the number of procurements undertaken improving efficiency, but
also achieving better value through economies of scale savings. 
6.4.4 All categories work to common principles and rules. Under our category
management approach, the council’s toolkit blended with the online sustainable
procurement tools support prioritisation, life‑cycle mapping and sustainability
assessments, helping to identify the measures most relevant to each category.
These can then be incorporated into individual Contract Strategies, enabling
procuring officers and service leads to make timely and well‑informed procurement
decisions. 
6.4.5 The Category Strategy provides high‑level governance and guidance, allowing
procuring officers to adopt established measures into individual Contract Strategies,
including sustainable procurement duty, equality duty, supported business
involvement, and actions to support our Environmental objectives. 
6.5 CPWG
6.5.1 The CPWG comprises a small number of Chief Officers and representatives with
interest and skills to review, provide oversight, and assist in strategic decisions on
matters pertaining to the council’s procurement function. The CPWG meet quarterly
and provide helpful influence securing council-wide buy-in and promoting the
procurement strategy and procedures. 
6.6 Network of Procuring Officers
6.6.1 The council’s internal procurement network is a forum for procuring officers across
the council, with devolved procurement responsibilities or associated procurement
roles (contract managers, evaluation managers, service experts), to collaborate on
procurement practice. 
6.6.2 We use internal communication channels to provide access to procurement toolkits,
template documents and share communications (guidance notes, policy updates
etc.). These channels function as a repository for sharing examples of best practice
and lessons learned. 
6.6.3 The procurement network promotes opportunities for mentoring and job shadowing
as a mean of developing officers and allowing skills transfer. It is a future priority to
develop this network further to advance specific procurement practice, deliver
essential and bespoke training suited to the individual officer and their service
procurement requirements. Like the national procurement strategy, we also
recognise our people as enablers of effective procurement. 
6.7 Procurement Training
6.7.1 It is necessary that we have a checklist, indicating the awareness and training
needs required for procuring officers and supporting roles (service leads, contract
managers or contract administrators, evaluation managers and evaluators), and this
features in the current procurement improvement programme. 
6.7.2 Particularly for procuring officers, we need to ensure officers are aware and trained
on:
• the internal procurement toolkit and procedures;
Page 55 of 248

Page 56

• the governance of procurement;
• sustainable procurement duty;
• the online sustainable procurement tools; 
• Fair Work First approach; and,
• Climate Duty. 
6.7.3 The national procurement competency framework is utilised to help officers self-
appraise their existing competencies and identify areas to be worked on and/or
assist with their continuous professional development (“CPD”). 
6.7.4 There is a commitment to the development of our procurement network to maintain
and raise standards across the procurement function. 
6.7.5 We encourage professional qualification through the Chartered Institute of
Purchasing and Supply “CIPS” which is the professional body for procurement.
CIPS members can benefit by participating in CIPS run tutorials, webinars and a
range of other CPD opportunities. Learning and experience gained by our officers
who are CIPS members adds value and benefit where the learning can be
integrated and/or adopted within the council’s procurement function and approach. 
6.7.6 We also encourage and have interest in participation with external programmes
and/or groups, such as Procurement People of Tomorrow (PPoT), to improve the
procurement and commercial skills of our officers and future talent. 
Page 56 of 248

Page 57

7. THE COUNCIL’S PROCUREMENT TOOLKIT AND PROCEDURES FOR 2026/27
7.1 Overview of Procurement Toolkit and Procedures
7.1.1 The council have a comprehensive procurement toolkit and supporting procedures,
maintained by CPT and mandated through the council’s GCSOs. These are
continuously under review and development, and in place to ensure a consistent
approach to regulated procurement activity, ensuring compliance with the
governance of procurement, the associated general and specific duties, and
mitigating procurement risks. 
7.2 Forward Procurement Plans
7.2.1 The CPT work closely with service areas to consider new and recurring
procurement requirements and from this can establish forward procurement plans
which are essential for resource allocation and planning of procurement activity. 
7.2.2 The forward procurement plans are consolidated, and those above the relevant
procurement thresholds are published within the council’s Annual Procurement
Report which lists the expected regulated procurements to be undertaken in the
next two financial years, providing transparency for prospective Contractors
interested in doing business with the council. 
7.3 Contract Strategy
7.3.1 An internal Contract Strategy is the main pre-tender document from the
procurement toolkit, required to be produced for all regulated and significant
procurements. 
7.3.2 The Contract Strategy may derive from an established Category Strategy, through
inheriting any high-level practice and decisions, such as identified sustainable
procurement measures, that should be incorporated into the planned procurement. 
7.3.3 The Contract Strategy can also be written bespoke and/or deviate from the
Category Strategy as required to meet particular contract objectives. 
7.3.4 Each Contract Strategy should be tailored to reflect and achieve: the service area
and/or stakeholder needs; the level of competition in the marketplace; and the
choice of procurement procedure and agreement type to ensure optimum
competition with objective to achieve the desired quality outcomes and best value. 
7.3.5 The Contract Strategy will link the procurement to the local and national Priorities
helping the procuring officers focus on setting the desired procurement objectives. 
7.3.6 This internal document has a key purpose in ensuring the preparation for
procurement is made in compliance with the governance of procurement activity.
The format of the contract strategy is structured with checkpoints and
considerations, including but not limited to:
• risk and opportunity assessment;
• consideration for sustainable procurement duties, and for those identified, what
is needed in the tender approach to achieve these targets;
• how we can influence and encourage Contractors to support the Procurement
Priorities, including Fair Work practices, reduction of waste and carbon
emissions;
Page 57 of 248

Page 58

• establish relevant targets for Community Benefits for the procurement, such as
job creation, training, and use of sub-contractors;
• make or buy decisions, and consideration of the circular economy;
• decision on procurement route with consideration given to the potential to
reserve opportunities for supported businesses where it is identified they can
fulfil the requirements;
• applying measures to reduce inequality and facilitate the involvement of SMEs,
third sector bodies and supported businesses;
• encouraging innovation per guidance in SPPN 3/2023; 
• consider how to involve those who may be affected by the procurement;
• setting the evaluation criteria; and
• capture key decisions. 
7.3.7 Contract Strategies are required to be authorised in accordance with GCSOs before
the associated procurement progresses to competition. 
7.4 Tender Packs
7.4.1 CPT have established tender packs for all types of regulated procurements the
council may undertake, this ensures a consistent approach for procuring officers
and for potential contractors. A key feature of the tender pack is the council’s
standard terms and conditions applicable in all contracts, which incorporates
requirements set by the Act and the mandated clauses from policy guidance SPPN
2/2022 - prompt payment in the supply chain. 
7.4.2 Each tender pack will have a clear ‘conditions of participation’ and outline any
selection and award criteria; this provides transparency and clearly informs those
expressing interest and/or planning to tender the council’s rules and protocols for
tendering, how tenders will be checked and evaluated, and the tender opening
procedures (these are also covered in GCSOs). 
7.4.3 A template quality questionnaire has been created with considerations and a choice
of questions to capture tenderer feedback on key areas of impact that are important
to the council, including: equality duty and fair work; community benefits and social
value; net zero; data protection and cyber security. 
7.5 Tendering
7.5.1 The council’s tendering approach for regulated procurements is generally conducted
through the national platforms:
• Public Contracts Scotland Portal (“PCS”); and
• PCS-Tender (“PCS-Tender”). 
7.5.2 These tender platforms ensure consistency for prospective contractors and provide
transparency, administer questions and answers during the tender process, manage
tender deadlines, and facilitate a sealed-bid approach where the tender post-box
remains locked to ensure any bids received cannot be opened until the deadline has
passed. Each system has its own independent helpdesk with both telephone
support and a catalogue of guides. 
7.5.3 Exceptions to using the above platforms may be required for bespoke procurement
exercises or when we are conducting a call-off from a third-party framework or
Page 58 of 248

Page 59

dynamic purchasing system (“DPS”) and its either mandatory or beneficial to use
their platform. 
7.6 Tender Evaluation
7.6.1 In each individual procurement, a tender evaluation manager and team of
evaluators are identified when finalising the contract strategy. 
7.6.2 Prior to receiving any tender submissions, all officers and individuals involved in
tender evaluation must complete a conflict of interest declaration and a
confidentiality statement; these requirements safeguard the integrity of the
evaluation process and provide assurance that decisions are taken impartially,
transparently, and without undue influence or risk of information misuse. 
7.6.3 The tender evaluation manager is responsible for any clarification requirements and
consolidating evaluation scores and result. 
7.7 Contract Award Reports
7.7.1 Contract award reports are the main post-tender document from the procurement
toolkit, used internally to detail the scoring and finalised results of tender evaluation. 
7.7.2 Contract award reports will summarise the key outcomes in a procurement, from
savings to benefits captured, while also explaining how best value has been
achieved. 
7.7.3 The Chief Officer of the Procuring Service is required to approve contract award
reports, and where applicable, seek Committee approval in accordance with the
procedures set out in GCSOs. 
7.7.4 As soon as the relevant approval(s) are given for the contract award report, the
procurement can proceed to the stage of finalising the contract award by formal
communication of the result with the candidates and tenderers. 
7.8 Notices of Decisions
7.8.1 The procurement toolkit has letter templates that the procuring officer will use to
explain the procurement outcome following the conclusion of the respective stage of
a procurement, informing candidates or tenderers with the required feedback under
the relevant governance of the procurement. 
7.8.2 Depending on the contract award value and in accordance with the procedures set
out in GCSOs, letters will be issued under the approval of either the Chief Officer
(Assets and Procurement) or the Chief Officer of the procuring service area. 
7.8.3 Where required, the procuring officer will close the procurement process by
publishing a contract award notice. 
7.9 Contract Register
7.9.1 The council has a publicly accessible online contract register contained within PCS
which is auto-populated on publication of contract notices, with further monitoring
and maintenance of the register undertaken by CPT.
Page 59 of 248

Page 60

7.10 Contract Management
7.10.1 The council is required to have robust contract management arrangements in place,
particularly for its most strategic contracts to ensure the council works effectively
and professionally with the appointed contractors. 
7.10.2 Any key performance indicator and/or services levels must be considered during
development of contract strategy and carried forward into the tender pack. 
7.10.3 Each contract we enter should be formed based on the council’s tender pack,
comprising:
• the specification of requirements;
• key performance indicators (KPIs) and/or expected service levels;
• general conditions of contract (and if applicable, special terms and conditions);
• the accepted tenderer proposals, method statements and pricing; and
• any other pertinent detail captured and written into the final contract award
letter. 
7.10.4 It is important that each contract is managed in compliance with the council’s
GCSOs and in conformance with the contract award letter (to ensure that the
expected performance and outcomes are achieved. 
Page 60 of 248

Page 61

8. MONITORING AND REPORTING
8.1 Annual Procurement Report
8.1.1 An Annual Procurement Report will be produced by the council as soon as possible
after the financial year and used to report the performance and effectiveness of the
respective Procurement Strategy. 
8.1.2 The Annual Procurement Report will be produced in conformity to the Act and utilise
the recommended reporting template provided through the national policy note i.e.
SPPN 1/2026  which aims to ensure consistent reporting from all public bodies. The
report measures what we have achieved in our contract awards, including:
• Number of Regulated procurements;
• Compliance with Procurement Strategy;
• Community Benefits accrued;
• Appointed Contract status with Fair Work and the Real Living Wage;
• Payment Performance;
• Supported Business; and,
• Total Spend and Savings. 
8.1.3 The data sources for the above information include payments made through the
council’s financial system; data gathered through the procurement registers
managed by CPT; and the outputs from the national online spend platform (as
mentioned at 6.4.2 herein). 
8.1.4 To finalise the production of the Annual Procurement Report, prior consultation and
approval will be sought from the CPWG members, committee, and the Chief Officer
(Assets and Procurement). The Annual Procurement Report will be published in an
accessible format on the council’s website (link to published Annual Procurement
Reports) and a copy will be shared with Scottish Ministers. 
8.2 Local Government Benchmarking Framework (“LGBF”)
8.2.1 The council contribute to the national reporting metrics and indicators, which
includes a procurement measure attached to the focus area of Economic
Development:
• Proportion of procurement spent on local enterprises. 
8.2.2 Data to produce this metric will be the same sources mentioned at 8.1.3 above. 
8.2.3 This metric will be published in an accessible format on the LGBF website. 
8.3 The Council’s Strategic Performance Framework
8.3.1 The council use a platform of performance metrics in all services to keep track and
focus of how each service and team are performing, these are:
• Procurement spend - % through collaborative contracts with other publicly
funded bodies.
• Procurement spends - % with contracted suppliers.
• Procurement contracts - % qualifying contracts >£1m containing a community
benefit requirement.
• Procurement contracts - % qualifying contracts awarded to clients who meet
fair work criteria.
Page 61 of 248

Page 62

• Procurement assessment score - procurement and commercial improvement
programme (PCIP)
• Procurement contracts - % qualifying contracts in reporting period to local
organisations
• Procurement contracts - % qualifying contracts in reporting period to small
medium enterprises
• Procurement spend - % awarded to local organisations. 
• Procurement spend - % with small medium enterprises. 
8.3.2 Data to produce these metrics will be gathered from the same sources as 8.1.3
above. 
8.3.3 These metrics will be reported annually by the Chief Officer (Assets and
Procurement) to the relevant council committee. 
8.4 Audits
8.4.1 The council’s Internal Audit department provides independent and objective
assurance to the council's senior management that systems and controls are fit for
purpose. The most recent audits related to Procurement were focussed on:
• Contract and supplier management; and,
• Procurement – Best Value Approach. 
8.4.2 These audits are welcomed to provide critical review and recommendations, adding
focus for procuring officers and sharpening the procurement toolkit and procedures. 
8.4.3 Progress on actions arising from audits are reported to the council’s audit and
scrutiny panel, which ensures continuous management until the actions are
completed. 
8.5 Procurement and Commercial Improvement Programme (“PCIP”)
8.5.1 The council is committed to improving procurement performance and practice of its
overall procurement function, therefore we feel it is essential to participate in the
National PCIP assessments. 
8.5.2 Local Authority PCIP assessments are conducted by Scotland Excel, usually every
two years. 
8.5.3 Following each assessment, Scotland Excel provide the council with a formal output
report, outlining what has been identifies as strengths and areas where the council
have scope for improvement. 
8.5.4 The council has undergone three PCIP assessments in 2017, 2019 and 2024. 
8.5.5 The council’s 2024 PCIP assessment report supports continuous improvement of
the procurement function as covered in each Procurement Strategy. 
Page 62 of 248

Page 63

9. PROCUREMENT STRATEGY 2026/27 GUIDED BY REQUIREMENTS OF THE
ACT 
9.1 Ensuring regulated procurements contribute to the carrying out of the
council's functions and the achievement of council purposes
9.1.1 All regulated procurements will be conducted using the procurement toolkit and
procedures set out at section 7 herein. For clarity, it is expected a pre-tender
contract strategy will be completed and a post-tender contract award report will be
produced; both documents require the council priority, ambition statement and
programme of work priority to be identified, and both require authorisation to be
finalised per GCSOs. 
9.1.2 With the checkpoints in place in the respective procurement toolkit documents, CPT
can log the impacts of each procurement into our procurement registers allowing us
to produce a compliance report to verify expected outcomes and compliance with
the Act. 
9.2 Ensuring regulated procurements deliver value for money
9.2.1 All regulated procurements will be conducted using the procurement toolkit and
procedures set out at section 7 herein. For clarity, it is expected a pre-tender
contract strategy will be completed and a post-tender contract award report will be
produced. 
9.2.2 The contract strategy will set out the options appraisal and tender evaluation criteria
chosen with the aim to deliver value of money; this document will require approval
before the tender pack is produced and the procurement is published. 
9.2.3 The contract award report will outline the evaluation results validating how the
tender of the preferred bidder represents value for money; this document will require
the relevant approval to enable the next stages in contract award process. 
9.2.4 With the checkpoints in place in the respective procurement toolkit documents and
procedures, CPT can log the impacts of each procurement into our procurement
registers allowing us to produce a compliance report to verify expected outcomes
and compliance with the Act. 
9.3 Ensuring regulated procurements are carried out in compliance with the
general duties to; treat economic operators equally and without
discrimination, act in a transparent and proportionate manner, and to comply
with the sustainable procurement duty
9.3.1 All regulated procurements will be conducted using the procurement toolkit and
procedures set out at section 7 herein. 
9.3.2 The contract strategy provides an appraisal on the procurement route, and will
consider maximising competition, reducing barriers to entry, and ensuring complying
with the principles of procurement. 
9.3.3 Considerations on sustainable procurement duty are initially carried out within the
category strategy making appraisals with use of the online sustainable procurement
tools. Those measures identified at category level transfer into the contract strategy
for full use or adaptation to suit the individual contract requirement.
Page 63 of 248

Page 64

9.3.4 The contract strategy will require approval before the tender pack is produced and
the procurement is published. 
9.3.5 The notifications of contract awards decisions will provide successful and
unsuccessful candidates and tenderers comprehensive feedback to the extent
provided by the relevant governance of the procurement. 
9.3.6 With the checkpoints in place in the procurement toolkit, CPT can log the impacts of
each procurement into our procurement registers allowing us to produce a
compliance report to verify expected outcomes and compliance with the Act. 
9.4 The council’s general policy on the use of community benefit requirements
9.4.1 The Act requires public bodies to give consideration whether to incorporate
Community Benefit requirements as part of the Procurement when the estimated
contract value is greater than or equal to £4 million; the council comply with this
requirement. In addition to this, the council give enhanced consideration for
Community Benefits for all Regulated Procurement for Supplies or Services, and for
all Works procurements greater than £500k; this is incorporated into the council’s
pre-tender procedures. 
9.4.2 The Council recognises procurement as a key mechanism for delivering wider
social, economic and environmental benefits for communities across North
Lanarkshire. The Council’s Community Wealth Building Statement, aligned with
national policy, identifies procurement under the “Spending” pillar as being an
enabler for improving employment, training, skills development and sub‑contracting
opportunities within the local economy. 
9.4.3 The Council is committed to leveraging its procurement spend to maximise these
wider community outcomes wherever appropriate and proportionate. 
9.4.4 The Council will:
• Include Community Benefit requirements in its contracts where there is a clear
opportunity to benefit the community, ensuring these requirements comply
with all relevant legislation, statutory guidance, best practice and the Council’s
GCSOs.
• Use procurement activity to promote Fair Work First, encourage inclusive
employment practices, support skills development, and stimulate local supply
chains in alignment with the Council’s Community Wealth Building priorities.
• Ensure that Community Benefit requirements contribute to local and national
outcomes, particularly in relation to employability, skills development and
regeneration. 
9.4.5 For each procurement exercise, the Contract Strategy will assess opportunities for
Community Benefits relevant to the market and proportionate to contract value and
duration. As part of this assessment, the Strategy will set clear, measurable targets,
which may include:
• Job creation and employment opportunities;
• Apprenticeships, training or skills development;
• Use of local or SME sub‑contractors;
• Activities aligned with Fair Work First;
• Community and/or environmental initiatives.
Page 64 of 248

Page 65

The identification and inclusion of these requirements at the pre‑tender stage
ensure that Community Benefits are fully integrated into the tender pack, the
evaluation of tender proposals, and the post‑award contract management. 
9.4.6 For all contracts awarded where Community Benefits form part of the supplier
proposal, CPT will log all expected benefits in the Procurement Register. CPT will
also report the Community Benefits achieved within the council’s Annual
Procurement Report. 
9.4.7 Under the Council’s Contract Management approach, the responsible Contract
Manager will manage and monitor the appointed Contractor to ensure that agreed
Community Benefits are delivered. 
9.4.8 The appointed Contractor must provide the council with regular updates on the
progress of their Community Benefit commitments. Where targets are not being
achieved, the contractor must provide details of remedial actions they propose to
undertake to deliver the required outcomes. 
9.4.9 The Council will continually review the effectiveness of Community Benefit
requirements through contract management, supplier reporting and annual
performance reporting. Lessons learned will inform future procurement practice and
help strengthen the role of procurement in supporting the Council’s Community
Wealth Building ambitions. 
9.5 The council’s general policy on consulting and engaging with those affected
by its procurements
9.5.1 The council recognises that it is important to consult and engage with those affected
by our procurements, and where relevant and proportionate, to allow the views of
those affected to be considered. The procurements must accurately reflect need
and opportunity, and take account of the wider context, including the local and
national priorities. 
9.5.2 In each individual procurement, the contract strategy development will therefore
prompt consideration of those affected. 
9.5.3 The council engage outward with stakeholders through many formats and channels,
tailored to the procurement and its objective.  Examples include but are not
restricted to online surveys; public and community consultations; and targeted
engagement with affected stakeholder groups for the specific procurement being
sought. 
9.5.4 The council encourages its procuring officers to undertake pre-tender engagement
with the marketplace, particularly when it has complex requirements and/or when
through analysis it anticipates that the level of competition is low which would then
impact on the competitiveness of the procurement. 
9.5.5 The council will consider a trauma informed approach where is it relevant to do so,
allowing those procurements to integrate the knowledge and experience gained
through lived experience of both adults and children. The process of including lived
experience involves working with people through the tender design, evaluation and
implementation, fully adapting processes, paperwork and systems to promote
diversity, inclusion, support and recognition of trauma and/or lived experience. 
Page 65 of 248

Page 66

9.5.6 Procurement and commissioning of health and social related services, where
considered possible to do so, are undertaken with involvement of people who use
the services. All regulated procurements for health & social care consider best
practice principles for ethical commissioning. 
9.5.7 The council complies with its duty to respond to requests received under freedom of
information and there is an online Comments, Compliments and Complaints
procedure. 
9.6 The council’s general policy on the payment of a living wage to persons
involved in producing, providing or constructing the subject matter of
regulated procurements
9.6.1 The council’s Fair Work First approach is published on the councils website,
detailing the approach with our own workforce and operations. 
9.6.2 The council are an accredited Living Wage employer; this is a clear commitment to
pay at least the real Living Wage for all staff we directly employ. 
9.6.3 The council has made a commitment to implement and promote Fair Work First in
all relevant procurements in line with national policy. The council encourages the
Contractors we work with and want to attract, to pay the real Living Wage as part of
a package of fair work practice. It’s our experience that those which have a diverse
workforce and whose staff are well rewarded, well-motivated, well led and who have
appropriate opportunities for training and skills development, are likely to deliver a
higher quality of service. A positive approach to fair work practices can have a
positive effect on the quality of the services, supplies and work delivered on our
contracts. 
9.6.4 Where conditions of the national guidance on payment of the real Living Wage can
be legally mandated, we will follow such approach including model tender evaluation
questions available from the online sustainable procurement tools. 
9.6.5 Should the council award a contract to a Contractor who is making commitment to
pay the real Living Wage, this will form part of the contract, and it will be monitored
through the Contract Management arrangements. 
9.6.6 The council will report the number of real Living Wage Contractors appointed in our
Annual Procurement Report. 
9.7 The council’s general policy on promoting compliance by contractors and
sub-contractors with the health and safety at work etc. Act 1974 (c.37) and any
provision made under that act
9.7.1 The Council is committed to ensuring that nothing purchased by us is at the
expense of the health and safety of those who are involved in delivering our
contracts whether directly or as part of the supply chain. 
9.7.2 It is important that those bidding for our contracts can demonstrate that they are
responsible Contractors who keep to their legal duties, including duties relating to
health and safety. 
9.7.3 It is a standard condition of our contracts that the contractor must keep to all laws
that apply, the requirements of regulatory organisations, and good industry practice.
Page 66 of 248

Page 67

This includes any relevant health and safety law. Health and safety criterion forms
part of the evaluation for all relevant contracts. 
9.7.4 Whenever a Contractor’s staff are on our premises, under the terms of our standard
contracts they must keep to our own health and safety requirements. 
9.7.5 The council will revise our standard contract management arrangements to make
sure that we include information about health and safety incidents relating to
delivering our contracts and any measures we take to put things right. 
9.8 The council’s general policy on the procurement of fairly and ethically traded
goods and services
9.8.1 The council takes a robust approach in its procurement processes and work with its
collaborative procurement partners and agencies to tackle criminal activity in line
with the national serious organised crime strategy, and use the SPD and tender
questions to prevent human trafficking and exploitation, modern slavery, corruption
and fraud. It is our objective to promote positive employment practices. 
9.8.2 The regulated procurement procedures we follow involve assessing a potential
Contractors suitability to be awarded the contract. This process includes checking
for exclusion grounds per the regulations and the Act, such as convictions, breaches
of duty, offences or acts of professional misconduct. 
9.8.3 The council’s standard terms and conditions of contract allow the council to end a
contract if the Contractor or sub-Contractor fails to keep to their legal duties in the
areas of environmental, social or employment law when carrying out that contract. 
9.8.4 The council were awarded “Fairtrade Zone Status” in recognition of the support and
awareness the local schools, churches, businesses, and communities have given to
Fairtrade products. This a clear commitment to consider the relevant and
proportionate application of fair and ethical principles in our procurement activities. 
9.8.5 The council commits to considering the purchase of fairly and ethically traded
supplies if available to meet our requirements through the contract strategy, which
includes seeing how best to integrate with the specification of requirements and
evaluation process. 
9.8.6 The APR for this strategy will include a statement about the effectiveness of our
procurement procedures. 
9.9 The council’s general policy on regulated procurements involving the
provision of food
9.9.1 The council recognises food and drink as a key industry sector where major
sustainability wins can be achieved. The procurement of food and catering services
is a high-ranking area because there are major social, economic, and environmental
impacts. It can have benefits on community health, wellbeing, and social justice
through access to good nutrition including fresh and seasonal produce. 
9.9.2 The council’s approach to its contracts involving food, which are under our direct
control, is to make sure that it keeps to all relevant Government policies on healthy
eating and nutrition, promoting fresh and seasonal and local produce, and on fairly
Page 67 of 248

Page 68

and ethically traded produce. These standards take account of a range of factors,
including production, traceability, authenticity, origin, ethical trading, animal welfare,
environmental standards, and health and waste. 
9.9.3 The council continue to consider available Scottish products that we source through
initiatives such as the Red Tractor assurance scheme and through engagement with
the Food for Life programme we aim to increase the amount of locally sourced and
produced food for our schools. 
9.9.4 Keeping to the policy commitment is part of our Contract Management
arrangements for all food contracts. 
9.10 The council’s approach to prompt payment performance in the supply chain
9.10.1 The council support the national policy and agree with the position that prompt
payment is necessary for local and national economic recovery and longer-term
wellbeing. Prompt payment of the supply chain is ethical and socially responsible,
and critical to the sustainability and resilience of our supply chains who in turn are
supporting us with our service delivery and priorities. 
9.10.2 Following SPPN 2/2022, the lead procuring officer will design the selection stage
(SPD) for a regulated procurements with a standard statement as means of
understanding the payment performance history and payments systems of bidders;
this allows an informed contract award decision and ability to reject a candidate that
does not comply with the requirement. 
9.10.3 The council’s standard terms and conditions, as mentioned at 7.4.1 herein, uses the
recommended clauses to mandate all aspects of prompt payment in our contracts.
We have also included an escalation process should any Contractor or Sub-
Contractor be in dispute that prompt payment has been complied with. 
9.10.4 Monitoring of compliance with prompt payment is covered within our guidance on
Contract Management and within GCSOs. 
Page 68 of 248

Page 69

10. HOW TO DO BUSINESS WITH NORTH LANARKSHIRE COUNCIL 
10.1 The council welcomes interest and competition in our contract opportunities from all
businesses. We have an ambitious plan for North Lanarkshire, and we recognise
the innovation and expertise that can be procured from the supply base can help us
to meet our objectives. 
10.2 Any potential Contractor who are seeking access to our contract opportunities are
encouraged to be registered on:
• the national advertising platform Public Contracts Scotland Portal (“PCS”);
and,
• the national e-Tendering system “PCS-Tender”.
these online platforms are used to facilitate our competitive quotations or
tenders and will provide automated notifications to Contractors (based on their
business areas they have matched their PCS profile to) when the council
advertise open opportunities. 
10.3 The council has a buyer portal which sits within PCS; this is a public resource that
acts as an online directory featuring links to:
• the council's contract register;
• displaying notices for our open contract opportunities; and 
• displaying notices of our previous contract awards. 
10.4 The council’s contract register holds current contract details; this helps any
Contractor determine opportunities, when current contracts expire and when the
council are likely to re-tender. 
10.5 The council produce an Annual Procurement Report which has a dedicated section
setting out the expected contract opportunities for suppliers to get involved in over
the next 2 financial years. 
10.6 Further links to the council’s procurement activity and publications can be found on
our website. 
10.7 For construction projects, in progress or coming soon, the council provide additional
updates on our activity through the “Scottish Pipeline Forecast Tool”. This acts as a
further resource that may be of assistance to potential suppliers looking for
subcontract opportunities. 
10.8 The corporate procurement team and procuring officers across the council’s Service
Areas support the Lanarkshire and National “Meet the Buyer” events, which are
generally the key networking days our procuring officers where we have time
dedicated to liaising with potential Contractors. 
10.9 In addition to liaison with the council, the Supplier Development Programme (“SDP”)
offer independent support and training to businesses who are seeking help /
guidance with public sector contracting opportunities. The council work in co-
operation with SDP including making referrals, especially where there is a change in
tender process. 
10.10 For awareness, the council’s contract opportunities for below £50,000
Supplies/Services or below £2,000,000 Works are not subject to the procurement
Page 69 of 248

Page 70

regulations, and in these cases the procuring Service Area is guided to consider a
procurement route that represents best value. 
10.11 Generally procuring officers undertaking non-regulated procurements will source
their requirements through either:
• Using an already established Framework Agreement i.e. Scotland Excel /
National Frameworks / Crown Commercial Services Frameworks; or
• Undertaking a competitive quotation exercise. 
10.12 The Council’s full procurement procedures are set out in our GCSOs. 
10.13 In addition to procurement‑specific support, the council promotes a broader
environment that enables sustainable business growth across North Lanarkshire,
aligned to the ambitions of the Plan for North Lanarkshire. 
10.14 The Invest: In North Lanarkshire programme provides further information for
prospective suppliers and investors, highlighting North Lanarkshire as a competitive
and well‑connected location, supported by strong transport links, a skilled workforce,
and access to innovation and digital infrastructure. The programme also offers
dedicated advisory services, including an in‑house planning pre‑advisory service to
streamline development processes, alongside support through Business Gateway
and regeneration partners. These services help reduce barriers to entering the local
market and strengthen the conditions for business growth. 
10.15 Collectively, this wider support reinforces North Lanarkshire’s commitment to
sustainable economic growth and provides clear, accessible routes for suppliers and
investors seeking to do business with the council. 
Page 70 of 248

Page 71

11. IMPLEMENTATION OF PROCUREMENT STRATEGY 2026/27 
11.1 This procurement strategy will subject to annual review to ensure that the council
are flexible in adopting emerging guidance and polices into its procurement function. 
11.2 There will be continued engagement with key stakeholders and access to
appropriate accredited training for relevant staff. 
11.3 Independent audit and assurance will be sought to challenge and assess on a
sample basis, both the procurement strategy content and intentions, and our
compliance with it; this will help to identify, and provide a process to correct, any
weakness. 
11.4 The council’s procurement performance against this procurement strategy will
continuously be monitored, with the associated reporting to be produced following
the end of the financial year (2026/27), with the output report expected to be
approved and published by 30 September 2027.
Page 71 of 248

Page 72

Page 72 of 248

Page 73

North Lanarkshire Council  
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    IM/JR Date 04/03/26 
Land Reallocation – Former St Mary’s School Site, Hill Street,
Caldercruix ML6 7PZ 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail MartinI@northlan.gov.uk Telephone Ian Martin
07966 397637 
Executive Summary 
The purpose of this report is to seek committee approval for the transfer of land held by
Education & Families for inclusion in the new build programme. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Approves the land transfer of a site at Hill Street, Caldercruix from Education and
Families to Planning and Regeneration on the terms detailed in Section 2.2 of this
report. 
(2) All other terms and conditions to be adjusted by the Chief Officer (Assets &
Procurement).  
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth
Programme of Work Transforming Places
Item 6
Page 73 of 248

Page 74

1. Background 
1.1 The former school site at Hill Street, Caldercruix was declared surplus at the Education
Committee on 13th October 2005. The former school was demolished, and the site has
remained vacant. 
1.2 The site was approved for inclusion in the New Supply programme at the Housing
Committee on 16th November 2022. The location plan is shown in Appendix 1 below. 
2. Report 
Description 
2.1 The site is cleared and comprises a mix of hardstanding and vegetation. Access is via
Hill Street. 
2.2 The proposal is to develop 25 NLC social housing units as part of the council’s overall
transformation strategy. The proposed development will consist of a mix of houses and
cottage flats. 
2.3 Planning permission for the site was approved on 27th November 2025, with
development programmed to start in March 2026 (Planning Reference 25/00881/FUL). 
Re-allocation 
2.4 The contractor has carried out site investigation works and submitted an assessment
of abnormal development costs. The costs relate to road improvements, service
connections, gas membranes and capping layers. The New Supply team have
reviewed the costs and have confirmed that they are reasonable given the extent of the
works required. The amount of abnormal development costs has been assessed at
£162,054. 
2.5 The headline value of the land is £650,000 and therefore to competently complete this
transfer, a capital sum of £487,946 is to be paid from the Housing Revenue Account to
the General Services Account. The transfer sum reflects the abnormal development
costs required in developing this site. 
3. Measures of success 
3.1 The residential development will regenerate a brownfield site and help the council meet
its new supply targets contributing to meeting local housing need, while creating new
residential units for social rent. 
4. Supporting documentation 
4.1 Appendix 1 Location Plan 
4.2 Appendix 2 Site Layout 
James McKinstry
Chief Officer (Assets and Procurement) 
Page 74 of 248

Page 75

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The transfer of land will enable the provision of high-quality housing for rent which
will help address housing need.   
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Provision has been made within the council’s HRA to fund the transfer of the land.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 75 of 248

Page 76

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The new homes will be more energy efficient contributing to the reduction in CO²
emissions.
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles
from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 76 of 248

Page 77

Appendix – 1 Location Plan 
Page 77 of 248

Page 78

Appendix – 2 Site Layout 
Page 78 of 248

Page 79

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT / PH Date 04/03/26 
Revenues and Benefits Update 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 07583 010692 
Executive Summary
This report provides an update on the performance within the Revenues and Benefits
functions of Finance & Technology as at 31 December 2025. 
Key points to note include: 
• As at 31 December 2025, 82.11% of Council Tax due for 2025/26 had been collected.
This is a marginal increase from the same period last financial year (0.37%). 
• Non-Domestic Rates collection at 31 December 2025 64.65% of the total annual charge
which is lower that the previous financial year (81%). 
• The Service continues to meet statutory timescales for administering benefits
applications and changes of circumstance. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the content of the report. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work Statutory / corporate / service requirement
Item 7
Page 79 of 248

Page 80

1. Background 
1.1 The Finance and Technology Service is responsible for the administration and
collection of all local taxation in North Lanarkshire in the form of Council Tax and Non
Domestic Rates. 
1.2 In addition, the Service administers a number of benefits for residents of North
Lanarkshire including Housing Benefit, Council Tax Reduction, Scottish Welfare Fund,
Discretionary Housing Payment, Free School Meals, Clothing Grants and Blue
Badges. 
2. Report  
Council Tax 
2.1 The graph below shows the cash collected at 31 December for each financial year. It
is worth noting that cash is allocated to specific Council Tax years so the graph
represents cash received against the initial billing year (i.e. billed and received in
2025/26) and does not include cash collected in subsequent years (i.e. billed in
2024/25 but received in 2025/26). This ensures a like for like comparison. 
2.2 The collection figure to 31 December in the 2025/26 financial year of 82.11% is 0.37%
higher than the same period last financial year. 
2.3 It should be noted that in-year collection of Council Tax is a Statutory Performance
Indicator. However, it does not reflect the overall collection rate of Council Tax which
includes collection of prior year arrears. This latter measure has a greater bearing on
the Council’s finances and is reflected in the regular budget monitoring reports to
Committee. 
70.00
75.00
80.00
85.00
2020/21 2021/22 2022/23 2023/24 2024/25 2025/26Percentage of annual billing collected
(%)
Financial Year
Council Tax Collection Rate at 31 December
Page 80 of 248

Page 81

Non-Domestic Rates 
2.4 The following graph shows the cash collected at 31 December for each financial year: 
2.5 The collection figure to 31 December in the 2025/26 financial year is 64.65%. This
represents an decrease of 16.35% compared to the same time period in 2024/25. 
2.6 The Finance and Resources Committee approved North Lanarkshire Council’s policy
on Empty Property Relief from 1 April 2023.  This policy has been subject to ongoing
review and at this stage, no amendments are proposed.  The policy will remain under
continuous monitoring, and any required revisions or proposals identified will be
presented to the Committee for consideration and approval. 
Housing Benefits 
2.7 The data below highlights the Statutory Performance Indicators measuring the speed
of processing for new Housing Benefit claims and for changes in circumstances. The
table below shows the cumulative figures for the 2025/26 financial year. 
Days to Process 2024/25 2025/26 DWP Processing
Target
New Claims  14 15 < 30 days
Change of Circumstances  11 11 < 16 days 
2.8 The Service continues to meet DWP targets aligned to the statutory requirements for
the speed of processing of both new claims and changes of circumstances. 
Council Tax Reduction Scheme 
2.9 As at 31 December 2025 a total of £29.033m in Council Tax Reduction has been
awarded for the 2025/26 financial year.  This compares to £26.237m to the same
period during 2024/25, representing an increase of £2.796m (10.66%). 
2.10 The Service received 4,539 applications between 1 April and 31 December 2025
compared with 5,057 during 2024/25, representing a decrease of 11.41%.
40
45
50
55
60
65
70
75
80
85
2020/21 2021/22 2022/23 2023/24 2024/25 2025/26Percentage of annual billing collected
(%)
Financial Year
Non Domestic Rates Collection Rate at 31 December
Page 81 of 248

Page 82

2.11 The Service continues to see an upward trend in the volume of changes in
circumstances requests. From 1 April to 31 December 2025 a total of 127,144 changes
were processed compared to 107,385 for the previous financial year; an increase of
18.40%. 
Discretionary Housing Payments (DHP) 
2.12  From 1 April 2017 funding for DHP has been devolved to Scottish Government. This
funding supports both the Scottish Government’s commitment to fully fund the
implications of the Bedroom Tax and an additional sum available for other reasons
such as the Benefit cap and the restrictions on Local Housing Allowance rates. 
2.13 From 1 January 2023 the Scottish Government is fully funding the implications of
mitigating the benefit cap. This was announced as part of the tackling child poverty
delivery plan ‘Best Start, Bright Futures’ in March 2022. Local authority Leaders have
agreed to fuller benefit cap mitigation through the DHP scheme from 1st January 2023.
For 2025/26 the Scottish Government has provided ring-fenced funding of £0.469m to
mitigate the benefit cap.  As at 31 December, the amount paid and committed in
respect of the benefit cap was £0.125m (26.57%). 
2.14 As at 31 December 2025 the total paid and committed in respect of Bedroom Tax was
£6.115m. In comparison, this sum was £5.956m at the same point during 2024/25. 
2.15 In addition, the Council received £0.467m in funding to address pressures unrelated to
the bedroom tax. In November 2025, the Scottish Government provided further
allocations of £0.043m and £0.056m under the Housing Emergency Action Plan to
support the improvement of homelessness services.  This resulted in a combined total
of £0.570m available for expenditure on activities not associated with the bedroom tax
or the benefit cap.  As at 31 December 2025, £0.433m, representing 75.94% of the
total funding, had been paid or formally committed. 
2.16 As in previous years, the Service will continue to liaise with colleagues in Housing and
Housing Associations to encourage applications to the fund. In addition, the Service
will also liaise with Universal Credit claimants affected by the benefit cap who could
possibly be eligible for the mitigation. 
Scottish Welfare Fund 
2.17 The Council has administered the Scottish Government’s Scottish Welfare Fund
(SWF) since 1 April 2016. 
2.18 The Scottish Government provides an annual award budget of £2.760m to North
Lanarkshire Council.   
2.19 As indicated in the last update to Committee, the Council has continued to assess
applications at High priority.  This means that applications will only be considered
where there is immediate and severe need, applicants are highly vulnerable, where
there will be significantly adverse impacts to health and wellbeing with a no grant
award, and where the effect of the grant is immediate and substantial. Staff assessing
Scottish Welfare Fund applications are highly trained in making these judgements in
accordance with the statutory guidance and where an application is unsuccessful, they
will signpost the applicant to other community-based supports. 
Page 82 of 248

Page 83

2.20 There are two grant schemes and their relative performance during 2025/26 and prior
year comparison is as follows: 
2025/26 
Applications
Assessed
Awards Unsuccessful
Applications
Acceptance
Rate
Crisis Grants 13,887 10,685 3,202 76.9%
Community Care
Grants (CCG)
3,123 2,078 1,045 66.5%
Total 17,010 12,763 4,247 75.0% 
2024/25 
Applications
Assessed
Awards Unsuccessful
Applications
Acceptance
Rate
Crisis Grants 14,667 10,463 4,204 71.3%
Community Care
Grants (CCG)
4,064 2,798 1,266 68.8%
Total 18,731 13,261 5,470 70.7% 
2.21 As at 31 December 2025, the total financial value of grants paid from the Scottish
Welfare Fund amounted to £2.158m.  This represents 64% of the total budget
(including the carry forward from 2024/25).  It is expected that the allocated budget will
be fully spent this financial year taking account of an anticipated increase in crisis
applications in the winter months, as well as the assessment of a number of CCG
applications that are awaiting assessment.   
2.22 During 2025/26, the Scottish Welfare Fund has seen a decrease in demand for Crisis
applications of 5.32% and a decrease in demand for Community Care Grant (CCG)
applications of 23.15%. Although this appears a significant reduction in CCG
applications, after taking account of the current outstanding CCG applications still to
be assessed, the decrease in demand is 15.77%. The decline in SWF application
volumes during 2025/26 appears to be influenced by a combination of policy,
awareness, accessibility, and broader socioeconomic factors. The continued
application of High priority criteria will likely maintain this trend. 
2.23 The Service strives to assess applications within the timescales outlined within Scottish
Government guidance. Throughout the period the Service has largely continued to
assess Crisis applications within the two working day time limit.  Whilst it has been
more challenging throughout the last year to meet the 15 working day time limit for
Community Care Grants, the Service is currently assessing such applications within
that timeframe and continues to Fastrack applications linked to homelessness
supporting the wider Rapid Rehousing and Homes First strategies. 
Clothing Grants and Free School Meals 
2.24 The Finance Service administers Clothing Grant payments and applications for Free
School Meals on behalf of the Council for families meeting low-income eligibility
criteria. 
2.25 Up to 31 December 2025 the Service administered and paid out 11,187 Clothing
Grants compared to 11,711 by the end of December 2024.   
2.26 The Service also awarded 10,211 Free School Meal applications in this period
compared to 10,167 for the same period in 2024.
Page 83 of 248

Page 84

Blue Badges 
2.27 The Finance Service administers the Blue Badge scheme in accordance with Scottish
Government guidance. The eligibility criteria means that some are automatically
entitled to a Blue Badge. In other cases, the Council assesses an individual’s eligibility
which may include the requirement for a mobility assessment and meeting a healthcare
professional. 
2.28 As at 31 December 2025, the Service administered 8,743 Blue Badge applications with
7,125 awarded (81.5% award rate). Over the same period in the 2024/25 financial year
the Service administered 8,690 applications with 7,793 awarded (89.7% award rate). 
2.29 Scottish Government guidance states that applicants should receive a decision on their
application in around 12 weeks. The Council is currently reaching a decision within 6
weeks. 
3. Measures of success 
3.1  Continuous improvement in processing and collection rates.   
4. Supporting documentation 
None 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 84 of 248

Page 85

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 85 of 248

Page 86

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
The Service has been liaising with Business and Digital on the Landlord Portal and
RPA developments and these will be managed in line with Business and Digital’s
available resources. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC).  
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 86 of 248

Page 87

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/KS/FC/DC Date 04/03/26 
Revenue Monitoring Report Council Summary
1 April 2025 to 02 January 2026 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 07583 010692 
Executive Summary
This report updates on the overall financial position for the General Fund Account, Housing
Revenue Account and Adult Health and Social Care, for the financial year to 31 March 2026. 
The report consolidates the budget monitoring position of all Services, highlighting and
explaining major variances as per the Council’s approved Financial Regulations. The report
also summarises the most recently reported position in relation to the three of the Council’s
Arm’s Length External Organisations, North Lanarkshire Properties, Fusion Assets and Routes
to Work. 
The Council approved its General Fund Revenue Budget on 20 February 2025.  Following
confirmation of funding from Scottish Government, at the time of reporting, the overall budget
is now £1,072.359m.   At this stage in the year, a surplus of £5.445m is currently projected. 
The 2025/26 budget incorporates £6.628m of net savings. It is projected that £5.894m of the
savings (89%) will be delivered within the financial year, with replacement savings of £0.734m
identified to fully address the shortfall. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the financial position of the 2025/26 revenue budget; and
(2) Otherwise endorse the contents of this report.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 8
Page 87 of 248

Page 88

1. Background 
1.1 The Council’s approved Financial Regulations require services to remain within their
approved budgetary provision, and to report all significant deviations - defined as the
higher of £100,000 or 5% - within their budget monitoring reports.  Where significant
deviations are identified, services must provide explanatory commentary, outline the
action required to rectify such deviations and where relevant, must also highlight the
impact this has on other budget headings. 
2. Report 
2.1 At its meeting of 20 February 2025, the Council approved a General Fund Revenue
Budget of £1,095.241m including expenditure budgets which will be offset by ring fenced
grant resources of £15.296m, resulting in a net expenditure position for monitoring
purposes of £1,079.945m.  Following confirmation of Scottish Government funding for
financial year 2025/26, after reflecting, for monitoring purposes, the reversal of use of
balances in respect of previously approved savings now applied, additional Scottish
Government funding notified during the year, and the transfer to capital as noted in
paragraph 2.11 below, the overall total budget is now £1,072.359m. 
2.2 Following the budget setting in February 2025 the Council has an approved savings target
of £6.628m for 2025/26.  Further detail can be found in Section 2.12 below. 
2.3 Table 1 below summarises the projected income and expenditure position, which
illustrates a projected surplus of £5.445m, which will be available to support future budget
challenges in accordance with the approved reserves policy, and any budget strategy
recommended by the S95 Officer. 
Annual 
Budget
(£m)
Projected
Outturn
(£m)
P10
Variance
(£m)
P6
Variance
(£m)
P6 to P10
Movement
(£m)
Expenditure     
Total Expenditure 1,072.359 1,066.914 5.445 3.500 1.945
Income     
Aggregate External Finance   879.301   879.301 - - -
Local Tax Collection   187.769   187.769 - - -
Use of Balance   5.289 5.289 - - -      
Total Income 1,072.359 1,072.359 - - -
Forecast surplus/ (deficit): to
support future budgets
- 5.445   5.445 3.500 1.945
Table 1 
Page 88 of 248

Page 89

Analysis of Significant Variations
2.4  Table 2 below illustrates the projected outturn financial position of services: 
Service P10 Outturn
(£m)
P6 Outturn
(£m)
P6 to P10
Movement
(£m)
Education and Families - On Budget - On Budget -
Enterprise and Communities - On Budget - On Budget -
Chief Executives and Other
Corporate Services 0.898 Underspend 0.500 Underspend 0.398
Social Work (Non-Integrated) - On Budget - On Budget -
Executive Services Total 0.898 Underspend 0.500 Underspend 0.398
Financing Costs 3.000 Underspend 3.000 Underspend -
Assumptions not yet Realised 1.547 Underspend - On Budget 1.547
Forecast surplus/ (deficit): to
support future budgets 5.445 Underspend 3.500 Underspend 1.945
Table 2 
2.5 Education and Families is reporting an overall breakeven position with a number of
compensating variances within this position. Underspends are projected in payments to
other bodies of £0.282m partly due to demand for family placements being lower than
resources available, and in supplies and services (£0.266m) and other expenditure
(£0.137m) due to various service variances primarily within Children & Families. These
underspends are offset by overspends in administration costs (£0.097m) primarily due to
higher than anticipated legal fees, and in transfer payments of £0.167m as result of care
plan payments, together with an under-recovery in income (£0.403m) due to a reduction
in Scottish Attainment Challenge grant and reduced income in relation to supported
employment. 
2.6 Enterprise and Communities is also reporting a projected breakeven position, with a
number of compensatory variances contributing to this overall position. Employee costs
are forecast to underspend by £3.688m as a result of vacancy savings partially offset by
increased overtime, and administration costs are projected to underspend by £0.102m
across a number of expenditure lines including external printing. In addition, there is an
over-recovery of income of £0.205m projected as a result of an increased level of building
control fees, garden waste permits, fleet recharges and leisure pay as you go income.
These favourable variances are offset by overspends in property costs of £1.482m due to
stair and close lighting costs being higher than historic levels, together with increased
costs of repairs and waste tonnage expenses, £1.038m in transport and plant due to
overspends on contract work and tyres, £0.806m in payments to other bodies primarily as
a result of increased agency costs within waste and fleet to cover key staff vacancies, 
£0.438m in supplies and services primarily due to increased ICT costs, and an overspend
of £0.191m in capital financing costs as a result of a funding contribution to capital support
project work at Summerlee. 
2.7 Chief Executives and Other Corporate Services is reporting a projected underspend of
£0.898m, an increase of £0.398m from the position reported at Period 6. The projected
underspend is primarily as a result of employee cost savings across the service totalling
£1.291m due to vacancies and an over-recovery in income of £0.166m relating to the NLP
financial guarantee, interest on repayments of VAT from HMRC, and rent allowance/
Page 89 of 248

Page 90

rebates overpayment recoveries. These favourable variances are partially offset by
overspends in supplies and services of £0.283m as result of ICT improvements in Civic
centre, libraries and schools, and digital upgrades within Corporate Communications, and
an overspend in administration costs of £0.288m relating to increased insurance
premiums and postage costs. 
2.8 In respect of loan charges and interest earned on revenue balances; due to significant
uncertainty and volatility within market conditions, and other variables, there is a risk of
movement in the level of net financing costs expected in the current financial year. 
Following further consideration and updating of a number of factors, including latest
projections on profiled capital expenditure, further refining of interest on revenue balances
modelling and interest rates observed, £3.000m of the overall forecast net over recovery
on budget is reported. Committee should note that some of the factors contributing to the
overall financing costs position are purely timing, therefore, it is prudent to ensure the
funding to manage these elements is earmarked in line with the overall longer term funding
strategy for loan charges and interest on revenue balances.  The final position in this
respect will be kept under review and reported as part of the year end process. 
2.9 Committee are also advised that the budget for both council tax income and council tax
reduction (CTR) are monitored on an ongoing basis. This includes consideration of council
tax collection, CTR uptake and household numbers. In addition, an assessment of
expected credit losses will be required.  At this point in the financial year the Council Tax
product is expected to be on budget and an update on this position will be reported further
into the financial year. 
2.10 As previously advised the 2025/26 pay awards for Single Status employees has been
settled with an uplift of 4% and a further 3.5% for 2026/27 has been agreed. Teachers pay
has also been agreed which will see an uplift of 4% for 2025/26 with an additional uplift to
4.25% in April 2026, and 3.25% in August 2026. The Council’s Medium Term Financial
Plan included provision for a 3% uplift for both Teachers and Non-Teachers pay awards,
and during the negotiations, Scottish Government committed to provide funding to support
the cost of the pay awards in excess of 3%. Notification of funding in relation to Single
Status employees has been received, and following discussion at COSLA Leaders group,
an estimate has been made in relation to the level of funding in relation to Teachers, with
an underspend of £1.245m now anticipated as a result of funding levels being higher than
actual costs incurred during 2025/26.  In addition, there is a further underspend of £0.302m
primarily due to additional Scottish Government funding for costs which are being partly
met by other budgetary provision, and other minor budget assumptions not realised. 
2.11 In line with recent years, Scottish Government’s overall funding for pay will be made
through capital funding for 2025/26. As previously advised, the Council has been asked
to absorb a proportion of this in lieu of revenue funding, now confirmed at £20.000m. This
has resulted in a reduction in the reported net budget illustrated in appendix 1, with a
corresponding increase in General Capital Grant. As in previous years, a Local
Government Finance Circular has been issued providing a temporary amendment to the
statutory accounting requirements for capital grant which allows the necessary flexibilities
in accounting such that the grant can be used to offset the revenue pressures linked to
pay award, thus ensuring this transfer does not have a negative impact on the Council's
overall revenue position. 
2025/26 Budget Savings 
2.12 As outlined in paragraph 2.2 above, the Council has approved net savings of £6.628m for
2025/26.  Each Service reports on the achievement of their savings within the relevant
service monitoring report.  It is projected that £5.894m of savings (89%) will be achieved
Page 90 of 248

Page 91

in the current year, with replacement savings of £0.734m identified to fully address the
shortfall. 
Earmarked Reserves and Change Management Fund 
2.13 The Council’s audited annual accounts highlight a General Fund reserve balance of
£281.970m.  This balance includes £8.000m for the Contingency Fund, with a further
£242.079m earmarked for specific future commitments including £12.563m allocated to
the Change Management Fund to support one off costs of approved savings and to ensure
the Council has a resilient and sustainable financial plan. The remaining £31.891m of
funds have been earmarked to support future budget challenges. 
2.14 A total of £34.788m of earmarked reserves is profiled for use in 2025/26 with a further
£207.291m profiled for use in future years. It is currently projected that £33.584m will be
spent during this financial year with £208.118m anticipated to be required in future years
and £0.377m no longer required. A summary position is shown in Appendix 2.  Taking into
account the projected forecast surplus of £5.445m and £0.377m of earmarked reserves
no longer required, it is expected that at the end of the financial year the General Fund will
include funds set aside for future budget pressures of £37.713m as detailed in Appendix
3.  These balances are to support future budget challenges in accordance with the
approved reserves policy, and any budget strategy recommended by the S95 Officer. 
Risks and Uncertainty 
2.15 All activities undertaken by the Council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy, Services manage these as part of their
overall corporate and service planning processes.  The current economic climate and pay
and non-pay inflation continuing at historically high levels, are some of the key factors that
have the potential to impact upon the Council’s ability to provide quality services within
approved budget levels. 
Housing Revenue Account 
2.16 The Housing Revenue Account is currently projecting a £0.101m underspend position for
the financial year. Within this position there are underspends within employee costs of
£0.290m due to current level of vacancies, administration costs of £0.500m mainly as a
result of decreased costs in relation to expected future credit loss, an underspend of
£0.534m within capital financing costs as result of reduced loan charges due to lower than
anticipated borrowing rates, together with an over-recovery of income of £1.296m is
primarily linked to an over-recovery of interest on revenue balances.  In order to maximise
the benefit of the over-recovery of income and underspends identified the Service has
received approval for an additional contribution of £2.477m to the capital programme to
support the HRA Capital Buy Back Scheme. It is anticipated that £1.050m of savings
(100%) will be delivered by year end. 
Adult Health and Social Care 
2.17 Council Adult Health and Social Care provision to the Integration Joint Board (IJB) is
projecting an overspend of £2.361m mainly as a result of overspends in payments to other
bodies and transfer payments of £4.267m primarily in relation to increased demand in
Care at Home and Independent Care homes. This is partially offset by underspends in
employee costs of £1.192m as a result of slippage in recruitment across the service,
reduced supplies and services costs of £0.511m in relation to spend in the equipment and
adaptations budget, and a reduction in transport and plant costs of £0.135m due to lower
staff mileage and vehicle contract hire costs. The overall position also includes an
Page 91 of 248

Page 92

underspend in property costs of £0.171m predominantly due to lower than anticipated
spend on adaptations via the HRA budget which is offset by an under-recovery in income
of £0.146m primarily due to reduced HRA contributions linked to this spend. The net
overspend for the year will be fully funded from IJB reserves. 
Arms Length External Organisations 
2.18 The Council holds an interest in a number of Arms Length External Organisations
(ALEOs). These organisations have their own governance arrangements, and report on
their financial performance to the appropriate Boards/ Management Committee in line with
their own reporting timetables. Summary information on the financial performance of North
Lanarkshire Properties, Fusion Assets and Routes to Work as at end of quarter 2 is
detailed in paragraphs 2.19 to 2.21 below. 
2.19 North Lanarkshire Properties LLP is projecting a profit of £1.016m before loan repayments
of £0.500m, resulting in an anticipated transfer into reserves of £0.516m, largely
attributable to receipt of bank interest, an over-recovery in rental income coupled with an
underspend within employee costs, partially offset by increased building management
costs. 
2.20 Fusion Assets Limited is currently projecting a profit within their operating budget of
£0.095m as at 31 March 2026.  This is due the over-recovery in income relating to bank
interest coupled with the delay in the recruitment of a Project Manager. Project expenditure
is reported from inception of Fusion Assets Limited and as at 30 September 2025, is
projecting a surplus of £3.033m, primarily in relation to increased projected investment
returns from Condor Park and Lanarkshire Enterprise Park, partially offset by increased
expenditure at Gartcosh Phase 2 and Newhouse A1 projects. 
2.21 Routes to Work Limited is currently projecting a profit of £0.072m as at 31 March
2026.  This is primarily due the timing associated with receipt of UK Shared Prosperity
Fund income. 
3. Measures of success 
3.1 The Council continues to operate within approved budgeted resources.   
4. Supporting documentation 
4.1 Appendix 1 Summary by Division
4.2 Appendix 2 Anticipated Commitments – Earmarked Reserves
4.3 Appendix 3 Availability of One-Off Funds – Change Management Fund 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 92 of 248

Page 93

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 93 of 248

Page 94

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐     
Page 94 of 248

Page 95

LINE SERVICE  ACCOUNT ANNUAL PROVISIONAL
NO. BUDGET OUTTURN
(1) (2) (3) (4)
£      £      £     
1 Education, Children & Families 529,078,423              529,078,423              -                            
2 Early Years 32,994,343                32,994,343                -                            
3 Primary Schools 149,854,879              149,854,879              -                            
4 Secondary Schools 144,167,220              144,167,220              -                            
5 Special Schools 29,686,958                29,686,958                -                            
6 Education Service Delivery 120,191,025              120,889,589              (698,564 )                
7 Children & Families 42,280,237                41,340,823                939,414                 
8 Justice Services 93,996                      93,996                      -                            
10 Employability 2,870,623                  2,859,896                 10,727                   
11 Community Learning 4,773,239                  4,970,744                 (197,505 )                
12 Tackling Poverty 2,165,903                  2,219,975                 (54,072 )                  
13 Enterprise & Communities 212,109,061              212,109,061              -                            
14 Assets & Procurement 20,979,273                20,965,170                14,103                   
15 Trading Accounts (462,182 )                   (51,471 )                     (410,711 )                
16 Community Operations 176,251,767              176,469,702              (217,935 )                
17 Housing Management 6,148,018                  5,856,765                 291,253                 
18 Place 9,192,185                  8,868,895                 323,290                 
19 Chief Executives & Other Corporate Services 109,553,389              108,655,970              897,419                 
20 Directorate & Support 1,287,897                  1,231,441                 56,456                   
21 Finance & Technology 72,003,091                71,594,534                408,557                 
22 Audit & Risk 495,586                    444,254                    51,332                   
23 Legal & Democratic 3,099,478                  2,952,576                 146,902                 
24 People Resources 9,754,789                  9,688,462                 66,327                   
25 Strategy & Communications 7,287,985                  7,388,444                 (100,459 )                
26 Other Corporate Services 7,946,920                  7,678,617                 268,303                 
27 Joint Boards 7,677,643                  7,677,643                 -                            
28 Social Work (non Integrated) 220,834,072              220,834,072              -                            
29 GENERAL FUND SERVICES 1,071,574,945           1,070,677,526           897,419                 
30 FINANCING COSTS (29,305,800 )               (32,305,800 )              3,000,000              
31 Reversal of Capital Charge (87,955,196 )               (87,955,196 )              -                            
32 Loan Charges and Interest on Revenue Balances 58,649,396                55,649,396                3,000,000              
33 OTHER BUDGETARY ISSUES 30,090,320                28,542,715                1,547,605              
34 Assumptions not yet Realised 30,090,320                28,542,715                1,547,605              
37 Transfer from capital grant (Pay Award) -                               -                            
38 TOTAL EXPENDITURE 1,072,359,465           1,066,914,442           5,445,023              
39 SOURCES OF FUNDING 1,072,359,465           1,072,359,465           -                            
40 Aggregate External Finance 879,301,000              879,301,000              -                            
41 Council Tax 187,769,465              187,769,465              -                            
42 Use of balances 5,289,000                  5,289,000                 -                            
43 FORECAST (SURPLUS)/DEFICIT: TO SUPPORT FUTURE
BUDGETS
-                               (5,445,023 )                5,445,023              
44 HOUSING REVENUE ACCOUNT (SURPLUS) / DEFICIT -                               (101,000 )                   101,000                 
45 ADULT HEALTH AND SOCIAL CARE (SURPLUS) /DEFICIT -                               2,361,351                 (2,361,351 )             
Appendix  1
NORTH  LANARKSHIRE COUNCIL
SUMMARY BY DIVISION FOR PERIOD ENDING 02 January 2026 (PERIOD 10)
PROVISIONAL
VARIANCES
Page 95 of 248

Page 96

Appendix 2
Total 2025/26 Future Years Total
Opening
Reserve
Balances 
In-Year
Adjustment 
Revised
Reserve
Balance 
2025/26
Revised
Earmarked
Reserve 
25/26
Projected
Spend 
Anticipated
Year End
Balance 
Anticipated
Future Year
Use 
No Longer
Required 
Profiled for
Future Years 
Anticipated
Future Year Use 
No Longer
Required 
No Longer
Required
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 Check Future Years
Change Management Fund 12,563         -                   12,563         2,421           2,421          -                     -                    -               10,142              10,142              -               -                  
Other Earmarked & One Off Resources
Schools Future Contractual Obligations 66,330         -                   66,330         -                  -                 -                     -                    -               66,330              66,330              -               -                  
Strategic Capital Investment Programme 44,800         -                   44,800         -                  -                 -                     -                    -               44,800              44,800              -               -                  
Loans Charges 26,614         -                   26,614         -                  -                 -                     -                    -               26,614              26,614              -               -                  
Strategic Workforce Planning 17,709         (133)               17,576         547              547             -                     -                    -               17,029              17,029              -               -                  
Temporary Accommodation 8,038          -                   8,038           -                  -                 -                     -                    -               8,038                8,038                -               -                  
Refugee Resettlement Programmes 6,887          -                   6,887           1,820           1,820          -                     -                    -               5,067                5,067                -               -                  
Whole Family Wellbeing 5,313          -                   5,313           600              600             -                     -                    -               4,713                4,713                -               -                  
Budget One-off Investment 5,289          -                   5,289           5,289           5,289          -                     -                    -               -                       -                       -               -                  
One Workforce Grading Pressures 5,000          -                   5,000           -                  -                 -                     -                    -               5,000                5,000                -               -                  
Unmanaged burdens within Education, Children & Families 4,507          (45)                4,462           693              693             -                     -                    -               3,769                3,769                -               -                  
School ICT Upgrades linked with Windows 11 2,675          -                   2,675           820              820             -                     -                    -               1,855                1,855                -               -                  
Balances held by Schools under Devolved School Management 2,395          -                   2,395           2,393           2,393          -                     -                    -               2                       2                       -                                  -
Pupil Equity Fund 1,941          -                   1,941           1,943           1,943          -                     -                    -               (2)                       (2)                       -               -                  
Early Years & Childcare Expansion 1,881          -                   1,881           1,666           1,666          -                     -                    -               215                   215                   -               -                  
Winter Reserve 1,500          -                   1,500           1,500           1,500          -                     -                    -               -                       -                       -               -                  
Support of Restructure Realignment of Home to School
Transport
1,500          45                1,545           1,545           1,545          -                     -                    -               -                       -                       -               -                  
Economic Recovery 1,400          -                   1,400           317              317             -                     -                    -               1,083                1,083                -               -                  
Owner Occupier Grants 1,233          -                   1,233           -                  -                 -                     -                    -               1,233                1,233                -               -                  
Cumbernauld Town Centre Regeneration 1,042          -                   1,042           -                  -                 -                     -                    -               1,042                1,042                -               -                  
Unmanaged burdens within Enterprise & Communities 1,000          -                   1,000           1,000           485             515                 515                -               -                       -                       -               -                  
Property Repairs 1,000          -                   1,000           1,000           1,000          -                     -                    -               -                       -                       -               -                  
Other Earmarked Funds 21,462         133               21,595         11,234         10,545        689                 312                377          10,361              10,361              -               377              
Other Earmarked & One Off Resources Total 229,516       -                   229,516        32,367         31,163        1,204              827                377          197,149            197,149            -               377              
Total Reserves 242,079       -               242,079        34,788         33,584        1,204              827                377          207,291            207,291            -           377              
Contingency Reserve 8,000         
Earmarked Reserve to support future budget challenges 31,891        
General Fund Surplus at 31 March 2025 281,970      
COMMITMENTS AGAINST RESERVES AS AT 02 January 2026 (PERIOD 10)
NORTH LANARKSHIRE COUNCIL
Page 96 of 248

Page 97

Appendix 3
£000 £000
Total Balance B/f per 2024/25 Annual Accounts 12,563 31,891
Period 10 reported variance 5,445
Earmarked Reserves no longer required 377
Total Balance 2025/26 before commitments 12,563 37,713
Revised one - off costs of approved savings (2,421)
Total Balance 2025/26;  to support future budget challenges 10,142 37,713
Known Commitments :- Revised one - off costs of approved savings (1,147)
Forecast Balance;  to support future budget challenges 8,995 37,713
NORTH  LANARKSHIRE COUNCIL
AVAILABILE GENERAL FUND BALANCES AS AT 02 January 2026 (PERIOD 10)
EMR; Change
Management Fund
EMR; Future Budget
Pressures
Page 97 of 248

Page 98

Page 98 of 248

Page 99

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/PH/PF Date 04/03/26 
Revenue Budget Monitoring Report; Chief Executive’s Service
01.04.25 – 02.01.26 (Period 10) 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 01698 302408 
Executive Summary
This report provides a summary of the Chief Executive’s Service financial performance for
the Period 1 April 2025 to 2 January 2026 (Period 10).   The report illustrates the provisional
outturn as at 31 March 2026, with major outturn variances highlighted and explained per
the Council’s approved Financial Regulations. 
The Council approved its General Fund Revenue Budget on 20 February 2025, of which
£109.553m currently represents the net revenue budget for the Chief Executive’s Service.   
Incorporated within the revenue budget are approved service savings totalling £0.793m.   
The Service is currently projecting a year-end underspend of £0.897m for the financial year
predominately as a result of employee vacancies, reduced training costs and over-
recoveries of income relating to VAT interest and the NLP Financial Guarantee offset by
approved additional spend in relation to ICT improvements within the Civic Centre and
Corporate Communications. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the financial position of the 2025/26 Chief Executive’s Service revenue
budget.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 9
Page 99 of 248

Page 100

1. Background 
1.1 The Council’s approved Financial Regulations require the Chief Executive to remain
within the approved budgetary provision, and to report all significant deviations -
defined as the higher of £100,000 or 5% - within budget monitoring reports. Where
significant deviations are identified, the Chief Executive must provide explanatory
commentary, outline the action required to rectify such deviations and where relevant,
must also highlight the impact this has on other budget headings. 
2. Report 
Summary of Financial Position 
2.1 The Council approved its General Fund Revenue Budget on 20 February 2025, of
which £113.897m (10.93%) represented the approved Revenue Budget for the Chief
Executive’s Service. In-year transfers to/from Enterprise and Communities and
Corporate Strategy coupled with the removal of budgets relating to the Improvement
Service due to a change in accounting treatment results in a revised budget of
£109.553m. 
2.2 The overall projected outturn position of the Service is a year-end underspend of
£0.897m.  Appendices one to five provide further information in respect of this position. 
2.3 As at Period 10 the position on Council Tax Reduction Scheme remains under review
along with other elements of the Council Tax Product including household numbers and
Council Tax collection for the year.  The Council Tax Product will then be assessed for
expected credit losses as part of the year end process. It is currently anticipated there
will be no material variance overall.   
2.4 The 2025/26 budget incorporates £0.793m of service savings which have been fully
delivered at Period 10.  Further information regarding savings is included in Appendix
5. 
Analysis of Significant Variances 
2.5 The service currently anticipates a projected underspend of £1.291m within Employee
costs as a result of actual and projected vacancies.   
2.6 The service is projecting a year-end overspend of £0.283m within Supplies and
Services due to approved additional spend for ICT improvements within the Civic
Centre and digital upgrades within Corporate Communications. 
2.7 The service is currently anticipating an overspend of £0.289m within Administration
Costs predominately due to increased insurance premiums and postages offset by
underspends within training and other administration costs. 
2.8 The service is currently projecting an underspend of £0.022m within Payments to Other
bodies due to the prioritisation of UKSPF, lower than anticipated costs within Agency
Fees and Local Tax Paypoint Commission costs partially offset by increased costs for
medical fees. 
2.9  The projected outturn for income is an over-recovery of £0.166m predominately
attributable to VAT interest, the impact of the NLP Financial Guarantee and Rent
Allowances / Rent Rebates Overpayments. 
Page 100 of 248

Page 101

2.10 There are various minor variances across other budget areas resulting in the Service
forecasting an underspend of £0.897m as at 31 March 2026. 
Earmarked and One-off Reserves 
2.11 In finalising the Council’s draft accounts to 31 March 2025, the service was given
approval to earmark £3.045m of resources to fund key projects and initiatives profiled
over a number of years.  It is anticipated that £1.780m of the reserves balances will be
utilised in 2025/26, a balance of £0.124m to be returned to reserves and the remaining
balance required for future years.  Details of the Service’s earmarked funds are
provided in Appendix 4.   
2.12 The Service has incurred £0.290m of severance costs relating to previous approved
savings/restructures.  Therefore, there is a requirement to utilise the Corporate Change
Management fund at this time.  Any further costs arising will be reported in future
reports as they are incurred.  These costs are not included in the Service outturn
position. 
2025/26 Budget Savings 
2.13 The Council approved service savings of £0.793m savings have been fully delivered
as at Period 10. Further information regarding savings is included in Appendix 5. 
Management Actions 
2.14 The Service is being pro-active to ensure expenditure is contained within its approved
2025/26 budget. 
3. Measures of success 
3.1  The Service continues to operate within approved budget resources.   
4. Supporting documentation 
4.1 Appendix 1 Objective Summary
4.2 Appendix 2 Subjective Summary
4.3 Appendix 3 Payments to Other Bodies
4.4 Appendix 4 Earmarked Reserves
4.5 Appendix 5 Budget Savings 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 101 of 248

Page 102

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
As stated in the main body of the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 102 of 248

Page 103

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All activities undertaken by the Council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy, Services manage these as part of
their overall corporate and service planning processes. The current economic
climate, in particular, has the potential to impact upon the Council’s ability to provide
quality services within approved budget levels. 
To minimise risk, this report has been prepared by service based Finance
personnel in consultation with budget managers, in accordance with the Financial
Regulations. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 103 of 248

Page 104

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 104 of 248

Page 105

APPENDIX 1
[1] [2] [3] [5] [6] [7]
DIRECTORATE & SUPPORT 1,287,897 1,231,441 56,456 FAV 4.4% 55,084 Vacant Chief Officer offset by higher duties within Strategy &
Engagement.
FINANCE & TECHNOLOGY 72,003,091 71,594,534 408,557 FAV 0.6% 200,976
Underspend in employee costs as a result of vacancies, over-
recovery of income within government grants, offset by overspends
in relation to Insurance premiums and postages and ICT
Improvements.
AUDIT & RISK 495,586 444,254 51,332 FAV 10.4% 31,340 Underspend within employee costs as a result of vacancies.
LEGAL & DEMOCRATIC 3,099,478 2,952,576 146,902 FAV 4.7% 59,123
Underspend within employee costs as a result of vacancies offset by
overspends within medical fees and an under-recovery in licensing
income.
PEOPLE RESOURCES 9,754,789 9,688,462 66,327 FAV 0.7% 24,155 Underspend within employee costs as a result of vacancies plus
projected underspends in training offset by medical fees.
STRATEGY & COMMUNICATIONS 7,287,985 7,388,444 (100,459) ADV (1.4%) (100,459)
Approved overspends relating to S&E Improvements, overtime within
Customer Service Hub and higher duties for vacant CO post coupled
with non achievement of turnover to static workforce.
OTHER COPORATE SERVICES 7,946,920 7,678,617 268,303 FAV 3.4% 127,654
Over-recovery of income relating to VAT Repayment interest and the
NLP Financial Guarantee plus underspends relating to historic
pension charges.
JOINT BOARDS 7,677,643 7,677,643 0 0.0% 0 On target
NET EXPENDITURE 109,553,389 108,655,970 897,418 FAV 0.8% 397,873
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Objective Analysis
Period 10 (01 April 2025 - 02 January 2026)
A - Chief Executives Service
DIVISION OF SERVICE ANNUAL BUDGET PROJECTED
OUTTURN
PROJECTED OUTTURN
VARIANCE %
[4]
PERIOD
MOVEMENT ANALYSIS
Page 105 of 248

Page 106

APPENDIX 2
[1] [2] [3] [5] [6] [7]
EMPLOYEE COSTS 46,038,094 44,746,617 1,291,477 FAV 2.8% 1,096,828 Underspends due to vacancies.
PROPERTY COSTS 2,052,397 2,095,198 (42,800) ADV (2.1%) (31,492) Building repair costs and approved spend for ICT improvements within
Civic Centre, Libraries and schools.
SUPPLIES & SERVICES 10,647,562 10,930,137 (282,575) ADV (2.7%) (323,028) Approved spend for ICT improvements within Civic Centre, Libraries
and schools.
TRANSPORT & PLANT 1,533,105 1,509,100 24,004 FAV 1.6% 18,189 Minor.
ADMINISTRATION COSTS 7,966,051 8,254,987 (288,936) ADV (3.6%) (348,834) Overspends relaing to increased insurance premiums and postages
offset by underspends within training and other admin costs.
PAYMENTS TO OTHER BODIES 12,892,830 12,870,770 22,060 FAV 0.2% 5,758 Underspend due to prioritisation of UKSPF funding, reduced spend
within Agency Fees and local tax paypoint charges.
TRANSFER PAYMENTS 103,209,963 103,209,963 0 0.0% 0 On target.
CAPITAL FINANCING COSTS 6,873,574 6,873,574 0 0.0% 0 On target.
REVENUE FINANCING COSTS 0 0 0 0.0% 0 On target.
OTHER EXPENDITURE 2,797,690 2,789,230 8,460 FAV 0.3% 5,000 Minor.
TOTAL EXPENDITURE 194,011,266 193,279,575 731,690 FAV 0.4% 422,421
INCOME (84,457,877) (84,623,605) 165,728 FAV (0.2%) (24,548)
Over-recovery of income relating to VAT Repayment interest, the NLP
Financial Guarantee coupled with Rent Allowances and Rent Rebates
overpayments.
NET EXPENDITURE 109,553,389 108,655,970 897,418 FAV 0.8% 397,873
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Subjective Analysis
Period 10 (01 April 2025 - 02 January 2026)
A - Chief Executives Service
CATEGORY ANNUAL BUDGET PROJECTED
OUTTURN
PROJECTED OUTTURN
VARIANCE %
[4]
ANALYSISPERIOD
MOVEMENT
Page 106 of 248

Page 107

APPENDIX 3
[1] [2] [3] [5] [6] [7]
PAYMENTS TO OTHER BODIES GENERAL 415,214 426,584 (11,370) ADV (2.7%) (11,370) Costs associated with work visas.
MEDICAL FEES 11,037 39,297 (28,260) ADV (256.1%) (22,873) Increased costs in relation to medical fees.
AGENCY FEES 167,686 157,996 9,690 FAV 5.8% 25,000 Underspends within Agency Fees
TOWN TWINNING 0 0 0 0.0% 0
CHILDRENS PANEL 25,035 25,035 0 0.0% 0
COSLA ANNUAL LEVY 207,942 207,942 0 0.0% 0
COMMUNITY COUNCIL GRANTS 125,222 120,222 5,000 FAV 4.0% 5,000 Minor
GRANTS TO ORGANISATIONS 773,242 773,242 0 0.0% 0
EXTERNAL AUDIT FEE 644,389 644,389 0 0.0% 0
ELECTION PROVISION 0 0 0 0.0% 0
TOURISM - VISIT NORTH LANARKSHIRE 77,000 40,000 37,000 FAV 48.1% 0 Prioritisation of UKSPF funding
SCOTTISH WELFARE FUND 3,375,940 3,375,940 0 0.0% 0
SUB-CONTRACTOR PAYMENTS 1,869 1,869 0 0.0% 0
LOCAL TAX PAYPOINT COMMISSION 35,000 25,000 10,000 FAV 28.6% 10,000 Underspend within local tax paypoint charges offset by
Agency staff costs within L&D.
LANDS VALUATION CONTRIBUTION 1,541,000 1,541,000 0 0.0% 0
SPT CONTRIBUTION 5,554,325 5,554,325 0 0.0% 0
SPT CONCESSIONARY FARES CONTRIBUTION 582,318 582,318 0 0.0% 0
TOTAL EXPENDITURE 13,537,219 13,515,159 22,060 FAV 0.2% 5,757
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Payments to Other Bodies
Period 10 (01 April 2025 - 02 January 2026)
A - Chief Executives Service
CATEGORY ANNUAL BUDGET
[4]
PROJECTED OUT-TURN
VARIANCE
PROJECTED OUT-
TURN % PERIOD
MOVEMENT ANALYSIS
Page 107 of 248

Page 108

APPENDIX 4
Value %
Service Specific Earmarked Reserves:
Workforce Strategy
Modern Apprentices AB1 53,813 53,813 20,882 20,882 38.8% 0 32,931 20,882
No longer required due postholders successfully
gaining employment prior to the end of their
placement.
Redundancy costs for staff (includes additional) AB3 250,000 0 250,000 0 174,011 69.6% 0 75,989 174,011 Proposal taken to Oct WSCG with a release date of
06/04/26.  Balance no longer required.
Brighter Futures AF 342,335 (57,498) 284,837 158,435 280,700 98.6% 4,137 0 280,700 Balance required in future years to support Employee
Costs
Training AC1 12,000 12,000 3,000 4,000 33.3% 8,000 0 4,000 Balance required in future years to support 3 year
CIAP Training
Scottish Welfare Fund
SWF Grant (Core and Admin) AB2 616,096 616,096 616,096 616,096 100.0% 0 0 616,096
Digital Improvements
Civica Procurement Implementation AB2 500,000 (500,000) 0 0 0 0.0% 0 0 0
Investment model replacement of funds AB3 / AG 380,033 380,033 117,362 380,032 100.0% 0 0 380,032
Backfill for EUC Infrastructure Team (Windows 11) AB3 26,552 26,552 26,552 26,552 100.0% 0 0 26,552
Equipment AD 15,000 15,000 0 0 0.0% 0 15,000 0 Reserve no longer required.
Customer Service Hub - Single Number AG 470,968 (464,426) 6,542 6,542 6,542 100.0% 0 0 6,542
Community Grants
SC&E - Grant Award Programme AG 265,787 (54,000) 211,787 131,787 211,787 100.0% 0 0 211,787
SC&E - Cumbernauld Community Grant AG 112,345 (53,322) 59,023 59,023 59,023 100.0% 0 0 59,023
TOTAL 3,044,928 (1,129,246) 1,915,683 1,139,679 1,779,625 92.9% 12,137 123,920 1,779,625
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Status of Earmarked Reserves
Period 10 (01 April 2025 - 02 January 2026)
A - Chief Executives Service
DESCRIPTION OF EARMARKED RESOURCE DIVISIO
N
Reserve
Allocation
Profiled in
Future Years
Approved
Reserve Total
Spend to
Date
Projected Spend Reprofile to
Future Years
No Longer
Required
FINANCIAL YEAR - 2025/26
Reserves
Required In
Year
Commentary Regards Usage
Page 108 of 248

Page 109

APPENDIX 5
£000 £000 £000
27CEX - a Chief Officer Review 140 140 0
04CEX Finance (5%) 71 71 0
Trend in recovery of rent allowances / rent
rebates 200 200 0
12CEX Business & Digital - Technology Solutions -
restructure and review of contracts 290 290 0
13CEX Business & Digital - Business Strategy 35 35 0
08CEX Registrars 57 57 0
TOTAL 793 793 0
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Savings
Period 10 (01 April 2025 - 02 January 2026)
A - Chief Executives Service
APPROVED SAVINGS
Ref. DESCRIPTION OF APPROVED SAVING Target Value Value
Deliverable Savings Gap Reasons for Savings Gap
Page 109 of 248

Page 110

Page 110 of 248

Page 111

North Lanarkshire Council Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/VR/RM Date 04/03/26 
Capital Programme 2025/26 Monitoring Report 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 
Executive Summary
The purpose of the report is to provide an update on the 2025/26 resources and
expenditure for the Council's Strategic Capital Investment Programme. The report shows
the 2025/26 projected outturn position and the resultant variances. 
It is currently anticipated that the General Fund programme will have a projected
programme expenditure variance of £6.835m, including £5.561m for Enterprise &
Communities within the roads and street lighting asset management (£1.843m), ASN
(£1.320m), Infrastructure and Transportation (£1.184m) and Town and Community Hubs
(£0.896m) themes mainly due to timing issues plus £0.803m for Chief Executives where
timing issues for IT projects have affected delivery.   
The HRA programme is currently projecting an expenditure variance of £2.871m due to
increased costs within the Buy-Back programme as a result of accelerated spend and
higher-value properties being purchased.  
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledges the projected outturn financial position of the Council’s Strategic
Capital Investment Programme as at 2 January 2026. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 10
Page 111 of 248

Page 112

1. Background 
1.1 The Strategic Capital Investment Programme 2024/25 to 2028/29 was approved at
Policy and Strategy Committee in March 2025 and represents the total Community
Investment Programme incorporating the General Services Capital Programme and
HRA Capital Programmes.  The programme was developed in conjunction with
Services and led by the Strategic Capital Delivery Group (SCDG) using the principles
established by the Council’s Capital Strategy. 
1.2 The General Services Capital Programme supported by General Services resources
demonstrates to communities that the place making visions for towns remains a priority
and that the approved 5-year capital investment plan supports delivery of The Plan for
North Lanarkshire. The programme includes additional investment in Town and
Community Hubs, the City Deal programme, and external grant funding. 
1.3 In addition, the Housing Revenue Account (HRA) resources support several HRA
Capital Investment Programmes including the Mainstream programme for investment
in the Council’s existing estate and delivery of the ambition for 5,000 additional supply
through the New Build and Council Buy Back programmes. 
1.4 The 2025/2026 General Services Capital Programme is currently £181.871m with a
£137.646m investment programme in relation to the Housing Revenue Account. This
reflects the approved budget in March 2025 at Policy and Strategy Committee, and
subsequent decisions made at the Strategic Capital Delivery Group (SCDG) in
accordance with the SCDG terms of reference, and where appropriate either by the
individual service committees, Finance and Resources Committee or the Policy and
Strategy Committee per the Scheme of Administration. Appendix 1 provides a
breakdown of the overall 2025/26 budget by Service Programme and associated
approved budget movements. 
2. Report 
Overall Council Strategic Capital Investment Programme 
2.1 The overall Council Strategic Capital Investment programme for 2025/26 and the
provisional outturn to 31 March 2026 is summarised in Table 1 as follows: 
Page 112 of 248

Page 113

2.2  On a budgeted programme of £319.517m, as at period 10, expenditure is anticipated 
to be £3.973m lower than budget. Further financial performance information regarding 
each of the programmes is discussed below. 
General Services Capital Programme and Projected Outturn by Service / Programme 
2.3 The forecast financial performance of the overall General Services Investment
programme at 31 March 2026 is detailed in Appendix 2 and summarised below.  
Community Capital Investment  Programme Summary 2025/26
Current
Programme
£000s
Provisional
Outturn 
£000s
Outturn
Variance 
£000s
Enterprise & Communities 172,590 167,029 5,561
Chief Executives 6,917 6,114 803
Adult Health & Social Care 2,364 1,884 480
General Services: Total Capital Investment 181,871 175,027 6,844
General Services Resources:
General Fund
External Grants & Contributions 2025/26 - GCG 47,637 47,637 0
External Grants & Contributions 2025/26 - Other Grants 13,638 13,638 0
External Grants & Contributions b/f 2024/25 - Other Grants 7,924 7,924 0
External Grants & Contributions Unapplied cfwd to 2026/27 (2,673) (2,673) 0
Net External Grants & Contributions 66,526 66,526 0
City Deal Grant 3,792 3,792 0
Capital Receipts 3,375 2,191 (1,184)
CFCR 7,501 7,501 0
General Services: Total Resources 81,194 80,010 (1,184)
General Services : Borrowing Requirement 100,677 95,017 (5,660)
HRA : Total Capital Investment 137,646 140,517 (2,871)
HRA Resources:
Net External Grants & Contributions 23,754 32,653 8,899
Capital Receipts 0 5 5
CFCR 23,155 25,632 2,477
HRA : Total Resources 46,909 58,290 11,381
HRA : Borrowing Requirement 90,737 82,227 (8,510)
Summary
Total Council : Capital Investment 319,517 315,544 3,973
Total Council : Resources 128,103 138,300 10,197
Total Council : Borrowing Requirement 191,414 177,244 (14,170)
Page 113 of 248

Page 114

General Services Total Resources 
2.4 The revised programme approved by the SCDG is £181.871m with total resources 
available to meet the current programme forecast to be £81.194m, resulting in a 
borrowing requirement of £100.677m. 
2.5 In 2025/26 net external grants and contributions of £70.318m will be utilised. This
capital resource primarily includes the Scottish Government (SG) General Capital
Grants receivable of £51.023m including General Capital Grant (GCG) of £47.637m
and additional specific grant allocations for Active Travel of £1.490m and Vacant and
Derelict Land Fund (VDLF) of £1.896m. In addition, other specific SG grants receivable
of £4.588m and contributions from other sources such as City Deal Grant of £3.792m,
Shared Prosperity Fund (SPF) of £1.014m, developer contributions of £2.811m, and
other grants of £1.840m. 
2.6 Capital grants received in 2024/25 have been added to the programme to match 
expenditure in 2025/26 of £7.924m including £2.224m for VDLF, £0.949m for PBIP, 
£1.142m for Regeneration Capital Grant Fund (RCGF), £3.212m for Live Labs, 
£0.060m for Levelling Up Fund (LUF), £0.164m for Active Travel, £0.044m for Parking 
Prohibition, £0.038m for Community Bus Fund , £0.055m for Environmental Key Fund 
and £0.026m for Scottish Wildlife Trust. This has been offset by £2.673m of external 
grant; £1.487m for VDLF, £1.142m for RCGF and £0.044m Parking Prohibition, which 
will not be applied in 2025/26 for projects which will now not be completed until 2026/27.  
2.7 Receipts from the sale of assets are currently projected to be £2.191m, which is 
£1.184m less than the budget of £3.375m. This results in a corresponding increase in 
the borrowing requirement for 2025/26. These receipts will continue to be closely 
monitored throughout the remainder of the financial year. 
General Services Total Expenditure 
2.8 As indicated in Table 1 the General Services investment programme is £181.871m. At
Period 10, the provisional outturn spend is £6.844m lower than current programme.
Further analysis by service/programme is outlined below and summarised within
Appendix 2 
2.9  Enterprise and Communities is projecting outturn expenditure of £167.029m, which
is a £5.561m variance from current programme.  
2.10 Within Community Operations, there is an in-year variance of £1.221m primarily 
resulting from the Roads and Streetlighting theme (£1.843m) mainly as a result of 
delays due to additional work required for LED lighting designs and the prioritising of 
works recently approved for School walking routes. There is also a delay in Road 
Signage works due to resourcing issues within the team and works on carparks being 
identified. Within Parks Master Plan theme there is a variance of £0.246m which 
primarily relates to the Bothwellhaugh Cottage project (£0.233m) with the delivery of 
the new unit now expected to take place in the new financial year. The Greenspace 
and Climate Resilience and Wellbeing theme is projected to be £0.279m less than 
budget, reflecting delays in the delivery of outstanding projects. These delays are 
attributable to reduced staff capacity in Quarter 4 and slower-than-expected internal 
consultation on proposed changes to grassland management regimes. These 
variances are partly offset by in-year cost pressures within the Greenspace and 
Cemeteries theme of £0.973m, largely driven by additional costs associated with the 
new Pather Cemetery development (£0.840m) which have arisen from challenging
Page 114 of 248

Page 115

ground conditions requiring complex civil engineering solutions, design changes to both 
the visitor building and landscaping, and ongoing issues with the sourcing of materials. 
2.11 Other cemetery development projects (£0.473m) are also being accelerated to scope 
future projects to address the burial space needs. These variances have been partly 
offset by variances within Tree Asset Management (£0.351m) due to internal 
resourcing issues. In addition, within the Operational and Infrastructure Development 
theme, there is a variance of £0.253m, primarily relating to the Vehicle Replacement 
Programme projecting acceleration (£0.509m) to alleviate revenue budget pressures 
on external hires partly offset by works to the office area within Fleet Workshop 
(£0.255m) which are now expected to take place in 2026/27. 
2.12 Within Assets and Procurement, an in-year variance of £2.480m is forecast. Of this, 
£1.320m relates to the ASN theme, where a number of projects are now expected to 
complete in 2026/27, including Hunter Street (£0.191m), refurbishment of Children’s 
Houses (£0.200m), Carnbroe Construction (£0.241m), Carnbroe Outdoor Works 
(£0.300m), delivery of enhanced provision for the Bothwellpark ASN Hub (£0.476m), 
which is subject to statutory approval and partly offset by increased expenditure at 
Edward Lawson Centre (£0.141m) due to additional works required to support the 
opening of the centre.   Within the Sustainable Estate theme, a projected variance of 
£0.536m primarily reflects additional capacity works at Glenboig Primary School, with 
the project not expected to commence in the current financial year pending finalisation 
of legal agreements. Within Maintaining Assets theme, a projected variance of £0.660m 
largely due to the windows project at Holy Cross Primary School (£0.342m) where the 
scope of works is still under review and is not expected to commence until summer 
2026, Re-roofing projects (£0.554m) due to projects at Shotts Community Centre and 
Morningside Primary School now expected to commence in 2026/27, Re-wiring 
projects (£0.200m) due to Glencryan Primary School as costs were less than originally 
anticipated, Toilet upgrades (£0.118m) due to works at St Gerards PS now expected 
to commence  in summer break of 2026, and partly offset by increased spend at 
Edward Lawson Centre (£0.434m) due to additional works required to support the 
opening of the centre.  Within Curriculum Development theme, a projected variance of 
£0.249m is mainly due to the PE changing and flooring project at Brannock High School 
(£0.115m) due to works starting in February 2026, with only one month falling in the 
current financial year, and the project continuing into 2026/27. There is also an in-year 
variance of £0.150m within the Targeted Investment theme, primarily due to the 
Chapelside Primary School toilets project. The project is now expected to start at the 
end of the current financial year, resulting in it extending into 2026/27. These variances 
are partly offset by an in-year variance of £0.313m within Demolitions theme, due to 
various minor variances within the programme. 
2.13 Within the Town & Community Hubs theme, the in-year variance of £0.896m is mainly 
attributable to St Kevins PS (£0.709m) as a result of delays in securing utility 
connections and other constraints affecting landscaping completion plus several minor 
variances across projects totalling £0.187m. 
2.14 Within Place, an in-year variance of £0.965m is forecast, driven primarily by the 
Infrastructure and Transportation Improvements theme, which is projecting an in-year 
variance of £1.184m. This reflects the award of additional, unanticipated external 
funding from the Tier 2 Active Travel Infrastructure Fund (£1.075m), alongside further 
Place Based Investment Programme (PBIP) funding allocated to the Kilsyth Flood Risk 
Reduction Scheme. In addition, there is a variance of £0.263m relating to staffing 
vacancies, however this has been fully offset by accelerated activity within Bridge Asset 
Management and the Allanton Minewater Treatment project. Within the Enterprise 
theme, a variance of £0.425m is forecast due to cost profiles for the Motherwell Town
Page 115 of 248

Page 116

Centre project being adjusted for required remedial works to address contractor defects 
(£0.381m). Further delays have arisen across other planned works due to ecological 
mitigation requirements (£0.045m). These variances are offset by additional costs of 
£0.645m being projected within Growth theme primarily driven by the accelerated 
acquisition of privately owned properties within the Centre Cumbernauld project the 
site and the progression of essential maintenance works (£0.422m) plus remediation 
works required at the Main Street, Coatbridge demolition due to flood and fire damage 
and identification of asbestos (£0.107m). 
2.15 Committed expenditure of £155.487m is currently reported, which represents 93.09% 
of the targeted expenditure, and actual expenditure is £109.506m which represents 
65.56% of targeted expenditure. 
2.16 Chief Executives is projecting outturn expenditure of £6.114m, which is a £0.803m
variance from current programme. 
2.17 Finance and Technology are currently projecting an in-year variance of £0.803m,
primarily due to Line of Business (LOB) projecting a variance of £0.485m due to
Technology receiving re-profiling requests from services in relation to the
Revenues/Benefits upgrade, Psychological Services Apex replacement, Active &
Creative Booking System and In-Cab Technologies Programme. In addition, there are
variances of £0.282m in Digitisation & Innovation due to timing of works associated
with Mobile Phone Coverage, Connectivity, BI Hub and scanning project and £0.036m
in End User Device due to timing of works associated with the Immersive Rooms
programme. 
2.18 Committed expenditure of £4.370m is currently reported, which represents 71.37% of 
the targeted expenditure. Actual expenditure is £1.972m, which is 32.21% of targeted 
expenditure. 
2.19 Adult Health & Social Care is projecting outturn expenditure of £1.884m, which is
which is a £0.480m variance from current programme. 
The variance is due to uncertainties in both demand and complexity of need. The
budget will continue to be monitored closely, and any forecast movements will be
highlighted in future reports.
Committed expenditure of £1.201m is currently reported, which represents 63.75% of
the targeted expenditure, and actual expenditure is £0.842m which is 44.69% of
targeted expenditure. 
HRA Capital Investment 
2.20 The financial performance of the HRA Capital Programme is reported in detail to the
Housing Committee. A summary of performance as at 2 January 2026 is provided at
Appendix 3.  
2.21 Total expenditure of £140.517m is forecast for 2025/26 which is an increase in 
programmed expenditure of £2.871m. 
This is due to higher than projected costs within the New Supply of £2.871m due to an 
increase in in-year acquisitions within the Buy-Back programmes as a result of 
accelerated spend and an increase in the cost of properties being purchased. 
2.22 Committed expenditure of £139.242m is currently reported, which represents 99.09% 
of the targeted expenditure, and actual expenditure is £86.809m which is 61.78% of 
targeted expenditure. 
Page 116 of 248

Page 117

3. Measures of success 
3.1  N/A   
4. Supporting documentation 
4.1 Appendix 1: Strategic Capital Investment Programme 2025/26 budget movements
4.2 Appendix 2: General Services Capital Investment Programme Summary 2025/26
4.3 Appendix 3: HRA Capital Investment Programme Summary 2025/26 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 117 of 248

Page 118

5.         Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The financial impact is outlined within the report
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 118 of 248

Page 119

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Despite the updated programme approved at Policy and Strategy Committee in
March 2024 the capital programme continues to face challenges in relation to the
wider economic climate, linked to availability of materials, contractors and
inflationary pressures. These are currently being managed by services and Project
Boards associated with specific programme delivery and will continue to be
monitored throughout the year in accordance with the SCDG Terms of Reference
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 119 of 248

Page 120

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 120 of 248

Page 121

2025/26 Strategic Capital Investment Programme – budget movements                                                                                        Appendix 1 
Enterprise &
Communities
Chief
Executives
Adult Health
&Social Care Corporate
Total General
Services
Investment
Programme
Total HRA
Investment
Programme
Total
Community
Investment
Programme
£000s £000s £000s £000s £000s £000s £000s
25/26 Opening programme approved Policy& Strategy Committee March 25 159,022 7,809 2,200 1,104 170,135 140,146 310,281
24/25 Overs/Unders Carry Forward 16,049 1,921 164 0 18,134 0 18,134
25/26 Budget adjustments approved by SCDG 230 0 0 0 230 0 230
Increase/(Decrease) in Externally Funded Projects 6,841 10 0 0 6,851 0 6,851
Increase/(Decrease) in Council Funded Projects (261) 0 0 0 (261) 0 (261)
Increase/(Decrease) in CFCR 1,244 59 0 0 1,303 0 1,303
25/26 Budget adjustments to be approved by SCDG (937) 969 0 3,500 3,532 0 3,532
25/26 Acceleration of projects from future years approved by SCDG 6,844 0 0 0 6,844 0 6,844
25/26 Re-profiling of projects to future years approved by SCDG (16,442) (3,851) 0 (4,604) (24,897) (2,500) (27,397)
25/26 Re-profiling of projects to future years to be approved by SCDG 0 0 0 0 0 0 0
Revised Capital Programme 2025/26 172,590 6,917 2,364 0 181,871 137,646 319,517
Page 121 of 248

Page 122

General Services Capital Investment Programme Summary 2025/26 - as at 31 March 2026 Appendix 2
Investment Current
Programme
2025/26
£000s
Projected
Outturn
2025/26
£000s
Outturn
Variance
2025/26
£000s
Committed
Expenditure
@ P10          
£000s
Committed
Expenditure 
% of
Projected
Outturn
Actual
Expenditure 
@ P10      
£000s
Actual
Expenditure      
% of
Projected
Outturn
Enterprise & Communities 172,590 167,029 5,561 155,487 93.09% 109,506 65.56%
Chief Executives 6,917 6,114 803 4,370 71.48% 1,972 32.25%
Adult Health & Social Care 2,364 1,884 480 1,201 63.75% 842 44.69%
Total General Services Investment 181,871 175,027 6,844 161,058 92.02% 112,320 64.17%
General Services Resources;
External Grants & Contributions 2025/26 - GCG 47,637 47,637 0
External Grants & Contributions 2025/26 - Other Grants 13,638 13,638 0
External Grants & Contributions b/f 2024/25 - Other Grants 7,924 7,924 0
External Grants & Contributions Unapplied cfwd to 2026/27 (2,673) (2,673) 0
Net External Grants & Contributions 66,526 66,526 0
City Deal Grant 3,792 3,792 0
CFCR 7,501 7,501 0
Capital Receipts 3,375 2,191 (1,184)
Total Resources  81,194 80,010 (1,184)
Borrowing Requirement: 
General Services 100,677 95,017 (5,660)
Total General Services Borrowing Requirement 100,677 95,017 (5,660)
Total Resources incl Borrowing Requirement 181,871 175,027 (6,844)
Page 122 of 248

Page 123

HRA Capital Investment Programme Summary 2025/26 - as at 31 March 2026 Appendix 3
Investment Current
Programme
2025/26
£000s
Projected
Outturn
2025/26
£000s
Outturn
Variance
2025/26
£000s
Committed
Expenditure
@ P10       
£000s
Committed
Expenditure      
% of Projected
Outturn
Actual
Expenditure
@ P10     
£000s
Actual
Expenditure      
% of
Projected
Outturn
Mainstream Programme 83,730 83,730 0 83,208 99.38% 53,902 64.38%
New Build Programme 41,919 41,919 0 41,919 100.00% 22,120 52.77%
Council Buy Back Scheme 11,997 14,868 (2,871) 14,115 94.94% 10,787 72.55%
Total HRA Investment 137,646 140,517 (2,871) 139,242 99.09% 86,809 61.78%
HRA Capital Resources;
External Grants & Contributions 23,754 32,653 8,899
External Grants & Contributions Unapplied 0 0 0
Net External Grants & Contributions 23,754 32,653 8,899
CFCR 23,155 25,632 2,477
Capital Receipts 0 5 5
Total Resources 46,909 58,290 11,381
Borrowing Requirement:
HRA - Mainstream 65,245 60,048 (5,197)
HRA - New Build 18,537 16,520 (2,017)
HRA - Buyback Scheme 6,955 5,659 (1,296)
Total Borrowing Requirement 90,737 82,227 (8,510)
Total Resources incl Borrowing Requirement 137,646 140,517 2,871
Page 123 of 248

Page 124

Page 124 of 248

Page 125

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/PH/PF Date 04/03/26 
Chief Executive Service – Capital Monitoring Report 1 April to 02
January 2026 (Period 10) 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 01698 302408 
Executive Summary
This report highlights the financial performance and projected outturn of 2025/26 Chief
Executive Service’s capital programme for the period ended 02 January 2026 (Period 10). 
In summary the service has a total capital budget of £6.917m, comprising of £4.666m within
Finance and Technology and £2.251m within Strategy and Engagement. This budget
reflects the budget approved by the Policy and Strategy Committee in March 2025,
additional Scottish Government Play Area funding, external funding, balances carried
forward from previous years, and subsequent decisions made at the Strategic Capital
Delivery Group (SCDG) in relation to reprofiling. 
The Service is currently projecting a year-end underspend of £0.803m at this stage of the
financial year.   Further explanation of management action taken by the Service is included
within the main report and attached appendices. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Considers the financial position of the 2025/26 Chief Executive Service capital
programme.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 11
Page 125 of 248

Page 126

1. Background 
1.1 This report provides a summary of the Chief Executive Service financial performance
for the period 1 April 2025 to 02 January 2026 (Period 10), with major outturn variances
highlighted and explained per the Council’s approved Financial Regulations. 
1.2 The Council approved its Capital programme at Policy and Strategy Committee on 13
March 2025 with an allocated budget of £7.809m for the current year.  In addition, carry
forwards from the previous year, Scottish Government funding for Play Areas, external
funding from community groups and decisions made at SCDG in relation to reprofiling
have resulted in a revised Capital Programme of £6.917m for the 2025/26 Financial
Year as detailed in Appendix 1 of this report.
1.3 The Council’s approved Financial Regulations required the Chief Executive to remain
within his approved budgetary provision, and to report all significant deviations –
defined as the higher of £0.100m or 5% - within their budget monitoring reports.  Where
significant deviations are identified, Chief Officers must provide explanatory
commentary, outline the action required to rectify such deviations and where relevant,
must also highlight the impact this has on other budget headings. 
2. Report 
Summary of Financial Position 
2.1 The Service is projecting a year-end underspend of £0.803m for the financial year
2025/26. Capital budgets and expenditure are summarised in Appendix 1. 
Analysis of Significant Variances 
2.2 An explanation of variances within Finance and Technology is detailed below. 
• Digitisation and Innovation
An underspend of £0.282m is projected due to timing of works associated with
Mobile Phone Coverage, Connectivity, the BI Hub and scanning project. 
• Line of Business (LOB) 
Technology is projecting a net underspend of £0.485m in relation to timing of works
in relation to the Revenues/Benefits upgrade, Psychological Services Apex
replacement, the Active & Creative Booking System and utilising alternate capital
funding within Enterprise and Communities to support the In-Cab Technologies
Programme. 
• End User Device
As a result of timing of works associated with the Immersive Rooms programme,
an underspend of £0.036m is anticipated. 
• Innovation
Following the launch of this initiative, only 1 request has been received within the
current financial year. 
2.3 Strategy and Engagement are currently projecting a break-even position following
SCDG approval to reprofile the budget due to timing of tender awards for play areas
and surfacing works and Community Hub improvements, which are scheduled to align
with school holiday periods. 
Page 126 of 248

Page 127

Management Action 
2.4 The Service closely monitors all activities to ensure available budgets are maximised
whilst monitoring and actively managing the ongoing external challenges in delivery of
projects.  The Service continues to review the programme with updates being provided
to the SCDG and Committee. 
3. Measures of success 
3.1  The Service aim is to operate within approved budget resources over the term of the
capital programme. 
4. Supporting documentation  
4.1 Appendix 1 Summary Expenditure by Project / Theme 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 127 of 248

Page 128

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
As stated within the main body of the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 128 of 248

Page 129

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.9.1 All activities undertaken by the Council are subject to risk, and in
acknowledging the Council’s approved Risk Management Strategy. Services
manage these as part of their overall corporate and service planning
processes.  The current economic climate, in particular, has the potential to
impact upon the Council’s ability to provide quality services within approved
budget levels. 
5.9.2 To minimise risk this report was prepared by Finance personnel in
consultation with budget managers, in accordance with the Financial
Regulations. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 129 of 248

Page 130

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 130 of 248

Page 131

Page 131 of 248

Page 132

Page 132 of 248

Page 133

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/KS/FC Date 04/03/26 
Review of 2025/26 to 2027/28 Budget Savings 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 07583 010692 
1. Background 
1.1. At its meeting of 20 February 2025, the Council approved a General Fund Revenue
Budget of £1,095.241m including expenditure budgets which will be offset by ring
fenced grant resources of £15.296m, resulting in a net expenditure position for
monitoring purposes of £1,079.945m.  After reflecting changes in Scottish Government
funding and other approved changes, the overall total budget is now £1,063.795m. 
1.2. Net savings totalling £5.401m over the financial years 2025/26 to 2027/28 were agreed
within the budgets set on 15 February 2024 and 20 February 2025, with £4.183m
incorporated into the 2025/26 budget and the balance £1.218m in 2026/27.  In addition,
Executive Summary 
This report provides the Finance and Resources Committee with an update on the
achievement of the three-year financial savings total of £8.326m approved as part of the
2025/26 budget setting process (£6.628m 2025/26, £1.393m 2026/27 and £0.305m in
2027/28).   
It is projected that £5.894m of the 2025/26 savings (89%) will be delivered within the
financial year, with replacement savings identified to fully address the shortfall of £0.734m. 
In addition, it is currently anticipated that there will be no recurring savings gap arising
from the 2025/26 to 2027/28 approved savings.   
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the contents of this report.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Item 12
Page 133 of 248

Page 134

Council/Committee decisions of £2.924m have also been agreed over the three-year
period, £2.445m of which will be realised in 2025/26. 
1.3. Services are required to monitor the delivery of their target savings to ensure they
remain within approved budgets and provide periodic progress updates within
individual Service revenue monitoring reports, identifying alternative solutions to any
in-year shortfall envisaged.  In addition, Services are required to monitor whether the
original approved saving has been implemented and if not, provide an explanation
along with alternative action required to ensure the recurring financial saving will be
achieved going forward. 
1.4. This report summarises the progress in achieving approved savings for the three-year
period 2025/26 to 2027/28. 
2. Report 
Update on Approved 2025/26 to 2027/28 Savings 
2.1 A summary of the three-year approved savings is provided at Appendix 1 along with
the current forecast of savings achievable for each of the years.   
2.2 It is currently anticipated that £5.894m (89%) of approved 2025/26 savings of £6.628m
will be achieved in the current financial year, leaving an in-year savings gap of £0.734m. 
Replacement savings and funding have been identified to fully address the shortfall,
which includes management action such as control of vacancies, curtailment of
expenditure and the use of Earmarked Reserves.  Appendix 2 provides more
information on the unachievable savings within 2025/26, across the services.  More
detailed information in relation to savings is reported through the relevant service
committee. It should be noted that there is no anticipated recurring budget impact as a
result of the in-year savings gap. 
2.3 It is currently anticipated that £1.070m (77%) of approved 2026/27 savings of £1.393m
will be achieved in the 2026/27 financial year, leaving an in-year savings gap of
£0.323m. It is anticipated that these savings will be achieved in future years and thus
no recurring gap has been identified.  Appendix 2 provides more information on the
unachievable savings within 2026/27, across the services. These will continue to be
monitored with updates reported to Committee as appropriate.       
3. Measures of success 
3.1  The Council continues to operate within approved budgeted resources.   
4. Supporting documentation 
4.1 Appendix 1 Approved 3 Year Savings Summary 
4.2 Appendix 2 Budget Savings by Exception 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 134 of 248

Page 135

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 135 of 248

Page 136

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 136 of 248

Page 137

Service
Approved
Saving
£m
Projected
Savings
£m
In-year
Savings
Gap
£m
Recurring
Gap
£m
Approved
Saving
£m
Projected
Savings
£m
In-year
Savings
Gap
£m
Recurring
Gap
£m
Approved
Saving
£m
Projected
Savings
£m
In-year
Savings
Gap
£m
Recurring
Gap
£m
Approved
Saving
£m
Projected
Savings
£m
In-year
Savings
Gap
£m
Recurring
Gap
£m
Chief Executive's 0.793 0.793 0.000 0.000 0.735 0.652 0.083 0.000 0.000 0.000 0.000 0.000 1.528 1.445 0.083 0.000
Enterprise & Communities 3.492 3.119 0.373 0.000 0.440 0.200 0.240 0.000 0.305 0.305 0.000 0.000 4.237 3.624 0.613 0.000
Education & Families 2.343 1.982 0.361 0.000 0.218 0.218 0.000 0.000 0.000 0.000 0.000 0.000 2.561 2.200 0.361 0.000
Other Corporate 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Total Service Savings 6.628 5.894 0.734 0.000 1.393 1.070 0.323 0.000 0.305 0.305 0.000 0.000 8.326 7.269 1.057 0.000
Appendix 1
North Lanarkshire Council
Approved 3 Year Savings Summary
Service Savings Monitoring
TOTAL2027/282025/26 2026/27
Page 137 of 248

Page 138

Appendix 2
North Lanarkshire Council
Review of Budget Savings by Exception
Service Division Saving Detail
Approved
Saving
£m
Projected
Savings
£m
In Year
Savings Gap
£m
Recurring
Gap
£m
E&C Community Operations Fleet MOT's 0.200 0.000 0.200 0.000
E&C Assets & Procurement Asset Management Rationalisation/Office Dis-investment. 0.173 0.000 0.173 0.000
E&F Children & Families Review of C&F and ASC Business Admin & Support Model 0.280 0.140 0.140 0.000
E&F Community Learning Review of CLD delivery service, including the provision of
youth diversionary activities 0.883 0.662 0.221 0.000
Total Savings 1.536 0.802 0.734 0.000
Service Division Saving Detail
Approved
Saving
£m
Projected
Savings
£m
In Year
Savings Gap
£m
Recurring
Gap
£m
Chief
Exec People Resources Implementation of staffing restructure 0.207 0.124 0.083 0.000
E&C Assets & Procurement Active & Creative Communities rationalisation savings 0.266 0.200 0.066 0.000
E&C Hospitality & Catering Non-Schools Hospitality & Catering Savings 0.174 0.000 0.174 0.000
Total Savings 0.647 0.324 0.323 0.000
2025/26
2026/27
Page 138 of 248

Page 139

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    GT / PH Date 04/03/26 
Local Taxation Debt Write-Off 2025/26 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 
Executive Summary
The purpose of this report is to present to Committee the summary of outstanding local
taxation accounts which are deemed uncollectible following all attempts at recovery. In
accordance with financial guidelines a provision for credit losses has previously been
established for the outstanding accounts. The total recommended for write-off in 2025/26
is £3,586,287.97. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the decision of the Chief Officer (Finance and Technology) to write off
£982,058.33 for debts under £500 under delegated responsibilities. 
(2) Approve the write-off of all items over £500 to the value of £2,604,229.64.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work Statutory / corporate / service requirement
Item 13
Page 139 of 248

Page 140

1. Background 
1.1 For the financial year 2025/26, the Council has billed £193m for Council Tax and £140m
for Non Domestic Rates charges.   
1.2 The Council follows best practice and legislation in relation to the recovery of
outstanding charges for Council Tax (including water and sewerage charges) and Non
Domestic Rates. This includes issuing reminder letters, agreeing payment plans with
individuals and business and passing outstanding debt to the Council’s contracted
Sheriff Officer, Walker Love, for further recovery action. 
1.3 Despite these processes there are a number of debts that are deemed uncollectible.
This annual process of assessing the likelihood of debt non-recovery conforms to
accepted best accounting practice and reflects a reasonable assessment of expected
income. 
1.4 Despite the recommendation for write-off, there will continue to be an appraisal of
outstanding balances to re-assess those which are deemed uncollectible, especially
where circumstances may have changed. 
2. Report 
2.1 An analysis of outstanding balances has been conducted and £3,586,287.97 has been
identified as uncollectible: 
Cause Analysis Council Tax 
£
Non Domestic
Rates
£
Total 
£
Deceased 1,416,813.51 4,278.77 746,888.19
Liquidation /
sequestration etc
1,045,857.00 1,119,338.69 1,118,405.69
Total 2,462,670.51 1,123,617.46 3,586,287.97    
Value Analysis   
< £500 968,669.92 13,388.41 982,058.33
>£500 1,494,000.59 1,110,229.05 2,604,229.64
Total 2,462,670.51 1,123,617.46 3,586,287.97 
2.2 The values written off during 2024/25 were as follows: 
Cause Analysis Council Tax 
£
Non Domestic
Rates
£
Total 
£
Deceased 746,888.19 0.00 746,888.19
Liquidation /
sequestration etc
300,721.67 817,684.02 1,118,405.69
Total 1,047,609.86 817,684.02 1,865,293.88 
Page 140 of 248

Page 141

2.3 Collection of local taxation is sought from all payees in the year of liability and
subsequent years with use of diligence as appropriate. The level of in year collection is
reported to each committee cycle and monitored on an ongoing basis. 
2.4 Over time the collection of outstanding sums is prevented where there is no longer any
legal basis to collect. This occurs where a person or business is subject to a
sequestration, bankruptcy, winding-up or where the estate of the deceased has no
funds to meet the debt and there is no other liable party. 
2.5 Council Tax debt for years up to and including 2018/19 have been fully provided for
and as such there is no costs to the Council associated with the write-off of these debts.
For subsequent years, the Council has made an assessment of likely irrecoverable
debts. This assessment is subject to ongoing review as part of regular monitoring of
the Council Tax position and a consideration in completing the Council’s statutory
accounts each year. 
2.6 There is no cost of the Council in respect of the Non Domestic Rates write off as this is
accounted for in the pooled funding arrangements with Scottish Government. 
3. Measures of success 
3.1  The Council continues to take all reasonable steps to recover outstanding debt. 
4. Supporting documentation 
Not applicable. 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 141 of 248

Page 142

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The write off of more recent Council Tax debts has the potential to impact on the in
year Council income position. However, this is subject to ongoing monitoring of the
overall Council Tax position and will be finalised as the Council completes its
statutory annual accounts for 2025/26.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 142 of 248

Page 143

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 143 of 248

Page 144

Page 144 of 248

Page 145

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/KS/RM Date 04/03/26 
Treasury Management Monitoring Report for quarter ended 31
December 2025 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone Ryan McNamee, Finance
Manager 
Executive Summary
This report fulfils the key requirements of the Council’s reporting procedures for Treasury
Management in accordance with the CIPFA Code of Practice on Treasury Management
and the CIPFA Prudential Code for Capital Finance in Local Authorities. It informs on the
quarterly Treasury Management activity for the period 1 October 2025 to 31 December
2025 and compliance with the mandatory treasury and prudential indicators. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the Treasury Management activity for the quarter ended 31 December
2025 including the performance against the key treasury and prudential indicators. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 14
Page 145 of 248

Page 146

1. Background 
1.1 The Council manages its treasury activities in line with the CIPFA Code ‘Treasury
Management in the Public Services’. The Code requires the Council to produce reports
on its Treasury Management policies, practices and activities on a regular and ongoing
basis. The Council fulfils these obligations, in part, by the preparation of this Treasury
Management Monitoring report produced on a quarterly basis, encompassing a review
of performance. 
1.2 The Council’s “Treasury Management Strategy 2025/2026 and Treasury and
Prudential Indicators 2025/2026 to 2029/2030” was approved by Committee at its
meeting on 26 February 2025. The Treasury activity undertaken in the first quarter of
2025/26 reflects the key requirements of the Council’s 2025/26 Treasury Management
Strategy, with the Public Works Loan Board (PWLB) and Long-term Money Market
being the prime source of long-term funds. In terms of investment activity, this is
conducted in accordance with the approved 2025/26 investment strategy. 
2. Report 
Summary Position 
2.1.  The net overall borrowing position to 31 December 2025 is £1,228.6m, an increase of
£33.9m from the position at 30 September 2025.  A detailed breakdown of the net cash
movement is shown in column (6) within Appendix 1 and is discussed below. 
Borrowing 
2.2. At the end of the quarter, total external debt amounted to £1,333.8m, an increase of
£70.2m. This was primarily due to additional net long-term borrowing of £63.1m being
undertaken, comprising new PWLB borrowing of £85.0m, offset by the repayment of
existing PWLB debt of £21.9m, repayment of a £2.0m LOBO loan and a £0.1m
repayment of energy efficiency loans. 
2.3. During the quarter, the Council sourced PWLB loans totalling £85.0m on an equal
instalment payment (EIP) basis, which provides a smoother debt maturity profile, thus
spreading the refinancing risk. The EIP loans were sourced at interest rates ranging
from 4.11% to 4.16% over a five-year repayment period and were sourced taking
advantage of the PWLB HRA rate (see para 2.2.6).   
2.4. In addition, there was an increase in net temporary borrowing of £12.5m, due to £60.0m
falling due for repayment being offset by £72.5m of new borrowing.  There was also a
£3.3m reduction in long term liabilities due to existing finance lease and Service
Concession obligations falling due for repayment. 
2.5. The Council’s approach to borrowing is in line with the approved strategy which aims
to source long-term borrowing and take advantage of temporary (short-term) borrowing
at attractive rates, and where possible, using internal cash balances, to meet the
principal repayments, daily revenue account requirements and the capital financing
requirement, in lieu of borrowing for capital purposes. The strategy adopted considers
interest rate forecasts, the management of carrying costs and the retention of cash
balances at appropriate levels, whilst managing the associated investment, interest,
and liquidity risk. 
2.6. The Council made a successful application to the PWLB to access the certainty rate
which allows a 20-basis point (bps) (0.20%) discount on loans from the PWLB under
Page 146 of 248

Page 147

the prudential borrowing regime. This will continue to provide the Council with an
opportunity to borrow from the PWLB at more beneficial rates until 31 March 2026. 
2.7. A new PWLB HRA rate, which is 0.40% below the certainty rate, has been available
from 15th June 2023, which has been extended until March 2026 in the UK Budget in
October 2024, to support local authorities borrowing for Housing capital purposes or
refinancing existing loans. In conjunction with our treasury advisors, we continue to
review borrowing requirements and assess borrowing opportunities for the Council
during 2025/26. 
2.8. The CIPFA Prudential Code is clear that local authorities must not borrow to invest
primarily for financial return and that it is not prudent for local authorities to make any
investment or spending decision that will increase the capital financing requirement and
so may lead to new borrowing, unless directly and primarily related to the functions of
the Council. The Council is compliant with this requirement.  Members should note also
that PWLB loans are no longer available to local authorities planning to buy investment
assets primarily for yield.   
2.9. Members will be aware interest rates have risen significantly over the past 2 years,
increasing materially the cost of both short and long-term borrowing. In this quarter, the
Bank of England (BoE) reduced the Bank Rate to 3.75% in December. The cost of new
short-term borrowing from other local authorities has been similar to Bank Rate during
the period at 4.00% to 4.50%. The Council’s short-term borrowing cost has reduced
slightly over the period in line with Bank Rate and short-dated market rates. The
average rate on the Council’s current short-term loans portfolio of £229.0m at 31st
December 2025 was 4.40%, this compares with 4.55% on £216.5m loans in the
previous quarter. 
2.10. After substantial rises in interest rates since 2021 central banks have now begun to
reduce their policy rates, albeit slowly. Except the much long term gilt yields have
decreased slightly over the period, reflecting expectations of lower interest rates, a
tepid economy and to some extent an improvement in the UK governments fiscal
position following tax rises in the autumn budget. 
2.11. The PWLB certainty rate for 10-year maturity loans was 5.54% at the beginning of the
period and 5.34% at the end. The lowest available 10-year maturity rate was 5.21%
and the highest was 5.57%. Rates for 20-year maturity loans ranged from 5.80% to
6.19% during the period, and 50-year maturity loans ranged from 5.65% to 6.04%. 
Debt Restructuring 
2.12.  In conjunction with our Treasury advisors, we monitored the economic climate in
relation to our financial targets and Treasury Management Strategy, for the quarter
under review. The interest rates prevailing throughout the period resulted in no
beneficial opportunities for debt restructuring/rescheduling of the existing PWLB debt
portfolio arising. 
2.13. During the period, a LOBO (Lender’s Option Borrowers Option) loan of £2.00m was
due for redemption and repaid at the end of the contractual period. 
2.14. The Council continues to hold £1.0m of LOBO loans where the lender has the option
to propose an increase in the interest rate at set dates, following which the Authority
has the option to either accept the new rate or to repay the loan at no additional cost.
As market interest rates have risen, there was increased probability of call options on
Page 147 of 248

Page 148

the LOBOs being exercised by lenders, however, no lender exercised their option
during the quarter. 
2.15. Further reports regarding future activity will be presented to Committee as appropriate. 
Investments  
2.16. Treasury management investments arise from cash flows or treasury risk management
activity, that results in balances being invested, until the cash is required for use in the
course of business. 
2.17. At the end of the third quarter of 2025/26, the Council held total investments of
£105.2m, which is a net increase of £36.3m in cash and cash equivalents, primarily
due to a £41.4m increase in short-term investments held, reflecting maturing temporary
investments of approximately £403.8m, and undertaking new short-term investments
of £445.2m, and a movement in uncleared balances due to timing differences including
cash in transit of £5.1m. See summary at Appendix 1, column 6. 
2.18. At quarter end the uncleared balances including cash in transit was £8.2m which is a
net deficit position, a reduction of £5.1m compared to the position reported at the end
of the previous quarter of a net deficit position of £3.1m.  This primarily reflects the
timing of significant BACS receipts and payments. The balance at 31 December 2025
comprises £8.1m of net BACS debits outstanding due for clearance within 3 days of
the quarter end date and cheques unpresented of £0.1m. 
2.19. In line with the approved strategy to manage liquidity, the Council aims to maintain a
minimum balance of £30.0m available on an overnight basis (instant access), ensuring
a prudent level of funds is maintained to meet all service requirements. 
2.20. During the quarter, the Bank of England’s Monetary Policy Committee (MPC) voted to
reduce the Bank Rate by 0.25% to 3.75%, which resulted in short-dated cash rates also
reducing, with rates ranging between 3.98% in late October to 3.65% in late-December,
a reduction of 0.33% for overnight/7-day maturities. There is little noticeable difference
between the 7 day and 1-month SONIA (Sterling Overnight Rate) bid rates and
generally available investment rates offered by financial institutions and money market
funds. Despite this, the Council will endeavour to achieve good performance levels in
investment activity. 
2.21. Overall, the Treasury Management team continues to take a prudent approach to
investing surplus funds in line with the approved 2025/26 Investment Strategy. Security
of investment and ensuring sufficient liquidity are key investment criteria governing
Council investment decisions. This approach is aligned to the prudent management of
current commitments and future cash demands based on latest robust cashflow
projections.  During the quarter, the rates on Debt Management Account Deposit
Facility (DMADF) deposits ranged between 3.71% and 3.97% and money market rates
between 3.82% and 4.09%. 
2.22 However, as demonstrated by the liability benchmark reported at (xi) below and
Appendix 3 attached, it is anticipated the Council will be a long-term borrower and
therefore new treasury investments are primarily made to manage day-to-day cash
flows using short-term low risk instruments. 
Page 148 of 248

Page 149

Non-Treasury Management Investments   
2.23. During the quarter, repayments of £0.01m were made in respect of third-party
advances in connection with the Cumbernauld Academy DBFM and Greenfaulds
DBFM. 
Interest Rate Movements & Other Economic Updates 
2.24. As outlined by our treasury management advisors, the first quarter of the year was
dominated by the fallout from the US trade tariffs and their impact on equity and bond
markets. While this was reversed somewhat in the second quarter with equity markets
making gains, it also saw a divergence in US and UK government bond yields. UK
yields persisted at higher levels as investors demanded higher returns in the form of
term premia due to the more uncertain UK fiscal and economic position. The latter part
of the period included the government’s November autumn Budget. Despite much
speculation and drip-feeding of potential policies in the weeks leading up to the event,
what was ultimately announced was generally deemed more muted than had been
anticipated, helping ease investors’ fears of significantly higher government borrowing. 
2.25. UK headline consumer price inflation (CPI) decreased over the quarter, falling from an
annual rate of 3.8% in August to 3.2% in November, but still well above the Bank of
England’s 2% target. Core CPI inflation eased, from 3.6% to 3.2% over the same
period. Services inflation also fell from August to November, to 4.4% from 4.7%. 
2.26. Data released during the period by the Office of National Statistics (ONS) showed the
UK economy expanded by 0.1% in the third quarter of the calendar year, following 0.7%
and 0.3% growth in the first two quarters. Of the subsequent monthly figures, the ONS
estimated that GDP fell by 0.1% In October. 
2.27. The labour market continued to ease over the period as unemployment rose, vacancies
fell and inactivity remained flat. In the three months to October 2025, the unemployment
rate rose to 5.1%, higher than the level previously expected by the BoE, while the
employment rate slipped to 74.9%. Regular earnings (excluding bonuses) was 4.6%
3mth/yoy for Aug to Oct which is a 0.1% decrease from last quarter whilst total earnings
was 4.7% which is a 0.4% reduction from last quarter. 
2.28. The BoE’s Monetary Policy Committee (MPC) voted 5-4 to cut Bank Rate to 3.75% in
December 2025, as was expected. Policymakers wanting a cut judged that disinflation
was established while those preferring to hold Bank Rate at 4% argued that inflation
risks remained sufficiently material to leave it untouched at this stage. 
2.29. The November BoE Monetary Policy Report projected GDP would expand by a modest
0.2% in calendar Q4 2025. Estimates of inflation in the report were quickly out of date
when CPI fell quicker than expected in November. Predictions of a modestly growing
economy were echoed by the Office for Budget Responsibility in its Economic and
Fiscal Outlook published with the Autumn Statement which revised down its estimate
of annual GDP to around 1.5% between 2025 and 2030. 
2.30. Our treasury management advisors held a central view that Bank Rate would be cut
further in 2025/26 with most BoE policymakers remaining more worried about weak
GDP growth than higher inflation. In line with Arlingclose’s central forecast, Bank Rate
was reduced to 3.75% in December. Further cuts are expected in 2026, with the central
forecast being that Bank Rate will be eased to around 3.25%. 
Page 149 of 248

Page 150

2.31. The US Federal Reserve continued cutting rates, reducing Fed Funds Rate target
range by 0.25% at its December meeting to 3.50%-3.75%. The meeting minutes noted
that most policymakers judged that further rate cuts would be likely in 2026 if inflation
continues to ease, however they were still divided in their assessment of the risks
between inflation and unemployment. The European Central Bank (ECB) held its key
interest rates in December for a fourth consecutive meeting, maintaining the deposit
rate at 2.0% and the main refinancing rate at 2.15%. The ECB maintained that future
policy decisions will remain data-dependent, that inflation is close to its 2% target and
that the euro area economy continues to expand despite a challenging global
environment, including heightened geopolitical risks and trade tensions. 
2.32. After declining sharply early in the year, sentiment in financial markets has been mostly
buoyant, but risky assets remained volatile. Bond yields initially declined early in the
year, but increasing uncertainty around the UK’s economic and fiscal outlook caused
medium and longer yields to rise. Yields remained elevated until the third quarter when
the potential negative impact of the UK Budget were deemed less than expected and
yields eased modestly. Equity markets gained the previous declines seen in the April
sell-off and have continued to rise, even in the face of ongoing uncertainty around the
existence of an AI-related ‘bubble’ and concentration in US and global stock markets. 
2.33. Over the period, the 10-year UK benchmark gilt yield started at 4.70% and ended at
4.48%. However, these three months saw significant volatility with the 10-year yield
hitting a low of 4.39% in late October and a high of 4.75% in early September. It was a
similar picture for the 20-year gilt which started at 5.39% and ended at 5.11% with a
low and high of 5.05% and 5.44% respectively. The Sterling Overnight Rate (SONIA)
averaged 3.94% over the three months to 31st December. 
2.34. Due to the cut in the Bank Rate during the period, short-term borrowing interest rates
reduced with the short term 7-day offer rate ranging between 3.83% and 4.16% over
the period. Taking account of the decrease in borrowing rates and advice from our
treasury management advisors, it continues to be considered more cost effective in the
near term to use a combination of internal resources or to borrow rolling temporary /
short-term loans at lower interest rates where possible rather than long term borrowing.
This will result in increased temporary borrowing costs for the Council partially offset
by increased investment income earned on surplus balances. 
2.35. The Treasury Management team will continue to monitor financial and economic policy
and their impact upon the Council’s investment and borrowing activity. 
The Prudential Code for Capital Finance in Local Authorities 
2.36.  The Local Government in Scotland Act 2003 requires the Council to undertake its
Treasury activities in line with the Prudential Code for Capital Finance in Local
Authorities. 
2.37. Committee, at its meeting on 26 February 2025, approved a report titled, “Treasury
Management Strategy 2025/2026 and Treasury and Prudential Indicators 2025/2026
to 2029/2030”. This report detailed a variety of mandatory and local indicators aimed
at assisting members to determine that proposed capital investment levels and treasury
management decisions satisfied the key requirements of affordability, prudence and
sustainability. Performance against key prudential indicators for 2025/26 to date is
detailed within Appendix 2. 
(i) Indicator 1(a) illustrates planned investment on capital expenditure is forecast to
be higher than initially anticipated by £17.4m in 2025/26. This reflects increases
Page 150 of 248

Page 151

of £2.8m in the General Fund capital investment and £15.0m for the HRA
Mainstream and New Build programmes partly offset by a decrease in Credit
Arrangements of £0.4m reflecting updated estimates of IFRS16 on service
concession contracts.  This is based on the updated ‘Strategic Capital Investment
Programme 2024-2025 to 2028-2029’ approved at Policy & Strategy Committee
on 13 March 2025 and the ‘Housing Outline HRA Capital Programme 2025/26’
approved at Housing Committee on 12 February 2025 and also incorporating any
subsequent profiling updates e.g. carry-forwards from final outturn 2024/25
programmes.  For further information, this is monitored in detail as part of the
Council's capital programme reporting mechanisms which will provide spend
details including any revisions to the estimates approved for 2025/26. 
(ii) The mix of resources required to finance the capital expenditure in 2025/26
reflects the updates on forecast capital investment. Therefore, the level of in-year
borrowing is anticipated to be lower by £2.4m due to decrease in General Fund
programme requirements of £7.6m offset by increase of £5.2m for HRA
programme. This forecast level of borrowing also reflects a net increase in capital
grants and external contributions of £38.0m with increased funds available to
General Fund of £28.0m and HRA programmes of £10.0m. A net decrease of
£16.1m in CFCR is also anticipated (General Fund decrease of £15.9m and HRA
of £0.2m) and a decrease in capital receipts of £1.7m within General Fund. 
(iii) IFRS 16 Leases was implemented in 2024/25. As a result of annual
remeasurement of PPP liabilities and Service Concessions, the accounting
impact is an estimated increased capital investment of £14.0m (increase to
capital financing requirement) to be recognised in 2025/26, which is a minor
decrease of £0.4m that initial estimates.  It should be noted that this is an
accounting adjustment and does not represent cash expenditure, which is offset
by an equal and opposite recognition of associated credit arrangements
financing. 
(iv) Indicator 1(b) – The Council’s cumulative outstanding amount of debt finance is
measured by the capital financing requirement (CFR). The CFR is essentially a
measure of Council’s underlying borrowing need i.e. capital expenditure not
resourced by capital grants, receipts or CFCR, with any new borrowing increasing
the CFR. The CFR is projected to rise to £1,699.4m within financial year 2025/26. 
(v) The Prudential Code requires the Council’s capital investment to be prudent and
affordable. To demonstrate this, a Prudential Margin (the need to borrow versus
actual borrowing) is calculated. Indicator 1(c) demonstrates a healthy prudential
margin of £255.6m estimated as at 31 December 2025. The timing and profile of
external borrowing to replenish cash reserves and balances are being managed,
giving full consideration to liquidity, interest rate and refinancing risk, whilst
minimising the potential carrying costs. 
(vi) Indicator 1(d) illustrates that both the overall Authorised Limit and Operational
Boundary limits for borrowing and long-term liabilities have not been exceeded,
with the maximum borrowing undertaken within the period being well below the
approved boundaries. 
(vii) Indicator 1(e) illustrates the financing costs forecasts as at 31 December 2025
for both general fund and HRA as a proportion of net revenue stream. Although
capital expenditure is not charged directly to revenue, interest payable on loans,
and loan fund and long-term liability repayments are.  The net annual charge is
Page 151 of 248

Page 152

known as financing costs; this is compared to the net revenue stream i.e. the
amount funded from Council Tax, NDR and government grants. 
(viii) Indicator 2(a) highlights the proportion of external interest payable by the Council
which is fixed and variable over the term of the borrowing, and therefore the
exposure to the effects of interest rate changes. As at 31 December 2025, the
level of borrowing subject to variability is deemed to be within acceptable levels. 
(ix) Indicator 2(b) highlights a projected decrease in loan charges of £2.3m compared
to the initial Treasury Management Strategy estimates for 2025/26. This
projection takes into account treasury management activity, internal Interest on
Revenue Balances (IORB) recharges due to increased market interest rates, the
loans fund holiday flexibility adopted in 2022/23 and decisions of the Policy and
Strategy Committee and the Strategic Capital Delivery Group to approve and
reprofile the current capital programme for the period 2024/25 to 2028/29 based
on current programme delivery plans. This current loan charge variance is made
up of: 
• A net treasury management interest and expenses underspend of £2.1m is
projected (General Fund £0.6m decreased spend, HRA £1.5m decreased
spend), which is a primarily a reflection of increased internal IORB charges,
and incorporates cashflow management techniques adopted, e.g. directing
the timing of new borrowing, managing investment security, liquidity and
interest rate risk. 
• In 2025/26 it is anticipated there will be a minor decrease in anticipated loans
fund advance repayments of £0.2m (£0.1m General Fund, HRA £0.1m). This
is primarily due to lower capital borrowing incurred in 2024/25 and revised
average loan pool rates from previously forecast. 
(x) Indicator 2(c) relates to the level of fixed debt due to mature within time periods. 
The level of debt maturing remains within the upper limits set for each category
at the beginning of the financial year. 
(xi) The Liability Benchmark at Appendix 3.  The Treasury Management Code states
that organisations should evaluate the amount, timing and maturities needed for
new borrowing in relation to planned borrowing needs, in order to avoid borrowing
too much, too little, too long or too short. The liability benchmark is an important
tool to help establish whether the Council is likely to be a long-term borrower or
long-term investor in the future and so shapes its strategic focus and decision
making. Essentially this benchmark identifies the projection of external
debt/borrowing required over the long term to fund approved revenue & capital
budgets, while keeping treasury investments at the minimum level required to
manage day-to-day cash. 
(xii) This represents the comparison of the Council’s actual borrowing against an
alternative strategy. This utilises the forecasts for Capital Financing Requirement,
long-term liabilities, current external borrowing, balance sheet resources i.e.
reserves, and that cash and investment balances are kept to a minimum of
£30.0m at each year-end to maintain sufficient liquidity but minimise credit risk. 
Page 152 of 248

Page 153

(xiii) The Loans CFR (solid light blue) represents the total cost of the capital
expenditure plans based on the estimated current profile of the 5-year Capital
Programme 2024-2025 to 2028-2029 as approved by Policy & Strategy
Committee on 13th March 2025.  This reduces over time as scheduled principal
repayments are made to the loans fund. The Net Loans Requirement (dotted red
line) represents the minimum external borrowing required to fund the current
capital expenditure plans assuming all cash reserves and balances are utilised
to offset borrowing requirements.  The Liability Benchmark (solid red line)
represents the estimated borrowing required, taken account of liquidity allowance
required of £30.0m to be held to maintain liquidity and to manage day-to-day
cashflows. 
(xiv) The solid grey section shows the maturity profile of current borrowing.  The gap
between the grey section and the liability benchmark line represents the
estimated additional borrowing that is forecast will be required to fund the current
capital expenditure plans, via long-term and short-term borrowing options. 
3. Measures of success 
3.1  Overall the approach adopted by the Council’s Treasury Management team during the
quarter under review met the key requirements of the 2025/26 Treasury Management
Strategy. Prudential indicators have remained in accordance with those approved by
Committee on 26 February 2025. The projected final outturn illustrates a healthy
prudential margin and borrowing levels that are below sustainable limits, ensuring that
the projected capital investment levels remain affordable and sustainable. However,
the current financial volatility and increased borrowing costs has resulted in an
assessment being undertaken of the potential impact on future years of the current
capital programme.  This will continue to be monitored to determine if any further review
of the programme is required to ensure that it remains sustainably affordable. 
4. Supporting documentation 
4.1 Appendix 1 Loans, Long term Liabilities & Investments as at 31 December 2025.
4.2 Appendix 2 Summary of Treasury and Prudential Indicators as at quarter ended 31   
December 2025.
4.3 Appendix 3 Liability Benchmark as at quarter ended 31 December 2025. 
Greg Telfer
Chief Officer (Finance and Technology) 
31/3/25
Actual
£m
31/3/26
Forecast
£m
31/3/27
Forecast
£m
31/3/28
Forecast
£m
31/3/29
Forecast
£m
31/3/30
Forecast
£m
Loans CFR 1,263.2 1,404.0 1,622.4 1,809.1 2,107.0 2,293.1
less Balance Sheet Resources (357.1) (361.0) (344.7) (308.8) (290.5) (303.7)
Net Loans Requirement 906.1 1,043.0 1,277.7 1,500.3 1,816.6 1,989.4
plus: Liquidity Allowance 30.0 30.0 30.0 30.0 30.0 30.0
Liability Benchmark 936.1 1,073.0 1,307.7 1,530.3 1,846.6 2,019.4
Existing Borrowing 987.6 986.9 713.6 640.7 571.9 503.6
New Borrowing Required 0.0 86.1 594.1 889.6 1,274.7 1,515.8
Page 153 of 248

Page 154

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Financial impacts are outlined within the report.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 154 of 248

Page 155

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
As the Council borrows and invests significant sums of money it is exposed to
financial risks including the loss of invested funds and the revenue effect of
changing interest rates. Therefore, successful identification, monitoring and control
of risk remains central to the Council’s treasury management strategy. 
Treasury Management activity by its very nature has a number of inherent risks
including interest rate, liquidity and refinancing risks. To minimise risk for its
treasury management activities the Council adopts and operates in accordance
with the guidelines for best practice prescribed within the CIPFA “Treasury
Management in the Public Services” Code of Practice and the CIPFA Prudential
Code for Capital Finance in Local Authorities. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 155 of 248

Page 156

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 156 of 248

Page 157

LOANS, LONG TERM LIABILITIES & INVESTMENTS AS AT 31 DECEMBER 2025                                                                       Appendix 1
DEBT RESTRUCTURING   
BALANCE        
1-October-25
EARLY
REDEMPTION REFINANCING
NEW
BORROWING /
LONG-TERM
LIABILITIES
PRINCIPAL
REPAYMENTS
NET CASH
MOVEMENTS
BALANCE
31-December-25
(1) (2) (3) (4) (5) (6) (7)
LONG-TERM LOANS
PWLB 699,723,019 0 0 85,000,000 (21,940,915) 63,059,085 762,782,104
MONEY MARKET LOANS 54,000,000 0 0 0 0 0 54,000,000.00
LOBO 3,000,000 0 0 0 (2,000,000) (2,000,000) 1,000,000.00
ENERGY EFFICIENCY LOAN 383,513 0 0 0 (98,006) (98,006) 285,506
757,106,532 0 0 85,000,000 (24,038,921) 60,961,079 818,067,611
SHORT-TERM LOANS
TEMPORARY 216,500,000 0 0 72,500,000 (60,000,000) 12,500,000 229,000,000
INTERNAL LOANS 6,280 0 0 0 0 0 6,280
216,506,280 0 0 72,500,000 (60,000,000) 12,500,000 229,006,280
LONG -TERM LIABILITIES
FINANCE LEASE OBLIGATIONS 805,990 0 0 0 0 0 805,990
IFRS16 RIGHT-OF-USE LIABILITY 3,639,729 0 0 0 0 0 3,639,729
LONG TERM LIABILITY 285,606,436 0 0 0 (3,297,084) (3,297,084) 282,309,352
290,052,155 0 0 0 (3,297,084) (3,297,084) 286,755,071
TOTAL EXTERNAL DEBT 1,263,664,967 0 0 157,500,000 (87,336,005) 70,163,995 1,333,828,962
INVESTMENTS
THIRD PARTY ADVANCES 1,123,026 0 0 0 (12,808) (12,808) 1,110,218
BANKS & OTHER FINANCIAL INSTITUTIONS 70,880,382 0 0 0 0 41,399,016 112,279,398
UNCLEARED BALANCES INCL CASH IN TRANSIT (3,084,407) 0 0 0 0 (5,119,856) (8,204,263)
CASH & CASH EQUIVALENTS 68,919,001 0 0 0 (12,808) 36,266,352 105,185,353
NET BORROWING 1,194,745,966 0 0 157,500,000 87,323,197 33,897,643 1,228,643,609
Page 157 of 248

Page 158

Appendix 2  
Summary of Treasury and Prudential Indicators as at quarter ended 31 December 2025
1. Prudential Indicators
(a) Capital Expenditure Initial
Estimate
2025/2026
(£m)
Projected 
Outturn 
2025/2026 
(£m)
Variance
2025/2026
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
Forecast 
2029/2030 
(£m)
Capital Expenditure: General Services 153.4 156.2 2.8 185.4 134.0 258.0 104.6
Capital Expenditure: HRA 125.8 140.8 15.0 156.8 175.0 165.3 182.2
Total spend : Capital Expenditure 279.2 297.0 17.8 342.2 309.0 423.3 286.8
Total spend : Credit Arrangement 14.4 14.0 (0.4) 15.9 16.2 15.5 15.5
Total Capital Investment 293.6 311.0 17.4 358.1 325.2 438.8 302.3
Financed By:     
Capital Grants & Other External Contributions 59.5 97.5 38.0 63.4 63.5 62.6 36.1
Capital from Current Revenue 46.8 30.7 (16.1) 27.9 23.2 23.2 23.2
Capital receipts 3.4 1.7 (1.7) 3.4 3.4 3.4 0.0
Capital receipts transfer to Capital Fund 0.0 0.0 0.0 0.0 0.0 0.0 0.0
CFR : Borrowing - General Services 84.1 76.5 (7.6) 143.4 93.1 215.2 91.7
CFR : Borrowing - HRA 85.4 90.6 5.2 104.1 125.8 118.9 135.8
Credit Arrangements 14.4 14.0 (0.4) 15.9 16.2 15.5 15.5
check 0.0 0.0 0.0 0.0 0.0 0.0 0.0
(b) Capital Financing Requirement (CFR) Initial
Estimate
2025/2026
(£m)
Projected 
Outturn 
2025/2026 
(£m)
Variance
2025/2026
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
Forecast 
2029/2030 
(£m)
General Services 1,080.8 1,061.4 (19.4) 1,190.7 1,268.1 1,463.7 1,533.3
HRA 640.6 638.0 (2.6) 726.2 834.9 934.5 1,048.9
Total CFR 1,721.4 1,699.4 (22.0) 1,916.9 2,103.0 2,398.2 2,582.2
Movement in CFR 143.8 139.3 217.5 186.1 295.2 184.0
(c) Gross Debt and the Capital Financing Requirement Initial
Estimate
2025/2026
(£m)
Projected 
Outturn 
2025/2026 
(£m)
Variance
2025/2026
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
Forecast 
2029/2030 
(£m)
Gross Borrowing : Loan Debt 1,186.8 1,148.4 (38.4) 1,383.1 1,605.7 1,921.9 2,102.2
Long-term Liabilites 294.0 295.4 1.4 294.5 294.0 291.2 289.2
Gross Debt 1,480.8 1,443.8 (37.0) 1,677.6 1,899.7 2,213.1 2,391.4
Capital Financing Requirement 1,721.4 1,699.4 (22.0) 1,916.9 2,103.0 2,398.2 2,582.2
Prudential Margin 240.6 255.6 15.0 239.3 203.3 185.1 190.8
Page 158 of 248

Page 159

Appendix 2 (cont) 
Summary of Treasury and Prudential Indicators as at quarter ended 31 December 2025
1. Prudential Indicators
(d) Authorised Limit and Operational Boundary Initial
Authorised
Limit
2025/2026
(£m)
Initial
Operational
Boundary
2025/2026
(£m)
Maximum
Borrowing
Level Q3
2025/2026
(£m)
Borrowing 1,505.0 1,455.0 1,056.4
Other Long-term Liabilities 325.0 325.0 286.8
Total Debt 1,830.0 1,780.0 1,343.2
(e) Proportion of Financing Costs to Net Revenue Stream
Initial
Estimate
2025/2026
(£m)
Projected 
Outturn 
2025/2026 
(£m)
Variance
2025/2026
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
Forecast 
2029/2030 
(£m)
General Fund Loan Charges 46.6 46.0 (0.6) 47.7 57.8 67.5 81.0
General Fund Finance Lease/PPP Costs 15.3 16.9 1.6 15.5 14.8 14.5 14.0
General Fund : Capital Financing Costs 61.9 62.9 1.0 63.2 72.6 82.0 95.0
General Fund : Net Revenue Stream 1,068.8 1,054.1 (14.7) 1,068.8 1,068.8 1,068.8 1,068.8
Proportion of Financing Costs to Net Revenue Stream - GF 5.8% 6.0% 0.2% 5.9% 6.8% 7.7% 8.9%
Proportion of Financing Costs to Net Revenue Stream
Initial
Estimate
2025/2026
(£m)
Projected 
Outturn 
2025/2026 
(£m)
Variance
2025/2026
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
Forecast 
2029/2030 
(£m)
HRA Loan Charges 43.3 41.8 (1.5) 46.8 53.1 63.4 70.8
HRA Finance Lease/PPP Costs 0.3 0.4 0.1 0.4 0.3 0.3 0.0
HRA : Capital Financing Costs 43.6 42.2 (1.4) 47.2 53.4 63.7 70.8
HRA : Net Revenue Stream 171.9 171.9 0.0 175.3 188.6 201.6 209.2
Proportion of Financing Costs to Net Revenue Stream - HRA 25.4% 24.5% (0.8%) 26.9% 28.3% 31.6% 33.8%
Page 159 of 248

Page 160

Appendix 2 (cont) 
Summary of Treasury and Prudential Indicators as at quarter ended 31 December 2025
2. Treasury Management Indicators
a) Interest Rate Exposures on External Interest Payments Position as at
31/12/2025
(£m) %
External Interest Payable on Fixed Rate Loan Debt 43.8 99.4%
External Interest Payable on Variable Rate Loan Debt 0.3 0.6%
b) Loans Fund Revenue Account Initial
Estimate
2025/2026
(£m)
Projected 
Outturn 
2025/2026 
(£m)
Variance
2025/2026
(£m) %age
Loans Fund Interest Payments 64.6 63.9 0.7 1.1%
Loans Fund Expenses 0.4 0.4 0.0 0.0%
Total Loans Interest Payments & Expenses 65.0 64.3 0.7 1.1%
Loans Funds Investment Income (1.5) (2.9) 1.4 (93.3%)
Total Loans Fund Interest Payments Investment Income & Expenses 63.5 61.4 2.1 3.3%
Allocated as follows :
Loans Fund Interest Payments Investment Income & Expenses:General Fund 34.4 33.8 0.6 1.7%
Loans Fund Interest Payments Investment Income & Expenses:HRA 29.1 27.6 1.5 5.2%
Capital Advances Repayments -  General Fund 12.2 12.1 0.1 0.8%
Capital Advances Repayments -  HRA 14.2 14.1 0.1 0.7%
Total Capital Advances 26.4 26.2 0.2 0.8%
Total Loan Charges 89.9 87.6 2.3 2.6%
c) Maturity Structure of Borrowing
<12months
12 months to
2 years 2 to 5 years 5 to 10 years
10 to 20
years
20 to 40
years >40 years
Upper Limit maturing :Fixed & Variable Rate Debt 15.0% 15.0% 25.0% 30.0% 35.0% 45.0% 30.0%
Lower Limit maturing :Fixed & Variable Rate Debt 0.0% 0.0% 5.0% 5.0% 5.0% 10.0% 10.0%
Maturity structure at the start of Q3 11.5% 7.4% 20.1% 27.2% 9.8% 20.6% 3.4%
Maturity structure at the end of  Q3 11.0% 8.9% 24.9% 24.2% 8.9% 19.0% 3.2%   
Page 160 of 248

Page 161

Appendix 3 
0
500
1,000
1,500
2,000
2,500
2025 2027 2029 2031 2033 2035 2037 2039 2041 2043 2045 2047 2049 2051 2053 2055
£m
Liability Benchmark - North Lanarkshire
Fixed rate loans LOBO loans Loans CFR Liability benchmark Net loans requirement
Page 161 of 248

Page 162

Page 162 of 248

Page 163

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    GT/KS/RM Date 04/03/26 
Treasury Management Strategy 2026/2027
Treasury Management and Prudential Indicators 2026/2027 to
2030/2031 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 
Executive Summary
This report fulfils the key requirements of the Local Government Act 2003 to: 
• Outline the Treasury Management Strategy for 2026/2027 in accordance with the
CIPFA Code of Practice on Treasury Management. 
• Report on the treasury and prudential indicators as required by the above code and
the CIPFA Prudential Code for Capital Finance in Local Authorities. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Approves the Treasury Management Strategy 2026/2027 and adopts the Treasury
Management and Prudential Indicators for 2026/2027 to 2030/2031, set out within
Appendix 1 to this report. 
(2) Remits the Treasury Management Strategy 2026/2027 to the Council for approval. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 15
Page 163 of 248

Page 164

1. Background 
1.1 Each year, in line with the Code of Practice, the Council approves a Treasury
Management Strategy. This report updates the strategy for year 2026/2027. 
1.2 In addition, the Treasury Management Strategy outlines the Prudential and Treasury
Indicators, which are monitored on a regular basis to demonstrate that the Council’s
investment plans are managed within a sound financial environment.    
1.3 This strategy continues to emphasise, under the revised Code of Practice, an enhanced
role for members in terms of accountability and awareness. The Finance & Resources
Committee is responsible for the development of the strategy, its implementation and
monitoring, while the Audit and Scrutiny Panel have a specified role in the effective
scrutiny, as part of its work on reviewing the internal financial controls of the Council. 
1.4 The report also reflects The Local Government Investments (Scotland) Regulations
2010 which were enacted from 1 April 2010 containing a requirement for the annual
investment strategy and annual investment report to be approved by the full Council
and not delegated to a committee or sub-committee. As a result, this strategy, if
endorsed by committee, should be remitted to the Council for approval. 
2. Report 
2.1 The strategy fully detailed within Appendix 1 covers the: 
• debt and investment projections 
• outlook in interest rates
• borrowing and investment strategies
• treasury management performance measures
• policy on repayment of loans funds advances
• treasury management/prudential indicators. 
2.2  The requirements of the Local Government Investments (Scotland) Regulations 2010
have been incorporated within the 2026/2027 Strategy. 
2.3 The introduction of the Prudential Code for Capital Finance in Local Authorities in April
2004 brought about a change to capital spending controls, giving councils the freedom
to invest in capital projects without the limitation of legislative controls, provided their
programmes can be shown to be prudent, affordable, and sustainable. 
2.4 This report builds on this framework outlining the Council’s prudential and treasury
management indicators for 2026/2027 to 2030/2031. The key mandatory indicators
required by both the Treasury Management Code and the Prudential Code are
illustrated for these years and, along with local indicators, with a view to more fully
informing the decision-making process.   
2.5  Members should note that the forecasts contained within this report are indicative, as
per the 5-year Strategic Capital Investment Programme 2024/25 to 2028/29 approved
by the Policy and Strategy Committee on 13 March 2025 and reviewed on a continual
basis by the Strategic Capital Delivery Group (SCDG) including re-profiling adjustments
within the 5-year programme. It should be noted therefore that the estimates presented
within this report are based on the current forecasts of the progression of the
programme and projected resources available.  The financial implications of
Page 164 of 248

Page 165

implementing this plan will be accounted for in the Council’s Medium Term Financial
Planning assumptions. 
2.6 Material changes to the estimates/forecasts provided within this strategy and prudential
indicators will be reported during the quarterly Treasury Management monitoring
process and future annual updates to the Treasury Management Strategy. 
3. Measures of success 
3.1 The Treasury Management Strategy and the Prudential/Treasury Management
indicators illustrated in Appendix 1, provide members with assurance that the key
objectives of the Prudential Framework (i.e. prudence and affordability) will be satisfied,
and the inherent risks of Treasury Management risks will be controlled effectively and
efficiently, providing value for money.  When taken together, the indicators illustrate
that the proposed capital investment plans for 2026/2027 onwards are prudent and
affordable.  Healthy prudential margins from 2026/2027 onwards justify the investment
levels, the cost or affordability of which is contained within the existing financial
management strategies. 
4. Supporting documentation 
4.1 Appendix 1  Treasury Management Strategy 2026/2027 and the Treasury 
Management and Prudential Indicators for 2026/2027 to 2030/2031.   
Greg Telfer
Chief Officer (Finance and Technology)  
Page 165 of 248

Page 166

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
All financial impacts are contained withing the body of the report 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 166 of 248

Page 167

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Treasury Management activity by its very nature has a number of inherent risks
including interest rate, liquidity and refinancing risks. To minimise risk for its
treasury management activities the Council adopts and operates in accordance
with the guidelines for best practice prescribed within the CIPFA “Treasury
Management in the Public Services” Code of Practice and the CIPFA Prudential
Code for Capital Finance in Local Authorities. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 167 of 248

Page 168

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 168 of 248

Page 169

Appendix 1   
Treasury Management Strategy
2026/2027
& 
Treasury Management Indicators
& Prudential Indicators 
2026/2027 to 2030/2031
Page 169 of 248

Page 170

Appendix 1 
Index 
1.  Introduction 
2. Annual Borrowing Requirement 2026/2027 
3. Outlook for Interest Rates 
4. Annual Borrowing Strategy 2026/2027 
5. Annual Investment Strategy 2026/2027 
6. Performance Measurement Indicators and Benchmarking 
7. Treasury Management Indicators 2026/2027 to 2030/2031 
8. Prudential Indicators 2026/2027 to 2030/2031 
9. Policy on Repayment of Loans Fund Advances 2026/2027
Annex A: Treasury Management Policy Statement and  
Clauses adopted   
Annex B: Explanation of Long-term Rating Definitions 
Annex C: Permitted Investments, Associated Controls Credit
Rating, Money and Time Limits
Annex D: Interest Rate Forecast March 2026 until December
2028
Annex E: Sensitivity Analysis of Prudential Indicators:   
Affordability 2026/2027 to 2030/2031 
Annex F: Loans Fund Repayment Schedule 
Page 170 of 248

Page 171

Appendix 1 
Treasury Management Strategy 2026/2027, Treasury Management Indicators and  
Prudential Indicators 2026/2027 to 2030/2031 
1. Introduction
1.1 Treasury Management (TM) deals with the borrowing and investment activity of the Council and
is an integral part of the financial management strategy of the Council. It seeks to ensure that
both capital borrowing requirements and day-to-day revenue cash transactions are fully funded.
Its importance has increased as a result of the additional freedoms provided by the Prudential
Code, with specific treasury management and prudential indicators included in this Strategy that
require approval.
1.2 The treasury management and prudential indicators outlined within section 7 and 8 below
consider the affordability and impact of capital expenditure decisions, whilst the treasury
management service considers the effective funding of these decisions. Together these form part
of a process to ensure the Council meets its balanced budget requirement.
1.3 The Council’s treasury management activities are strictly regulated by statutory requirements and
a professional code of practice. In accordance with the Council’s financial regulations the Council
adopts the CIPFA “Treasury Management in the Public Services” Code of Practice (the Code)
issued in December 2021 including the Treasury Management Policy statement, and the adoption
of the key clauses outlined within Annex A. The Council also complies with the CIPFA Prudential
Code with the setting of at least three-year prudential indicators.
1.4 The Council has a Capital Strategy which is approved and reviewed annually by the Policy and
Strategy Committee, in conjunction with the Strategic Capital Investment Programme to
demonstrate that the Council takes capital expenditure and investment decisions in line with the
Councils service objectives and properly takes account of stewardship, value for money,
prudence, affordability and sustainability.
1.5 The Prudential Code requires the Council’s Capital Strategy to be aligned to the Treasury
Management Strategy. To ensure this integrated approach between the capital expenditure plans
and Treasury Management Strategy, the Council will continue to incorporate the Prudential
Indicators with regard to capital expenditure within this document. 
1.6 The Treasury Management Strategy outlines the Council’s debt position, including the anticipated
level of debt and the authorised borrowing limit. The capital expenditure plans determine the
borrowing need of the Council. The Treasury Management team essentially monitor the long-term
cash flow planning, to ensure the Council can meet its capital spending obligations.
1.7 The Code re-affirms the Audit and Scrutiny Panel’s role in providing effective scrutiny of the
Treasury Management Strategy and policies, whilst the Finance and Resources Committee
remains responsible for the development of the strategy, its implementation and monitoring.
1.8 The revised Prudential and Treasury Codes emphasises members responsibility in this area,
requiring increased member awareness, to enable greater member scrutiny of treasury
management activity. This also enables local authorities to demonstrate that members have the
necessary skills and knowledge in this complex and technical area, to make informed decisions.
The Treasury Management team provide in-house awareness sessions, with members also
provided with the opportunity to review the Councils Treasury Management Practices manual. A
Treasury Management Toolkit has been developed by CIPFA Scotland Treasury Management
Forum and CIPFA, which provides an online training resource to elected members and financial
staff, to further develop knowledge and understanding of elements of treasury management.
1.9 In accordance with the CIPFA Treasury Management Code recommendations, the Council has a
Treasury Management advisory contract in place. The current providers are Arlingclose Ltd, who
provide specific advice on investment, debt and capital finance issues.
1.10 Per the CIPFA Treasury Management Code, the Council adopts a high-level approach to setting
policies for borrowing and investment activity. An appropriate scheme of delegation is in place to
ensure all staff employed in treasury management have the suitable skills and resources, to carry
out delegated treasury management activities effectively, efficiently and achieving value for
money.
1.11 The treasury management staff regularly attend training courses, seminars and workshops
provided by the Council’s advisors, the CIPFA Scotland Treasury Management Forum and other
ad hoc providers, including brokers and financial institutions. Staff also receive regular treasury 
Page 171 of 248

Page 172

Appendix 1 
Treasury Management Strategy 2026/2027, Treasury Management Indicators and  
Prudential Indicators 2026/2027 to 2030/2031 
related updates, information, and newsletters on a daily/weekly basis via email from banks and
other financial institutions. Staff also have access to treasury related websites to maintain
awareness of treasury management issues.
1.12 The requirements of the Code have been incorporated within the 2026/2027 Treasury
Management Strategy and in the preparation of the Treasury Management Indicators & Prudential
Indicators for 2026/2027 to 2030/2031.
1.13 The Code of Practice requires the Council to produce reports on its Treasury Management
policies, practices, and activities on a regular and ongoing basis. This encompasses the
preparation and approval of an Annual Strategic Plan, which defines the arrangements for
managing the Treasury Management function in the incoming year. This report details the
proposed Strategy for 2026/2027.
1.14 This Strategy covers:
♦ The debt and investment projections 
♦ Outlook in interest rates
♦ The borrowing and investment strategies
♦ Treasury Management performance indicators
♦ Specific limits on treasury management activities
1.15 The requirements of the Local Government Investments (Scotland) Regulations 2010 have been
incorporated within the 2026/2027 Strategy, including the preparation of an investment strategy
which must be approved by the full Council.
1.16 Members should note that the forecasts contained within this report are indicative, as per the 5-
year Strategic Capital Investment Programme 2024/25 to 2028/29 approved by the Policy and
Strategy Committee on 13 March 2025 and reviewed on a continual basis by the Strategic Capital
Delivery Group (SCDG) including re-profiling adjustments within the 5-year programme. It should
be noted therefore that the estimates presented within this report are based on the current
forecasts of the progression of the programme and projected resources available. Material
changes to the estimates/forecasts provided within this Treasury Management strategy and
Prudential indicators will be reported during the quarterly Treasury Management Monitoring
Process. 
2. Annual Borrowing Requirement 2026/2027
2.1 At the beginning of 2026/2027, it is anticipated that the Council’s total debt outstanding including
long term liabilities will amount to £1,395.8m. The Strategic Capital Investment Programme for
the period 2024/2025 to 2028/2029 will be reviewed on a continual basis by the Strategic Capital
Delivery Group (SCDG), including any re-profiling adjustments required. On this basis, it is
currently anticipated that during 2026/2027 there will be a total capital expenditure (excluding
credit arrangements) of £329.3m which comprises the General Fund Community Investment
programme of £155.2m and the Housing Revenue Account programme of £174.1m. 
2.2 The forecast capital expenditure will be resourced by capital grants, external contributions and
capital funded from current revenue (CFCR) of £93.0m, with £236.3m representing capital
investment funded by borrowing. This represents an in year borrowing need, which will contribute
towards the net increase in the Capital Financing Requirement (CFR). Table 7 within Section 8
below sets out the forecast Capital Expenditure plans for the period 2026/2027 to 2030/2031. 
2.3  During 2025/2026 the Council has primarily used a combination of internal cash balances /
reserves, short term borrowing (<1 yr) and credits due to the scheduled principal repayments to
the loans fund from service departments (annuity based) to meet its borrowing requirement and
refinancing of long-term debt maturing in lieu of long-term borrowing where possible however
long-term borrowing is undertaken when deemed appropriate. This strategy is adopted in light of
interest rate expectations, management of carrying costs, and the availability of short-term
borrowing up to 364 days at attractive rates. Whilst it will be kept under continual review, a similar
borrowing strategy is anticipated during 2026/2027 with other funding sources utilised in lieu of
future long-term borrowing, where possible, and in line with the borrowing strategy outlined below.
2.4 To meet the capital programme financing requirement, the replacement of maturing long-term
debt and the maintenance of cash balances necessary to meet on going daily liquidity 
Page 172 of 248

Page 173

Appendix 1 
Treasury Management Strategy 2026/2027, Treasury Management Indicators and  
Prudential Indicators 2026/2027 to 2030/2031 
requirements, it is estimated that the Council will require to source long-term borrowing of
£306.0m in 2026/2027, £312.0m in 2027/2028, £439.0m in 2028/29, £196.0m in 2029/30 and
£175.5m in 2030/31.
2.5 These borrowing projections exclude temporary borrowing undertaken, with average levels held
expected to be approximately £242.0m over the forecast period. This level of short-term borrowing
can be attractive, due to generally lower rates.  It should be noted that short-term interest rates
have fallen over the past year, and are expected to fall a little further, therefore it is likely to be
more cost effective over the medium-term to borrow short-term loans where possible instead.
2.6 The Council’s borrowing requirement is set firmly within the framework of wider Council activity
and will be driven by ‘The Plan for North Lanarkshire’, the Capital Strategy and the Medium-Term
Financial Plan. 
3. Interest Rates Outlook and Other Economic Updates
3.1 The most significant impacts on the Council’s treasury management strategy for 2026/27 are
expected to include: the influence of the UK government’s 2025 Autumn Budget, lower short-term
interest rates alongside higher medium and longer-term rates, slower economic growth, together
with ongoing uncertainties around the global economy, stock market sentiment, and geopolitical
issues.
3.2 The Bank of England (BoE)’s Monetary Policy Committee (MPC) cut Bank Rate to 3.75% in
December 2025, as expected. The vote to cut was 5-4, with the minority instead favouring holding
rates at 4.0%. Those members wanting a cut judged that disinflation was established, while those
preferring to hold the Bank Rate argued that inflation risks remained sufficiently material to leave
rates untouched at this stage.
3.3 Figures from the Office for National Statistics show that the UK economy expanded by 0.1% in
the third quarter of the calendar year, this was unrevised from the initial estimate. The most recent
Monetary Policy Report in November 2025 projected modest economic growth, with GDP
expected to rise by 0.2% in the final calendar quarter of 2025. Annual growth is forecast to ease
from 1.4% before improving again later, reflecting the delayed effects of lower interest rates,
looser monetary conditions, stronger global activity, and higher consumer spending. The view of
modest economic growth going forward was echoed by the Office for Budget Responsibility in its
Economic and fiscal outlook published in line with the Autumn Statement, which revised down its
estimate of annual real GDP to around 1.5% on average between 2025 and 2030. 
3.4 CPI inflation was 3.2% in November 2025, down from 3.6% in the previous month and below the
3.5% expected. CPI inflation rose to 3.4% in December, slightly above the 3.3% expected. Core
CPI eased to 3.2% from 3.4% in November, contrary to forecasts to remain at 3.6% and thereafter
remaining steady at 3.2% in December. Looking forward, the MPC continues to expect inflation
to fall, to around 3% in calendar Q1 2026, before steadily returning to the 2% target by late 2026
or early 2027.
3.5 The labour market continues to ease with rising unemployment, falling vacancies and flat
inactivity. In the three months to November 2025, the unemployment rate increased to 5.1%,
higher than the level previously expected by the BoE, while the employment rate slipped to 75.1%.
Pay growth for the same period eased modestly, with total earnings (including bonuses) growth
at 4.7% and while regular pay was 4.5%.
3.6 In global terms the US Federal Reserve also continued to cut rates, including reducing the target
range for the Federal Funds Rate by 0.25% at its December 2025 meeting, to 3.50%-3.75%, in
line with expectations. The minutes of the meeting noted that most Fed policymakers judged that
further rate cuts would be likely in 2026 if inflation continues to ease, however they were still
divided in their assessment of the risks between inflation and unemployment. The European
Central Bank (ECB) kept its key interest rates unchanged in December for a fourth consecutive
meeting, maintaining the deposit rate at 2.0% and the main refinancing rate at 2.15%. The ECB
maintained that future policy decisions will remain data-dependent, that inflation is close to its 2%
target and that the euro area economy continues to expand despite a challenging global
environment, including heightened geopolitical risks and trade tensions.
3.7 Arlingclose, the Council’s treasury management advisers, currently forecasts that the Bank of 
Page 173 of 248

Page 174

Appendix 1 
Treasury Management Strategy 2026/2027, Treasury Management Indicators and  
Prudential Indicators 2026/2027 to 2030/2031 
England’s Monetary Policy Committee will continue to reduce Bank Rate in 2026, reaching around
3.25%. This forecast reflects amendments made following the Autumn Budget and an
assessment of the fiscal measures and their market implications and following the BoE MPC
meeting held on 18th December.
3.8 Long-term gilt yields, and therefore interest rates payable on long-term borrowing, are expected
to remain broadly stable on average, though with continued volatility, and to end the forecast
period marginally lower than current levels. Yields are likely to stay higher than in the pre-
quantitative tightening era, reflecting ongoing balance sheet reduction and elevated bond
issuance. Short-term fluctuations are expected to persist in response to economic data releases
and geopolitical developments.
3.9 Movements in supply and demand for UK gilts heavily influence the gilt prices and yields, with
corresponding movements up or down in the PWLB interest rates reflecting the perception of
improved stability or increased uncertainty in both the UK and other non-UK financial markets
respectively.
3.10 Annex D provides details of the forecast official Bank rate, 3-month money market rate and PWLB
rates over the next five years which are underpinned by the economic risks and uncertainties
outlined in the preceding paragraphs above. 
3.11 The Council’s main source of borrowing is the HM Treasury’s PWLB lending facility (PWLB), with
PWLB lending generally available at 100bps (1.00%) above UK gilt prices with any forecast
movements in PWLB interest rates closely correlated to gilt movements. 
3.12 Table 1 below includes forecast average PWLB rates anticipated for a range of maturity periods
over the next 5 years based on the forecast per Annex D. The interest rates shown take account
of the 0.20% reduction in the standard rates which will apply if the Council, as expected, meets
the qualifying criteria for the certainty rate in 2026/2027 and future years. Please note as per para
4.22 that there may be an additional discount available on PWLB rates of 0.4% for qualifying HRA
borrowing that relates to the period to post-March 2026 if formally announced. 
3.13 These projections underpin the borrowing and investment strategies outlined in the following
paragraphs.
4.0 Annual Borrowing Strategy 2026/2027 
4.1 The Council uses a combination of internally accumulated cash funds i.e. its revenue
reserves/balances plus working capital, temporary borrowing (up to 364 days) and external
borrowing from both the markets and PWLB, to fund its capital financing requirement (CFR). This
minimises the amount of investment balances held, managing credit and counterparty risk and
the impact of low investment returns, resulting in the Council currently being in an under borrowed
position, which is in line with the strategic approach adopted.
4.2 The borrowing strategy to meet the current year (2025/2026) capital programme financing
requirement of £157.2m (excluding credit arrangements), has been to use a combination of
internal cash balances, and short-term borrowing where available at attractive rates plus credits
due to the scheduled principal repayments, in lieu of future long-term borrowing where possible,
however long-term borrowing has been taken when deemed appropriate. This strategy is
supported by efficient cashflow management, interest rate outlook, forecast balance sheet 
Annual
Average
Bank
Rate
3 months
Money
Market Rate
5 Year 10 Year 20 Year 50 Year
2026 3.31% 3.36% 4.59% 5.14% 5.74% 5.38%
2027 3.25% 3.30% 4.55% 5.10% 5.70% 5.40%
2028 3.25% 3.34% 4.59% 5.14% 5.74% 5.44%
2029 3.25% 3.34% 4.59% 5.14% 5.74% 5.44%
2030 3.25% 3.34% 4.59% 5.14% 5.74% 5.44%
Table 1 - Medium Term Interest Rate Estimates (averages)
PWLB Rates
Page 174 of 248

Page 175

Appendix 1 
Treasury Management Strategy 2026/2027, Treasury Management Indicators and  
Prudential Indicators 2026/2027 to 2030/2031 
analysis of reserves and provisions, and effective treasury risk management. It is proposed that
a similar borrowing strategy be adopted where possible to meet the financing requirement of
£236.3m in 2026/2027.
4.3 The successor to IAS17 Leases, IFRS16 Leases was  implemented in 2024/2025 financial year,
primarily impacting upon the accounting treatment for operational property and vehicles, plant
and equipment (VPE), acquired under operating lease arrangements, as well as impacting on
PPP contract liabilities, with an increase in the Council’s 2024/2025 Capital Financing
Requirement of £93.6m (PPP £88.2m, Property £2.9m & VPE £2.5m).
4.4 For 2026/2027, it is anticipated that the Capital Financing Requirement will increase by £206.3m,
which comprises the capital investment funded by borrowing and movement in balances held
under credit arrangements due to ongoing impact of IFRS16 Leases, offset by scheduled principal
repayments of loan fund advances and finance leases.
4.5 It is estimated that the Council will require to source long-term borrowing of £306.0m in
2026/2027, £312.0m in 2027/2028, £439.0m in 2028/29, £196.0m in 2029/30 and £175.5m in
2030/31 to meet the on-going capital financing requirements, the replacement of maturing long-
term debt and the maintenance of cash balances necessary to meet on going daily liquidity
requirements. 
4.6 The Council may also borrow additional sums to pre-fund future years’ requirements, providing
this does not exceed the Authorised Limit for borrowing as per section 8.5 and per the principles
in section 5.6.
4.7 These borrowing projections exclude monies borrowed and repayable over a shorter period, with
average levels held expected to be approximately £242.0m over the five-year period. This level
of short-term borrowing is generally attractive due to lower rates typically available.
4.8 The Council’s capital expenditure planning processes and investment/borrowing analysis enables
it to time it’s borrowing to take advantage of opportunities that may arise to achieve beneficial
borrowing rates, minimising interest rate risk.
4.9 The timing of new borrowing will also take into account the level of cash balances and investments
held so that there may be an option of postponing borrowing and continuing to use these balances
in the short term.
4.10 The Councils borrowing strategy will be underpinned not only by the absolute borrowing rates but
also the relationship between short and long-term interest rates. This difference creating a ‘cost
of carry’ for any new longer-term borrowing where the proceeds of borrowing are temporarily held
as investments because of the difference between what is paid on the borrowing and what is
earned on the investment. 
4.11 The Council will closely monitor movements in long and short-term interest rates to manage its
interest rate risk.
4.12 The repayment terms of new borrowing will take account of the debt maturity profile to ensure
that an acceptable amount matures in any one year, managing the refinancing risk, whilst being
undertaken at the most advantageous rate.
4.13 The forecast debt maturity profile at the 31 March 2026 per the graph below highlights that there
are a number of points in the maturity spectrum at which the Council has little or no debt due for
repayment. In general, the current maturity profile provides the Council with flexibility in
determining the maturity period for new borrowing, whilst ensuring the strategy adopted minimizes
the debt interest costs.
4.14 It should be noted that the debt maturity profile per the graph is based on the maturity date of
LOBO (Lender’s Option Borrower’s Option) loans, whilst noting the Code requires the Council to
classify LOBO type loans as having a potential maturity in the year where options or calls exist.
A LOBO option is called, when the lender exercises its right to amend the interest rate, at which
point the Council can accept the revised terms or reject them and repay the loan.  Page 175 of 248

Page 176

Appendix 1 
Treasury Management Strategy 2026/2027, Treasury Management Indicators and  
Prudential Indicators 2026/2027 to 2030/2031 
4.15 The Council currently has £1.0m exposure to LOBO loans which can be called within 2026/2027,
which represents less than 0.12% of the projected long-term debt held at the 31 March 2026 of
£858.4m. The interest rates on the LOBO loans held is 10.937%. 
4.16 A comparison of the LOBO loan option 2026/2027 call dates to the maturity date is provided within
Table 2 below: 
4.17 Based on the current and the forecast interest rates, the likelihood of these loans being called
has been assessed as minimal. In the event that the call option is exercised, the default position
will be the repayment of the LOBO without penalty, with the associated treasury management
risks (refinancing/interest rate/liquidity) managed in line with the borrowing strategy for other
maturing debt.
4.18 The Council’s Treasury Management advisors provide forecasts of interest rates for different
maturity dates in future years. Using these forecasts, it is projected over the years 2026/2027 to
2030/2031, the PWLB borrowing rates may average between 4.55% and 4.60% (up to 5 years)
and between 5.38% and 5.45% (up to 50 years).
4.19 Uncertainty over future interest rate movements increases the risks associated with treasury
management borrowing activity, therefore it should be noted, that the period over which any new
borrowing is taken will be guided by movements and fluctuations in the interest rate yield curve
and capital financing requirement. 
4.20 No more than 25% of the total debt outstanding shall be taken from any one lender at any one
time, except for borrowing from Public Works Loan Board (or its successor body), unless
expressly approved by the Chief Officer (Finance and Technology) in line with current policy. 
10
20
30
40
50
60
70
80
90
100
M
ILLIONS
FINANCIAL YEAR
Forecast Long Term Debt Maturity Profile 31 March 2026
PWLB MARKET LOANS
Loan Value 2026/2027 Call Dates
Year of
Maturity
Current
Interest Rate
£1,000,000 3 April & 3 October 2026/2027 10.9375%
Table 2 - LOBO Loans Summary
Page 176 of 248

Page 177

Appendix 1 
Treasury Management Strategy 2026/2027, Treasury Management Indicators and  
Prudential Indicators 2026/2027 to 2030/2031 
4.21 The Council must apply annually to be eligible for a certainty rate discount of 20 basis points (bps)
on the standard borrowing rate. The Council was successful in its application to the PWLB in April
2025, meeting the criteria and obtaining eligibility for the certainty rate discount on PWLB loans,
accessible from 1 April 2025. Note within Table 1 above the medium-term interest rate average
forecasts for the PWLB interest rates include the 20bps discount. 
4.22 A new PWLB HRA rate, which is 40bps below the certainty rate, has been available from 15th
June 2023. This rate is available until March 2026, and whilst it is envisaged that this facility may
be extended further by the UK Government, it has not however been formally announced at the
time of this strategy.  This rate is available to support local authorities to borrow for Housing capital
purposes or refinancing existing loans. In conjunction with our treasury advisors, we will continue
to review the requirements and assess the borrowing opportunities for the Council.
4.23 The Council will consider a number of borrowing structures in 2026/2027 which will include;  
• Internally accumulated cash funds.
The Council may temporarily use its cash-backed revenue reserves/balances plus working
capital to support its capital programme generally known as internal borrowing, in lieu of future
short and long-term borrowing. This approach may be adopted to manage the level of
investment balances held, managing credit and counterparty risk and the impact of low
investment returns and cost of carry.
• Short-term Borrowing 
The Council may borrow on a temporary basis (up to 364 days) which would significantly
reduce the carrying costs whilst managing the refinancing and interest rate risk. For example,
for loans up to 364 days, other local authorities may generally offer better terms than those of
the PWLB for a 1-year loan, with this option therefore being more attractive. This may also be
used to meet cashflow demands to manage temporary fluctuations in cash balances held on
a daily basis. Short-term interest rates have fallen over the past year, and are expected to fall
a little further, therefore likely to be more cost effective over the medium-term to either use
internal resources, or to borrow short-term loans instead.
• PWLB Variable Rate Loans
These loans are available for periods of up to 10 years with the interest payable generally
linked to movements in short term rates. Liquidity within the short-term borrowing market may
supersede the potential benefits of this type of borrowing. 
• PWLB Fixed Rate Maturity Loans (< 20 years)
New loans for periods up to 20 years, which fit in with the existing debt maturity profile, are
attractive, providing relatively low refinancing risk as as short-term rates are expected to
remain lower than their longer dated counterparts for the foreseeable future. These could offer
greater flexibility to repay/reschedule on beneficial terms in the future, depending on the
volatility of interest rates.
• PWLB Equal Instalment Payment and Annuity Loans (< 30years) 
These loans are different from fixed rate maturity loans as the repayments are made up of both
interest and principal with the principal outstanding reducing at 6 monthly intervals throughout
the life of the loan, with corresponding reduction in interest payments on the balance
outstanding. The interest rates payable are lower than the fixed rate maturity loans for short
and medium dated maturities with an additional benefit being a smoother debt maturity profile
on the debt e.g. £2.5m every year for 10 years as opposed to £25m payable in 10 years. This
also spreads the refinancing risk and may also present beneficial opportunities dependent
upon the interest yield curve at the time repayments are due. 
• Medium/Long Term Fixed PWLB Loans (> 20 years)
These loans will be considered in conjunction with managing the current debt maturity profile,
the higher interest rate profile and the additional cost of carry. These loans currently offer less
flexibility in terms of debt restructuring as a result of PWLB Circular 147, which left the
premature repayment rates unaltered. As a result, these are currently the least attractive
option, but circumstances will be monitored to identify beneficial opportunities to source PWLB
loans within this maturity spectrum.
Page 177 of 248

Page 178

Appendix 1 
Treasury Management Strategy 2026/2027, Treasury Management Indicators and  
Prudential Indicators 2026/2027 to 2030/2031 
• Market Loans
At present availability is limited, but in the future these loans may become more attractive given
the 0.80% margin on PWLB loan rates, as these loans could be cheaper than similar long term
PWLB loans despite this being partially offset by the certainty rate. In addition to the possibility
of advantageous interest rates, there is also the ability to fix the rate for receipt at a date in the
future, avoiding the cost of carry for example to cover future maturities in the period 2026/2027
to 2030/2031. 
• Local Authority Bonds
Local authority bonds can be issued by a public stock exchange listing, a private placement or
a retail bond but would only become a viable option if the size of funds to be borrowed reached
a minimum of £150m. Prior to undertaking a bond issuance, the Council would carry out a due
financial diligence process. Factors to be considered would be the type of bond issue e.g.
index linked, the set-up costs, the timing of the issue, the potential cost of carry, the credit
rating process, the projected long term capital financing requirement position and the nature
of the projects being funded e.g. income streams index linked.
• Leasing 
On occasions, leasing will be used if an option appraisal review identifies this as being
advantageous to the Council and considering IFRS16 Leases impacts.
4.24 As part of its borrowing strategy, the Council will seek to identify and evaluate opportunities for  
debt rescheduling to accrue potential benefits including:
• achievement of cash interest savings, without exposing the Council to additional risk;
• ensuring a more balanced maturity profile and volatility ratio; and 
• achieving the desired borrowing strategy.
4.25 The Council will continue to monitor its debt portfolio and movements in interest rates across
PWLB interest rate structures, to identify opportunities to generate interest savings, whilst
strategically managing any premiums or discounts incurred as a result of the rescheduling/
restructuring.
4.26 The Local Authority (Capital Finance and Accounting) (Scotland) Regulations 2016 legislation
enacted on 1 April 2016 and associated Local Government Circular 7/16 Statutory Guidance on
Loans Fund Accounting provide the legislative background governing the Council's borrowing
activity.
5.0 Annual Investment Strategy 2026/2027
5.1 Investment Regulations
5.1.1 The Investment Regulations became statutory instruments by force of the Scottish Parliament on
the 1 April 2010 in conjunction with the associated Code on the Investment of Money by Local
Authorities. This requires the Council to approve all the types of investments to be used and set
appropriate time and money limits for the amount that can be held in each investment type.  These
types of investments are termed permitted investments and any investments used which have
not been approved as a permitted investment will be considered as ultra vires.
5.1.2 Following a Markets in Financial Instruments (MiFID III) directive, from the 3 January 2018, local
authorities were to be treated as retail clients, with the option to opt up to professional status
provided certain criteria was met. The Council continues to meet the conditions to opt up to
professional status and therefore continues to have access to products including money market
funds, pooled funds, treasury bills, bonds shares and to financial advice.
5.2 Risk Management
5.2.1 In accordance with the revised code, the Council recognises the importance of risk management,
and the effective management of all the associated treasury management risks encountered in
working with the approved permitted list of investments. The treasury management risks and tools
put in place to manage these risks include:
• Credit and counterparty risk: this is the risk of failure by a counterparty to meet its contractual
obligations to the Council, particularly as a result of the counterparty’s diminished 
Page 178 of 248

Page 179

Appendix 1 
Treasury Management Strategy 2026/2027, Treasury Management Indicators and  
Prudential Indicators 2026/2027 to 2030/2031 
creditworthiness and the resulting detrimental effect on the Council’s capital or revenue
resources. There are no counterparties where the risk is zero although AAA rated organisations
have a very high level of creditworthiness. The Council has in place minimum credit criteria to
determine which counterparties and countries are of high creditworthiness to enable
investments to be made safely.
• Liquidity risk: this is the risk that cash will not be available when it is needed. While it could be
said that all counterparties are subject to at least a very small level of liquidity risk, the Council
measures this risk on whether or not, instant access to cash can be obtained from each form of
investment. The Council has developed a detailed cashflow model to record known and forecast
income and payment events arising in the short, medium to long term.
• Interest Rate Risk: This is the risk that fluctuations in the levels of interest rates create an
unexpected or unbudgeted burden on the Council’s finances against which the Council has
failed to protect itself adequately. To manage this risk, the Council takes a view of the future
course of interest rates and formulates a Treasury Management Strategy accordingly, aiming to
maximise investment earnings and minimise borrowing costs, whilst giving full regard to other
treasury management risk factors including security and liquidity.
• Price Risk Management: This risk primarily relates to financial instruments that are regularly
traded in the various financial market exchanges. This is the risk that the Council is required to
redeem this type of investment prematurely at prices above and below the price on which the
financial instrument was originally purchased (par value) and thus be subjected to the market
conditions prevailing at that time. If the investment is held to maturity the principal sum is
guaranteed with it being redeemed at par value. The Council will only use those which appear
on its permitted investment list, if their redemption price is not expected to vary much during its
short life or for example in the case of treasury bills they offer a higher rate of return than
depositing in the Debt Management Account Deposit Facility for a similar level of security.
• Legal and Regulatory Risk: This is the risk that the Council itself or an organisation with which
it is dealing in its treasury management activities fails to act in accordance with its legal powers
or regulatory requirements and the Council suffers losses accordingly. In the event of any doubt
as to the legal and regulatory issues the Council has recourse to its own in-house legal services
team and also the Council’s appointed treasury advisors Arlingclose Ltd. The Council also
currently has in place a highly experienced and qualified Treasury Management team. 
5.3 Permitted Investments
5.3.1 The permitted investments which may be used in the forthcoming year are:
a. Deposits with the Debt Management Account Facility (UK Government);
b. Deposits with other local authorities or public bodies;
c. Instant Access Accounts;
d. Call Accounts;
e. Term Deposits;
f.  Money Market Funds;
g  Instant Access Funds held with Council’s own bank;
h. UK Government Gilts and Treasury Bills;
i.  Supranational Bonds (e.g. World Bank);
j.  Certificates of deposits with financial institutions (banks and building societies);
k. Covered Bonds;
l.  Reverse repurchase agreements and other collateralised arrangements;
m. Investment properties;
n. Loans to third parties, including soft loans;
o. Loans to a local authority company;
p. Shareholdings in a local authority company;
q. Non-local authority shareholdings;
r.  Subordinated debt in projects delivered via ‘Hubco / DBFM’ model  
Page 179 of 248

Page 180

Appendix 1 
Treasury Management Strategy 2026/2027, Treasury Management Indicators and  
Prudential Indicators 2026/2027 to 2030/2031 
5.3.2 In respect of Money Market funds (MMF) listed per f) above, these funds invest in high-quality
short-term fixed income instruments and adhere to very strict credit quality, diversification and
maturity guidelines with preservation of capital constituting the primary objective. Prior to January
2019, the Council used Constant Net Asset Value (CNAV) Funds meaning for every £1 of principal
invested the fund will return £1 of principal on withdrawal by the investor, plus interest with
preservation of capital the prime objective.
5.3.3 However on the 21 January 2019, as a result of MMF Industry reform, the CNAV funds are no
longer available and on this date two types of funds became available to the Council:   
•  a Public Debt CNAV (assets invested in government debt); and
•  a ‘Low Volatility NAV’ (LVNAV) that is a hybrid between CNAV and VNAV 
5.3.4 After scrutiny of the new products available, the Council continues to use money market funds,
primarily using the LVNAV type as an investment instrument. It is worth noting that one of the
main differences between the LVNAV and CNAV fund is the Council is no longer guaranteed
preservation of capital i.e. for every £1 of principal invested the fund will no longer guarantee a
return £1 of principal on withdrawal.
5.3.5 However, the day-to-day operation of LVNAV funds is very similar and has many of the attractive
features of the CNAV fund and the probability of the price changing and loss of capital, within the
boundaries set for price changes i.e. “the collar”, is widely regarded as de minimis. Therefore, the
use of these investments continue to remain within the risk appetite adopted by the Council per
its investment approach. 
5.3.6 Bail-in legislation which ensures that large investors including local authorities will rescue failing
banks instead of taxpayers in the future, is now fully implemented in the UK. Under the UK
Financial Services Compensation Scheme and similar European Schemes most private sector
investors are now partially or fully exempt from contributing to a bail-in. The credit risk associated
with making unsecured bank deposits has therefore increased relative to the risk of other
investment options.  
5.3.7 To manage the bail-in risk, covered bonds, reverse repurchase arrangements and other collateral
arrangements with financial institutions are included within the permitted investment list. These
investments are secured on the assets of the borrower, which limits the potential losses in the
unlikely event of insolvency and would be exempt from bail-in.
5.3.8 Whilst there is no investment specific credit rating for these types of arrangements, the collateral
upon which the investment is secured has a credit rating, with the highest of the collateral credit
rating and the counterparty credit rating being used to determine cash and time limits. Note the
combined secure and unsecured investments in any one bank should not exceed the cash limit
for that counterparty.
5.3.9 Investments in subordinated debt in projects delivered via the ‘Hubco/DBFM’ model included
within the permitted investments list will only be undertaken, following a full risk/benefit analysis,
subject to a maximum investment amount of £1.5m per project and for a maximum term of 30
years. 
5.3.10 For cash investments, there is a risk of capital loss arising from selling ahead of maturity if
combined with an adverse movement in interest rates and for term deposits and loans if they are
redeemed early. Therefore, the Council will undertake these investments in conjunction with its
cashflow/liquidity projections and medium-term financial plans to manage this risk. 
5.3.11 Within the Treasury Management code, it suggests the use of financial derivatives but given that
the legal power to use derivative instruments remains unclear, the Council does not intend to use
derivatives. Should the legal position change, the Council may seek to develop a detailed and
robust risk management framework, governing the use of derivatives, but prior to adoption, full
Council approval will be sought. 
5.4 Investment Security
5.4.1 Although the yield on investment is a key consideration, the primary principle governing the
Council’s investment criteria is the security of its investments. 
Page 180 of 248

Page 181

Appendix 1 
Treasury Management Strategy 2026/2027, Treasury Management Indicators and  
Prudential Indicators 2026/2027 to 2030/2031 
5.4.2 After this main principle the Council will ensure:
• It has sufficient liquidity in its investments, carefully selecting the maximum periods for
which funds may prudently be committed also applying the Council’s prudential and treasury
management indicators covering the maximum principal sums invested.
• It maintains a policy covering the categories of investment types it will invest in, the criteria
for choosing investment counterparties with adequate security, and to continually monitor
security. 
5.4.3 The Council minimises risk by identifying those financial institutions that it may invest in to
maximise security and liquidity of investment including the specification of maximum time and
money limits for each type of permitted investment offered by financial institutions. The
counterparty must meet the relevant credit rating requirement with the focus being on the
minimum acceptable quality adding a further security overlay to the investment activity of the
Council.
5.4.4 The Council utilises the research of the world’s foremost providers of independent credit ratings.
The ratings defining the likelihood of an investor such as the Council receiving their money back
on the terms in which it was invested. (Long term Rating types and definitions are shown in Annex
B).
5.4.5 The Council defines ‘high credit quality’ organisations and securities as those having a credit
rating of A- or higher that are domiciled in the UK or a foreign country with a sovereign rating of
AA+ or higher. For money market and other pooled funds, the Council defines a high credit rating
as those having a credit of A- or higher. Investments with organisations with long term ratings in
the BBB long term category will therefore be restricted by cash and maturity limits. 
5.4.6 The Council also supplements its credit rating information by accessing and applying additional
operational market information before making any specific investment decision from the agreed
pool of counterparties.
5.4.7 This additional market information will be applied to compare the relative security of differing
investment counterparties and will include:
• Credit Default swap prices;
• Quality financial press;
• Share prices;
• Government support status / Bank Resolution and Recovery Directive;
• Annual Reports;
• Statements to the market; and
• Financial Regulations;
5.4.8 Should this additional market information raise concerns regarding the security of a financial
institution, then subject to further investigation this may also result in removal from the list.
5.4.9 The creditworthiness of counterparties will be monitored regularly. The Council receives credit
rating information from Arlingclose Ltd (the Council’s advisors) as and when ratings change, and
counterparties are checked promptly. If a rating change results in the counterparty failing to meet
the Council’s strict criteria, they are removed immediately from the list. Similarly, if a counterparty
rating is updated and they meet the Council’s strict criteria, they will be added to the list.
5.4.10 Full details of the Council’s investment approach including the type of investments, treasury
management risks, associated controls, credit rating, money and time limits are shown in Annex
C. The credit rating criteria indicated within the Annex stipulates a long-term rating requirement
as this is considered the ultimate driver of credit worthiness of financial institutions. This
represents a rating agency view of an institutions capacity to honour its financial obligations and
its vulnerability to foreseeable events. The Council in conjunction with its advisors will continue to
monitor other information provided from credit rating agencies in terms of short term, individual
rating, support rating and outlook.
5.4.11 The Council will give due care when considering the country, group and sector exposure of the
Council’s investments and will endeavour to have no more than 25% placed with any non-UK
country at any time. A group of banks under the same ownership will be treated as a single 
Page 181 of 248

Page 182

Appendix 1 
Treasury Management Strategy 2026/2027, Treasury Management Indicators and  
Prudential Indicators 2026/2027 to 2030/2031 
organisation for limit purposes with industry /sector activity monitored regularly for
appropriateness.
5.4.12 The Council aims to be a responsible investor and will consider environmental, social and
governance (ESG) issues when investing. ESG considerations are increasingly a factor in global
investors’ decision making, but the framework for evaluating investment opportunities is still
developing and therefore the Council’s ESG policy does not currently include ESG scoring or
other real-time ESG criteria at an individual investment level. When investing in banks and funds,
the Council will prioritise banks that are signatories to the UN Principles for Responsible Banking
and funds operated by managers that are signatories to the UN Principles for Responsible
Investment, the UK Stewardship Code and/or the Net Zero Asset Managers Alliance.
5.5 Investment Strategy 
5.5.1 The Council, by efficient cashflow management and balance sheet analysis, will identify its
liquidity requirements and the core funds within its cash balances that could be locked in over a
longer period up to the maximum limits as defined within Annex C. This will achieve the optimum
performance, spreading investment periods and security of return, subject to over-riding credit
counterparty security.
5.5.2 The 2026/2027 Treasury Management Strategy has been developed assuming that the annual
borrowing requirement and debt repayments, net of credits due to the scheduled principal
repayments to the loans fund, will be fully funded by undertaking external borrowing. Therefore,
it is anticipated that the Council cash balances available for short term investment will average
approximately £60.0m throughout the period 2026/2027 to 2030/2031. 
5.5.3 This projected balance being subject to variation dependent upon actual level and timing of
external borrowing undertaken, which will reflect positive and negative movements in working
capital and level of revenue reserves/balances held during the 5-year period. 
5.5.4 As demonstrated by the liability benchmark reported in section 8.4 below, it is anticipated the
Council will be a long-term borrower, therefore new treasury investments will be made primarily
to manage day-to-day cash flows using short-term low risk instruments.
5.5.5 All investment activity will be governed by the principles laid out within sections 5.1 to 5.4 above
and 5.6 and 5.7 below.
5.6 Borrowing and the Investment of Money 
5.6.1 The Council will not borrow more than or earlier than required with the prime intention to profit
from the investment return of the extra sums borrowed. 
5.6.2 Borrowing in advance will only be taken for risk management reasons subject to sound
justification. When considering borrowing in advance the Council will balance investment risks,
such as the credit and interest risks resulting from the temporary investment of the proceeds of
borrowing, against the risk of adverse interest rate movements if borrowing is deferred.
Consideration will also be given to the existing debt maturity profile over the medium term.
5.6.3 The Council will appraise all risk associated with advance borrowing activity with subsequent
reporting either within the mid-year or annual reporting mechanism. This report will comply with
the minimum data and analytical requirements outlined within The Local Government Investments
(Scotland) Regulations 2010.
5.7 Non-Treasury Management Investment Activity
5.7.1 The CIPFA Treasury Management Code includes a section on Non-Treasury Management
investment activity, which would normally be for those investments made for policy reasons
outside of normal Treasury Management Activity, and may include: 
• service investments held clearly and explicitly in the course of the provision and for
purposes of operational services  
• commercial investments which are taken mainly for financial reasons and to achieve a
financial return  Page 182 of 248

Page 183

Appendix 1 
Treasury Management Strategy 2026/2027, Treasury Management Indicators and  
Prudential Indicators 2026/2027 to 2030/2031 
5.7.2 Normal treasury management activity would cover those investments which arise from the
organisation's cashflows and debt management activity and ultimately represent balances which
need to be invested until cash is required for use in the course of the Council's normal business. 
5.7.3 For investments that fall outwith normal treasury management activity the Council will ensure that
proper due diligence is carried out to ensure that there is a proper understanding as to:
• the powers under which the investment is made to ensure the activity is legal
• the service rationale behind the decision to undertake this type of investment 
• the extent to which capital invested is placed at risk 
• impact of any potential losses on the financial sustainability of the Council 
• the specialist professional advice required to assist in the decision-making process
5.7.4 The Council will carry out more careful risk assessment, as it recognises there may be instances
where such investments do not give priority for security and liquidity over yield whether due the
nature of the transaction itself e.g. commercial investments or for valid service reasons.
5.7.5 Effective scrutiny will be carried out and the justification behind the decision should be explicit,
clearly outlining that it is within the Councils legal powers, the level of risk to both capital and
returns, the requirement to seek specialist advice if sought and the potential impact on future
sustainability if risks come to pass. 
5.7.6 This would also include any external underwriting of those risks e.g. guarantees. Given the
increase in Councils creating ALEO’s and increasing partnership working, the Council may be
asked to provide a financial guarantee to enable other parties to access funds which may not
otherwise be available due to their size / lack of credit history. This may also result in external
funds being accessed at more favourable terms than they are likely to receive, which will accrue
both operational and financial benefit to the Council. 
5.7.7 In general, a financial guarantee is a promise to take responsibility for another company's financial
obligation if that company cannot meet its obligation. Prior to agreeing to the provision of a
financial guarantee, due financial diligence of the terms of the financial guarantee must be carried
out, including an assessment as to the likelihood of the guarantee being called and potential
financial liability to the Council. 
5.7.8 The responsibility for proper scrutiny and final approval is the Council’s Chief Officer (Finance
and Technology). Information in respect of non-Treasury Management investments must be
clearly laid out and available within the Council’s statutory accounts.
5.7.9 Following the PWLB consultation in the first half of 2020, the PWLB announced revised terms of
engagement for borrowing in particular around non-Treasury Management activity. Of greater
relevance in England and Wales, given recent activity, Councils are required to confirm there is
no intention to borrow for the purposes of acquiring investment assets primarily for yield e.g. retail
outlets, hotels in the current or next two financial years otherwise the facility may be suspended
or withdrawn fully.  The revised Prudential Code also makes it a requirement that local authorities
must not borrow to invest primarily for financial return.
6.0 Performance Measurement Indicators & Benchmarking 
6.1 The Code of Practice on Treasury Management requires the Council to use performance
indicators to assess the adequacy of the treasury management function over the year and
incorporate benchmarking to assess performance which is reported within the Annual Treasury
Management Activity report. These are distinct historic indicators, which are additional to the
predominantly forward-looking prudential indicators outlined in later sections of this report.
6.2 In respect of liquidity which is defined as the Council “having adequate, though not excessive
cash resources, borrowing arrangements, overdrafts or standby facilities to enable it at all times
to have the level of funds available to it which are necessary for the achievement of its
business/service objectives” (CIPFA Treasury Management Code of Practice) the Council will
seek to maintain: Liquid short term deposits of at least £3m available on an overnight basis.  
Page 183 of 248

Page 184

Appendix 1 
Treasury Management Strategy 2026/2027, Treasury Management Indicators and  
Prudential Indicators 2026/2027 to 2030/2031 
6.3 This Council generally uses the following historic indicators to monitor its loan portfolio
performance and benchmarking: 
 Borrowing: Average rate of borrowing for the year compared to average in previous year.
 Investments: Local measures of yield benchmarks are the Council’s average return on short
term investment activity in comparison to: 
- 3-month money market rate 
- Council’s own bank: Instant Access Account; 
- Council’s Advisors benchmarking club
6.4 In the context of benchmarking security, this is a much more subjective area to assess. The
Council currently evidences this by the application of minimum quality criteria to investment
counterparties, through the use of credit ratings, supplied by the three main credit rating agencies,
together with additional market information available as described earlier within this report and
outlined within Annex C. 
7.0 Treasury Management Local and Mandatory Indicators 2026/2027 to 2030/2031
7.1 Treasury Management Local Indicator: Interest Rate Exposure  
7.1.1 Per the revised CIPFA TM code, the Council is no longer required to set a mandatory indicator
for limits with regard to fixed and variable interest rate exposure. The Council will monitor its
interest rate exposure by the local indicator shown in Table 3 below. The proportion of fixed
interest rate costs to variable interest costs will be monitored on a quarterly basis to identify if
there are any potential risks if interest rates were to move significantly upwards.  The Council will
also monitor debt maturity profile, the spend profile of the capital programme and also continue
to adopt a prudent approach to use of internal balances in lieu of future long-term borrowing i.e.
monitor under borrowing position.  The economic outlook and interest rate forecast will
supplement this on-going review of interest rate exposure. 
7.1.2 Table 3 above relates only to external interest payments, excluding interest on revenue balances,
and includes a number of assumptions regarding the timing and nature of the new borrowing
anticipated. As mentioned previously the capital planning process and investment/borrowing
analysis enables the Council to take advantage of opportunities that may arise, to achieve
beneficial borrowing rates over the same period.
7.1.3 Table 3 highlights that the Council anticipates net loan external interest payments of
approximately £50.9 million for 2026/2027. Of this total, £52.9 million relates to interest payable
on fixed rate debt, for which interest payments are guaranteed until the loans mature and (£2.0)
million relates to interest receivable on funds invested. Variable rate funds deposited are subject
to changes in interest rates and will be monitored as part of the Council’s Treasury Management
Strategy on an ongoing basis.  
Content of loan portfolio
£m % £m % £m % £m % £m %
External Interest Council is due to pay:
Fixed rate loan debt 52.9 100.0% 66.9 100.0% 85.5 100.0% 101.2 100.0% 109.2 100.0%
Variable rate loan debt 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0%
52.9 100.0% 66.9 100.0% 85.5 100.0% 101.2 100.0% 109.2 100.0%
External Interest Council is due to receive:
Investments - variable terms 2.0 100.0% 2.0 100.0% 2.0 100.0% 2.0 100.0% 2.0 100.0%
Net Loan Interest Payments 50.9 64.9 83.5 99.2 107.2
Table 3 - Loan Indicators Interest Rate Exposures 2026/27 to 2030/31
2026/27 2027/28 2028/29 2029/30 2030/31
Page 184 of 248

Page 185

Appendix 1 
Treasury Management Strategy 2026/2027, Treasury Management Indicators and  
Prudential Indicators 2026/2027 to 2030/2031 
7.1.4 The table below highlights the estimated impact of a one basis point increase or decrease (e.g.
4.0% variable rate rising to 5.0% or falling to 3.0%) in interest rates to treasury management
costs/income for next year. Fixed interest rate debt will not be affected by interest rate changes. 
7.2 Treasury Management Mandatory Indicator: Maturity Structure of Borrowing
7.2.1 The Treasury Management Code requires the Council to specify upper and lower limits regarding
the maturity structure of its long-term borrowing in order to minimise the risk associated with the
Council having to replace large sums of long-term debt at a time when there may be uncertainty
over interest rate exposure.
7.2.2 Table 3 illustrates that the Council has high levels of fixed rate debt however the current maturity
profile of this debt is unlikely to be a major risk factor for the Council. The limits of fixed and
variable rate maturity are set out within Table 5 below; 
7.2.3 The upper limit for long-term rate debt, maturing in less than 12 months, is set at 15.0% to
accommodate the requirement within CIPFA TM Code to recognise the possibility of the Council
loans classified as LOBO type loans having their option or call exercised within the next 12
months, under the terms of the loans as described within paragraph 4.15 above.
7.3 Treasury Management Indicator: Credit Risk
7.3.1 The Council will manage its credit risk by implementing the investment strategy per Section 5 and
remaining within the guidelines outlined within Annex C. 
7.3.2 The Council has also adopted a voluntary measure of its exposure to credit risk by monitoring the
value weighted average credit rating of its investment portfolio. This is calculated by applying a
score to each investment and taking the arithmetic average weighted by the size of each
investment. 
Target
Portfolio Average Credit Rating A-                      
Table 6 – Credit Risk Indicator 2026/27
8.0 Prudential Indicators 2026/2027 to 2030/2031
8.1 Prudential Indicator:  The Capital Expenditure Plans
8.1.1 The Prudential Code requires the Council to outline its capital expenditure plans taking into
account the sources of funding available and also the cost to the council in supporting any
additional borrowing burden which will require to be paid for from the Council’s own resources.
The Government has power to control the level of prudential borrowing although no control has
yet been implemented. Some of the estimates for other sources of funding may also be subject
to change over this timescale.
8.1.2 Table 7 sets out the revised Capital Expenditure plans for 2025/2026 (Outturn) and forecast for
the period 2026/2027 to 2030/2031 incorporating the 5-year Strategic Capital Investment
Programme (2024/25 to 2028/29) approved by the Policy and Strategy Committee on 13 March
2025, and reviewed on a continual basis by the Strategic Capital Delivery Group (SCDG)
including re-profiling adjustments within the 5 year programme and longer-term capital
investment programmes including HRA and City Deal. It should be noted therefore that the
estimates presented within this report are based on the current forecasts of the progression of
the programmes and projected resources available.
Financial Year:  2026/2027 Estimate £m +1%
£m
-1%
£m
Net Impact on Council (2.0) (0.6) +0.7
Table 4 - Sensitivity to Interest Rate Movements 2026/27
Maturity Structure of Borrowing <12 months 12m to
2 years
2 to
5 yrs
5 to
10 yrs
10 to
20 yrs
20 to
30 yrs
30 to
40 yrs
40 to
50 yrs 50 yrs+
Upper limit - long term debt 15.00% 15.00% 35.00% 35.00% 25.00% 25.00% 15.00% 15.00% 15.00%
Lower limit - long term debt 0.00% 0.00% 10.00% 10.00% 5.00% 0.00% 0.00% 0.00% 0.00%
Table 5 - Maturity Structure of Fixed Rate Borrowing
Page 185 of 248

Page 186

Appendix 1 
Treasury Management Strategy 2026/2027, Treasury Management Indicators and  
Prudential Indicators 2026/2027 to 2030/2031 
8.1.3 General Services within Table 7 above encompasses the Capital Financing Requirement,
reflecting the borrowing needs, for the General Fund Community Investment Programme which
includes City Deal, Town and Community Hubs, Maintaining Existing Assets, Office
Rationalisation & Carbon Management, Greenspace & Cemeteries, Roads & Street Lighting,
Operational, Infrastructure & Transportation Development, Economic Regeneration, Digital
Infrastructure & Innovation and Community Board Investment Fund, whilst HRA includes the New
Build, Buy Back Scheme, Mainstream and Ambition programmes. 
8.1.4 Following implementation of IFRS16 Leases in 2024/25, further estimates of £19.9m are included
for future estimates of annual recalculation of lease liabilities. Members should note that this was
a change in accounting treatment of leases and does not represent additional cash expenditure.
8.2 Prudential Indicator: Capital Financing Requirement (CFR)
8.2.1 The CFR is essentially a measure of Council’s underlying borrowing need i.e. capital expenditure
which is not resourced by capital grants, receipts or CFCR - and any new borrowing will increase
the CFR. The CFR includes long term liabilities representing outstanding obligations under the
education PPP/DBFM finance leasing arrangements and the Clyde Valley Waste Facility plus
IFRS16 Leases implications. 
8.2.2 However the Council pays off an element of the accumulated capital spend each year through a
revenue charge, comprising scheduled debt repayments from service departments (annuity
based) which reduces the CFR. Committee is asked to approve the CFR projections at the 31
March for each financial year set out below. 
Capital Expenditure
2025/26
Outturn
£m
2026/27
Forecast
£m
2027/28
Forecast
£m
2028/29
Forecast
£m
2029/30
Forecast
£m
2030/31
Forecast
£m
Capital Expenditure: General Services 155.0 155.2 175.0 256.0 82.5 43.6
Capital Expenditure: HRA 140.5 174.1 166.0 202.4 174.0 183.7
Total Capital by Expenditure 295.5 329.3 341.0 458.4 256.5 227.3
IFRS16: PPP Contracts 4.9 4.6 4.7 2.8 3.4 (0.5)
Service Concessions:  PPP Schools 9.1 11.3 11.5 12.7 12.1 13.2
Total Capital by Credit Arrangements 14.0 15.9 16.2 15.5 15.5 12.7
Total Capital Investment 309.5 345.2 357.2 473.9 272.0 240.0
Financed By:
Capital Grants 103.0 61.7 67.6 51.4 72.2 50.6
Capital from Current Revenue 33.1 27.9 27.9 27.9 27.9 27.9
Capital Receipts 2.2 3.4 3.4 0.3 0.0 0.0
CFR: Borrowing: General Services 75.0 114.3 128.2 228.4 34.5 17.2
CFR: Borrowing: HRA 82.2 122.0 113.9 150.4 121.9 131.6
Credit Arrangements 14.0 15.9 16.2 15.5 15.5 12.7
Total Capital Funding Resources 309.5 345.2 357.2 473.9 272.0 240.0
Table 7 - Capital Expenditure Plans 2025/26 to 2030/31
Page 186 of 248

Page 187

Appendix 1 
Treasury Management Strategy 2026/2027, Treasury Management Indicators and  
Prudential Indicators 2026/2027 to 2030/2031 
8.2.3 The year-on-year movement in CFR is shown in Table 9 below. 
8.2.4 The scheduled loan debt, education PPP amortisation and credit arrangement figures presented
within Table 9 above are based on the estimated profile of the Strategic Capital Investment
Programme 2024/2025 to 2028/2029, and implementation of the changes to accounting for
service concessions as a result of Scottish Government fiscal flexibilities options applied in
2023/2024 and IFRS16 Leases in 2024/2025.
8.3 Prudential Indicator: Gross Debt and the Capital Financing Requirement:
8.3.1 Within the prudential indicators there are a number of key indicators to ensure the Council
operates its activities within well-defined limits. For the first of these the Council needs to ensure
that its total borrowing, does not, except in the short-term, exceed the total of the CFR in the
preceding year plus the estimates of any additional CFR for 2026/2027 and the next four financial
years. 
8.3.2 The above table demonstrates that healthy prudential margins will continue to exist from
2026/2027 onwards and that the Council complies with this prudential indicator in the current year
and does not envisage difficulties in the future. This view takes into account current commitments,
existing plans and the proposals in respect of the capital investment levels proposed.  
Capital Financing Requirement
2025/26
Outturn
£m
2026/27
Forecast
£m
2027/28
Forecast
£m
2028/29
Forecast
£m
2029/30
Forecast
£m
2030/31
Forecast
£m
General Services 1,060.0 1,160.2 1,273.0 1,481.7 1,493.9 1,483.7
HRA 629.6 735.7 832.5 963.7 1,064.0 1,171.6
Total CFR 1,689.6 1,895.9 2,105.5 2,445.4 2,557.9 2,655.3
Movement in CFR 129.5 206.3 209.6 339.9 112.5 97.4
Table 8 - CFR Projections 2025/26 to 2030/31
2025/26
Outturn
£m
2026/27
Forecast
£m
2027/28
Forecast
£m
2028/29
Forecast
£m
2029/30
Forecast
£m
2030/31
Forecast
£m
CFR  : Borrowing : General Services 75.0 114.3 128.2 228.4 34.5 17.2
CFR  : Borrowing : HRA 82.2 122.0 113.9 150.4 121.9 131.6
Credit Arrangements 14.0 15.9 16.2 15.5 15.5 12.7
Scheduled Loan Debt Amortisation (26.2) (29.0) (32.0) (36.2) (41.8) (45.6)
Leasing Amortisation (2.6) (1.4) (0.9) (0.9) (0.5) (0.5)
Education PPP Amortisation (12.9) (15.5) (15.8) (17.3) (17.1) (18.0)
Movement in CFR 129.5 206.3 209.6 339.9 112.5 97.4
Table 9 - Movements in CFR 2025/26 to 2030/31
2025/26
Outturn
£m
2026/27
Forecast
£m
2027/28
Forecast
£m
2028/29
Forecast
£m
2029/30
Forecast
£m
2030/31
Forecast
£m
Gross Borrowing : Loan Debt 1,100.4 1,320.1 1,552.7 1,917.3 2,038.6 2,140.4
Long Term Liabilities 295.4 294.5 294.0 291.2 289.2 283.4
Gross Debt 1,395.8 1,614.7 1,846.7 2,208.6 2,327.8 2,423.7
Capital Financing Requirement 1,689.6 1,896.0 2,105.6 2,445.3 2,557.9 2,655.3
Prudential Margin 293.8 281.3 258.9 236.8 230.1 231.5
Gross Debt =< Future 3 Year CFR Yes Yes Yes Yes Yes Yes
Table 10 - Prudential Margins 2025/26 to 2030/31
Page 187 of 248

Page 188

Appendix 1 
Treasury Management Strategy 2026/2027, Treasury Management Indicators and  
Prudential Indicators 2026/2027 to 2030/2031 
8.4 Prudential Indicator: Liability Benchmark
8.4.1 The Treasury Management Code states that organisations should evaluate the amount, timing
and maturities needed for new borrowing in relation to planned borrowing needs, for example
using a liability benchmark, in order to avoid borrowing too much, too little, too long or too short.
The liability benchmark is an important tool to help establish whether the Council is likely to be a
long-term borrower or long-term investor in the future and therefore shapes its strategic focus and
decision making. Essentially this benchmark identifies the projection of external debt/ borrowing
required over the long term to fund approved revenue & capital budgets, while keeping treasury
investments at the minimum level required to manage day-to-day cash flow. 
8.4.2 This represents the comparison of the Council’s actual borrowing against an alternative strategy.
A liability benchmark has been calculated showing the lowest risk level of borrowing. This utilises
the forecasts for Capital Financing Requirement, long-term liabilities, current external borrowing,
balance sheet resources i.e. reserves, and that cash and investment balances are kept to a
minimum of £30.0m at each year-end to maintain sufficient liquidity but minimise credit risk. 
8.4.3 This is shown in the chart below together with the maturity profile of the Council’s existing
borrowing; 
31/3/25
Actual
£m
31/3/26
Forecast
£m
31/3/27
Forecast
£m
31/3/28
Forecast
£m
31/3/29
Forecast
£m
31/3/30
Forecast
£m
31/3/31
Forecast
£m
Loans CFR 1,263.2 1,394.2 1,601.4 1,811.6 2,154.1 2,268.7 2,371.9
less Balance Sheet Resources (357.1) (345.7) (332.8) (332.8) (332.8) (334.8) (336.3)
Net Loans Requirement 906.1 1,048.4 1,268.6 1,478.8 1,821.3 1,933.9 2,035.5
plus: Liquidity Allowance 30.0 30.0 30.0 30.0 30.0 30.8 31.5
Liability Benchmark 936.1 1,078.4 1,298.6 1,508.8 1,851.3 1,964.7 2,067.0
Existing Borrowing 987.6 986.9 713.6 640.7 571.9 503.6 437.3
New Borrowing Required 0.0 91.6 585.0 868.1 1,279.4 1,461.0 1,629.7
0
500
1,000
1,500
2,000
2,500
2025 2027 2029 2031 2033 2035 2037 2039 2041 2043 2045 2047 2049 2051 2053 2055
£m
Liability Benchmark - North Lanarkshire
Fixed rate loans LOBO loans Loans CFR Liability benchmark Net loans requirementPage 188 of 248

Page 189

Appendix 1 
Treasury Management Strategy 2026/2027, Treasury Management Indicators and  
Prudential Indicators 2026/2027 to 2030/2031 
8.4.4 The Loans CFR line (solid light blue) represents the total cost of the capital expenditure plans
based on the estimated profile of the capital investment programme to 2030/2031. This reduces
over time as scheduled principal repayments are made to the loans fund. The Net Loans
Requirement line (dotted red) represents the minimum external borrowing required to fund the
current capital expenditure plans assuming all cash reserves and balances are utilised to offset
borrowing requirements.  The Liability Benchmark line (solid red) represents the estimated
borrowing required, taken account of liquidity allowance required of £30.0m to be held to maintain
liquidity and to manage day-to-day cashflows.
8.4.5 The solid grey section shows the maturity profile of current borrowing. The gap between the grey
section and the liability benchmark line represents the estimated additional borrowing that is
forecast will be required to fund the current capital expenditure plans, via long-term and short-
term borrowing options.
8.5 Prudential Indicator: The Authorised Limit for External Debt.
8.5.1 This represents the maximum limit beyond which borrowing is prohibited. Although this limit is
deemed to be affordable in the short-term, it is not desirable or a sustainable level of borrowing
for the council and is therefore being set at a level as the maximum allowable in each of the years
2026/2027 through to 2030/2031. The initial level set for 2025/2026 is shown for comparison. The
Local Authority (Capital Finance and Accounting) (Scotland) Regulations 2016 provide a statutory
backing to the Prudential Code requirement for an authority to set an authorised limit for external
debt. 
8.6 Prudential Indicator: The Operational Boundary for External Debt. 
8.6.1 This indicator is based on the expected maximum external debt during the course of the year; it
is not a limit. This operational boundary allows flexibility to borrow, re-invest and undertake debt
restructuring during the course of the year. It is therefore possible and acceptable, for actual
borrowing to vary around this boundary for short periods during the year. 
8.7 Prudential Indicators: Affordability 
8.7.1 The previous sections cover the treasury management and overall capital and control of
borrowing prudential indicators, but within this framework, prudential indicators are required to
assess the affordability of the capital investment plans. These provide an indication of the impact
of the capital investment plans on the overall Council finances. The Council is asked to approve
the following affordability indicator.
8.8 Prudential Indicator: The Proportion of Financing Costs to Net Revenue Stream.
8.8.1 Since capital expenditure impacts on the revenue budget through financing charges, the Council
needs to ensure that financing costs not only remain affordable but also do not constitute an
excessive proportion of the revenue resources available. The proportion of capital financing costs 
Authorised Limit
2025/26
Initial Limit
£m
2026/27
Estimated
£m
2027/28
Estimated
£m
2028/29
Estimated
£m
2029/30
Estimated
£m
2030/31
Estimated
£m
Gross Borrowing : Loan Debt 1,524.0 1,540.0 1,840.0 2,070.0 2,190.0 2,240.0
Long Term Liabilities 325.0 301.0 300.0 298.0 296.0 290.0
Total External Debt 1,849.0 1,841.0 2,140.0 2,368.0 2,486.0 2,530.0
Table 11 - Authorised Limit 2025/26 to 2030/31
Operational Boundary
2025/26
Initial Limit
£m
2026/27
Estimated
£m
2027/28
Estimated
£m
2028/29
Estimated
£m
2029/30
Estimated
£m
2030/31
Estimated
£m
Gross Borrowing : Loan Debt 1,474.0 1,350.0 1,580.0 1,950.0 2,070.0 2,170.0
Long Term Liabilities 325.0 295.0 294.0 292.0 290.0 284.0
Total External Debt 1,799.0 1,645.0 1,874.0 2,242.0 2,360.0 2,454.0
Table 12 - Operational Boundary 2025/26 to 2030/31
Page 189 of 248

Page 190

Appendix 1 
Treasury Management Strategy 2026/2027, Treasury Management Indicators and  
Prudential Indicators 2026/2027 to 2030/2031 
to revenue forecasts for the next 5 years are illustrated in Table 13 below showing that the General
Services loan charges represent up to 8.34% of the total revenue budget available. The increase
in the proportion still remains within prudent levels demonstrating that the capital programme
investment appears to be affordable and sustainable.
8.8.2 In noting the percentage on loan charges within the HRA budget, a major element of revenue
costs in the Housing Account is the funding support to sustain the substantial investment
programme; the other main elements of expenditure being repair costs and management costs.
The level of loan charges is acceptable and deemed prudent and affordable within the framework
of the Council’s 30-year Housing investment plan. 
8.8.3 The estimated loan charges, PPP and credit arrangement amortisation figures presented within
Table 9 above are based on the estimated profile of the Strategic Capital Investment Programme
2024/2025 to 2028/2029, and implementation of the changes to accounting for service
concessions as a result of Scottish Government fiscal flexibilities options applied in 2023/2024
and IFRS16 Leases in 2024/2025.
8.9 Prudential Indicator: Affordability – Sensitivity Analysis 
8.9.1  For the Prudential Indicators relating to affordability, the table within Annex E provides a summary
of the sensitivity of the most likely outcomes outlined within the preceding paragraphs provided
above to the following movements, all assessed independently of each other:
(i) a plus or minus 10% change in the capital financing requirement i.e. the level of borrowing
undertaken to retain average investment balances and under borrowing position at prudent levels.
(ii) a plus or minus 50 bps change in the interest rates achievable for new long-term borrowing i.e.
½ percent movement 
(iii) a plus or minus 10% change in the net revenue stream used to calculate the proportion of
financing costs to net revenue stream.  
2026/27
Estimated
£m
2027/28
Estimated
£m
2028/29
Estimated
£m
2029/30
Estimated
£m
2030/31
Estimated
£m
Total General Fund (GF) Loan Charges 46.5 55.6 68.1 81.0 84.5
Total General Fund Finance Lease / PPP Costs 15.5 14.8 14.5 14.0 13.7
Total General Fund : Capital Financing Costs 62.0 70.4 82.6 95.0 98.2
General Fund : Net Revenue Stream 1,149.2 1,158.4 1,164.7 1,169.4 1,176.7
5.40% 6.08% 7.10% 8.12% 8.34%
45.5 53.0 63.3 71.4 79.3
0.4 0.4 0.3 0.0 0.0
Total HRA : Capital Financing Costs 45.9 53.4 63.6 71.4 79.3
HRA : Net Revenue Stream 184.6 194.5 205.5 215.5 226.9
24.87% 27.44% 30.93% 33.14% 34.95%
Table 13 - Proportion of Financing Costs to Net Revenue Stream 2026/27 to 2030/31
Proportion of Financing Costs to Net Revenue
Stream
GF - Proportion of Financing Costs to Net
Revenue Stream
HRA - Proportion of Financing Costs to Net
Revenue Stream
Total Housing Reveue Account (HRA) Loan Charges
Total Housing Reveue Account Finance Lease Costs
Page 190 of 248

Page 191

Appendix 1 
Treasury Management Strategy 2026/2027, Treasury Management Indicators and  
Prudential Indicators 2026/2027 to 2030/2031 
9.0 Policy on Repayment of Loans Fund Advances 2026/2027 
9.1 The Local Authority (Capital Finance and Accounting) (Scotland) Regulations 2016 (as amended
in 2024) within Regulation 13 require the Council to make a loans fund advance equal to the
amount of capital expenditure that the Council has determined will be financed by borrowing. The
Capital Expenditure definition being that adopted by proper accounting practice, the statutory
control framework and the Prudential Code.
9.2 Loans fund advances also incorporate grants to third parties on third party assets and loans to
third parties where the other party meets the criteria laid out within Part 3 of the Regulations e.g.
other local authorities or joint boards.
9.3  Accounting for loans fund advances also changed from 1st April 2016. Prudent repayment of
loans fund advances are required to be made in line with Scottish Government Statutory
Guidance on Loans Fund Accounting (Circular 7/16). 
9.4 The broad aim of prudent repayment is to ensure that the Council’s unfinanced capital expenditure
is financed over a period of years which that expenditure is expected to provide a benefit, and
that each year's repayment amount is reasonably commensurate with the period and pattern of
the benefits. Where a loans fund advance is made for an asset, that period will be the asset’s
useful life. Where an asset life cannot reasonably be established, the repayment period will not
exceed 50 years.
9.5 The statutory guidance requires the Council to approve a policy on loans fund repayments each
year and it is proposed the Council adopts the following options for calculating prudent
repayments in 2026/27.
9.6 For pre-existing Loans Fund advances made up to 31st March 2016 and for the most part capital
expenditure plans for the period up to and including the 31 March 2021, the Council continued to
use Option 1: Statutory Method. This approach taking into account the 5-year transitional period
from 31/3/2016 to 31/3/2021 available within the new guidance, during which the current
methodology may continue to be selected.  The repayment of Loans Fund advances therefore
being equal to the annual amount determined in accordance with Schedule 3 of the Local
Government (Scotland) Act 1975.
9.7 However the Council undertook an initial review of the loans fund advances annuity models in
2021/22 and a review of the initial asset lives adopted and determined it would be prudent to
adopt Option 3: Asset Life Method, with the Council applying this option accordingly for
2020/2021. This approach allowed a retrospective review for ‘prudent repayment’ of all historic
loans fund advances outstanding at 31 March 2020 with no distinction made between debt held
prior to 31 March 2016 and since the prudent repayment methodology was introduced on 1 April
2016. 
9.8 Following this initial exercise, a further review was carried out during 2020/2021 in conjunction
with Treasury specialists to investigate further adaptations to the repayments policy. Per the
report submitted to this Committee on the 26 November 2020 entitled Loans Fund Advance
Repayment Policy Review a revised policy was approved. 
9.9 This included the application of a fixed average life to all loans fund advances, and changes to
the annuity rate adopted to calculate loans fund advance repayments, including the retrospective
adjustment to the period over which historic loans fund advance repayments can be made and
applying this approach to future loans fund advances going forward. The repayment periods and
annuity rate can be updated in future years, if deemed prudent to do so, to reflect the changing
nature and durability of assets financed by loans fund advances linked to Treasury Management
strategy. 
9.10 The revised Policy resulted in a revised loans fund advance repayment profile, the Council
adopting the flexibility within the policy and will consider alternative approaches including
reprofiling back to initial advance date.  A prudent approach specific to the Council’s financial
position will be adopted including an assessment of the whole life impact both in nominal and
NPV terms of this proposal.
9.11 Alternatively if it is determined that it may be prudent to recognise grant funding or other income
streams when determining both the period of the repayment and/or the annual repayment of any 
Page 191 of 248

Page 192

Appendix 1 
Treasury Management Strategy 2026/2027, Treasury Management Indicators and  
Prudential Indicators 2026/2027 to 2030/2031 
loans fund advance, Option 4 Funding/Income profile method will be selected. Some examples
of where this income approach may be considered prudent would include the deferred UK and
Scottish Government grant support for the City Deal. Therefore, for capital expenditure incurred
for specified projects where it is reasonable to link an income /funding stream, the annual
repayment of Loans Fund advances may be profiled to reflect the income/funding stream. The
Council will keep the income streams under review to ensure the provision for repayment remains
prudent and, if required, address any shortfall.
9.12 The Statutory Guidance, allows a further option referred to as Option 2: the Depreciation method
within the guidance and after due consideration the Council did not adopt this in 2021/2022. 
9.13 The Council made use of the permitted short-term financial flexibility to defer Loans Fund
repayments in 2022/23 which has resulted in higher repayments in the following 20 years.
9.14 In accordance with the Statutory Guidance, the Council has outlined within Annex F its
commitments in respect of loans fund advance repayments, however these are based on the
estimated profile of the Strategic Capital Investment Programme 2024/2025 to 2028/2029 and
the implementation of approved loans funds advance repayment policy and service concessions
arrangements. Material changes to these estimates/forecasts will be reported during the quarterly
Treasury Management Monitoring Process. 
9.15 In accordance with the statutory guidance the HRA Loans Fund advances and associated annual
repayments have been identified separately from that of the General Fund.
9.16 Loans Fund advances are not made for credit arrangements such as leases and service
concession (PFI/PPP) arrangements, but a statutory charge to revenue similar to a Loans Fund
repayment is made to repay the associated debt. Except where flexible arrangements have
previously been approved, the charge will be equal to the contractual unitary payment due for the
financial year after deducting (a) those amounts which have been already charged to revenue
such as interest and (b) actual or prepaid lifecycle replacement costs.
Page 192 of 248

Page 193

Annex A
Treasury Management Policy Statement & Clauses adopted 
The Treasury Management Policy Statement adopted by North Lanarkshire Council: 
1. The Council defines its Treasury Management activities as:
“The management of the organisation’s borrowing investments and cash flows, its banking,
money market and capital market transactions; the effective control of the risks associated
with those activities; and the pursuit of optimum performance consistent with those risks.”
2. The Council regards the successful identification, monitoring and control of risk to be the
prime criteria by which the effectiveness of its treasury management activities will be
measured. Accordingly, the analysis and reporting of treasury management activities will
focus on their risk implications for the Council and any financial instruments entered into to
manage these risks.
3. The Council acknowledges that effective treasury management will provide support towards
the achievement of its business and service objectives. It is therefore committed to the
principles of achieving value for money in treasury management, and to employing suitable
comprehensive performance measurement techniques, within the context of effective risk
management.
4. The Council adopts a high-level approach to setting policies for borrowing and investment
activity having in place an appropriate scheme of delegation and ensuring all staff employed
in Treasury Management have the suitable skills and resources to carry out delegated
treasury management activities effectively, efficiently and achieving value for money. 
CIPFA Treasury Management code clauses formally adopted by North Lanarkshire
Council:
1. This Council will create and maintain, as the cornerstones for effective treasury management:
•  A treasury management policy statement, stating the policies, objectives and approach
to risk management of its treasury management activities;
• Suitable treasury management practices (TMPs), setting out the manner in which the
Council will seek to achieve those policies and objectives, and prescribing how it will
manage and control those activities.
2. The Council will receive reports on its treasury management policies, practices and activities,
including as a minimum, an annual strategy and plan in advance of the year, a mid-year
review and an annual report after its close, in the form prescribed in its TMPs.
3. The Council delegates responsibility for the development of the Treasury Management
Strategy and implementation and monitoring of its treasury management policies and
practices to the Finance and Resources Committee and for the execution and administration
of treasury management decisions to the Chief Officer (Finance), who will act in accordance
with the Council's Treasury Policy statement and TMPs and CIPFA's Standard of
Professional Practice on Treasury Management.
4. The Audit and Scrutiny Panel will be responsible for ensuring effective scrutiny of the
Treasury Management Strategy and policies as part of its work on reviewing the internal
financial controls of the Council.
5. In accordance with The Local Government Investments (Scotland) Regulations 2010, the
Council is responsible for the approval of the Annual Investment Strategy and Annual
Investment Report. 
Page 193 of 248

Page 194

Annex B
Explanation of Long-Term Rating Definitions 
Type of Rating Rating Explanation
Fitch – long-term
AAA
Indicates exceptionally strong capacity for timely payment of
financial commitments and this capacity is highly unlikely to be
adversely affected by foreseeable events. 
AA-
Indicates very strong capacity for timely payment of financial
commitments and this capacity is not significantly vulnerable to
foreseeable events. 
A-
Indicates strong capacity for timely payment of financial
commitments. This capacity may, nevertheless, be more
vulnerable to changes in circumstances or in economic
conditions than is the case for higher ratings.
BBB
Indicates an adequate capacity for timely payment of financial
commitments but adverse business or economic conditions
more likely to impair this capacity. 
Moody’s – long-term
Aaa
Offer excellent credit quality, with susceptibility to long-term
risks that are mostly unlikely to materially impair the banks
strong position.
Aa
Offer excellent credit quality, with susceptibility to long-term
risks with a vulnerability to greater fluctuations within
protective elements.
A Offer excellent credit quality, but elements suggest a
susceptibility to impairment over the long-term.
Baa Rated as medium grade, with some speculative elements and
moderate credit risk.
Standard & Poor’s -
long-term AAA Indicates extremely strong capacity for timely payment of
financial commitments
AA- Indicates very strong capacity for timely payment of financial
commitments 
A-
Indicates strong capacity for timely payment of financial
commitments This capacity may, nevertheless, be more
susceptible to the adverse effects of changes in circumstances
or in economic conditions than is the case for higher rated
category.
BBB
Indicates an adequate capacity for timely payment of financial
commitments but adverse business or economic conditions
more likely to impair this capacity. 
Page 194 of 248

Page 195

Annex C
Permitted Investments, Associated Controls, Credit Rating, Money and Time Limits 
Type of Investment Treasury Management Risks Mitigating Controls Credit Rating
Money
Limits
Time   
Limits
a. Deposits with the Debt
Management Account
Facility (UK Government). 
Deposit with the UK Government and
as such credit/counterparty and
liquidity risk is very low, and there is
no market risk to the principal sum.
Little mitigating controls required
as this is a UK Government
investment. The monetary limit is
unlimited to allow for a safe
haven for investments. The
sovereign rating is monitored with
the impact of any changes to this
sovereign rating evaluated and
removal of the investment from
the permitted list if necessary.
Long-term
rating
n/a No limit  up to a
max of
364 days
b. Deposits with other local
authorities or public
bodies 
Quasi UK Government debt and as
such credit/counterparty risk is very
low, and there is no market risk to
principal sum.  Liquidity may present
a problem as deposits can only be
broken with the agreement of the
counterparty, and penalties can
apply. 
Little mitigating controls required
for local authority deposits, as
this is a quasi-UK Government
investment. The sovereign rating
is monitored with the impact of
any changes to this sovereign
rating evaluated and removal of
the investment from the permitted
list if necessary.
Long-term
rating 
n/a £20m Up to a
max
period of 3
years
c. Instant Access Accounts  These tend to be low risk
investments but will exhibit higher
risks than categories (a) and (b)
above.
These investments are subject to risk
of loss via bail-in should the regulator
determine that the bank is failing or
likely to fail. 
Lending will be restricted to those
counterparties meeting the credit
rating criteria with the selection
defaulting to the lowest available
credit rating to provide additional
risk control measures.
Assessment of credit worthiness
will be further strengthened by
the use of additional market
intelligence including credit
default swaps, sovereign support
and share price data. 
Long-term
rating 
Above or
equal to A-
or
equivalent
£20m Daily
access if
required
BBB or
equivalent
£10m
Page 195 of 248

Page 196

Annex C
Permitted Investments, Associated Controls, Credit Rating, Money and Time Limits 
Type of Investment Treasury Management Risks Mitigating Controls Credit Rating
Money
Limits
Time   
Limits
d. Call Accounts These tend to be low risk
investments but will exhibit higher
risks than categories (a) to (c) above. 
With this type of investment liquidity
can be low or high, determined by
the call account facility adopted e.g.
35 days. Call deposits can only be
broken with the agreement of the
counterparty, and penalties may
apply.
These investments are subject to risk
of loss via bail-in should the regulator
determine that the bank is failing or
likely to fail.
Lending will be restricted to those
counterparties meeting the credit
rating criteria with the selection
defaulting to the lowest available
credit rating to provide additional
risk control measures.
Assessment of credit worthiness
will be further strengthened by
the use of additional market
intelligence including credit
default swaps, sovereign support
and share price data.
Long-term
rating 
Above or
equal to A- or
equivalent
£20m up to a
max of
364 days 
BBB or
equivalent
£10m up to a
max of 30
days.
e. Term Deposits  These tend to be low risk
investments but will exhibit higher
risks than categories (a) to (d)
above. With this type of investment,
liquidity is low, and term deposits can
only be broken with the agreement of
the counterparty, and penalties may
apply. 
These investments are subject to risk
of loss via bail-in should the regulator
determine that the bank is failing or
likely to fail. 
Lending will be restricted to those
counterparties meeting the credit
rating criteria with the selection
defaulting to the lowest available
credit rating to provide additional
risk control measures.
Assessment of credit worthiness
will be further strengthened by
the use of additional market
intelligence including credit
default swaps, sovereign support
and share price data.
Long-term
rating 
Above or
equal to A- or
equivalent
£20m up to a
max of
364 days.
BBB or
equivalent
£10m up to a
max of 30
days.
Page 196 of 248

Page 197

Annex C
Permitted Investments, Associated Controls, Credit Rating, Money and Time Limits 
Type of Investment Treasury Management Risks Mitigating Controls Credit Rating
Money
Limits
Time   
Limits
f. Money Market Funds
(MMFs)
The Council is no longer guaranteed
preservation of capital i.e. for every £1
of principal invested the fund will no
longer guarantee a return £1 of
principal on withdrawal.
However the day to day operation of
LVNAV funds is very similar and has
many of the attractive features of the
former Constant Net Asset Value
(CNAV) fund and the probability of
the price changing and loss of
capital, within the boundaries set for
price changes i.e. “the collar”, is
widely regarded as de minimis. 
Two types of funds are available
to the Council   
• a Public Debt CNAV (assets
invested in government debt);
and
•  a ‘Low Volatility NAV’
(LVNAV) 
The Council will not use Variable
NAV Funds.
Assessment of credit worthiness
will be underpinned by additional
market intelligence including
credit default swaps, sovereign
support and share price data and
information regularly received
from the Council’s Treasury
Advisors Arlingclose Ltd. 
Long-term
rating
n/a £10m
per
MMF
fund up
to a
max of
£60m
in total
or 0.5%
of fund
size. 
Daily
access if
required 
g. Instant Access Funds
held with Council’s own
bankers 
These tend to be low risk
investments but will exhibit higher
risks than categories (a), (b) and (c)
above. 
These investments are subject to risk
of loss via bail-in should the regulator
determine that the bank is failing or
likely to fail. 
If the council’s own bankers fail to
meet the credit rating criteria per
c) above, for operational
purposes limited funds may be
held within this account but the
Council will ensure funds kept at
the lowest levels manageable
Long-term
rating
n/a n/a Overnight
basis only
Page 197 of 248

Page 198

Annex C
Permitted Investments, Associated Controls, Credit Rating, Money and Time Limits 
Type of Investment Treasury Management Risks Mitigating Controls Credit Rating
Money
Limits
Time   
Limits
h. Government Gilts and
Treasury Bills 
These are marketable securities
issued by the UK Government and
as such counterparty and liquidity
risk is very low, although there is
potential risk to the market value
arising from an adverse movement in
interest rates (no loss if these are
held to maturity).
Little mitigating controls required
as this is a UK Government
investment. The monetary limit is
unlimited to allow for a safe
haven for investments. Any
changes to the sovereign rating is
evaluated and the removal of this
type of investment from the
permitted list if necessary.
Assessment of credit worthiness
will be further strengthened by
additional market intelligence
including credit default swaps,
sovereign support and share
price data.
Cashflow management tools will
endeavour to ensure that this
type of investment is held until
maturity to limit market risk.
Long-term
rating
n/a No limit Up to a
max
period of 5
years 
i. Supranational Bonds  These are bonds issued by
institutions such as the European
Investment Bank (EIB) and the World
Bank as such counterparty and
liquidity risk is very low, although
there is potential market risk to
principal amount arising from an
adverse movement in interest rates
(no loss if these are held to maturity). 
Lending restricted to those
meeting credit rating criteria.
Assessment of credit worthiness
will be further strengthened by
the use of additional market
intelligence including credit
default swaps, sovereign support
and share price data.
Cashflow management tools will
endeavour to ensure that this
type of investment is held until
maturity to limit market risk 
Long-term
rating 
A- or
equivalent
£20m max
period of 5
years.
Page 198 of 248

Page 199

Annex C
Permitted Investments, Associated Controls, Credit Rating, Money and Time Limits 
Type of Investment Treasury Management Risks Mitigating Controls Credit Rating
Money
Limits
Time   
Limits
j. Certificates of deposits
with financial institutions 
These are short dated marketable
securities issued by financial
institutions and as such counterparty
risk is low but will exhibit higher risks
than categories (a) to (h) above. 
There is risk to value of capital loss
arising from selling ahead of maturity
if combined with an adverse
movement in interest rates. Liquidity
risk will normally be low. 
Lending will be restricted to those
counterparties meeting the credit
rating criteria with the selection
defaulting to the lowest available
credit rating to provide additional
risk control measures. 
Assessment of credit worthiness
will be further strengthened by
the use of additional market
intelligence including credit
default swaps, sovereign support
and share price data.
Long-term
rating 
A- or
equivalent
£20m Up to a
max
period of
364 days.
k. Covered Bonds  These are bonds issued by financial
institutions and guaranteed by a
group company that holds mortgage
assets. There is risk of capital loss
arising from selling ahead of maturity
if combined with an adverse
movement in interest rates. Liquidity
risk will normally be low as highly
liquid market. 
These investments are exempt from
the bail-in provisions should the
regulator determine that the bank is
failing or likely to fail.
These investments are secured
on the borrower’s assets up to a
value of 125% of the principal
amount which limits the potential
losses in the event of default. 
Process in place to monitor the
value of the cover arrangements
throughout the bond term. i.e.
value of assets providing security 
Bonds will be restricted to those
meeting credit rating criteria.
Assessment of credit worthiness
will be further strengthened by
the use of additional market
intelligence including credit
default swaps, sovereign support
and share price data.
Cashflow management tools will
endeavour to ensure that this
type of investment is held until
maturity to limit market risk. 
Long-term
rating 
A- or
equivalent
(Criteria
required for
the covered
bond.)
£20m Up to 5
years. 
BBB or
equivalent
(Criteria
required for
the covered
bond.)
£10m Up to 6
months.
Page 199 of 248

Page 200

Annex C
Permitted Investments, Associated Controls, Credit Rating, Money and Time Limits 
Type of Investment Treasury Management Risks Mitigating Controls Credit Rating
Money
Limits
Time   
Limits
l. Reverse repurchase
agreements and other
collateralised
arrangements
These are bonds issued by financial
institutions with collateral provided by
the lender to the Council by
transferring the custody and title to
bonds or other investment securities
valued at a price above par e.g.
105% of the principal amount. There
is risk of capital loss arising from
selling ahead of maturity if combined
with an adverse movement in
interest rates.  Liquidity risk will
normally be low as highly liquid
market. 
These investments are exempt from
the bail-in provisions should the
regulator determine that the bank is
failing or likely to fail.
These investments are secured
by the borrower giving the
Council custody and title to
marketable securities valued
above par that will be retained in
the event of default  
Process in place to monitor the
value of the collateral in place
throughout the bond term to
ensure adequate cover. 
Collateral arrangements will be
restricted to those meeting credit
rating criteria.
Assessment of credit worthiness
will be further strengthened by
the use of additional market
intelligence including credit
default swaps, sovereign support
and share price data.
Cashflow management tools will
endeavour to ensure that this
type of investment is held until
maturity to limit market risk 
Long-term
rating 
A- or
equivalent
(Criteria
required for
collateral
arrangement)
£20m Up to 5
years. 
BBB or
equivalent
(Criteria
required for
the collateral)
£10m Up to 6
months.
Page 200 of 248

Page 201

Annex C
Permitted Investments, Associated Controls, Credit Rating, Money and Time Limits 
Type of Investment Treasury Management Risks Mitigating Controls Credit Rating
Money
Limits
Time   
Limits
m. Investment properties These are non-service properties
which are being held pending
disposal or for a longer-term rental
income stream. These are highly
illiquid assets with high risk to value
(the potential for property prices to
fall or for rental voids). Funding for
this type of investment must be met
from revenue & balances as
borrowing to on-lend for this purpose
is prohibited per Scottish
Government Investment guidance. 
In larger investment portfolios
some small allocation of property-
based investment may
counterbalance or compliment
the wider cash portfolio. Property
holding will be re-valued regularly
and reported annually with gross
and net rental streams.
Strategy/Policy driven subject to
scrutiny by Chief Officer (Finance
and Technology).
n/a Policy
Driven 
Policy
Driven, 
n. Loans to third parties
including soft loans
These are service investments either
at market rates of interest or below
market rates (soft loans). These
types of investments may exhibit
credit risk and are likely to be highly
illiquid. Funding for this type of
investment must be met from
revenue & balances as borrowing to
on-lend for this purpose is prohibited
per Scottish Government Investment
guidance.
Prior to awarding loans to a third
party the Service Strategy/Policy
decision to award this type of
loan/loans must be subject to
scrutiny and approval by the
Chief Officer (Finance and
Technology). Full detail of the
service rationale behind awarding
the loan and the likelihood of
partial or full default must be
assessed.  
n/a Policy
Driven 
Policy
Driven, 
o. Loans to a local authority
company
These are service investments either
at market rates of interest or below
market rates (soft loans). These
types of investments may exhibit
credit risk and are likely to be highly
illiquid. Funding for this type of
investment must be met from
revenue & balances as borrowing to
on-lend for this purpose is prohibited
per Scottish Government Investment
guidance.
Prior to awarding loans to a local
authority company, the Service
Strategy/Policy decision to award
this type of loan/loans must be
subject to scrutiny and approval
by the Chief Officer (Finance and
Technology). Full detail of the
service rationale behind awarding
the loan and the likelihood of
partial or full default must be
assessed.
n/a Policy
Driven 
Policy
Driven, 
Page 201 of 248

Page 202

Annex C
Permitted Investments, Associated Controls, Credit Rating, Money and Time Limits 
Type of Investment Treasury Management Risks Mitigating Controls Credit Rating
Money
Limits
Time   
Limits
p. Shareholdings in a local
authority company
These are service investments which
may exhibit market risk and are likely
to be highly illiquid. Funding for this
type of investment must be met from
revenue & balances as borrowing to
on-lend for this purpose is prohibited
per Scottish Government Investment
guidance.
Each equity investment in a local
authority company requires
member approval and each
application will be supported by
the service rationale behind the
investment and the likelihood of
loss. 
Service Strategy/Policy driven
subject to scrutiny by Chief
Officer (Finance and
Technology). 
n/a Policy
Driven 
Policy
Driven 
q. Non-local authority
shareholdings
These are non-service investments
which may exhibit market risk, be
only considered for longer term
investments and will be likely to be
liquid. Funding for this type of
investment must be met from
revenue & balances as borrowing to
on-lend for this purpose is prohibited
per Scottish Government Investment
guidance.
Any non-service equity
investment will require separate
Member approval, and each
application will be supported by
the service rationale behind the
investment and the likelihood of
loss.
Service Strategy/Policy driven
subject to scrutiny by Chief
Officer (Finance and Technology) 
n/a Policy
Driven 
Policy
Driven 
Page 202 of 248

Page 203

Annex C
Permitted Investments, Associated Controls, Credit Rating, Money and Time Limits 
Type of Investment Treasury Management Risks Mitigating Controls Credit Rating
Money
Limits
Time   
Limits
r. Subordinated debt in
projects delivered via
‘Hubco/DBFM’ model
The ‘Hubco/DBFM’ delivery model
fails to meet its’ contractual
obligations resulting in failure to
repay the principal sum invested.
The cash forming part of the
Council’s reserves and balances is
required during the term of the
investment as the type of investment
is highly illiquid.
Fluctuations in the levels of interest
rates create an unexpected or
unbudgeted burden on the Council’s
finances against which the Council
has failed to protect itself adequately.
The Council must assess the
merits of each individual
subordinated debt investment
opportunity via the ‘Hubco/DBFM’
model prior to investing, carrying
out a full risk/benefit analysis. 
Employ efficient cashflow
management and forecasting
tools including annual balance
sheet analysis. 
Set a cap on the level of long-
term investments of this nature
i.e. to avoid cash reserves being
fully extinguished resulting in
future non-compliance with
‘borrowing to on lend’ restrictions.
Implement Long term Financial
Plans which are robust including
the setting of contingencies and
cash backed reserves at levels to
leave prudent headroom to cater
for long term cash commitments.
Where possible consider selling
subordinated debt to a secondary
market provider.
For investments in subordinated
debt for projects delivered via the
‘Hubco’ model the rate of return
is fixed over the term of the
investment and in normal
circumstances will not vary.
n/a £1.5m
per
project
Up to 30
years
Page 203 of 248

Page 204

Annex D
Interest Rate Forecast March 2026 until December 2028 (Source: Arlingclose Ltd December 2025) 
*Official Bank rate: (also called the Bank of England base rate or BOEBR) is the interest rate that the Bank of England charges Banks for secured
overnight lending. 
**MM:  the short term readily available from banks and building societies and similar financial organisations 
***PWLB: Public Works Loan Board 
Central Forecast March June Sept Dec March June Sept Dec March June Sept Dec
Official Bank  Rate* 3.50% 3.25% 3.25% 3.25% 3.25% 3.25% 3.25% 3.25% 3.25% 3.25% 3.25% 3.25%
3-mth MM Rate** 3.55% 3.30% 3.30% 3.30% 3.30% 3.30% 3.30% 3.30% 3.30% 3.35% 3.35% 3.35%
1-yr LIBID
5-yr PWLB*** 4.65% 4.60% 4.55% 4.55% 4.55% 4.55% 4.55% 4.55% 4.55% 4.60% 4.60% 4.60%
10-yr PWLB 5.20% 5.15% 5.10% 5.10% 5.10% 5.10% 5.10% 5.10% 5.10% 5.15% 5.15% 5.15%
20-yr PWLB 5.80% 5.75% 5.70% 5.70% 5.70% 5.70% 5.70% 5.70% 5.70% 5.75% 5.75% 5.75%
50-yr PWLB 5.45% 5.40% 5.25% 5.40% 5.40% 5.40% 5.40% 5.40% 5.40% 5.45% 5.45% 5.45%
2026 2027 2028
Page 204 of 248

Page 205

Annex E 
SENSITIVITY ANALYSIS OF PRUDENTIAL INDICATORS: AFFORDABILITY 2026/27 to 2030/31 
(i) a plus or minus 10% change in the capital financing requirement i.e the level of borrowing undertaken to retain average investment
balances and under borrowing at prudent levels
Prudential Indicators : Affordability CFR
Movement 26/27 27/28 28/29 29/30 30/31
£m £m £m £m £m
Total Composite Capital Financing Costs +10% 62.41 71.55 84.83 98.31 101.71
No Change 62.04 70.40 82.65 95.01 98.16
-10% 61.67 69.26 80.46 91.69 94.60
Total HRA Capital Financing Costs +10% 46.21 54.49 65.62 74.20 82.93
No Change 45.91 53.37 63.56 71.40 79.30
-10% 45.61 52.25 61.49 68.59 75.67
General Fund : Ratio of financing costs to net revenue stream +10% 5.43% 6.18% 7.28% 8.41% 8.64%
No Change 5.40% 6.08% 7.10% 8.12% 8.34%
-10% 5.37% 5.98% 6.91% 7.84% 8.04%
HRA : Ratio of financing costs to net revenue stream +10% 25.04% 28.01% 31.94% 34.44% 36.55%
No Change 24.87% 27.44% 30.93% 33.14% 34.95%
-10% 24.71% 26.86% 29.93% 31.83% 33.35%
Page 205 of 248

Page 206

Annex E 
SENSITIVITY ANALYSIS OF PRUDENTIAL INDICATORS: AFFORDABILITY 2026/27 to 2030/31 
(ii) a plus or minus 50bps change in the interest rates achievable for new long-term borrowing i.e. 1/2 per cent movement
Prudential Indicators : Affordability Interest Rate
Movement 26/27 27/28 28/29 29/30 30/31
£m £m £m £m £m
Total Composite Capital Financing Costs +50bps 63.29 72.11 85.30 98.47 101.97
No Change 62.04 70.40 82.65 95.01 98.16
-50bps 60.78 68.70 80.01 91.56 94.37
Total HRA Capital Financing Costs +50bps 46.93 54.80 65.78 74.18 82.60
No Change 45.91 53.37 63.56 71.40 79.30
-50bps 44.89 51.95 61.34 68.63 76.03
General Fund : Ratio of financing costs to net revenue stream +50bps 5.51% 6.23% 7.32% 8.42% 8.67%
No Change 5.40% 6.08% 7.10% 8.12% 8.34%
-50bps 5.29% 5.93% 6.87% 7.83% 8.02%
HRA : Ratio of financing costs to net revenue stream +50bps 25.43% 28.17% 32.01% 34.43% 36.40%
No Change 24.87% 27.44% 30.93% 33.14% 34.95%
-50bps 24.32% 26.70% 29.86% 31.85% 33.51%
Page 206 of 248

Page 207

Annex E 
SENSITIVITY ANALYSIS OF PRUDENTIAL INDICATORS: AFFORDABILITY 2026/27 to 2030/31 
(iii)
Prudential Indicators : Affordability Movement in
Net Revenue
Steam 26/27 27/28 28/29 29/30 30/31
General Fund : Ratio of financing costs to net revenue stream +10% 4.91% 5.53% 6.45% 7.39% 7.58%
No Change 5.40% 6.08% 7.10% 8.12% 8.34%
-10% 6.00% 6.75% 7.88% 9.03% 9.27%
HRA : Ratio of financing costs to net revenue stream +10% 22.61% 24.94% 28.12% 30.12% 31.77%
No Change 24.87% 27.44% 30.93% 33.14% 34.95%
-10% 27.64% 30.49% 34.37% 36.82% 38.83%
a plus or minus 10% change in the net revenue stream used to calculate the proportion of financing costs to net revenue
Page 207 of 248

Page 208

Annex F
LOANS FUND REPAYMENT SCHEDULE   
Loans Fund Repayments Schedules
Composite
Estimated
Loans Fund
Pool Open
Balance
HRA
Estimated
Loans Fund
Pool Open
Balance Total
£m £m £m
Estimated Loans Fund Pool Open Balance 765.4 628.7 1,394.2
Estimated New Advances 26/27 114.4 122.0 236.4
Estimated New Advances 27/28 128.3 113.9 242.2
Estimated New Advances 28/29 228.5 150.4 378.9
Estimated New Advances 29/30 34.4 121.9 156.3
Estimated New Advances 30/31 17.2 131.7 148.9
Total Debt Repayments Due 1,288.3 1,268.6 2,556.8
Scheduled Debt Amortisation Composite HRA Total
£m £m £m
Within 1 year (13.5) (15.6) (29.1)
Within 2 to 5 years (74.5) (81.4) (155.9)
within 5  to 10 years (127.3) (147.8) (275.1)
within 10 to 15 years (159.7) (178.7) (338.4)
within 15 to 20 years (188.9) (177.3) (366.2)
within 20 to 25 years (199.4) (191.3) (390.7)
within 25 to 30 years (168.8) (200.5) (369.3)
within 30 to 35 years (163.5) (159.9) (323.4)
within 35 to 40 years (138.6) (80.1) (218.7)
within 40 to 45 years (54.1) (35.9) (90.0)
within 45 to 50 years 0.0 0.0 0.0
(1,288.3) (1,268.6) (2,556.8)
Page 208 of 248

Page 209

North Lanarkshire Council
Report
Finance and Resource Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref:  GT/VR Date 04/03/26 
Future of Council Tax in Scotland: Consultation 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 07583 010692 
Executive Summary
The Scottish Government launched its consultation on the future of Council Tax in Scotland
in 27 October 2025. The consultation aimed to seek views on how the Council Tax system
could be made fairer and more up to date.   
The consultation also explores different models in relation to the revaluation of properties,
adjusting tax bands and introducing protections to help households manage any financial
impact. 
The consultation had to be considered and submitted outwith committee cycles so this
report is presented for information and outlines the response submitted on behalf of the
Council by the deadline of 30 January 2026.   
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledges the submission of the Council’s response to the Scottish
Government’s consultation on the Future of Council Tax in Scotland as set out in
Appendix 1.    
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (25) Ensure intelligent use of data and information to support
fully evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 16
Page 209 of 248

Page 210

1. Background 
1.1. Council Tax reform in Scotland has been the focus of analysis and debate over the
past two decades. There have been numerous reviews, commissions and working
groups examining how the system could be improved.  However, efforts have
consistently identified the need for change and highlighted a range of potential
approaches to deliver a fairer and more sustainable model for the future.   
1.2. On 11 February 2025, the Scottish Government and COSLA launched a Programme
of Engagement to support their shared commitment to long term Council Tax reform. 
A consultation was launched, setting out several possible models for improving the
Council Tax system and requests views on how the system could be made fairer, more
up to date, and easier to understand, while still providing the funding needed for
essential local services. 
1.3. The consultation closed on 30 January, with the feedback gathered, along with wider
public engagement throughout 2025, will help inform future decisions that the Scottish
Parliament will consider on the future of Council Tax. 
2. Report 
2.1. The supporting information and consultation document have been reviewed by
Finance & Technology. The response submitted prior to the deadline of 30 January
2026 is set out in Appendix 1. 
2.2. The service is satisfied that the response considers the impact on both the Council
and residents. 
3. Measures of success 
3.1  n/a   
4. Supporting documentation 
4.1  Appendix 1  Submitted NLC Consultation Response   
Greg Telfer
Chief Officer (Finance and Technology) 
Page 210 of 248

Page 211

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 211 of 248

Page 212

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 212 of 248

Page 213

Consultation: The Future of Council Tax in Scotland
Respondent Information Form 
Please Note this form must be completed and returned with your response.
To find out how we handle your personal data, please see our privacy policy - Privacy - gov.scot 
Are you responding as an individual or an organisation?   
Individual 
Organisation
Full name or organisation’s name 
Phone number 
Address 
Postcode 
Email Address 
The Scottish Government would like your 
permission to publish your consultation 
response. Please indicate your publishing 
preference: 
Publish response with name 
Publish response only (without name) 
Do not publish response
North Lanarkshire Council 
ML1 1AB
Civic Centre,
Windmillhill Street
Motherewell 
Information for organisations:
The option 'Publish response only (without
name)’ is available for individual respondents
only. If this option is selected, the organisation
name will still be published. 
If you choose the option 'Do not publish
response', your organisation name may still be
listed as having responded to the consultation
in, for example, the analysis report. 
Page 213 of 248

Page 214

We will share your response internally with other Scottish Government policy teams who may be
addressing the issues you discuss. They may wish to contact you again in the future, but we require
your permission to do so. Are you content for Scottish Government to contact you again in relation
to this consultation exercise? 
Yes 
No
About You Questions 
1. About you Question 1 
[For individual respondents] Please tell us which local authority area(s) you live in 
Local Authority Area(s):
[For organisational respondents] Please tell us which local authority area(s) your organisation
operates in 
Local Authority Area(s): North Lanarkshire 
2. About you Question 2 
If you pay council tax, please indicate which council tax band(s) apply to the property (or properties)
for which you pay council tax: 
Band A 
Band B 
Band C 
Band D 
Band E 
Band F 
Band G 
Band H 
I don’t pay council tax 
I don’t know 
Page 214 of 248

Page 215

Questions for Consultation 
1. Do you think the current council tax system in Scotland needs to be reformed? 
x Yes
☐ No
☐ Don’t know 
2. Do you think property values used to calculate council tax should be updated to reflect current
market values, instead of using 1991 values (i.e. should there be a revaluation of every Property
in Scotland)? 
x Yes
☐ No
☐ Don’t know 
It should be noted that the cost to revalue current market values for Council Tax base will result
in significant additional costs.  Consideration should be given to how valuations would be carried
out and whether additional funding would be provided to support this. 
3. How often do you think property values should be reviewed and updated for council tax
purposes? 
☐ Every 3 years
☐ Every 5 years
x   Every 7 years
☐ Every 10 years
☐ Other, please specify [50 words maximum]
☐ Don’t Know 
Although there is some sense in mirroring the triennial frequency for revaluation of non
domestic properties, the more significant scale of impact of revaluation of residential properties
would render such regular revaluations impractical and costly. 
4. Following a revaluation, do you think council tax band property value thresholds should be set at
a national level or vary by council area? 
x Thresholds should be set nationally to be the same across all council areas
☐ Thresholds should vary by council area based on local housing markets
☐ Don’t know
Page 215 of 248

Page 216

Council Tax bands thresholds and the proportional charges between bands should continue to
be fixed nationally and identical for all councils.  This will ensure fairness and consistency,
continues to be a simple and transparent system and avoids issues with boundaries between LA
areas.   
5. Which of the following is most important to you in the design of council tax bands? 
☐ Ensuring tax rises between bands are gradual and predictable (differentiation)
x Ensuring households in higher-value homes contribute more (progressivity)
☐ Don’t know
☐ Other, please specify [50 words maximum] 
A progressive approach should be adopted, ensuring that those with a greater ability to pay
contribute proportionately more. This supports a fairer distribution of the overall tax burden while
generating the revenue required to fund essential local services, without placing an undue impact
on lower income households. 
6. Which of the potential council tax systems do you most support? 
☐ Revaluation with 8 existing bands
☐ Revalued 12-band (differentiated) system
x Revalued 12-band (progressive) system
☐ Revalued 14-band system
☐ The current council tax system 
☐ Don’t know 
This option offers a more progressive model in which households occupying higher value
properties contribute a greater share.  This creates a fairer and more proportionate system with
taxation more closely aligned with the ability to pay while offering protection for lower income
households. 
7. Which of the potential council tax systems do you least support? 
☐ Revaluation with 8 existing bands
☐ Revalued 12-band (differentiated) system
☐ Revalued 12-band (progressive) system
☐ Revalued 14-band system
x The current council tax system 
☐ Don’t know
Page 216 of 248

Page 217

The current Council Tax system is outdated and regressive. While revaluing properties within the
existing eight band structure would update the valuation base, it would not resolve the underlying
issues of fairness or address the issues created by the broad and uneven banding framework. 
8. Do you support the establishment of a transitional relief scheme to limit how much a
household’s council tax bill can increase each year following reform? 
x Yes
☐ No
☐ Don’t know 
Transitional relief should be introduced to help manage the financial impact of reforms on households,
ensuring that any changes to Council Tax liability are phased in gradually and affordability is protected
during the transition period. However, such a scheme would need to be simple to administer and
lessons learned from transitional reliefs available following non-domestic property revaluations. 
9. Which transitional relief scheme would you prefer? 
☐ Scheme 1: Cap increases at 10% or £300 per year
☐ Scheme 2: Cap increases at 25% or £600 per year
x Other, please specify [50 words maximum]
☐ Don’t know 
Transitional relief should be given to those where there is cost pressure as a result of reform however
where a reduction is required that should be immediate.  Increases should be capped at one band per
annum. 
10. Do you support the establishment of a council tax deferral scheme for homeowners? 
x Yes
☐ No
☐ Don’t know 
A deferral scheme would offer a safety net for households who are asset-rich but income-constrained,
allowing them to delay payment until a change in circumstances (such as selling the property). This
ensures people can stay in their homes without facing immediate financial pressure, while councils
still ultimately recover the tax owed. 
11. In your view, who should be eligible to receive support from a council tax deferral scheme?
[Select as many as you think should apply]
Page 217 of 248

Page 218

x Pensioners (over state pension age)
☐ Disabled people
☐ Households with children
x Households experiencing financial hardship
☐ Other, please specify [50 words maximum]
☐ Don’t know 
12. Should households who defer payment pay interest on the amount deferred? 
x  Yes
☐ No 
☐ Don’t know 
The interest should cover the costs of administering any scheme. An interest free arrangement
would come at a cost to Councils and remove any incentive for early payment. 
13. Do you think the Council Tax Reduction scheme should be expanded to support more
households following any reform? 
x Yes
☐ No 
☐ Don’t know 
14. Which changes to the Council Tax Reduction scheme would you support? [Select as many as you
think should apply] 
☐ Broaden eligibility criteria for CTRS to include low-income households where the property
moves into a higher band due to council tax system changes 
☐ Change CTR so support is withdrawn more gradually as rising incomes move individuals out of
eligibility
☐ No changes needed
x Other, please specify [50 words maximum]
☐ Don’t know 
Council Tax Reduction (CTR) scheme should be adjusted so that support tapers away more steadily
as household incomes rise. A smoother withdrawal of assistance would help prevent people from
facing sudden increases in their council tax bill as their financial situation improves. 
To strengthen the safety net for residents who are finding it difficult to meet their council tax
obligations, a number of changes could be introduced, including:
• A lower taper, ensuring that support reduces at a gentler rate.
• Higher earnings disregards, enabling people to retain more of their income before it affects
their entitlement.
Page 218 of 248

Page 219

• A higher capital threshold, allowing those with small savings to continue to receive help.
Although these improvements would increase the overall cost of the CTR scheme, they could be
balanced within a wider package of reforms designed to keep the overall system broadly
cost-neutral.   
15. Do you have any information you wish to share that has not already been discussed in the paper
on the impact of council tax reform on any of the following: 
- Groups who share protected characteristics 
- Island Communities 
- Businesses or organisations in the public, private or third sector 
- Your local area
Please provide details, making reference to the type of impact to which your comments relate. [free
text, 300 words maximum] 
Impact on Local Authority and residents 
Ensuring local government funding remains stable throughout reform is essential, as the Council
relies on this income to deliver core services and manage long term financial planning.  NLC use
ringfenced council tax increases to support capital investment, any impact on the Council Tax base
could adversely affect both revenue and capital planning. A new system must therefore be
supported by clear guidance, adequate transition funding, and a phased approach that avoids
sudden revenue fluctuations.  The reform should not impact on the resources available to any
individual Council.
Alongside this, strong communication with residents will be crucial to maintain public confidence.
People need simple, accessible information about how the new system works, why changes are
being made, and what the impact will be on their household, helping to minimise confusion and
support a smooth transition. 
16. Please provide any other comments or views on the consultation themes or council tax reform
that you have not been able to share above. [free text, 300 words maximum] 
North Lanarkshire Council supports meaningful reform of the Council Tax system, including a
comprehensive revaluation of properties and wider system improvements. Modernisation is
essential to ensure the system is fair, up-to-date, and more progressive, with contributions more
closely aligned to households’ ability to pay. 
Changes to Council Tax bands would have implications for water and sewerage costs. Depending
on the approach taken by Scottish Water this could increase the impact of reform on some
households. 
Page 219 of 248

Page 220

Page 220 of 248

Page 221

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref       PostalCC/FT/Jan25 Date 04/03/26 
Postal Contract Variation 
From:  Carolynne Coole, Interim Chief Officer (Strategy and Engagement)
Email:  CoolemillerC@northlan.gov.uk              Telephone: 07583 036009 
Executive Summary
In accordance with the Council’s Financial Regulations, this report notifies the Committee
of the postal services contract which commenced on 1 January 2024 and is due to conclude
on 30 June 2026, where the expenditure levels are anticipated to exceed the contract
award levels by greater than 5% or £25,000. 
Prior to the procurement exercise for this contract, services had identified known business
as usual postal activity to ascertain projected contract costs. However, since the postal
contract has been in place, a number of specific activities which were not previously
anticipated at the time of procurement, has resulted in additional expenditure. 
These activities, alongside a significant rise in postage costs, have contributed to additional
postal spend to those previously outlined as in scope for the Hybrid, Planned/Bulk Mail
contract. 
The anticipated total spend to the contract end in June 2026 is expected to be in the region
of £2,431,755.85, which is higher than the original contract value. Although expenditure
through the contract is higher than anticipated, all costs are met through existing service
budgets.
Recommendations
It is recommended that the Finance and Resources Committee: 
(1)         Acknowledge the content of this report and the accompanying appendix. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 17
Page 221 of 248

Page 222

1. Background 
1.1 The Council’s General Contract Standing Orders (the ‘GCSOs’) outline financial
approval thresholds for contracts for goods, works and services. This report details
services (postal contract) where funding has previously been approved in line with
GCSO’s. 11.3 
1.2 The Council’s Financial Regulation, (13.4) Significant Variations, details the threshold
of variances where reporting is required. 
1.3 The Chief Officer of Strategy and Engagement is required to notify Committee on a
periodic basis of any such contracts containing variations as identified by the criteria in
1.1 above. 
2. Report 
2.1 The Council’s Financial Regulations state, any variations where the outturn/expected
costs exceed the tendered contract price by the higher of £25,000 or 5%, or where the
outputs/outcomes achieved by the expenditure differ from those originally envisaged,
shall be reported by the Chief Officer to the relevant Spending Committee at the earliest
opportunity. 
2.2  The Council utilised the Scottish Government’s National Collaborative Framework for
Postal Services (“National Framework”) as the route to market to establish contracts
for postal services. Following a full procurement exercise in 2023, the Council approved
the award of call-off contracts for the provision of Postal Services (the “Contracts”) to: 
•  Royal Mail Group Ltd – for Physical Mail 
• Critiqom (trading as Adare SEC and now as Mail Metrics) – for Hybrid, Scheduled 
Bulk/Planned (Print and Post) 
2.3 A robust review of postal service usage was carried out by an internal usage
intelligence group prior to the procurement exercise to determine average expected
expenditure and forecasted demand, and the switch to a new supplier for Hybrid,
Planned/Bulk mail (print and post) contract was designed to deliver a net saving of
approximately £0.064m in the first year of contract for known business as usual
requirements. 
2.4 The Hybrid, Planned/Bulk Mail contract was established for a period of 30 months at
value of £1,678,511, with a projected average monthly cost of £55,950 for known
business as usual ("BAU") requirements. 
2.5 Contracts awarded by the Chief Officer of Strategy and Engagement for services
undertaken in the period 1 January 2024 until 31 December 2025 (the contract is due
to conclude on 30 June 2026), containing variations are detailed in Appendix 1 below. 
2.6  Although the user intelligence group identified known business as usual activity, a
number of unknown activities which were not previously anticipated at the time of
procurement, has resulted in additional expenditure. This includes: 
• The introduction of the Garden Bin Permit Scheme in 2025 which was agreed at a
meeting of the Environment and Climate Change Committee on 30 October 2024,
and was therefore regarded as an unforeseen cost that wasn’t built into the known
business activity at the time of the procurement exercise. Including initial cost
outlays for one-off items such as bin stickers and letters which were posted, the
Page 222 of 248

Page 223

total cost was £182,387.42 with additional forecast spend for a similar exercise in
2026. It should be noted that the Garden Bin Permit Scheme has also generated
income of £1,751,120 to date. 
• At the Communities Committee on 3 February 2025, approval was given to hold a
half marathon event in the Motherwell area on 25 August 2025 and was therefore
not a planned activity in terms of the forecasted postal demand to letter residents
at a cost of £23,607. 
2.7 Typically a contingency is designed into the contract to address unknown quantities or
abnormalities but as outlined in 2.5, a number of specific activities have contributed to
additional postal spend to those previously outlined as in scope for the Hybrid,
Planned/Bulk Mail contract. 
2.8 In addition, as agreed within the Framework as standard, the contractor applied new
rates from 1 April 2025 following Royal Mail increasing prices by an average 14.18%,
which has contributed to the increased spend. There are also inflationary rises that
should be considered, including the increase in the cost of paper production and supply,
which have impacted on costs. 
2.9 Including the spend to date (£1,649,536.43) and the projected spend until the end of
the contract on 30 June 2026, we anticipate total spend to be in the region of
£2,431,755.85, which is higher than the original contract value, and is in the main, due
to the reasons outlined in 2.6 and 2.8. Although expenditure through the contract is
higher than anticipated, all costs are met through existing service budgets. 
3. Measures of success 
3.1 Contracts support the delivery of Council objectives and service priorities. 
3.2 Contracts containing variances are managed by the Council and are compliant with
Financial Regulations, GCSOs and procurement legislation. 
3.3 The Council’s Contract Register, and budgetary monitoring systems are kept updated
by services and management information is comprehensive and accurate. 
3.4  Best Value is both demonstrable and achieved.   
4. Supporting documentation 
4.1  Appendix 1 Summary of postal contract spend containing variations. 
Carolynne Coole
Interim Chief Officer (Strategy and Engagement) 
Page 223 of 248

Page 224

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
As outlined in paragraph 2.9 and in Appendix 1.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 224 of 248

Page 225

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Contract management procedures may be susceptible to financial claims and legal
challenge if they are not discharged in accordance with Contract Conditions,
Financial Regulations, GCSO’s and procurement legislation. 
Further business user insight involving all services will be required ahead of the
next procurement exercise to ensure better forecasting.  
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.  
Page 225 of 248

Page 226

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 226 of 248

Page 227

Appendix 1 
Summary of contract variation 
Contract Title Estimated Outturn Tender Amount Variation Reason
Postal Services 
Lot 2 - Hybrid,
Planned/Bulk Mail
£2,431,755.85 £1,678,511 Call-off from Scottish
Government Postal
Services Framework for a
period of 30 Months at
value of £1,678,511. Due to
a number of reasons
including unplanned spend
on the garden refuse permit
programme, the half
marathon and the
inflationary rises including
an increase in postage
costs. 
Page 227 of 248

Page 228

Page 228 of 248

Page 229

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes ☐ No
Ref: NLC-CPT-25-084 Date: 04 March 2026 
Contract Award for Provision of LAN / SAN Hardware Supply &
Maintenance 2026-2029 
From  Greg Telfer, Chief Officer (Finance and Technology) 
E-mail TelferG@northlan.gov.uk Telephone: 07583 010692 
Executive Summary 
In accordance with the council’s General Contract Standing Orders (GCSOs), the Committee is
asked to approve the award of a contract for Provision of LAN / SAN Hardware Supply &
Maintenance (the ‘Agreement’) following the undertaking of a procurement procedure as detailed
within this report below. 
Recommendations 
It is recommended that the Finance and Resources Committee: 
(1) Approves the award of the Agreement to Virgin Media Business Limited (the “Contractor”) at 
the maximum value of Six Million Seven Hundred Thousand Pounds Sterling (£7,994,000) 
exclusive of VAT across the Agreements full term which is made up of a period of 36 months 
that is anticipated to commence on 01 April 2026. 
The Plan for North Lanarkshire 
Priority Improve North Lanarkshire's resource base 
Ambition Statement (18) Ensure our digital transformation is responsive to all people's needs
and enable access to the services they need 
Programme of Work Digital North Lanarkshire 
1. Background 
1.1. The purpose of this Agreement is for the Council to purchase and maintain network products,
servers, storage and relevant services. The network products can be hardware or software
based and include the following: 
• Provision of LAN/WLAN hardware maintenance and support;
• Switches;
• Firewalls;
• Wireless LAN controllers;
• Monitoring tools;
Item 18
Page 229 of 248

Page 230

• Servers & Storage hardware;
• Support training of in-house staff accredited (install/basic repair);
• Cisco Enterprise Agreement licenses;
• Security EA licenses; and
• Networking Infrastructure EA (Switching)
• Consultancy 
1.2. The agreement included the continued support and maintenance of the Council’s existing
networking hardware. 
1.3. The Council is looking to procure ad-hoc hardware throughout the lifetime of the contract
through a capital investment which has been approved within Council budgets. The Council
has reviewed the current estate, taking on board the end-of-life support dates, to project the
anticipated volumes for hardware procurement. 
1.4. The Council aims to implement a standardised switching model tailored to building size and
functional requirements. 
Small buildings (e.g., nurseries, local libraries)
Medium buildings (e.g., primary schools, social work facilities)
Large buildings (e.g., high schools, corporate headquarters) 
1.5. Our vision is to create a smarter, more agile working environment where wireless connectivity
is prioritised to enhance flexibility and user experience. However, we recognize that a robust
and scalable switching infrastructure is fundamental to supporting this approach and ensuring
reliable performance across all sites. 
1.6 The requirements within the Agreement are currently under contract with Virgin Media
Business Limited. This arrangement is due to expire on 31 March 2026 with the Agreement
detailed within this report due to supersede it.Under the existing arrangement, a significant
refresh of networking hardware was undertaken to replace legacy equipment that was no
longer supported. The forthcoming agreement maintains this approach by incorporating a
hardware call-off provision, delivering an end-to-end service for supply, support, and
maintenance. 
1.7 To enable appropriate development and execution of the procedure required to form the
Agreement, a panel of technical and procurement representatives (the “User Intelligence
Group (UIG)”) was formed. 
1.8  The UIG were responsible for developing the required internal contract strategy (the “Contract
Strategy“) for the Agreement. The Contract Strategy sets out the parameters and approaches
the council would apply within the procurement, tendering, contracting and end of life stages
of the Agreement following appropriate analysis, research and investigation to ensure the
council achieves maximum benefit where possible. In accordance with GCSO 4.4, the
Contract Strategy for the Agreement was approved on 20 November 2025. 
2. Report 
2.1 The procurement procedure was undertaken as a “Mini Competition” via the Crown
Commercial Services, Technology Products & Associated Services 2, Lot 1 Hardware and
Software and Associated Services (RM6098). A Mini Competition is a streamlined
competitive procurement procedure where an overarching framework agreement is already
in situ thus allowing the council access to companies that have already went through a full
competitive procurement procedure to gain appointment to the overarching framework
agreement. Accordingly, a Mini Competition enables the Council to award from the
overarching framework agreement in a more efficient manner whilst enabling competition.  Page 230 of 248

Page 231

2.2 Based on the evaluation criteria and scoring methodology set out in the procurement
procedure, an evaluation of tenders received was completed by members identified by the
UIG as having the technical knowledge and experience to evaluate tenders in a professional
and fair manner. 
2.3 Following completion of the procurement procedure in accordance with the overarching
framework agreement, the recommended Contractor has been evaluated as submitting the
most economically advantageous tender. 
2.4 The tender submitted by Virgin Media Business Ltd was the only bid received and has been
evaluated as representing the most economically advantageous tender for this Contract. 
2.5 In order to demonstrate value has been achieved from this award, a further benchmarking
exercise of the hardware component pricing was carried out as part of the evaluation process
whereby additional pricing for the hardware items were obtained via the Purchasing Platform
Catalogue available from Crown Commercial Services, Technology Products & Associated
Services 2, Lot 8 Technology Catalogue (RM6098). 
2.6 Appendix 1 provides a summary of the procurement procedure undertaken including the key
considerations and outcomes. 
Financial / Budget Consideration 
2.7 The pre-tender wholelife estimate budget for the Agreement was £6,700,000. The costs
associated with delivery of the Agreement will be contained within a mixed Capital and
Revenue budget for the infrastructure team within Finance and Technology. It is expected
that £6,000,000 capital budget will be allocated to this contract over the contract lifetime to
invest and enhance the Council’s networking hardware estate. Existing Revenue budget
associated with the maintenance of hardware will continue into this contract and provision
has been made within the Council’s Medium Term Financial Plan to ensure ongoing support
for new hardware license costs across the next 3 years. 
Price Stability 
2.8 The maintenance pricing is fixed for the contract term. 
2.9 The supply of Hardware from the call off agreement will fluctuate according to dollar
exchange rate. However, initial pricing will be fixed for 30 days from quotation and contract
management will be applied to continually benchmark the pricing throughout the lifetime of
the contract. 
2.10 The benchmarking exercise discussed in section 2.6 and engagement with Cisco confirmed
that the council received on average a 49% discount within the response. The exercise
carried out against pricing available via the RM6068 Technology Products and Associated
Services catalogue demonstrated Virgin Media Business Ltd tender offered best value.
Further details can be seen in Appendix 2. 
Community Benefits 
2.11 The council is committed to maximising the delivery of community benefits. The procurement
included a community benefit requirement, this approach is designed to deliver local
community benefits where possible. 
2.12 Within their tender, the recommended Contractor committed to deliver community benefits
as detailed within Appendix 1 of this report: 
Page 231 of 248

Page 232

2.13 The community benefits committed as part of the Agreement does not include the creation of
jobs or apprenticeships. 
Fair Work First and Payment of the Living Wage  
2.14 Within their tender submission to obtain appointment to the overarching framework
agreement , the recommended Contractor intimated that they would commit to key areas of
the Scottish Governments “Fair Work First” initiative including: 
• Payment of the Real Living Wage 
• Commitment to not utilise zero-hour contracts
• Supply chain transparency via Electronic Watch affiliation ensuring ethical sourcing and
modern slavery risk mitigation 
2.15 Further information on the Living Wage status of the recommended Contractor is detailed in
Appendix 1 
Contract Management 
2.16 Officers from the Infrastructure team within Finance and Technology will be responsible for
managing the Agreement which will be undertaken in accordance with the contract and
supplier management conditions applied within the Agreement. 
3. Measures of success 
3.1 The Agreement will deliver the following outcomes; 
• Best Value will be demonstrated as outlined in Appendix 1; 
• Appointment of a single supplier to support and maintain the council’s LAN/WLAN, 
storage and servers and establish a straightforward approach to request requirements 
as and when required. 
• Consolidation of equipment reducing agreement burden in terms numbers of equipment 
to maintain. Supplier accredited trainer of manufacturer equipment who are supporting 
delivery of training to in-house staff to deliver installation. 
• Social Value delivery as described within Appendix 1. 
• Supply chain transparency via Electronic Watch affiliation ensuring ethical sourcing and 
modern slavery risk mitigation 
4. Supporting documents 
4.1 Appendix 1 Summary of Procurement Procedure
4.2 Appendix 2 Supporting Benchmarking Exercise 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 232 of 248

Page 233

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Impacting capital and revenue budgets. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People Resources? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒    
Yes ☐ No ☒  
If Yes, please provide a brief summary of the impact? 
All procurement procedures will have potential legal implications however throughout this
Agreement, compliance with the councils General Contract Standing Orders and the
relevant procurement regulations has been maintained with advice from colleagues in
Corporate Procurement and Legal Services sought as and when required. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☐ No ☒  
Page 233 of 248

Page 234

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
Please refer to corporate and service risk registers contained within Figtree. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from the
United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out? 
Yes ☐ No ☒ 
Page 234 of 248

Page 235

Appendix 1 – Summary of Procurement Procedure 
Overview
Reference NLC-CPT-25-084
Title Provision of LAN / SAN Hardware Supply & Maintenance 2026-2029
Classification Supplies
Responsible Chief
Officer and Position Greg Telfer, Chief Officer (Finance & Technology) 
Competition
Governance by Value Overarching Framework Agreement's terms and condition in accordance with the Councils General Contract
Standing Orders
Route to Market Mini Competition from a Third-Party Framework Agreement
“Framework
Agreement “Title, Ref
and Lot Info
Crown Commercial Services, Technology Products & Associated Service 2, Lot 1 Hardware and Software and
Associated Services (RM6098)
Interest No. of Lot / Framework
Agreement Contractor 16 Date Invitation to Tender
Package Published 10 December 2025
Tenders Received
Total No. of Tenders
Received 1 No. of Tenders From
SME’s 0
No. Tenders from NLC
Based Businesses 0 No. of Tenders from
Supported Businesses 0
Reasons for Single
Tender Response
16 invited to participate in this mini-competition. However, only one return was received from Virgin Media Business
Limited. Further benchmarking was conducted to support best value considerations – see Appendix 2. 
Interest was expressed from other bidders during the procurement. Unfortunately, these bidders ultimately decided
not to participate citing the following reasons: 
• Unable to work with partner (Cisco)
• On this occasion we have opted to decline due to internal considerations 
• Not bidding. 
Page 235 of 248

Page 236

Award Criteria Quality Weighting 30% Price Weighting 70%
Evaluation Scoring Contractor(s) Score 97.30% Unsuccessful Tenderer
Scoring Range  Not applicable
How Has “Best Value”
Been Demonstrated? See section 3 of the Award Report and Appendix 2
Additional Comments 
Award Details
General Overview Total / Maximum Value £7,994,000 Contract Duration
(Months) 36
Contractor Registered
Name(s) Virgin Media Business Limited
Contractor Overview Registered Local Authority
Area
Berkshire (Reading
Borough Council) Contractor(s) Size Large
Living Wage Paying the Living Wage Yes Living Wage Accredited No
Overview of
Community Benefits Non-financial Support for a Community Project / Organisation (x4)
Additional Comments 
Impacts
Summary,
Public Sector
Equality Duty
and Fairer
Scotland Duty
☐ HR Policy
Impact ☐ Data Protection
Impact ☐ Environment /
Carbon Impact ☐ Risk Impact ☒
Children’s
Rights and
Wellbeing
Impact
☐
Financial
Impact ☒ Legal Impact ☐ Technology /
Digital Impact ☐ Comms impact ☐ Armed Forces
Covenant Duty ☐ 
Page 236 of 248

Page 237

Appendix 2 – Supporting Benchmarking Exercise 
Hardware Component Type C9350-48HX
C9300X-12Y with Stack
Kit C9200L-48T-4X
estimated quantity over 3 years 280 60 770
Virgin Bid Pricing £3,775.38 £4,094.39 £1,098.24
Computacenter Benchmarking Framework RM6098
Direct Award from catalogue £10,528.45 £9,955.78 £1,501.12
Virgin Hardware Bid Total £1,057,106.40 £245,663.40 £845,644.80
Computacenter Benchmark Total £2,947,966.00 £597,346.80 £1,155,862.40
Benchmarking Discount % -64.14% -58.87% -26.84% 
Page 237 of 248

Page 238

Page 238 of 248

Page 239

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    JMcK/CPT Date 04/03/26 
Contracts awarded below Committee approval threshold 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail McKinstryJ@northlan.gov.uk  Telephone 07939 281 102 
Executive Summary
In accordance with the Council’s General Contract Standing Orders (“GCSOs”), GCSO
21.10 requires a summary report be presented to members with details of contracts
awarded since last committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the contract awards made since last committee reporting cycle.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 19
Page 239 of 248

Page 240

1. Background 
1.1 The Local Government (Scotland) Act 1973 section 81 requires local authorities to
“…make standing orders with respect to the making by them or on their behalf of
contracts for the supply of goods or materials or for the execution of works.”. 
1.2 The Council’s General Contract Standing Orders (“GCSOs”) set out the council’s
specific procurement procedures and responsibilities at all spend levels, and include
the reporting requirements of procurement activity, including contracts awards, to
committee for either approval or acknowledgement. 
2. Report 
2.1 In accordance with GCSO 21.10, this report summarises the contract awards since last
committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
2.2 If you require further information regards the contract awards reported, please refer to
the lead service area / Chief Officer detailed in the appendix. 
3. Measures of success 
3.1 All requirements contracted contribute to either the council’s programme of work and/or
fulfil a statutory requirement. 
3.2 All contract awards secure best value for the council in accordance with their evaluation
criteria. 
3.3 All necessary diligence has been undertaken in the evaluation and appointment of
contractors. 
3.4 All contract awards are logged in the council’s contract register. 
4. Supporting documentation 
4.1 Appendix 1 Summary of contracts awarded. 
James McKinstry
Chief Officer (Assets and Procurement) 
5. Impacts 
5.1 Impacts considered as part of the contract award procedures are recorded in the
individual contract award reports held by the lead service area.  
Page 240 of 248

Page 241

Appendix 1 – Summary of Contracts Awarded 
Contract Ref NLC-CPT-24-117
Title Professional Property Consultancy Service
Classification Services
Chief Officer, Procuring Service Area James McKinstry, Chief Officer (Assets and Procurement)
Competition Governance by Value Higher Threshold Regulated Procurement – The Public Contracts (Scotland) Regulations 2015
Procurement Route Open Procedure
No. of Expressions of interest 82
No. of Bids Received 7
Award Criteria Most Economically Advantageous Tender (“MEAT) Scoring Model
Evaluation Scores – Successful 94.25% - 79.78%
Evaluation Scores – Unsuccessful 70.14% - 53.14%
Comments The Agreement is structured under a single lot framework with four (4) appointed contractors.
Award
Details
Value £475,000
Contract Duration 48 months (initial 24 months, option to extend 12 months, further option to extend 12 months)
Contractor Name
(4x Appointments) 
BNP Paribas Real Estate
Advisory & Property
Management UK Limited
Colliers International
Property Advisers UK LLP
Graham & Sibbald LLP Savills Commercial
Limited
Contractor Size Large Company Large Company SME Large Company
Contractor Location London London Dundee London
Status - Payment of Living Wage? Yes Yes Yes Yes
Status - Living Wage Accredited? No Yes No Yes
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer
Scotland Duty ☐
HR Policy Impact ☐ Data Protection
Impact ☐
Environment / Carbon
Impact ☐
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☐
Communications
Impact ☐
Armed Forces
Covenant Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer 
Page 241 of 248

Page 242

Contract Ref NLC-SLP-25-116
Title Patch My PC
Classification Services
Chief Officer, Procuring Service Area Greg Telfer, Chief Officer (Finance and Technology)
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks 
Procurement Route Call-off following Direct Award using a Third Party Framework (Multi Contractor Framework)
No. of Framework Contractors] 44
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments This call-off was made considering the relevant technical and commercial information from NHS NSS,
Digital Workspace Solutions 2 Framework (SBS10510).
Award
Details
Value £109,240
Contract Duration 36 months
Contractor Name Phoenix Software Ltd
Contractor Size SME
Contractor Location Yorkshire
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? Yes
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer
Scotland Duty ☐
HR Policy Impact ☐ Data Protection
Impact ☐
Environment / Carbon
Impact ☐
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☒
Communications
Impact ☐
Armed Forces
Covenant Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer 
Page 242 of 248

Page 243

Contract Ref NLC-SLP-25-071
Title Information Storage Solution Replacement
Classification Supplies
Chief Officer, Procuring Service Area Greg Telfer, Chief Officer (Finance and Technology)
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks 
Procurement Route Call-off following Direct Award using a Third Party Framework (Single Contractor Framework)
No. of Framework Contractors 1
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments This call-off was made considering the relevant technical and commercial information from Scottish
Government Technology Peripherals and Infrastructure Framework - Lot 1 IT Equipment Catalogue (SP-
21-012)
Award
Details
Value £185,467.82
Contract Duration 60 months
Contractor Name Computacenter UK
Contractor Size Large Company
Contractor Location Hertfordshire
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? No
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer
Scotland Duty ☐
HR Policy Impact ☐ Data Protection
Impact ☐
Environment / Carbon
Impact ☐
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☐
Communications
Impact ☐
Armed Forces
Covenant Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer 
Page 243 of 248

Page 244

Contract Ref NLC-SLP-25-051
Title Pantheon Web Hosting
Classification Supplies
Chief Officer, Procuring Service Area Greg Telfer, Chief Officer (Finance and Technology)
No. of Bids
Received
Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks 
Procurement Route Call-off following Direct Award using a Third Party Framework (Multi Contractor Framework)
No. of Framework Contractors 4000 (An intelligent search of the G-Cloud 14 catalogue, aligned with the specification, identified two
suitable suppliers)
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments This call-off was made considering the relevant technical and commercial information from Crown
Commercial Services G-Cloud 14 Framework - Lot 3 Cloud Support (RM1557.14)
Award
Details
Value £100,350
Contract Duration 36 months
Contractor Name Manifesto Digital Limited
Contractor Size SME
Contractor Location London
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? No
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer
Scotland Duty ☐
HR Policy Impact ☐ Data Protection
Impact ☐
Environment / Carbon
Impact ☐
Risk Impact ☐ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☐
Communications
Impact ☐
Armed Forces
Covenant Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer 
Page 244 of 248

Page 245

Contract Ref NLC-SLP-25-083
Title UiPath Licensing
Classification Services
Chief Officer, Procuring Service Area Greg Telfer, Chief Officer (Finance and Technology)
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks 
Procurement Route Call-off following Direct Award using a Third Party Framework (Single Contractor Framework)
No. of Framework Contractors 1
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments This call-off was made considering the relevant technical and commercial information from Scottish
Government Software Value Added Re-Seller Framework (SVAR) (SP-21-034)
Award
Details
Value £63,870.99
Contract Duration 12 months
Contractor Name Computacenter UK
Contractor Size Large Company
Contractor Location Hertfordshire
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? No
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer
Scotland Duty ☐
HR Policy Impact ☐ Data Protection
Impact ☐
Environment / Carbon
Impact ☐
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☐
Communications
Impact ☐
Armed Forces
Covenant Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer 
Page 245 of 248

Page 246

Contract Ref NLC-CPT-24-085
Title IT Cabling Services Framework
Classification Services
Chief Officer, Procuring Service Area Greg Telfer, Chief Officer (Finance and Technology)
Competition Governance by Value Higher Threshold Regulated Procurement – The Public Contracts (Scotland) Regulations 2015
Procurement Route Open Procedure
No. of Expressions of interest  30
No. of Bids Received 8
Award Criteria Most Economically Advantageous Tender (“MEAT) Scoring Model
Evaluation Score – Successful 99.40%
Evaluation Scores – Unsuccessful 86.73% - 49.46%
Award
Details
Value £480,000
Contract Duration 48 months (initial 24 months, option to extend 12 months, further option to extend 12 months)
Contractor Name ACI Integrated Solutions
Contractor Size SME
Contractor Location Glasgow
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? No
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer
Scotland Duty ☐
HR Policy Impact ☐ Data Protection
Impact ☐
Environment / Carbon
Impact ☐
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☐ Legal Impact ☐ Technology / Digital
Impact ☒
Communications
Impact ☐
Armed Forces
Covenant Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer 
Page 246 of 248

Page 247

Contract Ref NLC-SLP-24-089
Title Webcasting & Associated Services
Classification Supplies
Chief Officer, Procuring Service Area Rachel Blair, Chief Officer (Legal and Democratic)
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks 
Procurement Route Call-off following Direct Award using a Third Party Framework (Multi Contractor Framework)
No. of Framework Contractors Over 4,000
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments This call-off was made considering the relevant technical and commercial information from Crown
Commercial Services G-Cloud 14 Framework - Lot 2 Cloud Support (RM1557.14)
Award
Details
Value £217,911.69
Contract Duration 28 months
Contractor Name Public-I Group Limited
Contractor Size SME
Contractor Location Sussex
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? Yes
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer
Scotland Duty ☐
HR Policy Impact ☐ Data Protection
Impact ☒
Environment / Carbon
Impact ☐
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☒
Communications
Impact ☒
Armed Forces
Covenant Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer 
Page 247 of 248