Agenda Document Pack - Finance and Resources Committee - 10/09/2025

North Lanarkshire Council · 10 September 2025
Back to Finance and Resources Committee — 10 September 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Clerk Name: Karen Swan
Clerk Telephone: 07919 730272
Clerk Email: committee@northlan.gov.uk
1 September 2025
Members of the
Finance and Resources Committee
Chief Executive’s Office
Rachel Blair
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk
Notice is given that a Meeting of the Finance and Resources Committee is to be held in
the Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on
Wednesday, 10 September 2025 at 10:00 AM which you are requested to attend.
The agenda of business is attached.
Rachel Blair
Chief Officer (Legal & Democratic)
Members :
B McCulloch, A Ballinger, M Boyd, G Brennan, T Carragher, C Costello, S Coyle, D
Crichton, G Currie, K Duffy, A Duffy-Lawson, J Hume, D Johnston, T Johnston, P Kelly, A
Khan, K Larson, G Lennon, J Logue, H Loughran, F MacGregor, A Masterton, P McDade, R
McKendrick, J McLaren, M McPake, J McPhilemy, L Nolan, P Patton, C Quigley, L Roarty,
G Robinson, W Shields, A Smith, L Stubbs, R Sullivan, A Thomas, S Watson, C Williams, G
Woods.
Page 1 of 292

Page 2

Page 2 of 292

Page 3

Agenda
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000
Minutes
2 Minute of Meeting of Employee Appeals Sub
Committee of 17 June 2025
Submit the Minute of the Meeting of Employee Appeals
Sub Committee of 17 June 2025.
9 - 10
3 Minute of Meeting of Employee Appeals Sub
Committee of 13 August 2025
Submit the Minute of Meeting of Employee Appeals
Sub Committee of 13 August 2025.
11 - 12
Operational
4 Brighter Futures Programme of Work – NL
Academies
Submit report by Chief Officer (People Resources)
advising of various projects for Young People to
provide job ready skills to access growth industries and
opportunities for adults in North Lanarkshire.
13 - 24
5 Local Public Holidays for Factories and
Businesses 2026
Submit report by Chief Officer (Legal and Democratic)
seeking consideration of the local public holidays in
calendar year 2026 for factories and businesses in
North Lanarkshire.
25 - 28
6 North Lanarkshire Council Registration Service -
2023 Performance Review and Operating Model
Submit report by the Chief Officer (Legal and
Democratic) providing an overview on the performance
of the Councils Registration Service during 2023
together with the ongoing review of the operational
arrangements and service delivery model.
29 - 38
Page 3 of 292

Page 4

7 North Lanarkshire Properties LLP - Performance
Indicators - 1 October 2024 to 31 March 2025,
Financial Performance as at 3rd January 2025 and
Action Plan Update
Submit report by Chief Officer (Assets and
Procurement) detailing North Lanarkshire Properties
LLP's performance, financial performance and action
plan following the Arm's Length External Organisations
Review 2024.
39 - 68
8 Glasgow City Region Investment Zone Update
Submit report by Chief Officer (Finance and
Technology) providing an update on the ongoing
development of the Glasgow City Region Investment
Zone programme, and specifically the proposal of Non-
Domestic Rates Retention Sites.
69 - 76
Performance
9 Annual Procurement Report 2024-25
Submit report by Chief Officer (Assets and
Procurement) seeking approval of the Annual
Procurement Report 2024/25.
77 - 124
Financial
10 Revenues and Benefits Update
Submit report by Chief Officer (Finance and
Technology) providing an update on the performance
within the Revenues and Benefits functions of Finance
as at 30 June 2025.
125 - 134
11 Revenue Monitoring Report Council Summary 1
April 2025 to 18 July 2025
Submit report by Chief Officer (Finance and
Technology) (1) providing an update on the overall
financial position for the General Fund Account,
Housing Revenue Account and Adult Health and Social
Care, for the financial year to 31 March 2026; (2)
consolidating the budget monitoring position of all
Services, and (3) highlighting and explaining major
outturn variances as per the Council's approved
Financial Regulations.
135 - 144
Page 4 of 292

Page 5

12 Revenue Budget Monitoring Report - Chief
Executive's Service 1 April to 18 July 2025 (Period
4)
Submit report by Chief Officer (Finance and
Technology) (1) providing a summary of the Chief
Executive's financial performance for the Period from 1
April to 18 July 2025 (Period 4) and (2) illustrating the
provisional outturn as at 31 March 2026, with major
outturn variances highlighted and explained per the
Council's approved Financial Regulations.
145 - 156
13 Capital Programme 2025-26 Monitoring Report
Submit report by Chief Officer (Finance and
Technology) (1) providing an update on the 2025/26
resources and expenditure for the Council's Strategic
Capital Investment Programme, and (2) detailing the
2025/26 projected outturn position and the resultant
variances.
157 - 168
14 Chief Executives Service - Capital Monitoring
Report 1 April to 18 July 2025 (Period 4)
Submit report by Chief Officer (Finance and
Technology) highlighting the financial performance and
projected outturn of the 2025/26 Chief Executive's
capital programme for the period ended 18 July 2025
(Period 4).
169 - 174
15 Treasury Management Monitoring Report for
quarter ended 30 June 2025
Submit report by Chief Officer (Finance and
Technology) informing of the quarterly Treasury
Management activity for the period from 1 April to 30
June 2025 together with the mandatory treasury and
prudential indicators.
175 - 192
16 Treasury Management Annual Activity Report –
2024-2025
Submit report by Chief Officer (Finance and
Technology) outlining the treasury management activity
undertaken during 2024/2025 and the resulting impact
on the Council's borrowing and investment strategy.
193 - 222
Page 5 of 292

Page 6

17 2024-25 Annual Outturn
Submit report by Chief Officer (Finance and
Technology) informing that the annual statutory
accounts of the Council for the year ended 31 March
2025 were reported to the Audit and Scrutiny Panel at
its meeting of 26 June 2025 and subsequently
submitted to the Council's External Auditors, Audit
Scotland, by the statutory date of 30 June.
223 - 228
18 Review of 2025-26 to 2027-28 Budget Savings
Submit report by the Chief Officer (Finance and
Technology) providing an update on the achievement
of the three-year financial savings total, approved as
part of the 2025/26 budget setting process.
229 - 234
19 General Debtors Write-Off  2025-26
Submit report by Chief Officer (Finance and
Technology) presenting a summary of outstanding
debtor accounts which are deemed uncollectable
following all attempts at recovery or are not
economically viable to continue to pursue.
235 - 240
20 General Debtors Write Off 2025-26 People
Resources
Submit report by Chief Officer (People Resources)
presenting a summary of outstanding debtor accounts
which are deemed uncollectable following all attempts
at recovery or are not economically viable to continue
to pursue.
241 - 246
Remit
21 Remit - Adult Care & Social Work - Sundry Debt
Write Off 2025
Submit report by Chief Officer (Adult Social Work
Services) providing a summary of outstanding debtor
accounts which are deemed uncollectable following all
attempts at recovery or are considered uneconomically
viable to continue pursuing.
247 - 252
Page 6 of 292

Page 7

22 Remit - Education, Children and Families
Committee - Annual Bad Debt Write-Off Exercise
Submit report by Chief Officer (Education North)
providing a summary of outstanding debtor accounts
relating to previous financial years which are deemed
either to be uncollectible following all attempts at
recovery or are not economically viable to continue
pursuing.
253 - 258
23 Remit - Housing Committee - Sundry Debt Write Off
2025
Submit report by Depute Chief Executive providing a
summary of outstanding debtor accounts which are
deemed uncollectable following all attempts at recovery
or are considered uneconomically viable to continue
pursuing.
259 - 264
Contracts
24 Contract Award for Provision of Merchant
Acquiring Services (2025-2029)
Submit report by Chief Officer (Finance and
Technology) acknowledging the decision taken by the
Depute Chief Executive on 25 June 2025 to the award
of contract to the Provision of Merchant Acquiring
Services provided by Lloyds Bank plc.
265 - 272
25 Contract Award for the Provision of Utilities
(Electricity, Gas and Water)
Submit report by Chief Officer (Assets and
Procurement) advising of the Council's continued
participation in utility arrangements procured by
Scottish Procurement for supply of Electricity, Natural
Gas and Water and Waste Billing.
273 - 282
26 Contract awarded below Committee approval
threshold
Submit report by the Chief Officer (Assets and
Procurement) notifying of the Contracts Awarded since
the last meeting of the Committee with a value below
the financial threshold requiring approval.
283 - 292
Page 7 of 292

Page 8

EXCLUSION OF PUBLIC
The Sub-Committee is asked to consider passing the
following resolution: "That under Section 50A(4) of the
Local Government (Scotland) Act 1973, the public be
excluded from the meeting for the following item of
business on the grounds that it involves the likely
disclosure of exempt information as defined in
paragraphs 6 and 9 of Part 1 of Schedule 7A of the
Act".
27 Affordable Housing Purchase - 75 Units, Mid
Forest, Cumbernauld
Submit report by Chief Officer (Assets and
Procurement) seeking approval to purchase of 75
affordable housing properties at Mid Forest,
Cumbernauld.
28 Ground Lease Extension -  42-62 Telford Place
Lenziemill Industrial Estates Cumbernauld
Submit report by Chief Officer (Assets and
Procurement) seeking approval of extension to an
existing ground lease of land at Telford Place,
Lenziemill Industrial Estate, Cumbernauld.
Remit Exempt
29 Remit - Housing Committee - Property-Related
Matter - Debt Adjustment
Submit report by the Depute Chief Executive regarding
a proposed debt adjustment associated with a property
acquisition to facilitate the progression of a strategic
regeneration initiative.
Page 8 of 292

Page 9

EMPLOYEE APPEALS SUB – 17 JUNE 2025 
1
Tuesday, 17 June 2025 at 10am. 
A Meeting of the EMPLOYEE APPEALS SUB-COMMITTEE 
PRESENT 
Councillor Reddin, Convener, Councillor B McCulloch, Vice-Convener, Councillors Ballinger, Beveridge, Boyd,
Currie, Hume, Leckie, Masterton, Roarty and Woods. 
CHAIR 
Councillor Reddin (Convener) presided. 
IN ATTENDANCE 
Chief Officer (Finance & Technology), Employment and Policy and Manager and Democratic Co-Ordinator. 
APOLOGIES 
Councillor Jones and Thomas. 
DECLARATIONS OF INTEREST IN TERMS OF THE ETHICAL STANDARDS IN PUBLIC LIFE ETC.
(SCOTLAND) ACT 2000 
1. There were no declarations of interest. 
It was agreed in terms of Section 50A(4) of the Local Government (Scotland) Act 1973, that the public
be excluded from the meeting for the following item on the grounds that the business involved the
likely disclosure of exempt information as defined in paragraph 1 of Part 1 of Schedule 7A of the Act. 
PROCEDURE GUIDE 
2. There was submitted the Procedures for Conduct of the appeal hearing. 
Decided: that the Procedures for Conduct of the Appeal Hearing be noted. 
FINANCE AND TECHNOLOGY - APPEAL AGAINST DISMISSAL – 2025/01 
3. There was submitted intimation of an appeal against dismissal by Appellant 2025/01, together with a
report by the Chief Officer (Finance and Technology) in explanation of the circumstances leading to
the dismissal. 
The Convener advised that a request to postpone the hearing had been received from the Appellant
as their Trade Union Representative was unable to attend. 
Decided: that the meeting be postponed and re-arranged to a future date. 
Item 2
Page 9 of 292

Page 10

Page 10 of 292

Page 11

EMPLOYEE APPEALS SUB – 13 AUGUST 2025 
1
Tuesday, 13 August 2025 at 2pm. 
A Meeting of the EMPLOYEE APPEALS SUB-COMMITTEE 
PRESENT 
Councillor Reddin, Convener, Councillor B McCulloch, Vice-Convener, Councillors Ballinger, Beveridge, Boyd,
Cairns, Currie, Hume, Leckie, Masterton and Roarty.   
CHAIR 
Councillor Reddin (Convener) presided. 
IN ATTENDANCE 
Chief Officer (Finance & Technology), Employment and Policy Manager and Democratic Co-Ordinator. 
ALSO IN ATTENDANCE 
Appellant 2025/02. 
APOLOGIES 
Councillors Jones, Thomas and Woods. 
DECLARATIONS OF INTEREST IN TERMS OF THE ETHICAL STANDARDS IN PUBLIC LIFE ETC.
(SCOTLAND) ACT 2000 
1. There were no declarations of interest. 
It was agreed in terms of Section 50A(4) of the Local Government (Scotland) Act 1973, that the public
be excluded from the meeting for the following item on the grounds that the business involved the
likely disclosure of exempt information as defined in paragraph 1 of Part 1 of Schedule 7A of the Act. 
PROCEDURE GUIDE 
2. There was submitted the procedures for conduct of the appeal hearing. 
Decided: that the procedures for conduct of the Appeal Hearing be noted. 
FINANCE AND TECHNOLOGY - APPEAL AGAINST DISMISSAL – 2025/02 
3. There was submitted intimation of an appeal against dismissal by Appellant 2025/02, together with a
report by the Chief Officer (Finance and Technology) in explanation of the circumstances leading to
the dismissal. 
The Sub Committee then heard representations and submissions from the Chief Officer (Finance and
Technology) and a relevant officer from the Service and representations and submissions from
Appellant 2025/02.   
The Convener explained that deliberations could take some time and each party was given the
opportunity to either wait to be recalled by the Sub-Committee or for the Clerk to advise the decision
by phone. 
The Chief Officer (Finance and Technology) requested to be recalled to the meeting.
Item 3
Page 11 of 292

Page 12

EMPLOYEE APPEALS SUB – 13 AUGUST 2025 
2
Appellant 2025/2 requested that they receive a phone call advising them of the decision of the Sub-
Committee.   
Thereafter, both parties withdrew from the meeting. 
The Chief Officer (Finance and Technology) was the readmitted to the meeting. 
Decided: that the grounds of the appeal had not been substantiated and the appeal not be
upheld. 
Page 12 of 292

Page 13

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    FW/LS Date 10/09/25 
Brighter Futures programme of work – NL Academies 
From  Fiona Whittaker, Chief Officer (People Resources)  
E-mail WhittakerF@northlan.gov.uk Telephone 07973 728628 
Executive Summary
The Brighter Futures Programme of Work (PoW) is a wide-ranging series of projects that
aims to improve educational attainment, job opportunities, entrepreneurship, and
volunteering.  It is about preparing young people and the wider community for the future
through specialised education, voluntary work and enterprise and making sure there are
clear pathways for them to get jobs in industries of the future.   
NL Academies forms a key part of Brighter Futures by working closely with businesses and
partners in thriving industry sectors such as the built environment, health and social care
and digital to create innovative but viable pathways to employment, boosting jobs and
economic growth. NL Academies are also responsible for leading the creation and
development of the council’s Social Value Framework to enhance the outcomes from
procurement activity. 
This report describes various ongoing activity under the 4 deliverables set for NL
Academies.  This includes externally funded project work, like summer placements, skills
training for young people giving them job ready skills to access growth industries and
opportunities for adults in North Lanarkshire to enter training and finish with a well-paid job
in a growing industry.  It also describes wider strategic activity around creating partnerships
with employers in industry through the formation and progress in the Built Environment
Sector Board and Care Academy Steering Group and an enhanced approach to realising
social value across the council’s procurement activity. 
The report recognises the key drive to enhance attraction and equalities to key industry
sectors and also acknowledges the next steps to be taken to further progress the work of
NL Academies.
Recommendations
It is recommended that the Finance and Resources committee: 
(1) Endorse and approve the contents of this report, the progress made and next steps. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Item 4
Page 13 of 292

Page 14

1. Background 
1.1 The Programme of Work (PoW) 2023-2028 as approved at Policy and Strategy
Committee in March 2023, is key to achieving the shared ambition as set out in The
Plan for North Lanarkshire.   Within the Brighter Futures PoW, a Delivery Framework
is in place to ensure alignment and interconnectedness towards achieving the aims
of Brighter Futures and a high-level list of deliverables against each programme have
been identified detailing the roadmap to delivering the scale and impact required to
deliver the vision of inclusive growth and prosperity for all.   
1.2 The Brighter Futures strategic aims centre around: 
• Creating opportunities for young people and the wider community and connecting
them to employment.
• Maximising growth and meeting the needs of North Lanarkshire’s employers and
key sectors.
• Fully leveraging all resources and seeking opportunity to grow resources and
funding.
• Providing alternative pathways for residents to contribute and support North
Lanarkshire’s economy and communities.
• Supporting the recovery of the North Lanarkshire labour market. 
1.3 Of the five themes of the Brighter Futures PoW, this report focuses on NL Academies,
however, there are clear links and interdependencies with the other themes:
Curricular Pathways, Employability and Community Learning and Development,
Volunteering and Entrepreneurship.   
1.4 NL Academies drives collaborative efforts between industry, the council and various
partners to develop a skilled workforce to meet the needs of key industry sectors
which are currently the built environment, health and social care and digital.  This is
achieved through a shared ambition, strong and mutually beneficial relationships, and
a clear commitment to innovation and excellence, local community wealth building
and a focus on sustained and circular economic growth.   
1.5 NL Academies plays a key role in shaping the work, future direction, and growth of
these key industries through: 
• defining a clear picture of key industry workforce gaps at a local level.
• commissioning relevant employment and training activities to address gaps.
• agreeing existing and new pathway priorities.
• developing new and innovative solutions and partnerships.
• driving industry collaboration and engagement, and 
• brokering joint approaches to funding. 
2. Report 
2.1 This report provides an update on the progress of the 4 deliverables of the NL
Academies theme under the Brighter Futures PoW. The deliverables are detailed in
table 1: 
Ambition statement (23) Build a workforce for the future capable of delivering on our
priorities and shared ambition
Programme of Work Brighter Futures
Page 14 of 292

Page 15

Table 1 – NL Academies deliverables: 
Deliverable 1 Ensure increased skilled workforce employed in roles which fit industry needs and
contribute to greater economic outputs.  Expand pathways and progression routes
within key sectors to connect to employment. 
Deliverable 2 Develop employer engagement within each model to ensure full participation and
increased work opportunities. 
Deliverable 3 Enhance attraction and advance equalities across key industry sectors. 
Deliverable 4 Maximise opportunities to enhance social value through the council’s procurement
activity 
2.2 The next sections of this report describe the progress under each deliverable. 
Deliverable 1 
2.3 Ensure increased skilled workforce employed in roles which fit industry needs and
contribute to greater economic outputs.  Expand pathways and progression routes
within key sectors to connect to employment. 
2.4 There are a number of activities under this deliverable with the progress of 3 of which
demonstrated in table 2, these are: 
• Continue to deliver targeted UKSPF projects towards supporting key industries
with skills and workforce gaps, 
• Enhance summer placement programme by expanding into other Health and
Social Care and Digital sectors
• Enhance pathway opportunities between existing funded vocational qualifications
and workforce demand in key sectors. 
2.5 The NL Academies team work closely with businesses and partners in industry
sectors within the built environment, health and social care and digital to create
innovative but viable pathways to employment, boosting jobs and economic growth.
This involves leading on projects such as external summer placements, skills training
for young people giving them job ready skills to access growth industries, and
opportunities for adults to enter training and finish with a well-paid job in a growing
industry. Table 2 provides details of projects delivered by NL Academies, funded via
UK Shared Prosperity Funding (UKSPF) or via social value which demonstrate activity
under deliverable 1: 
Table 2 – NL Academies projects and residents supported: 
Built Environment Academy 
Project Description No. of NL
residents
supported
SP Energy
Networks – Adult
Craft
Apprenticeships –
Year 1 and 2 
SP Energy
Networks –
Funding provided to SP Energy Networks (SPEN) and their Supply Chain
Partners to permanently employ up to 15 North Lanarkshire residents, to
train them via their Adult Craft Apprenticeship programme and continue
their employment beyond completion of the training into LV Cable Jointer
roles with salary prospects circa £35k/40k pa. 
11 
3
Page 15 of 292

Page 16

Overhead Line
Inspectors 
Funding provided to SPEN to permanently employ three North
Lanarkshire residents, into Overhead Line Inspector roles and to train
them accordingly. 
BE-ST – Low
Carbon Learning 
Young learners undertaking Foundation Apprenticeships, or who are
interested in the Built Environment - provision of workshops suitable for
aspiring young people with an interest in the sector. The sessions cover
retrofit, Passivhaus, digital construction and modern methods of
construction. 
Teacher focussed event delivering similar content to above. 
162 
11
Future In
Construction 
This programme is designed to support anyone aged 16+ from North
Lanarkshire to take their first steps into Construction and gain real work
experience. 
41
BE-ST Next Gen
Summit 
S1 pupils participated in this hands-on experience in sustainable design,
aiming to inspire the next generation toward careers in a net-zero carbon
built environment. The event featured an Eco School Project by education
programme creators ‘Class of Your Own’ integrating the Design,
Engineer, Construct curriculum with a focus on sustainability. Pupils
worked in teams, taking on real-world roles such as surveyor, director,
and architect to design environmentally friendly, energy-efficient school
buildings. 
172
Build Your Future  Aimed at S2 and S3 pupils Build Your Future provides young people with
the insight, knowledge and skills they need to develop their awareness
and experience of Construction and the Built Environment. Through a
mixture of skills masterclasses and re-purposing design challenges,
young people are given the opportunity to explore place making and get
hands on with skills demonstrations across a variety of trades.
140 
Digital Academy 
Project Description No. of NL
residents
supported
Digital Youth
Academy - Cohort
1 and 2 
ASN Programme
in conjunction
with No Limits 
This programme provided 2 bootcamps over a 4-week period for 16–24-
year-olds. The bootcamps completed were “Business” and “Digital Skills”
for young people with no or basic IT skills where they learned problem
solving, PC passport, office systems user, introduction to digital
marketing, web skills, creative content skills and CV building and
preparing for interviews. Candidates were supported to find
apprenticeship opportunities following completed of the bootcamps. 
A specific programme was delivered to extend the NLC/QA Digital Youth
Academy to a group of young people with additional support needs who
were participating in the council’s No Limits programme via the Supported
Employment team. The programme was specifically tailored to the digital
needs of the participants in a fun and creative learning environment and
provided opportunities in both digital and life skills. 
47 
11
Digital Labs  Flexible, community-based, ‘Digital Labs’ have been set up by the
libraries and CLD teams across North Lanarkshire to provide local adults
aged 16+ with the relevant skills, confidence, and motivation to get online. 
Funded to date by the NL Digital Academy, support is given to those who
currently have no digital device of their own as well as those who need
support with an existing device. Learners are being supported to drop-in
to their local ‘Lab’ to learn how to use tablets, laptops, and smartphones
through both Public Access Computing (PAC) and ‘bring your own device’
(BYOD) approaches. As Digital Labs does not require a fixed suite of
computers, staff are able to respond quickly to local and individual
demands. 
829 
Page 16 of 292

Page 17

Care Academy 
Project Description No. of NL
residents
supported
Trainee Social
Worker
Programme 
The programme offers existing staff the opportunity to study with the
Open University to gain a BA (Hons) in Social Work whilst continuing to
work for the council in several rotational placements giving them access
to a wide range of meaningful, challenging and supportive situations. This
programme is currently running with 9 staff who are training to become
fully qualified Social Workers. 
8
Equalities
Recruitment 
Identification of target groups via the NLC Resettlement team and Cllr
Khan (Equalities champion) – modified recruitment process leading to
recruitment of 33 employees from Ukrainian / Congolese backgrounds. 
33 
Cross cutting activity 
Project Description No. of NL
residents
supported
Summer
Placement
Programme
(external
placements) 
This programme provides young people of North Lanarkshire the
opportunity to learn new skills, develop existing skills and earn money
whilst gaining vital work experience during school summer holidays. 
Students from local high schools, priority groups and New College
Lanarkshire are given the opportunity to gain hands-on experience
working across a range of employment sectors. Placements in 2024
spanned key industries including the Built Environment, Health & Social
Care and Digital Technology, with students working with external
construction companies and NHS Lanarkshire.   
Students who embark on built environment placements, are supported to
gain a Green Labourer CSCS Card and towards the end of placement all
students attend a “My Skills My Future” workshop.  In 2025, students are
working towards an employability certificate supported by colleagues in
CLD. 
To acknowledge the success of the programme and achievements of the
students, a celebration event is held. In 2024, over 300 people were in
attendance including students, their managers, parents/guardians and
external contractors and businesses.   
In 2025, 53 external placements are taking place across various sectors
(built environment, digital, automotive, political, nursing, podiatry,
occupational therapy, NHS Admin and care) 
2024 – 23 
2025 - 53   
Total residents supported via NL Academies funded programmes  1544 
2.6 The final activity underway in deliverable 1 is to develop and implement the Built
Environment Academy on a phased basis. As previously reported to committee, the
council commissioned a Built Environment Sector Board (BESB) which is led by
industry and exists to drive collaborative efforts between industry, the council and
relevant partners to support skills development and workforce demands to meet the
evolving needs of the sector. The BESB is progressing 3 interconnected workstreams;
North Lanarkshire built environment ecosystem research, creation of a Youth
Engagement Strategy and development and implementation of the North Lanarkshire
Built Environment Academy. 
2.7 To fully understand the future demand and supply of built environment skills in the
area, research is being commissioned to create the evidence based to support to work
of the BESB. The research will consider the supply and demand for construction skills
Page 17 of 292

Page 18

leading to potential mismatches by undertaking a series of activities and stakeholder
sessions to; assess the construction labour demand within North Lanarkshire, identify
the occupations at potential risk of mismatches based on the workforce in North
Lanarkshire and beyond and carry out an analysis of the structure of the construction
industry in the area. The research commenced on 1 July 2025 and is expected to
complete by end September 2025 whereby the analysis will be reviewed and specific
activities directed towards supporting the industry with mismatches. 
2.8 The creation of a Youth Engagement Strategy for the built environment sector is key
to ensure enhanced engagement with young people to connect them to the workforce
and employment opportunities the sector can provide both now and in the future. The
strategy is expected to be completed by the first quarter of 2026. The aims and
objectives of the strategy are highlighted in table 3: 
Table 3 – Built Environment Youth Engagement Strategy aims and objectives: 
Youth Engagement Strategy aims and objectives
Set out the direction and actions required to engage, attract and recruit young
people to careers in the built environment.
Ensure the strategy aligns with ongoing activity, such as existing education
provision, funded projects and the Summer Placement programme, and to create
further opportunities to engage this group and enhance equalities.
Ensure alignment with wider programmes taking place nationally via industry
bodies and / or other national programmes.
Highlight, promote and champion entrepreneurship opportunities within the sector. 
2.9 The creation of the Built Environment Academy has the potential to bring various
benefits to supporting the region, residents and industry as detailed in figure 1: 
Figure 1 – potential benefits of a North Lanarkshire Built Environment Academy: 
2.10 A full business case for the Academy is expected to be completed by the end of 2025
Page 18 of 292

Page 19

and will consider options around a physical location, funding sources and will include
proposals for phased implementation, incorporating apprenticeship delivery and
upskilling for the industry. 
Deliverable 2  
2.11 Develop employer engagement within each model to ensure full participation and
increased work opportunities. 
2.12 Within deliverable 2, activity is focused on engaging employers to ensure increased
work opportunities by continuing to support the industry led sector boards within the
built environment and health and social care. Enhancing digital employer
engagement, creating partnerships and understanding the workforce is key towards
developing the Digital Academy.  
Sector boards 
2.13 The Built Environment Sector Board is commissioned by the council and led by a
Chairperson from industry with the update on progress described at sections 2.6 to
2.10 of this report. 
2.14 Similar activity is also underway in the Pan-Lanarkshire Care Academy where 5
workstreams exist to progress towards the aims of the Care Academy and respond to
opportunities arising from workforce challenges (and future demand) which exist
within the Health and Social Care Partnerships across Lanarkshire. The partnership
formalises working relationships between the councils, NHS Lanarkshire and partners
such that there is a process in place for identifying, defining, and progressing potential
opportunities for engagement through collaboration. Figure 2 highlights the link
between the Care Academy aims, the supporting workstreams and their purpose. It
should be noted that workstreams 4 and 5 have recently commenced and are in the
process of developing specific actions linked to their purpose.
Figure 2 – Care Academy aims and workstreams: 
Page 19 of 292

Page 20

2.15 The range of programmes and activity within workstreams 1, 2 and 3 is highlighted in
figure 3: 
Figure 3 – Care Academy activity for workstreams 1,2 and 3 
2.16 Each workstream is refreshing activities required to be progressed across the short,
medium and long term to ensure activity is consistent and reflective of changing
workforce demands and the economic profile of the area. 
Deliverable 3 
2.17 Enhance attraction and advance equalities across key industry sectors. 
2.18 To ensure a future workforce within key industry sectors in North Lanarkshire, it is
essential to attract people to these industries and enhance equality of access to skills
and jobs. In addition to the funded projects detailed in table 2 of this report, attraction
activities for young people and adults into Health and Social Care is progressing via
the Care Academy workstreams 2 and 3 detailed in figure 2. Progress has also been
made in implementing and scaling collaborative apprenticeships and other vocational
pathways with NHS Lanarkshire and the Lanarkshire HSCP's. 
2.19 Within NLC and in partnership with NHSL, a collaborative Modern Apprenticeship has
been created and implemented. The Integrated Health and Social Care Modern
Apprenticeship will provide apprentices with diverse exposure to both healthcare and
social care environments to foster a more holistic skills set and encouraging
collaboration between partners. The apprentices will work in the Integrated Rehab
Team with occupational therapy across NLC and NHSL across a 2-year programme,
gaining an SCQF (Scottish Credit and Qualifications Framework) level 6 in year one
and SCQF level 7 in year 2, with the first 2 Modern Apprentices commencing in these
posts in August 2025. These posts are fully aligned towards hard to fill roles and
through a “grow your own” approach, pathways are in place on completion of the
apprenticeship to continue with education and progress into a job.                                                                                       
Page 20 of 292

Page 21

2.20 Within the built environment the work to create and implement the Youth Engagement
Strategy as described at section 2.8 of this report is fundamental to aligning ongoing
activities towards the outcomes of the research around skills and workforce gaps in
the industry. 
2.21 Planned for 2025/26 under this deliverable is to continue to enhance equalities and
enable UKSPF funded projects designed to support veterans transitioning into civilian
employment and working with colleagues in Restorative Justice to focus on
rehabilitation, skills development and reintegration into work through meaningful
employment in the built environment sector. 
Deliverable 4 
2.22 Maximise opportunities to enhance social value though the council’s procurement
activity 
2.23 As previously reported to committee in 2024, a key element to continuing the work of
NL Academies is developing a model which supports longer term sustainable funding.
Deliverable 4 picks up the need for the council to enhance social value through
procurement activity, for programmes like NL Academies and wider council priorities
linked to The Plan for North Lanarkshire. 
2.24 Whilst it is recognised the council is committed to maximising social value, there is an
opportunity to gain further value from the businesses we engage with and from the
contracts we procure. The council’s capital investment programme along with other
larger procurements provide significant opportunities to maximise the benefits
delivered via social value, particularly within the Built Environment Sector. 
2.25 The council’s Social Value Manager is now in post and sits alongside the NL
Academies team with a specific focus on creating an effective Social Value
Framework and operating model (people and technology) to maximise and fully
leverage our outcomes.  The proposal to base this post within the NL Academies team
is due to the intrinsic link from social value to the NL Academies model and the wider
Brighter Futures PoW and the need to build sustainable programmes to create
opportunities with scale and impact, due to the instable funding environment which
exists within opportunities around apprenticeships, pathways development and skills
training. 
2.26 The creation and implementation of the Framework will assist in driving consistency
of approach in managing and monitoring activities. It will also encourage services to
effectively utilise procurement to achieve wider financial and non-financial outcomes
when awarding contracts, it will strengthen and enhance opportunities in delivering
benefit to our communities and it will describe how we will embed social value
principals into the commissioning, procurement, and contract management practices.
The framework will also take into account reporting measures to ensure enhanced
visibility of the social value outcomes in a joined up and consistent way. 
2.27 The Social Value Framework is current being drafted and is planned to be presented
to a future committee in cycle 4 of 2025. 
Summary and next steps 
2.28 Considerable progress has been made across the 4 main deliverables for NL
Academies.  Various projects have been developed and implemented over the past
Page 21 of 292

Page 22

12 months ensuring a reach across a wide range of groups within North Lanarkshire.
The teams work to engage employers within key industry sectors has been crucial
and will remain a key area of focus to ensure the employers voice is at the core of
understanding workforce challenges and considering solutions. 
2.29 The work to enhance the council’s approach to social value is key to feed the NL
Academies model by augmenting sustainable programmes and creating opportunities
with the required scale and impact. This will contribute towards the ability for NL
Academies to continue to deliver industry specific initiatives making the most of
opportunities around apprenticeships, pathways development and skills training. 
2.30 Some key next steps exist within the deliverables for NL Academies, these are to
create the business case and begin implementing the North Lanarkshire Built
Environment Academy. Aligned to this is the research into skills and workforce
demand within the industry and progressing the Youth Engagement Strategy to
ensure awareness and attraction to the range of occupations which exist within the
sector. Continuing to enhance attraction to the Health and Social Care sectors and
working in partnership across the Pan-Lanarkshire Care Academy is also vital to
supporting the skills and workforce needs of the sector. Within the digital sector,
progress has been made in engaging and upskilling residents and to further progress
this, enhancing digital employer engagement and creating partnerships within the
sector is a priority for 2025 and 2026. 
2.31 Further updates to committee will be provided on an annual basis in line with the
council’s reporting framework. 
3. Measures of success 
3.1 Success in NL Academies will be measured via the UKSPF reporting on the outputs
and outcomes aligned to the applicable intervention and via the Brighter Futures
Delivery Framework, which links to the council’s Strategic Performance Framework.
Performance reporting for Brighter Futures is due to commence in October 2025 to
ensure regular monitoring and measurement of success within NL Academies and
the wider Brighter Futures programme of work. 
4. Supporting documentation 
4.1 None. 
Fiona Whittaker
Chief Officer (People Resources) 
Page 22 of 292

Page 23

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 23 of 292

Page 24

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 24 of 292

Page 25

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    RB/MH Date 10/09/25 
Local Public Holidays for Factories and Businesses 2026 
From  Rachel Blair, Chief Officer (Legal and Democratic)  
E-mail BlairR@northlan.gov.uk Telephone  07958 166105 
1. Background 
1.1 North Lanarkshire Council is required to determine annually the dates of local public
holidays applicable to factories and businesses operating within its area. These
designations ensure clarity for employers and employees and support consistency in
business and service planning. 
1.2 Local public holidays are set by individual local authorities and therefore may differ
between neighbouring council areas. The proposed dates have been selected to align
with established local practice and recognised regional observances 
2. Report 
2.1 It is proposed that the following dates be designated as local public holidays for
factories and businesses within North Lanarkshire during 2026: 
2.1.1 Thursday 1 and Friday 2 January 2026;
Executive Summary
This report seeks approval for the proposed schedule of local public holidays for factories
and businesses within North Lanarkshire for the 2026 calendar year. 
Recommendation
It is recommended that the Finance and Resources Committee: 
(1) Approve the proposed local public holiday dates for factories and businesses in
North Lanarkshire for 2026, as detailed in Section 2 of this report. 
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (15) Encourage the health and wellbeing of people through a
range of social, cultural, and leisure activities
Programme of Work Statutory / corporate / service requirement
Item 5
Page 25 of 292

Page 26

2.1.2 Friday 3 and Monday 6 April 20226; 
2.1.3 Monday 20 July 2026 (Glasgow Fair Monday); 
2.1.4 Monday 28 September 2026; and 
2.1.5 Friday 25 and Monday 28 December 2026. 
2.2 The proposed dates have been selected to: 
• Align with traditional holiday periods observed, including New Year, Easter and 
Christmas; 
• Provide consistency for businesses and employees, supporting workforce planning 
and operational continuity; 
• Avoid unnecessary disruption by coordinating with existing regional and national 
holiday patterns, ensuring minimal impact on cross-boundary travel and trade; and 
• Maintain continuity with previous years’ arrangements, providing predictability for 
employers and employees in scheduling annual leave and production cycles. 
3. Measures of success 
3.1  Approval of this report will provide early confirmation of the public holiday schedule,
enabling factories, businesses and employees to plan operational and staffing
arrangements for the 2026 calendar year.   
4. Supporting documentation 
N/A. 
Rachel Blair 
Chief Officer (Legal and Democratic) 
Page 26 of 292

Page 27

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The determination of local public holidays is carried out under the Council’s statutory
powers, and approval of the proposed dates ensures compliance with relevant legal
obligations while providing clarity for businesses and employees regarding
recognised non-working days. 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 27 of 292

Page 28

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 28 of 292

Page 29

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    RB/CJ Date 10/09/25 
North Lanarkshire Council Registration Service: 2023
Performance Review and Operating Model 
From  Rachel Blair, Chief Officer (Legal and Democratic)  
E-mail BlairR@northlan.gov.uk Telephone  07958 166105 
Executive Summary
This report provides an overview of the performance of North Lanarkshire Council’s
Registration Service during 2023, together with an update on the ongoing review of
operational arrangements and service delivery model. 
The Registration Service continues to manage high levels of demand, delivering statutory
functions relating to births, deaths and marriages, as well as civil ceremonies and
citizenship services, on behalf of the Registrar General for Scotland. Significant
transformation of service delivery has taken place since the COVID-19 pandemic, including
the introduction and formalisation of remote registration methods under the Coronavirus
(Recovery and Reform) (Scotland) Act 2022. 
The review of Registration Services has identified opportunities to centralise staffing at the
Dalziel Building, Motherwell, while continuing to provide face-to-face appointments in the
three key locality areas of Cumbernauld, Airdrie and Coatbridge to maintain community
accessibility. This approach supports the Council’s wider Leadership and Operating Model
and aligns with the strategic direction set out in the Council’s Programme of Work and
office rationalisation commitments approved by the Policy and Resources Committee in
2019.
Recommendations 
It is recommended that the Finance and Resources Committee acknowledges: 
(1) The performance of North Lanarkshire Councils Registration Service during 2023; 
(2) The analysis of registration trends, in particular the decline in face-to-face appointments
and growth in remote registrations from 2022 to 2024; 
(3) The continued provision of a blended operating model enabling residents to access
registration services either remotely or in person; 
(4) The outcome of the ongoing review which has resulted in phased staff relocations within
Airdrie and Motherwell; 
(5) The centralisation of the Registration Service, with staff relocating to the Dalziel
Building, Motherwell, while retaining locality-based face-to-face appointments; 
Item 6
Page 29 of 292

Page 30

1. Background 
1.1 North Lanarkshire Council’s Registration Service is part of Legal and Democratic and
undertakes statutory functions on behalf of the Registrar General for Scotland,
including the registration of births, deaths and marriages. In addition, the Service
conducts civil ceremonies (marriages, civil partnerships) and citizenship ceremonies. 
1.2 The Registration Service employs 12 staff (10.5FTE), designated as static workers,
with eight staff holding the nationally recognised Certificate of Proficiency in the Law
and Practice of Registration. These staff ensure compliance with all statutory
obligations and best practice guidance issued by the National Records of Scotland
(NRS). 
1.3 The Registration Service currently operates from three primary offices: Airdrie,
Cumbernauld, and Motherwell. In line with the Council’s office rationalisation policy
approved in 2019, all registration staff have now been centralised at the Dalziel Building
in Motherwell. 
1.4 Importantly, this centralisation does not reduce accessibility for residents. Face-to-face
appointments continue to be delivered at both Airdrie and Cumbernauld offices,
supported by a managed appointment system to ensure efficient use of resources while
maintaining local provision.  
1.5 Looking forward, a review will be undertaken to explore additional opportunities for in-
person appointments across other locality venues, fully aligned with the Council’s
Leadership and Operating Model. This will ensure the service remains flexible,
responsive to community needs, and strategically positioned within the wider
transformation agenda. 
2. Report 
2.1 Performance is routinely monitored through internal performance management
frameworks and independently assessed annually by District Examiners from NRS.
The most recent audit, summarised at Appendix 1, demonstrates that the Registration
Service continues to perform at a consistently high level, achieving accuracy rates in
excess of 97% across all three districts (North, Central, and South). 
2.2 In 2023, a total of 8,100 life events were registered, comprising 3,033 births, 4,399
deaths, and 650 marriages, alongside civil partnerships and stillbirth registrations. Error
rates remained low, with an overall 2.02% error rate across all registrations. The South
district recorded the highest volume of events (3,433) and also achieved the lowest
(6) That this is consistent with the Council’s Leadership and Operating Model and the
Programme of Work for office rationalisation; and 
(7) That further work will be undertaken to ensure full adoption of the Leadership and
Operating Model within registration services as the review progresses.
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (20) Improve the involvement of communities in the decisions,
and development of services and supports, that affect them
Programme of Work Statutory / corporate / service requirement
Page 30 of 292

Page 31

error rate (1.63%), highlighting both the scale and quality of work being delivered within
that area. 
2.3 While the data confirms consistently strong performance, it also reflects variations in
demand across localities, with Central and South handling notably higher volumes of
deaths and marriages compared to North. These trends are informing workforce
deployment and the design of the blended delivery model, ensuring that resources are
aligned to patterns of demand while maintaining service quality across all localities. 
2.4 The resilience and professionalism of the registration staff are particularly noteworthy,
given the backdrop of significant resource pressures, service transformation and the
transition to remote and blended operating models. The ability to sustain such accuracy
levels through this period of change reinforces confidence in the robustness of service
delivery and the effectiveness of ongoing quality assurance processes.  
2.5 Prior to the COVID-19 pandemic, all registration activity was conducted face-to-face,
with physical attendance required to comply with statutory processes. The Coronavirus
(Scotland) Act 2020 introduced emergency measures allowing remote registration
(primarily by telephone) and digital submission of statutory documents. These changes: 
2.5.1 Enabled continuity of service during public health restrictions; and 
2.5.2 Demonstrated significant benefits in terms of accessibility, convenience and efficiency
for residents. 
2.6 Analysis of the Registration Service’s operational data from 2022 to 2024 at Appendix
2 demonstrates a significant and sustained shift from traditional in-person appointments
toward remote registrations across all life events (births, deaths, and marriages). This
reflects both customer preference and legislative changes that permanently embedded
remote registration following the COVID-19 pandemic. Key observations are as follows. 
2.7 Birth Registrations: 
2.7.1 In 2022, North Lanarkshire North recorded 486 in-person births compared to 102
remote. By 2024, this trend had reversed, with 214 remote births compared to only 20
in-person. 
2.7.2 Central and South districts display similar patterns: Central rising from 87 remote births
(2022) to 1,187 (2024); South rising from 173 remote births (2022) to 1,311 (2024). 
2.7.3 Across all districts, remote registrations now account for the overwhelming majority of
birth registrations, indicating a strong shift in customer behaviour. 
2.8 Death Registrations: 
2.8.1 Death registration was already largely remote by 2022, and this trend has
strengthened: for example, North moved from 969 remote registrations in 2022 to 187
in 2024, and Central rose from 1,648 remote in 2022 to 2,297 in 2024. 
2.8.2 Remote methods are now the default approach for death registrations, reflecting both
customer convenience and operational efficiency. 
2.9 Marriage Registrations: 
Page 31 of 292

Page 32

2.9.1 Marriage registrations have historically remained in-person, given the ceremonial and
legal requirements. However, the associated administrative elements (e.g., notices of
marriage) have increasingly shifted toward remote processes, with in-person
appointments declining steadily (e.g., North Lanarkshire North dropped from 375 in-
person marriages in 2022 to 186 in 2024).
2.10 Analysis of the data from 2022 to 2024 highlights a clear shift in customer behaviour
and service delivery methods. In-person registrations have declined sharply across all
event types and localities, falling from several hundred per district in 2022 to double-
digit or low triple-digit figures by 2024. In contrast, remote registrations have grown
significantly, in some cases increasing more than tenfold, for example, remote birth
registrations in the Central district rose from 87 in 2022 to 1,187 in 2024. This trend
strongly supports the continuation of a blended operating model, with remote
registration positioned as the default method, while ensuring that face-to-face
appointments remain available for complex cases or where customers have specific
needs or preferences.
2.11  In line with the Council’s approved Leadership and Operating Model, a comprehensive
review of Registration Services commenced in 2022. This review has now been
implemented in full and has resulted in a phased relocation of staff to ensure greater
efficiency and resilience:
2.11.1 Staff previously based in Cumbernauld were amalgamated with the Airdrie Area
Registration Office team to consolidate resources and enhance service consistency;
and
2.11.2 Following this, the combined team from Airdrie was relocated to the Dalziel Building,
Motherwell, establishing a single operational base for all registration staff.
2.12 This consolidation has delivered improved supervision, streamlined processes, and
greater operational flexibility, while ensuring that local service accessibility is
maintained. 
2.13 Although all staff are now based in Motherwell, the three existing registration districts,
Cumbernauld, Airdrie, and Motherwell, remain in place and residents in each area
continue to have access to face-to-face appointments. These are delivered via a
managed appointment system, allowing the service to respond flexibly to customer
need while prioritising efficiency. This approach ensures that residents across North
Lanarkshire retain convenient local access to registration services, despite the
centralisation of staff.
2.14 The revised structure demonstrates full alignment with the Council’s Leadership and
Operating Model by:
2.14.1 Centralising specialist expertise in Motherwell, ensuring consistent professional
standards;
2.14.2 Retaining localised service delivery points through continued provision of in-person
appointments across three districts;
2.14.3 Enhancing resilience and flexibility by enabling staff to be deployed as required across
multiple locations; and
2.14.4 Supporting further digital transformation and process modernisation, in lone with
national legislative and technological developments.
Page 32 of 292

Page 33

2.15 Further work will be undertaken during the next phase of the review to ensure full
integration of the Leadership and Operating Model principles within the Registration
Service, including consideration of whether additional locality appointment venues may
be identified to further enhance accessibility.
3. Measures of success
3.1 The successful centralisation of the Registration Service, combined with the blended
delivery model, will be evaluated against several key outcomes. Operational efficiency
is expected to be demonstrated through the removal of duplication, more effective
deployment of resources, and the achievement of ongoing cost savings. Service
accessibility will be measured by the continued availability of local face-to-face
appointments in Cumbernauld, Airdrie and Coatbridge, ensuring that residents across
North Lanarkshire can still access services in their localities.
3.2 Performance outcomes will continue to be assessed through internal monitoring and
annual external audits, with a commitment to maintaining accuracy rates at or above
96% in line with National Records of Scotland standards. Customer satisfaction will
also remain a priority, with feedback gathered to gauge ease of access to both remote
and in-person registration services. Finally, success will be judged on the extent to
which the new arrangements fully embed the principles of the Council’s Leadership and
Operating Model and contribute to the wider office rationalisation objectives established
by the Council.
4. Supporting documentation
4.1 Appendix 1 - Registration Service Performance 2023.
4.2 Appendix 2 - Registration Service Demand and Delivery Trends (2022–2024).
Rachel Blair
Chief Officer (Legal and Democratic)
Page 33 of 292

Page 34

5. Impacts
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts been discussed and agreed with
Finance?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
The proposals outlined in this report carry no adverse legal implications.  The
Registration Service will continue to operate fully in compliance with statutory duties
under the Registration of Births, Deaths and Marriages (Scotland) Act 1965 and
associated legislation, with oversight from the Registrar General for Scotland.
Centralisation of staff does not alter the Council’s legal responsibilities for service
provision and statutory standards of accuracy and accessibility will continue to be
met.
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal
data?
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk
Yes ☐ No ☐
Page 34 of 292

Page 35

5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)?
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)?
Yes ☐ No ☒
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC).
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out?
Yes ☐ No ☐
Page 35 of 292

Page 36

Appendix 1
Registration Service Performance 2023
District
Name
Births Deaths Religious
Marriages
Civil
Marriages
Total
Marriages
Civil
Partnerships
Stillbirths Total
Events
No. of
Entries
with
Errors
% of
Entries
without
Corrections
%
Error
Rate
North
Lanarkshire,
North 
711 920 139 49 188 5 2 1,826 36 98.03% 1.97%
North
Lanarkshire,
Central
862 1,821 87 69 156 1 1 2,841 72 97.47% 2.53%
North
Lanarkshire,
South
1,460 1,685 191 115 306 2 7 3,433 56 98.73% 1.63%
Total 3,033 4,399 147 233 650 8 10 8,100 164 97.98% 2.02%
Page 36 of 292

Page 37

Appendix 2
Registration Service Demand and Delivery Trends (2022 – 2024)
2022
District Name Births Deaths Marriages
In-Person Remote In-Person Remote In-Person Remote
North Lanarkshire North 486 102 - 969 375 -
North Lanarkshire Central 908 87 - 1,648 289 -
North Lanarkshire South 1,210 173 - 1,802 857 -
2023
District Name Births Deaths Marriages
In-Person Remote In-Person Remote In-Person Remote
North Lanarkshire North 223 488 - 920 410 -
North Lanarkshire Central 330 532 - 1,821 349 -
North Lanarkshire South 934 526 - 1,658 675 -
2024
District Name Births Deaths Marriages
In-Person Remote In-Person Remote In-Person Remote
North Lanarkshire North 20 214 - 187 186 -
North Lanarkshire Central 128 1,187 - 2,297 505 -
North Lanarkshire South 216 1,311 - 1,807 643 -
Page 37 of 292

Page 38

Page 38 of 292

Page 39

North Lanarkshire Council  
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    NLP/IM/JMcK Date 09/09/25 
North Lanarkshire Properties LLP – Performance Indicators: 1
October 2024 to 31 March 2025, Financial Performance as at 3rd
January 2025 and Action Plan Update 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail MartinI@northlan.gov.uk Telephone Ian Martin
Tel: 07966 397637 
Executive Summary 
This report provides details of North Lanarkshire Properties LLP’s (NLP LLP) performance
from 1 October 2024 to 31 March 2025 (Q3&Q4) and provides an update on significant
events and service delivery highlights during the reporting period. 
The report also provides details of the financial performance for the period from 1st April
2024 to 3rd January 2025. 
This report also provides details of North Lanarkshire Properties LLP’s (NLP) action plan
in response to the opportunities and development areas identified in the Arm’s Length
External Organisations (ALEO) Review 2024, approved by the Policy and Strategy
Committee on 13 March 2025.
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledges NLP LLP’s operational performance against its 2024/25 targets for
the period 1 October 2024 to 31 March 2025; 
(2) Acknowledges NLP LLP’s financial performance during the period from 1 April 2024
to 3 January 2025. 
(3) Acknowledges the Service delivery highlights detailed within the report. 
(4) Acknowledges the NLP action plan to address the opportunities and development
areas detailed within the Arm’s Length External Organisations (ALEO) Review 2024.
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (3) Maximise the use of our marketable land and assets through
improved development in business and industrial infrastructure
Programme of Work Transforming Places
Item 7
Page 39 of 292

Page 40

1. Background 
1.1 NLP LLP is a limited liability partnership established in 2013 between the Council and
its wholly owned company, North Lanarkshire Property Investments Ltd. It undertakes
the marketing, leasing and management of the Council’s commercial property portfolio
(shop units, office accommodation, business centres, industrial yards and storage
units) and, on behalf of the Council, manages legacy properties which remain in the
Council’s investment property portfolio. It also delivers services in relation to externally
owned properties that the Council leases for its own operational use and provides
general advice on lease transactions. 
1.2 Governance, strategic direction and oversight of the limited liability partnership is
provided by the Management Committee which comprises four elected members and
one senior Council officer appointed by the Council and one member appointed by the
limited company, NL Property Investments Ltd. Members to the Board of Directors of
the limited company, NL Property Investments Ltd, are also appointed by the Council
with five elected members and one senior officer appointed. The Management
Committee meets quarterly and is responsible for ensuring NLP LLP’s services are
delivered in accordance with the approved Service Level Agreement and company
objectives. 
1.3 The Management Committee undertook a number of measures to implement
recommendations from the ALEO review completed in 2019, most significantly, the
establishment restructure and enhancement proposals approved in February 2019. 
1.4 NLP LLP has been comprehensively reviewed in 2019 and 2024 with the latest review
being reported to the Policy and Strategy Committee on 13 March 2025 where it was
agreed that no change to the external delivery arrangements are feasible at this time.
It is recognised that the outcome may have been different if the ‘buy out’ option of the
existing loan had been assessed as feasible. The review did identify some opportunities
and areas for future development and the recommendations in respect of NLP LLP are
summarised below: 
• Prepare a detailed action plan by 30th June 2025 to address the opportunities for
future development.
• Re-examine the review findings following the drafting of the Council’s 2025/26
Annual Accounts.
• Work with Council officers to identify properties which create scope to facilitate
transformational change within town centres and communities. 
1.5 Following consideration of the ALEO review report the Policy and Strategy Committee
also decided that the Council will now present key financial performance information as
part of the regular revenue budget monitoring reporting through Finance and
Resources Committee on a quarterly basis. This will commence from Cycle 3 in 2025
and the start of formal reporting of the 2025/26 financial position for the Council. 
1.6 In addition to contractual performance monitoring by this committee, the Audit and
Scrutiny Panel is responsible for ensuring the effectiveness of each entity’s governance
arrangements, including financial governance. The Policy and Strategy Committee
retains responsibility for considering the outputs from reviews by the Council into its
arm’s length delivery arrangements, including recommendations in relation to Best
Value and potential future delivery options. 
Page 40 of 292

Page 41

2. Report 
Performance Indicators 
2.1 Responsibility for oversight of service delivery by arm’s length bodies rests with the
relevant service committee. The functions delivered by NLP LLP on behalf of the
council fall within the Terms of Reference of this committee and a six-monthly
performance report is submitted in line with the Strategic Performance Framework
considered by members in November 2019. The report will confirm where NLP LLP is
fulfilling its contractual obligations and meeting the council’s service delivery
expectations, as well as providing information from Finance on financial performance
and overall financial standing within the company. This information will help give early
warning of any financial risks which may give rise to operational or reputational risks
for the council. 
2.2 2024/25 Performance indicators are listed at appendix 1 along with actual performance
for the period 1 October 2024 to 31 March 2025, which fulfil the reporting requirements
agreed between the organisation and the council and further demonstrate where NLP
LLP is contributing to the council’s strategic priorities. 
2.3 During the reporting period a total of 20 properties were let, renewed or assigned (5
Office; 3 Retail, 11 Industrial and 1 other) and there were 14 lease terminations over
the corresponding period. 
2.4 The percentage of vacant properties across the NLP portfolio over the corresponding
period are shown at Section 12 in Appendix 1. 
Service Delivery Highlights 
2.5 In conjunction with the Growth team, the development of the Braidhusrt Industrial site
nears completion with the redevelopment of 6 existing units and the further construction
of an additional 10 which will continue to support new start up and small businesses.
The development has been delayed due to utility issues however the team continue to
liaise with the relevant providers to conclude the works. NLP have commenced soft
marketing of the site and currently noting interest.  
Financial Impact 
2.6 To satisfy the Council’s duty to ensure the organisation delivering property
management services on its behalf is financially sound, the Council’s Section 95 Officer
maintains appropriate and proportionate processes and procedures for scrutinising
NLP LLP’s financial performance. 
2.7 The Council’s Legal Agreements with NLP LLP specify the financial information which
NLP must submit to the Council including an annual business plan, quarterly
management accounts, audited financial statements etc., to enable Finance to assess
and report any financial risk likely to arise as a result of the Council using NLP LLP to
deliver these services. 
2.8 The Council expends revenue resources annually with NLP LLP to deliver services
which assist the Council in achieving its priority outcomes. The Council has a duty to
continue to ensure this money is being properly used to deliver both the Council’s and
NLP LLP’s key objectives. 
Page 41 of 292

Page 42

2.9 For financial year 2024/25, the Council’s approved revenue spend includes property
management services (£0.198m) and rental charges for properties utilised by the
Council. 
Financial Performance 1 April 2024 to 3 January 2025 
2.10 Based on the financial performance at 3 January 2025 a projected transfer into
reserves of £0.905m is reported to 31 March 2025 which is a favourable movement
against a budgeted transfer into reserves of £0.486m. The position is reflective of
increased bank interest received and income rental. Further details on financial
performance are given in Appendix 2. 
2.11 Appendix 3 provides Balance Sheet balances as at 3 January 2025 along with the
comparative figures as at 31 March 2024. Council representatives are asked to note: 
• The company has net assets of £51.135m predominately due to improvements in
payments to Creditors and reduced cash balances due to improved timing of
payments to creditors. This is a favourable movement of £2.230m on the previous
year-end position.
• Members should be assured that the company has sufficient resources to meet its
current obligations. 
Projected Cashflow to December 2024 
2.12 Appendix 4 provides the projected cashflow to 31 December 2025. The minimum
balance of cash projected to be held is £4.640m in April 2025. The cashflow position
includes approved utilisation of reserves. This demonstrates that NLP will continue to
hold sufficient levels of cash. 
Bank Covenant 
2.13 The new loan facility also revised the covenant arrangements, with a focus on achieving
an Actual Debt Service Covenant (ADSC) ratio of 1.1:1 each period. As at P10 the
ADSC is 1.28: which is in excess of the revised ratio agreed. 
Budget 2025/26 
2.14 A range of budget planning scenarios were considered during the budget setting
process. The budget, approved by the Board in February 2025, is based on
assumptions which are in line with those used in North Lanarkshire Council medium
term financial plan. 
2.15 The NLP Board approved a budget transferring £0.388m into reserves after loan debt
repayments. The budget incorporates anticipated increased expenditure in employee
costs, janitorial supplies and financing costs offset by increased bank interest. 
2.16 Following the refinancing of the Loan Facility, NLP LLP are required to report against
the ADSC covenant and are budgeting a rate of 1.19:1. Further details of the 2025/26
Budget are given at Appendix 5. Performance against approved budget will continue to
be carefully monitored throughout the forthcoming year. 
2.17 NLC continue to monitor NLP financial performance closely with updates provided to 
the Corporate Management Team. 
Page 42 of 292

Page 43

NLP Action Plan 
2.18 The outcome of the review of the council’s remaining ALEO’s was reported to the Policy
and Strategy Committee on 13 March 2025. The report made a number of
recommendations, some of which were specific to each individual ALEO. 
2.19 The aforementioned Policy and Strategy report identified 17 areas for future
development within NLP under 4 main themes which are: 
1. Address Staffing, Recruitment and Succession Planning Challenges
2. Strengthen Business and Investment Planning
3. Portfolio Review
4. Improve Customer Engagement and Clarity 
2.20 The action plan, attached at Appendix 6, has been developed in consultation with
officers across NLP, Assets and Procurement, Legal and Democratic Services, People
and Organisational Development, Finance, and the Business Partnership team. It
serves as an initial assessment of the proposed actions and is intended to be a dynamic
document, subject to continuous review and refinement. Progress will be monitored
and reported regularly to the NLP Board. Oversight of the plan’s implementation will be
provided to the Finance and Resources Committee on an annual basis through the
performance monitoring report. 
2.21 The NLP Board approved the action plan at a special meeting on 30 June 2025. 
2.22 The Policy and Strategy also approved a recommendation to re-examine the financial
feasibility of transitioning NLP to in-house delivery and repaying the loan following the
drafting of the 2025/26 Annual Accounts. It should be recognised that timing and
implementation of the action plan could be impacted by the outcome of this review,
particularly action 4. 
3. Measures of success 
3.1 The financial position of the company is being monitored closely to ensure that NLP
LLP will continue to meet its loan obligations. 
3.2 Completion of the Braidhurst development will provide new industrial units for start up
and small businesses and provide an additional income stream for NLP LLP. 
3.3 Implementation of the action plan will assist NLP in addressing identified areas for
future development ensuring the ALEO continues to meet its business objectives both
now and in the future. In addition, NLP’s alignment to the Plan for North Lanarkshire
and strategic direction will be more clearly demonstrated.   
4. Supporting documentation 
4.1 Appendix 1 – Performance Update – 1 October 2024 to 31 March 2025.
4.2 Appendix 2 - Financial Performance to 3rd January 2025
4.3 Appendix 3 - Overall Financial Standing – Balance Sheet as at 3rd January 2025
4.4 Appendix 4 - Cashflow Forecast to 31st December 2025
4.5 Appendix 5 - Approved Budget 2025/26
4.6 Appendix 6 - NLP Action Plan 
Page 43 of 292

Page 44

James McKinstry
Chief Officer (Assets and Procurement)  
Page 44 of 292

Page 45

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The financial performance of NLP is closely monitored by the council’s Section 95
Officer and the financial performance along with other key financial information is
detailed within the report. 
The financial feasibility of transitioning to in-house delivery and repaying the loan will
be re-examined following the drafting of the 2025/26 annual accounts. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The action includes measures to address staffing, recruitment and succession
planning challenges within NLP, in addition to examining the potential for outsourcing
the management of the portfolio. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
Page 45 of 292

Page 46

5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 46 of 292

Page 47

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐     
Page 47 of 292

Page 48

Page 48 of 292

Page 49

Page 49 of 292

Page 50

Page 50 of 292

Page 51

Page 51 of 292

Page 52

Page 52 of 292

Page 53

Page 53 of 292

Page 54

Appendix 2 
North Lanarkshire Properties LLP
Year to date 03 January 2025
Income & expenditure 2024/25 2024/25 2024/25 Commentary:-
Annual Budget vrs Projected Outturn
Annual
Budget
Projected 
Outturn Variance
£m £m £m
Rental, SLA income and Insurance Income 6.407 6.804 0.396 Favourable variance in relation to rental income.
Investment and other income 0.778 1.122 0.344
In-year drawdown on reserves to fund Braidhurst
Units coupled with anticipated income for
dilapidation works within the 2 depots.
Total Income 7.185 7.926 0.740
Expenditure;
Employee costs (0.769) (0.715) 0.054 Favourable variance due to vacancies.
Property Costs (2.721) (2.945) (0.223) Adverse variance relating to building costs and
repairs and maintenance.
Supplies & Services  & Admin Costs (0.785) (0.825) (0.040) Adverse variance due to increased ICT costs.
Financing Costs (1.991) (2.036) (0.045)
Floating loan interest payments are calculated on
SONIA rates which fluctuate over the course of
the year.
Total Expenditure (6.266) (6.520) (0.254)
Trading Profit 0.920 1.405 0.486
Loan Principal Repayments (0.500) (0.500) 0.000
Profit Transferred to/(out) Reserves 0.420 0.905 0.486
Page 54 of 292

Page 55

Appendix 3 
North Lanarkshire Properties LLP
Overall Financial Standing - Balance Sheet as at  03 January 2025
Balances/ Indicator As at
03 Jan 2025
As At 
31 March 2024 Variance Commentary
£m £m £m
Fixed Assets 73.946 73.946 0.000
Current Assets:
Trade Debtors 0.910 0.901 0.009 Minor
Bad Debt Provision (0.241) (0.241) 0.000
Prepayment and Other Debtors 0.000 0.000 0.000
Bank and short term investments 6.583 7.088 (0.505) Timing of payments.
7.251 7.748 (0.496)
Current Liabilities:
Creditors (0.327) (2.049) 1.722 Year end accountancy adjustments and timing
of payments.
Other Creditors inc. VAT & other taxes (0.404) (1.005) 0.601 VAT due to HMRC and accrued interest.
Loan payments due in <1 yr (0.500) (0.500) 0.000
(1.231) (3.554) 2.322
Net current Assets/(liabilities) 6.020 4.194 1.826
Loan repayments due in > 1 yr (28.831) (29.235) 0.404 Loan Repayment Schedule agreed with bank .
Defined scheme pensions liabilities 0.000 0.000 0.000
Net Asset / (Liabilities) 51.135 48.905 2.230
Page 55 of 292

Page 56

Appendix 4 
0.0
1.0
2.0
3.0
4.0
5.0
6.0
Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25 Jul-25 Aug-25 Sep-25 Oct-25 Nov-25 Dec-25
Balance -£m
NLP Cash Flow Forecast to December 2025
Total Balances
Page 56 of 292

Page 57

Appendix 5
North Lanarkshire Properties LLP
Approved Budget - 2025/26
Income & expenditure 2024/25 2025/26 Commentary
Annual
Budget
Approved
Annual Movement
£m £m £m
Rental, SLA income and Insurance Income 6.407 6.404 (0.003) Minor
Investment and other income 0.778 0.075 (0.703) Removal of one-off 2024/25 in-year uplift to fund
investment in property portfolio and consultancy fees.
Total Income 7.185 6.479 (0.706)
Expenditure;
Employee costs (0.769) (0.800) (0.031)
Budget increased to reflect actual pay increases arising
from pay awards during 2024/25 and estimated
additional pay awards for 2025/26.
Property Costs (2.721) (2.041) 0.680 Removal of one-off 2024/25 in-year uplift to fund
investment in property portfolio.
Supplies & Services  & Admin Costs (0.785) (0.713) 0.072 Removal of one-off 2024/25 in-year uplift to fund
consultancy fees and ICT upgrades.
Financing Costs (1.991) (2.037) (0.047) Loan interest payements are based on projected SONIA
rates.
Total Expenditure (6.266) (5.591) 0.674
Accounting Profit 0.920 0.888 (0.032)
Accounting adjustments:
FRS17 pension costs 0.000 0.000 0.000
Unrealised gain/(loss) on investment portfolio 0.000 0.000 0.000
Loan Principal Repayments (0.500) (0.500) 0.000
Profit Transferred to/(out) Reserves 0.420 0.388 (0.032)
Page 57 of 292

Page 58

Appendix 6 
Page 58 of 292

Page 59

Page 59 of 292

Page 60

Page 60 of 292

Page 61

Page 61 of 292

Page 62

Page 62 of 292

Page 63

Page 63 of 292

Page 64

Page 64 of 292

Page 65

Page 65 of 292

Page 66

Page 66 of 292

Page 67

Page 67 of 292

Page 68

Page 68 of 292

Page 69

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref      Date 10/09/25 
Glasgow City Region Investment Zone Update 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail WeirY@northlan.gov.uk Telephone Yvonne Weir
07508 001238 
Executive Summary 
This report provides Finance and Resources Committee with an update on the ongoing
development of the Glasgow City Region Investment Zone (GCR IZ) programme, and
specifically the proposal of Non-Domestic Rates Retention Sites. 
Recommendations
It is recommended that the Finance and Resource Committee: 
(1) Acknowledge the ongoing development of the Glasgow City Region Investment Zone
programme, including the identification of potential Investment Zone site in North
Lanarkshire; 
(2) Acknowledge that North Lanarkshire Council will continue to be responsible for
collecting Non-Domestic Rates locally; 
(3) Agree that additional Non-Domestic Rates associated with the Investment Zone site
be retained and pooled at the GCR level and re-invested back into the GCR IZ
programme in line with overall IZ objectives and this re-investment should be
determined by GCR Cabinet in line with already agreed governance arrangements
associated with the City Deal programme.   
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (3) Maximise the use of our marketable land and assets through
improved development in business and industrial infrastructure
Programme of Work Transforming Places
Item 8
Page 69 of 292

Page 70

1. Background 
1.1 Glasgow City Region Investment Zone (GCR IZ) is progressing through the
Government five-stage Gateway Process for approval of the Investment Zone
programme. This process was instigated following announcement in the summer of
2023 that Glasgow City Region (GCR) would receive £160m grant allocation and be
the location of one of the two Investment Zones (IZ) in Scotland and one of 12 across
the UK.  The other Scottish IZ is located in the North-East Scotland (NES) region. 
1.2 The £160 million funding envelope over 10 years, comprises both capital and revenue
funding, and includes optional fiscal incentives such as tax reliefs and non-domestic
rates retention (NDRR). 
1.3  The GCR IZ aims to accelerate economic growth, attract inward investment, and create
high-value jobs by focusing on strategic employment sectors where the region has
existing strengths and growth potential. 
1.4 Following an extensive analysis and engagement process, led by the GCR Programme
Management Office (PMO), the sectoral focus of the GCR IZ was confirmed by GCR
Cabinet (11 June 2024) as Advanced Manufacturing and Precision Engineering.
Following the recommendation of a dedicated Strategic Investment Plan, a sub-set of
the Regional Economic Partnership, Cabinet agreed on 25 February 2025 six short-
listed projects and a tax-site. Table 1 provides an overview of the projects: 
Sector Project Grant Ask
Space Skyrora £3.7m 
Project PRISM £33.2m
Semi-Conductors Laser Supply Chain £25.5m 
NCASP £35.3m 
Neuranics £5.1m
Maritime Malin Group £20m*
Tax Site N/A £30m*
Sectoral Support Investment Fund £30.7m 
Business Support / Skills £10m
Capacity Funding N/A £6.4m
Total  £200m
Table 1: GCRIZ Project Overview 
1.5 The proposed tax site is planned to be located in Renfrewshire. The tax site aims to
drive growth by leveraging key assets such as the Advanced Manufacturing Innovation
District Scotland (AMIDS), National Manufacturing Institute Scotland (NMIS),
Medicines Manufacturing Innovation Centre (MMIC), and Glasgow Airport. With a focus
on strategic land development, the site will be developed in partnership with the
landowners - Renfrewshire Council and Glasgow Airport. 
1.6 As part of the IZ programme and in addition to the tax site, Regional Economic
Partnerships (REPs) can propose three sites, of 200 hectares each, to a total of 600
hectares that could be considered as potential sites for the retention of Non-Domestic
Rates (NDRR) over a twenty-five year period.   The GCR PMO has engaged with
officers from Member Authorities (MAs) to understand the potential opportunities. 
1.7 The GCR PMO developed a high-level application and evaluation process and asked
MAs to submit options by 30 May 2025. 
Page 70 of 292

Page 71

1.8 Six of the eight MAs including North Lanarkshire Council submitted proposals to be
considered by the PMO. Based on these submissions, a number of options have been
taken forward and further refined following feedback from the Scottish Government.
Advice and guidance on the options has been provided by KPMG, through their original
GCR IZ commission with Renfrewshire Council. This has helped shape the refinement
of the three proposed NDRR locations. The proposed locations are considered to
present the best link to the Investment Zone objectives, together with the most viable
development timeline. 
1.9 Table 2 provides details of the NDRR locations that are being proposed as part of the
Gateway process, outline maps are included in Appendix 1: 
Location Member Authority Potential Size
AMIDS / Airport Renfrewshire Council 146 Hectares
Eurocentral North Lanarkshire Council 195.5 Hectares
Glasgow Clyde Corridor Glasgow City Council /
South Lanarkshire Council 
209 Hectares (*tbc)
Table 2: List of proposed NDRR locations 
1.10 Scottish Government guidance has made clear, GCR must make a robust argument
for the rationale for any proposed NDRR location. Any location must meet the ‘but-for’
test, where this is defined as; ‘retention of non-domestic rates is a direct consequence
of Investment Zone status’. It is incumbent on GCR to provide a clear narrative for the
locations that are proposed. 
1.11 The PMO has continued to work with Renfrewshire Council, North Lanarkshire Council,
Glasgow City Council, South Lanarkshire Council and Clyde Gateway Urban
Regeneration Company to further refine the location options in advance of the final
formal submission of Gateway 4 at the end of September 2025. 
1.12 The GCR PMO is confident there is a clear rationale for the three areas that have been
proposed and initial feedback from the Scottish Government supports this. The NDRR
site at the Airport / AMIDS has a clear link to the GCR IZ and the Advanced
Manufacturing sector via the proposed tax-site. Meanwhile there are already a
significant number of Advanced Manufacturing companies located within the
Eurocentral boundary. The proposal that covers GCC and SLC is centred on existing
Advanced Manufacturing activity through the Innovation Districts at both Glasgow and
Strathclyde Universities and clearly link with the ongoing development at the Clyde
Gateway URC. In addition, there were a number of strong bids for the original GCR IZ
‘open-call’ based in each of the potential locations for NDRR. 
2. Report 
Non-Domestic Rates Retention - Principles and Purpose 
2.1 The revenue generated from the retention of Non-Domestic Rates (NDR) is over and
above the GCR IZ £160m grant allocation and is the devolved responsibility of the
Scottish Government. The retention of rates is on the basis of any uplift in NDR, within
the ‘red-line’ boundary, from an agreed baseline with Scottish Government. 
2.2 As part of the Gateway process, referenced in section 1.1, GCR need to demonstrate
that any uplift in NDR would not have been possible without the Investment Zone
programme – this is how we are able to justify the retention of rates.  In the absence of
Page 71 of 292

Page 72

NDRR process, all rates collected by the Local Authority are transferred to the Scottish
Government, as normal to form part of the national NDR pooling arrangements and
redistributed across local government in accordance with agreed funding distribution
methodologies. Establishing NDRR sites as part of the programme will enable any uplift
in NDR, above an agreed baseline, to be retained and reinvested to support the GCR
Investment Zone objectives. 
2.3 As noted to a previous GCR Chief Executive’s Group meeting (14 May 2025) and GCR
Cabinet (27 May 2025), following Scottish Government guidance, any NDR retained
should be pooled at the GCR level and their re-investment supporting the objectives of
the IZ Programme, should be determined by GCR Cabinet. 
2.4 Retained non-domestic rates must be used to promote the Investment Zone’s
objectives and for activity that: would not otherwise occur; demonstrably requires public
funding; and is most appropriately funded from retained non-domestic rates, rather than
other public funding pots. 
2.5 Noted below are the GCR IZ Objectives, agreed by both GCR Cabinet and UK / Scottish
Governments: 
• Build on strengths of the Region’s current and emerging cluster specialisms 
• Grow new and existing R&D focused firms which are geared to take advantage
of local academic expertise
• Create a significant number of mid to high skilled ‘good’ jobs 
• Generate short and longer-term private sector investment in the Region’s
cluster specialisms – both through existing firms and wider supply chain
development
• Align with existing investment within the Region e.g. City Deal, Innovation
Districts / Innovation Accelerator, UK Shared Prosperity Fund 
• Maximise the impacts through enhancing connections to existing clusters
• Facilitate the development / regeneration of under-developed land and assets
within the Region
• Extends the benefit to the whole Region including developing options for a IZ
skills programme for local residents and a regional investment fund. 
2.6 GCR PMO will work with partners to develop a re-investment strategy for any NDR
retained rates to support GCR IZ objectives across the GCR geography. The
Investment Zone Technical Guidance provides clarity on the activity the income from
retained non-domestic rates growth should primarily be used to fund: 
• Investment Zone operating costs
• physical and/or digital infrastructure that will facilitate investment in the
Investment Zone area
• land assembly and/or site remediation works that will facilitate investment in the
Investment Zone area.
• skills and workforce development
• innovation initiatives
• mitigating any displacement and/or negative externalities associated with the
Investment Zone
• activity in support of the Investment Zone Net Zero ambitions
• the delivery of Investment Zone -specific planning measures 
2.7 Officers will work closely with GCR PMO to develop the re-investment strategy and
identify potential activity for support in North Lanarkshire. 
Page 72 of 292

Page 73

NDDR Governance 
2.8 A formal legal agreement will be developed between Glasgow City Council, on behalf
of Glasgow City Region, and the four Member Authorities to agree the approach for the
collection and retention of NDR within the Investment Zone programme. 
2.9 This approach will align with the established GCR governance arrangements already
in place through Finance Strategy Group (FSG), Chief Executives’ Group (CEG) and
GCR Cabinet. 
2.10 Reports have been approved by the Chief Executives’ Group (14 May 2025) and City
Region Cabinet (27 May 2025) that make reference to the pooling of the NDR at a
regional level, with their redistribution and use being agreed by Cabinet. 
Next Steps 
2.11 During September, Renfrewshire Council, Glasgow City Council, North Lanarkshire
Council and South Lanarkshire Council will all seek local committee approval for the
collection and retention of Non-Domestic Rates, in line with the requirements of
Gateway 3 process. 
2.12 A final draft of Gateway 3 and 4 will be submitted by GCR PMO to UK and Scottish
governments by 30 September 2025. Failure to meet this deadline may result in GCR
IZ losing year 1 grant of £16m.  If approval for the collection and retention of NDR
cannot be secured by any of the authorities, before the submission deadline of 30
September, the respective NDRR site will need to be removed from the GCR IZ
programme. 
2.13 Subject to Committee approval, officers will continue to engage with GCR PMO and
other Member Authorities to finalise the NDDR programme and re-investment strategy. 
3. Measures of success 
3.1  To maximise the re-investment of non-domestic rates to support the growth of the
Advanced Manufacturing sector in North Lanarkshire and across the wider GCR.   
4. Supporting documentation 
4.1 There is no supporting documentation.   
Greg Telfer
Chief Officer (Finance and Technology) 
Page 73 of 292

Page 74

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The retention of additional non domestic rates from designated Investment Zone
areas identified by Glasgow City Region provides the potential for North Lanarkshire
and the wider City Deal region to benefit from income that would otherwise form part
of the national non-domestic rates pool and be distributed across Scotland’s 32 local
authorities. 
It is not anticipated that there will be significant additional costs associated with the
administration and monitoring of the NDRR site, however, in the event that there are
any then these costs are expected to be covered through retained non-domestic
business rates.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
A formal legal agreement will be developed between Glasgow City Council, on
behalf of Glasgow City Region, and the four Member Authorities to agree the
approach for the collection and retention of NDR within the Investment Zone
programme. Any legal agreement will be considered in line with already
established City Deal governance arrangements. 
Page 74 of 292

Page 75

5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
There is a risk that the funding pooled through the NDDR programme does not
benefit development within the North Lanarkshire Council area. To mitigate this risk,
officers will be working closely with GCR PMO to develop the re-investment strategy
for the pooled funding and identifying potential investment activity that the retained
rates could be used to fund. 
There is a risk that sites developed within the NDDR do not meet the sectoral criteria
or GCR IZ Objectives. Whilst this will not prevent those sites being developed or
restrict any end-use by other sectors, it will result in a lower pool of funds raised
through the NDDR programme. 
Page 75 of 292

Page 76

5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 76 of 292

Page 77

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    JMcK/BF Date 10/09/25 
Annual Procurement Report 2024/25 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail McKinstryJ@northlan.gov.uk Telephone 07939 281012 
Executive Summary
To comply with the procurement legislation ‘The Procurement Reform (Scotland) Act 2014’,
the council is required to prepare and publish an Annual Procurement Report that details
the procurement activity in the most recently completed financial year. 
This Annual Procurement Report covers the period 1 April 2024 to 31 March 2025 and
provides: 
• an outline of the procurement activity undertaken;
• a summary of performance against the council’s Procurement Strategy 2024/25;
• the council’s values applied to the national reporting template (Appendix 1);
• a list of Regulated procurements awarded in financial year 2024/25(Appendix 2); and,
• a list of expected Regulated procurements for 2025/26 and 2026/27 (Appendix 3). 
The council are required by legislation to publish the Annual Procurement Report online
through its website and to share a copy of the report with Scottish Ministers. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Approve the content of this report;
(2) Endorse publication of the Annual Procurement Report 2024-25 on the council’s
website; and
(3) Acknowledge the requirement to share a copy of the  Annual Procurement Report
2024-25 with Scottish Ministers.  
The Plan for North Lanarkshire  
Priority  All priorities  
Ambition statement All ambition statements  
Programme of Work All Programmes of Work  
Item 9
Page 77 of 292

Page 78

1. Background 
1.1. As legislated through the Procurement Reform (Scotland) Act 2014 (the “Act”), the
council is required to prepare an Annual Procurement Report as soon as reasonably
practicable after the end of that financial year. 
1.2. The Act requires the Annual Procurement Report to include:
• a summary of the Regulated procurements that have been completed in the
previous financial year;
• a review of whether those procurements complied with the council’s procurement
strategy, and where any Regulated procurements did not comply, a statement of
how the council intends to ensure that future Regulated procurements do comply;
• a summary of any Community Benefits fulfilled from Regulated procurements;
• a summary of any steps taken to facilitate the involvement of Supported
Businesses in Regulated procurements;
• a summary of the Regulated procurements the council expects to commence in
the next two financial years; and
• such other information as the Scottish Ministers may by order specify. 
1.3. The Act requires the council to publish the Annual Procurement Report online and to
share a copy with Scottish Ministers. Scottish Ministers must prepare a report on
procurement activity in Scotland; this is generated from the Annual Procurement
Reports submitted by relevant public bodies. Scottish Ministers are required to
publish their report and lay a copy before the Scottish Parliament. 
1.4. The Act requires Scottish Ministers to publish guidance for the consistent data
gathering and preparation of annual procurement reports and procurement
strategies; this is provided in the Scottish Procurement Policy Note, SPPN 2/2025.
Website link: https://www.gov.scot/publications/public-procurement-update-annual-
procurement-reports-for-2024-2025-sppn-2-2025/. 
2. Report 
2.1. This is the council’s eighth Annual Procurement Report and covers the period 1 April
2024 to 31 March 2025. 
2.2. The relevant Procurement Strategy associated to this paper is “Procurement Strategy
2024-25”; this was approved at Finance and Resources Committee on 19 February
2024 and is published on the council website. 
Website link: Finance and Resources, Cycle 1 2024, Procurement Strategy 2024/25 
2.3. The Act sets out specific details to be covered by the Annual Procurement Report,
which are listed in bold type below, and followed by the council’s headline reporting
stats: 
2.3.1 A summary of the Regulated procurements that have been completed in the previous
financial year:
• there were 89 Regulated Procurements undertaken, with a total Agreement Value
of £2.702 Billion.
• Please refer to the Annual Procurement Report 2024/25 Appendix 2 table which
lists all Regulated procurements undertaken, including contract award values. 
Page 78 of 292

Page 79

2.3.2 A review of whether those procurements complied with the council’s Procurement
Strategy, and where any Regulated procurements did not comply, a statement of
how the council intends to ensure that future Regulated procurements do comply:
• All 89 Regulated Procurements undertaken complied with the council’s
Procurement Strategy 2024/25.
• Please refer to the Annual Procurement Report 2024/25 section 4 where further
comments are included. 
2.3.3 A summary of any community benefits fulfilled from Regulated procurements:
• It is mandatory to consider Community Benefits in Agreements over £4M; the
council undertook 23 individual Regulated procurements above £4M for which 22
of those achieved Community Benefits directly attributable for the council. 
• Please refer to the Annual Procurement Report 2024/25 section 5 and Appendix
1 item 4 which provide further details of Community Benefits achieved. 
2.3.4 A summary of any steps taken to facilitate the involvement of Supported Businesses
in Regulated procurements:
• The council procured a range of supplies and services from six Supported
Businesses (included NLI) for a total spend of £1,342,515.
• Please refer to the Annual Procurement Report 2024/25 section 6 and Appendix
1 item 7 which provide further details on spend with Supported Businesses. 
2.3.5 A summary of the Regulated procurements the council expects to commence in the
next two financial years:
• There are 211 Regulated Procurements known at this time (with an estimated
total contract value of £952 Million), which are expected to be undertaken in the
next two financial years. It is probable that additional requirements will emerge,
and procurements on the list are subject to change.
• Please refer to the Annual Procurement Report 2024/25 section 7 and Appendix
3 which provides a table of the anticipated procurements with additional details
on potential contract value and procurement route. 
2.3.6 No additional or further information was specified by Scottish Ministers for Annual
Procurement Reports 2024/25. 
2.4 For awareness, separate procurement metrics for 2024/25 will be produced for the
Local Government Benchmarking Framework and the council’s Strategic
Performance Framework (which track the council’s procurement activity over an
extensive period). As per previous years, these metrics will be reported at Finance
and Resources Cycle 4 Committee. 
3. Measures of success 
3.1  Report information fully complies with the legislative requirements set by the
Procurement Reform (Scotland) Act 2014. 
3.2 Report data fully complies with the template requirements set out in the Scottish
Procurement Policy Note, SPPN 2/2025. 
Page 79 of 292

Page 80

4. Supporting documentation 
4.1  Appendix 1 – Annual Procurement Report 2024-25 
James McKinstry
Chief Officer (Assets and Procurement) 
Page 80 of 292

Page 81

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Annual Procurement Report has been prepared in accordance with
requirements set by the Procurement Reform (Scotland) Act 2014 and supporting
guidance from Scottish Procurement Policy Note SPPN 2/2025.
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 81 of 292

Page 82

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Procurement Reform (Scotland) Act 2014 requires the publication of the
Annual Procurement Report online and a copy to be shared with Scottish Ministers.
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Failure to publish the Annual Procurement Report and/or comply with the reporting
requirements would be a breach of the Procurement Reform (Scotland) Act 2014.
The procurement risks associated to governance are managed at a corporate level.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.  
Page 82 of 292

Page 83

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 83 of 292

Page 84

APPENDIX 1
Annual
Procurement
Report 
Covering the period: 1 April 2024 to 31 March 2025 
Page 84 of 292

Page 85

1. GLOSSARY
1.1. “Community Benefits” requirements which deliver wider benefits in addition to the core
purpose of a contract. These can relate to social, economic and environmental benefits.
1.2. “Contractor” any organisation that provides Supplies, Works or Services to the Council or on
behalf of the Council.
1.3. “Living Wage” an independently calculated rate based on the cost of living and is paid
voluntarily by employers. The rate is calculated each year in November by The Resolution
Foundation on an analysis of the wage that employees need to earn in order to afford the
basket of goods required for a decent standard of living. This basket of goods includes
housing, childcare, transport and heating. The Real Living Wage is different to the UK
government’s National Living Wage which is not calculated according to what employees
need to live on.
1.4. “Procurement” the tasks and decisions which secure an external Contractor to provide what
we want, at a price that we can afford. Activity is focused on the period from prior to
advertising a tender to signing the contract. It includes both competitive tenders and
circumstances where we negotiate with a single Contractor.
1.5. “Regulated Procurements” refers to any Procurement: above £50,000 for Supplies or
Services; and above £2,000,000 for Works.
1.6. “Services” are those services that we buy including specialist support for vulnerable children
and adults, and also repairs and maintenance services, financial advice, designs and surveys
for new building works.
1.7. “SME or Small and Medium Enterprises” defined by the number of employees whereby
micro is 9 or fewer, small is 10-50, medium is 51-250.
1.8. “Supplies” items that we buy, such as pens and paper, or plants and seeds, or fruit and
vegetables.
1.9. “Sustainable Procurement” a process whereby organisations meet their needs for Supplies,
Services and Works in a way that achieves value for money and generates benefits, not only
for the organisation but also to wider society, the economy and the environment.
1.10. “Supplier Development Programme” is a public sector organisation who offer expert
training, support and information to businesses develop and compete for Contracts.
1.11. “Supported Business” are social enterprises whose main aim is to integrate disabled or
disadvantaged people socially and professionally. Their workforce must be at least 30%
disabled or disadvantaged.
Page 85 of 292

Page 86

1.12. “Third Sector” is the group name for a range of organisations including community groups,
charities, voluntary organisations, faith groups, social enterprises, community interest
companies. Third sector organisations may be registered charities and may be registered
companies. They include small, local groups and large multinational operations, and
everything in between.
1.13. “Works” is the construction works that we buy, including construction of new buildings, or
extensions, and creation and improvements to roads and bridges and open spaces. 
Page 86 of 292

Page 87

2. INTRODUCTION
2.1. North Lanarkshire Council (the “Council”) is a unitary authority, the fourth largest in
Scotland, and is responsible for the delivery of a wide and diverse range of statutory and
discretionary public services.
2.2. The Council deliver services through a mixed economy acting as both a provider, through
direct provision of services using its own workforce and assets, and an enabler with services
delivered through private Contractors, the Third Sector and Supported Businesses.
2.3. During the financial year 2024/25 the Council spent £706 Million excluding VAT on goods,
services and works to carry out our operations and delivery of public services.
2.4. The Procurement Reform (Scotland) Act 2014 (the “Act”) requires us to prepare an ‘Annual
Procurement Report’ (“APR”) on our Regulated Procurement activities as soon as reasonably
practicable after the end of each financial year.
2.5. Accordingly, we are pleased to publish our seventh APR covering the period 1 April 2024 to
31 March 2025. This reporting period is aligned to Procurement Strategy 2024/25 which is
published on the Council’s website for reference.
2.6. National guidance in the form of a procurement policy note, SPPN 2/2025, was published 12
June 2025; this provided an APR template designed to assist public bodies meet their
reporting obligations from the Act and to gather data in a consistent way. The guidance was
set out for annual procurement reports 2024/25. 
Page 87 of 292

Page 88

3. REGULATED PROCUREMENT ACTIVITY 2023/24
The Act requires the APR to provide a summary of the Council’s Regulated Procurements
that have been completed
3.1. For the reporting period 2024/25:
• 89 Regulated Procurements were undertaken that lead to contract awards being made,
o the total value of all contracts established from the Regulated Procurements was
£2.702 Billion  – this includes a mix of one-off supply and multi-year contracts. Up
to £848M (31.40%) of the total award value could be sub-contracted (based on
successful tenderer proposals). 
o 178 unique Contractors were appointed across those contract awards of which
151 (84.83%) of the unique Contractors are SME;
o the SME’s account for around £248 Million (9.20%) of the total contract award
value; and
o 75 (42.13%) of the unique Contractors are based in the North Lanarkshire Council
area and they account for around £123 Million (4.55%) of the total contract
award value.
3.2. The Council itself is committed to national guidance for Fair Work First in Procurement, and
measures are incorporated into our procurement procedures; this is evident in all our
Regulated Procurement contract awards. 1For Contracts in scope, 120 (94.49%) of unique
Contractors have committed to pay the real Living Wage, from which 45 (37.50%) are living
wage accredited.
3.3. All reporting indicators on Regulated Procurement that are requirements under the Act and
set out in a national format by SPPN 2/2025 are included at APPENDIX 1. A list of the 89
Regulated Procurements are included at APPENDIX 2.   
1 Contracts for “Transport of Pupils with Additional Support Needs” are not considered in-scope for this metric
Page 88 of 292

Page 89

4. COMPLIANCE WITH PROCUREMENT STRATEGY
The Act requires the APR to provide a review of whether the Regulated Procurements
undertaken complied with the Council’s Procurement Strategy 2024/25, and where any
Regulated Procurements did not comply, to provide a statement of how the council
intends to ensure that future Regulated Procurements do comply
4.1. The Council are reporting that all 89 Regulated Procurements undertaken during the
reporting period were in compliance with the Procurement Strategy 2024/25.
4.2. In accordance with the direction of the Procurement Strategy 2024/25, measures in place
that have full compliance include:
• all Council Procurements must be undertaken in accordance with our internal rules
General Contract Standing Orders (“GCSOs”) which set out essential requirements prior
to tendering and post tender to ensure procurement is controlled and managed
effectively, and strives to achieve best value; 
• A comprehensive procurement toolkit is in place for Regulated Procurement activity,
containing templates and supporting documents, which are aligned with the national
standards set by the Procurement Journey, ensuring that the Council are complying in
the procurement approach with the Sustainable Procurement duty, such as encouraging
commitment from our tenderers to the seven principles of Fair Work First and seeking
Community Benefit and/or social value.
• There are frequent internal audits on procurement activity and procurement procedures
to ensure compliance with GCSOs, and to support continuous improvement. 
• The Act requires public bodies to give consideration whether to incorporate Community
Benefit requirements as part of the Procurement when the estimated contract value is
greater than or equal to £4 million; the Council comply with this requirement. In
addition to this, the Council give enhanced consideration for Community Benefits for all
Regulated Procurement for Supplies or Services, and for all Works procurements greater
than £500k; this is incorporated into the pre-tender procedures.
• The Council jointly host the annual Meet the “Real” Buyer Lanarkshire with South
Lanarkshire Council, and have continued to support national events for suppliers (which
are led and organised by the Supplier Development Programme) in compliance with the
Procurement Strategy 2024/25. 
Page 89 of 292

Page 90

5. COMMUNITY BENEFITS
The Act requires the APR to provide a summary of any community benefits fulfilled from
Regulated Procurements
5.1. For the reporting period there were:
• 23 Regulated Procurements with a value of £4million or greater, for which 22 (95.65%)
achieved Community Benefits.
• 15 Regulated Procurements with a value of between £1million and £4million, for which
13 (86.67%) achieved Community Benefits.
• The overall position from the 89 Regulated Procurements undertaken was that
Community Benefits were secured from 50 (56.18%) of the contract awards made. 
5.2. It is important to give awareness that Community Benefits are not delivered on day one of a
Contract but are expected to be delivered across the contract duration (most of which have
a multi-year contract term).
5.3. All reporting indicators on Community Benefits that are requirements under the Act and set
out in a national format by SPPN 2/2025 are included at APPENDIX 1 - 4 a) to j). The Council
have included additional detailed measures in APPENDIX 1 - 4k). 
Page 90 of 292

Page 91

6. SUPPORTED BUSINESSES
The Act requires the APR to provide a summary of any steps taken to facilitate the
involvement of supported businesses in Regulated Procurements.
6.1. For all Regulated Procurements, the Council’s GCSOs and procurement toolkit ensure that
pre-tender consideration is given to contracting opportunities that are suited to the
offerings available from Supported Businesses. In the pre-tender Contract Strategy (internal
document) for each Regulated Procurement, the procuring officer must consider the
opportunity to use a Supported Businesses, and may consider the options to contract via the
National Dynamic Purchasing System (DPS) for The Provision of Requirements Reserved For
Supported Businesses. This increases the possibility to engage and work with Supported
Businesses.
6.2. Furthermore, the Council has a Supported Enterprise Service comprising ‘North Lanarkshire
Industries’ (“NLI”) who operate as a Supported Business. The Council has several contractual
agreements in place with NLI to provide a range of services including: the provision of
furniture; furniture refurbishment; removals and storage; PPE provision for homecare; and
the servicing of fire equipment. The combined value of these arrangements with NLI
amounted to a total spend of £715,111 during the APR reporting period.
6.3. The council have engaged with an additional five (5) individual Supported Businesses  during
the APR reporting period, with an aggregate spend of £627,404. The five Supported
Businesses each operate under separate categories of work (Software Developers, Security
Guards, Recycling Service Providers, Personal Care Product Suppliers, and Promotional Item
Suppliers), allowing the council to promote the range, specialism and scope of services
available from the Supported Business sector.
6.4. The total overall spend made with the six (6) Supported Businesses was £1,342,515. 
6.5. All reporting indicators on Supported Businesses that are requirements under the Act and
set out in a national format by SPPN 2/2025 are included at APPENDIX 1 - 7a) to b). 
Page 91 of 292

Page 92

7. REGULATED PROCUREMENTS EXPECTED DURING 2025/26 AND 2026/27
The Act requires the APR to provide a summary of the Regulated Procurements the Council
expects to commence in the next two financial years
7.1. As per the requirements under the Act, a full list of known Regulated Procurement expected
to be undertaken during the next two financial years are included in tabular format at
APPENDIX 3, and in summary:
• 211 Regulated Procurements are anticipated – this includes a mix of new requirements
and renewals, with a mixed range of procurement approach that include our own
tendering or procuring through collaborative frameworks.
7.2. The approximate aggregate contract value of these future Regulated Procurements is
£951,855,743; this includes one-off activities and multi-year contracts.
None of these future Regulated Procurements are guaranteed; they are subject to change
or deletion and there is scope for additional procurement requirements to emerge.  
Page 92 of 292

Page 93

APPENDIX 1: PROCUREMENT OUTCOMES
1. REPORT PARAMETERS
1.1. The following report information in parts 2-9 match the template provided through SPPN
2/2025; these indicators are required to conform with the requirements of the Act.
2. SUMMARY OF REGULATED PROCUREMENTS COMPLETED
Ref Metric 2024/25
2a) Total number of regulated contracts awarded within the report
period 89
2b) Total value of regulated contracts awarded within the report
period £2,701,736,574
2c)
Total number of unique suppliers awarded a place on a regulated
contract awarded during the period 178
i) how many of these unique suppliers are SMEs 151
ii) how many of these unique suppliers are Third sector bodies 16 
3. REVIEW OF REGULATED PROCUREMENTS COMPLIANCE
Ref Metric 2024/25
3a) Number of regulated contracts awarded within the period that
complied with your Procurement Strategy 89
3b) Number of regulated contracts awarded within the period that did
not comply with your Procurement Strategy 0 
4. COMMUNITY BENEFIT REQUIREMENTS SUMMARY 
Use of Community Benefit Requirements in Procurement:
Ref Metric 2024/25
4a) Total Number of regulated contracts awarded with a value of £4
million or greater. 23
4b) Total Number of regulated contracts awarded with a value of £4
million or greater that contain Community Benefit Requirements. 22
4c) Total Number of regulated contracts awarded with a value of less
than £4 million that contain Community Benefit Requirements 28 
Page 93 of 292

Page 94

Key Contract Information on community benefit requirements imposed as part of a Regulated
Procurement that were fulfilled during the period: 
Ref Metric 2024/25
4d) Number of Jobs Filled by Priority Groups (Each contracting
authority sets its own priority groups) 26 posts
4e) Number of Apprenticeships Filled by Priority Groups 16 posts
4f) Number of Work Placements for Priority Groups zero
4g) Number of Qualifications Achieved Through Training by Priority
Groups zero
4h) Total Value of contracts sub-contracted to SMEs
£848M (31.40%) of
the 
total Contract Award
Value has been
indicated for
potential sub-
contracting over the
contract term; this is
not broken down by
business type.
4i) Total Value of contracts sub-contracted to Social Enterprises
4j) Total Value of contracts sub-contracted to Supported Businesses 
Other Community Benefits Fulfilled:
Ref Theme Benefit Category 2024/25 Outcome
4k)
1.Community
Engagement
1.1 Financial Support for a Community Project /
Organisation (minimum of £1k per project)
35 projects
1.2 Non-financial Support for a Community Project
/ Organisation (days of support)
38 days
2. Education
based Skills
and Training
2.1 MCR Pathways 1-2-1 Mentoring Programme (or
equivalent Programme)
7 programmes
2.2 Work Experience Placement for an individual
aged 14 to 16 years of age
20 work placements
2.3 Work Experience Placement to obtain a
"Foundation Apprenticeship"
0 work placements  
Page 94 of 292

Page 95

3. Education
based
Support and
Development
3.1 Educational Sponsorship 2 sponsorships
3.2 Educational Support and Skills Transfer 7 sessions
3.3 Educational Visits 22 school visits
3.4 Educational Workplace Visit 12 workplace visits
4. Supply
Chain
Development
4.1 Business Event / Briefing to promote supply
chain opportunities
19 events
4.2 Business Mentoring and Advice to support to
an SME / Social Enterprise / Voluntary
organisation
11 events
4.3 New Job for a Graduate from a Priority Group 1 post
4.4 New Job for a Graduate not from a Priority
Group
1 post
4.5 New Job for an Individual not from a Priority
Group
15 posts
4.6 Work Experience Placement for an
individual16+ years of age
33 work placements 
5. FAIR WORK AND THE REAL LIVING WAGE
Ref Metric 2024/25
5a) Number of regulated contracts awarded during the period that
included a Fair Work First criterion.
285
5b)
Number of unique suppliers who have committed to pay the real
Living Wage in the delivery of a regulated contract awarded during
the period.
120
5c)
Number of unique suppliers who are accredited Living Wage
employers and were awarded a regulated contract during the
period.
45 
2 Contracts for “Transport of Pupils with Additional Support Needs” are considered out of scope for this metric
Page 95 of 292

Page 96

6. PAYMENT PERFORMANCE
Ref Metric 2024/25
6a) Number of valid invoices received during the reporting period. 294,629
6b) Percentage of invoices paid on time during the period (“On time”
means within the time period set out in the contract terms.) 91.90%
6c)
Number of regulated contracts awarded during the period
containing a contract term requiring the prompt payment of
invoices in public contract supply chains.
89
6d) Number of concerns raised by sub-contractors about the timely
payment of invoices within the supply chain of public contracts. zero 
7. SUPPORTED BUSINESSES SUMMARY
Ref Metric 2024/25
7a) Total number of regulated contracts awarded to supported
businesses during the period 1
7b) Total spend with supported businesses during the period covered
by the report, including: £1,342,515
i) spend within the reporting year on regulated contracts  £221,851
ii) spend within the reporting year on non-regulated contracts  £1,120,664 
Page 96 of 292

Page 97

8. SPEND AND SAVINGS SUMMARY
The below table of information provides the general Council expenditure during 2024/25 alone i.e.
money spent on goods, services and works to carry out our operations and delivery of public
services.
Ref Metric 2024/25
8a) Total procurement spend for the period covered by the annual
procurement report. £706,470,889
8b) Total procurement spend with SMEs during the period covered by
the annual procurement report. £274,263,981
8c) Total procurement spend with third sector bodies during the
period covered by the report. £75,724,026
8d) Percentage of total procurement spend through collaborative
contracts. 34.70%
8e)
3Total delivered cash savings for the period covered by the annual
procurement report £281,867
8f) Total non-cash savings value for the period covered by the annual
procurement report £183,014 
9. FUTURE REGULATED PROCUREMENTS
The below table of information provides the totals for expected Regulated Procurements in 2025/26
and 2026/27, which are listed individually at Appendix 3.
Ref Metric 2024/25
9a) Total number of regulated procurements expected to commence
in the next two financial years 211
9b) Total estimated value of regulated procurements expected to
commence in the next two financial years. £951,855,743 
3 8e) and 8f) are based on SPPN 2/2025 Annex A annual procurement report template
Page 97 of 292

Page 98

APPENDIX 2: REGULATED PROCUREMENTS – COMPLETED 2024/25 
DATE OF
AWARD CONTRACT  TITLE NAME OF THE CONTRACTOR(S) VALUE OF THE
CONTRACT
CONTRACT
START DATE
CONTRACT END
DATE INCL.
EXTENSION
24/04/2024 M365 BACK UP SOLUTION SOFTCAT (UK) PLC £200,000 01/05/2024 30/04/2027
02/05/2024 MTC FOR SERVICING AND MAINTENANCE OF SWIMMING / HYDROTHERAPY
POOLS AND ANCILLARY EQUIPMENT 2024 – 2026 AQUATEQ POOLS LIMITED £350,000 16/05/2024 15/05/2025
22/05/2024 ENTERPRISE PROJECT - HOUSING AND CORPORATE SERVICES MEARS LIMITED £1,800,000,000 01/07/2024 30/06/2036
24/05/2024 PROVISION OF A CORPORATE BOOKING SYSTEM GLADSTONE MRM LIMITED £3,000,000 03/06/2024 02/06/2031
24/05/2024 SUPPLY & DISTRIBUTION OF GROCERIES & PROVISIONS  BRAKE BROS LIMITED £6,000,000 08/06/2024 30/06/2026
28/05/2024 PROVISION OF UNIFIED COMMUNICATIONS VIRGIN MEDIA 02 BUSINESS £4,323,000 02/04/2024 01/04/2029
04/06/2024 PATHER FARM, WISHAW – CEMETERY DEVELOPMENT TILBURY DOUGLAS CONSTRUCTION LIMITED £3,746,763 01/06/2024 01/04/2025
04/06/2024 PROVISION OF COMMUNITY LIVING SUPPORT  NEIGHBOURHOOD NETWORKS £1,209,960 04/06/2024 03/06/2027
06/06/2024 REMOVAL, STORAGE, REDISTRIBUTION AND DISPOSAL SERVICES 2024-26 KELERBAY LIMITED T/A DOREE BONNER
INTERNATIONAL £450,000 21/06/2024 20/06/2027
25/06/2024 TREASURY MANAGEMENT ADVISORY SERVICES (2024-2027) ARLINGCLOSE LIMITED £87,000 01/07/2024 30/06/2028
Page 98 of 292

Page 99

28/06/2024 BRIDGE INSPECTIONS 2024-2025 ATKINSREALIS LIMITED. £740,174 01/07/2024 31/03/2025
03/07/2024 ROAD CORING 2024-28 STANGER TESTING SERVICES LIMITED £175,535 08/07/2024 07/06/2028
05/07/2024 SUPPLY OF BUILDING CLEANING EQUIPMENT  DMG FLOORCARE LIMITED £475,000 24/07/2024 23/07/2029
08/07/2024 MTC FOR WINDOW & DOORS REPLACEMENT 2024 -2025 SIDEY SOLUTIONS LIMITED £2,000,000 09/07/2024 04/04/2025
11/07/2024 ENVIRONMENTAL SENSORS IOPT LIMITED £102,000 01/07/2024 30/06/2025
18/07/2024 CUMBERNAULD TOWN CENTRE - ASSET MANAGEMENT 2024 - 2025 2 DIFFERENT CONTRACTORS APPOINTED £125,000 01/07/2024 30/09/2025
18/07/2024 CUMBERNAULD TOWN CENTRE - PROPERTY MANAGEMENT 2024- 2025 GATEHOUSE PROPERTY MANAGEMENT LIMITED £205,000 01/07/2024 30/09/2025
23/07/2024 PURCHASE OF 5 TRACTORS HAMILTON BROS (ENGINEERING) LIMITED £325,000 24/07/2024 31/03/2025
08/08/2024 TREATMENT & DISPOSAL OF WASTE UPHOLSTERED DOMESTIC SEATING
CONTAINING PERSISTENT ORGANIC POLLUTANTS (POPS) DOW GROUP LIMITED £476,000 02/09/2024 13/10/2025
12/08/2024 ENTERPRISE PROJECT - ROADS AND RELATED SERVICES: MAINTENANCE &
IMPROVEMENT HOCHTIEF PPP SOLUTIONS GMBH £450,000,000 01/10/2024 30/09/2036
12/08/2024 FRAMEWORK FOR SERVICES LINKED TO SCOTTISH ATTAINMENT CHALLENGE
(SAC) AND PUPIL EQUITY FUND (PEF) (ENTRY POINT 3)  38 DIFFERENT CONTRACTORS APPOINTED £16,000,000 01/09/2024 08/01/2027
28/08/2024 SUPPLY AND DELIVERY OF JANITORIAL PRODUCTS ARROW COUNTY SUPPLIES LIMITED £5,500,000 16/09/2024 31/07/2028
Page 99 of 292

Page 100

06/09/2024 DESIGN AND BUILD DEVELOPMENT AGREEMENT FOR THE CONSTRUCTION
OF ST KEVIN'S COMMUNITY HUB HUB SOUTH WEST SCOTLAND LIMITED £17,554,196 06/09/2024 16/02/2026
06/09/2024 NEURODEVELOPMENTAL FAMILY SUPPORT NORTH LANARKSHIRE CARERS TOGETHER £499,000 09/09/2024 31/03/2027
16/09/2024 NEC4 CONTRACT MANAGEMENT SOLUTION  SOFTCAT PLC £407,258 16/09/2024 15/09/2028
18/09/2024 NORTH LANARKSHIRE HOMES FIRST FLEXIBLE SUPPORT SIMON COMMUNITY SCOTLAND £878,632 01/02/2025 31/03/2028
18/09/2024 KILSYTH SURFACE WATER MANAGEMENT PLAN ATKINSRÉALIS UK LIMITED £65,489 30/09/2024 12/05/2025
19/09/2024 NEW BUILD SOCIAL HOUSING AT FORMER COLUMBA HIGH SCHOOL SITE,
COATBRIDGE CCG (SCOTLAND) LIMITED £26,843,806 23/09/2024 30/09/2028
20/09/2024 DEMOLITION ENGINEER  PERSES LIMITED  £1,000,000 30/08/2024 28/02/2026
26/09/2024 PROVISION OF CASH COLLECTION SERVICES 2024/25 SECURITY PLUS LIMITED £107,000 01/10/2024 30/09/2025
02/10/2024 BEFRIENDING SERVICE NORTH LANARKSHIRE  COMMUNITY VOLUNTEERS ENABLING YOU LIMITED £361,596 01/10/2024 30/09/2027
03/10/2024 APPOINTMENT OF LIFT CONSULTANT FOR LIFT REPLACEMENT WORKS
PHASE 4 AND PHASE 5 TUV SUD LIMITED £51,240 14/10/2024 27/07/2027
04/10/2024 NEW BUILD SOCIAL HOUSING AT THORN ROAD, BELLSHILL MCTAGGART CONSTRUCTION LIMITED £5,961,318 07/10/2024 02/02/2026
16/10/2024
PROVISION OF RETROFIT AND CONTRACTOR DESIGN APPRAISAL
CONSULTANCY SERVICES FOR RE-ROOFING, RE-RENDERING & ENERGY
EFFICIENCY WORKS 
ECD ARCHITECTS LIMITED £3,200,000 16/10/2024 15/10/2029
Page 100 of 292

Page 101

21/10/2024 IT & TECHNOLOGY RELATED ELECTRICAL WASTE DISPOSAL RE-TEK UK LIMITED Zero 01/11/2024 31/10/2031
22/10/2024 THE CENTRE CUMBERNAULD - MAST DEVELOPMENT PROPOSALS MAST ARCHITECTS £125,700 21/10/2024 20/10/2027
06/11/2024 ENGAGE PROCESS MODELLER ENGAGE PROCESS UK LIMITED £87,220 06/11/2024 07/11/2027
06/11/2024 INTELLIGENT EMAIL SECURITY (DEFEND AND PREVENT) EGRESS SOFTWARE TECHNOLOGIES LIMITED £228,000 05/11/2024 03/11/2026
07/11/2024 DIGITAL ROAD CONDITION MANAGEMENT SOLUTION SOFTCAT PLC £150,000 01/10/2024 30/09/2027
08/11/2024 RECOVER NL PROGRAMME PITCH UPGRADES - (HARTHILL, CLEALAND &
MOODIESBURN) HUB SOUTH WEST SCOTLAND LIMITED £3,048,709 08/11/2024 29/03/2025
22/11/2024 EUROCENTRAL STRATEGIC ACTIVE TRAVEL PHASE 1 AND 2 DETAILED
DESIGN, PHASE 3 OPTIONS APPRAISAL AND CONCEPT DESIGN STANTEC UK LIMITED  £239,725 19/11/2024 21/05/2027
29/11/2024 MTC FOR RE-ROOFING, RE-RENDERING AND INSULATON WORKS 2024 -
2028 (HO RF 23 052) 3 DIFFERENT CONTRACTORS APPOINTED £99,000,000 02/12/2024 01/12/2029
29/11/2024 MTC FOR FULL GAS HEATING INSTALLATIONS; 2025-2029 (HO HT 24 033) 2 DIFFERENT CONTRACTORS APPOINTED £40,000,000 22/01/2025 21/01/2029
29/11/2024 MTC FOR WINDOW & DOOR REPLACEMENTS 2025 -2028 (HO WN 24 027) 2 DIFFERENT CONTRACTORS APPOINTED £45,000,000 22/01/2025 21/01/2029
29/11/2024 ANNUAL HOSTED JOB MANAGER AND LICENCES (2024-2025) ADVANCED BUSINESS SOFTWARE & SOLUTIONS
LIMITED £99,063 02/12/2024 01/12/2025
03/12/2024 COATBRIDGE; PROPOSED DEVELOPMENT OF EXISTING CARNBROE PRIMARY
SCHOOL CLARK CONTRACTS £1,698,882 16/01/2025 28/08/2025
Page 101 of 292

Page 102

04/12/2024 PROVISION OF SANITARY PRODUCTS FAST AID PRODUCTS LIMITED £450,000 05/12/2024 04/12/2028
09/12/2024 HOUSING & ASSET MANAGEMENT SOLUTION CIVICA UK LIMITED £2,500,000 02/12/2024 01/12/2036
11/12/2024 PROVISION OF DOMESTIC FURNITURE & FURNISHINGS 2024 - 2027 CF SERVICES LIMITED £15,173,974 13/01/2025 12/01/2028
17/12/2024 ADVOCACY SERVICES  EQUAL SAY LIMITED £3,507,405 03/03/2025 01/03/2030
17/12/2024 SUPPORT FOR UNPAID CARERS AND YOUNG CARERS 5 DIFFERENT CONTRACTORS APPOINTED £16,380,000 03/03/2025 28/02/2031
18/12/2024 DESIGN AND BUILD OF GARTCOSH COMMUNITY HUB HUB SOUTH WEST SCOTLAND LIMITED £31,720,935 18/12/2024 24/08/2026
18/12/2024 NEW BUILD SOCIAL HOUSING AT LABURNUM ROAD, VIEWPARK CCG (SCOTLAND) LIMITED £6,301,325 18/12/2024 01/10/2027
19/12/2024 JACKSON COURT DEMOLITION  DEM-MASTER DEMOLITION LIMITED £4,989,490 06/01/2025 05/03/2026
20/12/2024 RAVENSCRAIG ACCESS INFRASTRUCTURE SOUTH - VALUE ENGINEERING
REVIEW  ATKINSREALIS  £157,942 23/12/2024 14/07/2025
20/12/2024 CIVICA UK LIMITED, LICENCE, SUPPORT AND MAINTENANCE SCHEDULE FOR
3 YEARS 2025-28 CIVICA UK LIMITED £226,000 01/04/2025 31/03/2028
06/01/2025 DIRECT PAYMENT SERVICE GCFIL £415,778 06/01/2025 05/01/2028
17/01/2025 MENTAL HEALTH PEER SUPPORT AND SHORT TERM MENTAL HEALTH
SUPPORT SERVICE  SAMH £3,081,204 01/02/2025 31/01/2029
Page 102 of 292

Page 103

31/01/2025 CONVERSION OF OLD MOTHERWELL TOWN HALL TO SOCIAL HOUSING CLARK CONTRACTS LIMITED £5,856,023 31/01/2025 09/07/2027
31/01/2025 CORPORATE WEB FILTERING SOLUTION SOFTCATC PLC £498,984 01/03/2025 29/02/2028
31/01/2025 ENTERPRISE PROJECT - EXTERNAL ADVISOR APPOINTMENT (3RD GEN) TURNER & TOWNSEND COST MANAGEMENT LIMITED £450,000 03/02/2025 02/02/2028
14/02/2025 COMMUNITY ALARM DIGITAL DEVICES LEGRAND ELECTRIC LIMITED £494,846 17/02/2025 31/03/2025
17/02/2025 GARDEN ASSISTANCE SCHEME & AD HOC GARDEN WORKS 2025 - 2028 5 DIFFERENT CONTRACTORS APPOINTED £5,750,000 10/03/2025 09/03/2029
26/02/2025 PROVISION OF MICROSOFT ENTERPRISE AGREEMENT 2025-2028 PHOENIX SOFTWARE LIMITED £10,883,000 01/04/2025 31/03/2028
26/02/2025 PROVISION OF A SHARED ALARM RECEIVING CENTRE (ARC) TECHNOLOGY
SOLUTION CHUBB FIRE & SECURITY LIMITED £412,183 03/03/2025 02/03/2031
27/02/2025 STRATEGIC SUPPORT SERVICES FOR GLENBOIG COMMUNITY HUB
FEASIBILITY STUDY / MASTERPLAN HUB SOUTH WEST SCOTLAND LIMITED £153,146 11/02/2025 17/06/2025
27/02/2025 PURCHASE OF 20 X SMALL PANEL VANS 2 DIFFERENT CONTRACTORS APPOINTED £366,503 01/03/2025 31/03/2025
28/02/2025 MULTI AGENCY RISK ASSESSMENT CONFERENCE (MARAC) WOMEN’S AID SOUTH LANARKSHIRE AND EAST
RENFREWSHIRE (WASLER) £223,912 01/07/2024 30/06/2027
03/03/2025 ADVOCACY SERVICE CHILDREN & YOUNG PEOPLE WHO CARES SCOTLAND  £241,000 03/03/2025 28/02/2026
03/03/2025 WISHAW, EDWARD LAWSON CENTRE - RECOVERY PROJECT PROCAST BUILDING CONTRACTORS LIMITED £2,839,320 31/01/2025 06/06/2025
Page 103 of 292

Page 104

03/03/2025 PURCHASE OF 3 COMPACTORS BERGMANN DIRECT LIMITED £57,696 03/03/2025 31/03/2025
05/03/2025 PROVISION OF SUPPORT FOR PEOPLE AFFECTED BY HUNTINGTON’S DISEASE SCOTTISH HUNTINGTON’S ASSOCIATION  £398,898 01/04/2025 31/03/2028
06/03/2025 BUSINESS SUPPORT AND EXPERT HELP SERVICES 2025 – 2029 26 DIFFERENT CONTRACTORS APPOINTED £1,400,000 01/04/2025 31/03/2029
07/03/2025 PROVISION OF INFORMATION AND ADVICE SERVICE (AUTISM) HOPE FOR AUTISM £62,500 01/04/2025 30/09/2025
12/03/2025 DEMOLITION OF ALLAN, COURSINGTON & DRAFFEN TOWERS  THOMPSONS OF PRUDHOE LIMITED  £5,695,170 12/03/2025 11/03/2026
13/03/2025 SUPPLY AND DELIVERY OF FRESH FRUIT AND VEGETABLES GEORGE CARRUTHERS & SONS LIMITED £2,423,598 01/04/2025 31/03/2029
17/03/2025 PURCHASE OF REFRIGERATION CATERING EQUIPMENT MERCHANT CITY REFRIGERATION (SCOTLAND) LIMITED £480,000 17/03/2025 30/06/2027
19/03/2025 PROVISION OF CONTRACT PROGRESS ANALYST/PROGRAMMERS  HARVEY NASH LIMITED £485,000 03/04/2025 02/04/2027
20/03/2025 DOMESTIC ABUSE SACRO £1,384,492 02/06/2025 31/05/2029
20/03/2025 CONTINUATION OF ESRI GIS CONTRACT ESRI (UK) LIMITED £91,905 01/04/2025 31/03/2026
25/03/2025 NEW BUILD SOCIAL HOUSING COSHNEUK ROAD, MILLERSTON JR CONSTRUCTION (SCOTLAND) LIMITED £4,291,649 07/04/2025 01/06/2026
25/03/2025 NEW BUILD SOCIAL HOUSING AT DUNOTTAR AVENUE, SHAWHEAD,
COATBRIDGE CCG (SCOTLAND) LIMITED £23,716,921 07/04/2025 14/07/2027
Page 104 of 292

Page 105

27/03/2025 AP EXPORT INTERFACE DEVELOPMENT & SUPPORT 2024-28 (ELCOM
INTEGRATION SERVICE) INTEGRELLA LIMITED £89,102 05/11/2024 04/11/2028
27/03/2025 ASSISTIVE TECHNOLOGY CLIENT SUPPORT SERVICES & MAINTENANCE ACCESS TEHNOLOGY COMPANY (ATC) £468,000 01/04/2025 31/03/2027
27/03/2025 PROVISION OF PROGRESS MAINTENANCE AND SUPPORT 2025-27 PROGRESS SOFTWARE LIMITED. £198,000 01/04/2025 31/03/2027
25/05/2024
DPS MINI COMPETITIONS FOR PROVISION OF TRANSPORT OF PUPILS WITH
ADDITIONAL SUPPORT NEEDS COMMENCING ACADEMIC YEAR 2024/25 –
BATCH 1
AWARDS LISTED ON THE COUNCIL WEBSITE £3,111,288 01/08/2024 30/06/2025
31/05/2024
DPS MINI COMPETITIONS FOR PROVISION OF TRANSPORT OF PUPILS WITH
ADDITIONAL SUPPORT NEEDS COMMENCING ACADEMIC YEAR 2024/25 –
BATCH 2
AWARDS LISTED ON THE COUNCIL WEBSITE £1,081,765 01/08/2024 30/06/2025
12/07/2024
DPS MINI COMPETITIONS FOR PROVISION OF TRANSPORT OF PUPILS WITH
ADDITIONAL SUPPORT NEEDS COMMENCING ACADEMIC YEAR 2024/25 –
BATCH 3
AWARDS LISTED ON THE COUNCIL WEBSITE £805,454 01/08/2024 30/06/2025
29/07/2024
DPS MINI COMPETITIONS FOR PROVISION OF TRANSPORT OF PUPILS WITH
ADDITIONAL SUPPORT NEEDS COMMENCING ACADEMIC YEAR 2024/25 –
BATCH 4
AWARDS LISTED ON THE COUNCIL WEBSITE £324,900 01/08/2024 30/06/2025 
Page 105 of 292

Page 106

APPENDIX 3: REGULATED PROCUREMENTS – PLANNED 2025/26 AND 2026/27 
REQUIREMENT TITLE ESTIMATED VALUE /
BUDGET
ANTICIPATED
PROCUREMENT START
DATE
ANTICIPATED CONTRACT
START DATE
PROPOSED ROUTE TO
MARKET
TRANSPORT FOR ASN PUPILS 2025 / 26 £6,000,000 APR 25 AUG 25
CALL-OFF FROM
COUNCIL
FRAMEWORK / DPS
TEMPORARY HOUSING BROADBAND SERVICE £1,000,000 APR 25 JUN 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SUPPLY OF CREWCAB VANS AND TIPPERS £627,000 APR 25 JUN 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
PROVISION OF CLOUD RECORDS MANAGEMENT SOFTWARE £180,000 APR 25 AUG 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
PROVISION OF WOODLAND AND FORESTRY SITE AUDITS £50,000 APR 25 SEP 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
PROVISION OF LOCAL DEVELOPMENT PLANNING CONSULTANCY SUPPORT £300,000 APR 25 SEP 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
PROVISION OF MULTI FUNCTION DEVICE (MFD) MANAGED PRINT SERVICES £2,535,210 APR 25 SEP 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
MANAGEMENT SERVICES FOR THE CENTRE CUMBERNAULD £2,350,000 APR 25 JAN 26 OPEN PROCEDURE
PROVISION OF CASH COLLECTION SERVICES £400,000 APR 25 OCT 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
CONTRACTOR MANAGEMENT / DESIGN TEAM SERVICES - CUMBERNAULD VILLAGE £75,000 APR 25 JUL 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
Page 106 of 292

Page 107

PROVISION OF PANTHEON WEBSITE HOSTING £110,000 APR 25 SEP 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
SUPPLY OF OFFICE FURNITURE  £1,000,000 APR 25 SEP 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
REFURBISHMENT OF LANARK COUNTY COUNCIL STYLE HOUSING £5,880,000 MAY 25 DEC 25 OPEN PROCEDURE
GROUND INVESTIGATIONS AT PALACERIGG £480,000 MAY 25 AUG 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
PROVISION OF A BUILDING SURVEYING CONSULTANCY (BUILDINGS OVER 11M HIGH) £250,000 MAY 25 AUG 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
MOTHERWELL STATION ACTIVE TRAVEL LINKS PHASE 2 DETAILED DESIGN AND TENDER
PREPARATION  £200,000 MAY 25 AUG 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SURVEYS FOR COMMON AREA REWIRES £250,000 MAY 25 AUG 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
CONSULTANT SERVICES FOR "OTHER TIMBERS" HOUSING PROJECT £100,000 MAY 25 OCT 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
SUPPLY OF SIGNAGE (CORPORATE) £50,000 MAY 25 OCT 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
SIGNAGE FOR HOUSEHOLD WASTE RECYCLING CENTRES  £80,000 MAY 25 NOV 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
FRAMEWORK AGREEMENT FOR THE DEMOLITION AND DECONSTRUCTION OF HIGH-RISE
RESIDENTIAL AND COMPLEX BUILDINGS £150,000,000 MAY 25 NOV 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
Page 107 of 292

Page 108

PROJECT MANAGER, QUANTITY SURVEYOR, PRINCIPAL DESIGNER SERVICES FOR GLENBOIG
COMMUNITY HUB £700,000 MAY 25 JAN 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
INDEPENDENT TESTER AND COMPLIANCE MONITOR SERVICES FOR GLENBOIG COMMUNITY
HUB £200,000 MAY 25 JAN 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
WESTFIELD PRIMARY SCHOOL MUGA PITCH £200,000 MAY 25 OCT 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
MONKLANDS CANAL IMPROVEMENTS FEASIBILITY STUDY £50,000 MAY 25 AUG 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
IMPROVED LINKAGES BETWEEN KEY ASSETS IN COATBRIDGE FEASIBILITY STUDY  £50,000 MAY 25 AUG 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SUPPLY OF 4X4 VEHICLE £50,000 MAY 25 AUG 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
CONSULTANT - CIVICA IMPLEMENTATION SUPPORT £100,000 MAY 25 AUG 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SUPPLY OF 32 SEAT MINIBUSES £2,160,000 MAY 25 SEP 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
BLACKBURN HOUSING CONSULTANCY £320,000 MAY 25 NOV 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SUPPLY OF 17 SEAT ACCESSIBLE MINI BUS  £400,000 MAY 25 OCT 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS 
BULKY WASTE MATERIAL (INCLUDING POPS) FROM HOUSEHOLD WASTE RECYCLING
CENTRES, SPECIAL UPLIFTS, FLYTIPPING AND HOUSING £11,500,000 MAY 25 OCT 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
Page 108 of 292

Page 109

DISPOSAL AND TREATMENT OF KERBSIDE COLLECTED PAPER AND CARD WASTE £450,000 MAY 25 OCT 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
STRATHCLYDE PARK WATERSPORTS CENTRE REDEVELOPMENT MAIN WORKS PACKAGE £11,000,000 JUN 25 JAN 27 HUB SOUTH WEST
ALLERSHAW TOWER DEMOLITION £2,000,000 JUN 25 DEC 25 OPEN PROCEDURE
PROVISION OF WINDOW AND GLAZING CLEANING £300,000 JUN 25 JAN 26 OPEN PROCEDURE
SUPPLY OF 18T ROAD SWEEPERS £390,000 JUN 25 AUG 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SUPPLY OF ELECTRIC CARS £127,181 JUN 25 AUG 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SUPPLY OF CRANE OPERATED TRUCK £120,000 JUN 25 AUG 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SUPPLY OF HOOK LOADER TRUCK £240,000 JUN 25 AUG 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SUPPLY OF PRECINCT SWEEPERS  £240,000 JUN 25 AUG 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
UPGRADE OF SPRINKLERS PHASE 4  £1,500,000 JUN 25 FEB 26 OPEN PROCEDURE
RESPONSIVE WHOLE FAMILY SUPPORT FOR COMPLEX NEEDS (PLAYPEACE) £236,749 JUN 25 SEP 25
H&SRS AWARD
WITHOUT
COMPETITION
MTC FOR CONTROLLED DOOR ENTRY SYSTEM REPLACEMENTS £6,000,000 JUN 25 JAN 26 OPEN PROCEDURE
Page 109 of 292

Page 110

EUROCENTRAL STRATEGIC ACTIVE TRAVEL LINKS PHASE 1 AND 2  £2,000,000 JUN 25 DEC 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
MTC FOR ELECTRIC HEATING REPLACEMENT £2,000,000 JUN 25 SEP 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SKIP SERVICE AND REPAIR £150,000 JUN 25 JAN 26 OPEN PROCEDURE
GLENBOIG LINK ROAD ADDITIONAL ECOLOGICAL MONITORING  £50,000 JUN 25 SEP 25 NEGOTIATED
PROCEDURE
SHELTERED HOUSING PHASE 3 - DESIGN TEAM APPOINTMENT  £180,000 JUN 25 NOV 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
REFURBISHMENT OF BLACKBURN STYLE HOMES £5,500,000 JUL 25 FEB 26 OPEN PROCEDURE
SOLUTIONS FOR ASN PUPILS: EQUIPMENT AND ADAPTATIONS £504,000 JUL 25 FEB 26 OPEN PROCEDURE
PLAY AREAS - MOODIESBURN, BARGEDDIE AND EASTFIELD £300,000 JUL 25 NOV 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
PLAY AREAS - CALDERCRUIX, FORGEWOOD, PETERSBURN AND RENNIE ROAD £430,000 JUL 25 NOV 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
PLAY AREAS SPRING - CAMBUSNETHAN & WAVERLEY DRIVE, CAMBUSNETHAN, JERVISTON
AND GREEN END £400,000 JUL 25 NOV 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
OUTDOOR GYMS - AUCHINLOCH AND CARDOWAN MEADOW £70,000 JUL 25 NOV 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
SUPPLY OF 26T REFUSE COLLECTION VEHICLES £1,290,000 JUL 25 SEP 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
Page 110 of 292

Page 111

PROVISION OF ADOBE ACROBAT LICENSING £171,000 JUL 25 OCT 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
PROVISION OF UTILITIES (ELECTRICITY, GAS, AND WATER) £150,000,000 JUL 25 OCT 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
MTC FOR LOFT, UNDERFLOOR AND CAVITY WALL INSULATIONS £2,000,000 JUL 25 SEP 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
PROFESSIONAL PROPERTY CONSULTANCY SERVICE £475,000 JUL 25 FEB 26 OPEN PROCEDURE
REFURBISHMENT OF 2NO TOWER BLOCKS; WHIFFLET AND CALDER COURT, COATBRIDGE £19,500,000 JUL 25 NOV 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
INDEPENDENT AUDITING SERVICES FOR ELECTRICAL WORKS £80,000 JUL 25 MAY 26 OPEN PROCEDURE
EUROCENTRAL STRATEGIC ACTIVE TRAVEL LINKS PHASE 3 DETAILED DESIGN AND TENDER
PREPARATION  £100,000 JUL 25 DEC 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
SERVICENOW SOLUTION (SUPPORT, PLATFORM MANAGEMENT AND ARCHITECTURAL
SUPPORT)  £350,000 JUL 25 DEC 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
REVENUES AND BENEFITS WORKFLOW SYSTEM £325,000 JUL 25 DEC 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
PROVISION OF SERVICENOW (SNOW SUPPORT)  £577,000 JUL 25 DEC 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
SUPPLY OF 30 X 40 CUBIC YARD SKIPS £210,000 JUL 25 DEC 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
SUPPLY OF WORKWEAR, FOOTWEAR AND PPE  £1,000,000 JUL 25 JAN 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
Page 111 of 292

Page 112

CONVERSION OF KILDONAN ST MUNICIPAL BUILDINGS TO SOCIAL HOUSING AND OFFICES £17,500,000 JUL 25 JAN 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
DUNBETH / HIGH COATS & MAXTON DEMOLITION SITE INVESTIGATIONS £100,000 JUL 25 SEP 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
PROJECT MANAGER, QUANTITY SURVEYING AND PRINCIPAL DESIGNER SERVICES FOR
GLENBOIG COMMUNITY HUB £1,500,000 JUL 25 OCT 25 NEGOTIATED
PROCEDURE
SUPPLY OF CATERING SUNDRIES £1,920,000 JUL 25 NOV 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
ADVOCACY SERVICE CHILDREN'S AND YOUNG PEOPLE £900,000 AUG 25 MAR 26 OPEN PROCEDURE
NORTH LANARKSHIRE ADULT AND YOUNG CARER SUPPORT SERVICES £50,000 AUG 25 MAR 26 OPEN PROCEDURE
SUPPLY OF BAKERY PRODUCTS (BREAD, ROLLS, CAKES AND CONFECTIONERY) £250,000 AUG 25 APR 26 OPEN PROCEDURE
SHERIFF OFFICER SERVICES £800,000 AUG 25 APR 26 OPEN PROCEDURE
THE HIVE - MANAGEMENT SERVICES £100,000 AUG 25 APR 26 OPEN PROCEDURE
PLAYPARK EQUIPMENT REPAIRS £200,000 AUG 25 NOV 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
DUNBETH COURT DEMOLITION £8,000,000 AUG 25 NOV 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
RESILIENCE SOFTWARE £58,000 AUG 25 NOV 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SUPPLY OF RIDE ON LAWN MOWERS £132,000 AUG 25 NOV 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
Page 112 of 292

Page 113

SUPPLY OF RIDE ON LAWN MOWERS £180,600 AUG 25 NOV 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SUPPLY OF RIDE ON LAWN MOWERS £197,460 AUG 25 NOV 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
PAYMENT PROCESSING SERVICES £100,000 AUG 25 NOV 25 NEGOTIATED
PROCEDURE
ROUTING AND IN-CAB SOLUTIONS (WASTE AND LAND) £250,000 AUG 25 JAN 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
IT CABLING £487,000 AUG 25 MAR 26 OPEN PROCEDURE
BARGEDDIE CROSS - JUNCTION IMPROVEMENTS £2,000,000 AUG 25 JAN 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
MAINTENANCE AND REPAIR OF BUILDING CLEANING EQUIPMENT £1,350,000 AUG 25 FEB 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
SUPPLY AND FIT OF TYRES (INCLUDING ASSOCIATED SERVICES) FOR VEHICLES AND PLANT £330,000 AUG 25 NOV 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
PROVISION OF ROUTING WITH ASSOCIATED IN-CAB AND HANDHELD SOLUTION £188,000 AUG 25 NOV 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
RECYCLING OF SCRAP METAL FROM HOUSEHOLD WASTE RECYCLING CENTRES £0 AUG 25 JAN 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
CUMBERNAULD MASTERPLAN DESIGN TEAM £500,000 AUG 25 JAN 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
CONFIDENTIAL WASTE DISPOSAL  £150,000 SEP 25 MAR 26 OPEN PROCEDURE Page 113 of 292

Page 114

PROVISION OF EXTERNAL AUDIT AND TAX ADVICE (NLP AND FUSION ASSETS) £200,000 SEP 25 MAR 26 OPEN PROCEDURE
CLYDE VALLEY HS / ORCHARD PS ADDITIONAL CAPACITY WORKS £2,160,000 SEP 25 APR 26 OPEN PROCEDURE
LEGAL SERVICES FRAMEWORK AGREEMENT £2,000,000 SEP 25 APR 26 OPEN PROCEDURE
BUILDING MANAGEMENT SERVICES £2,000,000 SEP 25 MAY 26 OPEN PROCEDURE
EAST AIRDRIE LINK ROAD - CONSULTANCY SERVICES (SPECIMEN DESIGN) AND PROJECT
MANAGEMENT  £750,000 SEP 25 DEC 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
CUMBERNAULD DEMOLITION CONSULTANT £250,000 SEP 25 DEC 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
INDEPENDENT GAS AUDITS £80,000 SEP 25 APR 26 OPEN PROCEDURE
MOBILE WEBCASTING & ELECTRONIC VOTING SOLUTION £180,000 SEP 25 FEB 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
PROVISION OF UIPATH LICENSING £180,000 OCT 25 DEC 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
AIRDRIE LEISURE CENTRE PUMP TRACK £140,000 OCT 25 FEB 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
DETAILED DESIGN OF RAVENSCRAIG INFRASTRUCTRE ACCESS SOUTH - WINDMILLHILL STREET
TO RAVENSCRAIG £750,000 OCT 25 DEC 25
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SUPPLY OF BIOMASS HEATING SYSTEM FUEL £450,000 OCT 25 APR 26 OPEN PROCEDURE
SMART HUB LANARKSHIRE £200,000 OCT 25 APR 26 OPEN PROCEDURE Page 114 of 292

Page 115

TENANT SATISFACTION SURVEY'S £50,000 OCT 25 JUN 26 OPEN PROCEDURE
SUPPLY OF VEHICLE PARTS  £3,000,000 OCT 25 FEB 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK
NEW BUILD SOCIAL HOUSING AT BANK STREET, COATBRIDGE £4,500,000 OCT 25 FEB 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK
NEW BUILD SOCIAL HOUSING AT BANK STREET, COATBRIDGE £4,500,000 OCT 25 FEB 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK
ROOFING WORKS AT PIVOT COMMUNITY CENTRE, MOODIESBURN £4,000,000 OCT 25 MAR 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
MANNED GUARDING AND KEY HOLDING SERVICES £150,000 OCT 25 MAR 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
GARDEN WASTE PERMIT PRINT AND DELIVERY SERVICES £500,000 OCT 25 APR 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
CONTAMINATED LAND INVESTIGATIONS AND ASSESSMENT REPORTS FOR PLANNING
APPLICANTS £120,000 OCT 25 APR 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK
CONTAMINATED LAND SITE INVESTIGATIONS £100,000 OCT 25 APR 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK
PROJECT MANAGER, QUANTITY SURVEYOR, PRINCIPAL DESIGNER SERVICES FOR ABRONHILL
COMMUNITY HUB £700,000 OCT 25 JUN 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
INDEPENDENT TESTER AND COMPLIANCE MONITOR SERVICES FOR ABRONHILL COMMUNITY
HUB £200,000 OCT 25 JUN 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
Page 115 of 292

Page 116

PROJECT MANAGER, QUANTITY SURVEYOR, PRINCIPAL DESIGNER SERVICES FOR ABRONHILL
COMMUNITY HUB £1,000,000 OCT 25 JUN 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
INDEPENDENT TESTER AND COMPLIANCE MONITOR SERVICES FOR ABRONHILL COMMUNITY
HUB £500,000 OCT 25 JUN 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
SUPPLY OF SACKS AND LINERS £250,000 OCT 25 JAN 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SUPPLY OF LAND MANAGEMENT TOOLS £150,000 OCT 25 MAR 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
SUPPLY OF HERBICIDES AND OTHER CHEMICALS £300,000 OCT 25 MAR 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
SUPPLY OF EDUCATIONAL FURNITURE  £1,000,000 NOV 25 MAR 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
SUPPLY OF AIDS FOR DAILY LIVING £2,625,000 NOV 25 JUN 26 OPEN PROCEDURE
SUPPLY OF BOX VANS £96,000 NOV 25 JAN 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SUPPLY OF VANS £160,000 NOV 25 JAN 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK
NEW BUILD SOCIAL HOUSING AT DALZELL DRIVE, MOTHERWELL. £6,480,000 NOV 25 MAR 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK
NEW BUILD SOCIAL HOUSING AT HILL STREET (FORMER ST MARY'S PS), CALDERCRUIX £6,000,000 NOV 25 MAR 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK
Page 116 of 292

Page 117

FRAMEWORK AGREEMENT FOR AD-HOC PASSENGER TRANSPORT (COACHES, MINIBUSES AND
TAXIS) £3,200,000 NOV 25 APR 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
FRAMEWORK AGREEMENT FOR VEHICLE MAINTAINED, REPAIRS AND OPERATIONAL DAMAGE,  £2,500,000 NOV 25 APR 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
PROVISION OF LAN / SAN HARDWARE SUPPLY / MAINTENANCE £50,000 NOV 25 APR 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
GLENMANOR PRIMARY SCHOOL MUGA PITCH £200,000 NOV 25 APR 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
SUPPLY OF PEOPLE CARRIER / 8/9 SEATER CARS £385,000 NOV 25 JAN 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK
PROVISION OF STORE SERVICES (COMBINE SACKS, TOOLS, PAINTS, FERTILISERS) £2,000,000 NOV 25 APR 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
BAIRNS' HOOSE DEVELOPMENT FUND £102,640 DEC 25 FEB 26
H&SRS AWARD
WITHOUT
COMPETITION
SHARED COLLEGE SUPPORT  £120,000 DEC 25 JUN 26 OPEN PROCEDURE 
SUPPLY OF THREE (3) X MECHANICAL HANDLERS £500,000 DEC 25 APR 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK
NEW BUILD SOCIAL HOUSING AT NEWTON DRIVE (FORMER ST BRIGID'S PRIMARY SCHOOL),
NEWMAINS £8,750,000 DEC 25 APR 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SUPPLY OF HAND HELD TOOLS AND EQUIPMENT £50,000 DEC 25 MAR 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK
Page 117 of 292

Page 118

RAVENSCRAIG ACTIVE TRAVEL LINK (RAVENSCRAIG EMPLOYMENT AREA TO MOTHERWELL) -
STAGE 3 MULTIDISCIPLINARY DESIGN SERVICES £100,000 DEC 25 MAR 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK
4 TOWERS MULTI DISCIPLINARY CONSULTANT  £180,000 JAN 26 MAR 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK
WORKWEAR, FOOTWEAR AND PPE FOR HOMECARE WORKERS £450,000 JAN 26 MAY 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
PROVISION OF GEOGRAPHIC INFORMATION SYSTEM (MAPPING) SOFTWARE £300,000 JAN 26 APR 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK
NEW BUILD SOCIAL HOUSING AT TAY STREET, COATBRIDGE (PENTLAND) £4,400,000 JAN 26 MAY 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SUPPLY OF GROCERIES AND PROVISIONS  £12,000,000 JAN 26 JUL 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
COATBRIDGE MAIN STREET IMPROVEMENTS FEASIBILITY STUDY £50,000 JAN 26 APR 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK
ROADS COMPLIANCE TESTING £150,000 FEB 26 SEP 26 OPEN PROCEDURE
CONDORRAT PRIMARY SCHOOL - ROOF REPLACEMENT(TARGETED INVESTMENT) £2,160,000 FEB 26 JUL 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
PROVISION OF POSTAL SERVICES £2,736,338 FEB 26 JUL 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
CONDORRAT PRIMARY SCHOOL - ELECTRICAL (TARGETED INVESTMENT) £2,010,000 FEB 26 JUL 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
Page 118 of 292

Page 119

PROVISION OF BANKING SERVICES £300,000 FEB 26 AUG 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
ADMINISTRATION SUPPORT OF ENGAGEMENT AND PARTICIPATION (SUPPORTED PEOPLE) £945,000 MAR 26 OCT 26 OPEN PROCEDURE
UNIX ORACLE SUPPORT HOSTED SERVICES. £285,000 MAR 26 AUG 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
RENTAL OF CO-LOCATION DATA CENTRE SERVICES £50,000 MAR 26 AUG 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
NEW BUILD SOCIAL HOUSING AT GARTLEA ROAD, AIRDRIE (COATS HOUSE) £6,300,000 MAR 26 SEP 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
NEW BUILD SOCIAL HOUSING AT FORMER PORTLAND SCHOOL, COATBRIDGE £6,000,000 MAR 26 NOV 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
NEW BUILD SOCIAL HOUSING AT ELM CRESCENT (FORMER MUIRPARK CARE HOME) £6,250,000 MAR 26 NOV 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
DELIVERY OF BA CHILDHOOD PRACTICE COURSE £308,000 MAR 26 OCT 26 OPEN PROCEDURE
TRANSPORT FOR ASN PUPILS 2026 / 27 £6,000,000 APR 26 AUG 26
CALL-OFF FROM
COUNCIL
FRAMEWORK / DPS
PROVISION OF INSURANCE COVER FOR THE COUNCIL'S INSURANCE PROGRAMME £17,856,685 APR 26 OCT 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
DESIGN AND BUILD OF RAVENSCRAIG COMMUNITY HUB £68,500,000 APR 26 DEC 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
SUPPLY OF FROZEN FOODS  £8,500,000 APR 26 OCT 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
Page 119 of 292

Page 120

HR AND PAYROLL SOLUTION, LICENSING AND MAINTENANCE £2,500,000 MAY 26 DEC 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
PROVISION OF AN ONLINE SCHOOL PAYMENTS SOLUTION £170,000 MAY 26 OCT 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
FRAMEWORK FOR SERVICES LINKED TO SCOTTISH ATTAINMENT CHALLENGE AND PUPIL
EQUITY FUND £17,000,000 MAY 26 JAN 27 OPEN PROCEDURE
NEW BUILD SOCIAL HOUSING AT FORMER DUNBETH TOWER, COATBRIDGE £25,500,000 MAY 26 JAN 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
INTELLIGENT EMAIL SECURITY SOFTWARE £230,000 JUN 26 NOV 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
EAST AIRDRIE LINK ROAD - DESIGN AND BUILD (DESIGN AND PHASED WORKS) - FIRST STAGE
OF CONTRACT DESIGN/SECOND PHASE WORKS £110,000,000 JUN 26 JAN 27 OPEN PROCEDURE
SUPPLY AND FIT OF TYRES (INCLUDING ASSOCIATED SERVICES) FOR VEHICLES AND PLANT £1,500,000 JUN 26 NOV 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
TENANTS HOME CONTENTS INSURANCE SCHEME £2,200,000 JUL 26 APR 27 OPEN PROCEDURE
SUPPLY OF MILK £2,500,000 AUG 26 SEP 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK
TOTAL LEARNING MANAGEMENT SYSTEM GOVERNMENT (PUBLIC SECTOR) CATALOGUE
INTEGRATION MAINTENANCE £300,000 AUG 26 NOV 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK
DISPOSAL AND TREATMENT OF KERBSIDE COLLECTED GLASS, METAL AND PLASTICS WASTE £1,500,000 AUG 26 JAN 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
NEURODEVELOPMENTAL FAMILY SUPPORT £524,000 SEP 26 APR 27 OPEN PROCEDURE
Page 120 of 292

Page 121

DISTRESS BRIEF INTERVENTION SUPPORT £2,012,000 SEP 26 APR 27 OPEN PROCEDURE
WHOLELIFE FAMILY SUPPORT £4,284,000 SEP 26 APR 27 OPEN PROCEDURE
COUNSELLOR FOR CARE EXPERIENCED YOUNG PEOPLE £190,000 SEP 26 APR 27 OPEN PROCEDURE
DEMOLITION ANVIL BLOCK - CONSULTANT APPOINTMENT £300,000 SEP 26 DEC 26
CALL-OFF FROM
3RD PARTY
FRAMEWORK
PROVISION OF DOMESTIC FLOORING £1,500,000 OCT 26 FEB 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
PROVISION OF DIGITAL MENTAL HEALTH AND WELLBEING SUPPORT SOLUTION £120,000 OCT 26 MAR 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
UTILITIES MONITORING AND TARGETING DATABASE £300,000 OCT 26 MAY 27 OPEN PROCEDURE
BOTTLED WATERCOOLERS AND ASSOCIATED PRODUCTS  £250,000 OCT 26 MAR 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
PROVISION OF COMMUNITY LIVING SUPPORT  £1,300,000 NOV 26 JUN 27 OPEN PROCEDURE
FLEET MANAGEMENT SOLUTION £300,000 NOV 26 APR 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
ASSISTIVE TECHNOLOGY CLIENT SUPPORT SERVICES AND MAINTENANCE £234,000 NOV 26 APR 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
EASTFIELD PRIMARY SCHOOL MUGA PITCH £200,000 NOV 26 APR 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
Page 121 of 292

Page 122

NEW BUILD SOCIAL HOUSING AT COATS ST, COATBRIDGE (FORMER JACKSON TOWER) £18,750,000 NOV 26 JUL 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
SUPPLY OF ELECTRIC CARS £284,200 NOV 26 JAN 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SUPPLY OF SMALL ELECTRIC VAN  £203,400 NOV 26 JAN 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SUPPLY OF PEOPLE CARRIER / 8/9 SEATER CARS £219,780 NOV 26 JAN 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SUPPLY OF PANEL VANS - ELECTRIC  £203,400 NOV 26 JAN 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SUPPLY OF VANS - ELECTRIC  £207,700 NOV 26 JAN 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SUPPLY OF VANS £428,400 NOV 26 JAN 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SUPPLY OF 4X4 VEHICLES £120,000 NOV 26 JAN 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK
REMOVAL, STORAGE, REDISTRIBUTION AND DISPOSAL SERVICES £450,000 NOV 26 JUN 27 OPEN PROCEDURE
FLEXIBLE FRAMEWORK FOR EARLY LEARNING AND CHILDCARE SERVICES IN NORTH
LANARKSHIRE £63,000,000 DEC 26 AUG 27 OPEN PROCEDURE
MICROSOFT 365 BACK UP SOLUTION £170,000 DEC 26 MAY 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
PROVISION OF OCCUPATIONAL HEALTH SERVICES AND EMPLOYEE ASSISTANCE PROGRAMME £2,775,000 DEC 26 JUN 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
Page 122 of 292

Page 123

SUPPLY OF FRESH MEATS, COOKED MEATS AND FRESH FISH £3,000,000 JAN 27 JUN 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
MAKING LIFE EASIER WEB-SOLUTION FOR SOCIAL CARE £306,000 JAN 27 AUG 27 OPEN PROCEDURE
ROAD CORING £250,000 JAN 27 SEP 27 OPEN PROCEDURE
PROVISION OF PROGRESS MAINTENANCE AND SUPPORT £208,000 JAN 27 APR 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK
REFRIGERATION CATERING EQUIPMENT SUPPLY AND REPAIR £1,350,000 JAN 27 JUL 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
NEW BUILD SOCIAL HOUSING AT FORMER COURSINGTON TOWER, MOTHERWELL £18,900,000 JAN 27 SEP 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
SUPPLY AND DELIVERY OF LIQUID FUELS £15,000,000 JAN 27 APR 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK
SUPPLY OF 26T REFUSE COLLECTION VEHICLES £1,290,000 FEB 27 APR 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK
PROVISION OF WASHROOM SOLUTIONS £500,000 FEB 27 MAY 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK
CARDINAL NEWMAN HS RE-ROOFING £3,000,000 FEB 27 JUL 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS
BEFRIENDING SERVICE NORTH LANARKSHIRE  £380,000 MAR 27 OCT 27 OPEN PROCEDURE
PROVISION OF A FLEET TRACKER SYSTEM £280,000 MAR 27 AUG 27
CALL-OFF FROM
3RD PARTY
FRAMEWORK / DPS Page 123 of 292

Page 124

RECRUITMENT ADVERTISING AND PINS £1,100,000 MAR 27 OCT 27 OPEN PROCEDURE 
Page 124 of 292

Page 125

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT / PH Date 10/09/25 
Revenues and Benefits Update 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 07583 010692 
Executive Summary
This report provides an update on the performance within the Revenues and Benefits
functions of Finance and Technology as at 30 June 2025. 
Key points to note include: 
• As at 30 June 2025, 29.10% of Council Tax due for 2025/26 had been collected. This
is a marginal increase from the same period last financial year (0.08%). 
• Non-Domestic Rates collection at 30 June 2025 20.90% of the total annual charge
which is slightly higher than the previous financial year (20.63%). 
• The Service continues to meet statutory timescales for administering benefits
applications and changes of circumstance. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the content of the report. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work Statutory / corporate / service requirement
Item 10
Page 125 of 292

Page 126

1. Background 
1.1 The Finance Service is responsible for the administration and collection of all local
taxation in North Lanarkshire in the form of Council Tax and Non Domestic Rates. 
1.2 In addition, the Service administers a number of benefits for residents of North
Lanarkshire including Housing Benefit, Council Tax Reduction, Scottish Welfare Fund,
Discretionary Housing Payment, Free School Meals, Clothing Grants and Blue
Badges. 
2. Report  
Council Tax 
2.1 The graph below shows the cash collected at 30 June for each financial year. It is worth
noting that cash is allocated to specific Council Tax years so the graph represents cash
received against the initial billing year (i.e. billed and received in 2025/26) and does
not include cash collected in subsequent years (i.e. billed in 2024/25 but received in
2025/26). This ensures a like for like comparison. 
2.2 The collection figure to 30 June in the 2025/26 financial year of 29.10% is 0.08% higher
than the same period last financial year. 
2.3 It should be noted that in-year collection of Council Tax is a Statutory Performance
Indicator. However, it does not reflect the overall collection rate of Council Tax which
includes collection of prior year arrears. This latter measure has a greater bearing on
the Council’s finances and is reflected in the regular budget monitoring reports to
Committee. 
2.4 Members may be aware that the Service undertakes an ongoing programme of
discount and exemption reviews to ensure that everyone receives the discounts they
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26
Percentage of annual billing collected (%)
Financial Year
Council Tax Collection Rate at 30 June
Page 126 of 292

Page 127

are entitled to and that discounts are awarded to the appropriate people. A review of
all customers currently receiving single person discount (SPD) is about to commence.  
2.5 This review was last completed during 2023 by outsourcing this to an external third-
party to match and review council tax SPD records to credit reference data. This
yielded positive results, and as such, we are again using an external third-party to
undertake this review. Where initial data matching indicates a potential risk of fraud or
error, residents will receive a letter requesting they update their details in respect of
their entitlement to SPD by using the either the text facility noted on the
letter, completing an online SPD review form or returning the letter to the address noted
on it with the relevant information. This will also discharge the requirement to review
any matches for SPD identified via the National Fraud Initiative (NFI), as the NFI report
will be matched to the outcome of this review. The results will be reported to the Audit
and Scrutiny Panel, in accordance with established practice. 
Non-Domestic Rates
2.6 The following graph shows the cash collected at 30 June for each financial year: 
2.7 The collection figure to 30 June in the 2025/26 financial year is 20.90%. This
represents an increase of 0.27% compared to the same time period in 2024/25. 
Housing Benefits 
2.8 The data below highlights the Statutory Performance Indicators measuring the speed
of processing for new Housing Benefit claims and for changes in circumstances. The
table below shows the cumulative figures for the 2025/26 financial year. 
Days to Process 2024/25 2025/26 DWP Processing
Target
New Claims  12 16 < 30 days
Change of Circumstances  9 7 < 16 days 
2.9 The Service continues to meet DWP targets aligned to the statutory requirements for
the speed of processing of both new claims and changes of circumstances. 
0
5
10
15
20
25
2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26Percentage of annual billing collected
(%)
Financial Year
Non Domestic Rates Collection Rate at 30 June
Page 127 of 292

Page 128

Council Tax Reduction Scheme 
2.10 As at 30 June 2025 a total of £29.140m in Council Tax Reduction has been awarded
for the 2025/26 financial year. This compares to £26.278m to the same period during
2023/24, representing an increase of £2.862m (10.89%). 
2.11 The Service received 1,577 applications between 1 April and 30 June 2025 compared
with 1,862 during 2024/25, representing a decrease of 15.30%.  
2.12 The Service continues to see an upward trend in the volume of changes in
circumstances requests. From 1 April to 30 June 2025 a total of 57,841 changes were
processed compared to 44,951 for the previous financial year; an increase of 28.7%. 
Discretionary Housing Payments (DHP) 
2.13 From 1 April 2017 funding for DHP has been devolved to Scottish Government. This
funding supports both the Scottish Government’s commitment to fully fund the
implications of the Bedroom Tax and an additional sum available for other reasons
such as the Benefit cap and the restrictions on Local Housing Allowance rates. 
2.14 From 1 January 2023 the Scottish Government is fully funding the implications of
mitigating the benefit cap. This was announced as part of the tackling child poverty
delivery plan ‘Best Start, Bright Futures’ in March 2022. Local authority Leaders have
agreed to fuller benefit cap mitigation through the DHP scheme from 1st January 2023.
For 2025/26 the Scottish Government has provided ring-fenced funding of £0.469m to
mitigate the benefit cap. As at 30 June, the amount paid and committed in respect of
the benefit cap was £0.007m (1.49%). 
2.15 As at 30 June 2025 the total paid and committed in respect of Bedroom Tax was
£5.492m. In comparison, this sum was £5.581m at the same point during 2023/24. 
2.16 In addition the Council also receives £0.467m in respect of non-bedroom tax related
issues. As at 30 June 2025 £0.121m (25.86%) has been paid or committed from the
fund. 
2.17 As in previous years, the Service will continue to liaise with colleagues in Housing and
Housing Associations to encourage applications to the fund. In addition, the Service
will also liaise with Universal Credit claimants affected by the benefit cap who could
possibly be eligible for the mitigation. 
Scottish Welfare Fund 
2.18 The Council has administered the Scottish Government’s Scottish Welfare Fund
(SWF) since 1 April 2016. 
2.19 The Scottish Government provides an annual award budget of £2.760m to North
Lanarkshire Council. 
2.20 As indicated in the last update to Committee, the Council has continued to assess
applications at High priority. This means that applications will only be considered where
there is immediate and severe need, applicants are highly vulnerable, where there will
be significantly adverse impacts to health and wellbeing with a no grant award, and
where the effect of the grant is immediate and substantial. Staff assessing Scottish
Welfare Fund applications are highly trained in making these judgements in
Page 128 of 292

Page 129

accordance with the statutory guidance and where an application is unsuccessful they
will signpost the applicant to other community-based supports. 
2.21 There are two grant schemes and their relative performance during 2025/26 and prior
year comparison is as follows: 
2025/26 
Applications
Assessed
Awards Unsuccessful
Applications
Acceptance
Rate
Crisis Grants 4,563 3,505 1,058 76.8%
Community Care
Grants
907 588 319 64.8%
Total 5,470 4,093 1,377 74.8% 
2024/25 
Applications
Assessed
Awards Unsuccessful
Applications
Acceptance
Rate
Crisis Grants 5,077 3,757 1,320 74.0%
Community Care
Grants
1,444 1,015 429 70.3%
Total 6,521 4,772 1,719 73.2% 
2.22 As at 30 June 2025, the total financial value of grants paid from the Scottish Welfare
Fund amounted to £674,669. The underspend carried forward from 2024/25 has now
been utilised and the award budget for 2025/26 is now being spent. 
2.23 During 2025/26, the Scottish Welfare Fund has seen a decrease in demand for Crisis
applications of 10.1% and a decrease in demand for Community Care Grant
applications of 37.2%. The decline in SWF application volumes during 2025/26
appears to be influenced by a combination of policy, awareness, accessibility, and
broader socioeconomic factors. The continued application of High priority criteria will
likely maintain this trend 
2.24 The Service strives to assess applications within the timescales outlined within Scottish
Government guidance. Throughout the period the Service has largely continued to
assess Crisis applications within the two working day time limit. Whilst it has been more
challenging throughout the last year to meet the 15 working day time limit for
Community Care Grants, the Service is currently assessing such applications within
that timeframe and continues to Fastrack applications linked to homelessness
supporting the wider Rapid Rehousing and Homes First strategies. 
Clothing Grants and Free School Meals 
2.25 The Finance Service administers Clothing Grant payments and applications for Free
School Meals on behalf of the Council for families meeting low-income eligibility
criteria. 
2.26 Members will recall that the Finance Service amended the processing arrangements
for both clothing grants and free school meals last year, via the introduction of improved
digital solutions (an online form and robotic process automation to reduce the level of
manual checking by staff), which resulted in a significant increase in the number of
applications administered and paid out at the start of the summer holiday period.   
Page 129 of 292

Page 130

2.27 The same process has continued this year and to provide the most up-to-date position,
as at 31 July 2025, the Service administered and paid out 9,118 Clothing Grants (9,069
for the same period last year). The Service also awarded 8,055 Free School Meal
applications in this period which is in line with the same period last year (8,005). 
Blue Badges 
2.28 The Finance Service administers the Blue Badge scheme in accordance with Scottish
Government guidance. The eligibility criteria means that some are automatically
entitled to a Blue Badge. In other cases, the Council assesses an individual’s eligibility
which may include the requirement for a mobility assessment and meeting a healthcare
professional. 
2.29 As at 30 June 2025, the Service administered 3,074 Blue Badge applications with
2,467 awarded (80.25% award rate). Over the same period in the 2024/25 financial
year the Service administered 3,053 applications with 2,572 awarded (84.2% award
rate). 
2.30 Scottish Government guidance states that applicants should receive a decision on their
application in around 12 weeks. The Council is currently reaching a decision within 4
weeks. 
Visitor Levy 
2.31 Committee will recall their request that officers continue to investigate the potential for
introducing a Visitor Levy within North Lanarkshire which could see additional funding
being raised from tourist and business visitors and subsequently reinvested to improve
local facilities and services. A Visitor Levy Working Group consisting of various officers
across relevant Services has been established to create a draft Visitor Levy Strategy
with subsequent sub groups being created to further explore the potential impact of
introducing a levy; including soft engagement with the business community and
learning from neighbouring authority’s early launch; as well as considering the cost
implications of set up, administration and monitoring of such a scheme versus the likely
revenue to be generated. 
2.32 This work remains ongoing and the outcome of this along with a recommendation on
how to proceed will be reported to a future meeting of the Policy and Strategy
Committee. 
Other Considerations 
2.33 The Finance and Technology service is currently in the process of procuring an
updated Revenues and Benefits system that will support the ongoing administration of
revenues and benefits for the Council and support the collection of local taxation. The
contract strategy document anticipates that following extensive market research this
will be a direct award to the current provider through a Crown Commercial framework.
The service will report the outcome of the procurement exercise to Committee in line
with the Council’s General Contract Standing Orders. 
3. Measures of success 
3.1 Continuous improvement in processing and collection rates.   
Page 130 of 292

Page 131

4. Supporting documentation 
None 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 131 of 292

Page 132

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 132 of 292

Page 133

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
The Service has been liaising with Business and Digital on the Landlord Portal and
RPA developments and these will be managed in line with Business and Digital’s
available resources. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC).  
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 133 of 292

Page 134

Page 134 of 292

Page 135

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/KS/FC/DC Date 10/09/25 
Revenue Monitoring Report Council Summary
1 April 2025 to 18 July 2025 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 07583 010692 
Executive Summary
This report updates on the overall financial position for the General Fund Account, Housing
Revenue Account and Adult Health and Social Care, for the financial year to 31 March
2026.  The report consolidates the budget monitoring position of all Services, highlighting
and explaining major variances as per the Council’s approved Financial Regulations. 
The Council approved its General Fund Revenue Budget on 20 February 2025.  Following
confirmation of funding from Scottish Government, at the time of reporting, the overall
budget is now £1,088.895m.   At this early stage in the year, a surplus of £0.487m is
currently projected. 
The 2025/26 budget incorporates £6.628m of net savings. It is projected that £5.894m of
the savings (89%) will be delivered within the financial year, with replacement savings of
£0.734m identified to fully address the shortfall. 
Recommendations
It is recommended that the Finance and Resource Committee: 
(1) Acknowledge the financial position of the 2025/26 revenue budget; and 
(2) Otherwise endorse the contents of this report. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 11
Page 135 of 292

Page 136

1. Background 
1.1 The Council’s approved Financial Regulations require services to remain within their
approved budgetary provision, and to report all significant deviations - defined as the
higher of £100,000 or 5% - within their budget monitoring reports.  Where significant
deviations are identified, services must provide explanatory commentary, outline the
action required to rectify such deviations and where relevant, must also highlight the
impact this has on other budget headings. 
2. Report 
2.1 At its meeting of 20 February 2025, the Council approved a General Fund Revenue
Budget of £1,095.241m including expenditure budgets which will be offset by ring
fenced grant resources of £15.296m, resulting in a net expenditure position for
monitoring purposes of £1,079.945m.  Following confirmation of Scottish Government
funding for financial year 2025/26, and after reflecting, for monitoring purposes, the
reversal of use of balances in respect of previously approved savings now applied, the
overall total budget is now £1,088.895m. 
2.2 Following the budget setting in February 2025 the Council has an approved savings
target of £6.628m for 2025/26.  Further detail can be found in Section 2.9 below. 
2.3 Table 1 below summarises the projected income and expenditure position, which
illustrates a balanced budget, is currently envisaged at this early stage in the financial
year. 
Annual 
Budget
(£m)
Projected
Outturn
(£m)
P4
Variance
(£m)
Expenditure   
Total Expenditure 1,088.895 1,088.408 0.487
Income   
Aggregate External Finance   895.837   895.837 -
Local Tax Collection   187.769   187.769 -
Use of Balance   5.289 5.289 -    
Total Income 1,088.895 1,088.895 -
Forecast Surplus/ (Deficit): to
support future budgets
- 0.487 0.487
Table 1 
Analysis of Significant Variations 
2.4 Table 2 as follows illustrates the projected outturn financial position of services:  
Page 136 of 292

Page 137

Service P4 Outturn
(£m)
Education and Families - On Budget
Enterprise and Communities - On Budget
Chief Executives and Other
Corporate Services 0.487 Underspend
Social Work (Non-Integrated) - On Budget
Forecast Surplus/ (deficit): to
support future budgets 0.487 Underspend
Table 2 
2.5 Enterprise and Communities is reporting a projected breakeven position, with a number
of compensatory variances contributing to this overall position. Employee costs are
forecast to underspend by £1.308m as a result of vacancy savings partially offset by
increased overtime and turnover, together with an underspend of £0.242m in
Administration costs due to service redesign reducing First Stop Shops costs partly
offset by overspends on professional fees due to vacancies in the design team. These
underspends are offset by overspends in payments to other bodies of £0.533m,
primarily as a result of overspends in asset management, waste and fleet to cover
current vacancies, £0.279m in supplies and services primarily due to increased ICT
costs, and £0.362m overspend in property costs due to increased costs of stair and
close lighting and repairs. In addition, income is projected to under-recover by £0.383m
due to reduced recharges to capital as result of staff vacancies offset by an over
recovery in garden waste charges. 
2.6 Chief Executives and Other Corporate Services is reporting a projected underspend of
£0.487m, primarily as a result of employee cost savings across the service totalling
£0.189m due to vacancies, an underspend within Administration costs of £0.082m
mainly in respect of reduced training costs, and an over-recovery in income of £0.176m
relating to the NLP Financial Guarantee, and interest on repayments of VAT from
HMRC. 
2.7 Committee is also advised that the budget for both council tax income and council tax
reduction (CTR) are monitored on an ongoing basis. This includes consideration of
council tax collection, CTR uptake and household numbers. In addition, an assessment
of expected credit losses will be required.  At this point in the financial year the Council
Tax product is expected to be on budget and an update on this position will be reported
further into the financial year. 
2.8 It should be noted that the 2025/26 pay awards for non-Teachers has now been settled
with an uplift of 4% for 2025/26 and a further 3.5% for 2026/27 agreed. Negotiations in
relation Teachers pay award are still ongoing. Scottish Government has given
commitments around additional funding to support this offer. The full cost implications
will be finalised in due course, however at present it is anticipated that the provision
made within the 2025/26 budget in relation to pay awards, together with the additional
funding, will be sufficient to meet the costs. 
2.9  In line with recent years Scottish Government’s funding for pay includes £39.000m to 
be made through capital funding for 2025/26. Although the value has not yet been 
confirmed, North Lanarkshire Council has been asked to absorb a proportion of this in 
lieu of revenue funding.  As a result, the reported net budget illustrated in appendix 1 Page 137 of 292

Page 138

is expected to be reduced, with a corresponding increase in General Capital Grant. As 
in previous years, it is expected that a Local Government Finance Circular will be 
issued providing a temporary amendment to the statutory accounting requirements for 
capital grant which allows the necessary flexibilities in accounting such that the grant 
can be used to offset the revenue pressures linked to pay award, thus ensuring this 
transfer does not have a negative impact on the Council's overall revenue position. 
2025/26 Budget Savings 
2.10 As outlined in paragraph 2.2 above, the Council has approved net savings of £6.628m
for 2025/26.  Each Service reports on the achievement of their savings within the
relevant service monitoring report.  It is projected that £5.894m of savings (89%) will
be achieved in the current year, with replacement savings of £0.734m identified to fully
address the shortfall. 
Earmarked Reserves and Change Management Fund 
2.11 The Council’s unaudited annual accounts highlight a General Fund reserve balance of
£281.970m.  This balance includes £8.000m for the Contingency Fund, with a further
£242.079m earmarked for specific future commitments including £12.563m allocated
to the Change Management Fund to support one off costs of approved savings and to
ensure the Council has a resilient and sustainable financial plan. The remaining
£31.891m of funds have been set aside to support future budget strategies. 
2.12 A total of £143.138m of earmarked reserves is profiled for use in 2025/26 with a further
£98.941m profiled for use in future years. It is currently projected that £142.845m will
be spent during this financial year with £98.941m anticipated to be required in future
years and £0.293m no longer required. A summary position is shown in Appendix 2. 
Taking into account the projected forecast surplus of £0.487m and £0.293m of
earmarked reserves no longer required, it is expected that at the end of the financial
year the General Fund will include funds set aside for future budget pressures of
£32.671m as detailed in Appendix 3.  These balances are to support future budget
challenges in accordance with the approved reserves policy, and any budget smoothing
strategy recommended by the S95 Officer. 
Risks and Uncertainty 
2.13 All activities undertaken by the Council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy, Services manage these as part of their
overall corporate and service planning processes.  The current economic climate and
pay and non-pay inflation continuing at historically high levels, are some of the key
factors that have the potential to impact upon the Council’s ability to provide quality
services within approved budget levels. 
Housing Revenue Account 
2.14 The Housing Revenue Account is currently projecting a Breakeven position for the
financial year and anticipate that £1.050m of savings (100%) will be delivered by year
end. 
Adult Health and Social Care 
2.15 Council Adult Health and Social Care provision to the Integration Joint Board (IJB) is
projecting an overspend of £5.936m mainly as a result of overspends in payments to
other bodies and transfer payments of £6.802m primarily in relation to increased
Page 138 of 292

Page 139

demand in relation to Care at Home and Independent Care homes. These overspends
are partially offset underspend in employee costs of £0.760m as a result of slippage in
relation to recruitment across the service. The net overspend for the year will be fully
funded from IJB reserves. 
Arm’s Length External Organisations 
2.16 Following Committee agreement this paragraph will provide financial performance
information in relation to the Council’s Arm’s Length External Organisations (ALEOs),
namely North Lanarkshire Properties and Fusion Assets. However, these organisations
have their own governance arrangements, and report on their financial performance to
the appropriate Boards/ Management Committee in line with their own reporting
timetables. Therefore, at this point in the financial year, financial reporting information
relating to 2025/26 for these companies is not yet available.  However, this information
will be incorporated into future Revenue Monitoring Reports. 
3. Measures of success 
3.1 The Council continues to operate within approved budgeted resources.   
4. Supporting documentation 
Appendix 1 Summary by Division
Appendix 2 Anticipated Commitments – Earmarked Reserves
Appendix 3 Availability of One-Off Funds – Change Management Fund 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 139 of 292

Page 140

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 140 of 292

Page 141

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐     
Page 141 of 292

Page 142

LINE SERVICE  ACCOUNT ANNUAL PROVISIONAL
NO. BUDGET OUTTURN
(1) (2) (3) (4)
£      £      £     
1 Education, Children & Families 529,322,532                529,322,532                -                              
2 Early Years 32,272,807 32,272,807 -                              
3 Primary Schools 138,899,296 138,899,296 -                              
4 Secondary Schools 138,928,199 138,928,199 -                              
5 Special Schools 27,610,971 27,610,971 -                              
6 Education & Families Service Delivery 138,510,947 138,510,947 -                              
7 Childrens Services Social Work 43,300,552 43,300,552 -                              
8 Justice Services 93,996 93,996 -                              
10 Employability 2,870,623 2,870,623 -                              
11 Community Learning 4,669,239 4,669,239 -                              
12 Tackling Poverty 2,165,902 2,165,902 -                              
13 Enterprise & Communities 231,760,948                231,760,948                -                              
14 Assets & Procurement 41,404,659                  41,456,018                  (51,359 )                    
15 Trading Accounts (462,203 )                      (15,001 )                       (447,202 )                  
16 Community Operations 175,478,289                175,604,596                (126,307 )                  
17 Housing Management 6,048,616                    5,752,397                    296,219                   
18 Place 9,291,587                    8,962,938                    328,649                   
19 Chief Executives & Other Corporate Services 114,657,904                114,170,828                487,076                   
20 Directorate & Support 1,287,897                    1,286,525                    1,372                       
21 Finance & Technology 71,741,120                  71,546,219                  194,901                   
22 Audit & Risk 495,586                       475,384                      20,202                     
23 Legal & Democratic 2,999,478                    2,911,699                    87,779                     
24 People Resources 9,754,789                    9,712,617                    42,172                     
25 Strategy & Communications 7,260,044                    7,260,044                    0                             
26 Other Corporate Services 7,946,920                    7,806,271                    140,649                   
27 Joint Boards 13,172,070                  13,172,070                  -                              
28 Social Work (non Integrated) 220,834,072                220,834,072                -                              
29 GENERAL FUND SERVICES 1,096,575,456              1,096,088,380             487,076                   
30 FINANCING COSTS (29,305,800 )                 (29,305,800 )                 -                              
31 Reversal of Capital Charge (87,955,196 )                 (87,955,196 )                 -                              
32 Loan Charges and Interest on Revenue Balances 58,649,396                  58,649,396                  -                              
33 OTHER BUDGETARY ISSUES 21,625,809                  21,625,809                  -                              
34 Assumptions not yet Realised 21,625,809                  21,625,809                  -                              
37 Transfer from capital grant (Pay Award) -                                 -                              
38 TOTAL EXPENDITURE 1,088,895,465              1,088,408,389             487,076                   
39 SOURCES OF FUNDING 1,088,895,465              1,088,895,465             -                              
40 Aggregate External Finance 895,837,000                895,837,000                -                              
41 Council Tax 187,769,465                187,769,465                -                              
42 Use of balances 5,289,000                    5,289,000                    -                              
43 FORECAST (SURPLUS)/DEFICIT: TO SUPPORT FUTURE
BUDGETS
-                                 (487,076 )                     487,076                   
44 HOUSING REVENUE ACCOUNT (SURPLUS) / DEFICIT -                                 -                                 -                              
45 ADULT HEALTH AND SOCIAL CARE (SURPLUS) /DEFICIT -                                 5,936,342                    (5,936,342 )                
Appendix  1
NORTH  LANARKSHIRE COUNCIL
SUMMARY BY DIVISION FOR PERIOD ENDING 18 July 2025 (PERIOD 4)
PROVISIONAL
VARIANCES
Page 142 of 292

Page 143

Appendix 2
2025/26 Future Years Total
Opening
Reserve
Balances 
2025/26
Revised
Earmarked
Reserve 
25/26
Projected
Spend 
Anticipated
Year End
Balance 
Anticipated
Future Year
Use 
No Longer
Required 
Profiled for
Future Years 
Anticipated
Future Year Use 
No Longer
Required 
No Longer
Required
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000 Check Future Years
Change Management Fund 12,563         1,627           1,627          -                  -                  -               10,936              10,936              -               -                   10,936          -          
Earmarked & One Off Resources
Schools Future Contractual Obligations 66,330         -                  -                 -                  -                  -               66,330              66,330              -               -                   66,330          -          
Strategic Capital Investment Programme 44,800         44,800         44,800        -                  -                  -               -                       -                       -               -                   -               -          
Loans Charges 26,614         26,614         26,614        -                  -                  -               -                       -                       -               -                   -               -          
Strategic Workforce Planning 17,709         17,709         17,709        -                  -                  -               -                       -                       -               -                   -               -          
Temporary Accommodation 8,038          8,038           8,038          -                  -                  -               -                       -                       -               -                   -               -          
Refugee Resettlement Programmes 6,887          2,665           2,665          -                  -                  -               4,222                4,222                -               -                   4,222            -          
Whole Family Wellbeing 5,313          600              600             -                  -                  -               4,713                4,713                -               -                   4,713            -          
Budget One-off Investment 5,289          5,289           5,289          -                  -                  -               -                       -                       -               -                   -               -          
One Workforce Grading Pressures 5,000          5,000           5,000          -                  -                  -               -                       -                       -               -                   -               -          
Unmanaged burdens within Education, Children & Families 4,507          2,821           2,821          -                  -                  -               1,686                1,686                -               -                   1,686            -          
School ICT Upgrades linked with Windows 11 2,675          820              820             -                  -                  -               1,855                1,855                -               -                   1,855            -          
Balances held by Schools under Devolved School Management 2,395          2,395           2,395          -                  -                  -               -                       -                       -                                  - -               -          
Pupil Equity Fund 1,941          1,941           1,941          -                  -                  -               -                       -                       -               -                   -               -          
Early Years & Childcare Expansion 1,881          1,826           1,826          -                  -                  -               55                     55                     -               -                   55                 -          
Winter Reserve 1,500          1,500           1,500          -                  -                  -               -                       -                       -               -                   -               -          
Support of Restructure Realignment of Home to School
Transport
1,500          1,500           1,500          -                  -                  -               -                       -                       -               -                   -               -          
Economic Recovery 1,400          341              341             -                  -                  -               1,059                1,059                -               -                   1,059            -          
Owner Occupier Grants 1,233          -                  -                 -                  -                  -               1,233                1,233                -               -                   1,233            -          
Cumbernauld Town Centre Regeneration 1,042          -                  -                 -                  -                  -               1,042                1,042                -               -                   1,042            -          
Unmanaged burdens within Enterprise & Communities 1,000          1,000           1,000          -                  -                  -               -                       -                       -               -                   -               -          
Property Repairs 1,000          1,000           1,000          -                  -                  -               -                       -                       -               -                   -               -          
Other Earmarked Funds 21,462         15,652         15,359        293              -                  293          5,810                5,810                -               293               5,810            -          
Earmarked & One Off Resources Total 229,516       141,511       141,218      293              -                  293          88,005              88,005              -               293               88,005          -          
Total Reserves 242,079       143,138       142,845      293              -              293          98,941              98,941              -           293               98,941          -          
Contingency Reserve 8,000         
Non-Earmarked Balance; to support future budget challenges 31,891        
General Fund Surplus at 31 March 2025 281,970      
ANTICIPATED COMMITMENTS AGAINST EARMARKED RESERVES AS AT 18 July 2025 (PERIOD 4)
NORTH LANARKSHIRE COUNCIL
Page 143 of 292

Page 144

Appendix 3
£000 £000
Total Balance B/f per 2024/25 Annual Accounts 12,563 31,891
Period 4 reported variance 487
Earmarked Reserves no longer required 293
Total Balance 2025/26 before commitments 12,563 32,671
Revised one - off costs of approved savings (1,627)
Draw down from Capital Fund 0
Total Balance 2025/26;  to support future budget challenges 10,936 32,671
Known Commitments :- Revised one - off costs of approved savings (1,147)
Forecast Balance;  to support future budget challenges 9,789 32,671
NORTH  LANARKSHIRE COUNCIL
AVAILABILITY OF GENERAL FUND BALANCES AS AT 18 July 2025 (PERIOD 4)
Change Management
Fund
Future Budget
Pressures
Page 144 of 292

Page 145

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/PH/PF Date 10/09/25 
Revenue Budget Monitoring Report; Chief Executive’s Service
01.04.25 – 18.07.25 (Period 4) 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 07583 010692 
Executive Summary
This report provides a summary of the Chief Executive’s Service financial performance for
the Period 1 April 2025 to 18 July 2025 (Period 4).   The report illustrates the provisional
outturn as at 31 March 2026, with major outturn variances highlighted and explained per
the Council’s approved Financial Regulations. 
The Council approved its General Fund Revenue Budget on 20 February 2025, of which
£114.658m currently represents the net revenue budget for the Chief Executive’s Service.   
Incorporated within the revenue budget are approved service savings totalling £0.793m.   
The Service is currently projecting a year-end underspend of £0.487m for the financial year
predominately as a result of employee vacancies, reduced training costs and over-
recoveries of income relating to VAT interest and the NLP Financial Guarantee. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the financial position of the 2025/26 Chief Executive’s Service revenue
budget.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 12
Page 145 of 292

Page 146

1. Background 
1.1 The Council’s approved Financial Regulations require the Chief Executive to remain
within the approved budgetary provision, and to report all significant deviations -
defined as the higher of £100,000 or 5% - within budget monitoring reports. Where
significant deviations are identified, the Chief Executive must provide explanatory
commentary, outline the action required to rectify such deviations and where relevant,
must also highlight the impact this has on other budget headings. 
2. Report 
Summary of Financial Position 
2.1 The Council approved its General Fund Revenue Budget on 20 February 2025, of
which £113.897m (10.93%) represented the approved Revenue Budget for the Chief
Executive’s Service. Additional funding for the Improvement Service and in-year
transfers to Enterprise & Communities results in a revised budget of £114.658m. 
2.2 The overall projected outturn position of the Service is a year-end underspend of
£0.487m.  Appendices one to five provide further information in respect of this position. 
2.3 As at Period 4 the position on Council Tax Reduction Scheme remains under review
along with other elements of the Council Tax Product including household numbers and
Council Tax collection for the year.  The Council Tax Product will then be assessed for
expected credit losses as part of the year end process. It is currently anticipated there
will be no material variance overall.   
2.4 The 2025/26 budget incorporates £0.793m of service savings which have been fully
delivered at Period 4.  Further information regarding savings is included in Appendix 5. 
Analysis of Significant Variances 
2.5 The service currently anticipates a projected underspend of £0.189m within Employee
costs as a result of actual and projected vacancies.   
2.6 The service is projecting a year-end underspend of £0.023m within Supplies and
Services due to lower than anticipated ICT costs. 
2.7 The service is currently anticipating an underspend of £0.082m within Administration
Costs predominately due to underspends within training and other administration costs. 
2.8 The service is currently projecting an underspend of £0.016m within Payments to Other
bodies due to the prioritisation of UKSPF funding partially offset by costs for short-term
contracted agency staff. 
2.9  The projected outturn for income is an over-recovery of £0.176m predominately
attributable to VAT interest and the impact of the NLP Financial Guarantee. 
2.10 There are various minor variances across other budget areas resulting in the Service
forecasting an underspend of £0.487m as at 31 March 2026. 
Earmarked and One-off Reserves 
2.11 In finalising the Council’s draft accounts to 31 March 2025, the service was given
approval to earmark £3.045m of resources to fund key projects and initiatives profiled
Page 146 of 292

Page 147

over a number of years.  It is anticipated that £1.876m of the reserves balances will be
utilised in 2025/26, a balance of £0.040m to be returned to reserves and the remaining
balance required for future years.  Details of the Service’s earmarked funds are
provided in Appendix 4.    
2.12 The Service has also been given approval to utilise £2.439m of funds from the
Corporate Strategic Workforce Planning Reserve over a number of years.  It is
anticipated £1.738m of this reserve will be utilised in 2025/26 and actual costs arising
will be reported in future reports.  These funds are not included in the Service position. 
2.13 The Service was further given approval to utilise £0.253m of funds from the Change
Management Fund over several years.  It is anticipated that £0.099m will be utilised in
2025/26.  These funds are not included in the Service outturn position. 
2.14 The Service has incurred £0.223m of severance costs relating to previous approved
savings/restructures.  Therefore, there is a requirement to utilise the Corporate Change
Management fund at this time.  Any further costs arising will be reported in future
reports as they are incurred.  These costs are not included in the Service outturn
position. 
2025/26 Budget Savings 
2.15 The Council approved service savings of £0.793m savings have been fully delivered
as at Period 4. Further information regarding savings is included in Appendix 5. 
Management Actions 
2.16 The Service is being pro-active to ensure expenditure is contained within its approved
2025/26 budget. 
3. Measures of success 
3.1  The Service continues to operate within approved budget resources.   
4. Supporting documentation 
4.1 Appendix 1 Objective Summary
4.2 Appendix 2 Subjective Summary
4.3 Appendix 3 Payments to Other Bodies
4.4 Appendix 4 Earmarked Reserves
4.5 Appendix 5 Budget Savings 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 147 of 292

Page 148

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
As stated in the main body of the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 148 of 292

Page 149

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All activities undertaken by the Council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy, Services manage these as part of
their overall corporate and service planning processes. The current economic
climate, in particular, has the potential to impact upon the Council’s ability to provide
quality services within approved budget levels. 
To minimise risk, this report has been prepared by service based Finance
personnel in consultation with budget managers, in accordance with the Financial
Regulations. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 149 of 292

Page 150

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 150 of 292

Page 151

APPENDIX 1
[1] [2] [3] [5] [6] [7]
DIRECTORATE & SUPPORT 1,287,897 1,286,525 1,372 FAV 0.1% Minor
FINANCE & TECHNOLOGY 71,741,120 71,546,219 194,901 FAV 0.3%
Underspend in employee costs as a result of vacancies, over-
recovery of income relating to DWP Resource Management, offset
by overspends in relation to Insurance premiums and postages.
AUDIT & RISK 495,586 475,384 20,202 FAV 4.1% Underspend within employee costs.
LEGAL & DEMOCRATIC 2,999,478 2,911,699 87,779 FAV 2.9% Underspend within employee costs as a result of vacancies.
PEOPLE RESOURCES 9,754,789 9,712,617 42,172 FAV 0.4% On Target
STRATEGY & COMMUNICATIONS 7,260,044 7,260,044 0 0.0% On Target
OTHER COPORATE SERVICES 7,946,920 7,806,271 140,649 FAV 1.8% Over-recovery of income relating to VAT Repayment interest and the
NLP Financial Guarantee plus underspends in pensions.
JOINT BOARDS 13,172,070 13,172,070 0 0.0% On Target
NET EXPENDITURE 114,657,904 114,170,828 487,075 FAV 0.4% 0
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Objective Analysis
Period 04 (01 April 2025 - 18 July 2025)
A - Chief Executives Service
DIVISION OF SERVICE ANNUAL BUDGET PROJECTED
OUTTURN
PROJECTED OUTTURN
VARIANCE %
[4]
PERIOD
MOVEMENT ANALYSIS
Page 151 of 292

Page 152

APPENDIX 2
[1] [2] [3] [5] [6] [7]
EMPLOYEE COSTS 45,787,965 45,598,775 189,190 FAV 0.4% Underspends due to vacancies.
PROPERTY COSTS 2,052,817 2,061,055 (8,238) ADV (0.4%) Unbudgeted building repair costs.
SUPPLIES & SERVICES 10,835,836 10,813,214 22,622 FAV 0.2% Underspends within ICT.
TRANSPORT & PLANT 655,389 650,389 5,000 FAV 0.8% On target.
ADMINISTRATION COSTS 7,875,927 7,793,904 82,021 FAV 1.0% Underspends within training and other admin costs.
PAYMENTS TO OTHER BODIES 15,924,038 15,907,735 16,304 FAV 0.1% Underspend due to prioritisation of UKSPF funding.
TRANSFER PAYMENTS 112,598,087 112,598,087 0 0.0% On target.
CAPITAL FINANCING COSTS 6,873,574 6,873,574 0 0.0% On target.
REVENUE FINANCING COSTS 0 0 0 0.0% On target.
OTHER EXPENDITURE 5,189,924 5,185,924 4,000 FAV 0.1% Minor.
TOTAL EXPENDITURE 207,793,556 207,482,656 310,899 FAV 0.2% 0
INCOME (93,135,652) (93,311,828) 176,176 FAV (0.2%) Over-recovery of income relating to VAT Repayment interest and the
NLP Financial Guarantee.
NET EXPENDITURE 114,657,904 114,170,828 487,075 FAV 0.4% 0
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Subjective Analysis
Period 04 (01 April 2025 - 18 July 2025)
A - Chief Executives Service
CATEGORY ANNUAL BUDGET PROJECTED
OUTTURN
PROJECTED OUTTURN
VARIANCE %
[4]
PERIOD
MOVEMENT ANALYSIS
Page 152 of 292

Page 153

APPENDIX 3
[1] [2] [3] [5] [6] [7]
PAYMENTS TO OTHER BODIES GENERAL 408,443 408,443 0 0.0%
MEDICAL FEES 11,104 16,491 (5,387) ADV (48.5%) Increased costs in relation to medical fees.
AGENCY FEES 167,686 182,996 (15,310) ADV (9.1%) Agency staff for fixed term within L&D, being offset by
vacancies within Employee costs.
TOWN TWINNING 0 0 0 0.0%
CHILDRENS PANEL 25,035 25,035 0 0.0%
COSLA ANNUAL LEVY 207,942 207,942 0 0.0%
COMMUNITY COUNCIL GRANTS 125,222 125,222 0 0.0%
GRANTS TO ORGANISATIONS 773,242 773,242 0 0.0%
EXTERNAL AUDIT FEE 644,389 644,389 0 0.0%
ELECTION PROVISION 0 0 0 0.0%
TOURISM - VISIT NORTH LANARKSHIRE 77,000 40,000 37,000 FAV 48.1% Prioritisation of UKSPF funding
SCOTTISH WELFARE FUND 3,375,940 3,375,940 0 0.0%
SUB-CONTRACTOR PAYMENTS 1,869 1,869 0 0.0%
LOCAL TAX PAYPOINT COMMISSION 35,000 35,000 0 0.0%
COSLA MIGRATION SCOTLAND 150,000 150,000 0 0.0%
LANDS VALUATION CONTRIBUTION 1,814,004 1,814,004 0 0.0%
SPT CONTRIBUTION 5,481,746 5,481,746 0 0.0%
SPT CONCESSIONARY FARES CONTRIBUTION 569,805 569,805 0 0.0%
CUSTOMER FIRST CONTRIBUTION 2,700,000 2,700,000 0 0.0%
TOTAL EXPENDITURE 16,568,427 16,552,124 16,303 FAV 0.1% 0
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Payments to Other Bodies
Period 04 (01 April 2025 - 18 July 2025)
A - Chief Executives Service
CATEGORY ANNUAL BUDGET
[4]
PROJECTED OUT-TURN
VARIANCE
PROJECTED OUT-
TURN % PERIOD
MOVEMENT ANALYSIS
Page 153 of 292

Page 154

APPENDIX 4
Value %
Service Specific Earmarked Reserves:
Modern Apprentices 53,813 0 53,813 11,190 28,583 53.1% 0 25,230 28,583
Underspend is a result of previous postholders
successfully gaining employment prior to the end of
their placement.
SWF Grant (Core and Admin) 616,096 0 616,096 0 616,096 100.0% 0 0 616,096
Civica Procurement Implementation 500,000 (500,000) 0 0 0 0.0% 0 0 0
Redundancy costs for staff (includes additional) 250,000 0 250,000 0 250,000 100.0% 0 0 250,000
Investment model replacement of funds 128,735 0 128,735 38,768 128,735 100.0% 0 0 128,735
Backfill for EUC Infrastructure Team (Windows 11) 26,552 0 26,552 21,036 26,552 100.0% 0 0 26,552
Training 12,000 0 12,000 0 12,000 100.0% 0 0 12,000
Equipment 15,000 0 15,000 0 0 0.0% 0 15,000 0 Reserve no longer required
Learning / Construction Academy 225,111 0 225,111 6,557 225,111 100.0% 0 0 225,111
Brighter Futures 117,224 (57,498) 59,726 13,978 59,726 100.0% 0 0 59,726
CSH Recover NL 13,107 (5,974) 7,133 7,133 7,133 100.0% 0 0 7,133
Recover NL CSH 2022/23 (Single Number) 457,861 (457,861) 0 0 0 0.0% 0 0 0
Grant Award Programme 54,000 (54,000) 0 0 0 0.0% 0 0 0
SC&E - Grant Award Programme 131,787 0 131,787 0 131,787 100.0% 0 0 131,787
SC&E - Cumbernauld Community Grant 53,322 (53,322) 0 0 0 0.0% 0 0 0
SC&E - Cumbernauld Grants - LDP Funds 59,023 0 59,023 59,023 59,023 100.0% 0 0 59,023
SC&E - Greengairs Community Council 80,000 0 80,000 0 80,000 100.0% 0 0 80,000
Investment model replacement of funds 251,297 (0) 251,297 0 251,297 100.0% 0 0 251,297
TOTAL 3,044,928 (1,128,655) 1,916,273 157,685 1,876,043 97.9% 0 40,230 1,876,043
Reprofile to
Future Years
No Longer
Required
Reserves
Required In
Year
Commentary Regards Usage
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Status of Earmarked Reserves
Period 04 (01 April 2025 - 18 July 2025)
A - Chief Executives Service
FINANCIAL YEAR - 2025/26
DESCRIPTION OF EARMARKED RESOURCE Reserve
Allocation
Profiled in
Future Years
Approved
Reserve
Total
Spend to
Date
Projected Spend
Page 154 of 292

Page 155

APPENDIX 5
£000 £000 £000
27CEX - a Chief Officer Review 140 140 0
04CEX Finance (5%) 71 71 0
Trend in recovery of rent allowances / rent rebates 200 200 0
12CEX Business & Digital - Technology Solutions - restructure and review of contracts 290 290 0
13CEX Business & Digital - Business Strategy 35 35 0
08CEX Registrars 57 57 0
TOTAL 793 793 0
APPROVED SAVINGS
Ref. DESCRIPTION OF APPROVED SAVING Target Value Value
Deliverable Savings Gap Reasons for Savings Gap
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Savings
Period 04 (01 April 2025 - 18 July 2025)
A - Chief Executives Service
Page 155 of 292

Page 156

Page 156 of 292

Page 157

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/VR/RM Date 10/09/25 
Capital Programme 2025/26 Monitoring Report 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 07583 010692 
Executive Summary
The purpose of the report is to provide an update on the 2025/26 resources and
expenditure for the Council's Strategic Capital Investment Programme. The report shows
the 2025/26 projected outturn position and the resultant variances. 
It is currently anticipated that the General Fund programme will be in line with the
programme budget but will be subject to continuous review as the financial year
progresses. 
With the HRA programme, the projected outturn also anticipates that expenditure will be in
line with the programme budget at this early stage of the financial year. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledges the provisional outturn financial position of the Council’s Strategic
Capital Investment Programme as at 18 July 2025. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 13
Page 157 of 292

Page 158

1. Background 
1.1 The Strategic Capital Investment Programme 2024/25 to 2028/29 was approved at
Policy and Strategy Committee in March 2025 and represents the total Community
Investment Programme incorporating the General Services Capital Programme and
HRA Capital Programmes.  The programme was developed in conjunction with
Services and led by the Strategic Capital Delivery Group (SCDG) using the principles
established by the Council’s Capital Strategy. 
1.2 The General Services Capital Programme supported by General Services resources
demonstrates to communities that the place making visions for towns remains a priority
and that the approved 5-year capital investment plan supports delivery of The Plan for
North Lanarkshire. The programme includes additional investment in Town and
Community Hubs, the City Deal programme, and external grant funding. 
1.3 In addition, the Housing Revenue Account (HRA) resources support several HRA
Capital Investment Programmes including the Mainstream programme for investment
in the Council’s existing estate and delivery of the ambition for 5,000 additional supply
through the New Build and Council Buy Back programmes. 
1.4 The 2025/2026 General Services Capital Programme is currently £199.577m with a
£140.146m investment programme in relation to the Housing Revenue Account. This
reflects the approved budget in March 2025 at Policy and Strategy Committee and
subsequent decisions made at the Strategic Capital Delivery Group (SCDG) in
accordance with the SCDG terms of reference, and where appropriate either by the
individual service committees, Finance and Resources Committee or the Policy and
Strategy Committee per the Scheme of Administration. Appendix 1 provides a
breakdown of the overall 2025/26 budget by Service Programme and associated
approved budget movements. 
2. Report 
Overall Council Strategic Capital Investment Programme 
2.1. The overall Council Strategic Capital Investment programme for 2025/26 and the
provisional outturn to 31 March 2026 is summarised in Table 1 as follows: 
Page 158 of 292

Page 159

2.2  On a budgeted programme of £339.723m expenditure is anticipated to be on budget 
with the current programme. Further financial performance information regarding each 
of the programmes is discussed in section 2.3 and 2.16 below. 
General Services Capital Programme and Projected Outturn by Service/ Programme 
2.3 The forecast financial performance of the overall General Services Investment
programme at 31 March 2026 is detailed in Appendix 2 and summarised below.  
Community Capital Investment  Programme Summary 2025/26
Current
Programme
£000s
Provisional
Outturn 
£000s
Outturn
Variance 
£000s
Enterprise & Communities 183,058 183,058 0
Chief Executives 10,758 10,758 0
Adult Health & Social Care 2,364 2,364 0
Corporate Contingency 3,397 3,397 0
General Services: Total Capital Investment 199,577 199,577 0
General Services Resources:
General Fund
External Grants & Contributions 2025/26 - GCG 27,637 27,637 0
External Grants & Contributions 2025/26 - Other Grants 10,582 10,582 0
External Grants & Contributions b/f 2024/25 - Other Grants 7,924 7,924 0
External Grants & Contributions Unapplied cfwd to 2026/27 0 0 0
Net External Grants & Contributions 46,143 46,143 0
City Deal Grant 3,698 3,698 0
Capital Receipts 3,375 1,845 (1,530)
CFCR 27,370 27,370 0
General Services: Total Resources 80,586 79,056 (1,530)
General Services : Borrowing Requirement 118,991 120,521 1,530
HRA : Total Capital Investment 140,146 140,146 0
HRA Resources:
Net External Grants & Contributions 23,754 23,754 0
Capital Receipts 0 0 0
CFCR 20,089 20,089 0
HRA : Total Resources 43,843 43,843 0
HRA : Borrowing Requirement 96,303 96,303 0
Summary
Total Council : Capital Investment 339,723 339,723 0
Total Council : Resources 124,429 122,899 (1,530)
Total Council : Borrowing Requirement 215,294 216,824 1,530
Page 159 of 292

Page 160

General Services Total Resources 
2.4  The revised programme approved by the SCDG is £199.577m with total resources 
available to meet the current programme forecast to be £80.586m, resulting in a 
borrowing requirement of £118.991m. 
2.5  In 2025/26 net external grants and contributions of £46.143m will be utilised. This 
capital resource primarily includes the Scottish Government (SG) General Capital 
Grants receivable of £31.023m including General Capital Grant (GCG) of £27.637m 
and additional specific grant allocations for Active Travel of £1.490m and Vacant and 
Derelict Land Fund (VDLF) of £1.896m. In addition, other specific SG grants receivable 
of £3.766m and contributions from other sources such as City Deal Grant of £3.698m, 
Shared Prosperity Fund (SPF) of £1.406m, developer contributions of £1.342m, and 
other grants of £0.682m.  
2.6 Capital grants received in 2024/25 have been added to the programme to match 
expenditure in 2025/26 of £7.924m including £2.224m for VDLF, £0.949m for PBIP, 
£1.142m for Regeneration Capital Grant Fund (RCGF), £3.212m for Live Labs, 
£0.060m for Levelling Up Fund (LUF), £0.164m for Active Travel, £0.044m for Parking 
Prohibition, £0.038m for Community Bus Fund , £0.055m for Environmental Key Fund 
and £0.026m for Scottish Wildlife Trust. Whilst at Period 4 it is anticipated that all capital 
grant funding will be utilised in 2025/26, this will be monitored closely as the year 
progresses. 
2.7 Receipts from the sale of assets are currently projected to be £1.845m, which is
£1.530m less than the budget of £3.375m. This results in a corresponding increase in
the borrowing requirement for 2025/26, however these receipts will continue to be
closely monitored throughout the remainder of the financial year. 
General Services Total Expenditure 
2.8 As indicated in Table 1 the General Services investment programme is £199.577m. At
Period 4, the provisional outturn spend is on budget. Further analysis by
service/programme is outlined below and summarised within Appendix 2. 
2.9  Enterprise and Communities is projecting outturn expenditure of £183.058m, which
is on budget. Committed expenditure of £144.989m is currently reported, which
represents 79.20% of the targeted expenditure, and actual expenditure is £33.440m
which represents 18.27% of targeted expenditure. 
2.10 At this early stage in the financial year the Service is reporting a break-even position 
with no major variances to report.  However, it is worth noting that with continuing 
increases in the cost of delivering capital programmes all service areas continue to face 
significant challenges managing the delivery of capital programmes within the available 
envelope of resources. The Service will continue to seek to manage within existing 
resources. 
2.11 Chief Executives is projecting outturn expenditure of £10.758m, which is on budget.
Committed expenditure of £3.005m is currently reported, which represents 27.93% of
the targeted expenditure. Actual expenditure is £0.176m, which is 1.64% of targeted
expenditure. 
2.12 At this early stage in the financial year, the Service is reporting a break-even position 
with no major variances to report. All activities are closely monitored to ensure available
Page 160 of 292

Page 161

budgets are maximised whilst monitoring and actively managing the ongoing external 
challenges in delivery of projects.    
2.13 Adult Health & Social Care is projecting outturn expenditure of £2.364m, which is on
budget. Committed expenditure of £0.273m is currently reported, which represents
11.55% of the targeted expenditure, and actual expenditure is £0.208m which is 8.80%
of targeted expenditure. 
2.14 At this early stage in the financial year, the Service currently anticipates a balanced
position.  There remain uncertainties in respect of demand and complexity of need and
therefore this budget will continue to be monitored closely, and any forecast
movements will be highlighted in future reports. 
2.15 Corporate Contingency is projecting outturn expenditure of £3.397m, which is on
budget. There has been no committed or actual expenditure to date. 
HRA Capital Investment 
2.16 The financial performance of the HRA Capital Programme is reported in detail to the
Housing Committee. A summary of performance as at 18 July 2025 is provided at
Appendix 3.  
2.17 Total expenditure of £140.146m is forecast for 2025/26 which is on budget. Committed 
expenditure of £122.879m is currently reported, which represents 87.68% of the 
targeted expenditure, and actual expenditure is £27.244m which is 19.44% of targeted 
expenditure. 
3. Measures of success 
3.1  N/A   
4. Supporting documentation 
4.1 Appendix 1: Strategic Capital Investment Programme 2025/26 budget movements
4.2 Appendix 2: General Services Capital Investment Programme Summary 2025/26
4.3 Appendix 3: HRA Capital Investment Programme Summary 2025/26 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 161 of 292

Page 162

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The financial impact is outlined within the report
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 162 of 292

Page 163

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Despite the updated programme approved at Policy and Strategy Committee in
March 2024 the capital programme continues to face challenges in relation to the
wider economic climate, linked to availability of materials, contractors and
inflationary pressures. These are currently being managed by services and Project
Boards associated with specific programme delivery and will continue to be
monitored throughout the year in accordance with the SCDG Terms of Reference
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 163 of 292

Page 164

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 164 of 292

Page 165

2025/26 Strategic Capital Investment Programme – budget movements                                                                                        Appendix 1 
Enterprise &
Communities
Chief
Executives
Adult Health
&Social Care Corporate
Total General
Services
Investment
Programme
Total HRA
Investment
Programme
Total
Community
Investment
Programme
£000s £000s £000s £000s £000s £000s £000s
25/26 Opening programme approved Policy& Strategy Committee March 25 159,022 7,809 2,200 1,104 170,135 140,146 310,281
24/25 Overs/Unders Carry Forward 16,049 1,921 164 0 18,134 0 18,134
25/26 Budget adjustments approved by SCDG 230 0 0 0 230 0 230
Increase/(Decrease) in Externally Funded Projects 6,374 0 0 0 6,374 0 6,374
Increase/(Decrease) in CFCR 1,113 59 0 0 1,172 0 1,172
25/26 Budget adjustments to be approved by SCDG 270 969 0 2,293 3,532 0 3,532
Revised Capital Programme 2025/26 183,058 10,758 2,364 3,397 199,577 140,146 339,723
Page 165 of 292

Page 166

General Services Capital Investment Programme Summary 2025/26 - as at 31 March 2026 Appendix 2
Investment Current
Programme
2025/26
£000s
Projected
Outturn
2025/26
£000s
Outturn
Variance
2025/26
£000s
Committed
Expenditure
@ P4          
£000s
Committed
Expenditure 
% of
Projected
Outturn
Actual
Expenditure 
@ P4      
£000s
Actual
Expenditure      
% of
Projected
Outturn
Enterprise & Communities 183,058 183,058 0 144,989 79.20% 33,440 18.27%
Chief Executives 10,758 10,758 0 3,005 27.93% 176 1.64%
Adult Health & Social Care 2,364 2,364 0 273 11.55% 208 8.80%
Corporate Contingency 3,397 3,397 0 0 0.00% 0 0.00%
Total General Services Investment 199,577 199,577 0 148,267 74.29% 33,824 16.95%
General Services Resources;
External Grants & Contributions 2025/26 - GCG 27,637 27,637 0
External Grants & Contributions 2025/26 - Other Grants 10,582 10,582 0
External Grants & Contributions b/f 2024/25 - Other Grants 7,924 7,924 0
External Grants & Contributions Unapplied cfwd to 2026/27 0 0 0
Net External Grants & Contributions 46,143 46,143 0
City Deal Grant 3,698 3,698 0
CFCR 27,370 27,370 0
Capital Receipts 3,375 1,845 (1,530)
Total Resources  80,586 79,056 (1,530)
Borrowing Requirement: 
General Services 118,991 120,521 1,530
Total General Services Borrowing Requirement 118,991 120,521 1,530
Total Resources incl Borrowing Requirement 199,577 199,577 0
Page 166 of 292

Page 167

HRA Capital Investment Programme Summary 2025/26 - as at 31 March 2026 Appendix 3
Investment Current
Programme
2025/26
£000s
Projected
Outturn
2025/26
£000s
Outturn
Variance
2025/26
£000s
Committed
Expenditure
@ P4       
£000s
Committed
Expenditure      
% of Projected
Outturn
Actual
Expenditure
@ P4     
£000s
Actual
Expenditure      
% of
Projected
Outturn
Mainstream Programme 86,230 86,230 0 79,722 92.45% 18,638 21.61%
New Build Programme 41,919 41,919 0 41,919 100.00% 3,619 8.63%
Council Buy Back Scheme 11,997 11,997 0 1,238 10.32% 4,987 41.57%
Total HRA Investment 140,146 140,146 0 122,879 87.68% 27,244 19.44%
HRA Capital Resources;
External Grants & Contributions 23,754 23,754 0
External Grants & Contributions Unapplied 0 0 0
Net External Grants & Contributions 23,754 23,754 0
CFCR 20,089 20,089 0
Capital Receipts 0 0 0
Total Resources 43,843 43,843 0
Borrowing Requirement:
HRA - Mainstream 70,811 70,811 0
HRA - New Build 18,537 18,537 0
HRA - Buyback Scheme 6,955 6,955 0
Total Borrowing Requirement 96,303 96,303 0
Total Resources incl Borrowing Requirement 140,146 140,146 0
Page 167 of 292

Page 168

Page 168 of 292

Page 169

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/PH/PF Date 10/09/25 
Chief Executive Service – Capital Monitoring Report 1 April to 18
July 2025 (Period 4) 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 07583 010692 
Executive Summary 
This report highlights the financial performance and projected outturn of 2025/26 Chief
Executive Service’s capital programme for the period ended 18 July 2025 (Period 4). 
In summary the service has a total capital budget of £10.758m, comprising of £6.736m
within Finance & Technology and £4.022m within Strategy & Communications.  This
budget reflects the budget approved by the Policy and Strategy Committee in March 2025,
additional Scottish Government Play Area funding and balances carried forward from
previous years. 
The Service is currently projecting a break-even position at this stage of the financial year. 
Further explanation of management action taken by the Service is included within the main
report and attached appendices. 
Recommendations
It is recommended that Finance and Resources Committee: 
(1) Considers the financial position of the 2025/26 Chief Executive Service capital
programme.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 14
Page 169 of 292

Page 170

1. Background 
1.1 This report provides a summary of the Chief Executive Service financial performance
for the period 1 April 2025 to 18 July 2025 (Period 4), with major outturn variances
highlighted and explained per the Council’s approved Financial Regulations. 
1.2 The Council approved its Capital programme at Policy and Strategy Committee on 13
March 2025 with an allocated budget of £7.809m for the current year.  In addition, carry
forwards from the previous year and Scottish Government funding for Play Areas have
resulted in a revised Capital Programme of £10.758m for the 2025/26 Financial Year
as detailed in Appendix 1 of this report.
1.3 The Council’s approved Financial Regulations required the Chief Executive to remain
within his approved budgetary provision, and to report all significant deviations –
defined as the higher of £0.100m or 5% - within their budget monitoring reports.  Where
significant deviations are identified, Chief Officers must provide explanatory
commentary, outline the action required to rectify such deviations and where relevant,
must also highlight the impact this has on other budget headings. 
2. Report 
Summary of Financial Position 
2.1 The Service is projecting break-even for the financial year 2025/26 of the Capital
Programme with no significant variances to report at this stage of the financial year.
Capital budgets and expenditure are summarised in Appendix 1.   
Management Action 
2.2 The Service closely monitors all activities to ensure available budgets are maximised
whilst monitoring and actively managing the ongoing external challenges in delivery of
projects.  The Service continues to review the programme with updates being provided
to the SCDG and Committee. 
3. Measures of success 
3.1  The Service aim is to operate within approved budget resources over the term of the
capital programme. 
4. Supporting documentation  
4.1 Appendix 1 Summary Expenditure by Project / Theme 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 170 of 292

Page 171

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
As stated within the main body of the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 171 of 292

Page 172

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.9.1 All activities undertaken by the Council are subject to risk, and in
acknowledging the Council’s approved Risk Management Strategy. Services
manage these as part of their overall corporate and service planning
processes.  The current economic climate, in particular, has the potential to
impact upon the Council’s ability to provide quality services within approved
budget levels. 
5.9.2 To minimise risk this report was prepared by Finance personnel in
consultation with budget managers, in accordance with the Financial
Regulations. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 172 of 292

Page 173

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 173 of 292

Page 174

Appendix 1
Theme 
Budget
£
Actual
£
Committed
£
Uncommitted
£
Projected
Outturn
£
Outturn
variance
£
Digitisation & Innovation 2,103,201          7,810               648,689           1,454,512           2,103,201           -                    
Line of Business (LOB) System Portfolio 2,839,072          -                   671,573           2,167,499           2,839,072           -                    
End User Device (Eud) Refresh 1,075,333          2,258               5,984               1,069,349           1,075,333           -                    
Cyber 115,000             -                   -                   115,000              115,000              -                    
Capacity 353,000             42,311             136,853           216,147              353,000              -                    
Innovation 250,000             -                   -                   250,000              250,000              -                     
TOTAL FINANCE & TECHNOLOGY 6,735,606          52,378             1,463,100        5,272,506           6,735,606           -                    
Community Board Project Investment Fund 3,472,041          123,916           1,541,996        1,930,168           3,472,041           -                    
Community Asset Transfers 550,000             -                   -                   550,000              550,000              -                     
TOTAL STRATEGY & COMMUNICATIONS 4,022,041          123,916           1,541,996        2,480,168           4,022,041           -                    
TOTAL CHIEF EXECUTIVES SERVICE 10,757,647        176,294           3,005,096        7,752,674           10,757,647         -                    
Chief Executives Capital Programme 2025/26
Summary Expenditure by Thematic Categories
Period 04 (01 April 2025 - 18 July 2025)
YTD OUTTURN
Page 174 of 292

Page 175

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/KS/RM/GM Date 10/09/25 
Treasury Management Monitoring Report for quarter ended 30
June 2025 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail McnameeR@northlan.gov.uk Telephone Ryan McNamee, Finance
Manager 
1. Background 
1.1 The Council manages its treasury activities in line with the CIPFA Code ‘Treasury
Management in the Public Services’. The Code requires the Council to produce reports
on its Treasury Management policies, practices and activities on a regular and ongoing
basis. The Council fulfils these obligations, in part, by the preparation of this Treasury
Management Monitoring report produced on a quarterly basis, encompassing a review
of performance. 
1.2 The Council’s “Treasury Management Strategy 2025/2026 and Treasury and
Prudential Indicators 2025/2026 to 2029/2030” was approved by Committee at its
meeting on 26 February 2025. The Treasury activity undertaken in the first quarter of
2025/26 reflects the key requirements of the Council’s 2025/26 Treasury Management
Strategy, with the Public Works Loan Board (PWLB) and Long-term Money Market
Executive Summary
This report fulfils the key requirements of the Council’s reporting procedures for Treasury
Management in accordance with the CIPFA Code of Practice on Treasury Management
and the CIPFA Prudential Code for Capital Finance in Local Authorities. It informs on the
quarterly Treasury Management activity for the period 1 April 2025 to 30 June 2025 and
compliance with the mandatory treasury and prudential indicators.
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the Treasury Management activity for the quarter ended 30 June
2025 including the performance against the key treasury and prudential indicators. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 15
Page 175 of 292

Page 176

being the prime source of long-term funds. In terms of investment activity, this is
conducted in accordance with the approved 2025/26 investment strategy. 
2. Report 
Summary Position 
2.1 The net overall borrowing position to 30 June 2025 is £1,193.8m, which is a reduction
of £41.4m from the final position at 31 March 2025. A detailed breakdown of the net
cash movement is shown in column (6) within Appendix 1 and is discussed below. 
Borrowing 
2.2 At the end of the quarter, total external debt amounted to £1,282.5m, an increase of
£1.7m. This was primarily due to additional net longer-term borrowing of £20.0m being
undertaken, comprising new PWLB borrowing of £20.0m, offset by repayment of
existing PWLB debt of £9.2m. 
2.3 During the quarter, the Council sourced PWLB loans totalling £20.0m on an equal
instalment payment (EIP) basis, which provides a smoother debt maturity profile, thus
spreading the refinancing risk The EIP loan was sourced at an interest rate of 4.65%
over an 8-year repayment period with the respective certainty rate discount (see para
2.6) utilised. 
2.4 In addition, there was a decrease in net temporary borrowing of £5.5m, due to £66.5m
falling due for repayment being offset by £61.0m of new borrowing. There was also a
£3.5m reduction in long term liabilities due to existing finance lease and Service
Concession obligations falling due for repayment and a £0.1m repayment of energy
efficiency loans. 
2.5 The Council’s approach to borrowing is in line with the approved strategy which aims
to source long-term borrowing and take advantage of temporary (short-term) borrowing
at attractive rates, and where possible, using internal cash balances, to meet the
principal repayments, daily revenue account requirements and the capital financing
requirement, in lieu of borrowing for capital purposes. The strategy adopted considers
interest rate forecasts, the management of carrying costs and the retention of cash
balances at appropriate levels, whilst managing the associated investment, interest,
and liquidity risk. 
2.6 The Council made a successful application to the PWLB to access the certainty rate
which allows a 20-basis point (bps) (0.20%) discount on loans from the PWLB under
the prudential borrowing regime. This will continue to provide the Council with an
opportunity to borrow from the PWLB at more beneficial rates until 31 March 2026. 
2.7 A new PWLB HRA rate, which is 0.40% below the certainty rate, has been available
from 15th June 2023, which has been extended until March 2026 in the UK Budget in
October 2024, to support local authorities borrowing for Housing capital purposes or
refinancing existing loans. In conjunction with our treasury advisors, we continue to
review borrowing requirements and assess borrowing opportunities for the Council
during 2025/26. 
2.8 The CIPFA Prudential Code is clear that local authorities must not borrow to invest
primarily for financial return and that it is not prudent for local authorities to make any
investment or spending decision that will increase the capital financing requirement and
so may lead to new borrowing, unless directly and primarily related to the functions of
Page 176 of 292

Page 177

the Council. The Council is compliant with this requirement. Members should note also
that PWLB loans are no longer available to local authorities planning to buy investment
assets primarily for yield. 
2.9 Members will be aware interest rates have risen significantly over the past 2 years,
increasing materially the cost of both short and long-term borrowing. In this quarter, the
Bank of England reduced the base rate to 4.25% in May. It should be noted that the
Council’s cost of short-term borrowing reduced slightly during the quarter. The cost of
new short-term borrowing from other local authorities has been similar to base rate
during the period at 4.0% to 4.5%. The Authority’s short-term borrowing cost has
reduced slightly over the period in line with base rate and short-dated market rates. The
average rate on the Authority’s current short-term loans of £214.5m at 30th June 2025
was 4.72%, this compares with 4.96% on £220.0m loans in previous quarter. 
2.10 After substantial rises in interest rates since 2021 many central banks have now begun
to reduce their policy rates, albeit slowly. Gilt yields have been volatile but have reduced
slightly except in the longer term in response to expectations of lower future interest
rates. There has been a slight increase in gilt yields for period of around 30 years and
longer, which is due primarily to an increased uncertainty premium being priced into
the longer period. 
2.11 The PWLB certainty rate for 10-year maturity loans was 5.38% at the beginning of the
period and 5.27% at the end. The lowest available 10-year maturity rate was 5.17%
and the highest was 5.56%. Rates for 20-year maturity loans ranged from 5.71% to
6.16% during the period, and 50-year maturity loans ranged from 5.46% to 5.97% 
Debt Restructuring 
2.12 In conjunction with our Treasury advisors, we monitored the economic climate in
relation to our financial targets and Treasury Management Strategy, for the quarter
under review. The interest rates prevailing throughout the period resulted in no
beneficial opportunities for debt restructuring/rescheduling of the existing PWLB debt
portfolio arising. 
2.13 The Council continues to hold £3.0m of LOBO (Lender’s Option Borrower’s Option)
loans where the lender has the option to propose an increase in the interest rate at set
dates, following which the Authority has the option to either accept the new rate or to
repay the loan at no additional cost. As market interest rates have risen, there was
increased probability of call options on the LOBOs being exercised by lenders,
however, no lender exercised their option during the quarter. 
2.14 Further reports regarding future activity will be presented to Committee as appropriate. 
Investments  
2.15 Treasury management investments arise from cash flows or treasury risk management
activity, that results in balances being invested, until the cash is required for use in the
course of business. 
2.16 At the end of the first quarter of 2025/26, the Council held total investments of £88.7m,
which is a net increase of £43.0m in cash and cash equivalents, primarily due to a
£15.7m increase in short-term investments held, reflecting maturing temporary
investments of approximately £392.6m, and undertaking new short-term investments
of £408.3m, and a favourable movement in uncleared balances due to timing
differences including cash in transit of £27.3m. See summary at Appendix 1, column 6.
Page 177 of 292

Page 178

2.17 At quarter end the uncleared balances including cash in transit was £9.7m which is a
net deficit position, a favourable increase of £27.3m compared to the position reported
at the end of the previous quarter of a net deficit position of £37.0m. This primarily
reflects the timing of significant BACS receipts and payments. The balance at 30 June
2025 comprises £9.5m of net BACS debits outstanding due for clearance within 3 days
of the quarter end date and cheques unpresented of £0.3m, partly offset by cash in
transit balance of £0.1m. 
2.18 In line with the approved strategy to manage liquidity, the Council aims to maintain a
minimum balance of £30.0m available on an overnight basis (instant access), ensuring
a prudent level of funds is maintained to meet all service requirements. 
2.19 During the quarter, the Bank of England’s (BoE) Monetary Policy Committee (MPC)
voted to reduce the base rate by 0.25% to 4.25%, which resulted in short-dated cash
rates also reducing, with rates ranging between 4.48% in early April to 4.15% in mid-
May, a reduction of 0.33% for overnight/7-day maturities. There is little noticeable
difference between the 7 day and 1-month SONIA (Sterling Overnight Rate) bid rates
and generally available investment rates offered by financial institutions and money
market funds. Despite this, the Council will endeavour to achieve good performance
levels in investment activity. 
2.20 Overall, the Treasury Management team continues to take a prudent approach to
investing surplus funds in line with the approved 2025/26 Investment Strategy. Security
of investment and ensuring sufficient liquidity are key investment criteria governing
Council investment decisions. This approach is aligned to the prudent management of
current commitments and future cash demands based on latest robust cashflow
projections. During the quarter, the rates on Debt Management Account Deposit Facility
(DMADF) deposits ranged between 4.20% and 4.45% and money market rates
between 4.21% and 4.50%. 
2.21 However, as demonstrated by the liability benchmark reported at (xi) below and
Appendix 3 attached, it is anticipated the Council will be a long-term borrower and
therefore new treasury investments are primarily made to manage day-to-day cash
flows using short-term low risk instruments. The existing portfolio of strategic pooled
funds will be maintained to diversify risk into different sectors and boost investment
income. 
Non-Treasury Management Investments 
2.22  During the quarter, repayments of £0.012m were made in respect of third-party
advances in connection with the Cumbernauld Academy DBFM and Greenfaulds
DBFM. 
Interest Rate Movements & Other Economic Updates 
2.23 As outlined by our treasury management advisors, the quarter started to significant
financial market volatility as US President Donald Trump announced a wide range of
‘reciprocal’ trade tariffs in early April, causing equity markets to decline sharply which
was subsequently followed by bond markets as investors were increasingly concerned
about US fiscal policy. As the UK was included in these increased tariffs, equity and
bond markets here were similarly affected by the uncertainty and investor concerns.
President Trump subsequently implemented a 90-day pause on most of the tariffs
previously announced, which has been generally positive for both equity and bond
markets since, but heightened uncertainty and volatility remained a feature over the
period.
Page 178 of 292

Page 179

2.24 UK headline consumer price inflation (CPI) increased over the quarter, rising from an
annual rate of 2.6% in March to 3.6% in June, well above the Bank of England’s 2%
target. The core measure of inflation also increased, from 3.4% to 3.7% over the same
period. May’s inflation figures were generally lower than in the previous month when
CPI was 3.5% and core CPI 3.8% but rose slightly again in June. Services inflation was
4.7% in May and June, a decline from 5.4% in April. 
2.25 Data released during the period showed the UK economy expanded by 0.7% in the first
quarter of the calendar year, following three previous quarters of weaker growth.
However, monthly GDP data showed a contraction of 0.3% in April, suggesting growth
in the second quarter of the calendar year is unlikely to be as strong as the first. 
2.26 Labour market data appeared to show a softening in employment conditions as weaker
earnings growth was reported for the period March to May 2025, in what would no doubt
be welcome news to BoE’s policymakers. Regular earnings (excluding bonuses) was
5.0% 3mth/yoy while total earnings was also 5.0% with both measures experiencing
decreases since last quarter. Both the employment and unemployment rates increased,
while the economic inactivity rate and number of vacancies fell. 
2.27 Having started the financial year at 4.5%, the MPC cut Base Rate to 4.25% in May. The
5-4 vote was split with the majority wanting a 25bps cut, two members voting to hold
rates at 4.5% and two voting for a 50bps reduction. At the June MPC meeting, the
committee voted by a majority of 6-3 to keep rates on hold. The three dissenters wanted
an immediate reduction to 4%. This dovish tilt by the Committee is expected to continue
and financial market expectations are that the next cut will be in August, in line with the
publication of the next quarterly Monetary Policy Report (MPR). 
2.28 The May version of the MPR highlighted the BoE’s view that disinflation in domestic
inflation and wage pressures were generally continuing and that a small margin of
excess supply had opened in the UK economy, which would help inflation to fall to the
Bank’s 2% target over the medium term. While near-term GDP growth was predicted
to be higher than previously forecast in the second quarter of calendar 2025, growth in
the same period the following year was trimmed back, partly due to ongoing global
trade developments. 
2.29 Our treasury management advisors maintain its central view that base rate would
continue to fall, and that the BoE would focus more on weak GDP growth rather than
stickier and above-target inflation. Two more cuts to base rate are expected during
2025, taking the main policy rate to 3.75%, however the balance of risks is deemed to
be to the downside as weak consumer sentiment and business confidence and
investment impact economic growth. 
2.30 In global terms, despite the uncertainty around US trade policy and repeated calls for
action from the US President, the US Federal Reserve held interest rates steady the
period, maintaining the Fed Funds Rate at 4.25%-4.50%. The decision in June was the
fourth consecutive month where no changes were made to the main interest rate and
came despite forecasts from Fed policymakers that compared to a few months ago
they now expected lower growth, higher unemployment and higher inflation. The
European Central Bank cut rates in June, reducing its main refinancing rate from 2.25%
to 2.0%, and representing the eighth cut in just over a year. ECB noted heightened
uncertainty in the near-term from trade and that stronger economic growth in the first
quarter of the calendar may weaken. Inflation in the region rose to 2.0% in June, up
from an eight-month low of 1.9% in the previous month but in line with the ECB’s target.
Inflation is expected to stay broadly around the 2% target over the next year or so.
Page 179 of 292

Page 180

2.31 After the sharp declines seen early in the quarter, sentiment in financial markets
showed signs of improvement during the period, but bond and equity markets remained
volatile. Early in the period bond yields fell, but then uncertainty from the impact of US
trade policy caused bonds to sell-off but from the middle of May onwards, yields have
steadily declined, but volatility continues. Equity markets sold off sharply in April but
have seen gained back most of the previous declines, with investors seemingly
remaining bullish in the face of ongoing uncertainty. 
2.32 Over the quarter, the 10-year UK benchmark gilt yield started at 4.65% and ended at
4.49% having hit 4.82% early in April and falling to 4.45% by the end of the same month.
While the 20-year gilt started at 5.18%, fell to 5.02% a few days later before jumping to
5.31% within a week, and then ending the period at 5.16%. The Sterling Overnight Rate
(SONIA) averaged 4.31% over the quarter to 30th June. 
2.33 Due to the cut in the base rate during the period, short-term borrowing interest rates
reduced with the short term 7-day offer rate ranging between 4.32% and 4.62% over
the period. Taking account of the decrease in borrowing rates and advice from our
treasury management advisors, it continues to be considered more cost effective in the
near term to use a combination of internal resources or to borrow rolling temporary /
short-term loans at lower interest rates where possible rather than long term borrowing.
This will result in increased temporary borrowing costs for the Council partially offset
by increased investment income earned on surplus balances. 
2.34 The Treasury Management team will continue to monitor financial and economic policy
and their impact upon the Council’s investment and borrowing activity. 
The Prudential Code for Capital Finance in Local Authorities 
2.35 The Local Government in Scotland Act 2003 requires the Council to undertake its
Treasury activities in line with the Prudential Code for Capital Finance in Local
Authorities. 
2.36 Committee, at its meeting on 26 February 2025, approved a report titled, “Treasury
Management Strategy 2025/2026 and Treasury and Prudential Indicators 2025/2026
to 2029/2030”. This report detailed a variety of mandatory and local indicators aimed
at assisting members to determine that proposed capital investment levels and treasury
management decisions satisfied the key requirements of affordability, prudence and
sustainability. Performance against key prudential indicators for 2025/26 to date is
detailed within Appendix 2. 
(i) Indicator 1(a) illustrates planned investment on capital expenditure is forecast to
be higher than initially anticipated by £39.1m in 2025/26. This reflects increases
of £25.2m in the General Fund capital investment and £14.3m for the HRA
Mainstream and New Build programmes partly offset by a decrease in Credit
Arrangements of £0.4m reflecting updated estimates of IFRS16 on service
concession contracts. This is based on the updated ‘Strategic Capital Investment
Programme 2024-2025 to 2028-2029’ approved at Policy & Strategy Committee
on 13 March 2025 and the ‘Housing Outline HRA Capital Programme 2025/26’
approved at Housing Committee on 12 February 2025 and also incorporating any
subsequent profiling updates e.g. carry-forwards from final outturn 2024/25
programmes. For further information, this is monitored in detail as part of the
Council's capital programme reporting mechanisms which will provide spend
details including any revisions to the estimates approved for 2025/26. 
Page 180 of 292

Page 181

(ii) The mix of resources required to finance the capital expenditure in 2025/26
reflects the updates on forecast capital investment. Therefore, the level of in-year
borrowing is anticipated to be higher by £27.5m due to increases in General Fund
programme requirements of £16.6m and £10.9m for HRA programme. This
forecast level of borrowing also reflects a net increase in capital grants and
external contributions of £13.2m with increased funds available to General Fund
of £6.5m and HRA programmes of £6.7m. A net increase of £0.5m in CFCR is
also anticipated (General Fund increase of £3.8m offset by decrease in HRA of
£3.3m) and a decrease in capital receipts of £1.7m within General Fund. 
(iii) IFRS 16 Lease Accounting was implemented in 2024/25. As a result of annual
remeasurement of PPP liabilities and Service Concessions, the accounting
impact is an estimated increased capital investment of £14.0m (increase to
capital financing requirement) to be recognised in 2025/26, which is a minor
decrease of £0.4m that initial estimates. It should be noted that this is an
accounting adjustment and does not represent cash expenditure, which is offset
by an equal and opposite recognition of associated credit arrangements
financing. 
(iv) Indicator 1(b) – The Council’s cumulative outstanding amount of debt finance is
measured by the capital financing requirement (CFR). The CFR is essentially a
measure of Council’s underlying borrowing need i.e. capital expenditure not
resourced by capital grants, receipts or CFCR, with any new borrowing increasing
the CFR. The CFR is projected to rise to £1,728.7m within financial year 2025/26. 
(v) The Prudential Code requires the Council’s capital investment to be prudent and
affordable. To demonstrate this, a Prudential Margin (the need to borrow versus
actual borrowing) is calculated. Indicator 1(c) demonstrates a healthy prudential
margin of £263.1m estimated as at 30 June 2025. The timing and profile of
external borrowing to replenish cash reserves and balances are being managed,
giving full consideration to liquidity, interest rate and refinancing risk, whilst
minimising the potential carrying costs. 
(vi) Indicator 1(d) illustrates that both the overall Authorised Limit and Operational
Boundary limits for borrowing and long-term liabilities have not been exceeded,
with the maximum borrowing undertaken within the period being well below the
approved boundaries. 
(vii) Indicator 1(e) illustrates the financing costs forecasts as at 30 June 2025 for both
general fund and HRA as a proportion of net revenue stream. Although capital
expenditure is not charged directly to revenue, interest payable on loans, and
loan fund and long-term liability repayments are. The net annual charge is known
as financing costs; this is compared to the net revenue stream i.e. the amount
funded from Council Tax, NDR and government grants. 
(viii) Indicator 2(a) highlights the proportion of external interest payable by the Council
which is fixed and variable over the term of the borrowing, and therefore the
exposure to the effects of interest rate changes. As at 30 June 2025, the level of
borrowing subject to variability is deemed to be within acceptable levels. 
(ix) Indicator 2(b) highlights a projected increase in loan charges of £1.9m compared
to the initial Treasury Management Strategy estimates for 2025/26. This
projection takes into account treasury management activity, internal Interest on
Revenue Balances (IORB) recharges due to increased market interest rates, the
loans fund holiday flexibility adopted in 2022/23 and decisions of the Policy and
Page 181 of 292

Page 182

Strategy Committee and the Strategic Capital Delivery Group to approve and
reprofile the current capital programme for the period 2024/25 to 2028/29 based
on current programme delivery plans. This current loan charge variance is made
up of: 
• A net treasury management interest and expenses increased spend of £2.1m
is projected (General Fund £2.1m), which is a primarily a reflection of
increased internal IORB charges, and incorporates cashflow management
techniques adopted, e.g. directing the timing of new borrowing, managing
investment security, liquidity and interest rate risk. 
• In 2025/26 it is anticipated there will be a minor decrease in anticipated loans
fund advance repayments of £0.2m (£0.1m General Fund, HRA £0.1m). This
is primarily due to lower capital borrowing incurred in 2024/25 and revised
average loan pool rates from previously forecast. 
(x) Indicator 2(c) relates to the level of fixed debt due to mature within time periods.
The level of debt maturing remains within the upper limits set for each category
at the beginning of the financial year. 
(xi) The Liability Benchmark at Appendix 3. The Treasury Management Code states
that organisations should evaluate the amount, timing and maturities needed for
new borrowing in relation to planned borrowing needs, in order to avoid borrowing
too much, too little, too long or too short. The liability benchmark is an important
tool to help establish whether the Council is likely to be a long-term borrower or
long-term investor in the future and so shapes its strategic focus and decision
making. Essentially this benchmark identifies the projection of external
debt/borrowing required over the long term to fund approved revenue & capital
budgets, while keeping treasury investments at the minimum level required to
manage day-to-day cash. 
(xii) This represents the comparison of the Council’s actual borrowing against an
alternative strategy. This utilises the forecasts for Capital Financing Requirement,
long-term liabilities, current external borrowing, balance sheet resources i.e.
reserves, and that cash and investment balances are kept to a minimum of
£30.0m at each year-end to maintain sufficient liquidity but minimise credit risk. 
(xiii) The Loans CFR (solid light blue) represents the total cost of the capital
expenditure plans based on the estimated current profile of the 5-year Capital
Programme 2024-2025 to 2028-2029 as approved by Policy & Strategy
Committee on 13th March 2025. This reduces over time as scheduled principal
repayments are made to the loans fund. The Net Loans Requirement (dotted red
line) represents the minimum external borrowing required to fund the current
capital expenditure plans assuming all cash reserves and balances are utilised
to offset borrowing requirements. The Liability Benchmark (solid red line)
31/3/25
Actual
£m
31/3/26
Forecast
£m
31/3/27
Forecast
£m
31/3/28
Forecast
£m
31/3/29
Forecast
£m
31/3/30
Forecast
£m
Loans CFR 1,262.7 1,433.5 1,715.0 1,929.3 2,217.8 2,409.3
less Balance Sheet Resources (356.5) (360.3) (343.4) (284.3) (265.0) (273.3)
Net Loans Requirement 906.1 1,073.1 1,371.6 1,645.0 1,952.8 2,136.0
plus: Liquidity Allowance 30.0 30.0 30.0 30.0 30.0 30.0
Liability Benchmark 936.1 1,103.1 1,401.6 1,675.0 1,982.8 2,166.0
Existing Borrowing 987.6 789.4 645.6 589.7 537.9 486.6
New Borrowing Required 0.0 313.8 756.0 1,085.3 1,444.9 1,679.4
Page 182 of 292

Page 183

represents the estimated borrowing required, taken account of liquidity allowance
required of £30.0m to be held to maintain liquidity and to manage day-to-day
cashflows. 
(xiv) The solid grey section shows the maturity profile of current borrowing. The gap
between the grey section and the liability benchmark line represents the
estimated additional borrowing that is forecast will be required to fund the current
capital expenditure plans, via long-term and short-term borrowing options. 
3. Measures of success 
3.1  Overall the approach adopted by the Council’s Treasury Management team during the
quarter under review met the key requirements of the 2025/26 Treasury Management
Strategy. Prudential indicators have remained in accordance with those approved by
Committee on 26 February 2025. The projected final outturn illustrates a healthy
prudential margin and borrowing levels that are below sustainable limits, ensuring that
the projected capital investment levels remain affordable and sustainable. However,
the current financial volatility and increased borrowing costs has resulted in an
assessment being undertaken of the potential impact on future years of the current
capital programme. This will continue to be monitored to determine if any further review
of the programme is required to ensure that it remains sustainably affordable. 
4. Supporting documentation 
4.1 Appendix 1: Loans, Long term Liabilities & Investments as at 30 June 2025
4.2 Appendix 2: Summary of Treasury and Prudential Indicators as at quarter ended 30   
June 2025
4.3 Appendix 3: Liability Benchmark as at quarter ended 30 June 2025 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 183 of 292

Page 184

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Financial impacts are outlined within the report.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 184 of 292

Page 185

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
As the Council borrows and invests significant sums of money it is exposed to
financial risks including the loss of invested funds and the revenue effect of changing
interest rates. Therefore, successful identification, monitoring and control of risk
remains central to the Council’s treasury management strategy. 
Treasury Management activity by its very nature has a number of inherent risks
including interest rate, liquidity and refinancing risks. To minimise risk for its treasury
management activities the Council adopts and operates in accordance with the
guidelines for best practice prescribed within the CIPFA “Treasury Management in
the Public Services” Code of Practice and the CIPFA Prudential Code for Capital
Finance in Local Authorities.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.  
Page 185 of 292

Page 186

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 186 of 292

Page 187

LOANS, LONG TERM LIABILITIES & INVESTMENTS AS AT 30 JUNE 2025                                                                       Appendix 1
DEBT RESTRUCTURING   
BALANCE        
1-April-25
EARLY
REDEMPTION REFINANCING
NEW
BORROWING /
LONG-TERM
LIABILITIES
PRINCIPAL
REPAYMENTS
NET CASH
MOVEMENTS
BALANCE
30-June-25
(1) (2) (3) (4) (5) (6) (7)
LONG-TERM LOANS
PWLB 710,123,329 0 0 20,000,000 (9,190,915) 10,809,085 720,932,415
MONEY MARKET LOANS 54,000,000 0 0 0 0 0 54,000,000
LOBO 3,000,000 0 0 0 0 0 3,000,000
ENERGY EFFICIENCY LOAN 481,519 0 0 0 (98,006) (98,006) 383,513
767,604,849 0 0 20,000,000 (9,288,921) 10,711,079 778,315,927
SHORT-TERM LOANS
TEMPORARY 220,000,000 0 0 61,000,000 (66,500,000) (5,500,000) 214,500,000
MUNICIPAL BANK 0 0 0 0 0 0 0
INTERNAL LOANS 6,280 0 0 0 0 0 6,280
220,006,280 0 0 61,000,000 (66,500,000) (5,500,000) 214,506,280
LONG -TERM LIABILITIES
FINANCE LEASE OBLIGATIONS 1,055,925 0 0 0 (249,934) (249,934) 805,990
LONG TERM LIABILITY 292,200,604 0 0 0 (3,297,084) (3,297,084) 288,903,520
293,256,529 0 0 0 (3,547,018) (3,547,018) 289,709,510
TOTAL EXTERNAL DEBT 1,280,867,657 0 0 81,000,000 (79,335,939) 1,664,061 1,282,531,718
INVESTMENTS
THIRD PARTY ADVANCES 1,135,267 0 0 0 (12,241) (12,241) 1,123,026
BANKS & OTHER FINANCIAL INSTITUTIONS 81,501,698 0 0 0 0 15,757,936 97,259,635
UNCLEARED BALANCES INCL CASH IN TRANSIT (36,981,791) 0 0 0 0 27,297,816 (9,683,975)
CASH & CASH EQUIVALENTS 45,655,175 0 0 0 (12,241) 43,043,511 88,698,686
NET BORROWING 1,235,212,482 0 0 81,000,000 79,323,698 (41,379,451) 1,193,833,032
Page 187 of 292

Page 188

Appendix 2  
Summary of Treasury and Prudential Indicators as at quarter ended 30 June 2025
1. Prudential Indicators
(a) Capital Expenditure Initial
Estimate
2025/2026
(£m)
Projected 
Outturn 
2025/2026 
(£m)
Variance
2025/2026
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
Forecast 
2029/2030 
(£m)
Capital Expenditure: General Services 153.4 178.6 25.2 166.1 133.8 246.4 104.6
Capital Expenditure: HRA 125.8 140.1 14.3 220.3 189.5 157.6 179.4
Total spend : Capital Expenditure 279.2 318.7 39.5 386.4 323.3 404.0 284.0
Total spend : Credit Arrangement 14.4 14.0 (0.4) 15.9 16.2 15.5 15.5
Total Capital Investment 293.6 332.7 39.1 402.3 339.5 419.5 299.5
Financed By:     
Capital Grants & Other External Contributions 59.5 72.7 13.2 52.3 52.6 54.9 30.0
Capital from Current Revenue 46.8 47.3 0.5 20.1 20.1 20.1 20.1
Capital receipts 3.4 1.7 (1.7) 3.4 3.4 3.4 0.0
Capital receipts transfer to Capital Fund 0.0 0.0 0.0 0.0 0.0 0.0 0.0
CFR : Borrowing - General Services 84.1 100.7 16.6 127.4 94.8 205.1 91.6
CFR : Borrowing - HRA 85.4 96.3 10.9 183.2 152.4 120.5 142.3
Credit Arrangements 14.4 14.0 (0.4) 15.9 16.2 15.5 15.5
(b) Capital Financing Requirement (CFR) Initial
Estimate
2025/2026
(£m)
Projected 
Outturn 
2025/2026 
(£m)
Variance
2025/2026
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
Forecast 
2029/2030 
(£m)
General Services 1,080.8 1,085.0 4.2 1,198.7 1,278.0 1,463.8 1,533.8
HRA 640.6 643.7 3.1 811.0 945.4 1,045.4 1,164.7
Total CFR 1,721.4 1,728.7 7.3 2,009.7 2,223.4 2,509.2 2,698.5
Movement in CFR 143.8 171.0 281.0 213.7 285.8 189.3
(c) Gross Debt and the Capital Financing Requirement Initial
Estimate
2025/2026
(£m)
Projected 
Outturn 
2025/2026 
(£m)
Variance
2025/2026
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
Forecast 
2029/2030 
(£m)
Gross Borrowing : Loan Debt 1,186.8 1,170.4 (16.4) 1,468.1 1,740.7 2,047.9 2,232.7
Long-term Liabilites 294.0 295.2 1.2 294.7 294.1 291.4 289.3
Gross Debt 1,480.8 1,465.6 (15.2) 1,762.8 2,034.8 2,339.3 2,522.0
Capital Financing Requirement 1,721.4 1,728.7 7.3 2,009.7 2,223.4 2,509.2 2,698.5
Prudential Margin 240.6 263.1 22.5 246.9 188.6 169.9 176.5
Page 188 of 292

Page 189

Appendix 2 (cont) 
Summary of Treasury and Prudential Indicators as at quarter ended 30 June 2025
1. Prudential Indicators
(d) Authorised Limit and Operational Boundary Initial
Authorised
Limit
2025/2026
(£m)
Initial
Operational
Boundary
2025/2026
(£m)
Maximum
Borrowing
Level Q1
2025/2026
(£m)
Borrowing 1,505.0 1,455.0 996.8
Other Long-term Liabilities 325.0 325.0 289.7
Total Debt 1,830.0 1,780.0 1,286.5
(e) Proportion of Financing Costs to Net Revenue Stream
Initial
Estimate
2025/2026
(£m)
Projected 
Outturn 
2025/2026 
(£m)
Variance
2025/2026
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
Forecast 
2029/2030 
(£m)
General Fund Loan Charges 46.6 48.5 1.9 53.4 62.2 70.7 83.3
General Fund Finance Lease/PPP Costs 15.3 15.3 0.0 15.1 14.8 14.6 14.1
General Fund : Capital Financing Costs 61.9 63.8 1.9 68.5 77.0 85.3 97.4
General Fund : Net Revenue Stream 1,068.8 1,068.8 0.0 1,068.8 1,068.8 1,068.8 1,068.8
Proportion of Financing Costs to Net Revenue Stream - GF 5.8% 6.0% 0.2% 6.4% 7.2% 8.0% 9.1%
Proportion of Financing Costs to Net Revenue Stream
Initial
Estimate
2025/2026
(£m)
Projected 
Outturn 
2025/2026 
(£m)
Variance
2025/2026
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
Forecast 
2029/2030 
(£m)
HRA Loan Charges 43.3 43.2 (0.1) 48.5 59.5 71.5 79.5
HRA Finance Lease/PPP Costs 0.3 0.3 0.0 0.3 0.3 0.3 0.0
HRA : Capital Financing Costs 43.6 43.5 (0.1) 48.8 59.8 71.8 79.5
HRA : Net Revenue Stream 171.9 171.9 0.0 175.3 188.6 201.6 209.2
Proportion of Financing Costs to Net Revenue Stream - HRA 25.4% 25.3% (0.1%) 27.8% 31.7% 35.6% 38.0%
Page 189 of 292

Page 190

Appendix 2 (cont) 
Summary of Treasury and Prudential Indicators as at quarter ended 30 June 2025
2. Treasury Management Indicators
a) Interest Rate Exposures on External Interest Payments Position as at
30/06/2025
(£m) %
External Interest Payable on Fixed Rate Loan Debt 46.2 99.5%
External Interest Payable on Variable Rate Loan Debt 0.3 0.5%
b) Loans Fund Revenue Account Initial
Estimate
2025/2026
(£m)
Projected 
Outturn 
2025/2026 
(£m)
Variance
2025/2026
(£m) %age
Loans Fund Interest Payments 64.6 66.9 (2.3) (3.6%)
Loans Fund Expenses 0.4 0.4 0.0 0.0%
Total Loans Interest Payments & Expenses 65.0 67.3 (2.3) (3.5%)
Loans Funds Investment Income (1.5) (1.7) 0.2 (13.3%)
Total Loans Fund Interest Payments Investment Income & Expenses 63.5 65.6 (2.1) (3.3%)
Allocated as follows :
Loans Fund Interest Payments Investment Income & Expenses:General Fund 34.4 36.5 (2.1) (6.1%)
Loans Fund Interest Payments Investment Income & Expenses:HRA 29.1 29.1 0.0 0.0%
Capital Advances Repayments -  General Fund 12.2 12.1 0.1 0.8%
Capital Advances Repayments -  HRA 14.2 14.1 0.1 0.7%
Total Capital Advances 26.4 26.2 0.2 0.8%
Total Loan Charges 89.9 91.8 (1.9) (2.1%)
c) Maturity Structure of Borrowing
<12months
12 months to
2 years 2 to 5 years 5 to 10 years
10 to 20
years
20 to 40
years >40 years
Upper Limit maturing :Fixed & Variable Rate Debt 15.0% 15.0% 25.0% 30.0% 35.0% 45.0% 30.0%
Lower Limit maturing :Fixed & Variable Rate Debt 0.0% 0.0% 5.0% 5.0% 5.0% 10.0% 10.0%
Maturity structure at the start of Q1 10.2% 7.8% 19.6% 27.7% 9.8% 21.6% 3.4%
Maturity structure at the end of  Q1 10.5% 7.9% 20.4% 27.9% 10.0% 20.0% 3.3%   
Page 190 of 292

Page 191

Appendix 3 
0
500
1,000
1,500
2,000
2,500
3,000
2024 2026 2028 2030 2032 2034 2036 2038 2040 2042 2044 2046 2048 2050 2052 2054
£m
Liability Benchmark - North Lanarkshire
Fixed rate loans LOBO loans Loans CFR Liability benchmark Net loans requirement
Page 191 of 292

Page 192

Page 192 of 292

Page 193

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/KS/RM Date 10/09/25 
Treasury Management Annual Activity Report – 2024/2025 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail McnameeR@northlan.gov.uk Telephone Ryan McNamee, Finance
Manager 
1. Background 
1.1 The Council is required to meet a number of key reporting requirements for Treasury
Management in accordance with the CIPFA Code of Practice on Treasury Management
and the CIPFA Prudential Code for Capital Finance in Local Authorities.  
1.2 This report fulfils one of these requirements, outlining the treasury management activity
undertaken during 2024/2025 and the resulting impact on the Council’s borrowing and
Executive Summary
This report fulfils the key requirements of the Council’s reporting procedures for Treasury
Management in accordance with the CIPFA Code of Practice on Treasury Management
and the CIPFA Prudential Code for Capital Finance in Local Authorities in that it: 
• Outlines the treasury management activity undertaken during 2024/2025 and the
resulting impact on the Council’s borrowing and investment strategy. 
• Reports on the Council’s performance in complying with the mandatory prudential
indicators.
• Provides a detailed summary of the Council’s performance, making reference to those
targets and prudential indicators set at the start of the year within the approved
strategy.
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledges the Treasury Management activity undertaken during 2024/2025
and its resulting impact on the Council’s borrowing and investment strategy set out
within Appendix 1 to this report. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 16
Page 193 of 292

Page 194

investment strategy and the Council’s performance in complying with the mandatory
treasury and prudential indicators. 
2. Report 
2.1 The Treasury Management Strategy Statement 2024/2025 approved by Committee on
28 February 2024, set out the Treasury Management policies, practices and activities
to be undertaken by the Treasury Management function during 2024/2025 
2.2 Appendix 1 provides a detailed summary of the Council’s performance, referencing
those targets and prudential indicators set at the start of the year within the approved
strategy. 
2.3 It focuses on the key areas of Treasury Management activity during 2024/2025
including: 
• External Borrowing
• Interest Rates & Payments
• Debt Maturity Profile  
• Investment Performance
• Sources of Borrowing
• Leasing  
• Regulatory Framework, Risk and Performance 
2.4 The Council’s Treasury Management activity continued to be managed in the light of
the market conditions, to take advantage of lower interest rates for borrowing where
possible, while minimising the level of investment balances held, with the Council’s
average loans pool rate increasing from 4.45% to 4.87% due to increasing market
interest rates throughout 2024/25. 
3. Measures of success 
3.1 Overall, the approach adopted by the Council’s Treasury Management team met the
key requirements of the 2023/2024 Treasury Management Strategy.   
4. Supporting documentation 
4.1 Appendix 1:  Treasury Management Annual Activity Report 2024/2025 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 194 of 292

Page 195

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Financial impacts are outlined within the report.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 195 of 292

Page 196

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
As the Council borrows and invests significant sums of money it is exposed to
financial risks including the loss of invested funds and the revenue effect of changing
interest rates. Therefore, successful identification, monitoring and control of risk
remains central to the Council’s treasury management strategy. 
Treasury Management activity by its very nature has a number of inherent risks
including interest rate, liquidity and refinancing risks. To minimise risk for its treasury
management activities the Council adopts and operates in accordance with the
guidelines for best practice prescribed within the CIPFA “Treasury Management in
the Public Services” Code of Practice and the CIPFA Prudential Code for Capital
Finance in Local Authorities. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 196 of 292

Page 197

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 197 of 292

Page 198

Appendix 1 
Treasury Management
Annual Activity Report
2024/2025
Page 198 of 292

Page 199

Appendix 1 
Index
1. Introduction 
2. Background
3. Borrowing Requirement 2024/2025
4. Economic Background & Interest Rates 2024/2025
5. Interest Payments 2024/2025
6. Debt Maturity Profile
7. Sources of Borrowing
8. Debt Rescheduling
9. The Prudential Code for Capital Finance 
10. Temporary Funds Investment Performance 
11. Leasing 
12. Soft Loans
13. Financial Guarantee
14. Treasury Management Advisory Service
15. Policy on Repayment of Loans Fund Advances
2024/2025
16. Regulatory Framework, Risk and Performance
Page 199 of 292

Page 200

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
1.  Introduction
1.1 Treasury Management deals with the borrowing and investment activity of the Council
and is an integral part of the Council’s Financial Strategy. It seeks to ensure that both
capital borrowing requirements and day to day revenue transactions are fully funded.
Its importance has increased as a result of the additional freedoms provided by the
Prudential Code.
1.2 The Council’s treasury activities are strictly regulated by statutory requirements and a
professional code of practice. Revised editions of the CIPFA Prudential Code and
CIPFA Treasury Management Code of Practice were issued in December 2021. In
accordance with the Council’s financial regulations, the Council adopts the fully revised
CIPFA “Treasury Management in the Public Services” Code of Practice (the Code)
including the key principles and the Treasury Management Policy statement.
1.3 Within the Council, the Audit and Scrutiny Panel ensures the effective scrutiny of the
treasury management strategy and policies, while the Finance and Resources
Committee remains responsible for the development of the Strategy, its implementation
and monitoring. The Council also promotes members’ responsibility in this area,
requiring greater member scrutiny of treasury management activity.
1.4 The Code of Practice requires the Council to produce reports on its Treasury
Management policies, practices and activities, including, as a minimum, an annual
strategic plan at the beginning of the financial year, a mid-year review, followed by an
annual report on the measurement of success at the year-end. To ensure compliance
with the Code of Practice, Treasury Management procedures are continually reviewed
with any amendments reported to Committee as appropriate. Prudential arrangements
and treasury management performance information is submitted to Committee on a
quarterly basis.
2.  Background
2.1 The Council has adopted the CIPFA Code of Practice in Treasury Management and
operates its treasury services to mitigate the effect of possible risk in this function, while
undertaking borrowing and investment activities that are prudent, affordable and
sustainable.
2.2 As noted in 1.4 above, the Code of Practice requires the Council to produce reports on
its Treasury Management policies, practices and activities on a regular and ongoing
basis. This includes the preparation of an annual activity report providing a detailed
summary of the Council’s performance, making reference to those targets, limits and
indicators set at the start of the year within the approved strategy.
2.3 In accordance with the Council’s Treasury Management policy, the report focuses on
activities undertaken during the year in the following key areas:- 
• External Borrowing • Interest Rates
• Interest Payments • Debt Maturity Profile
• Sources of Borrowing • Debt Rescheduling
• Temporary Investments • Leasing
• Compliance with the Prudential Code
• Regulatory Framework, Risk and Performance
Page 200 of 292

Page 201

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
3.  Borrowing Requirement 2024/2025
Capital Borrowing Requirement
3.1 The Treasury Management Strategy for 2024/2025, approved by the Finance &
Resources Committee on 28 February 2024, indicated a capital programme of
£312.3m. The capital expenditure programme was budgeted to be funded by external
grants & contributions of £72.1m, capital contributions from revenue of £20.1m and
capital receipts of £3.3m, resulting in a projected increase in the capital borrowing
requirement of £216.8m. 
3.2 The actual total investment in council assets during 2024/2025, amounted to £212.8m,
which was partially funded by external grants and receipts of £70.9m, capital
contributions from revenue of £24.7m and capital receipts of £6.4m, resulting in a
capital borrowing requirement totalling £110.8m to support this capital investment,
which is £106.0m lower than the initial estimate and £21.5m less than the revised
estimate reported at Q3.
3.3 This reduction in capital expenditure and reduced capital financing requirement is
primarily a result of the Council experiencing challenges in delivering the Strategic
Capital Investment Programme and HRA Investment Programme in light of a number
of external factors affecting the wider economy including availability of materials,
contractors and inflationary pressures. This resulted in reduced capacity for external
contractors to deliver projects within previously assumed timelines, and increased
material costs. As a result, decisions were taken by the Policy & Strategy Committee
on 14 March 2024, Housing Committee on 14 February 2024 and Strategic Capital
Delivery Group (SCDG) at its meetings on the October 2024 and January 2025, to
reduce the overall capital programme and re-profile the capital programme to reflect
revised delivery timescales. This resulted in reductions in the budgeted capital
programme throughout 2024/25, and final expenditure resulted in slippage that will be
re-profiled to 2025/26.
3.4 The revised estimates contained within this report when compared to the initial
estimates reflect the impact of Policy & Strategy Committee, Housing Committee and
SCDG decisions and were approved within the Treasury Management Strategy
2025/2026 and Prudential Indicators 2025/26 to 2029/2030, approved by the Finance
& Resources Committee on 26 February 2025. For comparison of the estimate to actual
outturn, unless otherwise stated, the comparator adopted within this report is the actual
outturn to the revised estimate reported at Q3.     
3.5 Members have received reports throughout the year advising them of anticipated
variations to the capital expenditure programmes and resource levels. 
3.6 As highlighted in Table 3 included within Section 9 which outlines the Prudential Code
for Capital Finance requirements, the resource mix to finance the 2024/2025 capital
expenditure programme varied from the original estimate, primarily due to increases in
CFCR contributions of £4.6m, Credit Arrangements of £9.0m and Capital Receipts of
£3.1m partly offset by a decrease in net capital grants and external contributions
available of (£1.2m). 
Capital Financing Requirement 2024/2025
3.7 The 2024/2025 capital financing requirement of £110.8m was funded primarily by a
combination of internal balances/reserves, short-term borrowing(<1year) and long-term
borrowing from the Public Works Loan Board (PWLB).  A full summary is provided
within Section 7 Sources of Borrowing.
Page 201 of 292

Page 202

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
4.  Economic Background & Interest Rates 2024/2025
4.1 Both the UK and US elected new governments during the period, whose policy
decisions impacted the economic outlook. The Chancellor of the Exchequer delivered
her Spring Statement in March 2025, following her Budget in October 2024. Based on
the plans announced, the Office for Budget Responsibility downgraded its predictions
for UK growth in 2025 to 1% from 2%. However, it upgraded its predictions for the four
subsequent years. Inflation predictions for 2025 were pushed up, to 3.2% from 2.6%,
before seen as falling back to target in 2027. The market reaction to the Spring
Statement was more muted compared to the Budget, with very recent market
turbulence being driven more by US trade policy decisions and President Trump.
4.2 UK annual Consumer Price Index (CPI) inflation continued to stay above the 2% Bank
of England (BoE) target in the later part of the period. The Office for National Statistics
(ONS) reported headline consumer prices at 2.6% in March 2025, down from 3.0% in
January 2025 and below expectations. Core CPI also remained elevated, falling slightly
in March to 3.4% from 3.7% in January.
4.3 The UK economy Gross Domestic Product (GDP) grew by 0.1% between October and
December 2024, unrevised from the initial estimate. This was an improvement on the
zero growth in the previous quarter, but down from the 0.4% growth between April and
June 2024. Of the monthly GDP figures, the economy was estimated to have
contracted by 0.1% in January, worse than expectations for a 0.1% gain however in
surprising news, February GDP grew 0.5%, exceeding expectations of 0.1% growth.
4.4 The labour market continued to cool, but the ONS data still require treating with caution.
Recent data showed the unemployment rate rose to 4.5% (3mth/year) in the three
months to March 2025 while the economic inactivity rate fell again to 21.4%. The ONS
reported pay growth over the same three-month period at 5.6% for regular earnings
(excluding bonuses) and 5.5% for total earnings.
4.5 The BoE’s Monetary Policy Committee (MPC) held Base Rate at 4.5% at its March
2025 meeting, having reduced it in February. This follows earlier 0.25% cuts in
November 2024 and August 2024 from the 5.25% peak. At the March MPC meeting,
members voted 8-1 to maintain Base Rate at 4.5%, with the one dissenter preferring
another 25 basis points cut. The meeting minutes implied a slightly more hawkish tilt
compared to February when two MPC members wanted a 50bps cut. In the minutes,
the Bank also upgraded its Q1 2025 GDP forecast to around 0.25% from the previous
estimate of 0.1%.
4.6 The February Monetary Policy Report (MPR) showed the BoE expected GDP growth
in 2025 to be significantly weaker compared to the November MPR. GDP is forecast to
rise by 0.1% in Q1 2025, less than the previous estimate of 0.4%. Four-quarter GDP
growth is expected to pick up from the middle of 2025, to over 1.5% by the end of the
forecast period. The outlook for CPI inflation showed it remaining above the MPC’s 2%
target throughout 2025. It is expected to hit around 3.5% by June before peaking at
3.7% in Q3 and then easing towards the end of the year but staying above the 2%
target. The unemployment rate was expected to rise steadily to around 4.75% by the
end of the forecast horizon, above the assumed medium-term equilibrium
unemployment rate of 4.5%.
4.7 In global terms, The US Federal Reserve paused its cutting cycle in the first three
months of 2025, having reduced the Fed Funds Rate by 0.25% to a range of 4.25%-
4.50% in December, the third cut in succession. Fed policymakers noted uncertainty
around the economic outlook but were anticipating around 0.50% of further cuts in the
Page 202 of 292

Page 203

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
policy rate in 2025. Economic growth continued to rise at a reasonable pace, expanding
at an annualised rate of 2.4% in Q4 2024 while inflation remained elevated over the
period. However, growth is now expected to weaken by more than previously expected
in 2025, to 1.7% from 2.1%. The uncertainty that President Trump has brought both
before and since his inauguration in January is expected to continue.  The European
Central Bank (ECB) continued its rate cutting cycle over the period, reducing its three
key policy rates by another 0.25% in March, acknowledging that monetary policy is
becoming meaningfully less restrictive. Euro zone inflation has decreased steadily in
2025, falling to 2.2% in March, the lowest level since November 2024. Over the current
calendar year, inflation is expected to average 2.3%. GDP growth stagnated in the last
quarter of the 2024 calendar year, after expanding by 0.4% in the previous quarter. For
2025, economic growth forecasts were revised downwards to 0.9%
4.8 Reflecting the impact of the economic volatility throughout 2024/25, the graph below
illustrates lending interest rates falling throughout the year anticipating and reflecting
Bank of England base rate decreases announced throughout the year to stand at
4.50% in March 2025. The fluctuation in the short-term borrowing rates payable by the
Council for temporary funds (less than 1 year) is influenced by the prevailing market
lending rates, the margin representing the relative supply and demand on any given
day for local authority to local authority borrowing, and the term of borrowing profiled to
the Council’s cashflow requirements.   
4.9 Financial market sentiment was reasonably positive over most of the period, but
economic, financial and geopolitical issues meant the trend of market volatility
remained. In the latter part of the period, volatility increased and bond yields started to
fall following a January peak, as the economic uncertainty around likely US trade policy
4.000
4.250
4.500
4.750
5.000
5.250
5.500
Interest Rate %
2024/2025  Monthly Average market lending rates for  
7 day,  3 months, and 12 months
Base rate 7 day 3 Mths 12 Mths
Page 203 of 292

Page 204

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
impacted financial markets. Yields in the UK and US started to diverge in the last month
of the period, with the former rising around concerns over the fiscal implications on the
UK government from weaker growth, business sentiment and higher rates, while the
latter started falling on potential recession fears due to the unpredictable nature of
policy announcements by the US President and their potential impact.
4.10 After substantial rises in interest rates since 2021 many central banks have now begun
to reduce their policy rates, albeit slowly. Gilt yields were volatile but have increased
overall during the period. Much of the increase has been in response to market
concerns that policies introduced by the UK government will be inflationary and lead to
higher levels of government borrowing. The election of Donald Trump in the US in
November 2024 is also expected to lead to inflationary trade policies.
4.11 The 10-year UK benchmark gilt yield started the period at 3.94% and ended at 4.69%,
having reached a low of 3.76% in September and a high of 4.90% in January in
between. Whilst the 20-year gilt started at 4.40% and ended at 5.22%, hitting a low of
4.27% in September and a high of 5.40% in January. The Sterling Overnight Rate
(SONIA) averaged 4.90% over the period.
4.12 The change in the perception as to how the economy is progressing is more readily
explained by an analysis of the fluctuations in the PWLB medium to long term rates as
per the graph below. 
4.13 The spread between the highest and lowest daily interest rates payable for PWLB 10,
25 and 50 year borrowing periods throughout 2024/2025 were 1.19% for the 10-year
range, 1.10% for 25 year range and 1.00% for the 50 year range. The PWLB certainty
rate for 10-year maturity loans was 4.80% at the beginning of the period and 5.42% at
4.000
4.500
5.000
5.500
6.000
6.500
Interest Rate %
2024/2025 Monthly Average PWLB rates or periods
up to 10, 25 and 50 years 
up to 10 years up to 25 years up to 50 years
Page 204 of 292

Page 205

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
the end. The lowest available 10-year maturity rate was 4.52% and the highest was
5.71%. Rates for 25-year maturity loans ranged from 5.08% to 6.18% during the period,
and 50-year maturity loans from 4.88% to 5.88%. 
4.14 The new HRA PWLB rate which is 0.4% below the currently available certainty rate
was made available from 15th June 2023.  This rate will now be available to March
2026. The discounted rate is to support local authorities borrowing for Housing capital
purposes or refinancing existing HRA loans, providing a window of opportunity for HRA-
related borrowing during this time frame. During 2024/25, borrowing of £75.0m was
taken utilising the HRA discount rate. In conjunction with our treasury advisors, we
continue to review the requirements and assess the borrowing opportunities for the
Council for 2025/26.
4.15 For the majority of the year the cost of short-term borrowing from other local authorities
closely tracked Base Rate at around 5.00% - 5.25%. However from late 2024 rates
began to rise, peaking at around 6% in February and March 2025.
4.16 The period in question ended shortly before US President Donald Trump announced
his package of ‘reciprocal tariffs’, the immediate aftermath of which saw stock prices
and government bond yields falling and introduced further uncertainty over the
economic outlook and possible impacts will be reported in future reports.
5.  Interest Payments 2024/2025
5.1 The Council made interest payments in 2024/2025 of £57.2m (£46.8m in 2023/2024). 
This includes both the external and internal elements of interest payable, and the
annual write-off associated with premiums and discounts. This increase of £10.4m from
2023/2024 levels represents additional net interest costs of £10.2m, comprising an
increase in external interest payable of £7.5m and internal interest on revenue balances
charges of £2.7m, and decreased investment income of £0.2m due to increasing
interest rates throughout the year.  Whilst an increase in costs from previous year, total
costs are primarily managed using a combination of internal balances/reserves and
short-term borrowing(<1yr) which was sourced at lower interest rates, to meet the in-
year capital financing requirement and the refinancing of long-term debt maturing, in
lieu of future long-term borrowing where possible. This reflecting the borrowing strategy
adopted in 2024/2025, which is complimented by efficient cashflow management and
balance sheet analysis and ensures the nature and timing of new borrowing remains
efficient and effective, achieving value for money.
5.2 The Council’s average cost of servicing its debt and investment portfolio has started to
increase in recent years due to rising market interest rates with the weighted average
loans fund pool rate for 2024/25 being 4.87%, an increase of 0.42% when compared
to the average rate of 4.45% for 2023/24.
5.3 Given the term structure of interest rates prevailing throughout the year, the borrowing
strategy adopted minimised carrying costs (see paragraph 9.17 below), whilst
managing liquidity. Whilst the weighted average loans fund pool rate of the Council’s
loan portfolio rose this year, debt costs were retained at prudent levels despite the
significant increase in prudential borrowing rates.  However, with interest rates forecast
to continue to remain high in 2025/2026 and possibly thereafter, this will become more
challenging whilst maintaining the current capital investment programme. 
Page 205 of 292

Page 206

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
6.  Debt Maturity Profile 
6.1 Debt maturity profiles are continually monitored in the management of Treasury
Management risk and in particular refinancing, liquidity and interest rate risk. 
6.2 A summary of the current debt maturity profile is contained in Table 1 below.
Maturity Profile 
2024/2025  2023/2024
£m  %  £m  %
Temporary Borrowing < 1yr 220.0 22.28%  240.8 27.77%
Long term borrowing:     
Maturing in less than 1 Year 78.0 7.90%  35.5 4.10%
Maturing in 1 - 2 Years 60.2 6.10%  36.9 4.26%
Maturing in 2 - 5 Years 150.6 15.24%  105.7 12.19%
Maturing in 5 - 10 Years 212.3 21.49%  153.8 17.74%
Maturing in 10 - 20 Years 74.9 7.58%  95.3 11.00%
Maturing in 20 - 40 Years 165.9 16.79%  173.1 19.96%
Maturing in more than 40 Years 25.8 2.61%  25.8 2.98% 
987.6 100.00%  866.9 100.00%
Table 1
6.3 A graphical presentation of the current long-term debt maturity profile on an annual
basis is shown below. 
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
Millions
FINANCIAL YEAR
Forecast Long-term Debt Maturity Profile as at 31 March 2025
Public Works Loan Board (PWLB) Market Loans SALIX
Page 206 of 292

Page 207

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
6.4 It should be noted that the maturity profile includes variable rate debt which can be
repaid in whole or part at any time up until the maturity date without penalty, further
increasing the flexibility within the repayment profile.  It is currently assumed this debt
will be held to maturity, subject to certain conditions. 
6.5 The graph highlights that for the period 2028/2029 until 2031/2032, the average debt
maturing is lower than earlier years, and after these periods and in a number of later
years there is little or no debt due to be repaid. This may offer opportunities for sourcing
debt within this maturity spectrum as part of future capital financing or debt
restructuring/replacement strategies, dependent upon interest rates and in compliance
with the overall Treasury Management strategy. 
6.6 The graphical presentation of the debt maturity profile excludes short-term borrowing
which was originally sourced to be repaid within 12 months (temporary borrowing < 1
year) per Table 1 above. It also includes principal outstanding for LOBO (Lender’s
Option Borrower’s Option) loans based on their maturity date as opposed to the
potential maturity date in the year where options or calls exist. A LOBO is called when
the lender exercises its right to amend the interest rate on the loan at which point the
Council can accept the revised terms or reject them and repay the loan. 
6.7 At 31 March 2025 the Council had an exposure of £3.0m to LOBO loans, all of which
have call dates falling within less than one year, with interest rates payable ranging
from 10.625% to 10.937%.  This balance of £3.0m, taken out in the mid 1980’s to early
1990’s, having an average interest rate of 10.73%. Based on the current and the
forecast interest rates the likelihood of these loans being called has been assessed as
minimal. In the event that the call option were to be exercised, the default position will
be the repayment of the LOBO without penalty with the associated treasury
management risks (refinancing/interest rate/liquidity) managed in line with the
borrowing strategy for other maturing debt. 
6.8 The graphical presentation below provides a further analysis of the average annual rate
of interest payable on maturing long-term debt. This analysis highlighting possible
opportunities for savings in interest costs over the coming years, as the refinancing
strategy adopted, will look to replace these loans at lower average interest rates than
the historic interest rates currently being paid on the respective debt reaching maturity.
In the years where no loans fall due for repayment this shows as 0.00% within the graph
below. 
0.00%
2.00%
4.00%
6.00%
8.00%
Average Interest Rate of Interest Payable
on Maturing Long term Debt
Page 207 of 292

Page 208

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
7.  Sources of Borrowing
7.1 At the 31 March 2025 the Council’s total external debt, defined as actual gross
borrowing (excluding interest accrued) plus obligations outstanding in respect of
finance leases and Service Concessions liabilities had risen from £1,075.6m to
£1,280.9m, an increase of £205.3m as shown in Table 2 below.
Sources of Finance 
2024/2025  2023/2024
£m  %  £m  %
Public Works Loan Board 710.1 71.8%  568.4 65.5%
Money Market Loans 57.0 5.8%  57.0 6.6%
Temporary Borrowing 220.0 22.3%  240.8 27.8%
Energy Efficiency Loan – Salix 0.5 0.1%  0.7 0.1%
Total Debt Outstanding 987.6 100.0%  866.9 100.0%      
Finance Lease Liabilities (including
IFRS16) 1.1 0.4%  1.3 0.8%
Service Concessions Liabilities 292.2 99.6%  207.4 99.2%
Total Long-term Liabilities 293.3 100.0%  208.7 100.0%      
Total External Debt  1,280.9   1,075.6 
Annual Movement   205.3  
Table 2
7.2 The increase in external debt of £205.3m is primarily due to movements in the total
debt outstanding of £120.7m with PWLB borrowing increasing by £141.7m, due to new
PWLB borrowing of £177.0m offset by PWLB repayments of principal for PWLB of
£35.3m falling due for repayment in 2024/2025 per the terms of the original loan
agreements, a decrease of £20.8m in temporary borrowing, (with transactional activity
in terms of temporary borrowing being £558.8m in total, comprising £269.0m of cash
received and £289.8m of cash being repaid during 2024/2025) and repayment of £0.3m
in respect of energy efficiency loans from Salix.
7.3 In addition, within 2024/25 there was an increase in long term liabilities of £84.6m which
was due to the implementation of IFRS16 Leases in 2024/2025 which requires the re-
measurement of PPP liabilities on transition on 1 April 2024 and annually thereafter
which resulted in an increase of £88.3m recognised in 2024/2025.  In addition, the
Service Concession flexibility available through Finance Circular 10/2022 (Finance
Leases and Service Concession Arrangements) which was implemented in 2023/24,
which allowed the Council to amend statutory repayment of principal elements of the
lease component of service concession arrangements over the estimated asset lives
instead of the contractual period.  The value of this deferral relating to 2024/2025 was
£9.4m.  These were offset by contractual repayments in respect of the finance lease
and Service Concessions liabilities of £13.1m. 
7.4 The above approach to borrowing in 2024/2025 was underpinned by: 
• interest rate expectations; 
• the management of carrying costs; 
Page 208 of 292

Page 209

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
• the spend profile of the Capital Investment programme; and 
• managing reserves and balances at prudent levels in lieu of external borrowing.
8. Debt Rescheduling
8.1  Debt rescheduling is defined as the reorganisation of existing debt in such a way as to
amend the debt repayment profile of the authority, reduce the principal sum borrowed,
alter the degree of volatility of the debt or vary the interest charge payable.
8.2 During 2024/2025, the economic climate in relation to our financial targets and Treasury
Management strategy was monitored. The interest rates prevailing throughout the
period resulted in no beneficial opportunities for debt restructuring/rescheduling of the
PWLB debt portfolio.
8.3  A decision taken by the PWLB in October 2010 to increase interest rates, by an average
of 0.90% above UK Government gilts, across the whole maturity spectrum for new
PWLB fixed and variable rate loans from 1 year up to 50 years continues to significantly
limit opportunities.
9.  The Prudential Code for Capital Finance 
Prudential Indicators
9.1 Following the introduction of the Local Government in Scotland Act 2003 and the
Prudential Code for Capital Finance in Local Authorities, the Treasury Management
Strategy Statement 2024/2025 detailed the mandatory prudential indicators, essential
for ensuring that the Council's capital programmes were affordable, prudent and
sustainable.
9.2 The Council approved a variety of indicators, including revised estimates for the
financial years 2024/2025 through to 2028/2029. The total capital investment in
2024/2025 was £310.5m. A summary as to how this was financed is provided in Table
3 below.
Table 3  
Capital Expenditure
2024/2025
Initial
Estimate
(£m)
2024/2025
Revised
Estimate
(£m)
2024/2025
Actual
(£m) 
Variance
(£m)
Expenditure on assets  312.3 239.6 212.8 26.8
Credit Arrangements 88.7 88.6 97.7 (9.1)
Total Capital Investment  401.0 328.2 310.5 17.7
Financed by  
Borrowing 216.8 132.3 110.8 (21.5)
Capital receipts 3.3 6.4 6.4 -
Grants & External Contributions 72.1 55.8 70.9 15.1
CFCR 20.1 45.1 24.7 (20.4)
Credit Arrangements 88.7 88.6 97.7 9.1
Page 209 of 292

Page 210

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
9.3 The Capital Financing Requirement (CFR) which is a measure of the Council’s
underlying borrowing need, comprising borrowing and credit arrangements, was
£22.3m less than anticipated as at 31 March 2025, compared to the revised estimate
as shown in Table 4. The CFR is split between General Services and HRA which
reflects actual debt outstanding as at 31 March 2025. 
Capital Financing
Requirement 
31 March 2025
Initial  
Estimate
(£m)
31 March 2025
Revised
Estimate
(£m)
31 March 2025
Actual
(£m)                   
Variance
(£m)
General Services 1,081.8 1,008.6 994.2 14.4
HRA  603.8 569.6 561.7 7.9
Total CFR 1,685.6 1,578.2 1,555.9 22.3
Table 4
9.4 This 2024/2025 decreased borrowing requirement (CFR) of £22.3m per Table 4 above
comprises the reduced borrowing for capital expenditure on assets of £21.5m and a
minor £0.7m movement related to measurement of Service Concession liabilities for
2024/25 (see table 5).    
9.5 Per Table 5 below, the external debt position of the Council at the 31 March 2025 was
£15.2m less than expected compared to the revised estimate. The total debt
outstanding was lower than anticipated and healthy cash balances resulted in a
reduced requirement for PWLB and Temporary borrowing of £14.5m to meet daily
cashflow requirements and manage liquidity risks. 
Sources of Finance 
31 March
2025    
Initial
Estimate
31 March
2025
Revised
Estimate
31 March
2025      
Actual Variance
£m  £m  £m  £m 
Public Works Loan Board 847.6 714.6 710.1 4.5
Money Market Loans 57.0 57.0 57.0 -
Energy Efficiency Loan –Salix 0.5 0.5 0.5 -
Temporary Borrowing 242.0 230.0 220.0 10.0
Total Debt Outstanding 1,147.1 1,002.1 987.6 14.5     
Finance Lease Liabilities 1.1 1.1 1.1 -
Service Concessions Liabilities 292.2 292.9 292.2 0.7
Total Long-term Liabilities 293.0 294.0 293.3 0.7     
Total External Debt  1,440.1 1,296.1 1,280.9 15.2 
Table 5
9.6 As a result of the movements in the capital financing requirement and the external debt
position described above, there is a healthy prudential margin of £275.0m (the need to
borrow versus actual borrowing) at the end of 2024/2025, as shown in Table 6 below.
This is consistent with the Council approach to use internal reserves and balances to
Page 210 of 292

Page 211

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
fund the cumulative capital financing position at the 31 March 2025 as an alternative to
undertaking additional external borrowing where possible.   
31 March 2025
Initial  
Estimate
(£m)
31 March 2025
Revised
Estimate
(£m)
31 March 2025
Actual
(£m)
Total CFR 1,685.6 1,578.2 1,555.9
Total External Debt 1,440.1 1,296.1 1,280.9
Prudential Margin 245.5 282.1 275.0           
Table 6
9.7 Table 7 below shows the ratio of capital financing costs to total income for General
Services and HRA. Interest costs were lower than initial estimates due to decreases in
market interest rates led by decreasing base rate during the year outlined within Section
15 below, however apportionment of specific interest costs to General Fund and HRA
of new borrowing undertaken during the year resulted in a minor decrease in ratio for
General Fund of 0.2% and an increase in ratio for HRA of 0.6%. Overall it continues to
reflect the efficient management of investment and borrowing activity demonstrated
throughout this report.  
Proportion of Financing
Costs/Income
31 March 2025    
Initial  
Estimate
31 March 2025      
Actual
General Services 6.0% 5.8%
HRA 23.5% 24.1%
Table 7
9.8 The Authorised Limit is the ‘Affordable Borrowing Limit’ required by S35 of the Local
Government Act 2003. The Council does not have the power to borrow above this level.
The Operational Boundary is the expected borrowing position of the Council during the
year.  Periods where the actual position is either below or above the Operational
Boundary are acceptable subject to the Authorised Limit not being breached. 
Page 211 of 292

Page 212

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
9.9 Table 8 below shows in 2024/2025 the Council has maintained its gross borrowing and
its long-term liabilities within the Authorised Limit and Operational Boundary. 
Approved   
Limit
2024/2025
(£M)
Maximum
held per
2024/2025
Activity
(£M)
Limit
Breached
(Yes/No)
Authorised Limit : Borrowing  1,515.0 987.6 No                             
: Long-term Liabilities  340.0 293.3 No
Operational Boundary : Borrowing   1,465.0 987.6 No                                     
:  Long-term Liabilities 340.0 293.3 No
Total Gross Borrowing at 31.03.2025 987.6  
Total Long-term Liabilities at 31.03.2025 293.3  
External Debt at 31.03.2025 1,280.9  
Table 8
9.10 The external debt includes both the actual gross borrowing and long-term liabilities held
at a specific point in time (i.e. 31 March 2025).
9.11 The Liability Benchmark at Table 10 below is a new indicator.  The Treasury
Management Code states that organisations should evaluate the amount, timing and
maturities needed for new borrowing in relation to planned borrowing needs, in order
to avoid borrowing too much, too little, too long or too short. The liability benchmark is
an important tool to help establish whether the Council is likely to be a long-term
borrower or long-term investor in the future, and so shapes its strategic focus and
decision making. Essentially this benchmark identifies the projection of external
debt/borrowing required over the long term to fund approved revenue & capital budgets,
while keeping treasury investments at the minimum level required to manage day-to-
day cash.
9.12 This represents the comparison of the Council’s actual borrowing against an alternative
strategy. This utilises the forecasts for Capital Financing Requirement, long-term
liabilities, current external borrowing, balance sheet resources i.e. reserves, and that
cash and investment balances are kept to a minimum of £30.0m at each year-end to
maintain sufficient liquidity but minimise credit risk. 
Table 9
31/3/25
Actual
£m
31/3/26
Forecast
£m
31/3/27
Forecast
£m
31/3/28
Forecast
£m
31/3/29
Forecast
£m
31/3/30
Forecast
£m
Loans CFR 1,262.7 1,433.5 1,715.0 1,929.3 2,217.8 2,409.3
less Balance Sheet Resources (356.5) (360.3) (343.4) (284.3) (265.0) (273.3)
Net Loans Requirement 906.1 1,073.1 1,371.6 1,645.0 1,952.8 2,136.0
plus: Liquidity Allowance 30.0 30.0 30.0 30.0 30.0 30.0
Liability Benchmark 936.1 1,103.1 1,401.6 1,675.0 1,982.8 2,166.0
Existing Borrowing 987.6 789.4 645.6 589.7 537.9 486.6
New Borrowing Required 0.0 313.8 756.0 1,085.3 1,444.9 1,679.4
Page 212 of 292

Page 213

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
Table 10
9.13 The Loans CFR (solid light blue) represents the total cost of the capital expenditure
plans based on the estimated current profile of the 5-year Capital Programme
2024/2025 to 2028/2029 as approved by Policy & Strategy Committee on 14th March
2025.  This reduces over time as scheduled principal repayments are made to the loans
fund. The Net Loans Requirement (dotted red line) represents the minimum external
borrowing required to fund the current capital expenditure plans assuming all cash
reserves and balances are utilised to offset borrowing requirements.  The Liability
Benchmark (solid red line) represents the estimated borrowing required, taken account
of liquidity allowance required of £30.0m to be held to maintain liquidity and to manage
day-to-day cashflows.
9.14 The solid grey section shows the maturity profile of current borrowing.  The gap
between the grey section and the liability benchmark line represents the estimated
additional borrowing that is forecast will be required to fund the current capital
expenditure plans, via long-term and short-term borrowing options.  
0
500
1,000
1,500
2,000
2,500
3,000
2025 2027 2029 2031 2033 2035 2037 2039 2041 2043 2045 2047 2049 2051 2053 2055
£m
Liability Benchmark - North Lanarkshire
Fixed rate loans LOBO loans Loans CFR Liability benchmark Net loans requirement
Page 213 of 292

Page 214

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
Treasury Management Indicators
9.15 The Council approved a variety of Treasury Management indicators for the financial
years 2024/2025 through to 2028/2029. Tables 11 and 12 below provide a comparison
of the estimated and actual 2024/2025 Treasury Management indicators.
Interest Category
Initial
Estimate
2024/2025
(£m)
Actual
2024/2025
(£m)
Variance
(£m) %
Interest payable on Fixed Rate Debt 45.1 38.3 6.8 15.1%
Interest payable on Variable Rate Debt 0.3 0.3 0.0  0.0%
Total External Interest Payments 45.5 38.6 6.8 14.9%
Interest Receivable Funds Invested (1.9) (2.8)        0.9 47.4%
Net Loan External Interest Charges 43.6 35.9 7.7 17.7%
Table 11
9.16 Table 11 above provides prudential information in respect of external payments due
and income receivable only as these are under the direct control of the Treasury
Management section. In 2024/2025 there was a reduction of £6.8m in net loan external
interest payments compared to initial estimates for 2024/2025. This favourable
variance was achieved due to the borrowing strategy adopted to meet the revised
General Services and HRA Capital Programme for 2024/25. 
9.17 This interest saving primarily represents the difference between the initial estimate cost
of new long term and temporary borrowing based on an interest rate of 5.20% and
5.43% respectively compared to the actual average interest rates of approximately of
4.76% and 5.03% respectively throughout 2024/2025. Overall a saving was achieved
due to both the actual average rates for both long-term and temporary borrowings being
lower than initial estimates, in conjunction with the level of actual long-term borrowing 
and temporary borrowings undertaken being significantly less than initial estimates at
£177.0m and £220.0m respectively compared to anticipated initial estimates of
£269.0m and £242.0m. This primarily being due to cash balances and reserves, in line
with TM Strategy, being utilised in lieu of future long-term borrowing where possible
and the impact of the challenges to the Strategic Capital Investment programme due
to external supply and inflationary pressures.  
9.18 Table 12 below provides a summary of the Capital Financing charges for both General
Fund and HRA in respect of the loans fund which includes; 
• external payments due and income receivable per Table 9 above
• the annual premium/discount written off for historic and new
rescheduling/refinancing 
• the internal interest payable on revenue balances 
• the capital advance repayments made in the year  
Page 214 of 292

Page 215

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
Capital Financing Charges 
Initial
Estimate
2024/2025
(£m)
Final
Outturn
2024/2025
(£m)
Variance
(£m) %
Loans Fund Interest Payments 58.2 59.6 (1.4) (2.4%)
Loans Fund Expenses 0.4 0.4 0.0 0.0%
Total Loans Interest Payments &
Expenses 58.6 60.0 (1.4) (2.4%)
Loans Funds Investment Income   (1.9) (2.8) 0.9 47.4%
Total Loans Fund Interest Payments
Investment Income & Expenses  56.7 57.2 (0.5) (0.9%)      
Loans Fund Advances Repayments 24.4 24.0 0.4 1.6%      
Total Loans Fund Charges  81.1 81.2 (0.1) (0.1%)
Table 12
9.19 The table above highlights a loan charge overspend of £0.1m compared to the
prudential estimates for 2024/2025 taking into account treasury management activity,
internal Interest on Revenue Balances (IORB) recharges due to current market interest
rates, the loans fund holiday flexibility adopted in 2022/23 and the decisions of the
Policy & Strategy Committee, Housing Committee and SCDG to reduce and reprofile
the capital programme in response to the significant delivery challenges as per para
3.3. 
9.20 Overall a treasury management overspend of £0.5m was incurred, primarily a reflection
of increased internal IORB recharges of £8.1m, offset by reduced external loan interest
payments of £6.9m and increased interest income received of £0.7m. This incorporated
cashflow management techniques adopted, directing the timing of new borrowing,
managing investment security, liquidity and interest rate risk and the identification of
short-term borrowing opportunities.
9.21 The reduction in the Loans Fund advance repayments of £0.4m is primarily due to lower
final outturn capital borrowing in 2023/24 than previously estimated.
9.22 The Council sets interest rate exposure limits to manage the Council’s exposure to the
effects of interest rate changes by limiting the amount of total loans whose interest rate
is not fixed.
Table 13 shows the interest exposure at 31 March 2025. During 2024/2025 at no point
were the limits breached with the average levels being below the upper limits for fixed
rate exposure.  
Page 215 of 292

Page 216

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
Maturity Structure of
Borrowing <12m 12m to
2yrs
2 to     
5yrs
5 to 
10yrs
10 to 
20yrs
20 to    
40yrs >40 yrs
Upper Limit on Fixed
Rate debt 15.0% 15.0% 25.0% 30.0% 35.0% 45.0% 30.0%
Lower Limit on Fixed
Rate debt 0.0% 0.0% 5.0% 5.0% 5.0% 10.0% 5.0%
2024/2025 Average
Profile 7.2% 6.8% 17.3% 26.5%  12.6% 25.6% 3.9%
Maturity Structure at
31/03/2025 10.2% 7.8% 19.6% 27.7%  9.8% 21.6% 3.4%
Table 13
10.  Temporary Funds Investment Performance 
10.1  During 2024/2025 the primary principle governing Council investment criteria was the
security of the investment. After this, the Council ensured that it held sufficient liquidity
in its investments, carefully selecting the maximum periods for which funds could
prudently be committed whilst also applying the Council’s prudential and treasury
management indicators covering the maximum principal sums invested.  
10.2  The Council complied fully with the ratings criteria outlined within the 2024/2025
Treasury Management Strategy, minimising risk in this area by adopting a Lowest
Common Denominator (LCD) approach having a criteria-based counterparty list. This
restricted the Council to only using those counterparties that met a pre-determined
credit-rating level, to which monetary limits were applied. This meant that the
counterparty had to meet all the relevant rating requirements being assessed by its
weakest set of ratings, rather than the strongest.
10.3  Throughout 2024/2025 the Council continued to utilise the research of the world’s
foremost providers of independent credit ratings (Fitch, Moody’s and Standard &
Poors). The ratings provided by these bodies define the likelihood of an investor such
as the Council receiving their money back on the terms in which it was invested.
10.4  The credit ratings of counterparties were monitored regularly. The Council receives
credit rating information from Arlingclose (the Council’s advisors) as and when ratings
change, and the counterparties are checked promptly. If a ratings change results in a
counterparty failing to meet the Council’s strict criteria they are removed immediately
from the list. Similarly, if a counterparty rating is updated and they meet the Council’s
strict criteria they would be added to the list.
10.5  To supplement credit rating information the Council used other operational market
information in line with good practice identified within the Code of Practice this includes:
• Credit Default swap prices • Quality financial press • Share prices
• Government support status  • Annual Reports  • Statements to the market 
10.6 In 2024/2025 the Council’s borrowing strategy assisted in minimising counterparty
exposure to the financial markets, the Council strategically deciding the timing of
temporary borrowing and longer-term borrowing, taking into account the levels of
liquidity in conjunction with efficient cashflow management techniques and balance
sheet analysis.
10.7 The approved 2024/2025 Treasury Management Strategy enabled investment activity
for a period up to a maximum limit of 364 days and for certain types of investment up
Page 216 of 292

Page 217

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
to 30 years, for permitted investments per the investment strategy. In ‘normal’ market
circumstances the Council, would identify its liquidity requirements and the core funds
within its daily balances that could be locked in over a longer period, thus achieving the
optimum performance, spreading investment periods and security of return, subject to
the overriding credit counterparty security. 
10.8  During 2024/2025, the Council, restricted its maximum investment periods to
approximately three months, with in reality this period being even shorter. In terms of
investment types the Council primarily deposited funds in call, instant access accounts
and money market funds, dealing directly with approved UK financial institutions. These
accounts offered greater liquidity whereby the Council is allowed instant access whilst
still being offered relatively attractive interest rates compared to sector averages. 
10.9 A comparison of North Lanarkshire Council investment performance for the period April
2024 to March 2025 is shown in the graph below. 
10.10 As shown in the graph above, the overnight market bid rates fell steadily through the
year in response to the decreasing of the Bank of England Base Rate which started the
period at 5.25% and reduced to 4.50% at the end of March. Short term investment rates
peaked at 5.28% for 3-month rates and 5.37% for 12-month rates during the period in
May 2024, although these rates subsequently began to decline towards the end of the
period. Money Market Rates also fell and were between 4.42 and 4.74% by the end of
March 2025.  As a result, the Council managed to achieve a positive return on its
investments. With security and liquidity key factors considered when determining cash-
flow requirements and investment opportunities, the Council only utilised overnight and
very short-term investment options during 2024/25 using its approved counterparties.
Despite this, the Council continued to demonstrate good performance levels in
3.50%
4.00%
4.50%
5.00%
5.50%
Interest Rate
2024/25 Comparison of  NLC Average Interest Rates to
the average Overnight, and 7 Day Bid rates
NLC Interest Rate OVERNIGHT   SONIA Rate
7 Day SONIA BID Rate 1 MONTH SONIA BID Rate
Page 217 of 292

Page 218

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
investment activity when compared to these reliable benchmarks for assessing
performance on temporary investments. 
10.11 During 2024/2025, positive cashflows enabled short-term investments in total of £1.409
billion to be undertaken whilst during the same period, £1.388 billion of short-term
investments matured representing over £2.796 billion in investment activity. 
10.12 The graph below shows the average level of investment balances held throughout
2024/2025, managed on a weekly basis in accordance with the investment strategy,
adhering to the underlying principle of security liquidity and yield supported by robust
cashflow management. 
10.13 Investment balance levels, forming part of the cash and cash equivalents, are
influenced by a number of factors. Liquidity is monitored in conjunction with the
Councils cashflow management reporting system, to manage and forecast future cash
balances available to support the investment and borrowing strategy.
10.14 The Council prides itself on its cashflow management approach with receipts and
payments data recorded daily with forecasts of cash balances readily available. The
cashflow incorporating actual and estimated diary entries for a number of variables
including: 
£0
£10,000,000
£20,000,000
£30,000,000
£40,000,000
£50,000,000
£60,000,000
£70,000,000
£80,000,000
£90,000,000
£100,000,000
1 5 9 13 17 21 25 29 33 37 41 45 49
Weeks 1 - 52
Average Weekly  Investment Balances          
held during 2024/2025
• Payments to Suppliers • Precept Payments • House Rents
• Staff Salaries & Wages • Loan Repayments and
Interest
• Council Tax
• General Government
Grants
• Sales Fees & Charges  • DWP Payments
Page 218 of 292

Page 219

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
10.15 At 31 March 2025, the total balance of cash and cash equivalents amounted to
approximately £58.5m, an increase of £10.2m from last year’s position. A detailed
breakdown is provided below in Table 14, elements of which have been referenced
throughout this report.  
Cash and Cash Equivalents at 31/03/2024 £48.3m 
2024/2025 Borrowing for Capital Expenditure purposes  (£110.8m) Cash Outflow
Repayments of Maturing Long-term debt  (£35.5m) Cash Outflow
Finance Lease Principal repayments (£13.1m) Cash Outflow
Scheduled principal repayments from service departments   £37.1m Cash Inflow
New Long-term borrowing £177.0m Cash Inflow
Increase/(Decrease) in Temporary borrowing (<1yr)   (£20.8m) Cash Outflow
Increase/(Decrease) in Revenue Reserves & Cash
Balances  (£23.7m) Cash Outflow 
Cash and Cash Equivalents at 31/03/2024 £58.5m 
Movement in year £10.2m 
Table 14
10.16  Cash and cash equivalents are represented by cash in hand and deposits held with
financial institutions repayable without penalty on notice of not more than 24 hours
including call accounts and money market funds. This also includes investments that
mature in three months or less from the date of acquisition provided they are assessed
as readily convertible to known amounts of cash with an insignificant risk of a change
in value. The Council’s bank overdraft is also included as this is treated as an integral
part of the council’s day to day cash management procedures.
11.  Leasing
11.1 During 2024/25 the Council used external borrowing to fund its vehicle requirements
with no vehicles, plant and equipment being acquired under operational leasing
agreements in 2024/25.
11.2 At 31 March 2025, the Council is committed to making minimum lease payments of
approximately £1.2m under finance leases with £0.3m due in the next 12 months.
These payments comprise settlement of the long-term liability for the interest in the
asset and the finance costs that will be payable by the Council in future years while the
liability remains outstanding.
11.3 During the year, the Council, for the remaining operating leases for vehicles, plant and
equipment, made actual payments of £4.1m, met from the revenue budget.  
12.  Soft Loans
12.1 Within the Council’s 2024/2025 annual accounts, the Council has recorded a net
amount receivable of £2.2m from service users receiving Social Care for which a
charging order has been placed on the recipient’s property as a method of recovering
the debt. 
12.2 For these amounts payable the Council is charging interest at less than the market rate
applicable for similar advances and as such these balances are notionally recognised
Page 219 of 292

Page 220

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
as soft loans. However, on grounds of materiality, no adjustment for loss of interest has
been made to the balances reported within the annual accounts. 
13. Financial Guarantee
13.1 In 2023/24, the Council agreed to provide a new financial guarantee to North
Lanarkshire Properties LLP (NLP LLP) as part of re-financing arrangements
undertaken by NLP LLP, with the Council providing underwriting of debt service costs,
up to a limit of 80% of the total debt service costs of the new long-term facility of £30.0m. 
The Council considered the likelihood of the guarantee being called as minimal. 
However, the Council, in recognition of this financial guarantee made an initial provision
of £0.825m.
13.2 The financial impact upon the Council of providing this guarantee is negated as the
Council has agreed with the NLP LLP that a premium is payable to the Council for
providing this guarantee, paid in annual instalments, on a fair value basis, over the term
of the loan, with £0.169m charged during 2024/25. The Council has therefore included
a long-term debtor of £0.419m and a short-term debtor of £0.167m within the Balance
Sheet to reflect this arrangement. 
14. Treasury Management Advisory Service
14.1 During 2024/2025 the Council in line with the recommendations of the CIPFA Code of
Practice for Treasury Management continued to use Arlingclose Ltd to provide, as
required, additional specialist skills and resources in managing the Council’s loan debt
and investment portfolio including strategic, economic advice and assistance with the
investment policy. 
15. Policy on Repayment of Loans Fund Advances 2024/2025 
15.1 The Local Authority (Capital Finance and Accounting) (Scotland) Regulations 2016
within Regulation 13 require the Council to make a loans fund advance equal to the
amount of capital expenditure that the Council has determined will be financed by
borrowing. The timing of the borrowing being in accordance with treasury management
principles with the timing not informing when a loans funds advance has been made.
The Capital Expenditure definition being that adopted by proper accounting practice,
the statutory control framework and the Prudential Code.  
15.2 The statutory guidance requires the Council to approve a policy on loans fund
repayments each year. After carrying out an in-house review of the existing Loans Fund
Advance Repayment Policy, in light of the legislation, towards the end of the financial
year 2019/2020, it was decided that to support this exercise that the Council appoint
Link Asset Services (LAS) to carry-out a fuller review of the Council’s loan fund
repayment model in 2020/21. LAS had specific expertise in this area and had carried
out similar process for a number of other Scottish Local Authorities.
15.3 The main objective of the review was to explore options to re-profile loans fund
repayments in order to assist with a prudent, sustainable and deliverable medium-term
financial plan, whilst ensuring that the provision remains prudent and appropriate to the
benefits that accrue to the community from the associated expenditure and is
consistent with the prudential framework.  
15.4 Following the review exercise being completed, a revised approach was recommended
which was approved at the Finance and Resources Committee on the 26 November
2020 with further updates provided within the Treasury Management Strategy 2024/25
Page 220 of 292

Page 221

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
and Prudential Indicators 2024/2025 to 2028/2029 report approved at the Finance and
Resources Committee on the 28 February 2024.
15.5 The revised approach adopts provisions within the 2016 Regulations which allow a
local authority to subsequently vary either the period or the amount of the repayment
(or both) if it considers it prudent to do so.  
Loans Fund Repayment Holiday
15.6 The statutory arrangements for the repayment of borrowing in Scotland, requires the
Council to make an annual repayment of debt which it considers prudent. As an
exceptional measure the Scottish Government had confirmed they would allow
Councils to take a loans fund repayment holiday, the maximum permitted being the
planned repayment for 2022/23, which the Council would be required to repay within
the period of the loan fund advance, but where the loan period exceeds 20 years, within
20 years.
15.7 This flexibility was confirmed through Finance Circular 5/2022 (Statutory Repayment of
Debt – Short Term Financial Flexibility) which afforded the Council the flexibility to defer
statutory repayment of loans fund advances payable within 2022/23.  This flexibility
resulted in a deferral of loan charges of £18.6m across General Fund and HRA and will
be repaid depending on the specific loan advances by the shorter of either the
remaining period of the loans fund advance, or a maximum of twenty years from the
end of 2022/23.  During 2024/25, £0.852m of additional loan charges were repaid as a
result of the flexibility exercised in 2022/23.    
16. Regulatory Framework, Risk and Performance
16.1 The Council’s treasury management activities are regulated by a variety of professional
codes and statutes and guidance.
16.2 The Local Government in Scotland Act 2003 (the Act) provides the powers to borrow
and invest as well as providing controls and limits on this activity. The Act permits
Scottish Ministers to set limits either on the Council or nationally on all local authorities
restricting the amount of borrowing which may be undertaken (although no restrictions
were made in 2021/2022).
16.3 Statutory Instrument (SSI) 29 2003 develops the controls and powers within the Act.
The SSI requires the Council to undertake any borrowing activity with regard to the
CIPFA Prudential Code for Capital Finance in Local Authorities. It also requires the
Council to operate the overall treasury function with regard to the CIPFA Code of
Practice for Treasury Management in the Public Services.
16.4 The Council continues to meet the conditions to opt up to professional status and has
done so in order to maintain this MiFID II status. The Council’s ability to opt up is due
to it having an investment balance of at least £10 million and the person(s) authorised
to make investment decisions on behalf of the authority have at least a year’s relevant
professional experience and the expertise, experience and knowledge to make
investment decisions and understand the risks involved. This status allows the
Authority to access a greater range of products including money market funds, pooled
funds, treasury bills, bonds and shares. 
16.5 The Council has complied with all of the above relevant statutory and regulatory
requirements. This limits the levels of risk associated with its treasury management
activities. In particular, its adoption and implementation of both the Prudential Code and
the Code of Practice for Treasury Management means that its capital expenditure is
Page 221 of 292

Page 222

Treasury Management Annual Activity Report 2024/2025     Appendix 1 
prudent, affordable and sustainable and its treasury practices demonstrate a low-risk
approach.
16.6 The Council is aware of the risks of passive management of the treasury portfolio and
has proactively managed its treasury management position. The Council has continued
to monitor movements in interest rates and has complied with its internal and external
procedural requirements. There is little risk of volatility of costs in the current debt
portfolio as the interest rates are mainly fixed, however new borrowing to support
capital investment will result in higher borrowing costs due to increasing interest rates.
Shorter-term rates and likely future movements in these rates predominantly determine
the Council’s investment return. Since these returns can be volatile, accurately
forecasting future returns can be difficult and the treasury management section monitor
and manage the surplus balances available for investment by efficient cashflow and
liquidity management.
16.7 Overall the approach adopted by the Council’s Treasury Management section
throughout the year under review met the key requirements of the 2024/2025 Treasury
Management Strategy with the performance and results described above
demonstrating the effectiveness of the Council’s Treasury Management activity. 
Page 222 of 292

Page 223

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    FT/KS/FC Date 10/09/25 
2024/25 Annual Outturn 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 07583 010692 
Executive Summary
The purpose of this report is to inform Committee that the annual statutory accounts of the
Council for the year ended 31 March 2025 were reported to the Audit and Scrutiny Panel
at its meeting of 26 June and subsequently submitted to the Council’s External Auditors,
Audit Scotland, by the statutory date of 30 June before being published on the Council’s
website. 
This report also updates Committee on the overall position for the General Fund Account
and explains any major variations against the Council’s annual budget for the year 2024/25. 
An overall summary on the Housing Revenue Account is also provided. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the contents of the report. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 17
Page 223 of 292

Page 224

1. Background 
1.1. The Annual Accounts demonstrate the Council’s stewardship of the public funds with
which it is entrusted. The Annual Accounts are prepared in accordance with the Code
of Practice on Local Authority Accounting in the United Kingdom. The Local Authority
Accounts (Scotland) Regulations, require the Council to submit a set of unaudited
accounts to its external auditors, Audit Scotland, by 30 June following the end of the
financial year. 
1.2. In addition, the Council’s approved Financial Regulations require Council Services to
remain within the approved budgetary provision, and to report all significant deviations
within their budget monitoring reports.   
2. Report 
2.1 The 2024/25 Unaudited Accounts were presented to Audit and Scrutiny Panel on 26
June 2025. Following the meeting the accounts were submitted formally to Audit
Scotland and subsequently published on the Council’s website for public inspection.   
2.2 The General Fund outturned with a deficit of £1.923m which has been added to the
surplus of £283.893m brought forward from 2023/24, resulting in an overall surplus to
be carried forward into 2024/25 of £281.970m. 
2.3 The carried forward General Fund Surplus is represented by £12.563m held in the
Change Management Fund in order to provide for the anticipated one-off costs of
approved savings, £229.516m of earmarked funds held for specific future service
commitments, a balance of £8.000m maintained as the approved contingency fund,
and £31.891m held to support future budget pressures. 
Table 1: 2025/26 Earmarked Funds 
2025/26 Earmarked Funds £m  £m
Change Management Fund    12.563
Schools Future Contractual Obligations 66.330  
Strategic Capital Investment Programme 44.800  
Future Loans Charges linked with Capital Investment
Programme 26.614  
Strategic Workforce Planning 17.709  
Temporary Accommodation 8.038  
Refugee Resettlement Programmes 6.887  
Whole Family Wellbeing 5.313  
Budget One-off Investment 5.289  
One Workforce Grading Pressures 5.000  
Unmanaged burdens within Education, Children &
Families 4.507  
Schools ICT Upgrades linked with Windows 11 2.675  
Balances held by Schools under Devolved School
Management 2.395  
Pupil Equity Fund 1.941  
Early Years & Childcare Expansion 1.881  
Winter Reserve 1.500  
Support of Restructure Realignment of Home to School
Transport 1.500  
Page 224 of 292

Page 225

Economic Recovery 1.400  
Owner Occupier Grants 1.233  
Cumbernauld Town Centre Regeneration 1.042  
Unmanaged burdens within Enterprise & Communities 1.000  
Property Repairs 1.000  
Other Earmarked Funds 21.462  229.51
6
Contingency Fund   8.000
Future Budget Pressures   31.891
General Fund Surplus as at 31 March 2024   281.97
0
2.4 The last reported position for the year to the Business Management Team indicated a
General Fund forecast surplus of £8.331m. When compared with a final outturn deficit
of £1.923m there has been a movement of £10.254m. This is largely represented by
the use of 2024/25 earmarked reserves of £40.493m which includes the £6.901m use
of balances approved as part of the 2023/24 and 2024/25 budget setting process. This
is offset by approved earmarked reserves for use in future years of £29.430m. This
leaves a further movement from the provisional outturn position of £0.809m which
relates to a number of smaller movements across all services. 
2.5 In addition, the Housing Revenue Account (HRA) reported a £3.852m surplus position
at provisional outturn. This position differs from the final outturn of £5.339m surplus
which recognises the approved earmarked reserves for use in future years of £2.885m,
offset by the use of earmarked reserves used in year of £1.398m. The in-year surplus
has increased the balance brought forward resulting in a cumulative surplus of
£22.159m. Of this surplus, £13.156m has already been approved for specific purposes
including £8.501m for Loan Charges covering the repayment of Loan Debt Holiday and
£1.306m for Council Ambition. Adjusting for the £1.742m contingency fund, leaves an
unallocated balance of £7.261m. 
3. Measures of success 
3.1  The Council continues to operate within approved budgeted resources.   
4. Supporting documentation 
4.1 No appendices 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 225 of 292

Page 226

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 226 of 292

Page 227

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 227 of 292

Page 228

Page 228 of 292

Page 229

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/KS Date 10/09/25 
Review of 2025/26 to 2027/28 Budget Savings 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 07583 010692 
1. Background 
1.1. At its meeting of 20 February 2025, the Council approved a General Fund Revenue
Budget of £1,095.241m including expenditure budgets which will be offset by ring
fenced grant resources of £15.296m, resulting in a net expenditure position for
monitoring purposes of £1,079.945m. Following confirmation of Scottish Government
funding for financial year 2025/26, and after reflecting, for monitoring purposes, the
reversal of use of balances in respect of previously approved savings now applied, the
overall total budget is now £1,088.895m. 
1.2. Net savings totalling £5.401m over the financial years 2025/26 to 2027/28 were agreed
within the budgets set on 15 February 2024 and 20 February 2025, with £4.183m
Executive Summary
This report provides the Finance and Resources Committee with an update on the
achievement of the three-year financial savings total of £8.326m approved as part of the
2025/26 budget setting process (£6.628m 2025/26, £1.393m 2026/27 and £0.305m in
2027/28). 
It is projected that £5.894m of the 2025/26 savings (89%) will be delivered within the
financial year, with replacement savings identified to fully address the shortfall of £0.734m. 
In addition, it is currently anticipated that there will be no recurring savings gap arising from
the 2025/26 to 2027/28 approved savings.
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the contents of this report.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement 
Item 18
Page 229 of 292

Page 230

incorporated into the 2025/26 budget and the balance £1.218m in 2026/27. In addition,
Council/Committee decisions of £2.924m have also been agreed over the three-year
period, £2.445m of which will be realised in 2025/26. 
1.3. Services are required to monitor the delivery of their target savings to ensure they
remain within approved budgets and provide periodic progress updates within
individual Service revenue monitoring reports, identifying alternative solutions to any
in-year shortfall envisaged. In addition, Services are required to monitor whether the
original approved saving has been implemented and if not, provide an explanation
along with alternative action required to ensure the recurring financial saving will be
achieved going forward. 
1.4. This report summarises the progress in achieving approved savings for the three-year
period 2025/26 to 2027/28. 
2. Report 
Update on Approved 2025/26 to 2027/28 Savings 
2.1 A summary of the three-year approved savings is provided at appendix 1 along with
the current forecast of savings achievable for each of the years. 
2.2 It is currently anticipated that £5.894m (89%) of approved 2024/25 savings of £6.628m
will be achieved in the current financial year, leaving an in-year savings gap of £0.734m.
Replacement savings and funding has been identified to fully address the shortfall,
which includes management action such as control of vacancies, curtailment of
expenditure and the use of Earmarked Reserves. More information on the savings
unachievable within 2025/26 are detailed at appendix 2, with more information reported
to the relevant service committee. It should be noted that there is no anticipated
recurring budget impact as a result of the in-year savings gap. 
2.3 At this stage there is no anticipated delay or shortfall expected in relation to future year
savings, however these will continue to be monitored with updates reported to
Committee as appropriate. 
3. Measures of success 
3.1  The Council continues to operate within approved budgeted resources. 
4. Supporting documentation 
4.1 Appendix 1 Approved 3 Year Savings Summary 
4.2 Appendix 2 Budget Savings by Exception 2025/26 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 230 of 292

Page 231

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 231 of 292

Page 232

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐  
Page 232 of 292

Page 233

Page 233 of 292

Page 234

Page 234 of 292

Page 235

North Lanarkshire Council
Report
Finance & Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    GT/VR Date 10/09/25 
General Debtors Write-Off 2025/26 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 07583 010692 
1. Background 
1.1  The Council issues invoices annually with an approximate value of £109.263m. Of this
approximately £1.8m relates to Finance, which mainly consists of: - 
• Strategy & Corporate Resources; and
• Housing Benefits Overpayments 
1.2 There will continue to be an appraisal of the outstanding balances to assess those
which are deemed uncollectible. This annual process conforms to Best Practice and is
underpinned by a systematic approach to recovery and a realistic assessment of the
expected collection of outstanding balances. 
Executive Summary
The purpose of this report is to present to Committee a summary of outstanding debtor
accounts which are deemed uncollectable following all attempts at recovery or are not
economically viable to pursue. In accordance with financial guidelines a provision for
expected credit losses has previously been established for the outstanding accounts
highlighted in the report. 
The total recommended for write-off for 2025/26 is £81,104.37.
Recommendations
It is recommended that Finance and Resources Committee:
(1) Acknowledges the decision of the Chief Officer (Finance and Technology) under
delegated responsibilities to write off debts under £500.00 totalling £6,462.99. 
(2) Approve the write-off of all items over £500 to the value of £74,641.38. 
The Plan for North Lanarkshire  
Priority  Improve North Lanarkshire's resource base  
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions  
Programme of Work Statutory / corporate / service requirement  
Item 19
Page 235 of 292

Page 236

2. Report 
2.1 An analysis of the outstanding balances has been conducted and £81,104.37 has been
identified as uncollectable. The write-off can be analysed and compared to the prior
year as shown in the table below: 
2025/26  2024/25 
Benefit Overpayment £80,924.37 £107,117.79
Other Services £180.00 £0.00
Total  £81,104.37 £107,117.79 
2.2 The Chief Officer (Finance & Technology) has exercised powers under the Scheme of
Delegation to write-off those balances which are under £500, which represents
£6,462.99 of the sum identified in paragraph 2.1.   
2.2 The write off figure for 2025/26 has decreased slightly from the value in 2024/25, which
may be indicative of the general reduction in the count and value of invoices being
raised for Housing Benefit Overpayments, as well as the effective debt recovery
strategies adopted by the service. 
2.3 There are several reasons why the outstanding balances are being written off and these
are summarised below: - 
a) Deceased. The debtor is deceased and there have been insufficient funds within
the estate to meet the sum due.
b) Liquidation/Sequestration. The debtor/business has been liquidated/sequestrated
etc., and there is no prospect of recovery of funds.
c) No Trace/Gone Away. The debtor has been unable to be located and there is no
prospect of recovery of funds.
d) Small Balances/Uneconomical to pursue. There are insufficient funds or no
realisable assets that are available to meet the debt, and it is uneconomical to
continue to seek recovery of the sum due.
e) Recovery Exhausted. There are insufficient funds or no realisable assets that are
available to meet the debt and all appropriate recovery opportunities have been
exhausted. 
2.4 Table 1 categorises the value of debt recommended for write off by cause and value: 
Table 1
Cause Analysis Total
£
Number of
Accounts
Deceased 986.43 4
Liquidation/Sequestration etc. 8,412.23 7
Gone Away/No Trace 1,330.34 4
Small Balance/Uneconomic to pursue 858.04 17
Recovery Exhausted 69,517.33 39
Total 81,104.37 71 
Value Analysis Total (£) Number of
Accounts
<£500.00 6,462.99 40
>£500.00 74,641.38 31
Total 81,104.37 71
Page 236 of 292

Page 237

2.5 Whilst approval is sought to write-off the sums within our financial systems the Council
will continue to monitor the situation and if circumstances change then recovery of the
sums due will be reassessed. 
3. Measures of success 
3.1  Debt recovery will remain a priority for the service however where necessary adequate
provisions will be made for uncollectable debt to ensure there is no budgetary impact. 
4. Supporting documentation 
Not applicable 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 237 of 292

Page 238

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
There are no additional financial implications linked to this report for the current
financial year because a corresponding provision for expected credit losses has
been included in the previous year’s annual accounts.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 238 of 292

Page 239

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 239 of 292

Page 240

Page 240 of 292

Page 241

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    FW / LB Date 10/09/25 
General Debtors Write-Off 2025-26 – People Resources 
From  Fiona Whittaker, Chief Officer (People Resources)  
E-mail WhittakerF@northlan.gov.uk Telephone 01698 520629 
Executive Summary
The purpose of this report is to present to Committee a summary of outstanding debtor
accounts which are deemed uncollectible following all attempts at recovery or are not
economically viable to pursue for the People Resources service. 
The total value of these accounts is £47,470.80. In accordance with financial guidelines a
provision for expected credit losses has previously been established for the outstanding
accounts highlighted in the report so there are no additional financial implications for the
service. 
In addition, the report also considers the issue of duplicate overtime payments. As outlined
in paragraph 2.6 there were historically a number of weaknesses within the payroll system
that allowed these overpayments to materialise and given the difficulties current and former
employees had in properly understanding payslip information, the technical difficulties
associated with properly calculating recoveries (particularly in relation to tax implications)-
and the nature of much of the employment of affected staff (casual staff) then it is
recommended that these overpayments are not pursued. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledges the decision of the Chief Officer (People Resources) write-off debts
totalling £14,102.92 under delegated responsibility for debts under £500.00.
(2) Approves the write-off of £33,367.88 which includes debts greater than £500.00.
(3) Agrees that historical duplicate overtime payments totalling £154,775.01 are not
recovered for the reasons outlined in paragraph 2.10. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work Statutory / corporate / service requirement
Item 20
Page 241 of 292

Page 242

1. Background 
1.1 During 2024/25, the council issued invoices with an approximate value of £109 million. 
1.2 The Employee Service Centre previously processed employee transactions on behalf
of all services. They create debtors accounts for payments outstanding for employees
that are leavers. However, following a review during 2024/25 the responsibility for
raising these debts and pursuing their recovery was de-centralised back to services to
reflect that salary overpayments are largely as a result of delays in completing
employee leaver tasks. Therefore, this report largely relates to those debts previously
raised by the Employee Service Centre prior to the de-centralisation to services. 
1.3 In conjunction with the corporate debt recovery team, every effort is made to recover
any unpaid debt including reminder letters, the use of collection agents and legal action.   
1.4 However, despite these steps there are several debts that are deemed uncollectable
or are considered not economically viable to engage further collection activities and
costs. The annual process of assessing the likelihood of debt non recovery conforms
to accepted best accounting practice and is a reasonable assessment of expected
income. 
1.5 The Council will continue to seek collection of the outstanding balance if the
circumstances of the debtor alter, and recovery is deemed practical.   
2. Report 
2.1 Analysis of the outstanding balances has been conducted and £47,470.80 has been
identified as uncollectable. 
2.2 There are several reasons why the outstanding balances are being written off and these
are summarised below: - 
a. Recovery exhausted. There are insufficient funds or no realisable assets that
are available to meet the debt and all appropriate recovery opportunities have
been exhausted. 
b. Small Balances/Uneconomic to pursue. There are insufficient funds or no
realisable assets that are available to meet the debt, and it is uneconomic to
continue to seek recovery of the sum due.
c. No Trace / Gone Away. The debtor has been unable to be located and there is
no prospect of recovery of funds. 
2.3 The following table categorises the value of the debt recommended for write-off by
cause and value:  
Page 242 of 292

Page 243

Cause Analysis Total
£
Number of
Accounts
Recovery exhausted 15,261.67 5
Uneconomical to pursue 29,088.57 68
Gone away 3,120.56 5
Totals 47,470.80 78   
Value Analysis  
Under £500.00 14,102.92 55
Over £500.00 33,367.88  23
Totals 47,470.80 80 
2.4 The value of accounts identified for write-off represents a small proportion of the
accounts raised annually by the Employee Service Centre. 
2.5 The total accounts identified for write-off represents a small proportion of the accounts
raised annually by the Council (less than 1%). 
Duplicate Overtime Payments 
2.6  In April 2023, Internal Audit produced a report highlighting weaknesses in the Council’s
control environment designed to prevent duplicate overtime transactions being
authorised and paid. The report highlighted that the absence of effective controls meant
that there was a risk of error and the potential for fraud. The issue is largely as a result
of a weakness in the Council’s payroll system, iTrent, where the version of the system
used by the Council does not currently prevent a duplicate claim being made by an
employee or approved by a manager. 
2.7 Since the Internal Audit report the Employee Service Centre has introduced secondary
control measures that identify duplicate claims submitted in error and work is ongoing
with the payroll system provider to test and implement a new paid time module which
will be designed to prevent duplicate claims being made. 
2.8 This new paid time module would also resolve a significant issue employees currently
have in relation to making overtime or additional hours claims in that their payslips do
not specify the hours already claimed. As a result, it has been difficult for staff (and
largely casual staff) to be fully aware of the hours they have already claimed, been
approved by managers and paid which has resulted in inadvertent duplicate claims. 
2.9 The duplicate claims identified through work with Internal Audit relate to 2021, 2022
and 2023 and apply to 869 employees and total £154,775.01 representing an average
of £178 per employee. 
2.10 There are a number of reasons why the service recommends that these debts are not
pursued, and these are detailed as follows: 
• Limitations of the current iTrent module mean that payslips do not detail the dates,
hours worked and amount paid for each period of overtime / additional pay making
it difficult for staff to reconcile hours worked and paid. This is particularly difficult
for casual employees who may not work consistent shift patterns. Therefore, it is
acknowledged that the service is unable to confirm that the employee was aware
of a duplicate payment. In addition, affected employees with an overpayment are
Page 243 of 292

Page 244

likely to argue that their manager approved the payment, albeit in error so there is
a significant risk of challenge.
• As already described many of the staff are casual employees without consistent
and regular pay so the recovery process becomes more complicated i.e. we
wouldn’t want to be in a situation where a member of staff had a significant
deduction to their gross pay because of a wage deduction to support the recovery.
This would be likely to have an impact on availability of casual staff to undertake
duties in areas such as Active and Creative Communities. 
• Given the volume of employees involved and the need to consider the tax, Pension
and National Insurance implications for three tax years the small Payroll and
Pensions team would be required to carry out individual and complex calculations
for each employee. This would be both time consuming and costly given the
ongoing business-as-usual requirement to process regular payruns and provide
returns to HMRC and other bodies.
• Finally, a significant number of employees have now left the Council and prospects
of recovery are small, particularly with the relatively low value of payments to
individuals. Pursuing current employees when former employees are unlikely to be
pursued creates potential issues of fairness. 
2.11 The following table provides a summary of the overpayments including the service area 
these relate to, the value of overpayment and number of employees affected: 
Service Amount Outstanding
£
Service % Total Employees
Active and Creative
Communities
68,677.09 44.37 332
Chief Executives 1,381.48 0.89 9
FSS – Janitors 7,535.33 4.87 56
Health & Social Care 28,701.40 18.54 92
Infrastructure 2,804.45 1.81 17
Active Schools 4,234.81 2.74 31
Invigilators 29.7 0.02 1
Catering & Cleaning 23,760.23 15.35 242
Enterprise and Housing 12,098.9 7.82 37
Education and families 5,551.62 3.59 52
Total 154,775.01 100.00 869 
3. Measures of success 
3.1  Debt recovery will remain a priority for the service however where necessary adequate 
provisions will be made for uncollectable debt to ensure there is no budgetary impact. 
4. Supporting documentation 
Not applicable 
Fiona Whittaker
Chief Officer (People Resources) 
Page 244 of 292

Page 245

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
There are no additional financial implications for the current year because a
corresponding provision for expected credit losses has been included in previous
year’s accounts. 
Costs of duplicate payments have already been recognised in previous years so
there are no new financial implications associated with the recommendation not to
recovery payments. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
Page 245 of 292

Page 246

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 246 of 292

Page 247

North Lanarkshire Council
Report
Adult Care and Social Work Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    DF/PMcA/ES Date 02/09/25 
Sundry Debt Write Off 2025 
From  Diane Fraser, Head of Adult Social Work, Health & Social Care    
E-mail fraserdi@northlan.gov.uk  Telephone 01698 332001 
1. Background 
1.1 During 2024/25 the Council issued invoices with the approximate value of £108m. 
1.2 Within Adult Health & Social Care there are a number of chargeable services mainly in
the following areas: 
• Home Care Charges 
Executive Summary 
The purpose of this report is to present to Committee a summary of outstanding
debtor accounts which are deemed uncollectable following all attempts at recovery
or are considered uneconomically viable to continue pursuing. In accordance with
financial guidelines a bad debt provision has previously been established for the
outstanding accounts highlighted below.   
Recommendations 
It is recommended that Adult Care and Social Work Committee: 
(1) Notes the decision of the Chief Accountable Officer and the Head of
Financial Solutions under delegated responsibilities to write off £107,825.60 for debts
under £500. 
(2) Approve the write off of £55,409.02 which includes debts greater than £500. 
(3) Remit this report to Finance & Resources Committee. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work Statutory / corporate / service requirement
Item 21
Page 247 of 292

Page 248

• Nursing Home and Residential Home Accommodation Charges 
• Community Alarms 
• As well as chargeable services, invoices are raised to other local
authorities, health, and universities. 
1.3 The value of Adult Health & Social Care invoices raised during 2024/25 was £62m. This
figure includes invoices raised to other local authorities, health, and universities
£59m).    
1.4 In conjunction with the corporate debt recovery team, every effort is made to recover
any unpaid debt including reminder letters, the use of collection agents and legal action.
However, despite these steps there are a number of debts that are deemed
uncollectible or are considered not economically viable to engage further collection
activities and costs. This annual process of assessing the likelihood of debt non-
recovery conforms to accepted best accounting practice and is a realistic assessment
of expected income. 
1.5 The Council will continue to seek collection of the outstanding balance if the
circumstances of the debtor alter, and recovery is deemed practical. 
2. Report 
2.1 Analysis of the outstanding balances has been conducted and £163,234.62 
has been identified as uncollectable. 
2.2 There are a number of reasons why the outstanding balances are being written off and
these are summarised below: 
• Deceased.  The debtor is deceased and there have been insufficient
funds within the estate to meet the sum due. 
• Small Balances/Uneconomic to Pursue.  There are insufficient funds or
no realisable assets that are available to meet the debt and it is
uneconomic to continue to seek recovery of the sum due. 
• Gone Away. The debtor has moved address and cannot be located. 
• Recovery exhausted. Despite all efforts the service has now been
informed that these accounts will not be recovered. 
• Sequestration/Liquidation. 
2.3 The following tables categorise the value of debt recommended for write off by cause 
and value: 
Deceased   1059  55,244.10
Small Balances/Uneconomic to Pursue   112   1,573.48
Gone Away  333      4,413.24
Recovery Exhausted   6215 101,266.00
Sequestration/Liquidation 55          737.80      
Total  7774 163,234.62 
Value Analysis     
< £500  7764 107,825.60
> £500      10 55,409.02
Total  7774 163,234.62
Page 248 of 292

Page 249

2.4 The value of accounts identified for write off represents a very small proportion of the
accounts raised annually by Adult Health & Social Care.  This is reflective of a number
of activities aimed at improving collection rates, reducing debt arising and streamlining
the recovery process. 
3. Measures of success 
3.1 The Service continues to engage in a number of activities aimed at improving collection
rates, reducing debt arising and streaming the recovery process. 
3.2 These include: 
• Implementation of Debt Recovery Procedures 
• Performance Management Reports 
• Payment Arrangements 
• Payment by Direct Debit 
3.3 The Council will continue to seek collection of the outstanding balance if the
circumstances of the debtor alter, and recovery is deemed practical. 
4. Supporting documentation 
4.1 n/a 
Diane Fraser
Chief Officer (Adult Social Work Services) 
Page 249 of 292

Page 250

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 250 of 292

Page 251

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 251 of 292

Page 252

Page 252 of 292

Page 253

North Lanarkshire Council
Report
Education, Children and Families Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref: BS / SMcC Date 09/09/25 
Annual Bad Debt Write-Off Exercise 
From: Barry Smedley Chief Officer (Education North) 
E-mail: smedleybar@northlan.gov.uk Telephone: 01698 812269 
Executive Summary 
This report provides a summary of outstanding debtor accounts relating to previous financial
years which are deemed either to be uncollectible following all attempts at recovery or are not
economically viable to continue pursuing. In accordance with the Council’s Financial
Regulations, a provision for expected credit losses has previously been established for the
outstanding accounts. The total recommended for write-off for 2025/26 is £5,523.26 
Recommendations
It is recommended that the Education, Children and Families Committee: 
1) Acknowledge the decision of the Chief Officer (Education North) and Chief Officer
(Finance & Technology) under delegated responsibilities, to write-off a total of
£422.86 for outstanding debtors accounts under £500.
2) Approve the write-off of £5,100.40 for outstanding debtors accounts over £500.
3) Remit the content of this report to the Finance and Resources Committee. 
The Plan for North Lanarkshire
Priority Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 22
Page 253 of 292

Page 254

1. Background 
1.1. Under delegated responsibilities, North Lanarkshire Council’s approved Financial
Regulations require Chief Officers and the Chief Officer (Finance & Technology) to
approve the write-off of outstanding accounts of less than £500. In addition, the aligned
parent Committee is required to approve the write-off of outstanding accounts due to
the Council which are greater than £500. 
2. Report 
Chargeable Activities and Recovery Actions 
2.1.1. The Education & Families Service provide a range of chargeable activities such as, but
not limited to, cross boundary and/or inter-authority charges for service provision within
educational sectors; early years additional nursery hours and educational leadership
and training courses etc. 
2.1.2. For context, during the 2024/25 financial year, the Education & Families Service raised
585 invoices which had an aggregate total value of £2.348m.  In conjunction with the
Corporate Debt Recovery Team, every effort has been made by the Service to fully
recover outstanding accounts including reminder correspondence, use of collection
agents, and legal action. The value of the accounts identified for write-off in this report
represent a small proportion (less than 1%) of the total value of invoices raised each
year by the Service. 
2.1.3. Despite these proactive actions, there are several accounts that have been deemed
uncollectible and/or are considered not economically viable to engage in further
collection initiatives.  The annual process of assessing the likelihood of the non-
recovery of debt conforms to accepted accounting best practice and is a realistic
assessment of expected levels of future income recovery. 
Analysis of Write-Off 
2.1.4. A critical and in-depth analysis of the outstanding balances was conducted resulting in
a write-off total of £5,100.40 represented by £422.86 (accounts < £500) and £5,100.40
(accounts > £500) respectively. 
2.1.5. There are several reasons why the outstanding balances have been identified and
included in the annual write-off process. Individual balances typically fall into one of the
following categories: 
1) Recovery Exhausted
All available avenues have been pursued and there is no prospect of recovery of
funds. 
2) Uneconomic to Pursue
There are insufficient funds and/or no realisable assets that are available to meet
the debt and it is uneconomic to continue to seek the outstanding sum due. 
3) Sequestration/Liquidation
The debtor has entered a Trust Deed or the debtor has liquidated their assets. 
Page 254 of 292

Page 255

2.1.6. For additional information, the tables below provide an analysis of the proposed write-
off by value (Table 1) and cause (Table 2) in line with the categories described
previously. 
Table 1
VALUE £ No of Accounts
< £500 422.86 10
> £500 5,100.40 1
TOTAL 5,523.26 11 
Table 2
CAUSE £ No of Accounts
Recovery Exhausted 5,309.23 5
Uneconomic to Pursue 2.35 5
Sequestration/Liquidation 211.86 1
TOTAL 5,523.26 11 
2.1.7. There are no new financial implications linked to this report in relation to the current
financial year. The write off costs will be supported via the relevant financial provision
outlined in the Council’s Annual Accounts. 
3. Measures of success 
3.1. The Corporate Debt Recovery Team and the Service will continue to monitor and
review the volume and value of outstanding debts and seek recovery of all sums owed
to the Council. 
4. Supporting documentation 
4.1. Not Applicable. 
Barry Smedley
Chief Officer (Education North) 
Page 255 of 292

Page 256

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
As stated within the main body of the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐
Page 256 of 292

Page 257

If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The approach outlined in this report supports the Council’s actions in managing
financial sustainability and financial management risks.  Financial pressures and
risks are reviewed on a regular basis by the Service Management Team (SMT),
Business Management Team (BMT), Corporate Management Team (CMT) and
Committee. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these?
Page 257 of 292

Page 258

Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 258 of 292

Page 259

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  VR Date 27/08/25 
Enterprise & Communities General Debtors Write-Off 2025 
From Andrew McPherson, Depute Chief Executive 
E-mail   robertsv@northlan.gov.uk   
Executive Summary 
This report presents a summary of outstanding debtor accounts which are deemed
uncollectable following all attempts at recovery or are considered uneconomically viable to
continue pursuing. In accordance with financial guidelines a provision for expected credit
losses has previously been established for the outstanding accounts. 
The total recommended for write-off for 2024/25 is £366,973.35. In addition, it is
recommended that Cumbernauld Town and Shopping Centre debt with a value of
£126,638.74 and school meal debt with a value of £149,117.84 is written off. 
Recommendations 
It is recommended that the Housing Committee: 
(1) Acknowledges the decision of the Depute Chief Executive and Chief Officer (Finance
and Technology) to write-off debts under £500.00 totalling £210,676.65 under
delegated responsibility; 
(2) Approves the write-off of all items over £500.00 to the value of £156,296.70; 
(3) Approves the write-off of Cumbernauld Town and Shopping Centre debt of
£126,638.74 as set out in paragraphs 2.6 to 2.8; and 
(4) Approves the write-off of school meal debt of £149,117.84 for both 2023/24 and
2024/25 as set out in paragraph 2.9; and 
(5) Remits this report to the Finance and Resources Committee. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning 
Programme of Work  Statutory / corporate / service requirement
Item 23
Page 259 of 292

Page 260

1. Background 
1.1 During 2024/25 the Council issued invoices with an approximate value of £109.263m. 
1.2 Within Enterprise and Communities there are a number of chargeable services
including:
• Building cleaning
• Fleet
• Waste Collection and Disposal
• Burials
• Land rental charges
• Rechargeable property repairs, and
• Owner / occupier recharges 
1.3 The value of Enterprise and Communities invoices raised during the 2024/25 financial
year was £41.590m. 
1.4 Finance and Resource Committee, on 10 March 2022, approved the acquisition of The
Centre Cumbernauld’ (TCC) which concluded in June 2023. As at 8 July 2025, arrears
of £1.203m were due to North Lanarkshire Council for outstanding rent and service
charges raised to June 2025. This is attributable over the following aged debt profile: 
Period £
Pre-acquisition (Assigned)                245,886 
2023/24                365,196 
2024/25                458,805 
2025/26 Q1                133,385 
Total Outstanding Debt to June 2025            1,203,273 
1.5 In conjunction with corporate debt recovery team, every effort is made to recover any
unpaid debt including reminder letters, the use of collection agents and legal action.
However, despite these steps there are a number of debts that are deemed
uncollectible or are considered not economically viable to engage further collection
activities and costs. This annual process of assessing the likelihood of debt
nonrecovery conforms to accepted best accounting practice and is a reasonable
assessment of expected income. 
1.6 The Council continue to seek collection of the outstanding balance if the circumstances
of the debtor alter and recovery is deemed practical. 
2. Report 
2.1 An analysis of the outstanding balances held within the ASH debtors system has
identified a total of £366,973.35 to be uncollectable.   
2.2 There are a number of reasons why the outstanding balances are being written off and            
these are summarised below: 
a) Deceased. The debtor is deceased and there have been insufficient funds 
within the estate to meet the sum due. 
b) Liquidation/Sequestration. The debtor/business has been 
c) liquidated/sequestrated etc, and there is no prospect of recovery of funds.
d) No Trace/Gone Away. The debtor has been unable to be located and there is 
no prospect of recovery of funds.
Page 260 of 292

Page 261

e) Small Balances/Uneconomic to Pursue. There are insufficient funds or no  
realisable assets that are available to meet the debt, and it is uneconomic to
continue to seek recovery of the sum due.   
2.3 The following tables categorise the value of debt recommended for write-off by cause
and value                 
Cause Analysis Total (£) Number of
Accounts
Deceased 6,553.94 19
Liquidation 2,222.13 12
Gone Away /No Trace 12,573.99 36
Small Balances/Uneconomical to Pursue 149,880.13 1,021
Recovery Exhausted 195,743.16 513
Total 366,973.35 1,601   
Value Analysis Total (£) Number of
Accounts
< £500.00 210,676.65 1,522
> £500.00 156,296.70 79
Total 366,973.34 1,601 
2.4 The value of accounts identified for write-off represents a small proportion of the
accounts raised annually by Enterprise and Communities (approximately 0.91%). This
is reflective of a number of strategies adopted by the service including payment in
advance for services, where possible, withdrawal of services for non-paying debtors,
facilitating payment by direct debit and, where appropriate, payment arrangements. 
2.5 For comparison purposes, the total write-off approved for Enterprise and Communities    
over the last three years were £462,352.29 for 2022, £504,654.30 for 2023 and
£381,584.74 for 2024. 
Other Debt 
2.6 An analysis of the outstanding Cumbernauld Town and Shopping Centre balances has
been conducted and £126,638.74 has been identified as uncollectible. 
Debt Type £
Rental  92,345.24
Service Charge 34,293.50
Total 126,638.74 
2.7 There are a number of reasons why the outstanding balances are being written off and
these are summarised below: 
• Liquidation/Company Dissolved. The debtor/business has been
liquidated/dissolved etc., and there is no prospect of recovery of funds.
• Small Balances/Uneconomical to pursue. There are insufficient funds or no
realisable assets that are available to meet the debt, and it is uneconomical to
continue to seek recovery of the sum due. 
Page 261 of 292

Page 262

Reason for proposed write off £ No of tenants
Company Dissolved            70,965.09  5
Liquidation            46,134.83  1
Uneconomical to pursue              9,538.82  4
Total          126,638.74  10 
2.8 In addition, following advice and funding from the Scottish Government, an analysis of
school meal debt has identified a further £149,117.84 to be written off.  This covers
both 2023/24 and 2024/25 debt of £126,263.39 and £22,854.45 respectively.  The
Scottish Government directed funding for the full 2023/24 outstanding debt balance
with the 2024/25 balance fully provided for within the Expected Credit Loss calculation
during the 2024/25 year end close down 
3. Measures of success 
3.1  The Service continues to engage in a number of activities aimed at improving collection
rates, reducing debt arising and streamlining the recovery process. These include   
• Application of the approved Debtors Policy and associated debt recovery 
procedures           
• Performance management reports           
• Payment arrangements           
• Payment by direct Debit           
• Payment in advance, and 
• Cessation of service provision 
3.2   The Council will continue to seek collection of the outstanding balance if the
circumstances of the debtor alter and recovery is deemed practical.   
4. Supporting documentation 
Not applicable   
Andrew McPherson
Depute Chief Executive 
Page 262 of 292

Page 263

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
There are no additional financial implications linked to this report for the current
financial year because a corresponding provision for expected credit losses has
been included in the previous year’s annual accounts. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 263 of 292

Page 264

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 264 of 292

Page 265

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes ☒ No
Ref: NLC-CPT-24-038 Date: 10 September 2025 
Contract Award for Provision of Merchant Acquiring Services (2025-
2029) 
From  Greg Telfer, Chief Officer (Finance and Technology) 
E-mail McNameeR@northlan.gov.uk Telephone: Ryan McNamee, Finance
Manager 
Executive Summary 
In accordance with the Council’s General Contract Standing Orders (GCSOs), Committee is asked
to acknowledge the award of a contract for the Provision of Merchant Acquiring Services as detailed
within the report. 
In accordance with GCSO 21.3.2, the Agreement was awarded outwith Committee to expedite its
award due to the procurement timescales with the current contract expiring on 30 June 2025 and
the requirement to ensure on-going service delivery and the Council’s ability to accept payments for
local taxation and services. The Agreement was approved for award in accordance with GCSO
21.3.2 by the Depute Chief Executive on 25 June 2025 and the Agreement formally awarded on 30
June 2025.   
Recommendations 
It is recommended that the Finance and Resources Committee: 
(1) Acknowledges the award of the Agreement in accordance with GCSO 21.3.2 to Lloyds Bank
plc t/a Cardnet (the “Contractor”) at the maximum value of One Million, Three Hundred and
Forty-One Thousand Pounds Sterling (£1,341,000) exclusive of VAT for a period of 48 months
that commenced on 1 July 2025. 
The Plan for North Lanarkshire 
Priority Improve North Lanarkshire's resource base 
Ambition Statement (18) Ensure our digital transformation is responsive to all people's needs
and enable access to the services they need 
Programme of Work Statutory / corporate / service requirement 
Item 24
Page 265 of 292

Page 266

1. Background 
1.1 The contract is for the provision of merchant acquiring services to the Council, which
incorporates an electronic card merchant acquiring solution to process debit and credit card
transactions and manage the Council’s relationship with card schemes (ie Visa, Mastercard)
and card issuers (ie Lloyds, Barclays, RBS).  These services enable the Council to receive
card payments across its various services via e-commerce, online or telephone transactions. 
1.2 The requirements within the Agreement are currently under contract with Lloyds Cardnet.
This arrangement was due to expire on 30 June 2025 with the Agreement detailed within this
report due to supersede it. 
1.3 To enable appropriate development and execution of the procedure required to form the
Agreement, a panel of technical and procurement representatives (the “User Intelligence
Group (UIG)”) was formed. 
1.4  The UIG were responsible for developing the required internal contract strategy (the “Contract
Strategy“) for the Agreement. The Contract Strategy set out the parameters and approaches
the council would apply within the procurement, tendering, contracting and end of life stages
of the Agreement following appropriate analysis, research and investigation to ensure the
council achieves maximum benefit where possible. In accordance with GCSO 4.4, the
Contract Strategy for the Agreement was approved on 25 March 2025. 
2. Report 
2.1 The procurement procedure was undertaken as a “Direct Award”. A Direct Award is a
procurement procedure where an overarching framework agreement allows the council to
directly engage and contract with an appointed contractor that has already gone through a
full competitive procurement procedure in a more efficient manner as per the framework
agreements terms and conditions. 
2.2 Within the associated Contract Strategy for the Agreement, the overarching framework
agreement and determination of whether Best Value was achievable via the Direct Award
procurement, the recommended Contractor was identified, engaged and issued an invitation
to tender to formalise the Agreement. 
2.3 The tender received from the recommended Contractor underwent appropriate appraisal to
ensure it was complete / compliant with the council’s requirements and demonstrated Best
Value. 
2.4 Appendix 1 provides a summary of the procurement procedure undertaken including the key
considerations and outcomes. 
Financial / Budget Consideration 
2.5 The pre-tender wholelife estimate budget for the Agreement was £1,400,000. The costs
associated with delivery of the Agreement will be managed within existing revenue budgets
across the Council. 
2.6 The new contract provides estimated annual savings in comparison to the current contract
agreement of c.8%, based on current transaction volumes. However total costs are projected
to increase over the contract term as current trend of increasing transaction volumes due to
increased card payments and strategic direction towards increased cashless premises. 
Page 266 of 292

Page 267

Price Stability 
2.7 The framework provides a pricing schedule which includes fixed prices for merchant acquiring
transaction costs based on actual transaction level, along with market-wide scheme and
interchange fees. 
Community Benefits 
2.8 The procurement did not include a community benefit requirement as national framework
utilised.   
Fair Work First and Payment of the Living Wage 
2.9 Within their tender submission to obtain appointment to the overarching framework
agreement the recommended Contractor intimated that they would commit to the following
areas which incorporates requirements of the Scottish Governments “Fair Work First”
initiative. 
• Social Value requirements that supplier shall facilitate and promote social value,
complying with Corporate Social Responsibility. Social value priorities include fighting
climate change, equal opportunity, wellbeing, COVID-19 recovery and tackling economic
inequality. CSR elements include modern slavery, child labour & inhumane treatment;
income security and working hours requirements. 
2.10 Further information on the Living Wage status of the Contractor is detailed in Appendix 1. 
Contract Management 
2.11 Officers from the Treasury, Capital & Controls team within Finance and Technology will be
responsible for managing the Agreement which will be undertaken in accordance with the
contract and supplier management conditions applied within the Agreement. 
3. Measures of success 
The Agreement will deliver the following outcomes; 
3.1 Best Value will be demonstrated as outlined in Appendix 1; 
3.2  Conclusion of a procurement procedure that is compliant with procurement legislation and
internal procedures 
4. Supporting documents 
Appendix 1 Summary of Procurement Procedure 
Greg Telfer
Chief Officer (Finance and Technology)  
Page 267 of 292

Page 268

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Financial impacts are outlined within the report 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 268 of 292

Page 269

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
All risks are contained in a project risk register managed inline by standard council
processes.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from the
United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out? 
Yes ☐ No ☐  
Page 269 of 292

Page 270

Appendix 1 – Summary of Procurement Procedure 
Overview
Reference NLC-CPT-24-038
Title Provision of Merchant Acquiring Services (2025-2029)
Classification Services - Standard
Responsible Chief
Officer and Position Greg Telfer, Chief Officer (Finance and Technology) 
Competition
Governance by Value Overarching Framework Agreements terms and condition in accordance with the Councils General Contract
Standing Orders
Route to Market Direct Award from a Third-Party Framework Agreement
Framework Agreement
Title, Ref and Lot Info
Crown Commercial Services, RM6325 (Payment Acceptance 2), Lot 2 – Acquiring and Merchant Equipment
Services
Interest No. of Lot / Framework
Agreement Appointments  4 Date Invitation to Tender
Package Issued 03 April 2025
Tenders Received
Total No. of Tenders
Received 1 No. of Tenders From
SME’s 0
No. Tenders from NLC
Based Businesses 0 No. of Tenders from
Supported Businesses 0
Direct Award Basis Best Value Assessment of Framework Contractors in Accordance with the Framework Agreement
How Has “Best Value”
Been Demonstrated?
The scope of the merchant acquiring services are covered within the CCS framework, suppliers have already gone
through a full procurement process and terms and conditions are already in place. The suitable suppliers are
flexible to Council needs and provide a suitable service. The pricing model is a transaction charge for each card
payment type utilised plus scheme and interchange fees. This is common practice within the industry as evidenced
in the CCS framework. Prices will be fixed for the duration of the contract offering stability to the Council. 
Additional Comments
A desktop exercise was carried out reviewing framework information including pricing matrices and quality
responses from the framework approved suppliers with the Council utilising a Quality/Pricing weighting.  This
review identified Cardnet as providing the most economically advantageous tendered for this direct award as per
the process stated within the buyer guide for the CCS Payment Acceptance 2 framework agreement. 
Page 270 of 292

Page 271

Award Details
General Overview Total / Maximum Value £1,341,000 Contract Duration
(Months) 48
Contractor Registered
Name(s) Lloyds Bank plc trading as Cardnet
Contractor Overview Registered Local Authority
Area London Contractor(s) Size Large
Living Wage Paying the Living Wage Yes Living Wage Accredited Yes
Overview of
Community Benefits n/a
Additional Comments 
Impacts
Summary,
Public Sector
Equality Duty
and Fairer
Scotland Duty
☐ HR Policy
Impact ☐ Data Protection
Impact ☐ Environment /
Carbon Impact ☐ Risk Impact ☒
Children’s
Rights and
Wellbeing
Impact
☐
Financial
Impact ☒ Legal Impact ☐ Technology /
Digital Impact ☐ Comms impact ☐ Armed Forces
Covenant Duty ☐ 
Page 271 of 292

Page 272

Page 272 of 292

Page 273

North Lanarkshire Council
Report
Finance and Resource Committee 
Does this report require to be approved? ☐ Yes ☒ No
Ref: NLC-CPT-25-052 Date: 10/09/25 
Contract Award for the Provision of Utilities (Electricity, Gas, and Water) 
From  James McKinstry, Chief Officer (Assets and Procurement) 
E-mail MckinstryJ@northlan.gov.uk Telephone: Chris Sullivan, Strategic Asset
Manager – 07939 280579 
Executive Summary 
In accordance with the councils General Contract Standing Orders (GCSOs), the Committee is
asked to acknowledge the Councils continued participation in utility arrangements procured by
Scottish Procurement (a division of the Scottish Government) as detailed within this report below. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the Councils continued participation in the following framework agreements
procured by Scottish Procurement: 
(2) Supply of Electricity Framework Agreement (SP-21-052) awarded to EDF Energy Customers
Limited as a sole supplier from 01 April 2024 to a maximum of 31 March 2029. This framework
agreement was awarded at value of £3,500,000,000 with the councils anticipated spend over
the full five year being approximately £110,000,000 (£22,000,000 per annum); 
(3) Supply of Natural Gas Framework Agreement (SP-23-03) awarded to TotalEnergies Gas &
Power Limited.as a sole supplier from 01 April 2024 to a maximum of 31 March 2029. This
framework agreement was awarded at value of £1,200,000,000 with the councils anticipated
spend over the full four year being approximately £30,000,000 (£7,500,000 per annum); and 
(4) Water and Waste Water Billing Services Framework Agreement (SP-23-07) awarded to
Scottish Water Business Stream Limited as a sole supplier from 01 April 2024 to a maximum
of 31 March 2028. This framework agreement was awarded at value of £320,000,000 with the
councils anticipated spend over the full four year being approximately £10,000,000
(£2,500,000 per annum). 
The Plan for North Lanarkshire
Priority All priorities
Ambition Statement All ambition statements
Programme of Work One Service 
Item 25
Page 273 of 292

Page 274

1. Background 
1.1 The council, along with its Arm's Length External Organisations (ALEOs), needs to ensure
the supply of electricity, gas, and water management services to its operational properties
including offices, schools, leisure facilities, warehouses /depots etc. Utility provision is critical
within these operation properties to enable lighting, technology / communication, cooking,
heating etc. 
1.2 Scottish Procurement, a division of the Scottish Government, has historically been
responsible for developing and implementing procurement strategies for major national
commodities and contracts on behalf of the entire Scottish Public Sector, these include
strategic arrangements for utility provision with the following three framework agreements
currently in situ: 
Framework Agreement Title Start
Date
Initial
End Date
Max End
Date
Award
Value
Supply of Electricity (SP-21-052) 01/04/24 31/03/26 31/05/29 £3.5b
Supply of Natural Gas (SP-23-03) 01/04/25 31/03/27 31/03/30 £1.2b
Water and Waste Water Billing Services
(SP-23-07) 01/04/24 31/03/27 31/03/28 £320m 
1.3 Historically, the council has participated in previous generations of the above stated
framework agreements implemented by Scottish Procurement for nearly two decades.
Through the procurement and implementation of the current framework agreements by
Scottish Procurement, the council again has a direct route to market for its utility needs that
aligns with the rest of the Scottish Public Sector therefore continuing shared benefits and
economies of scale. 
1.4 Based on financial data available for the previous five years, the council spent on average
approximately £24 million annually on utilities, with around £15.5m on electricity, £7.5m on
gas, and £2.5m on water. 
1.5 However, due to the well-publicised increased wholesale costs in electricity and gas, cost for
this utility provision has increased significantly over the past two to three years. Accordingly,
it is anticipated that the council will spend approximately £150m combined on utility provision
across the three framework agreements (as detailed above) and as summarised below: 
• Supply of Electricity – approx. £110m over five years (£22m per annum);
• Supply of Natural Gas – approx. £30m over four years (£7.5m per annum);
• Water and Waste Water Billing Services – approx. £10m (£2.5m per annum). 
1.6 To enable appropriate development and execution of the procedures required to continue
participation in the three framework agreements, a panel of technical and procurement
representatives (the “User Intelligence Group (UIG)”) was formed. 
1.7 The UIG were responsible for developing the required internal contract strategy (the “Contract
Strategy“) for the Agreement. The Contract Strategy sets out the parameters and approaches
the council would apply within the procurement, tendering, contracting and end of life stages
of the Agreement following appropriate analysis, research and investigation to ensure the
council achieves maximum benefit where possible. In accordance with GCSO 4.4, the
Contract Strategy for the Agreement was approved on 18 July 2025. 
Page 274 of 292

Page 275

2. Report 
2.1 Each of the three frameworks were procured via an independent “Open Procedure”.
However, for the council to access and utilise each framework agreement, this can only be
done via the “Direct Award” procurement procedure as each framework agreement only has
a single supplier appointed. 
2.2 Appendix 1 provides a summary for each of the three framework agreements. 
Financial / Budget Consideration 
2.3 Electricity is closely monitored by both the contractor and the council. All council properties
fall under the single electricity Agreement, having one single supplier allows council to
monitor consumption and costs more effectively, via PDF and statement billing spreadsheet
method. 
2.4 Gas is also utilised in the same manner as above, all council properties fall under the single
gas Agreement and the council to monitor consumption and costs more effectively, also using
the PDF and statement billing method. 
2.5 Water is billed via the rateable value of a property in two separate charges, water usage and
the other wastewater, or drainage charges. All council properties also fall under the single
water Agreement and allows the council to effectively monitor charges and costs. 
2.6 Asset Management within Assets and Procurement are responsible for managing and
reviewing the council utilities approach, this includes payment of invoices etc. the
Agreements are billed to the council (as detailed below in section 2.7) via a statement billing
method resulting in a single invoice being received per utility per billing period. This results
in an efficiency to the council given the reduction in invoice transactions with costs for each
property recharged internally to the corresponding cost code. 
Price Stability 
2.7 Given the volatility of energy prices since the end of the COVID-19 lockdowns, the ongoing
war in Ukraine, and the surge in demand due to colder-than-expected winters, forecasting
energy prices has become increasingly challenging. Therefore, each framework agreement
incorporates its own processes and procedures to ensure that market rates remain
acceptable and align with the commercial approaches and strategies agreed as detailed
below: 
Framework Agreement
Title Brief Overview of Commercial Approach
Supply of Electricity
(SP-21-052)
Scottish Procurement purchase wholesale electricity on the
futures markets up to two-and-a-half years in advance. Their
flexible trading strategy smooths-out the peaks and troughs of
market fluctuations while avoiding payment of the ‘risk-
premium’ which would be applied to fixed rate tariffs. Flexible
purchasing is popular in the public sector as it improves budget
predictability while keeping costs down.
Supply of Natural Gas
(SP-23-03)
Scottish Procurement purchase wholesale gas on the futures
markets up to two-and-a-half years in advance. This flexible
trading strategy smooths-out the peaks and troughs of market
fluctuations while avoiding payment of the ‘risk-premium’
which would be applied to fixed rate tariffs. Flexible purchasing
is popular in the public sector as it improves budget
Page 275 of 292

Page 276

predictability, through a fixed cost of gas, which is reconciled
on an annual basis.
Water and Waste Water
Billing Services
(SP-23-07)
Scottish Water wholesale rates are subject to annual price
rises in line with the Scottish Water Wholesale Determination.
Rates of increase to apply for Wholesale Determination
periods are set to ensure sufficient funding to maintain/develop
infrastructure during that period. The next Wholesale
Determination period is due to last from 2024 - 2028 
Community Benefits 
2.8 The three identified framework agreements all include a community benefit requirement; this
approach is designed to deliver community benefits to Scotland as a whole however may
result in community benefits being delivered to North Lanarkshire if possible. An overview of
Community Benefits for each of the three framework agreements are detailed within
Appendix 1 of this report: 
Fair Work First and Payment of the Living Wage 
2.9 Further information on the Living Wage status of each contractor is detailed in Appendix 1. 
Contract Management 
2.10  Officers from the Asset Management team within Assets and Procurement will be responsible
for managing the Agreement which will be undertaken in accordance with the contract and
supplier management conditions applied within the Agreement. 
3. Measures of success 
3.1 The Agreement will deliver the following outcomes; 
3.2 Best Value will be demonstrated as outlined in Appendix 1; 
3.3 A collaborative approach to the procurement of the requirement, minimising the burden on
internal resource and leveraging the economies of scale; 
3.4 The procurement procedures undertaken by Scottish Procurement were compliant with the
procurement legislation and internal procedures; and 
3.5 The appointment of suppliers who have the experience and capability to deliver key utility
provision to the council 
4. Supporting documents 
4.1 Appendix 1 Summary of Framework Agreements 
James McKinstry, 
Chief Officer (Assets and Procurement) 
Page 276 of 292

Page 277

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The agreement is through a Scottish Procurements framework agreements which all public
c sector bides are opted into. The power of collective purchasing ensures the maximisation
of savings in what is a volatile market. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 277 of 292

Page 278

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
No Environment / Carbon Impacts are anticipated however the result of the agreement is
to provide utilities and it is the billing information that will provide the council with its
details for its building emissions. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
There is a risk to supply in terms of the UK’s potential to meet its demand. Risk increases
with the reliance on other countries such as Norway to meet our energy demand and the
depletion of the UK’s own gas reserves. Political unrest abroad can also impact such as
the Strait of Homuz (tensions between Iran and U.S.) 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services. 
Page 278 of 292

Page 279

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from the
United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out? 
Yes ☐ No ☐  
Page 279 of 292

Page 280

Appendix 1 – Summary of Procurement Procedure 
Overview
Reference NLC-CPT-25-052
Title Provision of Utilities (Electricity, Gas, and Water)
Classification Supplies
Responsible Chief
Officer and Position James McKinstry, Chief Officer (Assets and Procurement)
Direct Award Basis Single Contractor Framework Where Direct Award is the Only Available Call-off Procedure 
Framework Agreement Overview Scottish Procurement Supply of Electricity Framework Agreement (SP-21-052)
Has “Best Value” Been Demonstrated?
Utilising the Scottish Procurement Supply of Electricity Framework Agreement shall provide the following best
value considerations:
• Continued benefit of Scottish Procurement’s flexible purchasing of wholesale electricity;
• Provision of assistance to public sector organisations to work towards their net zero targets such as energy
efficiency services and options to sleeve Power Purchase Agreements;
• Options to purchase Renewable Energy Guarantees of Origin Certificates (REGOs); and
• Commitment to a range of Sustainability and Community Benefits
Award Details
General Overview Approximate Council
Spend: £110,000,000 Contract Duration
(Months) 60 (24 + 12 + 12 + 12)
Contractor Registered
Name(s) EDF Energy Customers Limited
Contractor Overview Registered Local Authority
Area London Contractor(s) Size Large
Living Wage Paying the Living Wage Yes Living Wage Accredited Yes
Overview of
Community Benefits
EDF made a commitment to a range of Community Benefits which includes the creation of a Social Value
Engagement Hub: Working to create Social Value Action Plans with customers to ensure core health , wellbeing
and energy priorities are being understood and addressed, this will be led by a Social Value Specialist that shall Page 280 of 292

Page 281

also include mentoring with charities focussed on combatting climate change or providing expert advice to
customers or suppliers via the Social Value Engagement Hub 
Framework Agreement Overview Scottish Procurement Supply of Natural Gas Framework Agreement (SP-23-03)
Has “Best Value” Been Demonstrated?
Utilising the Scottish Procurement Supply of Natural Gas Framework Agreement shall provide the following best
value considerations:
• Estimated savings of £7.9 million per annum;
• Improved customer service;
• Web portal upgrade; and;
• Commitment to a range of Sustainability and Community Benefits
Award Details
General Overview Approximate Council
Spend: £30,000,000 Contract Duration
(Months) 60 (24 + 12 + 12 + 12)
Contractor Registered
Name(s) Total Gas and Power Limited
Contractor Overview Registered Local Authority
Area Surrey Contractor(s) Size Large
Living Wage Paying the Living Wage Yes Living Wage Accredited No
Overview of
Community Benefits
TotalEnergies have committed to a Community Investment Fund of £10K per annum for charities and social and
environmental investment projects, two employees to be allocated two days per annum to volunteering in key
projects recommended by Scottish Procurement and Key Stakeholders; and commitment to work with local
secondary schools in Aberdeen and Shetland on STEM subjects 
Framework Agreement Overview Scottish Procurement Water and Waste Water Billing Services Framework Agreement (SP-23-07)
Has “Best Value” Been Demonstrated?
Utilising the Scottish Procurement Supply of Water and Waste Water Billing Services Framework Agreement shall
provide the following best value considerations:
• Annual cost avoidance savings for the duration of the contract;
• Automated meter reading (AMR) offering, including free AMR loggers on 30mm, 40mm and 50mm meters
or larger;
• Intelligent water management programme for reducing water usage; Page 281 of 292

Page 282

• Dedicated customer service team and account management; and
• commitment to a range of Sustainability and Community Benefits
Award Details
General Overview Approximate Council
Spend: £10,000,000 Contract Duration
(Months) 48 (36 + 12)
Contractor Registered
Name(s) Scottish Water Business Stream Limited
Contractor Overview Registered Local Authority
Area City of Edinburgh Contractor(s) Size Large
Living Wage Paying the Living Wage Yes Living Wage Accredited Yes
Overview of
Community Benefits
Business Stream have committed to a variety of community benefits including but not limited to: Developing the
Young Workforce, Career Ready Initiative, Apprenticeships, Foundation Apprenticeship Programme, Support for
Jobseekers (coaching programme), Green Skills Training, Development of Green Jobs to gain a SCQF Level 6
Qualification, and Schools Outreach 
Page 282 of 292

Page 283

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    JMcK/CPT Date 10/09/25 
Contracts awarded below Committee approval threshold 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail McKinstryJ@northlan.gov.uk  Telephone 07939 281102 
1. Background 
1.1 The Local Government (Scotland) Act 1973 section 81 requires local authorities to
“…make standing orders with respect to the making by them or on their behalf of
contracts for the supply of goods or materials or for the execution of works.”. 
1.2 The Council’s General Contract Standing Orders (“GCSOs”) set out the council’s
specific procurement procedures and responsibilities at all spend levels, and include
the reporting requirements of procurement activity, including contracts awards, to
committee for either approval or acknowledgement. 
2. Report 
2.1 In accordance with GCSO 21.10, this report summarises the contract awards since last
committee, specifically for the spend range: 
Executive Summary
In accordance with the Council’s General Contract Standing Orders (“GCSOs”), GCSO
21.10 requires a summary report be presented to members with details of contracts
awarded since last committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works.
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the contract awards made since last committee reporting cycle. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 26
Page 283 of 292

Page 284

• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
2.2 If you require further information regards the contract awards reported, please refer to
the lead service area / Chief Officer detailed in the appendix. 
3. Measures of success 
3.1 All requirements contracted contribute to either the council’s programme of work and/or
fulfil a statutory requirement. 
3.2 All contract awards secure best value for the council in accordance with their evaluation
criteria. 
3.3 All necessary diligence has been undertaken in the evaluation and appointment of
contractors. 
3.4 All contract awards are logged in the council’s contract register. 
4. Supporting documentation 
4.1 Appendix 1 – Summary of contracts awarded. 
James McKinstry
Chief Officer (Assets and Procurement) 
5. Impacts 
5.1 Impacts considered as part of the contract award procedures are recorded in the
individual contract award reports held by the lead service area.  
Page 284 of 292

Page 285

Appendix 1 – Summary of Contracts Awarded 
Contract Ref NLC-SLP-24-105
Title Continuation of ESRI GIS Contract
Classification Services
Chief Officer, Service Area Greg Telfer, Chief Officer (Finance and Technology)      
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Call-off following Direct Award using Third Party Framework
No. of Framework Contractors 29
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments This has been procured via Direct Award approach, considering the relevant information on
Framework Contractors technical and commercial proposals available through the Crown Commercial
Services - Vertical Applications Solutions Framework, Reference: RM6259, Lot 3: Housing,
Environmental and Planning Solutions.     
Award
Details
Value £91,905
Contract Duration 12 months
Contractor Name ESRI (UK) Limited 
Contractor Size Large
Contractor Location Buckinghamshire
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? No      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☐
HR Policy Impact ☐ Data Protection Impact ☐ Environment / Carbon
Impact ☐
Risk Impact ☐ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☒
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 285 of 292

Page 286

Contract Ref NLC-CPT-24-091
Title AP Export Interface Development & Support 2024-28 (ELCOM Integration Service)
Classification Services
Chief Officer, Service Area Pamela Humphries, Chief Officer (Place)      
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Call-off following Direct Award using Third Party Framework
No. of Framework Contractors Over 4,000 suppliers on G-Cloud 14 framework
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments This has been procured via Direct Award approach, considering the relevant information on
Framework Contractors technical and commercial proposals available through the Crown Commercial
Services Framework – G-Cloud 14, Reference: RM1557.14, Lot 3: Cloud Support.     
Award
Details
Value £89,102
Contract Duration 36 months with option to extend for 12 months (36 + 12)
Contractor Name Integrella Limited 
Contractor Size Small
Contractor Location London
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? No      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☐
HR Policy Impact ☐ Data Protection Impact ☐ Environment / Carbon
Impact ☐
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☒
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 286 of 292

Page 287

Contract Ref NLC-SLP-24-087
Title Enterprise Project - External Advisor Appointment (3rd gen)
Classification Services
Chief Officer, Service Area James McKinstry, Chief Officer (Assets and Procurement)      
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Call-off following Direct Award using Third Party Framework
No. of Framework Contractors 30
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments This has been procured via Direct Award approach, considering the relevant information on
Framework Contractors technical and commercial proposals available through the Crown Commercial
Services – Management Consultancy Framework Three (MCF3), Reference: RM6187, Lot 3: Complex
and Transformation.     
Award
Details
Value £450,000
Contract Duration 12 months with option to extend up to 24 months (12 + 12 + 12)
Contractor Name Turner & Townsend Cost Management Limited
Contractor Size Large
Contractor Location Leeds
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? No      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☐
HR Policy Impact ☐ Data Protection Impact ☐ Environment / Carbon
Impact ☐
Risk Impact ☐ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☒ Technology / Digital
Impact ☐
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 287 of 292

Page 288

Contract Ref NLC-CPT-24-050
Title Corporate Scanning
Classification Services
Chief Officer, Service Area Greg Telfer, Chief Officer (Finance and Technology)      
Competition Governance by Value Higher Threshold Regulated Procurement – The Public Contracts (Scotland) Regulations 2015
Procurement Route Open Procedure
No. of Expressions of interest 28
No. of Bids Received 11
Award Criteria Most Economically Advantageous Tender
Evaluation Scores – Successful 89.20%
Evaluation Scores – Unsuccessful 88.43% - 35.73%     
Award
Details
Value £450,000
Contract Duration 36 months
Contractor Name Storetec Services Ltd
Contractor Size Small
Contractor Location Hull
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? No      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☐
HR Policy Impact ☐ Data Protection Impact ☒ Environment / Carbon
Impact ☐
Risk Impact ☐ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☐
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer        
Page 288 of 292

Page 289

Contract Ref NLC-SLP-24-045
Title Aitkenhead Primary School; Rewire, Fire Stopping and Redecoration
Classification Works
Chief Officer, Service Area James McKinstry, Chief Officer (Assets and Procurement)      
Competition Governance by Value Non-Regulated; procured in accordance with the council’s General Contract Standing Orders
Procurement Route Quick Quote
No. of Expressions of interest 17
No. of Bids Received 4
Award Criteria Most Economically Advantageous Tender
Evaluation Scores – Successful 94.80%
Evaluation Scores – Unsuccessful 85.70% - 80.37%     
Award
Details
Value £663,653
Contract Duration 6 months
Contractor Name Emtec Property Services Ltd
Contractor Size Medium
Contractor Location East Ayrshire
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? Yes      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☐
HR Policy Impact ☐ Data Protection Impact ☐ Environment / Carbon
Impact ☒
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☐
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer        
Page 289 of 292

Page 290

Contract Ref NLC-SLP-25-016
Title Education Web Filtering Solution
Classification Supplies
Chief Officer, Service Area Greg Telfer, Chief Officer (Finance and Technology)      
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Call-off following Direct Award using Third Party Framework
No. of Framework Contractors 27
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments This has been procured via Direct Award approach, considering the relevant information on
Framework Contractors technical and commercial proposals available through the NHS Digital
Workplace Solutions Framework, Reference: SBS/19/AB/WAB/9411, Lot 1: Cloud Solutions.     
Award
Details
Value £493,710
Contract Duration 36 months
Contractor Name Softcat PLC 
Contractor Size Large
Contractor Location Buckinghamshire
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? Yes      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☐
HR Policy Impact ☐ Data Protection Impact ☒ Environment / Carbon
Impact ☐
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☒
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☒
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 290 of 292

Page 291

Contract Ref NLC-SLP-25-044
Title Netcall Telephony System Annual Support & Maintenance
Classification Supplies
Chief Officer, Service Area Greg Telfer, Chief Officer (Finance and Technology)      
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Call-off following Direct Award using Third Party Framework
No. of Framework Contractors 92
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments This has been procured via Direct Award approach, considering the relevant information on
Framework Contractors technical and commercial proposals available through the Crown Commercial
Services - Back Office Software 2 Framework, Reference: RM6285, Lot 2 Specialist Software Solutions.     
Award
Details
Value £119,000
Contract Duration 12 months
Contractor Name Netcall Technology Limited 
Contractor Size Medium
Contractor Location Bedfordshire
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? Yes      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☐
HR Policy Impact ☐ Data Protection Impact ☐ Environment / Carbon
Impact ☐
Risk Impact ☐ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☒
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 291 of 292

Page 292

Page 292 of 292