Agenda Document Pack - Finance and Resources Committee - 21/05/2025

North Lanarkshire Council · 21 May 2025
Back to Finance and Resources Committee — 21 May 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Clerk Name: Karen Swan
Clerk Telephone: 07919 730272
Clerk Email: committee@northlan.gov.uk
12 May 2025
Members of the
Finance and Resources Committee
Chief Executive’s Office
Rachel Blair
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk
Notice is given that a Meeting of the Finance and Resources Committee is to be held in
the Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on
Wednesday, 21 May 2025 at 10:00 AM which you are requested to attend.
The agenda of business is attached.
Rachel Blair
Chief Officer (Legal & Democratic)
Members :
A Duffy-Lawson, B McCulloch, A Ballinger, M Boyd, G Brennan, A Bustard, T Carragher, C
Costello, S Coyle, D Crichton, G Currie, K Duffy, J Hume, D Johnston, T Johnston, P Kelly,
J Keltie, K Larson, G Lennon, J Logue, H Loughran, A Masterton, P McDade, R
McKendrick, J McLaren, M McPake, J McPhilemy, L Nolan, P Patton, C Quigley, L Roarty,
G Robinson, W Shields, A Smith, A Stubbs, L Stubbs, R Sullivan, S Watson, C Williams, G
Woods.
Page 1 of 276

Page 2

Page 2 of 276

Page 3

Agenda
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000
2 Minute of Joint Consultative Committee for Local
Government Employees of 18 March 2025
Submit Minute of Meeting of the Joint Consultative
Committee for Local Government Employees of 18
March 2025
7 - 8
Operational
3 Employment Policy and Conditions Update
Submit report by Chief Officer (People Resources)
seeking approval of a number of updated Council
Policies.
9 - 114
4 Programme of Work Progress Report - Digital
North Lanarkshire, Performance Optimisation,
Enhanced Security Monitoring
Submit a joint report by Chief Officer (Legal and
Democratic) and Chief Officer (Finance and
Technology) providing an update on progress to
achieve the Council's ambition to (a) develop
organisational security model/standards/principles; (b)
identify vulnerable products & mitigating options; and
(c) develop and deploy compliance reporting along with
the continual improvements to the Council's cyber
security control set.
115 - 146
5 Microsoft Enterprise Agreement 2025-2028 –
Procurement Update
Submit report by Chief Officer (Finance and
Technology) providing an update on the procurement
in relation to the Microsoft Enterprise Agreement
contract.
147 - 154
6 Land Surplus to Operational Requirements at Ailsa
Road, Coatbridge
Submit report by Chief Officer (Assets and
Procurement) seeking approval to declare land at Ailsa
Road, Coatbridge surplus to Council requirements.
155 - 162
Page 3 of 276

Page 4

Performance
7 Strategic Performance Framework - Final
Performance Results for Business and Digital
Submit report by Chief Officer (Finance and
Technology) providing an update on the suite of
performance indicators used by Business and Digital.
163 - 176
Financial
8 Revenues and Benefits Update
Submit report by Chief Officer (Finance and
Technology) providing and update on the performance
within the Revenues and Benefits functions of Finance
as at 31 March 2025.
177 - 184
9 Revenue Monitoring Report Council Summary 1
April 2024 to 28 February 2025
Submit report by Chief Officer (Finance and
Technology) providing an update on the overall
financial position for the General Fund Account,
Housing Revenue Account and Adult Health and Social
Care, for the financial year to 31 March 2025; (2)
consolidating the budget monitoring position of all
Services, and (3) highlighting and explaining major
outturn variances as per the Council's approved
Financial Regulations.
185 - 196
10 Revenue Budget Monitoring Report - Chief
Executive's Service 1 April 2024 to 28 February
2025 (Period 12)
Submit report by Chief Officer (Finance and
Technology) providing a summary of the Chief
Executive's Service financial performance for the
period 1 April 2024 to 28 February 2025 (Period 12)
and (2) illustrating the provisional outturn as at 31
March 2025, with major outturn variances highlighted
and explained as per the Council's approved Financial
Regulations.
197 - 208
Page 4 of 276

Page 5

11 Capital Programme 2024-25 Monitoring Report
Submit report by Chief Officer (Finance and
Technology) providing an update on the 2024/25
resources and expenditure for the Council's Strategic
Capital Investment Programme; and (2) detailing the
2024/25 projected outturn position and the resultant
vacancies.
209 - 222
12 Chief Executive Service - Capital Monitoring Report
1 April 2024 to 28 February 2025 (Period 12)
Submit report by Chief Officer (Finance and
Technology) highlighting the financial performance and
projected outturn of 2024/25 Chief Executive capital
programme for the period ended 28 February 2025
(Period 12).
223 - 230
13 Treasury Management Monitoring Report for
Quarter ended 31 March 2025
Submit report by Chief Officer (Finance and
Technology) informing on the quarterly Treasury
Management Activity for the period from 1 January to
31 March 2025 and compliance with the mandatory
treasury and prudential indicators.
231 - 248
Contracts
14 Contract Award for Progress Licence and Software
Maintenance
Submit report by Chief Officer (Finance and
Technology) advising of the award of a contract for the
Progress Licence and Software Maintenance to
Progress Software Ltd.
249 - 258
15 Contract Extension for Provision of Merchant
Acquiring Services 2024-25
Submit report by Chief Officer (Finance and
Technology) advising of the award of contract
modification to the existing Provision of Merchant
Acquiring Services provided by Lloyds Bank.
259 - 264
16 Contract with Variations
Submit report by Chief Officer (Assets and
Procurement) advising of contracts completed between
1 April 2024 and 31 March 2025 where the expenditure
levels exceeded the contract award levels.
265 - 272
Page 5 of 276

Page 6

17 Contract Awards Below Committee Approval
Threshold
Submit report by Chief Officer (Assets and
Procurement) notifying of the Contracts Awarded since
the last meeting of the Committee with a value below
the financial threshold requiring approval.
273 - 276
Page 6 of 276

Page 7

JOINT  CONSULTATIVE  COMMITTEE  FOR  LOCAL  GOVERNMENT  EMPLOYEES  - 
18 MARCH 2025 
18 March 2025 at 2pm 
A Meeting of the JOINT  CONSULTATIVE  COMMITTEE  FOR  LOCAL  GOVERNMENT 
EMPLOYEES 
PRESENT 
Councillor Cairns, D. Johnston and Logue. 
J. Rooney (Unite), W. Shearer (Unison), V Thompson (Unite), J. Watson (Unison) and D Whelan (GMB). 
IN  ATTENDANCE 
Chief Officer (People Resources), Employment and Policy Manager, Occupational Safety and Wellbeing
Manager, Talent and Leadership Developemetn Manager and Democratic Co-Ordinator. 
APOLOGIES 
Councillors Boyd, Brannan-McVey, Carragher, M. Coyle, Currie, Duffy, Hume, Jarvie and Marie Quigley
(Unison). 
The Democratic Co-Ordinator advised that the meeting was inquorate, and the meeting was stood down. 
Item 2
Page 7 of 276

Page 8

Page 8 of 276

Page 9

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    FW/LC Date 21/05/25 
Employment Policy and Conditions Update 
From  Fiona Whittaker, Chief Officer (People Resources)  
E-mail whittakerf@northlan.gov.uk Telephone 07973 728628 
Executive Summary
This report provides a composite update on several positive People Resources policy
changes and developments, including improvements to the wording of our core conditions. 
These include:
• The introduction of our newly developed Disability Policy that is aimed at
supporting disabled employees throughout the lifespan of their
employment with the Council.  Also being introduced is our Neonatal Care
Leave Policy which will ensure that the Council is supporting employees
whose child is receiving neonatal care.
• A review of our Dignity at Work Policy, which has been updated with the
objective of providing a much more effective way of dealing with complaints
from employees. 
• An update of our Supporting Attendance Policy following the review of the
Managing Attendance Policy for Teachers, to establish a consistent, fair
and equitable approach to managing absence across all sectors of
employees within the Council. 
Finally, following a review of our core terms and conditions of employment, it has been
determined that some minor changes are required to the application of non-core hours and
higher duties. 
It should be noted that all policies provided, and all changes described within this report
have been agreed by the Trade Unions, following the normal consultation process. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Consider and approve the Disability Policy for implementation at the earliest point.
(2) Consider and approve the Neonatal Care Leave Policy for immediate
implementation.
(3) Consider and approve the revised Dignity at Work Policy. 
(4) Consider and approve the changes to the Supporting Attendance Policy (Single
Status employees only).
Item 3
Page 9 of 276

Page 10

1. Background 
1.1 Employers must do all they reasonably can to support disabled employees, workers,
and job applicants and to protect them from disability discrimination and while all of the
Council’s current employment policies take cognisance of our legal obligations under
the Equality Act 2010, navigating around them can be difficult.  Accordingly, the
decision was taken to implement a Disability Policy to help disabled employees and
applicants understand the supports available to them through our current policies by
providing them with one source of information. 
1.2 The Neonatal Care (Leave and Pay) Act came into effect on 6 April 2025 and is
intended to support parents of babies who are admitted into neonatal care within 28
days of birth for a continuous period of 7 days or longer. Employees are able to take
up to 12 weeks of leave in addition to their other family leave entitlements such as
maternity and paternity leave.  Neonatal Care Leave is a day one right, applicable to
all employees of the Council. 
1.3 A review of the Dignity at Work Policy has been undertaken as part of our ongoing
commitment to review policies to ensure that they remain fit for purpose and are
legislatively compliant.  The review has resulted in new sections being added to the
policy that allow for better management of complaints and encourages employees to
address minor issues informally where appropriate. 
1.4 Following a review of the Managing Attendance Policy for Teachers’ it was agreed that
the Supporting Attendance Policy (Single Status) would also be reviewed to ensure
that there was an equitable, consistent, and fair approach to managing attendance
throughout the Council.  Minor changes have been made to the Supporting Attendance
Policy for this purpose and are described later within the report. 
1.5 A review of the Council’s Core Conditions of Service has also resulted in changes to
the way that non-core hours and higher duties are applied.  An explanation of the
changes is detailed later in the report. 
2. Report 
Disability Policy 
2.1 The Council aims to create an inclusive and supportive working environment where all
employees with a disability or long-term health condition feel valued and can reach their
full potential.  The Disability Policy provides for a proactive approach to supporting
(5) Consider and approve the changes to the Core Conditions of Service as outlined
within this report.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (23) Build a workforce for the future capable of delivering on our
priorities and shared ambition
Programme of Work All Programmes of Work
Page 10 of 276

Page 11

employees and encouraging an accessible and inclusive environment in which they
can thrive. 
2.1.1 Whilst most areas of the policy are already known and practiced by managers
and employees across the Council, there are new areas that have been
introduced including the ‘Employee Adjustment Passport’. 
2.1.2 The ‘Employee Adjustment Passport’ will replace the reasonable adjustments
protocol by providing a much more effective way of assessing a disabled
employee’s needs throughout their employment. The Passport has been
designed to facilitate discussions that will ensure employees are empowered to
ask for reasonable adjustments that are suitable and applicable and are
reviewed on a regular basis.  The Passport will follow employees on their career
journey within the Council and will be reviewed and adapted as necessary to
ensure optimum opportunities in employment and to eradicate any form of
disadvantage. 
2.1.3 The Policy also covers external supports that can be provided to employees
including ‘Access to Work’ which is a government funded scheme that can help
individuals get or stay in work if they have a physical or mental health condition
or disability.   
2.1.4 Finally, the Policy provides a general overview of all aspects of employment
including recruitment, retention, and absence but other policies and procedures
will supplement as necessary including Special Leave and Supporting
Attendance. 
Neonatal Care Leave Policy 
2.2 Neonatal Care Leave is a new statutory right giving eligible employees up to 12 weeks
of paid leave if their baby requires neonatal care within the first 28 days after birth. The
leave is in addition to existing entitlements such as maternity, paternity, adoption, and
shared parental leave.   The Neonatal Care (Leave and Pay) Act 2023 aims to alleviate
the financial burden and work-related stress for parents with newborns in specialised
medical care.
2.2.1 Neonatal leave is available to all employees from the first day of their
employment, regardless of their length of service and applies to biological
parents, adoptive parents, intended parents through surrogacy, partners of the
mother and those responsible for the child’s upbringing. 
2.2.2 Employees can take up to 12 weeks of leave in full-week blocks, in addition to
their existing statutory leave rights but must be taken within 68 weeks of the
date of birth. 
2.2.3 Employees who have at least 26 weeks of continuous service by the 15th week
before the baby’s due date, will also be entitled to Neonatal Statutory Pay, the
payment for which mirrors other statutory entitlements such as maternity leave. 
2.2.4 The policy provides further details on the actual implementation of Neonatal
Care Leave and Pay and advises employees how they can apply for it.  The
policy also refers to a number of internal and external supports that might be of
benefit to employees who have a child in neonatal care. 
Page 11 of 276

Page 12

2.2.5 In conclusion, the policy aims to address our statutory obligations whilst
recognising and dealing with the difficult circumstances that employees face
when their baby requires neonatal care.  Due to employees’ statutory rights to
this leave if their baby is born on or after 6 April 2025, this policy is already in
operation within the Council and our Special Leave and Maternity Leave
policies have been updated to guide employees to the policy. 
Dignity at Work Policy 
2.3  The Council is committed to creating and maintaining a safe, welcoming, and inclusive
environment that nurtures a culture in which we treat one another with courtesy and
professionalism, even while robustly challenging each other’s views and opinions. The
Dignity at Work Policy aims to prevent bullying, harassment, discrimination, and
victimisation in the workplace and resolve incidents of such inappropriate behaviour if
they occur. 
2.3.1 A review of the Dignity at Work Policy was undertaken to ensure it remained fit
for purpose and provided a robust and effective framework for addressing both
informal and formal complaints of inappropriate behaviours. A number of key
additions and  changes have been made to the policy as outlined below. 
2.3.2 All individuals, regardless of position or status have a responsibility to promote
a healthy and positive working environment that is free from inappropriate
behaviours, as such roles and responsibilities have been updated to ensure
everyone understands their responsibilities in relation to Dignity at Work.   
2.3.3  A number of sources of support is available to individuals who are involved in a
Dignity at Work process, and these have been clearly detailed within the policy,
with a description as to what support each source can offer. A campaign was
also recently undertaken to new Dignity at Work Support Officers as the
numbers had significantly reduced. Extensive training has been provided, and
a peer-to-peer support network will also be provided for the support officers.             
2.3.4  To ensure that Dignity at Work complaints are addressed fairly and effectively
a number of changes have been made to both the informal and formal process
including the introduction of a self-reflection tool that individuals are encouraged
to use before submitting a complaint, an enhanced informal process that
strongly encourages individuals to take an informal approach to resolve
workplace issues, as this is shown to be the most effective way of resolving
conflict and a new preliminary review process for formal complaints to ensure
that the nature of the complaint falls within the scope of the Dignity at Work
Policy. 
2.3.5 Changes have also been made to which officers address formal complaints,
timescales for investigations, general terminology, and related
policies/legislation. The policy will be supported by a new toolkit which is
currently under development and training for managers will also be made
available. 
Supporting Attendance Policy 
2.4 Following the review of the Supporting Attendance Policy (Single Status), it was agreed
with the trade unions that if following a review of the Managing Attendance Policy for
Teachers and Associated Professionals, there were more favourable terms agreed,
Page 12 of 276

Page 13

then the Supporting Attendance Policy would be amended to ensure fairness, equity
and consistency of application. 
2.4.1 Accordingly, there are three main areas within the current Supporting
Attendance Policy that require to be adjusted to reflect the agreed terms within
the Managing Attendance for Teachers and Associated Professionals, these
being Absence Triggers, Stages for Long term absence and Discretion. 
2.4.2 Currently the triggers for a formal meeting within the Supporting Attendance
Policy are 3 absences in a 12-month rolling period, 8 days cumulative in a 12-
month rolling period or 2 weeks continuous.  The proposal is to change the first
trigger to 3 absences in a 6-month rolling period. 
2.4.3 The timescales for holding stage meetings during long-term absences are
clearly defined within both policies, however following the agreed Managing
Attendance for Teachers and Associated Professionals, these timescales will
be expanded for single status employees as detailed below: 
2.4.4  In the current Supporting Attendance Policy, discretion to remain on a level can
only be considered at Stage 2 onwards and can only be applied once during
the employee’s journey through the formal process.  Discretion will now be
considered at any stage and will normally only be applied once, however there
is recognition that it may be appropriate in certain circumstances to apply more
than once. 
2.4.5 It is not anticipated that the above changes to the Supporting Attendance Policy
will have any detrimental impact on the current management of absence but will
ensure that all Council employee’s absences are being managed and
addressed fairly.   
2.4.6 The alignment of these policies will also hopefully assist in reducing our
absence levels across the Council and whilst the National Benchmarking
Overview Report for 23/24 reports that nationally ‘absence levels for all staff,
excluding teachers, have continued a long-term upward trend, reaching an all-
time high of 13.9 days in 2023/24, which is a 4.6% increase from 2022/23’, the
Council’s year end absence figure for this year is anticipated to be well below
this figure at around 10.55 FTE days lost per employee. 
Core Conditions of Service 
2.5 Following a review of the core conditions of service and their application, it has been
determined that two areas require to be updated to better reflect the flexibility that is
required within our services and to assist in the upskilling and provision of development
opportunities for our employees. 
Current
• Stage 1 - on reaching 8 weeks
of a continuous absence.
• Stage 2 - on reaching 13 weeks
of a continuous absence. 
• Stage 3 – Capability Meeting -
on reaching between 24 and 36
weeks of a continuous absence 
Proposed
• Stage 1 - on reaching 8 to 12
weeks of a continuous absence.   
• Stage 2 - on reaching 17 to 25
weeks of a continuous absence.
• Stage 3 – Capability Meeting -
on reaching between 36 to 52
weeks of a continuous absence 
Page 13 of 276

Page 14

2.5.1  At the current time, employees who work outwith the core hours of 7 am to 8
pm Monday to Friday, have to work 5 hours or more before they receive a 15%
enhancement on their hourly rate for all hours worked outwith the core hours
which prevents some employees working outwith core hours in our frontline
services.   In addition, due to nature of this payment, manual calculations have
to be undertaken by the Employee Service Centre which is often time
consuming and administratively onerous. To encourage more flexibility and
reduce unnecessary administration, it is proposed to remove the 5 hours criteria
and all hours worked outwith the core hours will attract a 15% enhancement on
the hourly rate.    This will not apply to those who work exclusively on a Saturday
or Sunday.  The proposal is estimated to cost the Council less than £500k per
annum to implement. 
2.5.2  Services often ask employees to act up to a vacant post or to undertake higher
duties and at the current time the core conditions advise that employees in
receipt of a salary above NLC07 have to undertake higher duties or acting up
for four weeks before they can be paid, whereas those below NLC07 are paid
from the commencement of the arrangement.  To address this anomaly, it is
proposed to remove this differential and all employees who are acting up or
undertaking higher duties will receive the appropriate payment from the onset.     
2.5.3 In addition to the above and to ensure that managers and employees
understand when it is appropriate to use acting up or higher duties
arrangements, the attached guidance has been developed setting out clear
guidelines for use and application.   
Next Steps 
2.6 Following approval, the necessary steps will be taken to inform the workforce of the
policies and changes as detailed within this report. 
3. Measures of success 
3.1  North Lanarkshire Council is seen as an inclusive, forward-thinking organisation that
understands the importance of ensuring everyone has the ability to reach their full
potential and have access to the appropriate support and community networks to
facilitate this. 
3.2 The Council remains an employer of choice, demonstrating empathy towards
employees who find themselves in difficult personal circumstances by offering them a
level of support and reassurance at some of the toughest times of their life. 
3.3 Employees are confident in addressing Dignity at Work complaints with each other or
their managers, the number of complaints and the timescales for addressing such
matters are reduced. 
3.4 Absences are managed fairly, equitably, and consistently across all sectors of the
Council ensuring that employees are both supported and provided with the help they
need to expedite an early return to work or prevent a protracted period of absence. 
3.5 As an organisation, our terms and conditions allow for the flexibility that is necessary
to provide effective and efficient services whilst ensuring our employees are afforded
opportunities to grow and develop to support both their personal and organisational
ambitions.   
Page 14 of 276

Page 15

4. Supporting documentation 
4.1  Appendix 1 - Disability Policy
4.2 Appendix 2 - Neonatal Care Leave Policy
4.3 Appendix 3 - Dignity at Work Policy
4.4 Appendix 4 - Acting up and Higher Duties Guidance 
Fiona Whittaker
Chief Officer (People Resources) 
Page 15 of 276

Page 16

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
There will be some costs associated with changes to non-core hours wording
however these have been fully discussed and agreed with colleagues in Finance
and Technology and will be provided for within the MTFP. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
All new policies have been agreed by the trade unions as have amendments to
existing policies.  The new policies will add to our existing suite of supportive
policies for employees whilst ensuring compliance with statutory and equality
legislation.  Changes to core conditions are minimal and will have little impact on
employees but will provide managers with more flexibility around employment. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Page 16 of 276

Page 17

5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 17 of 276

Page 18

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 18 of 276

Page 19

Appendix 1 
This is a controlled document. The digital PDF file published on InsideNL is the
control copy. 
 Always access this document from the control location.
 When you open this document, your device may automatically download it.
If it does, you should still open it from the control location in future.
 You can print this document, but a printed copy isn’t the control copy.
 Don’t save any digital copies of this document anywhere. This includes your
device, USB flash drives, network drives, OneDrive, Teams/SharePoint, or
any other digital storage device, system, service, or location. 
Disability Policy
Version 1.0, 14/03/2025  
Page 19 of 276

Page 20

Disability Policy v1.0
Document control
Title Disability Policy
Governance group Policy and Strategy Committee
Owner Fiona Whittaker, Chief Officer People
Resources 
Contact whittakerf@northlan.gov.uk 
Author Lindsay Millar, Employment and Policy Officer Contact millarl@northlan.gov.uk 
Revision history
Version Originator Review start date Revision description and record of change
1 Lindsay Millar  March 2025 First Version         
Document approvals
Version Governance group Date approved Date approval to be
requested 
(if document still in draft)
1 Finance and Resources    May 2025         
Consultation record (for most recent update)
Consultation status Stakeholders consulted
Stakeholders
consulted and dates
People Resources Team
Single Status Trade Unions
Teaching Trade Unions 
Strategic alignment
Plan for North Lanarkshire
Improving the Council’s Resource Base – A Workforce Strategy that is built around the needs of the
Council (as a single resource base) to deliver the priority outcomes, ensuring future workforce
requirements, new skills and innovative approaches, and succession planning are recognised. 
Next review date
Review Date This policy will be reviewed on a regular basis to ensure that it remains fit for
purpose and compliant with all relevant employment legislation.  
Page 20 of 276

Page 21

Disability Policy v1.0
Contents
1. Introduction ...................................................................................................................................... 1
2. Scope.................................................................................................................................................. 1
3. Legislation and Associated Policies ............................................................................................... 1
4. Aims ................................................................................................................................................... 1
5. Supporting disabled employees .................................................................................................... 2
6. Roles and responsibilities ............................................................................................................... 3
6.1. Our Responsibilities ............................................................................................................... 3
6.2. Employee Responsibilities .................................................................................................... 3
6.3. Managers Responsibilities .................................................................................................... 4
6.4. Employment and Policy Team Responsibilities ................................................................. 4
7. Employee Adjustment Passport ............................................... Error! Bookmark not defined.
8. Recruitment and Selection ............................................................................................................. 5
8.1. Guaranteed Interview Scheme ............................................................................................ 6
8.2. Discussing Disability with Individuals ................................................................................. 6
9. New employees ................................................................................................................................ 6
10. Existing members of staff ............................................................................................................... 7
11. Retention ........................................................................................................................................... 8
12. Absence from Work ......................................................................................................................... 8
13. Working environment ..................................................................................................................... 8
14. Access to Work ................................................................................................................................. 9
15. Informing of a Disability .................................................................................................................. 9
16. Support Mechanisms..................................................................................................................... 10
17. How to make a complaint ............................................................................................................. 10
18. Review of policy .............................................................................................................................. 11
Appendix 1  Disability Definitions
Appendix 2 Employee Adjustment Passport
Appendix 3 Reasonable Adjustment Process (including Assisted Technology)
Appendix 4 Four Stages of Discussing a Disability with Disabled Employees
Appendix 5 List of Supports 
A note about plain English
This document follows plain English guidance, in line with our corporate commitment to clear communications. In particular, it uses the
following terms.
 ‘We’, ‘us’ and ‘our’ when referring to the Council (as an organisation), our collective responsibilities (as authorised users of Council IT assets),
and when discussing specific activities.
 ‘You’ and ‘your’ when referring to the individual responsibilities and actions of authorised users of Council IT assets.
Page 21 of 276

Page 22

Disability Policy v1.0   1
1. Introduction 
The Council is committed to developing, maintaining and supporting a culture in which
equality and diversity is valued and disabled employees and applicants are treated fairly
as defined in the Equality Act 2010. 
The Council is a Disability Confident Leader.  Membership of the Disability Confident
Scheme is administered by the Department for Work and Pensions and recognises our
commitment to successfully employing and retaining disabled people and those with
health conditions. 
The Equality Act 2010 provides protection against discrimination, harassment and
victimisation on the grounds of disability.  The Equality Act 2010 defines a disability as
“a physical or mental impairment which has a substantial and long-term adverse effect
on your ability to carry out normal day-to-day activities.”   
The legal definition and further explanation of disability under the Equality Act 2010 is
provided at Appendix 1. 
2. Scope 
This policy applies to all Council employees and workers and job applicants to the
Council.  The Equality Act 2010 states that employers must also make reasonable
adjustments for contractors and self-employed people hired to personally do the work. 
3. Legislation and Associated Policies 
The Equality Act 2010 is the principal piece of legislation that supports this policy. 
This Policy and Procedure should also be read and applied in conjunction with other
Council policies/frameworks such as Supporting Attendance, Managing Absence
(Teachers), Dignity at Work, Grievance, Smarter Working, Special Leave, Mental Health
& Wellbeing, Equality and Diversity in Employment and Workforce Change.   
4. Aims 
The purpose of this policy is to ensure that the Council recruits and retains talent, skills
and experience and ensures disabled employees, can fulfil their employment potential. 
The Council aims to provide all future and current employees with equality in access to
the full range of recruitment, career development, promotion, training and other
employment opportunities. 
Page 22 of 276

Page 23

Disability Policy v1.0   2
The Council will ensure that there is no unfair discrimination on grounds of disability
and that access to employment and promotion in the Council is based on merit. 
The Council has adopted the "social model of disability" to inform our workforce to
promote equality of opportunity and to tackle discrimination against disabled people.
This describes disability not as a medical issue, but one where disabled people face
daily barriers in society such as attitudinal, environmental, institutional, information
and communication barriers. 
5. Supporting disabled employees 
Managers should do all that they can to support disabled employees and should break
down any stigma associated with discussing disability. 
Talk      Inform                                           
Support       Manage 
Managers Employees
Talk Managers will have confidential
discussions with their employees
about their needs
Employees will have open and
honest discussions with their
manager about their needs
Inform Managers will ensure that 
employees are aware of all the
supports available to them
Employees will provide relevant
information to their manager to
mutually agree the best supports to
remove or reduce any disadvantage
at work
Manage Managers will ensure that the 
correct supports are in place for
their employees and will review the
effectiveness 
Employees will advise their 
manager of any changes to their
condition/circumstances in order to
review the effectiveness of
adjustments.
Support Managers should help create a
culture where disabled employees
are valued 
Employees should be provided with
support if needed to help aid
discussion about barriers in
employment for disabled people. 
Page 23 of 276

Page 24

Disability Policy v1.0   3
6. Roles and responsibilities 
6.1. Our Responsibilities 
Overall responsibility for equality and diversity, and the full implementation and
monitoring of this policy rests with the Council. 
Chief Officers have a specific responsibility for implementing and monitoring equal
opportunities within their own service. 
The Chief Officer (People Resources) will, in addition, have responsibility for: 
a) ensuring the Disability Policy is implemented and monitored
b) co-ordinating, controlling and standardising policies, procedures and practices 
c) the provision of necessary training and guidance for employees and elected    
members to achieve equality of opportunity in all areas of employment
throughout the Council 
We make the following commitments to ensure effectiveness of the policy: 
a) to consult, where appropriate, with relevant trade unions and other appropriate
employee representative groups on the content, implementation and
monitoring of the policy
b) to ensure the policy is made known to all employees and job applicants and that
all employees are made aware of their responsibilities under the policy
c) to provide training and guidance for employees as appropriate 
d) to provide training and guidance for managers as appropriate
e) to examine and regularly review employment procedures and practices with a
view to promoting equality of opportunity and eliminating discrimination
f) to regularly monitor policy effectiveness and identify possible areas for action 
6.2. Employee Responsibilities 
Although the primary responsibility for ensuring equality of opportunity in employment
rests with the Council as an employer, the policy can only be truly effective if it has the
commitment of all employees. 
Individual employees at all levels have responsibility under both legislation and the
policy for assisting in the promotion of equality and the prevention of discrimination.
In particular, individual employees should: 
a) inform their line manager about their disability in order for the necessary
support to be put in place
Page 24 of 276

Page 25

Disability Policy v1.0   4
b) be responsible for promoting equality, valuing diversity and contributing to an
inclusive culture
c) have open conversations with their manager about their disability and fully
engage with the process including completing the Employee Adjustment
Passport in conjunction with their manager, attending appointments with
occupational health and considering other interventions/support measures to
help 
d) take personal responsibility and appropriate measures to manage their own
health and wellbeing, including seeking medical advice, and bring any health or
work-related issues to the attention of their manager at the earliest opportunity
e) apply to Access to Work for financial assistance with the costs of equipment or
additional support where this is required 
6.3. Managers Responsibilities 
All managers have responsibility to assist in the promotion of equality and the
prevention of discrimination and have responsibility for ensuring the full
implementation of the policy. 
In particular managers have the following responsibilities: 
a) handle personal information sensitively and with discretion
b) create opportunities for employees to declare a disability and encourage them
to do so
c) receive concerns from employees in the event they feel they are not being
treated fairly and discuss with the Employment and Policy Team 
d) consult with employees and the Employment and Policy Team if required to
decide what adjustments can reasonably be made, ensuring these are put in
place and completed on the Employee Adjustment Passport 
e) understand their responsibilities in line with this policy
f) treat all employees equally and do not discriminate against disabled employees  
g) be responsible for promoting equality, valuing diversity and contributing to an
inclusive culture 
h) involve occupational health as appropriate 
6.4. Employment and Policy Team Responsibilities 
The Employment and Policy Team have the following responsibilities 
a) facilitate dialogue between the line manager and disabled employees, if required
b) advise the line manager about the legal obligations as an employer
c) advise the line manager about sources of specialist advice
d) advise the line manager about the process of agreeing changes to a current or
future employee’s role as a reasonable adjustment  Page 25 of 276

Page 26

Disability Policy v1.0   5 
7. Employee Adjustment Passport 
The Employee Adjustment Passport is a document that facilitates discussion between
managers and employees to agree reasonable adjustments. This has replaced the
Reasonable Adjustment Protocol. Reasonable adjustments are supports that enable
individuals to enter, and remain, in employment. 
New employees to the Council who have a disability may be asked to support the
completion of the passport prior to commencing employment to ensure that all
reasonable adjustments are in place for the start of their employment. 
The Employee Adjustment Passport is mutually agreed between the employee and the
manager.   The Employee Adjustment Passport travels with an employee throughout
the employment cycle and should be reviewed when there are any changes to their
current role or if an employee transfers to another role. When an Employee Adjustment
Passport is updated, the manager must record the details on ITrent, and the updated
version placed in the employee’s personnel file. 
Employees are responsible for ensuring that the agreements remain relevant, given
that symptoms of disabilities can change/evolve over time and the effectiveness of
adjustments may change. Employees who have existing adjustments in place that have
not been formalised using the protocol, should contact their line manager and
complete the Employee Adjustment Passport.  Any changes to an Employee Adjustment
Passport must be agreed between the employee and line manager. 
8. Recruitment and Selection 
As part of the Disability Confident Leader status the Council will continually take action
to improve how we recruit, retain and develop disabled employees.  The Council
encourages applications from disabled candidates and will make reasonable
adjustments where possible at all stages of the recruitment process. 
The Council has policies in place including, the Workforce Change Policy, and the
Equality and Diversity in Employment Policy which detail the supports available when
recruiting disabled people.  The Council will continue to review and develop recruitment
and promotion procedures in accordance with legislation.   
All advertisements, job descriptions, person specifications etc. will comply with the
terms of this policy and will be worded and displayed in ways designed to encourage
applications from all suitable potential applicants. To this end, clear job descriptions
and objective person specifications (using only necessary and relevant criteria to do the
job) will be used. 
Page 26 of 276

Page 27

Disability Policy v1.0   6 
The Council will ensure that it is as inclusive as possible by ensuring that adverts for
posts detail the benefits that are available including Hybrid and Flexible Working.
Selection will be based solely on the extent to which candidates possess the essential
criteria for the post.  We will also ensure that employees and elected members involved
in the recruitment process are given adequate and appropriate training. Candidates will
only be assessed against relevant, clearly identified requirements for the job. 
As part of the recruitment process the Council will make reasonable adjustments as
necessary for applicants applying for posts within the Council.   
8.1. Guaranteed Interview Scheme 
The Council operates a guaranteed interview scheme for disabled applicants.  This is a
commitment to interview disabled applicants when they meet the essential criteria for
the post which they have applied.  Applicants will identify if they consider themselves
to be disabled on their application form to allow managers to identify them.  If the
applicant does not demonstrate that they meet the essential criteria they will not be
guaranteed an interview.   
8.2.  Discussing Disability with Individuals 
It is not acceptable to ask any job applicant about their health or any disability, as a
matter of course, until the person has been selected as the successful candidate. 
However, recruiting managers can ask questions to find out if any applicant needs
reasonable adjustments for the recruitment process.  Reasonable adjustments may
include working interviews, having a support worker attend the interview, extend time
given for the interview, or move to an accessible location.  Individual applicants should
discuss their requirements with the recruiting manager. 
9. New employees 
All new employees are required to complete a function-based health questionnaire that
is returned to the recruiting manager and depending on the information contained
within the questionnaire, a pre-employment appointment may be arranged with our
Occupational Health Service, and/or the employee may be required to attend a meeting
with the prospective manager along with a member of the Employment & Policy Team. 
If the person is required to attend Occupational Health, they will send a report to the
recruiting manager following the assessment, confirming whether the appointee is fit
to undertake the role they have been offered and outline any adjustments that are
required to allow them to confidently and safely carry out their duties. 
Page 27 of 276

Page 28

Disability Policy v1.0   7
The Council will consider all reasonable adjustments to facilitate employment and will
discuss this with the successful candidate.  Managers should make these adjustments
in a timely manner to allow the appointee to start work as soon as possible and should
support the new employee whilst waiting for the adjustments to be put in place. The
manager should complete the Employee Adjustment Passport, and this will be recorded
on ITrent.  The Employee Adjustment Passport should follow the employee throughout
their career with the Council and should be reviewed and updated on a regular basis.   
Assistance, such as providing specialised equipment, can be provided from the Access
to Work scheme if appropriate, further information on Access to Work is detailed later
in the policy. 
More information on the Employee Adjustment Passport and the process for
implementing reasonable adjustments is available in Appendix 2 and 3. 
10. Existing members of staff 
If a current employee becomes disabled or experiences a change to their pre-existing
disability the Council will consider and implement reasonable adjustments to enable
the employee to continue in their role.  This may impact on attendance levels and in
these circumstances the relevant sickness absence policies should be followed. 
When an employee becomes disabled, the first step should be to meet with the
employee and discuss how this impacts on their ability to carry out their role and what
supports they feel are required.  An occupational health referral will be made for
assessment and advice on what adjustments are required.  Following this, a meeting
will take place to discuss the information and complete the Employee Adjustment
Passport which will formally record what has been agreed and put in place.  This will be
recorded on ITrent.  The Employee Adjustment Passport should follow the employee
throughout their career with the Council and should be reviewed and updated on a
regular basis.       
In some cases, it may be that an employee is no longer able to carry out their role and
a suitable alternative role should be sought.  This may be recommended by
occupational health, and a manager would discuss this with the employee and consider
what options are available.  Employees would be supported through the process set
out in the Workforce Change Policy under redeployment and the manager and
employee would be supported by the Employment and Policy Team. 
The Council operates a Smarter Working Policy and Special Leave Policy which should
be utilised when an employee is experiencing symptoms.  For example, flexible start
and finish times. 
Page 28 of 276

Page 29

Disability Policy v1.0   8
Further information is available in Appendix 4 which details the four stages to the
process when dealing with disabled employees. 
11. Retention 
The Council undertakes, so far as is reasonably practicable, to ensure that employees
who are disabled or become disabled are able to remain in their role, before a
consideration of other alternatives. 
For employees that become disabled during the course of their employment,
professional advice may be sought from a range of sources and may include the
provision of equipment and adaptions. 
The Council has a Disability Equality Working Group which looks at actions required for
the Council in order to support disabled employees, to ensure we are getting the right
people for our business and making sure we are keeping and developing our people.   
The Council is also introducing a Mentoring Framework to provide opportunities to
support employees.  Mentoring has been proven to be a powerful development tool
that enables knowledge transfer; employee engagement; retention and talent
management, all of which are particularly important for the Council given its aging staff
profile and requirement to strengthen our career pathways. The introduction of a
formal corporate mentoring programme will ensure that mentoring is promoted across
all Council services, whilst ensuring quality, consistency and effectiveness in mentoring
delivery. 
12. Absence from Work 
The Council’s relevant supporting attendance policies and procedures should be used
to manage all sickness absence. Where an employee’s disability results in absence from
work, managers should ensure that they support the employee through the procedure.
Further consideration should be given to any reasonable adjustments that would aid
the employee in their attendance at work. 
13. Working environment 
The Council will take reasonable steps to ensure that the working environment enables
disabled employees to take up and retain posts for which they are suitably experienced
and/or qualified. 
Wherever possible disabled employees will be consulted over changes to the working
environment and employment practices to ensure that, so far as is reasonably
practicable, their needs are recognised and met. Page 29 of 276

Page 30

Disability Policy v1.0   9 
Where appropriate, advice about such changes will be sought from the line manager
and professional advice from the Employment and Policy Team, Occupational Health,
Occupational Safety and Wellbeing Teams. 
The Council must seek to establish working conditions which encourage the full
participation of disabled employees where it is reasonably practicable to do so.  The
Council will also do what is reasonably practicable to ensure the retention of existing
disabled employees through the adjustment of work and/or working arrangements,
training or other appropriate measures, where necessary. 
The Council, when investing in new or refurbishing buildings will make every practical
effort to anticipate for the needs of disabled employees. 
14. Access to Work 
There is a government scheme called Access to Work which can help individuals get or
stay in work if they have a physical or mental health condition or disability.  The support
individuals get will depend on their needs. Through Access to Work, individuals can
apply for: 
• a grant to help pay for practical support with their work
• support with managing their mental health at work
• money to pay for communication support at job interviews 
Access to Work can help with extra costs which would not be reasonable for an
employer or prospective employer to pay. 
For example, Access to Work might pay towards the cost of getting to work if the
disabled person cannot use public transport, or for assistance with communication at
job interviews.   
15. Informing of a Disability 
All employees are encouraged to make their disability known to their line manager or
the Employment and Policy Team and to request adjustments to the working
environment as necessary.  Every effort will be made to put reasonable adjustments in
place. 
The Council knows the importance and benefits of having a diverse workforce. Different
people bring different skills and experiences to the workplace at the same time enrich
our workplaces and the work we do.
Page 30 of 276

Page 31

Disability Policy v1.0   10 
The Council gathers and analyses information about the characteristics of its
employees which includes disabled or non-disabled. 
This information tells us about how diverse our workforce is. It helps us understand the
different needs of our employees and where there are disproportionately low numbers
of people with particular characteristics compared to the local population. Most
importantly it can highlight where inequalities exist, and we can then take corrective
action. 
All employees are encouraged to complete the sensitive information tab on mySelf
where the Council gather the diversity information from. Please be assured that this
information is highly confidential and is only ever used anonymously. 
16. Support Mechanisms 
Disability Support Officers are available to offer support to disabled employees.  Their
role will involve:
• helping to raise the profile of issues around disability and how to address and
prevent them
• actively listening and understanding people's experiences
• learning about disability discrimination and using what they learn to influence
others 
The Employee Equality Forum is also another form of support for disabled employees
and their role will be to:
• share experiences
• support each other
• raise issues that need addressing
• host and facilitate events for disabled employees 
Appendix 5 provides a full list of supports available. 
17. How to make a complaint 
The Equality Act says that it would be discrimination “to treat a disabled person in a
particular way which, because of his or her disability, amounts to treating him or her
badly and the treatment cannot be shown to be justified”. 
The Council are required to make reasonable adjustments if any ‘provision, criterion or
practice’ or ‘any physical feature of premises’ places a disabled person at a substantial
disadvantage in comparison with persons who are not disabled. 
Page 31 of 276

Page 32

Disability Policy v1.0   11
Employers have a duty to take reasonable steps in order to prevent the provision,
criterion or practice, or feature, having that effect. 
If an employee feels they are being discriminated against because of their disability or
feels that the Council have failed to make a reasonable adjustment, they can raise a
grievance in the first instance to resolve their complaint. 
18. Review of policy 
The Council is committed to ensuring that this policy and all related procedures are
effective in supporting disabled employees and implementing reasonable adjustments.   
Essential to achieving this aim is adequate investment, and continuous review and
evaluation which will be undertaken when necessary or as determined by a change in
policy, procedure or legislation. 
Page 32 of 276

Page 33

Disability Policy v1.0   12
Appendix 1 
Disability Definitions 
The Equality Act 2010 outlines the following definition of disability 
“You’re disabled under the Equality Act 2010 if you have a physical or mental
impairment that has a ‘substantial’ and ‘long-term’ negative effect on your ability to do
normal daily activities.” 
The act covers disabled people and people who have had a disability in the past. 
Explanations of: 
1. Impairment 
The definition covers physical and mental impairments.  These include:
• Impairments affecting senses, such as sight and hearing
• Mental impairments including learning disabilities and mental illness
(if it is recognised by a respected body of medical opinion) 
The government has issued guidance, under the Act, about whether an
impairment has a substantial or long-term effect.  This guidance does not in
itself impose legal obligations on an employer or service provider, but a
tribunal or court must when considering a complaint about discrimination
take into account any of the guidance which appears to be relevant. 
2. Substantial 
For an effect to be substantial, it must be more than minor or trivial 
Examples: 
The following are examples that are likely to be considered substantial:
• Inability to see moving traffic clearly enough to cross a road safely
• Inability to turn taps or knobs
• Inability to remember and relay a simple message correctly 
3. Long-term 
These are effects that:
• Have lasted at least 12 months; or
• Are likely to last at least 12 months, or
• Are likely to last for the rest of the life of the person affected
Page 33 of 276

Page 34

Disability Policy v1.0   13 
Long-term effects include those which are likely to recur.  For example, an
effect will be considered to be long-term if it is likely to both to recur, and to
do so at least once beyond the 12-month period following the first
occurrence. 
4. Day to day activities 
The act does not define what is considered to be day-to-day activities, however
these are likely to include normal activities carried out by most people on a
regular basis, for example: 
• Using everyday objects such as a keyboard
• Lifting, moving or carrying everyday objects such as a chair
• Having a conversation or using a telephone
• Getting washed and dressed
• Preparing and eating food
• Carrying out household tasks
• Walking and travelling by various forms of transport
• Taking part in social activities 
People who have had a disability in the past are also protected against discrimination,
harassment and victimisation.  This may be particularly relevant for people with
fluctuating and/or recurring impairments/health conditions. 
A number of conditions may be considered to be a disability as outlined below 
1. An individual is treated as disabled without having to show their condition has
a substantial and long-term adverse effect on their ability to carry out normal
day-today activities in the following situations:
a. Where the individual has cancer, HIV infection or multiple sclerosis they
are considered to have a disability from the point of diagnosis
b. Where a consultant ophthalmologist has certified someone as blind,
severely sight-impaired or partially sighted, the Act regards them as
disabled
2. Where an individual has a “progressive condition”, initially the effect on their
ability to carry out normal day-to-day activities may not be sufficiently serious
to amount to a substantial adverse effect.  However, they are treated as
disabled if their condition is likely to have a substantial adverse effect on their
day-to-day in the future.  This means that an individual with a progressive
condition may qualify for protection as a disabled person before the adverse
effects of their condition become serious.  Progressive conditions increase in
severity over time and, for example include dementia, muscular dystrophy and
motor neurone disease. Page 34 of 276

Page 35

Disability Policy v1.0   14
3. Impairments can include: sensory impairments, such as those affecting sight or
hearing; conditions which can range from myalgic encephalomyelitis (ME),
diabetes and arthritis to depression, schizophrenia, phobias, personality
disorders, autism, dyslexia, learning disabilities and injury to the brain; those
affecting body organs such as asthma and heart disease; musculoskeletal
conditions - injury, damage and disorders which affect bones, muscles, joints
ligaments, tendons and nerves; and conditions/effects produced by injury to
the body. 
Employers have a duty to make reasonable adjustments to their practices and
premises to accommodate disabled people, where any arrangements or physical
features of premises cause a substantial disadvantage. Examples of reasonable
adjustment may include: 
• Giving or arranging training
• Providing more flexible working hours or arrangements
• Assigning the person to a different workplace
• Acquiring or modifying equipment
• Making adjustments to premises
• Adjustment to work or working practices (where reasonably practicable) 
The Act also introduced a new public sector equality duty (PSED), which replaces the
general duties in the disability equality duty. The PSED requires the Council to show
due regard to the need to: 
• eliminate discrimination, harassment, victimisation and any other conduct that
is prohibited by or under the Act
• advance equality of opportunity between people who share a relevant
protected characteristic and people who do not share it
• foster good relations between people who share a relevant protected
characteristic and people who do not share it. 
Time off for treatment, specialist reviews and disability related sickness absence will
be taken into consideration in the application of the Councils Supporting Attendance
Policy. 
More detail can found in the HM Government document Equality Act 2010 Guidance.  
Page 35 of 276

Page 36

Disability Policy v1.0   15
Appendix 2 
Employee Adjustment Passport 
Introduction 
The Council is committed to supporting all employees with a disability, long or short-term condition
and/or impairment.  If an employee has a temporary or permanent condition, which could affect their
ability to work, their needs should be assessed to identify adjustments which could be implemented
to help to support the individual at work. 
Scope 
The Employee Adjustment Passport provides a record of the reasonable adjustments that have been
agreed between an employee and their line manager. The purpose of the Passport is to provide a
framework for discussions between employees and managers to agree adjustments required, record
the outcome of these discussions and to provide any new manager with details of agreed
adjustments.   
The passport helps to: 
• Ensure relevant parties are clear about the adjustments that have been agreed, and a record
is held.
• Reduce the need to reassess and renegotiate adjustments each time an employee changes
jobs, is relocated or is assigned a new manager.
• Provide the employee and manager with the basis for future conversations about workplace
adjustments. 
What are reasonable adjustments?
Reasonable adjustments are changes an employer makes to remove or reduce a disadvantage
related to someone's disability. For example: 
• making changes to the workplace
• changing someone's working arrangements.
• finding a different way to do something.
• providing equipment, services, or support 
Reasonable adjustments are specific to an individual person. They can cover any area of work.
It is not enough for employers to provide disabled people with exactly the same working conditions
as non-disabled people. Employers must make reasonable adjustments by law.
Some disabled people might not need or want adjustments, although this might change over time. 
Equality Legislation 
The law (Equality Act 2010) says that employers must make reasonable adjustments for: 
• employees and workers
• contractors and self-employed people hired to personally do the work. Page 36 of 276

Page 37

Disability Policy v1.0   16
• job applicants. 
Employers must make reasonable adjustments when: 
• they know, or could reasonably be expected to know, someone is disabled.
• a disabled staff member or job applicant asks for adjustments.
• someone who's disabled is having difficulty with any part of their job.
• someone's absence record, sickness record or delay in returning to work is because
of, or linked to, their disability. 
The employer must also: 
• make reasonable adjustments for anything linked to someone's disability – for example
an organisation might not allow dogs at work but make a reasonable adjustment for
someone with an assistance dog.
• make sure other people do what's needed for a reasonable adjustment to work – for
example if someone needs information presented in a certain format, making sure
other people at work do that. 
An employer could be liable under the law if they do not do these things. For example, if someone
does not get the reasonable adjustments, they need at work they could make a disability
discrimination claim to an employment tribunal. 
What is reasonable depends on each situation. The employer must consider carefully if the
adjustment:
• will remove or reduce the disadvantage – the employer should talk with the person and
not make assumptions.
• is practical to make.
• is affordable; and
• could harm the health and safety of others. 
The employer does not have to change the basic nature of the job. For example, if someone in a call
centre asks for a job that does not involve taking calls, this might not be reasonable if there is no
other job to give them. 
An employer does not have to make adjustments that are unreasonable. However, they should still
find other ways to support the disabled person. This could include making other adjustments that
are reasonable. 
The majority of adjustments will be simple and inexpensive.  The list below provides some examples
of adjustments, but this is not exhaustive: 
• providing specialist equipment such as a keyboard or mouse
• adapting building access including modifying doorways and/or installing ramps
• adjusting working hours or patterns of work
• allowing time off for rehabilitation, assessment, or treatment
• consideration of seating arrangements
• offering training and development opportunities 
When the agreement should be used 
The agreement should be used when: 
• an employee requests adjustments because they have a disability that affects them at work
or 
• when a manager recognises there is a need. 
Page 37 of 276

Page 38

Disability Policy v1.0   17 
The request for adjustments may be made following medical advice from a GP, Occupational Health
adviser or advice from the Employment and Policy Team when an employee is about to start working
for the Council. The arrangements may be short term – e.g. in the case of a phased return to work
following absence or can be a longer-term arrangement. If the arrangement is short term, this will be
recorded and the arrangement will come to an end on the date specified, unless otherwise reviewed
and agreed. 
Employees may have disclosed their disability previously or this may become known because of a
recent absence, as part of a return to work or attendance review discussion. There may be an
existing arrangement, not formally recorded and this agreement provides an opportunity to formally
record adjustments. 
Managers should also consider that new employees may require a reasonable adjustment at work,
as advised by Occupational Health as part of the Council’s pre-employment health screening
process and should use the agreement to record this. Managers should seek advice from the
Council’s Employment and Policy Team as required. 
The passport is used to record what has been agreed, an implementation date and is signed by both
parties.  An electronic signature will be accepted.  If the employee’s line manager changes, they do
not have to explain their requirements each time and the passport should follow the employee
throughout their career with the Council and should be reviewed and updated on a regular basis.   
Advice and Support 
Advice and guidance to support the Employee Adjustment Passport can be sought from
Occupational Health and the Employment and Policy Team. There should be an initial meeting
between the employee and the manager to discuss and agree required adjustments. The attached
form is used as a framework for the discussion. Primarily the discussion takes place between the
employee and their current line manager. If necessary, an Employment and Policy Adviser can
attend the initial meeting to provide advice and support the process. If they so wish, employees may
be supported at any meetings by a friend, colleague, family member or other. 
Meeting to discuss Employee Adjustment Passport 
At the meeting full consideration will be given to the adjustments requested by the employee,
considering the advice provided by medical professionals, Employment and Policy Advisers and the
exigencies of the service. This will include exploration of all alternative options timescales: for
adjustments to be put in place; length of time that tailored adjustments will be required; and for
review, etc. 
If a Personal Emergency Evacuation Plan (PEEP) is required for the employee advice should be
sought from the Safety and Wellbeing Team.
Recording the Outcome 
It may not be necessary to complete all parts of the form and therefore only the relevant sections
should be completed. For example, the section on emergency contacts is only relevant to employees
who know that the nature of their condition may require emergency treatment or advice. Once the
adjustments have been agreed they should be recorded on the form and signed by the manager and
the employee. The manager should record the details of the adjustments on ITrent.  The manager
should then send a copy of the completed form to the Employment and Policy Team. The employee
should retain a copy for their own records and ensure it is made available to any new manager or if
they change job. 
Page 38 of 276

Page 39

Disability Policy v1.0   18
What happens if there is a change in circumstances?
It is the employee’s responsibility to discuss and agree with their manager any change to their
personal circumstances such as a change in their condition. If the employee changes job and/or line
manager they should make their new line manager aware of the adjustments in place, as detailed
on the form. A formal meeting is only required if there is a need to change the adjustments in place.
Any new adjustments should be recorded on a separate form and processed as stated previously.
If there is a service need to change the employee’s duties/ tasks, then a review of the adjustments
will be necessary before any new duties/ tasks are implemented.
A change in line management does not require the existing adjustments to be renegotiated as they
have previously been agreed. 
What happens if you can’t come to an agreement?
If an employee and their manager cannot agree the adjustments to be put in place, then either should
discuss this with the Employment and Policy Team in the first instance.
Sources of further information and support
Further information and advice relating to reasonable adjustments is available from a number of
sources including: 
Employment and Policy Team
Safety and Wellbeing Team     
Equality Team
Funding and Procuring Adjustments
It is the employers’ responsibility to fund reasonable adjustments and most adjustments for
employees cost nothing or very little. However, some disabled employees will require practical
support with work, for instance: specialist equipment and assistive software; support workers, like
a BSL interpreter, a job coach, or a travel buddy; costs of travelling to work, if they cannot use public
transport; adaptations to a vehicle so they can get to work; or physical changes to the workplace.
Access to Work can provide grants to disabled employees to help with practical support at work;
mental health support; and communication support at interviews. 
If it has been identified that the employee needs specific assistive technology or telephonic
equipment, the manager should contact IT who will undertake an assessment and arrange for the
appropriate assistive technology to be put in place.
Please see the attached step by step process for dealing with reasonable adjustments.
Training for managers on disability equality and reasonable adjustments is also available by
contacting the Talent and Organisation Development Team tod@northlan.gov.uk. 
Page 39 of 276

Page 40

Disability Policy v1.0   19
Employee Adjustment Passport 
Employee Name  Employee Number 
Manager Name /
Position 
Date of Request  Date of Agreement 
Date adjustment
implemented  Date of first Review 
With the aim of supporting you, this agreement may be reviewed and amended as necessary, but
at the very least once a year or as follows; 
• At any regular one-to-one meeting / supervision.
• At a return to work or attendance review meeting, following a period of sickness absence.
• At six monthly and/or annual PRD conversations.
• Before a change of job or duties or introduction of new technology or ways of working.
• Before or after any change in circumstances for either party.
• On request 
This agreement may be put in place before an employee commences employment with the
Council. 
Q1 Please tell us about your disability or condition that affects your daily life 
When completing this section please think about the following:
• how you communicate and interact with people 
• how you plan and organise tasks 
• how you deal with sensory issues such as sight or hearing loss
• how you get around 
• how you deal with unexpected change
• how you access support services 
Page 40 of 276

Page 41

Disability Policy v1.0   20
Q2 Do you need support to get to work? This could include help when using public transport,
a taxi, adaptations to a vehicle or a travel buddy
☐ No  ☐ Yes   If ‘Yes’ please provide details?   
Q3 Do you need support to access work premises? This could include lifts, ramps for a
wheelchair, widened doors, reserved parking or clear signage
☐ No  ☐ Yes   If ‘Yes’ please provide details?   
Q4 Does your condition vary depending on the day, time of day or the environment
or situation you are in
☐ No  ☐ Yes   If ‘Yes’ please provide information on how often this happens and what extra
help would you need when things are most difficult 
Page 41 of 276

Page 42

Disability Policy v1.0   21
Q5 Do you need support communicating and interacting with other people? 
This could include: 
• adjusted interview process to take into account differences in communication styles, for
example additional processing time, prompting to give more or less information
• a British Sign Language interpreter or video relay support service support or lip speakers
• a notetaker.
☐ No  ☐ Yes   If ‘Yes’ please provide details? 
Q6 Do you require any specialist IT programmes? 
This could include programmes like: • Jaws • Dragon • ZoomText • Read and Write Gold •
document reading equipment
☐ No  ☐ Yes   If ‘Yes’ what have you used? 
Supplementary Questions 
Would you need training to use any specialist IT programmes? 
☐ No  ☐ Yes  If ‘Yes’ which ones? 
Page 42 of 276

Page 43

Disability Policy v1.0   22
Q7 Do you require any specialist equipment? 
This could include:  office equipment like a mouse, keyboards, chairs and desk including a
fixed desk • a braille reader • a handheld magnifier • hearing aids • a wheelchair • noise
cancelling headphones.
☐ No  ☐ Yes   If ‘Yes’ please provide details? 
Q8 Do you need any changes to the location that you would work in?
This could include adjustable lighting or quiet spaces
☐ No  ☐ Yes   If ‘Yes’ please provide details? 
Q9 Do you need someone with you at work to support you? 
This could include a support worker or job coach to support you with workplace coping
strategies, such as understanding expectations, following instructions, extra processing time,
explaining unwritten rules or supporting your relationship with your manager.
☐ No  ☐ Yes   If ‘Yes’ please provide details? 
Other Relevant Information 
Please provide any other information that is relevant to your disability and your employment
with the Council 
Page 43 of 276

Page 44

Disability Policy v1.0   23
In order to support me, my colleagues should be made aware of the following details
about my disability 
Is a personal emergency evacuation plan (PEEP) required?       
☐ No  ☐ Yes  
If ‘yes’ the line manager must carry this out – guidance can be sought from the Safety &
Wellbeing Team   
What adjustments have been agreed 
The following reasonable adjustments have been
agreed
Date
implemented
Date ended (if
appropriate)   
Page 44 of 276

Page 45

Disability Policy v1.0   24
I will let my line manager know if there are changes to my condition which have an effect on my
work and/or if the agreed adjustments are not working.  We will then meet to discuss any further
reasonable adjustments or changes that could be made 
Employee Signature  Date 
Manager Signature  Date 
A copy of the Employee Adjustment Passport will be recorded on ITrent and will follow the
employee through their employment cycle 
Page 45 of 276

Page 46

Disability Policy v1.0   25
Appendix 3
Reasonable Adjustments Process (including Assisted Technology)
What are Reasonable Adjustments?
Reasonable Adjustments at work apply to all workers, including trainees, apprentices and contract
workers.  Under the Equality Act 2010, there is a legal duty on employers to make reasonable adjustments
for disabled employees.  As part of the act, employers are required to ensure that employees with
disabilities, physical or mental health conditions are not substantially disadvantaged when applying for
or doing their jobs.  Disabled workers, as far as reasonable, must have the same access to everything
involved from applying for a job to doing their job as a non-disabled person.  The act advises that any
proposed adjustment must be effective, practical and significant, however it is important to recognise
that one size does not fit all, and individual circumstances must be considered when looking at
adjustments.
Examples of Reasonable Adjustments:
• Acquiring or modifying equipment
• Modifying instructions or reference manuals
• Modifying the technology an employee uses to undertake their duties.
• Providing a reader or interpreter
• Adjusting working area
• Altering working hours and pattern
• Adjusting premises in which the person works
It is recognised that some adjustments can be expensive, however this is not a reason not to make
adjustments for individual employees.  If you are concerned about proposed/required adjustments,
please talk to a member of the Employment and Policy Team for further advice and support.  The email
address for the Team is EmploymentPolicyTeam@northlan.gov.uk.
Who pays for Reasonable Adjustments?
The employer is responsible for paying for any reasonable adjustments and therefore the cost of
equipment will come out of service budgets.  Access to Work can provide grants to disabled employees
to help with practical support at work; mental health support; and communication support at interviews. 
Who decides what is Reasonable?
Legal precedence does exist to provide an indication of what is considered reasonable, but it varies from
person to person and organisation to organisation, however most reasonable adjustments can be agreed
through communication and discussion with the employee.  If you are unsure of what is a reasonable
adjustment contact your Employment and Policy Adviser for support. 
Page 46 of 276

Page 47

Disability Policy v1.0   26 
1. Process of Reasonable Adjustments for New Employees to the Council
Step 1:
When a candidate for a post has been advised that they have been successful for the job, the manager
should review the Function Based Health Questionnaire that has been completed by the candidate.  If
the employee has detailed any disabilities, physical or mental health conditions, they should contact the
employee to ask if any adjustments are required to allow them to undertake the duties and
responsibilities of the post and/or access their work location.  (If the conditions listed are of concern, the
manager should arrange for a pre-employment medical assessment to take place after discussing the
matter with a member of the Employment and Policy Team).
Step 2:
If the new employee advises that they need any form of adjustment to their working environment,
equipment or duties, the manager must complete an Employee Adjustment Passport form either over
the phone, teams or in person. 
Step 3:
If you can, arrange a DSE Assessment and Workstation Assessment before the employee commences
but it must be completed before or after they start.  The employee should be able to complete this
themselves.
However, where the employee’s medical condition or disabilities are complex, the manager should enlist
the support of the Occupational Health and Wellbeing Team to undertake the assessments.
Step 4:
If it is identified that the employee requires specific equipment such as a specific mouse, laptop riser or
anything small for their workstation, the manager should arrange for these to be ordered as part of the
normal stationary/office equipment ordering process.  This should, where possible, be done in advance
of the employee commencing employment with the Council.
Step 5:
Where it has been identified that the employee requires a specific desk or chair or other piece of large
office equipment, specialist support should be sought by the manager from one of the following
organisations:
• Hetley’s Ltd, 5 Mid Road, 
Blairlinn Industrial Estate, Cumbernauld G67 2TT           
Contact David Devoy, 07725 846451, 01236 729524 
www.hetleys.com
• Posturite Ltd                                                                                                                         
Contact Scott Bottomer, 07584 488899, 
ScottBottomer@posturite.co.uk 
The manager should contact the company who will arrange an individual assessment of the employee’s
needs and advise of the equipment required. It should be noted that these organisations tend to offer
the most expensive option first and therefore managers are encouraged to question if cheaper
alternatives are available.  Equipment should be ordered from the organisation as necessary, where
possible, in time for the employee commencing in their post.   
Page 47 of 276

Page 48

Disability Policy v1.0   27
Step 6:
If it has been identified that the employee needs specific assistive technology or telephonic equipment,
the manager should contact IT who will undertake an assessment and arrange for the appropriate
assistive technology to be put in place.
Step 7:
Where it is identified that the employee requires support to travel to and from work, and/or a significant
number of adjustments are required, the manager should ask the employee to contact Access to Work. 
An Access to Work grant is money for practical support to help someone do their job. It is for people with
a disability, health or mental health condition.  The money provided can support things such as: 
• an expert assessment
• specialist equipment
• travel when public transport cannot be used.
• a support worker (only if assessed by Access to Work as being required)
How much an individual gets will depend on their circumstances, their allowances and the size of the
employer.  More information can be accessed here.
Step 8:
The Employee Adjustment Passport should be fully completed by the manager and recorded on ITrent. 
The Employee Adjustment Passport should follow the employee throughout their career with the Council
and should be reviewed and updated on a regular basis.  
Step 9:
If the employee leaves the employment of the Council the manager must ensure that all equipment is
returned to the Council.
2.  Process of Reasonable Adjustments for Existing Employees of the Council
Step 1:
Where an existing employee of the Council advises their manager that they need reasonable adjustments
applied to their work or working environment, they should be sent to Occupational Health for
assessment and advice on what adjustments are required.   (An occupational health assessment may not
be necessary for cases of short-term injury/incapacity such as a broken wrist or leg as adjustments will
be easily identified and put in place without the requirement for medical advice.)
Step 2:
If occupational health/employee advises that they need any form of adjustment to their working
environment, equipment or duties, the manager must complete the Employee Adjustment Passport form
either over the phone, on teams or in person with the employee.
Step 3:
It is advisable to request that a further DSE Assessment and Workstation Assessment is undertaken with
the support of the Occupational Health and Wellbeing Team to ensure that any existing equipment
remains suitable or to identify alternatives.
Step 4:
If it is identified that the employee requires specific equipment such as a specific mouse, laptop riser or
anything small for their workstation, the manager should arrange for these to be ordered as part of the
normal stationary/office equipment ordering process.   
Page 48 of 276

Page 49

Disability Policy v1.0   28
Step 5:
Where it has been identified that the employee requires a specific desk or chair or other piece of large
office equipment, specialist support should be sought by the manager from one of the following
organisations:
• Hetley’s Ltd, 5 Mid Road, 
Blairlinn Industrial Estate, Cumbernauld G67 2TT           
Contact David Devoy, 07725 846451, 01236 729524 
www.hetleys.com
• Posturite Ltd                                                                                                                         
Contact Scott Bottomer, 07584 488899, 
ScottBottomer@posturite.co.uk 
The manager should contact the company who will arrange an individual assessment of the employee’s
needs and advise of the equipment required. It should be noted that these organisations tend to offer
the most expensive option first and therefore managers are encouraged to question if cheaper
alternatives are available.  Equipment should be ordered from the organisation as necessary, where
possible, in time for the employee commencing in their post.   
Step 6:
If it has been identified that the employee needs specific assistive technology or telephonic equipment,
the manager should contact IT who will undertake an assessment and arrange for the appropriate
assistive technology to be put in place.
Step 7:
Where it is identified that the employee requires support to travel to and from work, and/or a significant
number of adjustments are required, the manager should ask the employee to contact Access to Work. 
An Access to Work grant is money for practical support to help someone do their job. It is for people with
a disability, health or mental health condition.  The money provided can support things such as: 
• an expert assessment
• specialist equipment
• travel when public transport cannot be used.
• a support worker (only if assessed by Access to Work as being required)
How much an individual gets will depend on their circumstances, their allowances and the size of the
employer.  More information can be accessed here.
Step 8:
The Employee Adjustment Passport should be fully completed by the manager and recorded on ITrent. 
The Employee Adjustment Passport should follow the employee throughout their career with the Council
and should be reviewed and updated on a regular basis.  
Step 9:
If the employee leaves the employment of the Council the manager must ensure that all equipment is
returned to the Council. 
Page 49 of 276

Page 50

Disability Policy v1.0   29
Appendix 4
Four stages of the process of Discussing a Disability with Disabled
Employees 
Stage 1 – initial dialogue 
The initial step is for the employee to talk to their line manager about their disability
and to record the nature of their disability on Myself. (Employees should note that
changing their disability status on Myself is confidential and will not alert your manager
that this has been changed).  If the line manager is aware of the disability and/or is
seeing signs that a disability has an impact upon the employee’s ability to carry out their
duties, they should initiate discussion with them.  Direct communication is required
with the line manager to start the process of identifying support needs. 
The line manager should consult with the Employment and Policy Team if they require
assistance during this process.  If for any reason the employee does not feel able to
have the initial conversation with their line manager they should speak to the
Employment and Policy Adviser who will seek to facilitate a three-way dialogue involving
themselves, the employee and line manager. 
Following this it may be necessary to make a referral to occupational health for advice
on the reasonable adjustments.  
If any potential or actual health and safety issues, for example, fire safety and the need
for a Personal Emergency Evacuation Plan (PEEP) are identified these need to be
brought to attention of the Occupational Safety and Wellbeing Team. 
Stage 2 – assessment of disability 
It is important that the aspects of the disability are assessed before seeking to identify
the most appropriate course of action: 
• The nature and current level of severity of the disability
• The impact of the disability upon the employee’s work
• The impact of work upon the health of the employee
In order to obtain an assessment, in most cases a referral should be made to
occupational health who will make the assessment.  They will often obtain information
from those providing medical care to the employee. 
Page 50 of 276

Page 51

Disability Policy v1.0   30
Stage 3 – assessment of impact and needs 
Once the nature and an understanding of the current impact on work of the disability
is established in discussion with the employee, reasonable adjustments may then be
considered to enable the employee to undertake their role. 
Employees should also be made aware of the Access to Work scheme who can assist in
supporting the reasonable adjustments.  
It is the responsibility of the line manager to decide what adjustments can reasonably
be made in the specific context in which the employee is working.   
Stage 4 – action 
Following assessment one or more of a number of courses of action may be required 
• Changes to the job role to role
• Provision of equipment and auxiliary aids
• Making changes to the workplace
• Redeployment options
• Ill health retirement only where appropriate and necessary to consider 
Reasonable Adjustments To Role 
In some cases, it may be that the employee is unable to undertake a limited number of
duties associated with their role. Where the changes are minor and do not substantially
affect the role, it may be possible to redistribute work within the section so that they
can continue in their role. However, where adjustments to the role are significant,
discussion regarding the impact of these adjustments needs to take place. 
The Employment and Policy Team should be involved in discussions with the line
manager prior to any role adjustment(s) being agreed. This is to ensure that what is
agreed is appropriate for the employee and any colleagues whose duties may be
affected by any proposed changes. The employee and their line manager should
discuss on an on-going basis that the adjustments continue to be effective. 
Provision Of Equipment and Auxiliary Aids Identified Through Assessment 
This might range from a specialist chair for someone experiencing back, neck or
shoulder pain, to voice activated software for someone diagnosed as dyslexic through
to a suite of equipment for someone with a serious visual impairment. 
Page 51 of 276

Page 52

Disability Policy v1.0   31
Provision Of Physical Adjustments To Council buildings 
In consultation with the Health and Wellbeing Team physical adjustments to Council
buildings as a reasonable adjustment will be given due consideration. 
Redeployment Options 
Where it is concluded that the nature and impact of the disability means it is not
possible to make adjustments for the employee to safely continue in their current role
the Council has an obligation to explore whether there are vacancies in roles that the
employee could undertake. The redeployment procedure should be followed. 
Page 52 of 276

Page 53

Disability Policy v1.0   32
Appendix 5 
List of Supports 
Name Contact Details Service Provided
Employment
and Policy
Team
employmentpolicyTeam@northlan.gov.uk  Advice and guidance on
Council’s policies and
procedures
Employee
Assistance
Programme 
https://workwellnl.co.uk/think-
well/employee-assistance-programme/
Free 24-hour phone number 0800 111
6387.
The Employee
Assistance Programme
(EAP), which is 
provided by Vita Health
Group, is available to
help make life easier,
whether the issue is
personal or work-
related.
Employee
Equality
Forum
employeeequalityforum@northlan.gov.uk  Employee Equality
Forum will support
disabled employees via
sharing experiences, a
support for each other
and raise issues that
need addressing 
Disability
Support
Officer 
Contact Employment and Policy Team for
further information
The role of the
Disability Support
Officers will involve
helping to raise the
profile of issues around
disability, listen and try
to understand people’s
experiences, learn
about disability
discrimination and use
what they learn to
influence others.
Occupational
Health online
The web address is www.my-eap.com 
organisation access code is NLCWELL .
The online wellbeing
hub my-EAP has self-
Page 53 of 276

Page 54

Disability Policy v1.0   33
wellbeing hub
my-EAP
help support, articles,
videos, podcasts and
health assessments on
a range of issues such
as health and
wellbeing,
emotional/personal,
homelife, work/career,
legal and money
worries. 
Tackling
poverty Team
TPTeam@northlan.gov.uk 
01698 332551
Financial support
Access to
work 
https://www.gov.uk/access-to-work  Access to Work can
help you get or stay in
work if you have a
physical or mental
health condition or
disability 
Page 54 of 276

Page 55

Appendix 2 
This is a controlled document. The digital PDF file published on InsideNL is the
control copy. 
 Always access this document from the control location.
 When you open this document, your device may automatically download it.
If it does, you should still open it from the control location in future.
 You can print this document, but a printed copy isn’t the control copy.
 Don’t save any digital copies of this document anywhere. This includes your
device, USB flash drives, network drives, OneDrive, Teams/SharePoint, or
any other digital storage device, system, service, or location. 
Neonatal Care
Leave Policy
Version 1.0, 7/03/2025  
Page 55 of 276

Page 56

Neonatal Care Leave Policy v1.0
Document control
Title Neonatal Care Leave Policy
Governance group Policy and Strategy Committee
Owner Fiona Whittaker, Chief Officer People
Resources 
Contact whittakerf@northlan.gov.u
k 
Author Lindsay Millar, Employment and Policy Officer Contact millarl@northlan.gov.uk 
Revision history
Version Originator Review start date Revision description and record of change
1 Lindsay Millar           
Document approvals
Version Governance group Date approved Date approval to be
requested 
(if document still in draft)
1 Finance and Resources  May 2025         
Consultation record (for most recent update)
Consultation status Stakeholders consulted
Stakeholders
consulted and dates
People Resources Team
Single Status Trade Unions
Teaching Trade Unions 
Strategic alignment
Plan for North Lanarkshire
Improving the Council’s Resource Base – A Workforce Strategy that is built around the needs of the
Council (as a single resource base) to deliver the priority outcomes, ensuring future workforce
requirements, new skills and innovative approaches, and succession planning are recognised. 
Next review date
Review Date This policy will be reviewed on a regular basis to ensure that it remains
compliant with all relevant legislation.  
Page 56 of 276

Page 57

Neonatal Care Leave Policy v1.0
Contents
1. Introduction ...................................................................................................................................... 1
2. Scope.................................................................................................................................................. 1
3. Purpose ............................................................................................................................................. 1
4. Eligibility ............................................................................................................................................. 1
5. Neonatal care definition ................................................................................................................. 2
6. Key principles of neonatal care leave ........................................................................................... 2
6.1 Two tier system .......................................................................................................................... 2
6.2 Key principles ............................................................................................................................. 3
6.3 Neonatal care pay ...................................................................................................................... 3
7. Procedures ........................................................................................................................................ 3
7.1 Notifying the Council ................................................................................................................. 3
7.1.1 Notice Periods ......................................................................................................................... 4
7.2 Taking NCL .................................................................................................................................. 4
7.3 Interaction with other statutory leave .................................................................................... 4
8. During Neonatal Care leave ........................................................................................................... 6
9. Returning to work ............................................................................................................................ 6
10. Support .............................................................................................................................................. 7 
Appendix A: Internal Support
Appendix B: External Support
Appendix C: Frequently Asked Questions 
Appendix D: Standard Letters 
A note about plain English
This document follows plain English guidance, in line with our corporate commitment to
clear communications. In particular, it uses the following terms.
 ‘We’, ‘us’ and ‘our’ when referring to the Council (as an organisation), our collective
responsibilities (as authorised users of Council IT assets), and when discussing specific
activities.
 ‘You’ and ‘your’ when referring to the individual responsibilities and actions of
authorised users of Council IT assets.
Page 57 of 276

Page 58

Neonatal Care Leave Policy v1.0   1
1. Introduction 
Legislation introduced on 6 April 2025 allows employees to take up to 12 weeks leave so
they can spend more time with their baby, if they are admitted into hospital within the
first 28 days of birth and who have a continuous stay in hospital of 7 full days or more.   
This leave can be taken in addition to other leave entitlements such as maternity and
paternity leave.  This policy should be read in conjunction with the Council’s Maternity
Leave, Adoption, Parental Leave and Special Leave policies. 
2. Scope 
This policy applies to all Council employees who meet the eligibility criteria. 
3. Purpose 
The purpose of this policy is to inform employees of their right to request a period of
Neonatal Care Leave (NCL) when their baby requires neonatal care.  This leave is in
addition to existing parental leave entitlements namely: maternity, adoption, paternity,
shared parental leave, parental bereavement leave. 
4. Eligibility 
Employees who have a child on or after 6 April 2025 and meets the definition of
neonatal care as outlined in Section 5 of this policy will be eligible to request Neonatal
Care Leave. Employees must have a qualifying relationship: 
• Child’s parent, intended parent, or partner of child’s mother at date of birth; or
• Child’s adopter, prospective adopter, or partner of either at date of placement 
Statutory Neonatal Care Leave is a day one employment right. 
Statutory neonatal care pay requires: 
• 26 weeks’ service from the end of “relevant week”, and 
• Normal weekly earnings over eight-week period ending with end of “relevant
week” of not less than lower earnings limit per week for national insurance
contributions 
The relevant week is as follows:
Page 58 of 276

Page 59

Neonatal Care Leave Policy v1.0   2 
• If employee is entitled to SMP or SPP (birth), relevant week is 15th week before
expected week of childbirth.
• If employee is entitled to SAP or SPP (adoption) adoption, relevant week is week
in which they are notified of being matched with child for adoption.
• Otherwise, relevant week is the week immediately before week in which the
neonatal care begins. 
5. Neonatal care definition 
Neonatal care means care of a medical or palliative nature which lasts for at least 7 full
consecutive days within the first 28 days of birth.   
Neonatal care is: 
• Medical care received in hospital
• Medical care received in any other place providing:
o Child was an inpatient in hospital and needs continuing care after leaving
the hospital;
o The care is under the direction of a consultant; and
o The care involves ongoing monitoring and visits from healthcare
professionals arranged by the hospital where child was an inpatient
• Palliative or end of life care 
6. Key principles of neonatal care leave 
6.1 Two tier system 
Neonatal Care Leave is split into two tiers: 
• Tier 1 period begins when the child starts receiving neonatal care which continues
without interruption for a period of at least seven days beginning the day after the
day on which the care starts. It ends on the seventh day after child stops receiving
neonatal care.  During the tier one period the leave can be taken in non-
consecutive blocks of at least one week at a time. 
• Tier 2 period is any other time after tier one periods ends during which the
employee is entitled to neonatal care leave up until 68 weeks after the child’s birth. 
During tier two period the leave must be taken in one continuous block. 
Parents can take up to 12 weeks over both tiers, not 12 weeks in each tier. 
Page 59 of 276

Page 60

Neonatal Care Leave Policy v1.0   3
6.2 Key principles 
The following key principles apply to neonatal care: 
• Eligible employees are entitled to one week’s neonatal care leave for every
uninterrupted week the child receives neonatal care.
• The minimum period is one week’s neonatal care leave.
• The maximum period is 12 weeks’ neonatal care leave.
• Both parents are entitled to take neonatal care leave.
• The earliest neonatal care leave can be taken is after the child has received 7 full
days of uninterrupted care which is counted from the day after neonatal care
started.
• Neonatal care leave must be taken no later than 68 weeks from the child’s date
of birth.
• For any week in which the employee has more than one child in neonatal care,
the employee only accrues one week neonatal care leave.  (e.g. there is no double
entitlement for twins who both receive neonatal care).
• In the unfortunate event that a baby is admitted to neonatal care (for a period of
at least 7 consecutive days), discharged, and then readmitted to neonatal care
(for a period of at least 7 consecutive days), providing that the second admittance
occurs within 28 days of the birth, both instances will count towards neonatal
care leave. 
6.3 Neonatal care pay 
Employees who meet the criteria for neonatal care pay will receive the following: 
• payment will be at the same rate as other family-related statutory payments: or
• 90% of average weekly earnings where average weekly earnings are less than
other family related statutory payments 
The maximum entitlement to neonatal care pay is also 12 weeks.  The weekly rate
increases annually every April in line with other family-related statutory payments. 
7. Procedures 
7.1 Notifying the Council 
Employees should notify their line manager if their baby has been admitted into
neonatal care (for at least 7 full consecutive days).  The line manager should record the
date that the baby was admitted into neonatal care on Itrent and discuss with the
employee their leave options.   
Page 60 of 276

Page 61

Neonatal Care Leave Policy v1.0   4
The employee should notify their line manager once the baby has been discharged
from neonatal care.  The line manager should record the date that the baby was
discharged on Itrent.  Once the leave options have been agreed and the neonatal dates
have been confirmed, this should be recorded on Itrent. 
7.1.1 Notice Periods 
Employees requiring neonatal care leave during the Tier 1 period must notify their line
manager on the first day of their absence before they are due to start work (unless it is
not reasonably practicable to do so, however they should notify their line manager at
the first available opportunity). 
For a single week of neonatal care leave during Tier 2, employees should provide 15
calendar days’ notice in writing before the first day of neonatal care leave. (see
Appendix D). 
For two or more consecutive weeks’ neonatal care leave during the Tier 2 period, the
employee should provide 28 calendar days’ notice in writing before the first day of
neonatal care leave (see Appendix D). 
The Council can mutually agree to waive notice requirements. 
Employees can contact the Employment and Policy Team for support and advice to
discuss their options at any time.   
7.2 Taking Neonatal Care Leave 
If the employee is the primary carer (and taking a period of maternity or adoption
leave), the leave can be taken after their maternity or adoption leave has ended or
curtailed if moving onto Shared Parental Leave.  They can choose to take this leave
immediately after maternity/adoption leave (before they return to work) or at a
different time (no later than 68 weeks after the baby’s date of birth). 
The employee should provide notice to their line manager, as outlined above in line
with Tier 2 notice period, when they intend to take the leave.   
7.3 Interaction with other statutory leave 
If the employee is taking a period of paternity leave, shared parental leave, parental
leave or parental bereavement leave, more flexibility can be provided as to when the
leave can be taken.  The table below outlines the eligibility entitlement and timings for
each leave type. 
Page 61 of 276

Page 62

Neonatal Care Leave Policy v1.0   5
Neonatal Care Leave ends if interrupted by other statutory leave, however unused
Neonatal Care Leave can be resumed, as long as they are still within the Tier 1 or Tier 2
period. 
• Tier 1- the remaining leave must be taken immediately after completing the other
period of statutory leave.
• Tier 2- the remaining leave must be taken consecutively with other Neonatal Care
Leave. 
Employees cannot begin Neonatal Care Leave in the Tier 2 period if it will be interrupted
by other statutory leave.  Employees do not need to provide new notice to resume leave
after an interruption. 
Leave Type Leave Entitlement Neonatal leave
entitlement 
Paternity  Eligible employees can take up to 4 weeks
paternity leave.  This is broken as
• 1-week ordinary paternity leave
• 1-week maternity support leave
• 2 weeks occupational paternity
leave 
All weeks are paid at full pay 
All paternity leave must be taken within 12
months from the date of the child’s birth 
Eligible employees must have
taken their neonatal leave no
later than 68 weeks from the
child’s date of birth 
Eligible employees would be
able to use some periods of
paternity leave then neonatal
care leave then use the
remainder of the paternity
leave.
Maternity  All employees are entitled to 52 weeks
maternity leave regardless of their 
length of service. 
Maternity cannot be broken up and must
be taken as one continuous block
Eligible employees must have
taken their neonatal care
leave no later than 68 weeks
from the child’s date of birth
which will tend to be at the
end of maternity leave 
Shared
Parental 
Eligible employees can take up to 50 weeks
Shared Parental Leave (SPL) between
them. 
The mother/primary adopter must curtail
their maternity/adoption leave. 
The mother/primary adopter’s partner
must have taken their paternity leave
before SPL can commence. 
Eligible employees must have
taken their neonatal care
leave no later than 68 weeks
from the child’s date of birth 
In the case of SPL, neonatal
leave can be taken during this
period as employees can
pause and restart their leave
providing leave is taken
Page 62 of 276

Page 63

Neonatal Care Leave Policy v1.0   6
SPL must be taken within one year of the
birth/placement of the child.
within 1 year of the child’s
birth
Parental
Leave (unpaid) 
Employees are entitled to 18 weeks leave
for each child and adopted child, up to
their 18th birthday.  This leave is unpaid. 
Up to a maximum of 4 weeks can be
requested each year for each child. 
Eligible employees must have
taken their neonatal care
leave no later than 68 weeks
from the child’s date of birth
Parental
bereavement
Eligible employees can take 2 weeks paid
leave for each child who has died or was
stillborn. 
Employees can take this leave in one block
or in two blocks.  Employees who suffer a
stillbirth or neonatal death after 24 weeks
of pregnancy will retain their entitlement
to maternity/adoption/paternity leave in
addition to Parental Bereavement Leave.   
This leave must finish within 56 weeks of
the date of the death or stillbirth
Eligible employees must have
taken their neonatal care
leave no later than 68 weeks
from the child’s date of birth 
8. Terms and Conditions During Neonatal Care leave 
All terms and conditions remain the same during a period of neonatal care leave (except
salary which will either be paid at statutory neonatal care pay or unpaid dependant on
the eligibility criteria set out in section 4 being met). 
9. Returning to work 
Employees should refer to the relevant parental leave policy for details on planning for
their return to work. 
The Council understands that returning to work can be a difficult time for parents,
particularly those who have experienced a traumatic and upsetting time seeing their
baby in a neonatal ward.  Babies can have ongoing medical needs requiring regular
hospital appointments and check-ups when parent returns to work.  The Council will
support time off with pay to allow parents to attend these appointments in line with
the Council’s Special Leave Policy.   
Page 63 of 276

Page 64

Neonatal Care Leave Policy v1.0   7
10. Support 
Any questions employees have about matters relating to this policy should be raised
with the Employment and Policy Team.  Any work-related issues should be addressed
with their line manager.  Further internal and external supports can be found in
Appendix A and Appendix B. 
Employees may be able to claim for funds via the Scottish Government Young Patients
Family Fund which is designed to provide a financial contribution towards the cost of
having a child (under 18) in hospital which includes neonatal care.  Expenses can be
claimed for transport, meals, parking and accommodation.
Page 64 of 276

Page 65

Neonatal Care Leave Policy v1.0   8
Appendix A: Internal Support 
Name Contact Details Service Provided
Employment and
policy team
Employmentpolicyteam@northlan.gov.uk  Advice and guidance
on Council’s policies
and procedures
Employee
assistance
programme 
https://workwellnl.co.uk/think-
well/employee-assistance-programme/ 
Free 24-hour phone number 0800 111
6387.
The Employee
Assistance
Programme (EAP), is
provided by Vita
Health Group, is
available to help
make life easier,
whether the issue is
personal or work-
related.
Tackling poverty
team
TPteam@northlan.gov.uk   
01698 332551
Financial support
Occupational
Health online
wellbeing hub
my-EAP
The web address is www.my-eap.com
organisation access code is NLCWELL.
The online wellbeing
hub my-EAP has self-
help support, articles,
videos, podcasts and
health assessments
on a range of issues
such as health and
wellbeing,
emotional/personal,
homelife,
work/career, legal
and money worries. 
Page 65 of 276

Page 66

Neonatal Care Leave Policy v1.0   9
Appendix B: External Support 
Name Contact Details Service Provided
Tommys – pregnancy
and baby charity
https://www.tommys.org/baby-
loss-support 
Sadly, some babies are
lost during pregnancy,
birth, or shortly
afterwards. This
organisation has
information and
support for anyone who
has experienced the
loss of a baby, whether
through miscarriage,
stillbirth, neonatal
death, or termination
for medical reasons.
Bliss https://www.bliss.org.uk   
Do you need emotional
support, information or have a
question about neonatal
journey? Our team is here to
help you whatever stage you
are at.  You are not alone. 
Email us at hello@bliss.org.uk
Tel: 020 7378 1122 
To support parents and
families of premature or
sick babies 
Page 66 of 276

Page 67

Neonatal Care Leave Policy v1.0   10
Appendix C: Frequently Asked Questions 
My baby is born before 6 April 2025 and requires neonatal care.  Am I entitled to
the leave? 
Under the new statutory scheme, there is no entitlement to Neonatal Care Leave (and
pay).  The baby must be born on or after 6 April 2025. 
My baby has been admitted into neonatal care at birth.  What do I need to do? 
As soon as is reasonably practicable, you should contact your line manager to notify
them of the situation. In the event that your baby spends 7 consecutive days in neonatal
care, you will be eligible to request neonatal care leave “NCL”. You should ensure that
your line manager is made aware of the admission and discharge date in order to
process the leave. NCL must be taken no later than 68 weeks from the child’s date of
birth. 
• For employees taking maternity or adoption leave: NCL can be used after your
family leave has ended.
• For employees taking Shared Parental Leave: NCL can be taken before, during or
after your leave.
• For all other family leave types (e.g. paternity): NCL can be taken before or after
your leave. 
Is Neonatal Care Leave paid? 
If you meet the eligibility Neonatal Care Leave will be paid at the statutory rate.  If you
do not meet the eligibility criteria, you can still take this leave however this will be
unpaid. Note: The leave is pro-rated to your contracted weekly hours of work. 
Do I need to take neonatal care leave immediately after other family leave? 
No. NCL can be taken at any time up until 68 weeks from the child’s date of birth.  
If you are not taking the leave immediately or directly after a period of family leave, you
will need to provide notice to your line manager as stated within the policy. 
Do I need to take the neonatal care leave (NCL) all at once? 
During the Tier 1 period you do not need to take the NCL all at once.  You can take NCL
in non-consecutive blocks however the minimum leave you can take in a block is one-
week.  However, when in Tier 2 period the NCL must be taken in one continuous block. 
Employees must ensure that advanced notice is provided to the line manager in order
to take this leave if the leave is not being taken immediately or directly after a period of
family leave. 
Page 67 of 276

Page 68

Neonatal Care Leave Policy v1.0   11
What is the mother’s entitlement if the baby is born early? 
For mother’s early birth will automatically trigger maternity leave, which starts on the
day after the baby’s date of birth therefore the Neonatal Care Leave can be taken after
maternity leave. 
What is the father’s/partner’s entitlement if the baby is born early? 
During the Tier 1 period, it is possible for paternity leave to interrupt neonatal care
leave, in which case the remaining period of Neonatal Care Leave must be taken
immediately after paternity leave (if still in Tier 1 period), or consecutively with any
neonatal care leave in Tier 2 (if Tier 1 period has ended). 
What if my baby is discharged from neonatal care but developed complications
and is readmitted.  Am I entitled to further leave? 
You can accrue Neonatal Care Leave for a new period if the neonatal care stops and
starts, however the second admission still has to be within the first 28 days of birth. 
My baby develops complications and is admitted for the first time more than 28
days after the birth.  Am I entitled to the leave? 
No. Entitlement to Neonatal Care Leave (and pay) state that the baby must start
receiving neonatal care within 28 days of the date of birth. 
What if my baby sadly dies. Am I entitled to the leave? 
Yes, you are still entitled to any accrued Neonatal Care Leave. 
What if I have more than one baby and more than one baby requires neonatal
care.  Am I entitled to further leave? 
No.  For any week in which you have more than one child in neonatal care, you only
accrue one week’s Neonatal Care Leave.  E.g. when twins are both in neonatal care,
there is no double entitlement. 
I wish to curtail my maternity leave to take Neonatal Care Leave.  Is this possible? 
Yes, you can stop your maternity leave to take Neonatal Care Leave however you cannot
then resume maternity leave.  For financial reasons, it is possible that you could ask to
switch to receive neonatal care pay at the end of 39-week period of maternity pay to
receive a further period of pay.  
Page 68 of 276

Page 69

Neonatal Care Leave Policy v1.0   12
Appendix D 
Letter 1 
Dear {Managers Name} 
Request – Tier 2 Statutory Neonatal Care Leave 
I am writing to request Tier 2 Statutory Neonatal Care Leave in accordance with the
Neonatal Care (Leave and Pay) Act 2023 as detailed below : 
1. Employee Name  
2. Employee Number  
3. Child’s Date of Birth/or date of
placement /Entry to UK if adopting  : 
4. Start date or dates of neonatal care 
5. The date neonatal care ended  
6. The date on which I would like to
take the leave (and pay) 
7. The number of weeks of Neonatal
Care Leave (and pay) the notice is
being given for 
8. I confirm that the leave is being
taken to care for my child 
9. I confirm I am eligible to take the
leave due to the relationship with
the child. 
Yours sincerely 
Employee Name 
Page 69 of 276

Page 70

Neonatal Care Leave Policy v1.0   13
Letter 2 
Dear 
Approval of Tier 2 Statutory Neonatal Care Leave 
I acknowledge receipt of your application for Tier 2 Statutory Neonatal Care Leave and
confirm that your application has been approved. 
Should you require any additional support at this time, please do not hesitate to
contact me. 
Yours sincerely 
Managers Name
Job Title 
Page 70 of 276

Page 71

Appendix 3 
Dignity at Work
Policy
Version 2.0, May 2025  
Page 71 of 276

Page 72

Dignity at Work Policy  2
Document control
Title Dignity at Work Policy
Governance group Finance and Resources Committee
Owner Fiona Whittaker, Chief Officer – People
Resources
Contact whittakerf@northlan.gov.uk
Author Tracy Simpson, Employment & Policy Officer Contact simpsontr@northlan.gov.uk 
Revision history
Version Originator Review start
date
Revision description and record of change
2.0 Tracy Simpson July 2024 The addition of new sections that allow for more effective
handling of complaints and encourages employees to
address minor issues informally where appropriate. 
Document approvals
Version Governance group Date approved Date approval to be
requested 
(if document still in draft)
1.0 Policy and Resources (Human
Resources)
18/12/2014 
2.0 Finance and Resources Committee  21/05/2025 
Consultation record 
Consultation status Stakeholders consulted 
Stakeholders
consulted and dates
CMT
Joint Trade Unions representatives
JNCT representatives
People Resources
Employee Equality Forum 
Strategic alignment
Plan for North Lanarkshire
Priority - Improve North Lanarkshire's resource base.
Ambition statement - Build a workforce for the future capable of delivering on our priorities and
shared ambition
Programme of Work 
Statutory / corporate / service requirement 
Next review date
Review Date This policy will be reviewed on a regular basis to ensure it remains fit for
purpose and compliant with all relevant legislation. 
Page 72 of 276

Page 73

Dignity at Work Policy  3
Contents 
1.  Introduction .................................................................................................................................................. 4
2.  Purpose ......................................................................................................................................................... 4
3.  Scope and exclusions .................................................................................................................................. 5
4. Associated Policies and Legislation ............................................................................................................ 5
Council Policies ............................................................................................................................................ 5
Legislation .................................................................................................................................................... 6
5.  Roles and Responsibilities........................................................................................................................... 6
Staff ............................................................................................................................................................... 6
Managers and Line Managers ................................................................................................................... 7
Chief Officers ............................................................................................................................................... 7
People Resources ........................................................................................................................................ 8
Trade Unions ................................................................................................................................................ 8
6.  Sources of Support ...................................................................................................................................... 9
7.  What Constitutes Inappropriate Behaviour? .......................................................................................... 10
Harassment (as defined by the Equality Act 2010) is: .......................................................................... 11
Discrimination ............................................................................................................................................ 12
Victimisation ............................................................................................................................................... 13
Examples of Inappropriate Behaviour ................................................................................................... 13
8.  Procedures .................................................................................................................................................. 14
8.1 What to do when you have experienced inappropriate behaviour? ........................................... 14
8.2 Stage 1 - Informal ................................................................................................................................ 15
8.3 Stage 2 – Formal .................................................................................................................................. 17
Preliminary Review .................................................................................................................................... 17
Investigation Procedure ........................................................................................................................... 18
8.4 What to do when you are the subject of concerns being raised? ................................................ 22
8.5 What happens if you have behaved inappropriately? ................................................................... 23
9.   Toolkits and Further Sources of Information ........................................................................................ 23
10.  Confidentiality and Data Protection ...................................................................................................... 23
11.  Monitoring and Review ........................................................................................................................... 24 
Page 73 of 276

Page 74

Dignity at Work Policy         4
1.  Introduction 
The Council is committed to creating and maintaining a safe, welcoming, and inclusive
environment that nurtures a culture in which we treat one another with courtesy and
professionalism, even while robustly challenging each other’s views and opinions. The
Employee Code of Conduct sets out the key principles that all staff should follow in order to
demonstrate exacting standards of acceptable behaviour. 
There is no place for bullying, harassment*, discrimination, or victimisation in the Council
and each of us is responsible for the way we interact with and treat others, which should
always be with dignity and respect regardless of any protected characteristics, or level,
function, seniority, or status.   
Bullying, harassment, discrimination, and victimisation are referenced collectively
throughout this Policy as “inappropriate behaviour” and wherever this term is used, it
refers to the definitions of these behaviours in Section 7 - What Constitutes Inappropriate
Behaviour? 
* This policy does not apply to concerns or complaints in regard to sexual harassment or
misconduct. Inappropriate behaviour of this nature should be addressed under the
Council’s Sexual Harassment Policy. 
2.  Purpose 
This Policy aims to prevent inappropriate behaviour in the workplace and resolve incidents
of such behaviour if they occur. In support of this aim, this Policy: 
 sets out the roles and responsibilities of all staff (employees and workers) and
behaviours expected to ensure a collective understanding of how everyone should
behave towards one another to foster a healthy and positive working environment 
 ensures that staff are able to disclose inappropriate behaviour if it does occur and
are supported in the process of resolving it 
 promotes the early resolution of inappropriate behaviour wherever possible and
appropriate, to prevent the psychological, health, and work-related problems such
behaviour can cause 
 sets out a clear framework for addressing complaints and refers to what actions can
be taken through the informal and formal resolution processes 
Complaints of inappropriate behaviour, whether by a council employee or worker, a third
party such as a supplier, volunteer, service user, or a member of the public or visitor to the
council, should always be taken seriously.  The purpose of this policy is to provide a
framework that allows action to be taken to stop any inappropriate behaviour identified as
quickly as possible, including the use of disciplinary processes where necessary and where
such behaviour is found to have taken place. 
Page 74 of 276

Page 75

Dignity at Work Policy         5
This policy provides a mechanism for council staff ( employees and workers) to be able to
informally disclose or formally report inappropriate behaviour without fear of repercussions
and trust the processes that are in place to address their concerns. 
This policy also supports the council in its duty to provide a safe environment in which to
work under the Health and Safety at Work Act. Experiencing inappropriate behaviour often
impacts an individual’s physical and mental health and can also affect those who witness it.
The council will not tolerate any act of misconduct towards an individual for raising concerns
in good faith or supporting someone to raise such concerns. 
3.  Scope and exclusions
This policy applies to all staff (employees and workers) of the council and will not
discriminate in respect of, but not restricted to; any protected characteristics, employment
status and position held, political affiliation or trade union membership.     
Any council visitors, volunteers, contractors etc that are engaged in activities related to the
council and/or on council premises are expected to behave in a manner that is consistent
with the Council’s Employee Code of Conduct. 
Any staff that wish to raise a complaint about a *third party should speak to their line
manager in the first instance. In order to address the complaint, it may be necessary to
notify third parties and use their local complaints procedure or notify the police when 
complaints involve members of the public.             
Exclusions: This policy does not apply to *third parties, such as elected officials’ contractors,
suppliers, service users, volunteers, or other members of the public. Any individual who has
a complaint about a council employee or worker will be advised to raise this through the
appropriate complaint’s procedure.     
4. Associated Policies and Legislation 
There are a number of policies, codes and legislative frameworks that are relevant to the
Dignity at Work Policy including but not limited to the following:
Council Policies
• Equality & Diversity in Employment Policy
• Sexual Harassment Policy
• Gender Based Violence Policy
• Grievance Policy
• Grievance Framework for Teachers and Associated Professionals
• Discipline Policy 
• Discipline Framework for Teachers & Associated Professionals
• Employee Code of Conduct
• Disability Policy (this is under development at the moment)   
• Occupational Safety & Wellbeing Policy
• Data Protection Policy Page 75 of 276

Page 76

Dignity at Work Policy         6
Legislation
• Equality Act 2010 (where linked to a protected characteristic) 
• Employment Rights Act 2008
• Protection from Harassment Act 1997
• Public Sector Equality Duty
• Health and Safety at work etc Act 1974.
• Criminal Justice and Public Order Act 1994.
• Human Rights Act 1998.
• Data Protection Act 2018
• General Data Protection Regulation (GDPR)
5.  Roles and Responsibilities 
Everyone has a responsibility to promote a healthy, positive working environment, which
promotes the council’s key principles of the exacting standards of behaviour expected from
everyone and creates a culture of mutual dignity and respect for all. 
Everyone must behave in a way that will not cause offence to others, and to acknowledge
that views and opinions held by others may differ from their own.   
Everyone has a responsibility to bring any concerns about inappropriate behaviours that
are directly or indirectly affecting them to the attention of management. 
Everyone should familiarise themselves with this policy and any associated guidance in
order to increase their understanding and awareness of Dignity at Work and the impact
inappropriate behaviours can have on a person either directly or indirectly in their working
environment. 
Staff
 Contribute to a dignified and respectful working environment where bullying,
harassment, discrimination, and victimisation is not acceptable whilst ensuring their
personal behaviours do not cause offence to colleagues 
 Support colleagues who may be subjected to inappropriate behaviour 
 Take appropriate action if they become aware of any act of inappropriate behaviour by
bringing any concerns to the attention of their line manager. If an employee feels unable
to speak to their line manager, they can also speak to a Dignity at Work Support Officer,
Trade Union representative, the Employment and Policy Team, a representative of an
employee forum e.g. employee equality forum or a colleague where appropriate. 
 Try and resolve any concerns informally and work with their line manager to consider
and discuss solutions to help improve the situation, especially if they feel their
performance is being impacted. 
Page 76 of 276

Page 77

Dignity at Work Policy         7
 Treat everyone with dignity and respect at all times, adhering to the principles of the
Employee Code of Conduct. 
 Make sure any complaints against another employee, are  specific and not general
accusations or feelings.  Any complaints that are found to be malicious,  vexatious (in
law) and/or unreasonably persistent may be considered a disciplinary matter.     
 Encouraged to participate in informal and/or formal meetings to ensure a fair and
robust process for all concerned.   
 To not act unprofessionally or inappropriately towards  another staff member for
bringing a complaint of inappropriate behaviour as doing so may be considered a
disciplinary offence and may be investigated as such.   
Managers and Line Managers 
 Ensure all staff are made aware of this policy, through internal communications and
training, to increase their understanding and awareness of Dignity at Work and the
impact inappropriate behaviours can have on a person either directly or indirectly in their
working environment. 
 Promote a healthy and positive working environment by behaving in a professional
manner at all times and to be aware of how your own behaviour can adversely impact
on staff and potentially be perceived as harassment or bullying depending on the
circumstances. 
 Ensure staff are aware of the standards of behaviour expected of them. 
 Respond quickly and effectively to any complaint of alleged inappropriate behaviour. 
 Offer staff appropriate support when issues relating to Dignity at Work are raised and
try to ensure lines of communication remain open. 
 Approach conversations respectfully and supportively with positive commitment to
understanding people’s concerns. 
 Managers have a responsibility to address attendance, performance or conduct issues,
however any issues must be dealt with in a fair, impartial, and consistent manner.   
 Where a member of staff reports on-going difficulties, or concerns, about their wellbeing
at work a line manager must consider a referral to Occupational Health for further advice
and support. 
Chief Officers
 Ensure the development, implementation and communication of the policy and
supporting frameworks and promote a healthy positive working environment. 
Page 77 of 276

Page 78

Dignity at Work Policy         8 
 Ensure that this policy is shared with all Managers within their service areas and that they
are supported in creating a healthy and positive working  environment. 
 Create and facilitate an environment that encourages Managers and Line Managers to
approach conversations with staff in a supportive and positive manner, treating
everyone with dignity and respect. 
People Resources
 Provide advice and support to staff, Line Manager and Managers on the content and
application of this policy. 
 Promote awareness including training and education for staff and Managers and
Line Managers regarding Dignity at Work and other associated topics.   
 Signpost staff to appropriate support mechanisms that may help them throughout
the process   
 Support the informal and formal process where appropriate including ensuring any
actions required following the outcome of a Dignity at Work investigation are
followed through.     
 Provide information to line managers on when it may appropriate to refer staff to
Occupational Health. 
 Monitor and Report on Dignity at Work cases, as required.  
Trade Unions
 The council recognises the vital role the Trade Unions play in addressing
inappropriate workplace behaviours and members are encouraged to seek support
from their representative regarding their concerns. 
 Support the purpose, aims of this policy, and help create and maintain a safe,
welcoming, and inclusive environment for everyone. 
 Support the implementation of the policy and work with management, HR, and any
other professionals as required. 
 Work with the council in addressing unacceptable and inappropriate behaviours and
ensure that their members are appropriately advised on whether their concerns
should be raised under this policy or not. 
 Support and advise members through the processes related to Dignity at Work
recognising that a positive approach to these matters can help improve the outcomes
for individuals.
Page 78 of 276

Page 79

Dignity at Work Policy         9 
 Participate in and contribute to Dignity at Work training and other related training to
increase knowledge and understanding and work in partnership with management
and HR to undertake reviews of the policy and associated processes to ensure
inappropriate workplace behaviour are appropriately addressed and a supportive and
positive workplace environment is fostered.  
6.  Sources of Support 
The council recognises that whether you are the complainant, the person who the complaint
is against or a witness, the Dignity at Work process can be a difficult and stressful time.  A
number of sources of support are available to both the complainant and the person whom
the complaint is about, as well as anyone else that may be involved in the process.   
Dignity at Work Support Officers
A Dignity at Work Support Officer supports the council in achieving the aims of the policy by
providing confidential support and advice at both the informal and formal stage of a Dignity
at Work complaint, to those who feel that they are experiencing difficult working
relationships including bullying or harassment, have witnessed bullying or harassment or
who have been accused of it.  
There are Dignity at Work Support Officers available across all services and further
information on how to contact a support officer and the support they can and cannot
provide can be found within the Dignity at Work Toolkit. 
Employee Assistance Programme
The Employee Assistance Programme is available to all staff. This is a confidential self-
referral service (Line Managers can refer an employee with their consent). Further
information on the EAP service can be obtained from the myNL portal, Management or
People Resources. 
Education Support Officer (Health & Wellbeing)
The Education Support Officer for Staff Health & Wellbeing can provide confidential  support,
and advice in relation to any workplace issues Teachers may be experiencing. 
Gender Based Violence Support Officers 
Any member of staff that is experiencing or have experienced physical, emotional, or sexual
abuse at any time in their life, which is having an impact on them, can request support from
a Gender Based Violence Support Officer, who are specially trained colleagues within the
council who can provide support. Anyone wishing to seek support can send an email in
confidence to GBVSupportofficers@northlan.gov.uk and one of the support officers will be
in touch. 
Page 79 of 276

Page 80

Dignity at Work Policy         10
Employee Equality Forum (EEF)
The Council’s Employee Equality Forum can provide information and guidance to staff on a
broad range of issues related to diversity and equality in the workplace including disability
and other forms of discrimination. The EEF can be contacted  by emailing
employeeequalityforum@northlan.gov.uk
Trade Union Representatives
Staff are welcome to seek the advice and support of their relevant Trade Union
representative at both the informal and formal stages of a Dignity at Work matter.  At any
informal meetings, the role of a Trade Union representative is there to provide support only.
At formal meetings, the Trade Union Representative can make representations on a staff
members behalf but cannot answer questions for them. 
There is lots of additional information and resources to support your mental wellbeing
during and after this process which you can access on WorkwellNL or obtain from your line
manager, support person or People Resources.     
7.  What Constitutes Inappropriate Behaviour?  
All staff are expected to behave professionally and appropriately and have the right to
expect professional and appropriate behaviour from others. 
“Inappropriate behaviour” for the purposes of this policy means bullying, harassment,
discrimination, and victimisation as defined below. 
It is important to recognise that inappropriate behaviours can be intentional or
unintentional, however such conduct by any individual is unacceptable and all complaints
that may fall under the definition of inappropriate behaviours as detailed below will be
treated seriously.       
When determining whether a matter may constitute a breach of Dignity at Work, a key
factor to be considered is the perception held by the individual who believes they have been
subjected to inappropriate behaviour, and whether it is reasonable for them to hold that
perception. 
Any claims of inappropriate behaviour will be considered to be a  genuine belief of that
individual unless the Dignity at Work process finds that the claims are unsubstantiated,
malicious, or vexatious in nature.     
This policy will not apply where a manager has exercised their responsibilities in directing
staffs work and managing attendance, performance, and/or misconduct in a fair, impartial,
constructive, and consistent manner and in line with relevant council policies.   
As part of the everyday management process managers are required to apply various
council policies, direct the work of their staff, and provide staff with feedback concerning
their performance, e.g. conduct, punctuality, attendance etc. If any of these areas have been
unsatisfactory the feedback may be critical of the person concerned. If criticism is delivered
Page 80 of 276

Page 81

Dignity at Work Policy         11
in a constructive way it can be beneficial to the member of staff providing them with the
opportunity to reflect on their behaviour and make any necessary improvements.
Destructive criticism, on the other hand, can have a  detrimental effect. 
Constructive criticism will focus on: 
• actions and behaviour; focusing on what the staff member has done or not  done
• facts: with specific examples of behaviour that has been inappropriate and  an
explanation of why it was not appropriate
• future improvement: for example, requiring the staff member to do  something
differently or make changes. 
Destructive criticism may involve:
• aggressive behaviour, such as shouting/yelling
• personal insults or put downs
• allocating blame rather than responsibility 
Examples of the distinctions between constructive and destructive behaviours are
contained within the toolkit. 
Bullying (as defined by ACAS) 
There is no legal definition of bullying, however it can be described as “unwanted” behaviour
from a person or group that is: 
‘Offensive, intimidating, malicious or insulting or, an abuse or misuse of power
through means that undermine, humiliate, denigrate or injure the recipient.’  
Bullying can happen by a manager or supervisor bullying a team member; team members
bullying each other, or an individual or group of staff bullying a supervisor or manager. The
behaviour may relate to one incident or be persistent. 
Harassment (as defined by the Equality Act 2010) is:
“Unwanted conduct related to a relevant protected characteristic, which has the purpose
or effect of violating an individual’s dignity or creating an intimidating, hostile, degrading,
humiliating, or offensive environment for that individual.” 
It may be an isolated incident or persistent behaviour, deliberate or unintentional, and/or
explicit or implicit but as it is considered offensive / unwelcome / uninvited by the recipient,
it acts in such a way as to humiliate, ridicule, or cause embarrassment. 
Legislation prohibits three types of harassment:– 
• harassment related to a relevant protected characteristic (see definition of
discrimination for list of protected characteristics).  Pregnancy and maternity and
marriage and civil partnership are not protected directly under harassment provisions
but are protected indirectly under other characteristics.  
• sexual harassment (see the sexual harassment policy for more information)
Page 81 of 276

Page 82

Dignity at Work Policy         12
• less favourable treatment of an individual because they submit to, or reject, sexual
harassment or harassment related to sex or gender reassignment 
Harassment by association means that individuals are protected if they are subjected to
unwanted conduct because of their association with someone who has a protected
characteristic. 
Harassment by perception means that individuals are protected if they are subjected to
unwanted conduct by others who wrongly perceive that individual has a protected
characteristic. 
For the purposes of this Policy, harassment will also include conduct of a similar nature
which is not related to a protected characteristic.
Discrimination 
Discrimination law (Equality Act 2010) protects people against discrimination at work.
Discrimination means treating someone 'less favourably' than someone else, because of
their protected characteristic. These are as follows:
 age
 disability
 gender reassignment
 marriage and civil partnership
 pregnancy and maternity
 race
 religion or belief
 sex
 sexual orientation
Less favourable treatment can be anything that puts someone with a protected
characteristic at a disadvantage, compared to someone who does not have that
characteristic.
It can still be discrimination even if the less favourable treatment was not intended.
Discrimination includes:
• direct discrimination – less favourable treatment directly because of a protected
characteristic
• indirect discrimination – when everyone is treated the same but people with a
protected characteristic are put at a disadvantage
• harassment – unwanted or offensive behaviour related to a protected characteristic
• victimisation – negative treatment as a result of being involved with a discrimination
or harassment complaint 
Page 82 of 276

Page 83

Dignity at Work Policy         13
Victimisation
Victimisation is where an individual perceives they receive less favourable treatment than
other individuals.   However to be unlawful, victimisation must be linked to a protected act. 
Examples of a protected act are:- 
• bringing proceedings under the Equality Act 2010 
• giving evidence or information in connection with proceedings brought under the
Act 
• doing anything which is related to the provisions of the Act 
• making an allegation (whether or not express) that another person has done
something in breach of the Act. 
An employee need not have a particular protected characteristic in order to be protected
against victimisation. For the purposes of this policy, victimisation will also apply where an
individual is subject to less favourable treatment because they have made a complaint or
intend to make a complaint about being bullied or harassed or act as a witness in this
regard.
It should be noted that the above forms of inappropriate behaviour do not just apply to
those working in an office but also apply to virtual platforms, sites, or other locations where
staff are conducting council business, including those working from home.
Examples of Inappropriate Behaviour
Whether intentional or not, any form of inappropriate behaviour will not be tolerated, and
all complaints will be treated seriously. Examples of what may constitute inappropriate
behaviour are:
 Spreading malicious rumours, or insulting someone (particularly on the grounds of
age, race, sex, disability, sexual orientation, religion or belief, gender reassignment,
marriage and civil partnership, pregnancy, and maternity).
 Copying emails that are critical about someone to others who do not need to know.
 Ridiculing or demeaning someone i.e. picking on them or setting them up to fail.
 Unfair treatment.
 Overbearing supervision or other misuse of power or position.
 Unwelcome sexual advances – touching, standing too close, display of offensive
materials: including signs, pin ups and calendars.
 Making threats or comments about job security without foundation.
 Deliberately undermining a competent worker by overloading and constant criticism
 Preventing individuals progressing by intentionally blocking promotion or training
opportunities.
 Jokes, banter, emails, or deliberate abuse directed at a person or group.
 Deliberately imposing grossly excessive or unachievable workloads or impossible
deadlines in order to make life difficult for a particular employee. 
 Repeated unfair criticism or destructive and negative criticism that focuses on blame
rather than future improvement. 
 Criticising individuals in front of colleagues.
Page 83 of 276

Page 84

Dignity at Work Policy         14
 Excessive or overbearing monitoring of a particular employee’s work without good
reason. 
 Ordering a particular employee to work below his or her level of ability, or to perform
mundane demeaning tasks, with no proper reason. 
 Removing an employee’s responsibility without consultation and for no proper
reason. 
 Threatening an employee with dismissal. 
Whilst the list of above examples is not exhaustive, it is representative of many types of
behaviour that others may object to and find offensive which could create an intimidating
working environment. 
As noted above fair, impartial, and consistent management of employees is not bullying or
harassment. Managers are expected to lead and manage employees which involves setting
and making sure employees understand performance standards. Legitimate, constructive,
and fair criticism of an employee’s work performance or behaviour either informally or 
formally is not bullying.
8.  Procedures 
8.1 What to do when you have experienced inappropriate behaviour?
An individual who believes they have not been treated with dignity and respect, taking 
Section 7 of this policy into account, can take action by using the informal and/or formal
procedures outlined below. 
Before entering into the Dignity at Work process the individual should take some *time to
consider, using the self-reflection tool, and taking Section 7 of this policy into account,
whether the behaviours they have experienced meet the definition of “inappropriate
behaviour” and if so, think about what outcome they would seek to achieve in respect of
their complaint. Individuals must be realistic about their desired outcomes and not
withstanding or acknowledging how an individual feels they may not achieve the outcome
they wish for 
*unless the behaviour they have been subjected to is so obvious or serious in nature that
there is doubt it meets the definition of “inappropriate behaviour.   
Staff are encouraged to take responsibility for addressing their own concerns in relation to
inappropriate behaviour in the workplace.  The best way to resolve the issue at the earliest
opportunity is by ensuring the other party is aware of the impact of their behaviour.  Early
resolution in regard to Dignity at Work concerns helps to prevent possible issues escalating.
It is essential to stop any inappropriate behaviour occurring or being repeated to minimise
anxiety for the staff concerned. 
Therefore, if you have concerns relating to your dignity at work, you have a responsibility
to work towards an early resolution of your concerns. Where possible, staff who are
subjected to a breach of their dignity at work should make every reasonable effort to
resolve this informally using the procedures outlined below.
Page 84 of 276

Page 85

Dignity at Work Policy         15 
Staff should keep notes and diary records of any incidents which they perceive contribute
to the situation and note the presence of any witnesses. This will assist any subsequent
investigations should an informal resolution not be achieved.     
Staff are encouraged to seek support from one of the sources noted at Section 6 above to
ensure that they are appropriately supported throughout the process, both at the informal
and formal stages. 
There are two stages of the process (informal and formal) available to staff, as outlined
below. The informal stage has three different approaches that can be considered.  Whilst
encouraged to do so, staff do not have to take an informal approach before proceeding to
the formal stage, nor do they have to use every step of the informal process.    
8.2 Stage 1 - Informal 
The use of the informal process can achieve more positive outcomes particularly where the
behaviour relates to a one-off incident or more minor incidents of inappropriate behaviour.   
Informal approaches have been found to be the most effective way of resolving conflict,
tackling inappropriate behaviour, and minimising any negative impact on the individuals
involved. 
There will obviously be circumstances where the informal  approach is not appropriate, and
it may be determined by management that either a formal Dignity at Work process or a
Disciplinary investigation will be instigated, regardless of whether the complainant wishes
to pursue this or not.     
Step 1 – Direct Individual action (without support) 
The individual raising the complaint should try to approach the individual causing them
concern directly or write to them, and let that person know in a constructive way what
inappropriate behaviours they believe that they have demonstrated towards them
(providing specific examples), explain how these behaviours have made them feel, and
what the individual feels would resolve the issue in order to achieve a resolution.    
It should be acknowledged that the individual whose behaviour has caused the distress
may be unaware that they have acted in such a way that another individual finds it
unacceptable, and the matters being raised may be difficult to hear. None the less the
individual who is the subject of the complaint must respond appropriately and
professionally to any concerns raised with them.   
Step 2 – Direct Individual Action (with Support)
An individual may wish to pursue an informal resolution but, understandably, feel unable or
reluctant to directly meet with the other individual on their own. Step 2 of the informal
process allows the individual to seek support in order to try and achieve an informal
resolution. 
Support can be requested from: 
Page 85 of 276

Page 86

Dignity at Work Policy         16
• Line manager (or equivalent if the complaint is against the line manager)
• Dignity at Work Support Officer 
As part of this process, the supporting person can attend a meeting between all parties to
help them discuss what has happened and support a constructive discussion that will
hopefully allow the individuals to achieve a positive resolution. However the individual
raising the concerns would be the one to initiate  contact with the other party/parties in the
first instance.   
Any discussion should again let that person know in a constructive way what inappropriate
behaviours they believe that they have demonstrated towards them (providing specific
examples), explain how these behaviours have made them feel, and what the individual feels
would resolve the issue in order to achieve a resolution.  The discussion should focus on the
working relationship and trying to ensure that this is not negatively impacted on moving
forward. 
Whilst the individual whom the complaint is against is under no obligation to attend such a
meeting, the council would expect staff to take all reasonable steps to try and resolve any
workplace issues that may impact on maintaining a professional and positive working
relationship with colleagues.     
Step 3 –Facilitated Discussion and Mediation
Before an individual decides to proceed with a formal complaint and depending on the
nature of the concerns, or where the other informal approaches have failed a more
structured discussion involving all parties may be the appropriate way to deal with the
matter. 
Facilitated Discussion
This discussion will be facilitated by an impartial manager, who will initially meet with all
parties individually and then together, where they can discuss the concerns and hopefully
find a way forward. 
The facilitator will not take sides, impose solutions, or make judgements. They will set
ground rules, ensure all parties are heard, listen, ask questions, summarise the discussion
and the desired resolution, and try to help all parties achieve a positive outcome. 
Mediation
Depending on the nature of the complaint and what parties are involved it may be
appropriate to consider an external mediation service. This process is for resolving issues
between individuals and will involve one or two third party mediators helping those
involved find and agree their own solutions.
As with the facilitated discussion the mediator/s would meet separately with all parties and
then together, if they considered it appropriate in the circumstances ,and if they in their
experience believed an informal resolution could be achieved.    
Page 86 of 276

Page 87

Dignity at Work Policy         17
Right to be Accompanied
Whilst there is no legal right to be accompanied at a facilitated discussion or mediation,
individuals may bring an appropriate companion i.e trade union representative, dignity at
work support officer, colleague, as long as all parties agree to this.  
Requests for Facilitated Discussion or Mediation 
If an individual wishes to engage in either a facilitated discussion or mediation they must
request this through their line manager (or other manager) or the Employment & Policy
Team to ensure this is the most appropriate step to take in the circumstances.  
It should be noted that participation in both facilitated discussions and mediation are
voluntary, confidential and either party can withdraw from the process at any time. No
member of staff is required to use mediation or facilitated discussions before pursuing a
formal complaint. 
8.3 Stage 2 – Formal
There will be times where an informal resolution has not been successful or is simply not
appropriate due to the nature of the complaint.  In these situations the individual
experiencing the inappropriate behaviours should raise a formal complaint. 
In such circumstances the complaint must be submitted in writing (Appendix A – Dignity at
Work Complaints Form can be used)  specifying the basis of the complaint, to the
appropriate Chief Officer (normally the Chief Officer from the same Service as the
complainant). 
The Chief Officer will appoint a Nominated Officer (depending on the level of seniority of the
parties involved, the Chief Officer may consider the complaint) to consider the complaint.
Preliminary Review  
As previously referenced a Dignity at Work complaint must contain specific incidents/events,
that the individual feels have demonstrated inappropriate behaviour/s towards them, in
accordance with the definitions of “inappropriate behaviour” as detailed at Section 7, above. 
Before the commencement of any formal investigation the complaint will be reviewed by 
the Employment & Policy Team to ascertain whether each aspect of the complaint falls within
the scope of the Dignity at Work Policy and whether any specific matters require to be raised
under a different policy e.g.  grievance, sexual harassment.   
This preliminary review is not intended to establish whether the behaviour actually occurred,
but to ensure that all aspects of the complaint fall within the definition of inappropriate
behaviour. This will be a paper-based review and there are no meetings with any parties to
the complaint or witnesses. 
Page 87 of 276

Page 88

Dignity at Work Policy         18
Following the preliminary review of the complaint the Nominated Officer or Chief Officer will
write to the individual that raised the complaint to advise them of the outcome of the initial
review and confirm whether any (or all) aspects of the complaint will be excluded from the
scope of the investigation and why and advise on any alternative mechanisms available to
the individual to address some or all aspects of the complaint.
Investigation Procedure 
The main purpose of the formal investigation is to determine whether, on the balance of
probabilities, the behaviour complained of has taken place and whether this amounts to
“inappropriate behaviour” as defined by this policy.  Where the investigation and subsequent
review by the relevant Chief Officer determines that there has been conduct in breach of
this policy appropriate action will be taken e.g. disciplinary investigation.         
Once the preliminary review has determined that an investigation is required the Nominated
Officer will then appoint appropriate officers (normally a minimum of two) to conduct a
thorough and impartial investigation. In appointing the investigating officer consideration
will be given to the composition of the officers in light of the circumstances of the
investigation, i.e. considering the parties involved and relevant equality strands.  The
investigating officers will normally be drawn from out with the immediate section of the
person(s) involved but if required  from out with the service. 
The Employment & Policy Team will provide advice and guidance to the investigating officers
on the application of the policy and depending on the circumstances of the complaint a
representative of the Employment & Policy Team may assume the role of investigating
officer, however, will never be the Lead Officer. 
Notice of Investigation
All parties to the complaint will be advised in writing of the commencement of the formal
investigation, and at an appropriate point in the process be asked to attend an investigation
meeting to discuss the complaint.   
In all cases, the individuals concerned will be treated sensitively, with confidentiality being
maintained at all times. This is subject to the right of the individual who is the subject of the
complaint being able to access information relevant to the complaint and having the
opportunity to respond to the claims.   
The individual raising the complaint must also be aware that if, after investigation, the
complaint is found to be malicious, vexatious, or unreasonably persistent then they may be
subject to disciplinary action. 
If the complaint made is serious, a manager may choose to initiate an investigation and take
the matter through the Council’s Discipline Policy, even if the employee has chosen not to
use the formal procedure in the Dignity at Work Policy. 
Page 88 of 276

Page 89

Dignity at Work Policy         19 
Timescale of Investigation
An investigation into a formal complaint through the Dignity at Work Policy should be
completed as quickly as possible, without any unnecessary or unreasonable delays. The
timescale for completion will be dependent on the extent and complexity of the
investigation, the sensitivity of the matter being investigated and the number and availability
of witnesses involved. Annual Leave and other leave also need to be factored into the
timescale.   
At the start of the investigation, both parties will be advised how long the investigation is
likely to take and the name of the Lead Investigating Officer undertaking the investigation.
The Lead Investigating Officer will keep both parties informed if the indicative timescale will
not be met, advising both parties of an anticipated revised completion date, and giving
reasons for the revised timescale. These updates should be provided throughout the
duration of the process.     
Investigation Meetings
The investigating officers will write to the individual under investigation, the complainant,
and any relevant witnesses to invite them to attend an investigation meeting to obtain
statements in support of the complaint. 
It will be for the investigating officers to determine who to interview and in what order.
Depending on the information that is provided by each individual follow up investigation
meetings may be required.     
The individual that is the subject of the formal investigation will be provided with an outline
of the complaint before the meeting to ensure they have sufficient information as to why
the investigation is taking place before the meeting is held.         
Witnesses
Witnesses should be advised of their right to representation prior to being asked for
information, and informed that any statement or information gathered may be used in
formal meetings and may be given to the employee against whom the complaint has been
made. 
If a witness is asked to provide evidence as a part of the investigatory process they must
comply with this request. Failure to do so may lead to disciplinary action being taken against
them. 
Right to be Accompanied
Whilst there is no legal right to be accompanied at an investigation meeting individuals
(including witnesses) may bring an appropriate companion i.e trade union representative,
dignity at work support officer, or colleague.  
Page 89 of 276

Page 90

Dignity at Work Policy         20
Investigation Report
Following the investigation a report will be submitted to the Nominated Officer by the Lead
Investigating Officer. The report will contain the details of the complaint, the findings of the
investigation meetings, and conclusions/recommendations for the Nominated Officer to
consider. 
Investigation Outcome 
Following receipt of the investigation report the Nominated Officer will decide whether the
complaint is upheld, not upheld, or upheld in part and write to all parties, informing them
of the outcome. Whilst the outcome should be issued within 14 days, there may be
occasions where the Nominated Officer requires clarification or further information in
order to make an informed decision. Individuals to the complaint will be notified of any
delays to this timescale.   
Where the outcome of the investigation results in specific action, including disciplinary
action, requiring to be taken against the individual who is the subject of the complaint the
Employment & Policy Team will assist the service/managers in ensuring this is
instigated/applied, as appropriate
Complaints which are upheld/upheld in part 
The appropriate action taken in any case will be dependent on all of the circumstances of
the case and the individuals involved.  An objective decision should be made on whether
inappropriate behaviour has likely taken place having considered the findings of the
investigating  officers  It is not possible to provide the definitive course of action to be
adopted in each case.  As a general guide, the Nominated Officer should consider one or
more of the following potential outcomes:
 On the balance of probabilities there is a case to answer and therefore disciplinary
action is appropriate regarding the person whom the complaint was against. 
 Both parties partially responsible therefore recommend support through training,
and/or mediation.
 Complainant raised a malicious/vexatious/unreasonably persistent claim and therefore
should be subject to disciplinary proceedings.
 Redeployment is required on the grounds of breakdown in the working relationship. 
In situations where relocation or transfer of the employee who is the subject of the
complaint, takes place after a complaint is upheld, consideration may also be given to
relocation of the complainant if circumstances determine that relocation may be in their
best interests, and if agreed by the complainant.  This may be progressed if appropriate
and practicable.   
Complaints which are not upheld 
Where, having considered the findings of the investigation panel, the Nominated Officer
decides that there is no case to answer and no further action is required, they will advise
Page 90 of 276

Page 91

Dignity at Work Policy         21
both parties in writing of this and provide a right of appeal to the individual that made the
complaint.  
Malicious, Vexatious or Unreasonably Persistent Complaints  
A malicious complaint is one that is made with the intention to intimidate, to lower the
reputation of, or otherwise injure or harm a colleague or manager, through knowingly
providing false, misleading information, or withholding information about an incident or
issue. 
A vexatious complaint is one made without sufficient grounds, especially so as to
cause annoyance or embarrassment to the subject, and/or one that is unreasonable,
frivolous, repetitive, deliberately burdensome or unwarranted. 
An unreasonably persistent complaint in relation to Dignity to Work would be one were an
individual continues to submit complaints which appear to have no substance, or which have
already been investigated and an outcome determined. 
If it is found that an individual has made a complaint that is considered to be malicious or
vexatious (in law), or unreasonably persistent,  the council may instigate a disciplinary
process against them. 
Disciplinary action will not be taken, however, where it is considered that a complaint is
unsubstantiated or out with the scope of what is considered to be inappropriate behaviour
as defined in this policy.   
Further guidance on the investigation procedure is contained in the Dignity at Work Toolkit. 
Right of Appeal 
If, following the investigation, the complainant is unhappy with the decision not to uphold
a formal complaint, or uphold it only in part, they will have the opportunity to exercise their
one right of appeal against the decision, which will be considered at Service level. 
In such circumstances the employee should write to their Chief Officer (or Depute Chief
Executive where the initial complaint has been considered by the Chief Officer) within 14
days of receiving the decision of the Nominated Officer, detailing the reasons why they are
dissatisfied.  In general an appeal may be submitted where: 
The complainant has not received enough information about the findings of the
investigation. 
• The complainant disagrees with the findings of the investigation. 
• The complainant feels that procedural errors occurred in the investigation. 
The Chief Officer will acknowledge receipt of the appeal letter, in writing, within 14 days of
receiving it. 
The appeal process will not re-investigate the original complaint.  The appeal will consider
whether the outcome of the original investigation was conducted in a comprehensive and
Page 91 of 276

Page 92

Dignity at Work Policy         22
thorough manner, and the conclusions reached were logical and based on all available
evidence.  The appeal will consider: 
• Were the findings appropriate and based on evidence?  Was any evidence missed? 
• Was the information supplied to the employee sufficient to allow them to
understand the outcome and the reasons why? 
When an appeal letter has been received, the Chief Officer will nominate a Senior Officer to
conduct an independent, paper-based review of the findings, with a representative from
the Employment & Policy Team.  The review will be undertaken as quickly as possible,
without any unnecessary or unreasonable delays.  Any unexpected delays will be
communicated in writing to the individual concerned.   
The Nominated Senior Officer will make recommendations following their review and pass
these back to the Chief Officer for consideration.  The Chief Officer will then confirm in
writing to the complainant the outcome of the appeal.  Whilst the outcome of the appeal
should be issued within 14 days, there may be occasions where the Chief Officer requires
clarification or further information in order to make an informed decision. Individuals to
the complaint will be notified of any delays to this timescale.   
There is no further right of appeal under this policy. 
8.4 What to do when you are the subject of concerns being raised? 
It can be a disconcerting and upsetting experience for an individual to be approached and
told that their behaviour could be construed as inappropriate. If this is done through an
informal process, they should be prepared to listen patiently and calmly and allow the
member of staff (or the person supporting them in the process) to express their concerns.
If it is possible, they should also try to remedy the situation and allow a positive working
relationship to be resumed. The individual should keep a note of what was discussed and,
if appropriate, agreed. 
The individual who is the subject of the complaint should also be able to give an account of
what happened as part of any informal and formal resolution processes. They can speak
with any of the following for general guidance or to discuss any specific questions about
the resolution process: 
• their line manager (or equivalent) 
• a member of the employment & policy team 
• a Dignity at Work Support Officer
• a trade union representative. 
The support services set out in Section 6 are also available to provide support for individuals
who are the subject of a complaint. 
Page 92 of 276

Page 93

Dignity at Work Policy         23
8.5 What happens if you have behaved inappropriately?
While this policy emphasises the value of an early, informal resolution process, there will
be situations that can only be resolved through a formal process. Where a formal complaint,
complaints or concerns is brought and upheld against an individual and the nature of the
inappropriate behaviour warrants it, a separate procedure under the relevant disciplinary
policy will be undertaken. This may result in a formal warning being issued to the individual
demonstrating the inappropriate behaviour and training or other interventions may also
be recommended. In the case of serious or sustained misconduct, the procedure may result
in the termination of employment. 
Additionally, where a manager has become aware of multiple concerns or complaints of
inappropriate behaviour in their area, which may not have been formally reported but give
rise to sufficient cause for concern, they may choose to conduct a fact-finding investigation
to understand the alleged behaviours in more detail and to determine if support and
interventions are needed or whether a formal investigation is required under the relevant
Disciplinary process.
9.   Toolkits and Further Sources of Information  
This policy will be supported by guidance and information toolkits for Managers and Staff
which are available on the myNL portal. The council will ensure that staff that do not have
ready access to online resources will still be able to access the toolkits by other means. 
10.  Confidentiality and Data Protection
Confidentiality 
To protect the integrity of the process and those individuals who are either the complainant,
the subject of the complaint or a witness, it is vital that confidentiality is maintained by
everyone involved in the process at all times.  The Employee Code of Conduct sets out the
standards required in respect of privacy and confidentially. 
However in terms of Dignity at Work it has to be recognised, that in some cases it may not
always be possible to preserve total confidentiality, for instance, 
• An individual is at serious and urgent risk of harm, abuse, or neglect.
• An individual actions may have caused or are likely to cause harm to someone else.
• An individual actions may have an adverse effect on the work or reputation of North
Lanarkshire Council.
• A serious crime may have been committed or reporting your concern could prevent
a crime and such the police would need to be informed. 
• The matters raised or actions of an individual require to be reported to a third-party
e.g. SSSC, GTC, Health & Safety Executive. 
Page 93 of 276

Page 94

Dignity at Work Policy         24
If, in such a situation, the council can no longer preserve total confidentiality, the individuals
concerned will be advised of that fact and the reason why. Further advice can be sought
from the Employment & Policy Team. 
Data Protection  
Dignity at Work complaints will most often contain sensitive and personal information and
therefore it is imperative that all those involved in the process adhere to the requirements
of the Council’s Data Protection Policy.   
Anyone involved in the Dignity at Work process that will be handling sensitive and personal
information must ensure this is collected, processed, and stored  securely and responsibly.
This includes destroying information safely when it is no longer required in accordance with
the Council’s retention schedule. 
Advise on what information should be retained by those involved, and for how long,
following the formal Dignity at Work process, can be obtained from the Employment & Policy
Team.   
11.  Monitoring and Review
The Employment and Policy Team as key stakeholders oversee the review and consider the
contents before referring it on for approval. The Chief Officer of People Resources – is
accountable for its governance. 
The Employment and Policy Team is responsible for the following activities. 
1. Produce, publish, and promote this policy.
a. Write it in a way that is easy to read and understand.
b. Consult with relevant stakeholders on its content and implications.
c. Make sure all users can access it. 
2. Give guidance on how to apply and comply with this policy through standards, toolkits
and guidance, legislation and regulations and other related policies and procedures. 
3. Review and report on this policy.
a. Review as a minimum every 3 years or with other reviews when needed. For
example, following new legislation, new external or internal strategies/plans, to
align with best practice. 
b. Report to management teams, governance and working groups, committees, and
scrutiny panels.
Page 94 of 276

Page 95

Dignity at Work Policy         25
Appendix A 
DIGNITY AT WORK  - FORMAL
COMPLAINT FORM 
PERSONAL DETAILS 
Name   Section 
Email   Grade 
Designation   Tel No. 
Work Location   Employee No. 
Home Address: 
Informal Action Taken  - Yes/No 
Please advise in detail what informal action has been taken so far and the outcome of these (if
no informal action has been taken, please complete the rest of this form with and discuss with
your line manager or other appropriate person):
Examples of action taken
• Informal discussion with person involved
• Supported Discussion
• Mediation
• Advice from Dignity at Work Support Officers 
Page 95 of 276

Page 96

Dignity at Work Policy         26 
DETAILS OF WHO YOUR COMPLAINT IS AGAINST 
Name   Section 
Designation   Work Location 
NATURE OF COMPLAINT (please include specific details of incidents, including
dates, times, and any witnesses)   
Page 96 of 276

Page 97

Dignity at Work Policy         27 
Page 97 of 276

Page 98

Dignity at Work Policy         28 
Please indicate how, in your opinion, this could be resolved: 
Signed _________________________________       Date ____________________ 
For Employment & Policy Team only 
Preliminary Review  
Proceed/Proceed in Part/Do not proceed with Formal Investigation (delete as appropriate) 
REASON/S 
Page 98 of 276

Page 99

Dignity at Work Policy         29 
Signed ………………………………………………... Date ……………………………………… 
The individual who has raised the complaint must be notified in writing of the outcome of the
preliminary review.   
Page 99 of 276

Page 100

Appendix 4 
Acting Up and Higher Duties for Single Status Employees
1
Acting Up and
Higher Duties
for Single Status
Employees
Version 1
April 2025 
Contents
Page 100 of 276

Page 101

Acting Up and Higher Duties for Single Status Employees
2
1.     Introduction
2.     Scope
3.     Definitions
4. When it is appropriate to use Acting up or Higher  
Duties
5.     Duration of cover required
6.     Determining the percentage of duties 
7.     Payment and Salary Placing
8.     Stand-in Arrangements
9.     Selection Process
10. Appointment to Permanent Post
11. Equal Opportunities and Review 
Page 101 of 276

Page 102

Acting Up and Higher Duties for Single Status Employees
3
1.  Introduction
As part of our commitment to developing a workforce for the future, North Lanarkshire
Council recognises the significance of providing opportunities for employees to
temporarily act up to a higher graded post or to undertake additional higher duties.  Whilst
the business needs of the Council will always be the primary focus of any resourcing
decisions, we recognise that promoting the development and capabilities of the workforce
by giving them experience beyond their substantive job role can be beneficial in building
our capacity.
The provisions around acting up and undertaking higher duties are currently detailed
within the Council’s Core Conditions of Service and these will continue to apply.
2.  Scope
This guidance applies to all employees of the Council who hold a permanent or temporary
contract with the Council (except those employed under SNCT (Scottish Negotiating
Committee for Teacher) Terms and Conditions for whom separate arrangements apply. 
Casual Workers and Trainees are not eligible for acting up or higher duties payments,
however there may be occasions when it is appropriate for Modern Apprentices to be
given an opportunity to act up or undertake higher duties for a limited period of time.
Managers who ask an individual to act on their behalf during short periods of absence
such as sickness, annual leave or attending a conference, by giving them the authority to
authorise annual leave, invoices, manage sickness absence etc, do not qualify for acting
up or higher duties payments.  This is classed as delegated authority which is distinct
from acting up or higher duties and does not attract any allowance.
Acting Up and higher duties payments are not intended to be applied on a permanent
basis.  Where changes to an employee’s duties are required on a permanent basis,
discussion should take place with the relevant HR Business Partner team and the
provisions of the Job Re-evaluation Procedure considered. 
3.  Definitions 
Acting Up (Applies for Vacant Posts only)
Acting up is when an employee temporarily takes on the full or majority of the duties of
a vacant post that is graded higher than their substantive post.  On most occasions,
employees will assume 100% of the duties of the vacant post, however there may be
situations where a lesser percentage will be required (ie the person is not qualified to do
the full remit of the post).  If the requirement for cover is less than 80% of the duties of
the post, higher duties arrangements as outlined below should be applied. 
Page 102 of 276

Page 103

Acting Up and Higher Duties for Single Status Employees
4
Acting up should only be used when it has been established that a post will be vacant for
a significant period of time.  Managers must ensure that all acting up arrangements are
discussed and agreed with the Service HR Business Partner before proceeding.
Higher Duties 
Higher duties apply to employees who are required to undertake higher level duties in
addition to those of their substantive post for a temporary period of time for business
requirements.  These duties will be at a demonstratively higher level of complexity than
those of the employee’s substantive grade duties and will be assigned to a job role
evaluated at a higher grade.  Higher duties are normally not paid at 100% however there
may be circumstances where this is necessary, such as short notice cover that is only
required for a limited period of time.
Higher duties can also be approved if there is a need for a specific function of work and/or
task to be undertaken, the nature of which is determined as being at a higher level of
complexity than the employee’s substantive duties.  Any decision to apply a higher duties
payment in such circumstances must be discussed and agreed with the Service HR
Business Partner in the first instance.
4. When is it appropriate to use Acting Up or Higher
Duties?
The opportunity to act up or undertake higher duties may be the result of one of the
following:
• the permanent employee is on long term secondment.
• awaiting a vacant post being advertised and filled.
• cover of a long-term sickness absence or maternity leave
• awaiting the conclusion of a structural review
• requirement to ensure continuity of service delivery (mainly front line)
• undertaking a project or planned employee development exercise not related
to an established position but associated with a short-term business need.
In determining requirements for acting up or higher duties payment, the manager should
consider in conjunction with their Service Business Partner, the following:
• the length of time that the post will be vacant 
• how long higher duties will be required
• the nature of the duties requiring to be undertaken
• can the duties be assumed by peers or supervisors
• impact on team members
• employee management responsibilities of the role
• impact on budget and/or Council reputation
• specialised knowledge requirements
Page 103 of 276

Page 104

Acting Up and Higher Duties for Single Status Employees
5
Acting up and higher duties payments should not be applied if the impact of any absence
will be minimal.  
5.  Duration of Cover Required
In the normal course of events acting up or higher duties should not continue beyond
twelve months, and if it becomes apparent that the requirement will continue longer than
this, full consideration should be given to appointing the employee covering the post on
a temporary basis.
However, there will be circumstances when it is appropriate for an employee to act up or
undertake higher duties beyond twelve months, and this must be fully discussed and
agreed by the relevant Chief Officer and Service HR Business Partner.  
Agreement for extension of Acting up/Higher Duties beyond 12 months is required from
the Workforce Change Steering Group.
There may also be specific business arrangements in place to ensure the continuity of
front-line services which do not have a time limit.  These arrangements will normally be
agreed and applied through a local collective agreement.
6. Determining the Percentage of Duties 
To establish the percentage of duties an employee is undertaking of a higher graded
post,  the job description of the higher graded post should be used, as far as possible, 
to identify the actual duties that the employee will be undertaking, taking into
consideration any duties that the employee will continue to undertake in their own
substantive role.  Further guidance relating to this is attached at Appendix 1. 
Where there are any concerns over the percentage of duties that an employee will be
undertaking, this should be discussed with the Service HR Business Partner in advance.
7.  Payment and Salary Placing 
Acting Up
Employees who are acting up, will be paid the difference between their current salary and
the placing on the scale for the higher graded post at the percentage that has been
agreed by the manager and Service HR Business Partner (in most cases this should be
100%).  The placing on the higher salary scale, will be determined using the promotional
rule i.e. they require to be placed on the first point of the salary scale of the higher graded
post,  which ensures an increase in remuneration of at least an amount equal to the
smallest incremental difference on the salary scale of the higher graded post.  
Payment will be made from the commencement date of the acting up, however
employees will not be paid the higher-grade during periods of leave.   
Page 104 of 276

Page 105

Acting Up and Higher Duties for Single Status Employees
6
Overtime when Acting Up
Overtime should be avoided where possible during periods of acting up.  However, if an
employee is required to work overtime whilst undertaking the duties of the post to which
they are acting up and they have worked the qualifying hours of 37 hrs per week, a
calculation should be undertaken that allows for the difference between the enhanced
rate in the higher graded post, minus the enhanced hourly rate that would have been
received in the substantive post based on the percentage of acting up that the employee
is doing. 
Returning to Acting Up after a Short Period of Time
Where an employee has been asked to return to an acting up position with a 12-week
period to a post that has the same job title, grade and responsibilities, they should be
placed on the same point on the higher salary grade that they were on before the
arrangement came to an end.
Higher Duties
Employees who are undertaking higher duties, will be paid the difference between their
current salary and the placing on the scale for the higher graded post at the percentage
that has been agreed by the manager and Service HR Business Partner (in most cases this
should be 80% or less).  
The placing on the higher salary scale, will be determined using the promotion rule i.e.
placed on the first point of the scale of the higher grade which ensures an increase in
remuneration of at least an amount equal to the smallest incremental difference on the
salary scale of the higher graded post.  
Payment for undertaking higher duties will be paid from the commencement of the
arrangement, however employees will not be paid for undertaking higher duties during
periods of leave. 
Overtime when Undertaking Higher Duties
Employees who are undertaking higher duties should not be required to work overtime
to undertake the duties and responsibilities of a higher grade unless there are
exceptional circumstances that have been fully agreed with the relevant Service HR
Business Partner. 
If an employee is required to work overtime whilst undertaking higher duties, as long as
they have worked the qualifying hours of 37 per week, a calculation should be undertaken
Page 105 of 276

Page 106

Acting Up and Higher Duties for Single Status Employees
7
that allows for the difference between the enhanced rate in the higher graded post,
minus the enhanced hourly rate that would have been received in the substantive post,
both calculated at the percentage of higher duties the employee is undertaking. 
Incremental Progression 
Where ‘cost of living’ pay awards and/or incremental progression occurs during the
period of Acting Up/Higher Duties, amounts will be re-calculated reflecting the relevant
formula as outlined above. 
These will be implemented in line with the existing Council Core Conditions of 1 April or
after 6 months if Acting Up /Higher Duties commences between October and March. 
Processing of Payment
Acting up and higher duties payments will be processed by the Employee Service Centre
via the Service HR Business Partner teams and therefore it is the responsibility of the line
manager to liaise with the relevant member of the HR Business Partner team in a timely
manner concerning any proposed changes to ensure accurate payment.  The Employee
Service Centre will arrange for the employee to be advised on a regular basis of the
payment that has been processed within their pay.
Pension
Acting up and higher duties payments are counted towards pensionable service but do
not count towards payments associated with redundancy, sickness, or maternity leave.
8. Stand-In Arrangements (Hourly difference) 
When a situation occurs where full cover is required for a higher graded post at short
notice, managers will be able to select an appropriate employee to undertake the duties
and responsibilities of that post for a maximum period of 2 weeks, after which the normal
acting up or higher duties process should be followed.  Employees who are undertaking
stand-in will be paid from the commencement of the arrangement,  however, they will
not be paid for any periods of leave during that time.  
Employees doing Stand-in duties will be paid the difference between their own hourly
rate and that of their placing on the higher graded post.  Again, the promotional rule as
described earlier in this document should be used to determine their placing on the
higher graded salary scale.  
Employees who are on stand-in arrangements and undertake overtime in the higher
graded post during that period, should receive the difference between the overtime paid
at the higher and lower rate.
Page 106 of 276

Page 107

Acting Up and Higher Duties for Single Status Employees
8
9.  Selection Process 
Higher Duties
The line manager should identify the gap in duties required to be undertaken using the
job description of the higher graded post. Where a specific task is the reason, discussion
should take place with the line manager and Service HR Business Partner to identify the
duties required to be undertaken along with the grade and percentage to be paid.
The manager must determine the duties to be covered and produce a written statement
of these duties. (Please refer to Appendix 1).  Thereafter, approval must be sought from
the relevant Chief Officer and Service HR Business Partner to proceed.
When approved, the line manager, should email/contact those employees who are in
surrounding or directly associated roles to advise of the opportunity to undertake higher
duties.  The email/contact should clearly advise of the duties involved, the percentage of
duties to be undertaken and an indication of the time that the cover will be required. 
Employees who are interested will be asked to express an interest by completing the form
attached at Appendix 2.
If more than one employee expresses an interest, a fair and reasonable selection process
must be applied which must include a formal discussion in the form of a professional
dialogue meeting held by a panel of 2 Senior Officers.  
Once the individual(s) have been selected, the line manager will confirm to the employee
that they have been successful, detailing the duties they will undertake and the
percentage of payment they will receive and the likely commencement and end dates of
the arrangement.  
The line manager will ensure that the workload is reasonable and will discuss and agree
the prioritisation of work. 
Acting Up
Following approval from the Service HR Business Partner, the manager should confirm
what percentage of acting up is required for the vacant post (this should in most cases
be 100%).  
Once approved, the line manager, should email/contact those employees who are in
surrounding or directly associated roles to advise of the opportunity to act up.  The
email/contact should clearly advise of the duties involved, the percentage of duties to be
undertaken and an indication of the time that the cover will be required.  Employees who
are interested will be asked to express an interest by completing the form attached at
Appendix 2.
When selecting an employee to act up, a fair and reasonable selection process must be
applied that includes an interview process if there is more than one suitable applicant or
Page 107 of 276

Page 108

Acting Up and Higher Duties for Single Status Employees
9
a formal discussion where there is only one applicant.  Service HR Business Partner teams
will provide support and assistance where needed.  
In the case of acting up/higher duties (100%), the line manager will require to ensure the
employee’s substantive role is also suitably covered.  
Backfill of Posts 
When it is deemed necessary and following discussion with the Service HR Business
Partner, if the substantive post of those employees who are acting up or undertaking
higher duties, require to also be covered, agreement must be sought via the Council’s
Workforce Change Steering Group to allow this to be facilitated. 
10.  Appointment to Permanent Post
Where an employee has been acting up to a higher graded post for less than a year, and
the employee is appointed to the post on a permanent basis, the employee will be placed
on the first point of the higher grade which will ensure an increase in renumeration of at
least an amount equal to the smallest increment on the higher grade scale.  Where an
employee has been acting up to a higher graded post for one year or more and is
appointed to the higher graded post on a permanent basis, the salary placing will be  the
same point on the scale they are currently on when under the acting up arrangement.
Where an employee has been undertaking higher duties (less than 100%) for less than a
year and is appointed to the post on a permanent basis, the employee will be placed on
the first point on the higher grade which will ensure an increase in renumeration of at
least an amount equal to the smallest increment on the higher grade.  Where an
employee has been undertaking the higher duties for a year or more (less than 100%),
their current earnings including the value of the percentage of duties being undertaken
at the higher grade will be added together with their current basic salary to provide a
gross salary and they will be placed on the first point of the scale that is nearest to this
value.
Where an employee has been undertaking 100% higher duties for one year or more and
is appointed to the higher graded post on a permanent basis, the salary placing will be 
the same point on the scale they are currently on when under the acting up arrangement.
11.  Equal Opportunities and Review
This guidance note will be regularly reviewed by the Chief Officer,  People Resources and
monitored by the People Resources team in respect of gender, ethnicity, disability, sexual
orientation, age, and all factors pertaining to equality of opportunity regulations. 
Page 108 of 276

Page 109

Appendix 1 
Calculation for Acting Up or Undertaking Higher Duties
Acting Up
In order to establish the percentage of duties that an employee is required to undertake
through acting up, (if not the full 100% of the role) the line manager should review the
job description for the higher graded post and identify the actual tasks that will be
undertaken.  
If the job description of the higher graded post has 16 points and the employee acting up
is required to undertake 8 of those points, the percentage to be paid would be 50% (8
divided by 16 x 100%).  If they are required to undertake 13 of those points, the
percentage to be paid would be 80 % (13 divided by 16 x 100%).  
When determining what tasks on the higher graded post the employee will undertake,
consideration has to be given to their current job role responsibilities and whether or not
someone is required to act up into their post.
Higher Duties
The same process as detailed above applies to higher duties, except where there is no
vacancy, and the employee has been asked to undertake a specific task or project that
merits a higher duties payment. Where this is the case, the task or project at hand should
either be in an existing job description within the service or comparable with another
one.  Where this is the case discussion should take place between the Senior Business
Partner for the Service and the Job Evaluation team to identify the appropriate higher
grade and percentage of payment.  
Agreement
When the decision has been taken as to what duties are required to be undertaken, the
manager should discuss this with the employee and provide details of the duties to be
undertaken in writing using the template below:
Dear (Employee)
You have agreed to undertake the following duties on an acting up/ higher duties on a
temporary basis with effect from (Date):
1.  list the duties as detailed within the relevant job description.
2.
3.
As advised, during the period that you are undertaking these duties, you will be paid a
percentage of the difference between your current grade and that of the higher graded post
or duties.  This currently equates to X%.
Page 109 of 276

Page 110

As explained you will not be paid higher duties during periods of sickness absence, maternity
leave or annual leave.
You will be contacted in advance of any changes to this arrangement.
Regards
Manager
Page 110 of 276

Page 111

EXPRESSION OF INTEREST
ACTING UP/HIGHER DUTIES 
The following form should be completed when one or more persons have been identified as
being suitable for consideration for acting up or undertaking higher duties on a temporary basis
and for a period of 12 months or less. 
SECTION 1: PERSONAL DETAILS 
Surname:                                                                               
First Name(s): 
Employee Number: 
Job Title: 
Grade & Salary/Wage:   
Service: 
Location: 
Email: 
SECTION 2: EDUCATION & TRAINING
Please provide details of the qualifications you hold that are relevant to the post for which
you will be acting up or undertaking higher duties. 
Page 111 of 276

Page 112

SECTION 3: SKILLS, KNOWLEDGE AND COMPETENCIES
Using bullet points, please detail the skills, knowledge and competencies that you have
that are relevant to the post for which you will be acting up or undertaking higher duties.   
SECTION 4: PERSONAL SKILLS/QUALITIES
Please use this section to discuss what personal qualities/life skills/life experiences you
have which are relevant to the post for which you will acting up or undertaking higher
duties. 
Page 112 of 276

Page 113

SECTION 5:  ADDITIONAL INFORMATION
Use this section to detail any other information that you wish to be considered 
SECTION 6:  DECLARATION
Please sign below to confirm that the information provided within this form is correct and
accurate. 
Signed:   ________________________________   Date:___________________
(Print) 
Signed:   ________________________________   Date:___________________
(Signature) 
Page 113 of 276

Page 114

Page 114 of 276

Page 115

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref     Date 21/05/25 
Programme of Work Progress Report: Digital North Lanarkshire,
Performance Optimisation, Enhanced Security Monitoring 
From  Rachel Blair, Chief Officer (Legal and Democratic)
Greg Telfer, Chief Officer (Finance and Technology)  
E-mail BlairR@northlan.gov.uk
TelferG@northlan.gov.uk Telephone 07958 166105
07958 010692 
Executive Summary
A target of the council’s Digital and IT Strategy 2024 – 2027, approved by the Policy and
Strategy Committee in March 2024, is to: 
• Enhance security monitoring to maintain effective access and control over
council data as the council delivers the anticipated increase in its digital
footprint. 
This ambition is managed through the council’s programme of work. More specifically, it is
coordinated through the Performance Optimisation programme, which in turn forms part of
the Digital North Lanarkshire suite of deliverables. Three themes consisting of nine
outcomes sit under this programme. This paper looks at activities undertaken to date in
delivering three of these outcomes: 
1. Develop organisational security model/standards/principles.
2. Identify vulnerable products and mitigating options.
3. Develop and deploy compliance reporting. 
All three are in progress with implementation on 1 and 3 well under way and due to
complete within schedule. With the security standards model in place and standards now
being produced in line with that – and that latter activity being viewed as something that
will continue indefinitely – 1 can be considered as almost complete, albeit with the
Performance Optimisation Subgroup requiring to sign off to that effect. Deliverable 2 –
identify vulnerable products and mitigating actions – is currently on target to deliver a
vulnerability management performance monitoring system and supporting processes by
the intended end Q4 2025/2026 deadline. The Digital North Lanarkshire Performance
Optimisation Subgroup will be asked to consider extending this project by one further year,
however, to include an assessment of the success or otherwise of any newly deployed
systems and processes. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the progress made to date in achieving the council’s ambition to
deliver the three deliverables that fall within the scope of this report.  
Item 4
Page 115 of 276

Page 116

1. Background 
1.1 The council has previously undertaken evaluation exercises to identify areas of
relative weakness that may nevertheless be of importance in managing its information
and cyber security risk. Such exercises have identified the priority activities that are
now being addressed through what is essentially an information risk management
and cyber security improvement strategy. These activities are documented and have
their progress tracked through the council’s Programme of Work (PoW). 
1.2 Nine deliverables have been separately identified within the PoW as leading to
enhanced security monitoring. Through these, the council aims to maintain effective
access and control over council data as it delivers the anticipated increase in its
digital footprint. 
1.3 This report looks at the work undertaken to date in progressing three deliverables: 
• Develop organisational security model/standards/principles.
• Identify vulnerable products and mitigating options.
• Develop and deploy compliance reporting. 
1.4 All three commenced during the 2024/2025 financial year and are scheduled to
complete by the end of the 2025/2026 financial year. The reality is that none will stop
being developed through the adoption of continual improvement processes. As such it
is intended that the processes for each will continue to become better defined and
lead to the creation of an adaptable and flexible cyber security assurance reporting
and monitoring framework. For example, in the context of security standards, these
will continue to be developed, managed, maintained and deprovisioned as
appropriate over an indefinite and continuous timeframe. 
1.5 There may be merit in extending the timeline for delivering one outcome – identify
vulnerable products and mitigating options – by up to one calendar year. This is to
give time to assess the use of acquired vulnerability management tooling and
supporting processes as part of a proof-of-concept programme. It is nevertheless still
an aim to have such tooling and processes in place by the scheduled completion
date. 
1.6 None of the activities within the scope of this report will stop being developed through
the adoption of continual improvement processes. As such it is intended that the
processes for each will continue to become better defined and lead to the creation of 
(2) The ‘Business-as-usual’ activities have continued to be delivered by all the
stakeholders involved whilst progressing these themes. 
(3) It should be observed that whilst implementation deadlines have been set for the
delivery of each outcome, the overall theme will continue to develop as part of
continual improvements to the council’s cyber security control set.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Digital North Lanarkshire
Page 116 of 276

Page 117

an adaptable and flexible cyber security assurance reporting and monitoring
framework. For example, in the context of security standards, these will continue to
be developed, managed, maintained and deprovisioned as appropriate over an
indefinite and continuous time. 
2. Report 
2.1 This report looks at progress across each of the following three areas: 
• Standards
• Vulnerability management
• Compliance reporting 
Standards 
2.2 The council has adopted a suite of controls deemed to give appropriate protection to
its digital systems and processes. From a governance perspective, and to move
further along the maturity curve for how information security assurance is managed, a
defining set of key principles next need to be clearly adopted. Such principles are
usually documented in the form of a library of ‘standards’, which can in turn become
one of the pillars supporting the development of an information security management
system (ISMS). These set out the high-level controls to be adopted or outcomes that
are desired. 
2.3 Security standards support the higher-level security and information governance
policies that the council has introduced. The council has an information governance
framework in place that consists of: 
• Information and Cyber Security Policy
• Records and Information Management Policy
• Data Protection Policy
• Payment Card Data Security Policy 
2.4 There are many existing frameworks available to organisations that can be used to
define the structure of an information security standards library. For reasons that will
become clear, the council has settled on the United States’ National Institute of
Standards and Technology (NIST) and their outcomes-based set of controls called
the Cyber Security Framework (CSF) as the framework of choice. 
2.5 The Council has a requirement to conform with the Department for Work and
Pensions’ Memorandum of Understanding (DWP MoU). This is a cyber security-
oriented contract that all organisations which process HMG data must sign up to. This
covers data shared with local authorities by HMRC and DWP for the purposes of
supporting the processing of benefit claims by members of the public. The terms and
conditions of the DWP MoU include adhering with many of their own security
standards. 
2.6 In line with the requirements of the council’s Enterprise Architecture Business
Principle 2 – Reuse before buy, before build – the standards in development contain
public sector information licensed under the Open Government Licence v3.0. To
support compliance with the DWP MoU, these mostly reuse content from DWP’s own
security standards – with prior agreement. Some standards reuse content from other
sources. Each standard attributes the relevant public agencies. 
Page 117 of 276

Page 118

2.7 The DWP has chosen the NIST CSF as their framework of choice, and through
adopting the DWP’s set of standards the council is choosing to align with NIST CSF. 
2.8 A Security Standards Framework (ergo the security model that is the target of this
deliverable) was approved by the Data Governance Board on 26th March 2025. With a
standards roadmap in place, and the development of standards essentially now a
business-as-usual activity based on that roadmap, a case can be made for saying
that this deliverable is now in place. Discussion will take place at a forthcoming Digital
North Lanarkshire Performance Optimisation Subgroup meeting to seek views on
whether this objective can now be determined as having been met, with future
activities transitioning to business-as-usual. 
2.9 The Gantt chart below shows the high-level tasks requiring to be completed through
to the expected completion schedule concluding at end Q4 financial year 2025/2026
(with the development and rollout of standards continuing beyond this as business-
as-usual activity). 
Timeline of activities for developing organisational model/standards/principles 
2.10 Appendix 1 shows an extract from the security standards roadmap, highlighting the
first twelve standards being developed. 
2.11 Appendix 2 of this report includes one of the standards covering cryptographic
controls that has recently undergone internal review. This has been taken through the
Council’s Technology Design Authority and approved subject to further internal
scrutiny before being submitted to the Data Governance Board for final approval. 
Vulnerability management 
2.12 Successfully identifying and managing technical vulnerabilities within IT environments
can significantly reduce exposure to successful cyber attacks. The council operates
‘patching’ programmes which enable core IT systems and software to be updated
with fixes to address discovered security flaws. 
2.13 Processes – and the tools required to support them – that deliver assurance that IT
vulnerabilities are remediated in accordance with the risk they present are not yet fully
adopted. The council undertakes point in time assessments of endpoints through
limited external scanning of its externally exposed services – a requirement of the
Payment Card Industry Data Security Standard – and annual IT health checks of a
sample of endpoints across its technology stack. 
Page 118 of 276

Page 119

2.14 A Gartner (the council’s chosen IT strategic management professional services
partner) self-assessment exercise was undertaken in Q1 of 2023 to help inform the
council’s cyber security, and thus digital and IT, strategy. This showed that whilst
good practices could be evidenced across the entirety of a vulnerability management
(VM) maturity model, some practices are missing. 
2.15 The chief callouts for improvement were: 
• Provide vulnerability assessments to IT operations
• Prioritise remediation based on common vulnerabilities and exposures
(CVE) severity 
2.16 Whilst vulnerability assessments are provided to IT operations, as per 2.13 these are
based on findings from one-off annual IT health checks or external scanning of public-
facing infrastructure. Continual assessment of the technical estate from a VM
perspective is not currently in place. 
2.17 Microsoft Defender provides intelligence in the VM space. However, Defender is not a
dedicated VM tool and Microsoft does not specialise solely in this area. In addition,
the council uses many technologies beyond those provided by Microsoft. VM tooling
provided by vendors of specialist VM solutions may be expected to give more
effective results for an organisation of the size and complexity of the council. 
2.18 To mature VM practices, a programme of improvements has been spun up that will
look to evaluate tools and processes to address the issues observed. To date: 
2.18.1 Capital monies have been obtained to procure dedicated VM tooling that will
provide intelligence about exposure to vulnerabilities across the council’s
corporate estate. This money has been assigned to be spent during the
2025/2026 financial year and used to test the hypothesis that specialist tooling
will provide better results across the entirety of the council’s technology stack
than Microsoft is able to. 
2.18.2 Capital monies were bid for and obtained to employ a fixed-term officer to lead
on a vulnerability management improvement programme. 
2.18.3 From the capital bid described in 2.14.2, a Senior ICT Security Officer has
been recruited to provide focus on this deliverable. This two-year temporary
post was filled as of 24th March 2025. 
2.18.4 Off the back of 2.14.3, engagement with potential vendors of continuous
vulnerability management solutions has commenced as part of an evaluation
of the marketplace. 
2.19 With regards to their focus on vulnerability management, it is proposed to utilise the
temporary post of Senior ICT Security Officer by procuring suitable tooling to operate
a proof of concept, lasting up to one year, of a suitable VM tooling. Over the course of
the trial year, it is proposed to operate the procured tooling and compare usability and
performance against the capability available in Microsoft Defender. 
2.20 The timeline for progressing this deliverable and meeting the expected conclusion of
having solutions in place to meet this objective by end Q4 2025/2026 is shown below: 
Page 119 of 276

Page 120

Timeline of activities for identifying vulnerable products and mitigating options 
2.21 There is merit in considering an extension of the timeline for delivery of this objective
by up to one calendar year, as highlighted by the yellow shaded actions in the Gantt
chart above. This is to build in an opportunity to trial any newly deployed processes
and technologies and provide feedback to executive management in determining a
long term VM solution. 
Compliance reporting 
2.22 In a global context, the council outperforms the Gartner benchmark average within
the Government industry sector in terms of cyber security compliance management.
Cyber security compliance is nevertheless an area of significant importance to many
organisations and North Lanarkshire Council is no different in that regard, given the
potential contractual, regulatory and legislative compliance conditions that it may be
subject to. 
2.23 The main cyber security-focused compliance conditions that the council must meet
are obligated through contract. In the context of this deliverable, three contracts stand
out that could pose a significant risk to the Council should their conditions not be met: 
• Public Services Network – Code of Connection
• Payment Card Industry Data Security Standards
• DWP Memorandum of Understanding 
2.24 The cyber security compliance framework that affects local government can change
quickly. Just as is happening in England and Wales with the Ministry of Housing,
Communities and Local Government phasing in the Cyber Assessment Framework
for local government across that sector, the same could happen in Scotland. If
mandated for the council, that would be a further suite of compliance conditions to be
met.   
2.25 With 2.23 in mind, managing cyber security compliance in an organised and
systematic manner, with a focus on efficiency, can deliver significant benefits to the
council. 
2.26 This deliverable is tied to the development of standards earlier described in this
report. Each compliance requirement should be evidenced as being met through one
or more outcomes in one or more standards. In turn, it should be possible to then
demonstrate how each outcome is met across relevant parts of the council’s
technology estate. The development of a standards therefore suite goes hand in hand
with this objective.
Page 120 of 276

Page 121

2.27 To date, compliance requirements have been extracted from the Public Services
Network – Code of Connection (PSN CoCo) and the DWP MoU. The remaining time
to conclusion of this exercise (end Q4 2025/2026) will be used to: 
• Rationalise the compliance requirements between the PSN CoCo and the DWP
MoU.
• Roll the Payment Card Industry Data Security Standards (PCI DSS) into this
rationalisation process.
• Create the framework that will be used to show which standards and conditions
demonstrate adherence to each cyber security compliance condition that the
council must meet. 
2.28 Mapping all cyber security compliance requirements to a single framework – linking
each condition back to parent regulations, contracts, or legislative requirements and
forward to the standard that demonstrates it as being a mandatory objective for the
council – will initially be a time-consuming process. However, as new compliance
conditions are levied on the council, so the likelihood will increase that they are, in
fact, already being picked up and met through the existing single, overarching
compliance framework. 
2.29 The Gantt chart below shows the timeline of activities that make up this project, and
the aim to conclude successfully at the end of the 2025/2026 financial year: 
Timeline of activities for developing and deploying compliance reporting 
3. Measures of success 
3.1  For the development of standards, success is deemed as having a formally approved
framework in place, a managed roadmap of standards in operation, and standards
being produced at a cadence that supports business objectives. 
3.2 For vulnerability management, success will be to have a working VM tool and
supporting process in operation as a proof of concept by start of 2026/2027 financial
year. Findings from that proof of concept will inform the ultimate direction of the
council in terms of vulnerability management. 
3.3 For cyber security compliance management, success will be to have a compliance
framework developed incorporating PSN CoCo, PCI DSS and DWP MoU
requirements by the start of the 2026/2027 financial year.     
Page 121 of 276

Page 122

4. Supporting documentation   
Appendix 1 – Extract from the council’s security standards roadmap 
Appendix 2 – Information Security and Risk – Use of Cryptography Security Standard 
Rachel Blair     Greg Telfer     
Chief Officer (Legal and Democratic) Chief Officer (Finance and Technology) 
Page 122 of 276

Page 123

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
i) Capital funding has been obtained to create a fixed-term post of Senior
ICT Security Officer to support the selection, onboarding and operation
of a suitable VM product and develop processes to support
management of IT vulnerabilities.
ii) Capital funding has been obtained to procure a VM product as a one-
year proof of concept. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Page 123 of 276

Page 124

Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The three outcomes discussed in this report all have an impact to some degree on
the IT practices within the Council. In creating standards defining minimum security
practices or configurations some technical impact may be felt if systems are
required to be changed or updated as a result. Vulnerability management, to be
well assured, requires the procurement, onboarding and operation of specialist
product and development of supporting processes. And in creating a single cyber
security compliance framework there is the opportunity for missed/overlooked
requirements to be identified requiring a technical change to be met. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The delivery of the three outcomes discussed will enable cyber security risk to be
better managed across the organisation, issues to be identified, and remedial
activities to be undertaken as considered necessary. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 124 of 276

Page 125

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 125 of 276

Page 126

Appendix 1 – Extract from the council’s security standards roadmap 
DWP NLC Sensitivity Public Production order Status Review
dwp-ss007-security-standard-use-of-cryptography SS-007 Use of Cryptography Security Standard Official Yes 1 Consultation
dwp-ss008-security-standard-server-operating-system SS-008 Server Operating System Security Standard Official Yes 2 Consultation
dwp-ss009-security-standard-hypervisor SS-009 Hypervisor Security Standard Official Yes 3 Consultation
dwp-ss025-security-standard-virtualisation SS-025 Virtualisation Security Standard Official Yes 4 Consultation
dwp-ss029-security-standard-securely-serving-web-content SS-029 Securely Serving Web Content Security Standard Official Yes 5 Consultation
dwp-ss004 SS-004 Information Classification and Handling Security Standard Official Yes 6 Published April 2027
dwp-ss012-security-standard-protective-monitoring-standard SS-012 Protective Monitoring Security Standard Official Yes 7 In development
dwp-ss001-part-1-security-standard-access-and-authentication-controls SS-001 (part 1) Access and Authentication Controls Security StandardOfficial Yes 8 In development
dwp-ss033-security-standard-security-patching SS-033 Security Patching Security Standard Official Yes 9 Not started
dwp-ss021 SS-021 IT Systems Resiliency and Disaster Recovery Standard Official Yes 10 Published June 2025
dwp-ss020 SS-020 Supply Chain Security Standard Official No 11 Not started
Page 126 of 276

Page 127

Information Security and Risk 
SS-007: Use of Cryptography Security
Standard 
Version 0.4, [Publish Date] 
This is a controlled document. The digital PDF file published on InsideNL is
the control copy. 
▪ Always access this document from the control location.
▪ When you open this document, your device may automatically download
it. If it does, you should still open it from the control location in future.
▪ You can print this document, but a printed copy isn’t the control copy.
▪ Don’t save any digital copies of this document anywhere. This includes
your device, OneDrive, Teams/SharePoint, or any other digital storage
device, system, service, or location. 
Appendix 2
Page 127 of 276

Page 128

Information Security and Risk
SS-007: Use of Cryptography Security Standard 
Document control
Control details
Title: SS-007: Use of Cryptography Security Standard
Author: Information Compliance Officer
Owner: Information Risk Manager
Subject: Use of cryptography security standard for council information, in
line with the Information and Cyber Security Policy.
This standard defines good practice in terms of using cryptographic
controls to protect the confidentiality and integrity of our electronic
information – in transit or at rest. 
Classification: OFFICIAL
Control location: InsideNL > Documents > Information governance > Information security
and risk > Information security
Save this link to your browser favourites for quick and easy access.
Published version: Version 0.4
Published date: [Publish Date]
Review date: Two years from date of last review or when triggered by DWP changes.
Retention and
disposal:
Retention period: Two years after date superseded
Disposal action: Destroy
Distribution and
communication:
This document is available to all users and the control PDF is published
on InsideNL. It’s primary audience is technical IT staff. We consult and 
inform staff about it through our standard communication and
collaboration channels. This includes reporting on newly published
versions.
Amendment record
Version Amendment details Date amended
0.4 Amendments based on feedback from Technology Strategy
Manager.
10 September 2024
0.3 11.1.1 – removed: ‘Encryption products certified via NCSC
certification for example, Commercial Product Assurance
(CPA) meets the standard.’ 
11.1.3 – removed: ‘as do products certified by the NCSC
Commercial Product Assurance (CPA) scheme.’ 
11.3.1.a – removed: ‘NCSC CPA or’
Appendix B – changed one instance of ‘DWP’ to ‘Authority’,
removed items ‘DDA – DWP Design Authority’, and ‘PDU –
Produce Delivery Units’.
Appendix B – removed ‘v0.9.6’ from end of item B.
Appendix C – replaced ‘Commercial Product Assurance
(CPA)’ with ‘Cryptographic Module Validation Program
(CMVP)’. Added link to NIST FIPS-140. 
28 August 2024
Page 128 of 276

Page 129

Information Security and Risk
SS-007: Use of Cryptography Security Standard 
Version Amendment details Date amended
Appendix E – removed ‘CPA, Commercial Product
Assurance, NCSC’.
0.2 Amendments based on first round of comments. 26 July 2024
0.1 New document 23 July 2024 
Page 129 of 276

Page 130

Information Security and Risk
SS-007: Use of Cryptography Security Standard 
Version 0.4
Contents
1 Introduction ................................................................................................................... 1
2 Open Government License for public sector information: Attribution statement ............ 2
3 Security outcomes ......................................................................................................... 2
4 Purpose ......................................................................................................................... 2
5 List of terms ................................................................................................................... 3
6 Scope ............................................................................................................................ 3
7 Exclusions ..................................................................................................................... 3
8 Governance ................................................................................................................... 4
9 Compliance ................................................................................................................... 4
10 Exceptions process ....................................................................................................... 5
11 Minimum technical security measures ........................................................................... 5
11.1 Software and hardware requirements ................................................................. 6
11.2 Cryptographic algorithm requirements ................................................................ 6
11.3 Generation of cryptographic key material............................................................ 7
11.4 Compression ....................................................................................................... 8
11.5 Message padding ................................................................................................ 8
11.6 Encryption in transit ............................................................................................ 8
11.7 Encryption at rest ................................................................................................ 9
11.8 Passwords ........................................................................................................ 10
11.9 Cryptographic key management ....................................................................... 10
12 Appendices ................................................................................................................. 11
Appendix A: Security outcomes ................................................................................... 11
Appendix B: Internal references .................................................................................. 12
Appendix C: External references ................................................................................. 12
Appendix D: Abbreviations .......................................................................................... 13
Appendix E: Glossary .................................................................................................. 14
Appendix F. Accessibility artefacts .............................................................................. 14
Appendix G: DWP source document revision history .................................................. 14 
Page 130 of 276

Page 131

Information Security and Risk
SS-007: Use of Cryptography Security Standard 
Version 0.4 
A note about plain English
This document follows plain English guidance, in line with our corporate commitment to
clear communications. In particular, it uses the following terms. 
▪ ‘We’, ‘us’ and ‘our’ when referring to the council (as an organisation), our collective
responsibilities (as authorised users of council IT assets), and when discussing
specific activities.
▪ ‘You’ and ‘your’ when referring to the individual responsibilities and actions of
authorised users of council IT assets.
We reuse text from the Department of Works and Pensions in this document.
▪ We can’t guarantee that text will follow plain English guidance. 
▪ It uses the term ‘the Authority’ when referring to the council.
▪ It uses technical language, but this is audience appropriate. 
Page 131 of 276

Page 132

Information Security and Risk
SS-007: Use of Cryptography Security Standard 
Version 0.4  1 
1. Introduction 
This standard defines a set of mandatory security measures for implementing
cryptographic controls to mitigate risks, and or comply with legal and regulatory
requirements, in line with our information governance policies. 
▪ Data Protection Policy ▪ Payment Card Data Security Policy
▪ Information and Cyber Security Policy ▪ Records and Information Management Policy 
We must implement cryptographic controls whenever it is necessary to protect the
confidentiality and integrity of electronic information – in transit or at rest – from threats
facing the council and its suppliers. Threats can be physical or logical in nature such as
media containing sensitive data being stolen, or hackers sniffing data packets across the
network. We can also use cryptographic controls to authenticate the identities of both the
sender and recipient to one another and protect against repudiation. 
This standard only provides minimum security measures. As such, we should exceed
them as appropriate, depending on: 
▪ the threats and risks we need to address, 
▪ the sensitivity of the data, and 
▪ the latest security enhancements. 
We derive these security measures from industry best practice. This includes guidance
published by the following organisations. These form the basis of the mandatory UK
compliance frameworks we operate within. 
▪ NIST – National Institute of Standards and Technology
▪ CIS – Center for Internet Security
▪ OWASP – Open Worldwide Application Security Project 
Implementing cryptographic controls – user responsibilities
Information asset owners and anyone authorised to manage, administer, process or
otherwise use our information on our behalf must do the following.
1. Comply with our information governance policies.
2. Decide if it’s appropriate to encrypt the information. Examples of when we must use
cryptographic controls are as follow.
▪ Sending sensitive data over a network.
▪ Storing sensitive data in a multi-tenanted cloud hosted environment – for
example, passwords, personal citizen information. 
▪ Connecting remote workers from home to access the council network. 
▪ Protecting citizen data at rest – for example, in databases or object stores. 
▪ To comply with legal or regulatory requirements.
3. Implement cryptographic controls – where needed – in line with security measures
set out in this standard, and related documents.  
Page 132 of 276

Page 133

Information Security and Risk
SS-007: Use of Cryptography Security Standard 
Version 0.4  2
We support using appropriate security controls, as selected by our technical experts or our
third-party providers. For example, the CIS Critical Security Controls v8 controls set. See
Appendix C for full list external references. 
As far as is possible, our security measures are vendor and technology agnostic. This
makes it easier to apply the standard regardless of the technologies we use. We may
implement security measures in different ways, depending on technology choices and
business requirements. 
2. Open Government License for public sector information:
Attribution statement 
This document contains public sector information licensed under the Open Government
Licence v3.0. Specifically, it reuses the contents of the Department of Work and Pensions
(DWP) security standard SS-007: Use of Cryptography. We update this document in line
with that DWP standard. See Appendix G for detailed revision history. 
3. Security outcomes 
Security standards ultimately support the security outcomes we want to achieve. They do
the following. 
1. Set the expectations for what needs to be done to achieve them and why, 
2. Provide an objective, measurable statement of our existing security posture. 
To make sure we closely align with the NIST Cyber Security Framework (CSF), we base
the outcomes – detailed in Appendix A – on the official NIST sub-categories, where
possible, using the appropriate controls from the CIS Critical Security Controls v8 controls
set. See Appendix C: External references. 
4. Purpose 
This document sets out security standards for systems and services that use cryptography
to encrypt our data. It does the following. 
▪ Makes sure we design, configure, deploy and manage systems and services
consistently, to protect against typical threats at the OFFICIAL tier.
▪ Provides a baseline for assurance and compliance activities to make sure our security
obligations are being met or exceeded. 
The aim of this standard is to make sure we do the following. 
1. Allow technical teams to work towards a set of minimum-security measures, based on
industry best practice.
2. Make sure we implement security controls consistently. This applies to the following.
a. Designing, developing and deploying cryptographic controls. 
Page 133 of 276

Page 134

Information Security and Risk
SS-007: Use of Cryptography Security Standard 
Version 0.4  3
b. Configuring cryptographic controls to only use council approved cryptographic
algorithms as defined in our Approved Cryptographic Algorithm document
[Reference B].
c. Enforcing the use of independently assured cryptographic products, where needed.
3. Mitigate risks from common threats and vulnerabilities to an acceptable level for
operation.
4. Support the achievement of security outcomes described in Appendix A. 
5. List of terms 
This security standard contains both mandatory and advisory elements, using the following
terms.
Term Intention
must Denotes a requirement: a mandatory element. 
should Denotes a recommendation: an advisory element.
may Denotes approval. 
might Denotes a possibility. 
can Denotes both capability and possibility. 
is/are Denotes a description. 
6. Scope 
All IT assets – business systems, networks, and end user devices including portable
storage devices – that we use to manage, process and store our electronic information are
in scope of this standard. It applies whenever we must use cryptographic controls. 
Everyone working for us or on our behalf, involved in the design, development,
implementation and operation of systems, services and applications must adhere to this
standard. That is, employees, contractors, consultants, third party service providers, and
anyone else we identify as within its scope. 
7. Exclusions 
The following exclusions apply. 
1. There are certain measures regarding the use of cryptography in the cloud deliberately
excluded from this standard, as this is covered in SS-023 – Cloud Computing Security
Standard [Reference C]. As such, you must read this standard in conjunction with SS-
023.
Page 134 of 276

Page 135

Information Security and Risk
SS-007: Use of Cryptography Security Standard 
Version 0.4  4
2. Cryptographic key management is a fundamental aspect of ensuring the security of
information protected by cryptography, however this area is outside of the scope of this
standard and is covered elsewhere in SS-002 PKI and Key Management Security
Standard [Reference D]. 
8. Governance 
The Data Governance Board has approval authority for, and oversight of, this standard,
including any exceptions to it. The Senior Information Risk Owner is accountable for its
governance. 
The Technical Design Authority (TDA) is responsible for the following. 
1. Oversee the review of this standard and consider its contents before referring it on for
approval.
2. Assess any exception requests.
3. Collectively and individually promote compliance with this standard. 
The Information Security and Risk team is responsible for the following activities. 
1. Produce, publish and promote this standard.
a. Write it in an audience appropriate way that’s easy to read and understand.
b. Consult with relevant stakeholders on its content and implications.
c. Make sure all intended users can access it.
2. Give guidance on how to apply and comply with this standard – including managing
exceptions – through policies, procedures, guidance notes, and direct advice.
→ Email any questions to the Information Security and Risk team.
3. Review and report on this standard.
a. Review every two years, with other reviews when needed. For example, a change
to the source DWP standard, a change to the law, the government updates its
guidance, an audit action.
b. Report to management teams, governance and working groups, committees and
scrutiny panels. 
9. Compliance 
Users of this standard must do the following to comply with it. 
1. Apply this standard in the design, assurance, and audit of relevant technical solutions
deployed across the council and supplier base, where applicable. 
2. Apply the security measures to new and existing installations.
3. Include adherence to the security measures in all contracts for outsourced services
where applicable.
4. Consider accessibility design requirements. See Appendix F for more information on
accessibility standards.  Page 135 of 276

Page 136

Information Security and Risk
SS-007: Use of Cryptography Security Standard 
Version 0.4  5
We will verify compliance with this standard through various methods, including but not
limited to the following. 
▪ Controls tests performed by first-line teams and by second line activities such as
security testing.
▪ Security assurance activities to make sure architectural design and delivery are
appropriate and align to applicable Authority security standards. [See Security
Assurance Strategy – Ref O].
▪ Independent external audit. 
We will feedback results to the appropriate risk and system owners. 
10. Exceptions process 
In this document we use the term ‘must’ is used in bold letters to indicate a mandatory
security measure. If you identify any exceptions in applying this standard, or can’t adhere
to specific security measures, you must explain – in detail – the reasons why and define
the resulting risks. In doing so, you must do the following follow before proceeding. 
1. Consult with the Information Security and Risk team to:
a. confirm any design caveats or exceptions, and
b. clarify the potential impact of any deviation to the security measures detailed in this
standard.
2. Refer to the Technical Design Authority further assessment and to agree a
recommended course of action.
3. Present the recommendations to the to the Data Governance Board for consideration. 
The Information Security and Risk team will: 
1. maintain a register of exceptions to the standard for accountability, traceability, and
security governance; and
2. report on exceptions as per 3a. above. 
11. Minimum technical security measures 
The following section defines the minimum technical security measures that we must meet
to achieve the outcomes described in Appendix A. For ease of reference, this includes the
relevant NIST subcategory identifier for each security measure – for example, PR.DS-5 –
to indicate which outcome(s) it contributes towards. Refer to Appendix A for full
descriptions of security outcomes. 
Note: Where FIPS 140 – that is, Federal Information Processing Standard – is referenced,
the dash numbers are not included – for example, FIPS 140-3. The reason for this is that
these represent versions of the standard that are valid for a limited time for certification to
be issued against. These certificates have a defined lifespan, so that older versions of the
FIPS 140 standard expire over time. Hence newer versions of the FIPS standard are
automatically covered.  Page 136 of 276

Page 137

Information Security and Risk
SS-007: Use of Cryptography Security Standard 
Version 0.4  6
11.1. Software and hardware requirements
Reference Minimum technical security measures NIST ID
11.1.1 The Cryptographic software deployed must be selected having
an active validation to FIPS 140 and FIPS 197. [See External
references].
PR.DS-5
PR.DS-1
PR.DS-2
ID.BE-4
11.1.2 Cryptographic software must be maintained in accordance with
SS-033 Security Patching Standard [Reference E].
PR.IP-12 
11.1.3 Cryptographic hardware deployed must have an active
validation against a recognised scheme. FIPS 140 and FIPS
197 meet this standard [See NIST CMVP in External
references].
PR.DS-5 
PR.AC-5
11.1.4 Cryptographic software / hardware must be deployed,
configured, and operated in accordance with the security
procedures and cryptographic manual supporting the products’
validation.
PR.IP-1
PR.IP-3
PR.DS-1
PR.DS-2
PR.AC-5
11.1.5 Cryptographic software / hardware must only be used when
still under active vendor support or still inside its validation
period.
PR.MA-1
PR.IP-3
11.1.6 Where applicable cryptographic operations must be performed
on hardware, this requires appropriate validations to be in
place;
a. For HSMs, FIPS 140 at level 3 or higher 
b. For TPMs, v2.0 or higher 
Where applicable, cryptographic operations must be used in
software, this requires appropriate validations to be in place; 
a. For software packages, FIPS 140 at level 2 or higher; 
b. For software libraries, FIPS 140 at level 1 or higher  
PR.DS-5 
11.2. Cryptographic algorithm requirements
Reference Minimum technical security measures NIST ID 
11.2.1  Cryptographic algorithms and modes of operation must be
selected from the Authority’s Approved Cryptographic
Algorithms document [Reference B].
Note. Approval by the Authority is indicated by inclusion in the
above document. Where multiple algorithms are deployed, the
order of preference given by this document must also be
technically enforced.
PR.IP-1 
Page 137 of 276

Page 138

Information Security and Risk
SS-007: Use of Cryptography Security Standard 
Version 0.4  7
Reference Minimum technical security measures NIST ID 
11.2.2  Approved asymmetric cryptography must be used where the
use of symmetric cryptography is inappropriate, for example,
weaknesses in implementation, unable to handle certificate
exchange or physical key exchange, or for authentication
purposes. 
PR.DS-1, 
PR.DS-2 
11.2.3  The list of approved cryptographic algorithms must be
reviewed at least annually. 
PR.IP-1 
PR.IP-3 
11.2.4  Approved hashing algorithms must be used as the basis for:  
a. Creating message digests;
b. Generating digital signatures;
c. Message Authentication Codes (MACs / HMACs);
d. Pseudorandom Functions (PRFs);
e. Key Derivation Functions (KDFs).
See the Authority’s Approved Cryptographic Algorithms
document [Reference B] for approved algorithms.
PR.AC-1, 
PR.AC-6 
11.2.5  Where information is to be encrypted and authenticated, the
Message Authentication Code (MAC) must be computed after
encryption (i.e. encrypt-then-MAC). 
PR.DS-6 
11.2.6  Use of Elliptic Curve Cryptography (ECC) curves and key
parameters must be selected from those recommended in the
latest version of FIPS 186. 
PR.DS-6 
11.2.7  Use of Diffie Hellman key exchange algorithm must be used in
conjunction with the following parameters as appropriate:
1. DH Group 19
2. DH Group 20
3. DH Group 21 
PR.DS-2, 
PR.PT-4 
11.3. Generation of cryptographic key material
Reference Minimum technical security measures NIST ID 
11.3.1  Where pseudorandom number generation is required, but not
provided as part of vendor software, (including initialisation
vectors), this must use cryptographically secure sources of
entropy. Acceptable sources are:
a. External modules which have received FIPS 140
certification.
b. Operating system certified sources (for example, Microsoft
CryptoAPI:NG, /dev/random). 
PR.DS-5 
PR.IP-1 
PR.IP-3 
Page 138 of 276

Page 139

Information Security and Risk
SS-007: Use of Cryptography Security Standard 
Version 0.4  8
Reference Minimum technical security measures NIST ID 
11.3.2  Virtual Machines (VMs) and operating systems running on
Solid State Drives (SSDs) will require an assured feed of
pseudorandom data from an external entropy feed (as per the
section above), as they cannot be relied upon to produce their
own, except in the case where an external module described in
section 11.3.1 above is deployed. 
PR.DS-1 
PR.DS-2 
ID.BE-4 
11.4. Compression
Reference Minimum technical security measures NIST ID 
11.4.1  Compression of data must be a separate process to the
encryption and decryption operations themselves.
Compression routines that execute alongside encryption and
decryption functions (for example, TLS compression) must not
be used.
PR.IP-1
PR.DS-6 
11.5. Message padding
Reference Minimum technical security measures NIST ID 
11.5.1 Messages to be encrypted by an approved asymmetric
algorithm must use PKCS#1 v2.2 minimum. Fallback to earlier
version is not allowed.
PR.DS-1,
PR.DS-2,
PR.IP - 1 
11.6. Encryption in transit 
Reference Minimum technical security measures NIST ID 
11.6.1  Encrypted communication transiting Authority owned and / or
supplier managed infrastructure must be designed to support
content inspection capabilities as per SS-006 Security
Boundaries Security Standard [Reference A]. 
PR.PT-4
PR.PT-1
11.6.2 Encrypted communications channels must be protected using
protocols, protocol suites and techniques in accordance with
the relevant cryptographic manual, the Authority’s Approved
Cryptographic Algorithms document [Reference B] and require
Authority approval of the solution.
PR.DS-2, 
PR.DS-5, 
PR.PT-4
Page 139 of 276

Page 140

Information Security and Risk
SS-007: Use of Cryptography Security Standard 
Version 0.4  9
Reference Minimum technical security measures NIST ID 
11.6.3 Encrypted sessions  must re-negotiate new symmetric keys
after one of the following criteria is met:
a. The data volume specified in the validation has exceeded
its maximum limit 
b. The time limit specific in the validation has exceeded its
maximum limit.
PR.DS-1, 
PR.DS-2 
11.7. Encryption at rest 
Reference Minimum technical security measures NIST ID 
11.7.1  All user-writeable partitions on portable devices (laptops,
mobile phones, portable storage devices etc.) must be
encrypted at the media-level (i.e. Full Disk Encryption (FDE)).
PR.DS-1
11.7.2 Where applicable, the master encryption key must reside
within assured cryptographic hardware and must not leave the
assured cryptographic hardware for the master keys’ service
life. 
PR.DS-5 
PR.DS-1 
PR.AC-1
11.7.3 Information held encrypted at rest must also be integrity
protected.
PR.DS-6 
PR.DS-8
11.7.4 Where multiple layers of encryption are available (for example,
media-level and database field-level), each layer must be
applied proportionally to mitigate risks identified during a risk
assessment process. 
PR.DS-1 
PR.DS-5
11.7.5 The encryption software deployed on devices as described in
11.7.1 must require sufficient entropy as part of the
authentication mechanism. In a scheme that uses a password
as the authentication mechanism, this equates to a password
that is of sufficient length and complexity to match the
requirements in the password policy defined for the system.
PR.AC-1 
PR.AC-7 
PR.DS-1 
PR.DS-2
11.7.6 Encryption software deployed on devices (i.e. laptops, portable
storage devices) must restrict the number of authentication
attempts within any given time interval. Where the number of
attempts and time interval are not specified as part of the
product’s certification, these values must be configured in line
with the password policy for the system/device in question.
PR.AC-1 
PR.AC-7 
PR.DS-1 
PR.DS-2  
Page 140 of 276

Page 141

Information Security and Risk
SS-007: Use of Cryptography Security Standard 
Version 0.4  10
11.8. Passwords
Reference Minimum technical security measures NIST ID 
11.8.1  Authentication information which grants authorised access to
asset(s) must:
a. not be stored in plain text or in any reversible format;
b. be salted with at least 128 bits of pseudorandom data;
c. be hashed using a method described in the Authority’s
Approved Cryptographic Algorithms Document
[Reference B].
PR.DS-1 
PR.AC-1 
PR.AC-4 
11.9. Cryptographic key management
Reference Minimum technical security measures NIST ID 
11.9.1  Cryptographic keys must be managed and protected in
accordance with the controls present in SS-002 PKI and Key
Management Security Standard [Reference D].
PR.DS-1,
PR.DS-2 
ID.RA-1 
ID.RA-3 
ID.RA-5 
Page 141 of 276

Page 142

Information Security and Risk
SS-007: Use of Cryptography Security Standard 
Version 0.4  11
12. Appendices 
Appendix A: Security outcomes
The minimum security measures in this standard help us achieve the security outcomes in
the table below. For consistency, the official NIST sub-category IDs carry through to the
standards.
Reference Security outcome (sub-category)  Related security measures
ID.BE-4 Dependencies and critical functions for
delivery of critical services are established.
11.1.1, 11.3.2 
PR.AC-1  Identities and credentials are issued,
managed, verified, revoked, and audited
for authorized devices, users and
processes. 
11.2.4, 11.7.5, 11.7.6 
PR.AC-5  Network integrity is protected (for example,
network segregation, network
segmentation. 
11.1.3 
PR.AC-6  Identities are proofed and bound to
credentials and asserted in interactions. 
11.2.4 
PR.DS-1  Data-at-rest is protected.  11.1.1, 11.2.2, 11.3.2, 11.5.1,
11.6.3, 11.7.1, 11.7.4, 11.8.1,
11.9.1 
PR.DS-2  Data-in-transit is protected.  11.1.1, 11.2.1, 11.2.7, 11.3.2,
11.5.1, 11.6.2, 11.6.3, 11.9.1 
PR.DS-5  Protections against data leaks are
implemented.
11.1.1, 11.1.4, 11.1.6, 11.3.1,
11.6.2, 11.7.2 
PR.DS-6  Integrity checking mechanisms are used to
verify software, firmware, and information
integrity. 
11.2.5, 11.2.6, 11.7.3 
PR.IP-1  A baseline configuration of information
technology/industrial control systems is
created and maintained incorporating
security principles (for example, concept of
least functionality). 
11.1.4, 11.2.1, 11.2.3, 11.3.1 
PR.IP-3  Configuration change control processes
are in place. 
11.1.4, 11.1.5, 11.2.1, 11.3.1
PR.IP-12  A vulnerability management plan is
developed and implemented. 
11.1.2, 11.4.1 
Page 142 of 276

Page 143

Information Security and Risk
SS-007: Use of Cryptography Security Standard 
Version 0.4  12
Reference Security outcome (sub-category)  Related security measures
PR.MA-1  Maintenance and repair of organisational
assets are performed and logged, with
approved and controlled tools. 
11.1.5 
PR.PT-1  Audit/log records are determined,
documented, implemented and reviewed in
accordance with policy, 
11.6.1 
PR.PT-4  Communications and control networks are
protected. 
11.2.7, 11.6.1, 11.6.2 
Appendix B: Internal references
Below is a list of internal documents you should read along with this standard. 
Reference Document  Publicly available
A SS-006 Security Boundaries security standard  Yes
B Authority Approved Cryptographic Algorithms No
C SS-023 Cloud Computing Security Standard  Yes
D SS-002 PKI and Key Management Security Standard  Yes
E SS-033 Security Patching Standard Yes
Note: Email the Information Security and Risk team to request access to non-publicly
available documents. 
Appendix C: External references
Refer to the following publications for further guidance.
Document 
Cryptographic Module Validation Program (CMVP)
NIST SP 800-57 Part 1 Revision 5 – Recommendation for Key Management: Part 1 -
General 
NIST Special Publication 800-107 Revision 1, Recommendation for Applications Using
Approved Hash Algorithms 
Transitioning the Use of Cryptographic Algorithms and Key Lengths (nist.gov) 
NIST SP 800-132, Recommendation for Password-Based Key Derivation Part 1: Storage
Applications 
Page 143 of 276

Page 144

Information Security and Risk
SS-007: Use of Cryptography Security Standard 
Version 0.4  13
Document 
FIPS 140-3, Security Requirements for Cryptographic Modules | CSRC (nist.gov) 
Appendix D: Abbreviations 
Abbreviation Definition 
CTR  Counter 
DH  Diffie Hellman 
FDE  Full Disk Encryption  
FIPS  Federal Information Processing Standard 
GCM  Galois/Counter Mode 
HMAC  Keyed-hash Message Authentication Code 
ISO  International Organisation for Standardization 
KDF  Key Derivation Functions 
MAC  Message Authentication Code 
NCSC  National Cyber Security Centre  
NIST  National Institute of Standards and Technology 
NIST CSF  NIST Cyber Security Framework 
PRF  Pseudorandom Functions 
PKCS  Public Key Cryptography Standard 
PKI  Public Key infrastructure  
RBG  Random Bit Generator 
RDP  Remote Desktop Protocol 
SHA  Secure Hash Algorithm 
SSD  Solid State Drives 
SSH  Secure Shell 
TLS  Transport Layer Security 
TPM  Trusted Platform Module 
Page 144 of 276

Page 145

Information Security and Risk
SS-007: Use of Cryptography Security Standard 
Version 0.4  14
Abbreviation Definition 
USB  Universal Serial Bus 
VM  Virtual Machine 
Appendix E: Glossary
Term Definition 
Initialization Vector (IV) A binary vector used as the input to initialize the algorithm for
the encryption of a plaintext block sequence to increase
security by introducing additional cryptographic variance and
to synchronize cryptographic equipment.  
Public Key Infrastructure
(PKI) 
The architecture, organisation, techniques, practices, and
procedures that collectively support the implementation and
operation of a certificate-based public key cryptographic
system. Framework established to issue, maintain, and
revoke public key certificates.
Message Authentication
Code (MAC) 
A cryptographic checksum on data that uses a symmetric key
to detect both accidental and intentional modifications of the
data. 
Trusted Platform
Module (TPM) 
A tamper-resistant integrated circuit built into some computer
motherboards that can perform cryptographic operations
(including key generation) and protect small amounts of
sensitive information, such as passwords and cryptographic
keys. 
Appendix F. Accessibility artefacts
See the UK Government’s Digital Accessibility guidance, including the following. 
▪ Guidance and tools for digital accessibility - GOV.UK 
▪ Understanding accessibility requirements for public sector bodies - GOV.UK 
Appendix G: DWP source document revision history
Version Description  Date
1.0 First published version 04/2017
Page 145 of 276

Page 146

Information Security and Risk
SS-007: Use of Cryptography Security Standard 
Version 0.4  15
Version Description  Date
2.0 Full update in line with current best practices and standards,
recorded NIST references and made changes to grammar. 
Introduction and Scope updated for Mandatory ‘must’
statements and introduced Crypto manual.
FIPS 140 and CPA assurance requirements updated
throughout. 
11.1 Reworded 
11.1.4 - refined requirement to implement in accordance with
Crypto manual that supports assurance TOE 
11.2.1 and 11.4.1 - grammar refresh 
11.5.1 - PKCS minimum version updated
11.6.3 subsumed into 11.6.2 
11.7.2 Introduced TPM 
11.8.1 updated Salt value 
07/12/2022 
Page 146 of 276

Page 147

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref          GT/MB Date 21/05/25 
Microsoft Enterprise Agreement 2025-2028 – Procurement Update 
From  Greg Telfer, Chief Officer (Finance and Technology) 
E-mail TelferG@northlan.gov.uk  Telephone 07583 010692 
1. Background 
1.1 The Council’s digital ambitions have seen a significant change in how employees
communicate and collaborate using Microsoft 365 Enterprise Edition Licenses
introduced by Business and Digital through a Microsoft Enterprise Agreement (EA).
Microsoft Licenses support and enable digital transformation, service redesign and
business change processes. 
1.2 The current Enterprise Agreement (EA) facilitates council-wide provision of Microsoft
Licenses and support. It includes Server Cloud Enrolment (SCE), Enrolment for
Education (EES), Dynamics and Centre of Excellence licenses and Azure
consumption. This contract is presently with Phoenix Software Ltd and is due to expire
on 31 March 2025. 
Executive Summary
The purpose of this report is to update the Finance and Resources Committee on
procurement activity relating to the Microsoft Enterprise Agreement (EA) contract and to
highlight the finally agreed contract value as outlined in the report. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledges the award of contract procured via a collaborative procurement
procedure through the Crown Commercial Service (CCS) and Digital Office NFC180
Provision of Microsoft Licenses and related services to the value of £10,883,000.
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (18) Ensure our digital transformation is responsive to all people's
needs and enable access to the services they need
Programme of Work Digital North Lanarkshire
Item 5
Page 147 of 276

Page 148

1.3 Licenses contained within the Microsoft Enterprise Agreement (EA) enable users
across the Council, including the school estate to securely access desktop/laptop
software, and on premise and cloud-hosted servers. 
2. Report 
2.1 Members will recall from the Finance and Resources Committee on 20 November 2024
the procurement activity undertaken within Business and Digital to renew its portfolio
of Microsoft Licences and associated support across all agreements detailed in section
1.2 above for a period of three years from 1 April 2025 to 31 March 2028. 
2.2 In order to maximise efficiencies within procurement and following the Finance and
Resources Committee on the 20 November 2024 which approved the recommendation
to award a contract for the agreements mentioned in section 2.1, the council
participated in a collaboration procurement exercise led by the Scottish Government’s
Digital Office which provides councils the opportunity to take part in an aggregated
procurement for Microsoft licences. 
2.3 CCS undertook the procurement in October 2024 through their framework ‘Technology
Products & Associated Services 2 (TPAS2) Lot 3 Software’ with only those on the
Commercial Agreement able to submit a bid. The procurement had a response from 7
suppliers who were all scored against a 90% commercial and 10% technical envelope
with the successful bidder being Phoenix Software Solutions ranked in 1st place as
detailed in Appendix 1. 
2.4 Discounts available on Microsoft Licences are negotiated every three years between
CCS and Microsoft as part of a Memorandum of Understanding (MoU) where CCS use
national buying power to agree preferential pricing and discounts on products and
services across the technology landscape. In November 2024 CCS announced a new
Strategic Partnership Agreement (SPA24) which took effect from 1 November 2024.
SPA24 is aligned with a strategic approach to access enhanced value across public
sector organisations when procuring digital products and services which are used daily
in the delivery of public services. 
2.5 Members will recall that due to the timing and release of SPA24 a benchmarking
exercise was undertaken and reported to Finance and Resources Committee in
November 2024 with a final report intended to follow and be published in cycle two of
2025 offering Committee Members final contract values and to report any potential
increases in Microsoft License prices affected by SPA24. 
2.6 Since the release of SPA24 pricing, the discounts across Modern Workplace licenses
and Business Application licenses have continued to be in line with the previous
discounts available through the earlier iteration of SPA24, DTA21 which was used as
part of the benchmarking exercise noted in section 2.5 therefore the final contract value
can now be noted as £10,883,000. Note the previous statement reported to Finance
and Resources Committee on 20 November at 5.2 referenced scope for revenue costs
to increase, however the final contract price is a fixed price therefore no increase is
expected. 
2.7 The pricing mechanism is a fixed priced contract for individual licences offering a good
level of cost certainty; any fluctuation in overall contract value will be related to volume
changes throughout course of contract. 
2.8  The council is committed to maximising the delivery of community benefits and fair
working practices. The aggregation exercise being undertaken by CCS includes social
Page 148 of 276

Page 149

value at tender stage using the social value priority theme of tackling economic
inequality.   
2.9 Officers from Finance and Technology will be responsible for managing the contract
which will be undertaken in accordance with the council’s agreed approach to contract
and supplier management. 
3. Measures of success 
3.1 The proposed contract award detailed within this report will deliver the following
outcomes: 
a) The successful and optimum provision of Microsoft Licenses across a
subscription model for Microsoft 365 services.  This includes the Microsoft
Office product lines in the Microsoft Enterprise Agreement (EA), including
Server and Cloud Environment (SCE) and Enrolment for Education Solutions
(EES), Dynamics & Centre of Excellence licenses and Azure consumption. 
b) That best value will be both demonstrable and achieved. 
c) That the performance of contracts awarded are proactively managed against
the council’s agreed approach to contract and supplier management. 
4. Supporting documentation 
4.1  Appendix 1 -  Supplier NFC180 Aggregation Tender Response Matrix 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 149 of 276

Page 150

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?     
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 150 of 276

Page 151

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Microsoft Licenses whether modern workplace, digital platform or cloud services are
required to enable council employees to undertake their work. These licenses help
support and enable digital transformation, service redesign and business change
processes. 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 151 of 276

Page 152

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles
from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐  
Page 152 of 276

Page 153

Appendix 1 
NFC180 Results 
Supplier NFC180 Aggregation Tender Response Matrix 
Lot 2     
Supplier
Name
Total Bid
Price (Capped
Cost)
Weighted
Commercial
Score (90%)
Weighted
Technical
Total
(10%)
Total
Score
Rankin
g
Bytes £40,474,514.88 88.00 10.00 98.00 4
CDW £40,470,098.45 88.01 6.60 94.61 6
Insight £40,490,674.88 87.97 6.60 94.57 7
Phoenix £39,576,603.19 90.00 10.00 100.00 1
Softcat £40,259,713.66 88.47 10.00 98.47 2
Trustmarque £40,286,978.55 88.41 10.00 98.41 3
Ultima £40,065,697.11 88.90 6.60 95.50 5 
Page 153 of 276

Page 154

Page 154 of 276

Page 155

North Lanarkshire Council
Report
Finance and Resources Committee
Does this report require to be approved?
Ref    3081 Date
☒ Yes   ☐ No
21/05/25
Land Surplus to Operational Requirements at Ailsa Road,
Coatbridge  
From James McKinstry, Chief Officer (Assets and Procurement)
E-mail SullivanC@northlan.gov.uk Telephone Chris Sullivan
07939 280579
Executive Summary
The purpose of this report is to seek council consent to declare an area of land extending
to 37 square metres or thereby surplus to council requirements. The area of land is
located at Ailsa Road, Coatbridge and is shown on Cartographic Drawing 48215 at
Appendix 1 to this report. Scottish Power Energy Networks have enquired about the
possibility of the land being declared surplus to council requirements with a view to
leasing the land to them for a new electricity substation. The requirement for a new
substation is to ensure the continuity of a reliable electricity supply in this locality in
future.
In keeping with council procedure, as there has been an objection from a local councillor
to the proposed future use of this land, this paper is presented to committee for
determination. 
Recommendations
It is recommended that the Finance and Resources Committee:
(1) Consider the contents of this report and the local member’s objections,
(2) Agree the proposal to declare the land surplus to council requirements. Thereafter
the council’s Estates Team can consider future use in keeping with council policy.
The Plan for North Lanarkshire
Priority Improve the health and wellbeing of our communities
Ambition statement (3) Maximise the use of our marketable land and assets through
improved development in business and industrial infrastructure
Programme of Work Statutory / corporate / service requirement
Item 6
Page 155 of 276

Page 156

1. Background 
1.1 Scottish Power Energy Networks (SPEN) have indicated that they wish to explore the
possibility of the council owned land (37 square metres or thereby) shown on
Cartographic Drawing 48215 at Appendix 1 to this report being leased to them for the
purpose of installing a new electricity substation. 
1.2 They have advised that due to the electrical network in the Ailsa Road area being at
the end of a long section, it will suffer most from volt drop in future if there is no action
taken. The connection of a new substation will also allow for increased capacity for
local residents to connect new green technologies in future such as electric car
charging and heat pumps. In addition, a new substation will provide additional
network security to the area.   
2. Report 
2.1 The land consists of a section of maintained amenity grass within a larger area of
maintained amenity grass and is situated within an established area of primarily
privately owned housing in Coatbridge. 
2.2 In keeping with the council’s surplus property procedure for areas of ground that
amount to fewer than 50 square metres, the council Holding Service (Housing) have
been consulted on the proposal to declare the land surplus to requirements. There
have been no objections in principle to the land being declared surplus to their
requirements as the land is not considered to be of current or future operational use
to Housing. 
2.3 Owing to the proposed size of the substation being under 29 cubic metres planning
permission would not be required as the installation would come under permitted
development rights. SPEN have advised that they would seek to engage with the
local community throughout the course of the project. As part of the works they would
undertake a letter drop in the local area to notify affected customers and explain the
purpose of the works to them. Doorstep conversations will take place with customers
whose properties will be directly affected by any digging works. Any publicity material
used will have a contact from SPEN listed on them, who will be available for
customers to contact during working hours. A modern glass reinforced plastic
enclosure will be used to ensure that there is minimal visual impact to the area. 
2.4 Local councillors within the applicable ward have been consulted on the proposal to
declare the land surplus to requirements. A meeting was convened between the
Council, SPEN and two local members to discuss some concerns. However, the
objection from one local member to the proposed substations remains. It should be
noted that declaring land/property surplus and the potential future use are two distinct
matters. In the ordinary course of things, local councillors are consulted with a view to
discovering any objections in principle to council land or property being declared
surplus. In the case of Ailsa Road, the proposal to declare the land surplus has been
entirely prompted by the interest of Scottish Power in siting a new electricity
substation there to ensure continuity of supply in the immediate area. It is therefore
difficult to separate the surplus declaration from the proposed future use.  The points
of objection are outlined below with responses provided by SPEN undernoted. 
Page 156 of 276

Page 157

1. This piece of land is very close to an end of terrace house and the driveway used
for access round the back of the property. It would make very little sense to place
anything so close to such a property - especially considering the noise and safety
aspect. 
Response: The boundary of the substation will sit 3-4 metres to the east of the
driveway and will therefore not cause disruption to their access. All of the
transformers that SPEN install fall well within the industry standard for noise
regulation and are quieter compared to older transformers on the network. 
2. Concern about fires 
Response: A standard package substation contains an oil filled transformer, which is
protected from fault energy by fuses and circuit breakers. In the event of a fault, the
protective equipment on SPEN networks operates to de-energise equipment before
disruptive failure occurs. The substation proposed for this site is the same as every
other substation up and down the country, in every housing scheme in Britain, and
this site is considered no more high risk of fire than any others. SPEN can look at
installing a midel filled transformer. Midel is an alternative insulating liquid used in
transformers instead of oil in high- risk locations such as substations enclosed within
buildings or within basements.
SPEN substations are housed within a glass reinforced plastic housing. To prevent
against vandalism, SPEN substation enclosures have a fireproof rating compliant with
BS 467-7. According to SPEN Specification for Prefabricated Glass Reinforced
Plastic Enclosures: “The Enclosure shall be treated to reduce flammability. Sources of
ignition include internal equipment failure, careless handling of propane gas torches
and deliberate acts of vandalism. The resin shall comply with BS 476-7 Class 2 for
external and internal fire rating, regarding surface spread of flame.”
To prevent unauthorised access to equipment, the enclosure doors are fitted with
padlocks that can only be opened by staff authorised by Scottish Power. If it is
deemed necessary SPEN can install a fence around the substation to increase
security. 
3. Concern about access for work to maintain the substation. 
Response: Equipment installed in a modern substation is considered to be
maintenance free. Access to this substation would generally only be required to carry
out restoration of power in the event of a power cut, or to carry out switching
operations to reconfigure the network for routine work. Switching operations only
require one person to gain access for 10-15 minutes at a time. As this is a brand new
substation, it will be fitted with tele-control facilities which will allow SPEN’s control
room to carry out switching operations remotely, thereby reducing the frequency for
staff to gain access. The SPEN maintenance department carries out annual 
inspections of all substations to ensure that they remain safe, tidy and to catch any
potential problems before they arise. Any issues flagged up during an inspection are
dealt with as soon as possible. 
4. Concern about local children playing near the substation. 
Response: The substation would sit within a glass reinforced plastic enclosure, which
is securely locked and can only be accessed by trained SPEN operatives. Further to
this, within the enclosure there is no exposed live electrical equipment. All electrical
Page 157 of 276

Page 158

equipment inside the enclosure is locked inside cabinets, which can only be opened
by authorised SPEN staff. Because of this, the danger to children playing near the
substation is considered to be minimal. 
5. I also believe this is something the local community would wholly object to. 
Response: As part of any future works, SPEN  will carry out a letter drop to inform
residents of the benefits of the new substation and to inform them of work before this
takes place.
6. The land would also require preparation due to the hill on the middle of it and I
fear this would cause further disruption in the locale where traffic is already at high
volume. 
Response: This piece of land does not require any extra preparation compared to
standard ground works for a package substation. Local residents will be informed of
works before they take place and doorstep conversations will take place to ensure
work will have minimal disruption for residents in the area. 
7. I do not believe this piece of land to be appropriate to build on for any purpose. 
Response: This piece of land is considered the most appropriate location for SPEN
to install the new substation. The area around Ailsa Road has been identified as an
area of high predicted load growth and this patch of land provides SPEN with a
central location to distribute the required power to the area. The new substation is
required to keep up with the predicted load growth and will benefit the residents of the
area by providing a greater security of supply, greater capacity to keep up with the
increasing uptake in low carbon technologies and ensure that electrical supplies
remain within their statutory limits in future. 
2.5  The land at this location has been identified by SPEN as the best location to ensure
security of the supply in this area and provide for anticipated future needs. The
Council owns limited amounts of land with the immediate locality and therefore this
site is considered the most suitable to meet SPEN’s requirements. 
3. Measures of success 
3.1  If the land is declared surplus to council requirements, then future development of the
ground for the proposed substation will help ensure resilience and continuity of supply
within the local electricity network. The Council will also obtain a capital receipt for the
lease of the ground.     
4. Supporting documentation 
Appendix 1 – Cartographic Drawing 48215 
James McKinstry
Chief Officer (Assets and Procurement) 
Page 158 of 276

Page 159

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 159 of 276

Page 160

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 160 of 276

Page 161

Appendix 1 – Cartographic Drawing 48215 
Page 161 of 276

Page 162

Page 162 of 276

Page 163

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  GT Date 21/05/25 
Strategic Performance Framework - latest performance results for
Business and Digital 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 
Executive Summary 
Following consideration of the One Place, One Plan - Governance Update report at Policy
and Strategy Committee in September 2024, responsibilities within Business and Digital
transferred across the remits of three Chief Officers (i.e. Finance and Technology, Legal
and Democratic, and Strategy and Engagement) with effect from 2025/26 onwards. 
The purpose of this performance report to Finance and Resources Committee specifically
covering Business and Digital performance is to formally close out performance reporting
for Business and Digital as at the 2024/25 year end. 
For strategic overview and scrutiny purposes, this report provides Members of the Finance
and Resources Committee with an update of the latest results for the suite of performance
indicators used by Business and Digital to inform service delivery and underpin operational
decisions.  This report is presented in line with the Finance and Resources Committee’s
role to monitor the performance of all services within the remit of the Committee (as per
the terms of reference in the Scheme of Administration). 
Moving forward, performance measures within Business and Digital will be realigned to the
respective Chief Officers reporting responsibilities accordingly and this will be reflected in
future reports to the respective committee. 
Recommendations 
It is recommended that the Finance and Resources Committee: 
(1) Review the high-level performance overview presented in Appendix 1, and the
supporting data contained within the linked Excel spreadsheet, and identify where
further information is required to understand or investigate performance further. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Item 7
Page 163 of 276

Page 164

1. Background 
1.1 There are six inter-related strategic frameworks which are key to evaluating the
success of The Plan for North Lanarkshire and assessing delivery towards achieving
the overall vision by ensuring each stage is appropriately aligned, planned, guided,
implemented, monitored, and governed.   
1.2 The six frameworks focus on ensuring a corporate one council approach in respect of
Policy, Governance, Performance, Self-Evaluation, Project Management, and
Demonstrating Improved Outcomes for Communities.   
1.3 The Strategic Performance Framework comprises performance
measurement at three levels (as per the diagram on the right).  This
aims to collectively provide an overview of performance to help
understand the impact of council activities on improving services and
outcomes for the people and communities of North Lanarkshire.  The
measures in this Framework allow for day to day activities, and
progress towards achieving the long-term vision set out in The Plan
for North Lanarkshire, to be regularly monitored, reported, assessed,
and scrutinised.   
1.4 The Strategic Performance Framework is aligned to the Accounts Commission’
Statutory Direction which places a requirement on councils to report a range of
information in terms of (1) improving local services and outcomes, and (2)
demonstrating Best Value.  Key points of note in this respect are that the Accounts
Commission also expect to see: 
(a) A balance in terms of reporting that captures highlights of good performance as
well as areas of performance requiring improvement.
(b) Reporting that is undertaken in a timely manner.
(c) Easy access to performance information for all citizens and communities.
(d) Comparisons of performance (i) over time (e.g. compared to previous years), and
(ii) with others (e.g. other local authorities or the national average (where available
and appropriate). 
The council’s comparative performance in Local Government Benchmarking
Framework (LGBF) indicators can be viewed through the Improvement Service’s online
dashboard: https://www.improvementservice.org.uk/benchmarking/explore-the-data   
1.5 A Performance Reporting Schedule supports the timely submission of a range of
performance information to ensure fully informed review, reporting, scrutiny, and
decision making processes by Elected Members and senior management.  This
Schedule, endorsed by the Audit and Scrutiny Panel, includes Chief Officer’s individual
Performance Reviews at Service Committees in line with the Strategic Performance
Framework. 
1.6 This report therefore presents the Finance and Resources Committee with the latest
performance results for Business and Digital for Members’ further review and scrutiny. 
2. Strategic Performance Framework 
Finance and Resources Committee responsibilities 
Programme of Work Statutory / corporate / service requirement
Page 164 of 276

Page 165

2.1 In line with the terms of reference outlined in the Scheme of Administration, the Finance
and Resources Committee is responsible for monitoring and reviewing performance
information for the following Ambition Statements from The Plan for North Lanarkshire.   
18.  Ensure our digital transformation is responsive to all people’s needs and
enables access to the services they need.
24.  Review and design services around people, communities, and shared
resources.
25.  Ensure intelligent use of data and information to support fully evidence based
decision making and future planning. 
2.2 The high-level performance overview in Appendix 1 presents Members with a summary
of the latest results for each performance indicator within the remit of the Chief Officer
(Business and Digital). 
2.3 The information in Appendix 1 comprises the undernoted. Appendix 2 provides
additional context in respect of the council’s approach to the measurement of indicators
and setting of targets. 
• An ideal direction arrow - this indicates whether a higher or lower figure is the
preferred direction of travel.   
• Measurement unit - for example whether the result is a %, a number, a unit cost
(in £), or a ratio.
• Performance results for the most recent financial years (depending on availability
of data) along with the latest year’s target and corresponding RAG status (for
indicators where it is appropriate to set targets).   
• The most recent monthly or quarterly results, along with the corresponding target
and RAG status.  Note the inclusion of this information is dependent on the
measurement frequency of the indicator and availability of data as at the time of
reporting. 
• A trend graph - this captures the direction of travel achieved over the years and
includes the most recent monthly or quarterly results where available.
• Comments - narrative summarising the current position and providing an
explanation for any significant variations in performance.  Where applicable, this
narrative also highlights any internal or external factors impacting on service
delivery. 
2.4 A large volume of data supports the high-level performance overview in Appendix 1. 
This is outlined in the latest performance results for Business and Digital Excel
spreadsheet which is available through the following link for Members to carry out a
deep dive and review and scrutinise each performance indicator further.  The Menu on
the second tab of the spreadsheet contains built in hyperlinks that automatically take
the user to a tab for each performance indicator and therefore provides a useful
navigation aid to review the contents of the file.
• Latest performance results for Business and Digital.xlsx 
Current context 
 A higher figure is better
 A lower figure is better
Key to RAG status
Green Performance is on target and/or within acceptable thresholds
Red Performance does not meet target and is outwith acceptable thresholds
Blue Performance surpasses the target and exceeds expectations
Page 165 of 276

Page 166

2.5 The service’s operating environment has changed significantly in recent years and, as
such, the performance information presented in Appendix 1 should be considered
within the context of the following: 
• Service specific advancements in terms of the procurement of the Connectivity
project in December 2021.
• The end of the contract with Agilisys in April 2022 and the ensuing significantly
reduced resource available from 2022/23 onwards. 
• Development of an Integrated Programme Plan from 2022/23 to capture all areas
of activity across the service to support resource planning and operational delivery,
as well as the relevant programme / project management and governance. 
• Continuous delivery of activities that mitigate against potential cyber security
threats, while transitioning all critical products to more secure and modern cloud
hosted solutions.
• A rapidly changing and evolving service structure following:
- Approval to insource those services previously outsourced to Wipro (supplier
of the ICT service delivery contract).
- The alignment of service provision following the insourcing of culture, sport,
and leisure services (previously delivered through Culture and Leisure NL
Limited).
- Integration of the schools’ technician’s service.
- Significant recruitment challenges across many service areas, reflecting
national shortages in all IT disciplines (software developers, cyber / security
specialists, and network engineers).
• The extent to which the service has supported the council in terms of responding
to and recovering from the pandemic, while resuming business as usual activities
at pace and delivering on the digital vision set out in the new Digital and IT Strategy
for 2024 to 2027 (approved at Policy and Strategy Committee in March 2024) via
the Digital North Lanarkshire Programme of Work. 
2.6 Members are aware that Digital North Lanarkshire was maintained as one of the seven
priorities for delivery in the Programme of Work to 2028.  Members are also aware that
such includes residual activity from the original DigitalNL programme.  With the Chief
Officer (Business and Digital) departing the council in April 2025, the Chief Officer
(Finance and Technology) is confirmed as the Senior Responsible Officer (SRO) for
this Programme of Work priority moving forward. 
2.7  Through the delivery of the Digital North Lanarkshire priority, activities are focusing on
developing a skilled digital workforce, promoting an innovative sustainable culture, and
providing digital leadership for an evolving North Lanarkshire. This means building on
existing achievements and embedding digital thinking into everyday delivery,
embracing digital technology to do business significantly differently, and always
considering a digital-first approach.  Digital North Lanarkshire has strong links to the
One Service Programme of Work as both are enablers to facilitate the delivery of all
other linked Programme of Work priorities. 
Recent performance highlights 
2.8 The council’s connectivity programme seeks to introduce fibre-based service provision
across North Lanarkshire, improving access and choice for local residents and
businesses.  According to the Ofcom Connected Nations update, 98.6% of properties
in North Lanarkshire receive superfast broadband - the 5th highest of all 32 local
authority areas in Scotland. 
• Superfast broadband, also called Fibre to the Cabinet (FTTC), is a combination of
Page 166 of 276

Page 167

fibre and cable technology. Fibres go to the cabinet on the street, and from there,
copper cables (as used in cable broadband) go to a house. This makes superfast
broadband vastly more accessible, as the copper cables are mostly already
installed to provide landlines. Ofcom define superfast broadband as supporting
download speeds of at least 30Mbit/s.  To put this in context, it has around the
same megabits per second as 4G on a mobile phone. For streaming, only around
1.5 or 2.8 mbps is needed for HD quality, while most everyday tasks only need a
maximum of about 20mbps. 
• Fibre connectivity requires fibre optic cabling which supports higher speeds than
the copper cables used in traditional networks.  Latest statistics illustrate fibre
availability within the council area has increased from less than 3% in 2021 to
31.8% in 2023, and increasing further to 43.4% in 2024, thus demonstrating the
successful delivery of a key aim of the connectivity programme.  This also means
that the council is now well placed to facilitate the fibre-enabled innovation
highlighted within the Digital North Lanarkshire programme of work.
• To illustrate the benefits available, members are advised that fibre connectivity is
also called Figure to the Premises (FTTP), meaning that with fibre coming directly
into a house, connection to services and products is much quicker than with the
comparable FTTC outlined above.  Typically, ultrafast broadband has download
speeds of more than 300mbps with 5G reaching up to 1 gbps of service.  This also
means that if a house doesn’t have a phone line, or if it stops working for some
reason, then internet access will not be affected.  If a business or a household is
accessing the internet a lot, and several people are trying to do many things at
once, then ultrafast broadband is much quicker as it can handle more simultaneous
uploads and downloads.
• Business and Digital presented the following reports to committee during 2024/25
to illustrate how and where the council has used the options available to it within
the approved Connectivity Framework to support delivery of the Digital and IT
Strategy and the digital vision therein.
- A report to the Communities Committee in February 2024 provided an update
on the delivery of the added value and community benefits experienced as at
that date within the connectivity contract.
- A report to the Finance and Resources Committee in February 2024 provided
an update on the implementation and operational status of the Connectivity
Framework approved by committee in December 2021, and the performance
of the approved provider Commsworld Ltd.
- An in-depth review of digital broadband was also considered by the Audit and
Scrutiny Panel in May 2024.  This provided an up to date position in respect of
a range of questions regarding the delivery of the connectivity contract,
including the number of kilometres of fibre which have been rolled out, number
of properties covered by the fibre roll out, and number of properties able to take
up / access services from Commsworld aligned providers. 
- A six monthly report on delivery of the Digital and IT Strategy 2024-27 to Policy
and Strategy Committee in March 2025 provided an update on various aspects
around the wider programme of work. This advised that the connectivity
contract had been used to deliver free public wi-fi to staff, pupils, businesses,
and communities through deployments in corporate buildings, leisure centres,
libraries, high schools, integrated day service centres, homeless shelters, and
retirement housing complexes.
- A report to Finance and Resources Committee in February 2025 summarised
the delivery and successful completion of the connectivity programme. 
Areas of performance requiring improvement 
2.9 The Business and Digital senior management team review of performance results in
Page 167 of 276

Page 168

Appendix 1 highlighted two areas with a Red RAG status which required further 
examination and for which further work is underway to improve performance.  There is 
also one area (data breaches) which continues to remain under review. 
• Data breaches - While reporting on data breaches has improved across the
council and the volume in this respect has decreased during 2024/25 - reflecting
improved understanding of process and responsibility, as well as monitoring and
the implementation of improvements - the council’s performance in this area
continues to be kept under review.  
• The annual Senior Information Risk Owner (SIRO) report for 2024 submitted to the
Finance and Resources Committee in February 2025 comprises a section which
specifically details improvements in the council’s performance in this respect. 
• A proportion of data breaches can be attributed to e-mail misuse which are
frequently due to simple mistakes, e.g. selecting the wrong address using auto
complete, sending an e-mail with an expanded distribution list instead of using the
BCC option, e-mailing the wrong address with unrelated information, or e-mailing
a personal address rather than a business address. 
• This was identified by the Senior Information Risk Owner (SIRO) as an area of
focus for 2025, with Business and Digital committing to deploying a technology
solution during the year to enhance e-mail security and reduce the risk of users
sending potentially sensitive e-mails to unintended recipients, while also providing
an enhanced level of protection overall in respect of incoming malicious e-mails.
As at end of March 2025, the service has established a proof of concept that uses
rules and evolving pattern recognition to mitigate this risk. Through this Egress
Prevent proof of concept, officers are monitoring outbound and internal e-mail
traffic to alert users to potential data breaches, ideally stopping them before they
happen.  
• Performance in this area continues to undergo ongoing scrutiny in various forums
across the council (including the Data Governance Board, Business Management
Team, and Service Senior Management Teams) and Chief Officers continue to
monitor employee uptake of the mandatory e-learning modules (including that for
information security awareness) on a monthly basis with remedial action being
undertaken for non-completion. 
• Requests for the IT service desk being logged through the self-serve portal -
Performance in 2024/25 shows this indicator has improved but remains below the
target (of 70%) at 62%.  When broken down further this reflects a year to date
position of 71% corporate and 40% schools.   
The use of the service desk portal remains strong within the council’s corporate
environment, and as more self-help functionality is developed this will become
increasingly useful for staff. The chat functionality is in the process of being
removed for a number of months to allow modernisation of the user interface and
improve alignment with the HR Service Desk portal, with the intention to merge
into a single employee portal in the future.  Schools use of portal is less successful,
partly due to culture and partly due to availability, however with all school areas
now utilising dedicated individual accounts, this is anticipated to increase. 
• Service desk - % of all severity level 3 incidents resolved within target -
Previous reports to Finance and Resources Committee advised that this was an
area of activity under ongoing review since the insourcing of Wipro when this
indicator was changed to capture all severity level 3 tickets in order to provide a
more complete picture of all incidents that require to be resourced by the service. 
This has increased the volume of incidents recorded within this indicator and
required ongoing and closer analysis of demand in order to fully understand the
Page 168 of 276

Page 169

asks of the service and manage these in a way that takes into consideration all the
related component parts of the service to be delivered as well as improvements
required in the longer term. 
While the rise of agile working, increased adoption of third party services, and
vacancies in resolver groups are recognised as increasing the overall complexity
of incident types and the time taken (as frequently these involve interaction with
both third parties and staff moving from differing environments), trends continue to
show a long-term decline in performance (which reflects upon the increased
stability of the estate and the device build in particular) and performance continues
to remain below the stated target (i.e. performance in 2024/25 remains below the
revised target (of 85%) at 73.6% with 7,135 out of 9,692 incidents resolved within
target to date. 
While there is an understanding that aspects of this are due to how the system is
being used rather than a true indication of performance, it is recognised that the
metrics that are measured and the service levels applied are in general those
determined over 10 years ago and hence are planned for review.  As such,
research is underway via industry bodies and peers in terms of what metrics are
being measured and their purpose and usefulness, with the intention to report back
with recommendations that demonstrably align to organisational need and
ambition. 
Next steps 
2.10  As noted in paragraph 1.5, the Strategic Performance Framework is supported by a
Performance Reporting Schedule. This sets out the arrangements for service, statutory,
and Strategic Performance Framework reporting to committee.  As noted in the
Executive Summary of this report, moving forward the performance indicators within
the former Business and Digital service will be realigned to respective Chief Officers
reporting responsibilities accordingly and this will be reflected in future reports to the
respective committee. 
3. Measures of success 
3.1  Measures of success include:
• Regular oversight and monitoring of performance across the organisation to gain
assurances in terms of governance and accountability.
• Regular review and challenge processes to scrutinise the performance of the
council to ensure effective use of resources and that resources are directed in
accordance with agreed policy and according to priorities, while ensuring sound
decision making and clear accountability for the use of resources in achieving
improved outcomes for service users and the local community.  
• Performance monitoring, management, and reporting arrangements that support
the demonstration of improved performance in local services and outcomes, and
the delivery of Best Value. 
4. Supporting documentation 
Appendix 1 -  High-level performance overview. 
Appendix 2 - Note for information in respect of performance indicators and targets. 
Page 169 of 276

Page 170

Greg Telfer
Chief Officer (Finance and Technology) 
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Page 170 of 276

Page 171

Paragraph 2.8 of the report includes an update regarding the delivery of the
council’s world class digital infrastructure. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
The implementation of the Strategic Performance Framework, and Member’s
scrutiny of individual services therein, contributes towards the mitigation of the risks
on the Corporate Risk Register for Governance, Leadership, and Decision Making.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 171 of 276

Page 172

Appendix 1
Business and Digital
High-level performance overview - as at April 2025 
Page 172 of 276

Page 173

Page 173 of 276

Page 174

Page 174 of 276

Page 175

Appendix 2 
Note for information in respect of performance indicators and targets 
It should be noted that the nature of particular areas of service being measured in order to assess and manage performance do not always lend
themselves to a traditional approach to either measuring performance or setting targets, for example: 
• Some indicators (and targets) are required to monitor performance against a commitment or minimum standard the council has made in
advance to achieve a stated level of performance when delivering a service. 
• Some indicators (and targets) are required to assess compliance with legislative requirements.
• Some targets represent the level of performance that the council aims to achieve from a particular activity in either the short, medium, or
long-term.
• Some indicators are needed to help present a complete picture of performance in the round, as a single performance indicator used in
isolation rarely tells the whole performance story and a range of indicators are required to reflect the economic, efficient, and effective
aspects of demonstrating best value. 
• Some indicators and targets can help to support accountability to the public in terms of demonstrating best value and an efficient and
effective approach to the delivery of services. 
• Some indicators are monitored to ensure the council complies with specific requirements, such as information governance or health and
safety.
• Some indicators are monitored to provide added context in order to help interpret performance results or supplement other existing
measures. Information such as this can be critical to enhance knowledge and decision making in terms of demand to help determine
priorities and allocate resources. 
• For some indicators it is not appropriate to set targets as it is the trend in the data (i.e. the direction of travel) that provides more meaningful
information to allow for an assessment in relation to whether performance has improved.
• Some indicators are national benchmarking indicators where their purpose is to allow for comparisons with other councils and the national
average.  These benchmarks are, in essence, can openers designed to focus questions on why variations in cost and performance are
occurring between similar councils.
• Some indicators are proxy measures, particularly in the case of measuring outcomes, as without directly measurable data for a desired
outcome the only alternative is to use a proxy that is an indirect measure of the desired outcome but which is itself strongly correlated to that
outcome. 
Page 175 of 276

Page 176

Page 176 of 276

Page 177

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT / PH Date 21/05/25 
Revenues and Benefits Update 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 07583 010692 
Executive Summary
This report provides an update on the performance within the Revenues and Benefits
functions of Finance as at 31 March 2025. 
Key points to note include: 
• As at 31 March 2025, 94.52% of Council Tax due for 2024/25 had been collected. This
is a marginal increase from the same period last financial year (0.47%). 
• Non-Domestic Rates collection has shown a year-on-year increase from 94.62% to 31
March 2024 to 94.81% to 31 March 2025. 
• The Service continues to meet statutory timescales for administering benefits
applications and changes of circumstance. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the content of the report. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work Statutory / corporate / service requirement
Item 8
Page 177 of 276

Page 178

1. Background 
1.1 The Finance Service is responsible for the administration and collection of all local
taxation in North Lanarkshire in the form of Council Tax and Non Domestic Rates. 
1.2 In addition, the Service administers a number of benefits for residents of North
Lanarkshire including Housing Benefit, Council Tax Reduction, Scottish Welfare Fund,
Discretionary Housing Payment, Free School Meals, Clothing Grants and Blue
Badges. 
2. Report  
Council Tax 
2.1 The graph below shows the cash collected at 31 March for each financial year. It is
worth noting that cash is allocated to specific Council Tax years so the graph
represents cash received against the initial billing year (i.e. billed and received in
2024/25) and does not include cash collected in subsequent years (i.e. billed in
2023/24 but received in 2024/25). This ensures a like for like comparison. 
2.2 The collection figure to 31 March in the 2024/25 financial year of 94.52% is 0.47%
higher than the same period last financial year. 
2.3 It should be noted that in-year collection of Council Tax is a Statutory Performance
Indicator. However, it does not reflect the overall collection rate of Council Tax which
includes collection of prior year arrears. This latter measure has a greater bearing on
the Council’s finances and is reflected in the regular budget monitoring reports to
Committee. 
Page 178 of 276

Page 179

Non-Domestic Rates 
2.4 The following graph shows the cash collected at 31 March for each financial year: 
2.5 The collection figure to 31 March in the 2024/25 financial year is 94.81%. This
represents an increase of 0.19% compared to the same time period in 2023/24. 
Housing Benefits 
2.6 The data below highlights the Statutory Performance Indicators measuring the speed
of processing for new Housing Benefit claims and for changes in circumstances. The
table below shows the cumulative figures for the 2024/25 financial year. 
Days to Process 2023/24 2024/25 DWP Processing
Target
New Claims  15 15 < 30 days
Change of Circumstances  8 9 < 16 days 
2.7 The Service continues to meet DWP targets aligned to the statutory requirements for
the speed of processing of both new claims and changes of circumstances. 
2.8 To further improve efficiency the Service continues to progress a number of digital
related improvements such as development of the Landlord Portal and robotic process
automation for a number of high-volume tasks. 
Council Tax Reduction Scheme 
2.9 As at 31 March 2025 a total of £26.364m in Council Tax Reduction has been awarded
for the 2024/25 financial year. This compares to £26.097m to the same period during
2023/24, representing an increase of £0.267m (1.02%). 
2.10 The Service received 6,775 applications between 1 April and 31 March 2025 compared
with 7,497 during 2023/24, representing a decrease of 9.63%.  
Page 179 of 276

Page 180

2.11 The Service saw an upward trend in the volume of changes in circumstances requests.
From 1 April to 31 March 2025 a total of 161,749 changes were processed compared
to 119,698 for the previous financial year; an increase of 35.13%. 
Discretionary Housing Payments (DHP) 
2.12  From 1 April 2017 funding for DHP has been devolved to Scottish Government. This
funding supports both the Scottish Government’s commitment to fully fund the
implications of the Bedroom Tax and an additional sum available for other reasons
such as the Benefit cap and the restrictions on Local Housing Allowance rates. 
2.13 From 1 January 2023 the Scottish Government is fully funding the implications of
mitigating the benefit cap. This was announced as part of the tackling child poverty
delivery plan ‘Best Start, Bright Futures’ in March 2022. Local authority Leaders have
agreed to fuller benefit cap mitigation through the DHP scheme from 1st January 2023.
For 2024/25 the Scottish Government has provided ring-fenced funding of £0.436m to
mitigate the benefit cap.  As at 31 March, the amount paid and committed in respect of
the benefit cap was £0.101m (23%). 
2.14 As at 31 March 2025 the total paid and committed in respect of Bedroom Tax was
£6.100m. In comparison, this sum was £5.805m at the same point during 2023/24. 
2.15 In addition the Council also receives £0.459m in respect of non-bedroom tax related
issues. An additional £0.051m has been received for 2024/25 due to a redistribution of
collective unused funds for 2023/24 bringing the total budget to £0.511m. As at 31
March 2025 £0.502m (98.3%) has been paid or committed from the fund. 
2.16 As in previous years, the Service will continue to liaise with colleagues in Housing and
Housing Associations to encourage applications to the fund. In addition, the Service
will also liaise with Universal Credit claimants affected by the benefit cap who could
possibly be eligible for the mitigation. 
Scottish Welfare Fund 
2.17 The Council has administered the Scottish Government’s Scottish Welfare Fund
(SWF) since 1 April 2016. 
2.18 The Scottish Government provides an annual award budget of £2.760m to North
Lanarkshire Council. In December, the Scottish Government confirmed additional one-
off funding for the SWF. North Lanarkshire’s share of that additionality is £1.361m with
a further £0.194m to support increased administration costs. 
2.19 As indicated in the last update to Committee, the Council has continued to assess
applications at High priority. This means that applications will only be considered where
there is immediate and severe need, applicants are highly vulnerable, where there will
be significantly adverse impacts to health and wellbeing with a no grant award, and
where the effect of the grant is immediate and substantial. Staff assessing Scottish
Welfare Fund applications are highly trained in making these judgements in
accordance with the statutory guidance and where an application is unsuccessful they
will signpost the applicant to other community-based supports. 
2.20 There are two grant schemes and their relative performance during 2024/25 and prior
year comparison is as follows: 
Page 180 of 276

Page 181

2024/25 
Applications
Assessed
Awards Unsuccessful
Applications
Acceptance
Rate
Crisis Grants 19,942 14,312 5,630 71.8%
Community Care
Grants
5,466 3,746 1,720 68.5%
Total 25,408 18,058 7,350 71.1% 
2023/24 
Applications
Assessed
Awards Unsuccessful
Applications
Acceptance
Rate
Crisis Grants 21,558 15,279 6,279 70.9%
Community Care
Grants
6,488 4,737 1,751 73.0%
Total 28,046 20,016 8,030 71.4% 
2.21 As at 31 March 2025, the total financial value of grants paid from the Scottish Welfare
Fund amounted to £3.4m, which represents 82.5% of the total revised budget for the
current financial year.  The underspend of £0.720m will be carried forward for use in
2025/26. 
2.22 During 2024/25, the Scottish Welfare Fund has seen a decrease in demand for Crisis
applications of 7.5% and a decrease in demand for Community Care Grant applications
of 15.75%. These reductions in demand should be considered in the context of
historically high applications numbers experienced during 2023/24. The slightly lower
acceptance rates are reflective of the move to High priority levels for the current
financial year meaning a number of residents have not been eligible for support. For
2025/26 financial year, Scottish Welfare Fund applications will continue to be assessed
at High priority. 
2.23 The Service strives to assess applications within the timescales outlined within Scottish
Government guidance. Throughout the period the Service has largely continued to
assess Crisis applications within the two working day time limit.  Whilst it has been
more challenging throughout the last year to meet the 15 working day time limit for
Community Care Grants, the Service is currently assessing such applications within
that timeframe and continues to Fastrack applications linked to homelessness
supporting the wider Rapid Rehousing and Homes First strategies. 
Clothing Grants and Free School Meals 
2.24 The Finance Service administers Clothing Grant payments and applications for Free
School Meals on behalf of the Council for families meeting low-income eligibility
criteria. 
2.25 Up to 31 March 2025 the Service administered and paid out 11,895 Clothing Grants
compared to 11,864 by the end of March 2024. 
2.26 The Service awarded 10,617 Free School Meal applications to 31 March 2025
compared to 10,401 to the same period in 2024. 
2.27 From 20 February 2025, Free School Meal eligibility has been expanded to include P6
and P7 pupils eligible for the Scottish Child Payment. The Council’s online form has
been updated to reflect the updated eligibility criteria and a social media campaign has
been ongoing to ensure parents and carers are aware of the expansion of the scheme. 
Page 181 of 276

Page 182

Blue Badges 
2.28 The Finance Service administers the Blue Badge scheme in accordance with Scottish
Government guidance. The eligibility criteria means that some are automatically
entitled to a Blue Badge. In other cases, the Council assesses an individual’s eligibility
which may include the requirement for a mobility assessment and meeting a healthcare
professional. 
2.29 As at 31 March 2025, the Service administered 11,715 Blue Badge applications with
10,514 awarded (89.75% award rate). Over the same period in the 2023/24 financial
year the Service administered 10,287 applications with 8,619 awarded (83.7% award
rate). 
2.30 Scottish Government guidance states that applicants should receive a decision on their
application in around 12 weeks. The Council is currently reaching a decision within 4
weeks. 
3. Measures of success 
3.1  Continuous improvement in processing and collection rates.   
4. Supporting documentation 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 182 of 276

Page 183

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 183 of 276

Page 184

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
The Service has been liaising with Business and Digital on the Landlord Portal and
RPA developments and these will be managed in line with Business and Digital’s
available resources. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC).  
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 184 of 276

Page 185

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/KS/FC/DC Date 21/05/25 
Revenue Monitoring Report Council Summary
1 April 2024 to 28 February 2025 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 07583 010692 
Executive Summary
This report updates on the overall financial position for the General Fund Account, Housing
Revenue Account and Adult Health and Social Care, for the financial year to 31 March
2025.  The report consolidates the budget monitoring position of all Services, highlighting
and explaining major variances as per the Council’s approved Financial Regulations. 
The Council approved its General Fund Revenue Budget on 15 February 2024.  Following
notification from Scottish Government of further funding made available to local authorities
the overall budget is now £1,008.920m.  A surplus of £7.080m is currently projected, largely
due to the reported position on loan charges and interest earned on revenue balances. 
This surplus is to support future budget challenges in accordance with the approved
reserves policy, and any budget smoothing strategy recommended by the S95 Officer. 
The 2024/25 budget incorporates £21.667m of net savings. It is projected that £20.189m
of the savings (93%) will be delivered within the financial year, with replacement savings
of £1.478m identified to fully address the shortfall. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the financial position of the 2024/25 revenue budget; and 
(2) Otherwise endorse the contents of this report.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 9
Page 185 of 276

Page 186

1. Background 
1.1 The Council’s approved Financial Regulations require services to remain within their
approved budgetary provision, and to report all significant deviations - defined as the
higher of £100,000 or 5% - within their budget monitoring reports.  Where significant
deviations are identified, services must provide explanatory commentary, outline the
action required to rectify such deviations and where relevant, must also highlight the
impact this has on other budget headings. 
2. Report 
2.1 At its meeting of 15 February 2024, the Council approved a General Fund Revenue
Budget of £1,016.750m including expenditure budgets which will be offset by ring
fenced grant resources of £15.290m, resulting in a net expenditure position for
monitoring purposes of £1,001.460m.  Additional funding has since been confirmed as
part of the Scottish Government budget setting, resulting in an overall total budget of
£1,008.920m. It should be noted that this overall budget also reflects the transfer of
£20.000m of funding from Revenue to Capital linked to Scottish Government funding
towards pay award. Further details of this are provided in paragraph 2.12 below. 
2.2 Following the budget setting in February 2024 the Council has an approved savings
target of £21.667m for 2024/25.  Further detail can be found in Section 2.13 below. 
2.3 Table 1 below summarises the projected income and expenditure position, which
illustrates a projected surplus of £7.080m, which will be available to support future
budget challenges in accordance with the approved reserves policy, and any budget
strategy recommended by the S95 Officer. 
Annual 
Budget
(£m)
Projected
Outturn
(£m)
P12
Variance
(£m)
P10
Variance
(£m)
P10 to P12
Movement
(£m)
Expenditure     
Total Expenditure 1,008.920 1,001.840 7.080 6.830 0.250
Income     
Aggregate External Finance   835.719   835.719 - - -
Local Tax Collection   168.999   168.999 - - -
Use of Balance   4.202 4.202 - - -      
Total Income 1,008.920 1,008.920 - - -
Forecast Surplus/ (Deficit): to
support future budgets
- 7.080 7.080 6.830 0.250
Table 1  
Page 186 of 276

Page 187

Analysis of Significant Variations
2.4 Table 2 below illustrates the projected outturn financial position of services:
Service P12 Outturn
(£m)
P10 Outturn
(£m)
P10 to P12
Movement
(£m)
Education, Children and Families - On Budget - On Budget -
Enterprise and Communities - On Budget - On Budget -
Chief Executives and Other
Corporate Services 3.065 Underspend 2.815 Underspend 0.250
Social Work (Non-Integrated) - On Budget - On Budget -
Executive Services Total 3.065 Underspend 2.815 Underspend 0.250
Financing Costs 3.000 Over recovery 3.000 Over recovery -
Other Budgetary Issues 1.015 Underspend 1.015 On Budget -
Forecast Surplus/ (deficit): to
support future budgets 7.080 Underspend 6.830 Underspend 0.250
Table 2 
2.5  Education, Children and Families is reporting an overall breakeven position.  However, 
it should be noted that there are a number of compensating variances within this 
position. Underspends are projected within employee costs of £0.516m reflecting 
actual and projected vacancies, along with the roll out of finalised HQ, cluster, and 
school staffing structures, £0.554m in other costs primarily linked to external grant 
synergies aligned to music provision and external company payments within 
employability, £0.822m underspend in supplies and services due to various 
compensatory factors across the service, and Payments to other bodies underspends 
of £0.693m mainly due to family placements payments. These underspends are offset 
by overspends in transport costs of £2.192m in relation to ‘Home to School’ transport 
pressures linked to ASN and Gaelic provision, together with a forecast under-recovery 
in income of £0.463m primarily in relation to reduced cross-boundary ASN placements 
within NLC settings. 
2.6 Enterprise and Communities continue to report a projected breakeven position, with a
number of compensatory variances contributing to this overall position. Employee costs
are forecast to underspend by £4.585m as a result of vacancy savings partially offset
by increased overtime and turnover, together with an underspend of £0.761m in
administration costs due to grant income linked to free school meals received in
advance of need, partially offset by increased external advisor costs as a result of
vacancies. These underspends are offset by overspends in payments to other bodies
of £1.875m, primarily as a result of increased costs in relation to the finalisation of the
previous roads contract and the mobilisation of the new contract and increased agency
and sub-contractor costs, £1.943m in supplies and services of primarily in relation to
ICT costs, food provisions and sub-contracted work. In addition, income is projected to
under-recover by £1.304m due to lower than anticipated income from Active NL
membership Fees and Leisure pay as you go income, net Culture ticket sales and
reduced building control and waste sales income. 
2.7 Chief Executives and Other Corporate Services is reporting a projected underspend of
£3.065m, primarily as a result of employee cost savings across the service totalling
£1.929m linked to vacancies, and an underspend of £1.273m within supplies and
services resulting from the current usage levels of cloud-based systems.
Page 187 of 276

Page 188

2.8 In respect of loan charges and interest earned on revenue balances, as previously
advised, due to significant uncertainty and volatility within market conditions, and other
variables, there is a risk of movement in the level of net financing costs expected in the
current financial year.  Following further consideration and updating of a number of
factors, including latest projections on profiled capital expenditure, further refining of
interest on revenue balances modelling and interest rates observed, £3.000m of the
overall forecast net over recovery on budget is reported. Committee should note that
some of the factors contributing to the overall financing costs position are purely timing,
therefore, it is prudent to ensure the funding to manage these elements is earmarked
in line with the overall longer term funding strategy for loan charges and interest on
revenue balances.  The final position in this respect will be kept under review and
reported as part of the year end process. 
2.9 In addition, there is a further underspend of £1.015m mainly in respect of additional
Scottish Government funding for costs which are being partly met by other budgetary
provision. 
2.10 Committee are also advised that the budget for both council tax income and council tax
reduction (CTR) are monitored on an ongoing basis. This includes consideration of
council tax collection, CTR uptake and household numbers. In addition, an assessment
of expected credit losses will be required.  At this point in the financial year the Council
Tax product is expected to be on budget with the position being finalised as the Council
completes the annual accounts process. 
2.11 The 2024/25 pay awards have now been agreed with the settlement for teachers being
an uplift of 4.27%, and for non-teachers an uplift of 3.6% or £0.67 per hour, whichever
is greater. The full implications have been incorporated into the monitoring position
reported by each Service. 
2.12 It should also be noted that Scottish Government has confirmed that £53.000m of their
funding towards local government pay will be made through capital funding for 2024/25.
In line with recent years, the Council has been asked to absorb a proportion of the
capital funding in lieu of revenue funding.  As a result, the reported net budget illustrated
in appendix 1 has been reduced by £20.000m, with a corresponding increase in
General Capital Grant. Local Government Finance Circular 9/2024 provides a
temporary amendment to the statutory accounting requirements for capital grant which
allows the necessary flexibilities in accounting such that the grant can be used to offset
the revenue pressures linked to pay award, thus ensuring this transfer does not have
a negative impact on the Council’s overall revenue position. 
2024/25 Budget Savings 
2.13 As outlined in paragraph 2.2 above, the Council has approved net savings of £21.667m
for 2024/25.  Each Service reports on the achievement of their savings within the
relevant service monitoring report.  It is projected that £20.189m of savings (93%) will
be achieved in the current year, with the in-year gap of £1.478m being fully mitigated
by replacement savings. 
Earmarked Reserves and Change Management Fund 
2.14 The Council’s audited annual accounts highlight a General Fund reserve balance of
£283.893m.  This balance includes £8.000m for the Contingency Fund, with a further
£245.690m earmarked for specific future commitments including £19.358m allocated
to the Change Management Fund to support one off costs of approved savings and to
Page 188 of 276

Page 189

ensure the Council has a resilient and sustainable financial plan. The remaining
£30.203m of funds represent balances that were not earmarked as at 31 March 2024
and have therefore been set aside to support future budget strategies. 
2.15 A total of £91.161m of earmarked reserves is profiled for use in 2024/25 with a further
£154.529m profiled for use in future years. It is currently projected that £53.895m will
be spent during this financial year with £191.768m anticipated to be required in future
years, and £0.027m no longer required. A summary position is shown in Appendix 2. 
Taking into account the projected forecast surplus of £7.080m, and the drawdown of
historic balances from the Capital Fund of £2.951m, it is expected that at the end of the
financial year the General Fund will include non-earmarked balances of £40.261m as
detailed in Appendix 3.  These balances are to support future budget challenges in
accordance with the approved reserves policy, and any budget smoothing strategy
recommended by the S95 Officer. 
Risks and Uncertainty 
2.16 All activities undertaken by the Council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy, Services manage these as part of their
overall corporate and service planning processes.  The current economic climate and
pay and non-pay inflation continuing at historically high levels, are some of the key
factors that have the potential to impact upon the Council’s ability to provide quality
services within approved budget levels. 
Housing Revenue Account 
2.17 The Housing Revenue Account is currently projecting an underspend of £0.835m for
the financial year. This position is primarily as a result of underspends in repairs costs
of £1.202m, electricity of £0.200m, a reduction in expected future credit losses required
of £0.700m, and an underspend within other costs of £0.419m linked to contingency
sums not required within 2024/25, partially offset by awards for Universal Credit
Assistance Fund applications to support tenants transitioning to Universal Credit.
These underspends are partially offset by an under-recovery of £0.423m for
mainstream rent collection, an overspend reported within payments to other bodies to
recognise the decision taken by the Housing Committee to use £1.233m of the current
year surplus for the provision of grant to owners in multi tenure blocks where RAAC
has been confirmed, and work will be required.  The service anticipates that £1.165m
of savings (100%) will be delivered by year end. 
Adult Health and Social Care 
2.18 Council Adult Health and Social Care provision to the Integration Joint Board (IJB) is
projecting an underspend of £3.778m.  This position is primarily due to a projected net
underspend in employee costs of £6.561m mainly as a result of non-recurring reduction
of employer’s superannuation costs coupled with slippage in recruitment, partially offset
by higher than anticipated costs in relation to home support staffing costs.  There is
also an underspend in supplies and services of £0.366m mainly as a result of lower
than anticipated spend in equipment and adaptations, and an over-recovery in income
of £0.473m primarily linked to increased spend on Care of Gardens and Adaptations
which are met by contributions from housing, and recently received ‘Winter Planning’
funding, offsetting expenditure incurred. These favourable variances are partly offset
by a projected overspend of £3.166m in payments to other bodies and transfer
payments primarily in relation to anticipated spend in ‘Care at Home’ and Independent
Care Homes, higher than anticipated transport and plant costs of £0.362m mainly in
relation to higher than anticipated running costs associated with vehicles for use across
Page 189 of 276

Page 190

the Service, and an overspend in property costs of £0.352m predominantly due to
higher than anticipated spend on Care of Gardens and Adaptations which is offset by
increased income as noted above.  It should be noted that the reduction in pension cost
is part of the delivery plan solution to manage an overall recurring cost pressure of
£11.400m over 2024/25 and 2025/26. 
3. Measures of success 
3.1 The Council continues to operate within approved budgeted resources.   
4. Supporting documentation 
Appendix 1 Summary by Division
Appendix 2 Anticipated Commitments – Earmarked Reserves
Appendix 3 Availability of One-Off Funds – Change Management Fund 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 190 of 276

Page 191

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 191 of 276

Page 192

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 192 of 276

Page 193

LINE SERVICE  ACCOUNT ANNUAL PROVISIONAL
NO. BUDGET OUTTURN
(1) (2) (3) (4)
£      £      £     
1 Education, Children & Families 535,981,477               535,981,477              -                            
2 Early Years 31,417,926                31,417,926                -                            
3 Primary Schools 147,761,754               147,761,754              -                            
4 Secondary Schools 133,474,732               133,474,732              -                            
5 Special Schools 26,779,053                26,779,053                -                            
6 Education & Families Service Delivery 145,397,572               147,788,873              (2,391,301 )              
7 Childrens Services Social Work 40,648,864                38,818,993                1,829,871               
8 Justice Services 91,691                       (414,847 )                   506,538                  
10 Employability 3,014,911                  2,766,524                  248,387                  
11 Community Learning 5,393,020                  5,518,798                  (125,778 )                 
12 Tackling Poverty 2,001,954                  2,069,671                  (67,717 )                  
13 Enterprise & Communities 206,394,701               206,394,701              -                            
14 Assets & Procurement 37,435,179                37,559,464                (124,285 )                 
15 Trading Accounts (462,202 )                    (92,197 )                     (370,005 )                 
16 Community Operations 152,387,643               154,578,966              (2,191,323 )              
17 Housing Management 5,725,566                  3,889,811                  1,835,755               
18 Place 11,308,515                10,458,657                849,858                  
19 Chief Executives & Other Corporate Services 109,906,848               106,841,521              3,065,327               
20 Directorate & Support 529,177                     562,005                     (32,828 )                  
21 Finance 47,098,042                45,645,039                1,453,003               
22 Audit & Risk 597,041                     593,673                     3,368                     
23 Legal & Democratic 2,579,482                  2,303,309                  276,173                  
24 Business & Digital 23,484,284                21,722,647                1,761,637               
25 People Resources 8,933,567                  8,847,471                  86,096                    
26 Strategic Communication and Engagement 5,396,368                  5,376,105                  20,263                    
27 Other Corporate Services 6,284,817                  6,787,202                  (502,385 )                 
28 Joint Boards 15,004,070                15,004,070                -                            
29 Social Work (non Integrated) 211,469,816               211,469,816              -                            
30 GENERAL FUND SERVICES 1,063,752,842            1,060,687,515           3,065,327               
31 FINANCING COSTS (36,205,584 )               (39,205,584 )               3,000,000               
32 Reversal of Capital Charge (87,964,980 )               (87,964,980 )               -                            
33 Loan Charges and Interest on Revenue Balances 51,759,396                48,759,396                3,000,000               
34 OTHER BUDGETARY ISSUES (18,627,005 )               (19,641,817 )               1,014,812               
35 Assumptions not yet Realised 1,372,995                  358,183                     1,014,812               
37 Transfer from capital grant (Pay Award) (20,000,000 )               (20,000,000 )               -                            
38 TOTAL EXPENDITURE 1,008,920,253            1,001,840,114           7,080,139               
39 SOURCES OF FUNDING 1,008,920,253            1,008,920,253           -                            
40 Aggregate External Finance 834,374,788               834,374,788              -                            
41 Council Tax 168,999,465               168,999,465              -                            
42 Use of balances 5,546,000                  5,546,000                  -                            
43 FORECAST (SURPLUS)/DEFICIT: TO SUPPORT FUTURE
BUDGETS
-                                (7,080,139 )                 7,080,139               
44 HOUSING REVENUE ACCOUNT (SURPLUS) / DEFICIT -                                (835,000 )                   835,000                  
45 ADULT HEALTH AND SOCIAL CARE (SURPLUS) /DEFICIT -                                (3,778,184 )                 3,778,184               
Appendix  1
NORTH  LANARKSHIRE COUNCIL
SUMMARY BY DIVISION FOR PERIOD ENDING 28 February 2025 (PERIOD 12)
PROVISIONAL
VARIANCES
Page 193 of 276

Page 194

Appendix 2
2024/25 Future Years Total
Opening
Reserve
Balances 
2024/25
Revised
Earmarked
Reserve 
24/25
Projected
Spend 
Anticipated
Year End
Balance 
Anticipated
Future Year
Use 
No Longer
Required 
Profiled for
Future Years 
Anticipated
Future Year Use 
No Longer
Required 
No Longer
Required
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000 Check Future Years
Change Management Fund 19,358         3,230           3,230         -                  -                  -               16,128               16,128               -               -                   16,128        -          
Earmarked & One Off Resources
Schools Future Contractual Obligations 60,969         -                  -                -                  -                  -               60,969               60,969               -               -                   60,969        -          
Strategic Workforce Planning 17,902         17,902          3,886         14,016         14,016         -               -                       -                       -               -                   -             -          
Temporary Teachers 823             823              823            -                  -                  -               -                       -                       -               -                   -             -          
Temporary Accommodation 8,038           8,038           -                8,038           8,038           -               -                       -                       -               -                   -             -          
Early Years & Childcare Expansion 5,213           3,332           3,332         -                  -                  -               1,881                1,881                -               -                   1,881          -          
Refugee Resettlement Programmes 8,323           3,276           3,086         190              190              -               5,047                5,047                -               -                   5,047          -          
Loans Charges 17,905         -                  -                -                  -                  -               17,905               17,905               -               -                   17,905        -          
Unmanaged burdens within Education, Children & Families 4,234           4,234           1,434         2,800           2,800           -               -                       -                       -               -                   -             -          
Pupil Equity Fund 2,153           2,153           2,153         -                  -                  -               -                       -                       -               -                   -             -          
Balances held by Schools under Devolved School Management 2,655           2,655           2,655         -                  -                  -               -                       -                       -                                  - -             -          
Economic Recovery 1,519           1,419           1,319         100              100              -               100                   100                   -               -                   100             -          
Whole Family Wellbeing 4,417           2,071           1,471         600              600              -               2,346                2,346                -               -                   2,346          -          
Winter Reserve 1,500           1,500           1,500         -                  -                  -               -                       -                       -               -                   -             -          
Business Gateway and Business Recovery 1,697           822              822            -                  -                  -               875                   875                   -               -                   875             -          
Strategic Capital Investment Programme 44,800         -                  -                -                  -                  -               44,800               44,800               -               -                   44,800        -          
One Workforce Grading Pressures 5,000           5,000           -                5,000           5,000           -               -                       -                       -               -                   -             -          
Digital NL 1,222           1,222           1,222         -                  -                  -               -                       -                       -               -                   -             -          
Mobilisation of Strategic Contracts 2,177           2,177           2,177         -                  -                  -               -                       -                       -               -                   -             -          
Shared prosperity Grants 1,753           1,753           1,753         -                  -                  -               -                       -                       -               -                   -             -          
Teacher Induction Scheme Support 1,302           1,302           207            1,095           1,095           -               -                       -                       -               -                   -             -          
Budget One-off Investment 8,119           8,119           6,901         1,218           1,218           -               -                       -                       -               -                   -             -          
Other Earmarked Funds 24,611         20,133          15,924       4,209           4,182           27            4,478                4,478                -               27                 4,478          -          
Earmarked & One Off Resources Total 226,332       87,931          50,665       37,266         37,239         27            138,401             138,401             -               27                 138,401      -          
Total Reserves 245,690       91,161          53,895       37,266         37,239         27            154,529             154,529             -           27                 154,529      -          
Contingency Reserve 8,000          
Non-Earmarked Balance; to support future budget challenges 30,203        
General Fund Surplus at 31 March 2024 283,893      
ANTICIPATED COMMITMENTS AGAINST EARMARKED RESERVES AS AT 28 February 2025 (PERIOD 12)
NORTH LANARKSHIRE COUNCIL
Page 194 of 276

Page 195

Appendix 3
£000 £000
Total Balance B/f per 2023/24 Annual Accounts 19,358 30,203
Period 10 reported variance 7,080
Earmarked Reserves no longer required 27
Total Balance 2024/25 before commitments 19,358 37,310
Revised one - off costs of approved savings (3,230)
Draw down from Capital Fund 2,951
Total Balance 2024/25;  to support future budget challenges 16,128 40,261
Known Commitments :- Revised one - off costs of approved savings (2,774)
Forecast Balance;  to support future budget challenges 13,354 40,261
NORTH  LANARKSHIRE COUNCIL
AVAILABILITY OF GENERAL FUND BALANCES AS AT 28 February 2025 (PERIOD 12)
Change Management
Fund
Non-Earmarked
General Fund
Page 195 of 276

Page 196

Page 196 of 276

Page 197

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/PH/PF Date 21/05/25 
Revenue Budget Monitoring Report; Chief Executive’s Service
01.04.24 – 28.02.25 (Period 12) 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 01698 302408 
Executive Summary
This report provides a summary of the Chief Executive’s Service financial performance for
the period 1 April 2024 to 28 February 2025 (Period 12).  The report illustrates the
provisional outturn as at 31 March 2025, with major outturn variances highlighted and
explained per the Council’s approved Financial Regulations. 
The Council approved its General Fund Revenue Budget on 15 February 2024, of which
£109.907m currently represents the net revenue budget for the Chief Executive’s Service.   
Incorporated within the revenue budget are approved service savings totalling £1.707m.   
The Service is currently projecting a year-end underspend of £3.065m for the financial year
predominately as a result of employee vacancies and underspends relating to ICT
contracts. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the financial position of the 2024/25 Chief Executive’s Service revenue
budget.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 10
Page 197 of 276

Page 198

1. Background 
1.1 The Council’s approved Financial Regulations require the Chief Executive to remain
within the approved budgetary provision, and to report all significant deviations -
defined as the higher of £100,000 or 5% - within budget monitoring reports. Where
significant deviations are identified, the Chief Executive must provide explanatory
commentary, outline the action required to rectify such deviations and where relevant,
must also highlight the impact this has on other budget headings. 
2. Report 
Summary of Financial Position 
2.1 The Council approved its General Fund Revenue Budget on 15 February 2024, of
which £104.746m (10.38%) represented the approved Revenue Budget for the Chief
Executive’s Service. Additional SG grant funding for Scottish Welfare Fund, Pay Award
uplifts and in-year transfers from Education, Children and Families results in a revised
budget of £109.907m. 
2.2 The overall projected outturn position of the Service is a year-end underspend of
£3.065m.  Appendices one to five provide further information in respect of this position. 
2.3 As at Period 12 the position on Council Tax Reduction Scheme remains under review
along with other elements of the Council Tax Product including household numbers and
council tax collection for the year.  The Council Tax Product will then be assessed for
expected credit losses as part of the year end process. It is currently anticipated there
will be no material variance overall.   
2.4 The 2024/25 budget incorporates £1.707m of savings which are listed in Appendix 5.  
Of this, £1.027m relates to service specific savings approved by Council in February
and these have been fully delivered through service restructures and a reduction in
operational budgets.  Furthermore, the historic underspend savings target of £0.680m
has also been fully achieved across the service. 
Analysis of Significant Variances 
2.5 The service currently anticipates a projected underspend of £1.929m within Employee
costs as a result of actual and projected vacancies to 31 March 2025.   
2.6 Costs in relation to the annual insurance premium coupled with building costs relating
to the Civic Centre has resulted in a projected overspend of £0.138m within Property
Costs. 
2.7 Within Supplies and Services the service is projecting a year end underspend of
£1.273m which represents savings within Business and Digital resulting from the
current usage levels of cloud-based systems. 
2.8 Transport & Plant is projected to underspend by £0.046m due to reduced travel claims
following the implementation of hybrid working and MOT plating. 
2.9 The service is now anticipating an underspend of £0.145m within Administration Costs
predominately due to lower than anticipated expected credit losses, training and
advertising costs partially offset by increased costs for insurance premiums, legal fees
as a result of the level of Solicitor vacancies meaning external advice is required,
consultant fees and postages.
Page 198 of 276

Page 199

2.10 An income under-recovery of £0.126m is projected predominately attributable to a
forecast reduction in PPP contributions and lower than budgeted recoveries from legal
insurance, licensing and registrars partially offset by over-recoveries within rental
allowances / rent rebates overpayments, additional statutory charges for Council Tax
and Non-Domestic Rates and interest. 
2.11 There are various minor variances across other budget areas resulting in the Service
forecasting a year-end underspend of £3.065m as at 31 March 2025. 
Earmarked and One-off Reserves 
2.12 In finalising the Council’s draft accounts to 31 March 2024, the service was given
approval to earmark £3.567m of resources to fund key projects and initiatives profiled
over a number of years.  It is anticipated that £2.297m of the reserves balances will be
utilised in 2024/25 with £1.248m required for future years and a balance of £0.022m to
be returned to reserves.  Details of the Service’s earmarked funds are provided in
Appendix 4.    
2.13 The Service has also been given approval to utilise £1.059m of funds from the
Corporate Strategic Workforce Planning Reserve over a number of years.  It is
anticipated £0.195m of this reserve will be utilised in 2024/25 with actual spend of
£0.148m at P12.  These funds are not included in the Service outturn position. 
2.14 The Service was further given approval to utilise £0.296m of funds from the Change
Management Fund over several years.  It is anticipated that £0.043m will be utilised in
2024/25 with actual spend of £0.032m at P12.  These funds are not included in the
Service outturn position. 
2.15 The Service has incurred £0.688m VRS costs relating to approved
savings/restructures.  Therefore, there is a requirement to utilise the Corporate Change
Management fund at this time.  Any further costs arising will be reported in future
reports as they are incurred.  These costs are not included in the Service outturn
position. 
2024/25 Budget Savings 
2.16 The Council approved service savings of £1.707m savings of which £1.707m have
been fully delivered as at Period 12.  Further information regarding savings is included
in Appendix 5. 
Management Actions 
2.17 The Service is being pro-active to ensure expenditure is contained within its approved
2024/25 budget. 
3. Measures of success 
3.1  The Service continues to operate within approved budget resources.   
4. Supporting documentation 
4.1 Appendix 1 Objective Summary
4.2 Appendix 2 Subjective Summary
4.3 Appendix 3 Payments to Other Bodies
Page 199 of 276

Page 200

4.4 Appendix 4 Earmarked Reserves
4.5 Appendix 5 Budget Savings 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 200 of 276

Page 201

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
As stated in the main body of the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 201 of 276

Page 202

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All activities undertaken by the Council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy, Services manage these as part of
their overall corporate and service planning processes. The current economic
climate, in particular, has the potential to impact upon the Council’s ability to provide
quality services within approved budget levels. 
To minimise risk, this report has been prepared by service based Finance
personnel in consultation with budget managers, in accordance with the Financial
Regulations. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 202 of 276

Page 203

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 203 of 276

Page 204

APPENDIX 1
[1] [2] [3] [5] [6] [7]
DIRECTORATE & SUPPORT 529,177 562,005 (32,828) ADV (6.2%) (45) Overspend in legal fees as a result of seeking external advice due to
solicitor vacancies.
FINANCE 47,098,042 45,645,039 1,453,003 FAV 3.1% 367,485
Underspends due to vacancies and an over-recovery in income
relating to rent allowances / rent rebates overpayments, blue badges
and Government grants offset by projected overspends in insurance
premiums and postages.
AUDIT & RISK 597,041 593,673 3,368 FAV 0.6% 2,742 Underspends due to vacancies.
LEGAL & DEMOCRATIC
SOLUTIONS 2,579,482 2,303,309 276,173 FAV 10.7% 1,744
Underspends within employee costs, photocopying and postages
offset by an under-recovery in income in relation to insurance,
photocopying, registrars and licensing income.
BUSINESS & DIGITAL 23,484,284 21,722,647 1,761,637 FAV 7.5% (174,570) Underspends within ICT contracts linked to the timing of costs
associated with cloud based systems and vacancies.
PEOPLE RESOURCES 8,933,567 8,847,471 86,096 FAV 1.0% 28,339 Underspends within employee costs and training budgets are offset
by increased medical fees.
STRATEGIC COMMUNICATIONS 5,396,368 5,376,105 20,263 FAV 0.4% 4,263 Underspends within employee costs and administration costs are
offset by turnover.
OTHER COPORATE SERVICES 6,284,817 6,787,202 (502,385) ADV (8.0%) 19,866
Under-recovery in income within PPP Contributions coupled with
projected costs for byelections offset by underspendsfor NLP
Financial Guarantee and interest received.
JOINT BOARDS 15,004,071 15,004,071 0 0.0% 0 Balanced budget.
NET EXPENDITURE 109,906,849 106,841,523 3,065,327 FAV 2.8% 249,824
[4]
PERIOD
MOVEMENT ANALYSIS
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Objective Analysis
Period 12 (01 April 2024 - 28 February 2025)
A - Chief Executives Service
DIVISION OF SERVICE ANNUAL BUDGET PROJECTED
OUTTURN
PROJECTED OUTTURN
VARIANCE %
Page 204 of 276

Page 205

APPENDIX 2
[1] [2] [3] [5] [6] [7]
EMPLOYEE COSTS 43,703,104 41,773,970 1,929,134 FAV 4.4% 340,169 Underspends due to vacancies partially offset by overtime costs.
PROPERTY COSTS 1,847,739 1,986,188 (138,449) ADV (7.5%) 16,906 Assumed increased costs relating to the insurance premium coupled
with part year building costs relating to the Civic Centre.
SUPPLIES & SERVICES 10,703,627 9,430,606 1,273,022 FAV 11.9% (155,813) Underspends within ICT contracts linked to the timing of costs
associated with cloud based systems
TRANSPORT & PLANT 842,483 795,988 46,495 FAV 5.5% 4,435 Underspends within travel expenses due to hyrbrid working and MOT
plating.
ADMINISTRATION COSTS 8,291,447 8,146,320 145,127 FAV 1.8% 123,330
Assumed expected credit losses, training and advertising costs are
offset by insurance premium increase, legal fees as a result of using
external advice due to the level of internal vacancies and postages.
PAYMENTS TO OTHER BODIES 18,500,499 18,533,787 (33,287) ADV (0.2%) (45,961) Projected costs associated with by-elections and medical fees offset 
by agency fees.
TRANSFER PAYMENTS 108,757,069 108,757,069 0 0.0% 0
CAPITAL FINANCING COSTS 6,812,218 6,742,994 69,224 FAV 1.0% 0 Over-recovery of income re NLP Financial Guarantee.
REVENUE FINANCING COSTS 0 0 0 0.0% 0
OTHER EXPENDITURE 5,619,314 5,719,094 (99,780) ADV (1.8%) (86,059) Miscellaneous costs associated with the purchase of Cumbernauld
Shopping Centre.
TOTAL EXPENDITURE 205,077,500 201,886,015 3,191,486 FAV 1.6% 197,007
INCOME (95,170,651) (95,044,493) (126,159) ADV 0.1% 52,817
Under-recovery in income within PPP Contributions, insurance,
photocopying and registrars offset by over-recoveries for Rent
Allowances / Rent Rebates Overpayments, Additional Statutory
Charges and interest.
NET EXPENDITURE 109,906,849 106,841,523 3,065,327 FAV 2.8% 249,824
[4]
PERIOD
MOVEMENT ANALYSIS
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Subjective Analysis
Period 12 (01 April 2024 - 28 February 2025)
A - Chief Executives Service
CATEGORY ANNUAL BUDGET PROJECTED
OUTTURN
PROJECTED OUTTURN
VARIANCE %
Page 205 of 276

Page 206

APPENDIX 3
[1] [2] [3] [5] [6] [7]
PAYMENTS TO OTHER BODIES GENERAL 669,336 711,715 (42,379) ADV (6.3%) (32,379) Projected costs associated with by-elections.
MEDICAL FEES 10,722 41,592 (30,870) ADV (287.9%) (17,917) Increased costs in relation to medical fees.
AGENCY FEES 79,847 53,346 26,501 FAV 33.2% (3,499) Lower than anticipated costs within Agency Fees.
TOWN TWINNING 0 0 0 0.0% 0
CHILDRENS PANEL 24,972 20,958 4,014 FAV 16.1% 14 Minor variance 
COSLA ANNUAL LEVY 195,000 193,434 1,566 FAV 0.8% 0
COMMUNITY COUNCIL GRANTS 125,222 121,222 4,000 FAV 3.2% 4,000 Minor variance 
GRANTS TO ORGANISATIONS 987,294 987,294 0 0.0% 0
EXTERNAL AUDIT FEE 679,389 643,986 35,403 FAV 5.2% 35,403 Lower than anticipated costs.
ELECTION PROVISION 0 0 0 0.0% 0
TOURISM - VISIT NORTH LANARKSHIRE 84,837 84,837 0 0.0% 0
SCOTTISH WELFARE FUND 4,120,844 4,120,844 0 0.0% 0
SUB-CONTRACTOR PAYMENTS 1,869 1,809 60 FAV 3.2% 0 Minor variance 
LOCAL TAX PAYPOINT COMMISSION 35,000 31,179 3,821 FAV 10.9% 3,821 Minor variance 
COSLA MIGRATION SCOTLAND 200,000 200,000 0 0.0% 0
LANDS VALUATION CONTRIBUTION 1,814,004 1,814,004 0 0.0% 0
SPT CONTRIBUTION 5,481,746 5,481,746 0 0.0% 0
SPT CONCESSIONARY FARES CONTRIBUTION 569,805 569,805 0 0.0% 0
CUSTOMER FIRST CONTRIBUTION 4,100,000 4,100,000 0 0.0% 0
TOTAL EXPENDITURE 19,179,887 19,177,772 2,116 FAV 0.0% (10,557)
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Payments to Other Bodies
Period 12 (01 April 2024 - 28 February 2025)
A - Chief Executives Service
CATEGORY ANNUAL BUDGET
[4]
PROJECTED OUT-TURN
VARIANCE
PROJECTED OUT-
TURN % PERIOD
MOVEMENT ANALYSIS
Page 206 of 276

Page 207

APPENDIX 4 
Value %
Service Specific Earmarked Reserves:
Admin of Covid and Cost of Living related support scheme 11,919 0 11,919 11,919 11,919 100.0% 11,919
COL Grant 34,645 0 34,645 34,645 34,645 100.0% 34,645
Modern Apprentices 75,838 (18,959) 56,879 25,097 28,456 50.0% 28,423 28,456 Balance required to support future costs.
Insurance Premiums 812,876 0 812,876 812,876 812,876 100.0% 812,876
Digitisation 83,797 0 83,797 83,797 83,797 100.0% 83,797
B&D - Investment model replacement of funds 627,000 (168,382) 458,618 219,630 458,618 100.0% 458,618
NLC10 posts 21,849 0 21,849 0 0 0.0% 21,849 0 Budget no longer required as project is now
complete.
NLC12 post 312,055 (251,905) 60,150 50,970 59,292 98.6% 858 59,292 Balance of budget required to support residual costs
in 2025/26.
B&D - Backfill for EUC Infrastructure Team (Windows 11) 137,900 0 137,900 95,766 102,466 74.3% 35,434 102,466 Balance of budget required to support residual costs
in 2025/26.
Learning Academy 100,000 0 100,000 83,702 100,000 100.0% 100,000
Construction Academy 228,000 0 228,000 0 43,694 19.2% 184,306 43,694 Balance required in 2025/26 to support ongoing
commitments.
CSH Recover NL 81,000 0 81,000 44,835 71,855 88.7% 9,145 71,855 Balance required in 2025/26 to support ongoing
commitments.
Recover NL CSH 2022/23 (Single Number) 457,861 (93,699) 364,162 0 0 0.0% 364,162 0 Balance required in 2025/26 to support ongoing
commitments.
Recover NL Grants 23,863 0 23,863 3,953 13,863 58.1% 10,000 13,863 Balance required in 2025/26 to support ongoing
commitments.
Cost of Living (Comms) 35,372 0 35,372 25,725 25,725 72.7% 9,647 25,725 Balance required in 2025/26 to support ongoing
commitments.
Cumbernauld Community Grants (Antonine Centre) 225,000 0 225,000 155,643 225,000 100.0% 225,000
Grant award Programme 148,000 (54,000) 94,000 94,000 75,000 79.8% 19,000 75,000 Balance required in 2025/26 to support ongoing
commitments.
Audit Fee 150,000 0 150,000 0 150,000 100.0% 150,000
TOTAL 3,566,975 (586,944) 2,980,030 1,742,558 2,297,207 77.1% 660,975 21,849 2,297,207
Reprofile to
Future Years
No Longer
Required
Reserves
Required In
Year
Commentary Regards Usage
Period 12 (01 April 2024 - 28 February 2025)
A - Chief Executives Service
FINANCIAL YEAR - 2023/24
DESCRIPTION OF EARMARKED RESOURCE Reserve
Allocation
Profiled in
Future Years
Approved
Reserve
Total
Spend to
Date
Projected Spend
Page 207 of 276

Page 208

APPENDIX 5
£000 £000 £000
01CEX Directorate & Support - Reivew of Support
Services 56 56 0
03CEX Directorate & Support 4 4 0
04CEX Finance (5%) 48 48 0
07CEX Legal & Democratic - Central Services (10%) 14 14 0
13CEXD Business & Digital - Reivew of Support Services 43 43 0
10CEX Business & Digital - Digital / Field Services -
Technical Support to Education & Families 92 92 0
11CEXD Business & Digital - DigitalNL (MS Licences) 200 200 0
12CEX Business & Digital - Technoclogy Solutions -
restructure and review of contracts 110 110 0
13CEX Business & Digital - Business Strategy 154 154 0
19CEX Strategic Communications & Engagement -
Corporate Communications 149 149 0
20CEX Strategic Communications & Engagement -
Communities 157 157 0
Historic Recurring Underspends 680 680 0
TOTAL 1,707 1,707 0
APPROVED SAVINGS
Ref. DESCRIPTION OF APPROVED SAVING Target Value Value
Deliverable Savings Gap Reasons for Savings Gap
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Savings
Period 12 (01 April 2024 - 28 February 2025)
A - Chief Executives Service
Page 208 of 276

Page 209

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/VR/RM Date 21/05/25 
Capital Programme 2024/25 Monitoring Report 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 07583 010 692 
Executive Summary
The purpose of the report is to provide an update on the 2024/25 resources and
expenditure for the Council's Strategic Capital Investment Programme. The report shows
the 2024/25 projected outturn position and the resultant variances. 
It is currently anticipated that the General Fund programme will have a projected
programme expenditure variance of £16.677m, primarily due to the ongoing reassessment
of vehicle replacement programme requirements, timing delays within the Town and
Community Hub programme and the new Roads and Infrastructure contract and public
utilities works for City Deal projects within Enterprise and Communities. 
The HRA programme is currently anticipating that expenditure will be £8.114m lower
mainly due to the reduced land costs as higher level of abnormalities costs being identified
within the New Build programme, together with a reduction in the number of projected
acquisitions through the Mortgage to Rent and Buy Back schemes within the Buy Back
programme.  In addition, the Mainstream programme is now projected to underspend by
£4.000m due to the outcome of an adjudication which reduced a contractors claim and
delayed works. 
Recommendations
It is recommended that Finance and Resources Committee: 
(1) Acknowledges the provisional outturn financial position of the Council’s Strategic
Capital Investment Programme as at 28 February 2025. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 11
Page 209 of 276

Page 210

1. Background 
1.1 The Strategic Capital Investment Programme 2024/25 to 2028/29 was approved at
Policy and Strategy Committee in March 2024 and represents the total Community
Investment Programme incorporating the General Services Capital Programme and
HRA Capital Programmes.  The programme was developed in conjunction with
Services and led by the Strategic Capital Delivery Group (SCDG) using the principles
established by the Council’s Capital Strategy. 
1.2 The General Services Capital Programme supported by General Services resources
demonstrates to communities that the place making visions for towns remains a priority
and that the approved 5-year capital investment plan supports delivery of The Plan for
North Lanarkshire. The programme includes additional investment in Town and
Community Hubs, the City Deal programme, and external grant funding. 
1.3 In addition, the Housing Revenue Account (HRA) resources support several HRA
Capital Investment Programmes including the Mainstream programme for investment
in the Council’s existing estate and delivery of the ambition for 5,000 additional supply
through the New Build and Council Buy Back programmes. 
1.4 The 2024/2025 General Services Capital Programme is currently £139.464m with a
£111.291m investment programme in relation to the Housing Revenue Account. This
reflects the approved budget in March 2024 at Policy and Strategy Committee and
subsequent decisions made at the Strategic Capital Delivery Group (SCDG) in
accordance with the SCDG terms of reference, and where appropriate either by the
individual service committees, Finance and Resources Committee or the Policy and
Strategy Committee per the Scheme of Administration. Appendix 1 provides a
breakdown of the overall 2024/25 budget by Service Programme and associated
approved budget movements. 
2. Report 
Overall Council Strategic Capital Investment Programme 
2.1 The overall Council Strategic Capital Investment programme for 2024/25 and the
provisional outturn to 31 March 2025 is summarised in Table 1 as follows: 
Page 210 of 276

Page 211

2.2 On a budgeted programme of £250.755m expenditure is anticipated to be £24.791m 
lower than current programme at this stage of the financial year. Further financial 
performance information regarding each of the programmes is discussed in section 2.3 
and 2.29 below. 
General Services Capital Programme and Projected Outturn by Service/ Programme 
2.3 The forecast financial performance of the overall General Services Investment
programme at 31 March 2025 is detailed in Appendix 2 and summarised below.  
Community Capital Investment  Programme Summary 2024/25
Current
Programme
£000s
Projected
Outturn 
£000s
Outturn
Variance 
£000s
Enterprise & Communities 129,060 113,642 15,418
Chief Executives 8,233 7,145 1,088
Adult Health & Social Care 2,171 2,000 171
General Services: Total Capital Investment 139,464 122,787 16,677
General Services Resources:
General Fund
External Grants & Contributions 2024/25 - GCG 45,183 45,183 0
External Grants & Contributions 2024/25 - Other Grants 9,365 9,365 0
External Grants & Contributions b/f 2023/24 - Other Grants 7,203 7,203 0
External Grants & Contributions Unapplied (2,974) (2,974) 0
Net External Grants & Contributions 58,777 58,777 0
Advanced Developers Contributions 1,507 1,507 0
City Deal Grant 1,264 1,264 0
Capital Receipts 3,250 6,291 3,041
Capital Receipts -Transfer to Capital Fund 0 0 0
CFCR 4,728 4,728 0
General Services: Total Resources 69,526 72,567 3,041
General Services : Borrowing Requirement 69,938 50,220 (19,718)
HRA : Total Capital Investment 111,291 103,177 8,114
HRA Resources:
Net External Grants & Contributions 15,452 17,236 1,784
Capital Receipts 0 15 15
CFCR 20,089 20,089 0
HRA : Total Resources 35,541 37,340 1,799
HRA : Borrowing Requirement 75,750 65,837 (9,913)
Summary
Total Council : Capital Investment 250,755 225,964 24,791
Total Council : Resources 105,067 109,907 4,840
Total Council : Borrowing Requirement 145,688 116,057 (29,631)
Page 211 of 276

Page 212

General Services Total Resources 
2.4 The revised programme approved by the SCDG is £139.464m with total resources
available to meet the current programme forecast to be £69.526m, resulting in a
borrowing requirement of £69.938m. 
2.5 In 2024/25 net external grants and contributions of £58.777m will be utilised. This
capital resource primarily includes the Scottish Government (SG) General Capital
Grant (GCG) receivable of £45.183m including allocations for Traffic Signals and Road
Safety Fund (TSRS, £2.434m) and LG Pay Award (£20.000m) and other specific SG
Grants including Vacant and Derelict Land Fund (VDLF, £1.231m), Live Labs II (LLII
£1.369m and Shared Prosperity Fund (SPF £1.406m). It also includes contributions
from other sources such as developer contributions of £4.483m. In addition, capital
grants received in 2023/24 have been added to the programme to match expenditure
in 2024/25 including £1.418m for VDLF, £1.841m for PBIP, £1.875m for Regeneration
Capital Grant Fund, £1.477m for Live Labs II and £0.231m for Community Bus Fund.
This has been offset by £2.974m of external grant and contributions for Live Labs II
(LLII £1.864m), VDLF (£0.318m), PBIP (£0.766m) and the Scottish Wildlife Trust
(£0.026m) which will not be applied in 2024/25, for projects which will now not be
completed until 2025/26. 
2.6 Receipts from the sale of assets are currently projected to be £6.291m, which is
£3.041m greater than the budget of £3.250m. These receipts will continue to be closely
monitored throughout the remainder of the financial year. 
2.7 Whilst the approved 5-year capital programme had assumed phasing of known
utilisation of developer contributions, the accelerated timing of drawdown of these
contributions of an additional £1.507m during 2024/25 to match in-year expenditure
reduces the borrowing requirement for 2024/25 and will instead be required in the
2025/26 financial year. 
2.8 In addition, the approved 5-year capital programme had assumed phasing of City Deal
grant income with no receipt in 2024/25 forecast, accelerated timing of receipt of this
grant of £1.264m during 2024/25 results in a corresponding reduction in the borrowing
requirement for 2024/25 and will instead be required in the 2028/29 financial year. 
General Services Total Expenditure 
2.9 As indicated in Table 1 the General Services investment programme is £139.464m. At
Period 12, the provisional outturn spend is £16.677m lower than current programme.
Further analysis by service/programme is outlined below and summarised within
Appendix 2. 
2.10 Enterprise and Communities is projecting outturn expenditure of £113.642m, which
is a £15.418m variance from current programme.  
2.11 Within Community Operations, the ongoing assessment of the Council’s vehicle 
requirements has resulted in a positive in-year variance in the vehicle replacement 
programme of £4.662m within the Operational and Infrastructure theme. The service is 
now considering other purchases that can be ordered and delivered early next financial 
year in order to reduce the reliance on external hires. In addition, the service are also 
experiencing delays in orders for HWRC equipment and replacement litter bins which 
has resulted in an in-year variance of £0.569m. 
Page 212 of 276

Page 213

2.12 Within Roads and Street Lighting theme, the timing of the commencement of the new 
Roads and Infrastructure contract has resulted in a positive variance of £1.551m for 
the LED Infrastructure & Street Lighting project.  Delivery of works will be completed in 
the new financial year. Within the Infrastructure renewal programme there is a £0.429m 
variance for Vehicle Restraint Systems due to the installation of the barrier requiring an 
element of design work with contractor capacity issues delaying the completion of the 
project into 2025/26 financial year. There is also an underspend of £0.209m for car 
parks, due to other competing priorities there has been a delay in identifying and 
designs works relating to the carpark works, it is anticipated that this will be delivered 
next financial year. 
2.13 Within Greenspace and Cemeteries theme, programme delivery schedules have now 
been received from the appointed contractor at Pather Farm Cemetery which has 
highlighted works will continue into 2025/26 with a variance of £0.679m.  In addition, 
Tree Asset management is reporting an in-year variance of £0.105m. This spend is in 
part related to the Team moving to a new location and because that project is delayed 
this has impacted on our ability to spend on an agricultural shed, and Ash Dieback 
Roads contracts have been delayed with the introduction of the new Enterprise contract 
mechanism and securing a contract has been difficult. EMR will be carried to allow 
further Ash Dieback works for roadside trees in 2025/26. 
2.14 Within the Parks Masterplan theme, an in-year variance of £0.286m in relation to
Bothwellhaugh Cottage works has arisen due to design stage delays and works will
now span into 2025/26. 
2.15 Within Town and Community Hubs, there is an in-year variance of £5.308m which is 
mainly in relation to the St Kevin’s Community Hub project which is now expected to 
result in a variance of £4.418m due to the requirement for additional pollution control 
testing and mitigation. These issues have now been resolved, and works are now 
underway. In addition, there is a variance of £1.011m in relation to the Grass Pitch at 
Gartcosh delays in Scottish Power completing work to move an electricity sub-station 
to enable the pitch works to take place. In addition, there are variances of £0.496m due 
to delays in contractor initial valuations at St Stephens Community Hub, £0.467m due 
to delays in the project start date at Glenboig Community Hub and £0.108m due to a 
delay in financial close at Chryston High School Extension. These underspends have 
been partially offset by increased in-year spend on Gartcosh Primary School of 
£1.649m where updated cashflows have now been received from the contractor on the 
spend that is achievable this financial year. 
2.16 These are partially offset by cost increases within Assets & Procurement, where works 
have been accelerated within the Office Accommodation theme of £1.918m to support 
the needs of services. 
2.17 Within Maintaining Existing Assets a programme variance of £0.958m is projected, 
primarily due to an emerging issue within the Time Capsule for the water sports facility 
and lifts within the venue which have resulted in a variance of £0.574m. The Service is 
working with the contractor to mobilise these works. This acceleration was approved at 
the SCDG in October 2024.  Within the theme, there have also been cost increases 
experienced on a major rewire project at Glencryan School mainly linked to additional 
asbestos removal works resulting in a variance of £0.963m. However, these have been 
offset by positive variances on roofing works of £0.293m and the re-profiling of other 
works into next financial year of £0.286m. 
2.18 Additional unforeseen drainage works for two modular accommodation projects within 
Sustainable Estate theme and completion of the Heathery Park nursery project within
Page 213 of 276

Page 214

the 1140 Early Learning and Childcare Expansion theme have resulted in cost 
increases of £0.300m and £0.124m respectively.  A variance of £0.425m within 
Outdoor Education is now reported where works on three pitch replacements are now 
anticipated to be completed in April 2025. These increased budget requirements will 
be managed by the Service within their overall 5-year budget allocations.   
2.19 These cost increases will be partially offset by a positive variance of £1.497m within 
the ASN theme linked to the Carnbroe and the Edward Lawson Centre projects which 
are now planned to complete in 2025/26.   
2.20 Within Place, it is anticipated that City Deal is now expecting a positive variance of 
£3.149m as a result of delays relating to external factors such as the need for additional 
ecological works, reduced public utility diversion costs and design costs being less than 
estimated and more challenging market conditions around key procurements. In 
addition, a delay in the award of the Roads and Infrastructure contract has meant that 
some works will not be complete until early 2025/26 resulting in a variance of £0.509m. 
This is partially offset by the acceleration of £1.125m for the Newhouse project within 
Economic Regeneration to facilitate external works. 
2.21 Committed expenditure of £112.455m is currently reported, which represents 98.96% 
of the targeted expenditure, and actual expenditure is £84.290m which represents 
74.17% of targeted expenditure. 
2.22 Chief Executives is projecting outturn expenditure is projecting outturn expenditure of
£7.145m, which is a £1.088m variance from current programme. 
2.23 This is primarily attributable to supply chain issues within the Strategic Communications 
and Engagement theme associated with the availability of suppliers to deliver play 
projects within the current financial year and prioritisation of UK Shared Prosperity Fund 
funding to support groups applying for a Community Asset Transfer. resulting in a 
programme variance of £0.539m. 
2.24 Within the Business and Digital theme, programme variances have arisen due to lower 
than anticipated project costs. Variances are projected of £0.378m due to delays in the 
contract award for Paperless Office within Digitisation & Innovation, £0.150m due to 
timing of works and release of contingency budgets associated with the Mosaic project 
within Line of Business and £0.020m due to staff recruitment within Capacity 
respectively. 
2.25 Committed expenditure of £6.761m is currently reported, which represents 94.63% of 
the targeted expenditure. Actual expenditure is £4.565m, which is 63.89% of targeted 
expenditure. 
2.26 Adult Health & Social Care is projecting outturn expenditure of £2.000m, which is a
£0.171m variance from the current programme. 
2.27 The variance is due to uncertainties in both demand and complexity of need, following 
on from the pandemic. 
2.28 Committed expenditure of £1.782m is currently reported, which represents 89.10% of 
the targeted expenditure, and actual expenditure is £1.577m which is 78.85% of 
targeted expenditure.  
HRA Capital Investment 
Page 214 of 276

Page 215

2.29 The financial performance of the HRA Capital Programme is reported in detail to the
Housing Committee.  A summary of performance as at 28 February 2025 is provided
at Appendix 3. Total expenditure of £103.177m is forecast for 2024/25 which is a
reduction in programmed expenditure of £8.114m. 
2.30 Within the Mainstream programme, a variance of £4.000m is projected as result of a 
successful outcome to the adjudication relating to the 4 Towers project in Coatbridge 
of £1.600m, and delayed work within the kitchen and bathroom replacement and fire 
door programmes partially offset by acceleration of programmed additional works 
following appointment of a new demolition contractors with net variance reported of 
£2.400m.  
2.31 A request will be made to the next meeting of the SCDG to re-profile £2.400m of 
expenditure into 2025/26.   
2.32 Projected costs within the New Build programme are expected to be £2.636m lower 
due to reduced land costs as a result of a higher level of abnormal costs being identified 
and some minor delays reprofiling expenditure to the next financial year. In addition, a 
reduction in combined programmed expenditure of £1.478m is projected due to a 
reduction in acquisitions through the Mortgage to Rent programme and the Buy Back 
scheme.   
2.33 Committed expenditure of £103.177m is currently reported, which represents 100.00%
of the targeted expenditure, and actual expenditure is £79.837m which is 77.38% of
targeted expenditure. 
Service Re-profiling Requests 
2.34 As mentioned in paragraph 2.29 , to ensure available resources more closely reflect
operational activity across themes, requests within the HRA programme to reprofile
budget to future years of the programme will be required and these will be presented
for approval at future meetings of the SCDG and will be incorporated in future reports. 
3. Measures of success 
3.1  N/A   
4. Supporting documentation 
4.1 Appendix 1: Strategic Capital Investment Programme 2024/25 budget movements
4.2 Appendix 2: General Services Capital Investment Programme Summary 2024/25
4.3 Appendix 3: HRA Capital Investment Programme Summary 2024/25 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 215 of 276

Page 216

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The financial impact is outlined within the report.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 216 of 276

Page 217

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Despite the updated programme approved at Policy and Strategy Committee in
March 2024 the capital programme continues to face challenges in relation to the
wider economic climate, linked to availability of materials, contractors and
inflationary pressures. These are currently being managed by services and Project
Boards associated with specific programme delivery and will continue to be
monitored throughout the year in accordance with the SCDG Terms of Reference
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 217 of 276

Page 218

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 218 of 276

Page 219

2024/25 Strategic Capital Investment Programme – budget movements                                                                                         Appendix 1 
Enterprise &
Communities
Chief
Executives
Adult Health
&Social Care Corporate
Total General
Services
Investment
Programme
Total HRA
Investment
Programme
Total
Community
Investment
Programme
£000s £000s £000s £000s £000s £000s £000s
24/25 Opening programme approved Policy& Strategy Committee 1 March '24 99,161 5,589 2,200 450 107,400 115,291 222,691
23/24 Overs/Unders Carry Forward 15,802 4,506 (29) (37) 20,242 0 20,242
24/25 Budget adjustments approved by SCDG 872 0 0 (872) 0 0 0
Increase/(Decrease) in Externally Funded Projects 17,161 1,919 0 0 19,080 0 19,080
Increase/(Decrease) in Council Funded Projects (1,264) 0 0 0 (1,264) 0 (1,264)
Increase/(Decrease) in CFCR 3,355 0 0 0 3,355 0 3,355
24/25 Re-profiling of projects to future years approved by SCDG (6,027) (3,781) 0 459 (9,349) (4,000) (13,349)
Revised Capital Programme 2024/25 129,060 8,233 2,171 0 139,464 111,291 250,755
Page 219 of 276

Page 220

General Services Capital Investment Programme Summary 2024/25 - as at 31 March 2025 Appendix 2
Investment Current
Programme
2024/25
£000s
Projected
Outturn
2024/25
£000s
Outturn
Variance
2024/25
£000s
Committed
Expenditure
@ P12          
£000s
Committed
Expenditure 
% of
Projected
Outturn
Actual
Expenditure 
@ P12      
£000s
Actual
Expenditure      
% of
Projected
Outturn
Enterprise & Communities 129,060 113,642 15,418 112,455 98.96% 84,290 74.17%
Chief Executives 8,233 7,145 1,088 6,761 94.63% 4,565 63.89%
Adult Health & Social Care 2,171 2,000 171 1,782 89.10% 1,577 78.85%
Total General Services Investment 139,464 122,787 16,677 120,998 98.54% 90,432 73.65%
General Services Resources;
External Grants & Contributions 2024/25 - GCG 45,183 45,183 0
External Grants & Contributions 2024/25 - Other Grants 9,365 9,365 0
External Grants & Contributions b/f 2023/24 - Other Grants 7,203 7,203 0
External Grants & Contributions Unapplied cfwd to 2025/26 (2,974) (2,974) 0
Net External Grants & Contributions 58,777 58,777 0
Advanced Developers Contributions 1,507 1,507 0
City Deal Grant 1,264 1,264 0
CFCR 4,728 4,728 0
Capital Receipts 3,250 6,291 3,041
Total Resources  69,526 72,567 3,041
Borrowing Requirement: 
General Services 69,938 50,220 (19,718)
Total General Services Borrowing Requirement 69,938 50,220 (19,718)
Total Resources incl Borrowing Requirement 139,464 122,787 (16,677)
Page 220 of 276

Page 221

HRA Capital Investment Programme Summary 2024/25 - as at 31 March 2025 Appendix 3
Investment Current
Programme
2024/25
£000s
Projected
Outturn
2024/25
£000s
Outturn
Variance
2024/25
£000s
Committed
Expenditure
@ P12       
£000s
Committed
Expenditure      
% of Projected
Outturn
Actual
Expenditure
@ P12     
£000s
Actual
Expenditure      
% of
Projected
Outturn
Mainstream Programme 63,114 59,114 4,000 59,114 100.00% 45,667 77.25%
New Build Programme 35,541 32,905 2,636 32,905 100.00% 25,770 78.32%
Council Buy Back Scheme 12,636 11,158 1,478 11,158 100.00% 8,400 75.28%
Total HRA Investment 111,291 103,177 8,114 103,177 100.00% 79,837 77.38%
HRA Capital Resources;
External Grants & Contributions 15,452 17,236 1,784
External Grants & Contributions Unapplied 0 0 0
Net External Grants & Contributions 15,452 17,236 1,784
CFCR 20,089 20,089 0
Capital Receipts 0 15 15
Total Resources 35,541 37,340 1,799
Borrowing Requirement:
HRA - Mainstream 47,695 43,680 (4,015)
HRA - New Build 19,925 15,530 (4,395)
HRA - Buyback Scheme 8,130 6,627 (1,503)
Total Borrowing Requirement 75,750 65,837 (9,913)
Total Resources incl Borrowing Requirement 111,291 103,177 (8,114)
Page 221 of 276

Page 222

Page 222 of 276

Page 223

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/PH/PF Date 21/05/25 
Chief Executive Service – Capital Monitoring Report 1 April to 28
February 2025 (Period 12) 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail TelferG@northlan.gov.uk Telephone 01698 302408 
Executive Summary 
This report highlights the financial performance and projected outturn of 2024/25 Chief
Executive capital programme for the period ended 28 February 2025 (Period 12). 
In summary the Service has a total capital budget of £8.233m, comprising of £5.203m
within Business and Digital and £3.030m within Strategic Communications and
Engagement.  This budget reflects the budget approved by the Policy and Strategy
Committee in March 2024; balances carried forward from previous years, UKSPF funding,
other external funding and subsequent decisions made at the Strategic Capital Delivery
Group (SCDG) in relation to reprofiling. 
The Service is currently projecting a year-end underspend of £1.087m at this stage of the
financial year.  Further explanation of management action taken by the Service is included
within the main report and attached appendices. 
Recommendations 
It is recommended that the Finance and Resources Committee: 
(1) Considers the financial position of the 2024/25 Chief Executive capital programme.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 12
Page 223 of 276

Page 224

1. Background 
1.1 This report provides a summary of the Chief Executive Service financial performance
for the period 1 April 2024 to 28 February 2025 (Period 12), with major outturn
variances highlighted and explained per the Council’s approved Financial Regulations. 
1.2 The Council approved its Capital programme at Policy and Strategy Committee on 14
March 2024 with an allocated budget of £6.620m for the current year.  In addition, carry
forwards from the previous year, Scottish Government funding for Play Areas, UKSPF
Grant funding, external funding and decisions made at SCDG in relation to reprofiling
have resulted in a revised Capital Programme of £8.233m for the 2024/25 Financial
Year as detailed in Appendix 1 of this report.
1.3 The Council’s approved Financial Regulations required the Chief Executive to remain
within his approved budgetary provision, and to report all significant deviations –
defined as the higher of £0.100m or 5% - within their budget monitoring reports.  Where
significant deviations are identified, Chief Officers must provide explanatory
commentary, outline the action required to rectify such deviations and where relevant,
must also highlight the impact this has on other budget headings. 
2. Report 
Summary of Financial Position 
2.1 The Service is projecting an underspend of £1.087m for the financial year 2024/25.
Capital budgets and expenditure are summarised in Appendix 1.   
Analysis of Significant Variances 
2.2 An explanation of variances within Business and Digital is detailed below: 
• Digitisation & Innovation
An underspend of £0.378m is projected due delays in the contract award for
Paperless Office and delivery of Community Alarms project. 
• Line of Business (LOB)
The service is projecting an underspend of £0.150m within the Booking System
project for ACC due to timing of works and release of contingency budgets within
the Mosaic project. 
• End User Devices (EUD) 
The service is currently projecting a break-even position. 
• Cyber 
The service is currently projecting a break-even position. 
• Capacity
The service is projecting an underspend of £0.020m due to further delays in the
recruitment of staff. 
• Innovation
Approval was further given from SCDG to reprofile budgets due to timing of
recruitment resulting in the service is now projecting a break-even position. 
Page 224 of 276

Page 225

2.3 A explanation of the current position within Strategic Communications and Engagement
is detailed below: 
The service is currently projecting an underspend of £0.539m due inability to deliver
planned projects prior to 31 March 2025, including play areas and prioritisation of
UKSPF funding to support groups applying for a Community Asset Transfer. 
Management Action 
2.4 The Service closely monitors all activities to ensure available budgets are maximised
whilst monitoring and actively managing the ongoing external challenges in delivery of
projects.  The Service continues to review the programme with updates being provided
to the SCDG and Committee. 
3. Measures of success 
3.1  The Service aim is to operate within approved budget resources over the term of the
capital programme. 
4. Supporting documentation  
4.1 Appendix 1 Summary Expenditure by Project / Theme 
Greg Telfer
Chief Officer (Finance and Technology) 
Page 225 of 276

Page 226

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
As stated within the main body of the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 226 of 276

Page 227

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.9.1 All activities undertaken by the Council are subject to risk, and in
acknowledging the Council’s approved Risk Management Strategy, Services
manage these as part of their overall corporate and service planning
processes.  The current economic climate, in particular, has the potential to
impact upon the Council’s ability to provide quality services within approved
budget levels. 
5.9.2 To minimise risk this report was prepared by Finance personnel in
consultation with budget managers, in accordance with the Financial
Regulations. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 227 of 276

Page 228

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 228 of 276

Page 229

Appendix 1
Theme 
Budget
£
Actual
£
Committed
£
Uncommitted
£
Projected
Outturn
£
Outturn
variance
£
Digitisation & Innovation 2,682,431          1,491,291        2,257,165        47,205                2,304,370           378,061            
Line of Business (LOB) System Portfolio 982,243             409,755           701,152           131,092              832,243              150,000            
End User Device (Eud) Refresh 1,361,528          305,493           1,255,003        106,525              1,361,528           -                    
Cyber 114,000             114,000           114,000           -                      114,000              -                    
Capacity 43,000               -                   22,547             -                      22,547                20,453              
Innovation 20,000               -                   -                   20,000                20,000                -                     
TOTAL BUSINESS and DIGITAL 5,203,202          2,320,539        4,349,867        304,821              4,654,689           548,513            
Community Board Project Investment Fund 2,474,520          1,789,381        1,956,314        79,282                2,035,595           438,925            
Community Asset Transfers 555,000             455,000           455,000           -                      455,000              100,000             
TOTAL STRATEGIC COMMUNICATIONS and ENGAGEMENT 3,029,520          2,244,381        2,411,314        79,282                2,490,595           538,925            
TOTAL CHIEF EXECUTIVES 8,232,722          4,564,920        6,761,181        384,103              7,145,284           1,087,438         
Chief Executives Capital Programme 2024/25
Summary Expenditure by Thematic Categories
1st April 2024 - 28th February 2025 (Period 12)
YTD OUTTURN
Page 229 of 276

Page 230

Page 230 of 276

Page 231

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    GT/KS/RM/GM Date 21/05/25 
Treasury Management Monitoring Report for quarter ended 31
March 2025 
From  Greg Telfer, Chief Officer (Finance and Technology)  
E-mail McnameeR@northlan.gov.uk Telephone Ryan McNamee, Finance
Manager 
Executive Summary
This report fulfils the key requirements of the Council’s reporting procedures for Treasury
Management in accordance with the CIPFA Code of Practice on Treasury Management
and the CIPFA Prudential Code for Capital Finance in Local Authorities. It informs on the
quarterly Treasury Management activity for the period 1 January 2025 to 31 March 2025
and compliance with the mandatory treasury and prudential indicators.
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the Treasury Management Activity for the quarter ended 31 March
2025 including the performance against the key treasury and prudential indicators.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 13
Page 231 of 276

Page 232

1. Background 
1.1 The Council manages its treasury activities in line with the CIPFA Code ‘Treasury
Management in the Public Services’. The Code requires the Council to produce reports
on its Treasury Management policies, practices and activities on a regular and ongoing
basis. The Council fulfils these obligations, in part, by the preparation of this Treasury
Management Monitoring report produced on a quarterly basis, encompassing a review
of performance. 
1.2 The Council’s “Treasury Management Strategy 2024/2025 and Treasury and
Prudential Indicators 2024/2025 to 2028/2029” was approved by Committee at its
meeting on 28 February 2024. The Treasury activity undertaken in the final quarter of
2024/25 reflects the key requirements of the Council’s 2024/25 Treasury Management
Strategy, with the Public Works Loan Board (PWLB) and Long-term Money Market
being the prime source of long-term funds. In terms of investment activity, this is
conducted in accordance with the approved 2024/25 investment strategy. 
2. Report 
Summary Position 
2.1. The net overall borrowing position to 31 March 2025 is £1,142.4m, which is an increase 
of £82.4m from the position at the 31 December 2024.  A detailed breakdown of the net 
cash movement is shown in column (6) within Appendix 1 and is discussed below. 
Borrowing  
2.2. At the end of the quarter, total external debt amounted to £1,188.1m, an increase of 
£57.8m. This was primarily due to additional net longer-term borrowing of £69.8m being 
undertaken, comprising new PWLB borrowing of £80.0m, offset by repayment of existing 
PWLB debt of £10.2m. 
2.3. During the quarter the Council sourced PWLB loans totalling £70.0m on an equal 
instalment payment (EIP) basis, which provides a smoother debt maturity profile, thus 
spreading the refinancing risk and £10.0m on an annuity basis for a 1-year loan replacing 
some temporary borrowing. Of this, £35.0m of the EIP loans were sourced at interest 
rates ranging from 4.94% to 4.97% over an 8-year repayment period, £20.0m sourced 
at an interest rate of 4.91% over a 9-year repayment period and £15.0m taking 
advantage of the PWLB HRA rate (see para 2.7) of 4.51% over a 6-year repayment 
period.  The £10.0m annuity borrowings were sourced at an interest rate of 5.07% over 
the 1-year period. In each case, the respective certainty rate or HRA rate discounts (see 
para 2.6 and para 2.7) were utilised.     
2.4. In addition, there was a decrease in net temporary borrowing of £10.0m, due to £45.5m 
falling due for repayment being offset by £35.5m of new borrowing.  There was also a 
£2.0m reduction in long term liabilities due to existing finance lease and Service 
Concessions obligations falling due for repayment.  
2.5. The Council’s approach to borrowing is in line with the approved strategy which aims to 
source long-term borrowing and take advantage of temporary (short-term) borrowing at 
attractive rates, and where possible, using internal cash balances, to meet the principal 
repayments, daily revenue account requirements and the capital financing requirement, 
in lieu of borrowing for capital purposes. The strategy adopted considers interest rate 
forecasts, the management of carrying costs and the retention of cash balances at 
appropriate levels, whilst managing the associated investment, interest, and liquidity risk.
Page 232 of 276

Page 233

2.6. The Council made a successful application to the PWLB to access the certainty rate 
which allows a 20-basis point (bps) (0.20%) discount on loans from the PWLB under the 
prudential borrowing regime. This will continue to provide the Council with an opportunity 
to borrow from the PWLB at more beneficial rates until 31 March 2025.  
2.7 A new PWLB HRA rate, which is 0.40% below the certainty rate, has been available from 
15th June 2023, which has been extended until March 2026 in the UK Budget in October 
2024, to support local authorities borrowing for Housing capital purposes or refinancing 
existing loans. In conjunction with our treasury advisors, we continue to review borrowing 
requirements and assess borrowing opportunities for the Council during 2024/25. 
2.8 The CIPFA Prudential Code stipulates that local authorities cannot borrow to invest 
primarily for financial return, deeming it imprudent to make investment or spending 
decisions which will increase the capital financing requirement resulting in new 
borrowing, unless it is directly and primarily related to the functions of the Council. The 
Council is compliant with this requirement.  Members should note also that PWLB loans 
are no longer available to local authorities planning to buy investment assets primarily 
for yield.   
2.9 Members will be aware interest rates have risen significantly over the past 2 years, 
increasing materially the cost of both short and long-term borrowing. In this quarter, the 
Bank of England reduced the base rate to 4.50% in February. It should be noted that the 
Council’s cost of short-term borrowing reduced slightly during the quarter. For the 
majority of the year the cost of short-term borrowing from other local authorities closely 
tracked base rate at around 5.00% - 5.25%. However, from late 2024 rates began to rise, 
peaking at around 6% in February and March 2025. The average rate on the Council’s 
short-term loans as at 31st March 2025 was 4.96%. 
2.10 After substantial rises in interest rates since 2021 many central banks have now begun 
to reduce their policy rates, albeit slowly. Gilt yields were volatile but have increased 
overall during the year. Much of the increase has been in response to market concerns 
that policies introduced by the UK government will be inflationary and lead to higher 
levels of government borrowing. The election of Donald Trump in the US in November is 
also expected to lead to inflationary trade policies. 
2.11 The PWLB certainty rate for 10-year maturity loans was 5.40% at the beginning of the 
period and 5.38% at the end. The lowest available 10-year maturity rate was 5.23% and 
the highest was 5.71%. Rates for 20-year maturity loans ranged from 5.68% to 6.14% 
during the period, and 50-year maturity loans ranged from 5.44% to 6.08%. 
Debt Restructuring  
2.12 In conjunction with our Treasury advisors, we monitored the economic climate in relation 
to our financial targets and Treasury Management Strategy, for the quarter under review. 
The interest rates prevailing throughout the period resulted in no beneficial opportunities 
for debt restructuring/rescheduling of the existing PWLB debt portfolio arising. 
2.13 The Council continues to hold £3.0m of LOBO (Lender’s Option Borrower’s Option) loans 
where the lender has the option to propose an increase in the interest rate at set dates, 
following which the Authority has the option to either accept the new rate or to repay the 
loan at no additional cost.  The rise in market interest rates increases the probability of 
LOBOs being called, however, no lender exercised their option during the quarter. 
2.14 Further reports regarding future activity will be presented to Committee as appropriate. 
Page 233 of 276

Page 234

Investments  
2.15 Treasury management investments arise from cash flows or treasury risk management 
activity, that results in balances being invested, until the cash is required for use in the 
course of business. 
2.16 At the end of the final quarter of 2024/25, the Council held total investments of £45.7m, 
which is a net decrease of £24.6m in cash and cash equivalents, primarily due to a 
£17.0m increase in short-term investments, reflecting maturing temporary investments 
of approximately £375.9m, and undertaking new short-term investments of £358.9m, and 
a movement in uncleared balances due to timing differences including cash in transit of 
£41.6m. See summary at Appendix 1, column 6. 
2.17 At quarter end the uncleared balances including cash in transit was £37.0m which is a 
net deficit position, a decrease of £41.6m compared to the position reported at the end 
of the previous quarter of a net surplus position of £4.6m.  This primarily reflects the 
timing of significant BACS receipts and payments as a result of the Easter holiday period 
being later than last year. The balance at 31 March 2025 comprises £37.0m of net BACS 
credits outstanding due for clearance within 3 days of the quarter end date, cash in transit 
balance of £0.2m, partly offset by cheques unpresented of £0.2m. 
2.18 In line with the approved strategy to manage liquidity, the Council aims to maintain a 
minimum balance of £30.0m available on an overnight basis (instant access), ensuring 
a prudent level of funds is maintained to meet all service requirements. 
2.19 During the quarter, the MPC voted to reduce the Bank of England base rate by 0.25% to 
4.50%, which resulted in short-dated cash rates also reducing, with rates ranging 
between 4.70% in early January to 4.37% in February, a reduction of 0.33% for 
overnight/7-day maturities. There is little noticeable difference between the 7 day and 1-
month SONIA (Sterling Overnight Rate) bid rates and generally available investment 
rates offered by financial institutions and money market funds. Despite this, the Council 
will endeavour to achieve good performance levels in investment activity.  
2.20 Overall the Treasury Management team continues to take a prudent approach to 
investing surplus funds in line with the approved 2024/25 Investment Strategy. Security 
of investment and ensuring sufficient liquidity are key investment criteria governing 
Council investment decisions. This approach is aligned to the prudent management of 
current commitments and future cash demands based on latest robust cashflow 
projections.  During the quarter, the rates on Debt Management Account Deposit Facility 
(DMADF) deposits ranged between 4.45% and 4.70% and money market rates between 
4.42% and 4.74%.  
2.21 However, as demonstrated by the liability benchmark reported at (xi) below and 
Appendix 3 attached, it is anticipated the Council will be a long-term borrower and 
therefore new treasury investments are primarily made to manage day-to-day cash flows 
using short-term low risk instruments. The existing portfolio of strategic pooled funds will 
be maintained to diversify risk into different sectors and boost investment income. 
Non-Treasury Management Investments 
2.22 During the quarter, no repayments were made in respect of third-party advances in 
connection with the Cumbernauld Academy DBFM and Greenfaulds DBFM. 
Page 234 of 276

Page 235

Interest Rate Movements & Other Economic Updates 
2.23 As outlined by our treasury management advisors, the Chancellor of the Exchequer 
delivered her Spring Statement in March 2025, following her Budget in October 2024. 
Based on the plans announced, the Office for Budget Responsibility downgraded its 
predictions for UK growth in 2025 to 1% from 2%. However, it upgraded its predictions 
for the four subsequent years. Inflation predictions for 2025 were pushed up, to 3.2% 
from 2.6%, before seen as falling back to target in 2027. The market reaction to the 
Spring Statement was more muted compared to the Budget, with very recent market 
turbulence being driven more by US trade policy decisions and President Trump. 
2.24 UK annual Consumer Price Index (CPI) inflation continued to stay above the 2% Bank 
of England (BoE) target in the later part of the period. The Office for National Statistics 
(ONS) reported headline consumer prices at 2.8% in February 2025, down from 3.0% 
in the previous month and below expectations. Core CPI also remained elevated, falling 
slightly in February to 3.5% from 3.7% in January, just below expectations for 3.6% but 
higher than the last three months of the calendar year. 
2.25 The UK economy Gross Domestic Product (GDP) grew by 0.1% between October and 
December 2024, unrevised from the initial estimate. This was an improvement on the 
zero growth in the previous quarter, but down from the 0.4% growth between April and 
June 2024. Of the monthly GDP figures, the economy was estimated to have 
contracted by 0.1% in January, worse than expectations for a 0.1% gain however in 
surprising news, February GDP grew 0.5%, exceeding expectations of 0.1% growth. 
2.26 The labour market continued to cool, but the ONS data still require treating with caution. 
Recent data showed the unemployment rate rose to 4.4% (3mth/year) in the three 
months to January 2025 while the economic inactivity rate fell again to 21.5%. The 
ONS reported pay growth over the same three-month period at 5.9% for regular 
earnings (excluding bonuses) and 5.8% for total earnings. 
2.27 The BoE’s Monetary Policy Committee (MPC) held base rate at 4.5% at its March 2025 
meeting, having reduced it in February. This follows earlier 0.25% cuts in November 
and August 2024 from the 5.25% peak. At the March MPC meeting, members voted 8-
1 to maintain base rate at 4.5%, with the one dissenter preferring another 25 basis 
points cut. The meeting minutes implied a slightly more hawkish tilt compared to 
February when two MPC members wanted a 50bps cut. In the minutes, the Bank also 
upgraded its Q1 2025 GDP forecast to around 0.25% from the previous estimate of 
0.1%. 
2.28 The February Monetary Policy Report (MPR) showed the BoE expected GDP growth 
in 2025 to be significantly weaker compared to the November MPR. GDP is forecast to 
rise by 0.1% in Q1 2025, less than the previous estimate of 0.4%. Four-quarter GDP 
growth is expected to pick up from the middle of 2025, to over 1.5% by the end of the 
forecast period. The outlook for CPI inflation showed it remaining above the MPC’s 2% 
target throughout 2025. It is expected to hit around 3.5% by June before peaking at 
3.7% in Q3 and then easing towards the end of the year, but staying above the 2% 
target. The unemployment rate was expected to rise steadily to around 4.75% by the 
end of the forecast horizon, above the assumed medium-term equilibrium 
unemployment rate of 4.5%. 
2.29 Our treasury management advisors maintain its central view that base rate would 
continue to fall throughout 2025. From the cuts in August and November 2024 and 
February 2025, which took bank rate to 4.50%, May is considered the likely month for
Page 235 of 276

Page 236

the next reduction, with other cuts following in line with MPR months to take base rate 
down to around 3.75% by the end of 2025. 
2.30 In global terms, the US Federal Reserve paused its cutting cycle in the first three 
months of 2025, having reduced the Fed Funds Rate by 0.25% to a range of 4.25%-
4.50% in December, the third cut in succession. Fed policymakers noted uncertainty 
around the economic outlook but were anticipating around 0.50% of further cuts in the 
policy rate in 2025. Economic growth continued to rise at a reasonable pace, expanding 
at an annualised rate of 2.4% in Q4 2024 while inflation remained elevated over the 
period. However, growth is now expected to weaken by more than previously expected 
in 2025, to 1.7% from 2.1%. The uncertainty that President Trump has brought both 
before and since his inauguration in January is expected to continue. The European 
Central Bank (ECB) continued its rate cutting cycle over the period, reducing its three 
key policy rates by another 0.25% in March, acknowledging that monetary policy is 
becoming meaningfully less restrictive. Euro zone inflation has decreased steadily in 
2025, falling to 2.2% in March, the lowest level since November 2024. Over the current 
calendar year, inflation is expected to average 2.3%. GDP growth stagnated in the last 
quarter of the 2024 calendar year, after expanding by 0.4% in the previous quarter. For 
2025, economic growth forecasts were revised downwards to 0.9%. 
2.31 Financial market sentiment was reasonably positive over most of the period, but 
economic, financial and geopolitical issues meant the trend of market volatility 
remained. In the latter part of the period, volatility increased, and bond yields started to 
fall following a January peak, as the economic uncertainty around likely US trade policy 
impacted financial markets. Yields in the UK and US started to diverge in the last month 
of the period, with the former rising around concerns over the fiscal implications on the 
UK government from weaker growth, business sentiment and higher rates, while the 
latter started falling on potential recession fears due to the unpredictable nature of 
policy announcements by the US President and their potential impact. 
2.32 The 10-year UK benchmark gilt yield started the period at 4.57% and ended at 4.69%, 
reaching a low of 4.44% in February and a high of 4.90% in January in between. While 
the 20-year gilt started at 5.08% and ended at 5.22%, hitting a low of 4.97% in February 
and a high of 5.40% in January. The Sterling Overnight Rate (SONIA) averaged 4.55% 
over the period.   
2.33 Due to the cut in the base rate during the period, short-term borrowing interest rates 
reduced with the short term 7-day offer rate ranging between 4.57% and 4.90% over the 
period. Taking account of the increase in borrowing rates and advice from our treasury 
management advisors, it was considered more cost effective in the near term to use a 
combination of internal resources or to borrow rolling temporary / short-term loans at 
lower interest rates where possible rather than long term borrowing. This will result in 
increased temporary borrowing costs for the Council partially offset by increased 
investment income earned on surplus balances. 
2.34 The Treasury Management team will continue to monitor financial and economic policy 
and their impact upon the Council’s investment and borrowing activity. 
2.35 The period in question ended shortly before US President Donald Trump announced his 
package of ‘reciprocal tariffs’, the immediate aftermath of which saw stock prices and 
government bond yields falling and introduced further uncertainty over the economic 
outlook and possible impacts will be reported in future reports. 
Page 236 of 276

Page 237

The Prudential Code for Capital Finance in Local Authorities 
2.36 The Local Government in Scotland Act 2003 requires the Council to undertake its 
Treasury activities in line with the Prudential Code for Capital Finance in Local 
Authorities.  
2.37 Committee, at its meeting on 28 February 2024, approved a report titled, “Treasury 
Management Strategy 2024/2025 and Treasury and Prudential Indicators 2024/2025 to 
2028/2029”. This report detailed a variety of mandatory and local indicators aimed at 
assisting members to determine that proposed capital investment levels and treasury 
management decisions satisfied the key requirements of affordability, prudence and 
sustainability. Performance against key prudential indicators for 2024/25 to date is 
detailed within Appendix 2. 
(i) Indicator 1(a) illustrates planned investment on capital expenditure is forecast to
be lower than initially anticipated by £76.3m in 2024/25. This reflects a reduction
of £33.7m in the General Fund capital investment and £52.6m for the HRA
Mainstream and New Build programmes partly offset by an increase in Credit
Arrangements of £10.0m reflecting updated estimates of IFRS16 on service
concession contracts.  For further information, this is monitored in detail as part of
the Council's capital programme reporting mechanisms which will provide spend
details including any revisions to the estimates approved in 2024/25. 
(ii) The mix of resources required to finance the capital expenditure in 2024/25 reflects
the updates on forecast capital investment. Therefore, the level of in-year
borrowing is anticipated to be lower by £100.7m due to a reduction in General Fund
programme requirements of £64.5m and £36.2m for HRA programme. This
forecast level of borrowing also reflects a net increase in capital grants and external
contributions of £6.7m with increased funds available to General Fund of £23.2m
primarily due to additional Scottish Government General Capital Grant of £20.0m
partly offset by a decrease in HRA programmes of £16.5m. An increase of £4.7m
in General Fund CFCR is also anticipated and an increase in capital receipts of
£3.0m. 
(iii) As a result of accounting issues arising from the pandemic recovery, the
implementation of IFRS 16 Lease Accounting was further delayed, but will be
implemented in 2024/25. Therefore, a restatement of existing liabilities for
operating leases to the credit arrangement category is estimated to have a £2.2m
impact. In addition, there is a subsequent impact of IFRS16 implementation on
Service Concessions liabilities in 2024/25.  The accounting impact is an estimated
increased capital investment of £96.5m (increase to capital financing requirement)
being recognised in 2024/25.  It should be noted that this is an accounting
adjustment and does not represent cash expenditure, which is offset by an equal
and opposite recognition of associated credit arrangements financing. 
(iv) Indicator 1(b) – The Council’s cumulative outstanding amount of debt finance is
measured by the capital financing requirement (CFR). The CFR is essentially a
measure of Council’s underlying borrowing need i.e. capital expenditure not
resourced by capital grants, receipts or CFCR, with any new borrowing increasing
the CFR. The CFR is projected to rise to £1,561.3m within financial year 2024/25. 
(v) The Prudential Code requires the Council’s capital investment to be prudent and
affordable. To demonstrate this, a Prudential Margin (the need to borrow versus
actual borrowing) is calculated. Indicator 1(c) demonstrates a healthy prudential
margin of £280.3m estimated as at 31 March 2025. The timing and profile of
Page 237 of 276

Page 238

external borrowing to replenish cash reserves and balances are being managed,
giving full consideration to liquidity, interest rate and refinancing risk, whilst
minimising the potential carrying costs. 
(vi) Indicator 1(d) illustrates that both the overall Authorised Limit and Operational
Boundary limits for borrowing and long-term liabilities have not been exceeded,
with the maximum borrowing undertaken within the period being well below the
approved boundaries. 
(vii) Indicator 1(e) illustrates the financing costs forecasts as at 31 March 2025 for both
general fund and HRA as a proportion of net revenue stream. Although capital
expenditure is not charged directly to revenue, interest payable on loans, and loan
fund and long-term liability repayments are.  The net annual charge is known as
financing costs; this is compared to the net revenue stream i.e. the amount funded
from Council Tax, NDR and government grants. 
(viii) Indicator 2(a) highlights the proportion of external interest payable by the Council
which is fixed and variable over the term of the borrowing, and therefore the
exposure to the effects of interest rate changes. As at 31 March 2025, the level of
borrowing subject to variability is deemed to be within acceptable levels. 
(ix) Indicator 2(b) highlights a projected increase in loan charges of £0.4m compared
to the initial Treasury Management Strategy estimates for 2024/25. This projection
takes into account treasury management activity, internal Interest on Revenue
Balances (IORB) recharges due to increased market interest rates, the loans fund
holiday flexibility adopted in 2022/23 and decisions of the Policy and Strategy
Committee and the Strategic Capital Delivery Group to approve and reprofile the
new capital programme for the period 2024/25 to 2028/29 based on current
programme delivery plans. This current loan charge variance is made up of: 
• A net treasury management interest and expenses increased spend of £0.7m
is projected (HRA £1.3m partly offset by decreased spend of £0.6m General
Fund), which is a primarily a reflection of increased internal IORB charges, and
incorporates cashflow management techniques adopted, e.g. directing the
timing of new borrowing, managing investment security, liquidity and interest
rate risk. 
• In 2024/25 it is anticipated there will be a minor reduction in anticipated loans
fund advance repayments of £0.3m (£0.2m General Fund, HRA £0.1m). This
is primarily due to revised average loan pool rates from previously forecast. 
(x) Indicator 2(c) relates to the level of fixed debt due to mature within time periods. 
The level of debt maturing remains within the upper limits set for each category at
the beginning of the financial year. 
(xi) The Liability Benchmark at Appendix 3.  The Treasury Management Code states
that organisations should evaluate the amount, timing and maturities needed for
new borrowing in relation to planned borrowing needs, in order to avoid borrowing
too much, too little, too long or too short. The liability benchmark is an important
tool to help establish whether the Council is likely to be a long-term borrower or
long-term investor in the future and so shapes its strategic focus and decision
making. Essentially this benchmark identifies the projection of external
debt/borrowing required over the long term to fund approved revenue & capital
budgets, while keeping treasury investments at the minimum level required to
manage day-to-day cash.
Page 238 of 276

Page 239

(xii) This represents the comparison of the Council’s actual borrowing against an
alternative strategy. This utilises the forecasts for Capital Financing Requirement,
long-term liabilities, current external borrowing, balance sheet resources i.e.
reserves, and that cash and investment balances are kept to a minimum of £30.0m
at each year-end to maintain sufficient liquidity but minimise credit risk. 
(xiii) The Loans CFR (solid light blue) represents the total cost of the capital expenditure
plans based on the estimated current profile of the 5-year Capital Programme
2024/2025 to 2028/2029 as approved by Policy & Strategy Committee on 14th
March 2024.  This reduces over time as scheduled principal repayments are made
to the loans fund. The Net Loans Requirement (dotted red line) represents the
minimum external borrowing required to fund the current capital expenditure plans
assuming all cash reserves and balances are utilised to offset borrowing
requirements.  The Liability Benchmark (solid red line) represents the estimated
borrowing required, taken account of liquidity allowance required of £30.0m to be
held to maintain liquidity and to manage day-to-day cashflows. 
(xiv) The solid grey section shows the maturity profile of current borrowing.  The gap
between the grey section and the liability benchmark line represents the estimated
additional borrowing that is forecast will be required to fund the current capital
expenditure plans, via long-term and short-term borrowing options. 
3. Measures of success 
3.1 Overall the approach adopted by the Council’s Treasury Management team during the
quarter under review met the key requirements of the 2024/25 Treasury Management
Strategy. Prudential indicators have remained in accordance with those approved by
Committee on 28 February 2024. The projected final outturn illustrates a healthy
prudential margin and borrowing levels that are below sustainable limits, ensuring that
the projected capital investment levels remain affordable and sustainable. However, the
current financial volatility and increased borrowing costs has resulted in an assessment
being undertaken of the potential impact on future years of the current capital
programme.  This will continue to be monitored to determine if any further review of the
programme is required to ensure that it remains sustainably affordable. 
4. Supporting documentation 
4.1 Appendix 1:  Loans, Long term Liabilities & Investments as at 31 March 2025 
4.2    Appendix 2:  Summary of Treasury and Prudential Indicators as at quarter ended 31   
March 2025 
4.3    Appendix 3: Liability Benchmark as at quarter ended 31 March 2025 
31/3/24
Actual
£m
31/3/25
Forecast
£m
31/3/26
Forecast
£m
31/3/27
Forecast
£m
31/3/28
Forecast
£m
31/3/29
Forecast
£m
Loans CFR 1,175.8 1,267.9 1,427.7 1,717.1 1,939.7 2,231.2
less Balance Sheet Resources (369.5) (372.6) (330.8) (313.9) (254.8) (242.5)
Net Loans Requirement 806.3 895.4 1,096.9 1,403.2 1,684.9 1,988.7
plus: Liquidity Allowance 30.0 30.0 30.0 30.0 30.0 30.0
Liability Benchmark 836.3 925.4 1,126.9 1,433.2 1,714.9 2,018.7
Existing Borrowing 866.9 987.6 689.6 629.4 575.9 526.7
New Borrowing Required 0.0 0.0 437.3 803.9 1,139.0 1,492.0
Page 239 of 276

Page 240

Greg Telfer
Chief Officer (Finance and Technology) 
Page 240 of 276

Page 241

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Financial impacts are outlined within the report.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 241 of 276

Page 242

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
As the Council borrows and invests significant sums of money it is exposed to
financial risks including the loss of invested funds and the revenue effect of
changing interest rates. Therefore, successful identification, monitoring and control
of risk remains central to the Council’s treasury management strategy. 
Treasury Management activity by its very nature has a number of inherent risks
including interest rate, liquidity and refinancing risks. To minimise risk for its
treasury management activities the Council adopts and operates in accordance
with the guidelines for best practice prescribed within the CIPFA “Treasury
Management in the Public Services” Code of Practice and the CIPFA Prudential
Code for Capital Finance in Local Authorities. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 242 of 276

Page 243

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 243 of 276

Page 244

LOANS, LONG TERM LIABILITIES & INVESTMENTS AS AT 31 MARCH 2025                                                                       Appendix 1
DEBT RESTRUCTURING   
BALANCE        
1-January-25
EARLY
REDEMPTION REFINANCING
NEW
BORROWING /
LONG-TERM
LIABILITIES
PRINCIPAL
REPAYMENTS
NET CASH
MOVEMENTS
BALANCE
31-March-25
(1) (2) (3) (4) (5) (6) (7)
LONG-TERM LOANS
PWLB 640,283,717 0 0 80,000,000 (10,160,387) 69,839,613 710,123,329
MONEY MARKET LOANS 54,000,000 0 0 0 0 0 54,000,000
LOBO 3,000,000 0 0 0 0 0 3,000,000
ENERGY EFFICIENCY LOAN 507,542 0 0 0 (26,023) (26,023) 481,519
697,791,259 0 0 80,000,000 (10,186,410) 69,813,590 767,604,849
SHORT-TERM LOANS
TEMPORARY 230,000,000 0 0 35,500,000 (45,500,000) (10,000,000) 220,000,000
MUNICIPAL BANK 0 0 0 0 0 0 0
INTERNAL LOANS 6,280 0 0 0 0 0 6,280
230,006,280 0 0 35,500,000 (45,500,000) (10,000,000) 220,006,280
LONG -TERM LIABILITIES
FINANCE LEASE OBLIGATIONS 1,055,925 0 0 0 0 0 1,055,925
LONG TERM LIABILITY 201,425,455 0 0 0 (1,992,769) (1,992,769) 199,432,685
202,481,379 0 0 0 (1,992,769) (1,992,769) 200,488,610
TOTAL EXTERNAL DEBT 1,130,278,918 0 0 115,500,000 (57,679,179) 57,820,821 1,188,099,739
INVESTMENTS
THIRD PARTY ADVANCES 1,135,267 0 0 0 0 0 1,135,267
BANKS & OTHER FINANCIAL INSTITUTIONS 64,528,531.88 0 0 0 0 16,973,166 81,501,698
UNCLEARED BALANCES INCL CASH IN TRANSIT 4,612,570 0 0 0 0 (41,594,361) (36,981,791)
CASH & CASH EQUIVALENTS 70,276,369 0 0 0 0 (24,621,194) 45,655,175
NET BORROWING 1,060,002,549 0 0 115,500,000 57,679,179 82,442,015 1,142,444,564
Page 244 of 276

Page 245

Appendix 2  
Summary of Treasury and Prudential Indicators as at quarter ended 31 March 2025
1. Prudential Indicators
(a) Capital Expenditure Initial
Estimate
2024/2025
(£m)
Projected 
Outturn 
2024/2025 
(£m)
Variance
2024/2025
(£m)
Forecast 
2025/2026 
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
Capital Expenditure: General Services 156.5 122.8 (33.7) 167.2 166.1 134.0 246.4
Capital Expenditure: HRA 155.8 103.2 (52.6) 132.4 220.3 189.5 157.6
Total spend : Capital Expenditure 312.3 226.0 (86.3) 299.6 386.4 323.5 404.0
Total spend : Credit Arrangement 88.7 98.7 10.0 14.4 15.5 16.1 15.0
Total Capital Investment 401.0 324.7 (76.3) 314.0 401.9 339.6 419.0
Financed By:     
Capital Grants & Other External Contributions 72.1 78.8 6.7 63.4 44.5 44.6 52.0
Capital from Current Revenue 20.1 24.8 4.7 46.8 20.1 20.1 20.1
Capital receipts 3.3 6.3 3.0 3.4 3.4 3.4 3.4
Capital receipts transfer to Capital Fund 0.0 0.0 0.0 0.0 0.0 0.0 0.0
CFR : Borrowing - General Services 114.8 50.3 (64.5) 94.1 135.2 103.0 208.0
CFR : Borrowing - HRA 102.0 65.8 (36.2) 92.0 183.2 152.4 120.5
Credit Arrangements 88.7 98.7 10.0 14.4 15.5 16.1 15.0
check 0.0 0.0 0.0 0.1 0.0 0.0 0.0
(b) Capital Financing Requirement (CFR) Initial
Estimate
2024/2025
(£m)
Projected 
Outturn 
2024/2025 
(£m)
Variance
2024/2025
(£m)
Forecast 
2025/2026 
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
General Services 1,081.8 1,000.0 (81.8) 1,082.7 1,204.0 1,291.4 1,479.6
HRA 603.8 561.3 (42.5) 638.9 806.3 940.9 1,041.1
Total CFR 1,685.6 1,561.3 (124.3) 1,721.6 2,010.3 2,232.3 2,520.7
Movement in CFR 276.6 152.3 160.3 288.7 222.0 288.4
(c) Gross Debt and the Capital Financing Requirement Initial
Estimate
2024/2025
(£m)
Projected 
Outturn 
2024/2025 
(£m)
Variance
2024/2025
(£m)
Forecast 
2025/2026 
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
Gross Borrowing : Loan Debt 1,147.1 987.6 (159.5) 1,186.6 1,492.4 1,773.4 2,083.2
Long-term Liabilites 293.0 293.4 0.4 294.0 293.2 292.7 289.6
Gross Debt 1,440.1 1,281.0 (159.1) 1,480.6 1,785.6 2,066.1 2,372.8
Capital Financing Requirement 1,685.6 1,561.3 (124.3) 1,721.6 2,010.3 2,232.3 2,520.7
Prudential Margin 245.5 280.3 34.8 241.0 224.7 166.2 147.9
Page 245 of 276

Page 246

Appendix 2 (cont) 
Summary of Treasury and Prudential Indicators as at quarter ended 31 March 2025
1. Prudential Indicators
(d) Authorised Limit and Operational Boundary Initial
Authorised
Limit
2024/2025
(£m)
Initial
Operational
Boundary
2024/2025
(£m)
Maximum
Borrowing
Level Q4
2024/2025
(£m)
Borrowing 1,515.0 1,465.0 975.5
Other Long-term Liabilities 340.0 340.0 200.5
Total Debt 1,855.0 1,805.0 1,176.0
(e) Proportion of Financing Costs to Net Revenue Stream
Initial
Estimate
2024/2025
(£m)
Projected 
Outturn 
2024/2025 
(£m)
Variance
2024/2025
(£m)
Forecast 
2025/2026 
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
General Fund Loan Charges 49.8 43.0 (6.8) 46.9 54.5 63.8 72.7
General Fund Finance Lease/PPP Costs 15.3 15.6 0.3 15.3 15.1 14.9 14.6
General Fund : Capital Financing Costs 65.1 58.6 (6.5) 62.2 69.6 78.7 87.3
General Fund : Net Revenue Stream 988.8 990.3 1.5 1,068.8 1,068.8 1,068.8 1,068.8
Proportion of Financing Costs to Net Revenue Stream - GF 6.6% 5.9% (0.7%) 5.8% 6.5% 7.4% 8.2%
Proportion of Financing Costs to Net Revenue Stream
Initial
Estimate
2024/2025
(£m)
Projected 
Outturn 
2024/2025 
(£m)
Variance
2024/2025
(£m)
Forecast 
2025/2026 
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
HRA Loan Charges 42.8 38.5 (4.3) 41.7 49.1 60.3 72.2
HRA Finance Lease/PPP Costs 0.3 0.3 0.0 0.3 0.3 0.3 0.3
HRA : Capital Financing Costs 43.1 38.8 (4.3) 42.0 49.4 60.6 72.5
HRA : Net Revenue Stream 167.1 160.5 (6.6) 171.9 175.3 188.6 201.6
Proportion of Financing Costs to Net Revenue Stream - HRA 25.8% 24.2% (1.6%) 24.4% 28.2% 32.1% 36.0%
Page 246 of 276

Page 247

Appendix 2 (cont) 
Summary of Treasury and Prudential Indicators as at quarter ended 31 March 2025
2. Treasury Management Indicators
a) Interest Rate Exposures on External Interest Payments Position as at
31/03/2025
(£m) %
External Interest Payable on Fixed Rate Loan Debt 38.3 99.2%
External Interest Payable on Variable Rate Loan Debt 0.3 0.8%
b) Loans Fund Revenue Account Initial
Estimate
2024/2025
(£m)
Projected 
Outturn 
2024/2025 
(£m)
Variance
2024/2025
(£m) %age
Loans Fund Interest Payments 58.2 59.5 (1.3) (2.2%)
Loans Fund Expenses 0.4 0.4 0.0 0.0%
Total Loans Interest Payments & Expenses 58.6 59.9 (1.3) (2.2%)
Loans Funds Investment Income (1.9) (2.5) 0.6 (31.6%)
Total Loans Fund Interest Payments Investment Income & Expenses 56.7 57.4 (0.7) (1.2%)
Allocated as follows :
Loans Fund Interest Payments Investment Income & Expenses:General Fund 32.4 31.8 0.6 1.9%
Loans Fund Interest Payments Investment Income & Expenses:HRA 24.3 25.6 (1.3) (5.3%)
Capital Advances Repayments -  General Fund 11.3 11.1 0.2 1.8%
Capital Advances Repayments -  HRA 13.0 12.9 0.1 0.8%
Total Capital Advances 24.3 24.0 0.3 1.2%
Total Loan Charges 81.0 81.4 (0.4) (0.5%)
c) Maturity Structure of Borrowing
<12months
12 months to
2 years 2 to 5 years 5 to 10 years
10 to 20
years
20 to 40
years >40 years
Upper Limit maturing :Fixed & Variable Rate Debt 15.0% 15.0% 25.0% 30.0% 35.0% 45.0% 30.0%
Lower Limit maturing :Fixed & Variable Rate Debt 0.0% 0.0% 5.0% 5.0% 5.0% 10.0% 10.0%
Maturity structure at the start of Q4 8.4% 7.3% 17.8% 27.6% 11.3% 23.8% 3.7%
Maturity structure at the end of  Q4 10.2% 7.8% 19.6% 27.7% 9.8% 21.6% 3.4%   
Page 247 of 276

Page 248

Appendix 3 
0
500
1,000
1,500
2,000
2,500
3,000
2024 2026 2028 2030 2032 2034 2036 2038 2040 2042 2044 2046 2048 2050 2052 2054
£m
Liability Benchmark - North Lanarkshire
Fixed rate loans LOBO loans Loans CFR Liability benchmark Net loans requirement
Page 248 of 276

Page 249

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    NLC-NTP-24-127 Date 21/05/25 
Contract Award for Progress Licence and Software Maintenance 
From  Greg Telfer, Chief Officer (Finance and Technology) 
E-mail TelferG@northlan.gov.uk Telephone 07583 010692 
Executive Summary
Finance and Resources Committee is asked to acknowledge the award of a contract for
Progress Licence and Software Maintenance (the ‘Contract’) to Progress Software Ltd. 
The Contract is for an initial period of 24 months anticipated to commence on 1 April
2025. 
The value of the Contract shall not exceed One hundred and Ninety-Eight thousand
Pounds Sterling (£198,000) exclusive of VAT. 
Recommendations 
It is recommended that Finance and Resources Committee: 
(1) Acknowledges the award of the Contract to Progress Software Ltd at the maximum
value of One hundred and Ninety-Eight thousand Pounds. 
The contract award for Progress License and Software Maintenance was made using the 
Negotiated Tendering Procedure (NTP) outlined with section 9 of the GCSO to Progress
Software, with advice sought from the Chief Officers of (Asset & Procurement and Legal
and Democratic), for the proposed use of the Negotiated Tendering Procedure to make
the contract award. 
The contract is for a period of Twenty-Four months, and the value of the Contract shall
not exceed One hundred and Ninety Eight thousand Pounds Sterling (£198,000)
exclusive of VAT.
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (18) Ensure our digital transformation is responsive to all people's
needs and enable access to the services they need
Programme of Work Digital North Lanarkshire
Item 14
Page 249 of 276

Page 250

1. Background 
1.1 The requirements within the Contract are currently under contract with Progress
Software Ltd. This contract is due to expire on 31st March 2025 with the Contract
detailed within this report due to supersede it. 
1.2 This contract is for the Annual licence Maintenance and support for NLC Progress         
applications deployed on Unix servers. There are currently 6 Progress applications
residing on the council’s Unix Solaris estate – all developed in-house over the last 20
years, namely: 
• Building Cleaning Management System (BCMS) - provides work order and recharge
facilities, for the maintenance of council facilities.
• Municipal Bank – manages the council’s bank (recently the bank service has
stopped but the management of the legacy account information remains for a 6-year
period).
• Home Insurance – manages council house insurance for tenants.
• Housing Services Management System (HSMS) – manages multiple Housing
Service-related functions including Tenancy Management, Rent Accounting,
Common Housing Register and Allocations, Homelessness, Arrears and Court
Processing, Housing Support, Repairs and Maintenance, Gas Servicing, Property
and Estate Management, Anti-Social Behaviour.
• Application Control System (ACS) – manages the batch processing for all Unix
hosted Progress and Oracle applications and databases.
• GIFT – file transfer management system for BACS, ledger, files etc. 
1.3 All these applications are subject to review of potential replacement systems and/or             
decommissioning over the next 3 years and the associated Unix platform on which they
are currently hosted. 
1.4 The licences cover the database and application server (concurrent user and CPU
based) connections to the databases and client networking access software
components for the various applications, and also for the application development tools
that are required to develop in-house application software by NLC staff rather than
external vendors of software applications. 
1.5 Progress Software is the sole supplier of their own technology platform software
components that organisations choose to develop IT applications internally and
licences are not available through resellers. 
1.6 Discussions were held to direct award this contract through the SVAR framework.
However, this has been unsuccessful as the supplier Progress Software are unwilling
to conform to the framework Terms and conditions. Further searches and confirmation
from the supplier have confirmed that NLC cannot access this supplier on any
framework, therefore the only option available for award is this NTP.   
2. Report 
2.1 A user intelligence group (the ‘UIG’) of technical and procurement representatives was
formed to review technical specifications, discuss trading processes, market conditions
and trends, ways to maximise community benefits and sustainability and to agree the
procurement strategy that would deliver maximum benefit for the Council via the
Contract. 
2.2 The initial estimated value of the Contract dictated that the procurement procedure be
undertaken in accordance with the Council's General Contract Standing Orders. 
Page 250 of 276

Page 251

2.3 The procurement procedure was undertaken as a “Negotiated Tender Procedure”
(NTP) in accordance with Regulation 9 of the Public Contracts (Scotland) Regulations
2015 Following advice from the Chief Officer (Asset and Procurement) and the Chief
Officer (Legal and Democratic), the Chief Officer (Business and Digital) approved the
progression of the NTP on 06 March 2025. 
2.4 The Contract award recommendation is made on the basis of the justification detailed
and appraised within the associated “NTP Strategy” document and following an
assessment of the offer received by Progress Software Ltd to ensure it was complete
and compliant with the Council’s requirements. 
2.5 Further details of the procurement procedure are provided in Appendix 1 and the SME
status and location of the tenderer is located within Appendix 2. 
2.6 The value of the Contract is One Hundred and Ninety-Eight Thousand pounds sterling
(£198,000) exclusive of VAT including any option to extend the Contract. 
2.7 The costs associated with contract delivery will be contained within Revenue budget
for within Business & Digital. 
Price Savings / Increases 
2.8 The pre-tender whole life estimate for the Contract was £198,000. 
2.9 The cost has remained the same as previous years, with no excessive increases. 
Price Stability 
2.10 The pricing is fixed for the duration of the contract. 
Community Benefits 
2.11 The procurement did not include a community benefit requirement. 
Fair Work First  
2.12 Within their tender submission, Progress Software Ltd. advised that they will commit to
the Scottish Governments “Fair Work First” initiative: 
Contract Management 
2.13 Officers from Business & Digital will be responsible for managing the Contract which
will be undertaken in accordance with the Council’s agreed approach to contract and
supplier management. 
3. Measures of success 
3.1 The Contract will deliver the following outcomes: 
• Continued maintenance and support of the council’s Progress application systems
hosted on Unix estate by Progress Software Ltd who licence the database and
application services. 
4. Supporting documentation 
4.1 Appendix 1 - Summary of Procurement Process
4.2 Appendix 2 - SME Status and Location of All Tenderers Page 251 of 276

Page 252

Greg Telfer
Chief Officer (Finance and Technology) 
Page 252 of 276

Page 253

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?     
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 253 of 276

Page 254

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Progress licenses are required to continue the support of Unix services which host 6
council systems applications, Building Cleaning Management System (BCMS),
Municipal Bank, Home Insurance, Housing Services Management System (HSMS),
Application Control System (ACS) & GIFT the file transfer system for BACS. These
applications are all subject to review of potential replacement systems and/or
decommissioned over the next 2 - 3 years. 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.  
Page 254 of 276

Page 255

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles
from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 255 of 276

Page 256

Appendix 1 – Summary of Procurement Process 
Response
CPT Contract Reference Allocated: NLC-NTP-24-127
Tender Platform Utilised: Other
Procurement Procedure Utilised: Negotiated Tender Procedure (NTP)
Governing Legislation / Regulations: Council's General Contract Standing Orders
Date Contract Strategy / NTP Approved: 07 March 2025
Date Tender Documents Released: 03 March 2025
SME % of Expressions of Interest: 0
NLC Based % of Expressions of Interest: 0
Tender Return Deadline: 07 Match 2025
Number of Tenders Received: 1
Tenders Received from SME’s: 0
Tenders Received from NLC Based Tenderers:  0
Number of Recommended Tenderers: 1
Assessment Team: John McBride, Mark Brennan
Anticipated Contract Start Date: 01 April 2025
Total Contract Period (Months): 24 months
Maximum Total Contract Value: £198,000 
Page 256 of 276

Page 257

Appendix 2 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
Progress Software  Large  USA 
Page 257 of 276

Page 258

Page 258 of 276

Page 259

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes ☒ No
Ref: NLC-NTP-23-135 Date: 21 May 2025 
Contract Extension for Provision of Merchant Acquiring Services 2024-
25 
From  Greg Telfer, Chief Officer (Finance and Technology) 
E-mail TelferG@northlan.gov.uk Telephone: Ryan McNamee,
Finance Manager 
Executive Summary 
The purpose of this report is for Committee to note the modification for the existing contract for
Provision of Merchant Acquiring Services 2024-25 (the ‘Agreement’) provided by Lloyds Bank
Cardnet, which is for the provision for processing debit and credit card transactions. 
The contract modification was made utilising the “Modification of contracts during their term”
procedure which is set out in the Regulations (Regulation 72) of the Public Contracts (Scotland)
Regulations 2015. 
The existing contract expired on 31 March 2025 and the Agreement was modified for a period of 3
months which commenced on 1 April 2025 and will end on 30 June 2025. This interim measure was
to ensure continuity of service for the Council’s ability to receive card payments across its services
via e-commerce, online or telephone transactions until such time as a new contract was awarded. 
A longer-term procurement exercise is underway, which will result in a direct award to the current
supplier via CCS Framework (RM6325 Payment Acceptance 2) with contract award to be approved
at Committee, with formal commencement of new contract anticipated from 1 July 2025 for a period
of 4 years. 
The value of the modification shall not exceed Fifty-Two Thousand and Two Hundred Pounds
Sterling (£52,200) exclusive of VAT 
Recommendations 
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the contract modification to the existing Provision of Merchant Acquiring
Services contract. 
Item 15
Page 259 of 276

Page 260

The Plan for North Lanarkshire 
Priority Improve North Lanarkshire's resource base 
Ambition Statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning 
Programme of Work Statutory / corporate / service requirement 
1. Background 
1.1 The contract is for the provision of merchant acquiring services to the Council, which
incorporates an electronic card merchant acquiring solution to process debit and credit card
transactions and manage the Council's relationship with card schemes e.g. VISA and issuers
such as Barclays bank.  These services enable the Council to accept / receive any card
payments across its services via e-commerce, online or telephone transactions. 
1.2 The current contract was noted at Finance & Resources Committee on 22 May 2024 to award
the contract to Lloyds Bank Cardnet utilising the Council’s Negotiated Tender procedure
(NTP).  The Agreement was for a period of 12 months, commencing on 1 April 2024 and
expiring on 31 March 2025.  The initial Agreement was for a contract value of Two Hundred
and Twenty Thousand Pounds Sterling (£220,000) exclusive of VAT 
1.3 The modification of this contract is through the Regulation 72 Contract Modification allowing
the existing contract to continue until 30 June 2025. This interim modification is in place
awaiting the new contract award process being completed with the new contract anticipated
to commence 1 July 2025 
2. Report 
2.1 The Council intended to commence a new contract award utilising Crown Commercial
Services (CCS) Framework - RM6325 Payment Acceptance 2 with new provision from 1 April
2025. 
2.2 However due to delays getting clarification from CCS with regards calling off from their
framework it has not been possible to have the new contract in place prior to the current
contract expiring.  A modification is required to the existing contract on current terms to
ensure there will be no impact to service provisions and continuity prior to the new contract
being put in place 
2.3 The modification period would be for 3 months to allow a direct award to be carried out from
the CCS Payment Acceptance 2 framework and ensure there is no break of service to the
council. 
2.4 Analysis of actual contract expenditure incurred estimates that modification of a three-month
extension to 30 June 2025 could result in estimated additional contract costs of Fifty-Two
Thousand and Two Hundred Pounds Sterling (£52,200) exclusive of VAT.  This would equate
to a contract variation of 23.7% of the original contract award.   
2.5 Total actual contract costs estimated is currently £260,900 which would be additional
expenditure of £40,900 (18.6%) on the initial contract award. 
2.6 In line with Financial Regulations clause 15.4 any significant variations should be reported to
Committee at the earliest opportunity. 
Page 260 of 276

Page 261

3. Measures of success 
The Agreement will deliver the following outcomes; 
3.1 The continuity of service provision for the Council’s receipt of card payments until the new
contract is formally awarded. 
3.2 Best Value has been considered to be demonstrated by current supplier who was the best
value option for the Council in the previous full market tender exercise.  Current supplier has
agreed to continue the existing contract on a 3-month extension on current contract terms. 
Interchange fees are set by the market e.g. Visa / Mastercard.  Service charges for
transactions will remain as per current contract. 
4. Supporting documents 
N/A 
Greg Telfer
Chief Officer (Finance and Technology)  
Page 261 of 276

Page 262

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Full impacts have been detailed in the report.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐ Page 262 of 276

Page 263

5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from the
United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out? 
Yes ☐ No ☐ 
Page 263 of 276

Page 264

Page 264 of 276

Page 265

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    VarRepApr25/JMcG/JMcK Date 21/05/25 
Contracts with Variations 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail mckinstryj@northlan.gov.uk  Telephone  07939 281 102 
Executive Summary
In accordance with the Council’s Financial Regulations, this report notifies the Committee
of contracts completed between 1st April 2024 and 31st March 2025, where the expenditure
levels have exceeded the contract award levels by greater than 5% or £25,000.
Recommendations
It is recommended that the Finance and Resources Committee: 
(1)  Acknowledge the content of this report and the accompanying appendix.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory/Corporate/Service Requirement
Item 16
Page 265 of 276

Page 266

1. Background 
1.1 The Councils General Contract Standing Orders (the ‘GCSOs’) outline financial
approval thresholds for contracts for goods, works and services. This report details
Works (construction contracts) where funding has previously been approved in line with
GCSO’s. 
1.2 The Councils Financial Regulation, (13.4) Significant Variations, details the threshold
of variances where reporting is required. 
1.3 The Chief Officer of Assets and Procurement is required to notify Committee on a
periodic basis of any such contracts containing variations as identified by the criteria in
1.1 above. 
2. Report 
2.1 The Councils Financial Regulations state, any variations where the outturn/expected
costs exceed the tendered contract price by the higher of £25,000 or 5%, or where the
outputs/outcomes achieved by the expenditure differ from those originally envisaged,
shall be reported by the Executive Director or appropriate Officer to the relevant
Spending Committee at the earliest opportunity. 
2.2 Contracts awarded by the Chief Officer of Assets and Procurement for works
undertaken in the period 1st April 2024 and 31st March 2025 containing variations are
detailed in Appendix.1 below. 
2.3 Due to the nature of construction contracts a flexible approach is required to manage
contract deliverables and desired outcomes and typically this is achieved by the
inclusion of a contingency allowance to address unknown quantities or abnormalities. 
2.4 Any construction works undertaken within the Council’s portfolio may encounter issues
that can result in additional costs after work has commenced. Asbestos is problematic
and costly to address, as is rot works, especially within the Council’s ageing property
estate. Working within “live” environments and restrictions of access is another
contributing factor to prolongation related claims, with other expenditure being
attributed to health and safety issues including addressing fire stopping issues.
Additional client instructions being added to contracts following award will also increase
the overall contract sum, but it should be noted that the scope of these instructions will
be within the parameters of the original tender documents and rates will be a direct
drawdown from those already provided or a benchmarking exercise is undertaken to
demonstrate value for money. 
3. Measures of success 
3.1  Contracts support the delivery of Council objectives and service priorities. 
3.2 Contracts containing variances are managed by the Council and are compliant with
Financial Regulations, GCSOs and procurement legislation. 
3.3 The Council’s Contract Register, and budgetary monitoring systems are kept updated
by services and management information is comprehensive and accurate. 
3.4 Best Value is both demonstrable and achieved.
Page 266 of 276

Page 267

4. Supporting documentation 
4.1 Appendix 1 – Summary of construction contracts containing variations. 
James McKinstry
Chief Officer (Assets and Procurement) 
Page 267 of 276

Page 268

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
As detailed in Appendix 1. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 268 of 276

Page 269

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
Contract management procedures may be susceptible to financial claims and legal
challenge if they are not discharged in accordance with Contract Conditions,
Financial Regulations, GCSO’s and procurement legislation. 
Accumulation of contract overspends may impact on future Capital Programmes.
Project risks are logged on the appropriate Risk Registers and managed by the
Service.
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 269 of 276

Page 270

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles
from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐     
Page 270 of 276

Page 271

APPENDIX 1 Summary of construction contracts containing variations:
Project Title Estimated /
Final Out-turn Tender Amount Variation Reason
Muirhead; St Barbara’s Primary
School – 4 x classroom
refurbishments
£268,400.62 £226,211.27
Client changes to M&E requirements,
refurbishment to additional rooms / areas and
additional upgrading of existing door entry
intercom system.
Cumbernauld: Woodlands Primary
School - Provision of a New Multi-
Use Games Area (MUGA)
£153,196.34 £136,999.12 Alterations to fence lines, paths and gates to
enable community access to the MUGA.
Motherwell; Dalziel High School
Lift Installation £251,180.22 £228,169.22
Out of hours working resulting in an extension of
time claim (EOT), required to facilitate school
timetable
Cleland; St Mary’s Primary School
- Front Entrance Upgrade £60,688.16 £57,367.40 Client additional request to refurbish the reception
area, instructed into the works.
Cumbernauld, Glencryan School –
Rewire, Fire Stopping and
Redecoration
£2,961,438.02 £1,298,988.23
Despite a full asbestos survey pre-tender, the true
extent of asbestos was not evident. A change to
school management plans meant only one
classroom at a time was available to the
contractor. H&S instructed all works could only
commence out of hours due to a demographic
change in school role, accumulating to further
prolongation related claims and EOT award.
Cleland; St Mary’s Primary School;
Re-Roofing £143,677.33 £128,834.75
Removal of asbestos containing material
encountered within the works and additional rot
repairs required to existing roof timbers
Cumbernauld; Internal
Refurbishment Works to Tryst
Sports Centre
£585,430.43 £508,531.88
Asbestos encapsulation works and a Fire Alarm
system upgrade was required resulting in EOT
claim.
Airdrie; Integrated Hub Delivery
Phase 1 – Caldervale HS Tech
Centre
£226,795.12 £123,721.37 RAAC related strip out works to ascertain extent of
structural issues. 
Viewpark; Demolition of Muirpark
Home £88,933.00 £67,926.00 
Removal of unexpected asbestos cement packers
below floor joists of asbestos. Subsequent areas
of rubble were deemed contaminated which
impacted on the removal strategy.
Motherwell; St Brendan’s PS - New
Kitchen Upgrade £342,498.86 £309,743.33
Greater than anticipated asbestos removal
required and additional steelwork required to
support air handling unit. 
Cumbernauld; Our Lady’s High
School - PE Changing Facilities £322,000.00 £254,637.72
Additional Mechanical & Electrical works required.
A change to fixed furniture specification.
Replacement glazing was required. Removal of fly
tipping and additional unforeseen asbestos
removal.
Page 271 of 276

Page 272

Project Title Estimated /
Final Out-turn Tender Amount Variation Reason
Coatbridge; Coltswood Cemetery
Alterations (Phase 1) £109,264.73 £81,530.73
Additional civils works required to remove tree
roots and historic soil bunding, client requested
additional lairs to be added.
Chryston HS Enabling Works  £470,836.07 £330,896.07
To maintain timely progress on site and mitigate
risk to the project completion date, additional site
strip and removal of a service chamber was
instructed in. 
Pitch Upgrades £3,491,271 £3,200,000
Unforeseen and challenging ground conditions,
additional drainage work and unplanned lime
stabilisation works required. 
Page 272 of 276

Page 273

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    JMcK/CPT Date 21/05/25 
Contracts awarded below Committee approval threshold 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail McKinstryJ@northlan.gov.uk  Telephone 07939 281 102 
Executive Summary
In accordance with the Council’s General Contract Standing Orders (“GCSOs”), GCSO
21.10 requires a summary report be presented to members with details of contracts
awarded since last committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the contract awards made since last committee reporting cycle.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 17
Page 273 of 276

Page 274

1. Background 
1.1 The Local Government (Scotland) Act 1973 section 81 requires local authorities to
“…make standing orders with respect to the making by them or on their behalf of
contracts for the supply of goods or materials or for the execution of works.”. 
1.2 The Council’s General Contract Standing Orders (“GCSOs”) set out the council’s
specific procurement procedures and responsibilities at all spend levels, and include
the reporting requirements of procurement activity, including contracts awards, to
committee for either approval or acknowledgement. 
2. Report 
2.1 In accordance with GCSO 21.10, this report summarises the contract awards since last
committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
2.2 If you require further information regards the contract awards reported, please refer to
the lead service area / Chief Officer detailed in the appendix. 
3. Measures of success 
3.1 All requirements contracted contribute to either the council’s programme of work and/or
fulfil a statutory requirement. 
3.2 All contract awards secure best value for the council in accordance with their evaluation
criteria. 
3.3 All necessary diligence has been undertaken in the evaluation and appointment of
contractors. 
3.4 All contract awards are logged in the council’s contract register. 
4. Supporting documentation 
4.1 Appendix 1 – Summary of contracts awarded. 
James McKinstry
Chief Officer (Assets and Procurement) 
5. Impacts 
5.1 Impacts considered as part of the contract award procedures are recorded in the
individual contract award reports held by the lead service area.  
Page 274 of 276

Page 275

Appendix 1 – Summary of Contracts Awarded 
Contract Ref NLC-SLP-24-068
Title Corporate Web Filtering Solution
Classification Supplies
Lead Service Area / Chief Officer Katrina Hassell, Chief Officer (Business & Digital Solutions)      
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Call-off following Direct Award using Third Party Framework
No. of Framework Contractors 27
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments This has been procured via Direct Award approach, considering the relevant information on
Framework Contractors technical and commercial proposals available through the NHS Digital 
Workplace Solutions Framework (SBS/19/AB/WAB/9411).     
Award
Details
Value £498,984.03
Contract Duration 36 months
Contractor Name Softcat PLC
Contractor Size Large Company
Contractor Location Buckinghamshire, UK
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? Yes      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☐
HR Policy Impact ☐ Data Protection Impact ☐ Environment / Carbon
Impact ☐
Risk Impact ☐ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☒
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 275 of 276

Page 276

Page 276 of 276