Page 1

17 February 2025 
Members of the 
Finance and Resources Committee
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Finance and Resources Committee is to be held in
the Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on
Wednesday, 26 February 2025 at 10:00 AM which you are requested to attend. 
The agenda of business is attached. 
Archie Aitken
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Karen Swan
Clerk Telephone: 07919 730272
Clerk Email: committee@northlan.gov.uk 
A Duffy-Lawson, H Dunbar, A Ballinger, M Boyd, G Brennan, A Bustard, T Carragher, S
Coyle, D Crichton, G Currie, K Duffy, H Gray, J Hume, D Johnston, T Johnston, P Kelly, J
Keltie, K Larson, G Lennon, J Logue, H Loughran, A Masterton, P McDade, R McKendrick,
J McLaren, M McPake, J McPhilemy, L Nolan, P Patton, C Quigley, L Roarty, G Robinson,
W Shields, A Smith, A Stubbs, L Stubbs, R Sullivan, S Watson, C Williams, G Woods.  
Page 1 of 376

Page 2

Page 2 of 376

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000   
2 Minute of Joint Consultative Committee for Local
Government Employees of 10 December 2024
Submit Minute of Meeting of the Joint Consultative
Committee for Local Government Employees of 10
December 2024. 
9 - 12  
Operational   
3 Annual Freedom of Information Report Financial
Year 2023-24
Submit report by the Chief Officer (Legal and
Democratic) providing details of Freedom of
Information and Environmental Information requests
received by the Council during 2023/24 
13 - 22 
4 Revenues and Benefits Update
Submit a report by Chief Officer (Finance) providing an
update on the performance within the Revenues and
Benefits functions of Finance as at 31 December 2024. 
23 - 42 
5 Review of Employee Code of Conduct
Submit report by the Chief Officer (People Resources)
seeking approval of the updated and revised Employee
Code of Conduct. 
43 - 66 
6 Update to Special Leave Policy - Bereavement
Leave
Submit report by the Chief Officer (People Resources)
outlining the current leave provisions available to
employees who are dealing with the bereavement of a
close relative and seeking approval of the proposed
enhancement to bereavement leave for employees. 
67 - 76
Page 3 of 376

Page 4

7  Connectivity Programme – Wide Area Network
Project Completion
Submit report by Chief Officer (Business and Digital)
providing details on the successful completion of the
Connectivity Programme Wide Area Network project. 
77 - 82 
8 Land Reallocation - Former Columba High,
Coatbridge
Submit report by the Chief Officer (Assets and
Procurement) seeking approval to the transfer of land
at the former Columba High for inclusion in the new
build programme. 
83 - 88 
9 Land Surplus to Operational Requirements at Ailsa
Road, Coatbridge
Submit report by the Chief Officer (Assets and
Procurement) seek approval to declare and at Ailsa
Road, Coatbridge surplus to Council requirements. 
89 - 96 
10  Property Surplus to Operational Requirements -
Rockburn Pavilion and Pitch, Carnoustie Place,
Bellshill
Submit report by the Chief Officer (Assets and
Procurement) seeking approval to declare a pavilion,
sports pitch and ancillary ground at Carnoustie Place,
Bellshill surplus to Council requirements. 
97 - 102 
11  Local Government in Scotland - Financial Bulletin
2023-24
Submit report by the Chief Officer (Finance) examining
a number of areas including Council Funding and
Budgets, Financial Performance, Financial Position
and outlook at end of 2023/24. 
103 - 144  
Performance   
12  Strategic Performance Framework - latest
performance results for Legal and Democratic
Submit report by the Chief Officer (Legal and
Democratic) providing an update on the suite of
performance indicators used by Legal and Democratic. 
145 - 154
Page 4 of 376

Page 5

13  Digital North Lanarkshire Programme of Work –
Performance Optimisation Innovation Fund
Submit report by the Chief Officer (Business and
Digital) providing an overview on Services ability to
access the Innovation Fund, and the progress of the
Performance Optimisation Sub Group. 
155 - 162 
14  Senior Information Risk Officer (SIRO) -
Information Governance -Assurance and
Performance Report 2024
Submit report by the Chief Officer (Business and
Digital) outlining information governance activity and
performance in respect of the period from 1 January to
31 December 2024. 
163 - 202  
Financial   
15  Revenue Monitoring Report Council Summary 1
April 2024 to 3 January 2025
Submit report by the Chief Officer (Finance) (1)
providing an update on the overall position for the
General Fund Account, Housing Revenue Account and
Adult Health and Social Care, for the financial year to
31 March 2025; (2) consolidating the budget monitoring
position of all Services, and (3) highlighting and
explaining major outturn variances as per the Council's
approved Financial Regulations. 
203 - 214 
16  Revenue Budget Monitoring Report; Chief
Executive's Service 1 April 2024 to 3 January 2025
(Period 10)
Submit report by the Chief Officer (Finance) (1)
providing a summary of the Chief Executive's financial
performance for the period from 1 April to 3 January
2025 (Period 10) and (2) illustrating the provisional
outturn as at 31 March 2025, with major outturn
variances highlighted and explained as per the
Council's approved Financial Regulations. 
215 - 226
Page 5 of 376

Page 6

17  Capital Programme 2024-25 Monitoring Report
Submit report by the Chief Officer (Finance) providing
an update on the 2024/25 resources and expenditure
for the Council's Strategic Capital Investment
Programme; and (2) detailing the 2024/25 projected
outturn position and the resultant variances. 
227 - 238 
18  Chief Executive Service - Capital Monitoring Report
1 April 2024 to 3 January 2025 (Period 10)
Submit report by the Chief Officer (Finance)
highlighting the financial performance and projected
outturn of 2024/25 Chief Executive capital programme
for the period ended 3 January 2025. 
239 - 246 
19  Treasury Management Monitoring Report for
Quarter Ended 31 December 2024
Submit report by the Chief Officer (Finance) informing
on the quarterly Treasury Management activity for the
period from 1 October 2024 to 31 December 2024 and
compliance with the mandatory treasury and prudential
indicators. 
247 - 264 
20  Treasury Management Strategy 2025-26 - Treasury
Management and Prudential Indicators 2025-2026
to 2029-2030
Submit report by the Chief Officer (Finance) seeking
approval the Treasury Management Strategy
2025/2026 and adopts the Treasury Management and
Prudential Indicators for 2025/2026 to 2029/2030. 
265 - 310 
21  Procurement Strategy 2025-26
Submit report by the Chief Officer (Assets and
Procurement) outlining the evolution of the
Procurement Strategy with the refinements to provide
the new "Procurement Strategy 2024/25" to cover the
period from 1 April 2025 to 31 March 2026. 
311 - 338 
22  Review of 2024-25 to 2026-27 Budget Savings
Submit report by the Chief Officer (Finance) providing
an update on the achievement of the three-year
financial savings total of £28.778m approved as part of
the 2024/25 budget setting process. 
339 - 344
Page 6 of 376

Page 7

23  Local Taxation Debt Write-Off 2024-25
Submit report by the Chief Officer (Finance) providing a
summary of outstanding local taxation accounts which
are deemed uncollectible following all attempts at
recovery. 
345 - 350  
Remit   
24  Remit - Housing Committee - Former Tenant
Arrears Write Off to 31 March 2023
Submit report by the Chief Officer (Housing) providing
a summary of outstanding Housing Rent debts which
are deemed uncollectable following all attempts at
recovery by the Housing Rents and Court teams or are
considered uneconomically viable to continue pursuing. 
351 - 356  
Contracts   
25  Contract award for enabling works at Strathclyde
Park Watersports Centre
Submit report by Chief Officer (Community Operations)
notifying the award of a contract to deliver the design
and construction work required for the net zero led
redevelopment of the Watersports Centre at
Strathclyde Country Park to Linear Design and
Construct. 
357 - 362 
26  Contract Award for Recover NL Programme Pitch
Upgrades
Submit report by Chief Officer (Assets and
Procurement) notifying the award of a contract to
upgrade pitches to W H Malcolm Limited. 
363 - 370 
27  Contract Awards Below Committee Approval
Threshold
Submit report by the Chief Officer (Assets and
Procurement) notifying of the Contracts Awarded since
the last meeting of the Committee with a value below
the financial threshold requiring approval. 
371 - 376
Page 7 of 376

Page 8

EXCLUSION OF PUBLIC
The Sub-Committee is asked to consider passing the
following resolution: "That under Section 50A(4) of the
Local Government (Scotland) Act 1973, the public be
excluded from the meeting for the following item of
business on the grounds that it involves the likely
disclosure of exempt information as defined in
paragraphs 6 and 9 of Part 1 of Schedule 7A of the
Act". 
28  Cumbernauld Town Centre – Freedom City Church
and JD Wetherspoon Property Transactions
Submit report by Chief Officer (Assets and
Procurement) seeking approval to purchase Freedom
City Church and the lease of JD Wetherspoons. 
Page 8 of 376

Page 9

JOINT  CONSULTATIVE  COMMITTEE  FOR  LOCAL  GOVERNMENT  EMPLOYEES  - 
10 DECEMBER 2024 
10 December 2024 at 2pm. 
A Meeting of the JOINT  CONSULTATIVE  COMMITTEE  FOR  LOCAL  GOVERNMENT 
EMPLOYEES 
PRESENT 
Councillor Boyd, Convener; Councillors Brannan-McVey, Cairns, Carragher, Currie, Hume, Jarvie and D.
Johnston 
A Clark, J Hannigan, M Quigley, J Rooney, V. Thompson, J Watson and D. Whelan. 
CHAIR 
Councillor Boyd (Convener) presided. 
IN  ATTENDANCE 
Chief Officer (People Resources), Employment and Policy Manager and Democratic Co-ordinator. 
APOLOGIES 
Councillors M. Coyle, Duffy and Logue and H. Smith, Unison, L Steward, Unison and F. Duddy (Occupational
Safety and Wellbeing Manager). 
DECLARATIONS OF INTEREST IN TERMS OF THE ETHICAL STANDARDS IN PUBLIC LIFE ETC.
(SCOTLAND) ACT 2000 
1. Councillor Cairns, by virtue of his employment, declared a connection amounting to a declarable interest in
respect of Paragraph 4 – Review of the Council’s Trade Union Consultative Arrangements for Local
Government Employees, and further declared that he considered the item was so sufficiently remote that it
did not preclude his participation in consideration of the item. 
CHANGES TO FLEXIBLE RETIREMENT COSTS 
2. There was submitted a report by Chief Officer (People Resources) (1) providing an update on the changes
advised by Strathclyde Pension Fund (SPF) and the impact on future applications for flexible retirement; (2)
intimating that the costs associated with flexible retirement had increased and the Council would not be able
to incur the residual strain on the fund cost; (3) advising that the Council would be unable to pay any costs
associated with flexible retirement; and (4) indicating that as a result of the changes fewer employees would
be able to take flexible retirement. 
J. Watson, Unison inquired whether Council employees who had applied for flexible retirement had been
updated on the information received from Strathclyde Pension Fund and whether SPF had been asked if
employees could make up the difference to enable to take flexible retirement. 
The Employment and Policy Manager advised that the Council’s Policy for flexible retirement, which had
been approved by Committee, had no enhanced funding from the Council budget to allow employee’s flexible
retirement and confirmed that the Council had raised the question in respect to an employee paying the
difference to allow them to take flexible retirement and were advised it would not be permissible.   
Item 2
Page 9 of 376

Page 10

JOINT  CONSULTATIVE  COMMITTEE  FOR  LOCAL  GOVERNMENT  EMPLOYEES  - 
10 DECEMBER 2024 
It was noted that ill health retirement had not been affected. 
The Chief Officer (People Resources) confirmed that the Council had, made a number of approaches to
(SPF), and the lack of feedback from SPF had impacted on communicating the changes to employees.   
It was requested that the Council representative raise the issue with the SPF Board.  The Chief Officer
(People Resources) advised that she would seek clarity on whether this was permissible. 
Decided: 
1) that the changes notified to all employers by Strathclyde Pension Fund Office around strain costs be
noted;
2) that the impact that these changes would have on future applications for flexible retirement be
recognised;
3) that it be noted that the Council would only approve applications for flexible retirement where there
was no cost to the Council; and 
4) that it be noted that the flexible retirement information and guidance available to employees and
managers had been updated to manage expectations.   
SPECIAL LEAVE PROVISION - BEREAVEMENT LEAVE 
3. There was submitted a report by Chief Officer (People Resources) (1) providing details of the current leave
provision available to employees who were dealing with bereavement; (2) detailing the impact and benefits
of changes to bereavement leave; (3) seeking approval to enhance bereavement leave for employees; and
(4) intimating that the changes to the Policy would be required to be approved at Finance and resources
Committee.   
Decided: 
(1) that the contents of the report be noted;
(2) that the impact and benefits of the changes to bereavement leave for employees of the Council be
acknowledged; 
(3) that the proposed enhancement to bereavement leave for employees be approved; and 
(4) that it be noted any changes to the policy would require to be approved at the Finance and Resources
Committee. 
REVIEW OF THE COUNCIL’S TRADE UNION CONSULTATIVE ARRANGEMENTS FOR LOCAL
GOVERNMENT EMPLOYEES 
4. There was submitted a report by Chief Officer (People Resources) (1) providng details on the Joint
Consultative Committee (JCC) currently operates; (2) proposing a full review of the JCC be undertaken
involving current Members of the Committee and appropriate Council Officers; (3) intimating that the JCC
was an integral part of the make-up and operation of the consultative and collective bargaining process for
the Council; (4) intimating that a report setting out recommendations, attaching on the updated constitution,
and clarifying the business and authority of the committee together with the responsibilities and expected
behaviours of all Members of the JCC; and (5) seeking approval of the Facility Time allocated to the relevant
trade unions with immediate effect to enable a stronger, more robust form of partnership working. 
Page 10 of 376

Page 11

JOINT  CONSULTATIVE  COMMITTEE  FOR  LOCAL  GOVERNMENT  EMPLOYEES  - 
10 DECEMBER 2024 
Decided: 
(1) that a review of all current consultative arrangements be undertaken, a Trade Union Recognition
Agreement be created and signed by the trade unions and the Council representatives review, be
agreed;
(2) that it be noted that the JCC remains an integral part of the make-up and operation of the
consultative and collective bargaining process within North Lanarkshire. 
(3) that the review of the current constitution, operation and business of the JCC be undertaken; 
(4) that a sub-group of the Joint Consultative Committee progress the review; 
(5) that a report would be submitted to the future meeting of the Committee attaching an updated
Committee constitution, outlining the business, authority and the responsibilities and expected
behaviours of all Members of the Committee, be authorised; and 
(6) that the Facility Time, arrangements as set in the report, be allocated to the relevant trade unions
with immediate effect to enable a stronger, more robust form of partnership working, be agreed. 
The Convener declared the meeting closed at 2.30pm.
Page 11 of 376

Page 12

Page 12 of 376

Page 13

North Lanarkshire Council
Report 
Does this report require to be approved? ☐ Yes  ☒ No
Ref AA    Date 26/02/25 
From Archie Aitken, Chief Officer (Legal and Democratic) 
E-mail AitkenA@northlan.gov.uk Telephone 07939 280102 
Executive Summary
This report provides details of Freedom of Information (FOI) and Environmental Information
(EIR) requests received by the Council during 2023/24 and provides further comparative
and ancillary information. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the contents of the report. 
The Plan for North Lanarkshire
Priority Enhance participation, capacity, and empowerment across our
communities
Ambition statement (20) Improve the involvement of communities in the decisions,
and development of services and supports, that affect them
Programme of Work Statutory / corporate / service requirement 
Finance and Resources Committee
Annual Freedom of Information Report Financial Year 2023/2024
Item 3
Page 13 of 376

Page 14

1. Background 
1.1 The Freedom of Information (Scotland) Act 2002 and the Environmental Information
(Scotland) Regulations 2004, provide rights to the public to ask for and be provided with
recorded information held by public authorities. The Environmental Information
(Scotland) Regulations 2004, sit alongside the FOI legislation and govern access to
environmental information such as planning matters. contaminated land, emissions etc.
Once a FOI or EIR request is received, the Council has in most cases, 20 working days
to provide the information asked for, or explain why it cannot be provided. If the Council
does not respond, or the requester is unhappy with the response, the requester can
ask for an internal review. If the requester is still dissatisfied following the internal
review, they can then appeal to the Scottish Information Commissioner. This report
provides a breakdown of the requests, internal reviews and appeals to the Scottish
Information Commissioner processed by the Council in 2023/24.
2. Report 
2.1 In financial year 2023/24 the Council received 1,780 requests for information. This
consisted of 1,408 FOI requests and 372 EIR requests. 
2.2 The 2023/24 request total of 1780 is the highest number of requests received by the
Council in a single year. It also represents a 10.5% increase on the 2022/23 total of
1,611 and a 26% increase on the 2021/22 total of 1412. This high number of requests
is reflected nationally. The Scottish Information Commissioner states in his annual
report that 95,361 requests were received by Scottish public authorities in 2023/24 and
this is the highest reported yearly total since they began collecting statistics. 
2.3 Following the 2022/23 Scottish Government consultation on access to information
rights. The Scottish Government has set out it’s FOI policy objectives for 2024 - 2026.
The objectives are to be taken forward in the following 3 workstreams: -
Workstream 1 - consideration and use of Scottish Ministers’ powers to extend coverage
of the Freedom of Information (Scotland) Act.
Workstream 2 - updating statutory guidance for Scottish public authorities.
Workstream 3 - maintaining full FOI coverage of public sector in Scotland. 
2.4 Any changes to FOI legislation or statutory guidance resulting from these  workstreams 
will be reported to future meetings of the Finance and Resources Committee. 
2.5 Of the FOI and EIR requests received in 2023/24 most were recorded as being received
from "Public and Other" (39%). These are requests from members of the public and
requests that have no identifiable affiliation to a particular organisation, group or
company. The next largest category of requests was those received from elected
representatives ie. Councillors, MPs, MSPs and parliamentary researchers acting on
their behalf (15%). 14% of requests were from businesses and commercial enterprises,
14% came from the media and 7% came from solicitors acting on behalf of a client.
These figures broadly reflect the distribution and proportion of requests recorded under
these categories in 2022/23. 
2.6 In 2023/24, 24 requests for internal review of the original decision were received.
Despite the increase in requests this year, this total is only slightly higher than the
22 requests for review received in 2022/23. The 24 requests received for internal
review represents 1.3% of the total number of requests received by the Council. This
proportion is consistent with that seen last year and is lower than the national figure
reported by the Scottish Information Commissioner of 3% of requests resulting in an
internal review.   Page 14 of 376

Page 15

2.7 Of the 24 internal reviews, in 21 cases the original decision was either wholly or partially
upheld or deemed compliant. In 1 case the original decision was overturned and
received a fresh decision at review. 1 review was undertaken because there was no
response to the original request and 1 internal review was withdrawn.
2.8 One request received in 2023/24 was appealed by the requester to the Scottish
Information Commissioner. This appeal is still being considered by the Commissioner
and the outcome will be reported in next year’s report. 
2.9 Of the 1,780 requests received in 2023/24, 25 were not fully progressed due to factors
such as clarification required to progress the request not being received or the
requester withdrawing their request. Of the remaining 1,755 requests that were fully
progressed, 1,732 (98.7%) were responded to within the statutory 20 working day
deadline. This compares with a compliance rate of 98.7% in 2022/23 and 98.5% in
2021/22. The 2023/24 compliance rate broken down by quarter is as follows: - 
Quarter 1 - 98.3%
Quarter 2 - 98.6%
Quarter 3 - 99%
Quarter 4 - 98.8% 
3. Measures of success
3.1 The Scottish Information Commissioner's self-assessment toolkit for public authorities
on responding to requests on time considers a response rate to requests of 96-100%
as excellent, 85-95% as good, 80-84% as adequate and less than 80% as
unsatisfactory. 
4. Supporting documentation
Appendix 1 – total number of requests received under either the Freedom of Information
(Scotland) Act 2002 or the Environmental Information (Scotland) Regulations 2004
broken down by month. 
Appendix 2 – an indication of the category of applicant.
Appendix 3 – details of cases submitted for internal review. 
Archie Aitken
Chief Officer (Legal and Democratic) 
Page 15 of 376

Page 16

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts been discussed and agreed with
Finance?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal
data?
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk
Yes ☐ No ☐  
Page 16 of 376

Page 17

5.6   Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes   ☐ No ☒
If Yes, please provide a brief summary of the impact?
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact   
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 17 of 376

Page 18

Appendix 1 NORTH  LANARKSHIRE  COUNCIL 
REQUESTS  RECEIVED  UNDER  THE  FREEDOM  OF  INFORMATION  (SCOTLAND)  ACT  2002/ENVIRONMENTAL 
INFORMATION  (SCOTLAND)  REGULATIONS  2004 
Applications Received 2023/2024 Month Ending 31 March 2024 
Apr May Jun Jul Aug Sep Oct Nov Dec
2023
Jan
2024
Feb Mar Total
FOI Requests 95 122 94 112 107 127 141 139 83 159 114 115 1408
EIR Requests 30 33 31 29 18 32 20 28 22 58 36 35 372
TOTAL – 2023/2024 125 155 125 141 125 159 161 167 105 217 150 150 1780 
Applications Received 2011/2012 – 2022/2023 
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total
TOTAL – 2022/2023 129 137 116 110 133 111 128 162 93 168 175 149 1611
TOTAL – 2021/2022 91 138 131 121 120 105 129 166 67 107 121 116 1412
TOTAL – 2020/2021 66 74 117 143 107 108 107 154 90 86 102 91 1245
TOTAL – 2019/2020 146 141 126 150 138 116 127 146 83 138 131 94 1536
TOTAL – 2018/2019 125 109 132 154 133 138 170 143 91 195 125 137 1652
TOTAL – 2017/2018 111 101 122 128 145 92 163 167 79 137 155 134 1534
TOTAL – 2016/2017 119 127 105 128 113 120 110 142 99 148 131 151 1493
TOTAL – 2015/2016 111 94 124 109 102 107 133 127 58 119 135 126 1345
TOTAL – 2014/2015 117 112 93 150 120 91 125 113 93 145 103 126 1388
TOTAL – 2013/2014 86 87 88 125 97 79 91 77 71 159 101 108 1169
TOTAL – 2012/2013 84 96 85 114 86 89 167 113 74 124 105 103 1240
TOTAL – 2011/2012 66 75 100 127 89 96 98 107 79 132 139 118 1226
Page 18 of 376

Page 19

Appendix 2 FREEDOM  OF  INFORMATION  (SCOTLAND)  ACT  2002
ENVIRONMENTAL INFORMATION (SCOTLAND) REGULATIONS 2004 
Requests by type of Requestor  -  2023/2024 
Media Solicitor
(on
behalf
of  
client)
Commercial
/Private
Enterprise
Voluntary /
Campaign
Organisation
Elected
Representative
(MP, MSP,
Councillor)
Trade
Union
Academic /
Student
Public
& Other
Total
April 14 7 9 4 17 1 2 71 125
May 20 10 32 8 29 4 4 48 155
June 16 9 17 10 20 1 2 50 125
July 34 11 22 10 32 0 1 31 141
August 17 11 13 6 18 2 2 56 125
September 20 8 16 10 34 3 1 67 159
October 20 11 21 10 25 5 0 69 161
November 23 16 23 8 41 1 2 53 167
Dec – 23 13 6 25 7 10 2 0 42 105
Jan – 24 24 16 37 10 23 2 1 104 217
February 24 11 21 2 12 0 3 77 150
March 21 10 20 11 7 2 3 76 150
Total 246 126 256 96 268 23 21 744 1780 
Page 19 of 376

Page 20

Requests by type of Requestor  -  2014/2015 – 2022/2023 
Media Solicitor
(on
behalf
of  
client)
Commercial
/Private
Enterprise
Voluntary /
Campaign
Organisation
Elected
Representative
(MP, MSP,
Councillor)
Trade
Union
Academic
/ Student
Public
&
Other
Total
2022/2023 217 97 247 93 277 17 29 634 1611
2021/2022 169 117 246 79 138 15 35 613 1412
2020/2021 119 143 212 62 165 8 19 517 1245 
2019/2020 277 110 278 75 149 29 42 576 1536 
2018/2019 334 137 277 93 147 34 27 603 1652 
2017/2018 260 131 268 86 192 36 25 536 1534 
2016/2017 227 181 223 68 187 24 19 564 1493 
2015/2016 217 193 192 54 168 14 19 488 1345 
2014/2015 264 164 211 56 115 17 28 533 1388
Page 20 of 376

Page 21

Appendix 3 
Freedom Of Information (Scotland) Act 2002  
Environmental Information (Scotland) Regulations       
2023/24 - Requests for Review of Original Decision. 
Received Expiry Response Subject Decision
16/5/23 14/6/23 14/6/23 Car park at School Overturned 
17/5/23 15/6/23 15/6/23 Home Working Withdrawn
19/5/23 19/6/23 16/6/23 Parking Tickets and Fines Upheld (Wholly)
13/6/23 11/7/23 11/7/23 Family Member Upheld (Wholly)
19/6/23 17/7/23 21/7/23 Education Provision Upheld (Partial)
24/7/23 22/8/23 22/8/23 Nursing Home Upheld (Partial)
17/8/23 14/9/23 14/9/23 Drumpellier Av, Coatbridge Upheld (Wholly)
23/8/23 20/9/23 28/9/23 Probationary Teachers Upheld (Partial)
23/8/23 20/9/23 28/9/23 Probationary Teachers Upheld (Partial)
23/8/23 20/9/23 28/9/23 Probationary Teachers Upheld (Partial)
18/9/23 16/10/23 16/10/23 Phased Retirement Upheld (Partial)
5/10/23 2/11/23 2/11/23 EL and Childcare Upheld (Wholly)
3/11/23 4/12/23 14/12/23 School Deferral Upheld (Partial)
11/12/23 12/1/24 12/1/24 Council Staff Upheld (Wholly)
11/12/23 12/1/24 11/1/24 Appraisal Exercise Upheld (Wholly)
11/12/23 12/1/24 12/1/24 Council Staff Upheld (Partial)
12/12/23 15/1/24 15/1/24 Morningside Road Compliant with EIR
21/12/23 24/1/24 24/1/24 Reading Test Upheld (Wholly)
9/1/24 6/2/24 7/2/24 Primary Education Upheld (Wholly)
19/2/24 18/3/24 13/3/24 Pavement Parking Upheld (Partial)
28/2/24 27/3/24 27/3/24 Employment Tribunals Upheld (Wholly)
5/3/24 3/4/24 3/4/24 School Walking Route 1st time decision
21/3/24 19/4/24 16/4/24 Broomknoll Street, Airdrie Upheld (Wholly)
26/3/24 24/4/24 24/4/24 School Compliant with EIR
Page 21 of 376

Page 22

Page 22 of 376

Page 23

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    EK / GT Date 26/02/25 
Revenues and Benefits Update 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail KempE@northlan.gov.uk Telephone 01698 302408 
Executive Summary
This report provides an update on the performance within the Revenues and Benefits
functions of Finance as at 31 December 2024. 
Key points to note include: 
• As at 31 December 2024, 81.74% of Council Tax due for 2024/25 had been
collected. This is a marginal reduction from the same period last financial year
(0.07%). 
• Non-Domestic Rates collection at 31 December 2024 is 81.00% of the total annual
charge. This is an increase of 16.74% from the same period last financial year. 
• The service continues to meet statutory timescales for administering benefits
applications and changes of circumstance. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the content of the report. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work Statutory / corporate / service requirement
Item 4
Page 23 of 376

Page 24

1. Background 
1.1 The Finance service is responsible for the administration and collection of all local
taxation in North Lanarkshire in the form of Council Tax and Non Domestic Rates. 
1.2 In addition, the service administers a number of benefits for residents of North
Lanarkshire including Housing Benefit, Council Tax Reduction, Scottish Welfare Fund,
Discretionary Housing Payment, Free School Meals, Clothing Grants and Blue Badges. 
2. Report  
Council Tax 
2.1 The graph below shows the cash collected at 31 December for each financial year. It
is worth noting that cash is allocated to specific Council Tax years so the graph
represents cash received against the initial billing year (i.e. billed and received in
2024/25) and does not include cash collected in subsequent years (i.e. billed in 2023/24
but received in 2024/25). This ensures a like for like comparison. 
2.2 The collection figure to 31 December in the 2024/25 financial year of 81.74% is 0.07%
lower than the same period last financial year. 
2.3 It should be noted that in-year collection of Council Tax is a Statutory Performance
Indicator. However, it does not reflect the overall collection rate of Council Tax which
includes collection of prior year arrears. This latter measure has a greater bearing on
the Council’s finances and is reflected in the regular budget monitoring reports to
Committee. 
2.4  Members of the Committee may aware of the recent Accounts Commission report
highlighting their findings following a significant Council Tax fraud experienced at
Aberdeen City Council. The Accounts Commission has since written to location
authority Chief Executives and Directors of Finance highlighting the case as a
‘cautionary tale’ and reminding key officers of the need to ensure fundamental internal
controls are operating effectively. The Council’s response to review internal controls
within the Council Tax system is outlined in the briefing note attached at Appendix 1 .
The briefing note should provide assurance to the Finance and Resources Committee
80.00
81.00
82.00
83.00
84.00
85.00
2020/21 2021/22 2022/23 2023/24 2024/25
Percentage of annual billing collected
(%)
Financial Year
Council Tax Collection Rate at 31 December
Page 24 of 376

Page 25

that necessary controls are in place and that improvement recommendations proposed
by Internal Audit have been actioned. 
Non-Domestic Rates 
2.5 The following graph shows the cash collected at 31 December for each financial year: 
2.6 The collection figure to 31 December in the 2024/25 financial year is 81.00%. This
represents an increase of 16.74% compared to the same time period in 2023/24. 
Housing Benefits 
2.7 The data below highlights the Statutory Performance Indicators measuring the speed
of processing for new Housing Benefit claims and for changes in circumstances. The
table below shows the cumulative figures for the 2024/25 financial year. 
Days to Process 2023/24 2024/25
Latest
available
Scottish
average
New Claims  15 14 17
Change of Circumstances  8 11 3 
2.8 The service continues to perform well in the speed of processing for new claims
compared to the most recent Scottish average. The speed and accuracy of processing
has been commented on positively by the Department for Work and Pensions during
recent liaison discussions. 
2.9 The service also continues to meet statutory requirements for the speed of processing
changes of circumstance. To further improve efficiency the service is progressing a
number of digital related improvements such as development of the Landlord Portal
and robotic process automation for a number of high-volume tasks. 
60
65
70
75
80
85
2020/21 2021/22 2022/23 2023/24 2024/25
Percentage of annual billing collected
(%)
Financial Year
Non Domestic Rates Collection Rate at 31
December
Page 25 of 376

Page 26

Council Tax Reduction Scheme 
2.10 As at 31 December 2024 a total of £26.237m in Council Tax Reduction has been
awarded for the 2024/25 financial year. This compares to £26.036m to the same period
during 2023/24, representing an increase of £0.201m (0.77%). 
2.11 The service received 5,057 applications between 1 April and 31 December 2024
compared with 5,653 during 2023/24, representing an decrease of 11.8% 
2.12 The service received an increased number of notifications for changes in
circumstances. From 1 April to 31 December 2024 a total of 107,385 changes were
processed compared to 81,561 for the previous financial year; an increase of 31.7%. 
Discretionary Housing Payments (DHP) 
2.13  From 1 April 2017 funding for DHP has been devolved to Scottish Government. This
funding supports both the Scottish Government’s commitment to fully fund the
implications of the Bedroom Tax and an additional sum available for other reasons such
as the Benefit cap and the restrictions on Local Housing Allowance rates. 
2.14 From 1 January 2023 the Scottish Government is fully funding the implications of
mitigating the benefit cap. This was announced as part of the tackling child poverty
delivery plan ‘Best Start, Bright Futures’ in March 2022. Local authority Leaders have
agreed to fuller benefit cap mitigation through the DHP scheme from 1st January 2023.
For 2024/25 the Scottish Government has provided ring-fenced funding of £0.436m to
mitigate the benefit cap.  As at 31 December, the amount paid and committed in respect
of the benefit cap was £0.057m (13%). 
2.15 As at 31 December 2024 the total paid and committed in respect of Bedroom Tax was
£5.955m. In comparison, this sum was £5.715m at the same point during 2023/24. 
2.16 In addition the Council also receives £0.459m in respect of non-bedroom tax related
issues. An additional £0.051m has been received for 2024/25 due to a redistribution of
collective unused funds for 2023/24 bringing the total budget to £0.511m. As at 31
December 2024 £0.365m (72%) has been paid or committed from the fund. 
2.17 As in previous years, the service continues to liaise with colleagues in Housing and
Housing Associations to encourage applications to the fund. In addition, the service will
also liaise with Universal Credit claimants affected by the benefit cap who could
possibly be eligible for the mitigation. 
Scottish Welfare Fund 
2.18 The Council has administered the Scottish Government’s Scottish Welfare Fund (SWF)
since 1 April 2016. 
2.19 The Scottish Government provides an annual award budget of £2.760m to North
Lanarkshire Council. In December, the Scottish Government confirmed additional one-
off funding for the SWF. North Lanarkshire’s share of that additionality is £1.361m with
a further £0.194m to support increased administration costs. It is anticipated that this
additional funding will eliminate the risk of overspend previously highlighted given the
ongoing high demand and the ongoing intent of the Council to avoid assessing
applications at the high and most compelling priority. 
Page 26 of 376

Page 27

2.20 However, despite the additional funding, the Council will be required to continue
assessing applications at High priority. This means that applications will only be
considered where there is immediate and severe need, applicants are highly
vulnerable, where there will be significantly adverse impacts to health and wellbeing
with a no grant award and where the effect of the grant is immediate and substantial.
Staff assessing Scottish Welfare Fund applications are highly trained in making these
judgements in accordance with the statutory guidance and where an application is
unsuccessful they will signpost the applicant to other community based supports. 
2.21 There are two grant schemes and their relative performance during 2024/25 and prior
year comparison is as follows: 
2024/25 
Applications
Assessed
Awards Unsuccessful
Applications
Acceptance
Rate
Crisis Grants 14,667 10,463 4,204 71.3%
Community Care
Grants
4,064 2,798 1,266 68.8%
Total 18,731 13,261 5,470 70.7% 
2023/24 
Applications
Assessed
Awards Unsuccessful
Applications
Acceptance
Rate
Crisis Grants 15,050 11,285 3,735 75.1%
Community Care
Grants
4,179 3,416 763 81.7%
Total 19,199 14,701 4,498 76.6% 
2.22 As at 31 December 2024, the total financial value of grants paid from the Scottish
Welfare Fund amounted to £2.755m which represents 66.9% of the total revised budget
for the current financial year. 
2.23 During 2024/25, the Scottish Welfare Fund has seen an decrease in demand for Crisis
applications of 2.5% and an decrease in demand for Community Care Grant
applications of 2.8%. These reductions in demand should be considered in the context
of historically high applications numbers experienced during 2023/24. The lower
acceptance rates are reflective of the move to High priority levels for the current
financial year meaning a number of residents have not been eligible for support. 
2.24 The Service strives to assess applications within the timescales outlined within Scottish
Government guidance. Throughout the period the service has largely continued to
assess Crisis applications within the two working day time limit. It has been more
challenging to meet the 15 working day time limit for Community Care Grants with the
service currently assessing applications outwith that timeframe, however, the service
fastracks applications linked to homelessness to support the wider Rapid Rehousing
and Homes First strategies. 
Clothing Grants and Free School Meals 
2.25 The Finance service administers Clothing Grant payments and applications for Free
School Meals on behalf of the Council for families meeting low-income eligibility criteria. 
2.26 Up to 31 December 2024 the service administered and paid out 11,711 Clothing Grants
compared to 11,657 by the end of December 2023. 
Page 27 of 376

Page 28

2.27 The Service awarded 10,167 Free School Meal applications to 31 December 2024
compared to 10,217 to the same period in 2023. 
2.28 From 20 February 2025, Free School Meal eligibility has been expanded to include P6
and P7 pupils eligible for the Scottish Child Payment. The Council’s online form has
been updated to reflect the updated eligibility criteria and a social media campaign has
been ongoing to ensure parents and carers are aware of the expansion of the scheme. 
Blue Badges 
2.29 The Finance service administers the Blue Badge scheme in accordance with Scottish
Government guidance. The eligibility criteria means that some are automatically
entitled to a Blue Badge. In other cases, the Council assesses an individual’s eligibility
which may include the requirement for a mobility assessment and meeting a healthcare
professional. 
2.30 As at 31 December 2024, the service administered 8,690 Blue Badge applications with
7,793 awarded (89.7% award rate). Over the same period in the 2023/24 financial year
the service administered 7,327 applications with 6,236 awarded (85.1% award rate). 
2.31 Scottish Government guidance states that applicants should receive a decision on their
application in around 12 weeks. The Council is currently reaching a decision within 4
weeks. 
3. Measures of success 
3.1  Continuous improvement in processing and collection rates.   
4. Supporting documentation 
Appendix 1 – Briefing Note - Accounts Commission – Aberdeen City Council fraud
findings 
Elaine Kemp
Chief Officer (Finance) 
Page 28 of 376

Page 29

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 29 of 376

Page 30

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
The Service has been liaising with Business and Digital on the Landlord Portal and
RPA developments and these will be managed in line with Business and Digital’s
available resources. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC).  
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 30 of 376

Page 31

APPENDIX 1
BRIEFING NOTE
From:   Finance
Subject: Accounts Commission – Aberdeen City Council fraud findings
Date:   January 2025
Background
On 9 January 2025, the Accounts Commission published its findings following audit work on
a significant Council Tax refund fraud at Aberdeen City Council. 
Over a 17 year period an employee transferred 655 Council Tax refund payments totalling
£1.109m into his own bank account. The Accounts Commission has highlighted that while this
particular fraud was complex, there were weaknesses in Aberdeen City Council’s internal
controls allowing the fraud to continue over a prolonged period. The perpetrator essentially
had unsupervised authority to issue Council Tax refunds of up to £3,000. The internal control
failures identified included lack of segregation of duties and monitoring in relation to Council
Tax refunds. 
Following publication of their report, the Accounts Commission has now written to Chief
Executives and Directors of Finance highlighting this case as a ‘cautionary tale’ and reminding
local authorities to consider whether fundamental internal controls are operating effectively
(Appendix A). 
Internal Audit Response
Following press interest in the Aberdeen City Council in June 2024, the Council’s Internal Audit
function engaged with the Finance service immediately and agreed that Internal Audit would
conduct a review of the Council’s controls around Council Tax refunds for a future report to
the Audit and Scrutiny Panel. 
Work on the review commenced in July 2024 with the audit report finalised in October 2024
(see Appendix B). 
The audit review sought to gain assurance that the financial controls and processes in place
for making refunds to council tax payers were sufficiently robust and considered a number of
areas of potential risk including:
• How, and by whom, bank details on council tax payers accounts can be amended and
updated; 
• Whether amendments to council tax payers bank details need to be authorised or
verified by a second officer;
• How, and by whom, overpayments are flagged for refund, and any limitations on the
value of refunds permitted; and
• Whether there are any second officer checks on proposed refunds, including adding
or deleting approved refunds, and the extent to which this process ensures bank
details are correct prior to the refund being made. 
The audit review concluded that ‘reasonable assurance’ was in place. The sample of refunds
paid reviewed were made to the correct council tax payers and for the correct amount with no
indication of any fraudulent activity. Internal Audit made one medium category
recommendation. This recommendation highlighted that processes in relation to council tax
refunds and requests for creditors references could be strengthened to further enhance the
controls in place. 
Page 31 of 376

Page 32

APPENDIX 1
BRIEFING NOTE
Finance Response
The Finance service’s management response to the audit review agreed to review current
processes and the availability of exception reporting by January 2025. 
The service has since updated its procedures to restrict access to requests for creditors
references, created and documented an authorisation process for requesting significant
refunds, reviewed the process for second officer checks (including assessing management
screens to ascertain whether bank account details have been changed) and updated existing
procedure manuals.
System limitations prevent complete segregation of duties across each part of the process but
additional checks have been introduced prior to the creation of a creditors reference and prior
to the authorisation of a refund payment run to ensure payment requests are accurate and
appropriate. At no point can a North Lanarkshire Council officer have unsupervised authority
to issue Council Tax refunds in the way previously experienced in Aberdeen City Council. 
The agreed implementation date for Management action was January  2025 and as such has
not yet been subject to Internal Audit’s formal follow up process. This will be undertaken in
line with Internal Audit’s established timeline for follow up at which time they will consider if
management action has sufficiently mitigated the risk identified.
Accounts Commission Recommendation
The Accounts Commission’s letter of 10 January (see Appendix A) urges councils to consider
whether the following fundamental internal controls are operating effectively:
1. Segregation of duties: ensuring access to systems are restricted to appropriate levels
(to negate the possibility of individuals processing transactions all the way through the
payments process). 
2. Reconciliations: ensuring feeder systems are effectively reconciled to other systems
(e.g. general ledger); using third party information (suppliers’ statements) and
reconciling with payment systems. 
3. System documentation: system documentation should be maintained which details
key controls to be carried out by staff to prevent fraud or error.
4. Monitoring: scrutiny should be at a level that would allow managers to identify
anomalous payments at an early stage. 
5. Counter-fraud arrangements: refresh and promote the counter-fraud policy with staff. 
Items 1 to 4 above were covered by the audit review completed in October 2024 and reported
to the Audit and Scrutiny Panel on 31 October 2024, ensuring elected member oversight. 
In relation to Item 5, counter fraud is a Council-wide policy owned by Audit and Risk. The
policy was updated in September 2023 and most recently promoted to staff through an email
staff announcement on 4 October 2024 (see Appendix C).
Conclusion
Prior to the Accounts Commission publishing its findings on the significant council tax fraud in
Aberdeen City Council, North Lanarkshire had already concluded its own audit review
highlighting ‘reasonable assurance’ and implemented recommendations aimed at
strengthening the Council’s own processes, albeit the implementation is still subject to final
review by Internal Audit. This internal review and promotion of the existing counter fraud policy
has ensured the Council has covered points raised by the Accounts Commission. 
Page 32 of 376

Page 33

4th Floor
102 West Port
Edinburgh  EH3 9DN
T: 0131 625 1500
E: info@audit-scotland.gov.uk
www.audit-scotland.gov.uk 
To All Chief Executives            10 January 2025 
Copied to: Directors of Finance; External auditors 
Dear Chief Executive, 
You may be aware that, on 12 December, the Accounts Commission considered a report from
the Controller of Audit (under powers in s102 (1) of the Local Government (Scotland) Act 1973)
in relation to a significant council tax refund fraud perpetrated against Aberdeen City Council.
In her remarks to the Commission, the Controller made the point that this case should act as
a “cautionary tale”. In response, the Commission decided that, in addition to publishing
findings (which can be found here), it would be important to share with all Chief Executives,
copying in relevant local government professional networks, the lessons the sector as a whole
can learn from Aberdeen City’s experience. 
As finances get tighter and decisions are taken to rationalise back-office functions to protect
front line services for our communities, it is critical that your staff across all functions have and
implement effective financial controls, which safeguard public assets, irrespective of the level
of income and expenditure involved. 
While this particular fraud was complex, weaknesses in the council's internal controls allowed
the fraud to continue over a prolonged period. Controls exist to safeguard both the employees
and the employer. In this case, failure to implement controls and a lack of monitoring enabled
an abuse of authority which, when combined with a detailed operational knowledge, provided
the opportunity to withdraw funds inappropriately. 
This should serve as a timely reminder for all councils to consider whether the following
fundamental internal controls are operating effectively:   
• segregation of duties: ensuring access to systems are restricted to appropriate
levels (to negate the possibility of individuals processing transactions all the way
through the payments process).  
• reconciliations: ensuring feeder systems are effectively reconciled to other
systems (e.g. general ledger); using third party information (suppliers’ statements)
and reconciling with payment systems.  
• system documentation: system documentation should be maintained which
details key controls to be carried out by staff to prevent fraud or error.  
• monitoring: scrutiny monitoring should be at a level that would allow managers to
identify anomalous payments at an early stage. 
• counter-fraud arrangements: refresh and promote the counter-fraud policy with
staff. 
Page 33 of 376

Page 34

It is your responsibility to ensure that such arrangements are in place to help assure elected
members and the public that risks are being identified and managed effectively. I would
encourage you all to use the annual governance statement as an opportunity to take stock of
the key controls and processes and whether self-assessment procedures are sufficient to
provide elected members and officers with the required assurances. Internal and external
auditors have an important role to play in helping public bodies assess their control
environment and evaluating the effectiveness of controls, but they are not responsible for
identifying all instances of fraud. 
If you have any questions or queries in relation to the report on the Aberdeen City Council case
specifically or on any other aspect of the Commission’s work, please do not hesitate to email
acsupport@audit-scotland.gov.uk 
I look forward to engaging with you during 2025. 
Yours sincerely, 
Jo Armstrong
Chair, Accounts Commission 
Page 34 of 376

Page 35

https://nlcgov.sharepoint.com/sites/aur-internalauditfiles/shared documents/unplanned work/2024-25/council tax refund fraud (aberdeen city council)/a - findings and
report/a06a 20241002 council tax refunds - final report as issued.docx 
INTERNAL AUDIT REPORT 
COUNCIL TAX REFUNDS 
Contents  
1. Executive Summary 2. Findings and Recommendations 3. Action Plan
Appendix 1:   Audit grading  
Issued to: Chief Officer (Finance) and Business Finance Manager   Copied to: Chief Executive 
Headlines
This review was a short, focussed exercise designed to provide assurance that the Council’s financial controls
and processes in place for making refunds to council tax ratepayers are sufficiently robust to ensure that
refunds are correctly raised, authorised and paid.  This exercise has been carried out in response to an incident
at Aberdeen City Council whereby a Team Leader within the council tax team was identified, and convicted, of
embezzling more than £1m from council tax refunds.  
In the period January to June 2024, the Council has processed over 5,000 council tax refunds across many
liability years amounting to over £900,000. All refunds are paid via the creditors system with 55% of these paid
by bank transfer and 45% by cheque sent to the ratepayer’s address. Established processes are in place within
the council tax team to identify, review and process refunds to council tax ratepayers.
We have categorised this audit as offering ‘reasonable assurance’ as we are generally satisfied that the
arrangements in place for processing council tax refunds are generally robust.  From our review of a sample of
requests for Cedar references and refunds paid, we were pleased to note that the processes in place are
consistent with the expected procedures, and we consider that all refunds reviewed were made to the correct
ratepayers for the correct amount.  Although there is no indication of any fraudulent activity in relation to council
tax refunds, we identified a gap within the current control environment that could lead to the potential for a
fraudulent payment to be made.  As such, we have identified some areas where the processes in relation to
council tax refunds and requests for creditors references could be strengthened to further enhance the controls
in place. These are detailed in the action plan at section 3 of this report for management consideration. 
Internal Audit Opinion (see definition at Appendix 1) Reasonable Assurance (Green-Amber) 
Organisational impact (see definition at Appendix 1) Moderate 
Report Status FINAL Audit Ref 0200/2025/004 Date issued 02/10/2024
Audit Team Elaine MacDonald and Lesley Armstrong 
Page 35 of 376

Page 36

https://nlcgov.sharepoint.com/sites/aur-internalauditfiles/shared documents/unplanned work/2024-25/council tax refund fraud (aberdeen city council)/a - findings and
report/a06a 20241002 council tax refunds - final report as issued.docx
1.  Executive Summary 
Objectives
The purpose of this exercise was to gain assurance that the Council’s financial controls and processes in place
for making refunds to council tax ratepayers are sufficiently robust, and considered the following key areas of
potential risk:
• how, and by whom, bank details on council tax ratepayers’ accounts can be amended and updated;  
• whether amendments/updates to ratepayers’ bank details need to be authorised or verified by a second
officer;   
• how, and by whom, overpayments are flagged for refund, and any limitations on the value of refunds
permitted; and
• whether there are any second officer checks on proposed refunds, including adding or deleting approved
refunds, and the extent to which this process ensures bank details are correct prior to the refund being
made.  
Testing involved establishing the processes and procedures in place for identifying, raising, authorising and
paying refunds on council tax accounts and sample checking to confirm whether these processes were
operating as expected.
This engagement has been conducted in accordance with the ‘Public Sector Internal Audit Standards’.  The
Internal Audit section reports formally on conformance with these standards to the Audit and Scrutiny Panel. 
2.  Findings and Recommendations 
Number and category of recommendations raised
(see definition of priority at Appendix 1) 
High Medium Low
0 1 0 
Key areas requiring management action (High)
No areas requiring urgent management action were identified. 
Good practice identified
We noted the following areas of good practice during the audit:
• Refunds are only made where an overpayment on a taxpayer’s account has been verified as properly due
and that there are no other outstanding balances in the taxpayer’s name against which to offset the
overpayment;
• All refunds are processed via the creditors system in eFinancials and a Cedar reference must be created
for each council tax ratepayer to enable these payments to be made;
• All users flagging council tax accounts for refund were recognised council tax staff with suitable authority
to do so; and
• Prior to each refund payment run being made, a prelist report of refunds due is run and reviewed for
accuracy, and any adjustments to delete proposed refunds are made. A final revised extract is then
produced and sent to the Creditors team, together with an email from an authorised signatory, for payments
to be processed. 
Other areas for improvement (Medium)
Other areas for improvement were identified:
• processes in relation to council tax refunds and requests for creditors references could be strengthened to
further enhance the controls in place. 
Page 36 of 376

Page 37

https://nlcgov.sharepoint.com/sites/aur-internalauditfiles/shared documents/unplanned work/2024-25/council tax refund fraud (aberdeen city council)/a - findings and report/a06a 20241002 council tax refunds - final report as issued.docx
3. Action Plan Council tax refunds 0200/2025/004 
Ref Finding
1 Processes in relation to council tax refunds and requests for creditors references could be strengthened to further enhance the controls in
place.
Refunds on council tax accounts with credit balances are generally raised as a result of a change in the circumstances which has resulted in a reduction in their council tax liability or
where the account has a credit balance and the ratepayer has requested a refund.   In cases where a refund is properly due, council tax staff ‘flag’ the ratepayer’s account as being
due a refund, and as refunds are processed through the creditors system, checks whether the ratepayer has a creditors (Cedar) reference.  Where the ratepayer does not have an
existing Cedar reference, council tax staff record the personal details of the ratepayer (including bank details) on a spreadsheet.  On a weekly basis, the Team Leader checks the
details on this spreadsheet to Civica and passes it to Creditors, who subsequently create and advise on the Cedar reference allocated.  Upon confirmation of the Cedar reference, the
council tax team records the Cedar reference on Civica.  Twice weekly, a list of refunds flagged on the council tax system is generated and reviewed by a council tax officer.  Once
this check is confirmed a payment file is generated and a feeder authorisation is sent to Creditors to process the refunds flagged as being due for payment.
From our review of a sample of requests for Cedar references and refunds paid, we were pleased to note that the processes in place are consistent with the expected procedures and
that we consider that all refunds were made to the correct ratepayers for the correct amount.  However, we identified some areas where we consider that the processes could be
strengthened to further enhance the controls in place.  These include:
• although the council tax procedures manual includes a section on refunds, it could be enhanced by more fully detailing all aspects of the refund process and the expected checks
required at key stages; 
• the spreadsheet used for requesting Cedar references (which records name, address and bank details) is accessible to, and can be amended by, a significant number of council
tax staff;
• there is a lack of separation of duties in the refund process as council tax staff are involved in each step and have the ability to update a ratepayer’s bank details on Civica, flag a
ratepayer’s account for refund on Civica and populate the spreadsheet for requesting Cedar references;
• although a list of ratepayers’ accounts flagged for refund are subject to review by a second officer before they are passed to Creditors for payment, there is no threshold applied
to the refund value above which additional management checks or ‘authorisation’ by management is specifically required;
• we understand that a Team Leader undertakes checks on the details entered on the spreadsheet used for creating Cedar references to the details held on Civica prior to passing
the spreadsheet to Creditors, but no documentation regarding this is retained; and
• when an overpayment is identified on a ratepayer’s account, no checks to ascertain whether there have been any recent changes to the bank account details are undertaken prior
to marking the account for refund nor is a check on bank detail amendments made when the Team Leader reviews the Cedar references spreadsheet.
(continued overpage) 
Page 37 of 376

Page 38

https://nlcgov.sharepoint.com/sites/aur-internalauditfiles/shared documents/unplanned work/2024-25/council tax refund fraud (aberdeen city council)/a - findings and report/a06a 20241002 council tax refunds - final report as issued.docx
Implication Recommendation Priority Management response Implementation
Month/Year
Payment details passed to
Creditors to create new
cedar references and
creditor accounts could be
changed with the purpose
of diverting refunds to
another party.
System users having
access to multiple aspects
of the refund process
increases the risk of
fraudulent refunds being
made. 
The Chief Officer (Finance) should ensure that:
(1) a review of the process for council tax refunds is undertaken and
thereafter the council tax procedures amended and
communicated to council tax staff.  This review should include,
but not be limited to:
• restricting access to the spreadsheet for recording requests
for creditor’s references;
• identification of the stages involved and consideration of
where adequate separation of duties could be introduced;
• consideration of the introduction of a documented
authorisation process for requesting refunds where the
value of the refund is significant;
• the checks which should be undertaken prior to flagging a
ratepayer’s account for refund, including outstanding debt
and whether the ratepayer’s bank details have recently been
changed; and
• the process for undertaking second officer checks on the
creditor reference request spreadsheet prior to passing to
Creditors for actioning, including retention of documentation
confirming the checks undertaken, by whom and when.
(2) explore if any exception reports regarding relevant areas, such
as bank detail changes, can be generated and thereafter
reviewed by management to ensure that any changes made are
legitimate and supported by appropriate documentation.
Medium Agree  
Greg Telfer, Business Finance Manager 
(1) The Service will conduct a review of the current
refund process giving due consideration to
issues raised by Internal Audit, with
amendments made as appropriate/necessary.  
(2) In conjunction with the Business Development
and Performance team, the Service will review
the availability of exception reporting through
Civica for the relevant areas and assess whether
these be used to support additional checks.   
January 2025 
Page 38 of 376

Page 39

https://nlcgov.sharepoint.com/sites/aur-internalauditfiles/shared documents/unplanned work/2024-25/council tax refund fraud (aberdeen city council)/a - findings and
report/a06a 20241002 council tax refunds - final report as issued.docx
Appendix 1 - Audit Grading
Audit reports are graded with an overall assurance opinion, and any issues and associated
recommendations are classified individually to denote their relative importance, in accordance with
the definitions in the tables below. 
Definition of audit assurance and recommendation categories
Assurance Confidence based on sufficient evidence that internal controls are in place, operating
effectively and objectives are being achieved. 
Assurance opinion
Green Substantial
Assurance
A sound system of governance, risk management and control exists, with
internal controls operating effectively and being consistently applied to
support the achievement of objectives in the area audited. 
Green - Amber Reasonable
Assurance
There is a generally sound system of governance, risk management and
control in place. Some issues, non-compliance or scope for improvement were
identified which may put at risk the achievement of objectives in the area
audited.
Amber - Red Limited
Assurance
Significant gaps, weaknesses or non-compliance were identified.
Improvement is required to the system of governance, risk management and
control to effectively manage risks to the achievement of objectives in the
area audited.
Red No
Assurance
Immediate action is required to address fundamental gaps, weaknesses or
non-compliance identified. The system of governance, risk management and
control is inadequate to effectively manage risks to the achievement of
objectives in the area audited. 
Organisational impact
Major The weaknesses identified during the review have left the Council open to significant risk.  If
the risk materialises it would have a major impact upon the organisation as a whole.
Moderate The weaknesses identified during the review have left the Council open to medium risk.  If the
risk materialises it would have a moderate impact upon the organisation as a whole.
Minor The weaknesses identified during the review have left the Council open to low risk.  If the risk
materialises it would have a minor impact upon the organisation as a whole. 
Recommendation priority
High Significant control failure or weakness that, if not addressed, may lead to a major financial,
operational or reputational risk to the organisation and/or significantly impact the successful
delivery and achievement of the objectives of the area under review.  Urgent/Immediate action
is required.
Medium Control failure or weakness that, if not addressed, may lead to a moderate financial,
operational or reputational risk to the organisation.  Weakness may be individually significant
but is unlikely to affect the successful delivery and achievement of the overall objectives of the
area under review.  The risk of error would, however, be significantly reduced if corrective
action was taken.  Prompt action is required.  
Low
Control failure or weakness that may lead to a minor financial, operational or reputational risk
to the organisation.  Weakness does not appear to significantly affect the ability to meet
objectives.  Minor issue raised to improve the efficiency and effectiveness of controls. 
Page 39 of 376

Page 40

From: NLC Announcements
To: NLC - All Email Users
Subject: Staff announcement: 24/125 Prevent Fraud in North Lanarkshire
Date: 04 October 2024 15:27:01
Attachments: image001.png
Issued on behalf of Audit and Risk
The council is committed to ensuring public funds are used responsibly and preventing
fraud. We have a zero-tolerance approach and our Corporate Fraud Policy outlines how
fraud risks are managed across the organisation.
What is Corporate Fraud?
Fraud refers to the deliberate use of deception or dishonesty to disadvantage or cause
loss to another person or party and includes a wide variety of dishonest behaviour such
as theft, false accounting, embezzlement, forgery, bribery, corruption, deception, false
representation, concealment of material facts and other dishonest actions which result
in loss.  Fraud can occur within the council or can be perpetrated against the council by
outside parties.
Does this policy apply to me?
Yes, it covers all employees, elected members, service users, contractors, agencies,
suppliers, and partners, including the voluntary sector.
What can you report?
Allegations about misuse of council equipment – e.g. council employees are using
council equipment out with working hours for personal gain.
Theft or misappropriation of council assets – e.g. an expensive piece of
equipment has disappeared and there is no trace of its disposal on council
systems.
Offer or acceptance of gifts and hospitality leading to improper actions (bribery) –
e.g. your manager is in receipt of gifts and hospitality from a current contractor,
and they are providing them with additional work beyond the scope of the
contract.
Inappropriate relationships with contractors and abuse of power or position
(corruption) – e.g. favouring well known contractors and offering them first choice
of work despite not being the most value for money; and
Accessing computer systems to obtain confidential information – e.g. a colleague
is accessing confidential information and providing it to a third party.
How can you report suspected fraud?
Allegations of any suspected fraud, corruption, bribery or wrongdoing should be
reported using either of the mechanisms below:Page 40 of 376

Page 41

Completion of the Internal Fraud Reporting Form (internal employees only)
Emailing the Internal Audit team at internalaudit@northlan.gov.uk
Concerns about social security benefits should be reported directly to the Department of
Work and Pensions (DWP). Further information on reporting benefit fraud can be found
here.
Page 41 of 376

Page 42

Page 42 of 376

Page 43

North Lanarkshire Council
Report 
Does this report require to be approved? ☒ Yes  ☐ No
Ref FW/LC Date 26/02/25 
From Fiona Whittaker, Chief Officer (People Resources) 
E-mail WhittakerF@northlan.gov.uk Telephone 07973 728628 
Executive Summary
This report seeks approval of the updated and revised Employee Code of Conduct that
applies to all employee groups of the Council. The revised code reflects changes in the
organisation and underpin the direction of the Council moving forward. 
Recommendations
It is recommended that the Finance and Resources Committee:
(1)  Approves the revised and updated Employee Code of Conduct for all employees of
the Council. 
The Plan for North Lanarkshire
Priority Improve North Lanarkshire's resource base
Ambition statement (23) Build a workforce for the future capable of delivering on our
priorities and shared ambition
Programme of Work All Programmes of Work 
Finance and Resources Committee
Review of Employee Code of Conduct
Item 5
Page 43 of 376

Page 44

1. Background 
1.1 The Employee Code of Conduct was first introduced in February 2012 to ensure that
all employees of the Council understood and practiced set standards of conduct and
behaviour when employed by North Lanarkshire Council. 
1.2 Since its implementation, the Employee Code of Conduct has been reviewed to ensure
it remains fit for purpose, and over the last few years a mandatory training course has
been developed to ensure that all employees understand and practice the principles
and standards of the code. 
1.3 As the last review took place in 2022, a review took place last year resulting in several
amendments and additions to the Employee Code of Conduct that were agreed
following consultation with Senior Management of the Council and the relevant trade
unions. 
1.4 The remainder of this report sets out the main changes and a copy of the revised
Employee Code of Conduct is provided at Appendix 1. 
2. Report 
2.1 Given the ambitious direction set by North Lanarkshire Council for the next few years,
it was considered appropriate that the Employee Code of Conduct was reviewed to
ensure it remained fit for purpose. While the general wish to retain a consistent set of
high standards, applicable to all, has been maintained, the revised Employee Code of
Conduct sets out the following proposed additions and changes.
Changes/Additions
2.2 The previous Introduction is now the Foreword, and a new introduction has been
incorporated to ensure that all employees fully understand the importance of the
Employee Code of Conduct and the requirement to undertake the supporting
mandatory training. It also expands on the fact that other codes of conduct and
professional practice require to be complied with and that it links to other policies of the
Council. 
2.3 The Key Principles of the code remain the same, except for ‘Selflessness’ where an
additional sentence has been included to remind employees that decisions or actions
should be based solely on the Council’s best interests and our statutory duties to
service users/communities. 
2.4 A section has been added on ‘Mandatory Training’ to remind employees that as part of
their contract of employment they are required to undertake specific mandatory training
on a regular basis and failure to do so could result in disciplinary action being taken
against them.
2.5 Within the section regarding ‘Relationships’ a separate section on ‘Service Users’ is
now in place to remind employees about the importance of maintaining integrity and
professional boundaries when working with service users. There is also an additional
section on ‘Other Employees’ emphasising the need for employees to work
professionally together and act in a way that ensures dignity and respect for their
colleagues. This includes the professional and working relationship between managers
and employees.  
Page 44 of 376

Page 45

2.6 The current section on ‘Conduct outside of Work’ has been replaced with a much more
detailed section regarding the disclosure of legal proceedings and the impact that
failure to disclose or otherwise could have on an individual’s employment. Further
sections have been added in relation to Safeguarding and Prevent, which were not
included in previous versions of the code albeit they were implied through other
sections and the principles. 
2.7 In addition to the current section on Politically Restricted Posts, a section has been
added on ‘Political Neutrality’, again to remind employees of the relationship that should
exist between themselves and elected members. 
2.8 A new section entitled ‘Financial Responsibilities’ has been included within the code
and covers the areas of procurement, property, debt and fraud with the aim of providing
much clearer and precise detail on the expected behaviour and conduct of employees
when employed by the Council and/or involved in these issues as part of their duties
and responsibilities. 
2.9 The section on Gifts and Hospitality has been revised to emphasise the Council’s
position regarding the acceptance of Gifts and Hospitality and to provide some
guidance on what gifts are deemed reasonable to accept as this is often a question
asked from both managers and employees. This section also outlines the necessity to
comply with the relevant reporting procedures and the consequences of not doing so
or inappropriately accepting either gifts or hospitality. 
2.10 Personal Presentation has also been improved to ensure that employees fully
understand the expected standards around personal presentation and provides
examples of what is deemed unacceptable to be worn in the workplace. 
2.11 A section on ‘Identification’ has been incorporated to remind employees of the necessity
to wear their ID badge when entering any Council building and when undertaking work
for the Council. This section also reminds employees not to share their ID with any
other person including colleagues.
2.12 More detail has been provided on the purpose and use of the Whistleblowing Policy
within the code and a link is provided for employees to access should they require to
do so. 
2.13 The sections on ‘Contact with the Media’ and ‘Social Media’ have also been updated
and extended to ensure employees understand the rules around engagement with the
Media and to try and protect employees from posting information on social media that
is inappropriate and damaging to both their employment and the Council. 
2.14 Due to the confusion that sometimes arises around ‘Secondary Employment’ this
section has also been expanded to provide more detail on when it is appropriate or
otherwise to engage in secondary employment and who to contact for further
information and advice.
2.15 Lastly, a section has been included on the ‘Use of Council Equipment’ to reflect the
change in the way that employees now work and to ensure that employees understand
the necessity to look after equipment that whilst is required for their role, belongs to the
Council. There is also information on the misuse of equipment and the ramifications of
doing so.
Next Steps 
2.16 Following approval, communications will commence to all employees of the Council
alerting them to the revised Employee Code of Conduct which will be made available
on MyNL. 
Page 45 of 376

Page 46

2.17 Work will also commence on updating the current mandatory training course to ensure
that it reflects the revised version of the code. 
2.18 Finally, consideration will be given to how training on the Employee Code of Conduct
can be better presented and cascaded to frontline workers to ensure everyone is aware
of and understands the contents in the context of their employment with North
Lanarkshire Council. 
3. Measures of success 
3.1 All employees understand the behaviours and standards expected of them when
working for North Lanarkshire Council. 
3.2 Implementation of the revised Employee Code of Conduct will assist the Council in
continuing to deliver high standard, quality services to the communities of North
Lanarkshire Council. 
4. Supporting documentation 
Appendix 1 – Revised Employee Code of Conduct 
Fiona Whittaker
Chief Officer (People Resources) 
Page 46 of 376

Page 47

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts been discussed and agreed with
Finance?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☒ No ☐
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources?
Yes ☒ No ☐
If Yes, please provide a brief summary of the impact? 
It is important that all employees understand the behaviours expected of them whilst
working for North Lanarkshire Council and a precise and detailed code of conduct
prevents employees being disciplined for actions that could otherwise have been
avoided.
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal
data?
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk
Yes ☐ No ☐ 
Page 47 of 376

Page 48

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact   
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 48 of 376

Page 49

Employee Code of
Conduct
Version 4
People Resources
January 2025 
Page 49 of 376

Page 50

Employee Code of Conduct 2 
Document control
Title Employee Code of Conduct
Owner Fiona Whittaker, Chief Officer
(People Resources)
Contact Whittakerf@northlan.gov.uk
Governance Group Finance and Resources Committee
Author Linda Cullen Contact CullenLi@northlan.gov.uk 
Revision History
Number Originator Date Review Commenced Revision description/record of change
Original Code Corporate HR February 2012 Initial Code approved
1.0 Updated Code Heather Liddle 10 May 2018 Updated Code approved
2.0 Updated Code Heather Liddle 11 March 2021 Updated Code approved
3.0 Updated Code Lynn McKenzie March 2022 Updated Code approved
4.0 Updated Code Linda Cullen January 2025 Updated Code approved     
Document Approvals
Number Governance
Group
Date approval granted Date approval to be requested
(if document still draft)
Original Code Finance and
Resources
Committee
February 2012 Approved
2.0 Updated Code Finance and
Resources
Committee
March 2021 Approved
3.0 Updated Code Finance and
Resources
Committee
March 2022 Approved
4.0 Update Code Finance and
Resources
Committee
26 February 2025 
Consultation Record (for most recent update)
Status of document consulted upon Version 4 – Updated Employee Code of Conduct
Stakeholders consulted/date Trade unions (November 2024). Corporate Management Team (24 January
2025), Finance and Resources Committee (26 Feb 2025) 
Strategic Alignment
All priorities
All Programmes of Work
One Workforce Plan
(23) Build a workforce for the future capable of delivering on our priorities and shared ambitions. 
Next review date
Review Date Every two years or as necessary if there is an organisational or legislative change that requires an
update to the code.
Page 50 of 376

Page 51

Employee Code of Conduct 3 
Contents 
1. Foreword
2. Introduction
• Other codes of conduct
• Breaching the Code
• Links to other policies
3. Key Principles of the Code
4. Mandatory Training
5. Relationships
• The Public
• Service Users
• Councillors
• Other Employees
• Contractors
• Private Interests
• Conflict of Interest
6. Disclosure of Legal Proceedings
• Safeguarding
• Prevent
7. Political Neutrality
• Politically Restricted Posts
8. Privacy and Confidentiality
9. Financial Responsibility
• Procurement
• Property
• Debt/Fraud
10. Gifts and Hospitality
• Gifts
• Hospitality
11. Personal Presentation
• Identification
12. Alcohol & Drugs
13. Anti-Fraud/Whistleblowing
14. Contact with Media
15. Use of Social Media
16. Co-operation with Internal Investigations and Procedures and Litigation
17. Secondary Employment
18. Use of Council Equipment
19. Review
Page 51 of 376

Page 52

Employee Code of Conduct 4 
Foreword
The public is entitled to expect a high standard of conduct from all local
government employees.
This Code of Conduct is applicable to all persons working for North Lanarkshire
Council including all employee groups across all Services, agency workers,
seconded workers volunteers, interns and individual temporary or fixed term
contractors and sets out the standards the Council expects from you and provides
you with clear and helpful expectations. The Code incorporates existing policies,
regulations and conditions of service and provides further guidance to assist
employees in their day-to-day work.
The Council recognises that employees are diverse individuals, and for some, their
particular needs and circumstances will require to be taken into consideration, as
necessary, in relation to the Code.
The Code does not affect an employee’s rights and responsibilities under the law;
its purpose is to provide clear and helpful advice and guidance. Because of the
nature of your work, parts of the Code may apply to some employees more than
others, but all must comply with the Code. The Council recognises that employees
strive to deliver the highest standard of service, however, in the event of a breach
of the Code this may lead to disciplinary action in accordance with the Council’s
Disciplinary Policies.
It is the responsibility of each of us to make ourselves aware of and keep generally
up to date on Council policies and procedures as they affect us. Obvious examples
are health and safety requirements but there are a variety of other duties and
responsibilities, dependent on the nature of our jobs, where we need to be aware
of the Council’s expectations of us as employees. All Council policies and
procedures can be found on myNL or are available from your line manager.
If there are any areas on which you need further guidance or you have any
concerns about any aspect of the Code, you should approach your line manager
for further advice.
The Code has been updated by the Council following consultation with the
representative Trade Unions and I hope that you will find it helpful in your
employment with North Lanarkshire Council. 
Des Murray
Chief Executive
Page 52 of 376

Page 53

Employee Code of Conduct 5 
Introduction
The aim of this Code is to enhance and maintain the integrity of the Council and
for this purpose the Code demands very high standards of personal and
professional conduct from all, both while undertaking their duties and
responsibilities and when acting as a private individual. This Code has been
developed considering current legislative requirements, our current policies and
procedures and our key principles as detailed below. Every employee is required
to undertake the mandatory e-learning module on the Code and to ensure that
they regularly refresh their training and understanding of the Code.
Other Codes of Conduct
There are several professions that have their own Codes of Conduct and Practice,
the Employee Code of Conduct does not replace any of these codes and therefore
must be considered alongside and in addition to any professional codes.
Breaching the Code
Failure to comply with any aspect of the Employee Code of Conduct will be treated
seriously and any breach of the Code, will be fully investigated under the Council’s
relevant Disciplinary Policy and procedures and could ultimately result in
dismissal.
Links to Other Council Policies
The Employee Code of Conduct is not standalone and must be considered
alongside other professional codes applicable to your profession as well as the
other Council policies which set out behaviours required of employees listed
below: -
Acceptable use of ICT Policy
Alcohol and Drugs Policy
Disciplinary Policy and F7 Disciplinary Framework for Teachers and Associated
Professionals
Dignity at Work Policy
Sexual Harassment Policy
Equality and Diversity in Employment Policy
Equality and Diversity Policy; and
Gender Based Violence Policy
Hybrid Working Scheme
Workforce Change Policy
All the above policies are available on myNL and employees require to familiarise
themselves with them, as necessary.
Page 53 of 376

Page 54

Employee Code of Conduct 6 
Key Principles of the Code
Our Code is based on the following principles which seek to support best practice
at every level. As an organisation, we all must promote and robustly support the
principles and be willing to challenge poor behaviour wherever it occurs.
Selflessness
You should not take decisions or behave in a way which will result in any
financial or other benefit to yourself, your family, or your friends. Decisions or
actions should be based solely on the Council’s best interests and our statutory
duties to service users/communities.
Integrity
You should not place yourself under any financial or other obligation to an
individual or an organisation which might influence you in your work with the
Council.
Objectivity
Any decisions which you make in the course of your work with the Council,
including making appointments, awarding contracts, or recommending
individuals for rewards or benefits, must be based solely on merit.
Accountability
You are accountable to the Council as your employer. In turn, the Council is
accountable to the public.
Openness
You should be as open as possible in all the decisions and actions that you take.
You should give reasons for your decisions and actions and should not restrict
information unless this is clearly required by Council policy or by the law.
Honesty
You have a duty to declare any private interests which might affect your work with
the Council.
Leadership
If you are a manager, you should promote and support these principles by your
leadership and example.
Respect
You are expected to respect all fellow Council employees, Councillors and users
of Council services and always treat them with courtesy.
Page 54 of 376

Page 55

Employee Code of Conduct 7 
Mandatory Training
Every employee of the Council is required to undertake mandatory training on a
regular basis that is applicable to their duties and responsibilities and
employment with the Council. Mandatory training is compulsory and is part of
your terms and conditions of employment. Mandatory training ensures that you
have the knowledge and skills to provide a consistent, high-quality service in a
safe and effective way. Failure to complete mandatory training without
justification, could result in disciplinary action being taken against you.
Relationships
As a local government employee, you are expected to give the highest possible
standard of service to the public. You should be aware that the way you behave
during working hours may affect the reputation of the Council. You should also
remember that you are a public official and that misconduct or activities, both in
and out of work may give rise to disciplinary action and may ultimately have a
bearing on your employment with the Council.
The Public
You should always remember your responsibilities to the communities which the
Council serves and ensure courteous, efficient, and impartial service delivery to
all groups and individuals within that community. You must deal with all members
of the public in a fair, equitable and consistent manner.
Service Users
Employees should avoid unnecessary personal familiarity with service users that
they have met, in the course of their work, and should not use their position to
either take unfair advantage of members of the public who use Council Services
or allow themselves to be unduly influenced by service users. Your professional
integrity must always be maintained.
Councillors
Mutual respect between Councillors and employees is essential to good local
government. Close personal familiarity between individual Councillors and
employees can damage professional relationships between Councillors and
employees. When working with an elected member, they should be addressed as
Provost, Convener, Chair or Councillor as appropriate, although is accepted that
on a one-to-one basis, in private, other forms of address may be used depending
on how long and how well the officer and Councillor have known each other.
Although you (as an employee) and Councillors both serve the public, you have
separate responsibilities. Councillors are responsible to the people who live in
their wards, but you are responsible to the Council as your employer. You must
also respect the different roles that you and Councillors play. A Councillor’s role is
to take part in decisions on policy and other matters placed before them, not to
Page 55 of 376

Page 56

Employee Code of Conduct 8 
be involved in managing Council services; that is the role of employees. The Chief
Executive and senior employees must also help to make sure that Council policies
are in place and used properly. The Councillor’s Code of Conduct applies to all
elected members.
Our role as employees is to serve the Council in a neutral and impartial way,
providing a service to the Council and its Councillors irrespective of any personal
or political views. Particular rules apply for posts which are politically restricted in
one way or another, but this guiding principle is important irrespective of whether
our particular jobs are affected by those legal restrictions. As employees we serve
the Council as a whole and require acting in the best interests of the Council as
our employer.
The Council as a collective body has ultimate authority to make decisions on
behalf of the organisation and that authority requires to be respected. In a similar
vein, we as council employees must also afford to individual Councillors the
respect which is due to them as the holders of a democratic mandate.
Other Employees
All employees have a responsibility to act in a way that ensures dignity and respect
for their colleagues. Employees are expected to adhere to the standards of
behaviour as set out in the Council’s relevant policies and procedures and should
not discriminate against colleagues.
Employees and managers have a mutual responsibility to ensure good working
relationships and either party should ensure that they are always professional
and behave courteously, reasonably, and fairly in all dealings with the other party.
Contractors
You must be fair and impartial in your dealings with contractors, sub-contractors,
and suppliers. If you are involved in the tendering process, you must follow the
Procurement Strategy and General Contract Standing Orders. If you have access
to confidential information on tenders or costs for either internal or external
contractors, you must not disclose that information to any unauthorised
individual or organisation. Employees should not recommend suppliers to
members of the public.
Private Interests
You must not let private interest or personal relationships influence your
decisions or actions. You must not use your position to further your own interest
or to inappropriately further the interests of others.
Conflict of Interest
Council employees have an obligation to act in the best interests of the Council
and to avoid situations where there may be a potential conflict of interest. When
competing interests impair our ability to make objective, unbiased decisions, we
have a conflict of interest. You may face a conflict of interest when your
Page 56 of 376

Page 57

Employee Code of Conduct 9 
professional duties as an employee and your personal interests diverge. They may
take the form of financial interests in a supplier’s business, being involved in the
recruitment of a close family member or engaging in employment outside North
Lanarkshire Council. Where you find yourself dealing with a Council contractor or
potential contractor, and you may have some influence or role in respect of the
contract, you should consider whether it would be more appropriate not to deal
with this person or organisation. A potential conflict of interest must be
highlighted to a senior manager at the earliest possible point. If you are unsure
whether a conflict of interest exists, the default position is that you should discuss
it with your line manager or another senior manager. It is a legal requirement that
you must advise the Council immediately if you become aware that a contract in
which you have a financial interest has been or is proposed to be entered into by
the Council.
If you are involved in the operation of other Council HR policies, for example,
Recruitment and Selection, Supporting Attendance, Discipline and Grievance, you
must declare any interest or relationship to your line manager, where a decision
will be made as to whether you can continue to be involved in the process. You
must not do any work, paid or unpaid, for any person, organisation, or club if that
might result in a conflict of interest.
Where an employee identifies a potential conflict of interest, they must discuss
this with their line manager and complete the Employee Declaration for Conflict-
of Interest form. Guidance on what circumstances may be considered a conflict of
interest and the employee declaration form is available on myNL. The form must
be signed by the line manager and then submitted to the relevant Chief Officer.
Disclosure of Legal Proceedings
If your behaviour or conduct outside work has any bearing on your employment,
then this may be considered by the Council in terms of the Discipline Policy.
Employees must disclose to their manager, at the earliest possible stage, any
involvement with the police which results in their arrest, charge, summons,
reprimand, or caution being issued or if they are convicted or if any court orders
or injunctions are issued against them. Minor offences such as fines or speeding
do not need be declared, but driving offences should be declared where it is an
essential requirement of your role to drive. The bearing of the offence on your
employment will be fully and objectively considered and if necessary, an
investigation may be carried out and appropriate action taken.
If you require a Disclosure Scotland/PVG Check to allow you to undertake any part
of your role, the Council reserves the right to require you to undergo a Disclosure
Scotland/PVG Check at any stage of your employment.
Page 57 of 376

Page 58

Employee Code of Conduct 10 
Safeguarding
It is a statutory requirement for the Council and its employees to protect children
and vulnerable adults. If you hear information or directly witness something that
makes you concerned about the treatment or care of a child or vulnerable adult,
you must report this immediately to your line manager or senior manager unless
your service or role provides an existing protocol to be followed in the course of
your duties which should be complied with.
Prevent
Prevent is one part of the government’s overall counter-terrorism strategy and all
employees of the Council must have an awareness of the Prevent duty and
understand the related responsibilities. Accordingly, all employees must
undertake the mandatory e-learning on PREVENT.
If you become aware or concerned about an individual’s behaviour and are
concerned that they are being radicalised or feel that their views are extremist,
please discuss this with your manager who will assist in determining the best
course of action. More information is available on our website:
https://www.northlanarkshire.gov.uk/your-community/emergencies/keeping-
safe
Employees who see or hear something unusual or suspicious that could be
considered as possible terrorist activity, should contact the police in the first
instance.
Political Neutrality
An employee must serve the Council as a whole and all Councillors regardless of
their party or political affiliation. The Chief Executive and Chief Officers have an
additional responsibility to help ensure the implementation of the policies of the
Council. An employee must implement the policies of the Council irrespective of
personal views held on them.
If an employee is asked by a Councillor to provide assistance on a matter which is
clearly party political or which does not have a clear link with the work of the
Council, then the employee should politely refuse and notify their line manager.
If an employee is unclear about the request, they should contact their line
manager before taking any action or providing any form of response.
Politically Restricted Posts
In terms of the Local Government and Housing Act 1989, a person who holds a
“politically restricted post” is disqualified from being or becoming a member of a
local authority, member of House of Commons or member of the European
Parliament and Scottish Parliament. Additional restrictions include acting as an
election agent or sub-agent for a candidate for election and holding Office in any
political party, or being a committee member, if this would involve representing
Page 58 of 376

Page 59

Employee Code of Conduct 11 
the party or local branch or engaging in its general management. If you hold a
politically restricted post, full details of the restrictions can be found in your
Contract of Employment and further details can be obtained on myNL.
Privacy and Confidentiality
As a public authority the Council seeks to be open, honest, and transparent in
what we do. In addition, individuals have legal rights under Freedom of
Information or Data Protection legislation to access a wide variety of information
held by the Council. It is important that we aim to be of assistance to people who
choose to exercise those rights while at the same time seeking to safeguard the
legitimate interests of the Council as an organisation and its employees.
Against that background care should be taken to ensure that information on
Council business, particularly where it may concern options or proposals which
are not yet commitments, is restricted to those who have legitimate interests to
be aware of it. Accordingly, care should be taken to preserve the privacy of
individual items of information which inevitably we will come across as Council
employees and to exercise caution about divulging the business of our employer
more generally.
Employees will be responsible for the security of all Council information in their
possession at home and in the workplace and should ensure this is stored
securely to prevent any breach of Data Protection. Paper records at home should
be avoided where possible. If paper records are required, employees are
responsible for ensuring these are disposed of using confidential waste facilities
within Council buildings.
Employees should be mindful of their environment when having confidential
discussions. When working from home employees should ensure their
environment allows for this and that they have appropriate equipment such as
headsets to minimise the risk of being overheard.
Employees should ensure a professional working environment during meetings
whilst at home, ensuring confidentiality and that noise levels and interruptions
are minimal. Any concerns should be discussed directly with your line manager in
the first instance.
Employees should always conduct themselves in a professional manner during
virtual/video meetings and be mindful that the standard that would be expected
in an office environment e.g. business casual dress, confidentiality, is also
expected whilst working from home. Employees should have their camera on
when on a video meeting/call and should ensure they have a professional non-
offensive background when participating in such meetings.
Page 59 of 376

Page 60

Employee Code of Conduct 12 
Financial Responsibilities
Employees have a duty to use public funds in a responsible and lawful manner
and in undertaking their duties, they should strive for value for money for the local
community and should try to avoid legal challenge to the Council.
The Council’s Financial Regulations safeguard the Council’s assets and use of
resources, and you must ensure that you are familiar with these regulations and
comply with them, if your responsibilities include the use of financial resources.
Procurement
The tendering process must be a fair and transparent procurement process as
detailed within the Financial Regulations. Employees involved in this process
should be clear in their role and those employees who have both a client and
contractor responsibility must demonstrate openness in their work and be
accountable under each responsibility.
Procurement Regulations must always be followed, and no contract should be
awarded out with. If an employee has any concerns over the lawfulness of certain
actions, they should raise this with their line manager or through the Council’s
Whistleblowing Policy.
When awarding contracts, employees must not be involved with external
contractors or potential contractors, who employ, in a senior or relevant
managerial capacity, their partners, close relatives or associates.
Property
Employees must not steal, wilfully damage, or take off site (including recycling
centres) without permission anything that belongs to North Lanarkshire Council.
Removal of items without authorisation will be classed as theft and addressed
accordingly. Any property belonging to the Council, including laptops, must be
returned immediately upon termination of employment.
Debt/Fraud
The Council has a statutory duty to comply with the National Fraud Initiative and
ensure public funds are managed properly. Accordingly, the Council will use
information held on employees to ensure that all sums due to the Council are paid
timeously (e.g. non-payers of Council Tax will be identified as part of this process).
The information may also be used to prevent and detect fraud, and it is possible
that it may be shared with other local authorities or public bodies that handle
public funds.
Any employee who is the perpetrator of benefits fraud within the Council or any
other public agency, will be subject to disciplinary action.
Employees can be offered support and advice if they are experiencing financial
difficulties, through their line manager in the first instance and thereafter, where
necessary further appropriate support will be sourced.
Page 60 of 376

Page 61

Employee Code of Conduct 13 
Gifts and Hospitality
Excellent standards of conduct are expected from everyone, and this includes
being open and transparent about gifts and hospitality provided or received. Gifts
include any item of value provided to a third party or received from a third party
by the Council or our employees. Hospitality includes any business entertaining,
such as travel, accommodation, meals, and invitations to events given to the
Council and its employees by third parties or given by the Council to third parties.
The Council discourages employees from accepting or giving gifts or hospitality.
The Council has in place an Offer of Gifts & Hospitality procedure which requires
you to advise the relevant Chief Officer of any gift or hospitality received by or
offered to you in the course of your employment with the Council. It is important
that such procedures are strictly complied with at all times as failure to do so may
be regarded as a disciplinary offence, in the interests of ensuring compliance with
high standards of conduct and personal integrity within the Council. Employees
shall not, because of their employment with the Council, accept any fee or
financial reward whatsoever other than their salary.
Gifts
As a rule, gifts to staff should not be accepted, as the practice of accepting gifts
can lead to accusations of bias or privilege towards those giving gifts. However,
there may be occasions where gifts, can be offered and accepted where there can
be little or no suspicion of bias or partiality. For example, where gifts are of token
value, these can be accepted.
Examples would small gifts below £50 and would include pens, diaries, calendars
and so on. In such a situation the gift can be accepted and does not require to be
registered. If a gift is offered (not of token value (between £50 and £200) it can
only be accepted if authorised by a Chief Officer or nominated officer, and the gift
must be registered (even if not ultimately accepted). Authorisation will be granted
where the Chief Officer is satisfied that the gift does not give rise to any issues of
preference or partiality and that there are circumstances justifying acceptance of
the gift. Gifts exceeding £200 if authorised to be accepted by a Chief Officer or
nominated officer must be disposed of in the following ways:
1. Displayed in the building.
2. Raffled off to allow all employees a chance to benefit.
3. Donated to a charity.
4. If edible, placed in a break room for everyone to share.
5. Otherwise disposed of in a manner determined by a Chief Officer or
nominated officer.
Hospitality
You should only accept offers of hospitality if there is a genuine need that you
represent the local authority in the community. You are required to ensure that
the hospitality is reasonable, proportionate, and not lavish. You should only
Page 61 of 376

Page 62

Employee Code of Conduct 14 
accept offers to attend purely social or sporting functions when these are part
of the life of the community or where the Council should be seen to be
represented. All offers of hospitality should be registered, whether accepted or
not. If an employee is found to have accepted the offer of hospitality and it is not
justified or credible, the matter will be addressed under the Council’s disciplinary
process.
Personal Presentation
Employees must ensure that their personal appearance is appropriate to the
nature of the work undertaken, follows operational requirements and portrays a
professional approach which the public will have confidence in. Our goal is to
provide a workplace environment that is comfortable and inclusive for all
employees, however all clothes must be work appropriate, project
professionalism and a business-like appearance. Employees must avoid clothes
with logos that can be offensive or inappropriate or that are overly revealing.
For employees who do not require to wear a uniform or Personal Protective
Equipment, we support a business casual approach which whilst flexible, is aimed
at ensuring we maintain a consistently high standard of appearance. Whilst we
trust that you will apply common sense and will exhibit a professional
appearance, it is important to note that unacceptable attire includes but is not
limited to jogging bottoms, shorts, workout attire, beach attire, tank tops, sheer
clothing that is overly revealing, running trainers, beach flip flops, or slippers. Skip
hats and other outdoor clothing items should not be worn in the office or at home
when working unless it is a safety requirement or there are specific reasons for
doing so that have been discussed and agreed with your manager. We also accept
that as fashion changes, what is deemed appropriate to wear at work will also
change, and whilst we are happy for individuals to follow fashion trends, you must
always look professional and consider if your workwear is appropriate for your
role and the customers you serve.
The Council also reserves the right to insist that employees do not wear items of
clothing or accessories, which it believes, may cause offence to clients, customers,
or other employees.
This also applies to employees working from home. Homeworking may involve
video conference calls and employees should be mindful that a business casual
approach would be expected as your camera must always be on during calls. If
you are unsure of what this means within your working environment, then this
should be discussed with your line manager in the first instance.
Employees who are required to wear a uniform must ensure that they do so
during working hours, unless advised otherwise by their manager. Uniforms must
be clean and worn in presentable fashion. Uniforms must not be altered in
anyway without the Council’s permission and remain the property of the Council.
Employees must ensure good care is taken of them, and return any uniforms
issued on the termination of employment. If you are in a role that requires
Page 62 of 376

Page 63

Employee Code of Conduct 15 
protective clothing, you are required to wear this clothing while performing your
duties whenever required by law or by Council rules. Uniforms should only be
worn during the working day and should not be worn when carrying out any
personal business that may be misconstrued as you still being on duty.
The above principles apply at all times. Throughout the year, the Council may
choose to take part in organised fund-raising days where the dress code will be
relaxed. If fund-raising days are to be held, details will be circulated to employees
in advance.
Identification
To prevent security breaches, all employees of the Council must have an up-to-
date ID badge that clearly details their name, job title and the service in which they
are employed. ID Badges must always be worn during the working day and should
be visible to customers, clients, and colleagues. The Council reserves the right to
refuse employees access to buildings who cannot provide a suitable ID badge, and
you must not allow anyone else to use your ID at any time or for any reason. Any
non-compliance or misuse of ID badges could result in disciplinary action.
Alcohol and Drugs
The Council requires all employees to report for duty free from the effects of
alcohol and drugs. It is not acceptable to be under the influence of alcohol or
drugs at work or consume alcohol or drugs during hours of work – this includes
paid and unpaid breaks.
Employees working from home will also be expected to adhere to these
requirements during their working hours. Any concerns that a manager has that
an employee is under the influence of alcohol or drugs whilst at work or working
from home will be addressed in accordance with the Alcohol & Drugs Policy.
Employees who feel that they have an issue with alcohol and/or drugs should
speak to their line manager in the first instance to obtain appropriate support.
Anti-Fraud/Whistleblowing
There are procedures in place to deal with the potential for fraud within the
organisation. These are contained within the Counter Fraud Policy and again in
the interests of the Council and everyone who works within it, it is of primary
importance that these procedures are complied with.
To assist in ensuring high standards of conduct within the Council, any employee
who has serious concerns about any aspect of the Council’s work, should report
this.
The Whistleblowing Policy provides a confidential reporting framework through
which employees can express their concerns without fear of victimisation,
subsequent discrimination, or disadvantage. However, this policy should not be
Page 63 of 376

Page 64

Employee Code of Conduct 16 
used for issues that are operational and addressable by the line manager. The
Council’s procedure on Whistleblowing can be accessed here.
Contact with the Media
Employees must not deal directly with the press or the media unless required to
do so in the normal course of their work, or where they have been expressly
authorised to do so by a Chief Officer. All enquiries for information or comment
on issues affecting the operation or work of the Council, must be referred to the
Chief Officer, Strategic Communications and Engagement or their nominated
officer. Any employee who contacts or responds to the media in the course of
their work and without authorisation, may be subject to disciplinary action.
It should be noted that it is legitimate for authorised trade union representatives
to comment to the media on Council matters in their capacity as trade union
representatives.
Use of Social Media
The use of online social networking sites has grown significantly and is now a
significant part of daily life. While these sites can provide a positive way to stay
connected with friends, family, or colleagues, it is important to ensure that the
informal nature of such sites does not give rise to professional or ethical concerns
or breaches of confidentiality by North Lanarkshire Council employees.
Employees should not make comment on social media sites as an individual
regarding the position of the Council, their views of the Council or individuals
employed by the Council, in such a way that they can be identified as an employee
of the Council. Employees should read the Acceptable Use of ICT Policy for further
information and advice. It is also important that employees are aware and protect
against potential problems that can arise from their use of social networking sites
at home, on personal mobile phones or other non-Council ICT equipment.
The following guidelines should apply when using social networking sites
(whether at home or if authorised to do so during working time and/or using
Council owned ICT equipment). Employees have a personal responsibility to
ensure that the principles below are followed when using social media in their
own time and when using their own ICT or Council equipment. Employees must
remember that social networking sites are not secure and can be accessed by the
general public. It is therefore essential that no information is placed on social
networking sites which could:
• Breach confidentiality, trust, or ethics.
• Constitute harassment of an individual or group.
• Constitute potential defamation of character.
• Discredit services provided by North Lanarkshire Council
• Discredit North Lanarkshire Council as an employer.
Page 64 of 376

Page 65

Employee Code of Conduct 17 
North Lanarkshire Council email addresses must not be used on any social
networking site. The Guidance on the use of social media for Work Purposes sets
out clear guidelines for using social media on behalf of the council and how any
security risks or reputational damage can be avoided or mitigated. Misuse of
social media may lead to disciplinary action.
Co-operation with Internal Investigations and
Procedures and with Legal Proceedings
On occasions you may be required to participate in internal investigations arising
under the Council’s Discipline, Grievance and Dignity at Work Policies and may
also be required to attend investigation meetings, hearings and appeals as a
witness. In addition, the Council may also require the attendance of employees as
witnesses or representatives at court or tribunal hearings in which the Council is
involved. These responsibilities, where they arise, should be seen as part of your
normal duties and responsibilities.
Secondary Employment
The Chief Officers’ Code of Conduct requires that Chief Officers must not
undertake any other employment or outside or private work except in certain very
limited circumstances.
For other staff, the Council will normally allow you to undertake other paid work
where there is no conflict of interest, and it is unlikely to have an adverse effect
on the work of the Council. You are not permitted to use the Council’s equipment,
assets, or resources for any other work you do.
All employees who undertake additional work outside the Council’s employment
should notify their manager in writing to ensure compliance with the Working
Time Regulations and to ensure that the work does not interfere or impair their
ability to conduct efficiently their work with the Council. The manager will also
assess whether the other work could compromise their work with the Council or
could cause a conflict of interest. You must not carry out any secondary work, paid
or unpaid during your working time with the council.
Further advice is available from the Employment and Policy Team.
Use of Council Equipment
You must take care of any equipment provided to you for the purpose of
undertaking your role. Items such as laptops, mobile phones and any other
equipment must be safely transported when travelling to and from work and
securely stored when at home or in the office. Deliberate damage to equipment
will be addressed through the Council’s disciplinary process.
You must not make use of any Council material, resource, or service to which you
have access through your position for the furtherance of any external
Page 65 of 376

Page 66

Employee Code of Conduct 18 
employment or personal interests. It is irrelevant whether the work is paid or
unpaid.
The use of Council equipment and resources to undertake other work or personal
interests during or out with the working day is strictly prohibited and will be
addressed through the Council’s disciplinary process.
Review
The Employee Code of Conduct will be updated on an ongoing basis to reflect any
changes in legislation, environment or Council activity and will be formally
reviewed every two years.
Page 66 of 376

Page 67

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    FW/LC Date 26/02/25 
Update to Special Leave Policy – Bereavement Leave 
From  Fiona Whittaker, Chief Officer (People Resources)  
E-mail WhittakerF@northlan.gov.uk Telephone 07973 728628 
Executive Summary
In recent years, the average time between death and a funeral within the UK is two to three
weeks with some taking longer depending on the circumstances. Whilst North Lanarkshire
Council has always provided time off for those who are dealing with the death of a close
relative, the period provided was based on the expectation that the funeral would take place
within 3 to 7 days of the death. Given the noticeable change in the timings of funerals, it
has become necessary to review our current bereavement leave provisions to ensure they
continue to provide employees with the time they need to deal with the funeral and any
other business associated with the death.
 
 
  
It should be noted that paid bereavement leave is not a legal requirement, however most
organisations offer some form of paid leave to support employees during this difficult
time.  North Lanarkshire Council has always allowed paid time off for these purposes and
the current provisions are detailed within the Special Leave Policy and F7 Leave of
Absence for Teachers and Associated Professionals Policy.  The links to the current
policies are provided at the end of this report.  
This report outlines the current leave provisions available to employees who are dealing
with the bereavement of a close relative and provides relevant data obtained from iTrent,
that was considered when determining whether the current provisions were adequate or
further enhancements were required.  
The report concludes with the proposal to increase bereavement leave for all employees
dealing with the death of a close relative to two working weeks with the option of adding a
further two working weeks paid leave if required.  In addition, if an employee is absent from
work due to sickness, as the result of a bereavement of a close relative, the first two weeks
of the absence will not count towards a trigger.  It should be noted that changes to the F7
Leave of Absence for Teachers and Associated Professionals Policy have already been
formally agreed but will not be implemented until 1 April 2025. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Consider the contents of this report.
Item 6
Page 67 of 376

Page 68

1. Background 
1.1 Bereavement Leave is currently available to all employees of the Council and the
provisions available are detailed within the Special Leave Policy and F7 Leave of
Absence for Teacher’s and Associated Professionals Policy. 
1.2  In both policies, a close relationship generally covers the following and includes step
relationships: 
Parent(s) 
Sibling(s) 
Children 
Spouse or Partner 
Spouse or Partners Parent(s) or Child/children 
Grandparent(s) 
Grandchildren 
1.3 Other relatives may be deemed as a close relationship; therefore, this list is not
exhaustive, and each case should be considered on its own merit, but in general terms
most close relationships are covered by the above list. 
1.4 For Single Status employees, bereavement leave for a close relation has for many
years consisted of 1 day to attend the funeral, 2 compassionate days and 2 days to
conduct any business associated with the funeral or death and this continues to be the
case. For those covered by the F7 Leave of Absence for Teachers and Associated
Professionals Policy, an additional 2 day’s compassionate leave is available, allowing
for 7 days absence in total. 
1.5 In recent times, it has not always been possible to arrange for a funeral to take place
within the space of one week, and it is reasonable to assume that an employee would
not feel emotionally able to return to the workplace before the funeral takes place.  In
such situations, a manager has been referred to Section 22 of the Special Leave Policy
(Single Status employees) or Section 19 of the F7 Leave of Absence for Teachers and
Associated Professionals Policy which allows for a further period of 10 working days
(or two of a person’s working weeks) either paid or unpaid to be granted to allow the
person a further period of leave. Whilst both these sections are meant to be used for
leave that is required outwith the scope of the policies, it is a means of authorising
additional bereavement leave for those who require it. 
(2) Agree to the proposed enhancement to bereavement leave for employees as
outlined within this report.
(3) Acknowledge that the increased provisions will take effect from 1 April 2025 to
allow for the changes to be approved through the formal committees.   
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (23) Build a workforce for the future capable of delivering on our
priorities and shared ambition
Programme of Work Resilient People
Page 68 of 376

Page 69

1.6    Furthermore, in recognition that most people are unable to return to work immediately
following the death of a close relation, a review of the Supporting Attendance Policy
(Single Status employees) and Managing Attendance Policy for Teachers and
Associated Professionals resulted in the first two weeks of any sickness absence due
to bereavement of a close relative not counting towards a formal trigger within the
policy.   
1.7 That said, if the absence continues it is important to invoke the appropriate absence
policy to ensure that the employee is receiving the support that they need from their
manager but also to encourage a return to work. 
1.8 In effect, whilst a week is the official paid time off given to employees following the
bereavement of a close relation, we are currently providing additional paid time if
required to a maximum of one week, giving two weeks in total. However not everyone
needs or requires this additional time, but it is important that a manager has the ability
and authority to increase this type of leave if required. 
1.9 Other bereavement leave provisions are available for those who are attending a funeral
of a relative or friend etc and legally parental bereavement leave is available to those
who have lost a child.  However, as this report is concentrating on the provisions
available to those who have lost a close relation, these other provisions will not form
part of the report. 
1.10 Finally, it should be noted that the trade unions have been involved in discussions
around the entitlement to paid time off for bereavement leave and have highlighted that
bereavement leave provisions for close relations should be enhanced. Accordingly, it
should be noted that the trade unions have agreed to the proposals outlined within this
report. 
2. Report 
2.1 There is no legal entitlement to paid time off for bereavement except for eligible parental
bereavement pay when a child dies (2 week’s pay).  However, most organisations
within Scotland, including other local authorities, offer a week’s full pay which can often
be extended to two weeks paid or unpaid depending on the circumstances. 
2.2 As outlined earlier in the report, entitlement to paid time off following the death of a
close relation has been a longstanding arrangement available to all employees of the
Council.  Although the time off is prescribed in detail within the policy, on most
occasions managers will make arrangements with employees to ensure that they have
adequate time off to deal with funeral arrangements and any other pressing issues
following the death. 
2.3 Complications arise when employees require additional time due to the timelapse
between the death and the funeral and this is where in recent times, managers have
been encouraged to use ‘other’ special leave available to all employees of the Council
within the relevant special leave policies, however this is limited to a maximum of 2
weeks paid or unpaid and generally we have not authorised beyond one week. 
2.4 Additionally, in recognition that employees often need time to grieve after the death of
a close relation, the first two weeks of a sickness absence related to the bereavement
of a close relation, does not count towards a formal trigger although sick pay would be
applied at the appropriate rate. 
Page 69 of 376

Page 70

2.5 During the leave year 1 April 2023 to 31 March 2024, there were 3070 occasions of
bereavement leave recorded, totalling 4278 days. This equates to an average of 1.4
days per employee for each occasion of bereavement leave taken under the special
leave policy.   
2.6 In the same absence year noted at 2.5 there were 968 sickness absences recorded as
‘bereavement reaction’ with a total of 10,535 days lost. This gives an average of
approximately 11 days lost per absence.  On reviewing the data, the days lost per
absence ranged from 1 day to 23 days, and although there were some cases where
the absence was beyond this range, it was determined that the average days lost was
around 4 weeks and therefore this would be the optimum period of paid special leave
that our provisions should allow for. 
2.7 On asking other local authorities through a benchmarking exercise about their
bereavement special leave provisions, out of nine who responded, two give more than
5 days paid leave and South Ayrshire advised that they do not specify leave but
reasonable time off with pay is granted on the death of a close relative.  For the two
Councils who gave additional time, this did not extend beyond 10 paid days. 
2.8 In conclusion and taking into consideration the information detailed within this report, it
is proposed to increase paid leave for employees who are dealing with the death of a
close relative to 2 working weeks for all employees.  Managers will also be able to use
the provision detailed under ‘other leave’ within the Special Leave Policy that will allow
them to grant a further 2 working weeks paid if necessary.   
2.9 It is intended that the increased provisions will be implemented with effect from 1 April
2025, however in the meantime, employees will continue to be supported as necessary
when dealing with the death of a close relative. 
2.10 Once the proposed change to the Special Leave Policy has been by approved by
Committee and Council, appropriate communications will be issued to ensure all
managers are aware of the increased provisions.   
3. Measures of success 
3.1  North Lanarkshire Council is viewed as an employer of choice and provides employees
with a good work-life balance that takes cognisance of significant life events such as
bereavement. 
3.2 Employees feel valued knowing that the Council offers employees the support they
need through the provisions outlined within the Councils’ Special Leave Policy and F7
Leave of Absence for Teachers and Associated Professionals Policy. 
3.3 The Council continues to retain and attract staff to the organisation that are vital to its
success. 
4. Supporting documentation 
Appendix 1 – Proposed update to Special Leave Policy
Special Leave Policy can be accessed here
F7 Leave of Absence for Teachers and Associated Professionals can be accessed 
here 
Page 70 of 376

Page 71

Fiona Whittaker
Chief Officer (People Resources) 
5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
As funerals are taking longer than a week to organise, employees are reporting absence
from work due to sickness to cover the timelapse.  To prevent employees having to report
sick, the increased provisions should provide enough time to deal with the funeral and any
associated business whilst preventing unnecessary sickness absence. 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Page 71 of 376

Page 72

5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☒ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☒
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 72 of 376

Page 73

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 73 of 376

Page 74

Appendix One 
Proposed Update to Special Leave Policy 
Section Current Wording Proposed Wording 
5.1  Close Relationships 
• 1 day to attend the funeral 
• 2 compassionate days 
However, the amount of leave granted
will depend on the individual
circumstances of each case, such as
the closeness of the relationship. Close
relationships would generally include: 
Parent(s)
Sibling(s) 
Child/ren Spouse or partner 
Spouse or partner’s parent(s) or
child/ren 
Grandparents or grandchildren 
These relationships would also include
step relationships. 
Additional leave of up to 2 days will be
granted to conduct business in
connection with the funeral if
undertaking this responsibility. This
leave will normally only be granted to
employees who are the designated next
of kin of the deceased person. 
Bereavement leave for part time/job
share/flexible working employees will be
authorised as the equivalent of up to
one of their normal working weeks. In all
circumstances, paid leave will be up to a
maximum of contracted daily hours.
Close Relationships 
• 2 working weeks 
However, the amount of leave granted will
depend on the individual circumstances of
each case, such as the closeness of the
relationship. Close relationships would
generally include: 
Parent(s)
Sibling(s) 
Child/ren Spouse or partner 
Spouse or partner’s parent(s) or child/ren 
Grandparents or grandchildren 
These relationships would also include step
relationships. 
Where there is a delay in the funeral taking
place or there are complications around the
death and business associated with this, an
additional 2 weeks paid leave can be
considered by using Section 22 of this policy.
It should be noted that this extended leave
will normally only be granted to employees
who are the designated next of kin of the
deceased person. 
Bereavement leave for part time/job
share/flexible working employees will be
authorised as the equivalent of up to two
weeks of their normal working weeks. In all
circumstances, paid leave will be up to a
maximum of contracted daily hours. 
22.  There may be occasions when special
leave is appropriate but may not be
covered by the Special Leave
provisions. In these exceptional
circumstances, the relevant Chief
Officer has the discretion to authorise
special leave, either paid or unpaid, up
to a maximum of 10 working days in
total (or up to the equivalent of two of
the employee’s normal working weeks),
for situations not already covered by this
policy. 
Applications for special leave which
exceed 10 working days, either paid or
There may be occasions when special leave
is appropriate but may not be covered by the
Special Leave provisions. In these
exceptional circumstances, the relevant
Chief Officer has the discretion to authorise
special leave, either paid or unpaid, up to a
maximum of 10 working days in total (or up
to the equivalent of two of the employee’s
normal working weeks), for situations not
already covered by this policy. 
Applications for special leave which exceed
10 working days, either paid or unpaid, and
Page 74 of 376

Page 75

unpaid, and which are not covered in
the above provisions, must be
authorised by the Chief Officer. It is
requested that, prior to the approval of a
request for more than 10 days leave,
that the merits of the request be
discussed with the Chief Officer People
Resources to ensure that no
unintentional precedent is established.
which are not covered in the above
provisions, must be authorised by the Chief
Officer. It is requested that, prior to the
approval of a request for more than 10 days
leave, that the merits of the request be
discussed with the Chief Officer People
Resources to ensure that no unintentional
precedent is established. 
The exception to the above is where there is
a requirement to extend the period of paid
leave available to those who are dealing with
the death of a close relative.  A manager,
following discussion with the employee, can
extend bereavement leave for a maximum of
two working weeks paid using this section of
the policy. However, this leave would
normally only be granted to the next of kin
and should be granted based on the
circumstances of the case.   
Page 75 of 376

Page 76

Page 76 of 376

Page 77

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    KH/GR/TD01 Date 26/02/25 
Connectivity Programme – Wide Area Network Project 
Completion 
From  Katrina Hassell, Chief Officer (Business and Digital)  
E-mail HassellK@northlan.gov.uk Telephone 07903 096121 
Executive Summary
The Connectivity Programme was created to improve connectivity across the Council
estate and in so doing provide benefit to residents and businesses by influencing the
connectivity market through introducing fibre-based service across the region. Latest
statistics illustrate the Council’s programme has been successful, with fibre now available
to 49.5% of premises, (up from <3% in 2021). 
An important aspect of the programme was the modernising of the Council’s Wide Area
Network (WAN), associated edge security and Internet access. The report summarises the
delivery of this aspect of the programme, highlights the improvements in place and
considers future use and enhancements.
Recommendations
It is recommended that the Finance and Resource Committee: 
(1) Acknowledge the content of this report providing detail on the successful completion
of the Connectivity Programme Wide Area Network project.  
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (18) Ensure our digital transformation is responsive to all people's
needs and enable access to the services they need
Programme of Work Digital North Lanarkshire
Item 7
Page 77 of 376

Page 78

1. Background 
1.1 Following extensive market research, a PIN notice and a negotiated tender process,
the Council awarded a Framework Agreement to Commsworld Ltd, for an initial period
of 180 months (15 years), further reserving the right to extend the Agreement for
additional periods up to a maximum of a further 60 months (5 years). The value of the
Framework Agreement shall not exceed One Hundred and Fifty Million Pounds Sterling
(£150,000,000) exclusive of VAT. 
1.2 Between February 2022 and time of report, contracts to the value of c£25M have been
awarded via the Framework to cover delivery of an all-new, infinitely scalable, ultra-fast
fibre backbone network; improved internet capacity across the schools and corporate
networks; provision of perimeter firewall capability; a new schools web filtering solution;
and a public wi-fi service covering schools, libraries, leisure centres, town centres and
public facing corporate buildings. 
1.3 Prior to the work of the connectivity programme, the previous wide area network,
provided by Virgin Media, relied upon core nodes located in Council buildings linked
via high bandwidth fibre rings. Local sites then connected to these core nodes through
a local ‘star and ring’ topology. Individual site bandwidth varied from a low 10Mb up to
1Gb. 
1.4 The Wide Area Network is used to move data traffic between sites but also to and from
Internet based services. Previously this relied upon several individual Internet
connections with specific data traffic directed to specific connections. Overall Internet
connectivity was a combined 15Gb.   
1.5 All internet traffic must pass through security appliances such as Firewalls, with internet
browsing also needing to pass through web-filtering technology. Although these tools
are critical for securing the Councils network, they can also ‘choke’ its performance
and/or become single points of failure. Our new solution was therefore designed to
mitigate these known issues.     
1.6 The Council has previously operated a separate CCTV network. An ambition of this
project was to consolidate these networks where such was appropriate. 
1.7 The Commsworld solution – a new, infinitely scalable, ultra-fast fibre backbone network
in excess of 320km across North Lanarkshire – delivers all required Services to the
Council and also enables future services by building a digital infrastructure that will
provide benefit to the community i.e. Full Fibre to the Home (FTTH), high-capacity
services to the business community and the lifeline for future technologies such as 5G. 
1.8 The design replaces the previous reliance upon council sites as aggregator nodes with
each site now instead connected on fibre to Commsworld’s MPLS (Multi-protocol Label
Switching) core network. 
2. Report 
2.1 The previous network supplier, Virgin Media, network design relied upon a ring of 12
node sites providing a network backbone to all council sites. All data and traffic were
routed via this 10Gb ring back to the NLC data centres in Motherwell Civic Centre and
Data Vita (Chapelhall). The nature of this design created issues for the Council as it
looked to rationalise and refresh its building infrastructure. Similar impacts were also
felt during local power outages. 
Page 78 of 376

Page 79

2.2 The connectivity programme has enabled the Council to implement an infinitely
scalable, ultra-fast fibre backbone network based on MPLS technology that removes
the reliance on core nodes, allowing data and traffic to go direct to the internet where
required. 
2.3 The programme included the upgrade of bandwidth at all sites with a base provision of
1GB per site whist high schools and key corporate sites were provisioned with 5GB
resilient connections with the ability to increase to 10Gb if required. 
2.4 Internet bandwidth has been increased significantly for all schools with 60Gb of internet
capacity provided as part of a cloud provision and a further 2 central 10Gb resilient
internet connections available as a backup via the Motherwell and Data Vita data
centres. 
2.5 Cloud based perimeter firewalls were introduced to replace the existing on prem end
of life hardware. The solution incorporates DDOS (Direct Denial of Service) mitigation,
a common cyber-attack that threat actors use to overload an organisation’s service to
take them offline. It does this through identifying an attack is underway and diverts the
traffic away from the target into an internet ‘dead end’. 
2.6 The new firewalls also included a school’s web filtering solution to help improve the
security for staff and pupils accessing the internet from North Lanarkshire schools. 
2.7 The introduction of the new Commsworld network has allowed the integration of the
CCTV network with the corporate network meaning both now run on the same
infrastructure, though logically separated into their own domains. This offers the
potential opportunity to provide a CCTV service to more council locations without the
need to add additional network infrastructure. To date over 70 cameras have been
delivered via the combined aspect of the network. 
WAN Delivery 
2.8 Starting in March 2022, the connectivity programme delivered 320km of fibre into the
ground across North Lanarkshire connecting 314 council sites with 342 network
circuits.  13 CCTV sites were connected to the same network. This work was originally
planned to be completed by July 2023, however due to experiencing a significantly
greater volume of duct blockages than expected within existing Open Reach
infrastructure the delivery date was extended to June 2024, although this mainly
consisted of small number of services with specific challenges. 
2.9 Support work completed to deliver the new network included site surveys, asbestos
checks, cabinet and power installations, cabling installations and infrastructure
hardware upgrades across the council estate. 
2.10 The timeline for programme completion was impacted by the reliance on multiple third
parties to complete various aspects of the support work, the process around asbestos
checking in particular can introduce significant delay. This complexity has been noted
in lessons learned to ensure the support required for any future developments of this
nature are better understood. 
Future Use 
2.11 The Commsworld contract is a 15-year partnership aimed at the initial upgrade of the
corporate network as detailed above. It does however also provide significant
Page 79 of 376

Page 80

opportunity to bring new IoT technologies online without concern on the network impact
and security. 
2.12 The new design offers the opportunity to manage specialist technologies more securely
ensuring they don’t impact the core network. 
2.13 The ultra-fast fibre backbone is scalable meaning that bandwidth can be increased
more easily to support future demands on the network. This is particularly true as more
line of business systems move to the cloud as SaaS (Software as a Service) services. 
Contract Cost Details 
2.14 The new contract and network, internet, firewall and web filtering provision has resulted
in a revenue cost reduction of approx. one third of the annual network costs (£1,2M),
with such used to deliver approved budget savings for the Business and Digital service. 
Performance 
2.15 The increase in site bandwidth and internet access is considerable; monitoring of the
network identifies that typical combined usage during peak working day is <8GB:
Typical non-secondary  AVG: 50MB PK 200MB
Typical secondary  AVG: 70MB PK 670MB 
2.16 Internet traffic typically runs at < 10% of capacity. 
2.17 Stability of the platform has been a key benefit with no major outages experienced to
date; local outages where they have arisen can predominately be attributed to local
power issues or external damage to cabling through infrastructure works. 
3. Measures of success 
3.1 Improved connectivity at all sites resulting in a reduction of service calls regarding
system access and performance.  
3.2 A reduction in digital exclusion due to the introduction of a public Wi-Fi service available
across North Lanarkshire.   
3.3 The ability to provide a secure internet connection for IoT devices using existing
infrastructure. 
3.4 Cost savings against previous supplier contracts. 
4. Supporting documentation 
None. 
Katrina Hassell
Chief Officer (Business and Digital) 
Page 80 of 376

Page 81

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
Paragraph 2.14 above highlights the financial savings realised through the delivery of this
contract. 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 81 of 376

Page 82

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Several technical details are peppered throughout the report. These confirm that the
Council’s new connectivity solution was designed to successfully mitigate known
performance and single point of failure issues.   
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from the
United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out? 
Yes ☐ No ☐ 
Page 82 of 376

Page 83

North Lanarkshire Council  
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    IM/JR Date 26/02/25 
Land Reallocation – Former Columba High, School Street,
Coatbridge ML5 4DA 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail MartinI@northlan.gov.uk Telephone Ian Martin
07966 397637 
Executive Summary 
The purpose of this report is to seek committee approval for the transfer of land held by
General Services for inclusion in the new build programme. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Approves the land transfer of the former Columba High School site from General
Services to Planning and Regeneration on the terms detailed in Section 2.4 of this
report. 
(2) All other terms and conditions to be adjusted by the Chief Officer (Assets and
Procurement).  
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (1) Ensure a housing mix that supports social inclusion and
economic growth
Programme of Work Transforming Places
Item 8
Page 83 of 376

Page 84

1. Background 
1.1 Columba High School was declared surplus at the Education and Families committee in
2005 and demolition of the school was completed in July 2007. 
2. Report 
Description 
2.1 The development site comprises the former Columba High School which was 
demolished in 2007. The 9.8 acre or thereby site, is located within a residential area in 
a central location in Coatbridge, close to transport links, schools and retail and 
commercial uses. 
2.2 The proposal is to develop 127 NLC social housing units as part of the council’s overall 
transformation strategy. The proposed development would consist of a mix of houses 
and flats. 
2.3 Planning permission for the site was approved in November 2023, with development 
programmed to start in early 2025. 
Re-allocation 
2.4 The contractor has carried out site investigation works and submitted an assessment of 
abnormal development costs. The costs relate to specialist foundations, grouting works, 
gas membrane, retaining walls and service diversions. The New Supply team have 
reviewed the costs and have confirmed that they are reasonable given the extent of the 
works required. The amount of abnormal development costs has been assessed at 
£1,769,989.43. 
2.5 The headline value of the land is £3,000,000 and therefore to competently complete this 
transfer, a capital sum of £1,230,010.57 is to be paid from the Housing Revenue Account 
to the General Services Account. The transfer sum reflects the abnormal development 
costs required in developing this site. 
3. Measures of success 
3.1 The residential development will regenerate a brownfield site and help the council meet
its new supply targets contributing to meeting local housing need, while creating new
residential units for social rent. 
4. Supporting documentation 
Appendix 1 – Location Plan 
James McKinstry
Chief Officer (Assets and Procurement) 
Page 84 of 376

Page 85

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The transfer of land will enable the provision of high-quality housing for rent which
will help address housing need.   
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Provision has been made within the council’s Housing Revenue Account to fund
the purchase of the land.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 85 of 376

Page 86

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The new homes will be more energy efficient contributing to the reduction in CO²
emissions.
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 86 of 376

Page 87

Appendix – 1 Location Plan 
Page 87 of 376

Page 88

Page 88 of 376

Page 89

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    3081 Date 26/02/25 
Land Surplus to Operational Requirements at Ailsa Road,
Coatbridge 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail SullivanC@northlan.gov.uk Telephone Chris Sullivan
07939 280579 
Executive Summary
The purpose of this report is to seek council consent to declare an area of land extending
to 37 square metres or thereby surplus to council requirements. The area of land is located
at Ailsa Road, Coatbridge and is shown on Cartographic Drawing 48215 at Appendix 1 to
this report. Scottish Power Energy Networks have enquired about the possibility of the land
being declared surplus to council requirements with a view to leasing the land to them for
a new electricity substation. The requirement for a new substation is to ensure the
continuity of a reliable electricity supply in this locality in future. 
In keeping with council procedure, as there has been an objection from a local councillor
to the proposed future use of this land, this paper is presented to committee for
determination. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Consider the contents of this report and the local member’s objections, 
(2) Agree the proposal to declare the land surplus to council requirements. Thereafter
the council’s Estates Team can consider future use in keeping with council policy.   
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement (3) Maximise the use of our marketable land and assets through
improved development in business and industrial infrastructure
Programme of Work Statutory / corporate / service requirement
Item 9
Page 89 of 376

Page 90

1. Background 
1.1 Scottish Power Energy Networks (SPEN) have indicated that they wish to explore the
possibility of the council owned land (37 square metres or thereby) shown on
Cartographic Drawing 48215 at Appendix 1 to this report being leased to them for the
purpose of installing a new electricity substation. 
1.2 They have advised that due to the electrical network in the Ailsa Road area being at
the end of a long section, it will suffer most from volt drop in future if there is no action
taken. The connection of a new substation will also allow for increased capacity for
local residents to connect new green technologies in future such as electric car
charging and heat pumps. In addition, a new substation will provide additional network
security to the area.   
2. Report 
2.1 The land consists of a section of maintained amenity grass within a larger area of
maintained amenity grass and is situated within an established area of primarily
privately owned housing in Coatbridge. 
2.2 In keeping with the council’s surplus property procedure for areas of ground that
amount to fewer than 50 square metres, the council Holding Service (Housing) have
been consulted on the proposal to declare the land surplus to requirements. There have
been no objections in principle to the land being declared surplus to their requirements
as the land is not considered to be of current or future operational use to Housing. 
2.3 Owing to the proposed size of the substation being under 29 cubic metres planning
permission would not be required as the installation would come under permitted
development rights. SPEN have advised that they would seek to engage with the local
community throughout the course of the project. As part of the works they would
undertake a letter drop in the local area to notify affected customers and explain the
purpose of the works to them. Doorstep conversations will take place with customers
whose properties will be directly affected by any digging works. Any publicity material
used will have a contact from SPEN listed on them, who will be available for customers
to contact during working hours. A modern glass reinforced plastic enclosure will be
used to ensure that there is minimal visual impact to the area. 
2.4 Local councillors within the applicable ward have been consulted on the proposal to
declare the land surplus to requirements. A meeting was convened between the
Council, SPEN and two local members to discuss some concerns. However, the
objection from one local member to the proposed substations remains. It should be
noted that declaring land/property surplus and the potential future use are two distinct
matters. In the ordinary course of things, local councillors are consulted with a view to
discovering any objections in principle to council land or property being declared
surplus. In the case of Ailsa Road, the proposal to declare the land surplus has been
entirely prompted by the interest of Scottish Power in siting a new electricity substation
there to ensure continuity of supply in the immediate area. It is therefore difficult to
separate the surplus declaration from the proposed future use.  The points of objection
are outlined below with responses provided by SPEN undernoted. 
1. This piece of land is very close to an end of terrace house and the driveway used
for access round the back of the property. It would make very little sense to place
Page 90 of 376

Page 91

anything so close to such a property - especially considering the noise and safety
aspect. 
Response: The boundary of the substation will sit 3-4 metres to the east of the
driveway and will therefore not cause disruption to their access. All of the
transformers that SPEN install fall well within the industry standard for noise regulation
and are quieter compared to older transformers on the network. 
2. Concern about fires 
Response: A standard package substation contains an oil filled transformer, which is
protected from fault energy by fuses and circuit breakers. In the event of a fault, the
protective equipment on SPEN networks operates to de-energise equipment before
disruptive failure occurs. The substation proposed for this site is the same as every
other substation up and down the country, in every housing scheme in Britain, and this
site is considered no more high risk of fire than any others. SPEN can look at installing
a midel filled transformer. Midel is an alternative insulating liquid used in transformers
instead of oil in high- risk locations such as substations enclosed within buildings or
within basements.
SPEN substations are housed within a glass reinforced plastic housing. To prevent
against vandalism, SPEN substation enclosures have a fireproof rating compliant with
BS 467-7. According to SPEN Specification for Prefabricated Glass Reinforced Plastic
Enclosures: “The Enclosure shall be treated to reduce flammability. Sources of ignition
include internal equipment failure, careless handling of propane gas torches and
deliberate acts of vandalism. The resin shall comply with BS 476-7 Class 2 for external
and internal fire rating, regarding surface spread of flame.”
To prevent unauthorised access to equipment, the enclosure doors are fitted with
padlocks that can only be opened by staff authorised by Scottish Power. If it is deemed
necessary SPEN can install a fence around the substation to increase security. 
3. Concern about access for work to maintain the substation. 
Response: Equipment installed in a modern substation is considered to be
maintenance free. Access to this substation would generally only be required to carry
out restoration of power in the event of a power cut, or to carry out switching operations
to reconfigure the network for routine work. Switching operations only require one
person to gain access for 10-15 minutes at a time. As this is a brand new substation, it
will be fitted with tele-control facilities which will allow SPEN’s control room to carry out
switching operations remotely, thereby reducing the frequency for staff to gain access.
The SPEN maintenance department carries out annual  inspections of all substations
to ensure that they remain safe, tidy and to catch any potential problems before they
arise. Any issues flagged up during an inspection are dealt with as soon as possible. 
4. Concern about local children playing near the substation. 
Response: The substation would sit within a glass reinforced plastic enclosure, which
is securely locked and can only be accessed by trained SPEN operatives. Further to
this, within the enclosure there is no exposed live electrical equipment. All electrical
equipment inside the enclosure is locked inside cabinets, which can only be opened by
authorised SPEN staff. Because of this, the danger to children playing near the
substation is considered to be minimal. 
Page 91 of 376

Page 92

5. I also believe this is something the local community would wholly object to. 
Response: As part of any future works, SPEN  will carry out a letter drop to inform
residents of the benefits of the new substation and to inform them of work before this
takes place.
6. The land would also require preparation due to the hill on the middle of it and I fear
this would cause further disruption in the locale where traffic is already at high
volume. 
Response: This piece of land does not require any extra preparation compared to
standard ground works for a package substation. Local residents will be informed of
works before they take place and doorstep conversations will take place to ensure work
will have minimal disruption for residents in the area. 
7. I do not believe this piece of land to be appropriate to build on for any purpose. 
Response: This piece of land is considered the most appropriate location for SPEN to
install the new substation. The area around Ailsa Road has been identified as an area
of high predicted load growth and this patch of land provides SPEN with a central
location to distribute the required power to the area. The new substation is required to
keep up with the predicted load growth and will benefit the residents of the area by
providing a greater security of supply, greater capacity to keep up with the increasing
uptake in low carbon technologies and ensure that electrical supplies remain within
their statutory limits in future. 
2.5 The land at this location has been identified by SPEN as the best location to ensure 
security of the supply in this area and provide for anticipated future needs. The 
Council owns limited amounts of land with the immediate locality and therefore this 
site is considered the most suitable to meet SPEN’s requirements. 
3. Measures of success 
3.1  If the land is declared surplus to council requirements, then future development of the
ground for the proposed substation will help ensure resilience and continuity of supply
within the local electricity network. The Council will also obtain a capital receipt for the
lease of the ground.     
4. Supporting documentation 
Appendix 1 – Cartographic Drawing 48215 
James McKinstry
Chief Officer (Assets and Procurement) 
Page 92 of 376

Page 93

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 93 of 376

Page 94

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 94 of 376

Page 95

Appendix 1 – Cartographic Drawing 48215 
Page 95 of 376

Page 96

Page 96 of 376

Page 97

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    3087 Date 26/02/25 
Property Surplus to Operational Requirements – Rockburn
Pavilion and Pitch, Carnoustie Place, Bellshill 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail SullivanC@northlan.gov.uk Telephone Chris Sullivan
07939 280579 
Executive Summary
The purpose of this report is to seek council consent to declare a pavilion, sports pitch
and ancillary ground occupying an area of 5.47 acres or thereby surplus to council
requirements. The site is located at Carnoustie Place, Bellshill and is shown on
Cartographic Drawing 48372 at Appendix 1 to this report. The current occupiers of the
pavilion and the north-most pitch have enquired about the possibility of the land being
declared surplus with a view to leasing the property, pitch and adjacent land from the
council on a more long-term basis.   
Recommendations
It is recommended that the Finance and Resources Committee: 
(1)    Consider the contents of this report and, 
(2) Declare the property and land surplus to council requirements. If they are declared
surplus thereafter the council’s Estates Team can consider future use in keeping with
council policy. 
The Plan for North Lanarkshire
Priority  Enhance participation, capacity, and empowerment across our
communities
Ambition statement (22) Facilitate a North Lanarkshire wide approach to asset
rationalisation, including with communities and partners
Programme of Work Statutory / corporate / service requirement
Item 10
Page 97 of 376

Page 98

1. Background 
1.1 Bellshill Athletic Football Club currently occupy the pavilion and use the pitch at
Carnoustie Place, Bellshill. They have used the facility for a number of years and in
January 2023 obtained retrospective planning consent for construction of a clubhouse
within the curtilage of the site. The occupation of the ground by the football club has
previously been through an ongoing short-term let arrangement.     
1.2 The club are keen to further develop the site at Rockburn and would like to explore
the opportunity to seek funding applications from external sources to assist with this. 
Funders will generally seek an assurance of a long-term occupation for any site that
they choose to invest in.  For this reason, the club initially approached the council to
ask about purchasing the site.  While this proposal was fully considered, it was
ultimately decided that selling the site was not in the best interests of the council.  As
a result, the club requested that a long-term lease be considered.   
2. Report 
2.1 The pavilion, sports pitch and ancillary ground occupy an area of 5.47 acres or
thereby. The site is located at Carnoustie Place, Bellshill and is shown on
Cartographic Drawing 48372 at Appendix 1 to this report. The land is situated
between a residential housing area to the east and industrial warehousing to the
west. 
2.2 The land and property are not considered to be of current or anticipated future
operational use to Active & Creative Communities, the council holding service for the
land. 
2.3 In keeping with the council’s surplus property procedure, relevant council services
have been consulted on the proposal to declare the land surplus to requirements and
no service has indicated a fundamental objection in principle to the land being
declared surplus. 
2.4 Local councillors within the applicable ward have also been consulted on the proposal
to declare the land and property surplus to requirements. One councillor has objected
and two councillors have some concerns in relation to vehicle parking on match days
and community engagement. The objection from the local councillor to the proposal to
declare the land surplus to council requirements has led to this report being prepared
for the Finance and Resources Committee to determine the status of the property.
The relevant points of objection from the local councillor are outlined below. The
objections from the councillor relate to the overall impact on the local community and
are summarised as follows: 
1. Loss of play facilities - Where are the children on that side of the North Road to
play? Several years ago, the swings etc were removed throughout the park and at
the bottom entrance the land sold to the industrial estate. The only play areas are
on the opposite side of the busy road – one at the shops in Kelvin Road, a
considerable distance for young children; the other at Nairn Avenue, again
necessitating crossing the busy road.  Equally, neither of these areas is suitable
for playing ball games. I thought we were aiming for young people to do more
exercise etc.
Page 98 of 376

Page 99

Response: The play area between Noble Primary School and St Gerard’s Primary
School has good play provision with swings and a variety of play facilities. It also
incorporates a large, fenced multi-use games area (MUGA) that caters for a variety of
ball games. 
2. Loss of amenity space - this is a well-used area for walking and dog walking. 
Local residents already believe the presence of the current tenant to be
detrimental to the amenities in the area as they are often prevented from walking
in the park.
Response: At present, council services are unaware of any significant issue with
access for dog walkers within the locality. Understandably, there may be less access
available during the around match times but within the overall context of time
available during the week this is not considered to be significant.   
3. Parking – a general concern around impact on local residents from current/future
use of Rockburn Park.  Both the Oval and Rockburn Crescent experience
unacceptable parking issues, especially the latter as a fire engine or ambulance
could not pass in an emergency; currently visitors to Rockburn Park are parked
on pavements and block residents’ cars in drives and garages.  Any future use of
the area should consider the impact on lack of parking and subsequent difficulties
caused for residents.
Response: Through discussion with the club, they have made approaches to
residents to make them aware of upcoming matches.  Prior to all home matches, the
club also issue through social media channels to visitors to be mindful of parking and
ensure safe access and egress of the area.  Visitors are recommended to park away
from the adjacent streets. 
2.5  At this time, the site at Rockburn is used only by the current occupier – Bellshill
Athletic Football Club.  A long-term lease may open up the possibility for the club to
attract additional investment into the site, potentially making improvements which
could enhance one of our community facilities and encourage increased community
involvement in sport. 
3. Measures of success 
3.1  If the land is declared surplus to council requirements the council’s Estates team
within Asset & Procurement will determine future use in keeping with council policy. 
4. Supporting documentation 
Appendix 1 – Cartographic Drawing 48372 
James McKinstry
Chief Officer (Assets and Procurement) 
Page 99 of 376

Page 100

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 100 of 376

Page 101

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 101 of 376

Page 102

Appendix 1 – Cartographic Drawing 48372 
Page 102 of 376

Page 103

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref     Date 26/02/25 
Local government in Scotland: Financial Bulletin 2023/24 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail KempE@northlan.gov.uk Telephone 07939 280601 
Executive Summary 
The Accounts Commission published its 2023/24 Financial Bulletin on Local Government
in Scotland in January 2025.  See the full report at Appendix 1 or via  this link Local
government in Scotland: Financial bulletin 2023/24 | Audit Scotland. 
The report examines a number of areas including Council Funding and Budgets,
Financial Performance, Financial Position and outlook at end of 2023/24.  Members
should note the key facts and the four key messages, which are highlighted in the report
below along with context given to the relevance at North Lanarkshire Council. 
One of the key highlights is that councils’ total revenue and income fell in 2023/24,
reflecting another real terms decrease in revenue funding from the Scottish Government,
and highlights that Councils are increasingly reliant on identifying savings, which becomes
progressively more difficult year-on-year, and again used reserves to remain within their
agreed budgets. 
However as indicated in the report, this Council is already meeting the requirements
outlined in the Commission’s recommendations, and some of the tables and graphs
contained with the report evidence that.   
As members will appreciate financial sustainability is a top priority for North Lanarkshire
and is regularly reviewed as part of the Corporate Risk Register framework.  In addition,
longer term planning is integral to the Council’s Financial Strategy and the strategic
approach to budgeting. Thus, recognising that effective decision making relies on robust
financial planning, with the Medium-Term Financial Plan (MTFP) assisting in ensuring
resources are aligned to the key priorities outlined in The Plan for North Lanarkshire are
affordable and sustainable. 
Recommendations
It is recommended that the Finance and Resource Committee: 
(1)  Acknowledge the contents of the report.  
Item 11
Page 103 of 376

Page 104

1. Background 
1.1. In January 2025, Audit Scotland published the Local Government in Scotland:
Financial Bulletin 2023/24 on behalf of the Accounts Commission. The bulletin
discusses Council’s funding and budget-setting, financial performance and their
position at the end of 2023/24, and the financial outlook. 
1.2. The report is part of a series of overview outputs produced by the Accounts
Commission which together provide an independent overview of the financial and
operational performance of Scotland’s local government sector, with a budget briefing
examining the 2025/26 budgets set by councils due to be published in spring 2025,
and a report focused on service performance to be published later in 2025.   
2. Report 
2.1. The report examines a number of areas including Council Funding and Budgets,
Financial Performance, Financial Position and outlook at end of 2023/24.  The full
report is provided at Appendix 1 or can be accessed via  this link Local government in
Scotland: Financial bulletin 2023/24 | Audit Scotland.  Members should note the key
facts and the four key messages, which are outlined below along with context given to
the relevance at North Lanarkshire Council, in italics; 
2.1.1 In 2023/24, councils’ total revenue and income fell, including another real terms
decrease in revenue funding from the Scottish Government. Councils are increasingly
reliant on identifying savings, which becomes progressively more difficult year-on-
year, and again used reserves to remain within their agreed budgets.   
Members will appreciate North Lanarkshire Council has equally experienced the real
terms reduction in funding.  However, this Council has a robust Revenue Budget
Strategy in place which has ensured members are provided with sustainable budget
solutions, thus enabling members to make informed decisions around closing
challenging budget gaps.  Members have a strong record in approving difficult
recurring savings in the past, and in line with the Council’s Reserves policy have only
used reserves in a sustainable way.  Despite this good financial management, it is
acknowledged that delivering savings is becoming increasingly difficult to achieve. 
2.1.2 In 2023/24, capital funding remained constrained, with councils borrowing more and
managing a range of complex funding models. Capital funding from the Scottish
Government reduced slightly in real terms, continuing a longer-term trend. Capital
expenditure was lower than planned. Councils continue to borrow more to enable
investment in their estates and council debt, and annual interest costs, continue to
increase. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement 
Page 104 of 376

Page 105

These findings are also true in North Lanarkshire Council, however due to the
innovative Community Investment Fund that this Council has committed to for a
number years now, there continues to be significant investment in our assets, through
prudent, affordable and sustainable borrowing. 
2.1.3 In 2023/24, usable reserves, which are those that can be used to support service
delivery, reduced and most are already committed for specific purposes. This
presents an ongoing challenge for councils reliant on reserves to balance their
budgets, as well as to longer-term financial sustainability. Using reserves to routinely
balance budgets is not sustainable. 
This message is reflective of the approved Reserves Policy for the Council, which
means that reserves have not and are not permitted for use in an unsustainable way. 
2.1.4 Councils need to intensify transformation activity, progressing at scale and pace to
ensure their financial sustainability. How councils plan to use their reserves, make
savings and transform their services needs to become more transparent. The need to
consult local communities and clearly communicate the implications for local services
of the budget decisions taken has never been more important. 
Members are aware that The Plan for North Lanarkshire was established in 2019 with
a very clear vision - inclusive growth and prosperity for all to bring equal benefits and
a fairer distribution of wealth to all North Lanarkshire’s people and communities.  This
vision is about transforming the place that is North Lanarkshire.  
Approved by Policy and Strategy Committee in March 2023, the five year Programme
of Work to 2028 set out the plans to deliver these improvements against seven
priorities.   This was subsequently underpinned by Policy and Strategy approval of the
following of the Medium Term Financial Plan 2025/26 to 2029/30, the Strategic
Capital Investment Programme for 2024/25 to 2028/29 and The One Workforce Plan
in December 2024. The whole Council approach to transformation aims to progress at
pace and scale while ensuring activities are underpinned by sound financial
management, risk management, and corporate governance controls to ensure the
Council remains financially sustainable.  
Accounts Commission recommendations 
2.2. Members should also note that the report has made some recommendations to
Councils including: 
2.2.1 Report on the savings made within their management commentaries more
comprehensively, including provision of comparisons to savings targets agreed during
budget-setting, and whether they were recurring or non-recurring.   
2.2.2 Ensure that the impact of capital underspends, future borrowing projections and of
using financial flexibilities on their indebtedness are reported clearly alongside the
impact of these on future revenue budgets. 
2.2.3 Ensure reserves policies indicate explicitly and clearly the impact of financial flexibilities
on reserves held; the nature, level of and intended timing of the deployment of
committed usable reserves held; and the level of uncommitted and contingency funding
held within General Funds. 
Page 105 of 376

Page 106

2.2.4 Prioritise service transformation, considering the impact of current service delivery
models on longer-term financial sustainability, including the medium-term impact on
reserve levels. 
2.2.5 Ensure that financial sustainability becomes a central focus of financial monitoring and
reporting, making greater use of financial sustainability indicators within reports to
elected members and within their regular public reporting and financial strategies and
plans. 
2.2.6 Members will appreciate this Council is already meeting expectations outlined above,
and some of the tables and graphs contained with the report evidence that.  Financial
sustainability is a top priority for North Lanarkshire Council and is regularly reviewed as
part of the Corporate Risk Register framework.  In addition, longer term planning is
integral to the Council’s Financial Strategy and the strategic approach to budgeting.
Recognising that effective decision making relies on robust financial planning, with the
Medium-Term Financial Plan (MTFP) assisting in ensuring resources are aligned to the
key priorities outlined in The Plan for North Lanarkshire are affordable and sustainable. 
2.2.7 The key principles and framework of the Revenue Budget Strategy underpin financial
plans to ensure robust and financially sustainable decisions are taken in setting the
revenue budget. These principles are embedded the financial planning and budget
process to ensure the Council continues to manage the challenges it faces, minimising
cost and maximising resources, efficiencies and savings, in both the near and longer
term. 
3. Measures of success 
3.1  In this ongoing challenging financial environment this Council will continue to ensure
there are robust financial management arrangements in place to ensure it continues to
set a balanced budget, and that services are deliver within the financial resources
available, thus ensuring the Council remains financially sustainable over the medium
to long term. 
4. Supporting documentation 
Appendix 1 Local government in Scotland: Financial Bulletin 2023/24 
Elaine Kemp
Chief Officer (Finance) 
Page 106 of 376

Page 107

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 107 of 376

Page 108

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 108 of 376

Page 109

Local government in Scotland
Financial bulletin
2023/24
Prepared by Audit Scotland
January 2025
APPENDIX 1
Page 109 of 376

Page 110

2Financial bulletin 2023/24
Contents
Key facts 3
Key messages 4
Recommendations 6
Introduction 7
1. Council funding and budgets 9
2. Financial performance 15
3. Financial position and outlook 24
Appendix 1 34
Accessibility
You can find out more and read this report using assistive
technology on our website www.audit.scot/accessibility. Page 110 of 376

Page 111

3
Key facts
Some of these are based on a sample – see paragraph 4 for further information 
on our methodology
Funding and budgets
• 1.8 per cent: the real-terms reduction in revenue funding from the
Scottish Government in 2023/24 compared to 2022/23
• 21 per cent: the proportion of Scottish Government revenue funding
that was ring-fenced or directed towards national policy commitments in
2023/24
• £759 million: the budget gap identified by our sample of 29 councils at
the start of 2023/24. The 2024/25 budget gap identified by all 32 councils
was £585 million
• 1.2 per cent: the real-terms reduction in capital funding from the Scottish
Government in 2023/24 compared to 2022/23.
Financial performance
• 3.3 per cent: the real-terms reduction in councils’ total revenue funding
and income in 2023/24 compared to 2022/23
• 9 out of 29: the number of councils that reported overspends against
their agreed revenue budgets
• 11 out of 30: the number of councils that achieved all their planned
savings
• 25 out of 30: the number of councils that reported lower expenditure
than planned across their capital programmes in 2023/24
• £19.8 billion: councils’ net debt in 2023/24, a 15.8 per cent increase on
2022/23, as councils become more reliant on borrowing to finance their
capital programmes.
Financial position and outlook
• 5 per cent: the decrease in councils’ total usable reserves
• 84 per cent: the proportion of the General Fund that is committed
• 12 out of 29: the number of councils that made unplanned use of their
reserves in 2023/24 to manage budget pressures
• 15 out of 30: the number of councils that have long-term financial plans
in place, with councils reporting difficulty planning for the longer term due
to future uncertainty.
Key facts 3Key factsKey facts
Page 111 of 376

Page 112

4Key messages
Key messages
Key messages
Key messages
Despite an increase in overall revenue and capital funding
for councils in 2024/25, and the Scottish Government’s
budget proposals in December 2024 indicating a further real
terms uplift in funding for 2025/26, the financial outlook for
Scotland’s councils remains challenging.
1 In 2023/24, councils’ total revenue and income fell, including
another real terms decrease in revenue funding from the
Scottish Government. Councils are increasingly reliant on
identifying savings, which becomes progressively more difficult
year-on-year, and again used reserves to remain within their
agreed budgets.
2 In 2023/24, capital funding remained constrained, with councils
borrowing more and managing a range of complex funding
models. Capital funding from the Scottish Government reduced
slightly in real terms, continuing a longer-term trend. Capital
expenditure was lower than planned. Councils continue to
borrow more to enable investment in their estates and council
debt, and annual interest costs, continue to increase.
3 In 2023/24, usable reserves, which are those that can be 
used to support service delivery, reduced and most are already
committed for specific purposes. This presents an ongoing
challenge for councils reliant on reserves to balance their
budgets, as well as to longer-term financial sustainability. 
Using reserves to routinely balance budgets is not sustainable.
Page 112 of 376

Page 113

Key messages 5
4 Councils need to intensify transformation activity, progressing
at scale and pace to ensure their financial sustainability. How
councils plan to use their reserves, make savings and transform
their services needs to become more transparent. The need
to consult local communities and clearly communicate the
implications for local services of the budget decisions taken 
has never been more important.
Page 113 of 376

Page 114

6RecommendationsRecommendations
Recommendations
In 2025, councils should:
• Report on the savings made within their management commentaries more
comprehensively, including provision of comparisons to savings targets agreed
during budget-setting, and whether they were recurring or non-recurring
(paragraphs 29 - 30).
• Ensure that the impact of capital underspends, future borrowing projections and of
using financial flexibilities on their indebtedness are reported clearly alongside the
impact of these on future revenue budgets (paragraphs 34 - 41).
• Ensure reserves policies indicate explicitly and clearly the impact of financial
flexibilities on reserves held; the nature, level of and intended timing of the
deployment of committed usable reserves held; and the level of uncommitted and
contingency funding held within General Funds (paragraph 54 and Case study).
• Prioritise service transformation, considering the impact of current service delivery
models on longer-term financial sustainability, including the medium-term impact
on reserve levels (paragraphs 61 - 62).
• Ensure that financial sustainability becomes a central focus of financial monitoring
and reporting, making greater use of financial sustainability indicators within
reports to elected members and within their regular public reporting and financial
strategies and plans (paragraphs 63 - 67).
We note progress against the recommendations from our Financial bulletin 2022/23
in Appendix 1.
Page 114 of 376

Page 115

Introduction
About this report
1. This report is part of a series of overview outputs produced by
the Accounts Commission which together provide an independent
overview of the financial and operational performance of Scotland’s local
government sector.
2. This report examines councils’ financial performance in 2023/24.
This follows the unprecedented challenges of the Covid-19 pandemic
and cost-of-living crisis and sits against a backdrop of the whole of the
Scottish public sector facing challenges to its financial sustainability. 
The bulletin sets out:
• councils’ funding and budget-setting
• councils’ financial performance
• councils’ position at the end of 2023/24 and the financial outlook.
3. In spring 2025, we will publish a budget briefing examining the 2025/26
budgets set by councils, including analysis of anticipated budget gaps and
the decisions made by councils when setting their budgets. This will be
followed by a report focused on service performance later in 2025.
Methodology
4. The primary sources of information for this report are councils’
2023/24 accounts and annual audit reports, a data request issued to
councils in October 2024 and Scottish Budget documents.
5. Our findings are based primarily on:
• The 2023/24 annual accounts for 29 councils (20 audited and
nine unaudited). At our 2 December 2024 deadline, accounts
were unavailable for Clackmannanshire, Eilean Siar and East
Dunbartonshire and these councils are not included in our 2023/24
analysis (or comparisons to previous years).
• Supplementary information from 30 councils collected via a data
return issued to council directors of finance and was also reviewed
by appointed auditors. At our 25 November 2024 deadline, data
returns were unavailable for Clackmannanshire and Eilean Siar and
these councils are not included in our analysis. We also utilised
7Introduction
Page 115 of 376

Page 116

Introduction 8
elements of data returns previously submitted to us in support of
our Financial bulletin 2022/23 report.
• Scottish Government Budget documents. Our analysis of Scottish
Government funding reports on the funding position for all 32 of
Scotland’s councils.
6. When looking at trends, we convert some figures to real terms. 
This adjusts financial information from past and future years to prices for
the year under review (ie, 2023/24). This is to take account of inflation
so that trend information is comparable. To adjust for inflation, we use
gross domestic product (GDP) deflators, which are published quarterly by
HM Treasury. GDP deflators are the standard approach adopted by both
the UK Government and Scottish Government when analysing public
expenditure.
7. Financial trend data (both capital and revenue) relating to funding,
income or expenditure will generally be shown in real terms. Financial
information from the councils’ accounts’ balance sheets remains
unadjusted. This includes trend analysis on reserves, sources of capital
finance, borrowing and debt. These are not adjusted to real terms as they
are already subject to revaluations within the councils’ accounts to reflect
current prices.
Page 116 of 376

Page 117

1. Council funding 
and budgets
Both revenue and capital funding from the Scottish
Government to councils were reduced in real terms in
2023/24, with councils once again setting budgets that
required significant gaps to be addressed.
Councils are reliant on Scottish Government funding
which makes up over 60 per cent of income
8. As the largest source of funding or income for councils, at over 60 per
cent, Scottish Government funding shapes the fiscal environment that
councils operate in. Currently councils receive a single year settlement,
with a draft allocation published in the Scottish Budget in December. This
is revised throughout the year and in recent years a low initial settlement
has been followed by large additional transfers during the financial year.
9. In 2023/24, the Scottish Government allocated councils total revenue
and capital funding of £13.7 billion. This settlement was higher than
before the pandemic but in real terms funding was reduced year-on-year
since 2020/21. The 2024/25 settlement has reversed this trend and the
2025/26 draft settlement published in December 2024 indicates another
real-terms uplift in funding for councils (Exhibit 1, page 10).
10. This initial 2025/26 draft settlement allocates £15 billion of revenue
and capital funding to councils, a 5.8 per cent real terms increase on
the 2024/25 draft settlement. Increases to revenue funding include an
uplift to the general revenue grant, funding for pay awards and teachers’
pensions. Increases to capital include additional funds to support inter-
islands connectivity and climate change. There is still uncertainty as
to how increased employers’ National Insurance (NI) contributions,
announced by the UK Government, will be funded. The Convention of
Scottish Local Authorities (COSLA) estimates these will be an additional
£265 million cost pressure for councils in 2025/26.
11. The funding increase for councils recently announced as part of the
Scottish Government’s 2025/26 draft budget in December 2024 does
not change the fact that the financial outlook remains challenging 
(Part 3). We will examine the implications of the Scottish Budget for
councils’ own budget-setting in our next Local government in Scotland
publication, Local government budgets 2025/26.
91. Council funding and budgets
Page 117 of 376

Page 118

1. Council funding and budgets 10
Exhibit 1. 
Scottish Government revenue and capital funding to councils since 
2018/19 in real terms
Funding in 2023/24 was higher than before the pandemic but in real terms has reduced
year-on-year since 2020/21. This trend reversed in 2024/25 and 2025/26 sees a further
funding uplift.
2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2018/19
Outurn Autumn budget revision Draft budget
13
14.313.6 14.7 14.6 14.2 13.7 13.7
Funding was higher than before the
pandemic but in real terms has reduced
year-on-year since 2020/21
Funding increased in
2024/25 and 2025/26
sees another uplift
Draft Budget Allocation
Note: Draft budget allocations include transfers from other portfolios. 2020/21 and 2021/22 totals
include Covid-19 funding allocations. Barnett consequentials (and other funding) will be allocated to
2024/25 in the Spring Budget Revision. The draft 2025/26 settlement will be subject to additional
in-year allocations that are already included in earlier year totals.
Source: Scottish Government Budget documents
Revenue funding from the Scottish Government
fell by 1.8 per cent in real terms in 2023/24, despite
significant in-year allocations
12. In 2023/24, revenue funding from the Scottish Government (at the
spring revision) was £12.7 billion, a 4.2 per cent cash increase on the
previous year but 1.8 per cent lower in real terms. General revenue grant
funding and non-domestic rates combined decreased by 1.5 per cent.
Specific revenue grants saw no cash increase which meant a reduction
of 6.9 per cent in real terms.
£ billion
Page 118 of 376

Page 119

1. Council funding and budgets 11
13. Some further Scottish Government funding received by councils,
although not formally ring-fenced, is provided with the expectation that
it is directed to specific purposes. This is announced and distributed to
councils in-year. In 2023/24, councils received an additional £1.6 billion
at the autumn revision including additional funding to support teachers’
salaries as well as the expected transfers from other portfolios including
health and education. A further £0.3 billion was transferred from other
portfolios at the spring revision.
14. In 2023/24, we calculated that ring-fenced and directed funding
amounted to almost £2.7 billion, which is 21 per cent of Scottish
Government revenue funding to councils. This is lower than in 2022/23.
In the 2024/25 Scottish Budget, following a commitment in the Verity
House Agreement to reduce the level of ring-fenced funding, a number
of ring-fenced or directed items were ‘baselined’ into the general revenue
grant. This includes all £522 million of the early learning and childcare
specific revenue grant and £429 million of in-year transfers including adult
social care Living Wage funding, Free Personal and Nursing Care and
Free School Meals Intervention. While no longer ring-fenced, spending
will still need to be directed towards these policies. In the 2025/26
Scottish Budget, initial indications do not show any significant alterations.
Councils identified £759 million of budget gaps at
the start of 2023/24, and planned to use savings and
reserves to address these
15. Councils set their own budgets in February and March for the
financial year ahead using the initial allocation from the Scottish
Government. At the time of setting their 2023/24 budgets, councils in our
sample of 29 identified a cumulative budget gap of at least £759 million
for the year. This represented a budget gap of 4.8 per cent of the total
net cost of services.
16. To close the budget gap and set a balanced budget, councils took a
range of actions. Over 90 per cent was covered by agreeing:
• to make £260 million of recurring savings (34 per cent of the total
share)
• to make a further £30 million of non-recurring, one-off savings 
(four per cent)
• to use £202 million of reserves (26 per cent)
• to raise £144 million through increases to council tax (19 per cent)
• to use £73 million of funding released via application of financial
flexibilities (nine per cent)1 (Exhibit 2, page 13).
1 The budget gap and values that make up the bridging actions vary from those published in last
year’s Financial bulletin as the sample is different and additional data returns were received post
publication that are now included.
During the budget-
setting process,
councils may
identify a budget
gap, which is the
difference between
their anticipated
expenditure for the
year and the funding
and income they
expect to receive.
Councils will identify
and agree bridging
actions to allow them
to set a balanced
budget. This may
include an agreement
on savings to be made
during the year.
Page 119 of 376

Page 120

1. Council funding and budgets 12
17. The use of reserves and other non-recurring measures is
unsustainable and is only a temporary plug for a budget gap in that one
year. The gap will remain in future years until recurring measures such
as recurring savings or increases to income are found or the service cost
base is reduced.
18. The setting of council tax levels is an important mechanism available
to councils in delivering a balanced budget. In 2023/24, councils
increased their tax by an average of 5.4 per cent. This was used to
bridge 19 per cent of the overall budget gap. The Scottish Government
imposed a council tax freeze for 2024/25, instead providing £144 million
to ‘fully fund’ the freeze to the equivalent of a five per cent increase. The
Cabinet Secretary for Finance and Local Government confirmed during
her budget statement in December 2024 that there will be no council tax
freeze or cap for 2025/26.
Page 120 of 376

Page 121

1. Council funding and budgets 13
Exhibit 2. 
The bridging actions councils identified within their 2023/24 budgets 
as a proportion of net cost of services
Recurring savings and using reserves made up the majority of how councils intended
to meet their identified budget gaps.
Fife
Glasgow
Dundee
East Ayrshire
Renfrewshire
North Lanarkshire
Dumfries and Galloway
Inverclyde
Midlothian
East Lothian
West Lothian
Aberdeenshire
City of Edinburgh
Argyll and Bute
Scottish Borders
South Ayrshire
North Ayrshire
Stirling
East Renfrewshire
Falkirk
Perth and Kinross
Aberdeen
Angus
Highland
West Dunbartonshire
South Lanarkshire
Moray
Scotland
0% 1% 2% 3% 4% 5% 6% 7% 8% 9%
Increase to council tax
Use of reserves Financial flexibilities Other
Agreed savings recurring Agreed savings non-recurring
Note: In addition to the three councils whose 2023/24 annual accounts were not available, Shetland
and Orkney are excluded from this chart as both are outliers due to their high use of reserves to set
their budget, reflecting the councils’ regular utilisation of the returns from significant investments and
harbour income. Shetland’s bridging actions made up 35 per cent of their net cost of services (over 80 per
cent of which related to reserves use). Orkney’s bridging actions made up 13 per cent of their net cost of
services (of which over 90 per cent was use of reserves).
Source: Council data returns (2023) and Councils’ annual accounts 2023/24 (audited and unaudited)
Page 121 of 376

Page 122

1. Council funding and budgets 14
With Scottish Government capital funding remaining
constrained, councils are increasingly reliant upon
borrowing to fund planned investment decisions
19. Capital funding from the Scottish Government (at the spring revision)
fell by 1.2 per cent in real terms between 2022/23 and 2023/24 and
was 21 per cent lower than 2018/19. Both the general capital grant and
specific capital grant have decreased in real terms. The specific capital
grant, the proportion of funding that is ring-fenced for specific uses, 
was much lower than five years ago and has been relatively static for
the past three years. This is due to the completion of the capital element
of the Early Learning and Childcare Expansion Programme. Councils
received £70 million of capital funding for use in 2023/24, by allowing 
an equivalent amount of revenue reserves to be released, and a further 
£22 million of funding to support the cost of local government pay
awards (for example by allowing councils to use this instead of planned
transfers from revenue budgets).
20. Capital funding was reduced further in 2024/25. The initial draft
allocation for 2025/26 saw an increase compared to 2024/25 but capital
funding remains lower than 2023/24 and earlier years. The longer-term
reduction in capital grants means councils are having to finance their
chosen investment in new facilities by other means. Councils are now
more reliant on other sources of finance, such as borrowing, transfers
from their revenue budgets and making use of financial flexibilities, than
has previously been the case (paragraphs 33 - 41).
Page 122 of 376

Page 123

15
2. Financial performance
Councils increasingly relied on savings and reserves to
ensure they remained within agreed revenue budgets;
capital expenditure was lower than planned and borrowing
increased. Improvements in how councils report their
savings are still needed.
Councils’ total revenue funding and income fell by 3.3 per
cent in real terms in 2023/24, with income from service fees
still below pre-pandemic levels.
21. In addition to Scottish Government funding and council tax, councils receive
funding and income from several other sources, including fees and charges for
using services and council house rents (Exhibit 3).
22. In 2023/24, from our review of 29 councils’ annual accounts, councils received
£21.2 billion in revenue funding and income. This is £540 million more than 2022/23
but represents a real terms decrease of 3.3 per cent (£725 million) as increases in
income have not kept pace with inflation. In 2023/24, total funding and income fell
back to 2019/20 levels.
2. Financial performance
Exhibit 3. 
Sources of council funding and income in 2023/24
The proportion of funding from each source is similar to 2022/23.
GRG
NDR
Council Tax
Grants (including Scottish
Government & others)
Customer and
client receipts
HRA rents
Interest receivable
& similar charges 1% (£0.2 billion)
7% (£1.4 billion)
9% (£1.8 billion)
16% (£3.4 billion)
13% (£2.8 billion)
14% (£3 billion)
40%
(£8.5 billion)
Note: Interest receivable refers to the interest that has been earned by investments, loans, or income
to be received from overdue invoices.
Source: Councils’ annual accounts 2023/24 (audited and unaudited) (based on 29 annual accounts)
Page 123 of 376

Page 124

2. Financial performance 16
23. Council tax is an important source of income for councils, providing
£2.8 billion in 2023/24. The proportion has remained static for the last
five years at around 13 per cent of total funding and income. In 2023/24,
councils received £11 million more income from council tax than in
2022/23, which is a 0.4 per cent real terms increase.
24. Income from customer and client receipts dropped significantly during
the pandemic and has not yet returned to previous levels. Customer and
client receipts are 12 per cent (£253 million) lower in real terms than in
2019/20. Councils reported receiving lower income than budgeted for
as a reason for service overspends in 2023/24 across a broad range
of services, with parking and waste the most common. However, the
picture is mixed and for some councils and service areas increased
income offset expenditure and led to services underspending against
their budgets. Income generation, and the limited capacity to increase
this, was cited by a number of councils as a risk to financial sustainability.
Overall, councils remained within their agreed
revenue budgets, but some services spent more 
than planned
25. In 2023/24, councils managed net budgets of around £15 billion,
compared to £13.4 billion in 2022/23. Overall, councils reported a
revenue budget underspend of £111 million or 0.7 per cent. This is around
half the variance seen in 2022/23. Since 2019/20 there has been a small
overall underspend each year and, except for 2020/21, this variance has
decreased year-on-year. Despite the overall underspend, nine reported
overspends against their agreed revenue budgets.
26. Councils reported both underspends and overspends at a service
level, with workforce issues and income a common theme for both
(Exhibit 4, page 17).
Page 124 of 376

Page 125

2. Financial performance 17
Exhibit 4. 
Council overspends and underspends at a service level and reasons 
for them
Workforce issues and income generation are a common theme for both.
Service area Reasons for
Overspends
• Reported in a wide range of
service areas with culture and
leisure, children and families,
education and adult social care
being noted most often.
• Service area overspends were
mostly attributed to a lack of
funding, workforce pressures
and general cost increases.
• Underperformance of a range of
income streams also contributed
to overspends in some councils.
Underspends
• Education and early years were
referred to most often.
• Communities, culture and
leisure, and planning and
economic development were
also identified by some councils
as areas of underspend.
• Underspends in education and
early years were often attributed
to lower than anticipated
demand and unfilled staff
positions.
• Underspends were sometimes
attributed to more favourable
income position, such as
generating greater income than
budgeted for and receiving
additional VAT reimbursements.
• Workforce issues, such as
challenges with recruitment,
and high vacancy levels, were
also identified as a cause of
underspends.
Note: Culture and leisure services were reported in both but twice as often as an area of overspend
than an underspend.
Source: Council data returns
Page 125 of 376

Page 126

2. Financial performance 18
Councils delivered significant savings, but some
remain reliant on one-off measures and reporting
against savings targets should be more transparent
27. From our sample of 30, 28 councils set a savings target in 2023/24,
totalling £362 million, with £332 million (92 per cent) being achieved.
This is significantly higher than the savings target reported by the same
councils last year (£214 million).
28. Of the 30 councils:
• eleven achieved their full savings target or more
• thirteen missed their target but achieved 80 per cent or more
• four achieved less than 80 per cent of their target
• two councils (Fife and Orkney) did not have savings targets 
in place.
29. Not all councils could split savings targets or achieved savings
information into recurring or non-recurring categories. Where we have a
breakdown of how savings were achieved (27), 85 per cent (£244 million)
were achieved on a recurring basis, compared to 82 per cent in 2022/23. 
Non-recurring savings accounted for 15 per cent of total savings
achieved, at £42 million (Exhibit 5, page 19).
Page 126 of 376

Page 127

2. Financial performance 19
Exhibit 5. 
Proportion of savings targets achieved in 2023/24, split by recurring and
non-recurring savings (based on 27 councils that can split their savings in
this way)
Some councils continue to rely upon one-off measures to deliver in-year savings.
0 20 40 60 80 100 120
Shetland
East Dunbartonshire
Scottish Borders
Aberdeenshire
Highland
Falkirk
Argyll & Bute
South Ayrshire
Midlothian
East Lothian
Stirling
City of Edinburgh
Glasgow
Dumfries & Galloway
Perth & Kinross
North Ayrshire
Angus
East Renfrewshire
West Dunbartonshire
Renfrewshire
South Lanarkshire
East Ayrshire
North Lanarkshire
Inverclyde
West Lothian
Dundee City
Moray
Scotland
Percentage
% of total target  - recurring
% of total target  - non-recurring
Note: In addition to the two councils that did not submit a data return, a further three councils are
excluded from this exhibit. Aberdeen City sets a savings target to be achieved in the year but does
not differentiate between recurring and non-recurring savings for monitoring purposes. The savings
target was achieved for 2023/24. Fife and Orkney did not have a savings target in place in 2023/24.
Source: Council data returns
Page 127 of 376

Page 128

2. Financial performance 20
30. In our Financial bulletin 2022/23 we recommended that councils
prioritise the achievement of recurring savings and avoid reliance
on non-recurring measures. The overall extent of progress against
our recommendation is difficult to assess due to a lack of detail and
transparency in reporting on savings performance. Non-recurring savings
are not always included in savings targets or performance information so
it remains difficult to assess the overall reliance on these or, indeed, the
overall savings achieved.
31. Additionally, a review of management commentaries within annual
accounts found that not all councils are reporting progress against
savings plans and, for the majority that are, these largely focus on their
previous or future plans. The majority lacked detail on areas such as
performance trends and, again, often did not report if savings were
recurring or non-recurring.
32. Councils have identified the need to generate future savings as
they undertake wider-scale transformation, redesign how services
are delivered and consider their future policies on fees and charges
for accessing services. This will need to be done in consultation with
their partners and citizens. Councils should report more transparently
the nature of their savings and how these could impact services on an
ongoing basis.
Capital expenditure was 20 per cent lower than
planned and funded by increased borrowing
33. The value of council estates, mainly council owned property
(including buildings and schools) and equipment, increased by £5 billion
in 2023/24 to £51 billion. This reflects continuing investment by councils
and, in 2023/24, capital expenditure was £3.5 billion. This is comparable
in cash terms to 2022/23. Borrowing increased again in 2023/24 to 
£1.7 billion, a significant increase of £406 million (31 per cent) since
2022/23, and up £1.2 billion (196 per cent) since 2018/19. Borrowing
was used to finance 49 per cent of total capital expenditure (Exhibit 6,
page 21).
34. From our sample of 30 councils providing information through the
data return, 25 reported a capital underspend in 2023/24 of £755 million.
This equates to 20 per cent of councils’ total capital budget. This is less
than the underspend of 24 per cent in 2022/23; however, it is still higher
than the 17 per cent reported in 2018/19. Significant underspends were
reported for both General Fund (23 per cent of budget) and HRA 
capital programmes (15 per cent of budget). Councils reported a range 
of project types and reasons for why capital underspends had occurred
(Exhibit 7, page 21).
Page 128 of 376

Page 129

2. Financial performance 21
Exhibit 6. 
Capital expenditure split by sources of finance, in cash terms
Borrowing and government grants remain the most significant means of financing
capital investment.
2022/23 2023/24
-0.5 0 0.5 1 1.5 2
Other contributions and
Public Private Partnership (PPP)
Internal loans fund
repayments available to reinvest
Government grants
Capital receipts
Capital Funded from
Current Revenue (CFCR)
An increase in borrowing
billion
Note: Internal loans fund repayments are an annual charge that recognise capital costs in the revenue
budget. Once repaid, they allow borrowed funds to be used elsewhere. Capital receipts are income
councils generate from selling existing assets. Revenue transfers is capital expenditure funded from
service revenue budgets.
Source: Councils’ annual accounts 2022/23 and 2023/24 (audited and unaudited)
Exhibit 7. 
Type and reasons for underspends on councils’ capital programmes
Project type Reasons for
Underspends
• School and early learning building
projects. 
• Housing projects.
• Large-scale infrastructure projects
(with a small number of councils
underspending in relation to
projects being delivered as part of
their City Deals).
• Project and programme slippage,
caused by a range of supply chain
and capacity issues.
• Project delays caused by cost,
contract and legal negotiations and
unexpected issues arising during
the course of works.
• Project deferment.
Source: Council data returns
Page 129 of 376

Page 130

2. Financial performance 22
35. Managing their capital programmes is an important tool for councils
to control their annual expenditure. All but two councils reported having
a multi-year capital plan in place. These covered a range of periods from
five to 30 years, with most covering five to ten years. South Lanarkshire
and Stirling councils both reported only having an annual capital plan in
place. A multi-year plan allows councils to manage their capital spending
over this period.
36. However, consistently failing to invest in estates and infrastructure
increases the risk that asset failures may impact services, projects will
become more expensive to deliver, and that maintenance spending will
need to increase due to assets becoming older. It also impacts the ability
of councils to manage their overall estates, identify surplus assets and
consider the efficiency of partnership working, including co-location with
other services.
Borrowing means debt has again increased, 
and further borrowing will be needed to invest 
in new schools
37. Due to the increased reliance on borrowing to fund investment,
councils’ net debt has now risen to £19.8 billion. This is an increase of
15.8 per cent from 2022/23 and a 29.7 per cent increase since 2018/19.
All but one council increased their debt in 2023/24. The cost of servicing
debt has risen, with a 16 per cent rise in interest payable and similar
charges since 2022/23. Interest payable as a proportion of net cost of
services, was six per cent compared to five per cent in 2022/23.
38. Under LEIP, councils borrow to meet the cost of building new
schools, with the Scottish Government providing revenue grant funding
over a 25-year period linked to specific outcomes (maintenance, energy
efficiency, digital infrastructure and job creation) to meet maintenance
and life-cycle costs. Councils, however, need to fund the £1 billion cost
of building schools, including any interest on the money borrowed to
fund this. The programme has faced significant delays and cost increases
and, to complete the programme by the planned date of 2027, significant
further borrowing by councils will be needed.  
39. Alongside investing and maintaining their own estates, councils
have made use of a range of different Public Private Partnership (PPP)
contracts to invest in their estates. A number of earlier Private Finance
Initiative (PFI) contracts are now nearing the end of their terms. Councils
are having to prepare for, and manage, complex closing arrangements.
Councils have already entered into negotiations relating to contracts that
are ending, with 10 PFI contracts due to expire by the end of 2030.
In September
2019, the Scottish
Government
announced it would
support £1 billion of
capital investment
in the school estate
on a match-funding
basis. In consultation
with councils, this
created a joint £2
billion Learning
Estate Improvement
Programme (LEIP),
enabling additional
investment without
the use of private
finance contracts.
Councils provide
upfront capital
funding and Scottish
Government revenue
follows over 25 years
for achievement of
outcomes.
Page 130 of 376

Page 131

2. Financial performance 23
40. By making use of financial flexibilities across 2022/23 and
2023/24, councils have been able to reprofile the debt associated
with PPP contracts. This has allowed councils to recognise significant
gains from annual contractual payments they have previously made,
recognising these within their usable reserves. Future capital expenditure
will be able to be offset against these, but they are not cash backed.
This means the need for councils to borrow to finance their future capital
investment has not changed, nor have their current external debts.
Alongside LEIP projects, councils have already committed to significant
future borrowing.
41. Councils set and agree their borrowing and treasury management
strategies individually, deciding on what is a prudent and affordable level
of debt under the Prudential Code. As part of this, a range of indicators
are considered, including the cost of servicing their debts, to show that
capital plans are affordable and sustainable. Increased borrowing means
increased costs that will need to be met annually from revenue budgets.
While auditors have not expressed specific concerns about the level of
borrowing (in the 15 annual audit reports that were available at the time
of our review), it is a factor in the assessment of financial sustainability
and auditors are expressing greater concerns about the overall financial
sustainability of councils (paragraph 58).
Between 2020 and
2024, the Scottish
Government
permitted councils
to make use of a
range of financial
flexibilities to
manage financial
pressures. One of
these related to
service concessions
(including PPP) and
allowed councils
to reprofile debt
repayments. This
offered an immediate
benefit of significant
one-off increases to
reserves but these
are not cash backed,
and debt payments
will need to be made
for longer, deferring
costs to later years
which has implications
for future revenue
budgets.
Page 131 of 376

Page 132

24
3. Financial position 
and outlook
Using reserves to manage financial pressures and stay
within agreed budgets is not sustainable. Usable reserves
fell in 2023/24, and most are committed for specific
purposes. Progress on transformation and reform must 
be prioritised to ensure longer-term financial sustainability.
Councils’ usable reserves remain higher than before
the pandemic, mainly due to the use of financial
flexibilities, but decreased in 2023/24 
42. Holding and using reserves is a normal, and helpful, way of 
managing council finances but reserves are a one-off resource meaning
councils need to carefully plan and monitor how these are being used.
Using reserves to support services in the short term is not sustainable
unless they are used to support service transformation and generate
future savings.
43. In 2023/24, councils’ total usable reserves decreased by five per
cent to £4.1 billion which equates to around 25 per cent of net cost of
services. The overall decrease is attributed to a fall in capital reserves
along with a very modest increase in revenue reserves (Exhibit 8, 
page 25).
44. Usable reserves remain £1.66 billion higher than before the
pandemic. Revenue reserves were boosted in recent years by:
• Covid-19 funding, but these are largely exhausted with only around
£67 million remaining earmarked (2.8 per cent of the committed
General Fund balance)
• making use of financial flexibilities related to service concessions,
resulting in reprofiled debt and significant one-off increases to
reserves. Although an accounting adjustment, and not cash backed,
these can be used to support services.
3. Financial position and outlook
Usable reserves can
be used to support
service delivery,
and to meet in-year
expenditure (and are
sometimes referred
to as cash backed
reserves).
Unusable reserves
represent accounting
adjustments to reflect
things such as an
increase in the value
of council-owned
buildings. They
generally cannot be
routinely accessed
or used to support
services. 
Page 132 of 376

Page 133

3. Financial position and outlook 25
Exhibit 8. 
Councils’ usable reserves, 2023/24 compared to 2022/23 and 2018/19
Revenue reserves are higher than pre-pandemic but have remained relatively static 
in the last year.
0
.5
1
1.5
2
2.5
3
3.5
4
£ billion
Revenue Capital
2018/19 2022/23 2023/24
Note: Total usable reserves were £4.1 billion in 2023/24. Between 2022/23 and 2023/24 revenue
reserves increased by 0.8 per cent, capital reserves fell by 33 per cent. Total usable reserves are 
68 per cent higher than in 2018/19, up from £2.4 billion (90 per cent increase in revenue reserves,
four per cent decrease in capital reserves)
Source: Councils’ annual accounts 2023/24 (audited and unaudited)
Page 133 of 376

Page 134

3. Financial position and outlook 26
45. The overall decrease in usable reserves in 2023/24 is notable as they
have been increasing significantly in recent years. Two-thirds of councils
still increased their total usable reserves, but this is largely attributable
to councils making use of financial flexibilities (a number of councils
accounted for this in 2022/23, while others introduced it in 2023/24).
46. Around a third of councils saw their total usable reserve fall in
2023/24, including some large decreases related to the drawing down
of committed reserves. These reserves were used for Equal Pay
settlements, pay awards, budget support and the further deployment 
of Covid-19 reserves.
General Fund reserves increased slightly but over 
80 per cent are committed for specific purposes
47. General Fund reserves (excluding the HRA element which not
all councils have) continued the upward trend of the past five years,
increasing by three per cent in 2023/24 to £2.8 billion. This equates to 
17 per cent of net cost of services and is driven by growth in committed
reserves. Uncommitted reserves have remained constant at between
two and three per cent of net cost of services (Exhibit 9, page 27).
48. In 2023/24, over 80 per cent of the General Fund was committed.
This means that it has been allocated for specific purposes and is not
readily available for other uses.
The General Fund
is the principal usable
revenue reserve held
by councils. It can be
used for a wide range
of purposes, including
bridging budgets gaps
as it can be used to
finance spending on
services or some
elements of capital
spending.
The Housing Revenue
Account (HRA)
reserve can only be
used to fund spending
on council-owned
housing.
Committed reserves
have been allocated (or
earmarked) for specific
purposes and are not
readily available for
other uses.
Uncommitted
reserves can be
deployed more easily
and, because of the
nature and scale of
it, the uncommitted
element of the
General Fund can
be considered to
represent a degree of
contingency funding.
Page 134 of 376

Page 135

3. Financial position and outlook 27
Exhibit 9. 
Councils’ General Fund balance between 2018/19 and 2023/24, 
split by committed and uncommitted
General Fund reserves are increasing but over 80 per cent is committed.
2019/20 2020/21 2021/22 2022/23 2023/24 2018/19
General Fund committed General Fund uncommitted
£730m
£360m
£848m
£467m
£0.9bn
£0.3bn
£0.9bn
£0.3bn
£1.9bn
£0.4bn £2.2bn
£0.4bn
£2.3bn
£0.4bn
£2.4bn
£0.5bn
Source: Councils’ annual accounts 2023/24 (audited and unaudited)
Some councils’ levels of uncommitted reserves are
low, but they have specific reserves earmarked for
contingency
49. Councils have reserve policies in place, which set out the rationale for
the minimum level of uncommitted reserves held by the council. Most
have an agreed minimum level, usually two per cent of their net budgeted
revenue expenditure, although four councils have set this higher.
50. In 2023/24, nine councils had an uncommitted reserves level of less
than two per cent of net budgeted revenue expenditure. However, a
review found that in many cases these low reserve levels were planned
decisions and the levels were deemed to be sufficient and/or supported
by additional committed funds for contingencies. Aberdeenshire, South
Ayrshire and West Dunbartonshire all had uncommitted reserves below
their minimum level and intend to review this during 2024/25.
Page 135 of 376

Page 136

3. Financial position and outlook 28
51. While councils hold uncommitted reserves for contingencies,
around a third reported also earmarking some reserves specifically for
contingencies to either manage budget risks or specific risks, such as
adverse weather. The nine councils providing information on the value of
the reserves earmarked for contingencies reported a total of £50 million.
Councils continue to use their reserves to manage
budget pressures, but this is not sustainable
52. While overall usable reserves levels remain high, there is evidence
that councils are continuing to use reserves to support service spend and
this is not sustainable. In 2023/24:
• Councils bridged over a quarter of their budget gap using reserves
(£202 million).
• Twelve councils reported making unplanned use of reserves in
2023/24, to support in-year spending and to balance the outturn
position. This was most often to cover the cost of the 2023/24
pay award; to address specific service or project pressures, or to
provide financial support to IJBs.
53. Usable reserves held as a proportion of spending has reduced. 
In 2023/24, 15 councils held usable reserves that were over 20 per cent
of their net cost of services, which is less than 2022/23 (20 councils) but
still higher than before the pandemic (nine councils). This indicates that
reserves are increasing at a slower rate than expenditure, even with use
of financial flexibilities. One council had total usable reserves of less than
ten per cent of their net cost of services. 
Councils could improve how clearly they report on
how they intend to use their reserves
54. With the use of reserves to support services and the low level of
uncommitted reserves across the sector it is increasingly important that
councils report how and when the intend to make use of their reserves
(Case study 1, page 29).
Page 136 of 376

Page 137

3. Financial position and outlook 29
Case study 1. 
Councils could be more transparent within their published plans about
how they intend to make use of reserves
A review of councils’ management commentaries found that all councils
clearly identify key areas of reserves and explain their purpose, with most
identifying their minimum reserve level.
All but two councils reported, through their data return, that they formally
document or publish at least some information about their committed
reserves. Committed reserves information is usually documented in
councils’ accounts or financial outturn reports, and sometimes in other
formats, such as reserves reports. Few councils reported documenting
information in performance monitoring reports.
Nearly all councils publish and document a full costed breakdown of
committed reserves categories and details of what has been drawn
down within the year. Although most formally document what is
committed for major initiatives, this information is not always published.
Only two thirds of councils document or publish information on planned
spend for future years.
Source: Council data returns and Council annual accounts 2023/24
(audited and unaudited)
Recent changes to pension contribution rates offer
councils a short-term window to reduce costs
55. The result of the 2023 triennial revaluation showed a significantly
improved funding position across Scotland’s 11 local government pension
funds. Councils are using this as an opportunity to lower their employer
contributions and reduce their costs in the short-term. The 12 councils
who are members of Strathclyde Pension Fund are reducing their
contribution rates from 19.3 per cent to 6.5 per cent for 2024/25 and
2025/26 (increasing to 17.5 per cent in 2026/27), significantly reducing
their annual contribution costs for two years. Other councils are making
more modest reductions to their contribution rates of between two and
three percentage points.
Ensuring medium- and long-term financial
sustainability is a significant challenge
56. The risks to financial sustainability are well known. These include
external factors such as increased demand, demographic changes and
the need to invest significantly to address certain policy areas such as
climate change and its impact. There are also specific pressures that
councils identified as presenting risks to achieving future financial balance/
sustainability including:
Page 137 of 376

Page 138

3. Financial position and outlook 30
• Uncertainty about future funding: single-year settlements,
ring-fencing of funding and directed funding for specific Scottish
Government policies limiting local flexibility (for example, teacher
numbers, social care provision and IJB allocations).
• Council tax freezes: while there is no freeze in 2025/26, the
Scottish Government froze council tax between 2008/09 and
2016/17, and in 2021/22, and capped increases at three per cent in
2017/18 and 2018/19. The risk of future freezes is seen as a main
challenge to ensuring medium- to long-term financial sustainability.
Even when ‘fully funded’ a council tax freeze suppresses the
growth of the council tax base over that period and the income
generated when the freeze is lifted is lower than if councils were
able to make tax-raising decisions at a local level.
• Pay awards and employers’ NI costs: overspends have been
caused by pay awards, with some councils reporting that the
budgets provided are not enough to cover the costs or these costs
are unfunded. In 2023/24, three councils made unplanned use of
reserves to meet pay awards and there is ongoing uncertainty about
the scale of future annual offers. There is now also uncertainty over
how increased employers’ NI contributions will be funded.
• Inflationary pressures: general pressures and some specific
issues that impact the delivery of capital programmes (costs of
goods and services, service demand, public perception, borrowing,
funding, increasing standards and difficulty with asset sales).
• Savings: some councils cited the challenge of identifying and
achieving recurring savings.
57. Most councils reported that financial sustainability was a significant
challenge. Some specific challenges reported by councils include:
• Angus Council reported the need for change if they are to be
financially sustainable over the medium to long term. The scale of
reductions required could leave some services unable to function.
• East Lothian Council identified critical risks to its fiscal sustainability
and reported managing their financial environment as the highest
ever scoring risk on their Corporate Risk Register.
• Inverclyde Council reported that ongoing depopulation may mean
significant future funding reductions.
• Orkney Islands Council highlighted the growing contribution from
reserves to meet in-year service costs as being unsustainable.
• Shetland Islands Council reported they were financially
unsustainable on the basis of current plans.
Page 138 of 376

Page 139

3. Financial position and outlook 31
58. Alongside councils’ own assessment of their financial sustainability,
many auditors highlighted in their 2023/24 annual audit reports (15
available for review) the challenges councils face in achieving financial
balance in future years and securing long-term financial sustainability. 
These centred on the scale of budget gaps; the need to keep on top of
savings plans; low levels of uncommitted reserves; unsustainable cost
bases and the difficult choices to be made.
Councils have medium-term financial plans in place
but must now make progress on transformation 
and reform
59. While several councils reported confidence that they had robust
processes and actions in place to ensure they were financially
sustainable, councils largely reported that it is difficult to plan into the
future without clarity on medium- or long-term government funding and
priorities, stating there is general economic uncertainty and volatility.
This difficulty, however, underlines the importance of councils ensuring
that they have a clear understanding of risks to their financial positions,
effective risk management processes to monitor these, and indicative
forecasts informed by scenario planning.
60. All councils that provided data returns to us reported having medium-
term financial plans in place, with most of these spanning 3-5 years 
(25 out of 30 councils). Most councils (25) reported that they reviewed
their financial plans in 2024. Half of councils (15 out of 30) have a long-
term financial plan in place and, for those that do, most cover a 10-year
period.
61. As we set out in our recent Transformation in councils report,
councils must prioritise and progress the delivery of their plans for
transformation. And a step change is needed in terms of scale and
pace. That could look like new innovative approaches to service delivery,
reconsidering which services could be more effectively delivered by other
partners, exploring opportunities for new income generation (including
those that are being legislated for) or identifying how economies of scale
could be achieved by sharing services.
62. Delivering transformation successfully requires resources to be
committed towards it and it is positive to see that most councils 
(27 from our data return sample of 30) reported holding reserves
earmarked for transformation. Glasgow, Orkney and Shetland did not. 
Of the 26 providing information on the value held, a total of £270 million
was reported which is about 13 per cent of committed General Fund
balance and equates to two per cent of the net cost of services. Most
councils’ transformation reserves were equivalent to two per cent or
lower of net cost of services, but some earmarked a significantly higher
proportion. Argyll and Bute earmarked the equivalent of ten per cent of
net cost of services, Scottish Borders six per cent, and Aberdeenshire,
East Lothian and Highland all earmarked five per cent.
Transformation is
our next Best Value
thematic focus and
we will be auditing
councils’ plans for
transformation as 
part of the 2024/25
annual audit.
Page 139 of 376

Page 140

3. Financial position and outlook 32
Councils could make more use of financial
sustainability indicators, including to inform their
longer-term planning
63. Assessing and monitoring financial sustainability is essential. Councils
use a range of indicators to do so, but the type used, and extent of their
use, varies. The Local Government Benchmarking Framework includes
sustainability indicators, currently being reviewed by Directors of Finance,
to ensure that they remain appropriate, and CIPFA also recommends
indicators. Councils are not required to use specific indicators and have
discretion as to how they assess their own financial sustainability. 
64. We asked councils how they assess and monitor financial
sustainability, including how this is reported to elected members:
• Around three-quarters of councils use the Local Government
Benchmarking Framework Indicators and the CIPFA level of
reserves indicator. 
• Around a third of councils use the CIPFA change in reserves and
reserves sustainability measures.
• Some councils reported that they use their own equivalent
calculations or different indicators including outturn against
expenditure, ratio of council tax to overall funding, ratio of financing
costs to net revenue stream, external debt and borrowing levels,
and recurrent versus non-current budget mitigation.
65. Most councils reported that they assess and monitor financial
sustainability more generally, such as via the regular monitoring of
budgets, reserves and the capital financing requirement; and carrying out
periodic risk assessments. For example, East Ayrshire Council’s ‘East
Ayrshire Performs’ reports financial and service performance information
about the council publicly, including a suite of financial resilience
indicators, focusing on council reserves and liquidity but also capital
financing, investment and borrowing.
66. Most councils include and consider financial indicators within
their financial plans, with 17 councils including an analysis of financial
sustainability and/or resilience indicators within their medium-term
financial plans and nine within their longer-term plans.
67. All councils reported to us that elected members had been provided
with a summary of the council’s medium- to long-term financial
sustainability but more needs to be done to regularly and formally report
upon the consideration of financial sustainability. This should be reported
publicly, as a minimum, as part of annual budget-setting papers and
within annual refreshes of financial plans.
Page 140 of 376

Page 141

3. Financial position and outlook 33
Financial outlook
68. Within this report we outline the financial challenges Scotland’s
councils are now facing. While indications are that the 2025/26 budget
will result in increased funding, and councils are now free to vary council
tax rates, it is unlikely that increased funding and income will be able
to keep pace with increasing costs. In recent years councils have been
able to increase the reserves they hold, but much of this has been due
to additional Covid-19 funding, use of financial flexibilities and other one-
off actions. The initial benefits of these measures, and the reserves
that councils were able to build, do not negate the need for significant
reform and transformation. 2023/24 saw a reduction in usable reserves
and while this represented only five per cent of these reserves, this was
equivalent to over eight per cent of the usable reserves held as recently
as 2019/20.
69. How councils plan to use their reserves, make savings and
transform their services needs to become more transparent as financial
sustainability issues are to be addressed. The need to consult local
communities and clearly communicate the implications of budget
decisions has never been more important.
70. Our next Local government in Scotland publication, Local
government budgets 2025/26, will examine the steps that Scotland’s
councils take as they set their budgets for 2025/26, setting out the
finalised funding settlement from the Scottish Government, decisions
taken in setting council tax and the steps they intend to take to fund and
transform services.
Page 141 of 376

Page 142

Appendix 1
Progress against the recommendations in Local
Government in Scotland Financial Bulletin 2022/23
Councils should: Progress/ status
Prioritise the achievement of recurring
savings and avoid reliance on non-recurring
savings to enhance longer-term financial
sustainability
In progress/Limited progress
The overall extent of progress against this
recommendation is difficult to assess due to a
lack of detail and transparency in reporting on
recurring and non-recurring savings performance
(paragraph 30).
An updated recommendation on savings
performance and transparency is included in this
report.
Ensure that management commentaries are
open and transparent, include a clear link
between budget outturn and the financial
performance in the accounts and report on 
the achievement of planned savings targets
In progress
Our review of 2023/24 management
commentaries found that that most councils
reported outturn against budget with significant
variations explained. However not all councils
provided sufficient information on savings target
achievement.  
An updated recommendation on savings
performance and transparency is included in 
this report.
Provide clear statements about reserves
policy and explicitly set out the purpose
of committed reserves within their
annual accounts. This will enhance the
level of assurance that councils can
provide regarding their ongoing financial
sustainability
Complete / In progress
A review of available councils’ management
commentaries found that key areas of reserves
were clearly identified, with the purpose
explained and the majority identifying a
minimum reserve level. However publication 
of committed reserve information was less 
well evidenced (Case study 1).  
An updated recommendation on greater
transparency of reserves is included in this
report.
Cont.
34Appendix 1
Page 142 of 376

Page 143

Appendix 1 35
Councils should: Progress/ status
Ensure effective and timely consultation
and engagement with communities on the
options that must be considered to achieve
a balanced budget
In progress
Less than half of councils stated, via our data
return, that public consultation was undertaken
when preparing budgets for 2023/24. In our
Local government budgets 2024/25 publication,
24 out of 32 councils stated they undertook
community engagement on financial pressures.
We will follow this up in our budget briefing in
Spring 2025 when we look at councils’ 2025/26
budget setting.
Strengthen their monitoring and reporting
of financial resilience including clearer and
more public-facing use of performance
against financial resilience indicators and
measures. Financial resilience indicators
should be a component of councils’ medium
and longer-term financial plans to provide
assurance that they are balancing short-term
pressures with robust planning for long-
term financial sustainability
In progress
Most councils reported that they assess and
monitor financial sustainability, with financial
indicators used in financial plans, with 17
explicitly using these within their medium- and
long-term financial plans (paragraphs 63 - 67).
An updated recommendation on the use of
financial indicators in monitoring and reporting is
included in this report.
Work with the Scottish Government to 
build momentum and accelerate progress 
in the development of a fiscal framework 
for local government to enhance the clarity
and certainty of budgets for councils in
future years
In progress
We understand that COSLA and the Scottish
Government have been progressing the
development of a fiscal framework
Page 143 of 376

Page 144

Local government in Scotland
Financial bulletin
2023/24
Audit Scotland, 4th Floor, 102 West Port, Edinburgh EH3 9DN
Phone: 0131 625 1500 Email: info@audit.scot
www.audit.scot
ISBN 978 1 915839 60 2
Page 144 of 376

Page 145

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  AA Date 26/02/25 
Strategic Performance Framework - latest performance results for
Legal and Democratic 
From  Archie Aitken, Chief Officer (Legal and Democratic)  
E-mail AitkenA@northlan.gov.uk Telephone 07939 280102 
Executive Summary
Legal and Democratic comprises the following service areas :- 
(1) Democratic & Resources, with a responsibility for governance arrangements,
committees, Members Services, elections, licensing, registration services, the
administration of Children’s Panels, employment law advice, community councils,
serious organised crime issues/ counter terrorism, the civic square complex, and
veterans issues; 
(2) Enterprise, supporting, with legal advice and representation, all contractual,
planning and property matters, together with an advisory and co-ordinating role in
respect of data protection and freedom of information; and 
(3) Litigation, which provides all other legal advice and assistance, and representation
in court proceedings. 
Performance across all of these areas is monitored, as required, at fortnightly extended
management meetings chaired by the Chief Officer. 
As can be seen from the above summary of the Service, significant areas of service
delivery are carried out in support of other Council Services and, accordingly, performance
targets are sometimes not within the sole gift of Legal and Democratic. The indicators set
out in Appendix 1, therefore, focus on those areas where the Service does have control of
performance.
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Reviews the high-level performance overview presented in Appendix 1, and the
supporting data contained within the linked Excel spreadsheet and identify where
further information is required to understand or investigate performance further. 
The Plan for North Lanarkshire
Priority  All priorities
Item 12
Page 145 of 376

Page 146

1. Background 
1.1 There are six inter-related strategic frameworks which are key to
evaluating the success of The Plan for North Lanarkshire and
assessing delivery towards achieving the overall vision by ensuring
each stage is appropriately aligned, planned, guided, implemented,
monitored, and governed.   
1.2 The six frameworks focus on ensuring a corporate one council approach in respect of
Policy, Governance, Performance, Self-Evaluation, Project Management, and
Demonstrating Improved Outcomes for Communities.   
1.3 The Strategic Performance Framework comprises performance measurement at three
levels (as per the diagram on the right).  This aims to collectively provide an overview
of performance to help understand the impact of council activities on improving services
and outcomes for the people and communities of North Lanarkshire.  The measures in
this Framework allow for day to day activities, and progress towards achieving the long-
term vision set out in The Plan for North Lanarkshire, to be regularly monitored,
reported, assessed, and scrutinised.   
1.4 The Strategic Performance Framework is aligned to the Accounts Commission’
Statutory Direction which places a requirement on councils to report a range of
information in terms of (1) improving local services and outcomes, and (2)
demonstrating Best Value.  Key points of note in this respect are that the Accounts
Commission also expect to see: 
(a) A balance in terms of reporting that captures highlights of good performance as
well as areas of performance requiring improvement.
(b) Reporting that is undertaken in a timely manner.
(c) Easy access to performance information for all citizens and communities.
(d) Comparisons of performance (i) over time (e.g. compared to previous years), and
(ii) with others (e.g. other local authorities or the national average (where available
and appropriate). 
The council’s comparative performance in Local Government Benchmarking
Framework (LGBF) indicators can be viewed through the Improvement Service’s online
dashboard: https://www.improvementservice.org.uk/benchmarking/explore-the-data   
1.5 A Performance Reporting Schedule supports the timely submission of a range of
performance information to ensure fully informed review, reporting, scrutiny, and
decision making processes by Elected Members and senior management.  This
Schedule, endorsed by the Audit and Scrutiny Panel in February 2024, includes Chief
Officer’s individual Performance Reviews at Service Committees in line with the
Strategic Performance Framework. 
1.6 This report therefore presents the Finance and Resources Committee with the latest
performance results for Legal and Democratic for Members’ further review and scrutiny. 
2. Strategic Performance Framework 
Finance and Resources Committee responsibilities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Page 146 of 376

Page 147

2.1 In line with the terms of reference outlined in the Scheme of Administration, the Finance
and Resources Committee is responsible for monitoring and reviewing performance
information for the following Ambition Statements from The Plan for North Lanarkshire.   
21.  Continue to identify and access opportunities to leverage additional resources
to support our ambitions.
25.  Ensure intelligent use of data and information to support fully evidence based
decision making and future planning. 
2.2 The high-level performance overview in Appendix 1 presents Members with a summary
of the latest results for each performance indicator within the remit of the Chief Officer
(Legal and Democratic). 
2.3 The information in Appendix 1 comprises the undernoted. Appendix 2 provides
additional context in respect of the council’s approach to the measurement of indicators
and setting of targets. 
• An ideal direction arrow - this indicates whether a higher or lower figure is the
preferred direction of travel.   
• Measurement unit - for example whether the result is a %, a number, a unit cost
(in £), or a ratio.
• Performance results for the most recent financial years (depending on availability
of data) along with the latest year’s target and corresponding RAG status (for
indicators where it is appropriate to set targets).   
• The most recent monthly or quarterly results, along with the corresponding target
and RAG status.  Note the inclusion of this information is dependent on the
measurement frequency of the indicator and availability of data as at the time of
reporting. 
• A trend graph - this captures the direction of travel achieved over the years and
includes the most recent monthly or quarterly results where available.
• Comments - narrative summarising the current position and providing an
explanation for any significant variations in performance.  Where applicable, this
narrative also highlights any internal or external factors impacting on service
delivery as well as any residual effects of the pandemic, e.g. any increase or
decrease in the volume of transactions or enquiries processed. 
2.4 A large volume of data supports the high-level performance overview in Appendix 1. 
This is outlined in the latest performance results for Legal and Democratic Excel
spreadsheet which is available through the following link for Members to carry out a
deep dive and review and scrutinise each performance indicator further.  The Menu on
the second tab of the spreadsheet contains built in hyperlinks that automatically take
the user to a tab for each performance indicator and therefore provides a useful
navigation aid to review the contents of the file.
• Latest performance results for Legal and Democratic.xlsx 
 A higher figure is better
 A lower figure is better
Key to RAG status
Green Performance is on target and/or within acceptable thresholds
Red Performance does not meet target and is outwith acceptable thresholds
Blue Performance surpasses the target and exceeds expectations
Page 147 of 376

Page 148

Current context 
2.5 The Service restructured in April 2024 reducing the number of sections from four to
three; Democratic and Resources, Litigation and Enterprise. The implementation of the
structure is to be finalised, but the Service continues to face pressures on account of
vacancies as a result of a difficulty in recruiting and retaining some posts.  This has
resulted in increased pressures on meeting demand, but all possible and practical steps
are being taken to address this, including increasing resources and introduction of a
case management system.  The Service has implemented efficiencies in service
delivery in Licensing, including streamlining processes and adopting a more digitised
strategy.  This has improved the customer experience and reduced the time that
matters are brought before the Licensing Board and Regulatory Committee for
determination. The Service is continuing to review and implement efficiencies in
Registration both to meet customer demand and in preparation for One Number.   
Recent Performance highlights 
2.6 The Service continues to perform well in the processing of Freedom of Information and
Registration which are assessed by national regulators in the terms of quality and
accuracy of service reports.  These are reported to Committee on an annual basis and
these will continue to be monitored to ensure that each Service area achieves the best
possible performance outcomes.  Given the digitisation of Service areas, consideration
is being given to key performance indicators for both internal clients and external
customers and should meaningful performance information be available, these will be
reported in due course. 
Areas of performance requiring improvement 
2.7 With reference to Appendix 1, the reason for the red status in respect of the increased
cost per hour for legal services is set out in the comments column. In essence, this is
due to a combination of increased staffing costs, due to further national collective
bargaining, together with the associated on-costs. With regards to the hours spent
providing legal services, this figure was revised following a reduction in sickness
absence leading to an increase in the overall staff time recorded. As these are factors
outwith the control of the Service, consideration will be given to an adjustment of the
targets so that these reflect the position going forward. 
The reason for the red status in respect of children’s panel expenses is also set out in
the comment column of Appendix 1. In summary, this was a new indicator for 2023-
2024 and as such the target was set at 100%.  Consideration will also be given to an
adjustment to this target once trends have been established. 
Next steps 
2.8 As noted in paragraph 1.5, the Strategic Performance Framework is supported by a
Performance Reporting Schedule. This sets out the arrangements for service, statutory,
and Strategic Performance Framework reporting to committee. In this respect the
relevant Committee can expect to receive the following in respect of Legal and
Democratic areas of work for 2025 to 2026. 
Report Description Committee Committee
cycle
Freedom of
Information
annual report 
This report provides details of the number of
Freedom of Information (FOI) and Environmental
Information Requests (EIR) received by the
council during the previous financial year and
Finance and
Resources
Committee
Cycle 1 in
2025
Page 148 of 376

Page 149

those completed by the statutory deadlines and
also provides further comparative and ancillary
information.
Latest report in November 2023: link to report 
Registration
service
performance 
This report provides an update on the
performance of the registration service, for the
latest calendar year.  The performance of the
Registration Service provided is monitored
annually by the District Examiners from National
Records of Scotland (NRS).
Note, production of this report relies on the
timely receipt of the respective performance data
from the NRS.
Latest report in May 2024: link to report
Finance and
Resources
Committee
Cycle 2 in
2025
Annual data
protection report 
This reports on the council’s data protection
compliance and activity for the latest financial
year in line with the General Data Protection
Regulation (GDPR) and the Data Protection Act
2018 (DPA) which came into force on 25 May
2018. 
The report is from the council’s Data Protection
Officer (DPO) and provides an update, following
the introduction of the legislation, in relation to
data sharing, breaches, complaints, and training.
Latest report in September 2024: link to report
Finance and
Resources
Committee
Cycle 3 in
2025 
3. Measures of success 
3.1  Measures of success include: 
• Regular oversight and monitoring of performance across the organisation to gain
assurances in terms of governance and accountability.
• Regular review and challenge processes to scrutinise the performance of the
council to ensure effective use of resources and that resources are directed in
accordance with agreed policy and according to priorities, while ensuring sound
decision making and clear accountability for the use of resources in achieving
improved outcomes for service users and the local community.  
• Performance monitoring, management, and reporting arrangements that support
the demonstration of improved performance in local services and outcomes, and
the delivery of Best Value. 
4. Supporting documentation 
Appendix 1 -  High-level performance overview. 
Appendix 2 - Note for information in respect of performance indicators and targets. 
Archie Aitken
Chief Officer (Legal and Democratic) 
Page 149 of 376

Page 150

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
Page 150 of 376

Page 151

5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐     
Page 151 of 376

Page 152

Appendix 1
Legal and Democratic
High-level performance overview - as at October 2024 
Page 152 of 376

Page 153

Page 153 of 376

Page 154

Appendix 2 
Note for information in respect of performance indicators and targets 
It should be noted that the nature of particular areas of service being measured in order to assess and manage performance do not
always lend themselves to a traditional approach to either measuring performance or setting targets, for example: 
• Some indicators (and targets) are required to monitor performance against a commitment or minimum standard the council has made in
advance to achieve a stated level of performance when delivering a service. 
• Some indicators (and targets) are required to assess compliance with legislative requirements.
• Some targets represent the level of performance that the council aims to achieve from a particular activity in either the short, medium, or
long-term.
• Some indicators are needed to help present a complete picture of performance in the round, as a single performance indicator used in
isolation rarely tells the whole performance story and a range of indicators are required to reflect the economic, efficient, and effective
aspects of demonstrating best value. 
• Some indicators and targets can help to support accountability to the public in terms of demonstrating best value and an efficient and
effective approach to the delivery of services. 
• Some indicators are monitored to ensure the council complies with specific requirements, such as information governance or health and
safety.
• Some indicators are monitored to provide added context in order to help interpret performance results or supplement other existing
measures. Information such as this can be critical to enhance knowledge and decision making in terms of demand to help determine
priorities and allocate resources. 
• For some indicators it is not appropriate to set targets as it is the trend in the data (i.e. the direction of travel) that provides more meaningful
information to allow for an assessment in relation to whether performance has improved.
• Some indicators are national benchmarking indicators where their purpose is to allow for comparisons with other councils and the national
average.  These benchmarks are, in essence, can openers designed to focus questions on why variations in cost and performance are
occurring between similar councils.
• Some indicators are proxy measures, particularly in the case of measuring outcomes, as without directly measurable data for a desired
outcome the only alternative is to use a proxy that is an indirect measure of the desired outcome but which is itself strongly correlated to that
outcome. 
Page 154 of 376

Page 155

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    KH/GR/JG Date 26/02/25 
Digital North Lanarkshire Programme of Work – Performance
Optimisation: Innovation Fund 
From  Katrina Hassell, Chief Officer (Business and Digital)  
E-mail HassellK@northlan.gov.uk Telephone 07903 096121 
Executive Summary
This report provides an overview of how Services can access the Innovation Fund, an
approved deliverable of the Strategic Capital Investment Programme 2024/25 to 2028/29, to
support service transformation to aid achievement of the longer-term vision outlined within
The Plan for North Lanarkshire. 
The Innovation Fund is a key aspect of the Digital North Lanarkshire Programme of Work.
This report describes how the Innovation Fund will be managed and governed and includes
details of progress to date from the Performance Optimisation subgroup of the Digital North
Lanarkshire Programme of Work.
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the contents of the report;
(2) Support the approach to accessing the Innovation Fund 
(3) Acknowledge that use of the Fund is aligned to the six principles contained within
the Digital and IT Strategy (2024-2027)
(4) Endorse the next steps. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (24) Review and design services around people, communities,
and shared resources
Programme of Work All Programmes of Work
Item 13
Page 155 of 376

Page 156

1. Background 
1.1 Members are aware of the Programme of Work (PoW) to 2028 to support the delivery
of The Plan for North Lanarkshire and the reporting requirements contained therein. 
1.2 Digital North Lanarkshire is one of seven priorities contained within the POW to 2028.
It is a key enabler for the wider PoW, and aims to develop a skilled digital workforce,
promote an innovative, sustainable culture, and be the digital leader for a transformed
North Lanarkshire.   
1.3 The Digital North Lanarkshire PoW Board consists of 4 sub-groups: (a) Digital Culture,
Leadership and Knowledge; (b) Digital First Operations; (c) Improved Customer
Experience and (d) Performance Optimisation. This report is focussed on the
Performance Optimisation sub-group, which has responsibility for delivering the
following key deliverables: 
Activity
No.
Overview
1 Develop an efficient digital and IT cost model to ensure scarce financial
resources are aligned to vital enabling technologies.
2
Enhance security monitoring to maintain effective access and control
over council data as the Council delivers the anticipated increase in its
digital footprint. 
1.4 This report provides Committee with an update on the progress of a key aspect of
Activity 2 above. 
2. Report 
2.1 Members are aware of the Strategic Capital Investment Programme 2024/25 to
2028/29 and the agreed Capital Bid process used to allocate/award funds to key
projects and deliverables. 
2.2 Through the Capital bid process, Business and Digital’s request to create an innovation
fund was approved. This fund, managed by Business & Digital on behalf of all services,
supports the deliverable noted at paragraph 1.3 above, and mitigates against risk
RIA0000414 - Insufficient ICT Investment. The bid also recognised the potential
capability to positively impact all POW themes in utilising technology. 
2.3 Technology marketplace evolves extremely quickly with new solutions not considered
during the Capital bid process leaving the organisation without the ability to react and
benefit from those solutions. Furthermore, new solutions could provide the ability for
Services to adopt/trial technology to respond to the demand of financial savings. 
2.4 During the Capital Bid process, Business and Digital’s capital requests were allocated
to meet the needs of five themes:
• Line of Business
• End User Device
• Digitisation
• Cyber Security
• Innovation 
2.5 Of bids submitted council wide for consideration, only one was categorised as within
the Innovation theme which demonstrates the lack of innovation presently being
Page 156 of 376

Page 157

planned council-wide. The fund will aid in the identification and adoption of operational
innovation development. 
Management and governance 
2.6 The Capital bid request for the fund was successful in securing £500k to be utilised
over the course of the Strategic Capital Investment Programme 2024/25 to 2028/29 as
follows:   
2.7 As digital transformation across the Council and its communities is underpinned by the
Digital and IT Strategy (2024-2027) and the six principles set out in the strategy, the 
service has linked the Innovation Fund to these six principles, providing a logical
governance structure to manage the bidding and application of the fund. 
2.8 The following provides an overview of the eligibility/application/criteria etc.  
ELIGIBILITY – to be eligible to access the fund Services will apply with the intention of
match funding depending on the value/cost of the request. This will be at various levels
of match funding and in line with the value of the fund available in year. 
CRITERIA – this will be based on weightings associated with the six principles noted
at 2.7 above. 
APPLICATION – will be via a lite version of the recognised Business & Digital
Engagement process and approved via the Enterprise Architecture Governance Group
and Technical Design Authority where required. 
RESOURCE – the Service will commit to the required resource to lead the project or
Workpackage with Business & Digital providing the technical/development resource
where appropriate. 
REPORTING – should align with the recognised Project Management Framework and
include progress reports to the relevant Programme of Work to include details of
planned spend along with progress/outlook details. 
YEAR 1
£100k
YEAR 2
£150k
YEAR 3
£150k
YEAR 4
£50k
YEAR 5
£50k £500k
Page 157 of 376

Page 158

This overview was presented to the Enterprise Architecture Governance Group on the
30th of October 2024 for approval and members agreed with the approach. 
Next steps 
2.9 Agree eligibility levels and criteria set out above at paragraph 2.7 and develop
communications to promote the Innovation Fund and application process with a view
to launching early in January or February 2025. 
2.10 Reprofiling the fund values as a result of lack of requests in year and expectation that
Services have profiled savings into years 2 and 3 of the current savings cycle: 
3. Measures of success 
3.1 Success will be measured through the set of performance indicators agreed at the
Digital North Lanarkshire PoW Board: 
a) Technology maintenance costs - % change in costs (in terms of current
expenditure)
b) Digitisation and innovation costs - % change in costs
c) Self-service - % increase in self-serve interactions
d) Automated services - % of service processes automated/digitised 
3.2 Performance indicator definitions are complete, and methods of data gathering are
currently being investigated.     
4. Supporting documentation 
N/A 
Katrina Hassell
Chief Officer (Business and Digital) 
YEAR 1
£20k
YEAR 2
£230k
YEAR 3
£150k
YEAR 4
£50k
YEAR 5
£50k £500k
Page 158 of 376

Page 159

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
Paragraph 2.6 above details the Innovation Fund approved within the Strategic Capital
Investment Programme. Paragraph 2.4 confirms the fund is expected to aid in
identifying and adopting operational innovation development to support these essential
changes. 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 159 of 376

Page 160

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Digital North Lanarkshire Programme envisages significant changes to
applications, software, hardware, and connectivity, with all duly considered for
security, compliance, Digital First and Enterprise Architecture perspectives through the
key governance groups of the Enterprise Architecture Governance Group (EAGG) and
Data Governance Board (DGB). Paragraph 2.4 above confirms this fund is expected
to aid in identifying and adopting operational innovation development to support these
essential changes. 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☒ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service or
Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the Armed
Forces community to make sure that they do not face disadvantage compared to other
citizens in the provision of public services. 
Page 160 of 376

Page 161

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the age
of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from
the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 161 of 376

Page 162

Page 162 of 376

Page 163

North Lanarkshire Council
Report
Finance and Resources Committee  
☐approval ☒noting Ref KH/RL/DGB Date 26/02/25  
Senior Information Risk Owner (SIRO) – Information Governance –
Assurance and Performance Report 2024 
From  Katrina Hassell, Chief Officer (Business & Digital)  
Email  HassellK@northlan.gov.uk   Telephone   07903 096 121 
1. Background 
1.1 There are several officers and teams across the Council with responsibility for information
governance and information security, but good information governance involves everyone. This
report describes how these roles collectively ensure organisational compliance with the
legislative and regulatory requirements relating to the handling and processing of information.
Executive Summary
This Senior Information Risk Owner (SIRO) report aims to provide assurances that information risks are
being effectively managed to ultimately enable the Council to comply with legislative requirements and
good practice. 
It summarises the Data Governance Board’s (DGB) oversight of information governance arrangements
for the period January to December 2024 and provides the SIRO’s assessment of the Council’s existing
information governance and data accuracy arrangements. This report therefore outlines what is going
well, highlights key matters of concern, and details the improvement actions which are required to be
progressed – through the Data Management Team (DMT) – during 2025 to strengthen the Council’s
information governance arrangements. 
Recommendations 
It is recommended the Finance and Resources Committee: 
(1) Acknowledge the activities which have been undertaken and/or are underway to enable the SIRO
to provide assurance in respect of the Council’s information governance.
(2) Endorse the areas of improvement which the SIRO has included within the live improvement
plan for 2025.
(3) Recognise that progression of the Digital North Lanarkshire Programme of Work deliverable of
‘ensure useful, secure, compliant and digital first applications are available to support critical but
streamlined service delivery’ creates scope to significantly improve the Council’s information
governance and information security arrangements. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement 
Item 14
Page 163 of 376

Page 164

1.2 As corporate champion for information governance, the SIRO aims to provide the Corporate
Management Team and Finance and Resources Committee with assurances that information
risks are being effectively managed. To this end, this report outlines information governance
activity and performance in respect of the period January to December 2024. It provides the
SIRO’s assessment of existing arrangements, detailing what is going well, key matters of
concern, and areas requiring further improvement and effort.   
2. Report 
2.1. The Council has always been committed to effective information governance with sound
arrangements for ensuring compliance with legislation and recognised best practice
appropriately managed as part of the Council’s risk management and corporate governance
arrangements. 
2.2. The Chief Officer (Business and Digital) within the Chief Executive Office is presently the
Council’s Senior Information Risk Officer (SIRO), but following consideration of ‘One Place,
One Plan – Governance Update’ report at Policy and Strategy Committee in September 2024,
this responsibility will transfer to the Chief Officer (Legal and Democratic Services) during
2025. 
2.3. SIRO responsibilities include:
a) Leadership and overall ownership of the Council’s Corporate Governance Action Plan,
acting as corporate champion for information governance.
b) Acting as Executive Sponsor and advocate for the management of information
governance at a senior level.
c) Providing advice and reports in respect of information incidents and risks, including the
content of the council’s Annual Governance Statement relating to information risk.
d) Owning the management of information governance and associated risk assessment
processes within the Council.
e) Understanding how the strategic priorities of the Council may be impacted by
information governance risks, and how these risks need to be managed including the
adequacy of resources and levels of independent scrutiny. 
2.4. Previous SIRO reports confirmed the Council operates effective information governance
management arrangements, having undertaken and delivered significant technical and
process improvements over recent years. Following on from the change implemented during
2023-2024, this annual SIRO report relates to the calendar year 2024, and therefore provides
elected members with an up-to-date snapshot of current information governance management
arrangements. 
2.5. Sections 14 to 52 of the SIRO report provided as Appendix 1 detail performance and activity
undertaken over the reporting period to ensure personal data is held securely, and information
disseminated effectively. Key highlights for Committee consideration include: 
➢ Information Security and Information Governance corporate risk monitored in
accordance with residual risk ratings, with corresponding mitigating actions identified
and deployed. (section 14 to 19)
➢ Reported data breaches are comparable with calendar year 2023, with improvements
evident in the number of breaches reported to Legal Services within the required 72
hours. A higher percentage of breaches met the threshold for reporting to the
Information Commissioner’s Office (ICO), but the ICO did not apply any enforcement
action or fines in respect of these. (section 20 to 27)
➢ The Council continues to follow published National Cyber Security Centre (NCSC)
guidance, with several activities undertaken to mitigate against potential cyber security
threats, including maintaining compliance with Public Sector Network (PSN) and Page 164 of 376

Page 165

Payment Card Industry Data Security Standard (PCI DSS) requirements, fully
deploying protection, preventative and detective tools, further developing information
security standards, and transitioning all critical products to more secure and modern
cloud-hosted solutions. (section 28 to 36)
➢ A re-assessment of the Council’s Data Maturity Score during 2024 confirmed that
delivery of improvement actions over recent years has resulted in the Council’s maturity
score improving from +1 (Initial/Basic) to -3 (Developing), an excellent achievement
given the benchmark score for similar organisations is 2+ (Basic). (section 37 to 40)
➢ Increased oversight and monitoring of mandatory training activity has resulted in
compliance levels vastly improving; for example, non-compliance as at 7th December
for the Data Protection Essentials module ranges from only 2% for Chief Executives to
16% for Adult Health and Social Care. Members should note that non-compliance
between 0% and 20% is RAG rated as Green. (section 41 to 48)
➢ Continued delivery of actions agreed with the Keeper of the Records of Scotland in
respect of File Plan, Destruction Arrangements, Vital Records and Audit Trail. (section
49 to 52) 
2.6. Complementing the Corporate Data Protection Officer’s annual reports to the Finance and
Resources Committee, sections 20 to 27 of the SIRO report, and Annexe B of the Appendix
provide Committee with further details regarding data breaches identified during this reporting
period, and the guidance and remedial actions applied following their assessment. 
2.7. Sections 28 to 36 focus specifically on ICT Security and Cyber risks. These highlight the scale
of the cyber security threat now facing all organisations and detail activities undertaken through
Business and Digital to maintain a positive information governance assurance and mitigate
against potential cyber risks. Paragraph 35 confirms that the Council was not affected directly
by any notable cyber incidents during this reporting period. 
2.8. Paragraphs 31(a), 33, 34 and 36 emphasise that addressing high-risk vulnerabilities in ageing
critical systems is considered a key priority for 2025, with paragraph 58 confirming that actions
are identified and largely underway through the approved Digital North Lanarkshire
Programme of Work and capital investment programme to address this growing risk. 
Next steps 
2.9. The Council is committed to a clear strategy and sustainable framework for information
governance and security, and effective data and information management governance is an
essential component of that.  Given this report presents information assurance for the 2024
calendar year, the live improvement plan detailed in section 54 of the Appendix highlights
activity planned from January 2025 to strengthen existing arrangements. 
2.10. By way of summary, the key priorities identified within the improvement plan include:
a. Raise the profile and prioritisation of Data Protection responsibilities.
b. Refresh and strengthen approach to mitigating cyber security risks and vulnerabilities.
c. Iterative deployment of the Data Governance Board approved workplan (Annex E). 
d. Enhanced implementation of the Council’s strategic approach to data and information
management in line with the Programme of Work to 2028. 
2.11 Improvements can always be made to our information governance arrangements, and with a
residual risk score of 20 (October 2024) prevalent in respect of our Information Governance
and Information Security corporate risk, it is essential this subject matter remains as a high
priority improvement area for the Council. Progress against these key next steps will be
managed by the DGB, who will look to further develop policies, guidance, standards,
processes, and approaches as appropriate to improve awareness, understanding and
compliance with legislative requirements and good practice.  Page 165 of 376

Page 166

3.  Measures of success 
3.1 Effective Information Security and Information Governance assists the Council in protecting
itself from cyber-attacks and security breaches, which can both give rise to service delivery
and financial pressures. Measures of success therefore flow from demonstrated and
continued compliance with all information governance legislative and regulatory
requirements. 
4. Supporting documents 
4.1 Appendix 1 – SIRO Information governance – assurance & performance – January to
December 2024 Report. 
Katrina Hassell
Chief Officer (Business & Digital) 
Page 166 of 376

Page 167

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?   
If Yes, has an assessment been carried out and published on the council’s website? 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
There are no immediate financial implications arising from this report; however, the
promotion and implementation of effective information governance impacts positively on
the Council’s ability to mitigate its exposure to financial risk, particularly monetary
penalties levied by the Information Commissioner's Office for non-compliance.
Notwithstanding this, sections 31(a), 33, 34, 36, 54(b), and 58 of the SIRO report so
appended illustrate action is required through available capital resources to ensure
continued achievement with PSN accreditation and compliance with good practice
standards.
If Yes, have all relevant financial impacts have been discussed and agreed with
Financial Solutions? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People and
Organisational Development? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
Section 4 of the SIRO report as appended outlines the legislative and regulatory
requirements placed on the Council in respect of information processing, security, and
management. General Data Protection Regulations (GDPR) continue to apply to the
United Kingdom post-Brexit implementation. 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal and
Democratic Solutions? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? Page 167 of 376

Page 168

5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data?   
Yes ☒ No ☐ 
Section 4 of the SIRO report as appended outlines the legislative and regulatory
requirements placed on the Council in respect of information processing, security, and
management. General Data Protection Regulations (GDPR) continue to apply to the
United Kingdom post-Brexit implementation.  Paragraphs 20 to 27 also highlight any
breaches of confidentiality and security considered by the DGB during the 2024 reporting
period, with corresponding remedial actions identified.
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☒  
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Sections 28 to 36 of the SIRO report focus specifically on ICT Security and Cyber risks.
Paragraph 30(c) provides context regarding the council’s complex technology network,
with paragraph 29 further highlighting the scale of the cyber security threat facing this
complex network. The Digital North Lanarkshire Programme of Work creates scope to
appropriately modernise and rationalise the Council’s network, with resources prioritised
in accordance with the risk assessments summarised within Annex C of the Appendix. 
As referenced in paragraphs 2.8 and 5.2 above, addressing high-risk vulnerabilities in
ageing critical systems is considered a key priority for 2025 to ensure the Council can
maintain its PSN accreditation longer-term. 
All changes required to maintain effective information governance and security will be
considered by the appropriate corporate working group, with any technology components
fully assessed when required by the corporate Enterprise Architecture Governance
Group.   
Where the impact identifies a requirement for technology, has an assessment been
carried out (or scheduled) by the Enterprise Architecture Governance Group (EAGG)? 
Yes ☒ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?  Page 168 of 376

Page 169

5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
Sections 6 and 54(a) of the SIRO report highlight that everyone – staff and elected
members – must understand the importance of information governance and security.
The live improvement plan continues to highlight a requirement for ongoing
communication of requirements.
5.9 Risk impact
Is there a risk impact?
Yes ☒ No ☐
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g., Corporate or Service or
Project Risk Registers), and how they are managed?
In line with the Council’s corporate risk management arrangements and a requirement
for risk to be managed at an appropriate level of the organisation, the Chief Officer
(Business & Digital) presently has lead officer responsibility for the corporate risk
regarding Information Security and Information Governance. Approved risk management
arrangements further require the assessment, monitoring, and review of individual risks
to be assigned to relevant Corporate Working Groups, and this particular risk sits within
the remit of the DGB. 
The scale of the cyber security threat now facing all organisations sees the residual risk
assessment of this corporate risk being retained at 20 “almost certain” likelihood (5) and
“major” impact (4), with the likelihood of a breach considered high.   
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.,
does it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)?
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens
in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or
on a specific group of these?
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from
the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒  Page 169 of 376

Page 170

Appendix One 
SENIOR INFORMATION RISK
OWNER (SIRO)
INFORMATION GOVERNANCE – ASSURANCE &
PERFORMANCE: JANUARY TO DECEMBER REPORT
NORTH LANARKSHIRE COUNCIL December 2024 Page 170 of 376

Page 171

9 
Table of Contents
EXECUTIVE SUMMARY ..................................................................................................................... 9
INTRODUCTION ................................................................................................................................ 10
Key Roles and Responsibilities ....................................................................................................... 10
Governance and Monitoring Arrangements .................................................................................... 12
RISK MANAGEMENT AND ASSURANCE ....................................................................................... 13
COMPLIANCE WITH DATA PROTECTION AND GDPR REQUIREMENTS .................................... 15
ICT SECURITY AND CYBER RISKS ................................................................................................ 17
CORPORATE GOVERNANCE ACTIVITY ........................................................................................ 21
LIVE IMPROVEMENT PLAN ............................................................................................................. 26
CONCLUSION ................................................................................................................................... 28
Appendix Annexes: -
A – Data Governance Board Terms of Reference ……………………………………………….. 29
B – Information Commissioner Office Guidance …………………………………………………. 32
C – Risk Assessment Summary …………………………………………………………………… 33
D – Data Maturity Assessment …………………………………………………………………….. 35
E – Data Governance Board Roadmap/Workplan ………………………………………………. 36 
EXECUTIVE SUMMARY
This report provides an update relating to the responsibilities of North Lanarkshire
Council’s Senior Information Risk Owner (SIRO). It outlines activity and performance
related to information governance and provides assurances that information risks are
being effectively managed. It outlines what is going well, any matters of concern, status of
approved improvement actions, also indicating where further improvements can be made.
This report relates to the period January to December 2024. 
Page 171 of 376

Page 172

10 
INTRODUCTION
1. The Senior Information Risk Owner (SIRO) Report reflects on the Council’s information governance
work, aiming to provide assurances that personal data is held securely, and information disseminated
effectively. This report focuses on the period January to December 2024. 
2. The Council continues to be committed to effective information governance, with sound arrangements
in place to ensure compliance with legislation and recognised best practice. Governance
arrangements are closely monitored to ensure systems, policies and procedures are fit for purpose,
and that all staff and elected members understand the importance of information governance and
security, with good practice considered everyone’s business. 
3. ICT security and cyber risks present an ever-increasing challenge to all organisations and the Council
is no different. Arrangements to manage these risks, in consideration of the threat landscape, are
contained within the report, with a summary included to highlight action underway and planned to
maintain and strengthen defences and enhance corporate resilience. 
4. Specifically, this report: 
a. Documents organisational compliance with the legislative and regulatory requirements relating to
the handling and processing of information and provides assurance of ongoing improvements to
manage information risks. This includes the Council’s consideration and performance relating to: 
➢ Data Protection Act 2018 and General Data Protection Regulations (GDPR) 2016
➢ Public Records (Scotland) Act 2011, and
➢ Information Security Standard ISO/IEC 27001:2013
➢ Managing data in line with the CIPFA Delivering good governance in local government
framework 
b. Provides an overview of Council governance arrangements and key roles and responsibilities. 
c. Outlines any serious incidents which required investigation over the duration of this report, relating
to any losses of personal data or breaches of confidentiality.  
Key Roles and Responsibilities 
5. The Chief Officer (Business and Digital) within the Chief Executive Office is presently the Council’s
Senior Information Risk Officer, but following consideration of ‘One Place, One Plan – Governance
Update’ report at Policy and Strategy Committee in September 2024, this responsibility will transfer
to the Chief Officer (Legal and Democratic Services) during 2025. Key responsibilities include: 
a. Leadership and overall ownership of the Council’s Corporate Governance Action Plan, acting
as corporate champion for information governance.
b. Acting as Executive Sponsor and advocate for the management of information governance at
a senior level.
c. Providing advice and reports in respect of information incidents and risks, including the content
of the council’s Annual Governance Statement relating to information risk.
d. Owning the management of information governance and associated risk assessment
processes within the Council.
e. Understanding how the strategic priorities of the Council may be impacted by information
governance risks, and how these risks need to be managed including the adequacy of
resources and levels of independent scrutiny.  Page 172 of 376

Page 173

11 
6. There are several officers and teams across the Council that have professional expertise relating to
information governance and information security, but good information governance involves
everyone. All staff and elected members therefore have personal responsibility to ensure information
and data is held securely, processes appropriately and safely destroyed when not required. 
7. Diagram 1 below illustrates existing responsibilities and governance arrangements in respect of
information governance, clearly highlighting the differing responsibilities of the SIRO, Data Protection
Officer, and Records Manager, as well as the oversight responsibilities of the strategic Data
Governance Board (DGB) and operational Data Management Team (DMT). 
Diagram 1 
8. Recognising these wider responsibilities, this report complements two annual reports prepared by the
Chief Officer (Legal and Democratic Solutions) – the Corporate Data Protection Officer (DPO). The
first report in respect of detailed 2023-24 responsibility for data sharing, data breaches, Information
Commissioner Office (ICO) complaints was considered by the Finance & Resources Committee in
September 2024. The second report detailing Freedom of Information (FOI) and Environmental
Information Requests (EIR) for financial year 2023-24 is reported separately on today’s agenda. This
annual SIRO report provides additional context regarding data breaches, with details provided up to
end of November 2024.
Page 173 of 376

Page 174

12 
Governance and Monitoring Arrangements 
9. The Council’s Data Governance Board (DBG) is responsible for developing and implementing
strategies, policies, and standards in relation to data governance and management.  Additionally,
the board is responsible for directing improvements identified in line with the data requirements of
the council and its Programme of Work for 2023- 2028 and the DGB workplan (updated following
the refresh, reframe, responsibilities review referenced in section 11 below), and for ensuring
measures are in place, through the Data Management Team, to monitor compliance with approved
policies and standards. 
10. The DGB is presently chaired by the SIRO, includes the Corporate Records Manager, Data
Protection Officer (DPO), the Strategy and Performance Manager, Chair of the Data Management
Team (DMT) and key representation from all Council functions. 
11. Although annual SIRO reports to date confirmed governance arrangements operate effectively,
several changes in structures and personnel necessitated a review of the Terms of Reference,
overarching Data Custodian Model and associated operating practices. The review took place
between May and December 2024, with the DGB approving revised Terms of Reference in
October 2024. 
12. The primary remit of the DGB remains unchanged, but Board responsibilities are now categorised
as (a) Approach, (b) Deployment and (c) Assessment and Review. The revised Terms, attached
as Annex A, are briefly summarised as follows, with Board agendas constructed to enable officers
to meet these responsibilities: 
a. Approach
➢ Achieve and maintain legislative, regulatory and corporate governance
requirements
➢ Ensure appropriate standards and policies are developed, in place and regularly
monitored
➢ Ensure data governance remains aligned to other corporate strategies, policies
and plans, particularly the Digital and IT Strategy and key data principle.
b. Deployment
➢ Promote data governance and associated good practice across the Council and
arms-length external organisations
➢ Ensure all members of the DGB and DMT understand their roles and
responsibilities, and are sufficiently trained to discharge such requirements
➢ Monitor the provision and uptake of training provided to support effective data and
information governance
c. Assessment and Review
➢ Receive and consider reports into breaches of confidentiality and security
➢ Support the preparation of required reports, including but not limited to, the annual
SIRO report, annual Data Protection report and scheduled Internal Audit reports
➢ Review and update progress against identified audit and improvement actions
➢ Schedule and undertake Data Quality and Information Governance risk
assessments
➢ Develop and examine performance measures that assess effectiveness and
compliance
➢ Review movement on the Data Maturity Curve, ensuring planned activity continues
to move the Council towards the targeted ‘advancing’ stage.    Page 174 of 376

Page 175

13 
RISK MANAGEMENT AND ASSURANCE
14. The Council’s Corporate Risk Register includes a risk in respect of Information Security and
Information Governance. This risk is defined as “There is a risk that Information; in whatever
format; is not managed securely or that Information Governance across the Council and its
ALEOs/partners is ineffective.  This includes implementation of enhanced controls to meet the
evolving working practices of the council such as the significant shift to home and hybrid
working”. 
15. The council identifies and monitors significant risk to its operations.  The Information Security
and Information Governance risk is assessed and monitored using the standard council-
approved process for risk management.  The inherent score of this risk is 25, having been
assessed at the maximum score of 5 for both likelihood and impact. 
16. The agreed approach to the management of key corporate risks sees all risks allocated to a
member of CMT and a Corporate Working Group, with such responsible for assessing,
monitoring, and reviewing in accordance with residual risk ratings. This particular risk is aligned
to the Data Governance Board (DGB) with the Chief Officer (Business and Digital) presently
identified as the Corporate Risk Lead. 
17. The Corporate Risk Register (CRR) 2024-25 was approved by the Audit and Scrutiny Panel in
August 2024, with the Panel considering the latest status of the CRR in October 2024. Both
reports confirm that Information Governance and Information Security remains as a corporate
risk given the impacts which breached, inaccurate or lost data could have on the Council
achieving its priorities and stated objectives. Furthermore, in both reports, the Information
Governance and Information Security Risk is evaluated as ‘high’ risk, carrying a residual risk
assessment of 20 “almost certain” likelihood (5) and “major” impact (4). This risk was monitored
regularly throughout calendar year 2024 but was not one of the corporate risks subject to formal
reporting to the Corporate Management Team and Audit & Scrutiny Panel. As in previous years,
formal reporting will be scheduled in accordance with the timelines identified by the Chief Officer
(Audit and Risk). 
18. The DGB most recently reviewed this corporate risk at its meeting of 4th December 2024,
confirming the following security and governance controls remain in place to manage cyber and
information risk. 
Control (C) /
Action (A)
Description
CON0000233 The framework of information governance policies supporting the council and the
Digital and IT Strategy (i.e. Data Protection Policy, Payment Card Data Security
Policy, Information Security Policy, Acceptable Use of IT Policy (and guidance),
Records and Information Management Policy, and Records Management Plan) are
well established in terms of  ensuring the council has a suite of information governance
policies to ensure that the council’s approach to data is effective and compliant in
relation to data governance and the arrangements required to ensure effective
arrangements are in place for the safe and secure collection, storage, use, and
sharing of data, including processes to safeguard personal data and support data
quality.   
13. These Terms of Reference will continue to be reviewed annually to ensure they facilitate ongoing
legislative and regulatory compliance and enable the Board to effectively support the Council’s
business needs.   
Page 175 of 376

Page 176

14 
Control (C) /
Action (A)
Description
CON0000233 Governed by the Data Governance Board, all policies (except the Records
Management Plan) are reviewed every two years.  In respect of the Records
Management Plan, the council is not the keeper of this, and the council are informed
when they are required to update this.  In the meantime, the council does undertake
an interim internal review each year
ACT0001320 Review of the above, carried out on a biennial frequency, completed during 2023. 
Next reviews are on the DGB workplan and scheduled to be undertaken during 2025.
CON0001064 Secured Premises with secure storage and monitoring of security arrangements.
CON0001477
Corporate Records’ Stores protected with CCTV, Disaster Recovery Plan, Fire
Evacuation Plan, security checks during building closures, fire and intruder alarms,
fire doors, shelving in accordance with BSI guidelines, pest monitoring, temperature
and humidity monitoring, boxing of all records, archival enclosures for records,
reduction of UV light.
CON0002051 A one council approach to data and information management is in place through the
roadmap developed in September 2020. 
ACT0001310
This risk is currently being enhanced in line with the Programme of Work to 2028 to
better unlock the potential of data to support delivery of The Plan for North Lanarkshire
by ensuring an accessible and single source approach to data that supports the
organisation by providing insights and evidence that support decision making,
planning, delivery, and continuous improvement as well as public reporting and
transparency.  This will incorporate all related aspects of data, including governance,
quality, data maturity, spatial mapping, open data, and the supporting architecture and
technology tools.
CON0002060
PROTECTIVE technical cyber security controls in place such as device authentication
checks, multi-factor authentication, network segmentation, web gateways, email
filtering solutions, etc. 
ACT0001050 Conditional Access programme revised in December 2024, and approved by BMT,
will be rolled out during 2025 as part of Windows 11 deployment.
CON0002061
DETECTIVE cyber security technical controls in place such as a security event and
incident management, intrusion detection, and malware detection solutions, ongoing
penetration testing, etc.
ACT00001051 Testing (by a non-Council organisation) of ICT security controls undertaken with
findings reported to UK HMG Cabinet Office for independent evaluation.
CON0002062 RESPONSIVE cyber security technical controls in place inc. malware containment
and recovery tooling.
ACT0000913 Arrangement entered with an experienced cyber incident response partner.
CON0002070 Register of Data Processing Agreements, Data Sharing Agreements and Data
Protection Impact Assessments is in place. Improvements being undertaken through
a corporate data protection review.
19. Over the course of 2024 further enhancements to the Council’s information security governance
and technical cyber security control suite were commenced and/or implemented. A programme
commenced to create a structured suite of information security standards which will govern the
Council’s security posture moving forward. Email continues to be a source of unintended
information leakage, and the Council has now procured product that aims to reduce the
frequency of this occurring. Third-party cyber risk management is an increasingly important
consideration for organisations of all sizes, and enhancements to existing processes are in flight
which will improve the arrangements in place for assuring third parties in their use of Council
data or connectivity to Council systems.  Page 176 of 376

Page 177

15 
COMPLIANCE WITH DATA PROTECTION AND GDPR
REQUIREMENTS
20. UK GDPR and the Data Protection Act 2018 categorise the Council as a Data Controller, with
the DPO tasked with ensuring compliance with all associated data protection arrangements.  
Responsibilities include maintaining relevant policies, monitoring compliance with such, raising
awareness of those policies and ensuring relevant training is provided to all staff to enable the
Council to satisfy its legal obligations. Since May 2018, the Council has also had a legal
obligation to undertake Data Protection Impact Assessments (DPIA) when processing personal
data. 
21. This section of the report highlights any breaches of confidentiality and security considered by
the DGB between January and December 2024, alongside assessment of the remedial actions
identified. Once considered and agreed, remedial actions are subsequently cascaded council
wide through the Data Management Team (DMT). 
22. Over and above the Data Protection Officer’s annual report, the Chief Officer (Business and
Digital Solutions) includes a summary of breaches and near misses within the service’s six-
monthly reporting to the Finance & Resources Committee. Details (up to July 2024) were most
recently provided in September 2024. 
23.  For the reporting period in question (to November 2024), the Council recorded and
investigated 102 data breaches, with 82 (80%) reported to Legal Services as required within
72 hours, and eight reported to the Information Commissioner’s Office (ICO). Comparable
figures for the 2023 calendar year are 109 breaches, with 61 (56%) reported within 72 hours,
and two formally reported to the ICO. At first glance, the level of breaches is very similar,
indicating good information management awareness and reporting. However, given breaches
meeting the threshold for reporting to the ICO increased, there is concern that an increasing
risk to the rights and freedoms of individuals could lead to personal information falling into the
wrong hands. 
24. Members are aware that information governance training has been an identified area of
improvement activity over the last few years. Paragraphs 41 to 48 below demonstrate that the
strengthened arrangements and increased oversight, monitoring and focus have led to
significantly higher numbers of in scope employees competing their mandatory training, and
so evidencing a greater understanding of requirements. Scope remains however to improve
upon timely reporting of personal data breaches and ‘near misses’ to Legal Services within 72
hours of incidents occurring. The DPO has revised the breach reporting form, issued
accompanying guidance, and established a new internal ’24 hours’ deadline to assist in
improving ICO reporting compliance. 
25. Chart 1 overleaf compares recorded breaches from January 2019 to December 2024. The high
volumes recorded in August and December 2023, and June 2024 follow targeted action by
services to complete employee mandatory training requirements, satisfying the previously
approved improvement action.
Page 177 of 376

Page 178

16 
Chart 1 
26. Chart 2 below, which analyses these details by service, indicates good correlation between
completion of mandatory training and levels of reportable breaches. With services continuing
to formally identify and report potential breaches, the Council has scope to act quickly to
recover and/or prevent personal information from falling into the wrong hands.   
Chart 2 
27. Categories of breaches include wrongful disclosure of data, device/documents left in insecure
locations, unauthorised system/app use and failure to redact data. Per the DPO’s Annual
Data Protection reports, there was no enforcement action or fines applied by the ICO in
respect of these breaches, but various recommendations were made. These are highlighted
within Annex B, and include exercising caution with populated forms, ensuring information is
fully removed from laptops being repurposed, reviewing the use of the scheduling assistant,
and reviewing the security and procedures surrounding the issue of correspondence by
services which include customer details. DGB discussions confirmed learning actions were
appropriately documented, with all recommendations subsequently included within the action
plans of both DGB and DMT.
11 10
24
21 21 21
18
21 23
26
42
39
11 10
24
21 21 21
8 10 12 14
23 21
0
5
10
15
20
25
30
35
40
45
2019 2020 2021 2022 2023 2024 ytd
number of breaches - by service
Chief Executive's Office Education and Families
Enterprise and Communities Adult Health and Social Care
Page 178 of 376

Page 179

17 
ICT SECURITY AND CYBER RISKS
28. As the importance of digital information and networks grow, cyber security is of high
importance and therefore a corporate priority. The type of risks posed include theft of sensitive
corporate and personal data, theft or damage to data, threat of hacking for criminal or fraud
purposes, and potential disruption to infrastructure such as Council ICT systems, intranet,
and public facing website. 
29. To highlight the scale of the cyber security threat, our firewalls trap and stop thousands of
attempted network intrusions every week. In the month prior to writing, the Council’s
Corporate email security system identified 106,000 emails – 4% of the total sent to
northlan.gov.uk addresses – as being sufficiently suspicious to warrant either delivery to the
Council’s Corporate email quarantine facility or prevented altogether at the email gateway.
The Council’s Corporate systems recorded 3.31M successful sign-ins. A further 319,000
attempted sign-ins failed, being a mix of apparent legitimate users plus others that were
deemed sufficiently suspicious to be blocked. Of those that failed, 280,000 originated from
the UK. It is worthy of note that 1,300 failed attempts alone originated from Russia. Publicised
breaches over recent years (such as in respect of SEPA, British Library, Western Isles
Council, Leicester City Council and Dumfries & Galloway Health Board) have individually and
collectively demonstrated that public sector organisations can be significantly compromised
following just one successful intrusion. 
30. Strategically, the Council now faces risk on several fronts in terms of managing ICT security
and cyber risks. These include: 
a. The ever evolving and growing cyber threat landscape. As noted in NCSC’s Annual
review 2024, “Due to the changing geopolitical environment, including the ongoing war in
Ukraine, the rise of state-aligned groups from around the globe, and an increase in aggressive
cyber activity, it is highly likely the cyber threat to UK CNI [critical national infrastructure] has
heightened in the last year.” Even where public sector organisations do not find
themselves directly compromised by successful cyber-attacks; it is becoming
increasingly likely that their supply chain will be. Supply chain attacks can have serious
consequences on the public sector. In June 2024, patient data managed by pathology
testing organization, Synnovis, was stolen in a ransomware attack. Given the
sensitivity of the data and the impact this breach had on the delivery of healthcare
services, at the time it was described as “one of the most significant and harmful cyber-
attacks ever in the UK.” Organisations must spend ever greater effort and resource
delivering activities capable of mitigating potentially catastrophic events, Growing
appreciation of supply chain dependencies and the knowledge that internal processes
can be severely compromised though cyber breaches affecting suppliers and vendors
highlights the interconnected nature not just of IT systems but of wider business
operations.
b. Budgetary constraints affecting all public sector organisations in Scotland make it
challenging to create and sustain vital posts to manage the Council’s complex security
domain effectively. Competition for suitably experienced and qualified security
personnel across the marketplace is fierce, with such roles typically carrying premium
reward expectations which exceed the Council’s pay structure. This is called out
explicitly in the Council’s Workforce Plan where cyber security specialists are noted as
being particularly difficult to recruit into public sector organisations like the Council.
Succession planning is critical given there are high instances of ‘single points of failure’
within the Information Risk Management and Secure Access Teams; presently the loss
Page 179 of 376

Page 180

18 
of a single staff member negatively impacts the scope and productivity of these critical
council functions.
c. As digital technologies become more prevalent within the Council, so the cyber-attack
surface increases. Providing the same level of protection as current over an
increasingly broad and complex range of ICT services will become more challenging
for the Council given projected budgetary pressures. This is particularly poignant given,
across both the Education and Corporate estates technical staff are currently expected
to support 550 servers, 12,173 desktop computers, 29,954 laptops, 13,979 tablet
devices, 5,193 smart phones, circa. 260 server software/applications and over 3000
unique desktop/device types of software installations.
d. The continued rate of uptake of digital technologies to support service delivery means
that ICT and cyber incidents will have an ever-increasing impact over time. If the
Council loses staff to manage budget expectations, there will be a similarly increasing
gap over time in the ability of the Council to ‘fall back’ on non-digital processes should
a major ICT outage occur.
e. Artificial intelligence poses both a risk and an opportunity in terms of cyber security. It
will enable threat actors to be more successful in their operations whilst providers of
countermeasures will similarly take up the opportunities which AI offer.  
31. To mitigate against cyber risks, the Council follows best practice wherever possible. We
comply with the requirements of the Scottish Government Cyber Resilience Framework by
currently having the Chief Officer (Business and Digital), as SIRO, identified as responsible
for organisational cyber resilience arrangements. In addition, the Council works towards
adoption of recommendations published by the National Cyber Security Centre (NCSC), who
advise that cyber risk has been, and is likely to continue to, increase substantially. The Council
follows published NCSC guidance and adopts the following approaches: 
a. Compliance with the externally inspected Public Sector Network (PSN)
accreditation via submission of the required IT health check findings, and
implementation of recommendations identified as addressing potentially high-
risk issues.  The Council recently achieved continued PSN compliance effective from
27th January. Certification remains valid for a further year, following acceptance by the
Cabinet Office of the Council’s plans to address ‘high’ vulnerabilities identified in
respect of legacy applications such as HSMS, MySwis, eFinancials and
CivicaOpenRevenues. Known vulnerabilities in respect of both financial products
expect to be addressed through the Digital North Lanarkshire Programme of Work
deliverable ‘Review tools and products currently deployed to support the council’s
financial management arrangements, identifying and assessing options for longer-term
suitability, as well as opportunities to deploy efficient and effective automation and self-
service’, which has a target completion date of March 2025.
b. Compliance with the Payment Card Industry Data Security Standard (PCI DSS),
with the Council continuing to be fully compliant across both person present and
ecommerce payment channels and working towards achieving the same for the
telephony channel as part of the procurement of a new unified communications
platform.
c. A suite of malware protection products fully deployed e.g., antivirus software, web
filtering, and email malicious content/payload detection systems, together with real-
time analysis of security threats identified and managed through deployment of
Security Incident Event Management (SIEM) software. Responding to threats in a
timely manner is supported through the actions of partner organisations and functions,
such as the Scottish Government’s Security Cyber Coordination Centre and
subscribing to the services of a managed security operations centre.
Page 180 of 376

Page 181

19 
d. Firewalls installed to protect the network, systems, and devices from external attack,
exploitation, and data breaches, with an external contract in place to undertake
penetrative testing, and any issues, anomalies or system vulnerabilities identified,
investigated, and remediated.
e. Operation of a robust “patching” regime, with such automatically applied on
scheduled dates where appropriate or as and when critical vulnerabilities are identified,
and patches made available. 
f. Robust authentication and access control procedures e.g.: multi-factor
authentication in place to protect Council systems from unauthorised access and with
continual improvements to access and authentication methods being made to address
the threat landscape.  
g. ICT systems securely configured as part of the initial commissioning process, with
formal change control procedures being in place should system settings need to be
modified.
h. Office “based” staff required to complete Mandatory Information Security Awareness
training.
i. Non-office-based staff receive information security and governance awareness
training through ‘toolbox’ delivered sessions.
j. Continued adoption of NCSC’s active cyber defence toolkit as promoted through the
Scottish Government’s cyber security Public Sector Action Plan. 
32. The Information Security and Information Governance risk process described in paragraphs
14 to 19 above does not record all activities underway to maintain the Council’s security
posture considering the threat landscape.  Business and Digital officers routinely seek to
improve arrangements by using Gartner’s self-analysis and maturity assessment tools to
direct future actions and confirm planned direction of travel. During the reporting period in
question, the following ICT and cyber security focussed activities were undertaken to maintain
a positive information governance assurance: 
a. Resourcing within the Information Risk and Security Team was maintained at the
increased level of 4.8 FTE. Recruitment is also under way for a temporary (funded for
2 years) Senior ICT Security Officer. It is planned to recruit a Graduate Developer into
a security role at the start of 2025, and the creation of two posts as Security Operations
analysts has commenced.
b. The Council has dropped use of the NCSC’s ‘Exercise-in-a-Box’ evaluation tool to
assess ICT resiliency capability. It is now coordinating with the Digital Office for
Scottish Local Government to conduct a half-day workshop, scheduled for early 2025,
with the aim of gaining a deeper understanding of the efficacy of Council effectiveness
at responding to a major cyber security incident.
c. Operation of a phishing simulator solution to help train staff for the warning signs
associated with one of the most prominent cyber threats facing organisations, phishing
emails.
d. Management of third party cyber security risks, in particular supply chain risk, through
focussed use of the Scottish Government’s ‘Cyber Security Procurement Support
Toolkit.’ Improvement actions under way are focusing on obtaining lifetime assurance
of products and suppliers as appropriate, not simply at the procurement stage.
e. In recognition of the value of aligning with public sector peers, whilst fulfilling an action
determined through a previous Information Security Maturity Assessment exercise, the
Council is developing information security standards based on work already
undertaken by the Department for Work and Pensions. 
Page 181 of 376

Page 182

20 
f. Activities are under way to better ensure that password usage meets NCSC’s
recommendations for length and structure, and marketing NCSC’s ‘three random
words’ approach to password creation, focusing on the Council’s Education-based
staff
g. Implementation of an automatically configured ‘virtual private network’ for all Council
devices used remotely.
h. Continued awareness programme targeting all Council staff and employees, including
focused sessions where appropriate.  The set of mandatory training materials which
all staff must review has been overhauled over the course of 2024 and will launch
officially before the end of the 2024/15 financial year. 
33. The Digital North Lanarkshire Programme of Work deliverable of ‘ensure useful, secure,
compliant and digital first applications are available to support critical but streamlined service
delivery’ will transition all products to more secure and modern cloud-hosted solutions, but
such cannot be achieved overnight. Prioritisation is therefore essential, and Business and
Digital officers risk-assessed all critical legacy systems during 2023-24 to aid resource
allocation. A summary of assessments is provided within Annex C. 
34. As referenced in section 31(a) above, this deliverable is progressing with the priority business-
critical – but ageing - systems (e.g. Housing Management System, Social Care System,
Financial systems) which rely on older – and often unsupported – software and applications
actively under consideration as follows: 
a. The Housing Committee awarded the contract for a replacement housing and asset
management system to Civica UK Limited on 6th November 2024, with contract
mobilisation and development of detailed implementation plans now underway. 
b. Deployment of Mosaic, the replacement case management system for MySwis, is well
underway. Go-live is currently planned between March and May 2025, with such
dependent on key functionality and integrations effectively meeting user testing
requirements.   
c. The Financial Systems review is behind schedule. The Digital North Lanarkshire
Programme Board considered progress against this deliverable at its December 2024
meeting. With limited progress evident to date, a target date for finalising options of
March 2025, and a risk assessment of 20 (red) presented in respect of the current
eFinancials product being used medium to longer-term, the Board agreed that lack of
progress should be flagged to the CMT. The Board also instructed Financial Solutions
to provide their project plan as a matter of urgency. The service has committed to doing
so. 
35. The council was not affected directly by any notable ICT or cyber security incidents during the
2024 calendar year.  The potential consequences arising from supply chain compromises did
not go unnoticed, however. Whilst the ‘Crowdstrike’ issue from June 2024 did not affect
Council-managed systems, some managed services were impacted. Whilst outages were for
a few hours at the most and did not affect critical functions, once again this highlighted the
supplier dependent nature of business processes. The Council continues to be affected by
day-to-day events that all organisations are affected by, and which are mitigated through the
suite of technological and process controls in place, such as email filters, web gateways,
network firewalls, web application firewalls, and anti-malware tools.  The Council monitors
centrally for issues that may affect its ICT service delivery through alerts provided by Scottish
Government and the National Cyber Security Centre. 
Page 182 of 376

Page 183

21 
36. In summary, there continue to be successes in managing ICT and cyber risk, but challenges
will grow given vital legacy systems – and the security vulnerabilities arising from them –
cannot be addressed short-term. Vulnerabilities arising from legacy systems in use have
previously hindered our ability to achieve an unqualified formal PSN accreditation. Whilst
ongoing accreditation has recently been confirmed to January 2026, such is again based
upon the Council taking action to address the high-risk vulnerabilities so identified. 
CORPORATE GOVERNANCE ACTIVITY 
37. The Council is committed to a clear strategy and sustainable framework for information
governance and security so deploys its requirements through the Information Governance
Policies contained within the approved Digital and IT Strategy. The ‘Strategic Governance
Framework – Annual Review and Refresh’ report considered by the Audit and Scrutiny Panel
in June 2024 confirmed these policies and the associated user guidance remain fit for
purpose, having been allocated ‘Green’ RAG 1status during this most recent evaluation. 
38. Through the Data Governance Board (DGB) and Data Management Team (DMT) remits, the
Council has identified Business Data Owners for its four key data classifications of customers,
cases, people, and the organisation. Section eleven above illustrates however, that these are
currently being reviewed following several changes to structures and key personnel. The DGB
has continued to meet during the review period to ensure measures remain in place to
maintain relevant compliance levels, and direct activities capable of moving the Council
towards an ‘advancing’ (level 4) level of data maturity to (a) assist services in monitoring
performance against The Plan for North Lanarkshire outcomes, and (b) view data as a ‘single
source of truth’ to support strategic decision making, service delivery, cost reduction and risk
management arrangements. 
Data Maturity Assessment 
39. Building upon improvement actions previously identified within the Council’s Data and
Information Management Strategic Roadmap, and activities underway to support the Council
to achieve its targeted ‘advancing’ data maturity level, Business and Digital – aided by Gartner
- re-assessed current levels of maturity in early 2024.  The outcome indicates that corporate
governance activity to date sees the council’s overall Data Maturity Score improving from +1
(Initial/Basic) to -3 (Developing), against a benchmark score for similar organisations of 2+
(Basic). 
40. Further details in respect of the Data Maturity Assessment are provided within Annex D, with
Table 1 below summarising the key findings and actions which the DGB has built into its
programme of work from 2024 onwards. A copy of this programme (as of December 2024) is
provided as Annex E. 
Theme Functional Activity  NLC Score Benchmark
Create the vision and
strategy
Implement the strategy  4 2
Align data and analytics to
Business Outcomes
Innovate the business model  2 2 
1 Green status – No requirement at this time to review or update this item, but such is planned for 2025.
Page 183 of 376

Page 184

22 
Theme Functional Activity  NLC Score Benchmark
Develop the data and
analytics organisation and
talent
Develop data literacy  2 2
Create and maintain
analytics content
Create and maintain
semantic models 
1 2
Integrate and manage data  Organise data assets  1 2
Integrate data assets 1 3-
Share data assets.  1 2
Govern data and analytics
assets 
Enforce governance policies  4 2
Communicate governance
policies 
2 1+ 
Information Governance Training 
41. The DGB and DMT have responsibility for continuously monitoring the actions required to
manage information issues, risks, and cultural behaviour to improve existing data governance
and management. Paragraph 12(b) above specifically references the importance of
information governance training, an identified area of improvement and activity over the last
few years. 
42. At present, the majority of mandatory training modules need to be completed biennially, with
the DGB regularly examining compliance levels; firstly, to gain assurances that staff are being
trained in information governance; secondly, to identify areas requiring targeted activity, and
finally, to assess the impact which planned improvements regarding performance monitoring
have had 
43. The ‘SIRO Information Governance – Assurance and Performance Report (April 2022 to
November 2023)’ considered by the Finance and Resources Committee in February 2024
highlighted poor levels of mandatory training compliance council-wide, with an improvement
action to ‘raise the profile and prioritisation of Information Governance and Data Protection
responsibilities’ therefore identified.   
44. Following consideration of the SIRO report, the Business Management Team (BMT) and
Corporate Management Team (CMT) increased their oversight and monitoring to improve
compliance levels across the council on all mandatory training, not solely information
governance. This had led to strengthened arrangements being deployed, with Chief Officers
now receiving monthly reports from the learning management system detailing staff within
their business area who are either non-compliant with requirements or whose compliance
with one or more of the mandatory modules is due to expire within the next month.   Page 184 of 376

Page 185

23 
45. In revising arrangements, People Resources introduced the following RAG status for ‘in-
scope’ employees below based on levels of non-compliance: 
a. RED – above 31% non-compliance
b. AMBER – 21% to 30% non-compliance
c. GREEN – 0% to 20% non-compliance 
46. Table 2 below summarises non-compliance levels for the information management related
modules as of 7th December 2024. 
Mandatory Module Service Area – Non-Compliance %
Chief
Executives
Adult Health
& Social Care
Enterprise &
Communities
Education
& Families
Data Protection Essentials 2% 16% 3% 11%
Information Security 2% 17% 4% 11%
Records & Information
Management
3% 24% 4% 14%
Introduction to Risk 3% 21% 4% 13%
Data Protection Advanced 6% 20% 11% 16% 
47. Illustrating that circa. 11,800 employees are considered in scope to complete information
management mandatory training modules (except Data Protection Advanced – 1,869 in
scope), chart 3 below presents the level and percentage of completions, per service, in
December 2024. 
Chart 3
0 2000 4000 6000 8000 10000 12000 14000
Chief Executives
Adult Health & Social Care
Eduction & Families
Enterprise & Communities
Council
INFORMATION GOVERNANCE MANDATORY TRAINING COMPLIANCE AS
AT 7th DECEMBER 2024
DP Advanced in scope Data Protection Advanced All other modules in scope
Introduction to Risk Records & Information Management Information Security Awareness
Data Protection Essentials Page 185 of 376

Page 186

24 
48. Finally, from a mandatory training perspective, chart 4 below tracks the peaks and troughs of
training activity from January 2022 to December 2024, clearly demonstrating significant
improvements in compliance levels following deployment of the strengthened monitoring and
oversight arrangements. 
Chart 4 
Records Management Plan 
49. The Council has a Records Management Plan in place as required by the Public Records
(Scotland) Act 2011 (PRSA). The plan outlines the Council’s approach to Records
Management and identifies key roles including the senior official responsible for records
management, Data Protection Officer, operational Records Manager and Archivist. 
50. The Records Management Team continues to work on the specific areas that the Keeper of
the Records of Scotland has identified for improvement, namely Business Classification (File
plan and Information Asset Register), Destruction Arrangements, Vital Records and Audit Trail.
Following implementation of a file plan and physical records management using
O365/Avepoint Opus, the DGB has undertaken to review the proposed approach to
implementing semi-automated destruction in O365 and moving to roll this out in line with
commitments made in the Records Management Plan in 2025/26.
51. The PRSA Assessment Team has a mechanism that allows authorities to self-report on its
arrangements and commitments laid out in the Records Management Plan. The Council was
commended for submitting a Progress Update Review (PUR) in 2022 and continuing to take
its statutory obligations seriously. This report was published on the National Records of
Scotland’s website in November 2022. North Lanarkshire Council and North Lanarkshire
Licensing Board Progress Update Review (PUR) Report by the PRSA Assessment Team 15th
November 2022 (nrscotland.gov.uk). The Records Manager will submit a further PUR in 2025
and continues to liaise with the Assessment Team, informally, to ensure that any changes
proposed in response to the ever-changing records management landscape will not conflict
with the Council’s responsibilities under the Act.
0
200
400
600
800
1000
1200
1400
1600
1800
2000
Mandatory module completions trend January 2022 - December
2024 (part month)
Data Protection Essentials Data Protection Advanced
Information Security Awareness Records & Information Management
Introduction to Risk
Page 186 of 376

Page 187

25 
52. The Keeper of the Records of Scotland will in due course request a fully revised Records
Management Plan to be submitted with accompanying evidence of progress made since the
initial plan was approved in 2017. It is anticipated that the invitation will not be before 2026,
with a six-month timeline available to complete and submit the new plan.  
Page 187 of 376

Page 188

26 
LIVE IMPROVEMENT PLAN
53. Paragraph 12 above highlights the DGB is responsible for directing required improvements
in the Council’s data governance arrangements.  The detailed Terms of Reference, attached
as Annex A below, and DGB workplan (Annex E) taken together illustrate how the DGB and
DMT provide ongoing assurances regarding the Council’s information governance. The
workplan in particular outlines key tasks required, together with details of the responsible
officers, and indicative scheduling. 
54. By its nature, improvement activities and the workplan must be flexible and dynamic, with any
new improvement areas identified by for example services, Business Data Owners,
management, and Internal Audit appropriately incorporated. Having examined and assessed
information governance activities throughout 2024, the SIRO has determined that further
effort is required during 2025 in the following areas to strengthen the Council’s information
governance and data accuracy arrangements. 
a. Raise the profile and prioritisation of Data Protection responsibilities 
➢ Section 2 above illustrates everyone - staff and elected members - must understand
the importance of information governance and security, as compliance with its
requirements depends on all operating good practice. 
➢ Whilst mandatory training completion and breach reporting rates were markedly
improved during 2024, there is still concern regarding (i) the level of data breaches
being reported to Legal Services within the 72-hour requirements, and (ii) levels of
email misuse which led to potential data breaches. Further targeted promotion to be
scheduled, ideally aligned with the launch of the refreshed information security
mandatory training course, no later than the end of the 2024/25 financial year. 
➢ Additional discretionary training, linked to refreshed requirements of Business Data
Owners, Data Stewards, and Data Architects, to be developed and deployed during
2025 
b. Refresh and strengthen approach to mitigating Cyber Security risks and
vulnerabilities 
➢ The Council continues to use PSN accreditation as the principle means of
demonstrating external oversight of the Council’s security posture, with compliance
confirmed for one further year from 27th January 2025.  Efforts are underway through
the Digital North Lanarkshire PoW to reduce vulnerabilities associated with legacy ICT
applications. Given outcomes will be closely monitored by the PSN assessors and UK
Cabinet Office (PSN sponsor and accreditor), these areas of activity must be
resourced as a priority. 
➢ Paragraph 34(c) above illustrates Financial Solutions are committed to developing,
and deploying, a project plan aligned to the PoW deliverable in respect of ensuring
financial management systems used longer-term are ‘useful, secure, compliant and
digital first’. The Digital North Lanarkshire Programme Board, Enterprise Architecture
Governance Group (EAGG) and DGB should collectively ensure that oversight of this
project, and its resourcing, is effective.  Page 188 of 376

Page 189

27 
➢ Continue to develop and deploy the pipeline of information security standards in
accordance with the ‘production schedule’ considered at the Digital North Lanarkshire
Programme Board in December 2024. 
➢ Enhance supply chain risk management by developing a proportionate framework to
facilitate assurance of third-party products over the product lifecycle, agreeing
monitoring mechanisms through the Digital North Lanarkshire Programme Board. 
➢ Fully evaluate cyber security metrics presently being developed through the Digital
North Lanarkshire Programme Board. 
➢ In line with the programme of enhancements to conditional access controls approved
at DGB and BMT in December 2024, allocate resources to ensure implementation is
aligned with the deployment of Windows 11 compliant devices. Headline deliverables
to include blocking legacy authentication; requiring Multi Factor Authentication (MFA)
and deploying self-service password reset. 
➢ Email continues to be the number one tool leveraged by malicious threat actors to
breach Council cyber security controls. Considering this alongside data breaches
linked to email misuse, the Council will roll out a technology solution during 2025 to
enhance its email security, providing improved protection from incoming malicious
emails and reducing the risk of users sending potentially sensitive emails to unintended
recipients 
c. Iterative deployment of the Data Governance Board approved Workplan (Annex E). 
➢ The improvement actions identified in the DGB Self-evaluation exercise (2021) are
now superseded by the DGB review of June 2024, and the DGB workplan attached at
Annex E. This includes the following for example: 
o Enhancing the knowledge and understanding of all DGB members, especially
those new to the role though the development of an induction pack for
members, comprising role profile, FAQ, and jargon buster. 
o Reviewing the suite of performance measures that are in place to provide the
DGB with the relevant assurances in respect of data governance to ensure
these remain fit for purpose and in line with the DGBs updated terms of
reference.  This includes due consideration and implantation of more automatic
data capture and reporting arrangements through PowerBI dashboards. 
d. Enhanced implementation of the council’s strategic approach to data and
information management in line with the Programme of Work to 2028 and the DGBs
updated Terms of Reference. 
➢ To build upon the foundations established through the Data and Information
Management Strategic Roadmap established in 2020, a range of inter-related activities
are underway to ensure the councils use and approaches to data remain aligned and
continue to ensure organisational compliance with the legislative and regulatory
requirements relating to the handling and processing of information and provides
assurance of ongoing improvements to manage information risks. This includes
managing data in line with the CIPFA Delivering good governance in local government
framework.
Page 189 of 376

Page 190

28 
➢ Following completion of the DGB review in June 2024, the new working arrangements
are in place and the next steps include a complete review of DMT, including Terms of
Reference to ensure alignment with the updated DGB terms of reference and the
refreshed approach to its operation. 
➢ Implementation of a Data Hub as a single source for accessing corporate data that is
a single source of truth for use across the council.  This aims to unlock the potential of
data and create meaningful insights that support the council in data management and
information governance, as well as managing services and delivering the Programme
of Work in line with The Plan for North Lanarkshire. This will incorporate all related
aspects of data, including governance, quality, data maturity, spatial mapping, open
data, and supporting architecture and technology (including continued development in
the supporting tools, such as Power BI and Geographic Information System (GIS) to
better automate processes and enhance data insights).  Ensuring fit for purpose
supports and approaches to building and cascading of skills across the council in terms
of working with data and using the supporting tools will also be incorporated in line with
corporate processes and requirements.
CONCLUSION
55. In summary, significant progress to strengthen the Council’s approach to managing its
information risks continued over the period of this report with sections 20 to 52 above
providing relevant context and detail. 
56. Improvements can always be made, and with a residual risk score of 20 prevalent in respect
of our Information Governance and Information Security corporate risk (October 2024), this
subject matter remains a high priority improvement area for the Council. 
57. A detailed improvement plan exists and is monitored by the DGB. A summary of the priority
actions at December 2024, is detailed in section 54 above. Progress against these will be
managed by the DGB from January 2025 onwards, who will look to further develop policies,
guidance, standards, processes, and approaches as appropriate to improve awareness,
understanding and compliance with legislative requirements and good practice. 
58. With our PSN accreditation dependent upon UK HMG Cabinet Office being satisfied we have
sufficient protections in place to address high-risk vulnerabilities in our ageing critical systems,
and people and financial resources projected to remain extremely scarce and challenging,
there is heightened concern in these times of increasing cyber-attacks regarding the Council’s
ability to fully secure the data held within older legacy business applications. Actions are
identified and largely underway through the approved Programme of Work and capital
investment programme to address this growing risk, but concern remains regarding the
organisation’s capacity to resource required activities in a timely manner. 
Katrina Hassell
Chief Officer (Business and Digital) 
Page 190 of 376

Page 191

Annex A
Data Governance Board
Terms of Reference
29 
A. Purpose 
The purpose of the Data Governance Board is to maintain strategic oversight and implementation of the
council’s approach in relation to data governance and to secure the relevant assurances that effective
arrangements are in place for the safe and secure collection, storage, use, and sharing of data, including
processes to safeguard personal data and support data quality.  This includes responsibility for developing and
overseeing the implementation of strategies, policies, procedures, and standards in relation to data
governance and data management, and for directing improvements in accordance with legislative, regulatory
and corporate governance requirements and in support of the organisation’s corporate vision and strategy. 
The Data Governance Board is also responsible for directing and overseeing the work of the Data
Management Team and ensuring measures are in place to monitor compliance across the council and its arm’s
length external organisations. 
B. Legislative, regulatory, and corporate governance requirements 
• Data Protection Act 2018. 
• Freedom of Information (Scotland) Act 2002. 
• Public Records (Scotland) Act 2011.
• CIPFA Good Governance in Local Government Framework (2016) in respect of Managing Data. 
C. Membership 
Core members consistent attendance
• Chief Officer (Business and Digital) - Chair
• Chief Officer (Legal and Democratic) - Vice-Chair.
• Business Strategy Manager.
• Technology Strategy Manager.
• Corporate Records Manager.
• Strategy and Performance Manager.
• Nominated representatives from services aligned to data roles and responsibilities in respect of the data
entities for cases, customers, organisation, place, and people.
• Officer who holds the role of the council’s Data Protection Officer (if not one of the above).
• Officer who holds the role of the council’s Senior Information Risk Owner (SIRO) (if not one of the above). 
• Chair of the Data Management Team. 
• Management Support Officer - minutes. 
Given the specialist data governance knowledge that is required to understand the work of the Data
Governance Board, substitute members are only permitted in exceptional circumstances. This is critical to
ensure those attending meetings have the appropriate knowledge, skills, and abilities to discharge their duties
and that this is enhanced over time through ongoing and consistent involvement in the Board’s business. 
Non-core members attendance as required depending on the business to be dealt with
• Subject matter experts. 
D. Remit 
The primary remit of the Data Governance Board is noted below against three categories of Board
responsibilities (approach, deployment, and assessment and review): 
Approach
1. To be assured that the council achieves and maintains compliance with legislative, regulatory, and
corporate governance requirements, including that listed in section B. 
2. To ensure the council has effective data governance standards and policies in place which have been
developed in line with legislative, regulatory, and corporate governance requirements as well as
accompanying policies, guidance, and professional codes of practice. 
3. To maintain oversight of the council’s data governance policies and standards to ensure they remain
effective, up to date, and fit for purpose, including (but not limited to) the Data Protection Policy,
Information Security Policy, Records and Information Management Policy, Payment Card Data Security
Page 191 of 376

Page 192

Annex A
Data Governance Board
Terms of Reference
30 
Policy, Acceptable Use of ICT Policy, Records Management Plan, and in respect of Data (i.e. governance,
quality, and open data). 
4. To ensure the council’s approach to data governance is aligned to, and effectively supports, what the
organisation ultimately aims to achieve through its corporate strategy, i.e. through The Plan for North
Lanarkshire and the delivery vehicle of the Programme of Work. 
5. To ensure the council’s approach to data governance aligns to other corporate strategies, policies, and
plans as appropriate.  This includes, but is not limited to, the Digital and IT Strategy and its data principles:
a) Data is an asset - Data is an asset that has value to the council and other parties and must be
managed accordingly.
b) Data has an owner - data will have a named Information Asset Owner accountable for the data
quality and currency.
c) Common data definitions - Data is defined consistently throughout the council, standardised,
understandable, and distributed.
d) Information security - Data is protected from unauthorised use, disclosure, and change. 
Deployment 
6. To ensure the council’s data governance standards, policies, and procedures:
a) Enable the organisation and staff to discharge their duties regarding the use of information.
b) Ensure that personal data held by the council is accurate, kept confidential and secure, accessed only
by those with legitimate need, and available when required.
c) Make sure records (paper and electronic) are disposed of in an appropriate manner, relative to their
confidentiality when no longer required and in line with records management policies and codes of
practice. 
7. To promote data governance and associated good practice across the organisation and its arms-length
external organisations.  This includes communicating the importance of data governance to all staff,
promoting a council wide culture that data governance is the responsibility of everyone, advocating for
data governance initiatives, fostering a data driven culture within the organisation, and developing (and
contributing to) regular reports, newsletters, website content, and other publicity materials. 
8. To maintain oversight of roles and responsibilities related to data governance, such as data owners, data
stewards, data custodians, data admin, and data users.  This includes ensuring roles are clearly defined
and that individuals in these roles have appropriate training and guidance to perform their duties
effectively. 
9. To monitor the provision and uptake of training provided to support effective data and information
governance across the council in order to ensure that staff are trained, comply with, and understand the
consequences of not adhering to relevant policies and procedures. 
10. To set the Terms of Reference for the Data Management Team and oversee and direct its work in
cascading and co-ordinating the implementation and deployment of all relevant data governance
strategies, policies, plans, standards, and arrangements as approved by the Data Governance Board. 
11. To ensure all members of the Data Governance Board and Data Management Team are provided with
appropriate training and guidance in order to discharge their duties as members of the respective group. 
Assessment and review 
12. To receive and consider reports into breaches of confidentiality and security and where appropriate
undertake or recommend remedial action.  This includes promoting learning that arises out of
investigations into data breaches. 
13. To receive, review, contribute to, and sign off (where required) reports in advance of further oversight or
scrutiny by the Business Management Team / Corporate Management Team or one of the council’s
Committees.  This includes:
a) Assisting the Senior Information Risk Owner (SIRO) in the preparation of the annual Information
Governance Annual Report and signing this off prior to submission in line with the relevant
Page 192 of 376

Page 193

Annex A
Data Governance Board
Terms of Reference
31 
timescales.
b) Reviewing the annual Data Protection report produced by the corporate Data Protection Officer.
c) Scheduled Internal Audit reports pertaining to data or information governance.  
d) Reviewing and updating progress against identified audit actions and responding to new audit
recommendations as required. 
14. To regularly review the Board’s data governance programme and one council approach to assess its
effectiveness, identify areas for improvement, and makes necessary changes to the respective data
governance arrangements, policies, and procedures.  This review includes ensuring the council:
a) Undertakes - or commissions - annual assessments and/or audits of its data governance policies,
procedures, and arrangements.
b) Carries out a regular data quality assessment.
c) Regularly reviews its movement on the data maturity curve, ensuring that planned activity is directed
towards achievement of the advancing stage of the maturity scale.
d) Has appropriate data governance performance measures in place to assess effectiveness and
compliance, with regularly monitoring and reporting processes in place to ensure Board oversight and
inform continuous improvement where required. 
15. To maintain regular oversight of risks on the Corporate Risk Register in relation to information governance
and security to ensure the supporting controls and actions remain relevant and in place to mitigate against
the risks identified. 
E. Decision making 
The Data Governance Board is the council’s main decision-making body in respect of strategic data
governance issues.   
The Data Governance Board is accountable to the Business Management Team (in respect of the council’s
compliance with legislative, regulatory, or corporate governance requirements) and the Corporate Management
Team (in respect of deployment and compliance across services) and will, where required, escalate matters as
appropriate for corporate decision making, endorsement, or action. 
F. Governance and accountability 
Through the Chair, the Data Governance Board will ensure reports are provided to the Business Management
Team or Corporate Management Team, as appropriate, where matters have an impact as per the respective
responsibilities as noted in section E. 
Where matters fall within the scope of the Scheme of Administration, reports will be submitted to the Audit and
Scrutiny Panel through the Chair. 
The Terms of Reference for the Data Governance Board shall be reviewed at least annually to ensure the
Board continues to meet the business needs of the council and ensure ongoing compliance with legislative,
regulatory, and corporate governance requirements. 
G. Operation 
The Data Governance Board has been constituted at the request of the Corporate Management Team.   
Meetings will be held on a bi-monthly basis.  The Chair may convene a meeting at any time to consider matters
of an urgent nature. 
The agenda and any working papers will be circulated five working days working week before meetings.
Minutes will be published on the Data Governance Microsoft Teams site and the link circulated to members of
the group and other individuals, or groups as required. 
Page 193 of 376

Page 194

Annex B
Information Commissioner Office Guidance
North Lanarkshire reported data breaches
32 
The ICO issued the following guidance to the Council regarding its reported breaches:
➢ The importance of accurately recording information about data subjects within records
and ensuring that any manually recorded information is accurately migrated into any
electronic record; 
➢ Any attachments to emails should be correctly identified and that any manual
correspondence be accurately addressed and contain only information properly
intended for that recipient; 
➢ Populated forms should not be provided in response to requests for blank forms;  
➢ Forms populated with an individual’s personal data must not be used as a template; 
➢ Appropriate double checking and verification measures should be in place;  
➢ Managers must remind staff of their responsibilities to ensure that personal data is
processed securely. 
➢ In relation to cleansing of laptops, there must be appropriate checks to ensure that any
personal information is removed before issuing these laptops for use in school
classrooms; 
➢ Conduct appropriate checks of any devices that are used by pupils to ensure that there
is no personal information saved on them in error; 
➢ Changes of procedures should be communicated to all staff with routine testing of the
effectiveness of measures in place, and appropriate checks that staff are adhering to
these measures;  
➢ Remind staff of the provisions of section 170 of the Data Protection Act 2018 which
states that it is a criminal offence to unlawfully obtain, disclose, or retain personal data
without the consent of the controller; 
➢ Consider use of the schedule assistant to allow further time to check contents and
recipients are correct;  
➢ Documents containing personal data should be password protected before they are
sent electronically, with the password sent in a separate email;  
➢ Only members of staff who are required to use the personal data should have access
to it;  
➢ Care should be taken when discussing personal data in the presence of anyone who
isn’t authorised to know about it;  
➢ When individuals request that their personal data is handled in a particular way for
example, where there are concerns about their personal safety then this should be
clearly marked on their file and vigilance should be taken to ensure that these requests
are complied with; 
➢ Ensure systems are up to date and correct.
Page 194 of 376

Page 195

Annex C
Risk Assessment Summary
33 
Table of Risk Scores of P1 Applications over Time 
Application/
System
Current (Dec
2023) Residual
Risk Level
Future Forecast
– 1yr (Dec 2024)
Future Forecast
– 3yr (Dec 2026)
Future Forecast
– 5yr (Dec 2028)
Housing Services
Management
System
8 12 20 25
Building and
Cleaning
Management
System
6 9 16 20
giFT (Unix file
transfer system) 6 6 12 16
Confirm* 4 2 N/A N/A
Common
Housing Register
/Mutual
Exchange 
6 6 9 12
Home Insurance* 2 2 N/A N/A
eFinancials 8 12 20 20
Open Revenues 12 12 16 20
ASH Debtors 3 3 3 3 
• Risk was assessed using the Council’s 5x5 risk scoring matrix.
• Lowest risk score achievable is 5, highest 25.
• All scores are residual, based on future forecasts of supportability of product.
• High risk scores indicate increased likelihood of product becoming more costly to
support and maintain operationally.
• * Indicates where a system is intended to be transferred to a managed Cloud-hosted platform
or deprovisioned 
Observed Risk Factors by Application 
Application/System Observed Risk Factors
Housing Services
Management System
➢ No 3rd party supplier support contract
➢ Bespoke progress-based application, developed in-house to the
council
➢ 2 x contracted developer staff: aging demographic is a factor
➢ No release lifecycles.
➢ Vulnerabilities are likely to arise in the supporting operating
systems and software languages will need to be patched 
Building and Cleaning
Management System
➢ On premise server hardware is already 6-7 years old and out with
warranty.
➢ BCMS is another bespoke in-house product. 
➢ No 3rd party support and relies on small support team focusing on
minor adaptations and issues. With a single technical support
person remaining.
➢ Many systems that were once part of BCMS have now moved to
other SaaS offerings e.g. HR records management, payroll 
giFT (Unix file transfer
system)
➢ giFT is a computer software daemon, which runs as a background
process.
Page 195 of 376

Page 196

Annex C
Risk Assessment Summary
34 
Application/System Observed Risk Factors
➢ Council developed gift into standalone application for file transfers
➢ Been maintained for 20 years but developers reduced with a
single developer remaining.
➢ No 3rd party support contract 
Confirm* ➢ Off the shelf product
➢ Support contract
➢ Regular updates
➢ Confirm was mid-transition to software as a service mid-
evaluation, and fully migrated in June 2024. 
Common Housing
Register /Mutual
Exchange 
➢ CHR is a bespoke solution developed 2008/2009
➢ Closely linked to HSMS
➢ CHR is a bespoke in-house product. With no 3rd party support and
relies on 2 contracted developers' availability. 
➢ Aging demographic is a factor. 
Home Insurance* ➢ Bespoke in-house developed by North Lanarkshire Council in
1995
➢ Originally supporting 10,000 customers
➢ Customers have decreased through cheaper offerings or moving
house and selling up.
➢ Service and product have now been closed down. 
eFinancials ➢ eFinancials relies on underlying UNIX platform, with high reliance
on Java plugins which are difficult to support and have previously
been linked to breaches in other organisations
➢ Areas of the infrastructure will be end of life within the next 4
years. This reflects on the increased risk scoring for the 3rd and 5th
years
➢ Current plans for upgrades of Windows OS have not been
considered within this risk assessment as these are handled by
the End user computing team and organisation wide
➢ Hardware supporting some of the Operating Systems will have
aged and may require replacement to support future OS 
Open Revenues ➢ Current database software is out of support
➢ Lack of regular software updates from supplier
➢ Current Java software is out of date & problematic to support
➢ Lack of well-proven DR capability for system
➢ Risk of cyber breach is high due to lack of software updates &
regular security reviews 
ASH Debtors ➢ System is hosted in a preferred environment, NLC’s Azure cloud
➢ Application on most recent version
➢ No current operational support or compliance issues 
Page 196 of 376

Page 197

Annex D
Data Maturity Assessment
35 
How mature are our data and analytics functional activities? 
Page 197 of 376

Page 198

Annex E
Data Governance Board
Roadmap and Workplan (as of December 2024)
36 
The agenda will be structured around items which are categorised in relation to the type of assurance they provide to the Data Governance Board to
enable the Board to fulfil its requirements as per the Terms of Reference and be assured that the council’s data governance arrangements are robust.  The
following programme of work sets out the Board’s recurring agenda items in this respect. 
All other proposed agenda items (and specific projects / actions) will be subject to a triage process that is undertaken in line with the Terms of Reference
for the Board so that the Board is allowed due consideration of the piece of work at the appropriate moment during its lifecycle. 
This programme will be reviewed prior to each meeting and updated in line with the minute and action note from each meeting, anything added to the
programme will be noted on the action note accordingly. 
Agenda items 
Responsibility for
brining agenda
item to Board 
9 October
2024 
4
December
2024 
29
January
2025 
26
March
2025 
21 May
2025 
16 July
2025 
10
September
2025 
5
November
2025 
Board purpose 
1. Policy review and approve:  
• Annual review of Data
Governance Board terms of
reference. 
Katrina Hassell  X            X   
Approach /
Deployment /
Assessment and
Review 
2. Policy review and approve:  
• Update to the Data Protection
Policy (v 7.0 June 2023). 
Archie Aitken        X          Approach 
3. Policy review and approve:  
• Update to the Information
Security Policy (v4.0 June 2023). 
Rob Leitch        X          Approach 
4. Policy review and approve:  
• Update to the Records and
Information Management Policy (v
5.0 June 2023). 
Fiona Hughes        X          Approach 
5. Policy review and approve:  
• Update to the Payment Card
Industry Data Security Policy (v1.0
June 2023). 
Rob Leitch        X          Approach 
6. Policy review and approve:  
• Update to the Acceptable Use
of ICT Policy (v4.0 November
2023). 
Rob Leitch                X  Approach 
7. Performance review and
identification of actions for the Board
reps and/or actions to be cascaded to
the Data Management Team to
implement: 
• Data Protection annual report. 
Archie Aitken            X      Assessment and
Review 
Page 198 of 376

Page 199

Annex E
Data Governance Board
Roadmap and Workplan (as of December 2024)
37 
Agenda items 
Responsibility for
brining agenda
item to Board 
9 October
2024 
4
December
2024 
29
January
2025 
26
March
2025 
21 May
2025 
16 July
2025 
10
September
2025 
5
November
2025 
Board purpose 
8. Performance review and
identification of actions for the Board
reps and/or actions to be cascaded to
the Data Management Team to
implement: 
• Senior Information Risk Owner
(SIRO) annual report. 
Katrina Hassell    X  X            Assessment and
Review 
9. Performance review and
identification of actions for the Board
reps and/or actions to be cascaded to
the Data Management Team to
implement: 
• Mandatory e-learning statistics. 
Gillian Quinn    X    X    X     X  Assessment and
Review 
10. Performance review and
identification of actions for the Board
reps and/or actions to be cascaded to
the Data Management Team to
implement: 
• Performance indicators. 
Susan Lawrie      X    X    X    Assessment and
Review 
11. Risk management review: 
• Following quarterly review and
deep dive update in respect of the
corporate risk for Information
Governance and Information
Security.  
Rob Leitch    X  X  X  X  X  X  X  Assessment and
Review 
12. Deep dive:  
• Into the roles and
responsibilities of reps on the Data
Governance Board (and Data
Management Team), including the
purpose and operation of the Data
Custodian Model in practice. 
Susan Lawrie  X  X  X            Approach and
deployment 
13. Deep dive:  
• Into the role and purpose of the
Data Management Team. 
Katrina Hassell      X           
Approach /
Deployment /
Assessment and
Review 
14. Deep dive:  
• Into the data maturity
assessment. 
Susan Lawrie        X         
Approach /
Deployment /
Assessment and
Review 
Page 199 of 376

Page 200

Annex E
Data Governance Board
Roadmap and Workplan (as of December 2024)
38 
Agenda items 
Responsibility for
brining agenda
item to Board 
9 October
2024 
4
December
2024 
29
January
2025 
26
March
2025 
21 May
2025 
16 July
2025 
10
September
2025 
5
November
2025 
Board purpose 
15. Communication: 
• Ongoing action - where
required - in relation to agreement
of items which require to be: 
(a)  Escalated to the Corporate
Management Team / Senior
Management Team or other
Board/Group. 
(b)  Cascaded to the Data Management
Team for (i) implementation, (ii) to
provide a report / update back to a
future DGB meeting, (iii) for
information. 
(iii)  Communicated wider across the
organisation. 
Katrina Hassell  X  X  X  X  X  X  X  X 
Approach /
Deployment /
Assessment and
Review 
16. Accreditations: 
• Public Services Network
compliance. 
Rob Leitch        X          Assessment and
Review 
17. Annual review: 
• Data sharing agreements.  Archie Aitken          X        Assessment and
Review 
18. Business added to programme
from DGB meeting Action Notes: 
a. From DGB meeting on 19/06/24
- Retention schedule to be a
regular agenda item to ensure it
remains current and to ensure
compliance and consistency
throughout services (in line with the
Records and Information
Management Policy). 
Fiona Hughes  X      X      X   
Approach /
Deployment /
Assessment and
Review 
b. From DGB meeting on 19/06/24
- Open data report to be brought
back to the DGB. 
Linda Johnston              X   
Approach /
Deployment /
Assessment and
Review 
c. From DGB meeting on 14/08/24
- DGB information pack and
glossary to be created. 
Katrina Hassell /
Susan Lawrie      X           
Approach /
Deployment /
Assessment and
Review 
d. From DGB meeting on 09/10/24
- Work to be undertaken to
determine the programme of
communication which requires to
Fiona Hughes      X           
Approach /
Deployment /
Assessment and
Review  Page 200 of 376

Page 201

Annex E
Data Governance Board
Roadmap and Workplan (as of December 2024)
39 
Agenda items 
Responsibility for
brining agenda
item to Board 
9 October
2024 
4
December
2024 
29
January
2025 
26
March
2025 
21 May
2025 
16 July
2025 
10
September
2025 
5
November
2025 
Board purpose 
be circulated to employees
regarding the use and adherence
to the data retention schedule. 
e. From DGB meeting on 04/12/24
- Regular updates from the
Lanarkshire Data Sharing
Partnership Board to the DGB to
be a regular item on the agenda. 
Graeme Cowan    X    X    X    X 
Approach /
Deployment /
Assessment and
Review 
f. From DGB meeting 04/12/24 -
Demo to come back to the DGB in
January 2025 regarding the
electronic records management
system to see this in practice and
determine the next steps. 
Fiona Hughes /
Tracey Hughes      X            Approach 
g. From DGB meeting 04/12/24 -
Update to come back to the DGB in
January 2025 regarding the master
data management system. 
William
Cunningham      X            Approach 
Page 201 of 376

Page 202

Page 202 of 376

Page 203

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    EK/KS/FC/DC Date 26/02/25 
Revenue Monitoring Report Council Summary
1 April 2024 to 03 January 2025 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail KempE@northlan.gov.uk Telephone 07939 280601 
Me 
Executive Summary
This report updates on the overall financial position for the General Fund Account, Housing
Revenue Account and Adult Health and Social Care, for the financial year to 31 March
2025.  The report consolidates the budget monitoring position of all Services, highlighting
and explaining major variances as per the Council’s approved Financial Regulations. 
The Council approved its General Fund Revenue Budget on 15 February 2024.  Following
notification from Scottish Government of further funding made available to local authorities
the overall budget is now £1,008.867m.  A surplus of £6.830m is currently projected, largely
due to the reported position on loan charges and interest earned on revenue balances. 
This surplus is to support future budget challenges in accordance with the approved
reserves policy, and any budget smoothing strategy recommended by the S95 Officer. 
The 2024/25 budget incorporates £21.667m of net savings. It is projected that £20.245m
of the savings (93%) will be delivered within the financial year, with replacement savings
of £1.422m identified to fully address the shortfall.
Recommendations
It is recommended that the Finance and Resource Committee: 
(1) Acknowledge the financial position of the 2024/25 revenue budget; and
(2) Otherwise endorse the contents of this report. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 15
Page 203 of 376

Page 204

1. Background 
1.1 The Council’s approved Financial Regulations require services to remain within their
approved budgetary provision, and to report all significant deviations - defined as the
higher of £100,000 or 5% - within their budget monitoring reports.  Where significant
deviations are identified, services must provide explanatory commentary, outline the
action required to rectify such deviations and where relevant, must also highlight the
impact this has on other budget headings. 
2. Report 
2.1 At its meeting of 15 February 2024, the Council approved a General Fund Revenue
Budget of £1,016.750m including expenditure budgets which will be offset by ring
fenced grant resources of £15.290m, resulting in a net expenditure position for
monitoring purposes of £1,001.460m.  Additional funding has since been confirmed as
part of the Scottish Government budget setting, resulting in an overall total budget of
£1,008.867m. It should note that this overall budget also reflects the transfer of
£20.000m of funding from Revenue to Capital linked to Scottish Government funding
towards pay award. Further details of this are provided in paragraph 2.12 below. 
2.2 Following the budget setting in February the Council has an approved savings target
of £21.667m for 2024/25.  Further detail can be found in Section 2.13 below. 
2.3 Table 1 below summarises the projected income and expenditure position, which
illustrates a projected surplus of £6.830m, which will be available to support future
budget challenges in accordance with the approved reserves policy, and any budget
strategy recommended by the S95 Officer. 
Annual 
Budget
(£m)
Projected
Outturn
(£m)
P10
Variance
(£m)
P6
Variance
(£m)
P6 to P10
Movement
(£m)
Expenditure     
Total Expenditure 1,008.867 1,002.037 6.830 3.595 3.235
Income     
Aggregate External Finance   834.322   834.322 - - -
Local Tax Collection   168.999   168.999 - - -
Use of Balance   5.546 5.546 - - -      
Total Income 1,008.867 1,008.867 - - -
Forecast Surplus/ (Deficit): to
support future budgets
- 6.830 6.830 3.595 3.235
Table 1  
Page 204 of 376

Page 205

Analysis of Significant Variations
2.4 Table 2 below illustrates the projected outturn financial position of services:
Service P10 Outturn
(£m)
P6 Outturn
(£m)
P6 to P10
Movement
(£m)
Education, Children and Families - On Budget - On Budget -
Enterprise and Communities - On Budget - On Budget -
Chief Executives and Other
Corporate Services 2.815 Underspend 0.595 Underspend 2.220
Social Work (Non-Integrated) - On Budget - On Budget -
Executive Services Total 2.815 Underspend 0.595 Underspend 2.220
Financing Costs 3.000 Over recovery 3.000 Over recovery -
Other Budgetary Issues 1.015 Underspend - On Budget 1.015
Forecast Surplus/ (deficit): to
support future budgets 6.830 Underspend 3.595 Underspend 3.235
Table 2 
2.5 Education, Children and Families are reporting an overall breakeven position. 
However, it should be noted that there are a number of compensating variances within
this position. Underspends are projected within employee costs of £0.501m reflecting
actual and projected vacancies, along with the roll out of finalised HQ, cluster, and
school staffing structures.  Further underspends are forecast in relation to payments to
other bodies of £0.363m partly due to demand for family placements being lower than
resources available, which is partly offset by pressures within external ASN placements
and Gaelic provision.  There are also underspends in transfer payments of £0.284m
primarily in relation to early years provision and care plan payments, £0.371m in other
costs primarily linked to external grant synergies aligned to music provision, and
£0.101m underspend in supplies and services due to various compensatory factors
across the service. These underspends are offset by overspends in transport costs of
£0.850m in relation to ‘Home to School’ transport pressures linked to ASN and Gaelic
provision, property costs of £0.276m due to increased utility costs within the education
estate, together with a forecast under-recovery in income of £0.533m in relation to
reduced cross-boundary ASN placements within NLC settings. 
2.6 Enterprise and Communities continue to report a projected breakeven position, with a
number of compensatory variances contributing to this overall position.  Employee
costs are forecast to underspend by £3.690m as a result of vacancy savings partially
offset by increased overtime and turnover, together with an underspend of £0.418m in
administration costs due to grant income linked to free school meals received in
advance of need, partially offset by increased external advisor costs as a result of
vacancies. These underspends are offset by overspends in payments to other bodies
of £2.174m, primarily as a result of increased costs in relation to the finalisation of the
previous roads contract and the mobilisation of the new contract, in supplies and
services of £1.097m primarily in relation to ICT costs and food provisions,  and in
transport and plant of £0.295m, due to additional costs of work being outsourced prior
to completion of a new depot facility. 
2.7 Chief Executives and Other Corporate Services is reporting a projected underspend of
£2.815m, this a favourable movement of £2.220m from that previously reported, mainly
due to increased underspends in employee costs and supplies and services.  The
Page 205 of 376

Page 206

overall position is primarily as a result of employee vacancy savings across the service
totalling £1.589m, and an underspend of £1.429m within supplies and services
resulting from the current usage levels of cloud-based systems. These underspends
are partially offset by an overspend of £0.155m in property costs due to increases in
insurance premiums together with building costs relating to the Civic Centre and a net
under recovery of income of £0.179m predominantly attributable to previous
maintenance and repair contract arrangements, legal insurance, licensing and
registrars, partially offset by over-recoveries within rental allowances / rent rebates
overpayments and interest. 
2.8 In respect of loan charges and interest earned on revenue balances, as previously
advised, due to significant uncertainty and volatility within market conditions, and other
variables, there is a risk of movement in the level of net financing costs expected in the
current financial year.  Following further consideration and updating of a number of
factors, including latest projections on profiled capital expenditure, further refining of
interest on revenue balances modelling and interest rates observed, £3.000m of the
overall forecast net over recovery on budget is reported. Committee should note that
some of the factors contributing to the overall financing costs position are purely timing,
therefore, it is prudent to ensure the funding to manage these elements is earmarked
in line with the overall longer term funding strategy for loan charges and interest on
revenue balances.  The final position in this respect will be kept under review and
reported as part of the year end process. 
2.9 In addition, there is a further underspend of £1.015m mainly in respect of additional
Scottish Government funding for costs which are being partly met by other budgetary
provision. 
2.10 Committee are also advised that the budget for both council tax income and council tax
reduction (CTR) are monitored on an ongoing basis. This includes consideration of
council tax collection, CTR uptake and household numbers. In addition, an assessment
of expected credit losses will be required.  At this point in the financial year the Council
Tax product is expected to be on budget. 
2.11 The 2024/25 pay awards have now been agreed with the settlement for teachers being
an uplift of 4.27%, and for non-teachers an uplift of 3.6% or £0.67 per hour, whichever
is greater. The full implications have been incorporated into the period 10 monitoring
position reported by each Service. 
2.12 It should also be noted that Scottish Government has confirmed that £53.000m of their
funding towards local government pay will be made through capital funding for 2024/25.
In line with recent years, the Council has been asked to absorb a proportion of the
capital funding in lieu of revenue funding.  As a result, the reported net budget illustrated
in appendix 1 has been reduced by £20.000m, with a corresponding increase in
General Capital Grant. Local Government Finance Circular 9/2024 provides a
temporary amendment to the statutory accounting requirements for capital grant which
allows the necessary flexibilities in accounting such that the grant can be used to offset
the revenue pressures linked to pay award, thus ensuring this transfer does not have
a negative impact on the Council’s overall revenue position. 
Page 206 of 376

Page 207

2023/24 Budget Savings 
2.13 As outlined in paragraph 2.2 above, the Council has approved net savings of £21.667m
for 2024/25.  Each Service reports on the achievement of their savings within the
relevant service monitoring report.  It is projected that £20.245m of savings (93%) will
be achieved in the current year, with the in-year gap of £1.422m being fully mitigated
by replacement savings. 
Earmarked Reserves and Change Management Fund 
2.14 The Council’s audited annual accounts highlight a General Fund reserve balance of
£283.893m.  This balance includes £8.000m for the Contingency Fund, with a further
£245.690m earmarked for specific future commitments including £19.358m allocated
to the Change Management Fund to support one off costs of approved savings and to
ensure the Council has a resilient and sustainable financial plan. The remaining
£30.203m of funds represent balances that were not earmarked as at 31 March 2024
and have therefore been set aside to support future budget strategies. 
2.15 A total of £90.629m of earmarked reserves is profiled for use in 2024/25 with a further
£155.061m profiled for use in future years. It is currently projected that £58.486m will
be spent during this financial year with £187.177m anticipated to be required in future
years, and £0.027m no longer required. A summary position is shown in Appendix 2. 
Taking into account the projected forecast surplus of £6.830m, and the drawdown of
historic balances from the Capital Fund of £2.951m, it is expected that at the end of the
financial year the General Fund will include non-earmarked balances of £40.011m as
detailed in Appendix 3.  These balances are to support future budget challenges in
accordance with the approved reserves policy, and any budget smoothing strategy
recommended by the S95 Officer. 
Risks and Uncertainty 
2.16 All activities undertaken by the Council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy, Services manage these as part of their
overall corporate and service planning processes.  The current economic climate and
pay and non-pay inflation continuing at historically high levels, are some of the key
factors that have the potential to impact upon the Council’s ability to provide quality
services within approved budget levels. 
Housing Revenue Account 
2.17 The Housing Revenue Account is currently projecting an underspend of £2.300m for
the financial year. This position is primarily as a result of underspends in repairs costs
of £2.850m, employee costs of £0.300m as a result of increased turnover savings, and
future credit losses being lower than expected by £0.500m, partially offset by increased
awards of Universal Credit Assistance Fund of £1.500m.  The service anticipates that
£1.165m of savings (100%) will be delivered by year end. 
Adult Health and Social Care 
2.18 Council Adult Health and Social Care provision to the Integration Joint Board (IJB) is
projecting an underspend of £1.397m.  This position is primarily due to a projected net
underspend in employee costs of £5.927m mainly as a result of non-recurring reduction
of employer’s superannuation costs coupled with slippage in recruitment, partially offset
by higher than anticipated costs in relation to home support staffing costs.  There is
also an underspend in supplies and services of £0.413m mainly as a result of lower
Page 207 of 376

Page 208

than anticipated spend in equipment and adaptations. These underspends are partly
offset by a projected overspend of £4.607m in payments to other bodies and transfer
payments primarily in relation to anticipated spend in ‘Care at Home’ and Independent
Care Homes, and higher than anticipated transport and plant costs of £0.548m mainly
in relation to higher than anticipated staff mileage, coupled with estimated running costs
associated with vehicles for use across the Service.  However, it should be noted that
the reduction in pension cost is part of the delivery plan solution to manage an overall
recurring cost pressure of £11.400m over 2024/25 and 2025/26. 
3. Measures of success 
3.1 The Council continues to operate within approved budgeted resources.   
4. Supporting documentation 
Appendix 1 Summary by Division
Appendix 2 Anticipated Commitments – Earmarked Reserves
Appendix 3 Availability of One-Off Funds – Change Management Fund 
Elaine Kemp
Chief Officer (Finance) 
Page 208 of 376

Page 209

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 209 of 376

Page 210

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 210 of 376

Page 211

LINE SERVICE  ACCOUNT ANNUAL PROVISIONAL
NO. BUDGET OUTTURN
(1) (2) (3) (4)
£      £      £     
1 Education, Children & Families 535,908,081               535,908,081              -                            
2 Early Years 35,271,836                35,271,836                -                            
3 Primary Schools 164,286,161               164,286,161              -                            
4 Secondary Schools 151,381,665               151,381,665              -                            
5 Special Schools 26,312,999                26,312,999                -                            
6 Education & Families Service Delivery 107,503,843               108,645,102              (1,141,259 )              
7 Childrens Services Social Work 40,648,963                40,150,811                498,152                  
8 Justice Services 91,690                       66,395                      25,295                    
10 Employability 3,015,086                  2,506,824                  508,262                  
11 Community Learning 5,393,767                  5,320,824                  72,943                    
12 Tackling Poverty 2,002,071                  1,965,464                  36,607                    
13 Enterprise & Communities 206,422,542               206,422,542              -                            
14 Assets & Procurement 37,514,575                37,674,038                (159,463 )                 
15 Trading Accounts (462,202 )                    (18,120 )                     (444,082 )                 
16 Community Operations 152,308,248               153,586,541              (1,278,293 )              
17 Housing Management 5,753,407                  4,688,089                  1,065,318               
18 Housing Property Services -                                -                               -                            
9 Active and Creative Communities -                                -                               -                            
19 Place 11,308,514                10,491,993                816,521                  
20 Chief Executives & Other Corporate Services 108,429,007               105,613,505              2,815,502               
21 Directorate & Support 529,177                     561,960                     (32,783 )                  
22 Finance 47,106,203                46,020,685                1,085,518               
23 Audit & Risk 597,041                     596,415                     626                        
24 Legal & Democratic 2,579,482                  2,305,053                  274,429                  
25 Business & Digital 23,484,284                21,548,077                1,936,207               
26 People Resources 8,933,567                  8,875,811                  57,756                    
27 Strategic Communication and Engagement 5,360,366                  5,344,366                  16,000                    
28 Other Corporate Services 6,284,817                  6,807,068                  (522,251 )                 
29 Joint Boards 13,554,070                13,554,070                -                            
30 Social Work (non Integrated) 211,469,816               211,469,816              -                            
31 GENERAL FUND SERVICES 1,062,229,446            1,059,413,944           2,815,502               
32 FINANCING COSTS (36,205,584 )               (39,205,584 )               3,000,000               
33 Reversal of Capital Charge (87,964,980 )               (87,964,980 )               -                            
34 Loan Charges and Interest on Revenue Balances 51,759,396                48,759,396                3,000,000               
35 OTHER BUDGETARY ISSUES (17,156,609 )               (18,171,419 )               1,014,810               
36 Assumptions not yet Realised 2,843,391                  1,828,581                  1,014,810               
37 Transfer from capital grant (Pay Award) (20,000,000 )               (20,000,000 )               -                            
38 TOTAL EXPENDITURE 1,008,867,253            1,002,036,941           6,830,312               
39 SOURCES OF FUNDING 1,008,867,253            1,008,867,253           -                            
40 Aggregate External Finance 834,321,788               834,321,788              -                            
41 Council Tax 168,999,465               168,999,465              -                            
42 Use of balances 5,546,000                  5,546,000                  -                            
43 FORECAST (SURPLUS)/DEFICIT: TO SUPPORT FUTURE
BUDGETS
-                            (6,830,312 )                 6,830,312               
44 HOUSING REVENUE ACCOUNT (SURPLUS) / DEFICIT -                                (2,300,000 )                 2,300,000               
45 ADULT HEALTH AND SOCIAL CARE (SURPLUS) /DEFICIT (1,396,574 )                 1,396,574               
Appendix  1
NORTH  LANARKSHIRE COUNCIL
SUMMARY BY DIVISION FOR PERIOD ENDING 03 January 2025 (PERIOD 10)
PROVISIONAL
VARIANCES
Page 211 of 376

Page 212

Appendix 2
2024/25 Future Years Total
Opening
Reserve
Balances 
2024/25
Revised
Earmarked
Reserve 
24/25
Projected
Spend 
Anticipated
Year End
Balance 
Anticipated
Future Year
Use 
No Longer
Required 
Profiled for
Future Years 
Anticipated
Future Year Use 
No Longer
Required 
No Longer
Required
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000 Check Future Years
Change Management Fund 19,358          2,645             2,645          -                   -                   -                16,713                16,713                -                -                    16,713         -           
Earmarked & One Off Resources
Schools Future Contractual Obligations 60,969          -                    -                 -                   -                   -                60,969                60,969                -                -                    60,969         -           
Strategic Workforce Planning 17,902          17,902           3,886          14,016           14,016           -                -                         -                         -                -                    -               -           
Temporary Teachers 823               823               823             -                   -                   -                -                         -                         -                -                    -               -           
Temporary Accommodation 8,038            8,038             -                 8,038            8,038            -                -                         -                         -                -                    -               -           
Early Years & Childcare Expansion 5,213            3,332             3,332          -                   -                   -                1,881                  1,881                  -                -                    1,881           -           
Refugee Resettlement Programmes 8,323            3,276             3,044          232               232               -                5,047                  5,047                  -                -                    5,047           -           
Loans Charges 17,905          -                    -                 -                   -                   -                17,905                17,905                -                -                    17,905         -           
Unmanaged burdens within Education, Children & Families 4,234            4,234             4,234          -                   -                   -                -                         -                         -                -                    -               -           
Pupil Equity Fund 2,153            2,153             2,153          -                   -                   -                -                         -                         -                -                    -               -           
Balances held by Schools under Devolved School Management 2,655            2,655             2,655          -                   -                   -                -                         -                         -                                    - -               -           
Economic Recovery 1,519            1,419             1,319          100               100               -                100                     100                     -                -                    100              -           
Whole Family Wellbeing 4,417            2,071             1,271          800               800               -                2,346                  2,346                  -                -                    2,346           -           
Winter Reserve 1,500            1,500             1,500          -                   -                   -                -                         -                         -                -                    -               -           
Business Gateway and Business Recovery 1,697            878               878             -                   -                   -                819                     819                     -                -                    819              -           
Strategic Capital Investment Programme 44,800          -                    -                 -                   -                   -                44,800                44,800                -                -                    44,800         -           
One Workforce Grading Pressures 5,000            5,000             -                 5,000            5,000            -                -                         -                         -                -                    -               -           
Digital NL 1,222            1,222             1,222          -                   -                   -                -                         -                         -                -                    -               -           
Mobilisation of Strategic Contracts 2,177            2,177             2,177          -                   -                   -                -                         -                         -                -                    -               -           
Shared prosperity Grants 1,753            1,753             1,753          -                   -                   -                -                         -                         -                -                    -               -           
Teacher Induction Scheme Support 1,302            1,302             307             995               995               -                -                         -                         -                -                    -               -           
Budget One-off Investment 8,119            8,119             6,901          1,218            1,218            -                -                         -                         -                -                    -               -           
Other Earmarked Funds 24,611          20,130           18,386         1,744            1,717            27             4,481                  4,481                  -                27                  4,481           -           
Earmarked & One Off Resources Total 226,332        87,984           55,841         32,143           32,116           27             138,348              138,348              -                27                  138,348        -           
Total Reserves 245,690        90,629           58,486         32,143           32,116           27             155,061              155,061              -            27                  155,061        -           
Contingency Reserve 8,000           
Non-Earmarked Balance; to support future budget challenges 30,203         
General Fund Surplus at 31 March 2024 283,893       
ANTICIPATED COMMITMENTS AGAINST EARMARKED RESERVES AS AT 03 January 2025 (PERIOD 10)
NORTH LANARKSHIRE COUNCIL
Page 212 of 376

Page 213

Appendix 3
£000 £000
Total Balance B/f per 2023/24 Annual Accounts 19,358 30,203
Period 10 reported variance 6,830
Earmarked Reserves no longer required 27
Total Balance 2024/25 before commitments 19,358 37,060
Revised one - off costs of approved savings (2,645)
Draw down from Capital Fund 2,951
Total Balance 2024/25;  to support future budget challenges 16,713 40,011
Known Commitments :- Revised one - off costs of approved savings (2,774)
Forecast Balance;  to support future budget challenges 13,939 40,011
NORTH  LANARKSHIRE COUNCIL
AVAILABILITY OF GENERAL FUND BALANCES AS AT 03 January 2025 (PERIOD 10)
Change Management
Fund
Non-Earmarked
General Fund
Page 213 of 376

Page 214

Page 214 of 376

Page 215

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    EK/PF Date 26/02/25 
Revenue Budget Monitoring Report; Chief Executive’s Service
01.04.24 – 03.01.25 (Period 10) 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail KempE@northlan.gov.uk Telephone 01698 302408 
Executive Summary
This report provides a summary of the Chief Executive’s Service financial performance for
the period 1 April 2024 to 3 January 2025 (Period 10).  The report illustrates the provisional
outturn as at 31 March 2025, with major outturn variances highlighted and explained per
the Council’s approved Financial Regulations. 
The Council approved its General Fund Revenue Budget on 15 February 2024, of which
£108.429m currently represents the net revenue budget for the Chief Executive’s Service.   
Incorporated within the revenue budget are approved service savings totalling £1.707m.   
The Service is currently projecting a year-end underspend of £2.816m for the financial year
predominately as a result of employee vacancies and underspends relating to ICT
contracts. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the financial position of the 2024/25 Chief Executive’s Service revenue
budget.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 16
Page 215 of 376

Page 216

1. Background 
1.1 The Council’s approved Financial Regulations require the Chief Executive to remain
within the approved budgetary provision, and to report all significant deviations -
defined as the higher of £100,000 or 5% - within budget monitoring reports. Where
significant deviations are identified, the Chief Executive must provide explanatory
commentary, outline the action required to rectify such deviations and where relevant,
must also highlight the impact this has on other budget headings. 
2. Report 
Summary of Financial Position 
2.1 The Council approved its General Fund Revenue Budget on 15 February 2024, of
which £104.746m (10.38%) represented the approved Revenue Budget for the Chief
Executive’s Service. Additional SG grant funding for Scottish Welfare Fund, Pay Award
uplifts and in-year transfers from Education, Children and Families results in a revised
budget of £108.429m. 
2.2 The overall projected outturn position of the Service is a year-end underspend of
£2.816m.  Appendices one to five provide further information in respect of this position. 
2.3 As at Period 10 the position on Council Tax Reduction Scheme remains under review
along with other elements of the Council Tax Product including household numbers and
council tax collection for the year.  The Council Tax Product will then be assessed for
expected credit losses as part of the year end process. It is currently anticipated there
will be no material variance overall.   
2.4 The 2024/25 budget incorporates £1.707m of savings which are listed in Appendix 5.  
Of this, £1.027m relates to service specific savings approved by Council in February
and these have been fully delivered through service restructures and a reduction in
operational budgets.  Furthermore, the historic underspend savings target of £0.680m
has also been fully achieved across the service. 
Analysis of Significant Variances 
2.5 The service currently anticipates a projected underspend of £1.589m within Employee
costs as a result of actual and projected vacancies to 31 March 2025.   
2.6 Costs in relation to the annual insurance premium coupled with building costs relating
to the Civic Centre has resulted in a projected overspend of £0.155m within Property
Costs. 
2.7 Within Supplies and Services the service is projecting a year end underspend of
£1.429m which represents savings within Business and Digital resulting from the
current usage levels of cloud-based systems. 
2.8 Transport & Plant is projected to underspend by £0.042m due to reduced travel claims
following the implementation of hybrid working and MOT plating. 
2.9 The service is now anticipating an underspend of £0.022m within Administration Costs
predominately due to expected credit losses, training and advertising costs offset by
increased costs for insurance premiums, legal fees as a result of the level of Solicitor
vacancies meaning external advice is required, consultant fees and postages. 
Page 216 of 376

Page 217

2.10 An under-recovery of £0.179m is projected predominately attributable to a forecast
reduction in PPP contributions, legal insurance, licensing and registrars offset by over-
recoveries within rental allowances / rent rebates overpayments, additional statutory
charges and interest. 
2.11 There are various minor variances across other budget areas resulting in the Service
forecasting a year-end underspend of £2.816m as at 31 March 2025. 
Earmarked and One-off Reserves 
2.12 In finalising the Council’s draft accounts to 31 March 2024, the service was given
approval to earmark £3.567m of resources to fund key projects and initiatives profiled
over a number of years.  It is anticipated that £2.383m of the reserves balances will be
utilised in 2024/25 with £1.162m required for future years and a balance of £0.022m to
be returned to reserves.  Details of the Service’s earmarked funds are provided in
Appendix 4.    
2.13 The Service has also been given approval to utilise £1.059m of funds from the
Corporate Strategic Workforce Planning Reserve over a number of years.  It is
anticipated £0.212m of this reserve will be utilised in 2024/25 with actual spend of
£0.117m at P10.  These funds are not included in the Service outturn position. 
2.14 The Service was further given approval to utilise £0.296m of funds from the Change
Management Fund over several years.  It is anticipated that £0.043m will be utilised in
2024/25 with actual spend of £0.017m at P10.  These funds are not included in the
Service outturn position. 
2.15 The Service has incurred £0.525m VRS costs relating to approved
savings/restructures.  Therefore, there is a requirement to utilise the Corporate Change
Management fund at this time.  Any further costs arising will be reported in future
reports as they are incurred.  These costs are not included in the Service outturn
position. 
2024/25 Budget Savings 
2.16 The Council approved service savings of £1.707m savings of which £1.707m have
been fully delivered as at Period 10.  Further information regarding savings is included
in Appendix 5. 
Management Actions 
2.17 The Service is being pro-active to ensure expenditure is contained within its approved
2024/25 budget. 
3. Measures of success 
3.1  The Service continues to operate within approved budget resources.   
4. Supporting documentation 
Appendix 1 Objective Summary 
Appendix 2 Subjective Summary 
Appendix 3 Payments to Other Bodies 
Appendix 4 Earmarked Reserves
Page 217 of 376

Page 218

Appendix 5 Budget Savings 
Elaine Kemp
Chief Officer (Finance) 
Page 218 of 376

Page 219

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
As stated in the main body of the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 219 of 376

Page 220

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All activities undertaken by the Council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy, Services manage these as part of
their overall corporate and service planning processes. The current economic
climate, in particular, has the potential to impact upon the Council’s ability to provide
quality services within approved budget levels. 
To minimise risk, this report has been prepared by service based Finance
personnel in consultation with budget managers, in accordance with the Financial
Regulations. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 220 of 376

Page 221

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 221 of 376

Page 222

APPENDIX 1
[1] [2] [3] [5] [6] [7]
DIRECTORATE & SUPPORT 529,177 561,960 (32,783) ADV (6.2%) 2,264 Overspend in Legal Fees as a result of seeking external advice due
to solicitor vacancies.
FINANCE 47,106,203 46,020,685 1,085,518 FAV 2.3% 971,930
Underspends due to vacancies and expected credit losses coupled
with an over-recovery in income relating to rent allowances / rent
rebates overpayments and additional statutory charges offset by
projected overspends in insurance premiums and postages.
AUDIT & RISK 597,041 596,415 626 FAV 0.1% (6,747) Minor
LEGAL & DEMOCRATIC
SOLUTIONS 2,579,482 2,305,053 274,429 FAV 10.6% 244,569
Underspends within employee costs and postages offset by an under-
recovery in income in relation to insurance, photocopying and
registrars.
BUSINESS & DIGITAL 23,484,284 21,548,077 1,936,207 FAV 8.2% 1,541,779 Underspends within ICT contracts linked to the timing of costs
associated with cloud based systems and vacancies.
PEOPLE RESOURCES 8,933,567 8,875,811 57,757 FAV 0.7% 57,757 Underspends within Employee Costs and training budgets.
STRATEGIC COMMUNICATIONS 5,360,366 5,344,366 16,000 FAV 0.3% 16,000 Underspends within Employee Costs and administration costs .
OTHER COPORATE SERVICES 6,284,817 6,807,068 (522,251) ADV (8.3%) (606,817)
Under-recovery in income within PPP Contributions coupled with
projected costs for byelections offset by underspendsfor NLP
Financial Guarantee and interest received.
JOINT BOARDS 13,554,070 13,554,070 0 0.0% 0 Balanced budget.
NET EXPENDITURE 108,429,007 105,613,504 2,815,503 FAV 2.6% 2,220,735
[4]
PERIOD
MOVEMENT ANALYSIS
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Objective Analysis
Period 10 (01 April 2024 - 03 January 2025)
A - Chief Executives Service
DIVISION OF SERVICE ANNUAL BUDGET PROJECTED
OUTTURN
PROJECTED OUTTURN
VARIANCE %
Page 222 of 376

Page 223

APPENDIX 2
[1] [2] [3] [5] [6] [7]
EMPLOYEE COSTS 43,579,487 41,990,522 1,588,965 FAV 3.7% 1,237,196 Underspends due to vacancies partially offset by overtime costs.
PROPERTY COSTS 1,847,693 2,003,048 (155,355) ADV (8.4%) 25,760 Assumed increased costs relating to the insurance premium coupled
with part year building costs relating to the Civic Centre.
SUPPLIES & SERVICES 10,733,758 9,304,923 1,428,835 FAV 13.3% 911,675 Underspends within ICT contracts linked to the timing of costs
associated with cloud based systems
TRANSPORT & PLANT 699,949 657,887 42,060 FAV 6.0% 9,589 Underspends within travel expenses due to hyrbrid working and MOT
plating.
ADMINISTRATION COSTS 8,158,852 8,137,055 21,797 FAV 0.3% 158,364
Projected expected credit losses, training and advertising costs offset
by assumed insurance premium increase, legal fees as a result of
using external advice due to the level of internal vacancies and
postages.
PAYMENTS TO OTHER BODIES 17,011,339 16,998,666 12,674 FAV 0.1% 43,114 Projected costs associated with by-elections and medical fees offset 
by agency fees.
TRANSFER PAYMENTS 108,757,069 108,757,069 0 0.0% 0
CAPITAL FINANCING COSTS 6,812,218 6,742,994 69,224 FAV 1.0% 0 Over-recovery of income re NLP Financial Guarantee.
REVENUE FINANCING COSTS 0 0 0 0.0% 0
OTHER EXPENDITURE 5,578,186 5,591,907 (13,721) ADV (0.3%) 0 Miscellaneous costs associated with the purchase of Cumbernauld
Shopping Centre.
TOTAL EXPENDITURE 203,178,550 200,184,070 2,994,481 FAV 1.5% 2,385,698
INCOME (94,749,543) (94,570,567) (178,976) ADV 0.2% (164,961)
Under-recovery in income within PPP Contributions, insurance,
photocopying and registrars offset by over-recoveries for Rent
Allowances / Rent Rebates Overpayments, Additional Statutory
Charges and interest.
NET EXPENDITURE 108,429,007 105,613,504 2,815,505 FAV 2.6% 2,220,737
[4]
PERIOD
MOVEMENT ANALYSIS
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Subjective Analysis
Period 10 (01 April 2024 - 03 January 2025)
A - Chief Executives Service
CATEGORY ANNUAL BUDGET PROJECTED
OUTTURN
PROJECTED OUTTURN
VARIANCE %
Page 223 of 376

Page 224

APPENDIX 3
[1] [2] [3] [5] [6] [7]
PAYMENTS TO OTHER BODIES GENERAL 669,475 679,475 (10,000) ADV (1.5%) 20,000 Projected costs associated with by-elections.
MEDICAL FEES 10,659 23,612 (12,953) ADV (121.5%) (6,947) Increased costs in relation to medical fees.
AGENCY FEES 71,686 41,686 30,000 FAV 41.9% 30,000 Lower than anticipated costs within Agency Fees.
TOWN TWINNING 0 0 0 0.0% 0
CHILDRENS PANEL 25,035 21,035 4,000 FAV 16.0% 0 Minor variance 
COSLA ANNUAL LEVY 195,000 193,434 1,566 FAV 0.8% 0 Minor variance 
COMMUNITY COUNCIL GRANTS 125,222 125,222 0 0.0% 0
GRANTS TO ORGANISATIONS 987,294 987,294 0 0.0% 0
EXTERNAL AUDIT FEE 679,389 679,389 0 0.0% 0
ELECTION PROVISION 0 0 0 0.0% 0
TOURISM - VISIT NORTH LANARKSHIRE 53,700 53,700 0 0.0% 0
SCOTTISH WELFARE FUND 4,120,844 4,120,844 0 0.0% 0
SUB-CONTRACTOR PAYMENTS 1,869 1,809 60 FAV 3.2% 60 Minor variance 
LOCAL TAX PAYPOINT COMMISSION 35,000 35,000 0 0.0% 0
COSLA MIGRATION SCOTLAND 150,000 150,000 0 0.0% 0
LANDS VALUATION CONTRIBUTION 1,814,004 1,814,004 0 0.0% 0
SPT CONTRIBUTION 5,472,132 5,472,132 0 0.0% 0
SPT CONCESSIONARY FARES CONTRIBUTION 579,419 579,419 0 0.0% 0
CUSTOMER FIRST CONTRIBUTION 2,700,000 2,700,000 0 0.0% 0
TOTAL EXPENDITURE 17,690,728 17,678,055 12,673 FAV 0.1% 43,113
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Payments to Other Bodies
Period 10 (01 April 2024 - 03 January 2025)
A - Chief Executives Service
CATEGORY ANNUAL BUDGET
[4]
PROJECTED OUT-TURN
VARIANCE
PROJECTED OUT-
TURN % PERIOD
MOVEMENT ANALYSIS
Page 224 of 376

Page 225

APPENDIX 4
Value %
Service Specific Earmarked Reserves:
Admin of Covid and Cost of Living related support scheme 11,919 0 11,919 11,919 11,919 100.0% 11,919
COL Grant 34,645 0 34,645 34,645 34,645 100.0% 34,645
Modern Apprentices 75,838 (18,959) 56,879 14,099 24,149 42.5% 32,730 24,149 Balance required to support ongoing commitments.
Insurance Premiums 812,876 0 812,876 812,876 812,876 100.0% 812,876
Digitisation 83,797 0 83,797 83,797 83,797 100.0% 83,797
B&D - Investment model replacement of funds 627,000 (168,382) 458,618 177,844 458,618 100.0% 458,618 Balance required to support ongoing commitments.
NLC10 posts 21,849 0 21,849 0 0 0.0% 21,849 0 Budget no longer required as project is now
complete.
NLC12 post 312,055 (251,905) 60,150 31,939 58,510 97.3% 1,640 58,510 Balance required to support ongoing commitments.
B&D - Backfill for EUC Infrastructure Team (Windows 11) 137,900 0 137,900 69,792 103,248 74.9% 34,652 103,248 Balance required to support ongoing commitments.
Learning Academy 100,000 0 100,000 59,171 100,000 100.0% 100,000
Construction Academy 228,000 0 228,000 0 99,979 43.9% 128,021 99,979 Balance required to support ongoing commitments.
CSH Recover NL 81,000 0 81,000 11,259 66,746 82.4% 14,254 66,746 Balance required to support ongoing commitments.
Recover NL CSH 2022/23 (Single Number) 457,861 (93,699) 364,162 0 0 0.0% 364,162 0 Balance required to support ongoing commitments.
Recover NL Grants 23,863 0 23,863 9,934 23,863 100.0% 23,863
Cost of Living (Comms) 35,372 0 35,372 15,435 35,372 100.0% 35,372 Balance required to support ongoing commitments.
Cumbernauld Community Grants (Antonine Centre) 225,000 0 225,000 0 225,000 100.0% 225,000
Grant award Programme 148,000 (54,000) 94,000 94,000 94,000 100.0% 94,000
Audit Fee 150,000 0 150,000 0 150,000 100.0% 150,000
TOTAL 3,566,975 (586,944) 2,980,030 1,426,710 2,382,723 80.0% 575,459 21,849 2,382,723
Reprofile to
Future Years
No Longer
Required
Reserves
Required In
Year
Commentary Regards Usage
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Status of Earmarked Reserves
Period 10 (01 April 2024 - 03 January 2025)
A - Chief Executives Service
FINANCIAL YEAR - 2023/24
DESCRIPTION OF EARMARKED RESOURCE Reserve
Allocation
Profiled in
Future Years
Approved
Reserve
Total
Spend to
Date
Projected Spend
Page 225 of 376

Page 226

APPENDIX 5
£000 £000 £000
01CEX Directorate & Support - Reivew of Support
Services 56 56 0
03CEX Directorate & Support 4 4 0
04CEX Finance (5%) 48 48 0
07CEX Legal & Democratic - Central Services (10%) 14 14 0
13CEXD Business & Digital - Reivew of Support Services 43 43 0
10CEX Business & Digital - Digital / Field Services -
Technical Support to Education & Families 92 92 0
11CEXD Business & Digital - DigitalNL (MS Licences) 200 200 0
12CEX Business & Digital - Technoclogy Solutions -
restructure and review of contracts 110 110 0
13CEX Business & Digital - Business Strategy 154 154 0
19CEX Strategic Communications & Engagement -
Corporate Communications 149 149 0
20CEX Strategic Communications & Engagement -
Communities 157 157 0
Historic Recurring Underspends 680 680 0
TOTAL 1,707 1,707 0
APPROVED SAVINGS
Ref. DESCRIPTION OF APPROVED SAVING Target Value Value
Deliverable Savings Gap Reasons for Savings Gap
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Savings
Period 10 (01 April 2024 - 03 January 2025)
A - Chief Executives Service
Page 226 of 376

Page 227

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    EK/GT/RM Date 26/02/25 
Capital Programme 2024/25 Monitoring Report 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail KempE@northlan.gov.uk Telephone 07939 280 601 
Executive Summary
The purpose of the report is to provide an update on the 2024/25 resources and
expenditure for the Council's Strategic Capital Investment Programme. The report shows
the 2024/25 projected outturn position and the resultant variances. 
It is currently anticipated that the General Fund programme will have a projected
programme expenditure variance of £13.467m, primarily due to the ongoing reassessment
of vehicle replacement programme requirements, timing delays within the Town and
Community Hub programme and the new Roads and Infrastructure contract and public
utilities works for City Deal projects within Enterprise and Communities. 
The HRA programme is currently anticipating that expenditure will be £1.302m lower
mainly due to the purchase of land being lower than previously projected, offset by a higher
level of abnormal costs being identified within the New Build programme, together with a
slight reduction in the number of projected acquisitions through the Mortgage to Rent
scheme within the Buy Back programme. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledges the provisional outturn financial position of the Council’s Strategic
Capital Investment Programme as at 3 January 2025. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 17
Page 227 of 376

Page 228

1. Background 
1.1 The Strategic Capital Investment Programme 2024/25 to 2028/29 was approved at
Policy and Strategy Committee in March 2024 and represents the total Community
Investment Programme incorporating the General Services Capital Programme and
HRA Capital Programmes.  The programme was developed in conjunction with
Services and led by the Strategic Capital Delivery Group (SCDG) using the principles
established by the Council’s Capital Strategy. 
1.2 The General Services Capital Programme supported by General Services resources
demonstrates to communities that the place making visions for towns remains a priority
and that the approved 5-year capital investment plan supports delivery of The Plan for
North Lanarkshire. The programme includes additional investment in Town and
Community Hubs, the City Deal programme, and external grant funding. 
1.3 In addition, the Housing Revenue Account (HRA) resources support several HRA
Capital Investment Programmes including the Mainstream programme for investment
in the Council’s existing estate and delivery of the ambition for 5,000 additional supply
through the New Build and Council Buy Back programmes. 
1.4 The 2024/2025 General Services Capital Programme is currently £139.922m with a
£111.291m investment programme in relation to the Housing Revenue Account. This
reflects the approved budget in March 2024 at Policy and Strategy Committee and
subsequent decisions made at the Strategic Capital Delivery Group (SCDG) in
accordance with the SCDG terms of reference, and where appropriate either by the
individual service committees, Finance and Resources Committee or the Policy and
Strategy Committee per the Scheme of Administration. Appendix 1 provides a
breakdown of the overall 2024/25 budget by Service Programme and associated
approved budget movements. 
2. Report 
Overall Council Strategic Capital Investment Programme 
2.1 The overall Council Strategic Capital Investment programme for 2024/25 and the
provisional outturn to 31 March 2025 is summarised in Table 1 as follows: 
Page 228 of 376

Page 229

2.2  On a budgeted programme of £251.213m expenditure is anticipated to be £14.769m 
lower than current programme at this stage of the financial year. Further financial 
performance information regarding each of the programmes is discussed in section 2.3 
and 2.20 below.   
General Services Capital Programme and Projected Outturn by Service/ Programme 
2.3 The forecast financial performance of the overall General Services Investment
programme at 31 March 2025 is detailed in Appendix 2 and summarised below. 
Community Capital Investment  Programme Summary 2024/25
Current
Programme
£000s
Projected
Outturn 
£000s
Outturn
Variance 
£000s
Enterprise & Communities 130,406 116,939 13,467
Chief Executives 7,345 7,345 0
Adult Health & Social Care 2,171 2,171 0
General Services: Total Capital Investment 139,922 126,455 13,467
General Services Resources:
General Fund
External Grants & Contributions 2023/24 35,784 35,784 0
External Grants & Contributions b/f 2022/23 7,203 7,203 0
External Grants & Contributions Unapplied (4,205) (4,205) 0
Net External Grants & Contributions 38,782 38,782 0
Advanced Developers Contributions 1,507 1,507 0
City Deal Grant 1,000 1,000 0
Capital Receipts 3,250 6,300 3,050
Capital Receipts -Transfer to Capital Fund 0 0 0
CFCR 24,987 24,987 0
General Services: Total Resources 69,526 72,576 3,050
General Services : Borrowing Requirement 70,396 53,879 (16,517)
HRA : Total Capital Investment 111,291 109,989 1,302
HRA Resources:
Net External Grants & Contributions 15,452 15,587 135
Capital Receipts 0 8 8
CFCR 20,089 20,089 0
HRA : Total Resources 35,541 35,684 143
HRA : Borrowing Requirement 75,750 74,305 (1,445)
Summary
Total Council : Capital Investment 251,213 236,444 14,769
Total Council : Resources 105,067 108,260 3,193
Total Council : Borrowing Requirement 146,146 128,184 (17,962)
Page 229 of 376

Page 230

General Services Total Resources 
2.4 The revised programme approved by the SCDG is £139.922m with total resources
available to meet the current programme forecast to be £69.526m, resulting in a
borrowing requirement of £70.396m. 
2.5 In 2024/25 net external grants and contributions of £38.782m will be utilised. This
capital resource primarily includes the Scottish Government (SG) General Capital
Grant receivable of £22.270m and other specific SG Grants including Vacant and
Derelict Land Fund (VDLF, £1.231m), Live Labs II (LLII £1.369m), Traffic Signals and
Road Safety Fund (TSRS, £2.434m) and Shared Prosperity Fund (SPF £1.406m). It
also includes contributions from other sources such as developer contributions of
£4.483m. In addition, capital grants received in 2023/24 have been added to the
programme to match expenditure in 2024/25 including £1.418m for VDLF, £1.841m for
PBIP, £1.875m for Regeneration Capital Grant Fund, £1.477m for Live Labs II and
£0.231m for Community Bus Fund. This has been offset by £4.205m of external grant
and contributions for Live Labs II (LLII £1.864m), VDLF (£1.549m), PBIP (£0.766m)
and the Scottish Wildlife Trust (£0.026m) which will not be applied in 2024/25 for
projects which will now not be completed until 2025/26.  
2.6 Receipts from the sale of assets are currently projected to be £6.300m, which is
£3.050m greater than the budget of £3.250m. These receipts will continue to be closely
monitored throughout the financial year. 
2.7 Whilst the approved 5-year capital programme had assumed phasing of known
utilisation of developer contributions, the accelerated timing of drawdown of these
contributions of an additional £1.507m during 2024/25 to match in-year expenditure
reduces the borrowing requirement for 2024/25 and will instead be required in the
2025/26 financial year. 
2.8 In addition, the approved 5-year capital programme had assumed phasing of City Deal
grant income with no receipt in 2024/25 forecast, accelerated timing of receipt of this
grant of £1.000m during 2024/25 results in a corresponding reduction in the borrowing
requirement for 2024/25 and will instead be required in the 2028/29 financial year. 
General Services Total Expenditure 
2.9 As indicated in Table 1 the General Services investment programme is £139.922m. At
Period 10, the provisional outturn spend is £13.467m lower than current programme.
Further analysis by service/programme is outlined below and summarised within
Appendix 2. 
2.10  Enterprise and Communities is projecting outturn expenditure of £116.939m, which
is a £13.467m variance from current programme. 
Within the Community Operations theme, the ongoing assessment of the Council’s
vehicle requirements has resulted in a positive in-year variance in the vehicle
replacement programme of £4.551m. In addition, the timing of the commencement of
the new Roads and Infrastructure contract has resulted in a positive variance of
£1.260m for the LED Infrastructure project.  Engagement with the new roads and
infrastructure provider to establish the delivery timescales are ongoing. Works at the
Pather Farm Cemetery project will now continue into the 2025/26 financial year with
works at Cambusnethan Cemetery being taken forward in the current financial year to
offset the variance. Within the Parks Masterplan theme, an in-year variance of £0.235m
in relation to Bothwellhaugh Cottage works has arisen due to design stage delays and
works will now span into 2025/26.
Page 230 of 376

Page 231

2.11 Within the Town and Community Hub theme, in-year expenditure on the St Kevin’s 
Community Hub project is now expected to result in a variance of £5.052m due to the 
requirement for additional pollution control testing and mitigation. These issues have 
now been resolved, and works are now underway. In addition, delays by Scottish Power 
in completing work to move an electricity sub-station prior to the pitch works taking 
place have resulted in a variance of £0.700m in relation to the grass pitch at Gartcosh. 
2.12 These are partially offset by cost increases within Assets & Procurement, where works 
have been accelerated within the Office Accommodation theme of £1.606m to support 
the needs of services. 
2.13 Within Maintaining Existing Assets a programme variance of £0.982m is projected, 
primarily due to an emerging issue within the Time Capsule for the water sports facility 
and lifts within the venue which have resulted in forecast additional costs of £0.633m 
this financial year. The Service is working with tender returns to decide on the package 
of works required and timing for these works. Within the theme, there have also been 
cost increases experienced on a major rewire project mainly linked to additional 
asbestos removal works of £0.963m but these have been offset by underspends on 
roofing works and the re-profiling of other works into next financial year. 
2.14 Additional unforeseen drainage works for two modular accommodation projects within 
Sustainable Estate theme and completion of the Heathery Park nursery project within 
the 1140 Early Learning and Childcare Expansion theme have resulted in cost 
increases of £0.291m and £0.201m respectively.  These increased budget 
requirements will be managed by the Service within their overall 5-year budget 
allocation.   
2.15 These cost increases will be partially offset by variances of £0.819m within the ASN 
theme linked to the Carnbroe and the Edward Lawson Centre projects which are now 
planned to complete in 2025/26 and £0.262m within Outdoor Education where works 
on three pitch replacements are now anticipated to be completed in April 2025. 
2.16 Within Place, it is anticipated that City Deal is now expecting a positive variance of 
£3.093m as a result of expenditure on public utilities works not expected to be incurred 
until early in the next financial year. This is partly offset by Economic Regeneration with 
an increase in costs of £0.374m, with £0.274m related to Braidhurst Industrial Estate 
however external funding is currently being sought to offset this, and a further £0.100m 
increase for Town Centre Fund which is being held in future years 2025/26. In addition, 
a delay in the award of the Roads and Infrastructure contract has meant that some 
works will not be complete until early 2025/26 resulting in a variance of £0.340m. 
2.17 Committed expenditure of £102.885m is currently reported, which represents 87.98% 
of the targeted expenditure, and actual expenditure is £68.134m which represents 
58.26% of targeted expenditure.   
2.18 Chief Executives is projecting outturn expenditure of £7.345m, which is on budget.
Committed expenditure of £5.276m is currently reported, which represents 71.83% of
the targeted expenditure. Actual expenditure is £3.716m, which is 50.59% of targeted
expenditure.   
2.19 Adult Health & Social Care is projecting outturn expenditure of £2.171m, which is on
budget. Committed expenditure of £1.462m is currently reported, which represents
67.34% of the targeted expenditure, and actual expenditure is £1.255m which is
57.81% of targeted expenditure. 
Page 231 of 376

Page 232

HRA Capital Investment 
2.20 The financial performance of the HRA Capital Programme is reported in detail to the
Housing Committee.  A summary of performance as at 3 January 2025 is provided at
Appendix 3. Total expenditure of £109.989m is forecast for 2024/25 which is a
reduction in programmed expenditure of £1.302m. This is primarily due to £1.182m of
lower than projected costs within the New Build programme relating to the purchase of
land, offset by a higher level of abnormal costs within the New Build programme. In
addition, a reduction in programmed expenditure of £0.120m is projected due to a slight
reduction in acquisitions through the Mortgage to Rent scheme, within the Buy Back
programme.  
2.21 Committed expenditure of £108.889m is currently reported, which represents 99.00%
of the targeted expenditure, and actual expenditure is £71.382m which is 64.90% of
targeted expenditure. 
3. Measures of success 
3.1  N/A   
4. Supporting documentation 
Appendix 1: Strategic Capital Investment Programme 2024/25 budget movements
Appendix 2: General Services Capital Investment Programme Summary 2024/25
Appendix 3: HRA Capital Investment Programme Summary 2024/25 
Elaine Kemp
Chief Officer (Finance) 
Page 232 of 376

Page 233

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The financial impact is outlined within the report
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒
Page 233 of 376

Page 234

If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Despite the updated programme approved at Policy and Strategy Committee in
March 2024 the capital programme continues to face challenges in relation to the
wider economic climate, linked to availability of materials, contractors and
inflationary pressures. These are currently being managed by services and Project
Boards associated with specific programme delivery and will continue to be
monitored throughout the year in accordance with the SCDG Terms of Reference
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 234 of 376

Page 235

2024/25 Strategic Capital Investment Programme – budget movements                                                                                         Appendix 1 
Enterprise &
Communities
Chief
Executives
Adult Health
&Social Care Corporate
Total General
Services
Investment
Programme
Total HRA
Investment
Programme
Total
Community
Investment
Programme
£000s £000s £000s £000s £000s £000s £000s
24/25 Opening programme approved Policy& Strategy Committee 1 March '24 99,161 5,589 2,200 450 107,400 115,291 222,691
23/24 Overs/Unders Carry Forward 15,802 4,506 (29) (37) 20,242 0 20,242
24/25 Budget adjustments approved by SCDG 872 0 0 (872) 0 0 0
Increase/(Decrease) in Externally Funded Projects 17,984 1,031 0 0 19,015 0 19,015
Increase/(Decrease) in Council Funded Projects (1,000) 0 0 0 (1,000) 0 (1,000)
Increase/(Decrease) in CFCR 3,614 0 0 0 3,614 0 3,614
24/25 Re-profiling of projects to future years approved by SCDG (6,027) (3,781) 0 459 (9,349) (4,000) (13,349)
Revised Capital Programme 2024/25 130,406 7,345 2,171 0 139,922 111,291 251,213
Page 235 of 376

Page 236

General Services Capital Investment Programme Summary 2024/25 - as at 31 March 2025 Appendix 2
Investment Current
Programme
2024/25
£000s
Projected
Outturn
2024/25
£000s
Outturn
Variance
2024/25
£000s
Committed
Expenditure
@ P10          
£000s
Committed
Expenditure  %
of Projected
Outturn
Actual
Expenditure 
@ P10      
£000s
Actual
Expenditure      
% of Projected
Outturn
Enterprise & Communities 130,406 116,939 13,467 102,885 87.98% 68,134 58.26%
Chief Executives 7,345 7,345 0 5,276 71.83% 3,716 50.59%
Adult Health & Social Care 2,171 2,171 0 1,462 67.34% 1,255 57.81%
Total General Services Investment 139,922 126,455 13,467 109,623 86.69% 73,105 57.81%
General Services Resources;
External Grants & Contributions 2024/25 35,784 35,784 0
External Grants & Contributions b/f 2023/24 7,203 7,203 0
External Grants & Contributions Unapplied cfwd to 2025/26 (4,205) (4,205) 0
Net External Grants & Contributions 38,782 38,782 0
Advanced Developers Contributions 1,507 1,507 0
City Deal Grant 1,000 1,000 0
CFCR 24,987 24,987 0
Capital Receipts 3,250 6,300 3,050
Total Resources  69,526 72,576 3,050
Borrowing Requirement: 
General Services 70,396 53,879 (16,517)
Total General Services Borrowing Requirement 70,396 53,879 (16,517)
Total Resources incl Borrowing Requirement 139,922 126,455 (13,467)
Page 236 of 376

Page 237

HRA Capital Investment Programme Summary 2024/25 - as at 31 March 2025 Appendix 3
Investment Current
Programme
2024/25
£000s
Projected
Outturn
2024/25
£000s
Outturn
Variance
2024/25
£000s
Committed
Expenditure
@ P10       
£000s
Committed
Expenditure      
% of Projected
Outturn
Actual
Expenditure
@ P10     
£000s
Actual
Expenditure      
% of
Projected
Outturn
Mainstream Programme 63,114 63,114 0 63,011 99.84% 40,597 64.32%
New Build Programme 35,541 34,359 1,182 34,359 100.00% 24,032 69.94%
Council Buy Back Scheme 12,636 12,516 120 11,519 92.03% 6,753 53.95%
Total HRA Investment 111,291 109,989 1,302 108,889 99.00% 71,382 64.90%
HRA Capital Resources;
External Grants & Contributions 15,452 15,587 135
External Grants & Contributions Unapplied 0 0 0
Net External Grants & Contributions 15,452 15,587 135
CFCR 20,089 20,089 0
Capital Receipts 0 8 8
Total Resources 35,541 35,684 143
Borrowing Requirement:
HRA - Mainstream 47,695 47,687 (8)
HRA - New Build 19,925 18,641 (1,284)
HRA - Buyback Scheme 8,130 7,977 (153)
Total Borrowing Requirement 75,750 74,305 (1,445)
Total Resources incl Borrowing Requirement 111,291 109,989 (1,302)
Page 237 of 376

Page 238

Page 238 of 376

Page 239

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    EK/PF Date 26/02/25 
Chief Executive Service – Capital Monitoring Report 1 April to 03
January 2025 (Period 10) 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail KempE@northlan.gov.uk Telephone 01698 302408 
Executive Summary
This report highlights the financial performance and projected outturn of 2024/25 Chief
Executive capital programme for the period ended 03 January 2025 (Period 10). 
In summary the Service has a total capital budget of £7.345m, comprising of £5.099m
within Business and Digital and £2.246m within Strategic Communications and
Engagement.  This budget reflects the budget approved by the Policy and Strategy
Committee in March 2024; balances carried forward from previous years subsequent
decisions made at the Strategic Capital Delivery Group (SCDG) in relation to reprofiling. 
The Service is currently projecting a break-even position at this stage of the financial year. 
Further explanation of management action taken by the Service is included within the main
report and attached appendices. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Considers the financial position of the 2024/25 Chief Executive capital programme.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 18
Page 239 of 376

Page 240

1. Background 
1.1 This report provides a summary of the Chief Executive Service financial performance
for the period 1 April 2024 to 3 January 2025 (Period 10), with major outturn variances
highlighted and explained per the Council’s approved Financial Regulations. 
1.2 The Council approved its Capital programme at Policy and Strategy Committee on 14
March 2024 with an allocated budget £6.620m for the current year.  In addition, carry
forwards from the previous year, Scottish Government funding for Play Areas and
decisions made at SCDG in relation to reprofiling have resulted in a revised Capital
Programme of £7.345m for the 2024/25 Financial Year as detailed in Appendix 1 of this
report. 
1.3 The Council’s approved Financial Regulations required the Chief Executive to remain
within his approved budgetary provision, and to report all significant deviations –
defined as the higher of £0.100m or 5% - within their budget monitoring reports.  Where
significant deviations were identified, Chief Officers must provide explanatory
commentary, outline the action required to rectify such deviations and where relevant,
must also highlight the impact this has on other budget headings. 
2. Report 
Summary of Financial Position 
2.1 The Service is projecting a break-even position for the financial year 2024/25 following
approval from SCDG to reprofile budgets into future years. Capital budgets and
expenditure are summarised in Appendix 1.   
Analysis of Significant Variances 
2.2 An explanation of variances within Business and Digital is detailed below: 
• Digitisation & Innovation
Following approval from SCDG to reprofile £0.200m due lower than anticipated
projects costs for Residual Connectivity, BI Hub and Centre of Excellence a break-
even position is now forecast. 
• Line of Business (LOB)
Similarly following approval to reprofile £0.853m due to due to supplier capacity to
deliver, changing requirements for the school area within Secure Access
programme and timing of works relating to Finance Transformation, the service is
now projecting a break-even position. 
• End User Devices (EUD) 
The service is currently projecting a break-even position. 
• Cyber 
The service is currently projecting a break-even position. 
• Capacity
Approval was given from SCDG to reprofile £0.085m due to timing of recruitment
resulting in the service is now projecting a break-even position. 
• Innovation
Page 240 of 376

Page 241

Approval was further given from SCDG to reprofile £0.080m due to timing of
recruitment resulting in the service is now projecting a break-even position. 
2.3 An explanation of the current position within Strategic Communications and
Engagement is detailed below: 
Following the recent reprofiling exercise of £0.760m due to the availability of suppliers
to deliver play projects by 31 March 2025, timing of committee approval for current year
projects, developers’ contributions to play areas and prioritisation of UKSPF funding to
support groups applying for a Community Asset Transfer, the service is projecting a
break-even position. 
Management Action 
2.4 The Service closely monitors all activities to ensure available budgets are maximised
whilst monitoring and actively managing the ongoing external challenges in delivery of
projects.  The Service continues to review the programme with updates being provided
to the SCDG and Committee. 
3. Measures of success 
3.1  The Service aim is to operate within approved budget resources over the term of the
capital programme. 
4. Supporting documentation  
Appendix 1 Summary Expenditure by Project / Theme 
Elaine Kemp
Chief Officer (Finance) 
Page 241 of 376

Page 242

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
As stated within the main body of the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 242 of 376

Page 243

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.9.1 All activities undertaken by the Council are subject to risk, and in
acknowledging the Council’s approved Risk Management Strategy, Services
manage these as part of their overall corporate and service planning
processes.  The current economic climate, in particular, has the potential to
impact upon the Council’s ability to provide quality services within approved
budget levels. 
5.9.2 To minimise risk this report was prepared by Finance personnel in
consultation with budget managers, in accordance with the Financial
Regulations. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 243 of 376

Page 244

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 244 of 376

Page 245

Appendix 1
Theme 
Budget
£
Actual
£
Committed
£
Uncommitted
£
Projected
Outturn
£
Outturn
variance
£
Digitisation & Innovation 2,638,431          1,464,866        1,545,355        1,093,076           2,638,431           -                        
Line of Business (LOB) System Portfolio 982,243             302,334           502,255           479,988              982,243              -                        
End User Device (Eud) Refresh 1,301,045          218,552           1,211,014        90,031                1,301,045           -                        
Cyber 114,000             -                       -                       114,000              114,000              -                        
Capacity 43,000               -                       43,000             -                          43,000                -                        
Innovation 20,000               -                       -                       20,000                20,000                -                         
TOTAL BUSINESS and DIGITAL 5,098,719          1,985,752        3,301,624        1,797,095           5,098,719           -                        
Community Board Project Investment Fund 2,146,220          1,730,692        1,974,763        171,457              2,146,220           0                       
Community Asset Transfers 100,000             -                       -                       100,000              100,000              -                         
TOTAL STRATEGIC COMMUNICATIONS and ENGAGEMENT 2,246,220          1,730,692        1,974,763        271,457              2,246,220           0                       
TOTAL CHIEF EXECUTIVES 7,344,939          3,716,445        5,276,387        2,068,552           7,344,939           0                       
Chief Executives Capital Programme 2024/25
Summary Expenditure by Thematic Categories
1st April 2024 - 3rd January 205 (Period 10)
YTD OUTTURN
Page 245 of 376

Page 246

Page 246 of 376

Page 247

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    EK/KS/RM/GM Date 26/02/25 
Treasury Management Monitoring Report for quarter ended 31
December 2024 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail McNameeR@northlan.gov.uk Telephone Ryan McNamee, Finance
Manager 
1. Background 
1.1 The Council manages its treasury activities in line with the CIPFA Code ‘Treasury
Management in the Public Services’. The Code requires the Council to produce reports
on its Treasury Management policies, practices and activities on a regular and ongoing
basis. The Council fulfils these obligations, in part, by the preparation of this Treasury
Management Monitoring report produced on a quarterly basis, encompassing a review
of performance. 
1.2 The Council’s “Treasury Management Strategy 2024/2025 and Treasury and
Prudential Indicators 2024/2025 to 2028/2029” was approved by Committee at its
meeting on 28 February 2024. The Treasury activity undertaken in the third quarter of
2024/25 reflects the key requirements of the Council’s 2024/25 Treasury Management
Strategy, with the Public Works Loan Board (PWLB) and Long-term Money Market
Executive Summary
This report fulfils the key requirements of the Council’s reporting procedures for Treasury
Management in accordance with the CIPFA Code of Practice on Treasury Management
and the CIPFA Prudential Code for Capital Finance in Local Authorities. It informs on the
quarterly Treasury Management activity for the period 1 October 2024 to 31 December
2024 and compliance with the mandatory treasury and prudential indicators.
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the Treasury Management Activity for the quarter ended 31
December 2024 including the performance against the key treasury and prudential
indicators.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 19
Page 247 of 376

Page 248

being the prime source of long-term funds. In terms of investment activity, this is
conducted in accordance with the approved 2024/25 investment strategy. 
2. Report 
Summary Position 
2.1 The net overall borrowing position to 31 December 2024 is £1,060.0m, which is an 
increase of £62.6m from the position at the 30 September 2024.  A detailed breakdown 
of the net cash movement is shown in column (6) within Appendix 1 and is discussed 
below.  
Borrowing 
2.2 At the end of the quarter, total external debt amounted to £1,130.3m, an increase of 
£81.2m. This was primarily due to additional net longer-term borrowing of £92.2m being 
undertaken, comprising new PWLB borrowing of £97.0m, partially offset by repayment 
of existing PWLB debt of £4.7m, and a £0.1m repayment in energy efficiency loans. 
2.3 During the quarter the Council sourced PWLB loans totalling £85.0m on an equal 
instalment payment (EIP) basis, which provides a smoother debt maturity profile, thus 
spreading the refinancing risk and £12.0m on an annuity basis for a 1-year loan 
replacing some temporary borrowing. Of this, £60.0m of the EIP loans were sourced at 
interest rates ranging from 4.36% to 4.39% over an eight year repayment period and 
were sourced taking advantage of the PWLB HRA rate (see para 2.5).  Further EIP 
borrowings of £25.0m were sourced at an interest rate of 4.87% over  a 10 year 
repayment period, and £12.0m annuity borrowings at interest rate of 5.15% for a 1-year 
period, both utilising certainty rate discount (see para 2.6). 
2.4 In addition, there was a decrease in net temporary borrowing of £9.0m, due to £79.0m 
falling due for repayment being offset by £70.0m of new borrowing.  There was also a 
£2.0m reduction in long term liabilities due to existing finance lease and Service 
Concessions obligations falling due for repayment. 
2.5 The Council’s approach to borrowing is in line with the approved strategy which aims 
to source long-term borrowing and take advantage of temporary (short-term) borrowing 
at attractive rates, and where possible, using internal cash balances, to meet the 
principal repayments, daily revenue account requirements and the capital financing 
requirement, in lieu of borrowing for capital purposes. The strategy adopted considers 
interest rate forecasts, the management of carrying costs and the retention of cash 
balances at appropriate levels, whilst managing the associated investment, interest, 
and liquidity risk. 
2.6 The Council made a successful application to the PWLB to access the certainty rate 
which allows a 20-basis point (bps) (0.20%) discount on loans from the PWLB under 
the prudential borrowing regime. This will continue to provide the Council with an 
opportunity to borrow from the PWLB at more beneficial rates until 30 April 2025.  
2.7 A new PWLB HRA rate, which is 0.40% below the certainty rate, has been available 
from 15th June 2023, which has been extended until March 2026 in the UK Budget in 
October, to support local authorities borrowing for Housing capital purposes or 
refinancing existing loans. In conjunction with our treasury advisors, we continue to 
review borrowing requirements and assess borrowing opportunities for the Council 
during 2024/25. 
Page 248 of 376

Page 249

2.8 The CIPFA Prudential Code stipulates that local authorities cannot borrow to invest 
primarily for financial return, deeming it imprudent to make investment or spending 
decisions which will increase the capital financing requirement resulting in new 
borrowing, unless it is directly and primarily related to the functions of the Council. The 
Council is compliant with this requirement.  Members should note also that PWLB loans 
are no longer available to local authorities planning to buy investment assets primarily 
for yield.   
2.9 Members will be aware interest rates have risen significantly over the past 2 years, 
increasing materially the cost of both short and long-term borrowing. In this quarter, the 
Bank of England reduced the base rate to 4.75% in November. It should be noted that 
the Council’s cost of short-term borrowing reduced slightly during the quarter, whilst the 
cost of short-term borrowing from other local authorities spiked to around 7% in late 
March 2024, primarily due a dearth of local authority lending/borrowing activity during 
that month.  As expected shorter-term rates reverted to a more market-consistent range 
and were generally around 5.00% to 5.5% through the quarter. Rising rates were seen 
towards the end of the period in the Local Authority to Local Authority market. The 
average rate on the Council’s short-term loans as at 31st December 2024 was 4.98%. 
2.10 After substantial rises in interest rates since 2021 many central banks have now begun 
to reduce their policy rates, albeit slowly. Gilt yields were volatile but have increased 
overall during the period. Much of the increase has been in response to market 
concerns that policies introduced by the Labour government will be inflationary and 
lead to higher  levels of government borrowing. The election of Donald Trump in the 
US in November is also expected to lead to inflationary trade policies. The PWLB 
certainty rate for 10-year maturity loans was 4.77% at the beginning of the period and 
5.40% at the end. The lowest available 10-year maturity rate was 4.74% and the highest 
was 5.44%. Rates for 20-year maturity loans ranged from 5.20% to 5.87% during the 
period, and 50-year maturity loans ranged from 5.06% to 5.69%. 
Debt Restructuring 
2.11 In conjunction with our Treasury advisors, we monitored the economic climate in 
relation to our financial targets and Treasury Management Strategy, for the quarter 
under review. The interest rates prevailing throughout the period resulted in no 
beneficial opportunities for debt restructuring/rescheduling of the existing PWLB debt 
portfolio arising. 
2.12 The Council continues to hold £3.0m of LOBO (Lender’s Option Borrower’s Option) 
loans where the lender has the option to propose an increase in the interest rate at set 
dates, following which the Authority has the option to either accept the new rate or to 
repay the  loan at no additional cost.  The rise in market interest rates increases the 
probability of LOBOs being called, however, no lender exercised their option during the 
quarter.    
2.13 Further reports regarding future activity will be presented to Committee as appropriate. 
Investments  
2.14 Treasury management investments arise from cash flows or treasury risk management 
activity, that results in balances being invested, until the cash is required for use in the 
course of business. 
2.15 At the end of the third quarter of 2024/25, the Council held total investments of £70.3m, 
which is a net increase of £18.6m in cash and cash equivalents, primarily due to a
Page 249 of 376

Page 250

£9.5m increase in short-term investments, reflecting maturing temporary investments 
of approximately £393.6m, and undertaking new short-term investments of £403.1m, 
and a movement in uncleared balances due to timing differences including cash in 
transit of £9.1m. See summary at Appendix 1, column 6. 
2.16 At quarter end the uncleared balances including cash in transit was £4.6m which is a 
net positive position, an increase of £9.5m compared to the position reported at the end 
of the previous quarter of net deficit position of £4.5m.  This primarily reflects the impact 
of the festive period close down, were no significant BACS payment runs fell due for 
clearance at the quarter end date. The balance at 31 December 2024 comprises £4.6m 
of net BACS credits outstanding due for clearance within 3 days of the quarter end 
date, cash in transit balance of £0.1m, partly offset by cheques unpresented of £0.1m. 
2.17 In line with the approved strategy to manage liquidity, the Council aims to maintain a 
minimum balance of £30.0m available on an overnight basis (instant access), ensuring 
a prudent level of funds is maintained to meet all service requirements. 
2.18 During the quarter, the MPC voted to reduce the Bank of England base rate by 0.25% 
to 4.75%, which resulted in short-dated cash rates also reducing, with rates ranging 
between 4.88% at the beginning of October to 4.64% at the end of December, a 
reduction of 0.24% for overnight/7-day maturities. There is little noticeable difference 
between the 7 day and 1-month SONIA (Sterling Overnight Rate) bid rates and 
generally available investment rates offered by financial institutions and money market 
funds. Despite this, the Council will endeavour to achieve good performance levels in 
investment activity. 
2.19 Overall the Treasury Management team continues to take a prudent approach to 
investing surplus funds in line with the approved 2024/25 Investment Strategy. Security 
of investment and ensuring sufficient liquidity are key investment criteria governing 
Council investment decisions. This approach is aligned to the prudent management of 
current commitments and future cash demands based on latest robust cashflow 
projections.  During the quarter, the rates on Debt Management Account Deposit 
Facility (DMADF) deposits ranged between 4.70% and 4.94% and money market rates 
between 4.65% and 4.99 %. 
2.20 However, as demonstrated by the liability benchmark reported at (xi) below and 
Appendix 3 attached, it is anticipated the Council will be a long-term borrower and 
therefore new treasury investments are primarily made to manage day-to-day cash 
flows using short-term low risk instruments. The existing portfolio of strategic pooled 
funds will be maintained to diversify risk into different sectors and boost investment 
income. 
Non-Treasury Management Investments 
2.21 During the quarter, repayments £0.01m were made in respect of third-party advances 
in connection with the Cumbernauld Academy DBFM and Greenfaulds DBFM. 
Interest Rate Movements & Other Economic Updates 
2.22 As outlined by our treasury management advisors, the Chancellor of the Exchequer 
delivered her Autumn Budget at the end of October. Based on the plans announced, 
the Office for Budget Responsibility reported they would provide a short-term boost to 
GDP growth before weakening it further out and push inflation higher over the medium-
term. This change to the economic and inflation outlook caused financial markets to 
readjust expectations of Bank of England (BoE) base rate and gilt yields higher. The
Page 250 of 376

Page 251

council’s treasury management advisor also revised its interest rate forecast upwards 
in November, with base rate expected to level out at 3.75%. 
2.23 UK annual Consumer Price Index (CPI) inflation remained above the Bank of England 
(BoE) 2% target in the later part of the period. The Office for National Statistics (ONS) 
reported headline consumer prices rose 2.6% in November 2024, up from 2.3% in the 
previous month and in line with expectations, but surprising fell to 2.5% in December. 
Core CPI also rose in November, but by more than expected, and remained elevated 
at 3.6% in November against a forecast of 3.5% and compared to 3.3% in the previous 
month. In December, Core CPI fell to 3.2%. While the focus remains on the upside risks 
to inflation arising from the Budget, the recent data perhaps suggests that business 
pricing power is weakening, which may ease some policymakers concerns around 
domestic inflation persistence. 
2.24 UK economy GDP registered no growth (0.0%) between July and September 2024 and 
0.4% between April and June 2024, a further downward revision from the 0.5% rate 
previously reported by the ONS. Of the monthly GDP figures, the economy was 
estimated to have contracted by 0.1% in October, following the same size decline in 
September. 
2.25 The labour market continued to loosen, but the ONS data still require treating with some 
caution. Recent figures reported the unemployment rate rose to 4.3% (3mth/year) in 
the three months to October 2024 and rose to 4.4% in November and economic 
inactivity fell to 21.7% in October. The ONS reported pay growth for the three-month 
period to October at 5.2% for both regular earnings (excluding bonuses) and for total 
earnings and increased further to 5.6% in November. 
2.26 The BoE’s Monetary Policy Committee (MPC) held base rate at 4.75% at its December 
2024 meeting, having reduced it to that level in November and following a previous 
25bp cut from the 5.25% peak at the August MPC meeting. At the December meeting, 
six Committee members voted to maintain base rate at 4.75% while three members 
preferred to reduce it to 4.50%. The meeting minutes suggested a reasonably dovish 
tilt to rates with the outlook for economic growth a concern among policymakers as the 
Bank downgraded its Q4 GDP forecast from 0.3% to 0.0%. 
2.27 The November Monetary Policy Report (MPR) showed the BoE expected GDP growth 
to pick up to around 1.75% (four-quarter GDP) in the early period of the forecast horizon 
before falling back. The impact from the government’s Autumn Budget pushed GDP 
higher in 2025 than was expected in the August MPR, before becoming weaker. The 
outlook for CPI inflation showed it rising above the MPC’s 2% target from 2024 into 
2025 and reaching around 2.75% by the middle of calendar 2025. Over the medium-
term, once the near-term pressures eased, inflation was expected to stabilise around 
the 2% target. The unemployment rate was expected to increase modestly, rising to 
around 4.5%, the assumed medium-term equilibrium unemployment rate, by the end 
of the forecast horizon. 
2.28 Our treasury management advisors maintain its central view that base rate would 
continue to fall from the 5.25% peak. From the first cut in August 2024, followed by the 
next in November which took base rate to 4.75%.  February 2025 is deemed the likely 
month for the next reduction, with other cuts following steadily in line with MPR months 
to take base rate down to around 3.75% by the end of 2025. 
2.29 In global terms, The US Federal Reserve continued cutting interest rates during the 
period, reducing the Fed Funds Rate by 0.25% at its December 2024 monetary policy 
meeting to a range of 4.25%-4.50%, marking the third consecutive reduction. Further
Page 251 of 376

Page 252

interest rate cuts are expected into 2025, but uncertainties around the potential 
inflationary impact of President Trump’s policies may muddy the waters in terms of the 
pace and magnitude of further rate reductions. Moreover, the US economy continues 
to expand at a decent pace, suggesting that monetary policy may need to remain more 
restrictive in the coming months than had previously been anticipated. The European 
Central Bank (ECB) also continued its rate cutting cycle, reducing its three key policy 
rates by 0.25% in December. Euro zone inflation rose above the ECB 2% target in 
November 2024, hitting 2.2% as was widely expected and a further increase from 2% 
in the previous month. Inflation is expected to rise further in the short term, but then fall 
back towards the 2% target during 2025, with the ECB remaining committed to 
maintaining rates at levels consistent with bringing inflation to target, but without 
suggesting a specific path. 
2.30 Financial market sentiment was generally positive over the period, but economic, 
financial and geopolitical issues meant the ongoing trend of bond yield volatility very 
much remained. In the last few months of the period, there was a general rising trend 
in yields due to upwardly revised interest rate and inflation expectations, causing gilt 
yields to end the period at substantially higher levels to where they began. 
2.31 Over the period, the 10-year UK benchmark gilt yield started at 3.94% and ended at a 
high of 4.60%. While the 20-year gilt started at 4.40%, ended at a high of at 5.08%. The 
Sterling Overnight Rate (SONIA) averaged 5.01% over the period to 31st December.   
2.32 Due to the cut in the base rate during the period, short-term borrowing interest rates 
reduced with the short term 7-day offer rate ranging between 4.81% and 5.09% over 
the period. Taking account of the increase in borrowing rates and advice from our 
treasury management advisors, it was considered more cost effective in the near term 
to use a  combination of internal resources or to borrow rolling temporary / short-term 
loans at lower interest rates where possible rather than long term borrowing. This will 
result in increased temporary borrowing costs for the Council partially offset by 
increased investment income earned on surplus balances. 
2.33 The Treasury Management Section will continue to monitor financial and economic 
policy and their impact upon the Council’s investment and borrowing activity. 
The Prudential Code for Capital Finance in Local Authorities 
2.34 The Local Government in Scotland Act 2003 requires the Council to undertake its 
Treasury activities in line with the Prudential Code for Capital Finance in Local 
Authorities. 
2.35 Committee, at its meeting on 28 February 2024, approved a report titled, “Treasury 
Management Strategy 2024/2025 and Treasury and Prudential Indicators 2024/2025 
to 2028/2029”. This report detailed a variety of mandatory and local indicators aimed 
at assisting members to determine that proposed capital investment levels and treasury 
management decisions satisfied the key requirements of affordability, prudence and 
sustainability. Performance against key prudential indicators for 2024/25 to date is 
detailed within Appendix 2. 
(i) Indicator 1(a) illustrates planned investment on capital expenditure is forecast to
be lower than initially anticipated by £72.8m in 2024/25. This reflects a reduction
of £26.7m in the General Fund capital investment and £46.0m for the HRA
Mainstream and New Build programmes.  For further information, this is
monitored in detail as part of the Council's capital programme reporting
Page 252 of 376

Page 253

mechanisms which will provide spend details including any revisions to the
estimates approved in 2024/25. 
(ii) The mix of resources required to finance the capital expenditure in 2024/25
reflects the updates on forecast capital investment. Therefore, the level of in-year
borrowing is anticipated to be lower by £84.5m due to a reduction in General
Fund programme requirements of £56.6m and £27.9m for HRA programme. This
forecast level of borrowing also reflects a net decrease in capital grants and
external contributions of £16.3m with decreased funds available to HRA
programmes of £18.1m partly offset by an increase in General Fund of £1.9m.
An increase of £25.0m in General Fund CFCR is also anticipated, primarily due
to one-off savings in employer pension costs in 2024/25 approved for capital
investment, and an increase in capital receipts of £3.1m. 
(iii) As a result of accounting issues arising from the pandemic recovery, the
implementation of IFRS 16 Lease Accounting was further delayed, but will be
implemented in 2024/25. Therefore, a restatement of existing liabilities for
operating leases to the credit arrangement category is estimated to have a £2.2m
impact. In addition, there is a subsequent impact of IFRS16 implementation on
Service Concessions liabilities in 2024/25.  The accounting impact is an
estimated increased capital investment of £93.9m (increase to capital financing
requirement) being recognised in the period to 2028/29.  It should be noted that
this is an accounting adjustment and does not represent cash expenditure, which
is offset by an equal and opposite recognition of associated credit arrangements
financing. 
(iv) Indicator 1(b) – The Council’s cumulative outstanding amount of debt finance is
measured by the capital financing requirement (CFR). The CFR is essentially a
measure of Council’s underlying borrowing need i.e. capital expenditure not
resourced by capital grants, receipts or CFCR, with any new borrowing increasing
the CFR. The CFR is projected to rise to £1,578.2m within financial year 2024/25. 
(v) The Prudential Code requires the Council’s capital investment to be prudent and
affordable. To demonstrate this, a Prudential Margin (the need to borrow versus
actual borrowing) is calculated. Indicator 1(c) demonstrates a healthy prudential
margin of £282.1m estimated as at 31 December 2024. The timing and profile of
external borrowing to replenish cash reserves and balances are being managed,
giving full consideration to liquidity, interest rate and refinancing risk, whilst
minimising the potential carrying costs. 
(vi) Indicator 1(d) illustrates that both the overall Authorised Limit and Operational
Boundary limits for borrowing and long-term liabilities have not been exceeded,
with the maximum borrowing undertaken within the period being well below the
approved boundaries. 
(vii) Indicator 1(e) illustrates the financing costs forecasts as at 31 December 2024
for both general fund and HRA as a proportion of net revenue stream. Although
capital expenditure is not charged directly to revenue, interest payable on loans,
and loan fund and long-term liability repayments are.  The net annual charge is
known as financing costs; this is compared to the net revenue stream i.e. the
amount funded from Council Tax, NDR and government grants. 
(viii) Indicator 2(a) highlights the proportion of external interest payable by the Council
which is fixed and variable over the term of the borrowing, and therefore the
Page 253 of 376

Page 254

exposure to the effects of interest rate changes. As at 31 December 2024, the
level of borrowing subject to variability is deemed to be within acceptable levels. 
(ix) Indicator 2(b) highlights a projected increase in loan charges of £2.2m compared
to the initial Treasury Management Strategy estimates for 2024/25. This
projection takes into account treasury management activity, internal Interest on
Revenue Balances (IORB) recharges due to increased market interest rates, the
loans fund holiday flexibility adopted in 2022/23 and decisions of the Policy and
Strategy Committee and the Strategic Capital Delivery Group to approve and
reprofile the new capital programme for the period 2024/25 to 2028/29 based on
current programme delivery plans. However, it should be noted that due to
significant uncertainty and volatility within market conditions that there is a
material risk of movement in applicable interest rates impacting IORB recharges. 
When applied to the high levels of balances held by the Council, this could lead
to a significant movement in the level of financing costs expected.  A review has
been undertaken to model the potential impact of any changes and has been
incorporated within this report and will continue to be reviewed throughout the
year with further updates to be provided to members in future reports. This current
loan charge variance is made up of: 
• A net treasury management interest and expenses increased spend of £2.4m
is projected (£0.2m General Fund, HRA £2.0m), which is a primarily a reflection
of increased internal IORB charges, and incorporates cashflow management
techniques adopted, e.g. directing the timing of new borrowing, managing
investment security, liquidity and interest rate risk.  
• In 2024/25 it is anticipated there will be a minor reduction in anticipated loans
fund advance repayments of £0.4m (£0.2m General Fund, HRA £0.2m). This
is primarily due to revised average loan pool rates from previously forecast. 
(x) Indicator 2(c) relates to the level of fixed debt due to mature within time periods. 
The level of debt maturing remains within the upper limits set for each category
at the beginning of the financial year. 
(xi) The Liability Benchmark at Appendix 3.  The Treasury Management Code states
that organisations should evaluate the amount, timing and maturities needed for
new borrowing in relation to planned borrowing needs, in order to avoid borrowing
too much, too little, too long or too short. The liability benchmark is an important
tool to help establish whether the Council is likely to be a long-term borrower or
long-term investor in the future, and so shapes its strategic focus and decision
making. Essentially this benchmark identifies the projection of external
debt/borrowing required over the long term to fund approved revenue & capital
budgets, while keeping treasury investments at the minimum level required to
manage day-to-day cash. 
(xii) This represents the comparison of the Council’s actual borrowing against an
alternative strategy. This utilises the forecasts for Capital Financing Requirement,
long-term liabilities, current external borrowing, balance sheet resources i.e.
reserves, and that cash and investment balances are kept to a minimum of
£30.0m at each year-end to maintain sufficient liquidity but minimise credit risk. 
Page 254 of 376

Page 255

(xiii) The Loans CFR (solid light blue) represents the total cost of the capital
expenditure plans based on the estimated current profile of the 5-year Capital
Programme 2024/2025 to 2028/2029 as approved by Policy & Strategy
Committee on 14th March 2024.  This reduces over time as scheduled principal
repayments are made to the loans fund. The Net Loans Requirement (dotted red
line) represents the minimum external borrowing required to fund the current
capital expenditure plans assuming all cash reserves and balances are utilised
to offset borrowing requirements.  The Liability Benchmark (solid red line)
represents the estimated borrowing required, taken account of liquidity allowance
required of £30.0m to be held to maintain liquidity and to manage day-to-day
cashflows. 
(xiv) The solid grey section shows the maturity profile of current borrowing.  The gap
between the grey section and the liability benchmark line represents the
estimated additional borrowing that is forecast will be required to fund the current
capital expenditure plans, via long-term and short-term borrowing options. 
3. Measures of success 
3.1  Overall the approach adopted by the Council’s Treasury Management team during the
quarter under review met the key requirements of the 2024/25 Treasury Management
Strategy. Prudential indicators have remained in accordance with those approved by
Committee on 28 February 2024. The projected final outturn illustrates a healthy
prudential margin and borrowing levels that are below sustainable limits, ensuring that
the projected capital investment levels remain affordable and sustainable. However,
the current financial volatility and increased borrowing costs has resulted in an
assessment being undertaken of the potential impact on future years of the current
capital programme.  This will continue to be monitored to determine if any further review
of the programme is required to ensure that it remains sustainably affordable. 
4. Supporting documentation 
Appendix 1:  Loans, Long term Liabilities & Investments as at 31 December 2024. 
Appendix 2:  Summary of Treasury and Prudential Indicators as at quarter ended 31   
December 2024. 
Appendix 3: Liability Benchmark as at quarter ended 31 December 2024. 
Elaine Kemp
Chief Officer (Finance) 
31/3/24
Actual
£m
31/3/25
Forecast
£m
31/3/26
Forecast
£m
31/3/27
Forecast
£m
31/3/28
Forecast
£m
31/3/29
Forecast
£m
Loans CFR 1,175.8 1,284.2 1,499.1 1,714.3 1,855.8 2,027.4
less Balance Sheet Resources (369.5) (368.1) (326.3) (309.4) (250.3) (237.9)
Net Loans Requirement 806.3 916.2 1,172.8 1,405.0 1,605.5 1,789.5
plus: Liquidity Allowance 30.0 30.0 30.0 30.0 30.0 30.0
Liability Benchmark 836.3 946.2 1,202.8 1,435.0 1,635.5 1,819.5
Existing Borrowing 866.9 872.1 628.7 577.6 533.2 493.0
New Borrowing Required 0.0 74.1 574.1 857.4 1,102.2 1,326.5
Page 255 of 376

Page 256

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Financial impacts are outlined within the report.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 256 of 376

Page 257

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
As the Council borrows and invests significant sums of money it is exposed to
financial risks including the loss of invested funds and the revenue effect of
changing interest rates. Therefore, successful identification, monitoring and control
of risk remains central to the Council’s treasury management strategy. 
Treasury Management activity by its very nature has a number of inherent risks
including interest rate, liquidity and refinancing risks. To minimise risk for its
treasury management activities the Council adopts and operates in accordance
with the guidelines for best practice prescribed within the CIPFA “Treasury
Management in the Public Services” Code of Practice and the CIPFA Prudential
Code for Capital Finance in Local Authorities. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 257 of 376

Page 258

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 258 of 376

Page 259

LOANS, LONG TERM LIABILITIES & INVESTMENTS AS AT 31 DECEMBER 2024                                                              Appendix 1
DEBT RESTRUCTURING   
BALANCE        
1-October-24
EARLY
REDEMPTION REFINANCING
NEW
BORROWING /
LONG-TERM
LIABILITIES
PRINCIPAL
REPAYMENTS
NET CASH
MOVEMENTS
BALANCE
31-December-24
(1) (2) (3) (4) (5) (6) (7)
LONG-TERM LOANS
PWLB 547,974,632 0 0 97,000,000 (4,690,915) 92,309,085 640,283,717
MONEY MARKET LOANS 54,000,000 0 0 0 0 0 54,000,000
LOBO 3,000,000 0 0 0 0 0 3,000,000
ENERGY EFFICIENCY LOAN 605,548 0 0 0 (98,006) (98,006) 507,542
605,580,180 0 0 97,000,000 (4,788,921) 92,211,079 697,791,258.79
SHORT-TERM LOANS
TEMPORARY 239,000,000 0 0 70,000,000 (79,000,000) (9,000,000) 230,000,000
MUNICIPAL BANK 0 0 0 0 0 0 0
INTERNAL LOANS 6,280 0 0 0 0 0 6,280
239,006,280 0 0 70,000,000 (79,000,000) (9,000,000) 230,006,280
LONG -TERM LIABILITIES
FINANCE LEASE OBLIGATIONS 1,055,925 0 0 0 0 0 1,055,925
LONG TERM LIABILITY 203,418,224 0 0 0 (1,992,769) (1,992,769) 201,425,455
204,474,148 0 0 0 (1,992,769) (1,992,769) 202,481,379
TOTAL EXTERNAL DEBT 1,049,060,608 0 0 167,000,000 (85,781,690) 81,218,310 1,130,278,918
INVESTMENTS
THIRD PARTY ADVANCES 1,146,829 0 0 0 (11,562) (11,562) 1,135,267
BANKS & OTHER FINANCIAL INSTITUTIONS 54,990,062.67 0 0 0 0 9,538,469 64,528,532
UNCLEARED BALANCES INCL CASH IN TRANSIT (4,456,491) 0 0 0 0 9,069,062 4,612,570
CASH & CASH EQUIVALENTS 51,680,401 0 0 0 (11,562) 18,595,969 70,276,369
NET BORROWING 997,380,208 0 0 167,000,000 85,770,128 62,622,341 1,060,002,549
Page 259 of 376

Page 260

Appendix 2  
Summary of Treasury and Prudential Indicators as at quarter ended 31 March 2025
1. Prudential Indicators
(a) Capital Expenditure Initial
Estimate
2024/2025
(£m)
Projected 
Outturn 
2024/2025 
(£m)
Variance
2024/2025
(£m)
Forecast 
2025/2026 
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
Capital Expenditure: General Services 156.5 129.8 (26.7) 177.0 139.6 87.1 153.2
Capital Expenditure: HRA 155.8 109.8 (46.0) 167.8 173.6 153.6 131.1
Total spend : Capital Expenditure 312.3 239.6 (72.7) 344.8 313.2 240.7 284.3
Total spend : Credit Arrangement 88.7 88.6 (0.1) 0.3 1.0 2.1 4.1
Total Capital Investment 401.0 328.2 (72.8) 345.1 314.2 242.8 288.4
Financed By:     
Capital Grants & Other External Contributions 72.1 55.8 (16.3) 55.0 44.9 44.6 52.0
Capital from Current Revenue 20.1 45.1 25.0 43.5 20.1 20.1 20.1
Capital receipts 3.3 6.4 3.1 5.0 3.0 1.5 4.0
Capital receipts transfer to Capital Fund 0.0 0.0 0.0 0.0 0.0 0.0 0.0
CFR : Borrowing - General Services 114.8 58.2 (56.6) 110.5 108.7 58.1 114.3
CFR : Borrowing - HRA 102.0 74.1 (27.9) 130.8 136.5 116.4 93.9
Credit Arrangements 88.7 88.6 (0.1) 0.3 1.0 2.1 4.1
(b) Capital Financing Requirement (CFR) Initial
Estimate
2024/2025
(£m)
Projected 
Outturn 
2024/2025 
(£m)
Variance
2024/2025
(£m)
Forecast 
2025/2026 
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
General Services 1,081.8 1,008.6 (73.2) 1,104.0 1,196.6 1,237.9 1,336.0
HRA 603.8 569.6 (34.2) 685.9 806.1 904.8 978.8
Total CFR 1,685.6 1,578.2 (107.4) 1,789.9 2,002.7 2,142.7 2,314.8
Movement in CFR 276.6 169.2 211.7 212.8 140.0 172.1
(c) Gross Debt and the Capital Financing Requirement Initial
Estimate
2024/2025
(£m)
Projected 
Outturn 
2024/2025 
(£m)
Variance
2024/2025
(£m)
Forecast 
2025/2026 
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
Gross Borrowing : Loan Debt 1,147.1 1,002.1 (145.0) 1,258.7 1,491.1 1,691.7 1,882.1
Long-term Liabilites 293.0 294.0 1.0 290.9 288.4 287.0 287.4
Gross Debt 1,440.1 1,296.1 (144.0) 1,549.6 1,779.5 1,978.7 2,169.5
Capital Financing Requirement 1,685.6 1,578.2 (107.4) 1,789.9 2,002.7 2,142.7 2,314.8
Prudential Margin 245.5 282.1 36.6 240.3 223.2 164.0 145.3
Page 260 of 376

Page 261

Appendix 2 (cont) 
Summary of Treasury and Prudential Indicators as at quarter ended 31 March 2025
1. Prudential Indicators
(d) Authorised Limit and Operational Boundary Initial
Authorised
Limit
2024/2025
(£m)
Initial
Operational
Boundary
2024/2025
(£m)
Maximum
Borrowing
Level Q2
2024/2025
(£m)
Borrowing 1,515.0 1,465.0 855.8
Other Long-term Liabilities 340.0 340.0 202.5
Total Debt 1,855.0 1,805.0 1,058.3
(e) Proportion of Financing Costs to Net Revenue Stream
Initial
Estimate
2024/2025
(£m)
Projected 
Outturn 
2024/2025 
(£m)
Variance
2024/2025
(£m)
Forecast 
2025/2026 
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
General Fund Loan Charges 49.8 43.7 (6.1) 47.4 54.4 61.8 67.2
General Fund Finance Lease/PPP Costs 15.3 19.7 4.4 19.3 20.3 20.2 20.7
General Fund : Capital Financing Costs 65.1 63.4 (1.7) 66.7 74.7 82.0 87.9
General Fund : Net Revenue Stream 988.8 990.3 1.5 988.8 988.8 988.8 988.8
Proportion of Financing Costs to Net Revenue Stream - GF 6.6% 6.4% (0.2%) 6.7% 7.6% 8.3% 8.9%
Proportion of Financing Costs to Net Revenue Stream
Initial
Estimate
2024/2025
(£m)
Projected 
Outturn 
2024/2025 
(£m)
Variance
2024/2025
(£m)
Forecast 
2025/2026 
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
HRA Loan Charges 42.8 39.1 (3.7) 43.9 51.7 59.7 68.4
HRA Finance Lease/PPP Costs 0.3 0.3 0.0 0.3 0.3 0.3 0.3
HRA : Capital Financing Costs 43.1 39.4 (3.7) 44.2 52.0 60.0 68.7
HRA : Net Revenue Stream 167.1 160.5 (6.6) 167.1 175.8 186.0 196.3
Proportion of Financing Costs to Net Revenue Stream - HRA 25.8% 24.5% (1.2%) 26.5% 29.6% 32.3% 35.0%
Page 261 of 376

Page 262

Appendix 2 (cont) 
Summary of Treasury and Prudential Indicators as at quarter ended 31 March 2025
2. Treasury Management Indicators
a) Interest Rate Exposures on External Interest Payments Position as at
31/12/2024
(£m) %
External Interest Payable on Fixed Rate Loan Debt 38.6 99.2%
External Interest Payable on Variable Rate Loan Debt 0.3 0.8%
b) Loans Fund Revenue Account Initial
Estimate
2024/2025
(£m)
Projected 
Outturn 
2024/2025 
(£m)
Variance
2024/2025
(£m) %age
Loans Fund Interest Payments 58.2 60.6 (2.4) (4.1%)
Loans Fund Expenses 0.4 0.4 0.0 0.0%
Total Loans Interest Payments & Expenses 58.6 61.0 (2.4) (4.1%)
Loans Funds Investment Income (1.9) (2.1) 0.2 (10.5%)
Total Loans Fund Interest Payments Investment Income & Expenses 56.7 58.9 (2.2) (3.9%)
Allocated as follows :
Loans Fund Interest Payments Investment Income & Expenses:General Fund 32.4 32.6 (0.2) (0.6%)
Loans Fund Interest Payments Investment Income & Expenses:HRA 24.3 26.3 (2.0) (8.2%)
Capital Advances Repayments -  General Fund 11.3 11.1 0.2 1.8%
Capital Advances Repayments -  HRA 13.0 12.8 0.2 1.5%
Total Capital Advances 24.3 23.9 0.4 1.6%
Total Loan Charges 81.0 82.8 (1.8) (2.2%)
c) Maturity Structure of Borrowing
<12months
12 months to
2 years 2 to 5 years 5 to 10 years
10 to 20
years
20 to 40
years >40 years
Upper Limit maturing :Fixed & Variable Rate Debt 15.0% 15.0% 25.0% 30.0% 35.0% 45.0% 30.0%
Lower Limit maturing :Fixed & Variable Rate Debt 0.0% 0.0% 5.0% 5.0% 5.0% 10.0% 10.0%
Maturity structure at the start of Q3 5.9% 7.1% 15.6% 26.1% 13.6% 27.4% 4.3%
Maturity structure at the end of  Q3 8.4% 7.3% 17.8% 27.6% 11.3% 23.8% 3.7%   
Page 262 of 376

Page 263

Appendix 3 
0
500
1,000
1,500
2,000
2,500
2024 2026 2028 2030 2032 2034 2036 2038 2040 2042 2044 2046 2048 2050 2052 2054
£m
Liability Benchmark - North Lanarkshire
Fixed rate loans LOBO loans Loans CFR Liability benchmark Net loans requirement
Page 263 of 376

Page 264

Page 264 of 376

Page 265

North Lanarkshire Council
Report
Finance & Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    EK/KS/RM Date 26/02/25 
Treasury Management Strategy 2025/2026
Treasury Management and Prudential Indicators 2025/2026 to
2029/2030 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail KempE@northlan.gov.uk Telephone 07939 280 601 
1. Background 
1.1 Each year, in line with the Code of Practice, the Council approves a Treasury
Management Strategy. This report updates the strategy for year 2025/2026. 
Executive Summary
This report fulfils the key requirements of the Local Government Act 2003 to: 
• Outline the Treasury Management Strategy for 2025/2026 in accordance with
the CIPFA Code of Practice on Treasury Management. 
• Report on the treasury and prudential indicators as required by the above code
and the CIPFA Prudential Code for Capital Finance in Local Authorities. 
Recommendations
It is recommended that the Finance & Resources Committee: 
(1) Approves the Treasury Management Strategy 2025/2026 and adopts the Treasury
Management and Prudential Indicators for 2025/2026 to 2029/2030, set out within
Appendix 1 to this report. 
(2) Remits the Treasury Management Strategy 2025/2026 to the Council for approval. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 20
Page 265 of 376

Page 266

1.2 In addition, the Treasury Management Strategy outlines the Prudential and Treasury
Indicators, which are monitored on a regular basis to demonstrate that the Council’s
investment plans are managed within a sound financial environment.    
1.3 This strategy continues to emphasise, under the revised Code of Practice, an enhanced
role for members in terms of accountability and awareness. The Finance & Resources
Committee is responsible for the development of the strategy, its implementation and
monitoring, while the Audit and Scrutiny Panel has a specified role in the effective
scrutiny, as part of its work on reviewing the internal financial controls of the Council. 
1.4 The report also reflects The Local Government Investments (Scotland) Regulations 2010
which were enacted from 1 April 2010 containing a requirement for the annual investment
strategy and annual investment report to be approved by the full Council and not
delegated to a committee or sub-committee. As a result, this strategy, if endorsed by
committee, should be remitted to the Council for approval. 
2. Report 
2.1 The strategy fully detailed within Appendix 1 covers the:
• debt and investment projections 
• outlook in interest rates
• borrowing and investment strategies
• treasury management performance measures
• policy on repayment of loans funds advances
• treasury management/prudential indicators. 
2.2  The requirements of the Local Government Investments (Scotland) Regulations 2010
have been incorporated within the 2025/2026 Strategy. 
2.3 The introduction of the Prudential Code for Capital Finance in Local Authorities in April
2004 brought about a change to capital spending controls, giving councils the freedom
to invest in capital projects without the limitation of legislative controls, provided their
programmes can be shown to be prudent, affordable, and sustainable. 
2.4 This report builds on this framework outlining the Council’s prudential and treasury
management indicators for 2025/2065 to 2029/2030. The key mandatory indicators
required by both the Treasury Management Code and the Prudential Code are illustrated
for these years and, along with local indicators, with a view to more fully informing the
decision-making process.   
2.5  Members should note that the forecasts contained within this report are indicative, as per
the 5-year Strategic Capital Investment Programme 2024/25 to 2028/29 approved by the
Policy and Strategy Committee on 14 March 2024, and reviewed on a continual basis by
the Strategic Capital Delivery Group (SCDG) including re-profiling adjustments within the
5-year programme. It should be noted therefore that the estimates presented within this
report are based on the current forecasts of the progression of the programme and
projected resources available.  The financial implications of implementing this plan will
be accounted for in the Council’s Medium Term Financial Planning assumptions. 
2.6 Material changes to the estimates/forecasts provided within this strategy and prudential
indicators will be reported during the quarterly Treasury Management monitoring process
and future annual updates to the Treasury Management Strategy. 
Page 266 of 376

Page 267

3. Measures of success 
3.1 The Treasury Management Strategy and the Prudential/Treasury Management
indicators illustrated in Appendix 1, provide members with assurance that the key
objectives of the Prudential Framework (i.e. prudence and affordability) will be satisfied,
and the inherent risks of Treasury Management risks will be controlled effectively and
efficiently, providing value for money.  When taken together, the indicators illustrate that
the proposed capital investment plans for 2025/2026 onwards are prudent and
affordable.  Healthy prudential margins from 2025/2026 onwards justify the investment
levels, the cost or affordability of which is contained within the existing financial
management strategies.   
4. Supporting documentation 
Appendix 1: Treasury Management Strategy 2025/2026 and the Treasury Management
and Prudential Indicators for 2025/2026 to 2029/2030. 
Elaine Kemp
Chief Officer (Finance) 
Page 267 of 376

Page 268

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
All financial impacts are contained withing the body of the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 268 of 376

Page 269

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Treasury Management activity by its very nature has a number of inherent risks
including interest rate, liquidity and refinancing risks. To minimise risk for its
treasury management activities the Council adopts and operates in accordance
with the guidelines for best practice prescribed within the CIPFA “Treasury
Management in the Public Services” Code of Practice and the CIPFA Prudential
Code for Capital Finance in Local Authorities. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 269 of 376

Page 270

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 270 of 376

Page 271

Appendix 1   
Treasury Management Strategy
2025/2026
& 
Treasury Management Indicators
& Prudential Indicators 
2025/2026 to 2029/2030
Page 271 of 376

Page 272

Appendix 1 
Index 
1.  Introduction 
2. Annual Borrowing Requirement 2025/2026 
3. Outlook for Interest Rates 
4. Annual Borrowing Strategy 2025/2026 
5. Annual Investment Strategy 2025/2026 
6. Performance Measurement Indicators and Benchmarking 
7. Treasury Management Indicators 2025/2026 to 2029/2030 
8. Prudential Indicators 2025/2026 to 2029/2030 
9. Policy on Repayment of Loans Fund Advances 2025/2026
Annex A: Treasury Management Policy Statement and  
Clauses adopted   
Annex B: Explanation of Long-term Rating Definitions 
Annex C: Permitted Investments, Associated Controls Credit
Rating, Money and Time Limits
Annex D: Interest Rate Forecast March 2025 until December
2027
Annex E: Sensitivity Analysis of Prudential Indicators:   
Affordability 2025/2026 to 2029/2030 
Annex F:  Loans Fund Repayment Schedule 
Page 272 of 376

Page 273

Appendix 1 
Treasury Management Strategy 2025/2026, Treasury Management Indicators and  
Prudential Indicators 2025/2026 to 2028/2029 
1. Introduction
1.1 Treasury Management (TM) deals with the borrowing and investment activity of the Council and 
is an integral part of the financial management strategy of the Council. It seeks to ensure that
both capital borrowing requirements and day to day revenue cash transactions are fully funded.
Its importance has increased as a result of the additional freedoms provided by the Prudential
Code, with specific treasury management and prudential indicators included in this Strategy that
require approval.
1.2 The treasury management and prudential indicators outlined within section 7 and 8 below
consider the affordability and impact of capital expenditure decisions, whilst the treasury
management service considers the effective funding of these decisions. Together these form part
of a process to ensure the Council meets its balanced budget requirement.
1.3 The Council’s treasury management activities are strictly regulated by statutory requirements and
a professional code of practice. In accordance with the Council’s financial regulations the Council
adopts the CIPFA “Treasury Management in the Public Services” Code of Practice (the Code)
issued in December 2021 including the Treasury Management Policy statement, and the adoption
of the key clauses outlined within Annex A. The Council also complies with the CIPFA Prudential
Code with the setting of at least three-year prudential indicators.
1.4 The Council has a Capital Strategy which is approved and reviewed annually by the Policy and
Strategy Committee, in conjunction with the Strategic Capital Investment Programme to
demonstrate that the Council takes capital expenditure and investment decisions in line with the
Councils service objectives and properly takes account of stewardship, value for money,
prudence, affordability and sustainability.
1.5 The Prudential Code requires the Council’s Capital Strategy to be aligned to the Treasury
Management Strategy. To ensure this integrated approach between the capital expenditure plans
and Treasury Management Strategy, the Council will continue to incorporate the Prudential
Indicators with regard to capital expenditure within this document. 
1.6 The Treasury Management Strategy outlines the Council’s debt position, including the anticipated
level of debt and the authorised borrowing limit. The capital expenditure plans determine the
borrowing need of the Council. The Treasury Management team essentially monitor the long-term
cash flow planning, to ensure the Council can meet its capital spending obligations.
1.7 The Code re-affirms the Audit and Scrutiny Panel’s role in providing effective scrutiny of the
Treasury Management Strategy and policies, whilst the Finance and Resources Committee
remains responsible for the development of the strategy, its implementation and monitoring.
1.8 The revised Prudential and Treasury Codes emphasises members responsibility in this area,
requiring increased member awareness, to enable greater member scrutiny of treasury
management activity. This also enables local authorities to demonstrate that members have the
necessary skills and knowledge in this complex and technical area, to make informed decisions.
The Treasury Management team provide in house awareness sessions, with members also
provided with the opportunity to review the Councils Treasury Management Practices manual. A
Treasury Management Toolkit has been developed by CIPFA Scotland Treasury Management
Forum and CIPFA, which provides an online training resource to elected members and financial
staff, to further develop knowledge and understanding of elements of treasury management.
1.9 In accordance with the CIPFA Treasury Management Code recommendations, the Council has a
Treasury Management advisory contract in place. The current providers are Arlingclose Ltd, who
provide specific advice on investment, debt and capital finance issues.
1.10 Per the CIPFA Treasury Management Code, the Council adopts a high-level approach to setting
policies for borrowing and investment activity. An appropriate scheme of delegation is in place to
ensure all staff employed in treasury management have the suitable skills and resources, to carry
out delegated treasury management activities effectively, efficiently and achieving value for
money.
1.11 The treasury management staff regularly attend training courses, seminars and workshops
provided by the Council’s advisors, the CIPFA Scotland Treasury Management Forum and other
ad hoc providers, including brokers and financial institutions. Staff also receive regular treasury 
Page 273 of 376

Page 274

Appendix 1 
Treasury Management Strategy 2025/2026, Treasury Management Indicators and  
Prudential Indicators 2025/2026 to 2028/2029 
related updates, information, and newsletters on a daily/weekly basis via email from banks and
other financial institutions. Staff also have access to treasury related websites to maintain
awareness of treasury management issues.
1.12 The requirements of the Code have been incorporated within the 2025/2026 Treasury
Management Strategy and in the preparation of the Treasury Management Indicators & Prudential
Indicators for 2025/2026 to 2029/2030.
1.13 The Code of Practice requires the Council to produce reports on its Treasury Management
policies, practices, and activities on a regular and ongoing basis. This encompasses the
preparation and approval of an Annual Strategic Plan, which defines the arrangements for
managing the Treasury Management function in the incoming year. This report details the
proposed Strategy for 2025/2026.
1.14 This Strategy covers:
 The debt and investment projections 
 Outlook in interest rates
 The borrowing and investment strategies
 Treasury Management performance indicators
 Specific limits on treasury management activities
1.15 The requirements of the Local Government Investments (Scotland) Regulations 2010 have been
incorporated within the 2025/2026 Strategy, including the preparation of an investment strategy
which must be approved by the full Council.
1.16 Members should note that the forecasts contained within this report are indicative, as per the 5-
year Strategic Capital Investment Programme 2024/25 to 2028/29 approved by the Policy and
Strategy Committee on 14 March 2024, and reviewed on a continual basis by the Strategic Capital
Delivery Group (SCDG) including re-profiling adjustments within the 5 year programme. It should
be noted therefore that the estimates presented within this report are based on the current
forecasts of the progression of the programme and projected resources available. Material
changes to the estimates/forecasts provided within this Treasury Management strategy and
Prudential indicators will be reported during the quarterly Treasury Management Monitoring
Process. 
2. Annual Borrowing Requirement 2025/2026
2.1 At the beginning of 2025/2026, it is anticipated that the Council’s total debt outstanding including
long term liabilities will amount to £1,295.5m. The Strategic Capital Investment Programme for
the period 2025/2026 to 2028/2029 will be reviewed on a continual basis by the Strategic Capital
Delivery Group (SCDG), including any re-profiling adjustments required. On this basis, it is
currently anticipated that during 2025/2026 there will be a total capital expenditure (excluding
credit arrangements) of £279.2m which comprises the General Fund Community Investment
programme of £153.4m and the Housing Revenue Account programme of £125.8m. 
2.2  The forecast capital expenditure will be resourced by capital grants, external contributions and
capital funded from current revenue (CFCR) of £109.6m, with £169.6m representing capital
investment funded by borrowing. This represents an in year borrowing need, which will contribute
towards the net increase in the Capital Financing Requirement (CFR). Table 7 within Section 8
below sets out the forecast Capital Expenditure plans for the period 2025/2026 to 2029/2030. 
2.3  During 2024/2025 the Council has primarily used a combination of internal cash balances /
reserves, short term borrowing (<1 yr) and credits due to the scheduled principal repayments to
the loans fund from service departments (annuity based) to meet its borrowing requirement and
refinancing of long-term debt maturing in lieu of long-term borrowing where possible however
long-term borrowing is undertaken when deemed appropriate. This strategy is adopted in light of
interest rate expectations, management of carrying costs, and the availability of short-term
borrowing up to 364 days at attractive rates. Whilst it will be kept under continual review, a similar
borrowing strategy is anticipated during 2025/2026 with other funding sources utilised in lieu of
future long-term borrowing, where possible, and in line with the borrowing strategy outlined below.
2.4 To meet the capital programme financing requirement, the replacement of maturing long-term
debt and the maintenance of cash balances necessary to meet on going daily liquidity 
Page 274 of 376

Page 275

Appendix 1 
Treasury Management Strategy 2025/2026, Treasury Management Indicators and  
Prudential Indicators 2025/2026 to 2028/2029 
requirements, it is estimated that the Council will require to source long-term borrowing of
£240.0m in 2025/2026, £340.0m in 2026/2027, £322.5m in 2027/2028, £253.0m in 2028/29 and
£235.0m in 2029/30.
2.5 These borrowing projections exclude temporary borrowing undertaken, with average levels held
expected to be approximately £242.0m over the forecast period. This level of short-term borrowing
can be attractive, due to generally lower rates.  It should be noted that market rates have risen
significantly as a result of a number of increases in the Bank of England Base Rate over the past
few years, due to economic and inflationary pressures, however the Bank of England has started
reducing base rate in August 2004 and it is currently anticipated that these rates are forecast to
reduce to lower levels over the forthcoming years.
2.6 The Council’s borrowing requirement is set firmly within the framework of wider Council activity
and will be driven by ‘The Plan for North Lanarkshire’, the Capital Strategy and the Medium-Term
Financial Plan. 
3. Interest Rates Outlook and Other Economic Updates
3.1 The impact on the UK from the government’s Autumn Budget, slower interest rate cuts, modestly
weaker economic growth over the medium term, together with the impact from President Trump’s
second term in office and uncertainties around US domestic and foreign policy, will be major
influences on the Authority’s treasury management strategy for 2025/26.
3.2 The Bank of England’s (BoE) Monetary Policy Committee (MPC) reduced Bank Rate to 4.75% at
its meeting in November 2024, having previously cut by 25bp from the 5.25% peak at the August
MPC meeting.
3.3 The Bank of England’s quarterly Monetary Policy Report (MPR) in November forecasted Gross
Domestic Product (GDP) growth to pick up to around 1.75% (four-quarter GDP) in the early period
of the BoE’s forecast horizon before falling back. The impact from the Budget pushes GDP higher
in 2025 than was expected in the previous MPR, before becoming weaker. Current GDP
registered no growth (0.0%) between July and September 2024, and 0.4% growth between April
and June 2024, a further downward revision from the 0.5% rate previously reported by the Office
for National Statistics. 
3.4 The outlook for CPI inflation in the November MPR showed it rising above the MPC’s 2% target
from 2024 into 2025 and reaching around 2.75% by the middle of calendar 2025. This represents
a modest near-term increase due to the ongoing impacts from higher interest rates, the Autumn
Budget, and a projected margin of economic slack. Over the medium-term, once these pressures
ease, inflation is expected to stabilise around the 2% target.
3.5 The labour market appears to be easing slowly however, but the data still requires treating with
some caution. The latest figures reported the unemployment rate rose to 4.4% in the three months
to November 2024, while economic inactivity also declined. Pay growth for the same period was
reported at 5.6% for both regular earnings (excluding bonuses) and for total earnings. Looking
ahead, the BoE’s MPR showed the unemployment rate is expected to increase modestly, rising
to around 4.5%, the assumed medium-term equilibrium unemployment rate, by the end of the
forecast horizon.
3.6 In global terms the US Federal Reserve has also been cutting interest rates, bringing down the
Fed Funds Rate by 0.25% at its December 2024 monetary policy meeting to a range of 4.25%-
4.50%, marking its third consecutive reduction. Further interest rate cuts are expected in 2025,
but uncertainties around the potential inflationary impact of President Trump’s policies may muddy
the waters in terms of the pace and magnitude of further rate reductions. Moreover, the US
economy continues to expand at a decent pace, rising at an annual rate of 2.8% in the third
quarter of 2024, and inflation remains elevated suggesting that monetary policy may need to
remain more restrictive in the coming months than had previously been anticipated.  The
European Central Bank (ECB) also continued its rate cutting cycle, reducing its three key policy
rates by 0.25% in December. Euro zone inflation rose above the ECB 2% target in November
2024, hitting 2.2% as was widely expected and a further increase from 2% in the previous month.
Inflation is expected to rise further in the short term, but then fall back towards the 2% target
during 2025, with the ECB remaining committed to maintaining rates at levels consistent with
bringing inflation to target, but without suggesting a specific path.
Page 275 of 376

Page 276

Appendix 1 
Treasury Management Strategy 2025/2026, Treasury Management Indicators and  
Prudential Indicators 2025/2026 to 2028/2029 
3.7 Arlingclose forecasts that The Bank of England’s Monetary Policy Committee will continue
reducing rates through 2025, taking Bank Rate to around 3.75% by the end of the 2025/26
financial year. The effect from the Autumn Budget on economic growth and inflation has reduced
previous expectations in terms of the pace of rate cuts as well as pushing up the rate at the end
of the loosening cycle.
3.8 Arlingclose expects long-term gilt yields to remain broadly at current levels on average (amid
continued volatility), but to end the forecast period modestly lower compared to now. Yields will
continue remain relatively higher than in the past, due to quantitative tightening and significant
bond supply. As ever, there will be short-term volatility due to economic and (geo)political
uncertainty and events.
3.9 Movements in supply and demand for UK gilts heavily influence the gilt prices and yields, with
corresponding movements up or down in the PWLB interest rates reflecting the perception of
improved stability or increased uncertainty in both the UK and other non-UK financial markets
respectively.
3.10 Annex D provides details of the forecast official Bank rate, 3-month money market rate and PWLB
rates over the next five years which are underpinned by the economic risks and uncertainties
outlined in the preceding paragraphs above. 
3.11 The Council’s main source of borrowing is the HM Treasury’s PWLB lending facility (PWLB), with
PWLB lending generally available at 100bps (1.00%) above UK gilt prices with any forecast
movements in PWLB interest rates closely correlated to gilt movements. 
3.12 Table 1 below includes forecast average PWLB rates anticipated for a range of maturity periods
over the next 5 years based on the forecast per Annex D. The interest rates shown take account
of the 0.20% reduction in the standard rates which will apply if the Council, as expected, meets
the qualifying criteria for the certainty rate in 2025/2026 and future years. Please note as per para
4.21 that there is an additional discount available on PWLB rates of 0.4% for qualifying HRA
borrowing that relates to the period to March 2026 only. 
3.13 These projections underpin the borrowing and investment strategies outlined in the following
paragraphs.
4.0 Annual Borrowing Strategy 2025/2026 
4.1 The Council uses a combination of internally accumulated cash funds i.e. its revenue
reserves/balances plus working capital, temporary borrowing (up to 364 days) and external
borrowing from both the markets and PWLB, to fund its capital financing requirement (CFR). This
minimises the amount of investment balances held, managing credit and counterparty risk and
the impact of low investment returns, resulting in the Council currently being in an under borrowed
position, which is in line with the strategic approach adopted.
4.2 The borrowing strategy to meet the current year (2024/2025) capital programme financing
requirement of £132.4m (excluding credit arrangements), has been to use a combination of
internal cash balances, and short-term borrowing where available at attractive rates plus credits
due to the scheduled principal repayments, in lieu of future long-term borrowing where possible,
however long-term borrowing has been taken when deemed appropriate. This strategy is
supported by efficient cashflow management, interest rate outlook, forecast balance sheet 
Annual
Average
Bank
Rate
3 months
Money
Market Rate
5 Year 10 Year 20 Year 50 Year
2025 4.06% 4.24% 4.95% 5.18% 5.65% 5.35%
2026 3.75% 3.85% 4.74% 5.01% 5.45% 5.15%
2027 3.75% 3.85% 4.85% 5.05% 5.45% 5.15%
2028 3.75% 3.85% 4.85% 5.05% 5.45% 5.15%
2029 3.75% 3.85% 4.85% 5.05% 5.45% 5.15%
Table 1 - Medium Term Interest Rate Estimates (averages)
PWLB Rates
Page 276 of 376

Page 277

Appendix 1 
Treasury Management Strategy 2025/2026, Treasury Management Indicators and  
Prudential Indicators 2025/2026 to 2028/2029 
analysis of reserves and provisions, and effective treasury risk management. It is proposed that
a similar borrowing strategy be adopted where possible to meet the financing requirement of
£169.6m in 2025/2026.
4.3 The successor to IAS17 Leases, IFRS16 Leases was applicable for Local Authorities from 1 April
2022. An optional two-year delay was announced, and each authority had the choice of when to
implement this new standard, but by no later than 1st April 2024.  Implementation will, dependent
upon the nature of the financing and business model, require costs previously presented as
revenue costs, restated and shown as capital expenditure under a credit arrangement. This is
being implemented in the current 2024/2025 financial year, it is expected this will primarily impact
upon the current accounting treatment for vehicles, plant and equipment (VPE), acquired under
operating lease arrangements, as well as impacting on PPP contract liabilities, with an estimated
increase in the Council’s 2024/2025 Capital Financing Requirement of approximately £98.7m
(PPP £96.5m, VPE £2.2m). This is reflected in Table 7 within Section 8.0 below.
4.4 For 2025/2026, it is anticipated that the Capital Financing Requirement will increase by £143.8m,
which comprises the capital investment funded by borrowing and movement in balances held
under credit arrangements due to ongoing impact of IFRS16 Leases, offset by scheduled principal
repayments of loan fund advances and finance leases.
4.5 It is estimated that the Council will require to source long-term borrowing of £240.0m in
2025/2026, £340.0m in 2026/2027, £322.5m in 2027/2028, £253.0m in 2028/29 and £235.0m in
2029/30 to meet the on-going capital financing requirements, the replacement of maturing long-
term debt and the maintenance of cash balances necessary to meet on going daily liquidity
requirements. 
4.6 These borrowing projections exclude monies borrowed and repayable over a shorter period, with
average levels held expected to be approximately £242.0m over the five-year period. This level
of short-term borrowing is generally attractive due to lower rates typically available.
4.7 The Council’s capital expenditure planning processes and investment/borrowing analysis enables
it to time its borrowing to take advantage of opportunities that may arise to achieve beneficial
borrowing rates, minimising interest rate risk.
4.8 The timing of new borrowing will also take into account the level of cash balances and investments
held so that there may be an option of postponing borrowing and continuing to use these balances
in the short term.
4.9 The Councils borrowing strategy will be underpinned not only by the absolute borrowing rates but
also the relationship between short and long-term interest rates. This difference creating a ‘cost
of carry’ for any new longer-term borrowing where the proceeds of borrowing are temporarily held
as investments because of the difference between what is paid on the borrowing and what is
earned on the investment. 
4.10 The Council will closely monitor movements in long and short-term interest rates to manage its
interest rate risk.
4.11 The repayment terms of new borrowing will take account of the debt maturity profile to ensure
that an acceptable amount matures in any one year, managing the refinancing risk, whilst being
undertaken at the most advantageous rate.
4.12 The forecast debt maturity profile at the 31 March 2025 per the graph below highlights that there
are a number of points in the maturity spectrum at which the Council has little or no debt due for
repayment. In general, the current maturity profile provides the Council with flexibility in
determining the maturity period for new borrowing, whilst ensuring the strategy adopted minimizes
the debt interest costs.
4.13 It should be noted that the debt maturity profile per the graph is based on the maturity date of
LOBO (Lender’s Option Borrower’s Option) loans, whilst noting the Code requires the Council to
classify LOBO type loans as having a potential maturity in the year where options or calls exist.
A LOBO option is called, when the lender exercises its right to amend the interest rate, at which
point the Council can accept the revised terms or reject them and repay the loan. 
Page 277 of 376

Page 278

Appendix 1 
Treasury Management Strategy 2025/2026, Treasury Management Indicators and  
Prudential Indicators 2025/2026 to 2028/2029 
4.14 The Council currently has a £3.0m exposure to LOBO loans which can be called within
2025/2026, which represents less than 0.48% of the projected long-term debt held at the 31 March
2025 of £626.130m. The interest rates on the LOBO loans held range from 10.625% to 10.937%,
averaging 10.781%. 
4.15 A comparison of the LOBO loan option 2025/2026 call dates to the maturity date is provided within
Table 2 below: 
4.16 Based on the current and the forecast interest rates, the likelihood of these loans being called
has been assessed as minimal. In the event that the call option is exercised, the default position
will be the repayment of the LOBO without penalty, with the associated treasury management
risks (refinancing/interest rate/liquidity) managed in line with the borrowing strategy for other
maturing debt.
4.17 The Council’s Treasury Management advisors provide forecasts of interest rates for different
maturity dates in future years. Using these forecasts, it is projected over the years 2025/2026 to
2029/2030, the PWLB borrowing rates may average between 4.74% and 4.95% (up to 5 years)
and between 5.15% and 5.35% (up to 50 years).
4.18 Uncertainty over future interest rate movements increases the risks associated with treasury
management borrowing activity, therefore it should be noted, that the period over which any new
borrowing is taken will be guided by movements and fluctuations in the interest rate yield curve
and capital financing requirement. 
4.19 No more than 25% of the total debt outstanding shall be taken from any one lender at any one
time, except for borrowing from Public Works Loan Board (or its successor body), unless
expressly approved by the Chief Officer (Finance) in line with current policy. 
10
20
30
40
50
60
70
80
90
M
ILLIONS
FINANCIAL YEAR
Forecast Long Term Debt Maturity Profile 31 March 2025
PWLB MARKET LOANS
Loan Value 2025/2026 Call Dates
Year of
Maturity
Current
Interest Rate
£2,000,000 1st June & 1 December 2025/2026 10.6250%
£1,000,000 3 April & 3 October 2026/2027 10.9375%
Table 2 - LOBO Loans Summary
Page 278 of 376

Page 279

Appendix 1 
Treasury Management Strategy 2025/2026, Treasury Management Indicators and  
Prudential Indicators 2025/2026 to 2028/2029 
4.20 The Council must apply annually to be eligible for a certainty rate discount of 20 basis points (bps)
on the standard borrowing rate. The Council was successful in its application to the PWLB in April
2024, meeting the criteria and obtaining eligibility for the certainty rate discount on PWLB loans,
accessible from 1 April 2024. Note within Table 1 above the medium-term interest rate average
forecasts for the PWLB interest rates include the 20bps discount. 
4.21 A new PWLB HRA rate, which is 40bps below the certainty rate, has been available from 15th
June 2023. This rate has recently been extended until March 2026, and is to support local
authorities to borrow for Housing capital purposes or refinancing existing loans. In conjunction
with our treasury advisors, we continue to review the requirements and assess the borrowing
opportunities for the Council.
4.22 The Council will consider a number of borrowing structures in 2025/2026 which will include;  
• Internally accumulated cash funds.
The Council may temporarily use its cash backed revenue reserves/balances plus working
capital to support its capital programme generally known as internal borrowing, in lieu of future
short and long-term borrowing. This approach may be adopted to manage the level of
investment balances held, managing credit and counterparty risk and the impact of low
investment returns and cost of carry.
• Short-term Borrowing 
The Council may borrow on a temporary basis (up to 364 days) which would significantly
reduce the carrying costs whilst managing the refinancing and interest rate risk. For example,
for loans up to 364 days, other local authorities generally offer better terms than those of the
PWLB for a 1-year loan, with this option therefore being more attractive. This may also be used
to meet cashflow demands to manage temporary fluctuations in cash balances held on a daily
basis. Short-term interest rates are currently higher than in the recent past but are expected to
fall in the coming year and it is therefore likely to be more cost effective over the medium-term
to either use internal resources, or to borrow short-term loans instead where possible.
• PWLB Variable Rate Loans
These loans are available for periods of up to 10 years with the interest payable generally
linked to movements in short term rates. Liquidity within the short-term borrowing market may
supercede the potential benefits of this type of borrowing. 
• PWLB Fixed Rate Maturity Loans (< 20 years)
New loans for periods up to 20 years, which fit in with the existing debt maturity profile, are
attractive, providing relatively low refinancing risk as as short-term rates are expected to
remain lower than their longer dated counterparts for the foreseeable future. These could offer
greater flexibility to repay/reschedule on beneficial terms in the future, depending on the
volatility of interest rates.
• PWLB Equal Instalment Payment and Annuity Loans (< 30years) 
These loans are different from fixed rate maturity loans as the repayments are made up of both
interest and principal with the principal outstanding reducing at 6 monthly intervals throughout
the life of the loan, with corresponding reduction in interest payments on the balance
outstanding. The interest rates payable are lower than the fixed rate maturity loans for short
and medium dated maturities with an additional benefit being a smoother debt maturity profile
on the debt e.g. £2.5m every year for 10 years as opposed to £25m payable in 10 years. This
also spreads the refinancing risk and may also present beneficial opportunities dependent
upon the interest yield curve at the time repayments are due. 
• Medium/Long Term Fixed PWLB Loans (> 20 years)
These loans will be considered in conjunction with managing the current debt maturity profile,
the higher interest rate profile and the additional cost of carry. These loans currently offer less
flexibility in terms of debt restructuring as a result of PWLB Circular 147, which left the
premature repayment rates unaltered. As a result, these are currently the least attractive
option,  but circumstances will be monitored to identify beneficial opportunities to source PWLB
loans within this maturity spectrum.  
Page 279 of 376

Page 280

Appendix 1 
Treasury Management Strategy 2025/2026, Treasury Management Indicators and  
Prudential Indicators 2025/2026 to 2028/2029 
• Market Loans
At present availability is limited, but in the future these loans may become more attractive given
the 0.80% margin on PWLB loan rates, as these loans could be cheaper than similar long term
PWLB loans despite this being partially offset by the certainty rate. In addition to the possibility
of advantageous interest rates, there is also the ability to fix the rate for receipt at a date in the
future, avoiding the cost of carry for example to cover future maturities in the period 2025/2026
to 2029/2030. 
• Local Authority Bonds
Local authority bonds can be issued by a public stock exchange listing, a private placement or
a retail bond but would only become a viable option if the size of funds to be borrowed reached
a minimum of £150m. Prior to undertaking a bond issuance, the Council would carry out a due
financial diligence process. Factors to be considered would be the type of bond issue e.g.
index linked, the set-up costs, the timing of the issue, the potential cost of carry, the credit
rating process, the projected long term capital financing requirement position and the nature
of the projects being funded e.g. income streams index linked.
• Leasing 
On occasions, leasing will be used if an option appraisal review identifies this as being
advantageous to the Council and considering IFRS16 Leases impacts.
4.23 As part of its borrowing strategy, the Council will seek to identify and evaluate opportunities for  
debt rescheduling to accrue potential benefits including:
• achievement of cash interest savings, without exposing the Council to additional risk;
• ensuring a more balanced maturity profile and volatility ratio; and 
• achieving the desired borrowing strategy.
4.24 The Council will continue to monitor its debt portfolio and movements in interest rates across
PWLB interest rate structures, to identify opportunities to generate interest savings, whilst
strategically managing any premiums or discounts incurred as a result of the rescheduling/
restructuring.
4.25 The Local Authority (Capital Finance and Accounting) (Scotland) Regulations 2016 legislation
enacted on 1 April 2016 and associated Local Government Circular 7/16 Statutory Guidance on
Loans Fund Accounting provide the legislative background governing the Council's borrowing
activity.
5.0 Annual Investment Strategy 2025/2026
5.1 Investment Regulations
5.1.1 The Investment Regulations became statutory instruments by force of the Scottish Parliament on
the 1 April 2010 in conjunction with the associated Code on the Investment of Money by Local
Authorities. This requires the Council to approve all the types of investments to be used and set
appropriate time and money limits for the amount that can be held in each investment type.  These
types of investments are termed permitted investments and any investments used which have
not been approved as a permitted investment will be considered as ultra vires.
5.1.2 Following a Markets in Financial Instruments (MiFID III) directive, from the 3 January 2018, local
authorities were to be treated as retail clients, with the option to opt up to professional status
provided certain criteria was met. The Council continues to meet the conditions to opt up to
professional status and therefore continues to have access to products including money market
funds, pooled funds, treasury bills, bonds shares and to financial advice.
5.2 Risk Management
5.2.1 In accordance with the revised code, the Council recognises the importance of risk management,
and the effective management of all the associated treasury management risks encountered in
working with the approved permitted list of investments. The treasury management risks and tools
put in place to manage these risks include:
• Credit and counterparty risk: this is the risk of failure by a counterparty to meet its contractual
obligations to the Council, particularly as a result of the counterparty’s diminished 
Page 280 of 376

Page 281

Appendix 1 
Treasury Management Strategy 2025/2026, Treasury Management Indicators and  
Prudential Indicators 2025/2026 to 2028/2029 
creditworthiness and the resulting detrimental effect on the Council’s capital or revenue
resources. There are no counterparties where the risk is zero although AAA rated organisations
have a very high level of creditworthiness. The Council has in place minimum credit criteria to
determine which counterparties and countries are of high creditworthiness to enable
investments to be made safely.
• Liquidity risk: this is the risk that cash will not be available when it is needed. While it could be
said that all counterparties are subject to at least a very small level of liquidity risk, the Council
measures this risk on whether or not, instant access to cash can be obtained from each form of
investment. The Council has developed a detailed cashflow model to record known and forecast
income and payment events arising in the short, medium to long term.
• Interest Rate Risk: This is the risk that fluctuations in the levels of interest rates create an
unexpected or unbudgeted burden on the Council’s finances against which the Council has
failed to protect itself adequately. To manage this risk, the Council takes a view of the future
course of interest rates and formulates a Treasury Management Strategy accordingly, aiming to
maximise investment earnings and minimise borrowing costs, whilst giving full regard to other
treasury management risk factors including security and liquidity.
• Price Risk Management: This risk primarily relates to financial instruments that are regularly
traded in the various financial market exchanges. This is the risk that the Council is required to
redeem this type of investment prematurely at prices above and below the price on which the
financial instrument was originally purchased (par value) and thus be subjected to the market
conditions prevailing at that time. If the investment is held to maturity the principal sum is
guaranteed with it being redeemed at par value. The Council will only use those which appear
on its permitted investment list, if their redemption price is not expected to vary much during its
short life or for example in the case of treasury bills they offer a higher rate of return than
depositing in the Debt Management Account Deposit Facility for a similar level of security.
• Legal and Regulatory Risk: This is the risk that the Council itself or an organisation with which
it is dealing in its treasury management activities fails to act in accordance with its legal powers
or regulatory requirements and the Council suffers losses accordingly. In the event of any doubt
as to the legal and regulatory issues the Council has recourse to its own in-house legal services
team and also the Council’s appointed treasury advisors Arlingclose Ltd. The Council also
currently has in place a highly experienced and qualified Treasury Management team. 
5.3 Permitted Investments
5.3.1 The permitted investments which may be used in the forthcoming year are:
a. Deposits with the Debt Management Account Facility (UK Government);
b. Deposits with other local authorities or public bodies;
c. Instant Access Accounts;
d. Call Accounts;
e. Term Deposits;
f.  Money Market Funds;
g  Instant Access Funds held with Council’s own bank;
h. UK Government Gilts and Treasury Bills;
i.   Supranational Bonds (e.g. World Bank);
j.   Certificates of deposits with financial institutions (banks and building societies);
k. Covered Bonds;
l.  Reverse repurchase agreements and other collateralised arrangements;
m. Investment properties;
n. Loans to third parties, including soft loans;
o. Loans to a local authority company;
p. Shareholdings in a local authority company;
q. Non-local authority shareholdings;
r.  Subordinated debt in projects delivered via ‘Hubco / DBFM’ model   Page 281 of 376

Page 282

Appendix 1 
Treasury Management Strategy 2025/2026, Treasury Management Indicators and  
Prudential Indicators 2025/2026 to 2028/2029 
5.3.2 In respect of Money Market funds (MMF) listed per f) above, these funds invest in high-quality
short-term fixed income instruments and adhere to very strict credit quality, diversification and
maturity guidelines with preservation of capital constituting the primary objective. Prior to January
2019, the Council used Constant Net Asset Value (CNAV) Funds meaning for every £1 of principal
invested the fund will return £1 of principal on withdrawal by the investor, plus interest with
preservation of capital the prime objective.
5.3.3 However on the 21 January 2019, as a result of MMF Industry reform, the CNAV funds are no
longer available and on this date two types of funds became available to the Council:   
•  a Public Debt CNAV (assets invested in government debt); and
•  a ‘Low Volatility NAV’ (LVNAV) that is a hybrid between CNAV and VNAV 
5.3.4 After scrutiny of the new products available, the Council continues to use money market funds,
primarily using the LVNAV type as an investment instrument. It is worth noting that one of the
main differences between the LVNAV and CNAV fund is the Council is no longer guaranteed
preservation of capital i.e. for every £1 of principal invested the fund will no longer guarantee a
return £1 of principal on withdrawal.
5.3.5 However, the day-to-day operation of LVNAV funds is very similar and has many of the attractive
features of the CNAV fund and the probability of the price changing and loss of capital, within the
boundaries set for price changes i.e. “the collar”, is widely regarded as de minimis. Therefore, the
use of these investments continue to remain within the risk appetite adopted by the Council per
its investment approach. 
5.3.6 Bail-in legislation which ensures that large investors including local authorities will rescue failing
banks instead of taxpayers in the future, is now fully implemented in the UK. Under the UK
Financial Services Compensation Scheme and similar European Schemes most private sector
investors are now partially or fully exempt from contributing to a bail-in. The credit risk associated
with making unsecured bank deposits has therefore increased relative to the risk of other
investment options.  
5.3.7 To manage the bail-in risk, covered bonds, reverse repurchase arrangements and other collateral
arrangements with financial institutions are included within the permitted investment list. These
investments are secured on the assets of the borrower, which limits the potential losses in the
unlikely event of insolvency and would be exempt from bail-in.
5.3.8 Whilst there is no investment specific credit rating for these types of arrangements, the collateral
upon which the investment is secured has a credit rating, with the highest of the collateral credit
rating and the counterparty credit rating being used to determine cash and time limits. Note the
combined secure and unsecured investments in any one bank should not exceed the cash limit
for that counterparty.
5.3.9 Investments in subordinated debt in projects delivered via the ‘Hubco/DBFM’ model included
within the permitted investments list will only be undertaken, following a full risk/benefit analysis,
subject to a maximum investment amount of £1.5m per project and for a maximum term of 30
years. 
5.3.10 For cash investments, there is a risk of capital loss arising from selling ahead of maturity if
combined with an adverse movement in interest rates and for term deposits and loans if they are
redeemed early. Therefore, the Council will undertake these investments in conjunction with its
cashflow/liquidity projections and medium-term financial plans to manage this risk. 
5.3.11 Within the Treasury Management code, it suggests the use of financial derivatives but given that
the legal power to use derivative instruments remains unclear, the Council does not intend to use
derivatives. Should the legal position change, the Council may seek to develop a detailed and
robust risk management framework, governing the use of derivatives, but prior to adoption, full
Council approval will be sought. 
5.4 Investment Security
5.4.1 Although the yield on investment is a key consideration, the primary principle governing the
Council’s investment criteria is the security of its investments. 
Page 282 of 376

Page 283

Appendix 1 
Treasury Management Strategy 2025/2026, Treasury Management Indicators and  
Prudential Indicators 2025/2026 to 2028/2029 
5.4.2 After this main principle the Council will ensure:
• It has sufficient liquidity in its investments, carefully selecting the maximum periods for
which funds may prudently be committed also applying the Council’s prudential and treasury
management indicators covering the maximum principal sums invested.
• It maintains a policy covering the categories of investment types it will invest in, the criteria
for choosing investment counterparties with adequate security, and to continually monitor
security. 
5.4.3 The Council minimises risk by identifying those financial institutions that it may invest in to
maximise security and liquidity of investment including the specification of maximum time and
money limits for each type of permitted investment offered by financial institutions. The
counterparty must meet the relevant credit rating requirement with the focus being on the
minimum acceptable quality adding a further security overlay to the investment activity of the
Council.
5.4.4 The Council utilises the research of the world’s foremost providers of independent credit ratings.
The ratings defining the likelihood of an investor such as the Council receiving their money back
on the terms in which it was invested. (Long term Rating types and definitions are shown in Annex
B).
5.4.5 The Council defines ‘high credit quality’ organisations and securities as those having a credit
rating of A- or higher that are domiciled in the UK or a foreign country with a sovereign rating of
AA+ or higher. For money market and other pooled funds, the Council defines a high credit rating
as those having a credit of A- or higher. Investments with organisations with long term ratings in
the BBB long term category will therefore be restricted by cash and maturity limits. 
5.4.6 The Council also supplements its credit rating information by accessing and applying additional
operational market information before making any specific investment decision from the agreed
pool of counterparties.
5.4.7 This additional market information will be applied to compare the relative security of differing
investment counterparties and will include:
• Credit Default swap prices;
• Quality financial press;
• Share prices;
• Government support status / Bank Resolution and Recovery Directive;
• Annual Reports;
• Statements to the market; and
• Financial Regulations;
5.4.8 Should this additional market information raise concerns regarding the security of a financial
institution, then subject to further investigation this may also result in removal from the list.
5.4.9 The creditworthiness of counterparties will be monitored regularly. The Council receives credit
rating information from Arlingclose Ltd (the Council’s advisors) as and when ratings change, and
counterparties are checked promptly. If a rating change results in the counterparty failing to meet
the Council’s strict criteria, they are removed immediately from the list. Similarly, if a counterparty
rating is updated and they meet the Council’s strict criteria, they will be added to the list.
5.4.10 Full details of the Council’s investment approach including the type of investments, treasury
management risks, associated controls, credit rating, money and time limits are shown in Annex
C. The credit rating criteria indicated within the Annex stipulates a long-term rating requirement
as this is considered the ultimate driver of credit worthiness of financial institutions. This
represents a rating agency view of an institutions capacity to honour its financial obligations and
its vulnerability to foreseeable events. The Council in conjunction with its advisors will continue to
monitor other information provided from credit rating agencies in terms of short term, individual
rating, support rating and outlook.
5.4.11 The Council will give due care when considering the country, group and sector exposure of the
Council’s investments and will endeavour to have no more than 25% placed with any non-UK
country at any time. A group of banks under the same ownership will be treated as a single 
Page 283 of 376

Page 284

Appendix 1 
Treasury Management Strategy 2025/2026, Treasury Management Indicators and  
Prudential Indicators 2025/2026 to 2028/2029 
organisation for limit purposes with industry /sector activity monitored regularly for
appropriateness.
5.4.12 Environmental, social and governance (ESG) considerations are increasingly a factor in global
investors’ decision making, but the framework for evaluating investment opportunities is still
developing and therefore the Authority’s ESG policy does not currently include ESG scoring or
other real-time ESG criteria at an individual investment level. When investing in banks and funds,
the Authority will prioritise banks that are signatories to the UN Principles for Responsible Banking
and funds operated by managers that are signatories to the UN Principles for Responsible
Investment, the Net Zero Asset Managers Alliance and/or the UK Stewardship Code.
5.5 Investment Strategy 
5.5.1 The Council, by efficient cashflow management and balance sheet analysis, will identify its
liquidity requirements and the core funds within its cash balances that could be locked in over a
longer period up to the maximum limits as defined within Annex C. This will achieve the optimum
performance, spreading investment periods and security of return, subject to over-riding credit
counterparty security.
5.5.2 The 2025/2026 Treasury Management Strategy has been developed assuming that the annual
borrowing requirement and debt repayments, net of credits due to the scheduled principal
repayments to the loans fund, will be fully funded by undertaking external borrowing. Therefore,
it is anticipated that the Council cash balances available for short term investment will average
approximately £40.0m throughout the period 2025/2026 to 2029/2030. 
5.5.3 This projected balance being subject to variation dependent upon actual level and timing of
external borrowing undertaken, which will reflect positive and negative movements in working
capital and level of revenue reserves/balances held during the 5-year period. 
5.5.4 All investment activity will be governed by the principles laid out within sections 5.1 to 5.5 above
and 5.7 below.
5.6 Borrowing and the Investment of Money 
5.6.1 The Council will not borrow more than or earlier than required with the prime intention to profit
from the investment return of the extra sums borrowed. 
5.6.2 Borrowing in advance will only be taken for risk management reasons subject to sound
justification. When considering borrowing in advance the Council will balance investment risks,
such as the credit and interest risks resulting from the temporary investment of the proceeds of
borrowing, against the risk of adverse interest rate movements if borrowing is deferred.
Consideration will also be given to the existing debt maturity profile over the medium term.
5.6.3 The Council will appraise all risk associated with advance borrowing activity with subsequent
reporting either within the mid-year or annual reporting mechanism. This report will comply with
the minimum data and analytical requirements outlined within The Local Government Investments
(Scotland) Regulations 2010.
5.7 Non-Treasury Management Investment Activity
5.7.1 The CIPFA Treasury Management Code includes a section on Non-Treasury Management
investment activity, which would normally be for those investments made for policy reasons
outside of normal Treasury Management Activity, and may include: 
• service investments held clearly and explicitly in the course of the provision and for
purposes of operational services  
• commercial investments which are taken mainly for financial reasons and to achieve a
financial return
5.7.2 Normal treasury management activity would cover those investments which arise from the
organisation's cashflows and debt management activity and ultimately represent balances which
need to be invested until cash is required for use in the course of the Council's normal business.  Page 284 of 376

Page 285

Appendix 1 
Treasury Management Strategy 2025/2026, Treasury Management Indicators and  
Prudential Indicators 2025/2026 to 2028/2029 
5.7.3 For investments that fall outwith normal treasury management activity the Council will ensure that
proper due diligence is carried out to ensure that there is a proper understanding as to:
• the powers under which the investment is made to ensure the activity is legal
• the service rationale behind the decision to undertake this type of investment 
• the extent to which capital invested is placed at risk 
• impact of any potential losses on the financial sustainability of the Council 
• the specialist professional advice required to assist in the decision-making process
5.7.4 The Council will carry out more careful risk assessment, as it recognises there may be instances
where such investments do not give priority for security and liquidity over yield whether due the
nature of the transaction itself e.g. commercial investments or for valid service reasons.
5.7.5 Effective scrutiny will be carried out and the justification behind the decision should be explicit,
clearly outlining that it is within the Councils legal powers, the level of risk to both capital and
returns, the requirement to seek specialist advice if sought and the potential impact on future
sustainability if risks come to pass. 
5.7.6 This would also include any external underwriting of those risks e.g. guarantees. Given the
increase in Councils creating ALEO’s and increasing partnership working, the Council may be
asked to provide a financial guarantee to enable other parties to access funds which may not
otherwise be available due to their size / lack of credit history. This may also result in external
funds being accessed at more favourable terms than they are likely to receive, which will accrue
both an operational and financial benefit to the Council. 
5.7.7 In general, a financial guarantee is a promise to take responsibility for another company's financial
obligation if that company cannot meet its obligation. Prior to agreeing to the provision of a
financial guarantee, due financial diligence of the terms of the financial guarantee must be carried
out, including an assessment as to the likelihood of the guarantee being called and potential
financial liability to the Council. 
5.7.8 The responsibility for proper scrutiny and final approval is the Council’s Chief Officer (Finance).
Information in respect of non-Treasury Management investments must be clearly laid out and
available within the Council’s statutory accounts.
5.7.9 Following the PWLB consultation in the first half of 2020, the PWLB announced revised terms of
engagement for borrowing in particular around non-Treasury Management activity. Of greater
relevance in England and Wales, given recent activity, Councils are required to confirm there is
no intention to borrow for the purposes of acquiring investment assets primarily for yield e.g. retail
outlets, hotels in the current or next two financial years otherwise the facility may be suspended
or withdrawn fully.  The revised Prudential Code also makes it a requirement that local authorities
must not borrow to invest primarily for financial return.
6.0 Performance Measurement Indicators & Benchmarking 
6.1 The Code of Practice on Treasury Management requires the Council to use performance
indicators to assess the adequacy of the treasury management function over the year and
incorporate benchmarking to assess performance which is reported within the Annual Treasury
Management Activity report. These are distinct historic indicators, which are additional to the
predominantly forward-looking prudential indicators outlined in later sections of this report.
6.2 In respect of liquidity which is defined as the Council “having adequate, though not excessive
cash resources, borrowing arrangements, overdrafts or standby facilities to enable it at all times
to have the level of funds available to it which are necessary for the achievement of its
business/service objectives” (CIPFA Treasury Management Code of Practice) the Council will
seek to maintain: Liquid short term deposits of at least £3m available on an overnight basis.  
Page 285 of 376

Page 286

Appendix 1 
Treasury Management Strategy 2025/2026, Treasury Management Indicators and  
Prudential Indicators 2025/2026 to 2028/2029 
6.3 This Council generally uses the following historic indicators to monitor its loan portfolio
performance and benchmarking: 
❖ Borrowing: Average rate of borrowing for the year compared to average in previous year.
❖ Investments: Local measures of yield benchmarks are the Council’s average return on short
term investment activity in comparison to: 
- 3-month money market rate 
- Council’s own bank: Instant Access Account; 
- Council’s Advisors benchmarking club
6.4 In the context of benchmarking security, this is a much more subjective area to assess. The
Council currently evidences this by the application of minimum quality criteria to investment
counterparties, through the use of credit ratings, supplied by the three main credit rating agencies,
together with additional market information available as described earlier within this report and
outlined within Annex C. 
7.0 Treasury Management Local and Mandatory Indicators 2025/2026 to 2029/2030
7.1 Treasury Management Local Indicator: Interest Rate Exposure  
7.1.1 Per the revised CIPFA TM code, the Council is no longer required to set a mandatory indicator
for limits with regard to fixed and variable interest rate exposure. The Council will monitor its
interest rate exposure by the local indicator shown in Table 3 below. The proportion of fixed
interest rate costs to variable interest costs will be monitored on a quarterly basis to identify if
there are any potential risks if interest rates were to move significantly upwards.  The Council will
also monitor debt maturity profile, the spend profile of the capital programme and also continue
to adopt a prudent approach to use of internal balances in lieu of future long-term borrowing i.e.
monitor under borrowing position.  The economic outlook and interest rate forecast will
supplement this on-going review of interest rate exposure. 
7.1.2 Table 3 above relates only to external interest payments, excluding interest on revenue balances,
and includes a number of assumptions regarding the timing and nature of the new borrowing
anticipated. As mentioned previously the capital planning process and investment/borrowing
analysis enables the Council to take advantage of opportunities that may arise, to achieve
beneficial borrowing rates over the same period.
7.1.3 Table 3 highlights that the Council anticipates net loan external interest payments of
approximately £48.6 million for 2025/2026. Of this total, £50.1 million relates to interest payable
on fixed rate debt, for which interest payments are guaranteed until the loans mature, £0.3million
for interest payable on variable rate debt, and (£1.5) million relates to interest receivable on funds
invested. Variable rate loans and funds deposited are subject to changes in interest rates and will
be monitored as part of the Council’s Treasury Management Strategy on an ongoing basis.  
Content of loan portfolio
£m % £m % £m % £m % £m %
External Interest Council is due to pay:
Fixed rate loan debt 49.9 99.5% 63.4 100.0% 80.1 100.0% 94.8 100.0% 107.3 100.0%
Variable rate loan debt 0.3 0.5% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0%
50.1 100.0% 63.4 100.0% 80.1 100.0% 94.8 100.0% 107.3 100.0%
External Interest Council is due to receive:
Investments - variable terms 1.5 100.0% 1.4 100.0% 1.4 100.0% 1.4 100.0% 1.4 100.0%
Net Loan Interest Payments 48.6 62.0 78.7 93.4 105.8
Table 3 - Loan Indicators Interest Rate Exposures 2025/26 to 2029/30
2029/302025/26 2026/27 2027/28 2028/29
Page 286 of 376

Page 287

Appendix 1 
Treasury Management Strategy 2025/2026, Treasury Management Indicators and  
Prudential Indicators 2025/2026 to 2028/2029 
7.1.4 The table below highlights the estimated impact of a one basis point increase or decrease (e.g.
4.0% variable rate rising to 5.0% or falling to 3.0%) in interest rates to treasury management
costs/income for next year. Fixed interest rate debt will not be affected by interest rate changes. 
7.2 Treasury Management Mandatory Indicator: Maturity Structure of Borrowing
7.2.1 The Treasury Management Code requires the Council to specify upper and lower limits regarding
the maturity structure of its long-term borrowing in order to minimise the risk associated with the
Council having to replace large sums of long-term debt at a time when there may be uncertainty
over interest rate exposure.
7.2.2 Table 3 illustrates that the Council has high levels of fixed rate debt however the current maturity
profile of this debt is unlikely to be a major risk factor for the Council. The limits of fixed and
variable rate maturity are set out within Table 5 below; 
7.2.3 The upper limit for long-term rate debt, maturing in less than 12 months, is set at 15.0% to
accommodate the requirement within CIPFA TM Code to recognise the possibility of the Council
loans classified as LOBO type loans having their option or call exercised within the next 12
months, under the terms of the loans as described within paragraph 4.14 above.
7.3 Treasury Management Indicator: Credit Risk
7.3.1 The Council will manage its credit risk by implementing the investment strategy per Section 5 and
remaining within the guidelines outlined within Annex C. 
7.3.2 The Council has also adopted a voluntary measure of its exposure to credit risk by monitoring the 
value weighted average credit rating of its investment portfolio. This is calculated by applying a
score to each investment and taking the arithmetic average weighted by the size of each
investment. 
Target
Portfolio Average Credit Rating A-                      
Table 6 – Credit Risk Indicator 2025/26
8.0 Prudential Indicators 2025/2026 to 2029/2030
8.1 Prudential Indicator:  The Capital Expenditure Plans
8.1.1 The Prudential Code requires the Council to outline its capital expenditure plans taking into
account the sources of funding available and also the cost to the council in supporting any
additional borrowing burden which will require to be paid for from the Council’s own resources.
The Government has power to control the level of prudential borrowing although no control has
yet been implemented. Some of the estimates for other sources of funding may also be subject
to change over this timescale.
8.1.2 Table 7 sets out the revised Capital Expenditure plans for 2024/2025 (Outturn) and forecast for
the period 2025/2026 to 2028/2029 as per the 5-year Strategic Capital Investment Programme
approved by the Policy and Strategy Committee on 14 March 2024, and reviewed on a
continual basis by the Strategic Capital Delivery Group (SCDG) including re-profiling
adjustments within the 5 year programme. It should be noted therefore that the estimates
presented within this report are based on the current forecasts of the progression of the
programme and projected resources available.
Financial Year:  2025/2026 Estimate £m +1%
£m
-1%
£m
Net Impact on Council (1.3) (0.4) +0.4
Table 4 - Sensitivity to Interest Rate Movements 2025/26
Maturity Structure of Borrowing <12 months 12m to
2 years
2 to
5 yrs
5 to
10 yrs
10 to
20 yrs
20 to
40 yrs 40 yrs+
Upper limit - long term debt 15.00% 15.00% 25.00% 30.00% 35.00% 45.00% 30.00%
Lower limit - long term debt 0.00% 0.00% 5.00% 5.00% 5.00% 10.00% 0.00%
Table 5 - Maturity Structure of Fixed Rate Borrowing
Page 287 of 376

Page 288

Appendix 1 
Treasury Management Strategy 2025/2026, Treasury Management Indicators and  
Prudential Indicators 2025/2026 to 2028/2029 
8.1.3 General Services within Table 7 above encompasses the Capital Financing Requirement,
reflecting the borrowing needs, for the General Fund Community Investment Programme which
includes City Deal, Town and Community Hubs, Maintaining Existing Assets, Office
Rationalisation & Carbon Management, Greenspace & Cemeteries, Roads & Street Lighting,
Operational, Infrastructure & Transportation Development, Economic Regeneration, Digital
Infrastructure & Innovation and Community Board Investment Fund, whilst HRA includes the New
Build, Buy Back Scheme, Mainstream and Ambition programmes. 
8.1.4 For 2024/2025, an estimate of £89.3m has been included to reflect the potential implications of
IFRS16 Leases in respect of the recalculation of PPP finance leasing arrangements and the
reclassification for buildings, vehicle and plant currently accounted for as operational leases within
revenue currently managed outwith the prudential framework until changes are adopted by the
Council on 1 April 2024. For 2025/2026 to 2029/30, further estimates of £19.8m are included for
future estimates of recalculation of lease liabilities. Members should note that this is a change in
accounting treatment of leases and does not represent additional cash expenditure.
8.2 Prudential Indicator: Capital Financing Requirement (CFR)
8.2.1 The CFR is essentially a measure of Council’s underlying borrowing need i.e. capital expenditure
which is not resourced by capital grants, receipts or CFCR - and any new borrowing will increase
the CFR. The CFR includes long term liabilities representing outstanding obligations under the
education PPP/DBFM finance leasing arrangements and the Clyde Valley Waste Facility plus
IFRS16 Leases implications. 
8.2.2 However the Council pays off an element of the accumulated capital spend each year through a
revenue charge, comprising scheduled debt repayments from service departments (annuity
based) which reduces the CFR. Committee is asked to approve the CFR projections at the 31
March for each financial year set out below. 
Capital Expenditure
2024/25
Outturn
£m
2025/26
Forecast
£m
2026/27
Forecast
£m
2027/28
Forecast
£m
2028/29
Forecast
£m
2029/30
Forecast
£m
Capital Expenditure: General Services 129.8 153.4 140.7 122.5 141.1 104.6
Capital Expenditure: HRA 109.8 125.8 220.3 189.5 157.6 179.4
Total Capital by Expenditure 239.6 279.2 361.1 312.0 298.7 284.0
IFRS16: Vehicles & Buildings 2.2 0.0 0.0 0.0 0.0 0.0
IFRS16: PPP Contracts 87.1 5.4 4.1 4.7 2.4 3.3
Service Concessions:  PPP Schools 9.4 9.1 11.3 11.4 12.6 12.1
Total Capital by Credit Arrangements 98.7 14.4 15.5 16.1 15.0 15.4
Total Capital Investment 338.3 293.6 376.5 328.1 313.7 299.5
Financed By:
Capital Grants 55.8 59.5 44.5 44.6 52.0 30.0
Capital from Current Revenue 45.1 46.8 20.1 20.1 20.1 20.1
Capital Receipts 6.4 3.4 3.4 3.4 3.4 0.0
CFR: Borrowing: General Services 58.2 84.2 109.9 91.5 102.7 91.7
CFR: Borrowing: HRA 74.2 85.4 183.2 152.4 120.5 142.3
Credit Arrangements 98.7 14.4 15.5 16.1 15.0 15.4
Total Capital Funding Resources 338.3 293.6 376.5 328.1 313.7 299.5
Table 7 - Capital Expenditure Plans 2024/25 to 2029/30
Page 288 of 376

Page 289

Appendix 1 
Treasury Management Strategy 2025/2026, Treasury Management Indicators and  
Prudential Indicators 2025/2026 to 2028/2029 
8.2.3 The year-on-year movement in CFR is shown in Table 9 below. 
8.2.4 The scheduled loan debt, education PPP amortisation and credit arrangement figures presented
within Table 9 above are based on the estimated profile of the Strategic Capital Investment
Programme 2025/2026 to 2028/2029, and implementation of the changes to accounting for
service concessions as a result of Scottish Government fiscal flexibilities options applied in
2023/2024 and IFRS16 Leases in 2024/2025.
8.3 Prudential Indicator: Gross Debt and the Capital Financing Requirement:
8.3.1 Within the prudential indicators there are a number of key indicators to ensure the Council
operates its activities within well-defined limits. For the first of these the Council needs to ensure
that its total borrowing, does not, except in the short-term, exceed the total of the CFR in the
preceding year plus the estimates of any additional CFR for 2025/2026 and the next two financial
years. 
8.3.2 The above table demonstrates that healthy prudential margins will continue to exist from
2025/2026 onwards and that the Council complies with this prudential indicator in the current year
and does not envisage difficulties in the future. This view takes into account current commitments,
existing plans and the proposals in respect of the capital investment levels proposed.  
Capital Financing Requirement
2024/25
Outturn
£m
2025/26
Forecast
£m
2026/27
Forecast
£m
2027/28
Forecast
£m
2028/29
Forecast
£m
2029/30
Forecast
£m
General Services 1,008.0 1,080.8 1,176.6 1,252.7 1,335.9 1,406.9
HRA 569.6 640.6 808.1 942.8 1,043.0 1,162.8
Total CFR 1,577.6 1,721.4 1,984.7 2,195.5 2,378.9 2,569.7
Movement in CFR 193.1 143.8 263.3 210.8 183.4 190.8
Table 8 - CFR Projections 2024/25 to 2029/30
2024/25
Outturn
£m
2025/26
Forecast
£m
2026/27
Forecast
£m
2027/28
Forecast
£m
2028/29
Forecast
£m
2029/30
Forecast
£m
CFR  : Borrowing : General Services 58.2 84.2 109.9 91.5 102.7 91.8
CFR  : Borrowing : HRA 74.2 85.4 183.2 152.4 120.5 142.3
Credit Arrangements 98.7 14.4 15.5 16.1 15.0 15.4
Scheduled Loan Debt Amortisation (24.0) (26.4) (29.1) (32.5) (36.8) (41.2)
Leasing Amortisation (0.9) (0.9) (0.8) (0.8) (0.8) (0.5)
Education PPP Amortisation (13.1) (12.9) (15.4) (15.8) (17.3) (17.0)
Movement in CFR 193.1 143.8 263.3 210.8 183.4 190.8
Table 9 - Movements in CFR 2024/25 to 2029/30
2024/25
Outturn
£m
2025/26
Forecast
£m
2026/27
Forecast
£m
2027/28
Forecast
£m
2028/29
Forecast
£m
2029/30
Forecast
£m
Gross Borrowing : Loan Debt 1,002.1 1,186.8 1,467.2 1,736.9 1,941.3 2,128.1
Long Term Liabilities 293.4 294.0 293.2 292.7 289.6 287.5
Gross Debt 1,295.5 1,480.7 1,760.4 2,029.6 2,230.9 2,415.7
Capital Financing Requirement 1,577.6 1,721.4 1,984.7 2,195.5 2,378.9 2,569.6
Prudential Margin 282.1 240.6 224.3 166.0 148.0 154.0
Gross Debt =< Future 3 Year CFR Yes Yes Yes Yes Yes Yes
Table 10 - Prudential Margins 2024/25 to 2029/30
Page 289 of 376

Page 290

Appendix 1 
Treasury Management Strategy 2025/2026, Treasury Management Indicators and  
Prudential Indicators 2025/2026 to 2028/2029 
8.4 Prudential Indicator: Liability Benchmark
8.4.1 The Treasury Management Code states that organisations should evaluate the amount, timing
and maturities needed for new borrowing in relation to planned borrowing needs, for example
using a liability benchmark, in order to avoid borrowing too much, too little, too long or too short.
The liability benchmark is an important tool to help establish whether the Council is likely to be a
long-term borrower or long-term investor in the future, and so shapes its strategic focus and
decision making. Essentially this benchmark identifies the projection of external debt/ borrowing
required over the long term to fund approved revenue & capital budgets, while keeping treasury
investments at the minimum level required to manage day-to-day cash flow. 
8.4.2 This represents the comparison of the Council’s actual borrowing against an alternative strategy.
A liability benchmark has been calculated showing the lowest risk level of borrowing. This utilises
the forecasts for Capital Financing Requirement, long-term liabilities, current external borrowing,
balance sheet resources i.e. reserves, and that cash and investment balances are kept to a
minimum of £30.0m at each year-end to maintain sufficient liquidity but minimise credit risk. 
8.4.3 This is shown in the chart below together with the maturity profile of the Council’s existing
borrowing; 
31/3/24
Actual
£m
31/3/25
Forecast
£m
31/3/26
Forecast
£m
31/3/27
Forecast
£m
31/3/28
Forecast
£m
31/3/29
Forecast
£m
31/3/30
Forecast
£m
Loans CFR 1,175.8 1,284.2 1,427.4 1,691.5 1,902.8 2,089.3 2,282.1
less Balance Sheet Resources (369.5) (372.6) (330.8) (313.9) (254.8) (242.5) (250.4)
Net Loans Requirement 806.3 911.7 1,096.7 1,377.6 1,648.0 1,846.8 2,031.7
plus: Liquidity Allowance 30.0 30.0 30.0 30.0 30.0 30.0 30.0
Liability Benchmark 836.3 941.7 1,126.7 1,407.6 1,678.0 1,876.8 2,061.7
Existing Borrowing 866.9 872.1 628.7 577.6 533.2 493.0 453.4
New Borrowing Required 0.0 69.6 497.9 830.1 1,144.8 1,383.8 1,608.4
0
500
1,000
1,500
2,000
2,500
2024 2026 2028 2030 2032 2034 2036 2038 2040 2042 2044 2046 2048 2050 2052 2054
£m
Liability Benchmark - North Lanarkshire
Fixed rate loans LOBO loans Loans CFR Liability benchmark Net loans requirementPage 290 of 376

Page 291

Appendix 1 
Treasury Management Strategy 2025/2026, Treasury Management Indicators and  
Prudential Indicators 2025/2026 to 2028/2029 
8.4.4 The Loans CFR line (solid light blue) represents the total cost of the capital expenditure plans
based on the estimated profile of the Strategic Capital Investment Programme 2025/2026 to
2028/2029. This reduces over time as scheduled principal repayments are made to the loans
fund. The Net Loans Requirement line (dotted red) represents the minimum external borrowing
required to fund the current capital expenditure plans assuming all cash reserves and balances
are utilised to offset borrowing requirements.  The Liability Benchmark line (solid red) represents
the estimated borrowing required, taken account of liquidity allowance required of £30.0m to be
held to maintain liquidity and to manage day-to-day cashflows.
8.4.5 The solid grey section shows the maturity profile of current borrowing. The gap between the grey
section and the liability benchmark line represents the estimated additional borrowing that is
forecast will be required to fund the current capital expenditure plans, via long-term and short-
term borrowing options.
8.5 Prudential Indicator: The Authorised Limit for External Debt.
8.5.1 This represents the maximum limit beyond which borrowing is prohibited. Although this limit is
deemed to be affordable in the short-term, it is not desirable or a sustainable level of borrowing
for the council and is therefore being set at a level as the maximum allowable in each of the years
2025/2026 through to 2029/2030. The initial level set for 2024/2025 is shown for comparison. The
Local Authority (Capital Finance and Accounting) (Scotland) Regulations 2016 provide a statutory
backing to the Prudential Code requirement for an authority to set an authorised limit for external
debt. 
8.6 Prudential Indicator: The Operational Boundary for External Debt. 
8.6.1 This indicator is based on the expected maximum external debt during the course of the year; it
is not a limit. This operational boundary allows flexibility to borrow, re-invest and undertake debt
restructuring during the course of the year. It is therefore possible and acceptable, for actual
borrowing to vary around this boundary for short periods during the year. 
8.7 Prudential Indicators: Affordability 
8.7.1 The previous sections cover the treasury management and overall capital and control of
borrowing prudential indicators, but within this framework, prudential indicators are required to
assess the affordability of the capital investment plans. These provide an indication of the impact
of the capital investment plans on the overall Council finances. The Council is asked to approve
the following affordability indicator.
8.8 Prudential Indicator: The Proportion of Financing Costs to Net Revenue Stream.
8.8.1 Since capital expenditure impacts on the revenue budget through financing charges, the Council
needs to ensure that financing costs not only remain affordable, but also do not constitute an
excessive proportion of the revenue resources available. The proportion of capital financing costs 
Authorised Limit
2024/25
Initial Limit
£m
2025/26
Estimated
£m
2026/27
Estimated
£m
2027/28
Estimated
£m
2028/29
Estimated
£m
2029/30
Estimated
£m
Gross Borrowing : Loan Debt 1,270.0 1,505.0 1,770.0 2,005.0 2,204.0 2,320.0
Long Term Liabilities 325.0 325.0 325.0 325.0 320.0 320.0
Total External Debt 1,595.0 1,830.0 2,095.0 2,330.0 2,524.0 2,640.0
Table 11 - Authorised Limit 2024/25 to 2029/30
Operational Boundary
2024/25
Initial Limit
£m
2025/26
Estimated
£m
2026/27
Estimated
£m
2027/28
Estimated
£m
2028/29
Estimated
£m
2029/30
Estimated
£m
Gross Borrowing : Loan Debt 1,220.0 1,455.0 1,720.0 1,955.0 2,154.0 2,270.0
Long Term Liabilities 325.0 325.0 325.0 325.0 320.0 320.0
Total External Debt 1,545.0 1,780.0 2,045.0 2,280.0 2,474.0 2,590.0
Table 12 - Operational Boundary 2024/25 to 2029/30
Page 291 of 376

Page 292

Appendix 1 
Treasury Management Strategy 2025/2026, Treasury Management Indicators and  
Prudential Indicators 2025/2026 to 2028/2029 
to revenue forecasts for the next 3 years are illustrated in Table 13 below showing that the General
Services loan charges represent up to 8.49% of the total revenue budget available. The increase
in the proportion still remains within prudent levels demonstrating that the capital programme
investment appears to be affordable and sustainable.
8.8.2 In noting the percentage on loan charges within the HRA budget, a major element of revenue
costs in the Housing Account is the funding support to sustain the substantial investment
programme; the other main elements of expenditure being repair costs and management costs.
The level of loan charges is acceptable and deemed prudent and affordable within the framework
of the Council’s 30-year Housing investment plan. 
8.8.3 The scheduled loan debt, education PPP amortisation and credit arrangement figures presented
within Table 9 above are based on the estimated profile of the Strategic Capital Investment
Programme 2025/2026 to 2028/2029, and implementation of the changes to accounting for
service concessions as a result of Scottish Government fiscal flexibilities options applied in
2023/2024 and IFRS16 Leases in 2024/2025.
8.9 Prudential Indicator: Affordability – Sensitivity Analysis 
8.9.1  For the Prudential Indicators relating to affordability, the table within Annex E provides a summary
of the sensitivity of the most likely outcomes outlined within the preceding paragraphs provided
above to the following movements, all assessed independently of each other:
(i) a plus or minus 10% change in the capital financing requirement i.e. the level of borrowing
undertaken to retain average investment balances and under borrowing position at prudent levels.
(ii) a plus or minus 50 bps change in the interest rates achievable for new long-term borrowing i.e.
½ percent movement 
(iii) a plus or minus 10% change in the net revenue stream used to calculate the proportion of
financing costs to net revenue stream.  
2025/26
Estimated
£m
2026/27
Estimated
£m
2027/28
Estimated
£m
2028/29
Estimated
£m
2029/30
Estimated
£m
Total General Fund (GF) Loan Charges 46.6 53.7 61.9 68.8 76.7
Total General Fund Finance Lease / PPP Costs 15.3 15.1 14.9 14.6 14.1
Total General Fund : Capital Financing Costs 61.9 68.8 76.7 83.5 90.7
General Fund : Net Revenue Stream 1,068.8 1,068.8 1,068.8 1,068.8 1,068.8
5.79% 6.44% 7.18% 7.81% 8.49%
43.3 49.9 61.2 71.9 80.9
0.3 0.3 0.3 0.3 0.0
Total HRA : Capital Financing Costs 43.6 50.2 61.6 72.2 80.9
HRA : Net Revenue Stream 171.9 175.3 188.6 201.6 209.2
25.39% 28.64% 32.65% 35.78% 38.69%
Table 13 - Proportion of Financing Costs to Net Revenue Stream 2025/26 to 2029/30
Proportion of Financing Costs to Net Revenue
Stream
GF - Proportion of Financing Costs to Net
Revenue Stream
HRA - Proportion of Financing Costs to Net
Revenue Stream
Total Housing Reveue Account (HRA) Loan Charges
Total Housing Reveue Account Finance Lease Costs
Page 292 of 376

Page 293

Appendix 1 
Treasury Management Strategy 2025/2026, Treasury Management Indicators and  
Prudential Indicators 2025/2026 to 2028/2029 
9.0 Policy on Repayment of Loans Fund Advances 2025/2026 
9.1 The Local Authority (Capital Finance and Accounting) (Scotland) Regulations 2016 (as amended
in 2024) within Regulation 13 require the Council to make a loans fund advance equal to the
amount of capital expenditure that the Council has determined will be financed by borrowing. The
Capital Expenditure definition being that adopted by proper accounting practice, the statutory
control framework and the Prudential Code.
9.2 Loans fund advances also incorporate grants to third parties on third party assets and loans to
third parties where the other party meets the criteria laid out within Part 3 of the Regulations e.g.
other local authorities or joint boards.
9.3  Accounting for loans fund advances also changed from 1st April 2016. Prudent repayment of
loans fund advances are required to be made in line with Scottish Government Statutory
Guidance on Loans Fund Accounting (Circular 7/16). 
9.4 The broad aim of prudent repayment is to ensure that the Authority’s unfinanced capital
expenditure is financed over a period of years which that expenditure is expected to provide a
benefit, and that each year's repayment amount is reasonably commensurate with the period and
pattern of the benefits. Where a loans fund advance is made for an asset, that period will be the
asset’s useful life. Where an asset life cannot reasonably be established, the repayment period
will not exceed 50 years.
9.5 The statutory guidance requires the Council to approve a policy on loans fund repayments each
year and it is proposed the Council adopts the following options for calculating prudent
repayments in 2025/26.
9.6 For pre-existing Loans Fund advances made up to 31st March 2016 and for the most part capital
expenditure plans for the period up to and including the 31 March 2021, the Council continued to
use Option 1: Statutory Method. This approach taking into account the 5-year transitional period
from 31/3/2016 to 31/3/2021 available within the new guidance, during which the current
methodology may continue to be selected.  The repayment of Loans Fund advances therefore
being equal to the annual amount determined in accordance with Schedule 3 of the Local
Government (Scotland) Act 1975.
9.7 However the Council undertook an initial review of the loans fund advances annuity models in
2021/22 and a review of the initial asset lives adopted and determined it would be prudent to
adopt Option 3: Asset Life Method, with the Council applying this option accordingly for
2020/2021. This approach allowed a retrospective review for ‘prudent repayment’ of all historic
loans fund advances outstanding at 31 March 2020 with no distinction made between debt held
prior to 31 March 2016 and since the prudent repayment methodology was introduced on 1 April
2016. 
9.8 Following this initial exercise, a further review was carried out during 2020/2021 in conjunction
with Treasury specialists to investigate further adaptations to the repayments policy. Per the
report submitted to this Committee on the 26 November 2020 entitled Loans Fund Advance
Repayment Policy Review a revised policy was approved. 
9.9 This included the application of a fixed average life to all loans fund advances, and changes to
the annuity rate adopted to calculate loans fund advance repayments, including the retrospective
adjustment to the period over which historic loans fund advance repayments can be made and
applying this approach to future loans fund advances going forward. The repayment periods and
annuity rate can be updated in future years, if deemed prudent to do so, to reflect the changing
nature and durability of assets financed by loans fund advances linked to Treasury Management
strategy. 
9.10 The revised Policy resulted in a revised loans fund advance repayment profile, the Council
adopting the flexibility within the policy and will consider alternative approaches including
reprofiling back to initial advance date.  A prudent approach specific to the Council’s financial
position will be adopted including an assessment of the whole life impact both in nominal and
NPV terms of this proposal.
9.11 Alternatively if it is determined that it may be prudent to recognise grant funding or other income
streams when determining both the period of the repayment and/or the annual repayment of any 
Page 293 of 376

Page 294

Appendix 1 
Treasury Management Strategy 2025/2026, Treasury Management Indicators and  
Prudential Indicators 2025/2026 to 2028/2029 
loans fund advance, Option 4 Funding/Income profile method will be selected. Some examples
of where this income approach may be considered prudent would include the deferred UK and
Scottish Government grant support for the City Deal. Therefore, for capital expenditure incurred
for specified projects where it is reasonable to link an income /funding stream, the annual
repayment of Loans Fund advances may be profiled to reflect the income/funding stream. The
Council will keep the income streams under review to ensure the provision for repayment remains
prudent and, if required, address any shortfall.
9.12 The Statutory Guidance, allows a further option referred to as Option 2: the Depreciation method
within the guidance and after due consideration the Council did not adopt this in 2021/2022. 
9.13 The Council made use of the permitted short-term financial flexibility to defer Loans Fund
repayments in 2022/23 which has resulted in higher repayments in the following 20 years.
9.14 In accordance with the Statutory Guidance, the Council has outlined within Annex F its
commitments in respect of loans fund advance repayments, however these are based on the
estimated profile of the Strategic Capital Investment Programme 2025/2026 to 2028/2029 and
the implementation of approved loans funds advance repayment policy and service concessions
arrangements. Material changes to these estimates/forecasts will be reported during the quarterly
Treasury Management Monitoring Process. 
9.15 In accordance with the statutory guidance the HRA Loans Fund advances and associated annual
repayments have been identified separately from that of the General Fund.
9.16 Loans Fund advances are not made for credit arrangements such as leases and service
concession (PFI/PPP) arrangements, but a statutory charge to revenue similar to a Loans Fund
repayment is made to repay the associated debt. Except where flexible arrangements have
previously been approved, the charge will be equal to the contractual unitary payment due for the
financial year after deducting (a) those amounts which have been already charged to revenue
such as interest and (b) actual or prepaid lifecycle replacement costs.
Page 294 of 376

Page 295

Annex A
Treasury Management Policy Statement & Clauses adopted 
The Treasury Management Policy Statement adopted by North Lanarkshire Council: 
1. The Council defines its Treasury Management activities as:
“The management of the organisation’s borrowing investments and cash flows, its banking,
money market and capital market transactions; the effective control of the risks associated
with those activities; and the pursuit of optimum performance consistent with those risks.”
2. The Council regards the successful identification, monitoring and control of risk to be the
prime criteria by which the effectiveness of its treasury management activities will be
measured. Accordingly, the analysis and reporting of treasury management activities will
focus on their risk implications for the Council and any financial instruments entered into to
manage these risks.
3. The Council acknowledges that effective treasury management will provide support towards
the achievement of its business and service objectives. It is therefore committed to the
principles of achieving value for money in treasury management, and to employing suitable
comprehensive performance measurement techniques, within the context of effective risk
management.
4. The Council adopts a high-level approach to setting policies for borrowing and investment
activity having in place an appropriate scheme of delegation and ensuring all staff employed
in Treasury Management have the suitable skills and resources to carry out delegated
treasury management activities effectively, efficiently and achieving value for money. 
CIPFA Treasury Management code clauses formally adopted by North Lanarkshire
Council:
1. This Council will create and maintain, as the cornerstones for effective treasury management:
•  A treasury management policy statement, stating the policies, objectives and approach
to risk management of its treasury management activities;
• Suitable treasury management practices (TMPs), setting out the manner in which the
Council will seek to achieve those policies and objectives, and prescribing how it will
manage and control those activities.
2. The Council will receive reports on its treasury management policies, practices and activities,
including as a minimum, an annual strategy and plan in advance of the year, a mid-year
review and an annual report after its close, in the form prescribed in its TMPs.
3. The Council delegates responsibility for the development of the Treasury Management
Strategy and implementation and monitoring of its treasury management policies and
practices to the Finance and Resources Committee and for the execution and administration
of treasury management decisions to the Chief Officer (Finance), who will act in accordance
with the Council's Treasury Policy statement and TMPs and CIPFA's Standard of
Professional Practice on Treasury Management.
4. The Audit and Scrutiny Panel will be responsible for ensuring effective scrutiny of the
Treasury Management Strategy and policies as part of its work on reviewing the internal
financial controls of the Council.
5. In accordance with The Local Government Investments (Scotland) Regulations 2010, the
Council is responsible for the approval of the Annual Investment Strategy and Annual
Investment Report. 
Page 295 of 376

Page 296

Annex B
Explanation of Long-Term Rating Definitions 
Type of Rating Rating Explanation
Fitch – long-term
AAA
Indicates exceptionally strong capacity for timely payment of
financial commitments and this capacity is highly unlikely to be
adversely affected by foreseeable events. 
AA-
Indicates very strong capacity for timely payment of financial
commitments and this capacity is not significantly vulnerable to
foreseeable events. 
A-
Indicates strong capacity for timely payment of financial
commitments. This capacity may, nevertheless, be more
vulnerable to changes in circumstances or in economic
conditions than is the case for higher ratings.
BBB
Indicates an adequate capacity for timely payment of financial
commitments but adverse business or economic conditions
more likely to impair this capacity. 
Moody’s – long-term
Aaa
Offer excellent credit quality, with susceptibility to long-term
risks that are mostly unlikely to materially impair the banks
strong position.
Aa
Offer excellent credit quality, with susceptibility to long-term
risks with a vulnerability to greater fluctuations within
protective elements.
A Offer excellent credit quality, but elements suggest a
susceptibility to impairment over the long-term.
Baa Rated as medium grade, with some speculative elements and
moderate credit risk.
Standard & Poor’s -
long-term AAA Indicates extremely strong capacity for timely payment of
financial commitments
AA- Indicates very strong capacity for timely payment of financial
commitments 
A-
Indicates strong capacity for timely payment of financial
commitments This capacity may, nevertheless, be more
susceptible to the adverse effects of changes in circumstances
or in economic conditions than is the case for higher rated
category.
BBB
Indicates an adequate capacity for timely payment of financial
commitments but adverse business or economic conditions
more likely to impair this capacity. 
Page 296 of 376

Page 297

Annex C
Permitted Investments, Associated Controls, Credit Rating, Money and Time Limits 
Type of Investment Treasury Management Risks Mitigating Controls Credit Rating
Money
Limits
Time   
Limits
a. Deposits with the Debt
Management Account
Facility (UK Government). 
Deposit with the UK Government and
as such credit/counterparty and
liquidity risk is very low, and there is
no market risk to the principal sum.
Little mitigating controls required
as this is a UK Government
investment. The monetary limit is
unlimited to allow for a safe
haven for investments. The
sovereign rating is monitored with
the impact of any changes to this
sovereign rating evaluated and
removal of the investment from
the permitted list if necessary.
Long-term
rating
n/a No limit  O/night 
b. Deposits with other local
authorities or public
bodies 
Quasi UK Government debt and as
such credit/counterparty risk is very
low, and there is no market risk to
principal sum.  Liquidity may present
a problem as deposits can only be
broken with the agreement of the
counterparty, and penalties can
apply. 
Little mitigating controls required
for local authority deposits, as
this is a quasi-UK Government
investment. The sovereign rating
is monitored with the impact of
any changes to this sovereign
rating evaluated and removal of
the investment from the permitted
list if necessary.
Long-term
rating 
n/a £20m Up to a
max
period of 3
years
c. Instant Access Accounts  These tend to be low risk
investments but will exhibit higher
risks than categories (a) and (b)
above.
These investments are subject to risk
of loss via bail-in should the regulator
determine that the bank is failing or
likely to fail. 
Lending will be restricted to those
counterparties meeting the credit
rating criteria with the selection
defaulting to the lowest available
credit rating to provide additional
risk control measures.
Assessment of credit worthiness
will be further strengthened by
the use of additional market
intelligence including credit
default swaps, sovereign support
and share price data. 
Long-term
rating 
Above or
equal to A-
or
equivalent
£20m Daily
access if
required
BBB or
equivalent
£10m
Page 297 of 376

Page 298

Annex C
Permitted Investments, Associated Controls, Credit Rating, Money and Time Limits 
Type of Investment Treasury Management Risks Mitigating Controls Credit Rating
Money
Limits
Time   
Limits
d. Call Accounts These tend to be low risk
investments but will exhibit higher
risks than categories (a) to (c) above. 
With this type of investment liquidity
can be low or high, determined by
the call account facility adopted e.g.
35 days. Call deposits can only be
broken with the agreement of the
counterparty, and penalties may
apply.
These investments are subject to risk
of loss via bail-in should the regulator
determine that the bank is failing or
likely to fail.
Lending will be restricted to those
counterparties meeting the credit
rating criteria with the selection
defaulting to the lowest available
credit rating to provide additional
risk control measures.
Assessment of credit worthiness
will be further strengthened by
the use of additional market
intelligence including credit
default swaps, sovereign support
and share price data.
Long-term
rating 
Above or
equal to A- or
equivalent
£20m up to a
max of
364 days 
BBB or
equivalent
£10m up to a
max of 30
days.
e. Term Deposits  These tend to be low risk
investments but will exhibit higher
risks than categories (a) to (d)
above. With this type of investment,
liquidity is low, and term deposits can
only be broken with the agreement of
the counterparty, and penalties may
apply. 
These investments are subject to risk
of loss via bail-in should the regulator
determine that the bank is failing or
likely to fail. 
Lending will be restricted to those
counterparties meeting the credit
rating criteria with the selection
defaulting to the lowest available
credit rating to provide additional
risk control measures.
Assessment of credit worthiness
will be further strengthened by
the use of additional market
intelligence including credit
default swaps, sovereign support
and share price data.
Long-term
rating 
Above or
equal to A- or
equivalent
£20m up to a
max of
364 days.
BBB or
equivalent
£10m up to a
max of 30
days.
Page 298 of 376

Page 299

Annex C
Permitted Investments, Associated Controls, Credit Rating, Money and Time Limits 
Type of Investment Treasury Management Risks Mitigating Controls Credit Rating
Money
Limits
Time   
Limits
f. Money Market Funds
(MMFs)
The Council is no longer guaranteed
preservation of capital i.e. for every £1
of principal invested the fund will no
longer guarantee a return £1 of
principal on withdrawal.
However the day to day operation of
LVNAV funds is very similar and has
many of the attractive features of the
former Constant Net Asset Value
(CNAV) fund and the probability of
the price changing and loss of
capital, within the boundaries set for
price changes i.e. “the collar”, is
widely regarded as de minimis. 
Two types of funds are available
to the Council   
• a Public Debt CNAV (assets
invested in government debt);
and
•  a ‘Low Volatility NAV’
(LVNAV) 
The Council will not use Variable
NAV Funds.
Assessment of credit worthiness
will be underpinned by additional
market intelligence including
credit default swaps, sovereign
support and share price data and
information regularly received
from the Council’s Treasury
Advisors Arlingclose Ltd. 
Long-term
rating
n/a £10m
per
MMF
fund up
to a
max of
£40m
in total
or 0.5%
of fund
size. 
Daily
access if
required 
g. Instant Access Funds
held with Council’s own
bankers 
These tend to be low risk
investments but will exhibit higher
risks than categories (a), (b) and (c)
above. 
These investments are subject to risk
of loss via bail-in should the regulator
determine that the bank is failing or
likely to fail. 
If the council’s own bankers fail to
meet the credit rating criteria per
c) above, for operational
purposes limited funds may be
held within this account but the
Council will ensure funds kept at
the lowest levels manageable
Long-term
rating
n/a n/a Overnight
basis only
Page 299 of 376

Page 300

Annex C
Permitted Investments, Associated Controls, Credit Rating, Money and Time Limits 
Type of Investment Treasury Management Risks Mitigating Controls Credit Rating
Money
Limits
Time   
Limits
h. Government Gilts and
Treasury Bills 
These are marketable securities
issued by the UK Government and
as such counterparty and liquidity
risk is very low, although there is
potential risk to the market value
arising from an adverse movement in
interest rates (no loss if these are
held to maturity).
Little mitigating controls required
as this is a UK Government
investment. The monetary limit is
unlimited to allow for a safe
haven for investments. Any
changes to the sovereign rating is
evaluated and the removal of this
type of investment from the
permitted list if necessary.
Assessment of credit worthiness
will be further strengthened by
additional market intelligence
including credit default swaps,
sovereign support and share
price data.
Cashflow management tools will
endeavour to ensure that this
type of investment is held until
maturity to limit market risk.
Long-term
rating
n/a No limit Up to a
max
period of 5
years 
i. Supranational Bonds  These are bonds issued by
institutions such as the European
Investment Bank (EIB) and the World
Bank as such counterparty and
liquidity risk is very low, although
there is potential market risk to
principal amount arising from an
adverse movement in interest rates
(no loss if these are held to maturity). 
Lending restricted to those
meeting credit rating criteria.
Assessment of credit worthiness
will be further strengthened by
the use of additional market
intelligence including credit
default swaps, sovereign support
and share price data.
Cashflow management tools will
endeavour to ensure that this
type of investment is held until
maturity to limit market risk 
Long-term
rating 
A- or
equivalent
£20m max
period of 5
years.
Page 300 of 376

Page 301

Annex C
Permitted Investments, Associated Controls, Credit Rating, Money and Time Limits 
Type of Investment Treasury Management Risks Mitigating Controls Credit Rating
Money
Limits
Time   
Limits
j. Certificates of deposits
with financial institutions 
These are short dated marketable
securities issued by financial
institutions and as such counterparty
risk is low but will exhibit higher risks
than categories (a) to (h) above. 
There is risk to value of capital loss
arising from selling ahead of maturity
if combined with an adverse
movement in interest rates. Liquidity
risk will normally be low. 
Lending will be restricted to those
counterparties meeting the credit
rating criteria with the selection
defaulting to the lowest available
credit rating to provide additional
risk control measures. 
Assessment of credit worthiness
will be further strengthened by
the use of additional market
intelligence including credit
default swaps, sovereign support
and share price data.
Long-term
rating 
A- or
equivalent
£20m Up to a
max
period of
364 days.
k. Covered Bonds  These are bonds issued by financial
institutions and guaranteed by a
group company that holds mortgage
assets. There is risk of capital loss
arising from selling ahead of maturity
if combined with an adverse
movement in interest rates. Liquidity
risk will normally be low as highly
liquid market. 
These investments are exempt from
the bail-in provisions should the
regulator determine that the bank is
failing or likely to fail.
These investments are secured
on the borrower’s assets up to a
value of 125% of the principal
amount which limits the potential
losses in the event of default. 
Process in place to monitor the
value of the cover arrangements
throughout the bond term. i.e.
value of assets providing security 
Bonds will be restricted to those
meeting credit rating criteria.
Assessment of credit worthiness
will be further strengthened by
the use of additional market
intelligence including credit
default swaps, sovereign support
and share price data.
Cashflow management tools will
endeavour to ensure that this
type of investment is held until
maturity to limit market risk. 
Long-term
rating 
A- or
equivalent
(Criteria
required for
the covered
bond.)
£20m Up to 5
years. 
BBB or
equivalent
(Criteria
required for
the covered
bond.)
£10m Up to 6
months.
Page 301 of 376

Page 302

Annex C
Permitted Investments, Associated Controls, Credit Rating, Money and Time Limits 
Type of Investment Treasury Management Risks Mitigating Controls Credit Rating
Money
Limits
Time   
Limits
l. Reverse repurchase
agreements and other
collateralised
arrangements
These are bonds issued by financial
institutions with collateral provided by
the lender to the Council by
transferring the custody and title to
bonds or other investment securities
valued at a price above par e.g.
105% of the principal amount. There
is risk of capital loss arising from
selling ahead of maturity if combined
with an adverse movement in
interest rates.  Liquidity risk will
normally be low as highly liquid
market. 
These investments are exempt from
the bail-in provisions should the
regulator determine that the bank is
failing or likely to fail.
These investments are secured
by the borrower giving the
Council custody and title to
marketable securities valued
above par that will be retained in
the event of default  
Process in place to monitor the
value of the collateral in place
throughout the bond term to
ensure adequate cover. 
Collateral arrangements will be
restricted to those meeting credit
rating criteria.
Assessment of credit worthiness
will be further strengthened by
the use of additional market
intelligence including credit
default swaps, sovereign support
and share price data.
Cashflow management tools will
endeavour to ensure that this
type of investment is held until
maturity to limit market risk 
Long-term
rating 
A- or
equivalent
(Criteria
required for
collateral
arrangement)
£20m Up to 5
years. 
BBB or
equivalent
(Criteria
required for
the collateral)
£10m Up to 6
months.
Page 302 of 376

Page 303

Annex C
Permitted Investments, Associated Controls, Credit Rating, Money and Time Limits 
Type of Investment Treasury Management Risks Mitigating Controls Credit Rating
Money
Limits
Time   
Limits
m. Investment properties These are non-service properties
which are being held pending
disposal or for a longer-term rental
income stream. These are highly
illiquid assets with high risk to value
(the potential for property prices to
fall or for rental voids). Funding for
this type of investment must be met
from revenue & balances as
borrowing to on-lend for this purpose
is prohibited per Scottish
Government Investment guidance. 
In larger investment portfolios
some small allocation of property-
based investment may
counterbalance or compliment
the wider cash portfolio. Property
holding will be re-valued regularly
and reported annually with gross
and net rental streams.
Strategy/Policy driven subject to
scrutiny by Chief Officer
(Finance).
n/a Policy
Driven 
Policy
Driven, 
n. Loans to third parties
including soft loans
These are service investments either
at market rates of interest or below
market rates (soft loans). These
types of investments may exhibit
credit risk and are likely to be highly
illiquid. Funding for this type of
investment must be met from
revenue & balances as borrowing to
on-lend for this purpose is prohibited
per Scottish Government Investment
guidance.
Prior to awarding loans to a third
party the Service Strategy/Policy
decision to award this type of
loan/loans must be subject to
scrutiny and approval by the
Chief Officer (Finance). Full detail
of the service rationale behind
awarding the loan and the
likelihood of partial or full default
must be assessed.  
n/a Policy
Driven 
Policy
Driven, 
o. Loans to a local authority
company
These are service investments either
at market rates of interest or below
market rates (soft loans). These
types of investments may exhibit
credit risk and are likely to be highly
illiquid. Funding for this type of
investment must be met from
revenue & balances as borrowing to
on-lend for this purpose is prohibited
per Scottish Government Investment
guidance.
Prior to awarding loans to a local
authority company, the Service
Strategy/Policy decision to award
this type of loan/loans must be
subject to scrutiny and approval
by the Chief Officer (Finance).
Full detail of the service rationale
behind awarding the loan and the
likelihood of partial or full default
must be assessed.
n/a Policy
Driven 
Policy
Driven, 
Page 303 of 376

Page 304

Annex C
Permitted Investments, Associated Controls, Credit Rating, Money and Time Limits 
Type of Investment Treasury Management Risks Mitigating Controls Credit Rating
Money
Limits
Time   
Limits
p. Shareholdings in a local
authority company
These are service investments which
may exhibit market risk and are likely
to be highly illiquid. Funding for this
type of investment must be met from
revenue & balances as borrowing to
on-lend for this purpose is prohibited
per Scottish Government Investment
guidance.
Each equity investment in a local
authority company requires
member approval and each
application will be supported by
the service rationale behind the
investment and the likelihood of
loss. 
Service Strategy/Policy driven
subject to scrutiny by Chief
Officer (Finance). 
n/a Policy
Driven 
Policy
Driven 
q. Non-local authority
shareholdings
These are non-service investments
which may exhibit market risk, be
only considered for longer term
investments and will be likely to be
liquid. Funding for this type of
investment must be met from
revenue & balances as borrowing to
on-lend for this purpose is prohibited
per Scottish Government Investment
guidance.
Any non-service equity
investment will require separate
Member approval, and each
application will be supported by
the service rationale behind the
investment and the likelihood of
loss.
Service Strategy/Policy driven
subject to scrutiny by Chief
Officer (Finance) 
n/a Policy
Driven 
Policy
Driven 
Page 304 of 376

Page 305

Annex C
Permitted Investments, Associated Controls, Credit Rating, Money and Time Limits 
Type of Investment Treasury Management Risks Mitigating Controls Credit Rating
Money
Limits
Time   
Limits
r. Subordinated debt in
projects delivered via
‘Hubco/DBFM’ model
The ‘Hubco/DBFM’ delivery model
fails to meet its’ contractual
obligations resulting in failure to
repay the principal sum invested.
The cash forming part of the
Council’s reserves and balances is
required during the term of the
investment as the type of investment
is highly illiquid.
Fluctuations in the levels of interest
rates create an unexpected or
unbudgeted burden on the Council’s
finances against which the Council
has failed to protect itself adequately.
The Council must assess the
merits of each individual
subordinated debt investment
opportunity via the ‘Hubco/DBFM’
model prior to investing, carrying
out a full risk/benefit analysis. 
Employ efficient cashflow
management and forecasting
tools including annual balance
sheet analysis. 
Set a cap on the level of long-
term investments of this nature
i.e. to avoid cash reserves being
fully extinguished resulting in
future non-compliance with
‘borrowing to on lend’ restrictions.
Implement Long term Financial
Plans which are robust including
the setting of contingencies and
cash backed reserves at levels to
leave prudent headroom to cater
for long term cash commitments.
Where possible consider selling
subordinated debt to a secondary
market provider.
For investments in subordinated
debt for projects delivered via the
‘Hubco’ model the rate of return
is fixed over the term of the
investment and in normal
circumstances will not vary.
n/a £1.5m
per
project
Up to 30
years
Page 305 of 376

Page 306

Annex D
Interest Rate Forecast March 2025 until December 2027 (Source: Arlingclose Ltd December 2024) 
*Official Bank rate: (also called the Bank of England base rate or BOEBR) is the interest rate that the Bank of England charges Banks for secured
overnight lending. 
**MM:  the short term readily available from banks and building societies and similar financial organisations 
***PWLB: Public Works Loan Board 
Central Forecast March June Sept Dec March June Sept Dec March June Sept Dec
Official Bank  Rate* 4.50% 4.25% 3.75% 3.75% 3.75% 3.75% 3.75% 3.75% 3.75% 3.75% 3.75% 3.75%
3-mth MM Rate** 4.60% 4.35% 4.10% 3.90% 3.85% 3.85% 3.85% 3.85% 3.85% 3.85% 3.85% 3.85%
1-yr LIBID
5-yr PWLB*** 5.10% 5.00% 4.90% 4.80% 4.70% 4.70% 4.75% 4.80% 4.85% 4.85% 4.85% 4.85%
10-yr PWLB 5.35% 5.25% 5.10% 5.00% 5.00% 5.00% 5.00% 5.05% 5.05% 5.05% 5.05% 5.05%
20-yr PWLB 5.80% 5.70% 5.60% 5.50% 5.45% 5.45% 5.45% 5.45% 5.45% 5.45% 5.45% 5.45%
50-yr PWLB 5.50% 5.40% 5.30% 5.20% 5.15% 5.15% 5.15% 5.15% 5.15% 5.15% 5.15% 5.15%
2025 2026 2027
Page 306 of 376

Page 307

Annex E 
SENSITIVITY ANALYSIS OF PRUDENTIAL INDICATORS: AFFORDABILITY 2025/26 to 2029/30 
The Tables below highlights the impact of
(i) a plus or minus 10% change in the capital financing requirement i.e the level of borrowing undertaken to retain average investment
balances and under borrowing at prudent levels
Prudential Indicators : Affordability CFR
Movement 25/26 26/27 27/28 28/29 29/30
£m £m £m £m £m
Total Composite Capital Financing Costs +10% 62.19 69.84 78.37 85.63 93.59
No Change 61.92 68.84 76.75 83.46 90.74
-10% 61.64 67.83 75.11 81.27 87.88
Total HRA Capital Financing Costs +10% 43.85 51.13 63.65 75.26 84.90
No Change 43.64 50.21 61.56 72.15 80.93
-10% 43.42 49.28 59.48 69.05 76.96
General Fund : Ratio of financing costs to net revenue stream +10% 5.82% 6.53% 7.33% 8.01% 8.76%
No Change 5.79% 6.44% 7.18% 7.81% 8.49%
-10% 5.77% 6.35% 7.03% 7.60% 8.22%
HRA : Ratio of financing costs to net revenue stream +10% 25.52% 29.17% 33.75% 37.32% 40.59%
No Change 25.39% 28.64% 32.65% 35.78% 38.69%
-10% 25.27% 28.11% 31.54% 34.24% 36.80%
Page 307 of 376

Page 308

Annex E 
SENSITIVITY ANALYSIS OF PRUDENTIAL INDICATORS: AFFORDABILITY 2025/26 to 2029/30 
(ii) a plus or minus 50bps change in the interest rates achievable for new long-term borrowing i.e. 1/2 per cent movement
Prudential Indicators : Affordability Interest Rate
Movement 25/26 26/27 27/28 28/29 29/30
£m £m £m £m £m
Total Composite Capital Financing Costs +50bps 62.46 70.48 79.11 86.41 94.23
No Change 61.92 68.84 76.75 83.46 90.74
-50bps 61.37 67.20 74.38 80.51 87.27
Total HRA Capital Financing Costs +50bps 44.07 51.52 63.66 74.94 84.28
No Change 43.64 50.21 61.56 72.15 80.93
-50bps 43.21 48.89 59.47 69.37 77.60
General Fund : Ratio of financing costs to net revenue stream +50bps 5.84% 6.59% 7.40% 8.08% 8.82%
No Change 5.79% 6.44% 7.18% 7.81% 8.49%
-50bps 5.74% 6.29% 6.96% 7.53% 8.16%
HRA : Ratio of financing costs to net revenue stream +50bps 25.64% 29.39% 33.76% 37.17% 40.29%
No Change 25.39% 28.64% 32.65% 35.78% 38.69%
-50bps 25.14% 27.89% 31.54% 34.40% 37.10%
Page 308 of 376

Page 309

Annex E 
SENSITIVITY ANALYSIS OF PRUDENTIAL INDICATORS: AFFORDABILITY 2025/26 to 2029/30 
(iii)
Prudential Indicators : Affordability Movement in
Net Revenue
Steam 25/26 26/27 27/28 28/29 29/30
General Fund : Ratio of financing costs to net revenue stream +10% 5.27% 5.85% 6.53% 7.10% 7.72%
No Change 5.79% 6.44% 7.18% 7.81% 8.49%
-10% 6.44% 7.16% 7.98% 8.68% 9.43%
HRA : Ratio of financing costs to net revenue stream +10% 23.08% 26.03% 29.68% 32.53% 35.17%
No Change 25.39% 28.64% 32.65% 35.78% 38.69%
-10% 28.21% 31.82% 36.27% 39.76% 42.99%
a plus or minus 10% change in the net revenue stream used to calculate the proportion of financing costs to net revenue stream
Page 309 of 376

Page 310

Annex F
LOANS FUND REPAYMENT SCHEDULE   
Loans Fund Repayments Schedules
Composite
Estimated
Loans Fund
Pool Open
Balance
HRA
Estimated
Loans Fund
Pool Open
Balance Total
£m £m £m
Estimated Loans Fund Pool Open Balance 715.7 568.6 1,284.2
Estimated New Advances 25/26 84.2 85.4 169.6
Estimated New Advances 26/27 109.9 183.2 293.1
Estimated New Advances 27/28 91.5 152.4 243.9
Estimated New Advances 28/29 102.7 120.5 223.2
Estimated New Advances 29/30 91.7 142.3 234.0
Total Debt Repayments Due 1,195.7 1,252.4 2,448.0
Scheduled Debt Amortisation Composite HRA Total
£m £m £m
Within 1 year (12.2) (14.2) (26.4)
Within 2 to 5 years (64.1) (75.4) (139.5)
within 5  to 10 years (115.2) (139.9) (255.1)
within 10 to 15 years (146.4) (174.8) (321.2)
within 15 to 20 years (177.2) (178.6) (355.8)
within 20 to 25 years (190.7) (193.6) (384.4)
within 25 to 30 years (165.7) (207.8) (373.5)
within 30 to 35 years (158.8) (171.0) (329.7)
within 35 to 40 years (117.0) (70.3) (187.4)
within 40 to 45 years (48.2) (26.7) (75.0)
within 45 to 50 years 0.0 0.0 0.0
within 50 to 55 years 0.0 0.0 0.0
within 55 to 60 years 0.0 0.0 0.0
(1,195.7) (1,252.4) (2,448.0)
Page 310 of 376

Page 311

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    JMcK/BF Date 26/02/25 
Procurement Strategy 2025/26 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail McKinstryJ@northlan.gov.uk Telephone 07939 281 102 
Executive Summary
To comply with the main procurement legislation ‘The Procurement Reform (Scotland) Act
2014’, requires that the council prepares and publishes a Procurement Strategy on an
annual basis; this may either be new or a refinement to previous strategy. 
This paper provides a copy of the proposed “Procurement Strategy 2025/26” to cover the
period 1 April 2025 to 31 March 2026. The proposed strategy offers some refinement to
Procurement Strategy 2024/25 which was approved by this Committee 12 months ago. 
The notable refinements to the proposed strategy are:
• revised objectives in Procurement Strategy 2025/26 (section 5.1);
• the inclusion and consideration of the council’s PCIP 2024 Assessment (section 8.5);
• incorporation of the council’s Community Wealth Building Statement (section 9.4);
• additions to the policy approach with new considerations for those affected by our
Procurements, including the addition of a trauma informed approach (section 9.5); and,
• refinement of the section on ‘How to do business with the council’ (section 10). 
We are required by legislation to publish the revised procurement strategy online in an
accessible format and to share a copy with Scottish Ministers. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Approve the content of this report;
(2) Endorse publication of the Procurement Strategy 2025/26; and
(3) Acknowledge the requirement to share a copy of the revised procurement strategy
with Scottish Ministers.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 21
Page 311 of 376

Page 312

1. Background 
1.1. As legislated through the Procurement Reform (Scotland) Act 2014 (the “Act”), the
council must have a procurement strategy published, and this should be published
online in an accessible format. The procurement strategy should be refreshed
annually if required, with an update strategy published online and shared with
Scottish Ministers. 
1.2. The Act specifies content to be set out within the procurement strategy, including:
how it links and delivers against local and national priorities; how the council shall
undertake its regulated procurement and in doing so satisfy general and specific
duties; and it requires the council to make a statement on its general policies and
approach to matters where procurement can influence or support. 
1.3. The Act requires monitoring and reporting on the performance of the procurement
strategy, and it prescribes that this should be done through publication of an Annual
Procurement Report. 
1.4. The Act requires the council to ensure that its regulated procurements are carried
out in accordance with legislation and our procurement strategy. 
2. Report 
2.1. We are currently operating with Procurement Strategy 2024/25 as approved by
Finance and Resources Committee 28 February 2024. 
2.2. There are no main departures of approach for the updated procurement strategy.
Consultation was undertaken with members of the Corporate Procurement Working
Group. The featured revisions made in Procurement Strategy 2025/26 are: 
• revised objectives in Procurement Strategy 2025/26 (section 5.1);
• the inclusion and consideration of the council’s PCIP 2024 Assessment (section
8.5);
• incorporation of the council’s Community Wealth Building Statement (section
9.4);
• additions to the policy approach with new considerations for those affected by
our Procurements, including the addition of a trauma informed approach
(section 9.5); and,
• refinement of the section on ‘How to do business with the council’ (section 10). 
2.3. The full Procurement Strategy 2025/26 is included at Appendix 1 of this report
covers the period 1 April 2025 to 31 March 2026. 
3. Measures of success 
3.1.  Procurement Strategy 2025/26 fully complies with the legislative requirements of the
Procurement Reform (Scotland) Act 2014. 
4. Supporting documentation 
Appendix 1 – Procurement Strategy 2025/26 
Page 312 of 376

Page 313

James McKinstry
Chief Officer (Assets and Procurement) 
Page 313 of 376

Page 314

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Procurement Strategy 2025/26 sets an overarching approach for undertaking
regulated procurements; from this we have embedded considerations into the
regulated procurement toolkit and procedures to help procuring services areas
comply with national policies on:
• Equality Duty - https://www.gov.scot/policies/public-sector-
procurement/procurement-equality-duties/; and
• Fair Work First - https://www.gov.scot/publications/publication-of-updated-fair-
work-first-in-procurement-guidance/ 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☒
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
The Procurement Strategy 2025/26 sets an overarching approach for undertaking
regulated procurements; each individual procurement undertaken will have its own
review of Financial Impacts. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☒ No ☐ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Procurement Strategy 2025/26 sets an overarching approach for undertaking
regulated procurements and sets out the governance for procurement activity that
need to be considered in each individual procurement.
Page 314 of 376

Page 315

5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Procurement Strategy 2025/26 sets an overarching approach for undertaking
regulated procurements; from this we have embedded considerations into the
regulated procurement toolkit and procedures to help procuring services areas
comply with national policies on:
• Sustainable Procurement Duty per the requirements of the Procurement
Reform (Scotland) Act 2014;
• guidance on climate change and circular economy
https://www.gov.scot/publications/public-procurement-taking-account-of-
climate-and-circular-economy-considerations-3-2022/; and 
• the Council’s Climate Plan ACT 2030 https://www.northlanarkshire.gov.uk/your-
council/council-strategies-and-plans/council-strategies/climate-plan-act2030 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The Procurement Reform (Scotland) Act 2014 requires monitoring and reporting on
the performance of the procurement strategy, and it prescribes that this should be
done through publication of an Annual Procurement Report. The Procurement
Strategy 2025/25 must also be published online, accessible by the public. 
Page 315 of 376

Page 316

5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
The risks associated to governance of the council’s procurement strategy and
procedures are managed at a corporate level. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☒ 
Page 316 of 376

Page 317

APPENDIX 1 – Procurement Strategy 2025/26 
1. INTRODUCTION
1.1 North Lanarkshire Council (“the council”) is a unitary authority, the fourth largest in
Scotland, and is responsible for the delivery of a wide and diverse range of statutory
and discretionary public services. 
1.2 The council deliver services through a mixed economy acting as both:
• a provider through direct provision of services using its own workforce and
assets; and,
• an enabler with services delivered under commercial arrangements by private
Contractors, the Third Sector and Supported Businesses. 
1.3 During the financial year 2023/24 the council spent £635 Million excluding VAT on
goods, services and works to conduct our operations and delivery of public services. 
1.4 In Scotland, public bodies with an annual procurement spend of £5 million or more
are required by legislation to prepare and publish a procurement strategy or revise
an existing strategy under Procurement Reform (Scotland) Act 2014 (“the Act”). 
1.5 The council has prepared and published Procurement Strategies since 2017 in
conformance with the requirements of the Act; the most recent publication was
Procurement Strategy 2024/25. 
1.6 This document outlines the continuation of the existing procurement strategy with
some refinements to produce our new “Procurement Strategy 2025/26” which shall
cover the period 1 April 2025 to 31 March 2026. 
1.7 The Act requires a public body which is obliged to prepare or revise a procurement
strategy:
• to ensure that its regulated procurements in that year are, so far as reasonably
practicable, carried out in accordance with its procurement strategy; and,
• to publish an Annual Procurement Report as soon as reasonably practicable
after the end of that financial year, but no later than six months after, with
specific means to report its performance against the procurement strategy
amongst other requirements. 
2. PRIORITIES AND THE ROLE OF PROCUREMENT
2.1 Local Priorities
2.1.1 In North Lanarkshire, we are making progress to transform and regenerate towns;
develop high-quality, sustainable housing; create bold, dynamic, flexible places to
learn and work; and create an enviable infrastructure and suitable conditions that
drives investment, growth and prosperity. 
2.1.2 We recognise there are some challenges to overcome, such as high levels
deprivation, child poverty and inequalities in our community. 
2.1.3 The Plan for North Lanarkshire (“the Plan”) sets out our shared ambition for
inclusive growth and prosperity for all, with a fairer distribution of wealth across all
local communities. 
2.1.4 Our vision is for North Lanarkshire to be the place to: Live; Learn; Work; Invest; and
Visit.
Page 317 of 376

Page 318

2.1.5 The Plan sets out five priorities, providing focus for activities and resources.
• Improve economic opportunities and outcomes.
• Support all children and young people to realise their full potential.
• Improve the health and wellbeing of our communities.
• Enhance participation, capacity and empowerment across our communities.
• Improve North Lanarkshire’s resource base. 
2.1.6 We have twenty-five high level ambition statements that collectively support the
shared ambition, and these are aligned to our five priorities. 
2.1.7 A five year Programme of Work (for period 2023-2028) was put in place, setting
seven workstreams to support of The Plan. Each of the workstreams have project
boards headed by our most senior leaders to keep activities aligned and on track. 
2.1.8 An example of programmes of work in progress under the Plan are the “Town and
Community Hub” and “Capital” programmes. These programmes involve multiple
projects, each have requirements for procurement, and each are being conducted in
alignment with this Procurement Strategy and in conformance with the specific
Procurement Toolkit and Procedures covered at section 7 herein this document,
such as requirements of 7.4 Contract Strategy and 7.7 Contract Award. 
2.1.9 The council’s procurement function is seen as an enabler to all aspects of The Plan
as we ensure each regulated and significant procurement undertaken corresponds
to one of the priorities, an ambition statement, and to a workstream; these become
embedded within contract strategies, specifications and form part of tender
evaluation. 
2.1.10 The outputs and achievements of a completed procurement are reported with
reference to a priority, ambition and workstream, and the recorded results will
demonstrate how the procurement has achieved value for money, and delivered
economic, social and environmental benefits. 
2.2 National Priorities
2.2.1 The national priorities, captured more fully in the National Outcomes, has the
objectives to create a more successful country, with opportunities for all of Scotland
to flourish, through increased wellbeing, and sustainable and inclusive economic
growth. 
2.2.2 Recognition for public sector procurement is given as it is seen as "...vitally
important to public services, businesses and communities alike. If we are to deliver
sustainable economic growth, it is essential that we continue to use the power of
public spending to deliver greater public value, drive efficiencies and help public
bodies achieve their overarching purpose and strategic objectives. Smart use of
procurement can play a key role in building a more prosperous and fairer Scotland
by: promoting jobs and growth; encouraging innovation; boosting training,
apprenticeship and employment opportunities; and helping businesses, particularly
small and medium sized enterprises (SMEs), third sector bodies, and supported
businesses to compete effectively for contracts.". 
2.2.3 The first procurement strategy for Scotland, Public Procurement Strategy for
Scotland 2023 to 2028, was published by the Scottish Government in April 2023 and
seeks all public bodies to align with it. 
Page 318 of 376

Page 319

2.2.4 The procurement strategy for Scotland confirms the need for public bodies to have
regard to the National Performance Framework, compliance with legislative
procurement duties, and utilisation of the national procurement policies and
guidance to underpin good procurement practice. These are the steps needed to
achieve the national outcomes through procurement. 
3. GOVERNANCE FOR PROCUREMENT ACTIVITY
3.1 Regulations
3.1.1 The regulations applicable to our procurement activity derived from European Union
Directives, and were transposed into Scots law as follows:
• the Public Contracts (Scotland) Regulations 2015;
• the Utilities Contracts (Scotland) Regulations 2016; and
• the Concessions Contracts (Scotland) Regulations 2016. 
3.1.2 These regulations ensure that public purchases are made in a transparent and fair
manner, seeking to achieve efficiency in public spending while facilitating the
participation of SMEs, third sector bodies and supported businesses. 
3.2 Legislation
3.2.1 The Procurement Reform (Scotland) Act 2014 works alongside the regulations and
is the legislation that governs how Scottish public bodies buy their goods, services
and works, providing a national legislative framework for sustainable public
procurement that supports Scotland’s economic growth through improved
procurement practice. 
3.2.2 The Act focuses on a number of general duties on contracting authorities regarding
their procurement activities and some specific duties aimed at promoting good,
transparent and consistent practice in procurement processes. 
3.2.3 Further provisions under the Act are made through the Procurement (Scotland)
Regulations 2016. 
3.3 General Contract Standing Orders
3.3.1 The Local Government (Scotland) Act 1973 section 81 requires local authorities to
“…make standing orders with respect to the making by them or on their behalf of
contracts for the supply of goods or materials or for the execution of works”. 
3.3.2 Our General Contract Standing Orders (“GCSOs”) set out the council’s specific
procurement procedures and responsibilities at all spend levels, covering both
regulated and non-regulated approaches. GCSOs include our reporting
requirements of procurement activity, including authorisation of contracts awards. 
4. REQUIREMENTS OF THE PROCUREMENT STRATEGY SET BY THE ACT
4.1 In accordance with section 15 of the Act, the procurement strategy must detail how
the council intends to carry out its regulated procurements and in particular:
(a) set out how the council intends to ensure that its regulated procurements will:
(i) contribute to the carrying out of its functions and the achievement of its
purposes;
(ii) deliver Value for Money; and
(iii) be carried out in compliance with the general duties reference in section
8 of the Act to; treat Economic Operators equally and without
discrimination, act in a transparent and proportionate manner, and to
comply with the Sustainable Procurement Duty.
Page 319 of 376

Page 320

(b) include a statement of the council’s general policy on:
(i) the use of community benefit requirements;
(ii) consulting and engaging with those affected by its procurements;
(iii) the payment of a living wage to persons involved in producing, providing
or constructing the subject matter of regulated procurements;
(iv) promoting compliance by contractors and sub-contractors with the
Health and Safety at Work etc. Act 1974 (c.37) and any provision made
under that Act; and
(v) the procurement of fairly and ethically traded goods and services. 
(c) include a statement of the council's general policy on how it intends its approach
to regulated procurements involving the provision of food to:
(i) improve the health, wellbeing and education of communities in the
authority's area; and
(ii) promote the highest standards of animal welfare. 
(d) set out how the authority intends to ensure that, so far as reasonably
practicable, the following payments are made no later than 30 days after the
invoice (or similar claim) relating to the payment is presented - 
(i) payments due by the authority to a contractor
(ii) payments due by a contractor to a sub-contractor
(iii) payments due by a sub-contractor to a sub-contractor 
4.2 The council must have regard to further orders and/or guidance issued by Scottish
Ministers. 
5. PROCUREMENT STRATEGY 2025/26
5.1 Procurement Strategy Objectives
5.1.1 This procurement strategy should:
• support delivery of the local and national priorities;
• confirm that our procurement toolkit and procedures, which are complemented
by national tools and guidance, aim to deliver best value while giving
assurance of regulatory and legislative compliance in our procurement activity;
• showcase our effective procurement function, that has excellent buy-in from
leadership, with a talented network of procurement officers who we support
with training and continuous professional development;
• give assurance that we use our monitoring, reporting and analysis, to then
apply any learning into improving our procurement practice;
• outline our commitment, where applicable, to work with and involve those
affected by our procurements;
• assure that through our robust contract award procedures, we will appoint the
best Contractors who share our vision and want to collaborate with us to help
us achieve our priorities and ambitions; and,
• demonstrate that we are transparent and fair in our procurement approach,
wanting to attract interest and greater participation from businesses of all
types and size, with purpose of generating stronger competition and getting
the best possible outcomes for our regulated procurement opportunities. 
5.2 Alignment with National Procurement Strategy
5.2.1 The revision to this procurement strategy ensures the council are aligned to the
aforementioned public procurement strategy for Scotland, which identified four
enablers:
Page 320 of 376

Page 321

1) Procurement Capability – focussing on the people in the procurement, their
development and involvement as leaders
2) Supplier Development – focussing on the supply chains and their development
to match public sector requirements
3) Engagement – focussing on the processes and tools in procurement, trying to
achieve consistency for both buyer and supplier
4) Collaboration – focussing on strengthening the relationships and work towards
shared goals 
5.2.2 The council recognise the enablers mentioned and these are incorporated within our
procurement approach detailed in this procurement strategy. 
6. THE COUNCIL’S PROCUREMENT FUNCTION
6.1 Importance
6.1.1 The council are responsible for a broad range of statutory and vital public services,
requiring each responsible Service Area to seek tailored procurement advice and
support to help them achieve their service and/or programme of work objectives,
often against a hard economic and unpredictable commercial landscape. 
6.1.2 Having an effective procurement function, directed by a procurement strategy, is
deemed essential to the council, with our procurement professionals on hand to give
advice to our leaders supporting their most strategic decisions, by challenging the
thinking, by developing options, and pursuing innovative and outside-the-box
solutions to overcome challenges and barriers. 
6.1.3 Procurement activity features in the council’s top 25 areas of corporate risk, and as
such, there is a high-level awareness of procurement across the council’s corporate
management team with a need for mitigation measures. 
6.1.4 The main mitigation of procurement risk lies within having controls implemented
across the procurement function, including people and process. Procurement must
be carried out in compliance with the governance of procurement activity outlined at
section 3 herein, making it important to have an approved procurement toolkit
underpinned with guidance, policy and procedures, and an effective group of
procurement professionals able to conduct procurements. 
6.1.5 Public sector has encountered many challenges in recent years with Brexit, COVID-
19 pandemic, and conflicts in various regions of the world. Each of these have
contributed to destabilising the economy, impacting the reliability and availability of
various supply chains, and presenting risks to optimum delivery of public services
and at an affordable price. 
6.1.6 During the pandemic, the procurement function was a vital source of expertise to
help source critical goods and services necessary to enable the first responders and
front-line services to carry out essential services. 
6.1.7 Forward looking, the council’s procurement function is expected to be an enabler for
delivery of the Plan, and in particular a key support in the council being “Net Zero”
by 2030 as per the council’s Climate Plan ACT 2030. 
6.1.8 Our procurement professionals are counted on to be the council’s trusted
ambassadors, representing the council through external networking, building and
developing collaborative relationships with our peers in other public bodies.
Page 321 of 376

Page 322

6.1.9 Our procurement professionals are also vitally important as the interface with
external marketplace, handling enquiries and then leading or supporting events and
initiatives that can attract new interest and lead to development of Contractors and
improved competition. 
6.2 Leadership
6.2.1 The procurement function has a prominent place in the hierarchy of the council’s
leadership model, whereby overall governance and strategic procurement
responsibility belongs to the Chief Officer (Assets and Procurement). The Chief
Officer has a direct channel of engagement with the council’s: Chief Executive;
Councillors; Corporate Procurement Working Group (“CPWG”); and Procurement
and Support Manager who in turn manages the Corporate Procurement Team
(“CPT”). 
6.2.2 Throughout the year, the Chief Executive, Chief Officer (Assets and Procurement)
and Procurement and Support Manager have engagement and participation with
strategic procurement leaders across the ‘procurement network’ including
government, national bodies, local authority peers, collaborative partners and other
professional agencies. Relative and comparable relationships exist and are
encouraged at all levels up and down the council’s procurement function as we
embrace procurement opportunities to be gained through collaboration, networking,
and partnership. 
6.3 Devolved Procurement Model
6.3.1 The council operate a devolved procurement function, including:
• a small CPT comprising category managers and procuring officers, with the
predominant remit of leading or supporting strategic and regulated
procurements, and also management and maintenance of the council’s
procurement registers and procurement toolkit; and,
• an extension of officers across the Service Areas with various levels of
procurement expertise, predominantly undertaking tactical and/or non-
regulated procurement, and often with contract management responsibilities. 
6.3.2 All procurement is undertaken in compliance with the governance of procurement
activity, has regard to the priorities and can be linked to a category management
approach. 
6.4 Category Management
6.4.1 The council has a category management approach, which allows a commercially
focused overview of the aggregate council expenditure, with tiered segmentation
into common categories of spend, broken down further into commodity groups and
down again into specific individual contract requirements. 
6.4.2 CPT consolidates and uploads the council’s spend data recorded on a quarterly
basis to a national online spend platform, which churns and tags our data into
various helpful spend classifications and groupings, readying it for detailed analysis
and further segmentation. 
6.4.3 Segmenting our spend into high level categories provides intelligence, particularly
as we drill down the category into commodity groupings, showing us patterns of our
wider procurement needs, and the range of known Contractors used in each.
Furthermore, the category view helps to inform strategic procurement, identifying
Page 322 of 376

Page 323

opportunities to take advantage of consolidating requirements while streamlining the
number of procurements and improving efficiency. 
6.4.4 All categories work to common principles and rules. Under our category
management approach, the council’s tools and techniques are complemented
further with the online sustainable procurement tools bringing methods for
prioritisation, life cycle mapping and sustainability tests that help establish common
needs and possibilities, particularly on the sustainable procurement measures that
should feature in most procurements aligned to the category. Whatever is identified
at category level can then be transferred into the contract strategy for each
individual procurement, helping the procuring officer and service lead work together
to facilitate quicker decisions and adjustments in procurement approach. 
6.4.5 A key output from the category management approach is the production of Category
Strategies; these will consolidate the analysis, assessments and recommendations
for progressing individual procurements. The Category Strategy will set a high-level
governance and guidance, helping the procuring officers leading individual
procurements to adopt already developed measures including but not limited to:
sustainable procurement duty; equality duty; supported business involvement; and
reducing the impact resultant contracts may have on climate change. 
6.5 CPWG
6.5.1 The CPWG comprises a small number of Chief Officers and representatives with
interest and skills to review, provide oversight, and assist in strategic decisions on
matters pertaining to the council’s procurement function. The CPWG aim to meet
quarterly and provide helpful influence securing council-wide buy-in and promoting
the procurement strategy and procedures. 
6.6 Network of Procuring Officers
6.6.1 The council’s internal procurement network is a forum for procuring officers across
the council, with devolved procurement responsibilities or associated procurement
roles (contract managers, evaluation managers, service experts), to collaborate on
procurement practice. 
6.6.2 We use internal communication channels to provide access to procurement toolkits,
template documents and share communications (guidance notes, policy updates
etc.). These channels function as a repository for sharing examples of best practice
and lessons learned. 
6.6.3 The procurement network promotes opportunities for mentoring and job shadowing
as a mean of developing officers and allowing skills transfer. It is a future priority to
develop this network further to advance specific procurement practice, deliver
essential and bespoke training suited to the individual officer and their service
procurement requirements. Like the national procurement strategy, we also
recognise our people as enablers of effective procurement. 
6.7 Procurement Training
6.7.1 It is necessary that we have a checklist, indicating the awareness and training
needs required for procuring officers and supporting roles (service leads, contract
managers or contract administrators, evaluation managers and evaluators), and this
features in the current procurement improvement programme. 
6.7.2 Particularly for procuring officers, we need to ensure officers are aware and trained
on:
Page 323 of 376

Page 324

• the internal procurement toolkit and procedures;
• the governance of procurement;
• sustainable procurement duty;
• the online sustainable procurement tools and; 
• climate literacy. 
6.7.3 The national procurement competency framework is utilised to help staff self-
appraise their existing competencies and identify areas to be worked on and/or
continuous professional development (“CPD”). 
6.7.4 There is a commitment to the development of our procurement network to maintain
and raise standards across the procurement function. 
6.7.5 We encourage professional qualification through the Chartered Institute of
Purchasing and Supply “CIPS” which is the professional body for procurement.
CIPS members can benefit by participating in CIPS run tutorials, webinars and a
range of other CPD opportunities. Learning and experience gained by our officers
who are CIPS members adds value and benefit where the learning can be
integrated and/or adopted within the council’s procurement function and approach. 
6.7.6 We also encourage and have interest in participation with external programmes
and/or groups, such as Procurement People of Tomorrow (PPoT), to improve the
procurement and commercial skills of our officers and future talent. 
7. THE COUNCIL’S PROCUREMENT TOOLKIT AND PROCEDURES FOR 2025/26
7.1 Overview of Procurement Toolkit and Procedures
7.1.1 The council have a comprehensive procurement toolkit and supporting procedures,
maintained by CPT and mandated through the council’s GCSOs. These are
continuously under review and development, and in place to ensure a consistent
approach in particular to regulated procurement activity, ensuring compliance with
the governance of procurement, the associated general and specific duties, and
mitigating procurement related risks. 
7.2 Forward Procurement Plans
7.2.1 The category managers work closely with service areas to consider new and
recurring procurement requirements and from this can establish forward
procurement plans which are essential for resource allocation and planning of
procurement activity. 
7.2.2 The forward procurement plans are consolidated to complete the requirements of
Annual Procurement Report, outlining the expected regulated procurements to be
undertaken in the next two financial years, providing transparency for prospective
Contractors interested in doing business with the council. 
7.3 Contract Strategy
7.3.1 An internal contract strategy is the main pre-tender document from the procurement
toolkit, required to be produced for all regulated and significant procurements. 
7.3.2 The Contract Strategy may derive from an established Category Strategy, through
inheriting any high-level practice and decisions, such as identified sustainable
procurement measures, that should be incorporated into the planned procurement. 
Page 324 of 376

Page 325

7.3.3 The Contract Strategy can also be written bespoke and/or deviate from the
Category Strategy as required to meet particular contract objectives. 
7.3.4 Each Contract Strategy should be tailored to reflect and achieve: the service area
and/or stakeholder needs; the level of competition in the marketplace; and the
choice of procurement procedure and agreement type to ensure optimum
competition with objective to achieve the desired quality outcomes and best value. 
7.3.5 The Contract Strategy will link the procurement to the Priorities helping the
procuring officers focus on setting the desired procurement objectives. 
7.3.6 This internal document has a key purpose in ensuring the preparation for
procurement is made in compliance with the governance of procurement activity.
The format of the contract strategy is structured with checkpoints and
considerations, including but not limited to:
• risk and opportunity assessment;
• consideration for sustainable procurement duties, and for those identified,
what is needed in the tender approach to achieve these targets;
• how we can influence and encourage Contractors to support the Procurement
Priorities, including Fair Work Practice, reduction of waste and carbon
emissions;
• establish relevant targets for Community Benefits for the procurement, such
as job creation, training, and use of sub-contractors;
• make or buy decisions, and consideration of the circular economy;
• decision on procurement route with consideration given to the potential to
reserve opportunities for supported businesses where it is identified they are
able to fulfil the requirements;
• applying measures to reduce inequality and facilitate the involvement of
SMEs, third sector bodies and supported businesses;
• encouraging innovation per guidance in SPPN 3/2023; 
• consider how to involve those who may be affected by the procurement;
• setting the evaluation criteria; and
• capture key decisions. 
7.3.7 Contract Strategies are required to be authorised in accordance with GCSOs before
the associated procurement progresses to competition. 
7.4 Tender Packs
7.4.1 CPT have established tender packs for all types of regulated procurements the
council may undertake, this ensures a consistent approach for procuring officers
and for potential contractors. A key feature of the tender pack is the council’s
standard terms and conditions applicable in all contracts, which incorporates
requirements set by the Act and the mandated clauses from policy guidance SPPN
2/2022  ‘prompt payment in the supply chain’. 
7.4.2 Each tender pack will have a clear ‘conditions of participation’ and outline any
selection and award criteria; this provides transparency and clearly informs those
expressing interest and/or planning to tender the council’s rules and protocols for
tendering, how tenders will be checked and evaluated, and the tender opening
procedures (these are also covered in GCSOs). 
7.4.3 A template quality questionnaire has been created with considerations and a choice
of questions to capture tenderer feedback on key areas of impact that are important
Page 325 of 376

Page 326

to the council, including: fair work first; community benefits and social value; net
zero / carbon reduction; data protection and cyber security amongst others. 
7.5 Tendering
7.5.1 The council’s tendering approach for regulated procurements is generally conducted
through the national platforms:
• Public Contracts Scotland Portal (“PCS”); and 
• PCS-Tender (“PCS-Tender”). 
7.5.2 These platforms ensure consistency for prospective contractors and should
encourage participation, particularly with the national support available through the
Supplier Development Programme (“SDP”) and the Supplier Journey. Furthermore,
each system has its own independent helpdesk with both telephone support and a
catalogue of guides. 
7.5.3 The tender platforms offer transparency, facilitating questions and answers during
the tender process, administering tender deadlines, and operating a sealed-bid
approach where the tender post-box remains locked to ensure any bids received
cannot be opened until the deadline has passed. 
7.5.4 Exceptions to using the above platforms may be for bespoke procurement exercises
or when we are conducting a call-off from a 3rd party framework or dynamic
purchasing system (“DPS”) and its either mandatory or beneficial to use the
framework or DPS providers platform. 
7.6 Tender Evaluation
7.6.1 In each individual procurement, a tender evaluation manager and team of
evaluators are identified when finalising the contract strategy. 
7.6.2 Any officer or individual nominated to undertake a tender evaluation role must first
complete a conflict of interest and confidentiality statement prior to receiving any
bids for evaluation; this ensures professionalism and integrity apply to the evaluation
process. 
7.6.3 The tender evaluation manager is responsible for any clarification requirements and
consolidating evaluation scores and result. 
7.7 Contract Award Reports
7.7.1 Contract award reports are the main post-tender document from the procurement
toolkit, used internally to detail the scoring and finalised results of tender evaluation. 
7.7.2 Contract award reports will summarise the key outcomes in a procurement, from
savings to benefits captured, while also explaining how best value has been
achieved. 
7.7.3 The Chief Officer of the Procuring Service is required to approve contract award
reports, and where applicable, seek Committee approval in accordance with the
procedures set out in GCSOs. 
7.7.4 As soon as the relevant approval(s) are given for the contract award report, the
procurement can proceed to stage of finalising the contract award by formal
communication of the result with the candidates and tenderers. 
7.8 Notices of Decisions
Page 326 of 376

Page 327

7.8.1 The procurement toolkit has letter templates that the procuring officer will use to
explain the procurement outcome following the conclusion of the respective stage of
a procurement, informing candidates or tenderers with the required feedback under
the relevant governance of the procurement. 
7.8.2 Depending on the contract award value and in accordance with the procedures set
out in GCSOs, letters will be issued under the approval of either the Chief Officer
(Assets and Procurement) or the Chief Officer of the procuring service area. 
7.8.3 The procuring officer will close the procurement process with publication of the
relevant contract notice and results fulfilling the relevant governance of the
procurement. 
7.9 Contract Register
7.9.1 The council has a publicly accessible online contract register contained within PCS
which is auto-populated on publication of contract notices, with further monitoring
and maintenance of the register undertaken by CPT. 
7.10 Contract Management
7.10.1 The council is required to have robust contract management arrangements in place,
particularly for its most strategic contracts to ensure the council works effectively
and professionally with the appointed contractors. 
7.10.2 Any key performance indicator and/or services levels must be considered during
development of contract strategy and carried forward into the tender pack. GCSOs
set out minimum requirements for contract monitoring. 
7.10.3 Each contract we enter should be formed on the basis of:
• the council’s tender pack, comprising specification of requirements;
• general conditions of contract (and if applicable special terms also);
• the accepted tenderer proposals, method statements and pricing; and
• any other pertinent detail captured and written into the final contract award
letter. 
7.10.4 It is important that each contract is managed as specified and agreed in the contract
award. 
7.10.5 While best value and other desirable outcomes may have been identified in the
procurement, it is the responsibility and work through contract management that
ensures that the expected outcome are achieved. 
8. MONITORING AND REPORTING
8.1 Annual Procurement Report
8.1.1 The Annual Procurement Report 2025/26 will be produced as soon as possible after
the financial year and used to report the performance and effectiveness of
Procurement Strategy 2025/26. 
8.1.2 The Annual Procurement Report will be produced in conformity to the Act and utilise
the recommended reporting template provided in SPPN 2/2023 aiming to ensure
consistent reporting from all public bodies. The report measures what we have
achieved in our contract awards, including:
• Number of Regulated procurements;
Page 327 of 376

Page 328

• Compliance with Procurement Strategy;
• Community Benefits accrued;
• Appointed Contract status with Fair Work and the Real Living Wage;
• Payment Performance;
• Supported Business; and,
• Total Spend and Savings. 
8.1.3 The data sources for the above information will be payments made through the
council’s financial system, data gathered through the procurement registers
managed by CPT, and the outputs from the national online spend platform (as
mentioned at 6.4.2 herein). 
8.1.4 To finalise the production of the Annual Procurement Report, prior consultation and
approval will be sought from the CPWG members, committee, and the Chief Officer
(Assets and Procurement). This will be published in an accessible format on the
council’s website and shared with Scottish Ministers. 
8.2 Local Government Benchmarking Framework (“LGBF”)
8.2.1 The council contribute to the national reporting metrics and indicators, which
includes a procurement measure attached to the focus area of Economic
Development:
• Proportion of procurement spent on local enterprises. 
8.2.2 Data to produce this metric will be the same sources mentioned at 8.1.3 above. 
8.2.3 This metric will be published in an accessible format on the LGBF website. 
8.3 The Council’s Strategic Performance Framework
8.3.1 The council utilise a platform of performance metrics in all services to keep track
and focus of how each service and team are performing, these are:
• Procurement spend - % through collaborative contracts with other publicly
funded bodies
• Procurement spend - % with contracted suppliers
• Procurement contracts - % qualifying contracts >£1m containing a community
benefit requirement
• Procurement contracts - % qualifying contracts awarded to clients who meet
fair work criteria
• Procurement assessment score - procurement and commercial improvement
programme (PCIP)
• Procurement contracts - % qualifying contracts in reporting period to local
organisations
• Procurement contracts - % qualifying contracts in reporting period to small
medium enterprises
• Procurement spend - % awarded to local organisations 
• Procurement spend - % with small medium enterprises 
8.3.2 Data for the production of these metrics will be gathered from the same sources as
8.1.3 above. 
8.3.3 These metrics will be reported by the Chief Officer (Assets and Procurement) to the
relevant council committee annually and publicly available from the council’s
‘Committee: Meetings, Agendas and Minutes’ system. 
Page 328 of 376

Page 329

8.4 Audits
8.4.1 The council’s Internal Audit department provides independent and objective
assurance to the council's senior management that systems and controls are fit for
purpose. The most recent audits related to Procurement were focussed on:
• Contract and supplier management; and,
• Procurement – Best Value Approach. 
8.4.2 These audits are welcomed to provide critical review and recommendations, adding
focus for procuring officers and sharpening the procurement toolkit and procedures. 
8.4.3 Progress on actions arising from audits are reported to the council’s audit and
scrutiny panel, which ensures continuous management until the actions are
completed. 
8.5 Procurement and Commercial Improvement Programme (“PCIP”)
8.5.1 The council is committed to improving procurement performance and practice of its
overall procurement function, therefore we feel it is essential to participate in the
National PCIP assessments. 
8.5.2 Local Authority PCIP assessments are conducted by Scotland Excel, usually every
two years, but the assessment programme encountered some disruption due to
COVID19 pandemic and recovery period. 
8.5.3 Following each assessment, Scotland Excel provide the council with a formal output
report, outlining what has been identifies as strengths and areas where the council
have scope for improvement. 
8.5.4 The council has undergone three PCIP assessments in 2017, 2019 and 2024. 
8.5.5 The council’s 2024 PCIP assessment report is being used by CPT to set a
“procurement improvement plan” for the procurement function to address across the
period of Procurement Strategy 2024/25 and Procurement Strategy 2025/26. 
9. PROCUREMENT STRATEGY 2024/25 GUIDED BY REQUIREMENTS OF THE
ACT 
9.1 Ensuring Regulated Procurements Contribute To The Carrying Out Of The
Council's Functions And The Achievement Of Council Purposes
9.1.1 All regulated procurements will be conducted using the procurement toolkit and
procedures set out at section 7 herein. For clarity, it is expected a pre-tender
contract strategy will be completed and a post-tender contract award report will be
produced; both documents require the council priority, ambition statement and
programme of work priority to be identified, and both require authorisation to be
finalised per GCSOs. 
9.1.2 With the checkpoints in place in the respective procurement toolkit documents, CPT
can log the impacts of each procurement into our procurement registers allowing us
to produce a compliance report to verify expected outcomes and compliance with
the Act.   
9.2 Ensuring Regulated Procurements Deliver Value For Money
9.2.1 All regulated procurements will be conducted using the procurement toolkit and
procedures set out at section 7 herein. For clarity, it is expected a pre-tender
Page 329 of 376

Page 330

contract strategy will be completed and a post-tender contract award report will be
produced. 
9.2.2 The contract strategy will set out the options appraisal and tender evaluation criteria
chosen with the ultimate aim to deliver value of money; this document will require
approval before the tender pack is produced and the procurement is published. 
9.2.3 The contract award report will outline the evaluation results validating how the
tender of the preferred bidder represents value for money; this document will require
the relevant approval to enable the next stages in contract award process. 
9.2.4 With the checkpoints in place in the respective procurement toolkit documents and
procedures, CPT can log the impacts of each procurement into our procurement
registers allowing us to produce a compliance report to verify expected outcomes
and compliance with the Act.   
9.3 Ensuring Regulated Procurements Are Carried Out In Compliance With The
General Duties To; Treat Economic Operators Equally And Without
Discrimination, Act In A Transparent And Proportionate Manner, And To
Comply With The Sustainable Procurement Duty 
9.3.1 All regulated procurements will be conducted using the procurement toolkit and
procedures set out at section 7 herein. 
9.3.2 The contract strategy provides an appraisal on the procurement route, and will
consider maximising competition, reducing barriers to entry and ensuring complying
with the principles of procurement. 
9.3.3 Considerations on sustainable procurement duty are initially carried out within the
category strategy making appraisals with use of the online sustainable procurement
tools. Those measures identified at category level transfer into the contract strategy
for full use or adaptation to suit the individual contract requirement. 
9.3.4 The contract strategy will require approval before the tender pack is produced and
the procurement is published. 
9.3.5 The notifications of contract awards decisions will provide successful and
unsuccessful candidates and tenderers comprehensive feedback to the extent
provided by the relevant governance of the procurement. 
9.3.6 With the checkpoints in place in the procurement toolkit, CPT can log the impacts of
each procurement into our procurement registers allowing us to produce a
compliance report to verify expected outcomes and compliance with the Act.   
9.4 The Council’s General Policy on the use of community benefit requirements
9.4.1 Whilst a national model for Community Wealth Building is being developed, the
council’s contracts can still help realise a wide range of social, economic and
environmental benefits, including better employment, training and sub-contracting
opportunities. The council has recently approved a Community Wealth Building
Statement, with next steps to implement and monitor progress. 
9.4.2 Community benefits delivered by our contracts have been shown to contribute to
local and national outcomes relating to employability, skills development and local
regeneration. 
Page 330 of 376

Page 331

9.4.3 If there is an opportunity to benefit the community, the council include appropriate
requirements in our contracts in accordance with relevant legislation, statutory
guidance, best practice and GCSOs. 
9.4.4 For any contract awarded in which community benefits are part of the proposal, CPT
will log the expected requirements within the procurement register. Under the
contract management approach, the responsible contract officer will manage the
Contractor to ensure the benefits are delivered. CPT will at least annually contact all
contract officers to gather feedback on community benefits realised, again logging to
the procurement register which will allow comparison between those expected
compared with what has been delivered. 
9.4.5 The council’s overall performance on community benefits will be reported in the
Annual Procurement Report. 
9.5 The Council’s General Policy on consulting and engaging with those affected
by its procurements
9.5.1 The council recognises that it is important to consult and engage with those affected
by our procurements, and where relevant and proportionate, to allow the views of
those affected to be considered. The procurements must accurately reflect need
and opportunity, and take account of the wider context, including the local and
national priorities.
9.5.2 In each individual procurement, the contract strategy development will therefore
prompt consideration of those affected. 
9.5.3 The council engage outward with stakeholders through many formats and channels,
tailored to the procurement and its objective.  Examples include but are not
restricted to: online surveys; public and community consultations; and targeted
engagement with affected stakeholder groups for the specific procurement being
sought. 
9.5.4 The council encourages its procuring officers to undertake pre-tender engagement
with the marketplace, particularly when it has complex requirements and/or when
through analysis it anticipates that the level of competition is low which would then
impact on the competitiveness of the procurement. 
9.5.5 The council will consider a trauma informed approach where is it relevant to do so,
allowing those procurements to integrate the knowledge and experience gained
through lived experience of both adults and children. The process of including lived
experience involves working with people through the tender design, evaluation and
implementation, fully adapting processes, paperwork and systems to promote
diversity, inclusion, support and recognition of trauma. 
9.5.6 In April 2023, the council established the contract “Counselling for Care
Experienced Young People”, where the procurement approach involved a
representative group of care experienced young people to co-produce the service
specification and help design the evaluation parameters. The tender evaluation
process included a lived experience panel to evaluate tender proposals; this was
facilitated in a format that was bespoke to their needs, and this ensured their voice
was heard and their views were part of the contract award decision. Other
procurements of health and social related services have since been undertaken with
effective involvement of people who use the services, and all regulated
procurements for adult health & social care consider best practice principles for
ethical commissioning.
Page 331 of 376

Page 332

9.5.7 The council complies with its duty to respond to requests received under freedom of
information and there is an online Comments, Compliments and Complaints
procedure. 
9.6 The Council’s General Policy on the payment of a living wage to persons
involved in producing, providing or constructing the subject matter of
regulated procurements
9.6.1 The council has made a commitment to Fair Work First and the councils website
details our approach with our own workforce and operations. 
9.6.2 Furthermore, the council are an accredited Living Wage employer; this is a clear
commitment to pay at least the real Living Wage for all staff we directly employ. 
9.6.3 The council encourages the Contractors we work with and want to attract, to pay the
real Living Wage as part of a package of fair work practice. It’s our experience that
those which have a diverse workforce and whose staff are well rewarded, well-
motivated, well led and who have appropriate opportunities for training and skills
development, are likely to deliver a higher quality of service. A positive approach to
fair work practices can have a positive effect on the quality of the services, supplies
and work delivered on our contracts. 
9.6.4 Our tender opportunities seek information on the potential Contractors position on
fair work and Living Wage. 
9.6.5 Where conditions of the national guidance on payment of the real Living Wage can
be legally mandated, we will follow such approach including model tender evaluation
questions available from the online sustainable procurement tools. 
9.6.6 Should the council award a contract to a Contractor who is making commitment to
pay the real Living Wage, this will form part of the contract, and it will be monitored
through the Contract Management arrangements. 
9.6.7 The council will report the number of real Living Wage Contractors appointed in our
Annual Procurement Report. 
9.7 The Council’s General Policy on promoting compliance by contractors and
sub-contractors with the Health and Safety at Work etc. Act 1974 (c.37) and
any provision made under that Act
9.7.1 The Council is committed to ensuring that nothing purchased by us is at the
expense of the health and safety of those who are involved in delivering our
contracts whether directly or as part of the supply chain. 
9.7.2 It is important that those bidding for our contracts are able to demonstrate that they
are responsible Contractors who keep to their legal duties, including duties relating
to health and safety. 
9.7.3 It is a standard condition of our contracts that the contractor must keep to all laws
that apply, the requirements of regulatory organisations, and good industry practice.
This includes any relevant health and safety law. Health and safety criterion forms
part of the evaluation for all relevant contracts. 
Page 332 of 376

Page 333

9.7.4 Whenever Contractors’ staff are on our premises, under the terms of our standard
contracts they must keep to our own health and safety requirements. 
9.7.5 The council will revise our standard contract management arrangements to make
sure that we include information about health and safety incidents relating to
delivering our contracts and any measures we take to put things right. 
9.8 The Council’s General Policy on the procurement of fairly and ethically traded
goods and services
9.8.1 The council takes a robust approach in its procurement processes and work with its
collaborative procurement partners and agencies to tackle criminal activity in line
with the national serious organised crime strategy, and use the SPD and tender
questions to prevent human trafficking and exploitation, modern slavery, corruption
and fraud. It is our objective to promote positive employment practices. 
9.8.2 The regulated procurement procedures we follow involve assessing a potential
Contractors suitability to be awarded the contract. This process includes checking
for exclusion grounds per the regulations and the Act, such as convictions, breaches
of duty, offences or acts of professional misconduct. 
9.8.3 The council’s standard terms and conditions of contract allow the council to end a
contract if the Contractor or sub-Contractor fails to keep to their legal duties in the
areas of environmental, social or employment law when carrying out that contract. 
9.8.4 The council were awarded “Fairtrade Zone Status” in recognition of the support and
awareness the local schools, churches, businesses and communities have given to
Fairtrade products. This a clear commitment to consider the relevant and
proportionate application of fair and ethical principles in our procurement activities. 
9.8.5 The council commits to considering the purchase of fairly traded supplies if available
to meet our requirements through the contract strategy, which includes seeing how
best to integrate with the specification of requirements and evaluation process. 
9.8.6 The APR for this strategy will include a statement about the effectiveness of our
procurement procedures. 
9.9 The Council’s General Policy on regulated procurements involving the
provision of food
9.9.1 The council recognises food and drink as a key industry sector where major
sustainability wins can be achieved. The procurement of food and catering services
is a high-ranking area because there are major social, economic and environmental
impacts. It can have benefits on community health, wellbeing and social justice
through access to good nutrition including fresh and seasonal produce. 
9.9.2 The council’s approach to its contracts involving food, which are under our direct
control, is to make sure that it keeps to all relevant Government policies on healthy
eating and nutrition, promoting fresh and seasonal and local produce, and on fairly
traded produce. These standards take account of a range of factors, including
production, traceability, authenticity, origin, ethical trading, animal welfare,
environmental standards, and health and waste. 
9.9.3 The council continue to consider available Scottish products that we source through
initiatives such as the Red Tractor assurance scheme and through engagement with
Page 333 of 376

Page 334

the Food for Life programme we aim to increase the amount of locally sourced and
produced food for our schools. 
9.9.4 Keeping to the policy commitment is part of our Contract Management
arrangements for all food contracts. 
9.10 The Council’s approach to prompt payment performance in the supply chain
9.10.1 The council support the national policy and agree with the position that prompt
payment is necessary for local and national economic recovery and longer-term
wellbeing. Prompt payment of the supply chain is ethical and socially responsible,
and critical to the sustainability and resilience of our supply chains who in turn are
supporting us with our service delivery and priorities. 
9.10.2 Following SPPN 2/2022, the lead procuring officer will design the selection stage
(SPD) for a regulated procurements with a standard statement as means of
understanding the payment performance history and payments systems of bidders;
this allows an informed contract award decision and ability to reject a candidate that
does not comply with the requirement. 
9.10.3 The council’s standard terms and conditions, as mentioned at 6.8.3.1 herein, uses
the recommended clauses to mandate all aspects of prompt payment in our
contracts. We have also included an escalation process should any Contractor or
Sub-Contractor be in dispute that prompt payment has been complied with. 
9.10.4 Monitoring of compliance with prompt payment is covered within our guidance on
Contract Management and within GCSOs 
10. How to do Business with North Lanarkshire Council
10.1 The council welcomes interest and competition in our contract opportunities from all
businesses. We have an ambitious plan for North Lanarkshire, and we recognise
that innovation and expertise that can be procured from the supply base to help us
meet our objectives. 
10.2 Any potential Contractor who are seeking access to our contract opportunities are
encouraged to be registered on:
• the national advertising platform Public Contracts Scotland Portal (“PCS”);
and,
• the national e-Tendering system “PCS-Tender”.
these online platforms provide automated notifications to Contractors (based on
their business areas they have matched their PCS profile to) providing alerts when
the council advertise open opportunities. These platforms facilitate our competitive
quotations or tenders. 
10.3 The council has a buyer portal which sits within PCS; this is a public resource that
acts as an online directory featuring links to:
• the council's contract register;
• displaying notices for our open contract opportunities; and 
• displaying notices of our previous contract awards. 
10.4 The council’s contract register holds current contract details; this helps any
Contractor determine opportunities, when current contracts expire and when the
council are likely to re-tender. 
Page 334 of 376

Page 335

10.5 The council produce an Annual Procurement Report 2023/24 which has a dedicated
section setting out the expected contract opportunities for suppliers to get involved
in over the next 2 financial years. 
10.6 Further links to the council’s procurement activity and publications can be found on
our website. 
10.7 For construction projects, in progress or coming soon, the council provide additional
updates on our activity through the “Scottish Pipeline Forecast Tool”. This acts as a
further resource that may be of assistance to potential suppliers looking for
subcontract opportunities. 
10.8 The corporate procurement team and procuring officers across the council’s Service
Areas support the Lanarkshire and National “Meet the Buyer” events, which are
generally the key networking days our procuring officers where we have time
dedicated to liaising with potential Contractors. 
10.9 In addition to liaison with the council, the Supplier Development Programme (“SDP”)
offer independent support and training to businesses who are seeking help /
guidance with public sector contracting opportunities. The council work in co-
operation with SDP including making referrals, especially where there is a change in
tender process. 
10.10 For awareness, the council’s contract opportunities for below £50,000
Supplies/Services or below £2,000,000 Works are not subject to the procurement
regulations, and in these cases the procuring Service Area is guided to consider a
procurement route that represents best value. 
10.11 Generally procuring officers undertaking non-regulated procurements will source
their requirements through either:
• Using an already established Framework Agreement i.e. Scotland Excel /
National Frameworks / Crown Commercial Services Frameworks; or
• Undertaking a competitive quotation exercise.
The Council’s full procurement procedures are set out in GCSOs. 
11. Implementation of Procurement Strategy 2025/26
11.1 This procurement strategy will be under constant review to ensure that the council
are flexible in adopting emerging guidance and polices into its procurement function. 
11.2 There will be continued engagement with key stakeholders and access to
appropriate accredited training for relevant staff. 
11.3 Independent audit and assurance will be sought to challenge and test on a sample
basis both the system as a whole and compliance with it, in order to identify (and
correct) any identified weaknesses. 
11.4 The council’s procurement performance against this procurement strategy will
continuously be monitored, with reporting produced after the financial year end, with
output report expected to be approved and published by 30 September 2026. 
Page 335 of 376

Page 336

Glossary 
“Community Benefits” requirements which deliver wider benefits in addition to the core
purpose of a contract. These can relate to social, economic and environmental benefits. 
“Contractor” any organisation that provides Supplies, Works or Services to the Council or
on behalf of the Council. 
“Economic Operators” are defined in The Act, means any person who offers the execution
of works, the supply of products or the provision of services on the market 
“LGBF” is a high-level benchmarking tool designed to support senior management teams
and elected members to ask questions about key council services. 
“Living Wage” an independently calculated rate based on the cost of living and is paid
voluntarily by employers. The rate is calculated each year in November by The Resolution
Foundation on an analysis of the wage that employees need to earn in order to afford the
basket of goods required for a decent standard of living. This basket of goods includes
housing, childcare, transport and heating. The Real Living Wage is different to the UK
government’s National Living Wage which is not calculated according to what employees
need to live on. 
“Procurement” the tasks and decisions which secure an external Contractor to provide what
we want, at a price that we can afford. Activity is focused on the period from prior to
advertising a tender to signing the contract. It includes both competitive tenders and
circumstances where we negotiate with a single Contractor. 
“Regulated Procurements” refers to any Procurement: above £50,000 for Supplies or
Services; and above £2,000,000 for Works. 
“Scotland Excel” is the national centre of expertise for local government procurement;
responsible for working with Scottish councils to improve procurement performance and
practice, and also the lead buying authority for a range of national collaborative procurement
frameworks. 
“Services” are those services that we buy including specialist support for vulnerable
children and adults, and also repairs and maintenance services, financial advice, designs
and surveys for new building works. 
“Single Procurement Document” / “SPD” - standard questionnaire the council use in
regulated procurements that allows us to identify suitably qualified and experienced bidders.
It contains questions on both exclusion and selection criteria. Bidders will use their SPD
response to indicate whether they can meet the requirements of the procurement exercise. 
“SME or Small and Medium Enterprises” defined by the number of employees whereby
micro is 9 or fewer, small is 10-50, medium is 51-250. 
“SPPN” abbreviation of ‘Scottish Procurement Policy Note’, these are the messages from
the Scottish Government’s procurement policy team, providing advice to public bodies on
procurement policy. 
“Supplies” items that we buy, such as pens and paper, or plants and seeds, or fruit and
vegetables. 
Page 336 of 376

Page 337

“Supplier Development Programme” is a public sector organisation who offer expert
training, support and information to businesses develop and compete for Contracts. 
“Supported Business” are social enterprises whose main aim is to integrate disabled or
disadvantaged people socially and professionally. Their workforce must be at least 30%
disabled or disadvantaged. “Supported Business” as defined in the procurement
regulations, means an economic operator whose main aim is the social and professional
integration of disabled or disadvantaged persons and where at least 30% of the employees
of the economic operator are disabled or disadvantaged persons 
“Sustainable Procurement” is a process whereby organisations meet their needs for
Supplies, Services and Works in a way that achieves value for money and generates
benefits, not only for the organisation but also to wider society, the economy and the
environment. 
“Third Sector” is the group name for a range of organisations including community groups,
charities, voluntary organisations, faith groups, social enterprises, community interest
companies. Third sector organisations may be registered charities and may be registered
companies. They include small, local groups and large multinational operations, and
everything in between. 
“Value for Money” – achieving the best balance between cost, quality and sustainability 
“Works” is the construction works that we buy, including construction of new buildings, or
Page 337 of 376

Page 338

Page 338 of 376

Page 339

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    EK/KS Date 26/02/25 
Review of 2024/25 to 2026/27 Budget Savings 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail KempE@northlan.gov.uk Telephone 07939280601 
1. Background 
1.1. At its meeting of 15 February 2024, the Council approved a General Fund Revenue
Budget of £1,016.750m which included spend offset by ring fenced grants of £15.290m. 
Additional funding has since been confirmed as part of the Scottish Government budget
setting resulting in an overall total budget of £1,008.867m. 
1.2. Net savings totalling £28.096m over the financial years 2024/25 to 2026/27 were
agreed within the budgets set on 23 February 2023 and 15 February 2024, with
£21.195m incorporated into the 2024/25 budget and the balance £6.901 over 2025/26
and 2026/27.  In addition, base budget adjustments of £0.682m have also been agreed
Executive Summary
This report provides the Finance and Resources Committee with an update on the
achievement of the three-year financial savings total of £28.778m approved as part of the
2024/25 budget setting process (£21.667m 2024/25, £5.893m 2025/26 and £1.218m
2026/27).   
It is projected that £20.245m of the savings (93%) will be delivered within the financial year,
with replacement savings of £1.422m identified to fully address the shortfall. 
In addition, it is currently anticipated that there will be no recurring savings gap arising
from the 2024/25 to 2026/27 approved savings.   
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the contents of this report.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Item 22
Page 339 of 376

Page 340

over the three-year period, £0.472m of which relates to 2024/25, giving total savings in
year of £21.667m. 
1.3. Services are required to monitor the delivery of their target savings to ensure they
remain within approved budgets and provide periodic progress updates within
individual Service revenue monitoring reports, identifying alternative solutions to any
in-year shortfall envisaged.  In addition, Services are required to monitor whether the
original approved saving has been implemented and if not, provide an explanation
along with alternative action required to ensure the recurring financial saving will be
achieved going forward. 
1.4. This report summarises the progress in achieving approved savings for the three-year
period 2024/25 to 2026/27. 
2. Report 
Update on Approved 2024/25 to 2026/27 Savings 
2.1 A summary of the three-year approved savings is provided at appendix 1 along with
the current forecast of savings achievable for each of the years.   
2.2 It is currently anticipated that £20.245m (93%) of approved 2024/25 savings of
£21.667m will be achieved in the current financial year, leaving an in-year savings gap
of £1.422m.  Replacement savings and funding has been identified to fully address the
shortfall, which includes management action such as control of vacancies, curtailment
of expenditure and the use of Earmarked Reserves.  More information on the savings
unachievable within 2024/25 are detailed at appendix 2, with more information reported
to the relevant service committee. It should be noted that there is no anticipated
recurring budget impact as a result of the in-year savings gap. 
2.3 In relation to future years, net income generation of £0.200m in relation to provision of
external MOTs which was anticipated for 2025/26 is now expected to be achieved
within 2026/27 due to a delay in setup and staffing of the new Bellshill Fleet depot. At
this stage there are no further anticipated delays or shortfall expected in relation to
future year savings, however these will continue to be monitored with updates reported
to Committee as appropriate.       
3. Measures of success 
3.1  The Council continues to operate within approved budgeted resources.   
4. Supporting documentation 
Appendix 1 Approved 3 Year Savings Summary 
Appendix 2 Budget Savings by Exception 2024/25   
Elaine Kemp
Chief Officer (Finance) 
Page 340 of 376

Page 341

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 341 of 376

Page 342

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐  
Page 342 of 376

Page 343

Page 343 of 376

Page 344

Appendix 2
North Lanarkshire Council
Review of Budget Savings by Exception 2024/25
Service Division Saving Detail
Approved
Saving
£m
Projected
Savings
£m
In Year
Savings Gap
£m
Recurring
Gap
£m
E&C Community Operations Charging for Recycling Bins 0.210 0.175 0.035 0.000
E&C Community Operations Income Generation - Fleet Tachograph 0.050 0.000 0.050 0.000
ECF Early Years Review of ELC: Single Status Employee Resources 2.000 0.750 1.250 0.000
ECF Education Services HQ Contracts and Provisions (Under-utilised budgets) 0.045 0.000 0.045 0.000
ECF Community Learning Review of CLD delivery service, including the provision of
youth diversionary activities 0.163 0.121 0.042 0.000
Total Savings 2.468 1.046 1.422 0.000
2024/25
Page 344 of 376

Page 345

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    EK / GT Date 26/02/25 
Local Taxation Debt Write-Off 2024/25 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail KempE@northlan.gov.uk Telephone 01698 302408 
Executive Summary
The purpose of this report is to present to Committee the summary of outstanding local
taxation accounts which are deemed uncollectible following all attempts at recovery. In
accordance with financial guidelines a provision for credit losses has previously been
established for the outstanding accounts. The total recommended for write-off in 2024/25
is £1,865,293.88. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the decision of the Chief Officer (Finance) to write off £413,426.13 for
debts under £500 under delegated responsibilities. 
(2) Approve the write-off of all items over £500 to the value of £1,451,867.75.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work Statutory / corporate / service requirement
Item 23
Page 345 of 376

Page 346

1. Background 
1.1 For the financial year 2024/25, the Council has billed £174m for Council Tax and £136m
for Non Domestic Rates charges.   
1.2 The Council follows best practice and legislation in relation to the recovery of
outstanding charges for Council Tax (including water and sewerage charges) and Non
Domestic Rates. This includes issuing reminder letters, agreeing payment plans with
individuals and business and passing outstanding debt to the Council’s contracted
Sheriff Officer, Walker Love, for further recovery action. 
1.3 Despite these processes there are a number of debts that are deemed uncollectible.
This annual process of assessing the likelihood of debt non-recovery conforms to
accepted best accounting practice and reflects a reasonable assessment of expected
income. 
1.4 Despite the recommendation for write-off, there will continue to be an appraisal of
outstanding balances to re-assess those which are deemed uncollectible, especially
where circumstances may have changed. 
2. Report 
2.1 An analysis of outstanding balances has been conducted and £1,865,293.88 has been
identified as uncollectible: 
Cause Analysis Council Tax 
£
Non Domestic
Rates
£
Total 
£
Deceased 746,888.19 0.00 746,888.19
Liquidation /
sequestration etc
300,721.67 817,684.02 1,118,405.69
Total 1,047,609.86 817,684.02 1,865,293.88    
Value Analysis   
< £500 403,634.11 9,792.02 413,426.13
>£500 643,975.75 807,892.00 1,451,867.75
Total 1,047,609.86 817,684.02 1,865,293.88 
2.2 The values written off during 2023/24 were as follows:  
Cause Analysis Council Tax 
£
Non Domestic
Rates
£
Total 
£
Deceased 1,736,073.22 0.00 1,736,073.22
Liquidation /
sequestration etc
1,379,512.56 2,468,820.47 3,848,333.03
Total 3,115,585.78 2,468,820.47 5,584,406.25 
2.3 During 2023/24 the service conducted a comprehensive review of outstanding
accounts going back to 1993 resulting in a more significant write-off figure in the
Page 346 of 376

Page 347

previous financial year. The figure proposed for write-off in 2024/25 reflects the
standard annual review process. 
2.4 Collection of local taxation is sought from all payees in the year of liability and
subsequent years with use of diligence as appropriate. The level of in year collection is
reported to each committee cycle and monitored on an ongoing basis. 
2.5 Over time the collection of outstanding sums is prevented where there is no longer any
legal basis to collect. This occurs where a person or business is subject to a
sequestration, bankruptcy, winding-up or where the estate of the deceased has no
funds to meet the debt and there is no other liable party. 
2.6 Council Tax debt for years up to and including 2018/19 have been fully provided for
and as such there is no costs to the Council associated with the write-off of these debts.
For subsequent years, the Council has made an assessment of likely irrecoverable
debts. This assessment is subject to ongoing review as part of regular monitoring of
the Council Tax position and a consideration in completing the Council’s statutory
accounts each year. 
2.7 There is no cost of the Council in respect of the Non Domestic Rates write off as this is
accounted for in the pooled funding arrangements with Scottish Government. 
3. Measures of success 
3.1  The Council continues to take all reasonable steps to recover outstanding debt. 
4. Supporting documentation 
Not applicable. 
Elaine Kemp
Chief Officer (Finance) 
Page 347 of 376

Page 348

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The write off of more recent Council Tax debts has the potential to impact on the in
year Council income position. However, this is subject to ongoing monitoring of the
overall Council Tax position and will be finalised as the Council completes its
statutory annual accounts for 2023/24.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 348 of 376

Page 349

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 349 of 376

Page 350

Page 350 of 376

Page 351

North Lanarkshire Council
Report
Housing Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref    SL/GT Date 12/02/25 
Former Tenant Arrears Write Off to 31 March 2023 
From  Stephen Llewellyn, Chief Officer (Housing)  
E-mail TelferG@northlan.gov.uk Telephone
Greg Telfer, Business
Finance Manager, 07583
010692 
Executive Summary
The purpose of this report is to present to Committee a summary of outstanding Housing
Rent debts which are deemed uncollectable following all attempts at recovery by the
Housing Rents and Court teams or are considered uneconomically viable to continue
pursuing. 
In accordance with financial guidelines a provision for expected credit losses has
previously been established for the outstanding accounts highlighted below. 
The debt to be written off relates to former tenancies where the tenancy end date is prior
to 31 March 2023. The total recommended write-off is £3,925,862 which equates to 2.62%
of the total rent income of £149,720,181. 
In addition, following a decision of the Housing Committee in August 2024 to change the
treatment of Universal Credit Assistance Fund awards from a repayable loan to a grant,
the report seeks approval to no longer pursue these loans and write-off these debts as
outlined in paragraphs 2.6 and 2.7. The total recommended for write-off is £3,336,874.09.
This creates no additional financial implications for the Housing Revenue Account because
of the previously established provision for expected credit losses. 
Recommendations
It is recommended that the Housing Committee: 
(1) Acknowledge the decision of the Chief Officer (Housing Management) and the Chief
Officer (Finance) to write off £381,165.92 under delegated responsibilities; 
(2) Approves the write off of £3,544,696.50 which includes individual debts greater than
£500; 
(3) Approves the write off of credit balances that have arisen in some former tenancy rent
accounts, totalling £50,914.31; 
(4) Approve the write off of pre August 2024 Universal Credit Assistance Fund awards
where debt is greater than £500 of £320,716.33;
(5) Acknowledge the write off of Universal Credit Assistance Fund awards where debt is
less than £500 to the value of £3,016,157.76;
(6) Remit this report to the Finance and Resources Committee. 
Item 24
Page 351 of 376

Page 352

1. Background 
1.1 The Housing Service has an average annual turnover in tenancies of approximately
3,000 with tenancies terminating for a variety of reasons. 
1.2 The Service has a full rent arrears process in place which ranges from reminder letters
at the early stages through to the pursuit of arrears via the courts. The arrears process
actively pursues debt in both current tenancies and former tenancies and only ever seeks
to write-off debt relating to former tenancies once all avenues of recovery have been
exhausted. 
1.3 A wide range of payment methods are available to tenants to enable them to make
payments towards their rents in a timely and consistent manner that suits their
circumstances. These range from Direct Debits, Online Payment facility, Standing
Orders, Post Office, Paypoint and deductions from wages. 
1.4 Early intervention and engagement with current tenants who fall into arrears is a key part
of the process to minimise the debt level that exists when tenancies terminate. However,
despite the steps in place, there are a number of debts that are deemed uncollectible or
are considered not economically viable to engage further collection activities and costs.
This annual process of assessing the likelihood of debt non-recovery follows accepted
best accounting practice and is a realistic assessment of expected outcome. 
1.5 The Annual Return on the Charter for 2023/24 published by Scotland’s Housing Network
identifies that former tenant arrears have increased across the whole sector from 1.86%
in 2020/21 to 2.47% in 2023/24.  In addition, the Council’s collection rate for rent due in
2023/24 was 99.3% which mirrors the Scottish Local Authority Average for the same
year. 
1.6 It should be noted that the Council moved onto full Universal Credit status in April 2018
and as a result, has since seen an increase in current tenant arrears. This is likely to
have an adverse impact on the future levels of former tenant arrears that will be sought
for write off. A full Income Maximisation Service is offered to all tenants to try and mitigate
the impact of welfare reform. 
2. Report 
2.1 An exercise has been undertaken to identify debt that is now considered to be non-
collectable. In accordance with financial guidelines a provision for expected credit losses
has previously been established for the outstanding accounts. 
The Plan for North Lanarkshire
Priority  Enhance participation, capacity, and empowerment across our
communities
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work Statutory / corporate / service requirement
Page 352 of 376

Page 353

2.2 There are a number of reasons why the outstanding balances are being written off and
these are summarised below: 
• Liquidation / Sequestration. The debtor has been liquidated / sequestered etc, and
there is no prospect of recovery of funds. 
• Deceased. The debtor is deceased and there have been insufficient funds within the
estate to meet the sum due. 
• Eviction / Abandonment / No Forwarding Address. The debtor has been unable
to be located following eviction or abandonment of their tenancy or have left no
forwarding address and there is no prospect of recovery of funds. 
• Recovery exhausted. All avenues of recovery have now been exhausted via our
internal processes and via the courts.  The decision has been taken not to pursue
any further.  Recovery is considered not possible. 
2.3 The following tables categorise the value of debt recommended for write-off by cause
and value: 
2.4 The write off being proposed to 31 March 2023 represents 2.62% of the total rental
income of £149,720,181. The following table outlines the value of the annual former
tenant arrears write-off over the previous 5 years: 
2.5 The Council will continues to seek collection of any outstanding balances if the
circumstances of the debtor change and recovery is deemed practical.
Cause Analysis
Write off Value No. of
Tenancies
Average
Write off
Value
2025
Average
Write off
Value
2024
£ £ £
Abandoned 723,417.29 453 1,596.95 1,191.98
Deceased 346,797.03 585 592.82 473.56
Eviction 210,368.12 52 4,045.54 1,050.12
Liquidations/Sequestration 139,232.17 45 3,094.05 2,550.55
No Forwarding Address 238,181.08 237 1,004.98 853.75
Recovery Exhausted 2,267,866.73 2,490 910.79 728.69
Total Debt 3,925,862.42 3,862 1,016.54 771.13
Credit Balances (50,914.31) 359 (141.82) (35.00)
Value Analysis
< £500 381,165.92 2,334 163.31 166.40
>£500 3,544,696.50 1,528 2,319.83 1,965.90
Total Debt 3,925,862.42 3,862 1,016.54 771.13
Former Tenant Arrears
Written Off to:
Value
£
% of
Income
30 March 2022 2,553,973.58 1.76
31 March 2021 2,610,389.37 1.82
31 March 2020 3,560,465.00 2.57
31 March 2019 3,505,183.00 2.54
31 March 2018 2,408,607.00 2.09
Page 353 of 376

Page 354

Universal Credit Assistance Fund
2.6 Members will be aware that in August 2024 the Housing Committee approved the change
in treatment of Universal Credit Assistance Fund awards from a repayable loan to a
grant. This decision was based on future awards from the fund. A total of £3,336,874.09
remains to be repaid by tenants who accepted the loan arrangement but are unable to
repay.  This covers outstanding awards for both current and former tenants since the
establishment of the UCAF awards until 28 August 2024.   
2.7 As with former tenant arrears, the service has previously fully provided for these debts
within the annual expected credit loss calculation. Therefore, the decision to no longer
pursue and subsequently write-off these debts creates no additional financial burden
on the Housing Revenue Account. 
3. Measures of success 
3.1. The Service continues to engage in several activities aimed at improving collection rates,
reducing debt arising and streamlining the recovery process. The Council will continue
to seek collection of the outstanding balance if the circumstances of the debtor alter, and
recovery is deemed practical. 
4. Supporting documentation 
Not Applicable 
Stephen Llewellyn
Chief Officer (Housing) 
Value Analysis
Write off
Value
No. of
Tenancies
Average
Write off
Value
2025
£ £
< £500 3,016,157.76 7,447 405.02
>£500 320,716.33 595 539.02
Total Debt 3,336,874.09 8,042 414.93
Page 354 of 376

Page 355

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
There are no additional financial implications linked to this report for the current
financial year as a corresponding bad debt provision has been included in the
previous year’s accounts. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 355 of 376

Page 356

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles
from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 356 of 376

Page 357

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    LR/VA/CM Date 26/02/25 
Contract award for enabling works at Strathclyde Park Watersports
Centre 
From  Lyall Rennie, Chief Officer (Community Operations)  
E-mail Renniely@northlan.gov.uk Telephone 07855 193500 
Executive Summary
This report updates committee on the appointment of Linear Design and Construct through
the Hub Southwest procurement route to deliver the design and construction work required
for the net zero led redevelopment of the Watersports Centre at Strathclyde Country Park. 
This report also outlines proposed contractual arrangements required to enter into a Design
and Build Development Agreement (DBDA) for enabling works creating a new car park
entrance and associated infrastructure at the Watersports Centre (WSC) at Strathclyde
Country Park, and removal of asbestos from the building. 
The enabling works tie in with the construction of Edinburgh University’s Boat Store, which
was approved in principle by this committee. 
The works are proposed to take place earlier than the main contract for funding and safety
reasons outlined in the report.   
The report details how the cost of the proposed enabling works contract of five hundred and
forty thousand pounds has been estimated, and how it will be awarded. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Recognise the details of the award of the main contract in October 2024 and the
process through which it is intended the council will move to financial close for the
project. 
(2) Acknowledge Edinburgh University’s progress with their Boat Store and
interdependencies between this and a subset of external access works to be
delivered in advance of the main WSC contract. 
(3) Endorse the contract award for the enabling works package in accordance with the
contents of this report with a value of no more than five hundred and forty thousand
pounds via the Hub South West process. 
Item 25
Page 357 of 376

Page 358

1. Background 
1.1 The redevelopment of the Watersports Centre at Strathclyde Country Park is an
identified deliverable in the agreed programme for the Sustainable Futures programme
of work.   
1.2 The feasibility and business case development which led to this capital project were
funded by a grant from the Scottish Government and council capital.   
1.3 In order to keep pace with the tight timeline for the project, the Environment and Climate
Change committee gave approval in August 2024 for the Hub South West procurement
process to be used to appoint a contractor to work with the council on the remaining
design and construction works required to redevelop the Watersports Centre, to a value
of circa £14million. 
1.4  The proposed Fabric First and renewable energy generation works within the
redevelopment plans are forecast to reduce carbon emissions by 90%. 
1.5 The project is currently in receipt of a Placed Based Investment Program (PBIP) grant
offer from the Scottish Government which must be spent/committed this financial year. 
1.6 Following committee approval in November 2024 Edinburgh University will shortly be
granted a lease to construct a new Boat Store within the wider curtilage of the
Watersports Centre car park and associated storage yards. 
2. Report 
Main Design and Construction Contract 
2.1 Following a competitive tendering process undertaken through Hub South West, Linear
Design and Construct have been appointed to deliver the design and construction work
required for redevelopment of the Watersports Centre at Strathclyde Country Park. 
2.2 A Planning Application for the project was submitted in December 2024 with a decision
expected in March 2025. 
2.3 The Stage 1 design process is complete. Stage 2 design which includes; required
changes to the design submitted to Planning, detailed market testing to confirm costs,
and obtaining all building warrants, will run from March to June 2025. 
2.4 If Stage 2 progresses satisfactorily, financial close on the project is expected around
July 2025, with redevelopment works starting in the autumn of 2025 and continuing
until late 2026/early 2027. A separate report would be provided to this committee in
cycle 2 of 2025 covering the full details of this proposed award. 
The Plan for North Lanarkshire
Priority  Improve the health and wellbeing of our communities
Ambition statement
(16) Transform our natural environment to support wellbeing and
inward investment and enhance it for current and future
generations
Programme of Work Sustainable Futures
Page 358 of 376

Page 359

Edinburgh University Lease and Construction License 
2.5 Edinburgh University have been granted planning permission to a boat store and a
lease and a license to occupy for construction are currently being finalised between the
council’s and Edinburgh University’s legal teams. 
2.6 Access for long trailers to the Edinburgh University facility relies on two separate
access/egress points and a one-way system which forms part of the council’s proposed
redevelopment of the Watersports Centre car park. It would be beneficial for operational
and safety reasons to construct this access shortly after the Boat Store is built. 
2.7 Edinburgh University’s construction period is proposed to run from February 2025 to
May 2025 and will enable them to move their boats out of the WSC ground floor boat
store before redevelopment of that building commences in Sept 2025, making the main
project much easier to deliver. 
Enabling Works 
2.8 Under delegated powers in line with the council standing orders, an enabling works
Design and Build Development Agreement (DBDA) contract through Hub South West,
will be awarded in advance of going to financial close on the main WSC redevelopment
contract. 
2.9 The proposed enabling works package involves creating a new entrance into the WSC
car park, building a pedestrian footpath, and reconfiguring various boat storage yards.
This will enable: 
a) New one way access systems to be created for the redeveloped WSC reducing
congestion and improving safety.
b) Two access points being available to the new Edinburgh University Boat Store
yard facilitating a drive-through system for long trailers.
c) Public/Staff and Contractor access to be completely separated during the
redevelopment of the main WSC building, reducing the health and safety risk
associated with mixing construction traffic and regular park users. 
2.10 The estimated cost of the enabling works is £450k. this has been calculated based on
a QS costings of the Stage 1 technical design and then market tested by Linear Design
and Construct, as part of the technical design team employed by Hub South West. 
2.11 A contingency of 20% to allow for costs associated with any unforeseen circumstances,
or client led changes to the design is proposed bringing the contract value to a
maximum of £540k. 
2.12 The funding for the enabling works package is in place through an offer of £830k of
funding from the Scottish Government through the Place Based Investment Program
(PBIP) and must be committed by end of March 2025. The remainder of this grant is
being spent on professional fees relating to the design works for the main
redevelopment work. Committing contractually to the enabling works before the end of
March 2025 ensures the council can utilise the full amount of Scottish Government
funding offered. 
2.13 In order to commit the PBIP funding a DBDA contract is proposed just for the enabling
works package. A larger DBDA would be entered into around July 2025 for the works
Page 359 of 376

Page 360

to the main building. Legal services are reviewing the terms of the contract which is
based on similar enabling works contracts entered into for the Community Hub projects. 
2.14 The contract would be let in March 2025 with works forecast to start May 2025
immediately after Edinburgh University conclude the construction of their Boat Store.
Enabling works would take place between May and September 2025 with works to the
main Watersports Centre building potentially starting immediately after. 
3. Measures of success 
3.1 Utilisation of the PBIP grant offer. 
3.2 Provision of through traffic access to the Edinburgh University Boatstore. 
3.3 Improved health and safety and traffic flow. 
4. Supporting documentation 
none 
Lyall Rennie
Chief Officer (Community Operations) 
Page 360 of 376

Page 361

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☒ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 361 of 376

Page 362

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact?
The main contract will reduce the carbon footprint of the building
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 362 of 376

Page 363

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes ☒ No
Ref: NLC–SLP-24-018 Date: 26 February 2025 
Contract Award for Recover NL Programme Pitch Upgrades 
From  James McKinstry, Chief Officer (Assets and Procurement) 
E-mail McKinstryJ@northlan.gov.uk  Telephone: Charles McCabe – 07946
353323 
Executive Summary 
Approval was given at Policy and Strategy Committee September 2022, to conduct a feasibility
study and then undertake a procurement exercise to deliver a number of grass-to-synthetic pitch
upgrades as part of the Recover NL Pitch Improvement Programme. 
Following the feasibility study, it was determined that for the allocated budget of £3.2M (which
included both RecoverNL funds and a council capital allocation), pitch upgrades could be made at
Moodiesburn, Harthill, and Cleland. 
A competitive procurement was conducted by Hub South-West on behalf of the council, resulting in
the recommendation to award a contract to the most economically advantageous tenderer, W.H.
Malcolm Limited, at a cost of Three Million One Hundred and Eighty-Six Thousand Nine Hundred
and Fifty-Nine Pounds and Thirty-One Pence (£3,186,959.31) exclusive of VAT. 
In accordance with the council’s General Contract Standing Orders, item 21.3.2, approval was
sought from the Deputy Chief Executive, to expedite the contract award in between Committee
cycles. 
Recommendations 
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the content of this report. 
The Plan for North Lanarkshire 
Priority All priorities
Ambition Statement All ambition statements
Programme of Work Transforming Places 
Item 26
Page 363 of 376

Page 364

1. Background 
1.1. At Policy and Strategy Committee in September 2022, a number of options were presented
to Committee for the Recover NL Pitch Improvement Programme. Committee approved the
project team to conduct a feasibility study then a undertake a procurement to deliver a
number of grass-to-synthetic pitch upgrades at various locations. It was always anticipated
and understood that any and all works were dependent on both available funding, and
suitable locations. 
1.2. A comprehensive study was conducted, considering various factors such as parking,
changing accommodation, and floodlighting. 
1.3. Following the feasibility study, it was determined that the budget of £3.2M would feasibly
convert three grass pitches across the North Lanarkshire area to synthetic all weather
pitches.   
1.4. The council used its territory partnership agreement with Hub South-West to undertake the
competitive procurement to appoint a Contractor to deliver grass-to-synthetic pitch upgrades. 
2. Report 
2.1. The council used the Hub South-West vehicle for procurement. Five companies were
invited to tender, three submitted a tender proposal. 
2.2. The highest scoring tenderer was W.H. Malcolm Limited, and they were proposed to the
council as the recommended Contractor. 
2.3. Approval was sought from the Deputy Chief Executive, in accordance with General
Contract Standing Order 21.3.2, to expedite the contract award in between Committee
cycles. 
2.4. Following approval, a contract award was made to W.H. Malcolm Limited, with final contract
signing completed 11th November, which led to the immediate commencement of works. 
Financial / Budget Consideration 
2.5. The pre-tender wholelife estimate budget for the Agreement was £3.2M. The successful bid
was £3,186,959.31 exclusive of VAT including all associated contingencies and fees. 
2.6. The costs associated with delivery of the Agreement will be contained within the capital
budget for Forward Planning, Assets & Procurement. 
Price Stability 
2.7. It is a fixed price proposal from W.H. Malcolm Limited and costs will be managed in
accordance with the Agreement terms and conditions. 
Community Benefits and Fair Work First 
2.8. In the tender scoring model, a 10% weighting was allocated to Community Benefits and
Social Value. The proposal from W.H. Malcolm Limited identified the use of local
enterprises which includes: employment opportunities, staff training and development. The
utilisation of local business and suppliers will support the reduction of the carbon footprint
on the project. W.H. Malcolm also provide other opportunities through workshops in
construction. 
Page 364 of 376

Page 365

Contract Management 
2.9. Officers from Active and Creative Communities will be responsible for managing the
contractor which will be undertaken in accordance with the contract and supplier
management conditions. 
3. Measures of success 
The contract will deliver the following outcomes: 
3.1. Best Value, by evaluating not only the cost of materials and workmanship but also factors,
such as long-term maintenance, sustainability practises and previous experience in delivering
similar projects. 
3.2. Appointment of a contractor who has the experience and capability to provide the requirements
in an efficient form of arrangement.  
3.3. Conclusion of a procurement procedure - compliant with procurement legislation and internal
procedures. 
3.4. Delivery of a range of Community Benefits as outlined in section 2.9 above. 
4. Supporting documents 
Appendix 1 Summary of Tender Evaluation Process
Appendix 2 Summary of Procurement Process
Appendix 3 SME Status and Location of All Tenderers 
James McKinstry
Chief Officer (Assets and Procurement) 
Page 365 of 376

Page 366

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Budget is available via the approved capital budgets. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 366 of 376

Page 367

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The utilisation of local business and suppliers will support the reduction of the carbon
footprint on the project. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from the
United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out? 
Yes ☐ No ☐  
Page 367 of 376

Page 368

Appendix 1 – Summary of Tender Evaluation Process 
Final
Rank Tenderer Name Total Tender
Score
Recommended
for Award     
(Yes / No)
1 W.H. Malcolm Limited  95.50% Yes
3 Fairways (Gm) Limited 92.87% No
2 Allsports Construction & Maintenance Limited 89.64% No 
Page 368 of 376

Page 369

Appendix 2 – Summary of Procurement Process 
Response
CPT Contract Reference Allocated: NLC-SLP-24-018
Procurement Procedure Utilised: Further Competition via HubSW
Governing Legislation / Regulations: Public Contracts (Scotland) Regulations 2015
Date Contract Strategy Approved: 18 June 2024
Number of Companies Invited to Take Part: Five (5)
Date ITT Published: 07 June 2024
Tender Return Deadline: 20 July 2024
Number of Tenders Received: Three
Tenders from SME’s: Two
Tenders from NLC Based Tenderers:  None
Tenders from Supported Businesses: None
Number of Non−compliant Tenders: None
Number of Compliant Tenders: Three
Number of Recommended Tenderers: One
Evaluation Team: HubSW
Anticipated Start Date of the Agreement: 23 September 2024
Total Agreement Period: 22 Weeks
Awarded Value of the Agreement: .£3,186,959.31
Basis of Award: Quality: 20% Price: 80%
Evaluation Team: HubSW
Agreement Award Date 11 November 2024
Start Date of the Agreement: 11 November 2024
Total Agreement Period: 22 Weeks
Awarded Value of the Agreement: £3,186,959.31  
Page 369 of 376

Page 370

Appendix 3 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
Allsports Construction & Maintenance Limited Small Midlothian
Fairways (Gm) Limited Medium Renfrewshire
W.H. Malcolm Limited Large Renfrewshire 
Page 370 of 376

Page 371

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    JMcK/CPT Date 26/02/25 
Contracts awarded below Committee approval threshold 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail McKinstryJ@northlan.gov.uk  Telephone 07939 281 102 
Executive Summary
In accordance with the Council’s General Contract Standing Orders (“GCSOs”), GCSO
21.10 requires a summary report be presented to members with details of contracts
awarded since last committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the contract awards made since last committee reporting cycle.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 27
Page 371 of 376

Page 372

1. Background 
1.1 The Local Government (Scotland) Act 1973 section 81 requires local authorities to
“…make standing orders with respect to the making by them or on their behalf of
contracts for the supply of goods or materials or for the execution of works.”. 
1.2 The Council’s General Contract Standing Orders (“GCSOs”) set out the council’s
specific procurement procedures and responsibilities at all spend levels, and include
the reporting requirements of procurement activity, including contracts awards, to
committee for either approval or acknowledgement. 
2. Report 
2.1 In accordance with GCSO 21.10, this report summarises the contract awards since last
committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
2.2 If you require further information regards the contract awards reported, please refer to
the lead service area / Chief Officer detailed in the appendix. 
3. Measures of success 
3.1 All requirements contracted contribute to either the council’s programme of work and/or
fulfil a statutory requirement. 
3.2 All contract awards secure best value for the council in accordance with their evaluation
criteria. 
3.3 All necessary diligence has been undertaken in the evaluation and appointment of
contractors. 
3.4 All contract awards are logged in the council’s contract register. 
4. Supporting documentation 
4.1 Appendix 1 – Summary of contracts awarded. 
James McKinstry
Chief Officer (Assets and Procurement) 
5. Impacts 
5.1 Impacts considered as part of the contract award procedures are recorded in the
individual contract award reports held by the lead service area.  
Page 372 of 376

Page 373

Appendix 1 – Summary of Contracts Awarded 
Contract Ref NLC-SLP-24-032
Title Provision of Cash Collection Services 2024/25
Classification Services
Lead Service Area / Chief Officer Elaine Kemp, Chief Officer (Financial Solutions)      
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Call-off following Direct Award using Third Party Framework
No. of Framework Contractors 4
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments This has been procured via Direct Award approach, considering the relevant information on
Framework Contractors technical and commercial proposals available through the ESPO Framework
Agreement for Cash/Valuables Collection & Cash/Valuables in Transit (CViT) Services (324F_24), Lot 1 –
Cash/Valuables Collection & CViT Services from premises or buildings.     
Award
Details
Value £107,000
Contract Duration 12 months
Contractor Name Security Plus Limited
Contractor Size Medium
Contractor Location Stoke-On-Trent, Staffordshire
Status - Payment of Living Wage? No
Status - Living Wage Accredited? No      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☐
HR Policy Impact ☐ Data Protection Impact ☐ Environment / Carbon
Impact ☐
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☐
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 373 of 376

Page 374

Contract Ref NLC-SLP-24-058
Title Engage Process Modeller
Classification Supplies
Lead Service Area / Chief Officer Katrina Hassell, Chief Officer (Business & Digital Solutions)      
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Call-off following Direct Award using Third Party Framework
No. of Framework Contractors Over 5,000 suppliers on G-Cloud 13 framework
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments This has been procured via Direct Award approach, considering the relevant information on 
Framework Contractors technical and commercial proposals available through Crown Commercial
Services (CCS) – GCloud13 framework. Lot 2 – Cloud Software (RM1557.13).     
Award
Details
Value £83,800
Contract Duration 36 months
Contractor Name Engage Process UK LTD
Contractor Size Micro company
Contractor Location Chichester, West Sussex
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? No      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☐
HR Policy Impact ☐ Data Protection Impact ☐ Environment / Carbon
Impact ☐
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☒
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 374 of 376

Page 375

Contract Ref NLC-SLP-24-078
Title Intelligent Email Security (Defend and Prevent)
Classification Supplies
Lead Service Area / Chief Officer Katrina Hassell, Chief Officer (Business & Digital Solutions)      
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Call-off following Direct Award using Third Party Framework
No. of Framework Contractors Over 5,000 suppliers on G-Cloud 13 framework
Award Criteria Best Value assessment, in accordance with the Framework Information
Comments This has been procured via Direct Award approach, considering the relevant information on 
Framework Contractors technical and commercial proposals available through Crown Commercial
Services (CCS) – GCloud13 framework. Lot 2 – Cloud Software (RM1557.13).     
Award
Details
Value £228,000
Contract Duration 12 months, option for further 12 months
Contractor Name Egress Software Technologies Limited
Contractor Size Large Company
Contractor Location Greater London
Status - Payment of Living Wage? No
Status - Living Wage Accredited? No      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☐
HR Policy Impact ☐ Data Protection Impact ☒ Environment / Carbon
Impact ☐
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☒
Communications Impact
☒
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 375 of 376

Page 376

Contract Ref NLC-SLP-24-033
Title Coatbridge; Proposed Development of Existing Carnbroe Primary School
Classification Works
Lead Service Area / Chief Officer James McKinstry, Chief Officer (Assets & Procurement)      
Competition Governance by Value The Framework terms & conditions, with adherence to the council’s GCSO 13 on 3rd party frameworks
Procurement Route Call-off following Mini Competition using Third Party Framework.
No. of Framework Contractors 14
No. of Bids Received 2
Award Criteria Most Economically Advantageous Tender, in accordance with the Framework Information.
Evaluation Scores – Successful 96.4%
Evaluation Scores – Unsuccessful Non-compliant therefore no score provided
Comments Mini Competition from the Scottish Procurement Alliance Framework Agreement for Public Buildings
Construction and Infrastructure (PB3), Workstream 3 – New Build and Refurbishment.     
Award
Details
Value £1,698,882
Contract Duration 6 and a half months
Contractor Name Clark Contracts Limited
Contractor Size Large Company
Contractor Location Paisley, Renfrewshire
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? No      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☐
HR Policy Impact ☐ Data Protection Impact ☐ Environment / Carbon
Impact ☒
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☒
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☐
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 376 of 376