Page 1

11 November 2024 
Members of the 
Finance and Resources Committee
Chief Executive’s Office
Archie Aitken
Chief Officer (Legal & Democratic)
Civic Centre, Windmillhill Street,
Motherwell ML1 1AB
www.northlanarkshire.gov.uk 
Notice is given that a Meeting of the Finance and Resources Committee is to be held in
the Council Chamber, Civic Centre, Windmillhill Street, Motherwell, ML1 1AB on
Wednesday, 20 November 2024 at 10:00 AM which you are requested to attend. 
The agenda of business is attached. 
Archie Aitken
Chief Officer (Legal & Democratic) 
Members : 
Clerk Name: Karen Swan
Clerk Telephone: 
Clerk Email: swank@northlan.gov.uk 
A Duffy-Lawson, H Dunbar, A Ballinger, M Boyd, G Brennan, A Bustard, T Carragher, C
Costello, S Coyle, D Crichton, G Currie, K Duffy, H Gray, J Hume, D Johnston, T Johnston,
P Kelly, J Keltie, K Larson, G Lennon, J Logue, H Loughran, A Masterton, P McDade, R
McKendrick, J McLaren, M McPake, J McPhilemy, L Nolan, P Patton, L Roarty, G Robinson,
W Shields, A Smith, A Stubbs, L Stubbs, R Sullivan, S Watson, C Williams, G Woods.  
Page 1 of 218

Page 2

Page 2 of 218

Page 3

Agenda 
1 Declarations of Interest In Terms of the Ethical
Standards In Public Life Etc. (Scotland) Act 2000   
Operational   
2 Revenues and Benefits Update
Submit report by the Chief Officer (Finance) providing
an update on the performance with the Revenues and
Benefits functions of Finance as at 30 September
2024. 
7 - 14 
3 Digital North Lanarkshire Programme of Work –
Digital Culture, Knowledge and Leadership
Submit report by the Chief Officer (Housing) providing
an overview of the progress on the Digital Culture,
Leadership and Knowledge Sub Group. 
15 - 24  
Performance   
4 Strategic Performance Framework - latest
performance results for Finance
Submit report by the Chief Officer (Finance) providing
an update on the suite of performance indicators used
by Finance. 
25 - 36 
5 Strategic Performance Framework - Latest
Performance Results - Assets and Procurement
Submit report by the Chief Officer (Assets and
Procurement) providing an update on the suite of
performance indicators used by Assets and
Procurement. 
37 - 48 
6 North Lanarkshire Properties LLP - Performance
Indicators - 1 April to 30 September 2024 and
Financial Performance as at 19 July 2024
Submit report by the Chief Officer (Assets and
Procurement) providing details of North Lanarkshire
Properties LLP's performance for the period from 1
April to 30 September 2024 and providing an update
on the financial performance for the period from 1 April
to 19 July 2024. 
49 - 64  
Financial   
Page 3 of 218

Page 4

7  Revenue Monitoring Report Council Summary 1
April 2024 to 13 September 2024
Submit report by the Chief Officer (Finance) (1)
providing an update on the overall position for the
General Fund Account, Housing Revenue Account and
Adult Health and Social Care, for the financial year to
31 March 2025; (2) consolidating the budget monitoring
position of all Services, and (3) highlighting and
explaining major outturn variances as per the Council's
approved Financial Regulations. 
65 - 74 
8 Revenue Budget Monitoring Report - Chief
Executive's Service 1 April to 13 September 2024
(Period 6)
Submit report by the Chief Officer (Finance) (1)
providing a summary of the Chief Executive's financial
performance for the period from 1 April to 13
September 2024 (Period 6) and (2) illustrating the
provisional outturn as at 31 March 2025, with major
outturn variances highlighted and explained as per the
Council's approved Financial Regulations. 
75 - 86 
9 Capital Monitoring 2024/25 Monitoring Report
Submit report by the Chief Officer (Finance) (1)
providing an update on the 2024/25 resources and
expenditure for the Council's Strategic Capital
Investment Programme, and (2) detailing the 2024/25
projected outturn position and resultant variances. 
87 - 98 
10  Chief Executive Service - Capital Monitoring Report
1 April to 13 September 2024 (Period 6)
Submit report by the Chief Officer (Finance)
highlighting the financial performance and projected
outturn of the 2024/25 Chief Executive's capital
programme for the period up to 13 September 2024. 
99 - 106 
11  Treasury Management Monitoring Report for
Quarter Ending 30 September 2024
Submit report by the Chief Officer (Finance) informing
on the quarterly Treasury Management activity for the
period from 1 July to 30 September 2024 and
compliance with the mandatory treasury and prudential
indicators. 
107 - 124
Page 4 of 218

Page 5

12  2024 Review of Financial Regulations and Scheme
of Financial Delegation
Submit report by the Chief Officer (Finance) providing
details of the outcome of the annual review of the
Financial Regulations and Scheme of Financial
Delegation. 
125 - 162 
13  Procurement and Commercial Improvement
Programme ("PCIP") Assessment Results for North
Lanarkshire Council 2023/24
Submit report by the Chief Officer (Assets and
Procurement) advising of the outcome of the third
round of the Procurement and Commercial
Improvement Programme (PCIP) assessments
undertaken by Scotland Excel. 
163 - 182 
14  Microsoft Enterprise Agreement 2025-2028 –
Procurement Update
Submit report by the Chief Officer (Business and
Digital) providing an update on procurement activity
relating to the Microsoft Enterprise Agreement (EA)
contract and seeking approval to progress procurement
arrangements. 
183 - 190 
15  Local Public Holidays for Factories and
Businesses 2025
Submit report by Chief Officer (Legal and Democratic)
seeking consideration of the local public holidays in
calendar year 2025 for factories and businesses in
North Lanarkshire. 
191 - 194  
Contracts   
16  Contract Award for Provision of Domestic Furniture
& Furnishings 2024-2027
Submit report by the Chief Officer (Finance) seeking
approval to award the the contract for the Provision
of Domestic Furniture and Furnishings 2024-2027 to
CF Services Limited. 
195 - 204 
17  Contract Award for Supply and Delivery of
Janitorial Products
Submit report by the Chief Officer (Community
Operations) notifying the award of a contract for Supply
and Delivery of Janitorial Products (the ‘Agreement’) to
Arrow County Supplies Limited. 
205 - 214
Page 5 of 218

Page 6

18  Contracts awarded below Committee approval
threshold
Submit report by the Chief Officer (Assets and
Procurement) notifying of the Contracts Awarded since
the last meeting of the Committee with a value below
the financial threshold requiring approval. 
215 - 218  
EXCLUSION OF PUBLIC
The Sub-Committee is asked to consider passing the
following resolution: "That under Section 50A(4) of the
Local Government (Scotland) Act 1973, the public be
excluded from the meeting for the following item of
business on the grounds that it involves the likely
disclosure of exempt information as defined in
paragraph 6 and 9 of Part 1 of Schedule 7A of the Act". 
19  Disposal of Site at Napier Road, Cumbernauld
Submit report by the Chief Officer (Asset and
Procurement) seeking approval to dispose of the Site
at Napier Road, Cumbernauld. 
20  Future Acquisitions within South Cumbernauld
Community Growth Area
Submit report by the Chief Officer (Asset and
Procurement) seeking approval to undertake future
acquisitions within the South Cumbernauld Community
Growth Area to facilitate future development proposals.   
21  Ground Lease for Edinburgh University Boat Store,
Strathclyde Country Park, Motherwell
Submit report by Chief Officer (Assets and
Procurement) seeking approval to lease ground at
Strathclyde Country Park. 
Page 6 of 218

Page 7

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    EK / GT Date 20/11/24 
Revenues and Benefits Update 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail kempe@northlan.gov.uk Telephone 01698 302408 
Executive Summary
This report provides an update on the performance within the Revenues and Benefits
functions of Finance as at 30 September 2024. 
Key points to note include: 
• As at 30 September 2024, 55.59% of Council Tax due for 2024/25 had been
collected. This is an increase of 0.30% from the same period last financial year. 
• Non-Domestic Rates collection at 30 September 2024 is 42.91% of the total annual
charge. This is an increase of 0.11% from the same period last financial year. 
• The service continues to meet statutory timescales for administering benefits
applications and changes of circumstance. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the content of the report. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work Statutory / corporate / service requirement
Item 2
Page 7 of 218

Page 8

1. Background 
1.1 The Finance service is responsible for the administration and collection of all local
taxation in North Lanarkshire in the form of Council Tax and Non Domestic Rates. 
1.2 In addition, the service administers a number of benefits for residents of North
Lanarkshire including Housing Benefit, Council Tax Reduction, Scottish Welfare Fund,
Discretionary Housing Payment, Free School Meals, Clothing Grants and Blue Badges. 
2. Report  
Council Tax 
2.1 The graph below shows the cash collected at 31 September for each financial year. It
is worth noting that cash is allocated to specific Council Tax years so the graph
represents cash received against the initial billing year (i.e. billed and received in
2024/25) and does not include cash collected in subsequent years (i.e. billed in 2023/24
but received in 2024/25). This ensures a like for like comparison. 
2.2 The collection figure to 30 September in the 2024/25 financial year of 55.59% is 0.30%
higher than the same period last financial year. 
2.3 It should be noted that in-year collection of Council Tax is a Statutory Performance
Indicator. However, it does not reflect the overall collection rate of Council Tax which
includes collection of prior year arrears. This latter measure has a greater bearing on
the Council’s finances and is reflected in the regular budget monitoring reports to
Committee. 
Page 8 of 218

Page 9

Non-Domestic Rates 
2.4 The following graph shows the cash collected at 30 September for each financial year: 
2.5 The collection figure to 30 September in the 2024/25 financial year is 22.91%. This
represents an increase of 0.11% compared to the same time period in 2023/24. 
Housing Benefits 
2.6 The data below highlights the Statutory Performance Indicators measuring the speed
of processing for new Housing Benefit claims and for changes in circumstances. The
table below shows the cumulative figures for the 2024/25 financial year. 
Days to Process 2023/24 2024/25
Latest
available
Scottish
average
New Claims  16 14 17
Change of Circumstances  9 10 2 
2.7 The service continues to perform well in the speed of processing for new claims
compared to the most recent Scottish average. The speed and accuracy of professing
has been commented on positively by the Department for Work and Pensions during
recent liaison discussions. 
2.8 The service also continues to meet statutory requirements for the speed of processing
changes of circumstance. To further improve efficiency the service is progressing a
number of digital related improvements such as development of the Landlord Portal
and robotic process automation for a number of high-volume tasks. The Landlord Portal
has recently gone live; therefore, it is anticipated that this action will see an
improvement in the handling of correspondence received direct from landlords 
Council Tax Reduction Scheme 
2.9 As at 30 September 2024 a total of £26.333m in Council Tax Reduction has been
awarded for the 2024/25 financial year. This compares to £25.980m to the same period
during 2023/24, representing an increase of £0.353m (1.36%).
Page 9 of 218

Page 10

2.10 The service received 3,445 applications between 1 April and 30 September 2024
compared with 3,994 during 2023/24, representing an decrease of 13.7% 
2.11 The service received an increased number of notifications for changes in
circumstances. From 1 April to 30 September 2024 a total of 75,264 changes were
processed compared to 61,495 for the previous financial year; an increase of 22.4%. 
Discretionary Housing Payments (DHP) 
2.12  From 1 April 2017 funding for DHP has been devolved to Scottish Government. This
funding supports both the Scottish Government’s commitment to fully fund the
implications of the Bedroom Tax and an additional sum available for other reasons such
as the Benefit cap and the restrictions on Local Housing Allowance rates. 
2.13 From 1 January 2023 the Scottish Government is fully funding the implications of
mitigating the benefit cap. This was announced as part of the tackling child poverty
delivery plan ‘Best Start, Bright Futures’ in March 2022. Local authority Leaders have
agreed to fuller benefit cap mitigation through the DHP scheme from 1st January 2023.
For 2024/25 the Scottish Government has provided ring-fenced funding of £0.436m to
mitigate the benefit cap.  As at 30 September, the amount paid and committed in
respect of the benefit cap was £0.047m (11%). 
2.14 As at 30 September 2024 the total paid and committed in respect of Bedroom Tax was
£5.723m. In comparison, this sum was £5.462m at the same point during 2023/24. 
2.15 In addition the Council also receives £0.459m in respect of non-bedroom tax related
issues. An additional £0.051m has been received for 2024/25 due to a redistribution of
collective unused funds for 2023/24 bringing the total budget to £0.511m. As at 30
September 2024 £0.304m (60%) has been paid or committed from the fund. 
2.16 As in previous years, the service will continue liaising with colleagues in Housing and
Housing Associations to encourage applications to the fund. In addition, the service will
also liaise with Universal Credit claimants affected by the benefit cap who could
possibly be eligible for the mitigation. 
Scottish Welfare Fund 
2.17 The Council has administered the Scottish Government’s Scottish Welfare Fund (SWF)
since 1 April 2016. 
2.18 The Scottish Government provides an annual award budget of £2.760m to North
Lanarkshire Council. As highlighted at the previous Committee, now that additional
one-off funding has been exhausted the service has started the 2024/25 financial year
assessing applications at High priority. This means that applications will only be
considered where there is immediate and severe need, applicants are highly
vulnerable, where there will be significantly adverse impacts to health and wellbeing
with a no grant award and where the effect of the grant is immediate and substantial.
Staff assessing Scottish Welfare Fund applications are highly trained in making these
judgements in accordance with the statutory guidance and where an application is
unsuccessful they will signpost the applicant to other community based supports. 
2.19 There are two grant schemes and their relative performance during 2024/25 and prior
year comparison is as follows: 
Page 10 of 218

Page 11

2024/25 
Applications
Assessed
Awards Unsuccessful
Applications
Acceptance
Rate
Crisis Grants 10,079 7,249 2,830 71.9%
Community Care
Grants
2,565 1,838 727 71.6%
Total 12,644 9,087 3,557 71.8% 
2023/24 
Applications
Assessed
Awards Unsuccessful
Applications
Acceptance
Rate
Crisis Grants 10,109 7,864 2,425 77.7%
Community Care
Grants
2,707 2,215 492 81.8%
Total 12,816 10,079 2,917 78.6% 
2.20 As at 30 September 2024, the total financial value of grants paid from the Scottish
Welfare Fund amounted to £1.971m which represents 71.4% of the total budget for the
current financial year. The Scottish Welfare Fund is highly likely to overspend in the
current financial year so the service may have to consider moving to assess
applications at High and Most Compelling priority in accordance with Scottish
Government guidance. The financial impact will be managed through other
underspends materialising within the Finance division and the wider Chief Executive’s
service.   
2.21 During 2024/25, the Scottish Welfare Fund has seen a small decrease in demand for
Crisis applications of 0.7% and a slight reduction in demand for Community Care Grant
applications of 5.3%. 
2.22 The Service strives to assess applications within the timescales outlined within Scottish
Government guidance. Throughout the period the service has largely continued to
assess Crisis applications within the two working day time limit. It has been more
challenging to meet the 15 working day time limit for Community Care Grants with the
service currently assessing applications outwith that timeframe, however, the service
fastracks applications linked to homelessness to support the wider Rapid Rehousing
and Homes First strategies. 
Clothing Grants and Free School Meals 
2.23 The Finance service administers Clothing Grant payments and applications for Free
School Meals on behalf of the Council for families meeting low-income eligibility criteria. 
2.24 Up to 30 September 2024 the service administered and paid out 11,512 Clothing
Grants compared to 11,363 by the end of September 2023. 
2.25 The Service awarded 9,876 Free School Meal applications to 30 September 2024
compared to 9,958 to the same period in 2023. 
Blue Badges 
2.26 The Finance service administers the Blue Badge scheme in accordance with Scottish
Government guidance. The eligibility criteria means that some are automatically
entitled to a Blue Badge. In other cases, the Council assesses an individual’s eligibility
Page 11 of 218

Page 12

which may include the requirement for a mobility assessment and meeting a healthcare
professional. 
2.27 As at 30 September 2024, the service administered 6,246 Blue Badge applications with
4,720 awarded (75.6% award rate). Over the same period in the 2023/24 financial year
the service administered 4,915 applications with 3,735 awarded (76.0% award rate). 
2.28 Scottish Government guidance states that applicants should receive a decision on their
application in around 12 weeks. The Council is currently reaching a decision within 6
weeks. 
3. Measures of success 
3.1  Continuous improvement in processing and collection rates.   
4. Supporting documentation 
None 
Elaine Kemp
Chief Officer (Finance) 
Page 12 of 218

Page 13

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 13 of 218

Page 14

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
The Service has been liaising with Business and Digital on the Landlord Portal and
RPA developments and these will be managed in line with Business and Digital’s
available resources. 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC).  
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 14 of 218

Page 15

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    SL/LJ Date 20/11/24 
Digital North Lanarkshire Programme of Work – Digital Culture,
Knowledge and Leadership 
From  Stephen Llewellyn, Chief Officer (Housing)  
E-mail LlewellynS@northlan.gov.uk Telephone 07939 280680 
Executive Summary
Members of the Committee are aware of the reporting requirements of the Programme of
Work to 2028 and the responsibility to report the areas of work from the Digital North
Lanarkshire Programme of Work Board which sit within this Committee’s terms of
reference. 
This report provides an overview of progress to date from the Digital Culture, Leadership
and Knowledge sub-group and focusses specifically on the digital adoption work carried
out in 2023 and followed up with a digital maturity assessment survey in 2024. 
Thereafter a number of next steps and recommendations are contained herein. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the contents of the report;
(2) Support the further development of the Council’s Digital Maturity Assessment and:
(3) Endorse the next steps contained herein.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (23) Build a workforce for the future capable of delivering on our
priorities and shared ambition
Programme of Work Digital North Lanarkshire
Item 3
Page 15 of 218

Page 16

1. Background 
1.1 Members are aware of the Programme of Work to 2028 to support the delivery of The
Plan for North Lanarkshire and the reporting requirements contained therein. 
1.2 Digital North Lanarkshire is one of seven priorities contained within the POW to 2028
with the aim of developing a skilled digital workforce, promoting an innovative,
sustainable culture and being the digital leader for a transformed North Lanarkshire.
This priority is a key enabler in delivering the other Programme of Work priorities and
driving economic growth as well as transforming the education and abilities of learners
of all ages. 
1.3 The Digital North Lanarkshire Board drives the delivery of the following through a
portfolio of programmes, projects and activities:    
• Increasing the council’s digital maturity level. 
• Enabling services to develop skilled employees. 
• Enabling services to design and adopt innovative solutions and react quicker to
external demands and financial challenges, increasing efficiency and
compliance. 
• Promoting a data-led and self-adapting service redesign culture 
1.4 In order to deliver on the portfolio outlined above four sub-groups have been
established.  One such sub-group is Digital Culture Leadership and Knowledge which
was stood up in September 2023 with responsibility for four activities: 
Activity
No.
Overview
1 Create a mature and sustainable culture across the organisation to ensure
that digitisation of Council services provided to the public successfully
transition them to achieve the outcomes specified within The Plan for North
Lanarkshire
2 Develop Digital Leaders to facilitate behavioural change required to enable
service transformation within existing resources
3 Develop and deploy a self-adapting redesign framework to accelerate
digital business transformation of critical council functions
4 Support development of a skilled workforce to foster consistent knowledge,
improve digital adoption and accelerate digital-first business capabilities 
1.5 This report provides Committee with an update on the work of the sub-group with regard
to Activity 1 above.   
2. Report 
2.1 Members are aware that Policy and Strategy Committee approved the indicative 5-year
digital transformation programme in March 2019.  Since that time digital transformation
across the Council and its communities has been underpinned by the Digital and IT
Strategy which sets out six principles that ultimately mean people come first regardless
of the activity being delivered.  The latest version of the Digital and IT Strategy (2024-
2027) was approved at the Policy and Strategy Committee in March 2024.   
Page 16 of 218

Page 17

2.2 During the development of the strategy, stakeholder engagement carried out re-
enforced that the undernoted six principles remain as relevant as when they were first
developed in early 2020. 
2.3 By following these principles, this will enable a significant shift in mindset and culture
in terms of how the Council conducts its business.  A greater emphasis will now be
placed on the public interacting and using council services through digital methods. 
These achievements would not have been possible without the considerable effort of
employees from across the services with employees at the heart of any digital
transformation as change is implemented. 
2.4 Over the latter part of 2023 members of the Digital Culture, Knowledge and Leadership
sub-group carried out a number of pieces of research to better understand the past and
present culture of the organisation.   
2.5 The first step was a review of the survey carried out in April 2023 by the Infrastructure
Manager within Business and Digital to examine digital adoption across services,
(particularly the use of M365) and at various levels.  The results showed: 
70% understood the value of the digital workplace.   
41% found their work more interesting as a result of applying digital tools 
73% actively supported change 
73% have participated in learning 
52% didn't feel they have opportunities to decide what tools to use for their jobs 
47% agreed with having opportunities to develop new skills and show capability 
76% agreed they found digital workplace tool useful in their jobs 
28% stated using the tools help them feel more valuable in their job but 55% agreed
that IT does support personal development 
Page 17 of 218

Page 18

2.6 In order to further investigate the above findings and to create a baseline measurement
for digital adoption, which will be crucial in supporting the organisation to understand
the current state of technology use and readiness for digital maturity, a digital maturity
assessment was developed.   
2.7 Ultimately, this will support the identification of gaps in digital capabilities thus providing
opportunities for improvement. This baseline will aid the setting of realistic goals,
measuring progress, and will inform strategic planning and decision-making. It will also
help drive user engagement and adoption through targeted strategies, including the
Digital and IT Strategy 2024-24, leading to the full realisation of the value of digital
technologies. 
2.8 The sub-group has been working with Gartner.com, who provide research, advice and
tools and techniques to aide organisations with developmental research.  The focus
has been on the five steps to change culture model as detailed below: 
Stage 1 – Understand the Culture 
2.9 Much of the work of the sub-group to date has focussed on step one above as adoption
and readiness for change is the biggest challenge for any organisation.  The need to
cultivate a positive digital culture is a basic aspect of any transformation cycle. 
2.10 In order to gain greater insight into the current thinking of employees across services a
series digital maturity survey was issued between April and June 2024.  The surveys
had a collective response rate of 16.1% response rate.  82% of the overall responses
showed a positive result. 
2.11 When drilling further into the questions for change/digital adoption the Chief Executive’s
service was the most positive (81.06%) with the responses reducing to 76.19% within
Adult Health and Social Care. 
Page 18 of 218

Page 19

2.12 Under 25s were consistently the most positive with almost 96% dropping to 81% for
those aged 40-55 when asked about readiness for change/digital adoption. 
2.13 However, as the questions began to ask about knowledge of accessing support for the
adoption of new technologies the overall results showed a drop to 69.16% being
positive with those under 25 dropping to 61.36% 
2.14 When asked about staff readiness for change and actively participating in updating and
implementing business processes the drop continued with 63% overall feeling ready
for change. 
Page 19 of 218

Page 20

Understanding the Culture - Summary 
2.15 In summary, respondents are positive about the Council’s readiness for change/digital
adoption.  Respondents have confirmed that change and transformation aligns with the
priorities set out in The Plan for North Lanarkshire and they recognise that the Council
is ready, and supportive, of change/digital adoption. 
2.16 There is a recognition that the tools available have enhanced team collaboration as
well as enhancing their own efficiency and productivity. 
2.17 However, respondents advised that their own readiness for change and actively
participating in change is not as positive as the responses for the Council as a whole. 
Accessing support for the adoption of new technologies, particularly those under-25
has been highlighted an area to be further investigated. 
2.18 The survey offered respondents an opportunity to provide details of further support that
could be given to employees as part of the digital culture change activities.  29% of
respondents mentioned training requirements with 26% of those asking for one form or
another of face to face training to be provided.   
Next steps 
2.19 The Digital Culture Leadership and Knowledge sub-group will review the narrative from
the open questions contained within the Digital Maturity Survey and the previously
mentioned digital adoption survey and agree a development plan in line with the key
objectives highlighted at Section 1.3 of this report. 
2.20 Further work will focus on developing the Culture Change Roadmap (Appendix 1) for
the organisation, with development work focussing on Stage 2 as illustrated. 
3. Measures of success 
3.1 Success will be measured through the set of performance indicators agreed at the
Digital North Lanarkshire PoW Board: 
a) % increase in employees/learners identifying as digitally confident;
b) % increase in number of learners using a tool to assess their skills and
agreeing/strongly agreeing on the competence level of their skills;
c) % increase in number of employees accessing/attending digital training. 
3.2 Performance indicator definitions are complete and methods of data gathering are
currently being investigated.     
4. Supporting documentation 
Appendix One – Culture Change Roadmap illustration.   
Stephen Llewellyn
Chief Officer (Housing)  
Page 20 of 218

Page 21

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 21 of 218

Page 22

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 22 of 218

Page 23

Appendix 1 
Page 23 of 218

Page 24

Page 24 of 218

Page 25

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref   Date 20/11/24 
Strategic Performance Framework - latest performance results for
Finance 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail KempE@northlan.gov.uk Telephone 01698 302408 
Executive Summary
This report has been prepared in line with the Council’s Strategic Performance Framework
and enables progress against strategic priorities and day to day operations to be regularly
reported to service committees to support Elected Members in their role of monitoring and
scrutinising service performance. This can support the identification of areas requiring
further investigation or improvement. 
The report represents the six-monthly Performance Review for Finance across a range of
measures. The Service continues to deal with demand pressures and additional workloads
as a result of the cost-of-living crisis, however performance continues to be strong across
a number of areas including Council Tax collection. 
There are, however, areas where performance is lower than expected, including with
Creditors and benefit processing times. The service has action plans in place to improve
performance in these areas.  
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Review the high-level performance overview presented in Appendix 1, and the
supporting data contained within the linked Excel spreadsheet and identify where
further information is required to understand or investigate performance further. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (21) Continue to identify and access opportunities to leverage
additional resources to support our ambitions
Programme of Work Statutory / corporate / service requirement
Item 4
Page 25 of 218

Page 26

1. Background 
1.1 There are six inter-related strategic frameworks which are key to
evaluating the success of The Plan for North Lanarkshire and
assessing delivery towards achieving the overall vision by ensuring
each stage is appropriately aligned, planned, guided, implemented,
monitored, and governed.   
1.2 The six frameworks focus on ensuring a corporate one council
approach in respect of Policy, Governance, Performance, Self-Evaluation, Project
Management, and Demonstrating Improved Outcomes for Communities.   
1.3 The Strategic Performance Framework comprises performance measurement at three
levels (as per the diagram on the right).  This aims to collectively provide an overview
of performance to help understand the impact of council activities on improving services
and outcomes for the people and communities of North Lanarkshire.  The measures in
this Framework allow for day to day activities, and progress towards achieving the long-
term vision set out in The Plan for North Lanarkshire, to be regularly monitored,
reported, assessed, and scrutinised.   
1.4 The Strategic Performance Framework is aligned to the Accounts Commission’
Statutory Direction which places a requirement on councils to report a range of
information in terms of (1) improving local services and outcomes, and (2)
demonstrating Best Value.  Key points of note in this respect are that the Accounts
Commission also expect to see: 
(a) A balance in terms of reporting that captures highlights of good performance as
well as areas of performance requiring improvement.
(b) Reporting that is undertaken in a timely manner.
(c) Easy access to performance information for all citizens and communities.
(d) Comparisons of performance (i) over time (e.g. compared to previous years), and
(ii) with others (e.g. other local authorities or the national average (where available
and appropriate). 
1.5 The council’s comparative performance in Local Government Benchmarking 
Framework (LGBF) indicators can be viewed through the Improvement Service’s online 
dashboard: https://www.improvementservice.org.uk/benchmarking/explore-the-data   
1.6  A Performance Reporting Schedule supports the timely submission of a range of 
performance information to ensure fully informed review, reporting, scrutiny, and 
decision making processes by Elected Members and senior management.  This 
Schedule, endorsed by the Audit and Scrutiny Panel in February 2024, includes Chief 
Officer’s individual Performance Reviews at Service Committees in line with the 
Strategic Performance Framework. 
1.7  This report therefore presents the Finance and Resources Committee with the latest 
performance results for Finance for Members’ further review and scrutiny. 
2. Strategic Performance Framework 
Finance and Resources Committee responsibilities 
2.1 In line with the terms of reference outlined in the Scheme of Administration, the Finance
and Resources Committee is responsible for monitoring and reviewing performance
information for the following Ambition Statements from The Plan for North Lanarkshire.  
Page 26 of 218

Page 27

21.  Continue to identify and access opportunities to leverage additional resources to
support our ambitions. 
2.2 The high-level performance overview in Appendix 1 presents Members with a summary
of the latest results for each performance indicator within the remit of the Chief Officer
(Finance). 
2.3 The information in Appendix 1 comprises the undernoted. Appendix 2 provides
additional context in respect of the council’s approach to the measurement of indicators
and setting of targets. 
• An ideal direction arrow - this indicates whether a higher or lower figure is the
preferred direction of travel.   
• Measurement unit - for example whether the result is a %, a number, a unit cost
(in £), or a ratio.
• Performance results for the most recent financial years (depending on availability
of data) along with the latest year’s target and corresponding RAG status (for
indicators where it is appropriate to set targets).   
• The most recent monthly or quarterly results, along with the corresponding target
and RAG status.  Note the inclusion of this information is dependent on the
measurement frequency of the indicator and availability of data as at the time of
reporting. 
• A trend graph - this captures the direction of travel achieved over the years and
includes the most recent monthly or quarterly results where available.
• Comments - narrative summarising the current position and providing an
explanation for any significant variations in performance.  Where applicable, this
narrative also highlights any internal or external factors impacting on service
delivery as well as any residual effects of the pandemic, e.g. any increase or
decrease in the volume of transactions or enquiries processed. 
2.4 A large volume of data supports the high-level performance overview in Appendix 1. 
This is outlined in the latest performance results for Finance Excel spreadsheet
which is available through the following link for Members to carry out a deep dive and
review and scrutinise each performance indicator further.  The Menu on the second tab
of the spreadsheet contains built in hyperlinks that automatically take the user to a tab
for each performance indicator and therefore provides a useful navigation aid to review
the contents of the file.
• Latest performance results for Finance.xlsx 
Current context 
2.5 The Finance restructure implemented from April 2022 aimed to support greater
resilience and effectiveness which has helped the service improve performance across
a number of areas. However, during 2024/25 the service continues to experience
increasing demand for services such as Scottish Welfare Fund and other benefit
applications as the cost of living crisis continues. 
 A higher figure is better
 A lower figure is better
Key to RAG status
Green Performance is on target and/or within acceptable thresholds
Red Performance does not meet target and is outwith acceptable thresholds
Blue Performance surpasses the target and exceeds expectations
Page 27 of 218

Page 28

Recent Performance highlights 
2.6 The service continues to demonstrate positive trends across cost measures including
improvements in the cost of the closure of the annual accounts and the cost of collecting
Council Tax and cost per case for Housing Benefits and Council Tax. These
improvements are largely as a result of the service’s ability to absorb additional
demand. 
2.7 The collection rate for Non Domestic Rates improved for the third year in a row following
a significant dip in performance linked to the economic impact of the Covid pandemic. 
2.8 The Council has witnessed an increase in the proportion of residents choosing to pay
their Council Tax by Direct Debit which is an important measure as the Council looks
to increase collection and reduce the costs of administering Council Tax. 
2.9 While the number of invoices processed within 30 days is still performing below target,
significant work by the Service during 2023/24 both with internal efficiency and
improving the performance of other services has seen the measure improve from
76.0% in 2022/23 to 92.0% in 2023/24. 
Areas of performance requiring improvement 
2.10 The Service continues to progress initiatives to improve Council Tax collection which
includes incentivising payment by Direct Debit, improving uptake of the online portal
and, alongside the Sheriff Officers and colleagues in Legal and Democratic, reviewing
long-standing Council Tax debts. 
2.11 During 2023/24 there were dips in performance within the team in managing the
administration of benefit and Scottish Welfare Fund applications within the timescales
included in the performance measures. The service has worked during 2023/24 and
during 2024/25 to build additional resilience into the teams and to increase the pace of
automation of tasks to ensure that the volume and complexity of claims can continue
to be managed within the resources available to the service. 
Next steps 
2.12 As noted in paragraph 1.6, the Strategic Performance Framework is supported by a
Performance Reporting Schedule.  This sets out the arrangements for service,
statutory, and Strategic Performance Framework reporting to committee.  In this
respect the relevant Committee can expect to receive the following in respect of
Finance areas of work for 2024 to 2025. 
Report Description Committee Committee
cycle
Revenues and
benefit update
report
This report provides an update on the
payment performance for council tax and
non-domestic rates and the administration
of welfare benefits and Council Tax
Reduction Scheme,
Finance and
Resources
Committee
Each cycle
Treasury
Management
annual activity
report
This report fulfils the key requirements of
the council’s reporting procedures for
Treasury Management in accordance with
the CIPFA Code of Practice on Treasury
Management and the CIPFA Prudential
Code for Capital Finance in Local
Authorities and reports on the council’s
Finance and
Resources
Committee
Cycle 3 of
2024
Page 28 of 218

Page 29

performance in complying with the
mandatory prudential indicators,
Financial
monitoring
report –
council
summary
(revenue)
This report presents the council’s revenue
monitoring position for the General Fund
Account, Housing Revenue Account, and
Adult Health and Social Care
Finance and
Resources
Committee
Each cycle
Financial
monitoring
report –
council
summary
(capital)
This report presents the council’s capital
monitoring position for the council’s capital
programmes, including general services,
housing revenue account, City Deal, etc.
Finance and
Resources
Committee
Each cycle
Financial
monitoring -
savings
This report provides an update on the
achievement of the three-year financial
savings targets and progress in
implementing one -off investment priorities. 
Finance and
Resources
Committee
6-monthly
Annual
accounts
The Local Authority Accounts (Scotland)
Regulations 2014 require the council to
prepare an annual Statement of Accounts
in accordance with proper accounting
practices. These regulations also required
that, as a committee of the authority whose
remit includes audit or governance
functions, the Audit and Scrutiny Panel
meet to consider the audited annual
accounts with the aim to approve these for
signature no later than 30th September,
and to publish these by 31st October
immediately following the financial year to
which they relate. 
Audit and
Scrutiny
Panel
Cycle 2 in
2024
(unaudited
accounts)
Cycle 3 in
2024
(audited
accounts) 
3. Measures of success 
3.1  Measures of success include:
• Regular oversight and monitoring of performance across the organisation to gain
assurances in terms of governance and accountability.
• Regular review and challenge processes to scrutinise the performance of the
council to ensure effective use of resources and that resources are directed in
accordance with agreed policy and according to priorities, while ensuring sound
decision making and clear accountability for the use of resources in achieving
improved outcomes for service users and the local community.  
• Performance monitoring, management, and reporting arrangements that support
the demonstration of improved performance in local services and outcomes, and
the delivery of Best Value. 
4. Supporting documentation 
Appendix 1 -  High-level performance overview 
Appendix 2 - Note for information in respect of performance indicators and targets. 
Elaine Kemp
Chief Officer (Finance) 
Page 29 of 218

Page 30

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
Page 30 of 218

Page 31

5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 31 of 218

Page 32

Appendix 1
Finance
High-level performance overview - as at September 2024. 
Page 32 of 218

Page 33

Page 33 of 218

Page 34

Page 34 of 218

Page 35

Page 35 of 218

Page 36

Appendix 2 
Note for information in respect of performance indicators and targets 
It should be noted that the nature of particular areas of service being measured in order to assess and manage performance do not always lend
themselves to a traditional approach to either measuring performance or setting targets, for example: 
• Some indicators (and targets) are required to monitor performance against a commitment or minimum standard the council has made in
advance to achieve a stated level of performance when delivering a service. 
• Some indicators (and targets) are required to assess compliance with legislative requirements.
• Some targets represent the level of performance that the council aims to achieve from a particular activity in either the short, medium, or
long-term.
• Some indicators are needed to help present a complete picture of performance in the round, as a single performance indicator used in
isolation rarely tells the whole performance story and a range of indicators are required to reflect the economic, efficient, and effective
aspects of demonstrating best value. 
• Some indicators and targets can help to support accountability to the public in terms of demonstrating best value and an efficient and
effective approach to the delivery of services. 
• Some indicators are monitored to ensure the council complies with specific requirements, such as information governance or health and
safety.
• Some indicators are monitored to provide added context in order to help interpret performance results or supplement other existing
measures. Information such as this can be critical to enhance knowledge and decision making in terms of demand to help determine
priorities and allocate resources. 
• For some indicators it is not appropriate to set targets as it is the trend in the data (i.e. the direction of travel) that provides more meaningful
information to allow for an assessment in relation to whether performance has improved.
• Some indicators are national benchmarking indicators where their purpose is to allow for comparisons with other councils and the national
average.  These benchmarks are, in essence, can openers designed to focus questions on why variations in cost and performance are
occurring between similar councils.
• Some indicators are proxy measures, particularly in the case of measuring outcomes, as without directly measurable data for a desired
outcome the only alternative is to use a proxy that is an indirect measure of the desired outcome but which is itself strongly correlated to that
outcome. 
Page 36 of 218

Page 37

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref  JMcK Date 20/11/24 
Strategic Performance Framework - latest performance results for
Assets and Procurement 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail MckinstryJ@northlan.gov.uk Telephone 07939 281102 
Executive Summary
Assets and Procurement sits within the Enterprise and Communities service area of the
council and comprises the following areas – asset management, estates management,
enterprise project, forward planning and specification, town and community hub
development programme, technical and design, procurement and support, and corporate
property. 
The teams play a key role in leading and developing on a number of key areas that support
the delivery of the place based ambition set out in The Plan for North Lanarkshire.  This
includes the strategic commercial partnership for the enterprise project, asset
rationalisation and development, the corporate asset management plan, the hub
development and delivery programme, climate change – committing to net zero, and
improving procurement capability and capacity. 
The work carried out by the teams also supports the delivery of a number of other key
areas across the council such as the new supply programme, economic regeneration
delivery plan, planning and place making, city deal, the early learning and childcare
expansion programme, additional support needs provision, and the leadership and
operating model for the hubs. 
Performance is measured across many of the above service areas and is monitored by the
service’s management team as well as within operational teams.  This report provides an
update of current performance reflecting the service’s key areas of activity. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Review the high-level performance overview presented in Appendix 1, and the
supporting data contained within the linked Excel spreadsheet, and identify where
further information is required to understand or investigate performance further. 
Item 5
Page 37 of 218

Page 38

1. Background 
1.1 There are six inter-related strategic frameworks which are key to evaluating the
success of The Plan for North Lanarkshire and assessing delivery towards achieving
the overall vision by ensuring each stage is appropriately aligned, planned, guided,
implemented, monitored, and governed.   
1.2 The six frameworks focus on ensuring a corporate one council approach in respect of
Policy, Governance, Performance, Self-Evaluation, Project Management, and
Demonstrating Improved Outcomes for Communities.   
1.3 The Strategic Performance Framework comprises performance measurement at three
levels (as per the diagram on the right).  This aims to collectively provide an overview
of performance to help understand the impact of council activities on improving services
and outcomes for the people and communities of North Lanarkshire.  The measures in
this Framework allow for day to day activities, and progress towards achieving the long-
term vision set out in The Plan for North Lanarkshire, to be regularly monitored,
reported, assessed, and scrutinised.   
1.4 The Strategic Performance Framework is aligned to the Accounts Commission’
Statutory Direction which places a requirement on councils to report a range of
information in terms of (1) improving local services and
outcomes, and (2) demonstrating Best Value.  Key points of
note in this respect are that the Accounts Commission also
expect to see: 
(a) A balance in terms of reporting that captures highlights of
good performance as well as areas of performance
requiring improvement.
(b) Reporting that is undertaken in a timely manner.
(c) Easy access to performance information for all citizens and communities.
(d) Comparisons of performance (i) over time (e.g. compared to previous years), and
(ii) with others (e.g. other local authorities or the national average (where available
and appropriate). 
1.5 The council’s comparative performance in Local Government Benchmarking 
Framework (LGBF) indicators can be viewed through the Improvement Service’s online 
dashboard: https://www.improvementservice.org.uk/benchmarking/explore-the-data   
1.6  A Performance Reporting Schedule supports the timely submission of a range of 
performance information to ensure fully informed review, reporting, scrutiny, and 
decision making processes by Elected Members and senior management.  This 
Schedule, endorsed by the Audit and Scrutiny Panel in February 2024, includes Chief 
Officer’s individual Performance Reviews at Service Committees in line with the 
Strategic Performance Framework. 
1.7  This report therefore presents the Finance and Resources Committee with the latest
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Page 38 of 218

Page 39

performance results for Assets and Procurement for Members’ further review and 
scrutiny. 
2. Strategic Performance Framework 
Finance and Resources Committee responsibilities 
2.1 In line with the terms of reference outlined in the Scheme of Administration, the Finance
and Resources Committee is responsible for monitoring and reviewing performance
information for the following Ambition Statements from The Plan for North Lanarkshire.   
21. Continue to identify and access opportunities to leverage additional resources to
support our ambitions.
22. Facilitate a North Lanarkshire wide approach to asset rationalisation, including with
communities and partners. 
2.2 The high-level performance overview in Appendix 1 presents Members with a summary
of the latest results for each performance indicator within the remit of the Chief Officer
(Assets and Procurement). 
2.3 The information in Appendix 1 comprises the undernoted. Appendix 2 provides
additional context in respect of the council’s approach to the measurement of indicators
and setting of targets.
• Ideal direction text - this indicates whether a higher or lower figure is the preferred
direction of travel.  
• Measurement unit - for example whether the result is a %, a number, a unit cost
(in £), or a ratio.
• Performance results for the most recent financial years (depending on availability
of data) along with the latest year’s target and corresponding RAG status (for
indicators where it is appropriate to set targets).   
• The most recent monthly or quarterly results, along with the corresponding target
and RAG status.  Note the inclusion of this information is dependent on the
measurement frequency of the indicator and availability of data as at the time of
reporting. 
• A trend graph - this captures the direction of travel achieved over the years and
includes the most recent monthly or quarterly results where available.
• Comments - narrative summarising the current position and providing an
explanation for any significant variations in performance.  Where applicable, this
narrative also highlights any internal or external factors impacting on service
delivery as well as any residual effects of the pandemic, e.g. any increase or
decrease in the volume of transactions or enquiries processed. 
2.4 A large volume of data supports the high-level performance overview in Appendix 1. 
This is outlined in the latest performance results for Assets and Procurement Excel
spreadsheet which is available through the following link for Members to carry out a
deep dive and review and scrutinise each performance indicator further.  The Menu on
the second tab of the spreadsheet contains built in hyperlinks that automatically take
the user to a tab for each performance indicator and therefore provides a useful
navigation aid to review the contents of the file.
• Latest performance results for Assets and Procurement.xlsx
Key to RAG status
Green Performance is on target and/or within acceptable thresholds
Red Performance does not meet target and is outwith acceptable thresholds
Blue Performance surpasses the target and exceeds expectations
Page 39 of 218

Page 40

Current context 
2.5 Assets and Procurement continue to support management teams as they continue to
adopt more agile and hybrid modes of operation.  Whilst continuing to deliver at pace,
the hub programme continues to experience significant cost increases linked to global
and national influences and given the size and scale of spend linked to this programme
– any increases are significant. The service continues to lead on the council response
to climate change duties.  The council have a largely decentralised procurement model,
in which the Corporate Procurement Team (CPT) provide the strategic governance
through GCSOs and provide professional expertise through officers that lead or support
regulated procurement activity. CPT continue to be responsible for consolidating the
council’s Annual Procurement report (which is a legislative requirement), managing the
council’s contract register of external expenditure, and providing organisational
procurement reporting.  The overall procurement function of the council is assessed
regularly by a third party agency through procurement capability assessments (PCIP)
for which CPT is leading an internal procurement plan.  The most recent assessment
was carried out in 2024 and is reported separately to this committee. 
2.6 As part of the council’s Programme of Work governance structure, Assets and 
Procurement are heavily involved in the following Programmes of Work: - 
• Transforming Places;
• Invest in North Lanarkshire;
• Sustainable Futures;
• Digital North Lanarkshire, and
• One Service 
Recent Performance highlights 
2.7  Within the area of corporate procurement, the vast majority of indicators are positive,
with some notable areas being the council continuing to ensure 100% performance in
areas such as: ensuring those contracts which exceed £1m include community benefit
requirements; and ensuring all qualifying contracts are awarded to those who meet fair
work criteria.  In addition, the service is exceeding targets around the percentage of
contracts that are awarded to SMEs.  In the current financial year an update an updated
positive PCIP assessment was conducted. 
2.8 In addition, since the last report to Committee, the £22m state-of-the-art Chryston 
Community Hub, which is home to Chryston Primary School and the new Community 
Health Clinic for NHS Lanarkshire has officially opened. Approval has also been 
secured for an extension to Chryston High School and the development of a new St 
Stephen’s Community in Sikeside to address capacity issues in the existing school 
estate and to enhance community facilities in the area and, the development of a new 
Gartcosh Community Hub to address capacity issues in the existing school estate, all 
three developments are expected to go to site in early 2025 . Both the Orbiston 
Community Hub and St Kevins Community Hub are now on site, with both projects 
reporting that construction works are currently on programme.  Against challenging 
budget settlements, we continue to manage our maintenance budgets pragmatically. 
Areas of performance requiring improvement 
2.9  Within procurement one measure has fallen short of the expected target range, which 
relates to the performance in relation to the award of qualifying contracts to local 
organisations within the reporting period. It should be noted that cyclical renewals will 
result in fluctuation in year-on-year percentages across measures when multi-year
Page 40 of 218

Page 41

contracts are awarded due to the nature of the Framework Agreement award process. 
Across all of the reporting periods, performance ranges from 40% to 72% as a result 
of this.  The service is currently reviewing the data around this area to establish whether 
the cyclical nature of contract awards requires to be reflected in the measure.   
2.10 The two indicators linked to occupancy levels in schools continue to be lower than the
agreed target. As detailed within previous reports, whilst the service continues to look
for other uses for under occupied schools, it is preferred that any given school is under
capacity than over capacity.  In line with our SARIS programme, where opportunity
exists we may look at alternative usage for spare capacity. 
2.11 Significant work continues to be progressed for office accommodation in order that
services can operate in an agile and digital manner to ensure that our office estate is
adaptable in this regard. 
2.12 Within commercial properties ongoing changes in the external economic environment
is affecting the mix of properties being let whilst income levels continue to remain high
and the financial performance of North Lanarkshire Properties remains high. 
Next steps 
2.13 As noted in paragraph 1.6, the Strategic Performance Framework is supported by a 
Performance Reporting Schedule.  This sets out the arrangements for service, 
statutory, and Strategic Performance Framework reporting to committee.  In this 
respect the relevant Committee can expect to receive the following in respect of Assets 
and Procurement areas of work for 2024 to 2025. 
Report Description Committee Committee
cycle
Public Sector
Duties Climate
Change
annual report
As part of the climate change duties, the
council is required to complete an annual
submission to demonstrate that as a public
sector organisation it is contributing to the
nationally set climate change targets as
well as adhering to its other responsibilities
in terms of both adaptation and
sustainability. 
• Latest report in February 2024:
Document.ashx (cmis.uk.com)
Environment
and Climate
Change
Committee
Cycle 1 in
2025
Annual
procurement
report
This report discharges the council’s duties
in terms of the Procurement Reform
(Scotland) Act 2014, to prepare an annual
report on its regulated procurement
activities.
• Latest report in September 2024:
Document.ashx (cmis.uk.com)
Finance and
Resources
Committee
Cycle 3 in
2025
North
Lanarkshire
Properties
NLP LLP is a limited liability partnership
established in 2013 between the council
and its wholly owned company, North
Lanarkshire Property Investments Ltd.  NLP
LLP undertakes the marketing, leasing, and
management of the council’s commercial
property portfolio (shop units, office
accommodation, business centres,
industrial yards, and storage units) and, on
behalf of the Council, manages legacy
properties which remain in the council’s
Finance and
Resources
Committee
Cycles 2
and 4 in
2025
Page 41 of 218

Page 42

investment property portfolio.  It also
delivers services in relation to externally
owned properties that the council leases for
its own operational use and provides
general advice on lease transactions.  A
six-monthly report provides a performance
and finance update to Committee:
• Latest report in May 2024:
Document.ashx (cmis.uk.com) 
3. Measures of success 
3.1  Measures of success include: 
• Regular oversight and monitoring of performance across the organisation to gain
assurances in terms of governance and accountability.
• Regular review and challenge processes to scrutinise the performance of the
council to ensure effective use of resources and that resources are directed in
accordance with agreed policy and according to priorities, while ensuring sound
decision making and clear accountability for the use of resources in achieving
improved outcomes for service users and the local community.  
• Performance monitoring, management, and reporting arrangements that support
the demonstration of improved performance in local services and outcomes, and
the delivery of Best Value. 
4. Supporting documentation 
Appendix 1 -  High-level performance overview 
Appendix 2 - Note for information in respect of performance indicators and targets. 
James McKinstry
Chief Officer (Assets and Procurement) 
Page 42 of 218

Page 43

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
Page 43 of 218

Page 44

5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
Managing and monitoring service performance supports the ongoing monitoring the
service’s risk register. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 44 of 218

Page 45

Appendix 1
Assets and Procurement
High-level performance overview - as at September 2024 
Page 45 of 218

Page 46

Page 46 of 218

Page 47

Page 47 of 218

Page 48

Appendix 2 
Note for information in respect of performance indicators and targets 
It should be noted that the nature of particular areas of service being measured in order to assess and manage performance do not always lend
themselves to a traditional approach to either measuring performance or setting targets, for example: 
• Some indicators (and targets) are required to monitor performance against a commitment or minimum standard the council has made in
advance to achieve a stated level of performance when delivering a service. 
• Some indicators (and targets) are required to assess compliance with legislative requirements.
• Some targets represent the level of performance that the council aims to achieve from a particular activity in either the short, medium, or
long-term.
• Some indicators are needed to help present a complete picture of performance in the round, as a single performance indicator used in
isolation rarely tells the whole performance story and a range of indicators are required to reflect the economic, efficient, and effective
aspects of demonstrating best value. 
• Some indicators and targets can help to support accountability to the public in terms of demonstrating best value and an efficient and
effective approach to the delivery of services. 
• Some indicators are monitored to ensure the council complies with specific requirements, such as information governance or health and
safety.
• Some indicators are monitored to provide added context in order to help interpret performance results or supplement other existing
measures. Information such as this can be critical to enhance knowledge and decision making in terms of demand to help determine
priorities and allocate resources. 
• For some indicators it is not appropriate to set targets as it is the trend in the data (i.e. the direction of travel) that provides more meaningful
information to allow for an assessment in relation to whether performance has improved.
• Some indicators are national benchmarking indicators where their purpose is to allow for comparisons with other councils and the national
average.  These benchmarks are, in essence, can openers designed to focus questions on why variations in cost and performance are
occurring between similar councils.
• Some indicators are proxy measures, particularly in the case of measuring outcomes, as without directly measurable data for a desired
outcome the only alternative is to use a proxy that is an indirect measure of the desired outcome but which is itself strongly correlated to that
outcome. 
Page 48 of 218

Page 49

North Lanarkshire Council  
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    NLP/IM/JMcK Date 20/11/24 
North Lanarkshire Properties LLP – Performance Indicators: 1
April to 30 September 2024 and Financial Performance as at 19th
July 2024 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail martini@northlan.gov.uk Telephone Ian Martin
Tel: 07966 397637 
Executive Summary
This report provides details of North Lanarkshire Properties LLP’s (NLP LLP) performance
from 1 April 2024 to 30 September 2024 (Q1&Q2) and provides an update on significant
events and service delivery highlights during the reporting period. 
The report also provides details of the financial performance for the period from 1st April
2024 to 19th July 2024. 
Recommendations
It is recommended that the Finance and Resources Committee: 
1. Acknowledges NLP LLP’s operational performance against its 2024/25 targets for
the period 1 April 2024 to 30 September 2024; 
2. Acknowledges NLP LLP’s financial performance during the period from 1 April 2023
to 19th July 2024. 
3. Acknowledges the ongoing work to review NLP LLP and that a future report
detailing the outcome will be presented to a future meeting of the Policy and
Strategy Committee. 
4. Acknowledges the Service delivery highlights detailed within the report.  
The Plan for North Lanarkshire
Priority  Improve economic opportunities and outcomes
Ambition statement (3) Maximise the use of our marketable land and assets through
improved development in business and industrial infrastructure
Programme of Work Transforming Places
Item 6
Page 49 of 218

Page 50

1. Background 
1.1 NLP LLP is a limited liability partnership established in 2013 between the Council and
its wholly owned company, North Lanarkshire Property Investments Ltd. It undertakes
the marketing, leasing and management of the Council’s commercial property portfolio
(shop units, office accommodation, business centres, industrial yards and storage
units) and, on behalf of the Council, manages legacy properties which remain in the
Council’s investment property portfolio. It also delivers services in relation to externally
owned properties that the Council leases for its own operational use and provides
general advice on lease transactions. 
1.2 Governance, strategic direction and oversight of the limited liability partnership is
provided by the Management Committee which comprises four elected members and
one senior Council officer appointed by the Council and one member appointed by the
limited company, NL Property Investments Ltd. Members to the Board of Directors of
the limited company, NL Property Investments Ltd, are also appointed by the Council
with five elected members and one senior officer appointed. The Management
Committee meets quarterly and is responsible for ensuring NLP LLP’s services are
delivered in accordance with the approved Service Level Agreement and company
objectives. 
1.3 The Management Committee undertook a number of measures to implement
recommendations from the ALEO review completed in 2018/19, most significantly, the
establishment restructure and enhancement proposals approved in February 2019. 
1.4 A further review of ALEO’s is being undertaken with a future report being presented to
the Policy and Strategy Committee for consideration on completion of this review.   
2. Report 
Performance Indicators 
2.1 Following changes to the council’s Scheme of Administration, responsibility for
oversight of service delivery by arm’s length bodies now rests with the relevant service
committee. The functions delivered by NLP LLP on behalf of the council fall within the
Terms of Reference of this committee and a six monthly performance report is
submitted in line with the Strategic Performance Framework considered by members
in November 2019. The report will confirm where NLP LLP is fulfilling its contractual
obligations and meeting the council’s service delivery expectations, as well as providing
information from Finance on financial performance and overall financial standing within
the company. This information will help give early warning of any financial risks which
may give rise to operational or reputational risks for the council. 
2.2 2024/25 Performance indicators are listed at appendix 1 along with actual performance
for the period 1 April 2024 to 30 September 2024, which fulfil the reporting requirements
agreed between the organisation and the council and further demonstrate where NLP
LLP is contributing to the council’s strategic priorities. 
2.3 During the reporting period a total of 14 properties were let, renewed or assigned (1
Office; 0 Retail and 13 Industrial) and there were 21 lease terminations over the
corresponding period.   
Page 50 of 218

Page 51

2.4 The percentage of vacant properties across the NLP portfolio over the corresponding
period are shown at Section 12 in Appendix 1 however due to new reporting periods
being established to simplify the process, there is no comparison to previous periods. 
Service Delivery Highlights 
2.5 NLP have partnered with NLP Growth Team to develop the existing Braidhurst
Industrial Site in Motherwell where the development value is estimated to be in the
region of £6.5m.  Funding of £1.9m has been secured from the Scottish Government
Regeneration Capital Grant Fund (RCGF) and a further £1.3m from Place Based
Investment Programme (PBIP) for the construction of around 10 incubator units to bring
and support small to medium sized local businesses.  The project is being jointly funded
by NLC and NLP where NLP has committed to provide up to 10% of the project value
capped at a maximum of £600,000.  NLC have also committed to provide £2.8m
towards the project. The project will also include the upgrading to the existing industrial
units within the site and forms part of a larger project with the formation of a transport
link at nearby Newhut Road and Bellshill Road. The contractor has now taken
possession of the site and it is anticipated that works will be completed in December 
2024.
2.6 The Orrs building development in Airdrie is now complete and work is progressing to
transfer the two ground floor retail units to NLP.  This will provide increased retail
provision within Airdrie and support the wider regeneration of the town centre. 
2.7 NLP is actively supporting the Council’s Ambition Plan for Town Centre regeneration.
This has taken the form of identifying properties which could be converted to residential
use in Motherwell and Airdrie and which can be sold to the Council to further its plans. 
ALEO Review 
2.8 The 2024/25 Budget Motion approved by Council on 15 February 2024 included a
recommendation to ‘Review the functions and strategic direction of the Council’s
remaining ALEOs (Routes to Work, Fusion Assets and North Lanarkshire Properties)
to ensure that they continue to contribute to the delivery of the Council’s strategic
priorities.’ 
2.9 In addition, the Audit and Scrutiny Panel on 26 February 2024 agreed that that a refresh
of the ALEO Review Programme is undertaken during 2024/25 and 2025/26 and noted
that the findings from these Client Service led reviews will be reported to future
meetings of the Policy and Strategy Committee in due course and in line with the
council’s Scheme of Administration. 
2.10 A single Board has been established to oversee the review of all three ALEOs with
ALEO specific sub-groups led by the Client Service created to carry out the specific
review tasks linked to their individual ALEO. NLP LLP’s review is being led by Assets
and Procurement. 
Page 51 of 218

Page 52

Financial Impact 
Public Accountability Obligations – Financial year 2024/25 
2.11 To satisfy the Council’s duty to ensure the organisation delivering property
management services on its behalf is financially sound, the Council’s Section 95 Officer
maintains appropriate and proportionate processes and procedures for scrutinising
NLP LLP’s financial performance. 
2.12 The Council’s Legal Agreements with NLP LLP specify the financial information which 
NLP must submit to the Council including an annual business plan, quarterly 
management accounts, audited financial statements etc., to enable Financial Solutions 
to assess and report any financial risk likely to arise as a result of the Council using 
NLP LLP to deliver these services. 
2.13 The Council expends revenue resources annually with NLP LLP to deliver services 
which assist the Council in achieving its priority outcomes. The Council has a duty to 
continue to ensure this money is being properly used to deliver both the Council’s and 
NLP LLP’s key objectives. 
2.14 For financial year 2024/25, the Council’s approved revenue spend includes property
management services (£0.198m) and rental charges for properties utilised by the
Council. 
Financial Outturn to 31 March 2024 
2.15 The 2023/24 Annual Financial Statements approved by the Board at the AGM on 17
September 2024 reported an Accounting Profit for the year of £1.200m, which included
increased costs within Property Costs, Financing Costs, FRS102 pension costs and a
small loss on revaluation of assets partially offset by an over-recovery in income
relating to bank interest coupled with underspends within Employee and Admin Costs. 
Further details on financial trading performance are given on Appendix 2. 
2.16   Appendix 3 provides Balance Sheet balances at the 31 March 2024 along with the
previous year’s comparative figures and commentary.  Council representatives are
asked to note net assets totalling £48.905m are predominately due to improved timing
in payment of invoices, receipt of income and the refinancing of loan during the year. 
Therefore, Council representatives should be assured that the company is in a healthy
position. 
Financial Performance 1 April 2024 to 19 July 2024 
2.17 Based on the financial performance 19 July 2024 a projected transfer into reserves of
£0.420m (following loan repayments) is reported to 31 March 2025 which is a break-
even position against budget.  The position reflects increased income relating to bank
interest, offset by higher than anticipated financing costs and costs for repairs. As at
period 4 the Actual Debt Service Covenant (ADSC) is 1.57:1 which is in excess of the
revised ratio agreed with Barclays for of 1.1:1.  Further details on financial performance
are given in Appendix 4. 
2.18 Appendix 5 provides Balance Sheet balances as at 19 July 2024 along with the
comparative figures as at 31 March 2024.  The company has net assets of £50.277m
predominately due to realisation of year end prepaid income in the accounts and
improved timing in payment of invoices and receipt of bank interest offset by Trade
Debtors.  This is a favourable movement of £1.372m on the year-end position.
Page 52 of 218

Page 53

Members should be assured that the company has sufficient resources to meet its
current obligations. 
Projected Cashflow to June 2025 
2.19  Appendix 6 provides the projected cashflow to 30 June 2025. The minimum balance of
cash projected to be held was £5.898m in February 2025. This demonstrates that NLP
will continue to hold sufficient levels of cash. 
2.20 NLC continue to monitor NLP financial performance closely with updates provided to 
the Corporate Management Team. 
3. Measures of success 
3.1 The financial position of the company is being monitored closely to ensure that NLP
LLP will continue to meet its loan obligations. 
3.2 The re-development of Braidhurst Industrial Estate will provide new and refurbished
industrial units for let, supporting new and expanding business and contributing to the
overall vision for the area. 
3.2  The transfer of the retail units as part of the Orrs building redevelopment will assist in
the regeneration of Airdrie town centre.   
4. Supporting documentation  
Appendix 1
Appendix 2
Appendix 3     
Appendix 4
Appendix 5
Appendix 6
Performance Update –  1 April 2024 to 30 September 2024.
Outturn to 31 March 2024
Overall Financial Standing – Balance Sheet as at 31st March 2024
Financial Performance to 19th July 2024
Overall Financial Standing – Balance Sheet as at 19th July 2024
Cashflow Forecast to June 2025 
James McKinstry
Chief Officer (Assets and Procurement) 
Page 53 of 218

Page 54

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The financial performance of NLP is closely monitored by the council’s Section 95
Officer and the financial performance along with other key financial information is
detailed within the report.   
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 54 of 218

Page 55

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐     
Page 55 of 218

Page 56

Page 56 of 218

Page 57

Page 57 of 218

Page 58

Page 58 of 218

Page 59

Page 59 of 218

Page 60

North Lanarkshire Properties LLP Appendix 2
Outturn to 31 March 2024
Income & expenditure 2023/24 2023/24 2023/24 Commentary
Annual
Budget
Actual 
Outturn  Variance
£m £m £m
Rental, SLA income and Insurance Income 6,404 6,681 277 Favourable variance due to proactive approach in relation
to rental income
Investment and other income 5 409 404 Predominately due to interest received
Total Income 6,409 7,090 681
Expenditure;
Employee costs -710 -566 144 Vacancies
Property Costs -2,132 -2,517 -385 Variance is a managed overspend within repairs.
Supplies & Services  & Admin Costs -694 -599 95 Favourable variance as a result of decreased bad debt
provision and marketing costs.
Financing Costs -1,817 -1,873 -56 Refinancing of loan - October 2024
Total Expenditure -5,353 -5,555 -202
Trading Profit 1,056 1,535 479
Year end Accounting adjustments not included in
budget (No Covenant impact):
Grant Income 0 0 0
FRS102 pension costs 0 -75 -75 Provided by Strathclyde Pension Office
Unrealised gain/(loss) on investment portfolio 0 -260 -260 Annual revaluation of property portfolio
Accounting Profit 1,056 1,200 144
Loan Principal Repayments -1,376 -872 0
Profit Transferred to/(out) Reserves -320 328 144
Page 60 of 218

Page 61

North Lanarkshire Properties LLP Appendix 3
Overall Financial Standing - Balance Sheet as at 31 March 2024
Balances/ Indicator As At 
31 March
2024
£m
As At 
31 March
2023
£m
Variance
£m
Commentary
Fixed Assets 73.946 74.206 (0.260) Revaluation of properties by BNP Parabis Ltd
Current Assets:
Trade Debtors 0.901 0.731 0.170 Improved timing re timing of payments
Bad Debt Provision (0.241) (0.222) (0.020) Minor movement
Prepayment and Other Debtors 0.000 0.000 0.000
Bank and short term investments 7.088 9.166 (2.078) Movement predominately attributable to the refinancing
of loan - approved capital payment.
7.748 9.675 (1.928)
Current Liabilities:
Creditors (2.049) (1.610) (0.438) Timing re processing of invoices and creditors payment
run
Other Creditors inc. VAT & other taxes (1.004) (0.879) (0.125) Prepaid income and loan interest
Loan payments due in <1 yr (0.500) (33.686) 33.186 Refinancing of loan - October 2024
(3.553) (36.176) 32.623
Net current Assets/(liabilities) 4.194 (26.501) 30.695
Loan repayments due in > 1 yr (29.235) 0.000 (29.235) Refinancing of loan - October 2024
Defined scheme pensions liabilities 0.000 0.000 0.000
Net Asset / (Liabilities) 48.905 47.705 1.200
Page 61 of 218

Page 62

North Lanarkshire Properties LLP Appendix 4
Year to date 19 July 2024
Income & expenditure 2024/25 2024/25 Year to date 2024/25 2024/25
Commentary:-
Annual Budget v Projected Outturn
Annual
Budget Budget Actual Variance
Projected 
Outturn Variance
£m £m £m £m £m £m
Rental, SLA income and Insurance Income 6.407 2.177 2.237 0.060 6.382 (0.025)
Forecast rental income mainly due to lower due
to investment works at Braidhurst Industrial
Estate
Investment and other income 0.095 0 0 0.022 0.268 0.173 Bank interest
Total Income 6.502 2.273 2.355 0.082 6.650 0.148
Expenditure;
Employee costs (0.769) (0.143) (0.141) 0.002 (0.758) 0.011 Underspend due to vacancies
Property Costs (2.109) (0.280) (0.356) (0.076) (2.222) (0.113) Variance is a managed overspend within repairs
Supplies & Services  & Admin Costs (0.713) (0.022) (0.022) (0.000) (0.713) 0.000
Financing Costs (1.991) (0.455) (0.463) (0.008) (2.037) (0.047) Based on updated forecasts for loan repayments
as part of the ongoing loan refinancing
Total Expenditure (5.582) (0.901) (0.983) (0.082) (5.730) (0.148)
Trading Profit 0.920 1.372 1.372 0.000 0.920 (0.000)
Loan Principal Repayments (0.500) (0.125) (0.125) 0.000 (0.500) 0.000
Profit Transferred to/(out) Reserves 0.420 1.247 1.247 0.000 0.420 (0.000)
Page 62 of 218

Page 63

North Lanarkshire Properties LLP Appendix 5
Overall Financial Standing - Balance Sheet as at 19 July 2024
Balances/ Indicator As at
19July 2024
As At 
31 March 2024
Variance Commentary
£m £m £m
Fixed Assets 73.946 73.946 0.000
Current Assets:
Trade Debtors 0.183 0.901 (0.718) Improved timing re payments received
Bad Debt Provision (0.241) (0.241) 0.000
Prepayment and Other Debtors 0.000 0.000 0.000
Bank and short term investments 7.215 7.088 0.128 Increased bank interest
7.157 7.748 (0.591)
Current Liabilities:
Creditors (0.719) (2.049) 1.330 Improved timing re processing of invoices
Other Creditors inc. VAT & other taxes (0.497) (1.004) 0.507 Year end prepaid income adjustments now
realised in the accounts
Loan payments due in <1 yr (0.500) (0.500) 0.000 Per loan repayment schedule
(1.716) (3.553) 1.837
Net current Assets/(liabilities) 5.441 4.194 1.247
Loan repayments due in > 1 yr (29.110) (29.235) 0.125
Defined scheme pensions liabilities 0.000 0.000 0.000
Net Asset / (Liabilities) 50.277 48.905 1.372
Page 63 of 218

Page 64

Appendix 6
5.4
5.6
5.8
6.0
6.2
6.4
6.6
6.8
7.0
Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25
Balance
-£m
NLP Cash Flow Forecast to June 2025
Page 64 of 218

Page 65

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    EK/KS/FC/DC Date 17/10/24 
Revenue Monitoring Report Council Summary
1 April 2024 to 13 September 2024 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail KempE@northlan.gov.uk Telephone 07939280601 
1. Background 
1.1 The Council’s approved Financial Regulations require services to remain within their
approved budgetary provision, and to report all significant deviations - defined as the
higher of £100,000 or 5% - within their budget monitoring reports.  Where significant
deviations are identified, services must provide explanatory commentary, outline the
Executive Summary
This report updates on the overall financial position for the General Fund Account, Housing
Revenue Account and Adult Health and Social Care, for the financial year to 31 March
2025.  The report consolidates the budget monitoring position of all Services, highlighting
and explaining major variances as per the Council’s approved Financial Regulations. 
The Council approved its General Fund Revenue Budget on 15 February 2024.  Following
notification from Scottish Government of further funding made available to local authorities
the overall budget is now £1,010.984m.  A Surplus of £3.595m is currently projected,
largely due to a net over recovery on loan charges and interest earned on revenue
balances.  This surplus is to support future budget challenges in accordance with the
approved reserves policy, and any budget smoothing strategy recommended by the S95
Officer. 
The 2024/25 budget incorporates £21.667m of net savings. It is projected that £20.245m
of the savings (93%) will be delivered within the financial year, with replacement savings
of £1.422m identified to fully address the shortfall.
Recommendations
It is recommended that the Finance and Resource Committee: 
(1) Acknowledge the financial position of the 2024/25 revenue budget; and
(2) Otherwise endorse the contents of this report. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 7
Page 65 of 218

Page 66

action required to rectify such deviations and where relevant, must also highlight the
impact this has on other budget headings. 
2. Report 
2.1 At its meeting of 15 February 2024, the Council approved a General Fund Revenue
Budget of £1,016.750m including expenditure budgets which will be offset by ring
fenced grant resources of £15.290m, resulting in a net expenditure position for
monitoring purposes of £1,001.460m.  Additional funding has since been confirmed as
part of the Scottish Government budget setting, resulting in an overall total budget of
£1,010.984m. 
2.2 Following the budget setting in February the Council has an approved savings target
of £21.667m for 2024/25.  Further detail can be found in Section 2.8 below. 
2.3 Table 1 below summarises the projected income and expenditure position, which
illustrates a projected surplus of £3.595m, which will be available to support future
budget challenges in accordance with the approved reserves policy, and any budget
smoothing strategy recommended by the S95 Officer. 
Annual 
Budget
(£m)
Projected
Outturn
(£m)
P6
Variance
(£m)
P4
Variance
(£m)
P4 to P6
Movement
(£m)
Expenditure     
Total Expenditure 1,010.984 1,007.389 3.595 - 3.595
Income     
Aggregate External Finance   836.439   836.439 - - -
Local Tax Collection   168.999   168.999 - - -
Use of Balance   5.546 5.546 - - -      
Total Income 1,010.984   1,010.984  - - -
Forecast Surplus/ (Deficit): to
support future budgets
- 3.595 3.595 - 3.595
Table 1
Analysis of Significant Variations
2.4 Table 2 below illustrates the projected outturn financial position of services:
Service P6 Outturn
(£m)
P4 Outturn
(£m)
P4 to P6
Movement
(£m)
Education, Children and Families - On Budget - On Budget -
Enterprise and Communities - On Budget - On Budget -
Chief Executives and Other
Corporate Services 0.595 Underspend - Underspend 0.595
Social Work (Non-Integrated) - On Budget - On Budget -
Executive Services Total 0.595 Underspend - On Budget 0.595
Financing Costs 3.000 Over recovery - On Budget 3.000
Forecast Surplus/ (deficit): to
support future budgets 3.595 Underspend - On Budget 3.595
Table 2
Page 66 of 218

Page 67

2.4 Education, Children and Families are reporting an overall breakeven position. 
However, it should be noted that there are a number of compensating variances within
this position. Underspends are projected within employee costs of £0.644m reflecting
actual and projected vacancies, along with the roll out of finalised HQ, cluster, and
school staffing structures.  An underspend of £0.176m is forecast in relation to
payments to other bodies reflecting the demand for family placement and external ASN
placements, and £0.195m in other expenditure linked to external grant synergies
aligned to music. These underspends are offset by a forecast under-recovery in income
of £0.501m in relation to reduced cross-boundary ASN placements within NLC settings,
an overspend within property costs of £0.257m due to increased utility costs within the
education estate, and an overspend in transport costs of £0.253m in relation to ‘Home
to School’ transport pressures as the service transitions to the new arrangements. 
2.5 Enterprise and Communities continue to report a projected breakeven position, with a
number of compensatory variances contributing to this overall position.  Employee
costs are forecast to underspend by £2.155m as a result of vacancy savings, together
with underspend of £0.379m in administration costs due to grant income received in
advance of need, partially offset by increased external advisor costs. This is offset by
an under-recovery in income of £1.585m in relation to membership fees and site
admissions within the Active and Creative Communities estate, transport & plant
overspend of £0.385m due to additional costs of work being outsourced prior to
completion of a new depot facility, and forecast overspend of £0.494m on payments to
other bodies in relation to pest control sub-contractors and increased penalty charge
notice rates. 
2.6 Chief Executives and Other Corporate Services is reporting a projected underspend of
£0.595m, which is a favourable movement from previously reported breakeven position
at P5.  This position is primarily as a result of employee vacancy savings across the
service of £0.352m, and an underspend of £0.517m within supplies and services in
respect of ICT contracts. These underspends are partially offset by an overspend of
£0.136m in administration costs due to legal fees and projected insurance premium
increases, and a net under recovery of income mainly in relation to photocopying and
registers fees, partially offset by an over recovery in rent allowances. 
2.7 In respect of loan charges and interest earned on revenue balances members were
previously advised that due to significant uncertainty and volatility within market
conditions, and other variables, there is a risk of movement in the level of net financing
costs expected in the current financial year.  Following further consideration and
updating of a number of factors, including latest projections on profiled capital
expenditure, further refining of interest on revenue balances modelling and interest
rates observed, £3.000m of the overall forecast net over recovery on budget is
reported. Members should note that some of the factors contributing to the overall
financing costs position are purely timing, therefore, it is prudent to ensure the funding
to manage these elements is earmarked in line with the overall longer term funding
strategy for loan charges and interest on revenue balances.  The final position in this
respect will be kept under review and reported as part of the year end process. 
2.8 Members are also advised that the budget for both council tax income and council tax
reduction (CTR) are monitored on an ongoing basis. This includes consideration of
council tax collection, CTR uptake and household numbers. In addition, an assessment
of Expected Credit losses will be required.  An update on this position will be reported
further into the financial year. 
Page 67 of 218

Page 68

2.9 Negotiations are ongoing in relation to the 2024/25 non-Teachers pay award.  However
COSLA has agreed to make payments to employees based on the current offer on the
table of a 3.6% uplift or £0.67 per hour, whichever is greater. The inflationary uplift in
relation to Teachers pay for 2024/25 has been agreed at 4.27%. The full implications
of these, including any shortfall in expected funding will be incorporated into the
monitoring position in due course. 
2.10 Members should note that Scottish Government has indicated that £53m of their
funding towards local government pay will be made through capital funding for 2024/25.
Local Government Finance Circular 9/2024 provides a temporary amendment to the
statutory accounting requirements for capital grant which will allow authorities a number
of flexibilities in accounting for the capital grant in such a way that it can be used to
offset the revenue pressures linked to pay award.  In line with recent years, it is
expected that the Council will be asked to absorb a proportion of the £53m capital
funding in lieu of revenue funding, which may have an impact on the net budget
illustrated in appendix 1 as a result of applying the flexibilities. An update will be
provided to members once confirmed. 
2023/24 Budget Savings 
2.11 As outlined in paragraph 2.2 above, the Council has approved net savings of £21.667m
for 2024/25.  Each Service reports on the achievement of their savings within the
relevant service monitoring report.  It is projected that £20.245m of savings (93%) will
be achieved in the current year, with the in-year gap of £1.422m being fully mitigated
by replacement savings. 
Earmarked Reserves and Change Management Fund 
2.12 The Council’s audited annual accounts highlight a General Fund reserve balance of
£283.893m.  This balance includes £8.000m for the Contingency Fund, with a further
£245.690m earmarked for specific future commitments including £19.358m allocated
to the Change Management Fund to support one off costs of approved. The remaining
£30.203m of funds represent balances that were not earmarked as at 31 March 2024
and have therefore been set aside to support future budget strategies. 
2.13 A total of £155.348m of earmarked reserves is profiled for use in 2024/25 with a further
£90.342m profiled for use in future years. It is currently projected that £61.795m will be
spent during this financial year with £183.868m anticipated to be required in future
years, and £0.027m no longer required. A summary position is shown in Appendix 2. 
Taking into account the projected forecast surplus of £3.595m, and the drawdown of
historic balances from the Capital Fund of £2.951m, it is expected that at the end of the
financial year the General Fund will include non-earmarked balances of £36.776m as
detailed in Appendix 3.  These balances are to support future budget challenges in
accordance with the approved reserves policy, and any budget smoothing strategy
recommended by the S95 Officer. 
Risks and Uncertainty 
2.14 All activities undertaken by the Council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy, Services manage these as part of their
overall corporate and service planning processes.  The current economic climate and
pay and non-pay inflation continuing at historically high levels, are some of the key
factors that have the potential to impact upon the Council’s ability to provide quality
services within approved budget levels. 
Page 68 of 218

Page 69

Housing Revenue Account 
2.15 The Housing Revenue Account is currently projecting an underspend of £1.500m for
the financial year, mainly in relation to repairs and administration costs.  The service
anticipates that £1.165m of savings (100%) will be delivered by year end. 
Adult Health and Social Care 
2.16 Council Adult Health and Social Care provision to the Integration Joint Board (IJB) is
projecting an underspend of £0.477m.  This position is due to a projected net
underspend in employee costs of £5.461m primarily as a result of a non-recurring
temporary reduction in employer’s superannuation costs coupled with slippage in
recruitment, and an underspend of £0.071m in supplies and services.  These
underspends are partly offset by a projected overspend of £4.517m in payments to
other bodies and transfer payments primarily in relation to the care at home sector who
provide services to individuals via the SDS commissioning framework, higher than
anticipated transport and plant costs of £0.573m mainly in relation to internal transport
charges and staff mileage costs.  However, it should be noted that the reduction in
pension cost is part of the delivery plan solution to manage an overall recurring cost
pressure of £11.4m over 2024/25 and 2025/26. 
3. Measures of success 
3.1 The Council continues to operate within approved budgeted resources.   
4. Supporting documentation
Appendix 1 Summary by Division
Appendix 2 Anticipated Commitments – Earmarked Reserves
Appendix 3 Availability of One-Off Funds – Change Management Fund 
Elaine Kemp
Chief Officer (Finance) 
Page 69 of 218

Page 70

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
Page 70 of 218

Page 71

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐
Page 71 of 218

Page 72

LINE SERVICE  ACCOUNT ANNUAL PROVISIONAL
NO. BUDGET OUTTURN
(1) (2) (3) (4)
£      £      £     
1 Education, Children & Families 513,355,887                513,355,887                -                              
2 Early Years 33,841,264                  33,841,264                  -                              
3 Primary Schools 156,200,787                156,200,787                -                              
4 Secondary Schools 146,348,721                146,348,721                -                              
5 Special Schools 25,674,788                  25,674,788                  -                              
6 Education & Families Service Delivery 101,587,567                101,766,076                (178,509 )                  
7 Childrens Services Social Work 39,681,963                  40,104,682                  (422,719 )                  
8 Justice Services 91,690                        (36,561 )                       128,251                   
10 Employability 2,861,086                    2,631,046                   230,040                   
11 Community Learning 5,142,950                    5,004,038                   138,912                   
12 Tackling Poverty 1,925,071                    1,821,046                   104,025                   
13 Enterprise & Communities 201,922,346                201,922,346                -                              
14 Assets & Procurement 37,569,400                  37,569,400                  -                              
15 Trading Accounts (462,202 )                      (143,778 )                     (318,424 )                  
16 Community Operations 148,054,060                148,499,212                (445,152 )                  
17 Housing Management 5,613,776                    5,519,518                   94,258                     
18 Housing Property Services -                                 -                                 -                              
9 Active and Creative Communities -                                 -                                 -                              
19 Place 11,147,312                  10,477,994                  669,318                   
20 Chief Executives & Other Corporate Services 104,751,925                104,157,157                594,768                   
21 Directorate & Support 514,437                       549,484                      (35,047 )                    
22 Finance 45,111,074                  44,997,486                  113,588                   
23 Audit & Risk 577,028                       569,655                      7,373                       
24 Legal & Democratic 2,448,234                    2,418,374                   29,860                     
25 Business & Digital 23,102,277                  22,707,849                  394,428                   
26 People Resources 8,533,063                    8,533,063                   -                              
27 Strategic Communication and Engagement 5,126,925                    5,126,925                   -                              
28 Other Corporate Services 5,784,817                    5,700,251                   84,566                     
29 Joint Boards 13,554,070                  13,554,070                  -                              
30 Social Work (non Integrated) 210,733,816                210,733,816                -                              
31 GENERAL FUND SERVICES 1,030,763,974              1,030,169,206             594,768                   
32 FINANCING COSTS (36,205,584 )                 (39,205,584 )                 3,000,000                 
33 Reversal of Capital Charge (87,964,980 )                 (87,964,980 )                 -                              
34 Loan Charges and Interest on Revenue Balances 51,759,396                  48,759,396                  3,000,000                 
35 OTHER BUDGETARY ISSUES 16,425,863                  16,425,863                  -                              
36 Assumptions not yet Realised 16,425,863                  16,425,863                  -                              
37 Transfer from capital grant (Pay Award) -                                 -                              
38 TOTAL EXPENDITURE 1,010,984,253              1,007,389,485             3,594,768                 
39 SOURCES OF FUNDING 1,010,984,253              1,010,984,253             -                              
40 Aggregate External Finance 836,438,788                836,438,788                -                              
41 Council Tax 168,999,465                168,999,465                -                              
42 Use of balances 5,546,000                    5,546,000                   -                              
43 FORECAST (SURPLUS)/DEFICIT: TO SUPPORT FUTURE
BUDGETS
-                                 (3,594,768 )                  3,594,768                 
44 HOUSING REVENUE ACCOUNT (SURPLUS) / DEFICIT -                                 (1,500,000 )                  1,500,000                 
45 ADULT HEALTH AND SOCIAL CARE (SURPLUS) /DEFICIT (477,241 )                     477,241                   
Appendix  1
NORTH  LANARKSHIRE COUNCIL
SUMMARY BY DIVISION FOR PERIOD ENDING 13 September 2024 (PERIOD 6)
PROVISIONAL
VARIANCES
Page 72 of 218

Page 73

Appendix 2
2024/25 Future Years Total
Opening
Reserve
Balances 
2024/25
Revised
Earmarked
Reserve 
24/25
Projected
Spend 
Anticipated
Year End
Balance 
Anticipated
Future Year
Use 
No Longer
Required 
Profiled for
Future Years 
Anticipated
Future Year Use 
No Longer
Required 
No Longer
Required
£000 £000 £000 £000 £000 £000 £000 £000 £000 £000 Check Future Years
Change Management Fund 19,358         2,645           2,645         -                  -                  -               16,713              16,713              -               -                   16,713      -          
Earmarked & One Off Resources
Schools Future Contractual Obligations 60,969         -                  -                -                  -                  -               60,969              60,969              -               -                   60,969      -          
Strategic Workforce Planning 17,902         17,902         3,886         14,016         14,016         -               -                       -                       -               -                   -           -          
Temporary Teachers 823             823              823            -                  -                  -               -                       -                       -               -                   -           -          
Temporary Accommodation 8,038          8,038           -                8,038           8,038           -               -                       -                       -               -                   -           -          
Early Years & Childcare Expansion 5,213          3,332           3,332         -                  -                  -               1,881                1,881                -               -                   1,881        -          
Refugee Resettlement Programmes 8,323          4,347           4,347         -                  -                  -               3,976                3,976                -               -                   3,976        -          
Loans Charges 17,905         17,905         -                17,905         17,905         -               -                       -                       -               -                   -           -          
Unmanaged burdens within Education, Children & Families 4,234          4,234           4,234         -                  -                  -               -                       -                       -               -                   -           -          
Pupil Equity Fund 2,153          2,153           2,153         -                  -                  -               -                       -                       -               -                   -           -          
Balances held by Schools under Devolved School Management 2,655          2,655           2,655         -                  -                  -               -                       -                       -                                  - -           -          
Economic Recovery 1,519          1,519           1,519         -                  -                  -               -                       -                       -               -                   -           -          
Whole Family Wellbeing 4,417          2,071           1,271         800             800             -               2,346                2,346                -               -                   2,346        -          
Winter Reserve 1,500          1,500           1,500         -                  -                  -               -                       -                       -               -                   -           -          
Business Gateway and Business Recovery 1,697          878              878            -                  -                  -               819                   819                   -               -                   819          -          
Strategic Capital Investment Programme 44,800         44,800         -                44,800         44,800         -               -                       -                       -               -                   -           -          
One Workforce Grading Pressures 5,000          5,000           -                5,000           5,000           -               -                       -                       -               -                   -           -          
Digital NL 1,222          1,222           1,222         -                  -                  -               -                       -                       -               -                   -           -          
Mobilisation of Strategic Contracts 2,177          2,177           2,144         33               33               -               -                       -                       -               -                   -           -          
Shared prosperity Grants 1,753          1,753           1,753         -                  -                  -               -                       -                       -               -                   -           -          
Teacher Induction Scheme Support 1,302          1,302           1,302         -                  -                  -               -                       -                       -               -                   -           -          
Budget One-off Investment 8,119          8,119           6,901         1,218           1,218           -               -                       -                       -               -                   -           -          
Other Earmarked Funds 24,611         20,973         19,230       1,743           1,716           27            3,638                3,638                -               27                 3,638        -          
Earmarked & One Off Resources Total 226,332       152,703       59,150       93,553         93,526         27            73,629              73,629              -               27                 73,629      -          
Total Reserves 245,690       155,348       61,795       93,553         93,526         27            90,342              90,342              -           27                 90,342      -          
Contingency Reserve 8,000         
Non-Earmarked Balance; to support future budget challenges 30,203        
General Fund Surplus at 31 March 2024 283,893      
ANTICIPATED COMMITMENTS AGAINST EARMARKED RESERVES AS AT 13 September 2024 (PERIOD 6)
NORTH LANARKSHIRE COUNCIL
Page 73 of 218

Page 74

Appendix 3
£000 £000
Total Balance B/f per 2023/24 Annual Accounts 19,358 30,203
Period 4 reported variance 3,595
Earmarked Reserves no longer required 27
Total Balance 2024/25 before commitments 19,358 33,825
Revised one - off costs of approved savings (2,645)
Draw down from Capital Fund 2,951
Total Balance 2024/25;  to support future budget challenges 16,713 36,776
Known Commitments :- Revised one - off costs of approved savings (2,774)
Forecast Balance;  to support future budget challenges 13,939 36,776
NORTH  LANARKSHIRE COUNCIL
AVAILABILITY OF GENERAL FUND BALANCES AS AT 13 September 2024 (PERIOD 6)
Change Management
Fund
Non-Earmarked
General Fund
Page 74 of 218

Page 75

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    EK/NL/PF Date 20/11/24 
Revenue Budget Monitoring Report; Chief Executive’s Service
01.04.24 – 13.09.24 (Period 6) 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail KempE@northlan.gov.uk Telephone 01698 302408 
Executive Summary
This report provides a summary of the Chief Executive’s Service financial performance for
the period 1 April 2024 to 13 September 2024 (Period 6).   The report illustrates the
provisional outturn as at 31 March 2025, with major outturn variances highlighted and
explained per the Council’s approved Financial Regulations. 
The Council approved its General Fund Revenue Budget on 15 February 2024, of which
£104.752m currently represents the net revenue budget for the Chief Executive’s Service.   
Incorporated within the revenue budget are approved service savings totalling £1.707m.   
The Service is currently projecting a year-end underspend of £0.595m for the financial year
predominately as a result of employee vacancies and underspends relating to ICT
contracts. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the financial position of the 2024/25 Chief Executive’s Service revenue
budget.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 8
Page 75 of 218

Page 76

1. Background 
1.1 The Council’s approved Financial Regulations require the Chief Executive to remain
within the approved budgetary provision, and to report all significant deviations -
defined as the higher of £100,000 or 5% - within budget monitoring reports. Where
significant deviations are identified, the Chief Executive must provide explanatory
commentary, outline the action required to rectify such deviations and where relevant,
must also highlight the impact this has on other budget headings. 
2. Report 
Summary of Financial Position 
2.1 The Council approved its General Fund Revenue Budget on 15 February 2024, of
which £104.746m (10.38%) represented the approved Revenue Budget for the Chief
Executive’s Service. In-year transfers from Education, Children and Families results in
a revised budget of £104.752m. 
2.2 The overall projected outturn position of the Service is a year-end underspend of
£0.595m.  Appendices one to five provide further information in respect of this position. 
2.3 As at Period 6 the position on Council Tax Reduction Scheme remains under review
along with other elements of the Council Tax Product including household numbers and
council tax collection for the year.  The Council Tax Product will then be assessed for
expected credit losses as part of the year end process. It is currently anticipated there
will be no material variance overall.   
2.4 The 2024/25 budget incorporates £1.707m of savings which are listed in Appendix 5.  
Of this, £1.027m relates to service specific savings approved by Council in February
and these have been fully delivered as at P6 through service restructures and a
reduction in operational budgets.  Furthermore, the historic underspend savings target
of £0.680m has also been fully achieved across the service. 
Analysis of Significant Variances 
2.5 The service currently anticipates a projected underspend of £0.352m within Employee
costs as a result of actual and projected vacancies.   
2.6 Costs in relation to the annual insurance premium coupled with building costs relating
to the Civic Centre has resulted in a projected overspend of £0.181m within Property
Costs. 
2.7 Within Supplies and Services the service is projecting a year end underspend of
£0.517m which represents savings within Business and Digital resulting from the
current usage levels of cloud-based systems. 
2.8 The service is currently anticipating an overspend of £0.137m within Administration
Costs predominately due to increased projected costs for Insurance Premiums, legal
fees as a result of the level of Solicitor vacancies meaning external advice is required
and postages, partially offset by training costs. 
2.9 The projected outturn for income is an under-recovery of £0.014m predominately
attributable to under-recoveries within legal insurance, licensing and registrars offset
by rent allowances / rent rebates overpayments and interest received.
Page 76 of 218

Page 77

2.10 There are various minor variances across other budget areas resulting in the Service
forecasting a year-end underspend of £0.595m as at 31 March 2025. 
Earmarked and One-off Reserves 
2.11 In finalising the Council’s draft accounts to 31 March 2024, the service was given
approval to earmark £3.567m of resources to fund key projects and initiatives profiled
over a number of years.  It is anticipated that £2.402m of the reserves balances will be
utilised in 2024/25 with £1.143m required for future years and a balance of £0.022m to
be returned to reserves.  Details of the Service’s earmarked funds are provided in
Appendix 4.    
2.12 The Service has also been given approval to utilise £1.059m of funds from the
Corporate Strategic Workforce Planning Reserve over a number of years.  It is
anticipated £0.294m of this reserve will be utilised in 2024/25 and actual costs arising
will be reported in future reports.  These funds are not included in the Service outturn
position. 
2.13 The Service was also given approval to utilise £0.293m of funds from the Change
Management Fund over several years.  It is anticipated that £0.017m will be utilised in
2024/25 and actual costs will be reported in future reports.  These funds are not
included in the Service outturn position. 
2.14 The Service has incurred £0.338m VRS costs relating to approved
savings/restructures.  Therefore, there is a requirement to utilise the Corporate Change
Management fund at this time.  Any further costs arising will be reported in future
reports as they are incurred.  These costs are not included in the Service outturn
position. 
2024/25 Budget Savings 
2.15 The Council approved service savings of £1.707m savings of which £1.707m have
been fully delivered as at Period 6.  Further information regarding savings is included
in Appendix 5. 
Management Actions 
2.16 The Service is being pro-active to ensure expenditure is contained within its approved
2024/25 budget. 
3. Measures of success 
3.1  The Service continues to operate within approved budget resources.   
4. Supporting documentation 
Appendix 1 Objective Summary 
Appendix 2 Subjective Summary 
Appendix 3 Payments to Other Bodies 
Appendix 4 Earmarked Reserves 
Appendix 5 Budget Savings
Page 77 of 218

Page 78

Elaine Kemp
Chief Officer (Finance)
Page 78 of 218

Page 79

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
As stated in the main body of the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 79 of 218

Page 80

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
All activities undertaken by the Council are subject to risk, and in acknowledging the
Council’s approved Risk Management Strategy, Services manage these as part of
their overall corporate and service planning processes. The current economic
climate, in particular, has the potential to impact upon the Council’s ability to provide
quality services within approved budget levels. 
To minimise risk, this report has been prepared by service based Finance
personnel in consultation with budget managers, in accordance with the Financial
Regulations. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 80 of 218

Page 81

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 81 of 218

Page 82

APPENDIX 1
[1] [2] [3] [5] [6] [7]
DIRECTORATE & SUPPORT 514,437 549,484 (35,047) ADV (6.8%) (1,312) Overspend in Legal Fees as a result of seeking external advice due
to solicitor vacancies.
FINANCE 45,111,074 44,997,486 113,588 FAV 0.3% 113,588
Underspends due to vacancies and an over-recovery in income
relating to rent allowances / rent rebates overpayments offset by
projected overspends in insurance premiums and postages.
AUDIT & RISK 577,028 569,655 7,373 FAV 1.3% 7,373 Underspends due to vacancies.
LEGAL & DEMOCRATIC
SOLUTIONS 2,448,234 2,418,374 29,860 FAV 1.2% 53,430
Underspends within employee costs and postages offset by an under-
recovery in income in relation to insurance, photocopying and
registrars.
BUSINESS & DIGITAL 23,102,277 22,707,849 394,428 FAV 1.7% 237,273 Underspends within ICT contracts linked to the timing of costs
associated with cloud based systems and vacancies.
PEOPLE RESOURCES 8,533,063 8,533,063 0 0.0% 127,484 Underspends within Employee Costs and training budgets are offset
by turnover resulting in a balanced budget.
STRATEGIC COMMUNICATIONS 5,126,925 5,126,925 0 0.0% 44,575 Balanced budget.
OTHER COPORATE SERVICES 5,784,817 5,700,251 84,566 FAV 1.5% 12,357
Underspend predominately relates to NLP Financial Guarantee and
interest received offset by projected costs associated with
byelections.
JOINT BOARDS 13,554,070 13,554,070 0 0.0% 0 Balanced budget.
NET EXPENDITURE 104,751,925 104,157,157 594,768 FAV 0.6% 594,768
[4]
PERIOD
MOVEMENT ANALYSIS
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Objective Analysis
Period 06 (01 April 2024 - 13 September 2024)
A - Chief Executives Service
DIVISION OF SERVICE ANNUAL BUDGET PROJECTED
OUTTURN
PROJECTED OUTTURN
VARIANCE %
Page 82 of 218

Page 83

APPENDIX 2
[1] [2] [3] [5] [6] [7]
EMPLOYEE COSTS 41,584,276 41,232,506 351,769 FAV 0.9% 185,169 Underspends due to vacancies partially offset by overtime costs.
PROPERTY COSTS 1,846,382 2,027,497 (181,115) ADV (9.8%) (45,000) Assumed increased costs relating to the insurance premium coupled
with building costs relating to the Civic Centre.
SUPPLIES & SERVICES 10,730,875 10,213,715 517,160 FAV 4.8% 268,535 Underspends within ICT contracts linked to the timing of costs
associated with cloud based systems
TRANSPORT & PLANT 365,671 333,200 32,471 FAV 8.9% 32,363 Minor
ADMINISTRATION COSTS 8,200,674 8,337,241 (136,567) ADV (1.7%) 59,032
Assumed insurance premium increase, legal fees as a result of using
external advice due to the level of internal vacancies and postages
offset by training costs.
PAYMENTS TO OTHER BODIES 15,633,564 15,664,004 (30,440) ADV (0.2%) 3,890 Projected costs associated with by-elections and medical fees.
TRANSFER PAYMENTS 108,757,069 108,757,069 0 0.0% 0
CAPITAL FINANCING COSTS 6,812,218 6,742,994 69,224 FAV 1.0% 0 Over-recovery of income re NLP Financial Guarantee.
REVENUE FINANCING COSTS 0 0 0 0.0% 0
OTHER EXPENDITURE 5,076,864 5,090,585 (13,721) ADV (0.3%) 23,627 Miscellaneous costs associated with the purchase of Cumbernauld
Shopping Centre.
TOTAL EXPENDITURE 199,007,594 198,398,810 608,783 FAV 0.3% 527,618
INCOME (94,255,669) (94,241,653) (14,015) ADV 0.0% 67,150
Under-recovery in income in relation to insurance, photocopying and
registrars offset by over-recoveries for Rent Allowances / Rent
Rebates Overpayments and interest.
NET EXPENDITURE 104,751,925 104,157,157 594,768 FAV 0.6% 594,768
[4]
PERIOD
MOVEMENT ANALYSIS
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Subjective Analysis
Period 06 (01 April 2024 - 13 September 2024)
A - Chief Executives Service
CATEGORY ANNUAL BUDGET PROJECTED
OUTTURN
PROJECTED OUTTURN
VARIANCE %
Page 83 of 218

Page 84

APPENDIX 3
[1] [2] [3] [5] [6] [7]
PAYMENTS TO OTHER BODIES GENERAL 669,400 699,400 (30,000) ADV (4.5%) 0 Projected costs associated with by-elections.
MEDICAL FEES 10,659 16,665 (6,006) ADV (56.4%) (111) Increased costs in relation to medical fees.
AGENCY FEES 71,686 71,686 0 0.0% 0
TOWN TWINNING 0 0 0 0.0% 0
CHILDRENS PANEL 25,035 21,035 4,000 FAV 16.0% 4,000 Minor variance 
COSLA ANNUAL LEVY 195,000 193,434 1,566 FAV 0.8% 0 Minor variance 
COMMUNITY COUNCIL GRANTS 125,222 125,222 0 0.0% 0
GRANTS TO ORGANISATIONS 987,294 987,294 0 0.0% 0
EXTERNAL AUDIT FEE 679,389 679,389 0 0.0% 0
ELECTION PROVISION 0 0 0 0.0% 0
TOURISM - VISIT NORTH LANARKSHIRE 37,000 37,000 0 0.0% 0
SCOTTISH WELFARE FUND 2,759,844 2,759,844 0 0.0% 0
SUB-CONTRACTOR PAYMENTS 1,869 1,869 0 0.0% 0
LOCAL TAX PAYPOINT COMMISSION 35,000 35,000 0 0.0% 0
COSLA MIGRATION SCOTLAND 150,000 150,000 0 0.0% 0
LANDS VALUATION CONTRIBUTION 1,814,004 1,814,004 0 0.0% 0
SPT CONTRIBUTION 5,472,132 5,472,132 0 0.0% 0
SPT CONCESSIONARY FARES CONTRIBUTION 579,419 579,419 0 0.0% 0
CUSTOMER FIRST CONTRIBUTION 2,700,000 2,700,000 0 0.0% 0
TOTAL EXPENDITURE 16,312,953 16,343,393 (30,440) ADV (0.2%) 3,889
[4]
PROJECTED OUT-TURN
VARIANCE
PROJECTED OUT-
TURN % PERIOD
MOVEMENT ANALYSIS
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Payments to Other Bodies
Period 06 (01 April 2024 - 13 September 2024)
A - Chief Executives Service
CATEGORY ANNUAL BUDGET
Page 84 of 218

Page 85

APPENDIX 4
Value %
Service Specific Earmarked Reserves:
Admin of Covid and Cost of Living related support scheme 11,919 0 11,919 11,919 11,919 100.0% 11,919
COL Grant 34,645 0 34,645 34,406 34,645 100.0% 34,645
Modern Apprentices 75,838 (18,959) 56,879 14,099 25,349 44.6% 31,530 25,349
Service will look to appoint a further 1fte from the
winter Intake and therefore require the balance to be
carried forward to support these costs.
Insurance Premiums 812,876 0 812,876 812,876 812,876 100.0% 812,876
Digitisation 83,797 0 83,797 83,797 83,797 100.0% 83,797
B&D - Investment model replacement of funds 627,000 (168,382) 458,618 121,551 458,618 100.0% 458,618
NLC10 posts 21,849 0 21,849 0 0 0.0% 21,849 0 Budget no longer required as project is now
complete.
NLC12 post 312,055 (251,905) 60,150 22,711 57,182 95.1% 2,968 57,182 Balance of budget required to support residual costs
in 2025/26.
B&D - Backfill for EUC Infrastructure Team (Windows 11) 137,900 0 137,900 42,543 104,576 75.8% 33,324 104,576 Balance of budget required to support residual costs
in 2025/26.
Learning Academy 100,000 0 100,000 21,658 100,000 100.0% 100,000
Construction Academy 228,000 0 228,000 0 43,881 19.3% 184,119 43,881 Balance required in 2025/26 to support ongoing
commitments.
CSH Recover NL 81,000 0 81,000 0 81,000 100.0% 81,000
Recover NL CSH 2022/23 (Single Number) 457,861 (93,699) 364,162 0 59,496 16.3% 304,666 59,496 Recruitment exercise currenlty underway, balance
will be required to be carried forward.
Recover NL Grants 23,863 0 23,863 1,924 23,863 100.0% 23,863
Cost of Living (Comms) 35,372 0 35,372 7,000 35,372 100.0% 35,372
Cumbernauld Community Grants (Antonine Centre) 225,000 0 225,000 225,000 100.0% 225,000
Grant award Programme 148,000 (54,000) 94,000 94,000 94,000 100.0% 94,000
Audit Fee 150,000 0 150,000 0 150,000 100.0% 150,000
TOTAL 3,566,975 (586,944) 2,980,030 1,268,485 2,401,575 556,606 21,849 2,401,575
FINANCIAL YEAR - 2023/24
DESCRIPTION OF EARMARKED RESOURCE Reserve
Allocation
Profiled in
Future Years
Approved
Reserve
Total
Spend to
Date
Projected Spend
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Status of Earmarked Reserves
Period 06 (01 April 2024 - 13 September 2024)
A - Chief Executives Service
Reprofile to
Future Years
No Longer
Required
Reserves
Required In
Year
Commentary Regards Usage
Page 85 of 218

Page 86

APPENDIX 5
£000 £000 £000
01CEX Directorate & Support - Reivew of Support
Services 56 56 0
03CEX Directorate & Support 4 4 0
04CEX Finance (5%) 48 48 0
07CEX Legal & Democratic - Central Services (10%) 14 14 0
13CEXD Business & Digital - Reivew of Support Services 43 43 0
10CEX Business & Digital - Digital / Field Services -
Technical Support to Education & Families 92 92 0
11CEXD Business & Digital - DigitalNL (MS Licences) 200 200 0
12CEX Business & Digital - Technoclogy Solutions -
restructure and review of contracts 110 110 0
13CEX Business & Digital - Business Strategy 154 154 0
19CEX Strategic Communications & Engagement -
Corporate Communications 149 149 0
20CEX Strategic Communications & Engagement -
Communities 157 157 0
Historic Recurring Underspends 680 680 0
TOTAL 1,707 1,707 0
NORTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report - Savings
Period 06 (01 April 2024 - 13 September 2024)
A - Chief Executives Service
APPROVED SAVINGS
Ref. DESCRIPTION OF APPROVED SAVING Target Value Value
Deliverable Savings Gap Reasons for Savings Gap
Page 86 of 218

Page 87

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    EK/GT/RM Date 20/11/24 
Capital Programme 2024/25 Monitoring Report 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail kempe@northlan.gov.uk Telephone 07939 280 601 
Executive Summary
The purpose of the report is to provide an update on the 2024/25 resources and
expenditure for the Council's Strategic Capital Investment Programme. The report shows
the 2024/25 projected outturn position and the resultant variances. 
It is currently anticipated that the General Fund programme will have a projected
programme expenditure variance of £5.923m, primarily due to the ongoing reassessment
of vehicle replacement programme requirements, and timing delays within Town and
Community Hub programme. 
The HRA programme is currently anticipated to outturn on budget.  
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledges the provisional outturn financial position of the Council’s Strategic
Capital Investment Programme as at 13 September 2024. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 9
Page 87 of 218

Page 88

1. Background 
1.1 The Strategic Capital Investment Programme 2024/25 to 2028/29 was approved at
Policy and Strategy Committee in March 2024 and represents the total Community
Investment Programme incorporating the General Services Capital Programme and
HRA Capital Programmes.  The programme was developed in conjunction with
Services and led by the Strategic Capital Delivery Group (SCDG) using the principles
established by the Council’s Capital Strategy. 
1.2 The General Services Capital Programme supported by General Services resources
demonstrates to communities that the place making visions for towns remains a priority
and that the approved 5-year capital investment plan supports delivery of The Plan for
North Lanarkshire. The programme includes additional investment in Town and
Community Hubs, the City Deal programme, and external grant funding. 
1.3 In addition, the Housing Revenue Account (HRA) resources support several HRA
Capital Investment Programmes including the Mainstream programme for investment
in the Council’s existing estate and delivery of the ambition for 5,000 additional supply
through the New Build and Council Buy Back programmes. 
1.4 The 2024/2025 General Services Capital Programme is currently £143.101m with a
£111.291m investment programme in relation to the Housing Revenue Account. This
reflects the approved budget in March 2024 at Policy and Strategy Committee and
subsequent decisions made at the Strategic Capital Delivery Group (SCDG) in
accordance with the SCDG terms of reference, and where appropriate either by the
individual service committees, Finance and Resources Committee or the Policy and
Strategy Committee per the Scheme of Administration. Appendix 1 provides a
breakdown of the overall 2024/25 budget by Service Programme and associated
approved budget movements. 
2. Report 
Overall Council Strategic Capital Investment Programme 
2.1 The overall Council Strategic Capital Investment programme for 2024/25 and the
provisional outturn to 31 March 2025 is summarised in Table 1 as follows: 
Page 88 of 218

Page 89

2.2  On a budgeted programme of £254.392m expenditure is anticipated to be £5.923m 
lower than current programme at this stage of the financial year. Further financial 
performance information regarding each of the programmes is discussed in section 2.3 
and 2.16 below. 
General Services Capital Programme and Projected Outturn by Service/ Programme 
2.3 The forecast financial performance of the overall General Services Investment
programme at 31 March 2025 is detailed in Appendix 2 and summarised below.
Community Capital Investment  Programme Summary 2024/25
Current
Programme
£000s
Projected
Outturn 
£000s
Outturn
Variance 
£000s
Enterprise & Communities 131,607 125,684 5,923
Chief Executives 9,323 9,323 0
Adult Health & Social Care 2,171 2,171 0
General Services: Total Capital Investment 143,101 137,178 5,923
General Services Resources:
General Fund
External Grants & Contributions 2023/24 36,824 36,824 0
External Grants & Contributions b/f 2022/23 7,203 7,203 0
External Grants & Contributions Unapplied (3,439) (3,439) 0
Net External Grants & Contributions 40,588 40,588 0
Advanced Developers Contributions 0 1,507 1,507
Capital Receipts 3,250 4,920 1,670
Capital Receipts -Transfer to Capital Fund 0 0 0
CFCR 24,383 24,383 0
General Services: Total Resources 68,221 71,398 3,177
General Services : Borrowing Requirement 74,880 65,780 (9,100)
HRA : Total Capital Investment 111,291 111,291 0
HRA Resources:
Net External Grants & Contributions 15,452 15,452 0
Capital Receipts 0 8 8
CFCR 20,089 20,089 0
HRA : Total Resources 35,541 35,549 8
HRA : Borrowing Requirement 75,750 75,742 (8)
Summary
Total Council : Capital Investment 254,392 248,469 5,923
Total Council : Resources 103,762 106,947 3,185
Total Council : Borrowing Requirement 150,630 141,522 (9,108)
Page 89 of 218

Page 90

General Services Total Resources 
2.4 The revised programme approved by the SCDG is £143.101m with total resources
available to meet the current programme forecast to be £68.221m, resulting in a
borrowing requirement of £74.880m. 
2.5 In 2024/25 net external grants and contributions of £40.588m will be utilised. This
capital resource primarily includes the Scottish Government (SG) General Capital
Grant receivable of £22.270m and other specific SG Grants including City Deal
(£3.289m), Vacant and Derelict Land Fund (VDLF, £1.231m), Live Labs II (LLII
£1.369m), Traffic Signals and Road Safety Fund (TSRS, £2.434m) and Shared
Prosperity Fund (SPF £1.406m). It also includes contributions from other sources such
as Salix (£2.345m) and developer contributions of £4.483m. In addition, capital grants
received in 2023/24 have been added to the programme to match expenditure in
2024/25 including £1.418m for VDLF, £1.841m for PBIP, £1.875m for Regeneration
Capital Grant Fund, £1.477m for Live Labs II and £0.231m for Community Bus Fund.
This has been offset by £3.439m of external grant and contributions for Live Labs II
(LLII £1.864m), VDLF (£1.549m) and the Scottish Wildlife Trust (£0.026m) which will
not be applied in 2024/25 for projects which will not now be completed until 2025/26. 
2.6 Receipts from the sale of assets are currently projected to be £4.920m, which is
£1.670m greater than the budget of £3.250m. These receipts will continue to be closely
monitored throughout the financial year. 
2.7 While the approved 5-year capital programme has assumed phasing of known
utilisation of developer contributions, the accelerated timing of drawdown of these
contributions of an additional £1.507m during 2024/25 to match in-year expenditure
reduces the borrowing requirement for 2024/25 and will instead be required in 2025/26
financial year. 
General Services Total Expenditure 
2.8 As indicated in Table 1 the General Services investment programme is £143.101m. At
Period 6, the provisional outturn spend is £5.923m lower than current programme.
Further analysis by service/programme is outlined below and summarised within
Appendix 2. 
2.9 Enterprise and Communities is projecting outturn expenditure of £125.684m, which
is a £5.923m variance from current programme. 
Within the Community Operations theme, the ongoing assessment of the Council’s
vehicle requirements has resulted in a positive in-year variance in the vehicle
replacement programme of £3.227m. In addition, a delay in commencing the new
Roads and Infrastructure contract has resulted in a positive variance of £1.000m for the
LED Infrastructure project.  Discussions with the new provider Hochtief to establish the
delivery timescales will be undertaken. 
2.10 Within the Town and Community Hub theme, in-year expenditure on the St Kevin’s 
Community Hub project is now expected to result in a variance of £4.414m due to the 
requirement for additional pollution control testing and mitigation. These issues have 
now been resolved, financial close has been signed off and works have now 
commenced on the project. 
Page 90 of 218

Page 91

2.11 These are partially offset by cost increases within Assets and Procurement, where 
works have been accelerated within the Office Reconfiguration theme of £0.814m to 
support the needs of Services. 
2.12 Within Maintaining Existing Assets a programme variance of £0.978m is projected, 
primarily due to an emerging issue within the Time Capsule for the water sports facility 
and lifts within the venue, has resulted in forecast additional costs of £0.859m this 
financial year. The Service are working with tender returns to decide on the package 
of works required and timing for these works with a virement to be requested to resolve 
the funding for these works. Within this theme, there have also been cost increases 
experienced on a major rewire project mainly linked to additional asbestos removal 
works of £0.819m but these have been offset by underspends on roofing works and 
delaying of another rewire project, roofing and toilet works into next financial year. 
2.13 Additional unforeseen drainage works for two modular accommodation projects within 
Sustainable Estate theme and completion of the Heathery Park nursery project within 
the 1140 Early Learning and Childcare Expansion theme have resulted in cost 
increases of £0.223m and £0.300m respectively.  It is also anticipated that it will now 
be possible to accelerate demolition works resulting in an in-year variance of £0.469m.
These increased budget requirements will be managed by the Service within their
overall 5-year budget allocation.  
Committed expenditure of £85.035m is currently reported, which represents 67.66% of
the targeted expenditure, and actual expenditure is £35.489m which represents
28.24% of targeted expenditure. 
2.14 Chief Executives is projecting outturn expenditure of £9.323m, which is on budget.
Committed expenditure of £4.250m is currently reported, which represents 45.59% of
the targeted expenditure. Actual expenditure is £2.185m, which is 23.44% of targeted
expenditure.   
2.15 Adult Health & Social Care is projecting outturn expenditure of £2.171m, which is on
budget. Committed expenditure of £0.783m is currently reported, which represents
36.07% of the targeted expenditure, and actual expenditure is £0.624m which is
28.74% of targeted expenditure. 
HRA Capital Investment 
2.16 The financial performance of the HRA Capital Programme is reported in detail to the
Housing Committee.  A summary of performance as at 13 September 2024 is provided
at Appendix 3. Total expenditure of £111.291m is forecast for 2024/25 which is on
budget.   
2.17 Committed expenditure of £100.252m is currently reported, which represents 90.08%
of the targeted expenditure, and actual expenditure is £38.555m which is 34.6% of
targeted expenditure. 
3. Measures of success 
3.1  N/A   
4. Supporting documentation 
4.1 Appendix 1: Strategic Capital Investment Programme 2024/25 budget movements
Appendix 2: General Services Capital Investment Programme Summary 2024/25
Page 91 of 218

Page 92

Appendix 3: HRA Capital Investment Programme Summary 2024/25 
Elaine Kemp
Chief Officer (Finance) 
Page 92 of 218

Page 93

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The financial impact is outlined within the report.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 93 of 218

Page 94

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
Despite the updated programme approved at Policy and Strategy Committee in
March 2024 the capital programme continues to face challenges in relation to the
wider economic climate, linked to availability of materials, contractors and
inflationary pressures. These are currently being managed by services and Project
Boards associated with specific programme delivery and will continue to be
monitored throughout the year in accordance with the SCDG Terms of Reference
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 94 of 218

Page 95

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 95 of 218

Page 96

2024/25 Strategic Capital Investment Programme – budget movements                                                                                         Appendix 1 
Enterprise &
Communities
Chief
Executives
Adult Health
&Social Care Corporate
Total General
Services
Investment
Programme
Total HRA
Investment
Programme
Total
Community
Investment
Programme
£000s £000s £000s £000s £000s £000s £000s
24/25 Opening programme approved Policy& Strategy Committee 1 March '24 99,161 5,589 2,200 450 107,400 115,291 222,691
23/24 Overs/Unders Carry Forward 15,802 4,506 (29) (37) 20,242 0 20,242
24/25 Budget adjustments approved by SCDG 872 0 0 (872) 0 0 0
Increase/(Decrease) in Externally Funded Projects 18,789 1,031 0 0 19,820 0 19,820
Increase/(Decrease) in CFCR 3,010 0 0 0 3,010 0 3,010
24/25 Re-profiling of projects to future years approved by SCDG (6,027) (1,803) 0 459 (7,371) (4,000) (11,371)
Revised Capital Programme 2024/25 131,607 9,323 2,171 0 143,101 111,291 254,392
Page 96 of 218

Page 97

General Services Capital Investment Programme Summary 2024/25 - as at 31 March 2025 Appendix 2
Investment Current
Programme
2024/25
£000s
Projected
Outturn
2024/25
£000s
Outturn
Variance
2024/25
£000s
Committed
Expenditure
@ P6          
£000s
Committed
Expenditure  %
of Projected
Outturn
Actual
Expenditure 
@ P6      
£000s
Actual
Expenditure     
% of Projected
Outturn
Enterprise & Communities 131,607 125,684 5,923 85,035 67.66% 35,489 28.24%
Chief Executives 9,323 9,323 0 4,250 45.59% 2,185 23.44%
Adult Health & Social Care 2,171 2,171 0 783 36.07% 624 28.74%
Total General Services Investment 143,101 137,178 5,923 90,068 65.66% 38,298 27.92%
General Services Resources;
External Grants & Contributions 2024/25 36,824 36,824 0
External Grants & Contributions b/f 2023/24 7,203 7,203 0
External Grants & Contributions Unapplied cfwd to 2025/26 (3,439) (3,439) 0
Net External Grants & Contributions 40,588 40,588 0
Advanced Developers Contributions 0 1,507 1,507
CFCR 24,383 24,383 0
Capital Receipts 3,250 4,920 1,670
Total Resources  68,221 71,398 3,177
Borrowing Requirement: 
General Services 74,880 65,780 (9,100)
Total General Services Borrowing Requirement 74,880 65,780 (9,100)
Total Resources incl Borrowing Requirement 143,101 137,178 (5,923)
Page 97 of 218

Page 98

HRA Capital Investment Programme Summary 2024/25 - as at 31 March 2025 Appendix 3
Investment Current
Programme
2024/25
£000s
Projected
Outturn
2024/25
£000s
Outturn
Variance
2024/25
£000s
Committed
Expenditure
@ P6       
£000s
Committed
Expenditure     
% of Projected
Outturn
Actual
Expenditure
@ P6     
£000s
Actual
Expenditure  
% of
Projected
Outturn
Mainstream Programme 63,114 63,114 0 57,780 91.55% 21,519 34.1%
New Build Programme 35,541 35,541 0 35,541 100.00% 13,676 38.5%
Council Buy Back Scheme 12,636 12,636 0 6,931 54.85% 3,360 26.6%
Total HRA Investment 111,291 111,291 0 100,252 90.08% 38,555 34.6%
HRA Capital Resources;
External Grants & Contributions 15,452 15,452 0
External Grants & Contributions Unapplied 0 0 0
Net External Grants & Contributions 15,452 15,452 0
CFCR 20,089 20,089 0
Capital Receipts 0 8 8
Total Resources 35,541 35,549 8
Borrowing Requirement:
HRA - Mainstream 47,695 47,687 (8)
HRA - New Build 19,925 19,925 0
HRA - Buyback Scheme 8,130 8,130 0
Total Borrowing Requirement 75,750 75,742 (8)
Total Resources incl Borrowing Requirement 111,291 111,291 0
Page 98 of 218

Page 99

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    EK/NS/PF Date 20/11/24 
Chief Executive Service – Capital Monitoring Report 1 April to 13
September 2024 (Period 06) 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail KempE@northlan.gov.uk Telephone 01698 302408 
Executive Summary 
This report highlights the financial performance and projected outturn of 2024/25 Chief
Executive capital programme for the period ended 13 September 2024 (Period 06). 
In summary the Service has a total capital budget of £9.323m, comprising of £6.317m
within Business and Digital and £3.006m within Strategic Communications and
Engagement.  This budget reflects the budget approved by the Policy and Strategy
Committee in March 2024; balances carried forward from previous years subsequent
decisions made at the Strategic Capital Delivery Group (SCDG) in relation to reprofiling. 
The Service is currently projecting a break-even position at this stage of the financial year. 
Further explanation of management action taken by the Service is included within the main
report and attached appendices. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Considers the financial position of the 2024/25 Chief Executive capital programme.  
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 10
Page 99 of 218

Page 100

1. Background 
1.1 This report provides a summary of the Chief Executive Service financial performance
for the period 1 April 2024 to 13 September 2024 (Period 06), with major outturn
variances highlighted and explained per the Council’s approved Financial Regulations. 
1.2 The Council approved its Capital programme at Policy and Strategy Committee on 14
March 2024 with an allocated budget £6.620m for the current year.  In addition, carry
forwards from the previous year, Scottish Government funding for Play Areas and
decisions made at SCDG in relation to reprofiling have resulted in a revised Capital
Programme of £9.323m for the 2024/25 Financial Year as detailed in Appendix 1 of this
report.
1.3 The Council’s approved Financial Regulations required the Chief Executive to remain
within his approved budgetary provision, and to report all significant deviations –
defined as the higher of £0.100m or 5% - within their budget monitoring reports.  Where
significant deviations were identified, Chief Officers must provide explanatory
commentary, outline the action required to rectify such deviations and where relevant,
must also highlight the impact this has on other budget headings. 
2. Report 
Summary of Financial Position 
2.1 The Service is currently projecting a break-even position for the financial year 2024/25
following approval from SCDG to reprofile budgets into future years.  Capital budgets
and expenditure are summarised in Appendix 1. 
Analysis of Significant Variances 
2.2 A explanation of the current position within Business and Digital is detailed below: 
• Line of Business (LOB) 
Following approval from SCDG to reprofile £0.410m due to updated end-of-life
dates for equipment coupled with delays within the CRM Psychological Services
programme a break-even position is now forecast. 
• End User Devices (EUD)
Similarly following approval to reprofile £0.423m due to delays in placing orders
with the corporate refresh programme due to timing of upgraded models coupled
with reduced costs within the immersive programme, the service is now projecting
a break-even position. 
2.3 A explanation of the current position within Strategic Communications and Engagement
is detailed below: 
Following the recent reprofiling exercise of £0.970m due to the availability of suppliers
to deliver play projects by 31 March 2025 and prioritisation of UKSPF funding to support
groups applying for a Community Asset Transfer the service is projecting a break-even
position. 
Management Action 
2.4 The Service closely monitors all activities to ensure available budgets are maximised
whilst monitoring and actively managing the ongoing external challenges in delivery of
Page 100 of 218

Page 101

projects.  The Service continues to review the programme with updates being provided
to the SCDG and Committee. 
3. Measures of success 
3.1  The Service aim is to operate within approved budget resources over the term of the
capital programme. 
4. Supporting documentation  
4.1 Appendix 1 Summary Expenditure by Project / Theme 
Elaine Kemp
Chief Officer (Finance) 
Page 101 of 218

Page 102

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
As stated within the main body of the report. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 102 of 218

Page 103

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.9.1 All activities undertaken by the Council are subject to risk, and in
acknowledging the Council’s approved Risk Management Strategy, Services
manage these as part of their overall corporate and service planning
processes.  The current economic climate, in particular, has the potential to
impact upon the Council’s ability to provide quality services within approved
budget levels. 
5.9.2 To minimise risk this report was prepared by Finance personnel in
consultation with budget managers, in accordance with the Financial
Regulations. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 103 of 218

Page 104

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 104 of 218

Page 105

Theme 
Budget
£
Actual
£
Committed
£
Uncommitted
£
Projected
Outturn
£
Outturn
variance
£
Digitisation & Innovation 2,838,431          944,844           1,487,129        1,351,302           2,838,431           -                        
Line of Business (LOB) System Portfolio 1,835,243          453,925           453,925           1,381,318           1,835,243           -                        
End User Device (Eud) Refresh 1,301,045          108,794           341,707           959,338              1,301,045           -                        
Cyber 114,000             -                       -                       114,000              114,000              -                        
Capacity 128,000             -                       127,642           358                     128,000              -                        
Innovation 100,000             -                       -                       100,000              100,000              -                         
TOTAL BUSINESS and DIGITAL 6,316,719          1,507,563        2,410,403        3,906,316           6,316,719           -                        
Community Board Project Investment Fund 2,906,220          933,366           1,839,171        1,067,049           2,906,220           -                        
Community Asset Transfers 100,000             -                       -                       100,000              100,000              -                         
TOTAL STRATEGIC COMMUNICATIONS and
ENGAGEMENT 3,006,220          933,366           1,839,171        1,167,049           3,006,220           -                        
TOTAL CHIEF EXECUTIVES 9,322,939          2,440,930        4,249,574        5,073,365           9,322,939           -                        
YTD OUTTURN
Chief Executives Capital Programme 2024/25
Summary Expenditure by Thematic Categories
1st April 2024 - 13 September 2024 (Period 06)
Page 105 of 218

Page 106

Page 106 of 218

Page 107

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    EK/KS/RM/GM Date 20/11/24 
Treasury Management Monitoring Report for quarter ended 30
September 2024 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail McnameeR@northlan.gov.uk Telephone Ryan McNamee, Finance
Manager 
Executive Summary
This report fulfils the key requirements of the Council’s reporting procedures for Treasury
Management in accordance with the CIPFA Code of Practice on Treasury Management
and the CIPFA Prudential Code for Capital Finance in Local Authorities. It informs on the
quarterly Treasury Management activity for the period 1 July 2024 to 30 September 2024
and compliance with the mandatory treasury and prudential indicators. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the Treasury Management Activity for the quarter ended 30 September
2024 including the performance against the key treasury and prudential indicators. 
The Plan for North Lanarkshire
Priority  Improve North Lanarkshire's resource base
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 11
Page 107 of 218

Page 108

1. Background 
1.1 The Council manages its treasury activities in line with the CIPFA Code ‘Treasury
Management in the Public Services’. The Code requires the Council to produce reports
on its Treasury Management policies, practices and activities on a regular and ongoing
basis. The Council fulfils these obligations, in part, by the preparation of this Treasury
Management Monitoring report produced on a quarterly basis, encompassing a review
of performance. 
1.2 The Council’s “Treasury Management Strategy 2024/2025 and Treasury and
Prudential Indicators 2024/2025 to 2028/2029” was approved by Committee at its
meeting on 28 February 2024. The Treasury activity undertaken in the second quarter
of 2024/25 reflects the key requirements of the Council’s 2024/25 Treasury
Management Strategy, with the Public Works Loan Board (PWLB) and Long-term
Money Market being the prime source of long-term funds. In terms of investment
activity, this is conducted in accordance with the approved 2024/25 investment
strategy. 
2. Report 
Summary Position 
2.1 The net overall borrowing position to 30 September 2024 is £997.4m, which is a 
reduction of £31.6m from the position at the 30 June 2024.  A detailed breakdown of 
the net cash movement is shown in column (6) within Appendix 1 and is discussed 
below. 
Borrowing 
2.2 At the end of the quarter, total external debt amounted to £1,049.1m, a reduction of 
£13.3m. This was primarily due to repayment of existing PWLB debt of £16.8m, a 
reduction in lease payments under existing finance lease and Service Concessions 
obligations of £2.0m falling due for repayment. In addition, this was partly offset by an 
increase in net temporary borrowing of £5.5m, due to £85.5m of new borrowing being 
offset by £80.0m falling due for repayment. 
2.3 The Council’s approach to borrowing is in line with the approved strategy which aims 
to source long-term borrowing and take advantage of temporary (short-term) borrowing 
at attractive rates, and where possible, using internal cash balances, to meet the 
principal repayments, daily revenue account requirements and the capital financing 
requirement, in lieu of future borrowing for capital purposes. The strategy adopted 
considers interest rate forecasts, the management of carrying costs and the retention 
of cash balances at appropriate levels, whilst managing the associated investment, 
interest, and liquidity risk. 
2.4 The Council made a successful application to the PWLB to access the certainty rate 
which allows a 20-basis point (bps) (0.20%) discount on loans from the PWLB under 
the prudential borrowing regime. This will continue to provide the Council with an 
opportunity to borrow from the PWLB at more beneficial rates until 30 April 2025. 
2.5 A new PWLB HRA rate, which is 0.4% below the certainty rate, has been available from 
15th June 2023, which will now be available until June 2025, to support local authorities 
borrowing for Housing capital purposes or refinancing existing loans. In conjunction 
with our treasury advisors, we continue to review borrowing requirements and assess 
borrowing opportunities for the Council during 2024/25.
Page 108 of 218

Page 109

2.6 The CIPFA Prudential Code stipulates that local authorities cannot borrow to invest 
primarily for financial return, deeming it imprudent to make investment or spending 
decisions which will increase the capital financing requirement resulting in new 
borrowing, unless it is directly and primarily related to the functions of the Council. The 
Council is compliant with this requirement.  Members should note also that PWLB loans 
are no longer available to local authorities planning to buy investment assets primarily 
for yield. 
2.7 Members will be aware interest rates have risen significantly over the past 2 years, 
increasing materially the cost of both short and long-term borrowing. In this quarter, the 
Bank of England reduced the base rate to 5.00% in August. It should be noted that the 
Council’s cost of short-term borrowing reduced slightly during the quarter as whilst the 
cost of short-term borrowing from other local authorities spiked to around 7% in late 
March 2024, primarily due a dearth of local authority lending/borrowing activity during 
the month, as expected shorter-term rates reverted to a more normal range and were 
generally around 5.00% to 5.25% through the quarter. The average rate on the 
Council’s short-term loans at 30th September 2024 was 5.15%. 
2.8 After substantial rises in interest rates since 2021 many central banks have now begun 
to reduce rates, albeit slowly. Gilt yields were volatile over the period and reduced 
slightly between June and September 2024. Much of the downward pressure from 
lower inflation figures was counteracted by upward pressure from positive economic 
data. Data from the US continues to impact global bond markets including UK gilt yields. 
The PWLB certainty rate for 10-year maturity loans was 5.02% at the beginning of the 
quarter and 4.79% percent at the end. The lowest available 10-year maturity rate during 
the quarter was 4.52% and the highest was 5.06%. Rates for 20-year maturity loans 
ranged from 5.01% to 5.47% during the quarter, and 50-year maturity loans from 4.88% 
to 5.29%. 
Debt Restructuring 
2.9 In conjunction with our Treasury advisors, we monitored the economic climate in 
relation to our financial targets and Treasury Management Strategy, for the quarter 
under review. The interest rates prevailing throughout the period resulted in no 
beneficial opportunities for debt restructuring/rescheduling of the existing PWLB debt 
portfolio arising. 
2.10 The Council continues to hold £3.0m of LOBO (Lender’s Option Borrower’s Option) 
loans where the lender has the option to propose an increase in the interest rate at set 
dates, following which the Authority has the option to either accept the new rate or to 
repay the loan at no additional cost.  The rise in market interest rates increases the 
probability of LOBOs being called, however, no lender exercised their option during the 
quarter.    
2.11 Further reports regarding future activity will be presented to Committee as appropriate. 
Investments  
2.12 Treasury management investments arise from cash flows or treasury risk management 
activity, that results in balances being invested, until the cash is required for use in the 
course of business. 
2.13 At the end of the second quarter of 2024/25, the Council held total investments of 
£51.7m, which is a net increase of £18.3m in cash and cash equivalents, primarily due
Page 109 of 218

Page 110

to a £14.7m increase in short-term investments, reflecting maturing temporary 
investments of approximately £305.8m, and undertaking new short-term investments 
of £320.5m, and a reduction in uncleared balances due to timing differences including 
cash in transit of £3.7m. See summary at Appendix 1, column 6. 
2.14 At quarter end, the uncleared balances including cash in transit was £4.5m which is a 
net deficit position, a reduction of £3.7m compared to the position reported at the end 
of the previous quarter of £8.1m. The positive net cash movement primarily reflects a 
decrease in the value of BACS creditor payment runs compared with the previous 
period. The balance at 30 September 2024 comprises £4.5m of net BACS credits 
outstanding due for clearance within 3 days of the quarter end date, cash in transit 
balance of £0.2m, partly offset by cheques unpresented of £0.2m. 
2.15 In line with the approved strategy to manage liquidity, the Council aims to maintain a 
minimum balance of £30.0m available on an overnight basis (instant access), ensuring 
a prudent level of funds is maintained to meet all service requirements. 
2.16 During the quarter, the MPC voted to reduce the Bank of England base rate by 0.25% 
to 5.00%.  This reduction of the base rate over the period under review, resulted in 
short-dated cash rates also reducing, with rates ranging between 5.14% at the 
beginning of July to 4.88% at the end of September, a reduction of 0.26% for 
overnight/7-day maturities. There is little noticeable difference between the 7 day and 
1-month SONIA (Sterling Overnight Rate) bid rates and generally available investment 
rates offered by financial institutions and money market funds. Despite this, the Council 
will endeavour to achieve good performance levels in investment activity. 
2.17 Overall the Treasury Management team continues to take a prudent approach to 
investing surplus funds in line with the approved 2024/25 Investment Strategy. Security 
of investment followed by ensuring sufficient liquidity are key investment criteria 
governing Council investment decisions. This approach is aligned to the prudent 
management of liquidity to meet current commitments and future cash demands based 
on the latest cashflow projections.  During the quarter, the rates on DMADF deposits 
ranged between 4.94% and 5.19% and money market rates between 4.90% and 
5.21%. 
2.18 However, as demonstrated by the liability benchmark reported at (xi) below and 
Appendix 3 attached, it is anticipated the Council will be a long-term borrower and 
therefore new treasury investments are primarily made to manage day-to-day cash 
flows using short-term low risk instruments. The existing portfolio of strategic pooled 
funds will be maintained to diversify risk into different sectors and boost investment 
income. 
Non-Treasury Management Investments   
2.19 During the quarter, no repayments were made in respect of third-party advances in 
connection with the Cumbernauld Academy DBFM and Greenfaulds DBFM.  
Interest Rate Movements & Other Economic Updates 
2.20 As outlined by our treasury management advisors, UK headline consumer price 
inflation remained around the Bank of England (BoE) target later in the period, falling 
from an annual rate of 3.2% in March to 2.0% in May and then rebounding marginally 
to 2.2% in July and August, as was expected, due to base effects from energy prices. 
Core and services price inflation remained higher at 3.6% and 5.6% respectively in 
August.
Page 110 of 218

Page 111

2.21 The UK economy continued to expand over the period, albeit slowing from the 0.7% 
gain in the first calendar quarter to 0.5% (downwardly revised from 0.6%) in the second 
and 0.3% in the third. Of the monthly figures, the economy was estimated to have 
registered no growth in July, with growth of 0.2% in August. 
2.22 Labour market data was slightly better from a policymaker perspective, showing an 
easing in the tightness of the job market, with inactivity rates and vacancies declining. 
However, a degree of uncertainty remains given ongoing issues around the data 
collected for the labour force survey by the Office for National Statistics. Figures for the 
three months to July showed the unemployment rate fell to 4.1% (3mth/year) from 4.4% 
in the previous three-month period while the employment rate rose to 74.8% from 
74.3%.  Over the same period average regular earnings (excluding bonuses) was 
5.1%, down from 5.4% in the earlier period, and total earnings (including bonuses) was 
4.0% (this figure was impacted by one-off payments made to NHS staff and civil 
servants in June and July 2023). Adjusting for inflation, real regular pay rose by 2.2% 
in May to July and total pay by 1.1%. 
2.23 With headline inflation lower, the BoE cut base rate from 5.25% to 5.00% at the August 
Monetary Policy Committee (MPC) meeting. The decision was finely balanced, voted 
by a 5-4 majority with four members preferring to hold at 5.25%. At the September MPC 
meeting, committee members voted 8-1 for no change at 5.00%, with the lone dissenter 
preferring base rate to be cut again to 4.75%. The meeting minutes and vote suggested 
a reasonably hawkish tilt to rates, with sticky inflation remaining a concern among 
policymakers. 
2.24 The latest BoE Monetary Policy Report, published in August, showed policymakers 
expected GDP growth to continue expanding during 2024 before falling back and 
moderating from 2025 to 2027. Unemployment was forecast to stay around 4.5% while 
inflation was shown picking up in the latter part of 2024 as the previous years’ energy 
price declines fell out of the figures before slipping below the 2% target in 2025 and 
remaining there until early 2027. 
2.25 Our treasury management advisors maintain its central view that base rate would 
steadily fall from the 5.25% peak, with the first cut in August being followed by a series 
of further cuts, with November 2024 the likely next one, taking base rate down to around 
3% by the end of 2025. 
2.26 In global terms, the US Federal Reserve also cut interest rates during the period, 
reducing the Federal Funds Rate by 0.50% to a range of 4.75%-5.00% at its policy 
meeting in September. Their forecasts released at the same time suggested a further 
1.00% of easing is expected by the end of the calendar year, followed by the same 
amount in 2025 and then a final 0.50% of cuts during 2026. Having first reduced interest 
rates in June, the European Central Bank (ECB) held steady in July before cutting 
again in September, reducing its main refinancing rate to 3.65%. Unlike the US Federal 
Reserve, the ECB has not outlined a likely future path of rates, but inflation projections 
remain in line with the central bank’s previous forecasts where it will remain above its 
2% target until 2026 on an annual basis. 
2.27 Sentiment in financial markets continued to mostly improve over the period, but the 
ongoing trend of bond yield volatility remained. The general upward trend in yields in 
the early part of the year was reversed in the later part, and yields ended not too far 
from where they started. However, the volatility in response to economic, financial and 
geopolitical issues meant it was a bumpy ride for bond investors during that time. 
Page 111 of 218

Page 112

2.28 Over the period, the 10-year UK benchmark gilt yield started at 4.18% and ended at 
4.00% but hit a high of 4.29% in early July and a low of 3.76% in mid-September. While 
the 20-year gilt started at 4.61% and ended at 4.51% but hit a high of 4.73% in early July 
and a low of 4.27% in mid-September. The Sterling Overnight Rate (SONIA) averaged 
5.03% over the period to 30th September.   
2.29 Due to holding of the base rate during the period, short-term borrowing interest rates 
stabilised with the short term 7-day offer rate ranging between 5.06% and 5.34% over 
the period. Taking account of the increase in borrowing rates and advice from our 
treasury management advisors, it was considered more cost effective in the near term 
to use a combination of internal resources or to borrow rolling temporary / short-term 
loans at lower interest rates where possible rather than long term borrowing. This will 
result in increased temporary borrowing costs for the Council partially offset by increased 
investment income earned on surplus balances. 
2.30 The Treasury Management Section will continue to monitor financial and economic policy 
and their impact upon the Council’s investment and borrowing activity. 
The Prudential Code for Capital Finance in Local Authorities 
2.31 The Local Government in Scotland Act 2003 requires the Council to undertake its 
Treasury activities in line with the Prudential Code for Capital Finance in Local 
Authorities. 
2.32 Committee, at its meeting on 28 February 2024, approved a report titled, “Treasury 
Management Strategy 2024/2025 and Treasury and Prudential Indicators 2024/2025 to 
2028/2029”. This report detailed a variety of mandatory and local indicators aimed at 
assisting members to determine that proposed capital investment levels and treasury 
management decisions satisfied the key requirements of affordability, prudence and 
sustainability. Performance against key prudential indicators for 2024/25 to date is 
detailed within Appendix 2. 
(i) Indicator 1(a) illustrates planned investment on capital expenditure is forecast to
be lower than initially anticipated by £63.8m in 2024/25. This reflects a reduction
of £19.3m in the General Fund capital investment and £44.5m for the HRA
Mainstream and New Build programmes.  For further information, this is monitored
in detail as part of the Council's capital programme reporting mechanisms which
will provide spend details including any revisions to the estimates approved in
2024/25. 
(ii) The mix of resources required to finance the capital expenditure in 2024/25 reflects
the updates on forecast capital investment. Therefore, the level of in-year
borrowing is anticipated to be lower by £75.3m due to a reduction in General Fund
programme requirements of £49.0m and £26.3m for HRA programme. This
forecast level of borrowing also reflects a net decrease in capital grants and
external contributions of £14.6m with decreased funds available to HRA
programmes of £18.3m partly offset by an increase in General Fund of £3.7m. An
increase of £24.4m of CFCR is also anticipated, primarily due to an increase in
General Fund related to one-off savings in pension costs in 2024/25 being utilised
for capital investment, and an increase in capital receipts of £1.6m. 
(iii) As a result of accounting issues arising from the pandemic recovery, the
implementation of IFRS 16 Lease Accounting was further delayed. Therefore, a
restatement of existing liabilities for operating leases to the credit arrangement
category will be implemented in 2024/25 with an estimated impact of £2.2m. In
Page 112 of 218

Page 113

addition, subsequent impact of IFRS16 implementation on Service Concessions
liabilities in 2024/25, is estimated to result in capital investment of £93.9m being
recognised in the period to 2028/29.  It should be noted that this does not represent
cash expenditure and is offset by recognition of associated credit arrangements
financing. 
(iv) Indicator 1(b) – The Council’s cumulative outstanding amount of debt finance is
measured by the capital financing requirement (CFR). The CFR is essentially a
measure of Council’s underlying borrowing need i.e. capital expenditure not
resourced by capital grants, receipts or CFCR, with any new borrowing increasing
the CFR. The CFR is projected to rise to £1,591.4m within the financial year as at
30 September 2024. 
(v) The Prudential Code requires the Council’s capital investment to be prudent and
affordable. To demonstrate this, a Prudential Margin (the need to borrow versus
actual borrowing) is calculated. Indicator 1(c) demonstrates a healthy prudential
margin of £262.8m estimated as at 30 September 2024. The timing and profile of
external borrowing to replenish cash reserves and balances are being managed,
giving full consideration to liquidity, interest rate and refinancing risk, whilst
minimising the potential carrying costs. 
(vi) Indicator 1(d) illustrates that both the overall Authorised Limit and Operational
Boundary limits for borrowing and long-term liabilities have not been exceeded,
with the maximum borrowing undertaken within the period being well below the
approved boundaries. 
(vii) Indicator 1(e) illustrates the financing costs forecasts as at 30 September 2024 for
both general fund and HRA as a proportion of net revenue stream. Although capital
expenditure is not charged directly to revenue, interest payable on loans, and loan
fund and long-term liability repayments are.  The net annual charge is known as
financing costs; this is compared to the net revenue stream i.e. the amount funded
from Council Tax, NDR and government grants. 
(viii) Indicator 2(a) highlights the proportion of external interest payable by the Council
which is fixed and variable over the term of the borrowing, and therefore the
exposure to the effects of interest rate changes. As at 30 September 2024, the
level of borrowing subject to variability is deemed to be within acceptable levels. 
(ix) Indicator 2(b) highlights a projected increase in loan charges of £2.0m compared
to the initial Treasury Management Strategy estimates for 2024/25. This projection
takes into account treasury management activity, internal Interest on Revenue
Balances (IORB) recharges due to increased market interest rates, the loans fund
holiday flexibility adopted in 2022/23 and decisions of the Policy and Strategy
Committee and the Strategic Capital Delivery Group to approve and reprofile the
new capital programme for the period 2024/25 to 2028/29 based on current
programme delivery plans. However, it should be noted that due to significant
uncertainty and volatility within market conditions that there is a material risk of
movement in applicable interest rates impacting IORB recharges.  When applied
to the high levels of balances held by the Council, this could lead to a significant
movement in the level of financing costs expected.  A review has been undertaken
to model the potential impact of any changes and has been incorporated within this
report and will continue to be reviewed throughout the year with further updates to
be provided to members in future reports. This current loan charge variance is
made up of: 
Page 113 of 218

Page 114

• A net treasury management interest and expenses overspend of £2.3m is
projected (£0.6m General Fund, HRA £1.7m), which is a primarily a reflection
of increased internal IORB charges, and incorporates cashflow management
techniques adopted, e.g. directing the timing of new borrowing, managing
investment security, liquidity and interest rate risk. 
• In 2024/25 it is anticipated there will be a minor reduction in anticipated loans
fund advance repayments of £0.3m (£0.2m General Fund, HRA £0.1m). This
is primarily due to revised average loan pool rates from previously forecast. 
(x) Indicator 2(c) relates to the level of fixed debt due to mature within time periods. 
The level of debt maturing remains within the upper limits set for each category at
the beginning of the financial year. 
(xi) The Liability Benchmark at Appendix 3 is a new indicator.  The Treasury
Management Code states that organisations should evaluate the amount, timing
and maturities needed for new borrowing in relation to planned borrowing needs,
in order to avoid borrowing too much, too little, too long or too short. The liability
benchmark is an important tool to help establish whether the Council is likely to be
a long-term borrower or long-term investor in the future, and so shapes its strategic
focus and decision making. Essentially this benchmark identifies the projection of
external debt/borrowing required over the long term to fund approved revenue &
capital budgets, while keeping treasury investments at the minimum level required
to manage day-to-day cash. 
(xii) This represents the comparison of the Council’s actual borrowing against an
alternative strategy. This utilises the forecasts for Capital Financing Requirement,
long-term liabilities, current external borrowing, balance sheet resources i.e.
reserves, and that cash and investment balances are kept to a minimum of £30.0m
at each year-end to maintain sufficient liquidity but minimise credit risk. 
(xiii) The Loans CFR (solid light blue) represents the total cost of the capital expenditure
plans based on the estimated current profile of the 5-year Capital Programme
2024/2025 to 2028/2029 as approved by Policy & Strategy Committee on 14th
March 2024.  This reduces over time as scheduled principal repayments are made
to the loans fund. The Net Loans Requirement (dotted red line) represents the
minimum external borrowing required to fund the current capital expenditure plans
assuming all cash reserves and balances are utilised to offset borrowing
requirements.  The Liability Benchmark (solid red line) represents the estimated
borrowing required, taken account of liquidity allowance required of £30.0m to be
held to maintain liquidity and to manage day-to-day cashflows. 
(xiv) The solid grey section shows the maturity profile of current borrowing.  The gap
between the grey section and the liability benchmark line represents the estimated
31/3/24
Actual
£m
31/3/25
Forecast
£m
31/3/26
Forecast
£m
31/3/27
Forecast
£m
31/3/28
Forecast
£m
31/3/29
Forecast
£m
Loans CFR 1,175.8 1,292.7 1,522.0 1,736.5 1,876.7 2,027.6
less Balance Sheet Resources (369.5) (344.5) (312.7) (295.8) (236.8) (224.0)
Net Loans Requirement 806.3 948.2 1,209.3 1,440.6 1,639.9 1,803.6
plus: Liquidity Allowance 30.0 30.0 30.0 30.0 30.0 30.0
Liability Benchmark 836.3 978.2 1,239.3 1,470.6 1,669.9 1,833.6
Existing Borrowing 866.9 746.1 553.7 512.6 478.2 448.0
New Borrowing Required 0.0 232.1 685.6 958.0 1,191.7 1,385.5
Page 114 of 218

Page 115

additional borrowing that is forecast will be required to fund the current capital
expenditure plans, via long-term and short-term borrowing options. 
3. Measures of success 
3.1  Overall the approach adopted by the Council’s Treasury Management team during the
quarter under review met the key requirements of the 2024/25 Treasury Management
Strategy. Prudential indicators have remained in accordance with those approved by
Committee on 28 February 2024. The projected final outturn illustrates a healthy
prudential margin and borrowing levels that are below sustainable limits, ensuring that
the projected capital investment levels remain affordable and sustainable. However,
the current financial volatility and increased borrowing costs has resulted in an
assessment being undertaken of the potential impact on future years of the current
capital programme.  This will continue to be monitored to determine if any further review
of the programme is required to ensure that it remains sustainably affordable. 
4. Supporting documentation 
Appendix 1:  Loans, Long term Liabilities & Investments as at 30 September 2024 
Appendix 2:  Summary of Treasury and Prudential Indicators as at quarter ended 30   
September 2024 
Appendix 3: Liability Benchmark as at quarter ended 30 September 2024 
Elaine Kemp
Chief Officer (Finance) 
Page 115 of 218

Page 116

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Financial impacts are outlined within the report.
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 116 of 218

Page 117

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
As the Council borrows and invests significant sums of money it is exposed to
financial risks including the loss of invested funds and the revenue effect of
changing interest rates. Therefore, successful identification, monitoring and control
of risk remains central to the Council’s treasury management strategy. 
Treasury Management activity by its very nature has a number of inherent risks
including interest rate, liquidity and refinancing risks. To minimise risk for its
treasury management activities the Council adopts and operates in accordance
with the guidelines for best practice prescribed within the CIPFA “Treasury
Management in the Public Services” Code of Practice and the CIPFA Prudential
Code for Capital Finance in Local Authorities. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
Page 117 of 218

Page 118

5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 118 of 218

Page 119

LOANS, LONG TERM LIABILITIES & INVESTMENTS AS AT 30 SEPTEMBER 2024                                                              Appendix 1
DEBT RESTRUCTURING   
BALANCE       
1-July-24
EARLY
REDEMPTION REFINANCING
NEW
BORROWING /
LONG-TERM
LIABILITIES
PRINCIPAL
REPAYMENTS
NET CASH
MOVEMENTS
BALANCE
30-September-24
(1) (2) (3) (4) (5) (6) (7)
LONG-TERM LOANS
PWLB 564,709,637 0 0 0 (16,735,005) (16,735,005) 547,974,632
MONEY MARKET LOANS 54,000,000 0 0 0 0 0 54,000,000
LOBO 3,000,000 0 0 0 0 0 3,000,000
ENERGY EFFICIENCY LOAN 631,571 0 0 0 (26,023) (26,023) 605,548
622,341,208.14 0 0 0 (16,761,028) (16,761,028) 605,580,180.00
SHORT-TERM LOANS
TEMPORARY 233,500,000 0 0 85,500,000 (80,000,000) 5,500,000 239,000,000
MUNICIPAL BANK 0 0 0 0 0 0 0
INTERNAL LOANS 6,280 0 0 0 0 0 6,280
233,506,280 0 0 85,500,000 (80,000,000) 5,500,000 239,006,280
LONG -TERM LIABILITIES
FINANCE LEASE OBLIGATIONS 1,055,925 0 0 0 0 0 1,055,925
LONG TERM LIABILITY 205,410,993 0 0 0 (1,992,769) (1,992,769) 203,418,224
206,466,918 0 0 0 (1,992,769) (1,992,769) 204,474,148
TOTAL EXTERNAL DEBT 1,062,314,406 0 0 85,500,000 (98,753,797) (13,253,797) 1,049,060,608
INVESTMENTS
THIRD PARTY ADVANCES 1,146,829.39 0 0 0 0 0 1,146,829
BANKS & OTHER FINANCIAL INSTITUTIONS 40,348,023.85 0 0 0 0 14,642,039 54,990,063
UNCLEARED BALANCES INCL CASH IN TRANSIT (8,118,919) 0 0 0 0 3,662,428 (4,456,491)
CASH & CASH EQUIVALENTS 33,375,934 0 0 0 0 18,304,467 51,680,401
NET BORROWING 1,028,938,472 0 0 85,500,000 98,753,797 (31,558,264) 997,380,208
Page 119 of 218

Page 120

Appendix 2 
Summary of Treasury and Prudential Indicators as at quarter ended 31 March 2025
1. Prudential Indicators
(a) Capital Expenditure Initial
Estimate
2024/2025
(£m)
Projected 
Outturn 
2024/2025 
(£m)
Variance
2024/2025
(£m)
Forecast 
2025/2026 
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
Capital Expenditure: General Services 156.5 137.2 (19.3) 187.3 139.2 86.6 133.2
Capital Expenditure: HRA 155.8 111.3 (44.5) 166.3 173.6 153.6 131.1
Total spend : Capital Expenditure 312.3 248.5 (63.8) 353.6 312.8 240.2 264.3
Total spend : Credit Arrangement 88.7 88.6 (0.1) 0.3 1.0 2.1 4.1
Total Capital Investment 401.0 337.1 (63.9) 353.9 313.8 242.3 268.4
Financed By:     
Capital Grants & Other External Contributions 72.1 57.5 (14.6) 49.1 44.9 44.6 52.0
Capital from Current Revenue 20.1 44.5 24.4 43.5 20.1 20.1 20.1
Capital receipts 3.3 4.9 1.6 5.0 3.0 1.5 4.0
Capital receipts transfer to Capital Fund 0.0 0.0 0.0 0.0 0.0 0.0 0.0
CFR : Borrowing - General Services 114.8 65.8 (49.0) 126.8 108.4 57.6 94.3
CFR : Borrowing - HRA 102.0 75.7 (26.3) 129.2 136.4 116.4 93.9
Credit Arrangements 88.7 88.6 (0.1) 0.3 1.0 2.1 4.1
(b) Capital Financing Requirement (CFR) Initial
Estimate
2024/2025
(£m)
Projected 
Outturn 
2024/2025 
(£m)
Variance
2024/2025
(£m)
Forecast 
2025/2026 
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
General Services 1,081.8 1,016.2 (65.6) 1,127.7 1,219.7 1,260.1 1,337.7
HRA 603.8 575.2 (28.6) 689.8 809.8 908.1 981.6
Total CFR 1,685.6 1,591.4 (94.2) 1,817.5 2,029.5 2,168.2 2,319.3
Movement in CFR 276.6 182.4 226.1 212.0 138.7 151.1
(c) Gross Debt and the Capital Financing Requirement Initial
Estimate
2024/2025
(£m)
Projected 
Outturn 
2024/2025 
(£m)
Variance
2024/2025
(£m)
Forecast 
2025/2026 
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
Gross Borrowing : Loan Debt 1,147.1 1,034.6 (112.5) 1,295.7 1,526.6 1,726.2 1,896.6
Long-term Liabilites 293.0 294.0 1.0 290.9 288.4 287.0 287.4
Gross Debt 1,440.1 1,328.6 (111.5) 1,586.6 1,815.0 2,013.2 2,184.0
Capital Financing Requirement 1,685.6 1,591.4 (94.2) 1,817.5 2,029.5 2,168.2 2,319.3
Prudential Margin 245.5 262.8 17.3 230.9 214.5 155.0 135.3
Page 120 of 218

Page 121

Appendix 2 (cont) 
Summary of Treasury and Prudential Indicators as at quarter ended 31 March 2025
1. Prudential Indicators
(d) Authorised Limit and Operational Boundary Initial
Authorised
Limit
2024/2025
(£m)
Initial
Operational
Boundary
2024/2025
(£m)
Maximum
Borrowing
Level Q2
2024/2025
(£m)
Borrowing 1,515.0 1,465.0 855.8
Other Long-term Liabilities 340.0 340.0 204.5
Total Debt 1,855.0 1,805.0 1,060.3
(e) Proportion of Financing Costs to Net Revenue Stream
Initial
Estimate
2024/2025
(£m)
Projected 
Outturn 
2024/2025 
(£m)
Variance
2024/2025
(£m)
Forecast 
2025/2026 
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
General Fund Loan Charges 49.8 44.1 (5.7) 46.7 53.6 60.2 64.8
General Fund Finance Lease/PPP Costs 15.3 19.7 4.4 19.3 20.3 20.2 20.7
General Fund : Capital Financing Costs 65.1 63.8 (1.3) 66.0 73.9 80.4 85.5
General Fund : Net Revenue Stream 988.8 990.3 1.5 988.8 988.8 988.8 988.8
Proportion of Financing Costs to Net Revenue Stream - GF 6.6% 6.4% (0.1%) 6.7% 7.5% 8.1% 8.6%
Proportion of Financing Costs to Net Revenue Stream
Initial
Estimate
2024/2025
(£m)
Projected 
Outturn 
2024/2025 
(£m)
Variance
2024/2025
(£m)
Forecast 
2025/2026 
(£m)
Forecast 
2026/2027 
(£m)
Forecast 
2027/2028 
(£m)
Forecast 
2028/2029 
(£m)
HRA Loan Charges 42.8 38.9 (3.9) 42.2 49.2 56.7 64.8
HRA Finance Lease/PPP Costs 0.3 0.3 0.0 0.3 0.3 0.3 0.3
HRA : Capital Financing Costs 43.1 39.2 (3.9) 42.5 49.5 57.0 65.1
HRA : Net Revenue Stream 167.1 160.5 (6.6) 167.1 175.8 186.0 196.3
Proportion of Financing Costs to Net Revenue Stream - HRA 25.8% 24.4% (1.4%) 25.4% 28.2% 30.6% 33.2%
Page 121 of 218

Page 122

Appendix 2 (cont) 
Summary of Treasury and Prudential Indicators as at quarter ended 31 March 2025
2. Treasury Management Indicators
a) Interest Rate Exposures on External Interest Payments Position as at
30/09/2024
(£m) %
External Interest Payable on Fixed Rate Loan Debt 38.5 99.2%
External Interest Payable on Variable Rate Loan Debt 0.3 0.8%
b) Loans Fund Revenue Account Initial
Estimate
2024/2025
(£m)
Projected 
Outturn 
2024/2025 
(£m)
Variance
2024/2025
(£m) %age
Loans Fund Interest Payments 58.2 60.5 (2.3) (4.0%)
Loans Fund Expenses 0.4 0.4 0.0 0.0%
Total Loans Interest Payments & Expenses 58.6 60.9 (2.3) (3.9%)
Loans Funds Investment Income (1.9) (1.9) 0.0 0.0%
Total Loans Fund Interest Payments Investment Income & Expenses 56.7 59.0 (2.3) (4.1%)
Allocated as follows :
Loans Fund Interest Payments Investment Income & Expenses:General Fund 32.4 33.0 (0.6) (1.9%)
Loans Fund Interest Payments Investment Income & Expenses:HRA 24.3 26.0 (1.7) (7.0%)
Capital Advances Repayments -  General Fund 11.3 11.1 0.2 1.8%
Capital Advances Repayments -  HRA 13.0 12.9 0.1 0.8%
Total Capital Advances 24.3 24.0 0.3 1.2%
Total Loan Charges 81.0 83.0 (2.0) (2.5%)
c) Maturity Structure of Borrowing
<12months
12 months to
2 years 2 to 5 years 5 to 10 years
10 to 20
years
20 to 40
years >40 years
Upper Limit maturing :Fixed & Variable Rate Debt 15.0% 15.0% 25.0% 30.0% 35.0% 45.0% 30.0%
Lower Limit maturing :Fixed & Variable Rate Debt 0.0% 0.0% 5.0% 5.0% 5.0% 10.0% 10.0%
Maturity structure at the start of Q2 5.8% 6.0% 16.7% 26.6% 12.9% 27.8% 4.1%
Maturity structure at the end of  Q2 5.9% 7.1% 15.6% 26.1% 13.6% 27.4% 4.3%   
Page 122 of 218

Page 123

Appendix 3 
0
500
1,000
1,500
2,000
2,500
2024 2026 2028 2030 2032 2034 2036 2038 2040 2042 2044 2046 2048 2050 2052 2054
£m
Liability Benchmark - North Lanarkshire
Fixed rate loans LOBO loans Loans CFR Liability benchmark Net loans requirement
Page 123 of 218

Page 124

Page 124 of 218

Page 125

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    EK/KS Date 20/11/24 
2024 Review of Financial Regulations and Scheme of Financial
Delegation 
From  Elaine Kemp, Chief Officer (Finance)  
E-mail KempE@northlan.gov.uk Telephone 07939 280601 
Executive Summary
This report provides Committee with the outcome of the annual review of the Financial
Regulations and Scheme of Financial Delegation.  Full consideration continues to be given
to the collective responsibility for the long-term financial sustainability of the Council and
how the Council’s financial governance arrangements including the Financial Regulations,
and Scheme of Financial Delegation, can further support this.
A number of minor amendments have been made, with two of the main changes
summarised at Appendix 1, and a full amended version of the documents is provided at
appendix 2 and 3. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the revisions made to the Council’s Financial Regulations and Scheme
of Financial Delegation.    
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (25) Ensure intelligent use of data and information to support fully
evidence based decision making and future planning
Programme of Work Statutory / corporate / service requirement
Item 12
Page 125 of 218

Page 126

1. Background 
1.1. This report advises Committee of the outcome of the annual review of the Council’s
Financial Regulations and Scheme of Financial Delegation, noting the main
amendments. 
2. Report 
2.1 The annual review ensures that both the Financial Regulations and Scheme of
Financial Delegation remain appropriate for the effective stewardship of the Council’s
financial resources. 
2.2 A number of minor amendments were made to the Financial Regulations.  These are
highlighted in yellow on Appendix 2, with the two main changes highlighted Appendix
1.  There are no changes to report on the Financial Scheme of Delegation. 
3. Measures of success 
3.1  The Council continues to operate within approved budgeted resources. 
4. Supporting documentation 
Elaine Kemp
Chief Officer (Finance) 
Appendix 1 2024 Financial Regulations and Scheme of Financial Delegation Amendments
Appendix 2 Financial Regulations
Appendix 3 Finance Scheme of Delegation
Page 126 of 218

Page 127

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 127 of 218

Page 128

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 128 of 218

Page 129

Appendix 1
Rationale
Section Section
12.5 No narrative 12.5 Misuse of credit cards will result in action under
the Council’s disciplinary procedures.
Update to include misuse
procedure
14.4 No narrative 14.4 all contract documents are available for inspection
should they be requested.  This should include
sufficient evidence to justify annual price
increases and tables of agreed charges where
appropriate
Update on current creditors
procedure following internal audit
recommendations
2023 Financial Regulations 2024 Financial Regulations
Page 129 of 218

Page 130

Appendix 2 
NORTH LANARKSHIRE COUNCIL 
FINANCIAL REGULATIONS 
APPROVED – 23 May 2018
Updated May 2019 
Updated November 2020
Updated November 2021
Updated November 2022
Updated November 2023
Updated November 2024 
Page 130 of 218

Page 131

NORTH LANARKSHIRE COUNCIL 
FINANCIAL REGULATIONS 
INDEX         
Section Topic Page
1 Introduction 2
2 Responsibilities 2
3 Definitions 3
4 Responsibility for Financial Administration 5
5 Policies and Strategies 7
6 Capital Expenditure 8
7 Revenue Expenditure 10
8 Budgetary Control 11
9 Legality of Expenditure 13
10 Income 14
11 Treasury Management 15
12 Banking 15
13 Payroll 16
14 Payment of Creditors 17
15 Contracts 19
16 Security 20
17 Stores and Inventories 20
18 Insurance 21
19 Accounting Procedures 22
20 Cash Advances – General and Imprest 23
21 Audit 24
22 Members’ Remuneration and Expenses 24
23 Financial Regulations 25 
Page 131 of 218

Page 132

1. INTRODUCTION
1.1 Financial Regulations are an integral part of the Council’s framework of internal financial
controls, which are designed to ensure the effective stewardship of North Lanarkshire
Council funds. Compliance with these regulations will ensure that public money is
safeguarded and properly accounted for, and all Council financial transactions undertaken
in a manner which demonstrates openness, transparency and integrity.
1.2 The Financial Regulations forms a key part of the overarching Financial Strategy and the
corporate governance arrangements of the Council.
1.3 Any breach or non-compliance with these Regulations must be reported immediately to the
Chief Officer (Finance) who may consult the Chief Executive and/or the appropriate Service
Chief Officer in order to determine the proper action to be taken.  Failure to comply with the
Financial Regulations may result in an investigation and disciplinary action under the
Council’s Discipline Policy
2. RESPONSIBILITIES
2.1 Financial Regulations are the responsibility of all Council employees and should be
distributed annually by the Chief Executive, Deputy Chief Executive, Chief Officers and the
Chief Officer (Finance), highlighting the importance of complying with the regulations and
the Council’s proper financial management.  It is the responsibility of each Chief Officer to
ensure all staff have read and understood the Financial Regulations.  
2.2 In addition, Chief Officers have a responsibility to consult with the Section 95 officer on any
matter affecting their Service which is liable to materially impact the finances of the Council
before making any commitment.  In fulfilling this responsibility, Chief Officers must consider
spending within the context of the Council’s overall financial position.  Appropriate mutual
discussions and collective decisions at Corporate Management Team (CMT) level are
required to manage the overall financial stewardship of the organisation, and should not
focus on an individual Service, Division or Function’s financial requirements.  
2.3 All officers employed by the Council must ensure that all financial transactions are Intra
Vires and in line with these regulations.  
2.4 Adult Health and Social Care – as a result of the Health and Social Care Integration
legislation which came into force on the 1st April 2016, the Council is jointly responsible with
the NHS for the Adult Health and Social Care of service users within North Lanarkshire. The
legislation saw the creation of the North Lanarkshire Integration Joint Board (IJB),
responsible for directing health and social care expenditure within the partnership area.
North Lanarkshire Integrated Joint Board Members include North Lanarkshire councillors,
senior officers in NHS Lanarkshire and stakeholder representatives from across the health
and social care sector. As per the approved IJB Financial Regulations, the Council Section
95 Officer retains the duty to monitor and regulate the financial performance of the Council’s
share of available Board resources. As such, the Section 95 Officer retains the right to
comment and make recommendations to the Board on the suitability of the IJB’s Financial
Regulations. 
2.5 Priority will be given to the IJB’s Financial Regulations first and foremost however where a
situation arises that is not covered within those regulations, employees/members shall refer
to the Council’s Financial Regulations, or where required, obtain guidance from the
Council’s Section 95 Officer to ensure proper financial management.
2.6 At the time of update, consultation is ongoing in respect of Social Care reforms over the
implementation of recommendations made by the Independent Review of Adult Social Care
and the establishment of a National Care Service.  The impact arising from the outcome of
the consultation exercise and any subsequent reforms implemented will be considered as
Page 132 of 218

Page 133

part of future reviews of the Financial Regulations however until such time paragraph 2.5
remains relevant.  
2.7 Arm’s Length External Organisations (ALEOs) are used as an alternative way of delivering
vital council services. This delivery involves the use of public funds therefore the Council
has a statutory duty to demonstrate openness, transparency and accountability regarding
the monies spent through these Arms-length bodies. These financial regulations are not
applicable to arms-length bodies, which are separate legal entities with responsibility for
their own stewardship and governance arrangements. However, to enable the Council to
satisfy its public accountability duties, services must adhere to the Corporate Guidance on
Arms-length bodies, and must ensure all Council relationships with such bodies properly
comply with the principles contained within the Code of Guidance on Following the Public
Pound. It is expected that due cognisance is given to the Council’s approved Financial
Regulations by respective ALEO Board/Management Teams, however it is their
responsibility to ensure proper financial management and the development of appropriate
Financial Regulations. The Section 95 Officer reserves the right to comment on the
appropriateness of ALEO financial management and regulations to the respective
Board/Management Team, as well as the Enterprise and Communities Committee.  
2.8 Community Boards and Participatory Budgeting. A Framework for Working with
Communities was approved by Policy and Strategy Committee in March 2020 which
included the establishment of 9 Community Boards.  It is intended that these boards will
drive and support locality engagement and planning which will partly be achieved through
optimising funding and resource opportunities to deliver and improve services in addition to
supporting the development and implementation of Participatory Budgeting (PB).  This will
allow the community a voice in the decision making process of how money is spent. These
financial regulations set out remain applicable in these arrangements. 
2.9 Where potential ambiguity in the Financial Regulations arises, advice should be sought from
the Council’s Section 95 Officer. The Chief Officer (Finance) will provide advice to ensure
the aims of the guidance is met and that the Council is in full compliance with financial
management requirements. 
3. DEFINITIONS
3.1 The following expressions are used throughout the Regulations with the following
meanings:
3.1.1 Chief Officer
The Chief Executive, Deputy Chief Executive or Chief Officer,
regardless of specific title. This includes the Chief Officer’s
authorised substitute(s), except in cases where it is stated that
substitutes may not act. A Chief Officer may have different
authorised substitutes, depending on the topic.
3.1.2 As delegated Any grant of delegated powers by the Council to such persons as
may be specified from time to time.
3.1.3 By the Section 95
Officer 
By the Section 95 Officer, or under arrangements made by/ or
approved by the Section 95 Officer, a Chief Officer or an external
agency.
3.1.4 Records
All or any records, forms, books, documents, certificates, tickets
or correspondence, whether on paper, on film, on computer file or
any other medium.
Page 133 of 218

Page 134

3.1.5 Authorised
signatories
A Chief Officer may authorise officers within their service to
commit the Council to obtaining goods, services and other items
in respect of which expenditure may competently be incurred.
These officers are known as Authorised Signatories.  The Section
95 Officer will require the Chief Officers to confirm their lists
annually. 
The list shall include specimen signatures, and where appropriate,
specimen initials, persons whose authorisation is applied by some
means other than manuscript, and the manner of their personal
authorisation, and also specify the items which each officer is
authorised to sign, and the financial limit on any one item. 
Any proposed amendment of the list must be notified immediately
to the Section 95 Officer.
3.1.6 Emergency
An actual or potential emergency or disaster involving or likely to
involve any or all of the following:  
i)   Danger to life or health  
ii)  Serious damage to or destruction of property 
iii) Major financial penalties.
3.1.7 Service
In addition to each recognised Council Service, “Service” includes
those limited companies or other organisations which are wholly
owned or controlled by the Council, and which have adopted the
Council’s financial regulations for their own use. 
3.1.8 Capital Expenditure
Expenditure on the acquisition, creation or enhancement of fixed
assets, provided it yields benefit to the Council for more than one
year (reference CIPFA/LASAAC Code of Practice on Local
Authority Accounting and Scottish Government Finance Circular
No. 3/2018). It is the responsibility of officers to ensure
expenditure in the capital programme is ‘capital’ as per proper
accounting practices required by the Local Government Scotland
Act 2003.
The Council has set a de-minimis, for materiality, whereby no
individual item of less than £10,000 will be regarded as Capital.
However due notice should be given to groups of items which fall
below the de-minimis as a single unit but should collectively be
capitalised i.e. laptop refresh programme. It should be noted that
items above the de-minimis are not necessarily capital and
officers should refer to relevant Finance staff for guidance.
3.1.9 Revenue
Expenditure All expenditure which is not Capital.
3.1.10 Virement
A transfer of money between budget headings.  Authorisation
levels are outlined in the Financial Regulations. 
Virements shall not be used to:
• Mask overspend and underspend issues; 
• Apply underspends and over-recoveries of income without
approval by the SCDG and Committee in line with
authorisation levels; or
• Reverse any decision made by the Council during its
budget process unless subsequently approved by Council.
Page 134 of 218

Page 135

3.1.11 Contracts As defined within the General Contract Standing Orders (effective
from 1 January 2020)
3.1.12 Statutory Officer
Officers designated for particular statutory purposes as set out in
legislation: 
• Section 95 Officer, Chief Officer (Finance) 
• Chief Social Worker, Chief Social Work Officer (Children,
Families, Justice and Integrated Practice); and 
• Monitoring Officer, Chief Officer (Legal and Democratic)
3.1.13 Recovery Plan
Robust, affordable and sustainable plans to mitigate known
financials burdens either, on a one-off or a recurring basis,
presented to and agree by Corporate Management Team. 
4. RESPONSIBILITY FOR FINANCIAL ADMINISTRATION
4.1 Council Ultimate authority over decision-making.
4.2 Finance and
Resources  Committee responsible for financial decision-making.
4.3
Enterprise and Fair
Work Committee,
Environment and
Climate Change
Committee,
Housing
Committee,
Regulatory
Committee, and
Finance and
Resources
Committee
Responsibility depending on service nature for the monitoring of
specific ALEOs’ financial, service and operational performance
including risk management and to ensure effective governance is
in place within the ALEOs.
4.4
Section 95 Officer
(Chief Officer
(Finance))
To administer the financial affairs of the authority, as the proper
officer for the purposes of Section 95 of the Local Government
(Scotland) Act 1973, and in accordance with part 7 of the Local
Government in Scotland Act 2003. 
To ensure the Council has put in place suitable arrangements to
ensure compliance with the CIPFA Statement on the role of the
Chief Financial Officer (CFO) in Local Government.
To ensure the Council’s financial management arrangements are
in line with the Council’s strategic policies, plans and objectives.
To ensure all staff involved in financial management across the
Council maintain professional accounting standards and comply
with expected standards of conduct and integrity.
To provide financial advice to the Council and its Committees, and
monitor overall compliance with these Regulations.
To obtain assurance regarding the financial governance
arrangements of subsidiary companies, associate companies and
partnerships which the Council is able to control or influence. 
Page 135 of 218

Page 136

4.5  Chief Officers
To assist the Council and the Chief Executive at all times in
achieving Best Value in the conduct of their service activities.
Chief Officers are fully accountable for the financial performance
of their service area, and must manage, monitor and control
Service budgets in line with the Code of Practice on Local
Authority Accounting and agreed timescales, ensuring compliance
with Contract Standing Orders and Financial Regulations
regarding their service activities.
Except in an emergency, or as Delegated, to consult with the
Section 95 Officer or relevant Business Finance Manager on any
matter affecting their services which is liable to affect materially
the finances of the Council before making any commitment, and
before reporting thereon to a Committee.
To maintain effective stewardship of their Services’ funds,
ensuring that all financial transactions undertaken are within their
powers.
To ensure appropriate management of risks associated with the
delivery of effective financial management inherent in providing
their service activities.
To ensure the relevant Business Finance Manager (or their
assigned deputy) is part of the Service’s Senior Management
Team (SMT) and provide them with the opportunity to attend all
meetings. 
To liaise with the Chief Officer (Finance) or the nominated
representative, regarding any appointments to or changes to the
financial management establishment supporting their service
activity.
4.6 Statutory Officers
The Financial Regulations should be strictly adhered to ensuring
all expenditure incurred is within approved budgets.  These
regulations still apply when making professional judgements while
carrying out a role.  However in the instance that a statutory
officer’s judgement may lead to a breach in the Financial
Regulations, the Section 95 Officer must be notified in the first
instance and the level of breach reported to CMT thereafter with
a Service Recovery plan to manage the additional spend.  
Page 136 of 218

Page 137

4.7  Partner
Organisations
Reflecting the nature of partnership arrangements and the drive
towards Shared Services and possibly pooled budgets, elements
of Council budgets may be delegated or shared with external
organisations. 
Following approval from the Chief Officer (Finance), the Chief
Executive or Chief Officer can delegate budget to an external
organisation, providing the Section 95 Officer is satisfied that
governance arrangements and responsibilities are clearly defined
and that appropriate management controls regarding usage and
monitoring of budget are in place. 
Chief Officers must ensure that all relevant staff are aware of and
adhere to the Corporate Guidance on Arms-length, thereby
ensuring the Council’s relationships with ALEOs comply with the
principles contained within the Code of Guidance on Following the
Public Pound.
This responsibility includes ensuring that the Council is clear as to
the purpose of any financial support provided, that the funding is
used in a manner consistent with good governance principles and
that the Council can demonstrate that the organisation’s
achievements provide best value for that funding support.
4.8 All Officers and
employees
All officers employed by the Council, or by an organisation
associated with the Council, whether or not their financial
statements are consolidated in the Group Accounts of North
Lanarkshire Council, must ensure that all financial transactions
are Intra Vires and are in line with Financial Regulations. 
5. POLICY AND STRATEGIES
There are some areas that require more detailed guidance or procedures.  Although the
specific detail is not included within these Financial Regulations, the expectation is that
officers and Elected Members adhere to the requirements of these additional documents.  
5.1 Financial Strategy
5.1 Financial Strategy sets out the overarching framework for financial
governance, planning and management.  The aim is to ensure
robust, affordable, sustainable and best value financial plans are
developed to support decision making and prioritise the use of
available resources. 
5.2 Revenue Resources
Budget Strategy
The key principles of the Revenue Resources Budget Strategy
were approved by Policy and Strategy Committee in June 2019
and have been subject to annual review. The strategy sets out the
Council’s approach to budgeting and the identification of future
saving ensuring the financial sustainability of the Council and the
safeguarding of public funds.  The strategy is underpinned by the
financial regulations and its principles should be considered in
conjunction with these where appropriate. 
Page 137 of 218

Page 138

5.3 Reserves Policy
In January 2020, Policy and Strategy Committee approved the
Council’s Reserves Policy which sets out the types of reserves
held by the Council and their purpose; establishes procedures for
governance of the reserves; outlines the circumstances for the
utilisation of reserve balances; and outlines the approach taken to
determine the appropriate reserve levels held by the Council.
5.4 Capital Strategy
The Prudential Code for Capital Finance in Local Authorities and
good financial management practice requires Councils to produce
a Capital Strategy. The Capital Strategy ensures the Council takes
capital expenditure and investment decisions in line with the
Council’s priorities, service objectives and properly takes account
of stewardship, value for money, prudence, sustainability and
affordability.
5.5
Treasury
Management
Strategy
The Treasury Management in the Public Services Code of
Practice requires the Council to produce and report Treasury
Management policies, practices and activities on a regular and
ongoing basis. This encompasses the preparation and approval
of an Annual Treasury Management Strategy, which defines the
arrangements for managing the Treasury Management function.
The Strategy covers the Council’s debt and investment
projections; expected movement in interest rates; borrowing and
investment strategies; Treasury Management performance
indicators; and sets specific limits for treasury management
activities. 
6. CAPITAL EXPENDITURE
6.1 Capital Programmes
The Chief Officer (Finance) and the Chief Officer (Enterprise and
Communities) will co-ordinate the Composite and Housing Capital
Programmes respectively in accordance with any Government
requirements as to timescale and the format, for presentation to
the Policy and Strategy Committee, and Council thereafter for
approval.
6.2 Capital Estimates
Once the programmes are approved, and provided that ministers
do not use the powers available to them under s36 of the Local
Government in Scotland Act 2003 to control capital expenditure
limits, the figures for the first year of the Programmes become the
official Capital Estimates for that year, reflecting committed
projects and approved new projects.  They will also include any
preliminary expenses, design costs and land purchases, which
are necessary prerequisites to projects included in year two of the
Programmes.
Page 138 of 218

Page 139

6.3 Preparation
With respect to the Composite Programme, the Strategic Capital
Delivery Group (SCDG) shall provide all the information, in
accordance with a timetable set by, and in a form determined by,
the Chief Officer (Finance) when developing the Council’s Capital
Programme. 
Development of the programme is devolved to the Strategic
Capital Delivery Group, in line with its Terms of Reference.
Approval of the programme is required from the Council’s Section
95 Officer prior to consideration by Council.
6.4 Right to proceed
After Council approval, subject to any further consents required,
and subject to all other requirements of the Financial Regulations
and Contract Standing Orders, Chief Officers may proceed with
projects contained in the Estimates, unless:
(i) the tender cost or revised estimate exceeds the provision 
in the estimate, or
(ii) the nature of the project has changed substantially from 
that originally envisaged.
In either case, approval must be sought from the SCDG, and will
be granted only if the expenditure can be contained within the
overall programme. Approval for adjustments in respect of the
above must be reported to individual Service Committees and the
Policy & Strategy Committee, subject to the approved limits set
out in the SCDG Terms of Reference.
6.5 Acceleration
Projects contained within years 2-5 of the Programme can be
introduced into the current year if they can be contained within the
total resources only on the recommendation of the SCDG, in line
with their Terms of Reference. 
6.6  Additional Projects
Additional projects that are over and above the allocations
approved in the Council’s five year capital programme require
specific consent in the first instance from the Chief Officer
(Finance) and approval by the Policy and Strategy Committee.
6.6 Duty regarding
Approvals
The spending Chief Officer (the Budget Holder) must ensure that
all necessary approvals have been obtained before commencing
any project.
6.7 Revenue Effects
Each Chief Officer, when making proposals on any capital project
shall include a report, agreed with the Chief Officer (Finance),
showing details of the revenue consequences (costs or savings)
in the current and subsequent years, ensuring they are managed.
6.8 Deviations
Each Chief Officer (Budget Holder) must draw to the attention of
the SCDG and the Spending Committee, in consultation with the
Section 95 Officer any circumstance that may lead to a significant
deviation from the approved Capital Estimates, either in
expenditure or in income. In this context significant means
£100,000 or 5%, whichever is the higher, of the Policy &
Resources approved programme expenditure. The SCDG should
authorise action designed to rectify the situation, and if they are
unable to do so, the Chief Officer (Finance) must report the facts
to the Spending Committee and the Finance and Resources
Committee for consideration.                                                             
Page 139 of 218

Page 140

6.9 Agents
Where an agent of any service, including a contractor, Council-
controlled Company or Trust, identifies the probability of a
significant deviation occurring, the agent is required to report the
fact, including reasons for this deviation, to the appropriate Chief
Officer (Budget Holder) immediately. 
7. REVENUE EXPENDITURE
7.1 Policy Guidelines
The Section 95 Officer will advise the Chief Officers of the
Guidelines and timetable for preparing the annual revenue budget
estimates.
7.2 Budget Estimates
The Chief Officer (Finance) will co-ordinate the preparation of the
annual Estimates of Income and Expenditure in accordance with
the Guidelines, ensuring compliance with the Council’s priorities
and targets within that planning time frame.
7.3 Preparation
Chief Officers will supply all necessary information to the Chief
Officer (Finance), in accordance with a timetable set by and in a
form determined by the Section 95 Officer, regarding the
requirements of their services. Where relevant, such information
will be supported by equality impact assessments.
7.4 Authorisation
The Revenue Budget Estimates will be submitted to Council for
approval, together with recommendations as to the levels of
Council Tax for the coming year.
7.5 Right to Proceed
After the Revenue Budget Estimates are approved, Chief Officers
may proceed to incur that expenditure, subject to the contractual
provisions of the Standing Orders and Financial Regulations and
any other legal requirements in respect of contracts, except where
any item has been specifically identified as requiring further
Committee consideration and approval.
7.6 Further approval
Any proposals requiring Committee approval must include a report
from the Chief Executive or spending Chief Officers, agreed by the
Chief Officer (Finance), stating whether there is adequate
provision in the Revenue Budget Estimates or not.
7.7 Additional Items
Expenditure not included in, or in excess of, the Revenue Budget
Estimates, or income reduced from that included in the Revenue
Budget Estimates, may be authorised in the following
circumstances only:-
(i) Where a Supplementary Estimate/budget has been 
approved by both the Spending Committee and Finance 
and Resources Committee, on receipt of a report from the
Chief Officer (Finance) including details of any implications for
policy or future years' spending; or
(ii) In an emergency, where powers have been specifically 
delegated to officers for Building Control or Environmental 
Health (Food Safety) purposes, or with the approval of the 
Spending Committee and the Finance and Resources
Committee as soon as possible thereafter,  or
(iii) Where adjustments to the budget have been approved in 
accordance with the provisions of these Regulations.
Page 140 of 218

Page 141

7.8 Contingency Sum
Where a Contingency Sum has been included in the Revenue
Estimates, draws on the Contingency must be authorised by the
Finance and Resource Committee, on the recommendation of the
Section 95 Officer, except in an emergency situation when they
may be authorised by the Chief Officer (Finance) in consultation
with the Convenor of the Finance and Resources Committee. The
facts are to be reported to the Finance and Resources Committee
as soon as possible thereafter. 
8. BUDGETARY CONTROL
8.1 Information
The Section 95 Officer will establish a reporting template which
each Chief Officer shall use to compile both their Capital and
Revenue Budget Monitoring reports. 
The reports will detail actual and projected expenditure and
income against year to date and annual budgets. The contents of
the report must be confirmed by the Chief Officer (Finance) and
submitted to the appropriate committee at each cycle. 
The Section 95 Officer will also present an overall summary of the
council’s budgetary position regarding Capital and Revenue
expenditure to the Finance and Resources Committee.
8.2 Control
Each Chief Officer must ensure that sums provided in the budget,
whether revenue or capital, are not exceeded, and that all
expenditure conforms to requirements of the Standing Orders and
of these Regulations.
No Chief Officer or official may incur expenditure unless:
(a) It is a capital expense approved in line with the SCDG 
Terms of Reference;
(b) It is a revenue expense approved as part of the revenue 
budget under 5.4 of these Regulations;
(c) The expense has been authorised as supplementary 
through one of the mechanisms outlined in paragraph 5.7 
of these Regulations.
Any official proposing to incur revenue or capital spending which
is not included within approved budgets must seek approval for a
supplementary budget before incurring such expenditure.
8.3 Deviations
Each Chief Officer (Budget Holder) must draw to the attention of
the Spending Committee, in consultation with the Chief Officer
(Finance), any circumstance that may lead to a significant
deviation from the agreed subjective headings used for budget
monitoring purposes, either in expenditure or in income. In this
context significant means £100,000 or 5%, whichever is the
higher, at divisional summary subjective account code level. 
Services must clearly outline the action required to rectify
significant deviations and where relevant, must also highlight the
impact this has on other budget headings. The Committee must
authorise action designed to rectify the matter, and if they are
unable to do so the Section 95 Officer must report the facts to the
Finance and Resource Committee for consideration.
Page 141 of 218

Page 142

8.4 Virement
A Chief Officer may transfer money between approved Capital &
Revenue expenditure budgets, but must ensure the nature of such
transfers is clearly outlined in monitoring and committee reports,
where applicable. The rules for virement of Revenue budgets
apply to transfers at divisional summary subjective account code
level e.g. Environment & Estates division property costs.  The
rules are as follows: 
8.4a Revenue Virement
Must comply with the definition of a virement as per Section
3.1.10. 
i) Up to £50,000 in consultation & agreement with both the
Chief Officer and Section 95 Officer;
ii) £50,001-£100,000 following consultation & agreement
with the appropriate Convenor and thereafter with the
agreement of the Section 95 Officer;
iii) Over £100,000 on the recommendation of the Spending
Committee, and following notification to the Section 95
Officer, either in the form of a specific report to that
Committee or requested within Budget Monitoring reports;
iv) For Educational Establishments under Devolved School
Management, the notes for virement are laid down in their
schemes of delegation;
v) The Chief Officer (Enterprise and Communities) may
transfer either £100,000 or up to 20% (whichever is higher)
of the total Repairs Budget between Repairs Budget
headings without recourse to Committee;
vi) Regardless of purpose, budget transfers which impact a
future year or years require the approval of the Policy and
Strategy Committee.
8.4b Capital Virement
Capital Virements will be made in line with the SCDG Terms of
Reference, in conjunction with the Chief Officer (Finance). 
Where this ceases to be the case, capital virements should match
the requirements outlined in Section 8.4a (Revenue Virement).
Virements will be classed as those reported at project level, as
outlined in the Councils Composite 5 Year Capital Programme
approved at Policy and Strategy Committee on the 14th March
2024 (updated for Committee annually).
8.5
Inter-Service
Recharges
(Revenue)
Clear documentary justification should be available to the budget
holder to support and substantiate any service recharges.
Inter-Service Recharges should not be treated as External Income
and should utilise a relevant Internal Recharge code. Where
required, guidance should be sought from Finance staff. 
8.6 Inter-Service
Recharges (Capital)
Clear documentary justification should be available to the budget
holder to support and substantiate any service recharges.
Chief Officers must also ensure that any recharges to capital are
in line with capital guidance/code as outlined in these Financial
Regulations.
Where Inter-service recharges to capital do not meet the definition
of capital these must be funded through revenue sources. 
Page 142 of 218

Page 143

9. LEGALITY OF EXPENDITURE
9.1 Legality of
Expenditure
Chief Officer must ensure that any proposed expenditure is within
the legal powers of the Council.  If in doubt, the Monitoring Officer
– Chief Officer (Legal and Democratic) – should be consulted. 
10. INCOME
10.1 Setting of Charges
With the exception of charges imposed by Law and those which
are deemed the responsibility of the Council’s Charitable Trusts,
all alterations to charges require advance approval of the relevant
Committee. 
10.2 Review of Charges
All Chief Officers shall review their service charges annually in the
light of inflation and report the outcome of the review to the Chief
Executive and the Section 95 Officer.  In line with the principles of
the Revenue Budget Strategy, where possible Chief Officers
should aim for full cost recovery. 
10.3 Debtors Control
Each Chief Officer shall make arrangements for the issue and
follow-up of accounts and the collection, control and banking of all
monies due to the Council.
10.4 Notification of
Income
Chief Officers will provide prompt and full particulars of charges
made for work, supplies, goods or services, or other sums due to
the Council to, and in a form approved by, the Chief Officer
(Finance), to ensure the proper recording and prompt collection
by them, or under arrangements approved by them, of all monies
due.
10.5 Write-offs
Any proposal to write off sums due to the Council requires the
following approvals:
(i) For individual sums of less than £500, the relevant Chief
Officers and the Chief Officer (Finance), with an annual report
to the Finance and Resources Committee for information;
(ii) For individual sums of £500 or over, the Spending Committee
and the Finance and Resources Committee.
10.6 Money Collection
All monies collected in any service must be recorded and
deposited, without delay, with the Section 95 Officer or in a Bank
in accordance with their instructions.  No deductions may be made
from income without the specific authorisation of the Chief Officer
(Finance).
10.7 Personal cheques Personal cheques will not be cashed out of monies held on behalf
of the Council.
10.8 Grants
Where appropriate, the Section 95 Officer shall be advised of all
relevant information necessary to allow the submission of all
applications for Grants due to the Council.  Where applications are
submitted directly by the Chief Executive or Chief Officers, they
shall be responsible for their timeous and accurate submission.
Where Chief Officers, and those with devolved responsibility, are
responsible for grant submissions, they are required to advise and
provide evidence to relevant Finance staff of the grant application. 
Page 143 of 218

Page 144

10.9 Controlled
Stationery
All receipt forms, books, tickets and other such items shall be
ordered and supplied to services by the Section 95 Officer, or by
arrangements approved by them.
10.10 Transfer of Money All such transfers between staff will be evidenced in the records
of the Services concerned by the signature of the receiving officer. 
11. TREASURY MANAGEMENT
11.1 CIPFA Code of
Practice
The Section 95 Officer – Chief Officer (Finance) - to ensure the
Council adopts the key clauses within Section 5 of CIPFA’s
“Treasury Management in the Public Services” Code of Practice
(the Code) and most up to date revisions to the Code.
11.2
Treasury
Management Policy
Statement and
Practices
The Section 95 Officer must arrange for the creation and
maintenance of a Treasury Management Policy Statement and
Treasury Management Practices, which identify the manner in
which the Council shall manage and control its Treasury
Management activities.
11.3
Prudential Code for
Capital Finance in
Local Authorities
The Chief Officer (Finance) is responsible for establishing a
control framework that complies with the requirements of the
Prudential Code for Capital Finance in Local Authorities, and for
regular monitoring of prudential indicators during the financial
year.
11.4 Investment Strategy 
In accordance with the Local Government Investments (Scotland)
Regulations 2010, the Section 95 Officer must arrange for the
creation and maintenance of an Annual Investment Strategy and
Annual Investment Report. Council funds shall be invested in
accordance with the approved annual investment strategy and
shall be held in the name of the Council.
11.5 Borrowing and
Investment
All borrowing, investment and leasing including that related to
Trust and Charitable Funds, will be under the control of the Chief
Officer (Finance) in accordance with the provisions of the
aforementioned Code of Practice on Treasury Management,
Prudential Code for Capital Finance in Local Authorities, Treasury
Policy Statement and Treasury Management Practices, all of
which have been adopted by the Council. 
11.6 Leasing
Services must obtain the approval of the Chief Officer (Finance)
before entering into any leasing agreements (operational and
finance) with a finance company. Leases affected must be in the
Council’s name. 
Leases must be reviewed with Finance staff and reported to the
Treasury, Capital and Controls team to ensure compliance with
proper accounting practices (IFRS 16). Where guidance is
required, Finance staff and the Treasury, Capitals and Controls
team will provide support. 
Page 144 of 218

Page 145

12. BANKING 
12.1 Bank Accounts
All arrangements with the Council's Bankers shall be made by the
Chief Officer (Finance), who shall be authorised to open such
bank accounts as they may consider necessary.
12.2 Cheques
All cheques required to support the banking arrangements of
Council-operated Services shall be ordered only on the authority
of the Section 95 Officer, who shall make proper arrangements for
their safe custody.
12.3 Signatures
With reference to 12.2 above, all cheques, excluding those
required by Charitable Trusts, shall be signed by the Chief Officer
(Finance); manual cheques may be signed by other responsible
persons, per the Councils bank mandate, specified by the Section
95 Officer, on their behalf.
12.4 Petty cash There are separate arrangements for the operation of petty cash
Accounts.  These are described in Regulation 20.
12.5 Credit Cards
Any requests for a corporate credit card must be made in
accordance with the Councils Corporate Credit Card Policy with
all aspects of the policy properly adhered to.
Misuse of credit cards will result in action under the Council’s
disciplinary procedures.
12.6 Purchase Cards
Purchase cards will be issued only where there is a clear business
benefit or need. Their issue will be approved by service managers
and the cardholders will need to agree to the terms of their use.
Restrictions on their use will normally be applied and will be coded
into the card itself. Misuse of purchase cards will result in action
under the Council’s disciplinary procedures. 
The Chief Officer (Finance) is responsible for overseeing the issue
and use of cards as well as associated VAT compliance.
12.7
Direct
Debits/Standing
Orders
All direct debit instructions and standing orders approved for
payment by Services must be authorised by the Chief Officer
(Finance).
12.8 Banking Contract
All services provided by the bank in relation to the management
of the Council’s bank accounts and the issue of cheques shall be
renewed periodically by a competitive tendering process. 
13. PAYROLL 
13.1 Payment
Payment of all wages, salaries, travelling and subsistence
expenses and other Payroll items will be made by the Chief Officer
(People Resources), with delegated authority from the Section 95
officer.
Page 145 of 218

Page 146

13.2 Information
The Chief Executive, Chief Officers, or other officer where
appropriate, will provide to the Section 95 officer, delegated to the
Chief Officer (People Resources), in accordance with a timetable
laid down by, and in a form approved by them, information
regarding appointments, resignations, dismissals, promotions,
increments, pay awards, hours worked, overtime, sickness, travel
and subsistence and any other items affecting the remuneration
of employees, or essential to maintain records regarding Tax,
National Insurance and Superannuation.
13.3 Certification
All payroll information must be supplied by Authorised Signatories. 
Signatories are certifying that the information is accurate and that
any overtime and expenses relate directly and exclusively to the
Council's business.
13.4 Payment method
The normal method of payment shall be by the Bankers
Automated Clearing System (BACS). Where this is not possible,
payment will be made by cheque or under special circumstances  
by prior agreement with the Treasury, Capital and Controls team
using online banking payment services e.g. faster payment,
CHAPS. 
14. PAYMENT OF CREDITORS
In conjunction with Internal Audit, a number of interim arrangements have been put in place
to allow the continuation of payments to creditors whilst a large proportion of staff work from
home.  The key principles set out in these regulations stand however where a working from
home arrangement is in place this will be displayed in italics.  
14.1 Ordering
Chief Officers are responsible for ordering goods and / or services
for their Services, which shall be carried out in accordance with
the Council’s contract standing orders, approved procurement
strategy and guidance notes.
14.2
Electronic
Purchase Order
Processing
Where available, Services shall use PECOS or other approved
electronic procurement systems for all purchases.  Services using
electronic procurement systems must use electronic order forms
for all purchases, which require to be authorised electronically by
an authorised signatory. Where an urgent order is made by letter
or on the telephone, an electronic order form must subsequently
be sent in confirmation within a day of the request
14.3 Manual Purchase
Order Processing
Manual purchase orders should only be used where Services do
not have access to PECOS or other approved electronic
procurement systems. Official Order Forms will be used for all
purchases and must be signed by Authorised Signatories.  Where
an urgent order is made by letter or on the telephone, an official
order form must subsequently be sent in confirmation within a day
of the request.
Page 146 of 218

Page 147

14.4 Certification
Chief Officers will arrange for the certification of invoices and other
equivalent payment vouchers received from suppliers,
contractors, or generated from Service systems, and remit them,
physically or electronically, to the Chief Officer (Finance) for
payment. In making these arrangements, Chief Officers must
have regard to the need for Internal Check (19.3 below).
Authorised Signatories are certifying that: 
• the goods or services included are as ordered, 
• the payment is properly due under the terms of any
contract, and that the prices, all arithmetical details are
correct, and all contract documents are available for
inspection should they be requested.  This should include
sufficient evidence to justify annual price increases and
tables of agreed charges where appropriate, and the
expenditure has been properly incurred.  
In addition, they are also confirming that they have delegated
authority to certify payment to the value of each individual
invoice or equivalent payment voucher enclosed in the batch. 
The Chief Officer (Finance) is responsible for overseeing the
compliance of creditors payments certification with any issues
reported to the Section 95 Officer where appropriate.   
Arrangements have been put in place to facilitate the authorisation
of invoices whilst staff work from home.  This process requires
dual authorisation through email with the following certification
statement: 
Certification Statement
I confirm that I am certifying payment of the enclosed invoices or
other equivalent payment vouchers in accordance with North
Lanarkshire Council’s current Financial Regulations and that:
(a) The goods or services included are as ordered;
(b) The payment is properly due under the terms of any contract
and that the prices and all arithmetic details are correct; and
(c) The expenditure has been properly incurred.
I also confirm that I have delegated authority to certify payment
to the value of each individual invoice or equivalent payment
voucher enclosed in this batch.
• Contract documents are available for inspection, should
they be required, which confirm relevant contract details
to support the payment, including evidence supporting
annual price increases and tables of charges. 
Total Count of invoices or other equivalent payment
vouchers being certified: ____________   
Total Gross Value of invoices or other equivalent payment
vouchers being certified: ___________   
Page 147 of 218

Page 148

Certified by: _______________________ (print name)     
_______________ (date) 
14.5
Certification of
Cheque request
forms
All payment / cheque requests must be made using the Standard
Template and must be authorised by two different authorised
signatories (i.e. officers with the appropriate level of delegated
authority per the authorised signatory list).  As with invoice
certification, authorisation by email is acceptable.  
Once the Standard Template has been completed, it should be
saved as a PDF (so that it cannot be amended) and sent to the
first authorised signatory, with the email subject stating ‘Request
for payment / cheque’.  The first authorised signatory should
check the form and be satisfied that it should be processed for
payment.
Once satisfied that the form should be processed for payment, the
first authorised signatory should forward the email to the second
authorised signatory for checking and agreement.  Once agreed,
the second authorised signatory should then forward the email to 
CreditorsDPMailbox@northlan.gov.uk for processing, ensuring that
the email trail clearly indicates the dual authorisation process.
As this is the authorisation process, any payment / cheque
requests which do not follow this process and clearly show the
dual authorisation process will not be processed for payment and
will be returned to the sender’s mailbox. 
14.6 Payment
All invoices and other equivalent payment documents, with the
exception of petty cash items, may only be paid by the Section 95
Officer who may carry out such additional checks as deemed
necessary. Petty cash items are covered by Regulation 18.
14.7 Alterations
In the unlikely event that a voucher has to be altered, this should
be done by an Authorised Signatory, clearly, by stroking out and
correcting in ink.  Correcting fluid must not be used.  Invoices must
not be altered by staff, but must be sent back to the supplier for
correction.
14.8 Payment method
The normal method of payment shall be by the Bankers
Automated Clearing System (BACS).  Where this is not possible,
payment will be made by cheque following written confirmation
with the Creditors Section or under special circumstances by prior
agreement with the Treasury, Capital and Controls team using
online banking payment services e.g. faster payment, CHAPS.
Note that arrangements for same day faster payments must be
notified to the Treasury, Capital and Controls team before 10am
on the required day.
Page 148 of 218

Page 149

14.9 Payment Timing
Every effort will be made to adhere to any payment timetable
stipulated in contracts (including Small, Medium Enterprises
currently on 20-day terms), or otherwise within 30 days. Where
special circumstances exist for a contract’s payment terms, these
must be notified in writing to the Creditors Section by the
appropriate authorised signatory. Chief Officers should pass
certified invoices to Finance within 20 days of receipt.  Finance
should process properly certified invoices within 5 days of receipt.
14.10 Certification of
urgent payments
All invoices that are overdue and presented late to creditors
should be submitted individually by email.  If a service wishes
these overdue invoices to be treated as urgent, the invoice
certification checks and reviews should be carried out as usual,
however, the authorisation for payment of these invoices must be
submitted to creditors by email to ‘Data Processing Mailbox –
Creditors’ by the Chief Officer responsible for that area of business
directly, with the subject line ‘Urgent Payments – Invoices
Overdue’.  The following text must be added to the body of the
email, “I authorise the attached batch containing xx
invoices/documents to the value of £xx.xx to be processed
for payment.  These invoices are already overdue and should
be treated as urgent because ………………………” 
15. CONTRACTS
15.1 Register
Chief Officers shall maintain records of all contracts relevant to
their Services and payments made.  The Chief Officer (Finance)
shall have access to all such records.
15.2 Payments (re
contracts)
Payment Certificates to Contractors may be signed only by
Authorised Signatories.
15.3 Variations
Subject to the conditions of contract in each case, every variation
shall be authorised in writing by the appropriate Chief Officer
(Budget Holder) or private professional or consultant as
appropriate, or by other officer nominated by them, or, in special
circumstances, by other officer approved by the Section 95
Officer.
15.4 Significant
Variations
Any variations where the outturn/expected costs exceed the
tendered contract price by the higher of £25,000 or 5%, or where
the outputs/outcomes achieved by the expenditure differ
significantly from those originally envisaged, shall be reported by
the appropriate Chief Officer (Budget Holder) to the relevant
Spending Committee at the earliest opportunity. 
15.5 Time Delay
Where completion is delayed beyond the agreed timescale, the
Chief Officer (Budget Holder) shall, in consultation with the
Monitoring Officer – Chief Officer (Legal and Democratic) - take
appropriate action in regard to liquidate ascertained or other
damages. 
Page 149 of 218

Page 150

16.  SECURITY 
16.1 Responsibility
All Chief Officers are responsible for maintaining proper security
over all buildings, stores, furniture, equipment, cash, etc., under
their control. Chief Officers will consult the Section 95 Officer when
advice may be required, concerning existing or new situations.
16.2 Cash Holdings
Chief Officers will agree limits for cash holdings on their premises
with the Section 95 Officer.  These may not be exceeded without
the prior written agreement of the Chief Officer (Finance).
16.3 Key holders
Chief Officers must ensure that keys for safes and similar
receptacles for cash or other valuables are securely controlled by
persons specified as key holders. Each Chief Officer will keep a
register of key holders.  Any loss of such keys must be reported
to the Chief Officer (Finance) immediately upon discovery of loss.
16.4 Controlled
Stationery
The Chief Officer (Finance) shall ensure that secure
arrangements are in place for the custody and issue of pre-printed/
pre-signed cheques, and any other stocks of stock certificates,
bonds, and any other valuable financial documents.
16.5 Retention of
Documents
Chief Officers are responsible for the safekeeping and control of
all documents in their services. The Section 95 Officer in
consultation with the Monitoring Officer will specify the retention
period for documents of a financial nature, which is prescribed
within the NLC Retention Schedule.
16.6 Data Protection
Personal data (both manual and computerised) held by the
Council may not be used for any purposes other than those which
are registered by the Council under the Data Protection Act 1998.
The Council has a duty to respond timeously, within 40 days, to
requests for information (“Subject Access Requests”), provided
that the conditions contained in the Data Protection Act 1998 are
met. The Service receiving the request should deal with the
subject access request and maintain a record of information
provided in respect of all subject access requests, in accordance
with the Council’s Data Protection Policy. The above applies with
reference to subsequent amendments to the Data Protection Act
1998 to take account of General Data Protection Regulations. 
17. STORES AND INVENTORIES
17.1 Storekeeping
Chief Officers are responsible for the safe keeping and control of
all stocks and stores in their Services and must arrange for regular
stocktaking. 
17.2 Adjustments
Where a Chief Officer has had to make adjustment for stock
surpluses or deficiencies, a report must be submitted to the
Spending Committee and the Finance and Resource Committee
specifying the reasons for the adjustments and the amounts
thereof.
17.3 Disposal of
equipment
A Chief Officer who has equipment, furniture or stock surplus to
requirements (excluding ICT equipment) should first offer it to
other Chief Officers. Thereafter, Chief Officers wishing to dispose
Page 150 of 218

Page 151

of surplus items shall do so by sale advertised in the press, either
by sealed offer or by public auction.  Any proposals for a different
method of disposal must be approved by the Section 95 Officer.
Assets which are obsolete or beyond economic repair, and whose
individual estimated value at the date of disposal is less than
£1,500, can be disposed of by the Service without prior approval
by the Section 95 Officer provided that the disposal of each item
has been authorised by the relevant Chief Officer.
17.4 Disposal of ICT
equipment
Where a Chief Officer has ICT equipment that is surplus to
requirements, obsolete or beyond economic repair, their nominee
shall contact the IT Service Desk to ensure that all data is safely
removed and the equipment disposed of in accordance with the
Council’s IT policies.
17.5 Stock Levels
Stocks and stores must not be in excess of normal requirements. 
Chief Officers wishing to make exceptional arrangements must
seek the authority of the appropriate spending Committee.
17.6 Inventories
Chief Officers must maintain inventories, in a form specified by or
approved by the Chief Officer (Finance) and must have them
checked annually.
17.7 Removal
Council property, excluding portable devices (e.g. Laptops), may
not be removed from Council premises without the written
authority of the appropriate Chief Officer. Line management
approval must be obtained prior to removing portable devices from
Council premises.
17.8 Valuations
Chief Officers shall supply to the Chief Officer (Finance) annually,
certified and dated copies of stock lists and inventories required
for the closing of the Accounts. 
18. INSURANCE
18.1 Insurance
Where insurance is the chosen option, the Chief Officer (Finance)
shall effect and maintain suitable cover, and will put in place
suitable arrangements for the negotiation of any claims, in
consultation with other Chief Officers.
18.2 New Risks
Chief Officers must immediately notify the Chief Officer (Finance)
of:
i) any new Service activities or practices which could have a
significant effect on the potential liability of the Council to
other parties so as to allow for effective insurance
arrangements; or
ii) any changes to the Council’s asset portfolio which will affect
the level of cover required for Council owned property i.e.
significant additions or deletions of premises, so that the
Chief Officer (Finance) can change the level of cover in
place.
18.3 Insurance Risk
Management
The Chief Officer (Finance) shall, at not less than five-yearly
intervals, submit to the Finance and Resources Committee an
insurance risk management and funding strategy.
Page 151 of 218

Page 152

18.4 Losses
Chief Officers must immediately notify the Section 95 Officer of any
losses or other events likely to lead to a claim, who is responsible
for taking appropriate action after liaising with the relevant Chief
Officer. 
19. ACCOUNTING PROCEDURES
19.1 Systems and
Records
The Chief Officer (Finance) shall specify or approve all accounting
systems and records of the Council, wherever kept.
19.2 Principles All systems will be designed in accordance with best practice, and
will incorporate internal controls to ensure that, as far as possible:-
(i) all income of the Council is promptly and properly recorded 
and collected,
(ii) all expenditure of the Council is properly incurred, 
authorised and duly paid, 
(iii) all cash, stores and other assets of the Council are safely 
kept and controlled, 
(iv) due cognisance of the Section 95 Officer’s requirements in 
respect of reconciliations, audit trails and control, and
(v) Finance should be directly involved at the tender,
implementation and post-implementation review of  new
internal control and recording systems to ensure they
comply with the above requirements.
19.3 Internal check As far as possible, segregation of duties should occur among
employees so that:-
(i) the calculation, recording or certification of sums due to or 
by the Council should not be in the hands of one person,
(ii) those who calculate, record or certify sums due to or by 
the Council should not be involved in the eventual receipt 
or payment of those sums, and
(iii) those who examine or check cash transactions should not 
be directly involved in those transactions
(iv) all checking and authorisation undertaken by officers must 
be evidenced by initials or signature.
Where segregation of duties is not possible, direct line managers
should be made aware and the associated risk included on the
relevant Risk Register.
19.4 Provision of
Information
Chief Officers will supply to the Section 95 Officer, in accordance
with their timetable, all information necessary, including that
relating to ALEOs, to enable them to close the Council's Accounts
by the statutory date each year. The statutory date is currently 30
June.
Final Audited Accounts of Council Subsidiary Companies should
also be made available to allow the Council to comply with the
statutory deadline of publishing those accounts on the Council
website by 31 October each year as per the Local Authority
Accounts (Scotland) Regulations 2014.  
Page 152 of 218

Page 153

19.5 Statutory Accounts
Audited Annual
Accounts Deadlines
The Chief Officer (Finance) requires the attendance and signature
of the following members and officers by the statutory completion
date:
Chief Officer (Finance); 
Chief Executive; and
Council Leader. 
The Annual Accounts require the signature of the Leader of the
Council and the Chief Executive directly following the approval at
the Council’s Audit and Scrutiny Panel.  Approval of the accounts
for signature should be no later than 30 September unless
special/temporary legislation states otherwise. 
20. CASH ADVANCES – GENERAL AND IMPREST
20.1 Responsibility
The Chief Officer (Finance) shall provide cash advances to those
who require them for the purpose of minor items of expenditure. 
The Advance for Officials Expenses form should be completed by
the relevant officer and signed by their authorised Service Contact
and countersigned by the relevant Finance accountant.  Whilst
working from home, this process can be completed through email
authorisation with a clear trail shown between appropriate
personnel.  The completed form should be emailed to the “cash
advances” mailbox ready for an officer to collect from their
preferred First Stop Shop – Motherwell, Wishaw, Coatbridge or
Kilsyth.  
All receipts to support the spend should be retained and returned
with any cash remaining from the advance within 1 month of the
cash advance being received.  
20.2 System – Imprest 
The particular bookkeeping system in use for petty cash in all
Services is the Imprest System, and those who have cash
advances are referred to as imprest holders.
20.3 Rules – Imprest 
Imprest accounts will be operated to rules set by the Section 95
Officer.  These will be notified to all imprest holders, and must be
strictly adhered to.
20.4 Termination –
Imprest 
Any imprest holder who leaves the Council's employment or
through any other circumstances ceases to be entitled to be an
Imprest Holder, must account to the Section 95 Officer for the
amount of the advance.
20.5 Payment Method –
Imprest 
Imprest holders may make payments in cash or by cheque drawn
by them on their respective Imprest Bank Accounts. 
Page 153 of 218

Page 154

21. AUDIT
21.1 Responsibility
The Section 95 Officer and Chief Officer (Audit and Risk) shall
ensure the adequacy and effectiveness of the Council’s internal
controls including financial and operational controls, risk
management systems and key governance processes are
independently reviewed on a regular basis in accordance with the
Public Sector Internal Audit Standards and associated Local
Government Application Note.
Internal Audit will operate in a manner consistent with the Internal
Audit Charter which explains in more detail its purpose, authority
and responsibilities. This document is reviewed annually and is
approved by the Section 95 Officer, the Chief Executive and the
Audit and Scrutiny Panel.
21.2 Access
Internal Audit staff have authority to:-
(i) enter all Council premises or land at all reasonable times,
(ii) have access to all records,
(iii) require and receive any explanations necessary 
concerning any matter under investigation, and
(iv) require any employee to produce cash, stores or other 
property under that employee's control.
21.3 Value for Money Internal Audit staff will contribute in an appropriate manner to the
achievement of value for money in Council services.
21.4 Irregularities
Chief Officers must report any evident or suspected irregularity
involving cash, stores, expenditure, income, contractual powers or
any other item of a financial nature, immediately, to the Audit and
Risk Manager.
21.5 Reporting
The Chief Officer (Audit and Risk) shall report on Audit activity to
the Chief Executive, Section 95 Officer and the Audit and Scrutiny
Panel.
21.6 External Audit
External Audit staff must be given access by Services to all
relevant records required to enable them to conduct the external
audit of the Council in accordance with the Code of Practice
issued by Audit Scotland. Where staff are unsure about providing
access, advice should be sought from the Section 95 Officer. 
22. MEMBERS’ REMUNERATION AND EXPENSES
22.1 Responsibility
The Section 95 Officer shall be responsible for the administration
of expenses and remuneration to members of the Council in
accordance with Scottish Government Regulations.
22.2 Payment
Payment to members, including co-opted members, will be made
by the Chief Officer (Finance) in accordance with the Regulations,
upon receipt of the prescribed form duly completed, where
appropriate.  All claims for a financial year are to be submitted
within one month after 31st March of that financial year. 
Working from home arrangements require claim forms to be
received electronically. 
Page 154 of 218

Page 155

23. FINANCIAL REGULATIONS  
23.1 Authority
These Regulations were approved by the Committee in May 2018
and have been subject to annual review since. 
23.2 Responsibilities
Chief Officers are responsible for ensuring that all appropriate
members of staff, and where appropriate, external consultants,
contractors and relevant partner organisations, have access to the
Council’s Financial Regulations and Contract Standing Orders.
23.3 Breach
Any employee discovering a possible breach of these regulations
must report the matter immediately to their Chief Officer, who must
in turn immediately report it to the Section 95 Officer.  Failure by
any employee to comply with the Regulations, or, in the case of
staff with appropriate supervisory responsibilities, failure to ensure
the compliance of others, can be a serious offence which may give
rise to action.
23.4 Special Provisions
The Education, Children and Families Committee may request
amendments to these Regulations insofar as they apply to the
devolved Management of Resources by educational
establishments, in consultation with the Chief Officer (Finance),
and reported to the Finance and Resource Committee.
23.5 Annual Review
The Chief Officer (Finance) will consider these Regulations
annually, and having consulted the Chief Executive, Chief Officers
and Chief Accountable Officer for Health and Social Care, will
present proposals for revision of the Regulations, where
appropriate, to the Finance and Resource Committee for
approval.
23.6 Circulation
Electronic copies of these Regulations are issued directly to the
Chief Officers. In addition, the document can be accessed on the
Council’s Intranet, or via the Council’s Minutes, Agenda and
Reporting system – Finance and Resource Committee.
23.7 Advice
Any queries regarding the Regulations or their interpretation
should be made in the first instance to the Chief Officer (Finance),
or your relevant Finance contact who can refer any queries on to
the relevant officer for review. 
Page 155 of 218

Page 156

Appendix 3
FINANCE
SCHEME OF DELEGATION
FINANCIAL MANAGEMENT RESPONSIBILITIES 
1. Section 95 Officer
1.1. The Council, in terms of Section 95 of the Local Government (Scotland) Act 1973, has
designated the Chief Officer (Finance) as the officer responsible for the proper
administration of the Council’s financial affairs, and nothing in this Scheme alters that
responsibility. However, to enable the Section 95 Officer to fulfil his/her responsibilities
in the most effective manner and to ensure that there is no ambiguity in relation to
accountability, it is necessary for each level of management to delegate formally, and to
issue a clear statement detailing, operational responsibility.
1.2. The Chief Officer (Finance), as Section 95 Officer, has the following specific
responsibilities:
1.2.1. To ensure the accurate and timeous preparation of the Council’s Revenue
Estimates, Medium-term and Long-term Financial Plans as appropriate, Capital
Programmes and Statutory Accounts; all in accordance with laid-down timetables
and procedures.
1.2.2. To report the summary position for both revenue and capital budgets at each
committee cycle, with the intervening reports being presented to the Corporate
Management Team.
1.2.3. To ensure reports are prepared by Service based Finance personnel in
consultation with budget managers, in accordance with the Financial Regulations
and ensure they are presented to the relevant Committee of the Council.
1.2.4. To ensure that all government and other external reporting body returns (POBE,
LFR’s, Whole of Government Accounts, Prudential Code Indicators, Capital
Expenditure and Income Statistics etc.) and Grant claims are submitted to the
appropriate body by the due dates.
1.2.5. To ensure the development of Finance’s response to Best Value as set out in the
Local Government Act 2003.
1.2.6. To review government grant mechanisms, identifying areas of potential review,
and research alternative methods of funding.  
1.2.7. Ensure the development of financial and management systems.
1.2.8. Maintain, review and update financial policies to reflect the corporate priorities of
the Council.
1.2.9. To ensure that the Council has an appropriate Treasury Management Strategy
which complies with recommended best practice and accords with the CIPFA
Code of Practice and Prudential Code for Capital Finance.
1.2.10. To ensure that the Council’s Loans Fund and day to day borrowing and
investment arrangements are in line with the statutory Annual Investment
Strategy, and to report the Council’s Treasury Management Performance to
Committee as required.
1.2.11. To ensure that professional standards and staff performance are maintained by
all staff delivering financial services.
Page 156 of 218

Page 157

1.2.12. To ensure that appropriate access to training needs is available to enable staff to
achieve their potential.
1.2.13. To ensure that a library of standard financial and accounting procedures is
maintained for each Service, Trading Activity, Trust and other body such as a
Private Company, in which the Council has a financial interest.
1.3. The Chief Officer (Finance) has delegated the areas of responsibility described in this
Scheme of Delegation to specified officers of Finance. In fulfilling any responsibilities
delegated to them, specified officers will: 
1.3.1. Conform with professional guidelines and standards of competence;
1.3.2. Comply with recognised accounting codes of practice.
1.3.3. Act in a professional and competent manner.
1.3.4. Seek to ensure that members of their staff do the same.
1.4. Specified officers will not sub-delegate any of their delegated responsibilities without the
written consent of the Chief Officer (Finance). Duties may be sub-delegated, but not
responsibilities.
2. Specific Delegation to Officers 
2.1. The items listed in Section 2 of this Scheme of Financial Delegation are not to be
regarded as an exhaustive list of the responsibilities of the specified officers. The
Scheme must be read in conjunction with the officer’s Contract of Employment, Job
Description and Professional Codes of Conduct. 
2.2. The Chief Officer (Finance) has made the following specific delegations in respect of the
provision of Finance. 
2.3. Business Finance Manager 
2.3.1. Develop strategic business plans and manage service delivery consistent with
these plans and in line with national and council policies.
2.3.2. Ensure best value in the management and delivery of services under direct
control,  ensuring that all relevant legislative requirement and professional
standards are fulfilled and the best available assistance and  advice is provided
to Chief Officers within a changing economic and legislative environment.
2.3.3. Monitor along with other members of the Management Team, the external
environment to ensure continued strategic fit between organisational capabilities
and the changing demands upon the service.
2.3.4. Identify and develop opportunities for service improvement through collaborative
projects/joint ventures with partner agencies.
2.3.5. Represent the Service and Council as necessary, including attendance at all
relevant committees of the Council, working groups, conferences, seminars and
meetings.
2.3.6. Provide support to national activities, including COSLA and Scottish Government
as required.
2.3.7. Provide performance information and the preparation of reports for Council
Committees, Sub Committees and working groups as required.
2.3.8. Promote and develop the use of options appraisal and other business and
analytical techniques in support of continuous improvement.
Page 157 of 218

Page 158

2.3.9. Support Chief Officers to ensure the effective and efficient deployment of financial
resources within Services.
2.3.10. Ensure employees adhere to the Council’s Financial Regulations and Scheme of
Financial Delegation and ensure probity in the use of financial resources.
2.3.11. Manage the accounting and audit process, ensuring adherence to council
financial policies and procedures, legislative requirement and professional
standards.
2.3.12. Ensure effective operational financial management of revenue and capital
budgets and establish and maintain systems whereby budget managers regularly
account for the budgets under their control.
2.3.13. Provide financial management information and professional advice, direction and
support to delegated budget holders on all financial matters.
2.3.14. Monitor, measure and report on financial performance according to agreed
performance indicators and frameworks.
2.3.15. Maintain positive working relationships with other officers, elected members
(individually and collectively at Committee/Working Groups etc) and Community
Planning partners. This will involve working across all service groups and with
chief officers to ensure a joined up approach to the delivery of such services.
2.3.16. Oversee the Council’s monitoring and maintenance of effective controls and
reconciliations of data or cash controls as appropriate.
2.3.17. Ensure that statutory returns and grant claims are completed and returned within
required deadlines. 
2.3.18. Identify Key financial risks and address these as appropriate, in terms of internal
controls, monitoring and planning arrangements.
2.3.19. Support the Council’s pursuit of an effective health and safety culture by using
the policies, procedures, risk assessments and training provided to work safely,
giving due regard to yourself, others you work with and those who may use
council services.
2.3.20. Deputise for the Chief Officer (Finance) as appropriate.
2.3.21. Coordinate and prepare the Council’s annual revenue and capital budgets
providing advice on matter relating to financial strategy, funding resources and
expenditure pressures.
2.3.22. Oversee the preparation of the Annual Accounts of the Council and associated
bodies in accordance with legislative accounting requirements and professional
standards.
2.3.23. Oversee the Council’s Treasury Management function ensuring the effectiveness
of the Authority’s Treasury Management policy and borrowing strategy.
2.3.24. Oversee the Council’s financial monitoring and governance arrangements of our
Arms Length External Organisations (ALEO’s).
2.3.25. Provide a comprehensive financial systems development, research and Taxation
service.
2.3.26. Manage the rent accounting function, developing and maintaining a fair and
effective differential rent structure.
2.3.27. Ensure that adequate systems are in place to collect and account for other
sources of income.
Page 158 of 218

Page 159

2.3.28. Consult with the Service Management Teams to assess how the existing financial
management needs have been met and plan for future requirements.
2.3.29. Oversee the monitoring of the Councils Devolved School Management (DSM)
scheme, ensuring adherence to the scheme and the effective use of budgets and
recommending changes where appropriate.
2.3.30. Manage elements of the DSM scheme not directly within the Finance structure.
2.3.31. Consult with the Service Management Teams to assess how the existing financial
management needs have been met and plan for future requirements.
2.4. Finance Manager
2.4.1. Manage all activities to ensure that appropriate professional advice and guidance
is provided on all relevant financial issues within the scope of the Finance
Manager’s responsibilities.
2.4.2. Ensure effective arrangements are implemented and adopted for providing
prompt customer focussed service.  Develop solutions to complex problems and
respond to high level queries from senior managers, service managers, elected
members and external bodies.
2.4.3. Ensure team members follow Council policies, procedures, legislative
requirements and professional standards.
2.4.4. Provide the Finance Management Team and Council Services with professional
advice on matters relating to the operation and development of the Services
including:
2.4.4.1. Providing financial management, business planning and accounting
services for a range of specified Council Services.
2.4.4.2. Ensuring financial support provided to Services is efficient, integrated
and responsive to change.  Support Services in the delivery of the
transformational change by providing professional guidance and support
on business planning and financial management.
2.4.4.3. Directing the activities of Accountants, Assistant Accountants and other
support staff to ensure revenue and capital plans, budget monitoring and
annual accounts arrangements are effectively in place across the
Council.
2.4.4.4. Identifying key financial risks and addressing these as appropriate in
terms of internal controls, monitoring and planning arrangements.
2.4.4.5. Reviewing and ensuring compliance with financial regulations including
SORPs and CIPFA Codes of Practice and other financial controls.  Act
upon internal and external audit reports relevant to areas of
responsibility.
2.4.4.6. Promoting best financial practice to ensure effective use of and
accountability for revenue and capital resources.  Develop and maintain
effective procedures in line with the scheme of financial delegation.
2.4.4.7. Reviewing statutory and statistical returns and grant claims to ensure
that the Council’s needs and resources are accurately identified.  Ensure
all grant claims and statutory returns are completed and submitted within
required deadlines.
2.4.5. Manage and develop the staff in the group, ensuring the highest professional
standards by setting objectives and performance standards, developing work
Page 159 of 218

Page 160

plans identifying training requirements, reviewing performance and taking such
remedial action as necessary to ensure that standards are maintained.
2.4.6. Develop and maintain good working arrangements with other Finance Managers,
Service Managers, elected members, trusts and external organisations to ensure
efficient, effective and corporate working.
2.4.7. Respond positively to changes affecting the service, advocate new practice and
procedures and drive forward change processes.  Ensure that the professional
integrity of the service is maintained at all times.
2.4.8. Represent Finance where appropriate at e.g. national associations, professional
working groups, Council meetings etc.
2.4.9. Ensure that income and expenditure are monitored against Service budgets and
that variances are reported timeously.
2.4.10. Prepare reports to senior management and the Council, as required.
2.4.11. Support the Council’s pursuit of an effective health and safety culture by using
the policies, procedures, risk assessments and training provided to work safely,
giving due regard to yourself, others you work with and those who may use
Council services.
2.4.12. Manage the preparation and production of the Council’s annual revenue and
capital budgets and supporting strategies and plans.
2.4.13. Co-ordinate the preparation of the Annual Accounts and other statutory returns
of the Council and associated bodies in accordance with legislative accounting
requirements and professional standards.
2.4.14. Manage Council’s Treasury Management function ensuring the effectiveness of
the Authority’s Treasury Management policy and Borrowing Strategy.
2.4.15. Manage the Council’s financial monitoring and governance arrangements of
Arms Length Organisations (ALEO’s)
2.4.16. Assist in providing a comprehensive financial systems development, research
and Taxation service.
2.4.17. Ensure effective ledger control.
2.5. Accountant
2.5.1. Manage all activities within the job remit ensuring professional advice and
guidance is provided at all times.
2.5.2. Provide the Chief Officer (Finance), Business Finance Managers, Finance
Managers, Council Services and ALEOs Management teams/boards with
professional advice on all matters relating to the financial management of the
Council including:
2.5.2.1. Taking a lead role in financial management, business planning and
accounting services for a range of specified Council services/ALEOs,
promoting best financial practice across the Council.
2.5.2.2. Providing financial support to service in an efficient, client-focussed and
integrated manner.
2.5.2.3. Assisting senior management in the development and maintenance of
effective financial controls across the Council/ALEOs, assessing
potential for improvements to internal controls and monitoring
processes.
Page 160 of 218

Page 161

2.5.2.4. Assisting senior management on the financial implications of the
implementation of policy and legislative changes.
2.5.2.5. Provide financial advice and support to transformational projects as
identified by the Transformation Committee.
2.5.2.6. Ensuring compliance with the Council’s Financial Regulations and
proper accounting practice, including relevant Code of Practice on Local
Authority Accounting and other relevant legislation and guidance.
2.5.2.7. Contributing to the provision of best value services within a changing
and challenging environment.
2.5.2.8. Compiling statutory and statistical returns and grant claims to ensure
that the client needs and financial resources are accurately identified. 
2.5.3. Develop and maintain good working arrangements with service managers, senior
staff and outside bodies to ensure efficient and effective corporate working.
2.5.4. Provide financial support to major projects, developments and initiatives including
option appraisal techniques, financial analysis, affordability levels and methods
of funding, representing the client as required on multi-disciplinary teams.
2.5.5. Represent senior management where appropriate at service and corporate
working groups, project teams and national associations, etc.
2.5.6. Supervise and direct the activities of assistant accountants, administrative staff
and Modern Apprentices, through preparation and monitoring of annual work
plans/key objectives, managing performance to deliver effective outcomes and
developing individual skills and expertise.
2.5.7. Prepare corporate and committee monitoring reports in the approved format.
2.5.8. Monitor the capital programme and prepare reports on capital expenditure
patterns and the performance of the capital programme against approved plans.
2.5.9. Provide advice and guidance to managers and staff on budgetary control and
financial information systems, ensuring robust, well-documented procedures are
in place.
2.5.10. Prepare and provide formal training and guidance to Senior Managers and
budget holders.
2.5.11. Working closely with the Finance Manager, prepare the Annual Statutory
Accounts of the Council and related support documentation in accordance with
accounting standards and legislative requirements.  Liaise with controls and
reconciliations staff on the effective reconciliation of all expenditure, revenue and
suspense accounts.
2.5.12. Maintain awareness of and proactively report on issues which may impact on
local government finances.
2.5.13. Undertake research into government grant funding mechanisms and other
external sources.  Prepare briefing papers and supporting analysis for the Chief
Officer (Finance), senior officers of the Council and Elected Members to support
decision making.
2.5.14. Provide a VAT service to the Council ensuring the proper treatment of VAT
transactions and maintenance of VAT procedures and records.
2.5.15. Provide financial management and accounting support for council tax, general
revenue grant, non-domestic rates and other corporate funds managed by
Finance.
Page 161 of 218

Page 162

2.5.16. Maintain and update the Service’s performance management framework
including preparing, collating, and reporting performance and required actions
against key indicators and service objectives.
2.5.17. Ensure ALEO’s compliance with the Council’s approved financial governance
arrangements in accordance with our requirement to follow the public pound,
reporting periodically to the Council.
2.5.18. Support Board Director or Council representative responsibilities through
reviewing strategic and financial plans to ensure consistency with Council aims,
objectives, budgetary provision and to ensure external bodies have robust and
sustainable business plans.
2.5.19. Ensure accuracy of ALEOs statutory accounts, necessary for satisfying the
Council’s statutory responsibility regarding entities’ financial statements in
accordance with relevant timescales.
2.5.20. Appraise the financial performance of companies and other bodies who work to
conduct business with the Council.
2.5.21. Prepare detailed corporate capital planning and expenditure  programmes in
conjunction with other senior officers in the Council and the strategic capital
delivery group, policy priorities and available capital resources and in accordance
with the capital investment strategy.
2.5.22. Manage the effective monitoring of capital programmes and prepare reports on
capital expenditure patterns and the performance of programmes against
approved plans.
2.5.23. Maintain the Council’s fixed asset register and capital accounting requirements.
2.6. Controls and Reconciliations
2.6.1. Ensure the effective on-going control and reconciliation of Council bank accounts
and suspense accounts, Debtors, Creditors, and Payroll Systems, and ensure all
payovers (PAYE etc.) and submission of returns are made within deadlines.
2.6.2. Oversee the daily control and reconciliation of all Council income and ensure
robust procedures are in place for corporate Cash Receipting and the Municipal
Bank.
2.7. Rent Income Team
2.7.1. Oversee the effective control of rent income including reconciliation of the bank
account and direct debit compliance.
2.7.2. Plan and action rent assessments as part of the overall control of rent. 
2.8. Revenues and Benefits
2.8.1. Under the remit of the Section 95 officer the Revenue and Benefits teams have
the responsibility for the effective control of administering, processing and
maintaining revenue and benefit transactions and systems.  This includes for
example Council Tax, Non Domestic Rates, Housing Benefits, Council Tax
Reduction Scheme 
Page 162 of 218

Page 163

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    JMcK/BF Date 20/11/24 
Procurement and Commercial Improvement Programme (“PCIP”)
Assessment Results for North Lanarkshire Council 2023/24 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail McKinstryJ@northlan.gov.uk  Telephone 07939 281 102 
Executive Summary
The ‘Procurement and Commercial Improvement Programme’ (“PCIP”) is a national
assessment process used to appraise the procurement and commercial capability of public
bodies. Scotland Excel conduct the PCIP assessments for the local authority sector. 
This is the third round of PCIP assessments; previous assessments were carried out in
2017 and 2019. For the 2023/24 assessment programme, North Lanarkshire were 1 of 20
local authorities that decided to undergo assessment, while 12 opted not to participate. 
Based on the comparable questions used in all three rounds of PCIP assessments, North
Lanarkshire have continued to improve its overall scoring. 
There are no outputs with a league table of scores by each participating local authority,
however the supporting report from Scotland Excel provides a question-by-question
comparison allowing the council to see where its individual score ranks alongside the other
19 participants. 
The identified strengths and feedback provided by Scotland Excel will be used to help the
council maintain progress and improvement in its procurement function and associated
commercial activities. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Endorse the content of this report; and 
(2) Acknowledge the Scotland Excel PCIP Assessment Report. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work All Programmes of Work
Item 13
Page 163 of 218

Page 164

1. Background 
1.1 The ‘Procurement and Commercial Improvement Programme’ (“PCIP”) is a national
assessment process used to appraise the procurement and commercial capability of
public bodies. 
1.2 As the centre of expertise for ‘local authority’ procurement, Scotland Excel have the
assignment to conduct the PCIP assessments within the local authority sector. 
1.3 The PCIP assessment programme was introduced in 2015 and the previous PCIP
assessments for North Lanarkshire Council were carried out in 2017 and 2019, both
using a question set of 23 items. 
1.4 The 2023/24 PCIP assessment format was designed to be a ‘pulse check’ in which 11
questions would be used, focussing on policies, procedures and performance. Of the
11 questions, 10 questions belonged to the full question set used in 2017 and 2019,
while 1 new question was introduced to cover ‘climate change’. 
1.5 The assessment scoring model for 2023/24 was as follows:
• Developing Area;
• Improving Area;
• Good Practice; or
• Advanced Practice. 
1.6 A change for 2023/24 determined that no partial or half scores would be given. The
assessments would require all elements within the scoring criteria to be demonstrated
for the public body to achieve the desired level.  
2. Report 
2.1 The 2023/24 PCIP assessment was the council’s third PCIP assessment with Scotland
Excel, and our first ‘pulse check’. 
2.2  The finalised 2023/24 PCIP assessment scores for the council were: 
PCIP QUESTION Level Achieved
1 Procurement Influence Advanced Practice
2 Procurement Strategy Advanced Practice
3 Learning and Skills: Capability Improving Area
4 Risk Management Good Practice
5 Commercial Awareness and Acumen Good Practice
6 Continuous Improvement of Procurement Activity Good Practice
7 Climate Change Improving Area
8 Implementation & Exit Strategies, Life Cycle
Planning Good Practice
9 Contract and Supplier Management Good Practice
10 Contractual Obligations & Additional Benefits Improving Area
11 Lessons Learned Good Practice 
2.3  As can be seen from the table with results above, the council achieved the highest
level of ‘Advance Practice’ in 2 of the 11 question themes, with 6 determined to be
‘Good Practice’.  There were 3 themes identified as ‘Improving’, and we were not
assessed as ‘Developing’ for any question.
Page 164 of 218

Page 165

2.4  There are no outputs with a league table of scores by each participating local authority,
however the supporting report from Scotland Excel (reference to Appendix 1 of this
report) provides a question-by-question comparison allowing the council to see where
its individual score ranks alongside the other 19 participants. 
2.5 If we consider that 10 of the questions were applicable for the previous two rounds of
PCIP assessments the council has undertaken, then the council can show
improvement in each successive result. For comparison, our results would be:
• 2017 – 57.50%
• 2019 – 68.75%
• 2024 – 75.00%  
2.6 Whilst the PCIPs are not supposed to be directly comparable, particularly due to the
increased expectation in assessors score guide for 2023/24 and the stricter
assessment criteria that does not afford half marks, we can clearly see continual
progress in a challenging and robust assessment process. 
2.7 Based on our internal comparator scores increasing through each PCIP assessment,
we are demonstrating a continuous upward trend, and it is an external testimony
presenting a positive message that our application of procurement, our procurement
function and procurement professionals are doing things well.  
3. Measures of success 
3.1 The scores achieved against each PCIP assessment theme, including qualitative
feedback from Scotland Excel, must be used as the basis determining focus areas for
improvements to the council’s procurement activity and processes, while building upon
the identified strengths. 
3.2 The council continue to achieve a comparable higher overall score in each successive
PCIP assessment. 
4. Supporting documentation 
Appendix 1 – Scotland Excel’s Report to North Lanarkshire Council, outlining the PCIP
Assessment 2023/24 scores and feedback. 
James McKinstry
Chief Officer (Assets and Procurement) 
Page 165 of 218

Page 166

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant financial impacts been discussed and agreed with
Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 166 of 218

Page 167

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed? 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐ 
Page 167 of 218

Page 168

APPENDIX 1 
Page 168 of 218

Page 169

Page 169 of 218

Page 170

- 
Page 170 of 218

Page 171

Page 171 of 218

Page 172

Page 172 of 218

Page 173

Page 173 of 218

Page 174

Page 174 of 218

Page 175

Page 175 of 218

Page 176

Page 176 of 218

Page 177

Page 177 of 218

Page 178

Page 178 of 218

Page 179

Page 179 of 218

Page 180

Page 180 of 218

Page 181

Page 181 of 218

Page 182

Page 182 of 218

Page 183

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes   ☐ No
Ref          KH/TH/MB Date 20/11/24 
Microsoft Enterprise Agreement 2025-2028 – Procurement Update 
From  Katrina Hassell, Chief Officer (Business and Digital) 
E-mail HassellK@northlan.gov.uk  Telephone 07903 096 121 
Executive Summary 
The purpose of this report is to update the Finance and Resource Committee on current
procurement activity relating to the Microsoft Enterprise Agreement (EA) contract and seek
approval to progress procurement arrangements as outlined in the report. 
It is recommended that the Finance and Resources Committee approves: 
(1) The award of a contract procured via a collaborative procedure through the Crown
Commercial Service (CCS) and Digital Office NFC180 Provision of Microsoft
Licenses and related services up to the value of £11.3M. 
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement (18) Ensure our digital transformation is responsive to all people's
needs and enable access to the services they need
Programme of Work Digital North Lanarkshire
Item 14
Page 183 of 218

Page 184

1. Background 
1.1 The Council’s digital ambitions have seen a significant change in how employees
communicate and collaborate using Microsoft 365 Enterprise Edition Licenses
introduced by Business and Digital through a Microsoft Enterprise Agreement (EA).
Microsoft Licenses support and enable digital transformation, service redesign and
business change processes. 
1.2 The current Enterprise Agreement (EA) facilitates council-wide provision of Microsoft
Licenses and support. It includes Server Cloud Enrolment (SCE), Enrolment for
Education (EES), Dynamics and Centre of Excellence licenses and Azure
consumption. This contract is presently with Phoenix Software Ltd and is due to expire
on 31 March 2025. 
1.3 Licenses contained within the Microsoft Enterprise Agreement (EA) enable users
across the Council, including the school estate to securely access desktop/laptop
software, and on premise and cloud-hosted servers. 
2. Report 
2.1 The council requires to renew the portfolio of Microsoft Licenses and associated
support across all agreements detailed in section 1.2 above for a period of three years
from 1 April 2025 to 31 March 2028. 
2.2 In order to maximise efficiencies within procurements, the council is currently
participating in Public Sector Reform Shared Services as part of the Programme of
Work 2023-2028.  This workstream is driven through the One Service Programme of
Work Board. 
2.3 The Digital Office for Scotland has created an opportunity for shared services through
the Digital Office Collaborative Procurement which provides councils the opportunity to
take part in an aggregated procurement for Microsoft licences with benefits advised as
follows: 
• Price savings – better value for money through increased buying power 
• Process savings – a third part runs the procurement 
• Freeing up of resource for more strategic purchases 
• Collaboration and knowledge share 
• Legally compliant route to market 
• Procurement to tried and tested standard operating procedures 
2.4 This route to market will be advantageous for the council due to its previous success
rate within other Local Authorities (highlighted in Appendix 1) and as such, the Council
is currently in collaboration with Scotland Excel, The Digital Office for Scotland and
Crown Commercial Services (CCS), who are supporting Scottish Councils with their
Microsoft Enterprise Agreement.  
2.5  CCS are running the procurement through their framework ‘Technology Products &
Associated Services 2 (TPAS2) Lot 3 Software’ with only those on the Commercial
Agreement able to submit a bid. 
2.6  Discounts available on Microsoft Licences are negotiated every three years between
CCS and Microsoft as part of a Memorandum of Understanding (MoU) where CCS use
Page 184 of 218

Page 185

national buying power to agree preferential pricing and discounts on products and
services across the technology landscape. CCS are working on a Strategic Partnership
Agreement (SPA24) which is due to be released in November 2024.  
2.7 Due to the timing of SPA24 a benchmarking exercise was undertaken to ensure
currently available costs represent best value and these have been applied to the
Council’s current licence profile with details of costs outlined in Appendix 1 of
this report.
2.8 Following publication of SPA24 any changes to the pricing strategy will be
applied and a final report will be submitted to this Committee in Cycle One of
2025 providing the final contract values.
2.9  The pricing mechanism is a fixed priced contract for individual licences offering a good
level of cost certainty; any fluctuation in overall contract value will be related to volume
changes throughout course of contract.  
2.10 The council is committed to maximising the delivery of community benefits and fair
working practices. The aggregation exercise being undertaken by CCS includes social
value at tender stage using the social value priority theme of tackling economic
inequality.     
2.11 Officers from Business and Digital will be responsible for managing the contract which
will be undertaken in accordance with the council’s agreed approach to contract and
supplier management. 
3. Measures of success 
3.1  The proposed contract award detailed within this report will deliver the following
outcomes: 
a) The successful and optimum provision of Microsoft Licenses across a
subscription model for Microsoft 365 services.  This includes the Microsoft
Office product lines in the Microsoft Enterprise Agreement (EA), including
Server and Cloud Environment (SCE) and Enrolment for Education Solutions
(EES), Dynamics & Centre of Excellence licenses and Azure consumption. 
b) That best value will be both demonstrable and achieved. 
c) That the performance of contracts awarded are proactively managed against
the council’s agreed approach to contract and supplier management. 
4. Supporting documentation 
Appendix 1 -  Microsoft Aggregation Procurement outcomes & Contract
Benchmarking 
Katrina Hassell
Chief Officer (Business and Digital) 
Page 185 of 218

Page 186

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?     
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts have been discussed and agreed with
Finance? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Based upon the maximum contract value detailed within the report, and
benchmarking completed to date, there is scope for revenue costs to increase by
around £0.600m over the 3-year contract period. Business and Digital expect to
manage these cost increases within their existing contract budgets. 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts have been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts have been discussed and agreed with Legal
and Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
Page 186 of 218

Page 187

5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data?   
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Microsoft Licenses whether modern workplace, digital platform or cloud services are
required to enable council employees to undertake their work. These licenses help
support and enable digital transformation, service redesign and business change
processes. 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☒
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact?
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
Page 187 of 218

Page 188

5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles
from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐  
Page 188 of 218

Page 189

Appendix 1 
Microsoft Aggregation Procurements 
National Further
Competition 
Dates  Winning
Bidder 
No of
participants 
No who
signed best
value
contracts 
NFC157  Feb 2023 for enrolments from
1/4/2023 
Phoenix  11  10 
NFC162  Sep 2023 for enrolments from
1/11/2023 
Phoenix  1  1 
NFC166  Feb 2024 for enrolments from
1/4/2024 
Insight  5  5 
NLC174  May 2024 for enrolments from
1/6/2024 
Ultima  2  1 
CCS Benchmarking 
Annual CCS Benchmark
Pricing 3 Year CCS Benchmark Pricing
Microsoft Enterprise
Agreement (61)  £2,334,825.05   £7,004,475.15 
Server & Cloud (62)  £84,716.66   £254,149.98 
Education Campus
(63)  £520,927.58   £1,562,782.74 
Microsoft Dynamics
(112)  £321,330.59   £963,991.77 
PAC (61c)  £62,041.54   £186,124.62 
Azure Cloud (165a)  £439,000.00   £1,317,000.00 
Total Contract
Budget   £3,762,841.42   £11,288,524.26 
Page 189 of 218

Page 190

Page 190 of 218

Page 191

North Lanarkshire Council
Report
Finance and Resources Committee
Does this report require to be approved? ☒ Yes ☐ No
Ref Date 20/11/24
Local Public Holidays for Factories and Businesses 2025  
From Archie Aitken, Chief Officer (Legal and Democratic)
E-mail hamillm@northlan.gov.uk
swank@northlan.gov.uk Telephone
1. Background
1.1 The Council requires to determine, annually, the dates to be set for local public holidays
for factories and businesses.
1.2 Public or local holidays are determined by local councils and can differ between each
local authority area.
2. Report
2.1 it is proposed that local public holidays for factories and businesses in 2025 be as
follows: -
Wednesday, 1 and Thursday, 2 January 2025
Friday, 18 April 2025
Executive Summary
The purpose of the report is to submit for consideration local public holidays in calendar
year 2025 for factories and businesses in North Lanarkshire. 
Recommendations
It is recommended 
(1) That the Finance and Resources Committee is asked to agree local public holidays in
calendar year 2025 for factories and businesses in North Lanarkshire.
The Plan for North Lanarkshire
Priority Improve economic opportunities and outcomes
Ambition statement (15) Encourage the health and wellbeing of people through a
range of social, cultural, and leisure activities
Programme of Work Statutory / corporate / service requirement
Item 15
Page 191 of 218

Page 192

Monday, 21 April 2025
Monday, 21 July 2025
Monday, 29 September 2025
Thursday, 25 and Friday, 26 December 2025
Scottish bank holiday dates - gov.scot (www.gov.scot)
UK bank holidays - GOV.UK (www.gov.uk) 
3. Measures of success
3.1  Confirmation of local public holidays for factories and businesses in North Lanarkshire.
4. Supporting documentation
N/A
Archie Aitken
Chief Officer (Legal and Democratic)
Page 192 of 218

Page 193

5. Impacts
5.1 Public Sector Equality Duty and Fairer Scotland Duty
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
If Yes, has an assessment been carried out and published on the council’s
website? https://www.northlanarkshire.gov.uk/your-community/equalities/equality-
and-fairer-scotland-duty-impact-assessments
Yes ☐ No ☐
5.2 Financial impact
Does the report contain any financial impacts?
Yes ☐ No ☒
If Yes, have all relevant financial impacts been discussed and agreed with
Finance?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.3 HR policy impact
Does the report contain any HR policy or procedure impacts?
Yes ☐ No ☒
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.4 Legal impact
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)?
Yes ☐ No ☒
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic?
Yes ☐ No ☐
If Yes, please provide a brief summary of the impact?
5.5 Data protection impact
Does the report / project / practice contain or involve the processing of personal
data?  
Yes ☐ No ☒
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject?
Yes ☐ No ☐
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐
5.6 Technology / Digital impact
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
Page 193 of 218

Page 194

Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the
Enterprise Architecture Governance Group (EAGG)?
Yes ☐ No ☐
5.7 Environmental / Carbon impact
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.8 Communications impact
Does the report contain any information that has an impact on the council’s
communications activities?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact?
5.9 Risk impact
Is there a risk impact?
Yes ☐ No ☒
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or
Service or Project Risk Registers), and how they are managed?
5.10 Armed Forces Covenant Duty
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)?
Yes ☐ No ☒
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services.
5.11 Children’s rights and wellbeing impact
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these?
Yes ☐ No ☒
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC).
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out?
Yes ☐ No ☐
Page 194 of 218

Page 195

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☒ Yes ☐ No
Ref: NLC-CPT-24-059 Date: 20 November 2024 
Contract Award for Provision of Domestic Furniture & Furnishings
2024-2027 
From  Elaine Kemp, Chief Officer (Finance) 
E-mail KempE@northlan.gov.uk Telephone: 01698 302408 
Executive Summary 
The Committee is asked to approve the award of a contract for Provision of Domestic Furniture
& Furnishings 2024-2027 (the ‘Agreement’) to CF Services Limited. 
The Agreement is for an initial period of 24 months anticipated to commence on 13 January
2025. The council reserves the right to extend the Agreement for additional periods up to a
maximum of a further 12 months. 
The maximum value of the Agreement is Seventeen Million Two Hundred and Fifty Thousand
Pounds Sterling (£17,250,000) exclusive of VAT.  
Recommendations 
It is recommended that the Finance and Resources Committee: 
(1) Approves the award of the Agreement to CF Services Limited at the maximum value of
Seventeen Million Two Hundred and Fifty Thousand Pounds Sterling (£17,250,000)
exclusive of VAT.  
The Plan for North Lanarkshire 
Priority Improve the health and wellbeing of our communities 
Ambition Statement (12) Ensure our residents are able to achieve, maintain, and
recover their independence through appropriate supports at home
and in their communities 
Programme of Work Resilient People 
Item 16
Page 195 of 218

Page 196

1. Background 
1.1 Under terms of the Housing (Scotland) Act 1987, Housing Management (Housing)
have responsibility for providing temporary housing solutions for service users who
have presented to the authority as homeless while an assessment is made on their
application for housing. In addition, under the terms of the Welfare Funds (Scotland)
Act 2015, the Scottish Welfare Fund in Finance the Council provides essential pieces
of furniture and equipment to support residents in emergency situations to ensure they
can retain tenancies and remain within their communities. 
1.2 As number of applicants applying to the council as homeless are presenting in a crisis
situation. They do not have any household items available for their use at the time of
presentation therefore the council provide furnished temporary accommodation for
their use pending the outcome of their homeless persons application, ensuring they
have access to safe accommodation which aims to minimise the impact / disruption
caused as a result of their homeless situation. Through the Scottish Welfare Fund,
goods are provided following an emergency situation which could include
homelessness but may also includes incidences such as a flood or a fire. 
1.3 The needs of individuals vary and may depend on the priority level SWF applications
are assessed at but goods that may be required include but are not limited to flooring
i.e. carpet and vinyl, white goods, general furniture i.e. wardrobes, chest of drawers,
tables etc. curtains, sofas, bedding, cutlery, crockery etc. 
1.4 Where possible, items that are no longer required that still considered as in good
condition are refurbished and upcycled for reuse however new requirements are still
needed to be purchased on a fairly regular basis. 
1.5 Both Housing and SWF have historically used the Scotland Excel Domestic Furniture
and Furnishings framework agreements with spend of circa £5 million per annum. 
1.6 The requirements of this Agreement will be used by Housing when furnishing the
temporary accommodation which is provided to applicants applying for housing under
terms of the Housing (Scotland) Act 1987. For SWF the goods are provided in
accordance with guidance provided to support the Welfare Funds (Scotland) Act 2015. 
1.7 The requirements of the Agreement will replace existing and historical approaches that
were provided by The Furnishing Service Limited. 
2. Report 
2.1 A group of technical and procurement representatives was formed to develop and
agree the procurement strategy for the Agreement to enable the council to achieve
maximum benefit for the requirements. 
2.2 The initial estimated value of the Agreement dictated that the procurement procedure
be undertaken in accordance with the Procurement (Scotland) Regulations 2016. 
2.3 The procurement procedure was undertaken as a mini competition from the Scotland
Excel framework agreement for Domestic Furniture and Furnishings – Lot 1 (the
“Framework Agreement”). 
2.4 Invitation to Tender documentation was issued to three companies appointed to the
Framework Agreement with the council receiving three tender submissions. 
Page 196 of 218

Page 197

2.5 This recommendation to award the Agreement follows the completion of a procurement
procedure where CF Services Limited has been evaluated as demonstrating Best
Value for the council. 
2.6 Appendix 1 confirms the scoring achieved by each tenderer, further details of the
procurement procedure is provided in Appendix 2 and the SME status and location of
all tenderers is located within Appendix 3. 
Financial / Budget Consideration 
2.7 The pre-tender wholelife estimate budget for the Agreement was Seventeen Million
Two Hundred and Fifty Thousand Pounds Sterling (£17,250,000) exclusive of VAT. 
2.8 Following completion of the procurement procedure, the new rates tendered are, on
average, 14.3% lower than the rates currently in effect under the framework
agreement. 
2.9 The costs associated with delivery of the Agreement will be contained within the H.R.A
and Revenue budget for Housing and the Scottish Welfare Fund. 
Price Stability 
2.10 The prices submitted within the procurement shall remain fixed for 12 months. 
Thereafter they will be subject to an annual price review. 
Community Benefits 
2.11 The council is committed to maximising the delivery of community benefits. The
procurement included a community benefit requirement, this approach is designed to
deliver local community benefits where possible. 
2.12 Within their tender, CF Services Limited committed to deliver the following community
benefits within the Agreement:  
• New job for an individual from a Priority Group
• New job for an apprentice from a Priority Group
• Work Experience for an individual aged 14 to 16 years of age
• Financial support for a Community Project / Organisation
• Non-financial support for a Community Project / Organisation 
2.13 The number of community benefits provided will be in line with expectations set out in
the Framework Agreement and the contract will be managed to ensure that the council
receive the correct amount of community benefits due in line with the spend going
through the Agreement. 
2.14 The community benefits delivered as part of the Agreement includes the creation of
jobs or apprenticeships. 
Fair Work First  
2.15 As part of the tender process for the Framework Agreement, Scotland Excel assessed
areas such as how tenderers will commit to fair work practices and confirmation that
staff in Scotland are paid a minimum of the real living wage or higher. As this was
assessed within the procurement procedure of the Framework Agreement, it could not
Page 197 of 218

Page 198

be reassessed within the mini competition for the Agreement however CF Services
Limited confirmed that that they pay the Real Living Wage to all employees and already
have the associated accreditation. 
Contract Management 
2.16 Officers from Housing Solutions and Scottish Welfare Fund will be responsible for
managing the Agreement which will be undertaken in accordance with the contract and
supplier management conditions applied within the Agreement. 
3. Measures of success 
The Agreement will deliver the following outcomes; 
3.1 Best Value has been considered to be demonstrated by CF Services Limited. 
3.2  The appointment of a supplier who has the experience and capability to provide the
requirements in an efficient form of arrangement. 
3.3 Conclusion of a procurement procedure that is compliant with procurement legislation
and internal procedures. 
3.4 Delivery of a range of Community Benefits which will be contract managed by officers
from both the Scottish Welfare Fund and Housing Solutions. 
4. Supporting documents 
Appendix 1 Summary of Tender Evaluation Process
Appendix 2 Summary of Procurement Process
Appendix 3 SME Status and Location of All Tenderers 
Elaine Kemp
Chief Officer (Finance)  
Page 198 of 218

Page 199

5. Impacts ( http://connect/report-template-guidance ) 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public Sector
Equality Duty and/or Fairer Scotland Duty? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
By providing furnished temporary accommodation we are ensuring service users have
access to safe and secure accommodation which they can utilise pending the offer of
long-term secure accommodation. Many of our service users present to the service with
limited resources and do not have the means to furnish accommodation at the outset of
their presentation. The lack of secure, furnished accommodation will ultimately have a
detrimental impact on the overall wellbeing of the service users which in turn may impact
their ability to integrate fully into society, find employment etc – the provision of furnished
temporary accommodation ensures all services users are given equal support in relation
to their housing needs. 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-fairer-
scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
Previous spend on domestic furniture is as noted below: 
2021/22: - £3,804,832.37 
2022/23: - £4.642,869.47 
2023/24: - £5,043,386.14 
The spend in 2021 was significantly lower that subsequent years as a result of the slower
turnover of temporary accommodation resulting from the periodic restrictions in place as
a result of the Covid pandemic. These restrictions had a direct impact of the number of
homeless presentations received by the service and subsequent requests for temporary
accommodation. However, as restrictions were lifted, presentations and requests for
accommodation increased resulting in a higher turnover of accommodation and therefore
more spend on domestic furniture for these properties. With the increasing difficulties
society faces with the cost-of-living increases etc the service are continuing to experience
further increasing demand on their homeless services and temporary accommodation
and therefore it is anticipated that the levels of spend on domestic furniture for our
temporary accommodation will increase further in the near future. It is anticipated that the
cost of items being purchased will also increase in future frameworks and therefore
securing the call off contract from the existing framework will help to minimise increases
for our service at this time. 
Page 199 of 218

Page 200

5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal data? 
Yes ☒ No ☐ 
If Yes, is the processing of this personal data likely to result in a high risk to the data
subject? 
Yes ☒ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-mailed
to dataprotection@northlan.gov.uk 
Yes ☒ No ☐
5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management, or
connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has an
assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
The implementation of a supplier code of conduct that insists supply chain partners
operate in the most environmentally conscious manner possible. 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Page 200 of 218

Page 201

5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts, highlighting
where the risk(s) are assessed and recorded (e.g. Corporate or Service or Project Risk
Registers), and how they are managed? 
An inability to provide Domestic Furniture could result in our inability to utilise temporary
accommodation and fulfil our requirements in terms of Housing (Scotland) Act 1987. 
5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e. does
it relate to healthcare, housing, or education services for in-Service or ex-Service
personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to ensure
there has been appropriate consideration of the particular needs of the Armed Forces
community to make sure that they do not face disadvantage compared to other citizens in
the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service delivery,
policy, or plan that has an impact on children and young people up to the age of 18, or on
a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has been
made to ensure there has been appropriate consideration of the relevant Articles from the
United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been carried
out? 
Yes ☐ No ☐  
Page 201 of 218

Page 202

Appendix 1 – Summary of Tender Evaluation Process 
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Award      
(Yes / No)
1 CF Services Limited 92.00 Yes
2 The Furniture Service Limited 88.81 No
3 New Two Limited 76.12 No 
Page 202 of 218

Page 203

Appendix 2 – Summary of Procurement Process 
Response
CPT Contract Reference Allocated: NLC-CPT-24-059
Procurement Procedure Utilised: Mini Competition
Governing Legislation / Regulations: Public Contracts (Scotland) Regulations 2015
Date Contract Strategy Approved: 05 September 2024
Framework / DPS Owner: Scotland Excel
Framework / DPS Title: Domestic Furniture and Furnishings
Framework / DPS Reference Number: 2019
Lot Reference / Title: Lot 1 – New Furniture
Companies Appointed to Framework / Lot: 3
Number of Companies Invited to Take Part: 3
Date ITT Published: 06 September 2024
Tender Platform Utilised: PCS-Tender (PCST)
Tender Return Deadline: 27 September 2024
Number of Tenders Received: 3
Tenders from SME’s: 3
Tenders from NLC Based Tenderers:  0
Tenders from Supported Businesses: 0
Number of Non−compliant Tenders: 0
Number of Compliant Tenders: 3
Number of Recommended Tenderers: 1
Basis of Award: Quality: 30% Price: 70%
Evaluation Team: Officers from Housing Solutions
Anticipated Start Date of the Agreement: 13 January 2025
Total Agreement Period (Months): 36 months (24 + 12)
Awarded Value of the Agreement: £17,250,000  
Page 203 of 218

Page 204

Appendix 3 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Location
(Local Authority /
Council Area)
CF Services Limited SME Glasgow
New Two Limited SME Glasgow
The Furnishing Service Limited SME South Lanarkshire 
Page 204 of 218

Page 205

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes ☒ No
Ref: NLC-CPT-23-111 Date: 20 November 2024 
Contract Award for Supply and Delivery of Janitorial Products 
From  Lyall Rennie, Chief Officer (Community Operations) 
E-mail hanlona@northlan.gov.uk Telephone: Anne Hanlon, Facility Support
Services Manager – 07939 280199 
Executive Summary 
This report is to advise Committee of the decision taken in accordance with condition 21.3.2 of the
Council’s General Contract Standing Orders (GCSO’s) where in the absence of committee, the
Depute Chief Executive on 7 August 2024, approved the award of a contract for Supply and Delivery
of Janitorial Products (the ‘Agreement’) to Arrow County Supplies Limited. 
The approval to award the Agreement in accordance with GCSO 21.3.2 was sought due to extension
periods applied within the procurement procedure that resulted in a delayed evaluation process.
Additionally, the previous contract expired on 19 July 2024 and given the importance of requirements
within the Agreement which are required to enable clean and safe properties throughout the council’s
estate, an expedited award process is required to ensure compliance with relevant regulations,
standards etc. 
The Agreement was formally awarded on 28 August 2024 and is for an initial period of 22 months
that commenced on 16 September 2024. The council reserves the right to extend the Agreement for
additional periods up to a maximum of a further 24 months in two 12-month periods. 
The maximum value of the Agreement is FIVE MILLION FIVE HUNDRED THOUSAND POUNDS
STERLING (£5,500,000) exclusive of VAT. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledges the award of the Agreement to Arrow County Supplies Limited.at the maximum
value of FIVE MILLION FIVE HUNDRED THOUSAND POUNDS STERLING (£5,500,000)
exclusive of VAT. 
The Plan for North Lanarkshire 
Priority Improve economic opportunities and outcomes
Ambition Statement All ambition statements
Programme of Work Sustainable Futures 
Item 17
Page 205 of 218

Page 206

1. Background 
1.1 The council has an ongoing requirement to purchase cleaning and janitorial products
including a wide range of products such as rubber gloves, disinfectant, toilet paper, mops,
hand towels, soaps, refuse sacks, washing up liquid etc. 
1.2 The requirements of the Agreement are used at approximately 500 properties within North
Lanarkshire and vital to ensure that all staff can perform their duties effectively and efficiently
whilst ensuring properties are clean and fit for purpose. 
1.3 The requirements within the Agreement are currently under contract with Arrow County
Supplies Limited. This arrangement expired on 19 July 2024 and the Agreement detailed
within this report will supersede it. 
1.4 Based on recent financial data, the council historically spends on average circa £1m annually
for these requirements. Although purchased throughout the council, Facility Support Services
(FSS) are by far the biggest spend area making up circa 48% of the councils total spend. 
1.5 Historically, the council as a collective spends on average £1m of revenue budge per annum
on the requirements. However, costs have increased over the recent past given the well-
publicised rise in inflation and cost of living. Accordingly, the Agreement includes a
provisional contingency sum to cover any increase in cost whilst also providing flexibility in
the event of product changes etc. However, the council offers no guarantee to any or all of
the maximum value / budget applied within the Agreement being spent. 
1.6 Additionally, the Agreement also includes a capital budget of circa £250k for the outright
purchase of unbranded soap, hand towel etc. dispensers. This requirement to purchase
dispensers outright is an option within the Agreement and will be pertinent to the council
identifying appropriate funding. 
1.7 Dispensers are currently provided free on loan by the incumbent supplier however their
replacement (in the event of a supplier change) can lead to significant disruption and charges
as suppliers will not place their own products in other suppliers branded dispensers.
Accordingly, purchasing and installing unbranded dispensers throughout the councils estate
should futureproof ongoing service provision whilst also potentially enabling greater
competition within the next procurement procedure to replace this Agreement. 
2. Report 
2.1 A group of technical and procurement representatives was formed to develop and agree the
procurement strategy for the Agreement to enable the council to achieve maximum benefit
for the requirements. 
2.2 The initial estimated value of the Agreement dictated that the procurement procedure be
undertaken in accordance with the Public Contracts (Scotland) Regulations 2015. 
2.3 The procurement procedure was undertaken as a mini competition from the Scotland Excel
Supply and Delivery of Janitorial Products (1222) framework agreement, Lot 4 – One Stop
Shop (the “Framework”). 
2.4 Invitation to Tender documentation was issued to seven companies appointed to the
Framework with the council receiving seven tender submissions. 
2.5 This recommendation to award the Agreement follows the completion of a procurement
procedure where the tender received Arrow County Supplies Limited has been evaluated as
demonstrating Best Value for the council. 
Page 206 of 218

Page 207

2.6 Appendix 1 confirms the scoring achieved by each tenderer, further details of the
procurement procedure is provided in Appendix 2 and the SME status and location of all
tenderers is located within Appendix 3. 
Financial / Budget Consideration 
2.7 As above, the pre-tender whole life estimate budget for the Agreement was FIVE MILLION
FIVE HUNDRED THOUSAND POUNDS STERLING (£5,500,000) exclusive of VAT. 
2.8 Following conclusion of the procurement procedure, it has been identified that unit rates
tendered by Arrow County Supplies Limited resulted in a circa £19,500 saving per annum
when compared to their existing rates within the Framework. Additionally, Arrow County
Supplies Limited have also committed to a 30% discount against their retail price at time of
order for products not included within the Agreement or the Framework. 
2.9 The costs associated with delivery of the Agreement will be contained within the revenue
budgets for FSS and various other service areas throughout the council including education
establishments, housing operations etc. 
Price Stability 
2.10 Prices within the Agreement are fixed for the initial 12 month period of the Agreement.
Thereafter, prices may be subject to annual review however this review under no
circumstances will introduce price increases greater than the latest / current value (%) as
determined by the National Retail Price Index at time of a request. 
Community Benefits 
2.11 The council is committed to maximising the delivery of community benefits. The procurement
included a community benefit requirement, this approach is designed to deliver local
community benefits where possible. 
2.12 The Community Benefit approach was directed by the Framework and within their tender,
Arrow County Supplies Limited committed to deliver the following community benefits within
the Agreement:  
Community Benefit Annual Delivery Target
Fundraising Provide support to hold three fundraising events to local schools
/ homeless shelters, emergency services etc.
Community
Volunteering
Improve access to local greenspace through four x annual
litterpick events.
Employability
Workshop / Event
Deliver a workshop focussing on CV writing, interview techniques
and Investment and provide a BICS-accredited cleaning course
for council cleaning managers.
Donation of
Materials / Labour
£250 donation of goods to support litter picks, foodbank drives
etc. within the council area
Sponsorship Promote physical activity through sponsoring one local sports
team e.g. financial support / facility investment.
Donation of IT
Equipment
£500 donation to support an individual facing digital exclusion by
donating used IT equipment.
Recruitment One new person employed on Real Living Wage for local delivery
/ installation teams Page 207 of 218

Page 208

2.13 The community benefits delivered as part of the Agreement includes / does not include the
creation of jobs or apprenticeships. 
Fair Work First  
2.14 As part of the tender process for the Framework, Scotland Excel assessed areas such as
how tenderer’s will commit to fair work practices and confirmation that staff in Scotland are
paid a minimum of the real living wage or higher. As this was assessed within the
procurement procedure of the Framework, it could not be reassessed within the mini
competition for the Agreement however Arrow County Supplies Limited confirmed that that
they pay the Real Living Wage to all employees and committed to gaining associated
accreditation. 
Contract Management 
2.15 Officers from FSS, Community Operations will be responsible for managing the Agreement
which will be undertaken in accordance with the contract and supplier management
conditions applied within the Agreement. 
3. Measures of success 
3.1 The Agreement will deliver the following outcomes; 
• Best Value has been considered to be demonstrated given the route to market applied
via the Framework, a circa £19,500 cost saving per annum being envisaged, the receipt
of a 30% discount for products not included within the Agreement or the Framework, and
a more robust contract and supplier management approach being applied within the
Agreement. 
• the appointment of a supplier who has the experience and capability to provide the
requirements in an efficient form of arrangement;  
• conclusion of a procurement procedure that is compliant with procurement legislation and
internal procedures; and, 
• delivery of a range of Community Benefits in the form of a rebate provided direct to the
council to apply accordingly. 
4. Supporting documents 
4.1 Appendix 1: Summary of Tender Evaluation Process
Appendix 2: Summary of Procurement Procedure
Appendix 3: SME Status and Location of All Tenderers 
Lyall Rennie
Chief Officer (Community Operations)  
Page 208 of 218

Page 209

5. Impacts 
5.1 Public Sector Equality Duty and Fairer Scotland Duty 
Does the report contain information that has an impact as a result of the Public
Sector Equality Duty and/or Fairer Scotland Duty? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
If Yes, has an assessment been carried out and published on the council’s website?
https://www.northlanarkshire.gov.uk/your-community/equalities/equality-and-
fairer-scotland-duty-impact-assessments 
Yes ☐ No ☐
5.2 Financial impact 
Does the report contain any financial impacts? 
Yes ☒ No ☐ 
If Yes, have all relevant financial impacts been discussed and agreed with Finance? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.3 HR policy impact 
Does the report contain any HR policy or procedure impacts? 
Yes ☐ No ☒ 
If Yes, have all relevant HR impacts been discussed and agreed with People
Resources? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.4 Legal impact 
Does the report contain any legal impacts (such as general legal matters, statutory
considerations (including employment law considerations), or new legislation)? 
Yes ☐ No ☒ 
If Yes, have all relevant legal impacts been discussed and agreed with Legal and
Democratic? 
Yes ☐ No ☐ 
If Yes, please provide a brief summary of the impact? 
5.5 Data protection impact 
Does the report / project / practice contain or involve the processing of personal
data? 
Yes ☐ No ☒ 
If Yes, is the processing of this personal data likely to result in a high risk to the
data subject? 
Yes ☐ No ☐ 
If Yes, has a Data Protection Impact Assessment (DPIA) been carried out and e-
mailed to dataprotection@northlan.gov.uk 
Yes ☐ No ☐  
Page 209 of 218

Page 210

5.6 Technology / Digital impact 
Does the report contain information that has an impact on either technology, digital
transformation, service redesign / business change processes, data management,
or connectivity / broadband / Wi-Fi? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
Where the impact identifies a requirement for significant technology change, has
an assessment been carried out (or is scheduled to be carried out) by the Enterprise
Architecture Governance Group (EAGG)? 
Yes ☐ No ☐
5.7 Environmental / Carbon impact 
Does the report / project / practice contain information that has an impact on any
environmental or carbon matters? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the impact? 
Scotland Excel included a number of sustainability related method statements in
the procurement of the Framework including the following: 
• Reducing and improving the packaging on products to increase the use of
recyclable or biodegradable packaging; 
• Reducing the use of single use plastics; 
• Sustainable certified products 
5.8 Communications impact 
Does the report contain any information that has an impact on the council’s
communications activities? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact? 
5.9 Risk impact 
Is there a risk impact? 
Yes ☒ No ☐ 
If Yes, please provide a brief summary of the key risks and potential impacts,
highlighting where the risk(s) are assessed and recorded (e.g. Corporate or Service
or Project Risk Registers), and how they are managed? 
All associated risks have been assessed and will be monitored through appropriate
FSS corporate risk register. Ongoing assessment of all risks will also be discussed
as part of the Contract Management arrangements with contractor 
Page 210 of 218

Page 211

5.10 Armed Forces Covenant Duty 
Does the report require to take due regard of the Armed Forces Covenant Duty (i.e.
does it relate to healthcare, housing, or education services for in-Service or ex-
Service personnel, or their families, or widow(er)s)? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the provision which has been made to
ensure there has been appropriate consideration of the particular needs of the
Armed Forces community to make sure that they do not face disadvantage
compared to other citizens in the provision of public services. 
5.11 Children’s rights and wellbeing impact 
Does the report contain any information regarding any council activity, service
delivery, policy, or plan that has an impact on children and young people up to the
age of 18, or on a specific group of these? 
Yes ☐ No ☒ 
If Yes, please provide a brief summary of the impact and the provision that has
been made to ensure there has been appropriate consideration of the relevant
Articles from the United Nations Convention on the Rights of the Child (UNCRC). 
If Yes, has a Children’s Rights and Wellbeing Impact Assessment (CRWIA) been
carried out? 
Yes ☐ No ☐  
Page 211 of 218

Page 212

Appendix 1 – Summary of Tender Evaluation Process 
Final
Rank Tenderer Name Total Tender
Score (%)
Recommended
for Award (Yes
/ No)
1 Arrow County Supplies Limited 86.07% Yes
2 Bunzl UK Limited 85.30% No
3 Unico Limited 85.05% No
4 Alliance Disposables Limited 79.90% No
5 Enviroclean Global Limited 75.07% No
6 GMC Corsehill Limited 67.39% No
7 Instock Limited N / A¹ No 
¹ During the evaluation process, Instock Limited advised the council that they withdrew their tender
therefore it was not evaluated.
Page 212 of 218

Page 213

Appendix 2 – Summary of Procurement Procedure 
Response
CPT Contract Reference Allocated: NLC-CPT-23-111
Procurement Procedure Utilised: Mini Competition
Governing Legislation / Regulations: Public Contracts (Scotland) Regulations 2015
Date Contract Strategy Approved: 16 April 2024
Framework Owner: Scotland Excel
Framework Title: Supply and Delivery of Janitorial Products
Framework Reference Number: 1222
Lot Reference / Title: Lot 4 – One Stop Shop
Companies Appointed to Framework / Lot: Seven (7)
Number of Companies Invited to Take Part: Seven (7)
Date ITT Published: 29 April 2024
Tender Platform Utilised: PCS-Tender (PCST)
Tender Return Deadline: 12 Noon, 04 June 2024
Number of Tenders Received: Seven (7)
Tenders from SME’s: Five (5)
Tenders from NLC Based Tenderers:  None
Tenders from Supported Businesses: None
Number of Non−compliant Tenders: None
Number of Compliant Tenders: Seven (7)
Number of Recommended Tenderers: One (1)
Basis of Award: Quality: 25% Price: 75%
Evaluation Team:
Officers from the Corporate Procurement Team, FSS
(Community Operations and Housing Operations
(Housing Management)
Agreement Award Date 28 August 2024
Anticipated Start Date of the Agreement: 01 September 2024
Total Agreement Period (Months): 46 Months (22 + 12 + 12)
Awarded Maximum Value of the Agreement: £5,500,000  
Page 213 of 218

Page 214

Appendix 3 – SME Status and location of all Tenderers 
Name of Tenderer
Size of Tendering
Organisation
(Micro, Small,
Medium or Large)
Registered
Location
(Local Authority /
Council Area)
Alliance Disposables Limited Large Cheshire
Arrow County Supplies Limited Medium Shropshire
Bunzl UK Limited Large City of Westminster
Enviroclean Global Limited Small Falkirk
GMC Corsehill Limited Small North Ayrshire
Instock Limited Medium Aberdeen City
Unico Limited Medium Falkirk 
Page 214 of 218

Page 215

North Lanarkshire Council
Report
Finance and Resources Committee 
Does this report require to be approved? ☐ Yes   ☒ No
Ref    JMcK/CPT Date 20/11/24 
Contracts awarded below Committee approval threshold 
From  James McKinstry, Chief Officer (Assets and Procurement)  
E-mail McKinstryJ@northlan.gov.uk  Telephone 07939 281 102 
Executive Summary
In accordance with the Council’s General Contract Standing Orders (“GCSOs”), GCSO
21.10 requires a summary report be presented to members with details of contracts
awarded since last committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
Recommendations
It is recommended that the Finance and Resources Committee: 
(1) Acknowledge the contract awards made since last committee reporting cycle.  
The Plan for North Lanarkshire
Priority  All priorities
Ambition statement All ambition statements
Programme of Work Statutory / corporate / service requirement
Item 18
Page 215 of 218

Page 216

1. Background 
1.1 The Local Government (Scotland) Act 1973 section 81 requires local authorities to
“…make standing orders with respect to the making by them or on their behalf of
contracts for the supply of goods or materials or for the execution of works.”. 
1.2 The Council’s General Contract Standing Orders (“GCSOs”) set out the council’s
specific procurement procedures and responsibilities at all spend levels, and include
the reporting requirements of procurement activity, including contracts awards, to
committee for either approval or acknowledgement. 
2. Report 
2.1 In accordance with GCSO 21.10, this report summarises the contract awards since last
committee, specifically for the spend range: 
• over £50,000 but below £500,000 for supplies or services; and,
• over £500,000 but below £2,000,000 for works. 
2.2 If you require further information regards the contract awards reported, please refer to
the lead service area / Chief Officer detailed in the appendix. 
3. Measures of success 
3.1 All requirements contracted contribute to either the council’s programme of work and/or
fulfil a statutory requirement. 
3.2 All contract awards secure best value for the council in accordance with their evaluation
criteria. 
3.3 All necessary diligence has been undertaken in the evaluation and appointment of
contractors. 
3.4 All contract awards are logged in the council’s contract register. 
4. Supporting documentation 
Appendix 1 – Summary of contracts awarded. 
James McKinstry
Chief Officer (Assets and Procurement) 
5. Impacts 
5.1 Impacts considered as part of the contract award procedures are recorded in the
individual contract award reports held by the lead service area.  
Page 216 of 218

Page 217

Appendix 1 – Summary of Contracts Awarded 
Contract Ref NLC-SLP-23-109
Title Supply of Building Cleaning Equipment 
Classification Supplies
Lead Service Area / Chief Officer Lyall Rennie, Chief Officer (Community Operations)      
Competition Governance by Value Higher Threshold Regulated Procurement – The Public Contracts (Scotland) Regulations 2015
Procurement Route Open Procedure
No. of Expressions of interest  22
No. of Bids Received 4
Award Criteria Most Economically Advantageous Tender; Quality 25%, Price 75%
Evaluation Scores – Successful 94.90%
Evaluation Scores – Unsuccessful 94.79% to 81.60%     
Award
Details
Value £475,000.00
Contract Duration 48 months, option to extend a further 12 months
Contractor Name Bunzl UK Ltd T/A Bunzl Cleaning and Hygiene Supplies
Contractor Size Large Company
Contractor Location London
Status - Payment of Living Wage? Yes
Status - Living Wage Accredited? Yes      
Impacts
this section
highlights which
impacts were
considered for
this contract
award procedure
Public Sector Equality
Duty and Fairer Scotland
Duty ☐
HR Policy Impact ☐ Data Protection Impact ☐ Environment / Carbon
Impact ☒
Risk Impact ☒ Children’s Rights and
Wellbeing Impact ☐
Financial Impact ☒ Legal Impact ☐ Technology / Digital
Impact ☐
Communications Impact
☐
Armed Forces Covenant
Duty ☐ 
Further details regarding these impacts can be obtained from the Lead Service Area / Chief Officer       
Page 217 of 218

Page 218

Page 218 of 218